Solar Tenders
Solar Tenders
Batangas State University Tender
Others
Philippines
Details: Description Republic Of The Philippines Batangas State University Batangas City Request For Quotation "procurement Of Various And Equipment For Central Offices (office Supplies)" 1. The Batangas State University (batstate U) Through The Bids And Awards Committee Invites Interested Firms/supplier To Submit Quotation For The Project "procurement Of Various And Equipment For Central Offices (office Supplies)" With An Approved Budget For The Contract (abc) Seven Hundred Twenty-seven Thousand Eight Hundred Six Pesos And Ten Centavos Only (php 727,806.10). Quotation Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening. Item No. Qty Description Total 1 15 Piece Arch File Folder Arch File Folder 8.5x13 2,160.00 2 133 Ream Bond Paper A4, 80gsm, Size: 210mm X 297mm, 500 Sheets Per Ream 33,375.02 3 16 Ream Bond Paper Multi-purpose Size: A3 Thickness: 80gsm Others: 420mm X 297mm 11,200.00 4 53 Ream Bond Paper Multi-purpose Size: Short (8.5 X 11) Thickness: 80gsm 12,084.00 5 205 Ream Bond Paper Multi-purpose (copy), 70gsm, Long (8.5 X 13), 500 Sheets Per Ream 48,482.50 6 69 Ream Bond Paper Multi-purpose (copy), A4, 70gsm, 500 Sheets Per Ream 14,421.00 7 734 Ream Bond Paper Long Size: Long (8.5 X 13) Thickness: 80gsm 196,469.78 8 110 Piece Brown Envelope Long 650.10 9 5 Piece Cutter S Cutter 15cm 195.00 10 10 Pack Cable Tie 10" 2,280.00 11 2 Unit Calculator Specs: • Power Supply: Solar & Battery • Number Of Digits: 12 Digits • Size (d × W × H): 147 × 106.5 × 29 Mm 700.00 12 10 Piece Chalk Marker (white) Bullet Tip 1.8mm-2.5mm Color: White 1,815.00 13 11 Pack Clear Sheet Protector Size: 8.5 X 13 100 Sheets Per Pack 4,235.00 14 2 Piece Clearbook 20 Transparent Pockets, For A4 Size, Refillable 80.00 15 24 Piece Clearbook 20 Transparent Pockets, Legal, Refillable 1,296.00 16 5 Piece Click Gel Ballpen Black 210.00 17 56 Box Clip Backfold (binder Clip) All Metal, Clamping, 32 Mm (-1mm) / 1 1/4", 12 Pcs Per Box 2,402.40 18 59 Box Clip Backfold (binder Clip) All Metal, Clamping, 19mm (-1mm) / 3/4, 12 Pieces Per Box 1,362.90 19 47 Box Clip Backfold (binder Clip) All Metal, Clamping, 25mm (-1mm) / 1", 12 Pieces Per Box 1,410.00 20 6 Box Clip Backfold (binder Clip) All Metal, Clamping, 41mm (-1mm) / 1 5/8", 12 Pcs Per Box 336.00 21 61 Box Clip Backfold (binder Clip) All Metal, Clamping, 50mm (-1mm) / 2", 12 Pcs Per Box 5,233.80 22 2 Piece Clipboard Size: 8.5 X 13 Plastic Material 168.00 23 5 Piece Correction Tape Correction Tape 5mm X 8m 5mm Wide 8m Long Clear Casing 145.00 24 14 Piece Cutter Small 140.00 25 5 Piece Cutter/utility Knife For General Purpose 550.00 26 148 Piece Data File Box Made Of Chipboard, With Closed Ends 32,560.00 27 3 Piece Desk Organizer Stainless Steel Metal Mesh Pen 450.00 Page 1 Of 6 Item No. Qty Description Total And Supplies Holder Desk Organizer 28 2 Box Diazo Paper 20 X 30 (660 Sheets) 17,000.00 29 2 Piece Document Tray Home Office Organizer -4 Slot Horizontal Document Tray - A4 Table Tray Stationery File -desk Drawer Container Holder Shelf Case Desktop 2,000.00 30 33 Piece Double Sided Tape Foam Type, 1/2" 1,980.00 31 33 Piece Double Sided Tape Width Size: 1/2 1,824.90 32 11 Box Envelope Brown, Expanding, Kraft, Legal, 100 Pieces Per Box 17,847.50 33 3 Box Envelope Documentary, For A4 Size Document, Brown, 500 Pieces Per Box 3,894.00 34 10 Box Envelope Documentary, For Legal Size Document, Brown, 500 Pieces Per Box 14,300.00 35 2 Box Envelope Mailing, White, With Window 1,650.00 36 25 Piece Envelope Brown, Expandable, Legal 600.00 37 19 Piece Envelope Expanding, Plastic, 0.50mm Thickness Min 912.00 38 20 Piece Envelope Vertical Envelope White Or Cream 12" X 9" 150.00 39 4 Piece Eraser Felt, For Blackboard/whiteboard 80.00 40 41 Piece Eraser Plastic Or Rubber 820.00 41 59 Box Fastener Fastener, Metal,non-sharp Edges, 70mm Between Prongs, 50 Sets Per Box 5,605.00 42 20 Set File Tab Divider Bristol Board, A4 560.00 43 31 Box Folder Folder, Pressboard, Size: 240mm X 370mm (-5mm) Color: White With Green 61,380.00 44 1 Pack Folder Folder With Tab Size: A4 100 Pcs Per Pack 632.50 45 28 Pack Folder Folder With Tab Size: Legal 100 Pcs Per Pack 18,480.00 46 2 Pack Folder L-type, Plastic, For Legal Size Documents, 50 Pieces Per Pack 990.00 47 90 Piece Folder Expandable Long,color: White With Green 1,800.00 48 20 Piece Folder Ordinary, Long, Tagboard 140.00 49 1 Box Gel Pen Type Of Pen: Gel Ink Color: Blue Others: 0.5 Mm 600.00 50 53 Pack Glossy Photo Sticker Paper -a4 210x297 Mm -20 Sheets -135gsm. -5760dpi 6,360.00 51 2 Bottle Glue All, Purpose, Gross Weight : 130 Grams Min 140.00 52 17 Jar Glue All Purpose, Gross Weight: 200 Grams Min. 2,040.00 53 5 Piece Glue 240ml 750.00 54 4 Piece Glue Gun Small 560.00 55 50 Piece Glue Stick Small 350.00 56 15 Piece Highlighter Liquid Chalk Marker Pens Package Quantity:1pcs Size:3mm 6mm Color:green Red Blue Pink Orange Purple Yellow White Note: Cap Design, Comes With A Pen Holder, Simple And Stylish Easy To Carry, Easy To Damage, Good Sealing. Pen Style Design, Round High-strength Pen, Compression And Depression, So Feel More 975.00 Page 2 Of 6 Item No. Qty Description Total Comfortable. Pigment-type High-quality Fluorescent Ink, The Color Is Beautiful And Easy To Dry Ink Does Not Fade. 57 122 Piece Lever Arch File Data Folder Made Of Chipboard, Taglia Lock 17,446.00 58 4 Piece Lever Arch File Binder Long - 3 Inches Color: Blue 576.00 59 40 Piece Lever Arch File Binder Long - 3 Inches Color: Red 5,760.00 60 1 Bundle Looseleaf Cover Made Of Chipboard, Thickness: 1.5mm, For Legal Size Documents, Capable Of Filing Minimum Of 45mm Thickness Of 70gsm Paper, 50 Sets Per Bundle 2,310.00 61 9 Piece Marker Whiteboard, Blue, Bullet Type 540.00 62 3 Piece Marker Whiteboard, Red, Bullet Type 180.00 63 15 Piece Magazine File Box Large Size, Made Of Chipboard 1,980.00 64 2 Box Mailing Envelope Mailing, White, 80gsm (-5%) 1,386.00 65 88 Piece Mailing Envelope White 264.00 66 2 Box Marker Whiteboard, Blue,12 Pcs Per Box 1,200.00 67 43 Piece Marker Permanent, Black, Broad Type 2,064.00 68 24 Piece Marker Permanent, Black, Bullet Type 871.20 69 6 Piece Marker Permanent, Blue, Bullet Type 228.00 70 9 Piece Marker Permanent, Red, Bullet Type 326.70 71 77 Piece Marker Whiteboard, Black, Bullet Type 4,620.00 72 30 Set Marker Fluorescent, 3 Assorted Colors Per Set 2,490.00 73 10 Roll Masking Tape 3/4 300.00 74 6 Piece Memo Folder Size: 14"x9.5" Fabric: Denise Red With Foam Print Process" 1 Color, 1 Side Dtf Print Inside Size: 13.5"x9" Pasteboard: 400 Gsm Fabric: Satin White Memo Corner: Metallic Ribbon 3,900.00 75 36 Pad Note Pad Stick On, 50mm X 76mm (2" X 3") Min 1,944.00 76 41 Pad Note Pad Stick On, 76mm X 100mm (3" X 4") Min 2,665.00 77 70 Pad Note Pad Stick On, 76mm X 76mm (3" X 3") Min, 100 Sheets Per Pad 4,200.00 78 1 Pack Notebook Filler, 50pcs Per Pack 550.00 79 4 Piece Notebook Stenographer, Spiral, 40 Leaves 96.00 80 6 Piece Notepad 50 Leaves Per Pad, 4"x6" 240.00 81 136 Pack Oslo Paper Long 8.5"x13" 10,880.00 82 18 Pack Photo Paper Matte 220gsm 3,240.00 83 1 Piece Puncher Heavy Duty Metal, With Adjustable Paper Guide, With Two Hole Guide 250.00 84 2 Pack Pvc Legal Size 10pc/pack 288.00 85 1 Box Pvc Cover A4, 200 Mic 605.00 86 5 Box Pvc Cover Long, 200 Mic 3,300.00 87 17 Pack Page Markers Assorted Neon, 5 Pads/pack, 100 Markers/pad, 2"x 0.5" 1,700.00 88 61 Box Paper Clip Vinyl/plastic Coated, 33mm, 100 Pcs Per Box 944.89 89 55 Box Paper Clip Vinyl/plastic Coated, 48mm, 100 Pcs Per Box 1,650.00 90 51 Box Paper Clip Vinyl/plastic Coated, 50mm, 100 Pcs Per Box 1,530.00 91 295 Piece Pen Ink Color: Black Tip: 0.5mm, Ballpoint Type 3,540.00 92 10 Piece Pen Ink Color: Black Tip: 0.7mm, Ballpoint Type 120.00 93 9 Piece Pen Ink Color: Blue Tip: 0.5mm, Ballpoint Type 108.00 Page 3 Of 6 Item No. Qty Description Total 94 29 Piece Pen Ink Color: Red Tip: 0.5mm, Ballpoint Type 348.00 95 4 Piece Pen Holder Can Hold Multiple Pens, Markers And Highlighters. Made Of Plastic; Available In White And Dark Blue Item Dimension: 5.5 X 5.5 X 9 Cm 400.00 96 28 Box Pencil With Eraser, 12 Pcs Per Box 2,800.00 97 2 Piece Pencil Lead/graphite, With Eraser 24.00 98 45 Pack Photo Paper Matte 180gsm 4,500.00 99 30 Piece Plastic Envelope Expandable Long Plastic Envelope With Handle And Push Lock 2,400.00 100 6 Box Push Pin Hammer Head Type, 100s / Box 240.00 101 5 Kilogram Rags All Cotton, 1 Kilo Per Bundle Or 32 Pieces Per Kilogram Min 440.00 102 40 Book Record Book Atleast 300 Pages, Size: 214mm X 278mm Min 7,200.00 103 3 Piece Record Book Junior Size 200 Pages 324.00 104 17 Piece Refillable Clear Book Legal Size; High Quality Refillable 3,085.50 105 2 Bundle Ring Bind Element 25mm 8pcs/bundle 512.00 106 10 Piece Ring Bind Element 1/4 360.00 107 10 Piece Ring Bind Element 3/4 360.00 108 26 Piece Ring Bind Element Size: 1/2", Black 546.00 109 36 Piece Ring Bind Element Size: 2, Black 2,376.00 110 56 Piece Ring Bind Element Size:1", Black 2,032.80 111 5 Bundle Ring Binder 80 Rings, Plastic, 32mm X 1.12m Plastic, 32 Mm, 10 Pieces Per Bundle 2,700.00 112 9 Box Rubber Band 70mm Min Lay Flat Length (no. 18), 350g 1,440.00 113 5 Piece Ruler Plastic Ruler 12 Transparent 86.00 114 9 Piece Ruler Plastic, 450mm (18") Width: 38mm Min. 360.00 115 30 Pack Sticker Paper Glossy, A4 1,500.00 116 2 Piece Scissor Heavy Duty, Stainless 844.80 117 1 Piece Scissors Symmetrical, Blade Length: 65mm Min 120.00 118 4 Piece Sign Pen Black, 0.3 Needle Tip, Gel Ink 160.00 119 174 Piece Sign Pen Black, 0.5 Needle Tip, Gel Ink 6,022.14 120 123 Piece Sign Pen Blue, 0.3 Needle Tip, Gel Ink 4,920.00 121 179 Piece Sign Pen Blue, 0.5 Needle Tip, Gel Ink" 6,195.19 122 78 Piece Sign Pen Red, 0.5 Needle Tip, Gel Ink" 2,699.58 123 11 Piece Sign Pen Sign Pen (black, 5mm Needle Tip, Gel Ink) 1,188.00 124 16 Piece Sign Pen Type Of Pen: Sign Pen Color: Black Tip: 1 Mm 2,000.00 125 24 Piece Sign Pen Type Of Pen: Sign Pen Color: Blue Tip: 1 Mm 3,000.00 126 10 Pack Specialty Board Paper Long 8.5 X 13 200gsm 600.00 127 15 Pack Specialty Paper 8.5 X 11 Inches (short) 750.00 128 78 Pack Specialty Paper Size: A4 Color: White Thickness: 90gsm 2,340.00 129 24 Pack Specialty Paper Size: Legal Color: Cream Thickness: 90gsm 1,200.00 130 44 Pack Specialty Paper Size: Legal Size Color: White Thickness: 90gsm Sheets: 10pcs. Per Pack 2,200.00 131 8 Pack Specialty Paper Size:a4 Color:cream Thickness:90gsm 240.00 132 3 Piece Stamp Pad Felt, Bed Dimension: 60mm X 100mm 144.00 133 9 Bottle Stamp Pad Ink Violet, 50 Ml 346.50 134 7 Piece Stamp Pad Ink Red 280.00 135 1 Piece Staple Remover 20.00 Page 4 Of 6 Item No. Qty Description Total 136 9 Piece Staple Remover Plier Type 544.50 137 44 Box Staple Wire Standard, (26/6) #35 1,936.00 138 2 Piece Stapler Size : 125mm X 36mm X 55mm (lwh) Staples: : No. 35 (26/6), No. 3 (24/6) Throat Depth: : 64 Mm Load Capacity : 100 Staples Stapling Capacity : 2-30 Sheets Of 70 G/m2 Paper Color : Blue, Black, And Gray 800.00 139 1 Piece Stapler Compatible With No. 35 Staple Wire Size Stapling Capacity: Up To 30 Sheets With Built-in Staple Remover 385.00 140 69 Pack Sticker Paper Matte, A4 2,898.00 141 108 Pack Sticky Notes Arrow Flags 1/2 Inch Wide Assorted Colors 5 Pads Per Pack 4,489.56 142 39 Pad Sticky Notes Size: 3"x3", 75 To 80gsm Paper 100 Sheets Per Pad Material: Paper, Glue Color: Yellow, Orange Or Green 1,950.00 143 78 Piece Tape Transparent, 24mm 2,933.58 144 28 Piece Tape Double Adhesive Tape, 1" 1,008.00 145 10 Piece Tape Masking,1/2" 400.00 146 10 Piece Tape Masking, 48 Mm 800.00 147 24 Roll Tape Masking Width Size: 1" At Least 50 Yards 1,200.00 148 28 Roll Tape Packaging Width Size: 24mm At Least 50 Yards 1,152.76 149 70 Roll Tape Transparent Type: Clear Width Size: 2 Inches Circumference Size: At Least 50 Yards 3,150.00 150 99 Roll Tape Transparent, 1/2" 1,980.00 151 1 Piece Tape Dispenser Table Top, For 24mm Width Tape 150.00 152 5 Pack Vellum Board - 200gsm; Specialty Board Paper; Acid-free; Size: A3; 10 Sheets/pack 420.00 153 49 Pack Vellum Board - 220gsm - Specialty Board - Vellum Board - Board Paper - Acid-free - Size: Long (8.5"x13") - 10 Sheets/pack 2,695.00 154 5 Pack Vellum Board - 220gsm - Specialty Board - Vellum Board - Board Paper - Acid-free - Size: Short (8.5"x11") - 10 Sheets/pack 250.00 155 49 Pack Vellum Board 220gsm, Specialty Board, Board Paper, Acid-free, A4,10 Sheets/pack 4,116.00 156 5 Pack Vellum Boards Size: A4 150.00 157 6 Pad Yellow Paper 288.00 158 12 Box Black Ballpen Type Of Pen: Ball Point Color:black 1,680.00 Note: Kindly Indicate The Brand On Your Quotation. 2. Philgeps Registration Certificate And Other Business Permits Shall Be Attached Upon Submission Of The Quotation. 3. The Quotation Must Be Submitted (can Also Be Send Thru Fax And Email At The Contact Details Listed Below) Or To The Rizal Avenue Extension, Batangas City And Shall Be Received By The Committee On Or Before 5:00 Pm Of January 20, 2025. Page 5 Of 6 E-mail : Procurement.central.external@g.batstate-u.edu.ph 4. The Bsu Reserves The Right To Reject Any Or All Quotations And/or Proposals And Waive Any Formalities/informalities Therein And To Accept Such Bids It May Consider As Most Advantageous To The Agency And To The Government. Batstate U Neither Assumes Any Obligation For Whatsoever Losses That May Be Incurred In The Preparation Of Bids, Nor Does It Guarantee That An Award Will Be Made. Mr. Jonas Erik L Ebora Assistant Director, Procurement Rizal Avenue Extension, Batangas City 980-0385 Loc. 1230
Closing Date20 Jan 2025
Tender AmountPHP 727.8 K (USD 12.4 K)
Bureau Of Corrections Muntinlupa City Metro Manila Tender
Civil And Construction...+1Building Construction
Philippines
Details: Description Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Philippine Bidding Documents Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (procurement/contract No. 009) Sixth Edition July 2020 Bids And Awards Committee 202 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 6 Section Iii. Bid Data Sheet 13 Section Iv. General Conditions Of Contract 19 Section V. Special Conditions Of Contract 24 Section Vi. Specifications 26 Section Vii. Drawings 59 Section Viii. Bill Of Quantities 60 Section Ix. Checklist Of Technical And Financial Documents 61 Section I. Invitation To Bid Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Invitation To Bid Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) 1. The Bureau Of Corrections, Through The National Expenditure Program (nep) Of 2025 Capital Outlay, Intends To Apply The Sum Of Three Hundred Million Pesos Only (₱300,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) With Identification Number _epa-009__. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bureau Of Corrections Now Invites Bids For Provision Of A Detailed Preliminary Architectural And Engineering Design, Detailed Engineering Requirements And Actual Construction Of The Bureau Of Corrections Super Maximum Security Facility, Based On The Final Detailed Architectural And Engineering Design, To Be Approved By The Head Of Procuring Entity Or Its Duly Authorized Representative Conformably With The Minimum Standards Set Forth In The (1) Presidential Decree (pd) No. 1096, National Building Code Of The Philippines (2) Batas Pambansa (bp)blg. 344, An Act To Enhance The Mobility Of Disabled Persons By Requiring Certain Public Buildings, Institutions, Establishments And Public Utilities To Install Facilities And Other Devices (3) National Structural Code Of The Philippines (nscp), Volume I, 2010 (4) Philippine Electrical Code (pec), 2009 (5) Revised Plumbing Code Of The Philippines (6) Revised Irr Of Ra 10575 (7) Republic Act (ra) No. 9514, Revised Fire Code Of The Philippines And (8) Applicable Local Regulations And Ordinances. Completion Of The Works Is Required Within Three Hundred Sixty-five (365) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project Amounting To At Least Fifty Percent (50%) Of The Abc Within The Last Six (6) Years. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act.” Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Cooperatives, And Partnerships Or Organizations With At Least Seventy-five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From Bureau Of Corrections And Inspect The Bidding Documents At The Address Given Below From Monday To Friday From 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On _december 28, 2024 (08:00am To 05:00pm) To January 20, 2025 (01:29 Pm)_____ From The Given Address And Website(s) Below. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity Bucor.gov.ph, Provided That Bidders Shall Pay The Applicable Fee Of Fifty Thousand (₱50,000.00) Pesos Only For The Bidding Documents Not Later Than The Submission Of Their Bids. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person Or By Facsimile. 6. The Bureau Of Corrections Will Hold A Pre-bid Conference On _january 06, 2025 (01:30pm)__ At Bac Conference Room Nbp Reservation Muntinlupa City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below, On Or Before __january 20, 2025 (01:30pm)_____. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 9. Bid Opening Shall Be On __january 20, 2025 (01:30pm)____ At The Bac Conference Room Nbp Reservation Muntinlupa City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Bureau Of Corrections Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Ma. Adoracion I. Viñas Office Of The Bac Secretariat Supply Office, Bureau Of Corrections, Muntinlupa City Tel # 02-8809-8587/02-8478-0907 Bacsec2022@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Bucor.gov.ph Date Of Issue: _______________ Ccsupt Celso S Bravo Chairperson, Bids And Awards Committee Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Bureau Of Corrections Invites Bids For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf), With Project Identification Number__________________. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 2025 In The Amount Of Three Hundred Million Pesos Only (₱300,000,000.00). 2.2. The Source Of Funding Is: Nga, The National Expenditure Program 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. [if Procuring Entity Has Determined That Subcontracting Is Allowed During The Bidding, State:] The Bidder Must Submit Together With Its Bid The Documentary Requirements Of The Subcontractor(s) Complying With The Eligibility Criteria Stated In Itb Clause 5 In Accordance With Section 23.4 Of The 2016 Revised Irr Of Ra No. 9184 Pursuant To Section 23.1 Thereof. 7.2. [if Subcontracting Is Allowed During The Contract Implementation Stage, State:] The Supplier May Identify Its Subcontractor During The Contract Implementation Stage. Subcontractors Identified During The Bidding May Be Changed During The Implementation Of This Contract. Subcontractors Must Submit The Documentary Requirements Under Section 23.1 Of The 2016 Revised Irr Of Ra No. 9184 And Comply With The Eligibility Criteria Specified In Itb Clause 5 To The Implementing Or End-user Unit. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address At Bac Conference Room Nbp Reservation Muntinlupa City And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty (120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Architectural, Engineering Design, Detailed Engineering Requirements And Construction Of Building With Concreting Works. 7.1 Subcontracting Is Not Allowed 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: For Design Personnel: Key Personnel General Experience Relevant Experience Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience. Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience. Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years’ Experience. Experience In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel: Key Personnel General Experience Relevant Experience Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience. Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. Foreman The Foreman Must Have At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Safety Officer The Sanitary Officer Must Have At Least Two (2) Years’ Experience. Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units Backhoe At Least 38hp With 0.055 To 0.160 M3 Bucket Capacity 1 Pay Loader At Least 2.5 To 9.5 M3 Bucket Capacity 1 Dump Truck At Least 10 Cu.m. 2 Generator 50kva 1 Concrete Mixers 1 Bagger 4 Welding Machines 300amp Heavy Duty 4 Submersible Dredging Pump At Least 1hp And 2” Output 1 Prospective Bidders Shall Attach The List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be. 12 No Further Instructions. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than 2% Of The Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less Than 5% Of The Abc, If Bid Security Is In Surety Bond. 19.2 No Further Instructions. 20 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its; 1. Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) 2. Supporting Documents For The Slcc (notice Of Award And/or Notice To Proceed And Project Owner’s Certificate Of Final Acceptance Issued By The Owner Other Than The Contractor Or The Constructors Performance Evaluation System (cpes) Final Rating, Which Must Be At Least Satisfactory. In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted) 3. Certified True Copy Coming From The Issuing Agency Of Valid And Current Registration Certificate (sec Certificate Of Registration For Corporation Or Dti Certificate Of Registration For Sole Proprietorship Or Cda Certificate Of Registration For Cooperative) 4. Valid And Current Mayor’s Or Business Permit 5. Valid And Current Tax Clearance 6. Valid And Current Pcab License And Registration 7. Audited Financial Statement 8. Three (3) Sets Photocopy Of Eligibility And Financial Envelope Duly Marked As “copy No.1”, “copy No.2” And “copy No.3” 21 No Further Instructions. Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property (ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Special Conditions Of Contract Gcc Clause 2 Sectional Completion Is Not Applicable The Intended Completion Date Is Three Hundred Sixty-five (365) Calendar Days From The Date Of Receipt Of The Ntp. 4.1 The Procuring Entity Shall Give Possession Of All Parts Of The Site To The Contractor From The Date Of The Receipt Of Notice To Proceed (ntp). 6 No Further Instructions. 7.2 Fifteen (15) Years. 10 No Dayworks Are Applicable To The Contract. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is One Tenth Of One Percent Of The Total Contract Price. 13 The Amount Of The Advance Payment Is Fifteen Percent (15%) Of The Contract Price Upon Submission To And Acceptance By The Bureau Of Corrections Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, A Bank Guarantee Or A Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission And Confirmed By The Bureau Of Corrections. 14 The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15.1 The Date By Which “as Built” Drawings Are Required Is Upon Actual Completion Of The Project. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Equivalent To Five Percent (5%) Of The Contract Price. Section Vi. Specifications Terms Of Reference Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Sablayan Prison And Penal Farm, Occidental Mindoro 1. Project Information 1.1 Project Description The Mission Of The Bucor Is To Protect Society By Confining Offenders In The Controlled Environments Of Prisons And Community-based Facilities That Are Safe, Humane, Cost-efficient, And Appropriately Secure, And That Provide Self-improvement Opportunities To Assist Offenders In Becoming Law-abiding Citizens. The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Shall Be Conducive To The Reformation And Rehabilitation Of Inmates That Will Bring Them Back Into The Mainstream Of Society As Useful Citizens Of The Country. The Contract Will Involve The Design And Build Scheme Leading To The Construction Of The Bureau Of Corrections Super Maximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm, Sablayan, Occidental Mindoro. The Plans And Designs Shall Be In Accordance With The Plan Of The Said Structures As Conceptualized By The Bucor Planning And Design Division Or As Conceptualized By The Winning Bidder If The Latter Is Found To Be Superior (as Defined In Section 3.1.1 Of This Tor). Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bureau Of Corrections Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Bucor Super Maximum Prison Facility (phase 2) Shall Be Constructed As Per Approved Drawings, Specifications, Bill Of Materials, Scope Of Works And The General Contract Conditions Following The Guidelines As Per Annex G Of Irr Of Ra 9184. This Project Aims To Be Completed Within A Year, Aligning With Our Decongestion Program. This Expedited Timeline Underscores Our Commitment To Addressing Urgent Needs Within The Correctional System And Providing Timely Solutions For The High Risk Committed Pdl. The Plans And Designs Shall Be In Accordance With The Plan Of The Said Structures As Conceptualized By The Planning And Design Division (pdd) Under. Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Construction Of Super Maximum-security Facility Shall Be Constructed As Per Approved Drawings, Specifications, Bill Of Materials, Scope Of Works And The General Contract Conditions Following The Guidelines As Per Annex G Of Irr Of Ra 9184. The Project Shall Have The Following Basic Components: A. Complete Detailed Architectural And Engineering Design Plans, Technical Specifications, And Design Calculations For The Construction Of The Project. Such Plans, Designs, And Technical Specifications Shall Be Subject For Review And Approval By The Bucor Pdd. The Design Development And The Contract Documents Phases Of The Design Shall Continue After The Bid Is Awarded. It Shall Likewise Be Subject For Review And Approval By The Director Of Directorate For Engineering Services (des). B. The Bid Shall Be Based On The Conceptual/schematic Design Drawings Prepared By The Bucor Pdd Or That Submitted By The Winning Bidder As Defined In Section 3.1.1 Of This Tor. C. The Contractor Shall Complete The Construction Of The Following Facility Component: I. One (1) Unit 2-storey“type B” Pdl Dormitory At Least 3190 Sq.m (gross Area) Polished Flooring And Sandwich Panel Roofing With The Capacity Of Atleast 340 Pdl, 2 Pdl Per Cell With Double Deck Bunk Bed (160 Cells), 1 Pdl Per Cell With Single Bed (20 Cells). The Dormitory To Include Complete Utilities, Power Supply, Cctv, Water Supply, Fire Protection; • Electrical System: Three-phase Power Line Supply, Connected From The Local Electric Utility (from Main Road/ Source To The Compound. The Power Line Shall Be Used For The Future Development Of The 50 Ha Facility. • Electrical System: Backup Power (three-phase Genset) Supply System With Capacity Not Less Than Total Computed Mva Load, Without Demand Factor (designed To Supply The Dormitory), And To Include Capacitor Bank, If Necessary; • Sewerage And Drainage Systems(pipelines To Cover From Project Site To Nearest Tapping Point); • Water Supply System With Sufficient Pressure To Provide The Water Requirement Of The Psdl. The System Is Oncomposed Of A Cistern Tank, Pumps, And An Overhead Water Storage Tank. Deep Well Source Water System (intake Box, Transmission Pipelines, Pressure Break Tanks, Chlorinator With Tanks And Accessories, Etc.) Whichever Is Deemed Most Suitable For The Facility And Is Authorized By The Lgu. • Fire Protection System (fire & Jockey Pump, Pump House), Fire Detection Alarm System And Fire Suppression Equipment Included In Dormitory. • Cctv Systems: To Install Cctv At Perimeter Fence To Monitor The Inside Compound And Dormitory To Monitor The Hallways And Blind Spots. Ii. 3 Meters Height Concrete Perimeter Security Fence With Concertina Above, To Cover 50 Hectares Area (plastered And Painted Finish); Iii. Primary And Secondary Fence For 1.8 Hectares Compound Including Gates, Catwalk And Post Towers (with Cr And Water Supply) (r.a. 10575 Rule 7). • 4 Meters Height Concrete Primary Perimeter Fence (with Catwalks, Concertina Wirings, Post Tower (with Cr And Water Supply) And Solar Lightings, (ra10575). • Secondary Perimeter Fence (3 Layer Concertina, Steel Mesh) With 300w Integrated Solar Light Every 3 Bays And (to Include Post Towers And Gates); Iv. Road Networks And Culverts • All Entry And Exit Point Of Any Bodies Of Water E.g. Creeks, Canals Shall Be Fenced Culvert By Metal Grills (non-corrosive); • The Project Has An Allocated Budget Sufficient To Cover At Least 1440 Sqm Of Road Construction Within The Prison Facility. While This Budget Allows For Road Development, Prioritization Shall Be Given To The Construction Of Culverts, Both Fenced And Road Culverts, To Ensure Adequate Drainage And Prevent Flooding. These Culverts Are Critical For The Road Leading From The Main Road To The Site, As Well As Along The Perimeter Of The Facility. To Accurately Assess The Project Scope And Design, Bidders Are Required To Conduct A Thorough Site Inspection To Identify And Evaluate All Necessary Culverts." 1.2 Contractual Framework The Contractual Arrangement To Be Used For The Project Is The Design-and-build (db) Scheme. Under This Scheme The Procuring Entity Awards A Single Contract For The Architectural/engineering Design And Construction To A Single Firm, Partnership, Corporation, Joint Venture Or Consortium. The Winning Contractor Shall Consult And Collaborate With The Bucor Pdd For The Preparation Of The Detailed Architectural Design Of The Project. The Detailed Architectural And Engineering Design Shall Be Subject For The Review And Approval By The Bucor Pdd. Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Obligations And Liabilities Of The Contractor And Its Architect Shall Be Joint And Solidary For Purposes Of The Detailed Architectural Design Of The Project In Accordance With Article 1723 Of The Civil Code Of The Philippines And Other Pertinent Laws. The Db Scheme Of Procurement Was Recommended, Endorsed, And Adopted Pursuant To The Annex G Of Irr Of Ra 9184. 2. Scope Of Contract 2.1 Obligations Of The Winning Bidder/contractor A. Render Architectural And Allied Engineering Design Services Including Final Schematic Design Necessary For The Implementation Of The Project. The Allied Engineering Design Services Shall Include, But Shall Not Be Limited To, Design For Architectural, Civil, Structural, Electrical, Mechanical, Plumbing, And Electromechanical. All Drawings Shall Be Generated Using Modern Modeling/drafting Software And Printed On High Quality 20” X 30” Blue Print Paper. B. Undertake Detailed Architectural And Engineering Designs (daeds) Using The Given Data Such As Topographic, Hydrographic And Cross–section Surveys, Geotechnical And Geological Investigation, And Hydrologic Investigation And Initial Schematic Design Or Design Concept Provided By The Bucor Pdd Which Conforms With The Minimum Performance Specifications And Standards (mpss); C. If Applicable, Secure Environmental Clearance Or An “environmental Compliance Certificate (ecc)”. If The Proposed Project Is Considered Outside The Purview Of The Philippine Environmental Impact Statement (eis) System, A Certificate Of Non- Coverage Or Certificate Of Exemption Shall Be Secured. D. The Project Shall Be Constructed According To The Daeds Prepared By The Winning Bidder And Approved By The Bucor And In Compliance With The Mpss As Well As Provided In Rule Vii, Section 7 Of The Irr Of Ra 10575. Likewise, Construction Includes Conformance To The Provisions Pertaining To Buildings Under The Latest Edition Of The Dpwh Standard Specifications For Public Works Structures, Volumes Ii And Iii (blue Book). The Blue Book Prescribes, Among Other Things, The Material Requirements And Construction Requirements For Different Items Of Work, Including The Tests To Be Conducted During Construction By The Dpwh-accredited Testing Laboratory. The Blue Book Incorporates Pertinent Provisions Of The American Society For Testing And Materials (astm) And American Concrete Institute (aci), Among Other Standards, Pertaining To Construction. Attention Shall Be Given To The Relevant Items Of Work In The Following Parts Of The Blue Book: Volume Ii ➢ Part A – Facilities For The Engineer ➢ Part B – Other General Requirements Volume Iii ➢ Part A – Earthwork ➢ Part B – Plain And Reinforced Concrete Works ➢ Part C – Finishing ➢ Part D – Electrical ➢ Part E – Mechanical ➢ Part I – Water Supply ➢ Part J – Flood Control And Drainage ➢ Part I-c – Drainage Works For Materials And Technologies Not Covered By The Blue Book, Or If The Proponent Intends To Use Any New Material/technology Which Is Not Accredited By The Dpwh Bureau Of Research And Standards (brs), The Proponent Shall Submit A Certification From A Recognized Foreign Or International Institution To The Effect That The New Materials Or Technology Meets The Mpss For This Project And Has Been Successfully Used In Existing Structures With Proven Integrity. The Winning Bidder Or Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Specified In Section 62.2 Of The Irr Of Ra 9184; And, F. The Winning Bidder Or Contractor Shall Be Solely Responsible For The Design And Shall Be Held Responsible For Any Default Resulted From Improper Design. Further, Extended Liability Of The Contractor Since It Stipulated That The Works, When Completed, Shall Be Fit For The Purpose For Which It Was Intended As Defined In The Contract. 2.2 Obligations Of The Bucor A. Provide Full Information On All Requirements For The Project; B. Approve The Winning Bidder Or Contractor’s Design Without Diminishing Their Full And Sole Responsibility For The Quality And Integrity Thereof; C. Give Prompt Written Notice Thereof To Winning Bidder Or Contractor, If It Observes Or Becomes Aware Of Any Defect In The Project; D. Designate, When Necessary, Representatives Authorized To Act On Its Behalf. It Shall Examine Documents Submitted By The Winning Bidder Or Contractor And Render Decisions Pertaining Thereto Promptly, To Avoid Unreasonable Delay In The Progress Of Their Work. It Shall Observe The Procedure Of Issuing Orders To The Winning Bidder Or Contractor; E. Supervise And Monitor The Implementation Of The Project; I. Construction Monitoring And Testing Forms: • The Use Of Construction Monitoring And Testing Forms That Will Be Provide By The Bucor - Nhq Pdd Is Mandatory Throughout The Duration Of Construction. • Oversight Of These Forms Will Be Conducted By The Engineering Services (es) Of The Sppf On Behalf Of The Bucor Pdd • Sppf-es To Impose To Contractor Testing Of All Items After Installation And/or Application. Es To Send Pdd Copy Of The Test Report/s. • Sppf-es To Monitor Material Delivery Of Contractor To Ensure All Materials Installed And/or Applied Are In Accordance With The Specifications Stated On Plans And Contract Of This Project. • In Case There Would Be Substitute Or Alternative To The Original Specification Of Material/s, Sppf- Es To Inform Pdd Of Such Variation. Ii. Bucor Engineer Visits: • Nhq Engineers And Architects (personnel Of Pdd) Will Conduct Site Visits On A Quarterly Basis Or Whenever Deemed Necessary To Ensure Compliance With Standards And Regulations. • Pdd Personnel To Witness The Final Testing And Commissioning Of The Systems, Equipment And Utilities Prior To Acceptance Of The Project Or Part Of The Project Thereof. Iii. Progress Billing Payment: • Sppf Es Engineers Will Provide Monthly Updates, Or As Deemed Necessary, On The Statement Of Work Accomplishment Based On The Actual Progress Of The Project, Including Reports Update. F. Pay The Accomplishment Accepted In The Conformance With The Mpss Included Under The Design And Build Contract. I. This Reports And Swa Updates Of The Ippf Es Will Be Reviewed And Approved By Pdd - Nhq Prior To Any Progress Billing Payments Being Made. 2.3 Bidding Documents The Bidding Documents For The Project Shall Govern The Conduct Of The Procurement Of The Project. 3. Scope Of Works 3.1 Planning And Design Phase 3.1.1 Preliminary Architectural Plan (pap) By Bidder The Approved Concept Design Shall Adopt The Provisions Indicated In Rule Vii, Section 7 Of The Irr Of Ra 10575. Bidders Shall Submit Also An Alternative Design Concept With Respect To The Actual Site Condition. This Alternative Design By The Winning Bidder Shall Be Adopted Should The Same Be Found To Be Superior Than The One Conceptualized By The Bucor Pdd. 3.1.2 Detailed Architectural And Engineering Design (daed) By The Winning Bidder During The Implementation Of The Project, The Winning Bidder Shall Prepare The Daed Of The Project And Submit The Same To The Bucor For Approval Prior To The Execution Of The Construction Works. The Winning Bidder Shall Prepare The Daed Based On Its Pap As Reviewed And Accepted By The Bucor Pdd And In Accordance With The Minimum Performance Standards And Specifications (mpss). The Daed Shall Be Undertaken With A Degree Of Accuracy That Will Allow Estimates To Be Made Within Approximately Plus Or Minus Five Percent (+/-5%) Of The Final Quantities. Once Approved By The Bucor, The Winning Bidder’s Daed Shall Form Part Of The Mpss. The Bucor-approved Daed, Together With The Mpss Provisions On Construction Under Section 2.0 Hereof, Shall Govern The Actual Construction Undertaken By The Winning Bidder. The Winning Bidder Shall Undertake The Necessary Field Surveys And Investigation In Accordance With The Dpwh Design Guidelines. In Carrying Out These Works, The Winning Bidder Shall Ensure That The Engineering, Environmental, Particularly During Field Investigations And The Development Of The Preliminary And Final Detailed Engineering Designs. The Winning Bidder Shall Ensure That All Designs Submitted For Approval Have Fully Taken Into Account Key Findings From The Engineering, Environmental, And That Negative Environmental Impacts Have Been Minimized Or Eliminated To The Fullest Extent Possible. 3.1.3 Architectural And Engineering Design Submittals I. Architectural Design A. The Building Should Be Designed With Structural, Electrical, Natural Or Combine Ventilation And Natural Lighting Following Building Design Standards. B. The Prospective Bidder Shall Prepare The Preliminary Architectural Plans In Accordance With The Requirements Of The National Building Code Of The Philippines, Accessibility Law (bp 344) Including All Other Applicable Laws And Local Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Site Development Plan 2. Vicinity Map 3. Perspective 4. Floor Plans 5. Elevations A. Front Elevation B. Rear Elevation C. Right Elevation D. Left Elevation 6. Sections A. Longitudinal Section B. Cross Section 7. Doors & Window Schedule 8. Plans And Details Of Stairs And Ramps 9. Schedule Of Finishes For Floors, Walls And Ceiling 10. Miscellaneous Details Ii. Structural Design A. The Proponent Shall Prepare The Necessary Structural Analysis/calculation And Design Of The Structural Members Of The Building Component In Accordance With The National Building Code Of The Philippines With Its Referral Codes Such As The Latest National Structural Code Of The Philippines. The Design For The Structure Shall Take Into Account, Among Other Things, The Seismic Requirements Of The Area To Determine The Optimum Safety Of The Whole Structure And To Minimize Possible Earthquake Damage. B. On The Basis Of The Data Obtained From The Detailed Site Investigations, Topographical/soil And Survey, Geotechnical Engineering, Foundation Investigation, Material Testing, Survey Of Existing Site Conditions, The Seismic Requirements Of The Area, The Load Requirements Of The Building And Other Investigation Required To Obtain The Data Necessary To Ensure The Safety Of The Structure, The Proposal Shall Prepare The Preliminary Structural Design Plans Of The Structure. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Structural Design Criteria And Design Notes 2. Foundation Plan 3. Floor Framing Plans 4. Schedule Of Slab, Beams And Girders 5. Schedule Of Columns 6. Schedule Of Footings 7. Structural Details Of Stairs/ramp, If Applicable 8. Roof Framing Plan, If Applicable 9. Schedule And Details Of Trusses, If Applicable 10. Road Design And Details (if Applicable) 11. Miscellaneous Details Iii. Sanitary/plumbing Design A. General • The Detailed Design Shall Conform To The General Standards Adopted By The Sanitary & Plumbing Code Of The Philippines And Other Pertinent Laws And Ordinances. • All Design Considerations/assumptions Shall Be Based On The Results Of The Technical Studies, Detailed Analyses, And Design Computations. • The Technical Drawings And Specifications Shall Clearly Indicate All The Details Required To Ascertain The Care And Thoroughness Devoted In The Preparation Of The Drawings. B. Drainage And Sewerage • The Drainage Layout Shall Show All The Required Information Such As Direction Of Flow, Manhole-to-manhole Distances, And Sizes Of Lines, Manholes/canals, Location Of Outfalls, Etc. • The Prospective Bidder Shall Prepare A Design For The Sewage Treatment Plant In Accordance To The Clean Water Act Of 2004 (republic Act No. 9275) And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Sewer, Vent And Storm Drainage Layout 4. Enlarged Toilet Plan For Common And Pwd Toilets 5. Isometric Diagram 6. Miscellaneous Details 7. Drainage And Sewerage System 8. Three Chamber Septic Tank Plans And Details C. Water Supply And Distribution System • The Proponent Shall Carry Out A Preliminary Detailed Design For The Water Supply Of The Project. The Design Should Be On The Basis Of The Source And Volume Of Water Supply, Water Consumption, Piping Network, And Conveyance In Accordance With The Applicable Laws, Rules And Regulations Governing Health, Safety And Sanitation. • The Contractor Shall Install Elevated Water Storage/s Per Unit Located At The Roof Deck Of The Prison Dormitories. (sufficient Capacity To Supply The Pdl) Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Water Line Layout 4. Water Line Isometric Diagram 5. Water Reservoir Plans And Details 6. Miscellaneous Details Iv. Electromechanical Design A. Sewage Treatment Plant • The Prospective Bidder Shall Prepare A Design For The Sewage Treatment Plant In Accordance To The Clean Water Act Of 2004 (republic Act No. 9275) And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Electrical System Layout 4. Mechanical System Layout 5. Instrumentation And Control System Diagrams 6. Piping And Instrumentation Diagrams (p&ids) 7. Equipment Details And Specifications 8. Electrical Power Distribution 9. Emergency Power Systems 10. Grounding And Lightning Protection 11. Control And Monitoring Systems, If Applicable 12. Safety Systems 13. Miscellaneous Details B. Fire Protection System • The Prospective Bidder Shall Prepare A Design For The Fire Protection System In Accordance To The Fire Code Of The Philippines, (irr) Of Ra 9514, And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Sprinkler System 2. Sprinkler System Isometric Diagram 3. Fire Fighting Piping System Diagram 4. Fire Alarm System Layout 5. Fire Suppression System Layout 6. Smoke Management System Layout 7. Fire Pump And Water Supply 8. Miscellaneous Details V. Electrical Design A. The Prospective Bidder Shall Prepare A Preliminary Design Plan For The Electrical And Power Supply System Of The Building In Accordance With The Electrical Code Of The Philippines, Fire Code Of The Philippines, National Building Code Of The Philippines And Other Relevant Laws And Ordinances. B. The Prospective Bidder Shall Prepare A Design For The Electrical And Power Supply System Considering Ease Of Maintenance And Prevention Of Illegal Connections Including Electrical Supply For Ceiling Fans. C. The Prospective Bidder Shall Prepare A Design For Backup Power Generator With Capacity Not Less Than Total Computed Kva Load Without Demand Factor. D. 3-phase Electrical Supply Shall Be Sourced From The Local Electrical Utility. E. Power Line Connection From Main Source To The Facility Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Power Riser Diagram 2. Power Layout System 3. Lighting Layout System 4. Local Area Network System, If Applicable 5. Grounding System 6. Load Schedules 7. Others As Applicable Vi. Other Requirements Technical Specifications Boring Test Structural Design And Analysis And Computation Final Design And Construction Plans Upon Award Of Contract, The Contractor Shall Comply The Following: O Prepare Final Draft Of Architectural And Engineering Design Plans Incorporating All Design Refinements And Revisions Based On Project Requirement Or As May Be Required By The Bucor Pdd Within The Scope Of Design. O Submit To The Bucor Design And Build Committee (bucor-dbc) The Final Architectural And Engineering Design Plans And Specifications Duly Signed And Sealed By The Concerned Professional Architect, Engineers, Incorporating All The Necessary Revisions And Refinements For Approval By The Head Of Procuring Entity. 3.2 Construction Phase The Following Works Shall Comprise This Phase: I. Permits And Clearances, The Contractor Shall Upon Authorization Of The Head Of The Procuring Entity (hope), Make Representations With The Government Agencies Concerned To Expedite The Processing Of The Necessary Permits And Certificates Such As The Following: A. Zoning Certification And Locational Clearance B. Building /electrical/sanitary Permits C. Certificate Of Occupancy D. Environmental Clearance Certificate E. All Other Permits/clearances As May Be Required For The Construction. Ii. Mobilization, The Contractor Shall Mobilize All The Required Project Team Personnel, Equipment, Tools, And Manpower With The Required Skills And In Sufficient Number As May Be Necessary For His Efficient Undertaking Of The Project. Iii. Clearing, Grubbing And Hauling/disposal Of Debris Iv. Construction Stage As A Rule, Contract Implementation Guidelines For Procurement Of Infrastructure Projects Shall Comply With Annex “e” Of The Revised Irr Of Ra 9184. The Following Provisions Shall Supplement These Procedures: I. No Works Shall Commence Unless The Contractor Has Submitted The Prescribed Documentary Requirements And Implementing Unit Has Given Written Approval. Work Execution Shall Be In Accordance With Reviewed And Approved Documents. Ii. The Contractor Shall Be Responsible For Obtaining All Necessary Information As To Risks, Contingencies And Other Circumstances Which May Affect The Works And Shall Prepare And Submit All Necessary Documents Specified By The Implementing Unit To Meet All Regulatory Approvals As Specified In The Contract Documents. Iii. The Contractor Shall Submit A Detailed Program Of Works Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) For Approval By The Head Of The Procuring Entity (hope) That Shall Include, Among Others: A. The Order In Which It Tends To Carry Out The Work Including Anticipated Timing For Each Stage Or Design/detailed Engineering And Construction; B. Periods For Review Of Specific Outputs And Any Other Submissions And Approvals; C. Sequence Of Timing For Inspection And Tests; D. General Description Of The Design And Construction Methods To Be Adopted; E. Number Of Personnel To Be Assigned For Each Stage Of The Work; F. List Of Equipment Required On Site For Each Stage Of The Work; And G. Description Of The Quality Control System To Be Utilized For The Project. Iv. Any Errors, Omissions, Inconsistencies, Inadequate Or Failure Submitted By The Contractor That Do Not Comply With The Requirements Shall Be Rectified, Resubmitted And Reviewed At The Contractor’s Cost. If The Contractor Wishes To Modify Any Design Or Document Which Has Been Previously Submitted, Reviewed And Approved, The Contractor Shall Notify The Implementing Unit Within A Reasonable Period Of Time And Shall Shoulder The Cost Of Such Changes. V. As A Rule, Changes In Design And Construction Requirements Shall Be Limited Only To Those That Have Not Been Anticipated In The Contract Signing And Approval. The Following Guidelines Shall Govern Approval For Change Or Variation Order: A. Change Orders Resulting From Design Errors, Omissions Or Non-conformance With The Performance Specifications And Parameters And The Contract Documents By The Contractor Shall Be Implemented By The Contractor At No Additional Cost To The Bureau Of Corrections. B. Provided That The Contractor Suffers Delay And/or Incurs Costs Due To Changes Or Errors In The Preparation Of Performance Specification And Parameters, The Contractor Shall Be Entitled To Either One Of The Following: An Extension Of Time For Any Such Delays Under Section 10 Of Annex “e” Of Irr-a (ra9184; Or Payments For Such Cost As Specified In The Contract Documents, Provided That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. C. The Contract Documents Shall Include The Manner And Schedule Of Payment Specifying The Estimated Contract Amount And Installments In Which The Contract Will Be Paid. D. The Contractor Shall Be Entitled To Advance Payment Subject To The Provisions Of Section 4 Of Annex “e” Of The Revised Irr Of Ra 9184. E. The Implementing Unit Shall Monitor The Quality Control Procedures For The Design And Construction In Accordance With The Government Guidelines And Shall Issue The Proper Certificates Of Acceptance For Sections Of The Works Or Whole Of The Works As Provided For In The Contract Documents. F. The Contractor Shall Provide All Necessary Equipment, Personnel, Instruments, Documents And Others To Carry Out Specified Tests. G. This Design And Build Project Shall Have Minimum Defects Liability Period Of One (1) Year Contract Completion Or As Provided In The Contract Documents. This Is Without Prejudice To The Liabilities Imposed Upon The Engineer/architect Who Drew Up The Plans And Specification For A Building Sanctioned Under Section 1723 Of The New Civil Code Of The Philippines. H. The Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Of 15 Years For Permanent Structures/buildings And 5 Years For Roads As Specified In Section 62.2.2 Of The Revised Irr Of Ra 9184 V. As-built Plans. The Contractor Shall Cause The Preparation And Submission Of As-built Plans Duly Signed And Sealed By All Concerned Parties Involved In The Construction In The Same Sheet Size And Scale As The Original Drawings In One (1) Blue Print Copy And One (1) Reproducible Copy. Vi. General Requirements: 1. Temporary Facilities Such As Field Offices For The Bucor Inspectorate Team, Project Engineers And Quarters For Laborers; Temporary Warehouse For The Construction Material. 2. Office Furniture And Equipment, Survey Equipment And Consumables 3. Photographs: This Item Consists Of The Supply Of Equipment And Materials, I.e., Album, Necessary To Undertake Photographic Progress Activities Of The Project And Of All Cost Incidental To The Preparation And Submission Of Photographs (at Least 12 Photographs Per Day). The Quantities For Photographs Shall Be One (1) Set Of Photographs Per Month. 4. Health And Safety Program Including Personal Protective Equipment (ppe) A. All Standard Safety Measures And Precautions Shall Be Exercised By The Contractor In The Course Of The Project For The Protection Of The Public And Its Workers And In Conformity With Dole Department Order No. 13, Series Of 1998. B. All Workers Shall Be Equipped With Proper Working Uniform And Identification At All Times. They Must Be Registered With The Governing Bucor Security Office And Must Comply With The Bucor’s Rules And Regulations. C. The Contractor Shall Secure His/her Own Equipment And Materials On Site. The Bucor Shall Not Be Liable To Any Losses Incurred During The Progress Of The Work. 5. Minimum Heavy Equipment Requirement (as Needed) For Site Development Such As: No. Item Specification 1. Backhoe 0.8 Cu. M. 2. Backhoe Wheel Mounted With Breaker 0.90 Cu. M. 3. Cargo/service Truck 2-5 Mt., 160 Hp 4. Dump Truck 12 Cu. Yd. 5. Motorized Road Grader G710a, 140hp 6. Payloader 1.5 Cu. M. 7. Vibrator Roller 10 Mt 8. Bulldozer 170 Hp 9. Scraper 515 Hp 10. Truck Mounted Crane, Hydraulic Telescopic Bommer Capacity: 41 – 45 Mt. 11. Crawler Crane 41-45 Mt 12. Generator Set 300 Kw/375 Kva 13. Water Pump 100mm Suction Dia. 14. One Bagger Mixer 4-6 Ft3/min 15. Concrete Vibrator Ey20, 5hp, 32-70mm 16. Vibro Hammer 45000 Kg-m 17. Excavator 17.5 Kw Or Any Specify Types Of Heavy Equipment Needed For A Site Development Will Be Determined By The Winning Bidder. 6. Environmental Compliance 7. Communication Equipment: This Item Consists Of The Provision Of Communication Equipment. 8. Billboard 9. Traffic Management (if Applicable). Vii. Building Construction 1 Lot One (1) Unit 2-storey“type B” Pdl Dormitory At Least 3190 Sq.m (gross Area) Polished Flooring And Sandwich Panel Roofing With The Capacity Of Atleast 340 Pdl, 2 Pdl Per Cell With Double Deck Bunk Bed (160 Cells), 1 Pdl Per Cell With Single Bed (20 Cells). The Dormitory To Include Complete Utilities, Power Supply, Cctv, Water Supply, Fire Protection; • Electrical System: Three-phase Power Line Supply, Connected From The Local Electric Utility (from Main Road/ Source To The Compound. The Power Line Shall Be Used For The Future Development Of The 50 Ha Facility. • Electrical System: Backup Power (three-phase Genset) Supply System With Capacity Not Less Than Total Computed Mva Load, Without Demand Factor (designed To Supply The Dormitory), And To Include Capacitor Bank, If Necessary; • Sewerage And Drainage Systems(pipelines To Cover From Project Site To Nearest Tapping Point); • Water Supply System With Sufficient Pressure To Provide The Water Requirement Of The Psdl. The System Is Composed Of A Cistern Tank, Pumps, And An Overhead Water Storage Tank. Deep Well Source Water System (intake Box, Transmission Pipelines, Pressure Break Tanks, Chlorinator With Tanks And Accessories, Etc.) Whichever Is Deemed Most Suitable For The Facility And Is Authorized By The Lgu. • Fire Protection System (fire & Jockey Pump, Pump House), Fire Detection Alarm System And Fire Suppression Equipment Included In Dormitory. • Cctv Systems: To Install Cctv At Perimeter Fence To Monitor The Inside Compound And Dormitory To Monitor The Hallways And Blind Spots. 1 Lot 3 Meters Height Concrete Perimeter Security Fence With Concertina Above, To Cover 50 Hectares Area (plastered And Painted Finish); 1 Lot Primary And Secondary Fence For 1.8 Hectares Compound Including Gates, Catwalk And Post Towers (with Cr And Water Supply) (r.a. 10575 Rule 7). • 4 Meters Height Concrete Primary Perimeter Fence (with Catwalks, Concertina Wirings, Post Tower (with Cr And Water Supply) And Solar Lightings, (ra10575). • Secondary Perimeter Fence (3 Layer Concertina, Steel Mesh) With 300w Integrated Solar Light Every 3 Bays And (to Include Post Towers And Gates); 1 Lot Road Networks And Culverts • The Project Has An Allocated Budget Sufficient To Cover At Least 1440 Sqm Of Road Construction Within The Prison Facility. While This Budget Allows For Road Development, Prioritization Shall Be Given To The Construction Of Culverts, Both Fenced And Road Culverts, To Ensure Adequate Drainage And Prevent Flooding. These Culverts Are Critical For The Road Leading From The Main Road To The Site, As Well As Along The Perimeter Of The Facility. • All Entry And Exit Point Of Any Bodies Of Water E.g. Creeks, Canals Shall Be Fenced Culvert By Metal Grills (non-corrosive); • To Accurately Assess The Project Scope And Design, Bidders Are Required To Conduct A Thorough Site Inspection To Identify And Evaluate All Necessary Culverts. A. Material Specifications: A. Floor Finishes • Polished Cement Finish Prison Cell, Hallways, Staircases, And Rooms • Plain Cement Finished - Pathways. • Ramps - Anti Slip Pavers Or Tiles • Crs – Unglazed Ceramic Tiles B. Wall Finishes A. Glazed Wall Tiles - 1.8m Height. B. Plain Cement Plaster Finish - For All Buildings And Facilities C. Ceiling Finishes C. Concrete Steel Decking, If Applicable. – Coated In White Enamel D. Painting D. Semi-gloss Solvent Paint Top Coat (high-end Quality) For Interior And Exterior Walls In Two To Three Coats Application. Apply Concrete Neutralizer For Newly Finished Concrete Surfaces. Use Solvent Primer. E. Varnish Paint Finish With Weather Proof Coating – For Doors And Jambs Branded, High-end Quality (offices, Etc.), All Wooden Doors Must Have Secondary Steel Doors. F. Use Epoxy Paint Primer. Epoxy Paint Finish – For Structural Steel And All Metal Works E. Doors And Windows G. No Doors For Prison Facility Comfort Rooms With 1.20 Meter Finish Wall Height (see Rule Vii, Section 7 R-irr Of Ra 10575). H. Steel Doors And Grills – For Dormitories, Gates And Other Security Areas. Sliding Doors For All Cells (see Rule Vii, Section 7 R-irr Of Ra 10575) F. Waterproofing I. Uv Resistant Polyurethane Waterproofing – For All Roof Deck With Topping Works Provided With Welded Wire Mesh. (at Elevated Water Tank Area) J. Cistern - Polyurethane Waterproofing G. Plumbing Works K. Upvc Pipe Series 1000 – For All Soil, Sewer, Waste, Dry And Wet Vent Piping High-end Quality L. Pprc Fusion Type – For All Water Lines High-end Quality M. Contractor Encouraged To Adapt: Lpf Flush Valve For Water Closet Or Stainless Toilet-lavatory Combination. Waterless Urinals N. Sprinkler System To All Prison Dormitories In Accordance With The Provisions Of Revised Plumbing Code Of The Philippines. O. Contractor To Provide A Water System To Supply The Facility 4. Approved Budget For The Contract (abc) The Approved Budget For The Contract (abc) Is Php 300,000,000. This Is The Ceiling For Acceptable Bids. Bids Higher Than Abc Shall Be Automatically Rejected. 5. Proposed Implementation Schedule (example): No. Of Months 1 2 4 5 6 7 8 9 10 11 12 Design Phase Construction Phase 6. Eligibility Criteria For Bidders 6.1 General The Eligibility Requirements For This Design And Build Project Shall Adopt The Provisions Of Annex “g” Of The Implementing Rules And Regulations Of Ra 9184 (e.g. Eligibility Requirement). However, If A Bidder Who Has No Experience In Db Project On Its Own May Opt To Enter A Subcontracting Agreement, Partnership, Or Joint Venture With A Design Or Engineering Firm For The Design Portion Of The Project. 6.2 Legal Requirements A. Valid Contractor’s License Issued By The Philippine Contractor’s Accreditation Board B. Valid License Of The Contractor’s Designer Issued By The Professional Regulation Commission. 6.3 Technical Requirements A. The Contractor’s Designer Must Have Designed One Structure Similar To The Project At Hand With A Construction Cost Of At Least 50 % Of The Abc. 6.4 Financial Requirements The Contractor Must Have A Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc To Be Bid Or Equivalent To Php300,000,000.00. 7. Contents Of The Bid 7.1 In The First Envelope Class “a” Documents Legal Documents I. Philgeps Certificate Of Registration And Membership In Accordance With Section 8.5.2 Of This Irr. For Procurement To Be Performed Overseas, It Shall Be Subject To The Guidelines To Be Issued By The Gppb. (a) Ii. Pcab License And Registration, In Case Of Jv; 57 Iii. Statement Of All Ongoing Government And Private Contracts; Iv. Statement Of Slcc; V. Nfcc Computation; Vi. Jva, If Applicable; Vii. Bid Security In The Prescribed Form, Amount And Validity Period; Viii. Project Requirements, Which Shall Include The Following: 1. Organizational Chart For The Contract To Be Bid; 2. List Of Contractor’s Personnel (design And Construction), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; 3. List Of Contractor’s Equipment Units Which Are Owned, Leased And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From Lessor/vendor For The Duration Of The Project. Ix. Omnibus Sworn Statement By The Prospective Bidder Or Its Authorized Representative In The Prescribed Format; X. Submission Of Preliminary Conceptual Design Plans: Class “b” Documents I. For Infrastructure Projects, Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And It’s Irr. Ii. Each Partner Of The Joint Venture Shall Submit Their Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. 1. Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) A. Location Plan/vicinity Map B. Perspective C. Floor Plans D. Front View Elevation E. Rear View Elevation F. Left Side View Elevation G. Right Side View Elevation H. Longitudinal Section I. Transverse Section 2. Design And Construction Method 3. List Of Contractor’s Personnel To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc), Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; For Design The Key Professionals And The Respective Qualifications Of The Design Personnel Shall Be As Follows: • Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. • Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. • Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Ten (5) Years’ Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel The Key Professionals And The Respective Qualifications Of The Construction Personnel Shall Be As Follows: • Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. • Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. • Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. • Foreman The Foreman Must Have At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Safety Officer The Safety Officer Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) And Must Have At Least Two (2) Years’ Experience. 4. Value Engineering Analysis Of Design And Construction. The Second Envelope (financial Proposal) Shall Contain All The Required Documents For Infrastructure Projects Under Section 25.38 Of The Irr Of R.a 9184. 7.2 In The Second Envelope – Financial Proposal The Contents Of Financial Proposal – In The Second Envelope Shall Be Governed By Section 6.1 Design And Build Scheme Of The Dpwh Procurement Manual Volume Ii - Infrastructure Main Guidelines (2016). A. Lump Sum Bid Prices, Which Shall Include The Detailed Engineering Cost, In The Prescribed Bid Form Inclusive Of Vat B. Detailed Estimates Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals Used In Coming Up With The Bid For The Following: I Detailed Architectural And Engineering Design; Ii Demolition Works; And Iii Building Construction/civil Works. C. Bill Of Quantities D. Cash Flow And Payments Schedule. 8. Procedure And Criteria For Bids Evaluation For The Detailed Evaluation Of The Design And Build Proposals A Two-step Procedure Shall Be Adopted By The Bac, Which May Be Undertaken With The Assistance Of The Dbc. First-step Procedure: With The Assistance Of The Bucor Design And Build Committee (bucor-dbc), The Bac Shall Conduct The Opening, Preliminary Examination And Detailed Evaluation Of The Design And Build Proposals, As Follows: (1) The First Step Of The Evaluation Shall Involve The Review Of The Preliminary Conceptual Designs And Track Record Submitted By The Contract As Indicated In The Bidding Documents Using A Nondiscretionary “pass/fail” Criteria That Involve Compliance With The Following Requirements: A. Performance Specifications And Parameters And Degree Of Details; B. Adherence Of Preliminary Design Plans To The Required Concept Of Approach And Methodology For Detailed Engineering, Design And Construction With Emphasis On The Clarity, Feasibility, Innovativeness And Comprehensiveness Of The Plan Approach, And The Quality Of Interpretation Of Project Problems, Risks, And Suggested Solutions; And C. Quality Of Personnel To Be Assigned To The Project Which Covers Suitability Of Key Staff To Perform The Duties Of The Particular Assignments And General Qualifications And Competence Including Education And Training Of The Key Staff. 8.1 Merit Point Critera For The Bid Evaluation 8.1.1 Adherence To Performance Specifications (35 Points) A. Compliance And Adherence To Specifications: Excellent Compliance (100 Points): The Submission Fully Adheres To All Specified Project Requirements And Regulations, Demonstrating Meticulous Attention To Detail And Comprehensive Understanding Of The Tor. All Drawings And Documentation Are Accurate, Complete, And In Compliance With Relevant Standards. Good Compliance (80 Points): The Submission Largely Complies With Project Specifications And Regulations, With Minor Discrepancies. Drawings And Documentation Are Mostly Accurate And Complete, Meeting The Majority Of Requirements. Acceptable Compliance (70 Points): The Submission Satisfies Most Of The Specified Requirements And Regulations, Albeit With Some Notable Omissions Or Inconsistencies. Drawings And Documentation Are Generally Accurate And Complete, Meeting The Basic Expectations. Some Reservations (50 Points): The Submission Partially Meets The Specified Requirements And Regulations, With Several Notable Deficiencies Or Inconsistencies. There Are Significant Gaps Or Inaccuracies In The Drawings And Documentation, Raising Concerns About Compliance. Serious Reservations (20%) The Submission Falls Significantly Short Of Meeting The Specified Requirements And Regulations, With Major Deficiencies Or Inconsistencies. Drawings And Documentation Lack Essential Details Or Fail To Comply With Key Standards, Casting Doubt On The Bidder's Understanding Of The Project Scope. Unacceptable (0%) The Submission Fails To Comply With The Specified Requirements And Regulations, Lacking Essential Details And Demonstrating A Fundamental Misunderstanding Of The Project Scope. Drawings And Documentation Are Incomplete Or Inaccurate, Indicating A Lack Of Capability To Deliver The Project On Time. B. Functionality And Efficiency: Excellent (100%): The Design Optimally Utilizes Space, Facilitating Efficient Accommodation Of 500 Psdl. Layout And Design Enhance Operational Flow, Demonstrating Exceptional Foresight And Planning. Integration Of Facilities Promotes Smooth Prison Management. Good (80%): The Design Effectively Utilizes Space, With Minor Areas For Improvement In Operational Flow. Layout And Design Contribute To Efficient Prison Management, Meeting Most Functional Requirements. Acceptable (70%): The Design Adequately Utilizes Space, Meeting Basic Requirements For Accommodating 500 Psdl. Layout And Design Support Operational Flow, Though Some Improvements Are Needed For Optimal Functionality. Some Reservations (50%): The Design Partially Optimizes Space Utilization, With Notable Deficiencies In Operational Flow. Layout And Design Hinder Efficient Prison Management, Requiring Significant Adjustments For Improvement. Serious Reservations (20%): The Design Inadequately Utilizes Space, Hindering Accommodation Of 500 Psdl. Layout And Design Severely Impede Operational Flow, Indicating A Lack Of Understanding Of Functional Requirements. Unacceptable (0%): The Design Fails To Optimize Space Utilization, Lacking Consideration For Accommodating 500 Psdl. Layout And Design Pose Significant Obstacles To Efficient Prison Management, Indicating A Fundamental Misunderstanding Of Functional Requirements. C. Safety And Security: Excellent (100%): The Design Features Robust Perimeter Walls, Guard Towers, And Security Features Ensuring Optimal Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Highly Reliable, With Comprehensive Safety Measures For Both Psdl And Staff. Good (80%): The Design Incorporates Effective Perimeter Walls, Guard Towers, And Security Features, With Minor Areas For Enhancement. Fire Protection And Detection Systems Are Reliable, With Adequate Safety Measures For Psdl And Staff. Acceptable (70%) The Design Includes Satisfactory Perimeter Walls, Guard Towers, And Security Features, Meeting Basic Requirements For Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Functional, With Sufficient Safety Measures For Psdl And Staff. Some Reservations (50%): The Design Features Partially Effective Perimeter Walls, Guard Towers, And Security Features, With Notable Deficiencies In Pdl Containment And Facility Security. Fire Protection And Detection Systems Lack Reliability, With Limited Safety Measures For Psdl And Staff. Serious Reservations (20%): The Design Lacks Effective Perimeter Walls, Guard Towers, And Security Features, Compromising Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Inadequate, Posing Significant Risks To Psdl And Staff Safety. Unacceptable (0%): The Design Neglects Perimeter Walls, Guard Towers, And Security Features, Failing To Ensure Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Absent Or Non-functional, Posing Severe Risks To Psdl And Staff Safety. D. Sustainability And Environmental Considerations: Excellent (100%): The Design Includes Robust Safety Measures And Emergency Protocols, Ensuring The Safety And Well-being Of Psdl And Staff In Accordance With Ra 10575. Good (80%): The Design Integrates Sustainable Design Principles Effectively, With Minor Opportunities For Improvement In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Adequate, Supporting Environmental Sustainability. Acceptable (70%) The Design Includes Basic Sustainable Design Principles, Meeting Minimum Requirements For Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Functional, Contributing To Environmental Sustainability. Some Reservations (50%): The Design Partially Incorporates Sustainable Design Principles, With Notable Deficiencies In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Lack Comprehensiveness, Limiting Environmental Sustainability. Serious Reservations (20%): The Design Lacks Consideration For Sustainable Design Principles, Neglecting Energy Efficiency And Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Insufficient, Undermining Environmental Sustainability. Unacceptable (0%): The Design Disregards Sustainable Design Principles, Showing No Commitment To Energy Efficiency Or Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Absent Or Inadequate, Disregarding Environmental Sustainability. E. Aesthetics And Architectural Design: Excellent (100%): The Design Exhibits Exceptional Aesthetic Appeal And Architectural Coherence, Showcasing Innovative And Visually Pleasing Elements. Consideration Of Local Architectural Vernacular And Contextual Integration Is Evident, Contributing To The Overall Excellence Of The Design. Good (80%): The Design Demonstrates Good Aesthetic Appeal And Architectural Coherence, With Some Areas For Enhancement In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Apparent, Enriching The Design. Acceptable (70%): The Design Achieves Acceptable Aesthetic Appeal And Architectural Coherence, Meeting Basic Expectations For Visual Presentation. Consideration Of Local Architectural Vernacular And Contextual Integration Is Present, Though Limited In Scope. Some Reservations (50%): The Design Lacks Significant Aesthetic Appeal And Architectural Coherence, With Notable Deficiencies In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Minimal, Detracting From The Overall Quality Of The Design. Serious Reservations (20%): The Design Exhibits Poor Aesthetic Appeal And Architectural Coherence, Failing To Engage Visually Or Inspire Interest. Consideration Of Local Architectural Vernacular And Contextual Integration Is Lacking, Diminishing The Design's Relevance And Appropriateness. Unacceptable (0%): The Design Lacks Any Aesthetic Appeal Or Architectural Coherence, Showing No Effort To Engage Visually Or Integrate With The Local Architectural Vernacular. Consideration Of Contextual Integration Is Absent, Rendering The Design Unsuitable For The Project. 8.1.2 Approach And Methodology For Detailed Engineering, Design, And Construction (40 Points) Excellent (100%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Exceptionally Clear, Feasible, Innovative, And Comprehensive. The Plan Demonstrates A High Level Of Understanding Of Project Problems, Risks, And Suggested Solutions, With Well-defined Strategies For Addressing Them. Good (80%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Clear, Feasible, And Comprehensive, With Some Innovative Elements. The Plan Adequately Addresses Project Problems, Risks, And Suggested Solutions, Though Some Areas May Require Further Development. Acceptable (70%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Satisfactorily Addresses Project Requirements, With A Basic Level Of Clarity And Feasibility. The Plan Outlines Strategies For Addressing Project Problems, Risks, And Suggested Solutions, Meeting The Minimum Expectations. Some Reservations (50%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Partially Addresses Project Requirements, With Notable Gaps In Clarity And Feasibility. The Plan Lacks Innovative Elements And May Inadequately Address Project Problems, Risks, And Suggested Solutions. Serious Reservations (20%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Demonstrates Significant Deficiencies In Clarity, Feasibility, And Comprehensiveness. The Plan Fails To Adequately Address Project Problems, Risks, And Suggested Solutions, Indicating A Lack Of Understanding Or Inadequate Planning. Unacceptable (0%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Unclear, Infeasible, And Lacks Comprehensiveness. The Plan Fails To Address Project Problems, Risks, And Suggested Solutions, Indicating A Fundamental Misunderstanding Or Disregard For Project Requirements. 8.1.3 Quality Of Personnel Assigned To The Project (25 Points) Excellent (100%): The Personnel Assigned To The Project, Including Key Staff, Are Highly Suitable And Competent To Perform Their Duties. Key Staff Members Possess Exceptional Qualifications, Competence, Education, And Training Relevant To Their Roles, Demonstrating A High Level Of Expertise And Experience. Good (80%): The Personnel Assigned To The Project, Including Key Staff, Are Suitable And Competent To Perform Their Duties Effectively. Key Staff Members Possess Relevant Qualifications, Competence, Education, And Training, Demonstrating Solid Expertise And Experience. Acceptable (70%): The Personnel Assigned To The Project, Including Key Staff, Meet The Basic Requirements For Suitability And Competence In Performing Their Duties. Key Staff Members Possess General Qualifications And Competence, Education, And Training Relevant To Their Roles, Meeting The Minimum Expectations. Some Reservations (50%): The Personnel Assigned To The Project, Including Key Staff, Demonstrate Some Suitability And Competence In Performing Their Duties, But Notable Deficiencies Are Present. Key Staff Members May Lack Certain Qualifications, Competence, Education, Or Training, Raising Concerns About Their Ability To Effectively Fulfill Their Roles. Serious Reservations (20%): The Personnel Assigned To The Project, Including Key Staff, Exhibit Significant Deficiencies In Suitability And Competence To Perform Their Duties. Key Staff Members Lack Essential Qualifications, Competence, Education, Or Training, Indicating A Lack Of Expertise Or Experience Relevant To Their Roles. Unacceptable (0%): The Personnel Assigned To The Project, Including Key Staff, Are Unsuitable And Incompetent To Perform Their Duties Effectively. Key Staff Members Lack The Necessary Qualifications, Competence, Education, And Training, Demonstrating A Fundamental Mismatch With The Requirements Of Their Roles. 8.2 Determination Of The Merit Point Score The Aggregate Of The Scores In Each Criterion Must Be 70% Or More To Pass Using The Following Formula In Equation. Description Weight (w) Rating (r) Criteria 1 35% (smax/sact) Criteria 2 40% Sact Criteria 3 25% Sact Smax = Η (100) Sact = R1 +r2 +r3 + . . .(rη) Where Η = Number Of Sub Criteria R = Rating Given To The Criteria/sub Criteria The Actual Score (sact) For Each Of The Criteria/sub Criteria Is Obtained By Adding All The Given Rating. (smax) Is The Summation Of Maximum Score Per Criteria 8.3 Passing Rate The Specific Passing Rate Value Depends On The Specific Context Of The Project, The Priorities Of The Design And Build Committee, And The Complexity Of The Requirements Outlined In Ra 10575. Based On The Provided Criteria And Descriptions, The Passing Rate For The Merit Point Criteria (mpc) Could Be Set At 75%. This Means That Bidders Must Score At Least 75% Or Higher In The Evaluation Process To Be Considered As Meeting The Minimum Requirements For The Project A. Pass Rate Per Criteria Will Be Determined Using The Formula: Score = W1*r1 + W2*r2 + W3*r3 B. A Bid Or Technical Bid That Failed In Any Of The Criteria’s Will Not Be Considered For Further Evaluation C. Score Above 75% Will Be Considered As Technically Responsive. Aggregate Score Of Less Than 75% Will Be Considered Failed, And May Be Rejected On That Basis. Second-step Procedure: Only Those Bids That Passed The Above Criteria Shall Be Subjected To The Second Step Of Evaluation. The Bac Shall Open The Financial Proposal Of Each “passed” Bidder And Shall Evaluate It Using Non-discretionary Criteria – Including Arithmetical Corrections For Computational Errors – As Stated In The Bidding Documents, And Thus Determine The Correct Total Calculated Prices. The Bac Shall Automatically Disqualify Any Total Calculated Bid Price Which Exceeds The Abc 9. Data To Be Provided By The Bucor These Data Are For Reference Only And Does Not Guarantee The Contractor That The Data Provided Are Correct, Free From Error, And Applicable To The Project At Hand. The Contractor Is Responsible For The Accuracy Or Applicability Of Any Data That He Will Use In His Design– Build Proposal And Services. Sample Data For Buildings: A. Conceptual Plans 10. Documents To Be Provided By The Contractor During Contract Implementation A. Detailed Architectural And Engineering Plans B. Design Analysis C. Survey Data D. Quantity Calculation E. Detailed Geotechnical Investigation Report F. Design Report. G. As-built Plans, (printed Including Cad Files And Bim Files (lod 500) H. Other Relevant Documents 11. Design And Build Period The Winning Bidder Shall Commence Actual Works Upon The Issuance By The Bucor Of The Notice To Proceed (ntp). The Winning Bidder Shall Complete The Daed And Submit Within The Ninety (60) Calendar Days (cds) Period To The Bucor For Review And Approval. The Contractor Shall Complete The Construction Of The Building Within 305 Cds For The Total Contract Duration Of 365 Cd. Conforme: Name Of Company In Print Signature Over Printed Name Of Authorized Representative/date Section Vii. Drawings The Conceptual Drawings Should Be Attached To This Section Or Annexed In A Separate Folder As Part Of The First Envelope (technical Component Envelope). Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: At Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 1. Location Plan/vicinity Map 2. Perspective 3. Floor Plans 4. Front View Elevation 5. Rear View Elevation 6. Left Side View Elevation 7. Right Side View Elevation 8. Longitudinal Section 9. Transverse Section Section Viii. Bill Of Quantities The Bill Of Quantities Should Be Attached To This Section As Part Of The Second Envelope (financial Component Envelope). Section Ix. Checklist Of Technical And Financial Documents Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (d) Special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc) And Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate Or Board Resolution/partnership Resolution In Case Of A Corporation, Partnership, Or Cooperative; Or Original Notarized Special Power Of Attorney In Case Of Sole Proprietorship Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. And ⬜ (h) Conformity With The Technical Specifications (scope Of Work); And ⬜ (i) Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 1. Location Plan/vicinity Map 2. Perspective 3. Floor Plans 4. Front View Elevation 5. Rear View Elevation 6. Left Side View Elevation 7. Right Side View Elevation 8. Longitudinal Section 9. Transverse Section ⬜ (j) Design And Construction Method And ⬜ (k) Value Engineering Analysis Of The Design And Construction Method. And Financial Documents ⬜ (l) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. And Class “b” Documents ⬜ (m) Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And Its Irr. Each Partner Of The Joint Venture Shall Submit Their Respective Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. Ii. Financial Component Envelope ⬜ (n) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (o) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (p) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (q) Cash Flow And Payment Schedule. Bidding Form Company Letterhead Statement Of Ongoing Government & Private Contracts Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Statement Of All Its Ongoing Government And Or Private Contracts Including Contracts Awarded But Not Yet Started, If Any Whether Similar Or Not Similar In Nature. Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Date Of Completion Or Estimated Completion Time Value Of Outstanding Works Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Statement Of Single Largest Completed Contract Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Statement Of Single (1) Largest Completed Contract Of Similar In Nature Within The Last Six (6) Years From The Date Of Submission And Receipt Of Bids Amounting To At Least Fifty Percent (50%) Of The Approved Budget Of The Contract (abc) Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Amount Of Completed Contracts, Adjusted By The Bidder To Current Prices Using Psa’s Consumer Price Index, If Necessary Date Of Completion Or Estimated Completion Time Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: Bureau Of Corrections I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. ______________________________________________________ [insert Name Of Bidder’s Authorized Representative] _____________________________ [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ Issued On ______________ At ___________________________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued Doc. No. _____ Page No. _____ Book No. _____ Series Of ____ Company Letterhead Omnibus Sworn Statement Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) _________________________________________________________________________ Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections, As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections, As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase). 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 2024 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ And Issued On ____________________ At _____________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Certificate Of Net Financial Contracting Capacity Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (please Show Figures At How You Arrived At The Nfcc) This Is To Certify That Our Net Financial Contracting Capacity (nfcc) Is _____________________ (p____________) Which Is At Least Equal To The Total Ceiling Price We Are Bidding. The Amount Is Computed As Follows: (please Show Computation Of Nfcc) Nfcc = (ca-cl) (15) – C Where: Ca = Current Assets Cl = Current Liabilities C = Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Going Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project Note: The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Audited Financial Statement Submitted To The Bir. Issued This _________________day Of ________________, 2024 _______________________________________________ Name & Signature Of Authorized Representative ____________________ Position _______________ Date Company Letterhead Bid Form Date: Ib No: To Bids And Awards Committee Bureau Of Corrections Nbp Reservation Muntinlupa City We, The Undersigned, Declare That: (a) We Have Examined And Have No Reservation To The Bidding Documents, Including Addenda, For The Contract Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (b) We Offer To Execute The Works For This Contract In Accordance With The Bid And Bid Data Sheet, General And Special Conditions Of Contract Accompanying This Bid; The Total Price Of Our Bid, Excluding Any Discounts Offered Below Is: ________________________________________₱_________________; The Discounts Offered And The Methodology For Their Application Are: [insert Information]; (c) Our Bid Shall Be Valid For A Period Of 120 Calendar Days From The Date Fixed For The Bid Submission Deadline In Accordance With The Bidding Documents, And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period; (d) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of 30% Percent Of The Contract Price For The Due Performance Of The Contract; (e) Our Firm, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Have Nationalities From The Following Eligible Countries; (f) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (g) Our Firm, Its Affiliates Or Subsidiaries, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Has Not Been Declared Ineligible By The Funding Source; (h) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (i) We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Other Bid That You May Receive. (j) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections. (k) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be A Ground For The Rejection Of Our Bid. Name: In The Capacity Of: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________
Closing Date20 Jan 2025
Tender AmountPHP 300 Million (USD 5.1 Million)
BARANGAY TETUAN, ZAMBOANGA CITY Tender
Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Philippines
Details: Description Republic Of The Philippines Barangay Tetuan Bids And Awards Committee Tetuan 24-0021 M. Nativitad, St., Zamboanga City Invitation To Bid For Supply And Delivery Of 1 Lot Various Disaster Equipment (name Of Project) 1. The City Government Of Zamboanga, Through The Annual Budget 2024 Under Other Maintenance And Operarting Expenses (omoe) Intends To Apply The Sum Of Two Hundred Sixteen Thousand Three Hundred Fifty Pesos (p 216,350.00) Only Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Supply And Delivery Of The Purchase Of One (1) Lot Various Disaster Equipment Pr No. 24-06-069 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The City Government Of Zamboanga Now Invites Bids For The Supply And Delivery Of The 1 Lot Various Disaster Equipment The Sol. Goods Is Required By Ten (10) Calendar Days Bidders Should Have Completed Within A Period Of Ten (10) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project, With A Value Of At Least (50%) Of The Abc And To Meet Other Eligibility Requirements Stated In The Eligibility Documents. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Prospective Bidders May Obtain Further Information From Barangay Hall Of Tetuan In The Office Of The Bids And Awards Committee And Inspect The Bidding Documents At The Address Given Below During 8:00 Am To 5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 03-08, 2025 From The Given Address And Website/s Below And Upon Payment Of A Non-refundable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of P500.00the Method Of Payment Will Be Cash Payable To The Barangay City Treasurer’s Office. The Bidding Documents Shall Be Received Personally By The Prospective Bidder Or His/her Authorized Representative. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees “machine Copy Of The Official Receipt” Not Later Than The Submission Of Their Bids. 6. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission On Or Before January 09, 2025 At 10:00 Am At Office Of The Bids And Award Committee, Conference Room, M. Natividad St., Zamboanga City.late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. All Bids Must Be Accompanied By A Bid Security Which Shall Be A Bid Securing Declarationor At Least One Other Form Of The Following: Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Confirmed By A Universal/commercial Bank, Irrevocable Letter Of Credit Issued By A Universal/commercial Bank Or From Other Bank Certified By The Bangko Sentral Ng Pilipinas As Authorized To Issue Such Financial Instrument, Provided However That It Shall Be Confirmed Or Authenticated By A Universal/commercial Bank If Issued By A Foreign Bank In The Amount Of P1,230.00or Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security In The Amount Of P3,075.00or Any Combination Of The Foregoing In The Amount Proportionate To Share Of Form With Respect To Total Amount Of Security. The Bid Security Shall Be Denominated In Philippine Pesos And Posted In Favor Of The Procuring Entity. Bidders Are Required To Indicate The Brand Name And/or Name Of Manufacturer Of Goods Offered/quoted, When Appropriate. 8. Bid Opening Shall Be On January 13, 2025 At 10:00 Am At Office Of The Bids And Awards Committee, Conference Room, M. Natividad St., Zamboanga City. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend The Activity. 9. To Be Delivered In The Barangay Hall Of Tetuan. 10. The Brangay Council Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules Or Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. Bidders Are Advised To Use The Bid Form At The Back Of This Itb. Failure To Do So Would Lead To Non-acceptance Of The Bid. 12. For Further Information Please Refer To: Hazel Jane L. Fox Bac Secretariat Barangay Government Of Tetuan M.natividad Street, Zamboanga City Brgytetuan@gmail.com Tel. No. (063) 993-0269 Republic Of The Philippines Barangay Tetuan Bids And Awards Committee Tetuan 24-0021 M. Natividad Street, Zamboanga City Bid Form Date: ____________________ To: Barangay Council Of Tetuan Address: M. Natividad Zamboanga City Having Examined The Philippine Bidding Documents (pbds) Including The Supplemental Or Bid Bulletin Numbers Including Bid Bulletin Numbers Tetuan 24-0021 The Receipt Of Which Is Hereby Duly Acknowledge, We, The Undersigned, Offer To Supply/deliver/perform The Delivery And Supply Of The 1 Lot Various Disaster Equipment Inconformity With The Said Philippine Bidding Documents (pbds) For The Sum Of (total Bid Amount In Words And Figures) Or The Total Calculated Bid Price, As Evaluated And Corrected For Computational Errors, And Other Bid Modifications In Accordance With The Price Schedules Attached Herewith And Made Part Of This Bid. The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: [specify The Applicable Taxes, E.g. (i) Value Added Tax (vat), (ii) Income Tax’ (iii) Local Taxes, And (iv) Other Fiscal Levies And Duties], Which Are Itemized Herein Or In The Price Schedules, If Our Bid Is Accepted, We Undertake: A. To Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements Of The Philippine Bidding Documents (pbds); B. To Provide A Performance Security In The Form, Amounts, And Within The Times Prescribed In The Pbds; C. To Abide By The Bid Validity Period Specified In The Pbds And It Shall Remain Binding Upon As At Any Time Before The Expiration Of That Period. [insert This Paragraph If Foreign-assisted Project With The Development Partner: Commissions Or Gratuities, If Any, Paid, Paid Or To Be Paid By Us To Agents Relating To This Bid, And To Contract Execution If We Are Awarded The Contract, Are Listed Below: Name And Address Amount And Purpose Of Agent Currency Commission Or Gratuity (if None, State “none”)] Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And Your Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Bid You May Receive. We Certify/confirm That We Comply With The Eligibility Requirements Pursuant To The Pbds. The Undersigned Is Authorized To Submit The Bid On Behalf Of ________________________________________________________ (name Of Bidder) As Evidenced By The Attached ______________________________________________________________________. (state The Written Authority) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Attached Schedule Of Prices, Shall Be A Ground For The Rejection Of Our Bid. Name: _________________________________________________________________________ Legal Capacity: __________________________________________________________________ Signature: ______________________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: _________________________________________ Date:__________________________ Price Schedule For Goods Name Of Bidder _____________________________________________________ Tetuan 24-0021 Page 1 Of 1 2 3 4 5 6 7 8 9 10 Item 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. Life Boat Ring Rescue Can With Harness Rescuer’s Throw Bag Rescuer Shovel Rescue Rope 12mmx 50mm Rescue Rope 12 Mm X 100mm Rescue Rain Coat Rescue Booths Big First Aid Kit Rechargeable Flashlights Chainsaw 7m’ Breathable Reflectorized Vest Safety Helmet Safety Glasses Megaphone Fire Extinguisher Small First Aid Kit 4x4 Tent Ambulance Collapsible Stretcher Adult Wheelchair Solar Flood Light 300w Country Of Origin Quantity 2 2 1 2 2 2 10 10 4 10 1 10 4 4 2 4 11 4 1 4 12 Unit Price Exw Per Item Transportation And All Other Costs Incidental To Delivery, Per Item Sales And Other Taxes Payable If Contract Is Awarded, Per Item Cost Of Incidental Services, If Applicable, Per Item Total Price, Per Unit (col 5+6+7+8) Total Price Delivered Final Destination (col.9) X (col 4) Purpose: For Barangay Tetuan Disaster Preparedness Name: _________________________________________________________________________ Legal Capacity: __________________________________________________________________ Signature: ______________________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: ________________________________________ Date: ________________________________ Schedule Of Requirements The Delivery Schedule Expressed As Days/weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Total Delivered, Days/weeks/months ________________________ Signature Over Printed Name Technical Specifications Brand Name Statement Of Compliance Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] __________________________ Signature Over Printed Name Schedule Of Warranty This Serves As Warranty For _______________________________________________ In The Barangay Government Of Tetuan. Item No. Description Quantity Warranty _____________________________ Bidder Signature Over Printed Name Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Supply / Delivery Of The 1 Lot Various Disaster Equipment B. Completed Within Ten (10) Years Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 “subcontracting Is Not Allowed.” 12 The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) At Cgso, Tetuan, Zamboanga City For This Project . 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than P1,230.00; If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than P3, 075.00; If Bid Security Is In Surety Bond. 19.3 The Project Shall Be Awarded One Project Having Several Items That Shall Be Awarded As One Contract. 20.2 [list Here Any Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It.] 21.2 [list Here Any Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity.] Special Conditions Of Contract Gcc Clause 1 [list Here Any Additional Requirements For The Completion Of This Contract. The Following Requirements And The Corresponding Provisions May Be Deleted, Amended, Or Retained Depending On Its Applicability To This Contract:] Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: [for Goods Supplied From Abroad, State:] “the Delivery Terms Applicable To The Contract Are Ddp Delivered [indicate Place Of Destination]. In Accordance With Incoterms.” [for Goods Supplied From Within The Philippines, State:] “the Delivery Terms Applicable To This Contract Are Delivered Barangay Hall Of Tetuan, Zamboanga City. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is [indicate Name(s)]. Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: Select Appropriate Requirements And Delete The Rest. A. Performance Or Supervision Of On-site Assembly And/or Start-up Of The Supplied Goods; B. Furnishing Of Tools Required For Assembly And/or Maintenance Of The Supplied Goods; C. Furnishing Of A Detailed Operations And Maintenance Manual For Each Appropriate Unit Of The Supplied Goods; D. Performance Or Supervision Or Maintenance And/or Repair Of The Supplied Goods, For A Period Of Time Agreed By The Parties, Provided That This Service Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And E.training Of The Procuring Entity’s Personnel, At The Supplier’s Plant And/or On-site, In Assembly, Start-up, Operation, Maintenance, And/or Repair Of The Supplied Goods. F. [specify Additional Incidental Service Requirements, As Needed.] The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Spare Parts – The Supplier Is Required To Provide All Of The Following Materials, Notifications, And Information Pertaining To Spare Parts Manufactured Or Distributed By The Supplier: Select Appropriate Requirements And Delete The Rest. A. Such Spare Parts As The Procuring Entity May Elect To Purchase From The Supplier, Provided That This Election Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And B.in The Event Of Termination Of Production Of The Spare Parts: I.advance Notification To The Procuring Entity Of The Pending Termination, In Sufficient Time To Permit The Procuring Entity To Procure Needed Requirements; And Ii.following Such Termination, Furnishing At No Cost To The Procuring Entity, The Blueprints, Drawings, And Specifications Of The Spare Parts, If Requested. The Spare Parts And Other Components Required Are Listed In Section Vi (schedule Of Requirements) And The Cost Thereof Is Included In The Contract Price. The Supplier Shall Carry Sufficient Inventories To Assure Ex-stock Supply Of Consumable Spare Parts Or Components For The Goods For A Period Of Three (3) Months. If Not Used Indicate A Time Period Of Three Times The Warranty Period]. Spare Parts Or Components Shall Be Supplied As Promptly As Possible, But In Any Case, Within [insert Appropriate Time Period] Months Of Placing The Order. Packaging – The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. The Packaging, Marking, And Documentation Within And Outside The Packages Shall Comply Strictly With Such Special Requirements As Shall Be Expressly Provided For In The Contract, Including Additional Requirements, If Any, Specified Below, And In Any Subsequent Instructions Ordered By The Procuring Entity. The Outer Packaging Must Be Clearly Marked On At Least Four (4) Sides As Follows: Name Of The Procuring Entity Name Of The Supplier Contract Description Final Destination Gross Weight Any Special Lifting Instructions Any Special Handling Instructions Any Relevant Hazchem Classifications A Packaging List Identifying The Contents And Quantities Of The Package Is To Be Placed On An Accessible Point Of The Outer Packaging If Practical. If Not Practical The Packaging List Is To Be Placed Inside The Outer Packaging But Outside The Secondary Packaging. Transportation – Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip, Or Ddp, Transport Of The Goods To The Port Of Destination Or Such Other Named Place Of Destination In The Philippines, As Shall Be Specified In This Contract, Shall Be Arranged And Paid For By The Supplier, And The Cost Thereof Shall Be Included In The Contract Price. Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Goods Are To Be Transported On Carriers Of Philippine Registry. In The Event That No Carrier Of Philippine Registry Is Available, Goods May Be Shipped By A Carrier Which Is Not Of Philippine Registry Provided That The Supplier Obtains And Presents To The Procuring Entity Certification To This Effect From The Nearest Philippine Consulate To The Port Of Dispatch. In The Event That Carriers Of Philippine Registry Are Available But Their Schedule Delays The Supplier In Its Performance Of This Contract The Period From When The Goods Were First Ready For Shipment And The Actual Date Of Shipment The Period Of Delay Will Be Considered Force Majeure. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Intellectual Property Rights – The Supplier Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 2.2 [if Partial Payment Is Allowed, State] “the Terms Of Payment Shall Be As Follows: _____________.” 4 The Inspections And Tests That Will Be Conducted Are: Quality Inspection By Accounting, Coa, Cgso And End User. Republic Of The Philippines) City Of _____________________) S.s Bid Securing Declaration Invitation To Bid No.: [insert Reference Number] To: Barangay Government Of Tetuan, Bids And Awards Committee M. Natividad Street, Tetuan Zamboanga City I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid Securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f),of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: A. Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; B. I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And; C. I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ___ Day Of [month][year] At [place Of Execution]. [insert Name Of Bidder Or Its Authorized Representative [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Latest Rules On Notarial Practice] Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, Barangay Council Of Tetuan Wishes To Receive Bids For The Supply And Delivery Of The 1 Lot Various Disaster Equipment With Tetuan 24-0021 The Procurement Project (referred To Herein As “project”) Is Composed Of The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For The Annual Budget 2024 Under The Other Maintenance And Operating Expenses (omoe) In The Amount Of Two Hundred Sixteen Thousand Three Hundred Fifty Pesos ( 216,350.00) 2.2. Nga, The General Appropriations Act Or Special Appropriations. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2.b Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. B. For The Procurement Of Expendable Supplies: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty-five Percent (25%) Of The Abc. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts The Procuring Entity Has Prescribed That: Subcontracting Is Not Allowed. 8. Pre-bid Conference No Pre-bid Conference 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within Ten (10) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In E. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In Section Vii (technical Specifications). 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2. Payment Of The Contract Price Shall Be Made In Philippine Pesos. 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty Days [120]. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On January 09, 2025 At 10:00 Am At Barangay Hall, Conference Room, M. Natividad St., Zamboanga City As Indicated In Paragraph 6 Of The Ib. 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids On January 13, 2024 At 10:00 Am At Barangay Hall, Conference Room, M. Natividad St., Zamboanga City As Specified In Paragraph 8 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded One Project Having Several Items That Shall Be Awarded As One Contract. 19.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20. Post-qualification 20.2. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds.
Closing Date13 Jan 2025
Tender AmountPHP 216.3 K (USD 3.7 K)
Standard Chartered Bank Tender
Auction
Real Estate Service
India
Tender Id: scbmumbRaijn Solar | All That Piece And Parcel Of The Property Office No. 501 Adm.1821 Sq.ft On 5th Floor In The Scheme Anand Mangal Complex-iii, Ashwamegh Avenue Coop Housing Society Ltd. Constructed On T. P Scheme No. 3/5 , F. P. No.739 Of Mouje Chhadavad, Sub District Ahmedabad-3 (memnagar) & District Ahmedabad.
Closing Date17 Jan 2025
Tender AmountRefer Documents
Municipality Of Mercedes, Camarines Norte Tender
Solar Installation and Products...+1Electrical and Electronics
Philippines
Details: Description Republic Of The Philippines Province Of Camarines Norte Municipality Of Mercedes Bids And Awards Committee Bids And Awards Committee Office, Lgu - Mercedes, Camarines Norte Invitation To Bid For Purchase Of Various Supplies/materials And Equipment, Livelihood Program: Providing Resources For Opportunities And Prosperity Through Empowerment In Lgu-mercedes, Camarines Norte. The Local Government Unit Of Mercedes, Camarines Norte, Through The Trust Fund Intends To Apply The Sum Of Two Million Seven Hundred Twenty-five Thousand Two Hundred Sixty-six Pesos Only (php2,725,266.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Purchase Of Various Supplies/materials And Equipment, Livelihood Program: Providing Resources For Opportunities And Prosperity Through Empowerment In Lgu-mercedes, Camarines Norte - Identification Number 401-24-11-1495/1496/1497/1498/1499. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Local Government Unit Of Mercedes, Camarines Norte, Now Invites Bids For The Purchase Of Various Supplies/materials And Equipment, Livelihood Program: Providing Resources For Opportunities And Prosperity Through Empowerment In Lgu-mercedes, Camarines Norte As Follows: Item No. Qty Unit Description Lot 1 - Hardware Tools 1 1 Unit Air Compressor Machine, Motor: 1/2 Hp; No. Of Cylinder: 2; Phase: 1; Pressure: 85 Psi; Capacity 46 Liters; Approximate Dimension: 95-100cm (l) X 31-35cm (w) X 64-70cm (h); Weight: 47kg; Inflation Time: 53min; Air Displacement: 208l/min 2 1 Unit Air Spray Gun, Standard Nozzle:1.4mm, Pattern Width:180-250mm, Paint Capacity:600cc, Suitable For Finishing Coat, Optional Nozzle:1.3-2.5mm, Operating Pressure:2-3.5bar Air Cons:4.2-7.1cfm(119-200l/min)" 3 11 Set Angle Grinder Cutting Disk, 10 Pcs.per Set; Dimensions: Approx. 105mm (4") X 1.2mm (3/64"') X 16mm (5/8") 4 11 Unit Angle Grinder, Rated Input Power: 730w; Wheel Diameter: 4"; Rated Voltage: 220v; Frequency: 60hz; No Load Speed: 12,000 Rpm; Weight: Approximately 1.6kg; Grinding Spindle Thread: M10; Disc Diameter: 100mm X 1 X 16mm, Dimension: 298mm (l), 77mm (w), 102mm (h) 5 7 Pc Chipping Hammer, Item Weight: atleast 13.8 Ounces; Product Dimensions: 11" (l) X 1" (w) X 7.5" (h); Material:, Genuine Leather Grip And Forged Steel 6 3 Set Circular Saw With Diamond Blade, 1400w, 185 Mm Blade, Spindle Lock With 24t Diamond Blade 7 3 Pc Claw Hammer, Head Weight: 16oz; Overall Weight: 17oz-23oz; Forged Steel Head; Smooth Face; Fiberglass Handle With Rubber Cushion; Overall Length: 12-14" 8 3 Pc Concrete Chisel, 10'' Forged Steel Chisel 9 3 Pc Crow Bar, 36" Long; Length Tolerance: +- 1/8; Forged Steel Carbon 10 1 Pc Electric Planer; Voltage: 220-240v; Input Power: 1050w; No Load Speed: 1600rpm; Planing Width And Depth: 82x3mm; Heavy Duty Aluminum Base; 11 1 Pc Framing Hammer, Handle Material: Alloy Steel; Item Dimensions: Approximately 16-17" (l) X 5.75-6" (w) X 1.5-2" (h); Item Weight: Atleast 1.4 Pounds 12 1 Unit Gasoline Marine 7hp Speed Type, Single Cylinder; 4 Stroke, Forced Air Cooling; Ohv Displacement (cc): 196 Compression Ratio: 8.5:1 Bore X Stroke (mm): 68x54 Min. Fuel Consumption;395/(kw.h) Valve Clearance: Input Valve: 0.10-0.15mm Idle Speed (rpm): 1400+-140 Max A.c. Output/rpm:3.8/3600 Noise Level:70db (a) Ignition System: Transistorize Magento Ignition Max Torque (n.m/rpm): 10.7/300 Starting System: Recoil Start (recoil Start/electric Starting) 13 10 Pc Hacksaw With Blade, Adjustable Aluminun Alloy Frame With Soft-grip Handle, 90" Adjustable Bladec Angle, 12 Inches (+/- 1/4") Bi-metal Hacksaw Blade, 24 Tpi 14 10 Unit Heavy Duty Corded Drill, Rated Input Power: 750w; Chuck Capacity: Upto 13mm; Drill Capacity: Metal (16mm), Wood (25mm), Masonry (12mm); Dimension: 268mm (l) X 69mm (w) X 192mm (h); Weight W/out Cable: Approximately 1.6-1.8 Kg; Spindle Collar Diameter Of 43 Mm 15 1 Pc Level, Box Beam Style, Material: Alluminum; Dimension: Approximately 24-24.5" (l) X 2-2.6" (w) X 1.2-1.5" (h); Weight: Atleast 0.8 Pounds 16 3 Pc Mashing Hammer, 3 Lb With Fiberglass Handle, Forged Steel Head 17 3 Pc Masonry Hammer, 800g Solid Rubber Head, Fiberglass Core And Bi-material Slip-resistant Handle, 18 3 Pc Masonry Hand Saw, 15" 380mm Carbon Steel 19 3 Pc Masonry Square, 24"x 16"aluminum, 1/8 '' Thick 20 3 Pc Mason's Level, 60cm Aluminum Reinforced Frame 21 3 Tube Mason's Line, #18 Braided Nylon, 500 Ft, 170 Lb Test 22 10 Set Metal Drill Bit Set, Material: High Speed Steel; 19pcs Per Set (1mm,1.5mm,2mm,2.5mm,3mm,3.5mm,4mm,4.5mm,5mm,5.5mm,6mm,6.5mm,7mm,7.5mm,8mm,8.5mm,9mm,9.5mm,10mm); Point Angle:118degree C; Standards: Din 338; Bit Geometry: Standard Twist Bit 23 8 Pc Meter Tape With Magnetic Hook, Blade Material: Nylon Coated Blade; Dimensions: 16ft (l) X 25mm (w) 24 7 Pc Mig Welding Pliers, Overall Length: Atleast 210mm; Material: High Carbon Steel; Handle Material: Thermoplastic Rubber 25 1 Unit Portable Hand Drill, Power Sourced: Battery Powered - 2pc 21 Volt 1500mah Lithium-ion Batteries; Maximum Rotational Speed: 1500 Rpm; Voltage: 21v; Amperage: 1.5 Amps; Chuck Size: 0.38"; Bit Heads Diameters: From 0.8mm - 10mm; Product Dimensions: 9.6" (l) X 2.1" (w) X 7.5" (h); Material: plastic, Rubber, Metal; Item Dimensions: Approx. 9.6" (l) X 2.1" (w) X 7.5" (h); Item Weight: Atleast 2.5 Pounds; Item Torque: 330 Inch Pounds; Inclusions: 1x21 Volt Inspiritech Cordless Power Drill, 2x Rechargeable Battery, 1x English User Manual, 10x Self-drilling Drywall Anchors,10x Screwdriver Bits, 2x Double Ended Bits, 3x Drilling Bits, 1x Magnetic Extension Socket Bit Holder, 10x Anchors With Screws,1x One-hour Fast Charger, 1x Flexible Extension Shaft, 1x Carrying Bag 26 7 Unit Portable Welding Machine, Input Voltage: 220-240; Frequency: 50-60hz; Output Current: 10-220a; Led Display; No-load Voltage: 85v; Max. Output Current: 220a; Diameter Of Electrode: 1.6-3.2mm; Inclusions: 1 Pc Electrode Holder, 1 Pc Earth Clamp With Cable, 27 3 Pc Pull-push Rule, Blade Length 8m/26ft, Blade Width 1", High Impact Abs Case With Durable Rubber, Corrosion Resistant Tru-zero End 28 3 Pc Putty Knife, 3" Stainless Steel With Rubber Handle 29 1 Pc Roofing Hammer: Item Weight: 1.25 Pounds; Product Dimensions: Approx. 13.7" (l) X 6.75" (w) X 1.5" (h) 30 1 Unit Sander, Item Dimensions: Approx 11.63" (l) X 5.63" (w) X 6.19" (h); Voltage: 110 Volts; Power Source: Corded Electric; Amperage Capacity: 8.8 Amps; Variable Speed Control Dial (690 -1,440 Ft./min.); Grit Number: 80; Item Weight: Atleast 9.5 Pounds; Included Components: belt Sander, 1 Belt, Dust Bag 31 3 Pc Shovel, Rectangular End, Tempered Steel Blade (0.8mm Gauge Orv Higher), 17-23 Cm Blade Tip Width,22-28cm Blade Tip Lenght, All Metal Handle, Overall Lenght 100cm-115 Cm 32 3 Pc Shovel, Round End, Tempered Steel Blade (0.8mm Gauge Orv Higher), 17-23 Cm Blade Tip Width,22-28cm Blade Tip Lenght, All Metal Handle, Overall Lenght 100cm-115 Cm 33 1 Pc Speed Square, Material: Cast Aluminum; Size: About 18x18x2cm/7.09x7.09x0.79"; Weight: About 130g; Triangle-shaped 34 3 Pc Spirit Level Bar, Aluminum Frame With Magnet, Size 12" (+-1/8"), With 3 Vials (horizontal, Vertical And 45 Degrees) 35 3 Pc Steel Float/plastering Trowel, Thickness 0.7 Mm, Surface Measurement 280mm X 125 Mm(+/- 1mm), High Carbon Steel, Soliod Forged Steel With Plastic Handle 36 1 Pc Trim Hammer, Handle Material: Wood; Head Material: Alloy Steel; Item Dimensions Approximately: 14-15" (l) X 5-6"(w) X 1-2" (h); Item Weight: Atleast 594 Grams 37 3 Pc Trowel, 280x120mm Stainless Plastering Trowel With Plastic Handle 38 1 Pc Utility Knife, Handle Material: Aluminum; Material: Aluminum Alloy; Weight: 120g/pcs; Blade Size: 19mm (w) X 61mm (h) X 0.6mm (t); Blade Material: Steel; Thickness: Atleast 0.6mm 39 7 Pc Welding Helmet, Auto Darkening Helmet, Power Supply: Battery And Solar Powered; Light Shade: Din9-1;, Dark Shade: Din4; Switching Time: 1/25000s; Delay Time: 0.1-0.8s; Sensitivity Adjustment: Stepless Control; Operation Temperature: -5 Degrees- 55 Degrees; Active Viewing Area: 93mmx43mm; Active Viewing Area Size: (+/- 10mm); Item Weight: Atleast 1.85 Pounds; Package Dimensions: approximately 12-12.4" (l) X 9-9.61" (w) X 7-7.68" (h) 40 7 Set Welding Magnets, 6 Pcs/set, Overall Length: Atleast (3"); Hold Capacity: Up To 25lbs; Arrow Design Supports Angle: 45°, 90°, And 135°; Item Weight: 295g; Package Dimensions: 4.88 X 4.72 X 3.98 Inches; material: Steel; Magnets Size: Approximately - Top (1-1.4cm), Bottom (6.5-7cm), Side (7-7.5cm) Thickness (1-1.3cm) 41 1 Set Wood Chisel; 4-piece Set (6mm; 12mm; 19m; 25mm); Tempered Chrome Carbon Steel Blade; Hardened Shank; Rust-resistant, Lacquered Coated Blade; Bi-material Handle 42 3 Pc Wooden Float, 18"x 32", Multi-layered Lot 2 - Food Preparation 1 1 Unit 3 In 1 Burger Griller With Deep Fryer And Steamer, Gas Type; Made Of Stainless Steel And Polished Metal Griddle Plate; Dimensions: Burger Griddle - 18" (l) X 12" (w); Deep Fryer - 8" (l) X 12" (w), Capacity: 2.5 L; Steamer: 11" (l) X 12" (w) 2 6 Unit Barbeque Grill With Sauce Holder And Top Grill, Material: Stainless Steel, Dimension(lwh): 24 In X 12 In X 30 In (3.5 In Grill Pan's Depth) 3 33 Pc Basin; Stainless; Diameter: 22"; Base: 16"; Depth: 7"; Thickness: 1cm 4 47 Pc Beach Umbrella; Round-shaped; Material: Poly Canvass; Diameter: 40""; Pole Stand Length: At Least 45""; Pole Material: Stainless Steel Chrome" 5 6 Pc Boiler Caldero; Big Size & Heavy Duty; Size: Diameter 48cm; Height: 42cm; Makapal, Material: Aluminum 6 6 Pc Boning Knife, 27.3cm, Blade Length:14.6cm, Blade Thickness: 4mm, Wood Handle 7 32 Pc Butcher's Knife; Materials: Stainless; Wood Handle; Size: About 10" 8 29 Pc Caldero With Double Handle; Aluminum Material; Diameter: 46cm; Height: 37cm; With Double Handle; Capacity 5kilos/20l(volume Capacity) 9 48 Set Casserole Set, Stainless Steel, 28, 30 And 32cm Diameter; 16, 18, 20cm Height 10 50 Pc Chef's Knife; About 10 3/4" Long; Material: Stainless Steel; Blade: Full Tang; Riveted Handle 11 56 Pc Chest Cooler, Item Package Dimensions: 25.8" (l) X 16.2" (w) X 15.7" (h), Package Weight: 5.76kg, Inside Dimensions: 24.95" (l) X 14.58" (w) X 14.77" (h), Material: plastic, Chamber Depth: 24.95", Capacity: 52l, Color: Any Color 12 51 Pc Chopping Board; Thick Wood; 12"x12" 13 6 Pc Cleaver Knife, 11" Stainless Steel, Weight: 310-340g, Blade Size: 6.5 Inches 14 48 Pc Colander; Stainless Steel; 11"diameter; With Stainless Base And Handle 15 6 Unit Digital Weighing Scale ,30kg Capacity,stainless Tray Size: 35x23cm For 30kg Capacity Weighing Scale, Dual - Display : Weight, Unit Price, Amount, High Light Led Display, Rechargeable Battery, Power Supply: Ac/dc Charger (included) 16 47 Unit Double Burner Gas Stove; Stainless Top And Front; Automatic Ignition; Reversible Trivet; Double Detachable Top Burner; Removable Drip Pan; Dimension: 700mm(l) X 390mm(w) X 140mm(h) 17 7 Unit Double Ring Burner; Heavy-duty Cast Iron; Includes Pol Regulator And 1-metre Hose 16750 Btu Brass Valve With Individual Gas Control Minimal Assembly Required Weight; 3.9kg, Material;cast Iron, Dimensions: (lwh) 36cm X 20cm X 9cm, Fuel Type: Lpg Tank Cylinder With Content And Accessories 18 2 Pc Egg Ring, Stainless Steel, 8.5cm Diameter, 1.5cm Height 19 4 Box Face Masks; 3 Ply Non-woven Disposable Earloop Mask; Quantity: 50pcs/box 20 30 Pc Fish Drying Rack, 4-layer, 45x45x66cm, Foldable 21 6 Pc Fish Scaler, 20cm Stainless Steel 22 6 Pc Fish Scraping Tool, 20cm Stainless Steel 23 54 Unit Food Shelve, 2 Layers: Glass Thickness: 3/16 And 1/4, (w-14" X H-17" X L-30"); Adjustable Layer, Material: Glass & Aluminum With Sliding Door, Offer: Screen Sliding Door To Prevent Moisture 24 204 Pc Food Tray With Glass And Stainless Lid/cover, Stainless Body, Rubberized Stand 32x28x10cm 25 12 Pc Food Tray, Flat, Stainless, 60x40x2cm, Depth: 2cm 26 2 Unit Freezer Chest Type, Gross / Net Volume 10.6 Cu.ft. (10 Liters) / 10.1 Cu.ft. (286 Liters), Functionality 3-in-1 Function – Chilling | Freezing | Fast Freezing, Defrosting System: Manual Defrost, Evaporator:aluminum Defrost,led: 6 Led’s, P:2w, Lamp Life: Min. 50,000 Hours, Weight 40 Kg, Dimensions L 63 X W 111.4 X H 84.7 (cm), Key Features: Inverter Compressor, Sliding Glass Door, Embossed Door & Cabinet, Recessed Side Handle (left & Right), Led Light, Removable Gasket , 1x Basket Wire Shelf, 4x Roller Wheel 27 5 Pc Fruit Crate Plastic 21 X 15 X 12 Inches, Heavy Duty Plastic Material, Color : Black 28 37 Pc Frying Pan 14" In Diameter, Cast Iron 29 4 Unit Gas Range, Approx. 55-70cm (l) X 50-60cm (w) X 86-93cm (h); 4-gas Burner; 62l Gas Oven; Button Ignition; Top Glass Lid; Net Weight: Maximum Of 28kg; Pan Support: Light Cast Iron Pan Support 30 1 Box Gloves; 100pcs; Food Grade; Size: Medium(7.5cm); Thermoplastic Elastomer(tpe) Material 31 23 Pc Hairnet With Cap; White; Nylon; Washable 32 1 Unit Industrial Oven Stainless Steel, With Wall Insulator To Minimize Penetration Of Heat To The Walls, With Temperature Gauge, Approx. Outer Dimension: 46.5 X 23.5 X 30 Inches; Oven Stand/rack Is Made Of Metal With Rollers And Braking Systems; Stainless Steel Front Panel, With See Thru Glass; About 4 Inch Thickness Of Walls With 2 Trays Per Deck - 4 Trays Capacity; Gas Type 33 35 Pc Kawa 62 Cm Diameter 18 Cm Height, Aluminum With 2 Aluminum Handles 34 12 Pc Kitchen Apron, Waterproof; Stain Resistant Leather Apron 35 6 Pc Kitchen Scissors, Material: Stainless Steel And Plastic Silicone, Size: 22.5x7.3x1.2cm 36 3 Pc Long Handle Stainless Steel Soup Spoon; Color: Silver; Caliber Length; Approx. 12cm.14cm.16cm.18cm, Handle Length; Approx.45cm(17.72inches) 37 6 Pc Long Wooden Ladle; 14" Stainless Steel 38 58 Set Lpg Tank, 11kg Cylinder With Gas Regulator, 1.8m Hose & Steel Hose Clamp 39 9 Set Measuring Cup (set For Liquid), 1 Measuring Cup With Red Graphics; Made Of Nonporous Glass That Won't Warp, Stain, Or Absorb Odors; Glass Is Preheated Oven, Microwave, Fridge, Freezer & Dishwasher Safe; Dimension: Approx. 7.13" (l) X 6.75" (w) X 4.38" (h); Measuring Capacity: 500ml 40 9 Set Measuring Cups (set For Dry), Smithcraft Stainless Steel Measuring Cups Set Have 8 Cups.the Sizes Are: 1 Cup (240ml), 3/4 Cup (180ml), 2/3 Cup (160ml), 1/2 Cup (120ml), 1/3 Cup (80ml), 1/4 Cup (60ml), 1/8 Cup (30ml), 1/16 Cup (15ml),1 Locking Ring. 41 6 Unit Mini Electric Fan 7.5" - With Base 10'' 69hz 20w (for Bbq), Non-adjustable Height; Any Color; Electric Powered Fan; 3 Blade 42 21 Pc Mixing Bowl Medium, Approx. Diameter: 28cm, Height:11.2cm; Material: Stainless; Capacity: Atleast 4l 43 200 Pc Monoblock Chair Front:monoblock Chair, Front Legs Distance: 355mm Width Seat, With Backrest, Color: Beige, Seat Width :375 Mm, Deapth: 330 Mm, Side Legs Distance Left: 378 Mm, Side Legs Distance Right 378 Mm, Back Legs Distance: 210 Mm, Back Rest Height:779 Mm, Set Back Height: 405 Mm, Seat Height: 376 Mm, Gross Weight: 2.25 Kgs 44 54 Pc Monoblock Table, 36x36 Inches, H- 28 Inches, Color: Beige, Atleast 3mm Thick 45 2 Pc Non-slip Rectangular Chopping Board; Materials:polypropylene Plastic; Approx Length: 40cm; Width: 25cm; Thickness: 0.5cm; Color : White 46 45 Pc Palamigan Container W/ Gripo 15l, Dimension: 31.8x23.8x48.5cm, Material: High Quality Durable Plastic 47 1 Unit Pressure Cooker 50 Liters Capacity, Aluminum Alloy Material, Pressure: 90kpa, Dimension: 44cm Diameter X 47cm Height 48 40 Pc Round Glass Jars With Lid, 220ml 49 41 Pc Sandok, Stainless Steel, 24.7" Length, With Wooden Handle 50 33 Pc Sandok, Stainless Steel, Length: 14" 51 39 Pc Shansi, Stainless Steel, Length: 14" 52 9 Pc Stainless Steel Dough Cutter Scraper Baking Smoother Cake , Approx. Size: 14-15cm (l) X 11.5-12cm (w) And 22cm (h); Material: Stainless Steel 53 41 Pc Stainless Steel Food Tong 14" Length 54 5 Unit Steamer; Aluminum; About 16"/42cm Diameter; 3 Layers With Cover; With Handle Per Layer 55 3 Unit Vacuum Sealer Machine, 220v, 90w, Sealing Width: 270mm, Power Supply: Ac100-240v/50-60hz, Temperature Control Range: 170-210 Celsius, Abs Material, Size: 370*75*50 (mm) 56 15 Pack Vacuum Sealer Storage Pouches | Bpa Free, Commercial Grade For Food Storage & Sous Vides, Size: 17 X 25cm Material: Plastic, 100pcs/pack 57 27 Pc Water Jug/dispenser With Faucet, 5 Gallons, 20 Liters, Color: Blue, Durable And High Quality Plastic Material 58 7 Unit Weighing Scale; Analog; 20kg Capacity; Approx. Dimensions: 6-7" (l); 8-9" (w); 10-11" (h); Dual Unit (kg And Pounds) 59 2 Pc Wide Mouth Funnel, Stainless Steel, Top Opening: At Least 17 X 5.5 X 6cm, Bottom Opening: At Least 13 X 3.7 X 4cm 60 8 Pc Wire Whisk, Large, Stainless, Approx. 14-15" (l) Lot 3 - Fabrication Of Food Cart 1 7 Unit Bicycle With Sidecar: Bicycle Specifications: Bmx Type Bike (frame 1//2 Gi Hd, Rim Set Front X 10 G Wide Jap Hub, Rim Set Rear X 10g Wide Jap Hub, Tire 20 X 2.125 Jumbo, Tube 20 X 2.125, Handle Bar Painted Black, Fork Ex-900 Landing Gear Cp, Head Parts Nikyo/whw, H-post Bmx Ord.m, H-grip Ord. Opc Parts Neco Bearing Type, Opc Plate 36t, Chain Cp Bmx, Freewheel 24t, Pedal Opc Bearing Type, Seat Clamp/s-pin/ S-post P, Saddle With Spring, Footbreak With Spring "full Size" Frame, 175-180mm Cranks Side Car With Provision Of Umbrella And 2 Chest Coolers (52l Capacity) - Dimensions: 25.8" (l) X 16.2" (w) X 15.7" (h) Materials: 1/2 J1 Pipe 540, 316 X 1 Flat Square Bar, J1 Pipe De Una 520, 1/4 X 2 Flat Bar, 6203 Gi Set, Tire 20 X 2.125 Jumbo, Note: With Dole, Dilp Logo Fully Painted In A Galvanized Sheet Iron Attached On The Front Of The Sidecar With Approx. 15.7 Inches(h)x15.7 Inches(l) Fully Painted Color: Any Color 2 1 Unit Motorcycle Sidecar (for Fruits And Vegetable Vending): Metal Body, Dimensions L-4ft W-2ft H-2ft, With 17inch Side Wheel 3 11 Unit Negocart With Bicycle Roofing Materials: Bolt & Nut W/ Washer 3/16 X 1 Polycarbonate 6mm X 1.2 X 1.70 Welding Rod Body Materials:tubular 1 X 1 X 1.5;flat Bar 1/8 X 1;flat Bar 2' X 3/8 X 1;plain G.i.;sheet 4' X 8' #26;cylindrical Hinge 1/2" ᴓ;blind Rivets 1/8 X 1/2;cylindrical 1/2;cabinet Handle;cabinet Lock;round Bar 8mm ᴓ;transparents Barrier 1/4 X 4' X 8';welding Rod;stainless Sheet 4' X 8';plain Round Bar 16mm ᴓ: Bicycle Specs: Bmx Type Bike Frame, Front And Rear Free Wheel Hub For Rim Set Single Speed (wheel Set), Tire Size (20"x2.125 Jumbo), Interior Tube (20"x2.125), Bmx Handle Bar, Bmx Fork, Head Parts (h Post, Handle Grip), Chain (single Speed), Pedal (bearing Type), Seat Clamp, Saddle With Spring, Foot Brake (clamp W/ Spring), Crank Pedals (175mm-180mm Cranks) Note: With Dole, Dilp Logo And Tourism Spot At The Front And Side Of Cart, Logo Material: Weather Proof Sticker, Sizes Of Sticker: H-60cm X W-130cm (for Front Of Cart) And H-60cm X W:75cm (for Side Of Cart) Or H-23.6" X W-51" And H-23.6" X W-29.5" Fully Painted Color: Light Blue Lot 4 - Grooming Tools 1 1 Pc All Purpose Comb, 7inch, Plastic Material 2 3 Pc Barber Apron, With Two Pockets, Waterproof, Material: Fiber Size: Approximately 89x69cm - 35x27.2 Inches 3 1 Pc Barber Cape, 140cmx100cm Silk, Waterproof 4 1 Unit Barber Chair, Reclining, Modern Style, Chair Back Height: High-back; Upholstery: Faux Leather; Material: Stainless Steel; Dimension: 21"x22.5"x38" 5 1 Unit Clipper, Cordless, Includes 3 Metal Clip Attachment Comb Cutting Guides, 1/16", 1/8",3/16, 6.25 Inches And Weighs 13 Oz, Equipped With A 2191 Adjustable 0000 Blade 6 2 Unit Curling Iron, 38.5cm, Tourmaline Ceramic, 25-39w, 360 Degree Rotatable 7 2 Set Eyebrow Grooming Kit, 6pcs (2 Eyebrow Razor, 1 Facial Razor, 1 Brush, 1 Scissors, 1 Tweezer) 8 1 Pc Fade Brush, Material: Plastic & Nylon, (hxw) 12.3 X 2.3 Cm, Weight: 0.015 Kg 9 2 Unit Flat Iron, Ceramic Wide Plate, 100-240v Dual Votage, 40-59w, 27.8cm Long 10 2 Unit Hair Blower, 2 Speed - 3 Heat Settings, 2400w, Removable Filter Cover, Cool Shut Function, Dimension: 21.5x8.5x26.5cm 11 1 Set Hair Clips, Plastic, Size: Approximately 7.8cm 12 2 Set Hair Dying Tool Set, (5-pc) Small Brush - 19.5cmx4.5cm, Big Brush - 20.5x6cm, Secondary Comb - 19x5.5cm, Small Bowl - 13x4.5cm, 1 Pair Of Earmuffs 8x4.5cm 13 3 Pc Hair Shear, 6.9 Inch Stainless 14 10 Pc Hair Towel Turban, 49x18cm Microfiber 15 2 Set Make Up Brush Kit, 12 Pcs With Box 16 2 Set Make Up Kit, 35pcs (1 Eyeshadow, 1 Concealer, 4 Osmetic Brush, 3 Lipgloss, 1 Eyebrow Pencil, 1 Pressed Powder, 4 Lipstick, 4 Face Makeup, 1 Lip Balm, 1 12.5cmx19cm Makeup Bag, 1 Eyebrow Cream, 1 Primer, 1 Powder Puff, 1 Mascara) 17 2 Pc Makeup Kit Organizer, 50cmx39.5cmx21.5cm, Black,046 Glittery, Checkered 18 1 Pc Mirror, Double Sided Folding Mirror, (wxh) 24x 37cm, Weight: 0.532 Kg 19 1 Pc Neck Duster, Weight : 100g , Size : 18x7x7cm 20 1 Roll Neck Strips, (28cmx6.5cm) Self Adhesive, Material: Paper 21 4 Set Plastic Hair Roller, 25mm Assorted, 10-pc Large 22 3 Pc Pomade, 80g, Water-based 23 1 Pack Razor Blades, Durable, Stainless, 100 Pcs, (lxwxh) 14x10x1 24 1 Set Shaver, Abs Material,110-220v, Power: 3w, Size: 16.6x5.8cm, Battery Capacity: 600mah 25 2 Pc Shaving Gel, 195g With Aloe 26 2 Pc Talc Powder, 500g 27 1 Set Trimmer, Rechargable, 2 Blades, Power: 50-60 Hz, Voltage:100-240v, Dimension: 11.5x6.5x3cm 28 4 Pc Wide-tooth Comb, 16cm Plastic, Durable 29 1 Pc Wide-tooth Comb, Size: Approximately 21.5x5 Cm, Plastic Material Lot 5 - Sewing 1 7 Set Ball Point Pins, 250 Pcs Per Box With 8 Colors; Durable 2 8 Unit Bobbin Case, Diameter: 20.3mm Width: 11.7mm 3 8 Pc Bobbin, Diameter: 20.3mm Width: 11.7mm 4 4 Set Dressmaker's Shears, Material: Stainless Steel; Item Dimensions: Approximately 0.8" (l) X 3.9" (w) X 10" (h); Blade Length: 8"; Item Weight: Approximately 8.8 Ounces 5 1 Pc Edging/ Overlock Sewing Machine, Metal Material; Overlocker; 1 Stitch; Dimension(lxwxh) 12x13x14 6 3 Pc Electric High Speed Sewing Machine, Power: 90w; Rated Voltage: 220v; Gross Weight: About 7kg; Max Sewing Speed: 1,100 Stiches/min; Materials: Stainless Steel Needle Plate, Metal Frame; Dimensions: Approximately 44cm (l) X 16cm (w) X 28cm (h); Voltage: 220v, Secondary Lifting Height Or Presser Foot: 14mm; Needle Pitch: From 0-4.5mm, Needle Width: From 0-7.0mm 7 4 Pc Flat Iron, 1200w; Stainless Steel Sole Plate; Power Light Indicator; With Steaming/spray Function 8 4 Set French Curve, Dimension(21.65x0.39x7.09); 4.6 Ounce; Made Of Aluminum Or Plastic 9 4 Pc L-square, Material: Stainless; Item Weight: 0.32oz; Product Dimensions: Approx. 14" (l) X 24" (w) 10 1 Pc Manual Sewing Machine With Motor And Foot Controller, Metal Material, Heavy Duty, 9kg Weight, 1 Stitch Dimensions, (lxwxh) 12x13x14 11 4 Unit Meter Stick, Yellow Color; Wood Type 12 4 Pc Needle Threader, Metal Material; Oval Shape; 1 Inch Size 13 31 Pack Sewing Machine Needle, Flat Needles 10pcs/pack 14 11 Pc Sewing Threads 12pcs/box, Material: Cotton; Package Dimensions: Approx. 5.71" (l) X 3.74" (w) X 2.36" (h); Thread Size: Approx. 56mm (h) X 22mm (w); 550 Yards Each Roll 15 25 Pc Tailor’s Chalk, Square Shape; Orange Color;fades Or Brushes Away Easily 16 4 Pc Tape Measure, Material: Durable Soft Plastic; Color: Blue; Measurements: Inches (can Measure Upto 60") And Centimetres (can Measure Upto 150cm) Xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 2. Delivery Of The Goods Is Required Ninety (90) Calendar Days Delivery Period And Upon Receipt Of Notice To Proceed And Purchase. Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Interested Bidders May Obtain Further Information From Local Government Unit Of Mercedes, Camarines Norte-bac Secretariat And Inspect The Bidding Documents At The Address Given Below During Office Hours - 8:00 Am-12:00 To 1:00 Pm-5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 14, 2024 Until 8:30 Am Of January 6, 2025 From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos Only Php5,000.00. 6. The Local Government Unit Of Mercedes, Camarines Norte Will Hold A Pre-bid Conference On December 23, 2024 9:00am At Bids And Awards Committee Office- Second Floor Jpl Sports Complex - Municipal Compound, Eco Avenue Street, Barangay 5, Mercedes, Camarines Norte Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through (i) Manual Submission At The Office Address Indicated Below, On Or Before 8:30am January 6, 2025. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On 9:00 Am Of January 6, 2025 At The Bids And Awards Committee Office- Second Floor Jpl Sports Complex - Municipal Compound, Eco Avenue Street, Barangay 5, Mercedes, Camarines Norte. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 10. The Local Government Unit Of Mercedes, Camarines Norte, Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Macario B. Totanes Municipal Planning And Development Office Lgu Mercedes Municipal Compound, Barangay 5, Mercedes, Camarines Norte 0998-576-8321 Arsenia M. Ordiales Bac Secretariat Bids And Awards Committee Office 2nd Floor Jpl Sports Complex, Lgu Mercedes Municipal Compound, Barangay 5, Mercedes, Camarines Norte 0908-896-9684 Email Address: Lgubac.mercedes@yahoo.com 12. You May Visit The Website: For Downloading Of Bidding Documents: Www.mercedes.gov.ph December 13, 2024 ________________________________ Macario B. Totanes Bac Chairman
Closing Date6 Jan 2025
Tender AmountPHP 2.7 Million (USD 46.9 K)
Amt Ruhland Tender
Civil And Construction...+2Civil Works Others, Building Construction
Germany
Details: Building physics: thermal insulation and energy balance ISD Annex 1 (to Section 3 Paragraph 1), Section 1.2 Hoai For phased commissioning Basic information on the project The town of Ruhland, with around 3,800 residents, is a municipality in the Ruhland district and a basic functional focus for the around 7,200 residents of the Ruhland district. There are no buildings for unrestricted use for sports, clubs and the public in the town of Ruhland or in the wider district. The old gymnasium is currently in danger of collapsing and is therefore not usable. Due to the industrial complex bordering Ruhland to the north, Ruhland and other municipalities in the district are becoming increasingly attractive as places to live. This also increases the demand for a sports facility. The project is intended to significantly improve the living environment. The focus is on creating cross-generational leisure opportunities. The multi-purpose hall is intended to be a modern training and competition venue for the sports clubs in the Ruhland district. In addition, the project will significantly improve the conditions for school sports, which indirectly contributes to securing the school locations in the Ruhland district. This is also a location factor that should not be underestimated for the development of "residential quarters". At the same time, this hall will enable all residents of the community association to experience culture in the countryside across generations (e.g. concerts by choirs, marching bands, theater performances). Since the club landscape in the Ruhland district is already extremely diverse with around 100 active clubs, this building can also make a significant contribution to strengthening the club landscape and thus to strengthening volunteer work. The barrier-free use of the building is just as important as the resource-saving construction of a building that can make an important contribution to achieving climate protection goals both in construction and operation. The project is a hall with three hall sections. The dimensions of the hall area should be 22 MX 45 m, making the size of a handball court (20 MX 40 m) feasible. The size of the hall corresponds to the space recommendations for general education schools in the state of Brandenburg. Areas should be taken into account that correspond to the model area recommendations of the Brandenburg Ministry of Education, Youth and Sport. The hall should be usable as a competition, training and cultural event venue with spectator stands. With a view to the share of the costs for the operation and maintenance of the building, which are usually many times the investment, a key goal of the planning will be to build in a way that conserves resources and is therefore climate-friendly. The use of a heat pump using surface heating is one of many options. Support for the power supply and hot water preparation through solar gains is mandatory. A less structured building should therefore help to use the energy generated efficiently. A key planning task will have to be to adequately meet the usage requirements with a minimum of technical building equipment. The estimated total cost of the multi-purpose hall is approximately EUR 7,130,000 net. The estimated cost of the services for Kg 300 and 400 is approximately EUR 5,700,000 net. Services in detail Item Description Quantity Stage 1 Basic investigation (lph 1), preliminary design planning (lph 2) 1.1 Basic service Lph 1: Basic investigation A) Clarify the task; B) Establish the basics, specifications and objectives. Psch 1.2 Basic service Lph 2: Assist in preliminary planning A) Analysis of the basics; B) Clarify the key relationships between buildings and technical systems, including consideration of alternatives; C) Preliminary dimensioning of the relevant components of the building; D) Assist in coordinating the specialist planning concepts for the object planning and the specialist planning; E) Creating an overall concept in coordination with the property planning and specialist planning; F) Creating calculation models, listing the key parameters as a working basis for the property planning and specialist planning. Psch 1.3 Special service Lph 2: Energy concept in the preliminary planning A) Advice on funding options with regard to building energy efficiency; B) Creating an energetic building model based on the planning status of the preliminary planning (lph 2); C) Coordination with the property planning, TGA specialist planning and ELT specialist planning for the conditioning of the building zones; D) Energy balance according to DIN V 18599 taking into account the heating, hot water preparation, ventilation, cooling and lighting systems; E) Carrying out variant studies with regard to the energetic quality of the thermal building envelope and the energy supply of the building complex with heat energy and electricity; F) Assessing the variants in terms of cost-effectiveness (lcc) and ecology (lca) and presenting the performance (advantages and disadvantages); G) Explaining the results in a video conference or meeting in Ruhland; H) Selecting a preferred variant in coordination with those involved in the planning; I) Documentation in the form of a report. J) Creating up to 3 variants for the energy concept based on the preferred variant of the preliminary design planning. Psch Level 2 Design planning (lph 3), approval planning (lph 4) 2.1 Basic service Lph 3: Participating in the design planning A) Updating the calculation models and the key parameters for the project; B) Participating in updating the planning concepts for the object planning and specialist planning up to the complete design; C) Dimensioning the components of the building; D) Drawing up overview plans for component layers and the explanatory report with specifications, fundamentals and design data. Psch 2.2 Basic service Lph 4: Participating in the approval planning A) Participating in drawing up the approval planning and in preliminary discussions with authorities; B) Drawing up formal evidence of thermal building physics; C) Completing and adapting documents. Psch 2.3 Special service Lph 3: Energy concept in design planning A) Updating the energy concept in design planning taking into account the results of the thermal building simulation with regard to ventilation, heating and cooling of the building; B) Taking into account the planning status of the design planning. Psch 2.4 Special service Lph 3: 2D thermal bridge calculation A) Investigation of the minimum thermal insulation for a selected thermal bridge detail; B) Creation of a digital 2D model taking into account the component geometry and material parameters; C) Specification of the thermal boundary conditions in accordance with DIN 4108-2; D) Determination of the critical surface temperature and the critical FRSI value and comparison with the requirement values in accordance with DIN 4108-2; E) Development and coordination of necessary measures to ensure compliance with the proof of minimum thermal insulation in accordance with DIN 4108-2; F) Documentation of the results. 1 piece Ep per piece 2.5 Special service Lph 3: Proof of equivalence in accordance with DIN 4108 Bbl. 2 A) Proof of the equivalence of the thermal bridge details of the thermal building envelope of the building with the standard details in DIN 4108 Bbl. 2 (this means that a reduced thermal bridge surcharge of 0.05 W/(m²k) instead of 0.10 W/(m²k) can be taken into account in the GEG proof); B) Documentation in the form of a report. Psch 2.6 Special service Lph 3: Proof of moisture protection in accordance with DIN 4108-3 A) Examination of the moisture protection for all necessary external components of the building in accordance with GEG § 11 IVM DIN 4108-3; Comparison of the planned components with the verification-free designs specified in DIN 4108-3; coordination of possible measures to meet the moisture protection requirements; B) Advice on the need for alternative verification methods in accordance with item 2.7 or 2.8 if individual component verifications are not met; C) Preparation of verifiable verification of moisture protection for submission to the responsible authority provided that all component verifications are met. Psch 2.7 Special service Lph 3: Verification of moisture protection using the Glaser method A) Investigation of the moisture protection for a selected component construction in accordance with DIN 4108-3 Appendix A; B) Calculation of the amount of condensate using the simplified periodic balance method (Glaser method) and comparison with the calculated evaporation amount; C) Moisture-related assessment of the calculation results. 1 piece Ep per piece 2.8 Special service Lph 3: Proof of moisture protection using hygrothermal simulation A) Investigation of the moisture protection for a selected component construction in accordance with DIN 4108-3 Appendix D; B) Creation of a one-dimensional component model including the detailed layer structure of the component construction to be investigated; C) Implementation of the hygrothermal material properties; D) Consideration of moisture entry as a result of driving rain and/or infiltration; E) Illustration of the orientation of the component and definition of the surface transfer coefficients; F) Determination of the initial temperature and initial moisture for each component layer; G) Selection of suitable data sets for the outside and inside climate; H) Simulation of the transient hygrothermal component behavior under real climatic conditions over a period of several years; I) Moisture-related evaluation of the simulation results. 1 piece Ep per piece Level 3 Execution planning (lph 5) 3.1 Checking the execution planning of the object planning (lph 5) A) Working through the results of service phases 3 and 4, taking into account the specialist planning integrated into the object planning, B) Contributing to the execution planning by providing additional information for the object planning and specialist planning Psch 3.2 Special service Lph 5: Checking all essential details of the building envelope for compliance with the planned constructions with regard to thermal bridges. Psch Level 4 Construction execution/documentation (lph 8) 4.1.1 Site inspections (lph 8) A) On-site construction site inspection to check thermal insulation issues, drawing up a report including photo documentation; B) Handing over the report and the original photos with date and time to the client. 1 H Ep Each H 4.1.2 Site inspections (lph 8) A) Arrival and departure, including all travel costs 1 pc Ep Each pc 4.2 Preparation of the energy certificate (lph 8) A) Handover of a requirements matrix to the documentation, preparation of the energy certificate according to the built object after completion. Psch Level 5 Accompaniment of building certification 5.1 Thermal building simulation in the design planning (lph 3) to check and optimize the thermal comfort A) Creation of a detailed 3D building model of the building complex based on the planning status of the preliminary planning, including consideration of the geographical location, the building's own shading and the shading from any existing neighboring buildings; B) Zoning of the building according to the planned use; C) Implementation of the physical component properties from the preliminary planning or the energy concept (u-value, thermal storage mass, G-value of the glazing, radiation values of the sun protection, etc.); Coordination of the internal heat loads from people, lighting and devices with those involved in the planning; Consideration of the planned systems for heating, cooling and ventilation from the preliminary planning or the energy concept; D) Selection of max. 5 reference rooms for the detailed evaluation of the results in coordination with the client; E) Carrying out the building simulation with the local test climate data from the German Weather Service; F) Assessment of the summer thermal comfort in the reference rooms according to DIN EN 15251; G) Variant study (max. 5 variants) for dimensioning or optimizing the transparent components, the sun protection systems and the ventilation and cooling systems with regard to thermal comfort in summer; H) Explanation of the results in a video conference or meeting in Ruhland; I) Selection of a preferred variant together with those involved in the planning and the client. Psch 5.2 Thermal building simulation in the draft planning (lph 3) to check the requirements according to DIN 4108-2 and ASR A3.5 A) Checking the preferred variant from item 5.1 with regard to compliance with the requirements of ASR A3.5 and the building law requirements for summer thermal insulation according to Geg § 14 IVM DIN 4108-2 B) Documentation in a report. Psch 5.3 Thermal building simulation in the approval planning (lph 4) A) Updating the thermal building simulation in the approval planning taking into account the results of the draft planning; B) Taking into account the planning status of the approval planning, creating verifiable proof of summer thermal insulation for submission to the responsible authority. Psch 5.4 Participation in audits in certification processes (lph 3) A) Calculation of alternative building conditioning in the Lph 3 according to DIN 18599, specification of the calculation results per energy source final energy (same object geometry). 1 piece Ep per piece 5.5 Daylight simulation A) Calculations and evidence for the profile visual comfort according to Bnb daylight availability entire building B) Daylight simulation, from which the daylight quotients arise, C) Or alternatively: extracts from the public law evidence according to valid Geg, from which the daylight quotients arise. D) Documentation of the calculated daylight quotients of the usable rooms of the entire building with area information and labeling of the areas whose Df (daylight factor) is > 1; 1.5 or 2%. E) Availability of daylight for permanent workplaces F) Extracts from the calculation of the relative, annual useful lighting for the G) standard usage times according to DIN V 18599-4 H) Documentation of the calculated relative, annual useful lighting of the individual workplaces Psch
Closing Date16 Jan 2025
Tender AmountRefer Documents
3491-3500 of 3496 archived Tenders