Tenders of Sbh Schulbau Hamburg
Tenders of Sbh Schulbau Hamburg
SBH Schulbau Hamburg Tender
Civil And Construction...+3Building Construction, Consultancy Services, Civil And Architectural Services
Germany
Closing Date11 Jun 2024
Tender AmountRefer Documents
Sbh | School Construction Hamburg, as a state-owned company of the Free and Hanseatic City of Hamburg (hereinafter referred to as Sbh), is responsible for planning, building, maintaining and managing school properties in accordance with economic principles, taking into account school interests, and renting out the more than 400 schools to the Authority for Schools and Vocational Training (bsb). The Bahrenfelder Strasse primary school is getting an extension and replacement building, located in the Hamburg district of Altona - Ottensen. For the new building, it is necessary to demolish a single-field hall, which will then be built over by the new building. The new building will house and rebuild classrooms, a cafeteria and two sports halls on the first floor. The construction site can be reached via Gaußstrasse. Here: ventilation
SBH Schulbau Hamburg Tender
Civil And Construction...+2Others, Civil Works Others
Germany
Closing Date6 Mar 2024
Tender AmountEUR 110 K (USD 115.8 K)
Germany – Architectural, Engineering And Planning Services – Erweiterung Zur 4-zügigkeit Sowie Neubau Gymnastikhalle Und Freilufthalle Am Grundschulstandort Franzosenkoppel 118 In Hamburg - Freianlagen Gem. § 38 Ff. Hoai
SBH Schulbau Hamburg Tender
Germany
Closing Date26 Jan 2024
Tender AmountRefer Documents
Sbh | School Construction Hamburg, as the state company of the Free and Hanseatic City of Hamburg (hereinafter referred to as Sbh), has the task of planning, building, maintaining and managing the school properties, taking school interests into account according to economic principles, and transferring the more than 400 schools to the School Authority And vocational training (bsb) for rent. At the Sts Rissen school site, a sports hall is to be renovated to improve energy efficiency. The hall is a three-field type sports hall from the 1970s. As part of the energy optimization of the building, the changing rooms and sanitary areas will also be redesigned and renovated in accordance with today's requirements. It is planned to repair the three-field sports hall as follows: Changing wings east and west - dismantling old roof covering, skylights, internal drainage. - Renewal of roof covering including insulation 24 cm, slope to the edge of the roof and changed drainage over the edge of the roof (gutter). - Production of facade insulation as a curtain wall (facade panels). - Creation of canopies in front of the entrance areas. - Dismantling and replacing all skylight windows as wood-aluminum windows. - Dismantling and replacing the entrance doors as steel elements as well as replacing the porch doors (steel). - Conversion of 2nd escape route in accordance with building permit type construction. - Installation of a wheelchair-accessible toilet with shower facilities. - Redesign/expansion of the changing areas for students and teachers. Renewal of floor coverings and ceilings. - Renovation and redesign of the sanitary areas. Renewal of plaster, screed and tiles. - Expansion of storage areas for sports equipment and media technology. Sports hall - expansion and renewal of all hall windows and glass block walls. Renewal as wood-aluminum window elements including motor control for ventilation and smoke extraction. - Creation of a smoke extraction and ventilation option for the middle hall segment. - Production of a roof sealing membrane on the hall roof as a renovation membrane including connection to the edge of the roof with liquid plastic (no renewal of the attic cover). - Renewal of the top covering of the baffle wall (felt). - Retrofitting acoustically effective wall absorbers on the hall walls (ball-proof). - Renewal of the lighting. The work will be carried out during school operations. In order to ensure partial use of the sports hall, the construction project will be carried out in three construction phases: 1.ba East Changing Wing February 2024 - July 2024 2.ba West Changing Wing June 2024 - November 2024 3.ba Hall July 2024 - September 2024 The construction site is away from the street Voßhagen Accessible via the school parking lot. Here: Ventilation The shower rooms and the interior toilet rooms are ventilated and ventilated. The specifications of DIN 18017 must be taken into account for the interior toilet rooms. A central exhaust air device is designed as a roof fan for each shower room. The ventilation units are located on the roof above the shower rooms. The afterflow comes from the sports hall. Decentralized individual fans are provided for the interior toilet systems. The moisture content of the air in the shower rooms is used as a reference variable for the regulation of the ventilation system, although the amount of exhaust air in the toilet rooms must not be undercut in accordance with the specifications of DIN 18017. The design of the exhaust fans is based on DIN 1946 for shower rooms and toilet systems as well as DIN 18017 for interior toilet rooms. When penetrating fire compartments, fire barriers are provided in accordance with the relevant requirements
751-760 of 758 archived Tenders