Printing Tenders

Printing Tenders

Adela Serra Ty Memorial Medical Center Tender

Laboratory Equipment and Services
Philippines
Details: Description Invitation To Bid For The Procurement Of Microbiology Reagents (tie-up Basis) And Supplies With Ib No. 2025-02-04 (08) 1. The Adela Serra Ty Memorial Medical Center, Using A Single Year Framework Agreement, Through The Astmmc Fund Intends To Apply The Sum Twenty Five Million Two Hundred Nineteen Thousand Two Hundred Pesos Only [php 25,219,200.00], Being The Abc To Payments Under The Contract For Each Item. Bids Received In Excess Of The Abc Shall Be Automatically Rejected. 2. The Adela Serra Ty Memorial Medical Center Now Invites Bids For The Procurement Of Microbiology Reagents (tie-up Basis) And Supplies. Delivery Of The Goods Is Required Within 15 Calendar Days After Issuance Of A Call-off. Bidders Should Have Completed, Within 5 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non- Discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Adela Serra Ty Memorial Medical Center And Inspect The Bidding Documents At The Address Given Below During 8:00am To 5:00pm, Monday Thru Friday. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 15, 2025 To February 4, 2025 From The Given Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents In The Amount Of Twenty Five Thousand Pesos Only [php 25,000.00]. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment In Person. 6. The Adela Serra Ty Memorial Medical Center Will Hold A Pre-bid Conference On January 23, 2025; 10:30 Am At Bac Conference Room, Opd Bldg, Astmmc, Tandag City And Or Through Video Conferencing Or Webcasting Via Meet.google.com/rbu-snjw-vga Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before 10:30 Am; February 4, 2025. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On 10:31 Am; February 4, 2025 At Bac Conference Room, Opd Bldg, Astmmc, Tandag City And Or Through Video Conferencing Or Webcasting Via Meet.google.com/rbu-snjw-vga Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Adela Serra Ty Memorial Medical Center Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Bac Office, 2nd Floor Opd Bldg. Astmmc, Tandag City, Sds, 8300 Tel No. 086-211-4306 Astmmcprocurement@gmail.com 12. For Downloading Of Bidding Documents, You May Visit: Philgeps.gov.ph January 15, 2025 Date Issued Dominador B. Toral, Rn, Md, Dpbohns Hbac Chairman Lot / Item Number Description Quantity Unit Unit Cost Total Delivered, Weeks/ Months Lot 1 Winning Bidder Responsibilities: > Must Provide For Free An Iso-certified Fully Automated Blood Culture Machine That Utilizes Comprehensive Detection Technology. > Free Of Charge Technical Services Of Company Engineer Which Must Be Available And Responsive To Any Of The Problems Or Concerns Of The Machine 24/7, Conduct Regular Monthly Machine's Calibration And Preventive Maintenance. >supplier Must Have A Warehouse Or Functional Service Center With Company Employed Qualified Technical Service Engineers. >supplier Must Possess A Certificate Of Exclusive Distributorship ( Ced ) For The Security Of The Laboratory's Uninterrupted Operation > Should Have Atleast 2 Current Installations To Tertiary Laboratories Anywhere In The Philippines With The Same Offered Machine. > Machine Should Be Delivered Complete With A Heavy Duty Accessories (ups 6 Kva, Avr, Keyboard, Printer, Table And Any Other Needed Accessories, Safety Breaker Etc.) > Capable Of A Prompt Replacement Of Defective Parts In Case Of Breakdown (not Later Than 48 Hours From Bug Down) >supplier Must Possess A Certificate Of Exclusive Distributorship (ced) For The Security Of The Laboratory's Uninterrupted Operation. > Suppliers Must Provide A Free Phlebotomy Training And Blood Culture Collection Training >provide 10 Or More Dedicated Phlebotomy Warding Trays And Tourniquets For Blood Culture Collection Alone. > Quantity Of Reagents Must Be Delivered Based On Nefa Or Notice To Execute Of Framework Agreement Or Staggered Scheme Or Upon The Request Of The End-user. > Payments Will Be Issued Per Delivery Of Reagents. > Reagents Delivered Must Be 18 Months From The Expiration Date, A Guarantee Letter Of Replacement May Be Issued For Less Than 18 Months Reagents And Supplies. > A Framework Agreement For A 1-year Contract Shall Be Made. >reagent Or Supplies With Shelf Life Of Less Than 5 Months Must Submit A Certificate Of Option To Return (otr),if Not Consumed Within The Expiry Date And It Must Be Replaced. Machine Specifications: > Has Colorimetric Technology And Specialized Liquid Emulsion Sensors (les) At The Bottom Of Each Culture Bottle > Offers A Comprehensive Range Of Media Bottles To Ensure The Recovery Of A Wide Variety Of Microorganisms Including Bacteria, Mycobacteria, And Fungi > Can Provide Graph Analysis > Blood Culture Bottles Must Be Plastic And Color Coded For Pediatric And Adult Patients > Bottles With Direct Draw > With Agitation Technology > With Built-in Quality Control > With Immediate Bottle Recognition > With Rapid Response Time And Greater Accuracy. Faster Time To Detection (minimum Of 2 Hours) > At Least 60 Cells Or More Of Capacity Per Drawer > Could Fit Shatter-proof Plastic Culture Bottles > Supplier Must Provide 2 Lis Ready Analyzer. The Other One Serves As Back-up Machine That Is Also Ready To Use And Lis Connection. > Supplier Must Shoulder The Two (2) Analyzer's Lis Connectivity Fee/charges With The Existing Astmmc Lis Provider. Please Refer Below For The Lis Connectivity Corresponding Charges To Be Paid Directly To Adela Serra Ty Memorial Medical Center Account. Lis Connectivity Charges/fees Contract Amount 16m To 20m 11m To 15m 6m To 10m 1m To 5m Below 1m 1st Fully Automated Analyzer 288,000.00 270,000.00 252,000.00 234,000.00 216,000.00 2nd And Succeeding Analyzer 160,000.00 150,000.00 140,000.00 130,000.00 120,000.00 Contract Amount 16m To 20m 11m To 15m 6m To 10m 1m To 5m Below 1m 1st Semi-automated Analyzer 192,000.00 180,000.00 168,000.00 156,000.00 144,000.00 2nd And Succeeding Analyzer 112,000.00 105,000.00 98,000.00 91,000.00 84,000.00 Contract Amount 16m To 20m 11m To 15m 6m To 10m 1m To 5m Below 1m 1st Poct Analyzer 128,000.00 120,000.00 112,000.00 104,000.00 96,000.00 2nd And Succeeding Analyzer 80,000.00 75,000.00 70,000.00 65,000.00 60,000.00 Pedia Culture Bottles For Automated Isolation Of Aerobic Microorganisms In Sterile Samples 50's/box With Pre-attached Closeblood Collection System. 80 Boxes 25,000.00 2,000,000.00 15 Calendar Days After Issuance Of A Call-off Adult Culture Bottles For Automated Isolation Of Aerobic Microorganisms In Sterile Samples 50's/box With Pre-attached Closeblood Collection System. 120 Boxes 25,000.00 3,000,000.00 15 Calendar Days After Issuance Of A Call-off Subtotal 5,000,000.00 Lot 2 Winning Bidder Responsibilities: > Must Provide For Free An Iso-certified Fully Automated Machine For The Identification And Susceptibility Of All Bacteria And Yeast > Free Of Charge Technical Services Of Company Engineer Which Must Be Available And Responsive To Any Of The Problems Or Concerns Of The Machine 24/7, Conduct Regular Monthly Machine's Calibration And Preventive Maintenance. >supplier Must Have A Warehouse Or Functional Service Center With Company Employed Qualified Technical Service Engineers. >supplier Must Possess A Certificate Of Exclusive Distributorship ( Ced ) For The Security Of The Laboratory's Uninterrupted Operation > Should Have At Least 2 Current Installations To Tertiary Laboratories Anywhere In The Philippines With The Same Offered Machine. > Machine Should Be Delivered Complete With A Heavy Duty Accessories (ups 6 Kva, Avr, Keyboard, Printer, Table And Any Other Needed Accessories Etc.) >preferably With Remote Connectivity For Updates And Fast Troubleshooting > Supplier Must Provide Two Machine. The One Will Serve As Back-up Machine That Is Also Ready To Use And Lis Connected. > Capable Of A Prompt Replacement Of Defective Parts In Case Of Breakdown (not Later Than 48 Hours From Bug Down) > Two Machine Provided Must Be Ready And Connected To Lis The Main And Back-up Machine > Supplier Must Shoulder Connectivity Fee/charges For Lis Services For Two Machine And Coordinate With Astmmc Lis Provider For The Lis Connection. >supplier Must Provide 2 Lis Ready Analyzer. >the Other One Serves As Back-up Machine That Is Also Ready To Use And Lis Connection. > Supplier Must Shoulder The Two (2) Analyzer's Lis Connectivity Fee/charges With The Existing Astmmc Lis Provider. > Please Refer Below For The Lis Connectivity Corresponding Charges To Be Paid Directly To Adela Serra Ty Memorial Medical Center Account. Lis Connectivity Charges/fees Contract Amount 16m To 20m 11m To 15m 6m To 10m 1m To 5m Below 1m 1st Fully Automated Analyzer 288,000.00 270,000.00 252,000.00 234,000.00 216,000.00 2nd And Succeeding Analyzer 160,000.00 150,000.00 140,000.00 130,000.00 120,000.00 Contract Amount 16m To 20m 11m To 15m 6m To 10m 1m To 5m Below 1m 1st Semi-automated Analyzer 192,000.00 180,000.00 168,000.00 156,000.00 144,000.00 2nd And Succeeding Analyzer 112,000.00 105,000.00 98,000.00 91,000.00 84,000.00 Contract Amount 16m To 20m 11m To 15m 6m To 10m 1m To 5m Below 1m 1st Poct Analyzer 128,000.00 120,000.00 112,000.00 104,000.00 96,000.00 2nd And Succeeding Analyzer 80,000.00 75,000.00 70,000.00 65,000.00 60,000.00 > Supplier Must Have Technical Engineer Readily Available Within The Region. >supplier Must Have A Regular Personnel With A Certificate Of Training Capable In Troubleshooting The Machine They Intent To Bid. >supplier Must Posses A Certificate Of Exclusive Distributorship (ced) For The Security Of The Laboratory's Uninterrupted Operation. >supplier Must Provide A Free Of Charge Consumables Like Reagents Of Machine Needed To Operate And To Generate Result,portable Digital Turbidimeter To Ensure Correct Macfarland Standard,calibrators,calibrated Pipettes,other Consumables For Ast Suspencion And Complete Atcc Control Strains: Pae 27853, Eco 25922, Eco 35218, Sau 25923, Spn 49619, Hin 29427, Ngo 49226). > Quantity Of Reagents Must Be Delivered Based On Nefa Or Notice To Execute Framework Agreement Or Staggered Scheme Or Upon The Request Of The End-user. > Payments Will Be Issued Per Delivery Of Reagents. >reagent Or Supplies With Shelf Life Of Less Than 5 Months Must Submit A Certificate Of Option To Return (otr),if Not Consumed Within The Expiry Date And It Must Be Replaced. > Reagents Delivered Must Be 18 Months From The Expiration Date, A Guarantee Letter Of Replacement May Be Issued For Less Than 18 Months Reagents And Supplies. > A Framework Agreement For A 1-year Contract Shall Be Made. Machine Specifications: > Automated Bacterial Identification And Susceptibility Testing System That Uses Fluorescence-based Technology.with Gold-standard Accuracy For Microorganism Identification And Susceptibility > Delivers Accurate Emerging Resistance Detection For The Toughes Pathogens, Including Visa, Vrsa, Mrsa,icr And Rapid Detection Of Esbl Production And Confirmation. > Processes Rapid And Specialty Id Panels For Reduced Turnaround Time.could Generate Results As Little As 5 To 8 Hours > Utilizes Closed Tests Card And Cassettes For Id And Ast > Allows Consolidation Of Data From Multiple Testing Systems On Epidemiology Reports > Lis-who Net Configuration And Connection Ready.has Remote Support Feature In Instrument Monitoring And Lis Connectivity >with Built-in Barcode Scanner And Scan Card And Isolate Barcodes To Establish Traceability > Has Rapid Result Searches By Patient, Date Tested, Organism, Technician And Accession Number > Allow Remote Access By Multiple Users And Real-time Connectivity To Our Existing Lis > Updated Clsi Guidelines Compliant Ast Interpretation/formulations Available Producing Mic's Based On Reference Clsi And Iso Mic Methods Gram Positive Id & Ast Panel 20's 150 Boxes 30,000.00 4,500,000.00 15 Calendar Days After Issuance Of A Call-off Gram Positive (streptococcus Spp) Ast 20's 20 Boxes 30,000.00 600,000.00 15 Calendar Days After Issuance Of A Call-off Gram Negative Id And Ast Panel 20s 200 Boxes 30,000.00 6,000,000.00 15 Calendar Days After Issuance Of A Call-off Rapid Yeast Id & Afst Panel 20s 30 Boxes 30,000.00 900,000.00 15 Calendar Days After Issuance Of A Call-off Gram Negative Id 20's 20 Boxes 30,000.00 600,000.00 15 Calendar Days After Issuance Of A Call-off Gram Positive Id 20's 20 Boxes 30,000.00 600,000.00 15 Calendar Days After Issuance Of A Call-off Haemophilus And Neisseria Id And Ast Panel 20s 20 Boxes 30,000.00 600,000.00 15 Calendar Days After Issuance Of A Call-off Subtotal 13,800,000.00 Lot 3 Ciprofloxacin Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Trimethoprim-sulfamethoxazole Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Piperacillin-tazobactam Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Amikacin Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Ampicillin Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Ampicillin-sulbactam Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Azithromycin Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Amoxicillin-clavulinic Acid Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Ceftriaxone Discs (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Cefotaxime Disc(50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Clindamycin Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Cefuroxime Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Ciprofloxacin Disc(50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Erythromycin Disc(50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Levofloxacin Disc(50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Nitrofurantoin Disc(50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Oxacillin Disc(50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Aztreonam Disc(50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Ceftazidime Disc(50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Cefazolin Disc(50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Cefipime Disc(50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Cotton Roll 10 Cart 1500.00 15,000.00 15 Calendar Days After Issuance Of A Call-off Gentamicin High (hlar) Disc (50's) 120ug 10 Cart 2200.00 11,000.00 15 Calendar Days After Issuance Of A Call-off Gentamicin Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Imipenem Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Ertapenem (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Meropenenm Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Nitrofurantoin Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Cefiderocol (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Penicillin G Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Tetracycline Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Tobramycin Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Vancomycin Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Cefoxitin Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Chloramphenicol Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Cefixime Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Rifampin Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Linezolid Disc (50's) 10 Cart 800.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Taxo P (optochin) 50's 5 Cart 3,000.00 15,000.00 15 Calendar Days After Issuance Of A Call-off Taxo A (bacitracin) 50's 5 Cart 3,000.00 15,000.00 15 Calendar Days After Issuance Of A Call-off V Factor Disc (50's) 5 Cart 5,000.00 25,000.00 15 Calendar Days After Issuance Of A Call-off X Factor Disc (50's) 5 Cart 5,000.00 25,000.00 15 Calendar Days After Issuance Of A Call-off Xv Factor Disk (50"s) 1 Cart 5,000.00 5,000.00 15 Calendar Days After Issuance Of A Call-off Oxidase Disc/strip (50's) 10 Cart 5,000.00 50,000.00 15 Calendar Days After Issuance Of A Call-off Subtotal 449,000.00 Lot 4 Sheep Blood Agar (commercially Prepared) 10s 5,000 Plates 220.00 1,100,000.00 15 Calendar Days After Issuance Of A Call-off Chocolate Agar (commercially Prepared) 10's 3,000 Plates 250.00 750,000.00 15 Calendar Days After Issuance Of A Call-off Alkaline Peptone Water Agar (500g) 2 Bottle 7.000.00 14,000.00 15 Calendar Days After Issuance Of A Call-off Salmonella Shigela Agar (500g) 2 Bottle 13,600.00 27,200.00 15 Calendar Days After Issuance Of A Call-off Selenite F (500g) 2 Bottle 15,000.00 30,000.00 15 Calendar Days After Issuance Of A Call-off Tcbs (500g) 2 Bottle 10,000.00 20,000.00 15 Calendar Days After Issuance Of A Call-off Mueller Hinton Agar (500g) 10 Bottle 10,000.00 100,000.00 15 Calendar Days After Issuance Of A Call-off Mac Conkey Agar Powder (500g) 15 Bottle 9,500.00 142,500.00 15 Calendar Days After Issuance Of A Call-off Nutrient Agar Powder (500g) 5 Bottle 8,000.00 40,000.00 15 Calendar Days After Issuance Of A Call-off Sabouraud Dextrose Agar (500g) 5 Bottle 8,000.00 40,000.00 15 Calendar Days After Issuance Of A Call-off Fluid Thioglycolate Medium Powder (500g) 5 Bottle 8,000.00 40,000.00 15 Calendar Days After Issuance Of A Call-off Tsb Powder (500g) 5 Bottle 8,000.00 40,000.00 15 Calendar Days After Issuance Of A Call-off Gc Agar (500g) 5 Bottle 8,000.00 40,000.00 15 Calendar Days After Issuance Of A Call-off Gba Commercially Prepared (10's) 1,000 Plates 300.00 300,000.00 15 Calendar Days After Issuance Of A Call-off Bacitracin Chocoolate Agar Commercially Prepared (10's) 1,000 Plates 300.00 300,000.00 15 Calendar Days After Issuance Of A Call-off Tsi Powder (500g) 5 Bottle 8,000.00 40,000.00 15 Calendar Days After Issuance Of A Call-off Lysine Iron Agar (500g) 5 Bottle 8,000.00 40,000.00 15 Calendar Days After Issuance Of A Call-off Simmon Citrate Agar Powder (500g) 5 Bottle 8,000.00 40,000.00 15 Calendar Days After Issuance Of A Call-off Urea (christensen) Agar Base (500g) 5 Bottle 8,000.00 40,000.00 15 Calendar Days After Issuance Of A Call-off Catalase Reagent 60ml (3% Hydrgen Peroxide) 5 Bottle 15, 000.00 75,000.00 15 Calendar Days After Issuance Of A Call-off Sim Medium (500g) 5 Bottle 8,000.00 40,000.00 15 Calendar Days After Issuance Of A Call-off Lim Medium (500g) 5 Bottle 8,000.00 40,000.00 15 Calendar Days After Issuance Of A Call-off Sodium Chloride Agar (500g) 5 Bottle 8,000.00 40,000.00 15 Calendar Days After Issuance Of A Call-off Bile Esculin Agar (500g) 4 Bottle 8,000.00 32,000.00 15 Calendar Days After Issuance Of A Call-off Dnase Agar (500g) 1 Bottle 8,000.00 8,000.00 15 Calendar Days After Issuance Of A Call-off Iso Vitalex Supplement (10's) 10 Boxes 10,000.00 100,000.00 15 Calendar Days After Issuance Of A Call-off Vcnt Supplement (10"s) 2 Boxes 10,000.00 20,000.00 15 Calendar Days After Issuance Of A Call-off Coagulase Rabbit Plasma (10's) 20 Boxes 22,000.00 440,000.00 15 Calendar Days After Issuance Of A Call-off Soluble Hemoglobin Powder (400g) 5 Bottle 15,000.00 75,000.00 15 Calendar Days After Issuance Of A Call-off Subtotal 4,013,700.00 1 0.9 % Sterile Normal Saline Solution 1l 100 Bottle 200.00 20,000.00 15 Calendar Days After Issuance Of A Call-off 2 Gram Stain Set 15 Set 4,000.00 60,000.00 15 Calendar Days After Issuance Of A Call-off 3 Kovac's Reagent (100ml) 3 Bottle 11,000.00 33,000.00 15 Calendar Days After Issuance Of A Call-off 4 10% Koh Solution (500ml) 3 Bottle 8,000.00 24,000.00 15 Calendar Days After Issuance Of A Call-off 5 India Ink (100 Ml) 1 Bottle 10,000.00 10,000.00 15 Calendar Days After Issuance Of A Call-off 6 Disposable Sterile Loop 10ul+1ul Calibration(100's) 100 Boxes 7,000.00 700,000.00 15 Calendar Days After Issuance Of A Call-off 7 Wire Loop 5 Pc 300.00 1,500.00 15 Calendar Days After Issuance Of A Call-off 8 Wire Needle 5 Pc 300.00 1,500.00 15 Calendar Days After Issuance Of A Call-off 9 Sterile Cotton Swab (100's) 200 Boxes 800.00 160,000.00 15 Calendar Days After Issuance Of A Call-off 10 Iodine Cotton Swab (25's) 100 Boxes 1000.00 100,000.00 15 Calendar Days After Issuance Of A Call-off 11 Povidone Iodine Bottle (500ml) 10 Bottle 600.00 6,000.00 15 Calendar Days After Issuance Of A Call-off 12 Sterile Bottle Container Individually Pack 50 Ml 10,000 Pc 15.00 150,000.00 15 Calendar Days After Issuance Of A Call-off 13 Petri Dish (big) 2,000 Pc 40.00 80,000.00 15 Calendar Days After Issuance Of A Call-off 14 Petri Dish (small Single Plate) 1,000 Pc 10.00 10,000.00 15 Calendar Days After Issuance Of A Call-off 15 Glass Tubes (100's) 13x75mm (autoclavable) 10 Boxes 1000.00 10,000.00 15 Calendar Days After Issuance Of A Call-off 16 Petri Dish(small Biplate) 2,000 Pc 30.00 60,000.00 15 Calendar Days After Issuance Of A Call-off 17 Sterile Transfer Pipettes (100s) 40 Pack 1,500.00 60,000.00 15 Calendar Days After Issuance Of A Call-off 18 Beaker 500ml (autoclavable) 5 Pc 1000.00 5,000.00 15 Calendar Days After Issuance Of A Call-off 19 Beaker 1000ml (autoclavable) 5 Pc 1500.00 7,500.00 15 Calendar Days After Issuance Of A Call-off 20 Erlenmeyer Flask With Cap 500 Ml (autoclavable) 5 Pc 3500.00 17,500.00 15 Calendar Days After Issuance Of A Call-off 21 Erlenmeyer Flask With Cap 1000ml (autoclavable) 5 Pc 5000.00 25,000.00 15 Calendar Days After Issuance Of A Call-off 22 Glass Stirrer 10 Pc 200.00 2,000.00 15 Calendar Days After Issuance Of A Call-off 23 Autoclave Bags (200's) 5 Set 4000.00 20,000.00 15 Calendar Days After Issuance Of A Call-off 24 Aluminum Foil (30x150) 5 Pc 500.00 2,500.00 15 Calendar Days After Issuance Of A Call-off 25 Autoclave Tape 10 Pc 500.00 5,000.00 15 Calendar Days After Issuance Of A Call-off 26 Denatured Alcohol (1l) 5 Bottle 3000.00 15,000.00 15 Calendar Days After Issuance Of A Call-off 27 Autoclavable Culture Tube With Screw Cap 13x100mm 1,000 Pc 100.00 100,000.00 15 Calendar Days After Issuance Of A Call-off 28 Big Test Tube Rack (autoclavable) 2 Pc 3000.00 6,000.00 15 Calendar Days After Issuance Of A Call-off 29 Small Test Rack (autoclavable) 5 Pc 3000.00 15,000.00 15 Calendar Days After Issuance Of A Call-off 30 0.75 Inch Needle Length G23 Needle Size, 7-inch Tubing Butterfly Set With Safety Needle Shield And Attached Luer Adapter, For Close-blood Collection System.(50's) 50 Boxes 5,000.00 250,000.00 15 Calendar Days After Issuance Of A Call-off Total Amount 1,956,500.00 Total Amount 25,2019,200.00 Purpose For Laboratory Use
Closing Date4 Feb 2025
Tender AmountPHP 25.2 Million (USD 430.6 K)

DEPT OF THE NAVY USA Tender

Aerospace and Defence
Corrigendum : Closing Date Modified
United States
Description: Item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| time Of Delivery (june 1997)|20||||||||||||||||||||| stop-work Order (aug 1989)|1|| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)||tbd|n00383|tbd|tbd|tbd|tbd||||||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| value Engineering (jun 2020)|3|||| equal Opportunity (sep 2016)|2||| integrity Of Unit Prices (nov 2021)|1|| equal Opportuity For Workers With Disabilities (jun 2020)|2||| transportation Of Supplies By Sea (jan 2023)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| limitation Of Liability--high-value Items (feb 1997)|1|| limitations On Pass-through Charges (jun 2020)|1|| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|336413|1250||||||||||| facsimile Proposals (oct 1997)|1|| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x| the Purpose Of This Amendment Is To Incorporate The Following Change: 1. The Quantity Is Increased By Qty 5 To Qty 7. \ this Solicitation Will Be Using Competitive Procedures. This Requirement Will Be Limited To Government Government Approved Sources. Submission Of An Offer Indicates Acceptance Of, And Compliance With, The Requirement To Be An Approved Source For This Item. the Basis Of Award Will Be Trade-off. Offers Will Be Evaluated Based On The Non-price Factors Of Capacity, Delivery, And Past Performance, And When Combined, Those Non-price Factors Being More Important Than Price. Proposal Submission Should Include Non-price factors And Price Information. Price Will Still Be A Factor In Determining The Awardee. relevant Past Performance Demonstrates The Offeror's Past Performance Manufacturing (or Repair) An Item Of The Same Or Similar Scope, Complexity And Magnitude Relative To The Instant Requirement. The Submission Of Past Performance Should Be Limited To Three relevant Contracts. the Closing Date For This Solicitation Is Listed On Page 1. the Proposal May Be E-mailed To The Below Address And Must Be Received On Or Before 2:00 Pm Est Of The Closing Date. offers Received After The Closing Date Are Considered To Be Late And Will Not Be Considered For Award. all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, or Sent By Other Electronic Commerce Methods, Such As E-mail. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To Issue Contractual Documents As Detailed Herein. \ 1. Scope 1.1 . Markings Shall Be In Accordance With Mil-std-130. 1.2 Pre-award / Post Award Requirements: due To The Critical Use Of This Item And Its Quality History, A Pre-award Survey And Post-award Conference May Be Required For All New Manufacturers. For All Previous Sources, A Post-award Conference May Be Recommended. 1.3 . The Contractor Shall Include On The Detailed Process/operation Sheets Developed, (1) All In House Manufacturing Processes And (2) The Identity Of All Manufacturing Sources Performing Processes/operations Outside Their Facility. These Sheets Shall Not Be revised Or Altered After The Successful Completion Of First Article Or Production Lot Testing Without Approval From The Basic Design Engineering Activity, Via The Pco. 1.4 . Unless Otherwise Specified, For Fabricated Parts, The Inspection method Sheets/ Final Inspection Sheets Shall List The Characteristics of Each Item Produced Under The Contract. the Manufacturer Shall Be Required To Provide Certifications Of All Raw material Including Castings And Forgings. The Material Source Shall Be identified And The Documentation Shall Be Able To Identify The Customer and/or Contract Number. The Manufacturer Shall Maintain All Raw Material documentation For A Minimum Of Ten (10) Years. the Contractor Is Responsible For Providing Completed Inspection Method Sheets/final Inspection Sheets Showing The Actual Dimensions Taken For all Characteristics,in Addition, Critical Characteristics Shall Be annotated. 1.5 The Components Being Acquired Under This Solicitation Have Been Classified As Flight Critical Requiring Engineering Source Approval By The Naval Air Systems Command. Only Those Companies Who Have Submitted Requests For Source Approval And Been Approved will Be Eligible For Award Under This Solicitation. Any Company Not Previously Approved May Submit A Source Approval Request To The Contracting Officer, Naval Inventory Control Point, (see Block 10 Of The sf33 For Name And Code). The Source Approval Request Shall Contain The Following Documentation And Shall Be Submitted By The Closing Date Of This Solicitation: (a) Copy Of Complete Configuration Drawings For A Similar Item(s) Which Your Company Has Produced Within The Past Three Years, Including Test Procedures For Which Your Company (1) Has Been Qualified To Manufacture And (2) Which Is Similar, I.e., Requires The same Materials, Manufacturing Processes, Inspections, Tolerances And Similar Application As The Item(s) For Which You Are Seeking Approval. (b) Copy Of The Complete Process/operation Sheets Used To Manufacuture The Similar Item, Including But Not Limited To, Detailed Shop Sketches. These Plans Must Note Those Operations And Processes Performed By Subcontractors/ Vendors. (c) Complete Copies Of Purchase Orders, Shipping Documents, Etc. That Document Delivery Of Production Quantities Of The Part To The Original Equipment Manufacturer Or Military Service. Provide The Most Recent Copies Of The Documents. (d) A Detailed Comparative Analysis Of The Differences/similarities Between The Similar Part And The Part(s) For Which You Are Seeking Approval. This Analysis Should Include Materials, Configuration, Tolerances, Process Requirements, Dimensions, Castings, forgings, Etc. (e) Copy Of Inspection Method Sheets Used In The Manufacturing And At Final Inspection. These Sheets Should Include Actual Tolerance, Print Requirements, Inspection Devices, Sources Performing The Operation And Level Of Inspection. Critical Characteristics should Be Discernible From All Other Characteristics. the Above Requirements Are A Subset Of Requirements Specified In The Aso source Approval Information Brochure Dated January 1995. The Submission Of This Data Subset Is Contingent Upon And In Consideration Of The Submitting Contractor Meeting All Other Requirements Specified In This Solicitation To Include A Bilateral Agreement With mda Which Includes Availability Of Complete Data, Mrb Disposition, Etc. Any Company Not Having Such Agreement, But Desiring To Seek Engineering Source Approval, Will Be Required To Submit Data Meeting All Requirements Of The Aso/navicp Source Approval brochure. the Contractor Shall Notify Navicp Code 072 When Material Required By This Contract Has Been Shipped To Destination.this Shall Be Accomplished By Sending a Copy Of The Dd Form 250, Material Inspection And Receiving Report To: naval Inventory Control Point attn: Code 072 700 Robbins Avenue, Phila., Pa 19111 or By Submitting A Facsimile To Fax: (215)697-2524, Attn: Code 072. 1.6 Sampling Rates (aqls) Indicated Below Shall Be Used In Accordance With ansi Z1.4 For Single Sampling And A General Inspection Level Of Ii. 1.7 In Addition To The 100% Pco Mandatory, Critical And Major Characteristics, attributes For Plating, Hardness And Non-destructive Testing Will Be Inspected one Hundred Percent. 1.8 Contractor Shall Develop A System For Identification Of Individual piece Parts For Traceability Purposes. Markings Shall Not Be Permanent. 1.9 An Aql Of 1.5 Will Be Used For Class 3 Threads And Dimensions, And geometric Feature Controls With A Tolerance Range Of .010 Or Less. 1.10 For Minor Characteristics, A Sampling Rate Determined By The Contractor and Subject To Qar Approval Will Be Used. 1.11 The Material Covered In This Contract/purchase Order Will Be Used In A crucial Shipboard System Enabling The Launch And/or Recovery Of Aircraft. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In A Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems Or Loss Of Aircraft. Therefore,the Material Has Been designated As Critical Material And Special Control Procedures Are Invoked to Ensure Receipt Of Correct Material. 1.12 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;nawc Lakehurst; Drawing Number ( ;34000d1532801; ) ;rev "c" ; , Revision ;applies; And All Details And Specifications Referenced Therein. 1.13 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not be Provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced specification. 1.14 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c. 2. Applicable Documents drawing Data=mpr 1222 |80020| A| |d| | | | drawing Data=mpr 1223 |80020| C| |d| | | | 3. Requirements 1.unique Requirements: a.all Records Pertaining To Alre Csi/cai Manufacture And Inspection/test Shall Be Provided To The Alre Cognizant Technical Authority. All Records Shall Be Maintained By Lke Qa And By The Manufacturer For A Period Of Seven Years. 2. Interim Inspection Requirements: The Following Item(s) Requires An Interim Inspection At The Contractor's Location: a. P/n 34000d1532801, Aft Bogey Assembly (csi): i. Witness Of Torque Per Notes 2, 3, 4, And 5 Of Drawing 34000d1532801 (m101-m104). b. P/n 34000d1532802, Aft Bogey (csi): i. Verification Of Material Properties Per Note 3 Of Drawing 34000d1532802 (c101). ii. Witness Of Hardness Testing Per Note 3 Of Drawing 34000d1532802(c101). iii. Witness Of Ultrasonic Testing Per Note 3 Of Drawing 34000d1532802iv. Witness Of Penetrant Inspection Per Note 5 Of Drawing 34000d1532802 (m101). v. Witness Of Torque Per Note 8 Of Drawing 34000d1532802 (m102). vi. Witness Of Dimensional Inspection Per Drawing 34000d1532802 (c102-c106, M103-m105). c. P/n 34000d1532803; Wheel Assy, Horizontal, Aft (csi): i. Witness Of Torque Per Notes 4 And 5 Of Drawing 34000d1532803 (m101, M102). d. P/n 34000d1532804; Bracket, Horiz, Wheel, Aft (csi):i. Verification Of Material Properties Per Note 4 Of Drawing 34000d1532804 (c101). ii. Witness Of Hardness Testing Per Note 4 Of Drawing 34000d1532804 (c101). iii. Witness Of Ultrasonic Testing Per Note 4 Of Drawing 34000d1532804(c101)/ Iv. Witness Of Penetrant Inspection Per Note 9 Of Drawing 34000d1532804(m101). v. Witness Of Dimensional Inspection Per Drawing 34000d1532804 (c102). the Contractor Shall Assist On The Conduct Of The Interim Inspection(s) As Described Herein. The Contractor Shall Provide Adequate Facilities, Inspection Equipment, And Skilled Personnel, To Support The Nawcadlkenspector In The Conduct Of The Interim inspection(s). The Contractor Shall Provide Gauges, Tools, Fixtures, And Jigs Necessary To Perform The Inspections.the Contractor Shall Also Provide Sufficient Rigging/material Handling Services And Manpower To Setup/configure/operate Equipment& Machines Used to Accomplish The Inspection Task. This Contractorssist Requirement Shall Be Applicable To 100% Of The Production Quantitiesand As A Minimum, Include Inspection Of All (100%) Interim Inspectionrequirements Identified Above. 3. Alre Csi Parts Require Certification. When Certified, An Alre Part Is Marked With A Material Identification Code(mic). Nawcadlke Qa Will Provide The Mic To Dcma If The Component Is Source Accepted, And After Receipt Of All Aassociated Data. Application Of mic Shall Be In The Same Methodology As The Drawing Note For Part Marking, And In Same Area As Partmarking (next To, Above, Or Below). 4. Receipt Inspection And Certification Of Sub-components: a. P/ns 34000d1532802, 34000d1532803, And 34000d1532804 Shall Be Certified At The Time Of Interim Inspection. Parts Will Be Certified And Markedas Directed By Nawcadlke Prior To Assembly. Contractor Assist Andmarking As Specified Below Applies. 5. Receipt Inspection And Certification Of The Top Assembly: a. The Receipt Inspection And Certification Of The Top Assembly Shall Occur During The Final Inspection. Contractor Assist And Part Marking As Specified Below Applies. 6. Contractor Assist And Part Marking: a. The Contractor Shall Assist On The Conduct Of The Inspections (both Final And Interim) Required That Are Necessary To Certify The Critical Items 6. Contractor Assist And Part Marking: a. The Contractor Shall Assist On The Conduct Of The Inspections (both Finalnd Interim) Required That Are Necessary To Certify The Critical Items Specified Herein. The Contractor Shall Provide Adequate Facilities, Inspectionequipment, And Skilled Personnel, To support The Nawcadlke Inspectorin The Conduct Of The Interim Inspection(s). The Contractor Shall Provide Gauges, Tools, Fixtures, And Jigs Necessary To Perform The Inspections. The Contractor Shall Also Provide Sufficient Rigging/material Handlingservices And manpower To Setup/configure/operate Equipment & Machines Used To Accomplish The Inspection Task. This Contractor Assist Requirement Shall Be Applicable To 100% Of The Production Quantities. As Part Of The Mri Process, The Nawcadlke Qa Representative Will provide, In Writing, A Certification Number Along With Direction For Marking Thecritical Safety Items (csi). 4. Quality Assurance 4.1 Review Documentation As Provided Under Dd 1423 Requirements. 4.2 Critical Manufacturing Processes ( ;n/a; ) Heat Treat ( ;applies; ) Welding ( ;n/a; ) Cadmium Plating ( ;n/a; ) Engineering Chrome Plating ( ;n/a; ) Nickel Chrome Plating ( ;n/a; ) Casting(s) ( ;n/a; ) Forging(s) ( ;mpr 1222, Mpr 1223; ) Mpr (material Processing Requirements) 4.3 The Test To Be Performed Under The First Article Approval Clause (far 52.209-3) Of The Contract Are Listed Below 4.3.1 Dimensional Test (special) ;close Machine Tolerances, Hardness Test; 4.3.2 Requirements Of: ;lke Drawing Package; 4.3.3 Form ;applies; 4.3.4 Fit ;n/a; 4.3.5 Function ;n/a; 4.3.6 Compliance With Drawing ( ;80020; ) ;34000d1532801; , Revision ;c; And Specifications Referenced Therein. 4.4 In Addition To The Above Tests, The First Article(s) To Be Inspected Hereunder Shall Also Be Subjected To Those Tests Which Will Demonstrate That The Article(s) Comply With The Contract Requirements 4.5 The Contractor Shall Be Responsible For Providing The Necessary Parts And Repair Of The First Article Sample(s) During Inspection 4.6 The Contractor Shall Notify The Pco, Aco, And Qar Fourteen (14) Days Prior To Conducting The First Article Test So That The Government May Witness Such Testing. 4.6.1 The Qar Shall Be Present To Witness All First Article Testing. 4.6.2 The Following Additional Personnel Shall Witness The First Article Testing: ;lonnie White Nawc Qa Rep At Fax (732) 323-4986; 4.7 Disposition Of Fat Samples 4.7.1 ; ; Sample(s) May Be Destroyed During Testing. 4.7.2 ;applies; Unless Otherwise Provided For In The Contract, Sample(s) Shall Remain At The Contractor And May Be Considered As Production Items Under The Contract Provided The Sample(s) Can Be Refurbished To Ready For Issue Condition And Provided The sample(s) Have Inspection Approval Of The Cognizant Dcmc Qar. Sample(s) May Be Shipped As Production Items Only After All Other Units Required Under The Contract Have Been Produced And Are Ready For Shipment. 4.8 Test Sample Coating Instructions 4.8.1 Samples Are To Be Unpainted. Corrosive Areas Are To Be Coated With A Light Preservative If Required. 4.9 Notice To Government Of Testing At The Contractors Facility. 4.9.1 Far 52.209-3 Applies (a) The Contractor Shall Present ;one; ; Unit(s) Of The Following Cage( ;80020; ; ), Part Number ;34000d1532801; ; , Revision ;c; ; As Specified In This Contract. At Least Fourteen (14) Calendar Days Before The Beginning Of The First Article Testing, The contractor Shall Notify The Contracting Officer, In Writing, Of The Time And Location Of The Testing So That The Government May Witness The Tests. (b) The Contractor Shall Submit The First Article Test Report Within 15 Calendar Days From The Date Of Testing To: ;pco; ; the Contractor Shall Mark The Report "first Article Test Report" And Cite The Contract Number And Lot/item Number. Review Documentation As Provided Under The Dd1423 Requirements. (c) Within 45 Calendar Days After The Government Inspects The First Article, The Contracting Officer Shall Notify The Contractor, In Writing, Of The Approval, Conditional Approval, Or Disapproval Of The First Article. The Notice Of Approval, Conditional approval, Or Disapproval Shall Not Relieve The Contractor From Complying With All Requirements Of The Specifications And All Other Terms And Conditions Of This Contract. A Notice Of Conditional Approval Shall State Any Further Action Required Of The contractor. A Notice Of Disapproval Shall Cite Reasons For Disapproval. (d) If The First Article Is Disapproved, The Contractor, Upon Government Request Shall Repeat Any Or All First Article Tests. After Each Request For Additional Tests, The Contractor Shall Make Any Necessary Changes, Modifications, Or Repairs To The First article Or Select Another First Article For Testing. All Costs Related To These Tests Are To Be Borne By The Contractor, Including Any And All Costs For Additional Tests Following A Disapproval. The Contractor Shall Then Conduct The Tests And Deliver Another report To The Government Under The Terms And Conditions And Within The Time Specified In Paragraph B Above. The Government Reserves The Right To Require An Equitable Adjustment Of The Contract Price For Any Extension Of The Delivery Schedule Or For Any additional Costs To The Government Related To These Tests. (e) If The Contractor Fails To Present Any First Article On Time, Or The Contracting Officer Disapproves Any First Article, The Contractor Shall Be Deemed To Have Failed To Make Delivery Within The Meaning Of The Default Clause Of This Contract. (f) Unless Otherwise Provided In The Contract, And If The Approved First Article Is Not Consumed Or Destroyed In Testing, The Contractor May Deliver The Approved First Article As Part Of The Contract Quantity If It Meets All Contract Requirements For acceptance. (g) If The Government Does Not Act Within The Time Specified In Paragraph (c) Above The Contracting Officer, Shall, Upon Timely Written Request From The Contractor, Equitably Adjust Under The Changes Clause Of This Contract The Delivery Or Performance Dates and/or The Contract Price, And Any Other Contractual Term Affected By The Delay. (h) Before First Article Approval, The Acquisition Of Materials Or Components For, Or The Commencement Of Production Or, The Balance Of The Contract Quantity Is At The Sole Risk Of The Contractor. Before First Article Approval, The Costs Thereof Shall Not Be allocated To This Contract For 1) Progress Payments, Or 2) Termination Settlements If The Contract Is Terminated For The Convenience Of The Government. The Contractor Is Responsible For Providing Operating And Maintenance Instructions, Spare Parts, And Repair of The First Article During Any First Article Test. (i) The Contractor Shall Produce Both The First Article And The Production Quantity At The Same Facility And Shall Submit A Certification To The Effect With Each First Article. (j) The Test Report (2 Copies) Shall Be In Accordance With Mil-std-831, Unless Otherwise Specified On The Dd1423, And Shall Be Submitted Via The Cognizant Dcmc To Navsup, Attn: (cite Name And Code In Block 10.a Of The Sf33). The Dcmc Shall Provide Comments On form Dd1222 (2 Copies) Which Shall Be Forwarded With The Test Report. Approval Of The Test Report Is The Pco's Responsibility. Upon Notification Of Approval, Condition Approval, The Aco Shall Execute The Dd250 To Indicate Government Acceptance Of The Test report. 4.10 Alternate Offers - Waiver Of First Article Approval Requirements. (the Following Provisions Supersede Any Waiver Of First Article Approval Requirements Terms Set Forth In Clause 52.209-3 Or 52.209-4 As Appropriate) (a) Unless Otherwise Specified In The Solicitation, Navsup Wss Reserves The Right To Waive The First Article Approval Requirements Specified Herein For Offerors Who Have Previously Furnished Identical Production Articles Accepted By The Government Or The original Equipment Manufacturer/prime Manufacturer. An Offeror Requesting Waiver Of First Article Requirements Shall Submit Evidence With Its Offer Establishing That: (i) The Last Production Unit Was Delivered Within Three (3) Years Of The Issue Date Of This Solicitation, And (ii) The Production Location To Be Used For This Requirement Is The Same As Used For The Previous Production Run. additionally, The Offeror Shall Submit A Certification, To Be Executed By The Officer Or Employee For The Offer, Stating That: (i) The Articles To Be Provided Will Be Produced Using The Same Facilities, Processes, Sequences Of Operations And Approved Subcontractors As Those Previously Delivered And Accepted By The Government Or The Original Equipment Manufacturer/prime Manufacturer, and (ii) The Previous Production Units Were Manufactured Without Material Review Board Disposition Or Waiver/deviation Request Or Rejection Of Pre-production Samples For Cause. (note: This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States And The Making Of A False, Fictitious, Or Fraudulent Certification May Render The Maker Subject To Prosecution Under Title 18, United States code, Section 1001.) (b) Offerors Requesting Waiver Of First Article Approval Requirements Under The Provisions Of This Clause Are Cautioned To Submit Two Prices For Articles Required Herein - One That Is Based On Compliance With The First Article Approval Requirements And one That Is Based On A Waiver Of Such Requirements. Where An Offeror Submits Only One Price And Fails To Clearly State That The Price Is Based On Waiver Of The First Article Approval Requirements It Will Be Deemed To Be Based On Compliance With The First article Approval Requirements (c) In The Event Of The First Article Approval Requirement Is Granted, The Delivery Schedule For The Production Items Shall Be Reduced By The Number Of Days Designated For Delivery Of First Article Test Unit Plus The Number Of Calendar Days Indicated For The government Notification Of Conditional Approval Or Approval. These Requirements Are Specified In The Quality Assurance Section Of This Solicitation. If The Offeror Is Unable To Meet The Desired Schedule, He Shall Insert Below The Alternate Delivery Schedule he Offers To The Government. Offeror's Proposed Alternate Delivery Schedule (based On Waiver Of First Article Approval Requirements) within Days: item No. _____________ Quantity:_______ After Date Of Contract:_________ 4.11 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (pco) Mandatory Inspection Is Required And Shall Be Accomplished At Source Under The Surveillance And Final Approval Of The Cognizant Dcmao Quality Assurance Representative (qar). during Production, Mandatory Inspection Is Required To Be Accomplished By The Contractor As Follows: A. Level Of Inspection (loi). 1. Critical Characteristics: 100% Inspection Shall Apply. 2. Major And Minor Characteristics: Loi Shall Be In Accordance With A Sampling Plan Acceptable To The Qar. B. Critical Characteristics: ;the Contractor Shall Accomplish 100% Inspection And/or Testing Of All Critical,and/or Requirements Identified In The Drawings, Drawing Notes, And Process And Results Shall Consist Of Actual Dimensions, Measurements, And Test Outcomes Andincluded In The first Article Test Report. certifications To Be On File For A Minimum Of Seven Years After Delivery Of Contract.; C. Major And Minor Characteristics 1. Shall Be Defined By The Contractor Subject To Qar Concurrence, Unless Defined On Applicable Drawings And Associated Specifications. 4.12 Special Inspection Requirements ( ;n/a; ) Magnetic Particle Inspection ( ;applies; ) Surface Inspection ( ;applies. Liquid; ) Penetrant Inspection ( ;n/a; ) Radiographic Inspection ( ;applies; ) Ultrsonic Inspection ( ;n/a; ) High Shock Test ( ;n/a; ) Mechanical Vibration Test 4.13 Final Inspection Requirement:due To The Critical Nature Of This Item, Representatives Of The Buying office/and The Cognizant Field Activity, Nawc Lakehurst, Shall Be Notified By The Successful Contractor At Least 14 Days Prior To Presentation To The Dcm Qar Of The Items For Final Inspection So That They May Have The Option Of witnessing The Final Inspection. The Contractor Shall Notify By Email Or telefax Pco And Nawc Lakehurst Qa ;lonnie White Nawc Qa Rep At Fax (732) 323-4986; To Arrange For The Final Inspection.the Authority Of The Qar Shall Not Be Abrogated. If The Notification Is Not Given To Both Sites Then The Qar Shall Not Accept The Units. quality Assurance Requirements 1. First Article Testing: the Contractor Shall Conduct First Article Testing On This Item Of Alre/se And Must Address All Elements Listed Below And Prepare A First Article Test Report Documenting The Outcome. Unless Otherwise Specified, The Report And Its Acceptance Shall Be Per The provisions Of The Applicable Contract Data Requirements List (cdrl). a. Requirements: i. First Article Quantity Is One (1); In Uncoated Condition. ii. The First Article Shall Be Available For Government Evaluation Per The Contract Schedule. The Evaluation Shall Be Conducted In The Presence Of The Government Personnel. Accordingly, The Contractor Shall Allow Time To Arrange For Nawc Participation In accordance With The "nawcadlke Inspection Witness Option"; iii. The Contractor Shall Provide Facilities And Personnel Sufficient To Conduct All Necessary Tests To Establish Conformance; iv. The Contractor Shall Have Available For Review All Certifications, Test Repin-process Inspection Documents Needed To Substantiate Product Quality; This Same Documentation Shall Also Be Included In The First Article Test Report; v. The Contractor Shall, At The Time Of First Article, Have Corrected Any Problareas Deemed Significant And Documented As Deficient By The Government Within His/her Quality Assurance System Not Previously Identified During Prior Evaluations And/or Surveys; Any problems Identified During The Conduct Of The Test Will Also Require Correction. b. Testing And Evaluation: i. The Contractor Shall Accomplish 100% Inspection And/or Testing Of All Critic Major, And Minor Dimensions And/or Requirements Identified In The Drawings, Drawing Notes, And Process And Fabrication Specifications. Results Shall Consist Of Actual Dimensions, measurements, And Test Outcomes And Shall Be Recorded And Included In The First Article Test Report. c. Acceptance/reject Criteria: i. Satisfactorily Meeting All Requirements Cited In Paragraph 7a And Satisfactorily Demonstrating 100% Conformance To The Test And Evaluation Elements Cited In Paragraph 7.b Shall Constitute Acceptance Of The First Article. ii. Failure To Meet Any Of The Conditions In Paragraph 7.a And 7.b Shall Be Cause For Rejection. d. Delivery: i. The Accepted First Article Exhibit May Be Delivered And Counted Along With The Contract Production Quantities Providing The Item Has Not Been Damaged During Testing, And Has Been Found To Be Conforming; ii. The Contractor Is Responsible For Preparing The First Article Test Report In Accordance With Cdrl's. /2. Production Lot Special Tests: N/a 3. For Purposes Of This Tdr, The Term Ndt Shall Refer To The Following Methods: Mt - Magnetic Particle Testing, Pt - Penetrant Inspection, Ut - Ultrasonic Testing, Rt - Radiographic Testing, And Vt - Visual Testing. 4. Companies Performing Ndt Shall Be Nadcap Accredited, Or A Laboratory Accredited By One Of The Organizations Listed Below As Satisfying Iso 17025 (general Requirements For The Competence Of Testing And Calibration Laboratories). Ndt Certificates Shall Be Bear the Symbols Of Accreditationand The Accreditation Body. a. American Association For Laboratory Accreditation (a2la) b. Ansi National Accreditation Board (anab) c. International Accreditation Service, Inc. (ias) d. National Voluntary Laboratory Accreditation Program (nvlap) e. Perry Johnson Laboratory Accreditation, Inc. (pjla) f. Canadian Association For Laboratory Accreditation Inc. (cala) g. Standards Council Of Canada (scc) 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable this Is A Alre Critical Safety Item. For Drawing Updates, See Attached Nawc Lke Drawing Update Sheet. navsup Reference Only: Procurement Tdr 23-10116a, the Components Being Acquired Under This Solicitation Have Been Classified As "critical" Requiring Engineering Source Approval By Naval Air Systems Command Only Those Companies Who Have Subm& Been Approved Will Be Eligible For Award Under This Solicitation Any company Submit A Source Approval Request As Outlined In This Solicitation. \ date Of First Submission=asreq 16. Remarks Inspection/certification Data Needed To Substantiate The Quality Of The First Article Test Unit Shall Be Included In First Article Unit Packaging. The Outside Of The Package That Contains The Data Shallbe Clearly Marked "inspection/certification Data included". data Requirements: a. Copies Of All Approved Requests For Variations. b. Torque Per Drawings 34000d1532801, 34000d1532802,34000d1532803. c. Material And Mill Certifications Per Specification, 34000s1580220nd Drawings 34000d1533125, 34000d1530225, 34000d1530216, 34000d1533117,34000d1532961, 34000d1532893, 34000d1532894, 34000d1532960,34000d1562962, 34000d1572525, 34000d1532802,34000d1532804. d. Ultrasonic Inspection Per Drawings 34000d1532804, 34000d1532802. e. Hardness Per Drawings 34000d1532802, 34000d1532804, 34000d1572525. f. Dimensional Inspection Per Drawings 34000d1532802, 34000d1533125,g. Identification Per Drawings 34000d1532802, 34000d1532803,34000d1532804, 34000d1533125, 34000d1530225, 34000d1530216,34000d1533117, 34000d1532961, 34000d1532893, 34000d1532894,34000d1532897, 34000d1532898, 34000d1532960, 34000d1562962,34000d1572525. h. Liquid Penetrant Inspection Per Drawings 34000d1532802,34000d1532804, 34000d1533125, 34000d1530225, 34000d1530216,34000d1533117, 34000d1530223, 34000d1530213. i. Welding Per Navsea S9074-ar-gib-010/278 Per Drawing34000d1530213, 34000d1530223. j. Visual Inspection Of Welds Per Drawing 34000d1562962. date Of First Submission=asreq data Requirements: a. Copies Of All Approved Requests For Variations. b. Torque Per Drawings 34000d1532801, 34000d1532802,4000d1532803. c. Material And Mill Certifications Per Specification, 34000s1580220and Drawings34000d1533125, 34000d1530225, 34000d1530216, 34000d1533117,34000d1532961, 34000d1532893, 34000d1532894, 34000d1532960,34000d1562962, 34000d1572525, 34000d1532802,34000d1532804. d. Ultrasonic Inspection Per Drawings 34000d1532804, 34000d1532802. e. Hardness Per Drawings 34000d1532802, 34000d1532804,34000d1572525. f. Dimensional Inspection Per Drawings 34000d1532802, 34000d1533125, 34000d1530225, 34000d1530216, 34000d1533117, 34000d1532961,34000d1532893, 34000d1532894, 34000d1532897, 34000d1532898,34000d1532960, 34000d1562962, 34000d1572525, 34000d1532804. g. Identification Per Drawings 34000d1532802, 34000d1532803,34000d1532804, 34000d1533125, 34000d1530225, 34000d1530216, 34000d1533117, 34000d1532961, 34000d1532893, 34000d1532894,34000d1532897, 34000d1532898, 34000d1532960, 34000d1562962,34000d1572525. h. Liquid Penetrant Inspection Per Drawings 34000d1532802,34000d1532804, 34000d1533125, 34000d1530225, 34000d1530216,34000d1533117, 34000d1530223, 34000d1530213. i. Welding Per Navsea S9074-ar-gib-010/278 Per Drawing34000d1530213, 34000d1530223. j. Visual Inspection Of Welds Per Drawing 34000d1562962. date Of First Submission=090 Dac the Welding Procedures Will Be Used By The Government To Verify Contractor Designated Welding Responsibilities Implement Weld Procedures For Each Cont Ractor, Subcontractor Or Welding Entity Performing Welding On Specific Work Specifications 16. Remarks (block 5) Data Requirements a. Weld Procedure Iaw Navsea S9074-ar-gib-010/278^ Para 4.2 Per Drawing 34000d1530213 And 34000d1530223. block 13) Date Of Subsequent Submmision: Approval Or Reason For Disapproval Shall Be Given By Navairwarcenacdivlke Via The P.c.o.nlt 45 Days After Disapproval. /(block 14) Addresses For Navair Codes/ navairwarcenacdivlke code Bl14000 Bldg 596 hwy 547 joint Base Mdl, Nj 08733-5000 navairwarcenacdivlke code Bl32300 Bldg 562 hwy 547 joint Base Mdl, Nj 08733-5000/ navairwarcenacdivlke code Bl41600 Bldg 148 hwy 547 joint Base Mdl, Nj 08733-5000 date Of First Submission=090 Dac the Welding Procedures Will Be Used By The Government To Verify Contractor Designated Welding Responsibilities Implement Weld Procedures For Each Cont Ractor, Subcontractor Or Welding Entity Performing Welding On Specific Work Specifications 16. Remarks (block 5 ) Data Requirements a.the Weld Procedure Qualification Test Report, Including All Supporting Test R And Documentation, Iaw Navsea S9074-aq-gib-010/248^ Para 4.2.3 And 4.6 Drawing34000d1530213 And 34000d1530223. (block 13) Date Of Subsequent Submmision: Approval Or Reason For Disapproval Shall Be Given By Navairwarcenacdivlke Via The P.c.o. Nlt 45 Days After Disapproval. (block 14) Addresses For Navair Codes: navairwarcenacdivlke code Bl14000 Bldg 596 hwy 547 joint Base Mdl, Nj 08733-5000 navairwarcenacdivlke code Bl32300 Bldg 562 hwy 547 joint Base Mdl, Nj 08733-5000/ navairwarcenacdivlke code Bl41600 Bldg 148 hwy 547 joint Base Mdl, Nj 08733-5000 date Of First Submission=asreq date Of Subsequent Submission=asreq 16. Remarks (block 5) Contract Reference a. Evidence Of Welder Performance Qualification, Including Supporting Test Resudocumentation, Iaw Navsea S9074-aq-gib-010/248^ Para 5.2 Per Drawing 34000d1530213 And 34000d1530223. (block 12) Date Of First Submission - 30 Days Prior To Production. (block 13) Provide Qualification Evidence For All Welders. (block 14) Addresses For Navair Codes: navairwarcenacdivlke code Bl32300 Bldg 562 hwy 547 joint Base Mdl, Nj 08733-5000 navairwarcenacdivlke code Bl41600 Bldg 148 hwy 547 joint Base Mdl, Nj 08733-5000 date Of First Submission=090 Dac 16. Remarks (block 5) Contract Reference a.evidence Of Level Iii Certification Iaw T9074-as-gib-010/271^ Para 1.6 For The Individual Who Approved The Welders Qualification Training Program Iaw Navseas9074-aq-gib-010/248 Para 5.2.3.1, Per Drawing 34000d1530213 And 34000d1530223. (block 14) Addresses For Navair Codes navairwarcenacdivlke code Bl32300 Bldg 562 hwy 547 joint Base Mdl, Nj 08733-5000 navairwarcenacdivlke code Bl41600 Bldg 148 hwy 547 joint Base Mdl, Nj 08733-5000 date Of First Submission=090 Dac 16. Remarks (block 5) Contract Reference a. Visual Inspection Written Procedure To Be Used To Visually Inspect All Weldst9074-as-gib-010/271^ Para 8.3 And 1.7 Thru 1.7.3 Per Drawing 34000d1530213and 34000d1530223. (block 14) Addresses For Navair Codes navairwarcenacdivlke code Bl32300 Bldg 562 hwy 547 joint Base Mdl, Nj 08733-5000 navairwarcenacdivlke code Bl41600 Bldg 148 hwy 547 joint Base Mdl, Nj 08733-5000 date Of First Submission=090 Dac 16. Remarks (block 5) Contract Reference a. Evidence Of Approval Of The Welder Qualification Training Program Iaw Navseas9074-aq-gib-010/248^ Para 5.2.3.1(d), Per Drawing 34000d1530213 And 34000d1530223. (block 14) Addresses For Navair Codes navairwarcenacdivlke code Bl32300 Bldg 562 hwy 547 joint Base Mdl, Nj 08733-5000 navairwarcenacdivlke code Bl41600 Bldg 148 hwy 547 joint Base Mdl, Nj 08733-5000 date Of First Submission=090 Dac 16. Remarks (block 5) Contract Reference b. Evidence Of Maintenance Of Qualification For All Welders Iaw Navsea S9074-aq010/248^ Para 5.2.11 And 5.2.12 Per Drawing 34000d1530213 And 34000d1530223. (block 14) Addresses For Navair Codes navairwarcenacdivlke code Bl32300 Bldg 562 hwy 547 joint Base Mdl, Nj 08733-5000 navairwarcenacdivlke code Bl41600 Bldg 148 hwy 547 joint Base Mdl, Nj 08733-5000
Closing Date14 Feb 2025
Tender AmountRefer Documents 

EQUAL EMPLOYMENT OPPORTUNITY COMMISSION Tender

Others
Corrigendum : Closing Date Modified
United States
Description: 01/22/2025- The Purpose Of This Amendment A0004 Is To Provide Theattach Questions And Answers For Rfq #45310025q0011- Excel Conference. ______________________________ 01/16/2025-the Purpose Of This Amendment A0003 Is To Provide The Deadline For Questions, Friday, January 17, 2025, 2pm Est. ______________________________ 01/15/2025-the Purpose Of This Amendment A0002 Are As Follows: Extend The Quote Due Date From January 15, 2025, 10 A.m. To February 5, 2025, 10 A.m., Washington, Dc Local Time; And Add “locations” Detroit, Chicago, And Minneapolis For The 2025 Excel Training Conference.see Attachment Sf30_amendment_45310025q0011_a0002_rfq Excel Conference_jdaiisigned ______________________________ 12/31/2024-the Purpose Of This Amendment A0001 Are As Follows: Attach Questions And Answers For Rfq #45310025q0011- Excel Conference; Revision Of Sample Of Lodging Nights (2025 & 2026); And Added Language To The Clin 0005 - Audio/visual (a/v) Requirements (rental) , A/v For Breakout Rooms , "the Contractor Must Provide The Following Equipment: Microphones (1 Wireless And 1 Wired In Each Breakout Room), Projector Screen...." See Attachment Sf30_amendment_45310025q0011_a0001_rfq Excel Conference_jdaiisigned _______________________________ statement Of Work (sow) examining Conflicts In Employment Laws (excel) Training Conference Fy 2025 & Fy 2026 the U.s. Equal Employment Opportunity Commission (eeoc), Revolving Fund Division, Eeoc Training Institute (hereinafter Referred To As The Institute) Has A Requirement For A Contractor To Provide A Full-service Training Facility To Include Lodging, Meeting And Exhibitor Space, Food And Beverage Service, Audio/visual Equipment, Limited Audio/visual Support Services And Business Center Support To Conduct The Annual Examining Conflicts In Employment Laws (excel) Training Conference (hereinafter Referred To As The Conference). This Annual Conference Provides Training To Federal Agencies And Private Employers On The Laws Enforced By The Eeoc. The Institute Anticipates A Minimum Of 600 Registrants With A Maximum Of 1,000 Registrants, Plus An Additional 100 Attendees Consisting Of Other Staff, Presenters, And Exhibitors Who Provide Support For The Conference. the Excel Training Conference Will Be Held For Four (4) Days. The Preferred Schedule Is Pre- Conference Registration Will Be Held On Sunday And The Pre-conference Sessions On Monday. Full Conference Registration Will Be Held On Sunday And Monday. Pre-conference Sessions Will Be Held On Monday (day 1) From 8:00am – 5:00pm. The Full Conference Will Be Held From Tuesday (day 2) At 8:00am, Ending On Thursday (day 4) At 5:00pm. The Plenary Sessions Will Be Held On The Mornings Of Tuesday (day 2), Wednesday (day 3), And Thursday (day 4). breakout Sessions Will Be Held On The Mornings Of Tuesday (day 2), Wednesday (day 3), And Thursday (day 4) After The Plenary Sessions Until 5:00pm. Food And Beverage Service Is Required For Continental Breakfast And For A Light Lunch For Three (3) Days, Tuesday (day 2), Wednesday (day 3), And Thursday (day 4). The Institute Also Requires Morning And Afternoon Breaks Each Day (tuesday-thursday), And A Conference Reception On One Day During The Conference (the Exact Date And Time Will Be Determined Later By The Institute). The Institute May Offer Six (6) Pre- Conference And Post-conference Workshops For Up To 300 People Outside Of The Tuesday - Thursday Conference. requirments For Location And Dates the Contract Must Be Able To Provide A Facility For The Entire Scope Of The Contract. The Eeoc Will Only Accept Quotations For Following Dates And Locations. the Preferred Dates And Locations For The Excel Training Conference In Each Fiscal Year 2025 & 2026 As Follows: the Preferred Dates And Locations For The 2025 Excel Training Conference Are: location: atlanta, Georgia detroit, Michigan chicago, Illinois minneapolis, Minnesota dates: july 12 - July 17, 2025 august 9 - August 15, 2025 august 16 - August 21, 2025 august 23 - August 28, 2025 august 30 - September 4, 2025 the Preferred Dates And Locations For The 2026 Excel Training Conference Are: locations: detroit, Michigan (1st Preference) minneapolis, Minnesota (2nd Preference) chicago, Illinois (3rd Preference) denver, Colorado (4th Preference) phoenix, Arizona (5th Preference) san Diego, California (6th Preference) palm Springs, California (7th Preference) dates: june 6 - June 11, 2026 june 13 - June 18, 2026 june 20 - June 25, 2026 june 27 - July 2, 2026 july 11 - July 16, 2026 july 18 - July 23, 2026 august 22 – August 27 august 29 - September 3, 2026 the Pre-conference And Full Conference Will Be Held From 8:00am – 5:00pm. We Will Require The Use Of The Registration Area For The Pre-conference And Assembling Of Materials One Day Prior To The Pre-conference From The Hours Of 8:00am – 5:00pm. please Indicate Availability For Each Date In The Technical Portion Of The Quotation. No Other Dates Or Combination Of Dates Will Be Considered By The Government. the Government Contemplates The Award Of A Firm-fixed Price (ffp) Contract. the Following Requirements For The Training Facility Are Specified In Terms Of Minimum Requirements. The Contractor Must Meet The Following Minimum Requirements: the Quotation Package Shall Include The Following Line Items In A Written Quotation: schedule Of Supplies And Services Fy 2025: clin 0001, Lodging - Quantity Four 4 Days Each (see Below List Of Lodging Requirements), Unit Price $ , Total For Clin 0001 $ . clin 0002, Rental Of Conference Meeting Space - Quantity 4 Days Each (see Below List Of Conference Meeting Space Requirements), Unit Price $ , $ , Total For Clin 0002 $ . clin 0003, Business Center Services Expenses - Quantity 4 Days, (see Below List Of Business Center Requirements), Unit Price $ , Total For Clin 0003 $ . clin 0004, Food And Beverage Services - Quantity 4 Days (see Below List Of Food And Beverage Requirements), Unit Price $ , Per Person Per Day, Total For Clin 0004 $ . clin 0005, Rental Of Audio/visual Equipment And Technical Support - Quantity 4 Days Each (see Below List Of Audio/visual Requirements), Unit Price $ , Total For Clin 0005 $. total Price For Clins 0001 Through 0005: $fy 2025: clin 0001, Lodging - Quantity Four 4 Days Each (see Below List Of Lodging Requirements), Unit Price $, Total For Clin 0001 $ clin 0002, Rental Of Conference Meeting Space - Quantity 4 Days Each (see Below List Of Conference Meeting Space Requirements), Unit Price $ , Total For Clin 0002 $ clin 0003, Business Center Services Expenses - Quantity 4 Days, (see Below List Of Business Center Requirements), Unit Price $ , Total For Clin 0003 $ clin 0004, Food And Beverage Services - Quantity 4 Days (see Below List Of Food And Beverage Requirements), Unit Price $ Per Person Per Day, Total For Clin 0004 $ clin 0005, Rental Of Audio/visual Equipment And Technical Support - Quantity 4 Days Each (see Below List Of Audio/visual Requirements), Unit Price $ , Total For Clin 0005 $ total Price For Clins 0001 Through 0005: $ Fy 2026. a Contract Will Be Awarded To The Responsible Quoter Whose Quotation Represents The Best Value To The Government. The Quoter Must Be Registered In The System For Award Management (sam) Database At The Time The Quotation Is Submitted. Registration Is Free And Can Be Completed On-line Http://www.sam.gov. Each Quotation Must Clearly Indicate The Capability Of The Quoter To Meet The Requirements Specified In This Combined Synopsis/solicitation. conference General Requirements the Contractor Shall Be A High Quality “full-service” Provider With A Past Performance History That Includes A Minimum Of 3 Years Of Experience As A Primary Contractor With A Professional Staff To Execute The Requirements Specified In This Statement Of Work. All Staff Provided By The Contractor Shall Be Either Direct Employees Of The Contractor Or Employees Of An Approved Subcontractor. The Primary Contractor Shall Have Full Responsibility For The Contractor And Subcontractor Staff And Shall Make Direct Contact With The Contracting Officer’s Representative (cor) To Ensure That All Arrangements Are Mutually Understood Concerning Any Logical And/or Financial Arrangements That May Impact The Eeoc. the Contractor Shall Provide Meeting Space, Food And Beverage And Lodging To Serve 600 To 1,000 Registrants And To Provide Business Services. the Contractor Shall Provide Professional Staff To Organize, Coordinate, And Handle Any Last- Minute Requests, As Well As Execute All Logistical Requirements As Specified In This Sow. The Contractor Shall Make Direct Contact With The Host To Ensure That All Arrangements Are Mutually Understood Concerning Arrival Times, Accommodations, Official Functions, Financial Arrangements, And Any Other Special Information That May Impact This Event. The Contractor Or Their Approved Subcontractors Shall Coordinate And Implement All Logistical Arrangements For This Event. logistical Support May Include, But Is Not Limited To, Coordination Of Meeting Accommodations, Customer Service Or Front Desk Information Service, Conference Rooms, Meal Arrangement/catering, Dedicated Internet, And Audio/visual Equipment. americans With Disabilities Act (ada) Requirements all Facilities, Including Restrooms, Recreational Areas, Dining Space, Registration Area, Meeting Space, Hotel Rooms, Exhibitor Space, Office Space, And Audio/visual Equipment Must Meet Ada Requirements For Accessibility. Accommodations For Individuals With Disabilities May Include, But Are Not Limited To Accessible Hotel Rooms, Parking Spaces, Elevators, And Sound Systems, Wide Aisles, And Wheelchair Ramps. Eeoc Will Perform Site Visits Prior To The Award Of The Contract. The Site Visit Will Include An Ada Assessment Of The Property By The Disability Business And Technical Assistance Centers (dbtac) Prior To Award Of The Contract. clin 0001 – Lodging Requirements the Contractor Shall Provide A Minimum Of 400 Hotel Room Nights For Speakers And Eeoc Staff Working The Event. Space Must Be Available Friday Prior To The Conference Through Friday After The Conference. The Contractor Shall Provide Hotel Rooms At Or Below The Federal Government’s Per Diem Rate For Lodging. The Contractor Will Be Paid For A Minimum Of 400 Hotel Room Nights For Speakers And Eeoc Staff Directly Under This Contract. the Contractor Shall Provide A Room Block For Up To 2000 Hotel Room Nights For Registrants And Exhibitors. The Contractor Shall Provide Hotel Rooms At Or Below The Federal Government’s Per Diem Rate For Lodging. These Individuals Will Be Responsible For Direct Payment To The Contractor. the Institute Will Manage The Hotel Room Block And Will Turn Back Any Unused Rooms To The Contractor, Without Penalty, By A Cutoff Date To Be Determined Upon Award Of The Contract. The Institute Will Provide The Contractor With A List Of Registrants, Exhibitors, Speakers And Eeoc Staff. the Institute Requires The Contractor To Block Up To 400 Room Nights At Or Below The federal Government Per Diem Rate For Lodging During The Week Before And After The Conference For Seminar Registrants And Other Conference Personnel. These Individuals Are Responsible For Paying The Contractor Directly For Lodging Costs. All Room Nights Booked By The Institute Or Conference Registrants Will Be Credited To The Conference’s Sole Account. clin 0002 – Conference Meeting, Exhibitor And Office Space Requirements all Meeting Space Must Be Set Up In Classroom Style With 6' Tables, No More Than 2 People Per Table, Or Round Tables With No More Than 10 People Per Table, Mints, One (1) Pitcher Of Water And a Glasses Per Person At The Table Or Set Up Using Classroom Style. A Podium And Two (2) Tables Located In The Front Of The Classroom Are Required For The Presenters. Rooms Must Have Additional Space To Accommodate A/v Equipment. plenary Room: A Plenary Room That Can Accommodate A Minimum Of 600 Registrants Up To 1,000 Registrants And 100 Presenters/staff In Classroom Style Seating Or Can Accommodate Up To 1,000 Registrants And 100 Presenters/staff Using Round Tables That Seat 10 People And 2 To 4 Comfortable Chairs For The Eeoc’s Chair And Keynote Speakers (large/high Back Chairs) Is Required On Tuesday (day 2) From 8:00am To 12:00pm, On Wednesday (day 3), And On Thursday (day 4) From 8:00am To 10:00am. The Plenary Room Must Have Additional Space To Accommodate A Raised Platform That Is Ada Accessible. This Includes A Platform Which Is No More Than 24” High And Is Wheelchair Accessible On At Least One Side. If A Wheelchair Ramp Is Used, The Ramp Must Have Railings On Both Sides And The Rise Over Run Cannot Be More Than 8.3%. The A/v Requirements Will Be Discussed Below. dining Space (ballroom): A Dining Space Area Within A Separate Ballroom Or Event Space That Can Accommodate Speakers As Well As A Minimum Of 600 Registrants Up To 1,000 Registrants And 100 Presenters/staff. Exhibitor Floor Room Are Not Acceptable Unless Approved. The Ballroom Will Be Set Up In Banquet Rounds Of Ten (10) With An Appropriately Sized Riser To Hold A Podium With Podium Microphone. This Space Is Required On Tuesday (day 2) - Thursday (day 4) From 12:00pm To 1:30pm. Please See The Internet And A/v Sections For Additional Specific Requirements. The Plenary Room And Dining Space (ballroom) Functions Cannot Be Held In The Same Room. breakout Session Rooms: The Breakout Session Rooms Are Required For Monday (day 1), Pre- Conference From 8:00am - 5:00pm Is Six (6) Breakout Rooms As Follows: Four (4) Rooms To Accommodate Up To 100 Registrants, And Two (2) Rooms To Accommodate Up To 75 Registrants. On Tuesday (day 2) From 1:30pm - 5:00pm, On Wednesday (day 3), And On Thursday (day 4) From 10:30am - 5:00pm, The Following Breakout Rooms For The Full Conference Are Required: Two (2) Rooms To Accommodate Up To 300 Registrants; Two (2) Rooms To Accommodate Up To 200 Registrants, And Five (5) Rooms To Accommodate Up To 150 Registrants, And One (1) Room To Accommodate 75 People. The Plenary Session Room Can Also Serve As A Breakout Session Room If Space Is Configured With Air Walls And The Necessary A/v Equipment Is Functional To Accommodate The Full Agenda. speaker-ready Room the Speaker Ready Room Will Be Used By Institute Speakers To Prepare For Their Respective Presentations From 8:00am-5:00pm On Monday – Thursday. The Room Should Be Equipped With 2 Small Tables With Chairs, Lounge Chairs, And Comfortable Seating. The Area Should Be Stocked With Coffee, Tea, And Water Pitchers With Glasses. In Addition, The Speaker Ready Room Should Have A Small Refrigerator And Microwave For Use By The Speakers. exhibitor Space exhibitors Will Be At The Excel Training Conference. Exhibitor Space For Up To 20 Exhibitors Is Required For Monday – Thursday In A Foyer Area Near The Plenary Session, Registration Area Or Dining Space (ballroom) That Accommodate The Am/pm Break Services. Ten (10) Exhibitor Spaces Shall Be Equipped With Two (2) 6’ Tables, Two (2) Chairs And Ten (10) Exhibitor Spaces Shall Be Equipped With One (1) 6’ Table, Two (2) Chairs. The Contractor Will Furnish Tablecloth And Drape For The Front Of The Tables And A Wastebasket Per Exhibitor. The Exhibitors Will Be Responsible For All Additional Equipment And Booth Requirements And Will Work Directly With The Hotel. pre-function Room the Pre-function Room Will Be Used To Assemble Up To Ten (10) Pallets Of Conference Materials And Supplies. This Room Needs To Be Available From 8:00am On The Friday Before The Start Of The Conference Through Friday At 5:00pm The Day After The Conference Ends. The Room Needs To Be Equipped With Carts To Transport Completed Conference Materials To The Registration Areas For The Conference. The Contractor Also Needs To Provide A Secured Office That Can Be Used To Store Laptops, A/v Equipment, And Conference Materials During The Same Time. Only Eeoc Staff Should Have Access To The Secured Office. The Pre-function Room And Secured Office Shall Be Adjoining And Shall Have At Least Eight (8) Tables, Twenty (20) Chairs, Wastebaskets, And Water Pitchers With Glasses. registration And Office Areas the Contractor Needs To Provide Two (2) Registration Areas. One Registration Area Must Be Available From Sunday Afternoon 12:00pm – 6:00pm To Accommodate Pre-conference Registration And From Monday 7:30am – Thursday 6:00pm To Accommodate Registrants, And The Other Registration Area Is Needed From Tuesday – Thursday 7:30am – 6:00pm To Register Staff, Presenters And Exhibitors. Each Area Shall Have Six (6) Tables With Four (4) Chairs Per Table. directional Signage Will Be Provided By The Contractor To The Registration Area. clin 0003 – Business Center Requirements the Contractor Must Be Able To Handle Mailing, Copying, And Faxing Limited Course Materials On- Site. The Institute Typically Receives Four (4) Pallets Of Course Materials, 25 To 30 Packages And A/v Equipment, And Sends Out 50 Packages At The Completion Of The Conference. Contractor Must Provide A List Of All Business Center Charges To Include Labor Charges. clin 0004 – Food And Beverage Requirements the Contractor Shall Provide A Copy Of The Final Price List As Submitted In Response To The Solicitation Food And Beverages For The Conference As Follows: Continental Breakfast, Light Lunch, Breaks (am And Pm) On Tuesday (day Two), Wednesday (day Three) And Thursday (day Four) And One (1) Evening Reception. Pricing For Food And beverage Shall Include The Price For The Item, Plus The Gratuity (service Charge), And A Statement From The Contractor Indicating Whether, And Under What Conditions The U.s. Government Is Exempt From State Tax. tuesday Evening Kick-off Reception: The Food At The Reception Will Consist Of Hors D’oeuvres, Carving Stations, And Finger Foods. The Space Designated For The Reception Must Accommodate Approximately 800 People With Social Seating Available Throughout The Area And The Duration Of The Reception Will Be Approximately 1 Hour, From 5:30pm - 6:30pm. A Cash Bar Will Be Available For All Drinks. continental Breakfast Is Served For 1 Hour From 7:00am - 8:00am Tuesday Through Thursday. The Contractor Must Provide Table Rounds To Accommodate Up To 1,000 People On Tuesday (day 2), Wednesday (day 3), And Thursday (day 4). A Typical Continental Breakfast Shall Consist Of Juice, Fruit, Yogurt, Assorted Breakfast Pastries, Protein, Bagels, Or Croissants, Regular And Decaffeinated Coffee, Tea Bags And Hot Water For Tea, Iced Tea, And Large Containers Of Water. lunch Is Served For 1½ Hours From 12:00pm – 1:30pm. The Contractor Must Provide Table Rounds For Ten (10) And Accommodate 1,000 People. The Dining Space Can Be Used For Breakout Room And/or Meeting Space. A Light Lunch Is Provided On Tuesday (day 2), Wednesday (day 3) And Thursday (day 4). This Can Be Plated, Buffet Or Salad Bar Type Lunch Which Provides A Protein- Based Entrée, A Fruit Or Vegetable, Dessert, Lemonade And Iced Tea. The Entrée Must Not Include Pork, Beef Or Shellfish. 30-minute Am And Pm Breaks Is Required For A Maximum Of 1,000 People. The Am Break Menu Shall Consist Of The Following Beverages (regular And Decaf Coffee, Hot And Iced Tea, And Pitchers Of Water With Glasses) And A Light Snack (cookies, Pretzels, Protein, Etc.). The Pm Break Menu Shall Consist Of The Following Beverages And Pitchers Of Water With Glasses) And A Light Snack (cookies, Pretzels, Protein, Etc.). The Am And Pm Breaks Are Scheduled For 30 Minutes Each, Tuesday (day 2) - Thursday (day 4). the Institute Will Pay The Contractor For Meals, Breaks, And Reception Based On The Actual Number Of Meals Served. clin 0005 – Audio/visual (a/v) Requirements (rental) a/v For Plenary Sessions: The Contractor Shall Provide The Following Items To Support The Plenary Session: Lcd Projectors, Projection Screens, Scan Converters, Video Cameras, A/v Mixers, A/v Drops, Vcr -1, Vgada And Voa Splitter, Cables To Run Two Projectors And Laptops Provided By The Institute, Projection Carts, Pipe And Drape, Stage Wash, Lighting, Podium With Wired Microphones, Wired Table Microphones W/stands, Wireless Floor Microphones W/stands. The Institute Requires Internet Access In Plenary Sessions And All Breakout Sessions. The Contractor Must Provide Internet Service In The Plenary Room. The Contractor Must Setup, Breakdown And Provide Technical Support Of The A/v Equipment During The Plenary Sessions. a/v For Breakout Rooms: The Institute Will Provide All Laptops And In-focus Projectors Used In The Breakout Rooms. The Contractor Must Provide The Following Equipment: Microphones (1 Wireless And 1 Wired In Each Breakout Room), Flip Chart/ Paper And Markers, Gender Adapters, Electronic Signage Or Tripods Outside Breakout Sessions, And Projection Cart With A/v Connection. The Institute Requires Internet Access Throughout The Entire Breakout Rooms. The Contractor Must provide Projected Cost For The Internet Service In The Breakout Rooms. registration Area: The Institute Requires An Internet Connection Which Will Be Used With A Hub Throughout The Conference To Include Registration, A/v Connection, And Phone For Local Calls Within The Conference Space. In Addition, The Institute Requires A Multifunction-colored Printer To Be Used Through The Conference To Include Registration. common Registration Area: The Institute Requires An Internet Connection Near Registration To Be Used With A Hub For The Completion Of Conference Evaluations. This Will Be Set Up To Support At Least (6) To (8) Laptops Which Will Be Provided By The Institute. reporting Requirements pre-conference Reporting: The Contractor Will Provide The Institute’s Contracting Officer’s Representative (cor) With An Electronic List Of All Hotel Confirmation Numbers For All Participants, Staff And Presenters On A Weekly Basis Starting Eight (8) Weeks Prior To The Conference. The Institute Cor Will Manage The Conference Room Block Up To 15 Calendar Days Prior To The Conference. From Fourteen (14) Calendar Days Before The Conference Through The Duration Of The Conference, The Contractor Will Manage The Conference Room Block. during The Conference Requirements a Pre-conference Meeting Will Be Conducted With The Contractor And Key Institute Staff Within Five (5) Business Days Prior To The Conference. daily Event Meeting Will Be Conducted With The Contractor And Key Institute Staff Daily As Agreed. signature Authority: All On-site Charges Must Be Approved And Signed Only By The Institute’s Cor And/or The Eeoc Contracting Officer. daily Reconciliation: The Contractor Shall Provide A Daily Reconciliation List To The Institute Cor By 9:00am The Following Business Day After The Charges Are Incurred. These Charges Include Lodging Paid By Eeoc, Food And Beverage, A/v Equipment And Labor, And Business Center. post-conference: The Contractor Shall Submit A Final Invoice Of All Charges Within Five (5) Business Days After The Completion Of The Conference. A Detailed Report Should Be Submitted With The Invoice And Should Consist Of A Detailed Banquet/event Order (beo) Form. The Beo Must Provide The Following Information: Room Usage By Date; Detailed Lodging Charges For All Registrants, Staff And Presenters For The Conference; Detailed Breakdown, By Day, For All Food And Beverage Charges; A Detailed Breakdown By Day And Room Number, For All A/v Equipment Rental Charges And A/v Support Charges; All Business Center Cost; And All Miscellaneous Costs To Include But Not Limited To Internet Connections, Re-keying Charges, Electrical Hook-ups, Etc. general Requirements transportation: The Contractor Shall Provide A Price List Of All Local Transportation Options To And From The Airport And Rail Station, If Applicable. The Contractor Shall Indicate In Its Quotation Whether It Provides Free Or Low-cost Shuttle Services. The Contractor Shall List All Facility Parking Discounts And Cost Options. The Contractor Shall Provide A List Of All Local Restaurants Located Within A Ten (10) Minute Walk From The Contractor’s Facility. security: The Contractor Should Identify If They Have Paid Security Within The Facility And Provide A List Of Additional Security Measures Taken By The Contractor To Provide For The Safety Of Conference Registrants, Staff, Presenters And Equipment. list Of Deliverables logistical Support Plan: Within Seven (7) Business Days Of The Contract Award, The Contractor Shall Comprise A Detailed Logistical Support Plan For Provision Of All Required Support. The Plan Will Include A Proposed Budget And Detailed Schedule As Applicable. The Eeoc Shall Review The Logistical Support Plan And Provide Acceptance And/or Comments To The Contractor. The Contractor Shall Be Available To Eeoc For Weekly Status Reports To Facilitate The Coordination Of Evolving Operational And Logistical Issues Regarding The Tasks Outlined In The Sow. account Reconciliation: Eeoc Requests That The Hotel Bill Be Prepared In A Logical And Chronological Sequence And That Backup Data Accompany The Bill. The Contractor Shall Complete Its Accounting Of The Conference Within Five (5) Days Of The Conclusion Of The Conference. invoicing: The Contractor Shall Invoice The Eeoc At The Agreed Upon Rates For Lodging, Conference Space, Rental Of Audio/visual Equipment And Technical Support, Food And Beverage Service, And Business Center Services. Charges For Food And Beverage Service Shall Be Reflected On The Invoice As The Cost Incurred Per Person. the Contractor Shall Submit A Final Invoice Of All Charges Within Five (5) Business Days After Completion Of The Conference To The Cor And The Cor Shall Be Provided At Least Five Business Days To Review The Invoice Charges And Services Provided For Acceptance. contract Administration contracting Officer’s Representative (cor) – Tbd Method Of Payment pursuant To Far Clause 52.232-33 Entitled, “payment By Electronic Funds Transfer – System For Award Management (oct 2018)”, The Government Intends To Make A Payment Via Electronic Funds Transfer Using Information Provided In The System For Award Management (sam) Database. cancellation should Eeoc Elect To Cancel This Contract, Eeoc Will Provide A Written Notification To The contractor No Later Than Sixty (60) Calendar Days Prior To The Scheduled Event. By Receipt Of This Cancellation Notice, The Contractor Agrees To Release Eeoc From Any Cancellation Penalties Or Charges. If There Is A Cancellation Within Sixty (60) Calendar Days Of The Scheduled Event Date, Paragraph (l) Termination For The Government’s Convenience Or (m) Termination For Cause Of Far Clause 52.212-4, Contract Terms And Conditions – Commercial Products And Commercial Services Will Govern. submission Of Quotation: All Interested Parties Shall Submit With Their Quotation A Detailed Breakdown Of All Costs To Include Conference Space, Rental Of Audiovisual Equipment And Technical Support, Food And Beverage Service, Business Services, And Any Other Miscellaneous Services And Equipment Which Are Necessary For The Success Of The Conference. quotations Shall Be Submitted In Three (3) Separate Volumes As Follows: Volume 1 - Technical Capability; Volume 2 - Past Performance; And Volume 3 - Price. Pricing Must Be Submitted Using The Line-item Structure In The Above Schedule Of Supplies And Services Of This Rfq. A Separate Attachment May Be Included In Volume 3 For Pricing Information On Menu Items, Transportation, Parking, Applicable Tax Rates, And Sleeping Room Rates. Your Quotation In Response To Solicitation Number 45310025q0011 Is Due January 15, 2025, At 10:00 A.m. Et (washington, D.c. Local Time). Quotations Will Be Accepted Via E-mail. One (1) Electronic Copy Of The Quotation May Be Submitted Via E-mail, Addressed To John.adams@eeoc.gov And R.rashelle.anderson@eeoc.gov. questions: Questions Regarding This Request For Quotation Should Be Submitted To John Adams, Contract Specialist Via E-mail At John.adams@eeoc.gov And Gov Contracting Officer At R.rashelle.anderson@eeoc.gov Telephone Inquiries Or Responses Are Not Acceptable. The Deadline For Submission Of Questions Regarding Solicitation Number 45310025q0011 Is Due December 20, 2024, 10:00 A.m. Et (washington, D.c. Local Time). Any Questions Received After The Above- Mentioned Date And Time Will Not Be Considered. The Government Will Not Reimburse Interested Parties For Any Cost Associated With Responding To This Business Opportunity. All Responsible Sources May Submit A Quotation Which Shall Be Considered By The Agency. The Anticipated Contract Award Date Is On Or Before March 18, 2025. basis For Award: The Government Intends To Award A Firm Fixed-price Contract To The Responsible Quoter Whose Quotation Is Responsive To The Solicitation And Is Determined To Be The Best Value To The Government, Using The Tradeoff Approach. Selection Of The Best Value To The Government Will Be Achieved Through A Process Of Evaluating The Strengths And Weaknesses Of Each Quoter’s Quotation Against The Below Described Evaluation Criteria. In Determining The Best Value To The Government, The Technical Capability And Past Performance Evaluation Criteria, When Combined, Are More Important Than The Evaluated Price. The Government Is More Concerned About Obtaining A Superior Technical Capability Quotation Than Making An Award At The Lowest Evaluated Price. However, The Government Will Not Make An Award At A Price Premium It Considers Disproportionate To The Benefits Associated With The Evaluated Superiority Of One Technical And Management Quotation Over Another. Thus, To The Extent That Quoter’s Technical And Past Performance Quotations Are Evaluated As Close Or Similar In Merit, The Evaluated Price Is More Likely To Be A Determining Factor. evaluation Factors For Award: The Following Factors Shall Be Used To Evaluate Quotations. These Factors Are Listed In Their Relative Order Of Importance: Technical Capability, Past Performance, And Price. factor I – Technical Capability: contract Requirements: Quotations Will Be Evaluated On The Quoter’s Ability To Provide All The Contract Requirements Relating To Lodging, Meeting Space, Food And Beverage, Av Support And Equipment, Business Center, And Comply With The Reporting Requirements. Quotations Must Address The Quoter’s Ability To Comply With The Americans With Disability Act (ada) As It Relates To Lodging And Meeting Space. Quotations Will Be Evaluated On The Quality Of The Customer Services Provided And The Quality Of The Facilities Reflected In Maintenance And Upkeep Of The Facilities. location: Quotations Will Be Evaluated On The Ability Of Quoter To Provide A Centrally Located Facility With Inexpensive Transportation Options To And From The Airport. Additionally, Restaurants Must Be Within A Short Walking Distance Of (ten (10) Minutes Or Less) Of The Proposed Facility. quotations Must Address Safety And Security Issues Both Within The Hotel Complex And The Surrounding Area. availability Of Dates: Quotations Will Be Evaluated On The Ability Of The Quoter To Provide The Required Services On The Dates Requested. Additional Consideration Will Be Given To Quotations Which Demonstrate Availability Of Facilities On The Preferred Dates In Order Of Preference (i.e., 1st Choice Date, 2nd Choice Date, 3rd Choice Date, Etc.) factor Ii – Past Performance: the Quoter Must Provide References For A Minimum Of Three (3) Government Or Non-government Contracts Which Provide The Same Or Similar Services; Contracts Must Have Been Awarded Within The Past (3) Years. The Information For Each Reference Shall Include The Following: name And Address Of Government Agency And Other Non-government Client; name, Title, Email And Telephone Number Of Contracting Officer Or Other Point Of Contact; name, Title, Email, And Telephone Number Of Client’s Program Manager, If Applicable; contract Number, Period Of Performance, And Total Dollar Value Of Contract; And description Of Services Provided. list Any Problems Encountered On Each Contract And The Quoter’s Corrective Actions. Eeoc Will Evaluate Past Performance Based On Timeliness, Customer Service And Corrective Actions Taken (if Necessary). a Quoter Without A Record Of Relevant Past Performance Or For Whom Information On Past Performance Is Not Available Will Not Be Evaluated Favorably Or Unfavorably On Past Performance. factor Iii – Price: the Price Quotation Will Be Evaluated Against The Independent Government Price Estimate. Evaluations Of Quotations Will Consider The Following Pricing Information: Pricing Provided For All Line Items Listed In The Schedule Of Supplies And Services Of This Rfq In The Units And Format Provided. site Visits: The Eeoc Will Conduct A Site Visit Of All Quoters Who Are Rated To Be Technically Acceptable. The Site Visit Will Review And Evaluate The Same Technical Items Identified In The Technical Capabilities Portion Of The Technical Evaluation Factor. supplemental Agreements if Any Hotel Submitting A Quotation Has Any Supplemental Agreements, Those Agreements Must Be Submitted With Their Quotation. If The Hotel Requires Signature Of A Supplemental Agreement That Was Not Submitted With The Quotation, The Quotation Will Be Rejected. notice: The Government Intends To Evaluate Quotations And Make Award Without Discussions (except Clarifications As Described In Far 15.306(a)). Therefore, The Quoter’s Initial Quote Should Contain The Vendor’s Best Terms From A Price And Technical Standpoint. The Government Reserves The Right To Conduct Discussions If The Contracting Officer Later Determines Them To Be Necessary. period Of Performance the Base Period Is From The Date Of The Award Through The Execution Of The Fy 2025 Excel Training Conference. the Eeoc Is An Agency Of The U.s. Government. Contracts With The Eeoc Are Governed By The Federal Acquisition Regulation (far). To The Extent That Any Provision Of This Agreement Conflicts With The Far, The Far Must Control. applicable Provisions And Clauses: The Provisions At 52.212-1, Instructions To Offerors - Commercial Products And Commercial Services Applies To This Acquisition. The Vendor Shall Include A Completed Copy Of The Provisions At 52.212-3, Offeror Representations And Certifications - Commercial Products And Commercial Services, With Your Quote. the Contracting Officer Has Determined That Paragraph 52.212-3(k)(2) Which Pertains To Exemption From The Application Of The Service Contract Labor Standards Applies. The Clause 52.212-4, Contract Terms And Conditions-commercial Products And Commercial Services And Clause And 52.212-5 Contract Terms And Conditions Required To Implement Statutes Or Executive Order-commercial Products And Commercial Services Are Incorporated By Reference. clause 52.203-6 Restrictions On Subcontractor Sales To The Government Alternate I, Clause 52.203-17 Contractor Employee Whistleblower Rights clause 52.203-19 Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements, Clause 52.204-10 Reporting Executive Compensation And First –tier Subcontract Awards, Clause 52.204-23 Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities, clause 52.204-12 Unique Entity Identifier Maintenance clause 52.204-13 System For Award Management Maintenance clause 52.204-25 Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment, clause 52.209-6, Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment, clause 52.209-10 Prohibition On Contracting With Inverted Domestic Corporations, clause 52.217-9 Option To Extend The Term Of The Contract, (a) The Government May Extend The Term Of This Contract By Written Notice To The Contractor Within 30 Days Prior To The Contract Expiration Date, Provided That The Government Gives The Contractor A Preliminary Written Notice Of Its Intent To Extend At Least 60 Days Before The Contract Expires. The Preliminary Notice Does Not Commit The Government To An Extension. (b) If The Government Exercises This Option, The Extended Contract Shall Be Considered To Include This Option Clause. (c) The Total Duration Of This Contract, Including The Exercise Of Any Options Under This Clause, Shall Not Exceed 36 Months. (end Of Clause) clause 52.222-3 Convict Labor, clause 52.222-19 Child Labor – Cooperation With Authorities And Remedies, Clause 52.222-21, Prohibition Of Segregated Facilities clause 52.222-26, Equal Opportunity, clause 52.222-35 Equal Opportunity For Veterans, clause 52.222-36 Equal Opportunity For Workers With Disabilities, Clause 52.222-37 Employment Reports On Veterans, clause 52.222-40 Notification Of Employee Rights Under The National Labor Relations Acts, clause 52.222-41 Service Contact Labor Standards, Clause 52.222-50 Combating Trafficking In Persons, clause 52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving, clause 52.225-13 Restrictions On Certain Foreign Purchases, Clause 52.232-1 Payments clause 52.232-33, Payment By Electronic Funds Transfer – System For Award Management Clause 52.232-40, Providing Accelerated Payments To Small Business Subcontractors, Clause 52.233-3 Protest After Award, clause 52.233-4 Applicable Law For Breach Of Contract Claim, And clause 52.222-53 Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements. to Obtain The Above Provision/clauses In Full Text, Please Visit Https://www.acquisition.gov/far see Attachment- Custom Clause For Electronic Invoicing
Closing Date5 Feb 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n743.35|wwj|717-605-8399|tiana.hammaker@navy.mil| item Unique Identification And Valuation (mar 2016)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specifications Section C And Section E| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance - Short Version (jun 2002)|8|x||x|||||| time Of Delivery (june 1997)|20|0001|5|180|||||||||||||||||| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (dec 2018)|16|invoice And Receiving Report (combo)||tbd|n00104|tbd|tbd|n50286|tbd|||n/af|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year|365 Days After The Last Delivery Under This Contract ||||| warranty Of Data--basic (mar 2014)|2||| buy American --free Trade Agreements--balance Of Payments Program - Basic(deviation 2020-o0019) (jul 2020))|3|||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (nov 2020)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate (deviation 2020-o0019) (jul 2020))|3|||| buy American-balance Of Payments Program Certificate-basic (nov 2014)|1|| annual Representations And Certifications (mar 2020)|13|335312|1250|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| evaluation Criteria And Basis For Award-|1|| solicitation Due Date Has Been Extended. quantity Has Been Incrased To 6. solicitation Due Date Is Hereby Extended. 1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg. 2. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Here In. 3.the Following Proposed Delivery Schedule Applies: submission Of All Certification Data Cdrls 20 Days Prior To Delivery. pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt final Delivery Of Material (180 Days) \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 1.1.1 Dssp Scope Of Certification Material - Material Control Division ;(b); Applies To This Material. 1.1.2 This ;motor Controller Ay; Contains Non-metallic Materials Which Must Satisfy The Toxicity And Flammability Requirements Of Navsea Ss800-ag-man-010/p-9290. Use Of Any Material Other Than That Specified Requires Special Engineering Approval And May require Testing. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.3 Specification Revisions - The Specification Revisions Listed Under "docu Ments References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.3.1 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order. drawing No Cage Rev Distr Cd ;50271205 95310 E B; 2.3.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. drawing Data=8500400 |53711| B| |d|0001 | |49998|1165538 drawing Data=8500409 |53711| C| |d|0001 | |49998|4778725 document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-i-45208 | | |a |810724|a|1 | | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=ss800-ag-man-010/p-9290 | | | |200424|a| |04| 3. Requirements 3.1 ;the Motor Controller Ay Must Be Made In Accordance With Navsea Drawing 8500409 Item 41-5 Ac Winch Controller, Except As Amplified Or Modified Herein.; 3.2 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below. 3.3 ;ac Winch Controller In Accordance With Crane Midwest Dwg 50271205 Requires Implodable Volume Testing.; 3.4 Testing For All Critical Implodable Volumes Must Include Submergence Pressure Test To ;134 Psig; For 10 Cycles: - Ten (10) Minutes At Test Pressure For Cycles 1-9 - One (1) Hour At Test Pressure For Cycle 10 the Test Must Be Conducted In 35 Degrees Fahrenheit Seawater If Practical. Leakage Or Visible Signs Of External Damage Must Be Cause For Test Failure. Pressure And Temperature Testing Equipment Used To Perform This Test Must Be Calibrated. Pressure Gauges Used for This Testing Must Conform To The Following: 3.4.1 Selecting Master Hydrostatic Test Gages. When Selecting A Hydrostatic Test Gage, The Test Gage Range Should Be Greater Than The Test Pressure But Should Not Be More Than Twice That Of The Maximum Test Pressure Except For Test Pressures Below 60 Psi As indicated On The "master Gage Selection For Hydro". See Reference Number Csd012 Of The Contract Support Library Page Of The Electronic Contractor Data Submission (ecds) System At Https://register.nslc.navy.mil/ 3.4.2 Master Hydrostatic Test Gages And Backup Gages Must Have An Accuracy Of At Least +1.0 Percent Of Gage Span. In Addition, Master Hydrostatic Test Gages Must Have Graduations Equal To Or Smaller Than Those Shown In Table 504-6-1. Backup Gages May Be installed With Dial Sizes Of 4 1/2 Inches Or Larger. 3.5 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig/-0psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of Thesmallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. 30 Minutes / - 0 Minutes. Above 2500 Psig, The Pressure Tolerance Must Be +2%/-0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. The Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In this Contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be + 60 Minutes/- 0 Minutes. 3.5.1 A Copy Of The Final Waiver/deviation (both Approved And Disapproved) Must Be Forwarded With The Applicable Asset(s). 3.6 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.7 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.7.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.7.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/ 3.7.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.8 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. ^ Quality Assurance Requirements ^ 3.9 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.9.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.9.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.9.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Deep Submergence Systems Program (dssp) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) prior To Award Of Any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At Navicp-mech May Request The Pco Waive This Requirement. 3.9.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.9.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.10 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved and Rejected And The Nature Of Corrective Action Taken As Appropriate. 3.10.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.10.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions provided By The Government Representative. 3.11 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured/performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization Of the Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being Purchased. when The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon Receipt Of this Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract management Agency (dcma) Office. In The Event That A Local Government Representative Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.12 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.12.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.12.2 Inspection For Completeness And Proper Type. 3.12.3 Verification Of Material Quality Received. 3.12.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.12.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.12.6 Identification And Protection From Improper Use Or Disposition. 3.12.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.12.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.12.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.13 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Dssp Systems, It Is Imperative That Traceability Be Maintained From The Material To All Required Objective Quality Evidence (oqe). 3.13.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified Elsewhere In The Contract/purchase Order. 3.14 Material Traceability - Traceability Markings Must Be Permanently Applied To The Material In Accordance With Mil-std-792 Or To A Tag Affixed To The Material, And Annotated On The Required Oqe. The Traceability Marking May Be Any Vendor Traceability number/code Which Provides Complete Traceability To The Required Oqe. Traceability Marking/identification May Include Such Items As Nomenclature, Part Number, Technical Description, National Stock Number (nsn), Etc. Traceability Must Be Maintained Through All process Operations Including Any Subcontracted Operations, To The Finished Component. 3.14.1 When Traceability Markings On The Material Would Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, an Appropriate Material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. the Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Material Or Loss Of Traceability. The Traceability Marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.14.2 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings On The Material, Purchase Or Work Orders Must Specify A method And Marking Location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.15 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.15.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.15.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.15.3 All Oqe Required By The Contract And All Data Concerning Material Traceability (oqe To Traceability Marking) Must Be 100% Inspected. The Certification Test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.16 Test Certification - When Test Certifications Are Required Elsewhere In The Contract, Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" are Not Acceptable. 3.16.1 If Material Is Received Without The Required Test Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.17 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address, Phone Number And Date. 2. The Contract/purchase Order Number (i.e. N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9digit Niin, And The Two Digit Smic (i.e. 1h 4820 012345678 D4) 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds. ("n/a" When Not Applicable). 5. Cure Date ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement For Any Hull, Mechanical And Electrical (hm&e) Testing Required That Include The Name Of The Test And That It Was Performed Satisfactorily. If No Hm&e Testing Is Required, The Statement Should Read "hull, Mechanical And Electrical (hm&e) Testing n/a." 9. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements. 10. Contractor's Or Authorized Personnel's Signature. 3.17.1 For Connectors, Cables, And Junction Boxes Procured To Eb Specs S-5343934-1, S-5343934-2, Or S-5343934-3, The Certificate Of Compliance Must Also Include The Information Below: 11. A Notation That 32 Root Mean Square (rms) Finishes Are In Accordance With The Specifications And Are Free Of Imperfections. 12. Direct Reading Of O-ring Surface Diameters With Specified Standard. 3.18 See Cdrl Di-misc-80678 (soc Critical Volume Testing) - The Critical Volume Test Record (implodable/explodable), As A Minimum, Must Include The Following Information: A. Name(s), Model Number(s), And Serial Number(s) Of Component(s) Tested. B. Date Of Test. C. Serial Number(s) Of Gage(s) Used For The Test. D. Last Calibration Date Of The Pressure Gage(s) Used In The Test. E. Next Calibration Due Date Of The Pressure Gage(s) Used In The Test. F. Test Medium Temperature Required And Actual Test Medium Temperature Used. G. Pressure Range And Accuracy Of Gage(s) Used. H. Test Pressure For Each Pressure Cycle. I. Required And Actual Duration Of Each Pressure Cycle. J. Results Of The Test (i.e., Sat Or Unsat) Per The Above Criteria. K. Printed Name(s) And Signature(s), Or Identification Number(s) And Signature(s) Of Test Conductor(s)/inspector(s), And The Date Of Each Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification. 6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order. ;- 10/20/2016 - Updated Ecds Url - Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed - Oct 29 2010 - Added Sampling Std For Li In-process Testing - Sep 30 2008 - Thread Inspection Requirements Were Clarified - Dec 17 2011 - Began Using Ecds For Submissions - Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe - Dec 17 2011 - Moved Quality Assurance Text Location For Readability - Jan 19 2011 - Added Notification Of Dcma Upon Contract Award - Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section - Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section; date Of First Submission=asreq paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
Closing Date7 Feb 2025
Tender AmountRefer Documents 

DEPARTMENT OF EDUCATION SCHOOLS DIVISION OF EASTERN SAMAR Tender

Education And Training Services
Philippines
Details: Description Procurement Of Inclusive Learning Resource Centers Assistive Devices, Equipment, Supplies And Materials (lot 3- Support Service Area: Physical Therapy Area) 1. The Deped Schools Division Of Eastern Samar, Through The General Appropriation Act Of 2024 Intends To Apply The Sum Of ₱ 359,916.00 Being The Abc To Payments Under The Contract For Procurement Of Inclusive Learning Resource Centers Assistive Devices, Equipment, Supplies And Materials (lot 3- Support Service Area: Physical Therapy Area) Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Deped Schools Division Of Eastern Samar Now Invites Bids For The Above Procurement Project. Bidders Should Have Completed, Within 5 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. 4. Prospective Bidders May Obtain Further Information From Deped Schools Division Office Of Eastern Samar And Inspect The Bidding Documents At The Address Given Below During Monday-friday, 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Php 500.00. It May Also Be Downloaded From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Nonrefundable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Deped Schools Division Of Eastern Samar Will Hold A Pre-bid Conference On January 13, 2025, 10:00am At The Bac Office, Deped Schools Division Of Eastern Samar Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before January 27, 2025, 9:00am Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 27, 2025, 10:00am At The Given Address Below Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. Only The Proprietor Or Authorized Representative May Be Allowed To Purchase Bidding Documents. Letter Of Intent (loi), Special Power Of Attorney (spa) (for Authorized Representative), And Drl (document Request List From Philgeps) Are Required Upon Purchase. 11. The Deped Schools Division Of Eastern Samar Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Items, Specifications, Quantity Of Delivery, And Abc: Cabinet, 4' X 6' Double Door (3/4 Plyboard, Varnish Paint) Set 1 Wooden Cubicle Partition, 4 Panel Divider (l 70.25 Inches X H70.25 Inches X T0.75 Inches) Set 4 Mirror, Aluminum Frame (thickness 1/4 Inch X 4 X 8 Ft) Set 1 Filing Cabinet, Vertical Filing Cabinet In 2, 3 And 4 Drawers With Plastic Divider And Central Lock Heavy Duty Construction Assembles In Minutes Power Coated Finish Anti-tilt Mechanism Quiet Closing 3 Sectional Railings For Smooth Actions Central Locking System Unit 1 Learners'/clients' Chart Materials, High Quality Abs Body, Moulded Light Blue, Pink, Grey Color, Size: 340×230mm Unit 10 Anatomical Models, Brand New, High Quality, 1/2 Life Size Can Be Disassembled Into 27 Parts Hand Numbered With Key Guide Anatomically Accurate A Perfect Tool For Teaching/studying Human Muscular And Organs Anatomy Set 1 Blood Pressure, Product Details Type: Upper-arm Monitor Type: Digital Cuff Size: 32cm Dimension (w X H X D): 145 X 466 X 145mm Weight: 250g Technical Details Power Supply: Battery Battery Type: Li-polymer Features Smart App Availability: Yes Automatic Shut Off: No Low Battery Indicator: No Connection Bluetooth: No Wi-fi: No Unit 2 Stethoscope, Product Name: Dual Tube Stethoscope Weight: 185g Length: 80cm Product Material: Polymer Diaphram Listener Material: High-density Stainless Steel Product Composition: Eartip, Ear Hooks, Leaf Spring, Hose Heads, Diaphrams Unit 2 Tape Measure, Material: Pvc It Has Centimeter Scale On Reverse Side Which Is Up To 300cm Large, Easy To Read Marking Measures Up To 120 Inches Piece 2 Hand Dynamometer, Type: Electronic Counting Gripper Function: Comprehensive Fitness Exercise Material: Abs Size: 15cm/5.90"x10.5cm/4.13"x2cm/0.79" Piece 2 Ice Massage Caps, Size: 2 Count (pack Of 1) Measuring 2.9” In Diameter, The Ice Cup Massager Holder Also Fits Comfortably In The Hand. Material: Polyethylene Pack 3 Foam Rolls, Material: Expanded Polypropylene Foam Item Weight: 0.42 Pounds Size: 18 Inches Piece 4 Balance Board, Type: Rocker Board Dimensions: 32.28 X 11.81 X 0.59 Inches Weight Capacity: 100 Kg Material: Beech Wood Anti-skid Feature: Not Specified Unit 2 Treatment Table, Product Name: Multi Functions Physical Electric Therapy Treatment Table Size: L2040*w560*h550-820mm Product Feature 1. Electric Operation,3 Sections, New Design Epoxy Metal Frame. 2. Equipped With 3 Motors For Height, Back And Leg Rest Adjustment. 3. Height Adjustments For The Arm Rests. 4. With Artificial Leather Cover On The Head, Seat, Leg Areas. 5. 4 Luxurious Castors With Brake. Function: Suitable For Hospital Electric Therapy Treatment Table Use. Unit 1 Mat Table, Wood Construction Adds Strength And An Attractive Natural Finish. Supports Up To 500 Lbs For Better Patient Accommodation. Heavyweight Vinyl Upholstery Is Comfortable And Strong. Thick Foam Padding Provides Patient Comfort For A Better Experience. Five-leg Design With Center Support Ensures Stability Through Heavy Treatment. Height: 18" Weight Capacity: 500 Lbs Size: 4 Ft Wide X 7 Ft Long Unit 1 Adjustable Height Exercise Steps, Color: Teal/purple Brand: Us Weight Item Weight: 80 Ounces Item Dimensions Lxwxh: 30 X 15 X 8 Inches About This Item Made In The United States From Durable, Recyclable High-density Polyethylene Circuit-size (28. 5" L X 14. 5" W X 4" H) Aerobic Platform, 4 Original Risers, And Streaming Videos Platform Features Grooved, Nonslip Top And Supports Up To 275 Lbs Four Nonskid Feet On Each Riser And Platform Prevents Sliding Or Scratching Floors Vary Workout Difficulty By Adjusting Platform Height From 4" To 6" To 8" Using Risers Unit 1 Pediatric Examination Gowns, Opening: Full Open Back Style: Child Size Color: Jellybean Print Made With High Quality, 100% Cotton Comfortable, Durable, Washable, And Reusable Hook And Loop Closures At Neck And Mid-back Piece 5 Towels, Material: High Quality 100% Cotton Terry – 500gm2. Size: 90 X 180cm. Piece 10 Bed Sheets, Waterproof 5.5 Mil Vinyl Contoured Corners, Fitted 36" X 80" X 6" Case Of 12 Pack 5 Pillows, Pillow Shape: Rectangle Pillow Weight: 0.95-1000 Grams Pillow Height: 12.7cm Pillow Width: 40.64cm Pillow Length: 66.04cm Pillow Size: 40 X 66 Cm Pillow Material: 100% Cotton Pillow Filing: Cotton Poly-fiber Piece 4 Pillowcase, 2pcs Pillowcase Size: 1 X 28 Inches Material: Cotton & Polyester Set 10 Blankets, 100% Canadian Cotton, Soft Texture, High Quality Fabric Size: 52 X 90 Inch Piece 10 Step Stools, Double Steel Caravan Step. Rubber Non- Slip Steps. Leg Distance Front To Back 65 Cm. Width 42 Cm. Top Step Height 38 Cm. Bottom Step 20 Cm. Unit 2 Therapist Stools On Wheels, Description: This Stool Can Be Adjusted To Just About Any Position You Want, Making It Incredibly Versatile And Comfortable. It Has A 360-degree Swivel So You Can Quickly Spin Around To Access Anything You Need At Home Or In The Office. The Unique Saddle Seat Has Thick Padding, Making It Easy For You To Stay In The Same Place For Hours At A Time. Unit 2 Wedge Bolsters, Use A Wedge Bolster Along With Our Quicklock Face Rest Platform To Create A Quick And Easy Backrest For Any Portable Or Stationary Massage Table. Dimensions: 24"w X 10"h X 24"l With A Flat Top And A 36" Incline. Piece 1 Round Bolsters, 6" Round Bolster Bolsters Are Made With Earth Friendly Materials Of Cfc Free Foam And Pvc Free Upholstery Choices. High Quality Foam Offers Comfortable Support And Allows Clients To Fully Relax, And Come With Pull Handles At Both Ends For Therapist Convenience. Unlimited Versatility Makes This Comfortable And Supportive Cushion Your Building Block For Positioning. Measures 6" D X 26" L. Made Of Aero-cel Foam: Won't Flatten Or Get Lumpy Like Dacron Bolsters Incredibly Supple Conforms To Fit Curves Firm Gentle Support Piece 1 Core Peak Bolsters, Core Peak Bolster Peaked Shape Fits Comfortably Under Your Knees Precision-cut Foam 10" X 24", With 7" Peak Available In Blue, Gray, Or Black Piece 1 Mobilization Belts And Devices Features: Long Enough To Meet Your Needs: The Strap Belt For Mobilization Measures About 8.2 Feet Long, Enough To Meet Your Using Needs On Leg And Shoulder Stretch, Dancing Training, Yoga, Hop And Waist Support, Arm Movement And So On. Adjustable And Portable: The Yoga Belt With Buckle Comes With An Adjustable Buckle, Allowing You To Adjust The Length Of The Belt To Get A Desired Length, And You Can Easily Carry And Store The Belt, Without Taking Up Too Much Space. Specifications: Main Material: Nylon Color: Blue Size: Approx. 8.2 Feet In Length, About 2 Inches In Width Piece 5 Gait Belt Features: This Transfer Belt Is Designed With A Buckle, Which Can Be Adjusted According To Your Needs Without Worrying About Being Too Loose Or Too Tight. This Gait Belt Metal Buckle Has Reliable Materials, Smooth Surface And Lightweight Structure, Which Is Convenient For Long-term Use And Storage. Specifications: Material: Vinyl Color: Black Size: 60 X 2 Inches Piece 5 Kinesiology Tape, Ultra-strong And Sticky-hypoallergenic Adhesive Water Resistant 97% Cotton, 3% Nylon 180% Stretch For Full Range Of Motion Latex And Zinc Free Sticks 2-7 Days 5-10 Applications Per Roll Each Is 2"x 16.4" (5cmx5cm) Piece 5 Splinting Materials, Rescue Padded Board Splint 6 Paddes Wood Splint (different Sizes) Sizes: 35", 25" And 15" Velcro Straps Color: Blue Set 2 Paraffin Bath, Bath Arm, Hand And Foot Usage: Wax Fomentation Condition: New Voltage: 220v Ac Power:2 Kw Tank Size: 50cm X 35cm X 25cm Deep Unit 1 Dumbells Sets, Product Name: Dumbbell Set Dimension: 810 × 525 × 765mm (excluding Dumbbells) Weight: 37kg Sandbags Qty: 18 Pcs With Different Weight Sandbags Weight: 1lb, 2lbs, 3lbs, 4lbs, 5lbs Type: Medical Rehabilitation Equipment Function: Used For Whole Body Rehabilitation Training Total 18 Dumbbells 1 Lb / Piece, 2 Pieces 2 Lbs / Piece, 4 Pieces 3 Lbs / Piece, 4 Pieces 4 Lbs / Piece, 4 Pieces 5 Lbs / Piece, 4 Pieces Set 1 Theraband, Brand: Theraband Material: Rubber Color: Blue/black Sport Type: Exercise And Fitness/pilates Heavy Set Includes The Fifth And Sixth Of Eight Levels Of Latex Resistance Tubes, Blue, 100%, 5.8 Lbs., 200%, 8.6 Lbs., Black, 100%, 7.3 Lbs., 200%, 10.2 Lbs. Set 4 Goniometers, Protractro Goniometer With 360 Degrees Coverage To Measure Joint And Compare The Changes In Joint Angles Material: Clear Plastic 3 Gonimeter: 12 Inch, 8 Inch And 6 Inch Set 2 Reflex Nuero Hammer, Features: The Pointed Babinski-style Tip At The Base Of The Handle Elicits Superficial Or Cutaneous Responses, Including Plantar And Abdominal Reflexes. Multi-function Double-headed Percussion Hammer For Tapping On Various Parts Of The Patient To Check Nerve Response. Ergonomic Handle Design Make The Percussion Hammers Light And Easier To Use. Weight Balanced Hammer, With Two Soft Rubber Heads, A Large And A Small Hammerhead For Accurate Knocking. Zinc Alloy Comfortable Handle Grip Control, Hammer For High Elastic Pvc Rubber Material: Zinc Alloy + Pvc Color: Black Package Size: 27*11*3.5cm/10.6*4.3*1.3 Inch Package Weight: 140g/4.9oz Piece 2 Thermometer, 1 Second Measuring Time 3 Color Backlight Fever Reminder Auto Shut Off At 18 Seconds Store 50 Sets Of Data Body Temperature Measurement: 34.0-42.9°c / 93.2-109.2°f Surface Temperature Measurement: 0-100°c / 32-212°f Material: Abs Plastic Display Resolution: 0.1°c(0.1°f) Measuring Distance: 1~5cm (0.4~2in) Accuracy: (+/-)0.2°c Auto-shutdown Time: About 18s Power Supply: 2 * 1.5v Aaa Batteries (not Included) 1 Year Warranty Unit 1 Multiple Mode Electrical Stimulator Specification: Dimension: 170 X 60 X 26 (mm) Channel: Two Independent Channels Power Supply: 9v Battery X 1 Pcs Output: 0~100ma P To P Into 500ω Load Density(intensity): Change Of 15 Steps Pulse Amplitude Timer: 30 Minutes Countdown Timer With Auto Off Wave For Dual Phases Square Wave Display: Lcd Display With Timer/mode/density (“density”=intensity) Mode: 10 Programs, P1~p5 Tens, P6~p0 Fitness Ems Ramp Up: 3 Seconds Buzzer: 2 Different Reminders 1.correct: Single Beep 2.caution: Long Beep Pulse Wave Form Low Frequency Stimulator Low Frequency Stimulator Standard Accessories: Electrical Stimulator 1 Stimulator Lead Wire 2 Self Adhering Electrode 4 Operating Manual 1 9v Battery 1 Reusable Package Box 1 Unit 2 Abc = 359,916.00
Closing Soon28 Jan 2025
Tender AmountPHP 359.9 K (USD 6.1 K)

Province Of Ifugao Tender

Civil And Construction...+1Water Storage And Supply
Philippines
Details: Description Republic Of The Philippines Cordillera Administrative Region Provincial Local Government Unit Of Ifugao Bids And Awards Committee 3rd Floor Peo Bldg., Capitol Compound Lagawe, Ifugao Email Ad.: Bacgoodsifugao13@gmail.com Publication No. 01-2025-c (first Publication) Request For Expression Of Interest For Hydro Energy Development: Pre Fs 1. The Plgu-ifugao, Through The Supplemental Budget No. 2 And Supplemental Budget No. 5 For The Contract Approved By The Sanggunian Panlalawigan For Cy 2024 Intends To Apply The Sum Of Four Million Five Hundred Thousand Pesos (php 4,500,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Publication No. 01-2025-c (first Publication). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening Of The Financial Proposals. 2. The Plgu-ifugao Now Calls For The Submission Of Eligibility Documents For The Hydro Energy Development: Pre Fs Project Particularly The Pre-application And Pre-feasibility Study Of The Proposed Alimit Hydro Power Plant. Eligibility Documents Of Interested Consultants Must Be Duly Received By The Bac Secretariat On Or Before 1:00 P.m. Basing On The Bac Office - Wall Clock Of January 30, 2025 At The Bids And Awards Committee Office, 3rd Floor, Peo Bldg., Capitol, Lagawe, Ifugao. Opening Of Eligibility Documents Will Be On 2:00 P.m. Of January 30, 2025 At The Address Stated Above. Applications For Eligibility Will Be Evaluated Based On A Non-discretionary “pass/fail” Criterion. 3. Interested Bidders May Obtain Further Information From The Bids And Awards Committee (bac) Of The Provincial Government Of Ifugao And Inspect The Bidding Documents At The Address Given Below During 8:00 O’clock Am To 5:00 O’clock Pm. 4. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 23, 2025 To February 18, 2025 From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos Only (php 5,000.00). 5. The Bac Shall Draw Up The Short List Of Consultants From Those Who Have Submitted Expression Of Interest, Including The Eligibility Documents, And Have Been Determined As Eligible In Accordance With The Provisions Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”, And Its Implementing Rules And Regulations (irr). The Short List Shall Consist Of Five (5) Prospective Bidders Who Will Be Entitled To Submit Bids. The Criteria And Rating System For Short Listing Are: Applicable Experience Of The Firm (within The Past 10 Years) (30 Points): • Completed Consulting Services Of Size, Complexity And Technical Specialty Comparable (similar/relevant) To The Job Under Consideration, Including Quality Of Performance. • Other Completed Consulting Services Related To The Job Under Consideration • Known Cases Of Prior Performance Including Quality Of Work Conforming To Obligation And Cost Of Services. Qualification Of Officer, Key Organic Personnel To Be Assigned To The Project (50 Points); And Job Capacity (20 Points): • Absorptive Capacity To Do Additional Works Other Than Those Currently Being Undertaken 6. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The Irr Of Ra 9184. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The Irr Of Ra 9184. 7. The Bids Shall Be Evaluated Using The Quality-cost Based Evaluation/selection (qcbe/qcbs) Procedure. The Criteria And Rating System For The Evaluation Of Bids Shall Be Provided In The Instructions To Bidders. 8. The Weight Of The Technical Proposal Shall Be 80% And The Financial Proposal Shall Be 20%. 9. The Contract Shall Be Completed Within One Hundred Twenty (120) Calendar Days, From The Date Of Contract Signing. 10. The Plgu-ifugao Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: The Bac Secretariat Bids And Awards Committee (bac) Office 3rd Floor Peo Building, Capitol Compound, Poblacion South, Lagawe, Ifugao Bacgoodsifugao13@gmail.com 0953-931-6730 Date Of Posting: January 23, 2025 Carmelita B. Buyuccan Bac Chairperson Annex 1 Item No. General Description Qty. Unit Of Issue Unit Cost Total Cost 1 Hydro Energy Development: Pre Fs 1 Lot See Attached Terms Of Reference ***nothing Follows*** Total 4,500,000.00 Prepared By: Eleanor A. Oyami Bac-secretariat Certified Correct: Arundale Gum-u I. Bunnag Bac-secretariat On Goods & Infrastructure Republic Of The Philippines Cordillera Administrative Region Provincial Local Government Unit Of Ifugao Office Of The Provincial Governor Lagawe, Ifugao Terms Of Reference Project Title : Hydro Energy Development: Pre Fs Budget Item Particulars And Cost: Particulars Cost Cost Of Consultancy For The Hydro Energy Development: Pre Fs Project Particularly The Pre-application And Pre-feasibility Study Of The Proposed Alimit Hydro Power Plant. 4,500,000.00 Funding Source: Cy 2024 Supplemental Budget No. 2 Amounting To Php 2,200,000.00 And Cy 2024 Supplemental Budget No. 5 Amounting To Php 4,000,000.00 Prepared By: Reviewed By: Ericson T. Mammag Carmelita B. Buyuccan Provincial Engineer Provincial Project Development Coordinator Approved By: Jerry U. Dalipog Provincial Governor Table Of Contents Part I. Definition Of Terms ………………………………………………………………………………………. 03 Part Ii. Background ………………………………………………………………………………………………….. 04 1. General Background ...……………………………………………………………………………………05 Part Iii. Objective .………………………………………………………...…………………………………………..06 Part Iv. Scope Of Work: ……………….………………………………...............................................06 1. Field Survey ………………………………….………… ……………………………………………………06 2. Office Work ……………………………………………………………………………………………………07 Part V. Submission Of Output And Schedule …………………………………………………………08 1. Complete Package …………………………..................................................................07 2. Effectivity And End Of Consulting Services ………………………………………...…………..07 Part Vi. Qualification Of Consultants ……………………………………………………………..……08 Criteria For Selection …………………………………………………………………………………………….09 Part Vii. Source Of Fund…………………………….……………………………………………………………….10 Part Viii. Consultant’s Services Fee ………………………………………………………...................10 Approved Budget For The Contract……….………………………………..…...………………………..10 Advance Payment …………………………………………………………………………………………………10 Progress Billing ……………………………………………………………………………………………………..11 Part Ix. Data, Local Services And Personnel To Be Provided By Plgu For Critical Advisories…………………….……..................................................................................................11 Part X. Consultant’s Action Requiring Plgu’s Prior Approval ….…………………………11 Part Xi. Settling Of Disputes …………………………………………………………………….....................11 Part Xii. Consultant’s Liability ……………………………………………………………………………………12 Part Xiii. Annexes ……………………………………………………………………………………………………………12 1. Annex “a”- Criteria For Short Listing……..……………………………………………………12 2. Annex “b” - Certificate Of Availability Of Fund …………………….………………………13 3. Annex “c”- Approved Budget For The Contract …………………………………………..14 Part Xiv. Forms ………………………………………………………………………………………………….…..........15 1. Pf-1: Format Of Curriculum Vitae Of Consultants ………………………………………........15 2. Pf-2: Financial Proposal Form ………………………………………………………………….. ……..16 3. Pf-3: Form Of Contract Agreement ……………………………………………………………………17 4. Pf-4: Omnibus Sworn Statement Form ………………………………………………………………18 Part I Definition Of Terms For Purposes Of This Clause, The Bold Text Is Used To Identify The Defined Terms. 1. Denr – Department Of Environment And Natural Resources 2. Doe – Department Of Energy 3. Ncip – National Commission On Indigenous People 4. Nwrb – National Water Resource Board 5. Plgu - Provincial Local Government Unit Of Ifugao. 6. Sps - Special Project Section At The Provincial Governor’s Office. 7. Pgo - Provincial Governor’s Office. 8. Peo - Provincial Engineering Office. 9. Terms Of Reference (tor) - Refers To These Guidelines Governing The Delivery Of The Pre-application Requirements Of The Construction Of Alimit Hydro Power Plant. 10. Consultant - Is The Consultancy Services Entity Represented By The Manager Whose Proposal Has Been Accepted By The Plgu And To Whom The Contract To Provide The Consultancy Services Was Awarded. 11. Consulting Services – Refers To Services For Infrastructure Projects Or Activities Of The Provincial Local Government Of Ifugao Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Plgu To Undertake Such As Development Of Hydro Power Plants. 12. Contract - Is The Agreement Between Plgu And The Consultant To Execute And Provide The Pre-application And Pre-feasibility Study Requirements Of The Construction Of Alimit Hydro Power Plant. 13. Contract Price - Is The Consultant’s Fee Stated In The Letter Of Acceptance And Thereafter To Be Paid By The Plgu To The Consultant For The Provision Of The Consultancy Services In Accordance With This Contract. 14. Plgu’s Representative - Refers To The Local Chief Executive Or Provincial Governor. 15. Plgu Engineer - Refers To The Provincial Engineer. 16. Re – Renewable Energy Part Ii Background 1. General Background It Has Long Been The Dream Of The People Of Ifugao For A Stable Power Supply To Improve The Delivery Of Government Services, Spur Industrialization And Economic Progress. The Proposed Construction Of Alimit Hydro Power Plant Will Harness The Existing Natural Water Resources Of The Province To Generate Electric Power And Facilitate Or Contribute In The Energization Of The Remaining 4,824 Households Without Power Amongst Ifugao’s And Provide A Stable Power Supply To The Local Industries, Manufacturers, Government And Private Institutions And Generate Additional Income To Finance The Different Programs, Projects And Activities Of The Provincial Government (plgu) Of Ifugao. The Plgu Is About 90% Dependent On The National Tax Allocation (nta) Hence The Need To Increase The Local Revenue. The Pre-application Requirement For The Processing Of The Applications For Renewable Energy Service Contract Is Very New To The Plgu Hence This Project Proposal For Consultancy To Engage Consultants Who Are Experts In The Preparation Of The Requirement Including The Pre-feasibility Study. This Terms Of Reference (tor) Covers The Preparation Of The Pre-application Documents Such As Topographic Survey To Ascertain The Location And Orientation Of The Project And As Basis Of The Area Clearance By The Department Of Energy. The Consultant Or Consultants Shall Also Submit A Pre-feasibility Study Based On Primary And Secondary Data To Check Whether The Proposal Is Worth Pursuing For The Comprehensive Feasibility Study Preparation And Detailed Technical Study With Engineering Design. The Study Includes The Submission And Application Of The Following To The Doe: Pre-application Requirements: A. Legal I) Original Copy Of Sp Resolution Approving The Proposed Project And Authorizing Its Representative To Negotiate And Enter Into Renewable Energy (re) Contract With Doe; Ii) Certified True Copy Of Passport Id Or Any Valid Government Issued Id Of The Authorized Representatives, I.e., Signatory And Witness Under The Re Contract. B. Technical I) Digital And Four (4) Print Copies In 8.5”x13” Bond Paper Of The Work Program In Gantt Chart Following The Approved Template Of The Doe; Ii) Digital And Print Copy Of Proposed Re Project Site/area Location Map And Technical Description As Verified By Doe Itms; Iii) Letter Signifying Intent To Pursue The Application Subject To Compliance With The Requirements Of Ra 11038 (expanded Nipas Of 2018) And Eo No. 23 Being Administered By The Department Of Environment And Natural Resources (denr). The Environmental Compliance Certificate (ecc)/environmental Impact Assessment (eia), Ncip Certification Precondition With Pre-field Base Investigation, Field Base Investigation, Free And Prior Inform Consent (fpic) And Water Permit And Water Sustainability Plan From The National Water Resource Board (nwrb) Are Some Of The Documents To Be Submitted To Form Part Of The Pre-feasibility Study. C. Financial I) Original Copy Or Certified True Copy Of The Latest Annual Report And/or Audited Financial Statements (fs) For The Last Two (2) Years From The Filing Date And Latest Unaudited Fs Duly Signed By The Responsible Official Such As The Chief Finance Officer If The Audited Fs Is More Than Six (6) Months Old At The Time Of Filing; Ii) Bank Certification To Substantiate The Cash Balance In The Audited Fs Or Unaudited Fs. Iii) Projected Cash Flow Statement For The Next Five (5) Years Showing The Fund Sources And Uses Of Funds For The Particular Offered Area, Other Applied Re Areas, Existing Service/operating Contracts With Doe And Other Existing Business With Support From Any Bank Approved Loan/credit Line Earmarked For The Proposed Operation. D. Lgu Endorsement – Barangay And Municipal. Pre-feasibility Study Requirements: A. Topographic Study – Submission Of A Namria Scaled Topographic Map Showing The Appropriate Location Of The Power Plant System. B. Hydrological Study – Submission Of A Hydrology Cycle Based On Actual Site Data And Historical Data From Government Agencies Like Pag-asa, Nia And Dpwh-brs. Determination Of The Minimum And Maximum River Flow Of Tributaries, Design Discharge, Net Head And Projected Annual Generation. C. Geological Study – Submission Of Site Geologic And Geohazard Assessment (ie. Earthquake, Erosion). Determine Rock Characteristics From At Least One Bored Hole At The River Bank Along The Proposed Dam Axis And Its Soil Bearing Capacity. D. Power/market Study – Submission Of Power/market Study To Establish The Supply And Demand Analysis, Generation And Production Cost. E. Benefit Cost Ratio And Economic Internal Rate Of Return (eirr) – Submission Of The Bcr And Eirr Run. F. Social And Environmental Study – Submission Of Environmental Compliance Certificate (ecc)/environmental Impact Assessment (eia), Ncip Certification Precondition With Pre-field Base Investigation, Field Base Investigation, Free And Prior Inform Consent (fpic) And Water Permit And Water Sustainability Plan From The National Water Resource Board (nwrb). G. Preliminary Civil Works And Electro-mechanical Works – Submission Of Technical Description Of The Project And Initial Design Of The Structures And Technical Drawings. Access Road Alignment, Transmission Line Alignment, Dam, Penstock, And Power House Layout And Electro-mechanical Specifications. H. Preliminary Project Cost Estimates – Submission Of Unit Price Analysis And Program Of Work. Part Iii Objective 2. The Primary Objective Of The Engagement Of The Consultant/s Is To Hasten The Preparation Of The Pre-application Requirements For The Processing Of Applications For Renewable Energy Service Contract So That Plgu Ifugao Will Be Awarded The Prior Rights To Develop The Site For A Hydro Power Plant Over Private Developers. 2. The Secondary Objective Is To Augment The Lack Of Expertise Amongst The Plgu Staff Re: Renewable Energy Project Development And Ensure That Proper Guidance Is Provided To Management Whether To Proceed With The Comprehensive Feasibility Study And Detailed Engineering Design. Part Iv Scope Of Work 1. Field Survey – This Activity Will Be Conducted On Site To Gather Information Needed In The Submission Of Documents And Other Requirements For Pre-application And Pre-feasibility Study Such As Preparation Of: A. Letter Of Intent (loi); B. Letter Of Authority Or Board Resolution; C. Location Map; D. Area Clearance; E. Doe Orientation. The Following Activities Are: A. Travel And Courtesy Call To The Governor With Plgu Officials; B. Meeting And Consultation With The Municipal And Barangay Officials And Project Affected Persons; C. Reconnaissance And Topographic Survey; D. Measurement Of Flow, Head And Hydropower Layout; E. Rock Sampling And Geologic Assessment; F. Identification And Inventory Of Social And Environmental Issues; G. Finalize Measurement And Wrapping Up All Surveys; H. Travel And Feedback To The Governor With Plgu Officials. 2. Office Work – This Activity Is The Preparation And Packaging Of The Requirement For Pre-application To The Department Of Energy Prescribed Under Ra 11234- Energy Virtual One-stop Shop Act (evos) And Preliminary Feasibility Study Indicating Whether The Construction Of Alimit Hydro Power Plant Is Worth Pursuing. The Pre-application Should Contain The Legal, Technical And Financial Requirements For The Renewable Energy Service Contracting And Packaging With The Following Pre-feasibility Topic Content Or As Maybe Agreed Upon Engagement: A. Project Proposal – Two To Three Paragraphs Describing The Proposed Construction Of Alimit Hydro Power Plant; B. Executive Summary And Salient Features – The Executive Summary Contains In A Nutshell The Result Of The Study Anchored On The Viability Indicators Such As Social And Environmental, Technical, Market And Economic Parameters. The Salient Features Describes The Characteristics Of The River Source, Discharge, The Available Head, The Projected Hydro Power Plant Capacity, The Project Components (diversion Weir, Power Tunnel, Surge Tank, Penstock, Power House, Out-door Switch Yard And Power Evacuation Line). The Location Of The Project (latitude/longitude), Access Road, Surge Shaft, Penstock, Power House, Turbine And Generator, Power Evacuation And Average Annual Generation; C. Geology – The Rock Profile (type, Characteristics, Bearing Capacity) And Hazard Study Especially Earthquake Intensity Requirement Of The Dam, Power House And Critical Structures; D. Hydrology – Describe The River System, Catchment Area, Historical Rainfall Data And Design River Discharge; E. Estimated Annual Power Generation – Based On Records For At Least Not Less Than 30 Years From January To December; F. Location Sketch – Showing The Different Components Of Hydro Power Plant Overlayed In Google And Topographic Map; G. Social And Environmental Impact Assessment – Describes The Social And Environmental Issues And Mitigating Measures, Social Acceptability And Right Of Way (row) Documentation; H. Power And Market Study – Describes The Current Condition Of The Power Supply In Ifugao And The Desired Demand For A Stable And Affordable Power Supply. I. Ball Park Cost Estimate – Contains The Following As Maybe Applicable: Pre-engineering Cost, Pre-development And Pre-installation Cost, Main Diversion Weir, Power Tunnelling And Civil Works, Surge Shaft, Penstock Civil Works, Power House, Switch Yard, Electrical And Mechanical Packages, Transmission Line, Access Roads, Social Development Expenses, Administrative And Project Management Expenses, Consultancy Fees, Contingency And Taxes. J. Organizational Analysis And Economic/financial Analysis – The Organizational Analysis Spells-out The Appropriate Organizational Structure To Manage The Hydropower Plant Whether In-house Or Out-source Or Hybrid. The Economic/financial Analysis Considers The Capital Cost Against The Potential Value Of The Electricity Generated Per Annum To Determine The Payback Period, Return On Investment Or Determination Of The Economic Internal Rate Of Return As Maybe Appropriate; K. Construction Schedule – To Be Presented In A Bar Chart From Survey And Site Investigation, Design And Preparation Of Detailed Engineering Design (ded), Approval Of Ded And Securing Statutory Clearances, Construction Of The Different Structures And Facilities, Designing-manufacturing-testing-acceptance Of Electrical And Mechanical (e&m) Equipment, Commissioning, Test Run Of The Project, And Commercial Operation Declaration; L. Technical Specification Of Electrical And Mechanical Packages – The Prospective Source Of Materials And Specifications. Part V Submission Of Output And Schedule 1. Complete Package Of The Pre-application Requirement And Pre-feasibility Study To Be Submitted In Hard Copies (3 Copies) And Electronic Copy Saved In Active And Pdf File. 2. Effectivity And End Of Consultancy Services The Consultancy Services Shall Be Effective Upon Signing And Notarization Of The Consultancy Service Contract. The Submission Of Final Output Is After 120 Calendar Days From Contract Signing And Terminates Upon The Issuance Of The Certificate Of Completion And Acceptance By The Implementing Agency Through A Group Of Reviewers From The Legal, Technical, Financial, Administrative Departments And Sanguniang Panlalawigan Of The Plgu. The Review, Compliance And Acceptance Period Will Take Another 30 Calendar Days Including The Approval Of The Head Of The Procuring Entity. Part Vi Qualification Of Consultant/s Consultant/s May Be Any Natural Or Juridical, Local Individual Or Company With Valid Business Permit And Other Documentary Requirements As Specified In The Revised Implementing Rules And Regulations Of Ra 9184 Which Shall Be Defined In The Bidding Documents For The Project. If The Participating Consultant/s Involves A Joint Venture Or Consortium, The Partners Of The Joint Venture (jv) Shall Organize And Create A Corporation Duly Registered Under The Corporation Code Of The Philippines. Further, The Jv Company Shall State The Following In The Bid Proposal: A. Name Of The Partners In The Joint Venture Or Consortium. B. Participation Interest Of Each Partner. Participating Bidder Must Possess The Necessary Technical Capabilities In Terms Of The Following: A. Track Record/experience In Similar Project Or Undertaking Within The Last Ten (10) Years From The Submission And Opening Of Quotations; B. Work Program Containing The Minimum Requirements Of The Project Including The Manpower And Man-days For The Conduct Of Study; C. Curriculum Vitae Of The Management And Technical Personnel; D. List Of Third-party Consultants With Corresponding Service Contract/agreement Showing Their Respective Qualifications. Professional Staff - The Consultant/s Shall In The Delivery Of The Foregoing Services Must Employ The Following Professionals Specified Below: Qualifications And Work Experiences Of Consultant’s Study Team Designation Profession Experience 1 Team Leader Degree In Electrical Or Mechanical Engineering Or Hydro Power Engineering Related Courses At Least 5 Years Relevant Experience 2 Hydrologist Degree Or Diploma And Experienced In Water Resources Engineering At Least 3 Years Relevant Experience 3 Surveyor/ Topographer Geodetic Engineer At Least 3 Years Relevant Experience 4 Civil Engineer Degree In Civil Engineering At Least 5 Years Relevant Experience 5 Geologist Degree In Geology/geotechnical Engineering At Least 3 Years Relevant Experience 6 Driver Experience In Off-road Driving At Least 3 Years Relevant Experience 7 Administrative Staff/survey Crew Degree Holder With Experience In Liaising, Proposal Packaging, Experience In Surveying At Least 1 Year Relevant Experience 8 Environmental Impact Assessment (eia) Preparer Degree In Social Or Environmental Science At Least 3 Years Relevant Experience 9 Social Impact Assessment (sia) Preparer Degree In Social Or Environmental Science At Least 3 Years Relevant Experience Criteria For Selection 1. Prospective Consulting Firm Will Be Shortlisted Based On The Criteria Shown In Annex A (“criteria For Shortlisting”) And As Summarized Below: 1.1. Applicable Experience Of The Firm (within The Past 10 Years); 1.2. Qualification Of Officer, Key Organic Personnel Who May Be Assigned To The Project (in Case Of Nominated Personnel Who Are Not Officers Or Organic Staff, A Notarized Letter Of Commitment For Each Personnel Should Be Submitted); And 1.3. Job Capacity 2. The Consulting Firm Shall Be Selected Using The Quality-cost Based Selection/evaluation (qcbs/qcbe) Procedure Under Republic Act (ra) No. 9184, Rules And Regulation (irr) And Based On The Following Criteria: 2.1. Technical Proposal : 80% 2.2. Financial Proposal : 20% Part Vii Source Of Fund Funds For The Preparation Of Pre-application And Pre-feasibility Study For The Construction Of Alimit Hydro Power Plant Will Be Sourced From The Cy 2024 Supplemental Budget No. 2 Amounting To Php 2,200,000.0 And Cy 2024 General Fund-other Development Fund Amounting To Php 4,000,000.00. Part Viii Consultancy Services Fee 1. The Fee For The Consultancy Service Is Inclusive Of Remuneration Cost (basic Salary, Social Charge, Overhead, Management Fee), Reimbursable Cost, Miscellaneous, Contingency, And Taxes. This Shall Also Be The Basis In Establishing The Approved Budget For The Contract (abc). Approved Budget For The Contract (abc) The Approved Budget For The Contract (abc) Is Four Million Five Hundred Thousand Pesos (php 4,500,000.00) With Details In Annex “c”. No. Item Cost I Remuneration Costs 2,604,481.53 Ii Reimbursable Costs 1,165,000.00 Iii Miscellaneous Expenses 72,375.97 Iv Sub-total (i+ii+iii) 3,841,857.50 V Vat (12% Of Remuneration) 312,549.78 Vi Contingency (8.99% Of Iv) 345,592.72 Vii Grand Total ( Iv+v+vi) 4,500,000.00 2. In All Billing Transactions, The Fee Shall Be Deposited Directly To The Consultant’s Bank Account. In This Connection, The Consultant Shall Provide The Name Of The Bank, Account Name, And Account Number. Advance Payment: I. The Consultant Shall Be Entitled To Fifteen Percent (15%) Advance Payment Upon The Effectivity Of Its Contract And Submission Of The Inception Report Which Shall Be Released In Lumpsum Amount; Ii. The Advance Payment Shall Be Recouped By Deducting In Every Progress Billing Using The Same Percentage Of The Progress Billing For The Deduction. Progress Billing: I) Consultant’s Progress Billing Shall Be Administered Twice With The First Billing At 40% Upon Submission And Application To Doe Of The Requirement For Pre-application Such As The Topographic Map, Legal, Technical And Financial Documents. The Last Billing Shall Be Processed Upon Submission Of The Packaged Pre-feasibility Study Containing The Items Under The Pre-feasibility Study Requirements Or 100% Physical Progress With Issued Certificate Of Completion And Acceptance. Ii) Billing For The Reimbursable Items May Be Requested During Progress Billing Based On Actual Expenses Incurred And Supported By Official Receipts/documents. In The Absence Of Official Receipts/documents, The Firm May Also Be Allowed To Submit A Certification Of Actual Disbursements Made Under Oath. Part Ix Data, Local Services And Personnel To Be Provided By The Plgu For Critical Advisories 1. Plgu Warrants The Availability Of Funds; 2. Plgu Shall Provide All Contract Documents To The Consulting Firm; 3. Plgu Shall Provide Focal Persons From Plo For Legal Review, Peo For Technical Review, Ppdo For Project Development And Pre-fs Evaluation Review, Pto With Sanguniang Panlalawigan (sp) For The Financial Viability Review And Administrator’s Office For The Hydro Power Organizational Structure Review Of The Project In The Contract. Part X Consultant’s Action Requiring Plgu’s Prior Approval Replacement Of Technical Personnel By The Consultant Must Have The Prior Approval Of Plgu. Plgu Will Approve The Replacement, If The Qualifications Of The Substitute Professional Equals Or Surpasses That Of The Professional Staff To Be Replaced. Part Xi Settling Of Disputes Any Dispute Arising From The Delivery Of The Contract For The Consultancy Services Shall Be Settled Amicably By Both Parties. During The Entire Negotiations, The Plgu Shall Be Represented By The Plgu Legal Officer While The Consultant Shall Be Represented By The General Manager/project Manager. Should The Two Parties Fail To Settle Their Dispute Amicably, The Dispute Shall Be Referred To The Dole Ifugao Provincial Office Or Other Appropriate Entity As Agreed By The Contracting Party. Part Xii Consultant’s Liability The Consultant’s Liability Under This Contract Shall Be Provided/governed By Applicable Laws Of The Republic Of The Philippines (i.e. Ra 9184). Part Xiii Annexes Annex “a” Criteria For Shortlisting Rating Factor Points/weight Applicable Experience Of The Firm (within The Past 10 Years) • Completed Consulting Services Of Size, Complexity And Technical Specialty Comparable (similar/relevant) To The Job Under Consideration, Including Quality Of Performance. • Other Completed Consulting Services Related To The Job Under Consideration • Known Cases Of Prior Performance Including Quality Of Work Conforming To Obligation And Cost Of Services. 30 Qualification Of Officer, Key Organic Personnel To Be Assigned To The Project 50 Job Capacity • Absorptive Capacity To Do Additional Works Other Than Those Currently Being Undertaken 20 Note: Similar Projects Refer To Contracts With Scope Of Works Covering The Doe Pre-application For Re Service Contract, Conduct Of Pre-feasibility Study Or Comprehensive Feasibility Study Of Hydropower Plant. Relevant Projects Are Pre-fs And Fs, Detailed Engineering, Or Advisory Services Conducted For Water Resource-related And Power Facilities Related Projects; Detailed Engineering, Advisory Services, Or Components Of An Fs (demand Forecast, Economic, Financial) For Hydropower Project And Construction, Supervision, Civil Works Or Operation And Maintenance Of Projects Pertaining To Hydropower Project. Annex “b” Certificate Of Availability Of Fund Republic Of The Philppines Provincial Local Government Of Ifugao Lagawe, Ifugao Date: Certification To Whom It May Concern: This Is To Certify That The Amount Of Four Million Five Hundred Thousand Pesos (php 4,500,000.00 ) Philippine Currency Is Available For Expenditure For The Hydro Energy Development: Pre Fs. Payment Of The Consultancy Services For The Pre-application And Pre-feasibility Study Of The Construction Of Alimit Hydro Power Plant. At Barangay Alimit , Municipality Of Mayoyao , Province Of Ifugao. Charge To: Cy 2024 Supplemental Budget No. 2 And Cy 2024 Supplemental Budget No. 5 Appropriation Available: Allotment Available: Funds Available: Virgilio T. Marquez Charles P. Baguilat Martha U. Ballangi Provincial Budget Officer Provincial Accountant Oic. Provincial Treasurer Approved By: Jerry U. Dalipog Provincial Governor Annex “c” Approved Budget For The Contract Consultancy Services Position Number Of Personnel Man-days Billing Rate Total Cost I. Remuneration Costs 1 Team Leader / Hydro Specialist 1 70 6,674.15 467,190.53 2 Hydrologist 1 46 6,663.33 306,513.18 3 Surveyor / Topographer 1 54 3,601.71 194,492.12 4 Civil Engineer 1 70 4,140.00 289,800.00 5 Geologist 1 36 3,857.73 138,878.18 6 Environmental Impact Assessment (eia) Preparer 2 184 2,666.91 490,711.94 7 Social Impact Assessment (sia) Preparer 2 184 2,666.91 490,711.94 8 Driver 1 20 1,018.18 20,363.64 9 Administrative Staff (ao 2)/survey Crew 2 & 6 156 1,320.00 205,920.00 Sub-total 2,604,581.53 Ii. Reimbursable Costs Description Unit Quantity Unit Price Total Cost 8 Per Diem – Php 2,000 Per Man-day Man-days 400 2,000.00 800,000.00 9 Fuel For Vehicles Ls 95,000.00 10 Cost Of Field Office Rental And Office Supplies Ls 200,000.00 11 Cost Of Tools And Equipment Or Rental Ls 70,000.00 Sub-total 1,165,000.00 Iii. Miscellaneous Description Unit Quantity Unit Price Total Cost 12 Cost Of Meetings/consultations/investigations/research Ls 72,375.97 Sub-total 72,375.97 13 Vat (12% Of Remuneration Cost) Ls 312,549.78 14 Contingency 10% Of (i+ii+iii) Ls 345,592.72 Total 4,500,000.00 Part Xiv Forms Pf-1. Format Of Curriculum Vitae (cv) For Proposed Consultancy Proposed Position: ________ Name Of Firm: Name Of Staff: Profession: Date Of Birth: ________________ Years With Firm/entity: ______ Nationality: Membership In Professional Societies: Detailed Tasks Assigned: Key Qualifications: [give An Outline Of Staff Member’s Experience And Training Most Pertinent To Tasks At Hand. Describe Degree Of Responsibility Held By Staff Member On Relevant Previous Projects And Give Dates And Locations.] Education: [summarize College/university And Other Specialized Education Of Staff Members, Giving Names Of Schools, Dates Attended, And Degrees Obtained.] Employment Record: [starting With Present Position, List In Reverse Order Every Employment Held. List All Positions Held By Staff Member Since Graduation, Giving Dates, Names Of Employing Organizations, Titles Of Positions Held, And Locations Of Projects. For Experience In Last Ten Years, Also Give Types Of Activities Performed And Client References, Where Appropriate.] Languages: [for Each Language, Indicate Proficiency: Excellent, Good, Fair, Or Poor In Speaking, Reading, And Writing.] Certification: I, The Undersigned, Certify To The Best Of My Knowledge And Belief, These Data Correctly Describe Me, My Qualifications, And My Experience. Date: [signature Of Staff Member Of The Firm] (day/month/year) ___________________________________________________________ (full Name Of Staff Member) Pf-2. Financial Proposal Submission Form [date] The Chairperson Bids And Awards Committee Provincial Local Government Unit Of Ifugao Poblacion South, Lagawe, Ifugao Madam: We, The Undersigned, Offer To Provide The Consulting Services For The Hydro Energy Development: Pre Fs Project Particularly The Pre-application And Pre-fs Of The Construction Of Alimit Hydro Power Plant In Accordance With Your Terms Of Reference (tor) Dated (insert Date). Our Financial Proposal Is For The Sum Of [amount In Words And Figures]. This Amount Is Inclusive Of The Basic Salaries, Social Charges, Overhead, Management Fee, Reimbursable Cost (per Diems, Transportation Expenses, Office Supplies, Cost Of Tools And Equipment), Miscellaneous, Contingencies, And Tax Expenses. Our Financial Proposal Shall Be Binding Upon Us Subject To The Modifications Resulting From Contract Negotiations, Up To The Date Of Award. In Accordance With Clause 4 Of The Omnibus Sworn Statement, We Acknowledge And Accept Plgu’s Right To Inspect And Audit All Records Relating To Our Proposal Irrespective Of Whether We Enter Into A Contract With Plgu As A Result Of This Proposal. We Confirm That We Have Read, Understood And Accepted The Contents Of The Terms Of Reference (tor), The Provisions Relating To The Eligibility Of Consultant’s Technical Staff And The Applicable Guidelines Of The Procurement Rules Of The Plgu, Any And All Supplemental Bulletins Issued And Other Attachments And Inclusions In The Terms Of Reference (tor) Sent To Us. We Understand That Our Financial Proposal Is Fixed Which Shall Not Be Adjusted Regardless Of Whether The Contract Actual Duration Of The Consultancy Contract Package Varies From The Original Contract Duration And That You Are Not Bound To Accept Any Proposal You Receive. Yours Sincerely, Authorized Signature : Name And Title Of Signatory : Name Of Firm : Address : Pf 3. Form Of Contract Agreement This Agreement, Made This _______ Day Of _____________, 2024 Between The Provincial Local Government Unit Of Ifugao (plgu) Hereinafter Called The “entity” And ____________________________ Hereinafter Called The “consultant”. Whereas, The Entity Is Desirous That The Consultant Execute The Consultancy Services Provided In The Tor Hereinafter Called “the Services” And The Entity Has Accepted The Price Proposal For _______________________________________________________________ (php ____________________ ) By The Consultant For The Execution Of The Consultancy Services For The Doe Pre-application And Pre-feasibility Study Of The Construction Of Alimit Hydro Power Plant. Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Terms Of Reference (tor) Hereinafter Referred To. 2. The Following Documents Shall Be Attached, Deemed To Form, And Be Read And Construed As Part Of This Agreement, To Wit: (a) Terms Of Reference (tor); (b) Annexes; (c) Forms; (d) Financial Proposal; (e) Bids And Awards Committee (bac) Resolution Of Award Of Contract And The Consultant’s Conforme Thereto. 3. In Consideration Of The Payments To Be Made By Plgu To The Consultant As Hereinafter Mentioned, The Consultant Hereby Covenants With Plgu To Execute And Complete The Consulting Services In Conformity With The Provisions Of This Contract In All Respects. 4. Plgu Hereby Covenants To Pay The Consultant In Consideration Of The Execution And Completion Of The Consultancy Services For The Pre-application And Pre-feasibility Study Of The Construction Of Alimit Hydro Power Plant, The Contract Price Or Such Other Sum As May Become Payable Under The Provisions Of This Contract At The Time And In The Manner Prescribed By This Contract. In Witness Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Binding Signature Of Owner (plgu) Binding Signature Of Consultant _______________________________________ ____________________________ [addendum Showing The Corrections, If Any, Made During The Proposal Evaluation Should Be Attached With This Agreement] P F 4. Omnibus Sworn Statement Republic Of The Philippines ) City/municipality Of Lagawe) S.s. Affidavit I, ___________________________, Of Legal Age, Married, Filipino, And Residing At _________________________________________________, After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. I Am The Owner And Sole Proprietor Of __________________________________ With Office Address At _____________________________________________; As The Owner And Sole Proprietor Of _______________________________, I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Represent It In The Proposal For The Consultancy Services For The Pre-application And Pre-feasibility Study Of The Construction Of Alimit Hydro Power Plant For The Project/s Of Ifugao Plgu. 2._________________________________ Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board; 3. ___________________________________ Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 5. I Am Not Related To The Local Chief Executive (lce) Of Plgu, Members Of The Bac Including The Technical Working Group (twg), The Technical Professionals Who Assisted/drafted The Tor, And The Bac Secretariat By Consanguinity Or Affinity Up To The Third Civil Degree; 6. _____________________________________ Complies With Existing Labor Laws And Standards; And 7. _____________________________________ Is Aware Of And Has Undertaken The Following Responsibilities Of The Service Provider: (a) Carefully Examined The Terms Of Reference (tor); (b) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Service Contract; (c) Made An Estimate Of The Facilities Available And Needed For The Service Contract, If Any; And (d) Inquire Or Secure Supplemental Bulletin(s) Issued For The Consultancy Services For The Topographic Survey And Pre-feasibility Study Of The Construction Of Alimit Hydro Power Plant. In Witness Whereof, I Have Hereunto Set My Hand This ____ Day Of _________________, 20____at Lagawe, Ifugao, Philippines. __________________________________________________________ [consultant’s Name And Signature]
Closing Date18 Feb 2025
Tender AmountPHP 4.5 Million (USD 76.8 K)

Municipality Of Itogon, Benguet Tender

Others
Corrigendum : Closing Date Modified
Philippines
Details: Description Lot 1 - Groceries - Abc : Php1,619,738.50 Item No. Quantity Unit Of Issue Item Description 1 643 Kg All Purpose Flour (1kg) 2 12 Kg Baking Powder (1kg) 3 240 Packs Burger Bun (6pcs/pack) 4 519 Packs Burger Patties (6pcs/container-228g) 5 87 Packs Cheese (22 Slices/pack) 6 46 Packs Chicken Nuggets Star Shape (200g/pack) 7 20 Kg Chicken Quarter Leg (/kg) 8 133 Packs Chicken Whole / Pack 9 8 Packs Cocoa Powder (500g) 10 185 Cans Condensed Creamer (390g) 11 51 Gallon Cooking Oil (4 L/gallon) 12 53 Packs Corn Starch (1kg/pack) 13 6 Packs Dry Yeast (800g) 14 99 Trays Egg (m-30pcs/tray) 15 149 Cans Evaporated Milk (370ml) 16 364 Packs Fishball (1kg/pack) 17 105 Packs French Fries (450g) 18 20 Packs Fresh Gata (200ml) 19 143 Kg Glutinous Rice (1kg) 20 366 Packs Hotdog - Cheese Flavor (250g/pack) 21 360 Packs Hotdog - Regular (250g/pack) 22 73 Packs Jumbo Siopao (10pcs/pack) 23 18 Gallon Ketchup (4 L/gallon 24 368 Packs Kikiam (500g/pack) 25 152 Packs Longganisa Skinless (450g/pack) 26 324 Packs Longganisa Smoked (225g/pack) 27 7 Kg Margarine Classic (1kg) 28 18 Gallon Mayonaise (3.5 L/gallon) 29 20 Kg Pork Meat (/kg) 30 10 Kg Pork Meat Grind (1kg) 31 25 Packs Pork Siomai Japanese (30pcs/pack) 32 371 Packs Pork Siomai Yellow (30pcs/pack) 33 212 Packs Pork Tocino (450g/pack) 34 100 Kg Raw Peanut /kg (for Peanut Butter Making) 35 180 Packs Shanghai (15pcs/pack) 36 519 Sacks Special Commercial Rice (25kg/sack) 37 35 Sack Sugar - Washed (25kg/sack) 38 35 Kg Sugar Brown (1kg) 39 11 Sacks Sugar White- Refined (25kg/sack) 40 238 Packs Sweet Ham (220g/pack) 41 7 Packs Whip Cream Powder (500g) 42 30 Sets (100 Pcs) 12 Oz Buko Cup Set, Printed White Plastic Cup With Lid And Sealer 43 1 Set 144 Pcs High Quality Puto Molder Multicolor Baking Tools For Puto Kutchinta Assorted Medium 44 1 Pcs 22cm Sifter For Baking Premium Quality Fine Mesh Stainless Steel Strainers With Wide Resting Ear Design - Strainer Wire Mesh - Fine Mesh Strainers 45 1 Set 236pcs Cake Kit With Decoration Icing Nozzle Set Pastry Bag Spatula Muffins Cupcake Molds Baking Supplies 46 4 Unit 32cm Non-stick Frying Pan 304 Stainless Steel Frying Pan Double Layer Full Mesh Pot Cooker 47 10 Sets 50pcs 8oz/ 232ml/ Small Plastic Peanut Butter Jar 48 2 Unit "makapal Palanggana Wash Basin Stainless Steel Supported Weight 8kg Dimension (l X W X H) 63cmx63cmx16cm" 49 2 Pcs 9 Inches Round Pan 50 10 Packs "aluminum Foil 5meters/8meters Wrap Food Grade Foil Wrapper Sheet Roll" 51 4 Unit Aluminum Frying Pan "kawa" 49cmx42cmx15cm Diameter 52 1 Set Bakeware Sets 10 Piece Non-stick Bakeware Set - Carbon Steel Baking Tray Set, Suitable For Oven, Refrigerator And Freezer 53 9 Pcs Baking Pan, Non Stick, Rectangular, 27.5x18x6cm 54 5 Pcs Stainless Basin 55cm 55 1 Pcs Big Pot, Double Handle Cast Iron Size #1, Big Kawali, Frying Pan Wok 56 1 Pcs "caldero/cauldron Pot Aluminum Double Handle (d1-d5) Size (diameter 34.5cm) Sizes (lxwxh) D1=37.5x34.5x23.5cm" 57 10 Dozen Drinkingware Coffee Mug Brown Coffee Cup 9oz/ 250ml 58 100 Pcs "peanut Butter Jar/ Orange Cup Cannister Condiments Container Large 624 Grams 650ml 22oz" 59 100 Pcs "peanut Butter Jar/ Orange Cup Cannister Condiments Container Medium 454 Grams 473ml 16oz" 60 100 Pcs "peanut Butter Jar/ Orange Cup Cannister Condiments Container Small 227 Grams 234ml 8oz" 61 12 Pcs Pie Pan 12"inch X 1 Inch Height 62 5 Set "plastic Puto Cups/ Baking Cups/ Kutsinta Cups Mold/ Sauce Dish/ Macaroons/ Pichi Pichi/ Soy Sauce Thick Plastic. Good Quality. Random Color Upon Order. 100pcs Per Order Medium #5-6cm" 63 1 Pcs S/s Soup Laddle With Wooden Handle 6oz 64 2 Pcs Special J.kawa 42"-44" 65 4 Pcs Stainless Bowl 55cm 66 1 Set Stainless Steel Measuring Cup Stackable Kitchen Measuring Tool 67 2 Unit Stainless Wok Pan And Non-stick (38cm, 1.6 Kg) 68 2 Set Steel Mixing Bowl Set Of 3 With Capacity Markings Indicator Lot 2: Equipment: Abc - Php1,130,920.00 Item No. Quantity Unit Of Issue Item Description 1 - 19 Unit 11kg Lpg Gas Tank With Content 2 - 1 Unit 2in1 Burger Griller With Deep Fryer (with Free Cooking Kits) 3 - 3 Unit "3 Layer Electric Steamer 9.0l Capacity 1.1l Water Tank Capacity Rapid Steam System Pp Body And Pc Tray See Through Water Window All Removable Parts Are Dishwasher Safe 60-minutes Times Heating And Power Lights Secure Non-slip Feet" 4 - 3 Unit "3.5 Cu.ft. Showcase Chiller 7-level Temperature Control, Double Glass Door Blower Fan, Led Light, Price Tag Shelves 3 Adjustable Coated Wire Shelves Clean Back Design, Fan-cooled System Recessed Handle, Internal & External Lamps Switch, Front Levelling Feet 100w Input Power " 5 - 15 Unit 3in1 Burger Griller With Deep Fryer And Steamer 6 - 1 Pcs 41cm Steamer - 3 Layer Aluminum 7 - 1 Unit "55l Electric Oven Tempered Glass Door Accessories: Bake Tray, Baking Rack, Tray/rack Handle, Rotisserie Stick And Rotisserie Fork Inner Dimension 420x340x290mm" 8 - 1 Unit "5l Electric Stand Mixer Net Weight (kg): 6.6 Kg Gross Weight (packed): 8.25 Kg Net Weight (wxhxd): 420x395x255 Mm (16.54x15.55x10.04in)" 9- 1 Unit 6.8 Cu.ft. Solid Top Chest Freezer/chiller 10 - 3 Unit 6ft. Folding Table 11 - 1 Unit "7 Speed Electric High Grade Super Hand Mixer Pancake/cupcake Batter Dispenser Whisk Chrome Beater Balloon Whisk He-133 *model: He-133 *body Material: Plastic *blade Material: Stainless Steel *rated Wattage: 260 Watts *rated Voltage: 220-240 Volts *gear Position: 7 Speed *rated Frequency: 50/60hz *controls Type: Knob Control *item Dimension Lxwxh: 18 X 6.5 X 12.1 Centimeters" 12 - 1 Unit "90 Liters Capacity Oven 250c Temperature Control 60 Min. Timer With Bell Ring With Convection And Rotisserie Function Inner Light/indicator Lamp Heater Selector Switch Tempered Glass Door Stainless Steel Heating Elements 5 Stages Of Switch Heating And Function Selector Accessories: Bake Tray 52.6 X 36.2 Cm 685x454x426mm Inner Dimension: 515x415x330mm Baking Racks, Tray/rack Handle, Rotisserie Stick And Rotisserie Forks" 13 - 2 Unit "blender 1.5-liter Glass Jar 2 Speed Control With Pulse Function Stainless Steel Blade Overheat Projector On Motor With Safety Lock Powerful Motor For Superior Blender" 14 - 1 Unit "boiler Coffee Maker And Tea Maker Perculator 7.0 Liter Double-layer Stainless Steel Wall Boil Dry Protection Switch Stainless Steel Lid With Lock Internal Water Gauge 1100 Watts" 15 - 1 Unit Cast Iron C40 Single Burner 16 - 1 Unit "chest Freezer 7.0 Cu.ft. Hd Inverter Solid Top *hd Inverter Compressor *dual Function Technology (freezer Or Chiller) *electric Control *galvanized Interior *led Light *roller Feet *recessed Handle With Key Lock *dimension (hxwxd) 85x91x55 Cm" 17 - 1 Unit Commercial Pressure Cooker High Quality 304 Stainless Steel Large Capacity Pressure Cooker 32cm 15 Liters 18 - 2 Unit Digital Weighing Scale 30kg 19 - 1 Unit "donut Maker 16 Hole Machine Double Sided Heating Doughnut Makers Breakfast Machine Hot Cake Waffle Maker Power: 1400w Voltage: 220-240v Plug Type: Eu Plug Power Source: Electric Color: Stainless Steel + Black Heating: Heating On Both Sides Materials: Non-stick Coated" 20 - 2 Unit Electric Oven 23l Heo23r 4 Function 23 Liters 21 - 11 Unit Electric Oven, 90 Liters Capacity, 120 Min Timer W/ Bell Ring 100-250c Temp Control 22 - 29 Unit Fc-06 Adf Chest Freezer 6 Cu.ft., Dual Function-freezer Or Chiller 8-level Frontal Temperature 23 - 1 Unit "food Dehydrator Voltage: 220v Frequency: 10 Layers 50hz Power: 800w Net Weight: 11kg Size: 380 X 400 X 465 Mm Stainless Steel Trays Outer Body Temperature: 30-90 Degress" 24 - 1 Unit Food Steamer Hfs-55 / 3 Level Food Steamer Food Steamer 10.0l Hfs55 25 - 2 Unit "four Layer Glass Box Organizer Display Four Layers, Each With A Height Of 15.25 Cm, A Length Of 61 Cm And A Width Of 23 Cm " 26- 5 Unit "heavy Duty Double Burner Stove G1000max 2 Twin Jet 120mm Black Cast Iron Burner Brass Burner Cap Automatic Piezo Ignition System Gas Power: 5.2 Kw #304 Stainless Steel Body Cast Iron Trivet Unit Dimension: 69.4(w) X 36(d) X 14.5(h) Cm Box Dimension: 75(w) X 46(d) X 17(h) Cm Net Weight: 6.1 Kg Gross Weight: 7.5 Kg" 27 - 10 Unit "heavy Duty Electric Stand Mixer 8-speed Multiple Function Stand Mixer 5-liter Stainless Bowl 600 Watts High-powered Motor Soft Start That Minimizes Splatter With Aluminum Dough Hooks And Beater Guard With Stainless Steel Wire Whisk" 28 - 1 Unit Heavy Duty Ice Crusher Machine 29 - 1 Unit "heavy Duty Rice Cooker 5.6l Irc-560n Teflex Non-stick Coating Pot Stainless Steel Body Cool Touch Handle Pilot Light Indicator 5.6 Liter Capacity Cooks Up To 30 Cups Of Rice Measurements: L48 X W39 X H30.5cm Model: Irc-560n 1950w" 30 - 1 Unit Heavy Duty Single Burner Cast Iron Autmatic Ignition Gas Stove 31 - 1 Unit "heavy Duty Steamer Makapal Matibay Aluminum 3 Layer Steamer Bottom Layer Is The Base 2nd And 3rd Layer Are The Steamer" 32 - 1 Unit "heavy Duty Wet And Dry Grinding Machine Pang Giling (corn, Rice, Coffee, Soyabeans, Peanut) 1.5hp, 220v" 33 - 1 Unit "ice Box Cooler Insulated W/ Free Ice Scoop 45l Material Plastic Volume Capacity 45l" 34 - 1 Unit "microwave Oven 20l Model: P70b20ap-st Voltage: 220v Capacity: 20l Power Source: 230-240v / 50hz/ 700-1200w" 35 - 1 Unit "peanut Butter Machine/ Sesame Sauce Grinder/ Pulping Machine/ Nuts Almond Milk Machine Model: Hr-160y Brand: Meatpro Power: 1.5kw Hz: 60hz Rotation Speed: 1450r/min Voltage: 220v Capacity: 35pkg/h Emery Wheel Diameter: 160mm" 36 - 1 Pcs "square Beach Umbrella 70” Classic Style Durable And Stylish Good Quality Perfect For Outdoor Use Light Weight. Easy To Carry Anywhere Perfect Protection From Sunlight And Rain Easy Set-up" 37 - 1 Unit "standard Double Gas Stove With Free Regulator Stainless Top And Front Double Detachable Top Burner 560mm X 380mm X 125mm" 38 - 2 Unit "steamer 3 Layers Aluminum Measurement: 36cm Diameter, 13cm Height Per Layer" 39 - 1 Unit "vacuum Sealer Machine With Seal Bags And Starter Kit Four Sealing Modes Longer Food Preservation Theory: Temperature Controller Usage: Household Power Type: None Display Size: 2.0-3.9 Inches Color: Silver Materials: Stainless Steel + Abs Shell Seal Length: Max. 30cm Vacuum Pressure:-85 Kpa" 40 - 25 Unit Weighing Scale (20kg) 41 - 3 Unit Weighing Scale 60kg Capacity Lot 3: Agricultural: Abc - Php313,940.00 Item No. Quantity Unit Of Issue Item Description 1 - 7 Sack 14-14-14 Fertilizer (50kg/sack) 2 - 1 Unit "2 In 1 Electrical And Manual Knapsack Sprayer Net Weight (kg): 5.25 Capacity Of Tank: 16l Working Pressure (mpa): 0.15-0.4 Pump: Diaphragm Pump Stroke: 1.4mm Voltage: 12 Nozzle: 1.4mm Battery: 12v / 8ah" 3 - 215 Meters Black Nylon Net (per Meter) 4 - 3 Rolls Gi Wire Gauge #14 5 - 1 Unit Grab Hoe, Heavy Duty, 23cm, Metal Handle 6 - 3 Unit "grass Cutter Gx35; Aircooled; 4 Cycle; Verticle Piston Vlave; Gasoline Engine; 31ml Maximum Output: 1.0/6500; Fuel Used: Gasoline Engine Fuel Tank Capacity (l): 76" 7 - 140 Kg Greenhouse Plastic, .04mil Thickness, Standard Size, Per Kilo 8 - 345 Kg Greenhouse Plastic, .05mil Thickness, Standard Size, Per Kilo 9 - 1 Unit Hand Tiller / Cultivator 7.5 Hp, Gasoline Engine Industrial Rotary Tiller Machine Cultivator Power Weeder With Complete Accessories 10 - 2 Unit Hand Tiller / Cultivator 7hp, Diesel Engine Industrila Rotary Tiller Machine Cultivator Machine 11 - 2 Rolls Rainbow Garden Hose / Water Hose 1/2" X 90m 12 - 8 Rolls Rainbow Garden Hose / Water Hose 3/4" X 60m 13 - 4 Unit Rake With Handle 14 - 1 Unit "rubber Garden Hose 1"" Heavy Duty Garden Hose Braided High Pressure Pvc Water Hose 50 Meters / Roll" 15 - 2 Unit "rubber Garden Hose 1/2"" Heavy Duty Garden Hose Braided High Pressure Pvc Water Hose 90 Meters / Roll" 16 - 2 Sacks Urea 50kg/sack Lot 4: Tarpaulin : Abc -ph9,360.00 Item No. Quantity Unit Of Issue Item Description 1 - 104 Pcs Tarpaulin (2ftx3ft)
Closing Date12 Feb 2025
Tender AmountPHP 3 Million (USD 52.4 K)

Oriental Mindoro Tender

Publishing and Printing
Philippines
Details: Description Republic Of The Philippines Province Of Oriental Mindoro Municipality Of Pinamalayan Office Of The Bids And Awards Committee Invitation To Bid Itb-2025-02 1. The Municipal Government Of Pinamalayan, Oriental Mindoro, Through The Authorized Appropriations Under The General Fund Intend To Apply The Sum Of Two Million Three Hundred Thousand Four Hundred Ninety Nine Pesos Only (2,300,499.00) Being The Approved Budget For The Contract (abc) For The Project “ Procurement Of Office Supplies, Toner And Ink For 1st Qtr. 2025. Attachment Annex A For Technical Specification Shall From Part Of Itb 2025-02 Lot No. Description Amount 1 Regular Office Supplies 1,404,469.00 2 Toner 247,640.00 3 Ink 648,390.00 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. Submission And Receipt Of Bids At Least One (1) Contract Similar To The Project And Whose Value Must Be At Least Fifty Percent (50%) Of The Approved Budget For The Contract (abc). The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly In Section 5, Instruction To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (r.a. 9184), Otherwise Known As The “government Procurement Reform Act”. 4. Bid Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Non-refundable Fee Amounting To Php 5,000.00 For The Bidding Documents. The Invitation To Bid And Bidding Documents May Be Downloaded From The Website Of The Philippine Government Electronic System (philgeps) And Municipal Government Website (www.pinamalayan.gov.ph) 5. The Schedule Of Bidding Activities Shall Be As Follows: Activities Schedule Venue Sale And Issuance Of Bid Documents January 9, 2025,- February 4, 2025 Bac Office Pre Bid Conference January 22, 2025 At 9:00 O’clock In The Morning Bac Office Submission Of Bids February 4, 2025 At 5:00 O’clock In The Afternoon Bac Office Opening Of Bids February 5, 2025 At 9:00 O’clock In The Morning Bac Office Pre Bid Conference Is Open To All Interested Bidders. For Purposes Of Having A Legal Personality To Raise Or Submit Written Queries Or Clarifications In The Pre-bid Conference Relative To The Bid Project, Bidders Must Pay The Non-refundable Fee For The Bidding Documents On Or Before The Date Of The Pre-bid Conference. For The Pre-bid Conference, Bidders Are Encouraged To Send Their Authorized Technical Representatives Or Personnel, Who Are Familiar With The Bid Requirements And Will Prepare The Documents For The Bidder 6. The Eligibility Requirements And Bid Proposal Documents Must Be Sequentially Compiled In Accordance With The Checklist With Index Table And Table Of Contents For Easy Document Review. 7. The Municipal Government Of Pinamalayan Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. The Municipal Government Of Pinamalayan Likewise Assumes No Obligation Whatsoever To Compensate Or Indemnify Any Bidder Or Winning Bidders, As The Case May Be, For Any Expenses Or Loss That Said Party(ies) May Incur In Its Participation In The Pre-bidding And Bidding Process Nor Does It Guarantee That An Award Will Be Made. For Further Information, Please Refer To: Enrique N. Mocling Bac Secretariat Madrid Blvd. Pinamalayan Oriental Mindoro Telephone #: 284-4517 Email Address: Bacpinamalayan@yahoo.com Approved By: Carlito M. Mejico , Cpa, Reb Municipal Assessor Bac Chairperson Date Of Publication: Posted Philgeps : Newspaper : Not Applicable Agency Website : January 9, 2025-february 4, 2025 Posted 3 Conspicuous Places: Mun. Hall Bulletin Board Lobby – January 9, 2025-february 4, 2025 2. Dilg/abc Announcement Wall – January 9, 2025-february 4, 2025 3. Pinamalayan Public Market – January 9, 2025-february 4, 2025 Technical Specs For 1st Qtr. 2025 Item Description Unit Quantity Ballpen Black 0.8 Tt Black Boxes 3 Ballpen Hbw Black Boxes 6 Ballpen Black Flexstick 0.5 (black) Boxes 45 Ballpen Black Flexstick 0.5 (red,purple,green,blue) Boxes 11 Ballpen Pilot Black Boxes 54 Ballpen, Fiber Castle Black,blue And Red Boxes 11 Ballpoint, Ordinary 50 Pcs Tube Black,blue And Red Tube 6 Sign Pen,black Liquid/vio Grip, Hi Techpoint .05 V10 Boxes 33 Sign Pen,black Liquid/g-tech, 0.4 Mm Needle Tip Boxes 14 Sign Pen Liquid/g-tech 0.5mm Needle Tip Black,green,red And Blue Boxes 35 Sign Pen Liquid/gel Ink 0.5mm Needle Tip Black/blue Boxes 10 Sign Pen 0.5 - My Gel Black Boxes 43 Sign Pen My Gel Red, Green & Violet Boxes 7 Sign Pen Hi-tech Point V5 1.0 Black,red & Blue Boxes 14 Sign Pen Black Water & Faded Proof Pigment Ink 0.6mm Boxes 5 Pencil No. 2 Boxes 30 Pencil No. 1 Boxes 12 Mechanical Lead Pencil, Refill Steadler Pcs 5 Highlighter Pcs 60 Highlighter (14 Pcs) Boxes 2 Marker Pentel Pen (black,red & Blue) Pcs 46 Marker Pentel Pen Boxes 6 Marker White Board Black, Blue And Red Pcs 46 Marker White Board Black Boxes 4 Correction Pen Pcs 20 Correction Tape Pcs 89 Correction Tape (ordinary) Pcs 147 Coupon Bond Long S20 Reams 1100 Coupon Bond Short S20 Reams 744 Paper A3, Bond Reams 19 Paper A4, Bond Reams 24 Book Paper Long Reams 213 Book Paper Short Reams 164 Book Paper A4 Reams 3 Colored Bond (assorted) Reams 9 Accounting Folder (long) Pcs 1013 Accounting Folder (long) (100pcs) Boxes 7 Ordinary Folder White (long) Pcs 640 Ordinary Folder White (short) Pcs 127 Looseleaf Folder - Legal Pcs 807 Brown Envelope Long Pcs 611 Brown Envelope Short Pcs 88 Expanding Envelope Long Size Pcs 149 Expanding Envelope With String, Long Pcs 174 Expanding Folder Legal Size Pcs 32 Paper Laid Long Cream/white Packs 5 Paper Laid Short Cream/white Packs 5 Index Card 1/2" Packs 4 Colored Index Card Tubbings Packs 3 Photo Paper A4 Packs 34 Photo Paper Long Packs 8 Acetate Film (long) Reams 3 Vellum Board Long Cream/white Reams 22 Vellum Board Long Cream/white Packs 5 Vellum Board A4 Cream/white Reams 7 Vellum Board Short Cream/white Reams 7 Vellum Board Short Cream/white Packs 4 Special Paper Long 22g Packs 31 Special Paper Short 22g Packs 1 Tracing Roll Paper 36" Pcs 1 Roll Bond Paper 36" Rolls 6 Glossy Roll Paper (220 Gsm) 36" Reams 1 Yellow Paper Pads 24 Yellow Paper Bundle 2 Sticker Paper A4 Packs 28 Arts File Pcs 29 Dtr Pcs 160 Dtr Reams 2 Carbon Paper Reams 3 Carbon Paper Blue Reams 3 Envelope Mailing White Legal Packs 5 Envelope Mailing White Legal Boxes 5 A4 Size Pvc Card Sheet For Id (50 Sheets) Reams 4 Lct Pvc X Mm Long Boxes 2 Lct Pvc X Mm Short Boxes 2 Pvc Clear Binding Cover Long Packs 15 Plastic Envelope, Legal Size Pcs 14 Record Book/logbook (500pp) Red & Black #85 Pcs 15 Record Book, #45, 200 Pages Pcs 30 Record Book , #99, 300 Pages Pcs 17 Record Book #99, 500 Pages Pcs 9 Record Book, #85, 300 Pages Pcs 29 Record Book #85, 150 Pages Pcs 7 Logbook Blue 500 Leaves Pcs 12 Logbook Blue 300 Leaves Pcs 1 Logbook Blue 150 Leaves Pcs 5 Notebook W/ Cover 80 Leaves Pcs 11 Notebook (field Notebook) Pcs 44 Notebook 60 Sheets Pcs 24 Columnar Notebook 14 Columns Pcs 10 Columnar Notebook 24 Columns Pcs 4 Class Record Pcs 6 Battery Aa (4pcs) Dry Cell Heavy Duty Set 26 Battery Aa Dry Cell Heavy Duty Pcs 68 Battery Aa Dry Cell Heavy Duty Boxes 6 Battery Aaa (4pcs) Dry Cell Heavy Duty Set 14 Battery Aaa Dry Cell Heavy Duty Pcs 10 Battery Aaa Dry Cell Heavy Duty Boxes 5 Paper Clip Jumbo Boxes 55 Paper Clip Big Boxes 29 Paper Clip Small Boxes 31 Paper Clip Big Box (10 Boxes) Boxes 9 Binder Clip 1/4 Boxes 72 Binder Clip 1/2" Boxes 31 Binder Clip 3/4 Boxes 91 Binder Clip 1 1/4 Boxes 29 Binder Clip 1 5/8 Boxes 52 Binder Clip 1 Boxes 117 Binder Clip 2" Boxes 105 Binder Clip 1/2 Boxes 16 Binder Clip 1/2 Big Box (10 Boxes) Boxes 12 Calculator (12digits) Pcs 14 Ruler Pcs 12 Heavy Duty Cutter A4 (metal Cutter) Pcs 1 Cutter Ordinary Pcs 5 Heavy Duty Cutter Small Pcs 2 Certificate Holder A4 Pcs 267 Certificate Holder (8.5'x11') Short Pcs 32 Certificate Holder (8.5'x14') Long Pcs 43 Dater Pcs 2 Number Stamp Pad Pcs 3 Double Adhesive/sided Tape .5" Pcs 17 Double Adhesive/sided Tape 1" Pcs 113 Eraser Stedler Pcs 8 Cd Rewritable, Speed: 4xmin, 4.7 Gb Capacity Min. Boxes 1 Flashdrive (16gb) Pcs 4 Flashdrive (32gb) Pcs 2 Flashdrive (64gb) Pcs 3 Fastener (plastic Coated) Boxes 67 Fastener 70mm Boxes 5 Fastener Plastic 6" Boxes 3 File Divider Pcs 22 4 Layer Desk File Organizer Document Paper Tray Pcs 6 File Desk Organizer Documents Storage Rack W/ 4 Vertical Compartment Pcs 23 Metal Document File Organize Rack Pcs 3 Glue 130g Bottles 37 Glue 240g Bottles 4 Glue 473g Bottles 4 Magazine Box Pcs 14 Push Pins, No. 3351 Boxes 10 Post It Sticky Flags Pads 26 Post It Sticky Flag Signed Here Boxes 10 Post It 2m Flag Signed Here 1x1.7 Inch Pads 10 Post It 3"x3" Pads 27 Post It 3"x4" Pads 60 Pos It, 2 X 3" Pads 29 Post It, 2x4" Pads 16 Ribbon Typewriter Pcs 8 Ribbon Cloth - 1" Red Roll 5 Ribbon Cloth - 1/2" Red Roll 5 Ring Binder 1/2" Pcs 46 Ring Binder, 1/8" Pcs 61 Ring Binder 3/4" Pcs 30 Ring Binder, 1 1/4" Pcs 8 Ring Binder, 1" Pcs 9 Ring Binder, 2" Pcs 12 Ring Binder 3mm Pcs 45 Ring Binder 6mm 1/4" 30 Sheets Pcs 52 Ring Binder 8mm 5/16" 50 Sheets Pcs 18 Ring Binder 12mm 1/2" 110 Sheets Pcs 18 Ring Binder 16mm-5/8-150's Pcs 13 Ring Binder 25mm-1-220's Pcs 10 Rubber Band Small Boxes 8 Rubber Band Big Boxes 16 Scissor, Big Pcs 21 Small Scissor Pcs 2 Masking Tape 1" Pcs 45 Masking Tape 2" Pcs 26 Packing Tape 2" Pcs 48 Scotch Tape 2" Pcs 74 Scotch Tape 1" Pcs 179 Scotch Tape 1/2 Pcs 10 Duct Tape Pcs 13 Stamp Pad Ink- Black, Purple Or Violet Pcs 40 Stamp Pad Big Pcs 4 Stamp Pad Joy Pcs 19 Staple Wire #35 Boxes 94 Note Pad Stick On 76mm X 76mm X 76mm (3" X 3") Min Pink Pads 2 Note Pad Stick On (3" X 4") Min Pink Pads 8 Note Pad Stick On 50mm X 76mm (2" X 3" ) Min Pads 22 Note Pad Stick On With Lines 4"x5" Pads 4 Arrow Tabbing, Plastic Pads 50 Stapler With Remover #35 Pcs 21 Tape Dispenser Pcs 22 Pencil Sharpener Pcs 3 Clip Board With Cover (legal Size) Pcs 2 Puncher Heavy Duty Pcs 8 Shoelace/cord Pcs 12 Shoelace/cord 3/8 Inch 144 Yards Rolls 3 Plastic Cover Roll 1 Plastic Cover (yard) Yard 5 Wireless Mouse Pcs 9 Mouse Pad Pcs 32 Continous Form 11x14x7/8 Bundle 0 Rj Connectors Boxes 1 Plastic Crate (20x14x12) Pcs 2 Toner Cartridge Docucentre S2011/2320/s2520/s2110 Tube 10 Toner Copier Gestetner Mp 2014ad, Mp 2051 & Mp 2501l Tube 11 Toner Fuji S1810 Tube 1 Toner (gestetner Mp 2014h) Tube 5 Toner For Copier Big Gestener Bottles 5 Toner (xerox Machine) Dsm-dsm618 Boxes 3 Toner Cartridge (black) Pcs 1 Toner Cartridge (magenta) Pcs 1 Toner Cartridge (cyan) Pcs 1 Toner Cartridge (yellow) Pcs 1 Toner (tk-4140) Bottles Toner Xerox Machine (apeos 2150) Boxes 2 Computer Ink (black) T6641 (epson) Bottles 37 Computer Ink (cyan) T6642 (epson) Bottles 16 Computer Ink (magenta) T6643 (epson) Bottles 15 Computer Ink (yellow) T6644 (epson) Bottles 16 664 Colored (epson) Set 5 664 (black,cyan,magenta And Yellow) (epson) Set 9 Ink 003 65ml Epson (black) Bottles 163 Ink 003 65ml Epson (cyan) Bottles 103 Ink 003 65ml Epson (yellow) Bottles 83 Ink 003 65ml Epson (magenta) Bottles 104 003 Colored Set 5 Ink 003 Black,cyan,magenta, Yellow Set 36 L3110 Printer Ink Black Pcs 2 L3110 Cyan Pcs 2 L3110 Magenta Pcs 2 L3110 Yellow Pcs 2 Ink Refill (ciss) Multicolor Set 31 Ink 001 (black) Pcs 53 Ink 001 (cyan) Pcs 36 Ink 001 (magenta) Pcs 36 Ink 001 (yellow) Pcs 37 Ink 001 Colored (yellow,cyan & Magenta) Set 2 Ink 001 (black,yellow,cyan And Magenta) Set 18 Ink 008 (black) Pcs 11 Ink 008 (cyan) Pcs 11 Ink 008 (magenta) Pcs 11 Ink 008 (yellow) Pcs 11 Computer Ink T673 Colored Bottles 2 Computer Ink T673 Black Bottles 4 Ribbon Cartridge Lx 310 Boxes 9 Ribbon Cartridge Lq2190 Boxes 5 Computer Ink Refill Black Bt D60 Bottles 1 Computer Ink Refill Cyan Bt 500 Bottles 2 Computer Ink Refill Yellow Bt500 Bottles 1 Computer Ink Refill Magenta Bt500 Bottles 1 Hp 728 Ink Black,cyan,magenta Ad Yellow Set 1 Ink Cartridge Pfi-102bk Bottles 1 Ink Cartridge Pfi-102c Bottles 1 Ink Cartridge Pfi-102m Bottles 1 Ink Cartridge Pfi-102y Bottles 1 Ink Cartridge Pfi-102mbk Bottles 1 Continous Ink Black 103 Pcs 18 Continous Ink Cyan 103 Pcs 8 Continous Ink Yellow 103 Pcs 8 Continous Ink Magenta 103 Pcs 8 Ink Epson 057 Set 1
Closing Date5 Feb 2025
Tender AmountPHP 2.3 Million (USD 39.2 K)

Court Of Appeals Tender

Electronics Equipment...+1Electrical and Electronics
Philippines
Details: Description Request For Quotation Rental Service Of Professional Lights And Sounds Equipment, Led Video Wall Equipment, And Manpower For The 89th Founding Anniversary Of The Court Of Appeals (1 Lot) Amp-006-25 (svp) Sir/madam: Please Quote Your Best Proposal For The Item/s Described Below Using The Price Quotation Form (see Annex "a"), Subject To Terms And Conditions Stated Herein. Lot No. Item Description Approved Budget For The Contract 1 Rental Service Of Professional Lights & Sounds Equipment, Led Video Wall Equipment And Manpower For The 89th Founding Anniversary Of The Court Of Appeals ₱84,000.00 *the Abc Is Understood To Be The Ceiling Price; Offers Must Not Exceed The Abc Provided. The Quotation Duly Signed By You Or Your Duly Authorized Representative, Accompanied By Required Forms, Shall Be Submitted Not Later Than January 27, 2025; 11:00 Am At The Address Indicated Below: Atty. Joshua Felino Julian F. Dulce Secretariat, Bids And Awards Committee (bac) 3rd Floor, Centennial Building Court Of Appeals Ma. Orosa St., Ermita, Manila Bacsecretariat.ca@judiciary.gov.ph Only One (1) Set Of Documents Shall Be Required. To Protect The Integrity Of The Quotation, Bidders Are Encouraged To Submit Their Documents In A Sealed Envelope Or In A Compressed Archived Password-protected Envelope In Case Of Electronic Submission. The Sealed Envelope Shall Contain The Name Of The Contract To Be Bid In Capital Letters And Bear The Name And Address Of The Supplier In Capital Letters. Quotations And Other Documents Required May Either Be Submitted Manually At 3rd Floor Office Of The Bac Secretariat, Centennial Building, Court Of Appeals, Ermita, Manila Or Electronically To Bacsecretariat.ca@judiciary.gov.ph On Or Before The Deadline Of Submission As Stated In This Rfq. In Case Of Modification, It Must Be Done Before The Deadline For The Submission And Receipt Of Quotations And Labelled As A “modification”. The Time Stamped Or Indicated In The Latest Proposal Received Shall Be The Official Time Of Submission. The Bac Shall Assume No Responsibility For The Misplacement Of The Contents Of The Improperly Sealed Or Marked Bid, Or Submission Of Corrupted Files, Or For Its Premature Opening. Late Submission Of Quotations Shall Not Be Accepted And Considered. Atty. Arnel D. Macapagal Assistant Clerk Of Court Chairperson, Bids And Awards Committee The Price Quotation Form (annex “a”) Shall Be Submitted On Or Before The Deadline For Submission And Receipt Of Quotation. The Eligibility Requirements May Be Submitted Together With The Price Quotation Form, Or Not Later Than Two (2) Days From Receipt Of Notice From The Bac Secretariat Requiring The Submission Thereof. No Requirements Instruction 1 Price Quotation Form (annex “a”) Must Indicate The Unit And Total Price. Must Indicate The Required Information. Must Be Duly Signed By The Authorized Representative. 2 Mayor’s Permit For The Year 2025 Must Be Valid For The Year 2025. A Recently Expired Mayor’s Permit Together With The Official Receipt As Proof That The Prospective Bidder Has Applied For Renewal Within The Period Prescribed By The Concerned Local Government Unit Shall Be Accepted. 3 Philgeps Registration Number Submit Proof Of Registration (picture Or Screenshot Of Philgeps Registration On The Website) 4 Omnibus Sworn Statement (oss) (annex “b”) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Special Power Of Attorney In Case Of Sole Proprietorship; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Ensure That There Are Eleven (11) Declarations. Indicate Required Information. Attach Competent Evidence Of Identification (valid Government-issued Id. The Use Of Cedula Is Not Acceptable). Must Be Duly Notarized And Signed. Terms And Conditions: 1. Bidders Shall Provide Correct And Accurate Information Required In This Form. 2. Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By You Or Any Of Your Duly Authorized Representative/s. 3. Price Quotations/s Must Be Valid For A Period Of Forty-five (45) Calendar Days From The Deadline Of Submission. 4. Quotations Exceeding The Abc Or Submitted Beyond The Deadline Shall Be Rejected. 5. Price Quotation/s — To Be Denominated In Philippine Peso — Shall Include All Taxes, Duties, And/or Applicable Discounts, If Any. 6. Award Of Contract Shall Be Made To The Lowest Quotation Which Complies With The Technical Specifications, Requirements And Other Terms And Conditions Stated Herein. 7. In Case Two Or More Bidders Are Determined To Have Submitted The Lowest Calculated And Responsive Quotation, The Court Of Appeals Shall Adopt And Employ “draw Lots” As The Tiebreaking Method To Finally Determine The Winning Bidder In Accordance With Gppb Circular No. 06-2005. 8. The Item/s Shall Be Delivered According To The Accepted Offer Of The Bidder. 9. The Court Of Appeals May Cancel Or Terminate The Contract At Any Time Under Any Of The Grounds Provided Under Ra No. 9184 And Its 2016 Revised Irr. 10. The Rfq, Purchase Order (contract), And Other Related Documents To The Above Stated Procurement Project Shall Be Deemed To Form Part Of The Contract. 11. The Notice Of Award, Letter Order, And Notice To Proceed Are Deemed Received As Of The Date Of Their Transmittal To The Winning Bidder’s Official Email Address. Hence, The Relevant Periods Under Ra No. 9184 And Its Irr, And The Rfq Shall Commence From Receipt Thereof. 12. Liquidated Damages Equivalent To One-tenth Of One Percent (0.1%) Of The Value Of The Goods Not Delivered Within The Prescribed Delivery Period Shall Be Imposed Per Day Of Delay. The Court Of Appeals May Terminate The Contract Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. 13. Payment Shall Be Made After Delivery And Only Upon The Submission Of The Required Supporting Documents, I.e. Delivery Receipt And Sales Invoice Or Official Receipt, By The Supplier, Contractor, Or Consultant Within Thirty (30) Calendar Days. In Case Of Accounts Maintained In Banks Other Than Landbank Of The Philippines, Bank Transfer Fees Shall Be Chargeable Against The Creditor’s Account. 14. For Payment Purposes, The Awarded Service Provider, Supplier, Or Consultant Is Required To Submit A Certified Copy Of Its Tax Clearance Certificate For Final Settlement Of Government Contracts And Bir Certificate Of Registration Or Bir Form 2303 In Accordance With Relevant Revenue Regulations. Annex "a" Price Quotation Form Date: _____________ The Chairperson, Bids And Awards Committee Court Of Appeals Ma. Orosa St., Ermita, Manila Sir: Having Examined The Request For Quotation No. Amp-006-25 (svp) The Receipt Of Which Is Hereby Duly Acknowledged, The Undersigned Offers The “rental Service Of Professional Lights & Sounds Equipment, Led Video Wall Equipment, And Manpower For The 89th Founding Anniversary Of The Court Of Appeals”, In Conformity With The Said Request For Quotation For The Sums Stated Hereunder: Uom Item Description Qty Total Price Professional Lights And Sounds Equipment 1 Lot Dj Controller 1 Unit 17” Laptop With Minimum Cpu Specifications Of At Least 3.00ghz And At Least 6 Core Count 1 Unit 22 Chanel Professional Studio Mixer 1 Unit 2000w Power Amplifiers Sound Processor 1 Set Powered Speaker 6 Units Sub Woofers 2 Units Wireless Microphones With Case 4 Units Par Lights 16 Units Light Stand 2 Units 90w Moving Heads 6 Units Smoke Machine 1 Unit Dj Boxes, Cables And Connectors 1 Set Speakers And Microphone Stand 2 Sets Dmx Controller 1 Unit Led Video Wall Equipment P3 Led Wall 9ft X 24ft 1 Set Led Riser 1 Set Video Processor And Controller 1 Set Video Switcher 1 Set Cables And Connectors 1 Set Computer Workstation 1 Set Stage And Accessories – 16x24x2 Ft. (lxwxh) Stage 1 Set Manpower Disk Jockey At Least 1 Personnel Sound Technician At Least 2 Personnel Light Technician At Least 4 Personnel Video Technician At Least 1 Personnel Stagehand At Least 3 Personnel Handyman At Least 3 Personnel Total Price In Figures: Total Price In Words: ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ _________________________ Signature Over Printed Name _________________________ Position/designation _________________________ Office Telephone/mobile Nos. _________________________ Email Address After Having Carefully Read And Accepted The Above-mentioned Instructions And Terms And Conditions, I/we Submit Our Quotations For The Items/s As Follows: Technical Specifications Must Comply With The Following Minimum Requirements: Rental Service Of Professional Lights & Sounds, Led Video Wall Equipment, And Manpower For The 89th Founding Anniversary Of The Court Of Appeals (1 Lot) I. Approved Budget For The Contract: The Approved Budget For The Contract Is Eighty-four Thousand Pesos (php84,000.00) Inclusive Of All Applicable Taxes And Charges. Ii. Requirements: The Supplier Shall Supply And Deliver The Following Requirement: Lot Item Description Qty 1 Lot Professional Lights And Sounds Equipment Dj Controller 1 Unit 17” Laptop With Minimum Cpu Specifications Of At Least 3.00ghz And At Least 6 Core Count 1 Unit 22 Chanel Professional Studio Mixer 1 Unit 2000w Power Amplifiers Sound Processor 1 Set Powered Speaker 6 Units Sub Woofers 2 Units Wireless Microphones With Case 4 Units Par Lights 16 Units Light Stand 2 Units 90w Moving Heads 6 Units Smoke Machine 1 Unit Dj Boxes, Cables And Connectors 1 Set Speakers And Microphone Stand 2 Sets Dmx Controller 1 Unit Led Video Wall Equipment P3 Led Wall 9ft X 24ft 1 Set Led Riser 1 Set Video Processor And Controller 1 Set Video Switcher 1 Set Cables And Connectors 1 Set Computer Workstation 1 Set Stage And Accessories – 16x24x2 Ft. (lxwxh) Stage 1 Set Manpower Disk Jockey At Least 1 Personnel Sound Technician At Least 2 Personnel Light Technician At Least 4 Personnel Video Technician At Least 1 Personnel Stagehand At Least 3 Personnel Handyman At Least 3 Personnel Iii. Terms Of Payment: Payment Shall Be Made After Delivery And Only Upon The Submission Of The Required Supporting Documents, I.e. Delivery Receipt And Sales Invoice Or Official Receipt, By The Supplier, Contractor, Or Consultant Within Thirty (30) Calendar Days. In Case Of Accounts Maintained In Banks Other Than Landbank Of The Philippines, Bank Transfer Fees Shall Be Chargeable Against The Creditor’s Account. Payment Details: Banking Institution: ________________________________________________ Account Number: __________________________________________________ Account Name (should Be The Exact Account Name As Registered In The Bank): ________________________________________________________________ Bank Branch: _____________________________________________________ Iv. Delivery Address: Court Of Appeals, Ma. Orosa St., Ermita, Manila V. Delivery Requirements: Delivery Shall Be Made On Or Before 6:00 Am Of 03 February 2025, At Court Of Appeals – Manila, Maria Orosa St. Ermita, Manila. By Affixing My Signature Below, I Am Confirming Our Compliance With The Technical Specifications/terms Of Reference Stated Above. I Further Certify That Such Compliance Is True And Correct; Otherwise, If Found To Be False Either During The Bid Evaluation Or Post-qualification, The Same Shall Give Rise To Automatic Disqualification Of Our Bid. We Undertake, If Our Quotation Is Accepted, To Perform The Services/deliver The Goods In Accordance With The Schedule Of Requirements And Technical Specifications. Until A Formal Contract Is Prepared And Executed, This Quotation, Together With Your Written Acceptance Thereof And Your Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Or Any Quotation You May Receive. Date Company Name Authorized Representative Name/signature Address Official Contact Number ________________________ Email Address Annex “b” Omnibus Sworn Statement (revised) Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity; 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code; 11. [name Of Bidder] Hereby Assigns The Following Contact Number/s And E-mail Address/es As The Official Telephone/fax Number And Contact Reference Of The Company Where The Ps Bac And Ps Notices May Be Transmitted. Telephone No/s.: ________________________________ Fax No/s.: ________________________________ E-mail Add/s.: ________________________________ Mobile No.: ________________________________ It Is Understood That Notices/s Transmitted In Any Of The Above-stated Telephone/fax Numbers And/or E-mail Address/es Are Deemed Received As Of Its Transmittal And The Reckoning Period For The Reglementary Periods Stated In The Bidding Documents And The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 Shall Commence From Receipt Thereof. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Known To Me, And Known To Be The Same Person/s In The Exhibited [insert Type Of Government Identification Card Used*], With His/her Photograph And Signature Appearing Thereon, With No.________________________ Issued On ______________________ At ____________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission ___________ Notary Public For ______ Until _______ Roll Of Attorney's No. _____________ Ptr No. _______ [date Issued], [place Issued] Ibp No. _______ [date Issued], [place Issued] Doc. No. ______ Page No. ______ Book No. _____ Series Of _____.
Closing Soon27 Jan 2025
Tender AmountPHP 84 K (USD 1.4 K)

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Laboratory Equipment and Services
United States
Details: Statement Of Work 1. Title: Boiler Plant Instrumentation Calibration, Combustion And Tune, Device Testing And Motor Vibration Analysis Services To Support The St. Cloud Va Health Care System. 2. Overview: The Contractor Shall Provide Boiler Safety Device Testing, Tuning, Inspection, Calibration Of Boiler Plant Equipment, Burners, Controls, Instruments At The Frequency Described On The Schedule Below. 3. Definitions: a. Co Contracting Officer b. Va Department Of Veterans Affairs c. Vahcs St. Cloud Va Health Care System d. Vatr Veterans Affairs Technical Representative e. Contractor Employee Means All Contractor Staff, Technicians, Personnel, Subcontractors, Or Persons Working On Behalf Of The Contractor. 4. Place Of Performance: st. Cloud Va Health Care System, 4801 Veterans Drive, St. St Cloud, Mn 56303 period Of Performance: this Contract Will Be A Single Award, Firm Fixed Price Service Contract For 1 (one) Base Year From With 4 (four) Option Years. qualifications And Special Certifications: certified Technicians Shall Have Completed At Least A One-year Trade School And Have Five Years Successful Experience In This Field. The Experience Shall Be Largely With Institutional And Industrial Boiler Plants Similar In Design To The Vahcs Plant. the Vahcs Facility Manager/engineer May Define And Accept Equivalent Qualifications. technicians Shall Demonstrate Familiarity With And Ready Access To The Current Versions Of The Following References: nfpa 85, Boiler And Combustion Systems Hazards Code. vha Boiler Plant Safety Device Testing Manual, Most Current Edition. technicians Shall Be Equipped With Portable Electronic Flue Gas Analyzers And Other Test Instruments Necessary For The Required Tests And Calibrations, To Calibrate All Instruments, Gauges, And Transmitters As Required Herein. All Must Be Calibrated Within One Month Prior To Test P-1 And P-4, Or Recalibration Must Be Completed. at Facilities With Programmable Digital Controls, The Technicians Must Be Capable Of Programming The Controls And Have The Appropriate Hardware And Software For This. any Anticipated Sub-contracting Work Shall Be Presented In A Sub-contracting Plan, Which Is To Include The Identity Of The Sub-contractor Who Will Be Performing The Work. The Co And The Vatr Must Approve, In Writing, Any Sub-contract Work Prior To Its Commencement. the Contractor Shall Provide Experience, Past Performance, And References With Their Bid Submission. regulations / Directives / Policies: vha Directive 1810, Boiler And Boiler Plant Operations (most Current Version) vha Boiler Plant Safety Device Testing Manual (most Current Version) master Construction Specification, Division 23- Heating, Ventilating And Air Conditioning. nfpa 85 - National Fire Protection Association. Boiler And Combustion Systems Hazards Code (most Current Edition) boiler Safety Device Testing Data Sheet combustion Performance Data Sheet compliance With All State, Federal, And Local Laws scope Of Work: the Contractor Shall Provide All Transportation, Lodging, Meals, Labor, Personnel, Equipment, Tools, Materials, And Any Resources Necessary To Provide The Following Services. Semiannual Boiler Combustion And Tune, Semiannual Instrument Calibration To Include All Associated Instruments, Semiannual Motor Vibration Analysis, And Annual Safety Device Testing. special Notes: Only One Boiler Is Allowed To Be Offline For Testing/tune Purposes At A Time! if A Boiler Plant Emergency, Site Emergency, Or National Emergency Develops, Contractor Will Cease Testing At The Request Of Site Personnel. boiler Performance Testing: p1 Through P4 Shall Be Completed In Accordance With Vha Directive 1810 (most Current Edition) And Vha Boiler And Associated Plant Safety Device Testing Manual (most Current Edition) p-1 - Semiannual Boiler Combustion And Tune p-2 - Semiannual Instrumentation Calibration p-3 - Semiannual Motor Vibration Analysis p-4 - Annual Safety Device Testing tests Will Follow Vha Boiler Plant Safety Device Testing Manual Procedures Verbatim. technicians Shall Provide All Tools, Equipment, And Labor Necessary To Perform Inspection, Testing, Calibrating, And Adjustments Of Burners And Boiler And Boiler Plant Controls As Specified Below. this Shall Be Done Every Six Or Twelve Months In Accordance With A Schedule Provided By Vahcs. instrumentation, Monitoring, And Data Management Systems As Listed Per Directive 1810 Appendix B Table 2 Number 10 Shall Be Calibrated Every Six Months. provide At Least Two Weeks Notice To The Boiler Plant Supervisor Prior To Performing The Work. work Must Be Conducted When The Boiler Plant Supervisor Or His/her Designate Is Available On Site To Monitor The Work. during Normal Business Hours Unless Approved By The Boiler Plant Supervisor. vahcs Will Have The Boilers That Are To Be Serviced Prepared For The Technicians Upon Their Scheduled Arrival. this Includes Having The Boilers Clean Of Soot And Loose Scale; Fully Warmed And At Normal Steam Pressure; Steam Exhaust Silencer System Operable. performance Testing Of Boiler, Burner, Economizer (if Provided), Combustion Control, Boiler Plant Instrumentation To Be Done In Accordance With Va Master Construction Specifications, Office Of Construction And Facilities Management Til (technical Information Library) Division 23. perform Overall Visual Inspection Of Systems. Observing Any Minor Or Major Deficiencies Before Administering Test Procedures. verify That Systems Comply With Referenced Code And Vahcs Requirements. perform Tests On Each Boiler On All Main Burner Fuels. operate Burner(s) On Each Fuel From Low Fire To High Fire And Back To Low Fire In At Least Twelve Increments And Record Combustion Performance, Flue Gas Oxygen, Carbon Monoxide, Nox, Fuel Train Pressures, Atomizing Train Pressures, Burner Pressures, Combustion Air Temperature, Flue Temperatures And Boiler Steam Output. if Required By Local Emissions Authorities, Provides Services Of Testing Firm To Determine Nox And Carbon Monoxide. Test Firm Shall Be Acceptable To Emissions Authorities. note: If Nox Emissions Limits Are Applicable, List The Method Of Testing That Is Required By Local Authorities If It Differs From The Method Listed. nox Emissions Shall Be Tested With Electronic Analyzer Reading In Parts Per Million. Analyzer Shall Be Calibrated With Certified Test Gas Within Three Months Prior To Use. Analyzer Shall Be Accurate To Plus Or Minus 5% Of Reading. test No. P-1: Combustion And Tune operate Boiler On Each Fuel, With Economizer (if Provided) In Service And Record Data For At Least Twelve Evenly Spaced Steam Loads From Low Fire Start To 100% Of Full Steam Output, And In The Same Sequence Back To Low Fire. demonstrate Performance And Efficiency Required By Paragraphs Under Articles, Boiler, Burner And Fuel Trains, And Economizer. demonstrate Proper Operation Of Combustion Controls, Draft Control (if Provided), Feed Water Level Controls, And Instrumentation Systems (section 23 09 11, Instrumentation And Control For Boiler Plant). when Flue Gas Oxygen Trim Is Provided, Conduct Tests With Trim Control On Manual At The Zero Trim (null) Position (section 23 09 11, Instrumentation And Control For Boiler Plant). after Completion Of Tests With Trim Control On Manual Control, Repeat The Tests On One Fuel With The Trim Control On Automatic Control. test No. P-2: Calibration check Current Draw Of Forced Draft Fan Motor At Startup And At 100 Percent Of Maximum Boiler Load. current Draw Shall Not Exceed Full Load Current Stamped On Motor Nameplate. this Test May Be Combined With Test No. P-1. list Of Instrumentation And Controls To Be Inspected And Calibrated: (yokogawa, Rose Mount, Cleaver Brooks, Mcdaniel, Trerice, Setra, Ashcroft, Ari Industries Inc, Siemens.) steam Flow Transmitters (all). steam Flow Recorders/computer Readout. flue Gas Oxygen Sampling, Analyzing And Recorder/computer Readout. boiler And Economizer Stack Temperature Transmitters And Recorder/computer Readout. master Steam Pressure And Combustion Controllers. boiler Outlet Draft Controllers. boiler Water Level Controllers. feedwater Deaerator And Condensate Storage Tank Water Level Controllers Including Overflow. all Pressure And Temperature Sensors, Gauges, And Transmitters. test Methods: utilize Permanent Instrumentation Systems For Data. All Systems Shall Be Operable And In Calibration. utilize Portable Thermocouple Pyrometer Furnished And Retained By Contractor To Measure Stack Temperature As A Verification Of Permanent Stack Temperature Recorder. use Portable Electronic Flue Gas Analyzer To Determine Constituents Of Flue Gas. analyzer Shall Be Capable Of Measuring Oxygen In Percent With Accuracy Of Plus Or Minus 0.5 Percent Oxygen And Carbon Monoxide In Parts Per Million (ppm) With Accuracy Of Plus Or Minus 5 Percent Of Reading (range 0-l000 Ppm). obtain Oxygen And Carbon Monoxide Readings At Each Test Point. calibrate Instrument With Certified Test Gases Within Three Months Prior To Use And Immediately After Analyzer Cell Replacement. in Test No. P-1 Retain Boiler At Each Load Point For A Time Period Sufficient To Permit Stabilization Of Flue Gas Temperature And Other Parameters. steam Loads For Tests May Be Furnished By The Hospital Systems, By Operation Of The Steam Silencer Vent System, Or By A Combination Of The Above. utilize Dry Bulb And Wet Bulb Thermometers Furnished And Retained By Contractor For Checking Combustion Air. smoke Testing Shall Be By Visual Observation. if Smoke Density Monitor Is Not Provided, Utilize Bacharach Model 21-7006 Smoke Test Kit. if There Is Disagreement With The Results Of These Tests, Provide Qualified Observation Person And Tests In Compliance With Epa Reference Method 9 (cfr 40, Part 60, Appendix A). an Additional Efficiency Test Will Be Required, Conforming To Asme Performance Test Code Ptc 4, If The Boiler Efficiency Determined In The Test P-1 Above, Does Not Comply With Requirements. utilize Asme Test Forms Ptc 4.1.a, 4.1.b, And The Abbreviated Input-output And Heat Balance Methods. compare The Combustion Performance Data With Vahcs Requirements And Previous Readings. (flue Gas Oxygen, Carbon Monoxide And Nox). if Necessary, Make Adjustments To The Fuel, Combustion Air Controllers, And Fgr Controller And Damper To Obtain The Required Performance. record The New Performance Data. Flash S.d. Card With New Tune. p-3: Motor Vibration Analysis check Vibration Of All Electric Motors In The Boiler Plant: Burner Fans, Feed Water Motors, And Condensate Motors. Total Of 9 Motors. equipment List: description type make model/serial Number year boiler 1 fire Tube cleaver Brooks 200-600-200 2008 boiler 2 fire Tube cleaver Brooks 200-600-200 2008 boiler 3 fire Tube cleaver Brooks 200-600-200 2008 boiler 4 fire Tube cleaver Brooks 200-400-200 2008 da Tank industrial Steam stamp # 13194 2008 surge Tank industrial Steam stamp # 13138 2008 va Technical Representatives: Primary: Boiler Plant Supervisor, 320-252-1670 Ext. 6829 Alternate: Lead Plant Operator, 320-252-1670 Ext. 6347 11. Schedule: contractor Shall Perform On-site Services During Normal Business Hours, 8:00 Am To 4:30 Pm, Monday Through Friday, Excluding Federal Holidays, Unless Otherwise Coordinated With The Vatr. if A Holiday Falls On Sunday, The Following Monday Will Be Observed As The Legal Holiday. If A Holiday Falls On Saturday, The Preceding Friday Is Observed As A Legal Holiday. the Eleven National Holidays Observed By The Federal Government Are: New Years Day January 1 Martin Luther King Jr. Day Third Monday In January Presidents Day Third Monday In February Memorial Day Last Monday In May Juneteenth June 19 Independence Day July 4 Labor Day First Monday In September Columbus Day Second Monday In October Veterans Day November 11 Thanksgiving Day Fourth Thursday In November Christmas Day December 25 Any Additional Federal Holiday Declared By The President Of The United States the Contractor Shall Coordinate With The Vatr For An Agreed Upon Work Schedule To Determine When Services Can Be Performed. work May Be Required To Be Performed Outside Of Normal Duty Hours If Mutually Agreed Upon By The Vatr Or Designate And Contractor. Any Work Resulting In Hours Outside Of 8:00 Am To 4:30 Pm Ct Because Of Operational Impacts Shall Occur At No Additional Expense To The Government. the Contractor Shall Provide A Minimum Of 48-hour Notice Of Any Schedule Changes. schedule: description type make model Number Serial Number year type Of Service testing Month(s) boiler # 1-3 Boiler # 4, da Tank, surge Tank fire Tube cleaver Brooks 200-600-200 200-400-200 2008 instrument Calibration april - May October - November boiler # 1-3 Boiler # 4, da Tank, surge Tank fire Tube cleaver Brooks industrial steam 200-600-200 200-400-200 2008 safety Device Testing october november boiler # 1-3 Boiler # 4 fire Tube cleaver Brooks 200-600-200 200-400-200 2008 combustion Tuning april - May October - November boiler # 1-3 Boiler # 4, da Tank, surge Tank fire Tube cleaver Brooks industrial steam 200-600-200 200-400-200 2008 motor Vibration Analysis april - May October - November 12. Reporting Requirements: performance Data Reports: The Contractor Shall Develop And Submit To The Government For Approval, A Written Report For Instrumentation And Calibration, And Vibration Analysis Within Ten (10) Calendar Days After Contract Award. the Contractor Shall Submit Completed Required Reports On All Services To The Vatr Within Fifteen (15) Business Days From The Completion Of Services. at A Minimum, The Report Shall Contain: device Description And/or Model Number date(s) Of Services method equipment Inspection Checklist And Comment Section For Identifying System Defects name And Signature Of Service Technician defects/deficiencies (if Applicable) combustion Performance Data Sheet 13. Service Label: after A Calibration/testing/inspection/analyzed Service Has Been Accomplished For Each Device, A Service Label Shall Be Placed Conspicuously, Readily Accessible, Visible, And Legible, On The Device In The Immediate Vicinity Of The System Tag Or Existing Device Label. the Label Shall Be Writeable And Made Of Heat Resistant, Self-destructing Material With Self-sticking Adhesive On The Back. the Label Shall Be Pre-printed With The Following Information: company Name Or Identifier (logo) With The Company S Full Address technician Name (signature Line) all Information Pertaining To Complete Date Of Service: Year, Month, Day. this System Has Been: Inspected Or Certified all Information Pertaining To Next Service Due: Days And Years. this Information Shall Be Clearly And Permanently Affixed To The Label Capable Of Withstanding The Elements. 14. Safety Requirements: safety Requirements And Reporting: the Contractor Is Solely Responsible For Compliance With All Federal, State, And Local Laws, The Occupational, Safety And Health Act (osha) (public Law 91-596) And The Resulting Standards, Osha Standards 29 Cfr 1910 And 1926, As Applicable And Shall Perform All Work In A Safe Manner As Required By These Standards. the Contractor Shall Implement An Occupational Safety And Health Plan To Ensure The Safety Of Their Personnel, As Well As The Protection Of Government Personnel And Property. Additionally, The Contractor Is Responsible For The Safety And Health Of All Sub-contractor Employees. the Contractor Shall Provide A Verbal Report To The Co Within 24 Hours Of An Accident Resulting In Injury, Death, Occupational Disease, Or Adverse Environmental Impact. the Contractor Shall Provide A Completed Copy Of Required Accident Investigation Reports To The Co Within Five Calendar Days Of Each Occurrence. safety: the Contractor Shall Have In Place A Documented And Comprehensive Health And Safety Program To Ensure All Shredding Activities Are Provided In A Safe And Secure Manor. 15. Security Requirements: badges: contractor And/or All Sub-contracted Personal Are Required To Always Wear And Have Visible A Contractor Badge. badges Are Issued By Facilities Management (fm), B-3, Second Floor. Fm Office Hours Are Monday Friday, 8:00 Am 4:30 Pm. the Contractor Shall Be Required To Obtain And Display Identification Badges For All Employees Requiring Access To The St Cloud Va Facility. these Badges Will Be Government Furnished And Issued To Contractor Employees Upon Initial Entry, Under Contract. identification Shall Be Always Worn On The Outer Clothing Between The Neck And Waist On The Front Of The Body And Visible With The Contractor S Name Plainly Displayed. loss Of A Contractor Badge Shall Be Reported To The Vatr No Later Than The Following Workday. There Is A $30.00 Fee For A Lost Badge. all Contract Personal Shall Be Checked In By Facilities Management (fm) Located In Building 3, Second Floor. contractor Personnel Will Be Escorted By Va Staff. 16. Damage To Government Equipment And Property: the Contractor Shall Take All Necessary Precautions To Prevent Damage To Government Equipment And Property. the Contractor Shall Report Damage Of Government Property Or Equipment To The Contracting Officer And/or Vatr Within 24 Hours Of The Incident. 17. Invoicing: the Contractor Shall Submit Invoice(s) In Arrears After The Services Have Been Completed. invoice Shall Include, But Not Limited To: contract Number purchase Order (po) Number (changes Each Option Year) date Of Service location description quantities 18. References: reference Upon Request 1 - Master Construction Specification, Division 23- Heating, Ventilating And Air Conditioning attachments: 1 - Vha Directive 1810, Boiler And Boiler Plant Operations 2 - Vha Boiler Plant Safety Device Testing Manual -most Current Edition 3 - Combustion Performance Data Sheet 4 Safety Device Testing Data Sheet
Closing Soon24 Jan 2025
Tender AmountRefer Documents 
5581-5590 of 5606 active Tenders