Tenders of Sbh Schulbau Hamburg
Tenders of Sbh Schulbau Hamburg
Sorry!
No Active
Tenders of Sbh Schulbau Hamburg
foundCheck archived
Tenders of Sbh Schulbau Hamburg
SBH Schulbau Hamburg Tender
Germany
Closing Date18 Oct 2023
Tender AmountRefer Documents
Sbh | School Construction Hamburg, as the state company of the Free and Hanseatic City of Hamburg (hereinafter referred to as Sbh), has the task of planning, building, maintaining and managing the school properties, taking school interests into account according to economic principles, and transferring the more than 400 schools to the School Authority And vocational training (bsb) for rent. The Archenholzstraße primary school is being expanded to 4.5 trains. For this purpose, a Hamburg classroom is currently under construction, which will also contain the future administration. The previous administration with partial basements as well as three single-story honeycomb buildings with crawl spaces are to be demolished after the classroom building is completed. Here: Demolition The services include the complete dismantling of the two-story administration building (born 01) with partial basement as well as the three single-story honeycomb buildings 10,11,12. With crawl spaces at the Archenholzstraße primary school location. There are components containing asbestos as well as insulation and suspended ceilings, floors and walls made of artificial mineral fibers. Before the mechanical demolition work begins, these components must be completely removed and disposed of professionally as part of pollutant remediation measures. - Construction site equipment - Gutting and pollutant remediation of the existing buildings, in particular work with asbestos-containing products and KMF insulation materials - Mechanical dismantling of the following buildings: - Building 01 (administrative building): Approximate dimensions of the building to be dismantled: length and width: approx. 31.5 m 11 M² Bgf: Approx. 350 M², Basement area: Approx. 150 M² Ridge height: Approx. 7.6 M Converted space: Approx. 3,200 M³ - Building 10 (class building): Approximate dimensions of the building to be dismantled: Length: Approx. 27 M Width: Approx. 15 M Ridge height: Approx. 3.8 M Built-up area: Approx. 250 M² Constructed space: Approx. 1,100 M³ - Building 11 (class building): Approximate dimensions of the building to be dismantled: Length: Approx. 27 M wide : Approx. 15 M Ridge height: Approx. 3.8 M Built-up area: Approx. 250 M² Constructed space: Approx. 1,100 M³ - Building 12 (class building): Approximate dimensions of the building to be dismantled: Length: Approx. 54 M Width: Approx. 15 M Ridge height: C. 3.8 M Built-up area: Approx. 500 M² Constructed space: Approx. 2,200 M³ - Dismantling arcades: Approx. 200 M² - Dismantling the floor slab of a break hall, approx. 340 M² with a component height of approx. 25 cm - 6 tree fellings - Green cuttings approx. 150 m² - Waste declaration approx. 7 analyzes - Transport and disposal of demolition waste including the following quantities: approx. 3,300 t concrete (rc-1 to rc-3), approx. 1,000 t building rubble (rc-1 to Rc-3), approx. 15 T waste containing asbestos, approx. 12 T insulation material from Kmf, approx. 24 T waste wood (ii), approx. 11 T waste wood (iv), approx. 41 T bitumen mixtures (asbestos and tar free), Approx. 105 T bitumen mixture (containing tar), approx. 80 T mixed demolition waste, approx. 300 pieces fluorescent tubes, approx. 14 T building materials containing gypsum, small capacitors 300 pieces