Tenders of Sbh Schulbau Hamburg

Tenders of Sbh Schulbau Hamburg

SBH Schulbau Hamburg Tender

Germany
Closing Date15 Oct 2024
Tender AmountNA 
Elevator, Döhrnstraße 42

SBH Schulbau Hamburg Tender

Germany
Closing Date7 Feb 2024
Tender AmountRefer Documents 
Painter, Paul-sorge-straße 133-135

SBH Schulbau Hamburg Tender

Works
Civil And Construction...+1Civil Works Others
Germany
Closing Date27 Feb 2024
Tender AmountEUR 9.9 Million (USD 10.4 Million)
Germany – Heating, Ventilation And Air-conditioning Installation Work – Heizung, Mendelstraße 6

SBH Schulbau Hamburg Tender

Civil And Construction...+1Building Construction
Germany
Closing Date22 Mar 2024
Tender AmountRefer Documents 
Sbh | School Construction Hamburg, as the state company of the Free and Hanseatic City of Hamburg (hereinafter referred to as Sbh), has the task of planning, building, maintaining and managing the school properties, taking school interests into account according to economic principles, and transferring the more than 400 schools to the School Authority And vocational training (bsb) for rent. The subject of this construction project is the renovation of the Strenge primary school. The school is located on Strenge 5, 22391 Hamburg (Wellingsbüttel). The building was built in 1936 and is a listed building. There are three floors with a total usable area of approximately 2,940 m². The construction site facility area is located in the school yard behind the building. Access is via Huswedelweg (alternatively via Strenge). The construction project will take place while the school is in operation, and mobile classrooms will be built on the site. The work is divided into 4 construction phases, which are carried out in direct sequence: 0.ba: 2 emergency stairs on the street side and auditorium 1.ba: renovation of the basement auditorium and the specialist rooms above it 2.ba: renovation of the south wing on the street side, ground floor, first floor 3.ba: Renovation East Wing Ug, Eg, Og The construction work is divided into this level according to the aforementioned construction phases and additionally divided into "renovation" and "conversion". The renovation measures include all services that are necessary for the proper renovation of the school. The renovation measures include all services that are necessary to turn the previous "corridor school" into a "compartment school". For this purpose, the fire sections are changed. Necessary hallways are largely eliminated, and the classrooms each form a fire zone with the hallways in front of them. The Roof Is Covered With Clay Pans On Cardboard Docks. An inspection run with a lifting platform is planned. A new small flat roof area is being built on the new external elevator shaft (street escape staircase). The facade on the east wing will be subsequently sealed. Some cracks are noticeable. Overall, the facade is in good condition. The windows were replaced less than 10 years ago and are in very good condition. Only the two windows necessary due to the new fire protection concept will be replaced. According to the assessment of structural engineers and fire protection experts, the ceilings meet the current regulations and therefore do not need to be upgraded. The school is divided into compartments. All subsequent changes are taken into account. The parquet floors in the classrooms are being refurbished and resealed. Solnhofen slabs are laid in the hallways and stairwells, which are cleaned and refurbished. In addition, some rooms are equipped with rubber flooring. The tiled floors and walls in the sanitary areas are retained as the sanitary areas were only renewed a few years ago. The walls remain largely intact. To create the compartments, some wall breakthroughs will be made, and some hallway walls will be demolished. The acoustic ceilings are all removed and will be replaced. Without exception, Hera design ceilings are used, in the stairwells in a non-flammable version. The lighting will be renewed and converted to LED. Two new external emergency stairs and an elevator will be built. The escape stairs consist of a steel structure, the elevator shaft is made of reinforced concrete. Here: painters and varnishers

SBH Schulbau Hamburg Tender

Civil And Construction...+1Building Construction
Germany
Closing Date4 Apr 2024
Tender AmountRefer Documents 
Metal construction doors, Lohkampstraße 145

SBH Schulbau Hamburg Tender

Works
Germany
Closing Date16 Jul 2024
Tender AmountEUR 14.8 Million (USD 15.5 Million)
Germany – Ventilation And Air-conditioning Installation Work – Lüftung, Lerchenfeld 10

SBH Schulbau Hamburg Tender

Germany
Closing Date13 Feb 2024
Tender AmountRefer Documents 
Construction Site Equipment, Grellkamp 38-40

SBH Schulbau Hamburg Tender

Civil And Construction...+1Building Construction
Germany
Closing Date3 Jul 2024
Tender AmountRefer Documents 
Sbh | School Construction Hamburg, as a state-owned company of the Free and Hanseatic City of Hamburg (hereinafter referred to as Sbh), is responsible for planning, building, maintaining and managing school properties, taking school interests into account, and other buildings with non-school use, in accordance with economic principles, and for renting out more than 400 schools and 17 other buildings to the Authority for Schools and Vocational Training (bsb). Gmh | Building Management Hamburg Gmbh (hereinafter referred to as Gmh) is a municipal company which, among other things, provides construction, operation and management services for over 50 general education school properties in the south of Hamburg (Wilhelmsburg and Harburg) as well as for sports and special buildings. The State Office for Education and Counseling (leb) is the state youth welfare provider in Hamburg and is responsible for providing properties for the accommodation of children and young people and managing them in accordance with economic principles. In this context, it is responsible for around 33 locations. The Free and Hanseatic City of Hamburg, the tax authority, Sbh and GmbH as well as the LEB as client (AG) award the execution of the hedge trimming at the locations (WE) in Hamburg for the contract period stated below as a framework agreement in 26 lots. Reference is made to the option right of extension (see Lb). Applications are possible for all lots, reference is made to the lot limitation (see Lb).

SBH Schulbau Hamburg Tender

Healthcare and Medicine
Germany
Closing Date27 May 2024
Tender AmountRefer Documents 
Ventilation, Kieler Straße 40

SBH Schulbau Hamburg Tender

Civil And Construction...+1Civil Works Others
Germany
Closing Date20 Feb 2024
Tender AmountRefer Documents 
Sbh | School Construction Hamburg, As The State Company Of The Free And Hanseatic City Of Hamburg (hereinafter Referred To As Sbh), Has The Task Of Planning, Building, Maintaining And Managing The School Properties, Taking School Interests Into Account According To Economic Principles, And Transferring The More Than 400 Schools To The School Authority And Vocational Training (bsb) For Rent. The Replacement On Grellkamp Will Result In A Major Restructuring Of The Location. Administrative Areas, A Vital Kitchen And Cafeteria Area, As Well As Classes And Specialist Rooms Find Their New Place In The Two-story Building. The Spacious Area Of The Cafeteria And Common Area With A Stage Is A Ground Floor Meeting Place. Four Large Compartments Will Be Built On The Upper Floor, Which Will Be Accessed With Staircases In Between With Necessary Corridors. Heat Is Generated Via District Heating, And Pv Panels Are Built On The Roof Surfaces. The New Building Will Receive Funding For Climate-friendly New Building (kfn) And Will Be Certified As Dgnb Gold. The Chosen Supporting Structure As A Mixture Between Reinforced Concrete Construction And Wooden Construction Favors The Construction Period And Allows For Later Conversions As Well As The Use Of Sustainable Building Materials. A Wooden Facade Is Planned For The Outer Shell. Here The Shell
731-740 of 758 archived Tenders