Shoes Tenders
Shoes Tenders
City Government Of Isabela Tender
Furnitures and Fixtures
Philippines
Details: Description 1. The City Government Of Isabela, Basilan, Intends To Apply The Sum Of Four Million Two Hundred Thirty-three Thousand Nine Hundred Seventy-eight Pesos Only (₱4,233,978.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Procurement Of Furniture For The New City Hall Building. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The City Government Of Isabela, Basilan Now Invites Bids For Procurement Of Furniture For The New City Hall Building To Wit: Stock Quantity Unit Of Item Description 1 17 Pcs Executive Table 2 17 Pcs Executive Chair Employee Tables: 3 7 Pcs A. 6-person Workstation 4 2 Pcs B. 4-person Workstation 5 110 Pcs C. Single Workstation 6 160 Pcs Employee Chair 7 2 Pcs Conference Table 8-seater 8 16 Pcs Conference Chairs 9 25 Pcs Visitors Chairs 10 28 Pcs Printer Tables 11 7 Pcs 3-seater Gang Chairs 13 2 Rolls Carpet (40 Sqm/roll) Filing Cabinets For Fabrication 14 1 Pcs Shoe Cabinet Partition (2.60m X 0.40m X 2.40m) 15 17 Pcs Cabinet-1 (3.60m X 0.45m X 0.90m) 16 1 Pcs Cabinet-2 (4.60m X 0.45m X 0.90m) 17 2 Pcs Cabinet-3 (1.40m X 0.45m X 0.90m) 18 1 Pcs Cabinet-4 (2.40m X 0.90m X 2.40m) 19 2 Pcs Cabinet-5 (1.60m X 0.90m X 2.40m) 20 2 Pcs Cabinet-6 (3.60m X 0.45m X 2.40m) 21 8 Pcs Cabinet-7 (2.40m X 0.45m X 2.40m) 22 5 Pcs Cabinet-8 (3.00m X 0.45m X 2.40m) 23 1 Pcs Cabinet-9 (2.00m X 0.45m X 2.40m) 24 2 Pcs Cabinet-10 (1.80m/4.80m X 0.45m X 2.40m) 25 1 Pcs Cabinet-11 (4.00m/3.45m X 0.45m X 2.40m) 26 3 Pcs Cabinet-12 (3.00m X 0.45m X 0.90m) The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. 4. Interested Bidders May Obtain Further Information From Bids And Awards Committee City Of Isabela, Basilan And Inspect The Bidding Documents At The Address Given Below During 9:00 Am To 5:00 Pm, Monday To Friday. 5. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders Starting On January 3, 2025 From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Php 5,000.00. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) Provided That Bidders Shall Pay The Nonrefundable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. Bids Must Be Delivered To The Address Below On Or Before January 24, 2025 At 9:30 A.m., Sakayan Conference Room, Mayor’s Office, City Hall Complex, Sunrise Barangay, Isabela City, Basilan. All Bids Must Be Accompanied By A Bid Security In Cash, Certified Checks Or Bank Guarantee. Bid Opening Shall Be On January 24, 2025 At 9:30 A.m Sakayan Conference Room, Mayor’s Office, City Hall Complex, Sunrise Barangay, Isabela City, Basilan. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 7. The Bac Isabela City, Basilan Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 8. For Further Information, Please Refer To: Roberto E. Arsena Ii Bac Secretariat Head Bac Office, 2nd Floor Main Building, City Hall Sunrise, Isabela City, Basilan Cp No. 09958110219 Vido F. Yu Bac Chairman Pre-bid Conference
Closing Date24 Jan 2025
Tender AmountPHP 4.2 Million (USD 72.2 K)
Balicuatro College Of Arts And Trades Tender
Textile, Apparel and Footwear
Philippines
Details: Description Tesda Viii-tti-op-06-f02 Rev. No. 00 – 03/18/2024 Request For Quotation Date: 01 – 06 – 2025 Rfq No. : 2025-01-0008 Pr No : 2025-01-0008 Name Of Business/ Company : Address : Tax Identification No.: Philgeps Registration No.: The Balicuatro College Of Arts And Trades, Through Its Procurement Unit, Intends To Procure Materials To Conduct Training In Housekeeping Nc Ii Twsp (biri, Nothern Samar), Which Will Be Undertaken In Accordance With Section 53.9 (small Value Procurement) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184. Please Quote Your Best Offer For The Item/s Described Herein Subject To The Terms And Conditions Provided In The Last Page Of This Rfq. Submit Your Quotation Duly Signed By You Or Your Duly Authorized Representative Not Later Than January 17,2025 At 2:00 P.m. Through Email At Tesdabcatsupply17@gmail.com. Interested Suppliers Are Required To Submit Copies Of The Following As Per Annex “h” Of The 2016 Revised Irr Of Republic Act No. 9184 Along With Your Quotation/proposal: A) Philgeps Registration Number B) Mayor’s/business Permit C) Income/business Tax Return (for Abc Above P500k) D) Omnibus Sworn Statement (for Abc Above P50k) Open Quotations May Be Submitted Manually At The Tesda-bcat Campus, Magallanes St., Sabang Ii, Allen, Northern Samar Or Email At Tesdabcatsupply17@gmail.com In Pdf Format. For Further Queries, You May Contact Us At Telephone No. 09275821039 Or Email Address At Bcat2016@tesda.gov.ph Daryl P. Lim Administrative Officer Iv Head, Finance And Administrative Unit Tesda Viii-tti-op-06-f03 Rev. No. 00 – 03/18/2024 Price Quotation Form Date: __________________ Balicuatro College Of Arts And Trades Magallanes St. Sabang Zone Ii Allen Northern Samar Tesdabcatsupply17@gmail.com Sir/madam: After Having Carefully Read And Accepted The Terms And Conditions, I/we Submit Our Quotation/s For The Item/s As Follows: No. Item/technical Specifications Qty. Unit Approved Budget For The Contract (in Peso) Offer Compliance With The Technical Specifications (please Check) Price Offer Remarks Yes No 1 Cleaning Detergent 20 Liters 380.00 [ ] [ ] 2 Liquid Detergent 20 Liters 380.00 [ ] [ ] 3 Toilet Disinfectant 20 Liters 380.00 [ ] [ ] 4 Toilet Bowl Swabs 5 Pieces 300.00 [ ] [ ] 5 Air Freshener 10 Bottles 280.00 [ ] [ ] 6 Toilet Paper 20 Roll 50.00 [ ] [ ] 7 Microfiber Cloth 10 Pieces 50.00 [ ] [ ] 8 Disinfectant 20 Liters 380.00 [ ] [ ] 9 Drain Solvents 10 Bottles 200.00 [ ] [ ] 10 Garbage Bags 10 Rolls 250.00 [ ] [ ] 11 All Purpose Detergents 20 Liters 380.00 [ ] [ ] 12 Pesticides 20 Bottles 300.00 [ ] [ ] 13 Deodorizers 20 Pieces 200.00 [ ] [ ] 14 Rug 10 Pieces 50.00 [ ] [ ] 15 Shoe Polish Set 20 Set 200.00 [ ] [ ] 16 Dishwashing Liquid 20 Bottles 200.00 [ ] [ ] 17 Alcohol 20 Pieces 200.00 [ ] [ ] 18 Baking Soda 20 Packs 50.00 [ ] [ ] 19 Vinegar 20 Bottles 150.00 [ ] [ ] 20 Toilet Bowl Cleaner 20 Bottles 200.00 [ ] [ ] 21 Tile Cleaner 20 Bottles 200.00 [ ] [ ] 22 Glass Cleaner 20 Bottles 200.00 [ ] [ ] 23 Powder Detergent 20 Packs 300.00 [ ] [ ] 24 Color Safe Bleach 20 Bottles 380.00 [ ] [ ] 25 Fabric Conditioner 20 Bottles 300.00 [ ] [ ] 26 Spray Bottles 10 Pieces 150.00 [ ] [ ] Pqf Page 1 Terms And Conditions 1. Bidders Shall Provide Correct And Accurate Information Required In This Form. 2. Bidders May Quote For Any Or All Of The Items. 3. Price Quotation/s Must Be Valid For A Period Of Thirty (30) Calendar Days From The Date Of Submission. 4. Price Quotation/s, To Be Denominated By Philippine Peso Shall Include All Taxes, Duties, And Or Levies Payable. 5. Quotations Exceeding The Approved Budget For The Contract Shall Be Rejected. 6. Award Of Contract Shall Be Made To The Lowest Quotation Which Complies With The Technical Specifications, And Other Terms And Conditions Stated Herein. 7. Any Interlineations, Erasures Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By You Or Any Of Your Duly Authorized Representative/s. 8. The Item/s Shall Be Delivered According To The Requirements In The Technical Specifications. 9. Tesda Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Technical Specifications. 10. Liquidated Damages Equivalent To One Tenth Of One Percent (0.001) Of The Value Of The Goods Not Delivered Within The Prescribed Delivery Period Shall Be Imposed Per Day Of Delay. Tesda Shall Rescind The Contract Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. Name Of Business/company Signature Over Printed Name Office Telephone/fax No. Mobile No. Email Address Pqf Page 2
Closing Date20 Jan 2025
Tender AmountPHP 107.9 K (USD 1.8 K)
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Healthcare and Medicine
United States
Details: This Is Not A Solicitation. This Is A Sources Sought Notice Only And Is Issued To Conduct Market Research And Gain Knowledge Of Current Market Capabilities. Responses To This Notice Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract. This Notice Is Issued Solely For Information And Planning Purposes And Does Not Constitute A Solicitation Or A Guarantee To Issue A Solicitation In The Future. This Notice Does Not Commit The Government To Contract For Any Supply Or Service. All Information Submitted In Response To This Announcement Is Voluntary; The Government Will Not Pay For Information Requested Nor Will It Compensate Any Respondent For Any Cost Incurred In Developing Information Provided To The Government. Not Responding To This Notice Does Not Preclude Participation In Any Future Solicitation, If Issued. This Announcement Is Based On The Best Information Available At This Time And Is Subject To Future Amendment.
the Department Of Veterans Affairs, Network Contracting Office 4, Is Conducting A Market Survey To Identify Potential Sources To Perform A Firm Fixed Price Contract For Procurement Of Scrub Dispensing Machines For The Lebanon Va Medical Center, 1700 S. Lincoln Ave., Lebanon, Pa 17042:
draft Requirements Description (not Comprehensive)
the Lebanon Va Medical Center Is Seeking To Procure A Contract For Scrub Dispensing Machines To Cover A Five-year Period.
description
the Lebanon Veterans Affairs Medical Center (lvamc), Located At 1400 S. Lincoln Avenue, Lebanon, Pa 17042, Has A Requirement For A Firm Fixed Price Five-year Idiq Requirements Contract For Automated Scrub Dispensing Machines.
the Contractor Shall Provide All Resources Necessary To Install And Maintain Four Automated Scrub Dispensing Machines, Eight Automated Return Units, And All Scrub Rentals To Include A Loss/replacement Program, Laundering, And Restocking Of The Dispensers. The Automated Dispensing Machines And Automated Return Units Shall Be Located Throughout The Lvamc.
the Contractor Shall Provide All Labor, Equipment, Tools, Materials, Supervision, And Technical Expertise Necessary To Maintain A Properly Managed Automated Dispensing And Scrub Rental Program.
place Of Performance:
department Of Veterans Affairs
lebanon Va Medical Center
1700 South Lincoln Ave
lebanon, Pa 17042
anticipated Period Of Performance:
year 1 - 05/10/2025 Through 05/09/2026
year 2 - 05/10/2026 Through 05/09/2027
year 3 - 05/10/2027 Through 05/09/2028
year 4 - 05/10/2028 Through 05/09/2029
year 5 - 05/10/2029 Through 05/09/2030
scope Of Work:
contractor Shall Provide The Lebanon Va Medical Center With Surgical Scrub Services. All Personnel, Equipment, Tools, Materials, Supervision Shall Be Provided By The Contractor. Contractor Shall Provide, Install, And Maintain Four Automated Scrub Dispensing Machines, Eight Automated Return Units, Along With All Scrub Rentals To Include An Auto-loss Replacement Program, Laundering And Restocking The Dispensers. The Contractor Shall Furnish Everything Needed To Perform This Contract According To All Its Terms.
all Automated Dispensing And Return Units Shall Adhere To The Provided Size Restraints Annotated Herein, And All Scrubs Shall Be Laundered, Folded And Tracked In Accordance With This Statement Of Work.
performance Requirements
the Contractor Shall Provide, Install, And Maintain To Ensure Proper Operations Of:
4 Automated Scrub Dispensers:
dispenser #1 Shall Fit Into The Dimensions Of 93 H X 158 W X 34 D
dispenser #2 Shall Fit Into The Dimensions Of 108 H X 158 W X 34 D
dispenser #3 Shall Fit Into The Dimensions Of 100 H X 79 W X 30 D
dispenser #4 Shall Fit Into The Dimensions Of 123 H X 112 W X 108 D
8 Automated Scrub Return Units:
return Unit #1 Shall Fit Into The Dimensions Of 94 H X 106 W X 30 D
return Unit #2 Shall Fit Into The Dimensions Of 96 H X 95.5 W X 29 D
return Unit #3 Shall Fit Into The Dimensions Of 109 H X 37 W X 24 D
return Unit #4 Shall Fit Into The Dimensions Of 108 H X 60 W X 33 D
return Unit #5 Shall Fit Into The Dimensions Of 100 H X 40 W X 25 D
return Unit #6 Shall Fit Into The Dimensions Of 100 H X 40 W X 25 D
return Unit #7 Shall Fit Into The Dimensions Of 123 H X 112 W X 108 D
return Unit #8 Shall Fit Into The Dimensions Of 123 H X 112 W X 108 D
the Contractor Shall Provide, Stock, Collect, Transport, Hygienically Launder, Fold, Individually Package In Poly Wrap, And Maintain Stock Of Contractor-owned Scrubs Of Various Sizes With Estimated:
minimum Annual Order Of 300,000 Scrubs
maximum Annual Order Of 800,000 Scrubs
the Contractor Shall Have The Ability To Track Weekly Use Of Garments Via An Electronic Monitoring System And Provide A Report Of Items Serviced Upon Request. The Contractor Shall Provide A Rental Program For Scrub Pants, Shirts And Jackets And Provide The Lvamc With An Auto-loss Replacement Policy To Replace Any Scrubs That May Become Damaged Or Deemed No Longer Usable.
detailed Performance Requirements
automated Scrub Dispensers
contractor Shall Deliver All Automated Scrub Dispensers To Proper Locations, Install, Program, Stock And Insure Proper Operations Of Every System.
the Dispensing Machine Units Shall Be Provided By The Contractor On A Rental Basis For As Long As The Contract Is In Place. The Machines Shall Be Installed, Serviced, And Maintained By The Contractor As Well As Be Fully Functional. If A Machine Has Any Technical Difficulties And/or Malfunctions, The Contractor Shall Make Every Effort To Properly Resolve The Issue By Coming On Site As Needed, As Well As Maintaining Open Communication With The Program Point Of Contact (poc) During This Process. The Contractor May Leave A Key To The Dispensing Machines With The Poc In Case Of A Malfunction, Requiring Them To Be Opened For Simple Fixes.
contractor Shall Gather Usage Data Through Input Collected At Each Station. The Collected Data Will Not Require Any Medical Staff Phi/pii Information. Contractor Shall Have No Need To Connect To The Lvamc Network. At No Time Will Patient Or Employee Information Be Shared With The Contractor.
contractor Shall Train All Necessary Staff On How To Properly Use The Dispenser/return Units.
dispenser Locations:
Dispenser #1 Shall Be Housed Within Building 1 Sterile Processing Service Department
Dispenser #2 Shall Be Housed Within Building 101 Operating Room
Dispenser #3 Shall Be Housed Within Building 17, 5th Floor, Dental
Dispenser #4 Shall Be Housed Within Building 101, Room 140
automated Scrub Returns
contractor Shall Deliver All Automated Scrub Returns To Proper Locations, Install, Program, Stock And Insure Proper Operations Of Every System.
the Return Machine Units Shall Be Provided By The Contractor On A Rental Basis For As Long As The
contract Is In Place. The Machines Shall Be Installed, Serviced, And Maintained By The Contractor As Well As Be Fully Functional. If A Machine Has Any Technical Difficulties And/or Malfunctions, The Contractor Shall Make Every Effort To Properly Resolve The Issue By Coming On Site As Needed, As Well As Maintaining Open Communication With The Poc During This Process. The Contractor May Leave A Key To The Return Machines With The Poc In Case Of A Malfunction And The Machine Would Need To Be Opened For Simple Fixes.
contractor Shall Gather Usage Data Thru Input Collected At Each Station. The Collected Data Will Not Require Any Medical Staff Phi/pii Information. Contractor Shall Have No Need To Connect To The Lvamc Network. At No Time Will Patient Or Employee Information Be Shared With The Contractor.
contractor Shall Train All Necessary Staff On How To Properly Use The Return Units.
return Locations:
Return Unit #1 And #2 Shall Be Housed Within Building 1 Sterile Processing Service
Department
Return Unit #3 Shall Be Housed Within Building 101 Operating Room Locker Room #1
Return Unit #4 Shall Be Housed Within Building 101 Operating Room Locker Room #2
Return Unit #5 Shall Be Housed Within Building 17, 5th Floor, Dental Lab
Return Unit #6 Shall Be Housed Within Building 17, 5th Floor, Dental Lab
Return Unit #7 Shall Be Housed Within Building 101, Room 140
Return Unit #8 Shall Be Housed Within Building 101, Room 140
scrubs
the Contractor Shall Be Capable Of Providing Hygienically Clean Scrubs Individually Folded And In Individually Poly-wrapped Packages. The Contractor Shall Have A Management System That Uses Barcoded Garments To Determine Lifecycle Of The Garments For Replacement And Be Capable Of Delivering Disinfected, Sterilized, And Cleaned Scrubs Within 24 Hours To The Facility.
contractor Shall Barcode Each Item To Maintain Precise Management Of Rental Garments In Accordance With Contractor S Regular Business Practices. Contractor Shall Sort And Stock/restock Clean Scrubs Into Dispensing Machines In Designated Areas Of The Medical Center. Contractor Shall Empty Out Soiled Items From The Return Units Located In Designated Areas Of The Medical Center. Contractor Shall Launder Scrubs To Infection Control Standards As Well As The Removal Of Foreign Material (e.g., Soil, And Organic Material) From Scrub Supply Using High-level Disinfection And Sterilization Process. Contractor Shall Also Provide Cleaned Scrubs With No Stained, Marked, Tinted, Or Any Other Foreign Material That Did Not Come With The Original Fabric Of The Surgical Scrubs. All Scrubs Shall Be Cleaned Within Hohenstein And Cdc Approved Standards.
each Item Shall Be Individually Folded And Individually Poly-wrapped Prior To Delivery. Each Item Shall Be Loaded Individually As To Allow For Mix Matching Of Sizes To Be Dispersed As Needed.
contractor Shall Track The Weekly Use Of Garments And Provide A Report Of What Items Have Been Serviced To The Poc Upon Request.
contractor Shall Have The Ability To Custom Tailor Garments To Fit Staffing Sizing Needs And
requirements. Each Dispenser Is To Stock Complete Sizes Of Scrub Sets, I.e. Extra Small, Small, Medium, Large, Extra-large, 2 Extra-large, 3 Extra-large, 4 Extra-large Etc. Request For More Or Less Of Certain Sizes Due To Employee Needs And/or New Sizes Of Scrubs, Due To Change Of Employees, Shall Be Communicated On A Written Request Through The Poc. Contractor Shall Fill The Dispensers To Their Full Capacity On Each Visit. Sizes For Each Dispenser Shall Be Adjusted Based On The Average Weekly Demand History After The Contract Is Awarded. The Contractor Shall Establish, Track, And Modify Distribution Based On Demand History.
the Contractor Shall Provide All Personnel, Rental Equipment, Tools, Materials, Supervision, Other Items And Services Necessary To Manage The Required Garments For Pick-up Three Times Per Week (mondays, Wednesdays And Fridays), Cleaning, Drop-off Three Times Per Week (mondays, Wednesdays And Fridays) And Restocking Of Cotton/polyester Blend Scrub Uniforms/scrub Jackets For The Lebanon Va Medical Center As Defined In This Statement Of Work.
the Following Scrub Colors Shall Be Available And Decided Upon Award Of Contract:
ceil Blue
royal Blue
navy
steel Grey
teal
black
forecasted Demand Per Dispenser By Size:
regular Sizes
4-xl-5%
3-xl-5%
2-xl 10%
xl-25%
large 25%
medium 10%
small-5%
extra Small-5%
hours Of Operation
the Contractor Shall Perform The Tasks As Required By The Sow Under This Contract During The Following Hours: Monday, Wednesday, And Friday Between 6:00am, Et, And 2:30pm, Et, Unless Other Time Is Specified.
holidays: Delivery Of Scrubs Shall Not Occur On Federal Holidays. Should A Delivery Be Regularly Scheduled On A Holiday, The Delivery Shall Occur On The Workday Prior To The Holiday. The Observed Federal Government Holidays Are: New Year S Day, Martin Luther King Jr. Day, Presidents Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day,
veterans Day, Thanksgiving Day, And Christmas Day. When Such Holiday Falls On First Non-workday, The Preceding Workday Shall Be Considered A Holiday. When Such Holiday Falls On The Second Non-workday, The Next Workday Shall Be Considered A Holiday.
a Special Event Or Adjusted Work Hours: If Circumstances Should Arise Wherein The Contractor Desires A Different Work Schedule As Required, The Contractor Shall Request This In Writing. Submit A Written Request To The Government Poc A Minimum Of 72 Hours Before The Requested Adjusted Work Schedule, To Include Inclement Weather.
general Information
quality Control
the Contractor Shall Monitor Its Employees' Performance And Based Upon The Results Of Such
monitoring, Shall Establish Performance Improvement Activities To Assure Employee Efficiency And Knowledge Meets Standards. Contractor Shall Ensure Employees Are Performing Their Duties In A Manner Consistent With All Federal, State, And Local Rules And Regulations As Set Forth By Applicable Regulatory Agencies And This Contractual Agreement.
quality Assurance
if The Government Performs Inspections Or Tests On The Premises Of The Contractor, The
contractor Shall Furnish, Without Additional Charge, All Reasonable Facilities And Assistance For
the Safe And Convenient Performance Of These Duties.
infection Control
all Laundering Employees, Including Truck Drivers, Shall Be Educated As Well As Practice Proper
hand-washing Techniques And Shall Also Participate In Educational Programs To Learn About Blood Borne-pathogen Management And The Use Of Personal Protective Equipment (ppe). Care Shall Be Taken To Contain Pathogens During Transport (separation Of Clean From Soiled), Efforts To Avoid Cross Contamination Between Soiled And Clean Items And Use Of A Consistent Thorough Wash Process. A Quality Assurance Program Shall Be Used To Ensure Life Of Textile Is Not Exceeded Per Manufacture Recommendations. Transportation Of Any Scrubs Shall Be Covered With Heavy Plastic Prior To Leaving The Plant To Avoid Any Pathogen Contamination And Handled In Accordance With Industry Best Practice To Ensure That They Remain Hygienically Clean. This Includes The Use Of A Truck Dedicated To Healthcare Transport And Proper Use Of Personal Protective Equipment (ppe).
inspections
the Government, At All Reasonable Times, Shall Have Access And Permission To Inspect The Delivery Truck And Carts.
contractor Staff Information
the Contractor Shall Provide A Contract Manager Who Shall Be Responsible For The Performance Of The Work. The Name Of This Person, And An Alternate Or Alternates, Who Shall Act For The Contractor When The Manager Is Absent, Shall Be Designated In Writing To The Contracting Officer. The Contract Manager Or Alternate Shall Have Full Authority To Act For The Contractor On All Contract Matters Relating To Daily Operation Of This Contract. The Contract Manager And Alternate Or Alternates Shall Be Able To Read, Write, Speak, And Understand The English Language.
uniforms
all Employees Shall Wear Contractor Provided Uniforms (contractor Code Of Dress), Which Include Pants, Shirts Or Blouses, And Protective Clothing Which Are Clearly Distinguishable From Other Lvamc Uniforms Currently In Use. The Uniform Shall Be Worn As Designed By The Manufacturer. Open Toe Shoes Or Sandals Shall Not Be Worn. A Basic Leather Shoe Covering The Entire Foot Is Recommended. All Personnel Shall Display Identification Badges On Their Uniforms, Which Will Show The Employee S Last Name And The Contractor S Full Name.
personal Hygiene
contractor S Personnel Shall Be Clean, Bathe Daily (including Hair), And Wear A Clean Uniform Daily. Fingernails Shall Be Clean And Free Of Dirt. Hair Shall Be Neatly Trimmed And Combed.
security Requirements
the Contractor S Employees Shall Wear Visible Identification At All Times While On The Premises. It Is The Responsibility Of The Contractor To Park In The Appropriate Designated Parking Areas. The Department Of Veterans Affairs Shall Not Invalidate Or Make Reimbursement For Parking Violations Of The Contractor Under Any Conditions. Smoking Is Prohibited On Va Grounds. Possession Of Weapons Is Prohibited. Violations Of Va Regulations May Result In Citation Answerable In The United States (federal) District Court, Not A Local District, State, Or Municipal Court. All Contractor Employees Performing Tasks Related To This Sow, While On Lvamc Property, Shall Have Proper Valid Identification. All Applicable Background Checks Shall Be Completed Before Contractor Employees May Begin Work. Badges After Security Clearances Shall Be Worn At All Times While On Va Grounds.
damage
extreme Caution Shall Be Exercised To Prevent Damage To The Building And Its Contents. Any Damage Shall Be Reported To The Poc Immediately For Appropriate Action. Any Damage Caused By The Contractor Shall Be Repaired And Or Replaced To The Satisfaction Of The Va At The Contractor S Expense. Damage To The Building, Its Contents Or Loss Of Government Property In Excess Of $100,000 Shall Require A Report Of Survey Or Investigation Report By The Vacc. Appropriate Government Personnel Shall Conduct The Investigation. The Responsible Party Shall Be Required To Replace And/or Submit Payment For Damage Or Loss.
access (keys)
if The Poc Provides Keys For Access, It Shall Be The Contractors Responsibility To Safeguard And Control Keys Provided.
capabilities Statement And Documentation:
companies Are Invited To Provide Their Capabilities, Experience, And Knowledge In The Provision Of Scrub Dispensing Machines. Sources Are Asked To Provide Information To Demonstrate Their Answers To The Following Items Of Information:
1. General Information About Your Company To Include:
company Name:
company Address:
socioeconomic Status:
gsa Contract Number Covering These Services And Expiration Date (if Applicable):
company Unique Equity Identifier (uei):
company Naics Code(s):
point Of Contact Name:
point Of Contact Phone Number:
point Of Contact Email Address:
company Website (if Available):
2. The North American Industry Classification System Code (naics) Is 812332 (industrial Launderers), And The Small Business Size Standard Is $47 Million.
3. Based On Market Response, The Following Clauses May Be Included In A Resulting Solicitation, Should One Be Issued:
vaar 852.219-10, Va Notice Of Total Service-disabled Veteran-owned Small Business Set-aside.
vaar 852.219-11, Va Notice Of Total Veteran-owned Small Business Set-aside.
far 52.219-6, Notice Of Total Small Business Set-aside.
accordingly, Prospective Contractors Will Be Required At Time Of Solicitation Response To Certify To The Applicable Limitation On Subcontracting Requirements In 13 Cfr 125.6, With Reference To The Appropriate Set-aside. Please Include In The Response To This Sources Sought Notice Your Ability Or Inability To Certify To The Clause Applicable To Your Organization.
4. Provide A Summary Of Your Firm S Ability To Provide The Services Described In This Announcement. In Addition To A Capability Statement, Submissions Can Include Specifications, Brochures, And Manuals As Attachments.
submit Responses Via Email Only To Contracting Officer Stephanie Mcfadden At Stephanie.mcfadden@va.gov, No Later Than 1:00 Pm Est, Tuesday, January 14, 2025, With Sources Sought Number 36c24425q0186 In The Subject Line. Telephone Responses And/or Questions Shall Not Be Accepted. The Government Will Not Provide Feedback In Response To Vendor Questions About The Requirement At This Time. If You Identify Ambiguities Or Have Concerns About Anything In The Description Of The Requirement, However, Please Include Them With Your Response. Confirming Receipt Of The Response Is The Responsibility Of The Contractor. Contact The Contract Specialist If The Government Does Not Confirm Receipt Of The Sources Sought Response Within 2 Business Days.
simply Responding As An Interested Party Does Not Constitute Your Company As A Source. Prospective Contractors Must Provide The Above Requested Information. After Review Of The Responses To This Sources Sought Notice, A Solicitation Announcement May Be Published On The Sam, Nasa Sewp V Or Gsa Websites In The Near Future. Responses To This Sources Sought Notice Are Not Considered Adequate Responses To A Solicitation Announcement. All Prospective Contractors Are Required To Respond To A Solicitation Announcement In Addition To Responding To This Sources Sought Notice.
prospective Contractors Are Reminded That In Accordance With Far 4.11 They Shall Be Registered In The System For Award Management (sam) Database And Shall Complete Electronic Annual Representations And Certifications In Sam Prior To Award Of A Contract. Sam Is Located At Https://sam.gov/sam/ And Consolidated The Capabilities Of Ccr/fedreg, Orca, And Epls. There Is No Cost To Use Sam.
no Solicitation Document Is Available At This Time; This Notice Is To Acquire Information Only.
Closing Date14 Jan 2025
Tender AmountRefer Documents
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Others
United States
Details: This Is A Sources Sought Notice Only.
this Is Not A Solicitation For Bids, Proposals, Proposal Abstracts, Or Quotations. The Purpose Of This Sources Sought Notice Is To Obtain Information Regarding The Availability And Capability Of Qualified Sources To Perform The Potential Requirement. This Sources Sought Notice Is Part Of Market Research Effort And Invites Contractors Capable Of Fulfilling The Requirement In Accordance With The Statement Of Work And Salient Characteristics.â The Responses Received From Interested Contractors Will Assist The Government In Determining The Appropriate Acquisition Method.
the Department Of Veterans Affairs (va), Network Contracting Office (nco) 23, Is Conducting Market Research To Identify Potential Sources Which Can Provide The Following:â
statement Of Work
mold Remediation Services
introduction/background
air Quality Testing In A Va Building, Revealed Levels Of Airborne Microbial Particles That Exceed An Acceptable Level For A Healthcare Facility. Due To This Hazard, The Building Has Been Vacated Of All Patients And Staff And Will Remain So Until It Is Safe To Occupy.
project Objective
remediation Services To Remove Or Clean All Surfaces And Materials Located Inside Building.
Building To Be Placed Under Negative Pressure, With Additional Units To Be Used As Air Filtrations. Hvac System To Be Isolated, All Diffusers Removed, Cleaned, Then Set Aside, All Flex Ducting To Be Removed (to Later Be Replaced), And All Duct Openings To Be Sealed. All Carpet In The Building To Be Removed. All Ceiling Tiles In The Building To Be Removed. All Drywall (including Above The Drop Ceiling) That Has Microbial Growth Or Moisture Damage To Be Removed. All Pipe And Ductwork Insulation Showing Evidence Of Growth Or Moisture Damage To Be Removed. All Building Semi And Non-porous Surfaces - Such As But Not Limited To Cabinetry, Countertops, Metal, Glass, Rubber Baseboards, Lighting And Plumbing Fixtures - Needs To Be Thoroughly Disinfected Via Appropriate Cleaning Methods.
specifications
mold Remediation Technical Specifications
part 1 General
scope
this Specification Covers The Remediation Of Mold Including Removal, Cleanup And Disposal Of Mold Contaminated Materials From A Va Building. The Methods And Procedures In This Specification Are Based On The Observations And Previously Collected Background Air Samples.
an Estimate Of The Amount Of Material To Be Removed Or Cleaned Is Not Given. The Determination Of The Actual Amounts, For Bidding Purposes, Is The Responsibility Of The Contractor. By Submitting A Bid, The Contractor Acknowledges That He Has Investigated And Satisfied Himself As To:
the Conditions Affecting The Work, Including, But Not Limited To, Physical Conditions Of The Site Which May Affect Site Access, Handling And Storage Of Tools And Materials, Access To Water, Electricity Or Other Utilities, Or Otherwise Affect Performance Of Required Activities.
the Character And Quantity Of All Surface And Subsurface Materials Or Obstacles To Be Encountered As Far As This Information Is Reasonably Ascertainable From An Inspection Of The Site, Including Exploratory Work Done By The Building Owner Or A Designated Consultant, As Well As Information Presented In Drawings And Specifications Included With This Contract. Any Failure By The Contractor To Acquaint Himself With Available Information Will Not Relieve Him From The Responsibility For Estimating Properly The Difficulty Or Cost Of Successfully Performing The Work. The Building Owner Is Not Responsible For Any Conclusions Or Interpretations Made By The Contractor On The Basis Of The Information Made Available By The Building Owner.
description
the Work Specified Herein Shall Be The Remediation Of Mold By Competent Persons
trained, Knowledgeable And Qualified In The Techniques Of Remediation, Handling And Disposal Of Mold Contaminated Materials And The Subsequent Cleaning Of Contaminated Areas, Who Comply With All Applicable Federal, State And Local Regulations And Are Capable Of, And Willing To Perform, The Work Of This Contract.
the Contractor Shall Supply All Labor, Materials, Services, Insurance, Permits,
licenses, Patents, And Equipment Necessary To Carry Out The Work In Accordance With All Applicable Federal, State And Local Regulations And These Specifications.
the Contractor Is Responsible For Restoring The Work Area And Auxiliary Areas Utilized During The Remediation To Conditions At Least Equal To Original Conditions. (this Excludes Any Material Removed As Part Of Scope.) Any Damages Caused During The Performance Of Remediation Activities Shall Be Repaired By The Contractor (e.g., Paint Peeled Off By Barrier Tape, Nail Holes, Water Damage, Broken Glass) At No Additional Expense To The Owner.
applicable Standards And Guidelines
all Work Under This Contract Shall Be Done In Strict Accordance With All Applicable Federal, State, And Local Regulations, Standards, And Codes Governing Mold Remediation And Any Other Trade Work Done In Conjunction With The Remediation.
the Most Recent Edition Of Any Relevant Regulation, Standard, Document Or Code Shall Be In Effect. Where Conflict Among The Requirements Or With These Specifications Exists, The Most Stringent Requirements Shall Be Utilized.
specific Requirements:
title 29, Code Of Federal Regulations, 1926. Occupational Safety And Health Administration (osha), U.s. Department Of Labor.
quality Assurance
bidders Must Be Licensed As Required By The Iowa Bureau Of Labor.
bidders Shall Demonstrate Prior Experience On Mold Remediation Projects Of Similar Nature And Scope Through The Submission Of Letters Of Reference From The Owners Including The Name, Address, And Telephone Numbers Of Contact Person (someone Specifically Familiar With The Contractor's Work) For At Least Three (3) Previous Users Of Service If Requested By The Owners.
the Owner Reserves The Right To Reject Bids For Any Reason That Serves The Best Interests Of The Owner Or Building Occupants. The Owner Also Reserves The Right To Waive Any Technicality Or Irregularity In A Bid. Failure To Submit Requested
information/documentation Can Result In Automatic Disqualification Of Bid Package.
submittals And Notices
pre-remediation:
submit The Location Of The Landfill To Be Used For Disposal Of The Mold Contaminated Material.
submit A List Of All Personnel Who Will Be Involved In The Remediation Activity Including, Supervisors, Workers, And Any Other Personnel Or Agent Who May Be Responsible For Any Aspect Of The Remediation Activities.
submit Documentation From A Physician That All Employees Or Agents Have Been Medically Monitored To Determine Whether They Are Physically Capable Of Working While Wearing The Respirator Required Without Suffering Adverse Health Effects.
submit Documentation Of Respirator Fit Testing For All Employees And Agents Who Must Enter The Work Area. Document Niosh Approval Of All Respiratory Protective Devices Utilized On-site.
submit A List Of Equipment For This Project.
with The Owner Or Owner's Representative, Inspect The Premises Wherein All Remediation And Remediation Related Activities Will Occur And Submit A Statement Signed By Both, Agreeing On Building And Fixture Condition Prior To The Commencement Of The Work.
submit Manufacturer's Certification That Hepa Vacuums, Negative Pressure Ventilation Units, And Other Local Exhaust Ventilation Equipment Conform To Ansi 29.2-79.
when Rental Equipment Is To Be Used In Remediation Areas Or To Transport Mold Contaminated Waste, A Written Notification Concerning Intended Use Of The Rental Equipment Must Be Provided To The Rental Agency With A Copy Submitted To The Owner.
during Remediation Activities:
submit Weekly Job Progress Reports Detailing Remediation Activities And Progress.
submit Copies Of All Transport Manifests, Trip Tickets And Disposal Receipts For All Mold Waste Materials Removed From The Work Area During The Remediation Process.
post In The Clean Room Area Of The Worker Decontamination Enclosure:
a List Containing The Names, Addresses, And Telephone Numbers Of The Contractor, The Owner, The Assessment Professional, The Testing Laboratory And Any Other Personnel Who May Be Required To Assist During Remediation Activities.
a Logbook To Record Names Of All Personnel Who Enter The Work Area.
a Copy Of Emergency Procedures.
telephone Numbers Of All Emergency Personnel And Principals For This Remediation Project.
the Project Will Not Be Considered Completed Until All Submittals Are Received By The Owner. This Will Affect Payment For The Project.
site Security
the Work Area Is To Be Restricted Only To Authorized, Trained, And Protected Personnel. These May Include The Contractor's Employees, Employees Of
subcontractors, Owner Employees And Representatives, State And Local Inspectors And Any Other Designated Individuals.
entry Into The Work Area By Unauthorized Individuals Shall Be Reported Immediately To The Owner By The Contractor.
access To The Work Area Shall Be Through A Single Worker Decontamination System. All Other Means Of Access (doors, Windows, Hallways, Etc.) Shall Be Blocked Or Locked So As To Prevent Entry To Or Exit From The Work Area. The Only Exceptions For This Rule Are The Waste Pass Out Airlock Which Shall Be Sealed Except During The Removal Of Containerized Mold Waste From The Work Area, And Emergency Exits In Case Of Fire Or Accident. Emergency Exits Shall Not Be Locked From The Inside; However, They Shall Be Sealed With Polyethylene Sheeting And Tape Until Needed.
the Contractor Shall Have Control Of Site Security During Remediation Operations Whenever Possible, In Order To Protect Work Efforts And Equipment.
contractor Will Have Owner's Assistance In Notifying Building Occupants Of Impending Activity And Enforcement Of Restricted Access By Owner's Employees.
emergency Planning
emergency Planning Shall Be Developed Prior To Remediation Initiation And Agreed To By Contractor And Owner.
emergency Planning Shall Include Considerations Of Fire, Explosion, Toxic Atmospheres, Electrical Hazards, Slips, Trips And Falls, Confined Spaces, And Heat Related Injury. Written Procedures Shall Be Developed And Employee Training In Procedures Shall Be Provided.
employees Shall Be Trained In Evacuation Procedures In The Event Of Work Place Emergencies.
part 2 Materials And Equipment
materials
general:
deliver All Materials In The Original Packages, Containers, Or Bundles Bearing The Name Of The Manufacturer And The Brand Name.
store All Materials Subject To Damage Off The Ground, Away From Wet Or Damp
surfaces, And Under Cover Sufficient Enough To Prevent Damage Or Contamination.
polyethylene Sheeting For Walls And Stationary Objects Shall Be A Minimum Of 4 Mil Thick. For Floors And All Other Sheeting Of At Least 6 Mil Thickness Shall Be Used In Widths Selected To Minimize The Frequency Of Joints.
tape - Duct, Glass Fiber, Or Other Type Capable Of Sealing Adjacent Sheets Of Polyethylene And Capable Of Sealing Polyethylene To Dissimilar Finished Or Unfinished Surfaces Under Both Wet And Dry Conditions Including The Use Of Amended Water.
polyethylene Sheeting Utilized For Worker Decontamination Enclosure Shall Be Opaque White Or Black In Color.
disposal Bags Shall Be Of 6 Mil Polyethylene.
disposal Drums Shall Be Metal Or Fiberboard With Locking Ring Tops.
equipment
general:
a Sufficient Quantity Of Negative Pressure Ventilation Units Equipped With Hepa Filtration Shall Be Utilized To Provide One Workplace Air Change Every 15 Minutes Or A Static Pressure Within The Work Area Of At Least -0.02 Inches Of Water Column. These Ventilation Units Must Be Commercially Produced Units And Not Self-manufactured. Ventilation Units To Be Exhausted Outside.the Contractor Shall Furnish A Copy Of Their Calculations To Obtain This Air Flow Or Static Pressure If Requested By The Owner.
air Purifying Respirators Equipped With Hepa Filters Will Be Required. A Sufficient Supply Of Filters Shall Be Available In The Clean Change Area. This Requirement May
be Modified By The Assessment Professional If Air Sampling Results Indicate The Need For More Protection.
air Purifying Respirators With Dual High Efficiency (hepa) Filters May Be Utilized During Work Area Preparation Activities. Spectacle Kits And Eyeglasses Must Be Provided For Employees Who Wear Glasses And Who Must Wear Full Face Piece Respirators. Respirators Shall Be Provided That Have Been Tested And Approved By The National
institute Of Occupational Safety And Health For Use In Mold Contaminated Atmospheres.
full Body Disposable Protective Clothing, Including Head, Body And Foot Coverings (unless Using Footwear As Described In Section 2.02 (a)(6) Consisting Of Material Impenetrable By Mold (tyvek Or Equivalent) Shall Be Provided To All Workers In Sizes Adequate To Accommodate Movement Without Tearing.
additional Safety Equipment (e.g., Hard Hats, Eye Protection, Safety Shoes Meeting The Applicable Ansi Standard, Disposable Pvc Gloves) As Necessary, Shall Be Provided To All Workers And Authorized Visitors.
nonskid Footwear Shall Be Provided To All Remediation Workers. Disposable Clothing Shall Be Adequately Sealed To The Footwear To Prevent Body Contamination.
a Sufficient Supply Of Disposable Mops, Rags And Sponges For Work Area Decontamination Shall Be Available.
mobile Radios, Telephones, Etc. As Required By The Project Will Be Provided By The Contractor.
removal/cleaning Equipment:
sufficient Supply Of Scaffolds, Ladders, Lifts And Hand Tools Shall Be Provided As Needed.
sprayers With Pumps Capable Of Providing A Water Stream Or Mist For Dust Control.
rubber Dustpans And Rubber Squeegees Shall Be Provided For Cleanup.
brushes Utilized For Removing Loose Mold Containing Material Shall Have Nylon Or Fiber Bristles, Not Metal.
a Sufficient Supply Of Hepa Filtered Vacuum Systems Shall Be Available During Cleanup.
part 3 Execution
preparation
post Caution Signs At Any Location And Approaches To A Location Where Airborne Concentrations Of Mold May Exceed Ambient Background Levels. Additional Signs May Need To Be Posted Following Construction Of Workplace Enclosure Barriers.
shut Down And Lock Out Electric Power To All Work Areas As Necessary If Wet Conditions Warrant. Provide Temporary Power And Lighting. Ensure Safe Installation (including Ground Faulting) Of Temporary Power Sources And Equipment By Compliance With All Applicable Electrical Code Requirements And Osha Requirements For Temporary Electrical Systems.
shut Down And Lock Out All Heating, Cooling And Air Conditioning System (hvac) Components That Are In, Supply Or Pass Through The Work Area. Seal All Intake And Exhaust Vents In The Work Area With Tape And 6 Mil Polyethylene. Also Seal Any Seams In System Components That Pass Through The Work Area. Remove All Hvac System Filters And Place In Labeled 6 Mil Polyethylene Bags For Staging And Eventual Disposal As Mold Contaminated Waste.
due To Hvac Being Offline During Winter Conditions, Contractor To Provide Temporary Heat To Maintain Indoor Temperature Of 60 Degrees Fahrenheit Throughout Building.
the Contractor Shall Provide Sanitary Facilities For Remediation Personnel Outside Of The Enclosed Work Area And Maintain Them In A Clean And Sanitary Condition Throughout The Project.
seal Off All Windows, Doorways, Elevator Openings, Corridor Entrances, Drains, Ducts, Grills, Grates, Diffusers, Skylights, And Any Other Openings Between The Work Area And Uncontaminated Areas Outside Of The Work Area With 4 Mil Polyethylene Sheeting And Tape.
barrier Walls Will Be Constructed Of 4 Mil Polyethylene Sheeting Extending From The Ceiling To Floor.
workplace Exits
worker Decontamination Enclosure System:
worker Decontamination Enclosure Systems Shall Be Provided At All Locations Where Workers Will Enter Or Exit The Work Area.
worker Decontamination Enclosure Systems Constructed At The Work Site Shall Utilize 6 Mil Opaque White Or Black Polyethylene Sheeting Or Other Acceptable Materials For Privacy. Detailed Descriptions Of Portable, Prefabricated Units, If Used, Must Be
submitted For The Owner's Approval. Plans Must Include Floor Plan With Dimensions, Materials, Size, Thickness, Plumbing, And Electrical Utilities.
the Worker Decontamination Enclosure System Shall Consist Of At Least A Clean Room And An Airlock.
entry And Exit From The Decontamination Enclosure System Chamber Shall Be Through Curtained Doorways Consisting Of Two Sheets Of Overlapping Polyethylene Sheeting. One Sheet Shall Be Secured At The Top And Left Side, The Other Sheet At The Top And Right Side. Both Sheets Shall Have Weights Attached To The Bottom To Ensure That They Hang Straight And Maintain A Seal Over The Doorway When Not In Use.
the Clean Room Shall Be Sized To Adequately Accommodate The Work Crew. Benches Shall Be Provided As Well As Hooks For Hanging Up Street Clothes. Shelves For Storing Respirators Shall Also Be Provided In This Area. Clean Work Clothes: Clean Disposable Clothing, Replacement Filters For Respirators, Towels, And Other Necessary Items Shall Be Provided In Adequate Supply In The Clean Room. A Location For Postings Shall Also Be Provided In This Area. Whenever Possible, A Lockable Door Shall Be Used To Permit Access Into The Clean Room From Outside The Work Area. Lighting, Heat, And Electricity Shall Be Provided As Necessary For Comfort. This Space Shall Not Be Used For Storage Of Tools, Equipment Or Materials, Or As An Office Space.
waste Container Pass Out Airlock:
the Waste Container Pass Out Airlock Shall Be The Same As The Exit Entry Airlock.
emergency Exits:
emergency Exits Shall Be Established And Clearly Marked With Duct Tape Arrows Or Other Effective Designations To Permit Easy Identification From Anywhere Within The Work Area. They Shall Be Secured To Prevent Access From Uncontaminated Areas And Still Permit Emergency Exiting. These Exits Shall Be Properly Sealed With Polyethylene Sheeting Which Can Be Cut To Permit Egress If Needed. These Exits May Be The Worker Decontamination Enclosure, The Waste Pass Out Airlock And/or Other Alternative Exits Satisfactory To Fire Officials.
isolation Of The Workplace
maintenance Of Enclosure Systems:
following Completion Of The Construction Of All Polyethylene Barriers And Decontamination System Enclosures, Allow Overnight Settling To Ensure That Barriers Will Remain Intact And Secured To Walls And Fixtures Before Beginning Actual Remediation Activities.
all Polyethylene Barriers Inside The Workplace, In The Worker Decontamination Enclosure System, In The Waste Container Pass Out Airlock And At Partitions
constructed To Isolate The Work Area From Occupied Areas Shall Be Inspected At Least Twice Daily, Once Prior To The Start Of Each Day's Remediation Activities. Document Inspections And Observations In The Daily Project Log.
damage And Defects In The Enclosure System Are To Be Repaired Immediately Upon Discovery.
negative Pressure To Be Monitored With A Continuous Reading Device. A Record Of This Shall Be Furnished To The Owner. Use Smoke Tubes To Test The Effectiveness Of The Barrier System When Directed By The Owner.
at Any Time During The Remediation Activities After Barriers Have Been Erected, If Visible Material Is Observed Outside Of The Work Area Or If Damage Occurs To Barriers, Work Shall Immediately Stop, Repairs Be Made To Barriers, And Debris/residue Cleaned Up Using Appropriate Hepa Vacuuming And Wet Mopping Procedures.
install And Initiate Operation Of Negative Pressure Ventilation Equipment As Needed To Provide One Air Change In The Work Area Every 15 Minutes Or Produce A Static Pressure Of -0.02 Inches Of Water Column. (see Section 2.02 (a)) Openings Made In The Enclosure System To Accommodate These Units Shall Be Made Airtight With Tape And/or Caulking As Needed. If More Than One Unit Is Installed, They Should Be Turned On One At A Time, Checking The Integrity Of Wall Barriers For Secure Attachment And The Need For Additional Reinforcement. Ensure That Adequate Power Supply Is Available To Satisfy The Requirements Of The Ventilating Units. Negative Pressure Ventilation Units Shall Be Exhausted To The Outside Of The Building Whenever Feasible. Additional Negative Pressure Ventilation Units May Be Exhausted Inside The Work Area To Provide Continuous Air Cleaning. They Shall Not Be Exhausted Into Occupied Areas Of The
building. Twelve-inch Extension Ducting Shall Be Used To Reach From The Work Area To The Outside When Required. Careful Installation, Air Monitoring And Daily Inspections Shall Be Done To Ensure That The Ducting Does Not Release Fibers Into Uncontaminated Building Areas.
once Constructed And Reinforced As Necessary, With Negative Pressure Ventilation Units In Operation As Required, Test Enclosure For Leakage Utilizing Smoke Tubes. Repair Or Reconstruct As Needed.
workplace Entry And Exit Procedures
personnel Entry And Exit:
all Workers And Authorized Personnel Shall Enter The Work Area Through The Worker Decontamination Enclosure System. Workers Shall Not Eat, Chew, Or Smoke Once They Have Entered The Work Area. Eating May Take Place Just Outside The Clean Room. Smoking, At Any Time During The Project, Is Prohibited On The Campus.
all Personnel, Before Entering The Work Area, Shall Read And Be Familiar With All Posted Regulations, Personal Protection Requirements (including Workplace Entry And Exit Procedures) And Emergency Procedures. A Sign Off Sheet Shall Be Used To Acknowledge That These Procedures Have Been Reviewed And Understood By All Personnel Prior To Entry.
all Personnel Shall Proceed First To The Clean Room And Appropriately Don Respiratory Protection And Launderable And/or Disposable Coveralls, Head Covering, And Foot Covering. Hard Hats, Eye Protection, And Gloves Shall Also Be Utilized If Required. Clean Respirators And Protective Clothing Shall Be Provided And Utilized By Each Person For Each Separate Entry Into The Work Area.
personnel Wearing Designated Personal Protective Equipment Shall Proceed From The Clean Room Through The Airlock Into The Main Work Area.
before Leaving The Work Area All Personnel Shall Remove Gross Contamination From The Outside Of Respirators And The Outer Protective Clothing By Brushing And/or Wet Wiping Procedures. Each Person Shall Clean Bottoms Of Protective Footwear Just Prior To Entering The Airlock.
personnel Shall Proceed To The Airlock Where They Remove The Outer Protective
equipment Except Respirators. Deposit Disposable And/or Launderable Clothing Back Into The Work Area Into Appropriately Labeled Containers For Disposal And/or
laundering.
reusable, Contaminated Footwear Shall Be Stored In The Airlock When Not In Use In The Work Area. Upon Completion Of Remediation, It Shall Be Disposed Of As Mold Contaminated Waste. Rubber Boots May Be Decontaminated At The Completion Of The Remediation Project For Reuse.
still Wearing Respirators, Personnel Shall Proceed To The Clean Room, Clean The Outside Of The Respirators And The Exposed Face Area Under Running Water Prior To Removal Of Respirator. Various Types Of Respirators Will Require Slight Modification Of These Procedures.
don Clean Disposable And/or Launderable Clothing If There Will Be Later Reentry Into The Work Area Or Street Clothes If It Is The End Of The Work Shift.
these Procedures Shall Be Posted In The Clean Room And Equipment Room.
waste Container Pass Out Procedures:
mold Contaminated Waste That Has Been Containerized Shall Be Transported Out Of The Work Area Through The Waste Container Pass Out Airlock Or Through The Worker Decontamination Enclosure If A Separate Airlock Has Not Been Construction.
waste Pass Out Procedures Shall Utilize Two Teams Of Workers, An "inside" Team And An "outside" Team.
the Inside Team Wearing Appropriate Protective Clothing And Respirators For Inside The Work Area Shall Clean The Outside, Including Bottoms, Containers (bags, Drums, Or Wrapped Components) Using Hepa Vacuums And Wet Wiping Techniques And
transport Them Into The Waste Container Pass Out Airlock.
the Outside Team, Wearing Appropriately Assigned Respirators, Shall Enter The Airlock From The Outside Of The Work Area, Remove Them From The Airlock To The Outside. No Worker From The Outside Team Shall Further Enter The Work Area Through This Airlock. The Exit From This Airlock Shall Be Secured When Not In Use To Prevent Unauthorized Entry.
personnel Protection Requirements
training:
prior To Commencement Of Remediation Activities, The Contractor Shall Have One Person Designated As A Competent Supervisor. This Person Shall Be On-site At All Times.
special On-site Training On Equipment And Procedures Unique To This Job Site Shall Be Performed As Required.
training In Emergency Response And Evaluation Procedures Shall Be Provided.
respiratory Protection:
all Respiratory Protection Shall Be Provided To Workers In Accordance With The Written Respiratory Protection Program, Which Includes All Items In
osha 29 Cfr 1910.134 (b)(1-11). This Program Shall Be Posted In The Clean Room Of The Worker Decontamination Enclosure System.
workers Shall Be Provided With Personally Issued, Individually Identified Respirators.
respirator Types Shall Be Utilized According To The Following Schedule:
full Face Air Purifying Respirators With Dual Hepa Filters Shall Be Utilized By Workers During Remediation Operations.
full Face Powered Air Purifying Respirators Equipped With Hepa Filters May Be Used During Remediation Activities.
fit Testing:
workers Must Perform Positive And Negative Air Pressure Fit Tests Each Time A Respirator Is Put On, Wherever The Respirator Design So Permits. Powered Air Purifying Respirators Shall Be Tested For Adequate Flow As Specified By The
manufacturer.
workers Shall Be Given A Qualitative Fit Test In Accordance With Procedures Detailed In The Osha Lead Standard (29 Cfr 1910.1025, Appendix D, Qualitative Fit Test Protocols) For All Respirators To Be Used On This Remediation Project. An Appropriate
administered Quantitative Fit Test May Be Substituted For The Qualitative Fit Test.
documentation Of Adequate Respirator Fit Must Be Provided To The Owner.
no One Wearing A Beard Shall Be Permitted To Don A Respirator And Enter The Work Area.
protective Clothing:
disposable Clothing Including Head, Foot, And Full Body Protection Shall Be Provided In Sufficient Quantities And Adequate Sizes For All Workers And Authorized Visitors.
launderable Clothing, If Required, Shall Be Provided In Sufficient Quantities And Adequate Sizes For All Workers And Authorized Visitors.
hard Hats, Protective Eyewear, Gloves, Rubber Boots, And/or Other Footwear Shall Be Provided As Required For Workers And Authorized Visitors. Safety Shoes May Be Required For Some Activities.
commencement Of Work
enclosure Systems Have Been Constructed And Tested.
negative Pressure Ventilation Systems Are Functioning Adequately.
all Pre-remediation Submissions, Notifications, Postings, And Permits Have Been Provided And Are Satisfactory To The Owner.
all Equipment For Remediation, Cleanup, And Disposal Are On Hand.
all Worker Training Is Completed.
contractor Receives Written Permission From The Owner To Commence Remediation.
removal/cleaning Procedures
protection Of Materials Not Being Removed:
materials That Are Not Being Removed Are To Be Protected From Any Damage That May Occur During Work. The Acoustic Ceiling Tile Suspension Grid Is To Be Cleaned Yet Remain In Place And Is Not To Be Damaged During The Removal Of The Tiles.
level One:
clean And Isolate Active Work Areas In Accordance With Section 3.01.
wet All Mold Containing Materials With An Approved Biocide Solution Using Equipment Capable Of Providing A Fine Spray Mist, To Reduce Airborne Concentrations When The Material Is Disturbed. Keep All Removed Material Wet Enough To Prevent Release Until It Can Be Containerized For Disposal.
removal And Cleaning:
all Acoustic Ceiling Tiles, All Carpet Throughout The Entire Building Are To Be Removed And Properly Disposed Of.
non-porous Materials - All Non-porous Surfaces Are To Be Cleaned Using A
detergent Solution Or Solution Of Contractor's Choice That Will Re Move Mold. Hepa Vacuums May Be Used Along With The Solution For Cleaning.
all Materials Need To Be Dried. Examples Of Non-porous Materials Include:
metal
glass
hard Plastics
plumbing Fixtures
all Hvac Diffusers Are To Be Removed, Thoroughly Cleaned (as Detailed Above) And Set Aside Per Owner S Direction To Be Re-installed Later.
semi-porous (e.g. Wood Doors, Unsealed Concrete) All Semi-porous Surfaces Are To Be Cleaned Using A Detergent Solution Or Solution Of Contractor's Choice That Will Remove Mold. This Solution Must Be Approved By Owner. Hepa Vacuums May Be Used Along With The Solution For Cleaning. All Materials Need To Be Dried. Examples Of Semi-porous Materials Include:
wood
concrete
porous Materials - Remove All Porous Materials Where Visible Mold Growth Or Evidence Of Moisture Is Present. The Materials Should Be Removed, Bagged And Discarded. Examples Of Porous Materials Include:
drywall
insulation Of All Types
carpet (all Being Removed, Regardless Of Evidence)
acoustic Ceiling Tiles (all Being Removed, Regardless Of Evidence)
containers (6 Mil Polyethylene Bags) Shall Be Sealed When Full. Bags Shall Not Be Overfilled. They Should Be Securely Sealed To Prevent Accidental Opening And Leakage By Tying Tops Of Bags In An Overhead Knot Or By Taping In
gooseneck Fashion. Do Not Seal Bags With Wire Or Cord. Bags Shall Be Decontaminated On Exterior Surfaces By Wet Cleaning And Hepa Vacuuming.
large Components Removed Intact May Be Wrapped In 2 Layers Of 6 Mil Polyethylene Sheeting Secured With Tape For Transport To The Landfill.
mold Containing Waste With Sharp Edged Components (e.g., Nails, Screws, Metal Lath, Tin Sheeting) Will Tear The Polyethylene Bags And Sheet And Shall Be Reinforces With Extra Bags Or Wrapping.
cleanup Procedure
remove And Containerize All Visible Accumulations Of Mold Containing Material And Mold Contaminated Debris Utilizing Rubber Dust Pans, Rubber Squeegees, Hepa
vacuums, Etc.
remove All Containerized Waste From The Work Area And Waste Container Pass Out Airlock.
decontaminate All Tools And Equipment And Remove At The Appropriate Time In The Cleaning Sequence.
inspect The Work Area For Visible Residue. If Any Accumulation Of Residue Is Observed, It Will Be Assumed To Be Mold And The Work Area Must Be Re-cleaned.
the Work Area Shall Be Cleaned Until It In Compliance With Criteria Agreed Upon By The Contractor And Owner Prior To Initiation Of Remediation Activities.
following The Satisfactory Completion Of Clearance Criteria Remaining Barriers May Be Removed And Properly Disposed Of. A Final Visual Inspection By The Owner Shall Ensure That No Contamination Remains In The Work Area. Unsatisfactory Conditions May Require Additional Cleaning And Air Monitoring (see Section 3.11, Reestablishment Of The Work Area).
clearance Testing
following The Completion Of Cleanup Operations, The Remediation Contractor Shall Notify The Owner (or Industrial Hygiene Consultant Selected By Owner) When The Building Area Is Ready For Clearance Testing. Remediation Contractor Will Not Be Responsible For Performing Clearance Testing. The Owner (via Contracted Industrial Hygienist) Shall Arrange For Collecting Samples.
3.10 Disposal Procedures
general:
as The Work Progresses, To Prevent Exceeding Available Storage Capacity Onsite, Sealed And Labeled Containers Of Mold Containing Waste Shall Be Removed And Stored In The Dumpster On-site Until It Is Transported To The Prearranged Disposal Location.
all Waste Shipment Records Shall Be Delivered To The Owner. A Recommended Record Keeping Format Utilizes The Waste Shipment Record (wsr) Which Includes The Names And Addresses Of The Generator (owner), Contractor, Transporter, And Disposal Site, The Estimated Quantity Of The Mold Waste And The Type Of Containers Used.
transportation To The Landfill:
once Drums, Bags And Wrapped Components Have Been Removed From The Work Area, They Shall Be Loaded Into An Enclosed Truck Or Dumpster For Transportation.
any Debris Or Residue Observed On Containers Or Surfaces Outside Of The Work Area Resulting From Cleanup Or Disposal Activities Shall Be Immediately Cleaned Up Using Hepa Filtered Vacuum Equipment And/or Wet Methods As Appropriate.
large Metal Dumpsters Are Sometimes Used For Mold Waste Disposal. These Should Have Doors Or Tops That Can Be Closed And Locked To Prevent Vandalism Or Other Disturbance Of The Bagged Mold Debris And Wind Dispersion Of Mold Fibers. Bags Shall Be Placed, Not Thrown, Into These Containers To Avoid Splitting.
disposal At The Landfill:
upon Reaching The Landfill, Trucks Are To Approach The Dump Location As Closely As Possible For Unloading Of The Mold Containing Waste.
bags, Drums, And Components Shall Be Inspected As They Are Off Loaded At The Disposal Site. Waste Containers Shall Be Placed On The Ground At The Disposal Site, Not Pushed Or Thrown Out Of The Trucks.
following The Removal Of All Containerized Waste, The Truck Cargo Area Shall Be Decontaminated Using Hepa Vacuums And/or Wet Methods To Meet The No Visible Residue Criteria.
3.11 Re-establishment Of The Work Area And Systems
re-establishment Of The Work Area Shall Only Occur Following The Completion Of Cleanup Procedures And After Clearance Criteria Have Been Met And Documented To The Satisfaction Of The Owner.
the Contractor And Owner Shall Visually Inspect The Work Area For Any Remaining Visible Residue. Evidence Of Contamination Will Necessitate Additional Cleaning Requirements In Accordance With Section 3.07.
following Satisfactory Clearance Of The Work Area, Remaining Polyethylene Barriers May Be Removed And Disposed Of As Mold Contaminated Waste.
at The Discretion Of The Contractor, Mandatory Requirements For Personal Protective Equipment May Be Waived Following The Removal Of All Barriers.
re-secure Mounted Objects Removed From Their Former Positions During Area Preparation Activities.
relocate Objects That Were Removed To Temporary Locations Back To Their Original Positions.
reestablish Hvac, Mechanical And Electrical Systems In Proper Working Order. Remove Contaminated Hvac System Filters And Dispose Of As Mold Contaminated Waste. Decontaminate Filter Assembly Using Hepa Vacuums And Wet Cleaning Techniques. Install New Filters In Hvac Systems. Dispose Of Old Filters.
repair All Areas Of Damage That Occurred Because Of Remediation Activities.
period Of Performance
upon Notice To Proceed, Contractor Shall Have 30 Calendar Days To Complete The Scope Detailed In This Document.
Closing Date14 Jan 2025
Tender AmountRefer Documents
City Government Iligan Tender
Civil And Construction...+1Building Construction
Philippines
Details: Description Invitation To Re-bid The Iligan City Government Bids And Awards Committee (bac), Through Special Educational Fund Intend To Apply The Sum Of P 4,830,913.32 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Three-storey Guidance And Counselling Building, Iligan City National High School (icnhs), Brgy. Mahayahay, Iligan City With Project No. Cb(b)-24-130 (ceo-infra) Re-bid. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Iligan City Government Bids And Awards Committee Now Invites For The Supply And Delivery Of Items Below-stated: Particulars Three-storey Guidance And Counselling Building, Iligan City National High School (icnhs), Brgy. Mahayahay, Iligan City •general Requirements -pennits & Clearances; -installation Of Project Billboard,2 Sets; -occupational Safety & Health Program; •clearing & Grubbing -cutting Of Trees; •earthworks -excavation For Foundation, Tie Beam, Wall-footing , Zocalo, Septic Vault, Concrete Storage, Stairs Foundation & Grease Trap; -backfilling & Compaction For The Slab On Grade; -gravel Bedding For Foundation , Tie Beam, Wall-footing , Slab On Grade, Zocalo, Septic Vault , Concrete Storage, Stairs Foundation & Catch Basin; •concrete Works, Forms & Scaffoldings -concrete Pouring For Foundation , Columns, Tie Beam, 2nd & 3rd Floor Beams, Suspended Slab, Roof Beams , Cantilever Beams, Slab On Grade, Wall-footing (foundation) , Zocalo (foundation) , Septic Vault Flooring (top & Bottom), Concrete Storage (foundation), & Catch Basin Flooring; •masonry Works -installation Of 4" X 8" X 16" Concrete Hollow Blocks (chb) For Wallings At Ground Floor, Balcony (2nd Floor) , Parapet,wall-footing ,septic Vault, Catch Basin, Concrete Storage & Zocalo, W/plaster Finish,& Smooth On Expose Areas; -using 10mmø X 6m Deformed Steel Bars Wf#.16 G.i Tie Wire; And Vertical Spaced @600mm O.c & For Horizontal, Every @3rd Layer; •steel Reinforcement -using 10mmø, 12mmø, 16mmø & 20mmø Deformed Steel Bars Wf#.16 G.i Tie Wire; •paint Works & Finishes; -skim Coating Only For All Wallings At Ground Floor Only; •steel Works -fabrication & Installation Of 50mm X 50mm X 6mm Thk., 38mm X 38mm X 6mm Thk., 38mm X 38mm X 4.smm Thk ., 25mm X 25mm X 4.smm Thk., 25mm X 25mm X 2mm Thk. Angle Bar,25mm X 25mm X 3/16" Thk. Angle Bar, 25mm X 3/16" Thk. Flat Bar. 2" X 4" X 1.smm Thk. C-purtins W/ 10mmø Dsb Sagrods, 12mmø Turnbuckle & Cross Brace; 10mmø Anchor Bolt,epoxy Primer; -installation Of Stainless Steel Square Tube Railings- Grade 304 For Stairs & Balcony; •tinsmithry Works -installation Of 0.4mm Thk. Colored Roof Long-span Rib Type,0.4mm Thk. Pre-fab End Flashing, 0.4mm Thk. Pre-fab Fascia Cover,& 0.30m X 2.40m X 0.4mm Thk. Pre-fab Colored Gutter Spanish Type W/complete Accessories ; •electrical Works ; -electrical Works At Ground Floor, & Provisions; •plumbing Works; -installation Of Plumbing Fixtures At Ground Floor Only; -installation Of 3"ø Pvc Pipe For Downspout W/ G.i Basket Strainer, Pvc Pipe Clip W/complete Accessories ; -provision Of Pvc & G.i Pipes For 2nd Floor & 3rd Floor Fixtures; I. Permits And Clearance (q = 1.00 Lumpsum) Includes Fire, Brgy. Clearance For Construction Fee, Professional Fee, White Print (a-3)-6 Sets Of Plans. Ii. Construction Safety And Health Program (q = 1.00 Lot) Includes Safety Shoes, Safety Helmet, Safety Gloves, Specialized Ppe, First Aide Kit & Medicines. Iii. Project Billboard (q = 2.00 Set/s) Includes 4' X 8' Tarpaulin Print Billboard, 8' X 8' Tarpaulin Print Billboard, 2"x 2"x 8' Coco Lumber, 2"x 2"x 10' Coco Lumber, 2"x 2"x 14' Coco Lumber, Assorted Sizes C.w Nails. Iv.mobilization & Demobilization (q = 1.00 Lot) V.clearing And Grubbing (q = 1.00 Lot) Vi. Earthworks (q = 147.48 Cu.m) Includes Volume To Be Excavated, Volume To Be Backfilled, Pit Run Soil/earthfill (backfilling Suitable Materials), Gravel Bedding (1-1/2"ø). Vii. Concrete Works, Formworks And Scaffoldings (q = 75.99 Cu.m) Includes Portland Cement, Washed Sand, Washed Gravel, 4' X 8' X 1/4" Thk. Marine Plywood, Assorted Sized Coco Lumber, Assorted Sized C.w Nails. Viii. Masonry Works (q = 284.81 Sq.m) Includes 4" X 8" X 16" Chb, Portland Cement, Washed Sand, 10mm Dia. X 6m Dsb, #16 G.i Tie Wire. Ix.steel Reinforcements (q = 16,429.80 Kgs.) Includes 10mm Dia. X 6m Dsb, 12mm Dia. X 6m Dsb, 16mm Dia. X 6m Dsb, 20mm Dia. X 6m Dsb, #16 G.i Tie Wire. X.steel Works (q = 2,034.40 Kg/s) Includes 50mm X 50mm X 6m X 6mm Thk. Angle Bar- 16pcs, 38mm X 38mm X 6m X 4.smm Thk. Angle Bar- 20pcs, 38mm X 38mm X 6m X 6mm Thk. Angle Bar- 23pcs, 25mm X 25mm X 6m X 4.5mm Thk. Angle Bar- 24pcs, 25mm X 25mm X 6m X 2.0mm Thk. Angle Bar- 7pcs, 1" X 1" X 6m X 3/16" Thk. Angle Bar- 4pcs, 25mm X 6m X 3/16" Thk. Flat Bar- 3pcs, 50mm X 100mm X 6m X 1.5mm Thk. C-purlins- 20pcs, 12mmø X 6mm Plain Bar Cross Brace- 8pcs, 12mmø Turnbuckle, Sagrods-10mmø X 6mm Dsb- 18pcs, 10mmø Anchor Bolt (l-type), Welding Rod (6011), 2" X 3" X 6m X 1.0mm Thk. Stainless Steel Rectangular Tube- Grade 304, 2" X 2" X 6m X 1.0mm Thk. Stainless Steel Rectangular Tube- Grade 304, Stainless Welding Rod (1.60mm), Epoxy Primer, 4" Paint Brush, 4"ø Cutting Disc, 4"ø Grinding Disc, Assorted Sand Paper. Xi.tinsmithry (q = 80.73 Sq.m) Includes 0.4mm Thk. Colored Roof Long Span Rib Type, Pre-fab Colored End Flashing (0.4mm Thk. X 8'), 0.30m X 2.40m X 0.4mm Thk. Pre-fab Colored Gutter Spanish Type, Pre-fab Colored Fascia Cover (0.4mm Thk. X 8'), Sealant, Teksrew, Blind Rivets (1000pcs/box), Riveter, Aviation Metal Snip Scissor. Xii. Paint Works & Finishes (q = 388.99 Sq.m) Includes Skim Coat, Sand Paper. Xiii. Electrical Works (q = 1.00 Lot) Includes 2.0mm2 Thhn Stranded Copper Wire, 3.5mm2 Thhn Stranded Copper Wire, 8.0mm2 Thhn Stranded Copper Wire, 14.0mm2 Thhn Stranded Copper Wire, 38.0mm2 Thhn Stranded Copper Wire, Pvc Conduit 15mm, Pvc Elbow 15mm, Junction Box 4x4", Utility Box 2x4", Pvc Conduit 20mm, Pvc Elbow 20mm, Emt Conduit 32mm, Emt Coupling 32mm, Service Entrance Cap 32mm, Secondary Rack With 2 Spool, Duplex Convenience Outlet, Airconditioning Outlet, Single Gang Switch With Led Indicator 230v, Two Gang Switch With Led Indicator 230v, Three Gang Switch With Led Indicator 230v, Single Gang Three Way Switch With Led Indicator 230v, Led Panel Light Recessed Round Type 18w (230v), Led Panel Light 30x60 24w (230v Daylight), Led Panel Light 30x30 18w (230v), Circuit Breaker 2 Pole 15at (230v Plug In Type), Circuit Breaker 2 Pole 20at (230v Plug In Type), Circuit Breaker 2 Pole 60at (230v Plug In Type), Electrical Panelboard 10 Holes 8 Branches Plug In Type, Mccb 125 At 2 Pole 230v, Enclosure For 125 At Mccb, Solvent Cement 100cc, Minor Electrical Peripherals. Xiv. Plumbing Works (q = 1.00 Lot) Includes 6" Dia. X 10' Pvc Pipe S-1000, 4" Dia. X 10' Pvc Pipe S-1000, 4" Dia. Pvc Sanitary Tee (s-1000), 4" Dia. Pvc Elbow 1/4 Bend (90 Deg.), 4" Dia. Pvc Elbow 1/8 Bend (45 Deg.), 4" Dia. Pvc Coupling, 4" Dia. Pvc Clean Out W/adapter & Plug, 4" X 2" Dia. Pvc Coupling Reducer, 4" Dia. Pvc Cross Tee, 3" Dia. X 10' Pvc Pipe S-1000, 3" Dia. Pvc Elbow 1/4 Bend (90 Deg.), 3" X 2" Dia. Pvc Coupling Reducer, 3" X 2" Dia. Pvc Wye, 3" Dia. Pvc Elbow 1/8 Bend (45 Deg .), 3" Dia. Pvc Clean Out W/adapter & Plug, 3" Dia. Pvc Sanitary Tee (s-1000), Pvc Pipe Strap/clip, Bolt (54pcs), Nut (54pcs) And Washer (54pcs), 2" Dia. X 10' Pvc Pipe S-1000, 2" Dia. Pvc Tee, 2" Dia. Pvc P-trap, 2" Dia. Stainless P Trap, 2" Dia. Pvc Elbow 1/4 Bend (90 Deg.), Pvc Cement (400cc), 1/2" Dia. X 20' G.i Threaded Pipe Water Supply Line, 1/2" Diam. G.i Threaded Pipe Elbow (90deg.), 1/2" Diam. G.i Threaded Pipe Tee, 1/2" Diam. G.i Threaded Union Patente, G.i Basket Strainer, 4" X 4" Stainless Floor Drain, Water Closet W/complete Fittings/accessories-heavy Duty, Lavatory -heavy Duty, Faucet W/complete Accessories-heavy Duty, Teflon Tape (3/4" X 10m). Approved Budget For The Contract (abc): P 4,830,913.32 Required Bid Security: 2% Of The Abc If Cash, Manager’s Check; Bank Draft/guarantee, Irrevocable Letter Of Credit Confirmed Or Authenticated By A Universal Or Commercial Bank; And 5% Of The Abc If Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security Delivery Period Is Within One Hundred Eighty (180) Calendar Days From Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. Interested Bidders May Obtain Further Information From Iligan City Government And Inspect The Bidding Documents During Office Hours From 8:00 A.m. – 12:00 P.m. And 1:00 P.m. – 5:00 P.m. At The Office Of The Bids And Awards Committee, Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule 1.issuance Of Bid Documents: December 10, 2024 – January 7, 2025 – 8:00 A.m. At Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. 2.pre-bid Conference: December 17, 2024 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 3.submission Of Bids: January 7, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 4.opening Of Bids: January 7, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City A Complete Set Of Bidding Documents Will Be Available To Prospective Bidders Upon Payment Of A Non-refundable Amount Of P 5,000.00 To The Iligan City Government Cashier, At The Bac Office, Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City.the Iligan City Government Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Furthermore, The City Government Of Iligan Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Or Loss Incurred In The Preparation And Submission Of The Eligibility Statements And Bids. Approved By: (signed) Darwin J. Manubag, Phd. Bac Chairman Date Of Advertisement/posting: December 10, 2024 Place Of Posting/advertisement: City Hall/ibjt Bulletin Boards, Iligan Official Website, Phil-geps Itb No. 24-130 (ceo-infra)
Closing Date7 Jan 2025
Tender AmountPHP 4.8 Million (USD 83.2 K)
Philippine Army Tender
Textile, Apparel and Footwear
Philippines
Details: Description The Philippine Army, Through The Philippine Army Appropriation Cy 2024 And The Dbm-approved Myca Dated 5 March 2024 Intends To Apply The Sum Of One Billion Six Hundred Thirty One Million Nineteen Thousand Pesos (php1,631,019,000.00) Being The Abc To Payments Under The Contract For Procurement Of Five Hundred Forty Three Thousand Six Hundred Seventy Three (543,673) Pairs Of Philippine Army Combat Boots, Olive Drab For Field Use. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. In This Bidding Documents, We Will Refer To Php1,631,019,000.00 As Total Abc. While Stated Below As Annual Abc: Implementation Schedule Quantity Amount 2025 109,879 Pairs Php329,637,000.00 2026 109,605 Pairs Php328,815,000.00 2027 109,206 Pairs Php327,618,000.00 2028 109,068 Pairs Php327,204,000.00 2029 105,915 Pairs Php317,745,000.00 Total 543,673 Pairs Php1,631,019,000.00 2. The Philippine Army Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required Two Hundred Forty (240) Calendar Days From The Receipt Of Notice To Proceed (ntp) By The Supplier For Each Year, Which Date Shall Not Be Later Than Seven (7) Days From The Issuance Of Ntp. Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Open Only To All Local Shoe Manufacturers As Prescribed Under Ra 9290 And Its Irr And Further Subject To The Conditions Of Eligibility Provided In The 2016 Revised Irr Of Ra 9184. 4. Prospective Bidders May Obtain Further Information From The Philippine Army And Inspect The Bidding Documents At The Address Given Below Office Hours (8:00am To 4:00pm) On Weekdays Only (except Holidays). Philippine Army Bids And Awards Committee 1 Qm Pabac1 033-25 Page 6 Procurement Of 543,673 Pairs Pa Combat Boots Od For Fu (rebid) 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb In The Amount Of Seventy Five Thousand Pesos (php75,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. 6. The Philippine Army Through Pabac1 Will Hold A Pre-bid Conference On The Time And Date As Specified Below At The Office Of The Pabac1, Fort Andres Bonifacio, Taguig, And/or Through Video Conferencing Or Webcasting Via Zoom, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before The Date Of Submission. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On The Date As Specified Below And At The Given Address Below And/or Through Video Conferencing Or Webcasting. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. The Schedule Of The Bidding Activities Shall Be As Follows: Activities Time And Date Venue 1. Sale And Issuance Of Bidding Documents 8:00am To 4:00pm Mondays To Fridays Only Starting On _____________ Pabac1 Secretariat/ Conference Room, Pabac Building, Fort Andres Bonifacio, Taguig City 2. Pre-bid Conference January 06, 2025 08:30 A.m. 3. Deadline Of Submission Of Bids January 20, 2025 At 08:30 A.m. 4. Opening Of Bids And Evaluation January 20, 2025 At 08:30 A.m. Onwards 10. The Philippine Army Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Tie Breaking Method Shall Be Non-discretionary And Non-discriminatory. The Same Shall Be Based On Sheer Luck Or Chance (toss Coin) And In Chronological Order Based On The Submission Of Bids. 11. For Further Information, Please Refer To: Office Of The Pa Bids And Awards Committee 1 Fort Andres Bonifacio, Taguig City Philippine Army Bids And Awards Committee 1 Qm Pabac1 033-25 Page 7 Procurement Of 543,673 Pairs Pa Combat Boots Od For Fu (rebid) Bgen Jesus Jeffrey F Grapa Pa Pabac1 Chairperson Contact Nr. +63999-321-1164/+63977-488-0012 Telephone Nr. 845-9555 Local 6891 Email Address: Pabacsec@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: • Philgeps.gov.ph • Army.mil.ph Date Of Issue: ____________________ ___________________________ Bgen Jesus Jeffrey F Grapa Pa Pabac1 Chairperson
Closing Date20 Jan 2025
Tender AmountPHP 1.6 Billion (USD 27.8 Million)
Bureau Of The Treasury Tender
Manpower Supply
Philippines
Details: Description Description : Supply Of Security Services Brief Description : Provision Of Personnel To Perform Security Services To Btr Regional Office Located At Pres. Corazon C. Aquino Regional Government Center, Balintawak, Pagadian City, Zamboanga Del Sur And To The Provincial Offices Of Zamboanga City, Zamboanga Del Norte And Basilan No. Of Days Work : 365 Days Duration Of The Contract : January 01, 2025 To September 30, 2025 Approved Budget For The Contract : Regional Office 2 P 40, 870.00 X 9 Months = P 367, 830.00 Po - Zamboanga City/ Sibugay 1 20,336.00 X 9 Months = 183, 024.00 Po - Zamboanga Del Norte 1 20,336.00 X 9 Months = 183, 024.00 Po - Basilan 1 20,336.00 X 9 Months = 183, 024.00 Total P 101,878.00 P 916,902.00 I. Scope Of Work And Services A. The Security Guard/s Shall Perform The Following: Regional Office - Each Of The Two (2) Security Guards Shall Perform Work Of Eight (8) Hours Per Day, Seven (7) Days A Week Inclusive Of Regular And Special Holidays. Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices - Three (3) Security Guards For The Respective Provincial Offices To Perform Work Of (8) Hours Per Day, Seven (7) Days A Week Inclusive Of Regular And Special Holidays. 1. Safeguard The Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices, Their Attached Structures And Facilities From Fire, Criminal Infiltration, Economic Sabotage, Electronic Attack, Bomb Threats, Flood Damage, Vandalism, And Other Forms Of Physical Destruction. Term Of Reference: Security Agency For Cy 2025 Page 2 Of 9 2. Safeguard The Vehicles, Furniture And Other Materials Against Theft, Robbery, Fire, Arson And Other Form Of Crimes. 3. Safeguard The Btr Personnel, Clients And Visitors Against Harm Or Threats While Within The Offices’ Premises During Official Hours, Including Off-hours Whenever Their Access Are Authorized. 4. Promote And Maintain Peace And Order Within The Premises Of Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices, The Assigned Areas Of Responsibility Including, But Not Limited To, The Designated Restricted And High-risk Areas Within The Premises. 5. Expedite Any And All Activities In Support Of The Mission And Objectives Of The Btr Including All Legal And Lawful Instructions Handed Down By The Higher Authority. 6. Record And Document In The Security Guard’s Logbook Or Journal All Significant Events Occurring In His Area Of Responsibility And/or Report In Writing Any Incident Inimical To The Safety And Integrity Of The Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices. 7. Maintain Proper Decorum, Personal Discipline, Grooming, And Decent Uniform While On Duty And Refrain From Reading Newspapers, Using Cellular Phones And Gadgets, Drinking Alcoholic Beverages, Taking Prohibited Drugs, Or Any Other Activities That Will Cause Distraction In The Proper Performance Of His Duty. 8. Comply With Orders, Circulars, And Other Policies Of The Btr, Including Lawful Orders Of The Regional Director, The Heads Of Provincial Offices, Or Their Authorized Representatives. 9. To Strictly Comply With Republic Act No.5487, As Amended By P.d. 1919, Otherwise Known As The Private Security Law, And Its Implementing Rules And Regulations Issued By The Director General Of The Philippine National Police. Ii. Strategic Areas To Be Covered By Security Services A. Perimeter Area(s); B. All Floors From Ground Floor To Rooftop, Including The Garage And Utility Areas Of The Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices; C. All Property Of The Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices, Beginning From Ground Floor To Rooftop. Term Of Reference: Security Agency For Cy 2025 Page 3 Of 9 Iii. Schedule Of Requirements The Following Shall Be Provided By The Contractor: Item No. Qty. Description Bidder’s/supplier’s Compliance 1. *5 Sgs Security Guards Must Be: I. Filipino Male Citizen Ii. Preferably Those Who Have Completed 72 Units In College. Iii. Preferably With Experience In Guarding Government Facility Iv. Able To Communicate In Oral And Written English. V. Physical And Mentally Fit To Perform Security Duty. Vi. 25-45 Years Of Age. Vii. Minimum Height: 5 Ft. And 5 Inches Viii. Undergone Pre-licensing Training Administered Or Authorized By Pnpsosia. (provide Proof Of Training) Ix. Able To Prepare Investigation/spot Reports. X. Passed Np Evaluation And Drug Testing With Proof Of Compliance. Xi. Must Have Undergone Special Trainings On Anti-terrorism; Basic Fire Safety/prevention And Suppression; Basic First Aid And Self-defense Xii. Must Possess A Valid Security License As Of Bidding Date And During Tour Of Duty (submit Copy Of License). Xiii. Must Exhibit Good Moral Character, Honesty, Alertness. Xiv. Must Not Have Been Charged Nor Convicted Of Any Offense Involving Moral Turpitude (submit Appropriate Clearance, Barangay, Police And Nbi). 2 Materials/equipment/supplies To Be Provided By The Contractor, Per Sg: I. Prescribed Basic Uniforms Ii. Nightstick/baton Iii. Whistle Iv. Timepiece V. Writing Pen Term Of Reference: Security Agency For Cy 2025 Page 4 Of 9 Vi. Notebook And Duty Checklist (electronic Or Not) Vii. Flashlight Viii. First Aid Kit Ix. Service Firearms With Full Capacity Ammo. Load Plus Spare (subj. To Compliance With Pnp Guidelines On The Carrying Of Firearms And Ammunitions). X. Metal Detector Xi. Communication Radio (optional) Xii. Raincoat/pontio The Contractor Shall Provide The Abovementioned Security Personnel With Equipment That Should Be 100% Operational At All Times For The Duration Of The Contract. As To The Issued Firearms, They Must Be Of Genuine Brand Acquired From A Legitimate Source(s). No Paltiks Guns. Iv. Technical Specifications Technical Parameters Based On Gppb Circular No. 24-2007 Item No. Description Bidder’s/supplier’s Compliance 1. Stability Of The Company (a) Years Of Experience I. Has Been In The Business For At Least (3) Years; Ii. Has Experience In Providing Security Service (s) To Government Offices And Financial Institution; And, Iii. Bidders Shall Submit Certification Under Oath Of List Of Contracts Completed For The Past Three (3) Years. (b) Liquidity Of The Contractor Submit Audited Financial Statement For Cy 2020-2021 Duly Stamped By Bir Or Its Accredited And Authorized Institution. (c) Organizational Set-up Organizational Capability Of Any Agency Shall Be Based On Its Compliance With Organizational Structure Of Private Security Agencies Prescribed Under R.a. 5487 And Recent Irrs Implementing The Same. - Submission Of Organizational Chart Showing Key Management Personnel Are Themselves Term Of Reference: Security Agency For Cy 2025 Page 5 Of 9 Qualified And Licensed To Operate And Manage Security Business. - At Least (10%) Of Its Security Guard Force Are Currently Deployed On Important Posting Areas (e.g. Vital Installation, Airports, Power Plants, Banks And Similar Financial Institution And Government Offices). 2 Number Of Licensed Firearms - Agency Shall Have A Minimum Number Of Licensed And Serviceable Firearms (cal.38 Or 9mm For Handguns And/or 12 Gauge For Shotguns) Equivalent To 1/3 Of Their Total Number Of Security Guards; And, - Submit List Of Licensed Firearms 3 Other Factors (a) Recruitment And Selection Criteria - Show The Hiring Process For Security Guards And The Different Training Interventions Given To Security Personnel (b) Completeness Of Uniforms And Other Paraphernalia The Following Shall Comprise The Basic Equipment Of A Security Guard While On Duty: I. Prescribed Basic Uniform With Authorized Black Shoes Ii. Nightstick Or Baton Iii. Whistle Iv. Timepiece (synchronized To City Hall Time) V. Writing Pen Vi. Notebook And Duty Checklist (logbook Paginated And Smythe Sewn) Vii. List Of Emergency Numbers Viii. Flashlight Ix. First Aid Kit X. Service Firearms With Holster Xi. Handcuffs Xii. Communication Radio (optional) Xiii. Stun Devices (optional) Xiv. Raincoat/pontio Term Of Reference: Security Agency For Cy 2025 Page 6 Of 9 V. Other Responsibilities Of The Supplier/contractor A. The Supplier/contractor Shall Ensure That Their Assigned Security Guards To Btr Offices Are Physically And Mentally Fit For Duty During The Duration Of The Contract. Btr Reserves The Right To Require The Assigned Guards To Undergo Physical Fitness Test Before And During The Start Of The Contract. B. The Discipline And Administration Of The Security Guards Shall Conform To The Rules And Regulations Of The Contractor And The Btr. The Rules To Be Set By The Supplier/contractor Should Be Approved By Btr. C. The Supplier’s/contractor’s Personnel Rendering Unsatisfactory Performance, Questionable Actuations Or Behavior Including Repeated Violation Of Btr’s Internal Rules And Policies Shall Be Immediately Replaced Upon Receipt Of Written Memorandum From The Btr. On The Other Hand, The Supplier/contractor Shall Not Replace Security Guards To The Btr Without The Prior Approval From Its Management. D. The Supplier/contractor Shall Provide Its Security Personnel Stationed At The Client’s Offices With At Least (1) Unit License 9mm Handgun With Basic Ammunition Load Plus Extra Loaded Magazine; A Stand-by (1) Unit License 12 Gauge Shotgun To Be Issued Only During Extra-ordinary Situations, I.e., Like Existence Of Rebellion, Widespread Violence, Terroristic Attacks And Situations Calling For A More Heightened Alert. E. The Security Guards Of The Supplier/contractor Shall Never Be Employees Of The Btr. Hence, The Latter Shall Not Be Held Responsible For Any Claims For Compensation In The Event Of Injuries And Death Sustained By The Security Guards Or By Any Third Persons In The Performance By The Latter Of Its Duty With Btr. F. The Supplier’s/contractor’s Security Guards Shall Not Be Allowed To Stay In The Building Premises When On “off-duty”, Except During Times Of Emergency Situations. G. The Supplier/contractor Shall Require Its Security Guards Assigned To Their Respective Stations To Render Services In Accordance With The Contract And This Terms Of Reference. Security Guards Are Expected To Be On The Regional Office’ And Provincial Offices’ Premises At Least (30) Minutes Before The Start Of Duty. H. The Supplier/contractor Shall Prepare At Least Two (2) Relievers To Immediately Assume The Duty From Regular Guards In Case Of Their Absence. I. The Supplier/contractor Shall Require Its Security Guards To Render Services Exceeding The Scheduled Working Hours In The Exigencies Of The Service And/or As The Need May Arise. Absent Security Guards Shall Immediately Be Replaced By Relievers. Term Of Reference: Security Agency For Cy 2025 Page 7 Of 9 J. The Supplier/contractor Shall Assume Full Responsibility For Any Liabilities, Cause/s Of Action Or Claims Which May Be Filed By Any Of The Security Guards Under Labor Laws, Employees Compensation Laws Or Other Special Laws, Rules And Regulations Currently Mandated/implemented By The Department Of Labor And Employment. By Virtue Thereof, The Supplier/contractor Shall Render Btr, Its Officers And Employees, Free And Harmless From Any Such Liabilities, Cause Of Action Or Claims. K. The Supplier/contractor Shall Be Responsible For The Loss, Damage Or Injury That May Be Suffered By Btr Or Its Clients, Personnel And Properties, During The Tour Of Duty Of The Assigned Security Guards. Btr Shall Inform The Supplier/contractor In Writing Within Twenty Four (24) Hours From Its Occurrence Or Discovery. It Is Understood That The Contractor Shall Not Be Liable For Loss/es Or Damage/s Incurred By Btr Due To Fortuitous Events Or Force Majeure, Unless Accompanied By Negligent Acts By The Security Guards Or Their Failure To Take Positive Measures To Prevent Such Loss/es Or Damage/s In Line With Established Contractor And Btr Rules And Policies. Further, The Supplier/contractor Guarantees The Full Compensation For Whatever Loss/es Or Damage/s Which Btr May Sustain On The Occasion Of The Fault And Negligence Of Its Security Guards After Due Investigation Is Conducted On The Matter. L. The Supplier Or Contractor Is Obligated To Submit Proof Of Remittance In Compliance With Various Statutory Social Legislation Measures, Including But Not Limited To Contributions To Sss, Pag-ibig, Philhealth, And Ecc, Retirement Benefits For The Retirement Plan Established Or Remittance To Any Institution Responsible For The Administration And Maintenance Of Such Fund. The Supplier/contractor Shall Also Submit The Monthly Proof Of Payment Of The Basic Pay And Other Benefits Paid Directly To The Guards. This Documentation Must Be Provided To The Bureau Of The Treasury (btr) Within Fifteen (15) Days Following The Conclusion Of Each Month. Failure To Submit The Required Proof Of Remittance Shall Be A Ground For The Suspension Of Contract Payments Until Compliance Is Achieved. Additionally, Any Infringement Of These Standards Or Labor Laws May Result And Constitute As A Ground For The Blacklisting Of The Supplier Or Contractor. M. The Supplier/contractor Shall Comply With Existing Labor Standard Laws And Regulations, Especially In The Payment Of Minimum Wage And Other Statutory Benefits Implemented By Dole, Padpao, And The Pnp. N. In Addition, The Supplier/contractor Shall Submit To Btr The Following Upon Submission Of Their Rfq/proposal: 1. Certification Of Good Standing From The Pnp-sosia (formerly Pnp-sagds) And The Philippine Association Of Detective And Protective Agency Operators (padpao). 2. A Certified Copy Of The License To Operate As A Security Agency From The Pnp Term Of Reference: Security Agency For Cy 2025 Page 8 Of 9 3. Business Permit, Philgeps Certificate, Certificate Of Registration (bir), Tax Clearance, Itr (income Tax Return) O. The Supplier Shall Submit The Cost Distribution Schedule Of Security Services Following The Herein Format. Any Other Benefits May Be Added As Long As The Required Items Specifically Listed Below Are Adhered And Compliant With The Approved Budget Contract. Agency Estimate For Security Guards Factor Days 1st Shift 2nd Shift 393.4 414 414 Estimated Equivalent Monthry Rate = Eemr Payable Directly To Security Guards 1.1 Basic Salary Rate ( Monthly ) Sub- Total 1.2 Night Shift Differential ( Note :only 1 Hour Is Alloted For Night Shift Since Duty Is Only Until 11:00 Pm 1.3 13th Month Pay- 1/12 Of Basic Pay 1.4 Service Incentive Leave Pay - 5 Days Per Year (sil) 1.5 Uniform Allowance 1.6 Retirement Benefit Per Month (eemr * 22.5/12) Sub-total (a) Government Payment 1.7 Sss Premium Er Share (based On Table) 1.8 Sss Ec Er Share (based On Table) 1.9 Philhealth Er Share (5% Total, Shared 50:50 By Ee And Er) 1.10 Sif- Er Share 1.11 Pag_ibig Er Share Sub-total (b) Total Payment To Guards + Gov't ( C) 0.00 0.00 Admin Fee (d)= C * ___% 0.00 0.00 Vat- 12% Of Admin Fee (e )= D *12% 0.00 0.00 Total Vat And Admin Fee 0.00 0.00 Total Contract Cost- Monthly (f )= C + D + E 0.00 0.00 Annual Cost (f * 12 Months) 0.00 0.00 Total Annual Cost To Guards [1st Shift: (h * 4 Guards)] Ro + Zambo. City + Zambo. Del Norte + Basilan 0.00 Total Annual Cost To Guards 2nd Shift Of Regional Office Guard With Night Salary Differential 0.00 Term Of Reference: Security Agency For Cy 2025 Page 9 Of 9 Total First And Second Shift 0.00 Vi. Reservation Clause The Btr Reserves The Right To: Reject Documents That Do Not Comply With The Requirements; To Waive Any Formalities And Documents Or Consider Any Submission Of Documents As Substantial Compliance; To Reject Any And All Bids; To Declare A Failure Of Bidding; To Annul The Bidding Process; Or Not To Award The Contract, Without Thereby Incurring Any Liability To The Affected Potential Supplier Or Bidder/s. This Also Includes The Changes In The Funds/allotment Releases For The Said Program/project/activity Affecting The Award Of Contract, Which Are Either Withheld Or Reduced, At No Fault Of The Btr. The Btr Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidder/s Or Potential Supplier/s For Any Expenses Incurred In The Preparation Of The Bid/proposal. Prepared By: Cesar M. Canoog Jr. Administrative Assistant Ii Approved: Albert Jonathan B. Paulino Director Ii Conformed: _________________________________ Signature Over Printed Nam
Closing Date3 Jan 2025
Tender AmountPHP 916.9 K (USD 15.8 K)
Bureau Of Plant Industry Tender
Others
Philippines
Details: Description Rfq No. 0039 Pr No. 0070-25bac Request For Quotation For Goods And Services Section 53.9 Negotiated Procurement - Small Value Procurement Supply Of Labor Service And Materials For The Preventive Maintenance System Of Navarra Skw-592 Section I. Mandatory Requirements (note: Failure To Submit Any Of The Following Requirements Will Be Automatically Disqualified) A. Philgeps Registration (platinum Membership And Red Membership) Ü Mayor's / Business Permit Ü Income/business Tax Return (for Abc 500k And Above) Ü Certificate Of Bir Registration (for Abc 50k And Above) Ü Dti Registration Submit A Clear Copy Or Documentation Of The Proof Of Payment For The Renewal Of Expired Permit/s. B. Photocopy Of One (1) Company Id Or One (1) Valid Id W/ Three (3) Specimen Signature C. Notarized Original Omnibus Sworn Statement (for Abc 50k And Above) D. Professional License/curriculum Vitae (consulting Services) E. Menu List For Catering Services F. The Supplier Must Not Have Any Record Of Non-compliance Over The Past Three (3) Years. Section Ii. Instructions: 1. Please Write Legibly. 2. The Bidders/suppliers Or Their Authorized Representative Shall Accomplish This Form Including Unit Price And Total Price As Well As Sub- Total And Grand Total (if Applicable) And Affix Their Signature Over Printed Name Indicated In The Lower Portion Of This Form. 3. Indicate Offered Brands And Specifications (if Applicable). 4. Quotation(s)/proposal(s) Shall Be Submitted At The Procurement Management Section (bac Office), Bureau Of Plant Industry, 692 San Andres Street, Malate, Manila Or Through Courier Or Email (pms.rfq@buplant.da.gov.ph). 5. Only Sealed Canvass Submitted In Person Or Through Courier Shall Be Considered By The Bac. The Bidders/suppliers Shall Reflect On The Envelope The Rfq Number And The Pr No. The Bac Shall Not Be Responsible On The Pre-emptive/premature Opening Of The Proposal. 6. Any Insertions, Erasures, Or Overwriting Shall Be Valid If Only They Are Signed Or Initialed By The Bidders/suppliers Or Their Authorized Representative. 7. Quotation Must Include All Kinds Of Taxes For The Item(s)/services Listed Hereunder, Including Delivery Charges. 8. Price Quotation(s) Submitted Shall Be Valid For A Period Of One Hundred Twenty (120) Days Reckoned From The Deadline For Submission Of Quotations As Reflected In This Form. 9. Awarding Shall Be Done Per Lot. 10. Deadline For Submission Of Bids: January 21, 2025 (8:00am). 11. In Case Of Two Or More Bidders Are Determined To Have Submitted The Lowest Calculated And Responsive Quotation Or Highest Rated And Responsive Quotation For Consultancy Services, The Bpi- Bac Shall Employ The Rules Specified In The Irr Of Ra 9184. 12. Delivery/installation/completion Period: Fourteen (14) Calendar Days Upon Reciept Of Purchase Order (p.o.). 13. The Uniform Guidelines For Blacklisting Set Forth In Appendix 17 Of The 2016 Revised Irr Of Ra 9184 Shall Apply. 14. The Supplier/bidder/contractor Must Have No Violation With Its Transactions With The Bureau Based On Bpi Records And Bpi Memorandum Order 328 Series Of 2023. 15. The Bureau Of Plant Industry Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. "notice/announcement: Bureau Of Plant Industry Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. " Approved Budget For The Contract: Php 124,630.00 End User: Gss Qty Unit Item/description Ceiling Price/ Offered Unit Total Per Unit(php) Brand Price Price "preventive Maintenance System Navarra Skw-592 Service/parts Replacement" 2 Pcs Front Kyb Shock New 5,070.00 2 Pcs Rear Kyb Shock New 4,810.00 4 Pcs Upper Suspension Bushing 845.00 4 Pcs Suspension Arm Bushing Big 975.00 4 Pcs Upper Arm Bushing 975.00 4 Pcs Lower Arm Bushing 1,105.00 2 Pcs Stabilizer Link 1,690.00 2 Pcs Stabilizer Bar Bushing 390.00 2 Pcs Lower Ball Joint 1,560.00 2 Pcs Upper Ball Joint 1,430.00 1 Set Rack End 1,430.00 1 Set Tie Rod End 1,690.00 2 Pcs Stabilizer Clamp Bushing 715.00 1 Pc Steering Clamp Bushing 1,950.00 2 Pcs Big Leaf Spring Bushing 845.00 8 Pcs Leaf Spring Bushing 455.00 2 Pcs Cable Tie 65.00 2 Pcs Front Caliper Pin 325.00 1 Set Brake (shoe) 4,745.00 2 Pcs Wheel Bearing Front 4,940.00 1 Ltr Power Steering Fluid 585.00 4 Pcs Rack End Pinion Bushing 715.00 1 Pc Spiral Cable Ribbon 4,550.00 1 Pc Valve Cover Gasket 1,300.00 1 Set Injector Oil Seal 2,600.00 Labor 40,000.00 "place Of Delivery: Bpi Compound, San Andres St., Malate, Manila Proposed Delivery Period: 14 Calendar Days" Grand Total 124,630.00 Philgeps Posted Joan-may R. Tolentino Bac Chairperson Canvasser The Bpi-bids And Awards Committee (bac) 692 San Andres, Malate Manila In Connection With The Above Request, I/we Submit Our Quotation Indicated Above. I/we Have Carefully Read And Fully Understand The Minimum Requirements And Agree To Furnish And/ Or Deliver The Above Mentioned Requirement(s) In Conformity With The Specifications/terms Or Reference/scope Of Work Indicated/attached Thereto. ________________________________________ _________________________________ __________________ ________________________________________ Signature Over Printed Name Company Name Of Bidder Philgeps Registration Number ________________________________________ _________________________________ __________________ ________________________________________ Contact Number(s) Office Adress Email Address Of The Bidder ________________________________________ ________________________________________ Tax Identification Number (tin) Date Accomplished Payment Shall Be Made Through Land Bank's Lddap-ada/bank Transfer; Bank Transfer Fee Shall Be Charged Against The Creditor's Account. Payment Details: Banking Institution: ________________________________________________ Account Number:___________________________________________________ Account Name:______________________________________________________ Branch:_______________________________________________________________
Closing Date21 Jan 2025
Tender AmountPHP 124.6 K (USD 2.1 K)
City Government Iligan Tender
Civil And Construction...+1Building Construction
Philippines
Details: Description Invitation To Bid The Iligan City Government Bids And Awards Committee (bac), Through General Fund-20% / Dev. Fund, Intend To Apply The Sum Of P 1,622,577.91 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Improvement Of Brgy. Health Center, Temp. Room Extension - Iligan Health Center, Brgy. Del Carmen, Iligan City With Project No. Cb(b)-25-002 (ceo-infra). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Iligan City Government Bids And Awards Committee Now Invites For The Supply And Delivery Of Items Below-stated: Particulars Improvement Of Brgy. Health Center, Temp. Room Extension - Iligan Health Center, Brgy. Del Carmen, Iligan City General Requirements • Installation Of Project Billboard • Occupational Safety And Health Program • Mobilization And Demobilization Removal Of Structures And Obstruction • Remove And Replace Ceiling Board At Abtc And Roof Eaves • Demolish Chb Wall Partition At Utility Access And Female Toilet • Remove And Replace Doors And Jambs • Demolish Some Chb Wall Partition For Door Opening At Doffing Station Level 01 & 02 • Demolish Plant Box At Receiving Area For Stairs Earthworks • Excavation Work For Pedestal Footings • Gravel Bedding For Pedestal Footings • Backfilling Of Common Soil Using Excavated Soil Must Be Compacted Layer By Layer Concrete Work, Formwork & Scaffolding • Pedestal Column And Zocalo For Waiting Area And Receiving Area • Slab For Waiting Area And Receiving Area • Sputum Collection At Injection Area And Laboratory Steel Reinforcements • Pedestal Column And Zocalo For Waiting Area And Receiving Area • Slab For Waiting Area And Receiving Area • Masonry Wall Reinforcement • Sputum Collection At Injection Area And Laboratory Steel Works • Rectangular Tube 50 X 75 X 1.2mm For Purlins At Waiting Area And Receiving Area • Rectangular Tube 50 X 100 X 1.2mm For Rafter And Column At Waiting Area And Receiving Area Masonry & Plastering Works • 100mm Thk. Chb Wall Partition For Counseling Room • 100mm Thk. Chb Wall For Additional Pwd Toilet, Female Toilet And Sputum Collection Ceiling Works • Replace Ceiling Board At Tb Dots/ Is Dots With 4.5mm Thk. Fiber Cement Board • Replace Ceiling Board At Roof Eaves With Pvc Ceiling Panel Dry Wall Partition • Install Drywall Partition At: - File/ Stock Room & Medical Supplies Room - Examination/ Treatment Area - Arv & Supplies Storage Area - Consultation Room And Laboratory Roofing Works • Install 3mm Polycarbonate Solid Sheet For Roofing At Waiting Area And Receiving Area Tile Works • Installation Of 300mm X 300mm Ceramic Floor Tiles (non-skid) At Additional Pwd Toilet Floor And Female Toilet • Installation Of 300mm X 300mm Ceramic Wall Tiles (glossy) At Additional Cr Wall, Female Toilet And Sink Electrical Works • Remove Lighting And Wirings In The Two Rooms To Be Renovated • Installation Of Conduits ,junction Box ,utility Box • Installation Of New Electrical Wire ,switches , Aircon Outlet • Installation Of Lighting Fixture In Its New Location According The Electrical Plan (note Use The Old Lighting Fixture) • Lighting Circuits Must Be Connect In Circuit No. 1 And Circuit No. 5 As Refer To The Electrical Plan • Additional Aircon Outlet Installed Must Be Connected To Electrical Panelboard Spare Plumbing Works • Pipes (water, Waste And Soil) For Additional Pwd Toilet, Female Toilet And Sputum Collection • Replace P-trap In Every Sink • Installation Of Water Closet, Lavatory And Faucet • Install Of Grab Bar Ss 304 L 49 X W 7.5 X H 6 Cm, Grab Bar,vertical Wall Support 32mmø Ss304 Painting Works • Repaint Existing Interior Ceiling Board • New Paint For Ceiling Board At Abtc (tb Dots/ Is Dots) • New Paint For Interior Chb Wall Partition At Counseling Room And Additional Pwd And Female Toilet • Paint Steel Rafter, Purlins And Steel Columns • Seal Joints At Drywall And Ceiling Using Gypsum Putty Doors And Windows • W1- 2250mm X 1500mm Analok- Aluminum Framed, 6mm Thk. Fixed Glass Window • D1- 800mm X 2100mm Wooden Panel Door (kiln Dried) With 50 X 150 Mm Door Jamb And Complete Accessories • D2- 1300mm X 2100mm Double Swing Flush Door With Vision Glass ,50 X 150 Mm Door Jamb And Complete Accessories • D3- 1000mm X 2100mm Wooden Flush Door With Exhaust, 50 X 150 Mm Door Jamb And Complete Accessories • D4- 600mm X 2100mm Wooden Flush Door With Exhaust, 50 X 150 Mm Door Jamb And Complete Accessories • D5- 1?00mm X 2650mm Analok- Aluminum Framed,6mm Thk. Sliding Glass Door With Complete Accessories • D6- 1600mm X2650mm Accordion Door With Complete Accessories • Dw1- 2200mm X 2650mm Analok- Aluminum Framed, 6mm Thk. Swing Glass Door With Transom & Complete Accessories • Dw2- 2350mm X 2650mm Analok- Aluminum Framed, 6mm Thk. Swing Glass Door With Transom & Complete Accessories • Dw3- 2375mm X 2650mm Analok- Aluminum Framed, 6mm Thk. Swing Glass Door With Transom & Complete Accessories • Dw4- 4850mm X 2650mm Analok- Aluminum Framed,6mm Thk. Swing Glass Door With Transom & Complete Accessories I. General Requirements A. Project Billboard (q = 1.00 Lot) Includes 4' X 8' Tarpaulin, 8' X 8' Tarpaulin, Rx 3"x 14" Coco Lumber, 2"x 3"x10" Coco Lumber, 2"x 2" X8" Coco Lumber, Assorted Sizes C.w. Nails. B. Occupational Safety And Health Program (q = 1.00 Lot) Includes Safety Shoes, Safety Helmet, Safety Gloves, Specialized Ppe. C. Mobilization / Demobilization (q = 1.00 Lot) Ii. Removal Of Structures And Obstruction (q = 1.00 Lot) Includes Remove And Replace Ceiling Board At Abtc (new Tb Dots/is Dots) And Roof Eaves, Demolish Chb Wall Partition At Utility Access And Female Toilet, Remove And Replace Doors And Jambs, Demolish Some Chb Wall Partition For Door Opening At Doffing Station Level 01 & 02, Demolish Plant Box At Receiving Area For Stairs. Iii. Earthworks (q = 2.88 Cu.m.) Includes Volume To Be Excavated, Volume Of Gravel Bedding. Iv. Concrete Work, Formwork & Scaffolding (q = 3.45 Cu.m.) Includes Portland Cement, Washed Sand, Washed Gravel, Marine Plywood 12mm Thk. X 4' X 8', 2" X 3" X 8' Coco Lumber, 2" X 2" X 8' Coco Lumber, Assorted Sizes C.w. Nails. V. Steel Reinforcements (q = 312.42 Kgs.) Includes 10mm Ø Dsb X 6m, 12 Mm Ø Dsb X 6m, No. 16 G.i. Tie Wire. Vi. Steel Works (q = 299.56 Kgs.) Includes Rectangular Tube 50 X 75 X 1.2 X 6000 Mm, Rectangular Tube 50 X 100 X 1.2 X 6000 Mm, Welding Rod (6011), Baseplate 12mm X 8"x16", 1/2" X 4" Expansion Bolt, Stud Anchor M8x75mm, 4" Cutting Disk, 4" Grinding Disk. Vii. Masonry & Plastering Works (q = 43.27 Sq.m.) Includes 4" Chb 700psi, Portland Cement, Washed Sand,injectable Chemical Anchor. Viii. Doors And Windows (q = 37.00 Set) Includes Wl: 2250mm X 1500mm Analok- Aluminum Framed, 6mm Thk. Fixed Glass Window; Dl: 800mm X 2100mm Wooden Panel Door (kiln Dried) With 50 X 150 Mm Door Jamb And Complete Accessories; D2: 1200mm X 2100mm Double Swing Flush Door With Vision Glass , 50 X 150 Mm Door Jamb And Complete Accessories; D3: 900mm X 2100mm Wooden Flush Door With Exhaust, 50 X 150 Mm Door Jamb And Complete Accessories; D4: 600mm X 2100mm Wooden Flush Door With Exhaust, 50 X 150 Mm Door Jamb And Complete Accessories; Ds: 1700mm X 2650mm Analok- Aluminum Framed, 6mm Thk. Sliding Glass Door With Complete Accessories; D6: 1600mm X2650mm Accordion Door With Complete Accessories; D7: 900mm X2100mm Wooden Flush Door W/50 X 150 Mm Door Jamb And Ss Lick Plate With Complete Accessories; Dwl: 2200mm X 2650mm Analok- Aluminum Framed, 6mm Thk. Swing Glass Door With Transom & Complete Accessories; Dw2: 2350mm X 2650mm Analok- Aluminum Framed, 6mm Thk. Swing Glass Door With Transom & Complete Accessories; Dw3: 2375mm X 2650mm Analok- Aluminum Framed, 6mm Thk. Swing Glass Door With Transom & Complete Accessories; Dw4: 4850mm X 2650mm Analok- Aluminum Framed, 6mm Thk. Swing Glass Door With Transom & Complete Accessories; Ss Lever Type Lockset, Heavy Duty; Ss Knob Type Lockset, Heavy Duty. Ix. Painting Works (q = 372.77 Sq.m.) Includes Skim Coat (20kg/pack), Pennacoat Rat Latex, Masonry Putty, Red Oxide Primer, Quick Drying Enamel, Paint Thinner, Paint Roller 7" W/ Paint Tray, Paint Brush 2-1/2 ", Sand Paper (assorted Sizes), Tape Fiberglass Mesh (48mm X 30m), Gypsum Putty (5kg/gal). X. Ceiling Works (q = 177.65 Sq.m.) Includes 4.5mm Thk X 4" X 8" Ficem Board, Blind Rivets, 1000pcs/box; Riveter. Xi. Dry Wall Partition (q = 90.09 Sq.m.) Includes 4.5mm Thk X 4' X 8' Ficem Board; Metal Studs, 0.50mm Thk. X 2" X 3" X 2" X 3.00m; Metal Tracks, 0.50mm Thk. X 2" X 3" X 2" X 3.00m; Hardiflex Screw ( Rat Head) #7x 25mm (500 Pcs); Blind Rivets, 1000pcs/box. Xii.roofing Works ( Q = 27.05 Sq.m.) Includes 4' X 8' X 3mm Polycarbonate Solid Sheet, Analok Flat Bar 1/8" X 1" X 16ft, Tek Screw 12 X 65mm (100pcs). Xiii.tile Works (q = 27.71 Sq.m.) Includes 300mm X 300mm Ceramic Floor Tiles (non-skid), 300mm X 300mm Ceramic Wall Tiles, Tile Grout (2kg), Tile Adhessive 25kg (heavy Duty), Portland Cement, Washed Sand, Diamond Cutter Wheel. Xiv. Electrical Works ( Q = 1.00 Lot) Includes Led Panel Light 20w 30x30cm Daylight Recessed Type 230vac; Single Gang Switch 230v; Three Gang Switch 230v; T8 Led Tube Light,18w,43x1220x31mm,g13,single Ended W/ Fixture; Junction Box; Utility Box; Aircon Outlet 20a 230vac; 3.smm2 Thwn-2 Stranded Copper Wire; 8.0mm 2 Thwn-2 Stranded Copper Wire; Electrical Pvc 20mm Schedule 40; Electrical Tape 0.16mmx19mmx16m; Circuit Breaker 50at Bolt On 10kaic. Xv.plumbing Works (q = 1.00 Lot) Includes Stainless Steel Lavatory Faucet, Heavy Duty; Two Piece Water Closet, 705x400x775mm; Lavatory , 500x655x835mm; Stainless Sink, Heavy Duty; Grab Bar Ss 304 L 49 X W 7.5 X H 6 Cm; Grab Bar Vertical Wall Support 32mm0 Ss304; Floor Drain 100x150xx2.7mm; 4" Dia. Pvc Wye; 4" Dia. Pvc Coupling; 4" Dia. Pvc Clean Out; 4" Dia. Pvc Elbow, 1/8 Bend; 4" Dia. X 10' Pvc Pipe, S-1000; 2" Dia. Pvc P-trap; 2" Dia. Pvc Wye; 2" Dia. Pvc Elbow, 1/8 Bend; 2" Dia. Pvc Elbow, 1/4 Bend; 2" Dia. X 10' Pvc Pipe, S-1000; 3 Way Angle Valve; Pvc Cement, 400cc; 1/2" Dia. G.i. Elbow; 1/2" Dia. G.i.tee; 1/2" Dia. G.i. Coupling; 1/ 2" Dia. X 20' G.i. Pipe; Teflon Tape (big). Approved Budget For The Contract (abc): P 1,622,577.91 Required Bid Security: 2% Of The Abc If Cash, Manager’s Check; Bank Draft/guarantee, Irrevocable Letter Of Credit Confirmed Or Authenticated By A Universal Or Commercial Bank; And 5% Of The Abc If Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security Delivery Period Is Within Ninety (90) Calendar Days From Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Three (3) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. Interested Bidders May Obtain Further Information From Iligan City Government And Inspect The Bidding Documents During Office Hours From 8:00 A.m. – 12:00 P.m. And 1:00 P.m. – 5:00 P.m. At The Bac Office, Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule 1. Issuance Of Bid Documents: January 7 – January 28, 2025 – 8:00 A.m. At Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. 2. Pre-bid Conference: January 14, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 3. Submission Of Bids: January 28, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 4 . Opening Of Bids: January 28, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City A Complete Set Of Bidding Documents Will Be Available To Prospective Bidders Upon Payment Of A Non-refundable Amount Of P 5,000.00 To The Iligan City Government Cashier, At The Bac Office, Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City.the Iligan City Government Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Furthermore, The City Government Of Iligan Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Or Loss Incurred In The Preparation And Submission Of The Eligibility Statements And Bids. Approved By: (signed)darwin J. Manubag, Phd. Bac Chairman Date Of Advertisement/posting: January 7, 2025 Place Of Posting/advertisement: City Hall/ibjt Bulletin Boards, Iligan Official Website, Phil-geps Itb No. 25-002 (ceo-infra)
Closing Date28 Jan 2025
Tender AmountPHP 1.6 Million (USD 27.6 K)
Municipality Of Sta Rita, Western Samar Tender
Machinery and Tools...+1Automobiles and Auto Parts
Philippines
Details: Description Republic Of The Philippines Province Of Samar Municipality Of Sta. Rita The Municipality Of Sta. Rita, Through Lgu Fund Of 2025 Intends To Apply The Sum Of Five Million Pesos Only (php5,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Procurement Of Hydraulic Excavator. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Municipality Of Sta. Rita Now Invites Sealed Bids From Eligible Bidders For Procurement Of Hydraulic Excavator. Delivery Of The Goods Is Required On January - February 2025. The Description Of An Eligible Bidder Is Contained In Section Ii Of The Bidding Documents, Itb. Vehicle Description: Engine: Engine Model Qsf3.8, Emission Level Euroiii And National Iii, Automatic Preheating, Oil-water Separator W/ Water Level Indication Sensor, Radial Seal Air Cleaner, 50 Deg. Celcius High Temp. Ambient Cooling Assembly, Radiator Dust Screen, Fuel Marker, Fuel Breather Valve, Automatic Idle Speed, Rated Power=93/2220 Kw/rpm, Displacement=3.8l Hydraulic System: Boom/arm Flow Regeneration, Auxiliary Hydraulic Valve, Reverse Rotation Damping Valve, Automatic Rotation Parking Brake, Hydraulic Buffer Valve, Straight Hydraulic Circuit, Boom Priority Valve, Rotary Logic Valve, Hydraulic Oil Iso Vg 46, Rotary Anti-sway Valve, Spare Valve Plate, Gauge Pressure Monitoring, Rated Flow Of Main Pump=2x123.5 L/min, Main Safety Valve Pressure = 34.3mpa, Travel System Pressure = 34.4mpa, Swing System Pressure = 25mpa, Pilot System Pressure =3.9mpa Cab And Interior Trim: Pressurized Cab, Fully Adjustable Mechanical Suspension Seat, Adjustable Seat Armrest, Seat Belt 51mm Length 2inches Wide, Openable Windscreen W/ Auxiliary Device, Front Windshield And Other Toughened Windows, Sliding Door Upper Window, Bi-directional Air Outlet Air Conditioner W/ Defroster Automatic Type, Color Liquid Crystal Display Capable Of Displaying Warning Information Filter /liquid Replacement Information And Working Hours, Control Handle, Travel Control Pedal With Detachable Manual Control Lever, Two Stereo Speakers, Beverage Cup Holder, Coat And Hat Hook, Cleanable Floor Mat, Air Conditioning System, High And Low Gears Shift, One-key Boost Mode, Reverse Switch For Working Aids, Top Sunroof, Intermittent Multi-gear Wiper, Cup Holder/envelope, Cold And Warm Storage Box, Radio Receiver Safety And Security Configuration: Driving Door Locks And Cabin Locks, Alarm Horn, Isolation Plate Between Engine And Oil Pump Chamber, Engine Emergency Stop Switch, Rear Window Emergency Exit, Battery Circuit Breaker, Boom And Arm Retaining Valve, Explosion Proof Valve For Boom Pipeline, Overheat Alarm, Safety Handrails And Pedals, Anti Skid Plate/anti Skid Paste, Hydraulic Safety Locking Lever, Emergency Escape Hammer, Left And Right Rearview Mirrors, Counterweight Rearview Mirror Chasis System And Shield: Bottom Frame Traction Ring, 600mm Three Rib Track Shoe, Guid Wheel And Middle Track Single Track Protector, Protective Device Kit Chasis Bottom Sealing Plate Walking, Motor Sealing Plate, Grease Lubricated Track Working Device: Boom 4.6m, Arm 2.52m, Bucket 0.65cu.m. Strengthened Bucket Electrical System: Battery (2x750cca), 70a Alternator, 4.8kw Starter Motor, 24v Cigarette Lighter, 5v Usb Interface Lighting Lamp: Right And Left Boom Work Lights, Right Working Light Installed On Storage Box, Cab Interior Lighting Counter Weight: 3.95t Counterweight Oil Capacity: Fuel Tank =260l, Hydraulic Tank Capacity =105l, Engine Oil Capacity =11l Standard: Length Of Boom =4600mm, Length Of Arm =2520mm, Bucket Capacity =0.65cu.m. Main Performance: Travel Speed =5.3/3.2 Km/h, Swing Speed =11.7 R/min, Gradeability = Lessthan Equal To 35 Deg., Groud Pressure =37kpa, Bucket Digging Force =106.9kn, Arm Digging Force =73.4kn, Maximum Tractive Force =134kn Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criteria As Specified In The Implementing Rules And Regulations Part A (irr-a) Of Republic Act No. 9184 (r.a. 9184), Otherwise Known As The Government Procurement Reform Act, And Is Restricted To Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, As Specified In Republic Act 5183 (r.a. 5183). Only Bids From Bidders Who Pass The Eligibility Check Will Be Opened. The Process For The Eligibility Check Is Described In Section Ii Of The Bidding Documents, Itb. The Bidder With The Lowest Calculated Bid (lcb) Shall Advance To The Post-qualification Stage In Order To Finally Determine His Responsiveness To The Technical And Financial Requirements Of The Project. The Contract Shall Then Be A Awarded To The Lowest Calculated And Responsive Bidder (lcrb) Who Was Determined As Such During The Post-qualification Procedure. Interested Bidders May Obtain Further Information From Municipality Of Sta. Rita And Inspect The Bidding Documents At The Address Given Below From Monday To Friday At 8:00 Am To 5:00 Pm A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee In The Amount Of Ten Thousand Pesos (php10,000.00) Only. The Method Of Payment Will Be On Cash Basis. The Bidding Documents Shall Be Received Personally By The Prospective Bidder Or His Authorized Representative. Bids And Eligibility Requirements Must Be Delivered To The Address Below On Or Before January 7, 2025. All Bids Must Be Accompanied By A Bid Security In The Form Of Surety Bond And In The Amount Of 5% Of Abc Or An Equivalent Amount In A Freely Convertible Currency. Late Bids Shall Not Be Accepted. Bid Opening Shall Be Held At The Bac Office, Municipality Of Sta. Rita On January 7, 2025 @ 10:00 Am. Bids Will Be Opened In The Presence Of The Bidders Or His Representatives Who Choose To Attend At The Address Above. The Municipality Of Sta. Rita Reserves The Right To Accept Or Reject Any Bid, And To Annul The Bidding Process And Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Approved: Engr. Ruel T. Duallo Bac Chairman
Closing Date7 Jan 2025
Tender AmountPHP 5 Million (USD 86.1 K)
1041-1050 of 1060 archived Tenders