Tenders of Sbh Schulbau Hamburg
Tenders of Sbh Schulbau Hamburg
SBH Schulbau Hamburg Tender
Civil And Construction...+3Building Construction, Consultancy Services, Civil And Architectural Services
Germany
Closing Date8 Jul 2024
Tender AmountRefer Documents
Sbh | School Construction Hamburg, as a state-owned company of the Free and Hanseatic City of Hamburg (hereinafter referred to as Sbh), is responsible for planning, building, maintaining and managing school properties in accordance with economic principles, taking into account school interests, and renting out the more than 400 schools to the Authority for Schools and Vocational Training (bsb). The Bahrenfelder Strasse primary school is getting an extension and replacement building, and is located in the Hamburg district of Altona - Ottensen. Two sports halls are being built above a cafeteria and kitchen area as well as a classroom area. For the new building, it is necessary to demolish a single-field hall in order to create sufficient building space. The construction site can be reached via Gaußstrasse. Here: kitchen
SBH Schulbau Hamburg Tender
Civil And Construction...+1Building Construction
Germany
Closing Date19 Mar 2024
Tender AmountRefer Documents
Sbh | School Construction Hamburg, as the state company of the Free and Hanseatic City of Hamburg (hereinafter referred to as Sbh), has the task of planning, building, maintaining and managing the school properties, taking school interests into account according to economic principles, and transferring the more than 400 schools to the School Authority And vocational training (bsb) for rent. The subject of this construction project is the renovation of the Strenge primary school. The school is located on Strenge 5, 22391 Hamburg (Wellingsbüttel). The building was built in 1936 and is a listed building. There are three floors with a total usable area of approximately 2,940 m². The construction site facility area is located in the school yard behind the building. Access is via Huswedelweg (alternatively via Strenge). The construction project will take place while the school is in operation, and mobile classrooms will be built on the site. The work is divided into 4 construction phases, which are carried out in direct sequence: 0.ba: 2 emergency stairs on the street side and auditorium 1.ba: renovation of the basement auditorium and the specialist rooms above it 2.ba: renovation of the south wing on the street side, ground floor, first floor 3.ba: Renovation East Wing Ug, Eg, Og The construction work is divided into this level according to the aforementioned construction phases and additionally divided into "renovation" and "conversion". The renovation measures include all services that are necessary for the proper renovation of the school. The renovation measures include all services that are necessary to turn the previous "corridor school" into a "compartment school". For this purpose, the fire sections are changed. Necessary hallways are largely eliminated, and the classrooms each form a fire zone with the hallways in front of them. The Roof Is Covered With Clay Pans On Cardboard Docks. An inspection run with a lifting platform is planned. A new small flat roof area is being built on the new external elevator shaft (street escape staircase). The facade on the east wing will be subsequently sealed. Some cracks are noticeable. Overall, the facade is in good condition. The windows were replaced less than 10 years ago and are in very good condition. Only the two windows necessary due to the new fire protection concept will be replaced. According to the assessment of structural engineers and fire protection experts, the ceilings meet the current regulations and therefore do not need to be upgraded. The school is divided into compartments. All subsequent changes are taken into account. The parquet floors in the classrooms are being refurbished and resealed. Solnhofen slabs are laid in the hallways and stairwells, which are cleaned and refurbished. In addition, some rooms are equipped with rubber flooring. The tiled floors and walls in the sanitary areas are retained as the sanitary areas were only renewed a few years ago. The walls remain largely intact. To create the compartments, some wall breakthroughs will be made, and below some corridor walls will be demolished. The acoustic ceilings are all removed and will be replaced. Without exception, Hera design ceilings are used, in the stairwells in a non-flammable version. The lighting will be renewed and converted to LED. Two new external escape stairs and an elevator will be built. The escape stairs consist of a steel structure, the elevator shaft is made of reinforced concrete. Here: heating
SBH Schulbau Hamburg Tender
Civil And Construction...+1Building Construction
Germany
Closing Date2 Jul 2024
Tender AmountRefer Documents
Sbh | Schulbau Hamburg, as a state-owned company of the Free and Hanseatic City of Hamburg (hereinafter referred to as Sbh), is responsible for planning, building, maintaining and managing school properties in accordance with economic principles, taking school interests into account, and for renting out the more than 400 schools to the Authority for Schools and Vocational Training (bsb). The subject of this tender is the work for the conversion and extension of the existing cafeteria, building 9. The break hall, building 8, will be demolished in advance and as a separate project. Extension: Extension of the second dining room along the southern gable side. A breakthrough will be made in the existing dining room, connecting the existing area and the added area. The resulting area is approx. 125 sqm for 80 places. In addition, a cleaning supplies room will be built in the extension. Renovation: The area of the vital kitchen (already converted in 2021) and dining room 1 will remain untouched. In the warehouse, the staff toilet will be relocated and the storage area enlarged. The current dry storage area will be converted into a staff room with an adjacent toilet. The toilet facilities will remain in the existing building. Here: drywall
21-30 of 758 archived Tenders