Substation Tenders
Substation Tenders
Municipal Corporation Tender
Works
Civil And Construction...+1Road Construction
Eprocure
Corrigendum : Closing Date Modified
India
Details: Development Of Hindu Smashan Bhumi Area At Guljarpura In P No 09 Akola 19) Construction Of Tar & Cc Road At Fadke Nagar From Shri Chopale Complex To Dr. Shri Anant Shravangi To Shri Rande Saheb To Shri Pavar Saheb To Shri Sarag Japulkar Cc Road & Tar Road At Fadke Nagar From Shri Maniram Bhau Tale To Shri Jadhao Kaka Hanuman Mandir Road, At Wankhade Nagar Shri Deshmukh Kirana To Shri Chintvar Saheb To Shri Santosh Chitode To Shri Kale Saheb,rk Chowk To Shri Nanudasji Bhirad Tar Road In P No 9 20) Construction Of Cc Road With Widening From Ashish Gawande To Shri Gajanan Watika And Sanjay Upshyam To Kiran Udgirkar At Godbole Plot , P.no. 10 21) Construction Of Nalla From Adv. Takavale To Kotarwar Beside Balapur Road At Shivnagar ,p.no. 10 22) Construction Of Cc Road From Chittalwar To Thakare At Indira Colony, Dr. Kothari Hosp To Thatange House At Shivaji Nagar, And Construction Of Pavers Infront Of Sai Mandir At Sai Peth , P.no. 10 Construction Of Compound Wall With Gate At Hanuman Mandir ,godbole Plot ,p.no. 10 23) Construction Of Compound Wall With Gate At Hanuman Mandir ,godbole Plot ,p.no. 10 24) Construction Of Cc Road With Pavers From Sawarkar To Joshi ,at Renuka Nagar , P.no. 10 25) Construction Of Cc Road With Widening From Shri Sudhir Deshpande To Lande Guruji At Godbole Plot , P.no. 10 26) Construction Of Cc Road Infront Of Passport Office Infront Of Savatram Mill Tajnapeth Post Office ,in P.no. 11 27) Construction Of Cc Road Adjoining Passport Office To Ramesh Puri Hotel To Aruna Tea House, Infront Of Savatram Mill Tajnapeth Post Office ,in P.no. 11 28) Construction Of Cc Road Infront Of Omkar Appa Dehankar's Shop To Advocate Pancholi's House At Malipura ,in P.no. 11 29) Construction Of Tar Road From Shrikrushna Printer To Old Cotton Market Main Road At Khetan Jin In P.no.11 30) Construction Of Cc Culvert At Malipura Chowk Telipura Road Near Chowrasiya Medical In P.no. 11 31) Construction Of Cc Road From Gandhi Chowpati Shah Medical To Mata Mandir Main Road In P.no. 11 32) Construction Of Cc Nalla From Santoshi Mata Chowk To P.n.enterprizes To India Motor Shop To Hanman Mandir To Public Toilet In P.no.11 33) Construction Of Cc Drain And Cover Of Ganpati Viserjan Marg From Oswal Bhavan Culvert Futanwala To Sadhuram Tolaram Jin And Fixing Steel Cover Near Dana Bazar Infront Of Jain Mandir In P.no.11 34) Construction Of Nallah (coming From Ambedkar Nagar) From 33 Kv Electric Substation Behind Iti College To Azhar Hussain College, Ratanlal Plot Road In P.no.12. 35) Construction Of Tar Road From Dr Dhawale Hospital To Khan Forte At Patrakar Colony, New Bus Stand Road In P.no. 12. 36) Construction Of Drain From Officers Club Lane (vishwakarma Bunglow) To Collector's Residence, Civil Line Road In P.no.12. 37) Construction Of Bridge & Protection Wall To Nala Near Balaji Mall With Road Widening At Kholeshwar Road In P.no.12. 38) Construction Of Nallah From Shri Lohakpure To River,at Anikat Square, Kholeshwar Road In P.no.12.76) Construction Of Cc Drain From Ramaai Appartment To Shivraj Appartment At Om Housing Society In P No 15 77) Construction Of Cc Road From Shri Sapkal House To Shri Kulkarni House At Vijay Housing Society In P No 15 78) Construction Of Tar Road From B T Deshmukh House To Kulsundar House At Vijay Housing Society In P No 15 79) Construction Of Tar Road From Divakar Gawande To Shri Chaube House In P No 15 80) Construction Of Tar Road From Ddr Office To Bobade Dairy In P No 15 81) Construction Of Cc Road From Shri Shah To Mundada To Sayani House At Vidya Nagar In P No 15 82) Construction Of Tar Road From Kedia House To Sindur Next Appartment In P No 15 83) Construction Of Cc Drain From Ratnaparkhi House To Aamale House At Nagar Parishad Colony In P No 15 84) Construction Of Cc Road Rammai Appartment (infront Of Jagdamba Mata Mandir) To Shivraj Appartment At Om Housing Society In P No 15 85) Construction Of Chainlink Fencing Compound To Open Space At Vijay Housing Society In P No 15 86) Construction Of Cc Approach Road Gaurakshan To Vidya Nagar From Shri Varhade Sir To Shreeji Heights At In P No 15 87) Construction Of Compound Wall And Providing And Fixing Open Gym Equipments Near Kunbi Samaj Mandal Open Space In P.no.15 88) Providing And Fixing Open Gym Equipments At Harish Ashwini Colony Open Space In P.no.15 89) Construction Of Cc Drain From Shrimati Kiran Praful Kale House To Kulswamini Mangal Karyalay To Rahul Sawaji Appartment To Chakradhar Appartment In P No 15 90) Construction Of Cc Drain Behind Greenland Hotel Goldenpam Appartment To Kothari To Navalseth Jain House At Vidya Nagar In P No 15 91) Construction Of Cc Compound And Fixing Paving Block At Kailash Tekdi Babaji Math In P No 16. 93) Construction Of Tar Road From Shri. Shashikant Tiwari House To Khandelwal Duplex To Shri. Sharma House Near Nisarga Park Main Road , In P.no. 18 94) Construction Of Tar Road From Shri. Sidhara House Tulshan House To Shri. Ravi Patel House And Shri. Nareshkumar Ganatra House To Shri. Bilala House At Geeta Nagar , In P.no. 18 95) Construction Of Sabhagruh In Front Of Kisanpuri Maharaj Mandir At Old Hingna In P.no 18 96) Construction Of Chain Link Compound Wall At Ch. Shivaji Maharaj Statue At Somthana In P.no. 18 97) Construction Cc Road From Shri. Sharma House To Shri. Shetre Sir House At Emrald Colony In P.no 18 98) Construction Cc Road With Culvert Near Maharana Pratap Chowk At Shivsena Vasahat In P.no 18 99) Construction W.b.m Road With Drain From Auto Stop To Shri. Dubey H. To Main Nalla At Shivsena Vasahat In P.no 18 100) Construction Cc Road From Shri. Kacholiya House To Shri. Gwalani House At Geeta Nagar In P.no 18 101) Providing & Fixing Pavers From Biyani Foods To Shani Maharj Mandir And Jalaram Socity To App. At Geeta Nagar, In P.no. 18 102) Construction Cc Drain From Gurushrichand App. To Shri. Gandhi House To Shri. Balu Asware House At Geeta Nagar In P.no 18 103) Providing & Fixing Pavers From Shri. Joshi House To Shri. Pancholi House At Geeta Nagar, In P.no. 18 104) Construction Cc Road With Drain 1) Shri. Dilip Shinde House To Shri. Sagar Jamode H. 2) Neeta Gomase H. To Shri. Santosh Kharate House 3) Shri. Pawan Thakre H. To Shri. Ranjeet Bendre H. 4) Kailash Kirana To Shri. Dinkar Leknar H. 5) Shri. Sanjiv Navthale To Pooja Mapari 6) Bhatkar Kirana To Shri. Sanjay Ketkar House At Shivsena Vasahat In P.no 18 105) Construction Cc Road From Shri. Lakshman Farkade House To Shri. Vasudev Sarode House At Somthana In P.no 18 145) Construction Cc Nalla From Pkv To Shri. Kanojiya House To Nisarga Park App. At Geeta Nagar In P.no 18 106) Construction Of Cc Nalla From Shri Patil House To Shri Kishor Kale House At (lahariya Nagar) In P.no.19 109) Construction Of Cc Road From Dahake House To Shrinath House At Dreamcity In P.no. 19 110) Construction Of Cc Road From Dhore House To Bambatkar House At Sandhya Colony In P.no. 19 111) Construction Of Tar Road From Shri Tembhe To Sapkal And Shri Dahale To Jogi House At Dreamland City In P.no.19 112) Construction Of Cc Drain From Shri Dhote House To Shri Hanumate House At Rajeshwar Nagar In P.no.19 113) Construction Of Tar Road From Shri Chikte House To Shri Sharma House At Gayatri Nagar In P.no.19 114) Construction Of Tar Road From Shri Gyaral To Ingale House At Gayatri Nagar In P.no.19 115) Construction Of Cc Drain From Shri Damodar Ade To Shri Chavhan House At Banjara Nagar In P.no.19 116) Construction Of Cc Drain From Shri Subhash Chavhan To Shri Ramdhan Ade House At Banjara Nagar In P.no.19 117) Construction Of Cc Drain From Shri Rathod To Shri Waman Rathod House At Banjara Nagar In P.no.19 118) Construction Of Cc Drain From Shri Mankar House To Shri Kashiram Daberav House Near School Of Scholar In P.no.19 119) Construction Of Bridge And Railing At Balode Layout Near Ram Mahalle House In P.no.19 120) Construction Of Chainlink Fencing At Kaulkhed Smashanbhumi In P.no. 19 121) Construction Of Cc Drain From Shri Sakhar Pohe House To Shri Pappu Chavhan House (gayatri Nagar) In P.no.19
Closing Date3 Jan 2025
Tender AmountINR 105.7 Million (USD 1.2 Million)
National Institutes Of Health Tender
Others
United States
Description: This Is A Sources Sought Notice. This Is Not A Solicitation For Proposals, Proposal Abstracts, Or Quotations. The Information Provided In This Notice Is Subject To Change And In No Way Binds The Government To Solicit For Or Award A Contract. The Government Will Not Provide Debriefs On The Results Of This Research, But Feedback Regarding The Decision To Set Aside Or Not Set Aside The Procurement Will Be Accomplished Via Pre-solicitation Synopsis Or Solicitation For These Services, As Applicable. All Information Submitted Will Be Held In A Confidential Manner And Will Only Be Used For The Purpose Intended. Points Of Contact Listed May Be Contacted For The Purpose Of Verifying Performance.
the Purpose Of This Notice Is To Obtain Information Regarding: (1) The Availability And Capability Of Qualified Business Sources; (2) Whether The Businesses Are Sba Certified Hubzone Small Businesses; Sba Certified 8(a) Small Businesses; Service- Disabled Veteran-owned Small Businesses; Woman-owned Small Businesses; Or Large Business And (3) The Respective Businesses Size Classification Relative To The North American Industry Classification System (naics) Code For The Proposed Acquisition. Your Responses To The Information Requested Will Assist The Government In Determining The Appropriate Acquisition Method, Including Whether A Set-aside Is Possible.
the Office Of Research Facilities (orf), The National Institutes Of Health (nih) Is Seeking Capabilities From All Categories Of Businesses For The Purpose Of Determining The Appropriate Level Of Competition And/or Small Business Subcontracting Goals For A New Requirement For An Indefinite Delivery Indefinite Quantity (idiq) Architect-engineer (ae) Multiple Award Task Order Contract (matoc) And A Blanket Purchase Agreement (bpa).
the Ae Matoc Contract Has An Anticipated Composite Value Of $400m. The Applicable North American Industry Classification System (naics) Code Is 541330 (engineering Services) And The Small Business Size Is $25.5 Million. Nih Anticipates Awarding Multiple Contracts Under The Ae Matoc For The Future Professional Architect Engineering (ae) Services, As Well As Multiple Award Blanket Purchase Agreements For Other Professional Services Of An Architectural Or Engineering Nature Or Service Incidental There To (including Studies, Investigations, Surveying And Mapping, Tests, Evaluations, Consultations, Comprehensive Planning, Program Management, Conceptual Designs, Plans And Specifications,value Engineering,constructionphase Services, Soils Engineering, Drawing Reviews, Preparation Of Operating And Maintenance Manuals And Other Related Services) That Logically Or Justifiably Require Performance By Registered Architects Or Engineers Or Their Employees. All Services Will Be Procured In Accordance With The Brooks A/e Act (public Law 92-582, As Implemented In Federal Acquisition Regulation (far) Part 36.6). All Capable Small Business Contractors Are Highly Encouraged To Respond To This Announcement, So That Nih Can Properly Evaluate Your Capabilities To Properly Develop Our Requirements.
the Bpas Have An Estimated Composite Value Of $100m. The Applicable North American Industry Classification System (naics) Code Is 541330 (engineering Services) And The Small Business Size Is $25.5 Million. Nih Anticipates Awarding Multiple Contracts Under The Bpas For Future Other Professional Services Of An Architectural Or Engineering Nature. Services Will Be Procured In Accordance With The Brooks A/e Act (public Law 92-582, As Implemented In Federal Acquisition Regulation (far) Part 36.6). All Capable Business Contractors Are Highly Encouraged To Respond To This Announcement, So That Nih Can Properly Evaluate Your Capabilities To Properly Develop Our Requirements.
background: As Part Of The U.s. Public Health Service Under The Department Of Health And Human Services, Nih Is The Federal Government's Primary Biomedical Research Agency. The Nih Office Of Research Facilities (orf) Is The Steward Of Nih Facilities And Is Responsible For The Planning, Design, Construction, Acquisition, Maintenance, And Operation Of Nih Owned Facilities, Which Includes:
1) Nih Main Campus, Bethesda, Maryland
2) Nih Animal Center, Poolesville, Maryland
3) Fort Detrick Campus, Frederick, Maryland
4) Research Triangle Park, North Carolina
5) Rocky Mountain Laboratories (rml), Hamilton, Montana
6) Epidemiology & Clinical Research Branch, Phoenix, Arizona
7) Bayview Campus, Baltimore, Maryland
8) Rental Facilities Maintained By Nih
description Of The Requirement: The Nih Anticipates Awarding Multiple Aematoc Awards Under A Single Solicitation Utilizing A Task Order Mechanism. Each Idiq Will Be Awarded For A Five (5) Year Performance Period With A Cumulative Maximum Not-to-exceed Dollar Amount Of $400m.
the Nih Also Anticipates Awarding Multiple Bpas Under A Single Solicitation Utilizing A Call Order Mechanism. Each Bpa Will Be Awarded For A Five (5) Year Performance Period With An Estimated Dollar Amount Of $100m.
the Nih Seeks Highly Qualified Credentialed Contractors With Capability To Perform The Ae Matoc And/or Bpas, Which Will Include Various Simultaneous Task Orders And/or Calls. The Selected Contractors Shall Exhibit Demonstrated Experience, Capability And Resources Enabling Them To Provide Specialized A/e Services, Commissioning Support Services, Cqm Services, And Other A/e Related Services Critical To Orf’s Success In Planning, Alteration, Renovation, And New Construction Of Nih Facilities And Associated Infrastructure For Projects Of Similar Size And Complexity With Comparable Clients, And Most Significantly With A Proven Track Record Of Performing Such Projects With A High Degree Of Customer Satisfaction.
contractors Responding To This Notice To Perform The Contract As Small Business Joint Venture Shall Use The Procedure Described At The Small Business Administration (sba) Web Site. The Sba Url Is: Https://www.sba.gov/federal-contracting/contracting-assistance-programs/joint-ventures. Responding Contractors Shall Have Current Information With The System For Award Management (sam), At Www.sam.gov, And Must Not Be Excluded From Government Contract Award At The Time Of Submission.
projects May Include, But Are Not Limited To The Following Areas:
animal Care Facilities – To Include, But Not Limited To, Facilities For Housing, Care, And Use Of Animals In Experimental Testing, Research, And Training As Related To Biomedical Research. Animals Used At Nih For Research Include But Are Not Limited To Mammals Of All Sizes, Including Primates, And Aquatic Animals.
biomedical Research Laboratory / Laboratory Facilities – To Include, But Not Limited To, General And Specialized Biomedical And Animal Research Laboratories, Laboratory Support Spaces, Laser Laboratory, And Electron Microscopes. Projects Related To Lab Facilities In This Contract Will Include General And Bio-safety Levels (bsl) -2, -3, And -4.
health Care Facilities Or Hospitals – To Include, But Not Limited To, Patient Care Units, Outpatient Clinics, Intensive Care Units, Surgical Suites With Catheterization Laboratory, Radiology, Nuclear Medicine, And Mri Suites, Pharmacy, Rehabilitation, Transfusion Medicine, Cyclotron, Radiation Oncology, Medical Gas Services, Pediatrics, And Hospital Support Services.
office / Public Space Facilities – To Include, But Not Limited To, Offices, Sensitive Compartmented Information Facilities (scif), Training Facilities, Conference Facilities (including Natcher Conference Center), Libraries (including The National Library Of Medicine), Child Development Centers, Residences And Lodging, Commercial Shops And Food Services, Wellness Centers And Gyms, Recreational Facilities, Facilities For Ancillary Services Such As Fire And Police, Parking Structures, And Exterior Improvements Such As Roadways, Sidewalks, And Landscaping.
interior And Exterior Utility Infrastructure And Utility Generation Distribution Systems - The A/e Services Include The Design Of Interior & Exterior Utility Infrastructure And Systems For Office / Public Facilities; Animal Care Facilities; Bio-medical Research Laboratories; Healthcare /hospital Facilities; And General-purpose Facilities Such As Parking Structures And Warehouses. The Utility Interior & Exterior Infrastructure And Generation & Distribution Systems Include, But Are Not Limited, To The Following:
mechanical, Electrical, And Plumbing Systems.
high Voltage Electrical
central Utility Plant (cup)
hvac Systems To Include Specialized Filtering Requirements, Supply And Exhaust Systems And Associated Controls.
steam/condensate, High Temperature Hot Water, Heating Hot Water, Chilled Water, Lab Water, High Purity Water, And Potable Water Systems.
compressed Air, Medical Gas, Lab Vacuum, And Material Gas Systems.
central Co2 Systems.
central Liquid Nitrogen Systems.
fuel Oil Systems.
storm Water And Sanitary Sewer Distribution Systems.
wastewater Treatment Systems.
electrical Substations.
landscaping Irrigation Systems.
commissioning
commissioning, Qualification, And Validation (cqv)
historical
geotechnical
elevator
physical Security
interior / Exterior Lighting
telecommunications
building Envelope
roofing
building Model Information (bim)
net Zero Emissions
this Idiq Shall Support Projects In Maryland, North Carolina, And The Montana Locations.
maryland Facilities Include:
nih Main Campus, Bethesda, Md
nih Animal Center, Poolesville, Md
fort Detrick Campus, Frederick, Md
bayview Campus, Baltimore, Maryland
rental / Leased Facilities Maintained By Nih
it Is Anticipated That A Majority Of The Facilities Under This Idiq Will Be Located On The Nih Main Campus, Bethesda, Md, Followed By The Other Surrounding Areas. Therefore, The A/e Shall Maintain An Office Within Fifty (50) Miles Of The Baltimore - Washington, Dc Metropolitan Area For The Duration Of The Idiq Contract.
research Triangle Park, North Carolina
for Projects In North Carolina, The A/e Shall Plan To Maintain Local Presence Within Fifty (50) Miles Of The Nih Research Triangle Park Campus For The Duration Of The Project.
rocky Mountain Laboratories (rml), Hamilton, Montana
for Projects In Montana, The A/e Shall Plan To Maintain Local Presence Within One Hundred (100) Miles Of The Rocky Mountain Labs Campus For The Duration Of The Project.
architect / Engineer Services
the A/e Shall Furnish All Labor, Management, Investigations, Studies, Travel, Supplies, Equipment, And Materials To Perform The Required Services. The A/e Is Responsible For Determining What Disciplines And Skill Sets Are Required For Accomplishing The Work And Form A Team Accordingly.
in General, Pre-design And Design Phase Services Will Include, But Not Limited To:
field / Site Investigations, Inclusive Of Pre-tab Investigations
planning And Coordination Drawings
building Information Modeling (bim) (only If Applicable To The Task Order)
sustainable Design
program Of Requirements (pors)
special Studies
schematic Design
design Development
construction Documents (65%)
construction Documents (95%)
construction Documents (100%)
rendered Perspectives Of Proposed Building Construction And Substantial Site Development
construction Cost Estimate(s)
construction Baseline Schedule
geotechnical Investigations
preparation Of Reports
the A/e May Be Required To Provide Construction Phase And Other Services Including, But Not Limited To:
construction Bidding And Negotiation Support
construction Inspections / Site Representation
construction Progress Meetings
requests For Information (rfis)
construction Submittal Reviews
change Order Reviews / Support
punch Lists
inspection Of Stored Items
construction Close-out Support Including As-builts; Record Documents; Non-compliance Notices; Operation And Maintenance (o&m) Manuals; Warranties; Product And Equipment Demonstrations And Training.
a/e Record Documents
commissioning Support Services
commissioning Support Services (cx) Shall Perform, But Not Limited To, The Following Tasks:
review Specifications And Drawings
review Submittals
develop Commissioning Scripts
review O & M Manuals
witness Testing Of Electrical And Mechanical Systems
construction Quality Management (cqm)
general Project Management - To Include, But Not Limited To, Provide Administration And Management Services To Assist The Contracting Officer’s Representative (cor) In The General Day-to-day Administration Of The Overall Project.
project Governance
preparation And Maintenance Of A Project Management Plan (pmp)
assist In The Implementation Of The Project Governance Structure
reviews And Document Management
monthly Reports
requests For Information (rfi)
submittals
financial Management
budget/cost Control Monitoring And Management
invoices / Application For Payment Review
change Order Control Process And Management
estimating Services
scheduling Support – Regularly Review, Analyze, And Monitor The Dbb/dbcs Performance Schedule(s), Including, But Not Limited, To The Preliminary/baseline Schedule, Critical Path Method (cpm) Construction Schedules, And Fragnets, As Required.
quality Construction Management, Reviews And Administration Assistance - Shall Include Inspections, Verifications, Details Audits And Evaluations Of Materials And Workmanship Necessary To Determine And Document The Quality Of Construction. The Cqm Contractor Shall Use Its Expertise And Knowledge Of Construction Practices, Means And Methods To Execute An Effective Quality Assurance Program.
potential Sources Shall Complete And Submit The Attached Forms:
sources Sought - Contractor Information Form
1.1 Complete The Sources Sought – Contractor Information Form
if Applicable, Interested 8(a) Small Business Firms Shall State Their Current 8(a) Certification Data With The Small Business Administration
if Applicable, Interested Hubzone Small Business Firms Responding Must Provide Proof Of Their Hubzone Certification Status.
certificate Of Insurance
1.2 Interested Firms May Include A Capability Statement As An Attachment To The Sources Sought – Contractor Information Form. Capability Statement Shall Be No Longer Than Ten (10) Pages. Potential Sources’ Experience Shall Demonstrate And Document The Following The Capability Statement:
naics Code(s)
evidence Of The Ability To Work In Occupied Space.
evidence Of The Ability To Work On Multiple Projects Simultaneously.
evidence Of The Ability To Perform The Work Described In The Sources Sought – Project Data Form Section Below.
self-performance Capability (contractor Shall Self-perform At Least 15% Of Each Task Order).
building Information Modeling (bim) Capability.
leed Capabilities.
2. Sources Sought – Project Data Form
2.1 Complete The Sources Sought – Project Data Form For No More Than Five (5) Example Projects Performed Within The Last Five (5) Years, Or In Progress, Which Best Demonstrates Your Firm’s Specialized Experience Providing A/e Services On Projects Of Similar Type, Size, And Complexity To The Nih Requirement, As Defined Below. Each Completed Sources Sought – Project Data Form Shall Not Exceed Three (3) Pages And Shall Contain At A Minimum The Following Types Of Project Experience:
one (1) Utility Infrastructure / Utility Generation /distribution System Projects
one (1) Biomedical Research Lab; And
one (1) Healthcare / Hospital Project.
[note - An Indefinite Delivery Indefinite Quantity (idiq) With Multiple Task Orders Is Not Considered A Project. Each Individual Task Order Executed Under An Idiq Contract Is Considered A Project.]
2.2 Project Experience Requirements:
type - Specialization Category/facility Types Such As:
interior & Exterior Utility Infrastructure And Utility Generation & Distribution Systems
biomedical Research Laboratory Facilities
health Care Facilities
office/public Space Facilities
animal Care Facilities
2. Complexity - Special Design/construction Considerations Such As:
physical Security Requirements
adjacencies To Occupied Space(s) Restrictions/ Limitations
limited Access Restrictions
vibration / Noise Limitations
joint Commission (for Hospitals) Requirements (i.e. Special / Interim Life Safety Measures, Construction Risk Assessments)
implementing Guiding Principles For Sustainable Federal Buildings And Leadership In Energy And Environmental Design (leed) Criteria
special Mep Features - I.e. Designed For Infectious Or Immune Compromised Areas Within A Hospital Space.
historic Preservation Requirements
storm Water Management And Erosion & Sedimentation Control
use Of Building Information Modeling (bim)
net Zero Emission Requirements
for All Patient Care Support Spaces: Compliance With The Facilities Guidelines Institute (fgi) For Healthcare Projects And Most Current Healthcare Facility “statement Of Conditions” (sco).
nih Design Requirements Manual (drm)
3. Size - Contractors Shall Have The Experience, Capability, And Resources Necessary To Perform Simultaneous/concurrent Projects Of Varying Size (between $25,000 To $20,000,000) And Complexity, As Described Above.
all Qualified Interested Firms Are Requested To Submit An Electronic Copy Of Their Completed Letter Of Interest, Qualification Statement, And Capability Statement (in One Combined Pdf Format), Via Email, To The Contracting Officers, Ms. Magan Miller At: Magan.miller@nih.gov And Ms. Ana Marie Pagulayan At: Anamarie.pagulayan@nih.gov. The Submission Shall Be Received On Or Before By 12:00 Noon, Est On Friday, January 24, 2025. The Email Subject Line Shall Read: Sources Sought 2025 Matoc Qualification Statement For Architect / Engineer Services. Inquiries Shall Be Submitted Via E-mail To Magan Miller At: Magan.miller@nih.gov And Ana Marie Pagulayan At: Anamarie.pagulayan@nih.gov. Electronic Mail Inquiries And Submissions Will Only Be Accepted.
Closing Date24 Jan 2025
Tender AmountRefer Documents
Stadt Rheinsberg Tender
Civil And Construction...+1Civil Works Others
Germany
Details: The primary school of the Rheinsberg educational campus is located at Kiefernweg 5 in 16381 Rheinsberg. The primary school's sports hall is still located on the site, but is not the subject of this renovation measure. The property is of the Erfurt Ts 66/69 building type with a gross floor area of approx. 3,834 m². The school building consists of two wings that are connected to one another by a crossbar. The maximum dimensions of the school building are approx. 58.78m in the crossbar at its greatest extent and approx. 31.76m in depth. The property can be divided into 3 building sections: Part A: Large crossbar Part B: Connector Part C: Small crossbar The school building has four above-ground floors in part A (ground floor to 3rd floor). The connector (part B) and part C consist of 3 above-ground floors (ground floor - 2nd floor). Only part C of the school building has a full basement. This is where the heat supply handover point is located as a substation. The main connection for the district heating is in the sports hall. From there, the school is supplied via a heat route. The basement area can be reached via one of the stairwells. In part C of the building, the previous main drinking water connection for supplying the building is located under the stairs. Parts B and C of the building only have one crawl space. This is where the supply lines for the drinking water and heat media for these sections of the building are brought in, as well as the disposal lines for the waste water. The waste water is led out of the building via a short route. The school has a total of 5 connection points to the drainage network (3 in part C and 2 in part A). The following measures are to be implemented using the materials advertised: - Complete renewal of the heat transfer incl. Control - Maintaining the pressure of the secondary network - Renewing the heat distribution network - Replacing the radiators and control - Decentralized hot water supply - Reinstalling the cold water network - Reinstalling the wastewater system - Installing a grease separator/lifting system - Installing a lifting system for new toilet areas - Building new toilet rooms for students and teachers - Ventilating windowless areas - Kitchen ventilation - Dismantling and demolition work for old supply technology in the HLS trade (including distribution networks, risers and connecting lines, as well as objects), including partition walls/toilet partitions - Disposal of rubble materials or objects The conversion of the school will take place while operations are ongoing. For the most part, the holidays are to be used for the essential measures. However, it is essential to use the opportunity (outside of class times) to carry out preparatory work during the school year before the holidays. All system components are to be installed and functional when school starts in September 2025. Corresponding impairments during construction must be planned for and do not entitle the customer to make additional demands. Freedom to build is ensured by clearing the respective construction phase. The preliminary acceptance takes place after the project has been completed. The client is expected to cooperate appropriately in the coordination by the contractor. Constant attendance at construction meetings is required for all trades. A pollutant report is not yet available. Insulation materials containing pollutants (insulation containing KMF) are suspected to be in the crawl space. Personal protective equipment should be used for short-term work or when staying in the crawl space. A health check to determine suitability for work in the black area must be presented from the beginning.
Closing Date14 Jan 2025
Tender AmountRefer Documents
1171-1180 of 1173 archived Tenders