Survey Tenders

Survey Tenders

BIG St Dtebau GmbH Treuh Nderischer Sanierungstr Ger Der Gemeinde Tender

Civil And Construction...+1Others
Germany
Details: In the historic town centre of Wusterhausen/dosse, 1. the ancillary facilities including lighting on Kyritzer Strasse are to be renovated and 2. around 17 small-scale measures are to be implemented to improve barrier-free access. The number of possible measures was roughly recorded on the basis of a tour and outlined in Appendix 4 to the service description. This survey is not final and must be checked and specified as part of the planning. Therefore, both the number and the design of the measures can still change. All measures are located in the historic town centre of Wusterhausen/dosse. There are numerous individual monuments along Kyritzer Strasse and in the entire town centre. In addition, some of the small-scale measures are located in the "market" monument area. The aim of the planning is therefore to ensure that the design is compatible with the monument. For this reason, all planning and implementation steps must be closely coordinated with the lower monument authority. This particularly applies to the choice of materials, color scheme and structural details that could influence the appearance of the historic city center. Since the city center is located within an archaeological monument, the construction work must be accompanied by archaeological surveys. Planning services are being advertised in the scope of services for traffic systems in accordance with §§ 45 - 48 Hoai in conjunction with Appendix 13 Hoai. The task includes all basic services of service phases 1 - 9 of the Hoai in the scope of services for traffic systems in accordance with §§ 47 ff Hoai in conjunction with Appendix 13 Hoai. Special service: On-site construction monitoring. The provisionally chargeable costs are estimated at 124,000 euros net.
Closing Date17 Jan 2025
Tender AmountRefer Documents 

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION USA Tender

Civil And Construction...+1Civil Works Others
United States
Details: Modification #1 the Purpose Of This Modification Is Add The Complete Solicitation With The Clauses. Reference Attached File "1a 1305m325q0041 Prism With Clauses." ****** construction Project – Parking Lot Sealcoat Treatment And Striping In Accordance With The Statement Of Work. total Small Business Set-aside Per Far Part 13 Under The Simplified Acquisition Threshold (sat). Firm Fixed-price Contract Will Be Awarded Per The Trade-off Criteria In Car 1352.213-70. See The Attached Full Sf 18 Construction Clauses And Provisions With All Terms And Conditions Which All Vendors Must Be In Compliance With To Be Eligible For Award. New Contract, No Incumbent. bonding/loc Will Be Required Unless Your Quote Is Under $35k. period Of Performance work Completed No Later Than 240 Days Of Award, Quotes Must Provide Confirmation They Can Fulfill This Requirement. place Of Performance: pocatello, Id - 1945 Beechcraft Ave. Pocatello, Id 83204 las Vegas, Nv - 7851 Dean Martin Dr. Las Vegas, Nv 89139 the General Decision (gd) Id20240091, Posted On 02/16/2024 And Nv20240058, Posted On 09/20/2024 Will Be Incorporated And May Be Viewed At Www.sam.gov see The Attached Sf 18 Construction Template With All Terms And Conditions Which All Vendors Must Be In Compliance With To Be Eligible For Award. the Government Does Not Accept Responsibility For Non-receipt Of Quotes. It Is The Contractor’s Responsibility To Request And Receive A Confirmation Of The Quote Receipt. construction Purchase Order Clauses (fixed-price) updated Through Fac 2025-02 (jan 2025) far 36.204 Disclosure Of The Magnitude Of Construction Projects the Magnitude Is Between $25,000 And $100,000. utilization Of Fedconnect® For Contract Administration the Department Of Commerce Will Utilize The Fedconnect® Web Portal In Administering This Award. The Contractor Must Be Registered In Fedconnect® And Have Access To The Fedconnect® Website Located At Https://www.fedconnect.net/fedconnect/. For Assistance In Registering Or For Other Fedconnect® Questions Please Call The Fedconnect® Help Desk At (800) 899-6665 Or Email At Support@fedconnect.net. There Is No Charge For Registration In Or Use Of Fedconnect®. (end) car 1352.215-72 Inquiries (apr 2010) offerors Must Submit All Questions Concerning This Solicitation In Writing Via Email To Marilyn.herrera@noaa.gov. Questions Should Be Received No Later Than 4:00 P.m. On 01/17/2025. Any Responses To Questions Will Be Made In Writing, Without Identification Of The Questioner, And Will Be Included In An Amendment To The Solicitation. Even If Provided In Other Form, Only The Question Responses Included In The Amendment To The Solicitation Will Govern Performance Of The Contract. (end Of Clause) far 52.236-27 Site Visit (construction) (feb 1995) (a) The Clauses At 52.236-2, Differing Site Conditions, And 52.236-3, Site Investigations And Conditions Affecting The Work, Will Be Included In Any Contract Awarded As A Result Of This Solicitation. Accordingly, Offerors Or Quoters Are Urged And Expected To Inspect The Site Where The Work Will Be Performed. (b) Site Visits May Be Arranged During Normal Duty Hours By Contacting: name: Mike Kent email: Mike.kent@noaa.gov phone: 805-889-0645 (end Of Provision) a Site Visit Is Highly Recommended But Not Required. Vendors Are Urged And Expected To Inspect The Site Where Services Are To Be Performed And To Satisfy Themselves Regarding All General And Local Conditions That May Affect The Cost Of Contract Performance, To The Extent That The Information Is Reasonably Obtainable. In No Event Shall Failure To Inspect The Site Constitute Grounds For A Claim After Contract Award. car 1352.213-70 Evaluation Utilizing Simplified Acquisition Procedures (apr 2010) the Government Intends To Award A Trade-off, Firm Fixed Price Purchase Order Resulting From This Request For Quotation To The Responsible Offeror Whose Quotation Results In The Best Value To The Government, Considering Both Price And Non-price Factors With Payment Terms Of Net 30. the Evaluation Will Consider The Non-price Technical Solution (technical Approach, Capability, Experience And Past Performance) To Be Significantly More Important Than Price. However, As Quotes Are Determined To Be More Equal In The Non-price Evaluation Factors, Price Becomes More Important. the Government Reserves The Right Not To Award A Purchase Order Depending On The Quality Of The Quote(s) Submitted And The Availability Of Funds. the Government May Award To Other Than The Lowest-priced Vendor Or The Vendor With The Highest Technical Rating If The Contracting Officer Determines That To Do So Would Result In The Best Value To The Government. The Government Will Not Make An Award At A Significantly Higher Overall Price To Achieve Only Slightly Superior Performance Capability. the Following Factors Are Listed In Order Of Importance And Will Be Used To Evaluate Quotations: technical Approach And Capability. the Offeror’s Overall Technical Approach Will Be Evaluated To Assess The Government's Level Of Confidence In The Offeror’s Understanding Of, Approach To, And Ability To Successfully Perform The Requirements As Described In The Statement Of Work. A Detailed Technical Approach Write-up Describing How The Offeror Will Perform This Service Is Required To Be Submitted With The Quote Regardless Of Whether A Site Visit Was Made Or Not. The Technical Approach Write-up Must Not Be A Reiteration Of The Statement Of Work, But How Your Company Plans On Performing The Tasks Listed In The Attached Statement Of Work. (i.e. Performance Checklists, Anticipated Number Of Employees, Anticipated Hours At The Facility And/or Confirmation Of Supplies Being Provided, Etc.) experience. the Offeror's Background, Experience, And Qualifications (relevant Past Projects Performing Similar Services, Certifications Related To Current Requirement, Etc.) Will Be Assessed To Determine The Likelihood That The Offeror Can Successfully Perform The Contract Requirements. Offeror Must Have Knowledge And Experience With Parking Lot Sealcoat Treatment And Striping. past Performance. quote Shall Include At Least Two References From At Least Two Separate Contracts For Similar And Relevant Services Including The Name, Phone Number, Full Address, And E-mail Address Of The Reference To Demonstrate The Offeror’s Capability To Successfully Perform The Services Listed In The Statement Of Work. the Offeror Is Required To Fill Out Blocks 1-4 And Send The Attached Past Performance Questionnaire To The References Provided By The Offeror In Their Submission, And Email The Completed Survey Form Directly To (cs/co Email) By The Closing Date And Time Of This Solicitation. The Government Reserves The Right To Consider Past Performance Report Forms Received After The Due Date And Time Of The Solicitation, Past Performance Questionnaires Submitted From Previous Solicitations, And To Contact References For Verification Or Additional Information. the Offeror's Past Performance On Related Contracts Will Be Evaluated To Determine, As Appropriate, Successful Performance Of Contract Requirements, Quality And Timeliness Of Delivery Of Goods And Services, Cost Management, Communications Between Contracting Parties, Proactive Management And Customer Satisfaction. The Government Will Use Its Discretion To Determine The Sources Of Past Performance Information Used In The Evaluation, And The Information May Be Obtained From References Provided By The Offeror, The Agency’s Knowledge Of Offeror Performance, Other Government Agencies Or Commercial Entities, Or Past Performance Databases, And Will Be Based On Responsiveness, Quality, And Customer Services. offerors Lacking Relevant Past Performance History, Or For Whom Past Performance Information Is Either Not Available Or Has Not Been Submitted To The Government, Will Receive A Neutral Rating For Past Performance. price. the Quoted Prices Will Be Evaluated But Not Scored. The Government Will Evaluate The Price Quote For Completeness And Reasonableness In Relation To The Rfq Requirements. Quoted Prices Must Be Entirely Compatible With The Non-price Technical Solution. period Of Performance: Work Completed No Later Than 240 Days Of Award, Quotes Must Provide Confirmation They Can Fulfill This Requirement. warranty In Writing For Parts And Labor. (end Of Provision) car 1352.213-71 Instructions For Submitting Quotations Under The Simplified Acquisition Threshold—non-commercial (apr 2010) (a) North American Industry Classification System (naics) Code And Small Business Size Standard. The Naics Code And Small Business Size Standard For This Acquisition Is 238990 And $19.0m. (b) Submission Of Quotations. Submit Quotations To The Office Specified In This Solicitation At Or Before The Exact Time Specified In This Solicitation. At A Minimum, Quotations Must Show– (1) The Solicitation Number; (2) The Name, Address, And Telephone Number Of The Offeror; (3) Acknowledgment Of Solicitation Amendments; (4) A Technical Description Showing That The Offeror Can Supply The Requirements In The Specifications Or Statement Of Work In Sufficient Detail To Allow The Government To Evaluate The Quotation In Accordance With The Evaluation Factors Stated In The Solicitation. (5) Past Performance Information, When Included As An Evaluation Factor, To Include Recent And Relevant Contracts For The Same Or Similar Items And Reference Information (including Contract Numbers, Points Of Contact With Telephone Numbers And Other Relevant Information). (6) Price And Any Supporting Details For The Price, As Requested In The Solicitation. (c) Offerors Are Responsible For Submitting Quotations And Any Modifications Thereto, So As To Reach The Government Office Designated In The Solicitation By The Time Specified. The Offeror's Initial Quotation Should Contain The Offeror's Best Terms From A Price And Technical Standpoint. The Government May Reject Any Or All Quotations If Such Action Is In The Public Interest; Accept Other Than The Lowest Quotation; And Waive Informalities And Minor Irregularities In Quotations Received. (end Of Provision) statement Of Work parking Lot Sealcoat Treatment And Striping background: the National Weather Service (nws), Weather Forecast Office (wfo’s) In Pocatello, Id And Las Vegas, Nv Have Parking Lots That Have Not Been Resealed In 10-15 Years And Are In Severe Need Of Treatment. The Existing Surface Has Deteriorated With Large Cracks. general Intention: to Obtain The Services Of Crack Repair, Seal Coat And Re-striping Parking Stalls To Include One Handicap Stall With Handicap Symbol. general Requirements: the Contractor Shall Provide All Supervision, Labor, Tools, Materials And Equipment Necessary To Perform Work As Stated. All Work And Materials Supplied Shall Be In Accordance With These Instructions, Manufacturer’s Specification, All Applicable Federal, State, Local, Osha, Epa, Nec, Nfpa, Building And Facilities Codes And Criteria. the Contractor Shall: 3.1. Provide, As Necessary, Sufficient Traffic Barricades While The Work Is In Progress To Restrict Access To The Work Area Until The Sealer Application And Re-striping Work Is Completed. Remove The Barricades Only After Notifying The Contracting Officer’s Representative (cor) That The Work Is Complete And Vehicle Access Is Authorized. 3.2. Contractor Shall Verify All Measurements Stated Below For Wfo Specifications. Total Asphalt Area For Each Site Is Listed Below. pocatello, Id - 14,350 Ft2 las Vegas, Nv - 14,500 Ft2 3.3. The Material Used Is Within Its Manufacturer Stated Shelf Life; Proof Of Shelf Life Shall Be Provided To The Cor. 3.4. Prior To Surface Cleaning, Clean Out All Cracks Using Compressed Air, And Seal All Cracks Between 1/8” To 2” In The Pavement Using An Approved Crack Sealant. The Crack Sealant Shall Be Compatible With The Surface Sealer Being Applied To The Asphalt Paved Areas Of This Project. 3.5. Repair Cracks That Are Larger Than 2” In Width By Saw Cutting. Remove 6” Of Old Material On Each Side Of The Crack (1 Foot In Total). Pack Removed Area With New Asphalt. 3.6. Before Applying The Sealer, All Foreign Material Shall Be Removed From The Surfaces To Be Treated Including Stall Striping Tape, Loose Material, Dirt, Clay, Oil And Grease Spots. Oil And Grease Spots Shall Be Cleaned And Spot Primed. After The Cleaning Operation And Prior To Application Of The Sealer, The Contractor Will Inspect The Area To Be Treated To Determine Its Ability To Receive The Sealer. 3.7. The Asphalt Sealer Shall Be Of A Type That Has Been Used Commercially In The Specified Areas For At Least The Past Three Years. The Sealer Shall Also Have A Proven Record Of Satisfactory Performance Based On The Ability Of The Material To Reduce The Rate Of Loss Of Fines And To Retard Crack Propagation Of The Pavement. 3.8. All Pavement Markings Which Existed Prior To The Application Of The Surface Sealer Shall Be Reestablished By The Contractor After The Manufacturer-recommended Curing Period. All Guidelines And Templates Shall Be Furnished By The Contractor. Finished Edges Of All Markings Shall Be Sharply Outlined. Paint Colors Shall Be Those As Specified By The American Association Of State Highway And Transportation Officials (aashto) For The Intended Use. attachments pocatello Wfo Drawing las Vegas Wfo Drawing submittal Requirements: the Contractor Shall Provide Electronic Copy Of Each Required Submittal In Accordance With The Below Schedule: deliverable objective due deliver To specification Sheets Describing In Detail The Marking Paint To Be Used For All Sites determine Material To Be Used within 10 Days Of Awarded Contract cor specification Sheets Describing In Detail The Crack Sealing Material To Be Used For All Sites determine Material To Be Used within 10 Days Of Awarded Contract cor specification Sheets Describing In Detail The Surface Sealing Material To Be Used For All Sites determine Material To Be Used within 10 Days Of Awarded Contract cor work Schedule, With Start And Completion Dates coordinate Scheduling With Nws within 3 Days Of Awarded Contract, Or Before Work Begins cor designation Of On-site, Job-site Supervisor And Contact Information provide A Primary Point Of Contact (poc) To Nws contract Award cor 1-year Warranty Documentation warranty Parts And Labor upon Acceptance Of Work contracting Officer (co) sds (safety Data Sheet) list Any Hazardous Material That Will Be Used In Performance Of This Contract. Ref. Far 52.223-3 And Fed-std-313e within 3 Days Of Awarded Contract, Or Before Work Begins, Whichever Occurs First co/cor location: project Is To Be Completed On The Below Premises. pocatello, Id - 1945 Beechcraft Ave. Pocatello, Id 83204 las Vegas, Nv - 7851 Dean Martin Dr. Las Vegas, Nv 89139 period Of Performance: work Must Begin Within Ten (10) Business Days Of Award Of The Purchase Order; “work” Includes Ordering Materials Not Already In Stock And Necessary To Perform The Work. On Site Work Shall Be Completed Within Two Hundred And Forty (240) Calendar Days Of Receipt Of All Necessary Materials. definitions: where “as Shown”, “as Indicated”, “as Detailed”, Or Words Of Similar Import Are Used, It Shall Be Understood That Reference To The Drawings Accompanying This Specification Is Made Unless Stated Otherwise. where “as Directed”, “as Required”, “as Permitted”, “approved”, “acceptance”, Or Words Of Similar Import Are Used, It Shall Be Understood That The Direction, Requirements, Permission, Approval, Or Acceptance Of The Co Is Intended Unless Stated Otherwise. as Used Herein, “provided” Shall Be Understood To Mean “provided Complete In Place”, That Is “furnished And Installed”. regular Working Hours: regular Working Hours Are From 0700 To 1600 Monday Through Friday Except Federal Holidays And Other Days Specifically Designated By The Designated Representative. “regular Working Hours” Means Hours A Contractor Can Expect To Be Allowed To Perform Work On Site, Or Be Able To Contact The Office. Anything Outside Regular Working Hours Must Be Done By Permission Of The Cor. observance Of Legal Holidays And Site Closure Information the Contractor Shall Observe Any Federal Holidays If The Holiday Falls Within The Period Of Performance Of This Contract. when Any Holiday Falls On A Saturday, The Preceding Friday Is Observed; When Any Holiday Falls On A Sunday, The Following Monday Is Observed. All Personnel Assigned To This Contract Shall Limit Their Observation Of Holidays To Those Set Forth Above. in Each Instance, The Contractor Agrees To Continue To Provide Sufficient Personnel To Perform Requirements Of Any Critical Tasks Already In Operation Or Scheduled, And Shall Be Guided By The Instructions Issued By The Cor. In The Event Of A Site Dismissal Or Closure Due To Weather, Emergency Or Other Circumstances, The Contractor Is Instructed To Contact The Cor. 2025 Holiday Schedule date holiday wednesday, January 01 new Year’s Day monday, January 20 birthday Of Martin Luther King, Jr. monday, January 20* inauguration Day monday, February 17** washington’s Birthday monday, May 26 memorial Day thursday, June 19 juneteenth National Independence Day friday, July 04 independence Day monday, September 01 labor Day monday, October 13 columbus Day tuesday, November 11 veterans Day thursday, November 27 thanksgiving Day thursday, December 25 christmas Day *this Holiday Is Designated As "inauguration Day" In Section 6103(c) Of Title 5 Of The United States Code, Which Is The Law That Specifies Holidays For Federal Employees. Federal Employees In The Washington, Dc, Area Are Entitled To A Holiday On The Day A President Is Inaugurated On January 20th For Each Fourth Year After 1965. **this Holiday Is Designated As "washington's Birthday" In Section 6103(a) Of Title 5 Of The United States Code, Which Is The Law That Specifies Holidays For Federal Employees. Though Other Institutions Such As State And Local Governments And Private Businesses May Use Other Names, It Is Our Policy To Always Refer To Holidays By The Names Designated In The Law. conduct Of Work the Contractor Must Ensure Employees Are Physically Able To Accomplish The Work Specified Herein. All Such Employees Working On Government Premises Are Subject To All Applicable Federal Rules And Regulations With Regard To Entering And Leaving The Premises And Building(s). Any Contractor Employee Who Is Considered Incompetent, Careless, Insubordinate, Unsuitable, Or Otherwise Objectionable Or Whose Continued Employment Is Contrary To The Public Interest By The Government’s Designated Representative Will Be Promptly Removed From The Contract Work Upon Notification To The Contractor By The Contracting Officer That Such Conditions(s) Described Above Exist. Onlylegal Us Citizens And Immigrants Are Allowed To Work On Federal Government Construction Projects. safety Requirements: all Work Shall Be Conducted In A Safe Manner And Shall Comply With Station Regulations And Department Of Labor Standards. The Government Will Not Provide Safety Equipment To The Contractor. The Contractor’s Work Site May Be Inspected During Performance Of The Contract For Osha And Station Safety Violations. It Will Be The Contractor’s Responsibility To Rectify Any Violations Immediately. the Contractor Shall Report Any Accidents That Occur During The Performance Of The Contract To The Co Or A Designated Representative, Within 24-hours Of An Occurrence. provide And Maintain Fire Extinguishers In Construction Areas. Flammable And Combustible Liquids: Store, Dispense And Use Liquids In Accordance With 29 Cfr 1926, Nfpa 241 And Nfpa 30. security Requirements: all Personnel Performing Work Under This Contract Shall Be Legal Citizens Or Legal Immigrants Of The United States. identification Of Contractor Vehicles: each Contractor Provided Vehicle Shall Show The Contractor’s Name That Is Clearly Visible And Let The Administrative Assistant At The Front Desk Know What Vehicle Belongs To You As The Contractor. Display A Valid State License Plate And Safety Inspection Sticker, If Applicable. Contractor Vehicles Operated On Government Property Shall Be Maintained In Good Repair. station Regulations: the Contractor And His Employees Shall Become Acquainted With And Obey All Government Regulations As Posted, Or As Requested By The Cor. government-furnished Equipment, Utilities, And Facilities: a Designated Representative Will, Upon Request, Designate Specific Areas Adjacent To The Building And Within The Existing Parking Lot, Specific Areas For The Delivery And Lay-down Of Materials And Equipment To Be Used By The Contractor Specific To This Work. Utilities, Such As Electricity Specific To This Work Will Be Supplied By The Government. cleanup: the Premises Shall Be Kept Free At All Times From Accumulation Of Waste And/or Rubbish Resulting From The Work. Upon Completion Of The Work, All Debris, Tools And Surplus Materials Shall Be Removed And The Entire Area Shall Be Left In A Neat And Clean Condition. All Debris, Trash, Waste And Surplus Material Shall Be Properly Disposed Of Off-site. points Of Contact: to Be Provided At Time Of Award. invoicing: upon Completion And Acceptance Of The Work, The Invoice Shall Be Submitted Via The Invoice Processing Platform (ipp). The Nws Designated Representative To Certify For Payment Is To Be Provided At Time Of Award. construction Order Certifications And Other Statements Of Offerors (fixed-price) ***note: Offeror Must Complete And Return This Section With Quote.*** order/contract Number: 1305m325q0041 name Of Offeror: ____________________________________ asbestos-containing Materials Certification the Offeror Hereby Certifies That No Asbestos-containing Materials, Products Or Supplies Will Be Delivered To The Work Site Or Utilized Or Installed During The Performance Of The Proposed Contract. The Offeror Also Certifies, That If Awarded The Contract, They Will Be Responsible For The Cost Of Removal Of All Asbestos-containing Materials, Products Or Supplies Delivered To The Work Site Or Utilized Or Installed During The Performance Of The Contract, And The Cost For Remediation Of Any Hazard Created. offeror Name: ________________________________________ certifying Official (vendor Signs) signature: printed Name: title: date: authorized Negotiator(s) the Offeror Or Respondent Represents That The Following Persons Are Authorized To Negotiate On Its Behalf With The Government In Connection With This Request For Offer: name title telephone Number
Closing Date21 Jan 2025
Tender AmountRefer Documents 

Bureau Of Corrections Muntinlupa City Metro Manila Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Philippine Bidding Documents Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (procurement/contract No. 009) Sixth Edition July 2020 Bids And Awards Committee 202 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 6 Section Iii. Bid Data Sheet 13 Section Iv. General Conditions Of Contract 19 Section V. Special Conditions Of Contract 24 Section Vi. Specifications 26 Section Vii. Drawings 59 Section Viii. Bill Of Quantities 60 Section Ix. Checklist Of Technical And Financial Documents 61 Section I. Invitation To Bid Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Invitation To Bid Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) 1. The Bureau Of Corrections, Through The National Expenditure Program (nep) Of 2025 Capital Outlay, Intends To Apply The Sum Of Three Hundred Million Pesos Only (₱300,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) With Identification Number _epa-009__. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bureau Of Corrections Now Invites Bids For Provision Of A Detailed Preliminary Architectural And Engineering Design, Detailed Engineering Requirements And Actual Construction Of The Bureau Of Corrections Super Maximum Security Facility, Based On The Final Detailed Architectural And Engineering Design, To Be Approved By The Head Of Procuring Entity Or Its Duly Authorized Representative Conformably With The Minimum Standards Set Forth In The (1) Presidential Decree (pd) No. 1096, National Building Code Of The Philippines (2) Batas Pambansa (bp)blg. 344, An Act To Enhance The Mobility Of Disabled Persons By Requiring Certain Public Buildings, Institutions, Establishments And Public Utilities To Install Facilities And Other Devices (3) National Structural Code Of The Philippines (nscp), Volume I, 2010 (4) Philippine Electrical Code (pec), 2009 (5) Revised Plumbing Code Of The Philippines (6) Revised Irr Of Ra 10575 (7) Republic Act (ra) No. 9514, Revised Fire Code Of The Philippines And (8) Applicable Local Regulations And Ordinances. Completion Of The Works Is Required Within Three Hundred Sixty-five (365) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project Amounting To At Least Fifty Percent (50%) Of The Abc Within The Last Six (6) Years. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act.” Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Cooperatives, And Partnerships Or Organizations With At Least Seventy-five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From Bureau Of Corrections And Inspect The Bidding Documents At The Address Given Below From Monday To Friday From 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On _december 28, 2024 (08:00am To 05:00pm) To January 20, 2025 (01:29 Pm)_____ From The Given Address And Website(s) Below. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity Bucor.gov.ph, Provided That Bidders Shall Pay The Applicable Fee Of Fifty Thousand (₱50,000.00) Pesos Only For The Bidding Documents Not Later Than The Submission Of Their Bids. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person Or By Facsimile. 6. The Bureau Of Corrections Will Hold A Pre-bid Conference On _january 06, 2025 (01:30pm)__ At Bac Conference Room Nbp Reservation Muntinlupa City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below, On Or Before __january 20, 2025 (01:30pm)_____. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 9. Bid Opening Shall Be On __january 20, 2025 (01:30pm)____ At The Bac Conference Room Nbp Reservation Muntinlupa City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Bureau Of Corrections Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Ma. Adoracion I. Viñas Office Of The Bac Secretariat Supply Office, Bureau Of Corrections, Muntinlupa City Tel # 02-8809-8587/02-8478-0907 Bacsec2022@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Bucor.gov.ph Date Of Issue: _______________ Ccsupt Celso S Bravo Chairperson, Bids And Awards Committee Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Bureau Of Corrections Invites Bids For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf), With Project Identification Number__________________. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 2025 In The Amount Of Three Hundred Million Pesos Only (₱300,000,000.00). 2.2. The Source Of Funding Is: Nga, The National Expenditure Program 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. [if Procuring Entity Has Determined That Subcontracting Is Allowed During The Bidding, State:] The Bidder Must Submit Together With Its Bid The Documentary Requirements Of The Subcontractor(s) Complying With The Eligibility Criteria Stated In Itb Clause 5 In Accordance With Section 23.4 Of The 2016 Revised Irr Of Ra No. 9184 Pursuant To Section 23.1 Thereof. 7.2. [if Subcontracting Is Allowed During The Contract Implementation Stage, State:] The Supplier May Identify Its Subcontractor During The Contract Implementation Stage. Subcontractors Identified During The Bidding May Be Changed During The Implementation Of This Contract. Subcontractors Must Submit The Documentary Requirements Under Section 23.1 Of The 2016 Revised Irr Of Ra No. 9184 And Comply With The Eligibility Criteria Specified In Itb Clause 5 To The Implementing Or End-user Unit. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address At Bac Conference Room Nbp Reservation Muntinlupa City And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty (120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Architectural, Engineering Design, Detailed Engineering Requirements And Construction Of Building With Concreting Works. 7.1 Subcontracting Is Not Allowed 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: For Design Personnel: Key Personnel General Experience Relevant Experience Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience. Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience. Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years’ Experience. Experience In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel: Key Personnel General Experience Relevant Experience Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience. Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. Foreman The Foreman Must Have At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Safety Officer The Sanitary Officer Must Have At Least Two (2) Years’ Experience. Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units Backhoe At Least 38hp With 0.055 To 0.160 M3 Bucket Capacity 1 Pay Loader At Least 2.5 To 9.5 M3 Bucket Capacity 1 Dump Truck At Least 10 Cu.m. 2 Generator 50kva 1 Concrete Mixers 1 Bagger 4 Welding Machines 300amp Heavy Duty 4 Submersible Dredging Pump At Least 1hp And 2” Output 1 Prospective Bidders Shall Attach The List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be. 12 No Further Instructions. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than 2% Of The Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less Than 5% Of The Abc, If Bid Security Is In Surety Bond. 19.2 No Further Instructions. 20 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its; 1. Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) 2. Supporting Documents For The Slcc (notice Of Award And/or Notice To Proceed And Project Owner’s Certificate Of Final Acceptance Issued By The Owner Other Than The Contractor Or The Constructors Performance Evaluation System (cpes) Final Rating, Which Must Be At Least Satisfactory. In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted) 3. Certified True Copy Coming From The Issuing Agency Of Valid And Current Registration Certificate (sec Certificate Of Registration For Corporation Or Dti Certificate Of Registration For Sole Proprietorship Or Cda Certificate Of Registration For Cooperative) 4. Valid And Current Mayor’s Or Business Permit 5. Valid And Current Tax Clearance 6. Valid And Current Pcab License And Registration 7. Audited Financial Statement 8. Three (3) Sets Photocopy Of Eligibility And Financial Envelope Duly Marked As “copy No.1”, “copy No.2” And “copy No.3” 21 No Further Instructions. Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property (ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Special Conditions Of Contract Gcc Clause 2 Sectional Completion Is Not Applicable The Intended Completion Date Is Three Hundred Sixty-five (365) Calendar Days From The Date Of Receipt Of The Ntp. 4.1 The Procuring Entity Shall Give Possession Of All Parts Of The Site To The Contractor From The Date Of The Receipt Of Notice To Proceed (ntp). 6 No Further Instructions. 7.2 Fifteen (15) Years. 10 No Dayworks Are Applicable To The Contract. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is One Tenth Of One Percent Of The Total Contract Price. 13 The Amount Of The Advance Payment Is Fifteen Percent (15%) Of The Contract Price Upon Submission To And Acceptance By The Bureau Of Corrections Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, A Bank Guarantee Or A Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission And Confirmed By The Bureau Of Corrections. 14 The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15.1 The Date By Which “as Built” Drawings Are Required Is Upon Actual Completion Of The Project. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Equivalent To Five Percent (5%) Of The Contract Price. Section Vi. Specifications Terms Of Reference Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Sablayan Prison And Penal Farm, Occidental Mindoro 1. Project Information 1.1 Project Description The Mission Of The Bucor Is To Protect Society By Confining Offenders In The Controlled Environments Of Prisons And Community-based Facilities That Are Safe, Humane, Cost-efficient, And Appropriately Secure, And That Provide Self-improvement Opportunities To Assist Offenders In Becoming Law-abiding Citizens. The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Shall Be Conducive To The Reformation And Rehabilitation Of Inmates That Will Bring Them Back Into The Mainstream Of Society As Useful Citizens Of The Country. The Contract Will Involve The Design And Build Scheme Leading To The Construction Of The Bureau Of Corrections Super Maximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm, Sablayan, Occidental Mindoro. The Plans And Designs Shall Be In Accordance With The Plan Of The Said Structures As Conceptualized By The Bucor Planning And Design Division Or As Conceptualized By The Winning Bidder If The Latter Is Found To Be Superior (as Defined In Section 3.1.1 Of This Tor). Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bureau Of Corrections Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Bucor Super Maximum Prison Facility (phase 2) Shall Be Constructed As Per Approved Drawings, Specifications, Bill Of Materials, Scope Of Works And The General Contract Conditions Following The Guidelines As Per Annex G Of Irr Of Ra 9184. This Project Aims To Be Completed Within A Year, Aligning With Our Decongestion Program. This Expedited Timeline Underscores Our Commitment To Addressing Urgent Needs Within The Correctional System And Providing Timely Solutions For The High Risk Committed Pdl. The Plans And Designs Shall Be In Accordance With The Plan Of The Said Structures As Conceptualized By The Planning And Design Division (pdd) Under. Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Construction Of Super Maximum-security Facility Shall Be Constructed As Per Approved Drawings, Specifications, Bill Of Materials, Scope Of Works And The General Contract Conditions Following The Guidelines As Per Annex G Of Irr Of Ra 9184. The Project Shall Have The Following Basic Components: A. Complete Detailed Architectural And Engineering Design Plans, Technical Specifications, And Design Calculations For The Construction Of The Project. Such Plans, Designs, And Technical Specifications Shall Be Subject For Review And Approval By The Bucor Pdd. The Design Development And The Contract Documents Phases Of The Design Shall Continue After The Bid Is Awarded. It Shall Likewise Be Subject For Review And Approval By The Director Of Directorate For Engineering Services (des). B. The Bid Shall Be Based On The Conceptual/schematic Design Drawings Prepared By The Bucor Pdd Or That Submitted By The Winning Bidder As Defined In Section 3.1.1 Of This Tor. C. The Contractor Shall Complete The Construction Of The Following Facility Component: I. One (1) Unit 2-storey“type B” Pdl Dormitory At Least 3190 Sq.m (gross Area) Polished Flooring And Sandwich Panel Roofing With The Capacity Of Atleast 340 Pdl, 2 Pdl Per Cell With Double Deck Bunk Bed (160 Cells), 1 Pdl Per Cell With Single Bed (20 Cells). The Dormitory To Include Complete Utilities, Power Supply, Cctv, Water Supply, Fire Protection; • Electrical System: Three-phase Power Line Supply, Connected From The Local Electric Utility (from Main Road/ Source To The Compound. The Power Line Shall Be Used For The Future Development Of The 50 Ha Facility. • Electrical System: Backup Power (three-phase Genset) Supply System With Capacity Not Less Than Total Computed Mva Load, Without Demand Factor (designed To Supply The Dormitory), And To Include Capacitor Bank, If Necessary; • Sewerage And Drainage Systems(pipelines To Cover From Project Site To Nearest Tapping Point); • Water Supply System With Sufficient Pressure To Provide The Water Requirement Of The Psdl. The System Is Oncomposed Of A Cistern Tank, Pumps, And An Overhead Water Storage Tank. Deep Well Source Water System (intake Box, Transmission Pipelines, Pressure Break Tanks, Chlorinator With Tanks And Accessories, Etc.) Whichever Is Deemed Most Suitable For The Facility And Is Authorized By The Lgu. • Fire Protection System (fire & Jockey Pump, Pump House), Fire Detection Alarm System And Fire Suppression Equipment Included In Dormitory. • Cctv Systems: To Install Cctv At Perimeter Fence To Monitor The Inside Compound And Dormitory To Monitor The Hallways And Blind Spots. Ii. 3 Meters Height Concrete Perimeter Security Fence With Concertina Above, To Cover 50 Hectares Area (plastered And Painted Finish); Iii. Primary And Secondary Fence For 1.8 Hectares Compound Including Gates, Catwalk And Post Towers (with Cr And Water Supply) (r.a. 10575 Rule 7). • 4 Meters Height Concrete Primary Perimeter Fence (with Catwalks, Concertina Wirings, Post Tower (with Cr And Water Supply) And Solar Lightings, (ra10575). • Secondary Perimeter Fence (3 Layer Concertina, Steel Mesh) With 300w Integrated Solar Light Every 3 Bays And (to Include Post Towers And Gates); Iv. Road Networks And Culverts • All Entry And Exit Point Of Any Bodies Of Water E.g. Creeks, Canals Shall Be Fenced Culvert By Metal Grills (non-corrosive); • The Project Has An Allocated Budget Sufficient To Cover At Least 1440 Sqm Of Road Construction Within The Prison Facility. While This Budget Allows For Road Development, Prioritization Shall Be Given To The Construction Of Culverts, Both Fenced And Road Culverts, To Ensure Adequate Drainage And Prevent Flooding. These Culverts Are Critical For The Road Leading From The Main Road To The Site, As Well As Along The Perimeter Of The Facility. To Accurately Assess The Project Scope And Design, Bidders Are Required To Conduct A Thorough Site Inspection To Identify And Evaluate All Necessary Culverts." 1.2 Contractual Framework The Contractual Arrangement To Be Used For The Project Is The Design-and-build (db) Scheme. Under This Scheme The Procuring Entity Awards A Single Contract For The Architectural/engineering Design And Construction To A Single Firm, Partnership, Corporation, Joint Venture Or Consortium. The Winning Contractor Shall Consult And Collaborate With The Bucor Pdd For The Preparation Of The Detailed Architectural Design Of The Project. The Detailed Architectural And Engineering Design Shall Be Subject For The Review And Approval By The Bucor Pdd. Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Obligations And Liabilities Of The Contractor And Its Architect Shall Be Joint And Solidary For Purposes Of The Detailed Architectural Design Of The Project In Accordance With Article 1723 Of The Civil Code Of The Philippines And Other Pertinent Laws. The Db Scheme Of Procurement Was Recommended, Endorsed, And Adopted Pursuant To The Annex G Of Irr Of Ra 9184. 2. Scope Of Contract 2.1 Obligations Of The Winning Bidder/contractor A. Render Architectural And Allied Engineering Design Services Including Final Schematic Design Necessary For The Implementation Of The Project. The Allied Engineering Design Services Shall Include, But Shall Not Be Limited To, Design For Architectural, Civil, Structural, Electrical, Mechanical, Plumbing, And Electromechanical. All Drawings Shall Be Generated Using Modern Modeling/drafting Software And Printed On High Quality 20” X 30” Blue Print Paper. B. Undertake Detailed Architectural And Engineering Designs (daeds) Using The Given Data Such As Topographic, Hydrographic And Cross–section Surveys, Geotechnical And Geological Investigation, And Hydrologic Investigation And Initial Schematic Design Or Design Concept Provided By The Bucor Pdd Which Conforms With The Minimum Performance Specifications And Standards (mpss); C. If Applicable, Secure Environmental Clearance Or An “environmental Compliance Certificate (ecc)”. If The Proposed Project Is Considered Outside The Purview Of The Philippine Environmental Impact Statement (eis) System, A Certificate Of Non- Coverage Or Certificate Of Exemption Shall Be Secured. D. The Project Shall Be Constructed According To The Daeds Prepared By The Winning Bidder And Approved By The Bucor And In Compliance With The Mpss As Well As Provided In Rule Vii, Section 7 Of The Irr Of Ra 10575. Likewise, Construction Includes Conformance To The Provisions Pertaining To Buildings Under The Latest Edition Of The Dpwh Standard Specifications For Public Works Structures, Volumes Ii And Iii (blue Book). The Blue Book Prescribes, Among Other Things, The Material Requirements And Construction Requirements For Different Items Of Work, Including The Tests To Be Conducted During Construction By The Dpwh-accredited Testing Laboratory. The Blue Book Incorporates Pertinent Provisions Of The American Society For Testing And Materials (astm) And American Concrete Institute (aci), Among Other Standards, Pertaining To Construction. Attention Shall Be Given To The Relevant Items Of Work In The Following Parts Of The Blue Book: Volume Ii ➢ Part A – Facilities For The Engineer ➢ Part B – Other General Requirements Volume Iii ➢ Part A – Earthwork ➢ Part B – Plain And Reinforced Concrete Works ➢ Part C – Finishing ➢ Part D – Electrical ➢ Part E – Mechanical ➢ Part I – Water Supply ➢ Part J – Flood Control And Drainage ➢ Part I-c – Drainage Works For Materials And Technologies Not Covered By The Blue Book, Or If The Proponent Intends To Use Any New Material/technology Which Is Not Accredited By The Dpwh Bureau Of Research And Standards (brs), The Proponent Shall Submit A Certification From A Recognized Foreign Or International Institution To The Effect That The New Materials Or Technology Meets The Mpss For This Project And Has Been Successfully Used In Existing Structures With Proven Integrity. The Winning Bidder Or Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Specified In Section 62.2 Of The Irr Of Ra 9184; And, F. The Winning Bidder Or Contractor Shall Be Solely Responsible For The Design And Shall Be Held Responsible For Any Default Resulted From Improper Design. Further, Extended Liability Of The Contractor Since It Stipulated That The Works, When Completed, Shall Be Fit For The Purpose For Which It Was Intended As Defined In The Contract. 2.2 Obligations Of The Bucor A. Provide Full Information On All Requirements For The Project; B. Approve The Winning Bidder Or Contractor’s Design Without Diminishing Their Full And Sole Responsibility For The Quality And Integrity Thereof; C. Give Prompt Written Notice Thereof To Winning Bidder Or Contractor, If It Observes Or Becomes Aware Of Any Defect In The Project; D. Designate, When Necessary, Representatives Authorized To Act On Its Behalf. It Shall Examine Documents Submitted By The Winning Bidder Or Contractor And Render Decisions Pertaining Thereto Promptly, To Avoid Unreasonable Delay In The Progress Of Their Work. It Shall Observe The Procedure Of Issuing Orders To The Winning Bidder Or Contractor; E. Supervise And Monitor The Implementation Of The Project; I. Construction Monitoring And Testing Forms: • The Use Of Construction Monitoring And Testing Forms That Will Be Provide By The Bucor - Nhq Pdd Is Mandatory Throughout The Duration Of Construction. • Oversight Of These Forms Will Be Conducted By The Engineering Services (es) Of The Sppf On Behalf Of The Bucor Pdd • Sppf-es To Impose To Contractor Testing Of All Items After Installation And/or Application. Es To Send Pdd Copy Of The Test Report/s. • Sppf-es To Monitor Material Delivery Of Contractor To Ensure All Materials Installed And/or Applied Are In Accordance With The Specifications Stated On Plans And Contract Of This Project. • In Case There Would Be Substitute Or Alternative To The Original Specification Of Material/s, Sppf- Es To Inform Pdd Of Such Variation. Ii. Bucor Engineer Visits: • Nhq Engineers And Architects (personnel Of Pdd) Will Conduct Site Visits On A Quarterly Basis Or Whenever Deemed Necessary To Ensure Compliance With Standards And Regulations. • Pdd Personnel To Witness The Final Testing And Commissioning Of The Systems, Equipment And Utilities Prior To Acceptance Of The Project Or Part Of The Project Thereof. Iii. Progress Billing Payment: • Sppf Es Engineers Will Provide Monthly Updates, Or As Deemed Necessary, On The Statement Of Work Accomplishment Based On The Actual Progress Of The Project, Including Reports Update. F. Pay The Accomplishment Accepted In The Conformance With The Mpss Included Under The Design And Build Contract. I. This Reports And Swa Updates Of The Ippf Es Will Be Reviewed And Approved By Pdd - Nhq Prior To Any Progress Billing Payments Being Made. 2.3 Bidding Documents The Bidding Documents For The Project Shall Govern The Conduct Of The Procurement Of The Project. 3. Scope Of Works 3.1 Planning And Design Phase 3.1.1 Preliminary Architectural Plan (pap) By Bidder The Approved Concept Design Shall Adopt The Provisions Indicated In Rule Vii, Section 7 Of The Irr Of Ra 10575. Bidders Shall Submit Also An Alternative Design Concept With Respect To The Actual Site Condition. This Alternative Design By The Winning Bidder Shall Be Adopted Should The Same Be Found To Be Superior Than The One Conceptualized By The Bucor Pdd. 3.1.2 Detailed Architectural And Engineering Design (daed) By The Winning Bidder During The Implementation Of The Project, The Winning Bidder Shall Prepare The Daed Of The Project And Submit The Same To The Bucor For Approval Prior To The Execution Of The Construction Works. The Winning Bidder Shall Prepare The Daed Based On Its Pap As Reviewed And Accepted By The Bucor Pdd And In Accordance With The Minimum Performance Standards And Specifications (mpss). The Daed Shall Be Undertaken With A Degree Of Accuracy That Will Allow Estimates To Be Made Within Approximately Plus Or Minus Five Percent (+/-5%) Of The Final Quantities. Once Approved By The Bucor, The Winning Bidder’s Daed Shall Form Part Of The Mpss. The Bucor-approved Daed, Together With The Mpss Provisions On Construction Under Section 2.0 Hereof, Shall Govern The Actual Construction Undertaken By The Winning Bidder. The Winning Bidder Shall Undertake The Necessary Field Surveys And Investigation In Accordance With The Dpwh Design Guidelines. In Carrying Out These Works, The Winning Bidder Shall Ensure That The Engineering, Environmental, Particularly During Field Investigations And The Development Of The Preliminary And Final Detailed Engineering Designs. The Winning Bidder Shall Ensure That All Designs Submitted For Approval Have Fully Taken Into Account Key Findings From The Engineering, Environmental, And That Negative Environmental Impacts Have Been Minimized Or Eliminated To The Fullest Extent Possible. 3.1.3 Architectural And Engineering Design Submittals I. Architectural Design A. The Building Should Be Designed With Structural, Electrical, Natural Or Combine Ventilation And Natural Lighting Following Building Design Standards. B. The Prospective Bidder Shall Prepare The Preliminary Architectural Plans In Accordance With The Requirements Of The National Building Code Of The Philippines, Accessibility Law (bp 344) Including All Other Applicable Laws And Local Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Site Development Plan 2. Vicinity Map 3. Perspective 4. Floor Plans 5. Elevations A. Front Elevation B. Rear Elevation C. Right Elevation D. Left Elevation 6. Sections A. Longitudinal Section B. Cross Section 7. Doors & Window Schedule 8. Plans And Details Of Stairs And Ramps 9. Schedule Of Finishes For Floors, Walls And Ceiling 10. Miscellaneous Details Ii. Structural Design A. The Proponent Shall Prepare The Necessary Structural Analysis/calculation And Design Of The Structural Members Of The Building Component In Accordance With The National Building Code Of The Philippines With Its Referral Codes Such As The Latest National Structural Code Of The Philippines. The Design For The Structure Shall Take Into Account, Among Other Things, The Seismic Requirements Of The Area To Determine The Optimum Safety Of The Whole Structure And To Minimize Possible Earthquake Damage. B. On The Basis Of The Data Obtained From The Detailed Site Investigations, Topographical/soil And Survey, Geotechnical Engineering, Foundation Investigation, Material Testing, Survey Of Existing Site Conditions, The Seismic Requirements Of The Area, The Load Requirements Of The Building And Other Investigation Required To Obtain The Data Necessary To Ensure The Safety Of The Structure, The Proposal Shall Prepare The Preliminary Structural Design Plans Of The Structure. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Structural Design Criteria And Design Notes 2. Foundation Plan 3. Floor Framing Plans 4. Schedule Of Slab, Beams And Girders 5. Schedule Of Columns 6. Schedule Of Footings 7. Structural Details Of Stairs/ramp, If Applicable 8. Roof Framing Plan, If Applicable 9. Schedule And Details Of Trusses, If Applicable 10. Road Design And Details (if Applicable) 11. Miscellaneous Details Iii. Sanitary/plumbing Design A. General • The Detailed Design Shall Conform To The General Standards Adopted By The Sanitary & Plumbing Code Of The Philippines And Other Pertinent Laws And Ordinances. • All Design Considerations/assumptions Shall Be Based On The Results Of The Technical Studies, Detailed Analyses, And Design Computations. • The Technical Drawings And Specifications Shall Clearly Indicate All The Details Required To Ascertain The Care And Thoroughness Devoted In The Preparation Of The Drawings. B. Drainage And Sewerage • The Drainage Layout Shall Show All The Required Information Such As Direction Of Flow, Manhole-to-manhole Distances, And Sizes Of Lines, Manholes/canals, Location Of Outfalls, Etc. • The Prospective Bidder Shall Prepare A Design For The Sewage Treatment Plant In Accordance To The Clean Water Act Of 2004 (republic Act No. 9275) And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Sewer, Vent And Storm Drainage Layout 4. Enlarged Toilet Plan For Common And Pwd Toilets 5. Isometric Diagram 6. Miscellaneous Details 7. Drainage And Sewerage System 8. Three Chamber Septic Tank Plans And Details C. Water Supply And Distribution System • The Proponent Shall Carry Out A Preliminary Detailed Design For The Water Supply Of The Project. The Design Should Be On The Basis Of The Source And Volume Of Water Supply, Water Consumption, Piping Network, And Conveyance In Accordance With The Applicable Laws, Rules And Regulations Governing Health, Safety And Sanitation. • The Contractor Shall Install Elevated Water Storage/s Per Unit Located At The Roof Deck Of The Prison Dormitories. (sufficient Capacity To Supply The Pdl) Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Water Line Layout 4. Water Line Isometric Diagram 5. Water Reservoir Plans And Details 6. Miscellaneous Details Iv. Electromechanical Design A. Sewage Treatment Plant • The Prospective Bidder Shall Prepare A Design For The Sewage Treatment Plant In Accordance To The Clean Water Act Of 2004 (republic Act No. 9275) And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Electrical System Layout 4. Mechanical System Layout 5. Instrumentation And Control System Diagrams 6. Piping And Instrumentation Diagrams (p&ids) 7. Equipment Details And Specifications 8. Electrical Power Distribution 9. Emergency Power Systems 10. Grounding And Lightning Protection 11. Control And Monitoring Systems, If Applicable 12. Safety Systems 13. Miscellaneous Details B. Fire Protection System • The Prospective Bidder Shall Prepare A Design For The Fire Protection System In Accordance To The Fire Code Of The Philippines, (irr) Of Ra 9514, And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Sprinkler System 2. Sprinkler System Isometric Diagram 3. Fire Fighting Piping System Diagram 4. Fire Alarm System Layout 5. Fire Suppression System Layout 6. Smoke Management System Layout 7. Fire Pump And Water Supply 8. Miscellaneous Details V. Electrical Design A. The Prospective Bidder Shall Prepare A Preliminary Design Plan For The Electrical And Power Supply System Of The Building In Accordance With The Electrical Code Of The Philippines, Fire Code Of The Philippines, National Building Code Of The Philippines And Other Relevant Laws And Ordinances. B. The Prospective Bidder Shall Prepare A Design For The Electrical And Power Supply System Considering Ease Of Maintenance And Prevention Of Illegal Connections Including Electrical Supply For Ceiling Fans. C. The Prospective Bidder Shall Prepare A Design For Backup Power Generator With Capacity Not Less Than Total Computed Kva Load Without Demand Factor. D. 3-phase Electrical Supply Shall Be Sourced From The Local Electrical Utility. E. Power Line Connection From Main Source To The Facility Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Power Riser Diagram 2. Power Layout System 3. Lighting Layout System 4. Local Area Network System, If Applicable 5. Grounding System 6. Load Schedules 7. Others As Applicable Vi. Other Requirements  Technical Specifications  Boring Test  Structural Design And Analysis And Computation  Final Design And Construction Plans  Upon Award Of Contract, The Contractor Shall Comply The Following: O Prepare Final Draft Of Architectural And Engineering Design Plans Incorporating All Design Refinements And Revisions Based On Project Requirement Or As May Be Required By The Bucor Pdd Within The Scope Of Design. O Submit To The Bucor Design And Build Committee (bucor-dbc) The Final Architectural And Engineering Design Plans And Specifications Duly Signed And Sealed By The Concerned Professional Architect, Engineers, Incorporating All The Necessary Revisions And Refinements For Approval By The Head Of Procuring Entity. 3.2 Construction Phase The Following Works Shall Comprise This Phase: I. Permits And Clearances, The Contractor Shall Upon Authorization Of The Head Of The Procuring Entity (hope), Make Representations With The Government Agencies Concerned To Expedite The Processing Of The Necessary Permits And Certificates Such As The Following: A. Zoning Certification And Locational Clearance B. Building /electrical/sanitary Permits C. Certificate Of Occupancy D. Environmental Clearance Certificate E. All Other Permits/clearances As May Be Required For The Construction. Ii. Mobilization, The Contractor Shall Mobilize All The Required Project Team Personnel, Equipment, Tools, And Manpower With The Required Skills And In Sufficient Number As May Be Necessary For His Efficient Undertaking Of The Project. Iii. Clearing, Grubbing And Hauling/disposal Of Debris Iv. Construction Stage As A Rule, Contract Implementation Guidelines For Procurement Of Infrastructure Projects Shall Comply With Annex “e” Of The Revised Irr Of Ra 9184. The Following Provisions Shall Supplement These Procedures: I. No Works Shall Commence Unless The Contractor Has Submitted The Prescribed Documentary Requirements And Implementing Unit Has Given Written Approval. Work Execution Shall Be In Accordance With Reviewed And Approved Documents. Ii. The Contractor Shall Be Responsible For Obtaining All Necessary Information As To Risks, Contingencies And Other Circumstances Which May Affect The Works And Shall Prepare And Submit All Necessary Documents Specified By The Implementing Unit To Meet All Regulatory Approvals As Specified In The Contract Documents. Iii. The Contractor Shall Submit A Detailed Program Of Works Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) For Approval By The Head Of The Procuring Entity (hope) That Shall Include, Among Others: A. The Order In Which It Tends To Carry Out The Work Including Anticipated Timing For Each Stage Or Design/detailed Engineering And Construction; B. Periods For Review Of Specific Outputs And Any Other Submissions And Approvals; C. Sequence Of Timing For Inspection And Tests; D. General Description Of The Design And Construction Methods To Be Adopted; E. Number Of Personnel To Be Assigned For Each Stage Of The Work; F. List Of Equipment Required On Site For Each Stage Of The Work; And G. Description Of The Quality Control System To Be Utilized For The Project. Iv. Any Errors, Omissions, Inconsistencies, Inadequate Or Failure Submitted By The Contractor That Do Not Comply With The Requirements Shall Be Rectified, Resubmitted And Reviewed At The Contractor’s Cost. If The Contractor Wishes To Modify Any Design Or Document Which Has Been Previously Submitted, Reviewed And Approved, The Contractor Shall Notify The Implementing Unit Within A Reasonable Period Of Time And Shall Shoulder The Cost Of Such Changes. V. As A Rule, Changes In Design And Construction Requirements Shall Be Limited Only To Those That Have Not Been Anticipated In The Contract Signing And Approval. The Following Guidelines Shall Govern Approval For Change Or Variation Order: A. Change Orders Resulting From Design Errors, Omissions Or Non-conformance With The Performance Specifications And Parameters And The Contract Documents By The Contractor Shall Be Implemented By The Contractor At No Additional Cost To The Bureau Of Corrections. B. Provided That The Contractor Suffers Delay And/or Incurs Costs Due To Changes Or Errors In The Preparation Of Performance Specification And Parameters, The Contractor Shall Be Entitled To Either One Of The Following:  An Extension Of Time For Any Such Delays Under Section 10 Of Annex “e” Of Irr-a (ra9184; Or  Payments For Such Cost As Specified In The Contract Documents, Provided That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. C. The Contract Documents Shall Include The Manner And Schedule Of Payment Specifying The Estimated Contract Amount And Installments In Which The Contract Will Be Paid. D. The Contractor Shall Be Entitled To Advance Payment Subject To The Provisions Of Section 4 Of Annex “e” Of The Revised Irr Of Ra 9184. E. The Implementing Unit Shall Monitor The Quality Control Procedures For The Design And Construction In Accordance With The Government Guidelines And Shall Issue The Proper Certificates Of Acceptance For Sections Of The Works Or Whole Of The Works As Provided For In The Contract Documents. F. The Contractor Shall Provide All Necessary Equipment, Personnel, Instruments, Documents And Others To Carry Out Specified Tests. G. This Design And Build Project Shall Have Minimum Defects Liability Period Of One (1) Year Contract Completion Or As Provided In The Contract Documents. This Is Without Prejudice To The Liabilities Imposed Upon The Engineer/architect Who Drew Up The Plans And Specification For A Building Sanctioned Under Section 1723 Of The New Civil Code Of The Philippines. H. The Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Of 15 Years For Permanent Structures/buildings And 5 Years For Roads As Specified In Section 62.2.2 Of The Revised Irr Of Ra 9184 V. As-built Plans. The Contractor Shall Cause The Preparation And Submission Of As-built Plans Duly Signed And Sealed By All Concerned Parties Involved In The Construction In The Same Sheet Size And Scale As The Original Drawings In One (1) Blue Print Copy And One (1) Reproducible Copy. Vi. General Requirements: 1. Temporary Facilities Such As Field Offices For The Bucor Inspectorate Team, Project Engineers And Quarters For Laborers; Temporary Warehouse For The Construction Material. 2. Office Furniture And Equipment, Survey Equipment And Consumables 3. Photographs: This Item Consists Of The Supply Of Equipment And Materials, I.e., Album, Necessary To Undertake Photographic Progress Activities Of The Project And Of All Cost Incidental To The Preparation And Submission Of Photographs (at Least 12 Photographs Per Day). The Quantities For Photographs Shall Be One (1) Set Of Photographs Per Month. 4. Health And Safety Program Including Personal Protective Equipment (ppe) A. All Standard Safety Measures And Precautions Shall Be Exercised By The Contractor In The Course Of The Project For The Protection Of The Public And Its Workers And In Conformity With Dole Department Order No. 13, Series Of 1998. B. All Workers Shall Be Equipped With Proper Working Uniform And Identification At All Times. They Must Be Registered With The Governing Bucor Security Office And Must Comply With The Bucor’s Rules And Regulations. C. The Contractor Shall Secure His/her Own Equipment And Materials On Site. The Bucor Shall Not Be Liable To Any Losses Incurred During The Progress Of The Work. 5. Minimum Heavy Equipment Requirement (as Needed) For Site Development Such As: No. Item Specification 1. Backhoe 0.8 Cu. M. 2. Backhoe Wheel Mounted With Breaker 0.90 Cu. M. 3. Cargo/service Truck 2-5 Mt., 160 Hp 4. Dump Truck 12 Cu. Yd. 5. Motorized Road Grader G710a, 140hp 6. Payloader 1.5 Cu. M. 7. Vibrator Roller 10 Mt 8. Bulldozer 170 Hp 9. Scraper 515 Hp 10. Truck Mounted Crane, Hydraulic Telescopic Bommer Capacity: 41 – 45 Mt. 11. Crawler Crane 41-45 Mt 12. Generator Set 300 Kw/375 Kva 13. Water Pump 100mm Suction Dia. 14. One Bagger Mixer 4-6 Ft3/min 15. Concrete Vibrator Ey20, 5hp, 32-70mm 16. Vibro Hammer 45000 Kg-m 17. Excavator 17.5 Kw Or Any Specify Types Of Heavy Equipment Needed For A Site Development Will Be Determined By The Winning Bidder. 6. Environmental Compliance 7. Communication Equipment: This Item Consists Of The Provision Of Communication Equipment. 8. Billboard 9. Traffic Management (if Applicable). Vii. Building Construction 1 Lot One (1) Unit 2-storey“type B” Pdl Dormitory At Least 3190 Sq.m (gross Area) Polished Flooring And Sandwich Panel Roofing With The Capacity Of Atleast 340 Pdl, 2 Pdl Per Cell With Double Deck Bunk Bed (160 Cells), 1 Pdl Per Cell With Single Bed (20 Cells). The Dormitory To Include Complete Utilities, Power Supply, Cctv, Water Supply, Fire Protection; • Electrical System: Three-phase Power Line Supply, Connected From The Local Electric Utility (from Main Road/ Source To The Compound. The Power Line Shall Be Used For The Future Development Of The 50 Ha Facility. • Electrical System: Backup Power (three-phase Genset) Supply System With Capacity Not Less Than Total Computed Mva Load, Without Demand Factor (designed To Supply The Dormitory), And To Include Capacitor Bank, If Necessary; • Sewerage And Drainage Systems(pipelines To Cover From Project Site To Nearest Tapping Point); • Water Supply System With Sufficient Pressure To Provide The Water Requirement Of The Psdl. The System Is Composed Of A Cistern Tank, Pumps, And An Overhead Water Storage Tank. Deep Well Source Water System (intake Box, Transmission Pipelines, Pressure Break Tanks, Chlorinator With Tanks And Accessories, Etc.) Whichever Is Deemed Most Suitable For The Facility And Is Authorized By The Lgu. • Fire Protection System (fire & Jockey Pump, Pump House), Fire Detection Alarm System And Fire Suppression Equipment Included In Dormitory. • Cctv Systems: To Install Cctv At Perimeter Fence To Monitor The Inside Compound And Dormitory To Monitor The Hallways And Blind Spots. 1 Lot 3 Meters Height Concrete Perimeter Security Fence With Concertina Above, To Cover 50 Hectares Area (plastered And Painted Finish); 1 Lot Primary And Secondary Fence For 1.8 Hectares Compound Including Gates, Catwalk And Post Towers (with Cr And Water Supply) (r.a. 10575 Rule 7). • 4 Meters Height Concrete Primary Perimeter Fence (with Catwalks, Concertina Wirings, Post Tower (with Cr And Water Supply) And Solar Lightings, (ra10575). • Secondary Perimeter Fence (3 Layer Concertina, Steel Mesh) With 300w Integrated Solar Light Every 3 Bays And (to Include Post Towers And Gates); 1 Lot Road Networks And Culverts • The Project Has An Allocated Budget Sufficient To Cover At Least 1440 Sqm Of Road Construction Within The Prison Facility. While This Budget Allows For Road Development, Prioritization Shall Be Given To The Construction Of Culverts, Both Fenced And Road Culverts, To Ensure Adequate Drainage And Prevent Flooding. These Culverts Are Critical For The Road Leading From The Main Road To The Site, As Well As Along The Perimeter Of The Facility. • All Entry And Exit Point Of Any Bodies Of Water E.g. Creeks, Canals Shall Be Fenced Culvert By Metal Grills (non-corrosive); • To Accurately Assess The Project Scope And Design, Bidders Are Required To Conduct A Thorough Site Inspection To Identify And Evaluate All Necessary Culverts. A. Material Specifications: A. Floor Finishes • Polished Cement Finish Prison Cell, Hallways, Staircases, And Rooms • Plain Cement Finished - Pathways. • Ramps - Anti Slip Pavers Or Tiles • Crs – Unglazed Ceramic Tiles B. Wall Finishes A. Glazed Wall Tiles - 1.8m Height. B. Plain Cement Plaster Finish - For All Buildings And Facilities C. Ceiling Finishes C. Concrete Steel Decking, If Applicable. – Coated In White Enamel D. Painting D. Semi-gloss Solvent Paint Top Coat (high-end Quality) For Interior And Exterior Walls In Two To Three Coats Application. Apply Concrete Neutralizer For Newly Finished Concrete Surfaces. Use Solvent Primer. E. Varnish Paint Finish With Weather Proof Coating – For Doors And Jambs Branded, High-end Quality (offices, Etc.), All Wooden Doors Must Have Secondary Steel Doors. F. Use Epoxy Paint Primer. Epoxy Paint Finish – For Structural Steel And All Metal Works E. Doors And Windows G. No Doors For Prison Facility Comfort Rooms With 1.20 Meter Finish Wall Height (see Rule Vii, Section 7 R-irr Of Ra 10575). H. Steel Doors And Grills – For Dormitories, Gates And Other Security Areas. Sliding Doors For All Cells (see Rule Vii, Section 7 R-irr Of Ra 10575) F. Waterproofing I. Uv Resistant Polyurethane Waterproofing – For All Roof Deck With Topping Works Provided With Welded Wire Mesh. (at Elevated Water Tank Area) J. Cistern - Polyurethane Waterproofing G. Plumbing Works K. Upvc Pipe Series 1000 – For All Soil, Sewer, Waste, Dry And Wet Vent Piping High-end Quality L. Pprc Fusion Type – For All Water Lines High-end Quality M. Contractor Encouraged To Adapt: Lpf Flush Valve For Water Closet Or Stainless Toilet-lavatory Combination. Waterless Urinals N. Sprinkler System To All Prison Dormitories In Accordance With The Provisions Of Revised Plumbing Code Of The Philippines. O. Contractor To Provide A Water System To Supply The Facility 4. Approved Budget For The Contract (abc) The Approved Budget For The Contract (abc) Is Php 300,000,000. This Is The Ceiling For Acceptable Bids. Bids Higher Than Abc Shall Be Automatically Rejected. 5. Proposed Implementation Schedule (example): No. Of Months 1 2 4 5 6 7 8 9 10 11 12 Design Phase Construction Phase 6. Eligibility Criteria For Bidders 6.1 General The Eligibility Requirements For This Design And Build Project Shall Adopt The Provisions Of Annex “g” Of The Implementing Rules And Regulations Of Ra 9184 (e.g. Eligibility Requirement). However, If A Bidder Who Has No Experience In Db Project On Its Own May Opt To Enter A Subcontracting Agreement, Partnership, Or Joint Venture With A Design Or Engineering Firm For The Design Portion Of The Project. 6.2 Legal Requirements A. Valid Contractor’s License Issued By The Philippine Contractor’s Accreditation Board B. Valid License Of The Contractor’s Designer Issued By The Professional Regulation Commission. 6.3 Technical Requirements A. The Contractor’s Designer Must Have Designed One Structure Similar To The Project At Hand With A Construction Cost Of At Least 50 % Of The Abc. 6.4 Financial Requirements The Contractor Must Have A Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc To Be Bid Or Equivalent To Php300,000,000.00. 7. Contents Of The Bid 7.1 In The First Envelope Class “a” Documents Legal Documents I. Philgeps Certificate Of Registration And Membership In Accordance With Section 8.5.2 Of This Irr. For Procurement To Be Performed Overseas, It Shall Be Subject To The Guidelines To Be Issued By The Gppb. (a) Ii. Pcab License And Registration, In Case Of Jv; 57 Iii. Statement Of All Ongoing Government And Private Contracts; Iv. Statement Of Slcc; V. Nfcc Computation; Vi. Jva, If Applicable; Vii. Bid Security In The Prescribed Form, Amount And Validity Period; Viii. Project Requirements, Which Shall Include The Following: 1. Organizational Chart For The Contract To Be Bid; 2. List Of Contractor’s Personnel (design And Construction), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; 3. List Of Contractor’s Equipment Units Which Are Owned, Leased And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From Lessor/vendor For The Duration Of The Project. Ix. Omnibus Sworn Statement By The Prospective Bidder Or Its Authorized Representative In The Prescribed Format; X. Submission Of Preliminary Conceptual Design Plans: Class “b” Documents I. For Infrastructure Projects, Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And It’s Irr. Ii. Each Partner Of The Joint Venture Shall Submit Their Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. 1. Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) A. Location Plan/vicinity Map B. Perspective C. Floor Plans D. Front View Elevation E. Rear View Elevation F. Left Side View Elevation G. Right Side View Elevation H. Longitudinal Section I. Transverse Section 2. Design And Construction Method 3. List Of Contractor’s Personnel To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc), Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; For Design The Key Professionals And The Respective Qualifications Of The Design Personnel Shall Be As Follows: • Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. • Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. • Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Ten (5) Years’ Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel The Key Professionals And The Respective Qualifications Of The Construction Personnel Shall Be As Follows: • Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. • Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. • Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. • Foreman The Foreman Must Have At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Safety Officer The Safety Officer Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) And Must Have At Least Two (2) Years’ Experience. 4. Value Engineering Analysis Of Design And Construction. The Second Envelope (financial Proposal) Shall Contain All The Required Documents For Infrastructure Projects Under Section 25.38 Of The Irr Of R.a 9184. 7.2 In The Second Envelope – Financial Proposal The Contents Of Financial Proposal – In The Second Envelope Shall Be Governed By Section 6.1 Design And Build Scheme Of The Dpwh Procurement Manual Volume Ii - Infrastructure Main Guidelines (2016). A. Lump Sum Bid Prices, Which Shall Include The Detailed Engineering Cost, In The Prescribed Bid Form Inclusive Of Vat B. Detailed Estimates Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals Used In Coming Up With The Bid For The Following: I Detailed Architectural And Engineering Design; Ii Demolition Works; And Iii Building Construction/civil Works. C. Bill Of Quantities D. Cash Flow And Payments Schedule. 8. Procedure And Criteria For Bids Evaluation For The Detailed Evaluation Of The Design And Build Proposals A Two-step Procedure Shall Be Adopted By The Bac, Which May Be Undertaken With The Assistance Of The Dbc. First-step Procedure: With The Assistance Of The Bucor Design And Build Committee (bucor-dbc), The Bac Shall Conduct The Opening, Preliminary Examination And Detailed Evaluation Of The Design And Build Proposals, As Follows: (1) The First Step Of The Evaluation Shall Involve The Review Of The Preliminary Conceptual Designs And Track Record Submitted By The Contract As Indicated In The Bidding Documents Using A Nondiscretionary “pass/fail” Criteria That Involve Compliance With The Following Requirements: A. Performance Specifications And Parameters And Degree Of Details; B. Adherence Of Preliminary Design Plans To The Required Concept Of Approach And Methodology For Detailed Engineering, Design And Construction With Emphasis On The Clarity, Feasibility, Innovativeness And Comprehensiveness Of The Plan Approach, And The Quality Of Interpretation Of Project Problems, Risks, And Suggested Solutions; And C. Quality Of Personnel To Be Assigned To The Project Which Covers Suitability Of Key Staff To Perform The Duties Of The Particular Assignments And General Qualifications And Competence Including Education And Training Of The Key Staff. 8.1 Merit Point Critera For The Bid Evaluation 8.1.1 Adherence To Performance Specifications (35 Points) A. Compliance And Adherence To Specifications: Excellent Compliance (100 Points): The Submission Fully Adheres To All Specified Project Requirements And Regulations, Demonstrating Meticulous Attention To Detail And Comprehensive Understanding Of The Tor. All Drawings And Documentation Are Accurate, Complete, And In Compliance With Relevant Standards. Good Compliance (80 Points): The Submission Largely Complies With Project Specifications And Regulations, With Minor Discrepancies. Drawings And Documentation Are Mostly Accurate And Complete, Meeting The Majority Of Requirements. Acceptable Compliance (70 Points): The Submission Satisfies Most Of The Specified Requirements And Regulations, Albeit With Some Notable Omissions Or Inconsistencies. Drawings And Documentation Are Generally Accurate And Complete, Meeting The Basic Expectations. Some Reservations (50 Points): The Submission Partially Meets The Specified Requirements And Regulations, With Several Notable Deficiencies Or Inconsistencies. There Are Significant Gaps Or Inaccuracies In The Drawings And Documentation, Raising Concerns About Compliance. Serious Reservations (20%) The Submission Falls Significantly Short Of Meeting The Specified Requirements And Regulations, With Major Deficiencies Or Inconsistencies. Drawings And Documentation Lack Essential Details Or Fail To Comply With Key Standards, Casting Doubt On The Bidder's Understanding Of The Project Scope. Unacceptable (0%) The Submission Fails To Comply With The Specified Requirements And Regulations, Lacking Essential Details And Demonstrating A Fundamental Misunderstanding Of The Project Scope. Drawings And Documentation Are Incomplete Or Inaccurate, Indicating A Lack Of Capability To Deliver The Project On Time. B. Functionality And Efficiency: Excellent (100%): The Design Optimally Utilizes Space, Facilitating Efficient Accommodation Of 500 Psdl. Layout And Design Enhance Operational Flow, Demonstrating Exceptional Foresight And Planning. Integration Of Facilities Promotes Smooth Prison Management. Good (80%): The Design Effectively Utilizes Space, With Minor Areas For Improvement In Operational Flow. Layout And Design Contribute To Efficient Prison Management, Meeting Most Functional Requirements. Acceptable (70%): The Design Adequately Utilizes Space, Meeting Basic Requirements For Accommodating 500 Psdl. Layout And Design Support Operational Flow, Though Some Improvements Are Needed For Optimal Functionality. Some Reservations (50%): The Design Partially Optimizes Space Utilization, With Notable Deficiencies In Operational Flow. Layout And Design Hinder Efficient Prison Management, Requiring Significant Adjustments For Improvement. Serious Reservations (20%): The Design Inadequately Utilizes Space, Hindering Accommodation Of 500 Psdl. Layout And Design Severely Impede Operational Flow, Indicating A Lack Of Understanding Of Functional Requirements. Unacceptable (0%): The Design Fails To Optimize Space Utilization, Lacking Consideration For Accommodating 500 Psdl. Layout And Design Pose Significant Obstacles To Efficient Prison Management, Indicating A Fundamental Misunderstanding Of Functional Requirements. C. Safety And Security: Excellent (100%): The Design Features Robust Perimeter Walls, Guard Towers, And Security Features Ensuring Optimal Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Highly Reliable, With Comprehensive Safety Measures For Both Psdl And Staff. Good (80%): The Design Incorporates Effective Perimeter Walls, Guard Towers, And Security Features, With Minor Areas For Enhancement. Fire Protection And Detection Systems Are Reliable, With Adequate Safety Measures For Psdl And Staff. Acceptable (70%) The Design Includes Satisfactory Perimeter Walls, Guard Towers, And Security Features, Meeting Basic Requirements For Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Functional, With Sufficient Safety Measures For Psdl And Staff. Some Reservations (50%): The Design Features Partially Effective Perimeter Walls, Guard Towers, And Security Features, With Notable Deficiencies In Pdl Containment And Facility Security. Fire Protection And Detection Systems Lack Reliability, With Limited Safety Measures For Psdl And Staff. Serious Reservations (20%): The Design Lacks Effective Perimeter Walls, Guard Towers, And Security Features, Compromising Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Inadequate, Posing Significant Risks To Psdl And Staff Safety. Unacceptable (0%): The Design Neglects Perimeter Walls, Guard Towers, And Security Features, Failing To Ensure Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Absent Or Non-functional, Posing Severe Risks To Psdl And Staff Safety. D. Sustainability And Environmental Considerations: Excellent (100%): The Design Includes Robust Safety Measures And Emergency Protocols, Ensuring The Safety And Well-being Of Psdl And Staff In Accordance With Ra 10575. Good (80%): The Design Integrates Sustainable Design Principles Effectively, With Minor Opportunities For Improvement In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Adequate, Supporting Environmental Sustainability. Acceptable (70%) The Design Includes Basic Sustainable Design Principles, Meeting Minimum Requirements For Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Functional, Contributing To Environmental Sustainability. Some Reservations (50%): The Design Partially Incorporates Sustainable Design Principles, With Notable Deficiencies In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Lack Comprehensiveness, Limiting Environmental Sustainability. Serious Reservations (20%): The Design Lacks Consideration For Sustainable Design Principles, Neglecting Energy Efficiency And Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Insufficient, Undermining Environmental Sustainability. Unacceptable (0%): The Design Disregards Sustainable Design Principles, Showing No Commitment To Energy Efficiency Or Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Absent Or Inadequate, Disregarding Environmental Sustainability. E. Aesthetics And Architectural Design: Excellent (100%): The Design Exhibits Exceptional Aesthetic Appeal And Architectural Coherence, Showcasing Innovative And Visually Pleasing Elements. Consideration Of Local Architectural Vernacular And Contextual Integration Is Evident, Contributing To The Overall Excellence Of The Design. Good (80%): The Design Demonstrates Good Aesthetic Appeal And Architectural Coherence, With Some Areas For Enhancement In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Apparent, Enriching The Design. Acceptable (70%): The Design Achieves Acceptable Aesthetic Appeal And Architectural Coherence, Meeting Basic Expectations For Visual Presentation. Consideration Of Local Architectural Vernacular And Contextual Integration Is Present, Though Limited In Scope. Some Reservations (50%): The Design Lacks Significant Aesthetic Appeal And Architectural Coherence, With Notable Deficiencies In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Minimal, Detracting From The Overall Quality Of The Design. Serious Reservations (20%): The Design Exhibits Poor Aesthetic Appeal And Architectural Coherence, Failing To Engage Visually Or Inspire Interest. Consideration Of Local Architectural Vernacular And Contextual Integration Is Lacking, Diminishing The Design's Relevance And Appropriateness. Unacceptable (0%): The Design Lacks Any Aesthetic Appeal Or Architectural Coherence, Showing No Effort To Engage Visually Or Integrate With The Local Architectural Vernacular. Consideration Of Contextual Integration Is Absent, Rendering The Design Unsuitable For The Project. 8.1.2 Approach And Methodology For Detailed Engineering, Design, And Construction (40 Points) Excellent (100%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Exceptionally Clear, Feasible, Innovative, And Comprehensive. The Plan Demonstrates A High Level Of Understanding Of Project Problems, Risks, And Suggested Solutions, With Well-defined Strategies For Addressing Them. Good (80%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Clear, Feasible, And Comprehensive, With Some Innovative Elements. The Plan Adequately Addresses Project Problems, Risks, And Suggested Solutions, Though Some Areas May Require Further Development. Acceptable (70%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Satisfactorily Addresses Project Requirements, With A Basic Level Of Clarity And Feasibility. The Plan Outlines Strategies For Addressing Project Problems, Risks, And Suggested Solutions, Meeting The Minimum Expectations. Some Reservations (50%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Partially Addresses Project Requirements, With Notable Gaps In Clarity And Feasibility. The Plan Lacks Innovative Elements And May Inadequately Address Project Problems, Risks, And Suggested Solutions. Serious Reservations (20%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Demonstrates Significant Deficiencies In Clarity, Feasibility, And Comprehensiveness. The Plan Fails To Adequately Address Project Problems, Risks, And Suggested Solutions, Indicating A Lack Of Understanding Or Inadequate Planning. Unacceptable (0%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Unclear, Infeasible, And Lacks Comprehensiveness. The Plan Fails To Address Project Problems, Risks, And Suggested Solutions, Indicating A Fundamental Misunderstanding Or Disregard For Project Requirements. 8.1.3 Quality Of Personnel Assigned To The Project (25 Points) Excellent (100%): The Personnel Assigned To The Project, Including Key Staff, Are Highly Suitable And Competent To Perform Their Duties. Key Staff Members Possess Exceptional Qualifications, Competence, Education, And Training Relevant To Their Roles, Demonstrating A High Level Of Expertise And Experience. Good (80%): The Personnel Assigned To The Project, Including Key Staff, Are Suitable And Competent To Perform Their Duties Effectively. Key Staff Members Possess Relevant Qualifications, Competence, Education, And Training, Demonstrating Solid Expertise And Experience. Acceptable (70%): The Personnel Assigned To The Project, Including Key Staff, Meet The Basic Requirements For Suitability And Competence In Performing Their Duties. Key Staff Members Possess General Qualifications And Competence, Education, And Training Relevant To Their Roles, Meeting The Minimum Expectations. Some Reservations (50%): The Personnel Assigned To The Project, Including Key Staff, Demonstrate Some Suitability And Competence In Performing Their Duties, But Notable Deficiencies Are Present. Key Staff Members May Lack Certain Qualifications, Competence, Education, Or Training, Raising Concerns About Their Ability To Effectively Fulfill Their Roles. Serious Reservations (20%): The Personnel Assigned To The Project, Including Key Staff, Exhibit Significant Deficiencies In Suitability And Competence To Perform Their Duties. Key Staff Members Lack Essential Qualifications, Competence, Education, Or Training, Indicating A Lack Of Expertise Or Experience Relevant To Their Roles. Unacceptable (0%): The Personnel Assigned To The Project, Including Key Staff, Are Unsuitable And Incompetent To Perform Their Duties Effectively. Key Staff Members Lack The Necessary Qualifications, Competence, Education, And Training, Demonstrating A Fundamental Mismatch With The Requirements Of Their Roles. 8.2 Determination Of The Merit Point Score The Aggregate Of The Scores In Each Criterion Must Be 70% Or More To Pass Using The Following Formula In Equation. Description Weight (w) Rating (r) Criteria 1 35% (smax/sact) Criteria 2 40% Sact Criteria 3 25% Sact Smax = Η (100) Sact = R1 +r2 +r3 + . . .(rη) Where Η = Number Of Sub Criteria R = Rating Given To The Criteria/sub Criteria The Actual Score (sact) For Each Of The Criteria/sub Criteria Is Obtained By Adding All The Given Rating. (smax) Is The Summation Of Maximum Score Per Criteria 8.3 Passing Rate The Specific Passing Rate Value Depends On The Specific Context Of The Project, The Priorities Of The Design And Build Committee, And The Complexity Of The Requirements Outlined In Ra 10575. Based On The Provided Criteria And Descriptions, The Passing Rate For The Merit Point Criteria (mpc) Could Be Set At 75%. This Means That Bidders Must Score At Least 75% Or Higher In The Evaluation Process To Be Considered As Meeting The Minimum Requirements For The Project A. Pass Rate Per Criteria Will Be Determined Using The Formula: Score = W1*r1 + W2*r2 + W3*r3 B. A Bid Or Technical Bid That Failed In Any Of The Criteria’s Will Not Be Considered For Further Evaluation C. Score Above 75% Will Be Considered As Technically Responsive. Aggregate Score Of Less Than 75% Will Be Considered Failed, And May Be Rejected On That Basis. Second-step Procedure: Only Those Bids That Passed The Above Criteria Shall Be Subjected To The Second Step Of Evaluation. The Bac Shall Open The Financial Proposal Of Each “passed” Bidder And Shall Evaluate It Using Non-discretionary Criteria – Including Arithmetical Corrections For Computational Errors – As Stated In The Bidding Documents, And Thus Determine The Correct Total Calculated Prices. The Bac Shall Automatically Disqualify Any Total Calculated Bid Price Which Exceeds The Abc 9. Data To Be Provided By The Bucor These Data Are For Reference Only And Does Not Guarantee The Contractor That The Data Provided Are Correct, Free From Error, And Applicable To The Project At Hand. The Contractor Is Responsible For The Accuracy Or Applicability Of Any Data That He Will Use In His Design– Build Proposal And Services. Sample Data For Buildings: A. Conceptual Plans 10. Documents To Be Provided By The Contractor During Contract Implementation A. Detailed Architectural And Engineering Plans B. Design Analysis C. Survey Data D. Quantity Calculation E. Detailed Geotechnical Investigation Report F. Design Report. G. As-built Plans, (printed Including Cad Files And Bim Files (lod 500) H. Other Relevant Documents 11. Design And Build Period The Winning Bidder Shall Commence Actual Works Upon The Issuance By The Bucor Of The Notice To Proceed (ntp). The Winning Bidder Shall Complete The Daed And Submit Within The Ninety (60) Calendar Days (cds) Period To The Bucor For Review And Approval. The Contractor Shall Complete The Construction Of The Building Within 305 Cds For The Total Contract Duration Of 365 Cd. Conforme: Name Of Company In Print Signature Over Printed Name Of Authorized Representative/date Section Vii. Drawings The Conceptual Drawings Should Be Attached To This Section Or Annexed In A Separate Folder As Part Of The First Envelope (technical Component Envelope). Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: At Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 1. Location Plan/vicinity Map 2. Perspective 3. Floor Plans 4. Front View Elevation 5. Rear View Elevation 6. Left Side View Elevation 7. Right Side View Elevation 8. Longitudinal Section 9. Transverse Section Section Viii. Bill Of Quantities The Bill Of Quantities Should Be Attached To This Section As Part Of The Second Envelope (financial Component Envelope). Section Ix. Checklist Of Technical And Financial Documents Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (d) Special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc) And Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate Or Board Resolution/partnership Resolution In Case Of A Corporation, Partnership, Or Cooperative; Or Original Notarized Special Power Of Attorney In Case Of Sole Proprietorship Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. And ⬜ (h) Conformity With The Technical Specifications (scope Of Work); And ⬜ (i) Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 1. Location Plan/vicinity Map 2. Perspective 3. Floor Plans 4. Front View Elevation 5. Rear View Elevation 6. Left Side View Elevation 7. Right Side View Elevation 8. Longitudinal Section 9. Transverse Section ⬜ (j) Design And Construction Method And ⬜ (k) Value Engineering Analysis Of The Design And Construction Method. And Financial Documents ⬜ (l) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. And Class “b” Documents ⬜ (m) Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And Its Irr. Each Partner Of The Joint Venture Shall Submit Their Respective Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. Ii. Financial Component Envelope ⬜ (n) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (o) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (p) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (q) Cash Flow And Payment Schedule. Bidding Form Company Letterhead Statement Of Ongoing Government & Private Contracts Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Statement Of All Its Ongoing Government And Or Private Contracts Including Contracts Awarded But Not Yet Started, If Any Whether Similar Or Not Similar In Nature. Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Date Of Completion Or Estimated Completion Time Value Of Outstanding Works Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Statement Of Single Largest Completed Contract Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Statement Of Single (1) Largest Completed Contract Of Similar In Nature Within The Last Six (6) Years From The Date Of Submission And Receipt Of Bids Amounting To At Least Fifty Percent (50%) Of The Approved Budget Of The Contract (abc) Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Amount Of Completed Contracts, Adjusted By The Bidder To Current Prices Using Psa’s Consumer Price Index, If Necessary Date Of Completion Or Estimated Completion Time Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: Bureau Of Corrections I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. ______________________________________________________ [insert Name Of Bidder’s Authorized Representative] _____________________________ [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ Issued On ______________ At ___________________________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued Doc. No. _____ Page No. _____ Book No. _____ Series Of ____ Company Letterhead Omnibus Sworn Statement Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) _________________________________________________________________________ Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections, As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections, As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase). 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 2024 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ And Issued On ____________________ At _____________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Certificate Of Net Financial Contracting Capacity Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (please Show Figures At How You Arrived At The Nfcc) This Is To Certify That Our Net Financial Contracting Capacity (nfcc) Is _____________________ (p____________) Which Is At Least Equal To The Total Ceiling Price We Are Bidding. The Amount Is Computed As Follows: (please Show Computation Of Nfcc) Nfcc = (ca-cl) (15) – C Where: Ca = Current Assets Cl = Current Liabilities C = Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Going Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project Note: The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Audited Financial Statement Submitted To The Bir. Issued This _________________day Of ________________, 2024 _______________________________________________ Name & Signature Of Authorized Representative ____________________ Position _______________ Date Company Letterhead Bid Form Date: Ib No: To Bids And Awards Committee Bureau Of Corrections Nbp Reservation Muntinlupa City We, The Undersigned, Declare That: (a) We Have Examined And Have No Reservation To The Bidding Documents, Including Addenda, For The Contract Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (b) We Offer To Execute The Works For This Contract In Accordance With The Bid And Bid Data Sheet, General And Special Conditions Of Contract Accompanying This Bid; The Total Price Of Our Bid, Excluding Any Discounts Offered Below Is: ________________________________________₱_________________; The Discounts Offered And The Methodology For Their Application Are: [insert Information]; (c) Our Bid Shall Be Valid For A Period Of 120 Calendar Days From The Date Fixed For The Bid Submission Deadline In Accordance With The Bidding Documents, And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period; (d) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of 30% Percent Of The Contract Price For The Due Performance Of The Contract; (e) Our Firm, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Have Nationalities From The Following Eligible Countries; (f) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (g) Our Firm, Its Affiliates Or Subsidiaries, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Has Not Been Declared Ineligible By The Funding Source; (h) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (i) We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Other Bid That You May Receive. (j) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections. (k) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be A Ground For The Rejection Of Our Bid. Name: In The Capacity Of: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________
Closing Date20 Jan 2025
Tender AmountPHP 300 Million (USD 5.1 Million)

YOU ARE THE CITY OF SKVOREC Tender

Corrigendum : Closing Date Modified
Czech Republic
Details: The subject of the Public Contract is Construction Work and Related Supplies and Services Consisting of the Implementation of a New Building of a Civic Facilities Facility Serving Preschool Education in the Township of Škvorec in the Central Bohemian Region, on Plot No. 50/25 A 1389 in K.ú. Škvorec, Including the Necessary Preparation of Areas, Paved Areas, Terrain Improvements, Realization of Overlays, Construction of Connections and Engineering Networks, Construction Works and Technological Objects and Other Construction Components, Using the Design & Build Method. Therefore, Projection Work is also the subject of Public Procurement. The architectural and structural solution is described in more detail in the Architectural Study entitled: "Škvorec Kindergarten", which is part of this Tender Documentation. Part of the construction is the execution of clean floor surfaces, tiling and paving, but not the delivery of interior equipment and outdoor garden equipment. Indoor equipment and outdoor equipment of the garden will be part of a separate procurement procedure. Part of the Subject of Fulfillment of the Public Contract Is In particular: 1. Project Documentation, which will include the following parts: A. Documentation for the Construction Permit in the Planning Permit Procedure, B. Documentation for the Implementation of the Construction, C. Documentation of the Actual Implementation of the Construction Incl. Geometrical Plan and Focus of the Actual Construction, D. Operational Documentation, E. Documentation for the Needs of the Cadastral Office. 2. Provision of Engineering Services; 3. Construction of the New Building of the Civic Facilities Facility Serving Preschool Education in the Town of Škvorec, i.e. Execution of construction works and technological objects in accordance with this procurement documentation. The Project Documentation Listed in Point 1. Above Must Be Prepared in Compliance with the New Construction Act No. 283/2021 Coll., Construction Act, As Amended and According to the Relevant Implementing Legal Regulations, in particular with Decree No. 131/2024 Coll., Decree On Construction Documentation and Decree 146/2024 Coll., On Construction Requirements. Part of the provision of engineering services in point 2. It includes Also Legalization of Existing Wells Located at the Place of Fulfillment of the Public Contract, If This Is Necessary, Including Securing Permits for Water Absorption. In order to process the next stages of the project documentation, it is necessary to ensure the processing of the following surveys and studies, which are also part of the scope of the Public Contract: A. Lighting and Sunlight Studies, B. Acoustic Studies, C. Detailed Engineering-Geological Survey, D. Detailed Hydrogeological Survey , E. Determination of Radon Index of Land, F. Pumping Test and Laboratory Assessment of Water Quality of Existing Well and Including Its Use for Irrigation and/or Toilet Flushing (Primarily Water Should be Used for Toilet Flushing), G. Thermal Technical Construction Solution and Certificate Energy Requirements of Buildings. The contracting authority also requires that part of the subject of the performance of the public contract also includes the management of rainwater, including the construction of an accumulation or retention tank for the further use of this water, e.g. For Irrigation. More detailed information is provided in other parts of the Public Procurement Terms and Conditions, which are an integral part of the Tender Documentation of this Public Procurement, i.e. In the Architectural Study With the Title: "Škvorec Kindergarten", the Protocol and Certificate of the Energy Performance of the Building Pursuant to Decree No. 264/2020 Coll. With the Name: "Škvorec Kindergarten", Specification of Standards With the Name: "Škvorec Kindergarten" and a Binding Sample Contract.
Closing Date16 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE ARMY USA Tender

Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
United States
Details: 1. Contract Information: This Contract Is Being Procured In Accordance With The Brooks A-e Act As Implemented In Far Subpart 36.6. Firms Will Be Selected For Negotiation Based On Demonstrated Competence And Qualifications For The Required Work. See Numbered Note 24 For General Information On The A-e Selection Process. A-e Services Are Required For Site Investigation, Concept Design, Final Design (option), And Construction Phase Services (option) For The Subject Project. North American Industrial Classification System Code Is 541330, Which Has A Size Standard Of $25,500,000 In Average Annual Receipts. This Announcement Is Open To All Businesses Regardless Of Size. Far Clause “52.219-4 Notice Of Price Evaluation Preference For Hubzone Small Business Concerns” Will Be Included In The Solicitation. A Firm-fixed-price Contract Will Be Negotiated. The Contract Is Anticipated To Be Awarded In Sep 2025 And Design Completed By Oct 2028. A-e Contract Price Is Estimated To Be More Than $10,000,000. If A Large Business Is Selected For This Contract, It Must Comply With Far 52.219 -9 “small Business Subcontracting Plan” Regarding The Requirement For A Subcontracting Plan On That Part Of The Work It Intends To Subcontract. This Action Will Be Subject To Far Clause 52.219-14 “limitations Of Subcontracting.” For The Purposes Of This Solicitation, This Acquisition Is To Be Considered A Service And As Such, The Government Will Not Pay More Than 50% Of The Amount Paid By The Government For Contract Performance To Subcontractors That Are Not Similarly Situated Entities. Any Work That A Similarly Situated Entity Further Subcontracts Will Count Towards The Prime Contractor's 50% Subcontract Amount That Cannot Be Exceeded. When A Contract Includes Both Services And Supplies, The 50% Limitation Shall Apply Only To The Service Portion Of The Contract; The Subcontracting Goals For The New York District Which Will Be Considered In The Negotiation Of This Contract Are: (1) At Least 25%, But No More Than 49% Of A Contractor's Intended Subcontract Amount Be Placed With Small Businesses (sb); (2) At Least 5 % Of A Contractor's Intended Subcontract Amount Be Placed With Small Disadvantaged Businesses (sdb); (3) At Least 3% Of A Contractor's Intended Subcontract Amount Be Placed With Women-owned Sb (wosb); (4) At Least 3% Of A Contractor's Intended Subcontract Amount Be Placed With Service-disabled Veteran-owned Sb; (5) At Least 3% Of A Contractor's Intended Subcontract Amount Be Placed With Veteran-owned Sb; And (6) At Least 3% Of A Contractor's Intended Subcontract Amount Be Placed With Hubzone Sb. The Plan Is Not Required With This Submittal, But Will Be Required With The Fee Proposal Of The Firm Selected For Negotiations. To Be Eligible For Contract Award, A Firm Must Register For An Unique Entity Id, A 12-character Alphanumeric Id Assigned To An Entity By Sam.gov. New Entities Can Get Their Unique Entity Id At Sam.gov And Complete An Entity Registration. 2. Project Information: Replace, By Deconstruction And Reconstruction, A Multi-story General Instruction Building. Rehabilitate The Original Features Of The Building Constructed In 1911 Which Have Survived. The Primary Facility Will Provide Spaces For General Instruction Classrooms, Lecture Halls And Collaboration Space, Administrative Space With Private And Open Offices, An Auditorium, Lab Space, Conference Rooms, Reception Areas, A Library And Mock Courtroom, An Arms Vault, Showers And Bathrooms, Lactation Rooms, Copy Rooms, Staff Break Rooms, Departmental Storage, Vending Areas And A Cafe, As Well As Freight And Passenger Elevators. Cybersecurity Measures, Electronic Security Systems (pacs & Ids) Installation, Energy Measurement And Control System (emcs) Connection, Building Information Systems, And Fire Alarm And Protection Systems Will Be Included. Supporting Facilities Include Utility Connections (water, Sanitary Sewer, Electrical), Storm Drainage, Walks, Curbs And Gutters, Landscaping, And Site Improvements. Heating Will Be Provided By District Heat, And Air Conditioning Will Be Provided By A Steam Powered Absorptive Chiller System. Comprehensive Building And Furnishings Related Interior Design Services Are Required. This Project Will Be Designed For Accessibility And Usability By Individuals With Disabilities. Utility Connections Are Required To Privatized Electric Distribution, Water, And Wastewater Systems. The Army Intends To Have The Respective Utilities Privatization System Owners, American Water And City Light & Power Make And Own The Necessary Connections Up To The Facility Service Disconnect Or Other Defined Point Of Demarcation. Facilities Will Be Designed To A Minimum Life Of 40 Years In Accordance With Dod's Unified Facilities Criteria (ufc 1-200-02) Including Energy Efficiencies, Building Envelope And Integrated Building Systems Performance. Demolish The Portion Of The Building Constructed In 1955 (321,012 Total Sf). U.s. Military Academy (usma) Has A Substantial Deficit Of -412,799 Square Feet In General Instructional Space, And This Project Will Address A Portion Of That Deficit By Constructing A New Addition. The New Addition, Exterior Alterations, And Related New Construction Will Not Destroy Historic 1911 Materials, Features, And Spatial Relationships That Characterize The Property. The New Work Will Be Differentiated From The Old And Will Be Compatible With The Historic Materials, Features, Size, Scale And Proportion, And Massing To Protect The Integrity Of The Property And Its Environment. The New Addition And Adjacent Or Related New Construction Will Be Undertaken In Such A Manner That, If Removed In The Future, The Essential Form And Integrity Of The Historic 1911 Property And Its Environment Would Be Unimpaired. Moreover, This Project Will Consolidate Key Programs In One Facility. By Upgrading And Consolidating Key Programs Into A Central Location Within The Main Campus, The Academy Aims To Foster A More Cohesive Academic Environment While Addressing Its Instructional Space Deficit. The Centralization Of Programs Will Reduce The Physical Fragmentation Of Departments And Encourage More Cross-disciplinary Collaboration. This Approach Aligns With Modern Educational Trends, Where Academic Institutions Are Moving Towards Flexible, Multi-purpose Spaces That Encourage Interaction And Innovation. Bringing Key Programs Together In Adequately Sized Spaces Will Not Only Optimize The Use Of Space But Also Create An Atmosphere Where Students And Faculty From Different Disciplines Can Engage In Meaningful Collaboration, Enhancing The Learning Experience. This Project Is Required To Update The Flagship Schoolhouse, Thayer Hall, As Part Of The Academic Building Upgrade Program (abup), Which Was Conceived To Address Critical Gaps In Instructional Space And Ensure That Academic Buildings Meet Both The Current And Future Needs Of The Usma's Academic Departments. Thayer Hall Will Support A Student Load Of 2,880 Students. The Project's Primary Goal Is To Reduce The Instructional Space Deficit. By Upgrading The Instructional Facilities, The Academy Seeks To Align Itself With Contemporary Educational Standards, Which Prioritize Collaborative Learning, Cross-disciplinary Interaction, And Active Engagement Between Students And Faculty. The Contract Will Require Accomplishment Of Site Investigation Work. The Contract Will Require Preparation Of Parametric Design Considered To Be 5 – 15 Percent Of The Total Design Effort. The Contract Will Require Preparation Of Concept Design Considered To Be 35 Percent Of The Total Design Effort. As An Option, The Contract Will Require Preparation Of 60%, 90%, And Final 100% Designs. As An Option, The Contract Will Require Delivery Of Construction Phase Ae Services. The Estimated Construction Cost Of This Project Is Over $500,000,000. Cost Estimates Must Be Prepared Using The Corps Of Engineers Micro Computer Aided Cost Estimating System (mcaces) – Second Generation (mii). The Contractor Shall Be Responsible For Accomplishing Designs And Preparing Drawings Using Advanced Modeling And Delivering The Three-dimensional Drawings In Autodesk Revit And Autodesk Civil 3d Software. The Government Will Only Accept The Final Product For Full Operation, Without Conversion Or Reformatting, In The Target Advanced Modeling Software Format, And On The Target Platform Specified Herein. Drawings Shall Be Compliant With The Current A/e/c Cad Standard Available From The Cad/bim Technology Center, Engineer Research And Development Center. 3. Selection Criteria: The Selection Criteria For This Particular Project Are Listed Below In Descending Order Of Importance (first By Major Criterion And Then By Each Sub- Criterion). Criteria A-e Are Primary. Criteria F-g Are Secondary And Will Only Be Used As "tie-breakers" Among Firms That Are Essentially Technically Equal. a. Submit No More Than Ten Projects Which Demonstrate Specialized Experience And Technical Competence In Design Of Facilities Similar To The Project Described Herein. Submitted Projects Should Have A Construction Cost Of At Least $100,000,000. Submitted Projects Should Have A Construction Completion Date No Earlier Than January 2015. On All Example Projects, The Government May Consider The Following Strengths For Evaluation Purposes: (1) Design Of Facility Renovations For Older/historic Institutions Of Higher Learning. (2) Application Of The Secretary Of The Interior’s Standards For The Treatment Of Historic Properties And Compliance With Section 106 Of The National Historic Preservation Act. (3) Sustainable Design Using An Integrated Design Approach And Emphasizing Environmental Stewardship, With Experience In Energy And Water Conservation And Efficiency; Use Of Recovered And Recycled Materials; Waste Reduction; Reduction Or Elimination Of Toxic And Harmful Substances In Facilities Construction And Operation; Efficiency In Resource And Materials Utilization; Development Of Healthy, Safe, And Productive Work Environments; And Employing The Leed Evaluation And Certification Methods. (4) Conducting Whole Building Life Cycle Cost Analysis (wb Lcca) Considering The Cradle-to-grave Costs Associated With Upfront Construction, Lifetime Building Sustainment, Maintenance, Operations (including Energy And Water Use), And Building Disposal, To Target The Most Cost-effective Design To Achieve Modeled Building Energy Consumption Reduction By A Minimum Of 30% Below The Ashrae 90.1 Baseline Specified In 10 Cfr 433 Without The Use Of Fossil Fuel Combustion Systems, With The Goal Being To Select The Optimal Combination Of Interdependent Building Systems (e.g. Envelope, Hvac, Hot Water, Lighting, Wall And Floor Thermal Mass Capacity, Etc). (5) Design Of Resilient Buildings, I.e. A Building That (i) Maximizes The Ability Of The Owner/operator To Withstand And Recover From A Potentially Disruptive Event That May Adversely Affect Mission Assurance And Mission-essential Functions, Including Extreme Weather (as Defined By 10 U.s.c. 101(a)(20)) Or A Disruption To Energy Or Water Supplies; (ii) Has Minimal Energy And Water Demand; (iii) Has An Indoor Environment Optimized To Promote Human Safety, Physical And Psychological Health, And Productivity; And (iv) Integrates Carbon-free Energy Generation And Storage. (6) Design Of Building Stabilization And Structural Shoring And Bracing Systems. (7) Experience Of The Prime Firm And Significant Subconsultants, Particularly The Cost Engineering Firm, The Geotechnical Drilling Firm, And The Asbestos/lead/pcb/hazmat Consulting Firm, In Working Together. b. Qualified Professional Personnel In The Following Key Disciplines: Aabc Certified Commissioning Authority (cxa), Accredited Learning Environment Planner (alep), Architecture, Asbestos/lead/pcb/hazmat Consulting, Certified Value Specialist, Civil Engineering, Clc Or Cld Certified Lighting Consulting, Comptia Certified Cybersecurity Consulting, Construction Project Scheduler Experienced With Primavera P6, Cost Engineering, Cts Certified Audio/visual Consulting, Electrical Engineering, Electronic Security Engineering, Fire Protection Engineering, Geotechnical Engineering, Historic Preservation Architecture, Ince Certified Acoustical Consulting, Land Surveying, Landscape Architecture, Leed Accredited Professional, Mechanical Engineering, Ncidq Or State Licensed Interior Design, Project Management, Structural Engineering, Telecommunications Engineering, And Vertical Transportation Engineering. The Lead Architect Or Engineer In Each Discipline Must Be Registered To Practice In The Appropriate Professional Field. The Civil Engineer, Asbestos/lead/pcb/hazmat Consultant And Land Surveyor Must Be Registered To Practice In New York. The Evaluation Will Consider Education, Certifications, Training, Registration, Overall And Relevant Experience, And Longevity With The Firm. c. Past Performance On Dod And Institution Of Higher Learning Contracts With Respect To Cost Control, Quality Of Work, And Compliance With Performance Schedules, As Determined From Cpars And Other Sources. d. Capacity To Submit The Draft Parametric Design Report (pdr) (10% Complete) By January Or February 2026, To Submit The Corrected Pdr (15% Complete) By April 2026, To Submit The Draft Concept Design (30% Complete) By June Or July 2026, To Submit The Corrected Concept Design (35% Complete) By September 2026, To Submit The 35% Certification Package (consisting Of Final Eng 3086, Designated Construction Agent Assessment Eng 6196, And Cost Schedule Risk Analysis Documentation) By November 2026 And Complete The Final Design (option) By October 2028. Schedule Is Critical For The Project. The Evaluation Will Consider The Experience Of The Firm And Any Consultants In Similar Size Projects, And The Availability Of An Adequate Number Of Personnel In Key Disciplines. e. Knowledge Of Design Of Foundations Bearing On Granite Or Gneiss Bedrock, Design Of Building Systems For Marine, Mixed-humid, And Cold Climate Zones, Rehabilitation Of Historic Stone Masonry, Design Complying With The Department Of Defense (dod) Unified Facilities Criteria, Design Complying With The Department Of The Army Policy Guidance On Resilient Buildings, Or Design Subject To Review By The New York State Historic Preservation Officer Or The New York State Department Of Environmental Conservation. f. Extent Of Participation Of Sb (including Wosb), Sdb, Historically Black Colleges And Universities, And Minority Institutions In The Proposed Contract Team, Measured As A Percentage Of The Total Estimated Effort. g. Volume Of Dod A-e Contract Awards In The Last 12 Months, With The Objective Of Effecting An Equitable Distribution Of Dod A-e Contracts Among Qualified Firms, Including Sb And Sdb. 4. Submission Requirements: Interested Firms Having The Capabilities To Perform This Work Must Submit Sf 330 Part I And Sf 330 Part Ii For The Prime Firm And All Consultants, To Jordan.k.moran@usace.army.mil Not Later Than 11:59 Pm Est On The Response Date Indicated Above. The Sf 330 Part I Shall Not Exceed 100 Pages (pdf Formatted To 8.5” X 11” Page Size), Including No More Than 50 Pages For Section E. Use No Smaller Than 12 Font Type. The Firm Is Encouraged, But Not Required, To Include Their Sam.gov-assigned Unique Entity Id Number In Sf 330, Part I, Section H. In Section H Describe The Firm's Overall Design Quality Management Plan (dqmp). A Project-specific Design Quality Control Plan Must Be Prepared And Approved By The Government As A Condition Of Contract Award But Is Not Required With This Submission. In Section H Also Indicate The Estimated Percentage Involvement Of Each Firm On The Proposed Team. The Most Highly Qualified Firms Will Be Interviewed. Neither Facsimile Nor Paper Hardcopy Transmissions Will Be Accepted. Solicitation Packages Are Not Provided, And No Additional Project Information Will Be Given To Firms During The Announcement Period. This Is Not A Request For Proposal. The Government Intends To Notify Interested Firms Of The Selection Or Non-selection Decision By March 2025. point Of Contact: Jordan Moran, (917) 908-8121 email Your Questions To Us Army Corps Of Engineers New York District At Jordan.k.moran@usace.army.mil
Closing Date21 Jan 2025
Tender AmountRefer Documents 

City Of Winnipeg Tender

Environmental Service
Canada
Details: Full Title: Professional Consulting Services For Environmental Site Assessment (esa), Decommissioning And Alternative Land Use Plan For Former Sludge Drying Beds D7. Scope Of Services D7.1 The Major Components Of The Work Identified In This Section Shall Form The Minimum Requirements And Anticipated High Level Sequence Of Work. The Proponent Is Encouraged To Review The Major Work Components And Provide Additional Information On How The Work Components Could Be Altered, Updated, Or Sequenced Appropriately As Part Of Their Proposal Submission. D7.2 Review All Applicable Information, Data, Surveys, Reports And Existing Drawings Related To The Project Including, But Not Limited To The Information Contained In This Rfp. D7.3 The Services Required Under This Contract Shall Consist The Following: (a)phase I: Complete An Environmental Site Assessment (esa)/existing Infrastructureassessment (referred To Below As ‘phase I Report’) Of The Sludge Drying Beds Site: (i)the Entirety Of This Phase Will Be Paid Out As A Fixed Price Item In Accordance Withsection B9. (ii) The Proponent Will Request And Review All Pertinent Background Reports, Operating Data, And Any Other Data The Consultant Feels Pertinent In The Background Evaluation. (iii) The Proponent Will Submit Any Specific Questions On The Sludge Drying Beds History/use To The City Project Manger To Forward On To Appropriate Staff During This Phase. (iv) The Majority Of The Work Within This Phase Is Tied To The Submission Of Phase I Report, Which Will Include The Following At Minimum: (i) The Esa Aspects Of This Report Can Be Aligned With The Requirements Of Csa-z768-01 (r2022) For Completion Of A Phase I Environmental Site Assessment, But Does Not Necessarily Need To Comply With All Requirements.  The Intention To Align With Csa-z768-01 (r2022) Is To Provide A Template For The Format For The Report Deliverables. (ii) The Esa Aspects Of This Phase May Also Be Aligned With The Requirements Of Manitoba Environment & Climate’s Guideline For Environmental Site Assessments In Manitoba. (iii) The Following Items Identified Within Csa-z768-01 (r2022) Are Specifically Clarified Related To This Work:  Interviews Can Occur Via Email Inquiries, Submitted To The City Project Manager As Stated In D7.1(a)(iii) Above. They Are Not Required To Be In-person Interviews.  Interviews With Staff Can Occur To Confirm The Status Of Specific Infrastructure Believed To Be Decommissioning Or Still In Operation. Interviews With Staff Can Also Gather Necessary Background On The Current Operational Issues/concerns In The Use Of Existing Infrastructure.  The Proponent Should Consider The Site Visit Requirements For The Purposes Of Reviewing The Entire Site Visually And Taking A Suitable Number Of Photographs To Demonstrate The Current Condition Of The Lands. This Will Be As Part Of Completing The Site Visit Component Of The Phase I Report.  As Part Of The Records Review Component Of The Study, Detailed Review Of Existing Municipal Servicing Drawings Should Be Completed. This Exercise Should Result In A Detailed Infrastructure Inventory Of All Existing Infrastructure Believed To Be Currently In Operation.  The Records Review Should Particularly Focus On Confirming The Extent Of Decommissioning Works Completed Through The 1990s As Part Of Decommissioning The Drying Cells, And Construction Of The Asphalt Drying Pad. (iv) The Following Requirements Will Augment The Typical Requirements Of A Phase I Esa In Accordance With Csa-z768-01 (r2022), In Order To Document The Existing Infrastructure:  Cursory Statements As To The Expected Condition Of The Existing Infrastructure Is Also Be Contained In The Report. Expected Condition Is To Be Assessed Based On The Records Review, Interviews With Staff, And Basic Information Gathered From The Site Visit.  All Infrastructure No Longer In Operation, But Unknown If Fully Decommissioned To Be Documented In This Report Within The Infrastructure Inventory.  All Infrastructure No Longer In Operation, But Known To Be Decommissioned Based On Past Project Work To Be Documented In This Report Within The Infrastructure Inventory.  All Infrastructure Supporting The Current Site Operation, Including The Decant Pump Station And The 5.5 Km Forcemain Extents (3.2km Length Prior To Tying Into The Local Wws System, And The Remaining 2.3km Segment Disconnected But Not Removed) Is To Be Included Within The Infrastructure Inventory Under Consideration. (b) Phase Ii: Complete Sampling/infrastructure Assessment Plan (i) The Entirety Of This Phase Will Be Paid Out As A Fixed Price Item In Accordance With Section B9. (ii) This Plan Is Expected To Be Drafted As A Brief Work Proposal Detailing The Extent Of Sampling And Sampling Finding Reporting, Along With Condition Assessments Or Other Site Inspections Believed To Be Beneficial Is To Be Submitted To The City Project Manager For Approval To Use The Additional Work Allowance To Fund. (iii) This Work Can Occur Concurrently With The Development Of The Phase I Report. It Is Assumed It Will Not Begin Until A Suitable Point Within The Phase I Report Development, However It Is Not Required For The Phase I Report To Be Finalized Before This Work Can Be Initiated. (i) It Should Not Be Initiated Until The Consultant Has A Fundamental Understanding The Site, Its Infrastructure Components, Land Use History, And Risks From The Desktop Assessments Associated With The Phase Report Submission. (ii) It Is Recommended The Proponent Notify The City Project Manager When They Intend To Begin Work In This Phase Within The Proposal, Should It Be Desired To Occur Concurrently With The Phase I Report Submission. (iv) The Sampling Plan Component Of This Proposal Can Be Drafted In Accordance With Csa-z769-00 (r2023) Acting As A Template. This Will Establish All Intrusive Investigations Proposed To Determine Soil And Ground Water Conditions With The Objective Of Determining The Extent Of Impacts, In Any, To Allow For The Preparation Of Remediation Options In Accordance With Phase Iv Of The Work. (v) The Extent Of Samples Completed, Along With The Overall Number Of Samples Proposed To Be Collected And Tested, Is To Be Based On The Specific Environmental Risks Identified In The Esa, Along With The Budget Available With The Additional Work Allowance. (vi) Sampling Shall Be Completed Against Appropriate Environmental Quality Guidelines Or Regulatory Requirements, As Applicable And In The Professional Judgement Of The Proponent. (i) For Example, Soil Samples Are To Be Compared Against The Ccme Soil Quality Guidelines For The Protection Of Environmental And Human Health. (ii) Specific Environmental Quality Guidelines/requirements Assumed To Be Applied Samples Collected Shall Be Documented Within The Sample Plan Of This Proposal. (vii) The Infrastructure Assessment Component Should Present A Sequence Of Tasks To Review/confirm The Condition Of Existing Infrastructure Identified In The Infrastructure Inventory. (viii) The Infrastructure Assessment Component Should Also Present Any Tasks Required To Confirm Existence Or Existing Infrastructure, Or Status Of Decommissioning Of Existing Infrastructure As Required. (ix) The Scope Of Condition Assessment Tasks Is To Be Determined By The Consultant Based On The Risks/condition Of Specific Infrastructure, The Extent Of Existing Infrastructure To Be Assessed, Along With The Budget Available Within The Additional Work Allowance. (x) The Sampling/infrastructure Assessment Plan Shall Include An Updated Safe Work Plan The Consultant Specific For The Site Sample And Infrastructure Assessment Work. (xi) The Estimated Costs For The Tasks Expected In The Sampling/condition Assessment Plan Is To Be Submitted Within The Plan, Utilizing Form P: Person Hours Utilizing Key Personnel Hourly Estimates, Along With Subconsultant Prices. (c) Phase Iii: Complete Soil Testing, Groundwater Monitoring, Or Laboratory Testing Of Samples Collected To Confirm Specific Sources Of Contamination, If Required. Site Investigations To Further Assess The Condition Of Existing Infrastructure On Site, Or To Assess The Status Infrastructure Believed To Be Decommissioned, Are Also To Be Completed In This Phase. (i) The Entirety Of This Phase Will Be Approved Utilizing Funds From The Additional Work Allowance. (ii) The Sampling/infrastructure Assessment Plan Is Expected To Be Complete Before This Phase Can Begin, As This Deliverable Will Form The Proposal For Approval To Utilize The Additional Work Allowance. Under Extenuating Circumstances Such As Seasonal Impacts On Site Investigation Activities, Portions Of This Phase May Be Initiated Or Completed Prior To The Completion Of The Sampling/infrastructure Plan. (iii) The Initiation Of This Work However Can Occur Concurrently With The Remaining Tasks Related To The Development Of The Phase I Report, Under The Condition Where The Sampling/infrastructure Assessment Plan Is Approved Prior To The Completion Of The Phase I Report. (iv) It Is Recommended The Proponent Notify The City Project Manager When They Intend To Begin This Phase Within The Proposal, Should It Be Desired To Occur Concurrently With The Phase I Report Submission. (v) The Conclusion Of This Phase Will Be The Submission Of A Technical Memorandum Which Will Include The Following At Minimum: (i) Summarize/update The Extent Of Site Sampling And Testing Completed, In Comparison To The Extent Of Work Identified In The Sampling/infrastructure Assessment Plan. (ii) Summarize/update The Extent Of Infrastructure Assessments Completed, In Comparison To The Extent Of Work Identified In The Sampling/infrastructure Assessment Plan. (iii) Identify The Results From The Site Sampling And/or Testing, Along With Results From Any On Site Inspections Or Condition Assessments. (iv) Provide An Assessment Of Findings From These Results, In Terms Of Environmental Risk Previously Assumed, Infrastructure Risks Previously Assumed, Etc. (v) Include The Sampling/infrastructure Assessment Plan As An Appendix To This Technical Memorandum. (d) Phase Iv: Complete A Decommissioning And Land Use Plan (i) The Entirety Of This Phase Will Be Paid Out As A Fixed Price Item In Accordance With Section B9. (ii) The Goal Of This Phase Of Work Will Be To Complete All Remaining Engagement With The City Project Team, And Correlate The Data Captured In The Phase I Report And Site Testing Technical Memorandum In Order To Develop The Final Decommissioning And Land Use Plan Document. (iii) A Dedicated Meeting With The Proponent’s Project Team And The City Working Group Members In Attendance Will Be Coordinated Following The Submission Of The First Draft Of This Deliverable. (iv) An Interim Submission Of The Proposed Alternative Land Use Concepts Is To Be Submitted To The City Working Group Prior To The Decommissioning And Land Use Plan First Draft. (i) This Interim Submission Will Then Be Reviewed And Discussed With Appropriate External Stakeholders As Required. (ii) Modifications To The Land Use Concepts May Also Be Proposed By City Staff To Incorporate In The Final Report. (iii) The Content Of This Interim Submission Can Be Directly Incorporated Into The Content Of Decommissioning And Land Use Plan Document. (v) The Decommissioning And Land Use Plan Document Will Include The Following At Minimum: (i) Identify All Additional Site Testing, Infrastructure Inspection, Etc. Believed To Be Necessary In The Future To Verify The Environmental Risks, Asset Condition Risks, Etc. (ii) Document All Remediation Options To Address The Assumed Environmental Risks Identified From The Esa And Site Sampling Work. (iii) Include Recommendations Of Remediation Options Based On The Professional Judgement Of The Proponent, Risk Management Approach, Cost-benefit Analysis, Or Any Other Feedback From City Staff. Specifically Identify Remediation Measures, If Any, To Improve The Surface Runoff Water Quality Such That It Can Be Classified As Stormwater Runoff In The Future. (iv) Document Additional Remediation Measures Required To Accommodate Specific Land Uses, As Required. (v) In Specific Remediation Strategies Are Not Feasible, Then This Should Be Stated. (vi) If The Runoff Can Be Classified As Stormwater And No Longer Needs To Be Conveyed To The Newpcc, A Recommended Land Drainage Servicing Plan To Tie Into The Local Stormwater Collection System Shall Be Included In The Document. (vii) Remediation Options Should Address Primarily On-site Remediation Requirements, With The Exception Of Any Environment Remediation Measures Required For The Existing Forcemain Network Servicing The Sludge Drying Beds. (viii) Develop Conceptual Engineering Assessments Of Work(s) Necessary For Decommissioning/abandoning Existing Infrastructure To Support Alternative Land Uses And/or Existing Land Use.  All Infrastructure Supporting The Current Site Operation, Including The Decant Pump Station And The 5.5 Km Forcemain Extents (3.2km Length Prior To Tying Into The Local Wws System, And The Remaining 2.3km Segment Disconnected But Not Removed) Is To Be Included Within The Decommissioning Works Under Consideration. (ix) Specifically Develop Decommissioning Plans Under The Assumption That All Necessary Remediation Measures Are Completed Such That The Surface Water Quality Can Be Classified As Stormwater. (x) Develop Conceptual Engineering Assessments Of New Municipal Infrastructure Required To Support Alternative Land Uses And/or Existing Land Use. (xi) Consider New Municipal Infrastructure Needs With Respect To The Potential Expansion Of The North Perimeter Highway, And Based On The Latest Information Available Related To This Expansion. See D4.6. (xii) Conduct Any Additional Internal Engagement With Stakeholders Within The City Of Winnipeg Real Estate And Land Development Division, The Wastewater Division, And/or Winnipeg Police Service As Part Of The Development Of The Alternative Land Use Options.  Include An Allowance For One (1) Meeting At Minimum With Internal Stakeholders To Raise Alternative Land Use Options And Reach Consensus On Alternative Land Use Options To Be Considered. See D9.5. (xiii) Complete Alternative Land Use Assessments Based On City Needs For The Space, And Plausible Alternative Land Uses For The Site In The Future. (xiv) Provide An Assessment Of Additional Remediation/decommissioning Requirements To Align With The Current Land Use. (xv) Develop A Aace Class 5 Capital Cost Estimates For Remaining Site Testing Recommended In Accordance With D7.1(d)(iv)(i), Along With The Recommended Site Remediation, Decommissioning, And New Infrastructure Installation Works.  Where New Infrastructure Costs, Remediation Option Costs, Or Decommissioning Option Costs Vary Significantly Depending On Alternative Land Uses Identified Above, Include Capital Cost Scenarios Based On Each Land Use/decommissioning Option. Capital Cost Scenarios To Remain At A Class 5 Level Of Definition.  Clearly Identify All New Infrastructure Costs, Remediation Costs, Or Decommissioning Costs Which Will Be Required Regardless Of Land Use Option, At A Class 5 Level Of Definition.  Utilize The Basis Of Estimate (boe), Class Of Estimate (coe) As Part Of Submission Of This Capital Cost Estimate. See D10.7 (xvi) Compare Alternative Land Use Options, Decommissioning Approaches, Etc And Summarize Pros And Cons Of Each.  Utilize The Net Present Value (npv) City Of Winnipeg Investment Planning Templates To Illustrate The Comparison Of Alternative Land Use Options, Specifically In Terms Of Costs And Benefit Impacts To The City Of Winnipeg. See D10.7 (xvii)include Deliverables Associated With D7.1(a) And D7.1(c) As Appendices To Thedocument. The Decommissioning And Alternative Land Uses Report Is Intendedto Be The Final Summary Deliverable Prepared By The Proponent. D7.3.1 Notwithstanding The Foregoing, The Consultant Is Being Engaged By The City For Its Professional Expertise; The Consultant Shall Bring To The City’s Project Manager’s Attention Any Aspect Of The City’s Standards, Manuals, Guidelines Or Templates Which The Consultant Is Of The Opinion Is Not Consistent With Good Industry Practice. D7.4 The Funds Available For This Contract Are $375,000.00. (a)within This Funds Total: (i)$50,000 Is Allocated Towards The Additional Work Allowance
Closing Date10 Jan 2025
Tender AmountRefer Documents 

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION USA Tender

Software and IT Solutions
Corrigendum : Closing Date Modified
United States
Details: This Is Modification 12 To The Synopsis Entitled Mission Technical Integration Contract (mtic), 80jsc024mtic, Which Was Originally Posted On May 16, 2024. You Are Notified That The Following Changes Are Made: part Three, Four, Five, And Six Of The Mtic Technical Library Are Added To The List Of Attachments. the Due Date For The Submission Of Comments Regarding The Draft Request For Proposal (drfp) Is Extended To January 7, 2025, At 5:00 P.m Central Standard Time. this Is Not A Request For Proposal. No Proposals Are To Be Submitted In Response To This Notice. to Request Access To The Mtic Technical Library, You Must Provide A Completed “mtic Technical Library Request Form” Via Email To Jsc-mtic@mail.nasa.gov. When Responding Reference 80jsc024mtic Mtic-technical Library In The Subject Line. please Note That After The Request Form Is Submitted, You Must Have A Log In For Sam.gov. Once Logged In, Click The Request Access Button In The Attachments/links Section Of The Announcement. all Foreign Nationals From Designated Countries Covered By A Programmatic Technology Transfer Control Plan (pttcp) Or Requiring Access To Export Controlled Information Are Required To Have An Individual Technology Transfer Control Plan (i-ttcp) With A Non-disclosure Agreement (nda). Foreign Nationals From Non-designated Countries Requiring Access To Export-controlled Information Covered By A P-ttcp Are Required To Comply With The International Partner Or Foreign National Certification Contained In The P-ttcp. it Is The Offeror's Responsibility To Monitor This Website For The Release Of The Solicitation And Amendments (if Any). Potential Offerors Will Be Responsible For Downloading Their Own Copy Of The Solicitation And Amendments (if Any). all Questions Should Be Directed To The Points Of Contact Identified Below. Interested Parties Are Responsible For Monitoring This Website For Information Related To This Acquisition. --- End Of Modification 12 --- this Is Modification 11 To The Synopsis Entitled Mission Technical Integration Contract (mtic), 80jsc024mtic, Which Was Originally Posted On May 16, 2024. You Are Notified That The Following Changes Are Made: the Following Applicable Document Is Added To The Attachment Section Of This Posting: draft Request For Proposal 80jsc024mtic L-10 Zip Folder this Is Not A Request For Proposal. No Proposals Are To Be Submitted In Response To This Notice. it Is The Offeror's Responsibility To Monitor This Website For The Release Of The Solicitation And Amendments (if Any). Potential Offerors Will Be Responsible For Downloading Their Own Copy Of The Solicitation And Amendments (if Any). all Questions Should Be Directed To The Points Of Contact Identified Below. Interested Parties Are Responsible For Monitoring This Website For Information Related To This Acquisition. --- End Of Modification 11 --- this Is Modification 10 To The Synopsis Entitled Mission Technical Integration Contract (mtic), 80jsc024mtic, Which Was Originally Posted On May 16, 2024. You Are Notified That The Following Changes Are Made: the Draft Request For Proposal And Applicable Documents Are Hereby Posted In The Attachment Section Of This Posting. The Draft Rfp 80jsc024mtic Zip Folder Includes The Following: mtic Draft Request For Proposal (drfp) Cover Letter mtic Drfp 80jsc025r7002 l-3 Past Performance Relevancy Matrix l-5 Technical Resources Template l-6a Mtic Cost Price Template l-6b Minor Subcontracting Template l-7 Mtic Tcp Rate Build-up Form l-8 Prime Subcontractor Identification And Sow Division Of Work Listing Worksheet l-9 Pre-award Survey Of Prospective Contractor Accounting System Checklist attachment J-12 Iagp And Gfp attachment J-13 Gf Sw, It Sys, & Models, Contractor Hosted And Sustained Apps, And Licenses attachment J-17 Dd 254, Contract Security Classification Specification attachment J-18 Department Of Labor Wage Determination attachment J-19 Managed Documents mtic Template For Submission Of Comments Is Posted In The Attachment Section Of This Posting. contracting Officer Point Of Contact Updated. this Is Not A Request For Proposal. No Proposals Are To Be Submitted In Response To This Notice. this Notice Is Issued By The Nasa/jsc To Post A Draft Rfp To Solicit Responses From Interested Parties. This Document Is For Information And Planning Purposes And To Allow Industry The Opportunity To Verify Reasonableness And Feasibility Of The Requirement, As Well As Promote Competition. nasa Clause 1852.215-84, Ombudsman, Is Applicable. The Center Ombudsman For This Acquisition Can Be Found At Https://www.hq.nasa.gov/office/procurement/regs/procurement-ombuds-comp-advocate-listing.pdf. this Draft Rfp Is Not To Be Construed As A Commitment By The Government, Nor Will The Government Pay For The Information Submitted In Response. The Government May Not Respond To Questions/concerns Submitted. The Government Will Use The Information To Finalize The Rfp As Necessary. all Comments Or Questions Regarding The Draft Rfp Shall Be Submitted Electronically Utilizing The “mtic Template For Submission Of Comments” Via Email To Jsc-mtic@mail.nasa.gov, No Later Than January 3, 2025, At 5:00 P.m. Central Standard Time. When Responding Reference 80jsc025r7002 Mtic-drfp. if A Solicitation Is Released, Then It And Any Additional Documents Will Be Available On Www.sam.gov. It Is The Offeror's Responsibility To Monitor This Website For The Release Of The Solicitation And Amendments (if Any). Potential Offerors Will Be Responsible For Downloading Their Own Copy Of The Solicitation And Amendments, If Any. it Is The Offeror's Responsibility To Monitor This Website For The Release Of The Solicitation And Amendments (if Any). Potential Offerors Will Be Responsible For Downloading Their Own Copy Of The Solicitation And Amendments (if Any). nasa Intends To Publicize A Listing Of Respondents In Order To Facilitate Teaming Arrangements. Should Your Firm Desire Not To Be Included In This Listing, Clearly Indicate This Desire In Your Response. obtaining Access To Export Controlled Content: to Request Access To The Mtic Technical Library, Please Complete The Technical Library Request Form In The "attachments" Section Below. Once The Technical Library Request Form Is Submitted Through E-mail To Jsc-mtic@mail.nasa.gov, Please Request Access To All Mtic Technical Library Zip Folders In The "attachments" Section In Sam.gov. If Approved, You Will Be Granted Access To All Mtic Technical Library Zip Documents. please Note That After Submitting The Technical Library Request Form, You Must Have A Log In For Sam.gov. Once Logged In, Click The Request Access Button In The Attachments/links Section Of The Announcement. all Questions Should Be Directed To The Points Of Contact Identified Below. Interested Parties Are Responsible For Monitoring This Website For Information Related To This Acquisition. --- End Of Modification 10 --- this Is Modification 9 To The Synopsis Entitled Mission Technical Integration Contract (mtic), 80jsc024mtic, Which Was Originally Posted On May 16, 2024. You Are Notified That The Following Changes Are Made:part One And Two Of The Technical Library Are Available And The Following Documents Are Added To The List Of Attachments: mtic Industry Update Charts mtic Requirements Points Of Contacts mtic Industry Update Interested Parties List mtic Industry Update Questions And Answers mtic Technical Library Reference Document Part One And Two mtic Technical Library Part One mtic Technical Library Part Two mtic Technical Library Request Form to Request Access To The Mtic Technical Library, You Must Provide A Completed “mtic Technical Library Request Form” Via Email To Jsc-mtic@mail.nasa.gov. When Responding Reference 80jsc024mtic Mtic-technical Library In The Subject Line. please Note That After The Request Form Is Submitted, You Must Have A Log In For Sam.gov. Once Logged In, Click The Request Access Button In The Attachments/links Section Of The Announcement. all Foreign Nationals From Designated Countries Covered By A Programmatic Technology Transfer Control Plan (pttcp) Or Requiring Access To Export Controlled Information Are Required To Have An Individual Technology Transfer Control Plan (i-ttcp) With A Non-disclosure Agreement (nda). Foreign Nationals From Non-designated Countries Requiring Access To Export-controlled Information Covered By A P-ttcp Are Required To Comply With The International Partner Or Foreign National Certification Contained In The P-ttcp. all Questions Should Be Directed To The Points Of Contact Identified Below. Interested Parties Are Responsible For Monitoring This Website For Information Related To This Acquisition. --- End Of Modification 9 --- this Is Modification 8 To The Synopsis Entitled Mission Technical Integration Contract (mtic), 80jsc024mtic, Which Was Originally Posted On May 16, 2024. You Are Notified That The Following Changes Are Made: to Facilitate Open Communication With Industry, Nasa Johnson Space Center (jsc) Plans To Conduct An Industry Update For Mtic. The Presentation Date Has Changed From Thursday, September 5, 2024, At 9:00am To 11:00am Central Standard Time (cst) To Friday, September 6, 2024, At 9:00am To 11:00am Central Standard Time (cst). please Rsvp For Industry Update Via Email At Jsc-mtic@mail.nasa.gov By 12:00pm Cst On Thursday, September 5, 2024. A Microsoft Teams Meeting Notice Will Be Provided For Those Who Rsvp To This Announcement. All Previous Rsvps Are Still Valid. Attendance Information Should Include The Following: company Name point Of Contact Name point Of Contact Email business Size please Email Any Questions To Eric S. Festa At Jsc-mtic@mail.nasa.gov. The Government Will Officially Respond To All Questions By Posting Responses To Sam.gov And The Mtic Website After The Industry Update Event. all Questions Should Be Directed To The Points Of Contact Identified Below. Interested Parties Are Responsible For Monitoring This Website For Information Related To This Acquisition. --- End Of Modification 8 --- this Is Modification 7 To The Synopsis Entitled Mission Technical Integration Contract (mtic), 80jsc024mtic, Which Was Originally Posted On May 16, 2024. You Are Notified That The Following Changes Are Made: to Facilitate Open Communication With Industry, Nasa Johnson Space Center (jsc) Plans To Conduct An Industry Update For Mtic. The Presentation Will Be Held On Thursday, September 5, 2024, At 9:00am To 11:00am Central Standard Time (cst). The Industry Update Will Be Conducted Virtually Via Teams. please Rsvp For Industry Update Via Email At Jsc-mtic@mail.nasa.gov By 12:00pm Cst On Wednesday, September 4, 2024. A Microsoft Teams Meeting Notice Will Be Provided For Those Who Rsvp To This Announcement. Attendance Information Should Include The Following: company Name point Of Contact Name point Of Contact Email business Size please Email Any Questions To Eric S. Festa At Jsc-mtic@mail.nasa.gov. The Government Will Officially Respond To All Questions By Posting Responses To Sam.gov And The Mtic Website After The Industry Update Event. all Questions Should Be Directed To The Points Of Contact Identified Below. Interested Parties Are Responsible For Monitoring This Website For Information Related To This Acquisition. --- End Of Modification 7 --- this Is Modification 6 To The Synopsis Entitled Mission Technical Integration Contract (mtic), 80jsc024mtic, Which Was Originally Posted On May 16, 2024. You Are Notified That The Following Changes Are Made:the “mtic Industry Day Questions And Answers” Is Added To The List Of Attachments. all Questions Should Be Directed To The Points Of Contact Identified Below. Interested Parties Are Responsible For Monitoring This Website For Information Related To This Acquisition. --- End Of Modification 6 --- this Is Modification 5 To The Synopsis Entitled Mission Technical Integration Contract (mtic), 80jsc024mtic, Which Was Originally Posted On May 16, 2024. You Are Notified That The Following Changes Are Made:the “mtic Interested Parties List” Is Added To The List Of Attachments. all Questions Should Be Directed To The Points Of Contact Identified Below. Interested Parties Are Responsible For Monitoring This Website For Information Related To This Acquisition. --- End Of Modification 5 --- this Is Modification 4 To The Synopsis Entitled Mission Technical Integration Contract (mtic), 80jsc024mtic, Which Was Originally Posted On May 16, 2024. You Are Notified That The Following Changes Are Made:the “mtic Industry Day Charts” Are Added To The List Of Attachments. all Questions Should Be Directed To The Points Of Contact Identified Below. Interested Parties Are Responsible For Monitoring This Website For Information Related To This Acquisition. --- End Of Modification 4 --- modification 3 this Is Modification 3 To The Rfi Entitledmission Technical Integration Contract (mtic), 80jsc024mtic, Which Was Originally Posted On May 16, 2024. You Are Notified That The Following Changes Are Made: 1. The Following Location Has Been Added For An In-person Industry Day Option. industry Day Will Be Held In A Hybrid Format. The In-person Option For Industry Day Will Be At The Following Location: gilruth Conference Center lone Star Room johnson Space Center (jsc) 2101 E Nasa Pkwy, Houston, Tx 77058 2. Corrected The Secondary Point Of Contact Email From Jsc-mitc@mail.nasa.gov To Jsc-mtic@mail.nasa.gov. the Due Date For Responses Is Not Extended. offerors Are Responsible For Monitoring This Site For The Release Of The Solicitation And Any Amendments. Potential Offerors Are Responsible For Downloading Their Own Copy Of The Solicitation And Amendments (if Any). --- End Of Modification 3 --- modification 2 - May 22, 2024 this Is Modification 2 To The Rfi Entitledmission Technical Integration Contract (mtic), 80jsc024mtic, Which Was Posted On May 16, 2024. You Are Notified That The Following Changes Are Made: added Clarifying Language Regarding The Page Count Limitations. Additionally, Added The Industry Day Announcement.corrected Spelling Errors In Modification 1. the Due Date For Responses Is Not Extended. offerors Are Responsible For Monitoring This Site For The Release Of The Solicitation And Any Amendments. Potential Offerors Are Responsible For Downloading Their Own Copy Of The Solicitation And Amendments (if Any). --- End Of Modification 2 --- modification 1 - May 20, 2024 this Is Modification1 To The Rfi Entitledmission Technical Integration Contract (mtic), 80jsc024mtic, Which Was Posted On May 16, 2024. You Are Notified That The Following Changes Are Made: changed The Email Inbox Address From Jsc-mtic@nasa.gov To Jsc-mtic@mail.nasa.gov. the Due Date For Responses Is Not Extended. offerors Are Responsible For Monitoring This Site For The Release Of The Solicitation And Any Amendments. Potential Offerors Are Responsible For Downloading Their Own Copy Of The Solicitation And Amendments (if Any). --- End Of Modification 1 --- background the National Aeronautics And Space Administration (nasa) Lyndon B. Johnson Space Center (jsc) Is Hereby Soliciting Information From Potential Sources For The Mission Technical Integration Contract (mtic). Mtic Is The Follow-on Acquisition For The Human Space Flight Technical Integration Contract (hsftic). See Enclosed “historical Scope Of Work” For Detailed Requirements. current Contractor: Barrios Technology, Ltd.; contract Number: 80jsc020c0017; estimated Contract Value: Approximately $337 Million; contract Expiration Date: September 30, 2025 the Government Does Not Intend To Acquire A Commercial Item Using Far Part 12. the Naics Code And Size Standard Are 541715 And 1,000 Employees, Respectively. information Requested nasa Jsc Is Seeking Capability Statements From All Interested Parties, Including All Socioeconomic Categories Of Small Businesses And Historically Black Colleges And Universities (hbcu)/minority Institutions (mi), And Members Of The Underserved Communities As Defined By Executive Order 13985, Advancing Racial Equity And Support For Underserved Communities Through The Federal Government, For The Purposes Of Determining The Appropriate Level Of Competition And/or Small Business Subcontracting Goals For Mtic. The Government Reserves The Right To Consider A Small, 8(a), Women-owned (wosb), Service Disabled Veteran (sd-vosb), Economically Disadvantaged Women-owned Small Business (edwosb) Or Hubzone Business Set-aside Based On Responses Received. additionally, In Support Of The Executive Order (eo) 13985, Advancing Racial Equity And Support For Underserved Communities Through The Federal Government, Nasa Is Seeking To Advance Equity Or Remove Barriers For Members Of Underserved Communities Related To This Requirement. As Defined In The Eo, Underserved Communities Refers To Populations Sharing A Particular Characteristic, As Well As Geographic Communities, That Have Been Systematically Denied A Full Opportunity To Participate In Aspects Of Economic, Social, And Civic Life, As Exemplified By The List In The Preceding Definition Of "equity." Equity Means The Consistent And Systematic Fair, Just, And Impartial Treatment Of All Individuals, Including Individuals Who Belong To Underserved Communities That Have Been Denied Such Treatment, Such As Black, Latino, And Indigenous And Native American Persons, Asian Americans And Pacific Islanders And Other Persons Of Color; Members Of Religious Minorities; Lesbian, Gay, Bisexual, Transgender, And Queer (lgbtq+) Persons; Persons With Disabilities; Persons Who Live In Rural Areas; And Persons Otherwise Adversely Affected By Persistent Poverty Or Inequality. the Following Requested Inputs Are Limited To No More Than Five Pages Total For Inputs One And Two. Inputs Three Through Six And Responses To The Oci Request Are Unlimited. interested Firms Having The Required Capabilities Necessary To Meet The Following Requirements Described Herein Should Submit A Capability Statement Of No More Than Five Pages Indicating The Ability To Perform All Aspects Of The Effort. Mtic Will Provide Program Management Business Management, Configuration Management And Data Management, Information Technology, Systems Engineering And Integration, Mission Integration, Operations, Safety And Mission Assurance/program Risk, And Program Research And Communication Support Services. Please See The Enclosed Document Entitled “historical Scope Of Work” To Determine Your Ability To Perform All Aspects Of This Effort.[cok(b1] in Addition To The Information Requested Above, Interested Parties May Also Provide Optional Comments On This Potential Acquisition Regarding Contract Type, Structure, Incentive Arrangements, Evaluation Criteria, Or Performance Metrics. to Support The Requirements Identified In This Request For Information (rfi)/sources Sought Notification, What Barriers Or Opportunities Exist To Engage Subject Matter Experts From Industry And Academia And How Can Those Barriers Be Overcome? How Can Underserved Communities Be Leveraged? to Support The Requirements Identified In This Rfi, What Barriers Or Opportunities Exist To Partner With Subcontractors That Employ Members Of Underserved Communities, As Defined Above? what Other Recommendations Would You Make To Enhance Diversity And Inclusion? what Should Be Considered To Encourage Full Participation And Contribution Of Organizations And Individuals (e.g., Outreach Efforts And Innovative Partnerships) In Performance Of This Requirement? organizational Conflicts Of Interest (oci): nasa/jsc Is Requesting Information From Industry Regarding Potential Organizational Conflicts Of Interest (oci) Arising From Mtic. the Nature Of The Work Anticipated Under Mtic May Create The Potential For Oci(s) As Currently Described In Far Subpart 9.5. Each Interested Party Should Review Far Subpart 9.5 In Light Of Nasa’s Anticipation Of Oci Issues And Consider Carefully The Extent To Which An Oci May Arise Before Making The Decision To Compete For The Mission Technical Integration Contract. nasa Seeks Input In The Following Areas. Interested Parties Are Requested To Address The Following Questions: 1. What Type(s) Of Oci Issues Would Your Company Or Potential Team Identify, If Any, Should You Choose To Propose On The Mission Technical Integration Contract? 2. What Strategies Would You Anticipate Proposing To Mitigate The Oci Issues That You Identified (if Any)? Please Provide Strategy Details, Previous Examples/experience With Other Contracts With Nasa Or Other Agencies, Etc. 3. Are There Any Other Types Of Potential Oci Issues With The Proposed Mtic Contract That Were Not Identified In This Rfi (assuming Any Were Identified)? 4. Does Your Company Foresee Any Oci Issues Associated With The Mtic Contract That Would Cause You To Decide Not To Propose On The Potential Mission Technical Integration Contract Rfp? nasa Will Review Any Responses Received Regarding Potential Oci And Each Offeror’s Proposed Oci Mitigation Strategy. Nasa Will Respond To Each Company Who Submits A Mitigation Strategy. Nasa’s Response Is Not Intended To Serve As A Confirmation That, In Fact, All Potential Oci Have Been Identified, An Oci Will Ultimately Exist, Or That An Interested Party Is Capable Of Successfully Eliminating Or Mitigating An Identified Oci. Nasa’s Response Is Also Not Intended To Encourage Or Discourage Any Interested Party From Responding To An Rfp Issued For Mission Technical Integration Contract In The Future. Furthermore, Nasa’s Response In No Way Alters Or Interprets Far 9.5 As It Applies To A Final Statement Of Work Or A Final Proposal Submission, Should An Interest Party Elect To Submit A Proposal To An Rfp For Mission Technical Integration Contract. Subsequent To The Initial Oci Submission And Nasa’s Response, Nasa Will Not Consider Further Information As It Relates To This Rfi. submission Instructions: all Questions Should Be Directed To The Point Of Contact Identified Below. In Accordance With Far 15.201(e), Responses To This Notice Are Not Offers And Cannot Be Accepted By Nasa To Form A Binding Contract. Nasa Is Under No Obligation To Issue A Solicitation Or To Award Any Contract On The Basis Of This Rfi. Nasa Will Not Pay For Any Information Solicited Under This Rfi. No Solicitation Exists; Therefore, Do Not Request A Copy Of A Solicitation. If A Solicitation Is Released It Will Be Synopsized On Sam.gov. It Is The Interested Party’s Responsibility To Monitor This Website For The Release Of Any Subsequent Solicitation Or Synopsis. all Responses Shall Be Submitted Electronically Via Email To Eric S. Festa At Jsc-mtic@mail.nasa.gov No Later Than 12:00pm, Central Time Zone On June 17th, 2024. Please Reference Mission Technical Integration Contract In Any Response. point Of Contact name: Eric S. Festa title: Contract Specialist email: Jsc-mtic@mail.nasa.gov the Documents On The Nasa Mtic Acquisition Website ( Https://www.nasa.gov/johnson/jsc-procurement/mtic/)are For Information And Planning Purposes, To Allow Industry The Opportunity To Comment, And To Promote Competition Only. Nasa Will Not Affirmatively Release Any Information Received In Response To This Rfi To The Public, But May Use Information Received In Developing The Best Approach For A Contract Strategy, And Therefore Such Information May Be Recognizable To The Interested Party Who Submitted It. Any Information Submitted In Response To This Rfi That Is Marked As “confidential Commercial Or Financial Information” Will Be Considered As Voluntarily Submitted In Accordance With The Freedom Of Information Act. nasa Intends To Publicize A Listing Of Respondents In Order To Facilitate Teaming Arrangements. Should Your Firm Desire Not To Be Included In This Listing, Clearly Indicate This Desire In Your Response. nasa Clause 1852.215-84, Ombudsman, Is Applicable. The Center Ombudsman For This Acquisition Can Be Found At : Https://www.hq.nasa.gov/office/procurement/regs/procurement-ombuds-comp-advocate-listing.pdf industry Day: to Facilitate Open Communication With Industry, Nasa Johnson Space Center (jsc) Plans To Conduct An Industry Day For Mtic. The Presentation For Industry Day Will Be Held Ontuesday, June 18, 2024, At 9:00am To 11:00am Central Standard Time (cst). Industry Day Will Be Held Either Virtually Or Hybrid. A Location Will Be Provided In A Future Modification To This Announcement If An In Person Option Is Available. a Microsoft Teams Meeting Notice Will Be Provided For Those Who Rsvp To This Announcement. the Government Will Also Provide One-on-one Communication Opportunities In Person Or Virtually Ontuesday, June 18, 2024 Between 1:00pm And 5:00pm Cstandvirtually On Thursday, June 20, 2024, Between 9:00am And 1:00pm Cst. One-on-one Meetings Will Be Held In The Gilruth Conference Center Or Via Teams And Will Not Exceed 20 Minutes. Participation Is Limited To Five (5) Individuals From Each Company/team. please Rsvp For Industry Day Via Email At Jsc-mtic@mail.nasa.gov By4:00pm Cst Onfriday, June 14, 2024. Attendance Information Should Include Company Name, Name/representative, And Point Of Contact Information. Please Indicate If You Prefer To Attend In Person Or Via Teams. please Email Any Questions To Eric S. Festa At Jsc-mtic@mail.nasa.gov. The Government Will Officially Respond To All Questions By Posting Responses To Sam.gov And The Mtic Website After Industry Day. one-on-one Meetings to Facilitate Interactive Communications With Industry, Jsc Personnel Will Also Be Available For Meetings With Individual Companies In Conjunction With Industry Day. The Meetings Are Intended To Be Q&a Sessions In Which Neither Side Will Make A Formal Presentation. To Request A One-on-one Meeting, Please Respond Affirmatively In Your Rsvp Per The Instructions Above. the Following Topics May Be Discussed At The One-on-one Meetings: the General Purpose Of The Announced Procurement; any Information About The Mtic Acquisition That Nasa Has Already Made Accessible To The Public Or Is Otherwise Being Made Available To All Potential Offerors; historical Information About The General Nature Or Scope Of Prior Contracts Whose Requirements Will Be Addressed In Whole Or In Part Under A Follow-on Procurement; information That Describes The Federal Procurement Process As Defined By The Federal Acquisition Regulation (far), Nasa Far Supplement (nfs), Or Other Published Procurement Policy Documents; And procurement Specific Information Already Published Such As Information Contained In The Historical Scope Of Work And Sources Sought Synopsis. questions Regarding The Subjects Belowwill Notbe Discussed: proprietary Or Confidential Business Information Of Incumbent Contractor(s) Or Other Business Entities; privacy Act Protected Information Such As, Incumbent Contractor Employees’ Personal Data; trade Secrets Act Protected Information; speculation On What The Government Might Be Looking For In Proposals; different Technical And Management Approaches; technical Efficiencies; any Particular Government Emphasis; And incumbent’s Performance. a Confirmation Email Will Be Sent To Acknowledge Your Reservation(s) And Provide Further Instructions. no Recordings Of Any Kind Are Permitted Of The Industry Day Presentation Or One-on-one Sessions. nasa Anticipates Releasing The Industry Day Charts Prior To Industry Day. Offerors Are Responsible For Monitoring This Site For The Release Of The Solicitation And Any Amendments. Potential Offerors Are Responsible For Downloading Their Own Copy Of The Solicitation And Amendments (if Any).
Closing Date7 Jan 2025
Tender AmountRefer Documents 

STATE, DEPARTMENT OF USA Tender

Others
United States
Details: U.s. Department Of State bureau Of International Narcotics And Law Enforcement Affairs (inl) you Have Received This "personal Services Contractor” (psc) Solicitation Through The Department Of State (dos) Internet Site. If You Have Any Questions Regarding This Psc, You May Contact The Dos Official Named In This Solicitation. The Department Is Not Responsible For Any Data And/or Text Not Received When Retrieving This Document Electronically. Amendments To Solicitation Documents Generally Contain Information Critical To The Submission Of An Application. position Title: Design, Monitoring And Evaluation (dme) Project Advisor location: Mexico City, Mexico salary Level: Fs-02 - $101,395 - $148,902 (equivalent Gs-14) period Of Performance: The Period Of Performance For This Contract Is Twelve (12) Months From The Date Of Award With Four (4) Optional One-year Extensions. issuance Date: January 13, 2025 closing Date: January 24, 2025 closing Time: 3:00 Pm Et solicitation Number: Psc-25-014-inl job Description: See Below dear Prospective Offerors: the Department Of State Is Seeking Offers From Qualified U.s. Citizens To Provide Personal Services For The Subject Position Under A Personal Services Contract, As Described In This Solicitation. Submittals Must Be In Accordance With The Attached Information At The Place And Time Specified. Applicants Interested In Applying For This Position Must Submit The Following Materials: 1. Form Sf 171 (completed And Signed) 2. Complete Resume. In Order To Fully Evaluate Your Offer Your Resume Must Include: a. Paid A Non-paid Experience, Job Title, Location(s), Dates Held (month/year), And Hours Worked Per Week For Each Position. Dates (month/year) And Locations For Any Overseas Experience Must Also Be Detailed. Any Experience That Does Not Include Dates (month/year), Locations, And Hours Per Week Will Not Be Counted Towards Meeting The Solicitation Requirements. b. Specific Duties Performed That Fully Detail The Level And Complexity Of The Work. c. Names And Contact Information (phone And Email) Of Your Current And/or Previous Supervisor(s). d. Education And Any Other Qualifications Including Job-related Training Courses, Job-related Skills, Or Job-related Honors, Awards Or Accomplishments. e. U.s. Citizenship note: Resume Must Contain Explicit Information To Make A Valid Determination That The Candidate Meets The Experience Requirements As Stated In This Solicitation. This Information Needs To Be Clearly Identified In The Resume. Failure To Provide Explicit Information To Determine Qualifications For The Position Will Result In Loss Of Full Consideration. 3. Evaluation Factor Document Specifically Addressing: Each Of The Evaluation Factors Shown In The Solicitation Below. Responses Must Be Limited To 500 Words Per Evaluation Factor. Any Additional Words Above The Limit Will Neither Be Read Nor Scored. note: The Evaluation Factors Are Worth 70 Out Of 100 Points. Offerors Are Required To Address Each Of The Evaluation Factors In A Separate Document Describing Specifically And Accurately What Experience, Training, Education And/or Awards They Have Receive That Are Relevant To Each Factor. 4. Professional References: Three (3) Names And Contact Information (phone And Email) Of Current And/or Previous Supervisors To Serve As Professional References. additional Documents Submitted Will Not Be Accepted. Incomplete Or Late Offers Will Not Be Considered. Complete Applications Must Be Emailed To: dominique Chittum, U.s. Department Of State, Inl/ex/gapp, Chittumda@state.gov sincerely, margaret Renee Gaudreau contracting Officer, U.s. Department Of State subject a Solicitation For A Personal Services Contractor (psc), Department Of State (dos), Bureau For International Narcotics And Law Enforcement Affairs (inl). the United States Government (usg), Represented By The Dos, Seeks Applications From Us Citizens Interested In Providing Psc Services As Described In This Solicitation. pre-award Ethical Responsibilities Of Psc (jun 2011) this Solicitation May Result In The Award Of One Or More Personal Services Contracts As Defined In Far 2.101. Prior To Contract Award, All Offerors Or Quotes Must Advise The Cognizant Contracting Officer If They Have A Personal Conflict Of Interest, Such As A Financial Conflict, That Would Prevent Them From Either Meeting The Requirements Of The Clause Entitled, “post-award Ethical Responsibilities Of Personal Services Contractors,” Or Otherwise Objectively Performing Their Contractual Duties Upon Contract Award. how To Apply offerors Proposal Shall Be In Accordance With The Requirements Stated In This Solicitation At The Place And Time Specified. A Proposal Will Be Determined Non-responsive And Ineligible For Consideration Unless All Required Documents And Information Are Included In The Submission. Offerors Shall Ensure Their Resume Demonstrates Their Possession Of The Minimum Qualifications Outlined In This Solicitation, As Well As Their Ability To Fulfill All Required Duties. The Government Is Not Responsible For Any Costs Incurred By The Offeror During The Solicitation Process. note Regarding Government Obligations For This Solicitation this Solicitation In No Way Obligates The Department Of State To Award A Psc Contract, Nor Does It Commit The Department Of State To Pay Any Cost Incurred In The Preparation And Submission Of The Application. proposals Must Include The Following And Not Exceed Twenty (20) Pages (additional Pages Will Not Be Accepted Or Reviewed): 1. Form Sf 171 (completed And Signed) 2. Resume 3. Evaluation Factor Responses 4. Three (3) Names And Contact Information (phone And Email) Of Current And/or Previous Supervisors To Serve As Professional References. note: Your Resume Should Contain Explicit Information To Make A Valid Determination That You Fully Meet The Experience Requirements As Stated In This Solicitation. This Information Should Be Clearly Identified In Your Resume. Failure To Provide Explicit Information To Determine Your Qualifications For The Position Will Result In Loss Of Full Consideration. Additional Documents Submitted Beyond The Requirements Will Not Be Accepted Or Reviewed. *** One Pdf Attachment Is Highly Recommended veteran’s Preference veteran’s Preference Is Not Applicable To This Position Therefore Do Not Submit Dd-214. all Qualified Applicants Will Be Considered Regardless Of Age, Race, Color, Sex, Creed, National Origin, Lawful Political Affiliation, Nondisqualifying Disability, Marital Status, Sexual Orientation, Affiliation With An Employee Organization, Or Other Non-merit Factor. equal Employment Opportunity Policy - The United States Government Does Not Discriminate In Employment On The Basis Of Race, Color, Religion, Sex (including Pregnancy And Gender Identity), National Origin, Political Affiliation, Sexual Orientation, Marital Status, Disability, Genetic Information, Age, Membership In An Employee Organization, Retaliation, Parental Status, Military Service Or Other Non-merit Factor. submit Proposal Via E-mail To The Attention Of: inl/dominique Chittum e-mail: Chittumda@state.gov direct Questions Regarding This Solicitation To: inl/dominique Chittum e-mail: Chittumda@state.gov inl Will Not Accept Proposals Beyond The Closing Time/date; Unless It Can Be Determined Dos Mishandled The Proposal. general Statement Of The Purpose Of This Contract mission Of The U.s. Department Of State: The U.s. Department Of State Is The Lead Institution For The Conduct Of American Diplomacy And The Secretary Of State Is The President’s Principal Foreign Policy Advisor. The Department Of State’s Mission Is To Advance U.s. National Security Interests, Fight Terrorism, Protect U.s. Interests Abroad, And Implement Foreign Policy Initiatives That Build A Freer, Prosperous, And Secure World. mission Of The Bureau Of International Narcotics And Law Enforcement Affairs Inl): Inl Is Under The Under Secretary For Democracy And Human Rights (j) And Works To Keep Americans Safe At Home By Countering International Crime, Illegal Drugs, And Instability Abroad. Inl Helps Countries Deliver Justice And Fairness By Strengthening Their Police, Courts, And Corrections Systems. These Efforts Reduce The Amount Of Crime And Illegal Drugs Reaching U.s. Shores. this Position Is Located In The Inl Section Of The U.s. Embassy In Mexico City. The Purpose Of This Personal Services Contract (psc) Is To Provide Strategic Guidance, Management, And Technical Support To Ensure The Successful Planning, Implementation, Monitoring, And Evaluation Of Inl Mexico Projects And Measure Them Against Overarching Inl Goals. This Role Will Integrate Design And Evaluation Expertise With Project Management Skills To Enhance Project Effectiveness, Efficiency, And Impact. The Position Will Report To The Us Direct Hire Foreign Service Officer Policy Unit Chief And Work Closely With Project Teams, Stakeholders, And Partners To Ensure The Successful Delivery Of Project Objectives. The Psc Will Oversee And Mentor The Design, Monitoring, And Evaluation Specialists, And Lead The Design And Implementation Of Policies, Processes, And Guidance On Project And Program Dme Such That Inl-mexico Foreign Assistance Projects And Programs Are Maximally Effective And Meet Inl Dme Requirements. duties & Responsibilities under The Direct Supervision Of The Policy Unit Chief Or His/her Designee, The Dme Project Advisor Will Perform The Following Duties: 1. Provide Direction, Oversight, And Supervision Of Dme Staff (consisting Of Up To 5 Locally Employed Staff (le Staff), And 2 Third Party Contractors (tpcs) That Work On The Team As Monitoring And Evaluation Specialists), And Serve As The Direct Superior Of The One Le Staff M&e Supervisor. 2. Lead The Development Of Evaluations, Indicators, Surveys, And Learning Practices For Inl-mexico Projects And Programs And Goals. 3. Ensure Robust Project Management Practices Throughout The Project Lifecycle. 4. Design And Update Policies, Processes, And Systems For Effective Project And Program Review. 5. Collaborate With Inl-mexico Staff And Leadership To Gain Support For Dme Processes. 6. Design And Maintain Systems For Accurate And Efficient Reporting To Meet Standard And Ad-hoc Requirements. 7. Support Project Proposal Development, Including Needs Assessments, Theory Of Change, And Logical Frameworks. 8. Ensure Alignment Of Project Goals With Organizational And Department Priorities. 9. Assist Implementing Partners In Reporting Valid And Useful Information In Inl’s Systems Of Record. 10. Analyze And Report On Project Data To Recommend Performance Improvements. 11. Develop Relationships With Government Of Mexico Officials And Provide Technical Assistance To Improve Data Capacity. 12. Prepare And Present Reports On Indicator Performance And Findings To Stakeholders. 13. Review And Assess Monitoring Approaches, Indicators, And Evaluation Methods In Project Applications. 14. Serve As A Liaison To Dme Teams In Other Inl Overseas Sections And In Washington. 15. Conduct And Document Program And Project Level Reviews And Identify Needs For Course Correction. 16. Serve As Contracting Officer’s Representative (cor) On Dme Related Contracts (i.e. Field Research, Project Level Studies). 17. Coordinate Site Visits For Data Quality Assessments Of Implementing Partners/organizations. 18. Serve As A Key Interlocutor Between The Dme Team And Inl Program Teams, Ensuring Adherence To Dme Requirements. 19. When Required, Perform The Role Of Duty Officer. 20. Perform Other Duties As Requested And Assigned That Are Directly Related To This Statement Of Work. trainings & Distance Learning Courses 1. Completes All On-line Training Mandated By The Department Of State (e.g., Ct401 (counter Threat Awareness Training), Ethics) Within 120 Days Of Contract Start Date. 2. Completes The Mandatory Foreign Affairs Counter-threat (fact) Course (ct650) Prior To Deployment To Post. 3. Completes The Introduction To Working In An Embassy (pn113) Distance-learning (dl) Course Through The Foreign Service Institute (fsi) Within The First Six (6) Months Of Arriving At Post. 4. Completes The Inl Pre-deployment Program (prep) Course Prior To Deployment To Post (unless Waived By The Inl Director Due To The Incumbent’s Past Experience Or Timing). place Of Performance & Travel Requirements the Place Of Performance For This Position Is Us Embassy Mexico City, Mexico. Travel Up To 25 Percent Of The Time To Regional Security Office (rso) Authorized Locations In Mexico, The United States, And Occasionally The Region Will Be Required. relationships the Dme Project Advisor Will Serve Under The Day-to-day Direction Of The Policy Unit Chief In Inl-mexico. This Position Supervises The Dme Team, Which Is Currently Five Le Staff. the Contract Administrator Shall Be The Inl Contracting Officer In Washington. In No Instance Shall The Policy Unit Chief Or Any Other Individual Be Authorized To Alter Or Modify The Terms And Conditions Of The Contract Or Waive The Government's Requirements, Price, Delivery, Or Other Terms And Conditions. The Contracting Officer Must Authorize Such Changes In Writing. the Policy Unit Chief Will Provide Yearly Performance Reviews To The Inl/ex/gapp Contracting Officer In Washington, D.c. To Contribute To The Incumbent’s Official Yearly Review. complexity this Position Involves Managing And Providing Dme Technical Expertise For A Wide Portfolio Of Programs And Projects In Inl-mexico Simultaneously. The Ability To Perform Complex Analysis, Explain Dme Concepts Clearly And Concisely, Meet Short Deadlines, Coordinate Between Many Stakeholders, And Multi-task Successfully Is Essential. duties Are Significantly Varied And Require Many Different Unrelated Processes And Methods That Are Applied To A Broad Range Of Problems/situations That Require A Substantial Depth Of Analysis. Decisions That Must Be Made Involve Major Areas Of Uncertainty In Approach, Methodology, Interpretation And Evaluating Processes. There Are Continuing Changes In Programming, Dme Requirements, Partner Capacity For Dme, And Political Circumstances Enabling Or Restricting Programming And Dme Efforts. The Work Requires Developing New Techniques And Establishing Criteria. Incumbents Typically Identify And Develop Ways To Resolve Problems Or Cope With Issues Which Directly Affect The Ongoing Relationships With Partners And The Ability To Gather And Use Meaningful Results Data. scope & Effectiveness the Psc Performs Broad Range Of Tasks And Assignment Related To The Dme Of Inl’s Programs And Projects. Assignments For These Tasks May Often Be Self-generated And In Response To Broader Dme Needs, Requirements, And Efforts In Inl-mexico. Knowledge And Professional Experience Supporting Dme In International Development Contexts, Coupled With Subject Matter Familiarity With Inl’s Key Focus Areas, Is Necessary To Support The Results-based Management Of Inl-mexico’s Programming. An Effective Psc Will Also Contribute To Inl-mexico's And Inl’s Bureau-wide Culture Changes And Adoption Of Measures To Use Evidence And Data To Inform Policy And Programming. period Of Performance the Period Of Performance For This Contract Is Twelve (12) Months From The Date Of Award With Four (4) Optional One-year Extensions. minimum Qualifications 1. U.s. Citizenship With The Ability To Obtain And Maintain Department Of State Secret Level Security Clearance, Medical Clearance, And Ethics Clearance (if Applicable). (security Clearance Upgrade To Top Secret Level May Be Required.) 2. Bachelor’s Degree From An Accredited Institution And A Minimum Of Five (5) Years Of Experience In Relevant Fields: Performing Design, Monitoring And Evaluation Duties Related To Foreign Assistance Programs; Project Management And Identifying Business Needs And Determining Solutions To Problems Related To Improving Implementation Of Dme; Or, a. A Master’s Degree From An Accredited Institution And A Minimum Of Three (3) Years Of Experience In Relevant Fields: Performing Design, Monitoring And Evaluation Duties Related To Foreign Assistance Programs; Project Management And Identifying Business Needs And Determining Solutions To Problems Related To Improving Implementation Of Dme. 3. Active Project Management Professional (pmp) Certification Issued By The Project Management Institute (pmi). 4. A Minimum Of Two (2) Years Of Experience In A Supervisory Or Managerial Role, Leading And Managing A Team Of At Least Three Direct Reports. 5. Demonstrated Ability To Organize, Manage, And Present Complex Information In A Clear And Understandable Way. 6. Demonstrated Knowledge Of Monitoring And Evaluation Methodologies, Frameworks, And Best Practices. evaluation Criteria (used To Determine The Competitive Ranking Of Qualified Offerors In Comparison To Other Offerors.) Offerors Should Cite Specific, Illustrative Examples For Each Factor. Responses Must Be Limited To 500 Words Per Factor. Any Additional Words Above The Limit Will Neither Be Read Nor Scored. factor 1: Expertise In Design, Monitoring And Evaluation (20 Points) demonstrated Expertise In Designing, Monitoring, And Evaluating Complex International Programs To Achieve Policy Goals. Demonstrated Familiarity With Results-based Project And Program Management Approaches, Including Knowledge Of Two Or More Monitoring, Evaluation, And Learning Approaches And Terminology. Demonstrated Ability To Articulate Root-causes Of Target Problems, Logical Theories Of Change, Intended Short- And Long-term Results Of Projects, And Valid Signals Of Change (indicators). Demonstrated Experience Supporting The Utilization Of Evidence, Findings, And Recommendations From Monitoring And Evaluation Effort To Change A Project Course. Experience With Foreign Assistance Projects Is Preferred But Not Required. factor 2: Expertise In Project Management (20 Points) demonstrated Experience With Diverse Project Types And Different Phases Of The Project Lifecycle. Proven Ability To Develop Comprehensive Project Proposals, Including Logical Frameworks And Theories Of Change. Demonstrated Experience In Financial Management, Including Budget Planning, Monitoring, And Reporting. Proficiency In Identifying Potential Project Risks And Developing Mitigation Strategies. factor 3: Expertise In Business Analytics, Data Analytics, And Information management Systems (15 Points) demonstrated Expertise In Analyzing And Interpreting Data To Make Informed Decisions, Optimizing And Improving Dme Processes And Performance. Proven Expertise In Utilizing Data To Make Informed Decisions On A Project Or Program Success And Recommending Corrective Actions. Demonstrated Ability To Work With Current Technologies, To Research, Investigate, And Communicate Complex Issues In A Timely And Concise Manner, Orally And In Writing, And To Integrate Evidence Into Advice. factor 4: Collaboration And Leadership (15 Points) demonstrated Ability To Work Collaboratively With And Resolve Challenging Situations Among Different Offices, Agencies And Stakeholders. Demonstrated Successful Supervisory Experience In The Project Management Field, Of Personnel At Different Levels Of Knowledge And Specialization, Preferably In A Multicultural Environment. Demonstrated Experience In Effectively Coordinating And Managing Teams As They Work Across Multiple Projects With Competing Priorities Under Deadlines. The Ability To Speak And Write Spanish At A Professional Level Is Preferred. basis Of Rating: Offerors Who Clearly Meet The Education/experience Requirements Will Be Further Evaluated Based On Scoring Of The Evaluation Factor Responses. Offerors Are Required To Address Each Of The Evaluation Factors In A Separate Document Describing Specifically And Accurately What Experience, Training, Education And/or Awards They Have Received That Are Relevant To Each Factor. Failure To Specifically Address The Evaluation Factors May Result In Your Not Receiving Credit For All Of Your Pertinent Experience, Education, Training And/or Awards. the Offeror Rating System Is As Follows: evaluation Factors Have Been Assigned The Following Points: factor #1 – 20 factor #2 – 20 factor #3 – 15 factor #4 – 15 total Possible – 70 Points interview Performance – 30 Points satisfactory Professional Reference Checks – Pass/fail (no Points Assigned) past Performance Evaluation Of Applicant’s Ability To Perform Under The Contract. In Conducting The Evaluation, The U.s. Government Reserves The Right To Utilize All Evaluation Information Available At The Time Of Evaluation, Whether Provided By The Applicant Or Obtained From Other Sources. total Possible Points: 100 the Most Qualified Candidates May Be Interviewed, Required To Provide A Writing Sample, And Demonstrate An Ability To Operate Commonly Used Office Applications. Inl Will Not Pay For Any Expenses Associated With The Interviews. In Addition, Applications (written Materials And Interviews) Will Be Evaluated Based On Content As Well As On The Applicant's Writing, Presentation, And Communication Skills. In The Event That An Applicant Has Fully Demonstrated His/her Qualifications And There Are No Other Competitive Applicants, Inl Reserves The Right To Forego The Interview Process. Professional References Will Be Evaluated For Applicants Being Considered For Selection. compensation (base Pay) this Position Has Been Designated At The Fs-02 Equivalent Level ($101,395 - $148,902 Per Annum). Final Compensation Will Be Negotiated Within The Listed Market Value Based Upon Qualifications, Previous Relevant Experience And Work History, Salary And Educational Background. Salaries, Including Any Recruitment Supplemental Pay That Exceeds The Listed Pay Range, Will Not Be Entertained Or Negotiated. for Award, Inl Will Negotiate For This Contract Based On The Market Value As Outlined Above And Overall Experience Relevant To The Solicitation Requirements. benefits & Allowances as A Matter Of Policy, Inl Normally Authorizes The Following Benefits And Allowances benefits - If Applicable • Employee's Fica/medicare Contribution • Contribution Toward Health And Life Insurance • Pay Comparability Adjustment • Annual Increase • Eligibility For Worker's Compensation • Annual, Sick And Home Leave • 401k Plan • Medvac (provided By Dos Med) allowances In Accordance With Department Of State Standardized Regulations (dssr) - If Applicable • Temporary Quarters Subsistence Allowance (tqsa) Or Per Diem Upon Arrival At Post • Housing Allowance • Post Allowance • Supplemental Post Allowance • Maintenance Allowance (sma) • Education Allowance • Educational Travel (full-time United States Based Secondary) • Post Hardship Differential • Danger Pay • Shipment Of Hhe, Uab, Pov And Consumables
Closing Date24 Jan 2025
Tender AmountRefer Documents 

Monastery Nad Ohri Tender

Civil And Construction...+1Civil Works Others
Czech Republic
Details: The subject of the contract is the construction of a multi-purpose playground in the Petlérská Primary School complex in Klášterec Nad Ohří. The construction is located on plot no. 1704/169 in the area of the original playground, which will be demolished, and in its place a new multi-purpose sports field measuring 38 x 21 meters will be created, designed for sports such as volleyball, football, streetball, five-a-side football and tennis, according to the planning application prepared by Linhart, Ltd. The playground will be fenced with a fence with a total height of 4 m. Up to a height of 1 m, the fencing will be made partly of wooden planks. Welded 2D fence panels with a wire diameter of 6.8 mm and 5.6 mm will be placed above them. The fencing will be anchored to concrete footings and a concrete belt made of cast formwork. The posts are square in cross-section, measuring 80x80 mm. The playground is bordered on two sides by an access path made of interlocking paving stones. The terrain will be leveled using a 1:2 slope. The slope will be formed mainly from the existing base, which will be created during the preparatory work, and approximately 16 m3 of soil will be brought in for grassing. The existing basketball hoops will be carefully dismantled and handed over to the investor for further use. The construction is designed so as not to negatively affect the surrounding buildings and land. The drainage system ensures the drainage of rainwater in the form of a seepage, which ensures the protection of the surroundings from excessive moisture. The new fencing is complemented by two gates with a width of 2,530 mm. One entrance is connected to the existing interlocking paving area, while the other is connected to a new paved interlocking paving area. The solution also includes a paved area for the installation of four benches and one waste bin with a protective canopy, all at the investor's choice. The pitch has a new permeable polyurethane surface with a thickness of 11 mm, which is laid on a two-layer asphalt base Ako 8 and Ako 16, both layers 40 mm thick. Concrete foundations measuring 700 x 700 x 800 mm are designed for the installation of volleyball and tennis posts with a diameter of 89 mm. These foundations will ensure sufficient stability and strength of the posts during their use. A steel casing with a diameter of 102 mm and a wall thickness of 4 mm will be concreted into the concrete foundations, into which the columns will be inserted. This construction allows for easy assembly and disassembly of the columns, which contributes to the flexibility of using the multi-purpose sports center for various types of sports. Access and arrival to the construction site is via the existing road. For details, see the Pd and the Bill of Quantities. The Contractor's delivery includes, in addition to the work specified in the Bill of Quantities, the provision of the following activities: * Execution of the work according to the Bill of Quantities, in accordance with valid permits, according to valid standards and regulations, including the expected work related to the subject of the work (e.g. washing and cleaning of roads, transportation of materials and mechanization, etc.). * Engineering Activities of the Contractor for the Entire Duration of the Contract Until the Time of Handing Over the Communication to Its User Back into Use, I.e. Including Cooperation in the Acceptance Procedure and the Handover of All Necessary Documents of the Completed Construction. * Appointment of the Authorized Person Responsible for the Implementation of the Construction - Civil Engineering Department. * Provision of the Necessary Technical and Documentary Documentation of the Construction, Waste Disposal in Accordance with Applicable Legal Regulations. All Documents Will Be Marked with the Name of the Construction and Will Be Handed Over After the Completion of the Construction. * Treatment of the Areas of All Construction Sites Affected by the Contractor's Activities, Unless Their Treatment is the Subject of the Contract, Including the Removal of Damage Caused by the Construction. * Before Commencing Construction Work, the Contractor Will Ensure the Marking and Protection of Engineering Networks and Underground Facilities on the Construction Site. * Before the start of the work, a photo documentation of the current state of adjacent buildings (e.g. buildings, fences and fence foundations), as well as land, will be taken. * Ensuring compliance with safety regulations. * Energy consumption and costs for the equipment of the construction site throughout the entire construction period, including the provision of secondary energy measurement. * Demarcation of the construction by a responsible surveyor, including a demarcation protocol, documentation of the actual implementation, geodetic survey of the completed construction. We require the processing of geodetic documentation also in the Jvf Dtm. "the preparation of the geodetic part of the documentation of the actual implementation of the construction or the geodetic basis for maintaining a digital technical map of the Ústí nad Labem region, containing the geometric, positional and height determination of the completed construction or technological equipment, will be prepared in accordance with § 5 A in the structure according to Annexes No. 3 and 4 of Decree No. 393/2020 Coll. On the Digital Technical Map (DTM Decree), as amended, in the currently valid version of the exchange format according to § 6 of the DTM Decree. The geodetic basis is prepared using the existing data of the digital technical map. The geodetic basis includes an assessment of the continuity of the result of the survey of the new state with the existing state.” * The completed construction will be handed over to the use of the city of Klášterec nad Ohří. For some of these activities, separate items are not listed in the Vv. The costs of ensuring the above will be included and allocated to individual items of construction work and thus to the total costs of the construction.
Closing Date20 Jan 2025
Tender AmountCZK 4.1 Million (USD 169.9 K)

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+1Others
Corrigendum : Closing Date Modified
United States
Details: Amendment I (corrected Typos) description: This Is A Pre-solicitation Notice For The Establishment Of An Architect-engineering (a-e) Design Contract With Services To Be Performed At The Charles George Va Medical Center At 1100 Tunnel Road, Asheville, Nc 28805. This Requirement Is Being Executed Under A 100% Set-aside To Service-disabled Veteran Owned Small Business (sdvosb). This Announcement Is Not A Request For Proposal; No Solicitation Package Will Be Issued Until After An Evaluation Has Been Made On The Provided Sf330s. The Sf330 Can Be Downloaded Through The Gsa Forms Library At: Http://www.gsa.gov/portal/forms/type/top. Scroll Down To Locate And Click On The Sf-330 Hyperlink Entitled, “architect-engineer Qualifications.” Interested Firms Should Submit Their Current Sf330, Parts I And Ii, To Keith.hunter@va.gov. The Sf330s Are Due No Later Than 8:00 Am Est January 24, 2025. scope Of Work: This Project Will Engage An Architectural Engineering Firm For Professional Architect/engineer (ae) Services Necessary To Design For The Replacement Of The Existing Air Handling Unit #11 Serving The Imaging Department In Buildings 47 At The Charles George Vamc, Asheville, Nc. Air Handling Unit, Supply And Return Fan, Heating/cooling Coils And Piping Shall Be Sized To Meet The Temperature And Air Exchange Needs Of Approximately 10,000 Square Feet Of Space. Work Includes Investigating The Site, Taking Calculation And Designing For The Replacement Of The Air Handling Unit, Structural Support, Fans, Coils Piping, And Control System. Project Also Involves Investigating And Sizing The Supply And Return Ductwork And Associates Variable Volume Supply Box And/or Constant Volume Supply Box. Ceilings And Walls May Need To Be Modified To Accommodate Removal Of Old Ductwork And Installation Of New Ductwork. The New System Will Replace The Existing System In The Exact Location. Design Includes Mechanical Engineering, Electrical Engineering, Structural Engineering And Architectural Disciplines. requirements: the Ae Selected Is Expected To: part Ia – Preparation Of Existing Conditions And Conceptual Design – Investigative Services: Preparation Of Existing Conditions Plan And Conceptual Design Which Includes Site Investigation For Architectural, Mechanical, Electrical, And Environmental Hazards Such As Suspect Asbestos Containing Material (acm). Work Will Consist Of Ae Personnel Removing Ceiling Tile(s) And Tracing Ductwork, Electrical, And Plumbing Above Ceilings. Perform Project Site Investigation In Accordance With The ‘site Investigations’ Section Of This Scope Of Work. physically Survey As Well As Review Record Drawings Of The Existing Building. Inform Co/cor Of Supplemental Information Gathering That May Be Required. conduct On-site Work Session With User Group And Other Members Of The Integrated Project Team To Discuss Conceptual Options. describe All Measures Available To Achieve The Project Objectives, Including The Benefits And Drawbacks Of Each Measure, To Guide Decisions By The Facility During Schematic Design. The Decision Of Which Alternatives To Select For The Construction Project Rests With The Va. develop And Describe A Construction Strategy That Allows Existing Functions To Continue During Construction. Develop This Strategy In Development Of Construction Documents. participate In A Conference Call After Va Has Completed Schematic Design Review ae Shall Review Needs Identified By The Ipt For The Area Under Consideration For Design And Provide Recommendations. In Addition, The Project Shall Be Phased To Minimize The Impact To The Medical Center Operations And Patient Care. Prior To Submission Of Schematic Design Material, The Ae Shall Meet With The Vamc’s Cor To Discuss Proposed Phasing Requirements For The Project. These Phasing Requirements Shall Describe The General Sequence Of The Project Work, Estimated Project Duration, And What Va Constraints Will Exist That Will Influence The Contractor's Approach To The Construction Project. The Ae Shall Be Responsible For Documenting The Phasing Requirements. the Ae Shall Make Site Visits As Required To Determine Existing As-built Conditions Affecting This Project. Information, Including Drawings And Other Documentation, Provided To The Ae Shall Be Used As Reference Only. The Ae Is Responsible For Verifying All Existing Site Conditions To Include But Not Be Limited To Crawling In Crawlspaces, Looking Above Ceilings And The Building Penthouse. coordinate Visits With The Cor As Assigned At The Ntp. The Ae Shall Arrange For And Oversee The Performance Of Such Investigations Necessary For The Proper Design Of The Project. Autocad Background Drawings Shall Be Provided By The Va Upon Request If Available And Shall Be Used As Reference Only. The Ae Shall Field Verify Every Aspect That Relates To The Project. perform Photographic Documentation During Investigative Services; Files Are To Be Maintained For Future Reference Of Existing Conditions For Construction Documents And Unforeseen Unit Costing Basis. the Contractor Shall Prepare Digital Photo Documentation Of Construction Work, Including Sites, Buildings, And Field Activities. Digital Photos Shall Be Submitted In Jpeg Format To The Project Website, And To A Resolution Sufficient And Appropriate For The Type Of Work Photographed. The Contractor Shall Provide An Index For Each Set Of Photographs Submitted Identifying The Contractor, Base, Facility, Project Number, Date, And A Brief Description. The Contractor Shall Coordinate Photography Of Any Kind Through The Cor. the Ae Shall Complete All Necessary Site Investigations Prior To The 15% Schematic Design Submission. part Ib – Preparation Of Contract Drawings And Specifications – Design Development: Preparation And Submission Of Construction Bid Documents, Interim Design Document Submittals, And The Final Construction Bid Documents At The Completion Of The Design Development Process In Accordance With The ‘design Package Submission Schedule’ Section. Design Document Packages Shall Contain A Complete Set Of Documents As Specified In The ‘design Requirements/submissions’ Section Of This Statement Of Work (sow). The Ae Shall Develop A Design Necessary To Meet The Requirements In The ‘project Scope’ Section Of This Sow. Design Shall Include Engineering Services Rendered Necessary By Va (veterans Affairs) At The End Of Part Ia Investigative Services Within The Construction Cost Parameters. design And Produce Construction Documents For Implementation Of The Selected Alternatives. submittals Must Include The Components Listed On The A/e Submission Instructions For Minor And Nrm Construction Program Https://www.cfm.va.gov/​til/​ae/​aesubmin.doc. submittal Register - Provide A List To The Va Of Technical Submittals That Will Be Required. intended For Long-term Use, The Project Design Specifications Must Provide, To The Maximum Extent Practicable, A Final Product Of Enduring Quality; Energy And Water Efficient; Environmentally Conscious; Functional And Requiring Low Maintenance; Durable; Flexible For Changing Uses; Universally Accessible; Sustainable; Operationally Cost Effective; Compliant With Appropriate Codes, Statutes, And Vha Requirements. construction Documents Must Be Complete, Clear, Specific, Accurate, Coordinated Between Disciplines, Quantifiable, And Explicit In Quality Expectations For Suitable Materials, Systems, And Workmanship. throughout The Design Phases Of The Project, The A/e Shall Work Closely With The Cor And Integrated Project Team To Ascertain And Confirm All Project Requirements. the Contractor Shall Attend Meetings And Teleconferences To Discuss Technical Requirements, Issues, And Project Progress And Status As Required. The Contractor Shall Prepare, And Submit For Review, Presentation Materials For Meetings And An Agenda. The Contractor Shall Be Responsible For Taking Meeting Minutes, Prepare And Submit Minutes For All Meetings Attended No Later Than 3 Business Days, With The Exception Of The Ipt Meetings As Discussed In Previous Paragraph, After The Meeting Has Occurred. The Minutes Shall Be Sent To The Contracting Officer And Cor For Coordination And Approval Prior To Distribution. the Ae Shall Provide An Evaluation, Cost Estimate And Conceptual Plans To Determine The Feasibility Of Completing The Project Within Project Budget. Disadvantages And Advantages Shall Be Provided Including Impacts To Patient Care/medical Center Operations And Order Of Magnitude Cost Estimates (with Cost Of Patient Care Factored Into The Economy/feasibility) part Ii – Construction Period Services: Review And Provide Concise Recommendations On All Submittals, Shop Drawings, Product Data, Samples, Rfis, Change Order Proposals, Etc. In Accordance With ‘construction Period Services’ Section Of This Sow. Services Shall Include Providing Record Drawings Based On Finalized Contractor Red-line As-builts. assist In Answering Questions And Provide Clarifications As Deemed Necessary By The Contracting Officer Or Cor During Solicitation And Issuing Any Addendums, Revise Drawings/specifications, Etc. Necessary To Fully And Completely Address Questions Any And All Questions Submitted By The Cor, Contracting Officer And Awarded Construction Contractor. serve As An Advisor And Provide Assistance To The Va To Determine Whether The Contractor Or Subcontractor Meets Technical Qualification Requirements, Assist In The Review Of Contractor Proposals For Technical Acceptability, Support By Written Recommendations Of Any Problems Or Litigation Encountered In Past Performance Based On First-hand Knowledge. review All Submissions And Provide Concise Direction To The Va. Provide Direction Within 5 Business Days Upon Request For Shop Drawings, Product Data, Installation Instructions, Samples, Etc. Provide Direction Within 5 Business Days For Rfi’s And Change Order Proposals. Changes To Contract Documents Based On Errors And Omissions In Design Will Be At No Cost To The Va To Include Cost Estimates For The Change. The Co Shall Make The Final Determination On What Is Or Is Not An Error Or Omission. provide Commissioning For All Affected Systems. prepare Record Drawings Based On Contractor Red-line As-built Drawings With Correspondence Performed During Construction. The Ae Shall Provide A Set Of Updated Drawings And Specifications On Cd Within 20 Business Days Of Construction Contract Completion To The Cor. the Ae Shall Function As The Commissioning Agent For All Necessary Commissioning Actions. The Ae Shall Provide Testing, Inspection And Reporting Services During Construction. The Ae Must Conduct A Site Visit, At Least Once A Month, During Each Phase Of The Project, And Must Be Present For Every Test Or Inspection And To Document The Outcome. part Iii – Construction Period Site Visits: Visit The Site At The Request Of The Va In Accordance With Section ‘site Visits’ In This Sow. The Ae Shall Respond On Site Within An 8-hour Period When Requested. The Total Number Of Site Visits During The Construction Period Is Estimated To Be Five (5) For This Project, Which May Be Finalized After Selection Of The Ae And During Negotiation Of The Proposal. Each Site Visit Shall Be Documented Through A Field Report Denoting The Purpose And Results Of The Site Visit. make Site Visits On Requests Of The Va And Prepare Documented Field Reports Denoting The Purpose And Results Of The Site Visit, To Include Agreed Upon Changes In Design As Determined Necessary During The Construction. Visits Made Based On Errors And Omissions In Design Will Be At No Cost To The Va. participate In Partial/final Acceptance Inspections (in-wall, Above Ceiling, And Final) As Scheduled And Generate Punch List Items For Completion. Inspections Shall Cover Quality Of Installations And Locations/placement Of Items In Accordance With The Contract Documents. The Punch List Shall Reference The Contract Documents For Specific Deficiencies (i.e. Specification Section, Drawing Detail, Etc.). attend The Pre-bid And Pre-construction Conference To Review And Confirm Project Scope. during Construction, Allow For A Minimum Of Site Visits As Negotiated For The Contract, As Directed And Scheduled By The Cor. offerors Will Be Evaluated On The Following Criteria: the Submitted Sf330’s Shall Be A Maximum Of 30 Total Pages. All Necessary Information To Meet The 5 Criterions Shall Be Contained Within Those 30 Pages As The Evaluation Will Stop At The End Of Page 30. the Submitted Sf330s Will Be Evaluated On The Following Criteria: this Acquisition Will Be In Accordance With Far Part 36.602-1 And Vaar Part 836.601-1. The Following Evaluation Criteria Will Be Used To Evaluate Sf330 Technical Proposals: the Architect/engineer (ae) Must Demonstrate Its Qualifications With Respect To The Published Evaluation Criteria For All Services. Evaluation Criteria (1) Through (4) Are Considered The Most Important And Listed In Descending Order Of Importance; Criteria (5) Is Significantly Less Importance Than (1) Through (4) But The Associated Value Of 1 Through 4 Are In A Declining Value And Order Of Importance. Criterion (1) Is The Highest With Criterion (5) Being The Lowest. (1) Professional Qualifications Necessary For Satisfactory Performance Of Required Services; (2) Specialized Experience And Technical Competence In The Type Of Work Required, Including, Where Appropriate, Experience In Medical Facility Design; (3) Capacity To Accomplish The Work In The Required Time; (4) Past Performance On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Of Work, And Compliance With Performance Schedules; (5) Location In The General Geographical Area Of The Project And Knowledge Of The Locality Of The Project; If Application Of This Criterion Leaves An Appropriate Number Of Qualified Firms, Given The Nature And Size Of The Project. criterion 1 - Professional Qualifications Necessary For Satisfactory Performance Of Required Services. Offerors Will Be Evaluated In Terms Of The Qualifications, Competence And Experience Of The Key Personnel And Technical Team Proposed To Accomplish This Work. Key Personnel Are Individuals Who Will Have Major Contract Or Project Management Responsibilities And/or Will Provide Unusual Or Unique Expertise. Provide A Balanced Licensed And Or Certified Workforce In The Following Disciplines – Architectural, Electrical, Mechanical, And Structural Design. submission Requirements: Provide Resumes For All Proposed Key Personnel. Resumes Are Limited To One Page Each And Should Cite Project Specific Experience And Indicate Proposed Role In This Contract. Provide Professional Registration, Certification, Licensure And/or Accreditation. Indicate Participation Of Key Personnel In Example Projects In The Sf330 Part 1 Section G. criterion 2 - Specialized Experience And Technical Competence In The Type Of Work Required, Including, Where Appropriate, Experience In Medical Facility Design. Offerors Will Be Evaluated On Specialized Experience And Technical Competence In The Performance Of Services Like Those Anticipated Under This Contract About: special Knowledge Of Mechanical, Electrical And Structural Engineering. experience Working In And Around An Operational Hospital specific Experience And Qualifications Of Personnel Proposed For Assignment To The Project And Their Record Of Working Together As A Team. submission Requirements: Provide Up To Five (5) Projects Completed Or Substantially Completed Within The Past Five (5) Years That Best Illustrate Specialized Experience Of The Proposed Team In The Areas Outlined Above. Example Projects Shall Note Project’s Square Footage. All Projects Provided In The Sf-330 Must Be Completed By The Office/branch/regional Office/individual Team Member Proposed To Manage And/or Perform Work Under This Contract. To Enable Verification, Firms Should Include The Duns Number Along With Each Firm Name In The Sf330 Part 1, Section F Item 25 “firms From Section C Involved In This Project,” Block (1). Include A Contract Number Or Project Identification Number In Block 21. Include An E-mail Address And Phone Number For The Point Of Contact In Block 23(c). Include In The Project Description, The Contract Period Of Performance, Award Contract Value, Current Contract Value, And Summary Of The Work Performed That Demonstrates Relevance To Specialized Experience As Outlined Above. If The Contractor Served As A Subcontractor On A Project, Indicate The Value Of The Work They Provided Towards The Performance Of The Overall Project. If A Project Was Performed By A Joint Venture, And Not All Joint Venture Partners Are On The Team Proposed For This Contract, The Offeror/team Should Specifically Address The Work Performed By The Joint Venture Partner Offering/teaming On This Contract. Likewise, If The Offeror/team Member Worked As A Subcontractor On A Project, The Description Should Clearly Describe The Work Performed By The Offeror/team Member And The Roles And Responsibilities Of Each On The Project, Rather Than The Work Performed On The Project As A Whole. If The Project Description Does Not Clearly Delineate The Work Performed By The Entity/entities Offering/teaming On This Contract, The Project Could Be Eliminated From Consideration. Additionally, Firms Are Required To Return And Submit The Attachment B Titled Criterion 2 Format, Which Will Clearly Demonstrate Specific Experiences And Qualifications Of Personnel Proposed For Assignment To The Project And Their Record Of Working Together As A Team. Specifically List Similar Scoped Projects Covering The Previous 10 Years And Clearly Show Participation. (see Sf330 Part I Section G, But Not Excluding Other Information Provided On The Sf330 And Supporting Documentation.) note: If The Offeror Is A Joint Venture, Information Should Be Submitted As A Joint Venture; However, If There Is No Information For The Joint Venture, Information Should Be Submitted For Either Joint Venture Partner, Not To Exceed A Total Of Five (5) Projects For This Criterion. Projects Shall Be Submitted On The Sf-330. For Submittal Purposes, A Task Order On An Idiq Contract Is Considered A Project, As Is A Stand-alone Contract Award. Do Not List An Idiq Contract As An Example Of A Completed Project. Instead, List Relevant Completed Task Orders Or Stand-alone Contract Awards That Fit Within The Definition Above. Examples Of Project Work Submitted That Do Not Conform To This Requirement Will Not Be Evaluated. Failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers Could Result In A Firm Being Rated Lower. all Information For Criterion 2 Should Be Submitted In Part 1, Section F Of The Sf330. The Government Will Not Consider Information Submitted In Addition To Part 2, Section F In Evaluating Criterion 2. criterion 3 - Capacity To Accomplish The Work In The Required Time. Firms/teams Will Be Evaluated In Terms Of Their Ability To Plan For And Manage Work Under The Contract And Capacity To Accomplish The Work In The Required Time. submission Requirements: Describe The Firm’s Ability To Concurrently Perform And Manage Multiple Projects In Different Locations To Meet Aggressive Schedules, Multiple Disciplines, And Control Costs And The Firm’s Capacity To Accomplish Multiple Projects Simultaneously. Additionally, Prospective Contractors Are Required To Provide A List Of Current Projects With A Design Fee Of Greater Than $25,000 Currently Being Designed In The Firm’s Office. Indicate The Availability Of The Proposed Project Team (including Sub-consultants) For The Specified Contract Performance Period In Terms Of: (1.) Both The Average And Maximum Number Of Projects Being Worked Simultaneously For The Previous Twelve (12) Month Period, For Each Key Personnel Member, (2.) The Number Of Projects Currently Being Worked By Each Key Personnel Member Identified In The Sf330, And (3.) The Number Of Projects That Could Be Added To Workload, Given Size And Complexity. criterion 4 - Past Performance – Offerors Will Be Evaluated On Past Performance With Government Agencies And Private Industry In Terms Of Work Quality, Compliance With Schedules, Cost Control, And Stakeholder/customer Satisfaction. Evaluating Past Performance And Experience Will Include Information Provided In Past Performance Questionnaires (ppqs) Or Cpars/acass For Criterion 1 Projects And May Include Other Information Provided By The Firm, Customer Inquiries, Government Databases, And Other Information Available To The Government Including Contacts With Points Of Contact In Other Criteria. Failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers Could Result In A Firm Being Rated Lower. note: Past Performance Information For Projects Listed Under Criterion 1. project Recency: A Project Will Be Considered Recent Only If Performance Was Completed Within Five (5) Years Of The Date Of Issuance Of This Public Announcement. Ongoing Projects Will Not Be Considered As No Accurate Performance Record Can Exist For Work Not Yet Completed. submission Requirements: Submit A Completed The Past Performance Questionnaire (ppq) Included In This Notice Is Provided For The Offeror Or Its Team Members To Submit To The Client For Each Project The Offeror Includes Under Criterion 1. Ensure Correct Phone Numbers And Email Addresses Are Provided For The Client Point Of Contact. Submit No Less Than Three (3) And No More Than Five (5) Past Performance References For Recent And Relevant Projects Identified On Sf330 Part I Section F. Completed Ppqs Should Be Submitted With Your Sf330. If The Offeror Is Unable To Obtain A Completed Ppq From A Client For A Project(s) Before The Response Date Set Forth In This Notice, Offerors Should Complete And Submit With Their Responses The First Page Of The Ppq (attachment A), Which Will Provide Contract And Client Information For The Respective Project(s). Offerors May Submit A Ppq Previously Submitted Under A Different Notice/rfp (legible Copies Are Acceptable) If It Is On The Same Form As Posted With This Synopsis. Offerors Should Follow Up With Clients/references To Ensure Timely Submittal Of Questionnaires. If Requested By The Client, Questionnaires May Be Submitted Directly To The Government's Point Of Contact, Network Contracting Office 6, Attn: Samantha Cahill Via Email At Keith Hunter Via Email At Keith.hunter@va.gov Prior To The Response Date. Offerors Shall Not Incorporate By Reference Into Their Response Ppqs Or Cpars Previously Submitted In Response To Other Ae Services Procurements. However, This Does Not Preclude The Government From Utilizing Previously Submitted Ppq Information In The Past Performance Evaluation. criterion 5 - Location In The General Geographical Area (asheville, Nc) And Knowledge Of The (asheville, Nc); Provided, That Application Of This Criterion Leaves An Appropriate Number Of Qualified Firms, Given The Nature And Size Of The Project. Provided That The Application Of This Criterion Leaves An Appropriate Number Of Qualified Firms, Given The Nature And Size Of The Contract, Firms/teams Will Be Evaluated On The Locations Of Their Office Or Offices That Will Be Performing The Work Under This Contract. submission Requirements: Indicate Firm’s/team’s Location, Including Main Offices, Branch Offices, And Any Sub Consultant’s Offices, As Well As Demonstrate How This Will Be Advantageous To The Government. selection Interview: discussions/interviews Shall Be Scheduled With Firms Slated As The Most Highly Qualified. Firms Slated For Interviews Will Be Asked A Series Of Established Questions. Elaborate Presentations Are Not Desired, But Selected Firms Should Be Prepared To Present A Summary Of Their Qualifications And Similar Projects To The Evaluation Team. Firms Selected To Move To This Stage Of The Evaluation Will Be Limited To A 30 Minute Time Block. general Information: all Design And Work Will Conform To The Current Edition Of The Va Master Specifications And Va Design Standards As Published At The Following Site: Www.cfm.va.gov; Asme, Osha, Ibc 2009, Nfpa And Nec Building Codes And Standards. Coordinate All Work Through The Contracting Officer’s Representative (cor) Of Facilities Management Service. Contractor Is Responsible For All Cleanups And Refuse Disposal Throughout The Construction Period. The Ae Firm Will Prepare Drawings And Specifications In Enough Detail Such That Qualified Outside General Contracting Companies Can Prepare Accurate And Timely Proposals For The Desired Construction Work. Microsoft Project Scheduling And Management Software Will Be Used By Both The Ae And Contractors To Allow For Regular Tracking Of Schedules And Work By The Va Medical Center. Schedules With Ms Project Will Be Regularly Sent To The Cor Upon Project Initiation And Whenever Significant Changes Occur In The Schedule. The Estimated Magnitude Of Construction Is Between $2,000,000.00 And $5,000,000.00. The Ae Will Provide An Initial Estimate Of Cost To Perform The Above Work And Will Design Only Those Items That Can Be Provided Within The Cost Limitation. The Estimated Cost Of Construction (ecc) Shall Only Be Provided To The Contractor In Which A Formal Proposal Is Sought For The Purposes Of Providing A Proposal. The Medical Center Must Remain Operational Throughout The Construction Period And A Detailed Sequence Of Work Will Be Provided By The Ae To Minimize Impact Of The Construction. The Ae Will Provide Documents At Each Submission As Indicated In The Statement Of Work. The Naics Code For This Procurement Will Be 541330, Engineering Services. The Current Small Business Size Standard For 541330 Is $25.5 Million. design Costs: All Offerors Are Advised That In Accordance With Vaar 836.606-71(a) The Total Cost Of The Architect Or Engineer Services Contracted For Must Not Exceed Six Percent (6%) Of The Estimated Cost Of The Construction Project Plus Any Fees For Related Services And Activities. Additionally, Far 52.236-22 Design Within Funding Limitations, Will Be Applicable To This Procurement Action. Design Limitation Costs Will Be Provided To The Most Highly Rated A-e Firm(s) Selected In Accordance With The Outlined Process. limitations On Subcontracting: In Accordance With Vaar 852.219-73, Va Notice Of Total Set-aside For Verified Service-disabled Veteran-owned Small Business And 13 Cfr 125.6, A Service-disabled Veteran-owned Small Business Concern (sdvosb) Agrees That, In The Performance Of The Contract, It Will Not Pay More Than 50% Of The Amount Paid By The Government To Firms That Are Not Similarly Situated. Firms That Are “similarly Situated” Are Those That Are Also Cve-registered Sdvosbs. requirement For Electronic Submission unless Paper Offers Are Specifically Authorized, All Responses To This Pre-solicitation Notice Must Be Submitted Electronically As Described Below. The Only Acceptable Paper Form For This Requirement Is The Receipt Of Past Performance Questionnaires. Failure To Comply With This Requirement May Jeopardize The Possibility Of Receiving An Award For The Contract Due To Non-compliance With The Terms Of The Solicitation. You Must Submit Your Electronic Offer, And Any Supplemental Information (such As Spreadsheets, Backup Data, Technical Information), Using Any Of The Electronic Formats And Media Described Below. in Addition, Contractors Are Notified Of The Award Via An Electronic Notice Of Award E-mail. The Award Document Will Be Attached To The Notice Of Award E-mail. acceptable Electronic Formats(software) For Submission Of Offers files Readable Using The Current Microsoft* Office Version Products: Word, Excel, Powerpoint, Or Access. Spreadsheet Documents Must Be Sent In A Format That Includes All Formulas, Macro, And Format Information. Print Or Scan Images Of Spreadsheets Are Not Acceptable. Please See Security Note Below For Caution Regarding Use Of Macros. When Submitting Construction Drawings Contractors Are Required To Submit One Set In Autocad And One Set In Adobe Pdf. (purpose: Contracting Can Open The Pdf Version And Engineering Can Open Autocad Files) files In Adobe* Pdf (portable Document Format) Files: When Scanning Documents Scanner Resolution Should Be Set To 200 Dots Per Inch, Or Greater. another Electronic Format. If You Wish To Submit An Offer Using Another Format Than Those Described In These Instructions, E-mail The Contracting Officer/specialist Who Issued The Solicitation. Please Submit Your Request At Least Five (5) Calendar Days Before The Scheduled Closing Date Of The Solicitation. Request A Decision As To The Format Acceptability And Make Sure You Receive Approval Of The Alternate Format Before Using It To Send Your Offer. please Note That We Can No Longer Accept .zip Files Due To Increasing Security Concerns. e-mail Submission Procedures: For Simplicity In This Guidance, All Submissions In Response To A Solicitation Will Be Referred To As Offers. subject Line:include The Solicitation Number, Name Of Company, And Closing Date Of Solicitation. size:maximum Size Of The E-mail Message Shall Not Exceed Ten (10) Megabytes.the Sf330, In Its Entirety, Shall Not Exceed One Email Of 5mb. The Sf330 (not Including Past Performance Questionnaires) Are Limited To 30 Pages. If The Page Limits Are Exceeded, The Pages In Excess Of The Limit Will Not Be Read Nor Considered. Only One Email Is Permitted Unless Otherwise Stated In This Paragraph Or In Writing By The Contract Officer Submitting The Solicitation. Due To Va It Security Protocols, Email Submissions Are Limited To 10mb Per Email. Furthermore, It Is The Sole Responsibility Of The Prospective Firms To Confirm Receipt Of Their Submission In Its Entirety Prior To The Closing Date And Time Of Their Submission In Response To This Synopsis. security Issues, Late Bids, Unreadable Offers late Submission Of Offers Is Outlined At Far Parts 52.212-1(f), 52.214-7, And 52.215-1(c)(3). Attention Is Warranted To The Portion Of The Provision That Relates To The Timing Of Submission. please See Far 15.207(c) For A Description Of The Steps The Government Shall Take With Regard To Unreadable Offers. to Avoid Rejection Of An Offer, Vendors Must Make Every Effort To Ensure Their Electronic Submission Is Virus-free.submissions Or Portions Thereof Submitted And Which The Automatic System Detects The Presence Of A Virus, Or Which Are Otherwise Unreadable Will Be Treated As “unreadable” Pursuant To Far Parts 14.406 And Far 15.207(c). the Virus Scanning Software Used By Our E-mail Systems Cannot Always Distinguish A Macro From A Virus. Therefore, Sending A Macro Embedded In An E-mail Message Or An E-mail Attachment May Cause The E-mail Offer To Be Quarantined. You May Send Both The Spreadsheet And The Spreadsheet Saved In Pdf Format To Ensure That Your Proposal Is Readable. password Protecting Your Submission Is Not Permitted. The Contracting Officer Will File The Offer Electronically Which Will Allow Access Only By Designated Individuals. important Notice: Apparent Successful Offerors Must Apply For And Receive Verification From The Small Business Administration (sba) In Accordance With 38 Cfr Part 74 And Vaar 819.70 By Submission Of Documentation Of Veteran Status, Ownership, And Control Enough To Establish Appropriate Status, Offerors Must Be Both Visible And Verified By The Small Business Administration (sba) At The Time Of Submission Of Offers And At The Time Of Award. Failure To Be Both Verified By Sba And Visible On Vetcert At The Time Of Submission Of Offers And At The Time Of Award Will Result In The Offeror’s Proposal Being Deemed Non-compliant. All Offerors Are Urged To Contact The Sba And Submit The Required Documents To Obtain Sba Verification Of Their Sdvosb Status If They Have Not Already Done So. important Addendum To 852.219-73 Va Notice Of Service-disabled Veteran-owned Small Business Set Aside: Va’s Vendor Information Pages (vip) Database Is No Longer Active. Small Business Administration Will Now Verify Sdvosb Status. Offerors Must Be Listed On Sba’s Veteran Small Business Certification (vetcert) Database At Https://veterans.certify.sba.gov/. 852.219-73 Va Notice Of Total Set-aside For Verified Service-disabled Veteran-owned Small Businesses. as Prescribed In 819.7011, Insert The Following Clause: va Notice Of Total Set-aside For Verified Service-disabled Veteran-owned Small Businesses (nov 2022) (a) Definition. For The Department Of Veterans Affairs, “service-disabled Veteran-owned Small Business Concern Or Sdvosb”: (1) Means A Small Business Concern - (i) Not Less Than 51 Percent Of Which Is Owned By One Or More Service-disabled Veterans Or, In The Case Of Any Publicly Owned Business, Not Less Than 51 Percent Of The Stock Of Which Is Owned By One Or More Service-disabled Veterans Or Eligible Surviving Spouses (see Vaar 802.201, Surviving Spouse Definition); (ii) The Management And Daily Business Operations Of Which Are Controlled By One Or More Service-disabled Veterans (or Eligible Surviving Spouses) Or, In The Case Of A Service-disabled Veteran With Permanent And Severe Disability, The Spouse Or Permanent Caregiver Of Such Veteran. (iii) The Business Meets Federal Small Business Size Standards For The Applicable North American Industry Classification System (naics) Code Identified In The Solicitation Document. (iv) The Business Has Been Verified For Ownership And Control Pursuant To 38 Cfr Part 74 And Is Listed In Va's Vendor Information Pages (vip) Database At Https://www.vetbiz.va.gov/vip/; And (v) The Business Will Comply With Vaar Subpart 819.70 And Small Business Administration (sba) Regulations Regarding Small Business Size And Government Contracting Programs At 13 Cfr Parts 121 And 125, Provided That Any Reference Therein To A Service-disabled Veteran-owned Small Business Concern Or Sdvo Sbc, Is To Be Construed To Apply To A Va Verified And Vip-listed Sdvosb, Unless Otherwise Stated In This Clause. (2) The Term “service-disabled Veteran” Means A Veteran, As Defined In 38 U.s.c. 101(2), With A Disability That Is Service-connected, As Defined In 38 U.s.c. 101(16). (3) The Term “small Business Concern” Has The Meaning Given That Term Under Section 3 Of The Small Business Act (15 U.s.c. 632). (4) The Term “small Business Concern Owned And Controlled By Veterans With Service-connected Disabilities” Has The Meaning Given The Term “small Business Concern Owned And Controlled By Service-disabled Veterans” Under Section 3(q)(2) Of The Small Business Act (15 U.s.c. 632(q)(2)), Except That For A Va Contract The Firm Must Be Listed In The Vip Database (see Paragraph (a)(1)(iv) Of This Clause). (b) General. (1) Offers Are Solicited Only From Vip-listed Sdvosbs. Offers Received From Entities That Are Not Vip-listed Sdvosbs At The Time Of Offer Shall Not Be Considered. (2) Any Award Resulting From This Solicitation Shall Be Made To A Vip-listed Sdvosb Who Is Eligible At The Time Of Submission Of Offer(s) And At The Time Of Award. (3) The Requirements In This Clause Apply To Any Contract, Order Or Subcontract Where The Firm Receives A Benefit Or Preference From Its Designation As An Sdvosb, Including Set-asides, Sole Source Awards, And Evaluation Preferences. (c) Representation. Pursuant To 38 U.s.c. 8127(e), Only Vip-listed Sdvosbs Are Considered Eligible To Receive Award Of A Resulting Contract. By Submitting An Offer, The Prospective Contractor Represents That It Is An Eligible Sdvosb As Defined In This Clause, 38 Cfr Part 74, And Vaar Subpart 819.70. (d) Agreement. When Awarded A Contract Action, Including Orders Under Multiple-award Contracts, An Sdvosb Agrees That In The Performance Of The Contract, The Sdvosb Shall Comply With Requirements In Vaar Subpart 819.70 And Sba Regulations On Small Business Size And Government Contracting Programs At 13 Cfr Part 121 And Part 125, Including The Non-manufacturer Rule And Limitations On Subcontracting Requirements In 13 Cfr 121.406(b) And 13 Cfr 125.6. Unless Otherwise Stated In This Clause, A Requirement In 13 Cfr Parts 121 And 125 That Applies To An Sdvo Sbc, Is To Be Construed To Also Apply To A Vip-listed Sdvosb. For The Purpose Of Limitations On Subcontracting, Only Vip-listed Sdvosbs (including Independent Contractors) Shall Be Considered Eligible And/or “similarly Situated” (i.e., A Firm That Has The Same Small Business Program Status As The Prime Contractor). An Otherwise Eligible Firm Further Agrees To Comply With The Required Certification Requirements In This Solicitation (see 852.219-75 Or 852.219-76 As Applicable). These Requirements Are Summarized As Follows: (1) Services. In The Case Of A Contract For Services (except Construction), The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance To Firms That Are Not Vip-listed Sdvosbs (excluding Direct Costs To The Extent They Are Not The Principal Purpose Of The Acquisition And The Sdvosb/vosb Does Not Provide The Service, Such As Airline Travel, Cloud Computing Services, Or Mass Media Purchases). When A Contract Includes Both Services And Supplies, The 50 Percent Limitation Shall Apply Only To The Service Portion Of The Contract (2) Supplies/products. (i) In The Case Of A Contract For Supplies Or Products (other Than From A Non-manufacturer Of Such Supplies), The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, To Firms That Are Not Vip-listed Sdvosbs. When A Contract Includes Both Supply And Services, The 50 Percent Limitation Shall Apply Only To The Supply Portion Of The Contract. (ii) In The Case Of A Contract For Supplies From A Non-manufacturer, The Sdvosb Prime Contractor Will Supply The Product Of A Domestic Small Business Manufacturer Or Processor, Unless A Waiver As Described In 13 Cfr 121.406(b)(5) Has Been Granted. Refer To 13 Crf 125.6(a)(2)(ii) For Guidance Pertaining To Multiple Item Procurements. (3) General Construction. In The Case Of A Contract For General Construction, The Sdvosb Prime Contractor Will Not Pay More Than 85% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, To Firms That Are Not Vip-listed Sdvosbs. (4) Special Trade Construction Contractors. In The Case Of A Contract For Special Trade Contractors, No More Than 75% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, May Be Paid To Firms That Are Not Vip-listed Sdvosbs. (5) Subcontracting. An Sdvosb Must Meet The Naics Size Standard Assigned By The Prime Contractor And Be Listed In Vip To Count As Similarly Situated. Any Work That A First Tier Vip-listed Sdvosb Subcontractor Further Subcontracts Will Count Towards The Percent Of Subcontract Amount That Cannot Be Exceeded. For Supply Or Construction Contracts, The Cost Of Materials Is Excluded And Not Considered To Be Subcontracted. When A Contract Includes Both Services And Supplies, The 50 Percent Limitation Shall Apply Only To The Portion Of The Contract With The Preponderance Of The Expenditure Upon Which The Assigned Naics Is Based. For Information And More Specific Requirements, Refer To 13 Cfr 125.6. (e) Required Limitations On Subcontracting Compliance Measurement Period. An Sdvosb Shall Comply With The Limitations On Subcontracting As Follows: x By The End Of The Base Term Of The Contract Or Order, And Then By The End Of Each Subsequent Option Period; Or __by The End Of The Performance Period For Each Order Issued Under The Contract. (f) Joint Ventures. A Joint Venture May Be Considered Eligible As An Sdvosb If The Joint Venture Is Listed In Vip And Complies With The Requirements In 13 Cfr 125.18(b), Provided That Any Requirement Therein That Applies To An Sdvo Sbc Is To Be Construed To Apply To A Vip-listed Sdvosb. A Joint Venture Agrees That, In The Performance Of The Contract, The Applicable Percentage Specified In Paragraph (d) Of This Clause Will Be Performed By The Aggregate Of The Joint Venture Participants. (g) Precedence. The Va Veterans First Contracting Program, As Defined In Vaar 802.101, Subpart 819.70, And This Clause, Takes Precedence Over Any Inconsistencies Between The Requirements Of The Sba Program For Sdvo Sbcs, And The Va Veterans First Contracting Program. (h) Misrepresentation. Pursuant To 38 U.s.c. 8127(g), Any Business Concern, Including All Its Principals, That Is Determined By Va To Have Willfully And Intentionally Misrepresented A Company's Sdvosb Status Is Subject To Debarment From Contracting With The Department For A Period Of Not Less Than Five Years (see Vaar 809.406-2 Causes For Debarment). (end Clause)
Closing Date24 Jan 2025
Tender AmountRefer Documents 
3111-3120 of 3129 archived Tenders