Pumps Tenders
Pumps Tenders
Municipality Of Mapanas, Northern Samar Tender
Philippines
Details: Description Bidding Documents Procurement Of Infrastructure Projects Name Of Project: Improvement Of Jubasan Barangay Road Barangay Jubasan, Mapanas Northern Samar Contract Reference No. 2024-11-108 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 7 Section Iii. Bid Data Sheet 35 Section Iv. General Conditions Of Contract 38 Section V. Special Conditions Of Contract 70 Section Vi. Specifications 72 Section Vii. Drawings 75 Section Viii. Bill Of Quantities Error! Bookmark Not Defined. Section Ix. Bidding Forms 77 Section X. Foreign-assisted Projects Error! Bookmark Not Defined. Section I. Invitation To Bid Bid Notice Abstract Invitation To Bid (itb) Republic Of The Philippines Province Of Northern Samar Municipality Of Mapanas Invitation To Bid For Project: Improvement Of Jubasan Barangay Road, Brgy. Jubasan, Mapanas, Northern Samar The Lgu- Mapanas, Northern Samar, Through The 20% Economic Development Fund (edf) Of Fy 2025 Intends To Apply The Sum Of One Million Nine Hundred Eighty One Thousand Three Hundred Thirty Two Pesos 95/100 Only (p1,980,781.48) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For : Improvement Of Jubasan Barangay Road, Brgy. Jubasan, Mapanas, Northern Samar Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Lgu- Mapanas, Northern Samar Now Invites Bids For The Following Description Of Works To Be Procured: Item No. Scope Of Work Quantity Unit Improvement Of Jubadan Barangay Road, Brgy. Jubasan, Mapanas, Northern Samar B.5 Project Billboard/sign Board 1.00 Each B.7(2) Occupational Safety And Health Program 1.00 Is B.9 Mobilization/demobilization 1.00 Is Part C Earthworks 102(2)b Surplus Common Excavation 261.00 Cu.m. 104(1)a Embankment From Roadway Excavation (common Soil) 248.00 Cu.m. 104(2)a Embankment From Borrow (common Soil) 0.00 Cu.m. 105(1) Subgrade Preparation (common Material) 1131.00 Sq.m. Part D Subbase And Base Course 200(1) Aggregate Subbase Course 117.45 Cu.m. 201(1) Aggregate Base Course 226.20 Cu.m. Part E Surface Courses 311(1)a2 Pcc Pavement (plain) Conventional Method, 200mm Thk. 435.00 Sq.m. Completion Of The Works Is Required 90 Calendar Days. Bidders Should Have Completed, Within Ten (10) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. Section Ii. Instructions To Bidders. 2. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From Lgu- Bac Mapanas, Northern Samar And Inspect The Bidding Documents At The Address Given Below From November 26, 2024-december 13, 2024, 8:00 A.m. To 5:00 Pm. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of P5,000.00. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later That The Submission Of Their Bids. 5. The Lgu- Mapana, Northern Samar Will Hold A Pre-bid Conference On December 5, 2024 At 10:00 A.m. At Executive Conference, 2nd Floor Of New Municipal Bldg. Mapanas, Northern Samar, Which Shall Be Open Only To All Interested Parties Who Have Purchased The Bidding Documents. 6. Bids Must Be Delivered To The Address Below On Or Before 9:00 A.m. Of December 16, 2024 At Bac Office, @ Municipal Planning & Development Office (mpdo), Mapanas, Northern Samar. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bids Will Be Opened In The Presence Of The Bidders’ Authorized Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. The Bidder May Request That The Bid Documents Be Sent To Them By Mail Or Courier, And For This, The Bidder Shall Pay The Amount In Philippine Peso To Cover The Cost Of Mail Or Courier Delivery. The Fee For Obtaining A Copy Of The Bid Documents And The Cost Of Mail Or Courier Shall Be Paid By The Bidder Thru S Cashier’s Check Or Manager’s Check Issued In Favor Of The Municipality Of Mapanas. 7. The Lgu- Mapanas, Northern Samar Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 8. For Further Information, Please Refer To: Reno C. Salazar Bac Secretary Mapanas, Northern Samar Mobile # 09459852914 Ma. Teresa L. Minguez Bac Chairperson Mapanas, Northern Samar Mobile # 09778033758 Section Ii. Instructions To Bidders 1. The Bids Must Be Delivered On Or Before December 16, 2024 At 9:00 A.m And Failure To Submit The Bid Proposal May Ground For Disqualification Of The Bid. 2. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Lgu- Mapanas, Northern Samar Now Invites Bids For The Following Description Of Works To Be Procured: Item No. Scope Of Work Quantity Unit Improvement Of Jubasan Barangay Road , Brgy. Jubasan, Mapanas, N. Samar B.5 Projects Billboard/sign Board 1.00 Each B.7(2) Occupational Safety And Health Program 1.00 I.s B.9 Mobilization And Demobilization 1.00 I.s. Part C Earthworks 102(2)b Surplus Common Excavation 261.00 Cu.m. 104(1)a Embankment From Roadway Excavation (common Soil) 248.00 Cu.m. 104(2)a Embankment From Borrow (common Soil) 0.00 Cu.m. 105(1) Subgrade Preparation (common Material) 1131.00 Sq.m. Part D 200(1) Aggregate Subbase Course 117.45 Cu.m. 201(1) Aggregate Base Course 226.20 Cu.m. Part E 311(1)a2 Pcc Pavement (plain)-conventional Method 200mm Thk. 435.00 Sq.m. Completion Of The Works Is Required 90 Calendar Days. Bidders Should Have Completed, Within Ten (10) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 2. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 3. Interested Bidders May Obtain Further Information From Lgu- Bac Mapanas, Northern Samar And Inspect The Bidding Documents At The Address Given Below From November 26, 2024-december 13, 2024, 8:00 A.m. To 5:00 Pm. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of P5,000.00. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later That The Submission Of Their Bids. 4. The Lgu- Mapanas, Northern Samar Will Hold A Pre-bid Conference On December 5, 2024 At 10:00 A.m. At Executive Conference, 2nd Floor Of New Municipal Bldg. Mapanas, Northern Samar, Which Shall Be Open Only To All Interested Parties Who Have Purchased The Bidding Documents. 5. Bids Must Be Delivered To The Address Below On Or Before 9:00 A.m. Of December 16, 2024 At Bac Office, @ Municipal Planning & Development Office (mpdo), Mapanas, Northern Samar. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bids Will Be Opened In The Presence Of The Bidders’ Authorized Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. The Bidder May Request That The Bid Documents Be Sent To Them By Mail Or Courier, And For This, The Bidder Shall Pay The Amount In Philippine Peso To Cover The Cost Of Mail Or Courier Delivery. The Fee For Obtaining A Copy Of The Bid Documents And The Cost Of Mail Or Courier Shall Be Paid By The Bidder Thru S Cashier’s Check Or Manager’s Check Issued In Favor Of The Municipality Of Mapanas. 6. The Lgu- Mapanas, Northern Samar Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 7. For Further Information, Please Refer To: Reno C. Salazar Bac Secretary Mapanas, Northern Samar Mobile # 09459852914 Ma. Teresa L. Minguez Bac Chairperson Mapanas N. Samar Mobile # 09778033758 Table Of Contents A. General 11 1. Scope Of Bid 11 2. Source Of Funds 11 3. Corrupt, Fraudulent, Collusive, And Coercive Practices 11 4. Conflict Of Interest 12 5. Eligible Bidders 14 6. Bidder’s Responsibilities 15 7. Origin Of Goods And Services 17 8. Subcontracts 17 B. Contents Of Bidding Documents 17 9. Pre-bid Conference 17 10. Clarification And Amendment Of Bidding Documents 18 C. Preparation Of Bids 18 11. Language Of Bids 18 12. Documents Comprising The Bid: Eligibility And Technical Components 18 13. Documents Comprising The Bid: Financial Component 21 14. Alternative Bids 21 15. Bid Prices 22 16. Bid Currencies 22 17. Bid Validity 23 18. Bid Security 23 19. Format And Signing Of Bids 25 20. Sealing And Marking Of Bids 26 D. Submission And Opening Of Bids 26 21. Deadline For Submission Of Bids 26 22. Late Bids 26 23. Modification And Withdrawal Of Bids 27 24. Opening And Preliminary Examination Of Bids 27 E. Evaluation And Comparison Of Bids 28 25. Process To Be Confidential 28 26. Clarification Of Bids 29 27. Detailed Evaluation And Comparison Of Bids 29 28. Post Qualification 30 29. Reservation Clause 31 F. Award Of Contract 32 30. Contract Award 32 31. Signing Of The Contract 33 32. Performance Security 33 33. Notice To Proceed 34 A. General 1. Scope Of Bid 1.1. The Procuring Entity As Defined In The Bds, Invites Bids For The Construction Of Works, As Described In Section Vi. Specifications. The Name And Identification Number Of The Contract Is Provided In The Bds. 1.2. The Successful Bidder Will Be Expected To Complete The Works By The Intended Completion Date Specified In Scc Clause 1.16. 2. Source Of Funds The Procuring Entity Has A Budget Or Has Applied For Or Received Funds From The Funding Source Named In The Bds, And In The Amount Indicated In The Bds. It Intends To Apply Part Of The Funds Received For The Project, As Defined In The Bds, To Cover Eligible Payments Under The Contract For The Works. 3. Corrupt, Fraudulent, Collusive, And Coercive Practices 3.1. Unless Otherwise Specified In The Bds, The Procuring Entity, As Well As Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. In Pursuance Of This Policy, The Funding Source: (a) Defines, For Purposes Of This Provision, The Terms Set Forth Below As Follows: (i) "corrupt Practice" Means Behavior On The Part Of Officials In The Public Or Private Sectors By Which They Improperly And Unlawfully Enrich Themselves, Others, Or Induce Others To Do So, By Misusing The Position In Which They Are Placed, And Includes The Offering, Giving, Receiving, Or Soliciting Of Anything Of Value To Influence The Action Of Any Such Official In The Procurement Process Or In Contract Execution; Entering, On Behalf Of The Procuring Entity, Into Any Contract Or Transaction Manifestly And Grossly Disadvantageous To The Same, Whether Or Not The Public Officer Profited Or Will Profit Thereby, And Similar Acts As Provided In Republic Act 3019; (ii) "fraudulent Practice" Means A Misrepresentation Of Facts In Order To Influence A Procurement Process Or The Execution Of A Contract To The Detriment Of The Procuring Entity, And Includes Collusive Practices Among Bidders (prior To Or After Bid Submission) Designed To Establish Bid Prices At Artificial, Non-competitive Levels And To Deprive The Procuring Entity Of The Benefits Of Free And Open Competition; (iii) “collusive Practices” Means A Scheme Or Arrangement Between Two Or More Bidders, With Or Without The Knowledge Of The Procuring Entity, Designed To Establish Bid Prices At Artificial, Non-competitive Levels; And (iv) “coercive Practices” Means Harming Or Threatening To Harm, Directly Or Indirectly, Persons, Or Their Property To Influence Their Participation In A Procurement Process, Or Affect The Execution Of A Contract; (v) “obstructive Practice” Is (aa) Deliberately Destroying, Falsifying, Altering Or Concealing Of Evidence Material To An Administrative Proceedings Or Investigation Or Making False Statements To Investigators In Order To Materially Impede An Administrative Proceedings Or Investigation Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Into Allegations Of A Corrupt, Fraudulent, Coercive Or Collusive Practice; And/or Threatening, Harassing Or Intimidating Any Party To Prevent It From Disclosing Its Knowledge Of Matters Relevant To The Administrative Proceedings Or Investigation Or From Pursuing Such Proceedings Or Investigation; Or (bb) Acts Intended To Materially Impede The Exercise Of The Inspection And Audit Rights Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Herein. (b) Will Reject A Proposal For Award If It Determines That The Bidder Recommended For Award Has Engaged In Corrupt Or Fraudulent Practices In Competing For The Contract; And (c) Will Declare A Firm Ineligible, Either Indefinitely Or For A Stated Period Of Time, To Be Awarded Contract Funded By The Funding Source If It At Any Time Determines That The Firm Has Engaged In Corrupt Or Fraudulent Practices In Competing Or, Or In Executing, A Contract Funded By The Funding Source. 3.2. Further, The Procuring Entity Will Seek To Impose The Maximum Civil, Administrative, And/or Criminal Penalties Available Under The Applicable Laws On Individuals And Organizations Deemed To Be Involved In Any Of The Practices Mentioned In Itb Clause 3.1(a). 3.3. Furthermore, The Funding Source And The Procuring Entity Reserve The Right To Inspect And Audit Records And Accounts Of A Contractor In The Bidding For And Performance Of A Contract Themselves Or Through Independent Auditors As Reflected In The Gcc Clause 34. 4. Conflict Of Interest 4.1. All Bidders Found To Have Conflicting Interests Shall Be Disqualified To Participate In The Procurement At Hand, Without Prejudice To The Imposition Of Appropriate Administrative, Civil, And Criminal Sanctions. A Bidder May Be Considered To Have Conflicting Interests With Another Bidder In Any Of The Events Described In Paragraphs (a) Through (c) And A General Conflict Of Interest In Any Of The Circumstances Set Out In Paragraphs (d) Through (g) Below: (a) A Bidder Has Controlling Shareholders In Common With Another Bidder; (b) A Bidder Receives Or Has Received Any Direct Or Indirect Subsidy From Any Other Bidder; (c) A Bidder Has The Same Legal Representative As That Of Another Bidder For Purposes Of This Bid; (d) A Bidder Has A Relationship, Directly Or Through Third Parties, That Puts Them In A Position To Have Access To Information About Or Influence On The Bid Of Another Bidder Or Influence The Decisions Of The Procuring Entity Regarding This Bidding Process. This Will Include A Firm Or An Organization Who Lends, Or Temporarily Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement For Or Implementation Of The Project If The Personnel Would Be Involved In Any Capacity On The Same Project; (e) A Bidder Submits More Than One Bid In This Bidding Process. However, This Does Not Limit The Participation Of Subcontractors In More Than One Bid; (f) A Bidder Who Participated As A Consultant In The Preparation Of The Design Or Technical Specifications Of The Goods And Related Services That Are The Subject Of The Bid; Or (g) A Bidder Who Lends, Or Temporary Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement For Or Implementation Of The Project, If The Personnel Would Be Involved In Any Capacity On The Same Project. 4.2. In Accordance With Section 47 Of The Irr Of Ra 9184, All Bidding Documents Shall Be Accompanied By A Sworn Affidavit Of The Bidder That It Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), Members Of The Technical Working Group (twg), Members Of The Bac Secretariat, The Head Of The Project Management Office (pmo) Or The End-user Unit, And The Project Consultants, By Consanguinity Or Affinity Up To The Third Civil Degree. On The Part Of The Bidder, This Clause Shall Apply To The Following Persons: (a) If The Bidder Is An Individual Or A Sole Proprietorship, To The Bidder Himself; (b) If The Bidder Is A Partnership, To All Its Officers And Members; (c) If The Bidder Is A Corporation, To All Its Officers, Directors, And Controlling Stockholders; And (d) If The Bidder Is A Joint Venture (jv), The Provisions Of Items (a), (b), Or (c) Of This Clause Shall Correspondingly Apply To Each Of The Members Of The Said Jv, As May Be Appropriate. Relationship Of The Nature Described Above Or Failure To Comply With This Clause Will Result In The Automatic Disqualification Of A Bidder. 5. Eligible Bidders 5.1. Unless Otherwise Indicated In The Bds, The Following Persons Shall Be Eligible To Participate In This Bidding: (a) Duly Licensed Filipino Citizens/sole Proprietorships; (b) Partnerships Duly Organized Under The Laws Of The Philippines And Of Which At Least Seventy Five Percent (75%) Of The Interest Belongs To Citizens Of The Philippines; (c) Corporations Duly Organized Under The Laws Of The Philippines, And Of Which At Least Seventy Five Percent (75%) Of The Outstanding Capital Stock Belongs To Citizens Of The Philippines; (d) Cooperatives Duly Organized Under The Laws Of The Philippines, And Of Which At Least Seventy Five Percent (75%) Of The Interest Belongs To Citizens Of The Philippines; And (e) Persons/entities Forming Themselves Into A Jv, I.e., A Group Of Two (2) Or More Persons/entities That Intend To Be Jointly And Severally Responsible Or Liable For A Particular Contract: Provided, However, That, In Accordance With Letter Of Instructions No. 630, Filipino Ownership Or Interest Of The Joint Venture Concerned Shall Be At Least Seventy Five Percent (75%): Provided, Further, That Joint Ventures In Which Filipino Ownership Or Interest Is Less Than Seventy Five Percent (75%) May Be Eligible Where The Structures To Be Built Require The Application Of Techniques And/or Technologies Which Are Not Adequately Possessed By A Person/entity Meeting The Seventy Five Percent (75%) Filipino Ownership Requirement: Provided, Finally, That In The Latter Case, Filipino Ownership Or Interest Shall Not Be Less Than Twenty Five Percent (25%). For This Purpose Filipino Ownership Or Interest Shall Be Based On The Contributions Of Each Of The Members Of The Joint Venture As Specified In Their Jva. 5.2. The Procuring Entity May Also Invite Foreign Bidders When Provided For Under Any Treaty Or International Or Executive Agreement As Specified In The Bds. 5.3. Government Corporate Entities May Be Eligible To Participate Only If They Can Establish That They (a) Are Legally And Financially Autonomous, (b) Operate Under Commercial Law, And (c) Are Not Dependent Agencies Of The Gop Or The Procuring Entity. 5.4. (a) Unless Otherwise Provided In The Bds, The Bidder Must Have Completed, Within Ten (10) Years From The Submission Of Bids, A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted To Current Prices Using The National Statistics Office Consumer Price Index. (b) For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bds. For This Purpose, Contracts Similar To The Project Shall Be Those Described In Thebds, And Completed Within The Period Stated In The Invitation To Bid And Itb Clause 12.1(a)(iii). 5.5. The Bidder Must Submit A Computation Of Its Net Financial Contracting Capacity (nfcc) Or A Commitment From A Universal Or Commercial Bank To Extend A Credit Line In Its Favor If Awarded The Contract For This Project (clc). The Nfcc, Computed Using The Following Formula, Must Be At Least Equal To The Abc To Be Bid: Nfcc = [(current Assets Minus Current Liabilities) (k)] Minus The Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Ongoing Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project. Where: K = 10 For A Contract Duration Of One Year Or Less, 15 For A Contract Duration Of More Than One Year Up To Two Years, And 20 For A Contract Duration Of More Than Two Years. The Clc Must Be At Least Equal To Ten Percent (10%) Of The Abc For This Project. If Issued By A Foreign Bank, It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank. In The Case Of Local Government Units (lgus), The Bidder May Also Submit Clc From Other Banks Certified By The Bangko Sentral Ng Pilipinas (bsp) As Authorized To Issue Such Financial Instrument. 6. Bidder’s Responsibilities 6.1. The Bidder Or Its Duly Authorized Representative Shall Submit A Sworn Statement In The Form Prescribed In Section Ix. Bidding Forms As Required In Itb Clause 12.1(b)(iii). 6.2. The Bidder Is Responsible For The Following: (a) Having Taken Steps To Carefully Examine All Of The Bidding Documents; (b) Having Acknowledged All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; (c) Having Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; (d) Having Complied With Its Responsibility To Inquire Or Secure Supplemental/bid Bulletin/s As Provided Under Itb Clause 10.3. (e) Ensuring That It Is Not “blacklisted” Or Barred From Bidding By The Gop Or Any Of Its Agencies, Offices, Corporations, Or Lgus, Including Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Gppb; (f) Ensuring That Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; (g) Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative/s To Verify All The Documents Submitted; (h) Ensuring That The Signatory Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary And/or To Represent The Bidder In The Bidding, With The Duly Notarized Secretary’s Certificate Attesting To Such Fact, If The Bidder Is A Corporation, Partnership, Cooperative, Or Joint Venture; (i) Complying With The Disclosure Provision Under Section 47 Of The Act In Relation To Other Provisions Of Republic Act 3019; And (j) Complying With Existing Labor Laws And Standards, If Applicable. Failure To Observe Any Of The Above Responsibilities Shall Be At The Risk Of The Bidder Concerned. 6.3. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contract Works And The Conditions For This Project And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 6.4. It Shall Be The Sole Responsibility Of The Prospective Bidder To Determine And To Satisfy Itself By Such Means As It Considers Necessary Or Desirable As To All Matters Pertaining To This Project, Including: (a) The Location And The Nature Of The Contract, Project, Or Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work. 6.5. The Procuring Entity Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Or Conclusions By The Prospective Or Eligible Bidder Out Of The Data Furnished By The Procuring Entity. 6.6. Before Submitting Their Bids, The Bidders Are Deemed To Have Become Familiar With All Existing Laws, Decrees, Ordinances, Acts And Regulations Of The Philippines Which May Affect The Contract In Any Way. 6.7. The Bidder Shall Bear All Costs Associated With The Preparation And Submission Of His Bid, And The Procuring Entity Will In No Case Be Responsible Or Liable For Those Costs, Regardless Of The Conduct Or Outcome Of The Bidding Process. 6.8. Bidders Should Note That The Procuring Entity Will Only Accept Bids Only From Those That Have Paid The Nonrefundable Fee For The Bidding Documents At The Office Indicated In The Invitation To Bid. 7. Origin Of Goods And Services There Is No Restriction On The Origin Of Goods, Or Contracting Of Works Or Services Other Than Those Prohibited By A Decision Of The United Nations Security Council Taken Under Chapter Vii Of The Charter Of The United Nations. 8. Subcontracts 8.1. Unless Otherwise Specified In The Bds, The Bidder May Subcontract Portions Of The Works To An Extent As May Be Approved By The Procuring Entity And Stated In The Bds. However, Subcontracting Of Any Portion Shall Not Relieve The Bidder From Any Liability Or Obligation That May Arise From The Contract For This Project. 8.2. Subcontractors Must Submit The Documentary Requirements Under Itb Clause 12 And Comply With The Eligibility Criteria Specified In The Bds. In The Event That Any Subcontractor Is Found By The Procuring Entity To Be Ineligible, The Subcontracting Of Such Portion Of The Works Shall Be Disallowed. 8.3. The Bidder May Identify The Subcontractor To Whom A Portion Of The Works Will Be Subcontracted At Any Stage Of The Bidding Process Or During Contract Implementation. If The Bidder Opts To Disclose The Name Of The Subcontractor During Bid Submission, The Bidder Shall Include The Required Documents As Part Of The Technical Component Of Its Bid. B. Contents Of Bidding Documents 9. Pre-bid Conference 9.1. (a) If So Specified In The Bds, A Pre-bid Conference Shall Be Held At The Venue And On The Date Indicated Therein, To Clarify And Address The Bidders’ Questions On The Technical And Financial Components Of This Project. (b) The Pre-bid Conference Shall Be Held At Least Twelve (12) Calendar Days Before The Deadline For The Submission Of And Receipt Of Bids. If The Procuring Entity Determines That, By Reason Of The Method, Nature, Or Complexity Of The Contract To Be Bid, Or When International Participation Will Be More Advantageous To The Gop, A Longer Period For The Preparation Of Bids Is Necessary, The Pre-bid Conference Shall Be Held At Least Thirty (30) Calendar Days Before The Deadline For The Submission And Receipt Of Bids, As Specified In The Bds. 9.2. Bidders Are Encouraged To Attend The Pre-bid Conference To Ensure That They Fully Understand The Procuring Entity’s Requirements. Non-attendance Of The Bidder Will In No Way Prejudice Its Bid; However, The Bidder Is Expected To Know The Changes And/or Amendments To The Bidding Documents As Recorded In The Minutes Of The Pre-bid Conference And The Supplemental/bid Bulletin. 9.3. Any Statement Made At The Pre-bid Conference Shall Not Modify The Terms Of The Bidding Documents Unless Such Statement Is Specifically Identified In Writing As An Amendment Thereto And Issued As A Supplemental/bid Bulletin. 10. Clarification And Amendment Of Bidding Documents 10.1. Bidders Who Have Purchased The Bidding Documents May Request For Clarification(s) On Any Part Of The Bidding Documents Or For An Interpretation. Such A Request Must Be In Writing And Submitted To The Procuring Entity At The Address Indicated In The Bds At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10.2. Supplemental/bid Bulletins May Be Issued Upon The Procuring Entity’s Initiative For Purposes Of Clarifying Or Modifying Any Provision Of The Bidding Documents Not Later Than Seven (7) Calendar Days Before The Deadline For The Submission And Receipt Of Bids. Any Modification To The Bidding Documents Shall Be Identified As An Amendment. 10.3. Any Supplemental/bid Bulletin Issued By The Bac Shall Also Be Posted On The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity Concerned, If Available. Unless, Otherwise Provided In The Bds, It Shall Be The Responsibility Of All Bidders Who Secure The Bidding Documents To Inquire And Secure Supplemental/bid Bulletins That May Be Issued By The Bac. However, Bidders Who Have Submitted Bids Before The Issuance Of The Supplemental/bid Bulletin Must Be Informed And Allowed To Modify Or Withdraw Their Bids In Accordance With Itb Clause 23. C. Preparation Of Bids 11. Language Of Bids The Bid, As Well As All Correspondence And Documents Relating To The Bid Exchanged By The Bidder And The Procuring Entity, Shall Be Written In English. Supporting Documents And Printed Literature Furnished By The Bidder May Be In Another Language Provided They Are Accompanied By An Accurate Translation In English Certified By The Appropriate Embassy Or Consulate In The Philippines, In Which Case The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 12. Documents Comprising The Bid: Eligibility And Technical Components 12.1. Unless Otherwise Indicated In The Bds, The First Envelope Shall Contain The Following Eligibility And Technical Documents: (a) Eligibility Documents – Class "a" Documents: (i) Registration Certificate From The Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives, Or Any Proof Of Such Registration As Stated In The Bds; (ii) Mayor’s Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located; (iii) Statement Of All Its Ongoing And Completed Government And Private Contracts Within Ten (10) Years From The Submission Of Bids, Including Contracts Awarded But Not Yet Started, If Any. The Statement Shall Include, For Each Contract, The Following: (iii.1) Name Of The Contract; (iii.2) Date Of The Contract; (iii.3) Contract Duration; (iii.4) Owner’s Name And Address; (iii.5) Nature Of Work; (iii.6) Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation; (iii.7) Total Contract Value At Award; (iii.8) Date Of Completion Or Estimated Completion Time; (iii.9) Total Contract Value At Completion, If Applicable; (iii.10) Percentages Of Planned And Actual Accomplishments, If Applicable; (iii.11) Value Of Outstanding Works, If Applicable; (iii.12) The Statement Shall Be Supported By The Notices Of Award And/or Notices To Proceed Issued By The Owners; And (iii.13) The Statement Shall Be Supported By The Constructors Performance Evaluation System (cpes) Rating Sheets, And/or Certificates Of Completion And Owner’s Acceptance, If Applicable; (iv) Unless Otherwise Provided In The Bds, Valid Philippine Contractors Accreditation Board (pcab) License And Registration For The Type And Cost Of The Contract For This Project; (v) Audited Financial Statements, Showing, Among Others, The Prospective Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; (vi) Nfcc Computation Or Clc In Accordance With Itb Clause 5.5; And Class "b" Document: (vii) If Applicable, Valid Joint Venture Agreement (jva) Or, In Lieu Thereof, Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful Shall Be Included In The Bid. (b) Technical Documents – (i) Bid Security As Prescribed In Itb Clause 18. If The Bidder Opts To Submit The Bid Security In The Form Of: (i.1) A Bank Draft/guarantee Or An Irrevocable Letter Of Credit Issued By A Foreign Bank, It Shall Be Accompanied By A Confirmation From A Universal Or Commercial Bank; Or (i.2) A Surety Bond Accompanied By A Certification Coming From An Authorized Insurance Commission That A Surety Or Insurance Company Is Authorized To Issue Such Instrument; (ii) Project Requirements, Which Shall Include The Following: (ii.1) Organizational Chart For The Contract To Be Bid; (ii.2) List Of Contractor’s Personnel (viz, Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; And (ii.3) List Of Contractor’s Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project; And (iii) Sworn Statement In Accordance With Section 25.2(b)(iv) Of The Irr Of Ra 9184 And Using The Form Prescribed In Section Ix. Bidding Forms. 13. Documents Comprising The Bid: Financial Component 13.1. Unless Otherwise Stated In The Bds, The Financial Component Of The Bid Shall Contain The Following: (a) Financial Bid Form In Accordance With The Form Prescribed In Section Ix. Bidding Forms; And (b) Any Other Document Related To The Financial Component Of The Bid As Stated In The Bds. 13.2. (a) Unless Indicated In The Bds, All Bids That Exceed The Abc Shall Not Be Accepted. (b) Unless Otherwise Indicated In The Bds, For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Following Conditions Are Met: (i) Bidding Documents Are Obtainable Free Of Charge On A Freely Accessible Website. If Payment Of Bidding Documents Is Required By The Procuring Entity, Payment Could Be Made Upon The Submission Of Bids. (ii) The Procuring Entity Has Procedures In Place To Ensure That The Abc Is Based On Recent Estimates Made By The Engineer Or The Responsible Unit Of The Procuring Entity And That The Estimates Are Based On Adequate Detailed Engineering (in The Case Of Works) And Reflect The Quality, Supervision And Risk And Inflationary Factors, As Well As Prevailing Market Prices, Associated With The Types Of Works Or Goods To Be Procured. (iii) The Procuring Entity Has Trained Cost Estimators On Estimating Prices And Analyzing Bid Variances. In The Case Of Infrastructure Projects, The Procuring Entity Must Also Have Trained Quantity Surveyors. (iv) The Procuring Entity Has Established A System To Monitor And Report Bid Prices Relative To Abc And Engineer’s/procuring Entity’s Estimate. (v) The Procuring Entity Has Established A Monitoring And Evaluation System For Contract Implementation To Provide A Feedback On Actual Total Costs Of Goods And Works. 14. Alternative Bids 14.1. Alternative Bids Shall Be Rejected. For This Purpose, Alternative Bid Is An Offer Made By A Bidder In Addition Or As A Substitute To Its Original Bid Which May Be Included As Part Of Its Original Bid Or Submitted Separately Therewith For Purposes Of Bidding. A Bid With Options Is Considered An Alternative Bid Regardless Of Whether Said Bid Proposal Is Contained In A Single Envelope Or Submitted In Two (2) Or More Separate Bid Envelopes. 14.2. Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 14.3. Each Bidder Shall Submit Only One Bid, Either Individually Or As A Partner In A Jv. A Bidder Who Submits Or Participates In More Than One Bid (other Than As A Subcontractor If A Subcontractor Is Permitted To Participate In More Than One Bid) Will Cause All The Proposals With The Bidder’s Participation To Be Disqualified. This Shall Be Without Prejudice To Any Applicable Criminal, Civil And Administrative Penalties That May Be Imposed Upon The Persons And Entities Concerned. 15. Bid Prices 15.1. The Contract Shall Be For The Whole Works, As Described In Itb Clause 1.1, Based On The Priced Bill Of Quantities Submitted By The Bidder. 15.2. The Bidder Shall Fill In Rates And Prices For All Items Of The Works Described In The Bill Of Quantities. Bids Not Addressing Or Providing All Of The Required Items In The Bidding Documents Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A "0" (zero) For The Said Item Would Mean That It Is Being Offered For Free To The Government. 15.3. All Duties, Taxes, And Other Levies Payable By The Contractor Under The Contract, Or For Any Other Cause, Prior To The Deadline For Submission Of Bids, Shall Be Included In The Rates, Prices, And Total Bid Price Submitted By The Bidder. 15.4. All Bid Prices For The Given Scope Of Work In The Contract As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Specified In Gcc Clause 48. Price Escalation May Be Allowed In Extraordinary Circumstances As May Be Determined By The National Economic And Development Authority In Accordance With The Civil Code Of The Philippines, And Upon The Recommendation Of The Procuring Entity. Furthermore, In Cases Where The Cost Of The Awarded Contract Is Affected By Any Applicable New Laws, Ordinances, Regulations, Or Other Acts Of The Gop, Promulgated After The Date Of Bid Opening, A Contract Price Adjustment Shall Be Made Or Appropriate Relief Shall Be Applied On A No Loss-no Gain Basis. 16. Bid Currencies 16.1. All Bid Prices Shall Be Quoted In Philippine Pesos Unless Otherwise Provided In The Bds. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate Prevailing On The Day Of The Bid Opening. 16.2. If So Allowed In Accordance With Itb Clause 16.1, The Procuring Entity For Purposes Of Bid Evaluation And Comparing The Bid Prices Will Convert The Amounts In Various Currencies In Which The Bid Price Is Expressed To Philippine Pesos At The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 16.3. Unless Otherwise Specified In The Bds, Payment Of The Contract Price Shall Be Made In Philippine Pesos. 17. Bid Validity 17.1. Bids Shall Remain Valid For The Period Specified In The Bds Which Shall Not Exceed One Hundred Twenty (120) Calendar Days From The Date Of The Opening Of Bids. 17.2. In Exceptional Circumstances, Prior To The Expiration Of The Bid Validity Period, The Procuring Entity May Request Bidders To Extend The Period Of Validity Of Their Bids. The Request And The Responses Shall Be Made In Writing. The Bid Security Described In Itb Clause 18 Should Also Be Extended Corresponding To The Extension Of The Bid Validity Period At The Least. A Bidder May Refuse The Request Without Forfeiting Its Bid Security, But His Bid Shall No Longer Be Considered For Further Evaluation And Award. A Bidder Granting The Request Shall Not Be Required Or Permitted To Modify Its Bid. 18. Bid Security 18.1. The Bid Security In The Amount Stated In The Bds Shall Be Equal To The Percentage Of The Abc In Accordance With The Following Schedule: Form Of Bid Security Amount Of Bid Security (equal To Percentage Of The Abc) (a) Cash Or Cashier’s/manager’s Check Issued By A Universal Or Commercial Bank. Two Percent (2%) (b) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank. (c) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security; And/or Five Percent (5%) (d) Any Combination Of The Foregoing. Proportionate To Share Of Form With Respect To Total Amount Of Security For Biddings Conducted By Local Government Units, The Bidder May Also Submit Bid Securities In The Form Of Cashier’s/manager’s Check, Bank Draft/guarantee, Or Irrevocable Letter Of Credit From Other Banks Certified By The Bsp As Authorized To Issue Such Financial Statement. 18.2. The Bid Security Should Be Valid For The Period Specified In The Bds. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 18.3. No Bid Securities Shall Be Returned To Bidders After The Opening Of Bids And Before Contract Signing, Except To Those That Failed Or Declared As Post-disqualified, Upon Submission Of A Written Waiver Of Their Right To File A Motion For Reconsideration And/or Protest. Without Prejudice On Its Forfeiture, Bid Securities Shall Be Returned Only After The Bidder With The Lowest Calculated Responsive Bid Has Signed The Contract And Furnished The Performance Security, But In No Case Later Than The Expiration Of The Bid Security Validity Period Indicated In Itb Clause 18.2. 18.4. Upon Signing And Execution Of The Contract, Pursuant To Itb Clause 31, And The Posting Of The Performance Security, Pursuant To Itb Clause 32, The Successful Bidder’s Bid Security Will Be Discharged, But In No Case Later Than The Bid Security Validity Period As Indicated In Itb Clause 18.2. 18.5. The Bid Security May Be Forfeited: (a) If A Bidder: (i) Withdraws Its Bid During The Period Of Bid Validity Specified In Itb Clause 17; (ii) Does Not Accept The Correction Of Errors Pursuant To Itb Clause 27.3(b); (iii) Fails To Submit The Requirements Within The Prescribed Period, Or A Finding Against Their Veracity, As Stated In Itb Clause 28.2; (iv) Submission Of Eligibility Requirements Containing False Information Or Falsified Documents; (v) Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding; (vi) Allowing The Use Of One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding; (vii) Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid; (viii) Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time; (ix) Refusal To Clarify Or Validate In Writing Its Bid During Post-qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification; (x) Any Documented Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor; (xi) Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared Successful; Or (xii) All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons. (b) If The Successful Bidder: (i) Fails To Sign The Contract In Accordance With Itb Clause 31; (ii) Fails To Furnish Performance Security In Accordance With Itb Clause 32. 19. Format And Signing Of Bids 19.1. Bidders Shall Submit Their Bids Through Their Duly Authorized Representative Using The Appropriate Forms Provided In Section Ix. Bidding Forms On Or Before The Deadline Specified In The Itb Clause 21 In Two (2) Separate Sealed Bid Envelopes, And Which Shall Be Submitted Simultaneously. The First Shall Contain The Technical Component Of The Bid, Including The Eligibility Requirements Under Itb Clause 12.1, And The Second Shall Contain The Financial Component Of The Bid. 19.2. Forms As Mentioned In Itb Clause 19.1 Must Be Completed Without Any Alterations To Their Format, And No Substitute Form Shall Be Accepted. All Blank Spaces Shall Be Filled In With The Information Requested. 19.3. The Bidder Shall Prepare An Original Of The First And Second Envelopes As Described In Itb Clauses 12 And 13. In Addition, The Bidder Shall Submit Copies Of The First And Second Envelopes. In The Event Of Any Discrepancy Between The Original And The Copies, The Original Shall Prevail. 19.4. The Bid, Except For Unamended Printed Literature, Shall Be Signed, And Each And Every Page Thereof Shall Be Initialed, By The Duly Authorized Representative/s Of The Bidder. 19.5. Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By The Duly Authorized Representative/s Of The Bidder. 20. Sealing And Marking Of Bids 20.1. Bidders Shall Enclose Their Original Eligibility And Technical Documents Described In Itb Clause 12, In One Sealed Envelope Marked “original - Technical Component”, And The Original Of Their Financial Component In Another Sealed Envelope Marked “original - Financial Component”, Sealing Them All In An Outer Envelope Marked “original Bid”. 20.2. Each Copy Of The First And Second Envelopes Shall Be Similarly Sealed Duly Marking The Inner Envelopes As “copy No. ___ - Technical Component” And “copy No. ___ – Financial Component” And The Outer Envelope As “copy No. ___”, Respectively. These Envelopes Containing The Original And The Copies Shall Then Be Enclosed In One Single Envelope. 20.3. The Original And The Number Of Copies Of The Bid As Indicated In The Bds Shall Be Typed Or Written In Indelible Ink And Shall Be Signed By The Bidder Or Its Duly Authorized Representative/s. 20.4. All Envelopes Shall: (a) Contain The Name Of The Contract To Be Bid In Capital Letters; (b) Bear The Name And Address Of The Bidder In Capital Letters; (c) Be Addressed To The Procuring Entity’s Bac Identified In Itb Clause 10.1; (d) Bear The Specific Identification Of This Bidding Process Indicated In The Invitation To Bid; And (e) Bear A Warning “do Not Open Before…” The Date And Time For The Opening Of Bids, In Accordance With Itb Clause 21. 20.5. If Bids Are Not Sealed And Marked As Required, The Procuring Entity Will Assume No Responsibility For The Misplacement Or Premature Opening Of The Bid. D. Submission And Opening Of Bids 21. Deadline For Submission Of Bids Bids Must Be Received By The Procuring Entity’s Bac At The Address And On Or Before The Date And Time Indicated In The Bds. 22. Late Bids Any Bid Submitted After The Deadline For Submission And Receipt Of Bids Prescribed By The Procuring Entity, Pursuant To Itb Clause 21, Shall Be Declared “late” And Shall Not Be Accepted By The Procuring Entity. 23. Modification And Withdrawal Of Bids 23.1. The Bidder May Modify Its Bid After It Has Been Submitted; Provided That The Modification Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. The Bidder Shall Not Be Allowed To Retrieve Its Original Bid, But Shall Be Allowed To Submit Another Bid Equally Sealed, Properly Identified, Linked To Its Original Bid Marked As “technical Modification” Or “financial Modification” And Stamped “received” By The Bac. Bid Modifications Received After The Applicable Deadline Shall Not Be Considered And Shall Be Returned To The Bidder Unopened. 23.2. A Bidder May, Through A Letter Of Withdrawal, Withdraw Its Bid After It Has Been Submitted, For Valid And Justifiable Reason; Provided That The Letter Of Withdrawal Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. 23.3. Bids Requested To Be Withdrawn In Accordance With Itb Clause 23.1 Shall Be Returned Unopened To The Bidders. A Bidder May Also Express Its Intention Not To Participate In The Bidding Through A Letter Which Should Reach And Be Stamped By The Bac Before The Deadline For Submission And Receipt Of Bids. A Bidder That Withdraws Its Bid Shall Not Be Permitted To Submit Another Bid, Directly Or Indirectly, For The Same Contract. 23.4. No Bid May Be Modified After The Deadline For Submission Of Bids. No Bid May Be Withdrawn In The Interval Between The Deadline For Submission Of Bids And The Expiration Of The Period Of Bid Validity Specified By The Bidder On The Financial Bid Form. Withdrawal Of A Bid During This Interval Shall Result In The Forfeiture Of The Bidder’s Bid Security, Pursuant To Itb Clause 18.5, And The Imposition Of Administrative, Civil, And Criminal Sanctions As Prescribed By Ra 9184 And Its Irr. 24. Opening And Preliminary Examination Of Bids 24.1. The Bac Shall Open The First Bid Envelopes Of Bidders In Public As Specified In The Bds To Determine Each Bidder’s Compliance With The Documents Prescribed In Itb Clause 12. For This Purpose, The Bac Shall Check The Submitted Documents Of Each Bidder Against A Checklist Of Required Documents To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion. If A Bidder Submits The Required Document, It Shall Be Rated “passed” For That Particular Requirement. In This Regard, Bids That Fail To Include Any Requirement Or Are Incomplete Or Patently Insufficient Shall Be Considered As “failed”. Otherwise, The Bac Shall Rate The Said First Bid Envelope As “passed”. 24.2. Unless Otherwise Specified In The Bds, Immediately After Determining Compliance With The Requirements In The First Envelope, The Bac Shall Forthwith Open The Second Bid Envelope Of Each Remaining Eligible Bidder Whose First Bid Envelope Was Rated “passed”. The Second Envelope Of Each Complying Bidder Shall Be Opened Within The Same Day. In Case One Or More Of The Requirements In The Second Envelope Of A Particular Bid Is Missing, Incomplete Or Patently Insufficient, And/or If The Submitted Total Bid Price Exceeds The Abc Unless Otherwise Provided In Itb Clause 13.1(b), The Bac Shall Rate The Bid Concerned As “failed”. Only Bids That Are Determined To Contain All The Bid Requirements For Both Components Shall Be Rated “passed” And Shall Immediately Be Considered For Evaluation And Comparison. 24.3. Letters Of Withdrawal Shall Be Read Out And Recorded During Bid Opening, And The Envelope Containing The Corresponding Withdrawn Bid Shall Be Returned To The Bidder Unopened. If The Withdrawing Bidder’s Representative Is In Attendance, The Original Bid And All Copies Thereof Shall Be Returned To The Representative During The Bid Opening. If The Representative Is Not In Attendance, The Bid Shall Be Returned Unopened By Registered Mail. The Bidder May Withdraw Its Bid Prior To The Deadline For The Submission And Receipt Of Bids, Provided That The Corresponding Letter Of Withdrawal Contains A Valid Authorization Requesting For Such Withdrawal, Subject To Appropriate Administrative Sanctions. 24.4. If A Bidder Has Previously Secured A Certification From The Procuring Entity To The Effect That It Has Previously Submitted The Above-enumerated Class “a” Documents, The Said Certification May Be Submitted In Lieu Of The Requirements Enumerated In Itb Clause 12.1(a), Items (i) To (vi). 24.5. In The Case Of An Eligible Foreign Bidder As Described In Itb Clause 5, The Class “a” Documents Enumerated In Itb Clause 12.1(a) May Be Substituted With The Appropriate Equivalent Documents, If Any, Issued By The Country Of The Foreign Bidder Concerned. 24.6. Each Partner Of A Joint Venture Agreement Shall Likewise Submit The Documents Required In Itb Clauses 12.1(a)(i) And 12.1(a)(ii). Submission Of Documents Required Under Itb Clauses 12.1(a)(iii) To 12.1(a)(vi) By Any Of The Joint Venture Partners Constitutes Compliance. 24.7. A Bidder Determined As “failed” Has Three (3) Calendar Days Upon Written Notice Or, If Present At The Time Of Bid Opening, Upon Verbal Notification Within Which To File A Request For Reconsideration With The Bac: Provided, However, That The Request For Reconsideration Shall Not Be Granted If It Is Established That The Finding Of Failure Is Due To The Fault Of The Bidder Concerned: Provided, Further, That The Bac Shall Decide On The Request For Reconsideration Within Seven (7) Calendar Days From Receipt Thereof. If A Failed Bidder Signifies His Intent To File A Request For Reconsideration, The Bac Shall Keep The Bid Envelopes Of The Said Failed Bidder Unopened And/or Duly Sealed Until Such Time That The Request For Reconsideration Or Protest Has Been Resolved. E. Evaluation And Comparison Of Bids 25. Process To Be Confidential 25.1. Members Of The Bac, Including Its Staff And Personnel, As Well As Its Secretariat And Twg, Are Prohibited From Making Or Accepting Any Kind Of Communication With Any Bidder Regarding The Evaluation Of Their Bids Until The Issuance Of The Notice Of Award, Unless N The Case Of Itb Clause 26. 25.2. Any Effort By A Bidder To Influence The Procuring Entity In The Procuring Entity’s Decision In Respect Of Bid Evaluation, Bid Comparison Or Contract Award Will Result In The Rejection Of The Bidder’s Bid. 26. Clarification Of Bids To Assist In The Evaluation, Comparison And Post-qualification Of The Bids, The Procuring Entity May Ask In Writing Any Bidder For A Clarification Of Its Bid. All Responses To Requests For Clarification Shall Be In Writing. Any Clarification Submitted By A Bidder In Respect To Its Bid And That Is Not In Response To A Request By The Procuring Entity Shall Not Be Considered 27. Detailed Evaluation And Comparison Of Bids 27.1. The Procuring Entity Will Undertake The Detailed Evaluation And Comparison Of Bids Which Have Passed The Opening And Preliminary Examination Of Bids, Pursuant To Itb Clause 24, In Order To Determine The Lowest Calculated Bid. 27.2. In Evaluating The Bids To Get The Lowest Calculated Bid, The Procuring Entity Shall Undertake The Following: (a) The Detailed Evaluation Of The Financial Component Of The Bids, To Establish The Correct Calculated Prices Of The Bids; And (b) The Ranking Of The Total Bid Prices As So Calculated From The Lowest To Highest. The Bid With The Lowest Price Shall Be Identified As The Lowest Calculated Bid. 27.3. The Procuring Entity's Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary “pass/fail” Criterion. The Bac Shall Consider The Following In The Evaluation Of Bids: (a) Completeness Of The Bid. Unless The Itb Specifically Allows Partial Bids, Bids Not Addressing Or Providing All Of The Required Items In The Schedule Of Requirements Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A "0" (zero) For The Said Item Would Mean That It Is Being Offered For Free To The Procuring Entity; And (b) Arithmetical Corrections. Consider Computational Errors And Omissions To Enable Proper Comparison Of All Eligible Bids. It May Also Consider Bid Modifications If Expressly Allowed In The Bds. Any Adjustment Shall Be Calculated In Monetary Terms To Determine The Calculated Prices. 27.4. Based On The Detailed Evaluation Of Bids, Those That Comply With The Above-mentioned Requirements Shall Be Ranked In The Ascending Order Of Their Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, To Identify The Lowest Calculated Bid. Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, Which Exceed The Abc Shall Not Be Considered, Unless Otherwise Indicated In The Bds. 27.5. The Procuring Entity’s Evaluation Of Bids Shall Only Be Based On The Bid Price Quoted In The Financial Bid Form 27.6. Bids Shall Be Evaluated On An Equal Footing To Ensure Fair Competition. For This Purpose, All Bidders Shall Be Required To Include In Their Bids The Cost Of All Taxes, Such As, But Not Limited To, Value Added Tax (vat), Income Tax, Local Taxes, And Other Fiscal Levies And Duties Which Shall Be Itemized In The Bid Form And Reflected In The Detailed Estimates. Such Bids, Including Said Taxes, Shall Be The Basis For Bid Evaluation And Comparison. 28. Post Qualification 28.1. The Procuring Entity Shall Determine To Its Satisfaction Whether The Bidder That Is Evaluated As Having Submitted The Lowest Calculated Bid (lcb) Complies With And Is Responsive To All The Requirements And Conditions Specified In Itb Clauses 5, 12, And 13. 28.2. Within A Non-extendible Period Of Three (3) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lcb, The Bidder Shall Submit The Following Documentary Requirements: (a) Tax Clearance Per Executive Order 398, Series Of 2005; (b) Latest Income And Business Tax Returns In The Form Specified In The Bds; (c) Certificate Of Philgeps Registration; And (d) Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. Failure Of The Bidder Declared As Lcb To Duly Submit The Requirements Under This Clause Or A Finding Against The Veracity Of Such, Shall Be Ground For Forfeiture Of The Bid Security And Disqualification Of The Bidder For Award. 28.3. The Determination Shall Be Based Upon An Examination Of The Documentary Evidence Of The Bidder’s Qualifications Submitted Pursuant To Itb Clauses 12 And 13, As Well As Other Information As The Procuring Entity Deems Necessary And Appropriate, Using A Non-discretionary “pass/fail” Criterion. 28.4. If The Bac Determines That The Bidder With The Lowest Calculated Bid Passes All The Criteria For Post-qualification, It Shall Declare The Said Bid As The Lowest Calculated Responsive Bid, And Recommend To The Head Of The Procuring Entity The Award Of Contract To The Said Bidder At Its Submitted Price Or Its Calculated Bid Price, Whichever Is Lower, Subject To Itb Clause 30.3. 28.5. A Negative Determination Shall Result In Rejection Of The Bidder’s Bid, In Which Event The Procuring Entity Shall Proceed To The Next Lowest Calculated Bid To Make A Similar Determination Of That Bidder’s Capabilities To Perform Satisfactorily. If The Second Bidder, However, Fails The Post Qualification, The Procedure For Post Qualification Shall Be Repeated For The Bidder With The Next Lowest Calculated Bid, And So On Until The Lowest Calculated And Responsive Bid Is Determined For Contract Award. 28.6. Within A Period Not Exceeding Seven (7) Calendar Days From The Date Of Receipt Of The Recommendation Of The Bac, The Head Of The Procuring Entity Shall Approve Or Disapprove The Said Recommendation. In The Case Of Government Owned And Government-owned And/or -controlled Corporations (goccs) And Government Financial Institutions (gfis), The Period Provided Herein Shall Be Fifteen (15) Calendar Days. 29. Reservation Clause 29.1. Notwithstanding The Eligibility Or Post-qualification Of A Bidder, The Procuring Entity Concerned Reserves The Right To Review Its Qualifications At Any Stage Of The Procurement Process If It Has Reasonable Grounds To Believe That A Misrepresentation Has Been Made By The Said Bidder, Or That There Has Been A Change In The Bidder’s Capability To Undertake The Project From The Time It Submitted Its Eligibility Requirements. Should Such Review Uncover Any Misrepresentation Made In The Eligibility And Bidding Requirements, Statements Or Documents, Or Any Changes In The Situation Of The Bidder Which Will Affect Its Capability To Undertake The Project So That It Fails The Preset Eligibility Or Bid Evaluation Criteria, The Procuring Entity Shall Consider The Said Bidder As Ineligible And Shall Disqualify It From Submitting A Bid Or From Obtaining An Award Or Contract. 29.2. Based On The Following Grounds, The Procuring Entity Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding At Any Time Prior To The Contract Award, Or Not To Award The Contract, Without Thereby Incurring Any Liability, And Make No Assurance That A Contract Shall Be Entered Into As A Result Of The Bidding: (a) If There Is Prima Facie Evidence Of Collusion Between Appropriate Public Officers Or Employees Of The Procuring Entity, Or Between The Bac And Any Of The Bidders, Or If The Collusion Is Between Or Among The Bidders Themselves, Or Between A Bidder And A Third Party, Including Any Act Which Restricts, Suppresses Or Nullifies Or Tends To Restrict, Suppress Or Nullify Competition; (b) If The Procuring Entity’s Bac Is Found To Have Failed In Following The Prescribed Bidding Procedures; Or (c) For Any Justifiable And Reasonable Ground Where The Award Of The Contract Will Not Redound To The Benefit Of The Government As Follows: (i) If The Physical And Economic Conditions Have Significantly Changed So As To Render The Project No Longer Economically, Financially Or Technically Feasible As Determined By The Head Of The Procuring Entity; (ii) If The Project Is No Longer Necessary As Determined By The Head Of The Procuring Entity; And (iii) If The Source Of Funds For The Project Has Been Withheld Or Reduced Through No Fault Of The Procuring Entity. 29.3. In Addition, The Procuring Entity May Likewise Declare A Failure Of Bidding When: (a) No Bids Are Received; (b) All Prospective Bidders Are Declared Ineligible; (c) All Bids Fail To Comply With All The Bid Requirements Or Fail Post-qualification; Or (d) The Bidder With The Lowest Calculated Responsive Bid Refuses, Without Justifiable Cause To Accept The Award Of Contract, And No Award Is Made. F. Award Of Contract 30. Contract Award 30.1. Subject To Itb Clause 28, The Procuring Entity Shall Award The Contract To The Bidder Whose Bid Has Been Determined To Be The Lowest Calculated And Responsive Bid (lcrb). 30.2. Prior To The Expiration Of The Period Of Bid Validity, The Procuring Entity Shall Notify The Successful Bidder In Writing That Its Bid Has Been Accepted, Through A Notice Of Award Received Personally Or Sent By Registered Mail Or Electronically, Receipt Of Which Must Be Confirmed In Writing Within Two (2) Days By The Lcrb And Submitted Personally Or Sent By Registered Mail Or Electronically To The Procuring Entity. 30.3. Notwithstanding The Issuance Of The Notice Of Award, Award Of Contract Shall Be Subject To The Following Conditions: (a) Submission Of The Following Documents Within The Prescribed Period From Receipt By The Bidder Of The Notice That It Has The Lowest Calculated And Responsive Bid: (i) Valid Jva, If Applicable, Within Ten (10) Calendar Days; (ii) Valid Pcab License And Registration For The Type And Cost Of The Contract To Be Bid For Foreign Bidders, Within Thirty (30) Calendar Days, If Allowed Under A Treaty Or International Or Executive Agreement Mentioned In Itb Clause 12.1(a)(iv); (b) Posting Of The Performance Security In Accordance With Itb Clause 32; (c) Signing Of The Contract As Provided In Itb Clause 31; And (d) Approval By Higher Authority, If Required. 31. Signing Of The Contract 31.1. At The Same Time As The Procuring Entity Notifies The Successful Bidder That Its Bid Has Been Accepted, The Procuring Entity Shall Send The Contract Form To The Bidder, Which Contract Has Been Provided In The Bidding Documents, Incorporating Therein All Agreements Between The Parties. 31.2. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award, The Successful Bidder Shall Post The Required Performance Security, Sign And Date The Contract And Return It To The Procuring Entity. 31.3. The Procuring Entity Shall Enter Into Contract With The Successful Bidder Within The Same Ten (10) Calendar Day Period Provided That All The Documentary Requirements Are Complied With. 31.4. The Following Documents Shall Form Part Of The Contract: (a) Contract Agreement; (b) Bidding Documents; (c) Winning Bidder’s Bid, Including The Technical And Financial Proposals, And All Other Documents/statements Submitted; (d) Performance Security; (e) Credit Line In Accordance With Itb Clause 5.5, If Applicable; (f) Notice Of Award Of Contract; And (g) Other Contract Documents That May Be Required By Existing Laws And/or Specified In The Bds. 32. Performance Security 32.1. To Guarantee The Faithful Performance By The Winning Bidder Of Its Obligations Under The Contract, It Shall Post A Performance Security Within A Maximum Period Of Ten (10) Calendar Days From The Receipt Of The Notice Of Award From The Procuring Entity And In No Case Later Than The Signing Of The Contract. 32.2. The Performance Security Shall Be Denominated In Philippine Pesos And Posted In Favor Of The Procuring Entity In An Amount Equal To The Percentage Of The Total Contract Price As Stated In The Bds In Accordance With The Following Schedule: 33. 33.1. Form Of Performance Security Amount Of Performance Security (equal To Percentage Of The Total Contract Price) (a) Cash Or Cashier’s/manager’s Check Issued By A Universal Or Commercial Bank. Ten Percent (10%) (b) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank. (c) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security; And/or Thirty Percent (30%) (d) Any Combination Of The Foregoing. Proportionate To Share Of Form With Respect To Total Amount Of Security 33.2. Failure Of The Successful Bidder To Comply With The Above-mentioned Requirement Shall Constitute Sufficient Ground For The Annulment Of The Award And Forfeiture Of The Bid Security, In Which Event The Procuring Entity Shall Initiate And Complete The Post Qualification Of The Second Lowest Calculated Bid. The Procedure Shall Be Repeated Until The Lowest Calculated And Responsive Bid Is Identified And Selected For Contract Award. However If No Bidder Passed Post-qualification, The Bac Shall Declare The Bidding A Failure And Conduct A Re-bidding With Re-advertisement. 34. Notice To Proceed 34.1. Within Three (3) Calendar Days From The Date Of Approval Of The Contract By The Appropriate Government Approving Authority, The Procuring Entity Shall Issue Its Notice To Proceed To The Bidder. 34.2. The Contract Effectivity Date Shall Be Provided In The Notice To Proceed By The Procuring Entity, Which Date Shall Not Be Later Than Seven (7) Calendar Days From The Issuance Of The Notice To Proceed. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 1.1 The Procuring Entity Is Lgu- Mapanas, Northern Samar. The Name Of The Contract Is Construction Of Siljagon Multi-purpose Gym Phase 2, Brgy. Siljagon, Mapanas N. Samar The Identification Number Of The Contract Is Pr No-2024-11-103___ 2 The Funding Source Is: 20% Economic Development Fund (edf) For Fy 2025. The Name Of The Project Is: Improvement Of Jubasan Barangay Road, Brgy. Jubasan, Mapanas N. Samar 3.1 No Further Instructions. 5.1 No Further Instructions. 5.2 Bidding Is Restricted To Eligible Bidders As Defined In Itb Clause 5.1. 5.4 For This Purpose, Similar Contracts Shall Refer To Bidder’s Annual Turnover From All Works Average Over The Last Three Years Shall Be Equal To 50% Of The Estimated Cost Of The Contract Being Procured. The Bidder Must Have Completed, Within The Past Ten (10) Years From The Submission Of Bids, A Single Contract That Is Similar To This Project, Equivalent To At Least Eighty Percent (80%) Of The Abc. 8.1 “subcontracting Is Not Allowed.” 8.2 “not Applicable”. 9.1 The Procuring Entity Will Hold A Pre-bid Conference For This Project On December 05, 2024 At 10:00 A.m. At Executive Conference 2nd Floor Of New Municipal Bldg. Mapanas, Northern Samar. 10.1 The Procuring Entity’s Address Is: The Municipality Of Mapanas, Province Of Northern Samar Ma. Teresa L. Minguez Lgu-bac Chairperson Tel. No. 09778033758 10.3 No Further Instructions. 12.1 Not Applicable 12.1(a)(i) “no Other Acceptable Proof Of Registration Is Recognized.” 12.1(a)(iv) No Further Instructions. 13.1 “no Additional Requirements” 13.1(b) The Abc Is Php1,980,781.48 Any Bid With A Financial Component Exceeding This Amount Shall Not Be Accepted. 14.2 “no Further Instructions.” 15.4 No Further Instruction. 16.1 The Bid Prices Shall Be Quoted In Philippine Pesos. 17.1 Bids Will Be Valid Until 60 Calendar Days After The Bid Submission Deadline Date As Prescribed By The Procuring Entity) 18.1 The Bid Security Shall Be In The Following Amount: 1. The Amount Of 39,615.63 If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; 2. The Amount Of P99,039.07 If Bid Security Is In Surety Bond; Or 3. Any Combination Of The Foregoing Proportionate To The Share Of Form With Respect To Total Amount Of Security. 18.2 The Bid Security Shall Be Valid Twenty Eight Days Beyond The Validity Period Of The Bid. 20.3 Each Bidder Shall Submit One Original And One Copy Of The First And Second Components Of Its Bid. 21 The Address For Submission Of Bids Is Ma. Teresa L. Minguez Lgu-bac Chairperson Bac Office @ Mpdo, 1st Floor, New Municipal Bldg. Municipality Of Mapanas, Northern Samar The Deadline For Submission Of Bids Is 9:00 A.m. On December 16 , 2024. 22 The Place Of Bid Opening Is Executive Conference Room, 2nd Floor, New Municipal Bldg. Municipality Of Mapanas, Northern Samar. The Date And Time Of Bid Opening Is December 16, 2024 At Exactly 10:00 A.m. 24.2 No Further Instructions. 27.3(b) Bid Modification Is Not Allowed. 27.4 No Further Instructions. 28.2(b) Bidders Have Option To Submit Manually Filed Tax Returns Or Tax Returns Filed Through The Electronic Filing And Payments System (efps). Note: The Latest Income And Business Tax Returns Are Those Within The Last Six Months Preceding The Date Of Bid Submission. 28.2(d) List Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It. 1. Taxpayer’s Identification Number 2. Vat Registration 3. Philippine Contractors Accreditation Board (pcab) License The Requirements Are Applicable Only In A Case Where The Lowest Calculated Bid (lcb) Is Submitted By A Domestic Bidder, And If The Lowest Calculated Bid (lcb) Is Submitted By A Foreign Bidder, This Requirements Are Not Applicable 31.4(g) List Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Department Of Labor And Employment, And Pert/cpm. 32.2 The Performance Security Shall Be In The Following Amount: 1. The Amount Of 10% Of Contract If Performance Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; 2. The Amount Of 30% Of Contract If Performance Security Is In Surety Bond; Or 3. Any Combination Of The Foregoing Proportionate To The Share Of Form With Respect To Total Amount Of Security. Section Iv. General Conditions Of Contract Table Of Contents 1. Definitions 41 2. Interpretation 43 3. Governing Language And Law 43 4. Communications 43 5. Possession Of Site 43 6. The Contractor’s Obligations 44 7. Performance Security 45 8. Subcontracting 46 9. Liquidated Damages 46 10. Site Investigation Reports 47 11. The Procuring Entity, Licenses And Permits 47 12. Contractor’s Risk And Warranty Security 47 13. Liability Of The Contractor 49 14. Procuring Entity’s Risk 49 15. Insurance 49 16. Termination For Default Of Contractor 51 17. Termination For Default Of Procuring Entity 51 18. Termination For Other Causes 52 19. Procedures For Termination Of Contracts 53 20. Force Majeure, Release From Performance 56 21. Resolution Of Disputes 56 22. Suspension Of Loan, Credit, Grant, Or Appropriation 57 23. Procuring Entity’s Representative’s Decisions 57 24. Approval Of Drawings And Temporary Works By The Procuring Entity’s Representative 57 25. Acceleration And Delays Ordered By The Procuring Entity’s Representative 58 26. Extension Of The Intended Completion Date 58 27. Right To Vary 58 28. Contractors Right To Claim 59 29. Dayworks 59 30. Early Warning 59 31. Program Of Work 59 32. Management Conferences 60 33. Bill Of Quantities 60 34. Instructions, Inspections And Audits 61 35. Identifying Defects 61 36. Cost Of Repairs 61 37. Correction Of Defects 61 38. Uncorrected Defects 62 39. Advance Payment 62 40. Progress Payments 62 41. Payment Certificates 63 42. Retention 63 43. Variation Orders 64 44. Contract Completion 66 45. Suspension Of Work 66 46. Payment On Termination 67 47. Extension Of Contract Time 67 48. Price Adjustment 68 49. Completion 68 50. Taking Over 69 51. Operating And Maintenance Manuals 69 1. Definitions For Purposes Of This Clause, Boldface Type Is Used To Identify Defined Terms. 1.1. The Arbiter Is The Person Appointed Jointly By The Procuring Entity And The Contractor To Resolve Disputes In The First Instance, As Provided For In Gcc Clause 21. 1.2. Bill Of Quantities Refers To A List Of The Specific Items Of The Work And Their Corresponding Unit Prices, Lump Sums, And/or Provisional Sums. 1.3. The Completion Date Is The Date Of Completion Of The Works As Certified By The Procuring Entity’s Representative, In Accordance With Gcc Clause 49. 1.4. The Contract Is The Contract Between The Procuring Entity And The Contractor To Execute, Complete, And Maintain The Works. 1.5. The Contract Price Is The Price Stated In The Letter Of Acceptance And Thereafter To Be Paid By The Procuring Entity To The Contractor For The Execution Of The Works In Accordance With This Contract. 1.6. Contract Time Extension Is The Allowable Period For The Contractor To Complete The Works In Addition To The Original Completion Date Stated In This Contract. 1.7. The Contractor Is The Juridical Entity Whose Proposal Has Been Accepted By The Procuring Entity And To Whom The Contract To Execute The Work Was Awarded. 1.8. The Contractor’s Bid Is The Signed Offer Or Proposal Submitted By The Contractor To The Procuring Entity In Response To The Bidding Documents. 1.9. Days Are Calendar Days; Months Are Calendar Months. 1.10. Dayworks Are Varied Work Inputs Subject To Payment On A Time Basis For The Contractor’s Employees And Equipment, In Addition To Payments For Associated Materials And Plant. 1.11. A Defect Is Any Part Of The Works Not Completed In Accordance With The Contract. 1.12. The Defects Liability Certificate Is The Certificate Issued By Procuring Entity’s Representative Upon Correction Of Defects By The Contractor. 1.13. The Defects Liability Period Is The One Year Period Between Contract Completion And Final Acceptance Within Which The Contractor Assumes The Responsibility To Undertake The Repair Of Any Damage To The Works At His Own Expense. 1.14. Drawings Are Graphical Presentations Of The Works. They Include All Supplementary Details, Shop Drawings, Calculations, And Other Information Provided Or Approved For The Execution Of This Contract. 1.15. Equipment Refers To All Facilities, Supplies, Appliances, Materials Or Things Required For The Execution And Completion Of The Work Provided By The Contractor And Which Shall Not Form Or Are Not Intended To Form Part Of The Permanent Works. 1.16. The Intended Completion Date Refers To The Date Specified In The Scc When The Contractor Is Expected To Have Completed The Works. The Intended Completion Date May Be Revised Only By The Procuring Entity’s Representative By Issuing An Extension Of Time Or An Acceleration Order. 1.17. Materials Are All Supplies, Including Consumables, Used By The Contractor For Incorporation In The Works. 1.18. The Notice To Proceed Is A Written Notice Issued By The Procuring Entity Or The Procuring Entity’s Representative To The Contractor Requiring The Latter To Begin The Commencement Of The Work Not Later Than A Specified Or Determinable Date. 1.19. Permanent Works All Permanent Structures And All Other Project Features And Facilities Required To Be Constructed And Completed In Accordance With This Contract Which Shall Be Delivered To The Procuring Entity And Which Shall Remain At The Site After The Removal Of All Temporary Works. 1.20. Plant Refers To The Machinery, Apparatus, And The Like Intended To Form An Integral Part Of The Permanent Works. 1.21. The Procuring Entity Is The Party Who Employs The Contractor To Carry Out The Works Stated In The Scc. 1.22. The Procuring Entity’s Representative Refers To The Head Of The Procuring Entity Or His Duly Authorized Representative, Identified In The Scc, Who Shall Be Responsible For Supervising The Execution Of The Works And Administering This Contract. 1.23. The Site Is The Place Provided By The Procuring Entity Where The Works Shall Be Executed And Any Other Place Or Places Which May Be Designated In The Scc, Or Notified To The Contractor By The Procuring Entity’s Representative As Forming Part Of The Site. 1.24. Site Investigation Reports Are Those That Were Included In The Bidding Documents And Are Factual And Interpretative Reports About The Surface And Subsurface Conditions At The Site. 1.25. Slippage Is A Delay In Work Execution Occurring When Actual Accomplishment Falls Below The Target As Measured By The Difference Between The Scheduled And Actual Accomplishment Of The Work By The Contractor As Established From The Work Schedule. This Is Actually Described As A Percentage Of The Whole Works. 1.26. Specifications Means The Description Of Works To Be Done And The Qualities Of Materials To Be Used, The Equipment To Be Installed And The Mode Of Construction. 1.27. The Start Date, As Specified In The Scc, Is The Date When The Contractor Is Obliged To Commence Execution Of The Works. It Does Not Necessarily Coincide With Any Of The Site Possession Dates. 1.28. A Subcontractor Is Any Person Or Organization To Whom A Part Of The Works Has Been Subcontracted By The Contractor, As Allowed By The Procuring Entity, But Not Any Assignee Of Such Person. 1.29. Temporary Works Are Works Designed, Constructed, Installed, And Removed By The Contractor That Are Needed For Construction Or Installation Of The Permanent Works. 1.30. Work(s)refer To The Permanent Works And Temporary Works To Be Executed By The Contractor In Accordance With This Contract, Including (i) The Furnishing Of All Labor, Materials, Equipment And Others Incidental, Necessary Or Convenient To The Complete Execution Of The Works; (ii) The Passing Of Any Tests Before Acceptance By The Procuring Entity’s Representative; (iii) And The Carrying Out Of All Duties And Obligations Of The Contractor Imposed By This Contract As Described In The Scc. 2. Interpretation 2.1. In Interpreting The Conditions Of Contract, Singular Also Means Plural, Male Also Means Female Or Neuter, And The Other Way Around. Headings Have No Significance. Words Have Their Normal Meaning Under The Language Of This Contract Unless Specifically Defined. The Procuring Entity’s Representative Will Provide Instructions Clarifying Queries About The Conditions Of Contract. 2.2. If Sectional Completion Is Specified In The Scc, References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Governing Language And Law 3.1. This Contract Has Been Executed In The English Language, Which Shall Be The Binding And Controlling Language For All Matters Relating To The Meaning Or Interpretation Of This Contract. All Correspondence And Other Documents Pertaining To This Contract Which Are Exchanged By The Parties Shall Be Written In English. 3.2. This Contract Shall Be Interpreted In Accordance With The Laws Of The Republic Of The Philippines. 4. Communications Communications Between Parties That Are Referred To In The Conditions Shall Be Effective Only When In Writing. A Notice Shall Be Effective Only When It Is Received By The Concerned Party. 5. Possession Of Site 5.1. On The Date Specified In The Scc, The Procuring Entity Shall Grant The Contractor Possession Of So Much Of The Site As May Be Required To Enable It To Proceed With The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 5.2. If Possession Of A Portion Is Not Given By The Date Stated In The Scc Clause 5.1, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contact Time To Address Such Delay Shall Be In Accordance With Gcc Clause 47. 5.3. The Contractor Shall Bear All Costs And Charges For Special Or Temporary Right-of-way Required By It In Connection With Access To The Site. The Contractor Shall Also Provide At His Own Cost Any Additional Facilities Outside The Site Required By It For Purposes Of The Works. 5.4. The Contractor Shall Allow The Procuring Entity’s Representative And Any Person Authorized By The Procuring Entity’s Representative Access To The Site And To Any Place Where Work In Connection With This Contract Is Being Carried Out Or Is Intended To Be Carried Out. 6. The Contractor’s Obligations 6.1. The Contractor Shall Carry Out The Works Properly And In Accordance With This Contract. The Contractor Shall Provide All Supervision, Labor, Materials, Plant And Contractor's Equipment, Which May Be Required. All Materials And Plant On Site Shall Be Deemed To Be The Property Of The Procuring Entity. 6.2. The Contractor Shall Commence Execution Of The Works On The Start Date And Shall Carry Out The Works In Accordance With The Program Of Work Submitted By The Contractor, As Updated With The Approval Of The Procuring Entity’s Representative, And Complete Them By The Intended Completion Date. 6.3. The Contractor Shall Be Responsible For The Safety Of All Activities On The Site. 6.4. The Contractor Shall Carry Out All Instructions Of The Procuring Entity’s Representative That Comply With The Applicable Laws Where The Site Is Located. 6.5. The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel, As Referred To In The Scc, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 6.6. If The Procuring Entity’s Representative Asks The Contractor To Remove A Member Of The Contractor’s Staff Or Work Force, For Justifiable Cause, The Contractor Shall Ensure That The Person Leaves The Site Within Seven (7) Days And Has No Further Connection With The Work In This Contract. 6.7. During Contract Implementation, The Contractor And His Subcontractors Shall Abide At All Times By All Labor Laws, Including Child Labor Related Enactments, And Other Relevant Rules. 6.8. The Contractor Shall Submit To The Procuring Entity For Consent The Name And Particulars Of The Person Authorized To Receive Instructions On Behalf Of The Contractor. 6.9. The Contractor Shall Cooperate And Share The Site With Other Contractors, Public Authorities, Utilities, And The Procuring Entity Between The Dates Given In The Schedule Of Other Contractors Particularly When They Shall Require Access To The Site. The Contractor Shall Also Provide Facilities And Services For Them During This Period. The Procuring Entity May Modify The Schedule Of Other Contractors, And Shall Notify The Contractor Of Any Such Modification Thereto. 6.10. Should Anything Of Historical Or Other Interest Or Of Significant Value Be Unexpectedly Discovered On The Site, It Shall Be The Property Of The Procuring Entity. The Contractor Shall Notify The Procuring Entity’s Representative Of Such Discoveries And Carry Out The Procuring Entity’s Representative’s Instructions In Dealing With Them. 7. Performance Security 7.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Contractor Shall Furnish The Performance Security In Any The Forms Prescribed In Itb Clause 32.2. 7.2. The Performance Security Posted In Favor Of The Procuring Entity Shall Be Forfeited In The Event It Is Established That The Contractor Is In Default In Any Of Its Obligations Under The Contract. 7.3. The Performance Security Shall Remain Valid Until Issuance By The Procuring Entity Of The Certificate Of Final Acceptance. 7.4. The Performance Security May Be Released By The Procuring Entity And Returned To The Contractor After The Issuance Of The Certificate Of Final Acceptance Subject To The Following Conditions: (a) There Are No Pending Claims Against The Contractor Or The Surety Company Filed By The Procuring Entity; (b) The Contractor Has No Pending Claims For Labor And Materials Filed Against It; And (c) Other Terms Specified In The Scc. 7.5. The Contractor Shall Post An Additional Performance Security Following The Amount And Form Specified In Itb Clause 32.2 To Cover Any Cumulative Increase Of More Than Ten Percent (10%) Over The Original Value Of The Contract As A Result Of Amendments To Order Or Change Orders, Extra Work Orders And Supplemental Agreements, As The Case May Be. The Contractor Shall Cause The Extension Of The Validity Of The Performance Security To Cover Approved Contract Time Extensions. 7.6. In Case Of A Reduction In The Contract Value Or For Partially Completed Works Under The Contract Which Are Usable And Accepted By The Procuring Entity The Use Of Which, In The Judgment Of The Implementing Agency Or The Procuring Entity, Will Not Affect The Structural Integrity Of The Entire Project, The Procuring Entity Shall Allow A Proportional Reduction In The Original Performance Security, Provided That Any Such Reduction Is More Than Ten Percent (10%) And That The Aggregate Of Such Reductions Is Not More Than Fifty Percent (50%) Of The Original Performance Security. 7.7. Unless Otherwise Indicated In The Scc, The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Act 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 8. Subcontracting 8.1. Unless Otherwise Indicated In The Scc, The Contractor Cannot Subcontract Works More Than The Percentage Specified In Itb Clause 8.1. 8.2. Subcontracting Of Any Portion Of The Works Does Not Relieve The Contractor Of Any Liability Or Obligation Under This Contract. The Contractor Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants Or Workmen. 8.3. Subcontractors Disclosed And Identified During The Bidding May Be Changed During The Implementation Of This Contract, Subject To Compliance With The Required Qualifications And The Approval Of The Procuring Entity. 9. Liquidated Damages 9.1. The Contractor Shall Pay Liquidated Damages To The Procuring Entity For Each Day That The Completion Date Is Later Than The Intended Completion Date. The Applicable Liquidated Damages Is At Least One-tenth (1/10) Of A Percent Of The Cost Of The Unperformed Portion For Every Day Of Delay. The Total Amount Of Liquidated Damages Shall Not Exceed Ten Percent (10%) Of The Amount Of The Contract. The Procuring Entity May Deduct Liquidated Damages From Payments Due To The Contractor. Payment Of Liquidated Damages Shall Not Affect The Contractor. Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of This Contract, The Procuring Entity Shall Rescind This Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. 9.2. If The Intended Completion Date Is Extended After Liquidated Damages Have Been Paid, The Engineer Of The Procuring Entity Shall Correct Any Overpayment Of Liquidated Damages By The Contractor By Adjusting The Next Payment Certificate. The Contractor Shall Be Paid Interest On The Overpayment, Calculated From The Date Of Payment To The Date Of Repayment, At The Rates Specified In Gcc Clause 40.3. 10. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 11. The Procuring Entity, Licenses And Permits The Procuring Entity Shall, If Requested By The Contractor, Assist Him In Applying For Permits, Licenses Or Approvals, Which Are Required For The Works. 12. Contractor’s Risk And Warranty Security 12.1. The Contractor Shall Assume Full Responsibility For The Works From The Time Project Construction Commenced Up To Final Acceptance By The Procuring Entity And Shall Be Held Responsible For Any Damage Or Destruction Of The Works Except Those Occasioned By Force Majeure. The Contractor Shall Be Fully Responsible For The Safety, Protection, Security, And Convenience Of His Personnel, Third Parties, And The Public At Large, As Well As The Works, Equipment, Installation, And The Like To Be Affected By His Construction Work. 12.2. The Defects Liability Period For Infrastructure Projects Shall Be One Year From Contract Completion Up To Final Acceptance By The Procuring Entity. During This Period, The Contractor Shall Undertake The Repair Works, At His Own Expense, Of Any Damage To The Works On Account Of The Use Of Materials Of Inferior Quality Within Ninety (90) Days From The Time The Head Of The Procuring Entity Has Issued An Order To Undertake Repair. In Case Of Failure Or Refusal To Comply With This Mandate, The Procuring Entity Shall Undertake Such Repair Works And Shall Be Entitled To Full Reimbursement Of Expenses Incurred Therein Upon Demand. 12.3. Unless Otherwise Indicated In The Scc, In Case The Contractor Fails To Comply With The Preceding Paragraph, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property (ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 12.4. After Final Acceptance Of The Works By The Procuring Entity, The Contractor Shall Be Held Responsible For “structural Defects”, I.e., Major Faults/flaws/deficiencies In One Or More Key Structural Elements Of The Project Which May Lead To Structural Failure Of The Completed Elements Or Structure, Or “structural Failures”, I.e., Where One Or More Key Structural Elements In An Infrastructure Facility Fails Or Collapses, Thereby Rendering The Facility Or Part Thereof Incapable Of Withstanding The Design Loads, And/or Endangering The Safety Of The Users Or The General Public: (a) Contractor – Where Structural Defects/failures Arise Due To Faults Attributable To Improper Construction, Use Of Inferior Quality/substandard Materials, And Any Violation Of The Contract Plans And Specifications, The Contractor Shall Be Held Liable; (b) Consultants – Where Structural Defects/failures Arise Due To Faulty And/or Inadequate Design And Specifications As Well As Construction Supervision, Then The Consultant Who Prepared The Design Or Undertook Construction Supervision For The Project Shall Be Held Liable; (c) Procuring Entity’s Representatives/project Manager/construction Managers And Supervisors – The Project Owner’s Representative(s), Project Manager, Construction Manager, And Supervisor(s) Shall Be Held Liable In Cases Where The Structural Defects/failures Are Due To His/their Willful Intervention In Altering The Designs And Other Specifications; Negligence Or Omission In Not Approving Or Acting On Proposed Changes To Noted Defects Or Deficiencies In The Design And/or Specifications; And The Use Of Substandard Construction Materials In The Project; (d) Third Parties - Third Parties Shall Be Held Liable In Cases Where Structural Defects/failures Are Caused By Work Undertaken By Them Such As Leaking Pipes, Diggings Or Excavations, Underground Cables And Electrical Wires, Underground Tunnel, Mining Shaft And The Like, In Which Case The Applicable Warranty To Such Structure Should Be Levied To Third Parties For Their Construction Or Restoration Works. (e) Users - In Cases Where Structural Defects/failures Are Due To Abuse/misuse By The End User Of The Constructed Facility And/or Non–compliance By A User With The Technical Design Limits And/or Intended Purpose Of The Same, Then The User Concerned Shall Be Held Liable. 12.5. The Warranty Against Structural Defects/failures, Except Those Occasioned On Force Majeure, Shall Cover The Period Specified In The Scc Reckoned From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. 12.6. The Contractor Shall Be Required To Put Up A Warranty Security In The Form Of Cash, Bank Guarantee, Letter Of Credit, Gsis Or Surety Bond Callable On Demand, In Accordance With The Following Schedule: Form Of Warranty Minimum Amount In Percentage (%) Of Total Contract Price (a) Cash Or Letter Of Credit Issued By Universal Or Commercial Bank: Provided, However, That The Letter Of Credit Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank Five Percent (5%) (b) Bank Guarantee Confirmed By Universal Or Commercial Bank: Provided, However, That The Letter Of Credit Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank Ten Percent (10%) (c) Surety Bond Callable Upon Demand Issued By Gsis Or Any Surety Or Insurance Company Duly Certified By The Insurance Commission Thirty Percent (30%) 12.7. The Warranty Security Shall Be Stated In Philippine Pesos And Shall Remain Effective For One Year From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity, And Returned Only After The Lapse Of Said One Year Period. 12.8. In Case Of Structural Defects/failure Occurring During The Applicable Warranty Period Provided In Gcc Clause 12.5, The Procuring Entity Shall Undertake The Necessary Restoration Or Reconstruction Works And Shall Be Entitled To Full Reimbursement By The Parties Found To Be Liable For Expenses Incurred Therein Upon Demand, Without Prejudice To The Filing Of Appropriate Administrative, Civil, And/or Criminal Charges Against The Responsible Persons As Well As The Forfeiture Of The Warranty Security Posted In Favor Of The Procuring Entity. 13. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. 14. Procuring Entity’s Risk 14.1. From The Start Date Until The Certificate Of Final Acceptance Has Been Issued, The Following Are Risks Of The Procuring Entity: (a) The Risk Of Personal Injury, Death, Or Loss Of Or Damage To Property (excluding The Works, Plant, Materials, And Equipment), Which Are Due To: (i) Any Type Of Use Or Occupation Of The Site Authorized By The Procuring Entity After The Official Acceptance Of The Works; Or (ii) Negligence, Breach Of Statutory Duty, Or Interference With Any Legal Right By The Procuring Entity Or By Any Person Employed By Or Contracted To Him Except The Contractor. (b) The Risk Of Damage To The Works, Plant, Materials, And Equipment To The Extent That It Is Due To A Fault Of The Procuring Entity Or In The Procuring Entity’s Design, Or Due To War Or Radioactive Contamination Directly Affecting The Country Where The Works Are To Be Executed. 15. Insurance 15.1. The Contractor Shall, Under His Name And At His Own Expense, Obtain And Maintain, For The Duration Of This Contract, The Following Insurance Coverage: (a) Contractor’s All Risk Insurance; (b) Transportation To The Project Site Of Equipment, Machinery, And Supplies Owned By The Contractor; (c) Personal Injury Or Death Of Contractor’s Employees; And (d) Comprehensive Insurance For Third Party Liability To Contractor’s Direct Or Indirect Act Or Omission Causing Damage To Third Persons. 15.2. The Contractor Shall Provide Evidence To The Procuring Entity’s Representative That The Insurances Required Under This Contract Have Been Effected And Shall, Within A Reasonable Time, Provide Copies Of The Insurance Policies To The Procuring Entity’s Representative. Such Evidence And Such Policies Shall Be Provided To The Procuring Entity’s Through The Procuring Entity’s Representative. 15.3. The Contractor Shall Notify The Insurers Of Changes In The Nature, Extent, Or Program For The Execution Of The Works And Ensure The Adequacy Of The Insurances At All Times In Accordance With The Terms Of This Contract And Shall Produce To The Procuring Entity’s Representative The Insurance Policies In Force Including The Receipts For Payment Of The Current Premiums. The Above Insurance Policies Shall Be Obtained From Any Reputable Insurance Company Approved By The Procuring Entity’s Representative. 15.4. If The Contractor Fails To Obtain And Keep In Force The Insurances Referred To Herein Or Any Other Insurance Which He May Be Required To Obtain Under The Terms Of This Contract, The Procuring Entity May Obtain And Keep In Force Any Such Insurances And Pay Such Premiums As May Be Necessary For The Purpose. From Time To Time, The Procuring Entity May Deduct The Amount It Shall Pay For Said Premiums Including Twenty Five Percent (25%) Therein From Any Monies Due, Or Which May Become Due, To The Contractor, Without Prejudice To The Procuring Entity Exercising Its Right To Impose Other Sanctions Against The Contractor Pursuant To The Provisions Of This Contract. 15.5. In The Event The Contractor Fails To Observe The Above Safeguards, The Procuring Entity May, At The Contractor’s Expense, Take Whatever Measure Is Deemed Necessary For Its Protection And That Of The Contractor’s Personnel And Third Parties, And/or Order The Interruption Of Dangerous Works. In Addition, The Procuring Entity May Refuse To Make The Payments Under Gcc Clause 40 Until The Contractor Complies With This Clause. 15.6. The Contractor Shall Immediately Replace The Insurance Policy Obtained As Required In This Contract, Without Need Of The Procuring Entity’s Demand, With A New Policy Issued By A New Insurance Company Acceptable To The Procuring Entity For Any Of The Following Grounds: (a) The Issuer Of The Insurance Policy To Be Replaced Has: (i) Become Bankrupt; (ii) Been Placed Under Receivership Or Under A Management Committee; (iii) Been Sued For Suspension Of Payment; Or (iv) Been Suspended By The Insurance Commission And Its License To Engage In Business Or Its Authority To Issue Insurance Policies Cancelled; Or (v) Where Reasonable Grounds Exist That The Insurer May Not Be Able, Fully And Promptly, To Fulfill Its Obligation Under The Insurance Policy. 16. Termination For Default Of Contractor 16.1. The Procuring Entity Shall Terminate This Contract For Default When Any Of The Following Conditions Attend Its Implementation: 16.2. Due To The Contractor’s Fault And While The Project Is On-going, It Has Incurred Negative Slippage Of Fifteen Percent (15%) Or More In Accordance With Presidential Decree 1870, Regardless Of Whether Or Not Previous Warnings And Notices Have Been Issued For The Contractor To Improve His Performance; 16.3. Due To Its Own Fault And After This Contract Time Has Expired, The Contractor Incurs Delay In The Completion Of The Work After This Contract Has Expired; Or 16.4. The Contractor: (a) Abandons The Contract Works, Refuses Or Fails To Comply With A Valid Instruction Of The Procuring Entity Or Fails To Proceed Expeditiously And Without Delay Despite A Written Notice By The Procuring Entity; (b) Does Not Actually Have On The Project Site The Minimum Essential Equipment Listed On The Bid Necessary To Prosecute The Works In Accordance With The Approved Program Of Work And Equipment Deployment Schedule As Required For The Project; (c) Does Not Execute The Works In Accordance With This Contract Or Persistently Or Flagrantly Neglects To Carry Out Its Obligations Under This Contract; (d) Neglects Or Refuses To Remove Materials Or To Perform A New Work That Has Been Rejected As Defective Or Unsuitable; Or (e) Sub-lets Any Part Of This Contract Without Approval By The Procuring Entity. 16.5. All Materials On The Site, Plant, Equipment, And Works Shall Be Deemed To Be The Property Of The Procuring Entity If This Contract Is Rescinded Because Of The Contractor’s Default. 17. Termination For Default Of Procuring Entity The Contractor May Terminate This Contract With The Procuring Entity If The Works Are Completely Stopped For A Continuous Period Of At Least Sixty (60) Calendar Days Through No Fault Of Its Own, Due To Any Of The Following Reasons: (a) Failure Of The Procuring Entity To Deliver, Within A Reasonable Time, Supplies, Materials, Right-of-way, Or Other Items It Is Obligated To Furnish Under The Terms Of This Contract; Or (b) The Prosecution Of The Work Is Disrupted By The Adverse Peace And Order Situation, As Certified By The Armed Forces Of The Philippines Provincial Commander And Approved By The Secretary Of National Defense. 18. Termination For Other Causes 18.1. The Procuring Entity May Terminate This Contract, In Whole Or In Part, At Any Time For Its Convenience. The Head Of The Procuring Entity May Terminate This Contract For The Convenience Of The Procuring Entity If He Has Determined The Existence Of Conditions That Make Project Implementation Economically, Financially Or Technically Impractical And/or Unnecessary, Such As, But Not Limited To, Fortuitous Event(s) Or Changes In Law And National Government Policies. 18.2. The Procuring Entity Or The Contractor May Terminate This Contract If The Other Party Causes A Fundamental Breach Of This Contract. 18.3. Fundamental Breaches Of Contract Shall Include, But Shall Not Be Limited To, The Following: (a) The Contractor Stops Work For Twenty Eight (28) Days When No Stoppage Of Work Is Shown On The Current Program Of Work And The Stoppage Has Not Been Authorized By The Procuring Entity’s Representative; (b) The Procuring Entity’s Representative Instructs The Contractor To Delay The Progress Of The Works, And The Instruction Is Not Withdrawn Within Twenty Eight (28) Days; (c) The Procuring Entity Shall Terminate This Contract If The Contractor Is Declared Bankrupt Or Insolvent As Determined With Finality By A Court Of Competent Jurisdiction. In This Event, Termination Will Be Without Compensation To The Contractor, Provided That Such Termination Will Not Prejudice Or Affect Any Right Of Action Or Remedy Which Has Accrued Or Will Accrue Thereafter To The Procuring Entity And/or The Contractor. In The Case Of The Contractor's Insolvency, Any Contractor's Equipment Which The Procuring Entity Instructs In The Notice Is To Be Used Until The Completion Of The Works; (d) A Payment Certified By The Procuring Entity’s Representative Is Not Paid By The Procuring Entity To The Contractor Within Eighty Four (84) Days From The Date Of The Procuring Entity’s Representative’s Certificate; (e) The Procuring Entity’s Representative Gives Notice That Failure To Correct A Particular Defect Is A Fundamental Breach Of Contract And The Contractor Fails To Correct It Within A Reasonable Period Of Time Determined By The Procuring Entity’s Representative; (f) The Contractor Does Not Maintain A Security, Which Is Required; (g) The Contractor Has Delayed The Completion Of The Works By The Number Of Days For Which The Maximum Amount Of Liquidated Damages Can Be Paid, As Defined In The Gcc Clause 9; And (h) In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To, The Following: (i) Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Defined In Itb Clause 3.1(a), Unless Otherwise Specified In The Scc; (ii) Drawing Up Or Using Forged Documents; (iii) Using Adulterated Materials, Means Or Methods, Or Engaging In Production Contrary To Rules Of Science Or The Trade; And (iv) Any Other Act Analogous To The Foregoing. 18.4. The Funding Source Or The Procuring Entity, As Appropriate, Will Seek To Impose The Maximum Civil, Administrative And/or Criminal Penalties Available Under The Applicable Law On Individuals And Organizations Deemed To Be Involved With Corrupt, Fraudulent, Or Coercive Practices. 18.5. When Persons From Either Party To This Contract Gives Notice Of A Fundamental Breach To The Procuring Entity’s Representative In Order To Terminate The Existing Contract For A Cause Other Than Those Listed Under Gcc Clause 18.3, The Procuring Entity’s Representative Shall Decide Whether The Breach Is Fundamental Or Not. 18.6. If This Contract Is Terminated, The Contractor Shall Stop Work Immediately, Make The Site Safe And Secure, And Leave The Site As Soon As Reasonably Possible. 19. Procedures For Termination Of Contracts 19.1. The Following Provisions Shall Govern The Procedures For The Termination Of This Contract: (a) Upon Receipt Of A Written Report Of Acts Or Causes Which May Constitute Ground(s) For Termination As Aforementioned, Or Upon Its Own Initiative, The Procuring Entity Shall, Within A Period Of Seven (7) Calendar Days, Verify The Existence Of Such Ground(s) And Cause The Execution Of A Verified Report, With All Relevant Evidence Attached; (b) Upon Recommendation By The Procuring Entity, The Head Of The Procuring Entity Shall Terminate This Contract Only By A Written Notice To The Contractor Conveying The Termination Of This Contract. The Notice Shall State: (i) That This Contract Is Being Terminated For Any Of The Ground(s) Afore-mentioned, And A Statement Of The Acts That Constitute The Ground(s) Constituting The Same; (ii) The Extent Of Termination, Whether In Whole Or In Part; (iii) An Instruction To The Contractor To Show Cause As To Why This Contract Should Not Be Terminated; And (iv) Special Instructions Of The Procuring Entity, If Any. The Notice To Terminate Shall Be Accompanied By A Copy Of The Verified Report; (c) Within A Period Of Seven (7) Calendar Days From Receipt Of The Notice Of Termination, The Contractor Shall Submit To The Head Of The Procuring Entity A Verified Position Paper Stating Why The Contract Should Not Be Terminated. If The Contractor Fails To Show Cause After The Lapse Of The Seven (7) Day Period, Either By Inaction Or By Default, The Head Of The Procuring Entity Shall Issue An Order Terminating The Contract; (d) The Procuring Entity May, At Anytime Before Receipt Of The Bidder’s Verified Position Paper Described In Item (c) Above Withdraw The Notice To Terminate If It Is Determined That Certain Items Or Works Subject Of The Notice Had Been Completed, Delivered, Or Performed Before The Contractor’s Receipt Of The Notice; (e) Within A Non-extendible Period Of Ten (10) Calendar Days From Receipt Of The Verified Position Paper, The Head Of The Procuring Entity Shall Decide Whether Or Not To Terminate This Contract. It Shall Serve A Written Notice To The Contractor Of Its Decision And, Unless Otherwise Provided In The Said Notice, This Contract Is Deemed Terminated From Receipt Of The Contractor Of The Notice Of Decision. The Termination Shall Only Be Based On The Ground(s) Stated In The Notice To Terminate; And (f) The Head Of The Procuring Entity May Create A Contract Termination Review Committee (ctrc) To Assist Him In The Discharge Of This Function. All Decisions Recommended By The Ctrc Shall Be Subject To The Approval Of The Head Of The Procuring Entity. 19.2. Pursuant To Section 69(f) Of Ra 9184 And Without Prejudice To The Imposition Of Additional Administrative Sanctions As The Internal Rules Of The Agency May Provide And/or Further Criminal Prosecution As Provided By Applicable Laws, The Procuring Entity Shall Impose On Contractors After The Termination Of The Contract The Penalty Of Suspension For One (1) Year For The First Offense, Suspension For Two (2) Years For The Second Offense From Participating In The Public Bidding Process, For Violations Committed During The Contract Implementation Stage, Which Include But Not Limited To The Following: (a) Failure Of The Contractor, Due Solely To His Fault Or Negligence, To Mobilize And Start Work Or Performance Within The Specified Period In The Notice To Proceed (“ntp”); (b) Failure By The Contractor To Fully And Faithfully Comply With Its Contractual Obligations Without Valid Cause, Or Failure By The Contractor To Comply With Any Written Lawful Instruction Of The Procuring Entity Or Its Representative(s) Pursuant To The Implementation Of The Contract. For The Procurement Of Infrastructure Projects Or Consultancy Contracts, Lawful Instructions Include But Are Not Limited To The Following: (i) Employment Of Competent Technical Personnel, Competent Engineers And/or Work Supervisors; (ii) Provision Of Warning Signs And Barricades In Accordance With Approved Plans And Specifications And Contract Provisions; (iii) Stockpiling In Proper Places Of All Materials And Removal From The Project Site Of Waste And Excess Materials, Including Broken Pavement And Excavated Debris In Accordance With Approved Plans And Specifications And Contract Provisions; (iv) Deployment Of Committed Equipment, Facilities, Support Staff And Manpower; And (v) Renewal Of The Effectivity Dates Of The Performance Security After Its Expiration During The Course Of Contract Implementation. (c) Assignment And Subcontracting Of The Contract Or Any Part Thereof Or Substitution Of Key Personnel Named In The Proposal Without Prior Written Approval By The Procuring Entity. (d) Poor Performance By The Contractor Or Unsatisfactory Quality And/or Progress Of Work Arising From His Fault Or Negligence As Reflected In The Constructor's Performance Evaluation System (“cpes”) Rating Sheet. In The Absence Of The Cpes Rating Sheet, The Existing Performance Monitoring System Of The Procuring Entity Shall Be Applied. Any Of The Following Acts By The Contractor Shall Be Construed As Poor Performance: (i) Negative Slippage Of 15% And Above Within The Critical Path Of The Project Due Entirely To The Fault Or Negligence Of The Contractor; And (ii) Quality Of Materials And Workmanship Not Complying With The Approved Specifications Arising From The Contractor's Fault Or Negligence. (e) Willful Or Deliberate Abandonment Or Non-performance Of The Project Or Contract By The Contractor Resulting To Substantial Breach Thereof Without Lawful And/or Just Cause. In Addition To The Penalty Of Suspension, The Performance Security Posted By The Contractor Shall Also Be Forfeited. 20. Force Majeure, Release From Performance 20.1. For Purposes Of This Contract The Terms “force Majeure” And “fortuitous Event” May Be Used Interchangeably. In This Regard, A Fortuitous Event Or Force Majeure Shall Be Interpreted To Mean An Event Which The Contractor Could Not Have Foreseen, Or Which Though Foreseen, Was Inevitable. It Shall Not Include Ordinary Unfavorable Weather Conditions; And Any Other Cause The Effects Of Which Could Have Been Avoided With The Exercise Of Reasonable Diligence By The Contractor. 20.2. If This Contract Is Discontinued By An Outbreak Of War Or By Any Other Event Entirely Outside The Control Of Either The Procuring Entity Or The Contractor, The Procuring Entity’s Representative Shall Certify That This Contract Has Been Discontinued. The Contractor Shall Make The Site Safe And Stop Work As Quickly As Possible After Receiving This Certificate And Shall Be Paid For All Works Carried Out Before Receiving It And For Any Work Carried Out Afterwards To Which A Commitment Was Made. 20.3. If The Event Continues For A Period Of Eighty Four (84) Days, Either Party May Then Give Notice Of Termination, Which Shall Take Effect Twenty Eight (28) Days After The Giving Of The Notice. 20.4. After Termination, The Contractor Shall Be Entitled To Payment Of The Unpaid Balance Of The Value Of The Works Executed And Of The Materials And Plant Reasonably Delivered To The Site, Adjusted By The Following: (a) Any Sum To Which The Contractor Is Entitled Under Gcc Clause 28; (b) The Cost Of His Suspension And Demobilization; (c) Any Sum To Which The Procuring Entity Is Entitled. 20.5. The Net Balance Due Shall Be Paid Or Repaid Within A Reasonable Time Period From The Time Of The Notice Of Termination. 21. Resolution Of Disputes 21.1. If Any Dispute Or Difference Of Any Kind Whatsoever Shall Arise Between The Parties In Connection With The Implementation Of The Contract Covered By The Act And This Irr, The Parties Shall Make Every Effort To Resolve Amicably Such Dispute Or Difference By Mutual Consultation. 21.2. If The Contractor Believes That A Decision Taken By The Procuring Entity’s Representative Was Either Outside The Authority Given To The Procuring Entity’s Representative By This Contract Or That The Decision Was Wrongly Taken, The Decision Shall Be Referred To The Arbiter Indicated In The Scc Within Fourteen (14) Days Of The Notification Of The Procuring Entity’s Representative’s Decision. 21.3. Any And All Disputes Arising From The Implementation Of This Contract Covered By The R.a. 9184 And Its Irr Shall Be Submitted To Arbitration In The Philippines According To The Provisions Of Republic Act No. 876, Otherwise Known As The “ Arbitration Law” And Republic Act 9285, Otherwise Known As The “alternative Dispute Resolution Act Of 2004”: Provided, However, That, Disputes That Are Within The Competence Of The Construction Industry Arbitration Commission To Resolve Shall Be Referred Thereto. The Process Of Arbitration Shall Be Incorporated As A Provision In This Contract That Will Be Executed Pursuant To The Provisions Of The Act And Its Irr: Provided, Further, That, By Mutual Agreement, The Parties May Agree In Writing To Resort To Other Alternative Modes Of Dispute Resolution. 22. Suspension Of Loan, Credit, Grant, Or Appropriation In The Event That The Funding Source Suspends The Loan, Credit, Grant, Or Appropriation To The Procuring Entity, From Which Part Of The Payments To The Contractor Are Being Made: (a) The Procuring Entity Is Obligated To Notify The Contractor Of Such Suspension Within Seven (7) Days Of Having Received The Suspension Notice. (b) If The Contractor Has Not Received Sums Due It For Work Already Done Within Forty Five (45) Days From The Time The Contractor’s Claim For Payment Has Been Certified By The Procuring Entity’s Representative, The Contractor May Immediately Issue A Suspension Of Work Notice In Accordance With Gcc Clause 45.2. 23. Procuring Entity’s Representative’s Decisions 23.1. Except Where Otherwise Specifically Stated, The Procuring Entity’s Representative Will Decide Contractual Matters Between The Procuring Entity And The Contractor In The Role Representing The Procuring Entity. 23.2. The Procuring Entity’s Representative May Delegate Any Of His Duties And Responsibilities To Other People, Except To The Arbiter, After Notifying The Contractor, And May Cancel Any Delegation After Notifying The Contractor. 24. Approval Of Drawings And Temporary Works By The Procuring Entity’s Representative 24.1. All Drawings Prepared By The Contractor For The Execution Of The Temporary Works, Are Subject To Prior Approval By The Procuring Entity’s Representative Before Its Use. 24.2. The Contractor Shall Be Responsible For Design Of Temporary Works. 24.3. The Procuring Entity’s Representative’s Approval Shall Not Alter The Contractor’s Responsibility For Design Of The Temporary Works. 24.4. The Contractor Shall Obtain Approval Of Third Parties To The Design Of The Temporary Works, When Required By The Procuring Entity. 25. Acceleration And Delays Ordered By The Procuring Entity’s Representative 25.1. When The Procuring Entity Wants The Contractor To Finish Before The Intended Completion Date, The Procuring Entity’s Representative Will Obtain Priced Proposals For Achieving The Necessary Acceleration From The Contractor. If The Procuring Entity Accepts These Proposals, The Intended Completion Date Will Be Adjusted Accordingly And Confirmed By Both The Procuring Entity And The Contractor. 25.2. If The Contractor’s Financial Proposals For An Acceleration Are Accepted By The Procuring Entity, They Are Incorporated In The Contract Price And Treated As A Variation. 26. Extension Of The Intended Completion Date 26.1. The Procuring Entity’s Representative Shall Extend The Intended Completion Date If A Variation Is Issued Which Makes It Impossible For The Intended Completion Date To Be Achieved By The Contractor Without Taking Steps To Accelerate The Remaining Work, Which Would Cause The Contractor To Incur Additional Costs. No Payment Shall Be Made For Any Event Which May Warrant The Extension Of The Intended Completion Date. 26.2. The Procuring Entity’s Representative Shall Decide Whether And By How Much To Extend The Intended Completion Date Within Twenty One (21) Days Of The Contractor Asking The Procuring Entity’s Representative For A Decision Thereto After Fully Submitting All Supporting Information. If The Contractor Has Failed To Give Early Warning Of A Delay Or Has Failed To Cooperate In Dealing With A Delay, The Delay By This Failure Shall Not Be Considered In Assessing The New Intended Completion Date. 27. Right To Vary 27.1. The Procuring Entity’s Representative With The Prior Approval Of The Procuring Entity May Instruct Variations, Up To A Maximum Cumulative Amount Of Ten Percent (10%) Of The Original Contract Cost. 27.2. Variations Shall Be Valued As Follows: (a) At A Lump Sum Price Agreed Between The Parties; (b) Where Appropriate, At Rates In This Contract; (c) In The Absence Of Appropriate Rates, The Rates In This Contract Shall Be Used As The Basis For Valuation; Or Failing Which (d) At Appropriate New Rates, Equal To Or Lower Than Current Industry Rates And To Be Agreed Upon By Both Parties And Approved By The Head Of The Procuring Entity. 28. Contractor's Right To Claim If The Contractor Incurs Cost As A Result Of Any Of The Events Under Gcc Clause 13, The Contractor Shall Be Entitled To The Amount Of Such Cost. If As A Result Of Any Of The Said Events, It Is Necessary To Change The Works, This Shall Be Dealt With As A Variation. 29. Dayworks 29.1. Subject To Gcc Clause 43 On Variation Order, And If Applicable As Indicated In The Scc, The Day Works Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 29.2. All Work To Be Paid For As Day Works Shall Be Recorded By The Contractor On Forms Approved By The Procuring Entity’s Representative. Each Completed Form Shall Be Verified And Signed By The Procuring Entity’s Representative Within Two Days Of The Work Being Done. 29.3. The Contractor Shall Be Paid For Day Works Subject To Obtaining Signed Dayworks Forms. 30. Early Warning 30.1. The Contractor Shall Warn The Procuring Entity’s Representative At The Earliest Opportunity Of Specific Likely Future Events Or Circumstances That May Adversely Affect The Quality Of The Work, Increase The Contract Price, Or Delay The Execution Of The Works. The Procuring Entity’s Representative May Require The Contractor To Provide An Estimate Of The Expected Effect Of The Future Event Or Circumstance On The Contract Price And Completion Date. The Estimate Shall Be Provided By The Contractor As Soon As Reasonably Possible. 30.2. The Contractor Shall Cooperate With The Procuring Entity’s Representative In Making And Considering Proposals For How The Effect Of Such An Event Or Circumstance Can Be Avoided Or Reduced By Anyone Involved In The Work And In Carrying Out Any Resulting Instruction Of The Procuring Entity’s Representative. 31. Program Of Work 31.1. Within The Time Stated In The Scc, The Contractor Shall Submit To The Procuring Entity’s Representative For Approval A Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. 31.2. An Update Of The Program Of Work Shall The Show The Actual Progress Achieved On Each Activity And The Effect Of The Progress Achieved On The Timing Of The Remaining Work, Including Any Changes To The Sequence Of The Activities. 31.3. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 31.4. The Procuring Entity’s Representative’s Approval Of The Program Of Work Shall Not Alter The Contractor’s Obligations. The Contractor May Revise The Program Of Work And Submit It To The Procuring Entity’s Representative Again At Any Time. A Revised Program Of Work Shall Show The Effect Of Any Approved Variations. 31.5. When The Program Of Work Is Updated, The Contractor Shall Provide The Procuring Entity’s Representative With An Updated Cash Flow Forecast. The Cash Flow Forecast Shall Include Different Currencies, As Defined In The Contract, Converted As Necessary Using The Contract Exchange Rates. 31.6. All Variations Shall Be Included In Updated Program Of Work Produced By The Contractor. 32. Management Conferences 32.1. Either The Procuring Entity’s Representative Or The Contractor May Require The Other To Attend A Management Conference. The Management Conference Shall Review The Plans For Remaining Work And Deal With Matters Raised In Accordance With The Early Warning Procedure. 32.2. The Procuring Entity’s Representative Shall Record The Business Of Management Conferences And Provide Copies Of The Record To Those Attending The Conference And To The Procuring Entity . The Responsibility Of The Parties For Actions To Be Taken Shall Be Decided By The Procuring Entity’s Representative Either At The Management Conference Or After The Management Conference And Stated In Writing To All Who Attended The Conference. 33. Bill Of Quantities 33.1. The Bill Of Quantities Shall Contain Items Of Work For The Construction, Installation, Testing, And Commissioning Of Work To Be Done By The Contractor. 33.2. The Bill Of Quantities Is Used To Calculate The Contract Price. The Contractor Is Paid For The Quantity Of The Work Done At The Rate In The Bill Of Quantities For Each Item. 33.3. If The Final Quantity Of Any Work Done Differs From The Quantity In The Bill Of Quantities For The Particular Item And Is Not More Than Twenty Five Percent (25%) Of The Original Quantity, Provided The Aggregate Changes For All Items Do Not Exceed Ten Percent (10%) Of The Contract Price, The Procuring Entity’s Representative Shall Make The Necessary Adjustments To Allow For The Changes Subject To Applicable Laws, Rules, And Regulations. 33.4. If Requested By The Procuring Entity’s Representative, The Contractor Shall Provide The Procuring Entity’s Representative With A Detailed Cost Breakdown Of Any Rate In The Bill Of Quantities. 34. Instructions, Inspections And Audits 34.1. The Procuring Entity’s Personnel Shall At All Reasonable Times During Construction Of The Work Be Entitled To Examine, Inspect, Measure And Test The Materials And Workmanship, And To Check The Progress Of The Construction. 34.2. If The Procuring Entity’s Representative Instructs The Contractor To Carry Out A Test Not Specified In The Specification To Check Whether Any Work Has A Defect And The Test Shows That It Does, The Contractor Shall Pay For The Test And Any Samples. If There Is No Defect, The Test Shall Be A Compensation Event. 34.3. The Contractor Shall Permit The Funding Source Named In The Scc To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Appointed By The Funding Source, If So Required By The Funding Source. 35. Identifying Defects The Procuring Entity’s Representative Shall Check The Contractor’s Work And Notify The Contractor Of Any Defects That Are Found. Such Checking Shall Not Affect The Contractor’s Responsibilities. The Procuring Entity’s Representative May Instruct The Contractor To Search Uncover Defects And Test Any Work That The Procuring Entity’s Representative Considers Below Standards And Defective. 36. Cost Of Repairs Loss Or Damage To The Works Or Materials To Be Incorporated In The Works Between The Start Date And The End Of The Defects Liability Periods Shall Be Remedied By The Contractor At The Contractor’s Cost If The Loss Or Damage Arises From The Contractor’s Acts Or Omissions. 37. Correction Of Defects 37.1. The Procuring Entity’s Representative Shall Give Notice To The Contractor Of Any Defects Before The End Of The Defects Liability Period, Which Isone (1) Year From Project Completion Up To Final Acceptance By The Procuring Entity’s. 37.2. Every Time Notice Of A Defect Is Given, The Contractor Shall Correct The Notified Defect Within The Length Of Time Specified In The Procuring Entity’s Representative’s Notice. 37.3. The Contractor Shall Correct The Defects Which He Notices Himself Before The End Of The Defects Liability Period. 37.4. The Procuring Entity Shall Certify That All Defects Have Been Corrected. If The Procuring Entity Considers That Correction Of A Defect Is Not Essential, He Can Request The Contractor To Submit A Quotation For The Corresponding Reduction In The Contract Price. If The Procuring Entity Accepts The Quotation, The Corresponding Change In The Scc Is A Variation. 38. Uncorrected Defects 38.1. The Procuring Entity Shall Give The Contractor At Least Fourteen (14) Days Notice Of His Intention To Use A Third Party To Correct A Defect. If The Contractor Does Not Correct The Defect Himself Within The Period, The Procuring Entity May Have The Defect Corrected By The Third Party. The Cost Of The Correction Will Be Deducted From The Contract Price. 38.2. The Use Of A Third Party To Correct Defects That Are Uncorrected By The Contractor Will In No Way Relieve The Contractor Of Its Liabilities And Warranties Under The Contract. 39. Advance Payment 39.1. The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum Or, At The Most Two, Installments According To A Schedule Specified In The Scc. 39.2. The Advance Payment Shall Be Made Only Upon The Submission To And Acceptance By The Procuring Entity Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, A Bank Guarantee Or A Surety Bond Callable Upon Demand, Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission And Confirmed By The Procuring Entity. 39.3. The Advance Payment Shall Be Repaid By The Contractor By An Amount Equal To The Percentage Of The Total Contract Price Used For The Advance Payment. 39.4. The Contractor May Reduce His Standby Letter Of Credit Or Guarantee Instrument By The Amounts Refunded By The Monthly Certificates In The Advance Payment. 39.5. The Procuring Entity Will Provide An Advance Payment On The Contract Price As Stipulated In The Conditions Of Contract, Subject To The Maximum Amount Stated In Scc Clause 39.1. 40. Progress Payments 40.1. The Contractor May Submit A Request For Payment For Work Accomplished. Such Request For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 40.2. The Procuring Entity Shall Deduct The Following From The Certified Gross Amounts To Be Paid To The Contractor As Progress Payment: (a) Cumulative Value Of The Work Previously Certified And Paid For. (b) Portion Of The Advance Payment To Be Recouped For The Month. (c) Retention Money In Accordance With The Condition Of Contract. (d) Amount To Cover Third Party Liabilities. (e) Amount To Cover Uncorrected Discovered Defects In The Works. 40.3. Payments Shall Be Adjusted By Deducting There From The Amounts For Advance Payments And Retention. The Procuring Entity Shall Pay The Contractor The Amounts Certified By The Procuring Entity’s Representative Within Twenty Eight (28) Days From The Date Each Certificate Was Issued. No Payment Of Interest For Delayed Payments And Adjustments Shall Be Made By The Procuring Entity. 40.4. The First Progress Payment May Be Paid By The Procuring Entity To The Contractor Provided That At Least Twenty Percent (20%) Of The Work Has Been Accomplished As Certified By The Procuring Entity’s Representative. 40.5. Items Of The Works For Which A Price Of “0” (zero) Has Been Entered Will Not Be Paid For By The Procuring Entity And Shall Be Deemed Covered By Other Rates And Prices In The Contract. 41. Payment Certificates 41.1. The Contractor Shall Submit To The Procuring Entity’s Representative Monthly Statements Of The Estimated Value Of The Work Executed Less The Cumulative Amount Certified Previously. 41.2. The Procuring Entity’s Representative Shall Check The Contractor’s Monthly Statement And Certify The Amount To Be Paid To The Contractor. 41.3. The Value Of Work Executed Shall: (a) Be Determined By The Procuring Entity’s Representative; (b) Comprise The Value Of The Quantities Of The Items In The Bill Of Quantities Completed; And (c) Include The Valuations Of Approved Variations. 41.4. The Procuring Entity’s Representative May Exclude Any Item Certified In A Previous Certificate Or Reduce The Proportion Of Any Item Previously Certified In Any Certificate In The Light Of Later Information. 42. Retention 42.1. The Procuring Entity Shall Retain From Each Payment Due To The Contractor An Amount Equal To A Percentage Thereof Using The Rate As Specified In Itb Sub-clause 42.2. 42.2. Progress Payments Are Subject To Retention Of Ten Percent (10%), Referred To As The “retention Money.” Such Retention Shall Be Based On The Total Amount Due To The Contractor Prior To Any Deduction And Shall Be Retained From Every Progress Payment Until Fifty Percent (50%) Of The Value Of Works, As Determined By The Procuring Entity, Are Completed. If, After Fifty Percent (50%) Completion, The Work Is Satisfactorily Done And On Schedule, No Additional Retention Shall Be Made; Otherwise, The Ten Percent (10%) Retention Shall Again Be Imposed Using The Rate Specified Therefore. 42.3. The Total “retention Money” Shall Be Due For Release Upon Final Acceptance Of The Works. The Contractor May, However, Request The Substitution Of The Retention Money For Each Progress Billing With Irrevocable Standby Letters Of Credit From A Commercial Bank, Bank Guarantees Or Surety Bonds Callable On Demand, Of Amounts Equivalent To The Retention Money Substituted For And Acceptable To The Procuring Entity, Provided That The Project Is On Schedule And Is Satisfactorily Undertaken. Otherwise, The Ten (10%) Percent Retention Shall Be Made. Said Irrevocable Standby Letters Of Credit, Bank Guarantees And/or Surety Bonds, To Be Posted In Favor Of The Government Shall Be Valid For A Duration To Be Determined By The Concerned Implementing Office/agency Or Procuring Entity And Will Answer For The Purpose For Which The Ten (10%) Percent Retention Is Intended, I.e., To Cover Uncorrected Discovered Defects And Third Party Liabilities. 42.4. On Completion Of The Whole Works, The Contractor May Substitute Retention Money With An “on Demand” Bank Guarantee In A Form Acceptable To The Procuring Entity. 43. Variation Orders 43.1. Variation Orders May Be Issued By The Procuring Entity To Cover Any Increase/decrease In Quantities, Including The Introduction Of New Work Items That Are Not Included In The Original Contract Or Reclassification Of Work Items That Are Either Due To Change Of Plans, Design Or Alignment To Suit Actual Field Conditions Resulting In Disparity Between The Preconstruction Plans Used For Purposes Of Bidding And The “as Staked Plans” Or Construction Drawings Prepared After A Joint Survey By The Contractor And The Procuring Entity After Award Of The Contract, Provided That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. The Addition/deletion Of Works Should Be Within The General Scope Of The Project As Bid And Awarded. The Scope Of Works Shall Not Be Reduced So As To Accommodate A Positive Variation Order. A Variation Order May Either Be In The Form Of A Change Order Or Extra Work Order. 43.2. A Change Order May Be Issued By The Procuring Entity To Cover Any Increase/decrease In Quantities Of Original Work Items In The Contract. 43.3. An Extra Work Order May Be Issued By The Procuring Entity To Cover The Introduction Of New Work Necessary For The Completion, Improvement Or Protection Of The Project Which Were Not Included As Items Of Work In The Original Contract, Such As, Where There Are Subsurface Or Latent Physical Conditions At The Site Differing Materially From Those Indicated In The Contract, Or Where There Are Duly Unknown Physical Conditions At The Site Of An Unusual Nature Differing Materially From Those Ordinarily Encountered And Generally Recognized As Inherent In The Work Or Character Provided For In The Contract. 43.4. Any Cumulative Variation Order Beyond Ten Percent (10%) Shall Be Subject Of Another Contract To Be Bid Out If The Works Are Separable From The Original Contract. In Exceptional Cases Where It Is Urgently Necessary To Complete The Original Scope Of Work, The Head Of The Procuring Entity May Authorize A Positive Variation Order Go Beyond Ten Percent (10%) But Not More Than Twenty Percent (20%) Of The Original Contract Price, Subject To The Guidelines To Be Determined By The Gppb: Provided, However, That Appropriate Sanctions Shall Be Imposed On The Designer, Consultant Or Official Responsible For The Original Detailed Engineering Design Which Failed To Consider The Variation Order Beyond Ten Percent (10%). 43.5. In Claiming For Any Variation Order, The Contractor Shall, Within Seven (7) Calendar Days After Such Work Has Been Commenced Or After The Circumstances Leading To Such Condition(s) Leading To The Extra Cost, And Within Twenty-eight (28) Calendar Days Deliver A Written Communication Giving Full And Detailed Particulars Of Any Extra Cost In Order That It May Be Investigated At That Time. Failure To Provide Either Of Such Notices In The Time Stipulated Shall Constitute A Waiver By The Contractor For Any Claim. The Preparation And Submission Of Variation Orders Are As Follows: (a) If The Procuring Entity’s Representative/project Engineer Believes That A Change Order Or Extra Work Order Should Be Issued, He Shall Prepare The Proposed Order Accompanied With The Notices Submitted By The Contractor, The Plans Therefore, His Computations As To The Quantities Of The Additional Works Involved Per Item Indicating The Specific Stations Where Such Works Are Needed, The Date Of His Inspections And Investigations Thereon, And The Log Book Thereof, And A Detailed Estimate Of The Unit Cost Of Such Items Of Work, Together With His Justifications For The Need Of Such Change Order Or Extra Work Order, And Shall Submit The Same To The Head Of The Procuring Entity For Approval. (b) The Head Of The Procuring Entity Or His Duly Authorized Representative, Upon Receipt Of The Proposed Change Order Or Extra Work Order Shall Immediately Instruct The Technical Staff Of The Procuring Entity’s To Conduct An On-the-spot Investigation To Verify The Need For The Work To Be Prosecuted. A Report Of Such Verification Shall Be Submitted Directly To The Head Of The Procuring Entity Or His Duly Authorized Representative. (c) The, Head Of The Procuring Entity Or His Duly Authorized Representative, After Being Satisfied That Such Change Order Or Extra Work Order Is Justified And Necessary, Shall Review The Estimated Quantities And Prices And Forward The Proposal With The Supporting Documentation To The Head Of Procuring Entity For Consideration. (d) If, After Review Of The Plans, Quantities And Estimated Unit Cost Of The Items Of Work Involved, The Proper Office Of The Procuring Entity Empowered To Review And Evaluate Change Orders Or Extra Work Orders Recommends Approval Thereof, Head Of The Procuring Entity Or His Duly Authorized Representative, Believing The Change Order Or Extra Work Order To Be In Order, Shall Approve The Same. (e) The Timeframe For The Processing Of Variation Orders From The Preparation Up To The Approval By The Head Of The Procuring Entity Concerned Shall Not Exceed Thirty (30) Calendar Days. 44. Contract Completion Once The Project Reaches An Accomplishment Of Ninety Five (95%) Of The Total Contract Amount, The Procuring Entity May Create An Inspectorate Team To Make Preliminary Inspection And Submit A Punch-list To The Contractor In Preparation For The Final Turnover Of The Project. Said Punch-list Will Contain, Among Others, The Remaining Works, Work Deficiencies For Necessary Corrections, And The Specific Duration/time To Fully Complete The Project Considering The Approved Remaining Contract Time. This, However, Shall Not Preclude The Claim Of The Procuring Entity For Liquidated Damages. 45. Suspension Of Work 45.1. The Procuring Entity Shall Have The Authority To Suspend The Work Wholly Or Partly By Written Order For Such Period As May Be Deemed Necessary, Due To Force Majeure Or Any Fortuitous Events Or For Failure On The Part Of The Contractor To Correct Bad Conditions Which Are Unsafe For Workers Or For The General Public, To Carry Out Valid Orders Given By The Procuring Entity Or To Perform Any Provisions Of The Contract, Or Due To Adjustment Of Plans To Suit Field Conditions As Found Necessary During Construction. The Contractor Shall Immediately Comply With Such Order To Suspend The Work Wholly Or Partly. 45.2. The Contractor Or Its Duly Authorized Representative Shall Have The Right To Suspend Work Operation On Any Or All Projects/activities Along The Critical Path Of Activities After Fifteen (15) Calendar Days From Date Of Receipt Of Written Notice From The Contractor To The District Engineer/regional Director/consultant Or Equivalent Official, As The Case May Be, Due To The Following: (a) There Exist Right-of-way Problems Which Prohibit The Contractor From Performing Work In Accordance With The Approved Construction Schedule. (b) Requisite Construction Plans Which Must Be Owner-furnished Are Not Issued To The Contractor Precluding Any Work Called For By Such Plans. (c) Peace And Order Conditions Make It Extremely Dangerous, If Not Possible, To Work. However, This Condition Must Be Certified In Writing By The Philippine National Police (pnp) Station Which Has Responsibility Over The Affected Area And Confirmed By The Department Of Interior And Local Government (dilg) Regional Director. (d) There Is Failure On The Part Of The Procuring Entity To Deliver Government-furnished Materials And Equipment As Stipulated In The Contract. (e) Delay In The Payment Of Contractor’s Claim For Progress Billing Beyond Forty-five (45) Calendar Days From The Time The Contractor’s Claim Has Been Certified To By The Procuring Entity’s Authorized Representative That The Documents Are Complete Unless There Are Justifiable Reasons Thereof Which Shall Be Communicated In Writing To The Contractor. 45.3. In Case Of Total Suspension, Or Suspension Of Activities Along The Critical Path, Which Is Not Due To Any Fault Of The Contractor, The Elapsed Time Between The Effective Order Of Suspending Operation And The Order To Resume Work Shall Be Allowed The Contractor By Adjusting The Contract Time Accordingly. 46. Payment On Termination 46.1. If The Contract Is Terminated Because Of A Fundamental Breach Of Contract By The Contractor, The Procuring Entity’s Representative Shall Issue A Certificate For The Value Of The Work Done And Materials Ordered Less Advance Payments Received Up To The Date Of The Issue Of The Certificate And Less The Percentage To Apply To The Value Of The Work Not Completed, As Indicated In The Scc. Additional Liquidated Damages Shall Not Apply. If The Total Amount Due To The Procuring Entity Exceeds Any Payment Due To The Contractor, The Difference Shall Be A Debt Payable To The Procuring Entity. 46.2. If The Contract Is Terminated For The Procuring Entity’s Convenience Or Because Of A Fundamental Breach Of Contract By The Procuring Entity, The Procuring Entity’s Representative Shall Issue A Certificate For The Value Of The Work Done, Materials Ordered, The Reasonable Cost Of Removal Of Equipment, Repatriation Of The Contractor’s Personnel Employed Solely On The Works, And The Contractor’s Costs Of Protecting And Securing The Works, And Less Advance Payments Received Up To The Date Of The Certificate. 46.3. The Net Balance Due Shall Be Paid Or Repaid Within Twenty Eight (28) Days From The Notice Of Termination. 46.4. If The Contractor Has Terminated The Contract Under Gcc Clauses 17 Or 18, The Procuring Entity Shall Promptly Return The Performance Security To The Contractor. 47. Extension Of Contract Time 47.1. Should The Amount Of Additional Work Of Any Kind Or Other Special Circumstances Of Any Kind Whatsoever Occur Such As To Fairly Entitle The Contractor To An Extension Of Contract Time, The Procuring Entity Shall Determine The Amount Of Such Extension; Provided That The Procuring Entity Is Not Bound To Take Into Account Any Claim For An Extension Of Time Unless The Contractor Has, Prior To The Expiration Of The Contract Time And Within Thirty (30) Calendar Days After Such Work Has Been Commenced Or After The Circumstances Leading To Such Claim Have Arisen, Delivered To The Procuring Entity Notices In Order That It Could Have Investigated Them At That Time. Failure To Provide Such Notice Shall Constitute A Waiver By The Contractor Of Any Claim. Upon Receipt Of Full And Detailed Particulars, The Procuring Entity Shall Examine The Facts And Extent Of The Delay And Shall Extend The Contract Time Completing The Contract Work When, In The Procuring Entity’s Opinion, The Findings Of Facts Justify An Extension. 47.2. No Extension Of Contract Time Shall Be Granted The Contractor Due To (a) Ordinary Unfavorable Weather Conditions And (b) Inexcusable Failure Or Negligence Of Contractor To Provide The Required Equipment, Supplies Or Materials. 47.3. Extension Of Contract Time May Be Granted Only When The Affected Activities Fall Within The Critical Path Of The Pert/cpm Network. 47.4. No Extension Of Contract Time Shall Be Granted When The Reason Given To Support The Request For Extension Was Already Considered In The Determination Of The Original Contract Time During The Conduct Of Detailed Engineering And In The Preparation Of The Contract Documents As Agreed Upon By The Parties Before Contract Perfection. 47.5. Extension Of Contract Time Shall Be Granted For Rainy/unworkable Days Considered Unfavorable For The Prosecution Of The Works At The Site, Based On The Actual Conditions Obtained At The Site, In Excess Of The Number Of Rainy/unworkable Days Pre-determined By The Procuring Entity In Relation To The Original Contract Time During The Conduct Of Detailed Engineering And In The Preparation Of The Contract Documents As Agreed Upon By The Parties Before Contract Perfection, And/or For Equivalent Period Of Delay Due To Major Calamities Such As Exceptionally Destructive Typhoons, Floods And Earthquakes, And Epidemics, And For Causes Such As Non-delivery On Time Of Materials, Working Drawings, Or Written Information To Be Furnished By The Procuring Entity, Non-acquisition Of Permit To Enter Private Properties Within The Right-of-way Resulting In Complete Paralyzation Of Construction Activities, And Other Meritorious Causes As Determined By The Procuring Entity’s Representative And Approved By The Head Of The Procuring Entity. Shortage Of Construction Materials, General Labor Strikes, And Peace And Order Problems That Disrupt Construction Operations Through No Fault Of The Contractor May Be Considered As Additional Grounds For Extension Of Contract Time Provided They Are Publicly Felt And Certified By Appropriate Government Agencies Such As Dti, Dole, Dilg, And Dnd, Among Others. The Written Consent Of Bondsmen Must Be Attached To Any Request Of The Contractor For Extension Of Contract Time And Submitted To The Procuring Entity For Consideration And The Validity Of The Performance Security Shall Be Correspondingly Extended. 48. Price Adjustment Except For Extraordinary Circumstances As Determined By Neda And Approved By The Gppb, No Price Adjustment Shall Be Allowed. Nevertheless, In Cases Where The Cost Of The Awarded Contract Is Affected By Any Applicable New Laws, Ordinances, Regulations, Or Other Acts Of The Gop, Promulgated After The Date Of Bid Opening, A Contract Price Adjustment Shall Be Made Or Appropriate Relief Shall Be Applied On A No Loss-no Gain Basis. 49. Completion The Contractor Shall Request The Procuring Entity’s Representative To Issue A Certificate Of Completion Of The Works, And The Procuring Entity’s Representative Will Do So Upon Deciding That The Work Is Completed. 50. Taking Over The Procuring Entity Shall Take Over The Site And The Works Within Seven (7) Days From The Date The Procuring Entity’s Representative Issues A Certificate Of Completion. 51. Operating And Maintenance Manuals 51.1. If “as Built” Drawings And/or Operating And Maintenance Manuals Are Required, The Contractor Shall Supply Them By The Dates Stated In The Scc. 51.2. If The Contractor Does Not Supply The Drawings And/or Manuals By The Dates Stated In The Scc, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative Shall Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Gcc Clause 1.16 The Intended Completion Date Is 120 Cd From Ntp. 1.21 The Procuring Entity Is Lgu- Mapanas, Northern Samar. 1.22 The Procuring Entity’s Representative Is Atty. Ronn Michael L. Tejano Municipal Mayor Municipality Of Mapanas Province Of Northern Samar 1.23 The Site Is Located At Mapanas, Northern Samar. 1.27 The Start Date Is: Upon Receipt Of Notice To Proceed. 1.30 The Works Consist Of: Item No. Scope Of Work Quantity Unit Improvement Of Jubasan Barangay Road, Brgy. Jubasan, Mapanas Northern Samar B.5 Project Billboard/sign Board 1.00 Each B.7(2) Occupational Safety And Health Program 1.00 Is B.9 Mobilization/demobilization 1.00 Is Part C Earthworks 102(2)b Surplus Common Excavation 261.00 Cu.m. 104(1)a Embankment From Roadway Excavation (common Soil) 248.00 Cu.m. 104(2)a Embankment From Borrow (common Soil) 0.00 Cu.m. 105(1) Subgrade Preparation (common Material) 1131.00 Sq.m. Part D Subbase And Base Course 200(1) Aggregate Subbase Course 117.45 Cu.m. 201(1) Aggregate Base Course 226.20 Cu.m. Part E Surface Courses 311(1)a2 Pcc Pavement (plain) Conventional Method, 200mm Thk. 435.00 Sq.m. 2.2 Note: The Items To Follow 5.1 The Procuring Entity Shall Give Possession Of All Parts Of The Site To The Contractor Upon The Issuance Of Notice To Proceed. 6.5 The Contractor Shall Employ The Following Key Personnel: Key Personnel Number Civil Engineer 1 Construction Foreman 1 Labor Workers 3 7.4(c) “no Further Instructions”. 7.7 No Further Instructions. 8.1 No Further Instructions. 10 The Site Investigation Reports Are: None 12.3 No Further Instructions. 12.5 In Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures: Five (5) Years. 13 “no Additional Provision.” 18.3(h)(i) No Further Instructions. 21.2 The Arbiter Is: Construction Industry Arbitration Commission 29.1 No Day Works Are Applicable To The Contract. 31.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within 15days Of Delivery Of The Letter Of Acceptance. 31.3 The Period Between Program Of Work Updates Is 15days. The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is P 1,000.00. 34.3 The Funding Source Is Coming From Nia 39.1 The Amount Of The Advance Payment Is 15% Of The Contract Price (lump Sum) And Shall Be Release Once Upon Presentation Of The Following Documents As Required: 1. Letter Request For Advance Payment From The Contractor 2. Bank Guarantee For Advance Payment 40.1 Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Be Included For Payment. 51.1 The Date By Which Operating And Maintenance Manuals Are Required Is Not Applicable. The Date By Which “as Built” Drawings Are Required Is 20 Days Upon Completion Of The Subproject. 51.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is P1,000.00. Section Vi. Specifications Project Name: Improvement Of Jubasan Barangay Road Location : Brgy. Jubasan, Mapanas, Northern Samar Item No. Description Qty. Unit. B.5 Project Billboard/signboard 1.00 Lot Labor A. Construction Foreman 4.00 1 B. Skilled Laborer 4.00 1 C. Unskilled Laborer 4.00 2 A. 2 Material A. Tarpaulin (8’x8’) 1.00 Pc B. Coco Lumber 84.00 Bd.ft. C. Plywood Marine (0.0125mx1.2mx2.44m) 2.00 Pc D. Common Nails Assorted 0.50 Kg B.7(2) Occupational Safety And Health Program A. Safety Practitioner (part Time) 8.00 1 B. B. Health Personnel (full Time) 30.00 1 C. Equipment D. A. Safety Shoes 22.00 Man-day E. B. Safety Helmet 22.00 Man-day F. C. Safety/working Gloves 22.00 Man-day G. D. Safety/working Gloves 22.00 Man-day H. E. Rubber Boots 22.00 Man-day F. Rain Coats (30% Of The Duration) Optional 7.00 Man-day Equipment A.dumptruck (12 Cu. Yd.) 16.00 2 B.payloader (1.5 Cu.m.).lx80-2c 16.00 1 C. Bulldozer, D6h Series Ii Psds/do 16.00 1 E. Backhoe W/ Breaker (0.80 Cu.m.) 16.00 1 102(2)b Surplus Common Excavation 1.00 Lot A. 1 A. Construction Foreman A. Construction Foreman 1.00 1 B. Unskilled Laborer 1.00 2 Name And Capacity Equipment A. Bulldozer, D6h Series Ii Psds/ 1.00 1 B. Payloader (1.5 Cu.m.) 1.00 1 C. Payloader (1.5 Cu.m.) 0.30 1 C. Dump Truck (12 Cu. Yd.) 1.00 3 D. Backhoe (0.80 Cu.m.) 1.00 1 104(1)a Embankment From Roadway Excavation (common Soil) A. Construction Foreman 0.83 1 B. Unskilled Laborer 0.83 2 Spreading And Compaction A. Construction Foreman 1.00 1 B. Unskilled Laborer 1.00 2 Equipment A. Bulldozer, D6h Series Ii Psds/dd 0.83 1 B. Payloader (1.50 Cu.m.), Lx80-2c 0.83 1 C. Dump Truck (12 Cu.yd.) 0.83 2 Spreading And Compaction A. Motorized Road Grader 1.00 1 B.vibratory Roller (10 M.t.) Sd100dc 1.00 1 C.water Truck/pump (1600 L.) 0.25 1 A.1 Labor A.construction Foreman 1.00 1 B.unskilled Laborer 1.00 2 Equipment A.motorized Road Grader, G710a 1.00 1 B.vibratory Roller (10 Ml.) Sd100dc 1.00 1 C.water Truck/pump (16000l) 0.25 1 200(1) Aggregate Subbase Course Labor A. Construction Foreman 1.00 1 B. Unskilled 1.00 2 Equipment A. Motorized Road Grader, G710a 1.00 1 B. Vibratory Roller (10 M.t.), Sd 1.00 1 C.water Truck/pump (16000 L) 0.25 1 Materials A.aggregate Subbase Course 1.15 Cu.m. Labor A. Construction Foreman 1.00 1 B. Unskilled Laborer 1.00 2 Name And Capacity Equipment A.motorized Road Grader, G710a 1.00 1 B. Vibratory Roller (10 Mt.). Sd100dc 1.00 1 C.water Truck/pump (16000l) 0.25 1 311(1)a.2 Pcc Pavement (palin)-conventional Method, 200mm Thk. Labor A.construction Foreman 1.00 1 B.skilled Laborer 1.00 4 C.unskilled Laborer 1.00 12 Equipment A.transit Mixer (5-6 Cu.yd) 1.00 4 B.concrete Vibrator 1.00 2 C.concrete Batch (30 Cu.m.) 1.00 1 D.payloader (1.50 Cu.m)lx80-2c 1.00 1 E.concrete Screeder (5.5 Hp) 1.00 1 F.water Truck/pump (16000l) 1.00 1 G.concrete Saw, Blade 0/ 14” (7.5 Hp) 1.00 1 H.bar Cutter, Single Phase 1.00 1 I.joint Sealer Machine 0.25 1 Materials A.reinforcing Steel Bar, Grade 40 0.39 Kg. B.curing Compound 0.29 Lit C.asphalt Sealant 0.12 Lit. D.steel Forms (rental) 0.46 I.m. E.sand 0.1100 Cu.m F.gravel 0.20 Cu.m G.portland Cement Type 1 1.90 Bag H.concrete Saw (diamond Blade 14”) 0.00015 Pc I.pipe Sleeve, 2” Dia 0.0086 I.m. J. Greasse/tar 0.0056 Lit. Section Vii. Drawings Bill Of Quantities Item No. Scope Of Work Quantity Unit Unit Cost Total Amount 1.) Improvement Of Jubasan Barangay Road, Brgy. Jubasan, Mapanas, N. Samar B.5 Project Billboard/signboard 1.00 Lot 10,959.69 10,959.69 B.7 (2) Occupational Safety And Health Program 1.00 I.s. 25,498.91 25,498.91 B.9 Mobilization/demobilization 1.00 I.s. 15,431.03 15,431.03 Part C 102(2)b Surplus Common Excavation 261.00 Cu.m. 204.24 53,306.64 104(1)a Embankment From Roadway Excavation (common Soil) 248.00 Cu.m. 310.07 76,897.36 104(2)a Embankment From Borrow (common Soil) 0.00 Cu.m. 105(1) Subgrade Preparation (common Material) 1131.00 Sq.m. 21.14 23,909.34 Part D Subbase And Base Course 200(1) Aggregate Subbase Course 117.45 Cu.m. 1,632.38 191,723.03 201(1) Aggregate Base Course 226.20 Cu.m. 2,843.65 643,233.63 Part E 311(1)a2 Pcc Pavement (plain) Conventional Method, 200mm Thk 435.00 Sq.m. 2,160.51 939,821.85 Total 1,980,781.48 Total Cost Of All Line Item Includes Cost Of Contractor’s Profit, Taxes And Ocm. Attached Detailed Cost Estimates Section Ix. Bidding Forms Table Of Contents Bid Form 79 Form Of Contract Agreement 81 Omnibus Sworn Statement 83 Bid Form Date: Iaeb No: To: Lgu-mapanas Northern Samar Address: Mapanas Northern Samar We, The Undersigned, Declare That: We Have Examined And Have No Reservation To The Bidding Documents, Including Addenda, For The Contract Improvement Of Jubasan Barangay Road , Barangay Jubasan , Mapanas N. Samar (a) We Offer To Execute The Works For This Contract In Accordance With The Bid And Bid Data Sheet, General And Special Conditions Of Contract Accompanying This Bid; The Total Price Of Our Bid, Excluding Any Discounts Offered In Item (d) Below Is: [insert Information]; The Discounts Offered And The Methodology For Their Application Are: [insert Information]; (b) Our Bid Shall Be Valid For A Period Of 120 Days From The Date Fixed For The Bid Submission Deadline In Accordance With The Bidding Documents, And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period; (c) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract; (d) Our Firm, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Have Nationalities From The Following Eligible Countries: [insert Information]; (e) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (f) Our Firm, Its Affiliates Or Subsidiaries, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Has Not Been Declared Ineligible By The Funding Source; (g) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (h) We Understand That You Are Not Bound To Accept The Lowest Evaluated Bid Or Any Other Bid That You May Receive. Name: In The Capacity Of: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Form Of Contract Agreement This Agreement, Made This [insert Date] Day Of [insert Month], [insert Year] Between [name And Address Of Procuring Entity](hereinafter Called The “entity”) And [name And Address Of Contractor] (hereinafter Called The “contractor”). Whereas, The Entity Is Desirous That The Contractor Execute [name And Identification Number Of Contract] (hereinafter Called “the Works”) And The Entity Has Accepted The Bid For [insert The Amount In Specified Currency In Numbers And Words] By The Contractor For The Execution And Completion Of Such Works And The Remedying Of Any Defects Therein. Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents Shall Be Attached, Deemed To Form, And Be Read And Construed As Part Of This Agreement, To Wit: (a) General And Special Conditions Of Contract; (b) Drawings/plans; (c) Specifications; (d) Invitation To Apply For Eligibility And To Bid; (e) Instructions To Bidders; (f) Bid Data Sheet; (g) Addenda And/or Supplemental/bid Bulletins, If Any; (h) Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes; (i) Eligibility Requirements, Documents And/or Statements; (j) Performance Security; (k) Credit Line Issued By A Licensed Bank, If Any; (l) Notice Of Award Of Contract And The Bidder’s Conforme Thereto; (m) Other Contract Documents That May Be Required By Existing Laws And/or The Entity. 3. In Consideration Of The Payments To Be Made By The Entity To The Contractor As Hereinafter Mentioned, The Contractor Hereby Covenants With The Entity To Execute And Complete The Works And Remedy Any Defects Therein In Conformity With The Provisions Of This Contract In All Respects. 4. The Entity Hereby Covenants To Pay The Contractor In Consideration Of The Execution And Completion Of The Works And The Remedying Of Defects Wherein, The Contract Price Or Such Other Sum As May Become Payable Under The Provisions Of This Contract At The Times And In The Manner Prescribed By This Contract. In Witness Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Signed, Sealed, Delivered By The (for The Entity) Signed, Sealed, Delivered By The (for The Contractor). Binding Signature Of Procuring Entity ________________________________________________ Binding Signature Of Contractor _____________________________________________ [addendum Showing The Corrections, If Any, Made During The Bid Evaluation Should Be Attached With This Agreement] Omnibus Sworn Statement Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Represent It In The Bidding For [name Of The Project] Of The [name Of The Procuring Entity]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary And/or To Represent The [name Of Bidder] In The Bidding As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate Issued By The Corporation Or The Members Of The Joint Venture)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder]is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: I Am Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [jurat] * This Form Will Not Apply For Wb Funded Projects.
Closing Date16 Dec 2024
Tender AmountPHP 1.9 Million (USD 33.5 K)
Don Emilio Del Valle Memorial Hospital Tender
Healthcare and Medicine
Philippines
Details: Description Items For Bidding - Medical Surgical Supplies For Cy 2025 (epa) Description Quantity Unit Unit Cost Total Cost 1 Glutaraldehyde, Solvents, Tensides, Corrosion Inhibitor With 28 Days Lifespan Once Open 25 Gal 2,000.00 50,000.00 2 Propanol, Benzalkonium Chloride 60 Bot 2,600.00 156,000.00 3 Way Stopcock 1300 Pcs 15.00 19,500.00 3 Way Stopcock With Extension Tube 10cm-20 Cm, Sterile 500 Pcs 380.00 190,000.00 Abdominal Binder, Size L & Xl 300 Pcs 100.00 30,000.00 Absorbable Hemostat, 10cm² Contain 100mg Collagen Of Bovine Origin, 3 Cm X5 Cm 25 Pcs 560.00 14,000.00 Air Way Size #1 50 Pcs 40.00 2,000.00 Air Way Size #2 100 Pcs 40.00 4,000.00 Air Way Size #3 50 Pcs 40.00 2,000.00 Air Way Size 0 (60mm) 30 Pcs 40.00 1,200.00 Air Way Size 00 (50mm) 30 Pcs 40.00 1,200.00 Alcohol Swab 10000 Pcs 2.50 25,000.00 Alcohol, Isopropyl, 70%, 500ml 1000 Bot 95.00 95,000.00 Alcohol, Isoprophyl, 70%,3.75l 500 Gal 800.00 400,000.00 Arm Sling, Adult, Made In 100% Comfortable Cotton *double Ply* Detachable Buckle* Adjustable Strap 150 Pcs 250.00 37,500.00 Arm Sling, Upper Extension Sling, Pedia, Medium 100 Pcs 250.00 25,000.00 Autoclave Indicator, Size: 1" X 50 Meters 50 Roll 320.00 16,000.00 Autoclave Indicator, Size: 3/4" (18mm) X 10 Yards 25 Roll 800.00 20,000.00 Bag Valve Mask, Disposable Pedia, Self-inflating Bag, One-way Valve, Mask, And With Oxygen Reservoir. 50 Pcs 1,000.00 50,000.00 Bag Valve Mask, Disposable, Adult, Self-inflating Bag, One-way Valve, Mask, And With Oxygen Reservoir. 200 Pcs 1,000.00 200,000.00 Bag Valve Mask, Disposable, Neonate 5 Pcs 1,000.00 5,000.00 Bandage , Elastic 2"x5" 10 Pcs 25.00 250.00 Bandage , Elastic 3"x5" 200 Pcs 25.00 5,000.00 Bandage , Elastic 4"x5" 750 Pcs 25.00 18,750.00 Bandage , Elastic 6" X 5" 500 Pcs 35.00 17,500.00 Bedpan, Plastic, Adult 10 Pcs 100.00 1,000.00 Blood Lancet, Ultrafine, G.30, 100's 200 Box 280.00 56,000.00 Blood Transfusion Set 1000 Pcs 58.00 58,000.00 Bp Inflation Bag With Cuff, Children - Bp Cuff Size: 22-36 Cm/ 22-48cm 15 Set 400.00 6,000.00 Bp Inflation Bag With Cuff, Adult Standard 50 Set 400.00 20,000.00 Bp Rubber Pump 10 Pcs 240.00 2,400.00 Breathing Circuit, Anesthesia, Adult, 72'' Expanding Tubing, 3l Latex Bag, 1 Filter And Gas Sampling Elbow 100 Set 980.00 98,000.00 Breathing Circuit, Anesthesia, Pedia, 62'' Expanding Tubing, 1l Latex Bag, 1 Filter And Gas Sampling Elbow 50 Set 980.00 49,000.00 Breathing Circuit, Disposable, Neonate With Connector And Water Traps 10 Set 950.00 9,500.00 Brush, Surgical, Disposable 1000 Pcs 65.00 65,000.00 Cadaver Bag, Adult, With Zipper, 230cmx90cm 100 Pcs 500.00 50,000.00 Cautery Ground Pad, Adult 50 Pcs 300.00 15,000.00 Cautery Ground Pad, Neonate 10 Pcs 200.00 2,000.00 Cautery Ground Pad, Pedia 25 Pcs 250.00 6,250.00 Cautery Pen, Compatible With Valleylab 500 Pcs 400.00 200,000.00 Cervical Collar , Hard Case, Pedia, Adjustible Size 5 Pcs 300.00 1,500.00 Cervical Collar, Hard Case , Adult, Adjustible Size 20 Pcs 250.00 5,000.00 Chest Catheter Fr. 20,radiopaque 5 Pcs 750.00 3,750.00 Chest Catheter Fr. 22,radiopaque 5 Pcs 750.00 3,750.00 Chest Catheter Fr. 28,radiopaque 5 Pcs 750.00 3,750.00 Chest Catheter Fr. 32,radiopaque 10 Pcs 750.00 7,500.00 Chest Catheter Fr. 36,radiopaque 50 Pcs 750.00 37,500.00 Chest Tubing With 1.5l Bottle, Disposable, Set (compact Chest Drainage System) 150 Set 900.00 135,000.00 Closed Suction Tube F 14 (c0vid Use) 50 Pcs 1,600.00 80,000.00 Closed Suction Tube F 16 (covid Use) 5 Pcs 1,600.00 8,000.00 Colostomy Bag 40mm 50 Pcs 560.00 28,000.00 Colostomy Bag 60mm 100 Pcs 560.00 56,000.00 Cord Clamp, Disposable, Umbilical 30 Box 380.00 11,400.00 Cotton Applicator 6", Individually Packed , Sterile, 100's/box 100 Pack 185.00 18,500.00 Cotton Balls , 300 Pcs. / Pack 1000 Pack 95.00 95,000.00 Delivery Room Gloves, Non-powdered, Size 7.5, Elbow Length 300 Pairs 410.00 123,000.00 Delivery Room Gloves, Sterile, Non-powdered, Size 7, Elbow Length 300 Pairs 370.00 111,000.00 Disinfectant Spray, Antibacterial, 12 Oz. (340g) Ethanol 60% 300 Can 565.00 169,500.00 Disposable Laparotomy Pack For C/s, Sterile 50 Pack 2,000.00 100,000.00 Dressing Pack, Sterile With Expiry Date 2000 Pack 105.00 210,000.00 Ecg Electrodes , Adult 5000 Pcs 13.00 65,000.00 Ecg Electrodes , Neonate 200 Pcs 11.00 2,200.00 Ecg Electrodes , Pediatric 2000 Pcs 11.00 22,000.00 Ecg Paper 80 Mmx 20 Mm 300 Roll 245.00 73,500.00 Endotracheal Tube Holder , Adult 150 Pcs 250.00 37,500.00 Endotracheal Tube With Cuff Size 5.5 20 Pcs 50.00 1,000.00 Endotracheal Tube With Cuff Size 6.0 20 Pcs 50.00 1,000.00 Endotracheal Tube With Cuff Size 6.5 35 Pcs 55.00 1,925.00 Endotracheal Tube With Cuff Size 7.0 50 Pcs 55.00 2,750.00 Endotracheal Tube With Cuff Size 7.5 150 Pcs 55.00 8,250.00 Endotracheal Tube With Cuff Size 8.0 150 Pcs 55.00 8,250.00 Endotracheal Tube With Soft Cuff Size 5.0 20 Pcs 50.00 1,000.00 Endotracheal Tube Without Soft Cuff Size 2.0 50 Pcs 55.00 2,750.00 Endotracheal Tube Without Soft Cuff Size 2.5 50 Pcs 55.00 2,750.00 Endotracheal Tube Without Soft Cuff Size 3.0 50 Pcs 55.00 2,750.00 Endotracheal Tube Without Soft Cuff Size 3.5 50 Pcs 55.00 2,750.00 Endotracheal Tube Without Soft Cuff Size 4.0 20 Pcs 50.00 1,000.00 Endotracheal Tube Without Soft Cuff Size 4.5 20 Pcs 50.00 1,000.00 Epidural Set, Touhy Bevel, Diameter 1.30 X 80 Mm, (18 G), Ø 0.85 X Ø 0.45 X 1000 Mm (20g), With Filter 50 Set 2,000.00 100,000.00 Extension Tubing , With 3 Needle Free Connections 500 Pcs 380.00 190,000.00 Extension Tubing , With Needle Free Connections 500 Pcs 104.00 52,000.00 Face Mask, With Earloop, 50's/box 1000 Box 100.00 100,000.00 Fiber Optic Bulb For Laryngoscope 10 Pcs 3,200.00 32,000.00 Foley Bag Catheter, 2 Way, Fr.10 20 Pcs 40.00 800.00 Foley Bag Catheter, 2 Way, Fr.12 50 Pcs 40.00 2,000.00 Foley Bag Catheter, 2 Way, Fr.14 500 Pad 40.00 20,000.00 Foley Bag Catheter, 2 Way, Fr.16 1030 Pcs 50.00 51,500.00 Foley Bag Catheter, 2 Way, Fr.18 250 Pcs 40.00 10,000.00 Foley Bag Catheter, 2 Way, Fr.22 100 Pcs 40.00 4,000.00 Foley Bag Catheter, 2 Way, Fr.24 100 Pcs 40.00 4,000.00 Foley Bag Catheter, 2 Way, Fr.5 25 Pcs 40.00 1,000.00 Foley Bag Catheter, 2 Way, Fr.8 25 Pcs 40.00 1,000.00 Foley Bag Catheter, 3 Way, Fr.16 50 100.00 5,000.00 Foley Bag Catheter, 3 Way, Fr.22 50 Pcs 100.00 5,000.00 Foley Bag Catheter, 3 Way, Fr.24 100 Pcs 100.00 10,000.00 Foley Bag Catheter, 3-way, Fr. 18 50 Bot 100.00 5,000.00 Gauze, Absorbent, 36x100yrds 24 X 28mesh 350 Roll 1,300.00 455,000.00 Gel Ultrasound 10 Gal 800.00 8,000.00 Gloves, Orthopedic, Sterile, Size 7 , Powder Free 50 Pairs 50.00 2,500.00 Gloves, Non-sterile, Nitrile, Large 20000 Pairs 9.00 180,000.00 Gloves, Non-sterile, Nitrile, Medium 30500 Pairs 9.00 274,500.00 Gloves, Non-sterile, Nitrile, Small 30000 Pairs 9.00 270,000.00 Gloves, Orthopedic, Sterile, Size 7 1/2, Powder Free 200 Pairs 50.00 10,000.00 Gloves, Sterile #6 , Powder Free Latex 5000 Pairs 22.00 110,000.00 Gloves, Sterile #6.5,powder Free, Latex 14500 Pairs 22.00 319,000.00 Gloves, Sterile #7 1/2, Powder Free , Latex 13500 Pairs 22.00 297,000.00 Gloves, Sterile #7, Powder Free, Latex 10000 Pairs 22.00 220,000.00 Gloves, Sterile #8, Powder Free, Latex 500 Pairs 22.00 11,000.00 Gluco Strip, Plus Test Strips With Free Lancet, Pricking Pen And Glucometer In Every 50 Packs, 50 Strip/pack 1000 Pack 1,100.00 1,100,000.00 Heat- Sealing Sterilization Pouch W/ Indicator 100mmx100m 10 Roll 1,200.00 12,000.00 Heat- Sealing Sterilization Pouch W/ Indicator 150mmx100m 5 Roll 1,700.00 8,500.00 Heat- Sealing Sterilization Pouch W/ Indicator 8"x100's, Sps 3 Roll 2,500.00 7,500.00 Hot Water Bag-rubber Medium 100 Pcs 100.00 10,000.00 Hydrogen Peroxide, 10 Vol, 120 Cc/bot. 500 Bot 50.00 25,000.00 I.v. Macroset With Airvent, 3-way Port, Needleless 5000 Pcs 100.00 500,000.00 I.v. Microset With Airvent, 3-way Port, Needleless 1500 Pcs 115.00 172,500.00 Ice Bag 6" 50 Pcs 80.00 4,000.00 Infusomat Space Line (macroset), Type Iv-injection-neutrapur, Luer Lock, Good Quality 250 Pcs 795.00 198,750.00 Injection Pad, 36mm Defries B100 500 Pcs 30.00 15,000.00 "intravenous Cannula G18, With Safetouch Wing Cath Without Injection Port 18gx1-1/4"" (32mm) " 5000 Pcs 100.00 500,000.00 "intravenous Cannula G20, With Safetouch Wing Cath Without Injection Port 20gx1-1/4"" (32mm) " 10000 Pcs 100.00 1,000,000.00 "intravenous Cannula G22, With Safetouch Wing Cath Without Injection Port 22gx1"" (25mm) " 5000 Pcs 100.00 500,000.00 "intravenous Cannula G24, With Safetouch Wing Cath Without Injection Port 24gx3/4"" (19mm) " 10000 Pcs 100.00 1,000,000.00 "intravenous Cannula G26, With Safetouch Wing Cath Without Injection Port 26gx3/4"" (19mm) " 3000 Pcs 100.00 300,000.00 Intubating Stylet Fr 10, 3.3mm Guide Wire) 100 Pcs 150.00 15,000.00 Intubating Stylet Fr 12, ( Guide Wire) 50 Pcs 150.00 7,500.00 Intubating Stylet Fr 14 ,4.6mm (guide Wire) 200 Pcs 150.00 30,000.00 Intubating Stylet Fr 6, 2.0mm (guide Wire) 50 Pcs 188.00 9,400.00 Iv Splint -neonate 350 Pcs 50.00 17,500.00 Iv Splint -pedia 500 Pcs 50.00 25,000.00 Iv Splint-adult 500 Pcs 70.00 35,000.00 Iv Start Pack 1500 Pcs 90.00 135,000.00 Iv Transparent Dressing, With Delivery Frame System, Breathable, Hypoallergenic, Waterproof, Impermeable To Bacteria And Viruses, Best For Neonates, 6x7cm, 100 Pcs Per Box 300 Pcs 40.00 12,000.00 Iv Transparent Dressing, With Delivery Frame System, Breathable, Hypoallergenic, Waterproof, Impermeable To Bacteria And Viruses, With Sterile Soft Cloth Tape Strips, Latex Free Best For Pediatric, 5cm X 5.7cm, 100 Pcs Per Box 150 Pcs 55.00 8,250.00 Jackson Pratt (suction Reservoir Cup), 100ml 100 Pcs 1,000.00 100,000.00 Kn95, Medical Grade, 5 Layers 1500 Pcs 8.00 12,000.00 Lubricating Gel, 150gm 80 Tube 150.00 12,000.00 Mesh, Premiline 5 Pcs 2,470.00 12,350.00 Mini Spike, Dispensing Pin 50 Pcs 150.00 7,500.00 Mortar And Pestle, Ceramic 5 Pcs 300.00 1,500.00 Mucus Extractor 150 Pcs 100.00 15,000.00 N95 Mask 10000 Pcs 90.00 900,000.00 Nebulizer Tubing Kit 3000 Pcs 50.00 150,000.00 Needle, Disposable Im G.18 10000 Pcs 2.50 25,000.00 Needle, Disposable Im G.23 500 Pcs 2.50 1,250.00 Needle, Disposable Im G.26 1000 Pcs 2.50 2,500.00 Needle, Pen For Insulin Pen 250 Pcs 18.00 4,500.00 Needleless Heplock, Polyprolene Body, Safetouch Plug 5000 Pcs 92.00 460,000.00 Oxygen Cannula Pedia 500 Pcs 30.00 15,000.00 Oxygen Cannula, Adult 1500 Pcs 30.00 45,000.00 Oxygen Cannula, Neonate 300 Pcs 30.00 9,000.00 Oxygen Mask, Adult W/ Tubing Disposable 500 Pcs 45.00 22,500.00 Oxygen Mask, Adult, Non-rebreather 300 Pcs 85.00 25,500.00 Paper Sterilizer 90x90 Cm 2000 Roll 25.00 50,000.00 Patient's Kit 1000 Set 350.00 350,000.00 Penrose Drain, Cigarette ,sterile, Size 1/2" 50 Pcs 30.00 1,500.00 Penrose Drain, Cigarette ,sterile, Size 1/4" 30 30.00 900.00 Plaster Of Paris ,4 Inches 50 Pcs 90.00 4,500.00 Plaster Of Paris ,6 Inches 50 Pcs 90.00 4,500.00 Plaster, Adhesive, Universal Surgical Tape, Assorted Size 500 Tube 3,500.00 1,750,000.00 Plaster, Paper Tape, Hypoallergenic, Non-latex, Non-woven With Strong Adhesion, 1/2 Inch Width And 10 Yards In Length, 24pcs Per Box 2000 Roll 55.00 110,000.00 Povidone Iodine, Cleanser 7.5%, 3.785 Ltrs 100 Gal 1,350.00 135,000.00 Povidone, Iodine Antiseptic Solution 10%. 3.785 Ltrs/gal 100 Gal 1,350.00 135,000.00 Razor, Disposable 1500 Pcs 20.00 30,000.00 Reinforce Skin Closures, 1/4" X 4', 6mmx100mm, Sterile 50 Pcs 130.00 6,500.00 Shoe Cover 1000 Pcs 2.50 2,500.00 Sodasorb 3 Pail 15,000.00 45,000.00 Solution Administration Set, Soluset, 150cc, Sterile 250 Pcs 150.00 37,500.00 Spinal Needle # 25 500 Pcs 93.00 46,500.00 Spinal Needle # 26 50 Pcs 93.00 4,650.00 Suction Catheter Fr.10 100 Pcs 18.00 1,800.00 Suction Catheter Fr.12 100 Pcs 18.00 1,800.00 Suction Catheter Fr.14 1000 Pcs 18.00 18,000.00 Suction Catheter Fr.16 1000 Pcs 18.00 18,000.00 Suction Catheter Fr.18 1000 Pcs 18.00 18,000.00 Suction Catheter Fr.5 300 Pcs 18.00 5,400.00 Suction Catheter Fr.8 3000 Pcs 18.00 54,000.00 Suction Set Pool Drain 1000 Pcs 275.00 275,000.00 Surgical Blade #10 1000 Pcs 5.00 5,000.00 Surgical Blade #11 500 Pcs 5.00 2,500.00 Surgical Blade #15 100 Pcs 5.00 500.00 Surgical Blade #20 500 Pcs 5.00 2,500.00 Surgical Cap, 100 Pcs/pack (bouffant) 10000 Pcs 1.20 12,000.00 Surgical Stapler/ Skin Stapler (for Every 10 Staplers Plus 1 Remover) 20 Pcs 500.00 10,000.00 Suture, Chromic 2- 0, With Round Needle 480 Pcs 120.00 57,600.00 Suture, Chromic Catgut 0, With Round Needle 150 Pcs 120.00 18,000.00 Suture, Chromic 3-0 , 75 Cm, Needle Size 26mm, With Round Bodied Needle 250 Pcs 110.00 27,500.00 Suture, Chromic 4-0 With Round Bodied 50 Pcs 110.00 5,500.00 Suture, Polyamide 3-0 , 45cm, Needle Size 26mm, With Cutting Needle 200 Pcs 200.00 40,000.00 Suture, Polyamide, 4-0 With Cutting Needle 100 Pcs 188.00 18,800.00 Suture, Polygactin 2-0, Round, 150 Pcs 340.00 51,000.00 Suture, Polygactin 6-0, 45cm, Needle Size11mm, With Reverse Cutting Needle 30 Pcs 518.00 15,540.00 Suture, Polygactin 6-0, 70cm, Needle Size 17mm, Round Needle 62 Pcs 518.00 32,116.00 Suture, Polygactin 910 Plus 0, 36", Needle Size 36mm, Round, 1000 Pcs 470.00 470,000.00 Suture, Polygactin 910 Plus 4-0,70cm, Needle Size 22mm, Atr Round Needle 200 Pcs 370.00 74,000.00 Suture, Polygactin 910, Plus 3.0 Atr, Round Needle (intestinal) 27", Needle Size 24mm 200 Pcs 410.00 82,000.00 Suture, Polyprolene 2-0,blue Monofilament, Round 32 300.00 9,600.00 Suture, Polyprolene 0,blue Monofilament, Round 12 370.00 4,440.00 Suture, Polyprolene 3-0, 75 Cm, Needle Size 17mm, Blue Monofilament, Round 270 Pcs 300.00 81,000.00 Suture, Polyprolene 3-0, Blue Monofilament, Cutting 30 Pcs 560.00 16,800.00 Suture, Polyprolene 4-0, 75 Cm, Round Needle, Size 17 Mm, Blue Monofilament 32 Pcs 1,150.00 36,800.00 Suture, Polyprolene 5-0, Cutting Needle 12 Pcs 560.00 6,720.00 Suture, Polyprolene 6-0, 60 Cm, Cutting Needle, Size 9.3 Mm, Blue Monofilament 12 Pcs 560.00 6,720.00 Suture, Polyprolene 6-0, 60 Cm, Round Needle, Size 9.3 Mm, Blue Monofilament 12 Pcs 560.00 6,720.00 Suture, Silk 0, Braided, 15x60m, Black, W/o Needle 60 Pcs 175.00 10,500.00 Suture, Silk 1-0, Round, 75cm, Needle Size 40mm, Round Bodied Needle 12 Set 125.00 1,500.00 Suture, Silk 2-0, Braided , 15x60cm, W/o Needle 200 Pcs 175.00 35,000.00 Suture, Silk 2-0, Round, 75cm, Needle Size 40mm, Round Bodied Needle 32 Pcs 125.00 4,000.00 Suture, Silk 3-0 , 75cm, Needle Size 26mm, W/ Round Needle 100 Pcs 110.00 11,000.00 Suture, Silk 4-0, 75cm, Needle Size 22mm, Cutting Needle 60 Pcs 110.00 6,600.00 Suture, Silk 4-0, 75cm, Needle Size 22mm, Round Needle 100 Pcs 110.00 11,000.00 Suture, Silk 4-0, W/ Out Needle 60 Pcs 115.00 6,900.00 Syringe, Asepto,60 Ml. 300 Pcs 45.00 13,500.00 Syringe, Disposable 20cc 5000 Pcs 20.00 100,000.00 Syringe, Disposable 50cc 3000 Pcs 20.00 60,000.00 Syringe, Disposable, 10cc 50000 Pcs 12.00 600,000.00 Syringe, Disposable, 1cc 3000 Pcs 10.00 30,000.00 Syringe, Disposable, 3cc 50000 Pcs 8.00 400,000.00 Syringe, Disposable, 5cc 3000 Pcs 9.00 27,000.00 Syringe, Insulin 20000 Pcs 10.00 200,000.00 Thermometer 3000 100.00 300,000.00 Tongue Depressor, Wooden, Individually Packed, Sterile 5000 Pcs 1.00 5,000.00 Tracheostomy Holder 50 Pcs 2,000.00 100,000.00 Tracheostomy Tube, With Inner Cannula, Size 6 5 Pcs 3,500.00 17,500.00 Tracheostomy Tube, With Inner Cannula, Size 7 5 Pcs 3,500.00 17,500.00 Tracheostomy Tube, With Inner Cannula, Size 7.5 5 Pcs 3,500.00 17,500.00 Tracheostomy Tube, With Inner Cannula, Size 8 5 Pcs 3,500.00 17,500.00 T-tube, Drainage, Silicone Fr. 14 20 Pcs 300.00 6,000.00 T-tube, Drainage, Silicone Fr. 16 50 Pcs 300.00 15,000.00 T-tube, Drainage, Silicone Fr. 18 50 Pcs 300.00 15,000.00 Tube, Ngt Fr. 10, Nasogastric 10 Pcs 15.00 150.00 Tube, Ngt Fr. 12, Nasogastric 30 Pcs 15.00 450.00 Tube, Ngt Fr. 14, Nasogastric 50 Pcs 15.00 750.00 Tube, Ngt Fr. 16, Nasogastric 300 Pcs 15.00 4,500.00 Tube, Ngt Fr. 18, Nasogastric 300 Pcs 15.00 4,500.00 Tube, Ngt Fr. 5, Nasogastric 300 Pcs 15.00 4,500.00 Tube, Ngt Fr. 8, Nasogastric 500 Pcs 15.00 7,500.00 Underpads (adult) 60x90 Cm, 80g 10000 Pcs 30.00 300,000.00 Urinal, Male, Plastic 200 Pcs 90.00 18,000.00 Urine Bag, 1000-2000 Ml Capacity 500 Pcs 35.00 17,500.00 Urine Collector 500 Pcs 5.00 2,500.00 Volumetric Set Space Line (compatible For Bbraun Machine) 100 Pcs 865.00 86,500.00 Wadding Sheet Size 4 X 5 150 Roll 40.00 6,000.00 Wadding Sheet Size 6 X 5 150 Roll 40.00 6,000.00 Wristlet Newborn Pink 1000 Pcs 3.00 3,000.00 Wristlet Newborn Blue 500 Pcs 3.00 1,500.00 Wristlet, Adult, Blue 2500 Pcs 4.00 10,000.00 Wristlet, Adult, Pink 1500 Pcs 4.00 6,000.00 Wristlet, Pedia, Blue 200 Pcs 3.00 600.00 Wristlet, Pedia, Pink 300 Pcs 3.00 900.00 Yankauer Suction Set, Connecting With Handle 25 Pcs 175.00 4,375.00
Closing Soon27 Nov 2024
Tender AmountPHP 20.4 Million (USD 345.3 K)
Department Of Education Division Of Albay Tender
Machinery and Tools
Philippines
Details: Description Invitation To Bid For Fy 2024 Procurement And Delivery Of Learning Tools And Equipment For Technical Vocational Livelihood (tvl) Project Identification No.: Pb-albaygoods-24-23 1. The Department Of Education, Schools Division Office Of Albay, Through The General Appropriations Act Of 2024 Intends To Apply The Sum Of Philippine Pesos Twenty Two Million Six Hundred Twenty Three Thousand Nine (php 22,623,009.00) Only Being The Abc As Payment For The Above-mentioned Contract. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Unit Of Measure Quantity Item Description Estimated Unit Cost (php) Estimated Cost (php) Fy 2024 Procurement And Delivery Of Learning Tools And Equipment For Technical Vocational Livelihood (tvl) 19 Pc Air Compressor With Airbrush Cake Decorating Set. Type L Single Cylinder Piston Compressor Body Shape : Cylindrical In Shape Material: Copper, Aluminum Dimension: (l X W X H) 24 Cm X 13 Cm X 17 Cm (minimum) Power Source: 220 Volts Ac, 60 Hz With Power Cord 1.5 Meters Long Minimum With Attachment Standard Male Plug Type A Or Provide An Adopter Plug Power Rating : 1/6 Hp Motor Capacity: Air Pressure Adjustment Range 0 To 57 Psi. Automatic On/off Shutoff Compressor Must Have Oil Filter, Water Trap Filter, Pressure Regulator With Gauge, And With Mounted Airbrush Holder And With Built In Cooling Fans Airbrush Specifications: A) Airbrush Material: Stainless Steel Body; B) Needle Dia.: 0.3 Mm. C) Cup Capacity: 2 Cc (cubic Centimeter); D) Airbrush With A 1/3 Oz. Gravity Fluid Cup; E) Nozzle That Allow To Spray From Hairline Up To 1 1/2 Inches Wide; F) Operating Pressure: 15-57 Psi. G) Rubber Hose Length: 2-meter (minimum) H.) Air Flow: 20 Liters/min. Package Content; 1 Pc Air Compressor, 1 Set Air Brush Kit With Case, 5 Ft- Rubber/vinyl Hose, 5 Pcs Cleaning Brushes In Different Width, Tools And User’s Manual. Comes With User's Manual That Content: Operation Guide, Maintenance/ Troubleshooting Procedure And List Of Parts. 10,000.02 190,000.38 114 Pc Beater. Body Shape: Circular Handheld Mixer Materials: Stainless Steel With Plastic Grip Dimension: L-28 Cm X Width-7 Cm (minimum) Twin Beater Designed For Mixing Preferably With Packing Case Smooth Motion Gear And Durable Mechanism Dishwasher Safe And Rust Free 475.00 54,150.00 114 Set Board, Chopping, 6 Color. Type: Food Grade Body Shape: Rectangular Material: Plastic (polypropylene), Food Grade Board Size: Length: 38 Cm (minimum) Width: 30 Cm (minimum) Thickness: 1.27 Cm (minimum) Color-coded For Use With Different Types Of Food, Blue, Red, Yellow, Green, Brown And White, 3,300.00 376,200.00 19 Pc Boiler, Double. Material: Stainless Steel Thickness: 1/16 Inch (1.5 Mm) (minimum) Lid Material: Glass Riveted Handle On Both Side Diameter: 9 1/2 Inches (minimum) Total Height: 9.4 Inches (minimum) Inset Bottom Diameter: 9 Inches (minimum) Inset Top Diameter: 9 Inches (minimum) Capacity: 2 Liters (minimum) Must Be A Set Which Includes One (1) Saucepan, One (1) Boiler, And One (1) Lid With Stainless Steel Handle And Smooth Surfaces With No Sharp Edges 2,465.00 46,835.00 228 Set Bowl, Mixing (6 Pcs/set). Type: Mixing Bowl Set Body Shape: Round Material: Stainless Steel, 0.8 Mm - 1.0 Mm Thick Each Set Must Consist Of The Following Capacities 1 Pc - 0.70 Liter 1 Pc - 1.5 Liters 1 Pc - 3 Liters 1pc - 4 Liters 1pc - 5 Liters 1pc - 8 Liters Light Weight And Easy To Use, Flat Base, Curved Lip Preferably With Packing Case. Dishwasher Safe. 2,440.00 556,320.00 114 Set Cake Pans, Round #4, #6, #8, #10, #12, #14, #16. Type: Round Pan Body Shape: Round Material: Anodized Aluminum Thickness: 1.29 Mm Thick (minimum) Depth: 2 Inches (50.8 Mm) (minimum) Set Must Each Contain The Following Diameter: 1 Pc - 6 Inches (152.4 Mm) Diameter (minimum) 1 Pc - 8 Inches (203.2 Mm) Diameter (minimum) 1 Pc - 10 Inches (254 Mm) Diameter (minimum) 1 Pc - 12 Inches (304.8 Mm)diameter (minimum) 1 Pc - 14 Inches (355.6 Mm) Diameter (minimum) 1 Pc - 16 Inches (406.4 Mm) Diameter (minimum) Preferably Packed (6 Pcs Per Set) Rolled Edge For Better Strength And Smooth Surface With No Sharp Edges The Materials Used Must Be Non-toxic. 3,650.00 416,100.00 114 Pc Cake Stand, With Tier. - Circular With 3 Tier. Hard Plastic, Polypropylene, 4 Mm Thick. The Tier Consists Of The Following Sizes: Tier 1: 18 Cm Diameter (minimum) Tier 2: 25 Cm Diameter (minimum) Tier 3 : 30 Cm Diameter (minimum) Column Diameter: 20 To 30 Mm (solid) Distance Between Tiers: 15 Cm Over-all Length: 30 Cm (minimum) 3,047.33 347,395.62 57 Pc Cake Turn Table. Material: Cast Aluminum Plate And Cast Iron Base Upper Plate: 30 Cm Diameter (minimum) And 1.4 Cm Thickness (minimum)base Dimensions: 18 Cm (minimum); 1.4 Cm Thickness (minimum) Total Height: 10 Cm To 15 Cm 2,500.00 142,500.00 247 Pc Coupler. Body Shape: Tubular Material: Hard Plastic, Polypropylene, Any Bright Color Height: 3cm (minimum) Top Diameter: 1.27 Cm (minimum) Bottom Diameter: 2.54 Cm (minimum) Preferably With Storage Case 265.00 65,455.00 228 Pc Cup, Measuring (for Solid). Type: Measuring Cup Set Body Shape: Round Material: Stainless Steel, 0.7 Mm Thick (minimum) Each Set Contains The Following: 1 Pc - 1 Cup (237 Ml) 1 Pc - 1/2 Cup (118 Ml) 1 Pc - 1/3 Cup (79 Ml) 1 Pc - 1/4 Cup (59 Ml) Handle Dimension: Length-12 Cm X Width-1 Cm (minimum) Measuring Capacity Engraved On The Handle Strip Handles Have Provision For Hanging Preferably With Packing Case Smooth Surfaces And Dishwasher Safe 575.00 131,100.00 228 Pc Cup, Measuring, 250 Ml For Liquid. Type: Clear Glass Cup Body Shape: Round Material: Clear, Non-porous Tempered Glass Capacity: 250 Ml (with 10 Ml Or 50 Ml Increments) With Permanent Graduation Markings Specified Metric And English System Of Measurement With Handle & Spout For Easy Pouring Preferably With Packing Case Food Grade And Safe Use To Microwave, Freezer And Dishwasher 885.00 201,780.00 228 Pc Cup, Measuring, 500ml For Liquid. Type: Clear Glass Cup Body Shape: Round Material: Clear, Non-porous Tempered Glass Capacity: 500 Ml (with 10 Ml Or 50 Ml Increments) With Permanent Graduation Markings Specified Metric And English System Of Measurement With Handle & Spout For Easy Pouring Preferably With Packing Case Food Grade And Safe Use To Microwave, Freeze And Dishwasher 1,150.00 262,200.00 19 Pc Cutter, Dough. Type: Scrapper Body Shape: Straight Blade Material: Stainless Steel Straight Blade With Stainless Steel Handle Blade Dimension: Length : 15 Cm X Width: 11 Cm X Thickness: 1.2 Mm(minimum) Handle Dimension: Length: 15 Cm X Diameter: 3 Cm (minimum) Preferably With Packing Case Food Grade And Dishwasher Safe Design Allows Item To Be Hung For Storage 620.00 11,780.00 114 Pc Cutter, Pie. Type: Pie Cutter Wheel Knife Body Shape: Round Wheel Roller Material: Stailess Steel Overall Length: 19.5 Cm (minimum) Wheel Diameter: 6.5 Cm (minimum) With Hanging Hook At The Tip Of The Handle For Hanging Storage High Quality Food Grade Stainless Steel, High Strength, Good Hardness Preferably With Packing Case Comes With Finger Protection And Not Easily Deformed, Anti-corrosion. Dishwasher Safe. 620.00 70,680.00 114 Pc Flour Sifter, Hand Cranked. Body Shape: Round Shape Material: Stainless Steel Dimension: Diameter: 133.3 Mm (minimum) X Height: 165 Mm (minimum) Thickness: 0.79 Mm (minimum) (body) And Constructed With Stainless Steel Wire Mesh # 30 Bottom Volume Markings Should Be Seen Inside And Outside Of The Sifter Capacity: 5 Cups (1.18 Liter) Spring Action Squeeze Handle Stainless Steel Preferably With A Packing Case. Dishwasher Safe. 500.00 57,000.00 114 Pc Grater. Type: Four-sided Box Grater Body Shape: Box In Shape Material: Stainless Steel Blade And Plastic (polypropylene Handle) Grater Dimensions: Height- 25 Cm X Width-13 Cm X Depth-10 Cm (minimum) Side 1: Large-hole Shredder With 6 Mm Hole Side 2: Slicer Side 3: Small-hole Shredder With 3 Mm Hole Side 4: Grater With Strips About 1.27 Cm To 2.54 Cm Length Preferably With Packing Case. Food Grade & Dishwashing Safe 350.00 39,900.00 114 Pc Knife, Kitchen. Blade Material: Stainless Steel 316. Must Be Branded. 500.00 57,000.00 114 Pc Knife, Pallet. Type: Pallete Knife Body Shape: Offset Blade Blade Material: Stainless Steel 316 Handle Material: Hardwood (smooth Finish) With Rivets Overall Length: 30.5 Cm - 35.6 Cm Total Length: Blade Dimension: Length- 17 Cm X Width-3.8 Cm (minimum) Thickness Of Blade: 1.7 Mm Thick (minimum) Preferably With Packing Case Dishwasher Safe. Must Be Branded. 450.00 51,300.00 114 Pc Ladle, 3 Oz. Material: Stainless Steel Thickness: 1 Mm Thick (minimum) Handle Length: 28 Cm (minimum) Capacity: 3 Oz. (85 Ml) Ladle Type: Round Bottom Hooked Handle Design Allows It To Easily Sit On The Edge Of Pots. Preferably With A Packing Case Dishwasher Safe. Must Be Branded. 300.00 34,200.00 114 Pc Loaf Pan, Big. Type: Loaf Pan Body Shape: Rectangular Material: Anodized Aluminum Thickness: 1.5 Mm - 2 Mm Length: 25.4 Cm (minimum) Width: 12.7 Cm (minimum) Depth: 7.62 Cm (minimum) Preferably With Packing Case Extended Sides For An Easy Grip And Smooth Surfaces With No Sharp Edges Food Grade And Oven Safe. Must Be Branded. 700.00 79,800.00 114 Pc Loaf Pan, Medium. Body Shape: Rectangular Material: Anodized Aluminum Thickness: 1.5 Mm - 2 Mm Length: 22.86 Cm (minimum) Width: 11.43 Cm (minimum) Depth: 6.9 Cm (minimum) Preferably With Packing Case Extended Sides For An Easy Grip And Smooth Surfaces With No Sharp Edges Food Grade & Oven Safe. Must Be Branded. 650.00 74,100.00 114 Pc Loaf Pan, Small. Type: Loaf Pan Body Shape: Rectangular Material: Anodized Aluminum Thickness: 1.5 Mm - 2 Mm Length: 17.78 Cm (minimum) Width: 7.62 Cm (minimum) Depth: 5.48 Cm (minimum) Preferably With Packing Case Extended Sides For An Easy Grip And Smooth Surfaces With No Sharp Edges Food Grade And Oven Safe Must Be Branded. 600.00 68,400.00 114 Pc Muffin Pan, Big. Type: Muffin Pan Body Shape: Rectangular Material: Anodized Aluminum Thickness: 1.5 Mm (minimum) Dimension: Length-36.6 Cm X Width-22.9 Cm X Height-7.6 Cm (minimum) Cup Size: Height- 8.2 Cm X Diameter 8.9 Cm (minimum) Number Of Cups In A Tray: 6 Cup Preferably With Packing Case Extended Sides For An Easy Grip And Smooth Surfaces With No Sharp Edges Food Grade. Must Be Branded. 800.00 91,200.00 114 Pc Muffin Pan, Medium. Type: Muffin Pan Body Shape: Rectangular Material: Anodized Aluminum Thickness: 1.5 Mm (minimum) Dimension: Length-40 Cm X Width-27.9 Cm X Height-2.8 Cm (minimum) Cup Size: Heigth-5.2 Cm X Diameter 6.9 Cm (minimum) Number Of Cups In A Tray: 12 Cup Preferably With Packing Case. Extended Sides For An Easy Grip And Smooth Surfaces With No Sharp Edges Food Grade. Must Be Branded. 700.00 79,800.00 114 Pc Muffin Pan, Small. Type: Muffin Pan Body Shape: Rectangular Material: Anodized Aluminum Thickness: 1.5 Mm (minimum) Dimension: Length 40.6 Cm X Width-25.4 Cm X Height 2.8 Cm (minimum) Cup Size: Heigth-2.5 Cm X Diameter 3.8 Cm (minimum) Number Of Cups In A Tray: 24 Cup Preferably With Packing Case Extended Sides For An Easy Grip And Smooth Surfaces With No Sharp Edges Food Grade. Must Be Branded. 600.00 68,400.00 114 Pc Pie Pan, 10 Inches Diameter. Type: Pie Pan Body Shape: Round Material: Aluminum, 0.81 Mm Thick (minimum) Diameter -10 Inches (254 Mm) Minimum Depth: 1.25 Inches (31.75 Mm) Minimum Coated With Non-stick Coating Materials Preferably With Packing Case Oven Safe To 500°f / 260°c Food Grade Smooth Finish Surfaces Without Sharp Edges Extended Sides For An Easy Grip. Must Be Branded. 525.00 59,850.00 114 Set Pie Pan, #6, #8, #10 (set). Type Pie Pan Body Shape: Round Material: Aluminum, 0.81 Mm Thick (minimum) 1) # 10 Diameter: 10 Inches (254 Mm) Minimum 2) # 8 Diameter: 8 Inches(203 Mm) Minimum) 3) #6 Diameter: 6 Inches (152 Mm) Minimum Depth: 1.5 Inches (38.1 Mm) Minimum Oven Safe To 500°f / 260°c Coated With Non-stick Coating Materials Preferably With Packing Case Food Grade Smooth Finish Surfaces Without Sharp Edges Extended Sides For An Easy Grip. Must Be Branded. 850.00 96,900.00 114 Pc Pillars, Cake. Type: Cake Pillars, Food Grade Body Shape: Tubular Material: Crystal Clear Fiber Plastic Tube Diameter: 2.5 Cm (minimum) Base And Top Diameter: 3.5 Cm (minimum) Height: 13 Cm (minimum). Packed In Four (4) Pcs Per Set The Materials Used Must Be Non-toxic. Must Be Branded 400.00 45,600.00 76 Pc Rectangular Pan, 1 X 8. Type: Rectangular Pan Body Shape: Square Inn Shape Material: Anodized Aluminum Thickness: 1.63 Mm Thick, Minimum Dimensions: Length- 8 Inches X Width- 8 Inches X Height- 1 Inch (minimum) Oven Safe To 500°f / 260°c Preferably With Packing Case Food Grade And Dishwasher Safe. Must Be Branded. 450.00 34,200.00 114 Pc Rolling Pins. Type: Rolling Pins Body Shape: Tubular In Shape Material: Hardwood (solid Wood In Natural Color) Roller Dimensions: 2.5 Inches Diameter X 9.5 Inches Length (minimum) Handle Dimension: 1 Inch Diameter X 4 Inches Length (minimum) Overall Length: 17.5 Inches (minimum) The Wood Rolling Pin Boasts Rust Proof Nylon Bearings For Smooth Rolling Action Smooth Rotation Of The Revolving Barrel Preferably With Packing Case Smooth Surface Finish With No Sharp Edges Materials Used Must Be Food Grade. Must Be Branded 350.00 39,900.00 114 Pc Rubber Scraper. Type: Rubber Scraper Body Shape: Flat Material: Silicone Blade (head) & Plastic Handle (polypropylene) Color: Any Color Head Length: 11.5 Cm (minimum) Head Width: 7.0 Cm (minimum) Handle Length: 24 Cm To 30 Cm Preferably With Packing Case Safe Working Temperature: -40°f To 446°f The Materials Used Must Be Non-toxic. Must Be Branded 320.00 36,480.00 114 Pc Sauce Pan. Type: Sauce Pan Body Shape: Round In Shape Material: Stainless Steel With Aluminum Core Dimension: Diameter- 16 Cm X Height-8 Cm (minimum) Thickness: 1.8 Mm Thick (minimum) Riveted Stainless Steel Handle Length: 15 Cm (minimum) Capacity: 1 Quart (minimum) Preferably With Packing Case With Stainless Steel Cover, Safe For The Stove, Oven, Broiler And Dishwasher Safe The Materials Used Must Be Non-toxic. Must Be Branded 750.00 85,500.00 114 Pc Sheet Pan. Type: Sheet Pan Body Type: Rectangular Material: Aluminum Thickness: 0.91 Mm Thick (minimum) Dimension: Length-22 Inches X Width-16 Inches X Height-1 Inch (minimum) Preferably With Packing Case Smooth Finish Surfaces Without Sharp Edges Corrosion Resistant Superior Heat Conduction Oven Safe To 500°f / 260°c (maximum) Food Grade Must Be Branded. 350.00 39,900.00 475 Set Spoon, Measuring (set). Type: Measuring Spoon Body Shape: Bowl In Shape Material: Stainless Steel, 0.7 Mm Thick (minimum) The Set Consists Of The Following Sizes: 1 Pc - 1 Tbsp. (15 Ml) 1 Pc - 1/2 Tbsp. ( 7.5 Ml) 1 Pc - 1 Tsp. (5 Ml) 1 Pc - 1/2 Tsp. (2.5 Ml) 335.00 159,125.00 114 Pc Spoon, Wooden. Type: Wooden Spoon Body Shape: Oval Material: Hardwood Dimensions: Length- 10 Inches X Width- 2 Inches (minimum) Bowl Dimension: Length -3 Inches X Width 2 Inches X Depth -3/4 Inches (minimum) Total Length: 10 Inches (minimum) Preferably With A Packing Case Smooth Surface Finished And No Sharp Edges Handle With Provision For Hanging Storage Purposes Must Be Branded 265.00 30,210.00 114 Pc Strainer. Type: Strainer, Medium Fine Body Shape: Round Material: Stainless Steel Strainer Diameter: 20 Cm (minimum) Strainer Depth: 7 Cm (minimum) Handle Length: 18 Cm (minimum) With 2 Mm. (approx.) Fine Mesh Strainer’s Two Layers Of Tightly Woven Mesh Catches Handle Has Provision For Hanging Preferably With A Packing Case Dishwasher Safe. Must Be Branded. 450.00 51,300.00 380 Pc Tip, Decorating. Type: Tube Tips Body Shape: Nozzles With Different Shape Material: Stainless Steel Tube Height: 3.5 Cm To 5 Cm Tube Diameter: 2 Cm To 3.5 Cm Thickness: 0.5 Mm (minimum) Tube Tip: Assorted Designs (create Swirls, Rosettes, Flowers, Roping, Stars, Leaves And Other Designs Comes With 24 Different Shapes Of Nozzles Packed In Plastic Storage Box 895.00 340,100.00 114 Pc Weighing Scale, 10 Kgs. Must Be Branded. 1,632.00 186,048.00 114 Pc Weighing Scale, 5kgs Digital. Type: Mechanical Weighing Scale Body Type: Circular Bowl Material: Stainless Steel Bowl And Metal Body (coated) Mechanism Type: Spring Lever Capacity: 5 Kg /11 Lb. Sensitivity/graduated By 10 Gm Measurement Units: Gram/kilogram Manual Setting On Zero, Must Be Accurate And Durable Calibrate The Scale Using The Adjustment Knob Preferably With A Packing Case Delivery Must Include Instruction Manual Written In Good English With Service Centers Located In The Major Cities In The Philippines Warranty Period Of 1 Year (parts And Service). Must Be Branded 890.00 101,460.00 114 Pc Wire Whisk, Medium. Type Wire Whisk, Medium Body Shape: Ballon Material: Stainless Steel Wire Whisk Medium Dimensions (l X W): 25.4 Cm X 7 Cm (minimum) Handle Length: 10 Cm (minimum) With Hanging Loop No. Of Wires: 6 Wires Wire Diameter: 1.8 Mm (minimum) Preferably With A Packing Case Dishwasher Safe. Must Be Branded. 500.00 57,000.00 24 Pc Apple Corer. Body Shape: Tubular Material: Stainless Steel Total Length: 18 Cm (minimum) Handle Material: Hard Plastic, Polypropylene Handle Dimension: Length-10 Cm X Diameter-2 Cm (minimum) Blade Size: Length-8cm X Diameter-2 Cm (minimum) Preferably With Packing Case. Dishwasher Safe. 350.00 8,400.00 12 Pc Bain Marie, Table. (food Warmer) Body Shape: Rectangular Material: 304 Stainless Steel, 0.8 Mm Thick (minimum) Dimensions: Length-1500 Mm X Width-700mm X Height-800 Mm (minimum) Power Source: Voltage: 220 Volts - 230 Volts, 50 Hz/ 60 Hz With Royal Cord 1.5 Meter Long With Attachment Standard Type A Male Plug Or Provide Plug Adopter 10a/220v 16,000.00 192,000.00 8 Pc Blender, Electric. Body Shape: Round Jar Material Housing: Plastic (polypropylene) Jar Height: 25 Cm To 28 Cm Jar Thickness: 4 Mm To 8 Mm Heat Resistant Glass Jar With Cover Source Voltage: 220 Volts / 240 Volts,50 Hz / 60 Hz With Power Cord 1.5 Meter Long With Attachment Of Standard Type A Male Plug Or Provide Plug Adopter 10a/220v. Power Wattage: 300 To 700 Watts Blade: Stainless Steel, 3 To 4 Metal Blades 5,000.00 40,000.00 64 Pc Board, Chopping/cutting, Plastic. Type: Cutting Board Body Shape: Rectangular Material: Plastic (polypropylene), Food Grade Board Size: Length: 15 Inches (minimum) Width: 12 Inches (minimum) Thickness: 0.5 Inch (minimum) With Hole For Storage Purposes Preferably With Packing Case Food Grade And Dishwasher Safe 400.00 25,600.00 8 Pc Boiler, Double. Material: Stainless Steel Thickness: 1/16 Inch (1.5 Mm) (minimum) Lid Material: Glass Riveted Handle On Both Side Diameter: 9 1/2 Inches (minimum) Total Height: 9.4 Inches (minimum) Inset Bottom Diameter: 9 Inches (minimum) Inset Top Diameter: 9 Inches (minimum) Capacity: 2 Liters (minimum) 2,465.00 19,720.00 32 Pc Braising Pan, Medium. Body Shape: Round Material: Enameled Cast Iron And Stainless Steel Size: Diameter: 28 Cm X Height: 10 Cm (minimum) Capacity: 4 Liters (approximate) With Stainless Steel Cover, Solid Cast Stainless Steel Side Handles And Riveted Handle On Both Side: Length: 10 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm 1,980.00 63,360.00 12 Pc Can Opener. Type: Can Opener Body Shape: Materials: Stainless Steel Dimension: Length-21 Cm X Width 10 Cm X Depth:2.5cm (minimum) Multi-use: 3 In 1 Can Opener Also Opens Bottle Tops- Can Lids And Tabs 300.00 3,600.00 24 Pc Casserole, Medium. Type: Casserole Pot Body Shape: Round Material: Stainless Steel, 0.7 Mm Thick Dimension: Diameter- 24 Cm X Height -14 Cm (minimum) Tempered Glass Lid Welded Handle On Both Sides, Size: 7.5 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm Preferably With Packing Case 1,320.00 31,680.00 48 Pc Casserole, Small. Type: Casserole Pot Body Shape: Round Material: Stainless Steel, 0.7 Mm Thick Dimension: Diameter- 20 Cm X Height -12 Cm (minimum) Tempered Glass Lid Welded Handle On Both Sides, Size: 7.5 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm 300.00 14,400.00 16 Pc Colander, Medium. Type: Colander, Medium Body Type: Round Material: 304 Stainless Steel Diameter: 30 Cm (minimum) Capacity: 8 Quarts (9 Liters) Welded Handle On Both Sides, Size: 7.5 Cm (minimum) Handle Diameter: 8 To 10 Mm 1,225.00 19,600.00 16 Pc Colander, Small. Type: Colander (small) Body Shape: Round Material: 304 Stainless Steel Diameter: 26 Cm (minimum) Capacity: 5 Quarts (5.6 Liters) Welded Handle On Both Sides, Size: 7.5 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm Body Thickness: 0.8 Mm (minimum) Full-ring Support Base, 15 Cm Diameter Preferably With Packing Case. Food Grade And Dishwasher Safe 1,058.00 16,928.00 32 Set Cup, Measuring (for Solid) (set). Type: Measuring Cup Set Body Shape: Round Material: Stainless Steel, 0.7 Mm Thick (minimum) Each Set Contains The Following: 1 Pc - 1 Cup (237 Ml) 1 Pc - 1/2 Cup (118 Ml) 1 Pc - 1/3 Cup (79 Ml) 1 Pc - 1/4 Cup (59 Ml) Handle Dimension: Length-12 Cm X Width-1 Cm (minimum) Measuring Capacity Engraved On The Handle Strip Handles Have Provision For Hanging Preferably With Packing Case Smooth Surfaces And Dishwasher Safe 545.00 17,440.00 16 Pc Dispenser, Paper Towel. Body Shape: Rectangular Material: Abs Plastic Dimensions: Length =260 Mm X Width =100 Mm X Height = 211 Mm (minimum) Capacity: 200 Paper Paper Size: Length-20 Cm X Width- 8 Cm (approximate) Mounting Style: Wall Mounted Tissue Box 978.00 15,648.00 12 Pc Fan, Electric. Stand Fan, Electric Material: Metal, Plastic Size/diameter: 18 Inches Power Rating: 70 Watts (minimum), 220 / 240 Vac, 50 / 60 Hz, Single Phase, Rotation Angle: 90 Degrees Base: Stable, 16 Inches Diameter (approx.) Removable Metal Guard On Front And Rear 3-speed Settings, Comes With 1.5 Meters Power Cord And With Molded Male Plug To Adapt Type A Outlet (or Providing 3a Minimum Plug Adapter Is An Option) Smooth Surface, No Sharp Edges Includes User's Manual In English 2,655.00 31,860.00 8 Pc Fire Extinguisher (with Contents). 1.for Type A, B, C Fire: Dry Chemicals (monoammonium Phosphate) 2.portable Type 3.capacity : 5 - 6 Kgs 4.rechargeable Cylinder Metal 5.working Pressure Of Cylinder : 400 Psi 6.brass Valve With Pressure Gage 7.with Rubberized Hose And Aluminum Nozzle Attached 8.with Squeeze Lever To Discharge And Safety Pin 10.painted With Metal Primer And Red Enamel Paint 2,600.00 20,800.00 8 Pc Fish Poacher, Medium. Type: Fish Poacher Body Shape: Oval Pot For Poaching Material: Stainless Steel, 0.64 Mm Thick Dimensions (l X W X D): 45 Cm X 15 Cm X 12 Cm (minimum) Handle Material: Stainless Steel Riveted Looped Handles On Both Side, 7 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm 2,500.00 20,000.00 16 Pc Fork, Carving. Body Shape: Square Shape Prong Prong Material: High Carbon Stainless Steel Overall Length: 30 Cm (minimum) Blade Dimension: Length- 15 Cm X Width- 0.5 Cm X Thickness- 0.3 Cm (minimum) Number Of Prongs: 2 Prong Comes With Square- Shaped Prongs And Pointed Tips Abs Plastic Triple-riveted Handle. Preferably With Packing Case 585.00 9,360.00 32 Pc Fork, Kitchen (pcs). Body Shape: Standard Material: Stainless Steel Dimension: Length - 32 Cm X Width- 3.5 Cm (minimum) Fork Size: Length: 8 Cm X Width -3.5 Cm (minimum) Handle: Abs Plastic Number Of Tines: 2 Tines With Tapered End 300.00 9,600.00 16 Pc Frying Pan, Large. Body Shape: Round Pan Material: Aluminum With Non-stick Coating Thickness: 3 Mm Thick (minimum) Dimension: Diameter-30 Cm (minimum) X Height- 5.5 Cm (minimum) Handle Material: Stainless Steel With Silicone Riveted Handle: 20 Cm Long (minimum) Preferably With A Packing Case, Oven Safe Up To 250⁰f 878.00 14,048.00 32 Pc Frying Pan, Medium. Body Shape: Round Pan Material: Aluminum With Non-stick Coating Thickness: 3 Mm Thick (minimum) Dimension: Diameter-24 Cm (minimum) X Height- 4.5 Cm (minimum) Handle Material: Stainless Steel With Silicone Riveted Handle: 19 Cm Long (minimum) Preferably With A Packing Case 735.00 23,520.00 48 Pc Frying Pan, Small. Body Shape: Round Pan Material: Aluminum With Non-stick Coating Thickness: 3 Mm Thick (minimum) Dimension: Diameter-20 Cm (minimum) X Height- 3.8 Cm (minimum) Handle Material: Stainless Steel With Silicone Riveted Handle: 12 Cm Long (minimum) Preferably With A Packing Case Oven Safe Up To 250⁰f 625.00 30,000.00 16 Pc Funnel, S/s, Medium. Type: Stainless Steel Funnel Body Shape: Round Material: 304 Stainless Steel Dimension: Diameter-15 Cm (minimum) X Height- 15.8 Cm (minimum) Tube Diameter: 2 Cm X Length: 7.3 Cm (minimum) Comes With Handle For Easy Hanging Preferably With Packing Case Dishwasher Safe 245.00 3,920.00 16 Pc Funnel, S/s, Small. Type: Stainless Steel Funnel Body Shape: Round Material: 304 Stainless Steel Dimension: Diameter-11 Cm (minimum) X Height- 10 Cm (minimum) Tube Diameter: 1.5 Cm X Length: 5 Cm (minimum) Comes With Handle For Easy Hanging Preferably With A Packing Case. Dishwasher Safe 185.00 2,960.00 16 Pc Garbage Bin. Type: Swivel Lid Garbage Bin Body Shape: Round Material: Hard Plastic, Polypropylene Dimension: Diameter-26 Cm X Height-47 Cm (minimum) Capacity: 4 Gallons (minimum) Removable Dome Shape Lid With Spring Return Swivel Preferably With A Packing Case Color: Any Color 685.00 10,960.00 48 Pc Glass Rack. Body Shape: Square Material: Polypropylene Plastic Overall Dimensions: Length - 19 1/2 Inches X Width - 19 1/2 Inches X Height - 4 Inches (minimum) Compartments: Full-size 25 Individual Compartment Glass Rack, Compartment Dimensions: Length - 3 1/2 Inches X Width - 3 1/2 Inches X Height - 4 Inches (minimum) Easy Grip Handles Molded Into All Four Sides Preferably With A Packing Case 2,980.00 143,040.00 8 Pc Ice Cream Scooper. Type: Ice Cream Scooper Body Shape: Round Material: Stainless Steel Scoop: Diameter- 5 Cm X Deep-2.5 Cm (minimum) Handle Length: 10 To 12 Cm 265.00 2,120.00 32 Pc Knife, Boning. Type: Flexible Boning Knife Body Shape: Ergonomic Material: High Carbon Steel Overall Length: 28 Cm (minimum) Blade: Length-15 Cm X Width- 3 Cm (minimum), Pointed Tip Cutting Edge Angle From Tip To The Heel Is 13 To 14 Degrees Handle Length: 12 Cm (minimum) Handle Material: Hard Plastic Handle With Rivets Preferably With Packing Case, Dishwasher Safe 462.00 14,784.00 40 Pc Knife, Chef. Type: Chef's Knife Body Shape: Flat Materials: Stainless Steel Overall Length: 30 Cm (minimum) Blade Size: Length - 20 Cm X Width-4 Cm (minimum) Blade Thickness: 2.5 Mm (minimum) 592.00 23,680.00 12 Pc Knife, Cleaver. Type: Cleaver Knife Body Shape: Flat Blade Material: Forged Stainless Steel Heavy Duty Blade Length: 17 Cm (minimum) Overall Length: 30 Cm (minimum Cutting Edge: Straight Handle Material: Ergonomic Wood Handle With Triple Rivets 1,495.00 17,940.00 16 Pc Knife, Oyster. Body Shape: Ergonomic Blade Material: Stainless Steel Blade Dimension: Length - 7 Cm (minimum) X Width - 2 Cm (minimum) Blade Thickness: 2 Mm (minimum) Handle Material: Smooth Wooded Handle Rounded Handle Size: Length-10 Cm X Diameter- 3.5 Cm (minimum) Total Length (from The Tip Of The Handle Up To Tip Of The Blade) :17 Cm (minimum) 335.00 5,360.00 8 Pc Light, Emergency. Emergency Light, 2 Heads Led Materials: Metal, Anti-rust Coated Duration Time (2 Heads): 5 Hours (minimum) Automatically Light Up During Power Outage Overcharge And Over- Discharge Protection Built - In Ac Charger, Power Cord Plug To Adapt Type A Outlet (or Providing 5a Minimum Plug Adapter Is An Option) Battery Test Switch - External Safety Fuse Head: White Led 1w (minimum) 3.5 " Dome Reflector 2,850.00 22,800.00 8 Pc Meat Slicer, Small. Body Shape: Circular Housing Material: Die Cast Aluminum Alloy And Body Painted Dimensions: Width-40.5 Cm X Depth- 45.7 Cm X Height- 38 Cm (minimum) Stainless Steel Rotary Blade Diameter: 190 Mm (minimum) Power Source: 220 Volts-230 Volts, 60 Hz With Power Cord 1.5 Meter Long With Attachment Of Standard Type A Male Plug Or Provide Plug, Adopter 10a/220v 15,242.00 121,936.00 32 Pc Pastry Tube. Body Shape: Tube In Different Shape Of Nozzles Material: Stainless Steel Set Contain: 24 Different Shapes Of Nozzles (minimum) Tube Height: 3.5 Cm To 5 Cm Tube Diameter: 2 Cm To 3.5 Cm Thickness: 0.5 Mm (minimum) Tube Tip: Assorted Designs (create Swirls, Rosettes, Flowers, Stars, Leaves And Other Designs 168.00 5,376.00 32 Pc Peeler, Y-type. Body Shape: Ergonomic, Material: Stainless Steel Overall Dimensions (l X W X H): 7 Inches X 2 1/4 Inches X 1 Inch (minimum) Blade Material: 304 Stainless Steel, 0.7 Mm Head Dimension: (l X W X H) 2 1/4 Inches X 2 1/4 Inches X 1 Inch (minimum) Handle Material: Stainless Steel Handle Length: 4 3/4 Inches X 1 Inch Diameter (minimum) 295.00 9,440.00 32 Pc Pepper And Salt Mill. Body Shape: Round Body Material: Wood Size: Diameter: 5 Cm X Height: 20 Cm (minimum) Carved Of Wood With Stainless Steel Grinding Mechanism, Color: Natural Screw Cap At The Top Of The Mill To Adjust The Thickness Of Peeper Or Spices Preferably With A Packing Case 500.00 16,000.00 32 Pc Piping Bag (packs). Body Shape: Triangular Material: Transparent Disposable Plastic For Dispensing Ingredients To Pastries Length: 9 Inches Minimum Width: 3 Inches (minimum) Volume: 500 Ml (approximate) 265.00 8,480.00 48 Pc Plate Rack. Type: Plate Rack Body Shape: Rectangular Material: 304 Stainless Steel Dimension: Length-475 Mm X Width- 290 Mm X Height- 380 Mm (minimum) 4,890.00 234,720.00 24 Pc Preparation Table With Sink. Type: Preparation Table With Sink & Shelves Body Shape: Rectangular Material: Stainless Steel, 1 Mm Thick (minimum) Dimensions: L-1200 Mm X W - 700 Mm X H - 850 Mm (minimum) Stainless Steel Table Top And Stainless Steel Under Shelf Fully Welded Construction Sink: Left Side Single Bowl Sink With Drainer 4 Inches & Faucet Provision Sink Dimension (l X W X D) 400 Mm X 500 Mmx 25 Mm (minimum) 20,000.00 480,000.00 8 Pc Pressure Cooker. Type: Pressure Cooker Body Shape: Round Material: Polished Aluminum Dimension: Diameter: 32 Cm X Height: 25 Cm (minimum) Capacity: 10 Quarts (11.3 Liters) Side Handles For Secure Carrying Equipped With Safety Opening Mechanism, Spring Safety Valve, Rubber Seal Ring 4,760.00 38,080.00 16 Pc Roasting Pan. Type: Roasting Pan Body Shape: Rectangular Material: Stainless Steel Dimension: Length: 40 Cm X Width-35 Cm X Height -7 1/2cm (minimum) Thickness: 1.5 Mm Thick (minimum) Welded Handles On Both Sides Removable Stainless Steel Wire Rack 1,400.00 22,400.00 32 Pc Scissors, Kitchen. Type: Kitchen Scissor Body Shape: Ergonomic Blade Material: Stainless Steel, 2 Mm Thick Handle Material Heavy Duty Acrylonitrile Butadiene Styrene (abs) Plastic Overall Length: 20 Cm (minimum ) Width: 7.5 Cm (minimum) 250.00 8,000.00 32 Pc Siever, Small. Type: Fine Mesh Siever Body Shape: Round Material: Stainless Steel Diameter: 20 Cm (minimum) Depth: 7 Cm (minimum) Twin Wire Handle: Length 20 Cm X 5 Mm Diameter (minimum) Fine Mesh: 0.7 Mm (1/32 Inch) (minimum) Preferably With A Packing Case 475.00 15,200.00 32 Pc Skimmer, Fine. Type: Medium Fine Mesh Skimmer Body Shape: Round Material: Stainless Steel, Polished Overall Length: 34 Cm (minimum) Skimmer Head: Diameter -10 Cm X Depth- 4 Cm (minimum) Diameter Of Holes: 2 Mm (approx.) Handle: Length- 12 Cm X Diameter- 2 Cm (minimum) Handle Has Hole For Hanging Preferably With A Packing Case 140.00 4,480.00 32 Pc Skimmer, Spider. Body Shape: Round Material: Stainless Steel, Polished Overall Length: 35 Cm (minimum) Skimmer Head Diameter: 15 Cm X Depth 4 Cm (minimum) Handle Length: 12 Cm X 2 Cm Diameter (minimum) Preferably With A Packing Case Dishwasher Safe 435.00 13,920.00 48 Pc Soup Cup Rack. Type: Soup Cup Rack Body Shape: Square Material: Polypropylene Plastic Dimension: Length: 50 Cm X Width: 50 Cm X Height: 10 Cm (minimum) Compartment Length: 11 Cm Compartment Width: 11 Cm Compartment /inside Height: 6.7 Cm No. Of Compartment: 16 Compartments 2,000.00 96,000.00 32 Pc Soup Ladle, 3oz. Body Shape: Round Material: Stainless Steel Thickness: 1 Mm Thick (minimum) Handle Length: 28 Cm (minimum) Capacity: 3 Oz. (85 Ml) Ladle Type: Round Bottom Hooked Handle Design Allows It To Easily Sit On The Edge Of Pots. Preferably With A Packing Case, Dishwasher Safe 250.00 8,000.00 32 Pc Soup Ladle, 6oz. Body Shape: Round Material: Stainless Steel Thickness: 1 Mm Thick (minimum) Handle Length: 30 Cm (minimum) Capacity: 6 Oz. (170 Ml) Ladle Type: Round Bottom Hooked Handle Design Allows It To Easily Sit On The Edge Of Pots. Preferably With A Packing Case. Dishwasher Safe. 290.00 9,280.00 16 Pc Soup Ladle, 8oz. Body Shape: Round Material: Stainless Steel Thickness: 1 Mm Thick (minimum) Handle Length: 30 Cm (minimum) Capacity: 8 Oz. (236 Ml) Ladle Type: Round Bottom Hooked Handle Design Allows It To Easily Sit On The Edge Of Pots. Preferably With A Packing Case 350.00 5,600.00 16 Pc Soup Ladle, 12oz. Body Shape: Round Material: Stainless Steel Thickness: 1 Mm Thick (minimum) Handle Length: 34 Cm (minimum) Capacity: 12 Oz. (341 Ml) Ladle Type: Round Bottom Hooked Handle Design Allows It To Easily Sit On The Edge Of Pots. Preferably With A Packing Case. Dishwasher Safe. 400.00 6,400.00 32 Pc Spatula. Type: Offset Spatula Body Shape: Flat Blade Material: Stainless Steel 316 Handle Material: Hardwood (smooth Finish) With Rivets Blade Dimension: Length= 7 .5 Inches X Width-1.5 Inches (minimum) Thickness Of Blade: 1.7 Mm Thick (minimum) Total Length = 12 To 14 Inches Preferably With A Packing Case Dishwasher Safe. Must Be Branded. 365.00 11,680.00 32 Pc Spoon, Kitchen. Type: Kitchen Spoon Body Shape: Oval Material: Stainless Steel, 1.5 Mm Thick Overall Length: 30.5 Cm X Width-7.5 Cm (minimum) Spoon Head Dimension (l X W) 9 Cm X 7.5 Cm (minimum) Handle: Abs Plastic Spoon Head: Oval Type Preferably With A Packing Case Heat Resistant Up To 220 ° C Dishwasher Safe. Must Be Branded. 300.00 9,600.00 32 Pc Spoon, Kitchen (slotted). Type: Kitchen Spoon Slotted. Body Shape: Oval With Slot Material: Stainless Steel, 1.5 Mm Thick Overall Length: 30.5 Cm X Width-7.5 Cm (minimum) Spoon Head Dimension (l X W) 9 Cm X 7.5 Cm (minimum) Handle: Abs Plastic Spoon Head: Oval Type With Slot At Least 6 Rectangular Slots. Preferably With A Packing Case Heat Resistant Up To 220 ° C. Dishwasher Safe 425.00 13,600.00 32 Set Spoon, Measuring (set). Type: Measuring Spoon Body Shape: Bowl In Shape Material: Stainless Steel, 0.7 Mm Thick (minimum) The Set Consists Of The Following Sizes: 1 Pc - 1 Tbsp. (15 Ml) 1 Pc - 1/2 Tbsp. ( 7.5 Ml) 1 Pc - 1 Tsp. (5 Ml) 1 Pc - 1/2 Tsp. (2.5 Ml) 335.00 10,720.00 32 Pc Spoon, Parisienne. Type: Parisiennes Spoon Body Shape: Round Double Headed Parisiennes Scoop Bar Tool Material: Stainless Steel, Polished Overall Length: 240 Mm (minimum) Scoop Diameter: 30 Mm And 24mm (minimum) With Plastic Handle (polypropylene), Size: 130 Mm X Width-20 Mm (minimum) Draining Small Hole In The Scoop 345.00 11,040.00 96 Pc Spoon, Serving. Body Shape: Oval Materials: Stainless Steel Dimension: Length: 23 Cm X Width: 5 Cm (minimum) Scoop Dimension (l X W X D): 7 Cm X 5 Cm X 0.9 Cm (minimum) Spoon Thickness: 1.6 Mm (minimum) Preferably With A Packing Case Dishwasher Safe. Must Be Branded. 200.00 19,200.00 32 Pc Spoon, Wooden. Body Shape: Oval Material: Hardwood Dimensions: Length- 10 Inches X Width- 2 Inches (minimum) Bowl Dimension: Length -3 Inches X Width 2 Inches X Depth -3/4 Inches (minimum) Total Length: 10 Inches (minimum) Preferably With A Packing Case Smooth Surface Finished And No Sharp Edges 300.00 9,600.00 16 Pc Stock Pot, Large. Type: Stock Pot, Large Body Shape: Round Material: Stainless Steel, 0.8 Mm Thick (minimum) Top Diameter: 30 Cm (minimum) Height: 31 Cm (minimum) Capacity: 20 Quarts (22.7 Liters) Oven Safe To 350⁰f And Dishwasher Safe. With Aluminum Disc Layer In Bottom For Even Heat (5 Mm Aluminum 3,590.00 57,440.00 16 Pc Strainer, Chinois, Medium. Type: Strainer Chinois, Medium Body Shape: Conical Material: Stainless Steel Strainer Diameter: 20 Cm (minimum) Strainer Depth: 21.5 Cm (minimum) Handle Length: 20 Cm (minimum) With 2 Mm. (approx.) Fine Mesh Handle Has Provision For Hanging Preferably With A Packing Case Dishwasher Safe Must Be Branded 735.00 11,760.00 16 Pc Strainer, Chinois, Small. Strainer Chinois, Small Body Shape: Conical Material: Stainless Steel Strainer Diameter: 14 Cm (minimum) Strainer Depth: 13 Cm (minimum) Handle Length: 15 Cm (minimum) With 1 Mm (approx.) Fine Mesh Handle Has Provision For Hanging Preferably With A Packing Case Dishwasher Safe Must Be Branded 675.00 10,800.00 32 Pc Strainer Medium, Fine. Type: Strainer, Medium Fine Body Shape: Round Material: Stainless Steel Strainer Diameter: 20 Cm (minimum) Strainer Depth: 7 Cm (minimum) Handle Length: 18 Cm (minimum) With 2 Mm. (approx.) Fine Mesh Strainer’s Two Layers Of Tightly Woven Mesh Catches Handle Has Provision For Hanging Preferably With A Packing Case Dishwasher Safe Must Be Branded. 465.00 14,880.00 32 Pc Strainer Small, Fine. Type: Strainer, Small Fine Body Shape: Round Material: Stainless Steel Strainer Diameter: 13 Cm (minimum) Strainer Depth: 5 Cm (minimum) Handle Length: 13 Cm (minimum) With 1 Mm. (approx.) Fine Mesh Handle Has Provision For Hanging Preferably With A Packing Case Dishwasher Safe. Must Be Branded 325.00 10,400.00 20 Pc Table, Working. Type: Working Table, Stainless Steel. Body Shape: Rectangular Material: 304 Stainless Steel, 1.29 Mm Thick (gauge 16) Minimum Length: 1220 Mm (minimum) Width: 700 Mm (minimum) Height: 850 Mm (minimum) Tubular Stainless Steel Legs, 38mm (minimum) With 4 Adjustable Bullet Feet Fully Welded Construction Thickness: Gauge 16 (1.29 Mm Thick) Minimum Stainless Steel Table Top With Stainless Steel Undershelf Distance Between Table Top And Undershelf Is 650 Mm (minimum) Preferably With A Packing Case Or Crate No Sharp Edges And Rough Surfaces. Must Be Branded. 19,500.00 390,000.00 32 Pc Tenderizer, Medium. Type: Tenderizer Body Shape: Ergonomic Material: Cast Aluminum Overall Length: 26 Cm (minimum) Dual-sided Hammer, Square Head: 6 Cm X 6 Cm (minimum) Ridged Surface With Rows Of Dull, Pyramid-shaped Spikes, Weight: 250 Grams To 500 Grams Preferably With A Packing Case Dishwasher Safe. Must Be Branded 315.00 10,080.00 16 Pc Thermometer, Pocket/pin. Type: Pocket/pen Thermometer Body Shape: Tubular Pen Style Digital Thermometer Product Size: 100 Mm X 40 Mm X 14 Mm (minimum) Display Size: 40 Mm X 20 Mm (minimum) Prove Length: 200 Mm (minimum) Measuring Range: -50 °c To 300 °c (-58 ⁰f To 372 ⁰f) Resolution: 0.1 °c / 0.2 °f 600.00 9,600.00 32 Pc Tong, 12 Inches. Body Shape: Standard Material: Stainless Steel Size: 12 Inches Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Tongs Lock Closed For Storage Preferably With A Packing Case Food Grade And Dishwasher-safe. Must Be Branded 320.00 10,240.00 40 Pc Tong, 8 Inches. Body Shape: Standard Material: Stainless Steel,size: 8 Inches Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Tongs Lock Closed For Storage Preferably With A Packing Case. Food Grade And Dishwasher-safe 250.00 10,000.00 32 Pc Tray, Baking, Small. Type: Baking Tray Body Shape: Rectangular Material: Stainless Steel Dimension: 20 Cm X 30 Cm X 3.7 Cm (minimum) Body Thickness: 0.7- 1.0 Mm Preferably With Packing Case Dishwasher Safe. Must Be Branded 556.00 17,792.00 48 Pc Tray, Utility. Type: Utility Tray Body Shape: Rectangular Material: Stainless Steel Dimension: Length- 48 Cm X Width-32 Cm X Height-2.5 Cm (minimum) Reinforced Edges Finish: Polished. Preferably With A Packing Case. Washable And Oven Safe 485.00 23,280.00 32 Pc Turner 3" X 6. Body Shape: Straight Material: Stainless Steel Blade Size (lx W): 6 Inches X 3 Inches (minimum) Handle Length: 5 Inches (minimum) Overall Length: 13 Inches (minimum) Solid Turner With Straight Slotted Blade Wooden Handle With Triple Rivets Preferably With A Packing Case Dishwasher Safe. Must Be Branded 398.00 12,736.00 8 Pc Utility Cart. Body Shape: Rectangular Material: Plastic, Polypropylene(pp) Dimension: (l X W X H) 84 Cm X 43 Cm X 95 Cm (minimum) Capacity: 330 Lbs (150 Kg) Loads (minimum) Three (3) Shelving With At Least 25 Cm Distance Between Shelves Tub Shelf Measure (l X W X D) 84 Cm X 43 Cm X 7 Cm (minimum) With Four (4) Swivel Caster, 10 Cm Diameter, Two Which Have Locking Brakes Preferably With A Packing Case Easy Grip Handles On Each End Of Cart 5,000.00 40,000.00 16 Pc Weighing Scale, 1 Kg Digital. Type: Digital Weighing Scale, Body Shape: Rectangular Materials: Engineering Plastic And Stainless Steel Weighing Plate, Capacity: 1 Kg, Accuracy: 1 Gram Back Light Lcd Display With 15 Mm Minimum High Digits, Weighing Units: Gram, Ounce, Pound Size: (l X W X H Mm ) 163 Mm X 245 Mm X 79 Mmm (minimum) 720.00 11,520.00 8 Pc Weighing Scale, 5 Kilograms, Mechanical. Type: Mechanical Weighing Scale Body Type: Circular Bowl Material: Stainless Steel Bowl And Metal Body (coated) Mechanism Type: Spring Lever Capacity: 5 Kg /11 Lb. Sensitivity/graduated By 10 Gm Measurement Units: Gram/kilogram Manual Setting On Zero, Must Be Accurate And Durable Calibrate The Scale Using The Adjustment Knob Preferably With A Packing Case Delivery Must Include Instruction Manual Written In Good English With Service Centers Located In The Major Cities In The Philippines Warranty Period Of 1 Year (parts And Service) Must Be Branded 1,540.00 12,320.00 32 Pc Wire Skimmer, Small. Type: Skimmer, Wire Mesh Body Shape: Round Material: Stainless Steel, Polished Overall Length: 40 Cm (minimum) Skimmer Head Diameter: 12 Cm (minimum) Diameter Of Holes: 2 Mm (approx.) Handle Has Hole For Hanging. Preferably With A Packing Case. Dishwashing Safe. Must Be Branded. 295.00 9,440.00 16 Pc Wire Whisk, Heavy Duty. Type: Wire Whisk, Heavy Duty. Body Shape: Ballon Material: Heavy Duty Stainless Steel Dimensions (l X W): 31.8 Cm X 7.6 Cm (minimum) Handle Length: 12 Cm (minimum) With Hanging Loop No. Of Wires: 8 Wires Wire Diameter: 2 Mm (minimum) Preferably With A Packing Case Dishwasher Safe. Must Be Branded. 335.00 5,360.00 32 Pc Wire Whisk, Medium. Type Wire Whisk, Medium Body Shape: Ballon Material: Stainless Steel Wire Whisk Medium Dimensions (l X W): 25.4 Cm X 7 Cm (minimum) Handle Length: 10 Cm (minimum) With Hanging Loop No. Of Wires: 6 Wires Wire Diameter: 1.8 Mm (minimum) Preferably With A Packing Case Dishwasher Safe. Must Be Branded 425.00 13,600.00 32 Pc Wire Whisk, Small. Type: Wire Whisk, Small Body Shape: Balloon Material: Stainless Steel Wire Whisk Medium Dimensions (l X W): 20.3 Cm X 6 Cm (minimum) Handle Length: 10 Cm (minimum) With Hanging Loop No. Of Wires: 6 Wires Wire Diameter: 1.8 Mm (minimum) Preferably With A Packing Case Dishwasher Safe. Must Be Branded. 385.00 12,320.00 8 Pc Wok, Medium. Body Shape: Round Material: Carbon Steel Thickness: 1.8 Mm Thick (minimum) Dimensions (dia. X H): 45 Cm X 14 Cm (minimum) Handle Material: Steel Riveted Convenient Both Side Handle 10 Cm (minimum) With Flat Bottom. Preferably With A Packing Case Dishwashing Safe. Must Be Branded 1,950.00 15,600.00 16 Pc Wok, Small Body Shape: Round Material: Carbon Steel Thickness: 1.5 Mm Thick (minimum) Dimensions (dia. X H): 36 Cm X 10 Cm (minimum) Handle Material: Steel Riveted Convenient Both Side Handle 8 Cm (minimum) With Flat Bottom. Preferably With A Packing Case Dishwashing Safe. Must Be Branded 1,650.00 26,400.00 32 Pc Zester. Body Shape: Standard Material: Stainless Steel Grating Surface Dimensions (l X W): 20.3 Cm X 4 Cm (minimum) Overall Length: 32.5 Cm (minimum) Handle Material: Plastic (polypropylene) Ergonomic Handle. Preferably With A Packing Case Dishwasher Safe. The Plastic Material Used Must Be Non-toxic. Must Be Branded. 390.00 12,480.00 768 Pc Chair, Dining. Type : Dining Side Chair Body Shape: Square Material : Metal (round Or Square) Dimension: Total Height - 33" X 15" X15" (minimum) Capacity: 150 Kg. Black Colored Powder Coated Frame With Foam On Seat Packed In Carton Box The Item Must Have Good Quality. 2,200.10 1,689,676.80 32 Pc Coffee Pot, 2 Pints. Type: Manual Drip Body Shape: Round Material : Stainless Steel With Cover Capacity : 2 Pints Outside Diameter : 90 -110 Mm Over-all Height : 200 - 230 Mm Thickness : 0.5 - 1 Mm With Handle And Spout Packed In Carton Box. The Item Must Have Good Quality 1,156.00 36,992.00 80 Pc Container, Creamer. Design: Type: Porcelain With Spout Body Shape: Circular Material: Porcelain Diameter: 50 - 65 Mm Height : 80 – 105 Mm Color: White Appearance : Glossy White Packed In Carton Box. The Item Must Have Good Quality 328.00 26,240.00 384 Pc Cups And Saucers 5-6 Oz. 1. Material: Porcelain 2. Capacity: 5 Oz./140 Ml 3. Heatproof Up To 300 Deg. C 4. Color: White 5. The Item Must Be Of Good Quality 6. Packed In Carton Box 285.00 109,440.00 384 Pc Fork, Cocktail. 1. Material/appearance: Stainless Steel, Highly Polished, W/ Plain Design 2. Type : Rounded Tip Handle 3. Over-all Length : 110 - 165 Mm 4. Width : 20 - 30 Mm (minimum) 5. Handle Thickness : 2 Mm To 4 Mm 6. Handle Length : 75 - 90 Mm 7. Small, 8. Color : Silver 9. The Item Must Be Branded And Have Good Quality. 195.00 74,880.00 384 Pc Fork, Dessert. Type : Dessert Fork Body Shape: Fork Shape, Round Tip Material/appearance : Stainless Steel, Highly Polished, With Plain Design, Rounded Tip Handle Length : 150 Mm - 175 Mm Width : 20 - 30 Mm Handle Thickness : 1.5 Mm - 3 Mm Number Of Tines : 4 Handle : 130 Mm (minimum) Color : Silver Packed In Plastic Pouch The Item Must Be Of Good Quality 195.00 74,880.00 384 Pc Fork, Dinner. Type: Dinner Fork Body Shape: Fork Shape Material / Appearance : Stainless Steel, Highly Polished, With 4 Tines Over - All Length : 120 - 175 Mm Thickness Of Handle : 2 - 3 Mm Color : Silver, Packed In Plastic Pouch The Item Must Be Of Good Quality 185.00 71,040.00 384 Pc Fork, Fish. Type : Fish Fork Body Shape: Fork Shape With Round Tip Material / Appearance : Stainless Steel, Highly Polished, With Plain Design Over-all Length : 180 - 215 Mm Fork Width : 1.5 Mm - 3 Mm Fork Thickness : 1 Mm - 2 Mm Number Of Tines : 4 Length Handle : 120 - 130 Mm Handle Thickness : 2 Mm - 3 Mm Color : Silver. Packed In Plastic Pouch. The Item Must Be Of Good Quality 195.00 74,880.00 384 Pc Fork, Oyster. Type: Oyster Fork Body Shape: Fork Shape Material: Stainless Steel, With High Polish Appearance, And With Plain Design Length: 90 - 120 Mm Thickness: 1 Mm - 3 Mm Silver Color With Three Short Wide Curved Tines Packed In Plastic Pouch The Item Must Be Of Good Quality 225.00 86,400.00 384 Pc Glass, Champagne Flute. Type : Flute Glass Body Shape: Round Material: Clear Crystal Glass Dimension : Height: 20 -24 Cm, Top Diameter: 50 -70 Mm, Bottom Diameter: 60 - 80 Mm Capacity: 250 Ml. (minimum) Thickness: 1.5 - 3 Mm Packed In Carton Box The Item Must Have Good Quality 170.00 65,280.00 384 Pc Glass, Collins. Type: Tumbler Body Shape: Round Material : Clear Glass Capacity : 10 Oz To 14 Oz Thickness : 1.5 -3 Mm (minimum) Packed In Carton Box The Item Must Have Good Quality 102.00 39,168.00 384 Pc Glass, Juice/ Hi-ball. 1. Material : Clear Glass 2. Type : Hi-ball 3. Height : 140 - 160 Mm 4. Bottom Diameter : 50 -70 Mm 5. Top Diameter : 50 - 70 Mm 6. Thickness : 2 - 4 (minimum) 7. Capacity : 8 Oz. To 10 Oz. 8. Dishwasher Safe 9. The Item Must Be Branded And Good Quality 10. Packed In Carton Box 115.00 44,160.00 384 Pc Glass, Pilsner (ice Tea Glass). Type: Flaired Rim Body Shape: Round Slender Material: Clear Glass Capacity: 20 Oz. To 23 Oz. Over-all Length: 22 -25 Cm Thickness Of Glass : 1 -3 Mm With Flared Rim And Slender Shape Packed In Carton Box The Item Must Have Good Quality 120.00 46,080.00 384 Pc Glass, Red Wine. Type: Royalty Body Shape: Balloon Shaped Bowl Material: Crystal Clear Glass Rim Diameter : 55 - 60 Mm Thickness : 1.5 Mm - 3 Mm Over - All Length : 200 -220 Mm Capacity : 250 -300 Ml Stem Diameter : 6 - 8 Mm Stem Length : 85 - 90 Mm Base Diameter : 75 - 85 Mm Base Thickness : 2 - 4 Mm 300.00 115,200.00 384 Pc Glass, White Whine. Type: Royalty Body Shape: Balloon Shaped Bowl Material: Crystal Clear Glass Rim Diameter : 55 - 60 Mm Thickness : 1.5 - 3 Mm Over -all Length : 200 -220 Mm Capacity : 270 - 300 Ml Stem Diameter : 6 - 8 Mm Stem Length : 75 - 85 Mm Base Diameter : 70 - 80 Mm Base Thickness : 2 - 5 Mm 300.00 115,200.00 96 Pc Gravy Boats. Type: Steel Type Body Shape: Boat Shape With Handle Material: Stainless Steel Capacity : 5 Oz. Appearance: Mirror Polish Finish Size :17cm X 7.3cm X 8.2 Cm / 6.7 X 2.9 X 3.2 Inches (minimum) The Item Must Have Good Quality Packed In Plastic Pouch 560.00 53,760.00 64 Pc Ice Bucket, 2 Liters With Tongs. Type: Steel Type, Body Shape: Circular Set Includes: A. Ice Bucket Material : Stainless Steel Diameter : 140 - 180 Mm Height : 140 - 170 Mm Thickness Of Bucket : 0.7 - 2 Mm Capacity : 2 Liters (minimum) The Item Must Have Good Quality 496.00 31,744.00 384 Pc Knife, Butter. 1. Material : Stainless Steel W/ Highly Polished Appearance 2. Over-all Length : 140 Mm - 150 Mm 3. Handle Thickness : 3 Mm - 5 Mm 4. With Dull Edge And Rounded Tip 5. The Item Must Have Good Quality. 6. Packed In Carton Box 180.00 69,120.00 384 Pc Knife, Dinner. Type: Dinner Knife Body Shape: Flat With Round Tip Material / Appearance : Stainless Steel Blade Highly Polished Handle Material : Stainless Steel Overall Length : 160 - 190 Mm Blade Thickness : 2 - 4 Mm Handle Thickness : 3 - 6 Mm Serrated Blade With Rounded Tip Packed In Carton Box The Item Must Have Good Quality 180.00 69,120.00 384 Pc Knife, Fish. Type : Fish Knife Body Shape: Flat With Pointed Tip Material / Appearance : Stainless Steel, Highly Polished W/ Plain Design Overall Length : 200 - 220 Mm Width Blade : 20 - 25 Mm Thickness Of Blade : 2 Mm - 4 Mm Thickness Of Handle: 3 Mm - 6 Mm Wide Blade, Dull Edge, Tip Made With A Notched Point Color : Silver, Packed In Carton Box The Item Must Have Good Quality 180.00 69,120.00 64 Pc Folder, Menu. Type: Leather Menu Folder Body Shape: Rectangular Material: Leather With 2 Partitions And 6 Inserts Size: 31.5cm X 24.5cm Color: Brown/black Applicable Paper Size: A4 234.00 14,976.00 96 Pc Napkin Holder. Type: Steel Type Body Shape: Rectangular Material : Stainless Steel With Highly Polished Appearance Dimension : Width : 70 - 90 Mm X Length : 150 - 170 Mm , Thickness : 0.7 Mm -2 Mm Packed In Plastic Pouch The Item Must Have Good Quality 350.00 33,600.00 64 Pc Order Pads. Type: Numbered Pads Body Shape: Rectangular Material : 80 Gsm Offset Paper Each Pad Comes With A 100 Sheets And Corresponding Copy Page Each Pad Has Sequentially Numbered Orders To Make It Easy To Keep Track With 100 Sheets Per Pad And 10 Pads Included Can Take 1000 Orders Before You Run Out Packed In A Plastic Pouch 85.00 5,440.00 64 Pc Pepper And Salt Mill. Type: Pepper & Salt Mill Body Shape: Round Body Material: Wood Size: Diameter: 5 Cm X Height: 20 Cm (minimum) Carved Of Wood With Stainless Steel Grinding Mechanism Color: Natural Screw Cap At The Top Of The Mill To Adjust The Thickness Of Peeper Or Spices Preferably With A Packing Case Food Grade And Nontoxic. Must Be Branded 500.00 32,000.00 128 Pc Plate Covers. Type: Steel Type Body Shape: Circular Material: Stainless Steel, Mirror Polished Diameter: 10 1/4 Inches (minimum) Height: 2 7/8 Inches (minimum) Thickness: 1/16 Inch. (minimum) With Handle, Packed In Plastic Pouch The Item Must Have Good Quality 600.00 76,800.00 384 Pc Plate, Dessert, 7" To 8" . Type: Plain Type Body Shape: Circular Material: Porcelain Supply Must Be A Set, Consisting Of One (1) Of Each: 7 Inches And 8 Inches Plates Color : White Inner Diameter: 145 To 165 Mm Thickness : 3 To 6 Mm Smooth And Glossy Surfaces Packed In Carton Box, The Item Must Have Good Quality 225.00 86,400.00 384 Pc Plate, Dinner, 10". Type: Plain Type Body Shape: Circular Material: Porcelain With No Design Color: White Inner Diameter : 200 Mm - 215 Mm Outer Diameter : 250 - 260 Mm Thickness : 3 Mm - 6 Mm Smooth And Glossy Surfaces Packed In Carton Box The Item Must Have Good Quality 265.00 101,760.00 384 Pc Plate, Fish, 8" To 9" . Type: Plain Type, Body Shape: Circular, Material : Porcelain With No Design Supply Shall Be A Set Consisting Of: One (1) Each 8 Inches And One (1) Each, 9 Inches Color : White, Inner Diameter : 165 Mm - 190 Mm (minimum) Thickness : 3 Mm - 6 Mm Smooth And Glossy Surfaces Packed In Carton Box The Item Must Have Good Quality 225.00 86,400.00 128 Pc Table, Round (8's). Type: Foldable Body Shape: Round Material: High Density Polyethylene Table Top Powder Coated Steel Frame Size: 154cm X 74cm X4.5cm (minimum) Good For 8 To 10 Seater Capacity Tube Size : 28 Mm Diameter X 1 Mm Thickness Packed In A Carton Box. The Item Must Have Good Quality 6,500.00 832,000.00 384 Pc Fork, Salad. Type: Salad Fork Body Shape: Fork Shape Material/appearance: Stainless Steel, Highly Polished, With 4tines, Length: 150 Mm - 175 Mm Thickness Of Handle : 2 Mm - 3 Mm Color: Silver Packed In Plastic Pouch Item Must Be Of Good Quality. 125.00 48,000.00 384 Pc Knife, Salad. Type: Salad Knife Body Shape: Semi Rectangular Blade With Pointed Tip Material/appearance: Stainless Steel, Highly Polished, W/ Plain Design Overall Length: 145 -160 Mm Blade Thickness: 2 Mm To 4 Mm Handle Thickness: 4 Mm To 6 Mm Handle Material: Stainless Steel Rounded Tip Handle Packed In Carton Box The Item Must Have Good Quality 125.00 48,000.00 384 Pc Salad Plates 7" To 8" . Type: Plain Type Body Shape: Circular Material: Porcelain With No Design Supply Must Be A Set Consisting Of One (1) Each: 7 Inches And 8 Inches Plates Color: White Diameter (inner): 150 Mm - 165 Mm Thickness: 3 Mm - 6 Mm Smooth And Glossy Surfaces Packed In Carton Box. The Item Must Have Good Quality 215.00 82,560.00 64 Pc Salt And Pepper Shakers. Type: Glass Type Body Shape: Square Material: Glass And Aluminum Over-all Height: 75 -90 Mm Length: 50 -60 Mm, Width: 50 -60 Mm Aluminum Cover. Packed In Carton Box The Item Must Have Good Quality 550.00 35,200.00 64 Pc Sauce Ladles. Type: Spouted Bowl Body Shape: Circular With Pouring Spout Material: Stainless Steel, Highly Polished Appearance Over-all Length: 220 -230 Mm Ladle Bowl Length: 60 -65 Mm Long Ladle Bowl Diameter: 65 -70 Mm Depth: 10 -15 Mm Handle Details: 150-155 Mm Long X 20 -30 Mm Wide X 2 - 4 Mm Thick, Color: Silver With Hang Hole For Hanging And Easy Access Dishwasher Safe. Packed In Plastic Pouch The Item Must Have Good Quality 395.00 25,280.00 64 Pc Server, Cake. 1. Material : Stainless Steel Blade , Highly Polished Appearance 2. Over-all Length : 220 To 270 Mm 3. Width : 60 - 80 Mm 4. Thickness : 1.5 Mm To 2 Mm 5. Handle : 120 -140 Mm Long, Non-toxic Plastic 6. Shape : Shovel-shaped 7. Color : Silver 8. The Item Must Have Good Quality 9. Packed In Carton Box 367.00 23,488.00 192 Pc Service Forks. Type : Service Fork Body Shape: Fork Shape Material/appearance: Stainless Steel, Highly Polished, W/ Palin Design Over-all Length: 220 Mm - 260 Mm Width: 20 - 25 Mm Handle Thickness: 1.5 Mm - 4 Mm Handle Length - 165 Mm - 185 Mm 4 Tines, Color: Silver. Packed In Plastic Pouch 125.00 24,000.00 192 Pc Service Tray. Type: Plastic Body Shape: Rectangular Material: Plastic (pp) Size : 14 Inches X 18 Inches X 1 Inch (minimum) Color : Any, Packed In Plastic Pouch The Item Must Have Good Quality 628.00 120,576.00 192 Pc Show/service/base Plates 11" To 14" . Type: Plain Type Body Shape: Round Material: Porcelain With No Design Supply Must Be A Set Consisting (1) Of Each: - 11 Inches, - 12 Inches, - 13 Inches, And - 14 Inches Plates Color: White. Diameter, Inner : 225 Mm - 250 Mm Thickness: 3mm - 6 Mm. Smooth And Glossy Surfaces 574.00 110,208.00 384 Pc Side Plates Or Bread Plates 6" .type: Plain Type Body Shape: Round Material: Porcelain With No Design Color: White Inner Diameter: 95 Mm To 120 Mm Outer Diameter: 145 Mm To 170 Mm Thickness : 3 Mm - 6mm Smooth And Glossy Surfaces Packed In Carton Box. The Item Must Have Good Quality 135.00 51,840.00 192 Pc Side Towels. Type: Chef's Towel Body Shape: Rectangular Material: Oxford Polyester Soft Cloth Over-all Length : 640 - 680 Mm Over-all Width : 420 -460 Mm Color : Plain White Packed In Plastic Pouch. The Item Must Have Good Quality 280.00 53,760.00 192 Pc Silver Platter. Type: Steel Type Body Shape: Round Material: Stainless Steel Diameter: 300 -330 Mm Thickness: 1 - 2 Mm Packed In Plastic Pouch The Item Must Have Good Quality 578.00 110,976.00 96 Pc Soup Ladle. Type: Steel Type Body Shape: Circular Material: Stainless Steel, Highly Polished Appearance Over-all Length : 220 -235 Mm Ladle Bowl Details : 60 -65 Mm Long, 60 -75 Mm Diameter, 10 -15 Mm Deep Handle Details : 145 - 155 Mm Long X 12 - 25 Mm Wide X 1.5 -3 Mm Thick Color : Silver With Hang Hole For Hanging And Easy Access 355.00 34,080.00 384 Pc Soup Bowl. Type: Plain With Two Handles Body Shape: Circular Material : Porcelain Capacity : 24 Oz. (minimum) Packed In Carton Box The Item Must Have Good Quality Packed In A Carton Box 165.00 63,360.00 96 Pc Soup Tureen . Type: Steel Body Shape: Round Material: Stainless Steel Capacity: 7 - 11 Quart Size : 60 X 35 X 32 Cm (minimum) Packed In Plastic Pouch The Item Must Have Good Quality 2,955.00 283,680.00 384 Pc Spoon, Dessert. Type : Dessert Spoon Body Shape: Oval Material/appearance: Stainless Steel, Highly Polished With Plain Design Over-all Length : 175 To 190 Mm Thickness : 2 Mm - 3 Mm Shorter Handle : 120 -130 Mm Color : Silver. Packed In Plastic Pouch The Item Must Have Good Quality 85.00 32,640.00 192 Pc Spoons, Service. Type : Service Spoon Body Shape: Oval Material: Stainless Steel, Highly Polished, W/ Plain Design Over-all Length: 220 Mm - 250 Mm Width: 30 - 38 Mm Handle Thickness: 1.5 Mm - 4 Mm Handle Length - 165 Mm - 185 Mm Color: Silver. Packed In Plastic Pouch The Item Must Have Good Quality 78.00 14,976.00 384 Pc Spoons, Soup (cream And Consume). Type: Soup Spoon Body Shape: Round Material/appearance : Stainless Steel, Highly Polished, W/ Plain Design, Rounded Tip Handle Over-all Length : 165 Mm - 200 Mm Smaller Oval Shaped Spoon Bowl And Tapers Slightly To The Tip Shorter Handle : 110 Mm - 170 Mm Thickness : 1.5 Mm - 3 Mm Color : Silver. Packed In Plastic Pouch 65.00 24,960.00 384 Pc Knife, Steak. Type: Steak Knife Body Shape: Flat With Serrated Edge Material: Stainless Steel Blade With Wooden Handle Length: 170 Mm To 203 Mm Handle Wood Thickness: 10 - 14 Mm With Serrated Blade Packed In Carton Box The Item Must Have Good Quality 269.00 103,296.00 80 Pc Sugar Container. Type: Glass Type Body Shape: Round Material: Glass With Brass Lid (or Equivalent) Diameter: 70 -80 Mm Height: 130 -140 Mm Capacity: 12 Oz. Packed In Carton Box The Item Must Have Good Quality 250.00 20,000.00 128 Pc Table Cloth, 54 X 54 Inches. Type: Plain Cloth Body Shape: Square Material: Oxford Polyester Cloth Color: Plain White Dimension: L 54 Inches X W 54 Inches (minimum) Packed In Plastic Pouch The Item Must Have Good Quality 1,729.00 221,312.00 640 Pc Table Napkins, Cloth, 16 X 16. Type: Plain Cloth Body Shape: Square Material: Oxford Polyester Cloth Or Its Equivalent Size: L 16 Inches X W 16 Inches (minimum) Color: Plain White Packed In Plastic Pouch The Item Must Have Good Quality 225.00 144,000.00 128 Pc Table Skirting Cloth 90" X 90" . Type: Plain Cloth Body Shape: Square Material: American Cotton Twill Cloth Color: Any Color Except Black Dimension: 90 Inches X 90 Inches (minimum) Packed In Plastic Pouch The Item Must Have Good Quality 2,256.00 288,768.00 96 Pc Table, Square/rectangular (6's). Type: Foldable Plastic Body Shape: Square/rectangle Materia: High Density Polyethylene Table Top Powder Coated Steel Frame Dimension: 37 - 39 X 37 - 39 Inches Color: White Good For 6 Persons Packed In Carton Box The Item Must Have Good Quality 9,000.00 864,000.00 32 Pc Tea Pot, 2 Pints. Type: Porcelain Type Body Shape: Round With Handle And Pouring Spout Material : Porcelain Capacity : (2 Pint) Color : White Packed In Carton Box The Item Must Be Of Good Quality 1,040.00 33,280.00 384 Pc Teaspoon. Type : Tea Spoon Body Shape: Oval Tip Material/appearance: Stainless Steel, Highly Polished, W/ Plain Design Over-all Length: 120 Mm To 140 Mm Handle Thickness: 2 Mm To 4 Mm Short Handle Length - 100 Mm (minimum) Color: Silver Packed In Plastic Pouch The Item Must Have Good Quality 85.00 32,640.00 32 Pc Tong, 8 Inches. Type: Tong, 8 Inches Body Shape: Standard Material: Stainless Steel Size: 8 Inches Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Tongs Lock Closed For Storage Preferably With A Packing Case Food Grade And Dishwasher-safe. Must Be Branded 324.00 10,368.00 64 Pc Tooth Pick Holder. Type: Steel Type Body Shape: Round Material: Stainless Steel, Highly Polished In Appearance Diameter: 30 -35 Mm Diameter (minimum) Height: 65 -75 Mm Capacity: 1.24 Oz. (minimum) Packed In Plastic Pouch The Item Must Have Good Quality 265.00 16,960.00 64 Pc Tray Stand. Type: Foldable Body Shape: Rectangular Material: Chrome Plated Metal Folding Tray Stand Length: 470 -490 Mm Width: 400 -440 Mm Height: 770 -790 Mm Packed In Plastic Pouch The Item Must Have Good Quality 3,850.00 246,400.00 64 Pc Tray, Bill Folders/change. 1. Material : Heavy Duty Plastic ( Abs ) Or Its Equivalent 2. Height : 190 - 220 Mm 3. Width : 120 -140 Mm 4. Thickness : 2 Mm To 3 Mm (minimum) 5. Color : Black 6. With Check And Pen Holder 7. The Item Must Have Good Quality 8. Packed In Plastic Pouch 356.00 22,784.00 128 Pc Tray, Round (bar). Type: Plastic Body Shape: Round Material: ( Pe/abs) Plastic Rubberized Surface, Non-slip/grip Tight Over-all Diameter: 345 -360 Mm (minimum) Thickness: 2 - 4 Mm (minimum) Color: Black Packed In Plastic Pouch The Item Must Have Good Quality 426.00 54,528.00 384 Pc Water Goblet. Type: Water Goblet Body Shape: Balloon-shaped Bowl Material: Crystal Clear Glass Over-all Length: 200 -220 Mm Capacity: 270 Ml To 300 Ml Rim Diameter - 55 -65 Mm Thickness: 1 Mm To 3 Mm Stem Length : 75 -85 Mm Stem Diameter : 6 -8 Mm Base Thickness : 3 -4 Mm Base Diameter : 7 -80 Mm Packed In Carton Box 145.00 55,680.00 96 Pc Water Pitcher. Type: Steel Type Body Shape: Circular Material: Stainless Steel, Highly Polished Appearance Height: 170 Mm To 220 Mm Top Diameter: 110 -120 Mm (approximate) Capacity: 1 - 1.5 Liter With Pour Spout Dishwasher Safe Packed In Plastic Pouch The Item Must Have Good Quality 485.00 46,560.00 80 Pc Table, Working. Type: Working Table, Stainless Steel Body Shape: Rectangular Material: 304 Stainless Steel, 1.29 Mm Thick (gauge 16) Minimum Length: 1220 Mm (minimum) Width: 700 Mm (minimum) Height: 850 Mm (minimum) Tubular Stainless Steel Legs, 38mm (minimum) With 4 Adjustable Bullet Feet Fully Welded Construction Thickness: Gauge 16 (1.29 Mm Thick) Minimum Stainless Steel Table Top With Stainless Steel Undershelf Distance Between Table Top And Undershelf Is 650 Mm (minimum) Preferably With A Packing Case Or Crate No Sharp Edges And Rough Surfaces Must Be Branded 19,500.04 1,560,003.20 36 Pc Body Brush, Prosthetic. Material: Stiff Nylon Bristle Size: At Least 41.8 Cm X 6.5 Cm (over-all Size) Brush Height: 8mm(minimum) With Wooden Handle" 480.00 17,280.00 36 Pc Bowl, Mixing, Plastic. Material: Plastic Inner Diameter: 10.5 Cm (minimum) Height: 6cm (minimum) Thickness Is 2mm (minimum) Any Color Non-toxic 250.00 9,000.00 18 Pc Bowl, Shampoo. Bowl Material: Abs Plastic With Adjustable Stand(height: 39 Inches To 54 Inches ) Minimum Bowl Dimensions: 19 Inches(l) X 20 Inches(w) X 10 Inches(h); With Sealed Foam Rubber Neck Rest For Shampoo Bowls With Hose Attachment Of 7 Ft. Long(minimum) Stainless Steel Frame. Portable Type. Packed With Shipping Carton Box. Branded 4,000.00 72,000.00 36 Box Box, Hairpin. Material: Metal Size: At Least 3.5 X 4.5 X 0.5 Inches With Ball Tips Packaging: 100 Pcs Per Box Color: Black Non-corrosive 200.00 7,200.00 36 Pc Brush, Applicator. Material: Plastic Non-toxic Size: Small=190mm Length Medium=270mm Large=300mm Handle Width:70mm (minimum) Width Of Tip: 80mm (minimum) With Hair Coloring Dyeing Board Packed With Plastic Pouch 250.00 9,000.00 36 Pc Brush, Hair. Material: Plastic Bristle Paddle Brush Type Wooden Handle Minimum Width: 2 Inches Non-toxic Packed With Protective Carton Box 250.00 9,000.00 36 Pc Cap, Frosting, With Hook. Cap Material: Silicone Type: Reusable, Perforated Cap One Size Fits All Or At Least 31cm X 22cm With Pre-cut Tipping Guides With Bleed Proof Inner Liner With A Rounded Metal Hook To Pull Hair Through The Ready-made Perforations Packed With Plastic Pouch 350.00 12,600.00 36 Pc Cap, Heating. Waterproof Cloth Material. Cordless Type To Fit An Average Size Head (21-24 Inches) Stretch Up To 29 Inches Unisex Hair Care Treatment Styling Reversible And Reusable, Non-toxic Includes With User's Guide In English That Contains: A. Diagram Of The Parts With Their Names B. Operating Procedure On How To Use The Equipment C. Safety Precaution When Using The Equipment D. Basic Troubleshooting And Maintenance Procedure 400.00 14,400.00 36 Pc Cape. Polyester Cloth Size: At Least 125 Cm X 140 Cm Hairstyling Type Non-toxic Packed With Plastic Pouch 220.00 7,920.00 36 Pc Chair, High. Bar Stool Material: Metal, Painted With Anti-rust Width Of The Chair :15 Inches Minimum Height :33 Inches (minimum) Synthetic Leather Seat Material Barstool Crown Back Type With Rubber Ring Of Barstool For Anti-skidding 6,000.00 216,000.00 36 Pc Chair, Hydraulic. Material: Metal Base Size: Length59 Cm, Width54 Cm, Height From 51-78cm Hydraulic Pump Can Be Up And Down By Pedaling Load Capacity:180kg Hydraulic Styling Chair Type Heavy Duty Hydraulic Pump For Height Adjustable And 360' Rotation Hydraulic Pump Build In For Adjusting The Seating Height. With Footrest 8,000.00 288,000.00 36 Pc Clamp. Material: Plastic Overall Length: 9.5cm Thickness:10mm(minimum) Hairstyling Clamp Type 200.00 7,200.00 36 Box Clamp, Duck Bill. Material: Metal Length: 11 Cm (minimum) High Elasticity Stainless Steel Spring. Nonslip Handle Packed With Plastic Pouch Branded 200.00 7,200.00 18 Box Clipper, Hair. Body Material: Hard Plastic Blade Material: Carbon Steel Capacity:6 Watts (minimum) Complete With Blade Guard And 4 Comb Attachments (#1, #2, #3, #4) Motor: Magnetic Type, Corded,12v Ac/dc Adaptor Delivers 1,400 Strokes Per Minute, With Complete Accessories Including The Cleaning Brush With Cord 2 Meters Length Minimum With User's Manual In English Which Includes: A. Parts Manual With Labels, B. Assembly Instructions, C. Operating Procedures, Packed With Protective Carton Box. Branded 2,500.00 45,000.00 36 Pc Comb, Afro. Material: Plastic Size: Overall Length At Least 7 Inches Width: 3.25 Inches(minimum) Number Of Teeth: 12 Teeth (minimum); Teeth Height: 2.5 Inches Long (minimum) 200.00 7,200.00 36 Pc Comb, All Purpose. Material: Plastic Size#3 Or At Least 18 Cm Long (minimum) Has Both Fine And Medium Teeth Position On One Side Only Height Of The Teeth: 2 Cm (minimum) Non-toxic. Packed With Plastic Pouch 200.00 7,200.00 36 Pc Comb, Haircutting. Material: Hard Plastic Length Including The Handle:180mm (minimum) Width: 30mm (minimum) With Detachable Steel Blades And Blade Holder With Two Sides For Different Cuts With Extra Blades 200.00 7,200.00 36 Pc Comb, Large Toothed. Material: Plastic Size: At Least 15 Cm Number Of Teeth: 10 Teeth (minimum) Gap Between Comb's Teeth: 0.4 To 0.5 Cm Gap From One Another Teeth Size: At Least 0.3 Cm In Width X 4cm In Length Non-toxic. Packed With Plastic Pouch 200.00 7,200.00 36 Pc Comb, Tail. Material: Plastic Size : 8 Inches(l)minimum X 1 Inches (w) Minimum Tail Length: 4 Inches(minimum) Tooth Length: 3/4 Inch(minimum) Packed With Plastic Pouch 200.00 7,200.00 36 Pc Comb, Teasing. Material: Plastic With 2 Rows Of Teeth. 1st Row: Large Teeth With At Least 25 Mm Long 2nd Row: Small Teeth With At Least 19 Mm Long Over-all Comb Size: 20 Cm (l) Minimum X 3.8 Cm (w) Minimum. Non-toxic. Packed With Plastic Pouch 200.00 7,200.00 36 Pc Comb, Wide Tooth. Material: Plastic Size: At Least 15 Cm Number Of Teeth: 10 Teeth (minimum) Gap Between Comb's Teeth: 0.4 To 0.5 Cm Gap From One Another Teeth Size: At Least 0.3 Cm In Width X 4cm In Length 200.00 7,200.00 18 Box Crimpers. Power: 25 Watts(minimum) Size: At Least 38 Cm X 15.5 Cm X 9 Cm Maximum Temperature: 200 Degrees Centigrade With Variable Heat Setting. With On/off Switch Button Rated Voltage: 110 -230volts Ac With Power Cord With Plastic Handle 2,000.00 36,000.00 36 Pc Curling Iron. Ceramic Curling Iron Capacity: 65watts Voltage: 210-240volts Ac With Power Cord Barrel Size: 1 Inch (minimum) Adjustable Heat Setting With Maximum Temperature Of 200 Degrees, Centigrade Swivel Cord Up To 360 Degree 3,000.00 108,000.00 36 Pc Drip Pan. Material: Hard Plastic Size: At Least 17.5 X 25.8 X 1 Inches Thickness: 1/8 Inch (minimum) Shallow Rectangular Type Packed With Carton Box 220.00 7,920.00 36 Pc Dryer, Hair. Power: 1000w Rated Voltage: 220vac At Least (l X W X H): 18.5cm X 16cm X 6.5cm With Plastic Handle Design Packed With Carton Box With Styrofoam Holder With User's Manual In English 3,000.00 108,000.00 36 Box Gloves, Disposable. Material: Plastic Size: At Least 25cm X 23cm Packaging Is 100 Pcs Per Box 250.00 9,000.00 36 Box Gloves, Rubber. Size: Medium Thickness: 4 Mil Acid Resistant Packed With Plastic Pouch In Pairs. 250.00 9,000.00 36 Pc Gown, Smock. Material: Polyester Sizes: 1 Piece = Small Size, At Least (50 Inches X 56 Inches); 1 Piece= Medium Size, At Least (52 Inches X 58 Inches); 1 Piece= Large Size, At Least (54 Inches X 60 Inches); Packed With Plastic Pouch Per Size 250.00 9,000.00 36 Box Hairclips. Material: Metal Size: At Least 67mm X 19mm Non-corrosive Packed With Plastic Pouch 180.00 6,480.00 36 Pc Hairnet, Invisible. Material: Nylon Size: 55mm (minimum) Stretchable And Unisex Type Color: Black Non-toxic Packed With Plastic Pouch 180.00 6,480.00 36 Pc Headband. Size: 6 Inches (minimum) Woven Crochet Tube Top Headband Very Stretchy, Soft Material, Comfortable And Breathable 180.00 6,480.00 36 Pc Headband, Flannel. Flannel Cloth Size : At Least 45 Cm (unstretched Circumference) Width: 8 Cm (minimum) 180.00 6,480.00 36 Pc Infrared Iron. Material: Ionic Ceramic Tourmaline-infused Plates And Abs Plastic Body Power: 70 Watts (minimum) Power Rating: 220-240 Volts Ac; Over-all Size: 24 Cm Long (minimum) Heating Plate Size Up To 50 Mm Heating Time: Within 30 Seconds; Variable Heat Settings: From 250 To 450 Degrees Fahrenheit With Digital Temperature Control Safety Mode: Auto Shut Off After 60 Minutes; With Swivel Cord Comes With Storage Pouch. Branded 1,900.00 68,400.00 60 Pc Mirror, Hand. Mirror Size 15 Cm Diameter (minimum) Frame Thickness Including Mirror Glass: 6.5mm(minimum) Over-all Length With The Handle Is 20 Cm (minimum) Clear Mirror With No Distortion Frame And Handle Are Made Of Plastic Plane Mirror Type Packed With Carton Box With Styrofoam Protection 505.00 30,300.00 36 Pc Mirror, Modular. Mirror Type: Plain Mirror Mirror Material: Glass Frame Material: Aluminum (cut To Fit) Dimensions (hxw): 75 Cm X 65 Cm (minimum) Mirror Thickness: 6mm (minimum) 2,300.00 82,800.00 36 Pc Prong Clip, Double. Material: Steel Nickel Or Chrome Base Plated Size: 45 Mm Minimum Hairstyling Clip Type Packed With Plastic Handle 220.00 7,920.00 36 Pc Prong Clip, Single. Material: Steel, Plated Size: 55 Mm (minimum) Type: Single-prong Clip Packed With Plastic Pouch 220.00 7,920.00 36 Pc Razor, Straight. Blade Material: High Carbon Steel Type: Foldable Straight Razor, Replaceable Blade; Dimensions (lxw): 14 Cm X 2 Cm (minimum) When Folded; Compatible With Double-edged Razor Blades; Package Includes 10 Pieces Blade/box Non-corrosive. Branded 300.00 10,800.00 36 Pc Roller Pins. Material: Metal Size: 60mm Long (minimum) Application: Hair Roller Pins Quantity By Dozen(12 Pieces) Non Corrosive. Packed With Plastic Pouch 200.00 7,200.00 36 Pc Rollers, Jumbo. Material: Plastic Approximately 44mm In Diameter X 64mm Long 300.00 10,800.00 36 Pc Rollers, Large Sized. Material: Plastic Size: At Least 40mm Diameter X 60mm Long Hairstyling Type. Packed With Plastic Pouch 250.00 9,000.00 36 Pc Rollers, Medium Sized. Material: Plastic; Diameter: 38 Mm(minimum) Length: 58mm (minimum) Hairstyling Type. Packed With Plastic Pouch 200.00 7,200.00 36 Pc Scissors, Cutting. Material:stainless Steel Total Length: 17cm (minimum) Blade Width At Least 10 Cm. Non Corrosive Packed With Plastic Pouch. Branded 500.00 18,000.00 36 Pc Scissors, Thinning. Blade Material: High Carbon Steel Blade Length At Least 6cm With Straight Blade Type Style: Right Handed Scissor Total Length At Least 17cm One Side Comb Cutter, Non Corrosive Packed With Plastic Pouch. Branded 500.00 18,000.00 36 Pc Scoop. Material: Plastic Capacity:1/2 Cup (minimum) Rounded Edges With Handle Thickness: 1.5 Mm (minimum) 350.00 12,600.00 36 Pc Shower Cap. Material: Plastic Size: One Size Fits All Or 30cm Reusable And Waterproof Packed With Plastic Pouch 220.00 7,920.00 36 Pc Spatula. Material: Plastic Dimension: Over-all Length Of 7.5 Cm Long, X 1.5 Cm Wide (minimum) Application: Hair Waxing Removal Packed With Plastic Pouch 200.00 7,200.00 36 Pc Spray Gun. Material: Transparent Plastic Capacity: 300ml (minimum) Trigger Type Sprayer Dimension: At Least Diameter Of Bottom Is 7 Cm And The Height Is 17cm 220.00 7,920.00 36 Pc Steamer, Hair. Power 450 Watts (minimum) Rating Is 220 Volts/50-60hz Hood Material: Polycarbonate Hood Has At Least 30 Cm Diameter Opening X 25 Cm Deep Timer Setting Is Up To 60 Minutes With At Least 32 Ounce Water Reservoir Adjustable Height From 100 To 150cm With At Least 5 Swivel Caster With User's Manual In English Which Includes: A. Parts Manual With Labels, B. Assembly Instructions, C. Operating Procedures. Branded 6,500.00 234,000.00 36 Pc Stool. Material: Metal, Electroplated Load Capacity: 150kg Design: Swivel Stool With Backrest With Hydraulic Lift To Adjust Height Freely. With Thick Sponge Cushion. With At Least Four Caster Wheels. With Thick Sponge Cushion. Swivel Stool With Backrest No Sharp Edges. Branded 8,500.00 306,000.00 21 Pc Dummy, Anatomical. 1. Half Life-size Muscular Figure Measures 32" Tall (minimum). 2. This Model Features 27 Removable Parts That Are Held On By Metal Screws, Posts, And Hooks. 3. It Shows The Muscular System With Numbered Parts That Comes With A Corresponding Key. 4. It Has Removable Arms, A Removable Calvarium, And A Removable Chest Plate That Hides The Individual Numbered Organs Of The Digestive System 5. Detachable Muscles Include: Deltoid, Brachioradialis With Extensor Carpi Radialis Longus And Brevis, Biceps Brachii, Pronator Teres With Palmaris Longus And Flexor Carpi Radialis, Sartorius Muscle, Rectus Femoris, Extensor Digitorum Longus, Tensor Faciae Latae, Gluteus Maximus, Biceps Femoris, Semitendinosus, Gastrocnemius, Soleus. 6. Removable Organs Include: Brain (2parts), Lungs (2 Parts), Heart (2 Parts, Liver, Intestines, Stomach 7. Base Is 13" X 9" (removable) 8. Weighs 12 Lbs. (approximately) 9. Plastic Material 10. Non-toxic Material 11. Carton Box Packaging 6,000.00 126,000.00 35 Pc Massage Bed / Table. Materials: Hard Wood With Steel Bracings, Hardwood Frame, Marine Plywood Deck; Color: Black Dimensions: W:75 Cm X L:183 Cm X H: (adjustable) Height: Adjustable From 24 In. - 33in. Leg Thickness - 35mm (minimum) Cushion System: High Density Foam (7.5 Cm / 2.95") Minimum With Pu Leather Cover (1mm Thick) Finishing: Round Corner Weight Capacity: 250 Kg(minimum) Gross Weight: 21 Kg (approximate) 2 End Support Bearer To Strengthen The Base And Increase Weight Capacity Accessories - Aluminum Headrest (adjustable) + Face Plug + Armrest + Arm Sling + Carry Case. Portable And Foldable 15,000.00 525,000.00 35 Pc Massage Chair. Ii 1. Padded With 3" Thick, High-density, Small-cell Foam 2. Size: 14"-diameter Seat (minimum) But Without Back And Arm Rest, With Metal Post And Hard Plastic Star. 3. Pneumatic Spring Will Effortlessly Adjust The Height From 18" To 24" With The Pull Of A Lever 4. Five Heavy-duty, Smooth-rolling Wheels 5. Load Capacity: 265 Lbs / 120 Kg (maximum) 6. Smooth Surface And No Sharp Edges 7. Any Color With One Color Only For Whole Lot 5,000.00 175,000.00 35 Pc Sphygmomanometer. Aneroid Type; (for Adult Use) Large Cuff Sizes: 33 To 42 Cm Arm Diameters Accuracy: ±3mm Hg; Measurement Range : 0mm Hg To 300mm Hg; Smallest Scale: 1mm Hg Index And Range Markings On The Dial For Clear Readings Nylon Cuff Is Durable And Stain Resistant With A Velcro Closure Inflation System Is Latex Free And Has An Easy-release Deflation Valve Chrome-plated Brass Air Release Valve; Set Includes: 1 Unit Sphygmomanometer; 1 Zippered Nylon Carrying Case Smooth Surface And Edges, Non-toxic Material 2,500.00 87,500.00 35 Pc Stethoscope. Chest-piece Description: Stainless Steel Double Chest Piece Color: Black Tubing Description: Y-tube Pvc Uses Extra Soft Replaceable And Pivotable Ear Tips The Binaural Is Chromium-plated Chest-piece Diameter: 44 Mm (minimum) And Has Non-chill Rim Overall Length: 29" /74 Cm (minimum) The Stethoscope Is Latex-free Comes With A Pair Of Replacement Ear Tips, A Replacement Membrane, And A Name Plate Smooth Surface And No Sharp Edges 6,829.20 239,022.00 21 Pc Talking Sphygmomanometer. Type: Arm Type Blood Pressure Monitor (talking English), Nylon Cuff Sizes: 33 To 42 Cm Arm Dia. Lcd Digital Display: Systolic, Diastolic, Pulse Rate With Real Voice, Loud And Clear, Announcing Blood Pressure Automatically When Reading Is Detected And Displayed Simultaneously Dimensions: 98mm*126mm*60mm (approximate) Hard Plastic Casing, Smooth Surface And No Sharp Edges, Non-toxic Materials Measurement Range : 0mm Hg To 300mm Hg; Smallest Scale: 1mm Hg Weight: 450g (approximate) Pressure Measurement Range: 20~280mmhg(0.4kpa-37.3kpa) Pressure Accuracy: ±3mmhg(±0.4kpa) Pulse Measurement Range: 40 ~199 Beats /min Voltage: 4*aaa Alkaline Batteries Or Power Adapter Certificate: Ce Rohs Intelligent Automatic Pressurization And Decompression Incorrect Prompting Function Automatic Shutdown: 1 Min After Last Operation Carton Box Packaging 3,500.00 73,500.00 21 Pc Talking Thermometer. Case Material: Hard Plastic Sensing Unit: Thermistor Measurement Method: Actual Measurement Measurement Range: 32 C - 42 C (89.6f-107.6f) Measurement Accuracy: ± 0.1c 32c-42.0c (± 0.2 F 89.6.9f-107.6f) Power Supply: 1.5v Dc, Lr41 Alkaline-magnesium Button Battery Real Voice (loud And Clear In English) Announces Temperature Automatically When Reading Is Detected Temperature Display: 3-digit, +deg C (deg F) Display In 0.1 Degree Increment Dimension Approx.: 2.0 (w) X 4.4 (h) X 1.2 (d) Inches (not Including Probe) / 51 (w) X 110 (h) X 30 (d) Mms (not Including Probe) Choices In Degrees Celsius Or Fahrenheit Talk Button Repeats Last Temperature Reading Last Reading Memory Auto Switch Off Accessories: Protective Case, 5 Probe Covers, Instruction Sheet Paddle Shape With Sensor On Small End 2,599.00 54,579.00 35 Pc Thermometer, Digital. Case Material: Hard Plastic Sensing Unit: Thermistor Measurement Method: Actual Measurement Measurement Range: 32 C - 42 C (89.6f-107.6f) Measurement Accuracy: ± 0.1c 32c-42.0c (± 0.2 F 89.6.9f-107.6f) Power Supply: 1.5v Dc, 1 Lr41 Alkaline-magnesium Button Battery When Measured At A Standard Room Temperature Of 23 Deg C (73.4 Deg F) In A Test Tank Held At Constant Temperature Power Consumption: 0.1mw Low Battery Indication: Battery Symbol Displayed Temperature Display: 3-digit, +deg C (deg F) Display In 0.1 Degree Increment Memory: Last Measuring Reading Beeper Function: 1 Beep When Power On 3 Beeps After Measurement Completed External Size (mm): 19.4(w) × 132.5 (l) × 10.0(d) Accessories: Protective Case, Test Battery, 5 Probe Covers, Instruction Sheet Paddle Shape With Sensor On Small End 2,599.00 90,965.00 21 Pc White Board. White Board, Floor Standing, Rolling Board: White Formica Laminated, Plane Will Not Deform. Board Size: Rectangular 1800mm W X 1000 To 1200mm H, Board Edges Secured With Aluminum Clip Edging 17 Mm (minimum) With Plastic Corner Caps Comes With Metal Tray For Marker And Eraser The Stand And Frame Are Constructed With Aluminum Or Powder Coated Steel 25mm Square Tube (minimum), Sturdy, No Wobble With 4 Lockable Hard Plastic Caster Wheels Overall Height From Floor: 210 To 214cm Smooth Surface, No Sharp Edges 800.00 16,800.00 30 Set Allen, Wrench. 1. Material: Chrome Vanadium Steel, Hrc 38 To 60; 2. Set Of 10 Pieces: 1.5 Mm, 2 Mm, 2.5 Mm, 3 Mm, 4 Mm, 5 Mm, 5.5 Mm, 6 Mm, 8 Mm, 10 Mm; 3. With Holder/ring To Keep The Set Intact; 4. Label Of Sizes Engraved In Each Allen Wrench; 5. Smooth Surfaces And No Sharp Edges 6. Plastic Pack By Set 550.00 16,500.00 30 Pc Anti-static Device (anti-static Wrist Strap). Consists Of: A) Adjustable And Elastic Wristband With Integrated 1 Mega Ohm Resistor, B) Banana Plug With Alligator Clip For Connecting To Ground (or Equivalent), C) At Least 59" Long Coiled Cord; D) Non Toxic Material E) Carton Box Or Plastic Pouch Packaging 1,200.00 36,000.00 60 Pc Combination Pliers, 8". Type: Combination Pliers; Body Shape: Square Nose Material: Chrome Vanadium/forged Steel Length: 9 Inches (minimum) Insulation Range: 1000 Volts (etched On The Handle) Design: Square Nose With Serrated Jaw Comes With Nickel Plated Finish, Side Cutter And Insulated Handle Must Be Branded (brand Must Etched Either In The Head Or On The Handle) 550.00 33,000.00 60 Pc Crimping Tool (rj 11/45). 1. Ratchet Crimp Tool 2. All-in-one Tool That Can Strip, Cut, And Crimp 3. Lightweight Steel Frame 4. Rj-11/45 Compatible 5. Positions For 8p/8c, 6p/6c And 4c Connectors 6. Lightweight, Compact, And Durable 7. Smooth Surface And No Sharp Edges Except Cutting Edges 8. Carton Box Packaging 658.00 39,480.00 18 Pc Desoldering Pump. 1. Material : Plastic Or Aluminum Housing; 2. Replaceable Heat-resistant Plastic Tip; 3. Length : Minimum Of 6 Inches; 4. Effective In Removing Solder; 5. Smooth Surface And No Sharp Edges 6. Carton Or Plastic Packaging 3,000.00 54,000.00 12 Pc Electric Drill, Portable. Type: Electric Power Material: Hard Plastic Rated Voltage: 220 / 240 Volts, Ac 60 Hz Power In Watts: 550 To 650 Watts Speed: Variable Speed Chuck Capacity: 2 To 13 Mm Power Cord Must Have Flat Blade Attachment Plug (type A Plug) Comes With Hss Drill Bits: 2mm 4pcs. 4 Mm 4pcs. 6 Mm 4pcs. 8 Mm 4pcs. 10 Mm 4pcs.12 Mm 4pcs. 12.5 Mm 4pcs. Total- (28 Pcs) Masonry Drill Bits; 4 Mm 2pcs. 6 Mm 2pcs.8 Mm 2pcs. 10 Mm 2pcs. 12 Mm 2pcs. Total- ( 10 Pcs.) With Hammer Function For Concrete Drilling Comes With English User's Manual Includes Of The Following: A. A Diagram Of The Parts With Label; B. Assembly Instructions; C. Operating Procedures; D. Safety Precautions When Using The Equipment; E. Basic Troubleshooting And Maintenance Procedures. Warranty Period Of Parts And Service: 1 Year 4,500.00 54,000.00 12 Pc External Optical Drive. 1. Interface: Usb 3.0 Or Better; 2. Compatibility: Windows 2000, Xp, Vista, 7, 8, 10, Apple Mac, Linux Or Better; 3. Read Speed: At Least 8x Dvd, At Least 24x Cd; 4. Write Speed: At Least 4x Dvd, At Least 16x Cd; 5. Package Includes: A) 1 X External Optical Drive, B) 1 X Usb Power Cable, C) 1 X Usb Data Cable, 6. Item Size: 5.4"x 5.51"x0.63"(l X W X H) Approximate 7. Metal Or Hard Plastic Casing 8. Smooth Surface And No Sharp Edges 9. Carton Box Packaging 10. With User's Manual In English Which Includes: A. A Diagram Of The Parts With Their Names, B. Operating Procedures 11. With Service Centers Located In Major Cities In The Philippines. 2,000.00 24,000.00 60 Pc Flash Drive. 1. Capacity: 64 Gb ; 2. Connectivity: Usb 3.0, Backward-compatible With Usb 2.0, Plug And Play ; 3. Device/os Compatibility: Windows Vista, Windows 7, 8, 10, Mac Os 10.6+ Or Later Versions; 4. Form: Swivel Type Or With Cover; 5. Dimension: 0.40 X 0.80 X 2.31 In. (10.16 X 20.32 X 58.67 Mm) Approximate 6. Metal Or Hard Plastic Casing 7. Smooth Surface And No Sharp Edges 8. Carton And/or Plastic Packaging 9. User's Guide On Name Of Parts, Connection Guide, Maintenance And Safety Precautions. 800.00 48,000.00 60 Pc Flashlight, Head-mounted. 1. Type: Rechargeable, Head Mounted Led Flashlight; 2. Minimum Of 160 Lumens; 3. Beam Distance: Minimum Of 150 Meters; 4. Includes 220 V Ac Charger/power Adaptor (or Equivalent); 5. Charging Time: 3-6 Hours; 6. Provides Up To 30 Hours (minimum) Of Constant Light On A Single Full Charge; 7. Approximate Size: 60x 30mm 8. Smooth Surface And No Sharp Edges 9. Carton Box Or Plastic Pouch Packaging. 10. With User's Manual In English 450.00 27,000.00 60 Pc Hub/switch. 1. Standards And Protocols: Ieee 802.3, Ieee802.3u, Ieee802.3x Csma/cd 2. Interface: 8 10/100mbps Ports, Auto-negotiation, Auto-mdi/mdix 3. External Power Supply Adapter: 100 240vac,50/60hz 4. Fanless 5. Data Rates: 10/100mbps At Half Duplex ; 20/200mbps At Full Duplex 6.led Indicator: Power, 1, 2, 3, 4, 5, 6, 7, 8 7.dimensions: 5.3 X 3.1 X 0.9 In. (134.5 X 79 X 22.5mm) (approx.) 8. Transfer Method: Store And Forward 9. Advance Functions: Green Technolgy, Saving Power Up To 73%; 802.3x Flow Control, Back Pressure; Auto-uplink Every Port 10. Certification: Fcc, Ce, Rohs 6,790.00 407,400.00 30 Pc Lan Cable Tester. 1 Cable Tester With Led Indication For Rj12, Rj11, Rj45, Cat5e, Cat5, 10/100 Base - T. 2 Main Tester: 1-2-3-4-5-6-7-8-g; 3 Remote Tester: 1-4-3-2-5-6-7-8-g; 4 Power Supply: 9 V Battery (included); 5 Capable Of Testing Crossover, Straight-through, And Rollover Cables; 6 Includes Plastic Case Or Pouch; 7 With User's Manual In English 4,500.00 135,000.00 60 Pc Long Nose Pliers, 8". 1 Material: Chrome Vanadium Steel, Hrc 38 To 60; 2 Length: 7 Inches (minimum); 3 Handle Type: Curved Handle With Rubber Cushion For Easy Grip; 4 Jaws Type: Knurled And Long Tempered; 5 Comes With Hardened Cutting Edges And Chrome-nickel Finish. 6. Smooth Surface And No Sharp Edges 7. Carton Or Plastic Packaging 550.00 33,000.00 60 Pc Multimeter, Digital. Material: Plastic Casing Main Functions: Auto Range/data Hold/back Light/ Led Lamp/diode Test/triode Test/continuity/ Over Load Protection/low Battery Indication/auto Power Off/short-circuit Protection. Display: True Rms, 6000 Counts, 3 5/6 Digits Overload Display: Display Ol Dc Voltage:600mv/6v/60v/600v(0.5%+3), 1000v (0.5%+3) Ac Voltage:600mv/6v/60v/600v/750v (0.8%+5) Dc Current:600a/6000a/60ma/600ma/10a (1.2%+3) Ac Current:600a/6000a/60ma/600ma/10a (1.5%+3) Resistance:600/6k/60k/600k/(1.0%+3) ,6m/60m (1.5%+3) Capacitance: 10nf/100nf/1000nf/10uf/100uf/1000uf (4.0%+5), 10mf/100mf(5.0%+5) 1,000.00 60,000.00 120 Pc Patch Panel (48 Ports). 1. Network Patch Panel 2. 48 Port Patch Panel 3. Cat6 Cable 4. Material: Abs Plastic 5. Application: Utp(unshielded) 6. Certification: Rohs, Iso, Ce 7. Rj45 Connector : Two Rows (1-24 Ports & 25-48 Ports) 8. Transport Package: 1pcs/box 9. Smooth Surface And No Sharp Edges 6,950.00 834,000.00 6 Pc Pc Video Camera. 1) 5.0 Mega Pixel Web Camera, Usb-type; 2) With Microphone For Laptop And Desktop Pc Use; 3) Resolution: At Least 640 X 480; 4) Support Windows Xp/7/8/equivalent Mac Os Or Later Versions; 5) With User's Manual In English Which Includes: A) A Diagram Of The Parts With Their Names, B) Operating Procedures C) Basic Troubleshooting And Maintenance Procedures. 6) Hard Plastic Or Metal Casing 7) Smooth Surface And No Sharp Edges 7,000.00 42,000.00 30 Pc Philip's Screwdriver, 8" Insulated. 1. Shank Material: Chrome Vanadium Steel, Hrc 38 To 60; 2. Handle Material: Molded Plastic 3. Overall Length: 8 Inches (minimum) 4. Insulation Protection (including Shank): 1000vac/ 1500vdc, Vde Certified (or Its Equivalent) 5.non Slip Handle Design 6. Carton Or Plastic Packaging 400.00 12,000.00 30 Pc Precision Screwdriver, 8" Insulated. 1. Material: Hardened And Tempered Steel; 2. 1 Set Comes With The Following: A) 3 X Phillips Tip No. 00, 0, And 1 ; B) 6 X Standard Tip No. 1, 1.2, 1.4, 1.8, 2.4, And 3.0; C) 1 X Awl; D) 1 X Magnet; E) Plastic Storage Case; 3. Non Slip Design Handle 400.00 12,000.00 30 Pc Soldering Iron, 60w. 1. Type: Iron Rod 2. Voltage: 220/240vac, 60hz, Single Phase; 3. Power: 60w (minimum); 4. Body Length: 8.3 Inches (21 Cm) Approximate 5. Cord Length: 1.5 Meters (minimum) 6. Handle: Plastic; (non Slip Handle) 7. With User's Manual Written In English That Contains User's Guide, Operating Procedure, Parts With Description, Safety Procedure, And Maintenance; 8. Interchangeable Copper Tip; 9. Should Have Available Spare Parts Nationwide For A Minimum Period Of 5 Years; 10. Carton And/or Plastic Packaging 1,670.00 50,100.00 30 Pc Standard Screwdriver (flat), 8" Insulated. 1. Shank Material: Chrome Vanadium Steel, Hrc 38 To 60; 2. Handle Material: Molded Plastic 3. Overall Length: 8 Inches (minimum) 4. Insulation Protection (including Shank): 1000v, Vde Certified (or Its Equivalent) 5.non Slip Handle Design 6. Carton Or Plastic Packaging 550.00 16,500.00 30 Pc Uninterruptible Power Supply (ups). The Item Shall Have The Following Specifications: 1. Type: Battery (included): Lithium-ion Battery Or Maintenance-free Sealed Lead-acid Battery With Suspended Electrolyte: Leakproof 2. Voltage: Nominal Input Voltage: 230v, 50/60 Hz 3. Output Power Capacity: 600va (minimum) 4. Output Connections :2 Universal Receptacle (minimum) 5. Cord Length: 1 Meter (minimum) 8,000.00 240,000.00 6 Pc Usb External Hd. 1) 1tb Portable/external Hard Drive 2) Application: Laptop / Desktop Pc 3) Interface Type: Sataii 4) Installation: Mobile 5) Formatted Capacity: 1000gb(windows Display About 298gb) 6) Size(mm): 14.29 X 80.01 X 17.60 (approx.) 7) Metal Casing 2,500.00 15,000.00 30 Pc Wire Stripper. Type: Spring-loaded Self-opening; Body Shape: Long Jaw With Slot Blade Material: Hardened Alloy Steel (sharp Edges To Strip And Cut The Wires) Wires To Be Stripped: 10 Awg To 24 Awg Length: 7 Inches (minimum) Comes With Automatic Self- Adjusting Spring, Crimping Slot, And Hard 275.00 8,250.00 60 Pc Wireless Access Point. Type: Wireless Access Point Dual Band Wifi Band / Data Transfer Rate: 867 Mbps At 5 Ghz And 300 Mbps At 2.4 Ghz Band Operating Modes: Access Point (ap), Bridge, Wireless Client, Repeater Interface: One 10/100m Ethernet Port(rj45), Support Passive Poe Power On/off Button And Reset Button Comes With External Power Supply: 5vdc-12vdc / 0.5a-1.0a Dimensions ( L X W X D ): (76-191 ×47-125 ×30-68mm) 3,489.60 209,376.00 Total 22,623,009.00 2. The Department Of Education, Schools Division Office Of Albay Now Invites Bids For The Above-cited Procurement Opportunity. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders In The Amount Of Php 25,000.00 Pursuant To The Latest Guidelines Issued By The Gppb. Delivery Of The Goods Is Thirty (30) Calendar Days From The Date Of The Ntp. Delivery Should Be At The Designated Schools (door-to-door Delivery). Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Interested Bidders May Obtain Further Information From Department Of Education, Schools Division Office Of Albay, Bids And Awards Committee Office, And Inspect The Bidding Documents At The Address Given Below From Monday To Friday During Office Hours (8:00 Am To 5:00 Pm). 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 13 To December 3, 2024; 9:00 Am From The Address Below And Upon Payment Of Php 25,000.00 As The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity (www.depedalbay.com) Starting November 13, 2024 Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Department Of Education, Schools Division Office Of Albay Will Hold A Pre-bid Conference On November 20, 2024; 9:00 Am At 2f Lobby, Deped Sdo Albay, Ligñon Hill, Bogtong, Legazpi City, Which Shall Be Opened To Qualified Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before December 3, 2024; 9:00 Am. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb. Bid Opening Shall Be On December 3, 2024; 9:00 Am At 2f Lobby, Deped Sdo Albay, Ligñon Hill, Bogtong, Legazpi City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 8. Prospective Bidders Are Strongly Encouraged To Order Or Download The Electronic Copy Of The Bidding Documents From The Philgeps Website, For Them To Be Included In The Document Request List Of The Project. The Bidding Documents May Be Viewed Also At The Deped Sdo Albay Schools Division Office Website: Www.depedalbay.com. 9. The Department Of Education, Schools Division Office Of Albay Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. For Further Information, Please Refer To: Jade O. Alberto Education Program Supervisor Bac Secretariat Head-designate Office Of The Bids And Awards Committee 2nd Floor, Deped Sdo Albay, Ligñon Hill, Bogtong, Legazpi City Tel.no.: 052-204-8535 11. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.depedalbay.com November 12, 2024 (sgd.) Bernie C. Despabiladero, Edd Assistant Schools Division Superintendent Bac Chairperson For Goods And Consulting Services
Closing Soon3 Dec 2024
Tender AmountPHP 22.6 Million (USD 383 K)
Department Of Labor And Employment Tender
Publishing and Printing
Philippines
Details: Description Lot A 23 Box Clearbook, A4 Size (piece)refillable, Material: Plastic, Cover: Opaque Plastic, Dimension: 310mm X 235mm (min.), Thickness: 0.5mm (min.), Pocket: Transparent Plastic, Number Of Pockets: Twenty (20), Thickness: 0.04 Mm (min.), Color: Assorted ( Black, Blue, Red, Yellow) 23 Box Clearbook, Legal Size (piece) Refillable, Material: Plastic, Cover: Opaque Plastic, Dimension: 345mm X 235mm (min.), Thickness: 0.04mm (min.), Color: Assorted ( Black, Blue, Red, Yellow) 30 Piece Eraser, Plastic/rubber (piece) Rectangular, Dimension (l X W X T) (min.): Equivalent Volume Of 8,350mm3 422 Piece Sign Pen, Extra Fine Tip, Black (piece) Ink Color: Black, Type: Liquid Or Gel, Tip: 0.5mm, Needle Type, One (1) Piece Barrel (non-refillable), Writing Length: One (1) Km (min) 172 Piece Sign Pen, Fine Tip, Black 182 Piece Sign Pen, Medium Tip, Black (piece) , Black (piece) Ink Color: Black, Type: Liquid Or Gel, Tip: 0.7mm, Needle Type, One (1) Piece Barrel (non-refillable), Writing Length: One (1) Km (min) 43 piece Sign Pen, Medium Tip, Blue(piece) , Blue(piece) Ink Color: Blue, Type: Liquid Or Gel, Tip: 0.7mm, Needle Type, One (1) Piece Barrel (non-refillable), Writing Length: One (1) Km (min) 1 pack "wrapping Paper, Kraft, Weight: 65gsm (-5%), Size: Width: 914.4mm (36"") (-3mm), Length: 1,219.4mm (48"") (-3mm)" 25 pack Battery, Dry Cell, Size Aa (pack) 1.5 Volts, Alkaline, Minimum Of Thirty (30) Minutes Runtime With A Current Draw Of 1.0 Amp Until Cut-off At One (1) Volt 19 pack Battery, Dry Cell, Size Aaa (pack)1.5 Volts, Alkaline, Minimum Of Thirty (30 Min.) Runtime With A Current Draw Of 0.5 Amp Until Cut-off At One (1) Volt, Shelf Life: Five (5) Years (min) From Date Of Acceptance 19 Bottle Ink, For Stamp Pad (bottle) Volume (min): 50ml, With Applicator, Shall Conform With The Required Perfamnce Test: Dry Time, Stability Test, Resistance To Water, Effect On Rubber Stamp, Corrosion Of Stamp-pad Container 2 Unit Digital Voice Recorder, Built-in Memory: 4gb (expandable), Channel: Stereo, Recording & Playback Format: Mp3, Wma, Earphone Jack, Built-in Microphone, Usb Connectivity, Battery Life 20 Hours (min) (recording Mode, Mp3 128kbps 2 Unit Fire Extinguisher, Dry Chemical, Capacity In Terms Of Mass Of Extinguisher Medium: 4.5kg (10lbs), Purity Of The Chemical: 75% (min.), Duration Of Discharge: 10 Seconds (min.) 5 Piece Philippine National Flag (piece) Type: 1, Size: Length: 1,828.8mm (6') (-3mm), Width: 914.4mm (3') (-3mm), Material: 100% Polyester, With Certificate Of Accreditation From National Historical Commission Of The Philippines (nhcp) 4 Unit "external Hard Drive (unit) Capacity: 1tb, Weight: 181 G - 205 G, Storage Media: 2.5""sata Hdd, Rotational Speed: 5400 Rpm, System Requirements: 1. Ms Windows 7, Ms Windows 8, Ms Windows 10, Mac Os 10.7 Or Later, Linux Kernel 2.6.31 Or Later, Antivirus: Pre-installed Antivirus (optional), Accessories: With Usb 3.0 Cable And Product Manual In English" 17 Piece Flash Drive (piece) 64gb Capacity 7 Unit Computer Mouse, Wireless (unit)connection Type: Usb, Tracking Method: Optical, Resolution: 1,000 Dpi (min), High-definition Optical: 2.5x More Responsive Than Standard Optical Mouse, 1000dpi High Technology Delivers Smoother, More Accurate Cursor Control 15 Piece Light-emitting Diode (led) Light Bulb, 7 Watts, Power Consumption: 7 Watts (max), Color Temperature: 6,500 Kelvin, Lumen Output: Not Less Than 530 Lumens, Frequency Rating: 60hz, Color Rendering Index: 80 +/-10%, Input Voltage: 220-240 Volts, Ac, Socket Base: E27, Light Color: Cool Daylight, Power Factor: Not Less Than 0.90, Average Life: Not Less Than 15,000 Hours, Operating Temperature: ≥ 35°c 73 jar Glue, All-purpose (bottle) Gross Weight (min.): 200 Grams, Free Formaldehyde(max.): 0.1%, Adhesive Strength - No Slippage On Pasted Part, Solid Content (min.): 30%, Ph: 4 To 8,container: Plastic Jar, Cap: Plastic Non-stick Easy Open Twist Top, With Tapered Applicator Attached To The Cap 42 box Staple Wire, Heavy Duty (binder Type), 23/13, Type: Chisel Point, Thickness: 0.60mm (-0.05), Width: 13mm (0.20), Leg Length: 13mm (-0.30), Number Of Staples Per Strip:100, Number Of Staples Per Box: 1,000, Binding Capacity: 40-90 Sheets Of 70gsm Multi-purpose Paper 201 box Staple Wire, Standard (box) 5000 Wires Per Box, Dimensions, In Mm: (see Fig. 1), Width (w): 12.70 +0.15mm/-0.20mm, Leg Length (l): 6.00 +0.50mm/-0.20mm, Thickness (d): 0.40 + 0.05mm, Width (e): 0.50 + 0.05mm, Number Of Wires Per Strip: 100 (min) 12 roll Tape, Electrical, Made Of Polyvinyl Chloride (pvc), Width: 18mm (min.), Length: 16 Meters (min.), Assorted Colors 36 roll Tape, Masking, 24mm (roll)width: 24mm (+1mm), Usable Length: 50 Meters, Adhesion Strength: 8.5n/24mm Width (min), Breaking Strength: 65n/24mm Width (min) 68 roll Tape, Masking, 48 Mm (roll) Width: 48mm (+1mm), Usable Length: 50 Meters, Adhesion Strength: 8.5/24mm Width (min), Breaking Strength: 65n/24mm Width (min) 70 roll Tape, Packaging, 48 Mm (roll) Color: Tan, Width: 48mm (+1mm), Usable Length: 50 Meters, Base Material: Biaxially-oriented Polypropylene, Adhesion Strength: 6n/24mm (min), Breaking Strength: 14n/24mm (min) 52 roll Tape, Transparent, 24mm (roll) Width: 24mm (+1mm), Usable Length: 50 Meters, Base Material: Biaxially-oriented Polypropylene, Adhesion Strength: 6n/24mm (min), Breaking Strength: 14n/24mm (min) 69 roll Tape, Transparent, 48 Mm (roll) Width: 48mm (+1mm), Usable Length: 50 Meters, Base Material: Biaxially-oriented Polypropylene, Adhesion Strength: 6n/24mm (min), Breaking Strength: 14n/24mm (min) 11 roll Twine, Plastic (roll) Weight Per Roll (min.): 1000g, Breaking Strength(min.): 25kg 20 piece Ruler, Plastic, 450mm (piece) Transparent/clear, Ruler Scale: Millimeters, Centimeters, Inches, Clear And Sharp Ruler Scales, Width: 38mm (min), Thickness: 1.30mm (min) 14 unit Calculator, Compact (unit) Width: 100mm - 130mm, Lcd Display, Capacity: 12 Digits, Two Way Power Source (solar And Cell) 10 boc Clip, Backfold, 15mm 87 box Clip, Backfold, 19mm (box) All Metal, Clamping Length: 19mm (-1mm), Clamping Depth: 10mm (min.), Thickness Of Metal: 0.20mm (min.), Diameter Of Clip Handles: 1.0mm (min.) 94 box Clip, Backfold, 25mm (box) All Metal, Clamping Length: 25mm (-1mm), Clamping Depth: 13mm (min.), Thickness Of Metal: 0.22mm (min.), Diameter Of Clip Handles: 1.20mm (min.) 36 box Clip, Backfold, 32mm (box) All Metal, Clamping Length: 32mm (-1mm), Clamping Depth: 14mm (-1mm) Thickness Of Metal: 0.30mm (min.), Diameter Of Clip Handles: 1.45mm (min.) 26 box Clip, Backfold, 50mm (box) All Metal, Clamping Length: 50mm (-1mm), Clamping Depth: 25mm (-1mm), Thickness Of Metal: 0.33mm (min.), Diameter Of Clip Handles: 1.85mm (min.) 252 piece Correction Tape (piece) Disposable, Dispensing Mechanism: Gear Type, Dispensing System: Single Line Tape 21 piece Cutter/utility Knife, For General Purpose (piece) Length: 100mm (+2mm), Width: 16mm (+2mm) Thickness: 0.40mm (+0.02mm) 85 piece Data File Box (piece) Outside Dimension: Width: 125mm (min), Height: 230mm (min), Length: 400mm (min), Material: Chipboard: 3mm Thick (min) 53 piece Data Folder (piece) Dimension: Width: 75mm (min), Height: 230mm (min), Length 380mm (min), Material: Chipboard: 2,5mm Thick (min) 11 piece Dater Stamp (piece) With Locking Mechanism, With Self-inking Stamp, With Removable And Refillable Ink Pad, Single Color, Size Of Imprint: 30mm X 45mm (min) 9 box Envelope, Documentary, A4 (box) 14 box Envelope, Documentary, Legal, (box) Size: 254mm X 381mm (-2mm), Basis Weight: 150gsm (-5%), Thickness (min.): 0.22mm 12 box Envelope, Expanding, Kraft (box) Legal Size: 380mm X 250mm (-3mm), Expansion: 50mm (-3mm), Thickness (min.): 0.38mm 4 box Envelope, Expanding, Plastic (box) 10 box Envelope, Mailing (box) 13 piece Eraser, Felt, For Blackboard/whiteboard (piece) Overall Size (l X W X T) (min.): 125mm X 45mm X 19mm 30 box Fastener, Metal (box) Thickness: Base With Prongs And Compressor: 0.30mm (min.), Material: As Per Sample Provided, Able To Hold 25mm Thick Of Multipurpose Paper (70gsm), 70mm Between Prongs 43 piece File Organizer, Expanding, Plastic, Legal (piece) With 12 Inside Pockets With Index Tab, For Legal Size Paper /documents, Dimension (min.): Cover (flap): Width: 220mm Length: 380mm Thickness: 0.60mm, Inside Pocket: Width: 230mm Length: 360mm Thickness: 0.12mm 49 pack "file Tab Divider, A4, For 210mm X 297mm (a4 Size) Documents, Size (min): Leaf: Length: 297mm Width: 210mm Tab: Length: 65mm Width: 12mm, Basis Weight: 153gsm (-5%), Thickness: 0.22mm (min.) " 37 pack Folder, L-type, Legal, Materials: Plastic, Size: 235mm X 346mm (min.) Thickness: (min.): 0.17mm, Transparent For Easy Identification Of Contents, Assorted Colors 3 box "folder, Pressboard (box) • Material: Heavy Duty Paper Board • Size: 369mm X 242mm (-smm) • Thickness: 0.40mm (min.) • Basis Weight: 312gsm (min.) • Color: Cream, Green Or Maroon, Etc. • Accordion-pleat Gusset: Latex Paper/pvc Bookbinder/book Cloth/paper Cloth, Color: Green, Red, Blue, Expansion: 39mm (-3mm)" 1 pack Folder With Tab, A4, Material: Tagboard/carrier/foldcote/cupstock Board, Leaf Dimension: 240mm X 320mm (+1mm), Tab: 13mm (+2mm), Scoring: 20mm From Edge Of Forlder (+2mm), Other Physical Properties: Grammage G/m²:308 (-5%), Thickness, Mm:0.35 (min), Tearing Resistance, Mn, Md + Cd 2940 (min), Stiffness, Mn.m, (taber) Md + Cd: 13 (min) 45 pack Folder With Tab, Legal (pack) Material: Tagboard/carrier/foldcote/cupstock Board, Leaf Dimension: 240mm X 320mm (+1mm), Tab: 13mm (+2mm), Scoring: 20mm From Edge Of Forlder (+2mm), Other Physical Properties: Grammage G/m²:308 (-5%), Thickness, Mm:0.35 (min), Tearing Resistance, Mn, Md + Cd 2940 (min), Stiffness, Mn.m, (taber) Md + Cd: 13 (min) 27 box "index Tab (box) Transparent, Self-adhesive, Assorted Colors, Five (5) Sets Per Box, One (1) Set Composed Of 2-pieces 6"" Tab Strip And Two (2) Complete Alphabets" 40 piece Magazine File Box, Large, Material: Chipboard: 3mm Thick (min.), Leatherette Paper For Outside Cover, Coated Paper For Inside Cover, Outside Dimension: :width: 110mm (min), Height: 265mm (min), Length: 220mm (min) 36 set Marker, Flourescent (set) Barrel: Flat, Tip: Chisel Point, Color: Three (3) Assorted Colors Per Set, Material And Structure: The Barrel And The Cap Shall Be Made Of Plastic And The Cap Shall Fit Snugly Or Firmly To The Barrel And Of Such Structure That Will Easily Cap And Uncap, Quality: Writing Performance: Flourescent Marker Shall Continuously Highlight On Multipurpose Paper For A Distance Of At Least 100 Meters Under Normal Pressure And Shall Not Show Noticeable Change In Ink Intensity. Cap-off Time: 45 Minutes (min) 225 piece Marker, Permanent, Black (piece) Ink Color: Black, Tip: Felt, Bullet Type, Point: Medium, Structure: The Barrel And The Cap Shall Fit Snugly Or Firmly To The Barrel And Os Such Structure That Shall Easily Cand And Uncap 80 piece Marker, Permanent, Blue (piece) Ink Color: Blue, Tip: Felt, Bullet Type, Point: Medium, Structure: The Barrel And The Cap Shall Fit Snugly Or Firmly To The Barrel And Os Such Structure That Shall Easily Cand And Uncap 86 piece Marker, Whiteboard, Black (piece) Ink Color: Black, Blue, Red, Tip: Felt, Bullet Type, Structure: The Barrel And The Cap Shall Fit Snugly Or Firmly To The Barrel And Of Such Structure That Shall Easily Cand And Uncap 19 piece Marker, Whiteboard, Red, Ink Color: Red, Tip: Felt, Bullet Type, Structure: The Barrel And The Cap Shall Fit Snugly Or Firmly To The Barrel And Of Such Structure That Shall Easily Cand And Uncap 76 box Paper Clip, Vinly/plastic Coated, 33mm (box) Wire Diameter: 0.80mm (min), Length Of Clip: 33mm (min), Total Length Of Wire Used: 102mm (min), Assorted Colors 100 Box Paper Clip, Vinly/plastic Coated, Jumbo, 50mm (box) Wire Diameter: 1.0mm (min), Length Of Clip: 50mm (min), Total Length Of Wire Used: 155mm (min), Assorted Colors 19 Box Pencil, Lead/graphite, With Eraser, Hardness: Hb Or 2, Lead/graphite Diameter: 2mm (min), Wood Casing: Softwood, Coated, Free From Defects As Cross Grains, Interlocked Grains, Warpage Knots And The Like; And Shall Permit Easy Sharpening 11 Piece Pencil Sharpener, Table Mountable Type, With Metal Clamp, Single Cutter-head, One Hole Guide, 9-10mm In A Diameter, All Main Parts Shall Be Made Of Metal Particularly The Cutting Mechanism Cutter,pinion Gear,internal Gear,handle 23 Piece Puncher, Paper, Heavy Duty (piece) Punching Capacity: 30 Sheets Of 70gsm Multipurpose Paper, With Two Hole Guide, Diameter Of Hole: 7mm (approx) 19 Box Rubber Band No. 18 (box) 35o Grams (min) (net Weight), Thickness: 1.00mm (min), Lay Flat Length: 70mm (min), Tensile Strength: 9.81mpa (min), Elongation: 250% (min) 31 Piece Stamp Pad, Felt (piece) Thickness Of Felt: 5mm (min.), Thickness Of Metal: 0.20mm (min.), Stamp Bed Size: Width: 60mm (min.), Length: 100mm (min.) 68 Pair Scissors, Symmetrical/asymmetrical (pair) Overall Length: 160mm (min), Length Of The Cutting Blade: 70mm (min), Thickness Of The Cutting Blade: 1.70mm (min), Length Of Metal Handle (measured From The Center Of The Binding Rivet Screw To The Tip Of The Metal Handle): 35mm (min) 37 Piece Stapler, Standard Type (piece) Loading Capacity: 200 Staples (min), One Time Binding Capacity Of 2-20 Sheets Multi-purpose Paper (70gsm)r 6 Unit Stapler, Heavy Duty (binder) (unit) Type: Desktop, High Capacity/volume, Compatible With The Following Staple Sizes: 13mm And 17mm, Material: Body: Metal, Bases Grip: Non-skid Durable Material, Stapling Capacity: 25-135 Sheets Of 70gsm Multi-purpose Paper, Load Capacity: 100 Staples (min), Throat: Depth: 65mm (min) With Adjustable Paper Guide, Dimension: Manufacturer's Standard 9 Piece Tape Dispenser, Table Top (piece) Net Weight (min.): 1.2kg, Body Made Of Rigid Plastic, Smooth Finish: Weighted, Serrated Cutting Blade Thickness: 0.40mm +0.03mm, Holds Rolls Up To 24mm Wide On 75mm Core, Assorted Color 17 Pack Cartolina, Assorted Colors (pack) Bristol Board, Size: 572mm X 724mm (-3mm), Basis Weight: 100gsm (min.), Thickness: 0.12mm (min.), Assorted Colors: Blue, Green, Yellow, Orange, Lavender, Violet, Gold And Pink, Minimum Of Four (4) Colors 158 Pad "notepad, Stick-on, 50mm X 76mm (pad) Size: 50mm X 76mm (2"" X 3"") (min), Basis Weight: 70gsm (min), Sheet Thickness: 0.09mm (min), Assorted Colors" 175 Pad "notepad, Stick-on, 76mm X 100mm (pad) Size: 76mm X 100mm (3"" X 4"") (min), Basis Weight: 70gsm (min), Sheet Thickness: 0.09mm (min), Assorted Colors" 98 Pad "notepad, Stick-on, 76mm X 76mm (pad) Size: 76mm X 76mm (3"" X 3"") (min), Basis Weight: 70gsm (min), Sheet Thickness: 0.09mm (min), Assorted Colors" 153 Piece Steno Notebook (piece) Basis Weight: 55gsm (-5%) Bond, Thickness: 0.075mm (min), Size: 150mm X 225mm, (min), Top Margin: 25mm (min.), Bottom Margin: 5mm, Number Of Spaces: 22 (min), Cover Thickness: 0.40mm (-0.02mm), 40 Leaves, Ruled Both Sides 40 Bond Paper , Legal, 70 Gsm 40 Ream Bond Paper , A4, 70 Gsm 591 Ream Paper, Multicopy A4 (ream) Basis Weight: 80gsm (-3%), Size: A4, 210mm X 297mm (+2mm In Either Direction), Trim Sizes Shall Be Along Machine Direction Or Long Grain 156 Ream Paper, Multicopy Legal (ream) Basis Weight: 80gsm (-3%), Size: Legal, 216mm X 330mm (+2mm In Either Direction), Trim Sizes Shall Be Along Machine Direction Or Long Grain 419 Ream Paper, Multipurpose A4, Basis Weight: 80gsm (min.), Size: Legal, 216mm X 330mm (+2mm In Either Direction), Trim Sizes Shall Be Along Machine Direction Or Long Grain 93 Ream Paper, Multipurpose Legal, Basis Weight: 80gsm (min.), Size: Legal, 216mm X 330mm (+2mm In Either Direction), Trim Sizes Shall Be Along Machine Direction Or Long Grain 15 Box Paper, Parchment, Size: 210mm X 297mm (+2mm In Either Direction), Basis Weight: 80gsm (-5%), Fine Translucent, Suitable For Laser/inkjet Printing 48 Book Record Book, 300 Pages (book) Basis Wieght: 55gsm (-5%), Thickness: 0.07mm (minimum), Size: L X W: 265mm X 165mm (minimum), Cover Material: Laminated Chipboard, Thickness: 1.5mm (minimum) Size: L X W: 278mm X 175mm (minimum), Margins Top: 25mm (-2mm), Bottom: 8mm (+4mm), Left / Right: Manufacturer's Standard 37 Book "record Book, 500 Pages (book) Basis Weight: 55 Gsm (-5%) Thickness 0.07 Mm (minimum) Size L X W: 265mm X 165mm (minimum) Cover Material Laminated Chipboard Thickness 1.5mm (minimum) Size L X W: 278mm X 175mm (minimum) Margins Top 25mm (-2mm) Bottom 8mm (±4mm) Left / Right Manufacturer’s Standard" 35 Cart Ink Cartridge, Epson C13t664100 (t6641), Black 30 Cart Ink Cartridge, Epson C13t664200 (t6642), Cyan 30 Cart Ink Cartridge, Epson C13t664300 (t6643), Magenta 30 Cart Ink Cartridge, Epson C13t664400 (t6644), Yellow 1054 piece Ballpen 36 pack Sticker Paper , A4, Matte, White, 10 Pcs/pack 21 pack Sticker Paper , Legal, Matte, White, 10 Pcs/pack 25 roll Double Sided Tape 31 pack Photo Paper, A4 Size, Glossy, 10 Sheets/pack 15 packs Photo Paper Legal 4 bottle Disinfectant Bleaching Solution, 3.78 Lit 67 piece Certificate Frame, A4, Orientation: Landscape, Pvc Black 195 piece Certificate Holder, A4, Plastic 1 unit Microphone 74 box Plastic Fastener, Size: Regular (50pcs/box) 14 box Plastic Fastener, Size: Long 2 piece Extension Cord 2 pack Push Pin 12 piece Glue Stick (paste) 5 pack Glue Stick (for Glue Gun) 2 unit Ergonomic Chair, (midback Synthetic Leather Finished Office Chair- Padded Steel Armrest With Heavy Duty Base With Nylon Caster Wheels, With Pneumatic Gaslift For Height Adjustment) 1 unit Executive Chair (for Fo Head) 2 unit Glue Gun 2 unit Speakers 113 bottle Ink Cartridge, Epson 003 Yellow 109 bottle Ink Cartridge, Epson 003 Magenta 109 bottle Ink Cartridge, Epson 003 Cyan 131 bottle Ink Cartridge, Epson 003 Black 10 bottle Ink Cartridge, Hp Gt52 Yellow 10 bottle Ink Cartridge, Hp Gt52 Magenta 10 bottle Ink Cartridge, Hp Gt52 Cyan 10 bottle Ink Cartridge, Hp Gt53 Black 18 bottle Ink, Brother, Black, Btd60bk, 108ml 9 bottle Ink, Brother, Cyan, Bt5000c, 48.8ml 9 bottle Ink, Brother, Yellow, Bt5000c, 48.8ml 6 bottle Ink, Brother, Magenta, Bt5000c, 48.8ml 37 bottle Ink Refill, Epson Ink 001, Black, 127ml 29 bottle Ink Refill, Epson Ink 001, Cyan, 65ml 29 bottle Ink Refill, Epson Ink 001, Magenta, 65ml 29 bottle Ink Refill, Epson Ink 001, Yellow, 65ml 5 Box Sign Pen, Uniball-impact Gel, Ruber Grip, Steel Point, Water-based Pigment Gel Ink 1.0% Ball, Approx 0.6% Line, 12 Pcs/box 58 Piece Sign Penm Black, Gel 0.7mm 12 Piece Sign Pen, Ink Refill, 0.5, My Gel 3 Meter Pdx Loomex Wire 2 Cart Tonner (5501i, No. Tk6309) 12 Packs Notarial Seal Box Notarial Seal (gold), No. 23, 25pcs/box 1 Piece Glass Top Corner Table 2 Piece Steel Filing Cabinet Four Drawers, Vertical 15 Packs Specialty Board, A4 21 Pad Sign Here Sticky Note Pad 30 Packs Specialty Paper, A4 Lot B 58 Bottle Alcohol, Ethyl, 500 Ml, 68% - 72% Ethyl Alcohol, Fully Miscible In Water, Flip-top Cap, Scented 49 Gallon Alcohol, Ethyl, 1 Gallon, , Strength: 68% - 72%, Volume: 1 Gallon, Bottle: Hdpe 51 Can Air Freshener (can) Aerosol Type, Net Content: 150g (min), Assorted Scents (at Least Three (3) Scents), Long Lasting Fragrance (scent Trace Lingers For Atleast 5 Min.) 10 Piece Broom (walis Tambo) (piece)weight: 500 Grams (max), Handle: Plastic Coated Aluminum Tube, Diameter Of Handle: 19mm (min), Length Of Handle: 545mm (min), Dry Weight Of The Tiger Grass: 200grams (min), Usable Length Of Tiger Grass: 300mm (min), With Upper Stitch: 20 (min) Lower Stitch: 30 (min) 5 Piece Broom (walis Ting-ting) (piece) Made Of Mature Coconut Midribs, Standard Size (min.): 140mm Grip, Measured 150mm From The Top,usable Length (min.): 760mm, Rib Count (min.): 350 Pieces 55 Bottle Cleaner, Toilet Bowl And Urinal (bottle) Color: Cear Or Blue, Net Content: 900ml - 1000ml In Rigid Plastic Bottle, Not Chlorine Based, Viscosity: 114cp At 25°c Min Using Ostwald Method 15 Bar Detergent Bar (piece) Net Weight: 140 Grams As Packed (-2.5%) 30 Pouch Detergent Powder, All-purpose, 1kg, Net Weight: One (1) Kilogram (-2.5%) 51 Can Disinfectant Spray (can) Aerosol Type, Net Content Per Can: 400 Grams (min), Crisp, Clean Scent 11 Piece Dust Pan (piece) Made Of Rigid Non-breakable Plastic, With Detachable Handle: Diameter (min.): 30mm, Length (min.): 600mm, Base (min.): Thickness: 1.25mm, Front Width: 260mm, Back Width: 200mm, Depth: 225mm 13 Can "furniture Cleaner (can) Aerosol Type • For All Types Of Surfaces Such As Furniture, Cabinets And Countertops, Vinyl And Leather, Etc. • Net Content (min.): 300mi Per Can • Pleasant Smell. • Sufficient Amount Of Propellant To Totally Expel Content. • Shelf Life: Must Have A Shelf Life Of At Least Twenty-four (24) Months From The Date Of Manufacture But Not Less Than Eighteen (18) Months From The Date Of Delivery" 48 Bottle Hand Soap, Liquid, 500ml (bottle) Mild Scented, Bactericidal/germicidal Property, Individual Packed Plastic Bottle, Packaging: Standard Packaging Of The Manufacture 1 Unit Mop Bucket, Heavy Duty, Hard Plastic, Material: Hard Palstic, Approximate Size (min.), Width: 370mm Length: 475mm Height: 245mm, Capacity: 30 Liters 4 Piece Mophandle, Heavy Duty, Screw Type, Screw Type, With Metal Mop Head Clipper, Aluminum Handle: Thickness (min.): 0.70mm, Outside Diameter: 22mm To 25mm Length (min.): 1.5 Meters 10 Piece Mophead, Made Of Rayon, 36 Stands Per Head (min), 3 Ply's Per Stand, 40 Threads Per Ply, Weight:400 Grams (min), Length: 410mm (min), Length Of Band: 170mm (min), Breaking Strength, Kg: 126 (min) 5 Kilo "rags All Cotton (bundle) Diameter: 178mm (7"") (approx.) Minimum Of Thirty-two (32) Pieces To A Kilogram, Assorted Colors" 7 Pack Scouring Pad (pack) Made Of Synthetic Nylon, 150mm X 200m (min.), Thickness (min.): 8mm, Color: Green 56 Pack/roll "trashbag, Xxl Size (roll/pack) Color: Black, Dimension: 940mm X 1016mm (-6mm) (37"" X 40""), Thickness: 0.02mm (min), Tensile Strength At Break: Astm D882, One Way: 15n/mm² (min), Other Way: 12n/mm² (min), Elongation At Break: Astm D882, One Way: 400% (min), Other Way: 600% (min)" 54 Pack/roll Trashbag, Large Size (roll/pack) 29 Pack/roll Trashbag, Xl Size (roll/pack) 19 Piece Wastebasket, Non-rigid Plastic, Made Of Rigid Plastic, Thickness (min.): 1.20mm, Height (min.): 225mm, Full Volume (up To The Lid): 8.5 Liters (min.), Assorted Colors 44 bottle Dishwashing Liquid Lemon/calamansi 25 pcs Dishwashing Paste, 200g 34 Pack Tissue, Interfolded Paper Towel (pack) Basis Weight: 34gsm (+/-2gsm), Sheet Dimension: Width Of Sheet: 200mm (+3mm), Length Of Sheet: 200mm (+3mm), Total Number Of Sheets Per Pack: 150 Pulls, Interfolded, Number Of Ply: One (1) Ply 164 Pack Toilet Tissue Paper, 2 Ply (pack) , 100% Recycled, 12 Rolls Per Pack, Weight: 28gsm (min.), Sheet Dimension: Width Of Sheet: 100mm (+/-3mm), Length Of Sheet: 114mm (-5mm) 18 Bottle Hand Sanitizer (bottle) Form: Liquid Or Gels, Volume: 500ml, Hypoallergenic, Non-drying, Bottle: Pump Dispenser Plastic, Fda Certificate Of Product Registration/notification 20 Can Insecticide (can) Aerosol, Kerosene Based, Quick Kill Contact And Residual Type, Cautionary Scent/odor Required, Multi-insect Killer, Net Content Per Can: 600ml (min.) 41 piece Toilet Deodorant Cake, Assorted, 100grms 6 Pcs Doormat Xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
Closing Date9 Dec 2024
Tender AmountPHP 1.1 Million (USD 19 K)
Municipality Of Mapanas, Northern Samar Tender
Philippines
Details: Description Bidding Documents Procurement Of Infrastructure Projects Name Of Project: Rehabilatation/improvement Of San Roque St. Barangay Sta. Potenciana Mapanas, Northern Samar Contract Reference No. 2024-11-106 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 7 Section Iii. Bid Data Sheet 35 Section Iv. General Conditions Of Contract 38 Section V. Special Conditions Of Contract 70 Section Vi. Specifications 72 Section Vii. Drawings 75 Section Viii. Bill Of Quantities Error! Bookmark Not Defined. Section Ix. Bidding Forms 77 Section X. Foreign-assisted Projects Error! Bookmark Not Defined. Section I. Invitation To Bid Bid Notice Abstract Invitation To Bid (itb) Republic Of The Philippines Province Of Northern Samar Municipality Of Mapanas Invitation To Bid For Project: Rehabilatation / Improvement Of San Roque St. Barangay Sta Potenciana, Mapanas, Northern Samar The Lgu- Mapanas, Northern Samar, Through The Economic Development Fund Of Fy 2025 Intends To Apply The Sum Of Nine Hundred Ninety Eight Thousand Seven Hundred Fifty Pesos 33/100 Only (p998,750.33) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For: Rehabilitation / Improvement Of San Roque St. Barangay Sta. Potenciana, Mapanas, Northern Samar Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Lgu- Mapanas, Northern Samar Now Invites Bids For The Following Description Of Works To Be Procured: Item No. Scope Of Work Quantity Unit Rehabilitation / Improvement Of San Roque St. Barangay Sta. Potenciana, Mapanas, Northern Samar Part B Other General Requirements B.5 Projects Billboard/sign Board 1.00 Each B.7(2) Occupational Safety And Health Program 1.00 L.s B.9 Mobilization/demobilization 1.00 L.s Part C Earthworks 101(3)a.2 Removal Existing Pcc Pavement, 0.2m Thk (pcc Reblocking At Intermittent Section 265.00 Sq.m 102(2)b Surplus Common Excavation 113.00 Cu.m 105(1) Subgrade Preparation (common Materials) 324.00 Sq.m Part D Subbase And Base Course 200(1) Aggregate Subbase Course 59.20 Cu.m 201(1) Aggregate Base Course 64.80 Cu.m Part E Surface Courses 311(1)a.2 Pcc Pavement (plain) Convention Method, 200mm Thk 270 Sq.m Completion Of The Works Is Required 45 Calendar Days. Bidders Should Have Completed, Within Ten (10) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. Section Ii. Instructions To Bidders. 2. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From Lgu- Bac Mapanas, Northern Samar And Inspect The Bidding Documents At The Address Given Below From November 26, 2024-december 13, 2024, 8:00 A.m. To 5:00 Pm. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of P1,000.00. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later That The Submission Of Their Bids. 5. The Lgu- Mapana, Northern Samar Will Hold A Pre-bid Conference On December 5, 2024 At 10:00 A.m. At Executive Conference, 2nd Floor Of New Municipal Bldg. Mapanas, Northern Samar, Which Shall Be Open Only To All Interested Parties Who Have Purchased The Bidding Documents. 6. Bids Must Be Delivered To The Address Below On Or Before 9:00 A.m. Of December 16, 2024 At Bac Office, @ Municipal Planning & Development Office (mpdo), Mapanas, Northern Samar. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bids Will Be Opened In The Presence Of The Bidders’ Authorized Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. The Bidder May Request That The Bid Documents Be Sent To Them By Mail Or Courier, And For This, The Bidder Shall Pay The Amount In Philippine Peso To Cover The Cost Of Mail Or Courier Delivery. The Fee For Obtaining A Copy Of The Bid Documents And The Cost Of Mail Or Courier Shall Be Paid By The Bidder Thru S Cashier’s Check Or Manager’s Check Issued In Favor Of The Municipality Of Mapanas. 7. The Lgu- Mapanas, Northern Samar Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 8. For Further Information, Please Refer To: Reno C. Salazar Bac Secretary Mapanas, Northern Samar Mobile # 09459852914 Ma. Teresa L. Minguez Bac Chairperson Mapanas, Northern Samar Mobile # 09778033758 Section Ii. Instructions To Bidders 1. The Bids Must Be Delivered On Or Before December 16, 2024 At 9:00 A.m And Failure To Submit The Bid Proposal May Ground For Disqualification Of The Bid. 2. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Lgu- Mapanas, Northern Samar Now Invites Bids For The Following Description Of Works To Be Procured: Item No. Scope Of Work Quantity Unit Rehabilitation / Improvement Of San Roque St. Barangay Sta. Potenciana, Mapanas, Northern Samar Part B Other General Requirements B.5 Projects Billboard/sign Board 1.00 Each B.7(2) Occupational Safety And Health Program 1.00 L.s B.9 Mobilization/demobilization 1.00 L.s Part C Earthworks 101(3)a.2 Removal Existing Pcc Pavement, 0.2m Thk (pcc Reblocking At Intermittent 265.00 Sq.m 102(2)b Surplus Common Excavation 113.00 Cu.m 105(1) Subgrade Preparation (common Materials) 324.00 Sq.m Part D Subbase And Base Course 200(1) Aggregate Subbase Course 59.20 Cu.m 201(1) Aggregate Base Course 64.80 Cu.m Part E Surface Courses 311(1)a.2 Pcc Pavement (plain) Convention Method, 200mm Thk 270 Sq.m Completion Of The Works Is Required 45 Calendar Days. Bidders Should Have Completed, Within Ten (10) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 2. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 3. Interested Bidders May Obtain Further Information From Lgu- Bac Mapanas, Northern Samar And Inspect The Bidding Documents At The Address Given Below From November 26, 2024-december 13, 2024, 8:00 A.m. To 5:00 Pm. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of P1,000.00. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later That The Submission Of Their Bids. 4. The Lgu- Mapanas, Northern Samar Will Hold A Pre-bid Conference On December 5, 2024 At 10:00 A.m. At Executive Conference, 2nd Floor Of New Municipal Bldg. Mapanas, Northern Samar, Which Shall Be Open Only To All Interested Parties Who Have Purchased The Bidding Documents. 5. Bids Must Be Delivered To The Address Below On Or Before 9:00 A.m. Of December 16, 2024 At Bac Office, @ Municipal Planning & Development Office (mpdo), Mapanas, Northern Samar. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bids Will Be Opened In The Presence Of The Bidders’ Authorized Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. The Bidder May Request That The Bid Documents Be Sent To Them By Mail Or Courier, And For This, The Bidder Shall Pay The Amount In Philippine Peso To Cover The Cost Of Mail Or Courier Delivery. The Fee For Obtaining A Copy Of The Bid Documents And The Cost Of Mail Or Courier Shall Be Paid By The Bidder Thru S Cashier’s Check Or Manager’s Check Issued In Favor Of The Municipality Of Mapanas. 6. The Lgu- Mapanas, Northern Samar Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 7. For Further Information, Please Refer To: Reno C. Salazar Bac Secretary Mapanas, Northern Samar Mobile # 09459852914 Ma. Teresa L. Minguez Bac Chairperson Mapanas N. Samar Mobile # 09778033758 Table Of Contents A. General 11 1. Scope Of Bid 11 2. Source Of Funds 11 3. Corrupt, Fraudulent, Collusive, And Coercive Practices 11 4. Conflict Of Interest 12 5. Eligible Bidders 14 6. Bidder’s Responsibilities 15 7. Origin Of Goods And Services 17 8. Subcontracts 17 B. Contents Of Bidding Documents 17 9. Pre-bid Conference 17 10. Clarification And Amendment Of Bidding Documents 18 C. Preparation Of Bids 18 11. Language Of Bids 18 12. Documents Comprising The Bid: Eligibility And Technical Components 18 13. Documents Comprising The Bid: Financial Component 21 14. Alternative Bids 21 15. Bid Prices 22 16. Bid Currencies 22 17. Bid Validity 23 18. Bid Security 23 19. Format And Signing Of Bids 25 20. Sealing And Marking Of Bids 26 D. Submission And Opening Of Bids 26 21. Deadline For Submission Of Bids 26 22. Late Bids 26 23. Modification And Withdrawal Of Bids 27 24. Opening And Preliminary Examination Of Bids 27 E. Evaluation And Comparison Of Bids 28 25. Process To Be Confidential 28 26. Clarification Of Bids 29 27. Detailed Evaluation And Comparison Of Bids 29 28. Post Qualification 30 29. Reservation Clause 31 F. Award Of Contract 32 30. Contract Award 32 31. Signing Of The Contract 33 32. Performance Security 33 33. Notice To Proceed 34 A. General 1. Scope Of Bid 1.1. The Procuring Entity As Defined In The Bds, Invites Bids For The Construction Of Works, As Described In Section Vi. Specifications. The Name And Identification Number Of The Contract Is Provided In The Bds. 1.2. The Successful Bidder Will Be Expected To Complete The Works By The Intended Completion Date Specified In Scc Clause 1.16. 2. Source Of Funds The Procuring Entity Has A Budget Or Has Applied For Or Received Funds From The Funding Source Named In The Bds, And In The Amount Indicated In The Bds. It Intends To Apply Part Of The Funds Received For The Project, As Defined In The Bds, To Cover Eligible Payments Under The Contract For The Works. 3. Corrupt, Fraudulent, Collusive, And Coercive Practices 3.1. Unless Otherwise Specified In The Bds, The Procuring Entity, As Well As Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. In Pursuance Of This Policy, The Funding Source: (a) Defines, For Purposes Of This Provision, The Terms Set Forth Below As Follows: (i) "corrupt Practice" Means Behavior On The Part Of Officials In The Public Or Private Sectors By Which They Improperly And Unlawfully Enrich Themselves, Others, Or Induce Others To Do So, By Misusing The Position In Which They Are Placed, And Includes The Offering, Giving, Receiving, Or Soliciting Of Anything Of Value To Influence The Action Of Any Such Official In The Procurement Process Or In Contract Execution; Entering, On Behalf Of The Procuring Entity, Into Any Contract Or Transaction Manifestly And Grossly Disadvantageous To The Same, Whether Or Not The Public Officer Profited Or Will Profit Thereby, And Similar Acts As Provided In Republic Act 3019; (ii) "fraudulent Practice" Means A Misrepresentation Of Facts In Order To Influence A Procurement Process Or The Execution Of A Contract To The Detriment Of The Procuring Entity, And Includes Collusive Practices Among Bidders (prior To Or After Bid Submission) Designed To Establish Bid Prices At Artificial, Non-competitive Levels And To Deprive The Procuring Entity Of The Benefits Of Free And Open Competition; (iii) “collusive Practices” Means A Scheme Or Arrangement Between Two Or More Bidders, With Or Without The Knowledge Of The Procuring Entity, Designed To Establish Bid Prices At Artificial, Non-competitive Levels; And (iv) “coercive Practices” Means Harming Or Threatening To Harm, Directly Or Indirectly, Persons, Or Their Property To Influence Their Participation In A Procurement Process, Or Affect The Execution Of A Contract; (v) “obstructive Practice” Is (aa) Deliberately Destroying, Falsifying, Altering Or Concealing Of Evidence Material To An Administrative Proceedings Or Investigation Or Making False Statements To Investigators In Order To Materially Impede An Administrative Proceedings Or Investigation Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Into Allegations Of A Corrupt, Fraudulent, Coercive Or Collusive Practice; And/or Threatening, Harassing Or Intimidating Any Party To Prevent It From Disclosing Its Knowledge Of Matters Relevant To The Administrative Proceedings Or Investigation Or From Pursuing Such Proceedings Or Investigation; Or (bb) Acts Intended To Materially Impede The Exercise Of The Inspection And Audit Rights Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Herein. (b) Will Reject A Proposal For Award If It Determines That The Bidder Recommended For Award Has Engaged In Corrupt Or Fraudulent Practices In Competing For The Contract; And (c) Will Declare A Firm Ineligible, Either Indefinitely Or For A Stated Period Of Time, To Be Awarded Contract Funded By The Funding Source If It At Any Time Determines That The Firm Has Engaged In Corrupt Or Fraudulent Practices In Competing Or, Or In Executing, A Contract Funded By The Funding Source. 3.2. Further, The Procuring Entity Will Seek To Impose The Maximum Civil, Administrative, And/or Criminal Penalties Available Under The Applicable Laws On Individuals And Organizations Deemed To Be Involved In Any Of The Practices Mentioned In Itb Clause 3.1(a). 3.3. Furthermore, The Funding Source And The Procuring Entity Reserve The Right To Inspect And Audit Records And Accounts Of A Contractor In The Bidding For And Performance Of A Contract Themselves Or Through Independent Auditors As Reflected In The Gcc Clause 34. 4. Conflict Of Interest 4.1. All Bidders Found To Have Conflicting Interests Shall Be Disqualified To Participate In The Procurement At Hand, Without Prejudice To The Imposition Of Appropriate Administrative, Civil, And Criminal Sanctions. A Bidder May Be Considered To Have Conflicting Interests With Another Bidder In Any Of The Events Described In Paragraphs (a) Through (c) And A General Conflict Of Interest In Any Of The Circumstances Set Out In Paragraphs (d) Through (g) Below: (a) A Bidder Has Controlling Shareholders In Common With Another Bidder; (b) A Bidder Receives Or Has Received Any Direct Or Indirect Subsidy From Any Other Bidder; (c) A Bidder Has The Same Legal Representative As That Of Another Bidder For Purposes Of This Bid; (d) A Bidder Has A Relationship, Directly Or Through Third Parties, That Puts Them In A Position To Have Access To Information About Or Influence On The Bid Of Another Bidder Or Influence The Decisions Of The Procuring Entity Regarding This Bidding Process. This Will Include A Firm Or An Organization Who Lends, Or Temporarily Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement For Or Implementation Of The Project If The Personnel Would Be Involved In Any Capacity On The Same Project; (e) A Bidder Submits More Than One Bid In This Bidding Process. However, This Does Not Limit The Participation Of Subcontractors In More Than One Bid; (f) A Bidder Who Participated As A Consultant In The Preparation Of The Design Or Technical Specifications Of The Goods And Related Services That Are The Subject Of The Bid; Or (g) A Bidder Who Lends, Or Temporary Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement For Or Implementation Of The Project, If The Personnel Would Be Involved In Any Capacity On The Same Project. 4.2. In Accordance With Section 47 Of The Irr Of Ra 9184, All Bidding Documents Shall Be Accompanied By A Sworn Affidavit Of The Bidder That It Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), Members Of The Technical Working Group (twg), Members Of The Bac Secretariat, The Head Of The Project Management Office (pmo) Or The End-user Unit, And The Project Consultants, By Consanguinity Or Affinity Up To The Third Civil Degree. On The Part Of The Bidder, This Clause Shall Apply To The Following Persons: (a) If The Bidder Is An Individual Or A Sole Proprietorship, To The Bidder Himself; (b) If The Bidder Is A Partnership, To All Its Officers And Members; (c) If The Bidder Is A Corporation, To All Its Officers, Directors, And Controlling Stockholders; And (d) If The Bidder Is A Joint Venture (jv), The Provisions Of Items (a), (b), Or (c) Of This Clause Shall Correspondingly Apply To Each Of The Members Of The Said Jv, As May Be Appropriate. Relationship Of The Nature Described Above Or Failure To Comply With This Clause Will Result In The Automatic Disqualification Of A Bidder. 5. Eligible Bidders 5.1. Unless Otherwise Indicated In The Bds, The Following Persons Shall Be Eligible To Participate In This Bidding: (a) Duly Licensed Filipino Citizens/sole Proprietorships; (b) Partnerships Duly Organized Under The Laws Of The Philippines And Of Which At Least Seventy Five Percent (75%) Of The Interest Belongs To Citizens Of The Philippines; (c) Corporations Duly Organized Under The Laws Of The Philippines, And Of Which At Least Seventy Five Percent (75%) Of The Outstanding Capital Stock Belongs To Citizens Of The Philippines; (d) Cooperatives Duly Organized Under The Laws Of The Philippines, And Of Which At Least Seventy Five Percent (75%) Of The Interest Belongs To Citizens Of The Philippines; And (e) Persons/entities Forming Themselves Into A Jv, I.e., A Group Of Two (2) Or More Persons/entities That Intend To Be Jointly And Severally Responsible Or Liable For A Particular Contract: Provided, However, That, In Accordance With Letter Of Instructions No. 630, Filipino Ownership Or Interest Of The Joint Venture Concerned Shall Be At Least Seventy Five Percent (75%): Provided, Further, That Joint Ventures In Which Filipino Ownership Or Interest Is Less Than Seventy Five Percent (75%) May Be Eligible Where The Structures To Be Built Require The Application Of Techniques And/or Technologies Which Are Not Adequately Possessed By A Person/entity Meeting The Seventy Five Percent (75%) Filipino Ownership Requirement: Provided, Finally, That In The Latter Case, Filipino Ownership Or Interest Shall Not Be Less Than Twenty Five Percent (25%). For This Purpose Filipino Ownership Or Interest Shall Be Based On The Contributions Of Each Of The Members Of The Joint Venture As Specified In Their Jva. 5.2. The Procuring Entity May Also Invite Foreign Bidders When Provided For Under Any Treaty Or International Or Executive Agreement As Specified In The Bds. 5.3. Government Corporate Entities May Be Eligible To Participate Only If They Can Establish That They (a) Are Legally And Financially Autonomous, (b) Operate Under Commercial Law, And (c) Are Not Dependent Agencies Of The Gop Or The Procuring Entity. 5.4. (a) Unless Otherwise Provided In The Bds, The Bidder Must Have Completed, Within Ten (10) Years From The Submission Of Bids, A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted To Current Prices Using The National Statistics Office Consumer Price Index. (b) For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bds. For This Purpose, Contracts Similar To The Project Shall Be Those Described In Thebds, And Completed Within The Period Stated In The Invitation To Bid And Itb Clause 12.1(a)(iii). 5.5. The Bidder Must Submit A Computation Of Its Net Financial Contracting Capacity (nfcc) Or A Commitment From A Universal Or Commercial Bank To Extend A Credit Line In Its Favor If Awarded The Contract For This Project (clc). The Nfcc, Computed Using The Following Formula, Must Be At Least Equal To The Abc To Be Bid: Nfcc = [(current Assets Minus Current Liabilities) (k)] Minus The Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Ongoing Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project. Where: K = 10 For A Contract Duration Of One Year Or Less, 15 For A Contract Duration Of More Than One Year Up To Two Years, And 20 For A Contract Duration Of More Than Two Years. The Clc Must Be At Least Equal To Ten Percent (10%) Of The Abc For This Project. If Issued By A Foreign Bank, It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank. In The Case Of Local Government Units (lgus), The Bidder May Also Submit Clc From Other Banks Certified By The Bangko Sentral Ng Pilipinas (bsp) As Authorized To Issue Such Financial Instrument. 6. Bidder’s Responsibilities 6.1. The Bidder Or Its Duly Authorized Representative Shall Submit A Sworn Statement In The Form Prescribed In Section Ix. Bidding Forms As Required In Itb Clause 12.1(b)(iii). 6.2. The Bidder Is Responsible For The Following: (a) Having Taken Steps To Carefully Examine All Of The Bidding Documents; (b) Having Acknowledged All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; (c) Having Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; (d) Having Complied With Its Responsibility To Inquire Or Secure Supplemental/bid Bulletin/s As Provided Under Itb Clause 10.3. (e) Ensuring That It Is Not “blacklisted” Or Barred From Bidding By The Gop Or Any Of Its Agencies, Offices, Corporations, Or Lgus, Including Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Gppb; (f) Ensuring That Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; (g) Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative/s To Verify All The Documents Submitted; (h) Ensuring That The Signatory Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary And/or To Represent The Bidder In The Bidding, With The Duly Notarized Secretary’s Certificate Attesting To Such Fact, If The Bidder Is A Corporation, Partnership, Cooperative, Or Joint Venture; (i) Complying With The Disclosure Provision Under Section 47 Of The Act In Relation To Other Provisions Of Republic Act 3019; And (j) Complying With Existing Labor Laws And Standards, If Applicable. Failure To Observe Any Of The Above Responsibilities Shall Be At The Risk Of The Bidder Concerned. 6.3. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contract Works And The Conditions For This Project And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 6.4. It Shall Be The Sole Responsibility Of The Prospective Bidder To Determine And To Satisfy Itself By Such Means As It Considers Necessary Or Desirable As To All Matters Pertaining To This Project, Including: (a) The Location And The Nature Of The Contract, Project, Or Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work. 6.5. The Procuring Entity Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Or Conclusions By The Prospective Or Eligible Bidder Out Of The Data Furnished By The Procuring Entity. 6.6. Before Submitting Their Bids, The Bidders Are Deemed To Have Become Familiar With All Existing Laws, Decrees, Ordinances, Acts And Regulations Of The Philippines Which May Affect The Contract In Any Way. 6.7. The Bidder Shall Bear All Costs Associated With The Preparation And Submission Of His Bid, And The Procuring Entity Will In No Case Be Responsible Or Liable For Those Costs, Regardless Of The Conduct Or Outcome Of The Bidding Process. 6.8. Bidders Should Note That The Procuring Entity Will Only Accept Bids Only From Those That Have Paid The Nonrefundable Fee For The Bidding Documents At The Office Indicated In The Invitation To Bid. 7. Origin Of Goods And Services There Is No Restriction On The Origin Of Goods, Or Contracting Of Works Or Services Other Than Those Prohibited By A Decision Of The United Nations Security Council Taken Under Chapter Vii Of The Charter Of The United Nations. 8. Subcontracts 8.1. Unless Otherwise Specified In The Bds, The Bidder May Subcontract Portions Of The Works To An Extent As May Be Approved By The Procuring Entity And Stated In The Bds. However, Subcontracting Of Any Portion Shall Not Relieve The Bidder From Any Liability Or Obligation That May Arise From The Contract For This Project. 8.2. Subcontractors Must Submit The Documentary Requirements Under Itb Clause 12 And Comply With The Eligibility Criteria Specified In The Bds. In The Event That Any Subcontractor Is Found By The Procuring Entity To Be Ineligible, The Subcontracting Of Such Portion Of The Works Shall Be Disallowed. 8.3. The Bidder May Identify The Subcontractor To Whom A Portion Of The Works Will Be Subcontracted At Any Stage Of The Bidding Process Or During Contract Implementation. If The Bidder Opts To Disclose The Name Of The Subcontractor During Bid Submission, The Bidder Shall Include The Required Documents As Part Of The Technical Component Of Its Bid. B. Contents Of Bidding Documents 9. Pre-bid Conference 9.1. (a) If So Specified In The Bds, A Pre-bid Conference Shall Be Held At The Venue And On The Date Indicated Therein, To Clarify And Address The Bidders’ Questions On The Technical And Financial Components Of This Project. (b) The Pre-bid Conference Shall Be Held At Least Twelve (12) Calendar Days Before The Deadline For The Submission Of And Receipt Of Bids. If The Procuring Entity Determines That, By Reason Of The Method, Nature, Or Complexity Of The Contract To Be Bid, Or When International Participation Will Be More Advantageous To The Gop, A Longer Period For The Preparation Of Bids Is Necessary, The Pre-bid Conference Shall Be Held At Least Thirty (30) Calendar Days Before The Deadline For The Submission And Receipt Of Bids, As Specified In The Bds. 9.2. Bidders Are Encouraged To Attend The Pre-bid Conference To Ensure That They Fully Understand The Procuring Entity’s Requirements. Non-attendance Of The Bidder Will In No Way Prejudice Its Bid; However, The Bidder Is Expected To Know The Changes And/or Amendments To The Bidding Documents As Recorded In The Minutes Of The Pre-bid Conference And The Supplemental/bid Bulletin. 9.3. Any Statement Made At The Pre-bid Conference Shall Not Modify The Terms Of The Bidding Documents Unless Such Statement Is Specifically Identified In Writing As An Amendment Thereto And Issued As A Supplemental/bid Bulletin. 10. Clarification And Amendment Of Bidding Documents 10.1. Bidders Who Have Purchased The Bidding Documents May Request For Clarification(s) On Any Part Of The Bidding Documents Or For An Interpretation. Such A Request Must Be In Writing And Submitted To The Procuring Entity At The Address Indicated In The Bds At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10.2. Supplemental/bid Bulletins May Be Issued Upon The Procuring Entity’s Initiative For Purposes Of Clarifying Or Modifying Any Provision Of The Bidding Documents Not Later Than Seven (7) Calendar Days Before The Deadline For The Submission And Receipt Of Bids. Any Modification To The Bidding Documents Shall Be Identified As An Amendment. 10.3. Any Supplemental/bid Bulletin Issued By The Bac Shall Also Be Posted On The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity Concerned, If Available. Unless, Otherwise Provided In The Bds, It Shall Be The Responsibility Of All Bidders Who Secure The Bidding Documents To Inquire And Secure Supplemental/bid Bulletins That May Be Issued By The Bac. However, Bidders Who Have Submitted Bids Before The Issuance Of The Supplemental/bid Bulletin Must Be Informed And Allowed To Modify Or Withdraw Their Bids In Accordance With Itb Clause 23. C. Preparation Of Bids 11. Language Of Bids The Bid, As Well As All Correspondence And Documents Relating To The Bid Exchanged By The Bidder And The Procuring Entity, Shall Be Written In English. Supporting Documents And Printed Literature Furnished By The Bidder May Be In Another Language Provided They Are Accompanied By An Accurate Translation In English Certified By The Appropriate Embassy Or Consulate In The Philippines, In Which Case The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 12. Documents Comprising The Bid: Eligibility And Technical Components 12.1. Unless Otherwise Indicated In The Bds, The First Envelope Shall Contain The Following Eligibility And Technical Documents: (a) Eligibility Documents – Class "a" Documents: (i) Registration Certificate From The Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives, Or Any Proof Of Such Registration As Stated In The Bds; (ii) Mayor’s Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located; (iii) Statement Of All Its Ongoing And Completed Government And Private Contracts Within Ten (10) Years From The Submission Of Bids, Including Contracts Awarded But Not Yet Started, If Any. The Statement Shall Include, For Each Contract, The Following: (iii.1) Name Of The Contract; (iii.2) Date Of The Contract; (iii.3) Contract Duration; (iii.4) Owner’s Name And Address; (iii.5) Nature Of Work; (iii.6) Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation; (iii.7) Total Contract Value At Award; (iii.8) Date Of Completion Or Estimated Completion Time; (iii.9) Total Contract Value At Completion, If Applicable; (iii.10) Percentages Of Planned And Actual Accomplishments, If Applicable; (iii.11) Value Of Outstanding Works, If Applicable; (iii.12) The Statement Shall Be Supported By The Notices Of Award And/or Notices To Proceed Issued By The Owners; And (iii.13) The Statement Shall Be Supported By The Constructors Performance Evaluation System (cpes) Rating Sheets, And/or Certificates Of Completion And Owner’s Acceptance, If Applicable; (iv) Unless Otherwise Provided In The Bds, Valid Philippine Contractors Accreditation Board (pcab) License And Registration For The Type And Cost Of The Contract For This Project; (v) Audited Financial Statements, Showing, Among Others, The Prospective Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; (vi) Nfcc Computation Or Clc In Accordance With Itb Clause 5.5; And Class "b" Document: (vii) If Applicable, Valid Joint Venture Agreement (jva) Or, In Lieu Thereof, Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful Shall Be Included In The Bid. (b) Technical Documents – (i) Bid Security As Prescribed In Itb Clause 18. If The Bidder Opts To Submit The Bid Security In The Form Of: (i.1) A Bank Draft/guarantee Or An Irrevocable Letter Of Credit Issued By A Foreign Bank, It Shall Be Accompanied By A Confirmation From A Universal Or Commercial Bank; Or (i.2) A Surety Bond Accompanied By A Certification Coming From An Authorized Insurance Commission That A Surety Or Insurance Company Is Authorized To Issue Such Instrument; (ii) Project Requirements, Which Shall Include The Following: (ii.1) Organizational Chart For The Contract To Be Bid; (ii.2) List Of Contractor’s Personnel (viz, Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; And (ii.3) List Of Contractor’s Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project; And (iii) Sworn Statement In Accordance With Section 25.2(b)(iv) Of The Irr Of Ra 9184 And Using The Form Prescribed In Section Ix. Bidding Forms. 13. Documents Comprising The Bid: Financial Component 13.1. Unless Otherwise Stated In The Bds, The Financial Component Of The Bid Shall Contain The Following: (a) Financial Bid Form In Accordance With The Form Prescribed In Section Ix. Bidding Forms; And (b) Any Other Document Related To The Financial Component Of The Bid As Stated In The Bds. 13.2. (a) Unless Indicated In The Bds, All Bids That Exceed The Abc Shall Not Be Accepted. (b) Unless Otherwise Indicated In The Bds, For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Following Conditions Are Met: (i) Bidding Documents Are Obtainable Free Of Charge On A Freely Accessible Website. If Payment Of Bidding Documents Is Required By The Procuring Entity, Payment Could Be Made Upon The Submission Of Bids. (ii) The Procuring Entity Has Procedures In Place To Ensure That The Abc Is Based On Recent Estimates Made By The Engineer Or The Responsible Unit Of The Procuring Entity And That The Estimates Are Based On Adequate Detailed Engineering (in The Case Of Works) And Reflect The Quality, Supervision And Risk And Inflationary Factors, As Well As Prevailing Market Prices, Associated With The Types Of Works Or Goods To Be Procured. (iii) The Procuring Entity Has Trained Cost Estimators On Estimating Prices And Analyzing Bid Variances. In The Case Of Infrastructure Projects, The Procuring Entity Must Also Have Trained Quantity Surveyors. (iv) The Procuring Entity Has Established A System To Monitor And Report Bid Prices Relative To Abc And Engineer’s/procuring Entity’s Estimate. (v) The Procuring Entity Has Established A Monitoring And Evaluation System For Contract Implementation To Provide A Feedback On Actual Total Costs Of Goods And Works. 14. Alternative Bids 14.1. Alternative Bids Shall Be Rejected. For This Purpose, Alternative Bid Is An Offer Made By A Bidder In Addition Or As A Substitute To Its Original Bid Which May Be Included As Part Of Its Original Bid Or Submitted Separately Therewith For Purposes Of Bidding. A Bid With Options Is Considered An Alternative Bid Regardless Of Whether Said Bid Proposal Is Contained In A Single Envelope Or Submitted In Two (2) Or More Separate Bid Envelopes. 14.2. Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 14.3. Each Bidder Shall Submit Only One Bid, Either Individually Or As A Partner In A Jv. A Bidder Who Submits Or Participates In More Than One Bid (other Than As A Subcontractor If A Subcontractor Is Permitted To Participate In More Than One Bid) Will Cause All The Proposals With The Bidder’s Participation To Be Disqualified. This Shall Be Without Prejudice To Any Applicable Criminal, Civil And Administrative Penalties That May Be Imposed Upon The Persons And Entities Concerned. 15. Bid Prices 15.1. The Contract Shall Be For The Whole Works, As Described In Itb Clause 1.1, Based On The Priced Bill Of Quantities Submitted By The Bidder. 15.2. The Bidder Shall Fill In Rates And Prices For All Items Of The Works Described In The Bill Of Quantities. Bids Not Addressing Or Providing All Of The Required Items In The Bidding Documents Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A "0" (zero) For The Said Item Would Mean That It Is Being Offered For Free To The Government. 15.3. All Duties, Taxes, And Other Levies Payable By The Contractor Under The Contract, Or For Any Other Cause, Prior To The Deadline For Submission Of Bids, Shall Be Included In The Rates, Prices, And Total Bid Price Submitted By The Bidder. 15.4. All Bid Prices For The Given Scope Of Work In The Contract As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Specified In Gcc Clause 48. Price Escalation May Be Allowed In Extraordinary Circumstances As May Be Determined By The National Economic And Development Authority In Accordance With The Civil Code Of The Philippines, And Upon The Recommendation Of The Procuring Entity. Furthermore, In Cases Where The Cost Of The Awarded Contract Is Affected By Any Applicable New Laws, Ordinances, Regulations, Or Other Acts Of The Gop, Promulgated After The Date Of Bid Opening, A Contract Price Adjustment Shall Be Made Or Appropriate Relief Shall Be Applied On A No Loss-no Gain Basis. 16. Bid Currencies 16.1. All Bid Prices Shall Be Quoted In Philippine Pesos Unless Otherwise Provided In The Bds. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate Prevailing On The Day Of The Bid Opening. 16.2. If So Allowed In Accordance With Itb Clause 16.1, The Procuring Entity For Purposes Of Bid Evaluation And Comparing The Bid Prices Will Convert The Amounts In Various Currencies In Which The Bid Price Is Expressed To Philippine Pesos At The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 16.3. Unless Otherwise Specified In The Bds, Payment Of The Contract Price Shall Be Made In Philippine Pesos. 17. Bid Validity 17.1. Bids Shall Remain Valid For The Period Specified In The Bds Which Shall Not Exceed One Hundred Twenty (120) Calendar Days From The Date Of The Opening Of Bids. 17.2. In Exceptional Circumstances, Prior To The Expiration Of The Bid Validity Period, The Procuring Entity May Request Bidders To Extend The Period Of Validity Of Their Bids. The Request And The Responses Shall Be Made In Writing. The Bid Security Described In Itb Clause 18 Should Also Be Extended Corresponding To The Extension Of The Bid Validity Period At The Least. A Bidder May Refuse The Request Without Forfeiting Its Bid Security, But His Bid Shall No Longer Be Considered For Further Evaluation And Award. A Bidder Granting The Request Shall Not Be Required Or Permitted To Modify Its Bid. 18. Bid Security 18.1. The Bid Security In The Amount Stated In The Bds Shall Be Equal To The Percentage Of The Abc In Accordance With The Following Schedule: Form Of Bid Security Amount Of Bid Security (equal To Percentage Of The Abc) (a) Cash Or Cashier’s/manager’s Check Issued By A Universal Or Commercial Bank. Two Percent (2%) (b) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank. (c) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security; And/or Five Percent (5%) (d) Any Combination Of The Foregoing. Proportionate To Share Of Form With Respect To Total Amount Of Security For Biddings Conducted By Local Government Units, The Bidder May Also Submit Bid Securities In The Form Of Cashier’s/manager’s Check, Bank Draft/guarantee, Or Irrevocable Letter Of Credit From Other Banks Certified By The Bsp As Authorized To Issue Such Financial Statement. 18.2. The Bid Security Should Be Valid For The Period Specified In The Bds. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 18.3. No Bid Securities Shall Be Returned To Bidders After The Opening Of Bids And Before Contract Signing, Except To Those That Failed Or Declared As Post-disqualified, Upon Submission Of A Written Waiver Of Their Right To File A Motion For Reconsideration And/or Protest. Without Prejudice On Its Forfeiture, Bid Securities Shall Be Returned Only After The Bidder With The Lowest Calculated Responsive Bid Has Signed The Contract And Furnished The Performance Security, But In No Case Later Than The Expiration Of The Bid Security Validity Period Indicated In Itb Clause 18.2. 18.4. Upon Signing And Execution Of The Contract, Pursuant To Itb Clause 31, And The Posting Of The Performance Security, Pursuant To Itb Clause 32, The Successful Bidder’s Bid Security Will Be Discharged, But In No Case Later Than The Bid Security Validity Period As Indicated In Itb Clause 18.2. 18.5. The Bid Security May Be Forfeited: (a) If A Bidder: (i) Withdraws Its Bid During The Period Of Bid Validity Specified In Itb Clause 17; (ii) Does Not Accept The Correction Of Errors Pursuant To Itb Clause 27.3(b); (iii) Fails To Submit The Requirements Within The Prescribed Period, Or A Finding Against Their Veracity, As Stated In Itb Clause 28.2; (iv) Submission Of Eligibility Requirements Containing False Information Or Falsified Documents; (v) Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding; (vi) Allowing The Use Of One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding; (vii) Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid; (viii) Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time; (ix) Refusal To Clarify Or Validate In Writing Its Bid During Post-qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification; (x) Any Documented Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor; (xi) Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared Successful; Or (xii) All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons. (b) If The Successful Bidder: (i) Fails To Sign The Contract In Accordance With Itb Clause 31; (ii) Fails To Furnish Performance Security In Accordance With Itb Clause 32. 19. Format And Signing Of Bids 19.1. Bidders Shall Submit Their Bids Through Their Duly Authorized Representative Using The Appropriate Forms Provided In Section Ix. Bidding Forms On Or Before The Deadline Specified In The Itb Clause 21 In Two (2) Separate Sealed Bid Envelopes, And Which Shall Be Submitted Simultaneously. The First Shall Contain The Technical Component Of The Bid, Including The Eligibility Requirements Under Itb Clause 12.1, And The Second Shall Contain The Financial Component Of The Bid. 19.2. Forms As Mentioned In Itb Clause 19.1 Must Be Completed Without Any Alterations To Their Format, And No Substitute Form Shall Be Accepted. All Blank Spaces Shall Be Filled In With The Information Requested. 19.3. The Bidder Shall Prepare An Original Of The First And Second Envelopes As Described In Itb Clauses 12 And 13. In Addition, The Bidder Shall Submit Copies Of The First And Second Envelopes. In The Event Of Any Discrepancy Between The Original And The Copies, The Original Shall Prevail. 19.4. The Bid, Except For Unamended Printed Literature, Shall Be Signed, And Each And Every Page Thereof Shall Be Initialed, By The Duly Authorized Representative/s Of The Bidder. 19.5. Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By The Duly Authorized Representative/s Of The Bidder. 20. Sealing And Marking Of Bids 20.1. Bidders Shall Enclose Their Original Eligibility And Technical Documents Described In Itb Clause 12, In One Sealed Envelope Marked “original - Technical Component”, And The Original Of Their Financial Component In Another Sealed Envelope Marked “original - Financial Component”, Sealing Them All In An Outer Envelope Marked “original Bid”. 20.2. Each Copy Of The First And Second Envelopes Shall Be Similarly Sealed Duly Marking The Inner Envelopes As “copy No. ___ - Technical Component” And “copy No. ___ – Financial Component” And The Outer Envelope As “copy No. ___”, Respectively. These Envelopes Containing The Original And The Copies Shall Then Be Enclosed In One Single Envelope. 20.3. The Original And The Number Of Copies Of The Bid As Indicated In The Bds Shall Be Typed Or Written In Indelible Ink And Shall Be Signed By The Bidder Or Its Duly Authorized Representative/s. 20.4. All Envelopes Shall: (a) Contain The Name Of The Contract To Be Bid In Capital Letters; (b) Bear The Name And Address Of The Bidder In Capital Letters; (c) Be Addressed To The Procuring Entity’s Bac Identified In Itb Clause 10.1; (d) Bear The Specific Identification Of This Bidding Process Indicated In The Invitation To Bid; And (e) Bear A Warning “do Not Open Before…” The Date And Time For The Opening Of Bids, In Accordance With Itb Clause 21. 20.5. If Bids Are Not Sealed And Marked As Required, The Procuring Entity Will Assume No Responsibility For The Misplacement Or Premature Opening Of The Bid. D. Submission And Opening Of Bids 21. Deadline For Submission Of Bids Bids Must Be Received By The Procuring Entity’s Bac At The Address And On Or Before The Date And Time Indicated In The Bds. 22. Late Bids Any Bid Submitted After The Deadline For Submission And Receipt Of Bids Prescribed By The Procuring Entity, Pursuant To Itb Clause 21, Shall Be Declared “late” And Shall Not Be Accepted By The Procuring Entity. 23. Modification And Withdrawal Of Bids 23.1. The Bidder May Modify Its Bid After It Has Been Submitted; Provided That The Modification Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. The Bidder Shall Not Be Allowed To Retrieve Its Original Bid, But Shall Be Allowed To Submit Another Bid Equally Sealed, Properly Identified, Linked To Its Original Bid Marked As “technical Modification” Or “financial Modification” And Stamped “received” By The Bac. Bid Modifications Received After The Applicable Deadline Shall Not Be Considered And Shall Be Returned To The Bidder Unopened. 23.2. A Bidder May, Through A Letter Of Withdrawal, Withdraw Its Bid After It Has Been Submitted, For Valid And Justifiable Reason; Provided That The Letter Of Withdrawal Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. 23.3. Bids Requested To Be Withdrawn In Accordance With Itb Clause 23.1 Shall Be Returned Unopened To The Bidders. A Bidder May Also Express Its Intention Not To Participate In The Bidding Through A Letter Which Should Reach And Be Stamped By The Bac Before The Deadline For Submission And Receipt Of Bids. A Bidder That Withdraws Its Bid Shall Not Be Permitted To Submit Another Bid, Directly Or Indirectly, For The Same Contract. 23.4. No Bid May Be Modified After The Deadline For Submission Of Bids. No Bid May Be Withdrawn In The Interval Between The Deadline For Submission Of Bids And The Expiration Of The Period Of Bid Validity Specified By The Bidder On The Financial Bid Form. Withdrawal Of A Bid During This Interval Shall Result In The Forfeiture Of The Bidder’s Bid Security, Pursuant To Itb Clause 18.5, And The Imposition Of Administrative, Civil, And Criminal Sanctions As Prescribed By Ra 9184 And Its Irr. 24. Opening And Preliminary Examination Of Bids 24.1. The Bac Shall Open The First Bid Envelopes Of Bidders In Public As Specified In The Bds To Determine Each Bidder’s Compliance With The Documents Prescribed In Itb Clause 12. For This Purpose, The Bac Shall Check The Submitted Documents Of Each Bidder Against A Checklist Of Required Documents To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion. If A Bidder Submits The Required Document, It Shall Be Rated “passed” For That Particular Requirement. In This Regard, Bids That Fail To Include Any Requirement Or Are Incomplete Or Patently Insufficient Shall Be Considered As “failed”. Otherwise, The Bac Shall Rate The Said First Bid Envelope As “passed”. 24.2. Unless Otherwise Specified In The Bds, Immediately After Determining Compliance With The Requirements In The First Envelope, The Bac Shall Forthwith Open The Second Bid Envelope Of Each Remaining Eligible Bidder Whose First Bid Envelope Was Rated “passed”. The Second Envelope Of Each Complying Bidder Shall Be Opened Within The Same Day. In Case One Or More Of The Requirements In The Second Envelope Of A Particular Bid Is Missing, Incomplete Or Patently Insufficient, And/or If The Submitted Total Bid Price Exceeds The Abc Unless Otherwise Provided In Itb Clause 13.1(b), The Bac Shall Rate The Bid Concerned As “failed”. Only Bids That Are Determined To Contain All The Bid Requirements For Both Components Shall Be Rated “passed” And Shall Immediately Be Considered For Evaluation And Comparison. 24.3. Letters Of Withdrawal Shall Be Read Out And Recorded During Bid Opening, And The Envelope Containing The Corresponding Withdrawn Bid Shall Be Returned To The Bidder Unopened. If The Withdrawing Bidder’s Representative Is In Attendance, The Original Bid And All Copies Thereof Shall Be Returned To The Representative During The Bid Opening. If The Representative Is Not In Attendance, The Bid Shall Be Returned Unopened By Registered Mail. The Bidder May Withdraw Its Bid Prior To The Deadline For The Submission And Receipt Of Bids, Provided That The Corresponding Letter Of Withdrawal Contains A Valid Authorization Requesting For Such Withdrawal, Subject To Appropriate Administrative Sanctions. 24.4. If A Bidder Has Previously Secured A Certification From The Procuring Entity To The Effect That It Has Previously Submitted The Above-enumerated Class “a” Documents, The Said Certification May Be Submitted In Lieu Of The Requirements Enumerated In Itb Clause 12.1(a), Items (i) To (vi). 24.5. In The Case Of An Eligible Foreign Bidder As Described In Itb Clause 5, The Class “a” Documents Enumerated In Itb Clause 12.1(a) May Be Substituted With The Appropriate Equivalent Documents, If Any, Issued By The Country Of The Foreign Bidder Concerned. 24.6. Each Partner Of A Joint Venture Agreement Shall Likewise Submit The Documents Required In Itb Clauses 12.1(a)(i) And 12.1(a)(ii). Submission Of Documents Required Under Itb Clauses 12.1(a)(iii) To 12.1(a)(vi) By Any Of The Joint Venture Partners Constitutes Compliance. 24.7. A Bidder Determined As “failed” Has Three (3) Calendar Days Upon Written Notice Or, If Present At The Time Of Bid Opening, Upon Verbal Notification Within Which To File A Request For Reconsideration With The Bac: Provided, However, That The Request For Reconsideration Shall Not Be Granted If It Is Established That The Finding Of Failure Is Due To The Fault Of The Bidder Concerned: Provided, Further, That The Bac Shall Decide On The Request For Reconsideration Within Seven (7) Calendar Days From Receipt Thereof. If A Failed Bidder Signifies His Intent To File A Request For Reconsideration, The Bac Shall Keep The Bid Envelopes Of The Said Failed Bidder Unopened And/or Duly Sealed Until Such Time That The Request For Reconsideration Or Protest Has Been Resolved. E. Evaluation And Comparison Of Bids 25. Process To Be Confidential 25.1. Members Of The Bac, Including Its Staff And Personnel, As Well As Its Secretariat And Twg, Are Prohibited From Making Or Accepting Any Kind Of Communication With Any Bidder Regarding The Evaluation Of Their Bids Until The Issuance Of The Notice Of Award, Unless N The Case Of Itb Clause 26. 25.2. Any Effort By A Bidder To Influence The Procuring Entity In The Procuring Entity’s Decision In Respect Of Bid Evaluation, Bid Comparison Or Contract Award Will Result In The Rejection Of The Bidder’s Bid. 26. Clarification Of Bids To Assist In The Evaluation, Comparison And Post-qualification Of The Bids, The Procuring Entity May Ask In Writing Any Bidder For A Clarification Of Its Bid. All Responses To Requests For Clarification Shall Be In Writing. Any Clarification Submitted By A Bidder In Respect To Its Bid And That Is Not In Response To A Request By The Procuring Entity Shall Not Be Considered 27. Detailed Evaluation And Comparison Of Bids 27.1. The Procuring Entity Will Undertake The Detailed Evaluation And Comparison Of Bids Which Have Passed The Opening And Preliminary Examination Of Bids, Pursuant To Itb Clause 24, In Order To Determine The Lowest Calculated Bid. 27.2. In Evaluating The Bids To Get The Lowest Calculated Bid, The Procuring Entity Shall Undertake The Following: (a) The Detailed Evaluation Of The Financial Component Of The Bids, To Establish The Correct Calculated Prices Of The Bids; And (b) The Ranking Of The Total Bid Prices As So Calculated From The Lowest To Highest. The Bid With The Lowest Price Shall Be Identified As The Lowest Calculated Bid. 27.3. The Procuring Entity's Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary “pass/fail” Criterion. The Bac Shall Consider The Following In The Evaluation Of Bids: (a) Completeness Of The Bid. Unless The Itb Specifically Allows Partial Bids, Bids Not Addressing Or Providing All Of The Required Items In The Schedule Of Requirements Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A "0" (zero) For The Said Item Would Mean That It Is Being Offered For Free To The Procuring Entity; And (b) Arithmetical Corrections. Consider Computational Errors And Omissions To Enable Proper Comparison Of All Eligible Bids. It May Also Consider Bid Modifications If Expressly Allowed In The Bds. Any Adjustment Shall Be Calculated In Monetary Terms To Determine The Calculated Prices. 27.4. Based On The Detailed Evaluation Of Bids, Those That Comply With The Above-mentioned Requirements Shall Be Ranked In The Ascending Order Of Their Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, To Identify The Lowest Calculated Bid. Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, Which Exceed The Abc Shall Not Be Considered, Unless Otherwise Indicated In The Bds. 27.5. The Procuring Entity’s Evaluation Of Bids Shall Only Be Based On The Bid Price Quoted In The Financial Bid Form 27.6. Bids Shall Be Evaluated On An Equal Footing To Ensure Fair Competition. For This Purpose, All Bidders Shall Be Required To Include In Their Bids The Cost Of All Taxes, Such As, But Not Limited To, Value Added Tax (vat), Income Tax, Local Taxes, And Other Fiscal Levies And Duties Which Shall Be Itemized In The Bid Form And Reflected In The Detailed Estimates. Such Bids, Including Said Taxes, Shall Be The Basis For Bid Evaluation And Comparison. 28. Post Qualification 28.1. The Procuring Entity Shall Determine To Its Satisfaction Whether The Bidder That Is Evaluated As Having Submitted The Lowest Calculated Bid (lcb) Complies With And Is Responsive To All The Requirements And Conditions Specified In Itb Clauses 5, 12, And 13. 28.2. Within A Non-extendible Period Of Three (3) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lcb, The Bidder Shall Submit The Following Documentary Requirements: (a) Tax Clearance Per Executive Order 398, Series Of 2005; (b) Latest Income And Business Tax Returns In The Form Specified In The Bds; (c) Certificate Of Philgeps Registration; And (d) Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. Failure Of The Bidder Declared As Lcb To Duly Submit The Requirements Under This Clause Or A Finding Against The Veracity Of Such, Shall Be Ground For Forfeiture Of The Bid Security And Disqualification Of The Bidder For Award. 28.3. The Determination Shall Be Based Upon An Examination Of The Documentary Evidence Of The Bidder’s Qualifications Submitted Pursuant To Itb Clauses 12 And 13, As Well As Other Information As The Procuring Entity Deems Necessary And Appropriate, Using A Non-discretionary “pass/fail” Criterion. 28.4. If The Bac Determines That The Bidder With The Lowest Calculated Bid Passes All The Criteria For Post-qualification, It Shall Declare The Said Bid As The Lowest Calculated Responsive Bid, And Recommend To The Head Of The Procuring Entity The Award Of Contract To The Said Bidder At Its Submitted Price Or Its Calculated Bid Price, Whichever Is Lower, Subject To Itb Clause 30.3. 28.5. A Negative Determination Shall Result In Rejection Of The Bidder’s Bid, In Which Event The Procuring Entity Shall Proceed To The Next Lowest Calculated Bid To Make A Similar Determination Of That Bidder’s Capabilities To Perform Satisfactorily. If The Second Bidder, However, Fails The Post Qualification, The Procedure For Post Qualification Shall Be Repeated For The Bidder With The Next Lowest Calculated Bid, And So On Until The Lowest Calculated And Responsive Bid Is Determined For Contract Award. 28.6. Within A Period Not Exceeding Seven (7) Calendar Days From The Date Of Receipt Of The Recommendation Of The Bac, The Head Of The Procuring Entity Shall Approve Or Disapprove The Said Recommendation. In The Case Of Government Owned And Government-owned And/or -controlled Corporations (goccs) And Government Financial Institutions (gfis), The Period Provided Herein Shall Be Fifteen (15) Calendar Days. 29. Reservation Clause 29.1. Notwithstanding The Eligibility Or Post-qualification Of A Bidder, The Procuring Entity Concerned Reserves The Right To Review Its Qualifications At Any Stage Of The Procurement Process If It Has Reasonable Grounds To Believe That A Misrepresentation Has Been Made By The Said Bidder, Or That There Has Been A Change In The Bidder’s Capability To Undertake The Project From The Time It Submitted Its Eligibility Requirements. Should Such Review Uncover Any Misrepresentation Made In The Eligibility And Bidding Requirements, Statements Or Documents, Or Any Changes In The Situation Of The Bidder Which Will Affect Its Capability To Undertake The Project So That It Fails The Preset Eligibility Or Bid Evaluation Criteria, The Procuring Entity Shall Consider The Said Bidder As Ineligible And Shall Disqualify It From Submitting A Bid Or From Obtaining An Award Or Contract. 29.2. Based On The Following Grounds, The Procuring Entity Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding At Any Time Prior To The Contract Award, Or Not To Award The Contract, Without Thereby Incurring Any Liability, And Make No Assurance That A Contract Shall Be Entered Into As A Result Of The Bidding: (a) If There Is Prima Facie Evidence Of Collusion Between Appropriate Public Officers Or Employees Of The Procuring Entity, Or Between The Bac And Any Of The Bidders, Or If The Collusion Is Between Or Among The Bidders Themselves, Or Between A Bidder And A Third Party, Including Any Act Which Restricts, Suppresses Or Nullifies Or Tends To Restrict, Suppress Or Nullify Competition; (b) If The Procuring Entity’s Bac Is Found To Have Failed In Following The Prescribed Bidding Procedures; Or (c) For Any Justifiable And Reasonable Ground Where The Award Of The Contract Will Not Redound To The Benefit Of The Government As Follows: (i) If The Physical And Economic Conditions Have Significantly Changed So As To Render The Project No Longer Economically, Financially Or Technically Feasible As Determined By The Head Of The Procuring Entity; (ii) If The Project Is No Longer Necessary As Determined By The Head Of The Procuring Entity; And (iii) If The Source Of Funds For The Project Has Been Withheld Or Reduced Through No Fault Of The Procuring Entity. 29.3. In Addition, The Procuring Entity May Likewise Declare A Failure Of Bidding When: (a) No Bids Are Received; (b) All Prospective Bidders Are Declared Ineligible; (c) All Bids Fail To Comply With All The Bid Requirements Or Fail Post-qualification; Or (d) The Bidder With The Lowest Calculated Responsive Bid Refuses, Without Justifiable Cause To Accept The Award Of Contract, And No Award Is Made. F. Award Of Contract 30. Contract Award 30.1. Subject To Itb Clause 28, The Procuring Entity Shall Award The Contract To The Bidder Whose Bid Has Been Determined To Be The Lowest Calculated And Responsive Bid (lcrb). 30.2. Prior To The Expiration Of The Period Of Bid Validity, The Procuring Entity Shall Notify The Successful Bidder In Writing That Its Bid Has Been Accepted, Through A Notice Of Award Received Personally Or Sent By Registered Mail Or Electronically, Receipt Of Which Must Be Confirmed In Writing Within Two (2) Days By The Lcrb And Submitted Personally Or Sent By Registered Mail Or Electronically To The Procuring Entity. 30.3. Notwithstanding The Issuance Of The Notice Of Award, Award Of Contract Shall Be Subject To The Following Conditions: (a) Submission Of The Following Documents Within The Prescribed Period From Receipt By The Bidder Of The Notice That It Has The Lowest Calculated And Responsive Bid: (i) Valid Jva, If Applicable, Within Ten (10) Calendar Days; (ii) Valid Pcab License And Registration For The Type And Cost Of The Contract To Be Bid For Foreign Bidders, Within Thirty (30) Calendar Days, If Allowed Under A Treaty Or International Or Executive Agreement Mentioned In Itb Clause 12.1(a)(iv); (b) Posting Of The Performance Security In Accordance With Itb Clause 32; (c) Signing Of The Contract As Provided In Itb Clause 31; And (d) Approval By Higher Authority, If Required. 31. Signing Of The Contract 31.1. At The Same Time As The Procuring Entity Notifies The Successful Bidder That Its Bid Has Been Accepted, The Procuring Entity Shall Send The Contract Form To The Bidder, Which Contract Has Been Provided In The Bidding Documents, Incorporating Therein All Agreements Between The Parties. 31.2. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award, The Successful Bidder Shall Post The Required Performance Security, Sign And Date The Contract And Return It To The Procuring Entity. 31.3. The Procuring Entity Shall Enter Into Contract With The Successful Bidder Within The Same Ten (10) Calendar Day Period Provided That All The Documentary Requirements Are Complied With. 31.4. The Following Documents Shall Form Part Of The Contract: (a) Contract Agreement; (b) Bidding Documents; (c) Winning Bidder’s Bid, Including The Technical And Financial Proposals, And All Other Documents/statements Submitted; (d) Performance Security; (e) Credit Line In Accordance With Itb Clause 5.5, If Applicable; (f) Notice Of Award Of Contract; And (g) Other Contract Documents That May Be Required By Existing Laws And/or Specified In The Bds. 32. Performance Security 32.1. To Guarantee The Faithful Performance By The Winning Bidder Of Its Obligations Under The Contract, It Shall Post A Performance Security Within A Maximum Period Of Ten (10) Calendar Days From The Receipt Of The Notice Of Award From The Procuring Entity And In No Case Later Than The Signing Of The Contract. 32.2. The Performance Security Shall Be Denominated In Philippine Pesos And Posted In Favor Of The Procuring Entity In An Amount Equal To The Percentage Of The Total Contract Price As Stated In The Bds In Accordance With The Following Schedule: 33. 33.1. Form Of Performance Security Amount Of Performance Security (equal To Percentage Of The Total Contract Price) (a) Cash Or Cashier’s/manager’s Check Issued By A Universal Or Commercial Bank. Ten Percent (10%) (b) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank. (c) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security; And/or Thirty Percent (30%) (d) Any Combination Of The Foregoing. Proportionate To Share Of Form With Respect To Total Amount Of Security 33.2. Failure Of The Successful Bidder To Comply With The Above-mentioned Requirement Shall Constitute Sufficient Ground For The Annulment Of The Award And Forfeiture Of The Bid Security, In Which Event The Procuring Entity Shall Initiate And Complete The Post Qualification Of The Second Lowest Calculated Bid. The Procedure Shall Be Repeated Until The Lowest Calculated And Responsive Bid Is Identified And Selected For Contract Award. However If No Bidder Passed Post-qualification, The Bac Shall Declare The Bidding A Failure And Conduct A Re-bidding With Re-advertisement. 34. Notice To Proceed 34.1. Within Three (3) Calendar Days From The Date Of Approval Of The Contract By The Appropriate Government Approving Authority, The Procuring Entity Shall Issue Its Notice To Proceed To The Bidder. 34.2. The Contract Effectivity Date Shall Be Provided In The Notice To Proceed By The Procuring Entity, Which Date Shall Not Be Later Than Seven (7) Calendar Days From The Issuance Of The Notice To Proceed. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 1.1 The Procuring Entity Is Lgu- Mapanas, Northern Samar. The Name Of The Contract Is Rehabilitation / Improvement Of San Roque St. Barangay Sta. Potenciana, Mapanas N. Samar The Identification Number Of The Contract Is Pr No-2024-11-106__ 2 The Funding Source Is: 20% Economic Development Fund (edf) For Fy 2023. The Name Of The Project Is: Rehabilitation / Improvement Of San Roque St. Barangay Sta. Potenciana, Mapanas N. Samar 3.1 No Further Instructions. 5.1 No Further Instructions. 5.2 Bidding Is Restricted To Eligible Bidders As Defined In Itb Clause 5.1. 5.4 For This Purpose, Similar Contracts Shall Refer To Bidder’s Annual Turnover From All Works Average Over The Last Three Years Shall Be Equal To 50% Of The Estimated Cost Of The Contract Being Procured. The Bidder Must Have Completed, Within The Past Ten (10) Years From The Submission Of Bids, A Single Contract That Is Similar To This Project, Equivalent To At Least Eighty Percent (80%) Of The Abc. 8.1 “subcontracting Is Not Allowed.” 8.2 “not Applicable”. 9.1 The Procuring Entity Will Hold A Pre-bid Conference For This Project On December 05, 2024 At 10:00 A.m. At Executive Conference 2nd Floor Of New Municipal Bldg. Mapanas, Northern Samar. 10.1 The Procuring Entity’s Address Is: The Municipality Of Mapanas, Province Of Northern Samar Ma. Teresa L. Minguez Lgu-bac Chairperson Tel. No. 09778033758 10.3 No Further Instructions. 12.1 Not Applicable 12.1(a)(i) “no Other Acceptable Proof Of Registration Is Recognized.” 12.1(a)(iv) No Further Instructions. 13.1 “no Additional Requirements” 13.1(b) The Abc Is Php 998,750.33 Any Bid With A Financial Component Exceeding This Amount Shall Not Be Accepted. 14.2 “no Further Instructions.” 15.4 No Further Instruction. 16.1 The Bid Prices Shall Be Quoted In Philippine Pesos. 17.1 Bids Will Be Valid Until 120 Calendar Days After The Bid Submission Deadline Date As Prescribed By The Procuring Entity) 18.1 The Bid Security Shall Be In The Following Amount: 1. The Amount Of 19, 975.01 If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; 2. The Amount Of 49, 937.52 If Bid Security Is In Su Rety Bond; Or 3. Any Combination Of The Foregoing Proportionate To The Share Of Form With Respect To Total Amount Of Security. 18.2 The Bid Security Shall Be Valid Twenty Eight Days Beyond The Validity Period Of The Bid. 20.3 Each Bidder Shall Submit One Original And One Copy Of The First And Second Components Of Its Bid. 21 The Address For Submission Of Bids Is Ma. Teresa L. Minguez Lgu-bac Chairperson Bac Office @ Mpdo, 1st Floor, New Municipal Bldg. Municipality Of Mapanas, Northern Samar The Deadline For Submission Of Bids Is 9:00 A.m. On December 16 , 2024. 22 The Place Of Bid Opening Is Executive Conference Room, 2nd Floor, New Municipal Bldg. Municipality Of Mapanas, Northern Samar. The Date And Time Of Bid Opening Is December 16, 2024 At Exactly 10:00 A.m. 24.2 No Further Instructions. 27.3(b) Bid Modification Is Not Allowed. 27.4 No Further Instructions. 28.2(b) Bidders Have Option To Submit Manually Filed Tax Returns Or Tax Returns Filed Through The Electronic Filing And Payments System (efps). Note: The Latest Income And Business Tax Returns Are Those Within The Last Six Months Preceding The Date Of Bid Submission. 28.2(d) List Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It. 1. Taxpayer’s Identification Number 2. Vat Registration 3. Philippine Contractors Accreditation Board (pcab) License The Requirements Are Applicable Only In A Case Where The Lowest Calculated Bid (lcb) Is Submitted By A Domestic Bidder, And If The Lowest Calculated Bid (lcb) Is Submitted By A Foreign Bidder, This Requirements Are Not Applicable 31.4(g) List Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Department Of Labor And Employment, And Pert/cpm. 32.2 The Performance Security Shall Be In The Following Amount: 1. The Amount Of 10% Of Contract If Performance Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; 2. The Amount Of 30% Of Contract If Performance Security Is In Surety Bond; Or 3. Any Combination Of The Foregoing Proportionate To The Share Of Form With Respect To Total Amount Of Security. Section Iv. General Conditions Of Contract Table Of Contents 1. Definitions 41 2. Interpretation 43 3. Governing Language And Law 43 4. Communications 43 5. Possession Of Site 43 6. The Contractor’s Obligations 44 7. Performance Security 45 8. Subcontracting 46 9. Liquidated Damages 46 10. Site Investigation Reports 47 11. The Procuring Entity, Licenses And Permits 47 12. Contractor’s Risk And Warranty Security 47 13. Liability Of The Contractor 49 14. Procuring Entity’s Risk 49 15. Insurance 49 16. Termination For Default Of Contractor 51 17. Termination For Default Of Procuring Entity 51 18. Termination For Other Causes 52 19. Procedures For Termination Of Contracts 53 20. Force Majeure, Release From Performance 56 21. Resolution Of Disputes 56 22. Suspension Of Loan, Credit, Grant, Or Appropriation 57 23. Procuring Entity’s Representative’s Decisions 57 24. Approval Of Drawings And Temporary Works By The Procuring Entity’s Representative 57 25. Acceleration And Delays Ordered By The Procuring Entity’s Representative 58 26. Extension Of The Intended Completion Date 58 27. Right To Vary 58 28. Contractors Right To Claim 59 29. Dayworks 59 30. Early Warning 59 31. Program Of Work 59 32. Management Conferences 60 33. Bill Of Quantities 60 34. Instructions, Inspections And Audits 61 35. Identifying Defects 61 36. Cost Of Repairs 61 37. Correction Of Defects 61 38. Uncorrected Defects 62 39. Advance Payment 62 40. Progress Payments 62 41. Payment Certificates 63 42. Retention 63 43. Variation Orders 64 44. Contract Completion 66 45. Suspension Of Work 66 46. Payment On Termination 67 47. Extension Of Contract Time 67 48. Price Adjustment 68 49. Completion 68 50. Taking Over 69 51. Operating And Maintenance Manuals 69 1. Definitions For Purposes Of This Clause, Boldface Type Is Used To Identify Defined Terms. 1.1. The Arbiter Is The Person Appointed Jointly By The Procuring Entity And The Contractor To Resolve Disputes In The First Instance, As Provided For In Gcc Clause 21. 1.2. Bill Of Quantities Refers To A List Of The Specific Items Of The Work And Their Corresponding Unit Prices, Lump Sums, And/or Provisional Sums. 1.3. The Completion Date Is The Date Of Completion Of The Works As Certified By The Procuring Entity’s Representative, In Accordance With Gcc Clause 49. 1.4. The Contract Is The Contract Between The Procuring Entity And The Contractor To Execute, Complete, And Maintain The Works. 1.5. The Contract Price Is The Price Stated In The Letter Of Acceptance And Thereafter To Be Paid By The Procuring Entity To The Contractor For The Execution Of The Works In Accordance With This Contract. 1.6. Contract Time Extension Is The Allowable Period For The Contractor To Complete The Works In Addition To The Original Completion Date Stated In This Contract. 1.7. The Contractor Is The Juridical Entity Whose Proposal Has Been Accepted By The Procuring Entity And To Whom The Contract To Execute The Work Was Awarded. 1.8. The Contractor’s Bid Is The Signed Offer Or Proposal Submitted By The Contractor To The Procuring Entity In Response To The Bidding Documents. 1.9. Days Are Calendar Days; Months Are Calendar Months. 1.10. Dayworks Are Varied Work Inputs Subject To Payment On A Time Basis For The Contractor’s Employees And Equipment, In Addition To Payments For Associated Materials And Plant. 1.11. A Defect Is Any Part Of The Works Not Completed In Accordance With The Contract. 1.12. The Defects Liability Certificate Is The Certificate Issued By Procuring Entity’s Representative Upon Correction Of Defects By The Contractor. 1.13. The Defects Liability Period Is The One Year Period Between Contract Completion And Final Acceptance Within Which The Contractor Assumes The Responsibility To Undertake The Repair Of Any Damage To The Works At His Own Expense. 1.14. Drawings Are Graphical Presentations Of The Works. They Include All Supplementary Details, Shop Drawings, Calculations, And Other Information Provided Or Approved For The Execution Of This Contract. 1.15. Equipment Refers To All Facilities, Supplies, Appliances, Materials Or Things Required For The Execution And Completion Of The Work Provided By The Contractor And Which Shall Not Form Or Are Not Intended To Form Part Of The Permanent Works. 1.16. The Intended Completion Date Refers To The Date Specified In The Scc When The Contractor Is Expected To Have Completed The Works. The Intended Completion Date May Be Revised Only By The Procuring Entity’s Representative By Issuing An Extension Of Time Or An Acceleration Order. 1.17. Materials Are All Supplies, Including Consumables, Used By The Contractor For Incorporation In The Works. 1.18. The Notice To Proceed Is A Written Notice Issued By The Procuring Entity Or The Procuring Entity’s Representative To The Contractor Requiring The Latter To Begin The Commencement Of The Work Not Later Than A Specified Or Determinable Date. 1.19. Permanent Works All Permanent Structures And All Other Project Features And Facilities Required To Be Constructed And Completed In Accordance With This Contract Which Shall Be Delivered To The Procuring Entity And Which Shall Remain At The Site After The Removal Of All Temporary Works. 1.20. Plant Refers To The Machinery, Apparatus, And The Like Intended To Form An Integral Part Of The Permanent Works. 1.21. The Procuring Entity Is The Party Who Employs The Contractor To Carry Out The Works Stated In The Scc. 1.22. The Procuring Entity’s Representative Refers To The Head Of The Procuring Entity Or His Duly Authorized Representative, Identified In The Scc, Who Shall Be Responsible For Supervising The Execution Of The Works And Administering This Contract. 1.23. The Site Is The Place Provided By The Procuring Entity Where The Works Shall Be Executed And Any Other Place Or Places Which May Be Designated In The Scc, Or Notified To The Contractor By The Procuring Entity’s Representative As Forming Part Of The Site. 1.24. Site Investigation Reports Are Those That Were Included In The Bidding Documents And Are Factual And Interpretative Reports About The Surface And Subsurface Conditions At The Site. 1.25. Slippage Is A Delay In Work Execution Occurring When Actual Accomplishment Falls Below The Target As Measured By The Difference Between The Scheduled And Actual Accomplishment Of The Work By The Contractor As Established From The Work Schedule. This Is Actually Described As A Percentage Of The Whole Works. 1.26. Specifications Means The Description Of Works To Be Done And The Qualities Of Materials To Be Used, The Equipment To Be Installed And The Mode Of Construction. 1.27. The Start Date, As Specified In The Scc, Is The Date When The Contractor Is Obliged To Commence Execution Of The Works. It Does Not Necessarily Coincide With Any Of The Site Possession Dates. 1.28. A Subcontractor Is Any Person Or Organization To Whom A Part Of The Works Has Been Subcontracted By The Contractor, As Allowed By The Procuring Entity, But Not Any Assignee Of Such Person. 1.29. Temporary Works Are Works Designed, Constructed, Installed, And Removed By The Contractor That Are Needed For Construction Or Installation Of The Permanent Works. 1.30. Work(s)refer To The Permanent Works And Temporary Works To Be Executed By The Contractor In Accordance With This Contract, Including (i) The Furnishing Of All Labor, Materials, Equipment And Others Incidental, Necessary Or Convenient To The Complete Execution Of The Works; (ii) The Passing Of Any Tests Before Acceptance By The Procuring Entity’s Representative; (iii) And The Carrying Out Of All Duties And Obligations Of The Contractor Imposed By This Contract As Described In The Scc. 2. Interpretation 2.1. In Interpreting The Conditions Of Contract, Singular Also Means Plural, Male Also Means Female Or Neuter, And The Other Way Around. Headings Have No Significance. Words Have Their Normal Meaning Under The Language Of This Contract Unless Specifically Defined. The Procuring Entity’s Representative Will Provide Instructions Clarifying Queries About The Conditions Of Contract. 2.2. If Sectional Completion Is Specified In The Scc, References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Governing Language And Law 3.1. This Contract Has Been Executed In The English Language, Which Shall Be The Binding And Controlling Language For All Matters Relating To The Meaning Or Interpretation Of This Contract. All Correspondence And Other Documents Pertaining To This Contract Which Are Exchanged By The Parties Shall Be Written In English. 3.2. This Contract Shall Be Interpreted In Accordance With The Laws Of The Republic Of The Philippines. 4. Communications Communications Between Parties That Are Referred To In The Conditions Shall Be Effective Only When In Writing. A Notice Shall Be Effective Only When It Is Received By The Concerned Party. 5. Possession Of Site 5.1. On The Date Specified In The Scc, The Procuring Entity Shall Grant The Contractor Possession Of So Much Of The Site As May Be Required To Enable It To Proceed With The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 5.2. If Possession Of A Portion Is Not Given By The Date Stated In The Scc Clause 5.1, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contact Time To Address Such Delay Shall Be In Accordance With Gcc Clause 47. 5.3. The Contractor Shall Bear All Costs And Charges For Special Or Temporary Right-of-way Required By It In Connection With Access To The Site. The Contractor Shall Also Provide At His Own Cost Any Additional Facilities Outside The Site Required By It For Purposes Of The Works. 5.4. The Contractor Shall Allow The Procuring Entity’s Representative And Any Person Authorized By The Procuring Entity’s Representative Access To The Site And To Any Place Where Work In Connection With This Contract Is Being Carried Out Or Is Intended To Be Carried Out. 6. The Contractor’s Obligations 6.1. The Contractor Shall Carry Out The Works Properly And In Accordance With This Contract. The Contractor Shall Provide All Supervision, Labor, Materials, Plant And Contractor's Equipment, Which May Be Required. All Materials And Plant On Site Shall Be Deemed To Be The Property Of The Procuring Entity. 6.2. The Contractor Shall Commence Execution Of The Works On The Start Date And Shall Carry Out The Works In Accordance With The Program Of Work Submitted By The Contractor, As Updated With The Approval Of The Procuring Entity’s Representative, And Complete Them By The Intended Completion Date. 6.3. The Contractor Shall Be Responsible For The Safety Of All Activities On The Site. 6.4. The Contractor Shall Carry Out All Instructions Of The Procuring Entity’s Representative That Comply With The Applicable Laws Where The Site Is Located. 6.5. The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel, As Referred To In The Scc, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 6.6. If The Procuring Entity’s Representative Asks The Contractor To Remove A Member Of The Contractor’s Staff Or Work Force, For Justifiable Cause, The Contractor Shall Ensure That The Person Leaves The Site Within Seven (7) Days And Has No Further Connection With The Work In This Contract. 6.7. During Contract Implementation, The Contractor And His Subcontractors Shall Abide At All Times By All Labor Laws, Including Child Labor Related Enactments, And Other Relevant Rules. 6.8. The Contractor Shall Submit To The Procuring Entity For Consent The Name And Particulars Of The Person Authorized To Receive Instructions On Behalf Of The Contractor. 6.9. The Contractor Shall Cooperate And Share The Site With Other Contractors, Public Authorities, Utilities, And The Procuring Entity Between The Dates Given In The Schedule Of Other Contractors Particularly When They Shall Require Access To The Site. The Contractor Shall Also Provide Facilities And Services For Them During This Period. The Procuring Entity May Modify The Schedule Of Other Contractors, And Shall Notify The Contractor Of Any Such Modification Thereto. 6.10. Should Anything Of Historical Or Other Interest Or Of Significant Value Be Unexpectedly Discovered On The Site, It Shall Be The Property Of The Procuring Entity. The Contractor Shall Notify The Procuring Entity’s Representative Of Such Discoveries And Carry Out The Procuring Entity’s Representative’s Instructions In Dealing With Them. 7. Performance Security 7.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Contractor Shall Furnish The Performance Security In Any The Forms Prescribed In Itb Clause 32.2. 7.2. The Performance Security Posted In Favor Of The Procuring Entity Shall Be Forfeited In The Event It Is Established That The Contractor Is In Default In Any Of Its Obligations Under The Contract. 7.3. The Performance Security Shall Remain Valid Until Issuance By The Procuring Entity Of The Certificate Of Final Acceptance. 7.4. The Performance Security May Be Released By The Procuring Entity And Returned To The Contractor After The Issuance Of The Certificate Of Final Acceptance Subject To The Following Conditions: (a) There Are No Pending Claims Against The Contractor Or The Surety Company Filed By The Procuring Entity; (b) The Contractor Has No Pending Claims For Labor And Materials Filed Against It; And (c) Other Terms Specified In The Scc. 7.5. The Contractor Shall Post An Additional Performance Security Following The Amount And Form Specified In Itb Clause 32.2 To Cover Any Cumulative Increase Of More Than Ten Percent (10%) Over The Original Value Of The Contract As A Result Of Amendments To Order Or Change Orders, Extra Work Orders And Supplemental Agreements, As The Case May Be. The Contractor Shall Cause The Extension Of The Validity Of The Performance Security To Cover Approved Contract Time Extensions. 7.6. In Case Of A Reduction In The Contract Value Or For Partially Completed Works Under The Contract Which Are Usable And Accepted By The Procuring Entity The Use Of Which, In The Judgment Of The Implementing Agency Or The Procuring Entity, Will Not Affect The Structural Integrity Of The Entire Project, The Procuring Entity Shall Allow A Proportional Reduction In The Original Performance Security, Provided That Any Such Reduction Is More Than Ten Percent (10%) And That The Aggregate Of Such Reductions Is Not More Than Fifty Percent (50%) Of The Original Performance Security. 7.7. Unless Otherwise Indicated In The Scc, The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Act 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 8. Subcontracting 8.1. Unless Otherwise Indicated In The Scc, The Contractor Cannot Subcontract Works More Than The Percentage Specified In Itb Clause 8.1. 8.2. Subcontracting Of Any Portion Of The Works Does Not Relieve The Contractor Of Any Liability Or Obligation Under This Contract. The Contractor Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants Or Workmen. 8.3. Subcontractors Disclosed And Identified During The Bidding May Be Changed During The Implementation Of This Contract, Subject To Compliance With The Required Qualifications And The Approval Of The Procuring Entity. 9. Liquidated Damages 9.1. The Contractor Shall Pay Liquidated Damages To The Procuring Entity For Each Day That The Completion Date Is Later Than The Intended Completion Date. The Applicable Liquidated Damages Is At Least One-tenth (1/10) Of A Percent Of The Cost Of The Unperformed Portion For Every Day Of Delay. The Total Amount Of Liquidated Damages Shall Not Exceed Ten Percent (10%) Of The Amount Of The Contract. The Procuring Entity May Deduct Liquidated Damages From Payments Due To The Contractor. Payment Of Liquidated Damages Shall Not Affect The Contractor. Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of This Contract, The Procuring Entity Shall Rescind This Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. 9.2. If The Intended Completion Date Is Extended After Liquidated Damages Have Been Paid, The Engineer Of The Procuring Entity Shall Correct Any Overpayment Of Liquidated Damages By The Contractor By Adjusting The Next Payment Certificate. The Contractor Shall Be Paid Interest On The Overpayment, Calculated From The Date Of Payment To The Date Of Repayment, At The Rates Specified In Gcc Clause 40.3. 10. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 11. The Procuring Entity, Licenses And Permits The Procuring Entity Shall, If Requested By The Contractor, Assist Him In Applying For Permits, Licenses Or Approvals, Which Are Required For The Works. 12. Contractor’s Risk And Warranty Security 12.1. The Contractor Shall Assume Full Responsibility For The Works From The Time Project Construction Commenced Up To Final Acceptance By The Procuring Entity And Shall Be Held Responsible For Any Damage Or Destruction Of The Works Except Those Occasioned By Force Majeure. The Contractor Shall Be Fully Responsible For The Safety, Protection, Security, And Convenience Of His Personnel, Third Parties, And The Public At Large, As Well As The Works, Equipment, Installation, And The Like To Be Affected By His Construction Work. 12.2. The Defects Liability Period For Infrastructure Projects Shall Be One Year From Contract Completion Up To Final Acceptance By The Procuring Entity. During This Period, The Contractor Shall Undertake The Repair Works, At His Own Expense, Of Any Damage To The Works On Account Of The Use Of Materials Of Inferior Quality Within Ninety (90) Days From The Time The Head Of The Procuring Entity Has Issued An Order To Undertake Repair. In Case Of Failure Or Refusal To Comply With This Mandate, The Procuring Entity Shall Undertake Such Repair Works And Shall Be Entitled To Full Reimbursement Of Expenses Incurred Therein Upon Demand. 12.3. Unless Otherwise Indicated In The Scc, In Case The Contractor Fails To Comply With The Preceding Paragraph, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property (ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 12.4. After Final Acceptance Of The Works By The Procuring Entity, The Contractor Shall Be Held Responsible For “structural Defects”, I.e., Major Faults/flaws/deficiencies In One Or More Key Structural Elements Of The Project Which May Lead To Structural Failure Of The Completed Elements Or Structure, Or “structural Failures”, I.e., Where One Or More Key Structural Elements In An Infrastructure Facility Fails Or Collapses, Thereby Rendering The Facility Or Part Thereof Incapable Of Withstanding The Design Loads, And/or Endangering The Safety Of The Users Or The General Public: (a) Contractor – Where Structural Defects/failures Arise Due To Faults Attributable To Improper Construction, Use Of Inferior Quality/substandard Materials, And Any Violation Of The Contract Plans And Specifications, The Contractor Shall Be Held Liable; (b) Consultants – Where Structural Defects/failures Arise Due To Faulty And/or Inadequate Design And Specifications As Well As Construction Supervision, Then The Consultant Who Prepared The Design Or Undertook Construction Supervision For The Project Shall Be Held Liable; (c) Procuring Entity’s Representatives/project Manager/construction Managers And Supervisors – The Project Owner’s Representative(s), Project Manager, Construction Manager, And Supervisor(s) Shall Be Held Liable In Cases Where The Structural Defects/failures Are Due To His/their Willful Intervention In Altering The Designs And Other Specifications; Negligence Or Omission In Not Approving Or Acting On Proposed Changes To Noted Defects Or Deficiencies In The Design And/or Specifications; And The Use Of Substandard Construction Materials In The Project; (d) Third Parties - Third Parties Shall Be Held Liable In Cases Where Structural Defects/failures Are Caused By Work Undertaken By Them Such As Leaking Pipes, Diggings Or Excavations, Underground Cables And Electrical Wires, Underground Tunnel, Mining Shaft And The Like, In Which Case The Applicable Warranty To Such Structure Should Be Levied To Third Parties For Their Construction Or Restoration Works. (e) Users - In Cases Where Structural Defects/failures Are Due To Abuse/misuse By The End User Of The Constructed Facility And/or Non–compliance By A User With The Technical Design Limits And/or Intended Purpose Of The Same, Then The User Concerned Shall Be Held Liable. 12.5. The Warranty Against Structural Defects/failures, Except Those Occasioned On Force Majeure, Shall Cover The Period Specified In The Scc Reckoned From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. 12.6. The Contractor Shall Be Required To Put Up A Warranty Security In The Form Of Cash, Bank Guarantee, Letter Of Credit, Gsis Or Surety Bond Callable On Demand, In Accordance With The Following Schedule: Form Of Warranty Minimum Amount In Percentage (%) Of Total Contract Price (a) Cash Or Letter Of Credit Issued By Universal Or Commercial Bank: Provided, However, That The Letter Of Credit Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank Five Percent (5%) (b) Bank Guarantee Confirmed By Universal Or Commercial Bank: Provided, However, That The Letter Of Credit Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank Ten Percent (10%) (c) Surety Bond Callable Upon Demand Issued By Gsis Or Any Surety Or Insurance Company Duly Certified By The Insurance Commission Thirty Percent (30%) 12.7. The Warranty Security Shall Be Stated In Philippine Pesos And Shall Remain Effective For One Year From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity, And Returned Only After The Lapse Of Said One Year Period. 12.8. In Case Of Structural Defects/failure Occurring During The Applicable Warranty Period Provided In Gcc Clause 12.5, The Procuring Entity Shall Undertake The Necessary Restoration Or Reconstruction Works And Shall Be Entitled To Full Reimbursement By The Parties Found To Be Liable For Expenses Incurred Therein Upon Demand, Without Prejudice To The Filing Of Appropriate Administrative, Civil, And/or Criminal Charges Against The Responsible Persons As Well As The Forfeiture Of The Warranty Security Posted In Favor Of The Procuring Entity. 13. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. 14. Procuring Entity’s Risk 14.1. From The Start Date Until The Certificate Of Final Acceptance Has Been Issued, The Following Are Risks Of The Procuring Entity: (a) The Risk Of Personal Injury, Death, Or Loss Of Or Damage To Property (excluding The Works, Plant, Materials, And Equipment), Which Are Due To: (i) Any Type Of Use Or Occupation Of The Site Authorized By The Procuring Entity After The Official Acceptance Of The Works; Or (ii) Negligence, Breach Of Statutory Duty, Or Interference With Any Legal Right By The Procuring Entity Or By Any Person Employed By Or Contracted To Him Except The Contractor. (b) The Risk Of Damage To The Works, Plant, Materials, And Equipment To The Extent That It Is Due To A Fault Of The Procuring Entity Or In The Procuring Entity’s Design, Or Due To War Or Radioactive Contamination Directly Affecting The Country Where The Works Are To Be Executed. 15. Insurance 15.1. The Contractor Shall, Under His Name And At His Own Expense, Obtain And Maintain, For The Duration Of This Contract, The Following Insurance Coverage: (a) Contractor’s All Risk Insurance; (b) Transportation To The Project Site Of Equipment, Machinery, And Supplies Owned By The Contractor; (c) Personal Injury Or Death Of Contractor’s Employees; And (d) Comprehensive Insurance For Third Party Liability To Contractor’s Direct Or Indirect Act Or Omission Causing Damage To Third Persons. 15.2. The Contractor Shall Provide Evidence To The Procuring Entity’s Representative That The Insurances Required Under This Contract Have Been Effected And Shall, Within A Reasonable Time, Provide Copies Of The Insurance Policies To The Procuring Entity’s Representative. Such Evidence And Such Policies Shall Be Provided To The Procuring Entity’s Through The Procuring Entity’s Representative. 15.3. The Contractor Shall Notify The Insurers Of Changes In The Nature, Extent, Or Program For The Execution Of The Works And Ensure The Adequacy Of The Insurances At All Times In Accordance With The Terms Of This Contract And Shall Produce To The Procuring Entity’s Representative The Insurance Policies In Force Including The Receipts For Payment Of The Current Premiums. The Above Insurance Policies Shall Be Obtained From Any Reputable Insurance Company Approved By The Procuring Entity’s Representative. 15.4. If The Contractor Fails To Obtain And Keep In Force The Insurances Referred To Herein Or Any Other Insurance Which He May Be Required To Obtain Under The Terms Of This Contract, The Procuring Entity May Obtain And Keep In Force Any Such Insurances And Pay Such Premiums As May Be Necessary For The Purpose. From Time To Time, The Procuring Entity May Deduct The Amount It Shall Pay For Said Premiums Including Twenty Five Percent (25%) Therein From Any Monies Due, Or Which May Become Due, To The Contractor, Without Prejudice To The Procuring Entity Exercising Its Right To Impose Other Sanctions Against The Contractor Pursuant To The Provisions Of This Contract. 15.5. In The Event The Contractor Fails To Observe The Above Safeguards, The Procuring Entity May, At The Contractor’s Expense, Take Whatever Measure Is Deemed Necessary For Its Protection And That Of The Contractor’s Personnel And Third Parties, And/or Order The Interruption Of Dangerous Works. In Addition, The Procuring Entity May Refuse To Make The Payments Under Gcc Clause 40 Until The Contractor Complies With This Clause. 15.6. The Contractor Shall Immediately Replace The Insurance Policy Obtained As Required In This Contract, Without Need Of The Procuring Entity’s Demand, With A New Policy Issued By A New Insurance Company Acceptable To The Procuring Entity For Any Of The Following Grounds: (a) The Issuer Of The Insurance Policy To Be Replaced Has: (i) Become Bankrupt; (ii) Been Placed Under Receivership Or Under A Management Committee; (iii) Been Sued For Suspension Of Payment; Or (iv) Been Suspended By The Insurance Commission And Its License To Engage In Business Or Its Authority To Issue Insurance Policies Cancelled; Or (v) Where Reasonable Grounds Exist That The Insurer May Not Be Able, Fully And Promptly, To Fulfill Its Obligation Under The Insurance Policy. 16. Termination For Default Of Contractor 16.1. The Procuring Entity Shall Terminate This Contract For Default When Any Of The Following Conditions Attend Its Implementation: 16.2. Due To The Contractor’s Fault And While The Project Is On-going, It Has Incurred Negative Slippage Of Fifteen Percent (15%) Or More In Accordance With Presidential Decree 1870, Regardless Of Whether Or Not Previous Warnings And Notices Have Been Issued For The Contractor To Improve His Performance; 16.3. Due To Its Own Fault And After This Contract Time Has Expired, The Contractor Incurs Delay In The Completion Of The Work After This Contract Has Expired; Or 16.4. The Contractor: (a) Abandons The Contract Works, Refuses Or Fails To Comply With A Valid Instruction Of The Procuring Entity Or Fails To Proceed Expeditiously And Without Delay Despite A Written Notice By The Procuring Entity; (b) Does Not Actually Have On The Project Site The Minimum Essential Equipment Listed On The Bid Necessary To Prosecute The Works In Accordance With The Approved Program Of Work And Equipment Deployment Schedule As Required For The Project; (c) Does Not Execute The Works In Accordance With This Contract Or Persistently Or Flagrantly Neglects To Carry Out Its Obligations Under This Contract; (d) Neglects Or Refuses To Remove Materials Or To Perform A New Work That Has Been Rejected As Defective Or Unsuitable; Or (e) Sub-lets Any Part Of This Contract Without Approval By The Procuring Entity. 16.5. All Materials On The Site, Plant, Equipment, And Works Shall Be Deemed To Be The Property Of The Procuring Entity If This Contract Is Rescinded Because Of The Contractor’s Default. 17. Termination For Default Of Procuring Entity The Contractor May Terminate This Contract With The Procuring Entity If The Works Are Completely Stopped For A Continuous Period Of At Least Sixty (60) Calendar Days Through No Fault Of Its Own, Due To Any Of The Following Reasons: (a) Failure Of The Procuring Entity To Deliver, Within A Reasonable Time, Supplies, Materials, Right-of-way, Or Other Items It Is Obligated To Furnish Under The Terms Of This Contract; Or (b) The Prosecution Of The Work Is Disrupted By The Adverse Peace And Order Situation, As Certified By The Armed Forces Of The Philippines Provincial Commander And Approved By The Secretary Of National Defense. 18. Termination For Other Causes 18.1. The Procuring Entity May Terminate This Contract, In Whole Or In Part, At Any Time For Its Convenience. The Head Of The Procuring Entity May Terminate This Contract For The Convenience Of The Procuring Entity If He Has Determined The Existence Of Conditions That Make Project Implementation Economically, Financially Or Technically Impractical And/or Unnecessary, Such As, But Not Limited To, Fortuitous Event(s) Or Changes In Law And National Government Policies. 18.2. The Procuring Entity Or The Contractor May Terminate This Contract If The Other Party Causes A Fundamental Breach Of This Contract. 18.3. Fundamental Breaches Of Contract Shall Include, But Shall Not Be Limited To, The Following: (a) The Contractor Stops Work For Twenty Eight (28) Days When No Stoppage Of Work Is Shown On The Current Program Of Work And The Stoppage Has Not Been Authorized By The Procuring Entity’s Representative; (b) The Procuring Entity’s Representative Instructs The Contractor To Delay The Progress Of The Works, And The Instruction Is Not Withdrawn Within Twenty Eight (28) Days; (c) The Procuring Entity Shall Terminate This Contract If The Contractor Is Declared Bankrupt Or Insolvent As Determined With Finality By A Court Of Competent Jurisdiction. In This Event, Termination Will Be Without Compensation To The Contractor, Provided That Such Termination Will Not Prejudice Or Affect Any Right Of Action Or Remedy Which Has Accrued Or Will Accrue Thereafter To The Procuring Entity And/or The Contractor. In The Case Of The Contractor's Insolvency, Any Contractor's Equipment Which The Procuring Entity Instructs In The Notice Is To Be Used Until The Completion Of The Works; (d) A Payment Certified By The Procuring Entity’s Representative Is Not Paid By The Procuring Entity To The Contractor Within Eighty Four (84) Days From The Date Of The Procuring Entity’s Representative’s Certificate; (e) The Procuring Entity’s Representative Gives Notice That Failure To Correct A Particular Defect Is A Fundamental Breach Of Contract And The Contractor Fails To Correct It Within A Reasonable Period Of Time Determined By The Procuring Entity’s Representative; (f) The Contractor Does Not Maintain A Security, Which Is Required; (g) The Contractor Has Delayed The Completion Of The Works By The Number Of Days For Which The Maximum Amount Of Liquidated Damages Can Be Paid, As Defined In The Gcc Clause 9; And (h) In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To, The Following: (i) Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Defined In Itb Clause 3.1(a), Unless Otherwise Specified In The Scc; (ii) Drawing Up Or Using Forged Documents; (iii) Using Adulterated Materials, Means Or Methods, Or Engaging In Production Contrary To Rules Of Science Or The Trade; And (iv) Any Other Act Analogous To The Foregoing. 18.4. The Funding Source Or The Procuring Entity, As Appropriate, Will Seek To Impose The Maximum Civil, Administrative And/or Criminal Penalties Available Under The Applicable Law On Individuals And Organizations Deemed To Be Involved With Corrupt, Fraudulent, Or Coercive Practices. 18.5. When Persons From Either Party To This Contract Gives Notice Of A Fundamental Breach To The Procuring Entity’s Representative In Order To Terminate The Existing Contract For A Cause Other Than Those Listed Under Gcc Clause 18.3, The Procuring Entity’s Representative Shall Decide Whether The Breach Is Fundamental Or Not. 18.6. If This Contract Is Terminated, The Contractor Shall Stop Work Immediately, Make The Site Safe And Secure, And Leave The Site As Soon As Reasonably Possible. 19. Procedures For Termination Of Contracts 19.1. The Following Provisions Shall Govern The Procedures For The Termination Of This Contract: (a) Upon Receipt Of A Written Report Of Acts Or Causes Which May Constitute Ground(s) For Termination As Aforementioned, Or Upon Its Own Initiative, The Procuring Entity Shall, Within A Period Of Seven (7) Calendar Days, Verify The Existence Of Such Ground(s) And Cause The Execution Of A Verified Report, With All Relevant Evidence Attached; (b) Upon Recommendation By The Procuring Entity, The Head Of The Procuring Entity Shall Terminate This Contract Only By A Written Notice To The Contractor Conveying The Termination Of This Contract. The Notice Shall State: (i) That This Contract Is Being Terminated For Any Of The Ground(s) Afore-mentioned, And A Statement Of The Acts That Constitute The Ground(s) Constituting The Same; (ii) The Extent Of Termination, Whether In Whole Or In Part; (iii) An Instruction To The Contractor To Show Cause As To Why This Contract Should Not Be Terminated; And (iv) Special Instructions Of The Procuring Entity, If Any. The Notice To Terminate Shall Be Accompanied By A Copy Of The Verified Report; (c) Within A Period Of Seven (7) Calendar Days From Receipt Of The Notice Of Termination, The Contractor Shall Submit To The Head Of The Procuring Entity A Verified Position Paper Stating Why The Contract Should Not Be Terminated. If The Contractor Fails To Show Cause After The Lapse Of The Seven (7) Day Period, Either By Inaction Or By Default, The Head Of The Procuring Entity Shall Issue An Order Terminating The Contract; (d) The Procuring Entity May, At Anytime Before Receipt Of The Bidder’s Verified Position Paper Described In Item (c) Above Withdraw The Notice To Terminate If It Is Determined That Certain Items Or Works Subject Of The Notice Had Been Completed, Delivered, Or Performed Before The Contractor’s Receipt Of The Notice; (e) Within A Non-extendible Period Of Ten (10) Calendar Days From Receipt Of The Verified Position Paper, The Head Of The Procuring Entity Shall Decide Whether Or Not To Terminate This Contract. It Shall Serve A Written Notice To The Contractor Of Its Decision And, Unless Otherwise Provided In The Said Notice, This Contract Is Deemed Terminated From Receipt Of The Contractor Of The Notice Of Decision. The Termination Shall Only Be Based On The Ground(s) Stated In The Notice To Terminate; And (f) The Head Of The Procuring Entity May Create A Contract Termination Review Committee (ctrc) To Assist Him In The Discharge Of This Function. All Decisions Recommended By The Ctrc Shall Be Subject To The Approval Of The Head Of The Procuring Entity. 19.2. Pursuant To Section 69(f) Of Ra 9184 And Without Prejudice To The Imposition Of Additional Administrative Sanctions As The Internal Rules Of The Agency May Provide And/or Further Criminal Prosecution As Provided By Applicable Laws, The Procuring Entity Shall Impose On Contractors After The Termination Of The Contract The Penalty Of Suspension For One (1) Year For The First Offense, Suspension For Two (2) Years For The Second Offense From Participating In The Public Bidding Process, For Violations Committed During The Contract Implementation Stage, Which Include But Not Limited To The Following: (a) Failure Of The Contractor, Due Solely To His Fault Or Negligence, To Mobilize And Start Work Or Performance Within The Specified Period In The Notice To Proceed (“ntp”); (b) Failure By The Contractor To Fully And Faithfully Comply With Its Contractual Obligations Without Valid Cause, Or Failure By The Contractor To Comply With Any Written Lawful Instruction Of The Procuring Entity Or Its Representative(s) Pursuant To The Implementation Of The Contract. For The Procurement Of Infrastructure Projects Or Consultancy Contracts, Lawful Instructions Include But Are Not Limited To The Following: (i) Employment Of Competent Technical Personnel, Competent Engineers And/or Work Supervisors; (ii) Provision Of Warning Signs And Barricades In Accordance With Approved Plans And Specifications And Contract Provisions; (iii) Stockpiling In Proper Places Of All Materials And Removal From The Project Site Of Waste And Excess Materials, Including Broken Pavement And Excavated Debris In Accordance With Approved Plans And Specifications And Contract Provisions; (iv) Deployment Of Committed Equipment, Facilities, Support Staff And Manpower; And (v) Renewal Of The Effectivity Dates Of The Performance Security After Its Expiration During The Course Of Contract Implementation. (c) Assignment And Subcontracting Of The Contract Or Any Part Thereof Or Substitution Of Key Personnel Named In The Proposal Without Prior Written Approval By The Procuring Entity. (d) Poor Performance By The Contractor Or Unsatisfactory Quality And/or Progress Of Work Arising From His Fault Or Negligence As Reflected In The Constructor's Performance Evaluation System (“cpes”) Rating Sheet. In The Absence Of The Cpes Rating Sheet, The Existing Performance Monitoring System Of The Procuring Entity Shall Be Applied. Any Of The Following Acts By The Contractor Shall Be Construed As Poor Performance: (i) Negative Slippage Of 15% And Above Within The Critical Path Of The Project Due Entirely To The Fault Or Negligence Of The Contractor; And (ii) Quality Of Materials And Workmanship Not Complying With The Approved Specifications Arising From The Contractor's Fault Or Negligence. (e) Willful Or Deliberate Abandonment Or Non-performance Of The Project Or Contract By The Contractor Resulting To Substantial Breach Thereof Without Lawful And/or Just Cause. In Addition To The Penalty Of Suspension, The Performance Security Posted By The Contractor Shall Also Be Forfeited. 20. Force Majeure, Release From Performance 20.1. For Purposes Of This Contract The Terms “force Majeure” And “fortuitous Event” May Be Used Interchangeably. In This Regard, A Fortuitous Event Or Force Majeure Shall Be Interpreted To Mean An Event Which The Contractor Could Not Have Foreseen, Or Which Though Foreseen, Was Inevitable. It Shall Not Include Ordinary Unfavorable Weather Conditions; And Any Other Cause The Effects Of Which Could Have Been Avoided With The Exercise Of Reasonable Diligence By The Contractor. 20.2. If This Contract Is Discontinued By An Outbreak Of War Or By Any Other Event Entirely Outside The Control Of Either The Procuring Entity Or The Contractor, The Procuring Entity’s Representative Shall Certify That This Contract Has Been Discontinued. The Contractor Shall Make The Site Safe And Stop Work As Quickly As Possible After Receiving This Certificate And Shall Be Paid For All Works Carried Out Before Receiving It And For Any Work Carried Out Afterwards To Which A Commitment Was Made. 20.3. If The Event Continues For A Period Of Eighty Four (84) Days, Either Party May Then Give Notice Of Termination, Which Shall Take Effect Twenty Eight (28) Days After The Giving Of The Notice. 20.4. After Termination, The Contractor Shall Be Entitled To Payment Of The Unpaid Balance Of The Value Of The Works Executed And Of The Materials And Plant Reasonably Delivered To The Site, Adjusted By The Following: (a) Any Sum To Which The Contractor Is Entitled Under Gcc Clause 28; (b) The Cost Of His Suspension And Demobilization; (c) Any Sum To Which The Procuring Entity Is Entitled. 20.5. The Net Balance Due Shall Be Paid Or Repaid Within A Reasonable Time Period From The Time Of The Notice Of Termination. 21. Resolution Of Disputes 21.1. If Any Dispute Or Difference Of Any Kind Whatsoever Shall Arise Between The Parties In Connection With The Implementation Of The Contract Covered By The Act And This Irr, The Parties Shall Make Every Effort To Resolve Amicably Such Dispute Or Difference By Mutual Consultation. 21.2. If The Contractor Believes That A Decision Taken By The Procuring Entity’s Representative Was Either Outside The Authority Given To The Procuring Entity’s Representative By This Contract Or That The Decision Was Wrongly Taken, The Decision Shall Be Referred To The Arbiter Indicated In The Scc Within Fourteen (14) Days Of The Notification Of The Procuring Entity’s Representative’s Decision. 21.3. Any And All Disputes Arising From The Implementation Of This Contract Covered By The R.a. 9184 And Its Irr Shall Be Submitted To Arbitration In The Philippines According To The Provisions Of Republic Act No. 876, Otherwise Known As The “ Arbitration Law” And Republic Act 9285, Otherwise Known As The “alternative Dispute Resolution Act Of 2004”: Provided, However, That, Disputes That Are Within The Competence Of The Construction Industry Arbitration Commission To Resolve Shall Be Referred Thereto. The Process Of Arbitration Shall Be Incorporated As A Provision In This Contract That Will Be Executed Pursuant To The Provisions Of The Act And Its Irr: Provided, Further, That, By Mutual Agreement, The Parties May Agree In Writing To Resort To Other Alternative Modes Of Dispute Resolution. 22. Suspension Of Loan, Credit, Grant, Or Appropriation In The Event That The Funding Source Suspends The Loan, Credit, Grant, Or Appropriation To The Procuring Entity, From Which Part Of The Payments To The Contractor Are Being Made: (a) The Procuring Entity Is Obligated To Notify The Contractor Of Such Suspension Within Seven (7) Days Of Having Received The Suspension Notice. (b) If The Contractor Has Not Received Sums Due It For Work Already Done Within Forty Five (45) Days From The Time The Contractor’s Claim For Payment Has Been Certified By The Procuring Entity’s Representative, The Contractor May Immediately Issue A Suspension Of Work Notice In Accordance With Gcc Clause 45.2. 23. Procuring Entity’s Representative’s Decisions 23.1. Except Where Otherwise Specifically Stated, The Procuring Entity’s Representative Will Decide Contractual Matters Between The Procuring Entity And The Contractor In The Role Representing The Procuring Entity. 23.2. The Procuring Entity’s Representative May Delegate Any Of His Duties And Responsibilities To Other People, Except To The Arbiter, After Notifying The Contractor, And May Cancel Any Delegation After Notifying The Contractor. 24. Approval Of Drawings And Temporary Works By The Procuring Entity’s Representative 24.1. All Drawings Prepared By The Contractor For The Execution Of The Temporary Works, Are Subject To Prior Approval By The Procuring Entity’s Representative Before Its Use. 24.2. The Contractor Shall Be Responsible For Design Of Temporary Works. 24.3. The Procuring Entity’s Representative’s Approval Shall Not Alter The Contractor’s Responsibility For Design Of The Temporary Works. 24.4. The Contractor Shall Obtain Approval Of Third Parties To The Design Of The Temporary Works, When Required By The Procuring Entity. 25. Acceleration And Delays Ordered By The Procuring Entity’s Representative 25.1. When The Procuring Entity Wants The Contractor To Finish Before The Intended Completion Date, The Procuring Entity’s Representative Will Obtain Priced Proposals For Achieving The Necessary Acceleration From The Contractor. If The Procuring Entity Accepts These Proposals, The Intended Completion Date Will Be Adjusted Accordingly And Confirmed By Both The Procuring Entity And The Contractor. 25.2. If The Contractor’s Financial Proposals For An Acceleration Are Accepted By The Procuring Entity, They Are Incorporated In The Contract Price And Treated As A Variation. 26. Extension Of The Intended Completion Date 26.1. The Procuring Entity’s Representative Shall Extend The Intended Completion Date If A Variation Is Issued Which Makes It Impossible For The Intended Completion Date To Be Achieved By The Contractor Without Taking Steps To Accelerate The Remaining Work, Which Would Cause The Contractor To Incur Additional Costs. No Payment Shall Be Made For Any Event Which May Warrant The Extension Of The Intended Completion Date. 26.2. The Procuring Entity’s Representative Shall Decide Whether And By How Much To Extend The Intended Completion Date Within Twenty One (21) Days Of The Contractor Asking The Procuring Entity’s Representative For A Decision Thereto After Fully Submitting All Supporting Information. If The Contractor Has Failed To Give Early Warning Of A Delay Or Has Failed To Cooperate In Dealing With A Delay, The Delay By This Failure Shall Not Be Considered In Assessing The New Intended Completion Date. 27. Right To Vary 27.1. The Procuring Entity’s Representative With The Prior Approval Of The Procuring Entity May Instruct Variations, Up To A Maximum Cumulative Amount Of Ten Percent (10%) Of The Original Contract Cost. 27.2. Variations Shall Be Valued As Follows: (a) At A Lump Sum Price Agreed Between The Parties; (b) Where Appropriate, At Rates In This Contract; (c) In The Absence Of Appropriate Rates, The Rates In This Contract Shall Be Used As The Basis For Valuation; Or Failing Which (d) At Appropriate New Rates, Equal To Or Lower Than Current Industry Rates And To Be Agreed Upon By Both Parties And Approved By The Head Of The Procuring Entity. 28. Contractor's Right To Claim If The Contractor Incurs Cost As A Result Of Any Of The Events Under Gcc Clause 13, The Contractor Shall Be Entitled To The Amount Of Such Cost. If As A Result Of Any Of The Said Events, It Is Necessary To Change The Works, This Shall Be Dealt With As A Variation. 29. Dayworks 29.1. Subject To Gcc Clause 43 On Variation Order, And If Applicable As Indicated In The Scc, The Day Works Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 29.2. All Work To Be Paid For As Day Works Shall Be Recorded By The Contractor On Forms Approved By The Procuring Entity’s Representative. Each Completed Form Shall Be Verified And Signed By The Procuring Entity’s Representative Within Two Days Of The Work Being Done. 29.3. The Contractor Shall Be Paid For Day Works Subject To Obtaining Signed Dayworks Forms. 30. Early Warning 30.1. The Contractor Shall Warn The Procuring Entity’s Representative At The Earliest Opportunity Of Specific Likely Future Events Or Circumstances That May Adversely Affect The Quality Of The Work, Increase The Contract Price, Or Delay The Execution Of The Works. The Procuring Entity’s Representative May Require The Contractor To Provide An Estimate Of The Expected Effect Of The Future Event Or Circumstance On The Contract Price And Completion Date. The Estimate Shall Be Provided By The Contractor As Soon As Reasonably Possible. 30.2. The Contractor Shall Cooperate With The Procuring Entity’s Representative In Making And Considering Proposals For How The Effect Of Such An Event Or Circumstance Can Be Avoided Or Reduced By Anyone Involved In The Work And In Carrying Out Any Resulting Instruction Of The Procuring Entity’s Representative. 31. Program Of Work 31.1. Within The Time Stated In The Scc, The Contractor Shall Submit To The Procuring Entity’s Representative For Approval A Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. 31.2. An Update Of The Program Of Work Shall The Show The Actual Progress Achieved On Each Activity And The Effect Of The Progress Achieved On The Timing Of The Remaining Work, Including Any Changes To The Sequence Of The Activities. 31.3. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 31.4. The Procuring Entity’s Representative’s Approval Of The Program Of Work Shall Not Alter The Contractor’s Obligations. The Contractor May Revise The Program Of Work And Submit It To The Procuring Entity’s Representative Again At Any Time. A Revised Program Of Work Shall Show The Effect Of Any Approved Variations. 31.5. When The Program Of Work Is Updated, The Contractor Shall Provide The Procuring Entity’s Representative With An Updated Cash Flow Forecast. The Cash Flow Forecast Shall Include Different Currencies, As Defined In The Contract, Converted As Necessary Using The Contract Exchange Rates. 31.6. All Variations Shall Be Included In Updated Program Of Work Produced By The Contractor. 32. Management Conferences 32.1. Either The Procuring Entity’s Representative Or The Contractor May Require The Other To Attend A Management Conference. The Management Conference Shall Review The Plans For Remaining Work And Deal With Matters Raised In Accordance With The Early Warning Procedure. 32.2. The Procuring Entity’s Representative Shall Record The Business Of Management Conferences And Provide Copies Of The Record To Those Attending The Conference And To The Procuring Entity . The Responsibility Of The Parties For Actions To Be Taken Shall Be Decided By The Procuring Entity’s Representative Either At The Management Conference Or After The Management Conference And Stated In Writing To All Who Attended The Conference. 33. Bill Of Quantities 33.1. The Bill Of Quantities Shall Contain Items Of Work For The Construction, Installation, Testing, And Commissioning Of Work To Be Done By The Contractor. 33.2. The Bill Of Quantities Is Used To Calculate The Contract Price. The Contractor Is Paid For The Quantity Of The Work Done At The Rate In The Bill Of Quantities For Each Item. 33.3. If The Final Quantity Of Any Work Done Differs From The Quantity In The Bill Of Quantities For The Particular Item And Is Not More Than Twenty Five Percent (25%) Of The Original Quantity, Provided The Aggregate Changes For All Items Do Not Exceed Ten Percent (10%) Of The Contract Price, The Procuring Entity’s Representative Shall Make The Necessary Adjustments To Allow For The Changes Subject To Applicable Laws, Rules, And Regulations. 33.4. If Requested By The Procuring Entity’s Representative, The Contractor Shall Provide The Procuring Entity’s Representative With A Detailed Cost Breakdown Of Any Rate In The Bill Of Quantities. 34. Instructions, Inspections And Audits 34.1. The Procuring Entity’s Personnel Shall At All Reasonable Times During Construction Of The Work Be Entitled To Examine, Inspect, Measure And Test The Materials And Workmanship, And To Check The Progress Of The Construction. 34.2. If The Procuring Entity’s Representative Instructs The Contractor To Carry Out A Test Not Specified In The Specification To Check Whether Any Work Has A Defect And The Test Shows That It Does, The Contractor Shall Pay For The Test And Any Samples. If There Is No Defect, The Test Shall Be A Compensation Event. 34.3. The Contractor Shall Permit The Funding Source Named In The Scc To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Appointed By The Funding Source, If So Required By The Funding Source. 35. Identifying Defects The Procuring Entity’s Representative Shall Check The Contractor’s Work And Notify The Contractor Of Any Defects That Are Found. Such Checking Shall Not Affect The Contractor’s Responsibilities. The Procuring Entity’s Representative May Instruct The Contractor To Search Uncover Defects And Test Any Work That The Procuring Entity’s Representative Considers Below Standards And Defective. 36. Cost Of Repairs Loss Or Damage To The Works Or Materials To Be Incorporated In The Works Between The Start Date And The End Of The Defects Liability Periods Shall Be Remedied By The Contractor At The Contractor’s Cost If The Loss Or Damage Arises From The Contractor’s Acts Or Omissions. 37. Correction Of Defects 37.1. The Procuring Entity’s Representative Shall Give Notice To The Contractor Of Any Defects Before The End Of The Defects Liability Period, Which Isone (1) Year From Project Completion Up To Final Acceptance By The Procuring Entity’s. 37.2. Every Time Notice Of A Defect Is Given, The Contractor Shall Correct The Notified Defect Within The Length Of Time Specified In The Procuring Entity’s Representative’s Notice. 37.3. The Contractor Shall Correct The Defects Which He Notices Himself Before The End Of The Defects Liability Period. 37.4. The Procuring Entity Shall Certify That All Defects Have Been Corrected. If The Procuring Entity Considers That Correction Of A Defect Is Not Essential, He Can Request The Contractor To Submit A Quotation For The Corresponding Reduction In The Contract Price. If The Procuring Entity Accepts The Quotation, The Corresponding Change In The Scc Is A Variation. 38. Uncorrected Defects 38.1. The Procuring Entity Shall Give The Contractor At Least Fourteen (14) Days Notice Of His Intention To Use A Third Party To Correct A Defect. If The Contractor Does Not Correct The Defect Himself Within The Period, The Procuring Entity May Have The Defect Corrected By The Third Party. The Cost Of The Correction Will Be Deducted From The Contract Price. 38.2. The Use Of A Third Party To Correct Defects That Are Uncorrected By The Contractor Will In No Way Relieve The Contractor Of Its Liabilities And Warranties Under The Contract. 39. Advance Payment 39.1. The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum Or, At The Most Two, Installments According To A Schedule Specified In The Scc. 39.2. The Advance Payment Shall Be Made Only Upon The Submission To And Acceptance By The Procuring Entity Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, A Bank Guarantee Or A Surety Bond Callable Upon Demand, Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission And Confirmed By The Procuring Entity. 39.3. The Advance Payment Shall Be Repaid By The Contractor By An Amount Equal To The Percentage Of The Total Contract Price Used For The Advance Payment. 39.4. The Contractor May Reduce His Standby Letter Of Credit Or Guarantee Instrument By The Amounts Refunded By The Monthly Certificates In The Advance Payment. 39.5. The Procuring Entity Will Provide An Advance Payment On The Contract Price As Stipulated In The Conditions Of Contract, Subject To The Maximum Amount Stated In Scc Clause 39.1. 40. Progress Payments 40.1. The Contractor May Submit A Request For Payment For Work Accomplished. Such Request For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 40.2. The Procuring Entity Shall Deduct The Following From The Certified Gross Amounts To Be Paid To The Contractor As Progress Payment: (a) Cumulative Value Of The Work Previously Certified And Paid For. (b) Portion Of The Advance Payment To Be Recouped For The Month. (c) Retention Money In Accordance With The Condition Of Contract. (d) Amount To Cover Third Party Liabilities. (e) Amount To Cover Uncorrected Discovered Defects In The Works. 40.3. Payments Shall Be Adjusted By Deducting There From The Amounts For Advance Payments And Retention. The Procuring Entity Shall Pay The Contractor The Amounts Certified By The Procuring Entity’s Representative Within Twenty Eight (28) Days From The Date Each Certificate Was Issued. No Payment Of Interest For Delayed Payments And Adjustments Shall Be Made By The Procuring Entity. 40.4. The First Progress Payment May Be Paid By The Procuring Entity To The Contractor Provided That At Least Twenty Percent (20%) Of The Work Has Been Accomplished As Certified By The Procuring Entity’s Representative. 40.5. Items Of The Works For Which A Price Of “0” (zero) Has Been Entered Will Not Be Paid For By The Procuring Entity And Shall Be Deemed Covered By Other Rates And Prices In The Contract. 41. Payment Certificates 41.1. The Contractor Shall Submit To The Procuring Entity’s Representative Monthly Statements Of The Estimated Value Of The Work Executed Less The Cumulative Amount Certified Previously. 41.2. The Procuring Entity’s Representative Shall Check The Contractor’s Monthly Statement And Certify The Amount To Be Paid To The Contractor. 41.3. The Value Of Work Executed Shall: (a) Be Determined By The Procuring Entity’s Representative; (b) Comprise The Value Of The Quantities Of The Items In The Bill Of Quantities Completed; And (c) Include The Valuations Of Approved Variations. 41.4. The Procuring Entity’s Representative May Exclude Any Item Certified In A Previous Certificate Or Reduce The Proportion Of Any Item Previously Certified In Any Certificate In The Light Of Later Information. 42. Retention 42.1. The Procuring Entity Shall Retain From Each Payment Due To The Contractor An Amount Equal To A Percentage Thereof Using The Rate As Specified In Itb Sub-clause 42.2. 42.2. Progress Payments Are Subject To Retention Of Ten Percent (10%), Referred To As The “retention Money.” Such Retention Shall Be Based On The Total Amount Due To The Contractor Prior To Any Deduction And Shall Be Retained From Every Progress Payment Until Fifty Percent (50%) Of The Value Of Works, As Determined By The Procuring Entity, Are Completed. If, After Fifty Percent (50%) Completion, The Work Is Satisfactorily Done And On Schedule, No Additional Retention Shall Be Made; Otherwise, The Ten Percent (10%) Retention Shall Again Be Imposed Using The Rate Specified Therefore. 42.3. The Total “retention Money” Shall Be Due For Release Upon Final Acceptance Of The Works. The Contractor May, However, Request The Substitution Of The Retention Money For Each Progress Billing With Irrevocable Standby Letters Of Credit From A Commercial Bank, Bank Guarantees Or Surety Bonds Callable On Demand, Of Amounts Equivalent To The Retention Money Substituted For And Acceptable To The Procuring Entity, Provided That The Project Is On Schedule And Is Satisfactorily Undertaken. Otherwise, The Ten (10%) Percent Retention Shall Be Made. Said Irrevocable Standby Letters Of Credit, Bank Guarantees And/or Surety Bonds, To Be Posted In Favor Of The Government Shall Be Valid For A Duration To Be Determined By The Concerned Implementing Office/agency Or Procuring Entity And Will Answer For The Purpose For Which The Ten (10%) Percent Retention Is Intended, I.e., To Cover Uncorrected Discovered Defects And Third Party Liabilities. 42.4. On Completion Of The Whole Works, The Contractor May Substitute Retention Money With An “on Demand” Bank Guarantee In A Form Acceptable To The Procuring Entity. 43. Variation Orders 43.1. Variation Orders May Be Issued By The Procuring Entity To Cover Any Increase/decrease In Quantities, Including The Introduction Of New Work Items That Are Not Included In The Original Contract Or Reclassification Of Work Items That Are Either Due To Change Of Plans, Design Or Alignment To Suit Actual Field Conditions Resulting In Disparity Between The Preconstruction Plans Used For Purposes Of Bidding And The “as Staked Plans” Or Construction Drawings Prepared After A Joint Survey By The Contractor And The Procuring Entity After Award Of The Contract, Provided That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. The Addition/deletion Of Works Should Be Within The General Scope Of The Project As Bid And Awarded. The Scope Of Works Shall Not Be Reduced So As To Accommodate A Positive Variation Order. A Variation Order May Either Be In The Form Of A Change Order Or Extra Work Order. 43.2. A Change Order May Be Issued By The Procuring Entity To Cover Any Increase/decrease In Quantities Of Original Work Items In The Contract. 43.3. An Extra Work Order May Be Issued By The Procuring Entity To Cover The Introduction Of New Work Necessary For The Completion, Improvement Or Protection Of The Project Which Were Not Included As Items Of Work In The Original Contract, Such As, Where There Are Subsurface Or Latent Physical Conditions At The Site Differing Materially From Those Indicated In The Contract, Or Where There Are Duly Unknown Physical Conditions At The Site Of An Unusual Nature Differing Materially From Those Ordinarily Encountered And Generally Recognized As Inherent In The Work Or Character Provided For In The Contract. 43.4. Any Cumulative Variation Order Beyond Ten Percent (10%) Shall Be Subject Of Another Contract To Be Bid Out If The Works Are Separable From The Original Contract. In Exceptional Cases Where It Is Urgently Necessary To Complete The Original Scope Of Work, The Head Of The Procuring Entity May Authorize A Positive Variation Order Go Beyond Ten Percent (10%) But Not More Than Twenty Percent (20%) Of The Original Contract Price, Subject To The Guidelines To Be Determined By The Gppb: Provided, However, That Appropriate Sanctions Shall Be Imposed On The Designer, Consultant Or Official Responsible For The Original Detailed Engineering Design Which Failed To Consider The Variation Order Beyond Ten Percent (10%). 43.5. In Claiming For Any Variation Order, The Contractor Shall, Within Seven (7) Calendar Days After Such Work Has Been Commenced Or After The Circumstances Leading To Such Condition(s) Leading To The Extra Cost, And Within Twenty-eight (28) Calendar Days Deliver A Written Communication Giving Full And Detailed Particulars Of Any Extra Cost In Order That It May Be Investigated At That Time. Failure To Provide Either Of Such Notices In The Time Stipulated Shall Constitute A Waiver By The Contractor For Any Claim. The Preparation And Submission Of Variation Orders Are As Follows: (a) If The Procuring Entity’s Representative/project Engineer Believes That A Change Order Or Extra Work Order Should Be Issued, He Shall Prepare The Proposed Order Accompanied With The Notices Submitted By The Contractor, The Plans Therefore, His Computations As To The Quantities Of The Additional Works Involved Per Item Indicating The Specific Stations Where Such Works Are Needed, The Date Of His Inspections And Investigations Thereon, And The Log Book Thereof, And A Detailed Estimate Of The Unit Cost Of Such Items Of Work, Together With His Justifications For The Need Of Such Change Order Or Extra Work Order, And Shall Submit The Same To The Head Of The Procuring Entity For Approval. (b) The Head Of The Procuring Entity Or His Duly Authorized Representative, Upon Receipt Of The Proposed Change Order Or Extra Work Order Shall Immediately Instruct The Technical Staff Of The Procuring Entity’s To Conduct An On-the-spot Investigation To Verify The Need For The Work To Be Prosecuted. A Report Of Such Verification Shall Be Submitted Directly To The Head Of The Procuring Entity Or His Duly Authorized Representative. (c) The, Head Of The Procuring Entity Or His Duly Authorized Representative, After Being Satisfied That Such Change Order Or Extra Work Order Is Justified And Necessary, Shall Review The Estimated Quantities And Prices And Forward The Proposal With The Supporting Documentation To The Head Of Procuring Entity For Consideration. (d) If, After Review Of The Plans, Quantities And Estimated Unit Cost Of The Items Of Work Involved, The Proper Office Of The Procuring Entity Empowered To Review And Evaluate Change Orders Or Extra Work Orders Recommends Approval Thereof, Head Of The Procuring Entity Or His Duly Authorized Representative, Believing The Change Order Or Extra Work Order To Be In Order, Shall Approve The Same. (e) The Timeframe For The Processing Of Variation Orders From The Preparation Up To The Approval By The Head Of The Procuring Entity Concerned Shall Not Exceed Thirty (30) Calendar Days. 44. Contract Completion Once The Project Reaches An Accomplishment Of Ninety Five (95%) Of The Total Contract Amount, The Procuring Entity May Create An Inspectorate Team To Make Preliminary Inspection And Submit A Punch-list To The Contractor In Preparation For The Final Turnover Of The Project. Said Punch-list Will Contain, Among Others, The Remaining Works, Work Deficiencies For Necessary Corrections, And The Specific Duration/time To Fully Complete The Project Considering The Approved Remaining Contract Time. This, However, Shall Not Preclude The Claim Of The Procuring Entity For Liquidated Damages. 45. Suspension Of Work 45.1. The Procuring Entity Shall Have The Authority To Suspend The Work Wholly Or Partly By Written Order For Such Period As May Be Deemed Necessary, Due To Force Majeure Or Any Fortuitous Events Or For Failure On The Part Of The Contractor To Correct Bad Conditions Which Are Unsafe For Workers Or For The General Public, To Carry Out Valid Orders Given By The Procuring Entity Or To Perform Any Provisions Of The Contract, Or Due To Adjustment Of Plans To Suit Field Conditions As Found Necessary During Construction. The Contractor Shall Immediately Comply With Such Order To Suspend The Work Wholly Or Partly. 45.2. The Contractor Or Its Duly Authorized Representative Shall Have The Right To Suspend Work Operation On Any Or All Projects/activities Along The Critical Path Of Activities After Fifteen (15) Calendar Days From Date Of Receipt Of Written Notice From The Contractor To The District Engineer/regional Director/consultant Or Equivalent Official, As The Case May Be, Due To The Following: (a) There Exist Right-of-way Problems Which Prohibit The Contractor From Performing Work In Accordance With The Approved Construction Schedule. (b) Requisite Construction Plans Which Must Be Owner-furnished Are Not Issued To The Contractor Precluding Any Work Called For By Such Plans. (c) Peace And Order Conditions Make It Extremely Dangerous, If Not Possible, To Work. However, This Condition Must Be Certified In Writing By The Philippine National Police (pnp) Station Which Has Responsibility Over The Affected Area And Confirmed By The Department Of Interior And Local Government (dilg) Regional Director. (d) There Is Failure On The Part Of The Procuring Entity To Deliver Government-furnished Materials And Equipment As Stipulated In The Contract. (e) Delay In The Payment Of Contractor’s Claim For Progress Billing Beyond Forty-five (45) Calendar Days From The Time The Contractor’s Claim Has Been Certified To By The Procuring Entity’s Authorized Representative That The Documents Are Complete Unless There Are Justifiable Reasons Thereof Which Shall Be Communicated In Writing To The Contractor. 45.3. In Case Of Total Suspension, Or Suspension Of Activities Along The Critical Path, Which Is Not Due To Any Fault Of The Contractor, The Elapsed Time Between The Effective Order Of Suspending Operation And The Order To Resume Work Shall Be Allowed The Contractor By Adjusting The Contract Time Accordingly. 46. Payment On Termination 46.1. If The Contract Is Terminated Because Of A Fundamental Breach Of Contract By The Contractor, The Procuring Entity’s Representative Shall Issue A Certificate For The Value Of The Work Done And Materials Ordered Less Advance Payments Received Up To The Date Of The Issue Of The Certificate And Less The Percentage To Apply To The Value Of The Work Not Completed, As Indicated In The Scc. Additional Liquidated Damages Shall Not Apply. If The Total Amount Due To The Procuring Entity Exceeds Any Payment Due To The Contractor, The Difference Shall Be A Debt Payable To The Procuring Entity. 46.2. If The Contract Is Terminated For The Procuring Entity’s Convenience Or Because Of A Fundamental Breach Of Contract By The Procuring Entity, The Procuring Entity’s Representative Shall Issue A Certificate For The Value Of The Work Done, Materials Ordered, The Reasonable Cost Of Removal Of Equipment, Repatriation Of The Contractor’s Personnel Employed Solely On The Works, And The Contractor’s Costs Of Protecting And Securing The Works, And Less Advance Payments Received Up To The Date Of The Certificate. 46.3. The Net Balance Due Shall Be Paid Or Repaid Within Twenty Eight (28) Days From The Notice Of Termination. 46.4. If The Contractor Has Terminated The Contract Under Gcc Clauses 17 Or 18, The Procuring Entity Shall Promptly Return The Performance Security To The Contractor. 47. Extension Of Contract Time 47.1. Should The Amount Of Additional Work Of Any Kind Or Other Special Circumstances Of Any Kind Whatsoever Occur Such As To Fairly Entitle The Contractor To An Extension Of Contract Time, The Procuring Entity Shall Determine The Amount Of Such Extension; Provided That The Procuring Entity Is Not Bound To Take Into Account Any Claim For An Extension Of Time Unless The Contractor Has, Prior To The Expiration Of The Contract Time And Within Thirty (30) Calendar Days After Such Work Has Been Commenced Or After The Circumstances Leading To Such Claim Have Arisen, Delivered To The Procuring Entity Notices In Order That It Could Have Investigated Them At That Time. Failure To Provide Such Notice Shall Constitute A Waiver By The Contractor Of Any Claim. Upon Receipt Of Full And Detailed Particulars, The Procuring Entity Shall Examine The Facts And Extent Of The Delay And Shall Extend The Contract Time Completing The Contract Work When, In The Procuring Entity’s Opinion, The Findings Of Facts Justify An Extension. 47.2. No Extension Of Contract Time Shall Be Granted The Contractor Due To (a) Ordinary Unfavorable Weather Conditions And (b) Inexcusable Failure Or Negligence Of Contractor To Provide The Required Equipment, Supplies Or Materials. 47.3. Extension Of Contract Time May Be Granted Only When The Affected Activities Fall Within The Critical Path Of The Pert/cpm Network. 47.4. No Extension Of Contract Time Shall Be Granted When The Reason Given To Support The Request For Extension Was Already Considered In The Determination Of The Original Contract Time During The Conduct Of Detailed Engineering And In The Preparation Of The Contract Documents As Agreed Upon By The Parties Before Contract Perfection. 47.5. Extension Of Contract Time Shall Be Granted For Rainy/unworkable Days Considered Unfavorable For The Prosecution Of The Works At The Site, Based On The Actual Conditions Obtained At The Site, In Excess Of The Number Of Rainy/unworkable Days Pre-determined By The Procuring Entity In Relation To The Original Contract Time During The Conduct Of Detailed Engineering And In The Preparation Of The Contract Documents As Agreed Upon By The Parties Before Contract Perfection, And/or For Equivalent Period Of Delay Due To Major Calamities Such As Exceptionally Destructive Typhoons, Floods And Earthquakes, And Epidemics, And For Causes Such As Non-delivery On Time Of Materials, Working Drawings, Or Written Information To Be Furnished By The Procuring Entity, Non-acquisition Of Permit To Enter Private Properties Within The Right-of-way Resulting In Complete Paralyzation Of Construction Activities, And Other Meritorious Causes As Determined By The Procuring Entity’s Representative And Approved By The Head Of The Procuring Entity. Shortage Of Construction Materials, General Labor Strikes, And Peace And Order Problems That Disrupt Construction Operations Through No Fault Of The Contractor May Be Considered As Additional Grounds For Extension Of Contract Time Provided They Are Publicly Felt And Certified By Appropriate Government Agencies Such As Dti, Dole, Dilg, And Dnd, Among Others. The Written Consent Of Bondsmen Must Be Attached To Any Request Of The Contractor For Extension Of Contract Time And Submitted To The Procuring Entity For Consideration And The Validity Of The Performance Security Shall Be Correspondingly Extended. 48. Price Adjustment Except For Extraordinary Circumstances As Determined By Neda And Approved By The Gppb, No Price Adjustment Shall Be Allowed. Nevertheless, In Cases Where The Cost Of The Awarded Contract Is Affected By Any Applicable New Laws, Ordinances, Regulations, Or Other Acts Of The Gop, Promulgated After The Date Of Bid Opening, A Contract Price Adjustment Shall Be Made Or Appropriate Relief Shall Be Applied On A No Loss-no Gain Basis. 49. Completion The Contractor Shall Request The Procuring Entity’s Representative To Issue A Certificate Of Completion Of The Works, And The Procuring Entity’s Representative Will Do So Upon Deciding That The Work Is Completed. 50. Taking Over The Procuring Entity Shall Take Over The Site And The Works Within Seven (7) Days From The Date The Procuring Entity’s Representative Issues A Certificate Of Completion. 51. Operating And Maintenance Manuals 51.1. If “as Built” Drawings And/or Operating And Maintenance Manuals Are Required, The Contractor Shall Supply Them By The Dates Stated In The Scc. 51.2. If The Contractor Does Not Supply The Drawings And/or Manuals By The Dates Stated In The Scc, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative Shall Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Gcc Clause 1.16 The Intended Completion Date Is 45 Cd From Ntp. 1.21 The Procuring Entity Is Lgu- Mapanas, Northern Samar. 1.22 The Procuring Entity’s Representative Is Atty. Ronn Michael L. Tejano Municipal Mayor Municipality Of Mapanas Province Of Northern Samar 1.23 The Site Is Located At Mapanas, Northern Samar. 1.27 The Start Date Is: Upon Receipt Of Notice To Proceed. 1.30 The Works Consist Of: Item No. Scope Of Work Quantity Unit Rehabilitation / Improvement Of Longcop St. Barangay E. Laodenio, Mapanas, Northern Samar Part B Other General Requirements B.5 Projects Billboard/sign Board 1.00 Each B.7(2) Occupational Safety And Health Program 1.00 L.s B.9 Mobilization/demobilization 1.00 L.s Part C Earthworks 101(3)a.2 Removal Existing Pcc Pavement, 0.2m Thk (pcc Reblocking At Intermittent 265.00 Sq.m 102(2)b Surplus Common Excavation 113.00 Cu.m 105(1) Subgrade Preparation (common Materials) 324.00 Sq.m Part D Subbase And Base Course 200(1) Aggregate Subbase Course 59.20 Cu.m 201(1) Aggregate Base Course 64.80 Cu.m Part E Surface Courses 311(1)a.2 Pcc Pavement (plain) Convention Method, 200mm Thk 270.00 Sq.m 2.2 Note: The Items To Follow 5.1 The Procuring Entity Shall Give Possession Of All Parts Of The Site To The Contractor Upon The Issuance Of Notice To Proceed. 6.5 The Contractor Shall Employ The Following Key Personnel: Key Personnel Number Civil Engineer 1 Construction Foreman 1 Labor Workers 3 7.4(c) “no Further Instructions”. 7.7 No Further Instructions. 8.1 No Further Instructions. 10 The Site Investigation Reports Are: None 12.3 No Further Instructions. 12.5 In Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures: Five (5) Years. 13 “no Additional Provision.” 18.3(h)(i) No Further Instructions. 21.2 The Arbiter Is: Construction Industry Arbitration Commission 29.1 No Day Works Are Applicable To The Contract. 31.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within 15days Of Delivery Of The Letter Of Acceptance. 31.3 The Period Between Program Of Work Updates Is 15days. The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is P 1,000.00. 34.3 The Funding Source Is Coming From Nia 39.1 The Amount Of The Advance Payment Is 15% Of The Contract Price (lump Sum) And Shall Be Release Once Upon Presentation Of The Following Documents As Required: 1. Letter Request For Advance Payment From The Contractor 2. Bank Guarantee For Advance Payment 40.1 Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Be Included For Payment. 51.1 The Date By Which Operating And Maintenance Manuals Are Required Is Not Applicable. The Date By Which “as Built” Drawings Are Required Is 20 Days Upon Completion Of The Subproject. 51.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is P1,000.00. Section Vi. Specifications Project Name: Rehabilitation/improvement Of San Roque St. Location : Brgy. Sta. Potenciana, Mapanas, Northern Samar Item No. Description Qty. Unit. B.5 Project Billboard/signboard Labor A.1 A. Construction Foreman 1 4.00 B. Skilled Laborer 1 4.00 C. Unskilled Laborer 2 4.00 Materials A. Tarpaulin (8’x8”) 1.00 Pc A.2 B. Coco Lumber 84.00 Bd.ft C. Plywood Marine (o0.0125m X 1.2m 2.44m) 2.00 Pc D. Assorted Common Wire Nail 0.05 Kg B.7(2) Occupational Safety And Health Program Labor A.1 A. Safety Practitioner/officer (part Time) 1 7.00 B. Health Personnel (full Time) 1 27.00 Equipment A. Safety Shoes 16.00 Man-day B.1 B. Safety Helmet 16.00 Man-day C. Safety/working Gloves 16.00 Man-day D. Safety Vest 16.00 Man-day E. Rubber Boots 16.00 Man-day F. Rain Coats (30% Of The Duration) Optional 5.00 Man-day B.9 Mobilization/demobilization Equipment B.1 A. Dump Truck (12 Cu.yd) 2 16.00 B. Payloader (1.5 Cu.m), Lx80-2c 1 16.00 C. Bulldozer, D6h Series Ii Psd/dd 1 16.00 D. Backhoe W/ Breaker (0.80 Cu.m 1 16.00 101(3)a.2 Removal Of Existing Pcc Pavement, 0.2m Thk, Pccp (reblocking Of Intermittent Section Labor A.1 A. Construction Foreman 1.00 1 B. Unskilled Laborer 1.00 2 Equipment A. Backhoe With Breaker (0.80 Cu.m) 1.00 1 B.1 B. Payloader (1.50), Lx80 – 2c 1.00 1 C. Dump Truck (12 Cu Yd) 0.50 1 D. Concrete Saw (7.5 Hp), 14” Blade Dia 0.50 1 Minor Tools (10% Of Labor Cost) Materials F.1 A. Concrete Saw (diamond Blade 14” Dia) 0.00015 Pc 102(2)b Surplus Common Excavation Labor A.1 A. Construction Foreman 1.00 1 B. Unskilled Laborer 1.00 2 Equipment A. Bulldozer, D6h Series Ii Psd/dd 1.00 1 B.1 B. Payloader (1.5 Cu.m) 1.00 1 C. Payloader (1.5 Cu.m) 0.30 1 D. Dump Truck, (12 Cy. Yd) 1.00 3 E. Backhoe (0.80 Cu.m) 1.00 1 105(1) Subgrade Preparation (common Materials) Labor A.1 A. Construction Foreman 1.00 1 B. Unskilled Laborer 1.00 2 Equipment A. Motorized Road Grader, G710a 1.00 1 B.1 B. Vibratory Roller (10 M.t,) Sd100dc 1.00 1 C. Water Truck/pump (16000 L) 0.25 1 200(1) Aggregate Subbase Course A.1 A. Construction Foreman 1.00 1 B. Unskilled Laborer 1.00 2 Equipment A. Motorized Road Grader, G710a 1.00 1 B.1 B. Vibratory Roller (10 M.t,) Sd100dc 1.00 1 C. Water Truck/pump (16000 L) 0.25 1 Materials B.2 A. Aggregate Subbase Course 1.15 Cu.m (w/ 15% Shrinkage Factor) 201(1) Aggregate Base Course A.1 A. Construction Foreman 1.00 1 B. Unskilled Laborer 1.00 2 Equipment A. Motorized Road Grader, G710a 1.00 1 B.1 B. Vibratory Roller (10 M.t,) Sd100dc 1.00 1 C. Water Truck/pump (16000 L) 0.25 1 Materials B.2 A. Aggregate Subbase Course 1.15 Cu.m (w/ 15% Shrinkage Factor) 311(1)a.2 Pcc Pavement (plain) – Conventional Method, 200mm Thk A.1 A. Construction Foreman 1.00 1 B. Skilled Laborer 1.00 4 C. Skilled Labore 1.00 12 Equipment A. Transit Mixer 1.00 4 B.1 B. Concrete Vibrator 1.00 2 C. Concrete Batch Plant (30 Cu.m) 1.00 1 D. Payloader (1.50 Cu.m)lx80-2c 1.00 1 E. Concrete Screeder (5.5hp) 1.00 1 F. Water Truck/pump 1.00 1 G. Concrete Saw Blade 14’ (7.5hp) 1.00 1 H. Bar Cutter, Single Phase 0.10 1 I. Joint Sealer Machine 0.25 1 Minor Tools (5% Of Labor) Materials A. Reinforcing Steel Bar, Grade 40 0.39 Kg B. Curing Compound 0.29 Lit C. Asphalt Sealant 0.12 Lit D. Steel Form 0.46 L.m E. Sand 0.1100 Cu.m F. Gravel 0.20 Cu.m G. Portland Cement 1.90 Bag H. Concrete Saw (diamond 0.00015 Pc I. Joint Sealer Machine 0.0086 L.m Minor Tools (5% Of Labor) 0.0056 Lit Section Vii. Drawings Bill Of Quantities Item No. Scope Of Work Quantity Unit Unit Cost Total Amount Rehabilitation / Improvement Of San Roque Street. Barangay Sta Potenciana, Mapanas, Northern Samar Part B Other General Requirements B.5 Projects Billboard/sign Board 1.00 Each 10, 959.69 10, 959.69 B.7(2) Occupational Safety And Health Program 1.00 L.s 22, 728.67 22, 728.67 B.9 Mobilization/demobilization 1.00 L.s 7, 659.18 7, 659.18 Part C Earthworks 101(3)a.2 Removal Existing Pcc Pavement, 0.2m Thk (pcc Reblocking At Intermittent 265.00 Sq.m 238.30 63, 149.50 102(2)b Surplus Common Excavation 113.00 Cu.m 204.24 23, 160.82 105(1) Subgrade Preparation (common Materials) 324.00 Sq.m 21.14 6, 849.36 Part D Subbase And Base Course 200(1) Aggregate Subbase Course 59.20 Cu.m 1, 632.38 96, 636.90 201(1) Aggregate Base Course 64.80 Cu.m 2, 843.65 184, 268.52 Part E Surface Courses 311(1)a.2 Pcc Pavement (plain) – Conventional Method 200m, Thk 270 Sq.m 2, 160.51 583, 337.70 Total 998, 750.34 Total Cost Of All Line Item Includes Cost Of Contractor’s Profit, Taxes And Ocm. Attached Detailed Cost Estimates Section Ix. Bidding Forms Table Of Contents Bid Form 79 Form Of Contract Agreement 81 Omnibus Sworn Statement 83 Bid Form Date: Iaeb No: To: Lgu-mapanas Northern Samar Address: Mapanas Northern Samar We, The Undersigned, Declare That: We Have Examined And Have No Reservation To The Bidding Documents, Including Addenda, For The Contract Rehabilitation / Improvement Of San Roque Street, Barangay Sta Potenciana, Mapanas N. Samar (a) We Offer To Execute The Works For This Contract In Accordance With The Bid And Bid Data Sheet, General And Special Conditions Of Contract Accompanying This Bid; The Total Price Of Our Bid, Excluding Any Discounts Offered In Item (d) Below Is: [insert Information]; The Discounts Offered And The Methodology For Their Application Are: [insert Information]; (b) Our Bid Shall Be Valid For A Period Of 120 Days From The Date Fixed For The Bid Submission Deadline In Accordance With The Bidding Documents, And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period; (c) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract; (d) Our Firm, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Have Nationalities From The Following Eligible Countries: [insert Information]; (e) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (f) Our Firm, Its Affiliates Or Subsidiaries, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Has Not Been Declared Ineligible By The Funding Source; (g) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (h) We Understand That You Are Not Bound To Accept The Lowest Evaluated Bid Or Any Other Bid That You May Receive. Name: In The Capacity Of: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Form Of Contract Agreement This Agreement, Made This [insert Date] Day Of [insert Month], [insert Year] Between [name And Address Of Procuring Entity](hereinafter Called The “entity”) And [name And Address Of Contractor] (hereinafter Called The “contractor”). Whereas, The Entity Is Desirous That The Contractor Execute [name And Identification Number Of Contract] (hereinafter Called “the Works”) And The Entity Has Accepted The Bid For [insert The Amount In Specified Currency In Numbers And Words] By The Contractor For The Execution And Completion Of Such Works And The Remedying Of Any Defects Therein. Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents Shall Be Attached, Deemed To Form, And Be Read And Construed As Part Of This Agreement, To Wit: (a) General And Special Conditions Of Contract; (b) Drawings/plans; (c) Specifications; (d) Invitation To Apply For Eligibility And To Bid; (e) Instructions To Bidders; (f) Bid Data Sheet; (g) Addenda And/or Supplemental/bid Bulletins, If Any; (h) Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes; (i) Eligibility Requirements, Documents And/or Statements; (j) Performance Security; (k) Credit Line Issued By A Licensed Bank, If Any; (l) Notice Of Award Of Contract And The Bidder’s Conforme Thereto; (m) Other Contract Documents That May Be Required By Existing Laws And/or The Entity. 3. In Consideration Of The Payments To Be Made By The Entity To The Contractor As Hereinafter Mentioned, The Contractor Hereby Covenants With The Entity To Execute And Complete The Works And Remedy Any Defects Therein In Conformity With The Provisions Of This Contract In All Respects. 4. The Entity Hereby Covenants To Pay The Contractor In Consideration Of The Execution And Completion Of The Works And The Remedying Of Defects Wherein, The Contract Price Or Such Other Sum As May Become Payable Under The Provisions Of This Contract At The Times And In The Manner Prescribed By This Contract. In Witness Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Signed, Sealed, Delivered By The (for The Entity) Signed, Sealed, Delivered By The (for The Contractor). Binding Signature Of Procuring Entity ________________________________________________ Binding Signature Of Contractor _____________________________________________ [addendum Showing The Corrections, If Any, Made During The Bid Evaluation Should Be Attached With This Agreement] Omnibus Sworn Statement Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Represent It In The Bidding For [name Of The Project] Of The [name Of The Procuring Entity]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary And/or To Represent The [name Of Bidder] In The Bidding As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate Issued By The Corporation Or The Members Of The Joint Venture)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder]is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: I Am Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [jurat] * This Form Will Not Apply For Wb Funded Projects.
Closing Date16 Dec 2024
Tender AmountPHP 998.7 K (USD 16.9 K)
Municipality Of Mapanas, Northern Samar Tender
Philippines
Details: Description Bidding Documents Procurement Of Infrastructure Projects Name Of Project: Rehabilatation/improvement Of Longcop St. Barangay E. Loadenio, Mapanas Northern Samar Contract Reference No. 2024-11-104 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 7 Section Iii. Bid Data Sheet 35 Section Iv. General Conditions Of Contract 38 Section V. Special Conditions Of Contract 70 Section Vi. Specifications 72 Section Vii. Drawings 75 Section Viii. Bill Of Quantities Error! Bookmark Not Defined. Section Ix. Bidding Forms 77 Section X. Foreign-assisted Projects Error! Bookmark Not Defined. Section I. Invitation To Bid Bid Notice Abstract Invitation To Bid (itb) Republic Of The Philippines Province Of Northern Samar Municipality Of Mapanas Invitation To Bid For Project: Rehabilatation / Improvement Of Longcop St. Barangay E. Loadenio, Mapanas, Northern Samar The Lgu- Mapanas, Northern Samar, Through The Economic Development Fund Of Fy 2025 Intends To Apply The Sum Of One Million Four Hundred Ninety Two Thousand Six Hundred Sixty Eight Pesos 52/100 Only (p1,492,668.52) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For: Rehabilitation / Improvement Of Longcop St. Barangay E. Laodenio, Mapanas, Northern Samar Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Lgu- Mapanas, Northern Samar Now Invites Bids For The Following Description Of Works To Be Procured: Item No. Scope Of Work Quantity Unit Rehabilitation / Improvement Of Longcop St. Barangay E. Laodenio, Mapanas, Northern Samar Part B Other General Requirements B.5 Projects Billboard/sign Board 1.00 Each B.7(2) Occupational Safety And Health Program 1.00 L.s B.9 Mobilization/demobilization 1.00 L.s Part C Earthworks 101(3)a.2 Removal Existing Pcc Pavement, 0.2m Thk (pcc Reblocking At Intermittent 410.00 Sq.m 102(2)b Surplus Common Excavation 123.00 Cu.m 105(1) Subgrade Preparation (common Materials) 492.00 Sq.m Part D Subbase And Base Course 200(1) Aggregate Subbase Course 89.30 Cu.m 201(1) Aggregate Base Course 98.40 Cu.m Part E Surface Courses 311(1)a.2 Pcc Pavement (plain) Convention Method, 200mm Thk 410.00 Sq.m Completion Of The Works Is Required 60 Calendar Days. Bidders Should Have Completed, Within Ten (10) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. Section Ii. Instructions To Bidders. 2. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From Lgu- Bac Mapanas, Northern Samar And Inspect The Bidding Documents At The Address Given Below From November 26, 2024-december 13, 2024, 8:00 A.m. To 5:00 Pm. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of P5,000.00. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later That The Submission Of Their Bids. 5. The Lgu- Mapana, Northern Samar Will Hold A Pre-bid Conference On December 5, 2024 At 10:00 A.m. At Executive Conference, 2nd Floor Of New Municipal Bldg. Mapanas, Northern Samar, Which Shall Be Open Only To All Interested Parties Who Have Purchased The Bidding Documents. 6. Bids Must Be Delivered To The Address Below On Or Before 9:00 A.m. Of December 16, 2024 At Bac Office, @ Municipal Planning & Development Office (mpdo), Mapanas, Northern Samar. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bids Will Be Opened In The Presence Of The Bidders’ Authorized Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. The Bidder May Request That The Bid Documents Be Sent To Them By Mail Or Courier, And For This, The Bidder Shall Pay The Amount In Philippine Peso To Cover The Cost Of Mail Or Courier Delivery. The Fee For Obtaining A Copy Of The Bid Documents And The Cost Of Mail Or Courier Shall Be Paid By The Bidder Thru S Cashier’s Check Or Manager’s Check Issued In Favor Of The Municipality Of Mapanas. 7. The Lgu- Mapanas, Northern Samar Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 8. For Further Information, Please Refer To: Reno C. Salazar Bac Secretary Mapanas, Northern Samar Mobile # 09459852914 Ma. Teresa L. Minguez Bac Chairperson Mapanas, Northern Samar Mobile # 09778033758 Section Ii. Instructions To Bidders 1. The Bids Must Be Delivered On Or Before December 16, 2024 At 9:00 A.m And Failure To Submit The Bid Proposal May Ground For Disqualification Of The Bid. 2. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Lgu- Mapanas, Northern Samar Now Invites Bids For The Following Description Of Works To Be Procured: Item No. Scope Of Work Quantity Unit Rehabilitation / Improvement Of Longcop St. Barangay E. Laodenio, Mapanas, Northern Samar Part B Other General Requirements B.5 Projects Billboard/sign Board 1.00 Each B.7(2) Occupational Safety And Health Program 1.00 L.s B.9 Mobilization/demobilization 1.00 L.s Part C Earthworks 101(3)a.2 Removal Existing Pcc Pavement, 0.2m Thk (pcc Reblocking At Intermittent 410.00 Sq.m 102(2)b Surplus Common Excavation 123.00 Cu.m 105(1) Subgrade Preparation (common Materials) 492.00 Sq.m Part D Subbase And Base Course 200(1) Aggregate Subbase Course 89.30 Cu.m 201(1) Aggregate Base Course 98.40 Cu.m Part E Surface Courses 311(1)a.2 Pcc Pavement (plain) Convention Method, 200mm Thk 410.00 Sq.m Completion Of The Works Is Required 120 Calendar Days. Bidders Should Have Completed, Within Ten (10) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 2. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 3. Interested Bidders May Obtain Further Information From Lgu- Bac Mapanas, Northern Samar And Inspect The Bidding Documents At The Address Given Below From November 26, 2024-december 13, 2024, 8:00 A.m. To 5:00 Pm. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of P5,000.00. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later That The Submission Of Their Bids. 4. The Lgu- Mapanas, Northern Samar Will Hold A Pre-bid Conference On December 5, 2024 At 10:00 A.m. At Executive Conference, 2nd Floor Of New Municipal Bldg. Mapanas, Northern Samar, Which Shall Be Open Only To All Interested Parties Who Have Purchased The Bidding Documents. 5. Bids Must Be Delivered To The Address Below On Or Before 9:00 A.m. Of December 16, 2024 At Bac Office, @ Municipal Planning & Development Office (mpdo), Mapanas, Northern Samar. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bids Will Be Opened In The Presence Of The Bidders’ Authorized Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. The Bidder May Request That The Bid Documents Be Sent To Them By Mail Or Courier, And For This, The Bidder Shall Pay The Amount In Philippine Peso To Cover The Cost Of Mail Or Courier Delivery. The Fee For Obtaining A Copy Of The Bid Documents And The Cost Of Mail Or Courier Shall Be Paid By The Bidder Thru S Cashier’s Check Or Manager’s Check Issued In Favor Of The Municipality Of Mapanas. 6. The Lgu- Mapanas, Northern Samar Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 7. For Further Information, Please Refer To: Reno C. Salazar Bac Secretary Mapanas, Northern Samar Mobile # 09459852914 Ma. Teresa L. Minguez Bac Chairperson Mapanas N. Samar Mobile # 09778033758 Table Of Contents A. General 11 1. Scope Of Bid 11 2. Source Of Funds 11 3. Corrupt, Fraudulent, Collusive, And Coercive Practices 11 4. Conflict Of Interest 12 5. Eligible Bidders 14 6. Bidder’s Responsibilities 15 7. Origin Of Goods And Services 17 8. Subcontracts 17 B. Contents Of Bidding Documents 17 9. Pre-bid Conference 17 10. Clarification And Amendment Of Bidding Documents 18 C. Preparation Of Bids 18 11. Language Of Bids 18 12. Documents Comprising The Bid: Eligibility And Technical Components 18 13. Documents Comprising The Bid: Financial Component 21 14. Alternative Bids 21 15. Bid Prices 22 16. Bid Currencies 22 17. Bid Validity 23 18. Bid Security 23 19. Format And Signing Of Bids 25 20. Sealing And Marking Of Bids 26 D. Submission And Opening Of Bids 26 21. Deadline For Submission Of Bids 26 22. Late Bids 26 23. Modification And Withdrawal Of Bids 27 24. Opening And Preliminary Examination Of Bids 27 E. Evaluation And Comparison Of Bids 28 25. Process To Be Confidential 28 26. Clarification Of Bids 29 27. Detailed Evaluation And Comparison Of Bids 29 28. Post Qualification 30 29. Reservation Clause 31 F. Award Of Contract 32 30. Contract Award 32 31. Signing Of The Contract 33 32. Performance Security 33 33. Notice To Proceed 34 A. General 1. Scope Of Bid 1.1. The Procuring Entity As Defined In The Bds, Invites Bids For The Construction Of Works, As Described In Section Vi. Specifications. The Name And Identification Number Of The Contract Is Provided In The Bds. 1.2. The Successful Bidder Will Be Expected To Complete The Works By The Intended Completion Date Specified In Scc Clause 1.16. 2. Source Of Funds The Procuring Entity Has A Budget Or Has Applied For Or Received Funds From The Funding Source Named In The Bds, And In The Amount Indicated In The Bds. It Intends To Apply Part Of The Funds Received For The Project, As Defined In The Bds, To Cover Eligible Payments Under The Contract For The Works. 3. Corrupt, Fraudulent, Collusive, And Coercive Practices 3.1. Unless Otherwise Specified In The Bds, The Procuring Entity, As Well As Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. In Pursuance Of This Policy, The Funding Source: (a) Defines, For Purposes Of This Provision, The Terms Set Forth Below As Follows: (i) "corrupt Practice" Means Behavior On The Part Of Officials In The Public Or Private Sectors By Which They Improperly And Unlawfully Enrich Themselves, Others, Or Induce Others To Do So, By Misusing The Position In Which They Are Placed, And Includes The Offering, Giving, Receiving, Or Soliciting Of Anything Of Value To Influence The Action Of Any Such Official In The Procurement Process Or In Contract Execution; Entering, On Behalf Of The Procuring Entity, Into Any Contract Or Transaction Manifestly And Grossly Disadvantageous To The Same, Whether Or Not The Public Officer Profited Or Will Profit Thereby, And Similar Acts As Provided In Republic Act 3019; (ii) "fraudulent Practice" Means A Misrepresentation Of Facts In Order To Influence A Procurement Process Or The Execution Of A Contract To The Detriment Of The Procuring Entity, And Includes Collusive Practices Among Bidders (prior To Or After Bid Submission) Designed To Establish Bid Prices At Artificial, Non-competitive Levels And To Deprive The Procuring Entity Of The Benefits Of Free And Open Competition; (iii) “collusive Practices” Means A Scheme Or Arrangement Between Two Or More Bidders, With Or Without The Knowledge Of The Procuring Entity, Designed To Establish Bid Prices At Artificial, Non-competitive Levels; And (iv) “coercive Practices” Means Harming Or Threatening To Harm, Directly Or Indirectly, Persons, Or Their Property To Influence Their Participation In A Procurement Process, Or Affect The Execution Of A Contract; (v) “obstructive Practice” Is (aa) Deliberately Destroying, Falsifying, Altering Or Concealing Of Evidence Material To An Administrative Proceedings Or Investigation Or Making False Statements To Investigators In Order To Materially Impede An Administrative Proceedings Or Investigation Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Into Allegations Of A Corrupt, Fraudulent, Coercive Or Collusive Practice; And/or Threatening, Harassing Or Intimidating Any Party To Prevent It From Disclosing Its Knowledge Of Matters Relevant To The Administrative Proceedings Or Investigation Or From Pursuing Such Proceedings Or Investigation; Or (bb) Acts Intended To Materially Impede The Exercise Of The Inspection And Audit Rights Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Herein. (b) Will Reject A Proposal For Award If It Determines That The Bidder Recommended For Award Has Engaged In Corrupt Or Fraudulent Practices In Competing For The Contract; And (c) Will Declare A Firm Ineligible, Either Indefinitely Or For A Stated Period Of Time, To Be Awarded Contract Funded By The Funding Source If It At Any Time Determines That The Firm Has Engaged In Corrupt Or Fraudulent Practices In Competing Or, Or In Executing, A Contract Funded By The Funding Source. 3.2. Further, The Procuring Entity Will Seek To Impose The Maximum Civil, Administrative, And/or Criminal Penalties Available Under The Applicable Laws On Individuals And Organizations Deemed To Be Involved In Any Of The Practices Mentioned In Itb Clause 3.1(a). 3.3. Furthermore, The Funding Source And The Procuring Entity Reserve The Right To Inspect And Audit Records And Accounts Of A Contractor In The Bidding For And Performance Of A Contract Themselves Or Through Independent Auditors As Reflected In The Gcc Clause 34. 4. Conflict Of Interest 4.1. All Bidders Found To Have Conflicting Interests Shall Be Disqualified To Participate In The Procurement At Hand, Without Prejudice To The Imposition Of Appropriate Administrative, Civil, And Criminal Sanctions. A Bidder May Be Considered To Have Conflicting Interests With Another Bidder In Any Of The Events Described In Paragraphs (a) Through (c) And A General Conflict Of Interest In Any Of The Circumstances Set Out In Paragraphs (d) Through (g) Below: (a) A Bidder Has Controlling Shareholders In Common With Another Bidder; (b) A Bidder Receives Or Has Received Any Direct Or Indirect Subsidy From Any Other Bidder; (c) A Bidder Has The Same Legal Representative As That Of Another Bidder For Purposes Of This Bid; (d) A Bidder Has A Relationship, Directly Or Through Third Parties, That Puts Them In A Position To Have Access To Information About Or Influence On The Bid Of Another Bidder Or Influence The Decisions Of The Procuring Entity Regarding This Bidding Process. This Will Include A Firm Or An Organization Who Lends, Or Temporarily Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement For Or Implementation Of The Project If The Personnel Would Be Involved In Any Capacity On The Same Project; (e) A Bidder Submits More Than One Bid In This Bidding Process. However, This Does Not Limit The Participation Of Subcontractors In More Than One Bid; (f) A Bidder Who Participated As A Consultant In The Preparation Of The Design Or Technical Specifications Of The Goods And Related Services That Are The Subject Of The Bid; Or (g) A Bidder Who Lends, Or Temporary Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement For Or Implementation Of The Project, If The Personnel Would Be Involved In Any Capacity On The Same Project. 4.2. In Accordance With Section 47 Of The Irr Of Ra 9184, All Bidding Documents Shall Be Accompanied By A Sworn Affidavit Of The Bidder That It Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), Members Of The Technical Working Group (twg), Members Of The Bac Secretariat, The Head Of The Project Management Office (pmo) Or The End-user Unit, And The Project Consultants, By Consanguinity Or Affinity Up To The Third Civil Degree. On The Part Of The Bidder, This Clause Shall Apply To The Following Persons: (a) If The Bidder Is An Individual Or A Sole Proprietorship, To The Bidder Himself; (b) If The Bidder Is A Partnership, To All Its Officers And Members; (c) If The Bidder Is A Corporation, To All Its Officers, Directors, And Controlling Stockholders; And (d) If The Bidder Is A Joint Venture (jv), The Provisions Of Items (a), (b), Or (c) Of This Clause Shall Correspondingly Apply To Each Of The Members Of The Said Jv, As May Be Appropriate. Relationship Of The Nature Described Above Or Failure To Comply With This Clause Will Result In The Automatic Disqualification Of A Bidder. 5. Eligible Bidders 5.1. Unless Otherwise Indicated In The Bds, The Following Persons Shall Be Eligible To Participate In This Bidding: (a) Duly Licensed Filipino Citizens/sole Proprietorships; (b) Partnerships Duly Organized Under The Laws Of The Philippines And Of Which At Least Seventy Five Percent (75%) Of The Interest Belongs To Citizens Of The Philippines; (c) Corporations Duly Organized Under The Laws Of The Philippines, And Of Which At Least Seventy Five Percent (75%) Of The Outstanding Capital Stock Belongs To Citizens Of The Philippines; (d) Cooperatives Duly Organized Under The Laws Of The Philippines, And Of Which At Least Seventy Five Percent (75%) Of The Interest Belongs To Citizens Of The Philippines; And (e) Persons/entities Forming Themselves Into A Jv, I.e., A Group Of Two (2) Or More Persons/entities That Intend To Be Jointly And Severally Responsible Or Liable For A Particular Contract: Provided, However, That, In Accordance With Letter Of Instructions No. 630, Filipino Ownership Or Interest Of The Joint Venture Concerned Shall Be At Least Seventy Five Percent (75%): Provided, Further, That Joint Ventures In Which Filipino Ownership Or Interest Is Less Than Seventy Five Percent (75%) May Be Eligible Where The Structures To Be Built Require The Application Of Techniques And/or Technologies Which Are Not Adequately Possessed By A Person/entity Meeting The Seventy Five Percent (75%) Filipino Ownership Requirement: Provided, Finally, That In The Latter Case, Filipino Ownership Or Interest Shall Not Be Less Than Twenty Five Percent (25%). For This Purpose Filipino Ownership Or Interest Shall Be Based On The Contributions Of Each Of The Members Of The Joint Venture As Specified In Their Jva. 5.2. The Procuring Entity May Also Invite Foreign Bidders When Provided For Under Any Treaty Or International Or Executive Agreement As Specified In The Bds. 5.3. Government Corporate Entities May Be Eligible To Participate Only If They Can Establish That They (a) Are Legally And Financially Autonomous, (b) Operate Under Commercial Law, And (c) Are Not Dependent Agencies Of The Gop Or The Procuring Entity. 5.4. (a) Unless Otherwise Provided In The Bds, The Bidder Must Have Completed, Within Ten (10) Years From The Submission Of Bids, A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted To Current Prices Using The National Statistics Office Consumer Price Index. (b) For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bds. For This Purpose, Contracts Similar To The Project Shall Be Those Described In Thebds, And Completed Within The Period Stated In The Invitation To Bid And Itb Clause 12.1(a)(iii). 5.5. The Bidder Must Submit A Computation Of Its Net Financial Contracting Capacity (nfcc) Or A Commitment From A Universal Or Commercial Bank To Extend A Credit Line In Its Favor If Awarded The Contract For This Project (clc). The Nfcc, Computed Using The Following Formula, Must Be At Least Equal To The Abc To Be Bid: Nfcc = [(current Assets Minus Current Liabilities) (k)] Minus The Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Ongoing Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project. Where: K = 10 For A Contract Duration Of One Year Or Less, 15 For A Contract Duration Of More Than One Year Up To Two Years, And 20 For A Contract Duration Of More Than Two Years. The Clc Must Be At Least Equal To Ten Percent (10%) Of The Abc For This Project. If Issued By A Foreign Bank, It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank. In The Case Of Local Government Units (lgus), The Bidder May Also Submit Clc From Other Banks Certified By The Bangko Sentral Ng Pilipinas (bsp) As Authorized To Issue Such Financial Instrument. 6. Bidder’s Responsibilities 6.1. The Bidder Or Its Duly Authorized Representative Shall Submit A Sworn Statement In The Form Prescribed In Section Ix. Bidding Forms As Required In Itb Clause 12.1(b)(iii). 6.2. The Bidder Is Responsible For The Following: (a) Having Taken Steps To Carefully Examine All Of The Bidding Documents; (b) Having Acknowledged All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; (c) Having Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; (d) Having Complied With Its Responsibility To Inquire Or Secure Supplemental/bid Bulletin/s As Provided Under Itb Clause 10.3. (e) Ensuring That It Is Not “blacklisted” Or Barred From Bidding By The Gop Or Any Of Its Agencies, Offices, Corporations, Or Lgus, Including Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Gppb; (f) Ensuring That Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; (g) Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative/s To Verify All The Documents Submitted; (h) Ensuring That The Signatory Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary And/or To Represent The Bidder In The Bidding, With The Duly Notarized Secretary’s Certificate Attesting To Such Fact, If The Bidder Is A Corporation, Partnership, Cooperative, Or Joint Venture; (i) Complying With The Disclosure Provision Under Section 47 Of The Act In Relation To Other Provisions Of Republic Act 3019; And (j) Complying With Existing Labor Laws And Standards, If Applicable. Failure To Observe Any Of The Above Responsibilities Shall Be At The Risk Of The Bidder Concerned. 6.3. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contract Works And The Conditions For This Project And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 6.4. It Shall Be The Sole Responsibility Of The Prospective Bidder To Determine And To Satisfy Itself By Such Means As It Considers Necessary Or Desirable As To All Matters Pertaining To This Project, Including: (a) The Location And The Nature Of The Contract, Project, Or Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work. 6.5. The Procuring Entity Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Or Conclusions By The Prospective Or Eligible Bidder Out Of The Data Furnished By The Procuring Entity. 6.6. Before Submitting Their Bids, The Bidders Are Deemed To Have Become Familiar With All Existing Laws, Decrees, Ordinances, Acts And Regulations Of The Philippines Which May Affect The Contract In Any Way. 6.7. The Bidder Shall Bear All Costs Associated With The Preparation And Submission Of His Bid, And The Procuring Entity Will In No Case Be Responsible Or Liable For Those Costs, Regardless Of The Conduct Or Outcome Of The Bidding Process. 6.8. Bidders Should Note That The Procuring Entity Will Only Accept Bids Only From Those That Have Paid The Nonrefundable Fee For The Bidding Documents At The Office Indicated In The Invitation To Bid. 7. Origin Of Goods And Services There Is No Restriction On The Origin Of Goods, Or Contracting Of Works Or Services Other Than Those Prohibited By A Decision Of The United Nations Security Council Taken Under Chapter Vii Of The Charter Of The United Nations. 8. Subcontracts 8.1. Unless Otherwise Specified In The Bds, The Bidder May Subcontract Portions Of The Works To An Extent As May Be Approved By The Procuring Entity And Stated In The Bds. However, Subcontracting Of Any Portion Shall Not Relieve The Bidder From Any Liability Or Obligation That May Arise From The Contract For This Project. 8.2. Subcontractors Must Submit The Documentary Requirements Under Itb Clause 12 And Comply With The Eligibility Criteria Specified In The Bds. In The Event That Any Subcontractor Is Found By The Procuring Entity To Be Ineligible, The Subcontracting Of Such Portion Of The Works Shall Be Disallowed. 8.3. The Bidder May Identify The Subcontractor To Whom A Portion Of The Works Will Be Subcontracted At Any Stage Of The Bidding Process Or During Contract Implementation. If The Bidder Opts To Disclose The Name Of The Subcontractor During Bid Submission, The Bidder Shall Include The Required Documents As Part Of The Technical Component Of Its Bid. B. Contents Of Bidding Documents 9. Pre-bid Conference 9.1. (a) If So Specified In The Bds, A Pre-bid Conference Shall Be Held At The Venue And On The Date Indicated Therein, To Clarify And Address The Bidders’ Questions On The Technical And Financial Components Of This Project. (b) The Pre-bid Conference Shall Be Held At Least Twelve (12) Calendar Days Before The Deadline For The Submission Of And Receipt Of Bids. If The Procuring Entity Determines That, By Reason Of The Method, Nature, Or Complexity Of The Contract To Be Bid, Or When International Participation Will Be More Advantageous To The Gop, A Longer Period For The Preparation Of Bids Is Necessary, The Pre-bid Conference Shall Be Held At Least Thirty (30) Calendar Days Before The Deadline For The Submission And Receipt Of Bids, As Specified In The Bds. 9.2. Bidders Are Encouraged To Attend The Pre-bid Conference To Ensure That They Fully Understand The Procuring Entity’s Requirements. Non-attendance Of The Bidder Will In No Way Prejudice Its Bid; However, The Bidder Is Expected To Know The Changes And/or Amendments To The Bidding Documents As Recorded In The Minutes Of The Pre-bid Conference And The Supplemental/bid Bulletin. 9.3. Any Statement Made At The Pre-bid Conference Shall Not Modify The Terms Of The Bidding Documents Unless Such Statement Is Specifically Identified In Writing As An Amendment Thereto And Issued As A Supplemental/bid Bulletin. 10. Clarification And Amendment Of Bidding Documents 10.1. Bidders Who Have Purchased The Bidding Documents May Request For Clarification(s) On Any Part Of The Bidding Documents Or For An Interpretation. Such A Request Must Be In Writing And Submitted To The Procuring Entity At The Address Indicated In The Bds At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10.2. Supplemental/bid Bulletins May Be Issued Upon The Procuring Entity’s Initiative For Purposes Of Clarifying Or Modifying Any Provision Of The Bidding Documents Not Later Than Seven (7) Calendar Days Before The Deadline For The Submission And Receipt Of Bids. Any Modification To The Bidding Documents Shall Be Identified As An Amendment. 10.3. Any Supplemental/bid Bulletin Issued By The Bac Shall Also Be Posted On The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity Concerned, If Available. Unless, Otherwise Provided In The Bds, It Shall Be The Responsibility Of All Bidders Who Secure The Bidding Documents To Inquire And Secure Supplemental/bid Bulletins That May Be Issued By The Bac. However, Bidders Who Have Submitted Bids Before The Issuance Of The Supplemental/bid Bulletin Must Be Informed And Allowed To Modify Or Withdraw Their Bids In Accordance With Itb Clause 23. C. Preparation Of Bids 11. Language Of Bids The Bid, As Well As All Correspondence And Documents Relating To The Bid Exchanged By The Bidder And The Procuring Entity, Shall Be Written In English. Supporting Documents And Printed Literature Furnished By The Bidder May Be In Another Language Provided They Are Accompanied By An Accurate Translation In English Certified By The Appropriate Embassy Or Consulate In The Philippines, In Which Case The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 12. Documents Comprising The Bid: Eligibility And Technical Components 12.1. Unless Otherwise Indicated In The Bds, The First Envelope Shall Contain The Following Eligibility And Technical Documents: (a) Eligibility Documents – Class "a" Documents: (i) Registration Certificate From The Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives, Or Any Proof Of Such Registration As Stated In The Bds; (ii) Mayor’s Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located; (iii) Statement Of All Its Ongoing And Completed Government And Private Contracts Within Ten (10) Years From The Submission Of Bids, Including Contracts Awarded But Not Yet Started, If Any. The Statement Shall Include, For Each Contract, The Following: (iii.1) Name Of The Contract; (iii.2) Date Of The Contract; (iii.3) Contract Duration; (iii.4) Owner’s Name And Address; (iii.5) Nature Of Work; (iii.6) Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation; (iii.7) Total Contract Value At Award; (iii.8) Date Of Completion Or Estimated Completion Time; (iii.9) Total Contract Value At Completion, If Applicable; (iii.10) Percentages Of Planned And Actual Accomplishments, If Applicable; (iii.11) Value Of Outstanding Works, If Applicable; (iii.12) The Statement Shall Be Supported By The Notices Of Award And/or Notices To Proceed Issued By The Owners; And (iii.13) The Statement Shall Be Supported By The Constructors Performance Evaluation System (cpes) Rating Sheets, And/or Certificates Of Completion And Owner’s Acceptance, If Applicable; (iv) Unless Otherwise Provided In The Bds, Valid Philippine Contractors Accreditation Board (pcab) License And Registration For The Type And Cost Of The Contract For This Project; (v) Audited Financial Statements, Showing, Among Others, The Prospective Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; (vi) Nfcc Computation Or Clc In Accordance With Itb Clause 5.5; And Class "b" Document: (vii) If Applicable, Valid Joint Venture Agreement (jva) Or, In Lieu Thereof, Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful Shall Be Included In The Bid. (b) Technical Documents – (i) Bid Security As Prescribed In Itb Clause 18. If The Bidder Opts To Submit The Bid Security In The Form Of: (i.1) A Bank Draft/guarantee Or An Irrevocable Letter Of Credit Issued By A Foreign Bank, It Shall Be Accompanied By A Confirmation From A Universal Or Commercial Bank; Or (i.2) A Surety Bond Accompanied By A Certification Coming From An Authorized Insurance Commission That A Surety Or Insurance Company Is Authorized To Issue Such Instrument; (ii) Project Requirements, Which Shall Include The Following: (ii.1) Organizational Chart For The Contract To Be Bid; (ii.2) List Of Contractor’s Personnel (viz, Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; And (ii.3) List Of Contractor’s Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project; And (iii) Sworn Statement In Accordance With Section 25.2(b)(iv) Of The Irr Of Ra 9184 And Using The Form Prescribed In Section Ix. Bidding Forms. 13. Documents Comprising The Bid: Financial Component 13.1. Unless Otherwise Stated In The Bds, The Financial Component Of The Bid Shall Contain The Following: (a) Financial Bid Form In Accordance With The Form Prescribed In Section Ix. Bidding Forms; And (b) Any Other Document Related To The Financial Component Of The Bid As Stated In The Bds. 13.2. (a) Unless Indicated In The Bds, All Bids That Exceed The Abc Shall Not Be Accepted. (b) Unless Otherwise Indicated In The Bds, For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Following Conditions Are Met: (i) Bidding Documents Are Obtainable Free Of Charge On A Freely Accessible Website. If Payment Of Bidding Documents Is Required By The Procuring Entity, Payment Could Be Made Upon The Submission Of Bids. (ii) The Procuring Entity Has Procedures In Place To Ensure That The Abc Is Based On Recent Estimates Made By The Engineer Or The Responsible Unit Of The Procuring Entity And That The Estimates Are Based On Adequate Detailed Engineering (in The Case Of Works) And Reflect The Quality, Supervision And Risk And Inflationary Factors, As Well As Prevailing Market Prices, Associated With The Types Of Works Or Goods To Be Procured. (iii) The Procuring Entity Has Trained Cost Estimators On Estimating Prices And Analyzing Bid Variances. In The Case Of Infrastructure Projects, The Procuring Entity Must Also Have Trained Quantity Surveyors. (iv) The Procuring Entity Has Established A System To Monitor And Report Bid Prices Relative To Abc And Engineer’s/procuring Entity’s Estimate. (v) The Procuring Entity Has Established A Monitoring And Evaluation System For Contract Implementation To Provide A Feedback On Actual Total Costs Of Goods And Works. 14. Alternative Bids 14.1. Alternative Bids Shall Be Rejected. For This Purpose, Alternative Bid Is An Offer Made By A Bidder In Addition Or As A Substitute To Its Original Bid Which May Be Included As Part Of Its Original Bid Or Submitted Separately Therewith For Purposes Of Bidding. A Bid With Options Is Considered An Alternative Bid Regardless Of Whether Said Bid Proposal Is Contained In A Single Envelope Or Submitted In Two (2) Or More Separate Bid Envelopes. 14.2. Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 14.3. Each Bidder Shall Submit Only One Bid, Either Individually Or As A Partner In A Jv. A Bidder Who Submits Or Participates In More Than One Bid (other Than As A Subcontractor If A Subcontractor Is Permitted To Participate In More Than One Bid) Will Cause All The Proposals With The Bidder’s Participation To Be Disqualified. This Shall Be Without Prejudice To Any Applicable Criminal, Civil And Administrative Penalties That May Be Imposed Upon The Persons And Entities Concerned. 15. Bid Prices 15.1. The Contract Shall Be For The Whole Works, As Described In Itb Clause 1.1, Based On The Priced Bill Of Quantities Submitted By The Bidder. 15.2. The Bidder Shall Fill In Rates And Prices For All Items Of The Works Described In The Bill Of Quantities. Bids Not Addressing Or Providing All Of The Required Items In The Bidding Documents Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A "0" (zero) For The Said Item Would Mean That It Is Being Offered For Free To The Government. 15.3. All Duties, Taxes, And Other Levies Payable By The Contractor Under The Contract, Or For Any Other Cause, Prior To The Deadline For Submission Of Bids, Shall Be Included In The Rates, Prices, And Total Bid Price Submitted By The Bidder. 15.4. All Bid Prices For The Given Scope Of Work In The Contract As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Specified In Gcc Clause 48. Price Escalation May Be Allowed In Extraordinary Circumstances As May Be Determined By The National Economic And Development Authority In Accordance With The Civil Code Of The Philippines, And Upon The Recommendation Of The Procuring Entity. Furthermore, In Cases Where The Cost Of The Awarded Contract Is Affected By Any Applicable New Laws, Ordinances, Regulations, Or Other Acts Of The Gop, Promulgated After The Date Of Bid Opening, A Contract Price Adjustment Shall Be Made Or Appropriate Relief Shall Be Applied On A No Loss-no Gain Basis. 16. Bid Currencies 16.1. All Bid Prices Shall Be Quoted In Philippine Pesos Unless Otherwise Provided In The Bds. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate Prevailing On The Day Of The Bid Opening. 16.2. If So Allowed In Accordance With Itb Clause 16.1, The Procuring Entity For Purposes Of Bid Evaluation And Comparing The Bid Prices Will Convert The Amounts In Various Currencies In Which The Bid Price Is Expressed To Philippine Pesos At The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 16.3. Unless Otherwise Specified In The Bds, Payment Of The Contract Price Shall Be Made In Philippine Pesos. 17. Bid Validity 17.1. Bids Shall Remain Valid For The Period Specified In The Bds Which Shall Not Exceed One Hundred Twenty (120) Calendar Days From The Date Of The Opening Of Bids. 17.2. In Exceptional Circumstances, Prior To The Expiration Of The Bid Validity Period, The Procuring Entity May Request Bidders To Extend The Period Of Validity Of Their Bids. The Request And The Responses Shall Be Made In Writing. The Bid Security Described In Itb Clause 18 Should Also Be Extended Corresponding To The Extension Of The Bid Validity Period At The Least. A Bidder May Refuse The Request Without Forfeiting Its Bid Security, But His Bid Shall No Longer Be Considered For Further Evaluation And Award. A Bidder Granting The Request Shall Not Be Required Or Permitted To Modify Its Bid. 18. Bid Security 18.1. The Bid Security In The Amount Stated In The Bds Shall Be Equal To The Percentage Of The Abc In Accordance With The Following Schedule: Form Of Bid Security Amount Of Bid Security (equal To Percentage Of The Abc) (a) Cash Or Cashier’s/manager’s Check Issued By A Universal Or Commercial Bank. Two Percent (2%) (b) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank. (c) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security; And/or Five Percent (5%) (d) Any Combination Of The Foregoing. Proportionate To Share Of Form With Respect To Total Amount Of Security For Biddings Conducted By Local Government Units, The Bidder May Also Submit Bid Securities In The Form Of Cashier’s/manager’s Check, Bank Draft/guarantee, Or Irrevocable Letter Of Credit From Other Banks Certified By The Bsp As Authorized To Issue Such Financial Statement. 18.2. The Bid Security Should Be Valid For The Period Specified In The Bds. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 18.3. No Bid Securities Shall Be Returned To Bidders After The Opening Of Bids And Before Contract Signing, Except To Those That Failed Or Declared As Post-disqualified, Upon Submission Of A Written Waiver Of Their Right To File A Motion For Reconsideration And/or Protest. Without Prejudice On Its Forfeiture, Bid Securities Shall Be Returned Only After The Bidder With The Lowest Calculated Responsive Bid Has Signed The Contract And Furnished The Performance Security, But In No Case Later Than The Expiration Of The Bid Security Validity Period Indicated In Itb Clause 18.2. 18.4. Upon Signing And Execution Of The Contract, Pursuant To Itb Clause 31, And The Posting Of The Performance Security, Pursuant To Itb Clause 32, The Successful Bidder’s Bid Security Will Be Discharged, But In No Case Later Than The Bid Security Validity Period As Indicated In Itb Clause 18.2. 18.5. The Bid Security May Be Forfeited: (a) If A Bidder: (i) Withdraws Its Bid During The Period Of Bid Validity Specified In Itb Clause 17; (ii) Does Not Accept The Correction Of Errors Pursuant To Itb Clause 27.3(b); (iii) Fails To Submit The Requirements Within The Prescribed Period, Or A Finding Against Their Veracity, As Stated In Itb Clause 28.2; (iv) Submission Of Eligibility Requirements Containing False Information Or Falsified Documents; (v) Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding; (vi) Allowing The Use Of One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding; (vii) Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid; (viii) Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time; (ix) Refusal To Clarify Or Validate In Writing Its Bid During Post-qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification; (x) Any Documented Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor; (xi) Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared Successful; Or (xii) All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons. (b) If The Successful Bidder: (i) Fails To Sign The Contract In Accordance With Itb Clause 31; (ii) Fails To Furnish Performance Security In Accordance With Itb Clause 32. 19. Format And Signing Of Bids 19.1. Bidders Shall Submit Their Bids Through Their Duly Authorized Representative Using The Appropriate Forms Provided In Section Ix. Bidding Forms On Or Before The Deadline Specified In The Itb Clause 21 In Two (2) Separate Sealed Bid Envelopes, And Which Shall Be Submitted Simultaneously. The First Shall Contain The Technical Component Of The Bid, Including The Eligibility Requirements Under Itb Clause 12.1, And The Second Shall Contain The Financial Component Of The Bid. 19.2. Forms As Mentioned In Itb Clause 19.1 Must Be Completed Without Any Alterations To Their Format, And No Substitute Form Shall Be Accepted. All Blank Spaces Shall Be Filled In With The Information Requested. 19.3. The Bidder Shall Prepare An Original Of The First And Second Envelopes As Described In Itb Clauses 12 And 13. In Addition, The Bidder Shall Submit Copies Of The First And Second Envelopes. In The Event Of Any Discrepancy Between The Original And The Copies, The Original Shall Prevail. 19.4. The Bid, Except For Unamended Printed Literature, Shall Be Signed, And Each And Every Page Thereof Shall Be Initialed, By The Duly Authorized Representative/s Of The Bidder. 19.5. Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By The Duly Authorized Representative/s Of The Bidder. 20. Sealing And Marking Of Bids 20.1. Bidders Shall Enclose Their Original Eligibility And Technical Documents Described In Itb Clause 12, In One Sealed Envelope Marked “original - Technical Component”, And The Original Of Their Financial Component In Another Sealed Envelope Marked “original - Financial Component”, Sealing Them All In An Outer Envelope Marked “original Bid”. 20.2. Each Copy Of The First And Second Envelopes Shall Be Similarly Sealed Duly Marking The Inner Envelopes As “copy No. ___ - Technical Component” And “copy No. ___ – Financial Component” And The Outer Envelope As “copy No. ___”, Respectively. These Envelopes Containing The Original And The Copies Shall Then Be Enclosed In One Single Envelope. 20.3. The Original And The Number Of Copies Of The Bid As Indicated In The Bds Shall Be Typed Or Written In Indelible Ink And Shall Be Signed By The Bidder Or Its Duly Authorized Representative/s. 20.4. All Envelopes Shall: (a) Contain The Name Of The Contract To Be Bid In Capital Letters; (b) Bear The Name And Address Of The Bidder In Capital Letters; (c) Be Addressed To The Procuring Entity’s Bac Identified In Itb Clause 10.1; (d) Bear The Specific Identification Of This Bidding Process Indicated In The Invitation To Bid; And (e) Bear A Warning “do Not Open Before…” The Date And Time For The Opening Of Bids, In Accordance With Itb Clause 21. 20.5. If Bids Are Not Sealed And Marked As Required, The Procuring Entity Will Assume No Responsibility For The Misplacement Or Premature Opening Of The Bid. D. Submission And Opening Of Bids 21. Deadline For Submission Of Bids Bids Must Be Received By The Procuring Entity’s Bac At The Address And On Or Before The Date And Time Indicated In The Bds. 22. Late Bids Any Bid Submitted After The Deadline For Submission And Receipt Of Bids Prescribed By The Procuring Entity, Pursuant To Itb Clause 21, Shall Be Declared “late” And Shall Not Be Accepted By The Procuring Entity. 23. Modification And Withdrawal Of Bids 23.1. The Bidder May Modify Its Bid After It Has Been Submitted; Provided That The Modification Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. The Bidder Shall Not Be Allowed To Retrieve Its Original Bid, But Shall Be Allowed To Submit Another Bid Equally Sealed, Properly Identified, Linked To Its Original Bid Marked As “technical Modification” Or “financial Modification” And Stamped “received” By The Bac. Bid Modifications Received After The Applicable Deadline Shall Not Be Considered And Shall Be Returned To The Bidder Unopened. 23.2. A Bidder May, Through A Letter Of Withdrawal, Withdraw Its Bid After It Has Been Submitted, For Valid And Justifiable Reason; Provided That The Letter Of Withdrawal Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. 23.3. Bids Requested To Be Withdrawn In Accordance With Itb Clause 23.1 Shall Be Returned Unopened To The Bidders. A Bidder May Also Express Its Intention Not To Participate In The Bidding Through A Letter Which Should Reach And Be Stamped By The Bac Before The Deadline For Submission And Receipt Of Bids. A Bidder That Withdraws Its Bid Shall Not Be Permitted To Submit Another Bid, Directly Or Indirectly, For The Same Contract. 23.4. No Bid May Be Modified After The Deadline For Submission Of Bids. No Bid May Be Withdrawn In The Interval Between The Deadline For Submission Of Bids And The Expiration Of The Period Of Bid Validity Specified By The Bidder On The Financial Bid Form. Withdrawal Of A Bid During This Interval Shall Result In The Forfeiture Of The Bidder’s Bid Security, Pursuant To Itb Clause 18.5, And The Imposition Of Administrative, Civil, And Criminal Sanctions As Prescribed By Ra 9184 And Its Irr. 24. Opening And Preliminary Examination Of Bids 24.1. The Bac Shall Open The First Bid Envelopes Of Bidders In Public As Specified In The Bds To Determine Each Bidder’s Compliance With The Documents Prescribed In Itb Clause 12. For This Purpose, The Bac Shall Check The Submitted Documents Of Each Bidder Against A Checklist Of Required Documents To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion. If A Bidder Submits The Required Document, It Shall Be Rated “passed” For That Particular Requirement. In This Regard, Bids That Fail To Include Any Requirement Or Are Incomplete Or Patently Insufficient Shall Be Considered As “failed”. Otherwise, The Bac Shall Rate The Said First Bid Envelope As “passed”. 24.2. Unless Otherwise Specified In The Bds, Immediately After Determining Compliance With The Requirements In The First Envelope, The Bac Shall Forthwith Open The Second Bid Envelope Of Each Remaining Eligible Bidder Whose First Bid Envelope Was Rated “passed”. The Second Envelope Of Each Complying Bidder Shall Be Opened Within The Same Day. In Case One Or More Of The Requirements In The Second Envelope Of A Particular Bid Is Missing, Incomplete Or Patently Insufficient, And/or If The Submitted Total Bid Price Exceeds The Abc Unless Otherwise Provided In Itb Clause 13.1(b), The Bac Shall Rate The Bid Concerned As “failed”. Only Bids That Are Determined To Contain All The Bid Requirements For Both Components Shall Be Rated “passed” And Shall Immediately Be Considered For Evaluation And Comparison. 24.3. Letters Of Withdrawal Shall Be Read Out And Recorded During Bid Opening, And The Envelope Containing The Corresponding Withdrawn Bid Shall Be Returned To The Bidder Unopened. If The Withdrawing Bidder’s Representative Is In Attendance, The Original Bid And All Copies Thereof Shall Be Returned To The Representative During The Bid Opening. If The Representative Is Not In Attendance, The Bid Shall Be Returned Unopened By Registered Mail. The Bidder May Withdraw Its Bid Prior To The Deadline For The Submission And Receipt Of Bids, Provided That The Corresponding Letter Of Withdrawal Contains A Valid Authorization Requesting For Such Withdrawal, Subject To Appropriate Administrative Sanctions. 24.4. If A Bidder Has Previously Secured A Certification From The Procuring Entity To The Effect That It Has Previously Submitted The Above-enumerated Class “a” Documents, The Said Certification May Be Submitted In Lieu Of The Requirements Enumerated In Itb Clause 12.1(a), Items (i) To (vi). 24.5. In The Case Of An Eligible Foreign Bidder As Described In Itb Clause 5, The Class “a” Documents Enumerated In Itb Clause 12.1(a) May Be Substituted With The Appropriate Equivalent Documents, If Any, Issued By The Country Of The Foreign Bidder Concerned. 24.6. Each Partner Of A Joint Venture Agreement Shall Likewise Submit The Documents Required In Itb Clauses 12.1(a)(i) And 12.1(a)(ii). Submission Of Documents Required Under Itb Clauses 12.1(a)(iii) To 12.1(a)(vi) By Any Of The Joint Venture Partners Constitutes Compliance. 24.7. A Bidder Determined As “failed” Has Three (3) Calendar Days Upon Written Notice Or, If Present At The Time Of Bid Opening, Upon Verbal Notification Within Which To File A Request For Reconsideration With The Bac: Provided, However, That The Request For Reconsideration Shall Not Be Granted If It Is Established That The Finding Of Failure Is Due To The Fault Of The Bidder Concerned: Provided, Further, That The Bac Shall Decide On The Request For Reconsideration Within Seven (7) Calendar Days From Receipt Thereof. If A Failed Bidder Signifies His Intent To File A Request For Reconsideration, The Bac Shall Keep The Bid Envelopes Of The Said Failed Bidder Unopened And/or Duly Sealed Until Such Time That The Request For Reconsideration Or Protest Has Been Resolved. E. Evaluation And Comparison Of Bids 25. Process To Be Confidential 25.1. Members Of The Bac, Including Its Staff And Personnel, As Well As Its Secretariat And Twg, Are Prohibited From Making Or Accepting Any Kind Of Communication With Any Bidder Regarding The Evaluation Of Their Bids Until The Issuance Of The Notice Of Award, Unless N The Case Of Itb Clause 26. 25.2. Any Effort By A Bidder To Influence The Procuring Entity In The Procuring Entity’s Decision In Respect Of Bid Evaluation, Bid Comparison Or Contract Award Will Result In The Rejection Of The Bidder’s Bid. 26. Clarification Of Bids To Assist In The Evaluation, Comparison And Post-qualification Of The Bids, The Procuring Entity May Ask In Writing Any Bidder For A Clarification Of Its Bid. All Responses To Requests For Clarification Shall Be In Writing. Any Clarification Submitted By A Bidder In Respect To Its Bid And That Is Not In Response To A Request By The Procuring Entity Shall Not Be Considered 27. Detailed Evaluation And Comparison Of Bids 27.1. The Procuring Entity Will Undertake The Detailed Evaluation And Comparison Of Bids Which Have Passed The Opening And Preliminary Examination Of Bids, Pursuant To Itb Clause 24, In Order To Determine The Lowest Calculated Bid. 27.2. In Evaluating The Bids To Get The Lowest Calculated Bid, The Procuring Entity Shall Undertake The Following: (a) The Detailed Evaluation Of The Financial Component Of The Bids, To Establish The Correct Calculated Prices Of The Bids; And (b) The Ranking Of The Total Bid Prices As So Calculated From The Lowest To Highest. The Bid With The Lowest Price Shall Be Identified As The Lowest Calculated Bid. 27.3. The Procuring Entity's Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary “pass/fail” Criterion. The Bac Shall Consider The Following In The Evaluation Of Bids: (a) Completeness Of The Bid. Unless The Itb Specifically Allows Partial Bids, Bids Not Addressing Or Providing All Of The Required Items In The Schedule Of Requirements Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A "0" (zero) For The Said Item Would Mean That It Is Being Offered For Free To The Procuring Entity; And (b) Arithmetical Corrections. Consider Computational Errors And Omissions To Enable Proper Comparison Of All Eligible Bids. It May Also Consider Bid Modifications If Expressly Allowed In The Bds. Any Adjustment Shall Be Calculated In Monetary Terms To Determine The Calculated Prices. 27.4. Based On The Detailed Evaluation Of Bids, Those That Comply With The Above-mentioned Requirements Shall Be Ranked In The Ascending Order Of Their Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, To Identify The Lowest Calculated Bid. Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, Which Exceed The Abc Shall Not Be Considered, Unless Otherwise Indicated In The Bds. 27.5. The Procuring Entity’s Evaluation Of Bids Shall Only Be Based On The Bid Price Quoted In The Financial Bid Form 27.6. Bids Shall Be Evaluated On An Equal Footing To Ensure Fair Competition. For This Purpose, All Bidders Shall Be Required To Include In Their Bids The Cost Of All Taxes, Such As, But Not Limited To, Value Added Tax (vat), Income Tax, Local Taxes, And Other Fiscal Levies And Duties Which Shall Be Itemized In The Bid Form And Reflected In The Detailed Estimates. Such Bids, Including Said Taxes, Shall Be The Basis For Bid Evaluation And Comparison. 28. Post Qualification 28.1. The Procuring Entity Shall Determine To Its Satisfaction Whether The Bidder That Is Evaluated As Having Submitted The Lowest Calculated Bid (lcb) Complies With And Is Responsive To All The Requirements And Conditions Specified In Itb Clauses 5, 12, And 13. 28.2. Within A Non-extendible Period Of Three (3) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lcb, The Bidder Shall Submit The Following Documentary Requirements: (a) Tax Clearance Per Executive Order 398, Series Of 2005; (b) Latest Income And Business Tax Returns In The Form Specified In The Bds; (c) Certificate Of Philgeps Registration; And (d) Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. Failure Of The Bidder Declared As Lcb To Duly Submit The Requirements Under This Clause Or A Finding Against The Veracity Of Such, Shall Be Ground For Forfeiture Of The Bid Security And Disqualification Of The Bidder For Award. 28.3. The Determination Shall Be Based Upon An Examination Of The Documentary Evidence Of The Bidder’s Qualifications Submitted Pursuant To Itb Clauses 12 And 13, As Well As Other Information As The Procuring Entity Deems Necessary And Appropriate, Using A Non-discretionary “pass/fail” Criterion. 28.4. If The Bac Determines That The Bidder With The Lowest Calculated Bid Passes All The Criteria For Post-qualification, It Shall Declare The Said Bid As The Lowest Calculated Responsive Bid, And Recommend To The Head Of The Procuring Entity The Award Of Contract To The Said Bidder At Its Submitted Price Or Its Calculated Bid Price, Whichever Is Lower, Subject To Itb Clause 30.3. 28.5. A Negative Determination Shall Result In Rejection Of The Bidder’s Bid, In Which Event The Procuring Entity Shall Proceed To The Next Lowest Calculated Bid To Make A Similar Determination Of That Bidder’s Capabilities To Perform Satisfactorily. If The Second Bidder, However, Fails The Post Qualification, The Procedure For Post Qualification Shall Be Repeated For The Bidder With The Next Lowest Calculated Bid, And So On Until The Lowest Calculated And Responsive Bid Is Determined For Contract Award. 28.6. Within A Period Not Exceeding Seven (7) Calendar Days From The Date Of Receipt Of The Recommendation Of The Bac, The Head Of The Procuring Entity Shall Approve Or Disapprove The Said Recommendation. In The Case Of Government Owned And Government-owned And/or -controlled Corporations (goccs) And Government Financial Institutions (gfis), The Period Provided Herein Shall Be Fifteen (15) Calendar Days. 29. Reservation Clause 29.1. Notwithstanding The Eligibility Or Post-qualification Of A Bidder, The Procuring Entity Concerned Reserves The Right To Review Its Qualifications At Any Stage Of The Procurement Process If It Has Reasonable Grounds To Believe That A Misrepresentation Has Been Made By The Said Bidder, Or That There Has Been A Change In The Bidder’s Capability To Undertake The Project From The Time It Submitted Its Eligibility Requirements. Should Such Review Uncover Any Misrepresentation Made In The Eligibility And Bidding Requirements, Statements Or Documents, Or Any Changes In The Situation Of The Bidder Which Will Affect Its Capability To Undertake The Project So That It Fails The Preset Eligibility Or Bid Evaluation Criteria, The Procuring Entity Shall Consider The Said Bidder As Ineligible And Shall Disqualify It From Submitting A Bid Or From Obtaining An Award Or Contract. 29.2. Based On The Following Grounds, The Procuring Entity Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding At Any Time Prior To The Contract Award, Or Not To Award The Contract, Without Thereby Incurring Any Liability, And Make No Assurance That A Contract Shall Be Entered Into As A Result Of The Bidding: (a) If There Is Prima Facie Evidence Of Collusion Between Appropriate Public Officers Or Employees Of The Procuring Entity, Or Between The Bac And Any Of The Bidders, Or If The Collusion Is Between Or Among The Bidders Themselves, Or Between A Bidder And A Third Party, Including Any Act Which Restricts, Suppresses Or Nullifies Or Tends To Restrict, Suppress Or Nullify Competition; (b) If The Procuring Entity’s Bac Is Found To Have Failed In Following The Prescribed Bidding Procedures; Or (c) For Any Justifiable And Reasonable Ground Where The Award Of The Contract Will Not Redound To The Benefit Of The Government As Follows: (i) If The Physical And Economic Conditions Have Significantly Changed So As To Render The Project No Longer Economically, Financially Or Technically Feasible As Determined By The Head Of The Procuring Entity; (ii) If The Project Is No Longer Necessary As Determined By The Head Of The Procuring Entity; And (iii) If The Source Of Funds For The Project Has Been Withheld Or Reduced Through No Fault Of The Procuring Entity. 29.3. In Addition, The Procuring Entity May Likewise Declare A Failure Of Bidding When: (a) No Bids Are Received; (b) All Prospective Bidders Are Declared Ineligible; (c) All Bids Fail To Comply With All The Bid Requirements Or Fail Post-qualification; Or (d) The Bidder With The Lowest Calculated Responsive Bid Refuses, Without Justifiable Cause To Accept The Award Of Contract, And No Award Is Made. F. Award Of Contract 30. Contract Award 30.1. Subject To Itb Clause 28, The Procuring Entity Shall Award The Contract To The Bidder Whose Bid Has Been Determined To Be The Lowest Calculated And Responsive Bid (lcrb). 30.2. Prior To The Expiration Of The Period Of Bid Validity, The Procuring Entity Shall Notify The Successful Bidder In Writing That Its Bid Has Been Accepted, Through A Notice Of Award Received Personally Or Sent By Registered Mail Or Electronically, Receipt Of Which Must Be Confirmed In Writing Within Two (2) Days By The Lcrb And Submitted Personally Or Sent By Registered Mail Or Electronically To The Procuring Entity. 30.3. Notwithstanding The Issuance Of The Notice Of Award, Award Of Contract Shall Be Subject To The Following Conditions: (a) Submission Of The Following Documents Within The Prescribed Period From Receipt By The Bidder Of The Notice That It Has The Lowest Calculated And Responsive Bid: (i) Valid Jva, If Applicable, Within Ten (10) Calendar Days; (ii) Valid Pcab License And Registration For The Type And Cost Of The Contract To Be Bid For Foreign Bidders, Within Thirty (30) Calendar Days, If Allowed Under A Treaty Or International Or Executive Agreement Mentioned In Itb Clause 12.1(a)(iv); (b) Posting Of The Performance Security In Accordance With Itb Clause 32; (c) Signing Of The Contract As Provided In Itb Clause 31; And (d) Approval By Higher Authority, If Required. 31. Signing Of The Contract 31.1. At The Same Time As The Procuring Entity Notifies The Successful Bidder That Its Bid Has Been Accepted, The Procuring Entity Shall Send The Contract Form To The Bidder, Which Contract Has Been Provided In The Bidding Documents, Incorporating Therein All Agreements Between The Parties. 31.2. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award, The Successful Bidder Shall Post The Required Performance Security, Sign And Date The Contract And Return It To The Procuring Entity. 31.3. The Procuring Entity Shall Enter Into Contract With The Successful Bidder Within The Same Ten (10) Calendar Day Period Provided That All The Documentary Requirements Are Complied With. 31.4. The Following Documents Shall Form Part Of The Contract: (a) Contract Agreement; (b) Bidding Documents; (c) Winning Bidder’s Bid, Including The Technical And Financial Proposals, And All Other Documents/statements Submitted; (d) Performance Security; (e) Credit Line In Accordance With Itb Clause 5.5, If Applicable; (f) Notice Of Award Of Contract; And (g) Other Contract Documents That May Be Required By Existing Laws And/or Specified In The Bds. 32. Performance Security 32.1. To Guarantee The Faithful Performance By The Winning Bidder Of Its Obligations Under The Contract, It Shall Post A Performance Security Within A Maximum Period Of Ten (10) Calendar Days From The Receipt Of The Notice Of Award From The Procuring Entity And In No Case Later Than The Signing Of The Contract. 32.2. The Performance Security Shall Be Denominated In Philippine Pesos And Posted In Favor Of The Procuring Entity In An Amount Equal To The Percentage Of The Total Contract Price As Stated In The Bds In Accordance With The Following Schedule: 33. 33.1. Form Of Performance Security Amount Of Performance Security (equal To Percentage Of The Total Contract Price) (a) Cash Or Cashier’s/manager’s Check Issued By A Universal Or Commercial Bank. Ten Percent (10%) (b) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank. (c) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security; And/or Thirty Percent (30%) (d) Any Combination Of The Foregoing. Proportionate To Share Of Form With Respect To Total Amount Of Security 33.2. Failure Of The Successful Bidder To Comply With The Above-mentioned Requirement Shall Constitute Sufficient Ground For The Annulment Of The Award And Forfeiture Of The Bid Security, In Which Event The Procuring Entity Shall Initiate And Complete The Post Qualification Of The Second Lowest Calculated Bid. The Procedure Shall Be Repeated Until The Lowest Calculated And Responsive Bid Is Identified And Selected For Contract Award. However If No Bidder Passed Post-qualification, The Bac Shall Declare The Bidding A Failure And Conduct A Re-bidding With Re-advertisement. 34. Notice To Proceed 34.1. Within Three (3) Calendar Days From The Date Of Approval Of The Contract By The Appropriate Government Approving Authority, The Procuring Entity Shall Issue Its Notice To Proceed To The Bidder. 34.2. The Contract Effectivity Date Shall Be Provided In The Notice To Proceed By The Procuring Entity, Which Date Shall Not Be Later Than Seven (7) Calendar Days From The Issuance Of The Notice To Proceed. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 1.1 The Procuring Entity Is Lgu- Mapanas, Northern Samar. The Name Of The Contract Is Rehabilitation / Improvement Of Longcop St. Barangay E. Laodenio, Mapanas N. Samar The Identification Number Of The Contract Is Pr No-2024-11-104__ 2 The Funding Source Is: 20% Economic Development Fund (edf) For Fy 2025. The Name Of The Project Is: Rehabilitation / Improvement Of Longcop St. Barangay E. Laodenio, Mapanas N. Samar 3.1 No Further Instructions. 5.1 No Further Instructions. 5.2 Bidding Is Restricted To Eligible Bidders As Defined In Itb Clause 5.1. 5.4 For This Purpose, Similar Contracts Shall Refer To Bidder’s Annual Turnover From All Works Average Over The Last Three Years Shall Be Equal To 50% Of The Estimated Cost Of The Contract Being Procured. The Bidder Must Have Completed, Within The Past Ten (10) Years From The Submission Of Bids, A Single Contract That Is Similar To This Project, Equivalent To At Least Eighty Percent (80%) Of The Abc. 8.1 “subcontracting Is Not Allowed.” 8.2 “not Applicable”. 9.1 The Procuring Entity Will Hold A Pre-bid Conference For This Project On December 05, 2024 At 10:00 A.m. At Executive Conference 2nd Floor Of New Municipal Bldg. Mapanas, Northern Samar. 10.1 The Procuring Entity’s Address Is: The Municipality Of Mapanas, Province Of Northern Samar Ma. Teresa L. Minguez Lgu-bac Chairperson Tel. No. 09778033758 10.3 No Further Instructions. 12.1 Not Applicable 12.1(a)(i) “no Other Acceptable Proof Of Registration Is Recognized.” 12.1(a)(iv) No Further Instructions. 13.1 “no Additional Requirements” 13.1(b) The Abc Is Php 1,492,688.53 Any Bid With A Financial Component Exceeding This Amount Shall Not Be Accepted. 14.2 “no Further Instructions.” 15.4 No Further Instruction. 16.1 The Bid Prices Shall Be Quoted In Philippine Pesos. 17.1 Bids Will Be Valid Until 120 Calendar Days After The Bid Submission Deadline Date As Prescribed By The Procuring Entity) 18.1 The Bid Security Shall Be In The Following Amount: 1. The Amount Of 29, 853. 77 If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; 2. The Amount Of 74,634.43 If Bid Security Is In Su Rety Bond; Or 3. Any Combination Of The Foregoing Proportionate To The Share Of Form With Respect To Total Amount Of Security. 18.2 The Bid Security Shall Be Valid Twenty Eight Days Beyond The Validity Period Of The Bid. 20.3 Each Bidder Shall Submit One Original And One Copy Of The First And Second Components Of Its Bid. 21 The Address For Submission Of Bids Is Ma. Teresa L. Minguez Lgu-bac Chairperson Bac Office @ Mpdo, 1st Floor, New Municipal Bldg. Municipality Of Mapanas, Northern Samar The Deadline For Submission Of Bids Is 9:00 A.m. On December 16 , 2024. 22 The Place Of Bid Opening Is Executive Conference Room, 2nd Floor, New Municipal Bldg. Municipality Of Mapanas, Northern Samar. The Date And Time Of Bid Opening Is December 16, 2024 At Exactly 10:00 A.m. 24.2 No Further Instructions. 27.3(b) Bid Modification Is Not Allowed. 27.4 No Further Instructions. 28.2(b) Bidders Have Option To Submit Manually Filed Tax Returns Or Tax Returns Filed Through The Electronic Filing And Payments System (efps). Note: The Latest Income And Business Tax Returns Are Those Within The Last Six Months Preceding The Date Of Bid Submission. 28.2(d) List Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It. 1. Taxpayer’s Identification Number 2. Vat Registration 3. Philippine Contractors Accreditation Board (pcab) License The Requirements Are Applicable Only In A Case Where The Lowest Calculated Bid (lcb) Is Submitted By A Domestic Bidder, And If The Lowest Calculated Bid (lcb) Is Submitted By A Foreign Bidder, This Requirements Are Not Applicable 31.4(g) List Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Department Of Labor And Employment, And Pert/cpm. 32.2 The Performance Security Shall Be In The Following Amount: 1. The Amount Of 10% Of Contract If Performance Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; 2. The Amount Of 30% Of Contract If Performance Security Is In Surety Bond; Or 3. Any Combination Of The Foregoing Proportionate To The Share Of Form With Respect To Total Amount Of Security. Section Iv. General Conditions Of Contract Table Of Contents 1. Definitions 41 2. Interpretation 43 3. Governing Language And Law 43 4. Communications 43 5. Possession Of Site 43 6. The Contractor’s Obligations 44 7. Performance Security 45 8. Subcontracting 46 9. Liquidated Damages 46 10. Site Investigation Reports 47 11. The Procuring Entity, Licenses And Permits 47 12. Contractor’s Risk And Warranty Security 47 13. Liability Of The Contractor 49 14. Procuring Entity’s Risk 49 15. Insurance 49 16. Termination For Default Of Contractor 51 17. Termination For Default Of Procuring Entity 51 18. Termination For Other Causes 52 19. Procedures For Termination Of Contracts 53 20. Force Majeure, Release From Performance 56 21. Resolution Of Disputes 56 22. Suspension Of Loan, Credit, Grant, Or Appropriation 57 23. Procuring Entity’s Representative’s Decisions 57 24. Approval Of Drawings And Temporary Works By The Procuring Entity’s Representative 57 25. Acceleration And Delays Ordered By The Procuring Entity’s Representative 58 26. Extension Of The Intended Completion Date 58 27. Right To Vary 58 28. Contractors Right To Claim 59 29. Dayworks 59 30. Early Warning 59 31. Program Of Work 59 32. Management Conferences 60 33. Bill Of Quantities 60 34. Instructions, Inspections And Audits 61 35. Identifying Defects 61 36. Cost Of Repairs 61 37. Correction Of Defects 61 38. Uncorrected Defects 62 39. Advance Payment 62 40. Progress Payments 62 41. Payment Certificates 63 42. Retention 63 43. Variation Orders 64 44. Contract Completion 66 45. Suspension Of Work 66 46. Payment On Termination 67 47. Extension Of Contract Time 67 48. Price Adjustment 68 49. Completion 68 50. Taking Over 69 51. Operating And Maintenance Manuals 69 1. Definitions For Purposes Of This Clause, Boldface Type Is Used To Identify Defined Terms. 1.1. The Arbiter Is The Person Appointed Jointly By The Procuring Entity And The Contractor To Resolve Disputes In The First Instance, As Provided For In Gcc Clause 21. 1.2. Bill Of Quantities Refers To A List Of The Specific Items Of The Work And Their Corresponding Unit Prices, Lump Sums, And/or Provisional Sums. 1.3. The Completion Date Is The Date Of Completion Of The Works As Certified By The Procuring Entity’s Representative, In Accordance With Gcc Clause 49. 1.4. The Contract Is The Contract Between The Procuring Entity And The Contractor To Execute, Complete, And Maintain The Works. 1.5. The Contract Price Is The Price Stated In The Letter Of Acceptance And Thereafter To Be Paid By The Procuring Entity To The Contractor For The Execution Of The Works In Accordance With This Contract. 1.6. Contract Time Extension Is The Allowable Period For The Contractor To Complete The Works In Addition To The Original Completion Date Stated In This Contract. 1.7. The Contractor Is The Juridical Entity Whose Proposal Has Been Accepted By The Procuring Entity And To Whom The Contract To Execute The Work Was Awarded. 1.8. The Contractor’s Bid Is The Signed Offer Or Proposal Submitted By The Contractor To The Procuring Entity In Response To The Bidding Documents. 1.9. Days Are Calendar Days; Months Are Calendar Months. 1.10. Dayworks Are Varied Work Inputs Subject To Payment On A Time Basis For The Contractor’s Employees And Equipment, In Addition To Payments For Associated Materials And Plant. 1.11. A Defect Is Any Part Of The Works Not Completed In Accordance With The Contract. 1.12. The Defects Liability Certificate Is The Certificate Issued By Procuring Entity’s Representative Upon Correction Of Defects By The Contractor. 1.13. The Defects Liability Period Is The One Year Period Between Contract Completion And Final Acceptance Within Which The Contractor Assumes The Responsibility To Undertake The Repair Of Any Damage To The Works At His Own Expense. 1.14. Drawings Are Graphical Presentations Of The Works. They Include All Supplementary Details, Shop Drawings, Calculations, And Other Information Provided Or Approved For The Execution Of This Contract. 1.15. Equipment Refers To All Facilities, Supplies, Appliances, Materials Or Things Required For The Execution And Completion Of The Work Provided By The Contractor And Which Shall Not Form Or Are Not Intended To Form Part Of The Permanent Works. 1.16. The Intended Completion Date Refers To The Date Specified In The Scc When The Contractor Is Expected To Have Completed The Works. The Intended Completion Date May Be Revised Only By The Procuring Entity’s Representative By Issuing An Extension Of Time Or An Acceleration Order. 1.17. Materials Are All Supplies, Including Consumables, Used By The Contractor For Incorporation In The Works. 1.18. The Notice To Proceed Is A Written Notice Issued By The Procuring Entity Or The Procuring Entity’s Representative To The Contractor Requiring The Latter To Begin The Commencement Of The Work Not Later Than A Specified Or Determinable Date. 1.19. Permanent Works All Permanent Structures And All Other Project Features And Facilities Required To Be Constructed And Completed In Accordance With This Contract Which Shall Be Delivered To The Procuring Entity And Which Shall Remain At The Site After The Removal Of All Temporary Works. 1.20. Plant Refers To The Machinery, Apparatus, And The Like Intended To Form An Integral Part Of The Permanent Works. 1.21. The Procuring Entity Is The Party Who Employs The Contractor To Carry Out The Works Stated In The Scc. 1.22. The Procuring Entity’s Representative Refers To The Head Of The Procuring Entity Or His Duly Authorized Representative, Identified In The Scc, Who Shall Be Responsible For Supervising The Execution Of The Works And Administering This Contract. 1.23. The Site Is The Place Provided By The Procuring Entity Where The Works Shall Be Executed And Any Other Place Or Places Which May Be Designated In The Scc, Or Notified To The Contractor By The Procuring Entity’s Representative As Forming Part Of The Site. 1.24. Site Investigation Reports Are Those That Were Included In The Bidding Documents And Are Factual And Interpretative Reports About The Surface And Subsurface Conditions At The Site. 1.25. Slippage Is A Delay In Work Execution Occurring When Actual Accomplishment Falls Below The Target As Measured By The Difference Between The Scheduled And Actual Accomplishment Of The Work By The Contractor As Established From The Work Schedule. This Is Actually Described As A Percentage Of The Whole Works. 1.26. Specifications Means The Description Of Works To Be Done And The Qualities Of Materials To Be Used, The Equipment To Be Installed And The Mode Of Construction. 1.27. The Start Date, As Specified In The Scc, Is The Date When The Contractor Is Obliged To Commence Execution Of The Works. It Does Not Necessarily Coincide With Any Of The Site Possession Dates. 1.28. A Subcontractor Is Any Person Or Organization To Whom A Part Of The Works Has Been Subcontracted By The Contractor, As Allowed By The Procuring Entity, But Not Any Assignee Of Such Person. 1.29. Temporary Works Are Works Designed, Constructed, Installed, And Removed By The Contractor That Are Needed For Construction Or Installation Of The Permanent Works. 1.30. Work(s)refer To The Permanent Works And Temporary Works To Be Executed By The Contractor In Accordance With This Contract, Including (i) The Furnishing Of All Labor, Materials, Equipment And Others Incidental, Necessary Or Convenient To The Complete Execution Of The Works; (ii) The Passing Of Any Tests Before Acceptance By The Procuring Entity’s Representative; (iii) And The Carrying Out Of All Duties And Obligations Of The Contractor Imposed By This Contract As Described In The Scc. 2. Interpretation 2.1. In Interpreting The Conditions Of Contract, Singular Also Means Plural, Male Also Means Female Or Neuter, And The Other Way Around. Headings Have No Significance. Words Have Their Normal Meaning Under The Language Of This Contract Unless Specifically Defined. The Procuring Entity’s Representative Will Provide Instructions Clarifying Queries About The Conditions Of Contract. 2.2. If Sectional Completion Is Specified In The Scc, References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Governing Language And Law 3.1. This Contract Has Been Executed In The English Language, Which Shall Be The Binding And Controlling Language For All Matters Relating To The Meaning Or Interpretation Of This Contract. All Correspondence And Other Documents Pertaining To This Contract Which Are Exchanged By The Parties Shall Be Written In English. 3.2. This Contract Shall Be Interpreted In Accordance With The Laws Of The Republic Of The Philippines. 4. Communications Communications Between Parties That Are Referred To In The Conditions Shall Be Effective Only When In Writing. A Notice Shall Be Effective Only When It Is Received By The Concerned Party. 5. Possession Of Site 5.1. On The Date Specified In The Scc, The Procuring Entity Shall Grant The Contractor Possession Of So Much Of The Site As May Be Required To Enable It To Proceed With The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 5.2. If Possession Of A Portion Is Not Given By The Date Stated In The Scc Clause 5.1, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contact Time To Address Such Delay Shall Be In Accordance With Gcc Clause 47. 5.3. The Contractor Shall Bear All Costs And Charges For Special Or Temporary Right-of-way Required By It In Connection With Access To The Site. The Contractor Shall Also Provide At His Own Cost Any Additional Facilities Outside The Site Required By It For Purposes Of The Works. 5.4. The Contractor Shall Allow The Procuring Entity’s Representative And Any Person Authorized By The Procuring Entity’s Representative Access To The Site And To Any Place Where Work In Connection With This Contract Is Being Carried Out Or Is Intended To Be Carried Out. 6. The Contractor’s Obligations 6.1. The Contractor Shall Carry Out The Works Properly And In Accordance With This Contract. The Contractor Shall Provide All Supervision, Labor, Materials, Plant And Contractor's Equipment, Which May Be Required. All Materials And Plant On Site Shall Be Deemed To Be The Property Of The Procuring Entity. 6.2. The Contractor Shall Commence Execution Of The Works On The Start Date And Shall Carry Out The Works In Accordance With The Program Of Work Submitted By The Contractor, As Updated With The Approval Of The Procuring Entity’s Representative, And Complete Them By The Intended Completion Date. 6.3. The Contractor Shall Be Responsible For The Safety Of All Activities On The Site. 6.4. The Contractor Shall Carry Out All Instructions Of The Procuring Entity’s Representative That Comply With The Applicable Laws Where The Site Is Located. 6.5. The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel, As Referred To In The Scc, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 6.6. If The Procuring Entity’s Representative Asks The Contractor To Remove A Member Of The Contractor’s Staff Or Work Force, For Justifiable Cause, The Contractor Shall Ensure That The Person Leaves The Site Within Seven (7) Days And Has No Further Connection With The Work In This Contract. 6.7. During Contract Implementation, The Contractor And His Subcontractors Shall Abide At All Times By All Labor Laws, Including Child Labor Related Enactments, And Other Relevant Rules. 6.8. The Contractor Shall Submit To The Procuring Entity For Consent The Name And Particulars Of The Person Authorized To Receive Instructions On Behalf Of The Contractor. 6.9. The Contractor Shall Cooperate And Share The Site With Other Contractors, Public Authorities, Utilities, And The Procuring Entity Between The Dates Given In The Schedule Of Other Contractors Particularly When They Shall Require Access To The Site. The Contractor Shall Also Provide Facilities And Services For Them During This Period. The Procuring Entity May Modify The Schedule Of Other Contractors, And Shall Notify The Contractor Of Any Such Modification Thereto. 6.10. Should Anything Of Historical Or Other Interest Or Of Significant Value Be Unexpectedly Discovered On The Site, It Shall Be The Property Of The Procuring Entity. The Contractor Shall Notify The Procuring Entity’s Representative Of Such Discoveries And Carry Out The Procuring Entity’s Representative’s Instructions In Dealing With Them. 7. Performance Security 7.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Contractor Shall Furnish The Performance Security In Any The Forms Prescribed In Itb Clause 32.2. 7.2. The Performance Security Posted In Favor Of The Procuring Entity Shall Be Forfeited In The Event It Is Established That The Contractor Is In Default In Any Of Its Obligations Under The Contract. 7.3. The Performance Security Shall Remain Valid Until Issuance By The Procuring Entity Of The Certificate Of Final Acceptance. 7.4. The Performance Security May Be Released By The Procuring Entity And Returned To The Contractor After The Issuance Of The Certificate Of Final Acceptance Subject To The Following Conditions: (a) There Are No Pending Claims Against The Contractor Or The Surety Company Filed By The Procuring Entity; (b) The Contractor Has No Pending Claims For Labor And Materials Filed Against It; And (c) Other Terms Specified In The Scc. 7.5. The Contractor Shall Post An Additional Performance Security Following The Amount And Form Specified In Itb Clause 32.2 To Cover Any Cumulative Increase Of More Than Ten Percent (10%) Over The Original Value Of The Contract As A Result Of Amendments To Order Or Change Orders, Extra Work Orders And Supplemental Agreements, As The Case May Be. The Contractor Shall Cause The Extension Of The Validity Of The Performance Security To Cover Approved Contract Time Extensions. 7.6. In Case Of A Reduction In The Contract Value Or For Partially Completed Works Under The Contract Which Are Usable And Accepted By The Procuring Entity The Use Of Which, In The Judgment Of The Implementing Agency Or The Procuring Entity, Will Not Affect The Structural Integrity Of The Entire Project, The Procuring Entity Shall Allow A Proportional Reduction In The Original Performance Security, Provided That Any Such Reduction Is More Than Ten Percent (10%) And That The Aggregate Of Such Reductions Is Not More Than Fifty Percent (50%) Of The Original Performance Security. 7.7. Unless Otherwise Indicated In The Scc, The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Act 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 8. Subcontracting 8.1. Unless Otherwise Indicated In The Scc, The Contractor Cannot Subcontract Works More Than The Percentage Specified In Itb Clause 8.1. 8.2. Subcontracting Of Any Portion Of The Works Does Not Relieve The Contractor Of Any Liability Or Obligation Under This Contract. The Contractor Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants Or Workmen. 8.3. Subcontractors Disclosed And Identified During The Bidding May Be Changed During The Implementation Of This Contract, Subject To Compliance With The Required Qualifications And The Approval Of The Procuring Entity. 9. Liquidated Damages 9.1. The Contractor Shall Pay Liquidated Damages To The Procuring Entity For Each Day That The Completion Date Is Later Than The Intended Completion Date. The Applicable Liquidated Damages Is At Least One-tenth (1/10) Of A Percent Of The Cost Of The Unperformed Portion For Every Day Of Delay. The Total Amount Of Liquidated Damages Shall Not Exceed Ten Percent (10%) Of The Amount Of The Contract. The Procuring Entity May Deduct Liquidated Damages From Payments Due To The Contractor. Payment Of Liquidated Damages Shall Not Affect The Contractor. Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of This Contract, The Procuring Entity Shall Rescind This Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. 9.2. If The Intended Completion Date Is Extended After Liquidated Damages Have Been Paid, The Engineer Of The Procuring Entity Shall Correct Any Overpayment Of Liquidated Damages By The Contractor By Adjusting The Next Payment Certificate. The Contractor Shall Be Paid Interest On The Overpayment, Calculated From The Date Of Payment To The Date Of Repayment, At The Rates Specified In Gcc Clause 40.3. 10. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 11. The Procuring Entity, Licenses And Permits The Procuring Entity Shall, If Requested By The Contractor, Assist Him In Applying For Permits, Licenses Or Approvals, Which Are Required For The Works. 12. Contractor’s Risk And Warranty Security 12.1. The Contractor Shall Assume Full Responsibility For The Works From The Time Project Construction Commenced Up To Final Acceptance By The Procuring Entity And Shall Be Held Responsible For Any Damage Or Destruction Of The Works Except Those Occasioned By Force Majeure. The Contractor Shall Be Fully Responsible For The Safety, Protection, Security, And Convenience Of His Personnel, Third Parties, And The Public At Large, As Well As The Works, Equipment, Installation, And The Like To Be Affected By His Construction Work. 12.2. The Defects Liability Period For Infrastructure Projects Shall Be One Year From Contract Completion Up To Final Acceptance By The Procuring Entity. During This Period, The Contractor Shall Undertake The Repair Works, At His Own Expense, Of Any Damage To The Works On Account Of The Use Of Materials Of Inferior Quality Within Ninety (90) Days From The Time The Head Of The Procuring Entity Has Issued An Order To Undertake Repair. In Case Of Failure Or Refusal To Comply With This Mandate, The Procuring Entity Shall Undertake Such Repair Works And Shall Be Entitled To Full Reimbursement Of Expenses Incurred Therein Upon Demand. 12.3. Unless Otherwise Indicated In The Scc, In Case The Contractor Fails To Comply With The Preceding Paragraph, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property (ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 12.4. After Final Acceptance Of The Works By The Procuring Entity, The Contractor Shall Be Held Responsible For “structural Defects”, I.e., Major Faults/flaws/deficiencies In One Or More Key Structural Elements Of The Project Which May Lead To Structural Failure Of The Completed Elements Or Structure, Or “structural Failures”, I.e., Where One Or More Key Structural Elements In An Infrastructure Facility Fails Or Collapses, Thereby Rendering The Facility Or Part Thereof Incapable Of Withstanding The Design Loads, And/or Endangering The Safety Of The Users Or The General Public: (a) Contractor – Where Structural Defects/failures Arise Due To Faults Attributable To Improper Construction, Use Of Inferior Quality/substandard Materials, And Any Violation Of The Contract Plans And Specifications, The Contractor Shall Be Held Liable; (b) Consultants – Where Structural Defects/failures Arise Due To Faulty And/or Inadequate Design And Specifications As Well As Construction Supervision, Then The Consultant Who Prepared The Design Or Undertook Construction Supervision For The Project Shall Be Held Liable; (c) Procuring Entity’s Representatives/project Manager/construction Managers And Supervisors – The Project Owner’s Representative(s), Project Manager, Construction Manager, And Supervisor(s) Shall Be Held Liable In Cases Where The Structural Defects/failures Are Due To His/their Willful Intervention In Altering The Designs And Other Specifications; Negligence Or Omission In Not Approving Or Acting On Proposed Changes To Noted Defects Or Deficiencies In The Design And/or Specifications; And The Use Of Substandard Construction Materials In The Project; (d) Third Parties - Third Parties Shall Be Held Liable In Cases Where Structural Defects/failures Are Caused By Work Undertaken By Them Such As Leaking Pipes, Diggings Or Excavations, Underground Cables And Electrical Wires, Underground Tunnel, Mining Shaft And The Like, In Which Case The Applicable Warranty To Such Structure Should Be Levied To Third Parties For Their Construction Or Restoration Works. (e) Users - In Cases Where Structural Defects/failures Are Due To Abuse/misuse By The End User Of The Constructed Facility And/or Non–compliance By A User With The Technical Design Limits And/or Intended Purpose Of The Same, Then The User Concerned Shall Be Held Liable. 12.5. The Warranty Against Structural Defects/failures, Except Those Occasioned On Force Majeure, Shall Cover The Period Specified In The Scc Reckoned From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. 12.6. The Contractor Shall Be Required To Put Up A Warranty Security In The Form Of Cash, Bank Guarantee, Letter Of Credit, Gsis Or Surety Bond Callable On Demand, In Accordance With The Following Schedule: Form Of Warranty Minimum Amount In Percentage (%) Of Total Contract Price (a) Cash Or Letter Of Credit Issued By Universal Or Commercial Bank: Provided, However, That The Letter Of Credit Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank Five Percent (5%) (b) Bank Guarantee Confirmed By Universal Or Commercial Bank: Provided, However, That The Letter Of Credit Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank Ten Percent (10%) (c) Surety Bond Callable Upon Demand Issued By Gsis Or Any Surety Or Insurance Company Duly Certified By The Insurance Commission Thirty Percent (30%) 12.7. The Warranty Security Shall Be Stated In Philippine Pesos And Shall Remain Effective For One Year From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity, And Returned Only After The Lapse Of Said One Year Period. 12.8. In Case Of Structural Defects/failure Occurring During The Applicable Warranty Period Provided In Gcc Clause 12.5, The Procuring Entity Shall Undertake The Necessary Restoration Or Reconstruction Works And Shall Be Entitled To Full Reimbursement By The Parties Found To Be Liable For Expenses Incurred Therein Upon Demand, Without Prejudice To The Filing Of Appropriate Administrative, Civil, And/or Criminal Charges Against The Responsible Persons As Well As The Forfeiture Of The Warranty Security Posted In Favor Of The Procuring Entity. 13. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. 14. Procuring Entity’s Risk 14.1. From The Start Date Until The Certificate Of Final Acceptance Has Been Issued, The Following Are Risks Of The Procuring Entity: (a) The Risk Of Personal Injury, Death, Or Loss Of Or Damage To Property (excluding The Works, Plant, Materials, And Equipment), Which Are Due To: (i) Any Type Of Use Or Occupation Of The Site Authorized By The Procuring Entity After The Official Acceptance Of The Works; Or (ii) Negligence, Breach Of Statutory Duty, Or Interference With Any Legal Right By The Procuring Entity Or By Any Person Employed By Or Contracted To Him Except The Contractor. (b) The Risk Of Damage To The Works, Plant, Materials, And Equipment To The Extent That It Is Due To A Fault Of The Procuring Entity Or In The Procuring Entity’s Design, Or Due To War Or Radioactive Contamination Directly Affecting The Country Where The Works Are To Be Executed. 15. Insurance 15.1. The Contractor Shall, Under His Name And At His Own Expense, Obtain And Maintain, For The Duration Of This Contract, The Following Insurance Coverage: (a) Contractor’s All Risk Insurance; (b) Transportation To The Project Site Of Equipment, Machinery, And Supplies Owned By The Contractor; (c) Personal Injury Or Death Of Contractor’s Employees; And (d) Comprehensive Insurance For Third Party Liability To Contractor’s Direct Or Indirect Act Or Omission Causing Damage To Third Persons. 15.2. The Contractor Shall Provide Evidence To The Procuring Entity’s Representative That The Insurances Required Under This Contract Have Been Effected And Shall, Within A Reasonable Time, Provide Copies Of The Insurance Policies To The Procuring Entity’s Representative. Such Evidence And Such Policies Shall Be Provided To The Procuring Entity’s Through The Procuring Entity’s Representative. 15.3. The Contractor Shall Notify The Insurers Of Changes In The Nature, Extent, Or Program For The Execution Of The Works And Ensure The Adequacy Of The Insurances At All Times In Accordance With The Terms Of This Contract And Shall Produce To The Procuring Entity’s Representative The Insurance Policies In Force Including The Receipts For Payment Of The Current Premiums. The Above Insurance Policies Shall Be Obtained From Any Reputable Insurance Company Approved By The Procuring Entity’s Representative. 15.4. If The Contractor Fails To Obtain And Keep In Force The Insurances Referred To Herein Or Any Other Insurance Which He May Be Required To Obtain Under The Terms Of This Contract, The Procuring Entity May Obtain And Keep In Force Any Such Insurances And Pay Such Premiums As May Be Necessary For The Purpose. From Time To Time, The Procuring Entity May Deduct The Amount It Shall Pay For Said Premiums Including Twenty Five Percent (25%) Therein From Any Monies Due, Or Which May Become Due, To The Contractor, Without Prejudice To The Procuring Entity Exercising Its Right To Impose Other Sanctions Against The Contractor Pursuant To The Provisions Of This Contract. 15.5. In The Event The Contractor Fails To Observe The Above Safeguards, The Procuring Entity May, At The Contractor’s Expense, Take Whatever Measure Is Deemed Necessary For Its Protection And That Of The Contractor’s Personnel And Third Parties, And/or Order The Interruption Of Dangerous Works. In Addition, The Procuring Entity May Refuse To Make The Payments Under Gcc Clause 40 Until The Contractor Complies With This Clause. 15.6. The Contractor Shall Immediately Replace The Insurance Policy Obtained As Required In This Contract, Without Need Of The Procuring Entity’s Demand, With A New Policy Issued By A New Insurance Company Acceptable To The Procuring Entity For Any Of The Following Grounds: (a) The Issuer Of The Insurance Policy To Be Replaced Has: (i) Become Bankrupt; (ii) Been Placed Under Receivership Or Under A Management Committee; (iii) Been Sued For Suspension Of Payment; Or (iv) Been Suspended By The Insurance Commission And Its License To Engage In Business Or Its Authority To Issue Insurance Policies Cancelled; Or (v) Where Reasonable Grounds Exist That The Insurer May Not Be Able, Fully And Promptly, To Fulfill Its Obligation Under The Insurance Policy. 16. Termination For Default Of Contractor 16.1. The Procuring Entity Shall Terminate This Contract For Default When Any Of The Following Conditions Attend Its Implementation: 16.2. Due To The Contractor’s Fault And While The Project Is On-going, It Has Incurred Negative Slippage Of Fifteen Percent (15%) Or More In Accordance With Presidential Decree 1870, Regardless Of Whether Or Not Previous Warnings And Notices Have Been Issued For The Contractor To Improve His Performance; 16.3. Due To Its Own Fault And After This Contract Time Has Expired, The Contractor Incurs Delay In The Completion Of The Work After This Contract Has Expired; Or 16.4. The Contractor: (a) Abandons The Contract Works, Refuses Or Fails To Comply With A Valid Instruction Of The Procuring Entity Or Fails To Proceed Expeditiously And Without Delay Despite A Written Notice By The Procuring Entity; (b) Does Not Actually Have On The Project Site The Minimum Essential Equipment Listed On The Bid Necessary To Prosecute The Works In Accordance With The Approved Program Of Work And Equipment Deployment Schedule As Required For The Project; (c) Does Not Execute The Works In Accordance With This Contract Or Persistently Or Flagrantly Neglects To Carry Out Its Obligations Under This Contract; (d) Neglects Or Refuses To Remove Materials Or To Perform A New Work That Has Been Rejected As Defective Or Unsuitable; Or (e) Sub-lets Any Part Of This Contract Without Approval By The Procuring Entity. 16.5. All Materials On The Site, Plant, Equipment, And Works Shall Be Deemed To Be The Property Of The Procuring Entity If This Contract Is Rescinded Because Of The Contractor’s Default. 17. Termination For Default Of Procuring Entity The Contractor May Terminate This Contract With The Procuring Entity If The Works Are Completely Stopped For A Continuous Period Of At Least Sixty (60) Calendar Days Through No Fault Of Its Own, Due To Any Of The Following Reasons: (a) Failure Of The Procuring Entity To Deliver, Within A Reasonable Time, Supplies, Materials, Right-of-way, Or Other Items It Is Obligated To Furnish Under The Terms Of This Contract; Or (b) The Prosecution Of The Work Is Disrupted By The Adverse Peace And Order Situation, As Certified By The Armed Forces Of The Philippines Provincial Commander And Approved By The Secretary Of National Defense. 18. Termination For Other Causes 18.1. The Procuring Entity May Terminate This Contract, In Whole Or In Part, At Any Time For Its Convenience. The Head Of The Procuring Entity May Terminate This Contract For The Convenience Of The Procuring Entity If He Has Determined The Existence Of Conditions That Make Project Implementation Economically, Financially Or Technically Impractical And/or Unnecessary, Such As, But Not Limited To, Fortuitous Event(s) Or Changes In Law And National Government Policies. 18.2. The Procuring Entity Or The Contractor May Terminate This Contract If The Other Party Causes A Fundamental Breach Of This Contract. 18.3. Fundamental Breaches Of Contract Shall Include, But Shall Not Be Limited To, The Following: (a) The Contractor Stops Work For Twenty Eight (28) Days When No Stoppage Of Work Is Shown On The Current Program Of Work And The Stoppage Has Not Been Authorized By The Procuring Entity’s Representative; (b) The Procuring Entity’s Representative Instructs The Contractor To Delay The Progress Of The Works, And The Instruction Is Not Withdrawn Within Twenty Eight (28) Days; (c) The Procuring Entity Shall Terminate This Contract If The Contractor Is Declared Bankrupt Or Insolvent As Determined With Finality By A Court Of Competent Jurisdiction. In This Event, Termination Will Be Without Compensation To The Contractor, Provided That Such Termination Will Not Prejudice Or Affect Any Right Of Action Or Remedy Which Has Accrued Or Will Accrue Thereafter To The Procuring Entity And/or The Contractor. In The Case Of The Contractor's Insolvency, Any Contractor's Equipment Which The Procuring Entity Instructs In The Notice Is To Be Used Until The Completion Of The Works; (d) A Payment Certified By The Procuring Entity’s Representative Is Not Paid By The Procuring Entity To The Contractor Within Eighty Four (84) Days From The Date Of The Procuring Entity’s Representative’s Certificate; (e) The Procuring Entity’s Representative Gives Notice That Failure To Correct A Particular Defect Is A Fundamental Breach Of Contract And The Contractor Fails To Correct It Within A Reasonable Period Of Time Determined By The Procuring Entity’s Representative; (f) The Contractor Does Not Maintain A Security, Which Is Required; (g) The Contractor Has Delayed The Completion Of The Works By The Number Of Days For Which The Maximum Amount Of Liquidated Damages Can Be Paid, As Defined In The Gcc Clause 9; And (h) In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To, The Following: (i) Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Defined In Itb Clause 3.1(a), Unless Otherwise Specified In The Scc; (ii) Drawing Up Or Using Forged Documents; (iii) Using Adulterated Materials, Means Or Methods, Or Engaging In Production Contrary To Rules Of Science Or The Trade; And (iv) Any Other Act Analogous To The Foregoing. 18.4. The Funding Source Or The Procuring Entity, As Appropriate, Will Seek To Impose The Maximum Civil, Administrative And/or Criminal Penalties Available Under The Applicable Law On Individuals And Organizations Deemed To Be Involved With Corrupt, Fraudulent, Or Coercive Practices. 18.5. When Persons From Either Party To This Contract Gives Notice Of A Fundamental Breach To The Procuring Entity’s Representative In Order To Terminate The Existing Contract For A Cause Other Than Those Listed Under Gcc Clause 18.3, The Procuring Entity’s Representative Shall Decide Whether The Breach Is Fundamental Or Not. 18.6. If This Contract Is Terminated, The Contractor Shall Stop Work Immediately, Make The Site Safe And Secure, And Leave The Site As Soon As Reasonably Possible. 19. Procedures For Termination Of Contracts 19.1. The Following Provisions Shall Govern The Procedures For The Termination Of This Contract: (a) Upon Receipt Of A Written Report Of Acts Or Causes Which May Constitute Ground(s) For Termination As Aforementioned, Or Upon Its Own Initiative, The Procuring Entity Shall, Within A Period Of Seven (7) Calendar Days, Verify The Existence Of Such Ground(s) And Cause The Execution Of A Verified Report, With All Relevant Evidence Attached; (b) Upon Recommendation By The Procuring Entity, The Head Of The Procuring Entity Shall Terminate This Contract Only By A Written Notice To The Contractor Conveying The Termination Of This Contract. The Notice Shall State: (i) That This Contract Is Being Terminated For Any Of The Ground(s) Afore-mentioned, And A Statement Of The Acts That Constitute The Ground(s) Constituting The Same; (ii) The Extent Of Termination, Whether In Whole Or In Part; (iii) An Instruction To The Contractor To Show Cause As To Why This Contract Should Not Be Terminated; And (iv) Special Instructions Of The Procuring Entity, If Any. The Notice To Terminate Shall Be Accompanied By A Copy Of The Verified Report; (c) Within A Period Of Seven (7) Calendar Days From Receipt Of The Notice Of Termination, The Contractor Shall Submit To The Head Of The Procuring Entity A Verified Position Paper Stating Why The Contract Should Not Be Terminated. If The Contractor Fails To Show Cause After The Lapse Of The Seven (7) Day Period, Either By Inaction Or By Default, The Head Of The Procuring Entity Shall Issue An Order Terminating The Contract; (d) The Procuring Entity May, At Anytime Before Receipt Of The Bidder’s Verified Position Paper Described In Item (c) Above Withdraw The Notice To Terminate If It Is Determined That Certain Items Or Works Subject Of The Notice Had Been Completed, Delivered, Or Performed Before The Contractor’s Receipt Of The Notice; (e) Within A Non-extendible Period Of Ten (10) Calendar Days From Receipt Of The Verified Position Paper, The Head Of The Procuring Entity Shall Decide Whether Or Not To Terminate This Contract. It Shall Serve A Written Notice To The Contractor Of Its Decision And, Unless Otherwise Provided In The Said Notice, This Contract Is Deemed Terminated From Receipt Of The Contractor Of The Notice Of Decision. The Termination Shall Only Be Based On The Ground(s) Stated In The Notice To Terminate; And (f) The Head Of The Procuring Entity May Create A Contract Termination Review Committee (ctrc) To Assist Him In The Discharge Of This Function. All Decisions Recommended By The Ctrc Shall Be Subject To The Approval Of The Head Of The Procuring Entity. 19.2. Pursuant To Section 69(f) Of Ra 9184 And Without Prejudice To The Imposition Of Additional Administrative Sanctions As The Internal Rules Of The Agency May Provide And/or Further Criminal Prosecution As Provided By Applicable Laws, The Procuring Entity Shall Impose On Contractors After The Termination Of The Contract The Penalty Of Suspension For One (1) Year For The First Offense, Suspension For Two (2) Years For The Second Offense From Participating In The Public Bidding Process, For Violations Committed During The Contract Implementation Stage, Which Include But Not Limited To The Following: (a) Failure Of The Contractor, Due Solely To His Fault Or Negligence, To Mobilize And Start Work Or Performance Within The Specified Period In The Notice To Proceed (“ntp”); (b) Failure By The Contractor To Fully And Faithfully Comply With Its Contractual Obligations Without Valid Cause, Or Failure By The Contractor To Comply With Any Written Lawful Instruction Of The Procuring Entity Or Its Representative(s) Pursuant To The Implementation Of The Contract. For The Procurement Of Infrastructure Projects Or Consultancy Contracts, Lawful Instructions Include But Are Not Limited To The Following: (i) Employment Of Competent Technical Personnel, Competent Engineers And/or Work Supervisors; (ii) Provision Of Warning Signs And Barricades In Accordance With Approved Plans And Specifications And Contract Provisions; (iii) Stockpiling In Proper Places Of All Materials And Removal From The Project Site Of Waste And Excess Materials, Including Broken Pavement And Excavated Debris In Accordance With Approved Plans And Specifications And Contract Provisions; (iv) Deployment Of Committed Equipment, Facilities, Support Staff And Manpower; And (v) Renewal Of The Effectivity Dates Of The Performance Security After Its Expiration During The Course Of Contract Implementation. (c) Assignment And Subcontracting Of The Contract Or Any Part Thereof Or Substitution Of Key Personnel Named In The Proposal Without Prior Written Approval By The Procuring Entity. (d) Poor Performance By The Contractor Or Unsatisfactory Quality And/or Progress Of Work Arising From His Fault Or Negligence As Reflected In The Constructor's Performance Evaluation System (“cpes”) Rating Sheet. In The Absence Of The Cpes Rating Sheet, The Existing Performance Monitoring System Of The Procuring Entity Shall Be Applied. Any Of The Following Acts By The Contractor Shall Be Construed As Poor Performance: (i) Negative Slippage Of 15% And Above Within The Critical Path Of The Project Due Entirely To The Fault Or Negligence Of The Contractor; And (ii) Quality Of Materials And Workmanship Not Complying With The Approved Specifications Arising From The Contractor's Fault Or Negligence. (e) Willful Or Deliberate Abandonment Or Non-performance Of The Project Or Contract By The Contractor Resulting To Substantial Breach Thereof Without Lawful And/or Just Cause. In Addition To The Penalty Of Suspension, The Performance Security Posted By The Contractor Shall Also Be Forfeited. 20. Force Majeure, Release From Performance 20.1. For Purposes Of This Contract The Terms “force Majeure” And “fortuitous Event” May Be Used Interchangeably. In This Regard, A Fortuitous Event Or Force Majeure Shall Be Interpreted To Mean An Event Which The Contractor Could Not Have Foreseen, Or Which Though Foreseen, Was Inevitable. It Shall Not Include Ordinary Unfavorable Weather Conditions; And Any Other Cause The Effects Of Which Could Have Been Avoided With The Exercise Of Reasonable Diligence By The Contractor. 20.2. If This Contract Is Discontinued By An Outbreak Of War Or By Any Other Event Entirely Outside The Control Of Either The Procuring Entity Or The Contractor, The Procuring Entity’s Representative Shall Certify That This Contract Has Been Discontinued. The Contractor Shall Make The Site Safe And Stop Work As Quickly As Possible After Receiving This Certificate And Shall Be Paid For All Works Carried Out Before Receiving It And For Any Work Carried Out Afterwards To Which A Commitment Was Made. 20.3. If The Event Continues For A Period Of Eighty Four (84) Days, Either Party May Then Give Notice Of Termination, Which Shall Take Effect Twenty Eight (28) Days After The Giving Of The Notice. 20.4. After Termination, The Contractor Shall Be Entitled To Payment Of The Unpaid Balance Of The Value Of The Works Executed And Of The Materials And Plant Reasonably Delivered To The Site, Adjusted By The Following: (a) Any Sum To Which The Contractor Is Entitled Under Gcc Clause 28; (b) The Cost Of His Suspension And Demobilization; (c) Any Sum To Which The Procuring Entity Is Entitled. 20.5. The Net Balance Due Shall Be Paid Or Repaid Within A Reasonable Time Period From The Time Of The Notice Of Termination. 21. Resolution Of Disputes 21.1. If Any Dispute Or Difference Of Any Kind Whatsoever Shall Arise Between The Parties In Connection With The Implementation Of The Contract Covered By The Act And This Irr, The Parties Shall Make Every Effort To Resolve Amicably Such Dispute Or Difference By Mutual Consultation. 21.2. If The Contractor Believes That A Decision Taken By The Procuring Entity’s Representative Was Either Outside The Authority Given To The Procuring Entity’s Representative By This Contract Or That The Decision Was Wrongly Taken, The Decision Shall Be Referred To The Arbiter Indicated In The Scc Within Fourteen (14) Days Of The Notification Of The Procuring Entity’s Representative’s Decision. 21.3. Any And All Disputes Arising From The Implementation Of This Contract Covered By The R.a. 9184 And Its Irr Shall Be Submitted To Arbitration In The Philippines According To The Provisions Of Republic Act No. 876, Otherwise Known As The “ Arbitration Law” And Republic Act 9285, Otherwise Known As The “alternative Dispute Resolution Act Of 2004”: Provided, However, That, Disputes That Are Within The Competence Of The Construction Industry Arbitration Commission To Resolve Shall Be Referred Thereto. The Process Of Arbitration Shall Be Incorporated As A Provision In This Contract That Will Be Executed Pursuant To The Provisions Of The Act And Its Irr: Provided, Further, That, By Mutual Agreement, The Parties May Agree In Writing To Resort To Other Alternative Modes Of Dispute Resolution. 22. Suspension Of Loan, Credit, Grant, Or Appropriation In The Event That The Funding Source Suspends The Loan, Credit, Grant, Or Appropriation To The Procuring Entity, From Which Part Of The Payments To The Contractor Are Being Made: (a) The Procuring Entity Is Obligated To Notify The Contractor Of Such Suspension Within Seven (7) Days Of Having Received The Suspension Notice. (b) If The Contractor Has Not Received Sums Due It For Work Already Done Within Forty Five (45) Days From The Time The Contractor’s Claim For Payment Has Been Certified By The Procuring Entity’s Representative, The Contractor May Immediately Issue A Suspension Of Work Notice In Accordance With Gcc Clause 45.2. 23. Procuring Entity’s Representative’s Decisions 23.1. Except Where Otherwise Specifically Stated, The Procuring Entity’s Representative Will Decide Contractual Matters Between The Procuring Entity And The Contractor In The Role Representing The Procuring Entity. 23.2. The Procuring Entity’s Representative May Delegate Any Of His Duties And Responsibilities To Other People, Except To The Arbiter, After Notifying The Contractor, And May Cancel Any Delegation After Notifying The Contractor. 24. Approval Of Drawings And Temporary Works By The Procuring Entity’s Representative 24.1. All Drawings Prepared By The Contractor For The Execution Of The Temporary Works, Are Subject To Prior Approval By The Procuring Entity’s Representative Before Its Use. 24.2. The Contractor Shall Be Responsible For Design Of Temporary Works. 24.3. The Procuring Entity’s Representative’s Approval Shall Not Alter The Contractor’s Responsibility For Design Of The Temporary Works. 24.4. The Contractor Shall Obtain Approval Of Third Parties To The Design Of The Temporary Works, When Required By The Procuring Entity. 25. Acceleration And Delays Ordered By The Procuring Entity’s Representative 25.1. When The Procuring Entity Wants The Contractor To Finish Before The Intended Completion Date, The Procuring Entity’s Representative Will Obtain Priced Proposals For Achieving The Necessary Acceleration From The Contractor. If The Procuring Entity Accepts These Proposals, The Intended Completion Date Will Be Adjusted Accordingly And Confirmed By Both The Procuring Entity And The Contractor. 25.2. If The Contractor’s Financial Proposals For An Acceleration Are Accepted By The Procuring Entity, They Are Incorporated In The Contract Price And Treated As A Variation. 26. Extension Of The Intended Completion Date 26.1. The Procuring Entity’s Representative Shall Extend The Intended Completion Date If A Variation Is Issued Which Makes It Impossible For The Intended Completion Date To Be Achieved By The Contractor Without Taking Steps To Accelerate The Remaining Work, Which Would Cause The Contractor To Incur Additional Costs. No Payment Shall Be Made For Any Event Which May Warrant The Extension Of The Intended Completion Date. 26.2. The Procuring Entity’s Representative Shall Decide Whether And By How Much To Extend The Intended Completion Date Within Twenty One (21) Days Of The Contractor Asking The Procuring Entity’s Representative For A Decision Thereto After Fully Submitting All Supporting Information. If The Contractor Has Failed To Give Early Warning Of A Delay Or Has Failed To Cooperate In Dealing With A Delay, The Delay By This Failure Shall Not Be Considered In Assessing The New Intended Completion Date. 27. Right To Vary 27.1. The Procuring Entity’s Representative With The Prior Approval Of The Procuring Entity May Instruct Variations, Up To A Maximum Cumulative Amount Of Ten Percent (10%) Of The Original Contract Cost. 27.2. Variations Shall Be Valued As Follows: (a) At A Lump Sum Price Agreed Between The Parties; (b) Where Appropriate, At Rates In This Contract; (c) In The Absence Of Appropriate Rates, The Rates In This Contract Shall Be Used As The Basis For Valuation; Or Failing Which (d) At Appropriate New Rates, Equal To Or Lower Than Current Industry Rates And To Be Agreed Upon By Both Parties And Approved By The Head Of The Procuring Entity. 28. Contractor's Right To Claim If The Contractor Incurs Cost As A Result Of Any Of The Events Under Gcc Clause 13, The Contractor Shall Be Entitled To The Amount Of Such Cost. If As A Result Of Any Of The Said Events, It Is Necessary To Change The Works, This Shall Be Dealt With As A Variation. 29. Dayworks 29.1. Subject To Gcc Clause 43 On Variation Order, And If Applicable As Indicated In The Scc, The Day Works Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 29.2. All Work To Be Paid For As Day Works Shall Be Recorded By The Contractor On Forms Approved By The Procuring Entity’s Representative. Each Completed Form Shall Be Verified And Signed By The Procuring Entity’s Representative Within Two Days Of The Work Being Done. 29.3. The Contractor Shall Be Paid For Day Works Subject To Obtaining Signed Dayworks Forms. 30. Early Warning 30.1. The Contractor Shall Warn The Procuring Entity’s Representative At The Earliest Opportunity Of Specific Likely Future Events Or Circumstances That May Adversely Affect The Quality Of The Work, Increase The Contract Price, Or Delay The Execution Of The Works. The Procuring Entity’s Representative May Require The Contractor To Provide An Estimate Of The Expected Effect Of The Future Event Or Circumstance On The Contract Price And Completion Date. The Estimate Shall Be Provided By The Contractor As Soon As Reasonably Possible. 30.2. The Contractor Shall Cooperate With The Procuring Entity’s Representative In Making And Considering Proposals For How The Effect Of Such An Event Or Circumstance Can Be Avoided Or Reduced By Anyone Involved In The Work And In Carrying Out Any Resulting Instruction Of The Procuring Entity’s Representative. 31. Program Of Work 31.1. Within The Time Stated In The Scc, The Contractor Shall Submit To The Procuring Entity’s Representative For Approval A Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. 31.2. An Update Of The Program Of Work Shall The Show The Actual Progress Achieved On Each Activity And The Effect Of The Progress Achieved On The Timing Of The Remaining Work, Including Any Changes To The Sequence Of The Activities. 31.3. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 31.4. The Procuring Entity’s Representative’s Approval Of The Program Of Work Shall Not Alter The Contractor’s Obligations. The Contractor May Revise The Program Of Work And Submit It To The Procuring Entity’s Representative Again At Any Time. A Revised Program Of Work Shall Show The Effect Of Any Approved Variations. 31.5. When The Program Of Work Is Updated, The Contractor Shall Provide The Procuring Entity’s Representative With An Updated Cash Flow Forecast. The Cash Flow Forecast Shall Include Different Currencies, As Defined In The Contract, Converted As Necessary Using The Contract Exchange Rates. 31.6. All Variations Shall Be Included In Updated Program Of Work Produced By The Contractor. 32. Management Conferences 32.1. Either The Procuring Entity’s Representative Or The Contractor May Require The Other To Attend A Management Conference. The Management Conference Shall Review The Plans For Remaining Work And Deal With Matters Raised In Accordance With The Early Warning Procedure. 32.2. The Procuring Entity’s Representative Shall Record The Business Of Management Conferences And Provide Copies Of The Record To Those Attending The Conference And To The Procuring Entity . The Responsibility Of The Parties For Actions To Be Taken Shall Be Decided By The Procuring Entity’s Representative Either At The Management Conference Or After The Management Conference And Stated In Writing To All Who Attended The Conference. 33. Bill Of Quantities 33.1. The Bill Of Quantities Shall Contain Items Of Work For The Construction, Installation, Testing, And Commissioning Of Work To Be Done By The Contractor. 33.2. The Bill Of Quantities Is Used To Calculate The Contract Price. The Contractor Is Paid For The Quantity Of The Work Done At The Rate In The Bill Of Quantities For Each Item. 33.3. If The Final Quantity Of Any Work Done Differs From The Quantity In The Bill Of Quantities For The Particular Item And Is Not More Than Twenty Five Percent (25%) Of The Original Quantity, Provided The Aggregate Changes For All Items Do Not Exceed Ten Percent (10%) Of The Contract Price, The Procuring Entity’s Representative Shall Make The Necessary Adjustments To Allow For The Changes Subject To Applicable Laws, Rules, And Regulations. 33.4. If Requested By The Procuring Entity’s Representative, The Contractor Shall Provide The Procuring Entity’s Representative With A Detailed Cost Breakdown Of Any Rate In The Bill Of Quantities. 34. Instructions, Inspections And Audits 34.1. The Procuring Entity’s Personnel Shall At All Reasonable Times During Construction Of The Work Be Entitled To Examine, Inspect, Measure And Test The Materials And Workmanship, And To Check The Progress Of The Construction. 34.2. If The Procuring Entity’s Representative Instructs The Contractor To Carry Out A Test Not Specified In The Specification To Check Whether Any Work Has A Defect And The Test Shows That It Does, The Contractor Shall Pay For The Test And Any Samples. If There Is No Defect, The Test Shall Be A Compensation Event. 34.3. The Contractor Shall Permit The Funding Source Named In The Scc To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Appointed By The Funding Source, If So Required By The Funding Source. 35. Identifying Defects The Procuring Entity’s Representative Shall Check The Contractor’s Work And Notify The Contractor Of Any Defects That Are Found. Such Checking Shall Not Affect The Contractor’s Responsibilities. The Procuring Entity’s Representative May Instruct The Contractor To Search Uncover Defects And Test Any Work That The Procuring Entity’s Representative Considers Below Standards And Defective. 36. Cost Of Repairs Loss Or Damage To The Works Or Materials To Be Incorporated In The Works Between The Start Date And The End Of The Defects Liability Periods Shall Be Remedied By The Contractor At The Contractor’s Cost If The Loss Or Damage Arises From The Contractor’s Acts Or Omissions. 37. Correction Of Defects 37.1. The Procuring Entity’s Representative Shall Give Notice To The Contractor Of Any Defects Before The End Of The Defects Liability Period, Which Isone (1) Year From Project Completion Up To Final Acceptance By The Procuring Entity’s. 37.2. Every Time Notice Of A Defect Is Given, The Contractor Shall Correct The Notified Defect Within The Length Of Time Specified In The Procuring Entity’s Representative’s Notice. 37.3. The Contractor Shall Correct The Defects Which He Notices Himself Before The End Of The Defects Liability Period. 37.4. The Procuring Entity Shall Certify That All Defects Have Been Corrected. If The Procuring Entity Considers That Correction Of A Defect Is Not Essential, He Can Request The Contractor To Submit A Quotation For The Corresponding Reduction In The Contract Price. If The Procuring Entity Accepts The Quotation, The Corresponding Change In The Scc Is A Variation. 38. Uncorrected Defects 38.1. The Procuring Entity Shall Give The Contractor At Least Fourteen (14) Days Notice Of His Intention To Use A Third Party To Correct A Defect. If The Contractor Does Not Correct The Defect Himself Within The Period, The Procuring Entity May Have The Defect Corrected By The Third Party. The Cost Of The Correction Will Be Deducted From The Contract Price. 38.2. The Use Of A Third Party To Correct Defects That Are Uncorrected By The Contractor Will In No Way Relieve The Contractor Of Its Liabilities And Warranties Under The Contract. 39. Advance Payment 39.1. The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum Or, At The Most Two, Installments According To A Schedule Specified In The Scc. 39.2. The Advance Payment Shall Be Made Only Upon The Submission To And Acceptance By The Procuring Entity Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, A Bank Guarantee Or A Surety Bond Callable Upon Demand, Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission And Confirmed By The Procuring Entity. 39.3. The Advance Payment Shall Be Repaid By The Contractor By An Amount Equal To The Percentage Of The Total Contract Price Used For The Advance Payment. 39.4. The Contractor May Reduce His Standby Letter Of Credit Or Guarantee Instrument By The Amounts Refunded By The Monthly Certificates In The Advance Payment. 39.5. The Procuring Entity Will Provide An Advance Payment On The Contract Price As Stipulated In The Conditions Of Contract, Subject To The Maximum Amount Stated In Scc Clause 39.1. 40. Progress Payments 40.1. The Contractor May Submit A Request For Payment For Work Accomplished. Such Request For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 40.2. The Procuring Entity Shall Deduct The Following From The Certified Gross Amounts To Be Paid To The Contractor As Progress Payment: (a) Cumulative Value Of The Work Previously Certified And Paid For. (b) Portion Of The Advance Payment To Be Recouped For The Month. (c) Retention Money In Accordance With The Condition Of Contract. (d) Amount To Cover Third Party Liabilities. (e) Amount To Cover Uncorrected Discovered Defects In The Works. 40.3. Payments Shall Be Adjusted By Deducting There From The Amounts For Advance Payments And Retention. The Procuring Entity Shall Pay The Contractor The Amounts Certified By The Procuring Entity’s Representative Within Twenty Eight (28) Days From The Date Each Certificate Was Issued. No Payment Of Interest For Delayed Payments And Adjustments Shall Be Made By The Procuring Entity. 40.4. The First Progress Payment May Be Paid By The Procuring Entity To The Contractor Provided That At Least Twenty Percent (20%) Of The Work Has Been Accomplished As Certified By The Procuring Entity’s Representative. 40.5. Items Of The Works For Which A Price Of “0” (zero) Has Been Entered Will Not Be Paid For By The Procuring Entity And Shall Be Deemed Covered By Other Rates And Prices In The Contract. 41. Payment Certificates 41.1. The Contractor Shall Submit To The Procuring Entity’s Representative Monthly Statements Of The Estimated Value Of The Work Executed Less The Cumulative Amount Certified Previously. 41.2. The Procuring Entity’s Representative Shall Check The Contractor’s Monthly Statement And Certify The Amount To Be Paid To The Contractor. 41.3. The Value Of Work Executed Shall: (a) Be Determined By The Procuring Entity’s Representative; (b) Comprise The Value Of The Quantities Of The Items In The Bill Of Quantities Completed; And (c) Include The Valuations Of Approved Variations. 41.4. The Procuring Entity’s Representative May Exclude Any Item Certified In A Previous Certificate Or Reduce The Proportion Of Any Item Previously Certified In Any Certificate In The Light Of Later Information. 42. Retention 42.1. The Procuring Entity Shall Retain From Each Payment Due To The Contractor An Amount Equal To A Percentage Thereof Using The Rate As Specified In Itb Sub-clause 42.2. 42.2. Progress Payments Are Subject To Retention Of Ten Percent (10%), Referred To As The “retention Money.” Such Retention Shall Be Based On The Total Amount Due To The Contractor Prior To Any Deduction And Shall Be Retained From Every Progress Payment Until Fifty Percent (50%) Of The Value Of Works, As Determined By The Procuring Entity, Are Completed. If, After Fifty Percent (50%) Completion, The Work Is Satisfactorily Done And On Schedule, No Additional Retention Shall Be Made; Otherwise, The Ten Percent (10%) Retention Shall Again Be Imposed Using The Rate Specified Therefore. 42.3. The Total “retention Money” Shall Be Due For Release Upon Final Acceptance Of The Works. The Contractor May, However, Request The Substitution Of The Retention Money For Each Progress Billing With Irrevocable Standby Letters Of Credit From A Commercial Bank, Bank Guarantees Or Surety Bonds Callable On Demand, Of Amounts Equivalent To The Retention Money Substituted For And Acceptable To The Procuring Entity, Provided That The Project Is On Schedule And Is Satisfactorily Undertaken. Otherwise, The Ten (10%) Percent Retention Shall Be Made. Said Irrevocable Standby Letters Of Credit, Bank Guarantees And/or Surety Bonds, To Be Posted In Favor Of The Government Shall Be Valid For A Duration To Be Determined By The Concerned Implementing Office/agency Or Procuring Entity And Will Answer For The Purpose For Which The Ten (10%) Percent Retention Is Intended, I.e., To Cover Uncorrected Discovered Defects And Third Party Liabilities. 42.4. On Completion Of The Whole Works, The Contractor May Substitute Retention Money With An “on Demand” Bank Guarantee In A Form Acceptable To The Procuring Entity. 43. Variation Orders 43.1. Variation Orders May Be Issued By The Procuring Entity To Cover Any Increase/decrease In Quantities, Including The Introduction Of New Work Items That Are Not Included In The Original Contract Or Reclassification Of Work Items That Are Either Due To Change Of Plans, Design Or Alignment To Suit Actual Field Conditions Resulting In Disparity Between The Preconstruction Plans Used For Purposes Of Bidding And The “as Staked Plans” Or Construction Drawings Prepared After A Joint Survey By The Contractor And The Procuring Entity After Award Of The Contract, Provided That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. The Addition/deletion Of Works Should Be Within The General Scope Of The Project As Bid And Awarded. The Scope Of Works Shall Not Be Reduced So As To Accommodate A Positive Variation Order. A Variation Order May Either Be In The Form Of A Change Order Or Extra Work Order. 43.2. A Change Order May Be Issued By The Procuring Entity To Cover Any Increase/decrease In Quantities Of Original Work Items In The Contract. 43.3. An Extra Work Order May Be Issued By The Procuring Entity To Cover The Introduction Of New Work Necessary For The Completion, Improvement Or Protection Of The Project Which Were Not Included As Items Of Work In The Original Contract, Such As, Where There Are Subsurface Or Latent Physical Conditions At The Site Differing Materially From Those Indicated In The Contract, Or Where There Are Duly Unknown Physical Conditions At The Site Of An Unusual Nature Differing Materially From Those Ordinarily Encountered And Generally Recognized As Inherent In The Work Or Character Provided For In The Contract. 43.4. Any Cumulative Variation Order Beyond Ten Percent (10%) Shall Be Subject Of Another Contract To Be Bid Out If The Works Are Separable From The Original Contract. In Exceptional Cases Where It Is Urgently Necessary To Complete The Original Scope Of Work, The Head Of The Procuring Entity May Authorize A Positive Variation Order Go Beyond Ten Percent (10%) But Not More Than Twenty Percent (20%) Of The Original Contract Price, Subject To The Guidelines To Be Determined By The Gppb: Provided, However, That Appropriate Sanctions Shall Be Imposed On The Designer, Consultant Or Official Responsible For The Original Detailed Engineering Design Which Failed To Consider The Variation Order Beyond Ten Percent (10%). 43.5. In Claiming For Any Variation Order, The Contractor Shall, Within Seven (7) Calendar Days After Such Work Has Been Commenced Or After The Circumstances Leading To Such Condition(s) Leading To The Extra Cost, And Within Twenty-eight (28) Calendar Days Deliver A Written Communication Giving Full And Detailed Particulars Of Any Extra Cost In Order That It May Be Investigated At That Time. Failure To Provide Either Of Such Notices In The Time Stipulated Shall Constitute A Waiver By The Contractor For Any Claim. The Preparation And Submission Of Variation Orders Are As Follows: (a) If The Procuring Entity’s Representative/project Engineer Believes That A Change Order Or Extra Work Order Should Be Issued, He Shall Prepare The Proposed Order Accompanied With The Notices Submitted By The Contractor, The Plans Therefore, His Computations As To The Quantities Of The Additional Works Involved Per Item Indicating The Specific Stations Where Such Works Are Needed, The Date Of His Inspections And Investigations Thereon, And The Log Book Thereof, And A Detailed Estimate Of The Unit Cost Of Such Items Of Work, Together With His Justifications For The Need Of Such Change Order Or Extra Work Order, And Shall Submit The Same To The Head Of The Procuring Entity For Approval. (b) The Head Of The Procuring Entity Or His Duly Authorized Representative, Upon Receipt Of The Proposed Change Order Or Extra Work Order Shall Immediately Instruct The Technical Staff Of The Procuring Entity’s To Conduct An On-the-spot Investigation To Verify The Need For The Work To Be Prosecuted. A Report Of Such Verification Shall Be Submitted Directly To The Head Of The Procuring Entity Or His Duly Authorized Representative. (c) The, Head Of The Procuring Entity Or His Duly Authorized Representative, After Being Satisfied That Such Change Order Or Extra Work Order Is Justified And Necessary, Shall Review The Estimated Quantities And Prices And Forward The Proposal With The Supporting Documentation To The Head Of Procuring Entity For Consideration. (d) If, After Review Of The Plans, Quantities And Estimated Unit Cost Of The Items Of Work Involved, The Proper Office Of The Procuring Entity Empowered To Review And Evaluate Change Orders Or Extra Work Orders Recommends Approval Thereof, Head Of The Procuring Entity Or His Duly Authorized Representative, Believing The Change Order Or Extra Work Order To Be In Order, Shall Approve The Same. (e) The Timeframe For The Processing Of Variation Orders From The Preparation Up To The Approval By The Head Of The Procuring Entity Concerned Shall Not Exceed Thirty (30) Calendar Days. 44. Contract Completion Once The Project Reaches An Accomplishment Of Ninety Five (95%) Of The Total Contract Amount, The Procuring Entity May Create An Inspectorate Team To Make Preliminary Inspection And Submit A Punch-list To The Contractor In Preparation For The Final Turnover Of The Project. Said Punch-list Will Contain, Among Others, The Remaining Works, Work Deficiencies For Necessary Corrections, And The Specific Duration/time To Fully Complete The Project Considering The Approved Remaining Contract Time. This, However, Shall Not Preclude The Claim Of The Procuring Entity For Liquidated Damages. 45. Suspension Of Work 45.1. The Procuring Entity Shall Have The Authority To Suspend The Work Wholly Or Partly By Written Order For Such Period As May Be Deemed Necessary, Due To Force Majeure Or Any Fortuitous Events Or For Failure On The Part Of The Contractor To Correct Bad Conditions Which Are Unsafe For Workers Or For The General Public, To Carry Out Valid Orders Given By The Procuring Entity Or To Perform Any Provisions Of The Contract, Or Due To Adjustment Of Plans To Suit Field Conditions As Found Necessary During Construction. The Contractor Shall Immediately Comply With Such Order To Suspend The Work Wholly Or Partly. 45.2. The Contractor Or Its Duly Authorized Representative Shall Have The Right To Suspend Work Operation On Any Or All Projects/activities Along The Critical Path Of Activities After Fifteen (15) Calendar Days From Date Of Receipt Of Written Notice From The Contractor To The District Engineer/regional Director/consultant Or Equivalent Official, As The Case May Be, Due To The Following: (a) There Exist Right-of-way Problems Which Prohibit The Contractor From Performing Work In Accordance With The Approved Construction Schedule. (b) Requisite Construction Plans Which Must Be Owner-furnished Are Not Issued To The Contractor Precluding Any Work Called For By Such Plans. (c) Peace And Order Conditions Make It Extremely Dangerous, If Not Possible, To Work. However, This Condition Must Be Certified In Writing By The Philippine National Police (pnp) Station Which Has Responsibility Over The Affected Area And Confirmed By The Department Of Interior And Local Government (dilg) Regional Director. (d) There Is Failure On The Part Of The Procuring Entity To Deliver Government-furnished Materials And Equipment As Stipulated In The Contract. (e) Delay In The Payment Of Contractor’s Claim For Progress Billing Beyond Forty-five (45) Calendar Days From The Time The Contractor’s Claim Has Been Certified To By The Procuring Entity’s Authorized Representative That The Documents Are Complete Unless There Are Justifiable Reasons Thereof Which Shall Be Communicated In Writing To The Contractor. 45.3. In Case Of Total Suspension, Or Suspension Of Activities Along The Critical Path, Which Is Not Due To Any Fault Of The Contractor, The Elapsed Time Between The Effective Order Of Suspending Operation And The Order To Resume Work Shall Be Allowed The Contractor By Adjusting The Contract Time Accordingly. 46. Payment On Termination 46.1. If The Contract Is Terminated Because Of A Fundamental Breach Of Contract By The Contractor, The Procuring Entity’s Representative Shall Issue A Certificate For The Value Of The Work Done And Materials Ordered Less Advance Payments Received Up To The Date Of The Issue Of The Certificate And Less The Percentage To Apply To The Value Of The Work Not Completed, As Indicated In The Scc. Additional Liquidated Damages Shall Not Apply. If The Total Amount Due To The Procuring Entity Exceeds Any Payment Due To The Contractor, The Difference Shall Be A Debt Payable To The Procuring Entity. 46.2. If The Contract Is Terminated For The Procuring Entity’s Convenience Or Because Of A Fundamental Breach Of Contract By The Procuring Entity, The Procuring Entity’s Representative Shall Issue A Certificate For The Value Of The Work Done, Materials Ordered, The Reasonable Cost Of Removal Of Equipment, Repatriation Of The Contractor’s Personnel Employed Solely On The Works, And The Contractor’s Costs Of Protecting And Securing The Works, And Less Advance Payments Received Up To The Date Of The Certificate. 46.3. The Net Balance Due Shall Be Paid Or Repaid Within Twenty Eight (28) Days From The Notice Of Termination. 46.4. If The Contractor Has Terminated The Contract Under Gcc Clauses 17 Or 18, The Procuring Entity Shall Promptly Return The Performance Security To The Contractor. 47. Extension Of Contract Time 47.1. Should The Amount Of Additional Work Of Any Kind Or Other Special Circumstances Of Any Kind Whatsoever Occur Such As To Fairly Entitle The Contractor To An Extension Of Contract Time, The Procuring Entity Shall Determine The Amount Of Such Extension; Provided That The Procuring Entity Is Not Bound To Take Into Account Any Claim For An Extension Of Time Unless The Contractor Has, Prior To The Expiration Of The Contract Time And Within Thirty (30) Calendar Days After Such Work Has Been Commenced Or After The Circumstances Leading To Such Claim Have Arisen, Delivered To The Procuring Entity Notices In Order That It Could Have Investigated Them At That Time. Failure To Provide Such Notice Shall Constitute A Waiver By The Contractor Of Any Claim. Upon Receipt Of Full And Detailed Particulars, The Procuring Entity Shall Examine The Facts And Extent Of The Delay And Shall Extend The Contract Time Completing The Contract Work When, In The Procuring Entity’s Opinion, The Findings Of Facts Justify An Extension. 47.2. No Extension Of Contract Time Shall Be Granted The Contractor Due To (a) Ordinary Unfavorable Weather Conditions And (b) Inexcusable Failure Or Negligence Of Contractor To Provide The Required Equipment, Supplies Or Materials. 47.3. Extension Of Contract Time May Be Granted Only When The Affected Activities Fall Within The Critical Path Of The Pert/cpm Network. 47.4. No Extension Of Contract Time Shall Be Granted When The Reason Given To Support The Request For Extension Was Already Considered In The Determination Of The Original Contract Time During The Conduct Of Detailed Engineering And In The Preparation Of The Contract Documents As Agreed Upon By The Parties Before Contract Perfection. 47.5. Extension Of Contract Time Shall Be Granted For Rainy/unworkable Days Considered Unfavorable For The Prosecution Of The Works At The Site, Based On The Actual Conditions Obtained At The Site, In Excess Of The Number Of Rainy/unworkable Days Pre-determined By The Procuring Entity In Relation To The Original Contract Time During The Conduct Of Detailed Engineering And In The Preparation Of The Contract Documents As Agreed Upon By The Parties Before Contract Perfection, And/or For Equivalent Period Of Delay Due To Major Calamities Such As Exceptionally Destructive Typhoons, Floods And Earthquakes, And Epidemics, And For Causes Such As Non-delivery On Time Of Materials, Working Drawings, Or Written Information To Be Furnished By The Procuring Entity, Non-acquisition Of Permit To Enter Private Properties Within The Right-of-way Resulting In Complete Paralyzation Of Construction Activities, And Other Meritorious Causes As Determined By The Procuring Entity’s Representative And Approved By The Head Of The Procuring Entity. Shortage Of Construction Materials, General Labor Strikes, And Peace And Order Problems That Disrupt Construction Operations Through No Fault Of The Contractor May Be Considered As Additional Grounds For Extension Of Contract Time Provided They Are Publicly Felt And Certified By Appropriate Government Agencies Such As Dti, Dole, Dilg, And Dnd, Among Others. The Written Consent Of Bondsmen Must Be Attached To Any Request Of The Contractor For Extension Of Contract Time And Submitted To The Procuring Entity For Consideration And The Validity Of The Performance Security Shall Be Correspondingly Extended. 48. Price Adjustment Except For Extraordinary Circumstances As Determined By Neda And Approved By The Gppb, No Price Adjustment Shall Be Allowed. Nevertheless, In Cases Where The Cost Of The Awarded Contract Is Affected By Any Applicable New Laws, Ordinances, Regulations, Or Other Acts Of The Gop, Promulgated After The Date Of Bid Opening, A Contract Price Adjustment Shall Be Made Or Appropriate Relief Shall Be Applied On A No Loss-no Gain Basis. 49. Completion The Contractor Shall Request The Procuring Entity’s Representative To Issue A Certificate Of Completion Of The Works, And The Procuring Entity’s Representative Will Do So Upon Deciding That The Work Is Completed. 50. Taking Over The Procuring Entity Shall Take Over The Site And The Works Within Seven (7) Days From The Date The Procuring Entity’s Representative Issues A Certificate Of Completion. 51. Operating And Maintenance Manuals 51.1. If “as Built” Drawings And/or Operating And Maintenance Manuals Are Required, The Contractor Shall Supply Them By The Dates Stated In The Scc. 51.2. If The Contractor Does Not Supply The Drawings And/or Manuals By The Dates Stated In The Scc, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative Shall Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Gcc Clause 1.16 The Intended Completion Date Is 60 Cd From Ntp. 1.21 The Procuring Entity Is Lgu- Mapanas, Northern Samar. 1.22 The Procuring Entity’s Representative Is Atty. Ronn Michael L. Tejano Municipal Mayor Municipality Of Mapanas Province Of Northern Samar 1.23 The Site Is Located At Mapanas, Northern Samar. 1.27 The Start Date Is: Upon Receipt Of Notice To Proceed. 1.30 The Works Consist Of: Item No. Scope Of Work Quantity Unit Rehabilitation / Improvement Of Longcop St. Barangay E. Laodenio, Mapanas, Northern Samar Part B Other General Requirements B.5 Projects Billboard/sign Board 1.00 Each B.7(2) Occupational Safety And Health Program 1.00 L.s B.9 Mobilization/demobilization 1.00 L.s Part C Earthworks 101(3)a.2 Removal Existing Pcc Pavement, 0.2m Thk (pcc Reblocking At Intermittent 410.00 Sq.m 102(2)b Surplus Common Excavation 123.00 Cu.m 105(1) Subgrade Preparation (common Materials) 492.00 Sq.m Part D Subbase And Base Course 200(1) Aggregate Subbase Course 89.30 Cu.m 201(1) Aggregate Base Course 98.40 Cu.m Part E Surface Courses 311(1)a.2 Pcc Pavement (plain) Convention Method, 200mm Thk 410.00 Sq.m 2.2 Note: The Items To Follow 5.1 The Procuring Entity Shall Give Possession Of All Parts Of The Site To The Contractor Upon The Issuance Of Notice To Proceed. 6.5 The Contractor Shall Employ The Following Key Personnel: Key Personnel Number Civil Engineer 1 Construction Foreman 1 Labor Workers 3 7.4(c) “no Further Instructions”. 7.7 No Further Instructions. 8.1 No Further Instructions. 10 The Site Investigation Reports Are: None 12.3 No Further Instructions. 12.5 In Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures: Five (5) Years. 13 “no Additional Provision.” 18.3(h)(i) No Further Instructions. 21.2 The Arbiter Is: Construction Industry Arbitration Commission 29.1 No Day Works Are Applicable To The Contract. 31.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within 15days Of Delivery Of The Letter Of Acceptance. 31.3 The Period Between Program Of Work Updates Is 15days. The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is P 1,000.00. 34.3 The Funding Source Is Coming From Nia 39.1 The Amount Of The Advance Payment Is 15% Of The Contract Price (lump Sum) And Shall Be Release Once Upon Presentation Of The Following Documents As Required: 1. Letter Request For Advance Payment From The Contractor 2. Bank Guarantee For Advance Payment 40.1 Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Be Included For Payment. 51.1 The Date By Which Operating And Maintenance Manuals Are Required Is Not Applicable. The Date By Which “as Built” Drawings Are Required Is 20 Days Upon Completion Of The Subproject. 51.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is P1,000.00. Section Vi. Specifications Project Name: Construction Of Siljagon Multi-purpose Gym Phase 2 Location : Brgy. Siljagon, Mapanas, Northern Samar Item No. Description Qty. Unit. B.5 Project Billboard/signboard Labor A.1 A. Construction Foreman 1 4.00 B. Skilled Laborer 1 4.00 C. Unskilled Laborer 2 4.00 Materials A. Tarpaulin (8’x8”) 1.00 Pc A.2 B. Coco Lumber 84.00 Bd.ft C. Plywood Marine (o0.0125m X 1.2m 2.44m) 2.00 Pc D. Assorted Common Wire Nail 0.05 Kg B.7(2) Occupational Safety And Health Program Labor A.1 A. Safety Practirioner/officer (part Time) 1 8.00 B. Health Personnel (full Time) 1 30.00 Equipment A. Safety Shoes 24.00 Man-day B.1 B. Safety Helmet 24.00 Man-day C. Safety/working Gloves 24.00 Man-day D. Safety Vest 24.00 Man-day E. Rubber Boots 23.00 Man-day F. Rain Coats (30% Of The Duration) Optional 8.00 Man-day B.9 Mobilization/demobilization Equipment B.1 A. Dump Truck (12 Cu.yd) 2 16.00 B. Payloader (1.5 Cu.m), Lx80-2c 1 16.00 C. Bulldozer, D6h Series Ii Psd/dd 1 16.00 D. Backhoe W/ Breaker (0.80 Cu.m 1 16.00 101(3)a.2 Removal Of Existing Pcc Pavement, 0.2m Thk, Pccp (reblocking Of Intermittent Section Labor A.1 A. Construction Foreman 1.00 1 B. Unskilled Laborer 1.00 2 Equipment A. Backhoe With Breaker (0.80 Cu.m) 1.00 1 B.1 B. Payloader (1.50), Lx80 – 2c 1.00 1 C. Dump Truck (12 Cu Yd) 0.50 1 D. Concrete Saw (7.5 Hp), 14” Blade Dia 0.50 1 Minor Tools (10% Of Labor Cost) Materials F.1 A. Concrete Saw (diamond Blade 14” Dia) 0.00015 Pc 102(2)b Surplus Common Excavation Labor A.1 A. Construction Foreman 1.00 1 B. Unskilled Laborer 1.00 2 Equipment A. Bulldozer, D6h Series Ii Psd/dd 1.00 1 B.1 B. Payloader (1.5 Cu.m) 1.00 1 C. Payloader (1.5 Cu.m) 0.30 1 D. Dump Truck, (12 Cy. Yd) 1.00 3 E. Backhoe (0.80 Cu.m) 1.00 1 105(1) Subgrade Preparation (common Materials) Labor A.1 A. Construction Foreman 1.00 1 B. Unskilled Laborer 1.00 2 Equipment A. Motorized Road Grader, G710a 1.00 1 B.1 B. Vibratory Roller (10 M.t,) Sd100dc 1.00 1 C. Water Truck/pump (16000 L) 0.25 1 200(1) Aggregate Subbase Course A.1 A. Construction Foreman 1.00 1 B. Unskilled Laborer 1.00 2 Equipment A. Motorized Road Grader, G710a 1.00 1 B.1 B. Vibratory Roller (10 M.t,) Sd100dc 1.00 1 C. Water Truck/pump (16000 L) 0.25 1 Materials B.2 A. Aggregate Subbase Course 1.15 Cu.m (w/ 15% Shrinkage Factor) 201(1) Aggregate Base Course A.1 A. Construction Foreman 1.00 1 B. Unskilled Laborer 1.00 2 Equipment A. Motorized Road Grader, G710a 1.00 1 B.1 B. Vibratory Roller (10 M.t,) Sd100dc 1.00 1 C. Water Truck/pump (16000 L) 0.25 1 Materials B.2 A. Aggregate Subbase Course 1.15 Cu.m (w/ 15% Shrinkage Factor) 311(1)a.2 Pcc Pavement (plain) – Conventional Method, 200mm Thk A.1 A. Construction Foreman 1.00 1 B. Skilled Laborer 1.00 4 C. Skilled Labore 1.00 12 Equipment A. Transit Mixer 1.00 B.1 B. Concrete Vibrator 1.00 C. Concrete Batch Plant (30 Cu.m) 1.00 D. Payloader (1.50 Cu.m)lx80-2c 1.00 E. Concrete Screeder (5.5hp) 1.00 F. Water Truck/pump 1.00 G. Concrete Saw Blade 14’ (7.5hp) 1.00 H. Bar Cutter, Single Phase 0.10 I. Joint Sealer Machine 0.25 Minor Tools (5% Of Labor) Materials A. Reinforcing Steel Bar 0.39 Kg B. Curing Compound 0.29 Lit C. Asphalt Sealant 0.12 Lit D. Steel Form 0.46 L.m E. Sand 0.1100 Cu.m F. Gravel 0.20 Cu.m G. Portland Cement 1.90 Bag H. Concrete Saw (diamond 0.00015 Pc I. Joint Sealer Machine 0.0086 L.m Minor Tools (5% Of Labor) 0.0056 Lit Section Vii. Drawings Bill Of Quantities Item No. Scope Of Work Quantity Unit Unit Cost Total Amount Rehabilitation / Improvement Of Longcop St. Barangay E. Laodenio, Mapanas, Northern Samar Part B Other General Requirements B.5 Projects Billboard/sign Board 1.00 Each 10, 959.69 10, 959.69 B.7(2) Occupational Safety And Health Program 1.00 L.s 25, 530.73 25, 530.73 B.9 Mobilization/demobilization 1.00 L.s 11, 556.91 11, 556.91 Part C Earthworks 101(3)a.2 Removal Existing Pcc Pavement, 0.2m Thk (pcc Reblocking At Intermittent 410.00 Sq.m 238.30 97, 703.00 102(2)b Surplus Common Excavation 123.00 Cu.m 204.24 25, 121.52 105(1) Subgrade Preparation (common Materials) 492.00 Sq.m 21.14 10, 400.88 Part D Subbase And Base Course 200(1) Aggregate Subbase Course 89.30 Cu.m 1, 632.8 145, 771.53 201(1) Aggregate Base Course 98.40 Cu.m 2, 843.65 279, 815.16 Part E Surface Courses 311(1)a.2 Pcc Pavement (plain) – Conventional Method 200m, Thk 410.00 Sq.m 2, 160.51 885, 809.10 Total 1, 492,668.52 Total Cost Of All Line Item Includes Cost Of Contractor’s Profit, Taxes And Ocm. Attached Detailed Cost Estimates Section Ix. Bidding Forms Table Of Contents Bid Form 79 Form Of Contract Agreement 81 Omnibus Sworn Statement 83 Bid Form Date: Iaeb No: To: Lgu-mapanas Northern Samar Address: Mapanas Northern Samar We, The Undersigned, Declare That: We Have Examined And Have No Reservation To The Bidding Documents, Including Addenda, For The Contract Rehabilitation / Improvement , Mapanas Of Longcop St Barangay E. Laodenio Mapanas N. Samar (a) We Offer To Execute The Works For This Contract In Accordance With The Bid And Bid Data Sheet, General And Special Conditions Of Contract Accompanying This Bid; The Total Price Of Our Bid, Excluding Any Discounts Offered In Item (d) Below Is: [insert Information]; The Discounts Offered And The Methodology For Their Application Are: [insert Information]; (b) Our Bid Shall Be Valid For A Period Of 120 Days From The Date Fixed For The Bid Submission Deadline In Accordance With The Bidding Documents, And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period; (c) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract; (d) Our Firm, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Have Nationalities From The Following Eligible Countries: [insert Information]; (e) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (f) Our Firm, Its Affiliates Or Subsidiaries, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Has Not Been Declared Ineligible By The Funding Source; (g) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (h) We Understand That You Are Not Bound To Accept The Lowest Evaluated Bid Or Any Other Bid That You May Receive. Name: In The Capacity Of: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Form Of Contract Agreement This Agreement, Made This [insert Date] Day Of [insert Month], [insert Year] Between [name And Address Of Procuring Entity](hereinafter Called The “entity”) And [name And Address Of Contractor] (hereinafter Called The “contractor”). Whereas, The Entity Is Desirous That The Contractor Execute [name And Identification Number Of Contract] (hereinafter Called “the Works”) And The Entity Has Accepted The Bid For [insert The Amount In Specified Currency In Numbers And Words] By The Contractor For The Execution And Completion Of Such Works And The Remedying Of Any Defects Therein. Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents Shall Be Attached, Deemed To Form, And Be Read And Construed As Part Of This Agreement, To Wit: (a) General And Special Conditions Of Contract; (b) Drawings/plans; (c) Specifications; (d) Invitation To Apply For Eligibility And To Bid; (e) Instructions To Bidders; (f) Bid Data Sheet; (g) Addenda And/or Supplemental/bid Bulletins, If Any; (h) Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes; (i) Eligibility Requirements, Documents And/or Statements; (j) Performance Security; (k) Credit Line Issued By A Licensed Bank, If Any; (l) Notice Of Award Of Contract And The Bidder’s Conforme Thereto; (m) Other Contract Documents That May Be Required By Existing Laws And/or The Entity. 3. In Consideration Of The Payments To Be Made By The Entity To The Contractor As Hereinafter Mentioned, The Contractor Hereby Covenants With The Entity To Execute And Complete The Works And Remedy Any Defects Therein In Conformity With The Provisions Of This Contract In All Respects. 4. The Entity Hereby Covenants To Pay The Contractor In Consideration Of The Execution And Completion Of The Works And The Remedying Of Defects Wherein, The Contract Price Or Such Other Sum As May Become Payable Under The Provisions Of This Contract At The Times And In The Manner Prescribed By This Contract. In Witness Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Signed, Sealed, Delivered By The (for The Entity) Signed, Sealed, Delivered By The (for The Contractor). Binding Signature Of Procuring Entity ________________________________________________ Binding Signature Of Contractor _____________________________________________ [addendum Showing The Corrections, If Any, Made During The Bid Evaluation Should Be Attached With This Agreement] Omnibus Sworn Statement Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Represent It In The Bidding For [name Of The Project] Of The [name Of The Procuring Entity]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary And/or To Represent The [name Of Bidder] In The Bidding As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate Issued By The Corporation Or The Members Of The Joint Venture)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder]is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: I Am Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [jurat] * This Form Will Not Apply For Wb Funded Projects.
Closing Date16 Dec 2024
Tender AmountPHP 1.4 Million (USD 25.2 K)
BULACAN AGRICULTURAL STATE COLLEGE Tender
Civil And Construction...+1Construction Material
Philippines
Details: Description Bulacan Agricultural State College Early Procurement Activity For Construction Of 2-storey Agroforestry Building With Rainwater Catchment Facility November, 2024 Preface These Philippine Bidding Documents (pbds) For The Procurement Of Infrastructure Projects (hereinafter Referred To Also As The “works”) Through Competitive Bidding Have Been Prepared By The Government Of The Philippines For Use By All Branches, Agencies, Departments, Bureaus, Offices, Or Instrumentalities Of The Government, Including Government-owned And/or -controlled Corporations, Government Financial Institutions, State Universities And Colleges, Local Government Units, And Autonomous Regional Government. The Procedures And Practices Presented In This Document Have Been Developed Through Broad Experience, And Are For Mandatory Use In Projects That Are Financed In Whole Or In Part By The Government Of The Philippines Or Any Foreign Government/foreign Or International Financing Institution In Accordance With The Provisions Of The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. The Pbds Are Intended As A Model For Admeasurements (unit Prices Or Unit Rates In A Bill Of Quantities) Types Of Contract, Which Are The Most Common In Works Contracting. The Bidding Documents Shall Clearly And Adequately Define, Among Others: (i) The Objectives, Scope, And Expected Outputs And/or Results Of The Proposed Contract; (ii) The Eligibility Requirements Of Bidders; (iii) The Expected Contract Duration; And (iv) The Obligations, Duties, And/or Functions Of The Winning Bidder. Care Should Be Taken To Check The Relevance Of The Provisions Of The Pbds Against The Requirements Of The Specific Works To Be Procured. If Duplication Of A Subject Is Inevitable In Other Sections Of The Document Prepared By The Procuring Entity, Care Must Be Exercised To Avoid Contradictions Between Clauses Dealing With The Same Matter. Moreover, Each Section Is Prepared With Notes Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Shall Not Be Included In The Final Documents. The Following General Directions Should Be Observed When Using The Documents: A. All The Documents Listed In The Table Of Contents Are Normally Required For The Procurement Of Infrastructure Projects. However, They Should Be Adapted As Necessary To The Circumstances Of The Particular Project. B. Specific Details, Such As The “name Of The Procuring Entity” And “address For Bid Submission,” Should Be Furnished In The Instructions To Bidders, Bid Data Sheet, And Special Conditions Of Contract. The Final Documents Should Contain Neither Blank Spaces Nor Options. C. This Preface And The Footnotes Or Notes In Italics Included In The Invitation To Bid, Bds, General Conditions Of Contract, Special Conditions Of Contract, Specifications, Drawings, And Bill Of Quantities Are Not Part Of The Text Of The Final Document, Although They Contain Instructions That The Procuring Entity Should Strictly Follow. D. The Cover Should Be Modified As Required To Identify The Bidding Documents As To The Names Of The Project, Contract, And Procuring Entity, In Addition To Date Of Issue. E. Modifications For Specific Procurement Project Details Should Be Provided In The Special Conditions Of Contract As Amendments To The Conditions Of Contract. For Easy Completion, Whenever Reference Has To Be Made To Specific Clauses In The Bid Data Sheet Or Special Conditions Of Contract, These Terms Shall Be Printed In Bold Typeface On Sections I (instructions To Bidders) And Iii (general Conditions Of Contract), Respectively. F. For Guidelines On The Use Of Bidding Forms And The Procurement Of Foreign-assisted Projects, These Will Be Covered By A Separate Issuance Of The Government Procurement Policy Board. Table Of Contents Glossary Of Terms, Abbreviations, And Acronyms 5 Section I. Invitation To Bid 8 Section Ii. Instructions To Bidders 11 1. Scope Of Bid 12 2. Funding Information 12 3. Bidding Requirements 12 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices 12 5. Eligible Bidders 13 6. Origin Of Associated Goods 13 7. Subcontracts 13 8. Pre-bid Conference 13 9. Clarification And Amendment Of Bidding Documents 13 10. Documents Comprising The Bid: Eligibility And Technical Components 14 11. Documents Comprising The Bid: Financial Component 14 12. Alternative Bids 14 13. Bid Prices 15 14. Bid And Payment Currencies 15 15. Bid Security 15 16. Sealing And Marking Of Bids 15 17. Deadline For Submission Of Bids 16 18. Opening And Preliminary Examination Of Bids 16 19. Detailed Evaluation And Comparison Of Bids 16 20. Post Qualification 16 21. Signing Of The Contract 16 Section Iii. Bid Data Sheet 17 Section Iv. General Conditions Of Contract 20 1. Scope Of Contract 21 2. Sectional Completion Of Works 21 3. Possession Of Site 21 4. The Contractor’s Obligations 21 5. Performance Security 22 6. Site Investigation Reports 22 7. Warranty 22 8. Liability Of The Contractor 22 9. Termination For Other Causes 22 10. Dayworks 23 11. Program Of Work 23 12. Instructions, Inspections And Audits 23 13. Advance Payment 23 14. Progress Payments 23 15. Operating And Maintenance Manuals 24 Section V. Special Conditions Of Contract 25 Section Vi. Specifications 27 Section Vii. Drawings 37 Section Viii. Bill Of Quantities 58 Section Ix. Checklist Of Technical And Financial Documents 67 Glossary Of Terms, Abbreviations, And Acronyms Abc – Approved Budget For The Contract. Arcc – Allowable Range Of Contract Cost. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Cda – Cooperative Development Authority. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Contractor – Is A Natural Or Juridical Entity Whose Proposal Was Accepted By The Procuring Entity And To Whom The Contract To Execute The Work Was Awarded. Contractor As Used In These Bidding Documents May Likewise Refer To A Supplier, Distributor, Manufacturer, Or Consultant. Cpi – Consumer Price Index. Dole – Department Of Labor And Employment. Dti – Department Of Trade And Industry. Foreign-funded Procurement Or Foreign-assisted Project – Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Pcab – Philippine Contractors Accreditation Board. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Un – United Nations. Section I. Invitation To Bid Notes On The Invitation To Bid The Invitation To Bid (ib) Provides Information That Enables Potential Bidders To Decide Whether To Participate In The Procurement At Hand. The Ib Shall Be Posted In Accordance With Section 21.2 Of The 2016 Revised Irr Of Ra No. 9184. Apart From The Essential Items Listed In The Bidding Documents, The Ib Should Also Indicate The Following: A. The Date Of Availability Of The Bidding Documents, Which Shall Be From The Time The Ib Is First Advertised/posted Until The Deadline For The Submission And Receipt Of Bids; B. The Place Where The Bidding Documents May Be Acquired Or The Website Where It May Be Downloaded; C. The Deadline For The Submission And Receipt Of Bids; And D. Any Important Bid Evaluation Criteria. The Ib Should Be Incorporated Into The Bidding Documents. The Information Contained In The Ib Must Conform To The Bidding Documents And In Particular To The Relevant Information In The Bid Data Sheet. Bulacan Agricultural State College San Ildefonso, Bulacan, 3010 Invitation To Bid For Early Procurement Activity Construction Of 2-storey Agroforestry Building With Water Catchment Facility] 1. The Bulacan Agricultural State College, Through The General Appropriations Act Of 2025 (gaa) Under The Capital Outlay For The Fy 2025 Intends To Apply The Sum Of Twenty Five Million Pesos (php 25,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For 2024-01-infra: Construction Of 2-storey Agroforestry Building With Water Catchment Facility. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bulacan Agricultural State College Now Invites Bids For The Above Procurement Project. Completion Of The Works Is Required On Or Before The Two Hundred Seventy (270) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information From Bulacan Agricultural State College And Inspect The Bidding Documents At The Address Given Below From From 8:30 Am To 4:30 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 9, 2024 To December 2, 2024 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Twenty Five Thousand Pesos (php 25,000.00). Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Presenting The Receipt Upon Submission Of Their Bid Documents. 6. The Bulacan Agricultural State College Will Hold A Pre-bid Conference On November 18, 2024, 09:00 Am Via Zoom Platform (meeting Id: 828 5597 7530; Passcode: 662401) Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before 08:30 Am Of December 2, 2024. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On December 2, 2024, 9:00am At The The Conference Room, Ground Floor, Farmers Training Center, Basc, San Ildefonso, Bulacan. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. Observers Will Be Invited To Attend And Witness The Bid Proceedings. 11. The Bulacan Agricultural State College Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Rona Angela O. Clarin Bac Secretariat Head Bulacan Agricultural State College Brgy. Pinaod, San Ildefonso, Bulacan (044) 697-1240 And 0923-108-1526 Ronaangela_clarin@basc.edu.ph Www.basc.edu.ph 13. You May Visit The Following Websites: Www.basc.edu.ph November 9, 2024 Ronald Reagan T. Alonzo,ph.d. Bac Chairperson Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, Bulacan Agricultural State College Invites Bids For The Proposed Construction Of 2-storey Agroforestry Building With Water Catchment Facility, With Project Identification Number 2024-01-infra. The Procurement Project (proposed Construction Of 2-storey Agroforestry Building With Water Catchment Facility) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For Gaa Fy 2025 In The Amount Of Php25,000,000.00 2.2. The Source Of Funding Is: A. Nga, The National Expenditure Program. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time Via Online Platform As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until 120 Days From The Opening Of Bids. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The Original Of The First And Second Components Of Its Bid And Plus Two (2) Copies Of Each Kind, Labeled As Copy 1 And Copy 2. Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Notes On The Bid Data Sheet (bds) The Bid Data Sheet (bds) Consists Of Provisions That Supplement, Amend, Or Specify In Detail, Information, Or Requirements Included In The Itb Found In Section Ii, Which Are Specific To Each Procurement. This Section Is Intended To Assist The Procuring Entity In Providing The Specific Information In Relation To Corresponding Clauses In The Itb And Has To Be Prepared For Each Specific Procurement. The Procuring Entity Should Specify In The Bds Information And Requirements Specific To The Circumstances Of The Procuring Entity, The Processing Of The Procurement, And The Bid Evaluation Criteria That Will Apply To The Bids. In Preparing The Bds, The Following Aspects Should Be Checked: A. Information That Specifies And Complements Provisions Of The Itb Must Be Incorporated. B. Amendments And/or Supplements, If Any, To Provisions Of The Itb As Necessitated By The Circumstances Of The Specific Procurement, Must Also Be Incorporated. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Construction, Renovation, Rehabilitation, Repair Of School, Laboratory And Office Buildings. 7.1 Subcontracting Is Not Allowed. 10.3 Appropriate Pcab License Commensurate To The Project. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel General Experience Relevant Experience Civil Engineer/ Architect At Least 5 Years At Least 5 Years Materials Engineer At Least 5 Years At Least 5 Years Foreman At Least 5 Years At Least 5 Years Safety Officer At Least 5 Years At Least 5 Years Skilled Laborer At Least 3 Years At Least 3 Years Laborer - - 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units Mini Dump Truck Or Elf Truck 1 Concrete Mixer One Bagger 2 Cut Off/ Bar Cutter - 2 Bar Bender - 2 Concrete Vibrator - 2 Welding Machine Heavy Duty 2 12 Alternative Bids Are Not Allowed. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than Php500,000.0 [two Percent (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less Than P1,250,000.00 [ Five Percent (5%) Of Abc] If Bid Security Is In Surety Bond. 19.2 Partial Bids Are Not Allowed. 20 Building Permit, Occupancy Permit, Locational Clearance, Environmental Compliance Certificate, Certification That The Project Site Is Not Within A Geohazard Zone.etc. 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And (pert/cpm) Or Other Acceptable Tools Of Project Scheduling. Section Iv. General Conditions Of Contract Notes On The General Conditions Of Contract The General Conditions Of Contract (gcc) In This Section, Read In Conjunction With The Special Conditions Of Contract In Section V And Other Documents Listed Therein, Should Be A Complete Document Expressing All The Rights And Obligations Of The Parties. Matters Governing Performance Of The Contractor, Payments Under The Contract, Or Matters Affecting The Risks, Rights, And Obligations Of The Parties Under The Contract Are Included In The Gcc And Special Conditions Of Contract. Any Complementary Information, Which May Be Needed, Shall Be Introduced Only Through The Special Conditions Of Contract. 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 4.1. The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 4.2. If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Notes On The Special Conditions Of Contract Similar To The Bds, The Clauses In This Section Are Intended To Assist The Procuring Entity In Providing Contract-specific Information In Relation To Corresponding Clauses In The Gcc Found In Section Iv. The Special Conditions Of Contract (scc) Complement The Gcc, Specifying Contractual Requirements Linked To The Special Circumstances Of The Procuring Entity, The Procuring Entity’s Country, The Sector, And The Works Procured. In Preparing This Section, The Following Aspects Should Be Checked: A. Information That Complements Provisions Of The Gcc Must Be Incorporated. B. Amendments And/or Supplements To Provisions Of The Gcc As Necessitated By The Circumstances Of The Specific Purchase, Must Also Be Incorporated. However, No Special Condition Which Defeats Or Negates The General Intent And Purpose Of The Provisions Of The Gcc Should Be Incorporated Herein. Special Conditions Of Contract Gcc Clause 2 The Intended Completion Date Of Construction Of 2-storey Agroforestry Building With Rainwater Catchment Facility Is Two Hundred Seventy (270) Calendar Days From The Date Of The Receipt Of Notice To Proceed. 4.1 The Schedule Of Delivery Of The Possession Of The Site To The Contractor Is Upon The Receipt Of The Notice To Proceed. 6 The Site Investigation Reports Are: 7.2 In Case Of Permanent Structures, Such As Buildings Of Types 4 And 5 As Classified Under The National Building Code Of The Philippines And Other Structures Made Of Steel, Iron, Or Concrete Which Comply With Relevant Structural Codes (e.g., Dpwh Standard Specifications), Such As, But Not Limited To, Steel/concrete Bridges, Flyovers, Aircraft Movement Areas, Ports, Dams, Tunnels, Filtration And Treatment Plants, Sewerage Systems, Power Plants, Transmission And Communication Towers, Railway System, And Other Similar Permanent Structures:] Fifteen (15) Years. 10 A. Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within 7 Calendar Days Of Delivery Of The Notice Of Award. 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is 1% Of The Progress Billing. 13 The Amount Of The Advance Payment Is Fifteen Percent (15%) Of The Contract Price To Be Paid Upon Written Request Of The Contractor Reconciling On The Date Of The Notice To Proceed And Upon Submission Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, And Bank Guarantee Or A Surety Bond Callable Upon Demand, Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission. 14 Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15.1 The Date By Which “as Built” Drawings Are Required Is Fifteen (15) Calendar Days From Completion Of Project. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is 0.1% Of The Final Contract Amount. Section Vi. Specifications Notes On Specifications A Set Of Precise And Clear Specifications Is A Prerequisite For Bidders To Respond Realistically And Competitively To The Requirements Of The Procuring Entity Without Qualifying Or Conditioning Their Bids. In The Context Of International Competitive Bidding, The Specifications Must Be Drafted To Permit The Widest Possible Competition And, At The Same Time, Present A Clear Statement Of The Required Standards Of Workmanship, Materials, And Performance Of The Goods And Services To Be Procured. Only If This Is Done Will The Objectives Of Economy, Efficiency, And Fairness In Procurement Be Realized, Responsiveness Of Bids Be Ensured, And The Subsequent Task Of Bid Evaluation Facilitated. The Specifications Should Require That All Goods And Materials To Be Incorporated In The Works Be New, Unused, Of The Most Recent Or Current Models, And Incorporate All Recent Improvements In Design And Materials Unless Provided Otherwise In The Contract. Samples Of Specifications From Previous Similar Projects Are Useful In This Respect. The Use Of Metric Units Is Mandatory. Most Specifications Are Normally Written Specially By The Procuring Entity Or Its Representative To Suit The Works At Hand. There Is No Standard Set Of Specifications For Universal Application In All Sectors In All Regions, But There Are Established Principles And Practices, Which Are Reflected In These Pbds. There Are Considerable Advantages In Standardizing General Specifications For Repetitive Works In Recognized Public Sectors, Such As Highways, Ports, Railways, Urban Housing, Irrigation, And Water Supply, In The Same Country Or Region Where Similar Conditions Prevail. The General Specifications Should Cover All Classes Of Workmanship, Materials, And Equipment Commonly Involved In Construction, Although Not Necessarily To Be Used In A Particular Works Contract. Deletions Or Addenda Should Then Adapt The General Specifications To The Particular Works. Care Must Be Taken In Drafting Specifications To Ensure That They Are Not Restrictive. In The Specification Of Standards For Goods, Materials, And Workmanship, Recognized International Standards Should Be Used As Much As Possible. Where Other Particular Standards Are Used, Whether National Standards Or Other Standards, The Specifications Should State That Goods, Materials, And Workmanship That Meet Other Authoritative Standards, And Which Ensure Substantially Equal Or Higher Quality Than The Standards Mentioned, Will Also Be Acceptable. The Following Clause May Be Inserted In The Scc. Sample Clause: Equivalency Of Standards And Codes Wherever Reference Is Made In The Contract To Specific Standards And Codes To Be Met By The Goods And Materials To Be Furnished, And Work Performed Or Tested, The Provisions Of The Latest Current Edition Or Revision Of The Relevant Standards And Codes In Effect Shall Apply, Unless Otherwise Expressly Stated In The Contract. Where Such Standards And Codes Are National, Or Relate To A Particular Country Or Region, Other Authoritative Standards That Ensure A Substantially Equal Or Higher Quality Than The Standards And Codes Specified Will Be Accepted Subject To The Procuring Entity’s Representative’s Prior Review And Written Consent. Differences Between The Standards Specified And The Proposed Alternative Standards Shall Be Fully Described In Writing By The Contractor And Submitted To The Procuring Entity’s Representative At Least Twenty-eight (28) Days Prior To The Date When The Contractor Desires The Procuring Entity’s Representative’s Consent. In The Event The Procuring Entity’s Representative Determines That Such Proposed Deviations Do Not Ensure Substantially Equal Or Higher Quality, The Contractor Shall Comply With The Standards Specified In The Documents. These Notes Are Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Should Not Be Included In The Final Bidding Documents. Proposed Construction Of 2-storey Agroforestry Building With Rainwater Catchment Facility Basc Drt Campus Technical Specifications Bulacan Agricultural State College Pinaod, San Ildefonso, Bulacan November 2024 Specifications 1. General Requirements 1.1 These Specifications Are Intended To Cover All Labor And Materials Required For The Complete Construction Of The Proposed Projects As Shown In The Working Drawings As Described Herein. 1.2 Materials And/ Or Work Not Specifically Mentioned In The Specifications, Working Drawings, And Other Contract Documents But Is Implied And Deemed Necessary To Complete The Work Shall Be Supplied By The Contractor And Executed In A Workman-like Manner, Of Appropriate Number, Location, And Size Of The Highest Quality Available Without Extra Cost To The Owner. 1.3 The Owner Reserves The Right To Alter And/or Omit Any Part Of The Plans With The Approval Of The Architect Or Engineer As The Case May Be. Any Extra Charge Must Be Situated To The Architect And/or Project Manager For Approval Before Final Acceptance. 1.4 The Contractor Shall Secure All Permits And Licenses As Required And Also Shall Be Responsable For All The Liabilities, Under Workmen’s Compensation, Sss, Insurance, Etc. 1.5 The Contractor Shall Furnish For Approval Of The Architect/engineer, With Promptness, Samples As Specified Or Required. Works Shall Be In Accordance With The Approved Samples. 1.6 The Contractor Shall Guarantee The Words, Except For Those With Specific Guarantee For A Period Of One (1) Year After Final Acceptance By The Owner. He Shall Repair,replace And Make Good At His Expenses Any And All Defects, Which May Arise During That Term Of Guarantee And Warranty Due To Defective Workmanship And/or Interior Quality Of Materials. 2. Methods Of Construction 2.1 The Construction Shall Be Done In The Manner That Would Cause Least Disturbance To Neighborhood And Occupant Of The Area. The Contractor Will Be Allowed To Work 24 Hours If Necessary To Complete The Work On Time Subject To Approval Of The Owner. 2.2 All Works To Be Done Shall Be Of The Best Quality And Workmanship. 3. Masonry 3.1 Exterior Wall Should Be Chb 5 Inches Wall Bearing With 10 Mm Diameter Reinforcement Bars Spaced @ 0.80 Meter For Vertical And For Every 3 Layers Of Chb For Horizontal Bars. 3.2 Partition Wall Should Be Chb 4 Inches With 10 Mm Diameter Reinforcement Bars Spaced @ 0.80 Meter For Vertical And For Every 3 Layers Of Chb For Horizontal Bars In Rooms,hallway,and Toilet. 3.3 Low Partition Should Be Chb 4 Inches 1.80 Meters High With 10 Mm Diameter Reinforcement Bars Spaced @ 0.80 Meters For Vertical And For Every 3 Layer Of Chb For Horizontal Bars In Toilet Partition/cubicles. 4. Wall Finishes 4.1. Interior Walls Finishes Should Be Smooth Plain Cement Plaster; Concrete Neutralizer Treatment; Patching; Paint Finish (boysen Paint Or Approved Equal) W/ 4” Base Board. Note: Patchwork Should Be Followed With One Coat Of Concrete Primer As Primer-surfacer To Reduce Unsightly Uneven Appearance After Topcoat Application. 4.2. Exterior Wall Finishes Should Be Smooth Plain Cement Plaster; Concrete Neutralizer Treatment; Patching; 2 Coat Paint Finish (boysen Paint Or Approved Equal). 4.3. Provide 40 Cm X 40 Cm Glazed Wall Tiles (eurotiles Or Approved Equal) From Finish Floor Line To 1.80 Meter High, For All Toilet And Cubicles 4.4. Provide 40 Cm X 40 Cm Glazed Wall Tiles (eurotiles Or Approved Equal) For Splashboards For Lavatories In Laboratory/ Kitchen. 4.5. Provide 2” Thick Simulated Stone Cladding (asi, Stone Age Or Approved Equal), See Plans And Drawings. 5. Ceiling Finishes 5.1. All Interior Ceiling - 6 Mm Thick Fiber Cement Hardiflex Ceiling Board Riveted On Metal Furring Channels Providing A V-cut In Every Joint; Prevent Rivet Head To Exposed In Ceiling Surface; Patching All Rivets And Joints W/ Skim Coat; 2 Coat Paint Finish Flat Latex Paint (boysen Or Approved Equal). 5.2. Outside Ceiling – 8” X L X 0.4 Mm Thick Spandrel (union Brand Or Approved Equal). 5.3. Provide Eaves Hole For Ventilation (see Plans And Drawings) 5.4. Provide 4” Ceiling Drop If Necessary (see Plans And Drawings). 6. Carpentry Works 6.1. Cabinets Beneath The Lavatory/ Kitchen Counters In 2” X 3” Kd Treated Wood Frame; ¾” Mdf Membrane Press Doors W/ Liston; Paint Finish. 6.2. Provide Concealed Hinges And Handle For Cabinet Doors. 6.3. All Door Jamb Should Be 2’ X 6” Steel, Paint Finish. 7. Doors/hardwares 7.1. 1.0 M X 2.1 M X 41 Mm Thick Kiln Dry Solid Panel-type Door W/ Simulated Wood Grain Including 50 Mm X 150 Mm Solid Door Jamb W/ Simulated Wood Grain; Varnish Finish. For Classrooms (see Plans And Drawings). 7.2. 0.9 M X 1.2 M Flush Door W/ Jamb, For Common And Pwd Cr; Varnish Finish 7.3. 0.6 M X 1.60 M Aluminum (analok) Door W/ Handle, Hinges And Locksets For Cubicle In Toilets. 7.4. 0.8m X 2.1 M X 41 Mm Thick Kiln Dry Solid Panel-type Door W/ Simulated Wood Grain Including 50 Mm X 150 Mm Solid Door Jamb W/ Simulated Wood Grain; For Stockroom/electrical Room/beneath The Stairs; Varnish Finish. 7.5. Provide 1 Set Of Door Knob (yale Or Approved Equal) And 4 Pcs Of 3-1/2” Hinges (loose Pin Stanley Or Approved Equal) Each Panel-type Door. 8. Windows 8.1. 2.4 M X 1.2 M And 1.2 M X 1.2m Sliding Window 0.90m From Finísh Floor Line For Classrooms (see Plans And Drawings) 8.2. 0.5 M X 0.5 M And 0.6 M X 1.2 M Aluminum And Glass Awning Window Elevated 1.80m & 1.55m From Finísh Floor Line For Toilets. (see Plans And Drawings) 8.2. 1.2 M X 1.8 M Aluminum And Glass Awning & Fixed Type Window Elevated 0.35m From Finísh Floor Line For Ramps. (see Plans And Drawings) 8.3. All Windows Shall Have Grills Made Of 1” X 1” X 1.2 Mm Thick Galvanize Iron Square Tube Welded Except For Ramp Windows (see Plans And Drawings); Quick Drying Enamel Paint Finish. 8.4. All Aluminum Frames Shall Be Of The Best Quality, Analok Finish Free From Internal Defects. 8.5. All Glass Shall Be ¼” Thick Brown In Color, Unless Specify On Plan. 9. Tile Works 9.1. 60 Cm X 60 Cm Non-skid Tiles, Eurotiles Or Approved Equal, For Flooring At All Floors And 60 Cm X 60 Cm Unglazed For Hallways (submit Sample For Approval). 9.2. 30 Cm X 30 Cm Unglazed Tiles, Eurotiles Or Approved Equal For Landing,thread,and Riser In All Stairs. (submit Sample For Approval). 9.3. 30 Cm X 30 Cm Unglazed Tiles, Eurotiles Or Approved Equal, For Walls Of Toilets And Cubicles. (submit Sample For Approval). 9.4. 60 Cm X 60 Cm Doublé Polish Glazed Tiles, Eurotiles Or Approved Equal For Countertops For Sink And Lavatories. (submit Sample For Approval). 9.5. Provide Tile Grout For Tile Joints. 9.6. Provide 2 Coats Of Wáter Proofing Before Laying Of Floor Tiles In All Toilets In The Second Floor-fourth Floor. 10. Sanitary Work/ Fittings & Fixtures 10.1. Fittings & Fixtures 10.1.1. Wáter Closet - Closed-coupled Wáter Closet Dual Flush By Pozzi Or Approved Equal W/ Complete Fittings And Accessories. (submit Sample For Approval). 10.1.2. Lavatory - Basin-type Counter Lavatory By Pozzi Or Approved Equal W/ Complete Fittings And Accessories. (submit Sample For Approval). 10.1.3. Lavatory Faucet - Basin Mixer W/ Complete Accessories By Hcg Or Approved Equal And Hose Bibb For Every Wáter Closet. (submit Sample For Approval). 10.1.4. Urinal - Wash Down/ Gravity-flushing By Hcg Or Approved Equal W/ Complete Fittings And Accessories. (submit Sample For Approval) 10.1.5. Soap Holder – By Pozzi Or Approved Equal. 10.1.6. Tissue Holder – By Pozzi Or Approved Equal. 10.1.7. Floor Drain – 4” X 4” Stainless Steel Floor Drain. 10.2. 25 Mm And 20 Mm Polypropylene Random (ppr) Pipes And Ppr Fittings For Wáter Supply Lines/ Cold Wáter Lines. (as Per Plan). 10.3. 100mm (4”) And 50 Mm (2”) Diameter Unplasticized Polyvinyl Chloride (upvc) Sanitary Pipes And Fittings (neltex Orange Series 1000). (as Per Plan). 10.4. One (1) Septic Tank (as Per Plan) 10.5. Drainage System And Catch Basins (as Per Plan) 10.6. Provide P-trap To All Floor Drains And Sink. 11. Painting Works Materials Brand – Boysen Or Approved Equal. 11.1. For Interior/exterior Concrete Plaster: Pre-treatment : Concrete Neutralizer. Test With Litmus Or Ph Paper First Coat : Water-based Epoxy Primer (for Badly Weathered Concrete Or When Long Lasting Durability Is Desired) Patchwork : Patch-eeze Patching Compound. Note: Patchwork Should Be Followed With One Coat Of Concrete Primer As Primer-surfacer To Reduce Unsightly Uneven Appearance After Topcoat Application. Second Coat : Two (2) Coats Of Semi-gloss Latex. 12.2. For Interior Ceilings: First Coat : Interior Primer And Sealer Patchwork : Skim Coat Second Coat : Two (2) Coats Of Flat Latex 12.3. For Interior Woodworks And Doors: First Coat : Wood Putty Second Coat : Two (2) Coats Of Quick Drying Enamel. 12. Electrical Works 12.1. Wires / Conductors 12.1.1. Power Line - Insulated Copper Wire For 600v Level, Thw For Main Feeder And Tw For Load Side, Sycwin, Philflex Or Approved Equal. 12.2. Conduits 12.2.1. Service Entrance – Rigid Steel Consduit (rsc), Galvanized Iron Schedule 40. 12.2.2. Internal & Embedded – Pvc Pipes By Powerguard Or Approved Equal 12.3. Fixtures & Devices 12.3.1. Utility Box – 2” X 4” Poly Or Approved Equal. 12.3.2. Junction Box – 4” X 4” W/ Cover Poly Or Approved Equal. 12.3.3. Switches – 2” X 4” Switch Set By Panasonic Or Approved Equal (1 Gang/2 Gang/3 Gang) See Plans And Drawings. 12.3.4. Outlets – 2” X 4” Dúplex Convenience Outlet Set By Panasonic Or Approved Equal. 12.3.5. Panel Board – Ga. # 16 Metal Enclosure With Copper Bus Bar, Dead Front, Flush Mounted, Nema Brand Or Approved Equal. 12.3.6. Circuit Breaker – Molded Case Polyester Resin, Bolt Ton Type Thermal Magnetic Type, Common Internal Trip, 250v Ac, 10kaic Mínimum, General Electric Or Approved Equal (ampere Rating As Specified On Plans). 12.3.7. Grounding System – 16 Mm Dia. X 3000mm Hot Dipped Galvanized Steel Ground Rod. 12.4. Lighting Fixtures 12.4.1. Louver 4x20 With 20 Watts Luminaire Led T8 Light W/ Aluminum Reflector (surface Type). 15.4.2. 6” Dia. Receptacle W/ 16 Watts Led Bulb Firefly Or Approved Equal. 13. Concrete Works 14.1. Class A Mixture (1 Part Portland Cement, 2 Part Sand, And 4 Part Gravel) For Slabs In 2nd Floor And Landings, Stairs, Columns, Beams, Lintel Beams, Tie Beams, Column Footings, Wall Footings, Canopy And Septic Tank. 14.2. Class B Mixture (1 Part Portland Cement, 2-1/2 Part Sand, And 5 Part Gravel) For Slabs In Ground Floor And All Other Concrete Not Mention In 14.1. 14.3. Cement Plaster Must Be 1 Part Portland Cement, And 3 Part Sand. 14. Miscellaneous 14.1. Provide ¼” Thick X 4 Ft. High Mirror Glass For Wall Of All Toilets Covering The Entire Length Of Countertops Of Lavatory. 14.2. Provide Peebles Stone Or Waffle Tiles For All Ramp-up And Exterior Steps/stairs Covering The Thread And Riser. 14.3. Stairs And Pwd Ramp-up - Provide 2” Ø X 1.5 Mm Thick Stainless Tube (mirror Type Sus 304) For Stairs Handrail And Main Post; 1-1/2” Ø X 1.5 Mm Thick Stainless Tube For Vertical Members; 1” Ø X 1.5 Mm Thick Stainless Tube For Horizontal Members. Buffing Finish. 14.4. Corridor Railing – Provide 2” Ø Pipe For Handrail; All Joints Must Be Welded Together. Paint Finish. 14.5. Provide 4 Ceiling Fan 16” (asahi Or Approved Equal) Each Classroom. 14.6. Provide 2 Sets Of 4’ X 8’ White Board W/ Aluminum Frame Each Classroom. 14.7. Provide 35 Sets Of Arm Chair (monoblock) Each Classroom. 14.8. Provide Teacher’s Table & Chair Each Classroom. 14.9. Provide Fire Extinguisher 10lbs For Each Classroom. 14.10. Provide Emergency Light For Each Classroom. 14.11. Provide Emergency Fire Alarm For Every Floor. 14.12. Provide Exhaust Fan 12” At Each Toilet. Provide Also Manhole Cover At Each Toilet And Storage Room On Both Floors. 14.13. Provide 4-ibc (intermediate Bulk Container) Tanks For Rainwater Catchment (1000 L Capacity Each), 2- Elevated Wáter Tank (1000 L Capacity Each) (install Horizontal) With Booster Pump 1.5hp. 14.14. Provide Also Pvc Accordion Type Partition At 2ndfloor. 14.15. Provide 10mm Roof Insulation Double-sided At Roofing. 14.16. Provide (2) Sets Of Split Type Airconditioning Unit 2hp – Supply And Install Section Vii. Drawings Section Viii. Bill Of Quantities Notes On The Bill Of Quantities Objectives The Objectives Of The Bill Of Quantities Are: A. To Provide Sufficient Information On The Quantities Of Works To Be Performed To Enable Bids To Be Prepared Efficiently And Accurately; And B. When A Contract Has Been Entered Into, To Provide A Priced Bill Of Quantities For Use In The Periodic Valuation Of Works Executed. In Order To Attain These Objectives, Works Should Be Itemized In The Bill Of Quantities In Sufficient Detail To Distinguish Between The Different Classes Of Works, Or Between Works Of The Same Nature Carried Out In Different Locations Or In Other Circumstances Which May Give Rise To Different Considerations Of Cost. Consistent With These Requirements, The Layout And Content Of The Bill Of Quantities Should Be As Simple And Brief As Possible. Daywork Schedule A Daywork Schedule Should Be Included Only If The Probability Of Unforeseen Work, Outside The Items Included In The Bill Of Quantities, Is High. To Facilitate Checking By The Entity Of The Realism Of Rates Quoted By The Bidders, The Daywork Schedule Should Normally Comprise The Following: A. A List Of The Various Classes Of Labor, Materials, And Constructional Plant For Which Basic Daywork Rates Or Prices Are To Be Inserted By The Bidder, Together With A Statement Of The Conditions Under Which The Contractor Will Be Paid For Work Executed On A Daywork Basis. B. Nominal Quantities For Each Item Of Daywork, To Be Priced By Each Bidder At Daywork Rates As Bid. The Rate To Be Entered By The Bidder Against Each Basic Daywork Item Should Include The Contractor’s Profit, Overheads, Supervision, And Other Charges. Provisional Sums A General Provision For Physical Contingencies (quantity Overruns) May Be Made By Including A Provisional Sum In The Summary Bill Of Quantities. Similarly, A Contingency Allowance For Possible Price Increases Should Be Provided As A Provisional Sum In The Summary Bill Of Quantities. The Inclusion Of Such Provisional Sums Often Facilitates Budgetary Approval By Avoiding The Need To Request Periodic Supplementary Approvals As The Future Need Arises. Where Such Provisional Sums Or Contingency Allowances Are Used, The Scc Should State The Manner In Which They Will Be Used, And Under Whose Authority (usually The Procuring Entity’s Representative’s). The Estimated Cost Of Specialized Work To Be Carried Out, Or Of Special Goods To Be Supplied, By Other Contractors Should Be Indicated In The Relevant Part Of The Bill Of Quantities As A Particular Provisional Sum With An Appropriate Brief Description. A Separate Procurement Procedure Is Normally Carried Out By The Procuring Entity To Select Such Specialized Contractors. To Provide An Element Of Competition Among The Bidders In Respect Of Any Facilities, Amenities, Attendance, Etc., To Be Provided By The Successful Bidder As Prime Contractor For The Use And Convenience Of The Specialist Contractors, Each Related Provisional Sum Should Be Followed By An Item In The Bill Of Quantities Inviting The Bidder To Quote A Sum For Such Amenities, Facilities, Attendance, Etc. Signature Box A Signature Box Shall Be Added At The Bottom Of Each Page Of The Bill Of Quantities Where The Authorized Representative Of The Bidder Shall Affix His Signature. Failure Of The Authorized Representative To Sign Each And Every Page Of The Bill Of Quantities Shall Be A Cause For Rejection Of His Bid. These Notes For Preparing A Bill Of Quantities Are Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Should Not Be Included In The Final Documents. Bill Of Quantities Item Description Unit Qty Unit Cost Amount I. Design And Permit A. Detailed Engineering And Architectural Design Lot 1.00 250,000.00 250,000.00 B. Permits, Insurance And Bonds Lot 1.00 Ii. General Requirements A. Mobilization/demobilization Lot 1.00 B. Temporary Facilities Lot 1.00 C. Safety And Health Requirements Lot 1.00 Ii. Earth Works A. Staking And Layout Lot 1.00 B. Excavation Works Cu.m 242.43 C. Backfilling Works Cu.m 170.90 D. Gravel Bedding Cu.m 35.75 E. Soil Poisoning Lot 1.00 F. Disposal And Hauling Of Materials Lot 1.00 Iii. Structural/civil Works A. Concrete Works Structural Concrete Cu.m 369.38 Reinforcing Steel Including Ties Kgs 38,213.68 Formworks And Scaffoldings Sq.m 2,755.79 B. Roof Framing Works Lot 1.00 Iv. Architectural Works A. Masonry Works Sq.m 1,820.07 B. Ceiling Works Sq.m 650.00 C. Floor Finishes Sq.m 1,073.16 D. Wall Finishes Sq.m 1,820.07 E. Doors And Windows 1000x2100 Solid Wood (tanguile) Panel Door With 50x150mm Steel Jamb; Complete With Hardware And Accessories Keyed Entry Door Knob; Varnish Finish Sets 16.00 900x2100 Solid Wood (tanguile) Panel Door With Stainless Steel Kick Plate On 50x150mm Steel Jamb; Complete With Hardware And Accessories Keyed Entry Door Knob; Varnish Finish Sets 2.00 900x2100 Solid Wood (tanguile) Panel Door With 50x150mm Steel Jamb; Complete With Hardware And Accessories Keyed Entry Door Knob; Varnish Finish Sets 4.00 800x1200 Aluminum Panel Door On 50x150mm Steel Jamb; Complete With Hardware And Accessories Latch Lock Sets 14.00 800x2100 Solid Wood (tanguile) Panel Door 50x150mm Steel Jamb; Complete With Hardware And Accessories Keyed Entry Door Knob; Varnish Finish Sets 6.00 2400x1200 6mm Clear Ordinary Glasss On Powder Coated Aluminum Framed Sliding Type Window With 1"x1" Tubular Spaced @4in Window Grills Steel; Provide With Complete Hardware Accessories Sets 16.00 1150x1200 6mm Clear Ordinary Glasss On Powder Coated Aluminum Framed Sliding Type Window With 1"x1" Tubular Spaced @4in Window Grills Steel; Provide With Complete Hardware Accessories Sets 16.00 1200x1800 6mm Thk Tempered Glass On Powder Coated Aluminum Frame Fixed & Awning Type Window; Provide With Complete Hardware Accessories Sets 3.00 600x1600 6mm Clear Ordinary Glasss On Powder Coated Aluminum Framed Awning Type Window With 1"x1" Tubular Spaced @4in Window Grills Steel; Provide With Complete Hardware Accessories Sets 4.00 500x500 6mm Clear Ordinary Glasss On Powder Coated Aluminum Framed Awning Type Window With 1"x1" Tubular Spaced @4in Window Grills Steel; Provide With Complete Hardware Accessories Sets 2.00 F. Thermal & Moisture Protection Lot 1.00 G. Railings Lot 1.00 H. Tinsmithry Works Lot 1.00 Including Pe Insulation 10mm X Double Sided I. Miscellaneous Emergency Light. Twinhead Sets 12.00 White Board, 4'x8' With Eraser Sets 16.00 Teacher's Tables, Wooden With Cabinet Sets 8.00 Teacher's Chair Sets 8.00 Student Arm Chair, Plastic Sets 280.00 V. Electrical Works A. Roughing Ins Lot 1.00 B. Wires And Cables Lot 1.00 C. Lighting Fixtures Lot 1.00 D. Wiring Devices Lot 1.00 Vi. Mechanical Works Fire Extinguisher 10lbs Set 8.00 Fire Alarm Set 2.00 Exhaust Fan Set 6.00 Split-type Aircon, 2hp Set 2.00 Ceiling Fan Set 32.00 Consumables Lot 1.00 Folding Partition (pvc Accordion) Lot 1.00 Lavatory Counter Cabinets Lot 1.00 Viii. Plumbing Works A. Plumbing Fixtures Water Closet With Accessories (tank Type) Set 16.00 Urinal (with Privacy Partition) Set 8.00 Bidet Spray Set 16.00 Counter Lavatory With Granite And Accessories Set 18.00 Mirror Set 4.00 Lavatory Faucet Pcs 18.00 Hose Bibb Faucet Pcs 16.00 Tissue Paper Holder Pcs 16.00 Floor Drain Pcs 20.00 B. Sewer Line And Vent System Lot 1.00 C. Waterline System Lot 1.00 D. Storm Drainage System Lot 1.00 E. Others (tank) Ibc Tanks (1000l) - Rainwater Catchment Set 4.00 Water Tank - 1000l Set 2.00 Booster Pump, 1.5hp Set 1.00 Septic Tank Lot 1.00 Grand Total Cost (inclusive Of Ocm, Profit And Vat) I Hereby Certify To Comply With All The Above Technical Specifications As Per Prices Quoted In The Bill Of Quantities. Name Of Company/bidder Signature Over Printed Name Of Date Representatives Section Ix. Checklist Of Technical And Financial Documents Notes On The Checklist Of Technical And Financial Documents The Prescribed Documents In The Checklist Are Mandatory To Be Submitted In The Bid, But Shall Be Subject To The Following: A. Gppb Resolution No. 09-2020 On The Efficient Procurement Measures During A State Of Calamity Or Other Similar Issuances That Shall Allow The Use Of Alternate Documents In Lieu Of The Mandated Requirements; Or B. Any Subsequent Gppb Issuances Adjusting The Documentary Requirements After The Effectivity Of The Adoption Of The Pbds. The Bac Shall Be Checking The Submitted Documents Of Each Bidder Against This Checklist To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion Pursuant To Section 30 Of The 2016 Revised Irr Of Ra No. 9184. Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages); Or ⬜ (b) Registration Certificate From Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives Or Its Equivalent Document; And ⬜ (c) Mayor’s Or Business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas; And ⬜ (e) Tax Clearance Per E.o. No. 398, S. 2005, As Finally Reviewed And Approved By The Bureau Of Internal Revenue (bir). Technical Documents ⬜ (f) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (g) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (h) Philippine Contractors Accreditation Board (pcab) License; Or Special Pcab License In Case Of Joint Ventures; And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (i) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And (j) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (k) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (l) The Prospective Bidder’s Audited Financial Statements, Showing, Among Others, The Prospective Bidder’s Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; And ⬜ (m) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (n) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (o) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (p) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (q) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (r) Cash Flow By Quarter. Bid Form For The Procurement Of Infrastructure Projects [shall Be Submitted With The Bid] _________________________________________________________________________ Bid Form Date : _________________ Project Identification No. : _________________ To: [name And Address Of Procuring Entity] Having Examined The Philippine Bidding Documents (pbds) Including The Supplemental Or Bid Bulletin Numbers [insert Numbers], The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Declare That: A. We Have No Reservation To The Pbds, Including The Supplemental Or Bid Bulletins, For The Procurement Project: [insert Name Of Contract]; B. We Offer To Execute The Works For This Contract In Accordance With The Pbds; C. The Total Price Of Our Bid In Words And Figures, Excluding Any Discounts Offered Below Is: [insert Information]; D. The Discounts Offered And The Methodology For Their Application Are: [insert Information]; E. The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: [specify The Applicable Taxes, E.g. (i) Value Added Tax (vat), (ii) Income Tax, (iii) Local Taxes, And (iv) Other Fiscal Levies And Duties], Which Are Itemized Herein And Reflected In The Detailed Estimates, F. Our Bid Shall Be Valid Within The A Period Stated In The Pbds, And It Shall Remain Binding Upon Us At Any Time Before The Expiration Of That Period; G. If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract, Or A Performance Securing Declaration In Lieu Of The The Allowable Forms Of Performance Security, Subject To The Terms And Conditions Of Issued Gppb Guidelines For This Purpose; H. We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; I. We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And J. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Other Bid That You May Receive. K. We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The [name Of Project] Of The [name Of The Procuring Entity]. L. We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be A Ground For The Rejection Of Our Bid. Name: ___________________________________________________________________ Legal Capacity: ____________________________________________________________ Signature: ________________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: __________________________________ Date: ___________________ [bidder’s Letterhead] Name Of The Procuring Entity : Bulacan Agricultural State College Project: 2024-01-infra: Construction Of 2-storey Agroforestry Building With Rainwater Catchment Facility Location Of The Project : Doña Remedios Trinidad, Bulacan List Of All Ongoing Government & Private Contracts Including Contracts Awarded But Not Yet Started Business Name : Business Address :______________________________________________________________________ Name Of Contract/ Project Cost A. Owner’s Name B. Address C. Telephone Nos. Nature Of Work Bidder’s Role A. Date Awarded B. Date Started C. Date Of Completion % Of Accomplishment Value Of Outstanding Works / Undelivered Portion Description % Planned Actual Government Private Note: This Statement Shall Be Supported With: Total Cost 1 Notice Of Award (for Government Projects) 2 Notice To Proceed (for Government Projects) 3 Contract Submitted By : (printed Name & Signature) Designation : Date : [bidder’s Letterhead] Name Of The Procuring Entity : Bulacan Agricultural State College Project: 2024-01-infra: Construction Of 2-storey Agroforestry Building With Rainwater Catchment Facility Location Of The Project : Doña Remedios Trinidad, Bulacan Statement Of Single Largest Completed Contracts (slcc) In The Last Five (5) Years Business Name : Business Address : Name Of Contract A. Owner Name B. Address C. Telephone Nos. Nature Of Work Contractor’s Role A. Amount At Award B. Amount At Completion C. Duration A. Date Awarded B. Contract Effectivity C. Date Completed Description % Government Private Attached Herewith Are The Following Documents: Contract Agreement, Notice Of Award, Notice To Proceed, Official Receipt/invoice, Certificate Of Final Inspection, And Certificate Of Acceptance, As Evidences In Support Of The Foregoing Information, Certificate Of Good Performance Submitted By : (printed Name & Signature) Designation : ____________________________________________ Contract Agreement Form This Agreement Made The _____ Day Of __________ 20_____ Between [name Of Procuring Entity] Of The Philippines (hereinafter Called “the Entity”) Of The One Part And [name Of Supplier] Of [city And Country Of Supplier] (hereinafter Called “the Supplier”) Of The Other Part: Whereas The Entity Invited Bids For Certain Goods And Ancillary Services, Viz., [brief Description Of Goods And Services] And Has Accepted A Bid By The Supplier For The Supply Of Those Goods And Services In The Sum Of [contract Price In Words And Figures] (hereinafter Called “the Contract Price”). Now This Agreement Witnesseth As Follows: 1. In This Agreement Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Referred To. 2. The Following Documents Shall Be Deemed To Form And Be Read And Construed As Part Of This Agreement, Viz.: (a) The Supplier’s Bid, Including The Technical And Financial Proposals, And All Other Documents/statements Submitted (e.g. Bidder’s Response To Clarifications On The Bid), Including Corrections To The Bid Resulting From The Procuring Entity’s Bid Evaluation; (b) The Schedule Of Requirements; (c) The Technical Specifications; (d) The General Conditions Of Contract; (e) The Special Conditions Of Contract; (f) The Performance Security; And (g) The Entity’s Notice Of Award. 3. In Consideration Of The Payments To Be Made By The Entity To The Supplier As Hereinafter Mentioned, The Supplier Hereby Covenants With The Entity To Provide The Goods And Services And To Remedy Defects Therein In Conformity In All Respects With The Provisions Of The Contract 4. The Entity Hereby Covenants To Pay The Supplier In Consideration Of The Provision Of The Goods And Services And The Remedying Of Defects Therein, The Contract Price Or Such Other Sum As May Become Payable Under The Provisions Of The Contract At The Time And In The Manner Prescribed By The Contract. In Witness Whereof The Parties Hereto Have Caused This Agreement To Be Executed In Accordance With The Laws Of The Republic Of The Philippines On The Day And Year First Above Written. Signed, Sealed, Delivered By The (for The Entity) Signed, Sealed, Delivered By The (for The Supplier) Omnibus Sworn Statement (revised) [shall Be Submitted With The Bid] _________________________________________________________________________ Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. [insert Name Of Bidder Or Its Authorized Representative] [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Latest Rules On Notarial Practice] Bid Securing Declaration Form [shall Be Submitted With The Bid If Bidder Opts To Provide This Form Of Bid Security] Republic Of The Philippines) City Of _______________________) S.s. Bid Securing Declaration Project Identification No.: [insert Number] To: [insert Name And Address Of The Procuring Entity] I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid Securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f),of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: A. Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; B. I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And C. I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. [[insert Name Of Bidder Or Its Authorized Representative] [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Latest Rules On Notarial Practice] Net Financial Contracting Capacity Year 20 1 Total Assets 2 Current Assets 3 Total Liabilities 4 Current Liabilities 5 Net Worth (1-3) 6 Net Working Capital (2-4) The Net Financial Contracting Capacity (nfcc) Based On The Above Data Is Computed As Follows: Nfcc = [(current Assets – Current Liabilities) (15)] Minus Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Ongoing Contracts Including Awarded Contracts Yet To Be Started Coinciding With The Contract To Be Bid. The Values Of The Domestic Bidder’s Current Assets And Current Liabilities Shall Be Based On The Latest Audited Financial Statements Submitted To The Bir. Nfcc = Php Submitted By: Name Of Bidder Signature Of Authorized Representative Over Printed Name Date: _______________________________________
Closing Soon2 Dec 2024
Tender AmountPHP 25 Million (USD 423.2 K)
Department Of Agrarian Reform - DAR Tender
Others
Philippines
Details: Description Preface These Philippine Bidding Documents (pbds) For The Procurement Of Goods Through Competitive Bidding Have Been Prepared By The Government Of The Philippines For Use By Any Branch, Constitutional Commission Or Office, Agency, Department, Bureau, Office, Or Instrumentality Of The Government Of The Philippines, National Government Agencies, Including Government-owned And/or Controlled Corporations, Government Financing Institutions, State Universities And Colleges, And Local Government Unit. The Procedures And Practices Presented In This Document Have Been Developed Through Broad Experience, And Are For Mandatory Use In Projects That Are Financed In Whole Or In Part By The Government Of The Philippines Or Any Foreign Government/foreign Or International Financing Institution In Accordance With The Provisions Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184. The Bidding Documents Shall Clearly And Adequately Define, Among Others: (i) The Objectives, Scope, And Expected Outputs And/or Results Of The Proposed Contract Or Framework Agreement, As The Case May Be; (ii) The Eligibility Requirements Of Bidders; (iii) The Expected Contract Or Framework Agreement Duration, The Estimated Quantity In The Case Of Procurement Of Goods, Delivery Schedule And/or Time Frame; And (iv) The Obligations, Duties, And/or Functions Of The Winning Bidder. Care Should Be Taken To Check The Relevance Of The Provisions Of The Pbds Against The Requirements Of The Specific Goods To Be Procured. If Duplication Of A Subject Is Inevitable In Other Sections Of The Document Prepared By The Procuring Entity, Care Must Be Exercised To Avoid Contradictions Between Clauses Dealing With The Same Matter. Moreover, Each Section Is Prepared With Notes Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Shall Not Be Included In The Final Documents. The Following General Directions Should Be Observed When Using The Documents: A. All The Documents Listed In The Table Of Contents Are Normally Required For The Procurement Of Goods. However, They Should Be Adapted As Necessary To The Circumstances Of The Particular Procurement Project. B. Specific Details, Such As The “name Of The Procuring Entity” And “address For Bid Submission,” Should Be Furnished In The Instructions To Bidders, Bid Data Sheet, And Special Conditions Of Contract. The Final Documents Should Contain Neither Blank Spaces Nor Options. C. This Preface And The Footnotes Or Notes In Italics Included In The Invitation To Bid, Bid Data Sheet, General Conditions Of Contract, Special Conditions Of Contract, Schedule Of Requirements, And Specifications Are Not Part Of The Text Of The Final Document, Although They Contain Instructions That The Procuring Entity Should Strictly Follow. D. The Cover Should Be Modified As Required To Identify The Bidding Documents As To The Procurement Project, Project Identification Number, And Procuring Entity, In Addition To The Date Of Issue. E. Modifications For Specific Procurement Project Details Should Be Provided In The Special Conditions Of Contract As Amendments To The Conditions Of Contract. For Easy Completion, Whenever Reference Has To Be Made To Specific Clauses In The Bid Data Sheet Or Special Conditions Of Contract, These Terms Shall Be Printed In Bold Typeface On Sections I (instructions To Bidders) And Iii (general Conditions Of Contract), Respectively. F. For Guidelines On The Use Of Bidding Forms And The Procurement Of Foreign Assisted Projects, These Will Be Covered By A Separate Issuance Of The Government Procurement Policy Board. Table Of Contents Glossary Of Acronyms, Terms, And Abbreviations 5 Section I. Invitation To Bid 8 Section Ii. Instructions To Bidders 12 1. Scope Of Bid 13 2. Funding Information 13 3. Bidding Requirements 13 4. Corrupt, Fraudulent, Collusive, And Coercive Practices 13 5. Eligible Bidders 14 6. Origin Of Goods 14 7. Subcontracts 14 8. Pre-bid Conference 14 9. Clarification And Amendment Of Bidding Documents 15 10. Documents Comprising The Bid: Eligibility And Technical Components 15 11. Documents Comprising The Bid: Financial Component 15 12. Bid Prices 16 13. Bid And Payment Currencies 16 14. Bid Security 17 15. Sealing And Marking Of Bids 17 16. Deadline For Submission Of Bids 17 17. Opening And Preliminary Examination Of Bids 17 18. Domestic Preference 18 19. Detailed Evaluation And Comparison Of Bids 18 20. Post-qualification 19 21. Signing Of The Contract 19 Section Iii. Bid Data Sheet 20 Section Iv. General Conditions Of Contract 23 1. Scope Of Contract 23 2. Advance Payment And Terms Of Payment 23 3. Performance Security 24 4. Inspection And Tests 24 5. Warranty 24 6. Liability Of The Supplier 24 Section V. Special Conditions Of Contract 25 Section Vi. Schedule Of Requirements 28 Section Vii. Technical Specifications 29 Section Viii. Checklist Of Technical And Financial Documents 36 Glossary Of Acronyms, Terms, And Abbreviations Abc – Approved Budget For The Contract. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Cda - Cooperative Development Authority. Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Cif – Cost Insurance And Freight. Cip – Carriage And Insurance Paid. Cpi – Consumer Price Index. Ddp – Refers To The Quoted Price Of The Goods, Which Means “delivered Duty Paid.” Dti – Department Of Trade And Industry. Exw – Ex Works. Fca – “free Carrier” Shipping Point. Fob – “free On Board” Shipping Point. Foreign-funded Procurement Or Foreign-assisted Project– Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Framework Agreement – Refers To A Written Agreement Between A Procuring Entity And A Supplier Or Service Provider That Identifies The Terms And Conditions, Under Which Specific Purchases, Otherwise Known As “call-offs,” Are Made For The Duration Of The Agreement. It Is In The Nature Of An Option Contract Between The Procuring Entity And The Bidder(s) Granting The Procuring Entity The Option To Either Place An Order For Any Of The Goods Or Services Identified In The Framework Agreement List Or Not Buy At All, Within A Minimum Period Of One (1) Year To A Maximum Period Of Three (3) Years. (gppb Resolution No. 27-2019) Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Gppb – Government Procurement Policy Board. Incoterms – International Commercial Terms. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Supplier – Refers To A Citizen, Or Any Corporate Body Or Commercial Company Duly Organized And Registered Under The Laws Where It Is Established, Habitually Established In Business And Engaged In The Manufacture Or Sale Of The Merchandise Or Performance Of The General Services Covered By His Bid. (item 3.8 Of Gppb Resolution No. 13-2019, Dated 23 May 2019). Supplier As Used In These Bidding Documents May Likewise Refer To A Distributor, Manufacturer, Contractor, Or Consultant. Un – United Nations. Section I. Invitation To Bid Notes On The Invitation To Bid The Invitation To Bid (ib) Provides Information That Enables Potential Bidders To Decide Whether To Participate In The Procurement At Hand. The Ib Shall Be Posted In Accordance With Section 21.2 Of The 2016 Revised Irr Of Ra No. 9184. Apart From The Essential Items Listed In The Bidding Documents, The Ib Should Also Indicate The Following: A. The Date Of Availability Of The Bidding Documents, Which Shall Be From The Time The Ib Is First Advertised/posted Until The Deadline For The Submission And Receipt Of Bids; B. The Place Where The Bidding Documents May Be Acquired Or The Website Where It May Be Downloaded; C. The Deadline For The Submission And Receipt Of Bids; And D. Any Important Bid Evaluation Criteria (e.g., The Application Of A Margin Of Preference In Bid Evaluation). The Ib Should Be Incorporated In The Bidding Documents. The Information Contained In The Ib Must Conform To The Bidding Documents And In Particular To The Relevant Information In The Bid Data Sheet. Republic Of The Philippines Department Of Agrarian Reform Tunay Na Pagbabago Sa Repormang Agraryo Project Ref. No. 073-no-2024 Invitation To Bid Procurement Of Janitorial Services Of Dar Provincial Office Of Negros Oriental January 2025 To December 2025 1.) The Department Of Agrarian Reform Provincial Office, Dumaguete City, Province Of Negros Oriental, Through The General Appropriations Act Of Fy-2025 Intends To Apply The Sum Of One Million One Hundred Thirty Thousand One Hundred Ninety-nine Pesos Only (php 1,130,199.00) Being The Abc To Payments Under The Contract For The Procurement Of Five (5) Janitorial Services From January 1, 2025 To December 31, 2025 For Dar In Negros Oriental, With Identification Number 073-no-2024 – To Wit: Three (3) Janitorial Services For The Dar Provincial Office, Market Place, Calindagan, Dumaguete City; One (1) Janitorial Services For Dar Municipal Office, Kabulakan, Sta. Catalina, Neg. Or. And One (1) Janitorial Services For Dar Municipal Office, Canlaon City, Negros Oriental. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2.) The Department Of Agrarian Reform Provincial Office, Dumaguete City, Province Of Negros Oriental Now Invites Bids For The Above Procurement Project. Delivery Of The Janitorial Services Is Required By January 1, 2025. Bidders Should Have Completed, Within The Two-year Period From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3.) Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Nondiscretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. B. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The 2016 Revised Irr Of Ra No. 9184. 4.) Prospective Bidders May Obtain Further Information From Department Of Agrarian Reform Provincial Office Of Negros Oriental - General Services Unit, Market Place, Calindagan, Dumaguete City, And Inspect The Bidding Documents At The Address Given Below During Office Hours, Monday To Friday From 8:00 O’clock In The Morning To 5:00 O’clock In The Afternoon. 5.) A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 25, 2024, Mondays To Fridays From 8:00 O’clock In The Morning To 5:00 O’clock In The Afternoon From The Given Address, And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos Only (php 5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees An Official Receipt Paid To The Dar Cashier, If It Will Be Presented In Person, By Facsimile, Or Through Electronic Means. 6.) The Dar Provincial Office Of Dumaguete City, Negros Oriental, Through The Bac Will Hold A Pre-bid Conference On December 2, 2024 At 9:00 O’clock In The Morning At The Dar, Market Place, Calindagan, Dumaguete City, As Such, Face To Face , And/or Through Video Conferencing Or Webcasting Via Application Or Technology To Be Used, Such As Messenger Or Zoom Link, Which Shall Be Open To Prospective Bidders. 7.) Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before December 16, 2024, 10:00 O’clock In The Morning. Late Bids Shall Not Be Accepted. 8.) All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9.) Bid Opening Shall Be On December 16, 2024 At 1:00 O’clock In The Afternoon At The Given Address Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10.) The Dar Provincial Office Of Dumaguete City, Negros Oriental, Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11.) For Further Information, Please Refer To: Anthony Rey D. Lobrido Dar Dumaguete General Services Unit Dar Provincial Office Dumaguete City, Negros Oriental The Market Place, Calindagan Email Add: Gsudarnegor2018@gmail.com (035) 531-3448/0905-542-4359 12.) You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps For Online Bid Submission: Email Add: Gsudarnegor2018@gmail.com November 22, 2024 Sgd. Lilany P. Dipaling Bac Chairperson Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, Department Of Agrarian Reform Provincial Office Of Dumaguete City, Negros Oriental, Wishes To Receive Bids For The Procurement Of Five (5) Janitorial Services With Identification Number 073-no-2024. The Procurement Project (referred To Herein As “project”) The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For Fy-2025 In The Amount Of One Million One Hundred Thirty Thousand One Hundred Niety-nine Pesos Only (php 1,130,199.00). 2.2. The Source Of Funding Is: A. Nga, The General Appropriations Act Or Special Appropriations. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. A. Foreign Ownership Exceeding Those Allowed Under The Rules May Participate Pursuant To: Iii. When The Goods Sought To Be Procured Are Not Available From Local Suppliers; Or B. Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts The Procuring Entity Has Prescribed That: B. Subcontracting Is Not Allowed. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On December 2, 2024 At 9:00 O’clock In The Morning At Its Physical Address Conference Room, Dar, Market Place, Calindagan, Dumaguete City. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within Two Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In The Bds. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In The Bds. 12.2. (not Applicable) 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration1 Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until April 15, 2025. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 14.3. (not Applicable) 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On Or Before 10:00 O’clock In The Morning At Dar Provincial Office Of Negros Oriental, The Marketplace, Calindagan, Dumaguete City, Negros Oriental Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 16.2. (not Applicable) 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 18.2. (not Applicable) 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.2 (not Applicable) 19.3 The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4 The Project Shall Be Awarded As : One Project Having Several Items Grouped Into Several Lots, Which Shall Be Awarded As Separate Contracts Per Lot. 19.5 Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19. Post-qualification 20.1. (not Applicable) 20.2. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, That It Is One Of The Eligible Bidders Who Have Submitted Bids That Are Found To Be Technically And Financially Compliant, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 20. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. 21.2. (not Applicable) 21.3. (not Applicable) 21.4. (not Applicable) 21.5. (not Applicable) Section Iii. Bid Data Sheet Notes On The Bid Data Sheet The Bid Data Sheet (bds) Consists Of Provisions That Supplement, Amend, Or Specify In Detail, Information, Or Requirements Included In The Itb Found In Section Ii, Which Are Specific To Each Procurement. This Section Is Intended To Assist The Procuring Entity In Providing The Specific Information In Relation To Corresponding Clauses In The Itb And Has To Be Prepared For Each Specific Procurement. The Procuring Entity Should Specify In The Bds Information And Requirements Specific To The Circumstances Of The Procuring Entity, The Processing Of The Procurement, And The Bid Evaluation Criteria That Will Apply To The Bids. In Preparing The Bds, The Following Aspects Should Be Checked: A. Information That Specifies And Complements Provisions Of The Itb Must Be Incorporated. B. Amendments And/or Supplements, If Any, To Provisions Of The Itb As Necessitated By The Circumstances Of The Specific Procurement, Must Also Be Incorporated. Bid Data Sheet Itb Clause 1.1 The Procuring Entity Is The Department Of Agrarian Reform-negros Oriental. The Name Of The Contract Is Procurement Of Janitorial Services For The Dar In Negros Oriental – For Cy 2025. The Identification Number Of The Contract Is 073-no-2024. 2 The Funding Source Is: The Government Of The Philippines (gop) Through The General Appropriations Act Of Fy-2025 In The Amount Of Php 1,130,199.00. The Name Of The Project Is: Procurement Of Janitorial Services For The Dar In Negros Oriental For Cy 2025. 5 The Bidder Must Have Completed, Within The Period Specified In The Invitation To Bid And Itb Clause 12.1(a)(ii), A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty-five Percent (25%) Of The Abc. For This Purpose, Similar Contracts Shall Refer To The Procurement Of Janitorial Services. 7.1 (not Applicable) 12 (not Applicable) 12.1(a)(ii) The Bidder’s Slcc Similar To The Contract To Be Bid Should Have Been Completed Within Three (3) Years Prior To The Deadline For The Submission And Receipt Of Bids. 13 A Detailed Wage Cost Breakdown For Each Janitor, Which Must Include The Cost Of Supplies And Equipment Necessary For The Execution Of The Contract, Stating The Following: • Amount Paid Directly To Janitor • Amount Paid Directly To Government In Favor Of Janitor • Amount For Supplies, Which Must Include The Following Minimum Supply And Material Requirements: 1) Brooms 2) Long-handled Brooms 3) Broomstick (“walis Tingting”) 4) Rags For Dusting 5) Floor Mops 6) Dustpans 7) Doormats For Crs 8) Toilet Bowl Cleaner 9) Disinfectant 10) Toilet Brush 11) Toilet Bowl Pump 12) Toilet Deodorant Cake 13) Detergent Soap • Profit Margin • Vat The Wage Cost Breakdown Should Reflect The Contract Rate Per Janitor Per Month. For Bid Price Computation, The Said Contract Rate Per Janitor Multiplied By The Number Of Janitors Multiplied By The Number Of Months. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than Php 22,603.98, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than Php 56,509.95, If Bid Security Is In Surety Bond. 19.3 One Lot For The Procurement Of Janitorial Services, 3 Janitors Assigned At Dar Provincial Office Of Negros Oriental And 1 Janitor Assigned At Darmo Sta. Catalina, Negros Oriental, And 1 Janitor Assigned At Darmo Canlaon City, Negros Oriental. 20.2 A. Latest Income And Business Tax Returns Filed And Paid Through Bit Electronic Filing And Payment System (efps) Note: The Latest Income And Business Tax Returns Are Those Within The Last Six (6) Months Preceding The Date Of Bid Submission C. Certificate Of Philgeps Registration 21.2 Income And Business Tax Returns Filed And Through The Bir Electronic Filing And Payment System (efps), Consisting Of The Following; - 2024 Income Tax Return With Proof Of Payment - Vat Returns Or Percentage Tax Returns With Proof Of Payment Covering The Year 2024 29.2 1. Nlrc And Dole Clearance (no Final Judgment/decision Finding Illegal Dismissal, Failure To Pay Minimum Wage, Unfair Labor Practice, And The Like) 2. For Sss, Philhealth And Pag-ibig Premium Contributions: Proof Of Remittance For The 2nd And 3rd Quarters Of 2023 Stamped “received” With Corresponding Ors And Listing Of Members Covered By Such Remittance Section Iv. General Conditions Of Contract Notes On The General Conditions Of Contract The General Conditions Of Contract (gcc) In This Section, Read In Conjunction With The Special Conditions Of Contract In Section V And Other Documents Listed Therein, Should Be A Complete Document Expressing All The Rights And Obligations Of The Parties. Matters Governing Performance Of The Supplier, Payments Under The Contract, Or Matters Affecting The Risks, Rights, And Obligations Of The Parties Under The Contract Are Included In The Gcc And Special Conditions Of Contract. Any Complementary Information, Which May Be Needed, Shall Be Introduced Only Through The Special Conditions Of Contract. 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1. Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2. The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 2.3. (not Applicable) 2.4 (not Applicable) 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184 4. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Vii (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 5.2 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Special Conditions Of Contract Notes On The Special Conditions Of Contract Similar To The Bds, The Clauses In This Section Are Intended To Assist The Procuring Entity In Providing Contract-specific Information In Relation To Corresponding Clauses In The Gcc Found In Section Iv. The Special Conditions Of Contract (scc) Complement The Gcc, Specifying Contractual Requirements Linked To The Special Circumstances Of The Procuring Entity, The Procuring Entity’s Country, The Sector, And The Goods Purchased. In Preparing This Section, The Following Aspects Should Be Checked: A. Information That Complements Provisions Of The Gcc Must Be Incorporated. B. Amendments And/or Supplements To Provisions Of The Gcc As Necessitated By The Circumstances Of The Specific Purchase, Must Also Be Incorporated. However, No Special Condition Which Defeats Or Negates The General Intent And Purpose Of The Provisions Of The Gcc Should Be Incorporated Herein. Special Conditions Of Contract Gcc Clause 1 Delivery And Documents Report On The Delivery Of The Janitorial Services Shall Be Submitted By The Janitorial Agency Monthly Basis Covering The Period January 2, 2025 To December 31, 2025. Upon Delivery Of The Janitorial Services To The Project Site, The Janitorial Agency Shall Notify The Procuring Entity And Present The Following Documents To The Procuring Entity: - Copy Of Payslips And Evidences Of Receipt By The Janitorial Personnel; - Proof Of Monthly Remittance Of Premiums To Sss, Philhealth, Hdmf And Ecc For The Benefits Of The Janitorial Personnel Obligations Of The Service Provider: Janitorial Agency Shall Provide 5 Janitorial Personnel, One Will Be Assigned To Monitor And Supervise Janitorial Workers. The Janitors/janitress Must Be: - A. Of Good Moral Character And Without Criminal Or Police Records; - B. Physically And Mentally Fit, As Evidenced By A Medical Certificate; - C. Duly Trained And Skilled To Function As Janitorial Personnel; - D. At Least One Of The Janitors To Be Deployed Shall Have Skills In Minor Carpentry, Masonry Works And The Like. - The Janitorial Agency Shall Assign A Roving Supervisor At Its Own Account, Separate From The One Janitorial Supervisor, To Monitor The Performance Of The Janitorial Personnel - Duties Of The Janitorial Supervisor Shall Include, But Not Limited To The Following; A. Makes Rounds To Check His/her Subordinates, Provides Special Cleaning Instructions And Other Assignments And Ascertains Compliance With Directives To Be Issued By Darpo Negros Oriental From Time To Time; B. Inspects And Checks Cleanliness And Orderliness Of The Premises, And Informs His/her Subordinates Of Correction Necessary And Additional Work And Task A Noted; C. Determines Materials, Supplies Needed And Timely Informs The Head Of The General Services Section; D. Handles The Consolidation Of Daily Timecards Periodically In Preparation Of The Monthly Billing Of Darpo Negros Oriental. Duties And Functions Of The Janitorial Personnel: - Maintains The Cleanliness And Orderliness Of The Offices, Building And Premises In Accordance With The Service Level Agreement (see Annex B) And The Housekeeping Plan To Be Submitted By The Janitorial Agency During Contract Implementation, Taking Into Account The Following; A. Protection Of Dar Properties From Damage Or Destruction In Connection With The Janitorial Services Rendered; B. Preservation Of Confidentiality Of Dar Records; C. Proper Collection And Disposal Of Garbage; D. Accordance Of Due Respect And Deterrence To Dar Officials, Personnel, Guests And Clients. - Miscellaneous Services To Be Performed Whenever Required, I.e. Logistical Assistance During Meetings And Conferences, Hauling/moving Or Transferring Of Office Furniture, Fixtures, Document Files And Equipment, And Other Necessary Errand Works Within And Outside The Dar Premises, Darmo Sta. Catalina And Darmo Canlaon City, As Requested By Dar Officials And Personnel. The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: Janitorial And Maintenance Services Consisting Of, But Not Limited To The Following Operations: A. Daily Routine Operations - Sweeping, Mopping, Scrubbing And Polishing Of All Floors, And Other Areas As The Procuring Entity May So Specify. All Areas In The Two Sites Mentioned Shall Be Serviced Continuously During Hours Of Public Use To Maintain Cleanliness; - Vacuum, Cleaning Of Carpets, Rugs And Draperies, - Cleaning And Sanitizing Of Comfort Rooms And Washrooms Using Disinfecting Agents; - Dusting And Cleaning Of Horizontal And Vertical Surfaces Which Require Daily Attention; - Disposal Of Trash From The Confines Of The Sites Mentioned; - Do Other Works, Not Involving Money Matters, Required By The Procuring Entity B. Weekly Periodic Operations - Washing, Scrubbing, Waxing And Polishing Of All Floors Occupied By The Procuring Entity; - Cleaning Of Glass Walls, Windows, Door Frames And Other Sectoral Partitions; - Cleaning, Waxing And Polishing Of Office Furniture, Fixtures, Counters, Excluding Equipment That Requires Specialized Maintenance. C. Monthly Periodic Operations - Thorough General Cleaning And Waxing Of All Floors In Areas Covered By The Contract; - Cleaning Of Light Bulbs, Fluorescent Lights, And Other Fixtures As The Procuring Entity May So Require; - Thorough General Cleaning, Sanitizing, And Disinfecting Of All Washrooms And Comfort Rooms. 2.2 Payment Terms And Conditions A. The Service Provider Shall Pay The Personnel Based On The Computation (see Annex A) And Will Adopt Any Increase Based On Dole Mandate. B. The Service Provider Shall Submit Along With The Monthly Billing Statement, A Certified True Copy Of Duly Accomplished Payroll Sheet, Receipt And Prescribed Reports Stamped Received By Sss, Philhealth, As Proof Of Remittance For Sss And Philhealth Premiums Of The Janitorial Personnel. C. Darpo Neg Or Shall Pay The Service Provider Not Later Than The 15th And 30th Of Last Calendar Day Of The Following Month Based On The Billing Statement Which Should Be Submitted To Darpo Neg Or Not Later Than 7th And 21st Day Of Each Month For The Duration Of The Contract. 4 The Inspections And Tests That Will Be Conducted Are: Physical Inspection Of Personnel. Section Vi. Schedule Of Requirements The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Department Of Agrarian Reform, Market Place, Calindagan, Dumaguete City. Item Number Description Quantity (monthly) Delivered, Weeks/months 1 Janitors Or Utility Workers For The Dar Provincial Office 3 12 Months 2 Janitor Or Utility Worker For The Dar – Canlaon City 1 12 Months 3 Janitor Or Utility Worker For The Dar – Resettlement 1 12 Months The Service Provider Shall Perform Janitorial And Maintenance Services For Eight (8) Hours Per Day, Mondays To Saturdays, Exclusive Of Sundays, Starting From January 1, 2025 To December 31, 2025; From 6:00 O’clock To 11:00 O’clock In The Morning And From 1:00 O’clock To 4:00 O’clock In The Afternoon. I Hereby Certify To Comply And Deliver The Above Requirements Upon Commencement Of The Contract. _____________________ _________________________ ___________ Name Of Company/bidder Signature Over Printed Name Of Date Representative Section Vii. Technical Specifications Notes For Preparing The Technical Specifications A Set Of Precise And Clear Specifications Is A Prerequisite For Bidders To Respond Realistically And Competitively To The Requirements Of The Procuring Entity Without Qualifying Their Bids. In The Context Of Competitive Bidding, The Specifications (e.g. Production/delivery Schedule, Manpower Requirements, And After-sales Service/parts, Descriptions Of The Lots Or Items) Must Be Prepared To Permit The Widest Possible Competition And, At The Same Time, Present A Clear Statement Of The Required Standards Of Workmanship, Materials, And Performance Of The Goods And Services To Be Procured. Only If This Is Done Will The Objectives Of Transparency, Equity, Efficiency, Fairness, And Economy In Procurement Be Realized, Responsiveness Of Bids Be Ensured, And The Subsequent Task Of Bid Evaluation And Post-qualification Facilitated. The Specifications Should Require That All Items, Materials And Accessories To Be Included Or Incorporated In The Goods Be New, Unused, And Of The Most Recent Or Current Models, And That They Include Or Incorporate All Recent Improvements In Design And Materials Unless Otherwise Provided In The Contract. Samples Of Specifications From Previous Similar Procurements Are Useful In This Respect. The Use Of Metric Units Is Encouraged. Depending On The Complexity Of The Goods And The Repetitiveness Of The Type Of Procurement, It May Be Advantageous To Standardize The General Technical Specifications And Incorporate Them In A Separate Subsection. The General Technical Specifications Should Cover All Classes Of Workmanship, Materials, And Equipment Commonly Involved In Manufacturing Similar Goods. Deletions Or Addenda Should Then Adapt The General Technical Specifications To The Particular Procurement. Care Must Be Taken In Drafting Specifications To Ensure That They Are Not Restrictive. In The Specification Of Standards For Equipment, Materials, And Workmanship, Recognized Philippine And International Standards Should Be Used As Much As Possible. Where Other Particular Standards Are Used, Whether National Standards Or Other Standards, The Specifications Should State That Equipment, Materials, And Workmanship That Meet Other Authoritative Standards, And Which Ensure At Least A Substantially Equal Quality Than The Standards Mentioned, Will Also Be Acceptable. The Following Clause May Be Inserted In The Special Conditions Of Contract Or The Technical Specifications. Sample Clause: Equivalency Of Standards And Codes Wherever Reference Is Made In The Technical Specifications To Specific Standards And Codes To Be Met By The Goods And Materials To Be Furnished Or Tested, The Provisions Of The Latest Edition Or Revision Of The Relevant Standards And Codes Shall Apply, Unless Otherwise Expressly Stated In The Contract. Where Such Standards And Codes Are National Or Relate To A Particular Country Or Region, Other Authoritative Standards That Ensure Substantial Equivalence To The Standards And Codes Specified Will Be Acceptable. Technical Specifications Item Specification Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] 1. Duration Of The Janitorial Contract To Be Bid Shall Be For 12 Months Covering The Period January 2 – December 31, 2025 2. The Approved Budget For The Contract For 12 Months. The Abc Is Fixed And Shall Not Be Adjusted During Contract Implementation Except For The Following: A. Increase In Daily Wage Pursuant To Law Or New Wage Order Issued After Date Of Bidding; B. Increase In Taxes And Mandatory Government Contributions; C. Increase Or Decrease In The Number Of Janitors Required By Dar Provided That The Increase Follows The Approval Rate In The Contract. 3. Obligation Of The Service Provider 4. Service Level Agreement: 1. The Service Provider Agrees That Darpo Negros Oriental, Through The General Services Section, Reserves The Right To Screen And Accept Or Deny The Deployment Of Any Personnel Recommended By The Service Provider. 2. The Deployed Personnel Shall Work Eight (8) Hours A Day, Six (6) Days A Week From Monday To Saturday, 7am - 4pm Assigned In Darpo Negros Oriental And 8am - 5pm Assigned In Darmos Canlaon And Sta. Catalina, Negros Oriental. However, Personnel May Be Requested To Help Outside The Working Hours, Upon Written Approval Of The Provincial Chief Administrative Officer. 3. Darpo Negros Oriental Has The Right To Effect Changes In The Assignment/deployment Of The Janitors At Any Time During The Contract Period. 4. Hold Darpo Negros Oriental Free From Any Action Or Liability Arising From Any Claims Of The Janitorial Personnel And Other Personnel Employed By The Agency For Benefits Under The Labor Code Of The Philippines. Any Increase In Wage, Social Security Contributions, Or Any Similar Payments As May Be Imposed By Law Or Competent Authority Shall Be Automatically Readjusted Subject To The Accounting And Auditing Rules And Regulations And Upon Showing Actual Payment Made To Their Employees. There Shall Be No Employer – Employee Relationship Between Darpo Negros Oriental And The Janitorial Personnel. 5. The Service Provider Shall Be Responsible For Any Loss Or Damage To Dar Properties And Premises, Provided That Such Loss Or Damage Shall Not Include Those Caused By Fortuitous Events Such As Earthquakes, Typhoon, War, Rebellion, Fire Excluding Strikes And Pickets, And That Such Loss Or Damage Are Reported To The Service Provider Verbally Or In Writing Seven (7) Working Days From The Time The Loss Or Damage Reached The Department’s Knowledge. An Appropriate Investigation Shall Be Jointly Conducted Thereafter And Should The Result Of The Dar Property Is The Liability Of The Concerned Janitor, The Amount Of Damages Or Property Losses Shall Be Deducted From The Collectible Amount Due To The Janitorial Agency At The End Of The Contract Period. 6. Accordingly, Darpo Negros Oriental Shall Not Be Responsible For Any And All Claims For Personal Injury Or Damage, Including Death Caused Either To Any Of The Janitors Or Any Third Person Where Such Injury Or Death Arises Out Of Or In The Courses Of The Lawful Performance Of Janitorial Functions Of Said Janitors. It Is The Responsibility Of The Service Provider To Closely Supervise, Coordinate, Control And Monitor The Discharge Of The Duties By The Janitor In Accordance With The Terms Stipulated Herein. 7. The Service Provider Shall Always Make Available Relievers And/or Replacement Janitors To Ensure Continuous And Uninterrupted Services. 8. Subcontracting Of Any Work At The Darpo Negros Oriental By The Service Provider Shall Not Be Allowed. 9. The Service Provider Shall Pay Its Personnel Not Less Than The Minimum Wage And Other Benefits Mandated By Law And Shall Provide The Janitorial Personnel With Their Monthly Pay Slip Containing The Necessary Information On It. The Service Provider Shall Comply With The Laws Governing Labor Standards And Employees’ Compensation. A Certificate For The Purpose Shall Be Required From The Service Provider. 10. The Service Provider, In The Performance Of This Service Shall Secure, Maintain At Its Own Expenses All Registration, License Or Permits Required By Law And Shall Comply With All Pertinent Rules And Regulations. The Service Provider’s Personnel Shall Take All The Necessary Precaution For The Safety Of All Persons And Properties At Or Near Their Area Of Work And Shall Comply With All The Standards And Established Safety Regulations, Rules, And Practices. 11. The Service Provider Shall Provide The Personnel With Appropriate Uniforms And Ensure That They Shall Observe Proper Hygiene And Appear Neat And Clean During Their Work Shifts. 12. The Service Provider Shall Ensure That Safety Shall Be The First Priority In The Performance Of Its Functions And Avoid The Creation Of Safety Hazards Both In The Condition Of The Work Performed And While Doing Their Tasks. 13. At The End Of The Contract Period, The Service Provider Shall Turn Over To Darpo Negros Oriental All Property Accountability And Any Amount Of Damages Or Property Losses Shall Be Deducted From The Collectible Amount Due To The Janitorial Agency. 14. The Service Provider Shall Subject Its Maintenance Personnel To An Annual Psychological, Drug, Alcohol, Or Other Related Tests From Government Accredited Testing Centers. 15. Darpo Negros Oriental Shall Have The Right To Automatically Terminate The Contract In Case Any If The Stipulations And Covenants Area Violated By The Service Provider Upon Notice To The Later. Darpo Negros Oriental Shall Be Entitled To Damages As May Be Granted And/or Awarded To It In The Courts Of Law And Shall Have The Right To Unilaterally Renegotiate And/or Award The Unfinished Services To Another Agency In Accordance With The Revised Implementing Rules And Regulations Of Ra 9184 And Related Government Procurement Policy Board (gppb) Issuances. 16. Darpo Negros Oriental Shall Provide Cleaning Device And Equipment To Be Used By The Janitorial Personnel. 5. Stability • 3 Years Experience • P200,000.00 Cash Account • Well-defined Organizational Set-up 6. Resources • 30 Janitors/utility Workers Within Negros Oriental • 4 Supervisors Within Negros Oriental (at Least 2 Are Based In Dumaguete City) • 1 4-wheel Transportation Vehicle • At Least Five (5) Vacuum Cleaners Or Similar Cleaning Devices 7. Others • Policy Directives On Recruitment And Selection Of Janitors • Two Sets Of Complete Uniform • Technical Documents: 1. Company Profile 2. Organizational Chart 3. List Of Clients For The Past Three Years The Agency Contractor Shall Maintain A Satisfactory Level Of Performance Throughout The Term Of The Contract Based On The Following Set Of Performance Criteria: 1. Quality Service Delivered 2. Time Management 3. Management And Suitability Of Personnel 4. Contract Administration And Management 5. Regular Progress Report The Dar May Assess These Criteria Though The Agency Contractor’s: 1. Monthly Evaluation Form; 2. Monthly Feedback Form; 3. Biometric Or Logbook Of Attendance; 4. Wearing Of Uniform; 5. Completion Slip/form; And 6. Team Leader’s Monitoring Report, Etc. I Hereby Certify To Comply With All Of The Above Technical Specifications. _____________________ _________________________ ____________ Name Of Company/bidder Signature Over Printed Name Of Date Representative Section Viii. Checklist Of Technical And Financial Documents Notes On The Checklist Of Technical And Financial Documents The Prescribed Documents In The Checklist Are Mandatory To Be Submitted In The Bid, But Shall Be Subject To The Following: A. Gppb Resolution No. 09-2020 On The Efficient Procurement Measures During A State Of Calamity Or Other Similar Issuances That Shall Allow The Use Of Alternate Documents In Lieu Of The Mandated Requirements; Or B. Any Subsequent Gppb Issuances Adjusting The Documentary Requirements After The Effectivity Of The Adoption Of The Pbds. The Bac Shall Be Checking The Submitted Documents Of Each Bidder Against This Checklist To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion Pursuant To Section 30 Of The 2016 Revised Irr Of Ra No. 9184. Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages); In Accordance With Section 8.5.2 Of The Ir; Or ⬜ (b) Registration Certificate From Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives Or Its Equivalent Document, And ⬜ (c) Mayor’s Or Business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas; And ⬜ (d) Tax Clearance Per E.o. No. 398, S. 2005, As Finally Reviewed And Approved By The Bureau Of Internal Revenue (bir). Technical Documents ⬜ (e) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (f) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ (g) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And ⬜ (h) Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or Aftersales/parts, If Applicable; And ⬜ (i) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (j) The Supplier’s Audited Financial Statements, Showing, Among Others, The Supplier’s Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; And ⬜ (k) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc); Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents ⬜ (l) If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (m) Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (n) Original Of Duly Signed And Accomplished Price Schedule(s). Other Documentary Requirements Under Ra No. 9184 (as Applicable) ⬜ (o) [for Foreign Bidders Claiming By Reason Of Their Country’s Extension Of Reciprocal Rights To Filipinos] Certification From The Relevant Government Office Of Their Country Stating That Filipinos Are Allowed To Participate In Government Procurement Activities For The Same Item Or Product. ⬜ (p) Certification From The Dti If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity.
Closing Soon3 Dec 2024
Tender AmountPHP 1.1 Million (USD 19.1 K)
Department Of Education Division Of Ilocos Sur Tender
Machinery and Tools
Philippines
Details: Description Invitation To Bid Pb-020-2024 Supply And Delivery Of Technical Vocational Livelihood (tvl) Equipment Packages For Public Senior High Schools 1. The Department Of Education, Schools Division Of Ilocos Sur Through The Republic Act No. 11975 – Fy 2024 Gaa (sub-allotment Release Order No. Roi-24-1175) Intends To Apply The Sum Of Two Million Three Hundred Thirty-six Thousand Two Hundred Eighty Pesos (p2,336,280.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Project Supply And Delivery Of Vocational Livelihood (tvl) Equipment Packages For Public Senior High Schools. Bids Received Higher Than The Abc Shall Be Automatically Rejected At Bid Opening. Item No. Project Description Qty. Unit Unit Cost Abc For The Project (in Php) Tvl Tools & Equipment (bread And Pastry Production) 1 Air Compressor With Airbrush Cake Decorating Set (medium) Pc 1 2,414.00 2,414.00 2 Beater (standard) Pc 6 287.00 1,722.00 3 Board, Chopping, 6 Color Rectangular Material: Plastic (polypropylene), Food Grade Board Size: Length: 38 Cm (minimum) Width: 30 Cm (minimum) Thickness: 1.27 Cm (minimum) Color-coded For Use With Different Types Of Food, Blue, Red, Yellow, Green, Brown And White, Preferably Packed In Set Set 6 920.00 5,520.00 4 Boiler, Double (material: Stainless Steel Thickness: 1/16 Inch (1.5 Mm) (minimum) Lid Material: Glass Riveted Handle On Both Side Diameter: 9 1/2 Inches (minimum) Total Height: 9.4 Inches (minimum) Inset Bottom Diameter: 9 Inches (minimum) Inset Top Diameter: 9 Inches (minimum) Capacity: 2 Liters (minimum) Must Be A Set Which Includes One (1) Saucepan, One (1) Boiler, And One (1) Lid With Stainless Steel Handle And Smooth Surfaces With No Sharp Edges) Set 1 1,955.00 1,955.00 5 Bowl, Mixing (6 Pcs/set) Pc 12 2,415.00 28,980.00 6 Cake Pans, Round #4, #6, #8, #10, #12, #14, #16 Pc 6 1,725.00 10,350.00 7 Cake Stand, With Tier (type: Cake Stand With Tier, Food Grade Body Shape: Circular With 3 Tiers Material: Hard Plastic, Polypropylene, 4 Mm Thick The Tier Consists Of The Following Sizes: Tier 1: 18 Cm Diameter (minimum) Tier 2: 25 Cm Diameter (minimum) Tier 3: 30 Cm Diameter (minimum) Column Diameter: 20 To 30 Mm (solid) Distance Between Tiers: 15 Cm Over-all Length: 30 Cm (minimum) Pc 6 1,725.00 10,350.00 8 Cake Turn Table (body Shape: Circular Material: Cast Aluminum Plate. And Cast-iron Base Upper Plate: 30 Cm Diameter (minimum) And 1.4 Cm Thickness (minimum) Base Dimensions: 18 Cm (minimum); 1.4 Cm Thickness (minimum) Total Height: 10 Cm To 15 Cm) Pc 3 1,265.00 3,795.00 9 Coupler (tubular Material: Hard Plastic, Polypropylene, Any Bright Color Height: 3cm (minimum) Top Diameter: 1.27 Cm (minimum) Bottom Diameter: 2.54 Cm (minimum) Preferably With Storage Case) Pc 13 207.00 2,691.00 10 Cup, Measuring (for Solid) The Standard 4 Measuring Cup Sizes Are: 1 Cup, 1/2 Cup, 1/3 Cup And 1/4 Cup Set 12 977.00 11,724.00 11 Cup, Measuring, 250 Ml For Liquid Pc 12 632.00 7,584.00 12 Cup, Measuring, 500ml For Liquid Pc 12 747.00 8,964.00 13 Cutter, Dough (stainless Steel Straight Blade With Stainless Steel Handle Blade Dimension: Length: 15 Cm X Width: 11 Cm X Thickness: 1.2mm(minimum) Handle Dimension: Length: 15 Cm X Diameter: 3 Cm (minimum) Preferably With Packing Case Food Grade And Dishwasher Safe Design Allows Item To Be Hung For Storage) Pc 1 402.00 402.00 14 Cutter, Pie (medium) Pc 6 460.00 2,760.00 15 Flour Sifter, Hand Cranked (standard) Round Shape Material: Stainless Steel Dimension: Diameter: 133.3 Mm (minimum) X Height: 165 Mm (minimum) Thickness: 0.79 Mm (minimum) (body) And Constructed With Stainless Steel Wire Mesh #30 Bottom Volume Markings Should Be Seen Inside And Outside Of The Sifter Capacity: 5 Cups (1.18 Liter) Pc 6 747.00 4,482.00 16 Grater 4 Sided (s) Pc 6 402.00 2,412.00 17 Knife, Kitchen (s) Pc 6 747.00 4,482.00 18 Knife, Pallet (s) Pc 6 573.00 3,438.00 19 Ladle, 3 0z Pc 6 241.00 1,446.00 20 Loaf Pan Big Pc 6 862.00 5,172.00 21 Loaf Pan, Medium Pc 6 517.00 3,102.00 22 Loaf Pan, Small Pc 6 126.00 756.00 23 Muffin Pan, Big Pc 6 448.00 2,688.00 24 Muffin Pan, Medium Pc 6 414.00 2,484.00 25 Muffin Pan, Small Pc 6 322.00 1,932.00 26 Pie Pan, 10 Inches Diameter Pc 6 517.00 3,102.00 27 Pie Pan, # 6, #8, #10 Set 6 1,265.00 7,590.00 28 Pillars, Cake (big) Pc 6 517.00 3,102.00 29 Piping Bag (100 Pcs Per Pack) (m) Pack 25 241.00 6,025.00 30 Rectangular Pan, (7” X 11”) Pc 4 263.00 1,052.00 31 Rolling Pins (3cm X 10 Cm) Pc 12 402.00 4,824.00 32 Rubber Scraper (m) Pc 12 207.00 2,484.00 33 Sauce Pan 22cm Pc 13 632.00 8,216.00 34 Sheet Pan (m) Pc 15 517.00 7,755.00 35 Spoon, Measuring (plastic) ¼ Teaspoon, ½ Teaspoon, 1 Teaspoon, And 1 Tablespoon Set 26 287.00 7,462.00 36 Spoon, Wooden (s) Pc 15 92.00 1,380.00 37 Strainer Stainless (m) Pc 15 212.00 3,180.00 38 Tip, Decorating X 24 (small To Large) Set 23 632.00 14,536.00 39 Weighing Scale, 10 Kgs (digital) Pc 13 2,875.00 37,375.00 40 Weighing Scale,5 Kgs, (digital) Pc 13 1,265.00 16,445.00 41 Wire Whisk, Medium Ballon Material: Heavy Duty Stainless Steel Dimensions (l X W): 31.8 Cm X 7.6 Cm (minimum) Handle Length: 12 Cm (minimum) With Hanging Loop No. Of Wires: 8 Wires Wire Diameter: 2 Mm (minimum) Preferably With A Packing Case Pc 13 286.00 3,718.00 Sub Total 259,851.00 Tvl Tools & Equipment (computer System Servicing) 42 Allen Wrench (set Of 10 Pieces: 1.5 Mm, 2 Mm, 2.5 Mm, 3 Mm, 4 Mm, 5 Mm, 5.5 Mm, 6 Mm, 8 Mm, 10 Mm;) Set 50 450.00 22,500.00 43 Anti-static Device (anti-static Wrist Strap) Adjustable And Elastic Wristband With Integrated 1 Mega Ohm Resistor Pc 50 250.00 12,500.00 44 Combination Pliers, 8" Pc 50 350.00 17,500.00 45 Crimping Tool (rj 11/45) Pc 52 450.00 23,400.00 46 Desoldering Pump (plastic Or Aluminum Housing) Pc 52 250.00 13,000.00 47 Electric Drill, Portable (rated Voltage: 220 / 240 Volts, Ac 60 Hz Power In Watts: 550 To 650 Watts) Pc 4 4,000.50 16,002.00 48 External Optical Drive Cd-r Dvd-r (interface: Usb 3.0 Or Better; 2. Compatibility: Windows 2000, Xp, Vista, 7, 8, 10, Apple Mac, Linux Or Better; 3. Read Speed: At Least 8x Dvd, At Least 24x Cd; 4. Write Speed: At Least 4x Dvd, At Least 16x Cd) Pc 6 1,000.00 6,000.00 49 Flash Drive (1tb) Pc 52 850.00 44,200.00 50 Flashlight, Head-mounted (rechargeable) Minimum Of 160 Lumens; Beam Distance: Minimum Of 150 Meters; Includes 220 V Ac Charger/power Adaptor (or Equivalent) Pc 50 550.00 27,500.00 51 Hub / Switch ( Standards And Protocols: Ieee 802.3, Ieee802.3u, Ieee802.3x Csma/cd Interface: 8 10/100mbps Ports, Auto-negotiation, Auto-mdi/mdix External Power Supply Adapter: 100-240vac,50/60hz Fanless Data Rates: 10/100mbps At Half Duplex; 20/200mbps At Full Duplex Led Indicator: Power, 1, 2, 3, 4, 5, 6, 7, 8 Dimensions: 5.3 X 3.1 X 0.9 In. (134.5 X 79 X 22.5mm) (approx.) Pc 42 2,000.00 84,000.00 52 Lan Cable Tester (1. Package Contents: 8-port 10/100mbps Desktop Switch, Power) Pc 50 252.00 12,600.00 53 Long Nose Pliers, 8" Pc 50 200.00 10,000.00 54 Multimeter, Digital (auto Range/data Hold/back Light/ Led Lamp/diode Test/triode Test/continuity/ Overload Protection/low Battery Indication/auto Power Off/short-circuit Protection. Display: True Rms, 6000 Counts, 3 5/6 Digits Overload Display: Display Ol Dc Voltage:600mv/6v/60v/600v(0.5%+3), 1000v (0.5%+3) Ac Voltage:600mv/6v/60v/600v/750v (0.8%+5) Dc Current:600a/6000a/60ma/600ma/10a (1.2%+3) Ac Current:600a/6000a/60ma/600ma/10a (1.5%+3) Resistance:600/6k/60k/600k/(1.0%+3) ,6m/60m (1.5%+3) Capacitance: 10nf/100nf/1000nf/10uf/100uf/1000uf (4.0%+5), 10mf/100mf(5.0%+5 Pc 40 800.00 32,000.00 55 Patch Panel (48 Ports) Cat6 Cable Material: Abs Plastic Application: Utp(unshielded) Certification: Rohs, Iso, Ce Rj45 Connector: Two Rows (1-24 Ports & 25-48 Ports) Transport Package: 1pcs/box Pc 50 2,500.00 125,000.00 56 Pc Video Camera (5.0 Mega Pixel Web Camera, Usb-type; With Microphone For Laptop And Desktop Pc Use; Resolution: At Least 640 X 480; Support Windows Xp/7/8/equivalent Mac Os Or Later Versions) Pc 20 500.00 10,000.00 57 Phillip’s Screwdriver, 8" Insulated Pc 50 250.00 12,500.00 58 Precision Screwdriver Set (1 Set Comes With The Following: 3 X Phillips Tip No. 00, 0, And 1; 6 X Standard Tip No. 1, 1.2, 1.4, 1.8, 2.4, And 3.0; 1 X Awl; 1 X Magnet; Plastic Storage Case;) Set 50 500.00 25,000.00 59 Soldering Iron, 60w Pc 50 250.00 12,500.00 60 Standard Screwdriver (flat), 8” Insulated Pc 50 250.00 12,500.00 61 Uninterruptible Power Supply (ups) Battery (included): Lithium-ion Battery Or Maintenance-free Sealed Lead-acid Battery With Suspended Electrolyte: Leakproof Voltage: Nominal Input Voltage: 230v, 50/60hz Output Power Capacity: 600va (minimum) Pc 40 4,000.00 160,000.00 62 Usb External Hd 1tb Pc 10 3,500.00 35,000.00 63 Wire Stripper (10 Awg To 24 Awg Length: 7 Inches (minimum) Pc 54 250.00 13,500.00 64 Wireless Access Point ( Access Point Dual Band Wi-fi Band / Data Transfer Rate: 867 Mbps At 5 Ghz And 300 Mbps At 2.4ghz Band Operating Modes: Access Point (ap), Bridge, Wireless Client, Repeater Interface: One 10/100m Ethernet Port(rj45), Support Passive Poe Power On/off Button And Reset Button Comes With External Power Supply: 5vdc-12vdc / 0.5a-1.0a Dimensions ( L X W X D ): (76-191 ×47-125 ×30-68mm) Pc 50 1,500.00 75,000.00 Subtotal 802,202.00 Tvl Tools & Equipment (cookery) 65 Apple Corer (material: Stainless Steel Total Length: 18 Cm (minimum) Handle Material: Hard Plastic, Polypropylene Handle Dimension: Length-10 Cm X Diameter-2 Cm (minimum) Blade Size: Length-8cm X Diameter-2 Cm (minimum) Pc 10 444.00 4,440.00 66 Bain Marie, Table ( Type: Bain Marie Table (food Warmer) Body Shape: Rectangular Material: 304 Stainless Steel, 0.8 Mm Thick (minimum) Dimensions: Length-1500 Mm X Width-700mm X Height-800 Mm (minimum) Power Source: Voltage: 220 Volts - 230 Volts, 50 Hz/ 60hz With Royal Cord 1.5 Meter Long With Attachment Standard Type A Male Plug Or Provide Plug Adopter 10a/220v) Pc 4 20,700.00 82,800.00 67 Blender, Electric (material Housing: Plastic (polypropylene) Jar Height: 25 Cm To 28 Cm Jar Thickness: 4 Mm To 8 Mm Heat Resistant Glass Jar With Cover Source Voltage: 220volts/ 240volts, 50hz/ 60hz With Power Cord 1.5 Meter Long With Attachment Of Standard Type A Male Plug Or Provide Plug Adopter 10a/220v. Power Wattage: 300 To 700 Watts Blade: Stainless Steel, 3 To 4 Metal Blades) Pc 4 2,875.00 11,500.00 68 Board, Chopping/cutting, Plastic (board Size: Length: 15 Inches (minimum) Width: 12 Inches (minimum) Thickness: 0.5 Inch (minimum) Pc 20 289.00 5,780.00 69 Boiler, Double (stainless Steel Thickness: 1/16 Inch (1.5 Mm) (minimum) Lid Material: Glass Riveted Handle On Both Sides Diameter: 9 1/2 Inches (minimum) Total Height: 9.4 Inches (minimum) Inset Bottom Diameter: 9 Inches (minimum) Inset Top Diameter: 9 Inches (minimum) Capacity: 3 Liters (minimum) Pc 2 2,128.00 4,256.00 70 Braising Pan, Medium Pc 10 1,494.00 14,940.00 71 Can Opener (stainless Steel Dimension: Length-21 Cm X Width 10 Cm X Depth:2.5cm (minimum) Pc 4 242.00 968.00 72 Casserole, Medium Pc 10 702.00 7,020.00 73 Casserole, Small Pc 12 669.00 8,028.00 74 Colander, Medium Pc 10 340.00 3,400.00 75 Colander, Small Pc 10 303.00 3,030.00 76 Cup, Measuring (for Solid) (cup, 1/2 Cup, 1/3 Cup, 1/4 Cup And 1/8 Cup.) Set 10 518.00 5,180.00 77 Dispenser, Paper Towel (abs Plastic Dimensions: Length =260 Mm X Width =100 Mm X Height = 211 Mm (minimum) Capacity: 200 Paper Paper Size: Length-20 Cm X Width- 8 Cm (approximate) Pc 10 403.00 4,030.00 78 Stand Fan, Electric (metal, Plastic Size/diameter: 18 Inches Power Rating: 70 Watts (minimum), 220/240 Vac, 50 / 60 Hz, Single Phase Rotation Angle: 90 Degrees Base: Stable, 16 Inches Diameter (approx.) Pc 5 1,495.00 7,475.00 79 Fire Extinguisher (with Contents) Capacity 5 - 6 Kgs Rechargeable Cylinder Metal Working Pressure Of Cylinder: 400 Psi Pc 1 2,875.00 2,875.00 80 Fish Poacher, Medium (oval Pot For Poaching Material: Stainless Steel, 0.64 Mm Thick Dimensions (l X W X D): 45 Cm X 15 Cm X 12cm (minimum) Handle Material: Stainless Steel Riveted Looped Handles On Both Side, 7 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm) Pc 10 2,076.00 20,760.00 81 Fork, Carving (square Shape Prong Prong Material: High Carbon Stainless Steel Overall Length: 30 Cm (minimum) Blade Dimension: Length- 15 Cm X Width- 0.5 Cm X Thickness- 0.3 Cm (minimum) Number Of Prongs: 2 Prongs Comes With Square - Shaped Prongs And Pointed Tips Abs Plastic Triple-riveted Handle) Pc 10 593.00 5,930.00 82 Fork, Kitchen (body Shape: Standard Material: Stainless Steel Dimension: Length - 32 Cm X Width- 3.5 Cm (minimum) Fork Size: Length: 8 Cm X Width -3.5 Cm (minimum) Handle: Abs Plastic Number Of Tines: 2 Tines With Tapered End Pc 10 248.00 2,480.00 83 Frying Pan, Large Pc 10 438.00 4,380.00 84 Frying Pan, Medium Pc 10 334.00 3,340.00 85 Frying Pan, Small Pc 12 296.00 3,552.00 86 Funnel, S/s, Medium Pc 10 242.00 2,420.00 87 Funnel, S/s, Small Pc 10 207.00 2,070.00 88 Garbage Bin (material: Hard Plastic, Polypropylene Dimension: Diameter-26 Cm X Height-47 Cm (minimum) Capacity: 4 Gallons (minimum) Removable Dome Shape Lid With Spring Return Swivel) Pc 4 863.00 3,452.00 89 Glass Rack (body Shape: Square Material: Polypropylene Plastic Overall Dimensions: Length - 19 1/2 Inches X Width - 19 1/2 Inches X Height - 4 Inches (minimum) Compartments: Full-size 25 Individual Compartment Glass Rack Compartment Dimensions: Length - 3 ½ Inches X Width - 3 1/2 Inches X Height - 4 Inches (minimum) Easy Grip Handles Molded Into All Four Sides Preferably With A Packing Case) Pc 12 817.00 9,804.00 90 Ice Cream Scooper (medium) Pc 2 288.00 576.00 91 Knife, Boning (28 Cm (minimum) Blade: Length-15 Cm X Width- 3 Cm (minimum), Pointed Tip Cutting Edge Angle From Tip To The Heel Is 13 To 14 Degrees Handle Length: 12 Cm (minimum) Handle Material: Hard Plastic Handle With Rivets) Pc 10 564.00 5,640.00 92 Knife, Chef (chef's Knife Body Shape: Flat Materials: Stainless Steel Overall Length: 30 Cm (minimum) Blade Size: Length - 20 Cm X Width-4 Cm (minimum) Blade Thickness: 2.5 Mm (minimum) Pc 10 449.00 4,490.00 93 Knife, Cleaver (forged Stainless Steel Heavy Duty Blade Length: 17 Cm (minimum) Overall Length: 30 Cm (minimum Cutting Edge: Straight Handle Material: Ergonomic Wood Handle With Triple Rivets) Pc 10 552.00 5,520.00 94 Knife, Oyster (stainless Steel Blade Dimension: Length - 7 Cm (minimum) X Width - 2 Cm (minimum) Blade Thickness: 2 Mm (minimum) Handle Material: Smooth Wooded Handle Rounded Handle Size: Length-10 Cm X Diameter- 3.5 Cm (minimum) Total Length (from The Tip Of The Handle Up To Tip Of The Blade) :17 Cm (minimum) Pc 10 547.00 5,470.00 95 Light, Emergency (metal, Anti-rust Coated Duration Time (2 Heads): 5 Hours (minimum) Automatically Light Up During Power Outage Overcharge And Over- Discharge Protection Built - In Ac Charger, Power Cord Plug To Adapt Type A Outlet (or Providing 5a Minimum Plug Adapter Is An Option) Battery Test Switch - External Safety Fuse Head: White Led 1w (minimum) 3.5 " Dome Reflector ) Pc 1 2,013.00 2,013.00 96 Meat Slicer (die Cast Aluminum Alloy And Body Painted Dimensions: Width-40.5 Cm X Depth- 45.7 Cm X Height- 38 Cm (minimum) Stainless Steel Rotary Blade Diameter: 190 Mm (minimum) Power Source: 220 Volts-230 Volts, 60 Hz With Power Cord 1.5 Meter Long With Attachment Of Standard Type A Male Plug Or Provide Plug Adopter 10a/220v) Pc 10 3,220.00 32,200.00 97 Pastry Tube (standard) Pc 10 633.00 6,330.00 98 Peeler, Y-type (stainless Steel Overall Dimensions (l X W X H): 7 Inches X 2 1/4 Inches X 1 Inch (minimum) Blade Material: 304 Stainless Steel, 0.7 Mm Head Dimension: (l X W X H) 2 1/4 Inches X 2 1/4 Inches X 1 Inch (minimum) Pc 10 275.00 2,750.00 99 Pepper And Salt Mill (round Body Material: Wood Size: Diameter: 5 Cm X Height: 20 Cm (minimum) Carved Of Wood With Stainless Steel Grinding Mechanism Color: Natural Screw Cap At The Top Of The Mill To Adjust The Thickness Of Peeper Or Spices) Pc 10 1,380.00 13,800.00 100 Piping Bag (transparent Disposable Plastic For Dispensing Ingredients To Pastries Length: 9 Inches Minimum Width: 3 Inches (minimum) Volume: 500 Ml (approximate) Pc 10 242.00 2,420.00 101 Plate Rack (body Shape: Rectangular Material: 304 Stainless Steel Dimension: Length-475 Mm X Width- 290 Mm X Height- 380 Mm (minimum) Pc 12 2,099.00 25,188.00 102 Preparation Table With Sink (stainless Steel, 1 Mm Thick (minimum) Dimensions: L-1200 Mm X W - 700 Mm X H - 850 Mm (minimum) Stainless Steel Tabletop And Stainless Steel Under Shelf Fully Welded Construction Sink: Left Side Single Bowl Sink With Drainer 4 Inches & Faucet Provision Sink Dimension (l X W X D) 400 Mm X 500 Mmx 25 Mm (minimum) Pc 10 4,485.00 44,850.00 103 Pressure Cooker (polished Aluminum Dimension: Diameter: 32 Cm X Height: 25 Cm (minimum) Capacity: 10 Quarts (11.3 Liters) Side Handles For Secure Carrying Equipped With Safety Opening Mechanism, Spring Safety Valve, Rubber Seal Ring) Pc 2 5,520.00 11,040.00 104 Roasting Pan (medium) Pc 10 1,840.00 18,400.00 105 Scissor, Kitchen (body Shape: Ergonomic Blade Material: Stainless Steel, 2 Mm Thick Handle Material Heavy Duty Acrylonitrile Butadiene Styrene (abs) Plastic Overall Length: 20 Cm (minimum) Width: 7.5 Cm (minimum) Pc 10 448.00 4,480.00 106 Siever, Small (stainless Steel Diameter: 20 Cm (minimum) Depth: 7 Cm (minimum) Twin Wire Handle: Length 20 Cm X 5 Mm Diameter (minimum) Fine Mesh: 0.7 Mm (1/32 Inch) (minimum) Pc 10 677.00 6,770.00 107 Skimmer, Fine (stainless Steel, Polished Overall Length: 34 Cm (minimum) Skimmer Head: Diameter -10 Cm X Depth- 4 Cm (minimum) Diameter Of Holes: 2 Mm (approx.) Handle: Length- 12 Cm X Diameter- 2 Cm (minimum) Pc 10 758.00 7,580.00 108 Skimmer, Spider (stainless Steel, Polished Overall Length: 35 Cm (minimum) Skimmer Head Diameter: 15 Cm X Depth 4 Cm(minimum) Handle Length: 12 Cm X 2 Cm Diameter (minimum) Pc 10 472.00 4,720.00 109 Soup Cup Rack (polypropylene Plastic Dimension: Length: 50 Cm X Width: 50 Cm X Height: 10 Cm (minimum) Compartment Length: 11 Cm Compartment Width: 11 Cm Compartment /inside Height: 6.7 Cm) Pc 12 1,553.00 18,636.00 110 Soup Ladle, 12 Oz Pc 10 472.00 4,720.00 111 Soup Ladle, 3 Oz Pc 10 300.00 3,000.00 112 Soup Ladle, 6 Oz Pc 10 403.00 4,030.00 113 Soup Ladle, 8 Oz Pc 10 455.00 4,550.00 114 Spatula (stainless Steel 316 Handle Material: Hardwood (smooth Finish) With Rivets Blade Dimension: Length= 7 .5 Inches X Width-1.5 Inches (minimum) Thickness Of Blade: 1.7 Mm Thick (minimum) Total Length = 12 To 14 Inches) Pc 8 294.00 2,352.00 115 Spoon, Kitchen (stainless Steel, 1.5 Mm Thick Overall Length: 30.5 Cm X Width-7.5 Cm (minimum) Spoon Head Dimension (l X W) 9 Cm X 7.5 Cm (minimum) Handle: Abs Plastic Spoon Head: Oval Type) Pc 8 403.00 3,224.00 116 Spoon, Kitchen (slotted) Oval With Slot Material: Stainless Steel, 1.5 Mm Thick Overall Length: 30.5 Cm X Width-7.5 Cm (minimum) Spoon Head Dimension (l X W) 9 Cm X 7.5 Cm (minimum) Handle: Abs Plastic Spoon Head: Oval Type With Slot At Least 6 Rectangular Slots Preferably With A Packing Case Heat Resistant Up To 220 ° C Pc 8 386.00 3,088.00 117 Spoon, Measuring (body Shape: Bowl In Shape Material: Stainless Steel, 0.7 Mm Thick (minimum) The Set Consists Of The Following Sizes: 1 Pc - 1 Tbsp. (15 Ml) 1 Pc - 1/2 Tbsp. (7.5 Ml) 1 Pc - 1 Tsp. (5 Ml) 1 Pc - 1/2 Tsp. (2.5 Ml) Set 8 291.00 2,328.00 118 Spoon, Parisienne Stainless Steel, Polished Overall Length: 240 Mm (minimum) Scoop Diameter: 30 Mm And 24mm (minimum) With Plastic Handle (polypropylene), Size: 130 Mm X Width-20 Mm (minimum) Pc 8 301.00 2,408.00 119 Spoon, Serving (stainless Steel Dimension: Length: 23 Cm X Width: 5 Cm (minimum) Scoop Dimension (l X W X D): 7 Cm X 5 Cm X 0.9 Cm (minimum) Spoon Thickness: 1.6 Mm (minimum) Pc 24 365.00 8,760.00 120 Spoon, Wooden Hardwood Dimensions: Length- 10 Inches X Width- 2 Inches (minimum) Bowl Dimension: Length -3 Inches X Width 2 Inches X Depth -3/4 Inches (minimum) Total Length: 10 Inches (minimum) Pc 8 92.00 736.00 121 Stock Pot, Large (stainless Steel, 0.8 Mm Thick (minimum) Top Diameter: 30 Cm (minimum) Height: 31 Cm (minimum) Capacity: 20 Quarts (22.7 Liters) Oven Safe To 350⁰f And Dishwasher Safe. Pc 5 2,703.00 13,515.00 122 Strainer Chinois, Small Stainless Steel Strainer Diameter: 20 Cm (minimum) Strainer Depth: 21.5 Cm (minimum) Handle Length: 20 Cm (minimum) With 2 Mm. (approx.) Fine Mesh Handle Has Provision For Hanging Preferably With A Packing Case Pc 5 380.00 1,900.00 123 Strainer Chinois, Medium (stainless Steel Strainer Diameter: 14 Cm (minimum) Strainer Depth: 13 Cm (minimum) Handle Length: 15 Cm (minimum) With 1 Mm (approx.) Fine Mesh Handle Has Provision For Hanging Pc 5 420.00 2,100.00 124 Strainer Medium, Fine Stainless Steel Strainer Diameter: 20 Cm (minimum) Strainer Depth: 7 Cm (minimum) Handle Length: 18 Cm (minimum) With 2 Mm. (approx.) Fine Mesh Strainer’s Two Layers Of Tightly Woven Mesh Catches Handle Has Provision For Hanging Pc 8 248.00 1,984.00 125 Strainer Small, Fine Stainless Steel Strainer Diameter: 13 Cm (minimum) Strainer Depth: 5 Cm (minimum) Handle Length: 13 Cm (minimum) With 1 Mm. (approx.) Fine Mesh Pc 8 240.00 1,920.00 126 Tenderizer, Medium Cast Aluminum Overall Length: 26 Cm (minimum) Dual-sided Hammer, Square Head: 6 Cm X 6 Cm (minimum) Ridged Surface With Rows Of Dull, Pyramid-shaped Spikes Weight: 250 Grams To 500 Grams Pc 8 559.00 4,472.00 127 Thermometer, Pocket /pin Tubular Pen Style Digital Thermometer Product Size: 100 Mm X 40 Mm X 14 Mm (minimum) Display Size: 40 Mm X 20 Mm (minimum) Prove Length: 200 Mm (minimum) Measuring Range: -50 °c To 300 °c (-58 ⁰f To 372 ⁰f) Resolution: 0.1 °c / 0.2 °f Pc 10 880.00 8,800.00 128 Tong, 12 Inches Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Pc 10 322.00 3,220.00 129 Tong, 8 Inches Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Tongs Lock Closed For Storage Preferably With A Packing Case Pc 10 291.00 2,910.00 130 Tray, Baking, Small Rectangular Material: Stainless Steel Dimension: 20 Cm X 30 Cm X 3.7 Cm (minimum) Body Thickness: 0.7- 1.0 Mm Pc 10 548.00 5,480.00 131 Tray, Utility Rectangular Material: Stainless Steel Dimension: Length- 48 Cm X Width-32 Cm X Height-2.5 Cm (minimum) Reinforced Edges Pc 12 644.00 7,728.00 132 Turner 3" X 6" Pc 10 541.00 5,410.00 133 Utility Cart Plastic, Polypropylene(pp) Dimension: (l X W X H) 84 Cm X 43 Cm X 95 Cm (minimum) Capacity: 330 Lbs (150 Kg) Loads (minimum) Three (3) Shelving With At Least 25 Cm Distance Between Shelves Tub Shelf Measure (l X W X D) 84 Cm X 43 Cm X 7 Cm (minimum) With Four (4) Swivel Caster, 10 Cm Diameter, Two Which Have Locking Brakes Pc 2 14,713.00 29,426.00 134 Weighing Scale, 1 Kg, Digital Engineering Plastic And Stainless-steel Weighing Plate Capacity: 1 Kg Accuracy: 1 Gram Back Light Lcd Display With 15 Mm Minimum High Digits Weighing Units: Gram, Ounce, Pound Size: (l X W X H Mm) 163 Mm X 245 Mm X 79 Mmm (minimum) Pc 6 1,630.00 9,780.00 135 Weighing Scale, 5 Kg Circular Bowl Material: Stainless Steel Bowl And Metal Body (coated) Mechanism Type: Spring Lever Capacity: 5 Kg /11 Lb. Sensitivity/graduated By 10 Gm Measurement Units: Gram/kilogram Manual Setting On Zero, Must Be Accurate And Durable Calibrate The Scale Using The Adjustment Knob Preferably With A Packing Case Pc 10 1,794.00 17,940.00 136 Wire Skimmer, Small Round Material: Stainless Steel, Polished Overall Length: 40 Cm (minimum) Skimmer Head Diameter: 12 Cm (minimum) Diameter Of Holes: 2 Mm (approx.) Handle Has Hole For Hanging Pc 10 408.00 4,080.00 137 Wire Whisk, Heavy Duty: Ballon Material: Heavy Duty Stainless Steel Dimensions (l X W): 31.8 Cm X 7.6 Cm (minimum) Handle Length: 12 Cm (minimum) With Hanging Loop No. Of Wires: 8 Wires Wire Diameter: 2 Mm (minimum) Pc 2 564.00 1,128.00 138 Wire Whisk, Medium Ballon Material: Stainless Steel Wire Whisk Medium Dimensions (l X W): 25.4 Cm X 7 Cm (minimum) Handle Length: 10 Cm (minimum) With Hanging Loop No. Of Wires: 6 Wires Wire Diameter: 1.8 Mm (minimum) Pc 10 488.00 4,880.00 139 Wire Whisk, Small Balloon Material: Stainless Steel Wire Whisk Medium Dimensions (l X W): 20.3 Cm X 6 Cm (minimum) Handle Length: 10 Cm (minimum) With Hanging Loop No. Of Wires: 6 Wires Wire Diameter: 1.8 Mm (minimum) Pc 10 372.00 3,720.00 140 Wok, Medium: Round Material: Carbon Steel Thickness: 1.8 Mm Thick (minimum) Dimensions (dia. X H): 45 Cm X 14 Cm (minimum) Handle Material: Steel Riveted Convenient Both Side Handle 10 Cm (minimum) With Flat Bottom Pc 10 771.00 7,710.00 141 Wok, Small Round Material: Carbon Steel Thickness: 1.5 Mm Thick (minimum) Dimensions (dia. X H): 36 Cm X 10 Cm (minimum) Handle Material: Steel Riveted Convenient Both Side Handle 8 Cm (minimum) With Flat Bottom Pc 10 679.00 6,790.00 142 Working Table Rectangular Material: 304 Stainless Steel, 1.29 Mm Thick (gauge 16) Minimum Length: 1220 Mm (minimum) Width: 700 Mm (minimum) Height: 850 Mm (minimum) Tubular Stainless Steel Legs, 38mm (minimum) With 4 Adjustable Bullet Feet Pc 5 13,628.00 68,140.00 143 Zester Standard Material: Stainless Steel Grating Surface Dimensions (l X W): 20.3 Cm X 4 Cm (minimum) Overall Length: 32.5 Cm (minimum) Handle Material: Plastic (polypropylene) Ergonomic Handle Preferably With A Packing Case Dishwasher Safe Pc 10 397.00 3,970.00 Sub Total 702,982.00 Tvl Tools & Equipment (food And Beverages Services) 144 Chair, Dining Side Chair Body Shape: Square Material : Metal (round Or Square) Dimension: Total Height - 33" X 15" X15" (minimum) Capacity: 150 Kg. Black Colored Powder Coated Frame With Foam On Seat Packed In Carton Box Pc 50 1,955.00 97,750.00 145 Coffee Pot, 2 Pints Round Material: Stainless Steel With Cover Capacity: 2 Pints Outside Diameter: 90 -110 Mm Over-all Height: 200 - 230 Mm Thickness: 0.5 - 1 Mm Pc 4 1,139.00 4,556.00 146 Container, Creamer Porcelain With Spout Body Shape: Circular Material: Porcelain Diameter: 50 - 65 Mm Height: 80 - 105 Mm Color: White Pc 10 288.00 2,880.00 147 Cups And Saucers 5-6 Oz. 1. Material: Porcelain 2. Capacity: 5 Oz./140 Ml 3. Heatproof Up To 300 Deg. C 4. Color: White 5. The Item Must Be Of Good Quality Packed In Carton Box Pc 24 403.00 9,672.00 148 Fork, Cocktail Material/appearance: Stainless Steel, Highly Polished, W/ Plain Design Type: Rounded Tip Handle Over-all Length: 110 - 165 Mm Width: 20 - 30 Mm (minimum) Handle Thickness: 2 Mm To 4 Mm Handle Length: 75 - 90 Mm Small, Colo: Silver The Item Must Be Branded And Have Good Quality. Pc 24 173.00 4,152.00 149 Fork, Dessert Fork Body Shape: Fork Shape, Round Tip Material/appearance: Stainless Steel, Highly Polished, With Plain Design, Rounded Tip Handle Length: 150 Mm - 175 Mm Width: 20 – 30mm Handle Thickness: 1.5mm - 3 Mm Number Of Tines: 4 Handle: 130 Mm (minimum) Color: Silver Pc 24 173.00 4,152.00 150 Fork, Dinner Fork Body Shape: Fork Shape Material / Appearance: Stainless Steel, Highly Polished, With 4tines Over - All Length: 120 - 175 Mm Thickness Of Handle: 2 - 3 Mm Color: Silver Packed In Plastic Pouch The Item Must Be Of Good Quality Pc 24 196.00 4,704.00 151 Fork, Fish Fork Body Shape: Fork Shape With Round Tip Material / Appearance: Stainless Steel, Highly Polished, With Plain Design Over-all Length: 180 - 215 Mm Fork Width: 1.5 Mm - 3 Mm Fork Thickness: 1 Mm - 2 Mm Number Of Tines: 4 Length Handle: 120 - 130 Mm Handle Thickness: 2 Mm - 3 Mm Color: Silver Packed In Plastic Pouch Pc 24 288.00 6,912.00 152 Fork, Oyster (4 To 5-1/2 Inches In Overall Length.) Pc 24 173.00 4,152.00 153 Glass, Champagne Flute Oyster Fork Body Shape: Fork Shape Material: Stainless Steel, With High Polish Appearance, And With Plain Design Length: 90 - 120 Mm Thickness: 1 Mm - 3 Mm Silver Color With Three Short Wide Curved Tines Pc 24 288.00 6,912.00 154 Glass, Collins Tumbler Body Shape: Round Material: Clear Glass Capacity: 10 Oz To 14 Oz Thickness: 1.5 -3 Mm (minimum) Packed In Carton Box Pc 24 173.00 4,152.00 155 Glass, Juice / Hi- Ball Material: Clear Glass Type: Hi-ball Height: 140 - 160 Mm Bottom Diameter: 50 -70 Mm Top Diameter: 50 - 70 Mm Thickness: 2 - 4 (minimum) Capacity: 8 Oz. To 10 Oz. Dishwasher Safe The Item Must Be Branded And Good Quality Pc 24 518.00 12,432.00 156 Glass, Pilsner (iced Tea Glass) Type: Flared Rim Body Shape: Round Slender Material: Clear Glass Capacity: 20 Oz. To 23 Oz. Over-all Length: 22 -25 Cm Thickness Of Glass: 1 -3 Mm With Flared Rim And Slender Shape Packed In Carton Box The Item Must Have Good Quality Pc 24 288.00 6,912.00 157 Glass, Red Wine Balloon Shaped Bowl Material: Crystal Clear Glass Rim Diameter: 55 - 60 Mm Thickness: 1.5 Mm - 3 Mm Over - All Length : 200 -220 Mm Capacity: 250 -300 Ml Stem Diameter: 6 - 8 Mm Stem Length: 85 - 90 Mm Base Diameter: 75 - 85 Mm Base Thickness: 2 - 4 Mm Pc 24 403.00 9,672.00 158 Glass, White Wine Balloon Shaped Bowl Material: Crystal Clear Glass Rim Diameter: 55 - 60 Mm Thickness: 1.5 - 3 Mm Over -all Length: 200 -220 Mm Capacity: 270 - 300 Ml Stem Diameter: 6 - 8 Mm Stem Length: 75 - 85 Mm Base Diameter: 70 - 80 Mm Base Thickness: 2 - 5 Mm Pc 24 443.00 10,632.00 159 Gravy Boats Boat Shape With Handle Material: Stainless Steel Capacity: 5 Oz. Appearance: Mirror Polish Finish Size :17cm X 7.3cm X 8.2 Cm / 6.7 X 2.9 X 3.2 Inches (minimum) The Item Must Have Good Quality Pc 4 225.00 900.00 160 Ice Bucket, 2 Liters With Tongs Circular Set Includes: Ice Bucket Material: Stainless Steel Diameter: 140 - 180 Mm Height: 140 - 170 Mm Thickness Of Bucket : 0.7 - 2 Mm Capacity: 2 Liters (minimum) Pc 5 471.00 2,355.00 161 Knife, Butter Stainless Steel W/ Highly Polished Appearance Over-all Length: 140 Mm - 150 Mm Handle Thickness: 3 Mm - 5 Mm With Dull Edge And Rounded Tip Pc 24 127.00 3,048.00 162 Knife, Dinner Flat With Round Tip Material / Appearance: Stainless Steel Blade Highly Polished Handle Material: Stainless Steel Overall Length: 160 - 190 Mm Blade Thickness: 2 - 4 Mm Handle Thickness: 3 - 6 Mm Pc 24 213.00 5,112.00 163 Knife, Fish Flat With Pointed Tip Material / Appearance: Stainless Steel, Highly Polished W/ Plain Design Overall Length: 200 - 220 Mm Width Blade: 20 - 25 Mm Thickness Of Blade: 2 Mm - 4 Mm Thickness Of Handle: 3 Mm - 6 Mm Pc 24 207.00 4,968.00 164 Menu Folder (a4 (297mm X 210 Mm) And A5 (210 Mm X 148 Mm) Pc 5 518.00 2,590.00 165 Napkin Holder Rectangular Material: Stainless Steel With Highly Polished Appearance Dimension: Width: 70 - 90 Mm X Length: 150 - 170 Mm Thickness: 0.7 Mm -2 Mm Packed In Plastic Pouch Pc 6 247.00 1,482.00 166 Order Pads Rectangular Material: 80gsm Offset Paper Each Pad Comes With A 100 Sheets And Corresponding Copy Page Each Pad Has Sequentially Numbered Orders To Make It Easy To Keep Track With 100 Sheets Per Pad And 10 Pads Included Pc 5 58.00 290.00 167 Pepper And Salt Mill: Round Body Material: Wood Size: Diameter: 5 Cm X Height: 20 Cm (minimum) Carved Of Wood With Stainless Steel Grinding Mechanism Color: Natural Pc 20 1,380.00 27,600.00 168 Plate Covers Circular Material: Stainless Steel, Mirror Polished Diameter: 10 1/4 Inches (minimum) Height: 2 7/8 Inches (minimum) Thickness: 1/16 Inch. (minimum) With Handle Pc 8 305.00 2,440.00 169 Plate, Dessert, 7”to 8” Circular Material: Porcelain Supply Must Be A Set, Consisting Of One (1) Of Each: 7 Inches And 8 Inches Plates Color: White Inner Diameter: 145 To 165 Mm Thickness: 3 To 6 Mm Pc 24 207.00 4,968.00 170 Plate, Dinner, 10” Circular Material: Porcelain With No Design Color: White Inner Diameter: 200 Mm - 215 Mm Outer Diameter: 250 - 260 Mm Thickness: 3 Mm - 6 Mm Pc 24 437.00 10,488.00 171 Plate, Fish, 8” To 9” Circular Material: Porcelain With No Design Supply Shall Be A Set Consisting Of: One (1) Each 8 Inches And One (1) Each, 9 Inches Color: White Inner Diameter: 165 Mm - 190 Mm(minimum) Thickness: 3 Mm - 6 Mm Pc 24 207.00 4,968.00 172 Round Table (8's) (54” Or 60”) Pc 10 9,034.00 90,340.00 173 Salad Forks (6” Long) Pc 24 127.00 3,048.00 174 Salad Knife 8” Pc 24 207.00 4,968.00 175 Salad Plates 7” To 8” Pc 24 242.00 5,808.00 176 Salt And Pepper Shakers Square Material: Glass And Aluminum Over-all Height: 75 -90 Mm Length: 50 -60 Mm Width: 50 -60 Mm Pc 4 207.00 828.00 177 Sauce Ladles Circular With Pouring Spout Material: Stainless Steel, Highly Polished Appearance Over-all Length: 220 -230 Mm Ladle Bowl Length: 60 -65 Mm Long Ladle Bowl Diameter: 65 -70 Mm Depth: 10 -15 Mm Handle Details: 150-155 Mm Long X 20 -30 Mm Wide X 2 - 4 Mm Thick Pc 10 403.00 4,030.00 178 Server, Cake Stainless Steel Blade, Highly Polished Appearance 2. Over-all Length: 220 To 270 Mm 3. Width: 60 - 80 Mm 4. Thickness: 1.5 Mm To 2 Mm 5. Handle: 120 -140 Mm Long, Non-toxic Plastic 6. Shape: Shovel-shaped 7. Color: Silver Pc 10 571.00 5,710.00 179 Service Forks : Fork Shape Material/appearance: Stainless Steel, Highly Polished, W/ Palin Design Over-all Length: 220 Mm - 260 Mm Width: 20 - 25mm Handle Thickness: 1.5 Mm - 4 Mm Handle Length - 165 Mm - 185 Mm 4 Tines Color: Silver Pc 6 207.00 1,242.00 180 Service Tray: Rectangular Material: Plastic (pp) Size: 14 Inches X 18 Inches X 1 Inch (minimum) Colo: Any Pc 6 518.00 3,108.00 181 Show/service/ Base Plates 11” To 14” Round Material: Porcelain With No Design Supply Must Be A Set Consisting (1) Of Each: - 11 Inches, - 12 Inches, - 13 Inches, And - 14 Inches Plates Color: White Diameter, Inner : 225 Mm - 250 Mm Thickness: 3 Mm - 6 Mm Set 6 1,208.00 7,248.00 182 Side Plates Or Bread Plates 6” Round Material: Porcelain With No Design Color: White Inner Diameter: 95 Mm To 120 Mm Outer Diameter: 145 Mm To 170 Mm Thickness: 3 Mm - 6mm Pc 24 242.00 5,808.00 183 Side Towels Rectangular Material: Oxford Polyester Soft Cloth Over-all Length: 640 - 680 Mm Over-all Width: 420 -460 Mm Color: Plain White Pc 10 349.00 3,490.00 184 Silver Platter Round Material: Stainless Steel Diameter: 300 -330 Mm Thickness: 1 - 2 Mm Pc 10 570.00 5,700.00 185 Soup Bowl Circular Material: Porcelain Capacity: 24 Oz. (minimum) Pc 24 437.00 10,488.00 186 Soup Ladle Circular Material: Stainless Steel, Highly Polished Appearance Over-all Length: 220 -235 Mm Ladle Bowl Details: 60 -65 Mm Long, 60 -75 Mm Diameter, 10 -15 Mm Deep Pc 10 366.00 3,660.00 187 Soup Tureen Round Material: Stainless Steel Capacity: 7 - 11 Quart Size: 60 X 35 X 32 Cm (minimum) Pc 10 695.00 6,950.00 188 Spoon, Dessert Oval Material/appearance: Stainless Steel, Highly Polished With Plain Design Over-all Length: 175 To 190 Mm Thickness: 2 Mm - 3 Mm Shorter Handle: 120 -130 Mm Color: Silver Pc 24 125.00 3,000.00 189 Spoons, Service Oval Material: Stainless Steel, Highly Polished, W/ Plain Design Over-all Length: 220 Mm - 250 Mm Width: 30 - 38 Mm Handle Thickness: 1.5 Mm - 4 Mm Handle Length - 165 Mm - 185 Mm Color: Silver Pc 6 136.00 816.00 190 Spoons, Soup (cream And Consume) Round Material/appearance: Stainless Steel, Highly Polished, W/ Plain Design, Rounded Tip Handle Over-all Length: 165 Mm - 200 Mm Smaller Oval Shaped Spoon Bowl And Tapers Slightly To The Tip Pc 24 160.00 3,840.00 191 Steak Knife (5”) Pc 24 251.00 6,024.00 192 Sugar Container Round Material: Glass With Brass Lid (or Equivalent) Diameter: 70 -80 Mm Height: 130 -140 Mm Capacity: 12 Oz. Pc 10 288.00 2,880.00 193 Tablecloth, 54 X 54 Inches Rectangle Material: Linen Color: Any Color But Not Black Feature: Washable Pc 10 942.00 9,420.00 194 Tablecloth, 64x64 Inches Rectangular Rectangle Material: Linen Color: Any Color But Not Black Feature: Washable Pc 10 1,208.00 12,080.00 195 Table Napkins, Cloth, 16” X 16” Plain Cloth Body Shape: Square Material: Oxford Polyester Cloth Or Its Equivalent Color: Plain White Pc 60 424.00 25,440.00 196 Table Skirting Cloth Square Material: American Cotton Twill Cloth Color: Any Color Except Black Dimension: 90 Inches X 90 Inches (minimum) Packed In Plastic Pouch Pc 10 2,185.00 21,850.00 197 Table, Square/rectangular (4's Or 6's) Square/rectangle Materia: High Density Polyethylene Tabletop Powder Coated Steel Frame Dimension: 37 - 39 X 37 - 39 Inches Color: White Pc 4 5,382.00 21,528.00 198 Tea Pot, 2 Pints Porcelain Type Body Shape: Round With Handle And Pouring Spout Material: Porcelain Capacity: (2 Pint) Color: White Pc 10 1,139.00 11,390.00 199 Teaspoon Tea Spoon Body Shape: Oval Tip Material/appearance: Stainless Steel, Highly Polished, W/ Plain Design Over-all Length: 120 Mm To 140 Mm Handle Thickness: 2 Mm To 4 Mm Short Handle Length - 100 Mm (minimum) Color: Silver Pc 24 92.00 2,208.00 200 Tong, 8 Inches Standard Material: Stainless Steel Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Pc 7 291.00 2,037.00 201 Tooth Pick Holder Round Material: Stainless Steel, Highly Polished In Appearance Diameter: 30 -35 Mm Diameter (minimum) Height: 65 -75 Mm Capacity: 1.24 Oz. (minimum) Packed In Plastic Pouch Pc 10 101.00 1,010.00 202 Tray Stand Rectangular Material: Chrome Plated Metal Folding Tray Stand Length: 470 -490 Mm Width: 400 -440 Mm Height: 770 -790 Mm Pc 5 2,282.00 11,410.00 203 Tray, Bill Folders/ Change Height: 190 - 220 Mm 3. Width: 120 -140 Mm 4. Thickness: 2 Mm To 3 Mm (minimum) 5. Color: Black Pc 5 271.00 1,355.00 204 Tray, Round (bar) Round Material: (pe/abs) Plastic Rubberized Surface, Non-slip/grip Tight Over-all Diameter: 345 -360 Mm (minimum) Thickness: 2 - 4 Mm (minimum) Color: Black Pc 8 443.00 3,544.00 205 Water Goblet Balloon-shaped Bowl Material: Crystal Clear Glass Over-all Length: 200 -220 Mm Capacity: 270 Ml To 300 Ml Rim Diameter - 55 -65 Mm Thickness: 1 Mm To 3 Mm Stem Length : 75 -85 Mm Stem Diameter : 6 -8 Mm Base Thickness : 3 -4 Mm Base Diameter : 7 -80 Mm Pc 24 124.00 2,976.00 206 Water Pitcher Stainless Steel, Highly Polished Appearance Height: 170 Mm To 220 Mm Top Diameter: 110 -120 Mm (approximate) Capacity: 1 - 1.5 Liter With Pour Spout Pc 10 516.00 5,160.00 Sub Total 571,245.00 Total Amount 2,336,280.00 2. The Department Of Education, Schools Division Of Ilocos Sur Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required Within Thirty (30) Calendar Days. Bidders Must Have Completed, Within 10 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criteria As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Deped, Schools Division Of Ilocos Sur, And Inspect The Bidding Documents At The Address Given Below From 8:00 A.m. Until 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 22-december 10, 2024 (until 9:00 A.m.) From The Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb Amounting To Five Thousand Pesos (p5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. 6. The Deped, Schools Division Of Ilocos Sur Will Hold A Pre-bid Conference On November 29, 2024, At 10:00 A.m. At The Schools Division Office, Bantay, Ilocos Sur, And/or Through Videoconferencing/webcasting Via Google Meet Using The Link: Https://meet.google.com/tjb-zntu-yys Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below, On Or Before December 12, 2024, 9:00 A.m. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On December 12, 2024, At 9:01 A.m. At The Given Address Below And/or Through And/or Virtual. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Deped, Schools Division Of Ilocos Sur Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Before Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Marillac D. Quinsaat Head – Bac Secretariat Department Of Education, Schools Division Of Ilocos Sur Zone V, Bantay, Ilocos Sur, 2727 Email Address: Ilocos.sur@deped.gov.ph 12. You May Visit The Website/s: For Downloading Of Bidding Documents: Depedilocossur.info Date Of Issue: November 22, 2024 Joye D. Madalipay, Ceso Vi Chairperson, Bids And Awards Committee
Closing Date11 Dec 2024
Tender AmountPHP 2.3 Million (USD 39.5 K)
6911-6920 of 6919 active Tenders