Printing Tenders
Printing Tenders
Caraga Regional Hospital Tender
Healthcare and Medicine
Philippines
Closing Date8 Jan 2025
Tender AmountPHP 5.2 Million (USD 91.2 K)
Details: Description Republic Of The Philippines Department Of Health Caraga Regional Hospital Surigao City Ooooooooo @@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@ Bids And Awards Committee Invitation To Bid Ib No. 2024-01-08 (117) Supply And Delivery Of Various Hemodialysis Supplies Under Single-year Framework Agreement ( Early Procurement Activity ) Approved Budget For The Contract: Php 5,298,140.00 ========================================================= 1. The Caraga Regional Hospital (crh), Through The Fy2025 Raf / Gaa Intends To Apply The Sum Of Being The Approved Budget For The Contract (abc) Of Five Million Two Hundred Ninety Eight Thousand One Hundred Forty Pesos Only ( Php 5,298,140.00 ) As To Payment Under The Contract For Supply And Delivery Of Various Hemodialysis Supplies Under Single-year Framework Agreement (early Procurement Activity). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening And Items Below Are Subject For A Competitive Bidding As Framework Agreement List. This Is A Lot Bid. Item No Description Qty Unit Of Measure Unit Cost Total Cost Lot 1 Hd Sterilant 1.1 50% Citric Acid Solution 5l, Buffer 3000 Gal 1,532.00 ₱4,596,000.00 Classification: Organic Acid Hazardous Substance: Citric Acid %(w/w) 50-52 Physical Data Appearance: Clear To Hazy Yellow Odor: Charactieristic Ph: 1.00-1.30 1,2 Peracitic Acid Sterilant 24 Gal 6,240.00 ₱149,760.00 1. Appearance: Colorless Or Pale Yellow Clear Aqueous Solution 2. Active Ingredients: Peracetic Acid: 4% Hydrogen Peroxide: 20% Acetic Acid: 10% 3. Odor: Acetic Acid Odor 4. Water-solubility: Dissolves Regardless The Ratio 5. Storage Stability: 18 Months At Normal Temperature Total ₱4,745,760.00 Lot 2 Hd Supplies 2.1 Gauze 4x4 70 Box 180.00 ₱12,600.00 4”x 4” 8 Ply 24 X 28 Mesh 100 Pads/pack 2.2 Syringe 10cc With Needle G21 70 Box 210.00 ₱12,250.00 Smooth And Double Plunger X 100/box 2.3 Syringe Dispo 5cc W/ G12/g23 70 Box 270.00 ₱18,900.00 Needle, Sharpest Needle, Polyprolene Barrel, Non-toxic Double Plunger, Smooth Movement Of Plunger, Thermoplastic Elastometer Gasket, Clear Prints On The Syringe, Luerlock, Undergone High Internsity Sterilization 100/box 2.4 Hardness Test Strips 100’s /bottle 10 Bottle 2,280.00 ₱ 22,800.00 Total ₱72,780.00 Lot 3 Hemodialysis Chemical Analysis Test 3.1 Chemical Water Analysis 4 Test 13,200.00 ₱52,800.00 (every 6 Months Of Test) 3.2 Chlorine Test Strips, 100s/bottle 10 Bottle 2,280.00 ₱22,800.00 Total Chlorine Range: 0 - 25- 50 - 200 - 500 - 800 - 1500 - 2000 Ppm 3.3 Peracetic Potency Strips 100 Strips/bottle 20 Bottle 3,000.00 ₱60,000.00 Concentrations Of Peracetic Acid At Or Below 400 Ppm Will “fail” And Concentrations At Or Above 800 Ppm Will “pass” With The Guardian Peracetic Acid Test Strips. 3.4 Peracetic Residual Strips 100 Strips/bottle 80 Bottle 1,800.00 ₱144,000.00 Concentrations Of Renalin In Dialyzer At Or Below 400 Ppm Will “fail” And Concentrations At Or Above 800 Ppm Will “pass” With The Guardian Peracetic Residual Test Strips. 3.5 Residual Peroxide Test Strips 100 Strips/bottle 80 Bottle 2,500.00 ₱200,000.00 A Semi-quantitative Procedure Provides The Hydrogen Peroxide Concentration Between 0 And 10 Ppm Comparing The Reacted Indicator Pad Color To The Color Chart On The Bottle Label. Color Blocks Represent Peroxide Concentrations Of 0, 1, 3, 5 And 10 Ppm. Total ₱479,600.00 Grand Total ₱5,298,140.00 Terms Of Reference Bidders Must Submit The Following During Post-qualification: 1 Samples If Offered Item Is Not Previously Procured Or If Required By The Procuring Entity 2 Brochures Indicating Specification 3 Terms Of Delivery: 15 Calendar Days Upon Receipt Of Call-off 4 Delivery Schedule: Upon Call Off 5 This Procurement Is Under Framework Agreement -single Year Framework Agreement 6 Terms Of Payment. Payment Shall Be Made Upon Complete Delivery Per Call – Off. Necessary Documents Are Required In Compliance With Auditing Rules And Regulations. 7 This Procurement Is Lot Bid – Single Lot And Awarded In One Contract. Bidder Shall Bid All The Items In A Lot. 8 Product Expiration Date Must Be At Least 6 Months To 1 Year From Date Of Delivery 9 Validity Of The Contract / Contract Termination 10 Without Prejudice To The Provision Of Applicable Laws, Rules And Guidelines, The Contract Shall Be Automatically Terminated Under The Following Conditions: 11 A. When The Total Quantity Specified In The Contract Has Been Exhausted Within A Single Year 12 B. For Any Justifiable Reason Ground Where The Contract Will Not Redound To The Benefit Of The Government Or There Is Violation Of The Contract. 13 Repeat Order: 14 1. No Repeat Order For An Item In Contract Being Awarded Shall Be Allowed Until After The Procuring Entity Has Exhausted The Estimated Quantity For The Same Item Specified Therein Or After The Contract Has Expired, Whichever Comes First, And Subject To The Conditions Provided In Section 51 Of Ra 9184 And Its Irr. For This Purpose, The Repeat Order Shall Be Availed Of Only Within Six (6) Months From The Date Of The Last Of Final Delivery Order Contract For A Specific Item Where The Estimated Quantity Has Been Exhausted, Or The Expiration Of The Contract. 15 2. In Case Repeat Order Is Allowed And Resorted To, The Twenty-five (25%) Maximum Allowable Quantity Shall Be Based On The Aggregate Quantity Of Actual Items Ordered And Delivered. 16 General Conditions 17 All Other Rules Governing Contract Implementation And Termination Under Ra 9184 And Its Irr, And Relevant Procurement Policies Shall Be Applicable. Technical Specification And Terms Of Reference Are Hereby Posted In Philgeps And Form An Integral Part Of This Invitation To Bid. 2. The Crh Now Invites Bids For The Procurement Of The Above-captioned Project. Delivery Of The Goods Is Required Within The Period Specified Under Section Vi (schedule Of Requirements). Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. Section 23.4.1.3.(ra 9184). The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty Five Percent ( 25% ) Of The Abc. Slcc Must Be Within 2 Years From The Submission Of Bids. (based On The Completion Date). The Single Largest Completed Contract (slcc) Must Pertain To Hemodialysis Supplies Or Medical Supplies Or A Similar In Nature, As Determined And Defined By The Bids And Awards Committee ( Bac ). For Procurement Where The Procuring Entity Has Determined, After The Conduct Of Market Research, That Imposition Of Either (a) Or (b) Will Likely Result To Failure Of Bidding Or Monopoly That Will Defeat The Purpose Of Public Bidding: The Bidder Should Comply With The Following Requirements: A. Completed At Least Two (2) Similar Contracts, The Aggregate Amount Of Which Should Be Equivalent To At Least Fifty Percent (50%) In The Case Of Non-expendable Supplies And Services Or Twenty-five Percent (25%) In The Case Of Expendable Supplies] Of The Abc For This Project; And B. The Largest Of These Similar Contracts Must Be Equivalent To At Least Half Of The Percentage Of The Abc As Required Above. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Nondiscretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee (bac) Secretariat, Caraga Regional Hospital, Surigao City And Inspect The Bidding Documents At The Address Given Above During 8:00 Am – 5:00 Pm, Monday To Friday. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 5, 2024 To January 08. 2025 On Or Before 10:00 A.m. From The Address Above And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Specified Below: Bidding Schedule Pre-bidding Conference December 16, 2024 At 9:00 A.m. Via Zoom Platform Link: Join Zoom Meeting Https://us06web.zoom.us/j/81682739663?pwd=qqb1jfgbvatdpssxch8hafbtcco9la.1 Meeting Id: 816 8273 9663 Passcode: 096095 Deadline Of Submission Of Bids January 08, 2025 At 10:00 A.m... Via Online And Submit Your Bidding Documents To This Email Address: Crhbac2020@gmail.com. Please Be Advised That Failure To Submit Bidding Documents To The Designated Official Email Address Will Result In Automatic Rejection And Disqualification. Opening Of Bids January 08, 2025 At 3:30 P.m. Via Zoom Platform Join Zoom Meeting Https://us06web.zoom.us/j/81337163910?pwd=ebqw909boftdzawx99jcu3wwqolsvo.1 Meeting Id: 813 3716 3910 Passcode: 242132 Complete Philippine Bidding Documents Please Click The Link Below: Https://drive.google.com/drive/folders/1gabl1vzoiuixzohvqrmu8ftjpo6f1hc1?usp=sharing Amount Of Bidding Documents: Lot 1: Php 5,000.00 Lot 2: Php 500.00 Lot 3: Php 500.00 The Above Payment Of Bidding Documents Is Only Applicable To Those Bidders That May Opt To Participate In Only 1 Or 2 Lots Out Of The 3 Lots. Bidders Who May Participate In All Of The Lots Shall Pay The Amount Of Php 10,000.00 Payment Of The Bidding Documents Is Non-refundable . It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. The Following Phlippine Bidding Documents Can Be Accessed In The Philgeps And All Form And Part Of This Invitation To Bid, To Wit: A. Technical Specification / Terms Of Reference/ List Of Items B. Instruction To Bidders: B.1. Documents To Be Submitted (checklist- This Will Be Discussed During The Pre-bid Conference) B.2. Memorandum Of Undertaking – Provision Thereof Is Strictly Implemented C. Guidelines On The Conduct Of The Electronic Submission And Receipt Of Bids By The Procuring Entity – Caraga Regional Hospital (crh) D. Philippine Bidding Documents E. Framework Agreement Guidelines F. Framework Agreement Lists F. Other Documents Essential Documents Required By This Procuring Entity And Ra 9184 6. The Crh Will Hold A Pre-bid Conference On The Above-mentioned Date, Time And Venue, Which Shall Be Opened To Prospective Bidders. The Pre-bidding Conference And Opening Of Bids Shall Be Conducted Through Videoconferencing, Webinar Or Virtual. Please Send Your Intent To Participate To Our Email Address As Provided Below. 7. Bids Must Be Duly Received By The Bac Secretariat At Via Designated Email On Or Before January 08, 2025 At 10:00 O’clock In The Morning. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bid Opening Shall Be On January 08, 2025 At 3:30 O’clock In The Afternoon At The Bac Conference Room, Beside Procurement Office, Caraga Regional Hospital, Rizal Street, Surigao City As Virtual / Electronic Bidding Via Zoom Platform. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Above. Late Bids Shall Not Be Accepted Under Any Circumstances May It Cause. 8. Furthermore, The Standard Philippine Bidding Document (pbd) Is Form And Part Of This Invitation In Accordance To Ra 9184 And Other Applicable Laws, Rules And Policy. 9. The Crh Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. The Opening And Receipt Of Bids Is Strictly Implemented Through Electronic Submission. Given The Covid-19 Pandemic, Procurement Activity Has Been Expedient And One Of This Is The Conduct Of Electronic Submission Of Bids. The Crh Thru The Bids And Awards Committee (bac) Has Submitted Certification, Certified By The Highest Official Managing The Information Technology, Describing The Electronic System Or Procedure To Be Used By The Crh For The Electronic Submission And Receipts Of Bids And A Statement That The Same Is Compliant With The Gppb Resolution No. 12-2020 Requirements. 11. Bidding Documents Shall Be Emailed To This Email Address, With Activated Password To: Crhbac2020@gmail.com. You May Deposit On Line For The Payment Of The Bidding Documents To This Account Below: Bank Name: Land Bank Of The Philippines Account Name: Caraga Regional Hospital-trust Fund Account Number: 0982 -1288 – 70 12. Furthermore Deposit Slip Shall Be Submitted Via Email To: Crhprocurement.bac@gmail.com 13. The Procuring Entity Will No Longer Accept Nor Entertain Any Form Of Bids Submission Except Electronic. Failure To Comply Electronic Submission Will Be Immediately Disqualified. Guideline On The Electronic Submission Is Hereby Attached. 14. Join The Caraga Regional Hospital Supplier Network By Filling Out The Registry Form From This Link : Https://bit.ly/crh_suppliersregistry 15. For Further Information, Please Inquire To: Bac Secretariat Caraga Regional Hospital. Rizal Street, Surigao City Tel. Nos. (086) 826-1575 Local 194 Direct Line: (086) 826-9058 Mobile Nos. 09850508783 (smart/tnt) 09539212832 (globe/tm) E-mail Address: Crhprocurement.bac@gmail.com Approved By: (sgd) Atty. Ma. Flordelin T. Ensomo, Cpa Attorney Iv Chairman, Bids And Awards Committee
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date13 Jan 2025
Tender AmountRefer Documents
Description: Contact Information|4|n792.10|t2q|215-697-9948|kimberly.flores12.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|x||||||||
inspection And Acceptance Of Supplies|26|x||||||||||||x||||||||||||||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving (combo) Type||tbd|n00383|tbd|tbd|see Schedule|tbd|||||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|12 Months|60 Days After Discovery Of Defect.|||||
warranty Of Data - Basic (mar 2014)|2|||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
first Article Approval--government Testing (sep 1989)|7||||||||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
limitation Of Liability--high-value Items (feb 1997)|1||
limitations On Pass-through Charges (jun 2020)|1||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
annual Representations And Certifications (may 2024)|12|336413|1250|||||||||||
facsimile Proposals (oct 1997)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x|
evaluation Of First Article Testing|3||||
this Solicitation Is For Made New Manufacture Spare Parts.
the Government Intends To Make A Single Award To The Eligible, Responsible,technically Acceptable Offeror Whose Offer, Conforming To The Solicitation, Isdetermined Most Advantageous To The Government, Price, Capacity, And Deliveryconsidered.
navsup Wss Requests Proposals Submitted In Response To This Solicitation Remain Valid For A Minimum Of 120 Days Following Submission.
all Contractual Documents Related To The Instant Procurement Are Considered Tobe "issued" By The Government When Copies Are Either Deposited In The Mail,transmitted By Facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Governments
acceptance Of The Contractors Proposal Constitutes
bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
\
1. Scope
1.1 . Markings Shall Be In Accordance With Mil-std-130.
1.2 Pre-award / Post Award Requirements:
due To The Critical Use Of This Item And Its Quality History, A Pre-award Survey And Post-award Conference May Be Required For All New Manufacturers. For All Previous Sources, A Post-award Conference May Be Recommended.
1.3 The Components Being Acquired Under This Solicitation Have Been Classified As Flight Critical Requiring Engineering Source Approval By The Naval Air Systems Command. Only Those Companies Who Have Submitted Requests For Source Approval And Been Approved
will Be Eligible For Award Under This Solicitation. Any Company Not Previously Approved May Submit A Source Approval Request To The Contracting Officer, Naval Inventory Control Point, (see Block 10 Of The
sf33 For Name And Code). The Source Approval Request Shall Contain The Following Documentation And Shall Be Submitted By The Closing Date Of This Solicitation:
(a) Copy Of Complete Configuration Drawings For A Similar Item(s) Which Your Company Has Produced Within The Past Three Years, Including Test Procedures For Which Your Company (1) Has Been Qualified To Manufacture And (2) Which Is Similar, I.e., Requires The
same Materials, Manufacturing Processes, Inspections, Tolerances And Similar Application As The Item(s) For Which You Are Seeking Approval.
(b) Copy Of The Complete Process/operation Sheets Used To Manufacuture The Similar Item, Including But Not Limited To, Detailed Shop Sketches. These Plans Must Note Those Operations And Processes Performed By Subcontractors/ Vendors.
(c) Complete Copies Of Purchase Orders, Shipping Documents, Etc. That Document Delivery Of Production Quantities Of The Part To The Original Equipment Manufacturer Or Military Service. Provide The Most Recent Copies Of The Documents.
(d) A Detailed Comparative Analysis Of The Differences/similarities Between The Similar Part And The Part(s) For Which You Are Seeking Approval. This Analysis Should Include Materials, Configuration, Tolerances, Process Requirements, Dimensions, Castings,
forgings, Etc.
(e) Copy Of Inspection Method Sheets Used In The Manufacturing And At Final Inspection. These Sheets Should Include Actual Tolerance, Print Requirements, Inspection Devices, Sources Performing The Operation And Level Of Inspection. Critical Characteristics
should Be Discernible From All Other Characteristics.
the Above Requirements Are A Subset Of Requirements Specified In The Aso
source Approval Information Brochure Dated January 1995. The Submission Of This Data Subset Is Contingent Upon And In Consideration Of The Submitting Contractor Meeting All Other Requirements Specified In This Solicitation To Include A Bilateral Agreement With
mda Which Includes Availability Of Complete Data, Mrb Disposition, Etc. Any Company Not Having Such Agreement, But Desiring To Seek Engineering Source Approval, Will Be Required To Submit Data Meeting All Requirements Of The Aso/navicp Source Approval
brochure.
1.4 Sampling Rates (aqls) Indicated Below Shall Be Used In Accordance With
ansi Z1.4 For Single Sampling And A General Inspection Level Of Ii.
1.5 In Addition To The 100% Pco Mandatory, Critical And Major Characteristics,
attributes For Plating, Hardness And Non-destructive Testing Will Be Inspected
one Hundred Percent.
1.6 Contractor Shall Develop A System For Identification Of Individual
piece Parts For Traceability Purposes. Markings Shall Not Be Permanent.
1.7 An Aql Of 1.5 Will Be Used For Class 3 Threads And Dimensions, And
geometric Feature Controls With A Tolerance Range Of .010 Or Less.
1.8 For Minor Characteristics, A Sampling Rate Determined By The Contractor
and Subject To Qar Approval Will Be Used.
1.9 The Material Covered In This Contract/purchase Order Will Be Used In A
crucial Shipboard System Enabling The Launch And/or Recovery Of Aircraft. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In A Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems Or Loss Of Aircraft. Therefore,the Material Has Been
designated As Critical Material And Special Control Procedures Are Invoked
to Ensure Receipt Of Correct Material.
1.10 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;nawc Lakehurst; Drawing Number ( ;80020; ) ;510872-2; , Revision ;n; And All Details And Specifications Referenced Therein.
1.11 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not
be Provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced
specification.
1.12 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c.
2. Applicable Documents
drawing Data=b408573 |80020| F| |a| | | |
drawing Data=mpr 1221 |80020| T| |d| | | |
drawing Data=mpr 1222 |80020| A| |d| | | |
drawing Data=mpr 1223 |80020| C| |d| | | |
drawing Data=323195 |80020| E| |a| | | |
drawing Data=323196 |80020| E| |a| | | |
drawing Data=416328 |80020| G| |a| | | |
drawing Data=416330 |80020| C| |d| | | |
drawing Data=416332 |80020| C| |a| | | |
drawing Data=418772 |80020| D| |a| | | |
drawing Data=420340 |80020| D| |d| | | |
drawing Data=510875 |80020| F| |c| | | |
drawing Data=511224 |80020| J| |d| | | |
drawing Data=514822 |80020| M| |d| | | |
drawing Data=514823 |80020| G| |d| | | |
drawing Data=514824 |80020| G| |d| | | |
3. Requirements - Not Applicable
4. Quality Assurance
unique Requirements:
1. All Records Pertaining To Alre Csi/cai Manufacture And Inspection/test Shall Be Provided To The Alre Cognizanttechnical Authority. All Records Shall Be Maintained By Lke Qa And By The Manufacturer For A Period Of Seven Years.
2. Interim Inspection Requirements: The Following Item(s) Requires An Interim Inspection At The Contractor's Location:
a. Pn 514822-1, Hook (csi):
i. Witness Of Magnetic Particle Inspection Of Area "x" And Section "d-d" Of Drawing 514822 Prior To Chromium Plating.
ii. Witness Of Dimensional Inspection In Area "x" And Section "d-d" Of Drawing 514822 Prior To Chromium Plating.
iii. Witness Of Hardness Testing In Area "x" And Section "d-d" Of Drawing 514822 Prior To Chromium Plating.
3. Alre Csi Parts Require Certification:
a. When Certified, An Alre Part Is Marked With A Material Identification Code (mic). Nawcadlke Qa Will Provide The Mic To Dcma If The Component Is Source Accepted, And After Receipt Of All Associated Data. Application Of Mic Shall Be In The Same Methodology As
the Drawing Note For Part Marking, And In Same Area As Part Marking (next To, Above, Or Below).
4. Receipt Inspection And Certification Of Sub-components:
a. P/n 514822-1 Shall Be Certified At Lakehurst.
5. Receipt Inspection And Certification Of The Top Assembly:
a. The Receipt Inspection And Certification Of The Top Assembly, P/n 510872-2, Shall Occur At Lakehurst During The Final Inspection.
6. Contractor Assist And Part Marking:
a. The Contractor Shall Assist On The Conduct Of The Inspections (both Final And Interim) Required That Are Necessary To Certify The Critical Items Specified Herein. The Contractor Shall Provide Adequate Facilities, Inspection Equipment, And Skilled Personnel,
to Support The Nawcadlke Inspector In The Conduct Of The Interim Inspection(s). The Contractor Shall Provide Gauges, Tools, Fixtures, And Jigs Necessary To Perform The Inspections. The Contractor Shall Also Provide Sufficient Rigging/material Handling Services
and Manpower To Setup/configure/operate Equipment & Machines Used To Accomplish The Inspection Task. This Contractor Assist Requirement Shall Be Applicable To 100% Of The Production Quantities. As Part Of The Mri Process, The Nawcadlke Qa Representative Will
provide, In Writing, A Certification Number Along With Direction For Marking The Critical Safety Item (csi).
quality Assurance Requirements
1. The Solicitation/contract Shall Contain The Nawcadlke Inspection Surveillance Clause As Follows:
a. N/a
b. Due To The Critical Nature Of This Item, It Is Necessary To Conduct In-process Inspections On Critical Component Features, Attributes, Or Manufacturing Processes. The Contractor Agrees To Notify Roy Janney, Roy.a.janney.civ@us.navy.mil, Of The Nawc Qa
section Code, Bl41600, Lakehurst, Nj 08733-5035 And The Pco When Material Is Scheduled For The Interim Inspection(s) That Are Identified Herein. This Notice Shall Afford The Nawcadlke Qa Representative The Option Of Being Present During The Inspection. A
minimum Of Seven (7) Working Days Is Required To Arrange The Surveillance Visit. Notification Shall Include The Following Information: Company Name, Cage Code, Phone Number, Fax Number, Contract Number, Point Of Contact, Part Nomenclature,part Number, Niin,
type Of Inspection, And Quantity Of Parts.
2. The Contractor Shall Perform Quality Conformance And Lot Sampling Inspection For All Associated Features That Are Present In The Drawings And Specifications:
a. Features/attributes/requirements Classified As Critical And Major On The Drawing(s) Or Within The Technical Specification Shall Be Inspected And Shall Have The Actual Dimensions Documented 100%;
b. Attributes For Plating, Hardness, And Non-destructive Testing Shall Be Inspected 100%;
c. Class 3 Threads, Dimensions, And Geometric Feature Controls With A Tolerance Range Of .010 Or Less Shall Be Inspected Using An Aql Of 1.5 And The General Inspection Level Ii As Defined By Ansi Z1.4.
d. Minor Characteristics: Sampling Shall Be Inspected Using An Aql Of 4.0 And The General Inspection Level Ii As Defined By Ansi Z1.4.
3. The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System Supporting The Launch And/or Recovery Of Aircraft. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In A Serious
personnel Injury, Loss Of Life, Loss Of Vital Shipboard Systems, Or Loss Of Aircraft. Therefore, The Material Has Been Designated As Critical Safety Item (csi) Material And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
4. First Article Testing:
a. First Article Testing By The Government Is Required For This Item Of Alre/se.
b. First Article Samples, All Certifications, Test Reports, And In-process Inspection Documents Needed To Substantiate Product Quality Shall Be Forwarded To The Naval Air Warfare Center Aircraft Division, Code Bl41600 B148, Hwy #547, Lakehurst, Nj 08733-5125
(attention: Drew Flast).
c. First Article Samples Will Be Evaluated Within 45 Working Days After The Date Of Receipt For Sample Quantities.
d. First Article Sample Quantities Is 1 (one); Delivered In The Uncoated Condition. First Article Results And Disposition Recommendations Will Be Provided To The Pco Via Letter.
e. Estimated Test Costs Are $5000.
5. Production Lot Special Tests: N/a
6. For Purposes Of This Tdr, The Term Ndt Shall Refer To The Following Methods: Mt - Magnetic Particle Testing, Pt - Penetrant Inspection, Ut - Ultrasonic Testing, Rt - Radiographic Testing, And Vt - Visual Testing.
7. Companies Performing Ndt Shall Be Nadcap Accredited, Or A Laboratory Accredited By One Of The Organizations Listed Below As Satisfying Iso 17025 (general Requirements For The Competence Of Testing And Calibration Laboratories). Ndt Certificates Shall Be Bear
the Symbols Of Accreditation And The Accreditation Body.
a. American Association For Laboratory Accreditation (a2la)
b. Ansi National Accreditation Board (anab)
c. International Accreditation Service, Inc (ias)
d. National Voluntary Laboratory Accreditation Program (nvlap)
e. Perry Johnson Laboratory Accreditation, Inc (pjla)
f. Canadian Association For Laboratory Accreditation Inc. (cala)
g. Standards Council Of Canada (scc)
4.1 Review Documentation As Provided Under Dd 1423 Requirements.
4.2 Critical Manufacturing Processes
( ;applies; ) Heat Treat
( ;applies; ) Welding
( ;n/a; ) Cadmium Plating
( ;n/a ; ) Engineering Chrome Plating
( ;applies; ) Nickel Chrome Plating
( ;n/a; ) Casting(s)
( ;n/a; ) Forging(s)
( ;applies; ) Mpr (material Processing Requirements)
4.3 The Test To Be Performed Under The First Article Approval Clause (far 52.209-3) Of The Contract Are Listed Below
4.3.1 Dimensional Test (special) ;close Machine Tolerances.;
4.3.2 Requirements Of: ;lke Drawing Package;
4.3.3 Form ;applies;
4.3.4 Fit ;n/a;
4.3.5 Function ;n/a;
4.3.6 Compliance With Drawing ( ;80020; ) ;510872; , Revision ;rev N ; And Specifications Referenced Therein.
4.4 In Addition To The Above Tests, The First Article(s) To Be Inspected Hereunder Shall Also Be Subjected To Those Tests Which Will Demonstrate That The Article(s) Comply With The Contract Requirements
4.5 The Contractor Shall Be Responsible For Providing The Necessary Parts And Repair Of The First Article Sample(s) During Inspection
4.6 The Contractor Shall Notify The Pco, Aco, And Qar Fourteen (14) Days Prior To Conducting The First Article Test So That The Government May Witness Such Testing.
4.6.1 The Qar Shall Be Present To Witness All First Article Testing.
4.6.2 The Following Additional Personnel Shall Witness The First Article Testing: ;roy Janney Nawcadlke Qa / Tel: (732)-323-2834
e-mail: Roy.a.janney.civ@us.navy.mil;
4.7 Disposition Of Fat Samples
4.7.1 ;n/a; Sample(s) May Be Destroyed During Testing.
4.7.2 ;applies; Unless Otherwise Provided For In The Contract, Sample(s) Shall Remain At The Contractor And May Be Considered As Production Items Under The Contract Provided The Sample(s) Can Be Refurbished To Ready For Issue Condition And Provided The
sample(s) Have Inspection Approval Of The Cognizant Dcmc Qar. Sample(s) May Be Shipped As Production Items Only After All Other Units Required Under The Contract Have Been Produced And Are Ready For Shipment.
4.8 Test Sample Coating Instructions
4.8.1 Samples Are To Be Unpainted. Corrosive Areas Are To Be Coated With A Light Preservative If Required.
4.9 Notice To Government Of Testing At The Contractors Facility.
4.9.1 Far 52.209-3 Applies
(a) The Contractor Shall Present ;one; ; Unit(s) Of The Following Cage( ;80020; ; ), Part Number ;510872-2; ; , Revision ;rev N; ; As Specified In This Contract. At Least Fourteen (14) Calendar Days Before The Beginning Of The First Article Testing, The
contractor Shall Notify The Contracting Officer, In Writing, Of The Time And Location Of The Testing So That The Government May Witness The Tests.
(b) The Contractor Shall Submit The First Article Test Report Within 15 Calendar Days From The Date Of Testing To: ;pco; ;
the Contractor Shall Mark The Report "first Article Test Report" And Cite The Contract Number And Lot/item Number. Review Documentation As Provided Under The Dd1423 Requirements.
(c) Within 45 Calendar Days After The Government Inspects The First Article, The Contracting Officer Shall Notify The Contractor, In Writing, Of The Approval, Conditional Approval, Or Disapproval Of The First Article. The Notice Of Approval, Conditional
approval, Or Disapproval Shall Not Relieve The Contractor From Complying With All Requirements Of The Specifications And All Other Terms And Conditions Of This Contract. A Notice Of Conditional Approval Shall State Any Further Action Required Of The
contractor. A Notice Of Disapproval Shall Cite Reasons For Disapproval.
(d) If The First Article Is Disapproved, The Contractor, Upon Government Request Shall Repeat Any Or All First Article Tests. After Each Request For Additional Tests, The Contractor Shall Make Any Necessary Changes, Modifications, Or Repairs To The First
article Or Select Another First Article For Testing. All Costs Related To These Tests Are To Be Borne By The Contractor, Including Any And All Costs For Additional Tests Following A Disapproval. The Contractor Shall Then Conduct The Tests And Deliver Another
report To The Government Under The Terms And Conditions And Within The Time Specified In Paragraph B Above. The Government Reserves The Right To Require An Equitable Adjustment Of The Contract Price For Any Extension Of The Delivery Schedule Or For Any
additional Costs To The Government Related To These Tests.
(e) If The Contractor Fails To Present Any First Article On Time, Or The Contracting Officer Disapproves Any First Article, The Contractor Shall Be Deemed To Have Failed To Make Delivery Within The Meaning Of The Default Clause Of This Contract.
(f) Unless Otherwise Provided In The Contract, And If The Approved First Article Is Not Consumed Or Destroyed In Testing, The Contractor May Deliver The Approved First Article As Part Of The Contract Quantity If It Meets All Contract Requirements For
acceptance.
(g) If The Government Does Not Act Within The Time Specified In Paragraph (c) Above The Contracting Officer, Shall, Upon Timely Written Request From The Contractor, Equitably Adjust Under The Changes Clause Of This Contract The Delivery Or Performance Dates
and/or The Contract Price, And Any Other Contractual Term Affected By The Delay.
(h) Before First Article Approval, The Acquisition Of Materials Or Components For, Or The Commencement Of Production Or, The Balance Of The Contract Quantity Is At The Sole Risk Of The Contractor. Before First Article Approval, The Costs Thereof Shall Not Be
allocated To This Contract For 1) Progress Payments, Or 2) Termination Settlements If The Contract Is Terminated For The Convenience Of The Government. The Contractor Is Responsible For Providing Operating And Maintenance Instructions, Spare Parts, And Repair
of The First Article During Any First Article Test.
(i) The Contractor Shall Produce Both The First Article And The Production Quantity At The Same Facility And Shall Submit A Certification To The Effect With Each First Article.
(j) The Test Report (2 Copies) Shall Be In Accordance With Mil-std-831, Unless Otherwise Specified On The Dd1423, And Shall Be Submitted Via The Cognizant Dcmc To Navsup, Attn: (cite Name And Code In Block 10.a Of The Sf33). The Dcmc Shall Provide Comments On
form Dd1222 (2 Copies) Which Shall Be Forwarded With The Test Report. Approval Of The Test Report Is The Pco's Responsibility. Upon Notification Of Approval, Condition Approval, The Aco Shall Execute The Dd250 To Indicate Government Acceptance Of The Test
report.
4.10 Alternate Offers - Waiver Of First Article Approval Requirements. (the Following Provisions Supersede Any Waiver Of First Article Approval Requirements Terms Set Forth In Clause 52.209-3 Or 52.209-4 As Appropriate)
(a) Unless Otherwise Specified In The Solicitation, Navsup Wss Reserves The Right To Waive The First Article Approval Requirements Specified Herein For Offerors Who Have Previously Furnished Identical Production Articles Accepted By The Government Or The
original Equipment Manufacturer/prime Manufacturer. An Offeror Requesting Waiver Of First Article Requirements Shall Submit Evidence With Its Offer Establishing That:
(i) The Last Production Unit Was Delivered Within Three (3) Years Of The Issue Date Of This Solicitation, And
(ii) The Production Location To Be Used For This Requirement Is The Same As Used For The Previous Production Run.
additionally, The Offeror Shall Submit A Certification, To Be Executed By The Officer Or Employee For The Offer, Stating That:
(i) The Articles To Be Provided Will Be Produced Using The Same Facilities, Processes, Sequences Of Operations And Approved Subcontractors As Those Previously Delivered And Accepted By The Government Or The Original Equipment Manufacturer/prime Manufacturer,
and
(ii) The Previous Production Units Were Manufactured Without Material Review Board Disposition Or Waiver/deviation Request Or Rejection Of Pre-production Samples For Cause.
(note: This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States And The Making Of A False, Fictitious, Or Fraudulent Certification May Render The Maker Subject To Prosecution Under Title 18, United States
code, Section 1001.)
(b) Offerors Requesting Waiver Of First Article Approval Requirements Under The Provisions Of This Clause Are Cautioned To Submit Two Prices For Articles Required Herein - One That Is Based On Compliance With The First Article Approval Requirements And
one That Is Based On A Waiver Of Such Requirements. Where An Offeror Submits Only One Price And Fails To Clearly State That The Price Is Based On Waiver Of The First Article Approval Requirements It Will Be Deemed To Be Based On Compliance With The First
article Approval Requirements
(c) In The Event Of The First Article Approval Requirement Is Granted, The Delivery Schedule For The Production Items Shall Be Reduced By The Number Of Days Designated For Delivery Of First Article Test Unit Plus The Number Of Calendar Days Indicated For The
government Notification Of Conditional Approval Or Approval. These Requirements Are Specified In The Quality Assurance Section Of This Solicitation. If The Offeror Is Unable To Meet The Desired Schedule, He Shall Insert Below The Alternate Delivery Schedule
he Offers To The Government. Offeror's Proposed Alternate Delivery Schedule (based On Waiver Of First Article Approval Requirements)
within Days:
item No. _____________ Quantity:_______ After Date Of Contract:_________
4.11 . Mandatory Inspection Requirements:
100% Procurement Contracting Officer (pco) Mandatory Inspection Is Required And Shall Be Accomplished At Source Under The Surveillance And Final Approval Of The Cognizant Dcmao Quality Assurance Representative (qar).
during Production, Mandatory Inspection Is Required To Be Accomplished By The Contractor As Follows: A. Level Of Inspection (loi). 1. Critical Characteristics: 100% Inspection Shall Apply. 2. Major And Minor Characteristics: Loi Shall Be In Accordance With A Sampling Plan Acceptable To The Qar. B. Critical Characteristics: ;roy Janney Nawcadlke Qa / Tel: (732)-323-2834
e-mail: Roy.a.janney.civ@us.navy.mil; C. Major And Minor Characteristics 1. Shall Be Defined By The Contractor Subject To Qar Concurrence, Unless Defined On Applicable Drawings And Associated Specifications.
4.12 Special Inspection Requirements
( ;applies; ) Magnetic Particle Inspection
( ;applies; ) Surface Inspection
( ; ; ) Penetrant Inspection
( ;n/a; ) Radiographic Inspection
( ;n/a; ) Ultrsonic Inspection
( ;n/a; ) High Shock Test
( ;n/a; ) Mechanical Vibration Test
4.13 Final Inspection Requirement:due To The Critical Nature Of This Item, Representatives Of The Buying
office/and The Cognizant Field Activity, Nawc Lakehurst, Shall Be Notified By The Successful Contractor At Least 14 Days Prior To Presentation To The Dcm Qar Of The Items For Final Inspection So That They May Have The Option Of
witnessing The Final Inspection. The Contractor Shall Notify By Email Or
telefax Pco And Nawc Lakehurst Qa ;roy Janney Nawcadlke Qa / Tel: (732)-323-2834
e-mail: Roy.a.janney.civ@us.navy.mil; To Arrange For The Final Inspection.the Authority Of The Qar Shall Not Be Abrogated. If The Notification Is Not Given To Both Sites Then The Qar Shall Not Accept The Units.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
this Is A Critical Safety Item.
for Drawing Updates, See Attached Nawc Lke Drawing Update Sheet.
for Navicp Reference Only: Procurement Tdr 24-10082 Was Utilized To Build Tdp
the Components Being Acquired Under This Solicitation Have Been Classified As"critical" Requiring Engineering Source Approval By Naval Air Systems Command. Only Those Companies Who Have Been Approved Will Be Eligible For Award Under This Solicition. Any Company
not Previously Approved May Submit A Source Approval Request As Outlined Later In This Solicitation.
\ date Of First Submission=asreq
16. Remarks:
(block 12): Concurrently With Delivery Of Fat Items.
inspection/certification Data Needed To Substantiate The Quality Of The First Article Test Unit Shall Be Included In First Article Unit Packaging. The Outside Of The Package That Contains The Data Shall Be Clearly Marked "inspection/certification Data Included".
data Requirements:
a. Copies Of All Approved Requests For Variations.
b. Identification Per Drawings 510872, 323195, 323196, B408573, 416328, 416330, 416332, 418772, 420340, 510875, 511224, 514822, 514823.
c. Assembly Per Drawings 510872, 511224.
d. Design Requirements Per Note 1 Of Drawing 416328.
e. Dimensional Inspection Per Drawings 323195, 323196, B408573, 416328, 416330, 416332, 418772, 420340, 510875, 511224, 514822, 514823.
f. Surface Finish (of Bare Metal) Per Drawings 323195, 323196, 418772, 420340, 510875, 511224, 514822, 514823.
g. Heat Treatment Per Drawings 416330, 418772, 510875, 514822.
h. Magnetic Particle Inspection Per Drawings 416330, 418772, 420340, 510875, 511224, 514822, 514823.
i. Material Properties Per Drawings 323195, 323196, B408573, 416330, 416332, 418772, 420340, 510875, 511224, 514822, 514823.
j. Thread Dimensions And Designations Per Drawings B408573, 511224. Documentation Shall Include Verification That The Pitch And Functional Diameters Were 100% Inspected In Accordance With System 22 Of Fed-std-h28/20.
k. Welding Per Note 13 Of Drawing 514823.
l. Magnetic Particle Inspection Of Area "x" And Section "d-d" Of Drawing
514822 Prior To Chromium Plating.
m. Dimensional Inspection In Area "x" And Section "d-d" Of Drawing 514822 Prior To Chromium Plating.
n. Hardness Testing In Area "x" And Section "d-d" Of Drawing 514822 Prior
to Chromium Plating. date Of First Submission=asreq
16. Remarks:
(block 12) Concurrently With Final Inspection.
data Requirements:
a. Copies Of All Approved Requests For Variations.
b. Identification Per Drawings 510872, 323195, 323196, B408573, 416328, 416330, 416332, 418772, 420340, 510875, 511224, 514822, 514823.
c. Assembly Per Drawings 510872, 511224.
d. Design Requirements Per Note 1 Of Drawing 416328.
e. Dimensional Inspection Per Drawings 323195, 323196, B408573, 416328, 416330, 416332, 418772, 420340, 510875, 511224, 514822, 514823.
f. Surface Finish (of Bare Metal) Per Drawings 323195, 323196, 418772, 420340, 510875, 511224, 514822, 514823.
g. Heat Treatment Per Drawings 416330, 418772, 510875, 514822.
h. Magnetic Particle Inspection Per Drawings 416330, 418772, 420340, 510875, 511224, 514822, 514823.
i. Material Properties Per Drawings 323195, 323196, B408573, 416330, 416332, 418772, 420340, 510875, 511224, 514822, 514823.
j. Coating Per Drawings 510875, 514822, 514823.
k. Thread Dimensions And Designations Per Drawings B408573, 511224. Documentation Shall Include Verification That The Pitch And Functional Diameters Were 100% Inspected In Accordance With System 22 Of Fed-std-h28/20.
l. Plating Per Note 8 Of Drawing 514822.
m. Welding Per Note 13 Of Drawing 514823.
n. Nitride Hardening Per Note 4 Of Drawing 420340.
o. Magnetic Particle Inspection Of Area "x" And Section "d-d" Of Drawing 514822 Prior To Chromium Plating.
p. Dimensional Inspection In Area "x" And Section "d-d" Of Drawing 514822 Prior To Chromium Plating.
q. Hardness Testing In Area "x" And Section "d-d" Of Drawing 514822 Prior To Chromium Plating. date Of First Submission=090 Dac
16. Remarks:
(block 5) Data Requirements:
a. Weld Procedure Iaw Navsea S9074-ar-gib-010/278^ Para 4.2 Per Drawing 514823.
(block 13) Date Of Subsequent Submmision: Approval Or Reason For Disapproval Shall Be Given By Navairwarcenacdivlke Via The P.c.o. Nlt 45 Days After Disapproval.
(block 14) Addresses For Navair Codes:
navairwarcenacdivlke
code Bl14000 Bldg 596
hwy 547
joint Base Mdl, Nj 08733-5000
navairwarcenacdivlke
code Bl32300 Bldg 562
hwy 547
joint Base Mdl, Nj 08733-5000
navairwarcenacdivlke
code Bl41600 Bldg 148
hwy 547
joint Base Mdl, Nj 08733-5000
the Welding Procedures Will Be Used By The Government To Verify Contractor Designated Welding Responsibilities Implement Weld Procedures For Each Cont Ractor, Subcontractor Or Welding Entity Performing Welding On Specific Work Specifications date Of First Submission=090 Dac
16. Remarks:
(block 5 ) Data Requirements:
a. The Weld Procedure Qualification Test Report, Including All Supporting Test Reports And Documentation, Iaw Navsea S9074-aq-gib-010/248^ Para 4.2.3 And 4.6 Drawing 514823.
(block 13) Date Of Subsequent Submmision: Approval Or Reason For Disapproval Shall Be Given By Navairwarcenacdivlke Via The P.c.o. Nlt 45 Days After Disapproval.
(block 14) Addresses For Navair Codes:
navairwarcenacdivlke
code Bl14000 Bldg 596
hwy 547
joint Base Mdl, Nj 08733-5000
navairwarcenacdivlke
code Bl32300 Bldg 562
hwy 547
joint Base Mdl, Nj 08733-5000
navairwarcenacdivlke
code Bl41600 Bldg 148
hwy 547
joint Base Mdl, Nj 08733-5000 date Of First Submission=asreq
16. Remarks:
(block 5) Contract Reference:
a. Evidence Of Welder Performance Qualification, Including Supporting Test Results And Documentation, Iaw Navsea S9074-aq-gib-010/248^ Para 5.2 Per Drawing 514823.
(block 12) Date Of First Submission - 30 Days Prior To Production.
(block 13) Provide Qualification Evidence For All Welders.
(block 14) Addresses For Navair Codes:
navairwarcenacdivlke
code Bl32300 Bldg 562
hwy 547
joint Base Mdl, Nj 08733-5000
navairwarcenacdivlke
code Bl41600 Bldg 148
hwy 547
joint Base Mdl, Nj 08733-5000 date Of First Submission=090 Dac
16. Remarks:
(block 5) Contract Referenc:
a. Evidence Of Level Iii Certification Iaw T9074-as-gib-010/271^ Para 1.6 For The Individual Who Approved The Welders Qualification Training Program Iaw Navseas9074-aq-gib-010/248 Para 5.2.3.1, Per Drawing 514823.
(block 14) Addresses For Navair Codes:
navairwarcenacdivlke
code Bl32300 Bldg 562
hwy 547
joint Base Mdl, Nj 08733-5000
navairwarcenacdivlke
code Bl41600 Bldg 148
hwy 547
joint Base Mdl, Nj 08733-5000 date Of First Submission=090 Dac
16. Remarks:
(block 5) Contract Reference:
a. Visual Inspection Written Procedure To Be Used To Visually Inspect All Welds Iaw T9074-as-gib-010/271^ Para 8.3 And 1.7 Thru 1.7.3 Per Drawing 514823.
(block 14) Addresses For Navair Codes:
navairwarcenacdivlke
code Bl32300 Bldg 562
hwy 547
joint Base Mdl, Nj 08733-5000
navairwarcenacdivlke
code Bl41600 Bldg 148
hwy 547
joint Base Mdl, Nj 08733-5000 date Of First Submission=090 Dac
16. Remarks:
(block 3) Subtitle: Welder Qualification Training Written Procedure.
(block 5) Contract Reference:
a. Evidence Of Approval Of The Welder Qualification Training Program Iaw Navseas9074-aq-gib-010/248^ Para 5.2.3.1(d), Per Drawing 514823.
(block 14) Addresses For Navair Codes:
navairwarcenacdivlke
code Bl32300 Bldg 562
hwy 547
joint Base Mdl, Nj 08733-5000
navairwarcenacdivlke
code Bl41600 Bldg 148
hwy 547
joint Base Mdl, Nj 08733-5000 date Of First Submission=090 Dac
16. Remarks:
(block 5) Contract Reference:
b. Evidence Of Maintenance Of Qualification For All Welders Iaw Navsea S9074-aqgib-010/248^ Para 5.2.11 And 5.2.12 Per Drawing 514823.
(block 14) Addresses For Navair Codes:
navairwarcenacdivlke
code Bl32300 Bldg 562
hwy 547
joint Base Mdl, Nj 08733-5000
navairwarcenacdivlke
code Bl41600 Bldg 148
hwy 547
joint Base Mdl, Nj 08733-5000
GOVERNOR CELESTINO GALLARES MULTI SPECIALTY MEDICAL CENTER Tender
Healthcare and Medicine
Philippines
Closing Date3 Jan 2025
Tender AmountPHP 60.3 Million (USD 1 Million)
Details: Description Gov. Celestino Gallares Multi-specialty Medical Center Invitation To Bid For Supply, Delivery, Installation, Testing And Commissioning Of 2 Lots Various Medical Equipment Batch 3 (re-bid) For Gov. Celestino Gallares Multi-specialty Medical Center 1. The Gov. Celestino Gallares Multi-specialty Medical Center (gcgmsmc), Through The Health Facilities Enhancement Program 2024 Intends To Apply The Sum Of Sixty Million Three Hundred Forty-four Thousand Nine Hundred Seventy-five Pesos Only (php60,344,975.00) Being The Abc To Payments Under The Contract For Cb:2024-12-0007. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Gcgmsmc, Through The Health Facilities Enhancement Program 2024 Intends To Apply The Sum Of Sixty Million Three Hundred Forty-four Thousand Nine Hundred Seventy-five Pesos Only (php60,344,975.00) Being The Abc To Payments Under The Contract For Each Lot/item.et Al. Lot No. Item/description Quantity Unit Cost Total Cost 1 Infusion & Monitoring System 1 37,344,975.00 37,344,975.00 2 Advanced Perfusion System, Cardiopulmonary Bypass Pump + In-line Blood Gas Monitoring Device 1 23,000,000.00 23,000,000.00 Grand Total 60,344,975.00 Bids Received In Excess Of The Abc For Each Lot Shall Be Automatically Rejected At Bid Opening. 2. The Gcgmsmc, Now Invites Bids For The Above Procurement Project. Delivery And Installation Of The Goods Is Required Within 120 Calendar Days And Succeeding Installation Must Not Exceed 120 Calendar Days. Bidders Should Have Completed, Within 3 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Gcgmsmc Through Electronic Mail Via Procurement@cpspecialtycenter.org Or Through The Cellular Number 09209437250. 5. A Complete Set Of Bidding Documents May Be Acquired And Downloaded By Interested Bidders From Gcgmsmc Google Drive From (procurement@cpspecialtycenter.org) On December 08, 2024– January 03, 2025 And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Indicated Below In Accordance With The Following Schedule: Lot No. Item/description Total Cost Bidding Documents Fee (in Philippine Peso) 1 Infusion & Monitoring System 37,344,975.00 25,000.00 2 Advanced Perfusion System, Cardiopulmonary Bypass Pump + In-line Blood Gas Monitoring Device 23,000,000.00 25,000.00 The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees Through Online Banking Or Online Deposit With The Following Bank Details: Bank Name: Development Bank Of The Philippines Account Name: Gcg Multi-specialty Medical Complex Account Number: 00-0-15490-780-5 "for Bidders Choosing To Pay Via Online Transfer Or Bank Deposit, Please Ensure That Proof Of Your Successful Transaction Is Promptly Sent To The Procurement Email Address: Procurement@cpspecialtycenter.org. In Compliance With Coa Circular Number 2021-014, Clause 5.2, An Acknowledgement Receipt Will Be Issued As Proof Of Verified And Received Payment. Access To Bidding Documents Will Be Granted Only Upon Presentation Of This Acknowledgement Receipt. 6. The Gcgmsmc Will Hold A Pre-bid Conference On The 17th Day Of December 2024 At 0900h At Room 3c-e310 Located At The 3rd Floor Of Gcgmsmc Building C, Malayo Sur Cortes, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission On Or Before The 3rd Day Of January 2025 At 0900h At Gcgmsmc Procurement Office Room 3c-w327 Located At The 3rd Floor Of Gcgmsmc Building C, Malayo Sur, Cortes, Bohol. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On The 3rd Day Of January 2025 At 0900h At Room 3c-e310 Located At The 3rd Floor Of Gcgmsmc Building C, Malayo Sur Cortes. Bids Will Be Opened In The Presence Of The Bidders’ Authorized Representatives Together With Their Company Id. 10. The Gcgmsmc Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. Submission Of Hardcopies: Bidders Shall Submit Their Original Eligibility And Technical Documents Described In Itb Clause 10 In One Sealed Envelope Marked "original - Technical Component", And The Original Of Their Financial Component In Another Sealed Envelope Marked "original Financial Component", Sealing Them All In An Outer Envelope Marked "original Bid". Each Copy Of The First And Second Envelopes Shall Have 2 Copies And Similarly Sealed Duly Marking The Inner Envelopes As "copy No. 1 Technical Component" And "copy No. 1- Financial Component” And "copy No. 2- Technical Component" And "copy No. 2- Financial Component" And The Outer Envelope As "copy No. 1" And "copy No. 2" Respectively. These Envelopes Containing The Original And The Copies Shall Then Be Enclosed In One Single Envelope. Please Take Note That All Notarized Documents Must Be Treated As Original Copies For All The Submitted Documents (original, Copy 1, And Copy 2). It Is Imperative That Each Copy Retains Its Original Notarization To Ensure Legal Validity And Compliance. The Original And The Number Of Copies Of The Bid As Indicated In The Itb Clause 15 Shall Be Typed Or Written In Ink And Shall Be Signed By The Bidder Or Its Duly Authorized Representative/s. All Envelopes Shall: A. Contain The Name Of The Contract To Be Bid In Capital Letters; B. Bear The Name And Address Of The Bidder In Capital Letters; C. Be Addressed To The Procuring Entity's Bac In Accordance With Itb Clause 1; D. Bear The Specific Identification Of This Bidding Process Indicated In The Itb Clause 1 12. For Further Information, Please Refer To: Mary Grace L. Simbajon Jessa O. Quiñal Procurement Office Procurement Office Malayo Sur, Cortes, Bohol Malayo Sur, Cortes, Bohol Procurement@cpspecialtycenter.org Procurement@cpspecialtycenter.org +639209437250 +639452478632 December 06, 2024 Approved By: (signed) Doreen A. Lugo, Lpt Bac Chairperson Noted By: (signed) Laurence Elliot R. Tirol, Md, Fpcp Medical Center Chief ------------------------------------------------------------------------------------------------------------ Item: 1 Unit: Lot Qty: 1 Unit Cost: 37,344,975.00 Total Cost: 37,344,975.00 Description: Supply, Delivery, Installation, Testing & Commissioning Of Infusion & Monitoring System 150 Pump, Volumetric Infusion 40 Docking Station/s 1 Central Monitoring System 1 Mri-compatible Infusion System 1 Oximetry Monitoring System, Non-invasive Pump, Infusion Volumetric, 150 Units Size Less Than Or Equal To 210 (l) X 140 (w) X 73 (h) Millimeters (mm) Weight Less Than Or Equal To 1700 Grams (g) Screen Must Be At Least Three (3) Inches, Touchscreen, Thin Film Transistor (tft) Color Liquid Crystal Display (lcd), At Least 200 X 400 Pixel/s, Adjustable Brightness Levels Display Must Show The Following Information At Least: Infusion Status With Drug/s Name, Infusion Parameter/s, Real-time In-line Pressure; System Status Information With Infusion Mode, Intravenous Set Brand Or Bed Number, Alarm Symbol/s, Battery Status, Network Status, Relayed Status, And System Time; Must Show Infusion Status Indicator On The Door Accuracy: ≤ ± 4.5% Mode/s: Rate Mode, Dose Mode, Dose Time Mode, Time Mode, Sequential Mode, Intermittent Mode, Loading Dose Mode, Ramp Mode, Micro-infusion Mode And/or Drip Mode Must Support The Following Application/s : Intravenous Drug Infusion, Enteral Nutrition Feeding, And/or Blood Transfusion Flow Rate/s: 0.10-2300 Milliliter/s (ml) Per Hour (hr) And/or 0.10-2000 Ml/hr Increment/s: 0.01 Ml/hr (0.10-99.99 Ml/hr), 0.1 Ml/hr (100-999.9 Ml/hr), 1 Ml/hr (1000-2300 Ml/hr) Preset Time/s: 00:00:01-99:59:59 Preset Volume: 0.10-9999.99 Ml With Increments Of 0.01 Ml Accumulated Volume: 0.00-99999.99 Ml “keep Vein Open”: (kvo): 0.1-5.0 Ml/hr With Increment/s Of 0.01 Ml/hr Purge Rate: 0.1-2300 Ml/hr Bolus Rate: 0.1-2300 Ml/hr, Automatic Or Manual Occlusion Detection: 50-1125 Millimeters Mercury (mmhg) With At Least 15 Selectable Levels Such As 50, 150, 225, 300, 375, 450, 525, 600, 675, 750, 825, 900, 975, 1050, 1125 Mmhg); With Default Of 450 Mmhg; Pre Alarm Pops Up While Pressure Is Increasing; Auto-restart Capability Where On/off And Restart The Infusion When Occlusion Pressure Is Reduced; Pressure Unit/s Available Such As, Millimeters Mercury (mmhg), Kilo Pascal/s (kpa), Bar, And/or Pounds Per Square Inch (psi) Air Bubble Detection, With At Least Six (6) Level/s, 15, 50, 100, 250, 500, 800 Microliter/s; Air Accumulation 0.1-1.0 Ml Per 15 Minutes Dose Rate Unit/s Must Include The Following: Ng/kg/min, Ng/kg/hr, Ng/kg/24h; Ug/kg/min, Ug/kg/h, Ug/kg/24h, Mg/kg/min, Mg/kg/h, Mg/kg/24h; Mu/kg/min, Mu/kg/h, Mu/kg/24h; U/kg/min, U/kg/h,u/kg/24h; Ku/kg/min, Ku/kg/h, Ku/kg/24h; Eu/kg/min, Eu/kg/h, Eu/kg/24h; Mmol/kg/min,mmol/kg/h, Mmol/kg/24h; Mol/kg/min, Mol/kg/h, Mol/kg/24h; Mcal/kg/min, Mcal/kg/h, Mcal/kg/24h; Cal/kg/min, Cal/kg/h, Cal/kg/24h; Kcal/kg/min, Kcal/kg/h, Kcal/kg/24h; Meq/kg/min, Meq/kg/h, Meq/kg/24h; Auto Lock Time: 1-5 Minute/s Range With On/off Switch Drug Library Up To 5000 Drug/s, 30 Categories, Support For Color-coding History Log Up To 3500 Event/s Volume Collection Available In At Least 4 Method/s Including, 24 Hour Total, Current Total, Period, Timing Volume, Support History Rate Review Dose Error Reduction System Available Definition Of Dose Limit/s Automatic Alarm/s When Reaching Dose Limit/s Intravenous (iv) Administration Set Must Be Able To Accept Universal Iv Set/s Alarm/s Audible And Visual Alarm/s; Sound Volume Adjustable At Least Eight (8) Level/s 2 Level/s: High: Air In Line, Accumulated Air, Empty, Drop Error, Upstream Occlusion, Downstream Occlusion, Infusion Set Disengaged, No Infusion Tube, Infusion Set Error, No Drop Sensor, Battery Depleted, Volume To Be Infused (vtbi) Complete, Kvo Finish, Relay Invalid And/or System Error Low: Kvo Running, Battery In Use, Battery Error, Cms/egw Disconnected, Standby Time Expired, Dock Connection Interrupted, System Time Error, Relay Invalid Soon, Time Near End, Reminder And/or Low Battery Reminder: 1-5 Minute/s, On/off Switchable Connectivity Communication Wired And Wireless Usb Support Drug Library Import, Patient Data Import/export, History Record Export, Calibration Date Import/export; Multifunction Connector: Rs232, Nurse Call Connector, Dc Adapter Integration: Connect With Infusion Central Station, Connect With Central Monitoring System Battery Operating Time: More Than Or Equal To Five (5) Hour/s At 25 Ml/hr Charging Time: Less Than Or Equal To Five (5) Hour/s To Full Capacity Power Supply Voltage 100-240 Volt/s, Frequency 50-60 Hertz, (hz), Current 0.5-0.21 Ampere/s (a) Work Environment Level Of Resistance To Water And Dust At Least Ingress Protection Rating 33 (ip33) Classification Type Cf, Class 1, Ip33 Docking Station, 40 Units Size: Atleast270 (l) X 170 (w) X 390 (h) Millimeters (mm) Weight: Less Than Or Equal To 3900 Grams Display Screen At Least Three (3) Inches Organic Light Emitting Diode (oled) At Least 265 X 64 Pixels Resolution Showing The Following Information: Bed Number, Patient Name, Battery Status, Network Status, Total Volume For 24 Hours; Must Be Able To Connect Via Hl7 Protocol And Integrate With Hospital Information System/s And/or Electronic Medical Record/s Via Wired Or Wireless Protocol; Usb Support For Drug Library Importation, Patient Information Loading, Patient Data Export, History Record And/or Barcode Reader Connection Multifunctional Connector Rs232 And/or Nurse Call Connector Integration Capability To Synergise/connect With Patient Monitor, Connect With Infusion Central Station, And/or Connect With Central Monitoring System Night Mode Capability With On/off, Start Time, End Time And Sound Volume Adjustable History Record Up To 2500 Mounting Type For Horizontal And Vertical Pole Clamp: Horizontal Diameter Range 10 To 25 Mm; Vertical Diameter Range 15 To 40 Mm; One Pole Clamp Per Shelf Module Programmable Mode: Support Automatic Multi-channel Relay Maintenance: Support 2 To 24 Pumps Tool Free Assembly, Support Batch Calibration, Drug Library Import, And Software Upgrade/s Classification: Type Cf, Class 1, Ip33 Power Supply Battery: Lithium-ion 2500mah Operating Time Of At Least 2 Hours Charging Time At Most 6 Hours Ac Power: 100 To 240 V, 50 To 60 Hertz, 8 To 3.4 A Alarm/s Audible And Visual Alarm/s 2 Level/s: High: Battery Depleted, System Error : Low: Slave Controller Abnormal, Battery In Use, Low Battery, Battery Error, Local Area Network (lan) Internet Protocol (ip) Address Conflict, Wireless Lan Ip Address Conflict, Cms, Egw Disconnect Central Monitoring System System Component/s: Central Station System Center Which Connects Bedside Device/s Hardware: Display/s At Least 24 Inch Tft Lcd Screen/s Medical Grade, At Least Dicom 14, At Least Ip54 Rating Iec 60601, Touch Screen; Must Include Printer/s, Keyboard/s, Mouse/s And Speaker/s Main System Software Specification/s: Number Of Device Up To 64 Patient Monitor/s And Infusion Pump/s Per Station Alarm: Category: Physiological Alarm, Technical Alarm And System Prompt Remote Control: Alarm Switch, Alarm Limits, Alarm Priority, Alarm Pause And Alarm Reset Alarm Analysis: Support Alarm Statistics Trend Review: At Least 240 Hours; Full Disclosure At Least 240 Hours; Data Interface Connection Interface Integrated Egateway Or Standalone Egateway Mri Compatible Infusion System, 1 Unit Size Less Than Or Equal To 560 (l) X 540 (w) X 1540 (h) Mm Including Trolley, Excluding Iv Pole Weight Less Than Or Equal To 50 Kilograms Without Pump/s Display Screen At Least 3 Inches, Oled, 256 X 64 Pixels, Showing The Following Information: Bed Number, Patient Name, Battery Status, Network Status, Total Volume For The Past 24 Hours Infusion Of The Pump; Compatible Pumps At Least 4 Infusion Or Syringe Pumps Mri Scanner Compatibility For Both 1.5 And/or 3.0 Tesla Model/s Alarm/s Audible And Visual Alarm/s 2 Level/s: High: Battery Depleted, Magnet Indicator Battery Depleted, System Error : Low: Low Battery, Magnet Indicator, Battery Low, Battery Error, Lan Ip Address Conflict, Wlan Ip Address Conflict, Network Disconnected Magnet Indicator: Magnetic Field To Be Used In Magnetic Fields Up To 20 Mt; < 20 Mt Green; 20-40 Mt Yellow; > 40 Mt Red; Connectivity Communication Wired Or Wireless Usb Support Drug Library Import, Patient Data Import/export, History Record Export, System Upgrade Integration: Synergy With Patient Monitor, Connect With Infusion Central Station, Connect With Central Monitoring System Material: Ingress Protection Level Ip33 Safety Standards En 60601-1:2006 / A1:2013; En 60601-1-2:2015; En 60601-1-8:2007/a11:2017; F2025-15; F2182-19; F2213-17; F2503-20; Classification Type Cf Class Power Supply Battery: Lithium-ion At Least 3400mah; Ac Power: 100 To 240 V, 50 To 60 Hertz Dock: Operating Time At Least 10 Hours; Charging Time At Most 6 Hours Magnet Indicator: Operating Time Of At Least 720 Hours; Recharging Time At Most 8 Hours Oximetry Monitoring And Connectivity System, 1 Unit Expandable Patient Monitoring And Connectivity Hub That Integrates An Array Of Technologies, Devices, And Systems To Provide Multimodal Monitoring And Connectivity Solutions In A Single Clinician-centric Platform Regional Oximetry, Non-invasive Pulse Oximetry Display Resolution At Least 1280 X 800 Pixels, At Least 10 Inches Diagonal Size, Multi-touch Touchscreen; Customizable Multiple Screen Views To Feature The Most Applicable Data; Can Display Tissue Oxygen Saturation Of Specific Area; Can Display The Difference Between Current Rso2 And User Defined Baseline; Can Display The Difference Between Rso2 And Spo2; Pulse Rate; Perfusion Index; Pleat Variability Index; High-resolution Plethysmograph Waveform And/or Can Display Spectrogram Representing Activity For Both Sides Of The Brain; Must Have Ports Or Docks That Are Compatible To Plug And Play Modules For The Measurement Of Brain Function Monitoring, Regional Oximetry, And Non-invasive Pulse Oximetry Battery Capacity Is At Least Four Hours Module/s: Cerebral Oximetry At Least One, Pulse Co-oximetry At Least One Can Be Used As Bedside, Handheld And/or Transport Monitor Configurable Parameter And Alarm Settings By Patient Population Audible And Visual Alarms For Quick Identification Of Alarming Parameters With Redundant Speaker System. Particulars Vendor Shall Warrant That The Product Supplied Shall Equal The Published Specifications. Vendor Shall Provide No Less Than Five (5) Years Warranty On The System/equipment For Spare Parts And Service Upon Acceptance By End User/s. Vendor Agrees To Provide Free Of Charge All Parts And Labour Necessary To Repair The System During The Period Covered By The Warranty And Replacement Of Any Item/s And/or Part/s Found To Be Defective In Material Or Workmanship Under Normal Use. Vendor Must Conduct Quarterly Preventive Maintenance Program Or Frequently As Recommended By Principal / Manufacturer. Vendor Agrees To Add Equipment Down-time (in Number Of Days) To Total Warranty Period. Vendor Must Respond With Technical Support Staff, Either Remotely 2 Hours Or In-person Where Applicable, Within At Least Twenty-four (24) Hours Upon Notification Of End-user; And Must Perform Corrective Maintenance Within A Maximum Of Fourteen (14) Days Upon Notification Of End-user; System/equipment Shall Be Delivered With At Least One (1) Copy Of All Service Manuals And At Least One (1) Copy Of All User Manuals. System/equipment Shall Be Delivered Complete With All Cabling, Connectors, Junction Boxes, Mounting Hardware, And All Other Accessories Necessary For Full Operation Of The System/equipment, Where Applicable. Vendor Must Certify That All Products Quoted Must Be In Current Production And Publicly Available As Of The Date Of This Tender. Unproven Future Products Shall Not Be Accepted. All Desired Features Listed Must Be In Current Production, Installed And In Use At The Time Of Quote/bid Any And All Software Necessary To Technically Support The System Shall Be Included Any And All Components Not Manufactured By The Vendor/primary Manufacturer Shall Be Listed As Such With Name/address/contact Information Of The Manufacturer Supplied Devices Must Meet All Currently Applicable Safety Standards, Local And International Where Applicable. Vendor Shall Confirm And Certify In Writing That Parts And Labor Will Be Available For The Quoted System For Not Less Than Five (5) Years After The Warranty Period Vendor Shall Agree To Provide Factory Or Principal Manufacturer Training And/or Certification For At Least One (1) In-house Biomedical Technologist Or Engineer And/or End-user. Vendor May Include Post-warranty Comprehensive Preventive Maintenance Program Proposal For The Next 3-4 Years And Must Also Indicate Cost Estimates For Major Spare Part/s Vendor To Shoulder Any Expenses Related To Delivery, Installation, Commissioning, Permit/s, Training And Other Sundries Necessary For The Complete Installation Of The Equipment Vendor Must Have Available Technical Staff And/or Office/s Within The Region Principal/manufacturer May Preferably Have An Existing / Active Quality Management System Certification E.g. Iso 13485 And/or Iso 9001 Progress Billing And Payment May Be Availed By The Winning Bidder As Follows, Otherwise, Full Payment Is Due At The Completion Of The Project And Requirements: 15% Upon Delivery At Site; 30% Upon Complete Installation, And 55% Upon Completion Of Project And/or Acceptance Of End-user. Principal’s / Manufacturer’s Products Must Have Been Present In The Local Market For The Past Ten (10) Years Completion Period For Delivery Must Not Exceed 120 Calendar Days And Succeeding Installation Must Not Exceed 120 Calendar Days. Any Deviation From This Limit Requires Prior Approval By The Head Of The Procuring Entity (hope) And Only Applies During Extenuating Circumstances. -------------------------------------------------------------------------------------------------------------------- Item: 2 Unit: Lot Qty: 1 Unit Cost: 23,000,000.00 Total Cost: 23,000,000.00 Description: Advanced Perfusion System, Cardiopulmonary Bypass Pump + In-line Blood Gas Monitoring Device Heart & Lung Machine With Integrated Centrifugal Pump Built In Centrifugal Pump With The Following Specifications: Controls And Monitor Must Be Mounted To The Machine Drive Unit Must Allow For Interchangeable Components (must Have Flexible Drive Unit For Better Handling) Remote Control Display Panel Must Include The Centrifugal Status And Alarms Flow Sensor Must Be Non-invasive Type One (1) Integrated Centrifugal Pump Plus Either (a) Three (3) Singular Large Pumps + Two (2) Single Small Roller Pump Or (b) A Total Of Five (5) Roller Pumps With Flat Screen Monitor For Heart & Lung Machine Functionality Display Roller Pump Must Have Tubing Clamp Assembly Must Be A Rotatable Pump Head. With Hand Crank Intended For Manual Use In The Event Of Power Failure For Both Roller And Centrifugal Pump With Complete Safety Mechanism Device. Dual Pressure Module Sensor With Two (2) Cable Pressure Intended For Arterial Cardioplegia Digital Pressure Monitoring And Two (2) Manometer For Manual Monitoring. One (1) Temperature Module With At Least Two (2) Channels Level Sensor And Air Bubbles Sensor Intended For Adult And Pedia Circuits That Will Trigger The Machine To Temporarily Stop Avoiding Air Introduction To Patient With Mechanical Gas Blender For Oxygen And Compressed Air With Hose And Accessory Connectors Inclusion Of Vacuum Regulator Device Halogen Or Led Console Lamp With Flexible Arms Back-up Battery Which Can Provide Power For At Least 1 Hour Must Provide At Least Six (6) Pieces Of Tubing Clamp With Guard Can Be Powered By 230v ±10, 60hz With Four Heavy Duty Rolling Wheels And Non-scratching With Lock System Included In-line Blood Gas Monitoring Device The Machine Must Be Capable Of A Continuous Determination Of The Following Tests While On Cardiopulmonary Bypass (cpb): Blood Gas (ph, Pco2, Po2, Hco3, Be, So2) Electrolytes & Hematology (k+, Hgb, Hct) Patient Temperature Oxygen Deliver (do2) Inclusion Of Battery Pack To Ensure Uninterrupted Operation. Capable Of Displaying Alert/alarm Indicator When Parameters Fall Outside The Normal Values Must Be Lcd Or Led Screen Machine Must Be Portable And Fit With The Provided Pole Clamps/bracket For Monitoring In The Heart Lung Machine Cable Head Sensor For Testing Must Be Capable For Arterial Or Venous Sampling Monitoring Must Include Printer For Documentation Of Displayed Values 60 Hertz Machine Electrical Requirement Heater Cooler Machine, At Least Two (2) Unit/s Must Have At Least Two (2) Independent Circuits Intended Either For: A. Oxygenator Heat Exchangers And B. Patient Blankets One (1) Pair Of Hose With Corresponding Connectors For Each Independent Circuit Per Unit Can Be Powered By 230v ±10, 60hz Particulars Vendor Shall Warrant That The Product Supplied Shall Equal The Published Specifications. Vendor Shall Provide No Less Than Five (5) Years Warranty On The System/equipment For Spare Parts And Service Upon Acceptance By End User/s. Vendor Agrees To Provide Free Of Charge All Parts And Labour Necessary To Repair The System During The Period Covered By The Warranty And Replacement Of Any Item/s And/or Part/s Found To Be Defective In Material Or Workmanship Under Normal Use. Vendor Must Conduct Quarterly Preventive Maintenance Program Or Frequently As Recommended By Principal / Manufacturer. Vendor Agrees To Add Equipment Down-time (in Number Of Days) To Total Warranty Period. Must Provide Back-up Immediately Upon Notification Where Applicable. Vendor Must Respond With Technical Support Staff, Either Remotely (2 Hours) Or In-person Where Applicable, Within At Least Twenty-four (24) Hours Upon Notification Of End-user; And Must Perform Corrective Maintenance Within A Maximum Of Fourteen (14) Days Upon Notification Of End-user; System/equipment Shall Be Delivered With At Least One (1) Copy Of All Service Manuals And At Least One (1) Copy Of All User Manuals. System/equipment Shall Be Delivered Complete With All Cabling, Connectors, Junction Boxes, Mounting Hardware, And All Other Accessories Necessary For Full Operation Of The System/equipment, Where Applicable. Vendor Must Certify That All Products Quoted Must Be In Current Production And Publicly Available As Of The Date Of This Tender. Unproven Future Products And Model/s Nearing And/or At The End-of-cycle Shall Not Be Accepted. All Desired Features Listed Must Be In Current Production, Installed And In Use At The Time Of Quote/bid; Any And All Software Necessary To Technically Support The System Shall Be Included Any And All Components Not Manufactured By The Vendor/primary Manufacturer Shall Be Listed As Such With Name/address/contact Information Of The Manufacturer Supplied Devices Must Meet All Currently Applicable Safety Standards, Local And International Where Applicable. Vendor Shall Confirm And Certify In Writing That Parts And Labor Will Be Available For The Quoted System For Not Less Than Five (5) Years After The Warranty Period Vendor Shall Agree To Provide Factory Or Principal Manufacturer Training And/or Certification For At Least One (1) In-house Biomedical Technologist Or Engineer And Other Technical Staff (end-user/s); Vendor May Include Post-warranty Comprehensive Preventive Maintenance Program Proposal For The Next 3-4 Years And Must Also Indicate Cost Estimates For Major Spare Part/s Vendor To Shoulder Any Expenses Related To Delivery, Installation, Commissioning, Permit/s, Training And Other Sundries Necessary For The Complete Installation Of The Equipment Vendor Must Have Available Technical Staff And/or Office/s Within The Region Principal’s/ Manufacturer Products May Preferably Have An Existing/active Quality Management System Certification E.g. Iso 13485 And/or Iso 9001 Principal’s / Manufacturer’s Products Must Have Been Present In The Local Market For The Past Ten (10) Years, May Provide Certification Where Applicable Progress Billing And Payment May Be Availed By The Winning Bidder As Follows, Otherwise, Full Payment Is Due At The Completion Of The Project And Requirements: 15% Upon Delivery At Site; 30% Upon Complete Installation, And 55% Upon Completion Of Project And/or Acceptance Of End-user. Completion Period For Delivery Must Not Exceed 120 Calendar Days And Succeeding Installation Must Not Exceed 120 Calendar Days. Any Deviation From This Limit Requires Prior Approval By The Head Of The Procuring Entity (hope) And Only Applies During Extenuating Circumstances.
City Of Valenzuela Tender
Others...+1Electrical and Electronics
Philippines
Closing Date13 Jan 2025
Tender AmountPHP 858.9 K (USD 14.7 K)
Details: Description Item No. Quantity Unit Of Issue Item Description/specification 1 2 Pcs "digital Electronics (hb) Kumar, V. 2024" 2 2 Pcs "introduction To Electrochemistry Ritu Tomar 2024" 3 2 Pcs "basic Electrical Engineering Mathew West & Sara Miles 2025" 4 2 Pcs "core Concepts In Engineering: Electronics Engineering 2nd Edition Weinert, E. 2024" 5 2 Pcs "electronics Engineering: Principles And Applications Clark, H. 2021" 6 2 Pcs Statics And Analytical Geometry (2nd Edition) 3g Editorial Board 2022 7 2 Pcs "electrical Installation And Maintenance Basic And Intermediate Laxman Singh 2024" 8 2 Pcs "theory Of Machines (hb) Clark, Z. 2024" 9 2 Pcs "optimization Techniques In Power Distribution System Donchin Parasuraman 2024" 10 2 Pcs "core Concepts In Physics: Electricity (2nd Edition) (with Access Code) Carlos Suarez 2024" 11 2 Pcs "environment, Urbanisation And Development (hb) Jain, A.k. 2021" 12 2 Pcs "question Bank In Electrical Engineering 5th Ed Gupta 2017" 13 2 Pcs "industrial Instrumentation Engineering Richard Brawn 2024" 14 2 Pcs "handbook Of Maintenance Management And Engineering Principles And Practices Tomar R.p. 2021" 15 2 Pcs "advances In Classical Mechanics (hb) Kumar, A. 2023" 16 2 Pcs "intelligent Control And Automation (hb) Pehcevski, J. 2023" 17 2 Pcs "vector Analysis Pal, M. 2021" 18 2 Pcs "control Engineering Handbook Modeling, Analysis And Applications (hb) Set Vol. 1&2 Singer, C. 2024" 19 2 Pcs "handbook Of Linear And Partial Differential Equations Haque, M.n. 2021" 20 2 Pcs "textbook Of Mechanics (hb) Yadav, B.s. 2024" 21 2 Pcs "geotechnical Engineering (hb) Kulkarni, R.s. 2023" 22 2 Pcs "structural Mechanics Kashyap, D. 2023" 23 2 Pcs "fluid Mechanics, Fluid Dynamics And Pipe Flow Turbulence, Simulation And Dynamics Brown, W." 24 2 Pcs "indeterminate Structural Analysis Sahoo, D.r. 2021" 25 2 Pcs "earthquake Engineering For Structural Design Mckenzie, L. 2023" 26 2 Pcs "foundation Course For Civil Drafter (book With Dvd) 3g Editorial 2021" 27 2 Pcs "discrete Mathematics Panwar, R. 2024" 28 2 Pcs "computer Organization Anju Gautam 2023" 29 2 Pcs "robotics And Artificial Intelligence (hb) Peeri, R. 2023" 30 2 Pcs "digital Logic Design Murray, L. 2024" 31 2 Pcs "high Performance Computer Architecture Prasad, V. 2022" 32 2 Pcs "engineering Physics Ayouch, N. 2020" 33 2 Pcs "theory, Practice And Techniques In Graphics And Multimedia 3g E-learning 2018" 34 2 Pcs "theory, Practice And Techniques In Object Oriented Programming 3g E-learning 2018" 35 2 Pcs "database Management System Uzair Bashair 2024" 36 2 Pcs "web Technologies Avadhesh Kumar Gupta 2023" 37 2 Pcs Fundamentals Of Software Engineering Mason, H. 2022 38 2 Pcs "methods Of Research And Statistics J. Vidya Sagar 2021" 39 2 Pcs "foundation Course For Computer Network Architect (book With Dvd) 3g Editorial 2021" 40 3 Pcs "events Management Second Edition Dela Cruz, M. Et. Al. 2024" 41 3 Pcs "professional Salesmanship Serrano 2023" 42 3 Pcs Strategic Business Analysis With Management Palma, N. Et.al. 2023 43 2 Pcs Financial Markets Bairan 2024 44 2 Pcs "personal Finance Cabrera, E.et. Al. 2022" 45 2 Pcs Financial Accounting And Reporting Fundamentals Cabrera, E. Et Al. 2022 46 3 Pcs Credit And Collection Flores 2023 47 3 Pcs "thesis And Dissertation Writing Made Easy Mendoza, E. C. Et. Al. 2023" 48 3 Pcs "risk Management As Applied To Safety, Security, & Sanitation Somoray 2023" 49 4 Pcs Practical Research 1 Maranan, M.h. Et. Al. 2023 50 3 Pcs Training And Development 2nd Edition Flores, M. Et. Al. 2023 51 3 Pcs Organization Development 2nd Edition Flores, M. 2023 52 2 Pcs Advance Management Information System Abante, M.v. 2023 53 2 Pcs Data Analytics & Business Intelligence Abante, Et, Al. 2023 54 2 Pcs "income Taxation 2024 Edition Tabag, E. & Garcia, E. 2024" 55 3 Pcs "labor Relations Management And Negotiations (second Edition) Camilar-serrano, A. & Ducut, R. 2023" 56 3 Pcs Advanced Human Resource Management For Private Abante, Et, Al. 2024 57 3 Pcs "strategic Marketing Management Serrano 2024" 58 2 Pcs "advanced Financial Accounting & Reporting Punzalan, Angelito 2022" 59 2 Pcs "government Accounting (ngas) Punzalan & Cardona 2022" 60 2 Pcs "auditing Practice, Cpa Reviewer Roque, Gerardo 2023" 61 2 Pcs "conceptual Framework And Accounting Standards Cabrera, E. Et Al. 2022" 62 2 Pcs Conceptual Framework And Accounting Standards Valix, C. 2024 63 2 Pcs Intermediate Accounting Volume 3 Valix & Peralta 2023 64 2 Pcs "practical Financial Accounting Volume 1 Valix, C. 2023" 65 2 Pcs "practical Financial Accounting Volume 2 Valix, C. 2023" 66 2 Pcs Theory Financial Accounting Valix, C. 2022 67 2 Pcs Notes In Business Law Soriano, F. 2023 68 3 Pcs "obligations And Contracts (law And Application) Soriano, F. 2022" 69 2 Pcs "cost Accounting And Control De Leon, N. 2022" 70 2 Pcs Managerial Accounting - An Integrated Approach Cabrera, E.et. Al. 2022 71 2 Pcs Cpa Reviewer In Taxation 2024 Edition Tabag, E. 2024 72 2 Pcs Income Taxation 2024 Edition Tabag, E. & Garcia, E. 2024 73 2 Pcs Income Taxation Laws, Principles And Application 2023-2024 Edition Banggawan, R. B. 2023 74 2 Pcs Philippine Income Tax Volume 1 -part 1 & 2 Set Llamado, C. & De Vera, J. 2023 75 2 Pcs Transfer And Business Taxation 2023 Edition Tabag, E. & Garcia, E. 2023 76 2 Pcs Nirc + Train + Create: National Internal Revenue Code Of The Philippines, As Amended Aguirre, U.m. 2022 77 2 Pcs Gender And Society With Peace Education Towards An Inclusive Higher Education Perspective Espinol, Et Al 2023 78 2 Pcs Statistics And Probability Revised Edition (shs) Carpio, J. 2023 79 3 Pcs Strategic Management Essentials (tools, Techniques And Best Practices) Pasahol Et Al 2024 80 3 Pcs Advanced Human Behavior Organization With Ethics Abante, Et, Al. 2024 81 3 Pcs "introduction To Qualitative Research Writing: Handbook-worktext For Practical Research 1 Casinto, C.d. 2023" 82 3 Pcs Understanding Society And Culture: A Sociological And Anthropological Approach Riodique Iii, F.c. Et Al. 2024 83 2 Pcs "current Issues: Child And Youth Safety Online (hb) Maria-dolores 2024" 84 3 Pcs Midnight Monologues: Poems And Short Stories Ong, C. 2016 85 3 Pcs Applied English For Academic And Professional Purposes For Senior Highschool (shs) Tandoc, S. 2016 86 2 Pcs Teaching And Assessment Of Grammar Atkinson, I. 2024 87 2 Pcs "social Linguistics And Literacies Basa, R. 2021" 88 3 Pcs "the Teaching And Assessment Of Literature Studies Bacus, Terogo, Bustos, Dapat 2022" 89 3 Pcs "teaching Beginning Literacy Pado, F. 2020" 90 2 Pcs "an Introduction To Linguistics Ortega, S. 2019" 91 2 Pcs Meaning In Language (hb) Wilson, E. 2021 92 3 Pcs Guidebook For Writers And Editiors Lantican, A. 2021 93 2 Pcs Stories From The Other Side And Other Narratives De Viana, A. 2022 94 3 Pcs "technical Writing Mananay, Sumalinog 2022" 95 2 Pcs Laut Stories The Philippine Writers Series 2022 Gayangos, S. 2022 96 3 Pcs Mathematics In The Modern World Reyes 2023 97 3 Pcs Mathematics Of Investment 4th Ed. Sirug 2023 98 3 Pcs Advance Mathematics Adao & Chavez 2023 99 3 Pcs Pre-calculus Senior High School (shs) Chavez, S. 2023 100 3 Pcs Arts: Beyond Borders (contemporary Arts From The Regions) (shs) Constantion Jr., & Marquez 2023 101 3 Pcs Purposive Communication Atkinson, I. 2024 102 3 Pcs Essentials Of Purposive Communication Caudilla 2023 103 2 Pcs Purposive Communication (revised Edition) Zoleta 2023 104 3 Pcs English For Purposive Communication (a Modular Approach) Gutierrez-ang, J. 2023 105 3 Pcs Understanding The Self Developing Life Skills (revised Edition) Magalona, E. 2023 106 3 Pcs The Art Of Self Discovery: An Understanding The Self Workbook-textbook Villanueva; Egargo 2023 107 3 Pcs Understanding The Self:new Normal Edition Palean Et Al 2024 108 3 Pcs Teaching Science In The Elementary Grades Vol. 2 Physics, Earth & Space Bilbao, Larroder, Liaugo 2024 109 3 Pcs "assessment In Learning 1 A Modular Approach 2nd Ed. Helen Boholano,joje Mar,sanchez 2023" 110 3 Unit "action Research For Beginners In Classroom-based Context (a Guide For Pre-service And In- Service Teachers) By De Leon, E.""" 111 3 Pcs Field Study 1 2nd Edition Observation Of Teaching-learning In Actual School Environment Marcela J. 2023 112 2 Pcs Learning Disabilities And Remediation Alice Mathew 2022 113 2 Pcs Childhood And Growing Up (hb) Bhalerao, T. / Damle, S.v. 2023 114 3 Pcs "inclusive Education In Early Childhood Settings Boholano,menorianavarro,jamon,corte S 2024" 115 3 Pcs Exploring Children's Literature To Enhance Literacy In The Elementary Grade Conjusta, G. 2022 116 3 Pcs Children And Adolescent Literature Bacus, Terogo, Bustos, Dapat 2022 117 3 Pcs Field Study 2 Participation And Teaching Assistantship Brawner, D. Et. Al. 2019 118 3 Pcs The Teaching Profession Fernando, Et Al 2024 119 3 Pcs The Teaching Profession In The 21st Century Sarandi & Babao 2024 120 3 Pcs The Teacher And The School Curriculum Fernando, M. & Oamil, E. 2022 121 3 Pcs Teaching And Assessment Of The Macroskills Alda, R.c.et Al. 2022 122 3 Pcs The Teaching Profession Fernando, Et Al 2024 123 3 Pcs Assessment Learning 1 Boholano, H. 2023 124 3 Pcs Let Rev. Professional Education Corpuz Et. Al. 2023 125 3 Pcs Research Writing Made Easy Basilan 2022 126 3 Pcs "let Rev. Prof Ed Assessment In Learning Corpuz, B. And Cuartel, I. 2023" 127 3 Pcs Linya At Galaw (mga Dula Sa Filipino At Ingles) Torres, Jose Victor Z. 2023 128 2 Pcs Sinesosyedad (panunuri Ng Piling Pelikulang Panlipunan) Elmer B. De Leon 2023 129 3 Pcs Borador Isang Pagkilala Sa Layunin Ng Komunikasyon Sa Kolehiyo Alvin B Yapan 2022 130 3 Pcs Global Culture And Tourism Geography Donesa, L. 2020 131 3 Pcs Principles Of Total Quality Management Pasahol Et Al 2024 132 3 Pcs Strategic Management Austria Et Al 2024 133 3 Pcs Strategic Operations Management, 2e Serrano 2024 134 3 Pcs Information Management Cortez 2023 135 2 Pcs E-governance For Development Administration Abante, Et, Al. 2024 136 3 Pcs Philippine Politics And Governance With 1987 Philippine Constitution Sanchez, R. Et. Al. 2023 137 3 Pcs Advanced Public Fiscal Management, Finance And Accountability Abante, Et, Al. 2024 138 3 Pcs Advanced Local Government And Regional Administration Development Abante, Et, At. 2024 139 3 Pcs "transcendence Understanding Contemporary Global Dynamics Issues And Challenges Dc Coronacion; Fc Calilung 2024" 140 2 Pcs "introduction To Sociology (hb) Ralhan, S.s./ Lambat, S.r. 2023" 141 2 Pcs "political Social And Economic Sociology Chandrama Singh 2024" 142 2 Pcs Essentials Of Environmental Science (hb) Palani, V. 2024 143 2 Pcs Heat, Light And Optics (hb) Singh, A.p. 2023 144 2 Pcs Advances In Plant Cell Physiology (theory And Practice) (hb) Joshi, D. 2023 145 2 Pcs Basics Of Magnetism (pb) 3g Elearning 2024 146 2 Pcs Fundamentals Of Physics 3g Editorial Board 2022 147 2 Pcs The Life, Works, Writings And Travels Of Dr. Jose P. Rizal Ayson 2022 148 3 Pcs The Contemporary World Mananay,sanchez,sumalinog,argate,cadosales 2024 149 3 Pcs A History Of The Philippines Student Edition (reprint) Tan, Samuel K. 2023 150 2 Pcs Readings In Philippine History 2nd Edition Outcome-based Module Asuncion. N. 2022 151 2 Pcs The Life And Works Of Rizal Balili Et Al 2023 152 3 Pcs Unravelling The Absolute Moral Principle:ethics For College Students. Rev. Ed. L.e. Buenaflor, Et Al 2024 153 3 Pcs Guidebook For Writers And Editors Lantican, A. 2021 154 2 Pcs Introduction To Broadcasting James, B. 2024 155 3 Pcs Events Management (revised Edition) Rodolfa, B. 2022 156 2 Pcs Disaster Readiness And Risk Reduction For Senior High School (shs) Serapio, M. 2016 157 3 Pcs The Advertiser's Blueprint Sygaco, S.b. 2024 158 2 Pcs Introduction To Journalism Warner, A. 2024 159 2 Pcs Communication Research Methods Warner, A. 2024 160 3 Pcs Sinesosyedad (panunuri Ng Piling Pelikulang Panlipunan) Elmer B. De Leon 2023 161 3 Pcs Disaster And Risk Reduction Management With Covid19 Modules Mogol 2022 162 2 Pcs Understanding Media, Culture And Technology Stewart, F. 2021 163 2 Pcs "public Administration In The Developing World: Operating In A Poorly Funded Context (hb) Buama, C. A. 2021" 164 3 Pcs "promoting Community Change Through Civic Welfare Training Service 2 Briones, M. Et.al. 2024" 165 5 Pcs (path ? Fit 2) Physical Activity Towards Health And Fitness Combative Sports And Outdoor Recreational Activities Bulatao Et. Al. 2023 166 5 Pcs "physical Activity Towards Health & Fitness 1 (path-fit 1) Health & Wellness, Movement Education And Exercise Program Punzalan, M.d, Et. Al. 2023" 167 5 Pcs Physical Activity Towards Health And Fitness (path-fit 4 Sports) Individual/dual And Team Sports Medina-bulatao, M. G. Et. Al. 2023 168 5 Pcs Physical Education 4 Path Fit 2 Sports College Textbook Punzalan, M.d. Et. Al. 2019 169 5 Pcs Physical Activity Towards Health & Fitness 3 (path-fit 3) Menu Of Dance Punzalan, M. D. Et. Al. 2023 170 5 Pcs Physical Education And Health: Aquatic (basic Swimming) And Mountaineering Revised Edition Latorre 2023 171 5 Pcs Physical Activities Towards Health And Fitness Pathfit 2: Exercise-based Fitness Activities Ballecer, M. 2023
Bureau Of The Treasury Tender
Manpower Supply
Philippines
Closing Date3 Jan 2025
Tender AmountPHP 916.9 K (USD 15.8 K)
Details: Description Description : Supply Of Security Services Brief Description : Provision Of Personnel To Perform Security Services To Btr Regional Office Located At Pres. Corazon C. Aquino Regional Government Center, Balintawak, Pagadian City, Zamboanga Del Sur And To The Provincial Offices Of Zamboanga City, Zamboanga Del Norte And Basilan No. Of Days Work : 365 Days Duration Of The Contract : January 01, 2025 To September 30, 2025 Approved Budget For The Contract : Regional Office 2 P 40, 870.00 X 9 Months = P 367, 830.00 Po - Zamboanga City/ Sibugay 1 20,336.00 X 9 Months = 183, 024.00 Po - Zamboanga Del Norte 1 20,336.00 X 9 Months = 183, 024.00 Po - Basilan 1 20,336.00 X 9 Months = 183, 024.00 Total P 101,878.00 P 916,902.00 I. Scope Of Work And Services A. The Security Guard/s Shall Perform The Following: Regional Office - Each Of The Two (2) Security Guards Shall Perform Work Of Eight (8) Hours Per Day, Seven (7) Days A Week Inclusive Of Regular And Special Holidays. Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices - Three (3) Security Guards For The Respective Provincial Offices To Perform Work Of (8) Hours Per Day, Seven (7) Days A Week Inclusive Of Regular And Special Holidays. 1. Safeguard The Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices, Their Attached Structures And Facilities From Fire, Criminal Infiltration, Economic Sabotage, Electronic Attack, Bomb Threats, Flood Damage, Vandalism, And Other Forms Of Physical Destruction. Term Of Reference: Security Agency For Cy 2025 Page 2 Of 9 2. Safeguard The Vehicles, Furniture And Other Materials Against Theft, Robbery, Fire, Arson And Other Form Of Crimes. 3. Safeguard The Btr Personnel, Clients And Visitors Against Harm Or Threats While Within The Offices’ Premises During Official Hours, Including Off-hours Whenever Their Access Are Authorized. 4. Promote And Maintain Peace And Order Within The Premises Of Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices, The Assigned Areas Of Responsibility Including, But Not Limited To, The Designated Restricted And High-risk Areas Within The Premises. 5. Expedite Any And All Activities In Support Of The Mission And Objectives Of The Btr Including All Legal And Lawful Instructions Handed Down By The Higher Authority. 6. Record And Document In The Security Guard’s Logbook Or Journal All Significant Events Occurring In His Area Of Responsibility And/or Report In Writing Any Incident Inimical To The Safety And Integrity Of The Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices. 7. Maintain Proper Decorum, Personal Discipline, Grooming, And Decent Uniform While On Duty And Refrain From Reading Newspapers, Using Cellular Phones And Gadgets, Drinking Alcoholic Beverages, Taking Prohibited Drugs, Or Any Other Activities That Will Cause Distraction In The Proper Performance Of His Duty. 8. Comply With Orders, Circulars, And Other Policies Of The Btr, Including Lawful Orders Of The Regional Director, The Heads Of Provincial Offices, Or Their Authorized Representatives. 9. To Strictly Comply With Republic Act No.5487, As Amended By P.d. 1919, Otherwise Known As The Private Security Law, And Its Implementing Rules And Regulations Issued By The Director General Of The Philippine National Police. Ii. Strategic Areas To Be Covered By Security Services A. Perimeter Area(s); B. All Floors From Ground Floor To Rooftop, Including The Garage And Utility Areas Of The Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices; C. All Property Of The Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices, Beginning From Ground Floor To Rooftop. Term Of Reference: Security Agency For Cy 2025 Page 3 Of 9 Iii. Schedule Of Requirements The Following Shall Be Provided By The Contractor: Item No. Qty. Description Bidder’s/supplier’s Compliance 1. *5 Sgs Security Guards Must Be: I. Filipino Male Citizen Ii. Preferably Those Who Have Completed 72 Units In College. Iii. Preferably With Experience In Guarding Government Facility Iv. Able To Communicate In Oral And Written English. V. Physical And Mentally Fit To Perform Security Duty. Vi. 25-45 Years Of Age. Vii. Minimum Height: 5 Ft. And 5 Inches Viii. Undergone Pre-licensing Training Administered Or Authorized By Pnpsosia. (provide Proof Of Training) Ix. Able To Prepare Investigation/spot Reports. X. Passed Np Evaluation And Drug Testing With Proof Of Compliance. Xi. Must Have Undergone Special Trainings On Anti-terrorism; Basic Fire Safety/prevention And Suppression; Basic First Aid And Self-defense Xii. Must Possess A Valid Security License As Of Bidding Date And During Tour Of Duty (submit Copy Of License). Xiii. Must Exhibit Good Moral Character, Honesty, Alertness. Xiv. Must Not Have Been Charged Nor Convicted Of Any Offense Involving Moral Turpitude (submit Appropriate Clearance, Barangay, Police And Nbi). 2 Materials/equipment/supplies To Be Provided By The Contractor, Per Sg: I. Prescribed Basic Uniforms Ii. Nightstick/baton Iii. Whistle Iv. Timepiece V. Writing Pen Term Of Reference: Security Agency For Cy 2025 Page 4 Of 9 Vi. Notebook And Duty Checklist (electronic Or Not) Vii. Flashlight Viii. First Aid Kit Ix. Service Firearms With Full Capacity Ammo. Load Plus Spare (subj. To Compliance With Pnp Guidelines On The Carrying Of Firearms And Ammunitions). X. Metal Detector Xi. Communication Radio (optional) Xii. Raincoat/pontio The Contractor Shall Provide The Abovementioned Security Personnel With Equipment That Should Be 100% Operational At All Times For The Duration Of The Contract. As To The Issued Firearms, They Must Be Of Genuine Brand Acquired From A Legitimate Source(s). No Paltiks Guns. Iv. Technical Specifications Technical Parameters Based On Gppb Circular No. 24-2007 Item No. Description Bidder’s/supplier’s Compliance 1. Stability Of The Company (a) Years Of Experience I. Has Been In The Business For At Least (3) Years; Ii. Has Experience In Providing Security Service (s) To Government Offices And Financial Institution; And, Iii. Bidders Shall Submit Certification Under Oath Of List Of Contracts Completed For The Past Three (3) Years. (b) Liquidity Of The Contractor Submit Audited Financial Statement For Cy 2020-2021 Duly Stamped By Bir Or Its Accredited And Authorized Institution. (c) Organizational Set-up Organizational Capability Of Any Agency Shall Be Based On Its Compliance With Organizational Structure Of Private Security Agencies Prescribed Under R.a. 5487 And Recent Irrs Implementing The Same. - Submission Of Organizational Chart Showing Key Management Personnel Are Themselves Term Of Reference: Security Agency For Cy 2025 Page 5 Of 9 Qualified And Licensed To Operate And Manage Security Business. - At Least (10%) Of Its Security Guard Force Are Currently Deployed On Important Posting Areas (e.g. Vital Installation, Airports, Power Plants, Banks And Similar Financial Institution And Government Offices). 2 Number Of Licensed Firearms - Agency Shall Have A Minimum Number Of Licensed And Serviceable Firearms (cal.38 Or 9mm For Handguns And/or 12 Gauge For Shotguns) Equivalent To 1/3 Of Their Total Number Of Security Guards; And, - Submit List Of Licensed Firearms 3 Other Factors (a) Recruitment And Selection Criteria - Show The Hiring Process For Security Guards And The Different Training Interventions Given To Security Personnel (b) Completeness Of Uniforms And Other Paraphernalia The Following Shall Comprise The Basic Equipment Of A Security Guard While On Duty: I. Prescribed Basic Uniform With Authorized Black Shoes Ii. Nightstick Or Baton Iii. Whistle Iv. Timepiece (synchronized To City Hall Time) V. Writing Pen Vi. Notebook And Duty Checklist (logbook Paginated And Smythe Sewn) Vii. List Of Emergency Numbers Viii. Flashlight Ix. First Aid Kit X. Service Firearms With Holster Xi. Handcuffs Xii. Communication Radio (optional) Xiii. Stun Devices (optional) Xiv. Raincoat/pontio Term Of Reference: Security Agency For Cy 2025 Page 6 Of 9 V. Other Responsibilities Of The Supplier/contractor A. The Supplier/contractor Shall Ensure That Their Assigned Security Guards To Btr Offices Are Physically And Mentally Fit For Duty During The Duration Of The Contract. Btr Reserves The Right To Require The Assigned Guards To Undergo Physical Fitness Test Before And During The Start Of The Contract. B. The Discipline And Administration Of The Security Guards Shall Conform To The Rules And Regulations Of The Contractor And The Btr. The Rules To Be Set By The Supplier/contractor Should Be Approved By Btr. C. The Supplier’s/contractor’s Personnel Rendering Unsatisfactory Performance, Questionable Actuations Or Behavior Including Repeated Violation Of Btr’s Internal Rules And Policies Shall Be Immediately Replaced Upon Receipt Of Written Memorandum From The Btr. On The Other Hand, The Supplier/contractor Shall Not Replace Security Guards To The Btr Without The Prior Approval From Its Management. D. The Supplier/contractor Shall Provide Its Security Personnel Stationed At The Client’s Offices With At Least (1) Unit License 9mm Handgun With Basic Ammunition Load Plus Extra Loaded Magazine; A Stand-by (1) Unit License 12 Gauge Shotgun To Be Issued Only During Extra-ordinary Situations, I.e., Like Existence Of Rebellion, Widespread Violence, Terroristic Attacks And Situations Calling For A More Heightened Alert. E. The Security Guards Of The Supplier/contractor Shall Never Be Employees Of The Btr. Hence, The Latter Shall Not Be Held Responsible For Any Claims For Compensation In The Event Of Injuries And Death Sustained By The Security Guards Or By Any Third Persons In The Performance By The Latter Of Its Duty With Btr. F. The Supplier’s/contractor’s Security Guards Shall Not Be Allowed To Stay In The Building Premises When On “off-duty”, Except During Times Of Emergency Situations. G. The Supplier/contractor Shall Require Its Security Guards Assigned To Their Respective Stations To Render Services In Accordance With The Contract And This Terms Of Reference. Security Guards Are Expected To Be On The Regional Office’ And Provincial Offices’ Premises At Least (30) Minutes Before The Start Of Duty. H. The Supplier/contractor Shall Prepare At Least Two (2) Relievers To Immediately Assume The Duty From Regular Guards In Case Of Their Absence. I. The Supplier/contractor Shall Require Its Security Guards To Render Services Exceeding The Scheduled Working Hours In The Exigencies Of The Service And/or As The Need May Arise. Absent Security Guards Shall Immediately Be Replaced By Relievers. Term Of Reference: Security Agency For Cy 2025 Page 7 Of 9 J. The Supplier/contractor Shall Assume Full Responsibility For Any Liabilities, Cause/s Of Action Or Claims Which May Be Filed By Any Of The Security Guards Under Labor Laws, Employees Compensation Laws Or Other Special Laws, Rules And Regulations Currently Mandated/implemented By The Department Of Labor And Employment. By Virtue Thereof, The Supplier/contractor Shall Render Btr, Its Officers And Employees, Free And Harmless From Any Such Liabilities, Cause Of Action Or Claims. K. The Supplier/contractor Shall Be Responsible For The Loss, Damage Or Injury That May Be Suffered By Btr Or Its Clients, Personnel And Properties, During The Tour Of Duty Of The Assigned Security Guards. Btr Shall Inform The Supplier/contractor In Writing Within Twenty Four (24) Hours From Its Occurrence Or Discovery. It Is Understood That The Contractor Shall Not Be Liable For Loss/es Or Damage/s Incurred By Btr Due To Fortuitous Events Or Force Majeure, Unless Accompanied By Negligent Acts By The Security Guards Or Their Failure To Take Positive Measures To Prevent Such Loss/es Or Damage/s In Line With Established Contractor And Btr Rules And Policies. Further, The Supplier/contractor Guarantees The Full Compensation For Whatever Loss/es Or Damage/s Which Btr May Sustain On The Occasion Of The Fault And Negligence Of Its Security Guards After Due Investigation Is Conducted On The Matter. L. The Supplier Or Contractor Is Obligated To Submit Proof Of Remittance In Compliance With Various Statutory Social Legislation Measures, Including But Not Limited To Contributions To Sss, Pag-ibig, Philhealth, And Ecc, Retirement Benefits For The Retirement Plan Established Or Remittance To Any Institution Responsible For The Administration And Maintenance Of Such Fund. The Supplier/contractor Shall Also Submit The Monthly Proof Of Payment Of The Basic Pay And Other Benefits Paid Directly To The Guards. This Documentation Must Be Provided To The Bureau Of The Treasury (btr) Within Fifteen (15) Days Following The Conclusion Of Each Month. Failure To Submit The Required Proof Of Remittance Shall Be A Ground For The Suspension Of Contract Payments Until Compliance Is Achieved. Additionally, Any Infringement Of These Standards Or Labor Laws May Result And Constitute As A Ground For The Blacklisting Of The Supplier Or Contractor. M. The Supplier/contractor Shall Comply With Existing Labor Standard Laws And Regulations, Especially In The Payment Of Minimum Wage And Other Statutory Benefits Implemented By Dole, Padpao, And The Pnp. N. In Addition, The Supplier/contractor Shall Submit To Btr The Following Upon Submission Of Their Rfq/proposal: 1. Certification Of Good Standing From The Pnp-sosia (formerly Pnp-sagds) And The Philippine Association Of Detective And Protective Agency Operators (padpao). 2. A Certified Copy Of The License To Operate As A Security Agency From The Pnp Term Of Reference: Security Agency For Cy 2025 Page 8 Of 9 3. Business Permit, Philgeps Certificate, Certificate Of Registration (bir), Tax Clearance, Itr (income Tax Return) O. The Supplier Shall Submit The Cost Distribution Schedule Of Security Services Following The Herein Format. Any Other Benefits May Be Added As Long As The Required Items Specifically Listed Below Are Adhered And Compliant With The Approved Budget Contract. Agency Estimate For Security Guards Factor Days 1st Shift 2nd Shift 393.4 414 414 Estimated Equivalent Monthry Rate = Eemr Payable Directly To Security Guards 1.1 Basic Salary Rate ( Monthly ) Sub- Total 1.2 Night Shift Differential ( Note :only 1 Hour Is Alloted For Night Shift Since Duty Is Only Until 11:00 Pm 1.3 13th Month Pay- 1/12 Of Basic Pay 1.4 Service Incentive Leave Pay - 5 Days Per Year (sil) 1.5 Uniform Allowance 1.6 Retirement Benefit Per Month (eemr * 22.5/12) Sub-total (a) Government Payment 1.7 Sss Premium Er Share (based On Table) 1.8 Sss Ec Er Share (based On Table) 1.9 Philhealth Er Share (5% Total, Shared 50:50 By Ee And Er) 1.10 Sif- Er Share 1.11 Pag_ibig Er Share Sub-total (b) Total Payment To Guards + Gov't ( C) 0.00 0.00 Admin Fee (d)= C * ___% 0.00 0.00 Vat- 12% Of Admin Fee (e )= D *12% 0.00 0.00 Total Vat And Admin Fee 0.00 0.00 Total Contract Cost- Monthly (f )= C + D + E 0.00 0.00 Annual Cost (f * 12 Months) 0.00 0.00 Total Annual Cost To Guards [1st Shift: (h * 4 Guards)] Ro + Zambo. City + Zambo. Del Norte + Basilan 0.00 Total Annual Cost To Guards 2nd Shift Of Regional Office Guard With Night Salary Differential 0.00 Term Of Reference: Security Agency For Cy 2025 Page 9 Of 9 Total First And Second Shift 0.00 Vi. Reservation Clause The Btr Reserves The Right To: Reject Documents That Do Not Comply With The Requirements; To Waive Any Formalities And Documents Or Consider Any Submission Of Documents As Substantial Compliance; To Reject Any And All Bids; To Declare A Failure Of Bidding; To Annul The Bidding Process; Or Not To Award The Contract, Without Thereby Incurring Any Liability To The Affected Potential Supplier Or Bidder/s. This Also Includes The Changes In The Funds/allotment Releases For The Said Program/project/activity Affecting The Award Of Contract, Which Are Either Withheld Or Reduced, At No Fault Of The Btr. The Btr Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidder/s Or Potential Supplier/s For Any Expenses Incurred In The Preparation Of The Bid/proposal. Prepared By: Cesar M. Canoog Jr. Administrative Assistant Ii Approved: Albert Jonathan B. Paulino Director Ii Conformed: _________________________________ Signature Over Printed Nam
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Healthcare and Medicine
United States
Closing Date7 Jan 2025
Tender AmountRefer Documents
Details: Notice Of Sources Sought The Purpose Of This Sources Sought Announcement Is For Market Research To Make Appropriate Acquisition Decisions And To Gain Knowledge Of Potential Qualified Service-disabled Veteran Owned Small Businesses (sdvosb), Veteran Owned Small Businesses (vosb), And Small Businesses Interested And Capable Of Providing The Services Requested, As Well As Any Large Businesses. The Results From This Source Sought Notice Will Be Used To Determine The Appropriate Set-aside. The Intended Contract Is A Firm-fixed Price Service Contract. The Department Of Veterans Affairs, Nco20 Is Looking For Vendor Sources For The Following Requirement: A Blanket Purchase Order (base + 4 Option Years) For Urinalysis Testing See Attachments For More Information: Attachment A: V20 Estimated Urinalysis Test List Volume Attachment B: V20 Participating Medical Centers And Pocs Attachment C: V20 Bpa Price List (must Be Filled Out) Required Information In Your Response To Sources Sought: In Order To Be Considered A Valid Source That Can Impact The Set-aside Determination Of A Possible Future Solicitation, Potential Contractors Shall Provide, At A Minimum, The Following Information To Peter.park2@va.gov By Below Response Deadline: 1) Company Name, Address, And Point Of Contact, Phone Number, E-mail Address, And Uei. Provide Any Existing Gsa/fss Contract Number This Requirement Can Be Fulfilled Under. 2) Please Identify Your Company S Size In Comparison To The Anticipated North American Industry Classification System (naics) Code 334516 Analytical Laboratory Instrument Manufacturing. To Be Considered A Small Business Your Company Must Have Less Than 1,000 Employees. This Notice Is To Determine The Marketplace For This Specific Requirement. Please Check One Of The Following: [ ] Yes [ ] No Service Disabled Veteran Owned Small Business (sdvosb) [ ] Yes [ ] No Veteran Owned Small Business (vosb) [ ] Yes [ ] No Small Business Manufacturers [ ] Yes [ ] No All Other Small Business (sb) [ ] Yes [ ] No Other Than Small Business 3) Any Service-disabled Veteran Owned Businesses Or Veteran Owned Businesses Who Respond To A Solicitation On This Project Must Provide A Sba Certification And Be Registered With U.s. Small Business Administration Veteran Small Business Certification (vetcert) Located At Https://veterans.certify.sba.gov/. 4) Only Authorized Service Representatives/providers Of The Manufacturer Will Be Considered. No Used, Refurbished, Remanufactured, Or Counterfeit Parts Will Be Allowed. Please Provide A Proof Of Authorized Service Provider Letter From Manufacturer. 5) Please Complete The Attached Price List (attachment C). This Is Not A Quote. 6) Capabilities Statement Addressing The Requirements In The Statement Of Work To Include: References For Similar Services Currently Being Provided Or Previously Provided At The Required Service Levels As Outlined In The Statement Of Work. The Government Is Not Obligated To Nor Will It Pay For Or Reimburse Any Costs Associated With Responding To This Sources Sought Notice. This Notice Shall Not Be Construed As A Commitment By The Government To Issue A Solicitation Or Ultimately Award A Contract, Nor Does It Restrict The Government To A Particular Acquisition Approach. The Government Will In No Way Be Bound To This Information If Any Solicitation Is Issued. Notice To Potential Offerors: All Offerors Who Provide Goods Or Services To The United States Federal Government Must Be Registered In The System Award Management (sam Located On The Web At Www.sam.gov). It Is Desirable That Any Offeror To Have Completed Their Business Online Representations And Certifications Application In The System For Award Management (sam). Service Address: Various Stations In Nco 20 See Attachment Point Of Contact: Peter Park Contracting Officer Peter.park2@va.gov Response Deadline: 12/20/2024 By 3:00pm Pacific Time Statement Of Work: Bpa For Visn 20 Cprr Urinalysis Testing Bpa Language The Government Will Award A Cprr Bpa To A Single Contractor For Urinalysis Testing. Contractor Agrees To The Following Terms Of The Bpa Exclusively With Visn 20 And Awarded In The Final Bpa. Under This Agreement, The Bpa Holder Shall Provide Cprr Urinalysis Testing For All Visn20 Medical Facilities. The Vha Facilities Within Visn20 Listed On This Bpa Are Authorized To Order Any Item Listed On The Price/cost Schedule At The Listed Price. No Items May Be Ordered Off This Bpa Unless They Are Listed On The Price/cost Schedule. Additional, Related Items May Be Added Without Further Competition To The Price/cost Schedule With The Award Of A Modification By The Administering Contracting Officer (co). The Administering Co Is The Only Vha Employee Authorized To Modify This Bpa. Obligation Of Funds This Bpa Does Not Obligate Any Funds. The Government Is Only Obligated To The Extent Of Authorized Task Orders Issued Under This Bpa. Period Of Agreement This Bpa Is Effective From The Date Of Award For A Period Of 5 Years. Option To Extend The Term Of The Bpa The Government May Extend The Term Of This Bpa For A Period Of Up To Six (6) Months, Exercisable In Increments Of Not Less Than One (1) Month. By Written Notice To The Contractor At Any Time Prior To The Expiration Of The Bpa, Provided That The Government Shall Give The Contractor A Preliminary Written Notice Of Its Intent To Extend At Least 30 Days Before The Bpa Expires. The Preliminary Notice Does Not Commit The Government To An Extension. Prices And Terms Visn20 Has Provided An Estimated Annual Volume By Test As Reflected In Attachment A. Pricing Is Based On The Average Annual Test Volume. The Government Estimates The Volumes As Listed In Attachment A But Does Not Guarantee Volumes As Listed; They Are Estimates Only And The Government Doesn T Guarantee That All Listed Stations Will Participate In The Bpa. The Government Estimates, But Does Not Guarantee, That Individual Bpa Orders Placed Against This Agreement May Reach $825,000.00/per Order. This Order Limit May Be Increased By Mutual Agreement Of The Parties As Necessary, In Whole Or Part. The Authorized Ceiling Limit Of The Agreement Is Set At $4,500,000.00 Over The Period Covered By The Agreement; This Ceiling Is Also Not A Guarantee. The Ceiling Limit May Also Be Raised In Association With Order Limit Increases Or Other Conditions Which, By Mutual Agreement Of The Parties, Maybe Considered Necessary. Authorization For Individual Task Orders Above The Stated Task Order And/or Ceiling Limits Must Be Coordinated Through The Contracting Officer Before Larger Valued Orders Can Be Issued And Prior To Commencement Of Work. All Unauthorized Work, Regardless Of Amount, Will Be Processed Through The Ratification Process. Price/cost Schedule Estimated Quantities And Pricing Per Facility Order Placement All Properly Warranted Cos Serving Visn20 Are Authorized To Place Orders Under This Bpa. Task Orders Will Be Placed Against This Bpa Using Outlook Email Messages, Electronic Data Interchange (edi), Fax Internet Portal, Paper Or Oral Communications. Delivery Order Oversight Each Ordering Location Will Designate A Contracting Officer's Representative (cor) Or Poc (if Dollar Amounts Warrant A Cor, And Subject To Co Approval), Who Will Be Responsible For Verifying Contract Compliance And Certify Invoices. Requirement Specifications / Statement Of Work Scope: The Contractor Shall Provide Automated Clinical Laboratory Urinalysis Testing For Urine Dipstick Chemistries, Urine Microscopic Analysis, And Body Fluid Analysis (as Applicable) To Produce Cost Per Reportable Results (cprr) For The Locations Listed Below. Installation And Operational Training Will Be Provided By The Vendor At The Government S Facility. Vendor Will Provide Field Service Support. Vendor Will Also Supply Government With Sufficient Supplies, Reagents, And Training To Execute The Urinalysis Analyzer In The Performance Of The Testing Listed For Each Site Based On Estimated Patient Results Per Month. Equipment Will Be Defined By The Facility. Participating Locations: Alaska Va Healthcare System: 1201 North Muldoon Road, Anchorage, Ak 99504 Boise Va Medical Center: 500 West Fort Street. Boise, Id 83702 Eugene Health Care Center: 3355 Chad Dr., Eugene, Or 97408 Va Portland Health Care System: 3710 Sw U.s. Veterans Hospital Road, Portland, Or 97239 Roseburg Va Health Care System: 913 Nw Garden Valley Blvd., Roseburg, Or 97471 Va Southern Oregon Rehabilitation Center: 8495 Crater Lake Hwy., White City, Or 97503 Va Puget Sound Health Care System - American Lake Division: 9600 Veterans Dr Southwest, Tacoma, Wa 98493 Va Puget Sound Health Care System: 1660 S. Columbian Way, Seattle, Wa 98108 Mann-grandstaff Va Medical Center: 4815 N. Assembly Street, Spokane, Wa 99205 Jonathan M. Wainwright Memorial Va Medical Center: 77 Wainwright Drive, Walla Walla, Wa 99362 Map And Locations For Medical Centers And Clinics Within The Visn 20 Northwest Network Can Be Found At The Following Link: Https://www.va.gov/directory/guide/region.asp?id=1020. General Requirements: Leased (cost Per Reportable Result) Equipment. All Related Consumables And Supplies. All Necessary Service To Keep Equipment In Manufacturer's Operating Conditions, Both Preventive Maintenance And Emergency Repairs. Training For Personnel Operating Equipment. Cost Per Reportable Result Cprr: Cost Per Patient Reportable Result (cprr): As Defined In The Federal Supply Schedule Fsc Group 66, Part Iii, Cost-per-test Clinical Laboratory Analyzers - Contractors Are Required To Provide A Price For A Reportable Patient Result. The Per Patient Reportable Result Price Shall Include Costs Covering: (1) 5-year Equipment Use, (2) All Reagents, Standards, Vendor Provided Quality Controls, Supplies, Consumable/disposable Items, Parts, Accessories, And Any Other Item Required For The Proper Operation Of The Contractor S Equipment And Necessary For The Generation Of A Patient Reportable Result. This Per Patient Reportable Result Price Shall Also Encompass All Costs Associated With Dilution; Repeat And Confirmatory Testing Required To Produce A Single Patient Reportable Result. It Shall Also Include The Material To Perform As Well As All Other Costs Associated With Quality Control, Calibration And Correlation Study Testing That Is Prescribed By The Clinical And Laboratory Standards Institute (clsi). (3) All Necessary Maintenance To Keep The Equipment In Good Operating Condition (this Element Includes Both Preventive Maintenance And Emergency Repairs) And (4) Training For Government Personnel. Contractors Shall Provide Delivery, Installation And Removal Of Equipment At No Additional Charge. Parameters: The Calculation For Price And Quantity Of Reagents In The Annual List Included In The Contract As Based On An Estimated Annual Number Of Reportable Results Provided By The Government. The Annual Quantities Of Supplies Shall Be Sufficient For Testing As Long As The Reportable Results Are Submitted In Compliance With The Following Parameters: Numbers Of Reportable Results Actually Performed By The Government Are Within Ten Percent Of The Annual Estimated Reportable Results As Indicated By The Annual Supply List. Use Of The Instrument(s) Are In Accordance With Instrument Usage Information Provided By Government (primary, Back-up Or Alternate). Test Volumes Are Determined By The Government. No More Than 10 Percent Repeats. Two Levels Of Quality Control To Be Run As Required By The Manufacturer Every Test Day. Calibrators For Periodic Calibration Checks And Demand To Validate Systems Following Major Repair Or Resolution Of Negative Quality Control Trends. Adjustments: The Government And Vendor Will Conduct Ongoing Reviews No Less Than Annually To Monitor Contract Performance Against Agreed Upon Efficiencies, Operational Assumptions, And Product Utilization (cppr Parameters). The Vendor Will Notify The Government When Such Reviews Indicate An Adjustment To The Quarterly Standing Order Shipments May Be Required. The Government Will Cooperate With The Vendor In The Conduct Of The Reviews. Vendor, Their Personnel, And Their Sub Vendors Shall Be Subject To The Federal Laws, Regulations, Standards, And Va Directives And Handbooks Regarding Information And Information System Security As Delineated In This Contract.839.201 Contract Clause For Information And Technology Security. Equipment: Vendor Will Provide Urinalysis Analyzer(s) For Lease To Meet Visn20 Facilities Usage Needs. Installation: The Vendor Shall Deliver And Install All Rented Or Purchased Equipment Under This Contract After An Order Is Placed. Equipment Shall Be Installed Within 30 Business Days After Receipt Of Order. Equipment Shall Not Be Considered Installed Until Va Employee Certifies That The Equipment Is Properly Functioning And Has The Necessary Supplies To Perform Its Required Function. The Vendor Shall Maintain A Record Of Installation To Include: Location, Model Number, Serial Number, And Date Of Installation. Removal: The Vendor Shall Un-install And Remove All Rented Equipment Under This Bpa From The Requesting Facility Upon Request. Equipment Shall Be Removed Within 30 Days Of Request. Equipment Shall Be Considered Removed Upon A Va Employee Certification That The Equipment And All Accessories Have Been Taken By An Employee Of The Vendor And There Is No Disruption And /or Damage To The Surrounding Area. The Vendor Shall Maintain A Record Of Removal To Include: Location, Model Number, Serial Number, And Date Of Removal. Equipment Requirements: Vendor Shall Provide Urinalysis Systems That Meet The Following Requirements: Instrument Shall Include Chemical Analysis Of Urine (to Include Bilirubin, Urobilinogen, Ph, Specific Gravity, Glucose, Protein, Blood, Nitrites, Ketones And Leukoesterase) Without Interference From Urines With Common Abnormal Colors (red, Orange, Etc.). Instrument Shall Also Identify Formed Elements Including But Not Limited To, Red Blood Cells, White Blood Cells, Epithelial Cells (differentiating Transitional, Renal, And Squamous) Crystals, Casts, Bacteria, And Yeast Without The Need To Consistently Verify With Manual Microscopy. There Must Be A Direct, Automated Specimen Pathway Between The Chemistry Urinalysis Specimen Sampling And Testing And The Microscopic Urinalysis Sampling And Testing. Equipment Shall Provide Accurate Test Assay Results For Sample Specimens Up To The Manufacturer's Defined Maximum Tests Per Hour Without Excessive Malfunctions, Breakdowns, Or Service Calls. Instrumentation Shall Have Auto Reflex Testing Capability For Specimens Which Require Sediment Analysis. System Shall Have A Minimum Throughput Of 60 Samples Per Hour On The Microscopic Side. The Instrument Shall Have Customer Defined Rule Criteria To Reduce The Number Of Manual Reviews And Off-line Testing Required By The Operator. The System Shall Have The Ability For Auto-validation, Should The Facility Choose To Auto Validate Results. Instrument Shall Auto-classify Formed Elements With Limited Review By The Operator. Microscopic Analysis Must Be Fully Quantitative. Microscopic Analysis Must Have The Ability For The Instrument To Identify Cellular Microscopic Components And Provide Reviewable Digital Images. Instrument Must Offer Limited To No Carryover From Sample To Sample To Reduce Interference. Instrument Must Have The Ability To Continuously Feed At Least 300 Chemistry Strips Without Operator Re-load. Time From Standby To Operation Processing Samples Is Less Than 3 Minutes. Time Required For Routine Maintenance Activities Shall Take Less Than 30 Minutes Daily And Less Than 30 Minutes Weekly/monthly. All Testing Shall Be Fda Approved, Including Body Fluids If Available. Current Waste Stream Analysis And Sds (safety Data Sheets) Shall Be Provided To All Locations. Editable Electronic Copy In Clsi (clinical And Laboratory Standards Institute) Format Of Operating Procedures Shall Be Furnished With Each Instrument Supplied To All Participating Facilities. Testing Shall Include Current Laboratory Assays, But The Va Reserves The Right To Add Additional Tests To Test Menu. Protocols In Place For Various Degrees Of Urine Turbidity. A Selection Of Instruments Will Be Available Based On Volume, Test Menu Needs And Throughput Requirements Of Each Individual Facility. Instrument Shall Allow Patient Sample To Be Used For Repeats Or Reruns On The Same Or Different Instrument. All Instruments Must Be New (non-refurbished) Equipment. Contractor Shall Provide All Upgrades To The Equipment Hardware And Operating System Software, At No Additional Cost To The Government. (note Current Va Security Regulations Require Windows Based Operating Systems Be Windows 10 Or Higher). Instruments That Have The Ability To Have Access To The Internet Must Follow Va It Security Policies. The Internet Access Must Be Verified And Adhered To Before And During All Internet Access. Contractor S Software Is Required To Be Compatible And Interface Immediately Upon Award With Governmental Systems Which Include Cprs, Vista, And Cerner. Contractor Must Provide Evidence With Their Solicitation Response That Their Software Is Already Accepted For Use By Vha It Systems. All Equipment Shall Come With Any Required Accessories To Perform Normal Duties, To Include But Not Limited To, Properly Programmed Printers And Monitors, And Ups. The Analyzers Will Be Va Laboratory Information System (lis) Interfaceable, And The Vendor Will Supply Lis Specifications And Assist With The Interface Connections. Operation Of Software Uses Minimal Computer Strokes To Move From Testing To Reagent To Data Analysis Or/and Other Screens. Size Of Instrumentation Shall Be No More Than 65 W X 21 D. If Stand Is Required, It Is Included In The Contract At No Additional Cost. Upgrades Shall Be Delivered And Installed Within 60 Days Of Issuance To The Commercial Market. An Operator's Manual Shall Be Furnished With Each Instrument Supplied To Va And Updates To Manual Shall Be Provided In A Timely Manner. Uptime Guarantee/ Performance Penalty: Vendor Agrees That All Equipment Provided Shall Be Operable And Available For Use No Less Than 98% Of Operational Time Per Month. Each Instrument At Site Shall Be Computed Separately. Operational Time Is 24 Hours Per Day 7 Days A Week. Downtime Is Defined As When The Vendor Is Not Able To Produce Clinically Acceptable Results On The System Monitor And Will Be Computed From The Time The Government Notified The Hotline During Normal Working Hours Until The Field Service Engineer Returns The Instrument To The Government And The Government Can Produce Acceptable Clinical Results. Scheduled Maintenance Is Excluded From Downtime. Method Validations: Once The Instrument Has Been Installed According To The Vendor Specifications At The Government Location The Vendor Will Supply A Technical Representative To Perform Method Validation Studies During All Equipment Installations At All Facilities. The Method Validations Will Be Completed To Include The Necessary Studies Required For Clinical Laboratory Information Act (clia), College Of American Pathologist (cap) And Department Of Veterans Affairs (va) Regulatory Agencies And Shall Include Precision, Linearity And Current System To New System Correlations As Well As Establishment Of Normal And Therapeutic Ranges. The Va Will Not Accept Equipment Until It Passes All Validation Testing. Validation Testing Will Be Conducted On The Facilities Primary And Secondary Testing Methods. The Va Will Provide All The Samples Necessary For The Validation Studies. Maintenance And Repairs: Vendor Shall Provide Preventative And Corrective Maintenance Per Manufacturer's Recommendation. This Shall Include Software Upgrades And Parts And Labor, To Maintain All Urinalysis Equipment And Accessories. At A Minimum, Preventative Maintenance Shall Be Twice Annually, Beginning Six (6) Months After Installation. Vendor Will Furnish All Transportation, Equipment, Tools And Labor To Accomplish The Required Maintenance. Emergency Repairs Shall Be Performed After Initial Telephone Notification That The Equipment Is Inoperative. The Field Service Representative Will Call To Schedule Onsite Service Within 2 Hours Of Notification From Technical Assistance Hotline If Necessary. The Vendor Shall Provide The Government With A Designated Point Of Contact And Telephone Number And Shall Make Arrangements To Enable His Maintenance Representative To Receive Such Notification. Telephone Service Support Shall Be Available 24 Hours/day,7days A Week. Onsite Field Service Support Shall Be Available Monday- Friday 8am- 4:30 Pm (local Time). Onsite Repairs Shall Be Initiated Within 24 Hours Of First Notification From Technical Hotline To Field Service Engineer. Efforts Shall Be Made By The Vendor To Minimize Disruption To Governments And Employees (i.e. Reschedule If Work Interferes With Normal Operation, Access Equipment When Convenient To The Needs Of The Va, Etc.) Vendor Shall Maintain Cleanliness Of Work Area And Minimize Dust And Contaminants To Areas Adjacent To The Job Site. Vendor Shall Furnish A Malfunction Incident Report To The Installation Upon Completion Of Repair Call Within 2 Business Days After The Completion Of Work. The Report Shall Include As A Minimum The Following: Date And Time Notified. Date And Time Of Arrival. Serial Number, Type And Model Number(s) Of Equipment. Time Spent For Repair. Description Of Malfunction And Repair. Proof Of Repair That Included Documentation Of A Sample Run Of Quality Control Verifying Acceptable Performance. Each Instrument Provided By The Vendor Shall Maintain An Uptime Of 98% In Each Month Of The Term Of The Agreement. During The Term Of The Contract, Should The Repair Record Of Any Individual Piece Of Laboratory Equipment Reflect A Downtime Of 5% Or Greater Of The Normal Working Days In One Calendar Month, It Is The Responsibility Of The Vendor To Immediately Replace The Broken Laboratory Equipment With New Equipment At No Additional Cost To The Government. The Responsibility For Maintaining The Equipment Furnished In Operating Condition In Accordance To Manufacturer's Instruction, Shall Solely Be The Responsibility Of The Vendor. The Contractor Shall Not Leave A Service Call Open Pending Verification That Repairs Are Completed By The Contractor's Maintenance Personnel. For Each Instrument Provided, The Vendor Shall Treat Each Notification For An Emergency/repair Service Call Form The Government As A Separate And New Service Call. The Following Are Guaranteed Throughout The Life Of This Contract: Priority Scheduling Of Requests For Service. Unlimited Emergency Service. No Charges For Labor, Travel Or Any Other Related Expenses. Unlimited Parts. No Charge For Replacement Parts Which Become Marginal Or Defective Due To Normal Use During Agreement Period. Factory Authorized Product Updates And Modifications. Installed At No Additional Charge For Improved Product Performance And Reliability. Factory Trained And Authorized Service Engineers. Continual Upgrading And Certification Of Engineers In Latest Instrument Technology. Training: With The Exception Of Specific Training Requirements Stated Herein, Which Shall Have Precedence; Vendor Shall Provide "operator" Training In Accordance With The Terms, Conditions, And Provisions Of The Vendor's Existing Federal Supply Service Contract. Listed Below Are The Training Requirements: The Vendor Shall Provide, At No Cost To The Government, On-site Training And Key Operator Training For At Least 2 Operators Per Instrument Per Site. Provide Initial In-depth Training For Two Key Operators At The Facility And For Each Individual Instrument Provided. Provide Annual Training For One Va Equipment Operator, Per Each Instrument, For The Participating Medical Center. Provide On-site Vendor Operator Training For All Personnel Who Will Run Instrument With Training Provided For All Applicable Shifts. The Vendor Shall Have An On-going Training Program For Employees By The Technical Service Representatives On Any New Products Or Updates On The Product Lines. All Materials For Training Will Be Provided At No Additional Cost To The Government. The Vendor Will Provide Competency Assessment Protocols For Use At Each Site Consistent With Federal (clia) And Cap Training Requirements. Reagents, Controls And Supplies: Routine Reagents, Controls And Disposables (supplies) For Chemical And Microscopic Urinalysis Testing Shall Be Provided By The Vendor And Shall Adhere To The Following Requirements. Reagents Including Controls And Disposables Shall Be Identified Prior To Delivery. Reagents Including Controls And Disposables To Be Listed In A Separate Table. The Table Should Include Annual Reagent Volumes, Costs, And Shipping Charges For Each Quarterly Standing Order Delivery. Reagent Manufacturer Shelf Life Shall Be No Less Than 12 Months. Reagents For The Analyzer Are Marked For Easy Recognition By The Operator And Shall Contain The Appropriate Facility Purchase Order Number In The Delivery Address. Vendor Will Supply A List Of Reagents, Controls And Disposables That Will Be Shipped As Part Of The Order. Supplies Will Be Shipped On A Standing Order Schedule, Agreed Upon By The Government And Vendor. All Or Part Of A Future Quarterly Standing Order May Be Advanced Up To 10 Days Ahead Of The Scheduled Ship Date Of The Standing Order. Delivery Shall Be Within Four (4) Business Days Of The Prior Agreed Upon Shipment Date Or It Shall Be Considered Late. Vendor Will Provide Sufficient Reagents And Supplies For Performance Of Patient Results For All Visn 20 Sites. Consumables Will Be Provided On Demand As Needed If The Consumable Allotments Are Insufficient To Meet The Needs Of The Facility. Vendor Shall Supply All Changes To The Maintenance Schedules That Affect Reagent Or Cleaning Reagent Volumes And Shall Be Coordinated With The Va Facility Point Of Contact To Implement The Changes In Accordance With Manufacturer's Recommendations. Space Availability: All Proposed Urinalysis Equipment Must Fit The Existing Space At Each Visn 20 P&lms Facility's, Without The Need For Renovation Work. Small Scale Re-arrangement Of Furniture Is Acceptable. Fitting Existing Space Shall Include Conforming To The Current Structural Parameters Of Each Lab, In Each Facility, In Terms Of Delivery, Installation And Lab Space. (i.e., Equipment Size, Weight, Packaged Size For Delivery, Electrical/voltage). Special Requirements: In Addition To The General Requirements For The Urinalysis Cprr Requirements Stated Above, The Contractor Shall Meet The Following Special Requirements: Equipment Shall Have A Fully Established Va Veterans Health Information Systems And Technology Architecture (vista) Computer System And Cerner Interface Program Via Data Innovations Middleware, With All Downloads/software Necessary To Transfer Data Into Patient Files In Va Vista And Cerner Computer Systems Via Data Innovations Middleware, At No Additional Cost To Va. Provide Bi-directional Interface With Data Innovations And Appropriate Quality Control Analysis System And All Components Necessary To Interface With Va Vista And Cerner Computer System. The Contractor Shall Provide An Auto Verification Package Through Data Innovations For Validation Utilizing The Instrument Manager Which Includes Rules And Technical Support For The Duration Of This Contract. Contractor Shall Assist In The Establishment, Testing, Deployment, And Troubleshooting In The Full Capacity Of The Middleware Before Implementation Date. The Contractor Is Responsible For Verifying Any Software Upgrades With The Instrument During Its Life, Will Be Compatible With Data Innovations Middleware. Contractor Shall Provide Automated, Walk-away Urinalysis Chemistry Analyzer With Peripherals With Direct, Automated Sample Pathway To An Automated, Walk-away Microscopic Urinalysis Analyzer With Peripherals For Sampling And Testing. Shall Provide Data Backup. Systems Shall Provide Ease Of Use (uncomplicated Menus), With Minimal Maintenance Required. Shall Provide Flexibility In Test Volumes. Shall Be Easy To Troubleshoot. Provide Extended Expiration Date Of Supplies. Uninterruptible Power Supply (surge Protection, Battery Backup) Provided By Vendor For All Associated Electrical Instruments And Ancillary Components Excluding Printer. Provide A Water System, If Required. If A Printer Is Required To Produce Patient Or Qc Reports, One Shall Be Provided Per System And Replaced If Broken. Cessation Of Testing: If, For Any Reason, Contractor Ceases Testing Of Any Urinalysis Assays, The Contractor Must Notify The Va Contracting Office And Laboratories, 60 Calendar Days Prior To The Change. Until A New Solicitation Can Be Issued, Or The Problem Resolved, The Contractor Shall Be Held Liable For All Costs If Performance Is Ceased, As The Lab Facility May Have To Resort To Outsourcing The Tests In Order To Continue Patient Care. The Vendor Will Be Responsible For The Following: Cost Per Reportable Result Program Reagents, Controls And Supplies: Routine Reagents And Disposables. Reagents Including Controls And Disposables To Be Listed In Separate Table. Vendor Will Supply A List Of Reagents, Controls And Disposables That Will Be Shipped As Part Of The Agreement. Supplies Will Be Shipped On A Standing Order Schedule, Agreed Upon By Government And Vendor. All Or Part Of A Future Quarterly Standing Order May Be Advanced Up To 10 Days Ahead Of The Scheduled Ship Date Of The Standing Order. Vendor Will Provide Sufficient Reagents And Supplies For Performance Of Patient Results For All Visn 20 Sites. The Quality Of The Products Shall Be High Enough To Satisfy Proficiency Testing Standards Of The College Of American Pathologists (cap) And The Joint Commission (tjc). Changes In Maintenance Schedules That Affect Reagent Or Cleaning Reagent Volumes Will Be Approved By The Vendor In Accordance With Manufacturer's Recommendations. Additional Reagents, If Required, Will Be Provided By The Vendor At No Additional Charge. The Government Will Be Responsible For The Following: Cost Per Reportable Result Program: Cppr Periodic Payments: Refer To Attachment A For Volumes. Test Description Estimated Volume Per Year Price Per Reportable. During The Agreement The Government Will Report By The 10th Of Each Month, To The Vendor In Writing Or Electronically, The Number Of Reportable Results Generated In The Previous Month. The Vendor Will Invoice The Government Based On The Report Of Reportable Tests. Laboratory Manager Or Designee Will Act As Contracting Officer Representative (cotr) For This Contract. Security: Returning Leased Equipment Constitutes A Risk. Va Employees Must Sanitize Va Sensitive Information Residing On Leased Equipment Before Releasing That Equipment From Direct Va Control, Or The Media Will Not Be Returned Upon Termination Of The Contract. Per Visn 20 Va Information Security Policies, No Hard Drives Or Computer Disks Containing Va Patient Information Will Be Removed From Va Facilities. At The Time Of Turn-in Or Removal Due To Failure, The Va Facility Will Remove All Sensitive Data From Information Systems Storage Devices Or Render The Data From These Systems Unreadable. No Federal Information Processing Equipment Will Be Discontinued From Rental/lease Or Exchange Without Compliance With This Require. Contract Personnel Will Not Have Direct Access To A Va System Or Va Sensitive Information. All Work/maintenance Will Be Accomplished By Va Laboratory Personnel As An Intermediary. If Contract Leased/purchased Equipment Contains Sensitive Information (pii/phi) To Be Directly Uploaded To/downloaded From Va Systems, A Mou/isa Shall Be Established Between The Vendor And Va. Unidirectional, Deidentified Data From Contract Leased/purchased Equipment To The Va Network Shall Be Protected In Accordance With Established Va Security Policy. Quality Assurance Monitoring: The Contractor Service Requirements Are Summarized Into Performance Objectives That Relate Directly To Mission Essential Items. The Performance Thresholds Briefly Describe The Minimum Acceptable Levels Of Service Required For Each Requirement. These Thresholds Are Critical To Mission Success. Information And Information System Security/privacy General Contractors, Contractor Personnel, Subcontractors, And Subcontractor Personnel Shall Be Subject To The Same Federal Laws, Regulations, Standards, And Va Directives And Handbooks As Va And Va Personnel Regarding Information And Information System Security. Access To Va Information And Va Information Systems A Contractor/subcontractor Shall Request Logical (technical) Or Physical Access To Va Information And Va Information Systems For Their Employees, Subcontractors, And Affiliates Only To The Extent Necessary To Perform The Services Specified In The Contract, Agreement, Or Task Order. All Contractors, Subcontractors, And Third-party Servicers And Associates Working With Va Information Are Subject To The Same Investigative Requirements As Those Of Va Appointees Or Employees Who Have Access To The Same Types Of Information. The Level And Process Of Background Security Investigations For Contractors Must Be In Accordance With Va Directive And Handbook 0710, Personnel Suitability And Security Program. The Office For Operations, Security, And Preparedness Is Responsible For These Policies And Procedures. Contract Personnel Who Require Access To National Security Programs Must Have A Valid Security Clearance. National Industrial Security Program (nisp) Was Established By Executive Order 12829 To Ensure That Cleared U.s. Defense Industry Contract Personnel Safeguard The Classified Information In Their Possession While Performing Work On Contracts, Programs, Bids, Or Research And Development Efforts. The Department Of Veterans Affairs Does Not Have A Memorandum Of Agreement With Defense Security Service (dss). Verification Of A Security Clearance Must Be Processed Through The Special Security Officer Located In The Planning And National Security Service Within The Office Of Operations, Security, And Preparedness. Custom Software Development And Outsourced Operations Must Be Located In The U.s. To The Maximum Extent Practical. If Such Services Are Proposed To Be Performed Abroad And Are Not Disallowed By Other Va Policy Or Mandates, The Contractor/subcontractor Must State Where All Non-u.s. Services Are Provided And Detail A Security Plan, Deemed To Be Acceptable By Va, Specifically To Address Mitigation Of The Resulting Problems Of Communication, Control, Data Protection, And So Forth. Location Within The U.s. May Be An Evaluation Factor. The Contractor Or Subcontractor Must Notify The Contracting Officer Immediately When An Employee Working On A Va System Or With Access To Va Information Is Reassigned Or Leaves The Contractor Or Subcontractor's Employ. The Contracting Officer Must Also Be Notified Immediately By The Contractor Or Subcontractor Prior To An Unfriendly Termination. Va Information Custodial Language Information Made Available To The Contractor Or Subcontractor By Va For The Performance Or Administration Of This Contract Or Information Developed By The Contractor/subcontractor In Performance Or Administration Of The Contract Shall Be Used Only For Those Purposes And Shall Not Be Used In Any Other Way Without The Prior Written Agreement Of The Va. This Clause Expressly Limits The Contractor/subcontractor's Rights To Use Data As Described In Rights In Data - General, Far 52.227-14(d) (1). Va Information Should Not Be Co-mingled, If Possible, With Any Other Data On The Contractors/subcontractor's Information Systems Or Media Storage Systems In Order To Ensure Va Requirements Related To Data Protection And Media Sanitization Can Be Met. If Co-mingling Must Be Allowed To Meet The Requirements Of The Business Need, The Contractor Must Ensure That Va's Information Is Returned To The Va Or Destroyed In Accordance With Va's Sanitization Requirements. Va Reserves The Right To Conduct On Site Inspections Of Contractor And Subcontractor It Resources To Ensure Data Security Controls, Separation Of Data And Job Duties, And Destruction/media Sanitization Procedures Are In Compliance With Va Directive Requirements. Prior To Termination Or Completion Of This Contract, Contractor/ Subcontractor Must Not Destroy Information Received From Va, Or Gathered/ Created By The Contractor In The Course Of Performing This Contract Without Prior Written Approval By The Va. Any Data Destruction Done On Behalf Of Va By A Contractor/subcontractor Must Be Done In Accordance With National Archives And Records Administration (nara) Requirements As Outlined In Va Directive 6300, Records And Information Management And Its Handbook 6300.1 Records Management Procedures, Applicable Va Records Control Schedules, And Va Handbook 6500.1, Electronic Media Sanitization. Self-certification By The Contractor That The Data Destruction Requirements Above Have Been Met Must Be Sent To The Va Contracting Officer Within 30 Days Of Termination Of The Contract. The Contractor/subcontractor Must Receive, Gather, Store, Back Up, Maintain, Use, Disclose And Dispose Of Va Information Only In Compliance With The Terms Of The Contract And Applicable Federal And Va Information Confidentiality And Security Laws, Regulations, And Policies. If Federal Or Va Information Confidentiality And Security Laws, Regulations And Policies Become Applicable To The Va Information Or Information Systems After Execution Of The Contract, Or If Nist Issues Or Updates Applicable Fips Or Special Publications (sp) After Execution Of This Contract, The Parties Agree To Negotiate In Good Faith To Implement The Information Confidentiality And Security Laws, Regulations, And Policies In This Contract. The Contractor/subcontractor Shall Not Make Copies Of Va Information Except As Authorized And Necessary To Perform The Terms Of The Agreement Or To Preserve Electronic Information Stored On Contractor/subcontractor Electronic Storage Media For Restoration In Case Any Electronic Equipment Or Data Used By The Contractor/subcontractor Needs To Be Restored To An Operating State. If Copies Are Made For Restoration Purposes, After The Restoration Is Complete, The Copies Must Be Appropriately Destroyed. If Va Determines That The Contractor Has Violated Any Of The Information Confidentiality, Privacy, And Security Provisions Of The Contract, It Shall Be Sufficient Grounds For Va To Withhold Payment To The Contractor Or Third Party Or Terminate The Contract For Default Or Terminate For Cause Under Federal Acquisition Regulation (far) Part 12. If A Vha Contract Is Terminated For Cause, The Associated Baa Must Also Be Terminated And Appropriate Actions Taken In Accordance With Vha Handbook 1600.01, Business Associate Agreements. Absent An Agreement To Use Or Disclose Protected Health Information, There Is No Business Associate Relationship. The Contractor/subcontractor Must Store, Transport, Or Transmit Va Sensitive Information In An Encrypted Form, Using Va-approved Encryption Tools That Are, At A Minimum, Fips 140-2 Validated. The Contractor/subcontractor's Firewall And Web Services Security Controls, If Applicable, Shall Meet Or Exceed Va's Minimum Requirements. Va Configuration Guidelines Are Available Upon Request. Except For Uses And Disclosures Of Va Information Authorized By This Contract For Performance Of The Contract, The Contractor/subcontractor May Use And Disclose Va Information Only In Two Other Situations: (i) In Response To A Qualifying Order Of A Court Of Competent Jurisdiction, Or (ii) With Va's Prior Written Approval. The Contractor/subcontractor Must Refer All Requests For, Demands For Production Of, Or Inquiries About, Va Information And Information Systems To The Va Contracting Officer For Response. Notwithstanding The Provision Above, The Contractor/subcontractor Shall Not Release Va Records Protected By Title 38 U.s.c. 5705, Confidentiality Of Medical Quality Assurance Records And/or Title 38 U.s.c. 7332, Confidentiality Of Certain Health Records Pertaining To Drug Addiction, Sickle Cell Anemia, Alcoholism Or Alcohol Abuse, Or Infection With Human Immunodeficiency Virus. If The Contractor/subcontractor Is In Receipt Of A Court Order Or Other Requests For The Above Mentioned Information, That Contractor/subcontractor Shall Immediately Refer Such Court Orders Or Other Requests To The Va Contracting Officer For Response. For Service That Involves The Storage, Generating, Transmitting, Or Exchanging Of Va Sensitive Information But Does Not Require C&a Or An Mou-isa For System Interconnection, The Contractor/subcontractor Must Complete A Contractor Security Control Assessment (csca) On A Yearly Basis And Provide It To The Cor. Information System Design And Development Information Systems That Are Designed Or Developed For Or On Behalf Of Va At Non-va Facilities Shall Comply With All Va Directives Developed In Accordance With Fisma, Hipaa, Nist, And Related Va Security And Privacy Control Requirements For Federal Information Systems. This Includes Standards For The Protection Of Electronic Phi, Outlined In 45 C.f.r. Part 164, Subpart C, Information And System Security Categorization Level Designations In Accordance With Fips 199 And Fips 200 With Implementation Of All Baseline Security Controls Commensurate With The Fips 199 System Security Categorization (reference Appendix D Of Va Handbook 6500, Va Information Security Program). During The Development Cycle A Privacy Impact Assessment (pia) Must Be Completed, Provided To The Cor, And Approved By The Va Privacy Service In Accordance With Directive 6507, Va Privacy Impact Assessment. The Contractor/subcontractor Shall Certify To The Cor That Applications Are Fully Functional And Operate Correctly As Intended On Systems Using The Va Federal Desktop Core Configuration (fdcc), And The Common Security Configuration Guidelines Provided By Nist Or The Va. This Includes Internet Explorer 7 Configured To Operate On Windows Xp And Vista (in Protected Mode On Vista) And Future Versions, As Required. The Standard Installation, Operation, Maintenance, Updating, And Patching Of Software Shall Not Alter The Configuration Settings From The Va Approved And Fdcc Configuration. Information Technology Staff Must Also Use The Windows Installer Service For Installation To The Default "program Files" Directory And Silently Install And Uninstall. Applications Designed For Normal End Users Shall Run In The Standard User Context Without Elevated System Administration Privileges. The Security Controls Must Be Designed, Developed, Approved By Va, And Implemented In Accordance With The Provisions Of Va Security System Development Life Cycle As Outlined In Nist Special Publication 800-37, Guide For Applying The Risk Management Framework To Federal Information Systems, Va Handbook 6500, Information Security Program And Va Handbook 6500.5, Incorporating Security And Privacy In System Development Lifecycle. The Contractor/subcontractor Is Required To Design, Develop, Or Operate A System Of Records Notice (sor) On Individuals To Accomplish An Agency Function Subject To The Privacy Act Of 1974, (as Amended), Public Law 93-579, December 31, 1974 (5 U.s.c. 552a) And Applicable Agency Regulations. Violation Of The Privacy Act May Involve The Imposition Of Criminal And Civil Penalties. The Contractor/subcontractor Agrees To: Comply With The Privacy Act Of 1974 (the Act) And The Agency Rules And Regulations Issued Under The Act In The Design, Development, Or Operation Of Any System Of Records On Individuals To Accomplish An Agency Function When The Contract Specifically Identifies: The Systems Of Records (sor); And The Design, Development, Or Operation Work That The Contractor/ Subcontractor Is To Perform Include The Privacy Act Notification Contained In This Contract In Every Solicitation And Resulting Subcontract And In Every Subcontract Awarded Without A Solicitation, When The Work Statement In The Proposed Subcontract Requires The Redesign, Development, Or Operation Of A Sor On Individuals That Is Subject To The Privacy Act; And Include This Privacy Act Clause, Including This Subparagraph (3), In All Subcontracts Awarded Under This Contract Which Requires The Design, Development, Or Operation Of Such A Sor. In The Event Of Violations Of The Act, A Civil Action May Be Brought Against The Agency Involved When The Violation Concerns The Design, Development, Or Operation Of A Sor On Individuals To Accomplish An Agency Function, And Criminal Penalties May Be Imposed Upon The Officers Or Employees Of The Agency When The Violation Concerns The Operation Of A Sor On Individuals To Accomplish An Agency Function. For Purposes Of The Act, When The Contract Is For The Operation Of A Sor On Individuals To Accomplish An Agency Function, The Contractor/subcontractor Is Considered To Be An Employee Of The Agency. "operation Of A System Of Records" Means Performance Of Any Of The Activities Associated With Maintaining The Sor, Including The Collection, Use, Maintenance, And Dissemination Of Records. "record" Means Any Item, Collection, Or Grouping Of Information About An Individual That Is Maintained By An Agency, Including, But Not Limited To, Education, Financial Transactions, Medical History, And Criminal Or Employment History And Contains The Person's Name, Or Identifying Number, Symbol, Or Any Other Identifying Particular Assigned To The Individual, Such As A Fingerprint Or Voiceprint, Or A Photograph. "system Of Records" Means A Group Of Any Records Under The Control Of Any Agency From Which Information Is Retrieved By The Name Of The Individual Or By Some Identifying Number, Symbol, Or Other Identifying Particular Assigned To The Individual. The Vendor Shall Ensure The Security Of All Procured Or Developed Systems And Technologies, Including Their Subcomponents (hereinafter Referred To As "systems"), Throughout The Life Of This Contract And Any Extension, Warranty, Or Maintenance Periods. This Includes, But Is Not Limited To Workarounds, Patches, Hotfixes, Upgrades, And Any Physical Components (hereafter Referred To As Security Fixes) Which May Be Necessary To Fix All Security Vulnerabilities Published Or Known To The Vendor Anywhere In The Systems, Including Operating Systems And Firmware. The Vendor Shall Ensure That Security Fixes Shall Not Negatively Impact The Systems. The Vendor Shall Notify Va Within 24 Hours Of The Discovery Or Disclosure Of Successful Exploits Of The Vulnerability Which Can Compromise The Security Of The Systems (including The Confidentiality Or Integrity Of Its Data And Operations, Or The Availability Of The System). Such Issues Shall Be Remediated As Quickly As Is Practical, But In No Event Longer Than 10 Days. When The Security Fixes Involve Installing Third Party Patches (such As Microsoft Os Patches Or Adobe Acrobat), The Vendor Will Provide Written Notice To The Va That The Patch Has Been Validated As Not Affecting The Systems Within 10 Working Days. When The Vendor Is Responsible For Operations Or Maintenance Of The Systems, They Shall Apply The Security Fixes Within 10 Days. All Other Vulnerabilities Shall Be Remediated As Specified In This Paragraph In A Timely Manner Based On Risk, But Within 60 Days Of Discovery Or Disclosure. Exceptions To This Paragraph (e.g. For The Convenience Of Va) Shall Only Be Granted With Approval Of The Contracting Officer And The Va Assistant Secretary For Office Of Information And Technology. Information System Hosting, Operation, Maintenance, Or Use For Information Systems That Are Hosted, Operated, Maintained, Or Used On Behalf Of Va At Non-va Facilities, Contractors/subcontractors Are Fully Responsible And Accountable For Ensuring Compliance With All Hipaa, Privacy Act, Fisma, Nist, Fips, And Va Security And Privacy Directives And Handbooks. This Includes Conducting Compliant Risk Assessments, Routine Vulnerablity Scanning, System Patching And Change Management Procedures, And The Completion Of An Acceptable Contingency Plan For Each System. The Contractor's Security Control Procedures Must Be Equivalent, To Those Procedures Used To Secure Va Systems. A Privacy Impact Assessment (pia) Must Also Be Provided To The Cor And Approved By Va Privacy Service Prior To Operational Approval. All External Internet Connections To Va's Network Involving Va Information Must Be Reviewed And Approved By Va Prior To Implementation. Adequate Security Controls For Collecting, Processing, Transmitting, And Storing Of Personally Identifiable Information (pii), As Determined By The Va Privacy Service, Must Be In Place, Tested, And Approved By Va Prior To Hosting, Operation, Maintenance, Or Use Of The Information System, Or Systems By Or On Behalf Of Va. These Security Controls Are To Be Assessed And Stated Within The Pia And If These Controls Are Determined Not To Be In Place, Or Inadequate, A Plan Of Action And Milestones (poa&m) Must Be Submitted And Approved Prior To The Collection Of Pii. Outsourcing (contractor Facility, Contractor Equipment Or Contractor Staff) Of Systems Or Network Operations, Telecommunications Services, Or Other Managed Services Requires Certification And Accreditation (authorization) (c&a) Of The Contractor's Systems In Accordance With Va Handbook 6500.3, Certification And Accreditation And/or The Va Ocs Certification Program Office. Government- Owned (government Facility Or Government Equipment) Contractor-operated Systems, Third Party Or Business Partner Networks Require Memorandums Of Understanding And Interconnection Agreements (mou-isa) Which Detail What Data Types Are Shared, Who Has Access, And The Appropriate Level Of Security Controls For All Systems Connected To Va Networks. The Contractor/subcontractor's System Must Adhere To All Fisma, Fips, And Nist Standards Related To The Annual Fisma Security Controls Assessment And Review And Update The Pia. Any Deficiencies Noted During This Assessment Must Be Provided To The Va Contracting Officer And The Iso For Entry Into Va's Poa&m Management Process. The Contractor/subcontractor Must Use Va's Poa&m Process To Document Planned Remedial Actions To Address Any Deficiencies In Information Security Policies, Procedures, And Practices, And The Completion Of Those Activities. Security Deficiencies Must Be Corrected Within The Timeframes Approved By The Government. Contractor/subcontractor Procedures Are Subject To Periodic, Unannounced Assessments By Va Officials, Including The Va Office Of Inspector General. The Physical Security Aspects Associated With Contractor/ Subcontractor Activities Must Also Be Subject To Such Assessments. If Major Changes To The System Occur That May Affect The Privacy Or Security Of The Data Or The System, The C&a Of The System May Need To Be Reviewed, Retested And Re- Authorized Per Va Handbook 6500.3. This May Require Reviewing And Updating All Of The Documentation (pia, System Security Plan, Contingency Plan). The Certification Program Office Can Provide Guidance On Whether A New C&a Would Be Necessary. The Contractor/subcontractor Must Conduct An Annual Self Assessment On All Systems And Outsourced Services As Required. Both Hard Copy And Electronic Copies Of The Assessment Must Be Provided To The Cor. The Government Reserves The Right To Conduct Such An Assessment Using Government Personnel Or Another Contractor/subcontractor. The Contractor/subcontractor Must Take Appropriate And Timely Action (this Can Be Specified In The Contract) To Correct Or Mitigate Any Weaknesses Discovered During Such Testing, Generally At No Additional Cost. Va Prohibits The Installation And Use Of Personally-owned Or Contractor/ Subcontractor- Owned Equipment Or Software On Va's Network. If Non-va Owned Equipment Must Be Used To Fulfill The Requirements Of A Contract, It Must Be Stated In The Service Agreement, Sow Or Contract. All Of The Security Controls Required For Government Furnished Equipment (gfe) Must Be Utilized In Approved Other Equipment (oe) And Must Be Funded By The Owner Of The Equipment. All Remote Systems Must Be Equipped With, And Use, A Va-approved Antivirus (av) Software And A Personal (host-based Or Enclave Based) Firewall That Is Configured With A Va- Approved Configuration. Software Must Be Kept Current, Including All Critical Updates And Patches. Owners Of Approved Oe Are Responsible For Providing And Maintaining The Anti-viral Software And The Firewall On The Non-va Owned Oe. All Electronic Storage Media Used On Non-va Leased Or Non-va Owned It Equipment That Is Used To Store, Process, Or Access Va Information Must Be Handled In Adherence With Va Handbook 6500.1, Electronic Media Sanitization Upon: (i) Completion Or Termination Of The Contract Or (ii) Disposal Or Return Of The It Equipment By The Contractor/subcontractor Or Any Person Acting On Behalf Of The Contractor/subcontractor, Whichever Is Earlier. Media (hard Drives, Optical Disks, Cds, Back-up Tapes, Etc.) Used By The Contractors/ Subcontractors That Contain Va Information Must Be Returned To The Va For Sanitization Or Destruction Or The Contractor/subcontractor Must Self-certify That The Media Has Been Disposed Of Per 6500.1 Requirements. This Must Be Completed Within 30 Days Of Termination Of The Contract. Bio-medical Devices And Other Equipment Or Systems Containing Media (hard Drives, Optical Disks, Etc.) With Va Sensitive Information Must Not Be Returned To The Vendor At The End Of Lease, For Trade-in, Or Other Purposes. The Options Are: Vendor Must Accept The System Without The Drive; Va's Initial Medical Device Purchase Includes A Spare Drive Which Must Be Installed In Place Of The Original Drive At Time Of Turn-in; Or Va Must Reimburse The Company For Media At A Reasonable Open Market Replacement Cost At Time Of Purchase. Due To The Highly Specialized And Sometimes Proprietary Hardware And Software Associated With Medical Equipment/systems, If It Is Not Possible For The Va To Retain The Hard Drive, Then; The Equipment Vendor Must Have An Existing Baa If The Device Being Traded In Has Sensitive Information Stored On It And Hard Drive(s) From The System Are Being Returned Physically Intact; And Any Fixed Hard Drive On The Device Must Be Non-destructively Sanitized To The Greatest Extent Possible Without Negatively Impacting System Operation. Selective Clearing Down To Patient Data Folder Level Is Recommended Using Va Approved And Validated Overwriting Technologies/methods/tools. Applicable Media Sanitization Specifications Need To Be Pre- Approved And Described In The Purchase Order Or Contract. A Statement Needs To Be Signed By The Director (system Owner) That States That The Drive Could Not Be Removed And That (a) And (b) Controls Above Are In Place And Completed. The Iso Needs To Maintain The Documentation. Security Incident Investigation The Term "security Incident" Means An Event That Has, Or Could Have, Resulted In Unauthorized Access To, Loss Or Damage To Va Assets, Or Sensitive Information, Or An Action That Breaches Va Security Procedures. The Contractor/ Subcontractor Shall Immediately Notify The Cor And Simultaneously, The Designated Iso And Privacy Officer For The Contract Of Any Known Or Suspected Security/privacy Incidents, Or Any Unauthorized Disclosure Of Sensitive Information, Including That Contained In System(s) To Which The Contractor/ Subcontractor Has Access. To The Extent Known By The Contractor/subcontractor, The Contractor/ Subcontractor's Notice To Va Shall Identify The Information Involved, The Circumstances Surrounding The Incident (including To Whom, How, When, And Where The Va Information Or Assets Were Placed At Risk Or Compromised), And Any Other Information That The Contractor/subcontractor Considers Relevant. With Respect To Unsecured Protected Health Information, The Business Associate Is Deemed To Have Discovered A Data Breach When The Business Associate Knew Or Should Have Known Of A Breach Of Such Information. Upon Discovery, The Business Associate Must Notify The Covered Entity Of The Breach. Notifications Need To Be Made In Accordance With The Executed Business Associate Agreement. In Instances Of Theft Or Break-in Or Other Criminal Activity, The Contractor/subcontractor Must Concurrently Report The Incident To The Appropriate Law Enforcement Entity (or Entities) Of Jurisdiction, Including The Va Oig And Security And Law Enforcement. The Contractor, Its Employees, And Its Subcontractors And Their Employees Shall Cooperate With Va And Any Law Enforcement Authority Responsible For The Investigation And Prosecution Of Any Possible Criminal Law Violation(s) Associated With Any Incident. The Contractor/subcontractor Shall Cooperate With Va In Any Civil Litigation To Recover Va Information, Obtain Monetary Or Other Compensation From A Third Party For Damages Arising From Any Incident, Or Obtain Injunctive Relief Against Any Third Party Arising From, Or Related To, The Incident. Liquidated Damages For Data Breach Consistent With The Requirements Of 38 U.s.c. 5725, A Contract May Require Access To Sensitive Personal Information. If So, The Contractor Is Liable To Va For Liquidated Damages In The Event Of A Data Breach Or Privacy Incident Involving Any Spi The Contractor/subcontractor Processes Or Maintains Under This Contract. The Contractor/subcontractor Shall Provide Notice To Va Of A "security Incident" As Set Forth In The Security Incident Investigation Section Above. Upon Such Notification, Va Must Secure From A Non-department Entity Or The Va Office Of Inspector General An Independent Risk Analysis Of The Data Breach To Determine The Level Of Risk Associated With The Data Breach For The Potential Misuse Of Any Sensitive Personal Information Involved In The Data Breach. The Term 'data Breach' Means The Loss, Theft, Or Other Unauthorized Access, Or Any Access Other Than That Incidental To The Scope Of Employment, To Data Containing Sensitive Personal Information, In Electronic Or Printed Form, That Results In The Potential Compromise Of The Confidentiality Or Integrity Of The Data. Contractor Shall Fully Cooperate With The Entity Performing The Risk Analysis. Failure To Cooperate May Be Deemed A Material Breach And Grounds For Contract Termination. Each Risk Analysis Shall Address All Relevant Information Concerning The Data Breach, Including The Following: Nature Of The Event (loss, Theft, Unauthorized Access); Description Of The Event, Including: Date Of Occurrence; Data Elements Involved, Including Any Pii, Such As Full Name, Social Security Number, Date Of Birth, Home Address, Account Number, Disability Code; Number Of Individuals Affected Or Potentially Affected; Names Of Individuals Or Groups Affected Or Potentially Affected; Ease Of Logical Data Access To The Lost, Stolen Or Improperly Accessed Data In Light Of The Degree Of Protection For The Data, E.g., Unencrypted, Plain Text; Amount Of Time The Data Has Been Out Of Va Control; The Likelihood That The Sensitive Personal Information Will Or Has Been Compromised (made Accessible To And Usable By Unauthorized Persons); Known Misuses Of Data Containing Sensitive Personal Information, If Any; Assessment Of The Potential Harm To The Affected Individuals; Data Breach Analysis As Outlined In 6500.2 Handbook, Management Of Security And Privacy Incidents, As Appropriate; And Whether Credit Protection Services May Assist Record Subjects In Avoiding Or Mitigating The Results Of Identity Theft Based On The Sensitive Personal Information That May Have Been Compromised. Based On The Determinations Of The Independent Risk Analysis, The Contractor Shall Be Responsible For Paying To The Va Liquidated Damages In The Amount Of $42.00 Per Affected Individual To Cover The Cost Of Providing Credit Protection Services To Affected Individuals Consisting Of The Following: Notification; One Year Of Credit Monitoring Services Consisting Of Automatic Daily Monitoring Of At Least 3 Relevant Credit Bureau Reports; Data Breach Analysis; Fraud Resolution Services, Including Writing Dispute Letters, Initiating Fraud Alerts And Credit Freezes, To Assist Affected Individuals To Bring Matters To Resolution; One Year Of Identity Theft Insurance With $20,000.00 Coverage At $0 Deductible; And Necessary Legal Expenses The Subjects May Incur To Repair Falsified Or Damaged Credit Records, Histories, Or Financial Affairs. Security Controls Compliance Testing On A Periodic Basis, Va, Including The Office Of Inspector General, Reserves The Right To Evaluate Any Or All Of The Security Controls And Privacy Practices Implemented By The Contractor Under The Clauses Contained Within The Contract. With 10 Working-day's Notice, At The Request Of The Government, The Contractor Must Fully Cooperate And Assist In A Government-sponsored Security Controls Assessment At Each Location Wherein Va Information Is Processed Or Stored, Or Information Systems Are Developed, Operated, Maintained, Or Used On Behalf Of Va, Including Those Initiated By The Office Of Inspector General. The Government May Conduct A Security Control Assessment On Shorter Notice (to Include Unannounced Assessments) As Determined By Va In The Event Of A Security Incident Or At Any Other Time. Training All Contractor Employees And Subcontractor Employees Requiring Access To Va Information And Va Information Systems Shall Complete The Following Before Being Granted Access To Va Information And Its Systems: Sign And Acknowledge (either Manually Or Electronically) Understanding Of And Responsibilities For Compliance With The Contractor Rules Of Behavior, Appendix E Relating To Access To Va Information And Information Systems; Successfully Complete The Va Cyber Security Awareness And Rules Of Behavior Training And Annually Complete Required Security Training; Successfully Complete The Appropriate Va Privacy Training And Annually Complete Required Privacy Training; And Successfully Complete Any Additional Cyber Security Or Privacy Training, As Required For Va Personnel With Equivalent Information System Access [to Be Defined By The Va Program Official And Provided To The Contracting Officer For Inclusion In The Solicitation Document - E.g., Any Role-based Information Security Training Required In Accordance With Nist Special Publication 800-16, Information Technology Security Training Requirements.] The Contractor Shall Provide To The Contracting Officer And/or The Cor A Copy Of The Training Certificates And Certification Of Signing The Contractor Rules Of Behavior For Each Applicable Employee Within 1 Week Of The Initiation Of The Contract And Annually Thereafter, As Required. Failure To Complete The Mandatory Annual Training And Sign The Rules Of Behavior Annually, Within The Timeframe Required, Is Grounds For Suspension Or Termination Of All Physical Or Electronic Access Privileges And Removal From Work On The Contract Until Such Time As The Training And Documents Are Complete.
Department Of Education Division Of Quezon Tender
Machinery and Tools
Philippines
Closing Date13 Jan 2025
Tender AmountPHP 626.1 K (USD 10.7 K)
Details: Description Bids And Awards Committee Rfq No. 2025-03-rfqg Date: Januay 8, 2025 Request For Quotation The Department Of Education, Division Of Quezon, Through Its Bids And Awards Committee (bac), Will Undertake An Alternative Method Of Procurement Through Small Value Procurement For The “supply And Delivery Of Common-use Supplies, Materials And Equipment For Q4 Of Fy 2024, Lot No. 1 (repost)” In Accordance With Section 53.9 Of The Implementing Rules And Regulations Of Republic Act No. 9184 Name Of Project : Supply And Delivery Of Common-use Supplies, Materials And Equipment For Q4 Of Fy 2024, Lot No. 1 (repost) Approved Budget For The Contract : Six Hundred Twenty Six Thousand One Hundred Fifty Five Pesos & 14/100 (php626,155.14) Specifications : See Attached Annex “b” For The Technical Specifications Location : Talipan, Pagbilao, Quezon Delivery Term : 15 Cd Upon Receipt Of Purchase Order Interested Suppliers Are Required To Submit Their Valid And Current Mayor’s Permit, Income/business Tax Return (for Abcs Above Php500k), Philgeps Registration, Dti Or Sec Registration, Bir Certificate Of Registration And Original Notarized Omnibus Sworm Statement, And Original Special Power Of Attorney Of The Owner Or All Members Of The Joint Venture Giving Full Power And Authority To Its Officer Or Designated Person To Sign The Oss And Do Acts To Represent The Bidder, Upon Submission Of Quotation. Award Of Contract Shall Be Made To The Lowest Quotation, Which Complies With The Minimum Description As Stated Above And Other Tems And Conditions Stated In The Price Quotation Form. Any Interlineations, Erasures Or Overwriting Shall Be Valid Only If There Are Signed Or Initialed By The Bidder Or His/her Duly Authorized Representative/s. Submission Of Quotation And Eligibility Documents Is On Or Before 3:00 P.m. Of January 13, 2025 At Deped, Division Of Quezon, Talipan, Pagbilao, Quezon. Please Submit Your Quotation In A Sealed Envelope Addressed To: Joepi F. Falqueza Bac Chairman Deped, Division Of Quezon Talipan, Pagbilao, Quezon You May Also Download The Quotation Form At Www.depedquezon.com.ph. For Inquiries, You May Contact Us At Tel. No. 042-784-0366 And Look For Hilariona E. Coronado. Very Truly Yours, (sgd)joepi F. Falqueza Bac Chairman Approved Budget For The Contract Supply And Delivery Of Common-use Supplies, Materials And Equipment For Q4 Of Fy 2024 Unit Item Description Quantity Unit Cost Total Cost Lot 1-office Supplies And Other Supplies & Materals Piece Clearbook, 20 Transparent Pockets, A4 18 63.50 1,143.00 Piece Clearbook, 20 Transparent Pockets, Legal 19 99.75 1,895.25 Piece Eraser, Plastic/rubber 5 16.00 80.00 Piece Sign Pen, Extra Fine, Black, 0.3mm 63 30.00 1,890.00 Piece Sign Pen, Fine Tip, Black, 0.4mm 207 30.00 6,210.00 Piece Sign Pen, Medium Tip, Black, 0.5mm 30 30.00 900.00 Piece Gelpen, Black, Pin Tip Size, 0.4mm 54 30.00 1,620.00 Piece Sign Pen, Extra Fine, Blue, 0.3mm 42 30.00 1,260.00 Piece Sign Pen, Fine Tip, Blue, 0.4mm 87 30.00 2,610.00 Piece Sign Pen, Medium Tip, Blue, 0.5mm 79 30.00 2,370.00 Piece Gelpen, Blue, Pin Tip Size, 0.4mm 54 30.00 1,620.00 Piece Pentel Signpen, Blue, 0.07mm 1 99.00 99.00 Piece Gelpen, Green, Pin Tip Size, 0.4mm 30 30.00 900.00 Piece Sign Pen, Extra Fine, Red, 0.3mm 20 30.00 600.00 Piece Sign Pen, Fine Tip, Red, 0.4mm 25 30.00 750.00 Piece Sign Pen, Medium Tip, Red, 0.5mm 23 30.00 690.00 Bottle Ink, For Stamp Pad, 50ml, Black 12 240.00 2,880.00 Piece Glue, 130g 2 75.00 150.00 Box Staple Wire, Heavy Duty (binder Type), 23/13 1 130.00 130.00 Box Staple Wire, Standard #35 12 65.00 780.00 Roll Tape Masking, 24mm 15 62.00 930.00 Roll Tape Masking, 48mm 12 90.00 1,080.00 Roll Tape, Packaging, 48mm 13 80.00 1,040.00 Roll Tape, Transparent, 24mm 25 55.00 1,375.00 Roll Tape, Transparent, 48mm 20 65.00 1,300.00 Piece Pencil Sharpener, Manual, Single Cutter Head 5 250.00 1,250.00 Piece Blade, For General Purpose Cutter/utility Knife, 10's 2 40.00 80.00 Piece Calculator, Compact, 12 Digits, Heavy Duty 1 850.00 850.00 Box Clip, Backfold, 19mm 17 44.50 756.50 Box Clip, Backfold, 25mm 23 55.50 1,276.50 Box Clip, Backfold, 32mm 23 80.00 1,840.00 Box Clip, Backfold, 50mm 22 127.50 2,805.00 Piece Correction Tape, 8 Meters 82 50.00 4,100.00 Piece Cutter/utility Knife., For General Purpose 9 189.00 1,701.00 Piece Data File Box, Made Of Chipboard, With Close End, 3mm Thick,6" 13 225.00 2,925.00 W-125mm, H-230mm, L-400mm, Green-7, Red-6 Pack Marker, Permanent, Black 76 60.00 4,560.00 Piece Data File Folder, Horizontal, Chip Board: 2.55mm Thick, Leatherette 14 225.00 3,150.00 Paper Taglia Lock, W-75mm, L-380mm, H-23mm, Green-8, Red-6 Piece Dating And Stamping Machine 6 574.00 3,444.00 Box Envelope, Mailing, 500 Pieces Per Box 1 808.00 808.00 Box Envelope, Mailing With Window, 500 Pieces Per Box 1 859.90 859.90 Piece Envelope, Expanding Plastic, Long 3 90.00 270.00 Box Fastener, Plastic, Non-sharp Edge, 50 Sets Per Box 9 70.00 630.00 Piece File Organizer, Expanding, Plastic, Legal 6 357.50 2,145.00 Set File Tab/index Divider, Bristol Board, A4 1 46.00 46.00 Set File Tab/index Divider, Bristol Board, Legal 1 56.00 56.00 Box Folder, Pressboard, Long, 100 Pieces Per Box 3 2,000.00 6,000.00 Color: Red-1, Green-2 Pack Folder With Tab, A4, 100 Pieces Per Pack 2 850.00 1,700.00 Pack Folder With Tab, Legal, 100 Pieces Per Pack 1 950.00 950.00 Box Index Tab, Self-adhesive, Transparent, 5 Sets Per Box 25 200.00 5,000.00 Piece Magazine File Box, Large, With Open End, Outside Dimension: Vertical, W-110mm, H-265mm, L-220mm, Material: Chipboard 3mm Thick, Color:red-6, 6 330.00 1,980.00 - Set Marker, Flourescent, Assorted Color, 3 Colors Per Set 9 170.00 1,530.00 Piece Marker, Permanent, Blue 2 60.00 120.00 Piece Marker, Permanent, Red 2 60.00 120.00 Piece Marker, Whiteboard, Black 1 90.00 90.00 Box Paper Clip, Vinyl/plastic Coated, 33mm 4 36.00 144.00 Box Paper Clip, Vinyl/plastic Coated, 50mm 15 54.00 810.00 Box Pencil, Lead/graphite, With Eraser 12 Piece Per Box 15 240.00 3,600.00 Piece Puncher, Paper, Heavy Duty 2 675.00 1,350.00 Box Rubber Band Big 16 355.00 5,680.00 Piece Stamp Pad, Felt, Black 3 57.25 171.75 Pair Scissors, Heavy Duty 7 260.00 1,820.00 Piece Stapler, Standard Type 9 210.00 1,890.00 Piece Stapler Remover, Plier Type 4 142.00 568.00 Pad Note Pad, Stick On, 2"x3", 100 Sheets Per Pad 33 37.00 1,221.00 Pad Note Pad, Stick On, 3"x4", 100 Sheets Per Pad 38 48.00 1,824.00 Pad Note Pad, Stick On, 3"x3", 100 Sheets Per Pad 28 50.00 1,400.00 Piece Notebook Stenographer 3 54.00 162.00 Ream Bond Paper, 70gsm, A4 Size 475 230.00 109,250.00 Ream Bond Paper, 70gsm, Legal Size 145 294.00 42,630.00 Ream Bond Paper, 80gsm Short Size 2 315.00 630.00 Pad Pad Paper, Ruled 2 85.00 170.00 Book Record Book, 300 Pages 2 110.00 220.00 Book Record Book, 500 Pages 2 137.00 274.00 Bottle Ink, Epson T6641 Black 21 355.00 7,455.00 Bottle Ink, Epson T6642 Cyan 11 355.00 3,905.00 Bottle Ink, Epson T6643 Magenta 11 355.00 3,905.00 Bottle Ink, Epson T6644 Yellow 11 355.00 3,905.00 Piece Ballpen, Hbw Ati-1b 0.5 Black 113 25.00 2,825.00 Box Ballpen, Retractable, Black 1 300.00 300.00 Box Ballpen, Retractable, Blue 1 300.00 300.00 Pack Laminating Film (250 Mic), A4 Size 3 900.00 2,700.00 Pack Sticker Paper, A4 18 150.00 2,700.00 Roll Double Sided Tape (12mmx10m) 17 50.00 850.00 Pack Photo Paper, A4 39 64.00 2,496.00 Piece Certificate Frame A4 13 240.00 3,120.00 Piece Certificate Holder A4 130 110.00 14,300.00 Pack Vellum Board Paper, A4, 180gsm 96 75.00 7,200.00 Bottle Ink, Brother D60 Black 48 600.00 28,800.00 Bottle Ink, Brother Bt 5000 Cyan 41 600.00 24,600.00 Bottle Ink, Brother Bt 5000 Magenta 41 600.00 24,600.00 Bottle Ink, Brother Bt 5000 Yellow 41 600.00 24,600.00 Piece Table Pen With Holder, Black Ink 12 70.00 840.00 Piece Photo Frame 20 420.00 8,400.00 Bottle Ink, Epson 003 Black 40 355.00 14,200.00 Bottle Ink, Epson 003 Cyan 38 355.00 13,490.00 Bottle Ink, Epson 003 Magenta 38 355.00 13,490.00 Bottle Ink, Epson 003 Yellow 38 355.00 13,490.00 Bottle Ink Refill For Self Ink Stamp, Purple 10 350.00 3,500.00 Pack Specialty Paper 120gsm, A4, With Fine Wooven Texture Pattern 24 55.00 1,320.00 Pack Board Paper, 200gsm, Pale Cream, 10's 10 75.00 750.00 Piece Gelpen, Super Smooth Gel Ink, Roller Ball, Rubber Grip, 45 120.00 5,400.00 For Comfort &control, Steel Point Provides Strength Water Based, Pigment Gel Ink, 1.0 Ball Point, Blue Piece Gelpen, Super Smooth Gel Ink, Roller Ball, Rubber Grip, For Comfort &control, Steel Point Provides Strength Water Based, Pigment Gel Ink, 1.0 Ball Point, Black 21 120.00 2,520.00 Pack Ear Tabs (sign Here) 6 104.00 624.00 Box Rubber Band No.16 1 65.00 65.00 Pack Specialty Paper, 110gsm, Short 1 55.00 55.00 Pack Specialty Paper, 200gsm, A4 3 70.00 210.00 Piece Unipin Sign Pen, Black, 0.5 18 175.00 3,150.00 Roll Ricoh Master Dx 2430m (riso Machine Drum Roll) 1 4,500.00 4,500.00 Pack Specialty Paper, 200gsm, 10's, Short 1 75.00 75.00 Piece Gelpen 0.5, Black, M&g 5 36.00 180.00 Piece Gelpen 0.5, Green, M&g 30 36.00 1,080.00 Box Fastener, Long 3 75.00 225.00 Pack Stcky Note/post It (pastel Color) 12 45.00 540.00 Roll Yarn (japanesse Cord), Green 10 76.00 760.00 Piece Chip Board, 22"x28" 6 55.00 330.00 Piece Plastic Envelope Long, Green, Red 15 25.00 375.00 Bottle Ink, For Stamp Pad, Blue, 50ml 2 250.00 500.00 Other Supplies & Materials Pack Battery Aa, Pack Of 2 Pieces 83 61.50 5,104.50 Pack Battery Aaa, Pack Of 2 Pieces 99 77.50 7,672.50 Pack Battery Size D, Pack Of 2 Pieces 10 126.00 1,260.00 Can Cleanser, Scouring Powder, 350g 30 62.50 1,875.00 Piece Detergent Bar 25 30.00 750.00 Pouch Detergent Powder, All Purpose, 1kg 87 94.00 8,178.00 Piece Dust Pan, Rigid Non-breakble Plastic 3 112.50 337.50 Can Floor Wax, Paste Type, Red 3 450.00 1,350.00 Can Furniture Cleaner, Aerosol Type, 300ml 10 337.50 3,375.00 Bottle Liquid Hand Soap, 500ml 105 216.50 22,732.50 Piece Rags, All Coton 12 120.00 1,440.00 Pack Scouring Pad 14 275.00 3,850.00 Piece Wastebasket, Rigid Plastic 2 154.00 308.00 Piece Light-emitting Diode (led) Light Bulb, 7 Watts 9 127.00 1,143.00 Piece Light-emitting Diode (led) Linear Tube, 18 Watts 5 286.00 1,430.00 Roll Plastic Twine 25 130.00 3,250.00 Roll Tape Electrical, 0.16mmx19mmx16m 19 80.00 1,520.00 Bottle Glass Cleaner, 500ml 2 231.00 462.00 Bottle Dishwashing Liquid, 500ml 99 131.00 12,969.00 Bottle Bleaching Solution, 450ml 3 190.00 570.00 Piece Door Mat - Non Slip, Gray, 90x120cm, Rubber Bottom 7 987.50 6,912.50 Piece Deodorant Cake, 100g 14 90.00 1,260.00 Bottle Ultra Thick Bleach, 1000ml 75 62.00 4,650.00 Bottle Bombshell Oil Base For Air Humidifier 12 550.00 6,600.00 Piece Water Absrobtion Doormat, Gray, 50x60cm, Rubber Bottom 2 446.75 893.50 Roll Paper Towel, 2 Ply, 140 Pulls 3 190.00 570.00 Piece Folding Cart Trolley Foldable Trolley Hand Pull Trailer With Cover Climb, Foldable, Shopping Troller With Cover Climb, 75l, Heavy Duty 16 961.39 15,382.24 Total – Lot 1 626,155.14 Annex “c” Price Quotation Form _______________________ Date The Bids And Awards Committee Deped, Division Of Quezon Talipan. Pagbilao, Quezon Sir/madam: After Having Carefully Read And Accepted The Terms And Conditions In The Request For Quotation, Hereunder Is Our Quotation/s For The Item/s, As Follows: Unit Item Description Quantity Unit Cost Total Cost Office Supplies Piece Clearbook, 20 Transparent Pockets, A4 18 Piece Clearbook, 20 Transparent Pockets, Legal 19 Piece Eraser, Plastic/rubber 5 Piece Sign Pen, Extra Fine, Black, 0.3mm 63 Piece Sign Pen, Fine Tip, Black, 0.4mm 207 Piece Sign Pen, Medium Tip, Black, 0.5mm 30 Piece Gelpen, Black, Pin Tip Size, 0.4mm 54 Piece Sign Pen, Extra Fine, Blue, 0.3mm 42 Piece Sign Pen, Fine Tip, Blue, 0.4mm 87 Piece Sign Pen, Medium Tip, Blue, 0.5mm 79 Piece Gelpen, Blue, Pin Tip Size, 0.4mm 54 Piece Pentel Signpen, Blue, 0.07mm 1 Piece Gelpen, Green, Pin Tip Size, 0.4mm 30 Piece Sign Pen, Extra Fine, Red, 0.3mm 20 Piece Sign Pen, Fine Tip, Red, 0.4mm 25 Piece Sign Pen, Medium Tip, Red, 0.5mm 23 Bottle Ink, For Stamp Pad, 50ml, Black 12 Piece Glue, 130g 2 Box Staple Wire, Heavy Duty (binder Type), 23/13 1 Box Staple Wire, Standard #35 12 Roll Tape Masking, 24mm 15 Roll Tape Masking, 48mm 12 Roll Tape, Packaging, 48mm 13 Roll Tape, Transparent, 24mm 25 Roll Tape, Transparent, 48mm 20 Piece Pencil Sharpener, Manual, Single Cutter Head 5 Piece Blade, For General Purpose Cutter/utility Knife, 10's 2 Piece Calculator, Compact, 12 Digits, Heavy Duty 1 Box Clip, Backfold, 19mm 17 Box Clip, Backfold, 25mm 23 Box Clip, Backfold, 32mm 23 Box Clip, Backfold, 50mm 22 Piece Correction Tape, 8 Meters 82 Piece Cutter/utility Knife., For General Purpose 9 Piece Data File Box, Made Of Chipboard, With Close End, 3mm Thick,6" 13 W-125mm, H-230mm, L-400mm, Green-7, Red-6 Pack Marker, Permanent, Black 76 Piece Data File Folder, Horizontal, Chip Board: 2.55mm Thick, Leatherette 14 Paper Taglia Lock, W-75mm, L-380mm, H-23mm, Green-8, Red-6 Piece Dating And Stamping Machine 6 Box Envelope, Mailing, 500 Pieces Per Box 1 Box Envelope, Mailing With Window, 500 Pieces Per Box 1 Piece Envelope, Expanding Plastic, Long 3 Box Fastener, Plastic, Non-sharp Edge, 50 Sets Per Box 9 Piece File Organizer, Expanding, Plastic, Legal 6 Set File Tab/index Divider, Bristol Board, A4 1 Set File Tab/index Divider, Bristol Board, Legal 1 Box Folder, Pressboard, Long, 100 Pieces Per Box 3 Color: Red-1, Green-2 Pack Folder With Tab, A4, 100 Pieces Per Pack 2 Pack Folder With Tab, Legal, 100 Pieces Per Pack 1 Box Index Tab, Self-adhesive, Transparent, 5 Sets Per Box 25 Piece Magazine File Box, Large, With Open End, Outside Dimension: Vertical, W-110mm, H-265mm, L-220mm, Material: Chipboard 3mm Thick, Color:red-6, 6 - Set Marker, Flourescent, Assorted Color, 3 Colors Per Set 9 Piece Marker, Permanent, Blue 2 Piece Marker, Permanent, Red 2 Piece Marker, Whiteboard, Black 1 Box Paper Clip, Vinyl/plastic Coated, 33mm 4 Box Paper Clip, Vinyl/plastic Coated, 50mm 15 Box Pencil, Lead/graphite, With Eraser 12 Piece Per Box 15 Piece Puncher, Paper, Heavy Duty 2 Box Rubber Band Big 16 Piece Stamp Pad, Felt, Black 3 Pair Scissors, Heavy Duty 7 Piece Stapler, Standard Type 9 Piece Stapler Remover, Plier Type 4 Pad Note Pad, Stick On, 2"x3", 100 Sheets Per Pad 33 Pad Note Pad, Stick On, 3"x4", 100 Sheets Per Pad 38 Pad Note Pad, Stick On, 3"x3", 100 Sheets Per Pad 28 Piece Notebook Stenographer 3 Ream Bond Paper, 70gsm, A4 Size 475 Ream Bond Paper, 70gsm, Legal Size 145 Ream Bond Paper, 80gsm Short Size 2 Pad Pad Paper, Ruled 2 Book Record Book, 300 Pages 2 Book Record Book, 500 Pages 2 Bottle Ink, Epson T6641 Black 21 Bottle Ink, Epson T6642 Cyan 11 Bottle Ink, Epson T6643 Magenta 11 Bottle Ink, Epson T6644 Yellow 11 Piece Ballpen, Hbw Ati-1b 0.5 Black 113 Box Ballpen, Retractable, Black 1 Box Ballpen, Retractable, Blue 1 Pack Laminating Film (250 Mic), A4 Size 3 Pack Sticker Paper, A4 18 Roll Double Sided Tape (12mmx10m) 17 Pack Photo Paper, A4 39 Piece Certificate Frame A4 13 Piece Certificate Holder A4 130 Pack Vellum Board Paper, A4, 180gsm 96 Bottle Ink, Brother D60 Black 48 Bottle Ink, Brother Bt 5000 Cyan 41 Bottle Ink, Brother Bt 5000 Magenta 41 Bottle Ink, Brother Bt 5000 Yellow 41 Piece Table Pen With Holder, Black Ink 12 Piece Photo Frame 20 Bottle Ink, Epson 003 Black 40 Bottle Ink, Epson 003 Cyan 38 Bottle Ink, Epson 003 Magenta 38 Bottle Ink, Epson 003 Yellow 38 Bottle Ink Refill For Self Ink Stamp, Purple 10 Pack Specialty Paper 120gsm, A4, With Fine Wooven Texture Pattern 24 Pack Board Paper, 200gsm, Pale Cream, 10's 10 Piece Gelpen, Super Smooth Gel Ink, Roller Ball, Rubber Grip, 45 For Comfort &control, Steel Point Provides Strength Water Based, Pigment Gel Ink, 1.0 Ball Point, Blue Piece Gelpen, Super Smooth Gel Ink, Roller Ball, Rubber Grip, For Comfort &control, Steel Point Provides Strength Water Based, Pigment Gel Ink, 1.0 Ball Point, Black 21 Pack Ear Tabs (sign Here) 6 Box Rubber Band No.16 1 Pack Specialty Paper, 110gsm, Short 1 Pack Specialty Paper, 200gsm, A4 3 Piece Unipin Sign Pen, Black, 0.5 18 Roll Ricoh Master Dx 2430m (riso Machine Drum Roll) 1 Pack Specialty Paper, 200gsm, 10's, Short 1 Piece Gelpen 0.5, Black, M&g 5 Piece Gelpen 0.5, Green, M&g 30 Box Fastener, Long 3 Pack Stcky Note/post It (pastel Color) 12 Roll Yarn (japanesse Cord), Green 10 Piece Chip Board, 22"x28" 6 Piece Plastic Envelope Long, Green, Red 15 Bottle Ink, For Stamp Pad, Blue, 50ml 2 Other Supplies & Materials Pack Battery Aa, Pack Of 2 Pieces 83 Pack Battery Aaa, Pack Of 2 Pieces 99 Pack Battery Size D, Pack Of 2 Pieces 10 Can Cleanser, Scouring Powder, 350g 30 Piece Detergent Bar 25 Pouch Detergent Powder, All Purpose, 1kg 87 Piece Dust Pan, Rigid Non-breakble Plastic 3 Can Floor Wax, Paste Type, Red 3 Can Furniture Cleaner, Aerosol Type, 300ml 10 Bottle Liquid Hand Soap, 500ml 105 Piece Rags, All Coton 12 Pack Scouring Pad 14 Piece Wastebasket, Rigid Plastic 2 Piece Light-emitting Diode (led) Light Bulb, 7 Watts 9 Piece Light-emitting Diode (led) Linear Tube, 18 Watts 5 Roll Plastic Twine 25 Roll Tape Electrical, 0.16mmx19mmx16m 19 Bottle Glass Cleaner, 500ml 2 Bottle Dishwashing Liquid, 500ml 99 Bottle Bleaching Solution, 450ml 3 Piece Door Mat - Non Slip, Gray, 90x120cm, Rubber Bottom 7 Piece Deodorant Cake, 100g 14 Bottle Ultra Thick Bleach, 1000ml 75 Bottle Bombshell Oil Base For Air Humidifier 12 Piece Water Absrobtion Doormat, Gray, 50x60cm, Rubber Bottom 2 Roll Paper Towel, 2 Ply, 140 Pulls 3 Piece Folding Cart Trolley Foldable Trolley Hand Pull Trailer With Cover Climb, Foldable, Shopping Troller With Cover Climb, 75l, Heavy Duty 16 Total – Lot 1 Total Amount In Words ____________________________________________________________________________________________________________________________________________________________________________________ _____________________________________ Signature Over Printed Name Of Bidder Annex “d ” Technical Specifications Bidders Must State Here Either “comply” Or Any Equivalent Term In The Column “bidder’s Statement Of Compliance” Against Each Of The Individual Parameters Of Each “specification”. Project Description Item No. Item Description Statement Of Compliance Supply And Delivery Of Common-use Supplies, Materials And Equipment For Q4 Of Fy 2024 Clearbook, 20 Transparent Pockets, A4 Clearbook, 20 Transparent Pockets, Legal Eraser, Plastic/rubber Sign Pen, Extra Fine, Black, 0.3mm Sign Pen, Fine Tip, Black, 0.4mm Sign Pen, Medium Tip, Black, 0.5mm Gelpen, Black, Pin Tip Size, 0.4mm Sign Pen, Extra Fine, Blue, 0.3mm Sign Pen, Fine Tip, Blue, 0.4mm Sign Pen, Medium Tip, Blue, 0.5mm Gelpen, Blue, Pin Tip Size, 0.4mm Pentel Signpen, Blue, 0.07mm Gelpen, Green, Pin Tip Size, 0.4mm Sign Pen, Extra Fine, Red, 0.3mm Sign Pen, Fine Tip, Red, 0.4mm Sign Pen, Medium Tip, Red, 0.5mm Ink, For Stamp Pad, 50ml, Black Glue, 130g Staple Wire, Heavy Duty (binder Type), 23/13 Staple Wire, Standard #35 Tape Masking, 24mm Tape Masking, 48mm Tape, Packaging, 48mm Tape, Transparent, 24mm Tape, Transparent, 48mm Pencil Sharpener, Manual, Single Cutter Head Blade, For General Purpose Cutter/utility Knife, 10's Calculator, Compact, 12 Digits, Heavy Duty Clip, Backfold, 19mm Clip, Backfold, 25mm Clip, Backfold, 32mm Clip, Backfold, 50mm Correction Tape, 8 Meters Cutter/utility Knife., For General Purpose Data File Box, Made Of Chipboard, With Close End, 3mm Thick,6" W-125mm, H-230mm, L-400mm, Green-7, Red-6 Marker, Permanent, Black Data File Folder, Horizontal, Chip Board: 2.55mm Thick, Leatherette Paper Taglia Lock, W-75mm, L-380mm, H-23mm, Green-8, Red-6 Dating And Stamping Machine Envelope, Mailing, 500 Pieces Per Box Envelope, Mailing With Window, 500 Pieces Per Box Envelope, Expanding Plastic, Long Fastener, Plastic, Non-sharp Edge, 50 Sets Per Box File Organizer, Expanding, Plastic, Legal File Tab/index Divider, Bristol Board, A4 File Tab/index Divider, Bristol Board, Legal Folder, Pressboard, Long, 100 Pieces Per Box Color: Red-1, Green-2 Folder With Tab, A4, 100 Pieces Per Pack Folder With Tab, Legal, 100 Pieces Per Pack Index Tab, Self-adhesive, Transparent, 5 Sets Per Box Magazine File Box, Large, With Open End, Outside Dimension: Vertical, W-110mm, H-265mm, L-220mm, Material: Chipboard 3mm Thick, Color:red-6, Marker, Flourescent, Assorted Color, 3 Colors Per Set Marker, Permanent, Blue Marker, Permanent, Red Marker, Whiteboard, Black Paper Clip, Vinyl/plastic Coated, 33mm Paper Clip, Vinyl/plastic Coated, 50mm Pencil, Lead/graphite, With Eraser 12 Piece Per Box Puncher, Paper, Heavy Duty Rubber Band Big Stamp Pad, Felt, Black Scissors, Heavy Duty Stapler, Standard Type Stapler Remover, Plier Type Note Pad, Stick On, 2"x3", 100 Sheets Per Pad Note Pad, Stick On, 3"x4", 100 Sheets Per Pad Note Pad, Stick On, 3"x3", 100 Sheets Per Pad Notebook Stenographer Bond Paper, 70gsm, A4 Size Bond Paper, 70gsm, Legal Size Bond Paper, 80gsm Short Size Pad Paper, Ruled Record Book, 300 Pages Record Book, 500 Pages Ink, Epson T6641 Black Ink, Epson T6642 Cyan Ink, Epson T6643 Magenta Ink, Epson T6644 Yellow Ballpen, Hbw Ati-1b 0.5 Black Ballpen, Retractable, Black Ballpen, Retractable, Blue Laminating Film (250 Mic), A4 Size Sticker Paper, A4 Double Sided Tape (12mmx10m) Photo Paper, A4 Certificate Frame A4 Certificate Holder A4 Vellum Board Paper, A4, 180gsm Ink, Brother D60 Black Ink, Brother Bt 5000 Cyan Ink, Brother Bt 5000 Magenta Ink, Brother Bt 5000 Yellow Table Pen With Holder, Black Ink Photo Frame Ink, Epson 003 Black Ink, Epson 003 Cyan Ink, Epson 003 Magenta Ink, Epson 003 Yellow Ink Refill For Self Ink Stamp, Purple Specialty Paper 120gsm, A4, With Fine Wooven Texture Pattern Board Paper, 200gsm, Pale Cream, 10's Gelpen, Super Smooth Gel Ink, Roller Ball, Rubber Grip, For Comfort &control, Steel Point Provides Strength Water Based, Pigment Gel Ink, 1.0 Ball Point, Blue Gelpen, Super Smooth Gel Ink, Roller Ball, Rubber Grip, For Comfort &control, Steel Point Provides Strength Water Based, Pigment Gel Ink, 1.0 Ball Point, Black Ear Tabs (sign Here) Rubber Band No.16 Specialty Paper, 110gsm, Short Specialty Paper, 200gsm, A4 Unipin Sign Pen, Black, 0.5 Ricoh Master Dx 2430m (riso Machine Drum Roll) Specialty Paper, 200gsm, 10's, Short Gelpen 0.5, Black, M&g Gelpen 0.5, Green, M&g Fastener, Long Stcky Note/post It (pastel Color) Yarn (japanesse Cord), Green Chip Board, 22"x28" Plastic Envelope Long, Green, Red Ink, For Stamp Pad, Blue, 50ml Other Supplies & Materials Battery Aa, Pack Of 2 Pieces Battery Aaa, Pack Of 2 Pieces Battery Size D, Pack Of 2 Pieces Cleanser, Scouring Powder, 350g Detergent Bar Detergent Powder, All Purpose, 1kg Dust Pan, Rigid Non-breakble Plastic Floor Wax, Paste Type, Red Furniture Cleaner, Aerosol Type, 300ml Liquid Hand Soap, 500ml Rags, All Coton Scouring Pad Wastebasket, Rigid Plastic Light-emitting Diode (led) Light Bulb, 7 Watts Light-emitting Diode (led) Linear Tube, 18 Watts Plastic Twine Tape Electrical, 0.16mmx19mmx16m Glass Cleaner, 500ml Dishwashing Liquid, 500ml Bleaching Solution, 450ml Door Mat - Non Slip, Gray, 90x120cm, Rubber Bottom Deodorant Cake, 100g Ultra Thick Bleach, 1000ml Bombshell Oil Base For Air Humidifier Water Absrobtion Doormat, Gray, 50x60cm, Rubber Bottom Paper Towel, 2 Ply, 140 Pulls Folding Cart Trolley Foldable Trolley Hand Pull Trailer With Cover Climb, Foldable, Shopping Troller With Cover Climb, 75l, Heavy Duty I Hereby Certify To Comply With All The Above Technical Specifications. _______________________ _______________________________________ __________________ Name Of Bidder Signature Over Printed Name Of Representative Date Checklist Of Eligibility And Technical Documents For Submission Class “a” Documents 1. Legal Documents • Philgeps Registration • Mayor’s/business Permit • Dti Or Sec Registration • Bir Certificate Of Registration (line Of Business Shall Be Relevant To The Kind Of Goods Or Services To Be Supplied) • Income/business Tax Return (for Abcs Above 500k) 2. Technical Documents • Notarized Omnibus Sworn Statement • Authority Of The Signatory Class “b” Documents • Jva Or The Duly Notarized Statement In Accordance With Section 23.1(b) Of The 2016 Revised Irr, If Applicable Notes: 1. All Documents Must Be Prepared In Two (2) Sets Of Copies, One (1) Original Copy And One (1) Photocopy 2. The Proposal Shall Be Accompanied By The Aforementioned Documents, Otherwise, Non-submission Of Which Shall Result To Disqualification Of Proposal. 3. Documents Must Be Fastened To Avoid Missing Of Pages And Must Be Have Ear Tags For Easy Identification
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Others
United States
Closing Date13 Jan 2025
Tender AmountRefer Documents
Details: This Pre-solicitation Notice Is Not A Request For Proposal. All
information Needed To Submit Sf330 Documents Are Contained
herein. No Additional Solicitation Package Or Technical
information Will Be Issued. project: 544-25-125 Replace Dental Vacuum System work Location: Wm. Jennings Bryan Dorn Va Medical Center, Columbia, Sc 29209 estimated/target Completion Period: 145 Calendar Days After Award. construction Magnitude: Between $100,000 And $250,000. naics: 541330 - Engineering Services small Business Standard: $25.5 Million set-aside: 100% Service-disabled Veteran-owned Small Business (sdvosb) site Visits Will Not Be Arranged During This Phase. the Anticipated Award Date Of The Proposed A-e Contract Is On Or Before September
30, 2025. sf 330 Date Of Receipt/due Date: Interested Firms Having The Capabilities To Perform This Work Must Submit One (1) Electronic Sf 330 And Attachments (if Any) No Later Than
(nlt) 12:00 Pm (est) January 13, 2025. ***attention*** Acknowledgement E-mails Will Be Sent From The Co Upon Receipt Of A Submission. If An Acknowledgement Is Not Returned, The Firm Should Contact The Co At Christopher.jenkins@va.gov And 478-595-2794. project Overview:
the Columbia Va Health Care System Requires A Designed Solution To Repair Or Replace The Dental Vacuum System To Include All Piping, Pumps, Vacuums, Filters, Separators, Valving, Motors, Starters, Controllers, And All Other Necessary Components To Provide A Completely New System. The Current System Is Not Functioning Properly And Believed To Be Caused By The Current Configuration, Component Locations, And Length Of Installed Vacuum Piping. the End Result Of The Contract Is A Complete Set Of Construction Documents To Repair Or Replace The Existing Dental Vacuum System That Are Prepared For Solicitation For Construction. sdvosb Set-aside: this Requirement Is A 100% Set-aside For Service-disabled Veteran-owned Small Businesses Under The Authority Of 38 U.s.c. 8127(d). To Be Eligible For Award The Sdvosb You Must Be Considered Small Under The Relevant Naics Code. Sdvosb Contractors Must Be Verified And Viewable In Sba Vetcert: Https://veterans.certify.sba.gov/ Prior To Submission Of Proposal And Prior To Award Of Contract With Vaar 804.1103-70. Status As A Qualified Sdvosb Concern Is Under The Authority Of 38 Cfr Part 74 In Accordance With The Va Acquisition Regulation (vaar) Part 819. Any Person, Persons, Or Business Entity Suspected Of Misrepresenting Itself For The Purpose Of Securing A Government Contract May Be Criminally Investigated And Prosecuted For Fraud Against The United States Of America. Parties Found Misrepresenting Their Status Also Risk Debarment From Further Government Contracts. Eligibility Determination Is Performed By The Center For Veterans Enterprise (cve). Eligible Sdvosb Concerns Must Also Be Registered At The Following Websites: system For Award Management (sam): Https://www.sam.gov vets-4212 Federal Contractor Reporting Https://www.dol.gov/agencies/vets/programs/vets4212 important Notice: Prior To Submitting A Proposal Under This Sdvosb Set- Aside Solicitation; Offerors Must Apply For And Receive Verification From The Department Of Veteran Affairs Center For Veterans Enterprise (cve) In Accordance With 38 Cfr Part 74 And Vaar 819.70 By Submission Of Documentation Of Veteran Status, Ownership And Control Sufficient To Establish Appropriate Status. All Offerors Are Urged To Contact The Cve And Submit The Aforementioned Required Documents To Obtain Cve Verification Of Their Sdvosb Status If They Have Not Already Done So. for A Service-disabled Veteran Owned Small Business (sdvosb) To Be Considered As A Prospective Contractor, The Firm, Including Joint Ventures, Must Be Verified And Registered In The Department Of Veteran Affairs (va) Office Of Small & Disadvantaged Business Utilization (osdbu) Sba Vetcert: Https://veterans.certify.sba.gov/ And Registered In The System For Award Management (sam) Database (www.sam.gov) At Time Of Submission Of Their Qualifications. Failure Of A Prospective Sdvosb To Be Verified By The Center For Veterans Enterprise (cve) At The Time The Sf 330 Is Submitted Shall Result In Elimination From Consideration. All Joint Ventures Must Be Cve Verified At Time Of Submission And Submit Agreements That Comply With 13cfr 125.15 Prior To
contract Award. in Order To Assure Compliance With Far Clauses, 52.219-14 Limitations On
subcontracting (deviation 2019-01) And Vaar 852.219-10, Va Notice Of Total
service-disabled Veteran-owned Small Business Set-aside (jul 2019)
(deviation), All Firms Submitting A Sf 330 For This Pre-solicitation Notice Are
required To Indicate What Percentage Of The Cost Of Contract Performance Will Be Expended On The Concerns Employees And In Which Discipline(s) And Percentage Of Cost Of Contract Performance To Be Expended (and In What Disciplines) By Any Other Consultant/subcontractor Or Otherwise Used Small Or Large Business Entity(s). Any Consultant/subcontractor Or Otherwise Business Entity(s) Used Must Be Identified By Name, Office Location And Size/type Of Business (i.e. Sdvosb, Vosb, 8(a), Small, Large, Etc.). Failure To Provide This Information Will Deem The Firm S Sf 330 Submittal As Nonresponsive And Preclude Further Evaluation. far Part 36.6 (brooks Act) Selection Procedures Apply. The A-e Services Listed Herein Is Being Procured In Accordance With The Brooks Act (public Law 92-582) As Implemented In Far 36.6 And Vaar 836.6. Pursuant To Far, The Firm Responding To This Requirement Must Be Permitted, By Law, To Practice The Professions Of Architecture Or Engineering And Meet All Required Qualifications For The State Of Georgia. sf330s Shall Be Organized In The Following Order: cover Sheet (one-page Limit)
design Team Background With Locations Of Supporting Offices (one-page Limit)
design Team Organizational Structure With Key Discipline Roles (one-page Limit)
factor 1 Specialized Experience (one Page Per Project Limit) factor 2 - Professional Qualifications (one Page Per Resume Limit)
factor 3 Past Performance Summary Sheet (one-page Limit)
factor 4 - Capacity (one-page Limit)
factor 5 Knowledge Or Location (one-page Limit)
factor 6 Sdvosb Inclusion Statement (one-page Limit)
full Cpars/ppqs Documentation For Factor 1 Projects (20-page Limit) additional Information (10-page Limit) sf330s Received Out Of Sequence Will Be Viewed Negatively. sf330 Specific Requirements:
all Sf330 Pages Shall Be Pdf Searchable For Items 1 Through 11 And Item 13. Full Cpars And Ppqs May Be Scanned. start Each Factor Response On A New Page.
use No Less Than 11-point Font.
all Text And Images Containing Text Is Legible When Printed On 8.5 X 11 Paper. The Evaluation Board Will Not Seek Clarification Regarding Illegible Text. primary Selection Criteria (listed In Descending Order Of Importance): factor 1
specialized Experience (sections F, G And H): Specialized Experience And Technical Competence In The Design And Construction Period Services Will Be Required To Perform Throughout The Life Of The Contract. Projects Experience Pertains To The Types, Size, Recency, Cost, And Complexity Of Work Previously Or Currently Being Performed By The Offeror That Is Comparable To The Work Covered By This Solicitation. page Limit One Page Per Project. Five-page Total For Factor 1. Information Provided On Additional Pages Beyond The One Page Per Project Limit Or Beyond The Five-page Total Limit Will Not Be Included With The Review. relevant Project Experience: Submit Five (3) Projects That Meet All Criteria Shown Below. relevant Project Type Design-bid-build Projects Involving Site Investigation, Schematic Design, Design Development, And Construction Documents. Dental Vacuum System Replacements, Renovations Of Dental Clinics That Include New Dental Vacuum Systems, And New Building Construction That Include New Dental Vacuum Systems Are Acceptable Project Types. Masterplan And Rfp Development For Design-build Contracts Will Not Be Viewed As Relevant. relevant Project Size Systems Service Five Dental Chairs Or More. relevant Project Recency Project Construction Must Be Complete Or Substantially Complete Within The Past Five Years Of The Solicitation Due Date. Substantially Complete Is Defined As 80% Or Greater Of The Construction Project Is Complete At The Time Of The Solicitation Due Date. relevant Project Cost - Construction Project Cost Must Be Greater Than $75,000
relevant Project Complexity The Project Narrative Description Must Indicate Experience With All The Following Criteria:
designing Main Vacuum Systems That Include Amalgam Separators For Dental Service Lines. designing Infection Control Risk Mitigation Plans
designing New Pump/vacuum Drive And Controller System the Relevant Project Criteria Listed Above Is The Minimal Information Required For Acceptable Project Relevance. Additional Value Will Be Considered For Projects Which Convey Expertise With The Following Categories And Will Potentially Increase The Overall Rating For This Factor. Projects That Do Not Convey Additional Value Expertise Will Not Be Considered A Weakness. Additional Value Expertise Includes: experience With The Submitting Firm Serving As The Prime Contractor Leading A Multi-discipline Team Through Investigative, Design, Solicitation, And Construction Period Services. These Services Must Be Documented For Each Project Narrative. designing Hazardous Material Abatement Plans experience With Recent Projects Intended To Support Service Line Dental Service Lines.
va Projects Showing Documented Experience With Implementing Va Design Guides And Standards From The Technical Information Library. experience With Recent Projects Located In The Columbia, Sc, South Carolina Midlands Area, Or Adjacent Counties. experience With Recent Projects That Include Implementing Va Cad And Bim Standards.
submissions Shall Include No More And No Less Than Three (3) Type Projects Of Recent And Relevant Government And Private Experience Projects Similar In Type, Size, Recency, And Complexity, Cost, And Experience With The Type Of Projects/competence Above.
section G Will Used To Evaluate The Prior Experience Of The Prime Firm And Any Key Subcontractors Working Together As A Cohesive Unit On The Provided Relevant Projects. An Acceptable Rating Will Be Given If All Key Disciplines Are Shown, And Each Discipline Participated With At Least One Project Listed On Section G. Proposed Design Team Members That Do Not Have Experience With Any Of The Five Submitted Example Projects As Shown In Section G Will Be Viewed Negatively. factor 2
professional Qualifications (sections C Through E) Necessary For Satisfactory Performance Of Required Service. The Ae Shall Demonstrate They Are Able To Sign And Stamp Each Drawing By Individuals Licensed In Any State In The United States For The Key Positions Listed Below. The Design Firm And A-e Staff Representing The Project Must Be Licensed To Practice In Any State Of The United States Of America. Provide Professional License Numbers And/or Proof Of Licensure. The Evaluation Shall Consider The Specific Experience (minimum Of Five Years) And Qualifications (i.e., Education, Training, Registration, Certifications, Overall Relevant Experience, And Longevity With The Firm As Full-time Employees) Of Personnel Proposed For Assignment To The Project, And Their Record Of Working Together As A Team When Evaluating Professional Qualifications. The Lead Designer In Each Discipline Must Be Registered To Sign Drawings In Each Discipline Must But Does Not Have To Be Registered In The State Where The Project Is Located. The Licensed Professional Must Hold Current Licensure For Said Discipline To Practice In Any State Of The United States Of America. Engineer-in -training (eit) Is Not Considered A Professional Licensure. page Limit One Page Limit Per Position Resume 8 Pages Total For Factor 2. Information Provided On Additional Pages Beyond The 8-page Limit Will Not Be Included With The Review. resume Requirements - A Resume For Each Of These Key Positions Must Be Provided Identifying Their Specific Role, Via Section E In The Sf330. Key Positions And Disciplines Required For This Project Include, But Are Not Limited To, The Lists Of Professionals With Required Licensure And Preferred Licensure Below. An Unacceptable Rating May Be Given If Resumes Are Not Provided For All Roles Listed. positions Requiring Professional Licensure. Not Providing The Professional Licensure Will Be Viewed Negatively And Will Not Be Compliant With The Solicitation. architect mechanical Engineer
electrical Engineer
fire Protection Engineer
plumbing Engineer key Positions With Preferred Qualifications. Design Team Professionals That Have Obtained The Indicated Preferred Licensure May Be Viewed More Favorably. Not Providing The Professional Licensure Will Not Be Viewed Negatively And Will Not Reduce The Overall Rating For This Factor. Higher Value Will Be Given For Professionals With The Preferred Professional Licensure. quality Control Manager - Either Cqm, Cqe, Lean Six Sigma Black Belt, Or Experience With Minimum Five Projects Were Served As Qc Manager.
project Manager - Project Management Professional (pmp) Certification Or More Than 10 Years Experience With Managing A/e Design Projects. construction Cost Estimator - Aspe Certified Professional Estimator (cpe) Certification multi-function Roles Are Allowable For The Following Positions And May Be Shown As Multi-role Positions On The Resumes:
mechanical And Plumbing Engineering. architect, Seps Manager, Bim Manager, Interior Designer
electrical Engineer And Rcdd
project Manager And Quality Control Manager include The Home Office Location For Each Key Discipline Identified On Each Respective Resume In Section E Block 15. the Criteria Listed Above Is The Minimal Information Required For Acceptable Professional Qualifications. Additional Value Will Be Considered For Each Key Position And Will Potentially Increase The Overall Rating For This Factor And Shall Not Exceed The Prescribed Page Limit.
key Personnel Having Greater Than 10 Years Experience In The Practicing Field.
key Personnel With Greater Than Five Years Employment With The Proposed Design Team Firm.
va Design And Construction Experience Within The Past Five Years. any Other Information The Design Team Wishes To Include For This Factor So Long As The Page Limit Is Not Exceeded. factor 3
past Performance (section H): Past Performance Will Be Evaluated On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Of Work, And Compliance With Performance Schedules Along With The Firm S History Of Design Error, Omission, And/or Deficiency Claims. past Performance Will Be Evaluated For All Projects Provided In Section F. The Contractor Performance Assessment Rating System (cpars) Database Will Be Reviewed To Evaluate The Projects That Have A Va Cpars Entry. Va Cpars Are Not Required To Be Submitted With The Sf330 Submission. However, If The Va Cpars Is Not Included With The Sf330 Submission, Then The Contract Number For The Project Must Be Submitted For Each Project Provided In Section F So Cpars Can Be Reviewed In The Database. Please Note We Are Unable To Review Any Cpars From Other Federal Agencies, Outside Of The Va. for Any Project That Does Not Have Va Cpars Data Available, A Past Performance Questionnaire (ppq) Is Required To Be Submitted With The Sf330. If The Firm (prime Or Subcontractor) Was Not The Prime Contractor On Any Project Submit-ted In The Sf330 A Ppq Must Be Provided Listing Their Specific Role As A Subcontractor. The Ppq Should Be Rated And Signed By The Evaluator. In The Event That A Firm Does Not Receive A Requested Complete Ppq From An Evaluator Prior To The Time For Submission, The Firm Shall Submit The Partially Completed Ppq With Section 1 And The Evaluator Information In Section 2 Completed. Ensure A Poc Is Listed With The Project Title/contract Number. The Va Will Make Reasonable Attempts To Contact The Poc Upon Submission For Ppq Completion. the Government May Also Consider Additional Performance Related Information Regarding The Firm, To Include Customer Inquiries, Government Databases, Publicly Available Sources, And Additional Projects In Cpars. The Government Reserves The Right To Contact Any Poc Listed On A Cpars Report Or Ppq. If Appropriate, The Record Of Significant Claims Against The Firm Because Of Improper Or Incomplete Architectural And Engineering Services May Be Evaluated. failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers Will Result In A Firm Being Considered Less Qualified. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. for Ppqs, Please Utilize The Attached Ppq Document. Completed Ppqs Should Be Incorporated Into The Sf 330 Directly. Ppqs Should Not Be Submitted To The Vha Pcac Directly. Any Cpars And Ppqs Will Not Be Counted Towards The Page Limitations For This Submission. However, Any Narratives Provided For Past Performance In Section H Will Be Counted Toward The Page Limit. page Limit Provide No More Than One Page Total For This Factor For The Summary Page. Full Cpars/ppq Documentation Shall Be Included On Additional Pages With The Sf330 And Will Not Count Towards The Total Page Count. provide A Summary Page That Provides The Factor S Required Information. For Each Of The Five Projects, Provide The Following Information. project Information (each Project For Specialized Experience)
past Performance Record Type (ppq Or Cpars)
contract Number
point Of Contact (name, Phone, Email, Job Title, Poc Role)
ae Firm Role With Project (prime Or Subcontractor)
category Ratings provide Complete Cpars (or Ppqs If Cpars Is Not Available) For All Sample Projects After The Sf330 Factor 8 Section. the Criteria Listed Above Is The Minimal Information Required For Acceptable Factor Compliance. Additional Value Will Be Considered For Each Additional Item Below And May Potentially Increase The Overall Rating For This Factor. Locate This Documentation After The Complete Cpars/ppq Documents. Additional Value Documentation Shall Not Exceed Five Pages.
letters Of Appreciation Or Accolades From Previous Projects
industry Recognition Or Design Awards
any Other Information The Design Team Wishes To Include For This Factor So Long As The Five-page Limit Is Not Exceeded. factor 4
capacity (section H): The Evaluation Will Consider The Firm S Ability To Meet The Schedule Of The Overall Project, As Well As The Available Capacity Of Key Disciplines To Perform The Work In The Required Time. Provide The Available Capacity Of Key Disciplines By Providing Current Project Workload, Inclusive Of All Projects Awarded By The Va, Any Federal Agency, And Private Sector During The Previous Twelve (12) Months And The Full Potential Value Of Projects Forecasted Within The Next Twenty-four (24) Months Any Current Indefinite Delivery Contracts That The Firm Has. Include The Full Potential Value Of Any Current Indefinite Delivery Contracts. Offeror Shall Clearly State Their Available Capacity Presenting Workload Percentages For The Key Disciplines And/or Team Members, Including Sub-consultants. Also, The Offeror Must Provide The Completion Percentages And Expected Completion Date For All The Va Projects Current And Forecasted. Awarded In The Previous 12 Months. Please Ensure The Capacity Applies Toward The Team/personnel Provided In The Sf330. The Information For This Factor Shall Be Provided In Section H Of The Sf330. page Limit Provide No More Than Two Pages Total For This Factor. Information Provided On Additional Pages Beyond The One-page Limit Will Not Be Included With The Review. include A Table That Conveys Each Key Discipline, Quantity Of Current Design Project Workload, Quantity Of Current Construction Period Service Workload, Estimated Future Design Load, Estimated Future Construction Workload, Quantity Of Current Idiq Contracts, Total Idiq Contract Capacity, Total Remaining Idiq Capacity, And Percent The Key Discipline Is Available. For Example: key Discipline
total # Of Current Design Project Workload
# Of Current Construction Project Workload
estimated # Of Future Design Project Workload
estimated # Of Future Construction Project Workload
quantity Of Current Idiq Contracts Involved With
total Idiq Capacity All Contracts
(millions)
total Idiq Remaining Capacity
(millions)
percent Available
capacity
architect
6
7
6
7
4
$1m
$2m
45%
mechanical Engineer
4
8
3
8
2
$1m
$1
10%
add Disciplines As Required the Criteria Listed Above Is The Minimal Information Required For Acceptable Factor Compliance. Additional Value Will Be Considered For Each Additional Item Below And May Potentially Increase The Overall Rating For This Factor. Do Not Include Additional Pages In The Additional Information Section.
providing A Narrative Conveying The Design Team S Approach On How New Work Will Merge With The Current Workload. provide A Narrative Describing The Process Regarding Replacement Of Key Disciplines Should One Decide To Leave The Design Team. convey How The Design Team Can Maintain Schedule If A Key Discipline Member Is No Longer Available?
any Other Information The Design Team Wishes To Include For This Factor So Long As The Page Limit Is Not Exceeded. factor 5
knowledge Of Locality (section H). Knowledge Of The Locality, To Include Specific Knowledge Of Certain Local Conditions Or Project Site Features, Such As Geological Features, Climatic Conditions, Working With And Local Construction Methods Or Local Laws And Regulations. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. note That The Intent Of This Factor Is To Showcase A Firm S Understanding Of The Site And Locality, And Not Where The Firm Is Located, How Far Away The Firm/branch Office Is From The Site, And How They Would Travel To The Site. page Limit Page Limit Provide No More Than One Page Total For This Factor. Information Provided On Additional Pages Beyond The One-page Limit Will Not Be Included With The Review. provide An Individual Narrative Conveying Knowledge Of The Locality For Each Of The Following Categories:
local Conditions Or Project Site Features
climatic Conditions
geologic Features
working With And Local Construction Methods
working With Local Laws And Regulations the Criteria Listed Above Is The Minimal Information Required For Acceptable Factor Compliance. Additional Value Will Be Considered For Each Additional Item Below And May Potentially Increase The Overall Rating For This Factor So Long As The Page Limit Is Not Exceeded. Do Not Include Additional Pages In The Additional Information Section. experience With Seismic Designs Applicable To The Columbia, Sc Area. any Other Information The Design Team Wishes To Include For This Factor So Long As The Page Limit Is Not Exceeded. factor 6
use Of Service- Disabled Veteran-owned Small Businesses, Veteran-owned Small Businesses, And Other Types Of Small Businesses As Subcontractors. Offerors Shall Be Evaluated Based On Their Utilization Plans For Service- Disabled Veteran- Owned Small Businesses (sdvosbs), Veteran-owned Small Businesses (vosbs), Or Other Types Of Small Businesses. Offerors Shall Submit Qualifications For Proposed Consultants Per Other Criteria In This Solicitation. page Limit Page Limit Provide No More Than One Page Total For This Factor. Information Provided On Additional Pages Beyond The One-page Limit Will Not Be Included With The Review.
provide A Listing Of All Consulting Firms And Business Government Certification(s). Indicate The Anticipated Percentage Of Work The Consulting Firm Will Perform.
the Criteria Listed Above Is The Minimal Information Required For Acceptable Factor Compliance. The Higher Percentage Of Certified Sdvosb Firms Included With The Design Team May Provide Additional Value And Potentially Increase The Overall Rating For This Factor So Long As The Page Limit Is Not Exceeded. Do Not Include Additional Pages In The Additional Information Section.
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Machinery and Tools
United States
Closing Date3 Jan 2025
Tender AmountRefer Documents
Details: Sources Sought Notice this Is A Sources Sought Notice (ssn) Only. The U.s. Government Is Conducting Market Research Only To Determine The Availability Of Qualified Sources Capable Of Providing Stryker Neptune Full-service Maintenance And Repair Services For Stryker Neptune 3 And Stryker Neptune Docker Devices. Potential Contractors Are Invited To Provide A Response Via E-mail To Contract Specialist At Tracy.heath@va.gov By January 03, 2025, 15:00 (pt). Responses Will Be Used To Determine The Appropriate Strategy For A Potential Acquisition. Please Clearly Identify Any Information Your Company Considers Sensitive Or Proprietary. This Notice Is Issued Solely For Information And Planning Purposes - It Does Not Constitute A Request For Quotation (rfq), Or A Promise To Issue An Rfq In The Future. This Notice Does Not Commit The U.s. Government To Contract For Any Supply Or Service. Further, The U.s. Government Is Not Seeking Quotes, Or Proposals At This Time And Will Not Accept Unsolicited Quotes In Response To This Sources Sought Synopsis. The U.s. Government Will Not Pay For Any Information Or Administrative Costs Incurred In Response To This Notice. Submittals Will Not Be Returned To The Responder. Not Responding To This Notice Does Not Preclude Participation In Any Future Rfq, If Any Is Issued. background: The Contractor Shall Provide All Preventative Maintenance And On-site Repairs. Contractor Shall Ensure That All Units Are Fully Operational According To Manufacturer Specifications Prior To Departure. Contractor Shall Provide All Necessary Travel, Labor, Materials, Tools, Documentation, And Parts Required For The Inspection, Support, And Repair Of The Equipment Listed In The Schedule Of Equipment Below. naics: 811210, Electronic And Precision Equipment Repair And Maintenance interested Potential Contractors Please Provide The Following. 1) Company Name, Address, Point Of Contact, Phone Number, Email Address, And Duns please Indicate Business Size: small Disadvantage Business (sdb)____ 8(a)____
historically Underutilized Business Zone (hubzone)____
service-disabled Veteran-owned Small Business (sdvosb)____
veteran-owned Small Business (vosb)_____
economically Disadvantaged Women-owned Small Business (edwosb)_____
women-owned Small Business Concerns (wosb)_____
small Business_____
large Business_____ please State If You Possess A Federal Supply Schedule (fss)______. 2) Please Submit A Brief Capability Statement (maximum Three Pages) With Enough Information To Demonstrate To The Veterans Affairs That You Have The Enough Resources, Personnel, And Experience To Perform Full Preventative Maintenance And On-site Repairs Per The Manufacturer Specifications As Required In The Attached Draft Statement Of Work. **draft Statement Of Work statement Of Work
1. Contract Title
stryker Neptune Service Contract For The Va Puget Sound Health Care System Seattle Campus
2. Background
the Puget Sound Health Care System, Seattle Campus Requires On-site, Full-service Maintenance And Repair Services To Ensure The Stryker Neptune 3 And Stryker Neptune 2 Docker Devices Are Operating Suitably For Clinical Use.
3. Scope
this Contract Includes All Parts And Services To Properly Provide Preventative Maintenance And On-site Repairs. Contractor Shall Ensure That All Units Are Fully Operational According To Manufacturer Specifications Prior To Departure. Contractor Shall Provide All Necessary Travel, Labor, Materials, Tools, Documentation, And Parts Required For The Inspection, Support, And Repair Of The Equipment Listed In The Schedule Of Equipment (section 4).
4. Specific Tasks
schedule Of Equipment: item #
system Name qty
serial #
1
stryker Neptune 3
11
2421904073
2
stryker Neptune 2 Docker
2
2417328353
3
stryker Neptune S
3
tbd
4
stryker Neptune Sem Docker
1
tbd the Contractor Shall Perform The Following Tasks:
1. Procare Protect Corrective Maintenance stryker Shall Provide The Services For Equipment Set Forth In The Applicable Service Plan, Subject To The Limitations And Exclusions Contained Herein: an Unlimited Number Of Repairs Or Replacements Of The Equipment, Due To Damage Associated With Normal Use, And Wear, Including All Parts And Labor Associated With Mail-in Services
repair Or Replacement Of Equipment At Stryker S Sole Discretion
if Applicable, Loaner Equipment During The Period That Equipment Is In Stryker S Possession For Repair, Except That All Such Loaner Equipment Is Subject To Availability And Stryker S Loaner Policy all Freight Costs Associated With Shipments Of Repairs And Loaner Equipment To The Vapshcs
prioritized Repairs Over Non-contracted Customers, With No Additional Administration Or Approval Process
training To Participant Personnel And Surgeons In The Safe And Effective Use Of The Equipment
other Assistance Reasonably Requested By Participant In Connection With The Equipment
on Each Scheduled On-site Service Call, Stryker Personnel Will Inspect And Adjust Each Available Item Of Equipment As Required In Accordance With Stryker S Then-current Maintenance Procedures For The Equipment
any Maintenance Service Call Scheduled Outside Of Stryker S Normal Working Hours, (monday Through Friday, 7:00 Am To 5:00 Pm Local Time, Excluding Federal Holidays) May Carry An Additional Charge. 2. Procare Prevent Preventative Maintenance
procare Prevent Coverage. Stryker Shall Provide The Procare Protect Coverage For The Equipment Set Forth In The Applicable Service Plan, In Addition To The Services Below, Subject To The Limitations And Exclusions Contained Herein: on-site Preventative Maintenance Inspections And Associated Documentation (i.e., The Joint Commission, Cms Or Dnv Equipment Checklists), For The Equipment
stryker May Perform Preventative Maintenance And Repairs At The Vapshcs Or At The Applicable Stryker Repair Facility In Stryker S Sole Discretion
all Travel Expenses Associated With Scheduled Preventative Maintenance Inspections
each Scheduled On-site Service Call, Stryker Personnel Will Inspect And Adjust Each Available Item Of Equipment As Required In Accordance With Stryker S Then-current Maintenance Procedures For The Equipment (the Preventative Maintenance ). The Contractor Shall Provide The Station Point Of Contact Reports For All Work Performed, As Outlined In The Delivery Schedule
preventative Maintenance Inspections Will Be Scheduled By Vapshcs Or Stryker At A Mutually Agreed Upon Time With The Facility. Equipment Not Made Available At The Mutually Agreed Upon Time Will Be Serviced During The Next Scheduled Service Call Or At Another Specified Date
preventative Maintenance Shall Be Performed By The Contractor At Intervals In Accordance With The Manufacturer S Recommendations, But No Less Than Annually
any Maintenance Service Call Scheduled Outside Of Stryker S Normal Working Hours, (monday Through Friday, 7:00 Am To 5:00 Pm Local Time, Excluding Federal Holidays) May Carry An Additional Charge general Requirements it Shall Be Understood That, Throughout Performance Of The Contract, The Contractor S Personnel, While On Va Property, Shall Adhere To All Requirements And Regulations That Govern The Va Health Care System And Its Property.
among All Other Requirements, The Va Health Care System And Its Property Are Now Entirely Smoke Free.
the Contractor And Their Personnel Shall Follow All U.s. Department Of Veterans Affairs (va) Policies, Standard Operating Procedures, Applicable Laws, And Applicable Regulations While On Va Property. Violations Of This May Result In Citation And Disciplinary Measures For Persons Violating The Law.
contractor And Their Personnel Shall Always Wear Visible Identification While They Are On Premises. possession Of Weapons Is Prohibited.
contractor Shall Take All Reasonable Precautions Necessary To Protect Persons And Property From Injury Or Damage During The Performance Of This Contract.
invoicing Submissions
in Addition To Regulations Set Forth In Far 52.212-4 (contract Terms And Conditions Commercial Items) (g) Invoice And Vaar 852.232-72 (electronic Submission Of Payment Requests), Contractor Shall Submit Final Invoice On Any Services Performed No Later Than 30 Days After End Of The Period Of Performance Of Contract. This Ensures That Closeout Of Contracts Follows Far 4.804-1(b).
6. Performance Monitoring
the Contractor Shall Be Monitored By The Station Point Of Contact Or Their Designee. The Station Point Of Contact Shall Submit An Annual Performance Evaluation To Network Contracting Office 20 Summarizing The Performance Viewed Over The Period Of Performance. 8. Other Pertinent Information Or Special Considerations
all Contractor Personnel Must Have At Least Two Years Of Field Experience As A Field Service Engineer Or Meet Oem Standards For A Fully Qualified Field Service Engineer To Perform Maintenance On The Equipment. No Subcontracting Is Authorized For This Contract. contractor Must Provide, Upon Request, Documentation Of Factory Certified Service/maintenance Training On The Specific Equipment Under The Terms Of This Contract. All Parts Used Shall Be Oem Parts Only. Reverse Engineered And/or Refurbished Parts Shall Not Be Utilized Under The Terms Of This Contract Without Explicit Permission, In Writing, From The Contracting Officer (co) After Co Consultation With Va Technical Representative (vatr). Subcontracting Of Any Ensuing Award Of This Solicitation Will Not Be Allowed Without Written Permission Of The Co. contractor Will Provide The Necessary Manpower And Supervision To Properly Execute The Preventative And Corrective Maintenance Of The Equipment Specified On Equipment List . the Station Point Of Contact Shall Conduct Routine Inspections, Product Sampling, And Monitoring Of Work While Contractor Is On Site. In The Event Of Any Concerns, The Station Point Of Contact Shall Notify Network Contracting Office 20 And Coordinate Addressing The Concerns. equipment May Be Added Or Deleted From The Service Contract As Needed Upon Modification By The Contracting Officer (co). Deleted Equipment Shall Be Credited In The Full Amount If Deleted Before Any Scheduled Maintenance Has Been Performed On It.
7. Risk Control
vendor Must Coordinate With Station Point Of Contact For Access To The Seattle Campus. Once Vendor Completes The Service, They Must Check Out With Station Point Of Contact To Ensure That All Work Has Been Completed With No Issues. If Any Issues Arise The Station Point Of Contact Must Be Contacted.
8. Place Of Performance department Of Veterans Affairs
puget Sound Health Care System
seattle Division
1660 S. Columbian Way
seattle, Wa 98108-1597
9. Period Of Performance. this Will Be A Single Award Firm Fixed Price Contract With One (1) Base Year And Up To Four (4) Option Years For This Contract: Base: 03/01/2025 02/28/2026
option Year 1: 03/01/2026 02/28/2027
option Year 2: 03/01/2027 02/29/2028
option Year 3: 03/01/2028 02/28/2029
option Year 4: 03/01/2029 02/28/2030 10. Delivery Schedule
deliverable Title
format
calendar Days After Co Start
full-service Report (fsr) For (3) Neptune S Rover 2pm Prevent Procare +sem
contractor-determined Format; Comprehensive Service Report And Corrective And Preventative Maintenance Checklist
within 24 Hours Of Service Completion, Email To Onsite Staff As Well As The Station Point Of Contact
full-service Report (fsr) For (11) Neptune 3 Rover 2pm Prevent Procare +sem
contractor-determined Format; Comprehensive Service Report And Corrective And Preventative Maintenance Checklist
within 24 Hours Of Service Completion, Email To Onsite Staff As Well As The Station Point Of Contact
full-service Report (fsr) For (3) Neptune 2 Docker 2pm Prevent Procare
contractor-determined Format; Comprehensive Service Report And Corrective And Preventative Maintenance Checklist
within 24 Hours Of Service Completion, Email To Onsite Staff As Well As The Station Point Of Contact
monthly Report
shows All The Work Accomplished Each Moth And All Work Planned To Be Accomplished In The Following Month. Identifies Unresolved Problems And Their Proposed Solution, As Well As Resolved Problems And The Steps Taken To Resolve Them.
due The Last Day Of Each Month 11. Security Requirements
the Contractor Employees Shall Not Have Access To Va Sensitive Or Computer Information And Will Not Require Routine Access To Va Facilities. The Contractor Employees Shall Require Intermittent Access Only And Will Be Escorted By Va Employees While At Va Facilities. No Background Investigation Is Required.
access To Va Information And Info Systems
the Contractor Or Subcontractor Must Notify The Contracting Officer Immediately When An Employee Working On A Va System Or With Access To Va Information Is Reassigned Or Leaves The Contractor Or Subcontractor S Employ. The Contracting Officer Must Also Be Notified Immediately By The Contractor Or Subcontractor Prior To An Unfriendly Termination.
contract Personnel Who Require Access To National Security Programs Must Have A Valid Security Clearance. National Industrial Security Program (nisp) Was Established By Executive Order 12829 To Ensure That Cleared U.s. Defense Industry Contract Personnel Safeguard The Classified Information In Their Possession While Performing Work On Contracts, Programs, Bids, Or Research And Development Efforts. The Department Of Veterans Affairs Does Not Have A Memorandum Of Agreement With Defense Security Service (dss). Verification Of A Security Clearance Must Be Processed Through The Special Security Officer Located In The Planning And National Security Service Within The Office Of Operations, Security, And Preparedness.
custom Software Development And Outsourced Operations Must Be In The U.s. To The Maximum Extent Practical. If Such Services Are Proposed To Be Performed Abroad And Are Not Disallowed By Other Va Policy Or Mandates, The Contractor/subcontractor Must State Where All Non-u.s. Services Are Provided And Detail A Security Plan, Deemed To Be Acceptable By Va, Specifically To Address Mitigation Of The Resulting Problems Of Communication, Control, Data Protection, And So Forth. Location Within The U.s. May Be An Evaluation Factor.
va Information Custodial Language
for Service That Involves The Storage, Generating, Transmitting, Or Exchanging Of Va Sensitive Information But Does Not Require C&a Or An Mou-isa For System Interconnection, The Contractor/subcontractor Must Complete A Contractor Security Control Assessment (csca) On A Yearly Basis And Provide It To The Cotr.
the Contractor/subcontractor Must Store, Transport, Or Transmit Va Sensitive Information In An Encrypted Form, Using Va-approved Encryption Tools That Are, At A Minimum, Fips 140-2 Validated.
the Contractor/subcontractor S Firewall And Web Services Security Controls, If Applicable, Shall Meet Or Exceed Va S Minimum Requirements. Va Configuration Guidelines Are Available Upon Request.
except For Uses And Disclosures Of Va Information Authorized By This Contract For Performance Of The Contract, The Contractor/subcontractor May Use And Disclose Va Information Only In Two Other Situations: (i) In Response To A Qualifying Order Of A Court Of Competent Jurisdiction, Or (ii) With Va S Prior Written Approval. The Contractor/subcontractor Must Refer All Requests For, Demands For Production Of, Or Inquiries About, Va Information And Information Systems To The Va Contracting Officer For Response.
notwithstanding The Provision Above, The Contractor/subcontractor Shall Not Release Va Records Protected By Title 38 U.s.c. 5705, Confidentiality Of Medical Quality Assurance Records And/or Title 38 U.s.c. 7332, Confidentiality Of Certain Health Records Pertaining To Drug Addiction, Sickle Cell Anemia, Alcoholism Or Alcohol Abuse, Or Infection With Human Immunodeficiency Virus. If The Contractor/subcontractor Is In Receipt Of A Court Order Or Other Requests For The Above-mentioned Information, That Contractor/subcontractor Shall Immediately Refer Such Court Orders Or Other Requests To The Va Contracting Officer For Response.
security Incident Investigation
the Term Security Incident Means An Event That Has, Or Could Have, Resulted In Unauthorized Access To, Loss Or Damage To Va Assets, Or Sensitive Information, Or An Action That Breaches Va Security Procedures. The Contractor/subcontractor Shall Immediately Notify The Cotr And Simultaneously, The Designated Iso And Privacy Officer For The Contract Of Any Known Or Suspected Security/privacy Incidents, Or Any Unauthorized Disclosure Of Sensitive Information, Including That Contained In System(s) To Which The Contractor/subcontractor Has Access.
to The Extent Known By The Contractor/subcontractor, The Contractor/subcontractor S Notice To Va Shall Identify The Information Involved, The Circumstances Surrounding The Incident (including To Whom, How, When, And Where The Va Information Or Assets Were Placed At Risk Or Compromised), And Any Other Information That The Contractor/subcontractor Considers Relevant.
with Respect To Unsecured Protected Health Information, The Business Associate Is Deemed To Have Discovered A Data Breach When The Business Associate Knew Or Should Have Known Of A Breach Of Such Information. Upon Discovery, The Business Associate Must Notify The Covered Entity Of The Breach. Notifications Need To Be Made In Accordance With The Executed Business Associate Agreement.
in Instances Of Theft Or Break-in Or Other Criminal Activity, The Contractor/subcontractor Must Concurrently Report The Incident To The Appropriate Law Enforcement Entity (or Entities) Of Jurisdiction, Including The Va Oig And Security And Law Enforcement. The Contractor, Its Employees, And Its Subcontractors And Their Employees Shall Cooperate With Va And Any Law Enforcement Authority Responsible For The Investigation And Prosecution Of Any Possible Criminal Law Violation(s) Associated With Any Incident. The Contractor/subcontractor Shall Cooperate With Va In Any Civil Litigation To Recover Va Information, Obtain Monetary Or Other Compensation From A Third Party For Damages Arising From Any Incident, Or Obtain Injunctive Relief Against Any Third Party Arising From, Or Related To, The Incident.
liquidated Damages For Data Breach
consistent With The Requirements Of 38 U.s.c. §5725, A Contract May Require Access To Sensitive Personal Information. If So, The Contractor Is Liable To Va For Liquidated Damages In The Event Of A Data Breach Or Privacy Incident Involving Any Spi The Contractor/subcontractor Processes Or Maintains Under This Contract.
the Contractor/subcontractor Shall Provide Notice To Va Of A Security Incident As Set Forth In The Security Incident Investigation Section Above. Upon Such Notification, Va Must Secure From A Non-department Entity Or The Va Office Of Inspector General An Independent Risk Analysis Of The Data Breach To Determine The Level Of Risk Associated With The Data Breach For The Potential Misuse Of Any Sensitive Personal Information Involved In The Data Breach. The Term 'data Breach' Means The Loss, Theft, Or Other Unauthorized Access, Or Any Access Other Than That Incidental To The Scope Of Employment, To Data Containing Sensitive Personal Information, In Electronic Or Printed Form, That Results In The Potential Compromise Of The Confidentiality Or Integrity Of The Data. Contractor Shall Fully Cooperate With The Entity Performing The Risk Analysis. Failure To Cooperate May Be Deemed A Material Breach And Grounds For Contract Termination.
each Risk Analysis Shall Address All Relevant Information Concerning The Data Breach, Including The Following:
(1) Nature Of The Event (loss, Theft, Unauthorized Access);
(2) Description Of The Event, Including:
(a) Date Of Occurrence;
(b) Data Elements Involved, Including Any Pii, Such As Full Name, Social Security Number, Date Of Birth, Home Address, Account Number, Disability Code;
(3) Number Of Individuals Affected Or Potentially Affected;
(4) Names Of Individuals Or Groups Affected Or Potentially Affected;
(5) Ease Of Logical Data Access To The Lost, Stolen Or Improperly Accessed Data In Light Of The Degree Of Protection For The Data, E.g., Unencrypted, Plain Text;
(6) Amount Of Time The Data Has Been Out Of Va Control;
(7) The Likelihood That The Sensitive Personal Information Will Or Has Been Compromised (made Accessible To And Usable By Unauthorized Persons);
(8) Known Misuses Of Data Containing Sensitive Personal Information, If Any;
(9) Assessment Of The Potential Harm To The Affected Individuals;
(10) Data Breach Analysis As Outlined In 6500.2 Handbook, Management Of Security And Privacy Incidents, As Appropriate; And
(11) Whether Credit Protection Services May Assist Record Subjects In Avoiding Or Mitigating The Results Of Identity Theft Based On The Sensitive Personal Information That May Have Been Compromised.
based On The Determinations Of The Independent Risk Analysis, The Contractor Shall Be Responsible For Paying To The Va Liquidated Damages In The Amount Of $37.50 Per Affected Individual To Cover The Cost Of Providing Credit Protection Services To Affected Individuals Consisting Of The Following:
(1) Notification;
(2) One Year Of Credit Monitoring Services Consisting Of Automatic Daily Monitoring Of At Least
3 Relevant Credit Bureau Reports;
(3) Data Breach Analysis;
(4) Fraud Resolution Services, Including Writing Dispute Letters, Initiating Fraud Alerts And Credit Freezes, To Assist Affected Individuals To Bring Matters To Resolution;
(5) One Year Of Identity Theft Insurance With $20,000.00 Coverage At $0 Deductible; And
(6) Necessary Legal Expenses The Subjects May Incur To Repair Falsified Or Damaged Credit Records, Histories, Or Financial Affairs.
security Controls on A Periodic Basis, Va, Including The Office Of Inspector General, Reserves The Right To Evaluate Any Or All Of The Security Controls And Privacy Practices Implemented By The Contractor Under The Clauses Contained Within The Contract. With 10 Working-days Notice, At The Request Of The Government, The Contractor Must Fully Cooperate And Assist In A Government-sponsored Security Controls Assessment At Each Location Wherein Va Information Is Processed Or Stored, Or Information Systems Are Developed, Operated, Maintained, Or Used On Behalf Of Va, Including Those Initiated By The Office Of Inspector General. The Government May Conduct A Security Control Assessment On Shorter Notice (to Include Unannounced Assessments) As Determined By Va In The Event Of A Security Incident Or At Any Other Time.â¬
training
all Contractor Employees And Subcontractor Employees Requiring Access To Va Information And Va Information Systems Shall Complete The Following Before Being Granted Access To Va Information And Its Systems:
(1) Sign And Acknowledge (either Manually Or Electronically) Understanding Of And Responsibilities For Compliance With The Contractor Rules Of Behavior, Appendix E Relating To Access To Va Information And Information Systems;
(2) Successfully Complete The Va Cyber Security Awareness And Rules Of Behavior Training And Annually Complete Required Security Training;
(3) Successfully Complete The Appropriate Va Privacy Training And Annually Complete Required Privacy Training; And
(4) Successfully Complete Any Additional Cyber Security Or Privacy Training, As Required For Va Personnel With Equivalent Information System Access [to Be Defined By The Va Program Official And Provided To The Contracting Officer For Inclusion In The Solicitation Document E.g., Any Role-based Information Security Training Required In Accordance With Nist Special Publication 800-16, Information Technology Security Training Requirements.]
a. The Contractor Shall Provide To The Contracting Officer And/or The Cotr A Copy Of The Training Certificates And Certification Of Signing The Contractor Rules Of Behavior For Each Applicable Employee Within 1 Week Of The Initiation Of The Contract And Annually Thereafter, As Required.
b. Failure To Complete The Mandatory Annual Training And Sign The Rules Of Behavior Annually, Within The Timeframe Required, Is Grounds For Suspension Or Termination Of All Physical Or Electronic Access Privileges And Removal From Work On The Contract Until Such Time As The Training And Documents Are Complete.
12. Government-furnished Equipment (gfe)/government-furnished Information (gfi) no Gfe Or Gfi Shall Be Provided To The Contractor For The Performance Of This Contract. information Made Available To The Contractor Or Subcontractor By Va For The Performance Or Administration Of This Contract Or Information Developed By The Contractor/subcontractor In Performance Or Administration Of The Contract Shall Be Used Only For Those Purposes And Shall Not Be Used In Any Other Way Without The Prior Written Agreement Of The Va. This Clause Expressly Limits The Contractor/subcontractor's Rights To Use Data As Described In Rights In Data - General, Far 52.227-14(d) (1). va Information Should Not Be Co-mingled, If Possible, With Any Other Data On The Contractors/subcontractor S Information Systems Or Media Storage Systems In Order To Ensure Va Requirements Related To Data Protection And Media Sanitization Can Be Met. If Co-mingling Must Be Allowed To Meet The Requirements Of The Business Need, The Contractor Must Ensure That Va S Information Is Returned To The Va Or Destroyed In Accordance With Va S Sanitization Requirements. Va Reserves The Right To Conduct On-site Inspections Of Contractor And Subcontractor It Resources To Ensure Data Security Controls, Separation Of Data And Job Duties, And Destruction/media Sanitization Procedures Are In Compliance With Va Directive Requirements. Prior To Termination Or Completion Of This Contract, Contractor/subcontractor Must Not Destroy Information Received From Va, Or Gathered/created By The Contractor In The Course Of Performing This Contract Without Prior Written Approval By The Va. any Data Destruction Done On Behalf Of Va By A Contractor/subcontractor Must Be Done In Accordance With National Archives And Records Administration (nara) Requirements As Outlined In Va Directive 6300, Records And Information Management And Its Handbook 6300.1 Records Management Procedures, Applicable Va Records Control Schedules, And Va Handbook 6500.1, Electronic Media Sanitization. Self-certification By The Contractor That The Data Destruction Requirements Above Have Been Met Must Be Sent To The Va Contracting Officer Within 30 Days Of Termination Of The Contract. the Contractor/subcontractor Must Receive, Gather, Store, Back Up, Maintain, Use, Disclose And Dispose Of Va Information Only In Compliance With The Terms Of The Contract And Applicable Federal And Va Information Confidentiality And Security Laws, Regulations, And Policies. If Federal Or Va Information Confidentiality And Security Laws, Regulations And Policies Become Applicable To The Va Information Or Information Systems After Execution Of The Contract, Or If Nist Issues Or Updates Applicable Fips Or Special Publications (sp) After Execution Of This Contract, The Parties Agree To Negotiate In Good Faith To Implement The Information Confidentiality And Security Laws, Regulations, And Policies In This Contract. the Contractor/subcontractor Shall Not Make Copies Of Va Information Except As Authorized And Necessary To Perform The Terms Of The Agreement Or To Preserve Electronic Information Stored On Contractor/subcontractor Electronic Storage Media For Restoration In Case Any Electronic Equipment Or Data Used By The Contractor/subcontractor Needs To Be Restored To An Operating State. If Copies Are Made For Restoration Purposes, After The Restoration Is Complete, The Copies Must Be Appropriately Destroyed. if Va Determines That The Contractor Has Violated Any Of The Information Confidentiality, Privacy, And Security Provisions Of The Contract, It Shall Be Sufficient Grounds For Va To Withhold Payment To The Contractor Or Third Party Or Terminate The Contract For Default Or Terminate For Cause Under Federal Acquisition Regulation (far) Part 12.
3241-3250 of 3258 archived Tenders