Survey Tenders
Survey Tenders
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Others
United States
Details: This Is A Request For Information (rfi) Only. This Is Not A Request For Proposal (rfp) Or A Request For Quote (rfq). The Department Of Veterans Affairs Is Not Soliciting Offers Of Any Kind. No Contract Award Will Be Made On The Basis Of Any Response(s) To This Notice. All Information Received In Response To This Rfi That Is Marked As Proprietary Will Be Handled Accordingly. In Accordance With Far 15.201(e), Responses To This Notice Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract. Responders Are Solely Responsible For All Expenses Associated With Responding To This Rfi. In Accordance With The Federal Acquisition Regulation (far) Part 10 On Market Research And Public Law 109-461, The Department Of Veterans Affairs Is Conducting Market Research To Identify Verified Service-disabled Veteran-owned Small Business (sdvosb) Concerns That Have The Capability To Provide Contractor Support Services To The Government At A Fair And Reasonable Price. This Announcement Is For Informational And Planning Purposes Only And Should Not Be Interpreted As A Commitment By The Government To Issue A Solicitation Or Award A Contract. A Sources Sought Notice (36c776-24-q-0280) Was Posted On Sam.gov On July 22, 2024. Initially, The Va Sought To Consolidate Acquisition Support Services And Acquisition Utilization Services Into A Single Indefinite Delivery, Indefinite Quantity (idiq) Contract. However, The Va Has Decided That Combining The Roles Of 1101 And 1102 Is Not The Best Approach. This Request For Information (rfi) Aims To Inform The Industry Of Our Revised Plan To Conduct Market Research Specifically For 1102 Contract Specialist Support Only. The U.s. Department Of Veterans Affairs (va), Veterans Health Administration (vha), Regional Procurement Office Central (rpo-c) Has A Need For An Experienced Contractor Who Has Five (5) Or More Years Of Experience Supplying Acquisition Support Services To Federal Agencies.â The Contractor Is Needed To Assist Various Contracting Teams In Their Procurement Requirements. The Contractor Shall Provide Experienced Entry-level Contract Support (ecs), Mid-level Contract Support (mcs), And Senior Contract Support (scs). Contractor Acquisition Support Services Will Be Required Throughout The Life Of This Contract. The Contractor S Office And Contractor Personnel Shall Be Located Within The Continental United States, Alaska, Hawaii And Puerto Rico. The Contractor Shall Provide Non-personal, Non-inherently Governmental Acquisition Support Services In Support Of The Vha S Contracting Offices. The Contractor And Contractor Personnel Shall Not Be Designated As The Co Or Cor Or Make Decisions; Rather They Will Support The Various Va Procurement Teams In Their Procurement Needs. Contractor Personnel May Not Supervise Or Otherwise Direct Government Employees. Va Cos, Css, Cors And Other Staff Shall Ultimately Be Responsible For Making Decisions On Behalf Of Va.â Final Contract Support Services Performance Work Statement (pws) Introduction The U.s. Department Of Veterans Affairs (va), Veterans Health Administration (vha), Regional Procurement Office - Central (rpo-c) Has A Need For Contract Support Services To Assist Various Vha Central Region Contracting Teams In Their Procurement Requirements. The Contractor Shall Provide Experienced Contract Acquisition Specialists As Outlined In Section 4 Of This Performance Work Statement (pws). Scope Of Work Contractor Support Services Will Be Required Throughout The Life Of This Contract. The Contractor S Office And Contractor Personnel Shall Be Located Within The Continental United States, Alaska, Hawaii And Puerto Rico. The Contractor Shall Provide Non-personal, Non-inherently Governmental Contract Support Services In Support Of The Vha S Contracting Offices. The Contractor And Contractor Personnel Shall Not Be Designated As The Co Or Cor Or Make Decisions; Rather They Will Support The Various Va Procurement Teams In Their Procurement Needs. Contractor Personnel May Not Supervise Or Otherwise Direct Government Employees. Va Cos, Css, Cors And Other Staff Shall Ultimately Be Responsible For Making Decisions On Behalf Of Va. Contract Support Services May Include, But Are Not Limited To Strategy, Planning, Data Analysis, Requirements And/or Documentation Development, Preparing Independent Government Cost Estimate (igce), Compliance Reviews For Acquisition Documents And Forms. Services May Include Advisory Support And Assisting Functional Area Technical Experts With The Development Of Writing Requirements Into Sound/sufficient Statement Of Work (sow), Pws And/or Orders. Other Support Functions May Include Acquisition Planning, Solicitation Preparation, Market Research/analysis, Source Selection Document Preparation, Administration Of Terms And Conditions, Preparing Contract Modifications And Documents, Cost/price Analysis, Development Of Analytics, Creating Reports, Preparation Of Contract Termination Documents, And Drafting Contract Close-out Documents. Successful Performance Of This Contract Requires A Wide Variety Of Associated Procurement Skills And Activities Including Research, Analysis, Data Entry, Writing, Document Preparation, Editing, Scanning, Document Management, Phone Calls, Faxing, Filing, And Other Activities As Necessary To Complete The Tasks Assigned. Description Of Services During The Life Of The Resulting Contract The Contractor Will Be Required To Provide Three Contract Support Categories Which Include Diverse And Various Support Responsibilities In Support Of The Nco/pcac. The Contractor Shall Provide Qualified Personnel Who Can Perform Cradle To Grave Acquisitions Functions In Accordance With The Federal Acquisition Regulations (far), Veterans Affairs Acquisition Regulation (vaar), And All Other Applicable Regulations And Policies. Contractor Personnel Shall Perform Pre-award Procurement Functions Such As Requirements Definition, Market Research, Drafting Contractual Documents Such As Solicitations, Awards, And Amendments Using The Electronic Contract Management System (ecms), Coordinating With Requiring Activities, Industry, And Other Stakeholders, And Completing Contractual Files. Contractor Personnel Shall Perform Post-award Procurement Functions Such As Drafting Modifications, Drafting Option Year Notices And Modifications, Monitoring Contractor Performance, And Preparing Contracts For Close-out. Requirement Qualifications And Categories Minimum Qualifications: Each Proposed Candidate Shall Possess All The Demonstrated Experience And Educational Requirements Described In This Section For The Specific Discipline Needed On Each Task Order Executed. Pre-screened Detailed Resumes Showing Work Experience (to Include Actual Duties Performed, Contract Types And Actions; Not Only Job Descriptions) Must Be Submitted To And Approved By The Cor To Start The Onboarding Process. If An Nco/pcac Is Looking For A Specific Type Of Acquisition Experience, Such As Construction, Complex Services, And/or Leasing, The Contractor Will Be Advised When A Task Order Is Issued. Entry-level Contract Support (ecs): Each Proposed Ecs Shall Possess All The Demonstrated Experience And Educational Requirements As Delineated In This Section. Experience Must Reflect Abilities To Support Federal Acquisitions. In Respect To The Minimum Qualifications, One Qualification May Not Be Substituted For Another. Each Applicant Must Possess All Minimum Qualifications. Education: Four (4) Years Above High School From An Accredited College Or University As Recognized By The Secretary, U.s. Department Of Education. Experience: The Ecs Shall Have A Minimum Of Two (2) Years Of Federal Contracting Experience Working On Government Acquisitions Within The Last Five (5) Years. Additional Required Knowledge And Skills: In Addition To The Experience And Educational Requirements Described In Sections 4.1.1. And 4.1.2., The Ecs Must Possess The Following Knowledge And Skills: Ability To Conduct Comprehensive Review Of Procurement Documents For Accuracy, Adequacy, And Completeness. Ability To Identify And Resolve Inconsistencies Through Communication. Ability To Read And Interpret Federal And Agency Acquisition Policy, Regulations, And Directives. Ability To Draft And Prepare Contract Related Documents And Forms. Ability To Perform And/or Evaluate Market Research, Trends, Conditions, Alternative Sources, And Technological Advances As They Apply To The Program. Ability To Prepare And Process Purchase Requisitions And Procurement Packages To The Supporting Co For Award. Ability To Research, Analyze, Prepare, And Review Invoice Receipts, Receiving Reports, Fund Status, Final Payments, Release Of Claims, Certificates Of Completion, Close-out Documents, And Any Additional Supporting Documents Or Activities Needed For Contract Closeout. Ability To Investigate, Review, And Prepare Open Obligations/undelivered Orders (udo) For Closeout. Ability To Perform Post-award Administration In Support Of Co. Ability To Monitor Quality Assurance Surveillance Plans (qasps) To Ensure Contracted Services Meet Contract Requirements Along With The Expectations And Needs Of The Facility. Mid-level Contract Support (mcs): The Mcs Shall Possess All The Demonstrated Experience And Educational Requirements Delineated In This Section. Experience Must Reflect Abilities To Support Federal Acquisitions. In Respect To The Minimum Qualifications, One Qualification May Not Be Substituted For Another. Each Candidate Must Possess All Minimum Qualifications As Verified By A Signed And Dated Resume By The Individual And A Corporate Executive. Resume Must Reflect Documented Experience Of Pre- And Post-award Acquisition Processes And Activities. Experience: A Minimum Of Three (3) Recent Years (within The Last Five Years) Relevant Experience In Conducting Comprehensive Contract Acquisition Support Services With Knowledge Of Federal Acquisition Regulation (far), Veterans Affairs Acquisition Regulation (vaar), And All Other Applicable Regulations And Policies. Education: Bachelor's Degree With A Major In Any Field; Or At Least Twenty-four (24) Semester Hours In Any Combination Of The Following Fields: Accounting, Business, Finance, Law, Contracts, Purchasing, Economics, Industrial Management, Marketing, Quantitative Methods, And Organization And Management. Additional Knowledge And Skills: In Addition To The Experience And Educational Requirements Described In Sections 4.2.1. And 4.2.2., The Mcs Must Possess The Knowledge And Skills Of An Ecs As Described In Section 4.1.3. As Well As The Following Knowledge And Skills: Possess A Working Knowledge Of The Federal Acquisition Life Cycle. Ability To Conduct Comprehensive Research And Analysis Of Technical And Cost/price Data. Ability To Read And Interpret Federal Acquisition Policy, Regulations, And Directives. Ability To Review And/or Write Requirements, Ensuring Receipt Of Sound And Sufficient Procurement Packages Submitted By Nco Customers. Ability To Provide Business Advice And Assistance To Functional Area Technical Experts, Requiring Activities, And Customers. Ability To Analyze And Assist In The Development Of Igces. Ability To Work With The Technical Experts And The Co To Ensure Project Milestones Are Reflected In The Contractual Documents And Project Plan. Ability To Plan, Coordinate, Evaluate, And Execute The Logistical Actions Required To Support The Mission Of The Organization. Ability To Support, Coordinate, And Assist With The Planning, Preparing, Developing, Executing, And Maintaining Of Current Acquisition Plans, Strategies, And Overall Program Office Acquisition Administration Functions Including Program Control And Tracking. Ability To Research And Review All Applicable Policies, Guidance, And Regulations To Support The Customer And Contracting Officer (co) In Their Decision Making. Ability To Coordinate With Leadership, Staff, And Other Stakeholders To Conduct Analyses And Recommend Or Develop A Course Of Action. Ability To Assist In The Performance Of Cost Benefit Analysis. Ability To Analyze And Evaluate Pricing Data And Other Types Of Pricing Information To Draft A Price Reasonableness Recommendation For The Co. Ability To Establish Parameters And Maintain Controls To Ensure Contracts Are Executed In Accordance With Terms And Conditions. Ability To Assist With Monitoring Contract Performance Over The Life Of The Concerning Contract And Demonstrate The Ability To Solve A Broad Range Of Problems Relating To Proposals For Change, Claims, Payments, And Similar Problems. Ability To Prepare Or Draft Contract Modifications And Associated Modification Documentation Requirements. Ability To Support Cos And Css On All Phases Of Acquisition For Contract Modifications, Change Orders, Supplemental Agreements And Delivery Order Processes Including Requirements Requiring Definitions, Justification And Approval For Service Contract Extension, Method Of Contracting, Evaluation Of Proposals And Advice Concerning Contract Administration. Senior Contract Support (scs): The Scs Must Possess All The Demonstrated Experience And Knowledge Requirements Delineated In This Section. Experience Must Reflect Abilities To Support All Federal Acquisitions Regardless Of Acquisition Type Or Dollar Value. In Respect To The Minimum Qualifications, One Qualification May Not Be Substituted For Another. Each Candidate Must Possess All Minimum Qualifications As Verified By A Signed And Dated Resume By The Individual And A Corporate Executive. Resume Must Reflect Abilities To Support All Aspects Of Acquisition To Include Experience With Contracts Greater Than The Sat. Experience: A Minimum Of Five (5) Recent Years Within The Last Seven (7) Years Relevant Experience In Conducting Comprehensive And Complex Contract Acquisition Support Services With An Extensive Knowledge Of The Far, Veterans Affairs Acquisition Regulation (vaar), And All Other Applicable Regulations And Policies. Resume Must Reflect Documented Experience Of Pre- And Post-award Acquisition Processes And Activities Along With Related Training And Certifications. 4.3.1.1. Construction/architect-engineering (ae) Specialized Experience Requirements. Ability To Apply The Required Knowledge Of Laws, Regulations, And Procedures To The Act Of Properly Issuing And Administering A Construction Contract In Accordance With Federal Acquisition Laws, Regulations, And Best Business Practices. Have Knowledge Of Construction And Ae Contracting Request And Develop Construction/ae Solicitation Packages In Accordance With Far, Vaar, And Agency Policies And Procedures. Familiar With Far Part(s) 14, 15, 36, And 43. Unless Otherwise Approved By The Va Any Scs (who Meets The 5 Years General Experience Requirement) Who Will Be Specializing In Construction/ae Requirements Must Also Have The Following Experience: (1) 3 Years Of Experience In Developing Ae Solicitations And Administrating Ae Contracts And Modifications; (2) 3 Years Of Experience Developing Construction Solicitations And Administering Construction Contracts And Modifications All Within The Guidelines Set Forth In Paragraph 4.3.1. 4.3.1.2. Complex Service Contracts (such As Health Care Contracts) Experience Requirements. Have In-depth Knowledge Of Far 13/15. Familiarity With Medical Language. Any Scs (who Meets The 5 Years General Experience Requirement) Who Will Be Specializing In Complex Service Contracts Must Also Have The Following Experience: 5 Years Of Experience Developing Complex Service Solicitations And Administering Complex Service Contracts And Modifications All Within The Guidelines Set Forth In Paragraph 4.3.1. 4.3.1.3. Leasing And Specialized Experience Requirements: Be Familiar With Real Property Leasing, Utilities Contracts, Sharing Of Space And Other Non-medical Agreements (selling/sharing Agreements, Revokable Licenses, Interagency Agreements), And Hotel Services For Veterans Using Procedures Outlined In The Far, Vaar, General Services Acquisition Manual (gsam), General Services Acquisition Regulation (gsar), Public Laws, And Agency Policy. Unless Otherwise Approved By The Va Any Scs (who Meets The 5 Years General Experience Requirement) Who Will Be Specializing In Leasing And Specialized Contracts Must Also Have The Following Experience: 2 Years Of Experience Developing Real Property/lease Related Solicitations, Contracts And Modifications All Within The Guidelines Set Forth In Paragraph 4.3.1. Education: Bachelor's Degree With A Major In Any Field; Or At Least Twenty-four (24) Semester Hours In Any Combination Of The Following Fields: Accounting, Business, Finance, Law, Contracts, Purchasing, Economics, Industrial Management, Marketing, Quantitative Methods, And Organization And Management. A Federal Acquisition Certification In Contracting (fac-c Level I, Ii, Or Iii), Fac-c (professional), Or Dawia Level Iii In Contacting Certification Or Courses Leading To Certification, Or Demonstration Of The Completion Of Commercial Courses Equivalent To Certification. Additional Knowledge And Skills: In Addition To The Experience And Educational Requirements Described In Sections 4.3.1. And 4.3.2., The Scs Shall Possess The Following Knowledge And Skills An Mcs As Described In Section 4.2.3. As Well As The Following Knowledge And Skills: Ability To Provide Clear Leadership, Technical Direction, And Guidance To All Lower-level Acquisition Personnel. Possess Excellent Time Management And Writing Skills. Ability To Collaborate With Customers And Stakeholders On Performance Requirements Among Multiple Sites And Service Lines To Obtain Agreement, Standardize Enterprise Equipment, Supply And/or Service Requirements In Support Of Strategic Acquisition Plans. Ability To Refine And Improve Source Selection Evaluation Criteria. Ability To Make Suggestions By Analyzing Difficult Contracting Issues And Identifying Alternative Courses Of Action To Satisfy Specialized Requirements And Solve A Variety Of Contracting Problems. Ability To Conducting Gap Analyses And Understanding Of Cost Elements Which Go Into The Production, Management Or Delivery Of A Healthcare Resource Service Or Product. Ability To Provide Advisory Support And Prepare Procurement Packages For Review In Accordance With Customer Requirements And In Compliance With Va Policy And Procedures, To Include Federal And State Laws And Regulations. General It Systems And Applications: The Following It Systems And Applications Are Utilized For These Positions. All Candidates Must Have A Working Knowledge Of These Systems And Websites: Ms Teams, Word, Excel, Outlook, Powerpoint, Internet Explorer, And Edge Sharepoint Adobe Acrobat Google Chrome Government Contract Writing Systems System For Award Management (sam.gov) Contractor Performance Assessment Reporting System (cpars) Fpds-ng (federal Procurement Data System) Gsa Ebuy/gsa Advantage! Small Business Administration (sba.gov) English Language Requirement: The Contractor Shall Ensure All Personnel Performing Under This Contract Are Able To Read, Write, And Speak English Fluently. All Personnel Must Have The Ability To Effectively Communicate Orally Via Telephone And Ms Teams Communications As Well As Via Email Communications. U.s. Citizenship: All Contractor Personnel Performing Under This Contract Shall Be U.s. Citizens. Physical Requirements: Position Is Primarily Sedentary, Working While Seated And/or Standing. Period Of Performance, Place Of Performance And Hours Term Of Contract This Contract Has A Single Five-year Ordering Period, With Five One-year Pricing Periods. The Nco/pcac Contracting Office Will Issue The Task Orders. Each Task Order (to) Shall Specify The Hours And Period Of Performance. Pricing Period Dates Pricing Period 1 May 28, 2025 May 27, 2026 Pricing Period 2 May 28, 2026 May 27, 2027 Pricing Period 3 May 28, 2027 May 27, 2028 Pricing Period 4 May 28, 2028 May 27, 2029 Pricing Period 5 May 28, 2029 May 27, 2030 Place Of Performance Contractor Personnel May Be Required To Work On- Or Off-site (i.e., Government Office, Home Or The Contractor S Office); The Assigned Contractor Personnel Will Be Provided A Laptop And Personal Identity Verification (piv) Card. Specific Location To Be Identified In The Individual Task Order. Potential Locations Include Any Of The Following: Murfreesboro, Memphis, Johnson City, Tn; Lexington, Louisville, Ky; Ann Arbor, Battle Creek, Detroit, Mi; Cincinnati, Columbus, Kettering, Dayton, Cleveland/independence, Oh; Indianapolis, Marion, In; Milwaukee, Madison, Green Bay, Tomah, Wi; North Chicago, Marion, Il; Leavenworth, Wichita, Topeka, Ks; St. Louis, Poplar Bluff, Columbia, Mo; Houston, Tx; New Orleans, Alexandria, Shreveport, La; Biloxi, Jackson, Ms; Fayetteville, Little Rock, Ar; Florida Panhandle, Fl; St. Paul, St. Cloud, Mn; Coralville, Des Moines, Ia; Omaha, Ne; Fort Meade, Sioux Falls, Sd; Or Fargo, Nd. Travel To The Nearest Va Medical Center Is Required For On-boarding (fingerprinting, Piv Picture, Piv Card And Issuance Of Government Furnished Equipment (gfe)). Contractor Personnel Are Usually Required To Physically Access The Nearest Va Facility When Receiving Gfe. The Contractor S Services Are Expected To Be Needed For Six (6) Ncos: 9, 10, 12, 15, 16, And 23; And Pcac. The Location Area Of Each Nco Is Shown On Attachment D.2. Each Task Order Will Show The Number Of Hours And Estimated Number Of Personnel Needed For Each Location. Schedule Information And Tour Of Duty The Contractor Shall Provide The Minimum Number Of Personnel For Each Contracting Office To Meet The Number Of Hours Shown In The Schedule And To Ensure Continuity. The Number Of Hours And Personnel Shown In The Schedule Are Estimates Only. Task Order(s) Will Be Issued Based On The Number Of Hours (personnel) Needed For Each Nco, And Pcac Office. Please Note The Hourly Rate Submitted By The Contractor Must Be A Fully Burdened Rate, With A Single Hourly Rate For All Locations For Each Pricing Period. Tour Of Duty (work Hours): Each Cor And The Contractor S Representative Shall Work Together To Determine The Work Hours (tour Of Duty) Of Each Assigned Contractor Employee To Ensure A Consistent Schedule. Work Hours Will Adhere To The Local Time Zone Of The Nco Or Pcac Office In Which The Individual Contractor Personnel Supports. The Hours Of Operation Are Monday Through Friday 6:00 Am To 6:00 Pm With The Local Time Of Their Issuing Office, Excluding Federal Holidays. Full-time Contractor Personnel Shall Work 40 Hours Per Week (part-time Contractor Personnel Are Expected To Work At Least 20 Hours Per Week). A Normal Tour Of Duty For Full-time Contractor Personnel Is Eight (8) Hours Per Day With An Unpaid 30-minute Lunch (8.5 Hours), Five (5) Days Per Week, Monday Through Friday, Excluding Federal Holidays. The Tour Of Duty (work Hours) For Part-time Contractor Personnel Shall Be Coordinated Between The Cor And Contractor And Shall Be Within The Hours Of Operation. Variations To A 40-hour Work Week, Including Alternative Work Schedules, Require Advance Approval By The Co And Cor. Any Changes To The Tour Of Duty Must Be Submitted To The Cor Prior To Any Adjustment. Cors Are Responsible For Tracking Hours And May Require Contractor Employees To Send An Email Verification When Employee Shift Starts And Ends. The Day-to-day Supervision And Direct Control Over Contractor Personnel Will Be The Sole Responsibility Of The Contractor. Federal Holidays: The Following Holidays Are Observed By The Federal Government: New Year S Day (january 1) Birthday Of Martin Luther King, Jr. (third Monday In January) Washington S Birthday (third Monday In February) Memorial Day (last Monday In May) Juneteenth National Independence Day (june 19) Independence Day (july 4) Labor Day (first Monday In September) Columbus Day (second Monday In October) Veterans Day (november 11) Thanksgiving Day (fourth Thursday In November) Christmas Day (december 25) This List Shall Include Any Additional Day Specifically Declared By The President Of The United States To Be A Federal Holiday. **if A Holiday Falls On A Saturday, For Most Federal Employees, The Preceding Friday Will Be Treated As A Holiday For Pay And Leave Purposes. (see 5 U.s.c. 6103(b).) If A Holiday Falls On A Sunday, For Most Federal Employees, The Following Monday Will Be Treated As A Holiday For Pay And Leave Purposes. (see Section 3(a) Of Executive Order 11582, February 11, 1971.) ***contractor-employees Are Prohibited From Working On Any Federal Holiday. Planned/unplanned Absences: The Contractor Is Required To Notify The Cor Immediately For Sick/delay Absences From Work And At Least Two Days Prior To Vacation Or Other Absences From Work. Personnel May Use Vacation And Sick Time In Accordance With The Contractor S Policies, But The Contractor Shall Schedule Its Employees Vacation Time To Ensure That Employees Are Not Absent From Performance Availability For More Than Two (2) Consecutive Weeks At A Time.âthe Contractor Shall Ensure That No More Than One Of Their Assigned Personnel To A Specific Office Is Out Of The Office Simultaneously Unless The Absence Is Related To Inclement Weather, Illness, Or Other Unforeseen Events. Temporary Schedule Adjustments: Any Temporary Adjustments To A Contractor-employee S Work Schedule Must Be Requested In Advance And Approved By The Cor. For Example, A Temporary Schedule Adjustment Could Be To Work Longer On One Day In Exchange For A Shorter Workday Later In The Same Two-week Pay Period. Under No Circumstances Will A Contractor Work More Than 40 Hours In A Week Unless Authorized By The Cor; All Make Up Time Must Be Worked During Core Hours. Government Furnished Information, Property, And Equipment Government Furnished Equipment (gfe): The Government Shall Provide A Piv Card, A Laptop Computer And Software Applicable To Contract Personnel In Performance Of This Contract. Contractor Personnel May Be Required To Physically Access The Nearest Government Va Facility To Receive The Gfe. Contractor Personnel Shall Safeguard All Government Property, Documents, And Equipment. Government Personal Identification Verification Card (piv): Piv Cards Will Be Issued At The Start Of Contract Services For Security Access To Government Equipment And Sites. Contractor Shall Ensure All Government Furnished Equipment (gfe) And Piv Cards Are Returned To The Va (or Relevant Cor) Within Seven (7) Calendar Days When The Contract Ends Or When An Employee Leaves For Any Reason Prior To Contract End. Additional Gfe May Be Provided Depending On Circumstance And Equipment Availability. The Contractor Shall Furnish Any Other Required Equipment And Supplies As Necessary. Government Furnished Information (gfi): The Government May Provide All Applicable Policies, Guides, Standard Operating Procedures, Templates, Information, And Access To Va Networks And Sharepoint Necessary For Performance Under This Pws. The Va Retains Ownership Of All Government Furnished Equipment, Materials, Documents, And Information And Services Furnished Under This Contract. Other Costs Other Direct Costs (odc): The Cost Of General-purpose Items (notebooks, Paper, Pens, Calculators, Headsets, Folders, Tape, Staplers, Internet, Etc.) Required For The Conduct Of The Contractor S Normal Business Operations Will Not Be Considered An Allowable Odc In Performance Of This Contract. The Government Does Not Anticipate Odcs Not Already Accounted For As General-purpose Items Required Under This Contract. The Proposed Price Shall Include All Necessary Odcs. The Day-to-day Supervision And Direct Control Over The Work Performed By Contractor Personnel Shall Be The Sole Responsibility Of The Contractor. This Supervision Is Not A Separate Reimbursable Item Under This Requirement. Supervision Is An Overhead Cost That Is The Responsibility Of The Contractor. Performance Requirements And Summary Inherently Government Functions/non-personal Services: In Performance Of This Contract, The Contractor Shall Provide Services As Required By Contracting Activities Within The Rpo-c Area, To Support Va S Overall Mission. It Is Expressly Agreed And Understood That This Is A Non-personal Services Contract, As Defined In Federal Acquisition Regulation (far) 37.101, Under Which The Professional Services Rendered By The Contractor, Or Its Employees Are Rendered In Its Capacity As An Independent Contractor And Shall Not Be Considered Va Employees For Any Purpose Whatsoever. The Contract Acquisition Support Services Required On This Contract Constitute Professional And Management Services Within The Definition Provided By Far 37.201. This Contract Allows The Government To Obtain Professional Services Which Are Essential To The Va Mission, But Not Otherwise Available At This Time Within The Va. Contractor Personnel Shall Not Perform Inherently Governmental Functions (igf) As Defined In Federal Acquisition Regulation (far) Part 7.503(c)(12). All Contract Acquisition Support Services Shall Be Conducted In Accordance With The Far, Veterans Affairs Acquisition Regulation (vaar), Va Acquisition Manual (vaam), Procurement Policy Memorandums (ppms), Veterans Health Administration Procurement Manual (vhapm), Vha Procurement Guide (vhapg), Public Laws, Statutes, And Va Policies And Procedures. Tasks Executed By The Contractor Shall Be Considered Recommendations Subject To The Review And Approval By The Government. It Shall Be The Responsibility Of The Contractor To Manage Their Employees And Guard Against Any Actions That Are Personal Services In Nature. Professional Conduct And Performance: Contract Employees Shall Adhere To Professional Conduct Standards That Include Professional Courtesy, Punctuality, And Respect. Professional Conduct Includes Being Accessible During Duty Hours And Adhering To Each Contractor Employee S Work Schedule. The Respective Cor Shall Be Notified Of Any Schedule Changes Prior To The Contractor Employee S Absence Or Tardiness. Schedule Changes Shall Be Approved By The Cor Prior To Working. Should Any Contractor Employee Be Determined To Be Unacceptable In Terms Of Professional Conduct During Duty Hours, The Co And Contractor Poc Shall Be Notified By The Cor. If The Unacceptable Conduct Continues, The Contractor, Upon Direction From The Co, Shall Remove And Replace The Contractor Personnel Involved At No Additional Cost To The Government. All Contract Personnel Shall Sign A Contractor Rules Of Behavior (rob - Attachment D.4) Annually From Date Of Hire. Contractor Identification: Contractor Personnel Shall Clearly Identify Themselves As Contractors At All Times, In All Communications And Representations, To Avoid Situations Arising Where Sensitive Topics Might Be Better Discussed Solely Between Government Employees. Identification Shall Include When In The Workplace, In Meetings, In Conversations, Telecommunications, Mail, Electronic Mail (email), Faxes, With Government Personnel, Other Contractor Personnel And The Public. Answering Telephones: Contractor Personnel Must Identify Themselves As Contract Personnel In Telephone Conversations And Meetings Via Telephone, Or When Working In Situations Where Their Actions May Be Construed As Official Government Acts And/or Personnel. Telephone Script: Hello, This Is (name) With (contractor Name) In Support Of (nco Number, Or Pcac), How May I Help You? Utilizing Electronic Mail: When Prime Contractor Or Sub-contractor Personnel Send Email Messages As A Part Of Contract Performance (or Otherwise Relating To Contract Matters), Each Sender Shall Have A Signature Line That Includes: First Name And Last Name (contractor) Title Phone Number Email Address Individual S Employer Name Assigned Team Or Ordering Facility Non-disclosure And Conflict Of Interest Agreements: To Ensure The Integrity Of Government Contracting Operations, All Contractor Personnel Shall Execute A Non-disclosure Agreement (nda) During The On-boarding Process. All Contractor Personnel Will Have Ongoing Access To Proprietary Information Which They Are Required To Protect. All Information Is Considered Sensitive And Shall Not Be Disclosed Outside The Workplace. This Includes, But Is Not Limited To, Proprietary Data, Passwords, For Official Use Only Documents And Source Selection Information . All Contractor Personnel Assigned To And Performing On This Requirement May Not Work On Other Contracts For The Contractor, Or Other Agencies Without A Formal Written Request And Prior Written Consent. All Contract Personnel Shall Sign A Statement Of Non-disclosure (attachment D.3). Background Investigation: In Accordance With Homeland Security Presidential Directive-12 (hspd-12), Office Of Management And Budget Guidance M-05-24, And Federal Information Processing Standards Publication Number 201, A Criminal Background Check/investigation (bi) Is Required For All Contract Personnel To Determine Suitability For Routine Access To Government Facilities And Systems. Contract Personnel Must Receive A Favorable Adjudication After Investigation Paperwork. Additionally, All Contractor Personnel Must Start The Paperwork For A Background Investigation And Complete Finger Printing, As Well As Completion Of All Required Training Prior To The Start Of Placement Or Performance On The Contract. Va Mandatory Training Requirements: All Contractor Staff Must Log Onto Www.tms.va.gov, And Self-enroll. Information Security Awareness Training. Contractor Support Personnel Are Required To Complete Annual Information Security Awareness Training (during Onboarding And Annually Thereafter). Contractor Rules Of Behavior. Sign And Acknowledge Understanding Of And Responsibilities For Compliance With The Contractor Rules Of Behavior Relating To Access To Va Information (during On-boarding And Annually). Va Privacy Training. Complete Va Privacy Training (during Onboarding And Annually Thereafter). Government Contract Writing Training. Complete Any And All Required Training Applicable To Current Government Contract Writing Systems Such. If Previously Completed And Valid, The Contractor Shall Provide The Completion Certificate To The Cor And Co. Failure To Complete The Mandatory Training And Sign The Rules Of Behavior Annually, Within The Timeframe Required, Will Be Grounds For Suspension Or Termination Of All Physical Or Electronic Access Privileges And Removal From Work On The Contract Until Such Time As The Training And Documents Are Completed. The Nco/pcac Cors Will Be Responsible For Technical Monitoring Of The Contractor S Personnel Performance And Deliverables. The Cor And The Contractor S Representative Shall Work Together To Ensure All Contractual Requirements Are Being Met. The Cor Will Interpret Specifications Or Technical Portions Of The Work. Contractor Requirements And Responsibilities The Contractor Shall Provide Contractor Personnel, Expertise, Supervision Of Contractor Resources, And Any Required Deliverable Necessary To Satisfy The Requirements In This Pws. 9.1. Personnel Placement The Contractor Shall Provide A Sufficiently Detailed Resume Of Experience For Each Proposed Candidate To The Governments Contracting Officer Representatives (cor) For Approval And Verification Of Education And Experience Requirements. Responses To Submitted Resumes Will Normally Be Provided To The Contractor Within 7 Calendar Days. The Contractor Shall Pre-screen The Resumes To Ensure Each Proposed Candidate Has Met The Minimum Requirements Shown In Section 4 And To Ensure Each Resume Shows Specific And Detailed Experience (company Name, Dates Of Employment, Job Duties, Contract Types And Actions, Etc.). The Contractor Shall Effectively Fill And Assign Qualified Approved Contractor Personnel At Each Nco/pcac Office Within 40 Calendar Days Of Task Order Award. (this Does Not Include Va Onboarding Time.) The Contractor Shall Ensure All Required Information For Onboarding And All Background Investigation Paperwork Is Submitted Within 14 Calendar Days Of Cors Acceptance Of Contractor Personnel And Eqip Is Completed Within Six (6) Calendar Days Of Initiation. Va Staff Will Assist Contractor Personnel In Obtaining Personal Identity Verification (piv) Card And System Access To Va Networks. Personnel Maintenance And Gfe Turnover: The Contractor Shall Minimize The Effect And Impact To The Va By Strategically Managing Contractor Personnel Turnover To The Greatest Extent Possible Throughout The Life Of The Contract. Contractor Shall Ensure Continuation Of Services During Prolonged Personnel Absences Due To Sickness, Leave And Voluntary Or Involuntary Termination From Employment Such That Impact To The Government Is Minimal. Once A Contractor Is Aware That An Employee Is Leaving And Will No Longer Support A Task, The Contractor Shall Provide Written Documentation (email) To The Co And The Cor Within One (1) Business Days Of The Employee Advising The Contractor Of Their Intent To Leave. The Written Notification Shall Include The Date And Time The Position Will Be Vacant, The Anticipated Replacement Date, And What Management Action Will Be Taken To Ensure Task Completion. Any Position Vacancies Shall Not Exceed 14 Calendar Days (does Not Include Va Onboarding Time) Unless Directed Or Approved, In Writing, By The Co. Replacement/substitution: Any Change In Personnel Will Be Subject To Prior Government Approval. Prior To Replacing/substituting Personnel Performing On This Contract, The Contractor Shall Provide A Sufficiently Detailed Resume Of Proposed Contractor Personnel To The Cor For Verification And Approval Of Education And Experience Requirements. Responses To Submitted Resumes Will Be Provided To The Contractor Within Seven (7) Calendar Days. The Co/cor Reserves The Right To Refuse A Replacement/substitution If The Co/cor Deems The Replacement/substitution Does Not Meet The Qualifications. Government Equipment And Badges: Contractor Shall Ensure All Government Furnished Equipment (gfe) And Piv Cards Are Returned To The Va (or Relevant Cor) Within Seven (7) Calendar Days When The Contract Or Task Order Ends Or When An Employee Leaves For Any Reason Prior To Contract Or Task Order Expiration. The Contractor Shall Be Financially Responsible For Any Gfe That Is Lost, Stolen, Damaged, Or Not Returned To The Va Within Seven (7) Calendar Days Of Contract Or Task Order Expiration Or After A Contractor Employee Has Vacated Their Position. The Contractor Shall Report Any Lost Items (gfe, Piv) Immediately To The Co And Cor. Supervisory Controls: The Contractor Shall Be Responsible For Managing And Overseeing All Actions To Ensure Timely And Practical Support Performed Under This Contract. The Day-to-day Supervision And Direct Control Over The Work Performed By Off-site Or Remote Contractor Personnel Will Be The Sole Responsibility Of The Contractor. The Government Will Not Supervise Contractor Personnel, Prepare Contractor Personnel Work Schedules, Or Control The Method By Which The Contractor Personnel Perform The Required Tasks. The Government Will Only Provide Tasks To Contractor Personnel For Execution. The Contractor Personnel Will Work Independently And Keep The Relevant Co And/or Cor Informed Of All Actions Assigned. All Assignments Will Be Completed In A Timely Fashion. Work Will Be Reviewed By The Relevant Co And/or Cor For Compliance With Va Policies, Far And Vaar Regulations, Overall Objectives, And Effectiveness In Achieving Results. Quality Assurance (qa) / Acceptance Quality Limit (aql): The Government Reserves The Right To Survey All Services Received Under This Contract To Determine Whether The Contractor Is Meeting Performance Standards, Service Levels, And Objectives. The Government Has The Right To Change Or Modify Inspection Methods At Its Discretion. Quality Control: Contractor Shall Develop And Maintain Its Own Quality Control Program / Inspection Plan That Assures Compliance With All Requirements Of This Contract. Acceptance Quality Level: As A Minimum, The Contractor S Plan Should Address These Items Shown Below For The Acceptance Quality Level (aql) During The Contract S Performance Period. Standards Basis Aql Contractor Personnel Placement With Onboarding And Background Investigation Documents Reference Pws Paragraphs 4., 6., 8.4., 8.5., 8.6., And 9.1. Positions Filled With Approved And Qualified Personnel Within 40 Calendar Days Of Task Order Award And Onboarding Documents Submitted / Completed Within 14 Calendar Days. 95% Coordination And Placement Of Qualified Personnel. No More Than One (1) Instance Of An Initial Vacancy Not Filled Within 40 Days Of Task Order Award. No More Than Two (2) Instances Where Onboarding Documents Were Not Submitted/completed Within 7 Calendar Days. Effective Replacement / Substitute Personnel Reference Pws Paragraphs 4., 5.3.5., 6., 8.4., 8.5., 8.6., 9.11., 9.1.2., 9.1.4., And 9.2. Vacancies Due To Turnover Filled With Approved And Qualified Personnel Within 14 Days Of Departure. Prior Coordination 100% Of The Time For Replacement Personnel. No More Than Three (3) Instances Of Failure To Fill Vacancies With Qualified Personnel Within 14 Days Of Vacancy Notification. Monthly Activity Report (mar) Reference Pws Paragraph 10.2. No More Than Two (2) Mars Submitted Late Annually. Quarterly Activity Report (qar) Reference Pws Paragraph 10.3. No More Than One (1) Qar Submitted Late Annually. Personnel List Reference Pws Paragraph 10.4. No More Than Three (3) Personnel Reports Submitted Late During The Life Of The Contract. Gfe And Piv Returned To The Va Within 7 Calendar Days. Reference Pws Paragraph 9.2.3. No More Than Two (2) Instances Reported During The Life Of The Contract. Timeliness Procurement Action Lead Time (palt), Contractor Deliverables (contractor Personnel) Based On Current Va Policy. 90% Customer Service Reference Pws Paragraph 8. Feedback From Stakeholders On Contractor Personnel. No More Than 3 Significant And Substantiated Complaints. 90% Quality Of Contractual Documentation Contracting Officer And Cor Reviews Of Submitted And Completed Documents. 90% Productivity Number Of Actions Completed As A Function Of Complexity 90% Contracting Officer S Representative (cor): The Government Will Identify And Delegate A Cor For Each Participating Office (nco/pcac). The Cor Shall Monitor All Technical Aspects Of The Contract And Assist In Contract Administration. Unless Otherwise Identified In A Delegation Letter, The Cor Is Authorized To Perform The Following Functions: Assure That The Contractor Performs The Technical And Administrative Requirements Of The Contract; Perform Necessary Inspections In Connection With Contract Performance; Maintain Written And Oral Communications With The Contractor Concerning Technical Aspects Of The Contract; Issue Written Interpretations Of Technical Requirements; Monitor The Contractor's Performance And Notify Both The Co And Contractor Of Any Deficiencies; Oversee The Distribution Of Government Furnished Property; Coordination Of Required Security/background Documentation; And, Provide Facility Access Of Contractor Personnel Through Arranging Scheduling And Piv Card Pick Up. The Co Will Send A Letter Of Delegation To The Cor And The Contractor, Which States The Specific Responsibilities And Limitations Of The Cor. The Cor Is Not Authorized To Change Any Of The Terms And Conditions Of The Contract. Cors Are Not Authorized To Obligate Funds Or Execute Any Contract Modifications. Cors Will Be Responsible For Reviewing, Approving, And Certifying Invoices For Their Respective Location. Cor Reviews: The Cor Will Interpret Specifications Or Technical Portions Of The Work. All Performance Concerns Shall Be Addressed Between The Cor, Co, And Contractor. The Cor And The Contractor S Representative Shall Work Together To Ensure All Contractual Requirements Are Being Met. Contractor Deliverables Contractor Point Of Contact: The Contractor Shall Provide A Point Of Contact (poc) / Supervisor Who Shall Be Responsible For The Performance Of Work From The Contract Acquisition Support Specialists. The Contractor Shall Designate This Individual, In Writing, To The Co And Cors Before The Start Of Performance. An Alternate Poc May Be Designated, But The Contractor Shall Identify Those Times When The Alternate Shall Be The Primary Poc. The Contractor Poc Shall Be Available Via Telephone And Email, Monday Through Friday, 8:00 A.m. Until 4:30 P.m. Central Time (ct) Excluding Federal Holidays. The Poc Shall Have Authority To Direct Contract Employees On The Contract Or Have Direct Contact With The Manager/supervisor For The Contract Support Employees. Monthly Activity Report Deliverable: The Contractor Shall Submit A Monthly Activity Report (mar) To Each Cor, On Or Before The 15th Day Of The Following Month. Contractor Shall Develop And Submit Monthly Activity Reports (mars) To The Cor And Administering Co For Review At Any Monthly/quarterly Meetings. The Mars Shall Include A Summary Of Activities For The Month, Issues, And Goals For The Next Month. The Mars Shall Summarize The Contractor S Accomplishments During The Previous Month, Planned Work During The Upcoming Month And Any Significant Problems Or Issues Requiring Resolution, Along With Proposed Corrective Actions. The Contractor Shall Deliver These Reports To All Appropriate Parties Identified In This Section. The Mar Shall Include, At A Minimum, The Following Information: Contract Number Task Order Number Reporting Period Number Of Hours Each Employee Worked Brief Task Description For Each Employee For Each Employee: A Narrative Review Of Work Accomplished During The Reporting Period And Significant Events Personnel Actions For The Period (separations, Labor Category Changes, Recruitments) Quarterly Report Deliverable: The Contractor Shall Submit A Quarterly Activity Report (qar) To The Co On Or Before The 15th Day Following Each Quarter, Summarizing, At A Minimum: The Contract Number The List Of Contractor Employees Including Location The Number And Location Of Any Open/unfilled Positions The Number Of Calendar Days It Takes/took To Fill Each Open Position. List Of Contractor Employees: The Contractor Shall Maintain A Current List Of Employees Assigned Under This Contract And Their Assigned Nco/pcac Location. The List Shall Be Validated And Signed By The Contractor And Provided To The Co Once All Employees Are Assigned. An Updated List Shall Be Provided Upon Any Changes (additions/deletions). Once A Contractor Is Aware That An Employee Is Leaving, Or Termination Of Employment The Contractor Shall Provide Written Documentation To The Cor Within One (1) Business Day. The Written Notification Shall Include The Date And Time The Position Will Be Vacant, And Anticipated Replacement Date. Organizational Conflicts Of Interest (oci): The Contractor Shall Have An Oci Plan In Place For Detecting, Disclosing, Avoiding, And Mitigating Oci Issues/risks Involved In The Performance Of This Contract. An Oci Exists When A Contractor Employee Participates Personally And Substantially In A Particular Matter (e.g., A Contract) That Would Have A Direct And Predictable Effect On The Contractor Employee S Own Financial Interest Or The Financial Interest Of The Contractor Employee S Spouse, Minor Child, General Partner, Any Person Or Entity Whom The Contractor Employee Serves As An Officer, Director, Trustee Or Employee, Or Any Person With Whom The Contractor Employee Is Negotiating Or Has An Arrangement For Prospective Employment. The Oci Will Include The Contractor And All Assigned Contractor Employees On This Contract And Associated Family Members. The Plan Shall Identify Any Potential Conflicts Of Interest And Shall Provide A Process For Dealing With Any Oci That Is Identified During Contract Execution. The Oci Plan Shall Disclose All Cross-teaming Arrangements And Shall Include A Representation That There Will Be No Crosstalk , Or Information Shared Between The Two Affiliates Regarding The Contract. The Contractor Shall Notify The Co Within Two Business Days Of Any Oci Violations On This Contract. Non-disclosure Agreements: All Contractor Personnel Assigned To Work On This Contract Shall Be Required To Sign A Non-disclosure Agreement (nda) During Their Onboarding Regarding Key Aspects Of The Project And Project Content. All Information Is Considered Sensitive And Will Not Be Disclosed Outside The Workplace. This Includes Proprietary Data, Passwords, For Official Use Only Documents And Source Selection Information. Background Investigation: A Criminal Background Check Is Required For All Contract Personnel. Contract Personnel Must Receive A Favorable Adjudication After Investigation Paperwork. All Contractor Personnel Must Complete Finger Printing And Start Background Investigation Paperwork Prior To Placement On The Contract. Invoices Each Nco/pcac Location Will Be Assigned A Cor Who Shall Serve As The Governments Primary Point Of Contact (poc) For That Location. Inspection And Acceptance Of Services Is Delegated To The Corresponding Cor. The Contractor Shall Submit A Separate Monthly Itemized Invoice To Each Cor In Arrears For Services Performed. The Invoice Shall Contain Contractor S Name, Address, Point Of Contact, Invoice Number, Contract Number, Task Order Number, And Purchase Order (po) Number Along With A Listing Of Each Contractor Employee S Name, Dates Worked, Actual Number Of Hours Worked, Work Location (nco/pcac), The Agreed Upon Fixed Hourly Rate And Total Price. Reduction In Services: Each Task Order Issued Under This Contract Will Be For A Specific Number Of Hours. If, At The End Of The Task Order Period Of Performance, The Government Has Not Utilized The Total Number Of Hours Ordered Because Of A Change In Its Anticipated Needs Or Delays That Are Due To Recruiting, Hiring, Onboarding, Turnover And Finding Replacements, The Contractor Agrees To Enter Into A Good Faith Negotiation To Bilaterally Reduce The Scope Of The Task Order With A Corresponding Adjustment In The Total Task Order Price. In No Event Will The Government Pay The Contractor For Hours Not Actually Worked. Vha Onboarding / Offboarding Process The Contractor Shall Provide Onboarding/offboarding Liaising And A Liaising Tracker For Onboarding And Offboarding Contractor Personnel. The Liaising Tracker Shall Be Updated Within A Day Of Onboarding/offboarding Action. The Contractor Shall Collect All The Required Documents For Onboarding Personnel, Perform Preliminary Review Of All Documents To Ensure The Forms Are Completed Accurately, And Submit All Forms To The Cor To Initiate The Background Investigation For All New Hires. All Forms And Supporting Documents Shall Be In .pdf Format And Use The Naming Convention Shown In The Example Below For Each File: The Following Onboarding Forms Shall Be Completed And Submitted To The Cor Within A Week Of Identifying (cor Approval) The Contract Personnel: Declaration For Federal Employment (of 306) Background Investigation Request (fm 1a) Contractor / Employee Piv Office Fingerprint Request Form (fm 2) Self-certification Of Continuous Service (sc) Non-disclosure Agreement (nda) Tms Training Certificates For Va Privacy And Information Security Awareness And Rules Of Behavior Certificate (valid For Only One Year) Tms Training Certificates For Privacy And Hipaa Training Certificate (valid For Only One Year) The Following Tasks Are Required By The Contractor When Onboarding Contractor Personnel: Schedule New Hires For Fingerprints At The Nearest Va Facility From The Contractor-employee S Physical Location Ensure All Onboarding Forms Are Completed Properly Submit All Onboarding Forms To The Cor In A Password Protected Email For The Initial Background Investigation And Send Password To Cor In A Separate Email Ensure All Contractor Personnel Working On This Contract Have Been Favorably Adjudicated Advise The Cor If Contractor-employee Is Transferring From Another Va Facility/department Request Contractor-employee Tms Access From Cor Coordinate With The Cor Regarding Wmc-hroo Persec Contractor Onboarding Process. Verify The Last 5 Years Of Related Work Experience On Candidates Resume The Following Tasks Are Required By The Contractor When Offboarding Contractor Personnel: When The Contractor Is Made Aware Of A Departure Of A Contract-employee, The Contractor Must Notify The Cor And Co Within One (1) Business Day. Complete The Offboarding Form For Each Contractor Employee. On The Final Day Of The Contractor Employee Day Of Employment The Employee Will Turn In All Government Issued Equipment, Piv Card And Any Subsequent Reports And Incomplete Tasks. Security Issues And Access General: Department Of Veterans Affairs Medical Centers Are Federal Government Facilities. Prior To Contractor Personnel Start Day, A Personnel Background Investigation (bi) Shall Be Completed And Sent To The Contracting Officer And Respective Cor. The Piv Card Will Not Be Issued Until The Background Checks Are Completed And Approved By The Security Investigation Center (sic). Security Identification Badges: Contract Employees Shall Comply With Their Assigned Location S Identification And Access Requirements. The Contractor Is Responsible For Absences Of Contract Employees Due To Expired Or Lost Identification And Access Documents. Contractor/contract Employees Shall Turn In All Identification Badges To The Contracting Officer, Or Designated Representative Upon Termination Of Their Services Under The Contract. The Contractor Shall Be Responsible For The Replacement Cost Of Lost Or Non-returned Piv Cards. Subject To Criminal Penalties; Equipment And Piv Badges (need To Run By Ogc) Security: All Contractors And Contractor Personnel Shall Be Subject To The Same Federal Security And Privacy Laws, Regulations, Standards, And Va Policies, Including The Privacy Act, 5 U.s.c. 552a, And Va Personnel, Regarding Information And Information System Security. Contractors Shall Follow Policies And Procedures Outlined In Va Directive 6500, Information Security Program Which Is Available At: Http://www.va.gov/vapubs/ And Its Handbooks To Ensure Appropriate Security Controls Are In Place. All Contractor Personnel Requiring Access To Va Computer Networks Are Required To Complete Va S Information Security And Privacy Awareness Training Annually. Confidentiality: Contractor Personnel Who Obtain Access To Hardware, Software, Or Media, Which May Manipulate Or Store Any Sensitive Information, That Is Protected Under 38 Usc 4132 Or 3305, As Defined By The Department Of Veterans Affairs, Must Not Access Information Unless Absolutely Necessary To Perform Their Contractual Duties. Disclosure Of Any Sensitive Data Obtained During Performance Of Assigned Duties Under This Contract Is Prohibited. Violation Of These Statutory Provisions May Involve Imposition Of Criminal Penalties. Contractor Is Considered To Be A Va Contractor For Purposes Of Privacy Act, Title 5 U.s.c. 552a. Hipaa: The Contractor Shall Abide By The Standards For Privacy Of Individually Identifiable Health Information Of The Health Insurance Portability And Accountability Act (hipaa), Public Law 104-01. The Contractor Shall Not Use Or Further Disclose Protected Health Information Other Than As Permitted Or Required By The Contract Or As Required By Law. The Contractor Shall Use Appropriate Safeguards To Prevent Use Or Disclosure Of The Protected Health Information. The Contractor Shall Mitigate, To The Extent Practicable, Any Harmful Effect That Is Known To The Contractor Of A Use Or Disclosure Of Protected Health Information By The Contractor In Violation Of The Requirements Of This Contract. The Contractor Shall Report To The Government Any Use Or Disclosure Of The Protected Health Information Not Provided For By This Contract. The Contractor Shall Document, In A Time And Manner Designated By The Government, Any Disclosure Of Protected Health Information As Would Be Required For The Government To Respond To A Request By An Individual For An Accounting Of Disclosure Of Protected Health Information. Removal Of Personnel At Government Request: The Government May Request Removal (permanent Or Temporary) Of Contract Personnel For Security, Safety, Or Health Reasons, Upon Discovery Of Fraudulent Resume Documentation, Or When Contractor Personnel Behave In An Unprofessional Manner That Would Be Considered Unacceptable By A Reasonable Person. The Government May Also Request Removal If It Is Determined That There Is No Available Work To Assign Them. Removals Shall Be Effective By Close Of Business On The Same Day As Notification, Unless Otherwise Determined By The Government. Prior To Replacing/substituting Personnel Under These Circumstances (reference Sections 4, 5.3.5., 9.1., And 9.2.) The Contractor Shall Provide A Sufficiently Detailed Qualification Summary/resume Of Proposed Personnel For Government Coordination. End Of Pws
Closing Date14 Feb 2025
Tender AmountRefer Documents
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Healthcare and Medicine
United States
Details: Combined Synopsis/solicitation Notice
combined Synopsis/solicitation Notice
page 3 Of 53
combined Synopsis/solicitation Notice
*= Required Field
combined Synopsis/solicitation Notice
page 1 Of 53
description
page 4 Of 53
page 4 Of 53
this Is A Combined Synopsis/solicitation For Commercial Products And Commercial Services Prepared In Accordance With The Format In Federal Acquisition Regulation (far) Subpart 12.6, Streamlined Procedures For Evaluation And Solicitation For Commercial Products And Commercial Services, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested, And A Written Solicitation Document Will Not Be Issued.
this Solicitation Is Issued As An Rfq. The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2025-03, January 03, 2025.
this Solicitation Is Set-aside For Service-disabled Veteran-owned Small Business (sdvosb)
the Associated North American Industrial Classification System (naics) Code For This Procurement Is 332812, With A Small Business Size Standard Of 600 Employees. The Fsc/psc Is J066.
the Va Brockton Healthcare System Sterile Processing Services (sps) Is Seeking To Purchase The Supplies And Services Described Below Brand Name Or Equal.
the Contract Period Of Performance Is 02/10/2025 02/09/2026.
place Of Performance/place Of Delivery:
940 Belmont St
brockton, Ma 02301-5596
the Full Text Of Far Provisions Or Clauses May Be Accessed Electronically At Http://acquisition.gov/comp/far/index.html.
the Following Solicitation Provisions Apply To This Acquisition:
far 52.212-1, Instructions To Offerors Commercial Items
far 52.212-3, Offerors Representations And Certifications Commercial Items
offerors Must Complete Annual Representations And Certifications Electronically Via The System For Award Management (sam) Website Located At Https://www.sam.gov/portal In Accordance With Far 52.212-3, Offerors Representations And Certifications Commercial Items. If Paragraph (j) Of The Provision Is Applicable, A Written Submission Is Required.
This Contract Incorporates One Or More Clauses By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. Also, The Full Text Of A Clause May Be Accessed Electronically At This/these Address(es):
Https://www.acquisition.gov/browse/index/far
Https://www.va.gov/oal/library/vaar/
(end Of Clause)
the Following Contract Clauses Apply To This Acquisition:
far 52.212-4, Contract Terms And Conditions Commercial Items Nov 2023
(a) The Contractor Shall Comply With The Following Federal Acquisition Regulation (far) Clauses, Which Are Incorporated In This Contract By Reference, To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services:
(1) 52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)).
(2) 52.204 23, Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities (dec 2023) (section 1634 Of Pub. L. 115 91).
(3) 52.204 25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (nov 2021) (section 889(a)(1)(a) Of Pub. L. 115 232).
(4) 52.209-10, Prohibition On Contracting With Inverted Domestic Corporations (nov 2015).
(5) 52.232 40, Providing Accelerated Payments To Small Business Subcontractors (mar 2023) (31 U.s.c. 3903 And 10 U.s.c. 3801).
(6) 52.233-3, Protest After Award (aug 1996) (31 U.s.c. 3553).
(7) 52.233-4, Applicable Law For Breach Of Contract Claim (oct 2004) (public Laws 108-77 And 108-78 (19 U.s.c. 3805 Note)).
(b) The Contractor Shall Comply With The Far Clauses In This Paragraph (b) That The Contracting Officer Has Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services:
the Following Subparagraphs Of Far 52.212-5 Are Applicable:
52.203 17, 52.204-10, 52.204 14, 52.204 27, 52.204 30, 52.209 6, 52.219 27, 52.219-28, 52.222-19, 52.222-21, 52.222-26, 52.222 36, 52.222 37, 52.222-50, 52.222 54, 52.226-8, 52.232-33, 52.222-51,
gray Market Items (apr 2020)
(a) No Gray Market Or Remanufactured Items Will Be Acceptable. Gray Market Items Are Original Equipment Manufacturers (oem) Goods Sold Through Unauthorized Channels In Direct Competition With Authorized Distributors. This Procurement Is For New Oem Medical Equipment Only For Va Medical Facilities.
(b) Vendor Shall Be An Oem, Authorized Dealer, Authorized Distributor, Or Authorized Reseller For The Proposed Equipment/system, Verified By An Authorization Letter Or Other Documents From The Oem. All Software Licensing, Warranty And Service Associated With The Equipment/system Shall Be In Accordance With The Oem Terms And Conditions.
(end Of Clause)
all Quoters Shall Submit The Following: Quote, Authorized Distributor Letter.
all Quotes Shall Be Sent To The Contract Specialist: Frederic.revah1@va.gov
award Will Be Based Upon A Comparative Evaluation Of Quotes In Accordance With The Simplified Acquisition Procedures Of Far 13.
comparative Evaluation Is The Side By Side Pairwise Comparison Of Quotes Based On Factors Resulting In A Contracting Officer Decision For The Quote Which Provides The Most Benefit To The Government.
the Following Are The Decision Factors:
price
technical Review
the Award Will Be Made To The Response Most Advantageous To The Government.
responses Should Contain Your Best Terms, Conditions.
to Facilitate The Award Process, All Quotes Must Include A Statement Regarding The Terms And Conditions Herein As Follows:
"the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document Without Modification, Deletion, Or Addition."
or
"the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document With The Exception, Deletion, Or Addition Of The Following:"
Quoters Shall List Exception(s) And Rationale For The Exception(s), If Any.
submission Of Your Response Shall Be Received Not Later Than 6:00am Est On 01/20/2025 At Frederic.revah1@va.gov
late Submissions Shall Be Treated In Accordance With The Solicitation Provision At Far 52.212-1(f).
any Questions Or Concerns Regarding This Solicitation Should Be Forwarded In Writing Via E-mail To The Point Of Contact
page 1 Of 52
page 1 Of
page 7 Of 53
page 7 Of 53
page 1 Of
page 1 Of
a.3 Price/cost Schedule
item Information
item Number
description Of Supplies/services
quantity
unit
unit Price
amount
0001
1.00
ea
__________________
__________________
nutrace Nux-20 Ng Laser Unit. Computer/laptop With Windows 10 And Supporting Accessories, Fumex Fume/odor Extractor Equipment. Fa1-mnutrace Select & Mark Templates. Different Laser Configurations For Different Instrument Materials Included Gs1 Codes. Safety Glasses To Operate The Laser In Class 4 Mode, Electropolishing Unit With Proprietary Solution Rater
contract Period: Base
pop Begin: 02-10-2025
pop End: 02-09-2026
principal Naics Code: 332812 - Metal Coating, Engraving (except Jewelry And Silverware), And Allied Services To Manufacturers
product/service Code: J066 - Maintenance, Repair, And Rebuilding Of Equipment - Instruments And Laboratory Equipment
local Stock Number: Nux20 Ng
0002
10.00
ea
__________________
__________________
scanner R+ Healthcare Can Read A 2d Data Matrix In < 0.5 Seconds Per Instrument, Irrelevant Of Instrument Contrast, Instrument Material Or Position Of The Code. A Good Geometrical Data Matrix, R+ Will Read It. With A More Powerful Camera And Led Lighting Technology, The R+ Max Can Read 2d Matrix As Small As .010 X.010mm (4mils). Stainless Steel Body
contract Period: Base
pop Begin: 02-10-2025
pop End: 02-09-2026
principal Naics Code: 332812 - Metal Coating, Engraving (except Jewelry And Silverware), And Allied Services To Manufacturers
product/service Code: J066 - Maintenance, Repair, And Rebuilding Of Equipment - Instruments And Laboratory Equipment
local Stock Number: Nu Trace R+scan
0003
1.00
ea
__________________
__________________
laser Etching - Up To 9500 Instruments At 800 Instruments Per Day Minimum - Udi Applicationsurgical Instruments Will Be Marked With A Unique Device Identifier On Most Instruments Including Stainless Steel, Anodized Aluminum, Titanium, And Plastics Data
contract Period: Base
pop Begin: 02-10-2025
pop End: 02-09-2026
principal Naics Code: 332812 - Metal Coating, Engraving (except Jewelry And Silverware), And Allied Services To Manufacturers
product/service Code: J066 - Maintenance, Repair, And Rebuilding Of Equipment - Instruments And Laboratory Equipment
local Stock Number: Laser Etching
0004
1.00
ea
__________________
__________________
lia (laser Institute Of America).two Certification, Up To 32 Hours Of Training On-line And On-site Including: Sample Tray Of Surgical Instruments Will Be Marked With Unique Device Identifier On Most Instruments Including Stainless Steel, Anodized Aluminum, Titanium, And Plastics Data
contract Period: Base
pop Begin: 02-10-2025
pop End: 02-09-2026
principal Naics Code: 332812 - Metal Coating, Engraving (except Jewelry And Silverware), And Allied Services To Manufacturers
product/service Code: J066 - Maintenance, Repair, And Rebuilding Of Equipment - Instruments And Laboratory Equipment
local Stock Number: Laser Start Up
0005
1.00
ea
__________________
__________________
service Contract For 1 Year - Includes Pm Repairs, Any Mechanical Repairs, 2 On Location Specialists For 3 Days Per Year And Any Shipping Costs/use Of A Loaner.
contract Period: Base
pop Begin: 02-10-2025
pop End: 02-09-2026
principal Naics Code: 332812 - Metal Coating, Engraving (except Jewelry And Silverware), And Allied Services To Manufacturers
product/service Code: J066 - Maintenance, Repair, And Rebuilding Of Equipment - Instruments And Laboratory Equipment
local Stock Number: Pm
grand Total
__________________
a.4 Delivery Schedule
item Number
shipping Information
quantity
delivery Date
0001
ship To:
department Of Veterans Affairs
brockton Va Medical Center
940 Belmont Street
brockton, Ma 02301 5596
usa
1.00
02/09/2026
mark For:
michelle Stgermain
857-203-6078
michaelle.stgermain@va.gov
fob:
destination
0002
10.00
fob:
destination
0003
1.00
fob:
destination
0004
1.00
fob:
destination
0005
1.00
fob:
destination
36c24125q0191
page 1 Of
page 1 Of
page 26 Of 53
page 26 Of 53
page 1 Of
page 1 Of
section C - Contract Clauses
c.2 Vaar 852.219-73 Va Notice Of Total Set-aside For Certified Service-disabled Veteran-owned Small Businesses (jan 2023) (deviation)
(a) Definition. For The Department Of Veterans Affairs, Service-disabled Veteran-owned Small Business Concern Or Sdvosb :
(1) Means A Small Business Concern
(i) Not Less Than 51 Percent Of Which Is Owned By One Or More Service-disabled Veterans Or, In The Case Of Any Publicly Owned Business, Not Less Than 51 Percent Of The Stock Of Which Is Owned By One Or More Service-disabled Veterans Or Eligible Surviving Spouses (see Vaar 802.201, Surviving Spouse Definition);
(ii) The Management And Daily Business Operations Of Which Are Controlled By One Or More Service-disabled Veterans (or Eligible Surviving Spouses) Or, In The Case Of A Service-disabled Veteran With Permanent And Severe Disability, The Spouse Or Permanent Caregiver Of Such Veteran;
(iii) The Business Meets Federal Small Business Size Standards For The Applicable North American Industry Classification System (naics) Code Identified In The Solicitation Document;
(iv) The Business Has Been Certified For Ownership And Control Pursuant To 38 U.s.c. 8127, 13 Cfr 128, And Is Listed As Certified In The Sba Certification Database At Https://veterans.certify.sba.gov/; And
(v) The Business Agrees To Comply With Vaar Subpart 819.70 And Small Business Administration (sba) Regulations Regarding Small Business Size, Government Contracting, And The Veteran Small Business Certification Program At 13 Cfr Parts 121, 125, And 128.
(2) The Term Service-disabled Veteran Means A Veteran, As Defined In 38 U.s.c. 101(2), With A Disability That Is Service-connected, As Defined In 38 U.s.c. 101(16).
(3) The Term Small Business Concern Has The Meaning Given That Term Under Section 3 Of The Small Business Act (15 U.s.c. 632).
(4) The Term Small Business Concern Owned And Controlled By Veterans With Service-connected Disabilities Has The Meaning Given The Term Small Business Concern Owned And Controlled By Service-disabled Veterans Under Section 3(q)(2) Of The Small Business Act (15 U.s.c. 632(q)(2)).
(5) The Term Sdvosb Participant Or Certified Sdvosb Means A Small Business That Has Been Certified In The Sba Veteran Small Business Certification Program And Listed In The Sba Certification Database (see 13 Cfr 128.102).
(b) General. In Order For A Concern To Submit An Offer And Be Eligible For The Award Of An Sdvosb Set-aside Or Sole Source Contract, The Concern Must Qualify As A Small Business Concern Under The Size Standard Corresponding To The Naics Code Assigned To The Contract And Be Listed As An Sdvosb Participant In The Sba Certification Database As Set Forth In 13 Cfr 128.
(1) Offers Received From Entities That Are Not Certified Sdvosbs And Listed In The Sba Certification Database At The Time Of Offer Shall Not Be Considered.
(2) Any Award Resulting From This Solicitation Shall Be Made To A Certified Sdvosb Listed In The Sba Certification Database Who Is Eligible At The Time Of Submission Of Offer(s) And At The Time Of Award.
(3) The Requirements In This Clause Apply To Any Contract, Order Or Subcontract Where The Firm Receives A Benefit Or Preference From Its Designation As An Sdvosb, Including Set-asides, Sole Source Awards, And Evaluation Preferences.
(c) Representation. Pursuant To 38 U.s.c. 8127(e), Only Certified Sdvosbs Listed In The Sba Certification Database Are Considered Eligible To Receive Award Of A Resulting Contract. By Submitting An Offer, The Prospective Contractor Represents That It Is An Eligible And Certified Sdvosb As Defined In This Clause, 13 Cfr 121, 125, And 128, And Vaar Subpart 819.70.
(d) Agreement/los Certification. When Awarded A Contract Action, Including Orders Under Multipleaward Contracts, An Sdvosb Agrees That In The Performance Of The Contract, The Sdvosb Shall Comply With Requirements In Vaar Subpart 819.70 And Sba Regulations On Small Business Size, And Government Contracting Programs At 13 Cfr Part 121 And Part 125, Including The Non-manufacturer Rule And Limitations On Subcontracting (los) Requirements In 13 Cfr 121.406(b) And 13 Cfr 125.6. For The Purpose Of Limitations On Subcontracting, Only Certified Sdvosbs Listed In The Sba Certification Database (including Independent Contractors) Shall Be Considered Eligible And/or Similarly Situated (i.e., A Firm That Has The Same Small Business Program Status As The Prime Contractor). An Otherwise Eligible Firm Further Agrees To Comply With The Required Los Certification Requirements In This Solicitation (see 852.219 75 Or 852.219 76 As Applicable). These Requirements Are Summarized As Follows:
(1) Services. In The Case Of A Contract For Services (except Construction), The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance To Firms That Are Not Certified Sdvosbs Listed In The Sba Certification Database (excluding Direct Costs To The Extent They Are Not The Principal Purpose Of The Acquisition And The Sdvosb/ Vosb Does Not Provide The Service, Such As Airline Travel, Cloud Computing Services, Or Mass Media Purchases). When A Contract Includes Both Services And Supplies, The 50 Percent Limitation Shall Apply Only To The Service Portion Of The Contract.
(2) Supplies/products.
(i) In The Case Of A Contract For Supplies Or Products (other Than From A Non-manufacturer Of Such Supplies), The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, To Firms That Are Not Certified Sdvosbs Listed In The Sba Certification Database. When A Contract Includes Both Supply And Services, The 50 Percent Limitation Shall Apply Only To The Supply Portion Of The Contract.
(ii) In The Case Of A Contract For Supplies From A Non-manufacturer, The Sdvosb Prime Contractor Will Supply The Product Of A Domestic Small Business Manufacturer Or Processor, Unless A Waiver As Described In 13 Cfr 121.406(b)(5) Has Been Granted. Refer To 13 Cfr 125.6(a)(2)(ii) For Guidance Pertaining To Multiple Item Procurements.
(3) General Construction. In The Case Of A Contract For General Construction, The Sdvosb Prime Contractor Will Not Pay More Than 85% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, To Firms That Are Not Certified Sdvosbs Listed In The Sba Certification Database.
(4) Special Trade Construction Contractors. In The Case Of A Contract For Special Trade Contractors, No More Than 75% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, May Be Paid To Firms That Are Not Certified Sdvosbs Listed In The Sba Certification Database.
(5) Subcontracting. An Sdvosb Subcontractor Must Meet The Naics Size Standard Assigned By The Prime Contractor And Be Certified And Listed In The Sba Certification Database To Count As Similarly Situated. Any Work That A First Tier Sdvosb Subcontractor Further Subcontracts Will Count Towards The Percent Of Subcontract Amount That Cannot Be Exceeded. For Supply Or Construction Contracts, The Cost Of Materials Is Excluded And Not Considered To Be Subcontracted. When A Contract Includes Both Services And Supplies, The 50 Percent Limitation Shall Apply Only To The Portion Of The Contract With The Preponderance Of The Expenditure Upon Which The Assigned Naics Is Based. For Information And More Specific Requirements, Refer To 13 Cfr 125.6.
(e) Required Limitations On Subcontracting Compliance Measurement Period. An Sdvosb Shall Comply With The Limitations On Subcontracting As Follows:
[] By The End Of The Base Term Of The Contract Or Order, And Then By The End Of Each Subsequent Option Period; Or
[] By The End Of The Performance Period For Each Order Issued Under The Contract.
(f) Joint Ventures. A Joint Venture May Be Considered Eligible As An Sdvosb If The Joint Venture Complies With The Requirements In 13 Cfr 128.402 And The Managing Joint Venture Partner Makes The Representations Under Paragraph (c) Of This Clause. A Joint Venture Agrees That, In The Performance Of The Contract, The Applicable Percentage Specified In Paragraph (d) Of This Clause Will Be Performed By The Aggregate Of The Joint Venture Participants.
(g) Precedence. The Va Veterans First Contracting Program, As Defined In Vaar 802.101, Subpart 819.70, And This Clause, Takes Precedence Over Any Inconsistencies Between The Requirements Of The Sba Veteran Small Business Certification Program And The Va Veterans First Contracting Program.
(h) Misrepresentation. Pursuant To 38 U.s.c. 8127(g), Any Business Concern, Including All Its Principals, That Is Determined By Va To Have Willfully And Intentionally Misrepresented A Company S Sdvosb Status Is Subject To Debarment From Contracting With The Department For A Period Of Not Less Than Five Years (see Vaar 809.406 2 Causes For Debarment).
section D - Contract Documents, Exhibits, Or Attachments
see Attached Document: P09 Laser Etching Sow Brockton 02.
36c24125q0191
page 1 Of
page 1 Of
page 53 Of 53
page 53 Of 53
page 1 Of
page 1 Of
section E - Solicitation Provisions
addendum To Far 52.212-1 Instructions To Offerors Commercial Products And Commercial Services (sep 2023)
provisions That Are Incorporated By Reference (by Citation Number, Title, And Date), Have The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. The Version Of Far 52.212-1 In The Addendum Is Tailored For Simplified Acquisition Procedures And Supersedes The Current Version Of Far 52.212-1 Contained In The Far.
the Following Provision Is Incorporated Into 52.212-1 As An Addendum To This Solicitation:
52.212-1 Instructions To Offerors Commercial Products And Commercial Services (sep 2023)
(a)â north American Industry Classification System (naics) Code And Small Business Size Standard.â the Naics Code(s) And Small Business Size Standard(s) For Thisâ acquisitionâ appear Elsewhere In Theâ request For Quote (rfq). However, The Small Business Size Standard For A Concern That Submits Aâ quote, Other Than On Aâ constructionâ or Serviceâ acquisition, But Proposes To Furnish An End Item That It Did Not Itself Manufacture, Process, Or Produce Is 500 Employees If Theâ acquisition
is Set Aside For Small Business And Has A Value Above Theâ simplified Acquisition Threshold; Or
uses Theâ hubzoneâ price Evaluation Preference Regardless Of Dollar Value, Unless Theâ quoterâ waives The Price Evaluation Preference; Or
is An 8(a),â hubzone, Service-disabled Veteran-owned, Economically Disadvantaged Women-owned, Or Women-owned Small Business Set-aside Or Sole-source Award Regardless Of Dollar Value.
(b)â submission Ofâ quotes. Submit Signed And Datedâ quotesâ to The Office Specified In Thisâ request For Quote (rfq) At Or Before The Exact Time Specified.â quotesâ mayâ be Submitted On Letterhead Stationery, Or As Otherwise Specified In Theâ rfq. As A Minimum,â quotesâ mustâ show
â â â â â â â â â â â (1)â theâ solicitation Number;
â â â â â â â â â â â (2)â the Time Specified In Theâ solicitationâ for Receipt Ofâ quotations;â
â â â â â â â â â â (3)â the Name, Address, And Telephone Number Of Theâ quoter;
a Technical Description Of The Items Being Quoted In Sufficient Detail To Evaluate Compliance With The Requirements In Theâ solicitation. Thisâ mayâ include Product Literature, Or Other Documents, If Necessary;
â â â â â â â â â â â (5)â terms Of Any Expressâ warranty;
â â â â â â â â â â â (6)â price And Any Discount Terms;
â â â â â â â â â â â (7)â "remit To" Address, If Different Than Mailing Address;
(8)â a Completed Copy Of The Representations And Certifications At Federalâ acquisitionâ regulation (far)â 52.212-3â (see Farâ 52.212-3(b) For Those Representations And Certifications That Theâ quoterâ shallâ complete Electronically);
â â â â â â â â â â â (9)â acknowledgment Request For Quotation Amendments;
(10)â past Performanceâ will Not Be Considered In Simplified Acquisition Procurements.
(11)â quote Should Include A Statement Specifying The Extent Of Agreement With All Terms, Conditions, And Provisions Included In Theâ solicitation.â quotesâ that Fail To Furnish Required Representations And Certifications, Information Requested In (1) To (9), And Accept The Terms And Conditions Of Theâ solicitationâ mayâ be Excluded From Consideration.
(c)â period For Acceptance Ofâ quotes. Theâ quoterâ agrees To Hold The Prices In Itsâ quoteâ firm For 30 Calendar Days From The Date Specified For Receipt Ofâ quotes, Unless Another Time Period Is Specified In An Addendum To Theâ solicitation.
(d)â product Samples. When Required By Theâ solicitation, Product Samplesâ shallâ be Submitted At Or Prior To The Time Specified For Receipt Ofâ quotes. Unless Otherwise Specified In Thisâ solicitation, These Samplesâ shallâ be Submitted At No Expense To The Government, And Returned At The Sender S Request And Expense, Unless They Are Destroyed During Testing.
(e)â multipleâ quotes.â quotersâ are Encouraged To Submit Multipleâ quotesâ presenting Alternativeâ line Itemsâ (provided That The Alternativeâ line Itemsâ are Consistent With Farâ subpartâ 4.10), Or Alternativeâ commercial Productsâ orâ commercial Servicesâ for Satisfying The Requirements Of Thisâ solicitation. Eachâ quoteâ submitted Will Be Evaluated Separately.
(f)â late Submissions, Revisions, And Withdrawals Ofâ quotes.
(1)â quotersâ are Responsible For Submittingâ quotes So As To Reach The Government Office Designated In Theâ solicitationâ by The Time Specified In Theâ solicitation. If No Time Is Specified In Theâ solicitation, The Time For Receipt Is 4:30 P.m., Local Time, For The Designated Government Office On The Date Thatâ quotesâ are Due.
(2)â anyâ quotation Received At The Government Office Designated In Theâ solicitationâ after The Exact Time Specified For Receipt Ofâ quotesâ is "late" And May Not Be Considered Unless It Is Received Before Purchase Order Issuance And Theâ contracting Officerâ (co) Determines That Accepting The Lateâ quotationâ would Not Unduly Delay Theâ acquisition.
(3)â if Anâ emergencyâ or Unanticipated Event Interrupts Normal Government Processes So Thatâ quotations Cannot Be Received At The Government Office Designated For Receipt Ofâ quotesâ by The Exact Time Specified In Theâ solicitation, And Urgent Government Requirements Preclude A Notice Of An Extension Of The Closing Date, The Time Specified For Receipt Ofâ quotes Will Be Deemed To Be Extended To The Same Time Ofâ dayâ specified In Theâ solicitationâ on The First Workâ dayâ on Which Normal Government Processes Resume.
(g)â issuance Of Purchase Order. The Government May Issue A Purchase Order To One Or More Quoters As Identified In The Request For Quote (rfq). Therefore, Theâ quoter S Initialâ quoteâ shouldâ contain Theâ best Terms From A Price And Technical Standpoint. However, The Governmentâ mayâ reject Any Or Allâ quotesâ if Such Action Is In The Public S Best Interest. The Contracting Officer (co) May Issue A Purchase Order To Other Than The Quoter With The Lowest Priced Quotation.
(h)â multiple Awards. The Governmentâ mayâ issue A Purchase Order For Any Item Or Group Of Items Of A Quotation, Unless Theâ quoterâ qualifies Theâ quotation By Specific Limitations. Unless Otherwise Provided In The Schedule,â quotationsâ mayâ not Be Submitted For Quantities Less Than Those Specified. The Government Reserves The Right To Issue A Purchase Order For A Quantity Less Than The Quantity Quoted, At The Unit Prices Quoted, Unless Theâ quoterâ specifies Otherwise In Theâ quotation.
â â â â â â (1)â availability Of Requirements Documents Cited In Theâ solicitation.
(i)â the Gsa Index Of Federal Specifications, Standards And Commercial Item Descriptions, Fpmr Part 101-29, And Copies Of Specifications, Standards, And Commercial Item Descriptions Cited In Thisâ solicitationâ mayâ be Obtained For A Fee By Submitting A Request To- Gsa Federal Supply Service Specifications Section Suite 8100 470 East L Enfant Plaza, Sw Washington, Dc 20407 Telephone (202) 619-8925, Facsimile (202) 619-8978.
(ii)â if The General Services Administration, Department Of Agriculture, Or Department Of Veterans Affairs Issued Thisâ solicitation, A Single Copy Of Specifications, Standards, And Commercial Item Descriptions Cited In Thisâ solicitationâ mayâ be Obtained Free Of Charge By Submitting A Request To The Addressee In Paragraph (i)(1)(i) Of This Provision. Additional Copies Will Be Issued For A Fee.
(2)â most Unclassified Defense Specifications And Standardsâ mayâ be Downloaded From The Following Assist Websites:
â â â â â â â â â â â â â â â â (i)â assist (â https://assist.dla.mil/online/start/).
â â â â â â â â â â â â â â â â (ii)â quick Search (â http://quicksearch.dla.mil/).â â â â â â â â â â â
(3)â documents Not Available From Assistâ mayâ be Ordered From The Department Of Defense Single Stock Point (dodssp) By-
(i)â using The Assist Shopping Wizard (â https://assist.dla.mil/wizard/index.cfm);
(ii)â phoning The Dodssp Customer Service Desk (215) 697-2179, Mon-fri, 0730 To 1600 Est; Or
(iii)â ordering From Dodssp, Building 4, Section D, 700 Robbins Avenue, Philadelphia, Pa 19111-5094, Telephone (215) 697-2667/2179, Facsimile (215) 697-1462.
(4)â nongovernment (voluntary) Standardsâ mustâ be Obtained From The Organization Responsible For Their Preparation, Publication, Or Maintenance.
(j)â unique Entity Identifier (uei). Applies To All Quotesâ that Exceed Theâ micro-purchase Threshold, Andâ quotesâ at Or Below Theâ micro-purchase Thresholdâ if Theâ solicitationâ requires The Contractor To Beâ registered In The System For Award Management (sam).) Theâ quoterâ mustâ enter, In The Block With Its Name And Address On The Cover Page Of Itsâ quote, The Annotation "unique Entity Identifier" Followed By Theâ unique Entity Identifierâ that Identifies Theâ quoters Name And Address. Theâ quoterâ alsoâ must Enter Itsâ electronic Funds Transfer (eft) Indicator, If Applicable. The Eft Indicator Is A Four-character Suffix To Theâ uei. The Suffix Is Assigned At The Discretion Of Theâ quoterâ to Establish Additional Sam Records For Identifying Alternative Eft Accounts (see Farâ subpartâ 32.11) For The Same Entity. If Theâ quoterâ does Not Have A Uei, Itâ shouldâ contact The Entity Designated Atâ www.sam.govâ forâ ueiâ establishment Directly To Obtain One. Theâ quoterâ shouldâ indicate That It Is Aâ quoterâ for A Government Contract When Contacting The Entity Designated Atâ www.sam.govâ for Establishing Theâ uei.
(k)â [reserved]
(l)â requests For Information. The Co Will Not Notify Unsuccessful Quoters That Responded To This Request For Quotation (rfq). However, Quoters May Request Information On Purchase Order(s) Resulting From This Solicitation With The Co.
(end Of Provision)
e.3 52.252-1 Solicitation Provisions Incorporated By Reference (feb 1998)
This Solicitation Incorporates One Or More Solicitation Provisions By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. The Offeror Is Cautioned That The Listed Provisions May Include Blocks That Must Be Completed By The Offeror And Submitted With Its Quotation Or Offer. In Lieu Of Submitting The Full Text Of Those Provisions, The Offeror May Identify The Provision By Paragraph Identifier And Provide The Appropriate Information With Its Quotation Or Offer. Also, The Full Text Of A Solicitation Provision May Be Accessed Electronically At This/these Address(es):
Https://www.acquisition.gov/browse/index/far
Https://www.va.gov/oal/library/vaar/
(end Of Provision)
far Number
title
date
52.204-7
system For Award Management
nov 2024
52.211-6
brand Name Or Equal
aug 1999
52.233-2
service Of Protest
sep 2006
52.204-16
commercial And Government Entity Code Reporting
aug 2020
852.239-75
information And Communication Technology Accessibility Notice
feb 2023
(end Of Addendum To 52.212-1)
e.4 52.212-2 Evaluation Commercial Products And Commercial Services (nov 2021)
basis For Award. The Government Will Issue A Purchase Order To The Responsible Quoter Whose Quotation Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered.
the Following Factors Shall Be Used To Evaluate Quotations:
Price
Technical Review
technical And Past Performance, When Combined, Are Equal To Price.
evaluation Approach. The Government Will Evaluate Quotations Using The Comparative Evaluation Process Outlined In Far 13.106-2 (b) (3), Where Quotations Will Be Compared To One Another To Determine Which Provides The Best Benefit To The Government. The Government Reserves The Right To Consider A Quotation Other Than The Lowest Price That Provides Additional Benefit(s). Quotations May Exceed Minimum Requirements Of The Solicitation. The Government Reserves The Right To Select A Quotation That Provides Benefit To The Government That Exceeds The Minimum Requirements Of The Solicitation, But Is Not Required To Do So. Each Response Must Meet The Minimum Requirements Of The Solicitation. The Government Is Not Requesting Or Accepting Alternate Quotations.
the Evaluation Will Consider The Following:
technical Or Quality: The Quotation Will Be Evaluated To The Extent To Which It Can Meet And/or Exceed The Government S Requirements As Outlined In The Solicitation And Based On The Information Requested In The Instructions To Quoters Section Of The Solicitation.
past Performance: The Past Performance Evaluation Will Assess The Relative Risks Associated With A Quoter S Likelihood Of Success In Fulfilling The Solicitation S Requirements As Indicated By The Quoter S Record Of Past Performance. The Past Performance Evaluation May Be Based On The Contracting Officer S Knowledge Of And Previous Experience With The Supply Or Service Being Acquired; Customer Surveys, And Past Performance Questionnaire Replies; Contractor Performance Assessment Reporting System (cpars) At Http://www.cpars.gov/; Or Any Other Reasonable Basis.
veterans Involvement: In Accordance With Veterans Affairs Acquisition Regulation (vaar) 852.215-70 (deviation), Service-disabled Veteran-owned And Veteran-owned Small Business (vosb) Evaluation Factors, The Government Will Assign Evaluation Credit For A Quoter (i.e., Prime Contractor) Which Is A Service-disabled Veteran-owned Small Business (sdvosb) Or A Vosb. To Receive Credit, An Offeror Must Be Registered And Verified In Veteran Small Business Certification (vetcert) Database At Time Of Quotation Submission And At Time Of Award (https://veterans.certify.sba.gov/) And Must Meet Federal Small Business Size Standards For The North American Industry Classification System (naics) Code Assigned To This Solicitation. Non-sdvosb/vosb Quotations That Use Sdvosbs Or Vosbs As Subcontractors Will Receive Some Consideration Under This Evaluation Factor. Quoters Must State In Their Quotations The Names Of The Sdvosbs And Vosbs With Whom They Intend To Subcontract And Provide A Brief Description Of The Proposed Subcontracts And The Approximate Dollar Values Of The Proposed Subcontracts. In Addition, The Proposed Subcontractors Must Be Registered And Verified In The Veteran Small Business Certification (vetcert) Https://veterans.certify.sba.gov/) And Must Meet Federal Small Business Size Standards For The Naics Code Assigned To This Solicitation At Time Of Both Quotation Submission And At Time Of Award.
price: The Government Will Evaluate The Price By Adding The Total Of All Line Item Prices.
Closing Date20 Jan 2025
Tender AmountRefer Documents
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
United States
Details: 5. Project Number (if Applicable)
code
7. Administered By
2. Amendment/modification Number
code
6. Issued By
8. Name And Address Of Contractor
4. Requisition/purchase Req. Number
3. Effective Date
9a. Amendment Of Solicitation Number
9b. Dated
page Of Pages
10a. Modification Of Contract/order Number
10b. Dated
bpa No.
1. Contract Id Code
facility Code
code
offers Must Acknowledge Receipt Of This Amendment Prior To The Hour And Date Specified In The Solicitation Or As Amended, By One Of The Following Methods:
the Above Numbered Solicitation Is Amended As Set Forth In Item 14. The Hour And Date Specified For Receipt Of Offers
e. Important:
is Extended,
(a) By Completing Items 8 And 15, And Returning __________ Copies Of The Amendment; (b) By Acknowledging Receipt Of This Amendment On Each Copy Of The
offer Submitted; Or (c) By Separate Letter Or Electronic Communication Which Includes A Reference To The Solicitation And Amendment Numbers. Failure Of Your
acknowledgment To Be Received At The Place Designated For The Receipt Of Offers Prior To The Hour And Date Specified May
is Not Extended.
12. Accounting And Appropriation Data
(rev. 11/2016)
is Required To Sign This Document And Return ___________ Copies To The Issuing Office.
is Not,
a. This Change Order Is Issued Pursuant To: (specify Authority) The Changes Set Forth In Item 14 Are Made In The Contract Order No. In Item 10a.
15c. Date Signed
b. The Above Numbered Contract/order Is Modified To Reflect The Administrative Changes
set Forth In Item 14, Pursuant To The Authority Of Far 43.103(b).
result In Rejection Of Your Offer. If By Virtue Of This Amendment You Desire To Change An Offer Already Submitted, Such Change May Be Made By Letter
or Electronic Communication, Provided Each Letter Or Electronic Communication Makes Reference To The Solicitation And This Amendment, And Is Received Prior To
the Opening Hour And Date Specified.
c. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
d. Other
contractor
16c. Date Signed
14. Description Of Amendment/modification
16b. United States Of America
except As Provided Herein, All Terms And Conditions Of The Document Referenced In Item 9a Or 10a, As Heretofore Changed, Remains Unchanged And In Full Force And Effect.
15a. Name And Title Of Signer
16a. Name And Title Of Contracting Officer
15b. Contractor/offeror
standard Form 30
previous Edition Not Usable
prescribed By Gsa - Far (48 Cfr) 53.243
(type Or Print)
(type Or Print)
(organized By Ucf Section Headings, Including Solicitation/contract Subject Matter Where Feasible.)
(number, Street, County, State And Zip Code)
(if Other Than Item 6)
(specify Type Of Modification And Authority)
(such As Changes In Paying Office, Appropriation Date, Etc.)
(if Required)
(see Item 11)
(see Item 13)
(x)
check
one
13. This Item Applies Only To Modifications Of Contracts/orders,
it Modifies The Contract/order No. As Described In Item 14.
11. This Item Only Applies To Amendments Of Solicitations
amendment Of Solicitation/modification Of Contract
(signature Of Person Authorized To Sign)
(signature Of Contracting Officer)
1
4
0002
01-16-2025
none
36c250
department Of Veterans Affairs
ann Arbor Healthcare System
network Contracting Office 10
2215 Fuller Road
ann Arbor, Mi 48105
36c250
department Of Veterans Affairs
ann Arbor Healthcare System
network Contracting Office 10
2215 Fuller Road
ann Arbor, Mi 48105
to All Offerors/bidders
36c25025q0149
12-19-2024
x
x
x
1
see Continuation Page
1. The Purpose Of This Amendment Is To:
A. Answer Industry Questions;
B. Provide An Updated Statement Of Work (sow), Attached Herein, Which Must Be The Sow Submitted With Any Offer, And;
C. Provide A Revised Price Schedule, Attached Herein, Which Must Be The Price Schedule Submitted With Any Offer
2. No Other Changes To The Solicitation Are Made As A Result Of This Amendment.
jeannie Ortiz
contracting Officer
page 33 Of 44
a.1 Price/cost Schedule
item Number
description Of Supplies/services
quantity
unit
unit Price
amount
0001
4.00
mo
___________
____________
blue Pe1 - Elevator Maintenance, Repairs, Testing & Inspections
(warranty Coverage 12/16/2024 Through 12/15/2025)
contract Period: Base
pop Begin: 12-16-2025
pop End: 03-31-2026
0002
1.00
mo
___________
____________
blue Pe2 - Elevator Maintenance, Repairs, Testing & Inspection
(warranty Coverage 03/02/2025 To 03/01/2026)
contract Period: Base
pop Begin: 03-02-2026
pop End: 03-31-2026
0003
2.00
mo
___________
____________
blue Pe3 - Elevator Maintenance, Repairs, Testing & Inspection
(warranty Coverage 05/19/2025 To 05/18/2026)
contract Period: Base
pop Begin: 04-01-2025
pop End: 05-18-2025
0004
4.00
mo
___________
____________
blue Pe4 - Maintenance, Repairs, Testing & Inspection
(warranty Coverage And Gps 07/17/2025 To 07/16/2026)
contract Period: Base
pop Begin: 04-01-2025
pop End: 07-16-2025
0005
4.00
mo
___________
____________
yellow Pe8 - Elevator Maintenance, Repairs, Testing & Inspections
(warranty Coverage 12/16/2024 Through 12/15/2025)
contract Period: Base
pop Begin: 12-16-2025
pop End: 03-31-2026
0006
2.00
mo
___________
____________
yellow Pe9 - Elevator Maintenance, Repairs, Testing & Inspection
(warranty Coverage 05/19/2025 To 05/18/2026)
contract Period: Base
pop Begin: 04-01-2025
pop End: 05-18-2025
0007
1.00
mo
___________
____________
yellow Pe10 - Elevator Maintenance, Repairs, Testing & Inspection
(warranty Coverage 03/02/2025 To 03/01/2026)
contract Period: Base
pop Begin: 03-02-2026
pop End: 03-31-2026
0008
4.00
mo
___________
____________
red Pe11 - Elevator Maintenance, Repairs, Testing & Inspections
(warranty Coverage 12/16/2024 Through 12/15/2025)
contract Period: Base
pop Begin: 12-16-2025
pop End: 03-31-2026
0009
4.00
mo
___________
____________
red Pe12 - Maintenance, Repairs, Testing & Inspection
(warranty Coverage And Gps 07/17/2025 To 07/16/2026)
contract Period: Base
pop Begin: 04-01-2025
pop End: 07-16-2025
0010
1.00
mo
___________
____________
red Pe14 - Elevator Maintenance, Repairs, Testing & Inspection
(warranty Coverage 03/02/2025 To 03/01/2026)
contract Period: Base
pop Begin: 03-02-2026
pop End: 03-31-2026
0011
5.00
mo
___________
____________
blue Se5 - Maintenance, Repairs, Testing & Inspection
(warranty Coverage 09/01/2025 To 08/31/2026)
contract Period: Base
pop Begin: 04-01-2025
pop End: 08-31-2025
0012
5.00
mo
___________
____________
red Se15 - Maintenance, Repairs, Testing & Inspection
(warranty Coverage 09/01/2025 To 08/31/2026)
contract Period: Base
pop Begin: 04-01-2025
pop End: 08-31-2025
0013
8.00
mo
___________
____________
blue Se6 - Maintenance, Repairs, Testing & Inspection
(warranty Coverage 12/01/2025 To 11/30/2026)
contract Period: Base
pop Begin: 04-01-2025
pop End: 11-30-2025
0014
8.00
mo
___________
____________
red Se16 - Maintenance, Repairs, Testing & Inspection
(warranty Coverage 12/01/2025 To 11/30/2026)
contract Period: Base
pop Begin: 04-01-2025
pop End: 11-30-2025
0015
4.00
mo
___________
____________
blue Fe7 - Maintenance, Repairs, Testing & Inspection
(warranty Coverage And Gps 07/17/2025 To 07/16/2026)
contract Period: Base
pop Begin: 04-01-2025
pop End: 07-16-2025
0016
5.00
mo
___________
____________
yellow Cl7 - Maintenance, Repairs, Testing & Inspection
(warranty Coverage 09/01/2025 To 08/31/2026)
contract Period: Base
pop Begin: 04-01-2025
pop End: 08-31-2025
0017
8.00
mo
___________
____________
yellow Cl8 - Maintenance, Repairs, Testing & Inspection
(warranty Coverage 12/01/2025 To 11/30/2026)
contract Period: Base
pop Begin: 04-01-2025
pop End: 11-30-2025
0018
3.00
mo
___________
____________
blue Ge1 - Maintenance, Repairs, Testing & Inspections
(warranty Coverage 07/03/2025 To 07/02/2026)
contract Period: Base
pop Begin: 04-02-2025
pop End: 07-02-2025
0019
3.00
mo
___________
____________
red Ge3 - Maintenance, Repairs, Testing & Inspections
(warranty Coverage 07/03/2025 To 07/02/2026)
contract Period: Base
pop Begin: 04-02-2025
pop End: 07-02-2025
0020
7.00
mo
___________
____________
blue Ge2 - Maintenance, Repairs, Testing & Inspections
(warranty Coverage 11/03/2025 To 11/02/2026)
contract Period: Base
pop Begin: 04-02-2025
pop End: 11-02-2025
0021
7.00
mo
___________
____________
red Ge2 - Maintenance, Repairs, Testing & Inspections
(warranty Coverage 11/03/2025 To 11/02/2026)
contract Period: Base
pop Begin: 04-02-2025
pop End: 11-02-2025
base Year Total: $ _____________
1001
12.00
mo
___________
____________
blue Pe1 - Elevator Maintenance, Repairs, Testing & Inspections
contract Period: Option 1
pop Begin: 04-01-2026
pop End: 03-31-2027
1002
12.00
mo
___________
____________
blue Pe2 - Elevator Maintenance, Repairs, Testing & Inspection
contract Period: Option 1
pop Begin: 04-01-2026
pop End: 03-31-2027
1003
11.00
mo
___________
____________
blue Pe3 - Elevator Maintenance, Repairs, Testing & Inspection
(warranty Coverage 05/19/2025 To 05/18/2026)
contract Period: Option 1
pop Begin: 05-19-2026
pop End: 03-31-2027
1004
9.00
mo
___________
____________
blue Pe4 - Maintenance, Repairs, Testing & Inspection
(warranty Coverage And Gps 07/17/2025 To 07/16/2026)
contract Period: Option 1
pop Begin: 07-17-2026
pop End: 03-31-2027
1005
12.00
mo
___________
____________
yellow Pe8 - Elevator Maintenance, Repairs, Testing & Inspections
contract Period: Option 1
pop Begin: 04-01-2026
pop End: 03-31-2027
1006
11.00
mo
___________
____________
yellow Pe9 - Elevator Maintenance, Repairs, Testing & Inspection
(warranty Coverage 05/19/2025 To 05/18/2026)
contract Period: Option 1
pop Begin: 05-19-2026
pop End: 03-31-2027
1007
12.00
mo
___________
____________
yellow Pe10 - Elevator Maintenance, Repairs, Testing & Inspection
contract Period: Option 1
pop Begin: 04-01-2026
pop End: 03-31-2027
1008
12.00
mo
___________
____________
red Pe11 - Elevator Maintenance, Repairs, Testing & Inspections
contract Period: Option 1
pop Begin: 04-01-2026
pop End: 03-31-2027
1009
9.00
mo
___________
____________
red Pe12 - Maintenance, Repairs, Testing & Inspection
(warranty Coverage And Gps 07/17/2025 To 07/16/2026)
contract Period: Option 1
pop Begin: 07-17-2026
pop End: 03-31-2027
1010
12.00
mo
___________
____________
red Pe14 - Elevator Maintenance, Repairs, Testing & Inspection
contract Period: Option 1
pop Begin: 04-01-2026
pop End: 03-31-2027
1011
7.00
mo
___________
____________
blue Se5 - Maintenance, Repairs, Testing & Inspection
(warranty Coverage 09/01/2025 To 08/31/2026)
contract Period: Option 1
pop Begin: 09-01-2026
pop End: 03-31-2027
1012
7.00
mo
___________
____________
red Se15 - Maintenance, Repairs, Testing & Inspection
(warranty Coverage 09/01/2025 To 08/31/2026)
contract Period: Option 1
pop Begin: 09-01-2026
pop End: 03-31-2027
1013
4.00
mo
___________
____________
blue Se6 - Maintenance, Repairs, Testing & Inspection
(warranty Coverage 12/01/2025 To 11/30/2026)
contract Period: Option 1
pop Begin: 12-01-2026
pop End: 03-31-2027
1014
4.00
mo
___________
____________
red Se16 - Maintenance, Repairs, Testing & Inspection
(warranty Coverage 12/01/2025 To 11/30/2026)
contract Period: Option 1
pop Begin: 12-01-2026
pop End: 03-31-2027
1015
9.00
mo
___________
____________
blue Fe7 - Maintenance, Repairs, Testing & Inspection
(warranty Coverage And Gps 07/17/2025 To 07/16/2026)
contract Period: Option 1
pop Begin: 07-17-2026
pop End: 03-31-2027
1016
7.00
mo
___________
____________
yellow Cl7 - Maintenance, Repairs, Testing & Inspection
(warranty Coverage 09/01/2025 To 08/31/2026)
contract Period: Option 1
pop Begin: 09-01-2026
pop End: 03-31-2027
1017
4.00
mo
___________
____________
yellow Cl8 - Maintenance, Repairs, Testing & Inspection
(warranty Coverage 12/01/2025 To 11/30/2026)
contract Period: Option 1
pop Begin: 12-01-2026
pop End: 03-31-2027
1018
9.00
mo
___________
____________
blue Ge1 - Maintenance, Repairs, Testing & Inspections
(warranty Coverage 07/03/2025 To 07/02/2026)
contract Period: Option 1
pop Begin: 07-03-2026
pop End: 03-31-2027
1019
9.00
mo
___________
____________
red Ge3 - Maintenance, Repairs, Testing & Inspections
(warranty Coverage 07/03/2025 To 07/02/2026)
contract Period: Option 1
pop Begin: 07-03-2026
pop End: 03-31-2027
1020
5.00
mo
___________
____________
blue Ge2 - Maintenance, Repairs, Testing & Inspections
(warranty Coverage 11/03/2025 To 11/02/2026)
contract Period: Option 1
pop Begin: 11-03-2026
pop End: 03-31-2027
1021
5.00
mo
___________
____________
red Ge2 - Maintenance, Repairs, Testing & Inspections
(warranty Coverage 11/03/2025 To 11/02/2026)
contract Period: Option 1
pop Begin: 11-03-2026
pop End: 03-31-2027
option Year 1 Total: $_____________
2001
12.00
mo
___________
____________
blue Pe1 - Elevator Maintenance, Repairs, Testing & Inspections
contract Period: Option 2
pop Begin: 04-01-2027
pop End: 03-31-2028
2002
12.00
mo
___________
____________
blue Pe2 - Elevator Maintenance, Repairs, Testing & Inspection
contract Period: Option 2
pop Begin: 04-01-2027
pop End: 03-31-2028
2003
12.00
mo
___________
____________
blue Pe3 - Elevator Maintenance, Repairs, Testing & Inspection
contract Period: Option 2
pop Begin: 04-01-2027
pop End: 03-31-2028
2004
12.00
mo
___________
____________
blue Pe4 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 2
pop Begin: 04-01-2027
pop End: 03-31-2028
2005
12.00
mo
___________
____________
yellow Pe8 - Elevator Maintenance, Repairs, Testing & Inspections
contract Period: Option 2
pop Begin: 04-01-2027
pop End: 03-31-2028
2006
12.00
mo
___________
____________
yellow Pe9 - Elevator Maintenance, Repairs, Testing & Inspection
contract Period: Option 2
pop Begin: 04-01-2027
pop End: 03-31-2028
2007
12.00
mo
___________
____________
yellow Pe10 - Elevator Maintenance, Repairs, Testing & Inspection
contract Period: Option 2
pop Begin: 04-01-2027
pop End: 03-31-2028
2008
12.00
mo
___________
____________
red Pe11 - Elevator Maintenance, Repairs, Testing & Inspections
contract Period: Option 2
pop Begin: 04-01-2027
pop End: 03-31-2028
2009
12.00
mo
___________
____________
red Pe12 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 2
pop Begin: 04-01-2027
pop End: 03-31-2028
2010
12.00
mo
___________
____________
red Pe14 - Elevator Maintenance, Repairs, Testing & Inspection
contract Period: Option 2
pop Begin: 04-01-2027
pop End: 03-31-2028
2011
12.00
mo
___________
____________
blue Se5 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 2
pop Begin: 04-01-2027
pop End: 03-31-2028
2012
12.00
mo
___________
____________
red Se15 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 2
pop Begin: 04-01-2027
pop End: 03-31-2028
2013
12.00
mo
___________
____________
blue Se6 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 2
pop Begin: 04-01-2027
pop End: 11-30-2028
2014
12.00
mo
___________
____________
red Se16 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 2
pop Begin: 04-01-2027
pop End: 11-30-2028
2015
12.00
mo
___________
____________
blue Fe7 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 2
pop Begin: 04-01-2027
pop End: 03-31-2028
2016
12.00
mo
___________
____________
yellow Cl7 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 2
pop Begin: 04-01-2027
pop End: 03-31-2028
2017
12.00
mo
___________
____________
yellow Cl8 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 2
pop Begin: 04-01-2027
pop End: 11-30-2028
2018
12.00
mo
___________
____________
blue Ge1 - Maintenance, Repairs, Testing & Inspections
(warranty Coverage 07/03/2025 To 07/02/2026)
contract Period: Option 2
pop Begin: 04-01-2027
pop End: 03-31-2028
2019
12.00
mo
___________
____________
red Ge3 - Maintenance, Repairs, Testing & Inspections
(warranty Coverage 07/03/2025 To 07/02/2026)
contract Period: Option 2
pop Begin: 04-01-2027
pop End: 03-31-2028
2020
12.00
mo
___________
____________
blue Ge2 - Maintenance, Repairs, Testing & Inspections
contract Period: Option 2
pop Begin: 04-01-2027
pop End: 03-31-2028
2021
12.00
mo
___________
____________
red Ge2 - Maintenance, Repairs, Testing & Inspections
contract Period: Option 2
pop Begin: 04-01-2027
pop End: 03-31-2028
option Year 2 Total: $_____________
3001
12.00
mo
___________
____________
blue Pe1 - Elevator Maintenance, Repairs, Testing & Inspections
contract Period: Option 3
pop Begin: 04-01-2028
pop End: 03-31-2029
3002
12.00
mo
___________
____________
blue Pe2 - Elevator Maintenance, Repairs, Testing & Inspection
contract Period: Option 3
pop Begin: 04-01-2028
pop End: 03-31-2029
3003
12.00
mo
___________
____________
blue Pe3 - Elevator Maintenance, Repairs, Testing & Inspection
contract Period: Option 3
pop Begin: 04-01-2028
pop End: 03-31-2029
3004
12.00
mo
___________
____________
blue Pe4 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 3
pop Begin: 04-01-2028
pop End: 03-31-2029
3005
12.00
mo
___________
____________
yellow Pe8 - Elevator Maintenance, Repairs, Testing & Inspections
contract Period: Option 3
pop Begin: 04-01-2028
pop End: 03-31-2029
3006
12.00
mo
___________
____________
yellow Pe9 - Elevator Maintenance, Repairs, Testing & Inspection
contract Period: Option 3
pop Begin: 04-01-2028
pop End: 03-31-2029
3007
12.00
mo
___________
____________
yellow Pe10 - Elevator Maintenance, Repairs, Testing & Inspection
contract Period: Option 3
pop Begin: 04-01-2028
pop End: 03-31-2029
3008
12.00
mo
___________
____________
red Pe11 - Elevator Maintenance, Repairs, Testing & Inspections
contract Period: Option 3
pop Begin: 04-01-2028
pop End: 03-31-2029
3009
12.00
mo
___________
____________
red Pe12 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 3
pop Begin: 04-01-2028
pop End: 03-31-2029
3010
12.00
mo
___________
____________
red Pe14 - Elevator Maintenance, Repairs, Testing & Inspection
contract Period: Option 3
pop Begin: 04-01-2028
pop End: 03-31-2029
3011
12.00
mo
___________
____________
blue Se5 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 3
pop Begin: 04-01-2028
pop End: 03-31-2029
3012
12.00
mo
___________
____________
red Se15 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 3
pop Begin: 04-01-2028
pop End: 03-31-2029
3013
12.00
mo
___________
____________
blue Se6 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 3
pop Begin: 04-01-2028
pop End: 11-30-2029
3014
12.00
mo
___________
____________
red Se16 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 3
pop Begin: 04-01-2028
pop End: 11-30-2029
3015
12.00
mo
___________
____________
blue Fe7 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 3
pop Begin: 04-01-2028
pop End: 03-31-2029
3016
12.00
mo
___________
____________
yellow Cl7 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 3
pop Begin: 04-01-2028
pop End: 03-31-2029
3017
12.00
mo
___________
____________
yellow Cl8 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 3
pop Begin: 04-01-2028
pop End: 11-30-2029
3018
12.00
mo
___________
____________
blue Ge1 - Maintenance, Repairs, Testing & Inspections
contract Period: Option 3
pop Begin: 04-01-2028
pop End: 03-31-2029
3019
12.00
mo
___________
____________
red Ge3 - Maintenance, Repairs, Testing & Inspections
contract Period: Option 3
pop Begin: 04-01-2028
pop End: 03-31-2029
3020
12.00
mo
___________
____________
blue Ge2 - Maintenance, Repairs, Testing & Inspections
contract Period: Option 3
pop Begin: 04-01-2028
pop End: 03-31-2029
3021
12.00
mo
___________
____________
red Ge2 - Maintenance, Repairs, Testing & Inspections
contract Period: Option 3
pop Begin: 04-01-2028
pop End: 03-31-2029
Option Year 3 Total: $_____________
4001
12.00
mo
___________
____________
blue Pe1 - Elevator Maintenance, Repairs, Testing & Inspections
contract Period: Option 4
pop Begin: 04-01-2029
pop End: 03-31-2030
4002
12.00
mo
___________
____________
blue Pe2 - Elevator Maintenance, Repairs, Testing & Inspection
contract Period: Option 4
pop Begin: 04-01-2029
pop End: 03-31-2030
4003
12.00
mo
___________
____________
blue Pe3 - Elevator Maintenance, Repairs, Testing & Inspection
contract Period: Option 4
pop Begin: 04-01-2029
pop End: 03-31-2030
4004
12.00
mo
___________
____________
blue Pe4 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 4
pop Begin: 04-01-2029
pop End: 03-31-2030
4005
12.00
mo
___________
____________
yellow Pe8 - Elevator Maintenance, Repairs, Testing & Inspections
contract Period: Option 4
pop Begin: 04-01-2029
pop End: 03-31-2030
4006
12.00
mo
___________
____________
yellow Pe9 - Elevator Maintenance, Repairs, Testing & Inspection
contract Period: Option 4
pop Begin: 04-01-2029
pop End: 03-31-2030
4007
12.00
mo
___________
____________
yellow Pe10 - Elevator Maintenance, Repairs, Testing & Inspection
contract Period: Option 4
pop Begin: 04-01-2029
pop End: 03-31-2030
4008
12.00
mo
___________
____________
red Pe11 - Elevator Maintenance, Repairs, Testing & Inspections
contract Period: Option 4
pop Begin: 04-01-2029
pop End: 03-31-2030
4009
12.00
mo
___________
____________
red Pe12 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 4
pop Begin: 04-01-2029
pop End: 03-31-2030
4010
12.00
mo
___________
____________
red Pe14 - Elevator Maintenance, Repairs, Testing & Inspection
contract Period: Option 4
pop Begin: 04-01-2029
pop End: 03-31-2030
4011
12.00
mo
___________
____________
blue Se5 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 4
pop Begin: 04-01-2029
pop End: 03-31-2030
4012
12.00
mo
___________
____________
red Se15 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 4
pop Begin: 04-01-2029
pop End: 03-31-2030
4013
12.00
mo
___________
____________
blue Se6 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 4
pop Begin: 04-01-2029
pop End: 11-30-2030
4014
12.00
mo
___________
____________
red Se16 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 4
pop Begin: 04-01-2029
pop End: 11-30-2030
4015
12.00
mo
___________
____________
blue Fe7 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 4
pop Begin: 04-01-2029
pop End: 03-31-2030
4016
12.00
mo
___________
____________
yellow Cl7 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 4
pop Begin: 04-01-2029
pop End: 03-31-2030
4017
12.00
mo
___________
____________
yellow Cl8 - Maintenance, Repairs, Testing & Inspection
contract Period: Option 4
pop Begin: 04-01-2029
pop End: 11-30-2030
4018
12.00
mo
___________
____________
blue Ge1 - Maintenance, Repairs, Testing & Inspections
contract Period: Option 4
pop Begin: 04-01-2029
pop End: 03-31-2030
4019
12.00
mo
___________
____________
red Ge3 - Maintenance, Repairs, Testing & Inspections
contract Period: Option 4
pop Begin: 04-01-2029
pop End: 03-31-2030
4020
12.00
mo
___________
____________
blue Ge2 - Maintenance, Repairs, Testing & Inspections
contract Period: Option 4
pop Begin: 04-01-2029
pop End: 03-31-2030
4021
12.00
mo
___________
____________
red Ge2 - Maintenance, Repairs, Testing & Inspections
contract Period: Option 4
pop Begin: 04-01-2029
pop End: 03-31-2030
option Year 4 Total: $_____________
base Plus Four Option Year Grand Total: $_____________
answers To Vendor Questions Asked 36c25025q0149
section B. Scope Of Work Oncall And Onsite Schedule
a. Please Clarify The Minimum Time Required To Be Included In The Monthly Cost.
i. This Section States 50 Hours Of On-call Service (10hours Per Day)
1. Are These Hours In Addition To The 8hrs Per Day Maintenance Requirement For Monday, Wednesday, And Friday 2. 50 On Call Hours Please Clarify If These Hours Are Regular Time Or Overtime Hours. (there Are Cost Differences)
answer: On-call Hours Are Regular Time And Separate From On-site Hours On Monday, Wednesday & Friday. There Is No Overtime For Any Services Required Under The Contract. This Is A Firm, Fixed-price Contract, And As Stated In The Sow The Monthly Rate Is To Be All-inclusive Of All Services Required Unless It Is Something Clearly Listed In The Exclusions.
section B. Scope Of Work Callback Services
a. Does This Section Apply To Elevator Union Holidays As Well?
answer: The Only Holidays Recognized/applicable Under This Federal Acquisition Are Federal Holidays A Link To The Federal Holidays At The Opm Website Was Included In The Rfq. See Sow Section B, Item 4, Sub Items A & B For Call-back Services Details.
section B. Scope Of Work Callback Services 7
a. This Section States That Cleaning Of Door Tracks Are The Responsibility Of The Contractor.
i. Based On The Site Requirements The Elevator Contractor Would Lonely Be Onsite 3 Days A Week And Cannot Monitor The Tracks On A Daily Basis.
answer: Item 7 Does Not Identify This As A Daily Requirement, Therefore, The Expectation Is That The Contractor Will Be Responsible For This On The Days They Are There/scheduled To Be There.
ii. Can This Be A Shared Responsibility?
answer: The Contract Awardee Will Be Required To Do This.
iii. Within The Industry, Cleaning Of Door Sills Are The Responsibility Of The Facility. We Check And Monitor When Conducting Maintenance Only.
answer: The Sow Is What Drives The Acquisition And Future Contract Contractor Will Be Required To Perform These Services And Follow All Requirements Listed In The Sow.
section B. Scope Of Work Callback Services 12
answer: In The Sow, There Is No Callback Services 12 There Is A Sow, Section B, Item 12 Which Is Not Related To Call-back Services, If That Is What Is Being Referenced.
this Section States That The Cor Can Elect To Have Repairs Completed On Overtime At No Additional Cost.
answer: Yes, This Is An All-inclusive, Firm, Fixed-price Acquisition. All Services Required Must Be Covered Under The Monthly Rate With The Only Exception Being Items Clearly On The Exclusions List.
i. There Is No Way To Capture That Cost Without Knowing What Could Be Required To Replace On Overtime.
answer: There Are No Overtime Hours As A Firm, Fixed-price Contract Does Not Engage In Variable Types Of Rates. Repairs Are Required Under The Contract Unless They Are Clearly Listed On The Exclusions List. The Monthly Rate Shall Cover All Services Required Under The Contract. Some Months May Require More Repair Work, While Other Months, Contractor Would Receive The Entire Monthly Payment When No Repairs Are Required. Please See The Attached Revised Sow For Slightly Updated Language To Section B, Item 12.
ii. Would The Cor Be Willing To Adjust This Section To Cover The Cost Of The Difference In Labor (premium Portion Of Labor) Premium Portion Standard Rate.
answer: No. This Is A Firm, Fixed-price Acquisition, Therefore, Additional/variable Rates Do Not Apply. The Contract Will Be All-inclusive Of Services Required, With A Monthly Fixed Rate, Fixed Annual Value, And A Fixed Total Contract Value (assuming Each Option Year Is Exercised At Government Discretion).
section B. Scope Of Work Inspections 14, Performance Parameters 19
this Section Details Inspection Reports And Key Performance Indicators/parameters
i. Please Provide Evidence That The Units Included Within The Rfp Meet These Requirements And Parameters
answer: Asme 17.1 Performance Parameters For Elevators Are Required. This Includes Elevators Still In Operation Since 1996, Elevators That Were Renovated In 2024, And New Elevators That Will Be Operational In 2025. Please See The Attached Sow For Updated Language To Section B, Item 19.
does The Cor Recognize Elevator Union Holidays?
answer: The Only Holidays Concerned/recognized Under This Federal Acquisition Are Federal Holidays A Link To The Federal Holidays At The Opm Website Was Included In The Rfq See Sow, Section E, Item 1 For The Opm Federal Holiday Link.
is The Cor Aware Of Any City Of Detroit Elevator Division Violations That Are Outstanding?
if So, Please Provide Documentation
answer: The Service Is Unaware Of Any Facility Vertical Lift That Has Any Municipal Violations That Are Outstanding.
how Will Pre-maintenance Repairs, Vandalism Etc Be Handled?
answer: Regarding Vandalism, See/review Sow, Section F. Regarding Pre-maintenance Repairs, A Repair Is A Repair, Whether Pre- Or Post-maintenance. Repairs Of Any Nature, Except For Items On The Exclusion List, Are To Be Covered Under The Contract And Handled By Contractor In A Timely Manner Once The Contract Is Effective. All Elevators Are As Is If A Repair Is Required, The Contractor Is Required To Do The Repair.
in The Event Of Water And/or Oil, Fluid Accumulates In The Elevator Pit, How Will It Be Handled?
a. Is This A Billable Situation
answer: There Are No Billable Situations With A Firm, Fixed-price Contract. The Monthly Rate Paid By The Government Is Not A Variable Rate But A Firm, Fixed-rate Which Covers All Services Required Unless Clearly Listed As An Exclusion On The Exclusions List.
will The Site Remove The Fluid And Dispose?
answer: The Contractor Is Required To Remove The Fluid And Properly Dispose Of It.
will The Contractor Be Responsible For Removing The Fluid
answer: The Contractor Is Required To Remove The Fluid And Properly Dispose Of It.
who Is Responsible For Maintaining The Elevator Phone Lines?
answer: Contractor Is Responsible For Maintaining The Operation Of Elevator Cabin Phones.
a. Elevator Contractors Do Not Manage Or Run The Lines.
answer: The Facility Will Provide An Operational Phone Signal, But The Contractor Is Responsible For Connecting Both Ends Of The Telephone Line (at Elevator Cabin, Within Each Elevator Travel Cable , And At Elevator Control Panel) In Order To Have Operational Phones In Each Elevator Cabin.
b. If The Event Of An Inoperable Phone, Is The Site Responsible For Contacting The Phone Company
answer: In The Event Of An Inoperable Phone, Detroit Va S Office Of Information & Technology (oi&t)/telecom Staff Will Repair Any Faulty Phone Signal. If The Facility Telecom Staff Confirms The Phone Signal Is Being Provided, Then The Contractor Is Responsible For Repairing An Inoperable Phone.
how Will Obsolescence Be Handled?
answer: None Of The Elevators Will Be Obsolete During The Course Of The Awarded Contract, Even If All Option Years Are Exercised, Therefore, This Question Is Irrelevant.
the Site Is Currently Modernizing Elevators
a. Are There Any Components That Are Considered Proprietary?
i. If So, Please Detail How The Cor Would Like To Approach The Situation
answer: The Service/cor Is Unaware Of Any Proprietary Components. Contractors Must Be Capable Of Repairing Or Replacing Elevator Equipment To Properly Maintain The Facility S Vertical Lifts.
badging Training
a. Please Detail Any Training Or Badging Requirements Needed For Access
answer: Upon Arrival At Detroit Va, Contractor/contractor Staff Are Required To Report To Cor Who Will Handle Badge Information/access, Training Information And Any Other Items Required.
will The Cor Consider Alternate Maintenance Approaches That Differ From The 3 Day A Week Maintenance Requirement?
answer: No, The Sow Defines Exactly What The Requirement/needs Are.
part A: I Noticed That There Are 3 New Elevators Red Garage 1, Blue Garage 3, And Red Passenger 13 These Upon Expiration Of Will Be Installed And Are Not On The List.â Is The Intent To Add These To The Agreement?
answer: Yes, The Intent Will Likely Be To Add Them To The Contract Via Contract Modification At Whatever Point In Future They Should Be Added, However, For The Purposes Of The Contract Required At Present Time (which Does Not Include The Unknowns Regarding These Three Elevators), These Elevators Are Not Included In The Sow And Any Offers Submitted Should Related To The Actual Contents/requirements Of The Sow.
part B: All 21 Elevators In The Hospital And Garages Are Undergoing Modernizations Over The Next 2 Years Plus Finishing At Various Times.â as The Elevators Are Upgraded They Go Onto A Free Service Period.â i Believe It Is A Full Year Free Service. If A Company Other Than The Installation Company Works On The Elevators In Any Way It Voids The Warranty.â it Would Appear If The Installation Company Is Not Maintaining These Upgraded Elevators The Va Is Paying Twice For The Same Services And Possibly Voiding Warranties.â is This The Intent Of This Agreement?
answer: To More Clearly Define Which Elevators Will Be Requiring Services Under The Contract For Certain Periods Of Time, A New Price Schedule Has Been Drafted And Is Attached To This Amendment. Not All Elevators Will Need Services At The Same Time/in The Same Years, And As Such, It Is Imperative To Price Services Accordingly. Offerors Should Make Careful Note To Only Price Services For The Months Required, For The Base Year And For Each Potential Option Year, For Each Elevator.
please Provide Any Information Available On:
the Manufacture Of Controls, Geared Or Gearless Type Of Machine And,
answer:
1. Original Parking Elevators:
A. Dover (hydraulic) Motor.
B. Dover Wcr Control Panel.
2. Original Cart-lifts:
A. Dover Motor.
B. Dover Msd1 Control Panel.
3. Original Freight Elevator:
A. Dover (hydraulic) Motor.
B. Dover Wcr Control Panel.
4. Original Passenger Elevators And Original Service Elevators:
A. Dover Motor.
B. Thyssenkrupp Tac 50-04 Control Panel.
5. New Passenger Elevators:
A. Kone Mx40 Motor.
B. Kone Kcm Control Panel.
6. New Service Elevator 15 And Service Elevator 16:
A. Kone Mx40 Motor.
B. Kone Kcm Control Panel.
7. New Service Elevator 5 And Service Elevator 6:
A. Kone Mx Machine. (not The Same As Motor For Se15 & Se16).
B. Kone Kcm Control Panel.
8. New Parking Elevators:
A. Kone Mx Machine.
B. Kone Kcm Control Panel.
how Many Stops Each Elevator Has.
answer: This Information Is For The 21 Elevators Associated With This Requirement, And Also For The 3 Additional That May Or May Not Be Added To The Contract At A Later Date. Please Ensure Any Offer Submitted Pertains Only To The Actuals Of This Acquisition.
cart-lifts 7 And 8 (cl7, Cl8) Have Two Stops: Lower Level (ll) And Floor Four (f4).
freight Elevator (fe7) Has Two Stops: Ll And F1.
blue Parking Elevators 1, 2, And 3 (ge1, Ge2, Ge3) Have Six Stops: Ll Thru F5.
red Parking Ge1, Ge2, And Ge3 Have Six Stops: Ll Thru F5.
blue Passenger Elevators (pe1, Pe2, Pe3, Pe4) Have Eight Stops: Ll Thru F7.
blue Service Elevators (se5, Se6) Have Eight Stops: Ll Thru F7.
yellow Pe8 Has Six Stops: Ll Thru F5.
yellow Pe9 And Pe10 Have Five Stops: Ll Thru F4.
red Pe11, Pe12, Pe13, And Pe14 Have Six Stops: Ll Thru F5.
red Se15 And Se16 Have Six Stops: Ll Thru F5.
please Provide Any Outstanding Repairs, Inspection Items To Be Corrected, Etc.:
answer: The Only Outstanding Issue Is With Cart-lift (cl) 8 For Dirty Surgical Instruments. A Padlock Has Been On The Power Switch Since 2019 For Two Reasons:
cart-lift Travels At About One-third The Expected Vertical Speed.
surgical Staff, Multiple Elevator Specialists, And I Have Witnessed Cl8 Travel Up And Down While Lobby Doors Are 100 Percent Open At Floor Four.
44
page 44 Of 44
statement Of Work
general
the Detroit Va Medical Center (dva) Located At 4646 John R. Street, Detroit, Michigan 48201 Requires A Firm, Fixed-price Contract For Preventive Maintenance And Repairs For All Operational Vertical Lifts At Vamc Detroit. Contractor Shall Provide All Tools, Parts, Materials, Equipment, Labor, Certified Elevator Specialists/technicians, Supervision, Licenses, Insurance And Transportation Necessary To Perform Preventive Maintenance, Repairs, Inspections And Call-back Services For The Vertical Transport Equipment Listed In This Statement Of Work (sow). Contractor Shall Provide Maintenance In A Manner Which Ensures The Safe And Continuous Operation Of All Equipment Listed In Accordance With Commercial Practices Or Manufacturer's Specifications (ansi-asme Al7).
firm, Fixed-price Contracts Cover The Services Listed Within (with Exception To Any Exclusions List) At A Set Monthly Price, And Overall Total Contract Value. All Services And Repairs Under This Contract Are Included In The Monthly Price (except For Items On The Exclusions List).
scope Of Work:
elevator Services Include, But Are Not Limited To Scheduled Weekly Inspections, Adjustments, Cleaning And Lubrication Of All Machinery, Machinery Spaces, Hoist Ways, And Pits.
reports:
annual No-load Test
five-year Full-load Test
on-call And On-site Schedule:
the Contractor Shall Provide On-call Service Of 50 Hours Per Week, Ten Hours Per Day, Monday Through Friday, From 7:00 Am To 5:00 Pm Et, For All Vertical Transportation Equipment.
following Are Maintenance Hours Required By This Contract. Contractor Shall Be On-site:
monthly: 96 Hours
weekly: 24 Hours
Assigned Day: 8-hour Shift. Assigned Days Are Monday, Wednesday And Friday,
Unless One Of Those Days Is A Federal Holiday, In Which The Shift Shall Be Adjusted
To A Non-federal Holiday Business Day That Week, Subject To Cor Approval.
call-back Services:
the Contractor Shall Provide Call-back Service During Federal Holidays And Non-business Hours For Emergencies. The Contractor Shall Provide Make-up Inspection Hours Lost Due To Holidays By Scheduling Additional Preventative Maintenance Hours Within The Month The Holiday Occurs.
example: If The Holiday Falls On A Monday, Then The Makeup Day Shall Be Either Tuesday Or Thursday.
contractor Shall Provide Scheduled Weekly Examinations, Adjustments, Cleaning, And
Lubrication Of All Machinery, Machinery Spaces, Hoist Ways, And Pits.
Contractor Shall Maintain All Parts Of The Vertical Transportation Equipment Systems
Consisting Of, But Not Limited To, The Following:
hoisting Machinery
operating And Signal Fixtures
wire Ropes
door Operating And Safety Equipment
control Apparatus And Power Drives .
fixed Mechanical Equipment
auxiliary Apparatus (to Include Any Cart Ejection Systems) And Appurtenance
electrical Wiring And Traveling Cables
mechanical And Electrical Safety Devices
contractor Shall Ensure That Elevator Door Tracks Are Free From Dirt And Debris To Ensure Smooth, Proper Operation Of Elevator Doors.
contractor Shall Replace All Burned Out Light Bulbs Inside The Elevator Cabs To Maintain Proper Lighting At All Times. Vamc Detroit Will Provide The Light Bulbs For The Contractor.
Install As Used In The Work Required, Specifications And Drawings Shall Mean Furnish, Install, Connect, Adjust And Test Except Where Otherwise Specified.
brand Names Are Specified To Indicate Performance And Quality Characteristics. No Substitutes Of Specified Materials Shall Be Accepted.
emergency Generator Test: Vamc Detroit Conducts Testing Of The Facility S Emergency Generators On The First Wednesday Of Each Month, From 6:15 Am To 6:45 Am. Duties To Be Performed Shall Include The Following:
before 6:00 Am: Be Present For Duty To Participate In The Test.
no Later Than 6:05 Am: Assist Vamc Detroit Staff In Utilizing The Fire Recall System To Bring All Elevators To The First Floor. Note: Waiting Until Five Minutes After 6:00 Am Is To Give Biomedical Engineering Staff Necessary Time To Shut Down Biomedical Equipment Prior To Generator Testing.
after 6:15 Am: When The Facility Disconnects From Detroit Edison At 6:15 Am, The Contractor Will Assist Vamc Detroit Staff In Turning Off The Fire Recall System And Ensure That At Least One Elevator Is Running At Each Elevator Bank For The Duration Of The Generator Test.
assist Va Staff In Performing Code Blue Testing On Selected Elevators During The Test.
different Elevators Will Be Selected By The Cor For Each Test.
be Available To Troubleshoot Any Problems Occurring With The Elevators When Normal Power Has Been Restored Upon The Conclusion Of The Test.
the Cor Will Notify The Contractor If There Is A Need To Take A Vertical Lift Out Of Service In Order For Contractor To Make Repairs. If The Contractor Determines That A Vertical Lift Is Operating In An Unsafe Manner, The Contractor Is Authorized To Remove The Vertical Lift From Service And Must Notify The Cor Immediately. The Cor Will Coordinate With The Contractor To Repair Off-line Vertical Lifts In A Timely Fashion. Repairs Will Be Covered Under This Contract Unless It Is An Item Clearly Listed On The Exclusions List.
testing:
the Next Five-year Full-load Test Is Due In 2025.
monthly: Examine All Safety Devices And Governors.
quarterly:
test The Communications And Elevator Fire Safety System.
the Fire Safety System Testing Includes Manual Recall (phase I) And Fireman S
elevator Operation (phase Ii).
confirmation And Results Of All Tests Shall Be Forwarded To The Cor Upon Completion Of Testing.
annually No-load Test Of Safety Mechanisms:
conduct A No-load Test Of Safety Mechanisms, In Accordance With The American Society Of Mechanical Engineers, Asme/ans1 A17.1 (2010).
confirmation And Results Of All Tests Shall Be Forwarded To The Cor Upon Completion Of Testing.
every Five Years Full Load Test Of Safety Mechanisms. During The Full-load Test, The Following Shall Also Be Conducted:
conduct A Full-load Test Of Safety Mechanisms, In Accordance With The American Society Of Mechanical Engineers, Asme/ans1 A17.1 (2010).
inspect Car Balances.
inspect The Governors. Set Them, Recalibrate Them, And Seal Them For Proper Tripping Speed.
confirmation And Results Of All Tests Shall Be Forwarded To The Cor Upon Completion Of Testing.
inspections:
the Contractor Shall Provide Vertical Transportation System Efficiency And Maintenance Survey Inspections Annually. The Results Of These Inspections Shall Be Summarized With Appropriate Backup Material In An Annual Report To The Cor By The End Of The Month Following The Anniversary Date Of The Contract. This Report Shall Include The Following Performance Parameters And Summary Data For Each Vertical Transportation Unit As Appropriate:
unit Speed Up And Oem Specification.
unit Speed Down And Oem Specification.
door Open Speed And Oem Specification.
door Close Speed Normal And Code Limit.
door Close Speed Reduced And Code Limit.
door Closing Torque And Code Limit.
door Dwell Time For Car Call.
door Dwell Time For Hall Call.
leveling Accuracy Summary And Oem Specification.
date Of The Last Annual / Five-year Safety Test Completed.
date Of The Last Annual Communications And Fire Recall System Test.
annualized Call-back Rate With Backup Detail.
dedicated Maintenance Hours For The Preceding Twelve Months.
semi-annual Inspections By Independent Consultant: Contractor Shall Accompany Cor Or Vamc Detroit S Independent Consultant On Inspections To Audit The Facility S Elevator Operations Every Six Months.
the Independent Consultant Shall Provide Semi-annual Inspection Reports To The Cor.
the Cor Shall Provide A Copy Of These Reports To The Contractor. The Contractor And Cor Will Determine Who Is Responsible For The Abatement Of Deficiencies Listed In The Semi-annual Reports.
the Cor Shall Provide A Copy Of These Reports To The Chief Of Facility Management Service. The Chief Of Facility Management Service Will Determine Abatement Procedures For Deficiencies That Are The Responsibility Of Vamc Detroit.
the Cor Shall Archive Corrective Actions Taken By Contractor And Chief Of Facility Management, For A File-retention Period Of Five Years.
lubrication: Lubricate Monthly (12 Times Per Year At Regularly Scheduled Intervals), All Mechanical Parts Recommended To Be Lubricated By The Oem Of The Vertical Transportation Equipment.
cleaning: The Contractor Shall, During All Examinations, Remove And Discard Immediately All Accumulated Dirt And Debris From The Pit Areas, And Be Responsible For Always Maintaining The Cleanliness Of All Elevator Machine Rooms. Additionally, Prior To Each Annual Anniversary Date Of This Contract, Contractor Shall Thoroughly Clean Down The Entire Hoist Way Of All Accumulated Dirt, Grease, Dust, And Debris.
painting: Contractor Shall Keep Machinery Exterior And Any Rust-prone Equipment Clean And Painted. Motor Windings And Controller Coils Shall Be Periodically Treated With Proper Insulating Compound. The Machine Room Floor And All Storage Areas Shall Be Painted Annually With Good Quality Deck Enamel.
repairs And Replacements Shall Be Made Promptly By Contractor, Or When The Cor Advises The Contractor To Do So. Repairs And Replacements Shall Be Made In Accordance With Conformance Standards And Oem Standards. Repair And Replacement Of Parts Shall Be New/genuine Oem Or Equal In Design, Workmanship, Quality, Finish Fit, Adjustment, Operation And Appearance. Repairs And Replacements Shall Apply To All Mechanical, Electronic, And Electrical Parts, Including But Not Limited To:
automatic Power And Manually Operated Door Systems, Car Door And Gate Hangers, Car Door And Gate Contact, Door Protective Device, Guides, Stops And Appurtenances, Car Safety Mechanism, Platform, Car Sills, Car Guide Shoes, Gibs Or Rollers And Appurtenances.
geared And Gearless Machinery, Worm, Gear, Bearings, Drive Sheave, Deflector Sheave, And Brake Assembly, Component Parts And All Associated Castings.
motor, Motor Generator, Motor Windings, Rotating Element, Stator, Bearings, Rotors, Starters, Solid-state Power Drives Complete And Associated Apparatus, Speed Monitoring Equipment And Attachments.
controller, Selector And Dispatching Equipment, All Relays, Solid State Components, Resistors, Condensers, Transformers, Contact Leads, Dashpots, Timing Devices, Computer Devices, Insulators, Solenoids, Resistance Grids, Mechanical And Electrical Driving Equipment, Diagnostics, Troubleshooting Tools, Monitors And Associated Apparatus.
governor, Governor Sheave And Shaft Assembly, Bearings, Contacts And Governor Tension Sheave Assemblies.
overhead, Deflector Or Secondary Sheaves, Bearings, Car And Counterweight Buffers, Car And Counterweight Guide Rails, Top And Bottom Limit Switches, Activating Cams, Compensating Equipment, Counterweight And Counterweight Guide Shoes Including Rollers Or Gibs.
hoist Way Door Interlocks, Top Tracks, Hanger Rollers, Operating Linkages And Auxiliary Door Closing Devices, Hoist Way Landing, Leveling And Encoding Systems Complete, And Power Door Clutch-engaging Systems Complete.
car And Hall Lanterns, Lobby Fixtures, Car Operating Panels, Car And Hall Position Indicators, Hall Push-button Fixtures, Audible/visible Signals And Controls Complete, Emergency Lighting, Communication Devices, Remote Operating And Signal Equipment Complete.
the Contractor Shall Examine And Equalize Tension On All Wire Ropes And Renew Them Whenever Necessary To Ensure The Maintenance Of Adequate Safety Factor. Contractor Shall Also Shorten All Ropes As Required To Maintain Legal Bottom Clearances And Perform All Safety Code Re-shackling Procedures Per Asme/ans1 A17.1 (2010).
contractor Shall Repair Or Replace All Electrical Traveling Cables, Wiring And Conductors Extending To The Vertical Transportation Unit From Main Line Switch In The Machine Room And Outlets In The Hoist Ways. The Main Power Switch And Its Fuses Are Excluded.
contractor Shall Be Responsible For Changing Lightbulbs And Lighting Fixtures In The Cab, Pit, Machine Room, And Hoist Way As Required. Dva Will Provide The Light Bulbs.
hydraulic Systems Components, Including But Not Limited To, Tanks, Valves, Pump, Cylinder Head, Above Ground Piping, Hoses, Fittings, Gauges, Seals, O-rings, Packing S, Belts, Recovery Devices, Overflow Devices, Rescuvator (auxiliary Power Device) Or Other Emergency Operating And Signal Systems, Above-grade Cylinder And Plunger Assemblies Complete, Cathodic Protection Devices, Muffler, Heater And Shut-off Valves.
performance Parameters: All Vertical Lifts Shall Meet The Standards Required By The American Society Of Mechanical Engineers (asme). Performance Parameters For Each Vertical Lift Must Comply With The Particular Version Of Asme 17.1, Safety Code For Elevators And Escalators, That Was In Effect At The Time Of Installation Or With The Most Recent Version For Each Renovated Vertical Lift.
spare Parts: The Contractor Shall Provide And Maintain A Supply Of Contacts, Coils, Solid-state Boards And Associated Components, Leads, Brushes, Lubricants, Wiping Cloths, Rollers, Guides, Switches, And Other Minor Parts In The Vertical Transportation System(s) Machine Room(s) For The Performance Of Routine Preventive Maintenance. All Spare Parts Shall Be Kept In Storage Cabinets Provided By The Contractor.
record Keeping:
a Complete Permanent Record Of Maintenance Inspections And Routines, Repair Work, Lubrication, And Call Back Service Will Be Kept In The Machine Room. These Records Are To Be Always Available To The Cor. The Records Shall Indicate The Reason The Mechanic Was In The Building, Arrival And Departure Time, The Work Performed, Etc., And These Records Shall Be Property Of Vamc Detroit. Record Keeping Requirements Are The Responsibility Of Contractor S Maintenance Personnel.
a Contractor S Proprietary System That Fulfills The Requirements In The Above Paragraph Will Be Accepted In Lieu Of The Method Specified, However, All Records, Including Annual Summary Reports Must Be Provided To The Cor And Are Property Of Dva.
Hot Work :
precautions Shall Be Taken By The Contractor, To Prevent Accidental Operation Of Any Existing Smoke Detectors By Minimizing The Amount Of Dust Generated In The Vicinity Of Any Smoke Detectors.
the Contractor Shall Not Perform Any Hot Work Without An Approved Hot Work Permit From The Cor. Hot Work Is Any Work That May Generate A Source Of Ignition In Areas Where Flammable Or Combustible Materials May Be Present. Welding, Flame Cutting, Use Of Pneumatic Hammers, Soldering, Brazing, Thermal Spraying, Thawing Pipe And Spark Producing Equipment Are Examples Of This Type Of Work.
before Any Hot Work Is Conducted, The Contractor Or Sub-contractors Shall Obtain A Hot Work Permit From The Cor. Cor Is The Overseer And Decider On Any And All Hot Work To Be Performed.
contractor Storage Space On Dva Premises: There Will Be Space Made Available To Contractor For Storing Items. The Cor Will Designate The Space; The Space Designated May Be Subject To Change With Dva.
list Of Elevators Requiring Services
lift Name
lift Type
lift Location
maximum Lift Capability
blue Pe1
geared Traction Passenger Elevator
blue Tower
4000
blue Pe2
geared Traction Passenger Elevator
blue Tower
4000
blue Pe3
geared Traction Passenger Elevator
blue Tower
4000
blue Pe4
geared Traction Passenger Elevator
blue Tower
4000
yellow Pe8
geared Traction Passenger Elevator
yellow Tower
5000
yellow Pe9
geared Traction Passenger Elevator
yellow Tower
5000
yellow Pe10
geared Traction Passenger Elevator
yellow Tower
5000
red Pe11
geared Traction Passenger Elevator
red Tower
4000
red Pe12
geared Traction Passenger Elevator
red Tower
4000
red Pe14
geared Traction Passenger Elevator
red Tower
4000
blue Se5
geared Traction Service Elevator
blue Tower
6000
blue Se6
geared Traction Service Elevator
blue Tower
6000
red Se15
geared Traction Service Elevator
red Tower
5000
red Se16
geared Traction Service Elevator
red Tower
5000
blue Fe7
hydraulic Freight Elevator
blue Tower
6000
yellow Cl7
geared-traction Cart Lifts
yellow Tower
1000
yellow Cl8
geared-traction Cart Lifts
yellow Tower
1000
red Ge2
hydraulic Garage Elevators
red Garage
3500
red Ge3
hydraulic Garage Elevators
red Garage
3500
blue Ge1
hydraulic Garage Elevators
blue Garage
3500
blue Ge2
hydraulic Garage Elevators
blue Garage
3500
elevator Warranty Coverage Periods
during The Specific Warranty Period Listed For Each Elevator, An Elevator Modernization Warranty Is In Effect And Contractor Shall Not Perform Any Services To Any Elevator Within The Warranty Period Listed. Contractor Shall Provide All Sow Services Required For Any Elevator Beginning On The First Day That Elevator Is No Longer Covered Under Warranty. For Example, Elevator Blue Pe1 S Last Day Under Warranty Is 12/15/2025, Therefore, Contractor Must Begin Providing Services On 12/16/2025. The Following Schedule Is Provided To Clarify Existing Warranty Coverage Periods For Each Elevator:
ten Gearless-traction Elevators:
blue Pe1 (warranty Coverage And Gps 12/16/2024 To 12/15/2025)
blue Pe2 (warranty Coverage And Gps 03/02/2025 To 03/01/2026)
blue Pe3 (warranty Coverage And Gps 05/19/2025 To 05/18/2026)
blue Pe4 (warranty Coverage And Gps 07/17/2025 To 07/16/2026)
yellow Pe8 (warranty Coverage And Gps 12/16/2024 To 12/15/2025)
yellow Pe9 (warranty Coverage And Gps 05/19/2025 To 05/18/2026)
yellow Pe10 (warranty Coverage And Gps 03/02/2025 To 03/01/2026)
red Pe11 (warranty Coverage And Gps 12/16/2024 To 12/15/2025)
red Pe12 (warranty Coverage And Gps 07/17/2025 To 07/16/2026)
red Pe14 (warranty Coverage And Gps 03/02/2025 To 03/01/2026)
four Service Elevators:
blue Se5 (warranty Coverage And Gps 09/01/2025 To 08/31/2026)
blue Se6 (warranty Coverage And Gps 12/01/2025 To 11/30/2026)
red Se15 (warranty Coverage And Gps 09/01/2025 To 08/31/2026)
red Se16 (warranty Coverage And Gps 12/01/2025 To 11/30/2026)
one Hydraulic Freight Elevator:
blue Fe7 (warranty Coverage And Gps 07/17/2025 To 07/16/2026)
two Geared-traction Cart-lifts:
yellow Cl7 (warranty Coverage And Gps 09/01/2025 To 08/31/2026)
yellow Cl8 (warranty Coverage And Gps 12/01/2025 To 11/30/2026)
four Gearless-traction Elevators:
blue Ge1 (warranty Coverage And Gps 07/03/2025 To 07/02/2026)
blue Ge2 (warranty Coverage And Gps 11/03/2025 To 11/02/2026)
red Ge2 (warranty Coverage And Gps 11/03/2025 To 11/02/2026)
red Ge3 (warranty Coverage And Gps 07/03/2025 To 07/02/2026)
conformance Standards
asme A17.1 / Csa B44 Safety Code For Elevators And Escalators (2013) Or Current
asme A17.1 Safety Code For Elevators And Escalators The Particular Version Of Asme 17.1 In Effect At Time Of Installation Or At Time Of Most Recent Renovation Of Each Vertical Lift
asme A17.2 Guide For Inspection Of Elevators, Escalators, And Moving Walks (2012) Or Current
compliance With The Current Editions Of Ansi/asme Al 7 (a17.1, A17.2, And A17.3)
original Equipment Manufacture (oem) Standards And Requirements
va Standards And Regulations
days And Hours Of Operation / Federal Holidays
a List Of All Federal Holidays Can Be Found At: Https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/
all Work, Including Regular Examinations And Repairs In Accordance With This Contract Are To Be Made During Regular Business Hours Between 6:00 Am To 4:30 Pm, Monday Through Friday, Except For Federal Holidays.
exclusions
all Repairs, Parts And Labor Required For Repairs Shall Be Included, At No Additional Cost, Unless It Is Clearly And Specifically An Excluded Item Listed Below:
any Extra Charge Work Clearly Due To Vandalism Or Misuse. Contracting Officer Must Be Informed In Advance And Approve Of Work Being Outside Of Scope For This Contract No Invoice Will Be Paid Without Prior Approval.
installation Of New Attachments, Which May Be Required Or Recommended By Insurance Agencies Or Government Authorities.
repairs Or Replacement Of Cab Enclosure, Hoist Way Enclosures, Door Frames (not Doors) And Sills, Machine Room Lighting, Cab Tile Or Carpet.
replacement Of Underground Hydraulic Piping Or Hydraulic Cylinder.
it Is To Be Understood That Any Item Not Specifically Excluded In The List Above Shall Be Considered The Contractor's Responsibility And Fall Within The Costs Of This Contract.
contractor & Contractor Staff Responsibilities
maintenance Work Shall Be Performed Only By Employees Directly Employed And Supervised By The Contractor. Contractor Employees Shall Be Experienced And Certified In Maintaining Vertical Transportation Systems/elevators.
the Contractor Shall Be Regularly Engaged In The Business Of Servicing Equipment Similar To That Being Maintained Under This Contract And Shall Have Done So For A Period Of At Least Five Years Prior To The Date Of The Solicitation For This Contract. The Contractor Shall Have A Permanent Service Branch Capable Of Providing Normal Service Within Two Hours After A Request Is Made And Emergency Call-back Service As Specified In Paragraph 17.
contractor Shall Make All Repairs Or Replacements Due To Damage By Contractor Employee Improper Repair, Negligent Or Willful Acts, Or Omissions Of Required Information, Services, Repairs, Etc.
Closing Date7 Feb 2025
Tender AmountRefer Documents
Bureau Of Corrections leyte Regional Prison Abuyog Leyte Tender
Others
Philippines
Details: Description Philippine Bidding Documents (as Harmonized With Development Partners) Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Government Of The Republic Of The Philippines Sixth Edition January 2025 Table Of Contents Glossary Of Acronyms, Terms, And Abbreviations ………………………….2 Section I. Invitation To Bid……………………………………………………..5 Section Ii. Instructions To Bidders…………………………………………...8 1. Scope Of Bid ………………………………………………………………………. 9 2. Funding Information………………………………………………………………. 9 3. Bidding Requirements ……………………………………………………………. 9 4. Corrupt, Fraudulent, Collusive, And Coercive Practices 9 5. Eligible Bidders…………………………………………………………………… 9 6. Origin Of Goods ………………………………………………………………….. 10 7. Subcontracts ……………………………………………………………………… 10 8. Pre-bid Conference ………………………………………………………………. 10 9. Clarification And Amendment Of Bidding Documents …………………………… 10 10. Documents Comprising The Bid: Eligibility And Technical Components …………. 10 11. Documents Comprising The Bid: Financial Component …………………………... 11 12. Bid Prices …………………………………………………………………………. 11 13. Bid And Payment Currencies ……………………………………………………… 12 14. Bid Security ………………………………………………………………………. 12 15. Sealing And Marking Of Bids ……………………………………………………… 12 16. Deadline For Submission Of Bids …………………………………………………. 13 17. Opening And Preliminary Examination Of Bids ………………………………….. 13 18. Domestic Preference ……………………………………………………………… 13 19. Detailed Evaluation And Comparison Of Bids ……………………………………. 13 20. Post-qualification ………………………………………………………………… 14 21. Signing Of The Contract …………………………………………………………… 14 Section Iii. Bid Data Sheet …………………………………………………..15 Section Iv. General Conditions Of Contract ……………………...………..17 1. Scope Of Contract ………………………………………………………………… 18 2. Advance Payment And Terms Of Payment ……………………………………….. 18 3. Performance Security ……………………………………………………………. 18 4. Inspection And Tests ……………………………………………………………… 18 5. Warranty …………………………………………………………………………. 18 6. Liability Of The Supplier ………………………………………………………….. 19 Section V. Special Conditions Of Contract ………………………………….20 Section Vi. Schedule Of Requirements ……………………………………....24 Section Vii. Technical Specifications …………………………………………25 Section Viii. Checklist Of Technical And Financial Documents …………..29 Glossary Of Acronyms, Terms, And Abbreviations Abc – Approved Budget For The Contract. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Cda - Cooperative Development Authority. Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Cif – Cost Insurance And Freight. Cip – Carriage And Insurance Paid. Cpi – Consumer Price Index. Ddp – Refers To The Quoted Price Of The Goods, Which Means “delivered Duty Paid.” Dti – Department Of Trade And Industry. Exw – Ex Works. Fca – “free Carrier” Shipping Point. Fob – “free On Board” Shipping Point. Foreign-funded Procurement Or Foreign-assisted Project– Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Framework Agreement – Refers To A Written Agreement Between A Procuring Entity And A Supplier Or Service Provider That Identifies The Terms And Conditions, Under Which Specific Purchases, Otherwise Known As “call-offs,” Are Made For The Duration Of The Agreement. It Is In The Nature Of An Option Contract Between The Procuring Entity And The Bidder(s) Granting The Procuring Entity The Option To Either Place An Order For Any Of The Goods Or Services Identified In The Framework Agreement List Or Not Buy At All, Within A Minimum Period Of One (1) Year To A Maximum Period Of Three (3) Years. (gppb Resolution No. 27-2019) Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Gppb – Government Procurement Policy Board. Incoterms – International Commercial Terms. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Supplier – Refers To A Citizen, Or Any Corporate Body Or Commercial Company Duly Organized And Registered Under The Laws Where It Is Established, Habitually Established In Business And Engaged In The Manufacture Or Sale Of The Merchandise Or Performance Of The General Services Covered By His Bid. (item 3.8 Of Gppb Resolution No. 13-2019, Dated 23 May 2019). Supplier As Used In These Bidding Documents May Likewise Refer To A Distributor, Manufacturer, Contractor, Or Consultant. Un – United Nations. Section I. Invitation To Bid Republic Of The Philippines Department Of Justice Bureau Of Corrections Leyte Regional Prison Abuyog, Leyte Invitation To Bid For The Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) 1. The Leyte Regional Prison, Through The General Appropriations Act (gaa) Of 2025 Intends To Apply The Sum Of Three Hundred Ten Thousand Pesos Only (₱310,000.00) Being The Abc To Payments Under The Contract For Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Leyte Regional Prison, Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required Until December 31, 2025 From The Receipt Of Notice To Proceed (ntp) And Contract Agreement. Bidders Should Have Completed, Within The Last Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project Equivalent To At Least Twenty-five Percent (25%) Of The Abc. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Leyte Regional Prison Bac Secretariat Using The Contact Below And Inspect The Bidding Documents At The Address Given Below During Monday To Friday From 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 17, 2025 8:00am - 5:00pm To January 24, 2025 8:00am – 8:55pm From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Hundred Pesos Only (₱500.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees And Presented In Person. 6. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before January 24, 2025 @ 9:00am. Late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 8. Bid Opening Shall Be On January 24, 2025 @ 9:00am At The Lrp – Conference Room, Administration Building, Leyte Regional Prison. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 9. Schedule Of The Bidding Activities Shall Be As Follows: Activites Date/time Venue 1. Sale And Issuance Of Bid Documents January 17, 2025 8:00am To 5:00pm To January 24, 2025 8:00am To 8:55am Office Of The Bac/bac Secretariat, Leyte Regional Prison, Abuyog, Leyte 2. Submission And Opening Of Bid Documents January 24, 2025 @ 9:00am Conference Room, Admin Building, Lrp, Abuyog, Leyte 10. The Lrp Bac Shall Use Non-discretionary And Non-discriminatory Measure Based On Sheer Luck As A Tie-breaking Tool (draw Lots) In The Event That Two Or More Bidders Were Declared As Lcrb In-order To Determine The Final Lcrb Based On The Following: I. In Alphabetical Order, The Bidder Shall Pick One Rolled Paper Ii. The Lucky Bidder Who Would Pick A Paper With “congratulations” Remark Shall Be Declared As The Final Lcrb And Recommended For The Award Of The Contract. 11. The Leyte Regional Prison Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Jeruel Go Office Of The Bac Secretariat Leyte Regional Prison, Abuyog, Leyte Cp # 09455311532, Email: Leurejz@yahoo.com 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.bucor.gov.ph/ Www.philgeps.gov.ph Date Of Issue: January 16, 2025 Mr. Tracy B. Soriano Bac Chairperson Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Leyte Regional Prison Wishes To Receive Bids For The Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) With Identification Number Bid 2024-05rb. The Procurement Project For Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Is Composed Of One (1) Lot, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 2025 In The Amount Of Three Hundred Ten Thousand Pesos Only (₱310,000.00). A. The Source Of Funding Is National Expenditure Program. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Twenty Percent (20%) Of The Project. The Procuring Entity Has Prescribed That Subcontracting Is Not Allowed 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address {[insert If Applicable] And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within Two (2) Years Prior To The Deadline For The Submission And Receipt Of Bids 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 11.5. Financial Proposals For Single Or Multi-year Framework Agreement Shall Be Submitted Before The Deadline Of Submission Of Bids As Prescribed In The Ib. For Multi-year Framework Agreement, Evaluation Of The Financial Proposal During This Stage Is For Purposes Of Determining Eligibility And Whether Or Not Such Financial Proposal Is Within The Abc. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In E. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In Section Vii (technical Specifications). 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. A. Payment Of The Contract Price Shall Be Made In Philippine Pesos 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until May 24, 2025. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On January 24, 2025 @ 9:00 Am At Lrp Administrative Building Conference Room As Indicated In Paragraph 7 Of The Ib. 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded As One Project Having Several Items That Shall Be Awarded As One Contract. 19.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20. Post-qualification 20.1. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Any Food Catering Services. B. Completed Within The Last Two (2) Years Equivalent To At Least Twenty-five Percent (25%) Of The Abc, Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 Subcontracting Is Not Allowed 12 No Further Instruction. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than ₱6,200.00, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than ₱15,500.00 If Bid Security Is In Surety Bond. 15 Electronic Copy/electronic Submission Is Not Allowed Each Bidder Shall Submit One (1) Original Copy And Three (3) Photocopies Of The First And Second Components Of Its Bid. 19.4 One Project Having Several Items That Shall Be Awarded As One Contract. 20.1 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its; 1. Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) 2. Supporting Documents For The Slcc (sales Invoice Or Official Receipt Or End-users Acceptance) 3. Valid And Current Registration Certificate (sec Certificate Of Registration For Corporation Or Dti Certificate Of Registration For Sole Proprietorship Or Cda Certificate Of Registration For Cooperative) 4. Valid And Current Mayor’s Or Business Permit 5. Valid And Current Tax Clearance 6. Certificate Of Compliance Occupational Safety And Health Standards Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1. Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2. The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than Prior To The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184 4. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 5.2 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Special Conditions Of Contract Special Conditions Of Contract Gcc Clause Delivery And Documents – Delivery Of The Catering Services Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi. Schedule Of Requirements. Delivery Time Of The Food To Be Served As Follows: Am Snacks – Not Later Than 9:30 Am Lunch – Not Later Than 11:30 Am Pm Snacks – Not Later Than 2:30 Pm Upon Delivery Of The Catering Services To The Project Site, The Supplier Shall Notify The Procuring Entity And Present The Following Documents To The Procuring Entity: (i) Original And Four Copies Of The Supplier’s Invoice Showing Goods’ Description, Quantity, Unit Price, And Total Amount; (ii) Delivery Receipt Detailing Number And Description Of Items Received Signed By The Procuring Entity’s Representative At The Project Site; (iii)certificate Of Acceptance/inspection Report Signed By The Procuring Entity’s Representative At The Project Site; For Purposes Of This Clause, The Procuring Entity’s Representative At The Project Site Is The End-user, Or His Duly Authorized Representative. When A Seminar Has Been Rescheduled Or Cancelled, Leyte Regional Prison, Reserves The Right To Cancel The Catering Service Upon Formal Notice To The Caterer Two (2) Days Prior To The Start Of The Occassions. In Such Case, Leyte Regional Prison, Has No Obligation To Pay The Supplier The Amount Corresponding To The Cancelled Catering Service. Where There Is An Increase Or Decrease Of Participants, The End-user Shall Inform The Supplier Of The Same Three (3) Days Prior The Occasion Date. Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Transportation – The Transport Of The Food To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. The Procuring Entity Accepts No Liability For The Damage/spoilage Of Food During Transit. The Contract Price For The Catering Service Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Amount Stipulated In The Purchase Request (pr). After Each Occasion, The Supplier Is Responsible For Sending To The Leyte Regional Prison, A Billing Or Final Invoice For The Costs Of The Catering Service For Every Occasion Completed. It Shall Also Turn Over To The Bureau Any Remains/left Over Of The Catering Services Every End Of The Day For Its Use. 2.2 Partial Payment Is Not Allowed Cost For E-vat And Other Governmental Costs Which Fall Equally On All Prospective Suppliers Are Presumed To Be Included In The Computation Of The Bid Price 4 The Inspections And Tests That Will Be Conducted Are: The Evaluation Activities That Will Be Conducted At The Leyte Regional Prison, Upon Delivery Are As Follows: (1) Food Tasting On A Sampling Basis To Determine The Quality Of Food Served. (2) Ocular Inspection To Determine The Quantity And Completeness Of The Food Delivered In Accordance To The Menu Set In The Schedule Of Requirements. (3) Observation Before, During And After The Training Schedule To Determine The Quality Of Service Given By The Supplier. (4) Surveys Among The Participants To Determine The Level Of Satisfaction Of The Participants To The Service Rendered By The Supplier 6 Liability Of The Supplier: A. To Provide Food And Services For The Number Of Participants On The Basis Of The Information Given By The Procuring Entity Thru Df Of Pr Signed By The End-user Or Authorized Representative, At Least Two (2) Days Prior To The Training Schedule. B. During The Training, To Increase/ Decrease The Number Of Meals/snacks To Be Served For The Remaining Days Of A Specific Training Schedule, To Take Effect On The Second Day, Provided That Written Notice Is Given By The Procuring Entity Signed By The End-user Or Authorized Representative, Not Later Than 3:00 Pm On The First Day Of The Training. C. During The Training, To Adjust On Any Specific Food/diet Restrictions (religion Or Health Reasons) Of Participants’ Meals To Be Served For The Remaining Days Of A Specific Training Schedule, To Take Effect On The Second Day Provided That Written Notice Is Given By The Procuring Entity Signed By The End-user Or Authorized Representative, Not Later Than 3:00 Pm On The First Day Of The Training D. To Substitute The Menu For A Specific Training Schedule Due To Justifiable Reasons (unavailability In The Market, Red Tide, Supply And Demand Forces, Tropical Depression, Advisory Of Nonslaughter, Etc.) Provided That Notice Is Given To The Procuring Entity At Least One (1) Day Prior To The Schedule. Provided Further That The Change In The Menu Will Not Change The Unit Cost. E. To Reschedule/cancel The Seminar Due To Fortuitous Event/instances Beyond The Control Of Leyte Regional Prison F. To Provide The Necessary Clean And/or Sterile Dining Utensils During The Training As Enumerated In But Not Limited To The Following: 1) Glasses; 2) Spoons; 3) Forks; 4) Serving Spoons; 5) Cups; 6) Bowls; 7) Knives; 8) Trays; 9) Pitchers; 10) Glass Rack; 11) Ice Bucket; 12) Food Warmers; 13) Toothpicks; And 14) Condiments. G. To Provide Clean Table Cloth, Seat Covers And Table Napkins In The Designated Dining Area. H. To Assign At Least Two (2) Waiters/ Waitresses In Clean Working Garments Per Class/seminar And Shall Secure An Updated Health Certification From The Medical Health/authorized Officer. I. To Maintain A High Standard Of Sanitation And Cleanliness Of The Dining Area And Its Immediate Surroundings At All Times Adopting The Policy Of “clean As You Go”. Section Vi. Schedule Of Requirements The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. State “comply” Or “not Comply” To The Statement Of Compliance. Item No. Description Quantity Delivery Schedule 1 Meals: Breakfast 620 Pax From The Receipt Of Ntp Up To December 31, 2025 Lunch 620 Pax From The Receipt Of Ntp Up To December 31, 2025 Dinner 620 Pax From The Receipt Of Ntp Up To December 31, 2025 2 Snacks: Am Snacks 620 Pax From The Receipt Of Ntp Up To December 31, 2025 Pm Snacks 620 Pax From The Receipt Of Ntp Up To December 31, 2025 The Quantity/units Is For Bidding Purposes Only. In The Actual Implementation Of The Contract, The Quantity/units That May Be Required May Increase/decrease As The Need Arises. I/we Hereby Commit To Comply And Deliver All The Above Requirements In Accordance With The Above Stated Schedule. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Section Vii. Technical Specifications Republic Of The Philippines Department Of Justice Bureau Of Corrections Leyte Regional Prison Abuyog, Leyte Section Vii. Technical Specifications Item Specification Statement Of Compliance I The Catering Service Provider Shall Comply With The Government Regulations As Provided In Presidential Decree No. 856 Otherwise Known As “the Code On Sanitation Of The Philippines”. A. Sanitary Permit B. Health Certificate Of Food Handlers C. Quality And Protection Of Food Ii The Catering Service Provider Agrees: A. To Provide Food And Services For The Number Of Participants On The Basis Of The Information Given By The Procuring Entity Thru A Notice Signed By The Coordinator And Service Chief, Atfs Or Her Authorized Representative, At Least Two (2) Days Prior To The Training Schedule. B. During The Training, To Increase/ Decrease The Number Of Meals/ Snacks To Be Served For The Remaining Days Of A Specific Training Schedule, To Take Effect On The Second Day, Provided That Written Notice Is Given By The Procuring Entity Signed By The Coordinator And Service Chief, Atfs Or Her Authorized Representative, Not Later Than 3:00 Pm On The First Day Of The Training. C. During The Training, To Adjust On Any Specific Food/diet Restrictions (religion Or Health Reasons) Of Participants’ Meals To Be Served For The Remaining Days Of A Specific Training Schedule, To Take Effect On The Second Day Provided That Written Notice Is Given By The Procuring Entity Signed By The Coordinator And Service Chief, Atfs Or Her Authorized Representative, Not Later Than 3:00 Pm On The First Day Of The Training. D. To Substitute The Menu For A Specific Training Schedule Due To Justifiable Reasons (unavailability In The Market, Red Tide, Supply And Demand Forces, Tropical Depression, Advisory Of Nonslaughter, Etc.) Provided That Notice Is Given To The Procuring Entity At Least One (1) Day Prior To The Schedule. Provided Further That The Change In The Menu Will Not Change The Unit Cost. E. To Reschedule/cancel The Seminar Due To Fortuitous Event/instances Beyond The Control Of Leyte Regional Prison. F. To Provide The Necessary Clean And/or Sterile Dining Utensils During The Training As Enumerated In But Not Limited To The Following: 1) Glasses; 2) Spoons; 3) Forks; 4) Serving Spoons; 5) Cups; 6) Bowls; 7) Knives; 8) Trays; 9) Pitchers; 10) Glass Rack; 11) Ice Bucket; 12) Food Warmers; 13) Toothpicks; And 14) Condiments. G. To Provide Clean Table Cloth, Seat Covers And Table Napkins In The Designated Dining Area. H. To Assign At Least Two (2) Waiters/ Waitresses In Clean Working Garments Per Class/seminar And Shall Secure An Updated Health Certification From The Medical Health/authorized Officer. I. To Maintain A High Standard Of Sanitation And Cleanliness Of The Dining Area And Its Immediate Surroundings At All Times Adopting The Policy Of “clean As You Go”. Additional Requirements 1 The Lrp Shall Inform The Concessionaire Of The Total Number Of Actual Participants At Least Three (3) Days Before The Conduct Of The Training. 2 The Service Provider Shall Assure The Quality Of Food To Be Served Maintaining High Standards Of Sanitation. In The Event That That The Food Served Has Indication Of Spoilage, The Caterer Shall Be Allowed To Make Substitution Upon The Approval Of The Course Administrator. 3 The Service Provider Shall Submit Or Provide Menu Including Healthy Foods Such As Rice, Beef, Chicken, Pork, Seafoods, Vegetables, Dessert/fruits, Fruit Juice 4 The End User Can Request Specific Meals Or Snacks And Services They Prefer As Long As Requests Remain Within The Allocated Budget Per Meal, Snacks And Services 5 Subject To Increase/decrease Of Participants. 6 The Caterer Shall Serve Consumables Of One (1) Lunch And Two (2) Snacks Per Day Which Shall Be Ready For Inspection By 11:15am, Snacks By 8:45am And 2:30pm, Respectively. 7 The Service Provider Shall Not Require Advance Payment And Deposit To Guarantee Reservation. 8 The Concessionaire Shall Assign At Least Four (4) Waiters/waitresses In Clean Working Garments In Trainings With 50 Or More Participants And At Least 2-3 Waiters/waitresses For Trainings With Less Than Or Equal To 50 Participants. 9 The Lrp Reserves The Right To Cancel/reschedule The Delivery Of Catering Services In Case Of Major Institutional Mandates/changes, Calamities, Etc. Upon Formal Notice To The Caterer At Least Three (3) Days Prior To The Event. 10 The Lrp Shall Pay The Concessionaire At Least Five (5) Days After The Billing Statements Have Been Received By The Office. 11 The Lrp Reserves The Right To Substitute/reschedule Trainings. 12 The Service Provider Shall Provide At Least Two (2) Buffet Tables With Centerpiece For Trainings With Less Than Or Equal To Fifty (50) Participants And At Least Four (4) Buffet Tables Inside The Function Hall For Trainings With More Than Fifty (50) Participants. 13 The Lrp Reserves The Right To Substitute/reschedule Trainings. Rice: A Serving Must Be Provided With Each Meal Viand: Each Meal Should Include One Main Viand Vegetables: A Side Of Vegetables Should Accompany The Meal To Ensure Balanced Nutrition. Desserts Or Sweets: Each Meal Should Include A Dessert Or Any Sweet Treat. Beverage: Participants Should Be Offered Bottled Water/canned Juice/softdrinks. I Hereby Certify That The Statement Of Compliance To The Foregoing Technical Specifications Are True And Correct, Otherwise, If Found To Be False Either During Bid Evaluation Or Post- Qualification, The Same Shall Give Rise To Automatic Disqualification Of Our Bid ___________________________________________ Name Of Company In Print ___________________________________________ Signature Over Printed Name Of Authorized Representative Section Viii. Checklist Of Technical And Financial Documents Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ (d) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And ⬜ (e) Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And ⬜ (f) Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (g) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents ⬜ (h) If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (i) Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (j) Original Of Duly Signed And Accomplished Price Schedule(s). Ix. Bidding Forms Company Letterhead Statement Of Ongoing Government & Private Contracts Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Bid Reference No.: Bid2024-05rb Statement Of All Its Ongoing Government And Or Private Contracts Including Contracts Awarded But Not Yet Started, If Any Whether Similar Or Not Similar In Nature. Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Kind Of Goods Amount Of Contract Value Of Outstanding Contract Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Statement Of Single Largest Completed Contract Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Bid Reference No.: Bid2024-05rb Statement Of Single (1) Largest Completed Contract Of Similar In Nature Within The Last Two (2) Years From The Date Of Submission And Receipt Of Bids Amounting To At Least Fifty Percent (50%) Of The Approved Budget Of The Contract (abc) Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Kind Of Goods Amount Of Contract Amount Of Completed Contracts, Adjusted By The Bidder To Current Prices Using Psa’s Consumer Price Index, If Necessary Date Of Delivery End User’s Acceptance Or Official Receipt(s) Or Sales Invoice Issued For The Contract, (attached Copy) Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Bid Reference No.: Bid2024-05rb Certificate Of Net Financial Contracting Capacity ((please Show Figures At How You Arrived At The Nfcc) This Is To Certify That Our Net Financial Contracting Capacity (nfcc) Is _________________________(p____________) Which Is At Least Equal To The Total Ceiling Price We Are Bidding. The Amount Is Computed As Follows: (please Show Computation Of Nfcc) Nfcc = (ca-cl) (15) – C Where: Ca = Current Assets Cl = Current Liabilities C = Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Going Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project Note: The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Audited Financial Statement Submitted To The Bir. Issued This _______day Of __________2025 _______________________________________________ Name & Signature Of Authorized Representative ____________________ Position _______________ Date Company Letterhead Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Bid Reference No.: Bid2024-05rb Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: Leyte Regional Prison I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. [insert Name Of Bidder’s Authorized Representative] [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ________ And His/her Community Tax Certificate No. _______ Issued On ____ At ______. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Bid Reference No.: Bid2024-05rb Omnibus Sworn Statement Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Of The Leyte Regional Prison As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Of The Leyte Regional Prison, As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid). 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ________ And His/her Community Tax Certificate No. _______ Issued On ____ At ______. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Bid Reference No.: Bid2024-05rb Bid Form Date: Invitation To Bid No: Bid 2024-05rb To: Mr. Tracy B. Soriano, Msca Bac Chairperson Leyte Regional Prison Abuyog, Leyte Gentlemen And/or Ladies: Having Examined The Bidding Documents Including Bid Bulletin Numbers [insert Numbers], The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Offer To Supply & Deliver Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) In Conformity With The Said Bidding Documents For The Sum Of __________________________________________₱ ________ Or Such Other Sums As May Be Ascertained In Accordance With The Schedule Of Prices Attached Herewith And Made Part Of This Bid. We Undertake, If Our Bid Is Accepted, To Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements. If Our Bid Is Accepted, We Undertake To Provide A Performance Security In The Form, Amounts, And Within The Times Specified In The Bidding Documents. Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And Your Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Bid You May Receive. We Certify/confirm That We Comply With The Eligibility Requirements Of The Bidding Documents. I/we Likewise Certify/confirm That The Undersigned, [for Sole Proprietorships, Insert]: As The Owner And Sole Proprietor Or Authorized Representative Of [name Of Bidder], Has The Full Power And Authority To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract, On The Latter’s Behalf For The Supply & Deliver Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid). We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Attached Schedule Of Prices, Shall Be A Ground For The Rejection Of Our Bid. Dated This ________________ Day Of ________________ 20______. [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of ____________________________ Republic Of The Philippines Department Of Justice Bureau Of Corrections Leyte Regional Prison Abuyog, Leyte Schedule Of Prices Supply & Delivery Of Meals & Services For Various Lrp Seminars, Trainings, Workshops, Events, Programs, & Activities For The Year 2025(rebid) Qty. Unit Of Issue Agency Specification Abc Unit Price Total Bid Price Inclusive Of Vat Meals 620 Pax Breakfast ₱62,000.00 620 Pax Lunch ₱93,000.00 620 Pax Dinner ₱93,000.00 Snacks 620 Pax Am Snacks ₱31,000.00 620 Pax Pm Snacks ₱31,000.00 Total Bid Price Inclusive Of Vat In Words The Quantity And Unit Of Issue Is For Bidding Purposes Only. In The Actual Implementation Of The Contract, The Quantity That May Be Required May Increase/decrease As The Need Arises. [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of ____________________________
Closing Date24 Jan 2025
Tender AmountPHP 310 K (USD 5.2 K)
Roads And Highways Department Tender
Civil And Construction...+1Road Construction
Bangladesh
Tender Id: Tender : 30/e-GP/PRD/OTM/Survey/2024-2025 | Installation Of Traffic Sign With Post, Two Stand Sign Board And Reflecting Road Studs Atâ Pirojpur-nazirpur-matibhanga-patgati-gonapara Road (z-7704), Barisal-jhalokathi-bhandaria-pirojpur Road (r-870), Goriarper-banaripara-sarshina-swarupkathi-kawkhali-naikathi Road (pirojpur Portion) (z-8033), Charkhali-tushkhali-mathbaria-pathoghata Road (pirojpur Portion) (r-871) & Pirojpur(hularhat)-sreeramkathi-swarupkathi Road (z-7707) Under Pirojpur Road Division During The Year 2024-2025.
Closing Date11 Feb 2025
Tender AmountRefer Documents
Roads And Highways Department Tender
Civil And Construction...+1Road Construction
Bangladesh
Tender Id: Tender : 29/e-GP/PRD/OTM/Survey/2024-2025 | Feasibility Study From (i) Ch.0+000km. To Ch. 28+860km. Of Pirojpur-nazirpur-matibhanga-patgati-gopalgong Road (z-7704) & Ii) From Ch.0+000km. To Ch. 2+567km. Of Pirojpur-nazirpur-bypass Road (z-7715) Under Pirojpur Road Division During The Year 2024-2025
Closing Date11 Feb 2025
Tender AmountRefer Documents
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Housekeeping Services
United States
Details: Please Refer To Attached Amendment - Vendor Q&a36c24425q0230 0001
section A: Description This Is A Combined Synopsis/solicitation For Commercial Services Prepared In Accordance With The Format In Federal Acquisition Regulation (far) Subpart 12.6, Streamlined Procedures For Evaluation And Solicitation For Commercial Products And Commercial Services, In Conjunction With Far Part 13 As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested, And A Written Solicitation Document Will Not Be Issued. This Solicitation Is Issued As An Rfq, Number 36c24425q0230. The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2025-02 Effective 01/03/2025. The Complete Text Of Any Of The Clauses And Provisions May Be Accessed In Full Text At Far | Acquisition.gov. This Solicitation Is Being Competed On A Full And Open Competitive Basis. The Government Reserves The Right To Make Split Awards As A Result Of This Solicitation. The Associated North American Industrial Classification System (naics) Code For This Procurement Is 812332 Industrial Launders, With A Small Business Size Standard Of $47 Million. The Fsc/psc Is S209 - Housekeeping Laundry/drycleaning. Complete Instructions For Submitting A Response To This Solicitation And Applicable Provisions And Clauses Are Found In 36c24425q0230. All Offerors Are Advised To Pay Careful Attention To The Quote Submission Instructions As There Are Very Specific Instructions As What Is Required To Be Provided. The Contract Period Of Performance (pop) Is Anticipated To Be 03/24/2025 Through 03/23/2030. Should Issuance Of The Award Occur On A Different Date, The Performance Period Will Be Adjusted Accordingly. Any Award Resulting From This Solicitation Will Be Issued On A Standard Form 1449. Note: To Receive An Award Resulting From This Solicitation, Offerors Must Be Registered In The System For Award Management (sam) Database. Registration May Be Done Online At: Www.acquisition.gov Or Www.sam.gov. Section B: Statement Of Work The Pittsburgh, Pa Contracting Office Is Seeking Uniform Rental, Alteration And Laundering Services To Support The Wilkes Barre Va Medical Center, Located At 1111 East End Blvd., Wilkes Barre, Pa 18711. See Attached Statement Of Work (sow) For Complete Details. Section C: Price Schedule All Interested Companies Shall Provide Quotations For The Following: Supplies/services Quantities Listed Are Estimates. While Week Is The Unit Of Measure In This Combined Synopsis, Vendors May Price The Work In Other Industry-wide Acceptable Units, Such As Lbs. Line Item Description Quantity Unit Of Measure Unit Price Total Price 0001 Uniform Supply And Laundry Service In Accordance With Statement Of Work Year 1 52 Wk 1001 Uniform Supply And Laundry Service In Accordance With Statement Of Work Year 2 52 Wk 2001 Uniform Supply And Laundry Service In Accordance With Statement Of Work Year 3 52 Wk 3001 Uniform Supply And Laundry Service In Accordance With Statement Of Work Year 4 52 Wk 4001 Uniform Supply And Laundry Service In Accordance With Statement Of Work Year 5 52 Wk Place Of Performance: Wilkes Barre Va Medical Center 1111 East End Blvd. Wilkes Barre, Pa 18711 Section D: Evaluation Of Quotations The Government Will Select The Quote That Represents The Best Benefit To The Government At A Price That Can Be Determined Reasonable. Specific Information To Be Included In Quotes Is Detailed Below In Instructions To Offerors Commercial Items . Following Receipt Of Quotes, The Government Will Perform A Comparative Evaluation Of The Services Quoted In Accordance With Far 13.106-2(b)(3). The Government Will Compare Quotes To One Another To Select The Quote That Best Benefits The Government By Fulfilling The Requirement. Additional Information Pertaining To Comparative Evaluation Is Below: What Comparative Evaluation Is: It Is The Direct Comparison Of One Quotation/offer With Another In A Uniform And Fair Manner To Determine Which Quote/offer Provides The Government What It Needs, Where And When, As Identified In The Rfq It Is An Assessment Of Which Response Is The Best As A Whole Once One Quotation/offer Is Found Acceptable, It Is Compared Side By Side To The Remaining Ones, And The Best One Is Chosen What Comparative Evaluation Is Not: It Does Not Individually Evaluate Quote/offers Against Specified Evaluation Factors It Does Not Assign A Rating Using A Color, Numerical, Or Other Rating Methodology Although The Process Is Not Prohibited, It Does Not Require Additional Evaluation To Determine If Minimal Advantage Is Worth A Minimal Or Normal Price Difference It Is Not A Low Price Technically Acceptable (lpta) Or Trade-off Process Contractors May Submit More Than One Quote; However, Contractors Are Strongly Encouraged To Submit Their Best Technical Solutions And Prices In Response To This Request For Quote. All Quotes Must Be Submitted By The Deadline To Be Considered For Evaluation. The Government Reserves The Right To Not Select Any Quotes For Award. Additionally, The Government Reserves The Right To Cancel This Solicitation At Any Time Without Making Award. The Contractor Is Responsible For All Quote Preparation Costs, Which, Under No Circumstances, Will Be Paid Or Otherwise Provided For By The Government. Once The Government Determines There Is/are A Contractor(s) That Can Provide A Service That Meet(s) The Requirements Of This Request For Quote, The Government Reserves The Right To Communicate With Only Those Contractors Quoting The Best-suited Service To Address Any Remaining Issues. The Contracting Officer Will Evaluate Technical Capability, Price, And Past Performance. Section E: Clauses And Provisions The Full Text Of Far Provisions Or Clauses May Be Accessed Electronically At Http://acquisition.gov/comp/far/index.html. The Following Solicitation Provisions Apply To This Acquisition: Far 52.212-1, Instructions To Offerors Commercial Products And Commercial Services (sep 2023) Addendum To Far 52.212-1 Instructions To Offerors Commercial Products And Commercial Services Offeror Must Ensure That Proposal Is Submitted Timely To Ensure Delivery And Receipt By The Due Date And Time Identified Herein. Offer Shall Be Submitted Electronically Via Email, To Stephanie.mcfadden@va.gov. In Addition To The Requirements Of Far 52.212-1, Offeror Shall: (a) Complete Provision 52.212-3. Note: An Offeror Needs Only To Complete Paragraph If The Offeror Has Completed The Annual Representations And Certifications Electronically In The System For Award Management Database. Otherwise, Complete Paragraphs (c) Through (o) As Applicable. (b) Offeror Shall Submit A Capability Statement Demonstrating Their Technical Capability And Ability To Meet The Full Scope (all Elements) Of The Statement Of Work. (c) Offeror Shall Submit At Least One Similarly Scoped/relevant Past Performance Reference, Including Both The Reference Information And Details Of The Work Performance; Past Performance Information Shall Be Recent And Relevant Work. Offerors May Submit More Than One Past Performance Reference; Doing So Further Demonstrates The Offeror S Ability To Perform The Work. The Contracting Officer May Also Utilize All Available Records (e.g. Ppiprs And Fapiis) As Well. A Determination Of Contractor Responsibility Will Be Conducted. Provisions That Are Incorporated By Reference (by Citation Number, Title, And Date), Have The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. The Following Provisions Are Incorporated Into 52.212-1 As An Addendum To This Solicitation: 52.252-1 Solicitation Provisions Incorporated By Reference (feb 1998) This Solicitation Incorporates One Or More Solicitation Provisions By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. The Offeror Is Cautioned That The Listed Provisions May Include Blocks That Must Be Completed By The Offeror And Submitted With Its Quotation Or Offer. In Lieu Of Submitting The Full Text Of Those Provisions, The Offeror May Identify The Provision By Paragraph Identifier And Provide The Appropriate Information With Its Quotation Or Offer. Also, The Full Text Of A Solicitation Provision May Be Accessed Electronically At This/these Address(es): Https://www.acquisition.gov/browse/index/far Https://www.va.gov/oal/library/vaar/ (end Of Provision) Far Number Title Date 52.204-7 System For Award Management Nov 2024 52.204-16 Commercial And Government Entity Code Reporting Aug 2020 52.229-11 Tax On Certain Foreign Procurements Notice And Representation Jun 2020 52.204-24 Representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment (nov 2021) The Offeror Shall Not Complete The Representation At Paragraph (d)(1) Of This Provision If The Offeror Has Represented That It Does Not Provide Covered Telecommunications Equipment Or Services As A Part Of Its Offered Products Or Services To The Government In The Performance Of Any Contract, Subcontract, Or Other Contractual Instrument In Paragraph (c)(1) In The Provision At 52.204 26, Covered Telecommunications Equipment Or Services Representation, Or In Paragraph (v)(2)(i) Of The Provision At 52.212 3, Offeror Representations And Certifications Commercial Products And Commercial Services. The Offeror Shall Not Complete The Representation In Paragraph (d)(2) Of This Provision If The Offeror Has Represented That It Does Not Use Covered Telecommunications Equipment Or Services, Or Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services In Paragraph (c)(2) Of The Provision At 52.204 26, Or In Paragraph (v)(2)(ii) Of The Provision At 52.212 3. Definitions. As Used In This Provision Backhaul, Covered Telecommunications Equipment Or Services, Critical Technology, Interconnection Arrangements, Reasonable Inquiry, Roaming, And Substantial Or Essential Component Have The Meanings Provided In The Clause 52.204 25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (b) Prohibition. (1) Section 889(a)(1)(a) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115 232) Prohibits The Head Of An Executive Agency On Or After August 13, 2019, From Procuring Or Obtaining, Or Extending Or Renewing A Contract To Procure Or Obtain, Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. Nothing In The Prohibition Shall Be Construed To (i) Prohibit The Head Of An Executive Agency From Procuring With An Entity To Provide A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or (ii) Cover Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Cannot Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles. (2) Section 889(a)(1)(b) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115 232) Prohibits The Head Of An Executive Agency On Or After August 13, 2020, From Entering Into A Contract Or Extending Or Renewing A Contract With An Entity That Uses Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. This Prohibition Applies To The Use Of Covered Telecommunications Equipment Or Services, Regardless Of Whether That Use Is In Performance Of Work Under A Federal Contract. Nothing In The Prohibition Shall Be Construed To (i) Prohibit The Head Of An Executive Agency From Procuring With An Entity To Provide A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or (ii) Cover Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Cannot Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles. (c) Procedures. The Offeror Shall Review The List Of Excluded Parties In The System For Award Management (sam) (https://www.sam.gov) For Entities Excluded From Receiving Federal Awards For Covered Telecommunications Equipment Or Services. (d) Representations. The Offeror Represents That (1) It [ ] Will, [ ] Will Not Provide Covered Telecommunications Equipment Or Services To The Government In The Performance Of Any Contract, Subcontract Or Other Contractual Instrument Resulting From This Solicitation. The Offeror Shall Provide The Additional Disclosure Information Required At Paragraph (e)(1) Of This Section If The Offeror Responds Will In Paragraph (d)(1) Of This Section; And (2) After Conducting A Reasonable Inquiry, For Purposes Of This Representation, The Offeror Represents That It [ ] Does, [ ] Does Not Use Covered Telecommunications Equipment Or Services, Or Use Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services. The Offeror Shall Provide The Additional Disclosure Information Required At Paragraph (e)(2) Of This Section If The Offeror Responds Does In Paragraph (d)(2) Of This Section. (e) Disclosures. (1) Disclosure For The Representation In Paragraph (d)(1) Of This Provision. If The Offeror Has Responded Will In The Representation In Paragraph (d)(1) Of This Provision, The Offeror Shall Provide The Following Information As Part Of The Offer: (i) For Covered Equipment (a) The Entity That Produced The Covered Telecommunications Equipment (include Entity Name, Unique Entity Identifier, Cage Code, And Whether The Entity Was The Original Equipment Manufacturer (oem) Or A Distributor, If Known); (b) A Description Of All Covered Telecommunications Equipment Offered (include Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); And (c) Explanation Of The Proposed Use Of Covered Telecommunications Equipment And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(1) Of This Provision. (ii) For Covered Services (a) If The Service Is Related To Item Maintenance: A Description Of All Covered Telecommunications Services Offered (include On The Item Being Maintained: Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); Or (b) If Not Associated With Maintenance, The Product Service Code (psc) Of The Service Being Provided; And Explanation Of The Proposed Use Of Covered Telecommunications Services And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(1) Of This Provision. (2) Disclosure For The Representation In Paragraph (d)(2) Of This Provision. If The Offeror Has Responded Does In The Representation In Paragraph (d)(2) Of This Provision, The Offeror Shall Provide The Following Information As Part Of The Offer: (i) For Covered Equipment (a) The Entity That Produced The Covered Telecommunications Equipment (include Entity Name, Unique Entity Identifier, Cage Code, And Whether The Entity Was The Oem Or A Distributor, If Known); (b) A Description Of All Covered Telecommunications Equipment Offered (include Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); And (c) Explanation Of The Proposed Use Of Covered Telecommunications Equipment And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(2) Of This Provision. (ii) For Covered Services (a) If The Service Is Related To Item Maintenance: A Description Of All Covered Telecommunications Services Offered (include On The Item Being Maintained: Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); Or (b) If Not Associated With Maintenance, The Psc Of The Service Being Provided; And Explanation Of The Proposed Use Of Covered Telecommunications Services And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(2) Of This Provision. (end Of Provision) 52.204-26 Covered Telecommunications Equipment Or Services Representation (oct 2020) (a) Definitions. As Used In This Provision, Covered Telecommunications Equipment Or Services And Reasonable Inquiry Have The Meaning Provided In The Clause 52.204-25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (b) Procedures. The Offeror Shall Review The List Of Excluded Parties In The System For Award Management (sam) (https://www.sam.gov) For Entities Excluded From Receiving Federal Awards For Covered Telecommunications Equipment Or Services . (c) Representations. (1) The Offeror Represents That It [ ] Does, [ ] Does Not Provide Covered Telecommunications Equipment Or Services As A Part Of Its Offered Products Or Services To The Government In The Performance Of Any Contract, Subcontract, Or Other Contractual Instrument. (2) After Conducting A Reasonable Inquiry For Purposes Of This Representation, The Offeror Represents That It [ ] Does, [ ] Does Not Use Covered Telecommunications Equipment Or Services, Or Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services. (end Of Provision) 52.204-29 Federal Acquisition Supply Chain Security Act Orders Representation And Disclosures (dec 2023) (a) Definitions. As Used In This Provision, Covered Article, Fascsa Order, Intelligence Community, National Security System, Reasonable Inquiry, Sensitive Compartmented Information, Sensitive Compartmented Information System, And Source Have The Meaning Provided In The Clause 52.204 30, Federal Acquisition Supply Chain Security Act Orders Prohibition. (b) Prohibition. Contractors Are Prohibited From Providing Or Using As Part Of The Performance Of The Contract Any Covered Article, Or Any Products Or Services Produced Or Provided By A Source, If The Prohibition Is Set Out In An Applicable Federal Acquisition Supply Chain Security Act (fascsa) Order, As Described In Paragraph (b)(1) Of Far 52.204 30, Federal Acquisition Supply Chain Security Act Orders Prohibition. (c) Procedures. (1) The Offeror Shall Search For The Phrase Fascsa Order In The System For Award Management (sam)(https://www.sam.gov) For Any Covered Article, Or Any Products Or Services Produced Or Provided By A Source, If There Is An Applicable Fascsa Order Described In Paragraph (b)(1) Of Far 52.204 30, Federal Acquisition Supply Chain Security Act Orders Prohibition. (2) The Offeror Shall Review The Solicitation For Any Fascsa Orders That Are Not In Sam, But Are Effective And Do Apply To The Solicitation And Resultant Contract (see Far 4.2303(c)(2)). (3) Fascsa Orders Issued After The Date Of Solicitation Do Not Apply Unless Added By An Amendment To The Solicitation. (d) Representation. By Submission Of This Offer, The Offeror Represents That It Has Conducted A Reasonable Inquiry, And That The Offeror Does Not Propose To Provide Or Use In Response To This Solicitation Any Covered Article, Or Any Products Or Services Produced Or Provided By A Source, If The Covered Article Or The Source Is Prohibited By An Applicable Fascsa Order In Effect On The Date The Solicitation Was Issued, Except As Waived By The Solicitation, Or As Disclosed In Paragraph (e). (e) Disclosures. The Purpose For This Disclosure Is So The Government May Decide Whether To Issue A Waiver. For Any Covered Article, Or Any Products Or Services Produced Or Provided By A Source, If The Covered Article Or The Source Is Subject To An Applicable Fascsa Order, And The Offeror Is Unable To Represent Compliance, Then The Offeror Shall Provide The Following Information As Part Of The Offer: (1) Name Of The Product Or Service Provided To The Government; (2) Name Of The Covered Article Or Source Subject To A Fascsa Order; (3) If Applicable, Name Of The Vendor, Including The Commercial And Government Entity Code And Unique Entity Identifier (if Known), That Supplied The Covered Article Or The Product Or Service To The Offeror; (4) Brand; (5) Model Number (original Equipment Manufacturer Number, Manufacturer Part Number, Or Wholesaler Number); (6) Item Description; (7) Reason Why The Applicable Covered Article Or The Product Or Service Is Being Provided Or Used; (f) Executive Agency Review Of Disclosures. The Contracting Officer Will Review Disclosures Provided In Paragraph (e) To Determine If Any Waiver May Be Sought. A Contracting Officer May Choose Not To Pursue A Waiver For Covered Articles Or Sources Otherwise Subject To A Fascsa Order And May Instead Make An Award To An Offeror That Does Not Require A Waiver. (end Of Provision) 52.216-1 Type Of Contract (apr 1984) The Government Contemplates Award Of A Firm-fixed-price, Indefinite Quantity Contract Resulting From This Solicitation. (end Of Provision) (end Of Addendum To 52.212-1) 52.212-2 Evaluation Commercial Products And Commercial Services (nov 2021) (a) The Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. The Following Factors Shall Be Used To Evaluate Offers: 1) Technical Capability 2) Past Performance 3) Price (b) Evaluation Approach. The Government Will Evaluate Quotations Using The Comparative Evaluation Process Outlined In Far 13.106-2 (b) (3), Where Quotations Will Be Compared To One Another To Determine Which Provides The Best Benefit To The Government. The Government Reserves The Right To Consider A Quotation Other Than The Lowest Price That Provides Additional Benefit(s). Quotations May Exceed Minimum Requirements Of The Solicitation. The Government Reserves The Right To Select A Quotation That Provides Benefit To The Government That Exceeds The Minimum Requirements Of The Solicitation But Is Not Required To Do So. Each Response Must Meet The Minimum Requirements Of The Solicitation. The Government Is Not Requesting Or Accepting Alternate Quotations. The Evaluation Will Consider The Following: 1) Technical Capability: The Quotation Will Be Evaluated To The Extent To Which It Can Meet And/or Exceed The Government S Requirements As Outlined In The Solicitation And Based On The Information Requested In The Instructions To Quoters Section Of The Solicitation. Please Provide An Explanation Of Your Firm S Ability To Meet And/or Exceed The Technical Aspects Of This Solicitation. 2) Past Performance: Offerors Shall Provide At Least One Relevant Past Performance Reference. The Past Performance Evaluation Will Assess The Relative Risks Associated With A Quoter S Likelihood Of Success In Fulfilling The Solicitation S Requirements As Indicated By The Quoter S Record Of Past Performance. The Past Performance Evaluation May Be Based On The Contracting Officer S Knowledge Of And Previous Experience With The Supply Or Service Being Acquired; Customer Surveys, And Past Performance Questionnaire Replies; Contractor Performance Assessment Reporting System (cpars) At Http://www.cpars.gov/; Or Any Other Reasonable Basis. 3) Price: The Government Will Evaluate The Price By Adding The Total Of All Line-item Prices. The Total Evaluated Price Will Be That Sum. (c) A Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer's Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award. (c) A Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer's Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award. (end Of Provision) Representations And Certifications Electronically Via The System For Award Management (sam) Website Located At Https://www.sam.gov/portal In Accordance With Far 52.212-3, Offerors Representations And Certifications Commercial Products And Commercial Services. If Paragraph (j) Of The Provision Is Applicable, A Written Submission Is Required. The Following Contract Clauses Apply To This Acquisition: Far 52.212-4, Contract Terms And Conditions Commercial Products And Commercial Services (nov 2023) Addendum To Far 52.212-4 Contract Terms And Conditions Commercial Products And Commercial Services Clauses That Are Incorporated By Reference (by Citation Number, Title, And Date), Have The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. The Following Clauses Are Incorporated Into 52.212-4 As An Addendum To This Contract: 52.252-2 Clauses Incorporated By Reference (feb 1998) This Contract Incorporates One Or More Clauses By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. Also, The Full Text Of A Clause May Be Accessed Electronically At This/these Address(es): Https://www.acquisition.gov/browse/index/far Https://www.va.gov/oal/library/vaar/ (end Of Clause) Far Number Title Date 52.204-13 System For Award Management Maintenance Oct 2018 52.204-18 Commercial And Government Entity Code Maintenance Aug 2020 52.223-2 Reporting Of Biobased Products Under Service And Construction Contracts May 2024 52.237-3 Continuity Of Services Jan 1991 52.216-18 Ordering (aug 2020) (a) Any Supplies And Services To Be Furnished Under This Contract Shall Be Ordered By Issuance Of Delivery Orders Or Task Orders By The Individuals Or Activities Designated In The Schedule. Such Orders May Be Issued From 03/24/2025 Through 03/23/2030. (b) All Delivery Orders Or Task Orders Are Subject To The Terms And Conditions Of This Contract. In The Event Of Conflict Between A Delivery Order Or Task Order And This Contract, The Contract Shall Control. (c) A Delivery Order Or Task Order Is Considered "issued" When (1) If Sent By Mail (includes Transmittal By U.s. Mail Or Private Delivery Service), The Government Deposits The Order In The Mail; (2) If Sent By Fax, The Government Transmits The Order To The Contractor S Fax Number; Or (3) If Sent Electronically, The Government Either (i) Posts A Copy Of The Delivery Order Or Task Order To A Government Document Access System, And Notice Is Sent To The Contractor; Or (ii) Distributes The Delivery Order Or Task Order Via Email To The Contractor S Email Address. (d) Orders May Be Issued By Methods Other Than Those Enumerated In This Clause Only If Authorized In The Contract. (end Of Clause) 52.216-19 Order Limitations (oct 1995) (a) Minimum Order. When The Government Requires Supplies Or Services Covered By This Contract In An Amount Of Less Than $2,500.00, The Government Is Not Obligated To Purchase, Nor Is The Contractor Obligated To Furnish, Those Supplies Or Services Under The Contract. (b) Maximum Order. The Contractor Is Not Obligated To Honor (1) Any Order For A Single Item In Excess Of To Be Determined At Award; (2) Any Order For A Combination Of Items In Excess Of To Be Determined At Award; Or (3) A Series Of Orders From The Same Ordering Office Within 10 Days That Together Call For Quantities Exceeding The Limitation In Paragraph (b)(1) Or (2) Of This Section. (c) If This Is A Requirements Contract (i.e., Includes The Requirements Clause At Subsection 52.216-21 Of The Federal Acquisition Regulation (far)), The Government Is Not Required To Order A Part Of Any One Requirement From The Contractor If That Requirement Exceeds The Maximum-order Limitations In Paragraph (b) Of This Section. (d) Notwithstanding Paragraphs (b) And (c) Of This Section, The Contractor Shall Honor Any Order Exceeding The Maximum Order Limitations In Paragraph (b), Unless That Order (or Orders) Is Returned To The Ordering Office Within 5 Days After Issuance, With Written Notice Stating The Contractor's Intent Not To Ship The Item (or Items) Called For And The Reasons. Upon Receiving This Notice, The Government May Acquire The Supplies Or Services From Another Source. (end Of Clause) 52.216-21 Requirements (oct 1995) (a) This Is A Requirements Contract For The Supplies Or Services Specified, And Effective For The Period Stated, In The Schedule. The Quantities Of Supplies Or Services Specified In The Schedule Are Estimates Only And Are Not Purchased By This Contract. Except As This Contract May Otherwise Provide, If The Government's Requirements Do Not Result In Orders In The Quantities Described As "estimated" Or "maximum" In The Schedule, That Fact Shall Not Constitute The Basis For An Equitable Price Adjustment. (b) Delivery Or Performance Shall Be Made Only As Authorized By Orders Issued In Accordance With The Ordering Clause. Subject To Any Limitations In The Order Limitations Clause Or Elsewhere In This Contract, The Contractor Shall Furnish To The Government All Supplies Or Services Specified In The Schedule And Called For By Orders Issued In Accordance With The Ordering Clause. The Government May Issue Orders Requiring Delivery To Multiple Destinations Or Performance At Multiple Locations. (c) Except As This Contract Otherwise Provides, The Government Shall Order From The Contractor All The Supplies Or Services Specified In The Schedule That Are Required To Be Purchased By The Government Activity Or Activities Specified In The Schedule. (d) The Government Is Not Required To Purchase From The Contractor Requirements In Excess Of Any Limit On Total Orders Under This Contract. (e) If The Government Urgently Requires Delivery Of Any Quantity Of An Item Before The Earliest Date That Delivery May Be Specified Under This Contract, And If The Contractor Will Not Accept An Order Providing For The Accelerated Delivery, The Government May Acquire The Urgently Required Goods Or Services From Another Source. (f) Any Order Issued During The Effective Period Of This Contract And Not Completed Within That Period Shall Be Completed By The Contractor Within The Time Specified In The Order. The Contract Shall Govern The Contractor's And Government's Rights And Obligations With Respect To That Order To The Same Extent As If The Order Were Completed During The Contract's Effective Period; Provided, That The Contractor Shall Not Be Required To Make Any Deliveries Under This Contract After 03/23/2030. (end Of Clause) 52.216-22 Indefinite Quantity (oct 1995) (a) This Is An Indefinite-quantity Contract For The Supplies Or Services Specified, And Effective For The Period Stated, In The Schedule. The Quantities Of Supplies And Services Specified In The Schedule Are Estimates Only And Are Not Purchased By This Contract. (b) Delivery Or Performance Shall Be Made Only As Authorized By Orders Issued In Accordance With The Ordering Clause. The Contractor Shall Furnish To The Government, When And If Ordered, The Supplies Or Services Specified In The Schedule Up To And Including The Quantity Designated In The Schedule As The "maximum." The Government Shall Order At Least The Quantity Of Supplies Or Services Designated In The Schedule As The "minimum." (c) Except For Any Limitations On Quantities In The Order Limitations Clause Or In The Schedule, There Is No Limit On The Number Of Orders That May Be Issued. The Government May Issue Orders Requiring Delivery To Multiple Destinations Or Performance At Multiple Locations. (d) Any Order Issued During The Effective Period Of This Contract And Not Completed Within That Period Shall Be Completed By The Contractor Within The Time Specified In The Order. The Contract Shall Govern The Contractor's And Government's Rights And Obligations With Respect To That Order To The Same Extent As If The Order Were Completed During The Contract's Effective Period; Provided, That The Contractor Shall Not Be Required To Make Any Deliveries Under This Contract After 03/23/2030. (end Of Clause) Vaar 852.203-70 Commercial Advertising (may 2018) The Contractor Shall Not Make Reference In Its Commercial Advertising To Department Of Veterans Affairs Contracts In A Manner That States Or Implies The Department Of Veterans Affairs Approves Or Endorses The Contractor S Products Or Services Or Considers The Contractor S Products Or Services Superior To Other Products Or Services. (end Of Clause) Vaar 852.232-72 Electronic Submission Of Payment Requests (nov 2018) (a) Definitions. As Used In This Clause (1) Contract Financing Payment Has The Meaning Given In Far 32.001; (2) Designated Agency Office Means The Office Designated By The Purchase Order, Agreement, Or Contract To First Receive And Review Invoices. This Office Can Be Contractually Designated As The Receiving Entity. This Office May Be Different From The Office Issuing The Payment; (3) Electronic Form Means An Automated System Transmitting Information Electronically According To The Accepted Electronic Data Transmission Methods And Formats Identified In Paragraph (c) Of This Clause. Facsimile, Email, And Scanned Documents Are Not Acceptable Electronic Forms For Submission Of Payment Requests; (4) Invoice Payment Has The Meaning Given In Far 32.001; And (5) Payment Request Means Any Request For Contract Financing Payment Or Invoice Payment Submitted By The Contractor Under This Contract. (b) Electronic Payment Requests. Except As Provided In Paragraph (e) Of This Clause, The Contractor Shall Submit Payment Requests In Electronic Form. Purchases Paid With A Government-wide Commercial Purchase Card Are Considered To Be An Electronic Transaction For Purposes Of This Rule, And Therefore No Additional Electronic Invoice Submission Is Required. (c) Data Transmission. A Contractor Must Ensure That The Data Transmission Method And Format Are Through One Of The Following: (1) Va S Electronic Invoice Presentment And Payment System At The Current Website Address Provided In The Contract. (2) Any System That Conforms To The X12 Electronic Data Interchange (edi) Formats Established By The Accredited Standards Center (asc) And Chartered By The American National Standards Institute (ansi). (d) Invoice Requirements. Invoices Shall Comply With Far 32.905. (e) Exceptions. If, Based On One Of The Circumstances In This Paragraph (e), The Contracting Officer Directs That Payment Requests Be Made By Mail, The Contractor Shall Submit Payment Requests By Mail Through The United States Postal Service To The Designated Agency Office. Submission Of Payment Requests By Mail May Be Required For (1) Awards Made To Foreign Vendors For Work Performed Outside The United States; (2) Classified Contracts Or Purchases When Electronic Submission And Processing Of Payment Requests Could Compromise The Safeguarding Of Classified Or Privacy Information; (3) Contracts Awarded By Contracting Officers In The Conduct Of Emergency Operations, Such As Responses To National Emergencies; (4) Solicitations Or Contracts In Which The Designated Agency Office Is A Va Entity Other Than The Va Financial Services Center In Austin, Texas; Or (5) Solicitations Or Contracts In Which The Va Designated Agency Office Does Not Have Electronic Invoicing Capability As Described Above. (end Of Clause) Vaar 852.242-71 Administrative Contracting Officer (oct 2020) The Contracting Officer Reserves The Right To Designate An Administrative Contracting Officer (aco) For The Purpose Of Performing Certain Tasks/duties In The Administration Of The Contract. Such Designation Will Be In Writing Through An Aco Letter Of Delegation And Will Identify The Responsibilities And Limitations Of The Aco. A Copy Of The Aco Letter Of Delegation Will Be Furnished To The Contractor. (end Of Clause) (end Of Addendum To 52.212-4) 52.212-5 Contract Terms And Conditions Required To Implement Statutes Or Executive Orders Commercial Products And Commercial Services (nov 2024) (a) The Contractor Shall Comply With The Following Federal Acquisition Regulation (far) Clauses, Which Are Incorporated In This Contract By Reference, To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services: (1) 52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (2) 52.204 23, Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities (dec 2023) (section 1634 Of Pub. L. 115 91). (3) 52.204 25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (nov 2021) (section 889(a)(1)(a) Of Pub. L. 115 232). (4) 52.209-10, Prohibition On Contracting With Inverted Domestic Corporations (nov 2015). (5) 52.232 40, Providing Accelerated Payments To Small Business Subcontractors (mar 2023) (31 U.s.c. 3903 And 10 U.s.c. 3801). (6) 52.233-3, Protest After Award (aug 1996) (31 U.s.c. 3553). (7) 52.233-4, Applicable Law For Breach Of Contract Claim (oct 2004) (public Laws 108-77 And 108-78 (19 U.s.c. 3805 Note)). (b) The Contractor Shall Comply With The Far Clauses In This Paragraph (b) That The Contracting Officer Has Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services: [] (1) 52.203 6, Restrictions On Subcontractor Sales To The Government (jun 2020), With Alternate I (nov 2021) (41 U.s.c. 4704 And 10 U.s.c. 4655). [] (2) 52.203 13, Contractor Code Of Business Ethics And Conduct (nov 2021) (41 U.s.c. 3509). [] (3) 52.203 15, Whistleblower Protections Under The American Recovery And Reinvestment Act Of 2009 (jun 2010) (section 1553 Of Pub. L. 111-5). (applies To Contracts Funded By The American Recovery And Reinvestment Act Of 2009.) [x] (4) 52.203 17, Contractor Employee Whistleblower Rights (nov 2023) (41 U.s.c. 4712); This Clause Does Not Apply To Contracts Of Dod, Nasa, The Coast Guard, Or Applicable Elements Of The Intelligence Community See Far 3.900(a). [x] (5) 52.204 10, Reporting Executive Compensation And First-tier Subcontract Awards (jun 2020) (pub. L. 109 282) (31 U.s.c. 6101 Note). [] (6) [reserved] [] (7) 52.204 14, Service Contract Reporting Requirements (oct 2016) (pub. L. 111 117, Section 743 Of Div. C). [] (8) 52.204 15, Service Contract Reporting Requirements For Indefinite-delivery Contracts (oct 2016) (pub. L. 111 117, Section 743 Of Div. C). [x] (9) 52.204 27, Prohibition On A Bytedance Covered Application (jun 2023) (section 102 Of Division R Of Pub. L. 117 328). [] (10) 52.204 28, Federal Acquisition Supply Chain Security Act Orders Federal Supply Schedules, Governmentwide Acquisition Contracts, And Multi-agency Contracts. (dec 2023) (pub. L. 115 390, Title Ii). [x] (11)(i) 52.204 30, Federal Acquisition Supply Chain Security Act Orders Prohibition. (dec 2023) (pub. L. 115 390, Title Ii). [] (ii) Alternate I (dec 2023) Of 52.204 30. [x] (12) 52.209 6, Protecting The Government S Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment. (nov 2021) (31 U.s.c. 6101 Note). [] (13) 52.209-9, Updates Of Publicly Available Information Regarding Responsibility Matters (oct 2018) (41 U.s.c. 2313). [] (14) [reserved] [] (15) 52.219 3, Notice Of Hubzone Set-aside Or Sole-source Award (oct 2022) (15 U.s.c. 657a). [x] (16) 52.219 4, Notice Of Price Evaluation Preference For Hubzone Small Business Concerns (oct 2022) (if The Offeror Elects To Waive The Preference, It Shall So Indicate In Its Offer) (15 U.s.c. 657a). [] (17) [reserved] [] (18)(i) 52.219-6, Notice Of Total Small Business Set-aside (nov 2020) (15 U.s.c. 644). [] (ii) Alternate I (mar 2020) Of 52.219-6. [] (19)(i) 52.219-7, Notice Of Partial Small Business Set-aside (nov 2020) (15 U.s.c. 644). [] (ii) Alternate I (mar 2020) Of 52.219-7. [] (20) 52.219-8, Utilization Of Small Business Concerns (feb 2024) (15 U.s.c. 637(d)(2) And (3)). [] (21)(i) 52.219 9, Small Business Subcontracting Plan (sep 2023) (15 U.s.c. 637(d)(4)). [] (ii) Alternate I (nov 2016) Of 52.219-9. [] (iii) Alternate Ii (nov 2016) Of 52.219-9. [] (iv) Alternate Iii (jun 2020) Of 52.219 9. [] (v) Alternate Iv (sep 2023) Of 52.219 9. [] (22)(i) 52.219-13, Notice Of Set-aside Of Orders (mar 2020) (15 U.s.c. 644(r)). [] (ii) Alternate I (mar 2020) Of 52.219-13. [] (23) 52.219 14, Limitations On Subcontracting (oct 2022) (15 U.s.c. 657s). [] (24) 52.219-16, Liquidated Damages Subcontracting Plan (sep 2021) (15 U.s.c. 637(d)(4)(f)(i)). [] (25) 52.219 27, Notice Of Set-aside For, Or Sole-source Award To, Service-disabled Veteran-owned Small Business (sdvosb) Concerns Eligible Under The Sdvosb Program (feb 2024) (15 U.s.c. 657f). [x] (26) (i) 52.219 28, Post-award Small Business Program Representation (feb 2024) (15 U.s.c. 632(a)(2)). [] (ii) Alternate I (mar 2020) Of 52.219 28. [] (27) 52.219 29, Notice Of Set-aside For, Or Sole-source Award To, Economically Disadvantaged Women-owned Small Business Concerns (oct 2022) (15 U.s.c. 637(m)). [] (28) 52.219 30, Notice Of Set-aside For, Or Sole-source Award To, Women-owned Small Business Concerns Eligible Under The Women-owned Small Business Program (oct 2022) (15 U.s.c. 637(m)). [] (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (mar 2020) (15 U.s.c. 644(r)). [] (30) 52.219 33, Nonmanufacturer Rule (sep 2021) (15 U.s.c. 657s). [x] (31) 52.222-3, Convict Labor (jun 2003) (e.o. 11755). [] (32) 52.222 19, Child Labor Cooperation With Authorities And Remedies (feb 2024) (e.o. 13126). [x] (33) 52.222-21, Prohibition Of Segregated Facilities (apr 2015). [x] (34)(i) 52.222 26, Equal Opportunity (sep 2016) (e.o. 11246). [] (ii) Alternate I (feb 1999) Of 52.222-26. [x] (35)(i) 52.222 35, Equal Opportunity For Veterans (jun 2020) (38 U.s.c. 4212). [] (ii) Alternate I (jul 2014) Of 52.222-35. [x] (36)(i) 52.222 36, Equal Opportunity For Workers With Disabilities (jun 2020) (29 U.s.c. 793). [] (ii) Alternate I (jul 2014) Of 52.222-36. [x] (37) 52.222 37, Employment Reports On Veterans (jun 2020) (38 U.s.c. 4212). [] (38) 52.222-40, Notification Of Employee Rights Under The National Labor Relations Act (dec 2010) (e.o. 13496). [x] (39)(i) 52.222-50, Combating Trafficking In Persons (nov 2021) (22 U.s.c. Chapter 78 And E.o. 13627). [] (ii) Alternate I (mar 2015) Of 52.222-50 (22 U.s.c. Chapter 78 And E.o. 13627). [x] (40) 52.222-54, Employment Eligibility Verification (may 2022). (e. O. 12989). (not Applicable To The Acquisition Of Commercially Available Off-the-shelf Items Or Certain Other Types Of Commercial Products Or Commercial Services As Prescribed In Far 22.1803.) [] (41)(i) 52.223-9, Estimate Of Percentage Of Recovered Material Content For Epa-designated Items (may 2008) (42 U.s.c.6962(c)(3)(a)(ii)). (not Applicable To The Acquisition Of Commercially Available Off-the-shelf Items.) [] (ii) Alternate I (may 2008) Of 52.223-9 (42 U.s.c. 6962(i)(2)(c)). (not Applicable To The Acquisition Of Commercially Available Off-the-shelf Items.) [] (42) 52.223-11, Ozone-depleting Substances And High Global Warming Potential Hydrofluorocarbons (may 2024) (42 U.s.c. 7671, Et Seq.). [] (43) 52.223-12, Maintenance, Service, Repair, Or Disposal Of Refrigeration Equipment And Air Conditioners (may 2024) (42 U.s.c. 7671, Et Seq.). [] (44) 52.223-20, Aerosols. (may 2024) (42 U.s.c. 7671, Et Seq.). [] (45) 52.223-21, Foams (may 2024). (42 U.s.c. 7671, Et Seq.). [x] (46) 52.223-23, Sustainable Products And Services (may 2024) (e.o. 14057, 7 U.s.c. 8102, 42 U.s.c. 6962, 42 U.s.c. 8259b, And 42 U.s.c. 7671i). [] (47)(i) 52.224-3, Privacy Training (jan 2017) (5 U.s.c. 552a). [] (ii) Alternate I (jan 2017) Of 52.224-3. [] (48)(i) 52.225-1, Buy American Supplies (oct 2022) (41 U.s.c. Chapter 83). [] (ii) Alternate I (oct 2022) Of 52.225-1. [x] (49)(i) 52.225-3, Buy American Free Trade Agreements Israeli Trade Act (nov 2023) (19 U.s.c. 3301 Note, 19 U.s.c. 2112 Note, 19 U.s.c. 3805 Note, 19 U.s.c. 4001 Note, 19 U.s.c. Chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, And 112-43. [] (ii) Alternate I [reserved]. [] (iii) Alternate Ii (dec 2022) Of 52.225-3. [] (iv) Alternate Iii (feb 2024) Of 52.225-3. [] (v) Alternate Iv (oct 2022) Of 52.225-3. [] (50) 52.225 5, Trade Agreements (nov 2023) (19 U.s.c. 2501, Et Seq., 19 U.s.c. 3301 Note [x] (51) 52.225-13, Restrictions On Certain Foreign Purchases (feb 2021) (e.o.'s, Proclamations, And Statutes Administered By The Office Of Foreign Assets Control Of The Department Of The Treasury). [] (52) 52.225 26, Contractors Performing Private Security Functions Outside The United States (oct 2016) (section 862, As Amended, Of The National Defense Authorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). [] (53) 52.226-4, Notice Of Disaster Or Emergency Area Set-aside (nov 2007) (42 U.s.c. 5150). [] (54) 52.226-5, Restrictions On Subcontracting Outside Disaster Or Emergency Area (nov 2007) (42 U.s.c. 5150). [x] (55) 52.226-8, Encouraging Contractor Policies To Ban Text Messaging While Driving (may 2024) (e.o. 13513) [x] (56) 52.229 12, Tax On Certain Foreign Procurements (feb 2021). [] (57) 52.232-29, Terms For Financing Of Purchases Of Commercial Products And Commercial Services (nov 2021) (41 U.s.c. 4505, 10 U.s.c. 3805). [] (58) 52.232-30, Installment Payments For Commercial Products And Commercial Services (nov 2021) (41 U.s.c. 4505, 10 U.s.c. 3805). [x] (59) 52.232-33, Payment By Electronic Funds Transfer System For Award Management (oct 2018) (31 U.s.c. 3332). [] (60) 52.232-34, Payment By Electronic Funds Transfer Other Than System For Award Management (jul 2013) (31 U.s.c. 3332). [] (61) 52.232-36, Payment By Third Party (may 2014) (31 U.s.c. 3332). [] (62) 52.239-1, Privacy Or Security Safeguards (aug 1996) (5 U.s.c. 552a). [x] (63) 52.240 1, Prohibition On Unmanned Aircraft Systems Manufactured Or Assembled By American Security Drone Act Covered Foreign Entities (nov 2024) (sections 1821 1826, Pub. L. 118 31, 41 U.s.c. 3901 Note Prec.). [] (64) 52.242-5, Payments To Small Business Subcontractors (jan 2017)(15 U.s.c. 637(d)(13)). [] (65)(i) 52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels (nov 2021) (46 U.s.c. 55305 And 10 U.s.c. 2631). [] (ii) Alternate I (apr 2003) Of 52.247-64. [] (iii) Alternate Ii (nov 2021) Of 52.247-64. (c) The Contractor Shall Comply With The Far Clauses In This Paragraph (c), Applicable To Commercial Services, That The Contracting Officer Has Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services: [x] (1) 52.222-41, Service Contract Labor Standards (aug 2018) (41 U.s.c. Chapter 67). [x] (2) 52.222-42, Statement Of Equivalent Rates For Federal Hires (may 2014) (29 U.s.c. 206 And 41 U.s.c. Chapter 67). Employee Class Monetary Wage-fringe Benefits [x] (3) 52.222-43, Fair Labor Standards Act And Service Contract Labor Standards Price Adjustment (multiple Year And Option Contracts) (aug 2018) (29 U.s.c. 206 And 41 U.s.c. Chapter 67). [] (4) 52.222-44, Fair Labor Standards Act And Service Contract Labor Standards Price Adjustment (may 2014) (29 U.s.c 206 And 41 U.s.c. Chapter 67). [] (5) 52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment Requirements (may 2014) (41 U.s.c. Chapter 67). [] (6) 52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services Requirements (may 2014) (41 U.s.c. Chapter 67). [x] (7) 52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026 (jan 2022). [x] (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (jan 2022) (e.o. 13706). [] (9) 52.226 6, Promoting Excess Food Donation To Nonprofit Organizations (jun 2020) (42 U.s.c. 1792). (d) Comptroller General Examination Of Record. The Contractor Shall Comply With The Provisions Of This Paragraph (d) If This Contract Was Awarded Using Other Than Sealed Bid, Is In Excess Of The Simplified Acquisition Threshold, As Defined In Far 2.101, On The Date Of Award Of This Contract, And Does Not Contain The Clause At 52.215-2, Audit And Records Negotiation. (1) The Comptroller General Of The United States, Or An Authorized Representative Of The Comptroller General, Shall Have Access To And Right To Examine Any Of The Contractor's Directly Pertinent Records Involving Transactions Related To This Contract. (2) The Contractor Shall Make Available At Its Offices At All Reasonable Times The Records, Materials, And Other Evidence For Examination, Audit, Or Reproduction, Until 3 Years After Final Payment Under This Contract Or For Any Shorter Period Specified In Far Subpart 4.7, Contractor Records Retention, Of The Other Clauses Of This Contract. If This Contract Is Completely Or Partially Terminated, The Records Relating To The Work Terminated Shall Be Made Available For 3 Years After Any Resulting Final Termination Settlement. Records Relating To Appeals Under The Disputes Clause Or To Litigation Or The Settlement Of Claims Arising Under Or Relating To This Contract Shall Be Made Available Until Such Appeals, Litigation, Or Claims Are Finally Resolved. (3) As Used In This Clause, Records Include Books, Documents, Accounting Procedures And Practices, And Other Data, Regardless Of Type And Regardless Of Form. This Does Not Require The Contractor To Create Or Maintain Any Record That The Contractor Does Not Maintain In The Ordinary Course Of Business Or Pursuant To A Provision Of Law. (e)(1) Notwithstanding The Requirements Of The Clauses In Paragraphs (a), (b), (c), And (d) Of This Clause, The Contractor Is Not Required To Flow Down Any Far Clause, Other Than Those In This Paragraph (e)(1) In A Subcontract For Commercial Products Or Commercial Services. Unless Otherwise Indicated Below, The Extent Of The Flow Down Shall Be As Required By The Clause (i) 52.203 13, Contractor Code Of Business Ethics And Conduct (nov 2021) (41 U.s.c. 3509). (ii) 52.203 17, Contractor Employee Whistleblower Rights (nov 2023) (41 U.s.c. 4712). (iii) 52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (iv) 52.204 23, Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities (dec 2023) (section 1634 Of Pub. L. 115 91). (v) 52.204 25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (nov 2021) (section 889(a)(1)(a) Of Pub. L. 115 232). (vi) 52.204 27, Prohibition On A Bytedance Covered Application (jun 2023) (section 102 Of Division R Of Pub. L. 117 328). (vii) (a) 52.204 30, Federal Acquisition Supply Chain Security Act Orders Prohibition. (dec 2023) (pub. L. 115 390, Title Ii). (b) Alternate I (dec 2023) Of 52.204 30. (viii) 52.219 8, Utilization Of Small Business Concerns (feb 2024) (15 U.s.c. 637(d)(2) And (3)), In All Subcontracts That Offer Further Subcontracting Opportunities. If The Subcontract (except Subcontracts To Small Business Concerns) Exceeds The Applicable Threshold Specified In Far 19.702(a) On The Date Of Subcontract Award, The Subcontractor Must Include 52.219 8 In Lower Tier Subcontracts That Offer Subcontracting Opportunities. (ix) 52.222-21, Prohibition Of Segregated Facilities (apr 2015). (x) 52.222 26, Equal Opportunity (sep 2016) (e.o. 11246). (xi) 52.222 35, Equal Opportunity For Veterans (jun 2020) (38 U.s.c. 4212). (xii) 52.222 36, Equal Opportunity For Workers With Disabilities (jun 2020) (29 U.s.c. 793). (xiii) 52.222 37, Employment Reports On Veterans (jun 2020) (38 U.s.c. 4212). (xiv) 52.222-40, Notification Of Employee Rights Under The National Labor Relations Act (dec 2010) (e.o. 13496). Flow Down Required In Accordance With Paragraph (f) Of Far Clause 52.222-40. (xv) 52.222-41, Service Contract Labor Standards (aug 2018) (41 U.s.c. Chapter 67). (xvi)(a) 52.222-50, Combating Trafficking In Persons (nov 2021) (22 U.s.c. Chapter 78 And E.o. 13627). (b) Alternate I (mar 2015) Of 52.222-50 (22 U.s.c. Chapter 78 And E.o. 13627). (xvii) 52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment Requirements (may 2014) (41 U.s.c. Chapter 67). (xviii) 52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services Requirements (may 2014) (41 U.s.c. Chapter 67). (xix) 52.222-54, Employment Eligibility Verification (may 2022) (e. O. 12989). (xx) 52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026 (jan 2022). (xxi) 52.222-62 Paid Sick Leave Under Executive Order 13706 (jan 2022) (e.o. 13706). (xxii)(a) 52.224-3, Privacy Training (jan 2017) (5 U.s.c. 552a). (b) Alternate I (jan 2017) Of 52.224-3. (xxiii) 52.225 26, Contractors Performing Private Security Functions Outside The United States (oct 2016) (section 862, As Amended, Of The National Defense Authorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). (xxiv) 52.226 6, Promoting Excess Food Donation To Nonprofit Organizations (jun 2020) (42 U.s.c. 1792). Flow Down Required In Accordance With Paragraph (e) Of Far Clause 52.226-6. (xxv) 52.232 40, Providing Accelerated Payments To Small Business Subcontractors (mar 2023) (31 U.s.c. 3903 And 10 U.s.c. 3801). Flow Down Required In Accordance With Paragraph (c) Of 52.232 40. (xxvi) 52.240 1, Prohibition On Unmanned Aircraft Systems Manufactured Or Assembled By American Security Drone Act Covered Foreign Entities (nov 2024) (sections 1821 1826, Pub. L. 118 31, 41 U.s.c.3901 Note Prec.). (xxvii) 52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels (nov 2021) (46 U.s.c. 55305 And 10 U.s.c. 2631). Flow Down Required In Accordance With Paragraph (d) Of Far Clause 52.247-64. (2) While Not Required, The Contractor May Include In Its Subcontracts For Commercial Products And Commercial Services A Minimal Number Of Additional Clauses Necessary To Satisfy Its Contractual Obligations. (end Of Clause) Section F: Additional Information Award Will Be Based Upon A Comparative Evaluation Of Quotes In Accordance With The Simplified Acquisition Procedures Of Far 13. Comparative Evaluation Is The Side By Side Pairwise Comparison Of Quotes Based On Factors Resulting In A Contracting Officer Decision For The Quote Most Favorable To The Government. The Following Are The Decision Factors: - Price - Technical Capability - Past Performance The Award Will Be Made To The Response Most Advantageous To The Government. Responses Should Contain Your Best Terms, Conditions. To Facilitate The Award Process, All Quotes Must Include A Statement Regarding The Terms And Conditions Herein As Follows: "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document Without Modification, Deletion, Or Addition." Or "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document With The Exception, Deletion, Or Addition Of The Following:" Quoters Shall List Exception(s) And Rationale For The Exception(s), If Any. Questions Questions In Response To This Notice Shall Be Submitted Via Email Only To Stephanie Mcfadden At Stephanie.mcfadden@va.gov, No Later Than 1:00pm, Et, Monday, January 27, 2025. Questions May Or May Not Result In An Extension Of The Solicitation. Sources Sought 36c24425q0230 Must Be Included In The Subject Line Of The Email. Due Date Submission Of Your Response Shall Be Submitted Via Email Only To Stephanie Mcfadden At Stephanie.mcfadden@va.gov, No Later Than 1:00pm, Thursday, February 13, 2025. Sources Sought 36c24425q0230 Must Be Included In The Subject Line Of The Email. Late Submissions Shall Be Treated In Accordance With The Solicitation Provision At Far 52.212-1(f). The Response Shall Demonstrate The Ability To Meet The Requirements In The Solicitation. Specifically, Through Past Performances Of Providing Uniform Rental, Repair And Laundering Services To The Va Or Other Government Agencies. Quotes Shall Clearly And Completely Address The Technical Elements Listed In The Sow. Responses To These Elements Will Form The Basis Of Determining The Technical Acceptability Of The Quote. A Quote May Be Considered Not Technically Acceptable If Inadequate Or Insufficient Information Is Submitted, Which May Exclude The Quote From Further Consideration. Government May Make Award Based On The Initial Quotes Received; Therefore, An Offeror Should Submit Its Best Pricing With Its Quote. Pricing Submitted In Offeror Quote Shall Be Listed As Five Separate Line Items: One For Each Ordering Period As Outlined In Sow. Offerors Are Hereby Advised That Any Offeror-imposed Terms And Conditions That Deviate From The Government S Material Terms And Conditions Established By The Solicitation May Render The Quote Unacceptable And, Therefore, Ineligible For Award. The Government Intends To Issue A Single Award Resulting From This Solicitation. Attachments
Closing Date13 Feb 2025
Tender AmountRefer Documents
BULACAN AGRICULTURAL STATE COLLEGE Tender
Philippines
Details: Description Bulacan Agricultural State College San Ildefonso, Bulacan 3010 Procurement Of Goods 2025-01g: Supply, Delivery, And Installation Of Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hub Fy 2025 Preface These Philippine Bidding Documents (pbds) For The Procurement Of Goods Through Competitive Bidding Have Been Prepared By The Government Of The Philippines For Use By Any Branch, Constitutional Commission Or Office, Agency, Department, Bureau, Office, Or Instrumentality Of The Government Of The Philippines, National Government Agencies, Including Government-owned And/or Controlled Corporations, Government Financing Institutions, State Universities And Colleges, And Local Government Unit. The Procedures And Practices Presented In This Document Have Been Developed Through Broad Experience, And Are For Mandatory Use In Projects That Are Financed In Whole Or In Part By The Government Of The Philippines Or Any Foreign Government/foreign Or International Financing Institution In Accordance With The Provisions Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184. The Bidding Documents Shall Clearly And Adequately Define, Among Others: (i) The Objectives, Scope, And Expected Outputs And/or Results Of The Proposed Contract Or Framework Agreement, As The Case May Be; (ii) The Eligibility Requirements Of Bidders; (iii) The Expected Contract Or Framework Agreement Duration, The Estimated Quantity In The Case Of Procurement Of Goods, Delivery Schedule And/or Time Frame; And (iv) The Obligations, Duties, And/or Functions Of The Winning Bidder. Care Should Be Taken To Check The Relevance Of The Provisions Of The Pbds Against The Requirements Of The Specific Goods To Be Procured. If Duplication Of A Subject Is Inevitable In Other Sections Of The Document Prepared By The Procuring Entity, Care Must Be Exercised To Avoid Contradictions Between Clauses Dealing With The Same Matter. Moreover, Each Section Is Prepared With Notes Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Shall Not Be Included In The Final Documents. The Following General Directions Should Be Observed When Using The Documents: A. All The Documents Listed In The Table Of Contents Are Normally Required For The Procurement Of Goods. However, They Should Be Adapted As Necessary To The Circumstances Of The Particular Procurement Project. B. Specific Details, Such As The “name Of The Procuring Entity” And “address For Bid Submission,” Should Be Furnished In The Instructions To Bidders, Bid Data Sheet, And Special Conditions Of Contract. The Final Documents Should Contain Neither Blank Spaces Nor Options. C. This Preface And The Footnotes Or Notes In Italics Included In The Invitation To Bid, Bid Data Sheet, General Conditions Of Contract, Special Conditions Of Contract, Schedule Of Requirements, And Specifications Are Not Part Of The Text Of The Final Document, Although They Contain Instructions That The Procuring Entity Should Strictly Follow. D. The Cover Should Be Modified As Required To Identify The Bidding Documents As To The Procurement Project, Project Identification Number, And Procuring Entity, In Addition To The Date Of Issue. E. Modifications For Specific Procurement Project Details Should Be Provided In The Special Conditions Of Contract As Amendments To The Conditions Of Contract. For Easy Completion, Whenever Reference Has To Be Made To Specific Clauses In The Bid Data Sheet Or Special Conditions Of Contract, These Terms Shall Be Printed In Bold Typeface On Sections I (instructions To Bidders) And Iii (general Conditions Of Contract), Respectively. F. For Guidelines On The Use Of Bidding Forms And The Procurement Of Foreign-assisted Projects, These Will Be Covered By A Separate Issuance Of The Government Procurement Policy Board. Table Of Contents Glossary Of Acronyms, Terms, And Abbreviations ………………………….4 Section I. Invitation To Bid……………………………………………………..7 Section Ii. Instructions To Bidders…………………………………………...10 1. Scope Of Bid ………………………………………………………………………. 11 2. Funding Information………………………………………………………………. 11 3. Bidding Requirements ……………………………………………………………. 11 4. Corrupt, Fraudulent, Collusive, And Coercive Practices 11 5. Eligible Bidders…………………………………………………………………… 11 6. Origin Of Goods ………………………………………………………………….. 12 7. Subcontracts ……………………………………………………………………… 12 8. Pre-bid Conference ………………………………………………………………. 12 9. Clarification And Amendment Of Bidding Documents …………………………… 12 10. Documents Comprising The Bid: Eligibility And Technical Components …………. 12 11. Documents Comprising The Bid: Financial Component …………………………... 13 12. Bid Prices …………………………………………………………………………. 13 13. Bid And Payment Currencies ……………………………………………………… 14 14. Bid Security ………………………………………………………………………. 14 15. Sealing And Marking Of Bids ……………………………………………………… 14 16. Deadline For Submission Of Bids …………………………………………………. 14 17. Opening And Preliminary Examination Of Bids ………………………………….. 15 18. Domestic Preference ……………………………………………………………… 15 19. Detailed Evaluation And Comparison Of Bids ……………………………………. 15 20. Post-qualification ………………………………………………………………… 16 21. Signing Of The Contract …………………………………………………………… 16 Section Iii. Bid Data Sheet …………………………………………………..17 Section Iv. General Conditions Of Contract ……………………...………..19 1. Scope Of Contract ………………………………………………………………… 20 2. Advance Payment And Terms Of Payment ……………………………………….. 20 3. Performance Security ……………………………………………………………. 20 4. Inspection And Tests ……………………………………………………………… 20 5. Warranty …………………………………………………………………………. 21 6. Liability Of The Supplier ………………………………………………………….. 21 Section V. Special Conditions Of Contract ………………………………….22 Section Vi. Schedule Of Requirements ……………………………………....30 Section Vii. Technical Specifications …………………………………………34 Section Viii. Checklist Of Technical And Financial Documents …………..38 Glossary Of Acronyms, Terms, And Abbreviations Abc – Approved Budget For The Contract. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Cda - Cooperative Development Authority. Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Cif – Cost Insurance And Freight. Cip – Carriage And Insurance Paid. Cpi – Consumer Price Index. Ddp – Refers To The Quoted Price Of The Goods, Which Means “delivered Duty Paid.” Dti – Department Of Trade And Industry. Exw – Ex Works. Fca – “free Carrier” Shipping Point. Fob – “free On Board” Shipping Point. Foreign-funded Procurement Or Foreign-assisted Project– Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Framework Agreement – Refers To A Written Agreement Between A Procuring Entity And A Supplier Or Service Provider That Identifies The Terms And Conditions, Under Which Specific Purchases, Otherwise Known As “call-offs,” Are Made For The Duration Of The Agreement. It Is In The Nature Of An Option Contract Between The Procuring Entity And The Bidder(s) Granting The Procuring Entity The Option To Either Place An Order For Any Of The Goods Or Services Identified In The Framework Agreement List Or Not Buy At All, Within A Minimum Period Of One (1) Year To A Maximum Period Of Three (3) Years. (gppb Resolution No. 27-2019) Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Gppb – Government Procurement Policy Board. Incoterms – International Commercial Terms. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Supplier – Refers To A Citizen, Or Any Corporate Body Or Commercial Company Duly Organized And Registered Under The Laws Where It Is Established, Habitually Established In Business And Engaged In The Manufacture Or Sale Of The Merchandise Or Performance Of The General Services Covered By His Bid. (item 3.8 Of Gppb Resolution No. 13-2019, Dated 23 May 2019). Supplier As Used In These Bidding Documents May Likewise Refer To A Distributor, Manufacturer, Contractor, Or Consultant. Un – United Nations. Section I. Invitation To Bid Notes On The Invitation To Bid The Invitation To Bid (ib) Provides Information That Enables Potential Bidders To Decide Whether To Participate In The Procurement At Hand. The Ib Shall Be Posted In Accordance With Section 21.2 Of The 2016 Revised Irr Of Ra No. 9184. Apart From The Essential Items Listed In The Bidding Documents, The Ib Should Also Indicate The Following: A. The Date Of Availability Of The Bidding Documents, Which Shall Be From The Time The Ib Is First Advertised/posted Until The Deadline For The Submission And Receipt Of Bids; B. The Place Where The Bidding Documents May Be Acquired Or The Website Where It May Be Downloaded; C. The Deadline For The Submission And Receipt Of Bids; And D. Any Important Bid Evaluation Criteria (e.g., The Application Of A Margin Of Preference In Bid Evaluation). The Ib Should Be Incorporated In The Bidding Documents. The Information Contained In The Ib Must Conform To The Bidding Documents And In Particular To The Relevant Information In The Bid Data Sheet. Bulacan Agricultural State College San Ildefonso, Bulacan 3010 Invitation To Bid For 2025-01g: Supply, Delivery, And Installation Of Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hub 1. The Bulacan Agricultural State College, Through The Gaa Capital Outlay Fy 2025 Intends To Apply The Sum Of One Billion Pesos Pesos (php1,000,000,000.00) Being The Abc To Payments Under The Contract For Supply, Delivery, And Installation Of Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hub. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bulacan Agricultural State College Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required With Contract Duration Of 280 Calendar Days. Bidders Should Have Completed, Within The Last Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Bulacan Agricultual State College And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8am To 4:30pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 16, 2025 To February 7, 2025 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php75,000.00. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Presenting The Receipt Upon Submission Of Their Bid Documents. 6. The Bulacan Agricultural State College Will Hold A Pre-bid Conference On January 24, 2025, 09:00 Am Via Zoom Platform (meeting Id: 853 1254 4715, Passcode: 578270) Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before 08:30 Am Of February 7, 2025. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On February 7, 2025, 09:00 Am At The Conference Room, Administration Building, Basc, San Ildefonso, Bulacan. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. Observers Will Be Invited To Attend And Witness The Bid Proceedings. 11. The Bulacan Agricultural State College Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Rona Angela O. Clarin Bac Secretariat Head Bulacan Agricultural State College Brgy. Pinaod, San Ildefonso, Bulacan (044) 697-1240 And 0923-108-1526 Ronaangela_clarin@basc.edu.ph Www.basc.edu.ph 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Http://www.basc.edu.ph January 16, 2025 (sgd) Ronald Reagan T. Alonzo,ph.d. Bac Chairperson Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, Bulacan Agricultural State College Wishes To Receive Bids For The Supply, Delivery, And Installation Of Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hub With Identification Number 2025-01g. The Procurement Project (referred To Herein As “project”) Is Composed Of Twenty-eight (28) Components The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For Gaa Fy 2025 In The Amount Of Php1,000,000,000.00 2.2. The Source Of Funding Is: A. Nga, The General Appropriations Act Of 2025. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. Not Applicable. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To At Least Fifty Percent (50%) Of The Abc Or Have Completed At Least Two (2) Similar Contracts, The Aggregate Amount Of Which Should Be Equivalent To At Least Fifty Percent (50%) In The Case Of Non-expendable Supplies And Services Or Twenty-five Percent (25%) In The Case Of Expendable Supplies] Of The Abc For This Project; 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time At Its Physical Address As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within The Last Five (5) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In E. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In Section Vii (technical Specifications). 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2. Payment Of The Contract Price Shall Be Made In Philippine Pesos. 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until 120 Days From The Opening Of Bids. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The Original Of The First And Second Components Of Its Bid And Plus Two (2) Copies Of Each Kind, Labeled As Copy 1 And Copy 2 Duly Signed By The Authorized Representative Of The Bidder. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded As One Project Having Several Items That Shall Be Awarded As One Contract. 19.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20. Post-qualification 20.1. Not Applicable 20.2. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Notes On The Bid Data Sheet The Bid Data Sheet (bds) Consists Of Provisions That Supplement, Amend, Or Specify In Detail, Information, Or Requirements Included In The Itb Found In Section Ii, Which Are Specific To Each Procurement. This Section Is Intended To Assist The Procuring Entity In Providing The Specific Information In Relation To Corresponding Clauses In The Itb And Has To Be Prepared For Each Specific Procurement. The Procuring Entity Should Specify In The Bds Information And Requirements Specific To The Circumstances Of The Procuring Entity, The Processing Of The Procurement, And The Bid Evaluation Criteria That Will Apply To The Bids. In Preparing The Bds, The Following Aspects Should Be Checked: A. Information That Specifies And Complements Provisions Of The Itb Must Be Incorporated. B. Amendments And/or Supplements, If Any, To Provisions Of The Itb As Necessitated By The Circumstances Of The Specific Procurement, Must Also Be Incorporated. Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Supply, Delivery, Installation, Commissioning And Set-up Of Ict Materials And Laboratory Equipment With Any Of The Two (2) Components As Follows: 1. Productivity Software And/or Licenses 2. Hardware Such As Servers, Desktops And/or Laptops 3. Closed-circuit Television (cctv) 4. Smart Solar Lighting Systems 5. Network Infrastructure B. Completed Within Three (3) Years Prior To The Deadline For The Submission And Receipt Of Bids That Is Equivalent To 50% Of Abc Or Completed At Least Two (2) Similar Contracts, The Aggregate Amount Of Which Should Be Equivalent To At Least Fifty Percent (50%) In The Case Of Non-expendable Supplies And Services Or Twenty-five Percent (25%) In The Case Of Expendable Supplies] Of The Abc For This Project; 7.1 Subcontracting Is Not Allowed. 12 The Bid Prices Of Goods And Services Supplied From Outside Of The Philippines Shall Be Quoted In Philippine Pesos. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than Php20,000,000.00 [(2%) Of The Abc] If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than Php50,000,000.00[(5%) Of The Abc], If Bid Security Is In Surety Bond. 19.3 The Project Will Be Awarded As A Single Project. 20.2 1. Income Tax Return (form 1701/1702) With Audited Financial Statement., 2. Business Tax Return (forms 2550m And 2550q) Prior To Opening Of Bids Filed Thru Electronic Filing And Payment System (efps). Only Tax Returns Filed And Taxes Paid Through The Bir Electronic Filing And Payment System (efps) Shall Be Accepted. 21.2 Not Applicable Section Iv. General Conditions Of Contract Notes On The General Conditions Of Contract The General Conditions Of Contract (gcc) In This Section, Read In Conjunction With The Special Conditions Of Contract In Section V And Other Documents Listed Therein, Should Be A Complete Document Expressing All The Rights And Obligations Of The Parties. Matters Governing Performance Of The Supplier, Payments Under The Contract, Or Matters Affecting The Risks, Rights, And Obligations Of The Parties Under The Contract Are Included In The Gcc And Special Conditions Of Contract. Any Complementary Information, Which May Be Needed, Shall Be Introduced Only Through The Special Conditions Of Contract. 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1. Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2. The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than Prior To The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184 4. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project In Addition To Tests In The Scc, Section Iv (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 6.1. In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 6.2. The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Special Conditions Of Contract Notes On The Special Conditions Of Contract Similar To The Bds, The Clauses In This Section Are Intended To Assist The Procuring Entity In Providing Contract-specific Information In Relation To Corresponding Clauses In The Gcc Found In Section Iv. The Special Conditions Of Contract (scc) Complement The Gcc, Specifying Contractual Requirements Linked To The Special Circumstances Of The Procuring Entity, The Procuring Entity’s Country, The Sector, And The Goods Purchased. In Preparing This Section, The Following Aspects Should Be Checked: A. Information That Complements Provisions Of The Gcc Must Be Incorporated. B. Amendments And/or Supplements To Provisions Of The Gcc As Necessitated By The Circumstances Of The Specific Purchase, Must Also Be Incorporated. However, No Special Condition Which Defeats Or Negates The General Intent And Purpose Of The Provisions Of The Gcc Should Be Incorporated Herein. Special Conditions Of Contract Gcc Clause 1 Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: “the Delivery Terms Applicable To This Contract Are Delivered At Basc, San Ildefonso, Bulacan. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is Dr. Ma. Melanie A. Cruz And Mr. Florentino S. Casuco, Jr. Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: A. Performance Or Supervision Of On-site Assembly And/or Start-up Of The Supplied Goods; B. Furnishing Of Tools Required For Assembly And/or Maintenance Of The Supplied Goods; C. Furnishing Of A Detailed Operations And Maintenance Manual For Each Appropriate Unit Of The Supplied Goods; D. Performance Or Supervision Or Maintenance And/or Repair Of The Supplied Goods, For A Period Of Time Agreed By The Parties, Provided That This Service Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And E. Training Of The Procuring Entity’s Personnel, At The Supplier’s Plant And/or On-site, In Assembly, Start-up, Operation, Maintenance, And/or Repair Of The Supplied Goods. The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Packaging – The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. The Packaging, Marking, And Documentation Within And Outside The Packages Shall Comply Strictly With Such Special Requirements As Shall Be Expressly Provided For In The Contract, Including Additional Requirements, If Any, Specified Below, And In Any Subsequent Instructions Ordered By The Procuring Entity. The Outer Packaging Must Be Clearly Marked On At Least Four (4) Sides As Follows: Name Of The Procuring Entity Name Of The Supplier Contract Description Final Destination Gross Weight Any Special Lifting Instructions Any Special Handling Instructions Any Relevant Hazchem Classifications A Packaging List Identifying The Contents And Quantities Of The Package Is To Be Placed On An Accessible Point Of The Outer Packaging If Practical. If Not Practical The Packaging List Is To Be Placed Inside The Outer Packaging But Outside The Secondary Packaging. Transportation – Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip, Or Ddp, Transport Of The Goods To The Port Of Destination Or Such Other Named Place Of Destination In The Philippines, As Shall Be Specified In This Contract, Shall Be Arranged And Paid For By The Supplier, And The Cost Thereof Shall Be Included In The Contract Price. Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Goods Are To Be Transported On Carriers Of Philippine Registry. In The Event That No Carrier Of Philippine Registry Is Available, Goods May Be Shipped By A Carrier Which Is Not Of Philippine Registry Provided That The Supplier Obtains And Presents To The Procuring Entity Certification To This Effect From The Nearest Philippine Consulate To The Port Of Dispatch. In The Event That Carriers Of Philippine Registry Are Available But Their Schedule Delays The Supplier In Its Performance Of This Contract The Period From When The Goods Were First Ready For Shipment And The Actual Date Of Shipment The Period Of Delay Will Be Considered Force Majeure. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Intellectual Property Rights – The Supplier Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof 2.2 The Terms Of Payment Shall Be As Follows: 15% : Upon Submission Of Signed Contract 25% : Submission And Acceptance Of Detailed Work Plan And Systems Design 1. University Information System 2. Learning Management System 3. Cashiering System 4. Human Resource Management System & Time Keeping System 5. Payroll Management System 6. Assets & Fleet Management System 7. Document Management System 8. Trouble Ticketing System 9. Queuing / Appointment System 10. Executive Information System 11. Campus Portal System 12. University Library System 13. Econference Room W/ Video Conferencing 14. Internet Connectivity 15. Campus Network System 16. Fiber Optics Works 17. Structured Cabling Works 18. It Security Operations Center & Network Operations Center 19. Campus Data Center Upgrade 20. Data Center Network Switches 21. Data Center Compute System & Data Center Block And File Storage System 22. Data Center Backup And Recovery System 23. Cloud Infrastructure 24. Ip-pabx System 25. Software & Networking Laboratories 26. E-classroom, E-room Infrastructure And Smart Led Solar Powered Light 27. E-library Infrastructure 28. Smart Function Hall 26.43% 1st Batch Hardware Completion Of Equipment Deliverables For The Following Components At Basc Facility 1. It Security Operations Center & Network Operations Center 2. Campus Data Center Upgrade 3. Data Center Network Switches 4. Data Center Compute System & Data Center Block And File Storage System 5. Data Center Backup And Recovery System 6. Ip-pabx System 7. Software & Networking Laboratories 8. E-classroom, E-room Infrastructure And Smart Led Solar Powered Light 9. E-library Infrastructure 10. Smart Function Hall 11. Campus Network System 12. Fiber Optics Works 13. Structured Cabling Works 14. Human Resource Management System & Time Keeping System 15. Document Management System 16. Queuing / Appointment System 1st Batch User Acceptance Testing (uat) Completion For The Following System Components At Basc Facility 1. Human Resource Management System & Time Keeping System 2. Payroll Management System 3. Assets & Fleet Management System 4. Document Management System 5. Trouble Ticketing System 6. Queuing / Appointment System 7. Campus Portal System 23.57% 2nd Batch Hardware Completion Of Equipment Deliverables For The Following Components At Basc Facility 1. Internet Connectivity 2. University Library System 3. Econference Room W/ Video Conferencing 2nd Batch User Acceptance Testing (uat) Completion For The Following System Components At Basc Facility 1. Cloud Infrastructure 2. University Information System 3. Learning Management System 4. Executive Information System 5. University Library System Hardware Installation, Configuration And Integration 1. Campus Network System 2. Structured Cabling Works 3. It Security Operations Center & Network Operations Center 4. Data Center Network Switches 5. Data Center Backup And Recovery System 6. Ip-pabx System 7. E-library Infrastructure Acceptance Of Volume Testing 1. University Information System 2. Learning Management System 3. Cashiering System 4. Human Resource Management System & Time Keeping System 5. Payroll Management System 6. Assets & Fleet Management System 7. Document Management System 8. Trouble Ticketing System 9. Queuing / Appointment System 10. Executive Information System 11. Campus Portal System 12. University Library System 13. Econference Room W/ Video Conferencing : Completion Of Training 1. University Information System 2. Learning Management System 3. Cashiering System 4. Human Resource Management System & Time Keeping System 5. Payroll Management System 6. Assets & Fleet Management System 7. Document Management System 8. Trouble Ticketing System 9. Queuing / Appointment System 10. Executive Information System 11. Campus Portal System 12. University Library System 13. Econference Room W/ Video Conferencing 14. Campus Network System 15. It Security Operations Center & Network Operations Center 16. Campus Data Center Upgrade 17. Data Center Backup And Recovery System 18. Smart Function Hall 10% : Project Acceptance And Turnover 1. University Information System 2. Learning Management System 3. Cashiering System 4. Human Resource Management System & Time Keeping System 5. Payroll Management System 6. Assets & Fleet Management System 7. Document Management System 8. Trouble Ticketing System 9. Queuing / Appointment System 10. Executive Information System 11. Campus Portal System 12. University Library System 13. Econference Room W/ Video Conferencing 14. Internet Connectivity 15. Campus Network System 16. Fiber Optics Works 17. Structured Cabling Works 18. It Security Operations Center & Network Operations Center 19. Campus Data Center Upgrade 20. Data Center Network Switches 21. Data Center Compute System & Data Center Block And File Storage System 22. Data Center Backup And Recovery System 23. Cloud Infrastructure 24. Ip-pabx System 25. Software & Networking Laboratories 26. E-classroom And E-room Infrastructure And Smart Led Solar Powered Light 27. E-library Infrastructure 28. Smart Function Hall 4 The Inspections And Tests That Will Be Conducted Are: On Site Testing Of All Items To Be Procured. Section Vi. Schedule Of Requirements The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Delivered, Weeks/months 1 University Information System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 2 Learning Management System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 3 Innovative Cashiering System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 4 Human Resource Management System & Time Keeping System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 5 Payroll Management System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 6 Assets & Fleet Management System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 7 Document Management System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 8 Trouble Ticketing System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 9 Queuing System / Appointment System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 10 Executive Information System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 11 Campus Portal System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 12 University Library System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 13 Econference Room W/ Video Conferencing 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 14 Internet Connectivity 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 15 Campus Network System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 16 Fiber Optics Works 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 17 Structured Cabling Works 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 18 It Security Operations Center & Network Operations Center 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 19 Campus Data Center Upgrade 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 20 Data Center Network Switches (network Infrastructure) 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 21 Data Center Compute System & Data Center Block & File Storage System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 22 Data Center Backup And Recovery System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 23 Basc Cloud Infrastructure 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 24 Ip-pabx System 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 25 Software And Networking Laboratories 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 26 E-classroom And E-room Infrastructure And Smart Led Solar Powered Light 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 27 E-library Infrastructure 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed 28 Smart Function Hall 1 Lot 280 Calendar Days From Receipt Of Notice To Proceed For Details See Terms Of Reference [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of ____________________________ Section Vii. Technical Specifications Notes For Preparing The Technical Specifications A Set Of Precise And Clear Specifications Is A Prerequisite For Bidders To Respond Realistically And Competitively To The Requirements Of The Procuring Entity Without Qualifying Their Bids. In The Context Of Competitive Bidding, The Specifications (e.g. Production/delivery Schedule, Manpower Requirements, And After-sales Service/parts, Descriptions Of The Lots Or Items) Must Be Prepared To Permit The Widest Possible Competition And, At The Same Time, Present A Clear Statement Of The Required Standards Of Workmanship, Materials, And Performance Of The Goods And Services To Be Procured. Only If This Is Done Will The Objectives Of Transparency, Equity, Efficiency, Fairness , And Economy In Procurement Be Realized, Responsiveness Of Bids Be Ensured, And The Subsequent Task Of Bid Evaluation And Post-qualification Facilitated. The Specifications Should Require That All Items, Materials And Accessories To Be Included Or Incorporated In The Goods Be New, Unused, And Of The Most Recent Or Current Models, And That They Include Or Incorporate All Recent Improvements In Design And Materials Unless Otherwise Provided In The Contract. Samples Of Specifications From Previous Similar Procurements Are Useful In This Respect. The Use Of Metric Units Is Encouraged. Depending On The Complexity Of The Goods And The Repetitiveness Of The Type Of Procurement, It May Be Advantageous To Standardize The General Technical Specifications And Incorporate Them In A Separate Subsection. The General Technical Specifications Should Cover All Classes Of Workmanship, Materials, And Equipment Commonly Involved In Manufacturing Similar Goods. Deletions Or Addenda Should Then Adapt The General Technical Specifications To The Particular Procurement. Care Must Be Taken In Drafting Specifications To Ensure That They Are Not Restrictive. In The Specification Of Standards For Equipment, Materials, And Workmanship, Recognized Philippine And International Standards Should Be Used As Much As Possible. Where Other Particular Standards Are Used, Whether National Standards Or Other Standards, The Specifications Should State That Equipment, Materials, And Workmanship That Meet Other Authoritative Standards, And Which Ensure At Least A Substantially Equal Quality Than The Standards Mentioned, Will Also Be Acceptable. The Following Clause May Be Inserted In The Special Conditions Of Contract Or The Technical Specifications. Sample Clause: Equivalency Of Standards And Codes Wherever Reference Is Made In The Technical Specifications To Specific Standards And Codes To Be Met By The Goods And Materials To Be Furnished Or Tested, The Provisions Of The Latest Edition Or Revision Of The Relevant Standards And Codes Shall Apply, Unless Otherwise Expressly Stated In The Contract. Where Such Standards And Codes Are National Or Relate To A Particular Country Or Region, Other Authoritative Standards That Ensure Substantial Equivalence To The Standards And Codes Specified Will Be Acceptable. Reference To Brand Name And Catalogue Number Should Be Avoided As Far As Possible; Where Unavoidable They Should Always Be Followed By The Words “or At Least Equivalent.” References To Brand Names Cannot Be Used When The Funding Source Is The Gop. Where Appropriate, Drawings, Including Site Plans As Required, May Be Furnished By The Procuring Entity With The Bidding Documents. Similarly, The Supplier May Be Requested To Provide Drawings Or Samples Either With Its Bid Or For Prior Review By The Procuring Entity During Contract Execution. Bidders Are Also Required, As Part Of The Technical Specifications, To Complete Their Statement Of Compliance Demonstrating How The Items Comply With The Specification. Technical Specifications Item Specification Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] 1 University Information System 2 Learning Management System 3 Innovative Cashiering System 4 Human Resource Management System & Time Keeping System 5 Payroll Management System 6 Assets & Fleet Management System 7 Document Management System 8 Trouble Ticketing System 9 Queuing System / Appointment System 10 Executive Information System 11 Campus Portal System 12 University Library System 13 Econference Room W/ Video Conferencing 14 Internet Connectivity 15 Campus Network System 16 Fiber Optics Works 17 Structured Cabling Works 18 It Security Operations Center & Network Operations Center 19 Campus Data Center Upgrade 20 Data Center Network Switches (network Infrastructure) 21 Data Center Compute System & Data Center Block & File Storage System 22 Data Center Backup And Recovery System 23 Basc Cloud Infrastructure 24 Ip-pabx System 25 Software And Networking Laboratories 26 E-classroom And E-room Infrastructure And Smart Led Solar Powered Light 27 E-library Infrastructure 28 Smart Function Hall For Details See Terms Of Reference [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of ____________________________ Republic Of The Philippines Bulacan Agricultural State College Address: Pinaod, San Ildefonso, Bulacan Website: Https://basc.edu.ph/ Tel/fax No.: (044) 931 8660 Terms Of Reference Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hub Definition Of Terms Key Description Internet-based Application A Client/server Application That Uses Standard Internet Protocols For Connecting The Client To The Server. Acl Access Control List Ap Transmit Power Access Point Transmit Power Aec Acoustic Echo Cancellation Ad Database Active Directory Database Arp Address Resolution Protocol Awg American Wire Gauge Api Application Programming Interface Abc Approved Budget Cost Ai Rf Artificial Intelligence Radio Frequency Afms Assets & Fleet Management System Aes/ebu Audio Engineering Society / European Broadcasting Union Ah Authentication Header Ajb Auto Jitter Buffer Agc Automatic Gain Control Agronomy The Application Of Science And Technology From The Fields Of Biology, Chemistry, Economics, Ecology, Soil Science, Water Science, Pest Management, And Genetics To The Improvement And Management Of The World's Major Food Crops. Animal Husbandry The Branch Of Agriculture Is Concerned With Animals That Are Raised For Meat, Fiber, Milk, Or Other Products. It Includes Day-to-day Care, Management, Production, Nutrition, Selective Breeding, And Livestock Raising. Anpr Camera Automatic Number Plate Recognition Camera Basc Bulacan Agricultural State College Bunas Bulacan National Agricultural School Bi Dashboard Business Intelligence Dashboard Cmmi5 Capability Maturity Model Integration 5 Cpu Central Processing Unit Ca Certificate Authentication Certificate Authority Certificate Authentication Cor Certificate Of Registration Ceh Certification Certified Ethical Hacker Certification Cgeit Certified In The Governance Of Enterprise It Isc Certified Information Systems Security Professional Cpmp Certified Project Management Practitioner Cos Class Of Service Cctv Closed-circuit Television Cng Comfort Noise Generation Dtr Daily Time Record Dpa Data Privacy Act [r.a. No. 10173] Db Decibel Dbm Department Of Budget And Management Dscp Differentiated Services Code Point Dsp Digital Signal Processing Dvi Digital Visual Interface Dss Direct Station Selection Dr Drills Disaster Recovery Drills Dms Document Management System Dns Domain Name System Ddr4 Double Data Rate 4 Dfp Dynamic Fabric Provisioning Dhcp Dynamic Host Configuration Protocol Dps Dynamic Path Selection Ecc Employee Compensation Contribution Esp Encapsulating Security Payload Eis Executive Information System Xlr External Line Return Fpi Fabric Performance Impact Fspf Fabric Shortest Path First Foc Fiber Optic Cable Ftp File Transfer Protocol Fdmi Flat Display Mounting Interface Fhd Ir Full High Definition Infrared Camera Fqdn Fully Qualified Domain Name Fdm Fused Deposition Modeling Gbe Gigabit Ethernet Gb Gigabyte Gbps Gigabyte Per Second Gui Graphical User Interface Gddr5 Graphics Double Data Rate 5 Hdd Hard Disk Drive Hi-fi High Fidelity Hdmi High-definition Multimedia Interface Hf Amplifier High-frequency Amplifier Hris Human Resource Information System Http Hypertext Transfer Protocol Ict Information And Communications Technology Ict Information Communication Technology Itil Certification Information Technology Infrastructure Library Certification Ir Infrared Radiation Ir/rgb Infra-red/red, Green And Blue Ieee Institute Of Electrical And Electronics Engineers Ipmi Intelligent Platform Management Interface Iec Standard International Electrotechnical Commission Standard Iso International Organization For Standardization Igmp Internet Group Management Protocol Ike Internet Key Exchange Ip Internet Protocol Ipofc Internet Protocol Over Fibre Channel Ip-pabx Internet Protocol Private Branch Exchange Ipsec Internet Protocol Security Ipv4 Internet Protocol Version 4 Ipv6 Internet Protocol Version 6 Isp Internet Service Provider Isl Trunking Inter-switch Link Trunking Management Tunnel Encryption It Is A Secure Channel Or Connection Established Between A Management Station And A Network Device To Remotely Manage And Configure The Device. Intelligent Load Balancing It Is The Technique Used In Computer Networking And Server Management To Distribute Incoming Network Traffic Or Workload Across Multiple Servers Or Resources In A Way That Optimizes Resource Utilization, Improves Performance, And Ensures High Availability. Kpi Key Performance Indicator Kvm Keyboard, Video, Mouse Lms Learning Management System Ldap Lightweight Directory Access Protocol Lacp Link Aggregation Control Protocol Lan Local Area Network Lf Amplifier Low-frequency Amplifier Mac Media Access Control Mp Megapixels Ms Milliseconds Mcb Miniature Circuit Breaker Maps Monitoring And Alerting Policy Suite M-lag Multichassis Link Aggregation Group Mimo Multiple-input And Multiple-output Nhmfc National Home Mortgage Finance Corporation Nat Network Address Translation Nat-t Network Address Translation-traversal Ndi Network Device Interface Nic’s Network Interface Cards Nvme Network Address Translation Ops Open Pluggable Specification Ospf Open Shortest Path First Oem Original Equipment Manufacturer Oem Certification Original Equipment Manufacturer Certification Pppoe Point-to-point Protocol Over Ethernet Pptp Point-to-point Tunneling Protocol Pvc Polyvinyl Chloride Pdu Power Distribution Unit Poe Power Over Ethernet Pacu Precision Air-conditioning Units Pc Project Category Psc Project Sub– Category Rfid Radio Frequency Identification Ram Random Access Memory Rdp Read Diagnostics Parameter Rstp Real-time Streaming Protocol Rj Registered Jack Rdbms Relational Database Management System Rh Relative Humidity Rcs Reliable Commit Service Rog Report Of Grades Rotc Reserve Officers' Training Corps Rpm Revolutions Per Minute Rip Routing Information Protocol Srtp Secure Real-time Transport Protocol Ssl Secure Sockets Layer Ssl Vpn Secure Sockets Layer Virtual Private Network Sata Serial Advanced Technology Attachment Sp Service Provider Ssid Service Set Identifier Sip Session Initiation Protocol Stp Shielded Twisted Pair Sms Short Message Service Sns Simple Name Server Sso Single Sign-on Sddq Slow Drain Device Quarantine Sddq Slow Drain Device Quarantine Sfp Small Form-factor Pluggable Cadre A Small Group Of People Specially Trained For A Particular Purpose Or Profession. Ssd Solid State Drive Spl Sound Pressure Level Soa Statement Of Account San Storage Area Network Sqlnet Structured Query Language Network Tb Terabyte Encrypted Communication The Process Of Encoding Information In Such A Way That Only Authorized Parties Can Access And Understand It. Tat Time & Attendance Terminal Tor Transcript Of Records Tcp/ip Transmission Control Protocol/internet Protocol Tls Transport Layer Security Tftp Trivial File Transfer Protocol Uhd Ultra High Definition Ups Uninterruptible Power Supply Usb Universal Serial Bus Uis University Information System Utp Unshielded Twisted Pair Udp User Datagram Protocol Ui User Interface Vga Video Graphics Array Vram Video Random-access Memory Vlan Virtual Local Area Network Vms Virtual Machines Vpn Virtual Private Network Vad Voice Activity Detection Voip Voice Over Internet Protocol Wpa Wi-fi Protected Access Wep Wired Equivalent Privacy Wan Wireless Area Network Wi-fi Wireless Fidelity Wips Wireless Intrusion Prevention System I. Introduction A. Executive Summary The Bulacan Agricultural State College (basc) Was Established In 1952. It Started As The Community Agricultural School In Bintog, Plaridel, Bulacan With About 100 Students. The Succeeding Years Saw An Increase In The Number Of Students. Unlike Before, Students Came Not Only From The Local Community But Also From Elsewhere In The Province. With This, The School Was Aptly Named The Bulacan Provincial High School. In 1955, With A Growing Population And A Need To Accommodate The Same, Presidential Proclamation No. 163 Was Issued Allocating 200 Hectares Of Land For The School In Pinaod, San Ildefonso, Bulacan. Not Long After, Republic Act (r.a.) No. 948 Was Issued Changing The School’s Name To Bulacan National Agricultural School (bunas). In 1960, Tertiary Education Was Offered In Bunas With A Two-year Associate In Agriculture Program, Which Eventually Led To The Offering Of The Bachelor Of Science In Agriculture Degree With Majors In Agronomy And Animal Husbandry. Cognizant Of The Broad-based Agricultural Education And Training Needs Of The Bulakeños, Hon. Ricardo C. Silverio, And Then Representative Of District Ii Of The Province Of Bulacan Authored House Bill No. 2389 Which Moved For An Expanded Educational Program For Bunas. With The Bilateral Approval Of Both Houses, President Fidel V. Ramos Signed R.a. No. 8548, Officially Converting The Bunas Into A Chartered State College Known As The Bulacan National Agricultural State College On February 24, 1998. Its Name Was Changed To Bulacan Agricultural State College By Virtue Of R.a. No. 9249 Signed By Her Excellency Gloria Macapagal Arroyo On February 19, 2004. As Mandated By Its Charter, Basc Shall Provide Higher Professional, Technical, And Special Instructions For Special Purposes And Promote Research And Extension Services And Advanced Studies In Agriculture, Arts And Science Programs, And Other Allied Courses. It Shall Also Offer Short-term Technical And Vocational Non-degree Courses Within Its Area Of Specialization To Meet The Needs Of Its Constituents. Basc Main Campus Is Situated In Pinaod, San Ildefonso, Bulacan. It Has Three Extension Campuses – Doña Remedios Trinidad Campus; Balagtas Technical Vocational School Campus; And Fortunato Halili National Agricultural School. The Basc Board Of Trustees Is The Policy-making Body Of The College Composed Of The Following: Chairperson: Chairperson, Commission On Higher Education Vice-chairperson: President, Bulacan Agricultural State College Members: Chairperson, Senate Committee On Higher And Technical Education Chairperson, House Committee On Higher And Technical Education Director, Neda Region Iii Director, Da Region Iii President, Basc Alumni Association Faculty Trustee Student Trustee Prominent Citizen Resource Person: Director, Dost Region Iii The College Is Headed By Its President, Dr. Jameson H. Tan, And Assisted By Dr. Cecilia S. Santiago, Vice President For Academic Affairs; Dr. Ronald Reagan T. Alonzo, Vice President For Administration, Finance And Business Affairs; And Dr. Honeylet J. Nicolas, Vice President For Research, Extension, Production And Development. The Bulacan Agricultural State College Shall Strive For Excellence In Agriculture And Other Allied Disciplines. It Shall Provide For And Address Ever-changing Educational Needs And Services For Those Seeking To Expand Their Intellectual Horizons. Basc Shall Address National And International Issues And Be Established As A Major Presence And Contributor To The Progress Of The Global Community. To Ensure The Training Of Productive And Competitive Graduates In Agriculture And Other Related Disciplines, Basc Is Keen On Delivering The Following Goals/objectives. 1. Produce Quality Graduates Equipped With Knowledge And Expertise Enough To Meet The Demands And Challenges Of The Fast-changing Society. 2. Develop A Cadre Of Highly Competent Manpower To Implement The Various Academic, Research, Extension, Training, And Production Programs Of The College. 3. Undertake Relevant Research, Extension, And Training Programs To Accelerate Productivity And For Additional Income Of People In Rural And Urban Areas. 4. Promote The General Welfare Of The Faculty And Staff As Well As The Students. 5. Maintain A Wholesome Academic Community Conducive To Learning By Providing A State-of-the-art Laboratory, Information And Communication Equipment, And A Modern Library, Sports, And Other Facilities. 6. Establish Networks, Linkages, Or Collaboration With Other Stakeholders To Take Advantage Of The Synergy For Fund Sourcing. 7. Develop And Implement Resource Generation Projects To Modernize And Sustain The Operation Of The College. 8. Implement An Improved Administrative Efficiency And Financial Management System. Delivering These Goals/objectives Would Require Adding And Improving Systems As Well As Information Communication Technology (ict) Equipment For Basc To Provide Better Management, Process, Technology, And System, Thus, Achieving An Improvement For The Goals Outlined Above. The Agency Aligns Its Support Commitments To Its Core Programs Focused On The Desired Impact Of Improved Ict Equipment And Systems Using The Latest Technology And Developing A Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hub. To Address These Services, Systems Are Needed To Properly Put In Place All The Information. These Systems Will Target All The Services Mentioned In Such That Each Service Will Be Dealt With One By One As Follows: 1. University Information System – A Platform That Can Oversee And Streamline All Aspects Of University Operations, From Student Admission, Enrollment, Student And Alumni Services, Faculty And Staff Management, Curriculum Management, Grades, And Academic Progress. 2. Learning Management System – It Should Integrate Course Development, Distribution, Evaluation, And Control Into A Unified, Device-compatible Interface. It Facilitates Personalized Learning Trajectories That Enhance Student Engagement And Achievement By Centralizing Communication, Content, Analytics, And Work Process Automation. 3. Cashiering System – This Is A Cutting-edge And Highly Efficient Solution To Transform Cashiering Operations Within The Basc Setting. 4. Human Resource Management System & Timekeeping System – Integrates All Human Resource (hr) Functions Into A Unified System Designed To Streamline Hr Process Workflow And Improve Data Management, Data Security, Integrity, Onboarding, Benefits Administration, Compliance, Performance Tracking, Development, And Retention. 5. Payroll Management System – This Represents A Cutting-edge Solution To Revolutionize And Simplify Payroll Management. 6. Assets & Fleet Management System – A Comprehensive Platform Designed To Assist The University In Efficiently Monitoring And Administering The University’s Valuable Assets And Fleet Of Vehicles. 7. Document Management System – A Digital Platform Designed To Consolidate And Enhance The Document Management Processes Within Basc. 8. Trouble Ticketing System – Provides Centralized Incident/problem Reporting, Coordinated Troubleshooting, Assignment, Tracking, Knowledge Base Documentation, And Customer Communication Streams To Rapidly Restore Technology Performance And Availability While Optimizing Resource Efficiency And Minimizing Disruptions Across Users And Business Operations. 9. Queueing / Appointment System – A Solution Designed To Streamline And Enhance The Way Universities Handle Queues And Appointments For A Wide Range Of Services. 10. Executive Information System – Selectively Aggregate, Analyze, And Visualize Kpis On Vital Organizational Statistics From Integrated Bi Dashboards Tuned To Strategic Objectives To Reveal Insights Driving Informed Decisions And Management By Exception For Optimized, Data-driven Governance And Outcomes. 11. Campus Portal System - This Should Encompass Intranet Platforms Facilitating Single Sign-on Access For Faculty, Staff, And Administrators. These Portals Practically Incorporate Critical Academic Resources, College Services, And Administrative Systems For Their Respective Roles. 12. University Library System – Consolidates The Management Of Physical And Digital Resources On Campus. These Include Discovery Layers, Circulation, Patron Records, Book/media Cataloging, And User Usage Analytics. 13. Econference Room With Video Conferencing – A Solution Designed To Streamline And Enhance The Institution By Facilitating Seamless Real-time Communication Between Individuals Or Groups In Different Locations. Reporting And Any Associated Sub-modules Thereof May Be Necessary. Ii. Project Objectives A. General Objectives The Main Objective Of Bulacan Agriculture State College (basc) Is To Enhance The Educational Experience, Improve Campus Operations, And Address The Needs Of Students, Faculty, And Staff In An Efficient, Sustainable, And Forward-thinking Way. The System Shall Be Securely Accessible By All Stakeholders Anytime And Anywhere. B. Specific Objectives The Project Aims To Provide A System With The Following Features: • The System Must Promote The Virtue Of Transparency. • The System Runs On An Internet-based Application. • The System Is Available On Both Android And Ios Mobile Devices. • The System Should Record And Track Potential Students From Their First Inquiry To Enrollment. • The System Should Record And Calculate Grades, As Well As Facilitate The Transmission Of Grades To The Dean’s And Registrar’s Office. • The System That Manages Academic Records, Courses, And Academic-related Information For Students. • The System Should Record Each Student's Class Attendance And Allow The Teachers To View It. • The System Should Have A Dashboard For Quickly Identifying The Total Quantity Of Tasks, Assignments, Tests, Quizzes, Finished Projects, And Subjects For Each User. • The System That Handles The Student’s Enrollment Charges, Accounts Receivable, Payment, And Adjustment Of Student’s Fees. • The System Should Have An Online Registration That Automatically Assesses Fees. • The System That Can Manage The Payments Of The Students Includes Printing Official Receipts And Cashier Settings. • The System Can Manage Registrar Department Transactions From The Submission Of Records, Enrollment Up To Graduation, And The Issuance Of Transcript Of Records Of Students. • The System That Can Manage And Monitor Students’ Health And Well-being. • The System Can Display Upcoming Events, Announcements, And News. • The System Handles The Alumni Master File And Enables The User To Create, Edit, And Update The Alumni Profile. • The System Can Enable Parents To Monitor The Activities And Progress Of Their Children. • The System Is Accessible Anywhere, Anytime. • The System That Is User-friendly. The Proposal To Be Submitted Shall Include The Following: • Executive Summary. O Cost Of The System O Advantages Of The Proposal • Company Information • Solution Overview O Solution Architecture O High-level Component Description • Process Flows • Detailed Description Of Sub-system • Technical Specification • Dimensioning • Web-based System • Mobile Web Access (android And Ios) • Project Workshop • Performance Management • Hardware And Site Information • Installation And Trainin Iii. Scope Of Work The Project Comprises Several Phases Of Development And Implementation. It Includes Not Only The Provision Of The Software Development/customization Services, Hardware, And Network With Accessories But Also Support Services, Necessary To Achieve The Project’s Objective. A. Systems Analysis This Phase Covers The Data Collection Process In Order To Improve The Efficiency Of Related Systems In Basc. The Process Includes But Is Not Limited To The Following: 1. Data Gathering, Consultation, And Evaluation Of Existing Systems-related Information Management Systems In Basc. 2. Documentation, Assessment, And Testing Of The Existing Basc Processes. 3. Preparation, Assessment, And Evaluation Of The Current Database Of The Existing Systems. 4. Identification Of Issues, System Requirements, And Development Opportunities Of The Existing Versus The Proposed System. 5. Data Migration Plan, Execution Plan, Reversion Plan, Backup Plan, And Verification Process From Existing Database To New Database. 6. Actual Migration And Verification Of Data. 7. Executions Of Backup Plan. 8. Post-migration Verifications. 9. Capacity Planning. 10. Knowledge Transfer B. Systems Design And Development Supply, Install, And Implement A System Upgrade For Availability To A Web, Desktop, And Mobile Version, Inclusive Of (2) Two Years Of Software And Maintenance Support. The Solution Shall Include The Following Modules And Sub-modules Of The System Software: The Development/customization Of The System Consists Of But Is Not Limited To The Five Functionalities: (a) Information Management; (b) Provision Of Statistical Chart On Dashboard; (c) Service Status Monitoring; (d) Security Management; (e) Reporting And Any Associated Sub-modules Thereof As May Be Necessary. B.1 Pre-requisite Setup Module ● University Information Settings ● Secured Access Management ● Module To Set Organizational Units With The Following Hierarchy ○ University > Campus > College > Department ○ Approval Level Hierarchy ● The Admission Setups Should Have The Following: Document Types, Application Types, Admission Limits, Entrance Exams, Entrance Exam Schedules, Interview Schedules, Medical Schedules. ● Furthermore, Clinic Records Management Setups That Play A Vital Role In University Operations. ● Clearance Management Setups ● Learning Management Settings ● Secured Access Management ● It Should Have A Configuration Grading Parameters, Rubrics Matrix Of The Activities, Major Course Output (mco), Syllabus, And Lesson Plans. ● Cashiering Settings ● Secured Access Management ● Cashiering Setup: Must Allow Setting Up Customer Master Data, Accounts Group, Sub Groups, Discounts, Collection Of Terms Settings, And Interests, Fines, & Penalties Settings. ● Human Resource Management Settings ● Secured Access Management ● Holiday: Holiday Types And Holidays ● People Attributes: Talents, Hobbies, And People Relationships ● Hr Settings: Employment Types, Positions, And Leave Types ● Schedule Settings: Schedule Templates And Schedule Parts ● Government Settings: Withholding Tax, Sss, Philhealth, Pag-ibig, Gsis. ● Salary Grades: Salary Grades And Salary Level ● Default Leave Types: Manage Default Leave Types, Which Are Used For Easy Assignment Of Leaves To Employees (e.g., Regular, Jo, Casual, Oyster, And Part-time Employees) ● Training And Seminar: Manage Training And Seminar; Use For Easy Training, Seminar, Certification, And Workshop Creation. ● Manage Suspension Types ● Manage Termination Types ● Payroll Settings ● Secured Access Management ● Mandatory Deductions: ○ Withholding Tax ○ Philhealth Contribution ○ Pag-ibig Contributions/home Development Mutual Fund (hdmf) ○ Gsis Contribution ● Loans ○ Gsis Mpl (multi-purpose Loan) ○ Gsis Gfal (governmentfinancial Assistance Loans) ○ Gsis Housing Loan ○ Gsis Policy Loan ○ Gsis Computer Loan ○ Gsis Salary Loan ○ Gsis Consolidated Loan ○ Gsis Emergency Loan ○ Gsis Educational Loan ○ Gsis Old Loan ○ Pag-ibig Housing Loan ○ Pag-ibig Multi Purpose Loan ○ Pag-ibig Calamity Loan ○ Grocery Loan ○ Koop ○ Hospital Bills Loan ○ Psmb Fund ○ National Home Mortgage Finance Corporation(nhmfc) ○ Provident Fund ○ Land Bank Of The Philippines(lbp) Salary Loan ○ Unlimited Optional Life Insurance (uoli) ○ Development Bank Of The Philippines (dbp) Loan ● Other Deductions ○ Absences/lates ○ Sss Contribution ○ Gsis Optional Insurance ○ Pag-ibig Mpii ○ Child Support ○ Philhealth Up ○ Additional Tax ○ Basc Personnel Credit Cooperative (pcc) ○ Basc Faculty And Employee Association (fea) ● Other Income ○ Overtime (e.g., Normal O.t., Rest Day O.t., Holiday O.t., Non-working Holiday O.t., And Special Non-working Holiday O.t.) ○ Night Differential ○ Salary Adjustment ○ Pera (personnel Economic Relief Allowance) ○ Meal Allowance ○ Fitness Allowance ○ Transportation Allowance ○ Rice Allowance ○ Uniform Allowance ○ Laundry Allowance ○ Communication ○ Internet Allowance ○ 13th Month ○ Bonus Pay ○ Retirement Pay ● Assets And Fleets Management Settings ● Secured Access Management ● Asset Groups ● Asset Categories ● Asset Types ● Asset Articles ● Annual Procurement Plan (app) / Project Procurement Management Plan (ppmp) ● Document Management Settings ● Secured Access Management ● Delivery Type ● Document Category ● Document Security Level ● Document Type ● Process Flow ● Trouble Ticketing Settings ● Secured Access Management ● The Solution Must Have A Maintenance Module For Category Settings. ● The Solution Must Have A Maintenance Module For System Settings. ● The Solution Must Have A Maintenance Module For Types Settings. ● The Solution Must Have A Maintenance Module For State Settings. ● The Solution Must Have A Maintenance Module For Impact Settings. ● The Solution Must Have A Maintenance Module For Urgency Settings. ● The Solution Must Have A Maintenance Module For Team Settings. ● Executive Information Settings ● Secured Access Management ● Dashboard Configuration And Control ● Campus Portal Settings ● Secured Access Management ● Basc Active Directory W/ Configuration ● Themes Configurations ● University Library Settings ● Secured Access Management ● Access Control ● Library Locations ● Shelves Mapping ● Call Number/book Mapping ● Queueing/appointment Settings ● Secured Access Management ● The Solution Must Have An Office/department Setups To Manage The List Of Office/departments. ● The Solution Must Have A Service Set Up To Handle The List Of Services. ● The Solution Must Have Window Settings To Manage The Window List. ● The Solution Must Have Window-type Setups To Control The Queueing System Window Types. ● The Solution Must Have Marquee Setups To Configure The Footer Data Or Information. ● The Solution Must Have Printer Setups To Manage The List Of Printers. ● The Solution Must Have Advertisement Setups To Manage The List Of Advertisements. B.2 University Information System ● Academics ● The Solution Must Enable The Setup Of Courses, Sections, Course Programs, And Curriculum. ● The Solution Must Include A Course Master List To Manage And View Course Information, Course Program Inclusion, And Section Details. ● The Solution Must Include A Master List Of Course Programs To Streamline The Management And Viewing Of Course Program Information, Curriculum Details, And Curriculum Structure. ● The Solution Must Include A Curriculum List To Easily Manage And View Academic Progression Or Flowchart. ● Enrollment Module ● The System Must Have An Online Registration With Automatic Assessment Of Fees, Interconnected With The Other Modules To Facilitate The Automatic Course Advising. ● The System Must Have A Monitoring Of Section Fill Rates. ● The System Must Have A Post-enrollment (adding/changing/dropping) Module. ● The System Must Support Automatically Generating A “list Of Allowed Subjects And Schedules To Be Taken”. ● The System Must Support The Ability To Prevent Choosing Subjects With Prerequisites Not Yet Taken. ● The System Must Support The Ability To Show The Maximum Number Of Allowed Units A Particular Student Can Enroll In Based On Previous Semester Grades With The Capability To Add And Decrease Units By The Registrar Department. ● The System Must Support Enlistment To Rotc And Pe Subjects. ● The System Must Support The Automatic Generation Of Assessment Slips And Registration Slips. ● The System Must Have A Curriculum Auditing. ● The System Must Support Students' Online Queries Of Available Subjects. ● The System Must Support The Generation Of Reports Such As A Summary Of Enrolled Students. ● Section Management Module ● The Solution Must Be Able To Assist In Creating Multiple Sections For Courses To Accommodate Varying Class Sizes, Instructor Availability, And Scheduling Preferences. ● The System Must Aid In Managing Instructor Workloads To Ensure Equitable Distribution Of Teaching Assignments And Compliance With Contractual Obligations. ● The Solution Must Provide Real-time Updates And Notifications To Students, Faculty, And Staff Regarding Changes To Class Schedules, Room Assignments, Or Instructor Assignments. ● The System Must Be Able To Generate Reports On Room Utilization, Resource Usage, And Scheduling Patterns To Inform Decision-making And Resource Allocation. ● The Solution Must Be Able To Enroll Students In Courses And Sections Using Normal Scheduling Techniques While Supporting Non-standard Term Arrangements. ● The System Must Be Able To Generate Schedules For Both Students And Professors. ● Admission Module ● The Solution Must Allow The Creation Of Applications For Potential Students. ● The Solution Must Contain A List Of Applicants To Easily Manage/view The Applicant’s Complete Information, Attachments, And Progress Status. ● The Solution Must Allow The Setting Of Admission Limits To Know The Number Of Allowed Applicants Quickly. ● The Solution Must Allow Applicant Pooling That Is Printable. ● Must Have A List Of Applicants Scheduled For The Entrance Exam, Interviews, And Medical. ● The Solution Must Be Able To Customize The Requirements Of Students For Admission. ● Must Support The Fast Generation Of Reports For The List Of Applicants. ● Grade Management Module ● The System Maintains Complete Records Of The Academic Grades Of The Students. ● The System Must Facilitate Academic Grade Crediting For Transfer Students. ● The System Must Have A Module To Handle Effortless Reviews Of Grades Submitted By Faculty Members. ● The Students Must Be Able To View Their Historical Grades Anytime Thereby Replacing Class Cards. ● Registrar Module ● Must Have Tools To Monitor And Manage Various Operations Of The Registrar Like Monitoring Screen For Records, Certification, And Documents Requested By Students And Alumni. ● Must Contain Complete Student Information, Academic Data File, And Scanned Submitted Documents Of Students. ● Must Support The Fast Generation Of Tor, Cor, Rog, And Form 9 ● Must Be Capable Of Generating A List Of Candidates For Graduation, Scholarships, And Honors. ● The Solution Must Allow The Generation Of The Following Reports: Academic Evaluation, Official List Of Enrollment, Diploma, Registration, Shiftee, Student Directory, Subject Masterlist, And Summary Of Enrollment Reports. ● Must Be Able To Apply Tags To Documents Being Submitted By New Enrollees And Remind The User Of Documents That Students Need To Submit. ● Must Have The List Of Student Subsidy And Adding Of Students For The Scholarship. ● The System Must Be Capable Of Correcting Student Grades. ■ Students With An 'incomplete' (inc) Grade Will Have One Year To Fulfill Requirements To Update Their Grades; Otherwise, The Grade Will Be Changed To A Failing Grade. ● Student Services ● Must Allow Teachers To Submit Requests For Grade Corrections In Case Of Errors Or Discrepancies In Their Recorded Grades. ● The Solution Must Facilitate Tracking The Progress Of Such Requests And Include Checks To Ensure The Necessary Supporting Documentation Is Provided. ● The Grade Correction Request Must Be Reviewed And Approved By Relevant Faculty Members And The Registrar. ● The Solution Must Allow Students To Request Essential Documents Such As Copies Of Report Cards And Academic Certifications For Various Purposes (e.g., Employment, Further Education, Or Personal Records.) ● The Solution Must Allow Students To Specify The Details Of Their Requests (e.g., Number Of Copies, Type Of Document, Purpose) And Provide Estimated Processing Times. ● The Solution Must Notify The Students About The Status Of Their Requests, From Submission To Approval And Document Issuance. ● The Solution Must Have A Feature That Supports Students To Request For Change Of Their Course Or Program Of Study. ● The Solution Must Have A Process That Involves Submitting A Detailed Request, Including The Reason For The Change And Relevant Supporting Information. ● Alumni Module ● The Solution Must Have An Alumni Module That Can Populate The Alumni Master File. ● The System Must Have A Record That Can Be Utilized To Contact The Alumni. ● The Solution Must Be Able To Update Alumni Information. ● The Solution Must Be Able To Search The Directory Of Alumni. ● The Solution Must Be Able To Update The Alumni Profile. ● Scholarship Management ● The System Must Serve As A Central Repository For All Scholarships. ● The Solution Must Handle Recurring Scholarships, Including Reminders To Renew. ● The Solution Must Provide Tools To Automatically Monitor Compliance With Scholarship Conditions (e.g., Gwa Maintenance). ● The System Must Be Integrated With Academic Records And Financial Systems For Validation. ● The System Must Be Able To Provide Real-time Application Status Tracking For Students. ● Awards And Distinction Management ● The System Must Provide A Streamlined Management Of Awards Through Automation. ● The System Must Be Able To Support Multiple Types Of Awards (e.g., Academic Excellence, Leadership, Research, Sports, And Cultural Activities) ● The System Must Be Able To Select Recipients By Committees. ● The System Must Be Able To Ensure Adherence To University Policies And Regulations Regarding Awards. ● The System Must Provide Fields To Define Award Qualifications (e.g., Gwa Thresholds, Competition Results, Or Nomination-based Recognitions) ● Academe Module ● The System Must Provide An Overview Of The Academic Organizational Chart Of The University's Faculties. ● Curriculum Module ● The System Must Provide Tools For Designing And Structuring Academic Programs, Including Defining Course Sequences, Corequisites, And Prerequisites ● The System Must Allow The User To Maintain A Comprehensive Catalog Of Available Academic Programs, Including Undergraduate Majors, Minors, Graduate Programs, And Certificates. ● Acts As A Map Between Program Learning Goals And Course Learning Objectives To Guarantee Coherence And Alignment Across The Curriculum. ● Block Sections Management Module ● The System Must Be Able To Efficiently Manage Student Groupings (block Sections) For Better Academic And Administrative Coordination. ● This Module Manages Predetermined Groupings Of Students Who Attend Classes Together For The Entirety Of A Course Or Academic Program. ● This Module Must Be Able To Automatically Assign Students To Sections Based On Predefined Rules, Such As Enrollment Data, Course Requirements, And Class Size Limits. ● Short Courses Management Module ● This Module Offers Enrollment Information, Fees, And Course Content For Tesda Courses And Other Modules. ● The System Should Include A Student List, Class Schedules, Faculty Assignments, Assessment Results, And The Issue Of Training Certificates, As Well As Other Data On Short-term Courses. ● Clinic Records Management Module ● The System Must Have A Component Designed To Facilitate The Management Of The Clinical Records Of The Students And The Dispensing Of Clinic Items. B.3 Learning Management System ● Administration Module ● The System Must Show Interactive Analytics ● The System Must Allow The Customization Of The Grading Transmutation. ● The System Must Allow The Customization Of The General Passing Percentage. ● Professor Module ● The System Must Show Interactive Analytics ● The System Must Automatically Retrieve The Classes Assigned To Teachers. ● The System Must Automatically Retrieve The List Of Students Enrolled In Each Class. ● The System Must Allow Teachers To Manage The Student Attendance Records. ● The System Must Support The Creation Of Lessons And The Attachment Of Related Files, Including Modules, Powerpoint Presentations, Excel Spreadsheets, Pdfs, Word Documents, Text Files, Videos, And Images. ● The System Must Permit The Addition Of User Activities, Such As Assignments, Projects, Quizzes, And Exams. ● The System Must Be Capable Of Creating And Generating A Rubric To Provide Clear Expectations For Each Evaluation Criterion. ● The System Must Be Capable Of Generating The Student Portfolio For A Range Of 3 To 5 Years. ● The System Must Be Able To Archive The Students' Assignments, Projects, Quizzes, And Exams. ● The System Must Be Able To Have A Grade Consultation ● The System Must Allow Teachers To Set Time Limits For Activity Questions. ● The System Must Be Capable Of Preventive Measures For Cheating. (e.g. Disabling Screenshots) ● The System Must Enable The Configuration Of Date Ranges For Users To Complete Assigned Activities. ● The System Must Be Able To Set Schedules And Deadlines For Posting The Activities, And Quizzes. ● The System Must Allow The Shuffling Of Quizzes And Exam Item Numbers And Answers. ● The System Must Provide Immediate Visibility Of Scores On Activities Upon Completion. ● The System Must Allow The List Of Created Questions To Be Viewable And Editable By The Activity Creator. ● The System Must Support The Creation Of Lessons And Quizzes One At A Time, All With The Same Subject Description. ● The System Must Allow The Teachers To View The Grades Of His/her Students. ● The System Must Allow The Teachers To Generate Reports For Each Class. ● Student Module ● The System Must Show Interactive Analytics ● The System Must Have A Dashboard To Easily Identify The Total Number Of Completed Activities, Assignments, Quizzes, Exams, Projects, And Subjects Per User. ● The System Must Allow Students To Change Their Passwords And Usernames During Their Initial Login. ● The System Must Provide A Newsfeed Feature To Display Upcoming Events And The School's Mission And Vision. ● The System Must Enable Students To Upload Profile Pictures. ● The System Must Support Live Chat And Messaging Functionality Between Students Of The Class. ● The System Must Automatically Post Classes In Which A Student Is Enrolled To Their User Account. ● The System Must Support User/class Attendance Tracking Within The Learning Management System (lms). ● The System Must Enable File Attachments To Lessons That Are Downloadable To The Users' Devices. ● The System Must Allow Students To View The Results Of Their Activities. ● The System Must Ensure That Detailed Activity Results Are Posted. ● The System Must Include An Activity Stream To Summarize The Recent, Upcoming, Later, And Missed Activities Providing An Overview Of A Student's Activity Status. ● The System Must Include Notifications When There’s New Activity Uploaded, Modifications, And Grade Posting. ● The System Must Provide Visibility Into Student Ranking. ● Parents Module ● The System Must Enable Parents To Monitor The Activities And Progress Of Their Children Within The System. ● The System Must Support The Addition Of Children With No Limitations, With An Auto-identification Feature. ● The System Must Comply With The Data Privacy Act. ● Student Transcript Module ● The System Must Have An Academic Record Or Course Management ● The System Must Play A Crucial Role In Managing And Organizing Academic-related Information For Students. ● The System Must Have A Module That Focuses On Tracking And Displaying Details Related To Individual Courses, Classes, And Academic Progress. B.4 Cashiering System ● Cashier Module ● The System Must Be Capable Of Setting Up The Assessment Fees. ● The System Must Be Able To Keep A Record Of A Student's Soa And Its Current Status Whether It’s An Active Soa Or Inactive. ● The System Must Be Able To Preview Or Print Student’s Soa Based On The Selected Academic Year And Semester. ● The System Must Be Able To Have An Audit Trail For Any Actions Or Activity Made Per Account. ● The System Should Support Walk-in Payments At Physical Locations Whether By Cash Or By Check. It Should Enable The Manual Entry Of Payment Details And Generate Receipts. ● The System Must Be Capable Of Identifying Eligible Students Based On Predefined Criteria And Offer A Range Of Financial Incentives, Including Scholarships, Fee Reductions, And Grants. It Must Also Establish An Efficient Application And Selection Process While Promoting Transparency And Fairness In Awarding Scholarships. B.5 Human Resource Management System And Timekeeping System ● Employee Management Module ● The System Must Be Able To Provide A Single Repository Where All Employee Records Are Stored, Updated, And Maintained. ● The System Must Be Able To Reflect Any Updates Or Changes Made To The Master Database Across All Modules. ● The System Must Be Able To Allow Linkage Of Personnel Files To The University Information System. ● The System Must Be Able To Prepare And Generate An Employee Masterlist. ● The System Must Be Able To Set Up Organizational Units With A Hierarchy. ● The System Must Be Able To Provide A Viewable Organizational Chart Of The University, Which Is Linked To The Employee Plantilla Records. ● The System Must Be Able To Manage Employees Based On Their Plantilla Numbers. ● The System Must Be Able To Organize The Employee Hierarchy By Rearranging The Plantilla Numbers Of Specific Employees Through A Drag-and-drop Interface. ● The System Must Be Able To Provide Employee Self Service For The Following: ■ Request To Update Profile. ■ Receive Notifications, News, And Announcements. ■ View Attendance. ■ View Schedule. ■ View Leave Balances, Benefit Balance, And Ledgers. ■ View Monthly Net Pay Summary/payslip. ■ Request Dtr Correction. ■ Submit Requests For Leave, Overtime, Business Trip, And Six Days Of Work. ● The System Must Be Able To Record And Generate Audit Trail Reports. ● Time-keeping Monitoring Modules ● The System Must Be Able To Link With The Biometrics Attendance System. ● The System Must Be Able To Link With The Payroll Management System. ● The System Must Be Able To Do Auto-tracking Of Sick Leave And Vacation Leave Balances. ● The System Must Be Able To Monitor Regular And Special Holidays With Automated Computation Of Pay Rates. ● The System Must Be Able To Prepare A Summary Of Attendance And Absences. ● The System Must Be Able To Prepare A Summary Of Overtime For Validation And Approval. ● The System Must Be Able To Provide A Calendar Of Approved And Pending Leave Requests. ● The System Must Be Able To Set Up Holidays Such As But Not Limited To Recurring Regular-holidays And Special Non-working Holidays. ● The System Must Be Able To Set Up Template Schedules To Be Assigned To A Bulk/group/ Per Employee. ● The System Must Be Able To Record And Generate Audit Trail Reports. B.6 Payroll Management System ● Automated Payroll System ● The System Must Be Able To Provide The Analytics Of Payroll Reports With Real-time And Accurate Data. ● The System Must Be Able To Display, Create, And Manage Payroll Period/s For Generating Payroll Reports. ● The System Must Be Able To Create And Manage Payroll Groups And Assign Employees To Their Payroll Groups Accordingly. ● The System Must Be Able To Set Bank Details And Salary Pertaining To The Corresponding Employee’s Job Type, Salary Grade, And Step. ● The System Must Have A Feature That Customizes And Manages Employees’ Allowances, Deductions, Loans, And Other Compensation Components. ● The System Must Be Able To Export Files For All Tables/lists Within The Payroll System (e.g., Employee Lists, Payroll Reports For A Certain Period, And Others). ● The System Must Have A User Access Control Wherein The Administrator Can Manage Who Can View, Edit, And Delete The Employee And Payroll Information. ● The System Must Be Able To Track Audit Logs Including Who Accessed The System And Made Changes. ● The System Must Have A Feature For Providing Alerts And Notifications Regarding Updates About Generating Payroll Reports And Releasing Payslips. ● The System Must Be Able To Archive Data With Complete Accessibility For Future Reference. ● The System Must Have A Feature That Allows The User To Have Backup And Recovery To Maintain Historical Payroll Records For Auditing And Compliance Purposes. ● Mandatory Deductions And Contribution Module ● The System Must Be Able To Accurately Calculate And Deduct Mandatory Contributions Such As Gsis Contribution, Philhealth, Pag-ibig, And Withholding Tax. ● The System Must Be Able To Integrate With The Latest Bir Tax Tables To Ensure Compliance With Tax Regulations. ● The System Must Be Able To Automatically Generate Reports For Government Agencies. ● Other Deductions Module ● The System Must Allow Flexible Customization Of Other Deductions. ● The System Must Have A User-friendly Interface For Easy Input And Management Of Deduction Rules. ● Other Income Module ● The System Must Be Able To Accommodate Various Types Of Other Income. ● The System Must Be Able To Calculate The Appropriate Tax. ● Loans Module ● The System Must Be Able To Allow The Creation And Tracking Of Different Loan Types With Varying Interest Rates And Repayment Terms. ● The System Must Be Able To Automatically Compute Loan Amortization And Deduct Payments From Employee Salaries. ● The System Must Be Able To Automatically Update Loan Balances And Remaining Dues. ● Attendance Module ● The System Should Be Able To Record Employee Attendance And Generate Accurate Time And Attendance Reports. ● The System Must Be Able To Calculate Overtime, Night Differential, And Other Time-based Compensations. ● Bank Transmittal ● The System Must Be Able To Generate Accurate Bank Files For Payroll Disbursement. ● The System Must Be Compatible With Various Bank Formats To Ensure Seamless Integration With Banking Systems. ● Integration To Time Keeping Monitoring Module ● The System Must Be Able To Connect And Communicate With The Biometrics Attendance System. ● The System Must Be Able To Provide Automated Tracking Of Sick Leave And Vacation Leave Balances Of Employees. ● The System Must Be Able To Monitor Regular And Special Holidays With The Inclusion Of An Automated Computation Of Pay Rates. ● Integration To Hris System ● The System Must Be Able To Integrate Data With The Human Resources Information System (hris) For The Employees’ Relevant Data Including Basic Information, Job Position, Salary Grade, And Bank Details. ● The System Must Be Able To Integrate Data With Hris To Track Employee Work Hours, Including Regular Hours, Overtime, Absences, And Leave Requests. B.7 Assets & Fleet Management System ● Asset Management System ● The System Must Be Able To Show And Manage The General Information, Vendor Details, Warranty Information, Financial Info, And Depreciation Info. ● The System Must Be Able To Show The Operational Cost And Progress Of The Asset Requests. ● The System Must Be Able To Show Operational Costs And Progress Of The Asset Update. ● The System Must Be Able To Show The Operational Cost And Progress Of The Asset Auction. ● The System Must Be Able To Show Operational Costs And The Progress Of The Repair And Maintenance. ● The System Must Be Able To Show The Operational Cost And Progress Of The Decommissioning. ● The System Must Be Able To Show Operational Cost And Progress Of The Disposal. ● The System Must Be Able To Show The Operational Cost And Progress Of The Asset Issuance. ● The System Must Be Able To Show The Operational Cost And Progress Of The User Transfer. ● The System Must Be Able To Create, Update, And Delete Assets With Their Respective Information. ● The System Must Be Able To Create A Comprehensive Inventory Of All Assets, Including Physical Equipment, Software, Licenses, And Other Resources. Each Asset Is Typically Associated With Relevant Information Such As: ■ Article (laptops, Furniture, Or Journals) ■ Property Number ■ Assigned Number ■ Purchase Date ■ Vendor Name ■ Service Provider (optional If Different As To Vendor Name) ■ Financial Information ■ Required Documents (e.g., Purchase Request) ● The System Must Be Able To Track The Movement And Changes In The Status Of Assets. This Includes: ■ Recording Of Asset Transfers ■ Disposal ● Fleet Management System ● The System Must Be Able To Show And Manage General Information, Vehicle Registration Details, Vendor Details, Warranty Information, Financial Info, And Depreciation Info. ● The System Must Be Able To Show Operational Costs And The Progress Of The Fleet Requests. ● The System Must Be Able To Show Operational Costs And Progress Of The Fleet Update. ● The System Must Be Able To Show The Operational Cost And Progress Of The Fleet Auction. ● The System Must Be Able To Show Operational Costs And Progress Of The Repair And Maintenance. ● The System Must Be Able To Show The Operational Cost And Progress Of The Decommissioning. ● The System Must Be Able To Show Operational Cost, And Progress Of The Disposal. ● The System Must Be Able To Show Operational Cost, And Progress Of The Fleet Issuance. ● The System Must Be Able To Show Operational Cost, And Progress Of The User Transfer. ● The System Must Be Able To Show A Statistical Overview Of Fleets According To Its Categories And Types (e.g., Motorcycles, Service Vehicles, Heavy Equipment). ● The System Must Be Able To Have An Elaborative List Of Records Of All Fleets And Their Corresponding Information. ● The System Must Be Able To Have Integration With The Asset Management System To Be Able To Handle Instances Of Assets Being Carried On A Vehicle, Allowing Easier Management, Monitoring, And Inventory. ● The System Must Be Able To Create A Comprehensive Inventory Of All Fleets. Each Fleet Is Typically Associated With Relevant Information Such As: ■ Article (service Vehicle, Car, Heavy Equipment) ■ Body No./ Plate No./ Conduction Sticker No. ■ Assigned Department ■ Registration Information ■ Vendor Information ■ Insurance Information ■ Financial Information ■ Depreciation Information ■ Attachments ● Requisition And Issuance Slip ● Par ● Purchase Request ● The System Must Be Able To Have A Feature That Schedules And Tracks Vehicle Maintenance, Including Oil Changes, Tire Rotation,s And Physical Inspections. ● Inventory Management Module ● The System Must Be Accountable For Tracking, Managing, And Maintaining Various Assets And Fleets Owned Or Used By The Academic Institution. ● The System Must Be Able To Maintain A Centralized Database Of University-owned Resources, Including Computers, Equipment, Furniture, And Other Tangible Assets. B.8 Document Management System ● Document Management System (dms) ● The System Must Be Able To Track Both Physical And Electronic Documents. ● The System Must Be Able To Store Electronic Documents, Such As Pdfs, Word Processing Files, And Digital Images Of Paper-based Content. ● The System Must Be Able To Be A Centralized Repository Where Documents Can Be Easily Searched, Accessed, And Updated By Authorized Business Users. ● The System Must Be Able To Define The Recipient’s Routes With Information Such As Time & Date Sent, Time & Date Received, And Remarks. ● The System Must Be Able To Save/download Uploaded Attachments. ● The System Must Be Able To Generate Tracking With A Unique Batch Number As A Tracking Reference. ● The System Must Be Able To Provide Easier Identification Of Status For Users By Using Color Codes. ● The System Must Be Able To Send System Notifications On Printing Barcodes, Tracking Status Changes, Receiving Recipients, And Other System Actionable Functionalities. ● Process Flow Management ● The System Must Allow For The Customization Of Workflows To Accommodate Various Document Types And Other Business Processes. ● The System Must Offer A Visual Interface, Such As A Dashboard, To Display And Monitor Process Flows Efficiently. ● Routing Management ● The System Must Be Able To Automate The Routing Of Documents To Appropriate Individuals Or Departments Based On Predefined Rules And Flow. ● The System Must Be Able To Allow For Dynamic Routing, Where Documents Can Be Rerouted As Needed. ● The System Must Be Able To Provide Real-time Notifications To Users Upon Receipt Of A Document. ● The System Must Be Able To Include A History Log To Track The Routing Path For Auditing Purposes. ● Integration To Hris ● The System Must Be Able To Seamlessly Integrate With The Organization's Hris To Access Employee Information, Such As Names, Email Addresses, And Department Affiliations. ● Barcode Printing Module ● The System Must Be Able To Print Barcode Labels In Batches With A Unique Tag/number. ● The System Must Be Able To Provide Accurate Status Of The Document Based On The Printed/attached Barcode. ● Security Module ● The System Must Be Able To Record The Audit Trail For All The User Actions Inside The System. ● The System Must Provide Document Security And Access Control Depending On The Security Level. ● The System Must Be Able To Create/update Accounts And Give Them Access Rights Depending On The Business User's Role. B.9 Trouble Ticketing System ● Incident Ticket Management ● The System Must Be Able To Create A New Incident Ticket. ● The System Must Be Able To Identify Related Incident Tickets Based On Category, Type, System, And Description During Creation. ● The System Must Be Able To Assign The Incident Ticket To The Appropriate Team Based On The System Defined In The Assignment Rules. ● The System Must Be Able To Filter Incident Ticket Lists Based On State (e.g., Open, In Progress, Hold, Resolved, Closed, And All). ● The System Must Be Able To Show An Overview Of Incident Ticket Statistics, I.e.; ■ Open ■ Inprogress ■ Overdue ■ Overview Of Incident Ticket By Severity And State ● The System Must Be Able To Capture The Notes, Attachments, And Resolution Information. ● The System Must Be Able To Notify The Team Member To Whom The Ticket Is Assigned. ● The System Must Be Able To Notify The Team Manager To Whom The Ticket Is Assigned Whenever A Critical Ticket Is Created. ● Problem Ticket Management ● The System Must Be Able To Create A New Problem Ticket. ● The System Must Be Able To Create A New Problem Ticket From An Existing Incident Ticket. ● The System Must Be Able To Identify Related Tickets Or Problem Tickets Based On Category, Type, System, And Description During Creation. ● The System Must Be Able To Assign The Problem Ticket To The Appropriate Team Based On The System Defined In Assignment Rules. ● The System Must Be Able To Filter Problem Ticket Lists Based On Status (e.g., Open, In Progress, Hold, Resolved, Close,d And All). ● The System Must Be Able To Show An Overview Of Problem Ticket Statistics, I.e.; ■ Open ■ Inprogress ■ Overdue ■ Overview Of Incident Ticket By Severity And State ● The System Must Be Able To Capture The Notes, Attachments, Analysis, And Resolution Information. ● The System Must Be Able To Notify The Team Member To Whom The Ticket Is Assigned. ● The System Must Be Able To Notify The Team Manager To Whom The Ticket Is Assigned Whenever A Critical Ticket Is Created. ● Security Module ● The System Must Ensure That Only Authorized Personnel Can Access And Modify Tickets. ● The System Must Maintain A Detailed Audit Trail Of All Actions Taken On A Ticket To Ensure Accountability And Traceability. B.10 Queueing / Appointment System ● Queueing Admin Module ● The System Must Be Able To Allow Administrators To Manage And Monitor The Entire Queueing Process And Appointments. ● The System Must Be Able To Apply The Concept Of Calling Population To Determine And Measure The Arrival Process Of Customers. ● The System Must Be Able To Have Its Service Counters, Its Own Common Queue, And The Probability Distribution Of Customers’ Service Time. ● The System Must Be Able To Have The First-in-first-out (fifo) Approach To Have A Systematic And Consistent Flow To Maximize The Throughput Of The Customer Service Center. ● The System Must Be Able To Measure The Logical Ordering Of Customers In A Queue And Determine Which Customer Will Be Chosen For Service When The Service Counter Becomes Free. ● The System Must Be Able To Measure Performance Based On Steady-state Average Delay And Steady-state Average Waiting Time In The System. ● The System Must Be Able To Measure The Conversation Steady State Time Average Number In The Queue And The Steady State Time Average Number In The System. ● The System Must Be Able To Administer Parallel Management Through Multiple Counters By Navigating The Queue And Finding The Appropriate Counter For Their Needed Service. ● The System Must Be Able To Allow The Customers To Request Services Without Being Physically Present Throughout The Waiting Time Of The Lineup Of Customers. ● The System Must Be Able To Give Freedom To The Customers To Wait Outside The Premises Of The Branch Upon Enabling Virtual Sign-up. ● Admin Appointment Module ● The System Must Be Able To Manage And Oversee The Scheduling, Modification, And Cancellation Of Appointments. ● Local Kiosk Module ● The System Must Be Able To Provide A Self-service Station That Allows Users (clients, Customers, Or Employees) To Interact With The System For Tasks Like Check-ins, Appointment Booking, Ticket Printing, And Managing Their Queue Status. ● Mobile Kiosk Module ● The System Must Be Able To Provide A Mobile-based Self-service Solution That Enables Users To Interact With The System Directly From Their Smartphones Or Tablets. ● Security Module ● The System Must Be Able To Offer Protection For The System And Its Users By Managing Access, Ensuring Data Privacy, And Preventing Unauthorized Actions. ● Appointment System ● The System Must Be Able To Provide Users To Schedule An Appointment According To Their Needs. ● The System Must Gather Needed Information For The Services That The Customer Wants To Avail Or Request. ● The System Must Have The Feature Of Canceling Or Rescheduling A Registered Appointment Within A Specific Period. ● The System Must Have The Feature Of Sending Out A Notification Or Reminder To The Customer Regarding His/her Appointment. ● As An Admin/ Team Member ● The System Must Be Able To Have A Dashboard To Provide An Overview Of Queues And Appointments From The Web And Mobile Web Access Such As: ■ Currently Serving ■ Next Queue Number ■ Next Appointment Number / Priority Lane (pwd, Senior Citizens, Pregnant) ■ Summary ● The System Must Be Able To Provide A Queuing List Including The Queue’s: ■ Status (unserved, Served, Canceled) ■ Queue Date And Time ■ Last Call Date And Time ■ Called By (counter, Name And Position) ■ Actions (view, Recall/call, Start/end, Cancel, Hold) ● The System Must Be Able To Identify Customer Appointment Referrals Including: ■ Id Number ■ First Name ■ Last Name ● The System Must Be Able To Receive Notification/s When A Certain Appointment Needs To Be Accommodated Within A Specific Period. ● The System Must Be Able To Receive Notification/s When An Appointment Has Been Canceled Or Rescheduled. ● The System Must Be Able To Provide Reports And Data Exports In Excel And Pdf Formats. ● The System Must Have Customization Capabilities And A Control Console. ■ Marquee ■ Advertisements On The Tv Screen ● The System Must Be Able To Track The History Of Registered Appointments And Passed Queues. B.11 Executive Information System ● Executive Dashboard Module ● The System Must Be Able To Allow Configurable Layouts, Enabling Users To Choose, Arrange, And Resize Charts To Suit Their Preferences Or Specific Needs. ● The System Must Be Able To Reflect Almost Real-time Information, Ensuring That Executives Are Always Working With The Latest Data. ● Security Module ● The System Should Be Able To Include A Security Module To Ensure Robust Access Control, Data Protection, And Compliance, Safeguarding Sensitive Information And System Integrity Against Unauthorized Access. ● Dashboard Configuration ● This Module Should Allow The Administrators To Create And Configure The Layout And Content Of Dashboards To Reflect Key Business Metrics And Performance Indicators, Ensuring That The Right Data And Accurate Data Are Properly Presented. ● Access Control ● This Module Should Allow The Administrators To Assign Users Or Groups Of Users Who Will Have Access To The Different Dashboards. B.12 Campus Portal System ● Sso-based User Management System ● The System Must Have Sso (single Sign-on) To Enable Users To Authenticate Once And Automatically Gain Access To Multiple Campus Services, Eliminating The Need To Log In To Each Service Separately. This Seamless Authentication Process Must Enhance User Convenience, Improve Security By Reducing The Number Of Passwords Needed, And Streamline Access To Various Tools And Resources, Saving Time, And Effort For Both Students And Staff. ● Basc Active Directory W/ Configuration ● The System Must Allow Centralized User Management Through Active Directory (ad), Which Stores And Organizes Information About Users, Groups, Computers, And Other Network Resources. ● Web Traffic Statistic ● The System Must Allow The Administrators To Monitor Standard Web Traffic Data, Such As Page Views, No. Of Visitors, Geographic Locations, Duration Of Visits, And Referrals, Integrated With Google Analytics (ga4). ● Content Management ● The System Must Allow The Administrators To Manage And Update The Contents Of The School’s Campus Portal Page. Such As Announcements, Blogs, Calendars, Articles, And Activities. B.13 University Library System ● Cataloging And Inventory Management Module ● The System Must Allow The Cataloging And Inventory Management Of The Library's Collection Of Books, Journals, Dissertations, And Other Materials. ● Circulation Module ● The System Must Allow The Librarian To Monitor The Borrowing, Returning, And Renewing Of Library Materials, Ensuring Efficient And Accurate Tracking Of Resources As They Move Between The Library And The Borrowers. ● Acquisition Module ● The System Must Allow The Processing Of Acquiring New Library Resources, Including Books, Journals, E-books, Multimedia Materials, And Other Educational Or Research Content. ● The System Must Allow The Management Of Book Requisitions From Students And/or Teachers. ● Student Module ● The System Must Allow Students To Access New Library Resources, Including Books, Journals, E-books, Multimedia Materials, And Other Educational Or Research Content. ● The System Must Be Able To Provide The Following Information And Services: ■ Book Details (non-dissertation) ■ Book Details (dissertation) ■ My Library Card ■ Request For Purchase/acquisition ■ Reservation ■ Notices Of Due Dates ■ Notices Of Overdue Penalties ● Librarian Module ● The System Must Have A Dashboard That Shows The Librarian’s Crucial Kpis For The Library Such As: ■ Search Word Statistics ■ Tags And Metadata Of The Book Statistics ■ Circulation Statistics ● Student Request List (book Reservation, Purchase Request, Clearance Request, Dissertation Access Request) ■ This Module Must Allow The Students To Submit Various Types Of Requests Related To Their Academic And Campus Activities. ● Book Reservation ■ This Module Must Allow The Students And Faculty To Reserve Library Books Or Materials. ● Purchase Request ■ This Module Must Enable The Students, Faculty, Or Staff To Submit Requests For Purchasing Books, Equipment, Or Other Materials Needed For Academic Or Administrative Purposes. ● Clearance Request ■ This Module Must Enable The Students, Faculty, Or Staff To Submit Requests For Clearance. ● Dissertation Access Request ■ This Module Must Enable The Students, Faculty, Or Researchers To Request Access To Dissertations Or Theses Stored In The Library’s Collection From The Authors. ● Kiosk (self Check-in And Check-out Student) ● The System Allows The Kiosk To Provide Students With A Self-service Station For Managing Their Borrowing And Return Activities. Using Touch-screen Kiosks Or Other Interactive Devices, Students Can Quickly And Efficiently Check Out Library Materials, Return Items, And Access Various Library Services Without Requiring Staff Intervention. ● Integration With Sso Services ● The System Allows Integrating Single Sign-on (sso) Services With An Application Or System, Providing A Unified Authentication Process That Allows Users To Log In Once And Gain Access To Multiple Connected Systems Or Applications Without Needing To Log In Again For Each Service. B.14 Econference Room With Video Conferencing ● Video Conferencing System ● The System Must Be Able To Provide A Seamless And User-friendly Video Conferencing Experience. ● The System Must Enhance Remote Collaboration And Communication. ● The System Must Have Integrated Audio, Video, And Collaboration Tools For Effective Virtual Meetings. ● The System Must Ensure The Scalability And Flexibility To Accommodate Future Needs. B.15 Mobile Version Module ● Mobile Version ● The System Must Have A Mobile Version Of The Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hub Subsystems Website Designed For Smartphones And Tablets. It Gives Students, Professors, Staff, And Stakeholders Easy Access To University Information And Services. ● The System Should Promote Accessibility, Convenience, And A Great User Experience By Allowing Users To Communicate With The University Community Anytime. ● The System Should Accommodate Each Module's Specialized Functionalities While Staying Mobile-friendly And Focusing On Users. ● The System Must Be Able To Receive Notifications. C. Report Requirements These Are The Suggested Reports That Ought To Be Produced By The System To Analyze The Information Systems Trends In Bulacan's Colleges. It Is Recommended That The Data Be Automatically Submitted Through An Api In Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hub To Give Basc Staff The Information They Need To Enhance The School Community. C.1 University Information System ● Admission Module ● List Of Applicants - The Overall List Of Potential Students With Their Personal Or Application Information. ● Registrar Module ● Academic Evaluation - Assessment Of A Student's Academic Performance, Conducted By The Institution's Instructors. ● Official List Of Enrollment - Document Provided By The Institution That Confirms The Students That Are Registered Or Enrolled For A Specific Academic Year. ● Diploma - Gives Thorough Details Regarding A Student's Academic Accomplishments And The Diploma's Presentation As Evidence Of Completion Of An Academic Program. ● Registration - A Document That Gives Information About A Student's Course Enrollment At The Institution For A Certain Term Or Semester. ● Shiftee - Document Of Proof For Students Who Are Changing Or Shifting Their Academic Programs Or Courses. ● Student Directory - Comprehensive And Manageable List Of Students Enrolled At The Institution. ● Subject Master List - A Thorough List Or Catalog Of Each Field Or Course That The Educational Institution Offers ● Summary Of Enrollment - Overview Of The Current Enrollment Status Of The Students At The Institution For A Specific Semester Or Academic Year. ● Enrollment Module ● Summary Of Enrolled Students - A Summary Of The Current Student Population, Including Enrollment Data And Demographics. ● Summary Of Unpaid School Fees - Gives A Summary Of The Unpaid Fees That Students Owe For The Current Semester Or Academic Term. ● Summary Of Tuition Fees Collected - Gives A Summary Of The Fees Collected/received From The Students For The Current Semester Or Academic Term. ● Clinic Record Management Module ● Health Management Report - A Document That Typically Focuses On The Health And Wellness Of Its Students And Covers Various Aspects Related To Healthcare Services Offered By The University. C.2 Learning Management System ● Professor Module ● Class Report - A Summary Of The Progress, Performance, And Involvement Of The Students In A Particular Course Or Class. ● Student Transcript Module: ● Subject Modules Report - Provides Comprehensive Insights And Summaries Related To The Modules Listed In A Specific Subject. ● Lesson Plan Report - Generates A Summary Lesson Plan That Is Defined By The Institution Or Organization. C.3 Human Resource Management System And Timekeeping System ● Audit Trail Report: ● Gives A Thorough Account Of All The Actions And Modifications Conducted Within The Hr System. Monitoring User Behavior, Protecting Data Integrity, And Upholding Adherence To Hr Rules And Regulations All Depend On This Report. C.4 Payroll Management System ● Payroll Management System ● Daily Time Record (dtr) - An In-depth Record Of Employees' Daily Attendance That Includes The Total Number Of Hours Worked, The Number Of Leaves Taken, And Other Essential Time-related Data. ● Payslip/s - A Detailed Breakdown Of An Employee's Earnings And Deductions For A Specific Pay Period. ● Payroll Report For A Specific Period - A Complete Summary Of Payroll Costs And Associated Information For A Specific Pay Period. C.5 Assets & Fleet Management System ● This Applies To Both Systems ● Assets And Fleets Reporting - A Document Containing Management Insights For Different Vehicles And Assets Used For Administrative And Academic Purposes. ● Depreciation Tracking - A Detailed Overview And Monitoring Of The Decrease In Value Of Such Assets Over Time Over A Specified Period. C.6 Document Management System ● Document Management System (dms) ● List Of On-hand Documents - Displays A List Of All Of The Documents That Are Available Or Accessible At The Moment Within The System. ● List Of Incoming Documents - Provides An Inventory Of Documents That Have Been Recently Received Or Uploaded Into The System. ● List Of Received Documents - Provides A List Of All The Documents The Institution Has Received In A Given Time Frame. ● List Of Finalized Or Kept Documents - Provides An Inventory Of All The Documents That Have Been Approved, Completed, And Archived In The System. ● List Of Archived Documents - Provides Comprehensive Details About The Documents That Have Been Stored In The System's Archive. ● Details Of Document Batch Tracked - Provides Full Details On The Batches Of Documents That The System Is Tracking. Documents Pertaining To Research Projects, Financial Transactions, Student Records, Admissions, And Other Aspects Of University Operations May Be Included In These Sections. ● Audit Logs Of Documents - Detailed Log Of Every Activity And Modification Performed To Any Document In The System. C.7 Trouble Ticketing System ● Reporting And Analytics ● The Solution Must Be Able To Provide Reports In Different Formats I.e., Pie Graph, Line Graph, Or Bar Graph. ● The Solution Must Be Able To Extract The Following Data Groupings: Open Tickets, Open With Critical Severity, In Progress, Overdue, Not Updated For 7 Days And Older Than 30 Days, And Tickets By State. C.8 Queueing / Appointment System ● The Solution Must Be Able To Generate Reports Which Show The Following: ● Queue List - Presents A Summary Of The System's Appointments And Queue Status At The Given Moment. ● Visitors List - Provides A Summary Of The Visitors' List And The Appointments They Have Made Using The Appointment/queuing System. ● Advertisements - Provides An Overview Of Advertisements And The Details That Are Displayed In The System. ● Queue Service - Presents An Overview Of The Queue Service Availability And Performance Within The Queueing/appointment System. ● Audit Trail - List Of Users' Activities On Who Approves, Disapproves, Cancels, And Reschedules Appointments. C.9 Executive Information System ● Reporting And Dashboard ● All-in-one Reporting, Dash Boarding, And Analysis. The Solution Should Support Multiple Use Cases Of Visualization Software Including Reporting, Interactive Analysis, And Business Intelligence. C.10 Campus Portal System ● Web Traffic Report ● The Web Traffic Report Provides Insights Into The Usage Patterns And Trends Within The Campus Portal, Offering Valuable Information About How Users Interact With The Platform. This Report Encompasses Various Metrics And Analytics That Help Administrators And Stakeholders Understand The Effectiveness Of The Portal And Identify Areas For Improvement. Key Components Of The Web Traffic Report Include: ■ Page Views: This Metric Quantifies The Total Number Of Times Each Page Within The Portal Has Been Viewed By Users Over A Specified Period. It Helps Gauge The Popularity And Relevance Of Different Sections Or Features Of The Portal. ● Unique Visitors: Unique Visitors Represent The Number Of Distinct Individuals Who Have Accessed The Portal Within A Given Timeframe. Tracking Unique Visitors Provides A Measure Of The Portal's Reach And User Engagement. ● Traffic Sources: Understanding Where The Traffic Originates From Can Provide Insights Into The Effectiveness Of Marketing Efforts Or The Impact Of External Events. Traffic Sources May Include Direct Visits, Referrals From Other Websites, Search Engines, Or Social Media Platforms. ● Bounce Rate: The Bounce Rate Indicates The Percentage Of Visitors Who Navigate Away From The Portal After Viewing Only One Page. A High Bounce Rate May Suggest Issues With Content Relevance, User Experience, Or Site Performance. ● User Demographics: Analyzing Demographic Data Such As Geographic Location, Device Type, And Browser Preferences Can Help Tailor The Portal's Content And Optimize Its Compatibility Across Different Platforms. ● Session Duration: This Metric Measures The Average Amount Of Time Users Spend On The Portal During Each Visit. Longer Session Durations Generally Indicate Higher User Engagement And Interest In The Provided Content. ● Popular Pages: Identifying The Most Visited Pages Or Sections Of The Portal Can Inform Content Prioritization And Resource Allocation Efforts. It Also Highlights Areas Of Interest Or Importance To The User Community. ● Audit Logs Report ● The Audit Logs Report Offers A Comprehensive Overview Of All Activities And Interactions Within The Campus Portal, Serving As A Vital Tool For Monitoring Compliance, Security, And Accountability. By Maintaining Detailed Records Of User Actions, System Events, And Administrative Changes, The Audit Logs Report Enables Administrators To Track User Behavior, Detect Anomalies, And Investigate Incidents Effectively. Key Features Of The Audit Logs Report Include: ■ User Activity Tracking: Every Action Performed By Users Within The Portal, Such As Login Attempts, File Uploads, Document Downloads, And Profile Modifications, Is Logged And Timestamped For Auditing Purposes. ■ Access Control Monitoring: The Report Monitors Changes To User Permissions, Role Assignments, And Access Privileges, Ensuring That Only Authorized Individuals Can View Or Modify Sensitive Information. ■ System Events Recording: Critical System Events, Including Software Updates, Database Modifications, Error Messages, And Security Alerts, Are Recorded To Facilitate Troubleshooting And Maintain System Integrity. ■ Compliance Verification: By Documenting Compliance-related Activities, Such As Data Access Requests, Consent Agreements, And Policy Acknowledgments, The Audit Logs Report Helps Organizations Demonstrate Adherence To Regulatory Requirements And Internal Policies. C.11 University Library System ● Reporting And Analytics Module ● The System Must Enable The Library To Gather, Analyze, And Present Data Related To Its Operations And Performance. ● The Solution Must Be Able To Generate Reports That Show The List Of Patrons. D. System Requirements • Sso Should Be Able To Manage People's Information And Authentication Of Security. • Hris Should Be Able To Manage The Employee Information • The System Should Be Developed Using The Coreui Framework. • The System Shall Support Connectivity And Access To Data Stored In Relational Ms– -sql Databases. • The System Must Support Interfaces To Common Packaged Applications Via The Standard Application Interface Provided. • The System Shall Support Paperless Reporting. • The System Shall Support Mobile (android & Ios) Devices. • The System Shall Support Web Desktop And Mobile Web Access. • A System With Superior Wide Area Network (wan) Performance, Highly Secured Features/functionalities, And Uses Web–enabled Workflow Systems Available To The Offices. E. Supply, Delivery, And Implementation E.1 University Information System Infrastructure 1. One (1) Service - Vulnerability And Pen-testing 2. One (1) Service - Database Modelling Design Services 3. One (1) Service - Server Installation And Configuration Services 4. One (1) Service - Application Installation 5. One (1) Service - User Workflow Integration (qa) 6. One (1) Service - Ssl And Dns Configuration 7. One (1) Service - Integration To Basc Rdbms Database 8. One (1) Service - Data Migration 9. One (1) Service - Project Management Services 10. One (1) Service - User Acceptance Testing (uat) 11. One (1) Service - User Training Services 12. One (1) Service - Scaling And Optimization 13. One (1) Service - Manpower Cost 14. One (1) Service - Mobilization Cost 15. Two (2) Years - Support E.2 Learning Management System Infrastructure 1. One (1) Service - Vulnerability And Pen-testing 2. One (1) Service - Database Modelling Design Services 3. One (1) Service - Installation And Configuration Services 4. One (1) Service - Application Installation 5. One (1) Service - User Workflow Integration 6. One (1) Service - Ssl And Dns Configuration 7. One (1) Service - Integration To Basc Rdbms Database 8. One (1) Service - Data Migration 9. One (1) Service - Project Management Services 10. One (1) Service - User Acceptance Testing (uat) 11. One (1) Service - User Training Services 12. One (1) Service - Scaling And Optimization 13. One (1) Service - Manpower Cost 14. One (1) Service - Mobilization Cost 15. Two (2) Years - Support E.3 Cashiering System Infrastructure 1. One (1) Service - Vulnerability And Pen-testing 2. One (1) Service - Database Modelling Design Services 3. One (1) Service - Installation And Configuration Services 4. One (1) Service - Application Installation 5. One (1) Service - User Workflow Integration 6. One (1) Service - Ssl And Dns Configuration 7. One (1) Service - Integration To Basc Rdbms Database 8. One (1) Service - Data Migration 9. One (1) Service - Project Management Services 10. One (1) Service - User Acceptance Testing (uat) 11. One (1) Service - User Training Services 12. One (1) Service - Scaling And Optimization 13. One (1) Service - Manpower Cost 14. One (1) Service - Mobilization Cost 15. Two (2) Years - Support E.4 Human Resource Information System Infrastructure 1. Twenty (20) Units - Biometric - Time & Attendance A. Must Support Up To 1,500 Fingerprints, Up To 100,000 Records, And Up To 2,000 Cards (optional). B. Must Support Multi-languages. C. Must Have Communication: Tcp/ip, Usb-host, Wi-fi (optional). D. Must Have High Verification Speed. E. Must Have Professional Firmware And Platform. 2. One (1) Unit - Desktop Computer A. Processor: Intel I5 Or Amd Ryzen5 Processor (or Higher) B. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) C. Operating System (os): Windows 11 Or Higher D. Memory: 16 Gb (or Higher) E. Storage: 500 Gb Ssd (or Higher) F. Display: 14” Display G. Graphic Card: Integrated Graphics H. Camera: 1080p Fhd Ir/rgb Hybrid I. Wireless: Wi-fi 6e Ax211 2x2, Bluetooth 5.1 Or Above J. Ethernet Port Or Usb K. Power Cord: At Least 45w L. Warranty: 1 Year Courier Or Carry-in M. Must Have 1*650va Ups 3. One (1) Service - Vulnerability And Pen-testing 4. One (1) Service - Database Modelling Design Services 5. One (1) Service - Installation And Configuration Services 6. One (1) Service - Application Installation 7. One (1) Service - User Workflow Integration 8. One (1) Service - Ssl And Dns Configuration 9. One (1) Service - Integration To Basc Rdbms Database 10. One (1) Service - Data Migration 11. One (1) Service - Project Management Services 12. One (1) Service - User Acceptance Testing (uat) 13. One (1) Service - User Training Services 14. One (1) Service - Scaling And Optimization 15. One (1) Service - Manpower Cost 16. One (1) Service - Mobilization Cost 17. Two (2) Years - Support 18. One (1) Year - Warranty E.5 Payroll Management System Infrastructure 1. One (1) Service - Vulnerability And Pen-testing 2. One (1) Service - Database Modelling Design Services 3. One (1) Service - Installation And Configuration Services 4. One (1) Service - Application Installation 5. One (1) Service - User Workflow Integration 6. One (1) Service - Ssl And Dns Configuration 7. One (1) Service - Integration To Basc Rdbms Database 8. One (1) Service - Data Migration 9. One (1) Service - Project Management Services 10. One (1) Service - User Acceptance Testing (uat) 11. One (1) Service - User Training Services 12. One (1) Service - Scaling And Optimization Of Payroll Management System 13. One (1) Service - Manpower Cost 14. One (1) Service - Mobilization Cost 15. Two (2) Years - Support E.6 Assets & Fleet Management System Infrastructure 1. One (1) Service - Vulnerability And Pen-testing 2. One (1) Service - Database Modelling Design Services 3. One (1) Service - Installation And Configuration Services 4. One (1) Service - Application Installation 5. One (1) Service - User Workflow Integration 6. One (1) Service - Ssl And Dns Configuration 7. One (1) Service - Integration To Basc Rdbms Database 8. One (1) Service - Data Migration 9. One (1) Service - Project Management Services 10. One (1) Service - User Acceptance Testing (uat) 11. One (1) Service - User Training Services 12. One (1) Service - Scaling And Optimization 13. One (1) Service - Manpower Cost 14. One (1) Service - Mobilization Cost 15. Two (2) Years - Support E.7 Document Management System Infrastructure 1. Ten (10) Units - Barcode Printer A. Should Be Capable Of Printing High-quality, Durable Barcodes On Various Label Materials. B. Should Offer Customizable Printing Options, Including Label Size, Orientation, And Font. C. Must Be Easy To Integrate With The Document Management System For Automated Barcode Generation And Printing. 2. One-hundred (100) Rolls - 2 X 1 Risen Label Sticker (2688 Stickers Per Roll) A. Should Be Durable And Resistant To Wear And Tear. B. Must Be Compatible With The Chosen Barcode Printer. 3. One-hundred (100) Rolls - 2 X 1 Ribbon For Risen Label Sticker (4 Rolls Sticker: 1 Ribbon) A. Should Produce Clear And Legible Barcode Prints. B. Must Be Compatible With The Chosen Barcode Printer And Label Stickers. C. Should Provide A Long Print Life And Minimize Ribbon Wastage. 4. Twenty (20) Units - Industrial Doc Imaging Machine A. Should Be Capable Of High-volume, High-speed Scanning Of Various Document Types (e.g., Paper, Plastic Cards). B. Must Offer Advanced Image Processing Features, Such As Automatic Document Feeding, Image Enhancement, And Ocr. C. Should Be Durable And Reliable, Suitable For Heavy-duty Use In Industrial Environments. D. Must Be Easy To Integrate With The Document Management System For Automated Image Capture And Indexing. 5. Three (3) Units -departamental Doc Imaging Machine A. Should Be Suitable For Lower-volume Scanning Needs In Departmental Settings. B. Must Offer Basic Image Processing Features, Such As Automatic Document Feeding And Image Enhancement. C. Should Be Compact And Easy To Use. D. Must Be Compatible With The Document Tracking System For Automated Image Capture And Indexing. 6. Twelve (12) Units -departamental Doc Imaging Machine Peripherals A. Should Include Necessary Accessories For Efficient Document Scanning, Such As Paper Trays, Feeder Units, And Cleaning Kits. B. Must Be Compatible With The Chosen Departmental Doc Imaging Machine. C. Should Be Easy To Install And Maintain. 7. Forty (40) Units -barcode Scanner A. Should Be Capable Of Accurately Scanning Various Barcode Types. B. Must Offer High-speed Scanning And Reliable Performance. C. Should Be Durable And Ergonomic, Suitable For Frequent Use. D. Must Be Easy To Integrate With The Document Management System For Automated Data Entry And Workflow Triggering. 8. One (1) Service - Vulnerability And Pen-testing 9. One (1) Service - Database Modelling Design Services 10. One (1) Service - Installation And Configuration Services 11. One (1) Service - Application Installation 12. One (1) Service - User Workflow Integration 13. One (1) Service - Ssl And Dns Configuration 14. One (1) Service - Integration To Basc Rdbms Database 15. One (1) Service - Data Migration 16. One (1) Service - Project Management Services 17. One (1) Service - User Acceptance Testing (uat) 18. One (1) Service - User Training Services 19. One (1) Service - Scaling And Optimization 20. One (1) Service - Manpower Cost 21. One (1) Service - Mobilization Cost 22. Two (2) Years - Support 23. One (1) Year - Warranty E.8 Trouble Ticketing System Infrastructure 1. One (1) Service - Vulnerability And Pen-testing 2. One (1) Service - Database Modelling Design Services 3. One (1) Service - Installation And Configuration Services 4. One (1) Service - Application Installation 5. One (1) Service - User Workflow Integration 6. One (1) Service - Ssl And Dns Configuration 7. One (1) Service - Integration To Basc Rdbms Database 8. One (1) Service - Data Migration 9. One (1) Service - Project Management Services 10. One (1) Service - User Acceptance Testing (uat) 11. One (1) Service - User Training Services 12. One (1) Service - Scaling And Optimization 13. One (1) Service - Manpower Cost 14. One (1) Service - Mobilization Cost 15. Two (2) Years - Support E.9 Queueing / Appointment System Infrastructure 1. Six (6) Units - Kiosk Stand With Touch Screen Monitor And Printer 2. Six (6) Units - Kiosk Audio Panel 3. Twelve (12) Units - Kiosk Interactive 65” Smart Tv 4. One Million (1m) Credits - Sms 5. One (1) Service - Vulnerability And Pen-testing 6. One (1) Service - Database Modelling Design Services 7. One (1) Service - Installation And Configuration Services 8. One (1) Service - Application Installation 9. One (1) Service - User Workflow Integration 10. One (1) Service - Ssl And Dns Configuration 11. One (1) Service - Integration To Basc Rdbms Database 12. One (1) Service - Data Migration 13. One (1) Service - Project Management Services 14. One (1) Service -user Acceptance Testing (uat) 15. One (1) Service - User Training Services 16. One (1) Service - Scaling And Optimization 17. One (1) Service - Manpower Cost 18. One (1) Service - Mobilization Cost 19. Two (2) Years - Support 20. One (1) Year - Warranty E.10 Executive Information System Infrastructure 1. One (1) Service - Vulnerability And Pen-testing 2. One (1) Service - Database Modelling Design Services 3. One (1) Service - Installation And Configuration Services 4. One (1) Service - Application Installation 5. One (1) Service - User Workflow Integration 6. One (1) Service - Ssl And Dns Configuration 7. One (1) Service - Integration To Basc Rdbms Database 8. One (1) Service - Data Migration 9. One (1) Service - Project Management Services 10. One (1) Service - User Acceptance Testing (uat) 11. One (1) Service - User Training Services 12. One (1) Service - Scaling And Optimization 13. One (1) Service - Manpower Cost 14. One (1) Service - Mobilization Cost 15. Two (2) Years - Support E.11 Campus Portal System Infrastructure 1. One (1) Service - Vulnerability And Pen-testing 2. One (1) Service - Database Modelling Design Services 3. One (1) Service -installation And Configuration Services 4. One (1) Service - Application Installation 5. One (1) Service - User Workflow Integration 6. One (1) Service - Ssl And Dns Configuration 7. One (1) Service - Integration To Basc Rdbms Database 8. One (1) Service - Data Migration 9. One (1) Service -project Management Services 10. One (1) Service - User Acceptance Testing (uat) 11. One (1) Service - User Training Services 12. One (1) Service - Scaling And Optimization 13. One (1) Service - Manpower Cost 14. One (1) Service - Mobilization Cost 15. Two (2) Years - Support E.12 University Library System Infrastructure 1. One (1) Unit - Kiosk (self Check-in & Self Check-out) With Monitor And Barcode Reader. 2. Fifty Thousand (50,000) Pcs - Rfid Tags For Books 3. Two (2) Units - Rfid Reader 4. One (1) Unit - Barcode Printer 5. Twenty Five (25) Rolls - Barcode Sticker 6. One (1) Unit - Barcode 3d Scanner 7. One (1) Service - Vulnerability And Pen-testing 8. One (1) Service - Database Modelling Design Services 9. One (1) Service - Installation And Configuration Services 10. One (1) Service - Application Installation 11. One (1) Service - User Workflow Integration 12. One (1) Service - Ssl And Dns Configuration 13. One (1) Service - Integration To Basc Rdbms Database 14. One (1) Service - Data Migration 15. One (1) Service - Project Management Services 16. One (1) Service - User Acceptance Testing (uat) 17. One (1) Service - User Training Services 18. One (1) Service - Scaling And Optimization 19. One (1) Service - Manpower Cost 20. One (1) Service - Mobilization Cost 21. Two (2) Years - Support 22. One (1) Year - Warranty E.13 Internet Connectivity 1. Eighteen (18) Months - Speed Requirement: 5 Gbps Bandwidth A. Connection Should Be Of Cable Type, Preferably Fiber-optic; Wireless Solutions May Be Considered. B. No Limitations On Traffic/ports; Bandwidth Capacity Should Be Ensured Through A Direct Ip Connection. C. A Subnet Of At Least 14 Static Publicly Routable Ip Addresses Is Required. D. Service Reliability Must Be Ensured. Overall Uptime Should Not Be Less Than 99%. E. All Necessary Hardware, Cabling, And Software (if Required For Internet Service) Should Be Provided And Set Up By The Provider. F. Support Managed Vpn Services. G. Isp Must Be Able To Manage The Customer Premises Equipment (cpe) To Be Installed In The Bulacan Agricultural State College. H. Traffic Management, Network Monitoring, And Access To Raw Log Files. I. Fiber Optic Connectivity From The Isp To The Internet Backbone. 2. One (1) Unit - Multiple Wan Router 3. One (1) Unit - Core Routing Switch 4. Four (4) Units - Distribution Switch 5. Ten (10) Units - Qsfp+ Module Xq+cm0000-xs+ 6. One (1) Service - Project Management Services Network Configuration Services 7. One (1) Service - Training And Knowledge Transfer 8. One (1) Service - Scaling And Optimization (testing And Analysis By Fluke Systems) 9. One (1) Service - Manpower Cost 10. One (1) Service - Mobilization Cost 11. Two (2) Years - Support 12. One (1) Year - Defect Liability E.14 Campus Network System 1. Ninety-four (94) Units - Indoor Wireless Access Points A. The Proposed Equipment Shall Support 802.11a/b/g/n/ac/ac Wave2/ax Protocol B. Triple-band Design, Support 2*2 Mimo, 2.4g ≥570mbps, 5g ≥3200 Mbps, The Maximum Speed ≥3.8gbps. C. Support Built-in Omnidirectional Antenna D. 1 Gigabit Ethernet Port E. 1*micro-usb Port F. Support 802.3at Standard Poe Power Supply And Power Adaptor G. Ap Full Load Working Power Consumption ≤ 17.5w H. Ap Transmit Power ≤20dbm (smaller Than 100mw), And Power Can Be Adjusted (adjustment Granularity Is 1dbm, Adjustment Range Is 3dbm~27dbm) I. Protection Degree≥41 J. Operating Temperature: -10~50℃, Humidity:5%~95% Non-condensing K. Maximum Concurrent Client ≤ 256 L. Support For Ssid-based Access User Limit M. Support Virtual Ap Technology, The Number Of Ssid Per Rf ≥16, Per Ap ≥32; N. Support Hiding Of Ssid O. Support Multiple Vlans Per Ssid P. Support Standalone Mode And Controller-based Mode, The Controller Must Be On-premise. Q. Ap Supports Tunnel Mode And Bridge Mode. Each Ssid Can Choose Its Own Working Mode. R. Support Ap Zero Configuration, Support Layer 2 And Layer 3 Discovery, Dhcp Option43, Dns Domain Name, And Other Network Access Controller Automatic Discovery Mechanisms S. Supports Ap Deployment Across Layer 3 Network, Wan, And Nat, And Supports Management Tunnel Encryption With Network Access Controller. T. Support The Service Sense Via Ai Rf, Including Connection And Delay For Network Access, Dhcp, Gateway, Dns, Internet And Other Server Address U. Support The Environment Sense Via Ai Rf, Including Channel Utilization, Co-channel Ap, Interference Ssid V. Supports 802.1x, Portal, Mac Address Authentication, Ca Certificate Authentication, Qr Code Approval Authentication, Sms Authentication, App Authentication, Guest Account, Facebook, 802.1x Wep, Wpa, Wpa2, And Other Authentication Methods; W. Support 802.11i, Aes, Tkip, And Other Encryption Methods X. Support Wips/anti-phishing Wifi Via Independent Rf (non-user Connected Radio Frequency) To Conduct Real-time Detection, Alarm, And Countermeasures For Illegal Access Points. Y. Support East-west Traffic Security, By Detecting Abnormal Behavior To Block Viruses Within The Intranet Z. Support Ap Vpn, An Encrypted Communication Tunnel Can Be Established Across The Internet And Remote Wireless Controllers For Encrypted Remote Access, The Ap Vpn Should Also Support Bidirectional Access From Site To Site. Aa. Support Intelligent Load Balancing Based On The Number Of Users, Signal Strength, And Channel Utilization, And Automatically Balance The Access Pressure Between Aps Bb. Support Rf Guiding Function To Guide Wireless Terminals To Preferentially Access 5g Frequency Bands With Low Interference Cc. Supports Fit Ap Switching To Gateway Mode (non-fat Ap Mode), Supports Pppoe Dial-up, Static Ip, And Dhcp. Dd. Support Dhcp Server And Dns Proxy Ee. Support The Wireless Controller Escape Function, When The Wireless Controller Is Down, The Ap Still Can Guarantee The Normal Online Access Of Online Users, And Ensure That New Users Can Also Connect To The Wireless Network Through Authentication; 2. One (1) Lot - Network Access Controller A. The Proposed Controller Shall Support At Least 5 Service Ports, 1 Rj45 Console Port, 1 Rj45 Manage Port, 2 Usb Ports, And 2 Expansion Slots. B. The Proposed Controller Shall Support Up To 1200 Access Points. C. The Proposed Controller Shall Support At Least 8 Built-in Captive Portal Templates. D. The Proposed Controller Shall Support Access Controller And Qos-based Applications And Urls. The Application Fingerprints In The Controller Database Should Be Larger Than 6400 At Least One Year Application And A Url Update License Should Be Included E. The Proposed Controller Shall Support A Questionnaire Survey And The Survey Result Can Be Shown In The Controller F. Web Ui To Show Survey Results In The Controller G. The Proposed Controller Can Configure The Time/data Quota Policy For Wi-fi Users. H. The Proposed Controller Shall Support The Topology Of The Switch. I. The Proposed Controller Shall Support The Big Data Analysis For The Guests, And Staff. The Content Should Include The Favorite Application, Online Duration, Time Starts, And Checkout. J. The Proposed Controller Shall Be Capable Of Identifying Terminal Types And Assigning The Different Policy-based Terminal Types. K. The Proposed Controller Shall Support The Graphical Dhcp Address Pool From The Controller And Switch And Can View The Following Information In Each Address Pool: I. Conflict Ip Address Ii. Terminal Devices Fail To Obtain An Ip Address Iii. Address Pool Utilization Iv. Ip Allocation Times Distribution L. The Proposed Controller Can Be Used As The Gateway, Support Ppoe, Nat, Policy-based Routing, Dhcp Server, Dhcp Replay, Provide Authentication And Access Controller For Both Wired And Wireless Users, M. The Proposed Software Controller Shall Support The Following: I. 802.1x Authentication Ii. Portal Authentication Iii. Mac Address-based Authentication N. Also Need To Support The Integration With Radius, Ldap, Ad, And Other Databases O. The Proposed Controller Shall Support Viewing Of The Following Status Of Ap. I. Power Supply Load Ii. System Resources (memory, Cpu) Iii. Chip Resources (mac Table, Arp Table, Acl Table, Route Table Utilization) Iv. Packet Drop Ratio V. Jumbo/normal Frame Vi. Traffic Load Vii. Packet Analysis (broadcast, Multicast, And Unicast Packets) Viii. Network Protocol Packet Receiving Rate Analysis (dhcp, Icmp, Arp, And Tcp Packet Rate) P. The Proposed Controller Shall Support A Security Log To View Switch Attack Events, Including Event Types, Attacker Mac Address, And Attack Device Types. Q. The Proposed Controller Shall Support The Binding Of Terminals To Ip Based On Switch Port Groups, And The Binding Of Terminals And Ports Based On Switch Port Groups. R. The Proposed Controller Manufacturer Shall Have A Cmmi5 Certificate To Ensure The Maturity Of The Product Software. S. The Proposed Brand Must Be Iso 9001 Certified 3. Forty-seven (47) Units - Access Poe Switch A. The Proposed Equipment Shall Have At Least I. 24 Gigabit Ethernet Poe Ports Ii. 4* Sfp+ Ports B. The Proposed Equipment Shall Support Ieee 802.3af/at Power Supply Standard, Single Port Maximum Output Poe Power 30w, The Whole Machine Maximum Output Poe Power 370w C. The Proposed Equipment Shall Have A Console Port D. The Proposed Equipment Shall Support Standalone Web Gui Management And Controller-based Management. E. The Proposed Equipment Shall Have A Switching Capacity Of At Least 336gbps F. The Proposed Equipment Shall Have Packet Forwarding Of At Least 108mpps G. The Proposed Equipment Shall Support Acl Policies Based On Single-port And Aggregation Of Interfaces. H. The Proposed Equipment Shall Support Acl Policies Based On Source Ip Address And Mac Address. I. The Proposed Equipment Shall Support Acl Policies Based On Protocols (ospf, Udp, Arp) J. The Proposed Equipment Shall Support Time-based Acl Policies K. The Proposed Equipment Shall Support 802.1p, Ip And Service Level, Dscp Priority Settings L. The Proposed Equipment Shall Support Traffic Shaping; And Packet Forwarding Rate Setting Based On The Outbound And Inbound Directions Of Switch Ports. M. The Proposed Equipment Shall Support Cos And Dscp Priority Mapping Based On Switch Groups N. The Proposed Equipment Shall Support Congestion Management That Supports Multiple Scheduling Modes To Implement Traffic Based On Packet Or Port Priority. O. The Proposed Equipment Shall Support Port Mirroring And Redirection. P. The Proposed Equipment Shall Support Dhcp Snooping, Dhcp Server Q. The Proposed Equipment Shall Support The Spanning Tree Protocol (stp, Rstp, Mstp) R. The Proposed Equipment Shall Support Igmp V1/v2/v3 Snooping S. The Proposed Equipment Shall Support 4,000 Vlan T. The Proposed Equipment Shall Support 16,000 Mac Address U. The Proposed Equipment Shall Support Mac Address Dynamic Learning V. The Proposed Equipment Shall Support Mac Address Filtering W. The Proposed Equipment Shall Support Mac Address Learning Limit X. The Proposed Equipment Shall Support Link Aggregation Y. The Proposed Equipment Shall Support M-lag Technology, Cross-device Link Aggregation Z. The Proposed Equipment Shall Have Layer 3 Routing Protocols Such As Static Routing, Rip, Ospf, Vrrp Aa. The Proposed Equipment Shall Support East-west Traffic Security With Policies Based On Area Or User Role, And Prevent The Virus Spread Within The Intranet Bb. The Proposed Equipment Shall Support Topology In The Controller, Configuration And Status Checking Can Be Done By Clicking The Topology. Cc. The Proposed Equipment Shall Support The Replacement By One Click On The Controller Platform To Replace The Defective Device Dd. The Proposed Equipment Manufacturer Shall Have A Cmmi5 Certificate To Ensure The Maturity Of The Product Software Ee. The Proposed Brand Must Be Iso 9001 Certified 4. One (1) Lot - Installation Consumables 5. One (1) Service - Network Design, Consultation (signed By Pece) And Permits 6. One (1) Service - Project Management Services 7. One (1) Service - Switch & Access Point Installation 8. One (1) Service -network Configuration Services 9. One (1) Service - User's Training And Knowledge Transfer 10. One (1) Service - Scaling And Optimization (testing And Analysis By Fluke Systems) 11. One (1) Service - Manpower Cost 12. One (1) Service - Mobilization Cost 13. One (1) Service - Forwarding Cost 14. One (1) Year - Campus Network System Defect Liability (base Bundle Warranty-support) A. 1-year Warranty For All Active Devices B. 1-year Subscription To Licenses C. 1-year Workmanship Warranty And After-sales Support E.15 Fiber Optics Works 1. Fiber Optics Passive Components A. Thirteen Thousand (13,000) Meters - Fiber Optic Cable Single Mode I. 8-core Single-mode 8 Ii. Fiber Type=g.652.d And G.657.a1, Teraspeed, Os2 Iii. Armored-type Corrugated Steel Iv. Stranded Loose-tube Cable-type V. Gel-free Sub-unit Type B. Forty-seven (47) Units - Fms Panel I. 1u Standard Size 19” Ii. Includes 6 X Lc Sm Adaptors (12f) Iii. Includes 12 X Sm Lc Pigtails Iv. Includes 12 X Splice Protectors V. With Splice Tray And Cable Glands (12 Port Loaded) C. One (1) Unit - Epx 4u Sliding Panel Splicing Cassette I. Symmetrical Body Style Ii. Sliding Shelf Iii. Splicing Type = Heat Shrink, Single Fiber Fusion Iv. Dimension: 44.45h X 482.6w X 320d Mm V. Powder Coated Finish D. Sixteen (16) Units - G2 Splice Cassette 24lc/upc With Internal Shutters Os2 With Pigtails I. Lc/upc Interface Ii. Method A Polarity Iii. Shuttered Iv. Maximum Insertion Loss = 0.25db V. Minimum Return Loss = 50db E. One Hundred Eighty-eight (188) Pcs - Fiber Patch Cords I. Lc-lc Patch Cord Ii. 1.6mm Duplex Iii. Riser Single Mode Os2, 0.9m F. Forty-seven (47) Units - Data Cabinet 15u I. Wall-mounted Type Ii. 600 X 600mm X 15u Dimension Iii. Glass Door With Lock With 8-gang Pdu G. One (1) Lot - Handhole Fabrication And Heat Shrinkable Seal Fiber Optic Splice Dome Closure I. With 24-core Pigtail Splicing Plate Termination H. One (1) Lot - Earth Ground Material And Accessories 2. Fiber Optics Active Components A. Two (2) Units - Network Core Switches I. 24-ports 10ge Layer 3 Managed Core And Aggregation Switch Ii. With 4 X 25g Ports Backward Compatible With 10g Iii. With 40g Uplink Capability Iv. With 150w Ac Power Module V. 19” Rack-mountable Vi. Steel Case B. Forty-seven (47) Units - Network Managed Switch I. 24-ports Layer 2 Managed Switch Ii. With 4 X 10g Uplink Ports Iii. 19” Rack-mountable Iv. Steel Case C. Four (4) Units - 40g Transceiver Modules I. 40g Lr Single-mode Fiber Module Ii. Qspf+ Transceiver Iii. Lc (1310nm) D. Ninety-four (94) Units - 10g Transceiver Modules I. 10g Lr Single-mode Fiber Module Ii. Qspf+ Transceiver Iii. Lc (1310nm) 3. One (1) Service - Roughing Ins Cost (piping Of Foc Per Building, Pvc/hdpe Pipes, Pullbox 10" X 10" X 6", Metal Clamps, Tox & Screws, Gi Wire) 4. One (1) Service - Labor Cost: Horizontal Direct Drilling (hdd) Wire Pulling, Roughing Ins For Expose Foc Going To Idf And/mdf 5. One (1) Service - Termination/splicing Of Pigtail Connectors/otdr Testing 6. One (1) Service - Electronic Permit Layout And Design (as-built Plan) 7. One (1) Service - Network Design And Consultation (signed By Pece) 8. One (1) Service - Project Management Services 9. One (1) Service - Switch Installation 10. One (1) Service - Network Configuration Services 11. One (1) Service - Training And Knowledge Transfer 12. One (1) Service - Cable Testing And Analysis By Fluke Systems 13. One (1) Service - Scaling And Optimization Of Network Security 14. One (1) Service - Manpower Cost 15. One (1) Service - Mobilization Cost 16. One (1) Service - Forwarding Cost 17. One (1) Year - Defect Liability 18. One (1) Year - Fiber Optic Passive Components Support Warranty A. 1-year Warranty For All Active Devices B. 1-year Subscription To Licenses C. 1-year Workmanship Warranty And After-sales Support E.16 Structured Cabling Works 1. Structured Cabling Passive Components A. Sixty-seven (67) Units – 24-ports 1u Keystone-type Patch Panel With Io Assembly I. 24-ports 1u Keystone Blank Panel Ii. 24-pcs Cat6+ Modular Jack, Rj45 Keyconnect Style B. One Thousand Four Hundred Thirty-three (1,433) Pcs – Cat6+ Modular Jack I. Cat6+ Modular Jack, Rj45 Keyconnect Style Ii. T568 A/b Wiring Scheme C. One Thousand Four Hundred Thirty-three (1,433) Pcs – 1-meter Cat6 Stranded Patch Cord I. 1-meter Cat6 Stranded Patch Cord Ii. T568b- Standard Machine-made Termination D. One Thousand Four Hundred Thirty-three (1,433) Pcs – 2 Meters Cat6 Stranded Patch Cord I. 2-meter Branded Cat6 Stranded Patch Cord Ii. T568b- Standard Machine-made Termination E. Sixty-seven (67) Units – Cable Organizer 1u I. 24 Slots Plastic With Cover F. Three Hundred Seventy-five (375) Rolls– Utp Cat6 Pure Copper I. Solid Bare-copper 24awg 4-pairs Ii. Pe-polyethylene Insulation Material Iii. 0.97 Mm Insulation Diameter Iv. Outer Jacket = Pvc Polyvinyl Chloride V. Operating Temperature = -20°c To +75°c Vi. Bending Radius = 23.2 Mm (0.913 In) G. Sixty-seven (67) Units – 15u Data Cabinet 600 X 600mm I. Wall-mounted Type Ii. 600 X 600mm Iii. Glass Door With Lock Iv. With 8-gang Pdu H. Sixty-seven (67) Sets – Fabricated Data Cabinet Bracket I. Five Hundred Fifteen (515) Pcs – Simplex Faceplate I. Keyconnect Faceplates, 1-port Ii. Plastic-made J. One Hundred Thirty-three (130) Pcs – Duplex Faceplate I. Keyconnect Faceplates, 2-ports Ii. Plastic-made K. Six Hundred Forty-five (645) Pcs – Faceplate Box I. Standard, Rectangular 2. Structured Cabling Active Components Technical Specification A. Seventy-two (72) Units – 24-ports L2+ Gigabit Switch + 4-sfp Ports Rack-mountable Ii. 24 X Gigabit Rj45 Iii. 4 X 10g Sfp+ Ports Iv. 19” Standard Size Rack-mountable B. Eighty-one (81) Units – 24-ports L2+ High-poe Switch Gigabit, With 4-sfp Module Rack-mountable I. 24 X Gigabit Poe Ports Ii. 4 X Sfp+ Slots Iii. 19” Standards Size Rack-mountable Iv. Poe Budget: At Least 370w C. Six (6) Units – 16-ports Aggregation Switch With 16-ports 10ge Ports I. 16 X 10g Sfp+ Slots Ii. 1u Rack Mountable 19” Iii. 802.3at/af D. Three Hundred Six (306) Units – Sfp+ Module, Single Mode Lc Connector I. 1310nm Single Mode Ii. Lc Duplex Connector Iii. Up To 10km Distance E. Three Hundred Six (306) Pcs – Lc Fiber Patch Cord I. Lc-lc Patch Cord Ii. 1.6mm Duplex Iii. Riser Single Mode Os2 0.9m F. Sixty-seven (67) Units – 1kva Ups, Tower Type I. 1000va/600w Ratings Ii. 1 X 12v/9ah Battery Iii. 4 X Universal Socket Iv. Not More Than 5.3kg G. One (1) Unit – 5kva Ups 4u, Online I. 5000va/5000w Ii. Dimension: Not Bigger Than 420 X 630 X 217mm Iii. Operating Voltage = 176 To 288 Vac Iv. Maximum Allowable Voltage = 288 Vac V. Input Frequency Without Battery Operation = 40 To 70hz Vi. Factory Default Voltage = 230 Vac Vii. Waveform = Pure Sinewave Viii. Backup Time At Full Load = 7 Ix. Backup Time At Half Load = 18.5 X. Audible Noise <55dba H. Sixty-seven (67) Units– Pdu With Reset And Switch, Metal Case I. 8-gang Metal With Reset Button Ii. Standard 19’’ Rack Mountable 3. Structured Cabling Roughing-ins A. One (1) Lot – Conduiting/piping Materials B. One (1) Lot – Cable Tray, Cable Ladder And Support Assembly (noc) C. One (1) Lot – Cable Tray Support & Hangers (distribution Per Building) D. One (1) Lot – Restoration Materials E. One (1) Lot – Cable Distribution Materials F. One (1) Lot – Grounding Materials, Installation And Consumables G. One (1) Lot – External Cabling Materials 4. One (1) Service - Network Design And Consultation (signed By Pece) 5. One (1) Service - Project Management Services 6. One (1) Service- Switch Installation 7. One (1) Service - Network Configuration Services 8. One (1) Service - Training And Knowledge Transfer 9. One (1) Service - External Cabling 10. One (1) Service - Scaling And Optimization (cable Testing And Analysis By Fluke Systems) 11. One (1) Service - Manpower Cost 12. One (1) Service - Mobilization Cost 13. One (1) Service - Forwarding Cost 14. One (1) Year - Service -structured Cabling Works Defect Liability 15. One (1) Year - Structured Cabling Passive Components Support Warranty A. 1-year Warranty For All Active Devices B. 1-year Workmanship Warranty And After-sales Support E.17 It Security Operations Center & Network Operations Center 1. One (1) Lot – Indoor Video Wall A. One (1) Lot – Led Panel I. Must Have 4.2x2.025m P0.9375 Indoor Led Screen Ii. Led Lamp Parameter: Color Configuration: Rgb 3in1, Color: Red, Green, Blue, Luminance: 990-1210 Mcd, 1980-2420 Mcd, 495-605 Mcd, Viewing Angle: 160º/160º, Wavelength: 625-630 Nm, 520-525 Nm, 465-470 Nm Iii. Must Have Led Module Parameter: Pixel Pitch(mm) 0.9375, Iv. Pixel Configuration Cob, Module Size(mm) W 300 H 168.75, Module Resolution(dots) W 320 H 180, Drive Ic Icn1069 V. Must Have Led Cabinet Parameter: Cabinet Size (mm) W 600 H 337.5, Cabinet Resolution (dots) W 640 H 360, Cabinet Pixels (dots) 230400, Cabinet Material Die Casting Aluminum, Cabinet Weight (kg) 4.8 Vi. Must Have Led Screen Parameter: Screen Size(m)w 4.2 W 2.025 H, Screen Resolution(dots)w 4480 W 2160 H, Cabinet Quantity(pc)w 7 W 6 H, Pixel Density(pixel/m2) 1137778, Brightness(cd/m2) 600, Brightness Adjusted 256 Grade By Software Or By Auto-optic Induced, Driving Method 1/46 Scan Display Color 439, 804, 651, 110, Viewing Distance (m) ≥0.9375m, View Angle Horizontal 160°; Vertical 160° Color Contrast Ratio 5000:1, Gray Grade 16bit, Refresh Frequency (hz) 3840, Protective Grade Ip43, Working Temperature(ºc) -30~+70, Stored Temperature (ºc) -40~+80, Operation Humidity(rh) 0-95%, Lifetime 100,000 Hrs Maintenance Front Side Working Voltage Ac110 / Ac220v±10% 47~63hz, Power Consumption Max: 800w/㎡ ; Ave:310w/㎡" B. One (1) Unit – Controller I. Must Have Three Kinds Of Led 4k Sending Cards: (1) − H_20xrj45 Sending Card Loads Up To 13,000,000 Pixels, (2) − H_16xrj45+2xfiber Sending Card Loads Up To 10,400,000 Pixels And Provides Two Opt Ports That Copy The Outputs On Ethernet Ports, (3) − H_4xfiber Sending Card Loads Up To 20,800,000 Pixels And Supports Three Working Modes, Including Independent, Copy And Backup. The Three Cards Mentioned Above Cannot Be Used Together To Load The Same Screen. Ii. Must Have Multi-capacity Configuration On A Single Card Slot: − 4x 2k×1k@60hz, − 2x 4k×1k@60hz, − 1x 4k×2k@60hz Iii. Must Have A Simple Screen Configuration Using A Single Card And Connector Iv. Must Have Online Status Monitoring Of All Input And Output Cards V. Must Have Hot-swappable Input And Output Cards Vi. Must Have An H_2xrj45 Ip Input Card That Supports Up To 512 Ip Camera Inputs And Input Mosaic. Vii. Must Have Auto Decryption Of Hdcp-encrypted Sources Viii. Must Have Decimal Frame Rates Supported Ix. Must Have Hdr10 And Hlg Processing X. Each Screen Can Have Its Output Resolution. Xi. Must-have Output Mosaic: Adopts The Frame Synchronization Technology, Which Ensures All The Output Connectors Output The Image Synchronously, And The Image Is Complete And Played Smoothly, Without Any Stuck, Frame Loss, Tearing, Or Piercing. Xii. Must Support Irregular Screen Configuration: Supports Irregular Rectangle Mosaic Without Any Limitations. Xiii. Must Have Input Source Grouping Management Xiv. Must Have Eye-saver Mode: Display The Image In A Warmer But Less Bright Way To Relieve Eye Strain. Xv. Lcd Bezel Compensation Xvi. Must Have Multi-layer Display: A Single Card Supports 16x 2k Layers, 8x Dl, Layers Or 4x 4k Layers. All Layers Support Cross-connector Output And The Layer Quantity Is Not Reduced For Cross-connector Output. Xvii. Must Have High-definition Scrolling Text, Customize The Scrolling Text Content, Such As Slogans Or Notification Messages, And Set The Text Style, Scrolling Direction, And Speed. Xviii. Must Support Up To 2,000 Presets: Fade Effect And Seamless Switching Supported, Less Than 60ms Preset Switching Duration Xix. Must Have Scheduled Playback Of Preset Playlist, Set Whether To Add The Presets To Playlist, Which Is Ideal For Monitoring, Exhibitions, Presentations, And Other Applications. Xx. Must Have Osd Settings On A Single Screen And Adjustable, Osd Transparency Xxi. Must Have Bkg Settings, Bkg Images Do Not Occupy The Layer Resources. The Max Width And Height Of A Bkg Image Is Up To 15k And 8k Respectively. Xxii. Must Have Channel Logo Management: Set A Text Or Image Logo For Identifying The Input Source. Xxiii. Must Have Input Source Cropping And Renaming After Cropping, Crop Any Input Source Image And Form A New Input Source After Cropping. Xxiv. Must Have Hdr And 10-bit Video Processing, Allowing For A More Exquisite And Clear Image. Xxv. Must Have Color Adjustment: Output Connector Color And Screen Color Adjustable, Including Brightness, Contrast, Saturation, Hue, And Gamma. Xxvi. Must Have Xr Scenario Control Xxvii. Must Have Low Latency: Reduce The Latency From The Input Source To The Receiving Card To As Low As 1 Frame. Xxviii. Must Have Web Control: Real-time Response And 1000m/100m Self-adaptive Network Control, Allowing For Multi-user Collaboration. Xxix. Must Have Monitoring Of Inputs And Outputs On A Web Page Xxx. Must Support Firmware Updates On Web Page Xxxi. Must Have Ark Visualized Management And Control Platform App Control On Pad Device. Xxxii. Must Have Self-test For Fault Detection Xxxiii. Must Have Auto-monitoring And Alarms: Supports Hardware Monitoring, Such As Fan Rotation Speed, Module Temperature And Voltage, And Running Status, And Sends Fault Alarms If Necessary. Xxxiv. Must Support An Optional Power Supply For Higher System Reliability. Xxxv. Must Have Backup Design − Backup Between Devices − Backup Between Led 4k Sending Cards. C. Accessories I. One (1) Unit - Vacuum Suction Ii. One (1) Unit - Structure/bracket 4.2x2.025m Iii. Nine (9) Units - Hdmi Cable (4k) 10 Meters D. Six (6) Units - 1500va/900w Line Interactive Ups E. Three (3) Units – Desktop Computers I. Processor: Intel I5 Or Amd Ryzen5 Processor (or Higher) Ii. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) Iii. Operating System (os): Windows 11 Or Higher Iv. Memory: 16 Gb (or Higher) V. Storage: 500 Gb Ssd (or Higher) Vi. Display: 14” Display Vii. Graphic Card: Integrated Graphics Viii. Camera: 1080p Fhd Ir/rgb Hybrid Ix. Wireless: Wi-fi 6e Ax211 2x2, Bluetooth 5.1 Or Above X. Ethernet Port Or Usb Xi. Power Cord: At Least 45w Xii. Warranty: 1 Year Courier Or Carry-in 2. Desktop Computers W/ Extended Monitor A. Six (6) Units – Desktop Computer I. Processor: Intel I7 Or Amd Ryzen7 Processor (or Higher) Ii. Memory: 16 Gb Ddr4 Or Higher Iii. Form Factor: Tower Iv. Storage: At Least 500 Gb Ssd (or Higher) V. Graphics Processing Unit (gpu): 4gb Vram, Gddr5 (or Higher) Vi. Display: At Least 23.8” Hd Led Display (or Higher) Vii. Motherboard: B760-g Wifi D5 Micro-atx Motherboard Viii. Power Supply: Modular Power Supply 850w 80+ Gold Argb Modular Psu Ix. Peripherals: Power Cords, Keyboard & Optical Mouse X. Chassis: Usb Ports, Audio Port, Mic Port, Power Switch, Reset Switch Xi. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) Xii. Operating System (os): Windows 11 Pro Or Higher Xiii. Warranty: 1 Year Courier Or Carry-in B. Six (6) Pcs For 6 Units Of Desktop – Extended Monitor I. Display: At Least 23.8” Hd Led Display (or Higher) C. Six (6) Units – Ups For Command Center I. Must Have Capacity 650va 3. Communication Equipment A. Six (6) Units – Desktop Computer Headphone I. Audio Specifications Must Have, Frequency Response: 20 Hz To 20,000 Hz (standard Range For Human Hearing), Impedance: 32 Ohms (standard For Most Headsets; Higher Impedance May Be Better For High-end Audio), Sensitivity: 90-120 Db (decibels) At 1 Mw For Sound Level, Driver Size: 30-50 Mm (larger Drivers Often Provide A Better Bass Response), Sound Output: Stereo Or 7.1 Surround Sound (for Gaming And Multimedia), Total Harmonic Distortion (thd): Less Than 1% (minimizes Audio Distortion), Noise-canceling: Active (anc) Or Passive, Ii. Microphone Specifications Must Have, Type: Omnidirectional Or Unidirectional, Frequency Response: 100 Hz To 10,000 Hz, Sensitivity: -38 Db ± 3 Db, Noise Cancellation: Active Or Passive Noise-canceling Microphone, Mute Function: Usually Included For Easy On/off Control, Iii. Connectivity Wired: 3.5 Mm Audio Jack, Usb (type-a Or Type-c) Iv. Controls Volume Control: On-ear Cup Or Inline Volume Adjustment, Playback Control: Some Models Allow Pause/play/skip For Media. B. Six (6) Units – Ip Phone Handset Note: Covered In Ip-pa System And Ip-pbx System I. Must Have The Following Physical Specifications: 2.3-inch 128x48 Pixel Dot-matrix Display, Graphical Lcd With Backlight, Keypad: 33 Keys, Including: 4soft-keys, 9 Function Keys (hold / Transfer / Voice Message / Conference / Phonebook, Mwi / Headset / Redial / Hands-free) 4 Navigation Keys, 12 Standard Phone Digits Keys, 3 Volume Control Keys (up/down/mute (microphone), Desktop Stand X1 Status Indicator Light X1 (red), Rj9/rj11 Port X2: Handset X1, Headset X1, Rj45 Port X2: Network X1, Pcx1 (bridged To Network), Security Slot X1, Dc Power Input: 5v/0.6a, Power Consumption (adapter): 0.8~1.29w, Power Consumption (poe): 1.25~1.86w, Device Dimensions: Desktop Stand (45°): 169x201.1x177.4 Mm, Desktop Stand (50°): 169x191.9x185.8 Mm, Wall Mountable: 169x120.1x213.7 Mm Ii. Must Have 6-way Audio Conference Iii. Must Have At Least 600 Call Logs Iv. Must Have At Least 1000 Local Phonebook V. Must Have At Least 1000 Remote Phonebook Vi. Must Have G.722, Opus Wideband Codec Vii. Must Have G.711a/u,g.726,g.723.1, G.729a/b, Ilbc Narrowband Codec Viii. Must Have 2 X 10/100/1000 Mbps Network Rate Ix. Must Have Power Supply Poe X. Must Support Ehs Wireless Headset Xi. Must Have Desktop Stand Xii. Must Support Plantronics Wireless Headset (through Plantronics Apd-80 Ehscable) Xiii. Must Support Recording (through Server) Xiv. Must-have Physical: 10/100/1000 Mbps Ethernet, Dual Bridged Port For Pc Bypass Xv. Must Support Ip Configuration: Static Ip / Dhcp / Pppoe Xvi. Must Support The Following Protocols: Sip 2.0 Over Udp/tcp/tls, Rtp/rtcp/srtp, Stun, Dhcp, Ipv6, Lldp, Pppoe, 802.1x, L2tp, Openvpn, Sntp, Ftp/tftp, Http/https, Tr-069, Aes 128 & Aes 256 Xvii. Must-have Generic Ip Phone Features: 2siplines, Hdvoice, Poeenabled, Dot-matrix Display Screen, Handset/hands-free /headset Mode, Desktopstand/ Wall Mountable (optional), Optional External Power Supply Xviii. Must Have The Following Call Functions: Callout/ Answer/ Reject, Mute/unmute(microphone), Callhold / Resume, Callwaiting, Intercom, Caller Id Display, Speeddial, Anonymouscall(hide Caller Id), Callforward(always/busy/no Answer), Calltransfer (attended/unattended), Callparking/pick-up (depending On Server), Redial, Do-not-disturb, Auto-answering, Voicemessage(with Server), 6-wayconference, Hotline, Hot Desking. 4. Two (2) Units – Laptop A. Processor: Intel I7 Or Amd Ryzen7 Processor (or Higher) B. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) C. Operating System (os): Windows 11 Pro Or Higher D. Memory: 16 Gb (or Higher) E. Storage: 500 Gb Ssd (or Higher) F. Display: 14” Display G. Graphic Card: Integrated Graphics H. Camera: 1080p Fhd Ir/rgb Hybrid I. Wireless: Wi-fi 6e Ax211 2x2, Bluetooth 5.1 Or Above J. Ethernet Port Or Usb K. Power Cord: At Least 45w L. Warranty: 1 Year Courier Or Carry-in 5. One (1) Lot - Outdoor Video Wall W/ Smart Led Solar Powered Light A. Led Panel I. Pixel Pitch 3.91mm Ii. Pixel Configuration 1r1g1b Iii. Led Type Smd1921 Iv. Brightness (max) 5000 Nit V. Color Temperature 3500k-10000k(adjustable) Vi. Viewing Angle H140° / V120° Vii. Pixel Density 65,536 Dots/m² Viii. Module Size 500mm×250mm Ix. Module Resolution 128x64 Dots X. Cabinet Size W500mm×h1000mm×d77mm Xi. Cabinet Resolution (w×h) 128×256 Dots Xii. Cabinet Weight 17.0 Kg ± 0.5 Xiii. Cabinet Material Aluminum Xiv. Operating Temperature/ Xv. Humidity -40℃~+60℃/10~80%rh Xvi. Storage Temperature/ Xvii. Humidity -40℃~+60℃/10~80%rh Xviii. Ip Rating Front Ip68/rear Ip66 Xix. Mounting: Ground Structured Support For Outdoor Video Wall Display Unit (181"w X 138"h) B. Four (4) Unit – Smart Led Solar Powered Light I. Independent Distributed Power Supply System Ii. Solar Powered W/ Smart Sensors Iii. High Quality Lithium Battery Iv. Input Voltage Ac 110~220v (+/-10%) V. Pole-mounted Installation Vi. Mounting: Ground Structured Support For Outdoor Smart Led Solar Powered Light C. One (1) Lot - Controller Required: Quantity I. Must Have Sending Box, Receiving Card, And Light Sensor D. Accessories I. One (1) Unit - Vacuum Suction Ii. One (1) Unit - Structure/bracket 4.2x2.025m Iii. Nine (9) Units - Hdmi Cable (4k) 10 Meters Iv. Two (2) Units - 1500va/900w Line Interactive Ups E. One (1) Unit – Desktop Computer I. Processor: Intel I5 Or Amd Ryzen5 Processor (or Higher) Ii. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) Iii. Operating System (os): Windows 11 Pro Or Higher Iv. Memory: 16 Gb (or Higher) V. Storage: 500 Gb Ssd (or Higher) Vi. Display: 14” Display Vii. Graphic Card: Integrated Graphics Viii. Camera: 1080p Fhd Ir/rgb Hybrid Ix. Wireless: Wi-fi 6e Ax211 2x2, Bluetooth 5.1 Or Above X. Ethernet Port Or Usb Xi. Power Cord: At Least 45w Xii. Warranty: 1 Year Courier Or Carry-in 6. One (1) Lot – Security Software Licenses A. Access Rights Manager B. Patch Manager C. Serv-u File Transfer Protocol Server D. Serv-u Managed File Transfer Server E. Server Configuration Monitor F. Engineer's Toolset G. Ip Address Manager H. Log Analyzer I. Network Performance Monitor J. Security Event Manager K. Network Topology Mapper 7. One (1) Service - Electronic Permit Layout And Design (as-built Plan) 8. One (1) Service - Electronic Permit Layout And Design Signed By Pece 9. One (1) Lot - Security Software Licenses W/ Dashboard 10. One (1) Lot - Structured Cabling (including External Cabling) 11. One (1) Lot - Roughing-in Materials 12. One (1) Service - Network Design And Consultation 13. One (1) Service - Project Management Services 14. One (1) Service - Temporary Facility (temfacil) For 30 Days 15. One (1) Service - Installation & Configuration 16. One (1) Service - Network Configuration Services 17. One (1) Service - User's Training And Knowledge Transfer 18. One (1) Service - Scaling And Optimization 19. One (1) Service - Manpower Cost 20. One (1) Service - Mobilization Cost 21. One (1) Service - Forwarding Cost 22. One (1) Year - Support Warranty E.18 Campus Data Center Upgrade 1. Non-electrical Components A. Seven (7) Units - Data Racks I. 1200mm Deep Static Rack Cabinet. Ii. Rack Capacity Must Be 42u Iii. Must Be Equipped With Casters And Leveling Feet Iv. Front And Back Doors Must Be Perforated V. Must Have A Load-carrying Capacity Of 950 Kg Or Higher Vi. Optional: Front And Side Stabilizers B. Three (3) Units - Gpu Server I. Must Have Warranty Support (4hr Resp) Ii. Gpu Server Add Ons Iii. Management Controller With 3-year Subscription For Server Endpoint Iv. Console Manager With 3-year Software Subscription C. One (1) Unit - Telephone Terminal Cabinet (ttc) I. The Ttc Must Be Made With Stainless Steel (304 Or 316) Gauge 16. Ii. At Least (800mm X 500mm X 200mm), With Canopy And Locking Mechanism. Iii. Water-resistant 2. Electrical Components A. One (1) Lot - Power Management System I. Design And Install Based On The Requirements Of Section 5.b (electrical Works Services) B. Fourteen (14) Lot - Power Distribution Unit I. 2 Units Shall Be Installed Per Data Rack. Ii. Input Voltage (v): 200-230 Iii. Input Plug Type: Iec 60309 32 A 2p + E Iv. Input Current Limit: 32 A V. Load Capacity: 7400 Va Vi. Network Frequency: 47...63 Hz Vii. Outlet Type And Quantity: (20) Iec 60320 C13, (4) Iec 60320 C19 C. One (1) Unit - Uninterruptible Power Supply 20kva (ups) And One (1) Unit - Uninterruptible Power Supply 5kva (ups) I. At Least 20kva/20kw Rackmount And 5kva/5kw Rackmount 1. Input: A) Ac Input Nominal Voltage (single-phase): 220/230/240 Vac, 3 Wire (l + N + G), Connected Via Hardwire. B) Ac Input Nominal Voltage (three-phase): 380/400/415 Vac, 5 Wire (l1 + L2 + L3 + N + G), Connected Via Hardwire. C) Ac Input Voltage Range: 160 – 285 Vac (l-n) At Full Load, While Providing Nominal Charging To The Battery System; Or 100 – 160 Vac (l-n) At 50% Load, While Providing Nominal Charging To The Battery System. D) Input Frequency Range: 40-70 Hz, Auto-selecting. E) Online Input Power Factor: 0.99 For 75% And 100% At 230 Vac. F) Green Mode Input Power Factor: ≥ 0.95 (for Resistive Load ≥ 25%) At 230 Vac.) At 230 Vac G) Input Current Distortion: <4% For 50% Resistive Load, <3% For 100% Resistive Load. H) Surge Protection: 600 Joules 2. Output: A) Ac Nominal Output Voltage: Single-phase B) Single-phase: 220/ 230/ 240 Vac. Models Are Factory Set At 230 Vac. C) 3-phase: 380/400/415 Vac. Models Are Factory Set At 400 Vac. (for 20kva) D) Output Frequency: 50/60 +/- 4 Hz (auto-sense). 3. Battery: A) Battery Type: Maintenance-free Sealed Lead-acid Battery With Suspended Electrolyte, Leakproof. 4. Installation: A) All Materials To Be Used In The Installation Should Be Included. From The Tapping Point To Ups. D. One (1) Unit - Generator With Automatic Transfer Switch (ats) I. 50kva Generator With Built-in Ats Or Ats Ready Ii. Automatic Start, Electric Start Iii. Phase: 3-phase/1-phase Iv. Operating Mode: Silent/soundproof V. Frequency Rating (hz): 50-70 Vi. Voltage Rating (v): 220-240 Vii. Engine Type: Turbo Diesel Viii. Large Capacity Fuel Tank Ix. Cooling System: Water Cooled X. Protection System: Low Oil Alarm, Temperature Sensor Xi. Should Include Installation And Configuration Services E. One (1) Set - Precision Air Conditioning Unit (pacu) I. Cooling Capacity: 7 Tr (20kw Or 75,400 Btu/hr) Ii. Power Supply: 230 Volts/60 Hz./3 Phase/pe Iii. System Type: Air-cooled Non-inverter Compressor Iv. Air Circuit: 1. Air Direction - Downflow Vertical Discharge 2. Air Inlet Into The A/c On A Large Surface From The Top Of The Unit V. Refrigerant Circuit: 1. Equipped With An Open Refrigerant Circuit The Basic Version Consists Of The Following Components: A. Fully Hermetic, Variable-speed Dc Scroll Compressor B. Oil Separator C. High-performance Evaporator With A Large Surface Area D. Liquid Receiver With Rota Lock On-off Valve And Safety Valve E. Dehydrating Filter F. Liquid Sight Glass G. Thermostatic Electronic Expansion Valve H. High-pressure Switches With Manual Resetting I. Needle Valves For The Refrigerant Change For Pressure Control J. External Welded Connections Vi. Standard Functions: Cooling Mode, Humidification & Dehumidification Mode Vii. User Terminal: 1. 64 X 120 Pixel Backlit Lcd Display And 6 Backlit Keys To Move Between And Change Parameters. 2. Set The Operating Parameters, Monitor The Trend Of The Main Working Parameters, And Read Any Alarm Messages. 3. Capable Of Enabling The Following Functions: A. Temperature And Humidity Control B. Setting Double Temperature And Humidity Set Point C. Complete Alarm Detection System D. Alarm Event History Storage E. Automatic Restart When Power Returns After A Cutout F. Remote Switching On/off Of The Unit G. Graphical Display With Icons Displaying The State Of The Unit Components H. Time Bands For Differential Weekly Switching On/off Of The Unit I. Management Of The Local Network With Setting The Rotation Of One Or Two Units In Standby J. Alarm Sequence History With Up To 100 Alarm Events Viii. Fan Section (indoor): 1. Radial Fan With Electronically Commutated (ec) Motor 2. High-efficiency Ec Motor With Wear-resistant And Maintenance-free Ball Bearing 3. Variable Speed Motor Modulating Fan Speed According To Load Density 4. Eurovent Certification 5. Ce Certification Ix. Air Filter: 1. Made From Self-extinguishing, Synthetic Fiber Cellular Material. 2. Large Filter Surface, Small Pressure Loss, Long Service Life, And Easy Replaceability X. Condenser: 1. Connections To The Remote Condenser 2. Witha Kit Of Legs For Vertical Discharge 3. With Rota Lock Shutoff Valves 4. Regulate The Fan Speed To Ensure Trouble-free Operations F. One (1) Unit - Dehumidifier I. At Least 80 Liters Capacity Ii. Adjustable Humidistat Iii. Auto Restart Iv. Automatic Bucket Full Shut-off V. Automatic Humidistat Control Vi. Bucket Full Indicator Light Vii. External Drain Connect Viii. Removable Water Tank Ix. Washable Air Filter 3. Safety Components A. Eight (8) Units - Fire Suppression System I. Hfc236fa (fe36) / /hcfc-123 Ii. At Least 20 Lbs Iii. Non-residual Iv. Non-corrosive V. Lifetime Chemical Efficacy Vi. Built-in Sensor For Automatic Discharge Vii. Should Include Mounting Plates And Installation Service B. Two (2) Units - Metal Door With Panic Lock Mechanism Note: Included In E-classroom, E-conference Room And Smart Led Solar Powered Light I. The Door Jamb Must Be Able To Hold The Weight Of The Metal Door. Ii. The Door Hinge Must Be Able To Contain The Stress Of The Sudden Swing Of The Metal Door Induced By The Panic Lock Mechanism. Iii. Panic Lock Mechanism Has Priority Over Electronic Security Locks For Exit. C. Four (4) Units - Environmental Monitoring System I. Temperature Sensor And Humidity Data Logger. Ii. Logging Capacity: 60000 Readings Or Higher. Iii. Alarm Status Indicator. Iv. Wired Or Wireless Connection Mode. V. Inclusion Of Cloud Access And/or Mobile Application For Data Access. Vi. Optional: Sms And/or Email Capability. 4. Warranty-three (3) Years Warranty A. Non-electrical Components I. Data Racks Ii. Telephone Terminal Cabinet (ttc) B. Electrical Components I. Electrical Management System Ii. Uninterruptible Power Supply 20kva Iii. Uninterruptible Power Supply 5kva Iv. Power Distribution Units V. 100 Kw Generator With Automatic Transfer Switch (ats) Vi. Air Conditioning Units Vii. Dehumidifier C. Safety Components I. Fire Suppression System Ii. Metal Door With Panic Lock Mechanism Iii. Environmental Monitoring System 5. Included Supply, Installation, And Configuration Services A. Civil Works Services I. Supply And Installation Of Telephone Terminal Cabinet (ttc) (800mm X 500mm X 200mm) With Canopy And Locking Mechanism. Ii. Supply And Installation Of 2 Fire Rated Metal Door With Panic Locking Mechanisms 400mm(w) X 900mm(w) X 2100mm(h)(1-unit) Iii. Supply And Installation Of 2hr Fire-rated Wall Partition 4” Thick (40 Sqm.) Iv. Supply And Installation Of Anti-static Raised Flooring (75 Sqm.) V. Supply And Installation Of The Acoustic-type Ceiling (75 Sqm.) Vi. Supply And Installation Of Led Lighting With Complete Wiring Vii. Painting Inside The Data Center Viii. Water Proofing (covering Part Of Data Center) Ix. Supply And Installation Of Emergency Lights X. Installation Of Generator System Housing B. Electrical Works Services I. Creation And Installation Of An Electrical Design Supporting Ups Power, Air-conditioning, Emergency Light And Exhaust Fan System, With The Capability To Switch To A Generator System With Ats And Auto-start Function. Ii. Independent Circuits For Ups And Regular Power Distributed On A Per Rack Basis. Iii. Independent Circuits For Air Conditioning Systems (ahu) On A Per Unit Basis. Iv. Provision Of Ups Circuits For Security And Environment Monitoring Devices. V. Provision Of Circuits For Future Use. Vi. Installation Of Grounding Systems. Vii. Electrical Panel Boxes Should Be Equipped With Surge Suppressors, Low Voltage Detectors And Power Monitoring. C. Mechanical Works Services I. Plumbing Works For Ahu Drain System. Ii. Plumbing Works For The Dehumidifier Drain System. Iii. Supply And Installation Of Electrical Wire Ways From Main Electrical Panel To Generator Location. Iv. Supply And Installation Of Data Wire Ways For Inter-rack Connections. 6. One (1) Service - System Design Services 7. One (1) Service - Cabling Works 8. One (1) Service - Structured Cabling (including External Cabling) 9. One (1) Service - Forwarding Cost 10. One (1) Service - Project Management Services 11. One (1) Service - User Acceptance Testing (uat) 12. One (1) Service - User's Training And Knowledge Transfer 13. One (1) Service - Scaling And Optimization 14. One (1) Service - Manpower Cost 15. One (1) Service - Mobilization Cost E.19 Data Center Network Switches 1. Two (2) Units - Core Switch A. Hot Swap Power Supply B. Open Ports Configuration With At Least 16 100g Qsfp28 Ports C. Open Ports Configuration With At Least 4 25g Qsfp28 Ports D. All Open Ports Enabled E. Zero License Fee For Modules Inserted I. Four (4) 100 Gbit Fiber Module Ii. Four (4) 40 Gbit Fiber Module Iii. Six (6) 10 Gbit Copper Module Iv. Six (6)10 Gbit Fiber Module V. 100 Gbit Dac Cable 2. Two (2) Units - Core Fiber Switch 3. One (1) Unit - Router A. Redundant Power Supply B. Load Balancing/failover Capability For Unequal Bandwidth C. At Least 12 1gbit Ports D. All Open Ports Enabled E. Zero License Fee For Modules Inserted F. One (1) Lot - X 10g Sfp+ Ports G. One (1) Lot - 10gbit Fiber Module (sfp / Sfp+ / Sfp28) H. One (1) Lot - 10gbit Copper Module 4. One (1) Unit- Top Of Rack (tor) Switch Poe A. Redundant Power Supply B. At Least 48 Gbit Ports C. All Open Ports Enabled D. Zero License Fee For Modules Inserted E. Four (4) X 10g Sfp+ F. Two (2) 40g Qsfp+ G. 48 Poe Ports H. Poe Out Standard: 802.3af/at I. Max Power Output Per Port (input 18-30 V): 1000 Ma J. Max Power Output Per Port (input 30-57 V): 570 Ma K. Total Power: 700w L. Six (6) 40gbit Fiber Module 5. One (1) Unit - Top Of Rack (tor) Switch Non-poe A. Redundant Power Supply B. At Least 48 Gbit Ports C. All Open Ports Enabled D. Zero License Fee For Modules Inserted E. Four (4) X 10g Sfp+ F. Two (2) 40g Qsfp+ G. 48 Poe Ports H. Six (6) 40gbit Fiber Module 6. One (1) Unit - Management Switch A. Redundant Power Supply B. At Least 24 Gbit Ports C. 10gbit Fiber Module D. Sfp+ To Sfp+ Connector 7. Two (2) Units - Access Point Cap-ac 8. One (1) Service - Electrical And Racking Design Services 9. One (1) Service - Network Design And Consultation 10. One (1) Service - Project Management Services 11. One (1) Service - Switch Installation 12. One (1) Service - Network Configuration Services Supplier 13. One (1) Service - Training And Knowledge Transfer 14. One (1) Service - Scaling And Optimization Of Data Center Network Switches 15. One (1) Service - Manpower Cost 16. One (1) Service - Mobilization Cost 17. One (1) Service - Forwarding Cost 18. One (1) Year - Support Warranty E.20 Data Center Compute System & Data Center Block And File Storage 1. Eight (8) Lots - Hci Cluster: A. Form Factor: 2u Rack Server B. A Total Of Eight (8) Hci Nodes C. Must Have 2x 6426y 16c 185w 2.5ghz Processor Per Node D. Must Have A Total Of 256gb 2rx8 4800mhz Memory Per Node. Can Support Up To 8tb Of Memory E. Network Interfaces Must Have A 2x 2-ports 10gb Base-t F. Storage Drives Must Have 2.5" Cache Drives And 3.5" For The Capacity Drives G. Must Have 2x M.2 Nvme 960gb Read Intensive Pcie Gen 4 Ssd For The Boot Drive H. Must Have A Total Effective Capacity Of At Least 500 Tb And 700 Tb Raw Capacity On Rf2 With 0% Savings I. Must Have Redundant 1100w Platinum Psu J. 2u Rack Mounted K. Software Inclusion: I. Must Include Rhel For Virtual Datacenters Premium 3 Years. Ii. Must Include Microsoft Center Licenses, Cals, And Sql Server With Software Assurance For The Education Sector. L. Hypervisor Support: I. Supports Industry-standard Hypervisors Like Vmware Esxi, And Native (bundled) M. Hci Features: Ii. Hci Licenses Should Be Oem Iii. Can Support Heterogeneous Clusters And Storage Nodes Only Iv. Must Have Vm-centric Snapshots & Clones V. Must Have Data Tiering Vi. Must Have Online Cluster Grow/shrink Vii. Must Have Data Path Redundancy Viii. Up To 2 Tunable Redundancy Factor Ix. Basic Compression (lz4) - Inline And Post-process X. Deep Compression (lz4hc) - Greater Efficiency For Cold Data Xi. Cache Deduplication Xii. Capacity Deduplication Xiii. Volume Groups - For In-cluster Vms Xiv. Async Replication (rpo = 1 Hr Or Greater) Xv. Application Consistent Snapshots Xvi. Client Authentication Xvii. Centralized Management Can Support Multi-cluster Management Xviii. Infrastructure Management, Monitoring, And Health Xix. Enterprise Authentication And Rbac Xx. Rest Apis Xxi. Comprehensive Search Xxii. Management Can Support The Report Xxiii. Management Has A Customizable Dashboard Xxiv. Management Can Plan And Forecast The Capacity Xxv. Resource Inefficiency Detection And Right-sizing Xxvi. Low-code/no-code Operations Automation Xxvii. Must Have 50tib Licenses For Unified Storage N. Hardware Management Features: I. Configure An Hci Node Ii. Update An Hci Node Iii. Integrate Into External Apps Through Integrators Or Rest Apis Iv. Manage Servers, Network, And Storage V. Auto-discover Systems Vi. Monitor And Track Multiple Systems, And Handle Faults Including Call Home Or Equivalent Vii. Manage Server, Network, And Storage Updates With Policies Viii. Configure Multiple Servers With Software Patterns Ix. Install Operating Systems And Hypervisors X. View The Status Summary Of All Hardware Components Xi. Encapsulation, Which Enables Us To Configure The Management Software To Change The Firewall Rules For The Devices So That Incoming Requests Are Accepted Only From The Management Software Xii. Compliant With Nist Sp 800-131a Or Fips 140-2. Hardware Management Should Support Self-signed Ssl Certificates (issued By An Internal Certificate Authority) Or External Ssl Certificates (private Or Commercial Ca). Xiii. Must Include An Audit Log That Provides A Historical Record Of User Actions, Such As Logging On, Creating Users, Or Changing User Passwords. O. Hardware Management Platform Should Have A Mobile App With The Following Features: I. View The Status Summary Of All Hardware Ii. Monitor The Detailed Status Of Each Device Iii. Monitor Inventory Of Each Device Iv. Monitor Audit Events, Hardware And Management Events, Alerts, And Jobs. V. Performs Power Actions On The Device. Vi. Act On Common System-level Tasks To Minimize The Risk Of Disruptions And Downtime. Vii. Forward Emails To Share Inventory, Alerts, And Event Information. Viii. Perform Initial Configuration Of Servers, Retrieve Diagnostic Information (virtual Lcd) And Perform Actions, Initiate Hardware Management From A Mobile Device. Ix. Monitor Hardware Inventory For Unexpected Component Changes, And Simply Log The Event Or Prevent Booting X. Enforces Cnsa 1.0 Level Security Xi. Enables Administrators To Manage And Synchronize Configurations And Firmware Levels Across Multiple Servers Xii. Should Be Available On Both Ios And Android. Xiii. The Hci Should Provide A Single Unified Management Console For The Management Of The Entire Environment Including Virtualized Environment As Well As Software Defined Storage Environment, Underlying Hardware, And Associated Components. Xiv. The Hci Should Provide Enterprise Data Services Such As Deduplication And Compression With Erasure Coding Completely In Software Without Dependency On Any Proprietary Hardware. Xv. System Management Must Be Able To Provide Proactive Alerts For Processors, Voltage Regulators, Memory, Internal Storage, Fans, Power Supplies, Raid Controllers, And Server Ambient And Sub-component Temperatures. Xvi. Must Be 100% Software-defined Without Dependency On Proprietary Hardware Or Networking Components. Xvii. Supports Differing Cpu & Memory Configurations Of Nodes Within The Same Cluster Xviii. The Hyper-converged Platform Must Have Fips 140-2 Certification Xix. The Hyper-converged Platform Must Have Common Criteria Security Certification. 2. One (1) Lot - Kvm Switch With Lcd Console A. 16-ports Kvm Switch And One (1) Lcd Console. Must Be The Same Brand As The Hci Nodes. B. Must Be Able To Handle 2 Concurrent Users. C. Local User Connection For Kvm: Vga + Usb D. Maximum Number Of Target Systems: 16 E. Maximum Video Resolution: 1600x1200 (4:3),1680x1050 (wide) 3. Thirty-two (32) Roll - Green Cat6 Cable 4. One (1) Service - Storage System Installation 5. One (1) Service - Storage Network Configuration Services 6. One (1) Service - System Design Services 7. One (1) Service - Application Installation 8. One (1) Service - Project Management Services 9. One (1) Service - User Acceptance Testing (uat) 10. One (1) Service - User's Training And Knowledge Transfer 11. One (1) Service - Scaling And Optimization Of Data Center Compute System 12. One (1) Service - Manpower Cost 13. One (1) Service - Mobilization Cost 14. One (1) Service - Forwarding Cost 15. Three (3) Years - Software Warranty 16. Three (3) Years - Support Warranty E.21 Data Center Backup And Recovery System 1. One (1) Lot - Enterprise On-premises Data Backup System - Hardware A. Must Have At Least 4410t 10c 150w 2.7ghz Processor. B. Must Have At Least 32gb 4800mhz Memory With Expansion Of Up To 8tb. C. Must Have 4-ports 10gb Base-t. D. Must Have At Least 22tb Storage Capacity. E. Must Have 2x M.2 480gb Read Intensive Sata Ssd. F. Raid Controller Should Support Raid 0,1,10,5,50,6 Configurations With 4gb Cache. G. Must Include Microsoft Windows Server Standard And Client Access Licenses (cals) For The Education Sector. 2. One (1) Lot - Enterprise On-premises Data Backup System – Software A. The Backup And Recovery Solution Should Work With Virtualized Infrastructure Based On Version 6.x, 7.0, 8.0, Microsoft Hyper V 2022 Or Higher And Later Versions, Nutanix Ahv Version 6.5 And Later, And Red Hat Virtualization Version 4.4 Sp1 (red Hat Virtualization Manager Version 4.5.0 Or Later) In A Single Product B. The Solution Should Provide A Centralized Console To Coordinate Backup, Replication, Recovery Verification And Restore Tasks. It Is Also Used To Set Up And Manage Backup Infrastructure Components. C. The Solution Must Provide Immutability To Prohibit Modification Or Deletion Of Backup Data As A Result Of Malware Activity Or Ransomware Attacks. D. Must Provide Agentless Protection Without The Need To Install Agents Inside Each Vm Running On Vmware, Hyper-v, Nutanix Ahv, And Rhv Platforms E. Must Support Direct Attached Storage, Network Attached Storage, Deduplicating Storage Appliances, And Object Storage As Backup Repositories F. Ability To Utilize Forever Forward Incremental, Forward Incremental & Reverse Incremental Backup Methodology. G. Ability To Perform Agentless Transaction Log Backup And Replay And Database Restore To Original Or New Sql Server H. Ability To Select And Choose Multiple Mssql Databases When Performing A Mass Database Export, Restore, Or Instant Recovery. I. The Solution Must Provide Automated Tests And Verification Of Each Backup Or Replica To Assure Recoverability In Case Of Production Failure. The Verification Must Include Vm Files, Os, And Applications Including Custom Testing Using Scripts J. The Solution Must Provide 105 Options To Perform Recovery. K. The Solution Must Have The Ability To Provide Recovery Delegation For Individual Or Group Vms L. Included Built-in Aes 256-bit Encryption, Compression, And Deduplication In A Single Product Without An Additional Option To Purchase M. The Solution Should Support Direct Backup To Object Storage Such As Amazon S3, Google Cloud Storage, Ibm Cloud Object Storage, Microsoft Azure Blob Storage, And Any S3-compatible Object Storage On-premise And In The Cloud. N. Ability To Combine One Or More Backup Repositories Or Object Storage (aws S3, Azure Blob, Gcp & Any S3 Object Compatible) Repositories And Tier Backup Data From Performance To Capacity And Archive Tier. O. Provide Agent-based Data Protection For Physical Server On Windows Or Linux With Support For Bare Metal Recovery, Export As Virtual Disk & Able To Perform Instant Recovery To Vmware Platform, Microsoft Hyper-v, And Nutanix Ahv P. Able To Provide Secure Access To The Backup Console With Optional Two-factor Authentication (2fa) That Is Based On Time-based One-time Passwords (totp) 3. Twenty-four (24) Months - Cloud-based Disaster Recovery System A. The Solution Must Have The Ability To Provide Recovery Delegation For Individual Or Group Vms B. The Solution Should Support Direct Backup To Object Storage Such As Amazon S3, Google Cloud Storage, Ibm Cloud Object Storage, Microsoft Azure Blob Storage, And Any S3-compatible Object Storage On-premise And In The Cloud. C. Provide Agent-based Data Protection For Physical Server On Windows Or Linux With Support For Bare Metal Recovery, Export As Virtual Disk & Able To Perform Instant Recovery To Vmware Platform, Microsoft Hyper-v, And Nutanix Ahv D. The Billing Of Dr Site Resources Must Only Be In Effect When The Resources Are Used. E. Must Provide For Monitoring And Periodic Conduct Of Dr Drills F. Must Have The Capability To Instantiate Test Instances For Non-disruptive Testing G. Must Be Able To Set Up And Initiate Continuous Data Replication. H. Must Provide Replication For At Least 10 Servers 4. One (1) Service - Electrical And Racking Design Services 5. One (1) Service - Network Design And Consultation 6. One (1) Service - Disaster Recovery Site Provisioning And Testing 7. One (1) Service - Application Installation 8. One (1) Service - Project Management Services 9. One (1) Service - Network Configuration Services 10. One (1) Service - User's Training And Knowledge Transfer 11. One (1) Service - Scaling And Optimization Of Data Center Backup And Recovery System 12. One (1) Service - Forwarding Cost 13. One (1) Service - Manpower Cost 14. One (1) Service - Mobilization Cost 15. Three (3) Years - Support Warranty E.22 Cloud Infrastructure-as-a-service 1. Cloud Infrastructure Subscription A. Payment Terms I. Basc Shall Pay The Vendor A Fixed Monthly Fee For All Cloud-related Services. Ii. The Accumulated Payables Within The Validity Of The Subscription Period Must Not Exceed The Budget Set For This Procurement. Iii. All Activated Additional Resources Must Be Billed Not Less Than 30 Calendar Days From The Date Of Activation, Or 60 Calendar Days Should It Be Activated Beyond The Agreed “cut-off” Period. Iv. All Chargeable Costs Must Be Inclusive Of Vat. V. Basc Shall Reserve The Right To Take Over The Root Account And Pay The Billings Directly. To Avail Of This Prerogative, Basc Must Inform The Vendor In Writing At Least 3 Months Prior To Contract Expiration. B. One (1) Lot – Cloud Management Services I. The Vendor Shall Have Cloud Provider Preference, Provided That The Cloud Provider Adheres To The Standards Stated In Section 2.b. Ii. The Vendor Shall Migrate Agreed-upon Resources From The Current Cloud Computing Service Platform Or Its Current Site To The New Cloud Computing Platform In Coordination/collaboration With Basc’s It Team. Iii. The Vendor Shall Provide Counterpart Technical Support In The Setup, Configuration And Monitoring Of Cloud Infrastructure. 2. Cloud Infrastructure Standards A. Cloud Infrastructure Providers Should Have Global Presence. B. Certified For Information Security Management Systems (iso 27001) C. Certified For Code Of Practice For Information Security Controls Based On Iso/iec 27002 For Cloud Services (iso/iec 27017) D. Certified For Code Of Practice For Protection Of Personally Identifiable Information (pii) In Public Clouds Acting As Pii Processors (iso/iec 27018) 3. Data Center Standards A. Must Have The Capability To Deploy A Highly Available And Multi-zone Disaster Recovery Solution Across Multiple Data Centers Within The Asean Region B. Must Have The Ability To Provide A Managed Relational Database Service That Can Be Integrated With Any Chosen Software Solutions. C. Must Have The Capability To Deploy Standard Virtual Machines And Cloud-native Services. 4. Account Management A. The Account Ownership And Its Related Services Shall Belong To The Vendor. Access Rights Should Be Given To Basc, As Deemed Necessary, To Perform Monitoring Services Related To The Project 5. Warranty A. Cloud Management Services - One (1) Year 6. One (1) Lot - Secure Access Path A. Split Tunneling: Routes Only Specific Traffic Through The Vpn. B. Always-on Vpn: Maintains A Constant Secure Connection. C. Kill Switch: Disconnects If The Vpn Tunnel Fails. D. Dynamic Multipoint Vpn (dmvpn): For Dynamic And Scalable Vpn Networks. 7. One (1) Service - Cloud Infrastructure Design And Consultation Services 8. One (1) Service -vpn Network Design And Consultation 9. One (1) Service - Cloud Resources Provisioning And Testing 10. One (1) Service- Project Management Services 11. One (1) Service - User's Training And Knowledge Transfer 12. One (1) Service - Manpower Cost 13. One (1) Service - Mobilization Cost 14. Three (3) Years - Support Warranty E.23 Ip-pa System And Ip-pabx System 1. Ip-pabx System Components A. One (1) Unit - Ip Phone System I. Base Users / Max Users Up To 300 / 500 Ii. Max Concurrent Calls 60 / 120 Iii. Base / Max Call Center Agents 300 / 500 Iv. Max Fxs Ports 16 V. Max Fxo/bri Ports 16 Vi. Max Gsm/3g/4g Ports 6 Vii. Max E1/t1/j1 Ports 2 Viii. Expandable D30 2 Ix. Nfc Read/write X. Ethernet Interfaces 2 X (10/100/1000 Mbps) Xi. Hard Disk 1 Sata (up To 2tb) Xii. Usb 1 (usb Portable Ssd, Up To 2tb) (usb Flash Drive, Up To 256) Xiii. Power Supply Ac 100-240v 50/60hz Xiv. Form Factor 1u Rackmount Xv. Environment Operation Range: 0°c To 40°c, 32°f To 104°f Storage Range: -20°c To 65°c, -4°f To 149°f Humidity: 10-90% Non-condensing B. One (1) Unit - D30 Expansion Module I. Dsp Module, Used To Expand The Capacity Of Pbx. Ii. Extensions Increase By 100 And Concurrent Calls Increase By 30 Additionally. C. One (1) Unit - Ex 08 Module I. Must Support Up To 4 Modules (8 Rj11 Ports). D. Two (2) Units - O2 Module I. Ports 2 Rj11 Fxo Ports Ii. Supported Model S20, S50, S100, S300 Iii. Ring Frequency Detection 15~50 Hz Iv. Ring Voltage Detection 30+ Vrms (depending On The Fxo Mode) V. Termination Pstn Lines Vi. Echo Cancellation Signaling Modes Foreign Exchange Office: 2-way Connection To Prx Or Key System Trunk. Foreign Exchange Station Defined Network: Provides Access To Major Carrier Services. Private Line Automatic Ringdown (plar)-point-to-point Unswitched Connections. E. One (1) Unit - Voip Gateway I. Rj11 Fxo Ports Ii. Lan 1 10/100mbps Iii. Protocol Sip (rfc3261), Iax2 Iv. Transport Udp, Tcp, Tls, Srtp V. Codec G.711 (alaw/ulaw), G.722, G.723, G.726, G.729a, Gsm, Adpcm Vi. Voice Capability Itu-t G.168 Lec Echo Cancellation, Dynamic Jitter Buffer, Vad, Cng, Plc Vii. Dtmf Mode Rfc2833, Sip Info, In-band Viii. Fax T.30 Ix. Qos Diffserv, Tos, 802.1 P/q Vlan Tagging X. Network Dhcp, Ddns, Openvpn, Pppoe, Static Route, Vlan Xi. Network Protocol Ftp, Tftp, Http, Https, Ssh Xii. Management Protocol Radius Xiii. Signaling Fxs Loop Start, Fxs Kewlstart Xiv. Caller Id: Bell202, Etsi (v23), Ntt (v23-japan), And Dtmf-based Cid Xv. Disconnect Methods: Busy Tone, Polarity Reversal Xvi. Fxo Connectivity: Programmable Ac Impedance, Hangup Detection, Answer Detection, Caller Id Detection Xvii. Power 12v, 1a Xviii. Mounting Desktop, Wall-mount Xix. Compatibility: Interoperable With Asterisk, Lync Server, Freepbx And Certified With Elastix F. Forty-six (46) Units - Ip Phone Handset I. Must Have A Linux Operating System Ii. Must Have 132x64 2.3” Dot-matrix Display Iii. Must Have 6-way Audio Conference Iv. Must Have At Least 600 Call Logs V. Must Have At Least 1000 Local Phonebook Vi. Must Have At Least 1000 Remote Phonebook Vii. Must Have G.722, Opus Wideband Codec Viii. Must Have G.711a/u,g.726,g.723.1, G.729a/b, Ilbc Narrowband Codec Ix. Must Have 2x10/100/1000mbps Network Rate X. Must Have Power Supply Poe Xi. Must Have An Ehs Headset Xii. Must Have Desktop Stand G. Two (2) Units - Enterprise Ip Phone I. Must Have A 3.5-inch Main Color Screen And 2.4-inch Extended Screen For Dss Keys Ii. Hd Audio On Speakerphone And Handset Iii. Support 6-way Audio Conference Iv. Line Keys On The Main Display V. 6 Dss Keys On The Extended Screen, Up To 30 Dss Keys Via 5 Pages Vi. Built-in Bluetooth 4.2, Support Bluetooth Headset; Support Wi-fi Dongle Vii. Support Ehs Wireless Headset Viii. Dual Gigabit Ports, Integrated Poe Ix. Stand With 2 Adjustable Angles Of 45 And 50 Degrees 2. Ip-pa System Components A. One (1) Unit - Digital Ip Network Broadcasting Client Management Software I. Support Each Audio Terminal’s Operation, Audio Streaming Transmission Management, Broadcasting From Each Audio Terminal, And Full Duplex Exchange Of Audio. It Adopts B /s Architecture And Supports Terminal Management, User Management, Program Broadcasting Management, Audio Files Management, Record Storage, And Internal Communication Scheduling Through Web Login. Ii. Support Program Database Sources Management, Timing Broadcast, And Real-time Media Service Vod For All Audio Terminals, Program Broadcasting For Each Terminal, And Data Interface Service For Each Audio Workstation Iii. Support Full-duplex Voice Data Exchange, Paging And Call From Each Intercom Terminal, Various Calling Modes (like One Button To Call, One Button To The Intercom, One Button To Ask For Help, One Button To Alarm, And So On), Automatic Answer, Manual Answer, And Custom Answer Tone. Iv. Support Multiple Calling Strategies, Including Call Waiting, Call Forwarding, No Answer Reminder, And Custom Setting For Time Strategy And Forwarding Strategy. It Supports Setting Up The Call Strategy Of The Intercom Terminal. It Can Customize The Call Time From 0 To 180s Or No Limit. It Can Choose Whether To Answer Automatically Or Not. It Also Supports Customizing The Choice Of Calling Ringtones And Waiting Ringtones. V. Support Terminal Short Circuit Linkage Trigger. Users Can Arbitrarily Set The Trigger Scheme And Trigger Terminal Quantity. The Trigger Scheme Includes Short Circuit Output, Music Playback, And Patrol Alarm. Vi. Support To Program Timing Tasks, Multiple Timing Programs, Support Selecting Any Terminal, And Setting Any Time. Support Timed Task Execution Test, Setting Repetition Period And A Variety Of Audio Source Selections For Timing Tasks (music Playback, Sound Card Acquisition, Terminal Acquisition). Vii. Support Multiple Schemes Of Timed Ringing To Be Enabled At The Same Time. Viii. Support Multiple Tasks To Be Carried Out At The Same Time Ix. Support All Schemes To Be Enabled/ Disabled By One Button. X. Support Bell Scheme Cloning, Task Execution, And Stop Control, Disable And Enable The Function Of A Timing Task. Xi. Support Timing Patrol, Support Execution Time And Repetition Period Of The Custom Patrol Task, 0-30s Customized Interval Of The Indicator Flashing, And External Lock-free Button Short-circuit Switch (with 3.3v Led Indicator Light). Xii. Support Today's Task List View, Which Makes It Easy To Manage All Scheduled Task Information And Execution Status Performed Today. Xiii. Support Terminal Tamper Alarm. Trigger Terminal Alarm When A Terminal Is Demolished Or Trigger Alarm For Other Terminal Linkages. Support Alarm Task To Automatically Cancel The Alarm Function. Xiv. Support External Power Management Of Audio Terminals, Timing Switch O,n And Delay Off. Xv. Support Light Control And The Light Mode Configuration. Xvi. Support All Zones, Part Of The Zones Fire Linkage, N±n Fire Mode, Manual Alarm And Digital Alarm Mixing, Alarm Configuration To Trigger Terminal Collection Tasks Xvii. Support Terminals’ Login Password Central Management, Multiple Priority Management, Easy Automatic Authorization, Task Priority, Terminal Priority, And User Priority Customization. Xviii. Support Sub-control Management Of Multi-users And Arbitrary Degrees To Achieve Remote Program Broadcasting Management. Xix. Support Multi-user, Multi-level, Specified Permissions, Specified Functions, And Specified Terminals To Classify And Manage The Background. Xx. The Terminals Support Three-wire And Four-wire Volume Control Functions; The Four-wire Volume Control Needs An External Power Supply. Xxi. Support To Set The Zones And Control The Power To The 8-channel Terminal Through Web Background Or Sub-control Client Side. Xxii. Support To Set The Time Display In The Terminals Can Set 0 - 6 Level Brightness Value, It Can Realize No Time Display Mode When The Terminal Is Offline. Xxiii. Support Broadcast, Intercom, Real-time Acquisition, Terminal Monitoring ,and Recording. Xxiv. Support Remote On-demand Operation By Remote Controller. Xxv. Support Terminal Audio Acquisition And Broadcast Function. Xxvi. Support Local Audio Collection Function, The Local File Can Be Played To Any Designated Terminal. Xxvii. Support Scheduled Offline Ringing Function, Which Enables The Terminal To Perform Scheduled Ringing Tasks When The Network Is Disconnected Xxviii. Support Offline Downloading Of Ringing Tasks; Xxix. Support To Clear The Offline Tasks On The Terminals. Xxx. Support The Telephone Broadcasting Function, Realize The Function That The Telephone Initiates All Zone Broadcasting Or Part Of The Zones Or Single Zone Broadcasting. Xxxi. Support Remote Firmware Upgrade To The Terminal, No Need To Upgrade Locally, Which Can Reduce The Maintenance Work. Xxxii. Support Background Skin Change Function, You Can Switch Skin Themes Freely According To Your Preference. Xxxiii. Support Terminal Details Exporting Function, Support To Export The Configuration Details Of The Current System Terminal By Table. Xxxiv. Support Batch Modification Of The Time Of Scheduled Tasks And Execution Terminal. Xxxv. Support Sdk Kits, Standard Mfc Dynamic Link Libraries, And Http Protocols To Achieve Integration With Third-party Platforms. Xxxvi. Support The Terminal To Self-define The Area Division, Realizing The Management Of The Terminal’s Real-time Status According To Different Zones. Xxxvii. The Log Records The System Operation Status And Records The System Operation And Terminal Working Status In Real-time. Each Paging, Call, And Broadcast Operation Is Recorded. Xxxviii. The System Is Compatible With Any Network Structure Such As Router, Switch, Bridge Gateway, Modem, Internet, 2g, 3g, And 4g. Xxxix. Windows Service Mode, Support Win7, Server2008, And Higher Systems. Xl. It Uses The Background System Service To Run, Which Is An Enterprise-level Standard Server Working Mode. The System Can Run Automatically When The System Is Turned On. It Has Higher Stability And Reliability Than The Software Running In The Foreground Of The Interface. B. One (1) Unit - Desktop Computer I. Processor: Intel I7 Or Amd Ryzen7 Processor (or Higher) Ii. Memory: 16 Gb Ddr4 Or Higher Iii. Form Factor: Tower Iv. Storage: At Least 500 Gb Ssd (or Higher) V. Graphics Processing Unit (gpu): 4gb Vram, Gddr5 (or Higher) Vi. Display: At Least 23.8” Hd Led Display (or Higher) Vii. Peripherals: Power Cords, Keyboard & Optical Mouse Viii. Chassis: Usb Ports, Audio Port, Mic Port, Power Switch, Reset Switch Ix. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) X. Operating System (os): Windows 11 Pro Or Higher Xi. Warranty: 1 Year Courier Or Carry-in C. One (1) Unit - 2kva Ups I. Must Have Capacity 2000va Ii. Must Support Input Rated Voltage 220vac~240vac 110vac~120vac Iii. Must Support Voltage Range 140vac~290vac 81vac~145vac Iv. Must Have A Rated Frequency Range Of 50hz Or 60hz V. Must Have Output Voltage 220/230/240 Vac 110/120 Vac Vi. Must Have Ac Voltage Regulation (batt. Mode) ±10% Vii. Must Have Frequency Range (batt. Mode) 50hz Or60hz±1hz Viii. Must Transfer Time 2-6ms Ix. Must Support Battery Type & Number 12 V/9 Ah X 2 X. Must Charging Voltage 27.4v±1% Xi. Must Have Indicators: Battery Mode Green Lighting, Ac Mode Green Lighting Xii. Must Have Alarm: Battery Mode Sounding Every 10 Seconds Xiii. Must Have A Low Battery Sounding Every Second Xiv. Must Have Overload Sounding Every 0.5 Second Xv. Must Have Fault Continuously Sounding Xvi. Must Have Protection: Full Protection Overload, Discharge, And Overcharge Protection Xvii. Must Operating Temperature 0°c ~ +40°c (+32°f ~ +104°f) Xviii. Must Operating Humidity 0~90% Rh(non-condensing) D. Two (2) Units - Desktop Intercom Paging Microphone I. With Desktop Design, It’s Built-in 7-inch Resistance Touch Screen By 800 × 480 Dot Matrix K600 + Kernel 65k Color, To Fulfill Clear Display And Sensitive Touch. Ii. With Numeric And Function Keys Interface. Iii. Support Paging To Single Or Multiple Zones, All Zones. Support Direct Paging Or Intercom With Terminal, Support Environmental Monitoring To Any Terminal, With Distance Up To 5 Meters. Iv. With Embedded Computer Technology And Dsp Audio Processing Technology, High-speed Industrial-grade Chips. V. Built-in 1 Channel Network Hardware Audio Decoding Module That Supports Tcp / Ip, Udp, Igmp (multicast) Protocol To Achieve 16-bit Stereo Cd Quality Network Audio Signal Transmission. Vi. It Is Compatible With Routers, Switches, Bridges, Gateways, Modem, Internet, 2g, 3g, 4g, Multicast, Unicast, And Other Arbitrary Network Structures. Vii. Support Full-duplex Two-way Intercom Function, Built-in Network Echo Cancellation Module. Viii. Support Two-way Intercom Between The Terminals, With A Network Delay Of Less Than 100ms, And Suppress The Network Echo Howling Completely. Ix. Support Hints Of Asking For Help Signal Ringing And Flashing Lights, One Key To Accept The Call, Intercom, Hands-free Calls And Receive Broadcast, To Achieve Quick Links. X. Support Multiple Paging Modes, Including Paging Waiting, Paging Forwarding, And Answer Reminding. Xi. Support For Answering Automatically, Manual Answering, And Support For Custom Answer Tone. Xii. Support The User-defined Setting Of Time For Call Forwarding, No Answer, And Call Waiting. Xiii. Built-in 2w Full-frequency Hi-fi Speaker, To Fulfill Two-way Conversation And Network Monitoring. Xiv. One Φ3.5 Headphone Jack And One Φ3.5 Mic Input Socket, Matching 95% Headphones And A Portable Microphone In The Market. Xv. With One Line Output For External Amplifier Expansion, And One Line Input For More Audio Source Transmission. Xvi. One-way Alarm Output For Short Circuit Trigger Can Be Cascaded With An External Alarm Device Or Access Control; One-way Short Circuit Input Can Be Used To Trigger Preset Voice Prompts (or Alarm) And Also Can Be Used To Control The Access Control To Linkage With Input Short-circuit Signal. Xvii. The Digital Products Are More Convenient For Extension, With No Limit By The Geographical Position, No Need To Increase Management Equipment In The Control Center, Sharing Network To Save Cabling And Simple Installation. Xviii. It Supports Remote Updating To The Hardware Terminal, With No Need To Upgrade Locally, To Reduce Maintenance Work And Make Simpler Operation. Xix. With 10 Buttons, Supports Customized One-button Paging And One-button Broadcasting. E. Twenty (20) Units - Wall Mount Speakers 30w I. The Equipment Is Designed With Embedded Computer Technology And Dsp Audio Processing Technology. Ii. Built-in 1-channel Network Hardware Audio Decoding Module, Supports Tcp/ip, Udp Protocol, Realizes The Network Transmission Of 16-bit Cd Audio Signal. Iii. Supporting Poe (ieee 802.3af) Power Supply Mode, Only One Network Cable Is Needed To Connect To The Poe Switch, So The Operation Is Simple And Convenient. Iv. Equipped With A Dc 24v Standby Power Interface, It Is Suitable For Power Supply When Power Demand Is Greater Than 10w Or For Non-poe Networks. V. Digital Power Amplifiers With Intelligent Gain Adjustment, Adaptive Power Supply, And Automatic Power Adjustment Are Always In The State Of Performance Optimization And Efficiency Maximization. Vi. Full-band, High-sensitivity Amplifier Unit With Abundant Power And High Fidelity. Vii. Compatible With Any Network Architecture Such As Router, Switch, Bridge Gateway, Modem, Internet, 2g, 3g, And 4g. Viii. Supporting The Broadcasting System To Upgrade The Terminal Firmware Remotely, Without Upgrading To The Terminal Locally, So As To Reduce The Work Intensity Of Maintenance. F. Forty-six (46) Units - Outdoor Column Speaker 20w I. Outdoor Waterproof Column Speaker, Streamlined Design. Ii. The Shell Is Made Of One-piece Thickened Aluminum Alloy, Which Can Effectively Reduce The Resonance Of The Cabinet When The Sound Pressure Is High, And The Surface Adopts Outdoor Powder Spraying To Prolong The Service Life. Iii. The Mesh Cover Is Made Of Aluminum Alloy, One-piece Stamping, And Covered With A High Acoustic Sponge, Further Improving The Waterproof Performance And Increasing The Service Life. Iv. Using Six 2.5-inch Full-range Speaker Units, Bearing High Power, Low Distortion, And Excellent Vocal Performance. V. Built-in High-performance 100v Audio Transformer, Which Can Reduce The Loss In The Circuit Due To Impedance. Vi. Using High-quality Wires, It Can Be Used At Full Load For A Long Time, With Good Anti-scald And Conductivity Capabilities. Vii. L-shaped Bracket Design, Convenient And Flexible Adjustment Scheduling, User-friendly Operation, And Installation Debugging. 3. One (1) Lot - Roughing-in Materials 4. One (1) Lot - Scope Of Works I. Device Installation And Termination Ii. Cable Testing And Tracing Iii. Technical Configuration, Testing, Commissioning, System Configuration, Training, System Design, And System Management. 5. One (1) Service - Network Design, Consultation (signed By Pece) And Permits 6. One (1) Service - Project Management Services 7. One (1) Service - Switch & Access Point Installation 8. One (1) Service - Network Configuration Services 9. One (1) Service - Training And Knowledge Transfer 10. One (1) Service - Scaling And Optimization (testing And Analysis By Fluke Systems) 11. One (1) Service - Temporary Facility (temfacil), Field Office 12. One (1) Service - Mobilization Cost 13. One (1) Service - Forwarding Cost 14. Two (2) Years - Warranty E.24 E-library Infrastructure 1. Twenty (20) Units – Desktop Computers A. Processor: Intel I5 Or Amd Ryzen 5 Processor (or Higher) B. Memory: 8 Gb Ddr4 Or Higher C. Form Factor: Tower D. Storage: At Least 500 Gb Ssd (or Higher) E. Graphics Processing Unit (gpu): 4g Gddr5 (or Higher) F. Display: At Least 23.8” Hd Led Display (or Higher) G. Peripherals: Power Cords, Keyboard & Optical Mouse H. Chassis: Usb Ports, Audio Port, Mic Port, Power Switch, Reset Switch I. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) J. Operating System (os): Windows 11 Or Higher K. Warranty: 1 Year Courier Or Carry-in L. Must Have 650va Ups 2. Twenty (20) Units – Desktop Computers Headphones A. Audio Specifications Must Have, Frequency Response: 20 Hz To 20,000 Hz (standard Range For Human Hearing), Impedance: 32 Ohms (standard For Most Headsets; Higher Impedance May Be Better For High-end Audio), Sensitivity: 90-120 Db (decibels) At 1 Mw For Sound Level, Driver Size: 30-50 Mm (larger Drivers Often Provide A Better Bass Response), Sound Output: Stereo Or 7.1 Surround Sound (for Gaming And Multimedia), Total Harmonic Distortion (thd): Less Than 1% (minimizes Audio Distortion), Noise-canceling: Active (anc) Or Passive, B. Microphone Specifications Must Have, Type: Omnidirectional Or Unidirectional, Frequency Response: 100 Hz To 10,000 Hz, Sensitivity: -38 Db ± 3 Db, Noise Cancellation: Active Or Passive Noise-canceling Microphone, Mute Function: Usually Included For Easy On/off Control, C. Connectivity Wired: 3.5 Mm Audio Jack, Usb (type-a Or Type-c) D. Controls Volume Control: On-ear Cup Or Inline Volume Adjustment, Playback Control: Some Models Allow Pause/play/skip For Media. 3. One (1) Lot - Roughing-ins Materials 4. One (1) Service - Project Management Services 5. One (1) Service - User's Training & Knowledge Transfer 6. One (1) Service - User Training 7. One (1) Service - Manpower Cost 8. One (1) Service - Mobilization Cost 9. One (1) Service- Forwarding Cost 10. One (1) - Temporary Facility (temfacil) 11. One (1) Service - Desktop Installation/software Setup And Configuration 12. One (1) Year - Support Warranty E.25 E-classroom, E-room Infrastructure And Smart Led Solar Powered Light 1. Twenty (20) Units - Smart Tv A. Screen Size: 65” B. Resolutions: 3840x2160, Picture Quality: 4, Brightness Detection C. Ultimate Dimming, Contrast Enhancer, Adaptive Sound D. Multi-device Experience, Hdmi At Least Two (2) Port, Bluetooth E. Usb At Least One (1) Port, Wireless Lan Built-in, F. Power-supply: Ac100-240v~ 50/60hz 2. Eight (8) Unit – Smart Led Solar Powered Light I. Independent Distributed Power Supply System Ii. Solar Powered W/ Smart Sensors Iii. High Quality Lithium Battery Iv. Input Voltage Ac 110~220v (+/-10%) V. Pole-mounted Installation Vi. Mounting: Ground Structured Support For Outdoor Smart Led Solar Powered Light 3. Eleven (11) Units - Interactive Smart Board A. Screen Size: 75” Or Higher I. Must Have Built-in System 1. Cpu Frequency 2.2 Ghz + 2.0 Ghz 2. Gpu Arm Mali-g52 Mp8 (8ee) 3. Operating System Android 11.0 4. Cpu Quad-core A73 + Quad-core A53 5. Ram 12 Gb (system: 8 Gb, Camera: 4 Gb) 6. Rom 64 Gb Ii. Must Support The Following Function 1. Operating System Of External Module Windows 7/8/10;android 2. Wifi Dual-band 2.4 G/5 G; Supports 802.11 A/b/g/n/ac Wireless Frequency Range 3. Wi-fi Hotspot Dual-band 2.4 G/5 G; Supports Enabling Hotspot And Wi-fi At The Same Time Iii. Lcd Panel Must Have The Following Features 1. Response Time 8ms 2. Panel Dimensions 75-inch To 98-inch 3. Backlight Dled 4. Aspect Ratio 16:9 5. Lifespan At Least 50,000 H 6. Refresh Rate 60 Hz 7. Static Contrast Va: 4000 (typ.); Ips: 1200 (typ.) Iv. Must Have The Camera Features 1. Pixel At Least 48 Mp 2. Auto Control, Auto Flip; Auto White Balance 3. Max. Resolution 3840 × 2160@30 Fps 4. Storage 8 Gb Emmc 5. Face Detection: Yes V. Must Have Device Ports 1. Light Sensor 1 2. Front Button 1 × Power Button (right Side) 3. Front Ports 1 × Usb 3.0 (left Side) 4. Network Port 1 × Rj-45 5. Wi-fi 1 × Wi-fi; 1 × Hotspot Vi. Must Support The Following Power Features 1. Power Requirements: 100v-240v, 50-60 Hz 2. Power Consumption (normal): ≤430w 3. Power Consumption (standby): ≤0.5w 4. Usb 3 × Usb 3.0; 1 × Micro Usb 5. Rs-232 1 × Rs-232 6. Video Input 1 × Hdmi In 7. Video Output 1 × Hdmi Out 8. Audio Output 1 × 3.5 Mm (line Out) Port 9. Irda 1 10. Microphone 8 Array 11. Type-c Port 1 × Type-c Vii. Must Have The Following Touchscreen Features 1. Touch Technology Type Infrared Touch Technology 2. Response Time < 10 Ms 3. Touch Points Supports 20 Touch Points And Drawing Up To 20 Lines 4. Valid Touch 2 Mm 5. Touch Accuracy ± 1 Mm 6. Writing Mode Finger + Pen (attaches Magnetically) 7. Touch Resolution 32767 × 32767 8. Number Of Multi-user Writing Points 10 Viii. Must Have The Following Speaker Features 1. Frequency 150 Hz–20 Khz 2. Power 15 W × 3 (max.) 3. Built-in Speaker 3 Ix. Must Have Fingerprint Features 1. Fingerprint Capacity 100 2. Fingerprint Resolution 160 × 160 3. Far 0.001% X. Microphone Must Have The Following Features 1. Pick-up Distance Far-field Sound Pickup: 6 M–8 M (19.69 Ft–26.25 Ft) 2. Number Of Microphones 8 3. Agc: Yes 4. Echo Cancellation: Yes 5. Polar Pattern: Omnidirectional 6. Intelligent Noise Filtering: Yes Xi. Must Have The Following Features 1. Power Supply 100–240 Vac, 50/60 Hz 2. Product Material Metal Casing 3. Protective Glass Anti-dazzle Tempered Glass With A Hardness Of 7 On The Mohs Scale 4. Installation - Wall Mount; Mobile Bracket 5. Standby Power Consumption ≤ 0.5 W 6. Energy Star (except 98-inch Model); Cb; Ce 4. Eleven (11) Units - Ups A. Must Have Capacity 1500va/900w B. Must Support Input Rated Voltage 220vac~240vac 110vac~120vac C. Must Support Voltage Range 140vac~290vac 81vac~145vac D. Must Have A Rated Frequency Range Of 50hz Or 60hz E. Must Have Output Voltage 220/230/240 Vac 110/120 Vac F. Must Have Ac Voltage Regulation (batt. Mode) ±10% G. Must Have Frequency Range (batt. Mode) 50hz Or60hz±1hz H. Must Transfer Time 2-6ms I. Must Support Battery Type & Number 12 V/9 Ah X 2 J. Must Charging Voltage 27.4v±1% K. Must Have Alarm: Battery Mode Sounding, Low Battery Sounding, Overload Sounding, And Fault Continuously Sounding L. Must Have Protection: Full Protection Overload, Discharge, And Overcharge Protection M. Must Operating Temperature 0°c ~ +40°c (+32°f ~ +104°f) 5. Biometric And Door Access With Connectivity (restricted Rooms And Offices Only) A. Eighty-six (86) Units - Fingerprint And Card Reader I. Must Have Rs-485 Protocol1 Ii. Must Support Mifare 13.56 Mhz Card Or Fingerprint Iii. Must Store Up To 3,000 Fingerprints Iv. Must Have Watchdog Function For Tamper Detection V. Must Have Audible And Visual Indicators Vi. Must Support Surface-mount Installation Vii. Must Support Unlock Mode Ic Card, Fingerprint, Combination Viii. Must Have Card Reader Format 13.56 Mhz Mifare Ix. Must Have Response Time 0.1s B. Eighty-six (86) Units - Access Controller I. Must Have Tcp/ip Communication. Ii. Must Support Communication Protocols Rs-485 And Wiegand. Iii. Must Support Storing 100,000 User And 500,000 Card-swiping Records. Iv. Must Support Multi-door Interlock, Multi-user Unlock, Aand Nti-passback. V. Must Support Remote Unlock. Vi. Must Support Reader Tamper Alarm, Intrusion Alarm, Unlocking Timeout Vii. Must Have An Alarm, Duress Alarm, Invalid Card Exceeding Threshold Alarm, And Incorrect Password Alarm. Viii. Must Support Built-in Rtc, Manual Time Fixing, And Automatic Time Fixing. Ix. Must Support Online Upgrades. X. Must Support A Watchdog Mechanism To Ensure The Operation Stability. C. Eighty-six (86) Units - Ups I. Must Have Capacity 1500va/900w Ii. Must Support Input Rated Voltage 220vac~240vac 110vac~120vac Iii. Must Support Voltage Range 140vac~290vac 81vac~145vac Iv. Must Have A Rated Frequency Range Of 50hz Or 60hz V. Must Have Output Voltage 220/230/240 Vac 110/120 Vac Vi. Must Have Ac Voltage Regulation (batt. Mode) ±10% Vii. Must Have Frequency Range (batt. Mode) 50hz Or60hz±1hz Viii. Must Transfer Time 2-6ms Ix. Must Support Battery Type & Number 12 V/9 Ah X 2 X. Must Charging Voltage 27.4v±1% Xi. Must Have Alarm: Battery Mode Sounding, Low Battery Sounding, Overload Sounding, And Fault Continuously Sounding Xii. Must Have Protection: Full Protection Overload, Discharge And Overcharge Protection Xiii. Must Operating Temperature 0°c ~ +40°c (+32°f ~ +104°f) D. Ninety-eight (98) Units - Electromagnetic Lock I. The Casing Must Made Of Aluminum Alloy Ii. Must Have The Following Functions: Signal Output Com/no/nc, Door Status Detection 1, Relay Iii. Must Have Tension Up To 280 Kg (617.29 Lb), Tensile Force Iv. Must Have Anti-corrosion Level Basic Protection E. Ninety-eight (98) Units - Bracket For Door I. Must Support Up To 280kg Magnetic Lock Ii. Must The Material: High Strength Aluminum Alloy Iii. Must Support Door Type: Wooden, Metal, Fire Door Iv. Must Support Open Way: 90°/180° F. Eight (8) Units - Card Enrollment Reader I. Must Be Equipped With The 32-bit High-speed Processor Ii. Must Have A Built-in Audible Beeper Iii. Must Support Read Format 13.56mhz 125khz Iv. Must Have Read Range 3cm-5cm (max.) V. Must Have Communication Interface Usb To Pc Vi. Must Have Power Supply 5v Dc/100ma Vii. Must Have Ce And Fcc Certificates G. Five Hundred (500) Pcs - Laminated Integrated Circuit (ic) Card I. Must Have Read/write Function Ii. Must Be Made Of Pvc Material Iii. Must Support Standard: Mifare S50, 13.56 Mhz Iv. Must Have Range: Approximately 10 Cm (3.94 In.) H. Accessories I. Eighty-six (86) Units - Infrared Exit Button 1. Must Have Plastic Or Stainless Steel Case 2. Must Support Working Temperature Is -30°c~+60°c Ii. Eighty-six (86) Units - Emergency Break Glass Button 1. Must Have Nc/no/com Ports 2. Must Support Working Temperature Is -20°c~+55°c I. One (1) Lot - Software Note: Stand-alone 1. Must Have Video Surveillance, Access Control, And Various Attendance Functions. 2. Must Built To Be Versatile, Provide Direct Access To The Web Client, And Feature P2p Linking, Real-time Monitoring, Video Playback, Event Center, Access Control And Attendance, 3. Must Have A Monitoring Screen That Can Be Viewed In Real-time On The Platform. Can Also View Snapshots Taken Of The Monitoring Screen, And Play Video Recordings. 4. Built To Work With Access Control Devices, It Can Be Used To Remotely Open And Close Doors, Access Videos From Cameras, And Remotely Configure Alarm Settings. 5. Works Together With Attendance Devices To Allow You To Manage Shifts, Handle Errors, Configure Settings For Business Trips And Leave Of Absence, And Generate Statistics On Attendance. 6. Access Control: Device Type Face Recognition Access Terminal (asi), Access Controller, (asc), Time & Attendance Terminal (asa), Number Of People 1000, Time Template 128, Time Period Up To 4, Holiday Plan Up To 16, Anti-passback Group Max. 2, First Card Unlock Record Max. 64, Multi Card Unlock Record Max. 64, Inter-door Lock Record Max. 64, Real-time Event Display Max. 100 J. One (1) Unit - Desktop Computer 1. Processor: Intel I5 Or Amd Ryzen5 Processor (or Higher) 2. Memory: 16 Gb Ddr4 Or Higher 3. Form Factor: Tower 4. Storage: At Least 500 Gb Ssd (or Higher) 5. Graphics Processing Unit (gpu): 4g Gddr5 (or Higher) 6. Display: At Least 23.8” Hd Led Display (or Higher) 7. Peripherals: Power Cords, Keyboard & Optical Mouse 8. Chassis: Usb Ports, Audio Port, Mic Port, Power Switch, Reset Switch 9. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) 10. Operating System (os): Windows 11 Pro Or Higher 11. Warranty: 1 Year Courier Or Carry-in 12. Must Have 1*1500va Ups 6. Thirty (30) Units - Biometric For Employees With Connectivity For Time-in And Timeout A. Thirty (30) Units - Biometric - Time & Attendance I. Must Support Up To 1.500 Fingerprints, Up To 100.000 Record,s And Up To 2.000 Cards (optional). Ii. Must Support Multi-languages. Iii. Must Have Communication: Tcp/ip, Usb-host, Wi-fi (optional). Iv. Must Have High Verification Speed. V. Must Have Professional Firmware And Platform. B. One (1) Lot - Management Software Note: Included In Hris And Payroll Management System C. One (1) Unit - Desktop Computer I. Processor: Intel I5 Or Amd Ryzen5 Processor (or Higher) Ii. Memory: 16 Gb Ddr4 Or Higher Iii. Form Factor: Tower Iv. Storage: At Least 500 Gb Ssd (or Higher) V. Graphics Processing Unit (gpu): 4g Gddr5 (or Higher) Vi. Display: At Least 23.8” Hd Led Display (or Higher) Vii. Peripherals: Power Cords, Keyboard & Optical Mouse Viii. Chassis: Usb Ports, Audio Port, Mic Port, Power Switch, Reset Switch Ix. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) X. Operating System (os): Windows 11 Or Higher Xi. Warranty: 1 Year Courier Or Carry-in Xii. Must Have 1*650va Ups 7. One (1) Site - Electrical Works Temporary Facility (temfacil) 8. One (1) Site - Structured Cabling (including External Cabling) / Roughing - In 9. One (1) Service - Smart Tv Installation 10. One (1) Service - Smartboard Installation, Setup, And Configuration 11. One (1) Site - Installation Components (biometric Installation, Setup, And Configuration) 12. One (1) Service - Project Management Services 13. One (1) Service - User's Training & Knowledge Transfer 14. One (1) Service - Manpower Cost 15. One (1) Service Mobilization Cost 16. One (1) Service - Forwarding Cost 17. One (1) Year - Extended Support Warranty E.26 Software And Network Laboratories 1. Twenty (20) Units - Desktop Computers A. Processor: Intel I5 Or Amd Ryzen5 Processor (or Higher) B. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) C. Operating System (os): Windows 11 Or Higher D. Memory: 16 Gb (or Higher) E. Storage: 500 Gb Ssd (or Higher) F. Display: 14” Display G. Graphic Card: Integrated Graphics H. Camera: 1080p Fhd Ir/rgb Hybrid I. Wireless: Wi-fi 6e Ax211 2x2, Bluetooth 5.1 Or Above J. Ethernet Port Or Usb K. Power Cord: At Least 45w L. Warranty: 1 Year Courier Or Carry-in 2. Four (4) Units - Interactive Smart Tv ( 65") A. Screen Size: 65” B. Resolutions: 3840x2160 C. Picture Quality: 4 D. Brightness Detection E. Ultimate Dimming F. Contrast Enhancer G. Adaptive Sound H. Multi-device Experience I. Hdmi At Least Two (2) Port J. Usb At Least One (1) Port K. Wireless Lan Built-in L. Bluetooth M. Power-supply: Ac100-240v~ 50/60hz 3. One (1) Unit - Interactive Smart Board A. Screen Size: 75” Or Higher I. Must Have Built-in System 1. Cpu Frequency 2.2 Ghz + 2.0 Ghz 2. Gpu Arm Mali-g52 Mp8 (8ee) 3. Operating System Android 11.0 4. Cpu Quad-core A73 + Quad-core A53 5. Ram 12 Gb (system: 8 Gb, Camera: 4 Gb) 6. Rom 64 Gb Ii. Must Support The Following Function 1. Operating System Of External Module Windows 7/8/10;android 2. Wifi Dual-band 2.4 G/5 G; Supports 802.11 A/b/g/n/ac Wireless Frequency Range 3. Wi-fi Hotspot Dual-band 2.4 G/5 G; Supports Enabling Hotspot And Wi-fi At The Same Time Iii. Lcd Panels Must Have The Following Features 1. Response Time 8ms 2. Panel Dimensions 75-inch To 98-inch 3. Backlight Dled 4. Aspect Ratio 16:9 5. Lifespan At Least 50,000 H 6. Refresh Rate 60 Hz 7. Static Contrast Va: 4000 (typ.); Ips: 1200 (typ.) Iv. Must Have The Camera Features 1. Pixel At Least 48 Mp 2. Auto Control, Auto Flip; Auto White Balance 3. Max. Resolution 3840 × 2160@30 Fps 4. Storage 8 Gb Emmc 5. Face Detection: Yes V. Must Have Device Ports 1. Light Sensor 1 2. Front Button 1 × Power Button (right Side) 3. Front Ports 1 × Usb 3.0 (left Side) 4. Network Port 1 × Rj-45 5. Wi-fi 1 × Wi-fi; 1 × Hotspot Vi. Must Support The Following Power Features 1. Power Requirements: 100v-240v, 50-60 Hz 2. Power Consumption (normal): ≤430w 3. Power Consumption (standby): ≤0.5w 4. Usb 3 × Usb 3.0; 1 × Micro Usb 5. Rs-232 1 × Rs-232 6. Video Input 1 × Hdmi In 7. Video Output 1 × Hdmi Out 8. Audio Output 1 × 3.5 Mm (line Out) Port 9. Irda 1 10. Microphone 8 Array 11. Type-c Port 1 × Type-c Vii. Must Have The Following Touchscreen Features 1. Touch Technology Type Infrared Touch Technology 2. Response Time < 10 Ms 3. Touch Points Supports 20 Touch Points And Drawing Up To 20 Lines 4. Valid Touch 2 Mm 5. Touch Accuracy ± 1 Mm 6. Writing Mode Finger + Pen (attaches Magnetically) 7. Touch Resolution 32767 × 32767 8. Number Of Multi-user Writing Points 10 Viii. Must Have The Following Speaker Features 1. Frequency 150 Hz–20 Khz 2. Power 15 W × 3 (max.) 3. Built-in Speaker 3 Ix. Must Have Fingerprint Features 1. Fingerprint Capacity 100 2. Fingerprint Resolution 160 × 160 3. Far 0.001% X. Microphone Must Have The Following Features 1. Pick-up Distance Far-field Sound Pickup: 6 M–8 M (19.69 Ft–26.25 Ft) 2. Number Of Microphones 8 3. Agc: Yes 4. Echo Cancellation: Yes 5. Polar Pattern: Omnidirectional 6. Intelligent Noise Filtering: Yes Xi. Must Have The Following Features 1. Power Supply 100–240 Vac, 50/60 Hz 2. Product Material Metal Casing 3. Protective Glass Anti-dazzle Tempered Glass With A Hardness Of 7 On The Mohs Scale 4. Installation - Wall Mount; Mobile Bracket 5. Standby Power Consumption ≤ 0.5 W 6. Energy Star (except 98-inch Model); Cb; Ce B. Ops I5 8+256 Win 10 C. Screen Sharingdongle 4. One (1) Unit - 1500va/900w Line-interactive Ups 5. One (1) Lot - Roughing-ins Materials 6. One (1) Service - Project Management 7. One (1) Service - Temporary Facility (temfacil) For 30 Days 8. One (1) Service - Smart Board Installation, Set Up, And Configuration 9. One (1) Service - Training And Knowledge Transfer 10. One (1) Service - Smart Tv Installation 11. One (1) Service - Desktop Installation/software Setup And Configuration 12. One (1) Service - Manpower Cost 13. One (1) Service - Mobilization Cost, Demobilization 14. One (1) Service - Forwarding Cost 15. One (1) Service - Cabling Works 16. One (1) Lot - Structured Cabling (including External Cabling) 17. One (1) Year - Support Warranty E.27 Smart Function Hall 1. Smart Function Hall (audio System) A. Six (6) Units - Active Speakers I. Power: 1300w Peak, 650w Rms Ii. Lf Driver: 12" Ferrite Woofer Iii. Hf Driver: 1" Neodymium Tweeter Iv. Frequency Range: 50hz - 20khz V. Maximum Spl: 127db Vi. Mounting Options: Suspension Points, Pole Socket, Universal Yoke Mount B. One (1) Unit - Digital Mixer With Ipad Controller I. Channels: 32 Input, 40 Mix Channels Ii. Inputs: 8 X Xlr, 8 X Xlr-1/4" Combo, 1 X Dual Rca Stereo Iii. Outputs: 2 X Xlr, 1 X Xlr (mono Sum), 6 X Xlr (mix Out) Iv. Effects: Flex Fx Multi-effects Processor, 4 Effects Slots V. Control: Touch-sensitive Motorized Faders, Daw Control C. One (1) Set - Control Room Monitor Speakers I. Driver: 6.5" Composite Cone Lf, 1.25" Silk Tweeter Hf Ii. Power: 130w Rms Iii. Frequency Response: 42hz - 20khz Iv. Maximum Spl: 104db D. Two (2) Units - Wireless Microphones With Stands I. Frequency Response: 50hz - 20khz Ii. Operating Range: 300 Ft Line-of-sight Iii. Battery Life: Up To 14 Hours E. Four (4) Units - Wired Microphones With Stands I. Frequency Response: 50hz - 15khz Ii. Max Spl: 94db Spl F. One (1) Unit - Rack Mount Server I. Cpu: Intel I7 12th Gen Ii. Ram: 32gb Iii. Storage: 1tb Sata, 500gb Ssd Iv. Graphics Cards: 4 G. One (1) Unit - Ptz Camera Ai Auto Tracking I. Resolution: Uhd 4k, 1080p Signal Format Ii. Zoom: 30x Optical, 16x Digital Iii. Connectivity: Ethernet, Hdmi, 3g-sdi H. One (1) Unit - Ptz Camera Controller With Lcd Screen I. Control: Ndi, Ip, And Serial Control Ii. Protocols: Visca, Pelco-p & D Iii. Compatibility: Sony, Newtek Iv. Display: Lcd Screen For Real-time Status I. One (1) Lot - Cabling And Installation Smart Function Hall 2. Smart Function Hall (indoor Video Wall) A. One (1) Lot - Led Panel I. Must Have 4.2x2.025m P0.9375 Indoor Led Screen Ii. Led Lamp Parameter: Color Configuration: Rgb 3in1, Color: Red, Green, Blue, Luminance: 990-1210 Mcd, 1980-2420 Mcd, 495-605 Mcd, Viewing Angle: 160º/160º, Wavelength: 625-630 Nm, 520-525 Nm, 465-470 Nm Iii. Must Have Led Module Parameter: Pixel Pitch(mm) 0.9375, Iv. Pixel Configuration Cob, Module Size(mm) W 300 H 168.75, Module Resolution(dots) W 320 H 180, Drive Ic Icn1069 V. Must Have Led Cabinet Parameter: Cabinet Size (mm) W 600 H 337.5, Cabinet Resolution (dots) W 640 H 360, Cabinet Pixels (dots) 230400, Cabinet Material Die Casting Aluminum, Cabinet Weight (kg) 4.8 Vi. Must Have Led Screen Parameter: Screen Size(m)w 4.2 W 2.025 H, Screen Resolution(dots)w 4480 W 2160 H, Cabinet Quantity(pc)w 7 W 6 H, Pixel Density(pixel/m2) 1137778, Brightness(cd/m2) 600, Brightness Adjusted 256 Grade By Software Or By Auto-optic Induced, Driving Method 1/46 Scan Display Color 439, 804, 651, 110, Viewing Distance (m) ≥0.9375m, View Angle Horizontal 160°; Vertical 160° Color Contrast Ratio 5000:1, Gray Grade 16bit, Refresh Frequency (hz) 3840, Protective Grade Ip43, Working Temperature(ºc) -30~+70, Stored Temperature (ºc) -40~+80, Operation Humidity(rh) 0-95%, Lifetime 100,000 Hrs Maintenance Front Side Working Voltage Ac110 / Ac220v±10% 47~63hz, Power Consumption Max: 800w/㎡ ; Ave:310w/㎡" B. One (1) Lot - Controller I. Must Have Three Kinds Of Led 4k Sending Cards: (1) − H_20xrj45 Sending Card Loads Up To 13,000,000 Pixels, (2) − H_16xrj45+2xfiber Sending Card Loads Up To 10,400,000 Pixels And Provides Two Opt Ports That Copy The Outputs On Ethernet Ports, (3) − H_4xfiber Sending Card Loads Up To 20,800,000 Pixels And Supports Three Working Modes, Including Independent, Copy And Backup. The Three Cards Mentioned Above Cannot Be Used Together To Load The Same Screen. Ii. Must Have Multi-capacity Configuration On A Single Card Slot: − 4x 2k×1k@60hz, − 2x 4k×1k@60hz, − 1x 4k×2k@60hz Iii. Must Have A Simple Screen Configuration Using A Single Card And Connector Iv. Must Have Online Status Monitoring Of All Input And Output Cards V. Must Have Hot-swappable Input And Output Cards Vi. Must Have An H_2xrj45 Ip Input Card That Supports Up To 512 Ip Camera Inputs And Input Mosaic. Vii. Must Have Auto Decryption Of Hdcp-encrypted Sources Viii. Must Have Decimal Frame Rates Supported Ix. Must Have Hdr10 And Hlg Processing X. Each Screen Can Have Its Own Output Resolution. Xi. Must-have Output Mosaic: Adopts The Frame Synchronization Technology, Which Ensures All The Output Connectors Output The Image Synchronously, And The Image Is Complete And Played Smoothly, Without Any Stuck, Frame Loss, Tearing, Or Piercing. Xii. Must Support Irregular Screen Configuration: Supports Irregular Rectangle Mosaic Without Any Limitations. Xiii. Must Have Input Source Grouping Management Xiv. Must Have Eye-saver Mode: Display The Image In A Warmer But Less Bright Way To Relieve Eye Strain. Xv. Lcd Bezel Compensation Xvi. Must Have Multi-layer Display: A Single Card Supports 16x 2k Layers, 8x Dl, Layers, Or 4x 4k Layers. All Layers Support Cross-connector Output And The Layer Quantity Is Not Reduced For Cross-connector Output. Xvii. Must Have High-definition Scrolling Text, Customize The Scrolling Text Content, Such As Slogans Or Notification Messages, And Set The Text Style, Scrolling Direction, And Speed. Xviii. Must Support Up To 2,000 Presets: Fade Effect And Seamless Switching Supported, Less Than 60ms Preset Switching Duration Xix. Must Have Scheduled Playback Of Preset Playlist, Set Whether To Add The Presets To Playlist, Which Is Ideal For Monitoring, Exhibitions, Presentations, And Other Applications. Xx. Must Have Osd Settings On A Single Screen And Adjustable, Osd Transparency Xxi. Must Have Bkg Settings, Bkg Images Do Not Occupy The Layer Resources. The Max Width And Height Of A Bkg Image Are Up To 15k And 8k Respectively. Xxii. Must Have Channel Logo Management: Set A Text Or Image Logo For Identifying The Input Source. Xxiii. Must Have Input Source Cropping And Renaming After Cropping, Crop Any Input Source Image And Form A New Input Source After Cropping. Xxiv. Must Have Hdr And 10-bit Video Processing, Allowing For A More Exquisite And Clear Image. Xxv. Must Have Color Adjustment: Output Connector Color And Screen Color Adjustable, Including Brightness, Contrast, Saturation, Hue, And Gamma. Xxvi. Must Have Xr Scenario Control Xxvii. Must Have Low Latency: Reduce The Latency From The Input Source To The Receiving Card To As Low As 1 Frame. Xxviii. Must Have Web Control: Real-time Response And 1000m/100m Self-adaptive Network Control, Allowing For Multi-user Collaboration. Xxix. Must Have Monitoring Of Inputs And Outputs On A Web Page Xxx. Must Support Firmware Updates On A Web Page Xxxi. Must Have Ark Visualized Management And Control Platform App Control On Pad Device. Xxxii. Must Have Self-test For Fault Detection Xxxiii. Must Have Auto-monitoring And Alarms: Supports Hardware Monitoring, Such As Fan Rotation Speed, Module Temperature And Voltage, And Running Status, And Sends Fault Alarms If Necessary. Xxxiv. Must Support An Optional Power Supply For Higher System Reliability. Xxxv. Must Have Backup Design − Backup Between Devices − Backup Between Led 4k Sending Cards. C. Accessories I. One (1) Unit - Vacuum Suction Ii. One (1) Unit - Structure/bracket 4.2x2.025m Iii. Nine (9) Units - Hdmi Cable 8k 10 Meters Iv. Six (6) Units - 1500va/900w Line Interactive Ups D. Three (3) Units - Desktop Computer I. Processor: Intel I5 Or Amd Ryzen5 Processor (or Higher) Ii. Microsoft Office: Microsoft Office Home And Student 2021 Or Microsoft Office 365 (1-year) Iii. Operating System (os): Windows 11 Pro Or Higher Iv. Memory: 16 Gb (or Higher) V. Storage: 500 Gb Ssd (or Higher) Vi. Display: 14” Display Vii. Graphic Card: Integrated Graphics Viii. Camera: 1080p Fhd Ir/rgb Hybrid Ix. Wireless: Wi-fi 6e Ax211 2x2, Bluetooth 5.1 Or Above X. Ethernet Port Or Usb Xi. Power Cord: At Least 45w Xii. Warranty: 1 Year Courier Or Carry-in 3. One (1) Service - Project Management Services 4. One (1) Service - User Acceptance Testing (uat) 5. One (1) Service - User Training And Knowledge Transfer 6. One (1) Service - Manpower Cost 7. One (1) Service - Mobilization Cost 8. One (1) Service - Forwarding Cost 9. One (1) Year- Support Warranty E.28 Econference Room With Video Conferencing 1. Six (6) Units - Interactive Smart Board A. Screen Size: 75” Or Higher I. Must Have Built-in System 1. Cpu Frequency 2.2 Ghz + 2.0 Ghz 2. Gpu Arm Mali-g52 Mp8 (8ee) 3. Operating System Android 11.0 4. Cpu Quad-core A73 + Quad-core A53 5. Ram 12 Gb (system: 8 Gb, Camera: 4 Gb) 6. Rom 64 Gb Ii. Must Support The Following Function 1. Operating System Of External Module Windows 7/8/10; Android 2. Wifi Dual-band 2.4 G/5 G; Supports 802.11 A/b/g/n/ac Wireless Frequency Range 3. Wi-fi Hotspot Dual-band 2.4 G/5 G; Supports Enabling Hotspot And Wi-fi At The Same Time Iii. Lcd Panels Must Have The Following Features 1. Response Time 8ms 2. Panel Dimensions 75-inch To 98-inch 3. Backlight Dled 4. Aspect Ratio 16:9 5. Lifespan At Least 50,000 H 6. Refresh Rate 60 Hz 7. Static Contrast Va: 4000 (typ.); Ips: 1200 (typ.) Iv. Must Have The Camera Features 1. Pixel At Least 48 Mp 2. Auto Control, Auto Flip; Auto White Balance 3. Max. Resolution 3840 × 2160@30 Fps 4. Storage 8 Gb Emmc 5. Face Detection: Yes V. Must Have Device Ports 1. Light Sensor 1 2. Front Button 1 × Power Button (right Side) 3. Front Ports 1 × Usb 3.0 (left Side) 4. Network Port 1 × Rj-45 5. Wi-fi 1 × Wi-fi; 1 × Hotspot Vi. Must Support The Following Power Features 1. Power Requirements: 100v-240v, 50-60 Hz 2. Power Consumption (normal): ≤430w 3. Power Consumption (standby): ≤0.5w 4. Usb 3 × Usb 3.0; 1 × Micro Usb 5. Rs-232 1 × Rs-232 6. Video Input 1 × Hdmi In 7. Video Output 1 × Hdmi Out 8. Audio Output 1 × 3.5 Mm (line Out) Port 9. Irda 1 10. Microphone 8 Array 11. Type-c Port 1 × Type-c Vii. Must Have The Following Touchscreen Features 1. Touch Technology Type Infrared Touch Technology 2. Response Time < 10 Ms 3. Touch Points Supports 20 Touch Points And Drawing Up To 20 Lines 4. Valid Touch 2 Mm 5. Touch Accuracy ± 1 Mm 6. Writing Mode Finger + Pen (attaches Magnetically) 7. Touch Resolution 32767 × 32767 8. Number Of Multi-user Writing Points 10 Viii. Must Have The Following Speaker Features 1. Frequency 150 Hz–20 Khz 2. Power 15 W × 3 (max.) 3. Built-in Speaker 3 Ix. Must Have Fingerprint Features 1. Fingerprint Capacity 100 2. Fingerprint Resolution 160 × 160 3. Far 0.001% X. Microphone Must Have The Following Features 1. Pick-up Distance Far-field Sound Pickup: 6 M–8 M (19.69 Ft–26.25 Ft) 2. Number Of Microphones 8 3. Agc: Yes 4. Echo Cancellation: Yes 5. Polar Pattern: Omnidirectional 6. Intelligent Noise Filtering: Yes Xi. Must Have The Following Features 1. Power Supply 100–240 Vac, 50/60 Hz 2. Product Material Metal Casing 3. Protective Glass Anti-dazzle Tempered Glass With A Hardness Of 7 On The Mohs Scale 4. Installation - Wall Mount; Mobile Bracket 5. Standby Power Consumption ≤ 0.5 W 6. Energy Star (except 98-inch Model); Cb; Ce B. Ops I5 8+256 Win 10 C. Screen Sharingdongle’ D. Must Have 6*1500va/900w Line-interactive Ups 2. Four (4) Lots - Microphones, Speakers And Accessories A. Four (4) Units - Full Digital Conference System Controller I. Microphone Capacity: Wired Microphone≤4096: Wireless Microphone≤300 Ii. Simultaneous Interpretation Channel: 63+1 Channels Iii. Frequency Response: 80~16khz Iv. Main Power: 100-120vac / 200-240vac By Switch V. Audio Input: Linein1: 775mvrms Balanced; 2 Output Phoenix Terminals: 775mvrms Balanced; Linein2: 775mvrms Unbalanced Vi. Audio Output: Lineout1: 1vrms Balanced; 16 Multi-function Output Phoenix Terminals: 1vrms Balanced; Lineout2: 1vrms Unbalanced Vii. Output Load >1kω Viii. Extension Port 1 For Connecting Conference System Extension Equipment Ix. Pc Network Port: 1 For Connect To The Computer X. Delegates Output Interface: 4 For Connecting Conference Speaking Units Xi. Rs-232 Interface: 2 Channels, 1 Channel For Camera Tracking, 1 Channel For Docking External Equipment Xii. Rs-485 Interface: 1 For Camera Tracking Xiii. Wired Microphone Connection Method Special Cable (6 Pins) Xiv. Rack Mountable B. Four (4) Units - Audio Processor, Afc Feedback Suppression Function I. The Panel Is Designed With Afc Touch Keys And Working Indicators. Ii. Equipped With 2 Network Ports For Connecting Wireless Ap And Communicating With The Conference Server; Connect To The Digital Conference Server Through Network Protocol To Realize Audio Data Transmission. Iii. With Automated Functions, Including Gain Sharing Type Auto-mixing And Gate Type Auto-mixing. Iv. Support Afc Feedback Suppression Function, Adopt Dual Notch + Frequency Shift Method, Automatically Grab The Howling Point, And Set The Notch Frequency, The Notch Filter Supports 12 Fixed Points + 12 Dynamic Points To Effectively Eliminate The Howling Function. V. With Automatic Gain Function, It Can Effectively Keep The Microphone Volume Within A Certain Dynamic Range. Vi. With The Microphone Voice Activation Function, Set The Tracking Threshold, And The Camera Tracking Function Can Be Realized When The Microphone Speech Reaches The Threshold. Vii. Working With The Digital Conference Server, With The Auto-mixing Function, It Can Support Up To 16 Wired Microphones And 8 Wireless Microphones At The Same Time. Viii. With 1 Xlr Balanced Output And 1 Rca Unbalanced Output. Ix. With 1 Extension Interface, Used To Connect The Extension Port Of The Digital Conference Server. X. With 1rs-232 Communication Interface (camera Tracking), Connected To The Central Controller Or The Camera Tracking Controller To Realize The Speech Camera Tracking Function. Xi. With 1 Rs-485 Communication Interface, Used To Connect Cameras To Achieve Camera Tracking. Xii. With 1 Rs-232 Communication Interface (speech Transcription), Used To Connect A Speech Transcription Server To Realize The Function Of Speech Transcription. Xiii. Simultaneous Turned-on Microphone: 16 Wired Mics + 8 Wireless Mics Xiv. Main Power Supply: 100-240ac/50-60hz Xv. Audio Output: Line Out 1: 1v Xlr Balanced Output ; Line Out 2: 1v Rca Unbalanced Output Xvi. Output Load: >1kω Xvii. Connection Method: Rj45 Network Port Xviii. Rack Mountable C. Four (4) Units - 5g Wifi Full Digital Conference - Chairman Unit I. Adopt A 48khz Sampling Rate, Clear And Bright Sound. Ii. Using Advanced Processing Chip Architecture And A Unique Processing Algorithm, The Microphone Power-on Connection Time Only Takes 5 Seconds. Iii. Support Intelligent Detection Of Faults, Prompting Users Of Ap Faults, Host Communication Faults, And Low Signal Strength. Iv. Support Charging Through Type-c Port, Support 18w Fast Charging, With Smart Indicator Status. V. Support Setting Ssid Function Through Ui. Vi. Support Multi-language Switching, And Uniformly Set Through Pc Software. Vii. The Chairman Unit Has A Speech Timing Function. When The Timing Speech Function Is Turned On, The Chairman Unit Is Not Restricted. Viii. With A Voice Control Function, The Microphone Can Be Turned On Intelligently. Support Adjusting The Sensitivity Of The Voice Control And Setting The Closing Time Through The Software. Ix. Support Sign-in Function, Set And Initiate Through Pc Software. X. Support Conference Voting Function, Five-key Voting, Three-key Voting Function, Flexible And Convenient. Xi. Adopt 128-bit Aes Encryption Technology, Support Wpa/wpa2 Wireless Security Technology, Prevent Eavesdropping And Unauthorized Access, And Provide Higher Confidentiality Of The Conference System. Xii. Using Wireless Transmission Technology, It Only Takes Very Little Time For The Venue Layout To Carry Out Activities. Xiii. The Chairman Has A Priority Function To Turn Off All Speaking Delegate Microphones. Xiv. Equipped With A 3.5mm Headphone Jack For Connecting An External Microphone. Xv. Built-in Lithium Battery, The Battery Capacity Supports 14 Hours Of Continuous Speech. D. Sixty-eight (68) Units - 5g Wifi Full Digital Conference - Delegate Unit I. Adopt A 48khz Sampling Rate, Clear And Bright Sound. Ii. Using Advanced Processing Chip Architecture And A Unique Processing Algorithm, The Microphone Power-on Connection Time Only Takes 5 Seconds. Iii. Support Intelligent Detection Of Faults, Prompting Users Of Ap Faults, Host Communication Faults, And Low Signal Strength. Iv. Support Charging Through Type-c Port, Support 18w Fast Charging, With Smart Indicator Status. V. Support Setting Ssid Function Through Ui. Vi. Support Multi-language Switching, And Uniformly Set Through Pc Software. Vii. Support Speech Timing And Timing Speech Functions, And The Delegate Unit Has The Function Of Applying For Speech. Viii. With A Voice Control Function, The Microphone Can Be Turned On Intelligently. Ix. Support Adjusting The Sensitivity Of The Voice Control And Setting The Closing Time Through The Software. X. Support Sign-in Function, Set And Initiate Through Pc Software. Xi. Support Conference Voting Function, Five-key Voting, Three-key Voting Function, Flexible And Convenient. Xii. Adopt 128-bit Aes Encryption Technology, Support Wpa/wpa2 Wireless Security Technology, Prevent Eavesdropping And Unauthorized Access, And Provide Higher Confidentiality Of The Conference System. Xiii. Using Wireless Transmission Technology, It Only Takes Very Little Time For The Venue Layout To Carry Out Activities. Xiv. The Delegate Unit Can Apply To Speak With The Approval Of The Chairman. Xv. Equipped With A 3.5mm Headphone Jack For Connecting An External Microphone. Xvi. Built-in Lithium Battery, The Battery Capacity Supports 14 Hours Of Continuous Speech. E. Seven (7) Units - Power Charger, With 10 Usb Charger Interfaces Support 18w Charge I. All Usb Ports Of The Charger Can Be Used Simultaneously For Batch Charging Of Devices. Ii. Use A Usb Cable, Connect One End To The Charger And The Other End To The Conference Unit; Support 18w Fast Charging. Iii. With Auto Circuit Protection, All Usb Ports Support Short-circuit Protection And Self-recovery Functions F. Four (4) Units - Ap Transmitter I. Comply With The Wi-fi 6 Protocol Standard (ieee 802.11ax), Backward Compatibility With 802.11a/b/g/n/ac/wave2, Support Mu-mimo, And Allow The Ap To Receive Data From Multiple Terminals At The Same Time. The Maximum Transmission Rate Of The Whole Machine Can Reach 1.601gbps, Effectively Providing Higher-performance Wireless Access Services In Terms Of Coverage, Access Density, And Traffic Throughput. Ii. Support Ofdma Spatial Multiplexing Technology And 1024 Qam Modulation And Demodulation Algorithm, Which Can Provide Faster Wireless Internet Access And Larger Wireless Coverage. Iii. Through The Virtual Wireless Access Point (virtual Ap) Technology, Up To 32 Essids Can Be Provided. Iv. Layer 2 Isolation Can Be Performed On The Subnets Using The Same Ssid Or Under The Same Vlan To Ensure User Data Security. V. Support Wpa3 Security Protocol. Vi. Support 80/160mhz High Bandwidth Frequency Band. Vii. Support Local Power Supply And Poe Remote Power Supply. Viii. It Is Suitable For Ceiling Mounting, Wall Mounting, And Desktop Installation. G. Eight (8) Units - Speaker I. Adopt 1 Mid-woofer And 2 Cone Tweeters. Ii. 12mm Plywood Housing, Lightweight, Wear-resistant Spray Paint Treatment, And Dust-proof Net Cotton Outside. Iii. The Frequency Divider In Precise Design Optimizes The Vocal Mf Performance H. Four (4) Units - Amplifier I. 1u Cabinet Design, Small In Size And Light In Weight. Ii. Adopt The Latest Class D Digital Amplifier Design, With Low Distortion And High Efficiency. Iii. Adopt Switched Power Supply Technology, With High Efficiency. Iv. Adopt A Smart Peak Clipper To Control The Power Module And Speaker System To Work In A Safe Range. V. Designed With Standard Xlr Input Interface And Link Output Interface. Vi. Support Soft Start To Prevent Absorbing Large Currents From The Power Grid During Startup And Interfering With Other Electrical Equipment. Vii. Smart Control Forced Heat Dissipation Design, Low Fan Noise, And High Heat Dissipation Efficiency. Viii. Support Overvoltage Protection, Undervoltage Protection, Overcurrent Protection, Dc Protection, Output Short Circuit Protection, Temperature Control, Fan, And So On. I. Eight (8) Units - Professional Loudspeaker Wall - Mounted Bracket I. Fixed Panel Size: 34×34mm (length×width) Ii. Cabinet Fixed Panel Size: 110mm Iii. Weight: 0.31kg 3. One (1) Lot - Roughing-ins Materials 4. Six (6) Lots - Cabling Works 5. Six (6) Lots - Structured Cabling (including External Cabling) 6. Three (3) Licenses - Video Conferencing System 7. One (1) Service - Project Management Services 8. One (1) Service - User Acceptance Testing (uat) 9. One (1) Service - User's Training & Knowledge Transfer 10. One (1) Service - Manpower Cost 11. One (1) Service - Mobilization Cost 12. One (1) Service - Forwarding Cost 13. One (1) Year - Warranty Iv. Mandatory Technical Requirements/qualifications A. Statement Of Accumulated Similar Completed Government And Private Contracts Within The Last Five (5) Years With A Total Contract Amount Of At Least Php 500,000,000.00 Or 50% Of The Abc. A. Contract Definition Must Be Supported By The Following Documents: I. Copy Of Contract Or Po; Ii. Certificate Of Completion And Acceptance B. The Software Provider (sp) Should Be In The Business Of Software Development For At Least Five (5) Years With At Least Five (5) Completed And Accepted Combined Network And Software Projects. C. The Sp Shall Have At Least One (1) Software Accredited By The Bureau Of Internal Revenue (bir) Either An Inventory System Or Pos System Or Accounting System. D. The Sp Should Have Delivered At Least (2) Government Projects Within The Past 3 Years. E. The Sp’s Technical Director(s) Such As Senior Project Manager, Senior System Project Manager, Senior Network Project Manager, Senior Infrastructure Project Manager Must Have A Project Management Experience Of At Least Five (5) Years. Attach Curriculum Vitae, Diploma, Any Government Id With Signature, Relevant Certification/s And Relevant Training/s, Seminar. F. The Sp Shall Be A Partner/distributor Of The Oem Of The Devices Which Has Been In The Market For At Least 3 Years. G. The Sp’s Program Director Must Have A Project Management Experience Of At Least Five (5) Years, With Itil Service Management Certification Or Training And Fifteen (15) Years Of Experience In Software Architecture - Development, Service Delivery Management, State-of-the-art Network Infrastructure, And Delivered Project(s) In At Least One Of The 500 Fortune Companies Or At Least One Of The Telecommunication Companies In The Philippines. Attach Curriculum Vitae, Diploma, Any Government Id With Signature, Relevant Certification/s And Relevant Training/s, Seminar. H. The Sp’s Software Architect Must Have A Devops Foundation Certification Of At Least Five (5) Years Of Experience. Attach Curriculum Vitae, Diploma, Any Government Id With Signature, Relevant Certification/s And Relevant Training/s, Seminar. I. The Sp’s Security Lead Must Be A Certified Information Systems Security Professional (isc)2 For At Least Ten (10) Years Of Experience And Certified Ethical Hacker (ceh) For At Least Ten (10) Years Of Experience. Attach Curriculum Vitae, Diploma, Any Government Id With Signature, Relevant Certification/s And Relevant Training/s, Seminar. J. The Delivery Period Of The Project Is Two Hundred Eighty (280) Days. V. Progress Billing The Project Milestones Are Identified And Aimed At Improving The Hard, Soft, And Infrastructure Of The Basc Organization Leading To The Following Output And Outcome: 15% : Upon Submission Of Signed Contract 25% : Submission And Acceptance Of Detailed Work Plan And Systems Design 29. University Information System 30. Learning Management System 31. Cashiering System 32. Human Resource Management System & Time Keeping System 33. Payroll Management System 34. Assets & Fleet Management System 35. Document Management System 36. Trouble Ticketing System 37. Queuing / Appointment System 38. Executive Information System 39. Campus Portal System 40. University Library System 41. Econference Room W/ Video Conferencing 42. Internet Connectivity 43. Campus Network System 44. Fiber Optics Works 45. Structured Cabling Works 46. It Security Operations Center & Network Operations Center 47. Campus Data Center Upgrade 48. Data Center Network Switches 49. Data Center Compute System & Data Center Block And File Storage System 50. Data Center Backup And Recovery System 51. Cloud Infrastructure 52. Ip-pabx System 53. Software & Networking Laboratories 54. E-classroom, E-room Infrastructure And Smart Led Solar Powered Light 55. E-library Infrastructure 56. Smart Function Hall 26.43% 1st Batch Hardware Completion Of Equipment Deliverables For The Following Components At Basc Facility 17. It Security Operations Center & Network Operations Center 18. Campus Data Center Upgrade 19. Data Center Network Switches 20. Data Center Compute System & Data Center Block And File Storage System 21. Data Center Backup And Recovery System 22. Ip-pabx System 23. Software & Networking Laboratories 24. E-classroom, E-room Infrastructure And Smart Led Solar Powered Light 25. E-library Infrastructure 26. Smart Function Hall 27. Campus Network System 28. Fiber Optics Works 29. Structured Cabling Works 30. Human Resource Management System & Time Keeping System 31. Document Management System 32. Queuing / Appointment System 1st Batch User Acceptance Testing (uat) Completion For The Following System Components At Basc Facility 8. Human Resource Management System & Time Keeping System 9. Payroll Management System 10. Assets & Fleet Management System 11. Document Management System 12. Trouble Ticketing System 13. Queuing / Appointment System 14. Campus Portal System 23.57% 2nd Batch Hardware Completion Of Equipment Deliverables For The Following Components At Basc Facility 4. Internet Connectivity 5. University Library System 6. Econference Room W/ Video Conferencing 2nd Batch User Acceptance Testing (uat) Completion For The Following System Components At Basc Facility 6. Cloud Infrastructure 7. University Information System 8. Learning Management System 9. Executive Information System 10. University Library System Hardware Installation, Configuration And Integration 8. Campus Network System 9. Structured Cabling Works 10. It Security Operations Center & Network Operations Center 11. Data Center Network Switches 12. Data Center Backup And Recovery System 13. Ip-pabx System 14. E-library Infrastructure Acceptance Of Volume Testing 14. University Information System 15. Learning Management System 16. Cashiering System 17. Human Resource Management System & Time Keeping System 18. Payroll Management System 19. Assets & Fleet Management System 20. Document Management System 21. Trouble Ticketing System 22. Queuing / Appointment System 23. Executive Information System 24. Campus Portal System 25. University Library System 26. Econference Room W/ Video Conferencing : Completion Of Training 19. University Information System 20. Learning Management System 21. Cashiering System 22. Human Resource Management System & Time Keeping System 23. Payroll Management System 24. Assets & Fleet Management System 25. Document Management System 26. Trouble Ticketing System 27. Queuing / Appointment System 28. Executive Information System 29. Campus Portal System 30. University Library System 31. Econference Room W/ Video Conferencing 32. Campus Network System 33. It Security Operations Center & Network Operations Center 34. Campus Data Center Upgrade 35. Data Center Backup And Recovery System 36. Smart Function Hall 10% : Project Acceptance And Turnover 29. University Information System 30. Learning Management System 31. Cashiering System 32. Human Resource Management System & Time Keeping System 33. Payroll Management System 34. Assets & Fleet Management System 35. Document Management System 36. Trouble Ticketing System 37. Queuing / Appointment System 38. Executive Information System 39. Campus Portal System 40. University Library System 41. Econference Room W/ Video Conferencing 42. Internet Connectivity 43. Campus Network System 44. Fiber Optics Works 45. Structured Cabling Works 46. It Security Operations Center & Network Operations Center 47. Campus Data Center Upgrade 48. Data Center Network Switches 49. Data Center Compute System & Data Center Block And File Storage System 50. Data Center Backup And Recovery System 51. Cloud Infrastructure 52. Ip-pabx System 53. Software & Networking Laboratories 54. E-classroom And E-room Infrastructure And Smart Led Solar Powered Light 55. E-library Infrastructure 56. Smart Function Hall Vi. Warranties And Guarantees A. Software – At Least 1-year License Coverage, Starts Upon The First Day Of Acceptance. B. Network And Hardware Support – At Least 1-year Warranty In Parts And Labor Upon Acceptance, Onsite 24x7x365. C. Db Services – At Least 1-year License Coverage, Starts Upon Delivery And Installation. D. Implementation Services – At Least 1 Year Of License Coverage With 1,000 Users. E. Technical Support – Local 24x7x365 Online/onsite Support For At Least 1 Year. F. Onsite Support – Within 8 Hours From Receipt Of The Notice, Spare Parts Ready If Necessary. G. Supply Of Spare Parts – Availability Of Parts Shall Be Within 72 Hours. H. Provision Of Service Units If The Repair Will Exceed 3 Days. I. Sp Shall Provide A Testing Facility For Functionality Demonstration. Vii. Training The Project Supports The Capacity Building For Top-level Managers, Trainers, Developers, Network/systems/database/security Administrators, Hardware Maintenance And Troubleshooting. Training For A Minimum Of 10 Persons Per Component/system For The Following Categories: A. 3 -top-level Management – Designed For The Basc Executives B. 10 - Trainers – Specifically For The Trainers Of The Basc To Ensure Continuous Training To End-users. C. 10 - Network/systems/database/security Administrators - Training Designed For Administrators To Ensure 24x7x365 Monitoring Of The Services As Well As Prompt Response As Needed. D. 10 - End-user Training Is Designed For The Users Of The System And/or Encoders. Viii. Manpower The Proposed Project Team Shall Be Composed Of Experts And Specialists As Indicated In The Table Below. The Roster Shall Include A Minimum Of 19 Distinct Physical Persons. There Shall Be No Overlapping Of Functions. In This Respect, The Persons’ Names And Functions Shall Be Explicitly Specified. However, The Sp Has The Option To Add More Personnel Depending On His Work Strategy. The Curriculum Vitae Shall Be Signed By The Person. They Will Closely Collaborate And Coordinate With The Project Management Team Of The Basc. Personnel Role / Qualification Min. No. Program Director Point Person For Issues And Concerns About The Contract And Deliverables. With Project Management Experience Of At Least Ten (10) Years, Cs/it/engineering Degree Or Equivalent. 1 Senior Project Manager With Project Management Experience Spanning Seven (7) Years And A Leadership Role, Also Have Experience Managing Teams Of Project Managers And Business Analysts. With Servicenow Certification For Certified System Administrator. 1 Senior System Project Manager With Project Management Experience Spanning Five (5) Years And A Leadership Role, Also Have Experience Managing Teams Of Project Managers And Developers. With A Itil Service Management Certification, Cs/it/engineering Degree Or Equivalent. 1 Senior Network Project Manager With At Least Seven (7) Years Of Experience In Planning, Implementing, And Maintaining It Networks. With A Network Cable Installer Certification And A Jablotron 100+ Alarm System Training Course Certification. With A Cs/it/engineering Degree Or Equivalent. 1 Senior Infrastructure Project Manager With At Least Seven (7) Years Of Experience In Taking Charge Of The Planning, Implementation, And Maintenance Of Infrastructure And Service Delivery Management. With A Microsoft Certified Professional Certification With A Cs/it/engineering Degree Or Equivalent. 1 Senior Project Manager For Peripherals With At Least Seven (7) Years Of Experience In Project Management With A Focus On It Networks, Infrastructure, And Peripherals (biometrics, Cctv, And Alarm Systems). With A Fiber Optic Preparation & Splicing And Jablotron 100+ Alarm System Training Course Certification With A Cs/it/engineering Degree Or Equivalent. 1 Business Analyst Person In Charge Of The Business And System Specifications With Experience In Systems Analysis And Design. With A Cs/it/engineering Degree Or Equivalent. 4 Enterprise/ Software Architect Person In Charge Of System Architecture And Structural Design With At Least Ten (10) Years Of Experience In Software Architecture And Development. Microsoft Office Sharepoint Server 2007, Application Development Certification Of At Least Three (3) Years Or Openspan Certified Developer Certification Of At Least Ten (10) Years. With A Cs/it/engineering Degree Or Equivalent. 2 Systems Analyst/ Developers Person In Charge Of The System Specifications With At Least Three (3) Years Of Experience In Systems Analysis And Design. Basic React Programming Certification Or With A Cs/it/engineering Degree Or Equivalent. 9 Senior Database Administrator Person In Charge Of Installing, Administering, Maintaining, And Performance Tuning Databases With At Least Seven (7) Years Of Experience In Rdbms. With A Cs/it/engineering Degree Or Equivalent. 2 Senior Security Analyst Person In Charge Of Securing And Administering Smart Campus Security System With At Least Seven (7) Years Of Experience In It Security. With A Cs/it/engineering Degree Or Equivalent. Certified Information Systems Security Professional (isc) And Certified Ethical Hacker (ceh). 1 Quality Assurance Manager With Quality Assurance Experience Spanning Three (3) Years And A Leadership Role, Also Have Experience Managing Teams Of Project Managers And Developers. With A Cs/it/engineering Degree Or Equivalent. 4 Operations Support Lead With Operations Support Experience Spanning Three (3) Years Of The Same Role In A Customer Service, Help Desk, Technical Support, And/or Call Center. With A Bachelor's Degree Or Equivalent. 1 Help Desk And Technical Support With Operations Support Experience Spanning Two (2) Years Of The Same Role In A Help Desk, Technical Support, And/or Call Center. With A Bachelor's Degree Or Equivalent. 5 Senior Trainers With Trainer Or Teaching Experience Spanning Five (5) Years Of The Same Role In Education Institutions. With A Bachelor's Degree Or Equivalent. 2 Total (minimum Physical Count) 36 Section Viii. Checklist Of Technical And Financial Documents Notes On The Checklist Of Technical And Financial Documents The Prescribed Documents In The Checklist Are Mandatory To Be Submitted In The Bid, But Shall Be Subject To The Following: A. Gppb Resolution No. 09-2020 On The Efficient Procurement Measures During A State Of Calamity Or Other Similar Issuances That Shall Allow The Use Of Alternate Documents In Lieu Of The Mandated Requirements; Or B. Any Subsequent Gppb Issuances Adjusting The Documentary Requirements After The Effectivity Of The Adoption Of The Pbds. The Bac Shall Be Checking The Submitted Documents Of Each Bidder Against This Checklist To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion Pursuant To Section 30 Of The 2016 Revised Irr Of Ra No. 9184. Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages);or ⬜ (b) Registration Certificate From Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives Or Its Equivalent Document, And ⬜ (c) Mayor’s Or Business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas; And ⬜ (d) Tax Clearance Per E.o. No. 398, S. 2005, As Finally Reviewed And Approved By The Bureau Of Internal Revenue (bir). Technical Documents ⬜ (f) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (g) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ (h) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And ⬜ (i) Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And ⬜ (j) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (k) The Supplier’s Audited Financial Statements, Showing, Among Others, The Supplier’s Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; And ⬜ (l) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc); Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents ⬜ (m) If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Other Documentary Requirements Under Ra No. 9184 (as Applicable) ⬜ (n) [for Foreign Bidders Claiming By Reason Of Their Country’s Extension Of Reciprocal Rights To Filipinos] Certification From The Relevant Government Office Of Their Country Stating That Filipinos Are Allowed To Participate In Government Procurement Activities For The Same Item Or Product. ⬜ (o) Certification From The Dti If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity. 25 Financial Component Envelope ⬜ (a) Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (b) Original Of Duly Signed And Accomplished Price Schedule(s). Bid Form Date: ____________ Project Identification No. 2025-01g To: Bulacan Agricultural State College Brgy. Pinaod, San Ildefonso, Bulacan 3010 Gentlemen And/or Ladies: Having Examined The Bidding Documents Including Bid Bulletin Numbers______ [insert Numbers], The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Offer To Supply, Delivery, And Installation Of Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hubin Conformity With The Said Bidding Documents For The Sum Of __________________________________________________________(php____________)[total Bid Amount In Words And Figures] Or Such Other Sums As May Be Ascertained In Accordance With The Schedule Of Prices Attached Herewith And Made Part Of This Bid. We Undertake, If Our Bid Is Accepted, To Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements. If Our Bid Is Accepted, We Undertake To Provide A Performance Security In The Form, Amounts, And Within The Times Specified In The Bidding Documents. We Agree To Abide By This Bid For The Bid Validity Period Specified In The Bidding Documents Provisions And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period. Commissions Or Gratuities, If Any, Paid Or To Be Paid By Us To Agents Relating To This Bid, And To Contract Execution If We Are Awarded The Contract, Are Listed Below: Name And Address Of Agent Amount And Currency Purpose Of Commission Or Gratuity (if None, State “none”) Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And Your Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Bid You May Receive. We Certify/confirm That We Comply With The Eligibility Requirements As Per The Bidding Documents. We Likewise Certify/confirm That The Undersigned, [for Sole Proprietorships, Insert: As The Owner And Sole Proprietor Or Authorized Representative Of Name Of Bidder, Has The Full Power And Authority To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract, On The Latter’s Behalf For The Name Of Project Of The Name Of The Procuring Entity] [for Partnerships, Corporations, Cooperatives, Or Joint Ventures, Insert: Is Granted Full Power And Authority By The Name Of Bidder, To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract On The Latter’s Behalf For Name Of Project Of The Name Of The Procuring Entity]. We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Attached Schedule Of Prices, Shall Be A Ground For The Rejection Of Our Bid. Dated This ________________ Day Of ________________ 2022. [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of _______________________ Price Schedule Name Of Bidder ____. Invitation To Bid Number 2025-01g Page _____ Of______. 1 2 3 4 5 6 7 8 9 10 Item Description Country Of Origin Quantity Unit Price Exw Per Item Transportation And Insurance And All Other Costs Incidental To Delivery, Per Item Sales And Other Taxes Payable If Contract Is Awarded, Per Item Cost Of Incidental Services, If Applicable, Per Item Total Price, Per Unit (col 5+6+7+8) Total Price Delivered Final Destination (col 9) X (col 4) 1 Grand Total (in Words) (in Figures) [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of _________________________ [bidder’s Letterhead] Name Of The Procuring Entity : Bulacan Agricultural State College Project: 2025-01g: Supply, Delivery, And Installation Of Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hub Location Of The Project : San Ildefonso, Bulacan List Of All Ongoing Government & Private Contracts Including Contracts Awarded But Not Yet Started Business Name : Business Address :______________________________________________________________________ Name Of Contract/ Project Cost A. Owner’s Name B. Address C. Telephone Nos. Nature Of Work Bidder’s Role A. Date Awarded B. Date Started C. Date Of Completion % Of Accomplishment Value Of Outstanding Works / Undelivered Portion Description % Planned Actual Government Private Note: This Statement Shall Be Supported With: Total Cost 1 Notice Of Award (for Government Projects) 2 Notice To Proceed (for Government Projects) 3 Contract Submitted By : (printed Name & Signature) Designation : Date : [bidder’s Letterhead] Name Of The Procuring Entity : Bulacan Agricultural State College Project: 2025-01g: Supply, Delivery, And Installation Of Digital Harvest: Transforming Bulacan Agricultural State College Into A Digital Innovation Hub Statement Of Single Largest Completed Contracts (slcc) In The Last Five (5) Years Business Name : Business Address : Name Of Contract A. Owner Name B. Address C. Telephone Nos. Nature Of Work Bidder’s Role A. Amount At Award B. Amount At Completion C. Duration A. Date Awarded B. Contract Effectivity C. Date Completed Description % Government Private Attached Herewith Are The Following Documents: Contract Agreement, Notice Of Award, Notice To Proceed, Official Receipt/invoice, Certificate Of Final Inspection, Certificate Of Good Performance And Certificate Of Acceptance, As Evidences In Support Of The Foregoing Information. Submitted By : (printed Name & Signature) Designation : ____________________________________________ Contract Agreement Form This Agreement Made The _____ Day Of __________ 20_____ Between [name Of Procuring Entity] Of The Philippines (hereinafter Called “the Entity”) Of The One Part And [name Of Supplier] Of [city And Country Of Supplier] (hereinafter Called “the Supplier”) Of The Other Part: Whereas The Entity Invited Bids For Certain Goods And Ancillary Services, Viz., [brief Description Of Goods And Services] And Has Accepted A Bid By The Supplier For The Supply Of Those Goods And Services In The Sum Of [contract Price In Words And Figures] (hereinafter Called “the Contract Price”). Now This Agreement Witnesseth As Follows: 1. In This Agreement Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Referred To. 2. The Following Documents Shall Be Deemed To Form And Be Read And Construed As Part Of This Agreement, Viz.: (a) The Supplier’s Bid, Including The Technical And Financial Proposals, And All Other Documents/statements Submitted (e.g. Bidder’s Response To Clarifications On The Bid), Including Corrections To The Bid Resulting From The Procuring Entity’s Bid Evaluation; (b) The Schedule Of Requirements; (c) The Technical Specifications; (d) The General Conditions Of Contract; (e) The Special Conditions Of Contract; (f) The Performance Security; And (g) The Entity’s Notice Of Award. 3. In Consideration Of The Payments To Be Made By The Entity To The Supplier As Hereinafter Mentioned, The Supplier Hereby Covenants With The Entity To Provide The Goods And Services And To Remedy Defects Therein In Conformity In All Respects With The Provisions Of The Contract 4. The Entity Hereby Covenants To Pay The Supplier In Consideration Of The Provision Of The Goods And Services And The Remedying Of Defects Therein, The Contract Price Or Such Other Sum As May Become Payable Under The Provisions Of The Contract At The Time And In The Manner Prescribed By The Contract. In Witness Whereof The Parties Hereto Have Caused This Agreement To Be Executed In Accordance With The Laws Of The Republic Of The Philippines On The Day And Year First Above Written. Signed, Sealed, Delivered By The (for The Entity) Signed, Sealed, Delivered By The (for The Supplier) Omnibus Sworn Statement Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ________ And His/her Community Tax Certificate No. _______ Issued On ____ At ______. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ * This Form Will Not Apply For Wb Funded Project Bid Securing Declaration Form Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: [insert Name And Address Of The Procuring Entity] I/we , The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. [insert Name Of Bidder’s Authorized Representative] [insert Signatory’s Legal Capacity] Affiant Financial Documents For Eligibility Check Year 20 1 Total Assets 2 Current Assets 3 Total Liabilities 4 Current Liabilities 5 Net Worth (1-3) 6 Net Working Capital (2-4) The Net Financial Contracting Capacity (nfcc) Based On The Above Data Is Computed As Follows: Nfcc = [(current Assets – Current Liabilities) (15)] Minus Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Ongoing Contracts Including Awarded Contracts Yet To Be Started Coinciding With The Contract To Be Bid. The Values Of The Domestic Bidder’s Current Assets And Current Liabilities Shall Be Based On The Latest Audited Financial Statements Submitted To The Bir. Nfcc = Php Submitted By: Name Of Bidder Signature Of Authorized Representative Over Printed Name Date:
Closing Date7 Feb 2025
Tender AmountPHP 1 Billion (USD 17.1 Million)
Municipality Of Mapanas, Northern Samar Tender
Civil And Construction...+1Road Construction
Philippines
Details: Description Bidding Documents Procurement Of Infrastructure Projects Name Of Project: Rehabilitation Of Farm-to-market Road At Brgy. E. Laodenio Barangay E. Laodenio, Mapanas Northern Samar Contract Reference No. 2025-01-06 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 7 Section Iii. Bid Data Sheet 35 Section Iv. General Conditions Of Contract 38 Section V. Special Conditions Of Contract 70 Section Vi. Specifications 72 Section Vii. Drawings 75 Section Viii. Bill Of Quantities Error! Bookmark Not Defined. Section Ix. Bidding Forms 77 Section X. Foreign-assisted Projects Error! Bookmark Not Defined. Section I. Invitation To Bid Bid Notice Abstract Invitation To Bid (itb) Republic Of The Philippines Province Of Northern Samar Municipality Of Mapanas Invitation To Bid For Project: Rehabilitation Of Farm-to-market Road, Brgy. E. Laodenio, Mapanas, Northern Samar The Lgu- Mapanas, Northern Samar, Through The Lgsf-sbdp Of Fy 2024 Intends To Apply The Sum Of Four Million Nine Hundred Ninety Nine Thousand Seven Hundred Seventy Nine Pesos 12/100 Only (p4,999,779.12) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For : Rehabilitation Of Farm-to-market Road, Brgy. E. Laodenio, Mapanas, Northern Samar Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Lgu- Mapanas, Northern Samar Now Invites Bids For The Following Description Of Works To Be Procured: Item No. Scope Of Work Quantity Unit Rehabilitation Of Farm-to-market Road, Brgy. E. Laodenio, Mapanas, Northern Samar B.5 Project Billboard/sign Board 1.00 Each B.7(2) Occupational Safety And Health Program 1.00 Is B.9 Mobilization/demobilization 1.00 Is Part C Earthworks 101(3)a.2 Removal Of Existing Pcc Pavement, 0.2m Thk, Pccp (for Reblocking At Intermittent Section) 1409.00 Sq.m. 102(2)b Surplus Common Excavation 420.00 Cu.m. 105(1) Subgrade Preparation (common Material) 1680.00 Sq.m. Part D Subbase And Base Course 200(1) Aggregate Subbase Course 267.50 Cu.m. 201(1) Aggregate Base Course 336.00 Cu.m. Part E Surface Courses 311(1)a.2 Pcc Pavement (plain) Conventional Method, 200mm Thk. 1400.00 Sq.m. Completion Of The Works Is Required 90 Calendar Days. Bidders Should Have Completed, Within Ten (10) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. Section Ii. Instructions To Bidders. 2. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From Lgu- Bac Mapanas, Northern Samar And Inspect The Bidding Documents At The Address Given Below From January 3-20, 2025, 8:00 A.m. To 5:00 Pm. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of P5,000.00. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later That The Submission Of Their Bids. 5. The Lgu- Mapana, Northern Samar Will Hold A Pre-bid Conference On January 10, 2025 At 10:00 A.m. At Executive Conference, 2nd Floor Of New Municipal Bldg. Mapanas, Northern Samar, Which Shall Be Open Only To All Interested Parties Who Have Purchased The Bidding Documents. 6. Bids Must Be Delivered To The Address Below On Or Before 9:00 A.m. Of January 21, 2025 At Bac Office, @ Municipal Planning & Development Office (mpdo), Mapanas, Northern Samar. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bids Will Be Opened In The Presence Of The Bidders’ Authorized Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. The Bidder May Request That The Bid Documents Be Sent To Them By Mail Or Courier, And For This, The Bidder Shall Pay The Amount In Philippine Peso To Cover The Cost Of Mail Or Courier Delivery. The Fee For Obtaining A Copy Of The Bid Documents And The Cost Of Mail Or Courier Shall Be Paid By The Bidder Thru S Cashier’s Check Or Manager’s Check Issued In Favor Of The Municipality Of Mapanas. 7. The Lgu- Mapanas, Northern Samar Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 8. For Further Information, Please Refer To: Reno C. Salazar Bac Secretary Mapanas, Northern Samar Mobile # 09459852914 Ma. Teresa L. Minguez Bac Chairperson Mapanas, Northern Samar Mobile # 09778033758 Section Ii. Instructions To Bidders 1. The Bids Must Be Delivered On Or Before January 15, 2025 At 9:00 A.m And Failure To Submit The Bid Proposal May Ground For Disqualification Of The Bid. 2. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Lgu- Mapanas, Northern Samar Now Invites Bids For The Following Description Of Works To Be Procured: Item No. Scope Of Work Quantity Unit Rehabilitation Of Farm-to-market Road, Brgy. E. Laodenio, Mapanas, Northern Samar B.5 Project Billboard/sign Board 1.00 Each B.7(2) Occupational Safety And Health Program 1.00 Is B.9 Mobilization/demobilization 1.00 Is Part C Earthworks 101(3)a.2 Removal Of Existing Pcc Pavement, 0.2m Thk, Pccp (for Reblocking At Intermittent Section) 1409.00 Sq.m. 102(2)b Surplus Common Excavation 420.00 Cu.m. 105(1) Subgrade Preparation (common Material) 1680.00 Sq.m. Part D Subbase And Base Course 200(1) Aggregate Subbase Course 267.50 Cu.m. 201(1) Aggregate Base Course 336.00 Cu.m. Part E Surface Courses 311(1)a.2 Pcc Pavement (plain) Conventional Method, 200mm Thk. 1400.00 Sq.m. Completion Of The Works Is Required 90 Calendar Days. Bidders Should Have Completed, Within Ten (10) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 2. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 3. Interested Bidders May Obtain Further Information From Lgu- Bac Mapanas, Northern Samar And Inspect The Bidding Documents At The Address Given Below From January 3-20, 2025, 8:00 A.m. To 5:00 Pm. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of P5,000.00. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later That The Submission Of Their Bids. 4. The Lgu- Mapanas, Northern Samar Will Hold A Pre-bid Conference On January 10, 2025 At 10:00 A.m. At Executive Conference, 2nd Floor Of New Municipal Bldg. Mapanas, Northern Samar, Which Shall Be Open Only To All Interested Parties Who Have Purchased The Bidding Documents. 5. Bids Must Be Delivered To The Address Below On Or Before 9:00 A.m. Of January 21, 2025 At Bac Office, Mapanas, Northern Samar. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bids Will Be Opened In The Presence Of The Bidders’ Authorized Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. The Bidder May Request That The Bid Documents Be Sent To Them By Mail Or Courier, And For This, The Bidder Shall Pay The Amount In Philippine Peso To Cover The Cost Of Mail Or Courier Delivery. The Fee For Obtaining A Copy Of The Bid Documents And The Cost Of Mail Or Courier Shall Be Paid By The Bidder Thru S Cashier’s Check Or Manager’s Check Issued In Favor Of The Municipality Of Mapanas. 6. The Lgu- Mapanas, Northern Samar Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 7. For Further Information, Please Refer To: Reno C. Salazar Bac Secretary Mapanas, Northern Samar Mobile # 09459852914 Ma. Teresa L. Minguez Bac Chairperson Mapanas N. Samar Mobile # 09778033758 Table Of Contents A. General 11 1. Scope Of Bid 11 2. Source Of Funds 11 3. Corrupt, Fraudulent, Collusive, And Coercive Practices 11 4. Conflict Of Interest 12 5. Eligible Bidders 14 6. Bidder’s Responsibilities 15 7. Origin Of Goods And Services 17 8. Subcontracts 17 B. Contents Of Bidding Documents 17 9. Pre-bid Conference 17 10. Clarification And Amendment Of Bidding Documents 18 C. Preparation Of Bids 18 11. Language Of Bids 18 12. Documents Comprising The Bid: Eligibility And Technical Components 18 13. Documents Comprising The Bid: Financial Component 21 14. Alternative Bids 21 15. Bid Prices 22 16. Bid Currencies 22 17. Bid Validity 23 18. Bid Security 23 19. Format And Signing Of Bids 25 20. Sealing And Marking Of Bids 26 D. Submission And Opening Of Bids 26 21. Deadline For Submission Of Bids 26 22. Late Bids 26 23. Modification And Withdrawal Of Bids 27 24. Opening And Preliminary Examination Of Bids 27 E. Evaluation And Comparison Of Bids 28 25. Process To Be Confidential 28 26. Clarification Of Bids 29 27. Detailed Evaluation And Comparison Of Bids 29 28. Post Qualification 30 29. Reservation Clause 31 F. Award Of Contract 32 30. Contract Award 32 31. Signing Of The Contract 33 32. Performance Security 33 33. Notice To Proceed 34 A. General 1. Scope Of Bid 1.1. The Procuring Entity As Defined In The Bds, Invites Bids For The Construction Of Works, As Described In Section Vi. Specifications. The Name And Identification Number Of The Contract Is Provided In The Bds. 1.2. The Successful Bidder Will Be Expected To Complete The Works By The Intended Completion Date Specified In Scc Clause 1.16. 2. Source Of Funds The Procuring Entity Has A Budget Or Has Applied For Or Received Funds From The Funding Source Named In The Bds, And In The Amount Indicated In The Bds. It Intends To Apply Part Of The Funds Received For The Project, As Defined In The Bds, To Cover Eligible Payments Under The Contract For The Works. 3. Corrupt, Fraudulent, Collusive, And Coercive Practices 3.1. Unless Otherwise Specified In The Bds, The Procuring Entity, As Well As Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. In Pursuance Of This Policy, The Funding Source: (a) Defines, For Purposes Of This Provision, The Terms Set Forth Below As Follows: (i) "corrupt Practice" Means Behavior On The Part Of Officials In The Public Or Private Sectors By Which They Improperly And Unlawfully Enrich Themselves, Others, Or Induce Others To Do So, By Misusing The Position In Which They Are Placed, And Includes The Offering, Giving, Receiving, Or Soliciting Of Anything Of Value To Influence The Action Of Any Such Official In The Procurement Process Or In Contract Execution; Entering, On Behalf Of The Procuring Entity, Into Any Contract Or Transaction Manifestly And Grossly Disadvantageous To The Same, Whether Or Not The Public Officer Profited Or Will Profit Thereby, And Similar Acts As Provided In Republic Act 3019; (ii) "fraudulent Practice" Means A Misrepresentation Of Facts In Order To Influence A Procurement Process Or The Execution Of A Contract To The Detriment Of The Procuring Entity, And Includes Collusive Practices Among Bidders (prior To Or After Bid Submission) Designed To Establish Bid Prices At Artificial, Non-competitive Levels And To Deprive The Procuring Entity Of The Benefits Of Free And Open Competition; (iii) “collusive Practices” Means A Scheme Or Arrangement Between Two Or More Bidders, With Or Without The Knowledge Of The Procuring Entity, Designed To Establish Bid Prices At Artificial, Non-competitive Levels; And (iv) “coercive Practices” Means Harming Or Threatening To Harm, Directly Or Indirectly, Persons, Or Their Property To Influence Their Participation In A Procurement Process, Or Affect The Execution Of A Contract; (v) “obstructive Practice” Is (aa) Deliberately Destroying, Falsifying, Altering Or Concealing Of Evidence Material To An Administrative Proceedings Or Investigation Or Making False Statements To Investigators In Order To Materially Impede An Administrative Proceedings Or Investigation Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Into Allegations Of A Corrupt, Fraudulent, Coercive Or Collusive Practice; And/or Threatening, Harassing Or Intimidating Any Party To Prevent It From Disclosing Its Knowledge Of Matters Relevant To The Administrative Proceedings Or Investigation Or From Pursuing Such Proceedings Or Investigation; Or (bb) Acts Intended To Materially Impede The Exercise Of The Inspection And Audit Rights Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Herein. (b) Will Reject A Proposal For Award If It Determines That The Bidder Recommended For Award Has Engaged In Corrupt Or Fraudulent Practices In Competing For The Contract; And (c) Will Declare A Firm Ineligible, Either Indefinitely Or For A Stated Period Of Time, To Be Awarded Contract Funded By The Funding Source If It At Any Time Determines That The Firm Has Engaged In Corrupt Or Fraudulent Practices In Competing Or, Or In Executing, A Contract Funded By The Funding Source. 3.2. Further, The Procuring Entity Will Seek To Impose The Maximum Civil, Administrative, And/or Criminal Penalties Available Under The Applicable Laws On Individuals And Organizations Deemed To Be Involved In Any Of The Practices Mentioned In Itb Clause 3.1(a). 3.3. Furthermore, The Funding Source And The Procuring Entity Reserve The Right To Inspect And Audit Records And Accounts Of A Contractor In The Bidding For And Performance Of A Contract Themselves Or Through Independent Auditors As Reflected In The Gcc Clause 34. 4. Conflict Of Interest 4.1. All Bidders Found To Have Conflicting Interests Shall Be Disqualified To Participate In The Procurement At Hand, Without Prejudice To The Imposition Of Appropriate Administrative, Civil, And Criminal Sanctions. A Bidder May Be Considered To Have Conflicting Interests With Another Bidder In Any Of The Events Described In Paragraphs (a) Through (c) And A General Conflict Of Interest In Any Of The Circumstances Set Out In Paragraphs (d) Through (g) Below: (a) A Bidder Has Controlling Shareholders In Common With Another Bidder; (b) A Bidder Receives Or Has Received Any Direct Or Indirect Subsidy From Any Other Bidder; (c) A Bidder Has The Same Legal Representative As That Of Another Bidder For Purposes Of This Bid; (d) A Bidder Has A Relationship, Directly Or Through Third Parties, That Puts Them In A Position To Have Access To Information About Or Influence On The Bid Of Another Bidder Or Influence The Decisions Of The Procuring Entity Regarding This Bidding Process. This Will Include A Firm Or An Organization Who Lends, Or Temporarily Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement For Or Implementation Of The Project If The Personnel Would Be Involved In Any Capacity On The Same Project; (e) A Bidder Submits More Than One Bid In This Bidding Process. However, This Does Not Limit The Participation Of Subcontractors In More Than One Bid; (f) A Bidder Who Participated As A Consultant In The Preparation Of The Design Or Technical Specifications Of The Goods And Related Services That Are The Subject Of The Bid; Or (g) A Bidder Who Lends, Or Temporary Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement For Or Implementation Of The Project, If The Personnel Would Be Involved In Any Capacity On The Same Project. 4.2. In Accordance With Section 47 Of The Irr Of Ra 9184, All Bidding Documents Shall Be Accompanied By A Sworn Affidavit Of The Bidder That It Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), Members Of The Technical Working Group (twg), Members Of The Bac Secretariat, The Head Of The Project Management Office (pmo) Or The End-user Unit, And The Project Consultants, By Consanguinity Or Affinity Up To The Third Civil Degree. On The Part Of The Bidder, This Clause Shall Apply To The Following Persons: (a) If The Bidder Is An Individual Or A Sole Proprietorship, To The Bidder Himself; (b) If The Bidder Is A Partnership, To All Its Officers And Members; (c) If The Bidder Is A Corporation, To All Its Officers, Directors, And Controlling Stockholders; And (d) If The Bidder Is A Joint Venture (jv), The Provisions Of Items (a), (b), Or (c) Of This Clause Shall Correspondingly Apply To Each Of The Members Of The Said Jv, As May Be Appropriate. Relationship Of The Nature Described Above Or Failure To Comply With This Clause Will Result In The Automatic Disqualification Of A Bidder. 5. Eligible Bidders 5.1. Unless Otherwise Indicated In The Bds, The Following Persons Shall Be Eligible To Participate In This Bidding: (a) Duly Licensed Filipino Citizens/sole Proprietorships; (b) Partnerships Duly Organized Under The Laws Of The Philippines And Of Which At Least Seventy Five Percent (75%) Of The Interest Belongs To Citizens Of The Philippines; (c) Corporations Duly Organized Under The Laws Of The Philippines, And Of Which At Least Seventy Five Percent (75%) Of The Outstanding Capital Stock Belongs To Citizens Of The Philippines; (d) Cooperatives Duly Organized Under The Laws Of The Philippines, And Of Which At Least Seventy Five Percent (75%) Of The Interest Belongs To Citizens Of The Philippines; And (e) Persons/entities Forming Themselves Into A Jv, I.e., A Group Of Two (2) Or More Persons/entities That Intend To Be Jointly And Severally Responsible Or Liable For A Particular Contract: Provided, However, That, In Accordance With Letter Of Instructions No. 630, Filipino Ownership Or Interest Of The Joint Venture Concerned Shall Be At Least Seventy Five Percent (75%): Provided, Further, That Joint Ventures In Which Filipino Ownership Or Interest Is Less Than Seventy Five Percent (75%) May Be Eligible Where The Structures To Be Built Require The Application Of Techniques And/or Technologies Which Are Not Adequately Possessed By A Person/entity Meeting The Seventy Five Percent (75%) Filipino Ownership Requirement: Provided, Finally, That In The Latter Case, Filipino Ownership Or Interest Shall Not Be Less Than Twenty Five Percent (25%). For This Purpose Filipino Ownership Or Interest Shall Be Based On The Contributions Of Each Of The Members Of The Joint Venture As Specified In Their Jva. 5.2. The Procuring Entity May Also Invite Foreign Bidders When Provided For Under Any Treaty Or International Or Executive Agreement As Specified In The Bds. 5.3. Government Corporate Entities May Be Eligible To Participate Only If They Can Establish That They (a) Are Legally And Financially Autonomous, (b) Operate Under Commercial Law, And (c) Are Not Dependent Agencies Of The Gop Or The Procuring Entity. 5.4. (a) Unless Otherwise Provided In The Bds, The Bidder Must Have Completed, Within Ten (10) Years From The Submission Of Bids, A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted To Current Prices Using The National Statistics Office Consumer Price Index. (b) For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bds. For This Purpose, Contracts Similar To The Project Shall Be Those Described In Thebds, And Completed Within The Period Stated In The Invitation To Bid And Itb Clause 12.1(a)(iii). 5.5. The Bidder Must Submit A Computation Of Its Net Financial Contracting Capacity (nfcc) Or A Commitment From A Universal Or Commercial Bank To Extend A Credit Line In Its Favor If Awarded The Contract For This Project (clc). The Nfcc, Computed Using The Following Formula, Must Be At Least Equal To The Abc To Be Bid: Nfcc = [(current Assets Minus Current Liabilities) (k)] Minus The Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Ongoing Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project. Where: K = 10 For A Contract Duration Of One Year Or Less, 15 For A Contract Duration Of More Than One Year Up To Two Years, And 20 For A Contract Duration Of More Than Two Years. The Clc Must Be At Least Equal To Ten Percent (10%) Of The Abc For This Project. If Issued By A Foreign Bank, It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank. In The Case Of Local Government Units (lgus), The Bidder May Also Submit Clc From Other Banks Certified By The Bangko Sentral Ng Pilipinas (bsp) As Authorized To Issue Such Financial Instrument. 6. Bidder’s Responsibilities 6.1. The Bidder Or Its Duly Authorized Representative Shall Submit A Sworn Statement In The Form Prescribed In Section Ix. Bidding Forms As Required In Itb Clause 12.1(b)(iii). 6.2. The Bidder Is Responsible For The Following: (a) Having Taken Steps To Carefully Examine All Of The Bidding Documents; (b) Having Acknowledged All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; (c) Having Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; (d) Having Complied With Its Responsibility To Inquire Or Secure Supplemental/bid Bulletin/s As Provided Under Itb Clause 10.3. (e) Ensuring That It Is Not “blacklisted” Or Barred From Bidding By The Gop Or Any Of Its Agencies, Offices, Corporations, Or Lgus, Including Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Gppb; (f) Ensuring That Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; (g) Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative/s To Verify All The Documents Submitted; (h) Ensuring That The Signatory Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary And/or To Represent The Bidder In The Bidding, With The Duly Notarized Secretary’s Certificate Attesting To Such Fact, If The Bidder Is A Corporation, Partnership, Cooperative, Or Joint Venture; (i) Complying With The Disclosure Provision Under Section 47 Of The Act In Relation To Other Provisions Of Republic Act 3019; And (j) Complying With Existing Labor Laws And Standards, If Applicable. Failure To Observe Any Of The Above Responsibilities Shall Be At The Risk Of The Bidder Concerned. 6.3. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contract Works And The Conditions For This Project And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 6.4. It Shall Be The Sole Responsibility Of The Prospective Bidder To Determine And To Satisfy Itself By Such Means As It Considers Necessary Or Desirable As To All Matters Pertaining To This Project, Including: (a) The Location And The Nature Of The Contract, Project, Or Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work. 6.5. The Procuring Entity Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Or Conclusions By The Prospective Or Eligible Bidder Out Of The Data Furnished By The Procuring Entity. 6.6. Before Submitting Their Bids, The Bidders Are Deemed To Have Become Familiar With All Existing Laws, Decrees, Ordinances, Acts And Regulations Of The Philippines Which May Affect The Contract In Any Way. 6.7. The Bidder Shall Bear All Costs Associated With The Preparation And Submission Of His Bid, And The Procuring Entity Will In No Case Be Responsible Or Liable For Those Costs, Regardless Of The Conduct Or Outcome Of The Bidding Process. 6.8. Bidders Should Note That The Procuring Entity Will Only Accept Bids Only From Those That Have Paid The Nonrefundable Fee For The Bidding Documents At The Office Indicated In The Invitation To Bid. 7. Origin Of Goods And Services There Is No Restriction On The Origin Of Goods, Or Contracting Of Works Or Services Other Than Those Prohibited By A Decision Of The United Nations Security Council Taken Under Chapter Vii Of The Charter Of The United Nations. 8. Subcontracts 8.1. Unless Otherwise Specified In The Bds, The Bidder May Subcontract Portions Of The Works To An Extent As May Be Approved By The Procuring Entity And Stated In The Bds. However, Subcontracting Of Any Portion Shall Not Relieve The Bidder From Any Liability Or Obligation That May Arise From The Contract For This Project. 8.2. Subcontractors Must Submit The Documentary Requirements Under Itb Clause 12 And Comply With The Eligibility Criteria Specified In The Bds. In The Event That Any Subcontractor Is Found By The Procuring Entity To Be Ineligible, The Subcontracting Of Such Portion Of The Works Shall Be Disallowed. 8.3. The Bidder May Identify The Subcontractor To Whom A Portion Of The Works Will Be Subcontracted At Any Stage Of The Bidding Process Or During Contract Implementation. If The Bidder Opts To Disclose The Name Of The Subcontractor During Bid Submission, The Bidder Shall Include The Required Documents As Part Of The Technical Component Of Its Bid. B. Contents Of Bidding Documents 9. Pre-bid Conference 9.1. (a) If So Specified In The Bds, A Pre-bid Conference Shall Be Held At The Venue And On The Date Indicated Therein, To Clarify And Address The Bidders’ Questions On The Technical And Financial Components Of This Project. (b) The Pre-bid Conference Shall Be Held At Least Twelve (12) Calendar Days Before The Deadline For The Submission Of And Receipt Of Bids. If The Procuring Entity Determines That, By Reason Of The Method, Nature, Or Complexity Of The Contract To Be Bid, Or When International Participation Will Be More Advantageous To The Gop, A Longer Period For The Preparation Of Bids Is Necessary, The Pre-bid Conference Shall Be Held At Least Thirty (30) Calendar Days Before The Deadline For The Submission And Receipt Of Bids, As Specified In The Bds. 9.2. Bidders Are Encouraged To Attend The Pre-bid Conference To Ensure That They Fully Understand The Procuring Entity’s Requirements. Non-attendance Of The Bidder Will In No Way Prejudice Its Bid; However, The Bidder Is Expected To Know The Changes And/or Amendments To The Bidding Documents As Recorded In The Minutes Of The Pre-bid Conference And The Supplemental/bid Bulletin. 9.3. Any Statement Made At The Pre-bid Conference Shall Not Modify The Terms Of The Bidding Documents Unless Such Statement Is Specifically Identified In Writing As An Amendment Thereto And Issued As A Supplemental/bid Bulletin. 10. Clarification And Amendment Of Bidding Documents 10.1. Bidders Who Have Purchased The Bidding Documents May Request For Clarification(s) On Any Part Of The Bidding Documents Or For An Interpretation. Such A Request Must Be In Writing And Submitted To The Procuring Entity At The Address Indicated In The Bds At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10.2. Supplemental/bid Bulletins May Be Issued Upon The Procuring Entity’s Initiative For Purposes Of Clarifying Or Modifying Any Provision Of The Bidding Documents Not Later Than Seven (7) Calendar Days Before The Deadline For The Submission And Receipt Of Bids. Any Modification To The Bidding Documents Shall Be Identified As An Amendment. 10.3. Any Supplemental/bid Bulletin Issued By The Bac Shall Also Be Posted On The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity Concerned, If Available. Unless, Otherwise Provided In The Bds, It Shall Be The Responsibility Of All Bidders Who Secure The Bidding Documents To Inquire And Secure Supplemental/bid Bulletins That May Be Issued By The Bac. However, Bidders Who Have Submitted Bids Before The Issuance Of The Supplemental/bid Bulletin Must Be Informed And Allowed To Modify Or Withdraw Their Bids In Accordance With Itb Clause 23. C. Preparation Of Bids 11. Language Of Bids The Bid, As Well As All Correspondence And Documents Relating To The Bid Exchanged By The Bidder And The Procuring Entity, Shall Be Written In English. Supporting Documents And Printed Literature Furnished By The Bidder May Be In Another Language Provided They Are Accompanied By An Accurate Translation In English Certified By The Appropriate Embassy Or Consulate In The Philippines, In Which Case The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 12. Documents Comprising The Bid: Eligibility And Technical Components 12.1. Unless Otherwise Indicated In The Bds, The First Envelope Shall Contain The Following Eligibility And Technical Documents: (a) Eligibility Documents – Class "a" Documents: (i) Registration Certificate From The Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives, Or Any Proof Of Such Registration As Stated In The Bds; (ii) Mayor’s Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located; (iii) Statement Of All Its Ongoing And Completed Government And Private Contracts Within Ten (10) Years From The Submission Of Bids, Including Contracts Awarded But Not Yet Started, If Any. The Statement Shall Include, For Each Contract, The Following: (iii.1) Name Of The Contract; (iii.2) Date Of The Contract; (iii.3) Contract Duration; (iii.4) Owner’s Name And Address; (iii.5) Nature Of Work; (iii.6) Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation; (iii.7) Total Contract Value At Award; (iii.8) Date Of Completion Or Estimated Completion Time; (iii.9) Total Contract Value At Completion, If Applicable; (iii.10) Percentages Of Planned And Actual Accomplishments, If Applicable; (iii.11) Value Of Outstanding Works, If Applicable; (iii.12) The Statement Shall Be Supported By The Notices Of Award And/or Notices To Proceed Issued By The Owners; And (iii.13) The Statement Shall Be Supported By The Constructors Performance Evaluation System (cpes) Rating Sheets, And/or Certificates Of Completion And Owner’s Acceptance, If Applicable; (iv) Unless Otherwise Provided In The Bds, Valid Philippine Contractors Accreditation Board (pcab) License And Registration For The Type And Cost Of The Contract For This Project; (v) Audited Financial Statements, Showing, Among Others, The Prospective Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; (vi) Nfcc Computation Or Clc In Accordance With Itb Clause 5.5; And Class "b" Document: (vii) If Applicable, Valid Joint Venture Agreement (jva) Or, In Lieu Thereof, Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful Shall Be Included In The Bid. (b) Technical Documents – (i) Bid Security As Prescribed In Itb Clause 18. If The Bidder Opts To Submit The Bid Security In The Form Of: (i.1) A Bank Draft/guarantee Or An Irrevocable Letter Of Credit Issued By A Foreign Bank, It Shall Be Accompanied By A Confirmation From A Universal Or Commercial Bank; Or (i.2) A Surety Bond Accompanied By A Certification Coming From An Authorized Insurance Commission That A Surety Or Insurance Company Is Authorized To Issue Such Instrument; (ii) Project Requirements, Which Shall Include The Following: (ii.1) Organizational Chart For The Contract To Be Bid; (ii.2) List Of Contractor’s Personnel (viz, Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; And (ii.3) List Of Contractor’s Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project; And (iii) Sworn Statement In Accordance With Section 25.2(b)(iv) Of The Irr Of Ra 9184 And Using The Form Prescribed In Section Ix. Bidding Forms. 13. Documents Comprising The Bid: Financial Component 13.1. Unless Otherwise Stated In The Bds, The Financial Component Of The Bid Shall Contain The Following: (a) Financial Bid Form In Accordance With The Form Prescribed In Section Ix. Bidding Forms; And (b) Any Other Document Related To The Financial Component Of The Bid As Stated In The Bds. 13.2. (a) Unless Indicated In The Bds, All Bids That Exceed The Abc Shall Not Be Accepted. (b) Unless Otherwise Indicated In The Bds, For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Following Conditions Are Met: (i) Bidding Documents Are Obtainable Free Of Charge On A Freely Accessible Website. If Payment Of Bidding Documents Is Required By The Procuring Entity, Payment Could Be Made Upon The Submission Of Bids. (ii) The Procuring Entity Has Procedures In Place To Ensure That The Abc Is Based On Recent Estimates Made By The Engineer Or The Responsible Unit Of The Procuring Entity And That The Estimates Are Based On Adequate Detailed Engineering (in The Case Of Works) And Reflect The Quality, Supervision And Risk And Inflationary Factors, As Well As Prevailing Market Prices, Associated With The Types Of Works Or Goods To Be Procured. (iii) The Procuring Entity Has Trained Cost Estimators On Estimating Prices And Analyzing Bid Variances. In The Case Of Infrastructure Projects, The Procuring Entity Must Also Have Trained Quantity Surveyors. (iv) The Procuring Entity Has Established A System To Monitor And Report Bid Prices Relative To Abc And Engineer’s/procuring Entity’s Estimate. (v) The Procuring Entity Has Established A Monitoring And Evaluation System For Contract Implementation To Provide A Feedback On Actual Total Costs Of Goods And Works. 14. Alternative Bids 14.1. Alternative Bids Shall Be Rejected. For This Purpose, Alternative Bid Is An Offer Made By A Bidder In Addition Or As A Substitute To Its Original Bid Which May Be Included As Part Of Its Original Bid Or Submitted Separately Therewith For Purposes Of Bidding. A Bid With Options Is Considered An Alternative Bid Regardless Of Whether Said Bid Proposal Is Contained In A Single Envelope Or Submitted In Two (2) Or More Separate Bid Envelopes. 14.2. Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 14.3. Each Bidder Shall Submit Only One Bid, Either Individually Or As A Partner In A Jv. A Bidder Who Submits Or Participates In More Than One Bid (other Than As A Subcontractor If A Subcontractor Is Permitted To Participate In More Than One Bid) Will Cause All The Proposals With The Bidder’s Participation To Be Disqualified. This Shall Be Without Prejudice To Any Applicable Criminal, Civil And Administrative Penalties That May Be Imposed Upon The Persons And Entities Concerned. 15. Bid Prices 15.1. The Contract Shall Be For The Whole Works, As Described In Itb Clause 1.1, Based On The Priced Bill Of Quantities Submitted By The Bidder. 15.2. The Bidder Shall Fill In Rates And Prices For All Items Of The Works Described In The Bill Of Quantities. Bids Not Addressing Or Providing All Of The Required Items In The Bidding Documents Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A "0" (zero) For The Said Item Would Mean That It Is Being Offered For Free To The Government. 15.3. All Duties, Taxes, And Other Levies Payable By The Contractor Under The Contract, Or For Any Other Cause, Prior To The Deadline For Submission Of Bids, Shall Be Included In The Rates, Prices, And Total Bid Price Submitted By The Bidder. 15.4. All Bid Prices For The Given Scope Of Work In The Contract As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Specified In Gcc Clause 48. Price Escalation May Be Allowed In Extraordinary Circumstances As May Be Determined By The National Economic And Development Authority In Accordance With The Civil Code Of The Philippines, And Upon The Recommendation Of The Procuring Entity. Furthermore, In Cases Where The Cost Of The Awarded Contract Is Affected By Any Applicable New Laws, Ordinances, Regulations, Or Other Acts Of The Gop, Promulgated After The Date Of Bid Opening, A Contract Price Adjustment Shall Be Made Or Appropriate Relief Shall Be Applied On A No Loss-no Gain Basis. 16. Bid Currencies 16.1. All Bid Prices Shall Be Quoted In Philippine Pesos Unless Otherwise Provided In The Bds. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate Prevailing On The Day Of The Bid Opening. 16.2. If So Allowed In Accordance With Itb Clause 16.1, The Procuring Entity For Purposes Of Bid Evaluation And Comparing The Bid Prices Will Convert The Amounts In Various Currencies In Which The Bid Price Is Expressed To Philippine Pesos At The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 16.3. Unless Otherwise Specified In The Bds, Payment Of The Contract Price Shall Be Made In Philippine Pesos. 17. Bid Validity 17.1. Bids Shall Remain Valid For The Period Specified In The Bds Which Shall Not Exceed One Hundred Twenty (120) Calendar Days From The Date Of The Opening Of Bids. 17.2. In Exceptional Circumstances, Prior To The Expiration Of The Bid Validity Period, The Procuring Entity May Request Bidders To Extend The Period Of Validity Of Their Bids. The Request And The Responses Shall Be Made In Writing. The Bid Security Described In Itb Clause 18 Should Also Be Extended Corresponding To The Extension Of The Bid Validity Period At The Least. A Bidder May Refuse The Request Without Forfeiting Its Bid Security, But His Bid Shall No Longer Be Considered For Further Evaluation And Award. A Bidder Granting The Request Shall Not Be Required Or Permitted To Modify Its Bid. 18. Bid Security 18.1. The Bid Security In The Amount Stated In The Bds Shall Be Equal To The Percentage Of The Abc In Accordance With The Following Schedule: Form Of Bid Security Amount Of Bid Security (equal To Percentage Of The Abc) (a) Cash Or Cashier’s/manager’s Check Issued By A Universal Or Commercial Bank. Two Percent (2%) (b) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank. (c) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security; And/or Five Percent (5%) (d) Any Combination Of The Foregoing. Proportionate To Share Of Form With Respect To Total Amount Of Security For Biddings Conducted By Local Government Units, The Bidder May Also Submit Bid Securities In The Form Of Cashier’s/manager’s Check, Bank Draft/guarantee, Or Irrevocable Letter Of Credit From Other Banks Certified By The Bsp As Authorized To Issue Such Financial Statement. 18.2. The Bid Security Should Be Valid For The Period Specified In The Bds. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 18.3. No Bid Securities Shall Be Returned To Bidders After The Opening Of Bids And Before Contract Signing, Except To Those That Failed Or Declared As Post-disqualified, Upon Submission Of A Written Waiver Of Their Right To File A Motion For Reconsideration And/or Protest. Without Prejudice On Its Forfeiture, Bid Securities Shall Be Returned Only After The Bidder With The Lowest Calculated Responsive Bid Has Signed The Contract And Furnished The Performance Security, But In No Case Later Than The Expiration Of The Bid Security Validity Period Indicated In Itb Clause 18.2. 18.4. Upon Signing And Execution Of The Contract, Pursuant To Itb Clause 31, And The Posting Of The Performance Security, Pursuant To Itb Clause 32, The Successful Bidder’s Bid Security Will Be Discharged, But In No Case Later Than The Bid Security Validity Period As Indicated In Itb Clause 18.2. 18.5. The Bid Security May Be Forfeited: (a) If A Bidder: (i) Withdraws Its Bid During The Period Of Bid Validity Specified In Itb Clause 17; (ii) Does Not Accept The Correction Of Errors Pursuant To Itb Clause 27.3(b); (iii) Fails To Submit The Requirements Within The Prescribed Period, Or A Finding Against Their Veracity, As Stated In Itb Clause 28.2; (iv) Submission Of Eligibility Requirements Containing False Information Or Falsified Documents; (v) Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding; (vi) Allowing The Use Of One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding; (vii) Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid; (viii) Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time; (ix) Refusal To Clarify Or Validate In Writing Its Bid During Post-qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification; (x) Any Documented Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor; (xi) Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared Successful; Or (xii) All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons. (b) If The Successful Bidder: (i) Fails To Sign The Contract In Accordance With Itb Clause 31; (ii) Fails To Furnish Performance Security In Accordance With Itb Clause 32. 19. Format And Signing Of Bids 19.1. Bidders Shall Submit Their Bids Through Their Duly Authorized Representative Using The Appropriate Forms Provided In Section Ix. Bidding Forms On Or Before The Deadline Specified In The Itb Clause 21 In Two (2) Separate Sealed Bid Envelopes, And Which Shall Be Submitted Simultaneously. The First Shall Contain The Technical Component Of The Bid, Including The Eligibility Requirements Under Itb Clause 12.1, And The Second Shall Contain The Financial Component Of The Bid. 19.2. Forms As Mentioned In Itb Clause 19.1 Must Be Completed Without Any Alterations To Their Format, And No Substitute Form Shall Be Accepted. All Blank Spaces Shall Be Filled In With The Information Requested. 19.3. The Bidder Shall Prepare An Original Of The First And Second Envelopes As Described In Itb Clauses 12 And 13. In Addition, The Bidder Shall Submit Copies Of The First And Second Envelopes. In The Event Of Any Discrepancy Between The Original And The Copies, The Original Shall Prevail. 19.4. The Bid, Except For Unamended Printed Literature, Shall Be Signed, And Each And Every Page Thereof Shall Be Initialed, By The Duly Authorized Representative/s Of The Bidder. 19.5. Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By The Duly Authorized Representative/s Of The Bidder. 20. Sealing And Marking Of Bids 20.1. Bidders Shall Enclose Their Original Eligibility And Technical Documents Described In Itb Clause 12, In One Sealed Envelope Marked “original - Technical Component”, And The Original Of Their Financial Component In Another Sealed Envelope Marked “original - Financial Component”, Sealing Them All In An Outer Envelope Marked “original Bid”. 20.2. Each Copy Of The First And Second Envelopes Shall Be Similarly Sealed Duly Marking The Inner Envelopes As “copy No. ___ - Technical Component” And “copy No. ___ – Financial Component” And The Outer Envelope As “copy No. ___”, Respectively. These Envelopes Containing The Original And The Copies Shall Then Be Enclosed In One Single Envelope. 20.3. The Original And The Number Of Copies Of The Bid As Indicated In The Bds Shall Be Typed Or Written In Indelible Ink And Shall Be Signed By The Bidder Or Its Duly Authorized Representative/s. 20.4. All Envelopes Shall: (a) Contain The Name Of The Contract To Be Bid In Capital Letters; (b) Bear The Name And Address Of The Bidder In Capital Letters; (c) Be Addressed To The Procuring Entity’s Bac Identified In Itb Clause 10.1; (d) Bear The Specific Identification Of This Bidding Process Indicated In The Invitation To Bid; And (e) Bear A Warning “do Not Open Before…” The Date And Time For The Opening Of Bids, In Accordance With Itb Clause 21. 20.5. If Bids Are Not Sealed And Marked As Required, The Procuring Entity Will Assume No Responsibility For The Misplacement Or Premature Opening Of The Bid. D. Submission And Opening Of Bids 21. Deadline For Submission Of Bids Bids Must Be Received By The Procuring Entity’s Bac At The Address And On Or Before The Date And Time Indicated In The Bds. 22. Late Bids Any Bid Submitted After The Deadline For Submission And Receipt Of Bids Prescribed By The Procuring Entity, Pursuant To Itb Clause 21, Shall Be Declared “late” And Shall Not Be Accepted By The Procuring Entity. 23. Modification And Withdrawal Of Bids 23.1. The Bidder May Modify Its Bid After It Has Been Submitted; Provided That The Modification Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. The Bidder Shall Not Be Allowed To Retrieve Its Original Bid, But Shall Be Allowed To Submit Another Bid Equally Sealed, Properly Identified, Linked To Its Original Bid Marked As “technical Modification” Or “financial Modification” And Stamped “received” By The Bac. Bid Modifications Received After The Applicable Deadline Shall Not Be Considered And Shall Be Returned To The Bidder Unopened. 23.2. A Bidder May, Through A Letter Of Withdrawal, Withdraw Its Bid After It Has Been Submitted, For Valid And Justifiable Reason; Provided That The Letter Of Withdrawal Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. 23.3. Bids Requested To Be Withdrawn In Accordance With Itb Clause 23.1 Shall Be Returned Unopened To The Bidders. A Bidder May Also Express Its Intention Not To Participate In The Bidding Through A Letter Which Should Reach And Be Stamped By The Bac Before The Deadline For Submission And Receipt Of Bids. A Bidder That Withdraws Its Bid Shall Not Be Permitted To Submit Another Bid, Directly Or Indirectly, For The Same Contract. 23.4. No Bid May Be Modified After The Deadline For Submission Of Bids. No Bid May Be Withdrawn In The Interval Between The Deadline For Submission Of Bids And The Expiration Of The Period Of Bid Validity Specified By The Bidder On The Financial Bid Form. Withdrawal Of A Bid During This Interval Shall Result In The Forfeiture Of The Bidder’s Bid Security, Pursuant To Itb Clause 18.5, And The Imposition Of Administrative, Civil, And Criminal Sanctions As Prescribed By Ra 9184 And Its Irr. 24. Opening And Preliminary Examination Of Bids 24.1. The Bac Shall Open The First Bid Envelopes Of Bidders In Public As Specified In The Bds To Determine Each Bidder’s Compliance With The Documents Prescribed In Itb Clause 12. For This Purpose, The Bac Shall Check The Submitted Documents Of Each Bidder Against A Checklist Of Required Documents To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion. If A Bidder Submits The Required Document, It Shall Be Rated “passed” For That Particular Requirement. In This Regard, Bids That Fail To Include Any Requirement Or Are Incomplete Or Patently Insufficient Shall Be Considered As “failed”. Otherwise, The Bac Shall Rate The Said First Bid Envelope As “passed”. 24.2. Unless Otherwise Specified In The Bds, Immediately After Determining Compliance With The Requirements In The First Envelope, The Bac Shall Forthwith Open The Second Bid Envelope Of Each Remaining Eligible Bidder Whose First Bid Envelope Was Rated “passed”. The Second Envelope Of Each Complying Bidder Shall Be Opened Within The Same Day. In Case One Or More Of The Requirements In The Second Envelope Of A Particular Bid Is Missing, Incomplete Or Patently Insufficient, And/or If The Submitted Total Bid Price Exceeds The Abc Unless Otherwise Provided In Itb Clause 13.1(b), The Bac Shall Rate The Bid Concerned As “failed”. Only Bids That Are Determined To Contain All The Bid Requirements For Both Components Shall Be Rated “passed” And Shall Immediately Be Considered For Evaluation And Comparison. 24.3. Letters Of Withdrawal Shall Be Read Out And Recorded During Bid Opening, And The Envelope Containing The Corresponding Withdrawn Bid Shall Be Returned To The Bidder Unopened. If The Withdrawing Bidder’s Representative Is In Attendance, The Original Bid And All Copies Thereof Shall Be Returned To The Representative During The Bid Opening. If The Representative Is Not In Attendance, The Bid Shall Be Returned Unopened By Registered Mail. The Bidder May Withdraw Its Bid Prior To The Deadline For The Submission And Receipt Of Bids, Provided That The Corresponding Letter Of Withdrawal Contains A Valid Authorization Requesting For Such Withdrawal, Subject To Appropriate Administrative Sanctions. 24.4. If A Bidder Has Previously Secured A Certification From The Procuring Entity To The Effect That It Has Previously Submitted The Above-enumerated Class “a” Documents, The Said Certification May Be Submitted In Lieu Of The Requirements Enumerated In Itb Clause 12.1(a), Items (i) To (vi). 24.5. In The Case Of An Eligible Foreign Bidder As Described In Itb Clause 5, The Class “a” Documents Enumerated In Itb Clause 12.1(a) May Be Substituted With The Appropriate Equivalent Documents, If Any, Issued By The Country Of The Foreign Bidder Concerned. 24.6. Each Partner Of A Joint Venture Agreement Shall Likewise Submit The Documents Required In Itb Clauses 12.1(a)(i) And 12.1(a)(ii). Submission Of Documents Required Under Itb Clauses 12.1(a)(iii) To 12.1(a)(vi) By Any Of The Joint Venture Partners Constitutes Compliance. 24.7. A Bidder Determined As “failed” Has Three (3) Calendar Days Upon Written Notice Or, If Present At The Time Of Bid Opening, Upon Verbal Notification Within Which To File A Request For Reconsideration With The Bac: Provided, However, That The Request For Reconsideration Shall Not Be Granted If It Is Established That The Finding Of Failure Is Due To The Fault Of The Bidder Concerned: Provided, Further, That The Bac Shall Decide On The Request For Reconsideration Within Seven (7) Calendar Days From Receipt Thereof. If A Failed Bidder Signifies His Intent To File A Request For Reconsideration, The Bac Shall Keep The Bid Envelopes Of The Said Failed Bidder Unopened And/or Duly Sealed Until Such Time That The Request For Reconsideration Or Protest Has Been Resolved. E. Evaluation And Comparison Of Bids 25. Process To Be Confidential 25.1. Members Of The Bac, Including Its Staff And Personnel, As Well As Its Secretariat And Twg, Are Prohibited From Making Or Accepting Any Kind Of Communication With Any Bidder Regarding The Evaluation Of Their Bids Until The Issuance Of The Notice Of Award, Unless N The Case Of Itb Clause 26. 25.2. Any Effort By A Bidder To Influence The Procuring Entity In The Procuring Entity’s Decision In Respect Of Bid Evaluation, Bid Comparison Or Contract Award Will Result In The Rejection Of The Bidder’s Bid. 26. Clarification Of Bids To Assist In The Evaluation, Comparison And Post-qualification Of The Bids, The Procuring Entity May Ask In Writing Any Bidder For A Clarification Of Its Bid. All Responses To Requests For Clarification Shall Be In Writing. Any Clarification Submitted By A Bidder In Respect To Its Bid And That Is Not In Response To A Request By The Procuring Entity Shall Not Be Considered 27. Detailed Evaluation And Comparison Of Bids 27.1. The Procuring Entity Will Undertake The Detailed Evaluation And Comparison Of Bids Which Have Passed The Opening And Preliminary Examination Of Bids, Pursuant To Itb Clause 24, In Order To Determine The Lowest Calculated Bid. 27.2. In Evaluating The Bids To Get The Lowest Calculated Bid, The Procuring Entity Shall Undertake The Following: (a) The Detailed Evaluation Of The Financial Component Of The Bids, To Establish The Correct Calculated Prices Of The Bids; And (b) The Ranking Of The Total Bid Prices As So Calculated From The Lowest To Highest. The Bid With The Lowest Price Shall Be Identified As The Lowest Calculated Bid. 27.3. The Procuring Entity's Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary “pass/fail” Criterion. The Bac Shall Consider The Following In The Evaluation Of Bids: (a) Completeness Of The Bid. Unless The Itb Specifically Allows Partial Bids, Bids Not Addressing Or Providing All Of The Required Items In The Schedule Of Requirements Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A "0" (zero) For The Said Item Would Mean That It Is Being Offered For Free To The Procuring Entity; And (b) Arithmetical Corrections. Consider Computational Errors And Omissions To Enable Proper Comparison Of All Eligible Bids. It May Also Consider Bid Modifications If Expressly Allowed In The Bds. Any Adjustment Shall Be Calculated In Monetary Terms To Determine The Calculated Prices. 27.4. Based On The Detailed Evaluation Of Bids, Those That Comply With The Above-mentioned Requirements Shall Be Ranked In The Ascending Order Of Their Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, To Identify The Lowest Calculated Bid. Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, Which Exceed The Abc Shall Not Be Considered, Unless Otherwise Indicated In The Bds. 27.5. The Procuring Entity’s Evaluation Of Bids Shall Only Be Based On The Bid Price Quoted In The Financial Bid Form 27.6. Bids Shall Be Evaluated On An Equal Footing To Ensure Fair Competition. For This Purpose, All Bidders Shall Be Required To Include In Their Bids The Cost Of All Taxes, Such As, But Not Limited To, Value Added Tax (vat), Income Tax, Local Taxes, And Other Fiscal Levies And Duties Which Shall Be Itemized In The Bid Form And Reflected In The Detailed Estimates. Such Bids, Including Said Taxes, Shall Be The Basis For Bid Evaluation And Comparison. 28. Post Qualification 28.1. The Procuring Entity Shall Determine To Its Satisfaction Whether The Bidder That Is Evaluated As Having Submitted The Lowest Calculated Bid (lcb) Complies With And Is Responsive To All The Requirements And Conditions Specified In Itb Clauses 5, 12, And 13. 28.2. Within A Non-extendible Period Of Three (3) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lcb, The Bidder Shall Submit The Following Documentary Requirements: (a) Tax Clearance Per Executive Order 398, Series Of 2005; (b) Latest Income And Business Tax Returns In The Form Specified In The Bds; (c) Certificate Of Philgeps Registration; And (d) Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. Failure Of The Bidder Declared As Lcb To Duly Submit The Requirements Under This Clause Or A Finding Against The Veracity Of Such, Shall Be Ground For Forfeiture Of The Bid Security And Disqualification Of The Bidder For Award. 28.3. The Determination Shall Be Based Upon An Examination Of The Documentary Evidence Of The Bidder’s Qualifications Submitted Pursuant To Itb Clauses 12 And 13, As Well As Other Information As The Procuring Entity Deems Necessary And Appropriate, Using A Non-discretionary “pass/fail” Criterion. 28.4. If The Bac Determines That The Bidder With The Lowest Calculated Bid Passes All The Criteria For Post-qualification, It Shall Declare The Said Bid As The Lowest Calculated Responsive Bid, And Recommend To The Head Of The Procuring Entity The Award Of Contract To The Said Bidder At Its Submitted Price Or Its Calculated Bid Price, Whichever Is Lower, Subject To Itb Clause 30.3. 28.5. A Negative Determination Shall Result In Rejection Of The Bidder’s Bid, In Which Event The Procuring Entity Shall Proceed To The Next Lowest Calculated Bid To Make A Similar Determination Of That Bidder’s Capabilities To Perform Satisfactorily. If The Second Bidder, However, Fails The Post Qualification, The Procedure For Post Qualification Shall Be Repeated For The Bidder With The Next Lowest Calculated Bid, And So On Until The Lowest Calculated And Responsive Bid Is Determined For Contract Award. 28.6. Within A Period Not Exceeding Seven (7) Calendar Days From The Date Of Receipt Of The Recommendation Of The Bac, The Head Of The Procuring Entity Shall Approve Or Disapprove The Said Recommendation. In The Case Of Government Owned And Government-owned And/or -controlled Corporations (goccs) And Government Financial Institutions (gfis), The Period Provided Herein Shall Be Fifteen (15) Calendar Days. 29. Reservation Clause 29.1. Notwithstanding The Eligibility Or Post-qualification Of A Bidder, The Procuring Entity Concerned Reserves The Right To Review Its Qualifications At Any Stage Of The Procurement Process If It Has Reasonable Grounds To Believe That A Misrepresentation Has Been Made By The Said Bidder, Or That There Has Been A Change In The Bidder’s Capability To Undertake The Project From The Time It Submitted Its Eligibility Requirements. Should Such Review Uncover Any Misrepresentation Made In The Eligibility And Bidding Requirements, Statements Or Documents, Or Any Changes In The Situation Of The Bidder Which Will Affect Its Capability To Undertake The Project So That It Fails The Preset Eligibility Or Bid Evaluation Criteria, The Procuring Entity Shall Consider The Said Bidder As Ineligible And Shall Disqualify It From Submitting A Bid Or From Obtaining An Award Or Contract. 29.2. Based On The Following Grounds, The Procuring Entity Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding At Any Time Prior To The Contract Award, Or Not To Award The Contract, Without Thereby Incurring Any Liability, And Make No Assurance That A Contract Shall Be Entered Into As A Result Of The Bidding: (a) If There Is Prima Facie Evidence Of Collusion Between Appropriate Public Officers Or Employees Of The Procuring Entity, Or Between The Bac And Any Of The Bidders, Or If The Collusion Is Between Or Among The Bidders Themselves, Or Between A Bidder And A Third Party, Including Any Act Which Restricts, Suppresses Or Nullifies Or Tends To Restrict, Suppress Or Nullify Competition; (b) If The Procuring Entity’s Bac Is Found To Have Failed In Following The Prescribed Bidding Procedures; Or (c) For Any Justifiable And Reasonable Ground Where The Award Of The Contract Will Not Redound To The Benefit Of The Government As Follows: (i) If The Physical And Economic Conditions Have Significantly Changed So As To Render The Project No Longer Economically, Financially Or Technically Feasible As Determined By The Head Of The Procuring Entity; (ii) If The Project Is No Longer Necessary As Determined By The Head Of The Procuring Entity; And (iii) If The Source Of Funds For The Project Has Been Withheld Or Reduced Through No Fault Of The Procuring Entity. 29.3. In Addition, The Procuring Entity May Likewise Declare A Failure Of Bidding When: (a) No Bids Are Received; (b) All Prospective Bidders Are Declared Ineligible; (c) All Bids Fail To Comply With All The Bid Requirements Or Fail Post-qualification; Or (d) The Bidder With The Lowest Calculated Responsive Bid Refuses, Without Justifiable Cause To Accept The Award Of Contract, And No Award Is Made. F. Award Of Contract 30. Contract Award 30.1. Subject To Itb Clause 28, The Procuring Entity Shall Award The Contract To The Bidder Whose Bid Has Been Determined To Be The Lowest Calculated And Responsive Bid (lcrb). 30.2. Prior To The Expiration Of The Period Of Bid Validity, The Procuring Entity Shall Notify The Successful Bidder In Writing That Its Bid Has Been Accepted, Through A Notice Of Award Received Personally Or Sent By Registered Mail Or Electronically, Receipt Of Which Must Be Confirmed In Writing Within Two (2) Days By The Lcrb And Submitted Personally Or Sent By Registered Mail Or Electronically To The Procuring Entity. 30.3. Notwithstanding The Issuance Of The Notice Of Award, Award Of Contract Shall Be Subject To The Following Conditions: (a) Submission Of The Following Documents Within The Prescribed Period From Receipt By The Bidder Of The Notice That It Has The Lowest Calculated And Responsive Bid: (i) Valid Jva, If Applicable, Within Ten (10) Calendar Days; (ii) Valid Pcab License And Registration For The Type And Cost Of The Contract To Be Bid For Foreign Bidders, Within Thirty (30) Calendar Days, If Allowed Under A Treaty Or International Or Executive Agreement Mentioned In Itb Clause 12.1(a)(iv); (b) Posting Of The Performance Security In Accordance With Itb Clause 32; (c) Signing Of The Contract As Provided In Itb Clause 31; And (d) Approval By Higher Authority, If Required. 31. Signing Of The Contract 31.1. At The Same Time As The Procuring Entity Notifies The Successful Bidder That Its Bid Has Been Accepted, The Procuring Entity Shall Send The Contract Form To The Bidder, Which Contract Has Been Provided In The Bidding Documents, Incorporating Therein All Agreements Between The Parties. 31.2. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award, The Successful Bidder Shall Post The Required Performance Security, Sign And Date The Contract And Return It To The Procuring Entity. 31.3. The Procuring Entity Shall Enter Into Contract With The Successful Bidder Within The Same Ten (10) Calendar Day Period Provided That All The Documentary Requirements Are Complied With. 31.4. The Following Documents Shall Form Part Of The Contract: (a) Contract Agreement; (b) Bidding Documents; (c) Winning Bidder’s Bid, Including The Technical And Financial Proposals, And All Other Documents/statements Submitted; (d) Performance Security; (e) Credit Line In Accordance With Itb Clause 5.5, If Applicable; (f) Notice Of Award Of Contract; And (g) Other Contract Documents That May Be Required By Existing Laws And/or Specified In The Bds. 32. Performance Security 32.1. To Guarantee The Faithful Performance By The Winning Bidder Of Its Obligations Under The Contract, It Shall Post A Performance Security Within A Maximum Period Of Ten (10) Calendar Days From The Receipt Of The Notice Of Award From The Procuring Entity And In No Case Later Than The Signing Of The Contract. 32.2. The Performance Security Shall Be Denominated In Philippine Pesos And Posted In Favor Of The Procuring Entity In An Amount Equal To The Percentage Of The Total Contract Price As Stated In The Bds In Accordance With The Following Schedule: 33. 33.1. Form Of Performance Security Amount Of Performance Security (equal To Percentage Of The Total Contract Price) (a) Cash Or Cashier’s/manager’s Check Issued By A Universal Or Commercial Bank. Ten Percent (10%) (b) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank. (c) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security; And/or Thirty Percent (30%) (d) Any Combination Of The Foregoing. Proportionate To Share Of Form With Respect To Total Amount Of Security 33.2. Failure Of The Successful Bidder To Comply With The Above-mentioned Requirement Shall Constitute Sufficient Ground For The Annulment Of The Award And Forfeiture Of The Bid Security, In Which Event The Procuring Entity Shall Initiate And Complete The Post Qualification Of The Second Lowest Calculated Bid. The Procedure Shall Be Repeated Until The Lowest Calculated And Responsive Bid Is Identified And Selected For Contract Award. However If No Bidder Passed Post-qualification, The Bac Shall Declare The Bidding A Failure And Conduct A Re-bidding With Re-advertisement. 34. Notice To Proceed 34.1. Within Three (3) Calendar Days From The Date Of Approval Of The Contract By The Appropriate Government Approving Authority, The Procuring Entity Shall Issue Its Notice To Proceed To The Bidder. 34.2. The Contract Effectivity Date Shall Be Provided In The Notice To Proceed By The Procuring Entity, Which Date Shall Not Be Later Than Seven (7) Calendar Days From The Issuance Of The Notice To Proceed. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 1.1 The Procuring Entity Is Lgu- Mapanas, Northern Samar. The Name Of The Contract Is Rehabilitation Of Farm-to-market Road, Brgy. E. Laodenio, Mapanas, Northern Samar The Identification Number Of The Contract Is Pr No-2025-01-06___ 2 The Funding Source Is: Lgsf-sbdp For Fy 2024. The Name Of The Project Is: Rehabilitation Of Farm-to-market Road, Brgy. E. Laodenio, Mapanas, Northern Samar 3.1 No Further Instructions. 5.1 No Further Instructions. 5.2 Bidding Is Restricted To Eligible Bidders As Defined In Itb Clause 5.1. 5.4 For This Purpose, Similar Contracts Shall Refer To Bidder’s Annual Turnover From All Works Average Over The Last Three Years Shall Be Equal To 50% Of The Estimated Cost Of The Contract Being Procured. The Bidder Must Have Completed, Within The Past Ten (10) Years From The Submission Of Bids, A Single Contract That Is Similar To This Project, Equivalent To At Least Eighty Percent (80%) Of The Abc. 8.1 “subcontracting Is Not Allowed.” 8.2 “not Applicable”. 9.1 The Procuring Entity Will Hold A Pre-bid Conference For This Project On January 10, 2025 At 10:00 A.m. At Executive Conference 2nd Floor Of New Municipal Bldg. Mapanas, Northern Samar. 10.1 The Procuring Entity’s Address Is: The Municipality Of Mapanas, Province Of Northern Samar Ma. Teresa L. Minguez Lgu-bac Chairperson Tel. No. 09778033758 10.3 No Further Instructions. 12.1 Not Applicable 12.1(a)(i) “no Other Acceptable Proof Of Registration Is Recognized.” 12.1(a)(iv) No Further Instructions. 13.1 “no Additional Requirements” 13.1(b) The Abc Is Php4,999,779.12 Any Bid With A Financial Component Exceeding This Amount Shall Not Be Accepted. 14.2 “no Further Instructions.” 15.4 No Further Instruction. 16.1 The Bid Prices Shall Be Quoted In Philippine Pesos. 17.1 Bids Will Be Valid Until 90 Calendar Days After The Bid Submission Deadline Date As Prescribed By The Procuring Entity) 18.1 The Bid Security Shall Be In The Following Amount: 1. The Amount Of 99,995.58 If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; 2. The Amount Of P249,989.00 If Bid Security Is In Surety Bond; Or 3. Any Combination Of The Foregoing Proportionate To The Share Of Form With Respect To Total Amount Of Security. 18.2 The Bid Security Shall Be Valid Twenty Eight Days Beyond The Validity Period Of The Bid. 20.3 Each Bidder Shall Submit One Original And One Copy Of The First And Second Components Of Its Bid. 21 The Address For Submission Of Bids Is Ma. Teresa L. Minguez Lgu-bac Chairperson Bac Office @ Mpdo, 1st Floor, New Municipal Bldg. Municipality Of Mapanas, Northern Samar The Deadline For Submission Of Bids Is 9:00 A.m. On January 21, 2025. 22 The Place Of Bid Opening Is Executive Conference Room, 2nd Floor, New Municipal Bldg. Municipality Of Mapanas, Northern Samar. The Date And Time Of Bid Opening Is January 15, 2025 At Exactly 10:00 A.m. 24.2 No Further Instructions. 27.3(b) Bid Modification Is Not Allowed. 27.4 No Further Instructions. 28.2(b) Bidders Have Option To Submit Manually Filed Tax Returns Or Tax Returns Filed Through The Electronic Filing And Payments System (efps). Note: The Latest Income And Business Tax Returns Are Those Within The Last Six Months Preceding The Date Of Bid Submission. 28.2(d) List Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It. 1. Taxpayer’s Identification Number 2. Vat Registration 3. Philippine Contractors Accreditation Board (pcab) License The Requirements Are Applicable Only In A Case Where The Lowest Calculated Bid (lcb) Is Submitted By A Domestic Bidder, And If The Lowest Calculated Bid (lcb) Is Submitted By A Foreign Bidder, This Requirements Are Not Applicable 31.4(g) List Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Department Of Labor And Employment, And Pert/cpm. 32.2 The Performance Security Shall Be In The Following Amount: 1. The Amount Of 10% Of Contract If Performance Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; 2. The Amount Of 30% Of Contract If Performance Security Is In Surety Bond; Or 3. Any Combination Of The Foregoing Proportionate To The Share Of Form With Respect To Total Amount Of Security. Section Iv. General Conditions Of Contract Table Of Contents 1. Definitions 41 2. Interpretation 43 3. Governing Language And Law 43 4. Communications 43 5. Possession Of Site 43 6. The Contractor’s Obligations 44 7. Performance Security 45 8. Subcontracting 46 9. Liquidated Damages 46 10. Site Investigation Reports 47 11. The Procuring Entity, Licenses And Permits 47 12. Contractor’s Risk And Warranty Security 47 13. Liability Of The Contractor 49 14. Procuring Entity’s Risk 49 15. Insurance 49 16. Termination For Default Of Contractor 51 17. Termination For Default Of Procuring Entity 51 18. Termination For Other Causes 52 19. Procedures For Termination Of Contracts 53 20. Force Majeure, Release From Performance 56 21. Resolution Of Disputes 56 22. Suspension Of Loan, Credit, Grant, Or Appropriation 57 23. Procuring Entity’s Representative’s Decisions 57 24. Approval Of Drawings And Temporary Works By The Procuring Entity’s Representative 57 25. Acceleration And Delays Ordered By The Procuring Entity’s Representative 58 26. Extension Of The Intended Completion Date 58 27. Right To Vary 58 28. Contractors Right To Claim 59 29. Dayworks 59 30. Early Warning 59 31. Program Of Work 59 32. Management Conferences 60 33. Bill Of Quantities 60 34. Instructions, Inspections And Audits 61 35. Identifying Defects 61 36. Cost Of Repairs 61 37. Correction Of Defects 61 38. Uncorrected Defects 62 39. Advance Payment 62 40. Progress Payments 62 41. Payment Certificates 63 42. Retention 63 43. Variation Orders 64 44. Contract Completion 66 45. Suspension Of Work 66 46. Payment On Termination 67 47. Extension Of Contract Time 67 48. Price Adjustment 68 49. Completion 68 50. Taking Over 69 51. Operating And Maintenance Manuals 69 1. Definitions For Purposes Of This Clause, Boldface Type Is Used To Identify Defined Terms. 1.1. The Arbiter Is The Person Appointed Jointly By The Procuring Entity And The Contractor To Resolve Disputes In The First Instance, As Provided For In Gcc Clause 21. 1.2. Bill Of Quantities Refers To A List Of The Specific Items Of The Work And Their Corresponding Unit Prices, Lump Sums, And/or Provisional Sums. 1.3. The Completion Date Is The Date Of Completion Of The Works As Certified By The Procuring Entity’s Representative, In Accordance With Gcc Clause 49. 1.4. The Contract Is The Contract Between The Procuring Entity And The Contractor To Execute, Complete, And Maintain The Works. 1.5. The Contract Price Is The Price Stated In The Letter Of Acceptance And Thereafter To Be Paid By The Procuring Entity To The Contractor For The Execution Of The Works In Accordance With This Contract. 1.6. Contract Time Extension Is The Allowable Period For The Contractor To Complete The Works In Addition To The Original Completion Date Stated In This Contract. 1.7. The Contractor Is The Juridical Entity Whose Proposal Has Been Accepted By The Procuring Entity And To Whom The Contract To Execute The Work Was Awarded. 1.8. The Contractor’s Bid Is The Signed Offer Or Proposal Submitted By The Contractor To The Procuring Entity In Response To The Bidding Documents. 1.9. Days Are Calendar Days; Months Are Calendar Months. 1.10. Dayworks Are Varied Work Inputs Subject To Payment On A Time Basis For The Contractor’s Employees And Equipment, In Addition To Payments For Associated Materials And Plant. 1.11. A Defect Is Any Part Of The Works Not Completed In Accordance With The Contract. 1.12. The Defects Liability Certificate Is The Certificate Issued By Procuring Entity’s Representative Upon Correction Of Defects By The Contractor. 1.13. The Defects Liability Period Is The One Year Period Between Contract Completion And Final Acceptance Within Which The Contractor Assumes The Responsibility To Undertake The Repair Of Any Damage To The Works At His Own Expense. 1.14. Drawings Are Graphical Presentations Of The Works. They Include All Supplementary Details, Shop Drawings, Calculations, And Other Information Provided Or Approved For The Execution Of This Contract. 1.15. Equipment Refers To All Facilities, Supplies, Appliances, Materials Or Things Required For The Execution And Completion Of The Work Provided By The Contractor And Which Shall Not Form Or Are Not Intended To Form Part Of The Permanent Works. 1.16. The Intended Completion Date Refers To The Date Specified In The Scc When The Contractor Is Expected To Have Completed The Works. The Intended Completion Date May Be Revised Only By The Procuring Entity’s Representative By Issuing An Extension Of Time Or An Acceleration Order. 1.17. Materials Are All Supplies, Including Consumables, Used By The Contractor For Incorporation In The Works. 1.18. The Notice To Proceed Is A Written Notice Issued By The Procuring Entity Or The Procuring Entity’s Representative To The Contractor Requiring The Latter To Begin The Commencement Of The Work Not Later Than A Specified Or Determinable Date. 1.19. Permanent Works All Permanent Structures And All Other Project Features And Facilities Required To Be Constructed And Completed In Accordance With This Contract Which Shall Be Delivered To The Procuring Entity And Which Shall Remain At The Site After The Removal Of All Temporary Works. 1.20. Plant Refers To The Machinery, Apparatus, And The Like Intended To Form An Integral Part Of The Permanent Works. 1.21. The Procuring Entity Is The Party Who Employs The Contractor To Carry Out The Works Stated In The Scc. 1.22. The Procuring Entity’s Representative Refers To The Head Of The Procuring Entity Or His Duly Authorized Representative, Identified In The Scc, Who Shall Be Responsible For Supervising The Execution Of The Works And Administering This Contract. 1.23. The Site Is The Place Provided By The Procuring Entity Where The Works Shall Be Executed And Any Other Place Or Places Which May Be Designated In The Scc, Or Notified To The Contractor By The Procuring Entity’s Representative As Forming Part Of The Site. 1.24. Site Investigation Reports Are Those That Were Included In The Bidding Documents And Are Factual And Interpretative Reports About The Surface And Subsurface Conditions At The Site. 1.25. Slippage Is A Delay In Work Execution Occurring When Actual Accomplishment Falls Below The Target As Measured By The Difference Between The Scheduled And Actual Accomplishment Of The Work By The Contractor As Established From The Work Schedule. This Is Actually Described As A Percentage Of The Whole Works. 1.26. Specifications Means The Description Of Works To Be Done And The Qualities Of Materials To Be Used, The Equipment To Be Installed And The Mode Of Construction. 1.27. The Start Date, As Specified In The Scc, Is The Date When The Contractor Is Obliged To Commence Execution Of The Works. It Does Not Necessarily Coincide With Any Of The Site Possession Dates. 1.28. A Subcontractor Is Any Person Or Organization To Whom A Part Of The Works Has Been Subcontracted By The Contractor, As Allowed By The Procuring Entity, But Not Any Assignee Of Such Person. 1.29. Temporary Works Are Works Designed, Constructed, Installed, And Removed By The Contractor That Are Needed For Construction Or Installation Of The Permanent Works. 1.30. Work(s)refer To The Permanent Works And Temporary Works To Be Executed By The Contractor In Accordance With This Contract, Including (i) The Furnishing Of All Labor, Materials, Equipment And Others Incidental, Necessary Or Convenient To The Complete Execution Of The Works; (ii) The Passing Of Any Tests Before Acceptance By The Procuring Entity’s Representative; (iii) And The Carrying Out Of All Duties And Obligations Of The Contractor Imposed By This Contract As Described In The Scc. 2. Interpretation 2.1. In Interpreting The Conditions Of Contract, Singular Also Means Plural, Male Also Means Female Or Neuter, And The Other Way Around. Headings Have No Significance. Words Have Their Normal Meaning Under The Language Of This Contract Unless Specifically Defined. The Procuring Entity’s Representative Will Provide Instructions Clarifying Queries About The Conditions Of Contract. 2.2. If Sectional Completion Is Specified In The Scc, References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Governing Language And Law 3.1. This Contract Has Been Executed In The English Language, Which Shall Be The Binding And Controlling Language For All Matters Relating To The Meaning Or Interpretation Of This Contract. All Correspondence And Other Documents Pertaining To This Contract Which Are Exchanged By The Parties Shall Be Written In English. 3.2. This Contract Shall Be Interpreted In Accordance With The Laws Of The Republic Of The Philippines. 4. Communications Communications Between Parties That Are Referred To In The Conditions Shall Be Effective Only When In Writing. A Notice Shall Be Effective Only When It Is Received By The Concerned Party. 5. Possession Of Site 5.1. On The Date Specified In The Scc, The Procuring Entity Shall Grant The Contractor Possession Of So Much Of The Site As May Be Required To Enable It To Proceed With The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 5.2. If Possession Of A Portion Is Not Given By The Date Stated In The Scc Clause 5.1, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contact Time To Address Such Delay Shall Be In Accordance With Gcc Clause 47. 5.3. The Contractor Shall Bear All Costs And Charges For Special Or Temporary Right-of-way Required By It In Connection With Access To The Site. The Contractor Shall Also Provide At His Own Cost Any Additional Facilities Outside The Site Required By It For Purposes Of The Works. 5.4. The Contractor Shall Allow The Procuring Entity’s Representative And Any Person Authorized By The Procuring Entity’s Representative Access To The Site And To Any Place Where Work In Connection With This Contract Is Being Carried Out Or Is Intended To Be Carried Out. 6. The Contractor’s Obligations 6.1. The Contractor Shall Carry Out The Works Properly And In Accordance With This Contract. The Contractor Shall Provide All Supervision, Labor, Materials, Plant And Contractor's Equipment, Which May Be Required. All Materials And Plant On Site Shall Be Deemed To Be The Property Of The Procuring Entity. 6.2. The Contractor Shall Commence Execution Of The Works On The Start Date And Shall Carry Out The Works In Accordance With The Program Of Work Submitted By The Contractor, As Updated With The Approval Of The Procuring Entity’s Representative, And Complete Them By The Intended Completion Date. 6.3. The Contractor Shall Be Responsible For The Safety Of All Activities On The Site. 6.4. The Contractor Shall Carry Out All Instructions Of The Procuring Entity’s Representative That Comply With The Applicable Laws Where The Site Is Located. 6.5. The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel, As Referred To In The Scc, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 6.6. If The Procuring Entity’s Representative Asks The Contractor To Remove A Member Of The Contractor’s Staff Or Work Force, For Justifiable Cause, The Contractor Shall Ensure That The Person Leaves The Site Within Seven (7) Days And Has No Further Connection With The Work In This Contract. 6.7. During Contract Implementation, The Contractor And His Subcontractors Shall Abide At All Times By All Labor Laws, Including Child Labor Related Enactments, And Other Relevant Rules. 6.8. The Contractor Shall Submit To The Procuring Entity For Consent The Name And Particulars Of The Person Authorized To Receive Instructions On Behalf Of The Contractor. 6.9. The Contractor Shall Cooperate And Share The Site With Other Contractors, Public Authorities, Utilities, And The Procuring Entity Between The Dates Given In The Schedule Of Other Contractors Particularly When They Shall Require Access To The Site. The Contractor Shall Also Provide Facilities And Services For Them During This Period. The Procuring Entity May Modify The Schedule Of Other Contractors, And Shall Notify The Contractor Of Any Such Modification Thereto. 6.10. Should Anything Of Historical Or Other Interest Or Of Significant Value Be Unexpectedly Discovered On The Site, It Shall Be The Property Of The Procuring Entity. The Contractor Shall Notify The Procuring Entity’s Representative Of Such Discoveries And Carry Out The Procuring Entity’s Representative’s Instructions In Dealing With Them. 7. Performance Security 7.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Contractor Shall Furnish The Performance Security In Any The Forms Prescribed In Itb Clause 32.2. 7.2. The Performance Security Posted In Favor Of The Procuring Entity Shall Be Forfeited In The Event It Is Established That The Contractor Is In Default In Any Of Its Obligations Under The Contract. 7.3. The Performance Security Shall Remain Valid Until Issuance By The Procuring Entity Of The Certificate Of Final Acceptance. 7.4. The Performance Security May Be Released By The Procuring Entity And Returned To The Contractor After The Issuance Of The Certificate Of Final Acceptance Subject To The Following Conditions: (a) There Are No Pending Claims Against The Contractor Or The Surety Company Filed By The Procuring Entity; (b) The Contractor Has No Pending Claims For Labor And Materials Filed Against It; And (c) Other Terms Specified In The Scc. 7.5. The Contractor Shall Post An Additional Performance Security Following The Amount And Form Specified In Itb Clause 32.2 To Cover Any Cumulative Increase Of More Than Ten Percent (10%) Over The Original Value Of The Contract As A Result Of Amendments To Order Or Change Orders, Extra Work Orders And Supplemental Agreements, As The Case May Be. The Contractor Shall Cause The Extension Of The Validity Of The Performance Security To Cover Approved Contract Time Extensions. 7.6. In Case Of A Reduction In The Contract Value Or For Partially Completed Works Under The Contract Which Are Usable And Accepted By The Procuring Entity The Use Of Which, In The Judgment Of The Implementing Agency Or The Procuring Entity, Will Not Affect The Structural Integrity Of The Entire Project, The Procuring Entity Shall Allow A Proportional Reduction In The Original Performance Security, Provided That Any Such Reduction Is More Than Ten Percent (10%) And That The Aggregate Of Such Reductions Is Not More Than Fifty Percent (50%) Of The Original Performance Security. 7.7. Unless Otherwise Indicated In The Scc, The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Act 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 8. Subcontracting 8.1. Unless Otherwise Indicated In The Scc, The Contractor Cannot Subcontract Works More Than The Percentage Specified In Itb Clause 8.1. 8.2. Subcontracting Of Any Portion Of The Works Does Not Relieve The Contractor Of Any Liability Or Obligation Under This Contract. The Contractor Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants Or Workmen. 8.3. Subcontractors Disclosed And Identified During The Bidding May Be Changed During The Implementation Of This Contract, Subject To Compliance With The Required Qualifications And The Approval Of The Procuring Entity. 9. Liquidated Damages 9.1. The Contractor Shall Pay Liquidated Damages To The Procuring Entity For Each Day That The Completion Date Is Later Than The Intended Completion Date. The Applicable Liquidated Damages Is At Least One-tenth (1/10) Of A Percent Of The Cost Of The Unperformed Portion For Every Day Of Delay. The Total Amount Of Liquidated Damages Shall Not Exceed Ten Percent (10%) Of The Amount Of The Contract. The Procuring Entity May Deduct Liquidated Damages From Payments Due To The Contractor. Payment Of Liquidated Damages Shall Not Affect The Contractor. Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of This Contract, The Procuring Entity Shall Rescind This Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. 9.2. If The Intended Completion Date Is Extended After Liquidated Damages Have Been Paid, The Engineer Of The Procuring Entity Shall Correct Any Overpayment Of Liquidated Damages By The Contractor By Adjusting The Next Payment Certificate. The Contractor Shall Be Paid Interest On The Overpayment, Calculated From The Date Of Payment To The Date Of Repayment, At The Rates Specified In Gcc Clause 40.3. 10. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 11. The Procuring Entity, Licenses And Permits The Procuring Entity Shall, If Requested By The Contractor, Assist Him In Applying For Permits, Licenses Or Approvals, Which Are Required For The Works. 12. Contractor’s Risk And Warranty Security 12.1. The Contractor Shall Assume Full Responsibility For The Works From The Time Project Construction Commenced Up To Final Acceptance By The Procuring Entity And Shall Be Held Responsible For Any Damage Or Destruction Of The Works Except Those Occasioned By Force Majeure. The Contractor Shall Be Fully Responsible For The Safety, Protection, Security, And Convenience Of His Personnel, Third Parties, And The Public At Large, As Well As The Works, Equipment, Installation, And The Like To Be Affected By His Construction Work. 12.2. The Defects Liability Period For Infrastructure Projects Shall Be One Year From Contract Completion Up To Final Acceptance By The Procuring Entity. During This Period, The Contractor Shall Undertake The Repair Works, At His Own Expense, Of Any Damage To The Works On Account Of The Use Of Materials Of Inferior Quality Within Ninety (90) Days From The Time The Head Of The Procuring Entity Has Issued An Order To Undertake Repair. In Case Of Failure Or Refusal To Comply With This Mandate, The Procuring Entity Shall Undertake Such Repair Works And Shall Be Entitled To Full Reimbursement Of Expenses Incurred Therein Upon Demand. 12.3. Unless Otherwise Indicated In The Scc, In Case The Contractor Fails To Comply With The Preceding Paragraph, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property (ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 12.4. After Final Acceptance Of The Works By The Procuring Entity, The Contractor Shall Be Held Responsible For “structural Defects”, I.e., Major Faults/flaws/deficiencies In One Or More Key Structural Elements Of The Project Which May Lead To Structural Failure Of The Completed Elements Or Structure, Or “structural Failures”, I.e., Where One Or More Key Structural Elements In An Infrastructure Facility Fails Or Collapses, Thereby Rendering The Facility Or Part Thereof Incapable Of Withstanding The Design Loads, And/or Endangering The Safety Of The Users Or The General Public: (a) Contractor – Where Structural Defects/failures Arise Due To Faults Attributable To Improper Construction, Use Of Inferior Quality/substandard Materials, And Any Violation Of The Contract Plans And Specifications, The Contractor Shall Be Held Liable; (b) Consultants – Where Structural Defects/failures Arise Due To Faulty And/or Inadequate Design And Specifications As Well As Construction Supervision, Then The Consultant Who Prepared The Design Or Undertook Construction Supervision For The Project Shall Be Held Liable; (c) Procuring Entity’s Representatives/project Manager/construction Managers And Supervisors – The Project Owner’s Representative(s), Project Manager, Construction Manager, And Supervisor(s) Shall Be Held Liable In Cases Where The Structural Defects/failures Are Due To His/their Willful Intervention In Altering The Designs And Other Specifications; Negligence Or Omission In Not Approving Or Acting On Proposed Changes To Noted Defects Or Deficiencies In The Design And/or Specifications; And The Use Of Substandard Construction Materials In The Project; (d) Third Parties - Third Parties Shall Be Held Liable In Cases Where Structural Defects/failures Are Caused By Work Undertaken By Them Such As Leaking Pipes, Diggings Or Excavations, Underground Cables And Electrical Wires, Underground Tunnel, Mining Shaft And The Like, In Which Case The Applicable Warranty To Such Structure Should Be Levied To Third Parties For Their Construction Or Restoration Works. (e) Users - In Cases Where Structural Defects/failures Are Due To Abuse/misuse By The End User Of The Constructed Facility And/or Non–compliance By A User With The Technical Design Limits And/or Intended Purpose Of The Same, Then The User Concerned Shall Be Held Liable. 12.5. The Warranty Against Structural Defects/failures, Except Those Occasioned On Force Majeure, Shall Cover The Period Specified In The Scc Reckoned From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. 12.6. The Contractor Shall Be Required To Put Up A Warranty Security In The Form Of Cash, Bank Guarantee, Letter Of Credit, Gsis Or Surety Bond Callable On Demand, In Accordance With The Following Schedule: Form Of Warranty Minimum Amount In Percentage (%) Of Total Contract Price (a) Cash Or Letter Of Credit Issued By Universal Or Commercial Bank: Provided, However, That The Letter Of Credit Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank Five Percent (5%) (b) Bank Guarantee Confirmed By Universal Or Commercial Bank: Provided, However, That The Letter Of Credit Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank Ten Percent (10%) (c) Surety Bond Callable Upon Demand Issued By Gsis Or Any Surety Or Insurance Company Duly Certified By The Insurance Commission Thirty Percent (30%) 12.7. The Warranty Security Shall Be Stated In Philippine Pesos And Shall Remain Effective For One Year From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity, And Returned Only After The Lapse Of Said One Year Period. 12.8. In Case Of Structural Defects/failure Occurring During The Applicable Warranty Period Provided In Gcc Clause 12.5, The Procuring Entity Shall Undertake The Necessary Restoration Or Reconstruction Works And Shall Be Entitled To Full Reimbursement By The Parties Found To Be Liable For Expenses Incurred Therein Upon Demand, Without Prejudice To The Filing Of Appropriate Administrative, Civil, And/or Criminal Charges Against The Responsible Persons As Well As The Forfeiture Of The Warranty Security Posted In Favor Of The Procuring Entity. 13. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. 14. Procuring Entity’s Risk 14.1. From The Start Date Until The Certificate Of Final Acceptance Has Been Issued, The Following Are Risks Of The Procuring Entity: (a) The Risk Of Personal Injury, Death, Or Loss Of Or Damage To Property (excluding The Works, Plant, Materials, And Equipment), Which Are Due To: (i) Any Type Of Use Or Occupation Of The Site Authorized By The Procuring Entity After The Official Acceptance Of The Works; Or (ii) Negligence, Breach Of Statutory Duty, Or Interference With Any Legal Right By The Procuring Entity Or By Any Person Employed By Or Contracted To Him Except The Contractor. (b) The Risk Of Damage To The Works, Plant, Materials, And Equipment To The Extent That It Is Due To A Fault Of The Procuring Entity Or In The Procuring Entity’s Design, Or Due To War Or Radioactive Contamination Directly Affecting The Country Where The Works Are To Be Executed. 15. Insurance 15.1. The Contractor Shall, Under His Name And At His Own Expense, Obtain And Maintain, For The Duration Of This Contract, The Following Insurance Coverage: (a) Contractor’s All Risk Insurance; (b) Transportation To The Project Site Of Equipment, Machinery, And Supplies Owned By The Contractor; (c) Personal Injury Or Death Of Contractor’s Employees; And (d) Comprehensive Insurance For Third Party Liability To Contractor’s Direct Or Indirect Act Or Omission Causing Damage To Third Persons. 15.2. The Contractor Shall Provide Evidence To The Procuring Entity’s Representative That The Insurances Required Under This Contract Have Been Effected And Shall, Within A Reasonable Time, Provide Copies Of The Insurance Policies To The Procuring Entity’s Representative. Such Evidence And Such Policies Shall Be Provided To The Procuring Entity’s Through The Procuring Entity’s Representative. 15.3. The Contractor Shall Notify The Insurers Of Changes In The Nature, Extent, Or Program For The Execution Of The Works And Ensure The Adequacy Of The Insurances At All Times In Accordance With The Terms Of This Contract And Shall Produce To The Procuring Entity’s Representative The Insurance Policies In Force Including The Receipts For Payment Of The Current Premiums. The Above Insurance Policies Shall Be Obtained From Any Reputable Insurance Company Approved By The Procuring Entity’s Representative. 15.4. If The Contractor Fails To Obtain And Keep In Force The Insurances Referred To Herein Or Any Other Insurance Which He May Be Required To Obtain Under The Terms Of This Contract, The Procuring Entity May Obtain And Keep In Force Any Such Insurances And Pay Such Premiums As May Be Necessary For The Purpose. From Time To Time, The Procuring Entity May Deduct The Amount It Shall Pay For Said Premiums Including Twenty Five Percent (25%) Therein From Any Monies Due, Or Which May Become Due, To The Contractor, Without Prejudice To The Procuring Entity Exercising Its Right To Impose Other Sanctions Against The Contractor Pursuant To The Provisions Of This Contract. 15.5. In The Event The Contractor Fails To Observe The Above Safeguards, The Procuring Entity May, At The Contractor’s Expense, Take Whatever Measure Is Deemed Necessary For Its Protection And That Of The Contractor’s Personnel And Third Parties, And/or Order The Interruption Of Dangerous Works. In Addition, The Procuring Entity May Refuse To Make The Payments Under Gcc Clause 40 Until The Contractor Complies With This Clause. 15.6. The Contractor Shall Immediately Replace The Insurance Policy Obtained As Required In This Contract, Without Need Of The Procuring Entity’s Demand, With A New Policy Issued By A New Insurance Company Acceptable To The Procuring Entity For Any Of The Following Grounds: (a) The Issuer Of The Insurance Policy To Be Replaced Has: (i) Become Bankrupt; (ii) Been Placed Under Receivership Or Under A Management Committee; (iii) Been Sued For Suspension Of Payment; Or (iv) Been Suspended By The Insurance Commission And Its License To Engage In Business Or Its Authority To Issue Insurance Policies Cancelled; Or (v) Where Reasonable Grounds Exist That The Insurer May Not Be Able, Fully And Promptly, To Fulfill Its Obligation Under The Insurance Policy. 16. Termination For Default Of Contractor 16.1. The Procuring Entity Shall Terminate This Contract For Default When Any Of The Following Conditions Attend Its Implementation: 16.2. Due To The Contractor’s Fault And While The Project Is On-going, It Has Incurred Negative Slippage Of Fifteen Percent (15%) Or More In Accordance With Presidential Decree 1870, Regardless Of Whether Or Not Previous Warnings And Notices Have Been Issued For The Contractor To Improve His Performance; 16.3. Due To Its Own Fault And After This Contract Time Has Expired, The Contractor Incurs Delay In The Completion Of The Work After This Contract Has Expired; Or 16.4. The Contractor: (a) Abandons The Contract Works, Refuses Or Fails To Comply With A Valid Instruction Of The Procuring Entity Or Fails To Proceed Expeditiously And Without Delay Despite A Written Notice By The Procuring Entity; (b) Does Not Actually Have On The Project Site The Minimum Essential Equipment Listed On The Bid Necessary To Prosecute The Works In Accordance With The Approved Program Of Work And Equipment Deployment Schedule As Required For The Project; (c) Does Not Execute The Works In Accordance With This Contract Or Persistently Or Flagrantly Neglects To Carry Out Its Obligations Under This Contract; (d) Neglects Or Refuses To Remove Materials Or To Perform A New Work That Has Been Rejected As Defective Or Unsuitable; Or (e) Sub-lets Any Part Of This Contract Without Approval By The Procuring Entity. 16.5. All Materials On The Site, Plant, Equipment, And Works Shall Be Deemed To Be The Property Of The Procuring Entity If This Contract Is Rescinded Because Of The Contractor’s Default. 17. Termination For Default Of Procuring Entity The Contractor May Terminate This Contract With The Procuring Entity If The Works Are Completely Stopped For A Continuous Period Of At Least Sixty (60) Calendar Days Through No Fault Of Its Own, Due To Any Of The Following Reasons: (a) Failure Of The Procuring Entity To Deliver, Within A Reasonable Time, Supplies, Materials, Right-of-way, Or Other Items It Is Obligated To Furnish Under The Terms Of This Contract; Or (b) The Prosecution Of The Work Is Disrupted By The Adverse Peace And Order Situation, As Certified By The Armed Forces Of The Philippines Provincial Commander And Approved By The Secretary Of National Defense. 18. Termination For Other Causes 18.1. The Procuring Entity May Terminate This Contract, In Whole Or In Part, At Any Time For Its Convenience. The Head Of The Procuring Entity May Terminate This Contract For The Convenience Of The Procuring Entity If He Has Determined The Existence Of Conditions That Make Project Implementation Economically, Financially Or Technically Impractical And/or Unnecessary, Such As, But Not Limited To, Fortuitous Event(s) Or Changes In Law And National Government Policies. 18.2. The Procuring Entity Or The Contractor May Terminate This Contract If The Other Party Causes A Fundamental Breach Of This Contract. 18.3. Fundamental Breaches Of Contract Shall Include, But Shall Not Be Limited To, The Following: (a) The Contractor Stops Work For Twenty Eight (28) Days When No Stoppage Of Work Is Shown On The Current Program Of Work And The Stoppage Has Not Been Authorized By The Procuring Entity’s Representative; (b) The Procuring Entity’s Representative Instructs The Contractor To Delay The Progress Of The Works, And The Instruction Is Not Withdrawn Within Twenty Eight (28) Days; (c) The Procuring Entity Shall Terminate This Contract If The Contractor Is Declared Bankrupt Or Insolvent As Determined With Finality By A Court Of Competent Jurisdiction. In This Event, Termination Will Be Without Compensation To The Contractor, Provided That Such Termination Will Not Prejudice Or Affect Any Right Of Action Or Remedy Which Has Accrued Or Will Accrue Thereafter To The Procuring Entity And/or The Contractor. In The Case Of The Contractor's Insolvency, Any Contractor's Equipment Which The Procuring Entity Instructs In The Notice Is To Be Used Until The Completion Of The Works; (d) A Payment Certified By The Procuring Entity’s Representative Is Not Paid By The Procuring Entity To The Contractor Within Eighty Four (84) Days From The Date Of The Procuring Entity’s Representative’s Certificate; (e) The Procuring Entity’s Representative Gives Notice That Failure To Correct A Particular Defect Is A Fundamental Breach Of Contract And The Contractor Fails To Correct It Within A Reasonable Period Of Time Determined By The Procuring Entity’s Representative; (f) The Contractor Does Not Maintain A Security, Which Is Required; (g) The Contractor Has Delayed The Completion Of The Works By The Number Of Days For Which The Maximum Amount Of Liquidated Damages Can Be Paid, As Defined In The Gcc Clause 9; And (h) In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To, The Following: (i) Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Defined In Itb Clause 3.1(a), Unless Otherwise Specified In The Scc; (ii) Drawing Up Or Using Forged Documents; (iii) Using Adulterated Materials, Means Or Methods, Or Engaging In Production Contrary To Rules Of Science Or The Trade; And (iv) Any Other Act Analogous To The Foregoing. 18.4. The Funding Source Or The Procuring Entity, As Appropriate, Will Seek To Impose The Maximum Civil, Administrative And/or Criminal Penalties Available Under The Applicable Law On Individuals And Organizations Deemed To Be Involved With Corrupt, Fraudulent, Or Coercive Practices. 18.5. When Persons From Either Party To This Contract Gives Notice Of A Fundamental Breach To The Procuring Entity’s Representative In Order To Terminate The Existing Contract For A Cause Other Than Those Listed Under Gcc Clause 18.3, The Procuring Entity’s Representative Shall Decide Whether The Breach Is Fundamental Or Not. 18.6. If This Contract Is Terminated, The Contractor Shall Stop Work Immediately, Make The Site Safe And Secure, And Leave The Site As Soon As Reasonably Possible. 19. Procedures For Termination Of Contracts 19.1. The Following Provisions Shall Govern The Procedures For The Termination Of This Contract: (a) Upon Receipt Of A Written Report Of Acts Or Causes Which May Constitute Ground(s) For Termination As Aforementioned, Or Upon Its Own Initiative, The Procuring Entity Shall, Within A Period Of Seven (7) Calendar Days, Verify The Existence Of Such Ground(s) And Cause The Execution Of A Verified Report, With All Relevant Evidence Attached; (b) Upon Recommendation By The Procuring Entity, The Head Of The Procuring Entity Shall Terminate This Contract Only By A Written Notice To The Contractor Conveying The Termination Of This Contract. The Notice Shall State: (i) That This Contract Is Being Terminated For Any Of The Ground(s) Afore-mentioned, And A Statement Of The Acts That Constitute The Ground(s) Constituting The Same; (ii) The Extent Of Termination, Whether In Whole Or In Part; (iii) An Instruction To The Contractor To Show Cause As To Why This Contract Should Not Be Terminated; And (iv) Special Instructions Of The Procuring Entity, If Any. The Notice To Terminate Shall Be Accompanied By A Copy Of The Verified Report; (c) Within A Period Of Seven (7) Calendar Days From Receipt Of The Notice Of Termination, The Contractor Shall Submit To The Head Of The Procuring Entity A Verified Position Paper Stating Why The Contract Should Not Be Terminated. If The Contractor Fails To Show Cause After The Lapse Of The Seven (7) Day Period, Either By Inaction Or By Default, The Head Of The Procuring Entity Shall Issue An Order Terminating The Contract; (d) The Procuring Entity May, At Anytime Before Receipt Of The Bidder’s Verified Position Paper Described In Item (c) Above Withdraw The Notice To Terminate If It Is Determined That Certain Items Or Works Subject Of The Notice Had Been Completed, Delivered, Or Performed Before The Contractor’s Receipt Of The Notice; (e) Within A Non-extendible Period Of Ten (10) Calendar Days From Receipt Of The Verified Position Paper, The Head Of The Procuring Entity Shall Decide Whether Or Not To Terminate This Contract. It Shall Serve A Written Notice To The Contractor Of Its Decision And, Unless Otherwise Provided In The Said Notice, This Contract Is Deemed Terminated From Receipt Of The Contractor Of The Notice Of Decision. The Termination Shall Only Be Based On The Ground(s) Stated In The Notice To Terminate; And (f) The Head Of The Procuring Entity May Create A Contract Termination Review Committee (ctrc) To Assist Him In The Discharge Of This Function. All Decisions Recommended By The Ctrc Shall Be Subject To The Approval Of The Head Of The Procuring Entity. 19.2. Pursuant To Section 69(f) Of Ra 9184 And Without Prejudice To The Imposition Of Additional Administrative Sanctions As The Internal Rules Of The Agency May Provide And/or Further Criminal Prosecution As Provided By Applicable Laws, The Procuring Entity Shall Impose On Contractors After The Termination Of The Contract The Penalty Of Suspension For One (1) Year For The First Offense, Suspension For Two (2) Years For The Second Offense From Participating In The Public Bidding Process, For Violations Committed During The Contract Implementation Stage, Which Include But Not Limited To The Following: (a) Failure Of The Contractor, Due Solely To His Fault Or Negligence, To Mobilize And Start Work Or Performance Within The Specified Period In The Notice To Proceed (“ntp”); (b) Failure By The Contractor To Fully And Faithfully Comply With Its Contractual Obligations Without Valid Cause, Or Failure By The Contractor To Comply With Any Written Lawful Instruction Of The Procuring Entity Or Its Representative(s) Pursuant To The Implementation Of The Contract. For The Procurement Of Infrastructure Projects Or Consultancy Contracts, Lawful Instructions Include But Are Not Limited To The Following: (i) Employment Of Competent Technical Personnel, Competent Engineers And/or Work Supervisors; (ii) Provision Of Warning Signs And Barricades In Accordance With Approved Plans And Specifications And Contract Provisions; (iii) Stockpiling In Proper Places Of All Materials And Removal From The Project Site Of Waste And Excess Materials, Including Broken Pavement And Excavated Debris In Accordance With Approved Plans And Specifications And Contract Provisions; (iv) Deployment Of Committed Equipment, Facilities, Support Staff And Manpower; And (v) Renewal Of The Effectivity Dates Of The Performance Security After Its Expiration During The Course Of Contract Implementation. (c) Assignment And Subcontracting Of The Contract Or Any Part Thereof Or Substitution Of Key Personnel Named In The Proposal Without Prior Written Approval By The Procuring Entity. (d) Poor Performance By The Contractor Or Unsatisfactory Quality And/or Progress Of Work Arising From His Fault Or Negligence As Reflected In The Constructor's Performance Evaluation System (“cpes”) Rating Sheet. In The Absence Of The Cpes Rating Sheet, The Existing Performance Monitoring System Of The Procuring Entity Shall Be Applied. Any Of The Following Acts By The Contractor Shall Be Construed As Poor Performance: (i) Negative Slippage Of 15% And Above Within The Critical Path Of The Project Due Entirely To The Fault Or Negligence Of The Contractor; And (ii) Quality Of Materials And Workmanship Not Complying With The Approved Specifications Arising From The Contractor's Fault Or Negligence. (e) Willful Or Deliberate Abandonment Or Non-performance Of The Project Or Contract By The Contractor Resulting To Substantial Breach Thereof Without Lawful And/or Just Cause. In Addition To The Penalty Of Suspension, The Performance Security Posted By The Contractor Shall Also Be Forfeited. 20. Force Majeure, Release From Performance 20.1. For Purposes Of This Contract The Terms “force Majeure” And “fortuitous Event” May Be Used Interchangeably. In This Regard, A Fortuitous Event Or Force Majeure Shall Be Interpreted To Mean An Event Which The Contractor Could Not Have Foreseen, Or Which Though Foreseen, Was Inevitable. It Shall Not Include Ordinary Unfavorable Weather Conditions; And Any Other Cause The Effects Of Which Could Have Been Avoided With The Exercise Of Reasonable Diligence By The Contractor. 20.2. If This Contract Is Discontinued By An Outbreak Of War Or By Any Other Event Entirely Outside The Control Of Either The Procuring Entity Or The Contractor, The Procuring Entity’s Representative Shall Certify That This Contract Has Been Discontinued. The Contractor Shall Make The Site Safe And Stop Work As Quickly As Possible After Receiving This Certificate And Shall Be Paid For All Works Carried Out Before Receiving It And For Any Work Carried Out Afterwards To Which A Commitment Was Made. 20.3. If The Event Continues For A Period Of Eighty Four (84) Days, Either Party May Then Give Notice Of Termination, Which Shall Take Effect Twenty Eight (28) Days After The Giving Of The Notice. 20.4. After Termination, The Contractor Shall Be Entitled To Payment Of The Unpaid Balance Of The Value Of The Works Executed And Of The Materials And Plant Reasonably Delivered To The Site, Adjusted By The Following: (a) Any Sum To Which The Contractor Is Entitled Under Gcc Clause 28; (b) The Cost Of His Suspension And Demobilization; (c) Any Sum To Which The Procuring Entity Is Entitled. 20.5. The Net Balance Due Shall Be Paid Or Repaid Within A Reasonable Time Period From The Time Of The Notice Of Termination. 21. Resolution Of Disputes 21.1. If Any Dispute Or Difference Of Any Kind Whatsoever Shall Arise Between The Parties In Connection With The Implementation Of The Contract Covered By The Act And This Irr, The Parties Shall Make Every Effort To Resolve Amicably Such Dispute Or Difference By Mutual Consultation. 21.2. If The Contractor Believes That A Decision Taken By The Procuring Entity’s Representative Was Either Outside The Authority Given To The Procuring Entity’s Representative By This Contract Or That The Decision Was Wrongly Taken, The Decision Shall Be Referred To The Arbiter Indicated In The Scc Within Fourteen (14) Days Of The Notification Of The Procuring Entity’s Representative’s Decision. 21.3. Any And All Disputes Arising From The Implementation Of This Contract Covered By The R.a. 9184 And Its Irr Shall Be Submitted To Arbitration In The Philippines According To The Provisions Of Republic Act No. 876, Otherwise Known As The “ Arbitration Law” And Republic Act 9285, Otherwise Known As The “alternative Dispute Resolution Act Of 2004”: Provided, However, That, Disputes That Are Within The Competence Of The Construction Industry Arbitration Commission To Resolve Shall Be Referred Thereto. The Process Of Arbitration Shall Be Incorporated As A Provision In This Contract That Will Be Executed Pursuant To The Provisions Of The Act And Its Irr: Provided, Further, That, By Mutual Agreement, The Parties May Agree In Writing To Resort To Other Alternative Modes Of Dispute Resolution. 22. Suspension Of Loan, Credit, Grant, Or Appropriation In The Event That The Funding Source Suspends The Loan, Credit, Grant, Or Appropriation To The Procuring Entity, From Which Part Of The Payments To The Contractor Are Being Made: (a) The Procuring Entity Is Obligated To Notify The Contractor Of Such Suspension Within Seven (7) Days Of Having Received The Suspension Notice. (b) If The Contractor Has Not Received Sums Due It For Work Already Done Within Forty Five (45) Days From The Time The Contractor’s Claim For Payment Has Been Certified By The Procuring Entity’s Representative, The Contractor May Immediately Issue A Suspension Of Work Notice In Accordance With Gcc Clause 45.2. 23. Procuring Entity’s Representative’s Decisions 23.1. Except Where Otherwise Specifically Stated, The Procuring Entity’s Representative Will Decide Contractual Matters Between The Procuring Entity And The Contractor In The Role Representing The Procuring Entity. 23.2. The Procuring Entity’s Representative May Delegate Any Of His Duties And Responsibilities To Other People, Except To The Arbiter, After Notifying The Contractor, And May Cancel Any Delegation After Notifying The Contractor. 24. Approval Of Drawings And Temporary Works By The Procuring Entity’s Representative 24.1. All Drawings Prepared By The Contractor For The Execution Of The Temporary Works, Are Subject To Prior Approval By The Procuring Entity’s Representative Before Its Use. 24.2. The Contractor Shall Be Responsible For Design Of Temporary Works. 24.3. The Procuring Entity’s Representative’s Approval Shall Not Alter The Contractor’s Responsibility For Design Of The Temporary Works. 24.4. The Contractor Shall Obtain Approval Of Third Parties To The Design Of The Temporary Works, When Required By The Procuring Entity. 25. Acceleration And Delays Ordered By The Procuring Entity’s Representative 25.1. When The Procuring Entity Wants The Contractor To Finish Before The Intended Completion Date, The Procuring Entity’s Representative Will Obtain Priced Proposals For Achieving The Necessary Acceleration From The Contractor. If The Procuring Entity Accepts These Proposals, The Intended Completion Date Will Be Adjusted Accordingly And Confirmed By Both The Procuring Entity And The Contractor. 25.2. If The Contractor’s Financial Proposals For An Acceleration Are Accepted By The Procuring Entity, They Are Incorporated In The Contract Price And Treated As A Variation. 26. Extension Of The Intended Completion Date 26.1. The Procuring Entity’s Representative Shall Extend The Intended Completion Date If A Variation Is Issued Which Makes It Impossible For The Intended Completion Date To Be Achieved By The Contractor Without Taking Steps To Accelerate The Remaining Work, Which Would Cause The Contractor To Incur Additional Costs. No Payment Shall Be Made For Any Event Which May Warrant The Extension Of The Intended Completion Date. 26.2. The Procuring Entity’s Representative Shall Decide Whether And By How Much To Extend The Intended Completion Date Within Twenty One (21) Days Of The Contractor Asking The Procuring Entity’s Representative For A Decision Thereto After Fully Submitting All Supporting Information. If The Contractor Has Failed To Give Early Warning Of A Delay Or Has Failed To Cooperate In Dealing With A Delay, The Delay By This Failure Shall Not Be Considered In Assessing The New Intended Completion Date. 27. Right To Vary 27.1. The Procuring Entity’s Representative With The Prior Approval Of The Procuring Entity May Instruct Variations, Up To A Maximum Cumulative Amount Of Ten Percent (10%) Of The Original Contract Cost. 27.2. Variations Shall Be Valued As Follows: (a) At A Lump Sum Price Agreed Between The Parties; (b) Where Appropriate, At Rates In This Contract; (c) In The Absence Of Appropriate Rates, The Rates In This Contract Shall Be Used As The Basis For Valuation; Or Failing Which (d) At Appropriate New Rates, Equal To Or Lower Than Current Industry Rates And To Be Agreed Upon By Both Parties And Approved By The Head Of The Procuring Entity. 28. Contractor's Right To Claim If The Contractor Incurs Cost As A Result Of Any Of The Events Under Gcc Clause 13, The Contractor Shall Be Entitled To The Amount Of Such Cost. If As A Result Of Any Of The Said Events, It Is Necessary To Change The Works, This Shall Be Dealt With As A Variation. 29. Dayworks 29.1. Subject To Gcc Clause 43 On Variation Order, And If Applicable As Indicated In The Scc, The Day Works Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 29.2. All Work To Be Paid For As Day Works Shall Be Recorded By The Contractor On Forms Approved By The Procuring Entity’s Representative. Each Completed Form Shall Be Verified And Signed By The Procuring Entity’s Representative Within Two Days Of The Work Being Done. 29.3. The Contractor Shall Be Paid For Day Works Subject To Obtaining Signed Dayworks Forms. 30. Early Warning 30.1. The Contractor Shall Warn The Procuring Entity’s Representative At The Earliest Opportunity Of Specific Likely Future Events Or Circumstances That May Adversely Affect The Quality Of The Work, Increase The Contract Price, Or Delay The Execution Of The Works. The Procuring Entity’s Representative May Require The Contractor To Provide An Estimate Of The Expected Effect Of The Future Event Or Circumstance On The Contract Price And Completion Date. The Estimate Shall Be Provided By The Contractor As Soon As Reasonably Possible. 30.2. The Contractor Shall Cooperate With The Procuring Entity’s Representative In Making And Considering Proposals For How The Effect Of Such An Event Or Circumstance Can Be Avoided Or Reduced By Anyone Involved In The Work And In Carrying Out Any Resulting Instruction Of The Procuring Entity’s Representative. 31. Program Of Work 31.1. Within The Time Stated In The Scc, The Contractor Shall Submit To The Procuring Entity’s Representative For Approval A Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. 31.2. An Update Of The Program Of Work Shall The Show The Actual Progress Achieved On Each Activity And The Effect Of The Progress Achieved On The Timing Of The Remaining Work, Including Any Changes To The Sequence Of The Activities. 31.3. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 31.4. The Procuring Entity’s Representative’s Approval Of The Program Of Work Shall Not Alter The Contractor’s Obligations. The Contractor May Revise The Program Of Work And Submit It To The Procuring Entity’s Representative Again At Any Time. A Revised Program Of Work Shall Show The Effect Of Any Approved Variations. 31.5. When The Program Of Work Is Updated, The Contractor Shall Provide The Procuring Entity’s Representative With An Updated Cash Flow Forecast. The Cash Flow Forecast Shall Include Different Currencies, As Defined In The Contract, Converted As Necessary Using The Contract Exchange Rates. 31.6. All Variations Shall Be Included In Updated Program Of Work Produced By The Contractor. 32. Management Conferences 32.1. Either The Procuring Entity’s Representative Or The Contractor May Require The Other To Attend A Management Conference. The Management Conference Shall Review The Plans For Remaining Work And Deal With Matters Raised In Accordance With The Early Warning Procedure. 32.2. The Procuring Entity’s Representative Shall Record The Business Of Management Conferences And Provide Copies Of The Record To Those Attending The Conference And To The Procuring Entity . The Responsibility Of The Parties For Actions To Be Taken Shall Be Decided By The Procuring Entity’s Representative Either At The Management Conference Or After The Management Conference And Stated In Writing To All Who Attended The Conference. 33. Bill Of Quantities 33.1. The Bill Of Quantities Shall Contain Items Of Work For The Construction, Installation, Testing, And Commissioning Of Work To Be Done By The Contractor. 33.2. The Bill Of Quantities Is Used To Calculate The Contract Price. The Contractor Is Paid For The Quantity Of The Work Done At The Rate In The Bill Of Quantities For Each Item. 33.3. If The Final Quantity Of Any Work Done Differs From The Quantity In The Bill Of Quantities For The Particular Item And Is Not More Than Twenty Five Percent (25%) Of The Original Quantity, Provided The Aggregate Changes For All Items Do Not Exceed Ten Percent (10%) Of The Contract Price, The Procuring Entity’s Representative Shall Make The Necessary Adjustments To Allow For The Changes Subject To Applicable Laws, Rules, And Regulations. 33.4. If Requested By The Procuring Entity’s Representative, The Contractor Shall Provide The Procuring Entity’s Representative With A Detailed Cost Breakdown Of Any Rate In The Bill Of Quantities. 34. Instructions, Inspections And Audits 34.1. The Procuring Entity’s Personnel Shall At All Reasonable Times During Construction Of The Work Be Entitled To Examine, Inspect, Measure And Test The Materials And Workmanship, And To Check The Progress Of The Construction. 34.2. If The Procuring Entity’s Representative Instructs The Contractor To Carry Out A Test Not Specified In The Specification To Check Whether Any Work Has A Defect And The Test Shows That It Does, The Contractor Shall Pay For The Test And Any Samples. If There Is No Defect, The Test Shall Be A Compensation Event. 34.3. The Contractor Shall Permit The Funding Source Named In The Scc To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Appointed By The Funding Source, If So Required By The Funding Source. 35. Identifying Defects The Procuring Entity’s Representative Shall Check The Contractor’s Work And Notify The Contractor Of Any Defects That Are Found. Such Checking Shall Not Affect The Contractor’s Responsibilities. The Procuring Entity’s Representative May Instruct The Contractor To Search Uncover Defects And Test Any Work That The Procuring Entity’s Representative Considers Below Standards And Defective. 36. Cost Of Repairs Loss Or Damage To The Works Or Materials To Be Incorporated In The Works Between The Start Date And The End Of The Defects Liability Periods Shall Be Remedied By The Contractor At The Contractor’s Cost If The Loss Or Damage Arises From The Contractor’s Acts Or Omissions. 37. Correction Of Defects 37.1. The Procuring Entity’s Representative Shall Give Notice To The Contractor Of Any Defects Before The End Of The Defects Liability Period, Which Isone (1) Year From Project Completion Up To Final Acceptance By The Procuring Entity’s. 37.2. Every Time Notice Of A Defect Is Given, The Contractor Shall Correct The Notified Defect Within The Length Of Time Specified In The Procuring Entity’s Representative’s Notice. 37.3. The Contractor Shall Correct The Defects Which He Notices Himself Before The End Of The Defects Liability Period. 37.4. The Procuring Entity Shall Certify That All Defects Have Been Corrected. If The Procuring Entity Considers That Correction Of A Defect Is Not Essential, He Can Request The Contractor To Submit A Quotation For The Corresponding Reduction In The Contract Price. If The Procuring Entity Accepts The Quotation, The Corresponding Change In The Scc Is A Variation. 38. Uncorrected Defects 38.1. The Procuring Entity Shall Give The Contractor At Least Fourteen (14) Days Notice Of His Intention To Use A Third Party To Correct A Defect. If The Contractor Does Not Correct The Defect Himself Within The Period, The Procuring Entity May Have The Defect Corrected By The Third Party. The Cost Of The Correction Will Be Deducted From The Contract Price. 38.2. The Use Of A Third Party To Correct Defects That Are Uncorrected By The Contractor Will In No Way Relieve The Contractor Of Its Liabilities And Warranties Under The Contract. 39. Advance Payment 39.1. The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum Or, At The Most Two, Installments According To A Schedule Specified In The Scc. 39.2. The Advance Payment Shall Be Made Only Upon The Submission To And Acceptance By The Procuring Entity Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, A Bank Guarantee Or A Surety Bond Callable Upon Demand, Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission And Confirmed By The Procuring Entity. 39.3. The Advance Payment Shall Be Repaid By The Contractor By An Amount Equal To The Percentage Of The Total Contract Price Used For The Advance Payment. 39.4. The Contractor May Reduce His Standby Letter Of Credit Or Guarantee Instrument By The Amounts Refunded By The Monthly Certificates In The Advance Payment. 39.5. The Procuring Entity Will Provide An Advance Payment On The Contract Price As Stipulated In The Conditions Of Contract, Subject To The Maximum Amount Stated In Scc Clause 39.1. 40. Progress Payments 40.1. The Contractor May Submit A Request For Payment For Work Accomplished. Such Request For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 40.2. The Procuring Entity Shall Deduct The Following From The Certified Gross Amounts To Be Paid To The Contractor As Progress Payment: (a) Cumulative Value Of The Work Previously Certified And Paid For. (b) Portion Of The Advance Payment To Be Recouped For The Month. (c) Retention Money In Accordance With The Condition Of Contract. (d) Amount To Cover Third Party Liabilities. (e) Amount To Cover Uncorrected Discovered Defects In The Works. 40.3. Payments Shall Be Adjusted By Deducting There From The Amounts For Advance Payments And Retention. The Procuring Entity Shall Pay The Contractor The Amounts Certified By The Procuring Entity’s Representative Within Twenty Eight (28) Days From The Date Each Certificate Was Issued. No Payment Of Interest For Delayed Payments And Adjustments Shall Be Made By The Procuring Entity. 40.4. The First Progress Payment May Be Paid By The Procuring Entity To The Contractor Provided That At Least Twenty Percent (20%) Of The Work Has Been Accomplished As Certified By The Procuring Entity’s Representative. 40.5. Items Of The Works For Which A Price Of “0” (zero) Has Been Entered Will Not Be Paid For By The Procuring Entity And Shall Be Deemed Covered By Other Rates And Prices In The Contract. 41. Payment Certificates 41.1. The Contractor Shall Submit To The Procuring Entity’s Representative Monthly Statements Of The Estimated Value Of The Work Executed Less The Cumulative Amount Certified Previously. 41.2. The Procuring Entity’s Representative Shall Check The Contractor’s Monthly Statement And Certify The Amount To Be Paid To The Contractor. 41.3. The Value Of Work Executed Shall: (a) Be Determined By The Procuring Entity’s Representative; (b) Comprise The Value Of The Quantities Of The Items In The Bill Of Quantities Completed; And (c) Include The Valuations Of Approved Variations. 41.4. The Procuring Entity’s Representative May Exclude Any Item Certified In A Previous Certificate Or Reduce The Proportion Of Any Item Previously Certified In Any Certificate In The Light Of Later Information. 42. Retention 42.1. The Procuring Entity Shall Retain From Each Payment Due To The Contractor An Amount Equal To A Percentage Thereof Using The Rate As Specified In Itb Sub-clause 42.2. 42.2. Progress Payments Are Subject To Retention Of Ten Percent (10%), Referred To As The “retention Money.” Such Retention Shall Be Based On The Total Amount Due To The Contractor Prior To Any Deduction And Shall Be Retained From Every Progress Payment Until Fifty Percent (50%) Of The Value Of Works, As Determined By The Procuring Entity, Are Completed. If, After Fifty Percent (50%) Completion, The Work Is Satisfactorily Done And On Schedule, No Additional Retention Shall Be Made; Otherwise, The Ten Percent (10%) Retention Shall Again Be Imposed Using The Rate Specified Therefore. 42.3. The Total “retention Money” Shall Be Due For Release Upon Final Acceptance Of The Works. The Contractor May, However, Request The Substitution Of The Retention Money For Each Progress Billing With Irrevocable Standby Letters Of Credit From A Commercial Bank, Bank Guarantees Or Surety Bonds Callable On Demand, Of Amounts Equivalent To The Retention Money Substituted For And Acceptable To The Procuring Entity, Provided That The Project Is On Schedule And Is Satisfactorily Undertaken. Otherwise, The Ten (10%) Percent Retention Shall Be Made. Said Irrevocable Standby Letters Of Credit, Bank Guarantees And/or Surety Bonds, To Be Posted In Favor Of The Government Shall Be Valid For A Duration To Be Determined By The Concerned Implementing Office/agency Or Procuring Entity And Will Answer For The Purpose For Which The Ten (10%) Percent Retention Is Intended, I.e., To Cover Uncorrected Discovered Defects And Third Party Liabilities. 42.4. On Completion Of The Whole Works, The Contractor May Substitute Retention Money With An “on Demand” Bank Guarantee In A Form Acceptable To The Procuring Entity. 43. Variation Orders 43.1. Variation Orders May Be Issued By The Procuring Entity To Cover Any Increase/decrease In Quantities, Including The Introduction Of New Work Items That Are Not Included In The Original Contract Or Reclassification Of Work Items That Are Either Due To Change Of Plans, Design Or Alignment To Suit Actual Field Conditions Resulting In Disparity Between The Preconstruction Plans Used For Purposes Of Bidding And The “as Staked Plans” Or Construction Drawings Prepared After A Joint Survey By The Contractor And The Procuring Entity After Award Of The Contract, Provided That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. The Addition/deletion Of Works Should Be Within The General Scope Of The Project As Bid And Awarded. The Scope Of Works Shall Not Be Reduced So As To Accommodate A Positive Variation Order. A Variation Order May Either Be In The Form Of A Change Order Or Extra Work Order. 43.2. A Change Order May Be Issued By The Procuring Entity To Cover Any Increase/decrease In Quantities Of Original Work Items In The Contract. 43.3. An Extra Work Order May Be Issued By The Procuring Entity To Cover The Introduction Of New Work Necessary For The Completion, Improvement Or Protection Of The Project Which Were Not Included As Items Of Work In The Original Contract, Such As, Where There Are Subsurface Or Latent Physical Conditions At The Site Differing Materially From Those Indicated In The Contract, Or Where There Are Duly Unknown Physical Conditions At The Site Of An Unusual Nature Differing Materially From Those Ordinarily Encountered And Generally Recognized As Inherent In The Work Or Character Provided For In The Contract. 43.4. Any Cumulative Variation Order Beyond Ten Percent (10%) Shall Be Subject Of Another Contract To Be Bid Out If The Works Are Separable From The Original Contract. In Exceptional Cases Where It Is Urgently Necessary To Complete The Original Scope Of Work, The Head Of The Procuring Entity May Authorize A Positive Variation Order Go Beyond Ten Percent (10%) But Not More Than Twenty Percent (20%) Of The Original Contract Price, Subject To The Guidelines To Be Determined By The Gppb: Provided, However, That Appropriate Sanctions Shall Be Imposed On The Designer, Consultant Or Official Responsible For The Original Detailed Engineering Design Which Failed To Consider The Variation Order Beyond Ten Percent (10%). 43.5. In Claiming For Any Variation Order, The Contractor Shall, Within Seven (7) Calendar Days After Such Work Has Been Commenced Or After The Circumstances Leading To Such Condition(s) Leading To The Extra Cost, And Within Twenty-eight (28) Calendar Days Deliver A Written Communication Giving Full And Detailed Particulars Of Any Extra Cost In Order That It May Be Investigated At That Time. Failure To Provide Either Of Such Notices In The Time Stipulated Shall Constitute A Waiver By The Contractor For Any Claim. The Preparation And Submission Of Variation Orders Are As Follows: (a) If The Procuring Entity’s Representative/project Engineer Believes That A Change Order Or Extra Work Order Should Be Issued, He Shall Prepare The Proposed Order Accompanied With The Notices Submitted By The Contractor, The Plans Therefore, His Computations As To The Quantities Of The Additional Works Involved Per Item Indicating The Specific Stations Where Such Works Are Needed, The Date Of His Inspections And Investigations Thereon, And The Log Book Thereof, And A Detailed Estimate Of The Unit Cost Of Such Items Of Work, Together With His Justifications For The Need Of Such Change Order Or Extra Work Order, And Shall Submit The Same To The Head Of The Procuring Entity For Approval. (b) The Head Of The Procuring Entity Or His Duly Authorized Representative, Upon Receipt Of The Proposed Change Order Or Extra Work Order Shall Immediately Instruct The Technical Staff Of The Procuring Entity’s To Conduct An On-the-spot Investigation To Verify The Need For The Work To Be Prosecuted. A Report Of Such Verification Shall Be Submitted Directly To The Head Of The Procuring Entity Or His Duly Authorized Representative. (c) The, Head Of The Procuring Entity Or His Duly Authorized Representative, After Being Satisfied That Such Change Order Or Extra Work Order Is Justified And Necessary, Shall Review The Estimated Quantities And Prices And Forward The Proposal With The Supporting Documentation To The Head Of Procuring Entity For Consideration. (d) If, After Review Of The Plans, Quantities And Estimated Unit Cost Of The Items Of Work Involved, The Proper Office Of The Procuring Entity Empowered To Review And Evaluate Change Orders Or Extra Work Orders Recommends Approval Thereof, Head Of The Procuring Entity Or His Duly Authorized Representative, Believing The Change Order Or Extra Work Order To Be In Order, Shall Approve The Same. (e) The Timeframe For The Processing Of Variation Orders From The Preparation Up To The Approval By The Head Of The Procuring Entity Concerned Shall Not Exceed Thirty (30) Calendar Days. 44. Contract Completion Once The Project Reaches An Accomplishment Of Ninety Five (95%) Of The Total Contract Amount, The Procuring Entity May Create An Inspectorate Team To Make Preliminary Inspection And Submit A Punch-list To The Contractor In Preparation For The Final Turnover Of The Project. Said Punch-list Will Contain, Among Others, The Remaining Works, Work Deficiencies For Necessary Corrections, And The Specific Duration/time To Fully Complete The Project Considering The Approved Remaining Contract Time. This, However, Shall Not Preclude The Claim Of The Procuring Entity For Liquidated Damages. 45. Suspension Of Work 45.1. The Procuring Entity Shall Have The Authority To Suspend The Work Wholly Or Partly By Written Order For Such Period As May Be Deemed Necessary, Due To Force Majeure Or Any Fortuitous Events Or For Failure On The Part Of The Contractor To Correct Bad Conditions Which Are Unsafe For Workers Or For The General Public, To Carry Out Valid Orders Given By The Procuring Entity Or To Perform Any Provisions Of The Contract, Or Due To Adjustment Of Plans To Suit Field Conditions As Found Necessary During Construction. The Contractor Shall Immediately Comply With Such Order To Suspend The Work Wholly Or Partly. 45.2. The Contractor Or Its Duly Authorized Representative Shall Have The Right To Suspend Work Operation On Any Or All Projects/activities Along The Critical Path Of Activities After Fifteen (15) Calendar Days From Date Of Receipt Of Written Notice From The Contractor To The District Engineer/regional Director/consultant Or Equivalent Official, As The Case May Be, Due To The Following: (a) There Exist Right-of-way Problems Which Prohibit The Contractor From Performing Work In Accordance With The Approved Construction Schedule. (b) Requisite Construction Plans Which Must Be Owner-furnished Are Not Issued To The Contractor Precluding Any Work Called For By Such Plans. (c) Peace And Order Conditions Make It Extremely Dangerous, If Not Possible, To Work. However, This Condition Must Be Certified In Writing By The Philippine National Police (pnp) Station Which Has Responsibility Over The Affected Area And Confirmed By The Department Of Interior And Local Government (dilg) Regional Director. (d) There Is Failure On The Part Of The Procuring Entity To Deliver Government-furnished Materials And Equipment As Stipulated In The Contract. (e) Delay In The Payment Of Contractor’s Claim For Progress Billing Beyond Forty-five (45) Calendar Days From The Time The Contractor’s Claim Has Been Certified To By The Procuring Entity’s Authorized Representative That The Documents Are Complete Unless There Are Justifiable Reasons Thereof Which Shall Be Communicated In Writing To The Contractor. 45.3. In Case Of Total Suspension, Or Suspension Of Activities Along The Critical Path, Which Is Not Due To Any Fault Of The Contractor, The Elapsed Time Between The Effective Order Of Suspending Operation And The Order To Resume Work Shall Be Allowed The Contractor By Adjusting The Contract Time Accordingly. 46. Payment On Termination 46.1. If The Contract Is Terminated Because Of A Fundamental Breach Of Contract By The Contractor, The Procuring Entity’s Representative Shall Issue A Certificate For The Value Of The Work Done And Materials Ordered Less Advance Payments Received Up To The Date Of The Issue Of The Certificate And Less The Percentage To Apply To The Value Of The Work Not Completed, As Indicated In The Scc. Additional Liquidated Damages Shall Not Apply. If The Total Amount Due To The Procuring Entity Exceeds Any Payment Due To The Contractor, The Difference Shall Be A Debt Payable To The Procuring Entity. 46.2. If The Contract Is Terminated For The Procuring Entity’s Convenience Or Because Of A Fundamental Breach Of Contract By The Procuring Entity, The Procuring Entity’s Representative Shall Issue A Certificate For The Value Of The Work Done, Materials Ordered, The Reasonable Cost Of Removal Of Equipment, Repatriation Of The Contractor’s Personnel Employed Solely On The Works, And The Contractor’s Costs Of Protecting And Securing The Works, And Less Advance Payments Received Up To The Date Of The Certificate. 46.3. The Net Balance Due Shall Be Paid Or Repaid Within Twenty Eight (28) Days From The Notice Of Termination. 46.4. If The Contractor Has Terminated The Contract Under Gcc Clauses 17 Or 18, The Procuring Entity Shall Promptly Return The Performance Security To The Contractor. 47. Extension Of Contract Time 47.1. Should The Amount Of Additional Work Of Any Kind Or Other Special Circumstances Of Any Kind Whatsoever Occur Such As To Fairly Entitle The Contractor To An Extension Of Contract Time, The Procuring Entity Shall Determine The Amount Of Such Extension; Provided That The Procuring Entity Is Not Bound To Take Into Account Any Claim For An Extension Of Time Unless The Contractor Has, Prior To The Expiration Of The Contract Time And Within Thirty (30) Calendar Days After Such Work Has Been Commenced Or After The Circumstances Leading To Such Claim Have Arisen, Delivered To The Procuring Entity Notices In Order That It Could Have Investigated Them At That Time. Failure To Provide Such Notice Shall Constitute A Waiver By The Contractor Of Any Claim. Upon Receipt Of Full And Detailed Particulars, The Procuring Entity Shall Examine The Facts And Extent Of The Delay And Shall Extend The Contract Time Completing The Contract Work When, In The Procuring Entity’s Opinion, The Findings Of Facts Justify An Extension. 47.2. No Extension Of Contract Time Shall Be Granted The Contractor Due To (a) Ordinary Unfavorable Weather Conditions And (b) Inexcusable Failure Or Negligence Of Contractor To Provide The Required Equipment, Supplies Or Materials. 47.3. Extension Of Contract Time May Be Granted Only When The Affected Activities Fall Within The Critical Path Of The Pert/cpm Network. 47.4. No Extension Of Contract Time Shall Be Granted When The Reason Given To Support The Request For Extension Was Already Considered In The Determination Of The Original Contract Time During The Conduct Of Detailed Engineering And In The Preparation Of The Contract Documents As Agreed Upon By The Parties Before Contract Perfection. 47.5. Extension Of Contract Time Shall Be Granted For Rainy/unworkable Days Considered Unfavorable For The Prosecution Of The Works At The Site, Based On The Actual Conditions Obtained At The Site, In Excess Of The Number Of Rainy/unworkable Days Pre-determined By The Procuring Entity In Relation To The Original Contract Time During The Conduct Of Detailed Engineering And In The Preparation Of The Contract Documents As Agreed Upon By The Parties Before Contract Perfection, And/or For Equivalent Period Of Delay Due To Major Calamities Such As Exceptionally Destructive Typhoons, Floods And Earthquakes, And Epidemics, And For Causes Such As Non-delivery On Time Of Materials, Working Drawings, Or Written Information To Be Furnished By The Procuring Entity, Non-acquisition Of Permit To Enter Private Properties Within The Right-of-way Resulting In Complete Paralyzation Of Construction Activities, And Other Meritorious Causes As Determined By The Procuring Entity’s Representative And Approved By The Head Of The Procuring Entity. Shortage Of Construction Materials, General Labor Strikes, And Peace And Order Problems That Disrupt Construction Operations Through No Fault Of The Contractor May Be Considered As Additional Grounds For Extension Of Contract Time Provided They Are Publicly Felt And Certified By Appropriate Government Agencies Such As Dti, Dole, Dilg, And Dnd, Among Others. The Written Consent Of Bondsmen Must Be Attached To Any Request Of The Contractor For Extension Of Contract Time And Submitted To The Procuring Entity For Consideration And The Validity Of The Performance Security Shall Be Correspondingly Extended. 48. Price Adjustment Except For Extraordinary Circumstances As Determined By Neda And Approved By The Gppb, No Price Adjustment Shall Be Allowed. Nevertheless, In Cases Where The Cost Of The Awarded Contract Is Affected By Any Applicable New Laws, Ordinances, Regulations, Or Other Acts Of The Gop, Promulgated After The Date Of Bid Opening, A Contract Price Adjustment Shall Be Made Or Appropriate Relief Shall Be Applied On A No Loss-no Gain Basis. 49. Completion The Contractor Shall Request The Procuring Entity’s Representative To Issue A Certificate Of Completion Of The Works, And The Procuring Entity’s Representative Will Do So Upon Deciding That The Work Is Completed. 50. Taking Over The Procuring Entity Shall Take Over The Site And The Works Within Seven (7) Days From The Date The Procuring Entity’s Representative Issues A Certificate Of Completion. 51. Operating And Maintenance Manuals 51.1. If “as Built” Drawings And/or Operating And Maintenance Manuals Are Required, The Contractor Shall Supply Them By The Dates Stated In The Scc. 51.2. If The Contractor Does Not Supply The Drawings And/or Manuals By The Dates Stated In The Scc, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative Shall Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Gcc Clause 1.16 The Intended Completion Date Is 120 Cd From Ntp. 1.21 The Procuring Entity Is Lgu- Mapanas, Northern Samar. 1.22 The Procuring Entity’s Representative Is Atty. Ronn Michael L. Tejano Municipal Mayor Municipality Of Mapanas Province Of Northern Samar 1.23 The Site Is Located At Mapanas, Northern Samar. 1.27 The Start Date Is: Upon Receipt Of Notice To Proceed. 1.30 The Works Consist Of: Item No. Scope Of Work Quantity Unit Rehabilitation Of Farm-to-market Road, Brgy. E. Laodenio, Mapanas, Northern Samar B.5 Project Billboard/sign Board 1.00 Each B.5 B.7(2) Occupational Safety And Health Program 1.00 Is B.7(2) B.9 Mobilization/demobilization 1.00 Is B.9 Part C Earthworks Part C 101(3)a.2 Removal Of Existing Pcc Pavement, 0.2m Thk, Pccp (for Reblocking At Intermittent Section) 1409.00 Sq.m. 101(3)a.2 102(2)b Surplus Common Excavation 420.00 Cu.m. 102(2)b 105(1) Subgrade Preparation (common Material) 1680.00 Sq.m. 105(1) Part D Subbase And Base Course Part D 200(1) Aggregate Subbase Course 267.50 Cu.m. 200(1) 201(1) Aggregate Base Course 336.00 Cu.m. 201(1) Part E Surface Courses Part E 311(1)a.2 Pcc Pavement (plain) Conventional Method, 200mm Thk. 1400.00 Sq.m. 311(1)a.2 2.2 Note: The Items To Follow 5.1 The Procuring Entity Shall Give Possession Of All Parts Of The Site To The Contractor Upon The Issuance Of Notice To Proceed. 6.5 The Contractor Shall Employ The Following Key Personnel: Key Personnel Number Civil Engineer 1 Construction Foreman 1 Labor Workers 3 7.4(c) “no Further Instructions”. 7.7 No Further Instructions. 8.1 No Further Instructions. 10 The Site Investigation Reports Are: None 12.3 No Further Instructions. 12.5 In Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures: Five (5) Years. 13 “no Additional Provision.” 18.3(h)(i) No Further Instructions. 21.2 The Arbiter Is: Construction Industry Arbitration Commission 29.1 No Day Works Are Applicable To The Contract. 31.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within 15days Of Delivery Of The Letter Of Acceptance. 31.3 The Period Between Program Of Work Updates Is 15days. The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is P 1,000.00. 34.3 The Funding Source Is Coming From Nia 39.1 The Amount Of The Advance Payment Is 15% Of The Contract Price (lump Sum) And Shall Be Release Once Upon Presentation Of The Following Documents As Required: 1. Letter Request For Advance Payment From The Contractor 2. Bank Guarantee For Advance Payment 40.1 Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Be Included For Payment. 51.1 The Date By Which Operating And Maintenance Manuals Are Required Is Not Applicable. The Date By Which “as Built” Drawings Are Required Is 20 Days Upon Completion Of The Subproject. 51.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is P1,000.00. Section Vi. Specifications Project Name: Rehabilitation Of Farm-to-market Road, Brgy. E. Laodenio, Mapanas, Northern Samar Location : Brgy. E. Laodenio, Mapanas, Northern Samar Item No. Description Qty. Unit. B.5 Project Billboard/signboard 1.00 Each Labor A. Construction Foreman 4.00 1 B. Skilled Laborer 4.00 1 C. Unskilled Laborer 4.00 2 F.1 Name And Specification Materials A. Tarpaulin (8’x8’) 1.00 Pc B. Coco Lumber 84.00 Bd.ft. C. Plywood Marine (0.0125mx1.2mx2.44m) 2.00 Pc D. Assorted Common Wire Nail 0.50 Kg B.7(2) Occupational Safety And Health Program 1.00 L.s A. Safety Practitioner (part Time) 23.00 1 B. B. Health Personnel (full Time) 90.00 1 B.1 Name And Capacity C. Equipment D. A. Safety Shoes 79.00 Man-day E. B. Safety Helmet 79.00 Man-day F. C. Safety/working Gloves 79.00 Man-day G. D. Safety Vest 79.00 Man-day H. E. Rubber Boots 79.00 Man-day F. Rain Coats (30% Of The Duration) Optional 24.00 Man-day B.9 Mobiilization/demobilization 1.00 L.s Name And Capacity Equipment A. Dump Truck (12 Cu. Yd.) 16.00 2 B. Payloader (1.5 Cu.m.), Lx80-2c 16.00 1 C. Bulldozer, D6h Series Ii Psds/dd 16.00 1 D. Backhoe W/ Breaker (0.80 Cu.m.) 16.00 1 101(3)a.2 Removal Of Existing Pcc Pavement, 0.2m Thk, Pccp (for Reblocking At Intermittent Section 1,409.00 Sq.m. A.1 Labor A. Construction Foreman 1.00 1 B. Unskilled Laborer 1.00 2 Equipment A. Backhoe W/ Breaker (0.80 Cu.m) 1.00 1 B. Payloader (1.50), Lx80 Cu.m. 1.00 1 C. Dump Truck (12 Cu. Yd.) 0.50 1 D. Concrete Saw (7.5 Hp), 14”blade Dia 0.50 1 Minor Tools (10% Of Labor Cost) F.1 Name And Specification A. Concrete Saw (diamond Blade 14” Dia) 0.00015 Pc 102(2)b Surplus Common Excavation 420.00 Cu.m. A.1 Labor A. Construction Foreman 1.00 1 B. Unskilled Laborer 1.00 2 B.1 Name And Capacity Equipment A. Bulldozer, D6h Series Ii Psds/dd 1.00 1 B. Payloader (1.5 Cu.m.) 1.00 1 C. Payloader (1.5 Cu.m.) 0.30 1 D. Dump Truck (12 Cu.yd.) 1.00 3 E. Back Hoe (0.80 Cu.m) 1.00 1 105(1) Subgrade Preparation (common Material) 1,680.00 Sq.m. Labor A. Construction Foreman 1.00 1 B. Unskilled Laborer 1.00 2 B.1 Name And Capacity Equipment A. Motorized Road Grader, G710a 1.00 1 B. Vibratory Roller (10 M.t), Sd100dc 1.00 1 C. Water Truck/pump (16000 L) 0.25 1 200(1) Aggregate Subbase Course Labor A. Construction Foreman 1.00 1 B. Unskilled 1.00 2 B.1 Name And Capacity Equipment A. Motorized Road Grader, G710a 1.00 1 B. Vibratory Roller (10 M.t.), Sd 1.00 1 C. Water Truck/pump (16000 L) 0.25 1 Name And Specification Materials A. Aggregate Subbase Course (w/ 15% Shrinkage Factor) 1.15 Cu.m. 201 (1) Aggregate Base Course 336.00 Cu.m. Labor A. Construction Foreman 1.00 1 B. Unskilled 1.00 2 B.1 Name And Capacity Equipment A. Motorized Road Grader, G710a 1.00 1 B. Vibratory Roller (10 M.t.), Sd100dc 1.00 1 C. Water Truck/pump (16000 L) 0.25 1 F.1 Name And Specification Materials A. Aggregate Base Course (w/ 15% Shrinkage Factor) 1.15 Cu.m. 311(1)a.2 Pcc Pavement (palin)-conventional Method, 200mm Thk. 1,400.00 Sq.m. A.1 Labor A. Construction Foreman 1.00 1 B. Skilled Laborer 1.00 4 C. Unskilled Laborer 1.00 12 B.1 Name And Capacity Equipment A. Transit Mixer (5-6 Cu.yd) 1.00 4 B. Concrete Vibrator 1.00 2 C. Concrete Batch (30 Cu.m.) 1.00 1 D. Payloader (1.50 Cu.m)lx80-2c 1.00 1 E. Concrete Screeder (5.5 Hp) 1.00 1 F. Water Truck/pump (16000l) 1.00 1 G. Concrete Saw, Blade 0/ 14” (7.5 Hp) 1.00 1 H. Bar Cutter, Single Phase 0.10 1 I. Joint Sealer Machine 0.25 1 F.1 Name And Specification Materials A. Reinforcing Steel Bar, Grade 40 0.39 Kg. B. Curing Compound 0.29 Lit C. Asphalt Sealant 0.12 Lit. D. Steel Forms (rental) 0.46 I.m. E. Sand 0.1100 Cu.m F. Gravel 0.20 Cu.m G. Portland Cement Type 1 1.90 Bag H. Concrete Saw (diamond Blade 14”) 0.00015 Pc I. Pipe Sleeve, 2” Dia 0.0086 I.m. J. Greasse/tar 0.0056 Lit. Section Vii. Drawings Bill Of Quantities Item No. Scope Of Work Quantity Unit Unit Cost Total Amount 1.) Rehabilitation Of Farm-to-market Road, Brgy. E. Laodenio, Mapanas, Northern Samar B.5 Project Billboard/sign Board 1.00 Each 10,959.69 10,959.69 B.7(2) Occupational Safety And Health Program 1.00 Is 75,925.63 75,925.63 B.9 Mobilization/demobilization 1.00 Is 38,991.04 38,991.04 Part C Earthworks 101(3)a.2 Removal Of Existing Pcc Pavement, 0.2m Thk, Pccp (for Reblocking At Intermittent Section) 1409.00 Sq.m. 238.30 335,764.70 102(2)b Surplus Common Excavation 420.00 Cu.m. 204.24 85,780.80 105(1) Subgrade Preparation (common Material) 1680.00 Sq.m. 21.14 35,515.20 Part D Subbase And Base Course 200(1) Aggregate Subbase Course 267.50 Cu.m. 1,632.38 436,661.66 201(1) Aggregate Base Course 336.00 Cu.m. 2,843.65 955,466.40 Part E Surface Courses 311(1)a.2 Pcc Pavement (plain) Conventional Method, 200mm Thk. 1400.00 Sq.m. 2,160.51 3,024,714.00 Total 4,999,779.12 Total Cost Of All Line Item Includes Cost Of Contractor’s Profit, Taxes And Ocm. Attached Detailed Cost Estimates Section Ix. Bidding Forms Table Of Contents Bid Form 79 Form Of Contract Agreement 81 Omnibus Sworn Statement 83 Bid Form Date: Iaeb No: To: Lgu-mapanas Northern Samar Address: Mapanas Northern Samar We, The Undersigned, Declare That: We Have Examined And Have No Reservation To The Bidding Documents, Including Addenda, For The Contract Rehabilitation Of Farm-to-market Road, Brgy. E. Laodenio, Mapanas, Northern Samar (a) We Offer To Execute The Works For This Contract In Accordance With The Bid And Bid Data Sheet, General And Special Conditions Of Contract Accompanying This Bid; The Total Price Of Our Bid, Excluding Any Discounts Offered In Item (d) Below Is: [insert Information]; The Discounts Offered And The Methodology For Their Application Are: [insert Information]; (b) Our Bid Shall Be Valid For A Period Of 120 Days From The Date Fixed For The Bid Submission Deadline In Accordance With The Bidding Documents, And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period; (c) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract; (d) Our Firm, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Have Nationalities From The Following Eligible Countries: [insert Information]; (e) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (f) Our Firm, Its Affiliates Or Subsidiaries, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Has Not Been Declared Ineligible By The Funding Source; (g) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (h) We Understand That You Are Not Bound To Accept The Lowest Evaluated Bid Or Any Other Bid That You May Receive. Name: In The Capacity Of: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Form Of Contract Agreement This Agreement, Made This [insert Date] Day Of [insert Month], [insert Year] Between [name And Address Of Procuring Entity](hereinafter Called The “entity”) And [name And Address Of Contractor] (hereinafter Called The “contractor”). Whereas, The Entity Is Desirous That The Contractor Execute [name And Identification Number Of Contract] (hereinafter Called “the Works”) And The Entity Has Accepted The Bid For [insert The Amount In Specified Currency In Numbers And Words] By The Contractor For The Execution And Completion Of Such Works And The Remedying Of Any Defects Therein. Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents Shall Be Attached, Deemed To Form, And Be Read And Construed As Part Of This Agreement, To Wit: (a) General And Special Conditions Of Contract; (b) Drawings/plans; (c) Specifications; (d) Invitation To Apply For Eligibility And To Bid; (e) Instructions To Bidders; (f) Bid Data Sheet; (g) Addenda And/or Supplemental/bid Bulletins, If Any; (h) Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes; (i) Eligibility Requirements, Documents And/or Statements; (j) Performance Security; (k) Credit Line Issued By A Licensed Bank, If Any; (l) Notice Of Award Of Contract And The Bidder’s Conforme Thereto; (m) Other Contract Documents That May Be Required By Existing Laws And/or The Entity. 3. In Consideration Of The Payments To Be Made By The Entity To The Contractor As Hereinafter Mentioned, The Contractor Hereby Covenants With The Entity To Execute And Complete The Works And Remedy Any Defects Therein In Conformity With The Provisions Of This Contract In All Respects. 4. The Entity Hereby Covenants To Pay The Contractor In Consideration Of The Execution And Completion Of The Works And The Remedying Of Defects Wherein, The Contract Price Or Such Other Sum As May Become Payable Under The Provisions Of This Contract At The Times And In The Manner Prescribed By This Contract. In Witness Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Signed, Sealed, Delivered By The (for The Entity) Signed, Sealed, Delivered By The (for The Contractor). Binding Signature Of Procuring Entity ________________________________________________ Binding Signature Of Contractor _____________________________________________ [addendum Showing The Corrections, If Any, Made During The Bid Evaluation Should Be Attached With This Agreement] Omnibus Sworn Statement Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Represent It In The Bidding For [name Of The Project] Of The [name Of The Procuring Entity]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary And/or To Represent The [name Of Bidder] In The Bidding As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate Issued By The Corporation Or The Members Of The Joint Venture)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder]is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: I Am Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [jurat] * This Form Will Not Apply For Wb Funded Projects.
Closing Date21 Jan 2025
Tender AmountPHP 4.9 Million (USD 85.3 K)
Municipality Of Carmen , Surigao Del Sur Tender
Civil And Construction...+1Civil Works Others
Philippines
Details: Description Philippine Bidding Documents Completion Of Concrete Perimeter Fence At Evacuation Center Barangay Poblacion Municipality Of Carmen Province Of Surigao Del Sur Table Of Contents Part I Section I. Invitation To Bid 3 Section Ii. Eligibility Documents 5 Section Iii. Eligibility Data Sheet 15 Part Ii Section I. Instructions To Bidders 17 Section Ii. Bid Data Sheet 37 Section Iii. General Conditions Of Contract 40 Section Iv. Special Conditions Of Contract 72 Section V. Specifications 75 Section Vi. Drawings 76 Section Vii. Bill Of Quantities 77 Section Viii. Forms And Qualification Information 79 Part I. Section I. Invitation To Apply For Eligibility And To Bid Republic Of The Philippines Province Of Surigao Del Sur Municipality Of Carmen Invitation For Bids Completion Of Concrete Perimeter Fence At Evacuation Center Poblacion, Carmen, Surigao Del Sur 1. The Municipal Government Of Carmen, Surigao Del Sur Allocated Funds Under 20% Ldf 2025 Intends To Apply The Sum Of P 4,000,000.00 Being The Approved Budget For Contract (abc) To Payment Under The Contract For The Completion Of Concrete Perimeter Fence At Evacuation Center At Brgy. Poblacion, Carmen, Surigao Del Sur. Bids Received In Excess Of The Abc Shall Be Automatically Rejected During The Bid Opening. 2. The Municipal Government Of Carmen, Surigao Del Sur Now Invites Sealed Bids From Eligible Bidders For The Completion Of Concrete Perimeter Fence At Evacuation Center. Completion Of The Works Required By 105 Calendar Days. 3. Eligibility Screening And Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “ Government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interest Of Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information And Inspect The Bidding Documents At The Address Given Below From 8:00 A.m. To 5:00 P.m., Mondays Thru Fridays, Except Holidays. 5. A Complete Set Of Bidding Documents In English May Be Purchased By Eligible Bidders On January 30, 2025 To February 18, 2025 From The Address Below And Upon Payment Of A Non-refundable Fee Of Five Thousand Pesos (p 5,000.00). The Bidding Documents Shall Be Received Personally By The Eligible Bidder Or His Authorized Representative During Office Hours. 6. The Municipal Government Of Carmen, Surigao Del Sur Will Hold A Pre-bid Conference Open To All Eligible Bidders On February 6, 2025 At 10:00 A.m. At The Bac Office, Municipal Building, Carmen, Surigao Del Sur. 7. Bids Together With The Eligibility Documents Must Be Delivered To The Address Below On Or Before February 19, 2025 At 10:00 A.m. And In 3 Copies Each And In Two Separate Envelopes. And Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Prescribed Amount. Late Bids Shall Not Be Accepted. 8. Bid Opening Shall Be On February 19, 2025 At 10:00 A.m. At The Bac Office, Municipal Building, Carmen, Surigao Del Sur. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 9. To Be Considered Eligible And Qualified, A Bidder Must Have Successful Experience As Prime Contractor In The Construction Of At Least One (1) Work Of A Nature And Complexity Equivalent To The Works In The Last Five (5) Years ( To Comply With This Requirement, Single Works Cited Should Be At Least Eighty Percent (80%) Of Value Of Estimated Contract Cost Of Works Under Bid), Such Being Verifiable From Completion Certificates; Have An Annual Turnover From All Works Average Over The Last Three (3) Years Equal To One Hundred Percent (100%) Of The Estimated Value Of The Contract To Be Bid. 10. The Municipal Government Of Carmen, Surigao Del Sur Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Office Of The Bids & Awards Committee For. Alain P. Cabanilla Carmen Municipal Hall Poblacion, Carmen, Surigao Del Sur Cellphone Number: 09304926186 Bac Chairperson (sgd) For. Alain P. Cabanilla Chairman, Bids And Awards Committee Carmen, Surigao Del Sur Part I. Section Ii. Eligibility Documents 1. Eligibility Criteria 1.1 A Bidder, And All Parties Constituting The Bidder, Shall Be Considered Eligible If It Has Satisfied The Requirement Provided In The Eligibility Data Sheet (eds) As Defined By The Funding Source Indicated In The Invitation To Apply For Eligibility And To Bid (iaeb). 1.2 A Bidder Shall Be Deemed To Have The Nationality Of A Country If The Bidder Is A Citizen Or Is Constituted, Or Incorporated, And Operates In Conformity With The Provisions Of The Laws Of That Country. This Criterion Shall Also Apply To The Determination Of The Nationality Of Proposed Subcontractors Or Suppliers For Any Part Of The Contract, Including All Related Services. 1.3 Bids Submitted By A Joint Venture (jv) Of Two Or More Entities As Partners, Shall Comply With The Following Requirements: (a) The Bid, And In Case Of A Successful Bid, The Contract Agreement, Shall Be Signed So As To Be Legally Binding On All Partners; (b) One Of The Parties To The Jv Shall Be Authorized To Be The Lead Partner; And This Authorization Shall Be Evidenced By Submitting A Special Power Of Attorney Signed By Legally Authorized Signatories Of All The Partners; (c) The Lead Partner Shall Be Authorized To Incur Liabilities, Receive Payments And Receive Instructions For And On Behalf Of All Partners To The Jv; (d) All Partners Of The Jv Shall Be Jointly And Severally Liable For The Execution Of The Contract In Accordance With The Contract Terms, And A Relevant Statement To This Effect Shall Be Included In The Authorization Mentioned In Item (b) Above As Well As In The Bid Form And The Contract Agreement (in Case Of A Successful Bid); And (e) A Copy Of The Notarized Joint Venture Agreement (jva) To Be Entered Into By The Jv Partners Shall Be Submitted With The Bid. 1.4 Subject To The Provisions In The Eds, A Bidder (including All Members Of A Jv And Subcontractors) Shall Not Be Presently Associated, Or Shall Not Have Been Associated In The Past, Directly Or Indirectly, With The Consultant Or Any Other Entity That Has Prepared The Design, Specifications, And Other Documents For The Project; Neither To Those Being Proposed As The Representative Of The Procuring Entity For The Contract. 1.5 A Bidder Shall Not Have A Conflict Of Interest. All Bidders Found To Have A Conflict Of Interest Shall Be Disqualified. A Bidder May Be Considered To Have Conflicting Interests With Another Bidder In Any Of The Events Described In Paragraphs (a) Through (c) Below And A General Conflict Of Interest In Any Of The Circumstances Set Out In Paragraphs (d) Through (g) Below: (a) Have Common Controlling Shareholders; (b) Receive Or Have Received Any Direct Or Indirect Subsidy From Any Of The Bidders; (c) Have The Same Legal Representative For Purposes Of This Bid; (d) Have A Relationship With Each Other, Directly Or Through Common Third Parties, That Puts Them In A Position To Have Access To Information About Or Influence On The Bid Of Another Bidder, Or Influence The Decisions Of The Procuring Entity Regarding This Bidding Process; (e) Submit More Than One Bid In This Bidding Process. However, This Does Not Limit The Participation Of Subcontractors (if Indicated In The Eds) In More Than One Bid, Or As Bidders And Subcontractors Simultaneously; (f) Participated As A Consultant In The Preparation Of The Design Or Technical Specifications Of The Goods And Related Services That Are The Subject Of The Bid; Or (g) A Firm Or An Organization Who Lends, Or Temporarily Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement For Or Implementation Of The Project, If The Personnel Would Be Involved In Any Capacity On The Same Project. 1.6 Bidders Shall Not Be Under A Declaration Of Ineligibility For Corrupt, Fraudulent, Or Coercive Practices. For Purposes Of This Clause, Corrupt, Fraudulent, And Coercive Practices Are Defined As Follows: (a) "corrupt Practice" Means Behavior On The Part Of Officials In The Public Or Private Sectors By Which They Improperly And Unlawfully Enrich Themselves, Others, Or Induce Others To Do So, By Misusing The Position In Which They Are Placed, And Includes The Offering, Giving, Receiving, Or Soliciting Of Anything Of Value To Influence The Action Of Any Such Official In The Procurement Process Or In Contract Execution; Entering, On Behalf Of The Procuring Entity, Into Any Contract Or Transaction Manifestly And Grossly Disadvantageous To The Same, Whether Or Not The Public Officer Profited Or Will Profit Thereby; And Similar Acts As Provided In Republic Act 3019; (b) "fraudulent Practice" Means A Misrepresentation Of Facts In Order To Influence A Procurement Process Or The Execution Of A Contract To The Detriment Of The Procuring Entity, And Includes Collusive Practices Among Bidders (prior To Or After Bid Submission) Designed To Establish Bid Prices At Artificial, Non-competitive Levels And To Deprive The Procuring Entity Of The Benefits Of Free And Open Competition; (c) “collusive Practices” Means A Scheme Or Arrangement Between Two Or More Bidders, With Or Without The Knowledge Of The Procuring Entity, Designed To Establish Bid Prices At Artificial, Non-competitive Levels; And (d) “coercive Practices” Means Harming Or Threatening To Harm, Directly Or Indirectly, Persons, Or Their Property To Influence Their Participation In A Procurement Process, Or Affect The Execution Of A Contract. 1.7 All Bidding Documents Shall Be Accompanied By A Sworn Affidavit Of The Bidder That It Is Not Related To The Head Of The Procuring Entity By Consanguinity Or Affinity Up To The Third Civil Degree Or Any Of The Procuring Entity’s Officers Or Employees Having Direct Access To Information That May Substantially Affect The Result Of The Bidding, Such As, But Not Limited To, The Members Of The Bids And Awards Committee (bac), The Members Of The Technical Working Group (twg), The Bac Secretariat, The Members Of The Project Management Office (pmo), And The Designers Of The Project. This Clause Shall Apply To The Following Persons: (a) If The Bidder Is An Individual Or A Sole Proprietorship, To The Bidder Himself; (b) If The Bidder Is A Partnership, To All Its Officers And Members; (c) If The Bidder Is A Corporation, To All Its Officers, Directors, And Controlling Stockholders; And (d) If The Bidder Is A Jv, The Provisions Of Items (a), (b), Or (c) Of This Clause Shall Correspondingly Apply To Each Of The Members Of The Said Jv, As May Be Appropriate. Relationship Of The Nature Described Above Or Failure To Comply With The Provisions Of This Clause Will Result In The Rejection Of A Bidder’s Bid. 1.8 Unless Otherwise Indicated In The Eds, Government-owned And/or –controlled Corporations Shall Be Eligible Only If, In Addition To Conformance With All Of The Above Requirements, They Are Also: (a) Commercially-oriented Legal Entities Distinct From The Procuring Entity, And Not A National Government Department; (b) Financially Autonomous, As Demonstrated By Requirements In Their Statutes Or By-laws To Provide Separate Audited Accounts And Return On Capital, Powers To Raise Loans And Obtain Revenues Through The Sale Of Goods Or Services; (c) Managerially Autonomous; And (d) Possess Additional Eligibility Requirements Indicated In The Eds. 2. Eligibility Requirements 2.1 Unless Otherwise Indicated In The Eds, The Eligibility Requirements Listed In The Following Clause Shall Be Submitted To The Bac In Advance Of The Pre-bid Conference In A Sealed Eligibility Envelope Duly Marked As Such. These Eligibility Envelopes Of Prospective Bidders Shall Be Submitted On Or Before The Date Of The Eligibility Check Specified In The Invitation To Apply For Eligibility And To Bid For Purposes Of Determining Eligibility Of Prospective Bidders. 2.2 Prospective Bidders Shall Submit The Following Eligibility Requirements, Unless Otherwise Stated In The Eds: (a) Class "a" Documents – Legal Documents (a.1) Department Of Trade And Industry (dti) Business Name Registration Or Securities And Exchange Commission (sec) Registration Certificate, Whichever May Be Appropriate Under Existing Laws Of The Philippines; (a.2) Valid And Current Mayor’s Permit/municipal License; (a.3) Taxpayer’s Identification Number; (a.4) Statement Of The Prospective Bidder That It Is Not “blacklisted” Or Barred From Bidding By The Government Or Any Of Its Agencies, Offices, Corporations Or Lgus, Including Non-inclusion In The Consolidated Blacklisting Report Issued By The Gop; Technical Documents (a.5) Statement Of The Prospective Bidder Of All Its Ongoing And Completed Government And Private Contracts Within The Relevant Period Pursuant To Clause 2.6, Where Applicable, Including Contracts Awarded But Not Yet Started, If Any. The Statement Shall State For Each Contract Whether It Is Ongoing, Completed Or Awarded But Not Yet Started; And Identify Whether Such Contracts Are Similar Or Not Similar In Nature And Complexity To The Project. The Statement Shall Include, For Each Contract, The Following: (i) The Name Of The Contract; (ii) Date Of Award Of The Contract; (iii) Contract Duration; (iv) Owner’s Name And Address; (v) Nature Of Work; (vi) Contractor’s Role (whether Sole Contractor, Sub-contractor, Or Partner In A Jv); (vii) Total Contract Value At Award; (viii) Date Of Completion Or Estimated Completion Time; (ix) Total Contract Value At Completion, If Applicable; (x) Percentages Of Planned And Actual Accomplishments, If Applicable; (xi) Value Of Outstanding Works, If Applicable; (xii) The Statement Shall Be Supported By The Notices Of Award And/or Notices To Proceed Issued By The Owners; And (xiii) The Statement Shall Be Supported By The Constructors Performance Evaluation System (cpes) Rating Sheets, And/or Certificates Of Completion And Owner’s Acceptance, If Applicable. (a.6) A Valid Philippine Contractors Accreditation Board (pcab) License And Registration For The Type And Cost Of The Contract To Be Bid; (a.7) Other Appropriate Licenses Stated In The Eds; (a.8) The Bidder’s Statement Of: Availability Of The Prospective Bidder’s Key Personnel, Such As Project Engineers, Materials Engineers And Foremen, That May Be Used For Construction Contracts; (a.9) The Bidder’s Statement Of: Availability Of Equipment That He Owns, Has Under Lease, And/or Has Under Purchase Agreements, That May Be Used For Construction Contracts, Provided That Ownership Of Equipment Is Not A Requisite For Eligibility; Financial Documents (a.10) The Prospective Bidder’s Audited Financial Statements, Stamped “received” By The Bureau Of Internal Revenue (bir) Or Its Duly Accredited And Authorized Institutions, For The Immediately Preceding Calendar Year, Showing, Among Others, The Prospective Bidder’s Total And Current Assets And Liabilities; (a.11) Prospective Bidder’s Computation Of Its Net Financial Contracting Capacity (nfcc) As Described In The Eds, Or At The Bidder’s Option A Commitment From A Licensed Bank To Extend A Credit Line, In The Event Of An Award In The Bidder’s Favor, Or At The Bidder’s Option A Cash Deposit Certificate, Of Not Less Than The Amount Shown In The Eds; (b) Class "b" Documents – (b.1) A Valid Jva; (b.2) A Letter Authorizing The Bac Or Its Duly Authorized Representative/s To Verify All Of The Documents Submitted; And (b.3) Any Other Document Described In The Eds. 2.3 A Bidder Portions Of The Works, Subject To The Maximum Allowable Limit For Subcontracting Of Works As Specified In Eds Clause 1.5(e). Subcontracting Of Any Portion Of The Works Shall Not Relieve The Bidder From Any Liability Or Obligation That May Arise From Its Performance. The Bidder Shall Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants Or Workmen As Fully As If These Were The Bidder’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants Or Workmen. 2.4 Subcontractors Must Comply With The Provisions Of Clause 1 Herein. For This Purpose, The Bidder Shall Include In Technical Proposal Of Its Bid All The Documents Required Under Clause 2.2 Herein. If The Procuring Entity Determines During Post-qualification That A Subcontractor Is Ineligible, The Subcontracting Of Such Portion Of The Works Assigned To The Ineligible Subcontractor Shall Be Disallowed. 2.5 If A Bidder Has Previously Secured A Certification From The Procuring Entity To The Effect That It Has Previously Submitted The Above-enumerated Class “a” Documents, The Said Certification May Be Submitted In Lieu Of The Requirements Enumerated In Clauses 2.2(a.1) To 2.2(a.11). 2.6 In Case Of A Prospective Foreign Bidder, If Allowed, The Eligibility Requirements Described In Clause 2.1 Herein May Be Substituted With The Appropriate Equivalent Documents Issued By The Prospective Bidder’s Home Country; Such Documents Must Be Duly Acknowledged Or Authenticated By The Appropriate Philippine Consulate Therein. 2.7 To Be Considered Eligible And Qualified For Contract Award, A Bidder Must Meet The Minimum Qualifying Criteria Stated In The Eds. The Use Of Specialist Subcontractors Shall Also Be Stated In The Eds. 2.8 The Bidder’s Authorized Signatory Must Certify All Copy Documents As True And Correct Copies Of The Original Document(s). Bidders Must Follow The Format And Sequence Set Out Above. Should A Bidder Fail To Do So The Procuring Entity Will Accept No Liability For The Rejection Of A Bidder’s Bid In Accordance With The Corresponding Clause In The Instructions To Bidders. 2.9 Eligible Bidders Shall Be Notified Of Such Eligibility Through A Notice Of Eligibility Issued By The Bac Of The Procuring Entity Immediately After The Opening Of Eligibility Documents Pursuant To Section 23.3 Of The Irr-a Of R.a. 9184. Only Bids From Eligible Bidders Shall Be Opened And Considered For Award Of Contract. These Eligible Bidders, Whether Single Entities Or Jvs, Should Confirm In Their Bids That The Originally-submitted Information Remains Correct As Of The Date Of Bid Submission. 3. Format And Signing Of Eligibility Documents 3.1 Prospective Bidders Shall Prepare An Original Of The Eligibility Documents As Described In Clause 2, And Clearly Mark Each “original – Eligibility Documents”. In Addition, Each Prospective Bidder Shall Submit Copies Of The Eligibility Documents, And Clearly Mark Them “copy No. ___ - Eligibility Documents”. In The Event Of Any Discrepancy Between The Original And The Copies, The Original Shall Prevail. 3.2 The Original And The Number Of Copies Of The Bid As Indicated In The Eds Shall Be Typed Or Written In Indelible Ink And Shall Be Signed By The Prospective Bidder Or A Person Or Persons Duly Authorized To Bind The Prospective Bidder To The Contract. All Pages Of The Eligibility Documents Shall Be Initialed By The Person Or Persons Signing The Eligibility Documents. 3.3 Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By The Person Signing The Eligibility Documents. 4. Sealing And Marking Of Eligibility Documents 4.1 Prospective Bidders Shall Enclose The Original Documents Described In Clause 2 Sealed In An Envelope Marked “original - Eligibility Documents”. Each Copy Of The Eligibility Documents Shall Be Similarly Sealed Duly Marking The Inner Envelopes As “copy No. ___ - Eligibility Documents”. These Envelopes Containing The Original And The Copies Shall Then Be Enclosed In One Single Envelope. 4.2 All Envelopes Shall: (a) Contain The Name Of The Contract To Be Bid In Capital Letters; (b) Bear The Name And Address Of The Prospective Bidder In Capital Letters; (c) Be Addressed To The Procuring Entity’s Bac; (d) Bear The Specific Identification Of This Project Indicated In The Iaeb; And (e) Bear A Warning “do Not Open Before…” The Date And Time For The Opening Of Eligibility Documents Indicated In The Iaeb, In Accordance With Clause 5. 4.3 The Procuring Entity Will Assume No Responsibility For The Misplacement Or Premature Opening Of The Eligibility Documents Not Sealed And Marked As Required. 5. Deadline For Submission Of Eligibility Documents 5.1 Eligibility Documents Must Be Received By The Procuring Entity’s Bac At The Address And On Or Before The Date And Time Indicated In The Iaeb And The Eds. 6. Late Submission Of Eligibility Documents 6.1 Any Eligibility Documents Submitted After The Deadline For Submission And Receipt Of Eligibility Documents Prescribed By The Procuring Entity, Pursuant To Clause 5, Shall Be Declared “late” And Shall Not Be Accepted By The Procuring Entity. 7. Modification And Withdrawal Of Eligibility Documents 7.1 The Prospective Bidder May Modify Its Eligibility Documents After It Has Been Submitted, Provided That The Modification Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Eligibility Documents. The Prospective Bidder Shall Not Be Allowed To Retrieve Its Original Eligibility Documents, But Shall Be Allowed To Submit Another Set Equally Sealed, Properly Identified, Linked To Its Original Eligibility Documents Marked As “modification” And Stamped “received” By The Bac. Eligibility Documents Modifications Received After The Applicable Deadline Shall Not Be Considered And Shall Be Returned To The Prospective Bidder Unopened. 7.2 A Prospective Bidder May, Through A Letter Of Withdrawal, Withdraw Its Eligibility Documents After It Has Been Submitted, For Valid And Justifiable Reason, Provided That The Letter Of Withdrawal Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Eligibility Documents. Eligibility Documents Requested To Be Withdrawn Shall Be Returned Unopened To The Prospective Bidders. A Prospective Bidder That Withdraws Its Eligibility Documents Shall Not Be Permitted To Submit Another Set Of Eligibility Documents, Directly Or Indirectly, For The Same Contract. 8. Opening And Preliminary Examination Of Eligibility Documents 8.1 The Procuring Entity’s Bac Will Open The Envelopes Containing The Eligibility Documents In The Presence Of The Prospective Bidders’ Representatives Who Choose To Attend, At The Time, On The Date, And At The Place Specified In The Iaeb. The Prospective Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. 8.2 Letters Of Withdrawal Shall Be Read Out And Recorded During The Opening Of Eligibility Documents And The Envelope Containing The Corresponding Withdrawn Eligibility Documents Shall Be Returned To The Withdrawing Prospective Bidder Unopened. If The Withdrawing Prospective Bidder’s Representative Is Present During The Opening, The Original Eligibility Documents And All Copies Thereof Shall Be Returned To The Representative During The Opening Of Eligibility Documents. If No Representative Is Present, The Eligibility Documents Shall Be Returned Unopened By Registered Mail. 8.3 A Prospective Bidder Determined As “ineligible” Has Seven (7) Calendar Days Upon Written Notice Or, If Present At The Time Of The Opening Of Eligibility Documents, Upon Verbal Notification, Within Which To File A Request Or Motion For Reconsideration With The Bac: Provided, However, That The Motion For Reconsideration Shall Not Be Granted If It Is Established That The Finding Of Failure Is Due To The Fault Of The Prospective Bidder Concerned: Provided, Further, That The Bac Shall Decide On The Request For Reconsideration Within Seven (7) Calendar Days From Receipt Thereof. If A Failed Prospective Bidder Signifies His Intent To File A Motion For Reconsideration, In The Case Of A Prospective Bidder Who Is Declared Ineligible, The Bac Shall Hold The Eligibility Documents Until Such Time That The Motion For Reconsideration Or Protest Has Been Resolved. 8.4 The Eligibility Documents Envelopes And Modifications, If Any, Shall Be Opened One At A Time, And The Following Read Out And Recorded: (a) The Name Of The Prospective Bidder; (b) Whether There Is A Modification Or Substitution; And (c) The Presence Or Absence Of Each Document Comprising The Eligibility Documents Vis-à-vis A Checklist Of The Required Documents. 8.5 The Eligibility Of Each Prospective Bidder Shall Be Determined By Examining Each Bidder’s Eligibility Requirements Or Statements Against A Checklist Of Requirements, Using Non-discretionary “pass/fail” Criteria, As Stated In The Iaeb, And Shall Be Determined As Either “eligible” Or “ineligible.” If A Prospective Bidder Submits The Specific Eligibility Document Required, He Shall Be Rated “passed” For That Particular Requirement. In This Regard, Failure To Submit A Requirement, Or An Incomplete Or Patently Insufficient Submission, Shall Be Considered “failed” For The Particular Eligibility Requirement Concerned. If A Prospective Bidder Is Rated “passed” For All The Eligibility Requirements, He Shall Be Considered Eligible To Participate In The Bidding, And The Bac Shall Mark The Set Of Eligibility Documents Of The Prospective Bidder Concerned As “eligible.” If A Prospective Bidder Is Rated “failed” In Any Of The Eligibility Requirements, He Shall Be Considered Ineligible To Participate In The Bidding, And The Bac Shall Mark The Set Of Eligibility Documents Of The Prospective Bidder Concerned As “ineligible.” In Either Case, The Bac Chairperson Or His Duly Designated Authority Shall Countersign The Markings. 8.6 The Procuring Entity Shall Prepare The Minutes Of The Proceedings Of The Opening Of Eligibility Documents That Shall Include, As A Minimum: (a) Names Of Prospective Bidders And Findings Of Eligibility; And (b) Attendance Sheet. The Minutes Of The Proceedings Of The Opening Of Eligibility Documents Shall Be Available To The Public Upon Written Request And Payment Of A Specified Fee To Recover Cost Of Materials And Production. Part I. Section Iii. Eligibility Data Sheet 1.1 Eligible Bidders Are As Defined In Guide¬lines: 1.4 All Bidders Shall Submit A Written Statement Of Compliance With This Provision. 1.5(e) There Is No Restriction On The Involvement Of General Sub-contractors In The Areas Of Manual And Semi-skilled Labor Or Construction Materials Provided That The Contractor Undertakes Not Less Than Fifty Percent (50%) Of The Contracted Works With Its Own Resources. 1.8 There Are No Additional Eligibility Requirements 1.8(d) There Are No Additional Eligibility Requirements. 2.1 All Documents Described In Clause 2.2 Shall Be Included In The Technical Proposal. Documents Do Not Need To Be Acknowledged Or Authenticated By The Appropriate Philippine Consulate. 2.2 In Lieu Of The Following Documents Required In Clause 2.2(a), The Equivalent Document In The Prospective Bidder’s Country/place Of Origin Shall Be Submitted: (a) Dti/sec/cda Registration; (b) Valid And Current Mayor’s Permit Issued By The City Or Municipality Where The Place Of Business Of The Prospective Bidder Is Located; (c) Tax Clearance, As Finally Reviewed And Approved By The Bir (d) Philippines Contractors Accreditation Board (pcab) License And Registration; And (e) Audited Financial Statements. 2.2(a.7) There Are No Other Additional License Required 2.2(a.11) In The Event That A Bidder, At Its Own Option, Does Not Provide Either A Credit Line Or Cash Deposit Certificate In The Amount At Least Equal To Ten Percent (10%) Of The Bid, The Bidder Must Provide A Statement Of Its Nfcc. The Nfcc Is As Follows: [(current Assets Minus Current Liabilities) (k)] Minus The Value Of All Outstanding Contracts Including Those Awarded But Not Yet Started.” Where: K = 15 (regardless Of Contract Duration) 2.2(b.3) None. 2.7 To Be Considered Eligible And Qualified A Bidder Must Have Successful Experience As Prime Contractor In The Construction Of At Least One (1) Work Of A Nature And Complexity Equivalent To The Works In The Last Five (5) Years (to Comply With This Requirement, Single Works Cited Should Be At Least Eighty Percent (80%) Of The Value Of Bid Under Consideration For Award), Such Being Verifiable From Completion Certificates, And Have An Annual Turnover From All Works Averaged Over The Last Three (3) Years Equal To One Hundred Percent (100%) Of The Value Of Bid Under Consideration For Award. 2.7 Not Applicable. 3.2 Each Prospective Bidder Shall Submit One (1) Original And Two (2) Copies Of Its Eligibility Documents. 5.1 The Address For Submission Of Eligibility Documents Is The Chairman, Bids And Awards Committee, Municipal Hall, Carmen, Surigao Del Sur The Deadline For Submission Of Eligibility Documents Is 10:00 A.m., February 19, 2025 (same As Submission Of Technical And Financial Envelope). Part Ii. Section I. Instructions To Bidders Table Of Contents 1. Scope Of Bid 19 2. Corrupt, Fraudulent, And Coercive Practices 19 3. Conflict Of Interest 20 4. One Bid Per Bidder 22 5. Pre-bid Conference 22 6. Content Of The Bidding Documents 22 7. Clarification And Amendment Of Bidding Documents 23 8. Cost Of Bidding 23 9. Language Of Bid 23 10. Documents Comprising The Bid 23 11. Bid Prices 25 12. Currencies Of Bid And Payment 25 13. Bid Validity 26 14. Bid Security 26 15. Alternative Proposals By Bidders 27 16. Format And Signing Of Bid 27 17. Sealing And Marking Of Bids 28 18. Deadline For Submission Of Bids 28 19. Late Bids 29 20. Modification And Withdrawal Of Bids 29 21. Opening And Preliminary Examination Of Bids 29 22. Process To Be Confidential 31 23. Detailed Evaluation And Comparison Of Bids 31 24. Preference For Provincial Bidders 32 25. Post Qualification Of The Lowest Calculated Bid 33 26. Right Of The Procuring Entity To Reject Any Or All Bids 33 27. Award Criteria 34 28. Notice Of Award 34 29. Signing Of The Contract 34 30. Performance Security 34 31. Notice To Proceed 35 32. Advance Payment 36 1. Scope Of Bid 1.1. The Procuring Entity As Defined In The Bds, Invites Bids For The Construction Of Works, As Described In The Bds. The Name And Identification Number Of The Contract Is Provided In The Bds. 1.2. The Successful Bidder Will Be Expected To Complete The Works By The Intended Completion Date Specified In The Scc Clause 1.17. 1.3. The Procuring Entity Has A Budget Or Has Applied For Or Received Funds From The Funding Source Named In The Bds, And In The Amount Indicated In The Bds. It Intends To Apply Part Of The Funds Received For The Project, As Defined In The Bds, To Cover Eligible Payments Under The Contract For The Works. 2. Corrupt, Fraudulent, And Coercive Practices 2.1. The Funding Source Requires That The Procuring Entity, As Well As Bidders And Contractors, Shall Observe The Highest Standard Of Ethics Sduring The Procurement And Execution Of Such Contracts. In Pursuance Of This Policy, The Funding Source: (a) Defines, For Purposes Of This Provision, The Terms Set Forth Below As Follows: (a.1) "corrupt Practice" Means Behavior On The Part Of Officials In The Public Or Private Sectors By Which They Improperly And Unlawfully Enrich Themselves, Others, Or Induce Others To Do So, By Misusing The Position In Which They Are Placed, And Includes The Offering, Giving, Receiving, Or Soliciting Of Anything Of Value To Influence The Action Of Any Such Official In The Procurement Process Or In Contract Execution; Entering, On Behalf Of The Government, Into Any Contract Or Transaction Manifestly And Grossly Disadvantageous To The Same, Whether Or Not The Public Officer Profited Or Will Profit Thereby, And Similar Acts As Provided In Republic Act 3019; (a.2) "fraudulent Practice" Means A Misrepresentation Of Facts In Order To Influence A Procurement Process Or The Execution Of A Contract To The Detriment Of The Procuring Entity, And Includes Collusive Practices Among Bidders (prior To Or After Bid Submission) Designed To Establish Bid Prices At Artificial, Non-competitive Levels And To Deprive The Procuring Entity Of The Benefits Of Free And Open Competition; (a.3) “collusive Practices” Means A Scheme Or Arrangement Between Two Or More Bidders, With Or Without The Knowledge Of The Procuring Entity, Designed To Establish Bid Prices At Artificial, Non-competitive Levels; And (a.4) “coercive Practices” Means Harming Or Threatening To Harm, Directly Or Indirectly, Persons, Or Their Property To Influence Their Participation In A Procurement Process, Or Affect The Execution Of A Contract; (b) Will Reject A Proposal For Award If It Determines That The Bidder Recommended For Award Has Engaged In Corrupt Or Fraudulent Practices In Competing For The Contract; And (c) Will Declare A Firm Ineligible, Either Indefinitely Or For A Stated Period Of Time, To Be Awarded Contract Funded By The Funding Source If It At Any Time Determines That The Firm Has Engaged In Corrupt Or Fraudulent Practices In Competing Or, Or In Executing, A Contract Funded By The Funding Source. 2.2. Further, The Gop Will Seek To Impose The Maximum Penalties For Civil And Criminal Liability Available Under The Applicable Law On Individuals And Organizations Deemed To Be Involved With Corrupt, Fraudulent, Or Practices. 2.3. Furthermore, The Funding Source Reserves The Right To Inspect And Audit Records And Accounts Of A Contractor In The Bidding For And Performance Of A Contract Themselves Or Through Independent Auditors As Reflected In The Gcc Clause 33. 3. Conflict Of Interest 3.1. All Bidders Found To Have Conflicting Interests Shall Be Disqualified To Participate In The Procurement At Hand, Without Prejudice To The Imposition Of Appropriate Administrative, Civil, And Criminal Sanctions. A Bidder May Be Considered To Have Conflicting Interests With Another Bidder In Any Of The Events Described In Paragraphs (a) Through (c) And A General Conflict Of Interest In Any Of The Circumstances Set Out In Paragraphs (d) Through (g) Below: (a) A Bidder Has Controlling Shareholders In Common With Another Bidder; (b) A Bidder Receives Or Has Received Any Direct Or Indirect Subsidy From Any Other Bidder; (c) A Bidder Has The Same Legal Representative As That Of Another Bidder For Purposes Of This Bid; (d) A Bidder Has A Relationship, Directly Or Through Third Parties, That Puts Them In A Position To Have Access To Information About Or Influence On The Bid Of Another Bidder Or Influence The Decisions Of The Procuring Entity Regarding This Bidding Process. This Will Include A Firm Or An Organization Who Lends, Or Temporarily Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement For Or Implementation Of The Project If The Personnel Would Be Involved In Any Capacity On The Same Project; (e) A Bidder Submits More Than One Bid In This Bidding Process. However, This Does Not Limit The Participation Of Subcontractors In More Than One Bid; (f) A Bidder Who Participated As A Consultant In The Preparation Of The Design Or Technical Specifications Of The Goods And Related Services That Are The Subject Of The Bid; Or (g) A Bidder Who Lends, Or Temporary Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement For Or Implementation Of The Project, If The Personnel Would Be Involved In Any Capacity On The Same Project. 3.2. In Accordance With Section 47 Of The Irr-a Of R.a. 9184, All Bidding Documents Shall Be Accompanied By A Sworn Affidavit Of The Bidder That It Is Not Related To The Head Of The Procuring Entity By Consanguinity Or Affinity Up To The Third Civil Degree Or Any Of The Procuring Entity’s Officers Or Employees Having Direct Access To Information That May Substantially Affect The Result Of The Bidding, Such As, But Not Limited To, The Members Of The Bac, The Members Of The Technical Working Group (twg), The Bac Secretariat, The Members Of The Project Management Office (pmo), And The Designers Of The Project. This Clause Shall Apply To The Following Persons: (a) If The Bidder Is An Individual Or A Sole Proprietorship, To The Bidder Himself; (b) If The Bidder Is A Partnership, To All Its Officers And Members; (c) If The Bidder Is A Corporation, To All Its Officers, Directors, And Controlling Stockholders; And (d) If The Bidder Is A Joint Venture (jv), The Provisions Of Items (a), (b), Or (c) Of This Clause Shall Correspondingly Apply To Each Of The Members Of The Said Jv, As May Be Appropriate. Relationship Of The Nature Described Above Or Failure To Comply With This Clause Will Result In The Automatic Disqualification Of A Bidder. 4. One Bid Per Bidder 4.1. Each Bidder Shall Submit Only One Bid, Either Individually Or As A Partner In A Jv. A Bidder Who Submits Or Participates In More Than One Bid (other Than As A Subcontractor If A Subcontractor Is Permitted To Participate In More Than One Bid) Will Cause All The Proposals With The Bidder’s Participation To Be Disqualified. This Shall Be Without Prejudice To Any Applicable Criminal, Civil And Administrative Penalties That May Be Imposed Upon The Persons And Entities Concerned. 5. Pre-bid Conference 5.1. The Bidder By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site And Determined The General Characteristics Of The Contract Works And The Conditions Of The Contract To Bid. The Bac Shall Require An Affidavit Of Such Site Inspection From Eligible Bidder. 5.2. The Procuring Entity May Organize A Site Visit Concurrently With The Pre-bid Conference. 5.3. The Bidder Or His Official Is Invited By The Procuring Entity To A Pre-bid Conference, The Venue, Time And Date Of Which Shall Be Indicated In The Bds. Non-attendance At The Pre-bid Conference Shall Not Be A Ground For Disqualification Of A Bidder. 5.4. The Pre-bid Conference Shall Be Held At Least Twelve (12) Calendar Days Before The Deadline For The Submission And Receipt Of Bids. However, Attendance Of The Bidders Shall Not Be Mandatory. 5.5. The Pre-bid Conference Shall Discuss Among Other Things, The Technical And Financial Components Of The Contract To Be Bid. The Minutes Of The Pre-bid Conference Shall Be Recorded And Made Available To All Participants Not Later Than Three (3) Calendar Days After The Pre-bid Conference. 6. Content Of The Bidding Documents 6.1. The Set Of Bidding Documents Comprises The Documents Listed In The Table Below And Addenda Issued In Accordance With Itb Clause 7: Partii Section V. Specifications Partii. Section Vi. Drawings Partii. Section Vii. Bill Of Quantities Partii Section Viii. Forms And Qualification Information 6.2. Bidders Should Note That The Procuring Entity Will Only Accept Bids From Bidders That Have Purchased The Bidding Documents From The Office Indicated In The Iaeb. 7. Clarification And Amendment Of Bidding Documents 7.1. Bidders May Request For Clarification(s) On Any Part Of The Bidding Documents Or For An Interpretation. Such A Request Must Be In Writing And Submitted To The Procuring Entity At The Address Indicated In The Bds At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. The Procuring Entity Shall Respond To The Said Request By Issuing A Supplemental/bid Bulletin, To Be Made Available To All Those Who Have Properly Secured The Bidding Documents From The Procuring Entity, At Least Seven (7) Calendar Days Before The Deadline For The Submission And Receipt Of Bids. It Shall Be The Responsibility Of All Those Who Have Properly Secured The Bidding Documents To Inquire And Secure Supplemental/bid Bulletins That May Be Issued By The Procuring Entity. 7.2. Supplemental/bid Bulletins May Be Issued Upon The Procuring Entity’s Initiative For Purposes Of Clarifying Or Modifying Any Provision Of The Bidding Documents Not Later Than Seven (7) Calendar Days Before The Deadline For The Submission And Receipt Of Bids. It Is The Responsibility Of The Procuring Entity To Notify In Writing And Through Posting In The Website Of The Procuring Entity And The Government Electronic Procurement System (g-eps) The Said Documents To All Those Who Have Properly Secured The Bidding Documents. Any Modification To The Bidding Documents Shall Be Identified As An Amendment. Bidders Who Have Submitted Bids Before The Issuance Of The Supplemental/bid Bulletin Must Be Informed And Allowed To Modify Or Withdraw Their Bids. 8. Cost Of Bidding 8.1. The Bidder Shall Bear All Costs Associated With The Preparation And Submission Of His Bid, And The Procuring Entity Will In No Case Be Responsible Or Liable For Those Costs. 9. Language Of Bid 9.1. The Bid, As Well As All Correspondence And Documents Relating To The Bid Exchanged By The Bidder And The Procuring Entity, Shall Be Written In English. Supporting Documents And Printed Literature Furnished By The Bidder May Be In Another Language Provided They Are Accompanied By An Accurate Translation Of The Relevant Passages In English, In Which Case, For Purposes Of Interpretation Of The Bid, The English Translation Shall Govern. 10. Documents Comprising The Bid 10.1. Unless Otherwise Indicated In The Bds, Bids Shall Include The Following: (a) Technical Proposal – (a.1) Bid Security As To Form, Amount, And Validity Period; (a.2) Authority Of The Signing Official; (a.3) Construction Schedule And S-curve; (a.4) Manpower Schedule; (a.5) Construction Methods; (a.6) Organizational Chart For The Contract To Be Bid; (a.7) List Of Contractor’s Personnel (viz., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; (a.8) List Of Contractor’s Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project; (a.9) Equipment Utilization Schedule; (a.10) Affidavit Of Site Inspection; (a.11) Written Commitment From The Contractor’s Bank To Extend To It A Credit Line If Awarded The Contract To Be Bid, Or A Cash Deposit Certificate Specifically Committed To The Contract Or Project, If Awarded, In An Amount Not Lower Than That Set In The Bds; (a.12) Construction Safety And Health Program Of The Contractor; (a.13) Certificate From The Bidder Under Oath Of Its Compliance With Existing Labor Laws And Standards; (a.14) A Sworn Affidavit In Accordance With Itb Clause 3.2; And (a.15) Any Other Documents Described In The Bds. (b) Financial Proposal – (b.1) Bid Prices In Bill Of Quantities In The Prescribed Bid Form; (b.2) Detailed Estimates Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals Used In Coming Up With The Bid; (b.3) Cash Flow By The Quarter And Payments Schedule; And (b.4) Any Other Document Described In The Bds. 10.2. If Indicated In The Bds, All Financial Proposals That Exceed The Abc As Indicated In The Bds, Shall Be Rejected. 11. Bid Prices 11.1. The Contract Shall Be For The Whole Works, As Described In Itb Clause 1.1, Based On The Priced Bill Of Quantities Submitted By The Bidder. 11.2. The Bidder Shall Fill In Rates And Prices For All Items Of The Works Described In The Bill Of Quantities. Bids Not Addressing Or Providing All Of The Required Items In The Bidding Documents Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A "0" (zero) For The Said Item Would Mean That It Is Being Offered For Free To The Government. 11.3. All Duties, Taxes, And Other Levies Payable By The Contractor Under The Contract, Or For Any Other Cause, Prior To The Deadline For Submission Of Bids, Shall Be Included In The Rates, Prices, And Total Bid Price Submitted By The Bidder. 11.4. For The Given Scope Of Work In The Contract As Awarded, All Bid Prices Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Indicated In The Bds And Specified In Gcc Clause 47 And Its Corresponding Scc Provision. 12. Currencies Of Bid And Payment 12.1. Subject To Applicable Laws And Unless Otherwise Specified In The Bds, All Bid Prices Shall Be Quoted In Philippine Pesos. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate Prevailing On The Day Of The Bid Opening. 12.2. All Contracts Shall Be Denominated And Payable In Philippine Pesos. 13. Bid Validity 13.1. Bids Shall Remain Valid For The Period Specified In The Bds Which Shall Not Exceed One Hundred Twenty (120) Days From The Date Of The Opening Of Bids. 13.2. In Exceptional Circumstances, The Procuring Entity May Request That The Bidders Extend The Period Of Validity For A Specified Additional Period. The Request And The Bidders’ Responses Shall Be Made In Writing. A Bidder May Refuse The Request Without Forfeiting The Bid Security. A Bidder Agreeing To The Request Will Not Be Required Or Permitted To Otherwise Modify The Bid, But Will Be Required To Extend The Validity Of Bid Security For The Period Of The Extension, And In Compliance With Itb Clause 14 In All Respects. 13.3. Unless Otherwise Indicated In The Bds, If The Period Of Bid Validity Is Extended Beyond Sixty (60) Days After The Original Bid Validity Period, The Bid Prices Shall Remain Fixed And Therefore Not Subject To Any Adjustment. 14. Bid Security 14.1. The Bidder Shall Furnish, As Part Of The Bid, A Bid Security In Local Currency Or In A Freely Convertible Currency, In The Forms And Amount Specified In The Bds. 14.2. As Indicated In The Bds, The Procuring Entity Shall Prescribe The Acceptable Forms Of Bid Security From Among The Following, From Which Acceptable Forms The Bidder May Choose: (a) Cash; (b) A Cashier's Or Certified Check; (c) An Irrevocable Letter Of Credit; (d) A Bank Guarantee; (e) Surety Bond; Or (f) Foreign Government Guarantee. 14.3. In Case Of Bank Guarantee, The Bid Security Shall Be Submitted Using The Form Included In Part Ii, Section Viii, Forms And Qualifications Information, Or Another Form Acceptable To The Procuring Entity. The Form Must Include The Complete Name Of The Bidder. The Bid Security Should Be Valid For The Period Specified In The Bds. 14.4. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity. The Bid Security Of A Jv, If In The Form Of A Bank Guarantee Must Define As “bidder” All Jv Partners And List Them In The Following Manner: A Jv Consisting Of “______,” “______,” And “______”. 14.5. No Bid Securities Shall Be Returned To Bidders After The Opening Of Bids And Before Contract Signing, Except To Those That Failed To Comply With Any Of The Requirements To Be Submitted In The First Bid Envelope Of The Bid, As Provided In This Irr-a. Without Prejudice To The Forfeiture Of Bid Securities, Bid Securities Shall Be Returned Only After The Bidder With The Lowest Calculated Responsive Bid Has Signed The Contract And Furnished The Performance Security, But In No Case Later Than The Expiration Of The Bid Security Validity Period Indicated In The Bds. 14.6. The Bid Security May Be Forfeited: (a) If The Bidder Withdraws The Bid After Bid Opening During The Period Of Bid Validity; (b) If The Bidder Does Not Accept The Correction Of The Bid Price, Pursuant To Itb Clause 23; Or (c) In The Case Of A Successful Bidder, If The Bidder Fails Within The Specified Time Limit To: (c.1) Sign The Agreement; (c.2) Furnish The Required Performance Security; Or (c.3) Enter Into A Jv Agreement If It Has Undertaken To Do So. (d) Any Other Reasons Stated In The Bds. 15. Alternative Proposals By Bidders 15.1. Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 16. Format And Signing Of Bid 16.1. The Bidder Shall Submit One Original Of The Technical Proposal And One Original Of The Financial Proposal As Described In Itb Clause 17 And Clearly Mark Each As “original - Technical Proposal” And “original – Financial Proposal”. In Addition, The Bidder Shall Submit Two (2) Copies Of The Technical Proposal And The Financial Proposal, And Clearly Mark Them “copy No… - Technical Proposal” And “copy No…. – Financial Proposal”. In The Event Of Any Discrepancy Between The Original And The Copies, The Original Shall Prevail. 16.2. The Original And The Two (2) Copies Of The Bid Shall Be Typed Or Written In Indelible Ink And Shall Be Signed By The Bidder Or A Person Or Persons Duly Authorized To Bind The Bidder To The Contract. All Pages Of The Bid Where Entries Or Amendments Have Been Made Shall Be Initialed By The Person Or Persons Signing The Bid. 16.3. Any Interlineations, Erasures, Alterations Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By The Person Signing The Bid. 16.4. Unless Otherwise Provided In The Bds, Commissions Or Gratuities Are Not Allowed. 17. Sealing And Marking Of Bids 17.1. The Bidder Shall Enclose The Original Of The Technical Proposal In One Sealed Envelope Marked As “original - Technical Proposal”; Whereas, The Original Of The Financial Proposal Shall Be Enclosed In Another Sealed Envelope Marked As “original - Financial Proposal”. Both Envelopes Shall Then Be Placed In Another Single Envelope Marked As “original Bid”. 17.2. Each Copy Of The Technical Proposal And Financial Proposal, Shall Be Similarly Sealed Duly Marked As “copy No… - Technical Proposal” And “copy No… – Financial Proposal” Respectively And The Outer Envelope As “copy No”. These Envelopes Containing The Original And The Copies Shall Then Be Enclosed In One Single Envelope That Shall: (a) Name Of The Contract To Be Bid; (b) Bear The Name And Address Of The Bidder; (c) Be Addressed To The Procuring Entity In Accordance With Itb Clause 18.1; (d) Bear The Specific Identification Of This Bidding Process Indicated In The Bds; And (e) Bear A Warning “do Not Open Before…” The Time And Date For The Opening Of Bids , In Accordance With Itb Clause 18.1. 17.3. If All Envelopes Are Not Sealed And Marked As Required, The Procuring Entity Will Assume No Responsibility For The Misplacement Or Premature Opening Of The Bid. 18. Deadline For Submission Of Bids 18.1. Bids Must Be Received By The Bac Of The Procuring Entity At The Address And On Or Before The Date And Time Indicated In The Bds. 19. Late Bids 19.1. Any Bid Submitted After The Deadline For Submission And Receipt Of Bids Prescribed By The Procuring Entity, Pursuant To Itb Clause 18.1, Shall Be Declared “late” And Shall Not Be Accepted By The Procuring Entity. 20. Modification And Withdrawal Of Bids 20.1. The Bidder May Modify Its Bid After It Has Been Submitted; Provided That The Modification Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. The Bidder Shall Not Be Allowed To Retrieve Its Original Bid, But Shall Be Allowed To Submit Another Bid Equally Sealed, Properly Identified, Linked To Its Original Bid Marked As “technical Modification” Or “financial Modification” And Stamped “received” By The Bac. Bid Modifications Received After The Applicable Deadline Shall Not Be Considered And Shall Be Returned To The Bidder Unopened. 20.2. A Bidder May, Through A Letter Of Withdrawal, Withdraw Its Bid After It Has Been Submitted, For Valid And Justifiable Reason; Provided That The Letter Of Withdrawal Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. 20.3. Bids Requested To Be Withdrawn In Accordance With Itb Clause 20.2 Shall Be Returned Unopened To The Bidders. A Bidder May Also Express Its Intention Not To Participate In The Bidding Through A Letter Which Should Reach And Be Stamped By The Bac Before The Deadline For Submission And Receipt Of Bids. A Bidder That Withdraws Its Bid Shall Not Be Permitted To Submit Another Bid, Directly Or Indirectly, For The Same Contract. 20.4. No Bid May Be Modified After The Deadline For Submission Of Bids. No Bid May Be Withdrawn In The Interval Between The Deadline For Submission Of Bids And The Expiration Of The Period Of Bid Validity Specified By The Bidder On The Bid Form. Withdrawal Of A Bid During This Interval May Result In The Forfeiture Of The Bidder’s Bid Security, Pursuant To The Itb Clause 14.6, And The Imposition Of Administrative, Civil And Criminal Sanctions As Prescribed By R.a. 9184 And Its Irr-a. 21. Opening And Preliminary Examination Of Bids 21.1. The Bac Of The Procuring Entity Shall Open Bid Envelopes In The Presence Of Bidders’ Representatives Who Choose To Attend, At The Time, On The Date, And At The Place Specified In The Bds. Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. 21.2. Letters Of Withdrawal Shall Be Read Out And Recorded, And The Envelope Containing The Corresponding Withdrawn Bid Shall Be Returned To The Bidder Unopened. If The Withdrawing Bidder’s Representative Is In Attendance The Original Bid And All Copies Thereof Shall Be Returned To The Representative During The Bid Opening. If The Representative Is Not In Attendance, The Bid Shall Be Returned Unopened By Registered Mail. The Bidder May Withdraw Its Bid Prior To The Deadline For Submission And Receipt Of Bids, Provided That The Corresponding Letter Of Withdrawal Contains A Valid Justification Requesting For Such Withdrawal, Subject To Appropriate Administrative Sanctions. 21.3. If The Bidding Is Subject To An Eligibility Check As Described In Itb Clause 21.6, The Procuring Entity Shall Not Accept The Bids Of Ineligible Bidders. The Procuring Entity Shall Open Bids Of Eligible Bidders Only, In Accordance With The Following Paragraph. 21.4. Outer Envelopes Marked “technical Modification” Or “financial Modification” Will Be Identified But Not Opened. The Procuring Entity Will Announce The Presence And Type Of Modification From The Information Contained On The Outer Envelope. 21.5. The Procuring Entity Shall First Open The Envelopes Holding The Technical Proposals And Modification, If Any, One At A Time, And Read Out And Record The Following: (a) The Name Of The Bidder; (b) Whether There Is A Technical Modification Or Substitution; (c) The Presence, Amount And Validity Of The Bid Security; And (d) The Presence Or Absence Of Each Document Comprising The Technical Proposal Vis-à-vis A Checklist Of The Required Documents. 21.6. The Bac Of The Procuring Entity Shall Determine Each Bidder’s Compliance With The Documents Required To Be Submitted For The Technical Proposal Of The Bid, As Prescribed In Itb Clause 10. For This Purpose, The Bac Of The Procuring Entity Shall Check The Submitted Documents Of Each Bidder Against A Checklist Of Required Documents To Ascertain If They Are All Present In The First (technical) Envelope, Using Non-discretionary “pass/fail” Criteria, As Stated In The Iaeb And Itb Clause 10. If A Bidder Submits All Required Documents, It Shall Be Rated “passed” For That Particular Requirement. In This Regard, Failure To Submit A Requirement, Or An Incomplete Or Patently Insufficient Submission, Shall Be Considered “failed” For The Particular Requirement Concerned. In Case One Or More Of The Above Required Documents In The First Envelope Of A Particular Bid Is Missing, Incomplete, Or Patently Insufficient, The Bac Of The Procuring Entity Shall Rate The Bid Concerned As “failed” And Immediately Return To The Bidder Concerned Its Second (financial) Envelope Unopened. 21.7. Immediately After Determining Compliance With The Requirements In The First Bid Envelope (technical Proposal), The Bac Shall Forthwith Open The Second Bid Envelope (financial Proposal) Of Each Remaining Eligible Bidder Whose First Bid Envelope Was Rated “passed.” The Second Envelope Of Each Complying Bidder Shall Be Opened Within The Same Day. In Case One Or More Of The Requirements In The Second Envelope Of A Particular Bid Is Missing, Incomplete Or Patently Insufficient, And/or If The Submitted Total Bid Price Exceeds The Abc, The Bac Shall Rate The Bid Concerned As “failed.” Bids That Are Determined To Contain All The Requirements For The Second (financial) Envelope Shall Be Rated “passed” And Shall Immediately Be Considered For Detailed Evaluation Of The Bids. 21.8. The Procuring Entity Shall Prepare The Minutes Of The Proceedings Of The Bid Opening That Shall Include, As A Minimum: (a) Abstract Of Bids As Read Including Names Of Bidders, Their Bid Price, Bid Security, Findings Of Preliminary Examination; And (b) Attendance Sheet. The Bac Members Shall Sign The Abstract Of Bids As Read And The Observers May Witness The Same. A Copy Of The Abstract Of Bids As Read Shall Be Made Available To All Interested Bidders. The Minutes Of The Proceedings Of The Bid Opening Shall Be Available To The Public Upon Written Request And Payment At A Specified Fee To Cover The Cost Of Materials. 22. Process To Be Confidential 22.1. Members Of The Bac, Including Its Staff And Personnel, As Well As Its Secretariat And Twg, Are Prohibited From Making Or Accepting Any Kind Of Communication With Any Bidder Regarding The Evaluation Of Their Bids Until The Issuance Of The Notice Of Award. 23. Detailed Evaluation And Comparison Of Bids 23.1. The Procuring Entity Will Evaluate And Compare, In Detail, Only The Bids That Are Rated “passed” For Both Technical And Financial Proposals. 23.2. In Evaluating The Bids To Get The Lowest Calculated Bid, The Procuring Entity Shall Undertake The Following: (a) The Detailed Evaluation Of The Financial Component Of The Bids, To Establish The Correct Calculated Prices Of The Bids; And (b) The Ranking Of The Total Bid Prices As So Calculated From The Lowest To Highest. The Bid With The Lowest Price Shall Be Identified As The Lowest Calculated Bid. 23.3. To Determine The Lowest Calculated Bid, The Bac Shall Use A Non-discretionary “pass/fail” Criteria, As Stated In The Iaeb, Which Shall Include A Consideration Of The Following: (a) The Bid Must Be Complete. Bids Not Addressing Or Providing All Of The Required Items In The Bidding Documents Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A “0” (zero) For The Said Item Would Mean That It Is Being Offered For Free To The Government; And (b) Minor Arithmetical Corrections To Consider Computational Errors, Omissions And Discounts If Allowed, In The Bidding Documents To Enable Proper Comparison Of All Eligible Bids. Any Adjustment Shall Be Calculated In Monetary Terms To Determine The Calculated Prices. 23.4. The Bac Shall Evaluate All Bids On An Equal Footing To Ensure Fair And Competitive Bid Evaluation. For This Purpose, All Bidders Shall Be Required To Include The Cost Of All Taxes, Such As, But Not Limited To, Value Added Tax (vat), Income Tax, Local Taxes, And Other Fiscal Levies And Duties Which Shall Be Itemized In The Bid Form And Reflected In The Detailed Estimates. Such Bids, Including Said Taxes, Shall Be The Basis For Bid Evaluation And Comparison. 23.5. In Case Of Discrepancies Between: (a) Bid Prices In Figures And In Words, The Latter Shall Prevail; (b) The Total Bid Amount And The Sum Of Total Costs Per Item, The Sum Of The Total Costs Per Item Shall Prevail And The Total Bid Amount Will Be Corrected; And (c) Unit Cost In The Detailed Estimate And Unit Cost In The Bill Of Quantities, The Latter Shall Prevail. 23.6. Based On The Detailed Evaluation Of Bids, Those That Comply With The Above-mentioned Requirements Shall Be Ranked In The Ascending Order Of Their Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, To Identify The Lowest Calculated Bid. Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, Which Exceed The Abc Shall Not Be Considered. 23.7. The Estimated Effect Of Any Price Adjustment Conditions Under Gcc Clause 47, During The Period Of Implementation Of The Contract, Will Not Be Taken Into Account In Bid Evaluation. 24. Preference For Provincial Bidders 24.1. If So Indicated In The Bds, Bidders Whose Principal Office Is Within The Same Province Where The Project Is To Be Implemented Shall Be Given Preference By Allowing A Right To Match The Lowest Calculated Bid Subject To Applicable Laws And Following The Mechanism Shown In The Bds. 25. Post Qualification Of The Lowest Calculated Bid The Procuring Entity Shall Conduct Post Qualification To Determine Whether The Bidder That Is Evaluated To Have The Lowest Calculated Bid Complies With And Is Responsive To All Requirements And Conditions For Eligibility And Of The Bidding For The Contract. The Determination Shall Use Non-discretionary “pass/fail” Criteria And Be Based Upon Examination, Verification And Validation Of The Documentary Evidence Of The Bidder’s Eligibility/qualifications Submitted By The Bidder Pursuant To 25.1. Part I. Section Ii. Eligibility Documents And The Technical And Financial Proposals For Itb Clause 10. If The Said Bidder Passes The Post-qualification, His Bid Shall Be Declared As The Lowest Calculated And Responsive Bid (lcrb). 26. Right Of The Procuring Entity To Reject Any Or All Bids 26.1. Notwithstanding The Eligibility Or Post-qualification Of A Bidder, The Procuring Entity Concerned Reserves The Right To Review Its Qualifications At Any Stage Of The Procurement Process If It Has Reasonable Grounds To Believe That A Misrepresentation Has Been Made By The Said Bidder, Or That There Has Been A Change In The Bidder’s Capability To Undertake The Project From The Time It Submitted Its Eligibility Requirements. Should Such Review Uncover Any Misrepresentation Made In The Eligibility And Bidding Requirements, Statements Or Documents, Or Any Changes In The Situation Of The Bidder Which Will Affect Its Capability To Undertake The Project So That It Fails The Preset Eligibility Or Bid Evaluation Criteria, The Procuring Entity Shall Consider The Said Bidder As Ineligible And Shall Disqualify It From Submitting A Bid Or From Obtaining An Award Or Contract. 26.2. The Procuring Entity Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract In The Following Situations: (a) If There Is Prima Facie Evidence Of Collusion Between Appropriate Public Officers Or Employees Of The Procuring Entity, Or Between The Bac And Any Of The Bidders, Or If The Collusion Is Between Or Among The Bidders Themselves, Or Between A Bidder And A Third Party, Including Any Act Which Restricts, Suppresses Or Nullifies Or Tends To Restrict, Suppress Or Nullify Competition; (b) If The Bac Is Found To Have Failed In Following The Prescribed Bidding Procedures; Or (c) For Any Justifiable And Reasonable Ground Where The Award Of The Contract Will Not Redound To The Benefit Of The Government As Follows: (i) If The Physical And Economic Conditions Have Significantly Changed So As To Render The Project No Longer Economically, Financially Or Technically Feasible As Determined By The Head Of The Procuring Entity; (ii) If The Project Is No Longer Necessary As Determined By The Head Of The Procuring Entity; And (iii) If The Source Of Funds For The Project Has Been Withheld Or Reduced Through No Fault Of The Procuring Entity. 27. Award Criteria 27.1. Subject To Itb Clause 25, The Procuring Entity Shall Award The Contract To The Successful Bidder Whose Bid Has Been Determined To Be The Lcrb. 28. Notice Of Award 28.1. The Procuring Entity Shall Issue A Written Notice Of Award/letter Of Acceptance To The Bidder With The Lcrb Prior To The Expiration Of The Bid Validity Period, By Registered Mail, By Hand Or By Facsimile. This Notice Of Award/letter Of Acceptance Shall State The Proposed Contract Price Equivalent To The Lcrb, Together With The Documentary Requirements For The Contract. 29. Signing Of The Contract 29.1. Within Ten (10) Calendar Days Upon Receipt Of The Award, The Successful Bidder Shall Submit To The Procuring Entity: (a) Its Written Confirmation To The Award; (b) The Contract Form Signed By The Bidder; (c) The Required Performance Security; And (d) All Other Documentary Requirements For The Contract. 29.2. Within Twenty (20) Calendar Days Upon Receipt From The Successful Bidder Of The Signed Confirmation Of The Award, The Signed Contract, The Required Performance Security And All Other Documentary Requirements, The Procuring Entity Shall Sign And Approve The Contract. 30. Performance Security 30.1. Within A Maximum Period Of Ten (10) Calendar Days Upon Receipt Of The Notification Of Award From The Procuring Entity, And In No Case Later Than The Signing Of The Contract By The Successful Bidder And The Procuring Entity, The Successful Bidder Shall Furnish To The Procuring Entity, The Performance Security In Accordance With The Conditions Of Contract, In The Performance Security Form Provided In The Bidding Documents, Or In Another Form Acceptable To The Procuring Entity. 30.2. As Indicated In The Bds, The Procuring Entity Shall Prescribe The Acceptable Forms Of Performance Security From Among The Following, From Which Acceptable Forms The Bidder May Choose: (a) Cash; (b) A Cashier’s Or Certified Check; (c) An Irrevocable Letter Of Credit; (d) A Bank Guarantee; (e) Surety Bond; Or (f) Foreign Government Guarantee. 30.3. If The Acceptable Performance Security Is Provided By The Successful Bidder In The Form Of A Bank Guarantee, Or Other Form If Indicated In Scc Clause 7.1, It Shall Be Issued Either (a) At The Bidder’s Option, By A Bank Located In The Country Of The Procuring Entity Or A Foreign Bank Through A Correspondent Bank Located In The Country Of The Procuring Entity, Or (b) With The Agreement Of The Procuring Entity Directly By A Foreign Bank Acceptable To The Procuring Entity. 30.4. Failure Of The Successful Bidder To Comply With The Requirements Of Itb Clause 30.1 Shall Constitute Sufficient Grounds For Cancellation Of The Award And Forfeiture Of The Bid Security. In Which Event, The Procuring Entity Shall Initiate And Complete The Post Qualification Of The Second Lowest Calculated Bid. The Procedure Shall Be Repeated Until The Lowest Calculated And Responsive Bid Is Identified And Selected For Contract Award. However, If No Bidder Passed Post-qualification, The Bac Shall Declare The Bidding A Failure And Conduct A Re-bidding With Re-advertisement. 30.5. Upon The Furnishing By The Successful Bidder Of The Performance Security, The Procuring Entity Will Promptly Notify The Other Bidders That Their Bids Have Been Unsuccessful. 31. Notice To Proceed 31.1. Within Seven (7) Calendar Days From The Date Of Approval Of The Contract By The Appropriate Government Approving Authority, The Procuring Entity Shall Issue Its Notice To Proceed. 32. Advance Payment 32.1. The Procuring Entity Will Provide An Advance Payment On The Contract Price As Stipulated In The Conditions Of Contract, Subject To The Maximum Amount Stated In Scc Clause 38.1. Part Ii. Section Ii. Bid Data Sheet Itb Clause 1.1 The Procuring Entity Is Municipality Of Carmen, Surigao Del Sur The Name Of The Contract Is Completion Of Concrete Perimeter Fence At Evacuation Center 5.3 The Procuring Entity’s Address Is: Local Government Unit Carmen, Surigao Del Sur Hon. Jane V. Plaza - Municipal Mayor 7.1 All Bids Submitted Will Be Opened At The Bid Opening Ceremony. Determination Of A Bidder’s Qualifications And Eligibility Will Form Part Of The Procuring Entity’s Evaluation Process And Post-qualification. During Bid Opening Technical Proposals That Lack Any Of The Following Documents Shall Be Rejected And Returned To The Bidder Together With Its Unopened Price Proposal: A) Evidence Of Financial, Technical And Production Capability; (minimum Equipment Required) B) Audited Financial Statements; C) Nfcc Or Credit Line Certificate Or Cash Deposit Certificate; D) Bid Security; And E) Authority Of The Signatory. 10.1 F) 10.1(a.11) Minimum Required Equipment 10.1(a.11) Ten Percent (10%) Of The Bid Amount. Note: If The Bidder, At Its Own Option Provides A Cash Deposit Certificate It Must Be At Least Ten Percent (10%) Of The Bid Amount 10.1(a.15) None. 10.1(b.4) None. 10.2 There Is No Ceiling For Financial Proposals. 11.4 Bid Prices Shall Be Fixed; Adjustable Financial Proposals Will Be Rejected. 12.1 For Goods And Services That Will Be Supplied From Outside Of The Philippines. Bid Prices Therefore Shall Be Quoted In United States Dollars. 13.1 Bids Will Be Valid Until 120 Calendar Days From The Date Of Bid Opening. 13.3 If The Period Of Bid Validity Is Extended Beyond Sixty (60) Days After The Original Bid Validity Period; Or In The Request For Extension, For The Period Of Delay Beyond Sixty (60) Days After The Expiry Of The Initial Bid Validity, Up To The Notification Of Award, Bid Prices Shall Be Increased On The Local Component By 3% Per Annum. Bid Evaluation Will Be Based On The Bid Prices Without Taking The Above Correction Into Consideration. 14.1 And 14.2 The Bid Security Shall Be In The Following Forms And Amount: (a) Cash, Certified (cashier’s Or Manager’s) Check At One Percent (1%) Of The Bid; And (b) Bank Guarantee At One And A Half Percent (1.5%) Of The Bid; (c) Bid Securing Declaration 14.3 And 14.5 One Hundred Twenty (120) Days From The Date Set For Bid Opening. 14.6(d) The Following Shall Be The Additional Grounds For Forfeiture Of The Bid Security: 1. Submission Of Eligibility Requirements Containing False Information Or Falsified Documents. 2. Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding. 3. Allowing The Use Of One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding. 4. Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After He Had Been Adjudged As Having Submitted The Lowest Calculated Responsive Bid Or Highest Rated Responsive Bid. 5. Refusal To Clarify Or Validate In Writing Its Bid During Post-qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification. 6. Any Documented Unsolicited Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor. 7. All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As An Eligible Contractor Not Buying Bid Documents, And Contractors Habitually Withdrawing From Bidding Or Submitting Letters Of Non-participation For At Least Three (3) Times Within A Year, Except For Valid Reasons. 15.1 None 16.4 No Further Instructions. 17.2(d) The Specific Identification Of This Bidding Process Is 18.1 The Address For Submission Of Bids Is Bac Office, Municipal Hall, Carmen, Surigao Del Sur. The Deadline For Submission Of Bids Is February 19, 2025 At 10:00 Am 21.1 The Place Of Bid Opening Is Bac Office, Municipal Hall, Carmen, Surigao Del Sur. The Date And Time Of Bid Opening Is February 19, 2025 At 10:00 Am 24.1 Not Applicable. Part Ii. Section Iii. General Conditions Of Contract Table Of Contents 1. Definitions 42 2. Interpretation 44 3. Governing Language And Law 45 4. Communications 45 5. Possession Of Site 45 6. The Contractor’s Obligations 46 7. Performance Security 47 8. Sub-contracting 47 9. Liquidated Damages 48 10. Site Investigation Reports 48 11. The Procuring Entity, Licenses And Permits 48 12. Contractor’s Risk And Warranty Security 48 13. Procuring Entity’s Risk 50 14. Insurance 51 15. Termination For Default Of Contractor 52 16. Termination For Default Of Procuring Entity 53 17. Termination For Other Causes 53 18. Procedures For Termination Of Contracts 55 19. Force Majeure, Release From Performance 56 20. Resolution Of Disputes 57 21. Suspension Of Loan, Credit, Grant, Or Appropriation 58 22. Procuring Entity’s Representative’s Decisions 58 23. Approval Of Drawings And Temporary Works By The Procuring Entity’s Representative 58 24. Acceleration And Delays Ordered By The Procuring Entity’s Representative 58 25. Extension Of The Intended Completion Date 59 26. Right To Vary 59 27. Contractors Right To Claim 60 28. Dayworks 60 29. Early Warning 60 30. Program Of Work 60 31. Management Conferences 61 32. Bill Of Quantities 61 33. Instructions, Inspections And Audits 62 34. Identifying Defects 62 35. Cost Of Repairs 62 36. Correction Of Defects 63 37. Uncorrected Defects 63 38. Advance Payment 63 39. Progress Payments 64 40. Payment Certificates 64 41. Retention 65 42. Variation Orders 65 43. Contract Completion 67 44. Suspension Of Work 67 45. Payment On Termination 68 46. Extension Of Contract Time 69 47. Price Adjustment 70 48. Completion 70 49. Taking Over 70 50. Operating And Maintenance Manuals 71 1. Definitions 1.1. For Purposes Of This Clause, Boldface Type Is Used To Identify Defined Terms. 1.2. The Arbiter Is The Person Appointed Jointly By The Procuring Entity And The Contractor To Resolve Disputes In The First Instance, As Provided For In Gcc Clause 20. 1.3. Bill Of Quantities Refers To A List Of The Specific Items Of The Work And Their Corresponding Unit Prices, Lump Sums, And/or Provisional Sums. 1.4. The Completion Date Is The Date Of Completion Of The Works As Certified By The Procuring Entity’s Representative, In Accordance With Gcc Clause 48. 1.5. The Contract Is The Contract Between The Procuring Entity And The Contractor To Execute, Complete, And Maintain The Works. It Consists Of The Documents Listed In Gcc Clause 2.3. 1.6. The Contract Price Is The Price Stated In The Letter Of Acceptance And Thereafter To Be Paid By The Procuring Entity To The Contractor For The Execution Of The Works In Accordance With This Contract. 1.7. Contract Time Extension Is The Allowable Period For The Contractor To Complete The Works In Addition To The Original Completion Date Stated In This Contract. 1.8. The Contractor Is The Juridical Entity Whose Proposal Has Been Accepted By The Procuring Entity And To Whom The Contract To Execute The Work Was Awarded. 1.9. The Contractor’s Bid Is The Signed Offer Or Proposal Submitted By The Contractor To The Procuring Entity In Response To The Bidding Documents. 1.10. Days Are Calendar Days; Months Are Calendar Months. 1.11. Day Works Are Varied Work Inputs Subject To Payment On A Time Basis For The Contractor’s Employees And Equipment, In Addition To Payments For Associated Materials And Plant. 1.12. A Defect Is Any Part Of The Works Not Completed In Accordance With The Contract. 1.13. The Defects Liability Certificate Is The Certificate Issued By Procuring Entity’s Representative Upon Correction Of Defects By The Contractor. 1.14. The Defects Liability Period Is The One Year Period Between Project Completion And Final Acceptance Within Which The Contractor Assumes The Responsibility To Undertake The Repair Of Any Damage To The Works At His Own Expense. 1.15. Drawings Are Graphical Presentations Of The Works. They Include All Supplementary Details, Shop Drawings, Calculations, And Other Information Provided Or Approved For The Execution Of This Contract. 1.16. Equipment Refers To All Facilities, Supplies, Appliances, Materials Or Things Required For The Execution And Completion Of The Work Provided By The Contractor And Which Shall Not Form Or Are Not Intended To Form Part Of The Permanent Works. 1.17. The Intended Completion Date Refers To The Date Specified In The Scc When The Contractor Is Expected To Have Completed The Works. The Intended Completion Date May Be Revised Only By The Procuring Entity’s Representative By Issuing An Extension Of Time Or An Acceleration Order. 1.18. Materials Are All Supplies, Including Consumables, Used By The Contractor For Incorporation In The Works. 1.19. The Notice To Proceed Is A Written Notice Issued By The Procuring Entity Or The Procuring Entity’s Representative To The Contractor Requiring The Latter To Begin The Commencement Of The Work Not Later Than A Specified Or Determinable Date. 1.20. Permanent Works All Permanent Structures And All Other Project Features And Facilities Required To Be Constructed And Completed In Accordance With This Contract Which Shall Be Delivered To The Procuring Entity And Which Shall Remain At The Site After The Removal Of All Temporary Works. 1.21. Plant Refers To The Machinery, Apparatus, And The Like Intended To Form An Integral Part Of The Permanent Works. 1.22. The Procuring Entity Is The Party Who Employs The Contractor To Carry Out The Works Stated In The Scc. 1.23. The Procuring Entity’s Representative Refers To The Head Of The Procuring Entity Or His Duly Authorized Representative, Identified In The Scc, Who Shall Be Responsible For Supervising The Execution Of The Works And Administering This Contract. 1.24. The Site Is The Place Provided By The Procuring Entity Where The Works Shall Be Executed And Any Other Place Or Places Which May Be Designated In The Scc, Or Notified To The Contractor By The Procuring Entity’s Representative As Forming Part Of The Site. 1.25. Site Investigation Reports Are Those That Were Included In The Bidding Documents And Are Factual And Interpretative Reports About The Surface And Subsurface Conditions At The Site. 1.26. Slippage Is A Delay In Work Execution Occurring When Actual Accomplishment Falls Below The Target As Measured By The Difference Between The Scheduled And Actual Accomplishment Of The Work By The Contractor As Established From The Work Schedule. This Is Actually Described As A Percentage Of The Whole Works. 1.27. Specifications Means The Description Of Works To Be Done And The Qualities Of Materials To Be Used, The Equipment To Be Installed And The Mode Of Construction. 1.28. The Start Date, As Specified In The Scc, Is The Date When The Contractor Is Obliged To Commence Execution Of The Works. It Does Not Necessarily Coincide With Any Of The Site Possession Dates. 1.29. A Subcontractor Is Any Person Or Organization To Whom A Part Of The Works Has Been Subcontracted By The Contractor, As Allowed By The Procuring Entity, But Not Any Assignee Of Such Person. 1.30. Temporary Works Are Works Designed, Constructed, Installed, And Removed By The Contractor That Are Needed For Construction Or Installation Of The Permanent Works. 1.31. Work(s) Refer To The Permanent Works And Temporary Works To Be Executed By The Contractor In Accordance With This Contract, Including (i) The Furnishing Of All Labor, Materials, Equipment And Others Incidental, Necessary Or Convenient To The Complete Execution Of The Works; (ii) The Passing Of Any Tests Before Acceptance By The Procuring Entity’s Representative; (iii) And The Carrying Out Of All Duties And Obligations Of The Contractor Imposed By This Contract As Described In The Scc. 2. Interpretation 2.1. In Interpreting The Conditions Of Contract, Singular Also Means Plural, Male Also Means Female Or Neuter, And The Other Way Around. Headings Have No Significance. Words Have Their Normal Meaning Under The Language Of This Contract Unless Specifically Defined. The Procuring Entity’s Representative Will Provide Instructions Clarifying Queries About The Conditions Of Contract. 2.2. If Sectional Completion Is Specified In The Scc, References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 2.3. The Documents Forming This Contract Shall Be Interpreted In The Following Order Of Priority: (a) Contract Agreement; (b) Instructions To Bidders; (c) Addenda To The Bidding Documents; (d) Specifications; (e) Drawings; (f) Special Conditions Of Contract; (g) General Conditions Of Contract; And (h) Any Other Document Listed In The Scc As Forming Part Of This Contract. 3. Governing Language And Law 3.1. This Contract Has Been Executed In The English Language, Which Shall Be The Binding And Controlling Language For All Matters Relating To The Meaning Or Interpretation Of This Contract. All Correspondence And Other Documents Pertaining To This Contract Which Are Exchanged By The Parties Shall Be Written In English. 3.2. This Contract Shall Be Interpreted In Accordance With The Laws Of The Republic Of The Philippines. 4. Communications 4.1. Communications Between Parties That Are Referred To In The Conditions Shall Be Effective Only When In Writing. A Notice Shall Be Effective Only When It Is Received By The Concerned Party. 5. Possession Of Site 5.1. On The Date Specified In The Scc, The Procuring Entity Shall Grant The Contractor Possession Of So Much Of The Site As May Be Required To Enable It To Proceed With The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 5.2. If Possession Of A Portion Is Not Given By The Date Stated In The Scc Clause 5.1, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contact Time To Address Such Delay Shall Be In Accordance With Gcc Clause 46. 5.3. The Contractor Shall Bear All Costs And Charges For Special Or Temporary Right-of-way Required By It In Connection With Access To The Site. The Contractor Shall Also Provide At His Own Cost Any Additional Facilities Outside The Site Required By It For Purposes Of The Works. 5.4. The Contractor Shall Allow The Procuring Entity’s Representative And Any Person Authorized By The Procuring Entity’s Representative Access To The Site And To Any Place Where Work In Connection With This Contract Is Being Carried Out Or Is Intended To Be Carried Out. 6. The Contractor’s Obligations 6.1. The Contractor Shall Carry Out The Works Properly And In Accordance With This Contract. The Contractor Shall Provide All Supervision, Labor, Materials, Plant And Contractor's Equipment, Which May Be Required. All Materials And Plant On Site Shall Be Deemed To Be The Property Of The Procuring Entity. 6.2. The Contractor Shall Commence Execution Of The Works On The Start Date And Shall Carry Out The Works In Accordance With The Program Of Work Submitted By The Contractor, As Updated With The Approval Of The Procuring Entity’s Representative, And Complete Them By The Intended Completion Date. 6.3. The Contractor Shall Be Responsible For The Safety Of All Activities On The Site. 6.4. The Contractor Shall Carry Out All Instructions Of The Procuring Entity’s Representative That Comply With The Applicable Laws Where The Site Is Located. 6.5. The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel, As Referred To In The Scc, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 6.6. If The Procuring Entity’s Representative Asks The Contractor To Remove A Member Of The Contractor’s Staff Or Work Force, For Justifiable Cause, The Contractor Shall Ensure That The Person Leaves The Site Within Seven (7) Days And Has No Further Connection With The Work In This Contract. 6.7. During Contract Implementation, The Contractor And His Subcontractors Shall Abide At All Times By All Labor Laws, Including Child Labor Related Enactments, And Other Relevant Rules. 6.8. The Contractor Shall Submit To The Procuring Entity For Consent The Name And Particulars Of The Person Authorized To Receive Instructions On Behalf Of The Contractor. 6.9. The Contractor Shall Cooperate And Share The Site With Other Contractors, Public Authorities, Utilities, And The Procuring Entity Between The Dates Given In The Schedule Of Other Contractors Particularly When They Shall Require Access To The Site. The Contractor Shall Also Provide Facilities And Services For Them During This Period. The Procuring Entity May Modify The Schedule Of Other Contractors, And Shall Notify The Contractor Of Any Such Modification Thereto. 6.10. Should Anything Of Historical Or Other Interest Or Of Significant Value Be Unexpectedly Discovered On The Site, It Shall Be The Property Of The Procuring Entity. The Contractor Shall Notify The Procuring Entity’s Representative Of Such Discoveries And Carry Out The Procuring Entity’s Representative’s Instructions In Dealing With Them. 7. Performance Security 7.1. The Performance Security Shall Be Submitted To The Procuring Entity Not Later Than The Date Specified In The Letter Of Acceptance And Shall Be Issued In An Amount And Form As Specified In The Scc, And Denominated In The Currency In Which The Contract Price Is Payable. The Performance Security Shall Be Valid For The Period Specified In The Scc. 7.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Act 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 8. Sub-contracting 8.1. Unless Otherwise Indicated In The Scc, The Contractor Cannot Subcontract More Than Fifty Percent (50%) Of The Value Of The Works,. Subcontracting Of Any Portion Of The Works Does Not Relieve The Contractor Of Any Liability Or Obligation Under This Contract. The Contractor Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants Or Workmen. 8.2. All Subcontracting Arrangements As Disclosed And Identified During The Eligibility Check Shall Not Be Changed During The Implementation Of This Contract. 9. Liquidated Damages 9.1. The Contractor Shall Pay Liquidated Damages To The Procuring Entity At The Rate Per Day Stated In The Scc For Each Day That The Completion Date Is Later Than The Intended Completion Date. The Total Amount Of Liquidated Damages Shall Not Exceed The Amount Defined In The Scc. The Procuring Entity May Deduct Liquidated Damages From Payments Due To The Contractor. Payment Of Liquidated Damages Shall Not Affect The Contractor. Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of This Contract, The Procuring Entity Shall Rescind This Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. 9.2. If The Intended Completion Date Is Extended After Liquidated Damages Have Been Paid, The Engineer Of The Procuring Entity Shall Correct Any Overpayment Of Liquidated Damages By The Contractor By Adjusting The Next Payment Certificate. The Contractor Shall Be Paid Interest On The Overpayment, Calculated From The Date Of Payment To The Date Of Repayment, At The Rates Specified In Gcc Clause 39.1 10. Site Investigation Reports 10.1. The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 11. The Procuring Entity, Licenses And Permits 11.1. The Procuring Entity Shall, If Requested By The Contractor, Assist Him In Applying For Permits, Licenses Or Approvals, Which Are Required For The Works. 12. Contractor’s Risk And Warranty Security 12.1. The Contractor Shall Assume Full Responsibility For The Works From The Time Project Construction Commenced Up To Final Acceptance By The Procuring Entity And Shall Be Held Responsible For Any Damage Or Destruction Of The Works Except Those Occasioned By Force Majeure. The Contractor Shall Be Fully Responsible For The Safety, Protection, Security, And Convenience Of His Personnel, Third Parties, And The Public At Large, As Well As The Works, Equipment, Installation, And The Like To Be Affected By His Construction Work. 12.2. The Defects Liability Period For Infrastructure Projects Shall Be One Year From Project Completion Up To Final Acceptance By The Procuring Entity. During This Period, The Contractor Shall Undertake The Repair Works, At His Own Expense, Of Any Damage To The Works On Account Of The Use Of Materials Of Inferior Quality Within Ninety (90) Days From The Time The Head Of The Procuring Entity Has Issued An Order To Undertake Repair. In Case Of Failure Or Refusal To Comply With This Mandate, The Procuring Entity Shall Undertake Such Repair Works And Shall Be Entitled To Full Reimbursement Of Expenses Incurred Therein Upon Demand. In Case The Contractor Fails To Comply With The Preceding Paragraph, It Shall Suffer Perpetual Disqualification From Participating In Any Public Bidding And Its Property Or Properties Shall Be Subject To Attachment Or Garnishment Proceedings To Recover The Costs. All Payables Of The Procuring Entity In The Contractor’s Favor Shall Be Offset To Recover The Costs. 12.3. After Final Acceptance Of The Works By The Procuring Entity, The Contractor Shall Be Held Responsible For Structural Defects And/or Failure Of The Completed Project Within The Following Warranty Periods From Final Acceptance, Except Those Occasioned By Force Majeure And Those Caused By Other Parties: (a) Permanent Structures: Fifteen (15) Years Buildings Of Types 4 (steel, Iron, Concrete, Or Masonry Construction With Walls, Ceilings, And Permanent Partitions Of Incombustible Fire Resistance) And 5 (steel, Iron, Concrete, Or Masonry Construction), Steel And Concrete Bridges, Flyovers, Concrete Aircraft Movement Areas, Ports, Dams, Diversion Tunnels, Causeways, Wharves, Piers, Dikes, Filtration And Treatment Plants, Sewerage Systems, Power Plants, Transmission And Communication Towers, Railway System, And Other Similar Structures; (b) Semi-permanent Structures: Five (5) Years Buildings Of Types 1 (wooden), 2 (wood With 1 Hour Fire Resistance), And 3 (masonry And Wood Construction), Concrete Roads, Asphalt Roads, River Control, Drainage, Irrigation And Drainage Canals, Municipal Ports And River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Structures; And (c) Other Structures: Two (2) Years Bailey And Wooden Bridges, Shallow Wells, Spring Developments, And Other Similar Structures. 12.4. The Contractor Shall Be Required To Put Up A Warranty Security In The Form Of Cash, Bank Guarantee, Letter Of Credit, Gsis Or Surety Bond Callable On Demand, In Accordance With The Following Schedule: Form Of Warranty Minimum Amount In Percentage (%) Of Total Contract Price 1. Cash Deposit, Cash Bond Or Letter Of Credit Five Percent (5%) 2. Bank Guarantee Ten Percent (10%) 3. Surety Bond Thirty Percent (30%) 12.5. The Warranty Security Shall Be Stated In Philippine Pesos And Shall Remain Effective During The Applicable Warranty Period Provided In Gcc Clause 12.3. 12.6. In Case Of Structural Defects/failure Occurring During The Applicable Warranty Period Provided In Gcc Clause 12.3, The Procuring Entity Shall Undertake The Necessary Restoration Or Reconstruction Works And Shall Be Entitled To Full Reimbursement By The Parties Found To Be Liable, Of Expenses Incurred Therein Upon Demand, Without Prejudice To The Filing Of Appropriate Administrative, Civil, And/or Criminal Charges Against The Responsible Persons As Well As The Forfeiture Of The Warranty Security Posted In Favor Of The Procuring Entity. For Purposes Of This Clause, The Term “structural Defects” Shall Mean Major Faults/flaws/deficiencies In One Or More Key Structural Elements Of The Works Which May Lead To Structural Failure Of The Completed Elements Or Structure. The Term “structural Failures” Is Defined As An Occurrence Where One Or More Key Structural Elements In An Infrastructure Facility Fails Or Collapses, Thereby Rendering The Facility Or Part Thereof Incapable Of Withstanding The Design Loads, And/or Endangering The Safety Of The Users Or The General Public. 13. Procuring Entity’s Risk 13.1. From The Start Date Until The Certificate Of Final Acceptance Has Been Issued, The Following Are Risks Of The Procuring Entity: (a) The Risk Of Personal Injury, Death, Or Loss Of Or Damage To Property (excluding The Works, Plant, Materials, And Equipment), Which Are Due To: (a.1) Any Type Of Use Or Occupation Of The Site Authorized By The Procuring Entity After The Official Acceptance Of The Works; Or (a.2) Negligence, Breach Of Statutory Duty, Or Interference With Any Legal Right By The Procuring Entity Or By Any Person Employed By Or Contracted To Him Except The Contractor. (b) The Risk Of Damage To The Works, Plant, Materials, And Equipment To The Extent That It Is Due To A Fault Of The Procuring Entity Or In The Procuring Entity’s Design, Or Due To War Or Radioactive Contamination Directly Affecting The Country Where The Works Are To Be Executed. 14. Insurance 14.1. The Contractor Shall, Under His Name And At His Own Expense, Obtain And Maintain, For The Duration Of This Contract, The Following Insurance Coverage: (a) Contractor’s All Risk Insurance; (b) Transportation To The Project Site Of Equipment, Machinery, And Supplies Owned By The Contractor; (c) Personal Injury Or Death Of Contractor’s Employees; And (d) Comprehensive Insurance For Third Party Liability To Contractor’s Direct Or Indirect Act Or Omission Causing Damage To Third Persons. 14.2. The Contractor Shall Provide Evidence To The Procuring Entity’s Representative That The Insurances Required Under This Contract Have Been Effected And Shall, Within A Reasonable Time, Provide Copies Of The Insurance Policies To The Procuring Entity’s Representative. Such Evidence And Such Policies Shall Be Provided To The Procuring Entity Through The Procuring Entity’s Representative. 14.3. The Contractor Shall Notify The Insurers Of Changes In The Nature, Extent, Or Program For The Execution Of The Works And Ensure The Adequacy Of The Insurances At All Times In Accordance With The Terms Of This Contract And Shall Produce To The Procuring Entity’s Representative The Insurance Policies In Force Including The Receipts For Payment Of The Current Premiums. The Above Insurance Policies Shall Be Obtained From Any Reputable Insurance Company Approved By The Procuring Entity’s Representative. 14.4. If The Contractor Fails To Obtain And Keep In Force The Insurances Referred To Herein Or Any Other Insurance Which He May Be Required To Obtain Under The Terms Of This Contract, The Procuring Entity May Obtain And Keep In Force Any Such Insurances And Pay Such Premiums As May Be Necessary For The Purpose. From Time To Time, The Procuring Entity May Deduct The Amount It Shall Pay For Said Premiums Including Twenty Five Percent (25%) Therein From Any Monies Due, Or Which May Become Due, To The Contractor, Without Prejudice To The Procuring Entity Exercising Its Right To Impose Other Sanctions Against The Contractor Pursuant To The Provisions Of This Contract. 14.5. In The Event The Contractor Fails To Observe The Above Safeguards, The Procuring Entity May, At The Contractor’s Expense, Take Whatever Measure Is Deemed Necessary For Its Protection And That Of The Contractor’s Personnel And Third Parties, And/or Order The Interruption Of Dangerous Works. In Addition, The Procuring Entity May Refuse To Make The Payments Under Gcc Clause 39 Until The Contractor Complies With This Clause. 14.6. The Contractor Shall Immediately Replace The Insurance Policy Obtained As Required In This Contract, Without Need Of The Procuring Entity’s Demand, With A New Policy Issued By A New Insurance Company Acceptable To The Procuring Entity For Any Of The Following Grounds: (a) The Issuer Of The Insurance Policy To Be Replaced Has: (a.1) Become Bankrupt; (a.2) Been Placed Under Receivership Or Under A Management Committee; (a.3) Been Sued For Suspension Of Payment; Or (a.4) Been Suspended By The Insurance Commission And Its License To Engage In Business Or Its Authority To Issue Insurance Policies Cancelled; Or (b) Where Reasonable Grounds Exist That The Insurer May Not Be Able, Fully And Promptly, To Fulfill Its Obligation Under The Insurance Policy. 15. Termination For Default Of Contractor 15.1. The Procuring Entity Shall Terminate This Contract For Default When Any Of The Following Conditions Attend Its Implementation: 15.2. Due To The Contractor’s Fault And While The Project Is On-going, It Has Incurred Negative Slippage Of Fifteen Percent (15%) Or More In Accordance With Presidential Decree 1870, Regardless Of Whether Or Not Previous Warnings And Notices Have Been Issued For The Contractor To Improve His Performance; 15.3. Due To Its Own Fault And After This Contract Time Has Expired, The Contractor Incurs Delay In The Completion Of The Work After This Contract Has Expired; Or 15.4. The Contractor: (a) Abandons The Contract Works, Refuses Or Fails To Comply With A Valid Instruction Of The Procuring Entity Or Fails To Proceed Expeditiously And Without Delay Despite A Written Notice By The Procuring Entity; (b) Does Not Actually Have On The Project Site The Minimum Essential Equipment Listed On The Bid Necessary To Prosecute The Works In Accordance With The Approved Program Of Work And Equipment Deployment Schedule As Required For The Project; (c) Does Not Execute The Works In Accordance With This Contract Or Persistently Or Flagrantly Neglects To Carry Out Its Obligations Under This Contract; (d) Neglects Or Refuses To Remove Materials Or To Perform A New Work That Has Been Rejected As Defective Or Unsuitable; Or (e) Sub-lets Any Part Of This Contract Without Approval By The Procuring Entity. 15.5. All Materials On The Site, Plant, Equipment, And Works Shall Be Deemed To Be The Property Of The Procuring Entity If This Contract Is Rescinded Because Of The Contractor’s Default. 16. Termination For Default Of Procuring Entity 16.1. The Contractor May Terminate This Contract With The Procuring Entity If The Works Are Completely Stopped For A Continuous Period Of At Least Sixty (60) Calendar Days Through No Fault Of Its Own, Due To Any Of The Following Reasons: (a) Failure Of The Procuring Entity To Deliver, Within A Reasonable Time, Supplies, Materials, Right-of-way, Or Other Items It Is Obligated To Furnish Under The Terms Of This Contract; Or (b) The Prosecution Of The Work Is Disrupted By The Adverse Peace And Order Situation, As Certified By The Armed Forces Of The Philippines Provincial Commander And Approved By The Secretary Of National Defense. 17. Termination For Other Causes 17.1. The Procuring Entity May Terminate This Contract, In Whole Or In Part, At Any Time For Its Convenience. The Head Of The Procuring Entity May Terminate This Contract For The Convenience Of The Procuring Entity If He Has Determined The Existence Of Conditions That Make Project Implementation Economically, Financially Or Technically Impractical And/or Unnecessary, Such As, But Not Limited To, Fortuitous Event(s) Or Changes In Law And National Government Policies. 17.2. The Procuring Entity Or The Contractor May Terminate This Contract If The Other Party Causes A Fundamental Breach Of This Contract. 17.3. Fundamental Breaches Of Contract Shall Include, But Shall Not Be Limited To, The Following: (a) The Contractor Stops Work For Twenty Eight (28) Days When No Stoppage Of Work Is Shown On The Current Program Of Work And The Stoppage Has Not Been Authorized By The Procuring Entity’s Representative; (b) The Procuring Entity’s Representative Instructs The Contractor To Delay The Progress Of The Works, And The Instruction Is Not Withdrawn Within Twenty Eight (28) Days; (c) The Procuring Entity Shall Terminate This Contract If The Contractor Is Declared Bankrupt Or Insolvent As Determined With Finality By A Court Of Competent Jurisdiction. In This Event, Termination Will Be Without Compensation To The Contractor, Provided That Such Termination Will Not Prejudice Or Affect Any Right Of Action Or Remedy Which Has Accrued Or Will Accrue Thereafter To The Procuring Entity And/or The Contractor. In The Case Of The Contractor's Insolvency, Any Contractor's Equipment Which The Procuring Entity Instructs In The Notice Is To Be Used Until The Completion Of The Works; (d) A Payment Certified By The Procuring Entity’s Representative Is Not Paid By The Procuring Entity To The Contractor Within Eighty Four (84) Days From The Date Of The Procuring Entity’s Representative’s Certificate; (e) The Procuring Entity’s Representative Gives Notice That Failure To Correct A Particular Defect Is A Fundamental Breach Of Contract And The Contractor Fails To Correct It Within A Reasonable Period Of Time Determined By The Procuring Entity’s Representative; (f) The Contractor Does Not Maintain A Security, Which Is Required; (g) The Contractor Has Delayed The Completion Of The Works By The Number Of Days For Which The Maximum Amount Of Liquidated Damages Can Be Paid, As Defined In The Gcc Clause 9; And (h) In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To, The Following: (h.1) Corrupt, Fraudulent, Collusive And Coercive Practices As Defined In Itb Clause 2.1(a); (h.2) Drawing Up Or Using Forged Documents; (h.3) Using Adulterated Materials, Means Or Methods, Or Engaging In Production Contrary To Rules Of Science Or The Trade; And (h.4) Any Other Act Analogous To The Foregoing. 17.4. The Funding Source Or The Procuring Entity, As Appropriate, Will Seek To Impose The Maximum Civil, Administrative And/or Criminal Penalties Available Under The Applicable Law On Individuals And Organizations Deemed To Be Involved With Corrupt, Fraudulent, Or Coercive Practices. 17.5. When Persons From Either Party To This Contract Gives Notice Of A Fundamental Breach To The Procuring Entity’s Representative In Order To Terminate The Existing Contract For A Cause Other Than Those Listed Under Gcc Clause 17.3, The Procuring Entity’s Representative Shall Decide Whether The Breach Is Fundamental Or Not. 17.6. If This Contract Is Terminated, The Contractor Shall Stop Work Immediately, Make The Site Safe And Secure, And Leave The Site As Soon As Reasonably Possible. 18. Procedures For Termination Of Contracts 18.1. The Following Provisions Shall Govern The Procedures For The Termination Of This Contract: (a) Upon Receipt Of A Written Report Of Acts Or Causes Which May Constitute Ground(s) For Termination As Aforementioned, Or Upon Its Own Initiative, The Implementing Unit Shall, Within A Period Of Seven (7) Calendar Days, Verify The Existence Of Such Ground(s) And Cause The Execution Of A Verified Report, With All Relevant Evidence Attached; (b) Upon Recommendation By The Implementing Unit, The Head Of The Procuring Entity Shall Terminate This Contract Only By A Written Notice To The Contractor Conveying The Termination Of This Contract. The Notice Shall State: (b.1) That This Contract Is Being Terminated For Any Of The Ground(s) Afore-mentioned, And A Statement Of The Acts That Constitute The Ground(s) Constituting The Same; (b.2) The Extent Of Termination, Whether In Whole Or In Part; (b.3) An Instruction To The Contractor To Show Cause As To Why This Contract Should Not Be Terminated; And (b.4) Special Instructions Of The Procuring Entity, If Any. The Notice To Terminate Shall Be Accompanied By A Copy Of The Verified Report; (c) Within A Period Of Seven (7) Calendar Days From Receipt Of The Notice Of Termination, The Contractor Shall Submit To The Head Of The Procuring Entity A Verified Position Paper Stating Why The Contract Should Not Be Terminated. If The Contractor Fails To Show Cause After The Lapse Of The Seven (7) Day Period, Either By Inaction Or By Default, The Head Of The Procuring Entity Shall Issue An Order Terminating The Contract; (d) The Procuring Entity May, At Anytime Before Receipt Of The Bidder’s Verified Position Paper To Withdraw The Notice To Terminate If It Is Determined That Certain Items Or Works Subject Of The Notice Had Been Completed, Delivered, Or Performed Before The Contractor’s Receipt Of The Notice; (e) Within A Non-extendible Period Of Ten (10) Calendar Days From Receipt Of The Verified Position Paper, The Head Of The Procuring Entity Shall Decide Whether Or Not To Terminate This Contract. It Shall Serve A Written Notice To The Contractor Of Its Decision And, Unless Otherwise Provided In The Said Notice, This Contract Is Deemed Terminated From Receipt Of The Contractor Of The Notice Of Decision. The Termination Shall Only Be Based On The Ground(s) Stated In The Notice To Terminate; And (f) The Head Of The Procuring Entity May Create A Contract Termination Review Committee (ctrc) To Assist Him In The Discharge Of This Function. All Decisions Recommended By The Ctrc Shall Be Subject To The Approval Of The Head Of The Procuring Entity. 19. Force Majeure, Release From Performance 19.1. For Purposes Of This Contract The Terms “force Majeure” And “fortuitous Event” May Be Used Interchangeably. In This Regard, A Fortuitous Event Or Force Majeure Shall Be Interpreted To Mean An Event Which The Contractor Could Not Have Foreseen, Or Which Though Foreseen, Was Inevitable. It Shall Not Include Ordinary Unfavorable Weather Conditions; And Any Other Cause The Effects Of Which Could Have Been Avoided With The Exercise Of Reasonable Diligence By The Contractor. 19.2. If This Contract Is Discontinued By An Outbreak Of War Or By Any Other Event Entirely Outside The Control Of Either The Procuring Entity Or The Contractor, The Procuring Entity’s Representative Shall Certify That This Contract Has Been Discontinued. The Contractor Shall Make The Site Safe And Stop Work As Quickly As Possible After Receiving This Certificate And Shall Be Paid For All Works Carried Out Before Receiving It And For Any Work Carried Out Afterwards To Which A Commitment Was Made. 19.3. If The Event Continues For A Period Of Eighty Four (84) Days, Either Party May Then Give Notice Of Termination, Which Shall Take Effect Twenty Eight (28) Days After The Giving Of The Notice. 19.4. After Termination, The Contractor Shall Be Entitled To Payment Of The Unpaid Balance Of The Value Of The Works Executed And Of The Materials And Plant Reasonably Delivered To The Site, Adjusted By The Following: (a) Any Sum To Which The Contractor Is Entitled Under Gcc Clause 27.1; (b) The Cost Of His Suspension And Demobilization; (c) Any Sum To Which The Procuring Entity Is Entitled. 19.5. The Net Balance Due Shall Be Paid Or Repaid Within A Reasonable Time Period From The Time Of The Notice Of Termination. 20. Resolution Of Disputes 20.1. If The Contractor Believes That A Decision Taken By The Procuring Entity’s Representative Was Either Outside The Authority Given To The Procuring Entity’s Representative By This Contract Or That The Decision Was Wrongly Taken, The Decision Shall Be Referred To The Arbiter Indicated In The Scc Within Fourteen (14) Days Of The Notification Of The Procuring Entity’s Representative’s Decision. 20.2. Any And All Disputes Arising From The Implementation Of This Contract Covered By The R.a. 9184 And Its Irr-a Shall Be Submitted To Arbitration In The Philippines According To The Provisions Of Republic Act 9285, Otherwise Known As The “alternative Dispute Resolution Act Of 2004”: Provided, However, That, Disputes That Are Within The Competence Of The Construction Industry Arbitration Commission To Resolve Shall Be Referred Thereto. The Process Of Arbitration Shall Be Incorporated As A Provision In This Contract That Will Be Executed Pursuant To The Provisions Of The Act And Its Irr-a: Provided, Further, That, By Mutual Agreement, The Parties May Agree In Writing To Resort To Other Alternative Modes Of Dispute Resolution. Additional Instructions On Resolution Of Disputes, If Any, Shall Be Indicated In The Scc. 21. Suspension Of Loan, Credit, Grant, Or Appropriation 21.1. In The Event That The Funding Source Suspends The Loan, Credit, Grant, Or Appropriation To The Procuring Entity, From Which Part Of The Payments To The Contractor Are Being Made: (a) The Procuring Entity Is Obligated To Notify The Contractor Of Such Suspension Within Seven (7) Days Of Having Received The Suspension Notice. (b) If The Contractor Has Not Received Sums Due It For Work Already Done Within Forty Five (45) Days From The Time The Contractor’s Claim For Payment Has Been Certified By The Procuring Entity’s Representative, The Contractor May Immediately Issue A Suspension Of Work Notice In Accordance With Scc Clause 44.2. 22. Procuring Entity’s Representative’s Decisions 22.1. Except Where Otherwise Specifically Stated, The Procuring Entity’s Representative Will Decide Contractual Matters Between The Procuring Entity And The Contractor In The Role Representing The Procuring Entity. 22.2. The Procuring Entity’s Representative May Delegate Any Of His Duties And Responsibilities To Other People, Except To The Arbiter, After Notifying The Contractor, And May Cancel Any Delegation After Notifying The Contractor. 23. Approval Of Drawings And Temporary Works By The Procuring Entity’s Representative 23.1. All Drawings Prepared By The Contractor For The Execution Of The Temporary Works, Are Subject To Prior Approval By The Procuring Entity’s Representative Before Its Use. 23.2. The Contractor Shall Be Responsible For Design Of Temporary Works. 23.3. The Procuring Entity’s Representative’s Approval Shall Not Alter The Contractor’s Responsibility For Design Of The Temporary Works. 23.4. The Contractor Shall Obtain Approval Of Third Parties To The Design Of The Temporary Works, When Required By The Procuring Entity. 24. Acceleration And Delays Ordered By The Procuring Entity’s Representative 24.1. When The Procuring Entity Wants The Contractor To Finish Before The Intended Completion Date, The Procuring Entity’s Representative Will Obtain Priced Proposals For Achieving The Necessary Acceleration From The Contractor. If The Procuring Entity Accepts These Proposals, The Intended Completion Date Will Be Adjusted Accordingly And Confirmed By Both The Procuring Entity And The Contractor. 24.2. If The Contractor’s Financial Proposals For An Acceleration Are Accepted By The Procuring Entity, They Are Incorporated In The Contract Price And Treated As A Variation. 25. Extension Of The Intended Completion Date 25.1. The Procuring Entity’s Representative Shall Extend The Intended Completion Date If A Variation Is Issued Which Makes It Impossible For The Intended Completion Date To Be Achieved By The Contractor Without Taking Steps To Accelerate The Remaining Work, Which Would Cause The Contractor To Incur Additional Costs. Unless Specified In The Scc, No Payment Shall Be Made For Any Event Which May Warrant The Extension Of The Intended Completion Date. 25.2. The Procuring Entity’s Representative Shall Decide Whether And By How Much To Extend The Intended Completion Date Within Twenty One (21) Days Of The Contractor Asking The Procuring Entity’s Representative For A Decision Thereto After Fully Submitting All Supporting Information. If The Contractor Has Failed To Give Early Warning Of A Delay Or Has Failed To Cooperate In Dealing With A Delay, The Delay By This Failure Shall Not Be Considered In Assessing The New Intended Completion Date. 26. Right To Vary 26.1. The Procuring Entity’s Representative With The Prior Approval Of The Procuring Entity May Instruct Variations, Up To A Maximum Cumulative Amount Of Ten Percent (10%) Of The Original Contract Cost. 26.2. Variations Shall Be Valued As Follows: (a) At A Lump Sum Price Agreed Between The Parties; (b) Where Appropriate, At Rates In This Contract; (c) In The Absence Of Appropriate Rates, The Rates In This Contract Shall Be Used As The Basis For Valuation; Or Failing Which (d) At Appropriate New Rates, Equal To Or Lower Than Current Industry Rates And To Be Agreed Upon By Both Parties And Approved By The Head Of The Procuring Entity. 27. Contractors Right To Claim 27.1. If The Contractor Incurs Cost As A Result Of Any Of The Events Under Gcc Clause 13, The Contractor Shall Be Entitled To The Amount Of Such Cost. If As A Result Of Any Of The Said Events, It Is Necessary To Change The Works, This Shall Be Dealt With As A Variation. 28. Dayworks 28.1. Subject To Gcc Clause 42 On Variation Order, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 28.2. All Work To Be Paid For As Dayworks Shall Be Recorded By The Contractor On Forms Approved By The Procuring Entity’s Representative. Each Completed Form Shall Be Verified And Signed By The Procuring Entity’s Representative Within Two Days Of The Work Being Done. 28.3. The Contractor Shall Be Paid For Dayworks Subject To Obtaining Signed Dayworks Forms. 29. Early Warning 29.1. The Contractor Shall Warn The Procuring Entity’s Representative At The Earliest Opportunity Of Specific Likely Future Events Or Circumstances That May Adversely Affect The Quality Of The Work, Increase The Contract Price, Or Delay The Execution Of The Works. The Procuring Entity’s Representative May Require The Contractor To Provide An Estimate Of The Expected Effect Of The Future Event Or Circumstance On The Contract Price And Completion Date. The Estimate Shall Be Provided By The Contractor As Soon As Reasonably Possible. 29.2. The Contractor Shall Cooperate With The Procuring Entity’s Representative In Making And Considering Proposals For How The Effect Of Such An Event Or Circumstance Can Be Avoided Or Reduced By Anyone Involved In The Work And In Carrying Out Any Resulting Instruction Of The Procuring Entity’s Representative. 30. Program Of Work 30.1. Within The Time Stated In The Scc, The Contractor Shall Submit To The Procuring Entity’s Representative For Approval A Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. 30.2. An Update Of The Program Of Work Shall The Show The Actual Progress Achieved On Each Activity And The Effect Of The Progress Achieved On The Timing Of The Remaining Work, Including Any Changes To The Sequence Of The Activities. 30.3. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 30.4. The Procuring Entity’s Representative’s Approval Of The Program Of Work Shall Not Alter The Contractor’s Obligations. The Contractor May Revise The Program Of Work And Submit It To The Procuring Entity’s Representative Again At Any Time. A Revised Program Of Work Shall Show The Effect Of Any Approved Variations; And If Allowed, Any Compensation Event. 30.5. When The Program Of Work Is Updated, The Contractor Shall Provide The Procuring Entity’s Representative With An Updated Cash Flow Forecast. The Cash Flow Forecast Shall Include Different Currencies, As Defined In The Contract, Converted As Necessary Using The Contract Exchange Rates. 30.6. All Variations Shall Be Included In Updated Program Of Work Produced By The Contractor. 31. Management Conferences 31.1. Either The Procuring Entity’s Representative Or The Contractor May Require The Other To Attend A Management Conference. The Management Conference Shall Review The Plans For Remaining Work And Deal With Matters Raised In Accordance With The Early Warning Procedure. 31.2. The Procuring Entity’s Representative Shall Record The Business Of Management Conferences And Provide Copies Of The Record To Those Attending The Conference And To The Procuring Entity. The Responsibility Of The Parties For Actions To Be Taken Shall Be Decided By The Procuring Entity’s Representative Either At The Management Conference Or After The Management Conference And Stated In Writing To All Who Attended The Conference. 32. Bill Of Quantities 32.1. The Bill Of Quantities Shall Contain Items Of Work For The Construction, Installation, Testing, And Commissioning Of Work To Be Done By The Contractor. 32.2. The Bill Of Quantities Is Used To Calculate The Contract Price. The Contractor Is Paid For The Quantity Of The Work Done At The Rate In The Bill Of Quantities For Each Item. 32.3. If The Final Quantity Of Any Work Done Differs From The Quantity In The Bill Of Quantities For The Particular Item And Is Not More Than Twenty Five Percent (25%) Of The Original Quantity, Provided The Aggregate Changes For All Items Do Not Exceed Ten Percent (10%) Of The Contract Price, The Procuring Entity’s Representative Shall Make The Necessary Adjustments To Allow For The Changes Subject To Applicable Laws, Rules, And Regulations. 32.4. If Requested By The Procuring Entity’s Representative, The Contractor Shall Provide The Procuring Entity’s Representative With A Detailed Cost Breakdown Of Any Rate In The Bill Of Quantities. 33. Instructions, Inspections And Audits 33.1. The Procuring Entity’s Personnel Shall At All Reasonable Times During Construction Of The Work Be Entitled To Examine, Inspect, Measure And Test The Materials And Workmanship, And To Check The Progress Of The Construction. 33.2. If The Procuring Entity’s Representative Instructs The Contractor To Carry Out A Test Not Specified In The Specification To Check Whether Any Work Has A Defect And The Test Shows That It Does, The Contractor Shall Pay For The Test And Any Samples. If There Is No Defect, The Test Shall Be A Compensation Event. 33.3. The Contractor Shall Permit The Funding Source Named In The Scc To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Appointed By The Funding Source, If So Required By The Funding Source. 34. Identifying Defects 34.1. The Procuring Entity’s Representative Shall Check The Contractor’s Work And Notify The Contractor Of Any Defects That Are Found. Such Checking Shall Not Affect The Contractor’s Responsibilities. The Procuring Entity’s Representative May Instruct The Contractor To Search Uncover Defects And Test Any Work That The Procuring Entity’s Representative Considers Below Standards And Defective. 35. Cost Of Repairs 35.1. Loss Or Damage To The Works Or Materials To Be Incorporated In The Works Between The Start Date And The End Of The Defects Liability Periods Shall Be Remedied By The Contractor At The Contractor’s Cost If The Loss Or Damage Arises From The Contractor’s Acts Or Omissions. 36. Correction Of Defects 36.1. The Procuring Entity’s Representative Shall Give Notice To The Contractor Of Any Defects Before The End Of The Defects Liability Period, Which Begins At Completion Date Up To Final Acceptance By The Procuring Entity, Unless Otherwise Specified In The Scc. The Defects Liability Period Shall Be Extended For As Long As Defects Remain To Be Corrected. 36.2. Every Time Notice Of A Defect Is Given, The Contractor Shall Correct The Notified Defect Within The Length Of Time Specified In The Procuring Entity’s Representative’s Notice. 36.3. The Contractor Shall Correct The Defects Which He Notices Himself Before The End Of The Defects Liability Period. 36.4. The Procuring Entity Shall Certify That All Defects Have Been Corrected. If The Procuring Entity Considers That Correction Of A Defect Is Not Essential, He Can Request The Contractor To Submit A Quotation For The Corresponding Reduction In The Contract Price. If The Procuring Entity Accepts The Quotation, The Corresponding Change In The Scc Is A Variation. 37. Uncorrected Defects 37.1. The Procuring Entity Shall Give The Contractor At Least Fourteen (14) Days Notice Of His Intention To Use A Third Party To Correct A Defect. If The Contractor Does Not Correct The Defect Himself Within The Period, The Procuring Entity May Have The Defect Corrected By The Third Party. The Cost Of The Correction Will Be Deducted From The Contract Price. 37.2. The Use Of A Third Party To Correct Defects That Are Uncorrected By The Contractor Will In No Way Relieve The Contractor Of Its Liabilities And Warranties Under The Contract. 38. Advance Payment 38.1. The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not To Exceed Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum Or, At The Most Two, Installments According To A Schedule Specified In The Scc. 38.2. The Advance Payment Shall Be Made Only Upon The Submission To And Acceptance By The Procuring Entity Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, A Bank Guarantee Or A Surety Bond Callable Upon Demand, Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission And Confirmed By The Procuring Entity. 38.3. The Advance Payment Shall Be Repaid By The Contractor By Deducting A Percentage Equal To That Used For The Advance Payment From Periodic Progress Payments To Be Made To The Contractor. 38.4. The Contractor May Reduce His Standby Letter Of Credit Or Guarantee Instrument By The Amounts Refunded By The Monthly Certificates In The Advance Payment. 39. Progress Payments 39.1. The Contractor May Submit A Request For Payment For Work Accomplished. Such Request For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 39.2. The Procuring Entity Shall Have The Right To Deduct From The Contractor’s Progress Billing Such Amount As May Be Necessary To Cover Third Party Liabilities, As Well As Uncorrected Discovered Defects In The Project. 39.3. Payments Shall Be Adjusted By Deducting Therefrom The Amounts For Advance Payments And Retention. The Procuring Entity Shall Pay The Contractor The Amounts Certified By The Procuring Entity’s Representative Within Twenty Eight (28) Days From The Date Each Certificate Was Issued. Unless Otherwise Indicated In The Scc, No Payment Of Interest For Delayed Payments And Adjustments Shall Be Made By The Procuring Entity. 39.4. Items Of The Works For Which A Price Of “0” (zero) Has Been Entered Will Not Be Paid For By The Procuring Entity And Shall Be Deemed Covered By Other Rates And Prices In The Contract. 40. Payment Certificates 40.1. The Contractor Shall Submit To The Procuring Entity’s Representative Monthly Statements Of The Estimated Value Of The Work Executed Less The Cumulative Amount Certified Previously. 40.2. The Procuring Entity’s Representative Shall Check The Contractor’s Monthly Statement And Certify The Amount To Be Paid To The Contractor. 40.3. The Value Of Work Executed Shall: (a) Be Determined By The Procuring Entity’s Representative; (b) Comprise The Value Of The Quantities Of The Items In The Bill Of Quantities Completed; And (c) Include The Valuations Of Approved Variations. 40.4. The Procuring Entity’s Representative May Exclude Any Item Certified In A Previous Certificate Or Reduce The Proportion Of Any Item Previously Certified In Any Certificate In The Light Of Later Information. 41. Retention 41.1. The Procuring Entity Shall Retain From Each Payment Due To The Contractor An Amount Equal To A Percentage Thereof Using The Rate As Specified In Scc Clause 41.2. 41.2. Progress Payments Are Subject To Retention Of Ten Percent (10%), Unless Otherwise Specified In The Scc, Referred To As The “retention Money.” Such Retention Shall Be Based On The Total Amount Due To The Contractor Prior To Any Deduction And Shall Be Retained From Every Progress Payment Until Fifty Percent (50%) Of The Value Of Works, As Determined By The Procuring Entity, Are Completed. If, After Fifty Percent (50%) Completion, The Work Is Satisfactorily Done And On Schedule, No Additional Retention Shall Be Made; Otherwise, The Ten Percent (10%) Retention Shall Again Be Imposed Using The Rate Specified Therefor. 41.3. The Total “retention Money” Shall Be Due For Release Upon Final Acceptance Of The Works. The Contractor May, However, Request The Substitution Of The Retention Money For Each Progress Billing With Irrevocable Standby Letters Of Credit From A Commercial Bank, Bank Guarantees Or Surety Bonds Callable On Demand, Of Amounts Equivalent To The Retention Money Substituted For And Acceptable To The Procuring Entity, Provided That The Project Is On Schedule And Is Satisfactorily Undertaken. Otherwise, The Percentage Retained Shall Be Made. Said Irrevocable Standby Letters Of Credit, Bank Guarantees And/or Surety Bonds, To Be Posted In Favor Of The Procuring Entity Shall Be Valid For A Duration To Be Determined By The Concerned Implementing Office/agency Or Procuring Entity And Will Answer For The Purpose For Which The Retention Is Intended, I.e., To Cover Uncorrected Discovered Defects And Third Party Liabilities. 41.4. On Completion Of The Whole Works, The Contractor May Substitute Retention Money With An “on Demand” Bank Guarantee In A Form Acceptable To The Procuring Entity. 42. Variation Orders 42.1. Variation Orders May Be Issued By The Procuring Entity To Cover Any Increase/decrease In Quantities, Including The Introduction Of New Work Items That Are Not Included In The Original Contract Or Reclassification Of Work Items That Are Either Due To Change Of Plans, Design Or Alignment To Suit Actual Field Conditions Resulting In Disparity Between The Preconstruction Plans Used For Purposes Of Bidding And The “as Staked Plans” Or Construction Drawings Prepared After A Joint Survey By The Contractor And The Procuring Entity After Award Of The Contract, Provided That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. The Addition/deletion Of Works Should Be Within The General Scope Of The Project As Bid And Awarded. A Variation Order May Either Be In The Form Of A Change Order Or Extra Work Order. 42.2. A Change Order May Be Issued By The Implementing Official To Cover Any Increase/decrease In Quantities Of Original Work Items In The Contract. 42.3. An Extra Work Order May Be Issued By The Implementing Official To Cover The Introduction Of New Work Necessary For The Completion, Improvement Or Protection Of The Project Which Were Not Included As Items Of Work In The Original Contract, Such As, Where There Are Subsurface Or Latent Physical Conditions At The Site Differing Materially From Those Indicated In The Contract, Or Where There Are Duly Unknown Physical Conditions At The Site Of An Unusual Nature Differing Materially From Those Ordinarily Encountered And Generally Recognized As Inherent In The Work Or Character Provided For In The Contract. 42.4. Any Cumulative Variation Order Beyond Ten Percent (10%) Shall Be Subject Of Another Contract To Be Bid Out If The Works Are Separable From The Original Contract. In Exceptional Cases Where It Is Urgently Necessary To Complete The Original Scope Of Work, The Head Of The Procuring Entity May Authorize The Variation Order Beyond Ten Percent (10%) But Not More Than Twenty Percent (20%) Subject To The Guidelines To Be Determined By The Gppb: Provided, However, That Appropriate Sanctions Shall Be Imposed On The Designer, Consultant Or Official Responsible For The Original Detailed Engineering Design Which Failed To Consider The Variation Order Beyond Ten Percent (10%). 42.5. In Claiming For Any Variation Order, The Contractor Shall, Within Seven (7) Calendar Days After Such Work Has Been Commenced Or After The Circumstances Leading To Such Condition(s) Leading To The Extra Cost, And Within Twenty-eight (28) Calendar Days Deliver A Written Communication Giving Full And Detailed Particulars Of Any Extra Cost In Order That It May Be Investigated At That Time. Failure To Provide Either Of Such Notices In The Time Stipulated Shall Constitute A Waiver By The Contractor For Any Claim. The Preparation And Submission Of Variation Orders Are As Follows: (a) If The Head Of The Procuring Entity Believes That A Change Order Or Extra Work Order Should Be Issued, He Shall Prepare The Proposed Order Accompanied With The Notices Submitted By The Contractor, The Plans Therefore, His Computations As To The Quantities Of The Additional Works Involved Per Item Indicating The Specific Stations Where Such Works Are Needed, The Date Of His Inspections And Investigations Thereon, And The Log Book Thereof, And A Detailed Estimate Of The Unit Cost Of Such Items Of Work, Together With His Justifications For The Need Of Such Change Order Or Extra Work Order, And Shall Submit The Same To The Procuring Entity’s Representative. (b) The Procuring Entity’s Representative, Upon Receipt Of The Proposed Change Order Or Extra Work Order Shall Immediately Instruct The Technical Staff Of The Procuring Entity To Conduct An On-the-spot Investigation To Verify The Need For The Work To Be Prosecuted. A Report Of Such Verification Shall Be Submitted Directly To The Procuring Entity’s Representative. (c) The Procuring Entity’s Representative, After Being Satisfied That Such Change Order Or Extra Work Order Is Justified And Necessary, Shall Review The Estimated Quantities And Prices And Forward The Proposal With The Supporting Documentation To The Head Of Procuring Entity For Consideration. (d) If, After Review Of The Plans, Quantities And Estimated Unit Cost Of The Items Of Work Involved, The Proper Office Of The Procuring Entity Empowered To Review And Evaluate Change Orders Or Extra Work Orders Recommends Approval Thereof, The Procuring Entity’s Representative, Believing The Change Order Or Extra Work Order To Be In Order, Shall Approve The Same. (e) The Timeframe For The Processing Of Variation Orders From The Preparation Up To The Approval By The Head Of The Procuring Entity Concerned Shall Not Exceed Thirty (30) Calendar Days. 43. Contract Completion 43.1. Once The Project Reaches An Accomplishment Of Ninety Five (95%) Of The Total Contract Amount, The Procuring Entity May Create An Inspectorate Team To Make Preliminary Inspection And Submit A Punch-list To The Contractor In Preparation For The Final Turnover Of The Project. Said Punch-list Will Contain, Among Others, The Remaining Works, Work Deficiencies For Necessary Corrections, And The Specific Duration/time To Fully Complete The Project Considering The Approved Remaining Contract Time. This, However, Shall Not Preclude The Claim Of The Procuring Entity For Liquidated Damages. 44. Suspension Of Work 44.1. The Procuring Entity Shall Have The Authority To Suspend The Work Wholly Or Partly By Written Order For Such Period As May Be Deemed Necessary, Due To Force Majeure Or Any Fortuitous Events Or For Failure On The Part Of The Contractor To Correct Bad Conditions Which Are Unsafe For Workers Or For The General Public, To Carry Out Valid Orders Given By The Procuring Entity Or To Perform Any Provisions Of The Contract, Or Due To Adjustment Of Plans To Suit Field Conditions As Found Necessary During Construction. The Contractor Shall Immediately Comply With Such Order To Suspend The Work Wholly Or Partly. 44.2. The Contractor Or Its Duly Authorized Representative Shall Have The Right To Suspend Work Operation On Any Or All Projects/activities Along The Critical Path Of Activities After Fifteen (15) Calendar Days From Date Of Receipt Of Written Notice From The Contractor To The District Engineer/regional Director/consultant Or Equivalent Official, As The Case May Be, Due To The Following: (a) There Exist Right-of-way Problems Which Prohibit The Contractor From Performing Work In Accordance With The Approved Construction Schedule. (b) Requisite Construction Plans Which Must Be Owner-furnished Are Not Issued To The Contractor Precluding Any Work Called For By Such Plans. (c) Peace And Order Conditions Make It Extremely Dangerous, If Not Possible, To Work. However, This Condition Must Be Certified In Writing By The Philippine National Police (pnp) Station Which Has Responsibility Over The Affected Area And Confirmed By The Department Of Interior And Local Government (dilg) Regional Director. (d) There Is Failure On The Part Of The Procuring Entity To Deliver Government-furnished Materials And Equipment As Stipulated In The Contract. (e) Delay In The Payment Of Contractor’s Claim For Progress Billing Beyond Forty-five (45) Calendar Days From The Time The Contractor’s Claim Has Been Certified To By The Procuring Entity’s Authorized Representative That The Documents Are Complete Unless There Are Justifiable Reasons Thereof Which Shall Be Communicated In Writing To The Contractor. 44.3. In Case Of Total Suspension, Or Suspension Of Activities Along The Critical Path, Which Is Not Due To Any Fault Of The Contractor, The Elapsed Time Between The Effective Order Of Suspending Operation And The Order To Resume Work Shall Be Allowed The Contractor By Adjusting The Contract Time Accordingly. 45. Payment On Termination 45.1. If The Contract Is Terminated Because Of A Fundamental Breach Of Contract By The Contractor, The Procuring Entity’s Representative Shall Issue A Certificate For The Value Of The Work Done And Materials Ordered Less Advance Payments Received Up To The Date Of The Issue Of The Certificate And Less The Percentage To Apply To The Value Of The Work Not Completed, As Indicated In The Scc. Additional Liquidated Damages Shall Not Apply. If The Total Amount Due To The Procuring Entity Exceeds Any Payment Due To The Contractor, The Difference Shall Be A Debt Payable To The Procuring Entity. 45.2. If The Contract Is Terminated For The Procuring Entity’s Convenience Or Because Of A Fundamental Breach Of Contract By The Procuring Entity, The Procuring Entity’s Representative Shall Issue A Certificate For The Value Of The Work Done, Materials Ordered, The Reasonable Cost Of Removal Of Equipment, Repatriation Of The Contractor’s Personnel Employed Solely On The Works, And The Contractor’s Costs Of Protecting And Securing The Works, And Less Advance Payments Received Up To The Date Of The Certificate. 45.3. The Net Balance Due Shall Be Paid Or Repaid Within Twenty Eight (28) Days From The Notice Of Termination. 45.4. If The Contractor Has Terminated The Contract Under Gcc Clauses 16 Or 17, The Procuring Entity Shall Promptly Return The Performance Security To The Contractor. 46. Extension Of Contract Time 46.1. Should The Amount Of Additional Work Of Any Kind Or Other Special Circumstances Of Any Kind Whatsoever Occur Such As To Fairly Entitle The Contractor To An Extension Of Contract Time, The Procuring Entity Shall Determine The Amount Of Such Extension; Provided That The Procuring Entity Is Not Bound To Take Into Account Any Claim For An Extension Of Time Unless The Contractor Has, Prior To The Expiration Of The Contract Time And Within Thirty (30) Calendar Days After Such Work Has Been Commenced Or After The Circumstances Leading To Such Claim Have Arisen, Delivered To The Procuring Entity Notices In Order That It Could Have Investigated Them At That Time. Failure To Provide Such Notice Shall Constitute A Waiver By The Contractor Of Any Claim. Upon Receipt Of Full And Detailed Particulars, The Procuring Entity Shall Examine The Facts And Extent Of The Delay And Shall Extend The Contract Time Completing The Contract Work When, In The Procuring Entity’s Opinion, The Findings Of Facts Justify An Extension. 46.2. No Extension Of Contract Time Shall Be Granted The Contractor Due To (a) Ordinary Unfavorable Weather Conditions And (b) Inexcusable Failure Or Negligence Of Contractor To Provide The Required Equipment, Supplies Or Materials. 46.3. Extension Of Contract Time May Be Granted Only When The Affected Activities Fall Within The Critical Path Of The Pert/cpm Network. 46.4. No Extension Of Contract Time Shall Be Granted When The Reason Given To Support The Request For Extension Was Already Considered In The Determination Of The Original Contract Time During The Conduct Of Detailed Engineering And In The Preparation Of The Contract Documents As Agreed Upon By The Parties Before Contract Perfection. 46.5. Extension Of Contract Time Shall Be Granted For Rainy/unworkable Days Considered Unfavorable For The Prosecution Of The Works At The Site, Based On The Actual Conditions Obtained At The Site, In Excess Of The Number Of Rainy/unworkable Days Pre-determined By The Procuring Entity In Relation To The Original Contract Time During The Conduct Of Detailed Engineering And In The Preparation Of The Contract Documents As Agreed Upon By The Parties Before Contract Perfection, And/or For Equivalent Period Of Delay Due To Major Calamities Such As Exceptionally Destructive Typhoons, Floods, Earthquakes, And Epidemics, And For Causes Such As Non-delivery On Time Of Materials, Working Drawings, Or Written Information To Be Furnished By The Procuring Entity, Non-acquisition Of Permit To Enter Private Properties Within The Right-of-way Resulting In Complete Paralyzation Of Construction Activities, And Other Meritorious Causes As Determined By The Procuring Entity’s Representative And Approved By The Head Of The Procuring Entity. Shortage Of Construction Materials, General Labor Strikes, And Peace And Order Problems That Disrupt Construction Operations Through No Fault Of The Contractor May Be Considered As Additional Grounds For Extension Of Contract Time Provided They Are Publicly Felt And Certified By Appropriate Government Agencies Such As Dti, Dole, Dilg, And Dnd, Among Others. The Written Consent Of Bondsmen Must Be Attached To Any Request Of The Contractor For Extension Of Contract Time And Submitted To The Procuring Entity For Consideration And The Validity Of The Performance Security Shall Be Correspondingly Extended. 47. Price Adjustment 47.1. Except For Extraordinary Circumstances As Determined By Neda And Approved By The Gppb, No Price Adjustment Shall Be Allowed Unless Otherwise Specified In The Scc. 48. Completion 48.1. The Contractor Shall Request The Procuring Entity’s Representative To Issue A Certificate Of Completion Of The Works, And The Procuring Entity’s Representative Will Do So Upon Deciding That The Work Is Completed. 49. Taking Over 49.1. The Procuring Entity Shall Take Over The Site And The Works Within Seven (7) Days From The Date The Procuring Entity’s Representative Issues A Certificate Of Completion. 50. Operating And Maintenance Manuals 50.1. If “as Built” Drawings And/or Operating And Maintenance Manuals Are Required, The Contractor Shall Supply Them By The Dates Stated In The Scc. 50.2. If The Contractor Does Not Supply The Drawings And/or Manuals By The Dates Stated In The Scc, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative Shall Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Part Ii. Section Iv. Special Conditions Of Contract Gcc Clause 1.17 The Intended Completion Date Is 105 Calendar Days. 1.22 The Procuring Entity Is Municipality Of Carmen. 1.23 The Procuring Entity’s Representative Is Hon. Jane V. Plaza - Municipal Mayor. 1.24 The Site Is Located At Barangay Poblacion, Carmen, Surigao Del Sur And Is Defined In Drawings No. Sheet No. 01 Vicinity Map See Part Ii Section Vi. 1.28 The Start Date Is Within 10 Calendar Days Upon Receipt Of Ntp. 1.31 The Works Consist Of I. Construction Of Additional 75 Meters Perimeter Fence Ii. Finishing Works Of Existing Fence Iii. Construction/welding Of Steel Fence With Steel Matting As Main Fence Iv. Painting Works Of Inner Wall And Concrete Post Structures And All Steel Materials V. Installation Of Electrical Materials Vi. Construction Of 368m Drainage Canal 2.2 Not Applicable (h) The Other Documents Forming Part Of The Contract Are: None. 5.1 The Procuring Entity Shall Give Possession Of All Parts Of The Site To The Contractor Upon Issuance Of Ntp 6.5 The Contractor Shall Employ The Following Key Personnel: 1. Civil Engineer 2. Construction Foreman 3. Carpenter/mason/paintor 4. Equipment Operator 5. Laborers 6. Welders Equipment Needed: 1 Concrete Mixer, Welding Machine 1 Bar Cutter, Grinder 1 Concrete Vibrator 7.1 At The Contractor’s Option The Performance Security Is To Be In Any Of The Following Form: (a) Cash, Certified (cashier’s Or Manager’s) Check, In The Amount Of Five Percent (5%) Of The Contract Price; And (b) Bank Guarantee In The Amount Of Ten Percent (10%) Of The Contract Price. The Performance Security Shall Be Discharged By The Procuring Entity And Returned To The Contractor Not Later Than Thirty (30) Days Following The Date Of The Expiration Of This Contract. 8.1 No Further Instructions. 9.1 The Applicable Liquidated Damages Is At Least One Tenth (1/10) Of A Percent Of The Cost Of The Unperformed Portion For Every Day Of Delay. The Maximum Deduction Shall Be Ten Percent (10%) Of The Amount Of The Contract, The Procuring Entity Shall Rescind The Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. 10.1 The Site Investigation Reports Are: None 20.1 The Arbiter Is: Construction Industry Arbitration Commission Manila 20.2 No Further Instructions. 25.1 No Further Instructions. 28.1 No Day Works Are Applicable To The Contract. 30.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within [10] Days Of Delivery Of The Letter Of Acceptance. 30.3 The Period Between Program Of Work Updates Is [30] Days. The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is 1% Of The Progress Billing. 33.3 The Funding Source: 20% Ldf 2025 36.1 The Defects Liability Period Is One Year. 38.1 The Amount Of The Advance Payment Is 15% Of The Contract Price And To Be Recouped Every Progress Billing. 39.1 No Further Instructions. 39.3 No Further Instructions. 41.2 The Amount Of Retention Is Ten Percent (10%) Of The Contract Value. 47.1 No Further Instructions. 50.1 The Date By Which Operating And Maintenance Manuals Are Required Is : Not Applicable The Date By Which “as Built” Drawings Are Required Is : [within Fifteen (15) Days After Completion] 50.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings By The Date Required Is : [1% Of The Final Contract Amount] Part Ii. Section V. Specifications I. Site Clearing Site Clearing (before And After) 1 Lot Including Vegetation Controls And Alike Ii. Excavation And Filling Works Footing, Wall Footing Excavation 190 Cu.m Filling And Grading Of Soil Near The Fence Iii. Carpentry Works (forms, Scafolding) 100-2”x3”x16’ Lawaan 800 Bd.ft 100-2”x2”x16’ Lawaan 534 Bd.ft #cwn Assorted 80 Kls Marine Plywood 120 Pcs Iv. Concrete Works Portland Cement Type 1 280 Bags Washed Sand 22 Cu.m ¾” Screened Gravel 30 Cu.m V. Reinforcement Works 10mm Dsb 295 Le Of 6m 1079.7 Lg 12mm Dsb 740 Le Of 6m 3944.2 Kg #16 Tie Wire 100 Kg Vi. Masonry Works (walls And Finishing Works) 6” Chb 1100 Pcs Portland Cement 160 Bags Washed Sand 17 Cu.m Vii. Welding Works Steel Matting Wire Mesh 4”x8”, 4.5mm Thick Rod 137 Sheet G.i. Steel Tubular Type 2”x3”x6m Length, 1.5mm Thick 274 Pcs 12mm Steel Bars 504 Pcs 2”x1” Angle Bar 5mm Thick 6m Length 125 Pcs Grinding Disk 150 Pcs Bolts (connection For Steel To Concrete) 1500 Pcs Cutting Disk 100 Pcs Welding Rod 700 Pcs Viii. Painting Works Painting Of Walls (two Coats) 632.2 Sq.m Painting Of Steels (use Zinc Chromate For Tubular And Red Oxide For Steel Matting For First Coat) Used Epoxy Enamel For Top Coat. Black Use Color Black 675 Sq.m Ix. Electrical Works Thhn – Thwn Paciflex #10 10 Mts Thhn – Thwn Paciflex #12 9 Boxes Electrical Pvc Pipe #3/4 160 Le Heavy Duty Metal Conduit Clamp Gi Clamps Single #3/4 40 Pcs Electrical Pvc Elbow #3/4 30 Pcs Electrical Square Box Poly 70 Pcs Enclosure Boxn Surface Type 9 Way 161 Mm-w/ 255mm-i 1 Pc Mcb Circuit Breaker 20 Amps Ac 4 Pcs Mcb Circuit Breaker 40 Amps Ac 1 Pc Electrical Conduit Pipe Connector, Male Adapter W/ Lock Nut #3/4 6 Pcs Electrical Tape Big 20 Pcs 30 Watts Outdoor Street Light As Showed In Plan. With Holder (clamps) With Steel As Shown 65 Sets G.i. Pipe 2” Dia. X 6m Sched. 20 33 Pcs Welding Rod #6013 15 Boxes Anchor Bolt 5/8 X 8” With Nut And Washer 4 Pcs With 5mm 8” X 8” Steel Plate 65 Sets Steel Plate 5mm Thick 1 Sheet Cutting Disk For Steel 15 Pcs X. Billboard Project Billboard 1 Lot Xi. Temporary Facility 1 Lot Provision Of Bunk House Temporary Electrical Connection Temporary Water Supply Connection Part Ii. Section Vi. Drawings Part Ii. Section Vii. Bill Of Quantities Item Scope Of Works Unit Qty Unit Price Total Amount I Site Clearing Lot 1.00 Ii Excavation & Filling Works Lot 1.00 Iii Carpentry Works (forms, Scafolding) Lot 1.00 Iv Concrete Works Lot 1.00 V Reinforcement Works Kgs 5023.90 Vi Masonry Works (walls & Finishing Works) Lot 1.00 Vii Welding Works Lot 1.00 Viii Painting Works Sq.m 1307.20 Ix Electrical Works Lot 1.00 X Billboard Lot 1.00 Xi Temporary Facility Lot 1.00 Part Ii. Section Viii. Forms And Qualification Information Table Of Contents Bid Form 129 Form Of Bid Security (bank Guarantee) 131 Qualification Information 133 Letter Of Acceptance 136 Form Of Contract Agreement 137 Form Of Performance Security (bank Guarantee) 140 Bank Guarantee For Advance Payment 141 Affidavit Of Disclosure Of No Relationship 142 Bid Form Date: Iaeb No.: To: Alain P. Cabanilla Chairman, Bids And Awards Committee Carmen, Municipal Hall Poblacion, Carmen, Surigao Del Sur We, The Undersigned, Declare That: We Have Examined And Have No Reservation On The Bidding Documents Including Addenda, For The Contract Completion Of Concrete Perimeter Fence At Evacuation Center, At Brgy. Poblacion, Carmen, Surigao Del Sur. A) We Offer To Execute The Works For This Contract In Accordance With The Bid, And Bid Data Sheet, General And Special Conditions Of Contract Accompanying This Bid The Total Price Of Our Bid, Excluding Any Discounts Offered In Item (d) Below Is: _______________ The Discounts Offered And The Methodology For Their Application Are: _______________ B) Our Bid Shall Be Valid For A Period Of [insert Number] Days From The Date Fixed For The Bid Submission Deadline In Accordance With The Bidding Documents, And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period; C) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of __________ Percent Of The Contract Price For The Due Performance Of The Contract; D) Our Firm, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Have Nationalities From The Following Eligible Countries: Philippines E) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; F) Our Firm, Its Affiliates Or Subsidiaries, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Has Not Been Declared Ineligible By The Funding Source; G) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And H) We Understand That You Are Not Bound To Accept The Lowest Evaluated Bid Or Any Other Bid That You May Receive. Name: ___________________ In The Capacity Of: _______________ Signed: _______________ Duly Authorized To Sign The Bid For And On Behalf Of: ___________________ Date: ______________________ (with Bank’s Letter Head) Form Of Bid Security (bank Guarantee) Whereas, [insert Name Of Bidder] (hereinafter Called The “bidder”) Has Submitted His Bid Dated [insert Date] For The [insert Name Of Contract] (hereinafter Called The “bid”). Know All Men By These Presents That We [insert Name Of Bank] Of [insert Name Of Country] Having Our Registered Office At [insert Address] (hereinafter Called The “bank” Are Bound Unto [insert Name Of Procuring Entity] (hereinafter Called The “entity”) In The Sum Of [insert Amount] For Which Payment Well And Truly To Be Made To The Said Entity The Bank Binds Himself, His Successors And Assigns By These Presents. Sealed With The Common Seal Of The Said Bank This _____ Day Of _________ 20___. The Conditions Of This Obligation Are: 1. If The Bidder: (a) Withdraws His Bid During The Period Of Bid Validity Specified In The Form Of Bid; Or (b) Does Not Accept The Correction Of Arithmetical Errors Of His Bid Price In Accordance With The Instructions To Bidder; Or 2. If The Bidder Having Been Notified Of The Acceptance Of His Bid By The Employer During The Period Of Bid Validity: (a) Fails Or Refuses To Execute The Form Of Agreement In Accordance With The Instructions To Bidders, If Required; Or (b) Fails Or Refuses To Furnish The Performance Security In Accordance With The Instructions To Bidders. We Undertake To Pay To The Entity Up To The Above Amount Upon Receipt Of His First Written Demand, Without The Entity Having To Substantiate His Demand, Provided That In His Demand The Entity Will Note That The Amount Claimed By Him Is Due To Him Owing To The Occurrence Of One Or Both Of The Two (2) Conditions, Specifying The Occurred Condition Or Conditions. The Guarantee Will Remain In Force Up To And Including The Date 120 Days After The Deadline For Submission Of Bids As Such Deadline Is Stated In The Instructions To Bidders Or As It May Be Extended By The Entity, Notice Of Which Extension(s) To The Bank Is Hereby Waived. Any Demand In Respect Of This Guarantee Should Reach The Bank Not Later Than The Above Date. Date Signature Of The Bank Witness Seal (signature, Name And Address) Qualification Information Notes: The Information To Be Filled In By Bidders In The Following Pages Will Be Used For Purposes Of Qualification As Provided For In Part I, Part I. Section Ii. Eligibility Documents. This Information Will Not Be Incorporated In The Contract. Attach Additional Pages As Necessary. 1. Individual Bidders Or Individual Members Of Joint Ventures 1.1 Constitution Or Legal Status Of Bidder: [attach Copy] Place Of Registration: [insert] Principal Place Of Business: [insert] Power Of Attorney Of Signatory Of Bid: [attach] 1.2* Total Annual Volume Of Construction Work Performed In The Past Five Years As Listed In The Eligibility Data Sheet, Reflected Using The Currency Specified For The Bid. Annual Turnover Data (construction Only) Year Turnover In (specified Currency) 1. 2. 3. 4. 5. 1.3 Work Performed As Prime Contractor On Works Of A Similar Nature And Volume Over The Last Ten Years. Proof Of Completion, E.g. Certificate Of Completion Signed By The Employer Or Owner, Shall Be Submitted. Also List Details Of Work Under Way Or Committed, Including Expected Completion Date. Project Name And Country Name Of Employer And Contact Person Type Of Work Performed And Year Of Completion Total Value Of Contract (in Specified Currency) 1. 2. 1.4 Major Items Of Contractor’s Equipment Proposed For Carrying Out The Works. List All Information Requested Below. Item Of Equipment Description, Make, And Age (years) Owned, Leased (from Whom?), Or To Be Purchased (from Whom?) 1. [employer To Specify] 2. 3. 1.5* Qualifications And Experience Of Contract Manager Proposed For Administration And Execution Of The Contract. Attach Bio-data. Name (primary Candidate And Alternate) Years Of Experience In Similar Works Years Of Experience As Contract Manager 1. 2. 1.6* Financial Statements For The Last Five (5) Years. Attach Audited Financial Statements. 1.7 Evidence Of Access To Financial Resources To Meet The Qualification Requirements: Cash In Hand, Lines Of Credit, Etc. List Below And Attaché Copies Of Support Documents. Source Of Financing Amount In (specified Currency) 1. 2. 3. 1.8 Name, Address, And Telephone And Facsimile Numbers Of Banks That May Provide References If Contacted By The Entity. 1.9 Proposed Program Of Work (work Method And Schedule). Attach Descriptions, Drawings And Charts, As Necessary, To Comply With The Requirements Of The Bidding Documents. 1.10* Proposed Subcontracts And Firms Involved. Refer To Gcc Clause 8. Section Of The Works Value Of Subcontract Subcontractor (name And Address) Experience In Similar Work 2. Joint Ventures* 2.1 The Information Listed In 1.1 - 1.9 Above Shall Be Provided For Each Partner Of The Joint Venture. 2.2 Attach The Power Of Attorney Of The Signatory(ies) Of The Bid Authorizing Signature Of The Bid On Behalf Of The Joint Venture. 2.3 Attach The Agreement Among All Partners Of The Joint Venture (and Which Is Legally Binding On All Partners), Which Shows That: (a) All Partners Shall Be Jointly And Severally Liable For The Execution Of The Contract In Accordance With The Contract Terms; (b) One Of The Partners Will Be Nominated As Being In Charge, Authorized To Incur Liabilities, And Receive Instructions For And On Behalf Of Any And All Partners Of The Joint Venture; And (c) The Execution Of The Entire Contract, Including Payment, Shall Be Done Exclusively With The Partner In Charge. Letter Of Acceptance [letterhead Of The Entity] Date: [insert Date] To: [name And Address Of Contractor] This Is To Notify You That Your Bid Dated [insert Date] For Execution Of The [insert Name Of Contract And Identification Number As Given In The Itb] For The Contract Price Of [insert Amount In Specified Currency] , As Corrected And Or Modified If Applicable, In Accordance With The Instructions To Bidders Is Hereby Accepted By Our Agency. You Are Hereby Instructed To Come To Our Office Located At [insert Address] To Sign The Formal Agreement On [date] At [time]. Authorized Signature: Name: Designation: Form Of Contract Agreement This Agreement, Made This ____th Day Of _______ Between Hon. Jane V. Plaza, Municipal Mayor Of Carmen, Surigao Del Sur (hereinafter Called The“entity”) And ________________________________________, Represented By _________________________ (hereinafter Called The “contractor”). Whereas, The Entity Is Desirous That The Contractor Execute The Completion Of Concrete Perimeter Fence At Evacuation Center, Brgy. Poblacion, Carmen, Surigao Del Sur (hereinafter Called “the Works”) And The Entity Has Accepted The Bid In The Amount Of ___________________________________ (php . __________) By The Contractor For The Execution And Completion Of Such Works And The Remedying Of Any Defects Therein. Section Scope Of Works Unit Qty Unit Price Total Amount Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents Shall Be Attached, Deemed To Form, And Be Read And Construed As Part Of This Agreement, To Wit: (a) General And Special Conditions Of Contract; (b) Drawings/plans; (c) Specifications; (d) Invitation To Apply For Eligibility And To Bid; (e) Instructions To Bidders; (f) Bid Data Sheet; (g) Addenda And/or Supplemental/bid Bulletins, If Any; (h) Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes; (i) Eligibility Requirements, Documents And/or Statements; (j) Performance Security; (k) Credit Line Issued By A Licensed Bank, If Any; (l) Notice Of Award Of Contract And The Bidder’s Conforme Thereto; (m) Other Contract Documents That May Be Required By Existing Laws And/or The Entity. I. Environmental Management Plan (emp) Ii. Environmental Compliance Certificate (ecc),if Any 3. In Consideration Of The Payments To Be Made By The Entity To The Contractor As Hereinafter Mentioned, The Contractor Hereby Covenants With The Entity To Execute And Complete The Works Within 30 Calendars Days Inclusive Of 20 Days Allowance For Unworkable Conditions And Remedy Any Defects Therein In Conformity With The Provisions Of This Contract In All Respects. 4. The Entity Hereby Covenants To Pay The Contractor In Consideration Of The Execution And Completion Of The Works And The Remedying Of Defects Wherein, The Contract Price Or Such Other Sum As May Become Payable Under The Provisions Of This Contract At The Times And In The Manner Prescribed By This Contract. In Witness Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Municipality Of Carmen By : Contractor By : Jane V. Plaza _____________________________ First Party Second Party Signed In The Presence Of : ____________________________ _____________________ Witness Witness Notarial Acknowledgment Republic Of The Philippines) Before Me, This ______ Day Of _________________, Personally Appeared: Name Ctc No. Date Of Issue Place Of Issue 1. Jane V. Plaza __________ _____________ Carmen, Sds. 2. ____________________ __________ ______________ _____________ All Known To Me To Be Same Persons Who Executed The Foregoing Agreement And Acknowledge That The Same Are Their Free Act And Voluntary Deed. This Instrument Consisting Of _____ Pages, Including This Page Whereon The Acknowledgment Is Written, Has Been Signed By The Parties And Their Witnesses On Each And Every Page Thereof, Sealed With Notarial Seal. Notary Public Doc. No.______; Page No.______; Book No.______; Series Of 2025 (with Bank’s Letter Head) Form Of Performance Security (bank Guarantee) To : [name Of Procuring Entity] [address Of Procuring Entity] Whereas, [name And Address Of Contractor] (hereinafter Called The “contractor”) Has Undertaken, In Pursuance Of Contract No. [insert Number] Dated [insert Date] To Execute [name Of Contract And Brief Description Of Works] (hereinafter Called The “contract”); And Whereas, It Has Been Stipulated By You In The Said Contract That The Contractor Shall Furnish You With A Bank Guarantee By A Recognized Bank For The Sum Specified Therein As Security For Compliance With His Obligations In Accordance With The Contract; And Whereas, We Have Agreed To Give The Contractor Such A Bank Guarantee; Now Therefore, We Hereby Affirm That We Are The Guarantor And Responsible To You, On Behalf Of The Contractor, Up To A Total Of [insert Amount Of Guarantee In Numbers And In Words] Such Sum Being Payable In The Types And Proportions Of Currencies In Which The Contract Price Is Payable, And We Undertake To Pay You, Upon Your First Written Demand And Without Cavil Or Argument, Any Sum Or Sums Within The Limits Of [amount Of Guarantee] As Aforesaid Without Your Needing To Prove Or To Show Grounds Or Reasons For Your Demand For The Sum Specified Therein. We Hereby Waive The Necessity Of Demand Of The Said Debt From The Contractor Before Presenting Us With The Demand. We Further Agree That No Change Or Addition To Or Other Modification Of The Terms Of The Contract Or Of The Works To Be Performed There Under Or Of Any Of The Contract Documents Which May Be Made Between You And The Contractor Shall In Any Way Release Us From Any Liability Under This Guarantee, And We Hereby Waive Notice Of Any Such Change, Addition, Or Modification. This Guarantee Shall Be Valid Until A Date Twenty Eight (28) Days From The Date Of Issue Of The Certificate Of Completion. Signature And Seal Of The Guarantor Name Of Bank Address Date (with Bank’s Letter Head) Bank Guarantee For Advance Payment To: [name And Address Of Procuring Entity] [name Of Contract] Gentlemen: In Accordance With The Provisions Of The Gcc Clause 32 Of The Above-mentioned Contract, [name And Address Of Contractor] (hereinafter Called “the Contractor”) Shall Deposit With [name Of Procuring Entity] A Bank Guarantee To Guarantee His Proper And Faithful Performance Under The Said Clause Of The Contract In An Amount Of [amount Of Guarantee] [amount In Words] We, The [bank Or Financial Institution], As Instructed By The Contractor, Agree Unconditionally And Irrevocably To Guarantee As Primary Obligator And Not As Surety Merely, The Payment To [name Of Procuring Entity] On His First Demand Without Whatsoever Right Of Objection On Our Part And Without His First Claim To The Contractor, In The Amount Not Exceeding [amount Of Guarantee] [amount In Words] We Further Agree That No Change Or Addition To Or Other Modification Of The Terms Of The Contract Or Of Works To Be Performed There Under Or Of Any Of The Contract Documents Which May Be Made Between [name Of Procuring Entity] And The Contractor, Shall In Any Way Release Us From Any Liability Under This Guarantee, And We Hereby Waive Notice Of Any Such Change, Addition, Or Modification. This Guarantee Shall Remain Valid And In Full Effect From The Date Of The Advance Payment Under The Contract Until [name Of Procuring Entity] Receives Full Repayment Of The Same Amount From The Contractor. Yours Truly, Signature And Seal: Name Of Bank/financial Institution: Address: Date: Affidavit Of Disclosure Of No Relationship [see Itb Clause 3.2 Of The Bidding Documents] I, [name Of The Affiant], [state Nationality], Of Legal Age, [state Status], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. I Am The Authorized Representative Of [insert Name Of Bidder] With Office Address At [insert Address] An Established And Reputable Constructor Of [insert Name And/or Description Of The Works] For The Bidding Of [insert Name Of The Project] By The [insert Name Of Procuring Entity] (hereinafter Referred To As The “procuring Entity”); 2. None Of The [officers / Directors / Controlling Stockholders / Members / Owners] Of The [name Of The Bidder] Are Related By Consanguinity Or Affinity Up To The Third Civil Degree To The Head Of The Procuring Entity Or Any Of The Procuring Entity’s Officers Or Employees Having Direct Access To Information That May Substantially Affect The Result Of The Bidding, Such As, But Not Limited To, The Members Of The Bids And Awards Committee (bac), The Members Of The Technical Working Group (twg), The Bac Secretariat, The Members Of The Project Management Office (pmo), And The Designers Of The Project. 3. I Am Making This Statement In Compliance With Section 47 Of The Implementing Rules And Regulations Part A Of Republic Act 9184, And In Accordance With The Requirements Of The Procuring Entity 4. I Understand And Accept That Any False Statement In This Respect Will Render [name Of The Bidder], And Its Authorized Officers Liable For Prosecution To The Full Extent Of The Law. In Witness Whereof, I Have Hereunto Set My Hand This _________________ Day Of __________________, 20__, In The City Of __________________, Philippines. ______________________ Affiant Subscribed And Sworn To Before Me This ___________________________ Day Of _____________________, Philippines. ______________________ Notary Public Doc. No. __________; Page No. __________; Book No. __________; Series Of 20____ Omnibus Sworn Statement (revised) [shall Be Submitted With The Bid] _________________________________________________________________________ Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. [insert Name Of Bidder Or Its Authorized Representative] [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Latest Rules On Notarial Practice] Checklist Republic Of The Philippines Province Of Surigao Del Sur Municipality Of Carmen Bids And Awards Committee Bid Opening Checklist Name Of Contractor : _______________________________________________________ Name Of Project : _______________________________________________________ Bid Amount : _______________________________________________________ 1. Eligibility Documents A) Class A Documents A.) Dti ____ B.) Mayor’s Permit ____ C.) Pcab License ____ D.) Tax Clearance ____ E.) Audited Financial Statement/bir Income Tax ____ F.) Certificate Of Philgeps Registration (platinum) ____ B) - Class B Documents A.) Minimum Experience To Be Eligible And Qualified - One Project Of 80% Value For The Last 5-years ____ Same Nature - Average 3-years Total Project > 100% ____ 2. Technical Proposal A) Bid Security ____ B) Construction Schedule And S-curve ____ C) Pert-cpm ____ D) Manpower Schedule ____ E) Construction Method ____ F) Organization Chart For The Contract To Be Bid ____ G) Duly Signed Contractor’s Certification Of Key Personnel For The Contract, With Key Personnel’s Affidavits Of Commitment To Work On The Contract With Complete Qualification And Experience Data ____ H) Duly Signed List Of Contractor’s Equipment Pledge For The Contract Supported With Proof Of Ownership. ____ I) Equipment Utilization Schedule ____ J) Affidavit Of Site Inspection ____ K) Prospective Bidder’s Computation For Its Net Financial Contracting Capacity (nfcc) ____ L) Construction Safety And Health Program ____ M) Statement Of Ongoing Government And Private Construction Contracts, Including Contracts Awarded But Not Yet Started ____ N.) Statement Of All Completed Government And Private Construction Contracts Which Are Similar In Nature ____ O.) Evidence Of Financial, Technical & Prod’n. Capabilities/list Of Completed Projects ____ P.) Omnibus Sworn Statements In Accordance With Section 25.3 Of The Ra 9184 ____ Q.) Statement Of The Bidders Slcc Similar To The Contract To Be Bid ____ 3. Financial Proposal A. Duly Signed Bid Price In Approved Bid Form ____ B. Duly Signed Bill Of Quantities ____ C. Duly Signed Detailed Estimate ____ D. Duly Signed Cash Flow By Quarter And Payment Schedule ____ Documents To Be Submitted A) One (1) – Original; B) Two(2) Copies – Xerox ____
Closing Date19 Feb 2025
Tender AmountPHP 4 Million (USD 69.1 K)
7281-7290 of 7296 archived Tenders