VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Software and IT Solutions...+2Electronics Equipment, Electrical and Electronics
United States
Details: This Is Not A Solicitation Announcement. This Is A Request For Information Only. This Request For Information (rfi) Is Intended For Information And Planning Purposes Only At This Time; And Shall Not Be Construed As A Solicitation Or As An Obligation On The Part Of The Department Of Veterans Affairs. Since This Is Request For Information Announcement, No Evaluation Letters And/or Results Will Be Issued To Respondents. No Solicitation Exits. Therefore, Do No Request A Copy Of A Solicitation.
this Is Not A Solicitation Announcement. This Is A Request For Information Only. This Request For Information (rfi) Is Intended For Information And Planning Purposes Only At This Time; And Shall Not Be Construed As A Solicitation Or As An Obligation On The Part Of The Department Of Veterans Affairs. Since This Is Request For Information Announcement, No Evaluation Letters And/or Results Will Be Issued To Respondents. No Solicitation Exists. Therefore, Do No Request A Copy Of A Solicitation.
the Department Of Veterans Affairs Visn 4, Network Contracting Office 4 (nco 4), Is Seeking Information And Potential Qualified/verified Businesses Capable Of Meeting Requirement And Salient Characteristics Below To Provide The Wilkes-barre Va Medical Center With Five (5) Pacs Dicom Image Importing/burning Systems.
statement Of Need
wilkes-barre Va Medical Center
x-ray Media Burners/importer
background: The Wilkes Barre Medical Center Needs Replacement Hardware For Outdated Picture Archiving And Communication System (pacs) Burners And Importing Software Utilized For X-ray Images. Current Software Is No Longer Supported Which Is Critical When Veterans Need Their Media Imported For Appointments And Media Is Requested For Legal Or Medical Purposes. Current Hardware And Software Is Unreliable And Is Constantly Down. We Do Not Have The Hardware Or Software To Support It In The Case Of A Complete Malfunction.
software Is Utilized For Importing Veterans X-ray Images Into Pacs From Outside Provider To Minimize X-ray Exposure. System Is Also Utilized To Export Images To Cd/dvd For Legal Or Veterans To Take Their X-ray Images To Outside Providers. Hardware Included With Software Is Utilized To Burn/label Cd/dvd And Scanners Are Utilized To Digitize And Import We Films Into Pacs. System Must Be Able To Index, And Merge Imported Media With Existing Patient Records On Pacs.
requirement: Request Is For Replacement Of Five (5) Pacs Media Importing System And Hardware, Three (3) Dicom Digitizing/paper Scanning Software Licenses And Onsite Training For Three (3) Technicians On Utilization Of Software And Hardware At The Time Of Installation.
salient Characteristics:
three (3) Digitizing/document Scanning Licenses.
paper Report Scanner With Multiple Page Scan
paper Scanner Must Have Both Color And Gray Scale Scanning.
digitizing Application Must Be Compatible With Vidar Digitizers.
software Should Support Dicom, Pdf, Tiff, Jpeg, Gif And All Other Formats.
five (5) Pacs Dicom Image Importing/burning Systems
software Must Be Able To Import Dicom Images From All X-ray Modalities From Cd, File Or Usb Drive.
import X-ray Media With Encryptions.
export Media With Multiple Security Lever (encrypt, Anonymous, Or Standard)
show History Burnt And Imported Media.
support Multi Import To Pacs Destinations At Once.
must Have Interactive Web Control For Import, Burn, And Scan Documents.
software Must Be Able To Run On A Enterprise Servers For Simultaneous Users Utilization From Hospital Owned Pc.
allow Use Of Third-party Hardware Such Scanners And Dvd.
must Be Able To Support Separate Accounts For Different User Authentication.
one Year Warranty
at Least One-year Warranty
media Burner With Dual Stack Autoloader
must Be Able To Create Custom Media Labels Based On Needs
media Burner Must Utilize Muti Color Cartridges To Ensure Label Reflect The Needed Color To Distinguish Disk
burner Must Have Self-cleaning Capability Of Print Heads
burner Must Have Built In Disk Completion Tray
burner Must Have Window To See Burner Internal Status
buner Must Have Two Media Burners To Allow Multi Burning.
dvd/cdr Starter Pack
starter Muti Pack Ink Cartridges
200 Paper Cdr/dvr Holders.
one-year Warranty With One For One Exchange
pc Requirements
operating System
windows 10 Pro (includes Windows 11 Pro License) English, French, Spanish
processor 12th Generation Intel Core I5-12500 (6 Cores/18mb/12t/3.0ghz To 4.6ghz/65w) Or Equivalent
- Ram 16gb (1x16gb) Ddr4 Non Ecc Memory Or Equivalent
- M.2 2230 512gb Pcie Nvme Class 35 Solid State Drive Or Equivalent
- 8x Dvd-rom 9.5mm Slimline Optical Disk Drive Or Equivalent
- Graphics Integrated
- Wired Keyboard
- Wired Mouse
- Ports
- Usb 3.1 - 5 (1 Front, 4 Rear)
- Usb 3.1 Type-c Port
- External Usb 2.0 - 4 (2 Front, 2 Rear)
- Internal Usb 2.0 1
- Rj-45 1
- Serial Port 1
- Display Port 1.2 2
- Universal Audio Jack - 1
- Line-out - 1
- 19 In Led Monitor (within 2 Inches Lesser Or Greater Than 19 Inches)
on-site Installation And Training
company Must Be Able To Install/setup Systems To Properly Import And Export X-ray Images From Pacs.
vendor To Provide Three (3) Technicians Onsite Training On Utilization Of Software And Hardware At The Time Of Installation. To Be Coordinated With Station Pacs Administrator Poc.
delivery:
all Items Must Be Fob Destination To The Following Location:
1111 East End Blvd Wilkes Barre Pa, 18711
radiology Department
attn: Amy Klush/michael Wyand
monday Friday From 8:00am 4:00pm
special Instructions:
software And Hardware Should Be Able To Import, Burn And Export Images From Pacs In Dicom Format. Burners Should Be Able To Label Requested Media With Va Approved Image (image Will Be Provided By Va) All Installation Must Be Approved By Wilkes Barre Biomed Department And Or It Department.
_____________________________________________________________________
responses To This Rfi Should Include Company Name, Address, Point Of Contact, Phone Number, And Point Of Contact E-mail, Uei Number, Cage Code, Size Of Business Pursuant To North American Industry Classification Code (naics) 334112 Computer Storage Device Manufacturing, The Small Business Size Standard For This Naics Code Is 1,250 Employees.
please Answer The Following Questions:
(1) Please Indicate The Size Status And Representations Of Your Businessâ in Accordance With The Naics Code 334112, Such As But Not Limited To: Service-disabled Veteran Owned Small Business (sdvosb), Veteran Owned Small Business (vosb),â hubzone, Woman Owned Small Business (wosb), Large Business, Etc.)
(2)â is All The Required Equipment Available On A Federal Supply Schedule Or Government Wideâ acquisition Contract?â If So, Please Include The Schedule Number.â
(3) Are You The Manufacturer, Distributor, Or An Equivalent Solution To The Items Being Referenced Above?â
if Not,â provide Additional Information Shown Below.â This Is To Confirm Compliance With The Non-manufacturer Rule Iaw 13 Cfr 121.406(b) Nonmanufacturers.â
Doesâ your Companyâ exceed 500 Employeesâ
Primarily Engaged In The Retail Or Wholesale Trade And Normally Sells The Type Of Item Being Supplied;â â â
Take Ownership Or Possession Of The Item(s) With Its Personnel, Equipment Or Facilities In A Manner Consistent With Industry Practice;â â
Provide The Items Of A Small Business
(4) If Your Company Is Aâ large Business, Do You Have Anyâ authorized Small Businessâ distributors? If So, Please Provide Their Company Name, Telephone, Point Of Contact And Size Status (if Available).â
(5) If Your Company Isâ a Small Business And You Are An Authorized Distributor/reseller For The Items Identified Above Or An Equivalent Solution, Do You Alter; Assemble; Modify; The Items Requested In Any Way? If You Do, State How And What Is Altered; Assembled; Modified?â
(6) Is The Item You Are Supplying Made Or Manufactured In America? This Is To Ensure Compliance With Far 52.225-1 Buy American-supplies.
(7) If You Intend Toâ subcontractâ any Work On This Contract, What Portion Of The Total Cost Will Be Self-performed/will Be Performed By Your Organization? Please Provide Estimated Detailed Percentage Breakdowns Related To Sub Contracted Work And Completion Of Job.â
(8) General Pricing Of Your Products/solution Is Encouraged. Pricing Will Be Used For The Purpose Of Market Research Only. It Will Not Be Used To Evaluate For Any Type Of Award.â
(9) Please Submit Your Capabilitiesâ in Regard Toâ the Salient Characteristics Detailed Above And Any Information Pertaining To Equal To Items To Establish Capabilities For Planning Purposes?â
(10) Please Review Salient Characteristics/statement Of Work (if Applicable) And Provide Feedback Or Suggestions. If None, Please Reply As N/a.â
(11) Please Provide Your Uei Number.â
*** Submissions Addressing Number (10) Should Show Clear, Compelling And Convincing*** Evidence That All Equal To Items" Meet All The Salient Characteristics.â
thisâ rfiâ will Be Conducted In Accordance With Federal Acquisition Regulation (far) Part 13. Telephone Responses Will Not Be Accepted.
responses Must Be Receivedâ via Email To Contract Specialist Olivia Osborne At Olivia.osborne@va.gov No Later Than 4:00 Pm Eastern Standard Time On January 15, 2025. This Notice Will Help The Va In Determining Available Potential Sources Only.â â do Not Contact Va Medical Center Staffâ regardingâ this Requirement, As They Are Not Authorized To Discussâ this Matterâ related To This Procurement Action.
all Firms Responding To This Request For Information Are Advised That Their Response Is Not A Request For Proposal,â therefore Will Not Be Considered For A Contract Award.â â
â
if A Solicitation Is Issued, Information Will Be Posted On Sam.gov Web Site For All Qualified Interested Partiesâ at A Later Dateâ and Interested Parties Must Respond To The Solicitation To Be Considered For Award.â â this Notice Does Not Commit The Government To Contract For Anyâ supplies Orâ services.â â the Government Will Not Pay For Any Information Or Administrative Cost Incurred In Response To This Request For Information.â â information Will Only Be Accepted In Writing Via Email.
disclaimerâ â
this Rfi Is Issued Solely For Information And Planning Purposes Only And Does Not Constitute A Solicitation. All Information Received In Response To This Rfi That Is Marked As Proprietary Will Be Handled Accordingly.â â responses To This Notice Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract.â â responders Are Solely Responsible For All Expenses Associated With Responding To This Rfi.â
Closing Date15 Jan 2025
Tender AmountRefer Documents
YANOG ELEMENTARY SCHOOL Tender
Machinery and Tools
Philippines
Details: Description Project Name: Procurement Of Office Supplies, Materials, And Equipment For Various School Operations Address: Yanog Elementary School, Kabankalan City, Negros Occidental Contact Information: +63 919 3620 604 / 117872@deped.gov.ph Request For Quotation Date: January 9, 2025 Quotation No.: 2025-01-002 Mode Of Procurement: Svp To All Eligible Service Providers: I. Please Quote Your Lowest Price Inclusive Of Vat On The Item/s Listed Below, Subject To The Terms And Conditions Of This Rfq, And Submit Your Quotation Duly Signed By Your Representative In An Envelope Not Later Than January 17, 2025, At Yanog Elementary School. For More Information, Kindly Send An E-mail At 117872@deped.gov.ph. Prospective Service Providers/suppliers Shall Be Responsible To Verify Details Of Items Described Below With The Bids And Awards Committee, Cellphone No. +63 919 3620 604 Signed Maria Asuncion L. Gatumbato Chair, Bids And Awards Committee Ii. Delivery Date For The Service/s Schedule Of Delivery Delivery Location Approved Budget For The Contract Price Offered For The Item/s 4th Week Of January 2025 Morning Yanog Es, Sitio Yanog, Brgy. Tampalon, Kabankalan City 114,941.00 Name Of Project: Procurement Of Office Supplies, Materials, And Equipment For Various School Operations This Is To Submit Our Price Quotations As Indicated Above Subject To The Terms And Conditions Of This Rfq. Service Provider's Name: Tin No.: Address: Telephone No.: Fax No.: E-mail Address: Service Provider's Authorized Representative: (signature Over Printed Name) Date Signed: Instruction: Indicate “comply” Or “not Comply” In The Space Provided Below. Unit Item Description Qty Unit Cost (abc) Total Cost (abc) Price Offered (per Unit) Total Price Offered Statement Of Compliance (state "comply" Or "not Comply") Pc Stapler With Remover, Heavy Duty, #35 2 350.00 700.00 Pc 12” Rotatable Long Arm Stapler, Heavy Duty 1 400.00 400.00 Pc Puncher With Ruler, Heavy Duty 2 220.00 440.00 Pc Tape Dispenser, For 24mm Tape 1 170.00 170.00 Pc Steel Rack Organizer, 5 Layer 3 1,800.00 5,400.00 Pc Office Chair, Swivel, Mesh 2 1,500.00 3,000.00 Pc Plastic Chair 10 500.00 5,000.00 Pc Storage Box, 50 Liters 4 400.00 1,600.00 Pc Extension Wire, 3-gang, 5 Meters 3 400.00 1,200.00 Ream A4-sized Bond Paper, Sub. 20 81 250.00 20,250.00 Ream Letter-sized Bond Paper, Sub. 20 24 235.00 5,640.00 Ream Legal-sized Bond Paper, Sub. 20 26 270.00 7,020.00 Bot Epson Ink Refill, #664, Black 40 320.00 12,800.00 Bot Epson Ink Refill, #664, Cyan 17 320.00 5,440.00 Bot Epson Ink Refill, #664, Magenta 17 320.00 5,440.00 Bot Epson Ink Refill, #664, Yellow 17 320.00 5,440.00 Pc Folder, Legal Size, White 60 8.00 480.00 Pc Folder, Legal Size, Green 30 8.00 240.00 Pc Folder, Expanded, Legal Size, Green 30 20.00 600.00 Pc Ballpen, Black 46 9.00 414.00 Pc Ballpen, Blue 46 9.00 414.00 Pc Ballpen, Red 12 9.00 108.00 Box Sign Pen, 0.7mm, Black 2 350.00 700.00 Box Fastener, Plastic Coated, Vinyl 5 50.00 250.00 Bot Glue, Multi-purpose, Transparent 5 60.00 300.00 Pc White Board Marker, Black/blue 3 35.00 105.00 Pc Record Book, 300-pages 5 110.00 550.00 Box Paper Clip, Vinyl, 50mm 5 25.00 125.00 Box Staple Wire #35 5 70.00 350.00 Roll Tape, Transparent, 1 Inch 9 30.00 270.00 Pack Sticker Paper, Long, Matte, 90gsm, 10s 5 50.00 250.00 Yard Plastic Cover #5 20 50.00 1,000.00 Pc File Document Organizer, Long 10 200.00 2,000.00 Pc Medal With Deped Logo 100 50.00 5,000.00 Pc Certificate Holder, A4 20 55.00 1,100.00 Roll Ribbon, 1 ½, Assorted Colors 10 200.00 2,000.00 Pack Vellum Paper, A4 10 50.00 500.00 Pack Photo Paper, Inkjet Copy, 180gsm, A4, Glossy, 20s 5 180.00 900.00 Pack Parchment Paper 10 50.00 500.00 Ream Laminating Film, A4, 125 Microns 1 1,000.00 1,000.00 Pc Stick Glue 50 5.00 250.00 Pack Push Pins 5 30.00 150.00 Yard Plain Fabric, For Backdrop 15 40.00 600.00 Pc Decorative Artificial Flowers 62 50.00 3,100.00 Pc Electric Fan, Stand Type, Heavy Duty 5 1,500.00 7,500.00 Bot Liquid Hand Soap, Anti-bac, 450ml 4 220.00 880.00 Bot Toilet Bowl Cleaner (multi-action), Toilet And Urinal, 1000ml 4 240.00 960.00 Tube Dishwashing Paste 2 55.00 110.00 Bot Disinfectant Spray, 170g 4 255.00 1,020.00 Pc Soft Tambo 3 120.00 360.00 Pc Bathroom Deodorant (albatross) 5 45.00 225.00 Pc Trash Bins, Plastic, Office Use 3 80.00 240.00 Roll Tissue Paper, 2-ply, 150 Pulls 9 50.00 450.00 *nothing Follows* Total 114,941.00 Items Description Statement Of Compliance (state “comply” Or “not Comply”) Other Requirements: Mayor’s Permit Philgeps Registration Bir Registration Free Delivery Notarized Omnibus Sworn Statement Iii. Terms And Conditions A. Submission Of Requirements 1. Quotations And Other Requirements Stated Below Shall Be Addressed To The Bids And Awards Committee (bac) Chairperson C/o Bac Secretariat At Yanog Elementary School, So. Yanog, Brgy. Tampalon, Kabankalan City. If Quotation Is Sealed, Please Indicate In The Envelope The Quotation Number And Name Of Service Provider/supplier. 2. In Addition, You Are Required To Submit The Following Necessary Documents: A. Present Valid Mayor’s Permit Or Official Receipt As Proof Of Renewal Upon Post-qualification; Or B. Present Valid Mayor’s Permit Prior To Payment C. Philgeps Registration Number D. Certificate Of Registration Issued By Bir Or Bir 2303 E. Notarized Omnibus Sworn Statement With The Submission Of Bid Documents (note: Service/provider Or Supplier Who Already Submitted Their Documents In The Previous Procurement Activities May No Longer Submit The Documents Mentioned Above.) B. Price Validity Price Should Be Valid Thirty (30) Calendar Days After The Deadline Of Submission Of Quotation. C. Ocular Inspection The Bac, If Necessary, May Order The Conduct Of An Ocular Inspection Prior To Award And/or Conduct Of The Event. D. Award The Provider Who Submitted The Lowest Calculated Responsive Quotation And Who Passed Post Qualification Conducted By The Bac And End-user Shall Be Awarded The Contract. In Case Of Tie Of Two Or More Bidders Whose Bids Are Determined And Declared As The Lowest Calculated And Responsive Bids (lcrb) Having Been Post-qualified, The Method To Be Used To Break The Tie Is “draw Lots” Which Is Non-discretionary And Non-discriminatory. In Case Of Non-appearance Of One Party, It Waives The Right To Participate In The Drawing Of Lots But Not In The Acceptance Of Award If Declared As Winner. E. Delivery Of Service Delivery Of Goods/s Shall Be On The Date Specified In The Request For Quotation (rfq) Or In The Purchase Order. In Case The Service/s Shall Be Moved By The End-user Within The Validity Period (30 Days) The Service Provider Is Responsible To Accommodate The Request. On The Other Hand, The Service Provider May Reject The Award If The New Schedule Is Beyond The Validity Period. F. Evaluation Of Quotations Quotation Shall Be Compared And Evaluated On The Basis Of The Following Criteria: 1. Price Quotation; 2. Compliance With Items & Description 3. Completeness Of Documents Submitted Note: (validation Of The Submitted Documents Is Done During Post-qualification) G. Instructions 1. The Service Provider Or Supplier Shall Be Responsible For The Source(s) Of Its Goods/services/equipment, Which It Shall Provide In Accordance With The Schedule, And Specifications Of The Rfq Or Contract. Failure Of The Provider To Comply With This Provision Shall Be Ground For Cancellation Of The Award Or Purchase Order/contract Issued To The Provider. 2. The Service Provider Or Supplier Who Accepted A Contract But Failed To Deliver The Required Goods/services/equipment Within The Time Called For In The Contract Shall Be Disqualified From Participating The Future Procurement Activities Of This Procuring Entity. This Is Without Prejudice To The Imposition Of Other Sanctions Prescribed Under R.a. 9184 And Its Revised Irr Against The Service Provider Or Supplier. 3. All Duties, Excise, And Other Taxes And Revenue Charges Shall Be Paid By The Provider. 4. All Transactions Are Subject To Withholding Of Credible Value Added Tax And/or Expanded Value Added Tax Per Revenue Regulation(s) Of The Bureau Of Internal Revenue. H. Liquidated Damages A Penalty Of One-tenth Of One Percent (0.001) Of The Total Value Of The Undelivered Goods/services/equipment Shall Be Charged As Liquidated Damages For Every Day Of Delay Of The Delivery Of The Purchased Goods. I. Warranty Supplier Warrants That All Goods/services/equipment To Be Provided Are Of Acceptable Industry Standard. J. Payment One Hundred Percent (100%) May Be Paid To The Provider’s Account Less Government Taxes After The Complete Delivery/ies; Based On The Actual Completed Delivery Of The Goods/services. The Bids And Awards Committee Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders.
Closing Date17 Jan 2025
Tender AmountPHP 114.9 K (USD 1.9 K)
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+1Building Construction
United States
Details: This Announcement Is Not A Request For Proposal; No Solicitation Package Will Be Issued Until After An Evaluation Has Been Made On The Provided Sf-330s. There Will Be No Site Visits Arranged During This Phase Of The Requirement.
this Is A Special Notice/request For Sf-330s For The Establishment Of An Architect-engineering (a/e) Contract With Services To Be Performed In The Hampton Roads Area In Hampton, Va. This Requirement Is Being Executed Under A 100% Set-aside To Service-disabled Veteran Owned Small Business (sdvosb) Firms Under Vaar 852.219-73. Interested Firms Must Be Registered In The Small Business Administration S (sba) Veteran Small Business Certification (vetcert) Database To Be Considered.
the Sba Vetcert Is Located Here: Https://veterans.certify.sba.gov/#home
blank Sf-330s Can Be Downloaded Through The Gsa Forms Library At: Https://www.gsa.gov/forms
interested Firms Should Submit Their Current Sf-330, Parts I And Ii, To Contract Specialist, Donteana Gibbs Via Email At, Donteana.gibbs@va.gov And Contracting Officer, Guy K. Brooks Via Email At, Guy.brooks@va.gov. The Sf-330s Are Due No Later Than 3:00pm Edt, Thursday, January 9, 2025.
scope Of Work
this Project Requires The Services Of An Architectural-engineering (a/e) Firm With Experience In Historical Preservation. The A/e Must Possess Expertise In Both Architectural And Electrical Engineering, Particularly In Designing Campus Historical Preservation. All Designs Must Comply With Va Guidelines And Specifications. The Scope Of This Project Includes Requires The A/e To Renovate 51,808sf Of Space In Building 27 As Well As The Building Exterior In Accordance With Historical Preservation Guidelines. Work Includes Architectural, Mechanical, Structural, Plumbing, Electrical, Along With Historical Preservation Requirements. The Design Shall Include The Phasing Of Work To Minimize Impact On The Medical Center.
intent
the A/e Shall Provide Design And Construction Period Services For Non-recurring Maintenance (nrm) Construction Project 590-25-200 Campus Historical Preservation Building 27. The Intent Of The Historical Preservation Work Is To Ensure The Careful Restoration And Maintenance Of A Building S Architectural Integrity While Integrating Essential Engineering Systems Such As Mechanical, Electrical, Structural, Telecommunication, Fire Protection, And Plumbing.
requirements
the Requirements Of This A/e Project Will Include, But Are Not Limited To Site Investigation, Creating Documents, Drawings, And Specifications, And Final Inspection Of Construction. Please Carefully Read Attachment A Scope Of Work (sow) For The Full Details Of This Project.
evaluation Of Offerors
a/e Firms Will Be Selected Based Upon The Criteria Detailed In Attachment B Selection Criteria. Please Read The Selection Criteria Carefully And Provide Documented Experience And Skills That Addresses All Factors And Subfactors.
selection Process
the Agency Has Convened An Evaluation Board For The Evaluation Of Responses To This Notice. Responses Will Be Evaluated In Accordance With The Selection Of Architects And Engineers Statute (public Law 92-582), Formerly Known As The Brooks Act, And Implemented In Federal Acquisition Regulation (far) 36.6. Specifically, Sf 330 Submissions Will Be Evaluated To Identify The Most Highly Qualified Firms, Using The Selection Criteria In Attachment B. Discussions Will Be Held With The Three (3) Highest Rated Firms. Interviews May Be Conducted. The Processes At Far 36.602-4 And Far 36.606 Will Then Be Followed.
selection Interview
interviews Shall Be Scheduled With Firms Slated As The Most Highly Qualified. Firms Slated For Interviews Will Be Asked A Series Of Established Questions. Elaborate Presentations Are Not Desired.
general Information
all Design And Work Will Conform To The Current Edition Of The Va Master Specifications And Va Design Standards (published At Www.cfm.va.gov/til) As Well As All Asme, Osha, Ibc 2009, Nfpa And Nec Building Codes And Standards. All Work Shall Be Coordinated Through The Contracting Officer S Representative (cor). The A/e Firm Will Prepare Drawings And Specifications In Enough Detail Such That Qualified Outside General Contracting Companies Can Prepare Accurate And Timely Proposals For The Desired Construction Work. Microsoft Project Scheduling And Management Software Will Be Used By Both The A/e And Contractors To Allow For Regular Tracking Of Schedules And Work By The Va Medical Center. Schedules With Ms Project Will Be Regularly Sent To The Cor Upon Project Initiation And Whenever Significant Changes Occur In The Schedule.
in Accordance With Vaar 836.204(h)(1), The Estimated Magnitude Of Construction Is Between $10,000,000 And $20,000,000. The A/e Will Provide An Initial Estimate Of Cost To Perform The Above Work And Will Design Only Those Items That Can Be Provided Within The Cost Limitation. The Estimated Cost Of Construction (ecc) Shall Only Be Provided To The Contractor In Which A Formal Proposal Is Sought For The Purposes Of Providing A Proposal. The A/e Will Provide Documents At Each Submission As Indicated In The Statement Of Work.
the Naics Code For This Procurement Is 541330 - Engineering Services. The Current Small Business Size Standard For 541330 Is $25.5 Million.
design Costs
all Offerors Are Advised That In Accordance With Vaar 836.606-71 The Total Cost Of The Architect Or Engineer Services Contracted For The Production And Delivery Of Designs, Plans, And Specifications Shall Not Exceed Six Percent (6%) Of The Estimated Cost Of The Construction Project Plus Any Fees For Related Services And Activities. Additionally, Far 52.236-22 Design Within Funding Limitations, Will Be Applicable To This Procurement Action. Design Limitation Costs Will Be Provided To The Most Highly Rated A/e Firm(s) Selected In Accordance With The Outlined Process.
limitations On Subcontracting
iaw Vaar 852.219-73, Va Notice Of Total Service-disabled Veteran-owned Small Business Set-aside And 13 Cfr 125.6, A Service-disabled Veteran-owned Small Business Concern (sdvosb) Agrees That, In The Performance Of The Contract, It Will Not Pay More Than 50% Of The Amount Paid By The Government To Firms That Are Not Similarly Situated. Firms That Are Similarly Situated Are Those That Are Also Sba-registered Sdvosbs.
requirements For Electronic Submission
all Responses To This Special Notice Must Be Submitted Electronically As Described Below. Failure To Comply With This Requirement May Jeopardize The Possibility Of Receiving An Award For The Contract Due To Non-compliance With The Terms Of The Solicitation. You Must Submit Your Electronic Offer, And Any Supplemental Information (such As Spreadsheets, Backup Data, Technical Information), Using Any Of The Electronic Formats And Media Described Below.
in Addition, Contractors Are Notified Of The Award Via An Electronic Notice Of Award E-mail. The Award Document Will Be Attached To The Notice Of Award E-mail.
acceptable Electronic Formats (software) For Submission Of Offers
files Readable Using The Current Microsoft Office Version Products: Word, Excel, Powerpoint, Or Access. Spreadsheet Documents Must Be Sent In A Format That Includes All Formulas, Macro, And Format Information. Print Or Scan Images Of Spreadsheets Are Not Acceptable. Please See Security Note Below For Caution Regarding Use Of Macros. When Submitting Construction Drawings Contractors Are Required To Submit One Set In Autocad And One Set In Adobe Pdf. (purpose: Contracting Can Open The Pdf Version And Engineering Can Open Autocad Files)
files In Adobe Pdf (portable Document Format) Files: When Scanning Documents Scanner Resolution Should Be Set To 200 Dots Per Inch, Or Greater.
another Electronic Format. If You Wish To Submit An Offer Using Another Format Than Those Described In These Instructions, E-mail The Contracting Officer/specialist Who Issued The Solicitation. Please Submit Your Request At Least Five (5) Calendar Days Before The Scheduled Closing Date Of The Solicitation. Request A Decision As To The Format Acceptability And Make Sure You Receive Approval Of The Alternate Format Before Using It To Send Your Offer.
please Note That We Can No Longer Accept .zip Files Due To Increasing Security Concerns.
e-mail Submission Procedures
for Simplicity In This Guidance, All Submissions In Response To A Solicitation Will Be Referred To As Offers.
subject Line: Include The Solicitation Number, Name Of Company, And Closing Date Of Solicitation.
size: Maximum Size Of The E-mail Message Shall Not Exceed Ten (10) Megabytes. The Sf330, In Its Entirety, Shall Not Exceed One Email Of 5mb. The Sf330 (not Including Past Performance Questionnaires) Are Limited To 45 Pages. If The Page Limits Are Exceeded, The Pages In Excess Of The Limit Will Not Be Read Nor Considered. Only One Email Is Permitted Unless Otherwise Stated In This Paragraph Or In Writing By The Contract Officer Submitting The Solicitation. Due To Va It Security Protocols, Email Submissions Are Limited To 10mb Per Email. Furthermore, It Is The Sole Responsibility Of The Prospective Firms To Confirm Receipt Of Their Submission In Its Entirety Prior To The Closing Date & Time Of Their Submission In Response To This Synopsis.
the Microsoft Outlook © Email Time/date Stamp Will Be Used To Date And Time Stamp Offers For The Official Record Of Receipt For The Submission. The Date And Time Stamp In Recipient S Inbox Is The Official Record Of Receipt.
security Issues, Late Bids, & Unreadable Offers
late Submission Of Offers Is Outlined At Far Parts 52.212-1(f), 52.214-7, And 52.215-1(c)(3). Attention Is Warranted To The Portion Of The Provision That Relates To The Timing Of Submission.
please See Far 15.207(c) For A Description Of The Steps The Government Shall Take With Regard To Unreadable Offers.
to Avoid Rejection Of An Offer, Vendors Must Make Every Effort To Ensure Their Electronic Submission Is Virus-free. Submissions Or Portions Thereof Submitted And Which The Automatic System Detects The Presence Of A Virus, Or Which Are Otherwise Unreadable, Will Be Treated As Unreadable Pursuant To Far Part 15.207(c).
the Virus Scanning Software Used By Our E-mail Systems Cannot Always Distinguish A Macro From A Virus. Therefore, Sending A Macro Embedded In An E-mail Message Or An E-mail Attachment May Cause The E-mail Offer To Be Quarantined. You May Send Both The Spreadsheet And The Spreadsheet Saved In Pdf Format To Ensure That Your Proposal Is Readable.
password Protecting Your Submission Is Not Permitted. The Contracting Officer Will File The Offer Electronically Which Will Allow Access Only By Designated Individuals.
important Notice
apparent Successful Offerors Must Apply For And Receive Verification From The Small Business Administration (sba) In Accordance With 38 Cfr Part 74 And Vaar 819.70 By Submission Of Documentation Of Veteran Status, Ownership, And Control Enough To Establish Appropriate Status, Offerors Must Be Both Visible And Verified By The Small Business Administration (sba) At The Time Of Submission Of Offers And At The Time Of Award. Failure To Be Both Verified By Sba And Visible On Vetcert At The Time Of Submission Of Offers And At The Time Of Award Will Result In The Offeror S Proposal Being Deemed Non-compliant. All Offerors Are Urged To Contact The Sba And Submit The Required Documents To Obtain Sba Verification Of Their Sdvosb Status If They Have Not Already Done So.
attachments
Closing Date9 Jan 2025
Tender AmountRefer Documents
City Of Bayawan Tender
Civil And Construction...+1Construction Material
Philippines
Details: Description "republic Of The Philippines Province Of Negros Oriental City Of Bayawan" Bids And Awards Committee Bid No.: Itb 24-313 Date.: 05.dec.2024 Invitation To Bid Sealed Bids For Quotation Of Prices Will Be Recieved For The Purchase Of The Following Supplies, Materials And Equipment Of The Government To Be Opened On The Date, Place, And Time Stated In Instruction To Bidders. Item No. Qty Unit Articles Brand "unit Price" Total Lot No. I Aggregates 1 30 Cu.m. Sand, Washed Mixing/screened 2 30 Cu.m. Gravel, Mixing Crushed Screened And Washed Max. Size 20mm Dia 3 20 Cu.m. Boulders, (150mm Dia - 200mm Dia) Lot No. Ii Bar And Rebar 4 52 Length Angle Bar, 6mm X 50mm X 50mm X 6m) 5 50 Length Angle Bar, 4.5mm X 25mm X 25mm X 6m 6 10 Length Flat Bar, 4mm X 38mm X 6m 7 10 Length Round Bar, Plain, 10mm Diameter X 6.0m 8 50 Length Square Bar, 12mm X 6m 9 300 Length Deformed Steel Bar, 10mm Dia X 6m, Grade 275 10 30 Length Deformed Steel Bar, 12mm X 6m, Grade 275 Lot No. Iii Cement And Additives 11 500 Bag Cement, Portland (40kgs/bag), Type 1 Lot No. Iv Gas And Gases For Oxygen And Acetylene Only 12 5 Tank Oxygen Gas, Refill; (1600 Psi - 1800psi); Kilograms Per Tank 13 2 Tank Acetylene Gas , Refill Lot No. V Masonry Supplies 14 3000 Piece Hollow Block, Concrete, 10cm X 20cm X 40cm Lot No. Vi Commercial Lumber 15 50 Piece Lumber, G-melina Mahogany And Equivalent 50mm X 50mm X 2.4m 16 26 Piece Lumber, G-melina Mahogany And Equivalent 50mm X 50mm X 3.6m 17 54 Piece Lumber, G-melina Mahogany And Equivalent 50mm X 75mm X 3.6m 18 22 Piece Commercial Lumber, G-melina, Mahogany And Equivalent, 50mm X 75mm X 3.0m Lot No. Vii Personal Protective Equipment 19 30 Piece Gloves, Rubber & Cloth Combination For Construction 20 10 Pair Boots, Rain, Rubber Mens Size: 8 21 20 Pair Boots, Rain, Rubber Mens Size: 7 22 13 Piece Hard Hat, High Quality And Heavy Duty For Industrial/construction, Safety Helmet, Uv-resistant, Hdpe, Ce En397, W/ Chin Strap, Blue 23 8 Piece Hard Hat, High Quality And Heavy Duty For Industrial/construction, Safety Helmet, Uv-resistant, Hdpe, Ce En397, W/ Chin Strap, Yellow 24 2 Piece Hard Hat, High Quality And Heavy Duty For Industrial/construction, Safety Helmet, Uv-resistant, Hdpe, Ce En397, W/ Chin Strap, White Lot No. Viii Roof, Wall And Ceiling Supplies 25 91 Sheet Corrugated Sheet, G.i. 0.27mm X 3.60m 26 91 Sheet Corrugated Sheet, G.i. 0.27mm X 3.0m) 27 15 Sheet Gi Plain Sheet, 0.30mm X 0.9m X 2.4m 28 80 Length C-purlins, 1.0mm X 50mm X 100mm X 6.0m Lot No. Ix Paints, Tools And Supplies 29 20 Gallon Urethane Paint (gal), 30 5 Gallon Paint, Urethane (thalo Blue Or Equivalent) 31 10 Gallon Paint Primer, Epoxy W/ Catalyst (gal Black 32 10 Piece Paint Brush, 100mm (4"), Hair Type 33 12 Piece Baby Paint Roller, 4 Inches, With Handle, Cloth 34 3 Gallon Paint , Urethane, Top Coat Clear 35 5 Can Urethane Thinner, 3.75lit/can 36 5 Can Lacquer Thinner, 3.75 (liter/can) 37 5 Gallon Body Filler, W/ Hardener Lot No. X Plumbing Supplies 38 16 Length Gi Pipe, 100mm Dia X 6m Sched 40 Wt=4.0mm Outside Dia= 114.3 10.880kg/m Light Gauge 39 30 Length Gi Pipe 25mm Dia X 6m, Sched 40 Wt=2.6mm Outside Dia= 33.040 1.975kg/m Light Gauge 40 10 Length Gi Pipe, 32mm Dia X 6m Sched 40 Wt=2.8mm Outside Dia= 42.20 2.720kg/m Light Gauge 41 20 Length Gi Pipe, 15mm Dia X 6m Sched 40 Wt=2.0mm Outside Dia= 21.30 0.952kg/m Light Gauge 42 4 Piece Faucet, Stainless, 20mm Outside Dia, One Way Type (on/off), Good Quality 43 2 Piece Floor Drain, 100mm X 100mm Dia Stainless 44 3 Piece Pvc Clean-out, 107.10mm Dia W/ Cover 45 15 Piece Coupling, Upvc, 20mm Inside Dia, One End Treaded, Blue 46 3 Piece Pvc Tee, Sanitary, Inside Dia: 107.10mm, S-1000, Orange 47 20 Length Elbow, Upvc, 20mm Inside Dia X 90 Deg. Bend, One End Threaded, Blue 48 4 Piece Pvc Elbow, 107.10mm Inside Dia X 45 Deg. Bend Orange 49 2 Set Toilet Bowl, Porcelain W/ Flush 50 2 Roll Tape, Thread Seal, 20mm X 10m 51 4 Length Pvc Pipe, 107.10mm Outside Dia X T=3.81mm X L=3.0m Orange 52 2 Piece Coupling, Pvc, 107.10mm Inside Dia, S-1000, Orange 53 10 Piece Pvc Wye, 107.10mm Dia Orange 54 10 Length Pipe, Upvc, 20mm Outside Dia, Wt=1.8min, L=3.0m, Blue, With Hub 55 15 Piece Upvc Tee, 20mm Dia Blue Lot No. Xi Steel Sheets And Mesh 56 18 Roll Steel Matting, 50mm X 50mm Eyehole 1.2m Width 3.5mm Wire Dia (6m/roll)) 57 20 Linear Meter Screen/mesh Wire, 3mm Eyehole X 0.90m Width (m) 58 35 Piece Plastic Matting, Interlocking Design, Heavy Duty, 1 Ft X 3 Ft Lot No. Xii Carpentry Tools And Supplies 59 5 Box Rod/electrode, Welding, E6013, 1/8" (bx)) (matchless Quality, Iso 9001, 2000 Certified, 20 Kg/box) 60 30 Piece Grinding Disc , Wheel Stone, 4", 110mmx22mm, Iso 9001 61 50 Piece Cutting Disc, 105 X 1.0 X 16mm For Metal 62 110 Piece Blade, Hacksaw, 12mm X 300mm, 18tpi, (excellent Quality) 63 50 Kilo Tie Wire, # 16 64 10 Kilo Nails, Common Wire 38mm 65 15 Kilo Nails, Common Wire, 50mm (2") 66 10 Kilo Nails, Common Wire, 62mm 67 10 Kilo Nails, Common Wire, 100mm (4") 68 20 Sheet Plywood, Marine 5mm X 1.2m X 2.4m, Type I, Grade A/a 69 3500 Piece Tex Screw, 63mm For Steel 70 50 Piece Sand Paper, #80, 225mm X 275mm 71 50 Piece Sand Paper, # 220 72 60 Piece Sand Paper, #120, 225mm X 275mm *** Nothing Follows *** Issuance Of Bid Documents: December 10, 2024 To December 27, 2025@ 5:00 P.m. Pre-bid Conference: December 17, 2024@ 9:00 Am Deadline/opening Of Bids: January 2, 2025@ 9:00am Grand Total: Place Of Delivery: Fob Bayawan, City Warehouse Form And Amount Of Bid Security I Hereby Certify That The Above Articles Are Equally Carried In Stock By Me In Quantities Above Sstated Except Those Marked "none". Terms And Conditions Specified In The Annex Of This Are Herein Accepted. The Quantity Shown And Prices As Quoted Are Hereby Offered. Name Of Business/company Address/contact Number Signature Over Printed Name Evaluation: Bids And Awards Committee Virginia D. Sadiasa, Chairman Corazon P. Lirazan, Member Saturnino T. Dayanan, Vice Chairman Nefredo Camilo A. Villarubia, Member Wilfredo C. Tuale, Member Ernest N. Dinoipol, Member
Closing Date2 Jan 2025
Tender AmountPHP 1.3 Million (USD 23.5 K)
OBANDO WATER DISTRICT Tender
Civil And Construction...+1Construction Material
Philippines
Details: Description Request For Quotation Rfq No. : Owd-rfq-2024-028 Rfq Date : December 20, 2024 Place Of Delivery : Obando Water District 004 P. Sevilla St., Catanghalan, Obando, Bulacan Date Of Delivery : Within Seven (7) Days Upon Receipt Of P.o. Approved Budget Of The Contract (abc) : Five Hundred Eighty-three Thousand Six Hundred Fifty-seven And 50/100 (php583,657.50) Pr No. : Owd-pr-2024-028 Bid Validity : Quotations Shall Be Valid Until March 31, 2025 Sir/madam, Please Quote Us Your Government Price/s For The Item/s Listed Below Not Later Than January 2, 2025, 4:00 Pm. Kindly Submit As Well Documentary Requirements, As Follows: 1. Mayor’s/business Permit 2. Philgeps Registration Number/certificate 3. Department Of Trade And Industries (dti) Certificate Of Business Registration/ Securities And Exchange (sec) Registration 4. Bir Certification Of Registration For Any Clarification, You May Contact Us At Telephone No. (02) 8367-7081 Or Email Address At Obandowd@yahoo.com. Very Truly Yours, Eric Joseph M. Avena Bac Secretariat Item No. Qty Unit Item Description Brand Unit Price (vat Inclusive) Total (vat Inclusive) 001 20 Pcs Coco Lumber 2x3x10 *for Scaffolding And As Form 002 2 Pcs Marine Plywood ¼” *5mm Thickness For Concrete Form 003 6 Kgs Cwn #4 *round Head And Diamond Point 004 6 Kgs Cwn #3 *round Head And Diamond Point 005 4 Kgs Cwn #2 *round Head And Diamond Point 006 2 Kgs Cwn #1 * Round Head And Diamond Point 007 6 Kgs Concrete Nail, #4 *for Concrete 008 3 Kgs Concrete Nail, #3 *for Concrete 009 2 Box Thhn Wire, #12 *stranded 010 7 Pcs 3-gang Switch (waterproof) *waterproof High Quality Switch Set 011 18 Pcs 2-gang Universal Outlet (waterproof) *waterproof & High Quality Outlet 012 14 Pcs Amco Box *matte Finish Abs Plastic 013 22 Pcs Junction Box With Cover (ceiling) *high Quality Polyvinyl Chloride (pvc) 014 10 Pcs Electrical Tape *resist High Voltages *tolerate Wide Temperature Variances 015 6 Pcs Led Ceiling Light 40 Watts *energy Saving & Long Lifetime 016 12 Pcs Electrical Pvc Pipe ½” *as Per Nec 352 017 12 Pcs Electrical Pvc Coupling ½” *as Per Nec 352 018 12 Pcs Electrical Pvc Elbow ½” *as Per Nec 352 019 12 Pcs Electrical Pvc End Bell ½” *as Per Nec 352 020 2 Pcs Circuit Breaker 30 Amp *rated Voltage:ac230/400v, 50/60hz *mechanical Life: 10000 Times 021 1 Pcs Circuit Breaker 20 Amp *rated Voltage:ac230/400v, 50/60hz *mechanical Life: 10000 Times 022 30 Pcs Hdpe Conduit ¾” (black) *flexible, Durable Material 023 5 Pcs Solar Street Light 120 Watts With Motion Detection *ip 65 Waterproof Rating *outdoor Led Light 024 80 Pcs Hollow Blocks #4 *for Exterior Wall *heavy Duty 025 6 Bags Cement *portland Cement, 40 Kg Bag 026 0.5 Cu.m Sand *fine 027 6 Pcs Deformed Steel Bars #10 *astm A615 *hot Rolled Deformed Bar Grade-40 028 1 Kgs Tie Wire *gauge #16 029 400 Pcs H0llow Blocks #5 *for Exterior Wall *heavy Duty 030 53 Bags Cement *portland Cement, 40 Kg Bag 031 5.5 Cu.m Sand *fine 032 2 Cu.m Gravel *crushed Stone *20mm In Size 033 30 Pcs Deformed Steel Bars #10 *astm A615 *hot Rolled Deformed Bar Grade-40 034 15 Pcs Deformed Steel Bars #12 * Astm A615 *hot Rolled Deformed Bar Grade-40 035 14 Pcs Deformed Steel Bars #16 *astm A615 *hot-rolled Deformed Bar Grade-40 036 2 Kgs Tie Wire *gauge #16 037 12 Pcs Machine/ Anchor Bolt 16 Mm *thread Pitch 2.0mm P. *high Tensile 038 10 Bags Cement *portland Cement, 40 Kg Bag 039 1 Cu.m Sand *fine 040 95 Bags Cement *portland Cement, 40 Kg Bag 041 6 Cu.m Sand *fine 042 11 Cu.m Gravel *crushed Stone *20mm In Size 043 80 Pcs Deformed Steel Bars #10 *astm A615 *hot-rolled Deformed Bar Grade-40 044 4 Kgs Tie Wire *gauge #16 045 52 Cu.m Backfill Materials *natural Soil *free From Rocks, Wood, Or Other Unsuitable Material 046 84 Pcs Angular Bar 2” X 2” (3.5mm) *6m Long Black Iron 047 15 Pcs Angular Bar 1 ½” X 1 ½” (3.5mm) *6m Long Black Iron 048 42 Pcs Tubular Steel 2x2 (1.5mm) *square, Galvanized Steel 049 3 Pcs Tubular Steel 2x3 (1.5mm) *square, Galvanized Steel 050 8 Pcs C-purlins 2x6 (1.5mm) *galvanized Steel 051 9 Pcs G.i. Pipe 4” Schedule 40 *zinc Coated, Plain End Steel Pipe 052 4 Pcs G.i. Pipe 3” Schedule 40 *zinc Coated, Plain End Steel Pipe 053 50 Pcs Cutting Disc *for Metal 054 2 Pcs Cut-off Cutting Disc 14” *for Metal 055 6 Boxes Welding Rod *welding Electrode 6013 056 24 Pcs Pre-painted Rib Type Roofing With Insulation *l-6.0m, T-0.5mm Cold-rolled Galvanized Iron Sheets 057 20 Pcs Pre-painted Plain Sheet 1.2m X 2.4m Cold-rolled Galvanized Iron Sheets 058 10 Pcs Side Flushing *pre-painted Gi Sheet 059 6 Pcs Ridgeroll *6m Pre-painted Gi Sheet 060 10 Pcs Stainless Gutter 16 X 8 Ft *box Type Stainless Mirror Or Brush Finish 061 3 Pcs Stainless Inside Gutter 24 X 8 Ft *box Type Stainless Mirror Or Brush Finish 062 4 Pcs Ficemboard 6.0mm *fiber Cement Board 6.0mm Thick 063 1000 Pcs Tex Screw *galvanized, Carbon Steel 064 6 Boxes Drill Bit 1/8” *high Speed Steel (hss) 065 2 Boxes Blind Rivets *aluminum 066 12 Pcs Pvc Pipe 4” (drainage) *polyvinyl Chloride Pipe As Per Astm 2729 Or Iso R-161 067 11 Pcs Pvc Pipe 3” (drainage) *polyvinyl Chloride Pipe As Per Astm 2729 Or Iso R-161 068 14 Pcs Pvc Pipe Tee Reducer 4”x3” *polyvinyl Chloride Pipe As Per Astm 2729 Or Iso R-161 069 1 Pc Pvc Pipe Tee 4” X 4” *polyvinyl Chloride Pipe As Per Astm 2729 Or Iso R-161 070 3 Pcs Pvc Pipe Coupler 4” *polyvinyl Chloride Pipe As Per Astm 2729 Or Iso R-161 071 28 Pcs Pvc Pipe Elbow 3” *polyvinyl Chloride Pipe As Per Astm 2729 Or Iso R-161 072 2 Pcs Pvc Pipe Elbow 4” *polyvinyl Chloride Pipe As Per Astm 2729 Or Iso R-161 073 2 Pcs Pvc Pipe End Cap 4” *polyvinyl Chloride Pipe As Per Astm 2729 Or Iso R-161 074 1 Gals Qde *can Be Thinned With A Solvent *gloss Finish 075 3 Gals Epoxy Primer Paint (gray) *dry Film Thickness 25um Per Coat *excellent Water Resistance 076 3 Gals Roof Paint (green) *acrylic Latex Paint *gloss Finish 077 30 Pcs Sand Paper (#150) *waterproof Abrasive Paper 078 6 Pcs Baby Roller (cotton) *cotton Fiber 079 4 Pcs Paint Brush (#2) *wooden Handle *white Or Black Bristles 080 4 Pcs Paint Brush (#1) *wooden Handle *white Or Black Bristles 081 1 Gal Lacquer Thinner *can Dissolve Most Resins And Stains 082 1 Tins Flat Latex *100% Acrylic Latex *for Interior And Exterior Use 083 2 Tins Semi-gloss Latex *100% Acrylic Latex *for Interior And Exterior Use 084 1 Ltr Acri Color *concentrated Acrylic-solvent Based Tinting Colorant 085 4 Bags Skimcoat *super Fine White *indoor And Outdoor Use *low Voc Levels *crack Resistant *excellent Surface Adhesion 086 10 Pcs Sand Paper (#150) *waterproof Abrasive Paper 087 2 Pcs Masking Tape *pressure-sensitive Tape *made Of A Thin And Easy-to-tear Paper *easily Released Pressure-sensitive Adhesive 088 2 Pcs Roller (#7) *7 Inches *cotton Fiber *plastic Pan 089 2 Pcs Baby Roller (cotton) *cotton Fiber 090 2 Pcs Paint Brush (#2) *wooden Handle *white Or Black Bristles 091 2 Pcs Paint Brush (#1) *wooden Handle *white Or Black Bristles 092 2 Gals Waterproofing Paint *excellent Adhesion On Concrete Substrates *cementitious Finish Total Amount Quotation Submitted By: Name Of Company/establishment : Address : Philgeps Registration No. (required) : Printed Name & Signature Of Authorized Representative : Designation/position : Contact No./s Date :
Closing Date2 Jan 2025
Tender AmountPHP 583.6 K (USD 10 K)
Research Institute For Tropical Medicine, Doh Tender
Healthcare and Medicine
Corrigendum : Closing Date Modified
Philippines
Details: Description Request For Quotation Mode Of Procurement: Small Value Procurement Date: _____________ Pr No.: _____________ Rfq No.: _____________ Company/business Name: Complete Office Address: Business/mayor’s Permit No: Tin: The Research Institute For Tropical Medicine – Department Of Health, Through Its Bids And Awards Committee (bac), Intends To Procure The Below Mentioned Items Through The Above-mentioned Mode Of Procurement Based On The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184. Please Quote Your Best Offer For The Item/s Described Herein, Subject To The Terms And Conditions Provided On This Request For Quotation (rfq). Submit Your Quotation Duly Signed By You, Or Your Duly Authorized Representative Within Five (5) Days Which Shall Be Addressed To The Ritm Bids And Awards Committee. A)the Following Documents Are Required To Be Submitted Along With Your Formal Quotation: Documentary Requirement Remarks Valid And Current Mayor’s/business Permit In Case Not Yet Available, You May Submit Your Expired Mayor’s Or Business Permit With The Official Receipt Of Renewal Application. However, A Copy Of The Latest Mayor’s Or Business Permit Shall Be Required To Be Submitted After Award Of Contract But Before Payment. Valid And Current Certificate Of Platinum Membership With Valid Annex “a” May Be Submitted In Lieu Of The Mayor’s/business Permit Philgeps Registration/membership Bir Form 2303 Company Name Registered In Sec/dti/cda Must Be The Same Registered Name In Bir Form 2303. Latest Annual Income Tax Return With Complete Set Of Audited Financial Statement Or 6 Months Business Tax Return (2550m/2550q) Applicable For: Dc / Np-svp / Np-ec / Np-scientific, Scholarly Or Artistic Work, Exclusive Technology And Media Services With Abcs Above P500,000.00 Note: The Latest Business Tax Returns Are Those Within The Last Six Months Preceding The Date Of Bid Submission Including Proof Of E Payment Details (bank And Bir). B)the Following Documents Shall Be Submitted By The Bidder Before The Issuance Of Notice Of Award: Documentary Requirement Remarks Duly Notarized Revised Omnibus Sworn Statement (10 Provisions) With Latest Rules On Notarial Practice Applicable For: Np-svp With Abcs Above P50,000.00 And Np-ec With Abcs Above P500,000.00 Note: Othe Pr # Shall Be Reflected In The Omnibus Sworn Statement Oone (1) Original Copy Must Be Submitted Othe Issuance And Notarial Date Of The Omnibus Sworn Statement Shall Be The Same/after The Issuance And Notarial Date Of The Authority Of The Signatory. Othe Authorized Representative Declared In The Omnibus Sworn Statement Shall Be In Congruent With The Submitted Authority Of The Signatory. Authority Of The Signatory Applicable For: Np-svp With Abcs Above P50,000.00 And Np-ec With Abcs Above P500,000.00 for Sole Proprietorship – Duly Notarized Special Power Of Attorney, If Signatory Is Other Than The Owner for Corporation – Duly Notarized Secretary’s Certificate for Partnership, Cooperative, Or Joint Venture – Duly Notarized Board/partnership Resolution, Whichever Is Applicable Note: Othe Pr # Shall Be Reflected In The Authority Of The Signatory Oone (1) Original Copy Must Be Submitted Othe Issuance And Notarial Date Of The Authority Of The Signatory Shall Be The Same/shall Come First Before The Issuance And Notarial Date Of The Omnibus Sworn Statement. Note: Incomplete Submission Of The Required Documents Will Be A Ground For Disqualification. For Any Clarification, You May Contact Us At The Contact Information Provided: Mae Marie E. Hernandez Bac Secretariat Head (632) 8807-2628 To 32 Loc. 210 And/or 240 E-mail Address: Procurement@ritm.gov.ph / Procurement_02@ritm.gov.ph Website: Www.ritm.gov.ph Instructions: Note: Failure To Follow These Instructions Will Disqualify Your Entire Quotation. (1)do Not Alter The Contents Of This Form In Any Way. (2)the Use Of This Rfq Is Highly Encouraged To Minimize Errors Or Omissions Of The Required Mandatory Provisions. If Another Form Is Used Other Than The Latest Rfq, The Quotation Shall Contain All The Mandatory Requirements/provisions Including Manifestation On The Agreement With The Terms And Conditions Below. (3)all Technical Specifications Must Be Complied With. Failure To Comply With The Mandatory Requirements Shall Render The Quotation Ineligible/disqualified. (4)quotations May Be Submitted Through Electronic Mail At: Procurement@ritm.gov.ph / Procurement_02@ritm.gov.ph. (5)quotations, Including Documentary Requirements, Received After The Deadline Shall Not Be Accepted. For Quotations Submitted Via Electronic Mail, The Date And Time Of Receipt Indicated In The Email Shall Be Considered. Terms And Conditions: bidders Shall Provide Correct And Accurate Information Required In This Form. any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By You Or Any Of Your Duly Authorized Representative/s. price Quotation/s, To Be Denominated In Philippine Peso, Shall Include All Taxes, Duties, And/or Levies Payable – If Applicable. quotations Exceeding The Approved Budget For The Contract Shall Be Rejected. in Case Of Two Or More Bidders Are Determined To Have Submitted The Lowest Calculated Quotation/lowest Calculated And Responsive Quotation, The Ritm-bac Shall Adopt And Employ “draw Lots” As The Tie-breaking Method To Finally Determine The Single Winning Provider In Accordance With Gppb Circular 06-2005. award Of Contract Shall Be Made To The Lowest Quotation Which Complies With The Technical Specifications, Requirements And Other Terms And Conditions Stated Herein. payment Shall Be Made After Delivery And Upon The Submission Of The Required Supporting Documents, I.e., Order Slip And/or Billing Statement, By The Supplier, Contractor, Or Consultant. Our Government Servicing Bank, I.e., The Land Bank Of The Philippines, Shall Credit The Amount Due To The Identified Bank Account Of The Supplier, Contractor, Or Consultant Not Earlier Than Twenty-four (24) Hours, But Not Later Than Forty-eight (48) Hours, Upon Receipt Of Our Advice. Please Note That The Corresponding Bank Transfer Fee, If Any, Shall Be Chargeable To The Account Of The Supplier, Contractor, Or Consultant. liquidated Damages Equivalent To One-tenth Of One Percent (0.1%) Of The Value Of The Goods Not Delivered Within The Prescribed Delivery Period Shall Be Imposed Per Day Of Delay. Ritm May Terminate The Contract Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, Without Prejudice To Other Courses Of Action And Remedies Available To The Procuring Entity. Technical Offer/proposal: After Having Carefully Read And Accepted The Instructions And Terms And Conditions, I/we Submit Our Technical Proposals/quotations For The Item/s As Follows: Item # Qty/ Unit Item Description Supplier’s Compliance (indicate Brand And/or Model, Including Complete Specifications To Be Offered - Applicable) 1 1/vial Antibiotic Standard, Daptomycin, Powder, 100mg/vial Expiration Date: Shall Not Be Less Than Two (2) Years From The Date Of The Actual Delivery Certificates To Be Submitted Upon Delivery: 1. Usp Certificate With Potency Or Certificate Of Analysis; 2. Safety Data Sheet 2 4/bottle Antibiotic, Geneticin (g418 Sulfate, Selective, Liquid, Sterile, 50 Mg/ml), 20 M/bottle Expiration Date: Shall Not Be Less Than One (1) Year From The Date Of The Actual Delivery 3 92/bottle Antibiotic, Penicillin Streptomycin (pen-strep) Solution, 10,000 U / Ml, 100 Ml/bottle Expiration Date: Shall Not Be Less Than One (1) Year From The Date Of The Actual Delivery *item Should Have Passed The Evaluation Result, Quality Assessment, And Quality Validation/verification Of The End-user Or Should Have Met The Acceptability Criteria Necessary For Laboratory Inter-comparability Of Results, Whichever Is Applicable. *product Brochure 4 1/bottle Antibody, Anti-human Igg, (fc Specific) Produced In Goat Affinity Isolated Antibody, Buffered Aqueous Solution, 1ml/bottle 5 1/vial Antibody, Conjugate, Goat Anti-equine F(ab') 2-hrpo, Lyophilized Powder, 2 Mg/vial Expiration Date: Shall Not Be Less Than Two (2) Years From The Date Of The Actual Delivery 6 1/vial Antibody, Secondary For Ifa, Goat Anti-rabbit Igg (h+l) Alexa Fluor 488, 2 Mg/ml 7 2/bottle Antimicrobial, Rifampicin, Powder, 97%, 5 Grams/bottle Financial Offer/proposal: Please Quote Your Best Offer For The Item/s Below. Please Do Not Leave Any Blank Items. Indicate “0” If Item Being Offered Is For Free: Item # Qty/ Unit Item Description Abc Price Proposal Unit Cost Price Proposal Total Cost 1 1/vial Antibiotic Standard, Daptomycin, Powder, 100mg/vial Expiration Date: Shall Not Be Less Than Two (2) Years From The Date Of The Actual Delivery Certificates To Be Submitted Upon Delivery: 1. Usp Certificate With Potency Or Certificate Of Analysis; 2. Safety Data Sheet 75,000.00 2 4/bottle Antibiotic, Geneticin (g418 Sulfate, Selective, Liquid, Sterile, 50 Mg/ml), 20 M/bottle Expiration Date: Shall Not Be Less Than One (1) Year From The Date Of The Actual Delivery 69,300.00 3 92/bottle Antibiotic, Penicillin Streptomycin (pen-strep) Solution, 10,000 U / Ml, 100 Ml/bottle Expiration Date: Shall Not Be Less Than One (1) Year From The Date Of The Actual Delivery *item Should Have Passed The Evaluation Result, Quality Assessment, And Quality Validation/verification Of The End-user Or Should Have Met The Acceptability Criteria Necessary For Laboratory Inter-comparability Of Results, Whichever Is Applicable. *product Brochure 259,780.40 4 1/bottle Antibody, Anti-human Igg, (fc Specific) Produced In Goat Affinity Isolated Antibody, Buffered Aqueous Solution, 1ml/bottle 16,500.00 5 1/vial Antibody, Conjugate, Goat Anti-equine F(ab') 2-hrpo, Lyophilized Powder, 2 Mg/vial Expiration Date: Shall Not Be Less Than Two (2) Years From The Date Of The Actual Delivery 52,000.00 6 1/vial Antibody, Secondary For Ifa, Goat Anti-rabbit Igg (h+l) Alexa Fluor 488, 2 Mg/ml 18,203.96 7 2/bottle Antimicrobial, Rifampicin, Powder, 97%, 5 Grams/bottle 96,558.00 Delivery Period: 30 Calendar Days Total Offered Quotation In Words: ______________ In Figures: ______________ Price Validity: ________________ Payment Terms: Thirty (30) Calendar Days Payment Details: Banking Institution: _________________________________________________ Account Number: __________________________________________________ Account Name: _________________________________________________ Branch: _________________________________________________ Note: Only The Actual Amount Of The Accepted Items Shall Be Paid. ___________________________ Signature Over Printed Name Of Authorized Representative ___________________________ Position/designation ___________________________ Office Telephone/fax/mobile Nos. ___________________________ Email Address/es
Closing Date17 Jan 2025
Tender AmountPHP 587.3 K (USD 10 K)
BARANGAY TETUAN, ZAMBOANGA CITY Tender
Civil And Construction...+2Others, Civil Works Others
Philippines
Details: Description Republic Of The Philippines Barangay Tetuan Bids And Awards Committee Tetuan 24-0005 M. Nativitad, St., Zamboanga City Invitation To Bid For Purchase Of Four (4) Units Of Aircon Floor Mounted (name Of Project) 1. The City Government Of Zamboanga, Through The Capital Outlay Under Office Equipment 2024 Intends To Apply The Sum Of Four Hundred Eigthy Four Thousand Pesos (p 484,000.00) Only Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Transportation Services Pr No. 24-10-127a. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The City Government Of Zamboanga Now Invites Bids For The Purchase Of Four Units Of Aircon Floor Mounted The Goods Is Required By Ten (10) Calendar Days Bidders Should Have Completed Within A Period Of Ten (10) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project, With A Value Of At Least (50%) Of The Abc And To Meet Other Eligibility Requirements Stated In The Eligibility Documents. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Prospective Bidders May Obtain Further Information From Barangay Hall Of Tetuan In The Office Of The Bids And Awards Committee And Inspect The Bidding Documents At The Address Given Below During 8:00 Am To 5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 20-23, 2024 From The Given Address And Website/s Below And Upon Payment Of A Non-refundable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of P500.00the Method Of Payment Will Be Cash Payable To The Barangay City Treasurer’s Office. The Bidding Documents Shall Be Received Personally By The Prospective Bidder Or His/her Authorized Representative. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees “machine Copy Of The Official Receipt” Not Later Than The Submission Of Their Bids. 6. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission On Or Before November 23, 2024 At 10:00 Am At Office Of The Bids And Award Committee, Conference Room, M. Natividad St., Zamboanga City.late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. All Bids Must Be Accompanied By A Bid Security Which Shall Be A Bid Securing Declaration Or At Least One Other Form Of The Following: Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Confirmed By A Universal/commercial Bank, Irrevocable Letter Of Credit Issued By A Universal/commercial Bank Or From Other Bank Certified By The Bangko Sentral Ng Pilipinas As Authorized To Issue Such Financial Instrument, Provided However That It Shall Be Confirmed Or Authenticated By A Universal/commercial Bank If Issued By A Foreign Bank In The Amount Of P1,230.00or Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security In The Amount Of P3,075.00or Any Combination Of The Foregoing In The Amount Proportionate To Share Of Form With Respect To Total Amount Of Security. The Bid Security Shall Be Denominated In Philippine Pesos And Posted In Favor Of The Procuring Entity. Bidders Are Required To Indicate The Brand Name And/or Name Of Manufacturer Of Goods Offered/quoted, When Appropriate. 8. Bid Opening Shall Be On November 28, 2024 At 10:00 Am At Office Of The Bids And Awards Committee, Conference Room, M. Natividad St., Zamboanga City. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend The Activity. 9. To Be Delivered In The Barangay Hall Of Tetuan. 10. The Brangay Council Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules Or Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. Bidders Are Advised To Use The Bid Form At The Back Of This Itb. Failure To Do So Would Lead To Non-acceptance Of The Bid. 12. For Further Information Please Refer To: Hazel Jane L. Fox Bac Secretariat Barangay Government Of Tetuan M.natividad Street, Zamboanga City Brgytetuan@gmail.com Tel. No. (063) 993-0269 Republic Of The Philippines Barangay Tetuan Bids And Awards Committee Tetuan 24-0005 M. Natividad Street, Zamboanga City Bid Form Date: _____________________ To: Barangay Council Of Tetuan Address: M. Natividad Zamboanga City Having Examined The Philippine Bidding Documents (pbds) Including The Supplemental Or Bid Bulletin Numbers Including Bid Bulletin Numbers Tetuan 24-0005 The Receipt Of Which Is Hereby Duly Acknowledge, We, The Undersigned, Offer To Supply/deliver/perform The Procurement Of Four Unit Of Aircon Floor Mounted Nconformity With The Said Philippine Bidding Documents (pbds) For The Sum Of __________________________________________________________________________________________________________________ (total Bid Amount In Words And Figures) Or The Total Calculated Bid Price, As Evaluated And Corrected For Computational Errors, And Other Bid Modifications In Accordance With The Price Schedules Attached Herewith And Made Part Of This Bid. The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: [specify The Applicable Taxes, E.g. (i) Value Added Tax (vat), (ii) Income Tax’ (iii) Local Taxes, And (iv) Other Fiscal Levies And Duties], Which Are Itemized Herein Or In The Price Schedules, If Our Bid Is Accepted, We Undertake: A. To Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements Of The Philippine Bidding Documents (pbds); B. To Provide A Performance Security In The Form, Amounts, And Within The Times Prescribed In The Pbds; C. To Abide By The Bid Validity Period Specified In The Pbds And It Shall Remain Binding Upon As At Any Time Before The Expiration Of That Period. [insert This Paragraph If Foreign-assisted Project With The Development Partner: Commissions Or Gratuities, If Any, Paid, Paid Or To Be Paid By Us To Agents Relating To This Bid, And To Contract Execution If We Are Awarded The Contract, Are Listed Below: Name And Address Amount And Purpose Of Agent Currency Commission Or Gratuity _______________________________________ _______________________________________ _______________________________________ (if None, State “none”)] Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And Your Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Bid You May Receive. We Certify/confirm That We Comply With The Eligibility Requirements Pursuant To The Pbds. The Undersigned Is Authorized To Submit The Bid On Behalf Of ________________________________________________________ (name Of Bidder) As Evidenced By The Attached ______________________________________________________________________. (state The Written Authority) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Attached Schedule Of Prices, Shall Be A Ground For The Rejection Of Our Bid. Name: _________________________________________________________________________ Legal Capacity: __________________________________________________________________ Signature: ______________________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: _________________________________________ Date:__________________________ Price Schedule For Goods Name Of Bidder _____________________________________________________tetuan 24-0005 Page 1 Of 1 2 3 4 5 6 7 8 9 10 Item Description Country Of Origin Quantity Unit Price Exw Per Item Transportation And All Other Costs Incidental To Delivery, Per Item Sales And Other Taxes Payable If Contract Is Awarded, Per Item Cost Of Incidental Services, If Applicable, Per Item Total Price, Per Unit (col 5+6+7+8) Total Price Delivered Final Destination (col.9) X (col 4) 1 Floor Mounted Air Condition: Outdoor + Indoor Floor Standing With Free 37369 Yh-103 Air Purifier Power: 4.0 Hp Cooling Capacity: 36,000 – 38,000 Btu/hr Compressor: Rotary Eer: 12.5 Cooling Area: 36-50sqm Power Supply: 220v/1ph/60hz With Existing Service Center With Warranty With Free Delivery And Installation 4 Units Purpose: To Be Installed In Some Of The Offices In Tetuan Barangay Hall. Name: _________________________________________________________________________ Legal Capacity: __________________________________________________________________ Signature: ______________________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: ________________________________________ Date: ________________________________ Schedule Of Requirements The Delivery Schedule Expressed As Days/weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Total Delivered, Days/weeks/months 1. Floor Mounted Air Condition: Outdoor + Indoor Floor Standing With Free 37369 Yh-103 Air Purifier Power: 4.0 Hp Cooling Capacity: 36,000 – 38,000 Btu/hr Compressor: Rotary Eer: 12.5 Cooling Area: 36-50sqm Power Supply: 220v/1ph/60hz With Existing Service Center With Warranty With Free Delivery And Installation 4 Unit Of ________________________ Signature Over Printed Name Technical Specifications Item 1 Specification Floor Mounted Air Condition: Outdoor + Indoor Floor Standing With Free 37369 Yh-103 Air Purifier Power: 4.0 Hp Cooling Capacity: 36,000 – 38,000 Btu/hr Compressor: Rotary Eer: 12.5 Cooling Area: 36-50sqm Power Supply: 220v/1ph/60hz With Existing Service Center With Warranty With Free Delivery And Installation Brand Name Statement Of Compliance Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] __________________________ Signature Over Printed Name Schedule Of Warranty This Serves As Warranty For Purchase Of Four (4) Unit Of Aircon Floor Mounted In The Government Of Barangay Tetuan. Item No. Description Quantity Warranty 1 Floor Mounted Air Condition: Outdoor + Indoor Floor Standing With Free 37369 Yh-103 Air Purifier Power: 4.0 Hp Cooling Capacity: 36,000 – 38,000 Btu/hr Compressor: Rotary Eer: 12.5 Cooling Area: 36-50sqm Power Supply: 220v/1ph/60hz With Existing Service Center With Warranty With Free Delivery And Installation 4 Unit Of ___________________________ Bidder Signature Over Printed Name Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Office Equipment– Purchase Of Four Unit Of Aircon Floor Mounted B. Completed Within Ten (10) Years Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 “subcontracting Is Not Allowed.” 12 The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) At Cgso, Tetuan, Zamboanga City For This Project. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than P1,230.00; If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than P3, 075.00; If Bid Security Is In Surety Bond. 19.3 The Project Shall Be Awarded One Project Having Several Items That Shall Be Awarded As One Contract. 20.2 [list Here Any Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It.] 21.2 [list Here Any Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity.] Special Conditions Of Contract Gcc Clause 1 [list Here Any Additional Requirements For The Completion Of This Contract. The Following Requirements And The Corresponding Provisions May Be Deleted, Amended, Or Retained Depending On Its Applicability To This Contract:] Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: [for Goods Supplied From Abroad, State:] “the Delivery Terms Applicable To The Contract Are Ddp Delivered [indicate Place Of Destination]. In Accordance With Incoterms.” [for Goods Supplied From Within The Philippines, State:] “the Delivery Terms Applicable To This Contract Are Delivered Barangay Hall Of Tetuan, Zamboanga City. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is [indicate Name(s)]. Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: Select Appropriate Requirements And Delete The Rest. A. Performance Or Supervision Of On-site Assembly And/or Start-up Of The Supplied Goods; B. Furnishing Of Tools Required For Assembly And/or Maintenance Of The Supplied Goods; C. Furnishing Of A Detailed Operations And Maintenance Manual For Each Appropriate Unit Of The Supplied Goods; D. Performance Or Supervision Or Maintenance And/or Repair Of The Supplied Goods, For A Period Of Time Agreed By The Parties, Provided That This Service Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And E.training Of The Procuring Entity’s Personnel, At The Supplier’s Plant And/or On-site, In Assembly, Start-up, Operation, Maintenance, And/or Repair Of The Supplied Goods. F. [specify Additional Incidental Service Requirements, As Needed.] The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Spare Parts – The Supplier Is Required To Provide All Of The Following Materials, Notifications, And Information Pertaining To Spare Parts Manufactured Or Distributed By The Supplier: Select Appropriate Requirements And Delete The Rest. A. Such Spare Parts As The Procuring Entity May Elect To Purchase From The Supplier, Provided That This Election Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And B.in The Event Of Termination Of Production Of The Spare Parts: I.advance Notification To The Procuring Entity Of The Pending Termination, In Sufficient Time To Permit The Procuring Entity To Procure Needed Requirements; And Ii.following Such Termination, Furnishing At No Cost To The Procuring Entity, The Blueprints, Drawings, And Specifications Of The Spare Parts, If Requested. The Spare Parts And Other Components Required Are Listed In Section Vi (schedule Of Requirements) And The Cost Thereof Is Included In The Contract Price. The Supplier Shall Carry Sufficient Inventories To Assure Ex-stock Supply Of Consumable Spare Parts Or Components For The Goods For A Period Of Three (3) Months. If Not Used Indicate A Time Period Of Three Times The Warranty Period]. Spare Parts Or Components Shall Be Supplied As Promptly As Possible, But In Any Case, Within [insert Appropriate Time Period] Months Of Placing The Order. Packaging – The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. The Packaging, Marking, And Documentation Within And Outside The Packages Shall Comply Strictly With Such Special Requirements As Shall Be Expressly Provided For In The Contract, Including Additional Requirements, If Any, Specified Below, And In Any Subsequent Instructions Ordered By The Procuring Entity. The Outer Packaging Must Be Clearly Marked On At Least Four (4) Sides As Follows: Name Of The Procuring Entity Name Of The Supplier Contract Description Final Destination Gross Weight Any Special Lifting Instructions Any Special Handling Instructions Any Relevant Hazchem Classifications A Packaging List Identifying The Contents And Quantities Of The Package Is To Be Placed On An Accessible Point Of The Outer Packaging If Practical. If Not Practical The Packaging List Is To Be Placed Inside The Outer Packaging But Outside The Secondary Packaging. Transportation – Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip, Or Ddp, Transport Of The Goods To The Port Of Destination Or Such Other Named Place Of Destination In The Philippines, As Shall Be Specified In This Contract, Shall Be Arranged And Paid For By The Supplier, And The Cost Thereof Shall Be Included In The Contract Price. Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Goods Are To Be Transported On Carriers Of Philippine Registry. In The Event That No Carrier Of Philippine Registry Is Available, Goods May Be Shipped By A Carrier Which Is Not Of Philippine Registry Provided That The Supplier Obtains And Presents To The Procuring Entity Certification To This Effect From The Nearest Philippine Consulate To The Port Of Dispatch. In The Event That Carriers Of Philippine Registry Are Available But Their Schedule Delays The Supplier In Its Performance Of This Contract The Period From When The Goods Were First Ready For Shipment And The Actual Date Of Shipment The Period Of Delay Will Be Considered Force Majeure. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Intellectual Property Rights – The Supplier Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 2.2 [if Partial Payment Is Allowed, State] “the Terms Of Payment Shall Be As Follows: _____________.” 4 The Inspections And Tests That Will Be Conducted Are: Quality Inspection By Accounting, Coa, Cgso And End User. Republic Of The Philippines) City Of _____________________ ) S.s Bid Securing Declaration Invitation To Bid No.: [insert Reference Number] To: Government Of Barangay Tetuan, Bids And Awards Committee M. Natividad Street, Tetuan Zamboanga City I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid Securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f),of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: A. Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; B. I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And; C. I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ___ Day Of [month][year] At [place Of Execution]. [insert Name Of Bidder Or Its Authorized Representative [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Latest Rules On Notarial Practice] Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, Barabgay Council Of Tetuan Wishes To Receive Bids For The Purchase Of Four (4) Unit Aircon Floor Mounted (pr. No. 24-10-127a) With Tetuan 24-0005 The Procurement Project (referred To Herein As “project”) Is Composed Of, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For The Capital Outlay Under The Office Equipment 2024 In The Amount Of Four Hundred Eigthy Four Thousand Pesos (p484, 000.00) Only. 2.2. Nga, The General Appropriations Act Or Special Appropriations. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2.b Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. B. For The Procurement Of Expendable Supplies: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty-five Percent (25%) Of The Abc. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts The Procuring Entity Has Prescribed That: Subcontracting Is Not Allowed. 8. Pre-bid Conference 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within Ten (10) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In E. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In Section Vii (technical Specifications). 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2. Payment Of The Contract Price Shall Be Made In Philippine Pesos. 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty Days [120]. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On November 25, 2024 At 10:00 Am At Barangay Hall, Conference Room, M. Natividad St., Zamboanga City As Indicated In Paragraph 6 Of The Ib. 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids On November 28, 2024 At 10:00 Am At Barangay Hall, Conference Room, M. Natividad St., Zamboanga City As Specified In Paragraph 8 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded One Project Having Several Items That Shall Be Awarded As One Contract. 19.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20. Post-qualification 20.2. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds.
Closing Date16 Jan 2025
Tender AmountPHP 1 Million (USD 17.1 K)
BARANGAY TETUAN, ZAMBOANGA CITY Tender
Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Philippines
Details: Description Republic Of The Philippines Barangay Tetuan Bids And Awards Committee Tetuan 24-0021 M. Nativitad, St., Zamboanga City Invitation To Bid For Supply And Delivery Of 1 Lot Various Disaster Equipment (name Of Project) 1. The City Government Of Zamboanga, Through The Annual Budget 2024 Under Other Maintenance And Operarting Expenses (omoe) Intends To Apply The Sum Of Two Hundred Sixteen Thousand Three Hundred Fifty Pesos (p 216,350.00) Only Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Supply And Delivery Of The Purchase Of One (1) Lot Various Disaster Equipment Pr No. 24-06-069 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The City Government Of Zamboanga Now Invites Bids For The Supply And Delivery Of The 1 Lot Various Disaster Equipment The Sol. Goods Is Required By Ten (10) Calendar Days Bidders Should Have Completed Within A Period Of Ten (10) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project, With A Value Of At Least (50%) Of The Abc And To Meet Other Eligibility Requirements Stated In The Eligibility Documents. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Prospective Bidders May Obtain Further Information From Barangay Hall Of Tetuan In The Office Of The Bids And Awards Committee And Inspect The Bidding Documents At The Address Given Below During 8:00 Am To 5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 03-08, 2025 From The Given Address And Website/s Below And Upon Payment Of A Non-refundable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of P500.00the Method Of Payment Will Be Cash Payable To The Barangay City Treasurer’s Office. The Bidding Documents Shall Be Received Personally By The Prospective Bidder Or His/her Authorized Representative. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees “machine Copy Of The Official Receipt” Not Later Than The Submission Of Their Bids. 6. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission On Or Before January 09, 2025 At 10:00 Am At Office Of The Bids And Award Committee, Conference Room, M. Natividad St., Zamboanga City.late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. All Bids Must Be Accompanied By A Bid Security Which Shall Be A Bid Securing Declarationor At Least One Other Form Of The Following: Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Confirmed By A Universal/commercial Bank, Irrevocable Letter Of Credit Issued By A Universal/commercial Bank Or From Other Bank Certified By The Bangko Sentral Ng Pilipinas As Authorized To Issue Such Financial Instrument, Provided However That It Shall Be Confirmed Or Authenticated By A Universal/commercial Bank If Issued By A Foreign Bank In The Amount Of P1,230.00or Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security In The Amount Of P3,075.00or Any Combination Of The Foregoing In The Amount Proportionate To Share Of Form With Respect To Total Amount Of Security. The Bid Security Shall Be Denominated In Philippine Pesos And Posted In Favor Of The Procuring Entity. Bidders Are Required To Indicate The Brand Name And/or Name Of Manufacturer Of Goods Offered/quoted, When Appropriate. 8. Bid Opening Shall Be On January 13, 2025 At 10:00 Am At Office Of The Bids And Awards Committee, Conference Room, M. Natividad St., Zamboanga City. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend The Activity. 9. To Be Delivered In The Barangay Hall Of Tetuan. 10. The Brangay Council Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules Or Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. Bidders Are Advised To Use The Bid Form At The Back Of This Itb. Failure To Do So Would Lead To Non-acceptance Of The Bid. 12. For Further Information Please Refer To: Hazel Jane L. Fox Bac Secretariat Barangay Government Of Tetuan M.natividad Street, Zamboanga City Brgytetuan@gmail.com Tel. No. (063) 993-0269 Republic Of The Philippines Barangay Tetuan Bids And Awards Committee Tetuan 24-0021 M. Natividad Street, Zamboanga City Bid Form Date: ____________________ To: Barangay Council Of Tetuan Address: M. Natividad Zamboanga City Having Examined The Philippine Bidding Documents (pbds) Including The Supplemental Or Bid Bulletin Numbers Including Bid Bulletin Numbers Tetuan 24-0021 The Receipt Of Which Is Hereby Duly Acknowledge, We, The Undersigned, Offer To Supply/deliver/perform The Delivery And Supply Of The 1 Lot Various Disaster Equipment Inconformity With The Said Philippine Bidding Documents (pbds) For The Sum Of (total Bid Amount In Words And Figures) Or The Total Calculated Bid Price, As Evaluated And Corrected For Computational Errors, And Other Bid Modifications In Accordance With The Price Schedules Attached Herewith And Made Part Of This Bid. The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: [specify The Applicable Taxes, E.g. (i) Value Added Tax (vat), (ii) Income Tax’ (iii) Local Taxes, And (iv) Other Fiscal Levies And Duties], Which Are Itemized Herein Or In The Price Schedules, If Our Bid Is Accepted, We Undertake: A. To Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements Of The Philippine Bidding Documents (pbds); B. To Provide A Performance Security In The Form, Amounts, And Within The Times Prescribed In The Pbds; C. To Abide By The Bid Validity Period Specified In The Pbds And It Shall Remain Binding Upon As At Any Time Before The Expiration Of That Period. [insert This Paragraph If Foreign-assisted Project With The Development Partner: Commissions Or Gratuities, If Any, Paid, Paid Or To Be Paid By Us To Agents Relating To This Bid, And To Contract Execution If We Are Awarded The Contract, Are Listed Below: Name And Address Amount And Purpose Of Agent Currency Commission Or Gratuity (if None, State “none”)] Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And Your Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Bid You May Receive. We Certify/confirm That We Comply With The Eligibility Requirements Pursuant To The Pbds. The Undersigned Is Authorized To Submit The Bid On Behalf Of ________________________________________________________ (name Of Bidder) As Evidenced By The Attached ______________________________________________________________________. (state The Written Authority) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Attached Schedule Of Prices, Shall Be A Ground For The Rejection Of Our Bid. Name: _________________________________________________________________________ Legal Capacity: __________________________________________________________________ Signature: ______________________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: _________________________________________ Date:__________________________ Price Schedule For Goods Name Of Bidder _____________________________________________________ Tetuan 24-0021 Page 1 Of 1 2 3 4 5 6 7 8 9 10 Item 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. Life Boat Ring Rescue Can With Harness Rescuer’s Throw Bag Rescuer Shovel Rescue Rope 12mmx 50mm Rescue Rope 12 Mm X 100mm Rescue Rain Coat Rescue Booths Big First Aid Kit Rechargeable Flashlights Chainsaw 7m’ Breathable Reflectorized Vest Safety Helmet Safety Glasses Megaphone Fire Extinguisher Small First Aid Kit 4x4 Tent Ambulance Collapsible Stretcher Adult Wheelchair Solar Flood Light 300w Country Of Origin Quantity 2 2 1 2 2 2 10 10 4 10 1 10 4 4 2 4 11 4 1 4 12 Unit Price Exw Per Item Transportation And All Other Costs Incidental To Delivery, Per Item Sales And Other Taxes Payable If Contract Is Awarded, Per Item Cost Of Incidental Services, If Applicable, Per Item Total Price, Per Unit (col 5+6+7+8) Total Price Delivered Final Destination (col.9) X (col 4) Purpose: For Barangay Tetuan Disaster Preparedness Name: _________________________________________________________________________ Legal Capacity: __________________________________________________________________ Signature: ______________________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: ________________________________________ Date: ________________________________ Schedule Of Requirements The Delivery Schedule Expressed As Days/weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Total Delivered, Days/weeks/months ________________________ Signature Over Printed Name Technical Specifications Brand Name Statement Of Compliance Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] __________________________ Signature Over Printed Name Schedule Of Warranty This Serves As Warranty For _______________________________________________ In The Barangay Government Of Tetuan. Item No. Description Quantity Warranty _____________________________ Bidder Signature Over Printed Name Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Supply / Delivery Of The 1 Lot Various Disaster Equipment B. Completed Within Ten (10) Years Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 “subcontracting Is Not Allowed.” 12 The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) At Cgso, Tetuan, Zamboanga City For This Project . 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than P1,230.00; If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than P3, 075.00; If Bid Security Is In Surety Bond. 19.3 The Project Shall Be Awarded One Project Having Several Items That Shall Be Awarded As One Contract. 20.2 [list Here Any Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It.] 21.2 [list Here Any Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity.] Special Conditions Of Contract Gcc Clause 1 [list Here Any Additional Requirements For The Completion Of This Contract. The Following Requirements And The Corresponding Provisions May Be Deleted, Amended, Or Retained Depending On Its Applicability To This Contract:] Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: [for Goods Supplied From Abroad, State:] “the Delivery Terms Applicable To The Contract Are Ddp Delivered [indicate Place Of Destination]. In Accordance With Incoterms.” [for Goods Supplied From Within The Philippines, State:] “the Delivery Terms Applicable To This Contract Are Delivered Barangay Hall Of Tetuan, Zamboanga City. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is [indicate Name(s)]. Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: Select Appropriate Requirements And Delete The Rest. A. Performance Or Supervision Of On-site Assembly And/or Start-up Of The Supplied Goods; B. Furnishing Of Tools Required For Assembly And/or Maintenance Of The Supplied Goods; C. Furnishing Of A Detailed Operations And Maintenance Manual For Each Appropriate Unit Of The Supplied Goods; D. Performance Or Supervision Or Maintenance And/or Repair Of The Supplied Goods, For A Period Of Time Agreed By The Parties, Provided That This Service Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And E.training Of The Procuring Entity’s Personnel, At The Supplier’s Plant And/or On-site, In Assembly, Start-up, Operation, Maintenance, And/or Repair Of The Supplied Goods. F. [specify Additional Incidental Service Requirements, As Needed.] The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Spare Parts – The Supplier Is Required To Provide All Of The Following Materials, Notifications, And Information Pertaining To Spare Parts Manufactured Or Distributed By The Supplier: Select Appropriate Requirements And Delete The Rest. A. Such Spare Parts As The Procuring Entity May Elect To Purchase From The Supplier, Provided That This Election Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And B.in The Event Of Termination Of Production Of The Spare Parts: I.advance Notification To The Procuring Entity Of The Pending Termination, In Sufficient Time To Permit The Procuring Entity To Procure Needed Requirements; And Ii.following Such Termination, Furnishing At No Cost To The Procuring Entity, The Blueprints, Drawings, And Specifications Of The Spare Parts, If Requested. The Spare Parts And Other Components Required Are Listed In Section Vi (schedule Of Requirements) And The Cost Thereof Is Included In The Contract Price. The Supplier Shall Carry Sufficient Inventories To Assure Ex-stock Supply Of Consumable Spare Parts Or Components For The Goods For A Period Of Three (3) Months. If Not Used Indicate A Time Period Of Three Times The Warranty Period]. Spare Parts Or Components Shall Be Supplied As Promptly As Possible, But In Any Case, Within [insert Appropriate Time Period] Months Of Placing The Order. Packaging – The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. The Packaging, Marking, And Documentation Within And Outside The Packages Shall Comply Strictly With Such Special Requirements As Shall Be Expressly Provided For In The Contract, Including Additional Requirements, If Any, Specified Below, And In Any Subsequent Instructions Ordered By The Procuring Entity. The Outer Packaging Must Be Clearly Marked On At Least Four (4) Sides As Follows: Name Of The Procuring Entity Name Of The Supplier Contract Description Final Destination Gross Weight Any Special Lifting Instructions Any Special Handling Instructions Any Relevant Hazchem Classifications A Packaging List Identifying The Contents And Quantities Of The Package Is To Be Placed On An Accessible Point Of The Outer Packaging If Practical. If Not Practical The Packaging List Is To Be Placed Inside The Outer Packaging But Outside The Secondary Packaging. Transportation – Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip, Or Ddp, Transport Of The Goods To The Port Of Destination Or Such Other Named Place Of Destination In The Philippines, As Shall Be Specified In This Contract, Shall Be Arranged And Paid For By The Supplier, And The Cost Thereof Shall Be Included In The Contract Price. Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Goods Are To Be Transported On Carriers Of Philippine Registry. In The Event That No Carrier Of Philippine Registry Is Available, Goods May Be Shipped By A Carrier Which Is Not Of Philippine Registry Provided That The Supplier Obtains And Presents To The Procuring Entity Certification To This Effect From The Nearest Philippine Consulate To The Port Of Dispatch. In The Event That Carriers Of Philippine Registry Are Available But Their Schedule Delays The Supplier In Its Performance Of This Contract The Period From When The Goods Were First Ready For Shipment And The Actual Date Of Shipment The Period Of Delay Will Be Considered Force Majeure. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Intellectual Property Rights – The Supplier Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 2.2 [if Partial Payment Is Allowed, State] “the Terms Of Payment Shall Be As Follows: _____________.” 4 The Inspections And Tests That Will Be Conducted Are: Quality Inspection By Accounting, Coa, Cgso And End User. Republic Of The Philippines) City Of _____________________) S.s Bid Securing Declaration Invitation To Bid No.: [insert Reference Number] To: Barangay Government Of Tetuan, Bids And Awards Committee M. Natividad Street, Tetuan Zamboanga City I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid Securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f),of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: A. Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; B. I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And; C. I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ___ Day Of [month][year] At [place Of Execution]. [insert Name Of Bidder Or Its Authorized Representative [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Latest Rules On Notarial Practice] Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, Barangay Council Of Tetuan Wishes To Receive Bids For The Supply And Delivery Of The 1 Lot Various Disaster Equipment With Tetuan 24-0021 The Procurement Project (referred To Herein As “project”) Is Composed Of The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For The Annual Budget 2024 Under The Other Maintenance And Operating Expenses (omoe) In The Amount Of Two Hundred Sixteen Thousand Three Hundred Fifty Pesos ( 216,350.00) 2.2. Nga, The General Appropriations Act Or Special Appropriations. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2.b Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. B. For The Procurement Of Expendable Supplies: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty-five Percent (25%) Of The Abc. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts The Procuring Entity Has Prescribed That: Subcontracting Is Not Allowed. 8. Pre-bid Conference No Pre-bid Conference 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within Ten (10) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In E. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In Section Vii (technical Specifications). 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2. Payment Of The Contract Price Shall Be Made In Philippine Pesos. 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty Days [120]. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On January 09, 2025 At 10:00 Am At Barangay Hall, Conference Room, M. Natividad St., Zamboanga City As Indicated In Paragraph 6 Of The Ib. 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids On January 13, 2024 At 10:00 Am At Barangay Hall, Conference Room, M. Natividad St., Zamboanga City As Specified In Paragraph 8 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded One Project Having Several Items That Shall Be Awarded As One Contract. 19.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20. Post-qualification 20.2. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds.
Closing Date13 Jan 2025
Tender AmountPHP 216.3 K (USD 3.7 K)
DEPT OF THE NAVY USA Tender
Others
United States
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|mil-i-45208|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a||||||
inspection System Program Plans, Or Premanufacturing Or Test Procedures|1|45|
contract Definitization (may 2023)|5|a Firm Fixed Price Purchase Order|firm Fixed Price|repair T&e Proposal: Not To Exceed 90 Days After Award Of Purchase Order Definitization Not To Exceed 180 Days After Award Of Purchase Order|firm Fixed Price|tbd|
limitation Of Government Liability (apr 1984)|2|tbd|tbd|
federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12|||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
small Business Program Representations (feb 2024)|4|||x||
annual Representations And Certifications (may 2024)|13|333998|700||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
if You Have Questions Concerning This Rfq, Please Contact The P.o.c. Carly
gassert, Ph 717-605-5693, Fax 717-605-1569, Email:carly.a.gassert.civ@us.navy.mil
note: This Request For Quotation (rfq) Is Being Issued Only To Open, Inspect
and Evaluate The Subject Item(s) Required To Be Repaired. After Receipt Of
your Quotation, A Contract Will Be Issued, And The Item(s) Needing Repaired
will Be Shipped To Your Company For Opening, Inspection And Evaluation.
unless Otherwise Specified, Your Quotation Is Valid For 60 Days.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,
delivery Orders) And Modifications Related To The Instant Procurement Are
considered To Be 'issued' By The Government When Copies Are Either Deposited
in The Mail, Transmitted By Facsimile, Or Sent By Other Electronic Commerce
methods, Such As Email. The Government's Acceptance Of The Contractor's
proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As
detailed Herein.
with Your Quote For Teardown And Evaluation Pricing, Please Provide The Following Additional Information:
repair Turn Around Time (rtat) Defined As Induction Start Date To End/final Delivery Date (in Days).
throughput Constraint Defined As Total Assets To Be Repaired Monthly After Initial Delivery Commences. A Throughput Of 0000/month Reflects No Throughput Constraint.
1. Scope
1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence.
1.2 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Filter Element Flui .
2. Applicable Documents
2.1 Applicable Documents;
The Individual Repair Parts Ordering Data, (irpod) Is Located In Section "k" Of The Contract/purchase Order As An Attachment.
2.2 Not Releasable To Foreign Nationals (noforn) Distribution Statement - Drawings, Specification, Or Related Technical Documents As Cited In The Irpod Are Subject To Special Export Controls And Each Transmittal To Foreign Govern Ments Or Foreign Nationals May
be Made Only With Prior Approval Of The Naval Sea Systems Command.
2.3 Applicable Documents;
technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At
(https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To
the Award.
this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator.
drawing Data=820-2177935 |53711| | |c| | | |
drawing Data=820-4383862 |07107| | |f| | | |
drawing Data=820-4383863 |07107| | |c| | | |
drawing Data=820-4383864 |07107| | |c| | | |
drawing Data=820-4383865 |07107| | |c| | | |
drawing Data=820-4383866 |07107| | |c| | | |
drawing Data=820-4383867 |07107| | |c| | | |
3. Requirements
3.1 Navsup Wss-mech Code N94 Additional Technical Documentation
order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004
a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of
any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows:
1. Amendments To The Purchase Order/contract
2. Schedule Of Supplies Of The Purchase Order/contract.
3. Terms And Conditions Of The Purchase Order/contract.
4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable.
5. Any Invoked Standard Technical Requirements (strs).
6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable.
7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable.
b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents:
1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval
for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided.
2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later.
c. Use Of Document Revisions In Their Entirety:
1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document).
d. Vendor Waiver/deviations On Critical Contracts.
1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected.
2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation
is Submitted Or Prior To Manufacture.
3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With
your Request.
4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or
replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation.
5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided.
6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within
five Working Days After Receipt.
e. Exclusion Of Mercury
1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract.
4. Quality Assurance
4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod) As An Attachment To The Contract/purchase Order.
the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein.
records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract.
5. Packaging
5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts
applies.
(1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing,
and Marking.
requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc.
(a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States,
"components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)".
(2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply:
(a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other
requirements Identified Within The Irpod.
the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods.
(b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements
for The Use Of Green Poly Bags, Then They Are Required And Take Precedence.
(4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From:
contracting Officer
navsup Wss-mech
code N943
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On
post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document.
2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents.
6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
6.3 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s)
Which Are Part Of The Total Requirement Of The Contract/purchase
Order.
block C: Is The Category Of Data Required, Tdp Is Defined
In Mil-t-31000. Tm Is Defined In Part 1x, Section B
Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's
Included In Our Solicitations Meet The Requirement Of Tdp As
Navsup-wss Does Not Regularly Purchase Only Technical Manuals
Without Purchasing Hardware And Related Tdp Software. Therefore,
Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item
Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number,
Invitation For Bid Number Or Another Number For Tracking And
Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The
Individual Who Prepared The Dd Form 1423 And Included The
Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content
And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If
The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual
Technical Manual Contract Requirements Number. In The Event
The Dd Form 1423 Is Requiring A Technical Manual The Numbered
Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement
Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval,
Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And
Acceptance Of The Deliverable Item. The Definition Of The
Codes Is As Follows:
Dd Form 250 Code Inspection Acceptance
Ss (1) (2)
Dd (3) (4)
Sd (1) (4)
Ds (3) (5)
Lt (6) (7)
No (8) (8)
Xx (9) (9)
(1) Inspection At Source.
(2) Acceptance At Source.
(3) No Inspection Performed At Source. Final Inspection
Performance At Destination.
(4) Acceptance At Destination.
(5) Acceptance At Source. Acceptance Based On Written
Approval From The Contract Officer.
(6) Letter Of Transmittal Only. Lt Should Not Be Used When
Inspection Is Required. The Data Is Sent By The
Contractor Directly To The Personnel Listed In Block 14
Of The Dd Form 1423. Lt Is Used When The Contracting
Agency Does Not Desire To Have A Dd Form 250 For Each
And Every Piece Of Data Developed By The Contractor.
The Only Other Authorized Use Of Lt Is The Special
Case Where The Contracting Agency Does Not Desire To
Have Separate Dd Forms 250 But Desires To Have A
Government Quality Assurance Representative Perform
Inspection. The Government Quality Assurance
Representative Shall Be Listed On The Distribution
In Block 14 And Requested To Provide Comments Via
The Quality Assurance Letter Of Inspection.
Use Of The Symbol Lt Is Not Authorized For Data Comprising
Final Delivery Of Technical Data Package Of For Technical
Manuals. (lt May, However, Be Used For Delivery Of
Preliminary Tdp's Or Tm's).
(7) As Specified In Block 8 Of The Dd Form 1423.
(8) No Inspection Or Acceptance Required. No Dd Form 250 Or
Letter Of Transmittal Required.
Use Of The Symbol No Is Not Authorized For Data Comprising
Technical Data Packages Or For Technical Manuals.
(9) Inspection And Acceptance Requirements Specified Elsewhere
In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring
Specific Advanced Written Approval Prior To Distribution Of
The Final Data Item Will Be Identified By Placing An "a"
In This Field. This Data Item Requires Submission Of A
Preliminary Draft Prior To Publication Of A Final Document.
When A Preliminary Draft Is Required, Block 16 Of The Dd
Form 1423 Will Show Length Of Time Required For Government
Approval/disapproval And Subsequent Turn-around Time For The
Contractor To Resubmit The Data After Government
Approval/disapproval Has Been Issued. Block 16 Will Also
Indicate The Extent Of The Approval Requirements, E.g.,
Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The
Government Can Circulate The Deliverable Item. The Definition
Of Codes A, B, C, D, E, Or F Is As Follows:
A. Distribution Of The Item Is Unrestricted.
B. Distribution Of The Item Is Limited To Agencies Only.
C. Distribution Of The Item Is Limited To Contractors With
A Cage Code And Have A Dd Form 2345 On File With The
Dla Logistics Information Services (dlis) Battle Creek,
Mich. Or Government Activities.
D. Distribution Of The Item Is Limited To Dod Activities
And Dod Contractors Only.
E. Distribution Of The Item Is Limited To Dod Components
Only.
F. Distribution Of The Item Is Restricted From Foreign
Nations And Foreign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To
Be Delivered To The Government. The Abbreviations And
Their Meaning.
Annly Annually
Asgen As Generated
Asreq As Required
Bi-mo Every Two Months
Bi-we Every Two Weeks
Daily Daily
Dfdel Deferred Delivery
Mthly Monthly
One/r One Time With Revisions
Qrtly Quarterly
Semia Every Six Months
Wekly Weekly
Xtime Number Of Times To Be Submitted
(1time, 2times...9times)
Use Of These Codes Requires Further Explanation In Block 16
To Provide The Contractor With Guidance Necessary To Accurately
Price The Deliverable Data Item.
Other Abbreviations Not Appearing On The Above List May On
Occasion Be Used In Block 10 Of The Dd Form 1423. When Other
Abbreviations Are Used They Will Be Fully Explained In Block 16
Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day
Format, The Deliverable Item Is To Be Received By The
Requiring Office Cited In Block 6 Of The Dd Form 1423
For An Item With A Block 10 Entry Indication A Single
Delivery. If The Item Is To Be Submitted Multiple
Times, The Number Stated Is The Number Of Calendar Days
After The Frequency Cited In Block 10 The Item Is To Be
Received By The Requiring Office Cited In Block 6 Of The
Dd Form 1423. On Occasion The Deliverable Item Will Be
Required To Be Submitted Prior To The End Of The Frequency
Cited In Block 6. In That Event The Requirement Will Be
Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To
The Requiring Office (block 4) Expressed In
Year/month/day Format. The Abbreviations And Their
Meaning Are As Follows:
Asgen As Generated
Asreq As Required
Dac Days After Contract Date
Dfdel Deferred Delivery
Eoc End Of Contract
Eom End Of Month
Eoq End Of Quarter
Specific Instructions For These Requirements Will Be Provided In
Block 16. If The Deliverable Item Is Constrained By A Specific
Event Or Milestone The Constraint Will Be Fully Explained In Block 16
Of The Dd Form 1423. "as Generated", "as Required", And "deferred
Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After
The Initial Submission. Subsequent Submission Is Only Used To
Indicate The Specific Time Period. The Data Is Required When
Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is
Required. This Does Not Apply To Resubmission Of A Deliverable
Item That Has Been Reviewed By The Requiring Office And Determined
To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To
Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full
Name, Address (including Code) Will Be Specified. That Specific
Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To
Be Submitted. When Final "repro" Copies Are To Be Submitted
Block 16 Will Clarify The Type Of Repro Copies Required.
(e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required
By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information
Blocks 1 Through 15. This Block Is Also The Only Area Used To
Tailor The Document Listed In Block 4. Only Deletions To The
Minimum Requirements Stated In The Document In Block 4 Are
Allowed. Block 16 May Also Be Used To Specify The Medium For
Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offeror Is To Enter The
Appropriate Price Group. The Price Groups Are Defined As Follows:
A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This
Type Of Data To Perform The Rest Of The Contract. Price
Would Be Based On Identifiable Direct Costs, Overhead, General
And Administrative (g&a) And Profit.
B. Group Ii - Data Essential To Contract Performance Which Must Be
Reworked Or Amended To Conform To Government Requirements.
The Price For Data In This Group Would Be Based On The Direct
Cost To Convert The Original Data To Meet Government Needs And
To Deliver It, Plus Allocable Overhead, G&a And Profit.
C. Group Iii - Data Which The Contractor Must Develop For His Own
Use And Which Requires No Substantial Change To Conform To
Government Requirements Regarding Depth Of Content, Format,
Frequency Of Submittal, Preparation, And Quality Of Data. Only
The Costs Of Reproducing, Handling And Delivery, Plus Overhead,
G&a And Profit, Are Considered In Pricing Data In This Group.
D. Group Iv - Data Which The Contractor Has Developed As Part
Of His Commercial Business. Not Much Of This Data Is Required
And The Cost Is Insignificant. The Item Should Normally
Be Coded "no Charge." An Example Is A Brochure Or Brief Manual
Developed For Commercial Application Which Will Be Acquired
In Small Quantities, And The Added Cost Is Too Small To Justify
The Expense Of Computing The Charge That Otherwise Would Go
With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total
Price Which Is Estimated To Be Attributable To The Production
Or Development For The Government Of That Item Of Data. The
Entry "n/c" For "no Charge" Is Acceptable.
tagand Mark The Packaging Of Each Assembly With A Note Stating "this Assembly Meets The Cleanliness Requirements Of Mil-std-767". Clean Per Mil Std 767.packaging And Pack Per Mil Prf 23199, Greenpoly Bags Req. After Packaging,in The Greennpoly The Item Shall Be
placed In A Second Watervapor Proof Bag, Then Placed Cushioned To Prevent Movement And Placed In The Rigid Box.
mark The Packaging Label With The Nomenclature:
element Assy
in Lieu Of:
filter Element Flui
\
date Of First Submission=045 Dac
submit For Approval One Package (iaw Di-qcic-8871) Of All Applicable Procedure, Drawing And Other Pre-manufacturing Submittals, Listed On The Individual Repair Part Ordering Data (irpod) Document(s) And Detailed In The Cited Specification, Within 45 Days After
contract Award To The Contracting Officer (navsup-wss Code N9433). See Irpod For Individual Documents Required.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8871 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Procedure Package To Be Iaw Did Di-qcic-8871(latest Rev).
date Of First Submission=eoc
submit To Navsup-wss, Code N9433 For Review, A Complete Package Of All Applicable Vendor Certified Reports Of Test And Inspection Per Di-qcic-8872(latest Rev) See (individual Repair Parts Ordering Data) Irpod For Individual Documentsrequired.
the Package Will Be Submitted Per The Contract Delivery Schedule, And Authorization To Ship Material Must Be Obtained From The Pco.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8872s Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Roti Package To Be Iaw Did Di-qcic-8872(latest Rev).
date Of First Submission=030 Dac
submit For Approval One Package In Accordance With Di-qcic-8874 Which Identifies The Lower Tier Suppliers Of Material, Supplies And Services.
package Shall Be Submitted Within 45 Days After Contract Award To The Contracting Officer, Navsup-wss, Code N9433.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8874 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Report Package To Be Iaw Did Di-qcic-8874(latest Rev).
Closing Date17 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|tbd|n/a|tbd|tbd|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|mil-i-45208|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
inspection System Program Plans, Or Premanufacturing Or Test Procedures|1|45|
equal Opportunity (sep 2016)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12|||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13|332919, 750|||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332919|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
subject To Contractor Meeting All Aspects Of Appendix A To Lsc-2e.
the Following Applies If Reports Of Test And Inspection (roti) Are Required:
the Recommended Method For Roti Submittals Is Via Wawf Or An Alternative High Quality Electronic Means (ie: Fax Or Email Your Post Award Poc Listed Above). A Dedicated Roti Fax Has Been Added For Your Submittal Convenience.
a Material Irpod Is Available At The Bpmi Site. Vendor Review Of The Irpod Is Mandatory.
unless Otherwise Specified, Pricing For This Quotation Is Valid For 60 Days After The Closing Date As Indicated On The Quotation. Please Specify (if Other Than 60 Days) ______________ Days. If You Are Submitting Your Quote Via Email Or Neco, Please Specify The
number Of Days Pricing Is Valid.
All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein.
\
1. Scope
1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence.
2. Applicable Documents
2.1 Not Releasable To Foreign Nationals (noforn) Distribution Statement - Drawings, Specification, Or Related Technical Documents As Cited In The Irpod Are Subject To Special Export Controls And Each Transmittal To Foreign Govern Ments Or Foreign Nationals May
be Made Only With Prior Approval Of The Naval Sea Systems Command.
2.2 Applicable Documents;
technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At
(https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To
the Award.
this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator.
3. Requirements
3.1 Navsup Wss-mech Code N94 Additional Technical Documentation
order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004
a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of
any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows:
1. Amendments To The Purchase Order/contract
2. Schedule Of Supplies Of The Purchase Order/contract.
3. Terms And Conditions Of The Purchase Order/contract.
4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable.
5. Any Invoked Standard Technical Requirements (strs).
6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable.
7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable.
b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents:
1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval
for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided.
2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later.
c. Use Of Document Revisions In Their Entirety:
1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document).
d. Vendor Waiver/deviations On Critical Contracts.
1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected.
2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation
is Submitted Or Prior To Manufacture.
3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With
your Request.
4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or
replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation.
5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided.
6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within
five Working Days After Receipt.
e. Exclusion Of Mercury
1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract.
4. Quality Assurance
4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod).
the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein.
records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract.
5. Packaging
5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts
applies.
(1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing,
and Marking.
requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc.
(a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States,
"components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)".
(2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply:
(a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other
requirements Identified Within The Irpod.
the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods.
(b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements
for The Use Of Green Poly Bags, Then They Are Required And Take Precedence.
(4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From:
contracting Officer
navsup Wss-mech
code N943
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On
post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document.
2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents.
6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
6.3 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s)
Which Are Part Of The Total Requirement Of The Contract/purchase
Order.
block C: Is The Category Of Data Required, Tdp Is Defined
In Mil-t-31000. Tm Is Defined In Part 1x, Section B
Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's
Included In Our Solicitations Meet The Requirement Of Tdp As
Navsup-wss Does Not Regularly Purchase Only Technical Manuals
Without Purchasing Hardware And Related Tdp Software. Therefore,
Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item
Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number,
Invitation For Bid Number Or Another Number For Tracking And
Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The
Individual Who Prepared The Dd Form 1423 And Included The
Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content
And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If
The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual
Technical Manual Contract Requirements Number. In The Event
The Dd Form 1423 Is Requiring A Technical Manual The Numbered
Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement
Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval,
Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And
Acceptance Of The Deliverable Item. The Definition Of The
Codes Is As Follows:
Dd Form 250 Code Inspection Acceptance
Ss (1) (2)
Dd (3) (4)
Sd (1) (4)
Ds (3) (5)
Lt (6) (7)
No (8) (8)
Xx (9) (9)
(1) Inspection At Source.
(2) Acceptance At Source.
(3) No Inspection Performed At Source. Final Inspection
Performance At Destination.
(4) Acceptance At Destination.
(5) Acceptance At Source. Acceptance Based On Written
Approval From The Contract Officer.
(6) Letter Of Transmittal Only. Lt Should Not Be Used When
Inspection Is Required. The Data Is Sent By The
Contractor Directly To The Personnel Listed In Block 14
Of The Dd Form 1423. Lt Is Used When The Contracting
Agency Does Not Desire To Have A Dd Form 250 For Each
And Every Piece Of Data Developed By The Contractor.
The Only Other Authorized Use Of Lt Is The Special
Case Where The Contracting Agency Does Not Desire To
Have Separate Dd Forms 250 But Desires To Have A
Government Quality Assurance Representative Perform
Inspection. The Government Quality Assurance
Representative Shall Be Listed On The Distribution
In Block 14 And Requested To Provide Comments Via
The Quality Assurance Letter Of Inspection.
Use Of The Symbol Lt Is Not Authorized For Data Comprising
Final Delivery Of Technical Data Package Of For Technical
Manuals. (lt May, However, Be Used For Delivery Of
Preliminary Tdp's Or Tm's).
(7) As Specified In Block 8 Of The Dd Form 1423.
(8) No Inspection Or Acceptance Required. No Dd Form 250 Or
Letter Of Transmittal Required.
Use Of The Symbol No Is Not Authorized For Data Comprising
Technical Data Packages Or For Technical Manuals.
(9) Inspection And Acceptance Requirements Specified Elsewhere
In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring
Specific Advanced Written Approval Prior To Distribution Of
The Final Data Item Will Be Identified By Placing An "a"
In This Field. This Data Item Requires Submission Of A
Preliminary Draft Prior To Publication Of A Final Document.
When A Preliminary Draft Is Required, Block 16 Of The Dd
Form 1423 Will Show Length Of Time Required For Government
Approval/disapproval And Subsequent Turn-around Time For The
Contractor To Resubmit The Data After Government
Approval/disapproval Has Been Issued. Block 16 Will Also
Indicate The Extent Of The Approval Requirements, E.g.,
Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The
Government Can Circulate The Deliverable Item. The Definition
Of Codes A, B, C, D, E, Or F Is As Follows:
A. Distribution Of The Item Is Unrestricted.
B. Distribution Of The Item Is Limited To Agencies Only.
C. Distribution Of The Item Is Limited To Contractors With
A Cage Code And Have A Dd Form 2345 On File With The
Dla Logistics Information Services (dlis) Battle Creek,
Mich. Or Government Activities.
D. Distribution Of The Item Is Limited To Dod Activities
And Dod Contractors Only.
E. Distribution Of The Item Is Limited To Dod Components
Only.
F. Distribution Of The Item Is Restricted From Foreign
Nations And Foreign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To
Be Delivered To The Government. The Abbreviations And
Their Meaning.
Annly Annually
Asgen As Generated
Asreq As Required
Bi-mo Every Two Months
Bi-we Every Two Weeks
Daily Daily
Dfdel Deferred Delivery
Mthly Monthly
One/r One Time With Revisions
Qrtly Quarterly
Semia Every Six Months
Wekly Weekly
Xtime Number Of Times To Be Submitted
(1time, 2times...9times)
Use Of These Codes Requires Further Explanation In Block 16
To Provide The Contractor With Guidance Necessary To Accurately
Price The Deliverable Data Item.
Other Abbreviations Not Appearing On The Above List May On
Occasion Be Used In Block 10 Of The Dd Form 1423. When Other
Abbreviations Are Used They Will Be Fully Explained In Block 16
Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day
Format, The Deliverable Item Is To Be Received By The
Requiring Office Cited In Block 6 Of The Dd Form 1423
For An Item With A Block 10 Entry Indication A Single
Delivery. If The Item Is To Be Submitted Multiple
Times, The Number Stated Is The Number Of Calendar Days
After The Frequency Cited In Block 10 The Item Is To Be
Received By The Requiring Office Cited In Block 6 Of The
Dd Form 1423. On Occasion The Deliverable Item Will Be
Required To Be Submitted Prior To The End Of The Frequency
Cited In Block 6. In That Event The Requirement Will Be
Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To
The Requiring Office (block 4) Expressed In
Year/month/day Format. The Abbreviations And Their
Meaning Are As Follows:
Asgen As Generated
Asreq As Required
Dac Days After Contract Date
Dfdel Deferred Delivery
Eoc End Of Contract
Eom End Of Month
Eoq End Of Quarter
Specific Instructions For These Requirements Will Be Provided In
Block 16. If The Deliverable Item Is Constrained By A Specific
Event Or Milestone The Constraint Will Be Fully Explained In Block 16
Of The Dd Form 1423. "as Generated", "as Required", And "deferred
Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After
The Initial Submission. Subsequent Submission Is Only Used To
Indicate The Specific Time Period. The Data Is Required When
Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is
Required. This Does Not Apply To Resubmission Of A Deliverable
Item That Has Been Reviewed By The Requiring Office And Determined
To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To
Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full
Name, Address (including Code) Will Be Specified. That Specific
Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To
Be Submitted. When Final "repro" Copies Are To Be Submitted
Block 16 Will Clarify The Type Of Repro Copies Required.
(e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required
By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information
Blocks 1 Through 15. This Block Is Also The Only Area Used To
Tailor The Document Listed In Block 4. Only Deletions To The
Minimum Requirements Stated In The Document In Block 4 Are
Allowed. Block 16 May Also Be Used To Specify The Medium For
Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offeror Is To Enter The
Appropriate Price Group. The Price Groups Are Defined As Follows:
A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This
Type Of Data To Perform The Rest Of The Contract. Price
Would Be Based On Identifiable Direct Costs, Overhead, General
And Administrative (g&a) And Profit.
B. Group Ii - Data Essential To Contract Performance Which Must Be
Reworked Or Amended To Conform To Government Requirements.
The Price For Data In This Group Would Be Based On The Direct
Cost To Convert The Original Data To Meet Government Needs And
To Deliver It, Plus Allocable Overhead, G&a And Profit.
C. Group Iii - Data Which The Contractor Must Develop For His Own
Use And Which Requires No Substantial Change To Conform To
Government Requirements Regarding Depth Of Content, Format,
Frequency Of Submittal, Preparation, And Quality Of Data. Only
The Costs Of Reproducing, Handling And Delivery, Plus Overhead,
G&a And Profit, Are Considered In Pricing Data In This Group.
D. Group Iv - Data Which The Contractor Has Developed As Part
Of His Commercial Business. Not Much Of This Data Is Required
And The Cost Is Insignificant. The Item Should Normally
Be Coded "no Charge." An Example Is A Brochure Or Brief Manual
Developed For Commercial Application Which Will Be Acquired
In Small Quantities, And The Added Cost Is Too Small To Justify
The Expense Of Computing The Charge That Otherwise Would Go
With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total
Price Which Is Estimated To Be Attributable To The Production
Or Development For The Government Of That Item Of Data. The
Entry "n/c" For "no Charge" Is Acceptable.
the Packaging Label Shall Be Marked With The Nomenclature Cited On The Irpod.
date Of First Submission=045 Dac
submit For Approval One Package (iaw Di-qcic-8871) Of All Applicable Procedure, Drawing And Other Pre-manufacturing Submittals, Listed On The Individual Repair Part Ordering Data (irpod) Document(s) And Detailed In The Cited Specification, Within 45 Days After
contract Award To The Contracting Officer (navsup-wss Code N9433). See Irpod For Individual Documents Required.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8871 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Procedure Package To Be Iaw Did Di-qcic-8871(latest Rev).
date Of First Submission=eoc
submit To Navsup-wss, Code N9433 For Review, A Complete Package Of All Applicable Vendor Certified Reports Of Test And Inspection Per Di-qcic-8872(latest Rev) See (individual Repair Parts Ordering Data) Irpod For Individual Documentsrequired.
the Package Will Be Submitted Per The Contract Delivery Schedule, And Authorization To Ship Material Must Be Obtained From The Pco.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8872s Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Roti Package To Be Iaw Did Di-qcic-8872(latest Rev).
date Of First Submission=045 Dac
submit For Approval One Package Iaw Di-qcic-8874 Which Identifies The Lower Tier Suppliers Of Material, Supplies And Services.
this Package Shall Be Submitted Within 45 Days After Contract Award To The Contracting Officer, Navsup-wss, Code N9433.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8874a Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Roti Package To Be Iaw Did Di-qcic-8874(latest Rev).
Closing Date9 Jan 2025