Shoes Tenders

Shoes Tenders

Don Emilio Del Valle Memorial Hospital Tender

Food Products
Philippines
Details: Description Subject : Design And Build Of Dedvmh Nutrition And Dietetics Service Facilities Location : Dedvmh Compound, Bood, Ubay, Bohol Terms Of Reference I. Background Don Emilio Del Valle Memorial Hospital (dedvmh) Is A Licensed Level 2 General Hospital Located In Ubay, Bohol With 200 Authorized Bed Capacity Which Aims To Provide Highly Specialized Quality Healthcare Services To All Where Human Dignity Is Valued And Respected By Competent And Committed Personnel. In Accordance With The Provisions Of And Related Issuances Of Doh Administrative Order No. 2019-0056 Increasing The Bed Capacity Of Dedvmh From 50 Beds To 300 Beds And R.a. No. 11223, Or The “universal Health Care Act”, The Hospital Shall Provide Promotive, Preventive, Diagnostic, Curative, And Palliative Care Services, And Research, Professional Teaching And Training Programs And Shall Be Fully Equipped With The State-of-the Art Equipment And Facilities, Complemented By Adequately Trained And Competent Human Resources For Health Appropriate For A Licensed And Accredited Tertiary General Hospital. Dedvmh Shall Strengthen Its Existing Basic Services, And Aim For The Improvement Of Its Service Capability And Capacity Serving As Referral Hospital In The Northeastern Section Of The Bohol Province, Complementing Local Health Systems And Providers Of Municipalities In The Area. In Order To Fulfill This Mandate, Dedvmh Is Upgrading Its Services To Become A Level Iii Hospital To Provide Better And Quality Healthcare Services Especially In The Northeastern Part Of Bohol, Its Catchment Areas And Nearby Provinces. The Increase In The Bed Capacity And Expansion Of Services And Capability Are Consistent With The Dedvmh’s Hospital Development Plan (hdp) And Philippine Health Facility Development Plan (phfdp) 2020-2040. Ii. Objectives As Food Preparation Is Part Of The Critical Functions In Delivering Quality Healthcare Service, It Is Important That Its Site Be Given Adequate Repair And Renovation. The Objective Is To Repair And Expand The Existing Dietary Area Resulting To A More Spacious, Comfortable And Hygienic Station For Its End-users To Work Around. The Improvement Is Expected To Evoke A Less Stressful Environment And Increased Productivity Among Workers. The Design Must Also Conform To The Standards Of Set By In Accordance To The Manual On Technical Guidelines For Hospitals Planning And Design (level 3) And Doh Green And Safe Health Facilities Manual To Develop Climate Smart Health Facilities That Address And Adapt To The Impacts On The Environment. The Winning Bidder Shall Design For This Project With The Approval Of The Medical Center Including The Approved Detailed Estimates, Bill Of Quantities, Technical Specifications, And Methodology Of Construction And Scope Of Works Of The Project. Iii. Conceptual Design The Design Concept Of The Project Was Governed By The Planning And Design Standards Of Level 3 Service Capability Hospital Facility As Prescribed By The Latest Requirements Of The Department Of Health And Other Concerned Agencies. Building Design Shall Conform To The Provisions Of The National Building Code Of The Philippines (pd 1096), Accessibility Law (bp 344), Architecture Law (ra 9266), National Structural Code Of The Philippines, Electrical Engineering Law (ra 7920), Mechanical Engineering Law (ra 5336), Plumbing Code (ra 1378, 1993-1994 Revisions), Fire Code (ra 9514) And Other Laws And Regulations Covering Environmental Concerns And Local Ordinances And Regulations. The As-built Plan And Proposed Schematic Lay-out/call-out Will Be Provided As Basis Reference In The Development Of Preliminary Conceptual Design Plans To Be Submitted As Part Of The Technical Proposal. However, It Is The Responsibility Of The Bidder To Verify Actual Site Conditions And Dimensions. The Preliminary Conceptual Design Plans And Perspectives Shall Be Included Construed Part Of The Technical Proposal As Follows: Preliminary Conceptual Design Plans Required Specified Degree Of Details 1. Schematic Floor Plans: A. Ground Floor All Schematic Plans Shall Be At Least A3 Size Paper And Shall Meet The Minimum Space Requirements And Planning/design Guidelines Of Level 3 Hospital For: - Existing Dietary Complex Expansion And Improvement - Into Nutrition And Dietetics Service Facilities Preliminary Conceptual Design Plans Required Specified Degree Of Details A. Aerial Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. B. Man’s Eye / Worm’s Eye Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. C. Front Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. D. Rear Perspective View In Conformance With The Preliminary Conceptual Plans And At Least 3d Rendered. E. Left & Right-side Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered F. Longitudinal And Transverse Section Plans At Least One Longitudinal And One Transverse Section Plans In At Least A3 Size Paper The Conceptualization Of The Design Including Its Specifications And Space Requirements Shall Complement And/or Supplement With The Existing Site Conditions And Specification Of The Existing Dietary Area At Ground Floor. Proponent’s Input, Suggestion And Recommendations With Regard To The Identification Of The Scope Or Physical Components And Structures, Specific Outputs And Requirements And Proposed Construction Methods Shall Be Considered. Iv. Performance Specifications And Parameters Site And Space Planning Were Governed By The Standards, Rules And Regulations On The Design Of Level 3 Hospitals As Prescribed By The Department Of Health And Other Concerned Agencies. Building Design Shall Conform To The Provisions Of The National Building Code Of The Philippines (pd 1096), Accessibility Law (bp 344), Architectural Law (ra 9266), Civil Engineering Law (ra 544), National Structural Code Of The Philippines, Electrical Engineering Law (ra 7920), Mechanical Engineering Law (ra5336), Plumbing Code (ra 1378, 1993-1994 Revisions), Fire Code (ra 9514) And Other Laws And Regulations Covering Environmental Concerns And Local Ordinances And Regulations. A. Pre-detailed Design 1. Engineering Surveys And Investigations 1.1 Surveys And Investigations Of The Site Includes Elevations And Contours (at 0.5m Interval), Soil Tests, Location, Dimension, Floor Elevations And Other Pertinent Data On Existing Buildings And Improvements (roads, Parking Areas, Mature Trees) And Existing Utility Lines (e.g. Water, Power, Telephone). 2. Preliminary Conceptual Design Plans/perspective 2.1 Preparation Of The Following Drawings For Design Development Based On The As Built Plan And Schematic Lay-out/call-out Prepared By The Procuring Entity. Please Refer To Section Iii. Conceptual Design. B. Detailed Design Preparation Of Final Design Concept And Detailed Architecture And Engineering Design Shall Be In Accordance With The Schematic Plans For Hospital Building And Design Conceptualization Duly Approved By The Dedvmh. In Determining The Final Design Concept And Detailed Architecture And Engineering Design, The Implementing Unit Together With The Design And Build Contractor Shall Initiate The Coordination Meeting With The Concerned Stakeholders In The Following Schedule: First Session - The Design And Build Contractor Shall Present The First Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents Within Ten (10) Calendar Days From The Effectivity Of Notice To Proceed Second Session - The Design And Build Contractor Shall Present The First Revision Of Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents, If There Any, Within Twenty (20) Calendar Days From The Effectivity Of Notice To Proceed Third Session - The Design And Build Contractor Shall Present The Second Revision Of Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents, If There Any, Within Thirty (30) Calendar Days From The Effectivity Of Notice To Proceed Upon Approval Of The Final Schematic Plan And Design Concept, The Design And Build Contractor Shall Then Proceed For The Design Phase, Enumerated As Follows: 1. Preparation Of The Following Detailed Design Drawings Of Entire Building (see Doh Checklist Of Drawings Requirements) Based On The Design Development Drawings And Design Parameters Including Any Revisions And Refinements As Approved And Required By The Dedvmh: A. Detailed Architectural Plans (refer To Checklist Of Drawings Requirements And Design Parameters). B. Detailed Structural Plans (refer To Checklist Of Drawings Requirements And Design Parameters). C. Detailed Electrical Plans (refer To Checklist Of Drawings Requirements And Design Parameters). D. Detailed Storm Drain, Sanitary And Plumbing Plans (refer To Checklist Of Drawings Requirements And Design Parameters). E. Detailed Mechanical Plans (refer To Checklist Of Drawings Requirements And Design Parameters). F. Structural Computations, Including Soil Boring Test Results And Seismic Analysis And Electrical Design Computations. G. General Notes And Technical Specifications Describing Type And Quality Of Materials And Equipment To Be Used, Manner Of Construction And The General Conditions Under Which The Project Is To Be Constructed. H. Detailed Cost Estimates, Detailed Bill Of Qualities, Bill Of Quantities, And Program Of Works Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals. I. Summary Of Works J. All Design Output Shall Include The Following: Particulars Design Required Output Hard Copy Printed In Standard Size Paper 40 X 30 Printed And Hardbound Catalog For All Perspective Views, Architectural Finishes, Electrical Fixtures, Sanitary/plumbing Fixtures Utilizing Standard A4 Size Photo Paper Electronic Copy Electronic Copies In Standard Formats: - Designplansfile.pdf; - Designplanscadfile.dwg; - Design3dfile.skp/dwg/etc; - Powerpointpresentation.ppt; - 3d Animations (walkthrough.mp4/avi/mov/etc.) Design And Build Contractor Shall Compile All The Files And To Be Stored In 1tb External Drive Fourth And Final Session - The Design And Build Contractor Shall Submit The Completed Detailed Design Drawings Of The Entire Building, Within Sixty (60) Calendar Days From The Effectivity Of Notice To Proceed. C. Green Building 1. Design Development Shall Consider At Least Basic Requirements For Green Building Applied To Hospital Facilities In Building Component Systems Such As Architectural, Structural, Electrical, Mechanical, And Sanitary. D. 3d Animation And Walkthrough Presentations Designer Shall Prepare A 3d Walkthrough, That Is, Taking A Virtual Tour Of The Proposed Project/structure In Any Design Platform. It Shall Be Produced From Digital 3d Models That Have Been Visualized To A Photo-realistic Standard That Will Showcase All The Design Elements, Both Externally And Internally Of A Property Development And Its Spaces. Minimum Expected Output Shall Include But Not Limited To: - 3d Walkthrough Presentation That Will Show From The Main Entrance Of The Hospital Compound, Going Through The Site Where The Project Is To Be Located. From The Site, It Should Walk Through The Main Facade And Entrance Of The Ground Floor Of The Building Up To The Third Floor Showing All The Respective Floors, Its Lobbies, Hallways, Rooms And Other Support Facilities. - In Addition, The 3d Walkthrough Presentation Shall Include The Exterior Views / Facade Of The Building With Its Adjoining Structures. E. Pre-construction Pre-construction Meeting Shall Be Scheduled On The Next Day That The Completed Detailed Design Drawings Are Submitted. Key Stakeholders—including The Dedvmh, And The Design And Build Contractor (architects, Engineers, Consultants, And Contractor—must Attend). The Meeting Will Serve To:  Review And Confirm The Submitted Design Documents.  Ensure That The Designs Comply With The Project’s Specifications, Budget, And Schedule.  Address Any Necessary Adjustments Or Clarifications Before Construction Commences. After The Pre-construction Meeting, The Design And Build Contractor Shall Finalize And Submit The Following Documents For The Approval Of Dedvmh: 1. Duly Signed Construction Schedule And S-curve 2. Duly Signed Manpower Schedule 3. Duly Signed Construction Methods 4. Duly Signed Pert Cpm And Ghannt Chart Showing Per Item Of Works Of Individual Projects 5. Log Book This Submission Should Encompass All Architectural, Structural, And Mepfs Plans, Specifications, And Any Amendments From The Meeting. These Documents Will Form The Basis For Construction. Upon The Dedvmh’s Approval Of The Submitted Construction Documents, A Notice To Commence Will Be Issued. Construction Activities May Only Begin Following The Issuance Of This Notice. F. Construction As A Rule, Contract Implementation Guidelines For Procurement Of Infrastructure Projects Shall Comply With Annex “e” And Guidelines For The Implementation Of Contracts For Design And Build Infrastructure Projects Shall Comply With Annex “g” Of Irr, Ra 9184. The Following Provisions Shall Supplement These Procedures: 1. Scope Of Works: Supply Of Materials, Labor, Tools And Equipment Necessary To Complete The Execution Of Architectural, Structural And Electrical And Mechanical Works. Includes All Other Necessary Works That Complete For The Fully Operational Building But Limited To The Following Work Items; A) Site Works - Provision Of Temporary Perimeter Fence - Demolition Of Existing Building/structure, Includes Hauling Of Debris Within The Hospital Compound - All Materials, Debris, Etc. Identified As Garbage As Directed By Hospital Management Shall Be Disposed Off-site - Excavation And Grading Provide Necessary Soil Protection On Excavated Portion. - Soil Poisoning And Termite Control B) Foundation Works - Foundation Of The Entire Building Includes Column Footings, Wall Footings And Other Sub-structures As Specified In The Approved Plan. C) Concrete Works - From New Foundation; Includes Slabs, Beams And Girders D) Architectural Works I) Exterior Walls – All Exterior Wall At Ground Floor Ii) Interior Walls – All Interior Wall At Functional Floors Complete With Wall Finishes Iii) Ceiling Works – All Functional Floors As Determined By Procuring Entity Iv) Floor Finish – All Functional Floors As Determined By Procuring Entity V) Doors And Windows– All Exterior Doors And Windows As Per Plan And Specifications Vi) Doors And Windows – All Functional Areas As Determined By Procuring Entity Vii) Painting Works – All Exterior Walls; Interior Walls At Functional Areas Viii) Façade And Signage E) Electrical Works I) Roughing-ins – All Necessary Roughing-ins Including Riser Conduits Including Ii) Cable Tray Iii) Panel Boards And Breakers – Main Breaker; Panel Boards From Ground Floor To Third Floor Iv) Wires And Cables – All Wires And Cables At Functional Floors Includes Installation Of Main Feeder Lines Tap To Existing Power House Including Connections To All Panel Board And Breakers V) Electrical Fixtures And Devices – All Fixtures And Wiring Devices At Functional Areas. Provision Of Usb Ready Outlets To Every Rooms. Vi) Application Of Electrical Connections/permits Shall Be Shouldered By The Contractor F) Mechanical Works I) Installation Of Automatic Fire Protection System At Functional Areas Ii) Installation Air Condition Units At Functional Areas As Determined By Professional Mechanical Engineer G) Plumbing And Sanitary Works I) Installation Of Plumbing And Sanitary System At Functional Areas, Includes; - Water Supply Pipelines - Waste Water Pipelines - Plumbing Fixtures And Accessories - Necessary Riser Pipes - Fiber Glass Pressure Tank - Provision Of Water Softener I) Electronics / Auxiliary Works - At Functional Areas: Public Address / Voice Evacuation Systems (paging Systems), Cctv, And Or Integrated Information And Communication Systems, Installation Of Fire Detection And Alarm System (fdas) At Functional Floors J) Other Works - At Dietary: Lpg Pipelines 1. No Works Shall Commence Unless The Contractor Has Submitted The Prescribed Documentary Requirements And The Dedvmh Has Given Written Approval. Work Execution Shall Be In Accordance With Reviewed And Approved Documents. The Contractor Shall Process The Approval Of Permit To Construct (ptc) Form Doh – Central Visayas Regional Office, Cebu City. In Addition To, The Contractor Shall Process The All-necessary Permits (i.e., Building Permit, Occupancy Permit And All Prerequisite Permits) Chargeable Against The Project. 2. The Contractor Shall Be Responsible For Obtaining All Necessary Information As To Risks, Contingencies And Other Circumstances Which May Affect The Works And Shall Prepare And Submit All Necessary Documents Specified By The Concerned Building Officials To Meet All Regulatory Approvals As Specified In The Contract Documents. 3. Any Errors, Omissions, Inconsistencies, Inadequacies Or Failure Submitted By The Contractor That Do Not Comply With The Requirements Shall Be Rectified, Resubmitted And Reviewed At The Contractor’s Cost. If The Contractor Wishes To Modify And Design Or Document Which Has Been Previously Submitted, Reviewed And Approved, The Contractor Shall Notify The Hospital Management And The Procuring Entity Within A Reasonable Period Of Time And Shall Shoulder The Cost Of Such Changes. 4. As A Rule, Changes In Design And Construction Requirements Shall Be Limited Only To Those That Have Not Been Anticipated In The Contract Documents Prior To Contract Signing And Approval. The Following Guidelines Shall Govern Approval For Change Or Variation Orders: A. Change Orders Resulting From Design Errors, Omissions Or Non-conformance With The Performance Specifications And Parameters And The Contract Documents By The Contractor Shall Be Implemented By The Contractor At No Additional Cost To The Procuring Entity. B. Provided That The Contractor Suffers Delay And/or Incurs Costs Due To Changes Or Errors In The Dedvmh Performance Specifications And Parameters, The Contractor Shall Be Entitled To Either One Of The Following: 1. An Extension Of Time For Any Such Delays Under Section 10 Of Annex “e” Of Irr (ra 9184); Or 2. Payment For Such Costs As Specified In The Contract Documents, Provided, That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. C. The Contract Documents Shall Include The Manner And Schedule Of Payment Specifying The Estimated Contract Amount And Installments In Which The Contract Will Be Paid. D. The Contractor Shall Be Entitled To Advance Payment Subject To The Provisions Of Section 4 Of Annex “e”, Irr (ra 9184). B. The Dedvmh Shall Define The Quality Control Procedures For The Design And Construction In Accordance With The Doh Guidelines And Shall Issue The Proper Certificates Of Acceptance For Sections Of The Works Or Whole Of The Works As Provided For In The Contract Documents. C. The Contractor Shall Provide All Necessary Equipment, Personnel, Instruments, Documents And Others To Carry Out Specified Tests. D. This Design And Build Projects Shall Have A Minimum Defects Liability Period Of One (1) Year After Contract Completion Or As Provided For In The Contract Documents. This Is Without Prejudice To The Liabilities Imposed Upon The Engineer/architect Who Drew Up The Plans And Specification For Building Sanctioned Under Section 1723 Of The New Civil Code Of The Philippines. E. The Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Of 15 Years For Permanent Structures/buildings As Specified In Section 62.2.3.2 Of The Irr (ra 9184) V. Implementation Arrangement A. Reporting Protocol Contact Person I. Nelson A. Elle, Md, Dtmph, Mscih Office Of The Medical Center Chief Ii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Ii. Joan V. Kadusale, Cpa Supervising Administrative Officer Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Iii. Leomel R. Labitad, Ce Engineer Iii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Iv. Allana Jane C. Dacoylo, Uap Architect Ii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Vi. Elegibility Requirements A. Basic 1. The Eligibility Requirements For Design And Build Scheme Shall Comply With The Applicable Provisions Of Sections 23-24 Of Irr Of Ra 9184. 2. A Modified Set Of Requirements Integrating Eligibility Documents And Criteria For Infrastructure Project And Consulting Services Shall Be Adopted In Accordance With Annex G - Guidelines For The Procurement And Implementation Of Contracts For Design And Build Infrastructure Projects Of Irr Of Ra 9184. 3. Pcab Classification Under “general Building”; License Category B “medium A” 4. Contractor Must Have Similar Project In The Amount At Least Fifty Percent (50%) Of The Abc Within The Past Five (5) Years. 5. Similar Projects With The Following But Not Limited To:  Low-rise Hospital Facility Project, Must Have Ongoing Or Completed Project At Least 2-storey Building.  Supply And Installation Of Hvac System. B. Specialized 1. For Pre-design And Design Phase Of The Contract, The Bidder Shall Comply The Following Professionals To Be Assigned: I. Project Coordinator • Licensed Architect Or Engineer With At Least 10 Years’ Experience In Hospital-related Project Management. • Superb Oral And Written Communication Skills, Organization Skills And Excellent Administrative Abilities. Ii. Architect • The Architect Must Be A Registered And Licensed Architects (rla), With An Updated Professional Identification Card And Must Be A Member In Good Standing Of The Integrated And Accredited Professional Organization Of Architects (iapoa). • Should Have At Least 5 Years’ Experience In Hospital-related Project. Iii. Structural Engineer • Licensed Structural Engineer With At Least 5 Years’ Experience In Hospital-related Project Management. • Must Be A Member Of Accredited Structural Engineer Associations. Iv. Mechanical Engineer • Licensed Professional Mechanical Engineer With At Least 5 Years’ Experience In Hospital-related Project. V. Electrical Engineer • Licensed Professional Electrical Engineer With At Least 5 Years’ Experience In Hospital-related Project. Vi. Sanitary Engineer • Licensed Sanitary Engineer With At Least 5 Years’ Experience In Hospital-related Project. Vii. Cad Operator (at Least One For Architecture And One For Each Engineering Specialty) • At Least Bachelor’s Degree In Architecture, Engineering, And/or Industrial Technology Major In Drafting • Proficient In Autocad Software Viii. Administrative Support Staff 2. For The Construction Phase Of The Contract, The Contractor Shall Assign Technical Personnel With The Following Qualification: I. Project Manager • Licensed Architect Or Engineer With At Least 10 Years’ Experience In Medium Rise Hospital-related Project • Superb Oral And Written Communication Skills, Organization Skills And Excellent Administrative Abilities. Ii. Project Engineer (civil) • Licensed Civil Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project Iii. Project Engineer (mechanical) • Registered Mechanical Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project Iv. Project Engineer (electrical) • Registered Electrical Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project V. Cad Operator (at Least One For Architecture And One For Each Engineering Specialty) • At Least Bachelor’s Degree In Architecture, Engineering, And/or Industrial Technology Major In Drafting • Proficient In Autocad Software Vi. General Foreman (all Discipline) • With At Least 5 Years’ Experience As General Foreman In Medium Rise Project Vii. Skilled Workers (all Discipline) • With At Least 3 Years’ Experience In Medium Rise Project Viii. Administrative Support Staff Vii. Approved Budget Cost Project Description Approved Budget Cost Design Of Dedvmh Nutrition And Dietetics Service Facilities 5%-6% Of Abc Construction Of Dedvmh Nutrition And Dietetics Service Facilities 94%-95% Of Abc Total Abc Php 15,000,000.00 The Approved Budget For The Design-build Contract Is Fifteen Million Pesos (php 15,000,000.00) Which Is Identified As The Design And Build Of Don Emilio Del Valle Memorial Hospital Nutrition And Dietetics Service Facilities. Detailed Architectural And Engineering Design Services Shall Not Seven Percent (7%) Of The Approved Budget Cost (as Per Prboa Resolution No. 6 Series Of 2016 - Architect’s Guidelines For Standards Of Professional Practice Compliances On The Methods Of Compensation And Schedule Of Fees, Pursuant To Republic Act No.9266, Published In The Official Gazette, September 19, 2016 Issue) Of The Entire Building Inclusive Of Taxes And Duties. Proposals Exceeding The Approved Budget Shall Be Automatically Rejected. Viii. Estimated Duration Of Engagement The Duration Of The Contract Is Three Hundred Sixty (240) Calendar Days From The Design Phase Up To The Completion Of The Project From The Date Of Effectivity: I. Pre-design And Design Phase - 60 Calendar Days Ii. Construction Phase - 180 Calendar Days Ix. Minimum Requirements For Construction Safety And Health A. General Requirements No Contractor Or Subcontractor Shall Require Any Employee To Work In Surroundings Or Under Working Conditions That Are Unsanitary, Hazardous, Or Dangerous To His Health Or Safety. In Order To Meet This General Requirement, The Contractor Must: 1. Initiate And Maintain Programs (written Or Otherwise) To Comply With This General Requirement. 2. Provide Frequent And Regular Inspections Of The Job Sites By Competent Persons.  Competent Person Means One Who Is Capable Of Identifying Existing And Predictable Hazards In The Surroundings Or Working Conditions Which Are Unsanitary, Hazardous, Or Dangerous To Employees, And Who Has Authorization To Prompt Corrective Measures To Eliminate Them. 3. Prohibit The Use Of Any Machinery, Tool, Material, Or Equipment That Is Not In Compliance With Applicable Requirements. 4. Permit Only Those Employees Adequately Trained To Operate Machinery Or Equipment. 5. Provide Training For All Employees In:  Recognition And Avoidance Of Unsafe Conditions  Workplace Safety And Health Requirements  Applicable Hazards, Safe Handling, And Personal Protective Equipment Necessary For Handling Poisons, Caustics, Flammables, And Other Harmful Substances Relevant To Their Job Duties.  Specific Hazards And Procedures For Entering Confined Spaces If Applicable 6. Provide Provisions For Medical Care And First Aid. 7. Develop An Effective Fire Protection And Prevention Plan. 8. Ensure Appropriate Housekeeping Measures Including Clear Walkways And Removal Of Combustible Scrap And Debris. 9. Require The Wearing Of Appropriate Personal Protective Equipment Such As Hard Hats, Safety Glasses, Steel Toe Shoes, Or Other Appropriate Protective Equipment In All Operations Where There Is An Exposure To Hazardous Conditions. 10. Develop An Emergency Action Plan Covering Designated Actions Employers And Employees Must Take To Ensure Employees Safety From Fire And Other Emergency.  Plan Must Be In Writing For Employers With Greater Than 10 Employees  All Employees Must Be Trained Upon Initial Assignment On The Parts Of The Plan The Employee Needs To Know In The Event Of An Emergency. 11. Provide Access To Hand Washing Facilities, Toilets, And An Adequate Supply Of Drinking Water. 12. Provide Safety And Health Signs That Are Clearly Visible To Construction Workers And Public. 13. Conduct Regular Safety Meetings. Source: Colorado State University Occupational Health And Safety Section Department Of Environmental Health Fort Collins, Colorado X. Design Technical Specifications And Requirements The Bidder Shall Submit The Following Design Deliverables In Accordance With The Design Specifications, Parameters And Drawing Checklist But Not Limited To The Following: Activity Reports And Documents Required 1. Pre-design Phase 1.1 Master Site Development Plans And Conceptual 3d Design Five (5) Sets Duly Signed And Seal Master Site Development Plans In Hard Copy (at Least 20 X 30 Paper Size In Desired Minimum Scale) And Softcopy (editable File.dwg And 3d Model.skp/cad/etc) Powerpoint Presentation And/or Walkthrough Presentation 2. Design Phase 2.1 Detailed Architecture And Engineering Designs/plans Including Applicable And/or Approved Revisions To The Satisfaction Of The Procuring Entity Five (5) Sets Duly Signed And Seal Detailed Architecture And Engineering Plans/drawing In Hard Copy (at Least 20 X 30 Paper Size In Desired Minimum Scale) And Softcopy (editable File.dwg And 3d Model.skp/cad/etc) (refer To Design Parameters And Drawing Checklists) 2.2 Construction Technical Specifications Five (5) Sets Duly Signed And Seal Construction Technical Specifications In Hard Bound Xi. Space Requirements General Floors:  Ceiling Height Should Be At Least Three Meters Clear Height For 2nd Floor And Up. Ground Floor Lobby Must Be Of Higher Ceiling.  Provision Of Utility Room Enough To House Trolley And Dirty Utilities With Floor Drain  All Floors Shall Have Direct Access To Ramp  Both Stairs Are For Service And Emergency Use  External Window At Second Floor And Up Shall Be Of Awning Type.  Provision Of Electrical Room  Ramp For Wheelchair Access (with A Clear Width Of At Least 1.22 M. 4 Ft.).  Minimum Of Two (2) Exits, Remote From Each Other, For Each Floor Of The Building.  Exits Restricted To The Following Types: Door Leading Directly Outside The Building, Interior Stair, Ramp And Exterior Stair.  Exits Terminate Directly At Open Space To The Outside Of The Building. Ground Floor – Nutrition And Dietetics Service Facilities • Hospital Staff Dining Room - This Area Is Where Hospital Staff Diners Take Their Meals. - Planning Relationships: A. Close To Serving And Food Assembly Area B. Close To Dishwashing Area - Lighting System: C. For General Illumination, Provide At Least 250 Lux. - Power System: D. Provide At Least Four (4) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Auxiliary System: E. Provide And Install The Following Auxiliary System: • Communication System  Telephone System – Provide At Least One (1) Unit Telephone Outlet.  Local Area Network System – Provide At Least One (1) Unit Data Outlet.  Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: F. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: G. Provide Air Conditioning System. • Cooking And Baking Area - This Area Is Dedicated For Cooking And Baking Food, With High Pressure Gas Piping System. Equipment And Accessory Checklist: • Hood, Exhaust • Drainage Key Furniture/fixture Checklist: • Counter, 900mm High • Stainless Steel Grade 304 Sink, Single Compartment With Drainboard; 350-400mm Deep • Stainless Steel Grade 304 Sink, Double Compartment With Drainboard; 350-400mm Deep • Shelves, Overhead • Drain, Trench Grating • Concealed Floor Drain - Planning Relationships: A. Adjacent To Staff Dining Room B. Close To Dietitian’s Office - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least Thirteen (13) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least Two (2) Units Ground Fault Circuit Interrupter. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light And Two (2) Units For Exhaust Fan With Specifications Of 15a, 2p, And 240v, Single. - Standby/emergency System: E. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: F. Provide And Install The Following Auxiliary System: • Communication System  Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: G. Provide At Least Three (3) Units Smoke Detector. - Gas Piping System: H. Provide High Pressure Gas Piping System. - Equipment And Accessories: I. Provide Hood, Exhaust J. Provide Range With Oven K. Provide Range With Broiler - Air Conditioning System: L. Provide Air Conditioning System. • Food Preparation Area W/ Special Diet Preparation Area - This Area Is Where Food Service Workers Prepare Food Vegetables, Slice And Cut Meat And Fish, Segregate Food, Set-up And Assemble Cooked Food, Place Food Trays And Containers On Food Conveyors To Be Taken To Wards. This Is Also Where Dietitian Puts Tags On Prepared Trays For Pay Patients. This Also Includes Space For Special Diet Preparation Area Key Furniture/fixture Checklist: • Counter, Work; Stainless Steel Grade 304 • Stainless Steel Grade 304 Sink, Single Compartment, With Drainboard; 350-400mm Deep • Stainless Steel Grade 304 Sink, Double Compartment, With Drainboard; 350-400mm Deep • Counter, Food Preparation; Stainless Steel Grade 304 • Counter, Tray Set-up; Stainless Steel Grade 304 • Shelves, Overhead • Drain, Trench Grating; Stainless Steel - Planning Relationships: A. Adjacent To Staff Dining B. Close To Dietitian’s Office - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least Seven (7) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Auxiliary System: E. Provide And Install The Following Auxiliary System: • Communication System  Telephone System – Provide At Least One (1) Unit Telephone Outlet.  Local Area Network System – Provide At Least One (1) Unit Data Outlet.  Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: F. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: G. Provide Air Conditioning System. • Blenderized And Tube Feeding Area - This Area Is Where Preparation Of Food And Equipment Needed For Blenderized And Tube Feeding. Key Furniture/fixture Checklist: • Counter, Work; Stainless Steel Grade 304, With Cabinets Above And Shelves Below • Stainless Steel Grade 304 Sink, Single Compartment, With Drainboard; 350-400mm Deep • Stool, Adjustable Height • Concealed Floor Drain - Planning Relationships: A. Adjacent To Special Diet Preparation Area B. Close To Dietitian/nutritionist’s Office - Lighting System: C. For General Illumination, Provide At Least 250 Lux. - Power System: D. Provide At Least Three (3) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least Three (3) Units Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector (ionization Type). - Air Conditioning System: F. Provide Air Conditioning System. • Serving And Food Assembly Area - This Area Is Where Food Service Workers Set Up And Assemble Cooked Food, And Place Food Trays And Containers On Food Conveyors To Be Taken To Wards. Key Furniture/fixture Checklist: • Counter, Work; Stainless Steel Grade 304 • Stainless Steel Grade 304 Sink, Single Compartment, With Drainboard; 350-400mm Deep • Stool, Adjustable Height • Concealed Floor Drain - Planning Relationships: A. Adjacent To Staff Dining Room B. Close To Dietitian/nutritionist’s Office - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector (ionization Type). - Air Conditioning System: F. Provide Air Conditioning System. • Food Conveyor Parking - This Space Is For Transit Station For Food Tray Truck/conveyor. - Planning Relationships: A. Close To Dishwashing Area B. Adjacent To Food Assembly/tray Set-up Area - Lighting System: C. For General Illumination, Provide At Least 250 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector (ionization Type). - Ventilation System: F. Provide One (1) Unit Orbit Fan. • Cold Storage - This Area Is For Storage Of Poultry, Meat And Dairy Products Procured, Food That Easily Spoils (egg, Vegetables, Fruits), And Of Leftover Cooked Food That Are Still Edible Equipment And Accessory Checklist: • Refrigerator, 20 Cu. Ft. • Freezer, 20 Cu. Ft. • Chiller, 20 Cu. Ft., Reach-in Key Furniture/fixture Checklist: • Table; Stainless Steel Grade 304; 750 X 1200mm • Concealed Floor Drain - Planning Relationships: A. Adjacent To Dry Storage Room B. Close To Receiving Area C. Adjacent To Dietitian’s Office - Lighting System: D. For General Illumination, Provide At Least 150 Lux. - Power System: E. Provide At Least Ten (10) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: F. Provide At Least One (1) Unit Smoke Detector (ionization Type). - Ventilation System: G. Provide One (1) Unit Exhaust Fan. • Dry Storage - This Area Is For Storage Of Food Procured, Food Intended For The Next Two Meals, Of Excess Supplies For Future Use, And Of Food That Does Not Spoil Easily. Key Furniture/fixture Checklist: • Counter, Work • Shelves, 400 Mm Deep • Cabinet, Lockable - Planning Relationships: A. Adjacent To Cold Storage Room - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Power System: C. Provide At Least Three (3) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Parallel Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector (ionization Type). - Ventilation System: E. Provide One (1) Unit Orbit Fan. • Storage For Utensils/silverware - This Area Is For Storage Of Kitchen Utensils And Silverware Key Furniture/fixture Checklist: • Shelves, Open, 600mm Deep - Planning Relationships: A. Close To Dietitian’s Office - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Power System: C. Provide At Least Two (2) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Ventilation System: D. Provide One (1) Unit Orbit Fan. • Delivery Receiving Area - This Area With Exhaust Fan Is Dedicated For Dietitian On Duty And Auditor Witness Weighing Of Food Delivered By Supplier, And Where Auditor Inspects And Checks Quality Of Food Items Purchased From The Market And Those Delivered By The Supplier. Key Furniture/fixture Checklist: • Counter, Stainless Steel • Sink, Single Compartment With Drainboard; 350-400mm Deep • Counter, Tiled • Shelves, Open • Concealed Floor Drain - Planning Relationships: A. Adjacent To Dietitian’s Office B. Close To Cold And Dry Storage Rooms - Lighting System: C. For General Illumination, Provide At Least 150 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Ventilation System: E. Provide At Least One (1) Unit Orbit Fan. • Dishwashing And Pots Washing Area - This Area Is For Washing Of Pots, Pans, Trays, Dishes And Other Kitchen Utensils, And Where Food Service Workers Perform Other Clean-up Activities. Equipment And Accessory Checklist: • Dishwashing Machine, Floor Unit • Wash Container, 380 Mm Dia. • Waste Bin With Black Lining Key Furniture/fixture Checklist: • Counter, Stainless Steel Grade 304 • Stainless Steel Sink Grade 304, Double Compartment With Drainboard • Grease Trap • Counter, With Upturned Edge • Shelves, Open • Table, Feeder, Stainless Steel 700 X 1200mm • Table, Work, Stainless Steel 700 X 2400mm • Concealed Floor Drain - Planning Relationships: A. Close To Food Preparation Area B. Close To Dietitian’s Office - Lighting System: C. For General Illumination, Provide At Least 250 Lux. - Power System: D. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Parallel Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector (ionization Type). - Ventilation System: F. Provide At Least Two (2) Units Orbit Fan. • Waste Holding Area - This Area Is For Food Service Workers Sort Garbage Accordingly, Pack Garbage And/or Place Sorted Garbage Into Proper Bins/container, And Where Garbage Generated For A Day Or Two Is Temporarily Stationed Prior To Being Collected For Transfer To The Waste Management Service. Equipment And Accessory Checklist: • Garbage Bin Containers • Faucet With Hose Bibb Key Furniture/fixture Checklist: • Floor Drain - Planning Relationships: A. Located In The Perimeter Of The Dietetics Area - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Power System: C. Provide At Least One (1) Unit Ground Fault Circuit Interrupter (gfci). Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector (ionization Type). - Ventilation System: E. Provide At Least One (1) Unit Orbit Fan. • Dietitian’s Office / Staff Office - This Room Area Is Where The Chief Dietitian Calls Meetings With Staff For The Preparation Of Monthly Menu, Where Chief Dietitian And Staffs Reads, Writes And Uses Telephone In His Work Station, Dietitian And Staff Receive Visitors, Dietitian And Staff Store, File And Retrieves Records. - Planning Relationships: A. Located In The Kitchen Where It Shall Give The Dietitian Extensive/elevated View Of Work Areas And Control Over Possible Pilferage Of Dietary Supplies And Equipment. - Lighting System: B. For General Illumination, Provide At Least 500 Lux. - Power System: C. Provide At Least Twelve (12) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System  Telephone System – Provide At Least One (1) Unit Telephone Outlet.  Local Area Network System – Provide At Least One (1) Unit Data Outlet.  Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector (ionization Type). - Air Conditioning System: F. Provide Air Conditioning System • Staff’s Dressing, Lockers, Toilet And Bath - This Room/space Is Equipped With Secure Lockers, Private Dressing Rooms, And Accessible Toilets And Showers To Support Hygiene And Comfort For Male And Female Staff. This Space, With Its Own Separate Staff Entrance, Allows For Efficient Staff Flow. - Planning Relationships: A. Close To Dishwashing Area B. Adjacent To Food Assembly/tray Set-up Area - Lighting System: C. For General Illumination, Provide At Least 150 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. • Storage/closet - This Area Is For Storing Cleaning Materials Such As Detergents, Disinfectants, Brushes, Mops, And Other Sanitation Tools Used In Dietary Operations. - Planning Relationships: A. Located Within Patients Dishwashing Area. - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Power System: C. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. • Lpg Storage Area - This Area Is Well-ventilated Space Designed For The Safe Storage Of Lpg Tanks Used In Kitchen Operations. The Area Will Be Located Away From Open Flames, Heat Sources, And High-traffic Zones To Ensure Safety. It Will Feature Non-combustible Walls, A Fire Extinguisher, Proper Signage, And Adequate Lighting. The Space Will Also Include Provisions For Leak Detection, An Accessible Emergency Shut-off Valve, And Ground-level Storage To Prevent Accidental Tipping Of Lpg Tanks. - Lighting System: A. For General Illumination, Provide At Least 250 Lux. - Power System: B. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. • All Gender / Pwd Toilet & Bath - This Area Is Designed To Be Inclusive, Complying With The Updates To The Amended Irr Of Bp 344. It Ensures Accessibility For All Genders And Persons With Disabilities (pwd), Featuring Wide Doors, Support Bars, Urinal And Spacious Layout To Meet The Latest Standards For Accessibility And Comfort. - Planning Relationships: A. Accessible To All Staffs. B. Minimum Of One (1) Toilet On Each Floor Accessible To Disabled. - Lighting System: C. For General Illumination, Provide At Least 150 Lux. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. • Electrical Room - Located On The Ground Floor In The Staff Hallway, It Is Strategically Placed To Maintain Separation And Safety While Ensuring Easy Access For Maintenance And Operation. - Lighting System: A. For General Illumination, Provide At Least 250 Lux. - Fire Alarm System: B. Provide At Least One (1) Unit Smoke Detector. - Power System: C. Provide At Least One (1) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. • Common Toilet With Sink (female And Male Toilet Cubicle) - This Area, Featuring Separate Female And Male Toilet Cubicles, Will Serve Both The Dietitians/staff Office And The Hospital Staff Dining Room. It Will Be Designed For Accessibility And Include Standard Fixtures, Such As Sinks, Mirrors, And Hand Dryers Or Paper Towel Dispensers. The Space Will Prioritize Hygiene And Ease Of Maintenance With Durable, Easy-to-clean Surfaces, Adequate Lighting, And Ventilation. - Planning Relationships: A. In Between Dietitians/staff Office And Hospital Staff Dining - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. Xiv. Design Parameters (architectural) A. Codes And Standards The Architectural Works Shall Be In Accordance With The Following Laws, Codes And Standards.  Laws And Codes: 1. National Building Code Of The Philippines And Its Latest And Amended Irr 2. Ra 9266 Or Architecture Law And Its Latest And Amended Irr 3. Ra 4226 Or Hospital Licensing Act And Its Latest And Amended Irr 4. Bp 344 Or Accessibility Law And Its Latest And Amended Irr 5. Ao 35, S. 1994 Or Ao Pertaining To The Control Of Radiation Hazards 6. Ra 9514 Fire Code Of The Philippines 7. Existing Local Codes And Ordinances. 8. And Other Laws That Applies To The Projects  Standards: 1. Bureau Of Product Standards (bps) 2 Underwriters Laboratory (ul) 2. Doh Technical Guidelines For Hospital & Health Facilities Planning And Design – Level 3 B. General Drawing Guidelines 1. General  All Drawings Shall Be Computer-drafted. Drawings Shall Be Submitted Both In Printed And Electronic Copies.  Keep The Same Orientation For All Plans. The North Orientation Shall Be Indicated In All Architectural Floor Plans. The Orientation Of The Architectural Plans Shall Be Consistent With All The Engineering Plans.  Existing Buildings And New Works Shall Be Clearly Indicated And Labeled In The Site Plans.  Detailed Plans Shall Have A Scale Not Smaller Than 1:50 Meters.  Spot Detailed Plans, Elevations, And Sections Shall Have A Scale Not Smaller Than 1:10 Meters.  Avoid Notes Such As ‘see Architectural Detail’ Or ‘see Structural’. Always Refer With A Callout To The Specific Detail Drawing And Sheet Number. 2. Site Plans  The Site Plans Shall Have A Scale Not Smaller Than 1:500 Meters. 3. Floor Plans  All Plans Shall Be 1:100 Meters. The Same Scale Shall Be Used For The Rest Of The Architectural, Structural, Sanitary, Plumbing, Electrical And Mechanical Plans, Except For Each Trade’s Site Plan, Detailed Plans And Spot Details.  Elevation Callouts Shall Be Indicated On The Floor Plans And Shall Be Consistent With The Elevation Drawing.  Section Line Callouts On The Floor Plans Shall Be Consistent With The Section Drawing.  Floor Plans Shall Be Indicated With Boxed Room Callout Numbers, Including The Callout For Floor Finishes And Wall Finishes.  Floor Elevations Shall Be Indicated In The Floor Plans. This Shall Be In Reference To The Natural Grade Line Or The Established Finished Floor Lines Of The Adjoining Existing Buildings.  The Location Of Mechanical Equipment, E.g. Air Conditioning Shall Be Indicated In The Floor Plans. This Shall Be Consistent With The Mechanical And Electrical Plans.  Door Callouts Shall Be Circles With The Proper Numbering, E.g. D-01.  Window Callouts Shall Be Hexagons With The Proper Numbering, E.g. W-01. 4. Elevations And Sections  Finish Floor Lines And Top Of Truss Lines Shall Be Consistent In All The Elevations, Sections And Structural Plans And Details. 5. Reflected Ceiling Plans  Reflected Ceiling Plans Shall Be Indicated With Boxed Room Callout Numbers, Including The Callout For Ceiling Finishes And Lighting Fixtures.  Ceiling Height Relative And In Reference To The Finish Floor Line Shall Be Indicated In The Reflected Ceiling Plans In Each Room With Boxed Dimensions. This Is To Ensure That The Ceiling Heights Of All Rooms Are Established Whether Or Not Reflected In The Sections.  The Description And Location Of The Fixtures, E.g. Lighting, Smoke Detectors, Air Condition Vents, Exhaust Fans, In The Reflected Ceiling Plans Shall Be Consistent With The Electrical And Mechanical Plans. 6. Roof Plans  Location Of All Downspouts Shall Be Indicated In The Roof Plans. 7. Doors And Windows  Door And Window Schedules Shall Indicate The Type Of Door Or Window, The Number Of Sets, The Location/s Of The Door Or Window, The Materials And Accessories Included And Other Special Specifications, E.g. Color Or Finish. All Windows Above Ground Floor Should Be Of Awning With An 45 Deg. Opening Angle. 8. Details  Provide A Minimum Of One (1) Bay Section Of A Scale Not Smaller Than 1:50 Meters For Each Major Building Preferably Cut Along The Area With Special Construction Design.  Provide Spot Detail Plans, Elevations And Sections Of A Scale Not Smaller Than 1:10 Meters For Special Designs With Aesthetic Treatment And Ornamentation.  Provide Detailed Plans Of A Scale Not Smaller Than 1:50 For All Areas Needing Tile Pattern, E.g. Lobby, Corridor, Entrance Walk, Showing The Position And Pattern Of Tiles.  Centerline Location Of Plumbing Fixtures Shall Be Indicated In Detailed Plans With Lines Of Reference And Its Corresponding Dimensions. This Is To Indicate The Exact Locations Of The Plumbing/sanitary Roughing-ins. C. Site Works 1. The Master Site Development Plan Of The Hospital Shall Include The Following:  Contour And Survey Of The Lot, Including Bearing And Distance Of The Property Line  Road Network And Curbs And Sidewalks  Parking Spaces  Reference Location Of Existing Trees  Reference Location And Footprint Of Existing Buildings, With The Corresponding Building Names And Dimensions, Including Distances Between Adjacent Buildings, And Distances Between Buildings And The Nearest Property Line  Reference Location Of Utilities, E.g. Water Reservoirs, Septic Tank, Wastewater Treatment Plant, Powerhouse, Transformers, Waste Storage Area, Security Outposts 2. The Layout Of The Buildings On The Site Shall Be Zoned According To The Service It Provides:  The Outer Zone Shall Include All Front-line Services, E.g. Emergency, Out-patient, X-ray, Laboratory And Other Ancillary Departments.  The Inner Zone Shall Include The Wards.  The Deep Zone Shall Include Services Like The Operating Room, Delivery Room, Nursery, Intensive Care Unit And Other Sensitive Hospital Services.  The Service Zone Shall Include Non-medical Services But Are Essential To Hospital Operations, E.g. Staff Lounge And Lockers.  There Shall Be A Separate Road Network And Entry/exit For The Public And The Service Vehicles, E.g. Ambulance, Waste Collection Vans, Delivery Trucks.  In Limited Lot Areas, Buildings Should At Least Be Spaced Four (4) Meters Apart To Allow Natural Light And Ventilation.  Covered Walkways Shall Be Provided For Access And Connection To All The Buildings.  Ramps Shall Be Provided In All Main Entrances Of The Buildings And Other Access Openings To Walkways Leading To Other Buildings. D. Building Architectural Works 1. Floor Plans  The Structural, Sanitary, Plumbing, Electrical And Mechanical Designs Are Required To Refer To The Architectural Plans And Specifications In Case Of Discrepancies. If An Engineering Design Will Have Any Possible Conflict Or Interference On The Architectural Design, The Latter May Be Adjusted Provided That The Aesthetic Value Will Not Be Compromised.  The Architectural And Engineering Plans Shall Be Consistent All Throughout In Terms Of Dimensions And Locations Of Columns, Beams, Walls, Roof Line, Conduits, Ducts, Pipes, And Fixtures, Among Others. Column And Beam Grid Lines Shall Also Be Consistent In All The Architectural And Engineering Plans.  Verify And Coordinate Floor Plans With The Mechanical, Electrical And Sanitary Design With Regard To The Requirements For Mechanical Rooms, Ahu Rooms, Electrical Rooms, Pipe Chase, And Other Engineering Requirements.  Public Toilets Shall Have Provisions And Fixtures For Persons With Disability As Required By Bp 344. If Enough Space Allows, Toilets Specially Made And Designated For Persons With Disability Is Preferable. 2. Walls  Exterior Walls Shall Be 200mm. Thick, While Interior Walls Shall Be 150mm. Thick. This Is Indicative Of The Finished Wall Thickness Including The Plastering And Tile Works.  Used Soundproofed Wall Materials For Areas With Indicated “soundproofed”. Walls With An Stc Rating Of At Least 45-50 Is Recommended. In Areas Where High Confidentiality Or Privacy Is Required (e.g., Patient Rooms, Doctor’s Offices Near Noisy Zones), Consider An Stc Rating Of 55-60.  Double Layer Of Drywall: Use Two Layers Of Drywall On Either Side Of A Metal Or Wood Stud Frame For Enhanced Soundproofing.  Acoustic Insulation: Use High-density Insulation Like Mineral Wool Or Acoustic Fiberglass In Wall Cavities To Absorb Sound.  Higher Mass: Increase The Wall's Mass With Materials Like Masonry Or High-density Concrete, Which Can Significantly Reduce Sound Transmission.  Toilet Wall Tiles Shall Be 300mm. X 300mm. For Areas Of Six (6) Square Meters Or Below. Toilet Wall Tiles Shall Be 300mm. X 600mm. For Areas Above Six (6) Square Meters.  Layout And Work On Wall And Floor Tiles Must Be Aligned, Plumb, Level, And Square.  All Edges, Corners And Intersections Of Toilet Tiles, Including The Top-most Tile Not Reaching The Ceiling Shall Be Provided With Polyvinyl Chloride Tile Trims.  Tile Color And Design Shall Be Approved First Before Installation. 3. Floors  If Floor Tiles In Two Adjacent Rooms With Different Material, Color Or Design Meet At The Door Opening, The Cut Shall Be Located Middle Of The Door Thickness When In A Closed Position. Provide Details In The Floor Pattern Design.  Floors At The Openings Of Toilets For Persons With Disability Shall Be Sloping. Indicate In The Plans And Sections.  The Size Of The Toilet Floor Tiles Shall Be 300mm. X 300mm. For Areas Of Six (6) Square Meters Or Below. Toilet Floor Tiles Shall Be 300mm. X 600mm. For Areas Above Six (6) Square Meters. Indicate The Tile Pattern.  The Size Of The Pantry/lounge Floor Tiles Shall Be 600mm. X 600mm. Indicate The Tile Pattern.  The Size Of The Floor Tiles Of The Offices And Wards Shall Be 600mm. X 600mm, Or Bigger Depending On The Proportion To The Size Of The Room. Indicate The Tile Pattern.  The Size Of The Floor Tiles Of The Lobby And Corridor Shall Not Be Less Than 400mm. X 400mm. The Tile Size Of 600mm. X 600mm. Is Recommended For Bigger Areas. Indicate The Tile Pattern.  Layout And Work On Wall And Floor Tiles Must Be Aligned, Plumb, Level, And Square.  All Edges, Corners And Intersections Of Toilet Tiles, Shall Be Provided With Polyvinyl Chloride Tile Trims.  Tile Color And Design Shall Be Approved First Before Installation. 4. Ceiling Works  Ceiling Height For Areas With Special Aesthetic Treatment, E.g. Lobby, Major Conference Room, Auditorium, Executive Office, Shall Be Proportional To The Area Or Room Or As Required By The Designer. However, This Shall Not Be Lower Than 2700mm. Provide Details.  If Acoustic Boards On Aluminum T-runners Would Be Used For The Ceiling, Layout Should Be On Center And Avoiding Cut Pieces. If The Remaining Perimeter Of The Ceiling Is Less Than 600mm. Wide, It Shall Be Designed Complimentary With Fiber Cement Boards On Light Gauge Metal Furring. Likewise With Acoustic Boards In Big Areas, E.g. Offices, And Wards, Shall Be Designed In A Way To Break The Redundancy. Provide Details.  Soffit Of Exterior Beams And Slabs Shall Have Drip Moulds To Prevent Damage Due To Water Sipping Into The Eaves Or Ceiling. Section Details Shall Be Required To Show The Drip-mould.  Acoustic Panels: Adding Absorptive Finishes, Such As Fabric-covered Acoustic Panels, Can Help To Dampen Internal Reflections And Improve Sound Quality Within Rooms, Although These Don’t Block Sound But Reduce Reverberation.  Non-cove Light Placement: Instead Of Cove Lighting, Use Flush-mounted Lighting Directly In The Ceiling With Sealed Housings That Prevent Dust Buildup. Fixtures Should Be Durable, Non-reflective, And Easy To Clean Without Requiring Special Maintenance Procedures. 5. Doors And Windows  Major Rooms That Require Security Shall Have Sturdy Doors E.g. Wood Panel, And Metal.  Minor Rooms That Do Not Require Security Shall At Least Have Wood Flush Doors.  Toilets And Other Wet Areas Shall Have Steel Doors.  Heavy-use Doors, E.g. Operating Rooms, Delivery Rooms, Should Be Provided With Stainless Steel Kick Or Push Plates And Door Closers.  Fire Escape Doors Should Be Provided With Panic Hardware And Door Closers, And Shall Conform With The Requirements Of The Fire Code Of The Philippines.  Aluminum Frames Of Glass Doors Shall Be Powder-coated.  Door Finish And Color Shall Be Approved First Before Application.  Window Sills Shall Be Slightly Sloped Outwards To Prevent Damage To Windows And Paint Due To Water Seepage. Section Details Shall Be Required To Show This Slope.  All Doors Of A High-occupancy Room Shall Swing Outwards And As Required By The Fire Code Of The Philippines.  Door Jambs With No Moulding/casing Installed On Concrete Walls Shall Have Construction Grooves All Around. Provide Details.  All Doors And Windows Shall Have Reinforced Concrete Lintel Beams. Provide Details.  Door Seals And Frames: For Soundproofed Rooms, Also Use Solid-core Doors With Perimeter Seals To Prevent Sound From Leaking Through Door Frames. 6. Stairs, Ramps And Corridors  Ramps For Persons With Disability Shall Have A Slope Not Higher Than 1:12. Handrails And Clearances Shall Conform With The Requirements Of Bp 344.  Regular Stairs Shall Have Risers At 150mm. High And Treads At 300mm. Wide. Fire Stairs Could Have A Maximum Riser At 200mm. And Tread At 250mm. Handrails Shall Be 1100mm. High. Clearances Shall Conform With The Requirements Of The Fire Code Of The Philippines.  Corridors Shall Have A Minimum Unobstructed Width Of 2450mm. This Shall Be Measured Clear From The Surface Of The Finished Wall And Not On-center Of The Rough Chb Wall.  Corridors Shall Not Be Areas For Temporary Or Permanent Storage Of Stretchers, Wheelchairs, Trolleys, Food Carts, Oxygen Tanks Or Other Movable Hospital Equipment. Storage Or Parking Spaces Shall Be Provided For These.  Corridors And Exit Doors Shall Conform With The Requirements Of The Fire Code Of The Philippines. 7. Fixtures And Accessories  Three-way Electrical Light Switches Shall Be Provided At The Foot And The Top Of The Stairs Per Floor. Likewise, At Both Ends Of A Long Corridor.  Electrical Light Switches Shall Be Located By The Knob Side Of The Door.  Electrical Switches And Outlets Shall Be Installed Plumb And Level.  Public Toilets Shall Always Be Provided With Heavy-duty Soap Dispensers And Electric Hand Dryers.  Public Toilets Shall Always Be Provided With Stainless Steel Handrails In Conformity To The Requirements Of Bp 344.  A Drainage Line Shall Be Provided For Window-type Air Conditioners. Likewise, Split-type Air Conditioners Located In The Interior Part Of The Building Shall Be Located Adjacent To Areas With Drainage Lines, E.g. Toilets, Downspouts, Balconies.  Seal Gaps And Openings: Ensure All Joints, Gaps, And Penetrations (e.g., Electrical Outlets, Ducts) Are Sealed With Acoustical Caulk Or Gaskets To Prevent Sound Leakage.  Sterile Area Lighting Type: Use Sealed, Recessed, Or Surface-mounted Led Fixtures That Are Flush With The Ceiling Surface To Prevent Dust Accumulation. 8. Roofing Works  The Section Of The Roof Gutters Shall Be Designed, In Case Of A Clogged Downspout, So That The Overflow Of Water Will Be Directed Outside Of The Building And Not Towards The Eaves Or Interior Ceiling To Prevent Any Damage. Provide Details.  Avoid Valley Or Inside Gutters In Roof Design. But In Cases Required In Aesthetic Design, Valley Or Inside Gutters Shall Be In Stainless Steel Or Concrete Gutters With Membrane-type Waterproofing, And The Section Shall Be Designed With A Capacity For Big Volume To Prevent Any Damage Due To Overflow. Provide Details.  Parapets, Designed As A Roof Protection From The Winds, Must Be Designed To Satisfy The Preceding Parameters. Provide Details.  The Slope Of The Roof Shall Not Be Less Than 30 Degrees. 9. Painting  Painted Ceiling Shall Be In Flat Latex Finish, While Cornices And Mouldings Shall Be In Gloss Enamel Finish.  Painted Interior Wall Shall Be At Least In Semi-gloss Latex Finish For Ordinary Rooms, E.g. Offices, Unless Specified To A Higher Type Of Paint.  Patient-related Rooms, E.g. Emergency Rooms, Out-patient Departments And Wards, Shall Be In Anti-bacterial And Odor-absorbent Paint Finish.  Special Rooms, E.g. Operating Rooms, Delivery Rooms, And Laboratories Shall Also Be In Anti-bacterial And Odor-absorbent Paint Finish.  Painted Exterior Wall Shall Be At Least In Moisture-resistant/water-repellent Solvent-based Paint Finish, Textured Or Smooth, Unless Otherwise Specified.  Paint Color And Shade Shall Be Approved First Before Application. D. Specific Requirements 1. Provide Spot Detail Plans And Sections Of The Following:  Gutter, Eaves, And Parapet  Ceiling - Covelight, Special Connections And Design, Mouldings, Valances  Stairs - Handrail, And Baluster Design  Ramps - Handrail Design And Floor Pattern  Doors, Windows And Gates - Grille Works,  Special Architectural Treatment And Design, E.g. Façade Design, Special Window And Door, Counters  Special Carpentry Works, E.g. Partitions, Cabinetry  Building And Room Signages And Wayfinding Systems  All Pwd Toilets Shall Be Labelled “all Gender / Pwd Toilet”  Other Details As May Be Required 2. Provide Room Data Sheets, Including Detail Floor Plan, Ceiling Plan And Sections Of The Following Rooms, In Coordination With The Requirements Of The Electrical, Sanitary And Mechanical Designs: A. Cooking Area, Including Furniture And Equipment With Specific Dimensions Of The Location Of Fixtures And Accessories, And In Coordination With The Requirements Of The Electrical And Mechanical Engineering Design. B. Hospital Staff Dining C. D. (all Blanks Shall Be Filled As Required By Or Applicable To The Project.) E. Summary Of Materials  Materials To Be Used Shall Be Fire-resistant, Non-toxic, Moisture-resistant And Termite-resistant, E.g. Fiber Cement Board, Light-gauge Steel Frame, Polyvinyl Chloride Ceiling Panels.  Wet Areas, E.g. Toilets, And Pantry/lounge Shall Use Non-skid/non-slip Vitrified Ceramic Floor Tiles.  Heavy Traffic Areas, E.g. Lobby, And Corridor Shall Use Heavy-duty Seamless Granite Floor Tiles Or A Higher Type Of Floor Material.  Ramps And Stairs Shall Use Non-skid/non-slip Floor Tiles, Materials As Specified.  Aluminum T-runners Shall Be Powder Coated.  Metal Rod Hangers With Adjustable Clips, And Not Galvanized Iron Wires, Shall Be Used To Support And Suspend The Aluminum T-runners And Light Gauge Metal Furrings.  Roofing Sheets Shall Be Ga.# 24 Aluminum-coated, Pre-painted, And Pre-formed. F. Drawing Requirements: See Attached Doh Checklist Of Drawings. -end Of Architectural Design Parameters- Xv. Design Parameters (structural/civil Works) A. Codes And Standards The Civil/structural Design Shall Be In Accordance With The Following Codes And Standards  Codes 1. National Structural Code Of The Philippines (nscp) 2010 2. National Building Code Of The Philippines And Its Revised Irr 3. Accessibility Law 4. Local Codes And Ordinances  Standards 7. Bureau Of Product Standards (bps) 8. Philippine National Standards (pns) 9. Dpwh Blue Book 10. American Concrete Institute (aci) 11. American Society For Testing Materials (astm) 12. American Welding Society (aws) B. Site Works Based On The Master Site Development Plan Of The Hospital, Provide Where Applicable Complete Design And Details Of Hospital Road (concrete With Curb And Gutter, Including Drainage) Network, Walkways, Parking Areas And Fencing. 1. The Main Hospital Road Shall Be Capable Of Two-way Traffic (at Least 6mts. Width) With A Minimum Thickness Of 150mm (8 Inches). Concrete Strength Should Be At Least 3000psi. Interior Roads (leading To Support Facilities) Shall Be Designed To Accommodate Delivery Vehicles, And Fire Trucks In Case Of Emergency. 2. Walkway Should Be At Least 100mm Thk. With Concrete Strength Of 2500psi. Ramps Should Be Provided, Instead Of Steps, For Any Change In Elevations. 3. Parking Area Slabs Should Be At Least 150mm Thk. With Concrete Strength Of 3000psi. 4. Fences Should Be Seen Through In Front Of The Hospital While The Tree (3) Other Sides Should Be Concrete Hollow Blocks With Minimum Height Of 2 Meters And To Be Provided With Perimeter Lighting. See-through Fence Design Will Be Made Of 32mm Square Bars Spaced At 100mm On Center And Provided With Three (3) Concrete Hollow Blocks (45mm High) Zocalo Walls. C. Buildings 1. The Hospital Buildings Should Be Designed Using A Seismic Importance Factor Of 1.5 For The Immediate Occupancy Category. Buildings Should Be Designed In Accordance With Nscp Requirements Up To Magnitude 7 For Those Near Seismic Source Type A. Seismic Gaps Between Buildings (old And New) Should Be Properly Observed. 2. The Hospital Buildings Should Be Designed Also Using Wind Importance Factor Of 1.15 (especially For Design Of Trusses/roofing System). Concrete Gutters And Parapet Walls Should Be Provided As Additional Protection To The Roofing System During Strong Typhoons. Wind Velocity Of 300-350 Kph Shall Be Considered Upon The Recommendation Of Structural Engineer 3. The Structural Designer Should Verify With Philippine Volcanology And Seismology (phivolcs) The Distance Of The Proposed Hospital To Nearest Active Fault Lines And With The Denr For Geo-hazard Mapping. 4. Soil Investigation (at Least Three Boreholes) Should Be Conducted To Determine Soil Bearing Capacity And Recommended Foundation Design (applicable Even For One Storey Structure). 5. The Structural Designer Is Encouraged To Use Fire-resistive And Non-toxic Materials. D. Details – The Following Shall Be Provided: 1. Connection Details Of Beams And Columns Following The Requirements Of Nscp On Confined Areas. 2. Connection Of Trusses To Beams And Columns. 3. Splicing Details Of Reinforcing Bars On Columns And Beams And The Required Bar Cut-off Points. 4. Details For Connection Of New Construction & Old Construction Structural Members Such As Expansions Joints For Thermal Expansion/contraction. 5. Include Thermal Expansion/contraction Prevention Methodologies Specifically On Soft Joints Areas Between Structural And Architectural Members. E. Summary Of Materials 1. Concrete Shall Be Portland Cement And Conforming To Astm Specification C150, Type I To Type Ii 2. Coarse Aggregates Shall Consist Of Washed Gravel, Crushed Stone Or Rock Or A Combination Thereof Conforming To Astm C33 3. Concrete Hollow Blocks Shall Be A Standard Product Of Recognized Manufacturer Conforming To Pns 16 With At Least 350psi Strength. 4. Reinforcing Bars Shall Conform With Pns Grade 60 For 16mm Dia. And Above And Pns Grade 40 For 12mm Dia And Below. 5. Structural Steel Shall Conform With Astm A36/a6m 6. Bolts And Studs Shall Conform With Astm A 325 7. Welding Electrodes Shall Be E60 Or E 70 And Conform With Aws F. Drawing Requirements: See Attached Checklist -end Of Structural/civil Works Design Parameters- Xvi. Design Parameters (sanitary/plumbing Works) A. Codes And Standards The Sanitary/plumbing Design Shall Be In Accordance With The Following Codes And Standards.  Codes: 1. National Building Code Of The Philippines And Its New Irr 2. Fire Code Of The Philippines 3. National Plumbing Code Of The Philippines (npcp) 4. Sanitation Code Of The Philippines 5. Existing Local Codes And Ordinances.  Standards: 1. Bureau Of Product Standards (bps) 2. Philippine National Standards For Drinking-water 3. Underwriters Laboratory (ul) 4. Doh National \ Laboratory (nrl) 5. Doh Health Care Waste Management Manual 6. National Water Resources Board (nwrb) 7. National Plumbers Association Of The Philippines (nampap) 8. Philippine Society Of Sanitary Engineers, Inc. (psse) B. Site Works  Based On The Master Site Development Of The Hospital, The Site Works Shall Provide Complete Layout Of The Following: 1. Storm Drainage Network, Indicating Drainage Manholes And Pipe Culvert; 2. Sewerage Pipe Network, Indicating Sewage Manholes, Sewage Pipes And The Location Of The Proposed Sewage Treatment Plant; And 3. Water Supply Network, Indicating The Location Of Water Service Entrance, Cisterns, Elevated Water Tank And Proposed Pump House.  The Storm Drainage Network Shall Accommodate The Magnitude Of Peak Rates Of Surface Run-off Including Drainage Coming From The Buildings. The System Shall Be Capable Of Handling The Design Flows Routing To The Designated Outfall; For Rainfall Calculation And Sizing Of Drainage Pipes, Refer To Table-d2, Appendix-d, National Plumbing Code Of The Philippines And Current Rainfall Record From Pagasa.  The Sewerage Pipe Network Design Shall Accommodate All Sewage Coming From All The Facilities, Conveyed By Gravitational Flow Leading To The Sewage Treatment Plant; Per Capita Wastewater Demand: 100-130 Gal/capita/day Per Bed C. Building Facilities Sanitary/plumbing System 1. Sewer Line And Vent System  Provide Complete Sewer Line And Vent System From All (domestic) Plumbing Fixtures And Floor Drains, Laid By Gravity Flow Leading To The Sewage Treatment Plant (stp);  For Demand Weight Of Fixtures In Fixture Units; Refer To Appendix A, Table A-2, Npcp 2. Wastewater Line And Vent System  For All Wash Areas Dealing And Generating With Oil/grease, Provide Separate Wasteline And Vent System And Solely Tap To The Proposed Grease Trap And Then Connect Its Effluent To The Sewage Treatment Plant.  For Estimated Demand Weight Of Fixtures In Fixture Units; Refer To Appendix A, Table A-2, Npcp Waterline System  Provide Complete Cold Water Supply Pipes To All Plumbing Fixtures. From The Main Water Source, The Water Shall Be Pumped To The Elevated Water Tank (ewt) And Conveyed To The Fixtures By Gravity System And Or Distributed To Fixtures By Transfer Pumped With Constant Pressure Through A Pneumatic Storage Tank, Whichever Is Feasible. 4. Storm Drainage System  Complete Storm Drainage System Shall Be Provided For All Roofs, Canopies, Concrete Ledges And Balconies Including Condensate Drains Laid For Gravity Flow Connected To A Leader/pipe Line Leading To The Natural Ground Level Storm Drainage Network. D. Specific Requirements  Provide Details Of The Following: 1. Grease Trap (for Dietary) 2. Provision Of Water Softener 3. Fiberglass Pressure Tank E. Summary Of Materials  Sewer And Vent Pipes; Unplasticized Polyvinyl Chloride (upvc) Extra Series 1000 (conforming To Iso 3633 Astm D2729 Including Trims And Fittings)  Storm Drainage Pipes; Downspouts, Unplasticized Polyvinyl Chloride (upvc) Extra Series 1000 (conforming To Iso 3633 Astm D2729 Including Trims And Fittings, Bps Certified)  Drainage Pipes; 250mm Dia. And Below, Non-reinforced Concrete Pipe (nrcdp)  300mm Dia. And Above, Reinforced Concrete Pipe (rcdp)  Drainage Manholes; Street Inlet, Curb Inlet, Traffic Type Reinforced Concrete Area Drain/catch Basin, Reinforced Load Bearing Chb  Sewage Manholes; Traffic Type Reinforced Concrete With Standard Steel Brass Cover  Wastewater Pipeline; Extra Heavy (xh) Single Hub, Hub Less Cast Iron Pipes And Fittings (cip) Conforming To Astm Standard 888  Cleanouts; Cast Iron Brass With Countersunk Plug (bps Certified)  Floor Drains/deck Drains; Cast Iron Brass (bps Certified)  Gutter Drains; Cast Iron Dome Type Brass (bps Certified)  Cold Waterline Pipes; For Buildings, Polypropylene Pn10 Fusion Weld Pipes Including Trims And Fittings (bps Certified)  Hot Waterline System; For Buildings, Polypropylene Pn20 Fusion Weld Pipes Including Trims And Fittings (bps Certified)  Trench Grating; Galvanized/stainless Steel Iron Grates  Plumbing Fixtures Including Trims, Fittings And Accessories; (bps Certified)  Water Closet-tank Type Push Button Flush  Lavatory - (pedestal/counter Type) With C-spout Spray Faucet  Kitchen Sink-ga#16 Stainless Steel Seamless Bowl With Gooseneck Faucet  Urinal-wall Hung Flush Valve Type  Plumbing Fixtures At Sterile Areas; A. Scrub-up Sink-ga#16 Stainless Steel (single/double Bowl) Compartment With Knee Operated And Or Censor Controlled Spay Faucet B. Surgical Soap Dispenser-ga#16 Stainless Steel Foot Operated C. Laboratory Sink-ga# 16 Stainless Steel Deep Seated Seamless Bowl Compartment With C-spout Spray Faucet F. Drawing Requirements: See Attached Doh Checklist Standards Based On Revised Irr Of The National Building Code Of The Philippines (pd 1096) -end Of Sanitary/plumbing Works Design Parameters- Xvii. Design Parameters (mechanical Works) A. Codes And Standards The Mechanical Design Shall Be In Accordance With The Following Codes And Standards.  Codes: 1. National Building Code Of The Philippines And Its New Irr 2. Fire Code Of The Philippines 3. Mechanical Engineering Code Of The Philippines (me Code) 4. Existing Local Government Codes And Ordinances.  Standards: 1. Bureau Of Product Standards (bps) 2. Philippine National Standards (pns) 3. Underwriters Laboratory (ul) And Factory Mutual (fm) 4. International Electrotechnical Commission (iec) 1988 5. National Fire Protection Association (nfpa) 6. National Fire Protection Association (nfpa) 99 Standard For Health Care Facilities. 7. American Society Of Heating, Refrigeration And Air Conditioning Engineers (ashrae). 8. Center For Disease Control And Prevention (cdc) Manual. B. Automatic Fire Sprinkler System  The Automatic Fire Sprinkler System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. Site Development Plan And Vicinity Map, Indicating The Location Of The Buildings, Firewater Reserve Tank, Firewater Line, Yard Loop And Private Fire Hydrant. 2. General Notes, Legends And Symbols Including Schematic Diagram Of The Fire Sprinkler System And Schematic Diagram Of Alarm Monitoring System. 3. Floor Layout And Isometric Layout Of The Automatic Fire Sprinkler System Indicating Pipe Sizes And The Location Of The Pipes, Valves, Sprinkler Heads, Riser Nipples, Fire Hose Cabinets, Sprinkler Main Riser, Drain Pipes, Cross Mains, Branch Lines, Inspector’s Test Connections, Hangers And Sway Braces. 4. Equipment Schedule, Detail Drawings, Fire Pump And Jockey Pump Layout. 5. Architectural, Structural, Electrical And Plumbing Drawings Of The Firewater Tank And Pumphouse.  An Automatic Fire Sprinkler Shall Be Provided In All Hospital Building Except For Those Fire Resistive One-storey Hospital Building.  Hazard Classification Shall Be Light Hazard Occupancy.  Area Of Coverage Shall Be 146 Square Meters And Water Density Shall Be 4.07 Lps/sq. M.  Protection Area Per Sprinkler Head Shall Be 20 Square Meters At 2.2 Meters Minimum Distance Between Sprinklers And 4.2 Meters Maximum Spacing.  All Floor Control Valves Shall Be Equipped With Supervisory Switch, Water Flow Detector And Drain System.  Water Supply Shall Be Horizontal Split Case Centrifugal Fire Pump With Diesel Engine Or Ac Motor And A Vertical In-line Jockey Pump With Controller.  Firewater Reserve Tank Shall Be Ground Level Monolithic Concrete Tank Sized For A Minimum Of 30 Minutes.  Hydraulic Calculations Report Shall Be Based On Npfa-13 Format. C. Ventilation And Air Conditioning System  The Ventilation And Air Conditioning System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. General Notes, Legends And Symbols Including Schematic Diagram Of The Ventilation And Air Conditioning System. 2. Floor Layout Of The Ventilation And Air Conditioning System Indicating The Capacity And Location Of The Air Conditioners And Fans. 3. Duct Layout Indicating Duct Sizes, Route And Location Of The Dampers, Diffusers, Return Air Register, Hangers And Sway Braces. 4. Refrigerant Piping Layout Indicating Pipe Sizes, Location Of Valves, Hangers And Sway Braces. 5. Equipment Schedule And Details Drawings Of Air Conditioners And Ventilating System.  Air Conditioning System Shall Be Provided In All Patient’s Private Rooms, Operating Rooms, Delivery Rooms, Offices And Other Areas Where Conditioned Air Is Necessary.  Cooling Load Calculations Report Shall Be Manual Or Computer Generated, Hourly Analysis Program Which Includes Heat Transmission Coefficients, Solar Heat Gain Factors And Corrected Cooling Load Temperature Difference Calculations.  Split Type Air Conditioners Will Be Used At Areas With Larger Capacities.  Window Type Air Conditioners Shall Be Used In Areas With Exterior Wall Exposure.  Centralized Air Conditioning Will Be Used As Indicated On Space Requirements (e.g. Sterile Hallways).  Maintain An Air Change Rate Greater Than Or Equal To 12 Air Changes Per Hour Or 145 Liters Per Second Per Patient.  Ceiling Cassette Type Exhaust Fans With Integral Air Diffuser Shall Be Provided In All Toilets.  Ceiling Fans, Orbit Type With 360° Oscillation Shall Be Provided In All Non-air-conditioned Rooms, As Mentioned On Space Requirements. D. Specific Requirements  Provide Details Of The Following: 1. Lpg Pipeline 2. Kitchenhood And Smokestack E. Summary Of Materials 1. Automatic Fire Sprinkler System A. The Fire Pump Shall Be Ul Listed/fm Approved, Diesel Engine Or Electric Motor Driven, Designed Specifically Intended For An Automatic Water Sprinkler Protection System. B. The Jockey Pump Shall Be Ul Listed/fm Approved, Electric Motor Driven, 220v, 3-phase, 60 Hertz, And Electric Power Connection. C. Sprinkler Head Shall Be Ul Listed/fm Approved, Pendant, Upright Or Sidewall Unit, 83 Lpm Flow Capacity Per Head And Temperature Fusing At 57.5° C To 74°c. D. The Alarm Assembly Shall Be Ul Listed/fm Approved, Constructed And Installed That Any Flow Of Water From The Sprinkler System Equal To Or Greater Than That From The Single Automatic Head Shall Result In An Audible And Visual Sign In The Vicinity Of The Building. E. Alarm And Supervision System Of The Automatic Water Sprinkler Shall Include The Monitoring Water Flow Switch At Each Floor Of The Building, Fire Pump And Jockey Pump Running Condition And Power Supplies, Level Of Water In The Reservoir And Control Valves. F. Pipes Shall Be B.i. Schedule 40. Screw Fittings Shall Be Used For Inside Piping. 2. Air Conditioning And Refrigeration System A. Refrigerant Pipes Shall Be Copper Tubing, Type L Or K Black Steel Pipe, Schedule 40 For Size Of 100mm Diameter And Smaller. Pipe Over 100mm Shall Be Black Steel Pipe Schedule 40. B. Black Steel Pipes Shall Be Standard Seamless, Lap-welded, Or Electric Resistant Welded For Size Of 50mm Diameter And Larger, Screw Type For Size 38mm Diameter And Smaller, Fittings For Copper Tubing Shall Be Cast Bronze Fitting Designed Expressly For Brazing. C. Pipe Insulation Shall Be Performed Fiberglass Or Its Equivalent. The Insulating Materials Shall Be Covered With 100mm X. 13mm Thick Polyethelene Film, Which Shall Be Overlapped Not Less Than 50mm. D. Ducts Shall Be Galvanized Sheet Steel Of Standard Gauges. E. Ductwork Insulation Materials Shall Be Rigid Board Made Of Styropor Or Equivalent 25mm Thick For Ground And Top Floor, 13mm Thick For Intermediate Floor. -end Of Mechanical Works Design Parameters- Xviii. Design Parameters (electrical/auxiliary Works) A. Codes And Standards The Electrical System Design Parameters Shall Be In Accordance With The Following Codes And Standards.  Codes: 1. Philippine Electrical Code 2. National Electrical Code 3. Fire Code Of The Philippines 4. National Building Code Of The Philippines And Its New Irr 5. Existing Local Codes And Ordinances  Standards: 1. Bureau Of Product Standards (bps) 2. Underwriters Laboratory (ul) 3. National Fire Protection Association 4. International Electrotechnical Commission (iec) 5. Illumination Engineering Society (ies) 6. National Electrical Manufacturer’s Association (nema) 7. Doh Manual On Technical Guidelines For Hospital And Health Facilities Planning And Design B. Building Facilities Electrical System 1. Lighting System  Provide And Install Adequate Normal Branch Circuits For Lighting System To All Areas Using The Standard Lighting Design Analysis. Utilize The Standard Illumination Requirements Per Area Of Concern Using The Preferred Particular Type Of Luminaires. 2. Power System  Provide And Install Adequate Normal Branch Circuits For The Power System. 3. Standby/emergency System  Provide And Install Adequate Life Safety And Critical Emergency Branch Circuits For Lighting Or Utilization Equipment Connected To The Alternate Power Source. 4. Auxiliary System Provide And Install The Following Auxiliary System:  Communication System A. Telephone System B. Local Area Network System C. Public Address Paging System D. Private Branch Exchange (pabx) E. Master Or Cable Antenna Television  Fire Alarm System  Security System 5. Lightning Protection System  The Building Lightning Protection System Shall Include Roof-mounted Air Terminals Grounding Conductors, Ground Rods, Conduits, Clamps, And Auxiliary Equipment As Required For A Complete And Operational Lightning Protection System. 6. Provide Details Of The Following:  Lighting Fixtures/luminaires  Panelboard And Circuit Breakers  Switchgear And Other Metering Devices  Electrical And Hospital Equipment  Installation And Termination Of Auxiliary And Other Special Devices And Equipment  Power And Telephone Handholes (as May Be Required)  Pedestal And Service Entrance To Bldg.  Grounding System Layout  Substation/power House And Electrical Room  Transformer And Generator Mounting  Others As May Be Required. C. Summary Of Materials  General Lighting Luminaries: Fixtures Type Shall Be As Indicated On The Lighting Layout Plan. 1. Fluorescent Lamp Shall Be Linear, Circular Or Self-ballasted Compact Fluorescent Lamps. 2. Fluorescent Lamps Shall Be Cool Or Warm White And 3. Lamp Holders Shall Be Made Of Thermosetting Plastic. 4. Fluorescent Ballast: Magnetic Or Electronic Type With High Power Factor Or High Frequency Energy Saving Type. 5. Fluorescent Fixture Housing Shall Be Steel Sheet With High Reflectance Powder Coat Paint Finish. 6. Downlights And Pin Lights Shall Be Of Heavy Gauge Spun Aluminum Equipped With Lamp As Indicated On The Drawings. 7. Other Special Lighting Requirements Shall Be As Approved By The Implementing Agency. 8. Sterile Areas/zones Lighting Specifications: A. Type: Use Sealed, Recessed, Or Surface-mounted Led Fixtures That Are Flush With The Ceiling Surface To Prevent Dust Accumulation. B. Lux Level: Aim For 300-500 Lux For General Sterile Areas; 1000 Lux Or More May Be Needed In Surgical Suites Or Examination Zones Or As Specified On Manual Of Technical Guidelines For Hospital Planning And Design (level 3)  Wiring Devices: Wiring Devices Shall Be Non-automatic Control Devices, The Contact Is Guaranteed By The Pressure Of The Special Spiral Springs. 1. Switches Shall Be Of 15a, 250v Or 300v Except As Otherwise Noted And Approved. Terminals Shall Be Screw-type Or Quick-connected Type. 2. General Use Receptacle Shall Be 15a, 240v Grounding Type Unless Otherwise Indicated On The Drawings. 3. Special Purpose Receptacles Shall Be As Called For On The Drawings. 4. Matching Plugs Shall Be Supplied.  Panelboards And Circuit Breakers: The Panelboard And Circuit Breakers Shall Be Equipped With Molded-case Circuit Breakers And Shall Be The Type As Indicated In The Panelboard Schedule And Details. 1. Provide Molded-case Circuit Breakers Of Frame, Trip Rating And Interrupting Capacity As Shown On The Drawings. The Circuit Breakers Shall Be Quick-make, Quick Break, Thermal-magnetic, Trip-indicating And Shall Have Common Trip On All Multiple Breakers With Internal Trip Mechanism. 2. All Current-carrying Parts Of The Panelboards Shall Be Plated. Provide Solid Neutral (s/n) Assembly When Required. The Assembly Shall Be Isolated From The Enclosure.  Electrical Conduits, Boxes And Fittings: All Conduits, Boxes And Fittings Shall Be Standard Rigid Steel, Zinc Coated Or Galvanized. 1. Rigid Steel Conduits (rsc) 2. Rigid Metal Conduits (rmc) 3. Intermediate Metal Conduits (imc) 4. Electrical Metallic Tubing (emt) 5. Unplasticized Polyvinyl Chloride (upvc) If Required Shall Be Schedule 40.  Conductors: Wires And Cables Shall Be Of The Approved Type And Unless Specified Or Indicated Otherwise, All Power And Lighting Conductors Shall Be Insulated For 600 Volts. 1. The Conductors Used In The Wiring System Shall Be Of Soft-annealed Copper Having A Conductivity Of Not Less Than 98% Of That Of Pure Copper And Insulated For 60° C Temperatures. 2. All Conduits Of Convenience Outlets And Wire-ways For Lighting Branch Circuit Home-runs Shall Be Wired With A Minimum Of 3.5 Mm Square In Size.  Master Antenna Television (matv) And Cable Television (catv) System: 1. Two Sources Of Tv Signals Shall Be Provided To The Building. One (1) Shall Be From A Master Antenna Installed At The Roof Or Within A Suitable Area Of The Building And The Other Will Be From A Commercial Cable Television Service. 2. The Master Antenna System Shall Consist Of Fm, Vhf And Uhf Antennas, Combiner, Distribution Amplifier, Coaxial Cables, Splitters, Tap-offs And Tv Outlets. 3. There Shall Be Individual Trunking For Master Antenna And Cable Television Rising In The Building.  Structured Cabling & Telephone System: 1. A Minimum Provision For Estimated 500 Mixed Pabx Extension And Direct Telephone Lines Shall Be Required For Tertiary Hospitals. 2. Final Details Of The System Shall Follow Specific Requirements, Quantity And Type Of Service.  Fire Detection And Alarm System: 1. The Fire Detection And Alarm System Shall Be Of Multiplex, Microprocessor- Controlled Addressable Or Zonal Conventional Fire Detection, Alarm And Communication System. 2. The System Shall Consist Of Full Integration Automatic Fire Detection, Voice Alarm Communication And Fire Fighters Telephone System. 3. The System Shall Consist Of Control Station, Mimic Panel Initiating And Indicating Devices, Control Modules And System Of Wirings. 4. Actuation Of The Protective Signaling System Shall Occur By Manual Pull Station, Automatic Smoke Or Heat Detector, Sprinkler Flow Switch And Tamper Switch. 5. The System Shall Be Able To Monitors The Status Of Flow Switches And Supervisory Switches Installed At The Sprinkler System Risers. These Monitoring Points Are Also Addressable Or The Conventional Zonal In The Same Way As The Detectors Are Making Them Easily Recognizable At The Control Panel. 6. Occupant Notification Shall Be Accomplished Automatically. Notification Will Be General, Audible Alarm Type Complying With Appropriate Section Of Nfpa. 7. The System Shall Be Installed With Provisions For Future Connection To The Nearest Fire Services Station In The Locality.  Security System: 1. The Security System Shall Include Intrusion Detection And Alarm, Cctv, Access Control Or As Maybe Required.  Ventilation And Air Conditioning System The Ventilation And Air Conditioning System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. General Notes, Legends And Symbols Including Schematic Diagram Of The Ventilation And Air Conditioning System. 2. Floor Layout Of The Ventilation And Air Conditioning System Indicating The Capacity And Location Of The Air Conditioners And Fans. 3. Duct Layout Indicating Duct Sizes, Route And Location Of The Dampers, Diffusers, Return Air Register, Hangers And Sway Braces. 4. Refrigerant Piping Layout Indicating Pipe Sizes, Location Of Valves, Hangers And Sway Braces. 5. Equipment Schedule And Details Drawings Of Air Conditioners And Ventilating System. A) Air Conditioning System Shall Be Provided In All Patient’s Private Rooms, Radiologic And Imaging Area, Operating Rooms, Delivery Rooms, Laboratories, Critical Care Areas, Offices And Other Areas Where Conditioned Air Is Necessary. B) Cooling Load Calculations Report Shall Be Manual Or Computer Generated, Hourly Analysis Program Which Includes Heat Transmission Coefficients, Solar Heat Gain Factors And Corrected Cooling Load Temperature Difference Calculations. C) Split Type Air Conditioners Will Be Used At Areas With Larger Capacities. D) Window Type Air Conditioners Shall Be Used In Areas With Exterior Wall Exposure. E) Centralized Air Conditioning Will Be Used Only If Feasible. F) Design Of All Critical Areas Shall Be Laminar Or Positive Pressure, Wherein The Supply Air Is 10% More Than Exhaust Air. G) All Infectious Isolation Rooms, Such As Tb And Sars, Shall Be Negative Pressure, Wherein The Exhaust Air Is More Than 10% Of The Supply Air. H) Maintain An Air Change Rate Greater Than Or Equal To 12 Air Changes Per Hour Or 145 Liters Per Second Per Patient. I) Ceiling Cassette Type Exhaust Fans With Integral Air Diffuser Shall Be Provided In All Toilets. J) Ceiling Fans, Orbit Type With 360° Oscillation Shall Be Provided In All Non-air-conditioned Rooms, Such As Patient Wards, Work Areas, Etc.  Air Conditioning And Refrigeration System 1. Refrigerant Pipes Shall Be Copper Tubing, Type L Or K Black Steel Pipe, Schedule 40 For Size Of 100mm Diameter And Smaller. Pipe Over 100mm Shall Be Black Steel Pipe Schedule 40. 2. Black Steel Pipes Shall Be Standard Seamless, Lap-welded, Or Electric Resistant Welded For Size Of 50mm Diameter And Larger, Screw Type For Size 38mm Diameter And Smaller, Fittings For Copper Tubing Shall Be Cast Bronze Fitting Designed Expressly For Brazing. 3. Pipe Insulation Shall Be Performed Fiberglass Or Its Equivalent. The Insulating Materials Shall Be Covered With 100mm X. 13mm Thick Polyethylene Film, Which Shall Be Overlapped Not Less Than 50mm. 4. Ducts Shall Be Galvanized Sheet Steel Of Standard Gauges. 5. Ductwork Insulation Materials Shall Be Rigid Board Made Of Styropor Or Equivalent 25mm Thick For Ground And Top Floor, 13mm Thick For Intermediate Floor. -end Of Electrical Works Design Parameters- Xix. Design Parameters (green And Safe Health Facilities)  Codes And Standards Green And Safe Health Facilities Shall Be In Accordance With The Following Laws, Codes And Standards.  Global Initiatives & Developments: 1. World Health Assembly Resolution On Universal Health Care (2019) 2. World Health Resolution On Climate Change And Health (2008) 3. Un Resolution On Sustainable Development Goals (2015) 4. Global Action On Patients’ Safety  Laws And Codes: 1. Sanitation Code Of The Philippines Irr Of Chapter Xvii 2. The Local Government Code Of 1991 3. Clean Water Act Of 2004 4. National Building Code Of The Philippines (pd 1096) 5. General Appropriation Act Fiscal Year 2021 (ra 11518) 6. Occupational Safety And Health (ra 11058) 7. Safe Hospital Initiative (2011) 8. Universal Health Care Act (ra 11285) 9. Implementing Rules And Regulations Of Accessibility Law (ra 344) 10. Ecological Solid Waste Management Act Of 2000 (ra 9003) 11. Climate Change Act Of 2009 (ra 9729) 12. Other Related Standards A. Guidelines The Green And Safe Hf Initiative Represents A Climate Smart Paradigm Shift, Away From Traditional Disaster Response To One That Proactively Seeks To Minimize The Health Impact Of Disasters And Emergencies Through Climate Adaptation And Mitigation Measures (including Climate-proofing And Reduction Of The Environmental Footprint), And Preparedness. Consequently, It Is Essential That This Green Manual Is Incorporated Into The Hospital And Hf Development Agenda That Are Backed With Earmarked Resources In The National Budget, And That Has Governance And Support From The Highest Levels Of Government.  The Department Of Health Shall, As Much As Possible, Promote The Greening Of Hospitals And Health Facilities, Including The Improvement Of Energy And Water Efficiency And Conservation, Sustainable Cooling Systems, And Sustainable Healthcare Waste Management In Hospitals.  In Line With Its Continuing Efforts In Green And Safe Hfs, The Doh Shall Encourage National And Local Government Hospitals And Other Hfs To Seek Green Certifications From Green Building Rating System/s For Their New Construction Or Expansion, Repair And Renovation Projects. B. Criteria And Compliance System For Outstanding Green And Safe (climate Smart) Health Facilities.  Criterion Compliance 1. Governance – Leadership And Management, Trainings, Proper Implementation, Commitment 2. Energy Efficiency – Reduction Of Energy Consumption, Use Of Renewable And Clean Energies 3. Water Efficiency, Sanitation And Hygiene – Adequate Water, Water Reuse/recycling, Water Conservation, Rainwater Harvesting. Safe Drinking Water, Proper Use And Maintenance Of Sanitary Toilet Facilities 4. Health Care Waste Management Waste – Segregation, Collection, Storage, Transport, Treatment, Proper Waste Disposal, Recycling 5. Environmentally Resilient Health Facility – Structural Member, Non-structural Member, Emergency And Disaster Preparedness Plan 6. Site Sustainability – Healing Gardens Within, Fresh Air, Herbal Plants, Accessibility, Existence Of Alternative Routes 7. Material Sustainability – Use Of Sustainable Materials, Procurement Of Sustainable And Recyclable Products, Less Use Of Hazardous And Toxic Substances 8. Indoor Environmental Quality – Lighting, Ventilation, Interior Design, Air Quality Management C. Energy Efficiency  Orientate Building & Façade Design To Mitigate Heat Gain. The East And West Facades Receive The Greatest Solar Radiation, And Should Be Designed To Avoid Direct Sun.  Use Of Glass/glazing With A Lower U-value And Shading Coefficient Reduce Solar Heat Gain.  Allow Provision For Easy Access For Maintenance And Cleaning Especially For Curtain Wall System.  Consider Lifespan, Durability And Life Cycle-costing When Selecting Façade Materials.  Install And Use Energy-efficient Lighting Fixtures I.e. Led, Cfl, Slim Type Fluorescent, Etc.  Skylights (if Applicable) And Windows To Maximize Natural Lighting And Ventilation On Selected Areas. Utilizing Daylight As Possible.  Use Of Appliance With Inverter Technology With Variable Frequency Drive Technology.  Window And Door Assemblies Shall Have Complete Gaskets, Weather Stripping, Door Bottom Sweeps And Seals.  All Operable Windows Shall Be Provided With Safety Features For Protection Against Strong Winds, Water Penetration And Protection For Building Occupants Including Child Safety And Security.  Specific Air Exchange Rates Are Usually Attained Through Artificial Ventilation. Adequate Ventilation Throughout The Facility Contributes To Maintaining A Hygienic Environment. Presence Of Functional Windows And Doors, That Allow At Least 6-8 Air Changes Per Hour For Natural Ventilation. For Airborne Infection Isolation Room/s And Er/triage Areas, Greater Or More Than 12 Air Changes Per Hour Is Recommended, While Up To 15 Air Changes Per Hour May Be Recommended For Operating Procedure, Or Delivery Rooms.  Light-colored Building Envelopes Is Also Recommended To Reduce Heat Transfer From The Outside To Inside Of The Building By Having Surfaces With High Solar Reflectance Index (sri). D. Water Efficiency, Sanitation And Hygiene  Optimize Water Conservation Through Installation Of Rainwater Harvesting Cistern Tank  Use Of Waterless Urinals And Dual Flush Water Closets.  Use Of Low-flow & Water Efficient Faucet And Hand-held Bidets.  Use Of Water-saving Shower Heads  For Hospitals, There Must Be At Least One Water Closet For Every Eight Patients In Compliance With Ra 4226 – Hospital Licensure Act.  A Separate Toilet For Male And Female Is Preferred, And Shall Be Pwd Accessible. And, A Separate Toilet For The Staff, With A Provision Of One Toilet For Every Fifteen Personnel Shall Be Applied.  Waterless Urinals Must Be Provided For Male Toilets.  There Should Be Sufficient And Functional Hand-washing Facilities. E. Environmentally Resilient Health Facility  Ground Floor Must Be Above Ground Line And Anticipated Flood Level. F. Material Sustainability  Building Materials, If Applicable, Must Be Locally Sourced To Minimize Carbon Footprint.  Rapidly Renewable And Sustainable Materials Are Also Recommended. Refer To Sec. 16.3.4 Of Doh Green And Safe Health Facilities Manual For List Of Sustainable Construction Materials That Can Be Used.  Use Of Materials (specifically Wet-applied Materials) That Are Low In Vocs (volatile Organic Compounds) G. Site Sustainability  Adopt The Development Controls Indicated In The National Building Code Of The Philippines To Establish The Extent Of The Health Facility Site Can Develop.  Biophilic Design Is Recommended To Help Reduce Stress, Improve Cognitive Function And Creativity, Improve Patients’ Well-being And Expedite Healing.  Porous Pavement Is Recommended At The Site Development To Alleviate Flooding. Landscape Swales Is Also One Solution. H. Indoor Environmental Quality  Harvest Natural Daylight If Applicable.  Acoustic Quality, Especially In Areas/rooms That Needs To Be Soundproofed, Shall Be Maintained.  Use Of Acoustic Privacy Partitions Is Required.  Separate Entrances For Ambulances And Walk-in Patients.  In Procedure Rooms With Windowless Areas, Backlit Photomurals Or Artificially Illuminated Glass Artwork Can Alleviate Feeling Of Claustrophobia.  In Wards And Recovery Rooms, Provide Windows And Natural Illumination As Much As Possible.  Provide Acoustic Privacy In Patient Rooms, Offices, And Examination Rooms With Partitions Of Sound Transmission Class (stc) Of 45.  Noise Level In The Operational Rooms Must Follow The Minimum Noise Standards In Accordance To The Doh Manual Of The Technical Guidelines For Hospital Planning And Design (level 3) Drawing Requirements: See Doh Standard Checklist Based On Revised Irr Of The National Building Code Of The Philippines (pd 1096). Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation. -end Of Green And Safe Health Facilities Design Parameters- Xx. Build Aspect Furnish Labour, Materials, Equipment, Paint, Tools And Other Facilities To Complete The Entire Building Including Architectural, Structural/ Civil, Electrical, Mechanical, Sanitary, Communication, Fire Protection, And Other Related Works To Complete The Scope As Specified And/or As Shown On Drawings And Plans 1. General Requirement  Contractor’s Temporary Facility And Lay Down Yard.  Communication And Transmittal, Reproduction, Tarpaulin/billboard And Photos  Material Testing (rsb, Chb, Concrete, Steel)  Safety Requirements (warning Signs, Hardhat, Etc.)  As Built Plan  Demolition, Clearing Work, Permits And Licenses 2. Other Items Of Work  Demolition Of Existing Structures In Affected Areas Or Where The Proposed Project Shall Be Situated, Clearing And Disposal Of All Debris Generated During Construction.  All Serviceable Materials Shall Be Turn Over To Doh-dedvmh Through Its Representative  Soil Excavation And Soil Treatment  Restoration Of Any Damaged Properties During The Construction  Permit Fees, And Other Necessary Documents For The Project Shall Be Shouldered By The Contractor  Temporary Facilities Shall Be Provided During The Construction Period, To Be Constructed Within The Hospital Compound, Which Shall Serve As The Field Office, Storage Of Materials And Bunkhouse For The Workers.  No Implementation Of The Project Without An Approved Plan And Other Related Documents.  Strict Implementation Of (dole Guidelines And Other Standards Applicable) Health And Safety Rules.  Shall Abide By The Medical Center Hospital House Rules  Conduct Weekly Progress And Coordinative Report To The Agency Or Its Representative  Other Items Of Work Not Mentioned Herewith But It Is Very Necessary For Execution And Completion Or Works Shall Be Included And Charge To The Contractor 3. Pre-installation Requirements  All Tests To Be Conducted Shall Be Witnessed By The Hospital Representatives.  Soil Investigation  Concrete Strength Testing  Reinforcing Bar Strength Testing  Concrete Masonry Unit (cmu) Testing  All Plumbing And Sanitary System  Automatic Fire Sprinkler System  Ventilation And Air Conditioning System  All Electrical System  And Other Tests That Necessary To Perform To Ensure The Quality Of The Project  All Certifications And Reports Under Post-installation Requirement Shall Be Submitted To The Hospital Representatives.  The Contractor Shall Submit A Sample Of Materials For Approval Of The Medical Center Chief Prior To Installation.  No Implementation Or Execution Of Work In Any Discipline Without The Approval Of Medical Center Chief Or Through Its Representative  Any Request For Inspection, Approval, Concrete Pouring, Testing And Commissioning Must Be Address To Medical Center Chief Or Must Adhere To The Reporting Protocol As Mentioned Above. -end Of Build Aspect- Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Architectural Drawings (as Applicable) A – 1 (a…n) Perspective, Site Development Plan, Vicinity Map/location Plan (2.00 Kms. Radius) Table Of Contents A – 2 (a…n) Floor Plans (scale 1:100m Minimum) Including Furniture Layout When Necessary A – 3 (a…n) Four (4) Elevations (scale 1:100m Minimum) A – 4 (a…n) Two (2) Sections (scale 1:100m Minimum) Including Spot Details When Necessary A – 5 (a…n) Roof Plan/s Showing Downspouts (scale 1:100m Minimum), Including Detail Of Gutter, Downspout, Etc. A – 6 (a…n) Reflected Ceiling Plan/s (scale 1:100m Minimum), Including Details A – 7 (a…n) Details Of Stairs, Fire Escapes/exits, Accessible Ramps, Etc. (scale 1:50m), Including Details Of Railings, Treads, Risers, Etc., In The Form Of Plans, Elevation/section A – 8 (a…n) Details Of Toilets (1:50 M) Including Accessible Toilets In The Form Of Plans, Elevation/section A – 9 (a…n) Details Of Specialized Design Features (scale 1:50 M) Such As Partitions, Cabinets, Etc. And Accessible Design Features A – 10 (a…n) Detail Of Typical Bay Section From Ground To Roof (scale 1:50 M) A – 11 (a…n) Details Of Special Elevations/section Rooms (1:50m) In Form Of Plans, A – 12 (a…n) Schedule Of Doors, Gates, Emergency Exits, Etc. (scale 1:50 M), Including Specifications For Materials And Hardware A – 13 (a…n) Schedule Of Windows (scale 1:50 M), Including Specifications For Materials And Hardware A – 14 (a…n) Schedule Of Finishes For Interior And Exterior Floors, Walls, Ceilings Architectural Technical Specifications Architectural Scope Of Works Architectural Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 1 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Architectural Interior Design Drawings (as Applicable) Aid – 1 (a…n) Floor Plans Showing Layout Of Floor Finishes (scale 1:100m Minimum) Aid – 2 (a…n) Floor Plans Showing Layout Of Furniture/finishing Partitions, Cabinets, Etc. (scale 1:100m Minimum) Aid – 3 (a…n) Interior Elevations And Sections Showing Wall Patterns, Ceiling Sections, Etc. (scale 1:100m Minimum) Aid – 4 (a…n) Details Of Partitions, Cabinets, Furniture, Ceiling And Other Interior Design Features (scale 1:100m Minimum) Aid – 5 (a…n) Architectural Interior Perspective/s Architectural Interior Design Technical Specifications Architectural Interior Design Scope Of Works Architectural Interior Design Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 2 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Structural Drawings (as Applicable) S – 1 (a…n) General Notes And Construction Standards S – 2 (a…n) Site Development Plan S – 3 (a…n) Foundation Plan/s (scale 1:100m Minimum) S – 4 (a…n) Floor Framing Plan/s (scale 1:100m Minimum) S – 5 (a…n) Roof Framing Plan (scale 1:100m Minimum) S – 6 (a…n) Schedule And Detail Of Footings And Columns S – 7 (a…n) Schedule And Detail Of Beams And Floor Slabs S – 8 (a…n) Detail Of Trusses S – 9 (a…n) Details Of Stairs, Ramps, Fire Exits S – 10 (a…n) Other Spot Details Structural Analysis And Design (for 2 Storey Building And Higher) Boring And Land Test Results (for 3 Storey Building And Higher) Seismic Analysis Structural Technical Specifications Structural Scope Of Works Structural Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 3 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Electrical Drawings (as Applicable) E – 1 (a…n) General Notes And Legends E – 2 (a…n) Location And Site Plan E – 3 (a…n) Lighting Layout (scale 1:100m Minimum) Including Details E – 4 (a…n) Power Layout (scale 1:100m Minimum) Including Details E – 5 (a…n) Auxiliary System Layout (scale 1:100m Minimum) Including E – 6 (a…n) Schedule And Detail Of Loads E – 7 (a…n) Riser Diagram E – 8 (a…n) Other Detail Electrical Computation Design Analysis Electrical Technical Specifications Electrical Scope Of Works Electrical Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 4 Of 6 Electronics/auxiliary System Ready For Integrated Communications 1. Telephone System 2. Paging System 3. Lan System 4. Fire Alarm System 5. Security System Cctv 6. Integrated Communications And Systems Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Plumbing/sanitary Drawings (as Applicable) P – 1 (a…n) General Notes And Legends P – 2 (a…n) Location And Site Plan P – 3 (a…n) Storm Drainage Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line To Main Drainage Line P – 4 (a…n) Waterline Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line From Main Water Source When Applicable P – 5 (a…n) Sewerline Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line To Septic Tank Or Existing Sewerline P – 6 (a…n) Isometric Layout, Showing Waterline, Sewerline And Drainage Line P – 7 (a…n) Detail Of Connections, Catch Basins, Downspouts, Etc. P – 8 (a…n) Detail Of Septic Tank/sewer Treatment Plant Design Analysis Sanitary Technical Specifications Sanitary Scope Of Works Sanitary Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 5 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Mechanical Drawings (as Applicable) M – 1 (a…n) General Notes And Legends, Site Development Plan, Location Plans M – 2 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Showing Ventilation And Air Conditioning Systems And Other Installations M – 3 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Gas Pipeline System And Details M – 4 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Air-conditioning Systems And Details M – 5 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Fire Suppression Systems, Fire Sprinkler System, Wet Stand Pipe, Dry Standpipe And Other Installation M – 6 (a…n) Details Water Tank, Flow Diagram (scale 1:50m) M – 7 (a…n) Details Of Firewater Supply Sytem (scale 1:50m) M – 8 (a…n) Detail Of Elevators, Escalators, Dumbwaiters, Etc. (scale 1:50m) M – 9 (a…n) Detail Of Other Machinery/equipment (scale 1:50) M – 10 (a…n) Longitudinal And Transverse Section Of Building (scale 1:100m) Showing Manner Of Support Of Machines/equipment Mechanical Technical Specifications Mechanical Scope Of Works Mechanical Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 6 Of 6 General Guidelines • All Construction Works Shall Be Undertaken By Contractor In Accordance With Existing Laws And All Other Applicable Rules And Regulations. • The Contractor Shall Be Responsible In Setting Out Reference Lines, Elevations (lines And Grades) Prior And During The Execution Of The Works. All References Shall Be Maintained And Protected By The Contractor At His Own Expense. Disturbed References Shall Be Restored To Its Original Position Without Extra Cost To Devmh. • The Contractor Shall Carry Out The Works Properly And In Accordance With This Contract. The Contractor Shall Provide All Supervision, Labor, Materials, Plant And Equipment, Which May Be Required. • The Contractor Shall Commence Execution Of The Works On The Start Date And Shall Carry Out The Works In Accordance With The Approved Pert/cpm Network Diagram Submitted By The Contractor, As Updated With The Approval Of The Procuring Entity’s Representative, And Shall Complete The Works By The Intended Completion Date. • The Contractor Shall Be Responsible For The Safety Of All Activities On The Site. • During On-going Construction And Before The Turn-over Of The Project, Engineering & Facilities Management Staff, End-users, Twg And Bac Shall Inspect The Works Undertaken By Contractor. Hospital Engineers And End-users Discover Any Deviations By Contractor From The Approved Construction Plans, Contractor Shall Be Required To Rectify All Such Deviations, Within Such Period Required By Client. • Contractor Shall Have Full Responsibility For Any And All Damages To Existing Hospital Facilities, Utilities, And/or Any Portion Of The Hospital’s Common Area, Due To The Works Undertaken By Contractor, Whether Accidental Or Intentional. • No Variation Order Shall Be Undertaken Unless Verified By Hospital Engineer And Approved By Executive Committee. • Contractor Shall Not Cover Or Block Stub-outs (cleanouts, Water Source, Exhaust, Sewer, Drainage, Etc.) When Not Utilized. Said Stub-outs Shall At All Times Be Free Of Obstructions And Easily Accessible. • Contractor Shall Secure A Utility Tapping Permit Prior To Tapping From Utility Provision. • Electricity And Water Consumed During Construction Shall Be Charged To Contractor. • End-users Reserves The Right To Inspect The Works At Any Time. • Contractor Shall Insure And Hold Client, Its Affiliates, Officers, Directors, Stockholders, Employees, Agents, And/or Representatives, Free And Harmless From And Against Any Injury, Losses, Claims, Damages, Liabilities, Expenses, And/or Costs Of Litigation, Resulting From Or Arising Out Of The Works Undertaken By Contractor. • In Event Of Force Majeure, The Contractor Shall Rectify, Replace Or Build The Unfinished Projects When It Is Not Yet Completed And Accepted W/o Additional Cost For The Procuring Entity. • Contractor Shall Comply With The Construction House Rules Of This Hospital.
Closing Date11 Mar 2025
Tender AmountPHP 15 Million (USD 259.2 K)

Department Of Loz Re Tender

Others
France
Description: Supply of work clothes, safety shoes and personal protective equipment for departmental agents (6 lots)
Closing Date24 Mar 2025
Tender AmountRefer Documents 

Istanbul Environmental Management San. and Tic. Tender

Civil And Construction...+1Civil Works Others
Turkey
Description: Work Shoes Purchase Business
Closing Date12 Mar 2025
Tender AmountRefer Documents 

Aerospace and Aviation Industry Anonymous Network (HEAS) Tender

Civil And Construction...+1Civil Works Others
Turkey
Description: Summer and Winter Work Shoes
Closing Soon6 Mar 2025
Tender AmountRefer Documents 

Indian Army Tender

Goods
GEM
India
Description: CATEGORY: Acrylic Sheet Black colour , Shoes Rack , Yuri Direction Finder , Hanger , Colin
Closing Date12 Mar 2025
Tender AmountRefer Documents 

Indian Army Tender

Goods
Automobiles and Auto Parts
GEM
India
Description: CATEGORY: Frt Brake Shoe RE , Rear Brake Shoe RE , Chain Sprocket RE , ACC Cable Assy RE , Clutch Cable Assy RE , Speedo Drive Gear RE , Front Wheel Brg RE , Rear Wheel Brg RE , Gear Box Oil Seal Tata , Differential Oil Seal ALS , Needle Brg MG , Field Coil Assy ALS , Oil Filter SML , Fuel Filter SML , Cabin Pump Lift T815 , Brake Field Container Tata
Closing Date13 Mar 2025
Tender AmountRefer Documents 

Indian Council Of Medical Research - ICMR Tender

Goods
Healthcare and Medicine
GEM
India
Description: CATEGORY: Dispovan 5 ml Syringes , Face Mask Disp , 2 ml Plastic Syringe with Needle , Nitrile Gloves , Sterillium , Bio hazard Bags , Shoe Cover PE Plastic , Face Shield
Closing Date13 Mar 2025
Tender AmountINR 755.8 K (USD 8.7 K)

Department Of Public Works And Highways - DPWH Tender

Machinery and Tools...+1Automobiles and Auto Parts
Philippines
Details: Description For Use In H1-6076 (lgh-805) Battery 12v, 11 Plates Brake Pad Brake Shoe For Use In H1-5818 (skx-754) Battery 12v, 11 Plates For Use In H1-6435 (b2-g379) Brake Pad Butterfly, Swing Arm For Use In H1-6048 (lgj-121) Battery 12v, 11 Plates Tires 265/65, R16 Brake Pad For Use In H1-5726 (lag-372) Tires 235/75, R15 Battery 12v, 11 Plates Outside Job Order To Supply Materials For The Repair Of Transmission Assembly Of 1 Unit Toyota Landcruiser 1.) Pull-out Of Damaged Transmission Assembly 2.) Inspection/checking Of Worn-out Parts 3.) Installation Of Brand-new Clutch Assembly Include, Clutch Disc, Clutch Pressure Plate And Release Bearing 4.) Reassembling Of The Transmission Assembly 5.) Road Testing Of 1 Unit Toyota Landcruiser For Use In H3-6505 (sks-130) Battery 12v, 21 Plates Tires 10.00x20.00 Inner Tubes, 10.00x20.00 Flaps For Use In H3-6755 (sab-6094) Battery 12v, 21 Plates Adblue (diesel Exhaust Fluid) Tires 11x22.5 Tubeless For Use In H3-6916 (nbq-8664) Battery 12v, 21 Plates Adblue (diesel Exhaust Fluid) For Use In H3-7025 (j0-g023) Battery 12v, 11 Plates For Use In F17-112 Battery 12v, 21 Plates For Use In N1-2110 Battery 12v, 21 Plates Tires 11.00x20.00 Inner Tubes, 11.00x20.00 Flaps For Use In N1-2140 Battery 12v, 21 Plates Tires 11.00x20.00 Inner Tubes, 11.00x20.00 Flaps For Use In Z18-460 Battery 12v, 11 Plates For Use In Area Shop Oxygen (for Fabrication Use) Acetylene (for Fabrication Use) Welding Rod Hacksaw Blade Xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
Closing Date11 Mar 2025
Tender AmountPHP 1 Million (USD 17.2 K)

Indian Army Tender

Goods
Textile, Apparel and Footwear
GEM
India
Description: CATEGORY: High Lumens durable head Lamp 8000M , Polartec Body Hugging Breathable Balclava , Fabric Body Snug fit warm hat 8000M , Polycarbonate Lens UAV UVB Protector 3D Fully adjustable for 8000M , Highly protected anti fogging ventilation system photochromic lense , Upper Perfect Baselayer extreme cold polyster and elastane fabric , Lower Perfect Baselayer extreme cold polyster and elastane fabric , Double Layer high level warmth body fabric and nylon insulated 800 fill down suit , Thermal Efficiency insulation Jacket Down , Softshell Jacket coating 100 percentage polyster Hook and loop adjustment , Trekking Pant Lite DWR Finish high abrasion resistance , Elastane fabric Trekking pant Breathable , Ice Tappered web adjustable range 8000M , Cutting edge climbing ascender , Dynamic Anti balling light weight universal crampons 8000M , Ice Screw with front teeth aluminium alloy lever 8000M , Extreme Weather protecting waterproof space station with standing pole , Space Station 10 M above 8000M , Large Figure Descender , Polyamide PFC free foot support cable , Lightweight polyurethane compact Dimension mattress , Bag Pack high volume cap 70 Ltr 8000M peak , BPA free dehydration pack safety wash cap 8000M , Outdoor Piezo ignition system , Dynamic rope elongation threads , Triple rated single force impact dynamic elongation rope , Vibram Dynamic TRK sole high durable trekking shoes 8000M , Chest Ascender , Climbing shoes high cut upper, insole bi- density Velcro fastening 8000M , Metallised embossed pneumatic mattress 8000M , Double Layer high level warmth body cover down proof, wind proof goose 850 fill down insulated Sleeping bag , Insulated SS double wall vacuumed keep, 12 Hours BPA Free Bottle , Packable three section compact trekking pole comfort in all conditions 8000M , Gloves outer Goretex 8000M , Gloves inner Goretex 8000M , Alpine Climbing down mitten 0.9 mm goat leather with DWR , Summit Bag Pack 360 degree reflectivity , Waterproof carbonated coating webbing strap durable duffle bag 135 ltr capacity , Socks heavy duty double layer insulated anti wick 8000M , Packable Waterproof Fabric Wind Cheater , Warm Face Mask UV protected full coverage breathable , Gloves Liners Goretex anti wick 8000M , UIAA adze geometry Axe Cum Hammer , UIAA adze geometry Axe Tehnical , UIAA adze geometry Trapeziodal cross section axe straight , 8000M Self positioning monitor device 338 , 360 degree camera 8000 M Anti magnetic insulated device , Camera high resolution 8000 M insulated extreme cold , Phinix 8 Solar 47 mm Dia navigation watch for summitter , HDPE High Density , High quality liquidium butane canister 8000M antifeez , Overall Complete Wind Proof Insulated for 8000M
Closing Date11 Mar 2025
Tender AmountRefer Documents 

Hindustan Aeronautics Limited - HAL Tender

Goods
Healthcare and Medicine
GEM
India
Description: CATEGORY: 3 BY 4 inches CPVC Collar , 1 inches CPVC Collar , CPVC Collar 1 inches X 1 BY 4 inches , 1 5 inches CPVC Collar , 2 5 inches CPVC Collar , 3 BY 4 inches CPVC Elbow Shoe , 1 inches CPVC Elbow , CPVC Elbow 1 inches X 1 BY 4 inches , 1 5 inches CPVC Elbow , 2 5 inches CPVC Elbow , 3 BY 4 inches CPVC Tee , 1 inches CPVC Tee , CPVC TEE 1 inches X 1 BY 4 inches , 1 1 BY 2 inches CPVC Tee , CPVC TEE 2 inches X1 BY 2 inches , CPVC Cap 3 BY 4 inches , CPVC Cap 1 inches , CPVC Cap 1 inches X 1 BY 4 inches , CPVC Cap 1 inches X 1 BY 2 inches , CPVC Cap 2 inches X 1 BY 2 inches , 1 inches CPVC Union , CPVC Union 1 inches X 1 BY 4 inches , 1 1 BY 2 inches CPVC Union , CPVC Union 2 inches X 1 BY 2 inches , 3 BY 4 inches CPVC MTA , 1 inches CPVC MTA , CPVC MTA 11 BY 4 inches , 3 BY 4 inches CPVC FTA , 1 X 1 BY 4 inches CPVC FTA , 3 BY 4 inches CPVC Gate Valve - Ashirwad , 1 inches CPVC Gate Valve -Ashirwad make , 1 X 1 BY 2 inches CPVC Gate Valve -Ashirwad , CPVC Gate Valve 2 inches X 1 BY 2 inches , CPVC PIPE 3 BY 4 INCH , CPVC PIPE 1 inches , CPVC PIPE 1 inches X 1 BY 4 inches , CPVC PIPE 1 inches X 1 BY 2 inches , CPVC PIPE 2 inches X 1 BY 2 inches , 4 inches PVC Pipe , PVC Elbow 45deg bend 8 inches , 100 ML CPVC Solvant , PVC Gum Solvent 100grm , TEFLON TAPE , 1 inches CPVC Tank Nipple
Closing Date12 Mar 2025
Tender AmountRefer Documents 
341-350 of 783 active Tenders