Survey Tenders

Survey Tenders

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+4Others, Building Construction, Consultancy Services, Civil And Architectural Services
United States
Details: Synopsis: introduction: in Accordance With Federal Acquisition Regulation (far) 10.002(b)(2), This Sources Sought Notice Is For Market Research And Information Purposes Only At This Time And Shall Not Be Construed As A Solicitation Or As An Obligation On The Part Of The Department Of Veterans Affairs (va). the Department Of Veterans Affairs, Veterans Health Administration (vha), Program Contracting Activity Central (pcac) Is Conducting A Market Survey And Is Seeking Potential Sources For Project 562-22-700, Construct Ehrm Infrastructure Upgrades At The Erie Va Medical Center (vamc) Located In Erie, Pennsylvania. project Description: the Erie Vamc Is Seeking A General Contractor To Provide All Necessary Tools, Labor, Materials, Equipment, Permits, License, Supervision, And Quality Control For Ehrm Infrastructure Upgrades Erie, Pa At The Erie Va Medical Center, In Accordance With The Drawings And Specifications. Work Includes General Construction, Alterations, Grading, And The Following Infrastructure Improvements: Electrical Power (normal And Emergency); Bonding; Ups; Building Management System (bms) Interfaces; New And Upgrades Of Existing Hvac; Reconfiguration, Expansion, And Renovation Of Existing Spaces; Communication Infrastructure; Physical Security Upgrades; Upgrade Of Fiber Infrastructure Backbone Campus-wide, Within Buildings And Between Buildings; Construct New Data Center; Hazardous Material Abatement And All Necessary Removal Of Existing Structures And Construction Of Certain Other Items. the Upgrade To The Infrastructure Will Include Campus Wide New Campus Wide Fiber Backbone Underground Routing And Will Require Excavation, Trenching, Reinforced Concrete Duct Bank With Associated Access Points. Campus Buildings Impacted By The Upgrades Include Buildings 1, 6, 7, 8, 11, 14, And 18. Upgrades In These Buildings Will Include Existing Rooms And Telecommunications Closets And Include Relocation, Reconfiguration, Expansion, And Renovation Involving New Walls, Doors And Finishes, Etc. Throughout Each Space. construction Shall Comply With Va Infrastructure Standard For Telecommunications Spaces (ists) V4.0, June 1, 2023. New Data Center To Include Electrical Distribution, Cable Management, Data Cabinets, Finishes And Hvac. The Data Center Is Designed For And Meeting The Requirements Of A Small/medium Campus Support Center. The Data Center Shall Be Constructed To Withstand Blast Protection Requirements Per The Va Psrdm. procurement Information: the Proposed Project Will Be A Competitive, Firm-fixed-price Contract Utilizing The Design-bid-build Approach (final Specifications And Drawings Will Be Provided). The Anticipated Solicitation Will Be Issued Either As A Request For Proposal (rfp) In Accordance With Far Part 15, Considering Technical And Price Factors Or As An Invitation For Bid (ifb) In Accordance With Far Part 14, Considering Price Only. The Results And Analysis Of The Market Research Will Finalize The Determination Of The Procurement Method. The Type Of Socio-economic Set-aside, If Any, Will Depend Upon The Responses To This Notice And Any Other Information Gathered During The Market Research Process. this Project Is Planned For Advertising In March, 2025. In Accordance With Vaar 836.204, The Magnitude Of Construction Is Between $20,000,000.00 And $50,000,000.00. The North American Industry Classification System (naics) Code 236220 (size Standard $45.0 Million) Applies To This Procurement. The Duration Of The Project Is Currently Estimated At 540 Calendar Days From The Issuance Of A Notice To Proceed. The Services For This Project Will Include Providing All Construction Related Services Such As: Providing Tools, Labor, Materials, Equipment, Permits, Licenses, Supervision, And Quality Control Required To Complete The Project As Per Contract Documents Prepared By An Independent Architect-engineer Firm. capability Statement: respondents Shall Provide A General Capabilities Statement To Include The Following Information: section 1: Provide Company Name, Duns Number And Unique Entity Identifier (uei), Company Address, Point-of-contact Name, Phone Number And Email. section 2: Provide Company Business Size Based On Naics Code 236220. Also, Provide Business Type (i.e., Large Business, Small Business, Service-disabled Veteran Owned Small Business, Small Disadvantaged Business, Women-owned Small Business, Hub Zone Small Business, Etc.). section 3: Provide A Statement Of Interest In The Project. Please State Your Intent To Submit A Bid On This Project If The Only Evaluation Factor Is Price (far Part 14). Please Also State Your Intent To Submit A Proposal If The Solicitation Contains Both Price And Non-price Evaluation Factor (far 15). section 4: Provide The Prime Contractor S Available Bonding Capacity In The Form Of A Letter Of Intent From Your Bonding Company With This Submission. *please Ensure That The Individual Bonding Capacity Is In Line With The Vaar Magnitude Of Construction Listed Above. Letter Should Include Single Award Limit, Aggregate Limit And Available Bonding Capacity. section 5: Provide The Type Of Work Your Company Has Performed In The Past In Support Of The Same Or Similar Requirement. This Section Is Important As It Will Help To Determine The Type Of Socio-economic Set-aside, If Any. Please Provide The Following In Your Response: no More Than Three (3) Contracts That Your Company Has Performed Within The Last Six (6) Years That Are Of Comparable Size, Complexity, And Scope To This Requirement. Include The Project Name, Project Owner And Contact Information As This Person May Be Contacted For Further Information, Project Scope, Project Size (example: Square Footage), Building Use (example: Medical Facility, Office Building, Etc.), Project Dollar Value, Start And Completion Dates. provide Specific Examples That Relate Aspects Of Previous Projects To The Proposed Project. Describe Specific Technical Skills And Key Personnel Your Company Possess To Perform The Requirements Described Under Description Of Work. describe Your Self-performed** Effort (as Either A Prime Or Subcontractor). Describe Self-performed Work In Terms Of Dollar Value And Description. **self-performed Means Work Performed By The Offeror Themselves, Not Work Performed By Another Company For Them For Any Of The Project Examples Provided. it Is Requested That Interested Contractors Submit A Response (electronic Submission) Of No More Than Eight (8) Single Sided Pages, Single-spaced, 12-point Font Minimum That Addresses The Above Information. This Response Must Be Submitted As A Single Application-generated (not Scanned) Pdf Document That Is Less Than Or Equal To 4mb In Size. Please Note That Hard Copies Will Not Be Accepted. Please Also Include A Cover Page, Which Includes, At A Minimum: The Company S Name, Address, Unique Entity Identifier (if Available), Socio-economic Status, Point-of-contact Name, Phone Number, And E-mail Address. Responses Must Include The Sources Sought Number And Project Title In The Subject Line Of Their E-mail Response. Submissions (responses) Shall Be Submitted Via Email To The Primary And Secondary Points Of Contact Listed Below By January 15, 2025 At 1:00 Pm Et. No Phone Calls Will Be Accepted. the Capabilities Statement Submitted In Response To This Sources Sought Shall Not Be Considered To Be A Bid Or Proposal. This Notice Is For Information And Planning Purposes Only And Is Neither To Be Construed As A Commitment By The Government Nor Will The Government Pay For Information Solicited. No Evaluation Letters And/or Results Will Be Issued To The Respondents. After Completing Its Analyses, The Government Will Determine Whether To Limit Competition Among The Small Business Categories Listed Above Or Proceed With Full And Open Competition As Other Than Small Business. at This Time No Solicitation Exists; Therefore, Please Do Not Request A Copy Of The Solicitation. If A Solicitation Is Released It Will Be Synopsized In Contract Opportunities At Https://sam.gov/. It Is The Potential Offeror's Responsibility To Monitor This Site For The Release Of Any Solicitation Or Synopsis. contracting Office Address: vha Program Contracting Activity Central (vha-pcac) 6100 Oak Tree Blvd. Suite 490 independence, Oh 44131 primary Point Of Contact: leslie Prather contract Specialist leslie.prather@va.gov secondary Point Of Contact: samantha Mihaila contracting Officer samantha.mihaila@va.gov
Closing Date15 Jan 2025
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Healthcare and Medicine
Corrigendum : Closing Date Modified
United States
Details: Admendment36c24925q0143 0002 Is To Extend The Source Sought Deadline To Feb 18th, 21025 At 11:00 Est. admendment36c24925q0143 0001added 52.225-1 And 52.225-2 To Be Filled Out By Interested Parties. on Behalf Of The Tennessee Valley Healthcare Syste, Va Medical Center, Network Contracting Office (nco) 9 Is Issuing This Sources Sought Notice (ssn) As A Means Of Conducting Market Research To Identify Parties Having An Interest In And The Resources To Support This Requirement For A Firm-fixed-priced Purchase Order For Total Hip And Knee Revision Instruments. The Result Of This Market Research Will Contribute To Determining The Method Of Procurement. The Anticipated North American Industry Classification System (naics) Code Is 339112 Surgical And Medical Instrument Manufacturing. This Sources Sought Notice Is For Informational And Planning Purposes Only And Does Not Constitute A Solicitation. There Is No Solicitation At This Time. This Request For Capability Information Does Not Constitute A Request For Bids, Proposals, Or Quotes; Submission Of Any Information In Response To This Market Survey Is Purely Voluntary; And The Government Assumes No Financial Responsibility For Any Costs Incurred. An Award Will Not Be Made On Any Offers Submitted In Response To This Notice, And It Shall Not Be Implied The Government Is Committed To Providing Any Solicitation Or Award Following This Notice. The Government Will Not Pay For Any Information Received In Response To This Request, Nor Will The Government Compensate A Respondent For Any Costs Incurred In Developing The Information Provided. If Your Organization Has The Potential Capacity To Perform These Services, Please Provide The Following Information: Organization Name: Point Of Contract Uei: Business Address: Email And Telephone Number Web Site Address Business Size: Mark If Your Firm Is Eligible For Participation In One Of The Following Small Business Programs. If So, Please Indicate The Program: [ ] Yes [ ] No - Small Business (sb) [ ] Yes [ ] No - Hubzone [ ] Yes [ ] No - Small Business 8(a) [ ] Yes [ ] No - Small Disadvantaged Business (sdb) [ ] Yes [ ] No - Women-owned (wo) Small Business [ ] Yes [ ] No - Service Disabled Veteran Owned Small Business (sdvosb) [ ] Yes [ ] No - Veteran Owned Small Business (vosb) [ ] Yes [ ] No - Large Business [ ] Yes [ ] No - Other (please Specify) Business Type Under Naics 339112, Which Contains A Size Standard Of 1,000 Employees, Commercial And Government Entity (cage) Code And System For Award Management (sam) Unique Entity Id (uei) Number. [ ] Yes [ ] No Are You The Original Equipment Manufacturer (oem) [ ] Yes [ ] No If Not The Oem, Are You An Authorized Distributor, And Can Produce A Letter From The Oem? [ ] Yes [ ] No Is This Product Available On Your Gsa/fss Or Other Gwac Contract If So, What Is Your Contract Number? _____________________ [ ] Yes [ ] No - Comply With 25.225-1 Buy American-supplies Tailored Capability Statements Addressing The Particulars Of This Effort, With Appropriate Documentation Supporting Claims Of Organizational, And Staff Capability. In Addition To Providing The Information Requested Above, Responding Companies Are Encouraged To Include Any Relevant Information (specifications, Cut Sheets, Brochures, Capability Statement, Experience Etc.) To Confirm The Company S Ability To Meet The Requirements Outlined In This Request. Responses To This Ssn Shall Not Exceed 4 Pages And Should Include All The Foremost Mentioned Information. In Addition, All Submissions Should Be Provided Electronically In A Microsoft Word Or Adobe Portable Document Format (pdf). The Government Will Evaluate Market Information To Ascertain Potential Market Capacity To: Provide Services Consistent In Scope And Scale With Those Described In This Notice And Otherwise Anticipated. Implement A Successful Plan That Includes Contractor Compliance With Program Standards, Quality Control, And Performance. Provide Services Under A Firm-fixed-price Contract. Note: Respondent Claiming Sdvosb And Vosb Status Shall Be Registered, And Veteran Small Business Certification (vetcert) Verified In Vetcert Registry Veteran Small Business Certification (sba.gov). Based On The Responses To This Ssn/market Research, This Requirement May Be Set-aside For Sdvosbs, Vosbs, Small Businesses, Procured Through Full And Open Competition, Or Sole Sourced. Submission Instructions: Interested Parties Who Consider Themselves Qualified To Perform The Services Are Invited To Submit A Response To This Ssn By 11:00 Am Est, February 13th, 2025 All Responses Under This Ssn Must Be Emailed To Carmen.hanczyk@va.gov The Subject Line Must Specify 36c24925q0143. Telephone Inquiries Will Not Be Accepted Or Acknowledged, And No Feedback Or Evaluations Will Be Provided To Companies Regarding Their Submissions. Sam: Interested Parties Shall Be Register In The System For Award Management (sam) As Prescribed In Federal Acquisition Regulation Clause 52.232-33. Sam Information Can Be Obtained By Accessing The Internet At Www.sam.gov Or By Calling 1-866-606-8220. Disclaimer And Important Notes. This Notice Does Not Obligate The Government To Award A Contract Or Otherwise Pay For The Information Provided In Response To This Ssn. The Government Reserves The Right To Use Information Provided By Respondents For Any Purpose Deemed Necessary And Legally Appropriate. Any Organization Responding To This Notice Should Ensure That Its Response Is Complete And Sufficiently Detailed To Allow The Government To Determine The Organization S Qualifications To Perform The Work. Respondents Are Advised That The Government Is Under No Obligation To Acknowledge Receipt Of The Information Received Or Provide Feedback To Respondents With Respect To Any Information Submitted. After A Review Of The Responses Received, A Pre-solicitation Synopsis And Solicitation Or Combined Solicitation May Be Published In Contract Opportunities (formerly Federal Business Opportunities Or Fbo). However, Responses To This Notice Shall Not Be Considered Adequate Responses To A Solicitation. Responses To This Notice Are Not Offers And Cannot Be Accepted By The U.s. Government To Form A Binding Contract Or Agreement. This Notice Shall Not Be Construed As A Commitment By The Government To Issue A Solicitation, Or Ultimately Award A Contract, Nor Does It Restrict The Government To A Particular Acquisition Approach. The Government Will In No Way Be Bound To This Information If Any Solicitation Is Issued. Confidentiality. No Proprietary, Classified, Confidential, Or Sensitive Information Should Be Included In Your Response. The Government Reserves The Right To Use Any Non-proprietary Technical Information In Any Resultant Solicitation(s). See Brand Name Or Equal Worksheet ( Salient Characteristics ) On The Following Page. Brand Name Or Equal Worksheet ( Salient Characteristics ) Moreland Type "t" Osteotome White Delrin Handle 7mm, 13" 9mm, 13" Moreland Type Acetabular Punch White Delrin Handle Strike Plate 13" Moreland Type "x" Osteotome White Delrin Handle 7mm X 17" Moreland Type Cement Gouge White Delrin Handle Strike Plate 13" 14mm Cup Moreland Type "v" Osteotome White Delrin Handle 5mm, 13" 7mm X 13" With Strike Plate Moreland Type Cement Rongeur 10 3/4" Cement Fcp/rongeur Long Narrow Moreland Type Cup Extraction Chisel 12 1/2" Cvd 120*, 7mm Cvd 80*, 7mm Moreland Type Femoral/tibial Extractor White Delrin Handle 11mm X 7.75" Moreland Type Intercondylar Femoral Chisel White Delrin Handle 8mm 7 3/4" Moreland Type Thin Osteotome White Delrin Handle Strike Plate 8mm X 7.75" 12.5mm X 7.75" Moreland Type Flat Osteotome White Delrin Handle 10mm X 7.75" 20mm X 7.75" Moreland Type Pointed Osteotome White Delrin Handle Strike Plate 6mm X 7 75" Moreland Type Short V Osteotome White Delrin Handle 5mm X 7.75" 7mm X 7.75" Moreland Type Retrograde Cement Chisel In-line Strike Plate 13" Ss T-handle 5mm Ss T-handle 7mm Ss T-handle 10mm Moreland Sterilization Case All Instruments Require German Grade Stainless Steel. All Handles Are Required To Be Made Of Delrin, A High Heat Resistant, Non-porous Plastic. Wood Is Not Acceptable. All Instruments Must Be Rated Class 1 Devices.
Closing Date18 Feb 2025
Tender AmountRefer Documents 

The village of Vilémov Tender

Electronics Equipment...+1Electrical and Electronics
Czech Republic
Details: The Subject of the Service Is the Preparation of Project Documentation at the Dur/dsp Level in Printed and Electronic Form: Survey of the Current Condition, Study/Design, Project Documentation at the Dur+dsp Level, Engineering Activities, Statement of Measurements/Budget. The Place of Implementation Is the Municipal Office Building in Vilémov on Parcel No. 1 in the Cadastral Register: Vilémov (781894). It Is a Cultural Monument with the Register No. Úskp 4465/5-847 – a Burgher House, Which Is Protected as a Monument.
Closing Date21 Feb 2025
Tender AmountRefer Documents 

FEDERAL AVIATION ADMINISTRATION USA Tender

Others
Corrigendum : Closing Date Modified
United States
Details: Amendment 0005 - The Purpose Of This Amendment Is To Incorporate The Updated Sow Which Includes The Following Statement: Work Must Be Performed By Or Under The Supervision Of A Technician Holding A Current Nicet Certificate Of Level Iii Or Higher In Fire Alarm Systems. Non-certified Personnel May Perform Work Under The Supervision And Signature Certification Of The Primary Nicet Certified Technician Holding The Appropriate Qualification. there Will Be No Changes To The Terms And/or Conditions As A Result Of This Amendment. amendment 0004 - The Purpose Of This Amendment Is To Add The Following Verbiage To Section H: Faa Shall Comply With All Presidential Directives. If Any Clause, Provision, Term, Or Condition In This Sir Or Contract Is Inconsistent With Any Executive Order Or Presidential Memoranda Issued On Or After January 20, 2025, Or Implementing Guidance Thereof, Faa Will Take Action It Deems Appropriate And As Permitted By Law To Correct Any Such Inconsistency To Include Finding A Provision Or Clause Invalid. Applicable Executive Orders Include, But Are Not Limited To: •executive Order 14148 Of January 20, 2025, Initial Recissions Of Harmful Executive Orders And Actions. •executive Order 14151 Of January 20, 2025, Ending Radical And Wasteful Government Dei Programs And Preferencing. •executive Order 14154 Of January 20, 2025, Unleashing American Energy. •executive Order 14168 Of January 20, 2025, Defending Women From Gender Ideology Extremism And Restoring Biological Truth To The Federal Government •executive Order 14173 Of January 21, 2025, Ending Illegal Discrimination And Restoring Merit-based Opportunity. this Amendment Will Also Remove The Following Ams Clauses From The Solicitation: 3.6.2-5 Certification Of Nonsegregated Facilities 3.6.2-6 Previous Contracts And Compliance Reports 3.6.2-8 Affirmative Action Compliance 3.6.2-9 Equal Opportunity 3.6.2-35 Prevention Of Sexual Harassment 3.6.3-8 Alternatives To Products Containing Ozone Depleting Substances And High Global Warming Potential Hydrofluorocarbons 3.6.3-23 Delivery Of Electronic And Paper Documents finally, This Amendment Will Extend The Proposal Due Date To No Later Than 2:00 Pm Ct On Tuesday, February 18, 2025. amendment 0003 - The Purpose Of This Amendment Is To Incorporate The Site Visit Sign-in Sheets And The Questions And Answers Document To This Amendment. The Drawings And Previous Inspection/testing Reports Received From Each Of The Locations Included On This Solicitation Will Be Posted Separately On Sam.gov With This Amendment Due To The Size Of Each Document. There Will Be No Changes To The Terms And/or Conditions As A Result Of This Amendment. amendment 0002 - The Purpose Of This Amendment Is To Correct The Contract Line (clins) Descriptions To Remove The 5-year Services From The Option Years. Pricing Must Be Submitted Utilizing These Updated Clins. Due To The Large Number Of Questions Received, This Amendment Extends The Milestone Dates As Follows: answers Out – 2/4/25 By 2:00 Pm Ct proposals Due – 2/13/25 By 2:00 Pm Ct there Will Be No Other Changes As A Result Of This Amendment. amendment 0001 Is Issued To This Solicitation To Update The Milestone Dates Due To The Executive Order Issued By President Biden Declaring Thursday, January 9, 2025 A National Day Of Mourning For President Carter. The Site Visits At Den And D01 Will Continue As Scheduled But The Site Visit Scheduled For Bjc Will Move To 2:00 Pm Local Time On Thursday, January 16, 2025. This Will Shift The Other Milestone Dates As Follows: site Visits – 1/9/25: 9:00 Am Local Time D01 And Den Atct Immediately Following, 1/16/25: 2:00 Pm Local Time Bjc Atct questions Due – 1/23/25 By 12:00 Noon Ct answers Out – 1/29/25 By 2:00 Pm Ct proposals Due – 2/6/25 By 2:00 Pm Ct there Will Be No Other Changes As A Result Of This Amendment. this Solicitation (sir) Is For Fire Life Safety Maintenance And Testing At The Denver Air Traffic Control Tower (atct) And Base Building (bb) (den), Denver Tracon (d01), And Rocky Mountain Metropolitan Airport Air Traffic Control Tower (atct) And Base Building (bb) (bjc) To Be Completed As Required In The Performance Work Statement (pws) That Is Located As Attachment J-1 Of The Attached Solicitation 697dck-25-r-00096. this Acquisition Is Set Aside For Service Disabled Veteran Owned Small Business (sdvsob). The Principal North American Industry Classification System (naics) Code Applicable To This Effort Is 561621 – Security Systems Services (except Locksmiths). the Resulting Award Will Be Firm-fixed Price Contract. a Site Visit Will Be Held On Thursday, January 9, 2025 At 9:00 Am Local Time Starting At The Denver Tracon (d01) And Then Traveling Over To The Denver Air Traffic Control Tower (den). Another Site Visit Will Be Held Thursday, January 16, 2025 At 2:00 Pm Local Time At The Rocky Mountain Metropolitan Airport Air Traffic Control Tower (bjc). Please Email Me With The Names Of Those Attending And The Name Of The Company They Are Representing No Later Than Tuesday, January 7, 2025 By 4:00 Pm Central Time. Each Company Will Be Limited To Two (2) Total Attendees. The Addresses To Each Of The Locations Are As Follows: denver Tracon (d01), 26705 East 68th Ave, Denver, Co 80249 denver International Atct (den) – C Terminal, 8500 Pena Blvd, Denver, Co 80249 rocky Mountain Metropolitan Atct (bjc), 11001 Control Tower Drive, Westminster, Co 80021 please Document All Your Questions While At The Site Visit And Submit Them To Jennifer J Davis (jennifer.j.davis@faa.gov) Via Email By The Date And Time As Directed Below. Questions Will Not Be Answered During The Site Visit. questions Or Comments Pertaining To This Sir Must Be Submitted In Written Form Via Email To Jennifer J Davis, Contracting Officer, At Jennifer.j.davis@faa.gov No Later Than 12 Noon Central Time On Thursday, January 23, 2025. Questions And Responses That Clarify The Sir May Be Provided To All Offerors; If This Information Is Provided To All Offerors, The Source Of The Questions Will Not Be Identified. Responses To All Questions And Any Necessary Amendments Made To The Sir Will Be Made By 2:00 Pm Central Time On Tuesday, February 4, 2025. all Responses Must Reference The Solicitation Number (697dck-25-r-00096) And Be Submitted To The Following Email Address: Jennifer.j.davis@faa.gov. sa18 Proposal Content submission Of Offer. An Offeror Must Submit An Offer Which Includes All The Following Documents.any Missing Or Insufficient Items Will Result In A “non-responsive” Determination Of The Entire Offer. [ ] Cover Letter Stating That No Exceptions Are Taken To Any Specification Requirements Or Contract Terms And Condition, Or Include A Detailed Summary Of All Exceptions Taken. [ ] Signed Solicitation, Offer, And Award Form (all Amendments Issued). [ ] All Of The Following Sections From The Solicitation Must Be Filled Out And Submitted: section B: Supplies/services & Price/cost Thru Section K: Representations, Certifications, And Other Statements (note: Ensure Offeror Completes Section I, Clause 3.6.3-3 Hazardous Material Identification And Material Safety Data). the Faa Does Not Follow The Far Therefore A Submission Of A Sam.gov Far Clause Report Does Not Meet This Requirement.all Ams Clauses In This Solicitation Must Be Completed. [ ] A Technical Proposal Demonstrating How All The Required Services In The Statement Of Work Will Be Completed And A Demonstration Of Key Personnel As Required That Will Manage This Contract. [ ] A Certificate Of Liability From Your Insurance Company That Shows You Can Meet The Requirements Identified In In Section I, Ams Clause 3.4.1-10 Insurance - Work On A Government Installation (oct 2020). [ ] No Less Than Three (3) Past Performance References Of Similar Work (e.g. Must Be The Same Type Of Services Of A Similar Size And Scope) To The Requirements In This Sir. [ ] No Less Than Three (3) Fully Completed Customer Satisfaction Surveys (css) Must Be Submitted By A Third Party Prior To The Proposal Due Date To Meet The Customer Experience Factor.the Css Attached In Section J, Attachment Number J-2 Is Required To Be Used For The Customer Experience Submittals. sa56 Evaluation Factors For Award - Services the Government Will Make Award To The Contractor Offering The Lowest Priced, Technically Acceptable Offer. The Government Will Make Award To The Responsible Offeror Whose Proposal Conforms To The Solicitation Terms And Conditions. in Accordance With Ams Policy Section 3.2.2.3.1.2.2, Communications With Offerors, The Purpose Of Communications Is To Ensure Mutual Understanding Between The Faa And Offerors About All Aspects Of The Procurement, Including The Offerors' Submittals/proposals. Communications With Offerors May Take Place Throughout The Source Selection Process, Through Contract Award, And Following Award As Necessary.offeror Responses To Communication Items May Be Considered In The Evaluation Of An Offeror’s Proposal.where Communications Do Not Result In Any Changes In The Government’s Requirements Or Sir, The Government Is Not Required To Request Or Accept Offeror Revisions. the Government May Hold One-on-one Meetings With Individual Offerors As It Pertains To Their Offers. One-on-one Communications May Continue Throughout The Process At The Government’s Discretion. Communications With One Offeror Do Not Necessitate Communications With All Other Offerors. All Communications Between The Government And Offerors Must Be Through The Co Or Individuals Designated By The Co In Writing. Offerors Must Submit Written Communications To The Co.the Faa Also Reserves The Right To Award A Contract Immediately Following The Conclusion Of Evaluations And Is Not Required To Conduct Discussions Or Negotiations With The Successful Offeror Or Any Other Offeror. proposals Shall Be Evaluated As Either 'acceptable' Or Unacceptable’ On The Basis Of The Following Criteria: a. Past Performance provide A List Of No Less Than Three (3) Successful Contracts That Provided Services Of Similar Scope And Complexity As Described In The Statement Of Work In This Solicitation Within The Past Five (5) Years. Be Specific And Provide Details. For Each Project Address The Following Points: a) Project Title, Description, And Contract Number b) Client Names, Phone Numbers, And Contact Person c) Dollar Value d) Scope Of Work In Detail e) Percentages Of Work Subcontracted And Nature Of That Work f) Award And Completion Dates g) Any Contractual Issues Or Technical Matters Disputed, And Resolution Thereof h) Any Claims And Resolution Thereof (i.e., Nature, Number Dollar Value) i) Any Relevant Information That Would Reflect On The Offeror’s Ability To Meet Schedule Constraints standard For Review: An Acceptable Proposal Must Demonstrate At Least Three (3) Successful Relevant Projects In The Past Five (5) Years Similar To The Current Requirement.if Any Of The Information Required Is Not Included, The Offeror Will Be Considered Non-responsive And Evaluated As Unacceptable.if The Contractor Does Not Have An Applicable Performance History, Then Within The Cover Letter The Contractor Must Indicate The Reason For Such Absence Of Past Performance History And Provide A Proposed Project Management Plan To Ensure The Quality Of The Services To Be Performed. Failure To Demonstrate The Minimally Acceptable Standards Under This Factor Will Result In An "unacceptable" Rating And Possible Elimination From Further Consideration For Contract Award.the Faa Reserves The Right To Contact The Customers Listed As References, And To Apply That Information In Its Final Determination. b. Customer Experience an Offeror Is Required To Have At Least Three (3) Customer Satisfaction Surveys (css) From Third Party References Completed And Submitted Directly To Jennifer J Davis At Jennifer.j.davis@faa.gov. The Css Is Attached To The Solicitation Announcement As Attachment J-2 And Is Required To Be Used For The Customer Experience Submittals. standard For Review: At Least Three (3) Css Must Be Received From Third Party References Before The Solicitation Deadline With An Average Rating Of Good Or Higher. The Faa Reserves The Right To Contact Customers Listed As References And Conduct A Css In The Event There Is Insufficient Competition Due To The Lack Of Surveys Received. Any Negative Customer Review May Deem The Proposal Unacceptable And Will Be Rejected From Further Consideration.keep In Mind That The Faa May Use Information Other Than That Provided By The Contractor In Connection With This Solicitation And Apply That Information In Its Final Determination. consideration Of Price: The Offeror Must Submit Pricing Information As Prescribed In Part I – Section B Of The Request For Offers. The Government Will Make Award Based On Successful Negotiation Of Price And Conformance With Solicitation Terms And Conditions To The Lowest Priced, Technically Acceptable Offer. Pricing Is Required For The Base And Each Option Year For Each Service. If Full Pricing Is Not Received, The Proposal Will Be Deemed Unacceptable. the Faa Will Evaluate Proposals For Reasonableness In Accordance With Ams Policy Section 3.2.3.2 And Ams Procurement Guidance Section T3.2.3. A Price Is Reasonable If, In Its Nature And Amount, It Does Not Exceed That Which Would Be Incurred By A Prudent Person In The Conduct Of Competitive Business. When Determining Price Reasonableness, The Government Reserves The Right To Compare The Offeror’s Proposed Prices To The Independent Government Cost Estimate (igce), To Published Catalog Or Market Prices, To Prior Prices Paid For The Same Or Similar Items And Services, Or As Compared To Any Other Sources. The Faa Reserves The Right To Perform Price Realism And/or Cost Realism In Accordance With Ams T.3.2.3(a)(1). The Faa Reserves The Right To Conduct Cost Analysis If Necessary To Ensure A Fair And Reasonable Price And To Support The Price Realism And/or Cost Realism Analysis. The Faa, At Its Sole Discretion, May Require Additional Information To Conduct Cost And Price Analysis Or Reject Proposals Lacking Completeness Or Consistency. (end Of Provision) contractors Must Be Registered With The System For Award Management, Www.sam.gov On The Date Established For Receipt Of Offers (february 18, 2025). Reference Ams Clause 3.3.1-33, Paragraph (d), “if The Offeror Does Not Become Registered In The Sam Database In The Time Prescribed By The Contracting Officer, The Contracting Officer May Proceed To Award To The Next Otherwise Successful Registered Offeror.” during The Solicitation, All Communications Will Be Conducted Only With Jennifer J Davis, Contract Specialist, Via Email (jennifer.j.davis@faa.gov). No Phone Calls Will Be Accepted. milestones sir Out – 12/12/24 site Visit Attendee List Due – 1/7/25 By 4:00 Pm Ct site Visits – 1/9/25: 9:00 Am Local Time D01 And Den Atct Immediately Following, 1/16/25: 2:00 Pm Local Time Bjc Atct questions Due – 1/23/25 By 12:00 Noon Ct answers Out – 2/4/25 By 2:00 Pm Ct proposals Due – 2/18/25 By 2:00 Pm Ct all Submissions Must Be Received No Later Than 2:00 Pm Central Time On Tuesday, February 18, 2025. Offerors Assume Full Responsibility Of Ensuring That Proposals Are Received At The Place And By The Date And Time Specified Above. Late Submittal Of Proposals Will Not Be Accepted. the Government Will Not Be Liable For Costs Associated With The Preparation And Submittal Of Inquiries Or Responses To This Announcement And Will Not Reimburse Any Firm For Costs Incurred In Responding To This Sir. Responses Will Not Be Returned.
Closing Date18 Feb 2025
Tender AmountRefer Documents 

City Of Silver Tender

Others
Czech Republic
Details: The Subject of the Public Contract is the Completion of the Restoration of the Interior of the Church of St. Peter in Stříbro (in the Previous Stage in 2023, Work Was Completed on the Ceiling and Porch), Now the Restoration of the Plaster with Murals, Stone Elements and Brick Floors Will Begin. The Church Is Located at Plot No. St. 227/1 in the Land Registry Office of Stříbro, Which Is an Immovable Cultural Monument Registered in the Registry Office of the Czech Republic Under the Register Number 37746/4-1928. The Subject of the Public Contract Is Precisely Specified in the Contract for the Work (Annex No. 1 to the Tender Documentation), the Restoration Survey and the Plan for the Restoration of the Stone Elements, Porch, Ceiling and Floor in the Interior of the Church of St. Petra Ve Stříbře, Restoration Survey And Plan For The Restoration Of The Mural Paintings And Plaster In The Interior Of The Church Of St. Peter In Stříbře, Binding Opinion Issued By The City Of Stříbro, Department Of Construction And Spatial Planning On 07.07.2021 And List Of Works, All Prepared By Terrigena Art Sro Company No. 29105293 (Annex No. 2 To The Tender Documentation).
Closing Date4 Feb 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Civil And Construction...+2Consultancy Services, Civil And Architectural Services
United States
Details: It Is Anticipated That A Formal Solicitation Will Be Issued Within 30 Days Of This Pre-solicitation Notice. No Response Is Required For This Notice. pre Solicitation Notice For N66604-23-rfpreq-npt-10-0243 Indefinite Delivery/indefinite Quantity (idiq) Contract For Multi‐ Discipline Architect‐engineer (a‐e) Services In Support Of Projects On Nuwc Facilities At Naval Undersea Warfare Center Newport Division (nuwcdivnpt), Newport, Ri. description: All Information Needed For Interested Parties To Submit A Standard Form Sf 330, Architect Engineer Qualifications Is Contained Herein. There Is No Separate Request For Proposals (rfp) Package To Download. background: the Naval Undersea Warfare Center Newport Division (nuwcdivnpt) Requires A-e Services In Support Of Various Projects At Nuwcdivnpt. This Procurement Will Result In One Single-award Idiq Contract For Multi‐discipline A‐e Services For Planning, Design, Construction, Evaluation Of New Construction, And Renovation Projects. These Services Will Be Procured In Accordance With 40 United States Code (usc) Chapter 11, Selection Of Architects And Engineers, As Implemented By Federal Acquisition Regulation (far) Subpart 36.6. The Idiq Contract Will Be For A Five-year Ordering Period. The Maximum Value For The Contract Term, Including All Awards, Shall Not Exceed $5,000,000. The Guaranteed Minimum For The Contract Ordering Period Is $500 And Will Be Satisfied By Simultaneous Award Of The Initial Task Order With The Basic Contract. Firm‐fixed Price Task Orders Will Be Negotiated At The Task Order Level. In Accordance With Far 15.404-4(c)(4)(i)(b), The Contract Price Or The Estimated Cost And Fee For Production And Delivery Of Designs, Plans, Drawings, And Specifications Shall Not Exceed 6 Percent Of The Estimated Of Construction Of The Public Work Or Construction, Excluding Fees. There Will Be No Minimum Dollar Limits Per Task Order. The Maximum Dollar Limit Per Task Order Is $3,000,000. this Proposed Contract Is Being Solicited As A Small Business Set-aside. The North American Industry Classification System (naics) Code Is 541330, Engineering Services, And The Small Business Size Standard Is $25,500,000. The Government Seeks The Most Highly Qualified Firm To Perform The Required Services, Based On The Demonstrated Competence And Qualifications, In Accordance With The Selection Criteria Included Herein. comprehensive A‐e Services Are Required For The New Construction, Repair, Replacement, Demolition, Alteration, And/or Improvement Of Facility Projects. Projects May Include Single Or Multiple Disciplines, Such As: Structural, Civil, Mechanical, Electrical, Architectural, Planning, Environmental, Fire Protection, Cost Estimating, And/or Geotechnical. The Types Of Projects May Include: Building Renovations; Building Additions; Site Work Required To Support New Work; New Construction; Parking Areas; Foundations; Retaining Walls; Failure Investigation Including Destructive And Non‐destructive Testing; Seismic Evaluation And Design; Progressive Collapse Analysis; Blast Resistant Design; Structural Engineering Investigations; Utility Systems Including Sanitary And Storm; Mechanical Services; Electrical Services; Water Systems; Storm Water Management; Surveying; Pavement Design; And Civil Engineering Studies. performance Location(s): newport, Ri requirements: for Complete Details On This Requirement See Attachment 1, “saes.” Specific Types Of A‐e Services That May Be Required Under This Contract Include: facility Planning And Project Development: Services May Include Work Such As The Following: Prepare Master Plans, Project/site Plans For Proposed Facility/infrastructure Projects. Facility Planning May Be Requested For Renovation, Addition, Repair And New Construction Projects. development Of Design‐bid‐ Build (dbb) Packages: Services May Include Preparation Of Drawings And Specifications For Renovation, Addition, Repair Or New Construction Projects. Design Meetings With The Government May Be Required In Order To Agree On Design Solution(s) That Meet The Government’s Project Requirements. development Of Design‐build (db) Request For Proposal (rfp) Packages: Services May Include Working With A Construction Manager As Part Of A Design-build Team To Prepare Drawings And Specifications For Renovation, Additions, Repair Or New Construction Projects. Design Meetings With The Government May Be Required In Order To Agree On Design-build Solution(s) That Meet The Government’s Project Requirements. preparation Of Cost Estimates Using Unit Guidance And Parametric Cost Estimating: Services May Include Preparing Cost Estimates For Renovation, Addition, Repair And/or New Construction Projects Based On Prepared Design Documents. development Of Alternatives And Economic Analysis: Service May Include Providing Alternate Design Solutions And Associated Economic Impacts For Renovation, Addition, Repair Or New Construction Projects. condition Assessment: Services May Include Performing Studies Of Existing Buildings And/or Components Of Buildings To Validate Existing Conditions That May Then Be Used To Inform Future Proposed Design Solutions. Site Visits May Be Required To Document Existing Facility/infrastructure Conditions. field Investigations (including Utility And Geotechnical): Services May Include Conducting Field Surveys/investigations Of Existing Sites, Buildings Or Specific Components Of A Building (i.e Hvac Or Electrical Systems) In Order To Document Current Status Of A Facility’s Infrastructure. The Results Of Any Field Investigations May Then Be Used To Assist With The Preparation Of Design Documents For A Particular Project. surveying And Mapping: Services May Include Surveying And/or Mapping Of Existing Or Proposed Sites For A New Construction Project Or Building Addition. Survey Work May Be Required In Order To Document Existing Site Conditions To Support Site/civil Design Solutions. preparation Of Engineering Evaluations: Services May Include Performing Engineering Calculations To Support Civil, Mechanical, Electrical, Plumbing Or Fire Protection Design Solutions. incorporation Of Sustainable Engineering Design Practices: Services May Include Incorporation Of Design Principles For Renovation, Addition, Repair And/or New Construction Projects To Support Sustainable Design Solutions. consultations: Services May Include Collaborating With Other Specialty Design Professionals To Offer And Propose Design Solutions Required To Respond To Unique Project Requirements. energy Computations; Services May Include Preparation Of Energy Calculations To Verify Proposed Design Solutions Comply With Required Building Codes, Federal, State And/or Local Energy Requirements. soil Borings: Services May Include Conducting Soil Boring Testing In Order To Identify Minimum Design Requirements For New Construction Projects Or Building Additions. obtaining Permits And Regulatory Approvals: Services May Include Submitting Design Documents To Local, State And/or Federal Jurisdictions For Review And Approval Prior To Proceeding With Renovation/construction Work. environmental Investigation And Consultation: Services May Include Providing Design Services Required To Meet Environmental/epa Regulations On Facility/infrastructure Projects And Providing Consultation(s)/collaboration With The Government To Discuss Acceptable Environmental Design Alternatives And Solutions. review Of Contractor Submittals: Services May Include Review Of Project Submittals (such As Product Data Or Product Samples) In Order To Validate Proposed Materials/products Comply With Design Drawings And/or Specifications. field Consultation And Inspection During Construction: Services May Include Responding To Contractor Rfi’s During Construction In Order To Address Design Questions That May Arise During Construction/renovation Projects. commissioning: Services May Include Supporting The Commissioning Process By Attending Commissioning Meetings In Order To Validate Engineered Design Solutions Are Incorporated Into The Project In Accordance With Design Specifications. operation And Maintenance Support Information (omsi): Services May Include Providing The Government With O&m Documentation And Training, Where Applicable, Based On The Final Design Solution And Construction. as‐built Drawing Preparation: Services May Include Updating Design Documents Including Drawings And Specifications To Accurately Reflect Construction Field Changes And Document Final As-built Construction/renovation Projects. functional Analysis Concept Development (facd)/design Charrette/other Design And Construction Related Workshops And Meetings: Services May Require Attendance At Design Meetings To Collaborate With Government Representatives To Consider Design Options And Build Consensus Regarding Preferred Design Solution(s). document Deliverable Requirements: cdrl Number title sub-title cdrl A001 contractor’s Personnel Roster contractor Personnel cdrl A002 hazardous Materials Management Program (hmmp) Plan facility Operations Inventory Hmmp Plan cdrl A003 monthly Status Report monthly Status Report cdrl A004 product Drawings/models And Associated Lists drawing Package cdrl A005 manhour Estimate, Technical Cost Proposal estimates And Proposal cdrl A001 – Contractor’s Personnel Roster within Ten Business Days Of Task Order Issue, The Contractor Shall Submit A List Of All Employees Working On The Project To The Contracting Officer. This List Shall Include Each Employee's Name, And Work Assignment. Changes To The Personnel List Shall Be Submitted At Least Ten Business Days In Advance. In Emergency Situations And Cases Of Adverse Actions Where Ten Business Days’ Notice Is Not Possible, The Contractor Shall Submit The Required Information Regarding The Change In Writing To The Contracting Officer Representative (cor) Not Later Than 24 Hours After The Replacement Employee Is On Board. cdrl A002 – Hazardous Materials Management Program (hmmp) Plan the Contractor Shall Submit A Hazardous Material Management Plan (hmmp) As Addressed In Paragraph 3.2 Of The Saes. cdrl A003 – Monthly Status Report contractor Shall Provide A Monthly Status Report For Each Project In Which The Support Was Provided. The Report Shall Discuss Major Impacts, Issues, And Steps For Remediation Of Issues, Proposals To Improve Operational Efficiencies, Effectiveness, Quality, Or The Customer Experience. cdrl A004 – Product Drawings/models And Associated Lists the Contractor Shall Develop And Deliver Drawings, Specifications, Architect / Engineering Reports, To The Technical Point Of Contact Upon Request. cdrl A005 – Manhour Estimate, Technical Cost Proposal Insert Title a‐e Firms Shall Prepare Cost Estimates Utilizing The Micro‐computer Aided Cost Estimating System (mcaces) Mii Estimating System. Specifications Shall Be Prepared In The Specifications‐kept‐intact (specsintact) Program. Design‐build Rfps Shall Be Prepared Utilizing Design‐build Masters, And Drawings Shall Be Prepared In Autocad (2016 Or Higher) Utilizing The National Computer‐aided Design And Drafting (cadd) Standards Format. Three‐dimension (3‐d) And Bim Modeling May Also Be Required. The Contractor Shall Provide Documents In Pdf Format. Final Documents Shall Be Electronically Signed By The Assigned Architect Or Engineer. All Projects Shall Be Designed In The Modern International Standard Version Of The Metric International System Of Units (si), Unless Specifically Exempted By The Statement Of Work At The Task Order Level. other Special Considerations: as Defined By Paragraph 1‐5 Of United Facilities Criteria (ufc) 3‐ 600‐01, Fire Protection Engineering For Facilities, This Contract Requires The Services Of A Licensed Fire Protection Engineer Or Consultant. asbestos And/or Lead‐based Paint Assessments May Be Required On This Contract To Determine The Presence Of Hazardous Material During Removals/demolition Or At Utility Points Of Connections. Work On And Around Waterfront Structures, Including Under Deck And Underwater, And Work In Confined Spaces May Be Required On This Contract. A‐e Firms Must Be Able To Accept Work That Involves Asbestos, Lead Paint, Poly‐chlorinated Biphenyls (pcb)s, And Other Hazardous Materials, Work On And Under Waterfront Structures, And In Confined Spaces. all Engineering And Design Services Shall Comply With The Most Current Edition Of Facilities Criteria (fc) 1‐300‐09n Design Procedures, And Other Requirements As Indicated On The Whole Building Design Guide (wbdg) Web Site (www.wbdg.org). The Selected A-e Contractor Shall Have Online Access To Web‐based Support Programs Capable Of Creating Auto-cad Documents For Government Review, And Email Via The Internet For Routine Exchange Of Correspondence. The Selected A-e Contractor Shall Submit And Maintain An A‐e Accident Prevention Plan (app) In Accordance With U.s.army Corp Of Engineers (usace) Em 385‐1‐1 For Each Project On This Contract And Activity Hazard Analysis (aha) For Each In‐field Action. Key Personnel, Including Consultants, Must Be U.s. Citizens. a‐e Firms Are Advised That The Selected Firm, Its Subsidiaries Or Affiliates, And Its Consultants Which Design, Prepare, Or Provide Engineering Services In Support Of Construction Contract Documents Cannot Provide Construction Services For The Same Contract. This Includes Concept Design, Preparation Of Project Programming Documents (dd Form 1391), Facility Siting Studies, Environmental Assessments, Geotechnical Services, Engineering Studies And Services, Design‐build Request For Proposals (rfps), Or Other Activities That Result In Identification Of Project Scope And Cost. The Awarded Contract Will Be Subject To Specific Provisions Addressing The Avoidance Of Organizational Conflicts Of Interest, Including Naval Facilities Acquisition Supplement (nfas) 5252.209‐9300, Organizational Conflicts Of Interest. The Prime Firm For This Contract Will Be Required To Perform Throughout The Contract Term. submission Requirements: a‐e Firms Desiring To Be Considered For This Contract Shall Submit A Completed Sf 330 Package By Email To The Contracting Officer And The Contract Specialist. The Sf 330 Shall Be Typed, At Least 11 Point Times New Roman Or Larger. Part I Shall Not Exceed 100 Single‐sided 8.5 By 11 Inch Pages (the Page Limit Does Not Include Individual Subcontracting Reports (isr)s, Certificates Licenses, Nor Does The Page Limit Include Cover Sheets Or Dividers, Provided That These Do Not Contain Any Substantive Information Submitted In Response To The Synopsis Or Intended To Demonstrate The Qualifications Of The Firm). Part I Pages Shall Be Numbered Sequentially. Introductions Shall Be Included In Sections E And F. A-e Firm Submissions Shall Include Its Dun & Bradstreet (duns), Commercial And Government Entity (cage), And Taxpayer Identification Number (tin) Numbers In Block 30 Of The Sf 330. all Contractors Are Advised That Registration In System For Award Management (sam) Database Is Required Prior To Award Of A Contract. Failure To Register In The Sam Database May Render Your Firm Ineligible For Award. For More Information, Check The Sam Web Site: Https://www.sam.gov. in Accordance With The Federal Acquisition Regulations (far) 36.601‐4(b), The A‐e Firm Must Be A Registered And Licensed Architectural And/or Engineering Firm In Rhode Island To Be Eligible For Award. A-e Firms Shall Provide Proof That The Firm Is Permitted By Law To Practice The Professions Of Architecture Or Engineering, (e.g., State Registration Number, Or A Brief Explanation Of The Firm’s Licensing In Jurisdictions That Do Not Register Firms, Etc.). Failure To Submit The Required Proof Will Result In A Firm’s Elimination From Consideration. firms Who Are Offering As A Joint Venture Should Include With Their Submission A Copy Of The Joint Venture Agreement. Failure To Include The Joint Venture Agreement Will Result In The Firm’s Elimination From Further Evaluation. if An Sf 254/sf 255 Is Submitted For This Solicitation, It Will Not Be Reviewed Or Considered. As Required Above, Provide Verifiable Evidence That Your Firm Is Permitted By Law To Practice The Professions Of Architecture Or Engineering (e.g., State Registration Number). interested Firms Shall Submit Proposals To Both The Contract Specialist And The Contracting Officer At The Email Addresses Listed Below. sf 330 Submissions Are Due No Later Than Xx Xxxxx 2023 At Xx:xx Pm (est). Late Responses Will Be Handled In Accordance With Federal Acquisition Regulations (far) 52.215‐1. The Points Of Contact For This Acquisition Are Contract Specialist, Xxxxx Xxxxxx, At Xxxxxxxxx@navy.mil And Xxxxx Xxxxxxx, Contracting Officer, At Xxxxxxx@navy.mil. (to Be Provided Within Formal Solicitation) the Total Maximum File Size For Email Proposal Submission Is Limited To 10mb. If The Submission Will Exceed 10mb, It Is Acceptable For The Submission To Be Broken Up Into Multiple Emails Or The Firm Should Coordinate With The Identified Government Poc's To Obtain A Dod Safe Request For Submission. Failure Of The Firm To Coordinate A Dod Safe Request For Submission In A Timely Manner, To Allow Sufficient Time For Submission Of The Required Documents Before The Required Response Date, Will Not Be Acceptable Justification For The Government Allowing Or Considering A Late Submission. A Timely Manner Is Defined As Requesting Such Dod Safe Information From The Identified Government Poc's No Later Than 10 Calendar Days In Advance Of The Response Date Of The Synopsis. if The Firm Chooses To Complete Multiple Email Submissions, Emails Shall Clearly Indicate The Number Of Email Submissions The Government Should Expect To Receive And Shall Be Numbered To Indicate Which Email Of The Submission Each Email Received Is (i.e.: Email 1 Of 3; Email 2 Of 3; Email 3 Of 3). inquiries Concerning This Procurement Should Reference The Solicitation Number And Title And Be Forwarded Via Email To The Points Of Contact Identified Above. Questions Pertaining To This Requirement Are Due No Later Than Fourteen (14) Days After Posting Of This Requirement On Sam.gov. list Of Attachments: scope Of Architect-engineer (a-e) Services (saes) (draft) cdrls (draft) selection Criteria: firms Responding To This Synopsis Will Be Evaluated To Determine The Most Highly Qualified Firms To Perform The Required Services In Accordance With The Published Selection Criteria. failure To Comply With Instructions, Or Provide Complete Information May Affect The Firm’s Evaluation Or Disqualify The Firm From Further Consideration. Evaluation Criteria (1) Through (4) Are Considered Most Important And Are Equal Among Themselves; Criteria (5) Through (6) Are Less Important And Are Equal Among Themselves; Criteria (7) Will Only Be Used As A Tie‐breaker Among Technically Equal Firms. Specific Selection Criteria Include: specialized Experience professional Qualifications And Technical Competence past Performance quality Control program Management And Capacity firm Location volume Of Work criterion 1 —specialized Experience (sf 330, Part I, Section F): firms Will Be Evaluated On Specialized Experience In Performance Of Services Similar To Those Anticipated Under This Contract Through Evaluation Of Experience In: infrastructure/facility Design Utilizing The Following Criteria, Including, But Not Limited To, Unified Facilities Criteria (ufc’s) And Military Standard (milstd); conducting On‐site Design Development Workshops, Charrettes, Functional Analysis, Schematic Design, Or Space Programming, Including Supporting Budgetary Or Parametric Cost Estimating; demonstrated Ability To Design To Project Budget And Schedule; experience Preparing Design‐bid‐build; experience Preparing Design‐build Rfp Packages; And designing Projects In Accordance With Dod, Navy, Or Other Government Agencies’, Or Private Industry Criteria. firms May Be Considered More Favorably Under Criterion 1 By Demonstrating The Following: experience In The Delivery Of Multiple Types Of A‐e Services Identified In The Requirements Above. experience On Multiple Facility Types, Such As Business, Educational, Industrial, Assembly, Health Care, Residential, Storage, Laboratory, And Mixed-use Occupancies, Identified In The Requirements Above. demonstrated Experience Using The Micro Computer Aided Cost Estimating System Second Generation (mii) Cost Estimating Software. demonstrated Experience On Navy Bases Within The Primary Geographic Area Of The Contract. demonstrated Experience Designing Modifications To Existing Structures And Developing Construction Phasing While Associated Facilities Are Required To Remain In Service. demonstrated Experience Specific To Navy Facility Projects, Illustrating The Capability Of The A‐e Firm And Individual Design Team Members (a‐e Staff, Key Personnel, Consultants) To Work Within The Navy Project Planning Process Including: dd Form 1391 Development In The Navy’s Electronic Procurement Generator (epg), dd Form 1391 Validation Procedures Including Cost Validation. demonstrated Understanding Of Procedures And Timely Submission Of Base Access Documents In Adherence With Security, Safety, Environmental, And Accident Prevention Regulations In Order To Support A‐e Activities And Maintain Project Schedules. experience Of A‐e Firm And Individual Design Team Members (a‐e Staff, Key Personnel, Sub‐ Consultants) With Facilities Located In Historic Areas That Will Require Consultation With State Historic Preservation Officer (shpo) Throughout The Design Process. criterion 1 Submission Requirements: provide Up To A Maximum Of Ten (10) Projects Completed (project Completion To Be Defined As Receiving Final Design Acceptance From Client) Within The Past Seven (7) Years Immediately Preceding The Date Of Issuance Of This Notice That Best Demonstrate Specialized Experience Of The Proposed Team In The Areas Outlined Above. Sufficient Information To Determine The Date Of Completion Of The Project Must Be Included In The Project Description Or The Project Will Not Be Considered. If More Than The Maximum Number Of Projects Is Submitted, The Government Will Only Evaluate Projects Up To The Maximum Number Authorized In The Order Submitted. all Projects Provided In The Sf 330 Must Be Completed By The Actual Office/branch/regional Office/ Individual Team Member Proposed To Manage And Perform Work Under This Contract. Projects Not Meeting This Requirement Will Be Excluded From Consideration In The Evaluation. To Enable Verification, Firms Should Include The Duns Number Along With Each Firm Name In The Sf 330 Part I, Section F, Block 25, “firm Name.” Include A Contract Number Or Project Identification Number In Block 21. Include An E‐ Mail Address And Phone Number For The Point Of Contact In Block 23(c). In Block 24, Include In The Project Description The Contract Period Of Performance, Award Contract Value, Current Contract Value, And A Summary Of The Work Performed That Demonstrates Relevance To Specialized Experience As Outlined Above. For Projects Performed As A Sub-contractor Or A Joint Venture Involving Different Partners, Specifically Indicate The Value Of The Work Performed As A Subcontractor Or By Those Firms Proposed For This Contract, And Identify The Specific Roles And Responsibilities Performed As A Sub-contractor Or By Those Firms On The Project Rather Than The Work Performed On The Project As A Whole. If The Project Description Does Not Clearly Delineate The Work Performed By The Entity/entities Offering/teaming On This Contract, The Firm Will Be Eliminated From Award Consideration. note: If The Firm Is A Joint Venture, Projects Performed By The Joint Venture Should Be Submitted; However, If There Are No Projects Performed By The Joint Venture, Projects Must Be Submitted For Each Joint Venture Partner, Not To Exceed A Total Of Ten (10) Projects. Firms Failing To Provide Projects From All Joint Venture Partners Will Be Considered To Have Not Met The Requirements Of The Criterion. projects Shall Be Submitted On The Sf 330 At Part I, Section F And Shall Be Completed Projects. Projects Not Completed Will Be Excluded From Evaluation Consideration. For Submittal Purposes, A Task Order On An Idiq Contract Is Considered A Project, As Is A Stand‐alone Contract Award. Do Not Submit An Idiq Contract As An Example Project. Instead, List Relevant Task Orders Or Stand‐alone Contract Awards That Fit Within The Definition Above. The Government Will Not Evaluate Information Provided For An Idiq Contract. Examples Of Project Work Submitted That Do Not Conform To This Requirement Will Not Be Evaluated. all Information For Criterion 1 Shall Be Submitted In The Sf 330, Part I, Section F. The Government Will Not Consider Information Submitted In Addition To Part I, Section F In The Evaluation Of Criterion 1. criterion 2—professional Qualifications And Technical Competence (sf 330, Part I, Sections E & G): firms Will Be Evaluated On Professional Qualifications, Competence, And Experience Of The Proposed Key Personnel In Providing Services To Accomplish The Tasks Required Under This Contract, Including Participation In Example Projects In The Sf 330, Part I, Section G. Key Personnel Are Individuals Who Will Have Major Contract Or Project Management Responsibilities And/or Will Provide Unusual Or Unique Expertise. Specific Disciplines That Must Be Included In Key Personnel Are: project Manager(s) senior Architect senior Civil Engineer senior Structural Engineer senior Mechanical Engineer senior Electrical Engineer senior Quality Control Manager senior Fire Protection Engineer (a Licensed Fire Protection Engineer Is Required) key Personnel, Including Consultants, Shall Be U.s. Citizens. submissions Must Demonstrate Key Personnel Relevant Experience, Formal Education (e.g. Bachelor’s Or Master’s Degrees), And Relevant Professional Development Or Professional Certifications. criteria 2 Submission Requirements: sf 330, Part I, Section E – Provide Resumes For All Proposed Key Personnel That Illustrate Experience In The Type Of Work Proposed Under This Contract. Resumes Are Limited To Three Pages And Should Indicate: Professional Registration, Certification, Licensure And/or Accreditation In Appropriate Disciplines; Cite Recent (within The Past 10 Years) Project‐specific Experience In Work Relevant To The Services Required Under This Contract; And Indicate Proposed Role In This Contract. Indicate Participation Of Key Personnel In Example Projects In The Sf 330, Part I, Section G. criterion 3—past Performance (sf 330, Part I, Section H): firms Will Be Evaluated On Past Performance With Government Agencies And Private Industry In Terms Of Work Quality, Compliance With Schedules, Cost Control, And Stakeholder/customer Satisfaction. evaluating Past Performance And Experience Will Include Information Provided In The Contract Performance Assessment Reporting System (cpars) / Architect-engineer Contract Administration Support System (acass) For Criterion 1 Projects And May Include Customer Inquiries, Government Databases, And Other Information Available To The Government Including Contacts With Points Of Contact In Other Criteria. Failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers Could Result In A Firm Being Considered Less Qualified. criteria 3 Submission Requirements: submit A Completed Cpars/acass Evaluation For Each Project Under Criterion 1. If Cpars Or Acass Evaluations Are Not Available For The Projects Identified Under Criterion 1, Then The Firm Shall Provide A Point Of Contact Reference From The Requiring Organization Familiar With The Project Who Can Confirm The Quality Of The Offeror’s Work On The Project. Those References Shall Include Contract/task Order Number, Project Title, Point Of Contact Name, Telephone Numbers, And Email Addresses For The Reference. firms May Provide Any Information On Problems Encountered And The Corrective Actions Taken On Projects Submitted Under Criterion 1—specialized Experience. Firms May Also Address Any Adverse Past Performance Issues. Information Shall Not Exceed Two Double‐sided Pages (or Four Single‐sided Pages) In Total. awards, Letters Of Commendation, Certificates Of Appreciation, Etc. Shall Not Be Submitted And Will Not Be Considered In The Evaluation. criterion 4—quality Control Program (sf 330, Part I, Section H): firms Will Be Evaluated On The Strength Of The Quality Control Program Proposed By The Firm To Ensure Quality Products And Services Under This Contract, And Means Of Ensuring Quality Services From Their Consultants/subcontractors. criteria 4 Submission Requirements: describe The Quality Control Program That Will Be Utilized For All Deliverables Of This Contract And The Management Approach For Quality Control Processes And Procedures. The Description Shall: describe Specific Quality Control Processes And Procedures Proposed For This Contract To Achieve Technical Accuracy Of And Assurance Of Overall Coordination Of Plans And Specifications, And Engineering And Design Services. provide A Quality Control Process Chart Showing The Inter‐relationship Of The Management And Team Components. identify The Key Personnel (submitted Under Criterion 2—professional Qualifications And Technical Competence) Responsible For The Quality Control Program And A Description Of Their Roles And Responsibilities. describe How The Firm’s Quality Control Program Extends To Management Of Sub-contractors. explain The Quality Control Program Including An Example Of How The Plan Has Worked For One Of The Projects Submitted As Part Of Sf 330, Section F Or How The Plan Will Work If It Has Not Been Used Previously. criterion 5—program Management And Capacity (sf 330, Part I, Section H): firms Will Be Evaluated On The Firm’s Ability To Plan For And Manage Work Under The Contract And The Capacity To Accomplish The Work In The Required Time. criteria 5 Submission Requirements: provide An Organizational Chart For The Team And Discuss The Management Plan For This Contract And Personnel Roles In The Organization. Describe The Ability Of The Firm To Manage, Coordinate And Work Effectively With Team Members, Both Internal Staff, Sub-contractors And Consultants. Discuss The History Of Working Relationships With Team Members, Including Joint Venture Partners Where Applicable. describe The Firm’s Present Workload And The Availability Of The Project Team (including Consultants) For The Specified Contract Performance Period. Describe The Workload/availability Of The Key Personnel During The Anticipated Contract Performance Period And The Ability Of The Firm To Provide Qualified Backup Staffing For Key Personnel To Ensure Continuity Of Services. General Statements Of Availability/capacity May Be Considered Less Favorably. describe The Firm’s Ability To Sustain The Loss Of Key Personnel While Accomplishing Work Within Required Time Limits, To Ensure Continuity Of Services And Ability To Meet Surges In Unexpected Project Demands And Ability To Adhere To Schedules And Budgets. criterion 6—firm Location (sf 330, Part I, Section H) firms Will Be Evaluated On The Locations Of Their Office Or Offices That Will Be Performing The Work Under This Contract And Demonstrated Knowledge Of The General Geographic Areas In Which Projects Could Be Located. Evaluation Of Firms Will Include Consideration Of Their Location Within The General Geographic Area Of The Anticipated Projects (primarily At Naval Undersea Warfare Center Newport Division, Newport, Ri). criteria 6 Submission Requirements: indicate Location Of The Office(s) That Will Be Performing The Work, Including Main Offices, Branch Offices, And Offices Of Team Members. provide A Narrative Describing The Team’s Knowledge And Previous Experience Of The Primary Geographic Areas To Be Covered By This Contract. provide A Narrative To Describe The Team’s Ability To Provide Timely Response To Requests For On‐site Support. Provide Timelines And Examples Of The Team’s Success In Providing This Response. Include Both Primary And Sub‐contractor Support As Required. Teams With A Demonstrated History Of Providing Timely Support May Be Considered More Favorably. criterion 7—volume Of Work (sf 330, Part 1, Section H) (tie-breaker) in The Event Of A Tie Among Equally Rated Firms, Those Firms Will Be Evaluated In Accordance With Dod Federal Acquisition Regulation Supplement (dfars) Procedures, Guidance And Information (pgi) 236.602‐1, From Data Extracted From The Federal Procurement Data System (fpds). Firms Will Be Evaluated In Terms Of Work Previously Awarded To The Firm By Dod Within The Past Twelve (12) Months With The Objective Of Effecting An Equitable Distribution Of Contracts Among Qualified A‐e Firms Including Small, Disadvantaged Business Firms, And Firms That Have Not Had Prior Dod A‐e Contracts. criterion 7 Submission Requirements: firms Shall Not Submit Data For This Factor.
Closing Date31 Jan 2025
Tender AmountRefer Documents 

City Of Baguio Tender

Civil And Construction...+1Road Construction
Corrigendum : Closing Date Modified
Philippines
Details: Description 1 Lot Earthwork And Removal Of Actual Structures / Obstruction & Surface Restoration And Paving Works – For The Proposed Installation Of 10” Ø X 60lm Pvc Mainline Along Marcos Highway (balsigan Road Entrance To Campo-sioco Road Entrance) Scope Of Work: Mobilization Work = 1.00 Lot Signages, Safety, And Traffic Management = 1.00 Lot Site Survey = 1.00 Lot Concrete Cutting Works = 380.00 Lm Concrete Breaking Works = 101.00 Sq M Excavation Works • Concrete Excavation = 24.66 Cu M • Soil Excavation = 76.53 Cu M Backfilling And Compaction Works • Sand Bedding And Filling Of Trench = 32.67 Cu M • Soil Backfilling (including Temporary Resurfacing) = 57.21 Cu M • Compaction Of Trench = 57.21 Cu M Restoration Works • Preparation Of Trench (removal / Excavation Of Temporary Resurfacing) = 24.66 Cu M • Boring Of Holes (for Dowel Bars) = 1,458.00 Holes • Fabrication And Installation Of Dowel Bars = 1,714.07 Kgs • Ready Mix Concrete Pouring (3,500 Psi @ 3 Days) = 25.00 Cu M • Asphalt Restoration (instapave) = 26.00 Sq M • Reflectorized Thermoplastic Pavement Markings Restoration = 6.00 Sq M Testing Of Materials (fdt, Tensile Test Of Rebars, Compression Test Of Concrete Cylinders, Flexural Test Of Concrete Beams) = 1.00 Lot Clearing, Hauling, And Disposal Of Unwanted Materials & Debris = 58.69 Cu M Demobilization Work = 1.00 Lot Refer To The Attached Terms Of Reference (tor) And Drawing Plans For Details. Duration: 56 Working Days Approved Budget Cost: ₱1,368,581.40 / Lot X X X X X This Is A Two (2) Envelope System: Documents Comprising The Bid The First Envelope (technical Proposal) Shall Contain The Following: I. Class “a” Documents A. Legal Documents 1. Registration Certificate From The Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives. 2. Mayor’s/business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas. • In Cases Of Recently Expired Mayor’s/business Permits, It Shall Be Accepted Together With The Official Receipt As Proof That The Bidder Has Applied For Renewal Within The Period Prescribed By The Concerned Local Government Unit: Provided, That The Renewed Permit Shall Be Submitted As A Post-qualification Requirement In Accordance With Section 34.2 Of The Irr Of Ra 9184. 3. Tax Clearance Per Executive Order No.398, Series Of 2005, As Finally Reviewed And Approved By Bir. B. Technical Documents 1. Philgeps Certificate Of Registration And Membership In Accordance With Section 8.5.2 Of The Irr Of Ra 9184, Except For Foreign Bidders Participating In The Procurement By A Philippines Foreign Service Office Or Post, Which Shall Submit Their Eligibility Documents Under Section 23.1 Of This Irr: Provided, That The Winning Bidder Shall Register With The Philgeps In Accordance With Section 37.1.4 Of The Irr Of Ra9184. 2. Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid Within The Relevant Period As Provided In The Bidding Documents. The Statement Shall Include, For Each Contract, The Following: A) Name Of The Contract B) Date Of The Contract C) Contract Duration D) Owner’s Name And Address E) Nature Of Work F) Contractor’s Role (whether Sole Contractor Or Partner In A Jv) And Percentage Of Participation G) Total Contract Value At Award H) Date Of Completion Or Estimated Completion Time I) Total Contract Value At Completion, If Applicable; J) Percentages Of Planned And Actual Accomplishments, If Applicable; K) Value Of Outstanding Works, If Applicable; L) The Statement Shall Be Supported By The Notices Of Award And/or Notices To Proceed Issued By The Owners; And M) The Statement Shall Be Supported By The Constructors Performance Evaluation System (cpes) Rating Sheets, And/or Certificates Of Completion And Owner’s Acceptance, If Applicable; 3. Valid Philippine Contractors Accreditation Board (pcab) License Or Special Pcab License In Case Of Joint Ventures, And Registration For The Type And Cost Of The Contract To Be Bid. 4. An Slcc That Is Similar To The Contract To Be Bid, And Whose Value, Adjusted To Current Prices Using The Philippine Statistics Authority (psa) Consumer Price Indices, Must Be At Least Fifty Percent (50%) Of The Abc. Provided, However, That Contractors Under Small A And Small B Categories Without Similar Experience On The Contract To Be Bid May Be Allowed To Bid If The Cost Of Such Contract Is Not More Than The Allowable Range Of Contract Cost (arcc) Of Their Registration Based On The Guidelines As Prescribed By The Pcab. The Slcc Shall Be Supported By An Owner’s Certificate Of Final Acceptance Issued By The Project Owner Other Than The Contractor Or A Final Rating Of At Least Satisfactory In The Constructors Performance Evaluation System (cpes). In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted. 5. Bid Security In Any Of The Following: Form Of Bid Security Amount Of Bid Security (not Less Than The Required Percentage Of The Abc) Cash Or Cashier’s/manager’s Check, Issued By A Universal Or Commercial Bank = 2% Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank. = 2% Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security. = 5% Or Bid Securing Declaration, Which States, Among Others, That The Bidder, Shall Enter Into A Contract With The Procuring Entity And Furnish The Required Performance Security Within Ten (10) Calendar Days, Or Less, As Indicated In The Bidding Documents, From The Receipt Of The Notice Of Award, And Committing To Pay The Corresponding Fine And Be Suspended For A Period Of Time From Being Disqualified To Participate In Any Government Procurement Activity In The Event It Violates Any Of The Conditions Stated Therein As Required In The Guidelines Issued By The Government Procurement Policy Board (gppb). 5. Omnibus Sworn Statement In Accordance With Section 25.3 Of The Irr Of Ra 9184 Which Shall Be Executed By The Prospective Bidder Or Its Duly Authorized Representative 6. Project Requirements: A) Organizational Chart For The Contract To Be Bid; B) List Of Contractor’s Personnel (viz: Project Manager, Project, Engineers, Safety Officers, Materials Engineers, And Foremen, Etc.), To Be Assigned To The Contract To Be Bid, With Their Complete Qualifications And Experience Data; And C) List Of Contractor’s Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be. The Contractor Shall Have The Following Equipment: 1. Cargo / Dump Truck, 2. Rotary Driller With Bit, 3. Generator Set, And 4. Concrete Vibrator 7. Proof Of Payment Of Bidding Documents In The Amount Of ₱5,000.00 8. Statement Of Compliance To All Provisions Of The Terms Of Reference (manner Of Implementation, Qualification, Requirements Of Suppliers / Installers, Technical Specifications) C. Financial Documents 1. Audited Financial Statements, Showing, Among Others, The Prospective Bidder’s Total And Current Assets And Liabilities Stamped “received” By The Bureau Of Internal Revenue (bir) Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year, Which Should Not Be Earlier Than Two (2) Years From Bid Submission. 2. The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Ii. Class “b” Document If Applicable, The Joint Venture Bidders Shall Submit A Joint Venture Agreement In Accordance With Ra 4566 And Its Irr. Each Partner Of The Joint Venture Shall Submit His Or Her Respective Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of The Irr Of Ra 9184. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Its Ongoing Contracts And Audited Financial Statements. The Second Envelope (financial Proposal) Shall Contain The Following: A) Bid Form, Which Includes Bid Prices And Bill Of Quantities B) Detailed Estimates Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals Used In Coming Up With The Bid C) Cash Flow By The Quarter And Payments Schedule All Financial Proposals That Exceed The Abc Shall Be Rejected. Pre-bid Conference: January 2, 2025 9:30am Via Zoom Application Meeting Id: 452 718 8447 Password: 9buvqr
Closing Date14 Jan 2025
Tender AmountPHP 1.3 Million (USD 23.4 K)

DEPT OF THE ARMY USA Tender

Real Estate Service
United States
Details: Rlp Procurement Summary/solicitation – United States Army Corps Of Engineers the U.s. Government, By And Through United States Army Corps Of Engineers (usace), Seeks To Lease The Following Space: state:washington city:longview delineated Area: north:longview City Limits south:longview City Limits east:longview City Limits west:longview City Limits gross Square Feet:4,664 net Square Feet:3,631 space Type:retail gov Parking Spaces (total):9 full Term:60 Months option Term:none address:u.s. Army Corps Of Engineers, Seattle District, Attn: Cenws-res, 4735 East Marginal Way South, Building 1202, Seattle, Washington 98134-2388 email Address:cenwsre-rfp@usace.army.mil real Estate Contracting Officerthomas Seymour Will Be Signing The Lease For The Government. electronic Offer Submission: offers Must Be Submitted Electronically Via Email Listed Above. Offers Are Due On Or Before: 01/30/2025. any Questions Regarding This Solicitation May Be Directed To Primary Or Secondary Points Of Contact Listed In The “contact Information” Section Of This Notice. the U.s. Government, By And Through Usace, Is Seeking To Lease Retail And Related Space In A Building Under A Lease In The City And State Specified Above. The Government’s Desire Is For A Full-service Lease To Include Base Rent, Cam, Utilities, And Janitorial Services For A Retail Space For An Armed Forces Career Center For A Term Of Five (5) Years With Government Termination Rights And Location Within The Delineated Area Specified Above. Non-exclusive Parking For Government Vehicles Must Be Provided 24 Hours 7 Days. Offered Space Must Meet Government Requirements Per The Terms Of The Government Lease. Interested Respondents May Include Building Owners And Representatives With The Exclusive Right To Represent Buildings Owners. Representatives Of Building Owners Must Include The Exclusivity Granting The Exclusive Right To Represent The Building Owner With Their Response To This Advertisement. additional Requirements: space Must Be Located In A Prime Retail Area With Attractive Surroundings With A Prevalence Of Modern Design And/or Tasteful Rehabilitation In Modern Use. space Shall Be Located In A Professional Retail Setting And Preferably Not Within Close Proximity To Residential Areas, Railroad Tracks, Or Power Transmission Lines. space Should Not Be Located Within The 100-year Flood Plain Or Wetland Unless The Government Has Determined It To Be The Only Practicable Alternative. space Should Not Located Near Establishments Whose Primary Operation Is The Sale Of Alcoholic Beverages, Firearms Sold/discharged, Marijuana Dispensaries, Or Where There Are Tenants Or Invitees Related To Drug Treatment Or Detention Facilities. employee And Visitor Entrances Of The Building Must Be Connected To Public Sidewalks Or Street By Continuous, Accessible Sidewalks. regularly Scheduled Public Transportation (if Provided By Municipality) During The Workday Is Required Within 1,000 Feet. parking Must Be Available Per Local Code And Be Available Within Walkable 4 Blocks From The Building. The Parking-to-square -foot Ratio Available Onsite Shall At Least Meet Current Local Code Requirements. Restricted Or Metered Parking Of One Hour Or Less Within The Four-block Area Of The Space Does Not Meet Parking Requirements. subleases Are Not Acceptable. retail Space Should Be On The Ground Floor. space Configuration Shall Be Conducive To An Efficient Layout. Considerations For An Efficient Layout Include, But Are Not Limited To, The Following: Size And Location Of Interior Fire (support) Walls, Size And Number Of Columns, Column Placement, Bay Depts, Window Size And Placement, Convector Size And Placement, Electrical And Telephone Accessibility, And Angles, Curves, Or Offsets That Will Result In An Inefficient Use Of Space. the Following Space Configurations Will Not Be Considered: Space With Atriums And Other Areas Interrupting Contiguous Space, Extremely Long Or Narrow Runs Of Space (more Than Twice As Long As Wide), Irregularly Shaped Space Configurations Or Other Unusual Building Features Adversely Affective Usage. columns Cannot Exceed Two (2’) Square Feet And Space Between Columns And/or Walls Cannot Be Less Than Twenty (20’) Feet. the Offered Space Must Meet Or Be Capable Of Meeting Government Requirements For Security, Fire Life Safety And Handicapped Accessibility. if Space Offered Is Above Ground Level, There Must Be Elevator Access. the Government Requires A Fully Serviced Lease. All Services, Janitorial Supplies, Utilities, And Tenant Alterations Are To Be Provided As Part Of The Rental Consideration. the Government Will Have Access To The Space 24 Hours A Day, 7 Days A Week. Normal Hours Of Operation Are Monday Through Friday 0800 To 1700 (excluding Weekends And Federal Holidays). additionally, Offerors Must Review The Attached Documents Which Contain Other Government Leasing Requirements: request For Lease Proposals exhibit A – Rental Proposal Worksheet, Usace Recruiting Form 1364 exhibit B – U. S. Government Lease For Real Property exhibit C – General Clauses, Gsa Template 3517b exhibit D – Construction And Security Specifications exhibit E – Construction Specifications Bid Proposal Worksheet exhibit F – Janitorial Specifications exhibit G – Sam Representations And Certifications, Gsa Form 3518 exhibit H – Lessor’s Annual Cost Statement, Gsa Form 1217 exhibit I – Certificate Of Authorization exhibit J – Agency Agreement, Authorization For Property Manager To Act On Behalf Of Owner (where Applicable) to Be Responsive, Your Offer Should Be Based On All The Terms, Conditions, And Responsibilities Expressed Throughout The Rlp And Lease And Be Submittedelectronically. Please Review The Rlp And All Attachments Carefully Paying Particular Attention To The Solicitation Requirements. the Following Forms Must Be Completed, Initialed, And/or Signed And Returned Electronically With Your Initial Offer. (note: There May Be Other Required Forms. Refer To The Enclosed Rlp For Details.) exhibit A – Rental Proposal Worksheet, Usace Recruiting Form 1364 exhibit E – Construction Specifications Bid Proposal Worksheet for Your Proposal For New Builds, Please Ensure That You Obtain At Least Three (3) Bids From Contractors To Complete The Build-out Based On The Construction And Security Specifications. Once You Have Obtained Contractors’ Bids, Please Complete, Sign, And Submit The Attached Rental Proposal Worksheet And Construction Specifications Bid Proposal Worksheet. For Existing Spaces, Please Complete, Sign, And Submit The Attached Rental Proposal Worksheet Only; A Completed Construction Specifications Bid Proposal Worksheet Is Not Required. exhibit G – Sam Representations And Certifications, Gsa Form 3518 (if Offeror Is Not Registered In Sam At The Time Of The Offer Submission) exhibit H – Lessor’s Annual Cost Statement, Gsa Form 1217 exhibit K – Seismic Offer Forms (where Applicable) evidence Of Ownership (warranty Deed) Or Control Of Building Or Site. please Note That You Arenot Requiredto Initial And Return The Following Documents At This Time: request For Lease Proposal (rlp) exhibit B – U. S. Government Lease For Real Property exhibit C – General Clauses, Gsa Template 3517b exhibit D – Construction And Security Specifications exhibit F – Janitorial Specifications exhibit I – Certificate Of Authorization please Review All The Attached Documents Thoroughly To Obtain A Complete Understanding Of The Government’s Requirements. One Item Of Note In The General Clauses, Gsa Form 3517b, Is The Requirement To Register In The System For Award Management (sam) At Www.sam.gov (general Clause 17, Cfr 52.204-7). This Registration Is Mandatory For Any Entity Wishing To Do Business With The Government And Must Be Completed At The Time Of Lease Award. Entities Not Currently Registered In Sam Are Advised To Start The Registration Process As Soon As Possible. after Receipt Of All Proposals, Conclusions Of Any Discussions, And Receipt Of Best And Final Offers, The Government Will Select A Location Based On The Best Value Specified In The Enclosed Rlp. Past Performance, If Applicable, Will Also Be Taken Into Consideration. The Selection Is Expected To Occur Approximately Thirty (30) Days Following The Initial Proposal Response Date Stated Above. A Government Market Survey, Appraisal, Or Value Estimate Will Be Conducted To Determine Fair Market Rental Value. offered Space Must Meet Government Requirements For Fire Safety, Accessibility, Seismic, And Sustainability Standards Per The Terms Of The Lease. Offered Space Shall Not Be In The 1-percent-annual Chance Floodplain (formerly Referred To As “100-year” Floodplain). entities Are Advised To Familiarize Themselves With The Telecommunications Prohibitions Outlined Under Section 889 Of The Fy19 National Defense Authorization Act (ndaa), As Implemented By The Federal Acquisition Regulation (far).). For More Information, Visit: Https://acquisition.gov/far-case-2019-009/889_part_b. funds May Or May Not Be Presently Available For This Effort. No Award Will Be Made Under This Solicitation Until Funds Are Available. The Government Reserves The Right To Cancel This Solicitation, Either Before Or After The Closing Date For Receipt Of Proposals. In The Event The Government Cancels This Solicitation, The Government Has No Obligation To Reimburse Offeror(s) For Any Cost.
Closing Date31 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Civil And Construction...+1Building Construction
Corrigendum : Closing Date Modified
United States
Details: The Work For This Project Includes The Construction (design-bid-build) Of A Guam Defense Radar System Command Center (cc), Power Generation Facility, Switchgear Building, Fuel Storage Facility, Entry Control Facility, And Associated Equipment. The Cc Will Include Functional Areas To Accommodate Personnel, Computing Equipment, User Interfaces, And Communications Needed For Planning, Controlling, And Directing Mission Activities. The Power Generation Facility Will Provide Power Via The Switchgear Facility For The Command Center And Associated Infrastructure With Fuel From The Storage Facility Consisting Of Above Ground Fuel Tanks, Fuel Off-loading Infrastructure, And Associated Containment. The Cc Facility And Power Generation Facility Will Be Designed For Risk Category Iv To Meet Site Specific Ground Motion And Seismic Requirements To Include Base Isolation. construction Scope And Methods That Will Be Required As Part Of This Project Include, But Are Not Limited To: demolition Of Existing Housing Units And The Associated Mitigation/disposal Of Asbestos, Lead Contaminated Materials, And Pesticide Contaminated Soil civil Site Work, Including Grading, Paving, And Retaining Walls concrete Construction Meeting The Requirements Of Icc-500 Storm Shelter And Including Coordination Of Cast-in-place, Tilt-up, And Precast Elements 150 Foot Galvanized Steel Antenna Tower And Associated Foundation seismic Isolation Bearings Requiring A Specialized Installation Procedure And Building Erection Sequence Involving Extensive Construction Shoring And Bracing protection Measures For Nonstructural Components, Including Flex Loops For Piping & Conduit To Accommodate Seismic Movement security Infrastructure Includes Real Property Features To Support The Installation Of Security System Level (ssl)-c And Integrated Electronic Security System (iess), Site Security Measures, Entry Control, And Material Procurement & Inspection Requirements facilities Will Be Designed To Provide Cyber Security Engineering And Validation control System Integration Requiring The Aggregation Of Multiple Control Systems, Including Building Controls, Fuel System Controls, And Utility Controls complex Schedule Due To The Nature Of The Concrete & Isolated Foundation Construction, Long Lead Times For Major Equipment Such As Tier 2 Emergency Generators And Mechanical Equipment, And Multiple Joint Occupancy Date (jod) Milestones In The Construction Schedule To Accommodate Work Of Other Contractors Outfitting Systems, Installing Equipment, And Integrating Controls electrical (lighting And Distribution), Fiber Optic And Telecommunications, Fire Protection, Sanitary Sewer, And Storm Drainage the Work Will Include Four (4) Pre-priced Options. Option 1 Is The Price For One Generator And Fuel Tank #2. Option 2 Is The Price For One Generator. Option 3 Is The Price For One Generator. Option 4 Is The Price For The Uninterruptible Power Supply In The Command Center. Option 5 Is The Price For B-side Systems And Equipment In The Power Plant And Command Center. In Accordance With Far 52.217-7 Option For Increased Quantity – Separately Priced Line Item, The Government May Exercise The Options By Written Notice To The Contractor Within 365 Days Of Contract Award. the Magnitude Of This Project Is Estimated Between $250,000,000 And $500,000,000. The North American Industry Classification System (naics) Code Is 236220 And Average Annual Receipts Is $45.0 Million Over The Past Three Years. The Contract Completion Period Is Anticipated To Be 1,323 Calendar Days. a Sources Sought Notice (n62742gdscc) For This Procurement Was Posted On 16 March 2024 On The System For Award Management (sam) Website Https://www.ssam.gov/, And A Market Survey Was Conducted That Included An Assessment Of Relevant Qualifications And Capabilities Of Potentially Qualified Firms. As A Result Of The Market Research Analysis, A Determination Was Made To Solicit This Procurement On An Unrestricted Basis Inviting Full And Open Competition. The Navfac Pacific Small Business Office Concurs With This Decision. this Is A Best-value, Trade Off Source Selection Procurement Requiring The Submission Of Both Non-price And Price Proposals. All Technical Factors, When Combined Are Of Equal Importance To Past Performance; And All Evaluation Factors Other Than Price, When Combined, Are Approximately Equal To Price. Proposals Submitted In Response To This Solicitation Shall Be In The English Language And In U.s. Dollars. contract Award Will Be Made To The Responsible Offeror Whose Offer, Conforming To The Solicitation, Is Determined To Be The Lowest Evaluated Price Of Proposals Meeting Or Exceeding The Acceptability Standards For Technical Factors. The Technical Factors Are As Follows: (1) Experience, (2) Small Business Utilization And Participation, (3) Safety, (4) Management Plan, And (5) Past Performance. For Evaluation Of Experience And Past Performance, A Relevant Construction Project Is Defined As: new Construction Of An Administrative, Office Or Communications Facility Approximately $80 Million Or More In Dollar Value And Completed Or Substantially Completed Within The Past Ten (10) Years From The Date Of Issuance Of The Solicitation. new Construction Of A Secure Space Conforming To The Requirements Of Icd-705 Approximately $10 Million Or More In Dollar Value And Completed Or Substantially Completed Within The Past Ten (10) Years From The Date Of The Issuance Of The Solicitation. new Construction Of Essential Facilities Located In Moderate To High Seismic Areas Approximately $80 Million Or More In Dollar Value And Completed Or Substantially Completed Within The Past Ten (10) Years From The Date Of The Issuance Of The Solicitation. “moderate To High Seismic Areas” Are Defined As Geographic Areas With A Peak Ground Acceleration (pga) Greater Than 0.5g And A Probability Of Ground Motion Exceedance Equal Or Less Than 2% In 50 Years. The Whole Building Design Guide (wbdg) Structural Load Tool For Ufc 3-301-01 Can Be Used To Identify The Pga Of Geographic Areas. This Tool Can Be Found At Structural Load Data Tool For Ufc 3-301-01 | Wbdg - Whole Building Design Guide. Examples Of Areas With These Characteristics Include But Are Not Limited To Guam, California, Alaska, And Japan. the Request For Proposal (rfp) Will Be Available On 30 October 2024. Printed Copies Of The Rfp Will Not Be Issued. The Rfp, Including The Specifications And Drawings, Can Be Accessed Via The System For Award Management (sam) Website At Https://sam.gov/. Contractors Must Register At The Sam Website To Obtain Access To The Rfp. Registration Instructions Can Be Found On The Sam Website. Amendments Will Also Be Posted At Https://sam.gov/. It Is Highly Recommended That Firms Register On The Sam Website As This Will Be The Only Plan Holder’s List Available. It Is The Offeror’s Responsibility To Check The Sam Website Periodically For Any Amendments To The Solicitation. a One-time Pre-proposal Site Visit Has Been Scheduled For 11 December 2024, 9:00 A.m. Chamorro Standard Time (chst). The Pre-proposal Site Visit Is To Provide Offerors With An Opportunity To Familiarize Themselves With The Jobsite And Conditions To Be Encountered, And It Is Not For The Purpose Of Answering Questions. Offerors Interested In Attending The Site Visit Shall Submit The Following Forms: base Access Request – Contractor Memo (fill-in Information In Red). iii Log (complete In Accordance With The Attached “how To Fill Out The Iii Log” Instructions Located At The End Of This Document.) base Access Affidavit 2020 (completed For Each Visitor That Does Not Have Dbids Pass) foreign National Access Request Form contractor Policy Update Memo either A U.s. Passport Or Real Id Act Driver’s License/id the Completed Forms Shall Be Submitted To Dayna Matsumura, Contract Specialist, At Dayna.n.matsumura.civ@us.navy.mil On Or Before 14 November 2024, 2:00 P.m., Hawaii Standard Time (hst). Once Approved For Base Access, A Tracking Number Will Be Emailed To Attendees For Use When Obtaining Base Passes At The Visitor Control Center (northgate), Andersen Air Force Base. please Be Informed: The Visitor Control Center (northgate) Requires Sufficient Processing Time For Each Visitor. Consequently, If An Attendee Submits The Application Forms After The Specified Due Date And Time, The Attendee May Not Be Able To Attend The Site Visit. the Furnishing Of The Above Information, Including Your Social Security Number, Is Voluntary. However, Your Failure To Furnish All Or Part Of The Information Request May Result In The Government's Denial Of Access To The Jobsite. Any Of The Above Information Furnished By You And Protected Under The Privacy Act Shall Not Be Released Unless Permitted By Law And/or You Have Consented To Such Release. upon Receipt Of The Above Information, Our Office Will Submit A Letter To The Pass And Id Office Authorizing Your Entrance. on The Day Of The Visit, Attendees Shall Meet Promptly At The Pacific Regional Training Center (prtc) Gate And Bring Necessary Base Access Pass, The “iii Log” And “new Contractor Letter Memorandum” To The Site Visit. For Those That Do Not Have Dbids, Pick Up An Approved Day Pass From The Visitor’s Center (northgate). Attendees Shall Meet At The Visitor Control Center Overflow Parking Lot.
Closing Date14 Feb 2025
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Healthcare and Medicine
United States
Details: Sources Sought Notice: The Department Of Veterans Affairs, Network Contracting Office 4 (nco 04), Is Conducting A Market Survey To Identify Potential Sources To Provide A 12-month Contract To Supply Ga68 Dotatate (netspot). This Radiopharmaceutical Is Required For Imaging Procedures For The Corporal Michael J. Crescenz Va Medical Center- 3900 Woodland Avenue, Philadelphia, Pennsylvania 19104. this Notice Is Issued For Informational Planning Purposes Only And Is Not A Request For Quote Or Announcement Of A Solicitation. Submitting Information For This Notice Is Voluntary And Va Assumes No Responsibility For Any Costs Incurred Associated With The Preparation Of Responses Submitted Because Of This Notice. No Solicitation Is Available At This Time. If A Solicitation Is Issued It Will Be Announced At A Later Date, And All Interested Parties Must Respond To That Solicitation Announcement Separately From The Responses To This Announcement. the Purpose Of This Market Research Is To Identify Capable Sources That Are Both Experienced And Qualified To Provide The Desktop Automated Csf In Accordance With Performance Work Statement. the North American Industry Classification System Code (naics) Is 325412 Medical Laboratories, And The Small Business Size Standard Is 1300 Employees For This Type Of Effort. vendors Must Be Registered In The System For Award Management (sam) At Https://www.sam.gov And Shall Complete Electronic Annual Representations And Certifications In Sam Prior To Award Of Contract. If You Are Responding As A Service-disabled Veteran Owned Small Businesses Or Veteran Owned Small Businesses (sdvosb S And Vosb S), Your Company Must Be Registered In Vetcert And Maintain A Current Certification (https://veterans.certify.sba.gov). capability Statement And Documentation: companies Are To Provide A Summary Of Your Firm S Capabilities, Experience, And Knowledge In Providing These Services. Sources Are Asked To Provide The Following Information: 1. Company Information: Company Name Company Address Company Uei Sam Company Naics Code(s) Point Of Contact Name Point Of Contact Phone Number Point Of Contact Email Address Company Website (if Available) 2. The North American Industry Classification System Code (naics) Is 325412 Medical Laboratories, And The Small Business Size Standard Is 1300. based On This Information, Please Indicate Whether Your Company Is A: service-disabled Veteran Owned Small Business (sdvosb) veteran Owned Small Business (vosb) 8(a) hub Zone Small Business women Owned Small Business small Disadvantaged Business (sdb) small Business Concern large Business 3. Provide A Summary Of Your Firm S Ability/ Capability To Meet The Services Described In This Notice (see Attached Pws). 4. Government Contracts For These Services In The Last 3 Years. Include: government Agency contract Number dollar Value period Of Performance government Point Of Contact Information (name, Email, Phone Number) information Regarding Your Company S Capacity And Capability To Provide Such Services Are To Be Submitted Electronically On Or Before 4:00 Pm, Wednesday, 01/29/2025 Addressed To Christa Stine, Contract Specialist Christa.stine@va.gov. performance Work Statement date december 6, 2024 client philadelphia Veterans Affairs Medical Center job Name netspot Ga68 Dotatate requested By betty Taylor, Supervisor from tarideana Breazeale, Administration Officer summary the Corporal Michael J. Crescenz Va Medical Center (cmc Vamc) Requires A Vendor Licensed By The Nuclear Regulatory Commission To Provide The Radiopharmaceutical Netspot And Calibration Sources For The Nuclear Medicine Service. This Radiopharmaceutical Is Required For Imaging Procedures. The Calibration Sources Are Required For Equipment Quality Control Testing. This Product Is A Patented Drug Kit For The Preparation Of Gallium Ga 68 Dotatate For Injection. It Is Used For Pet Imaging For Localization Of Somatostatin Receptor Positive Neuroendocrine Tumors (nets) In Adult Patients. These Items Are To Be Delivered Directly To The Nuclear Medicine Service S Secured Receiving Areas, Room 3a101b Of The Corporal Michael J. Crescenz Va Medical Center 3900 Woodland Avenue, Philadelphia, Pennsylvania 19104. project Scope this Pws Covers The Following Activities And Deliverables. The Vendor Agrees To Perform These Services With The Standard Of Care, Skill, And Diligence Normally Provided By A Professional Organization In The Performance Of Similar Services. It Is Understood That The Contractor Must Perform The Services Based, In Part, On Information Furnished By This Medical Center; However, The Vendor Is Given Notice That The Medical Center Will Be Relying On The Accuracy, Competence And Completeness Of The Contractor S Services In Utilizing The Results Of Such Services. The Nuclear Medicine Authorized Staff Of Cmc Vamc, When Needed For Next Day Delivery During Work Hours Will Place All Orders Daily. There May Be Orders Placed During Other Than Normal Working Hours, To Be Delivered Within A 45-minute Window For An Emergency. The Vendor Must Be Able To Fulfill This Requirement. All Items Delivered To The Nuclear Medicine Department As Specified Above. Cmc Vamc Will Require Credit Statements (itemized Returned Doses) And Monthly Invoices. Electronic Daily Dose Tracking Systems Should Be Available For The Medical Center S Use In Certifying And Tracking Of Patient Doses Delivered. deliverables: unit Per Dose netspot the Contractor Shall Have Available An Adequate Supply Of Contract Products To Meet The Requirements Of The Corporal Michael J. Crescenz Va Medical Center. the Contractor Shall Label All Unit Doses Of Delivered Radiopharmaceuticals, With The Amounts, Preparation Time, Expiration Time, Date, Etc., And Provide A Bar Labeled Insert To Allow Scanning Data Into The Nuclear Medicine Information Management System (nmis).if The Contractor S System Varies From Our Current (pinestar) Nmis Information System, The Contractor Shall Provide Their System As Well As Data Migration, Technical Support And Training Of Staff On Its Use At No Additional Price To The Government. all Packaging Of Radioactive Material Must Be Clearly Labeled Radioactive With The Proper Class And Exposure Levels On The Outside Of The Shipping Container. the Contractor Shall Perform All Quality Control Procedures As Required By Federal And State Regulatory Agencies. the Contractor Shall Meet All Nuclear Regulatory Commission, Department Of Transportation, Nhpp, Fda, Osha And All Other Agency Rules And Regulations (federal And State). radiopharmaceutical Returns For Credit: the Contractor Shall Be Responsible To Accept Returns For Full Credit Toward Future Orders Only Under The Following Conditions: product(s) Ordered Or Shipped In Error product(s) Damaged In Shipment concealed Shipping Damages recalled Product(s) outdated Products In Unopened, Original Container (specifically Authorized For Return By Manufacture) the Contractor Shall Invoice At Least Once Per Month Showing Period Covered, Billing Date, Name Of Preparation, Quantity, And Amount. schedule only Authorized Cmc Vamc Nuclear Medicine Service Personnel Shall Place Orders During The Normal Workday, And First Delivery Shall Be Received No Later Than 08:00 Am The Following Workday To The Cmcvamc Nuclear Medicine Department. depending On Medical Center Patient Care Requirements, The Contractor Shall Provide Routine Delivery And Pick-up As Many Times As Required By The Cmcvamc. the Delivery Order Shall Include The Following Information: contract Item(s) And Quantity, Time (s) Of Delivery, And Applicable Va Order Number. authorized Cmcvamc Personnel Via Telephone, Fax, Or E-mail Shall Only Place Orders. Contractor Agrees To Accept Unused Radiopharmaceutical And Provide Reimbursement Per Unit Dose Applicable Towards Future Orders. after Award, The Cmcvamc Will Furnish The Name(s) Of Personnel Who Are Authorized To Place Orders Against The Contract. the Contractor Will Be Furnished With A Copy Of The User S License As Per Nuclear Regulatory Commission Guidelines. same-day Delivery same-day Delivery Requires Delivery And Receipt At The Cmcvamc Nuclear Medicine Department No Later Than 2 Hours After Order Is Placed During Normal Business Hours. Nuclear Medicine Normal Business Hours Are Considered Monday Through Friday: 8:00 Am 4:30 Pm Except Federal Holidays. the Following Are Federal Holidays: new Year S Day martin Luther King, Jr. Day president S Day memorial Day juneteenth independence Day labor Day columbus Day veteran S Day thanksgiving christmas Day pricing items Will Be In Unit Dose, Daily, And On An As Needed Basis In Accordance With Patient Requirements. key Assumptions all Annual Quantities Are Estimates, Contractor Will Only Be Paid For Items And Quantities That Are Ordered And Delivered.
Closing Date28 Jan 2025
Tender AmountRefer Documents 
7351-7360 of 7496 archived Tenders