Printing Tenders
Printing Tenders
Department Of Public Works And Highways - DPWH Tender
Civil And Construction...+1Civil Works Others
Philippines
Details: Description Invitation To Bid (ib) The Department Of Public Works And Highways (dpwh) Nueva Vizcaya First District Engineering Office, Through Its Bids And Awards Committee (bac), Invites Contractors To Submit Bids For The Following Contract/s: 1. Contract Id # : 25bi0049 Name Of Project : Convergence And Special Support Program – Bip – Flood Mitigation Structures Protecting Major/strategic Public Buildings/facilities – Rehabilitation Of Flood Control Structure Along Magat River, Magapuy Location Of Project : Bayombong, Nueva Vizcaya Indicative Approved Budget For The Contract (abc) : Php. 38,600,000.00 Project Description : Construction Of Slope Protection Works (steel Sheet Pile) With Embankment, Mattresses And Gabions Duration : 289 Calendar Days Cost Of Bid Documents : Php 25,000.00 Source Of Fund : Regular Infra Fy 2025 Pcab License Size Range : Medium ”a” 2. Contract Id # : 25bi0050 Name Of Project : Convergence And Special Support Program – Bip – Flood Mitigation Structures Protecting Major/strategic Public Buildings/facilities – Construction Of Flood Control And Drainage Structure Along Magat River, Tuao North Section Location Of Project : Bagabag, Nueva Vizcaya Indicative Approved Budget For The Contract (abc) : Php. 96,500,000.00 Project Description : Construction Of Slope Protection Works (steel Sheet Pile) With Embankment, Mattresses And Gabions Duration : 320 Calendar Days Cost Of Bid Documents : Php 50,000.00 Source Of Fund : Regular Infra Fy 2025 Pcab License Size Range : Medium ”a” 3. Contract Id # : 25bi0051 Name Of Project : Convergence And Special Support Program – Bip – Flood Mitigation Structures Protecting Major/strategic Public Buildings/facilities – Construction Of Flood Control Along Magat River, Sitio Kinacao, Brgy. Beretbet Location Of Project : Bagabag, Nueva Vizcaya Indicative Approved Budget For The Contract (abc) : Php. 38,600,000.00 Project Description : Construction Of Slope Protection Works (steel Sheet Pile) With Embankment, Mattresses And Gabions Duration : 289 Calendar Days Cost Of Bid Documents : Php 25,000.00 Source Of Fund : Regular Infra Fy 2025 Pcab License Size Range : Medium ”a” 4. Contract Id # : 25bi0052 Name Of Project : Organization Outcome 1: Ensure Safe And Reliable National Road System – Asset Preservation Program – Rehabilitation/reconstruction Of Roads With Slips, Slope Collapse And Landslide – Tertiary Roads – Papaya-malabing- Wangal-binugawan-tadji-runruno Rd., K0313+700 – 313+800 Location Of Project : Quezon, Nueva Vizcaya Indicative Approved Budget For The Contract (abc) : Php. 96,500,000.00 Project Description : Provision Of Slope Protection Works Duration : 312 Calendar Days Cost Of Bid Documents : Php 50,000.00 Source Of Fund : Regular Infra Fy 2025 Pcab License Size Range : Medium ”a” 5. Contract Id # : 25bi0053 Name Of Project : Organization Outcome 1: Ensure Safe And Reliable National Road System – Asset Preservation Program – Rehabilitation/reconstruction Of Roads With Slips, Slope Collapse And Landslide – Tertiary Roads – Papaya-malabing- Wangal-binugawan-tadji-runruno Rd., K0314+900 – 315+000 Location Of Project : Quezon, Nueva Vizcaya Indicative Approved Budget For The Contract (abc) : Php. 96,500,000.00 Project Description : Provision Of Slope Protection Works Duration : 312 Calendar Days Cost Of Bid Documents : Php 50,000.00 Source Of Fund : Regular Infra Fy 2025 Pcab License Size Range : Medium ”a” 6. Contract Id # : 25bi0054 Name Of Project : Organization Outcome 1: Ensure Safe And Reliable National Road System – Asset Preservation Program – Rehabilitation/reconstruction Of Roads With Slips, Slope Collapse And Landslide – Tertiary Roads – Bambang-kasibu- Quezon-solano Rd., K0320+100 – K0320+200 Location Of Project : Quezon, Nueva Vizcaya Indicative Approved Budget For The Contract (abc) : Php. 96,500,000.00 Project Description : Provision Of Slope Protection Works Duration : 312 Calendar Days Cost Of Bid Documents : Php 50,000.00 Source Of Fund : Regular Infra Fy 2025 Pcab License Size Range : Medium ”a” 7. Contract Id # : 25bi0055 Name Of Project : Organization Outcome 1: Ensure Safe And Reliable National Road System – Asset Preservation Program – Rehabilitation/reconstruction Of Roads With Slips, Slope Collapse And Landslide – Tertiary Roads – Bambang-kasibu- Quezon-solano Rd., K0322+900 – K0323+000 Location Of Project : Quezon, Nueva Vizcaya Indicative Approved Budget For The Contract (abc) : Php. 96,500,000.00 Project Description : Provision Of Slope Protection Works Duration : 312 Calendar Days Cost Of Bid Documents : Php 50,000.00 Source Of Fund : Regular Infra Fy 2025 Pcab License Size Range : Medium ”a” 8. Contract Id # : 25bi0056 Name Of Project : Organization Outcome 1: Ensure Safe And Reliable National Road System – Asset Preservation Program – Rehabilitation/reconstruction Of Roads With Slips, Slope Collapse And Landslide – Tertiary Roads – Bambang-kasibu- Quezon-solano Rd., K0326+850 – K0326+950 Location Of Project : Quezon, Nueva Vizcaya Indicative Approved Budget For The Contract (abc) : Php. 96,500,000.00 Project Description : Provision Of Slope Protection Works Duration : 312 Calendar Days Cost Of Bid Documents : Php 50,000.00 Source Of Fund : Regular Infra Fy 2025 Pcab License Size Range : Medium ”a” The Bac Is Conducting The Public Bidding For This Contract In Accordance With Republic Act No. 9184 And Its Implementing Rules And Regulations (irr). To Be Eligible To Bid For This Contract, A Contractor Must Meet The Following Major Requirements: (a) Filipino Citizen Or 75% Filipino-owned Partnership/corporation With Pcab License Size Range Medium “a” (b) Completion Of A Similar Contract Costing At Least 50% Of The Abc*, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. The Dpwh Will Use Non-discretionary "pass/fail" Criteria In The Eligibility Check. Bids Received In Excess Of The Abc Shall Be Automatically Rejected On Bid Opening. The Completeness And Correctness Of The Bid Will Be Determined During The Detailed Evaluation Of Bids. Contractors Shall Also Be Able To Meet The Post-qualification Criteria Of The Project As Stated In The Bidding Documents Of The Projects. Strict Application Of R.a. 9184 Of Post-qualification Of Bidders With Delayed On-going Contracts With The Dpwh, (department Order No. 127 Series 2018). Lf At The Time Of Post-qualification Procedure, The Bac Verifies That Any Of The Deficiencies Is Due To The Contractor's Fault Or Negligence Pursuant To 34.3(b)11)(c) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 (2016 Rirr Of Ra 9184), The Procuring Entity Shall Disqualify The Contractor From The Award Without Any Right To Reimburse Fees And Incidental Cost Paid For The Procurement Contract Subject Of The Bid".” The Schedule Of Key Procurement Activities For This Contract Is Shown Below: Activity Time Place 1. Issuance/downloading Of Bidding Documents January 15, 2025 To February 4, 2025 *hard Copies At Bac Secretariat, Dpwh-nv-1st. Deo, Bayombong, Nueva Vizcaya *downloadable From Free Of Charge From Dpwh Website Www.dpwh.gov.ph, Philgeps Website: Www.philgeps.gov.ph 2. Pre-bid Conference January 23, 2025 @9:00 A.m. Bac Bidding Room, Dpwh Nv 1st. Deo 3. Receipt By The Bac Of Bids Deadline: 9:00 Am On February 4, 2025 Bac Bidding Room, Dpwh Nv 1st. Deo 4. Opening Of Bids 9:01 Am On February 4, 2025 Bac Bidding Room, Dpwh Nv 1st. Deo Via Youtube Live @dpwhnuevavizcaya1stdeo Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_nuevavizcaya@dpwh.gov.ph For Electronic Submission On Or Before February 4, 2025 ; 9:00 A.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bidders Shall Pay The Bac An Applicable Fee Up To 9:00 A.m. Of February 4, 2025 For The Bidding Documents, Upon Securing Hard Copies Of The Documents. Bidders That Download The Documents From The Dpwh/ Phil-geps Website Shall Pay The Fee Upon Submission Of Their Bids. Bid Documents Should Be Printed In A4 Size Bond Paper. The Dpwh – Nueva Vizcaya First District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Any Requests For Additional Information Concerning This Bidding Shall Be Directed To The Following: Bac Secretariat Head: Bryan Neil G. Augusto Address: Dpwh-nv 1st. Deo Tel. No. (078) 362-0234 Email Address: Augusto.bryan_neil@dpwh.gov.ph Approved By: Eduardo B. Sibayan Asst. District Engineer Bac, Chairperson Noted: Marifel T. Andes, Csee District Engineer Dates Of Publication: Dpwh Website: January 14, 2025 Philgeps Website: January 14, 2025
Closing Date24 Jan 2025
Tender AmountPHP 96.5 Million (USD 1.6 Million)
Public Service Delivery Tender
Aerospace and Defence
Canada
Details: Manitoba Reference Number: Mb-mbpb-10t-00030 Issuing Department: Procurement And Supply Chain Date Issued: 19/12/2024 Issued By: Gurjeet Kharay Telephone: 431-336-6413 The Government Of Manitoba (manitoba) Is Requesting Bid Submissions For The Supply & Delivery Of Ammunition On An "as And When" Requested Basis For The Period March 1, 2025, To February 28, 2026, With Two (2) Optional Of One (1) Year Extension. Note: For Information Or Item Clarification, If Required<(>,<)> Contact: Gurjeet Kharay Email: Bids@gov.mb.ca (enquiry Only) Please Contact The Individual Noted Above If Additional Information Or Clarification Is Required On The Following Items. Fob Destination Freight Prepaid To: Delivery Address: 1-1383 Whyte Ave., Winnipeg, Manitoba<(>,<)> R3e 1v7 Invoice Address: Conservation Officer Service Box 44- 14 Fultz Blvd Winnipeg, Mb R3y 0x7 Delivery In ___ Working Days Or ____weeks From Receipt Of The Order. General Terms & Conditions: This Rfq Is Subject To The Manitoba General Terms And Conditions: Https://www.gov.mb.ca/central/psc/pubs/form/mb_terms_conditions.pdf The Purchase Order To Be Issued To The Top Ranked Vendor(s) Is Subject To The Manitoba Purchase Order Terms And Conditions: Https://www.gov.mb. Ca/central/psc/pubs/form/manitoba_po_terms_conditions.pdf Submission Terms And Conditions: The Bid Must Be Signed By A Representative Of The Bidder With The Authority To Bind The Bidder. The Name And Title Of The Representative Signing The Bid Should Also Be Printed Below Their Signature. Vendor's E-mail Address: (if Available) ____________________ Quantity Clarification: Quantity Listed Contains 2 Or 3 Decimals. _________________________________________________________________________ Item Qty Description Delivery No. Date ======================================================== Item 10 01/04/2025 5,000.000 Case Gsin: N1300material: 41729 Ammunition, As Described Below Centre Fire Pistol Cartridges Training Ammunition, 9mm Parabellum Caliber Federal Brand. Bullet Weight 147 Grain Full Metal Jacket (fmj) Brass Case Factory Loads<(>,<)> Must Meet Saami Specs- No Reloads 50 Rounds/box. 1000 Rounds/case Please Indicate: Manufacturer Name, Brand Name And Product Information On The Proposed Product Offered As Follow: Manufacturer Name _________________ Brand Name ________________ Product / Style Number ________________ Bidder's Catalogue/reference Number (if Applicable) _________ Include Proposed Product Specification Sheet With Your Bid Submission. ======================================================== Item 20 01/04/2025 40.000 Case Gsin: N1300material: 41729 Ammunition, As Described Below Shotgun Ammunition 12 Gauge, 2 3/4 In Shotgun Cartridge, Slug (1 Oz) 5,000 Rounds Of 12 Gauge 2.75" Length 1 Oz Rifled Slug 1500-1650 Feet Per Second Velocity Please Indicate: Manufacturer Name, Brand Name And Product Information On The Proposed Product Offered As Follow: Manufacturer Name _________________ Brand Name ________________ Product / Style Number ________________ Bidder's Catalogue/reference Number (if Applicable) _________ Include Proposed Product Specification Sheet With Your Bid Submission. ======================================================== Item 30 01/04/2025 10.000 Case Gsin: N1300material: 41729 Ammunition, As Described Below Patrol Rifle Duty Ammunition 5,000 Rounds Of Premium Hunting Quality, Caliber In .308 Win Only<(>,<)> Bonded Bullet Construction. Ballistic Tip Or Hollow Point. Nickle Plated Casing Bullet Weight 160gr To 168gr Copper Jacketed With Bonded Lead Core Or Solid Copper Construction With Ballistic Tip. Please Indicate: Manufacturer Name, Brand Name And Product Information On The Proposed Product Offered As Follow: Manufacturer Name _________________ Brand Name ________________ Product / Style Number ________________ Bidder's Catalogue/reference Number (if Applicable) _________ Include Proposed Product Specification Sheet With Your Bid Submission. ======================================================== Item 40 01/04/2025 1.00 Each Gsin: N1300material: 99201010 Ammunition As Described Below: Assorted Ammunition-unispecified Assorted Ammunition, For The Purchase Of Unspecified Ammunition Provide Company Catalog And Discount Off Of List Catalog Pricing ________% ======================================================== Quotation Evaluation: Generally, The Lowest Overall Price Of An Acceptable Item(s) In Accordance With The Terms & Conditions Of The Rfq Will Be Awarded The Order. Quotations Will Also Be Evaluated Based On Suitability Of Unit Offered Compared To The End User#s Needs, Product Specifications, Delivery, Warranty, Price, Quality Of The Bidder's Performance In Past Awards And Any Other Terms & Conditions Indicated On This Rfq. Each Product Offered Will Be Considered Individually, However, The Intent Is To Award This Rfq To One Supplier In Total (if Possible And Economic To Manitoba) Therefore Bidders Should Quote On All Items If Possible. (economic Evaluation To Be At Manitoba#s Sole Discretion) Failure To Provide Adequate Information To Evaluate The Item Offered May Be Cause For Rejection Of Your Quote By The Manitoba Government (manitoba). Suitability Selection To Be At Manitoba's Sole Discretion. Quantity: The Quantity Shown Is Approximate And May Vary More Or Less It Should Be Noted That There Is No Guarantee Of Any Business. Any Unused Portion As Of The End Of The Contract Will Be Considered Cancelled. Quality / Acceptability All Products Supplied Are Subject To Inspection Prior To Acceptance. Manitoba Reserves The Right To Reject Any Products, After Final Inspection That Does Not Meet The Specification Requested. Product Offered: The Product Offered Must Meet The Requirements And Expectations For Its Intended Use. If It Is Your Intention To Offer An Item, Which Does Not Meet All The Specs/description As Outlined, Then You Must Indicate All Intended Deviations Or Changes On The Return Quote. Please Indicate: Manufacturers Name__________ Brand Name______________ Product / Style Number ________ Bidders Catalogue/reference Number (if Applicable) ___________ Note: If Any Of The Above Items/features Are Accessories That Are To Be Included And Installed Prior To Delivery. It Is The Supplier's Responsibility To Test All Systems To Ensure They Are Functioning Properly Prior To Delivery. Delivery Address: 1-1383 Whyte Ave., Winnipeg, Manitoba<(>,<)> R3e 1v7 Invoice Address: Conservation Officer Service Box 44- 14 Fultz Blvd Winnipeg, Mb R3y 0x7 (unit Prices Include All Necessary Charges E.g., Freight, Insurance, Handling Etc.) If Any Charges Are Not Included, Please Explain In Detail Any/all Charges That Will Be Extra To The Unit Prices Quoted And That Will Be Charged On The Invoice. Products/brands: Brand Names, Where Indicated, Are Shown For Reference Purposes Only And Are Not Intended As Endorsement Of A Particular Product. Authorized Vendor: Manitoba Reserves The Right, Prior To Any Contract Award, To Secure Evidence To Manitoba's Satisfaction That Any Bidder Is The Manufacturer, Or An Authorized Distributor, Dealer Or Retailer Of The Goods Offered And Is Authorized To Sell These Goods In Manitoba, Canada And Upon Request Will Provide Manitoba With Written Evidence Thereof. Warranty: Manufacturer's Warranty: State Warranty Of Units Offered (as Applicable To Manitoba's Use). (manitoba's Use Would Usually Be Considered Commercial Application Not Consumer) Product _________ Months Or _______ Years Labor _________ Months Or _______ Years Parts _________ Months Or _______ Years Please Note: During The Period Of The Warranty Offered, All Labor, Transportation, Parts, Surcharges Including Shipping And Brokerage Will Be Included. The Province Of Manitoba "will Not" Pay Additional Charges While The Item(s) Offered Are Under The Above Stated Warranty. Potential Costs Associated With The Location Of Warranty Service Might Be Used In The Evaluation Of This Quote. If The Warranty Offered Is The Vendor's Warranty In Combination With Or In Place Of The Manufacturer's Warranty Then A Complete Explanation Must Be Provided. Warranty Service/location: Is Warranty Service Provided On Site At Our Premises? Yes___ Or No____ If No, Indicate The Location The Unit Must Be Sent To For Manufacturer's Certified And/or Approved Warranty Service. Company Name_______________________ Location (city & Province) ______________ Do You Have A Toll Free Phone Number For Warranty Service? Yes______ Or No______ If Yes Please Provide: ________________________ After Warranty Service: Is After Warranty Service Provider The Same As Above? Yes ___ Or No_____ If No, Please Advice Company Name_______________________ Location (city & Province) ______________ Accounts Receivable Address: Due To Our Computerized Accounts Payable System Please Advise If Your Invoice Address (accounts Receivable) Is The Same As The Address For Orders / Quotes Shown Above Yes ____ Or No ______ If No Provide Complete Details I.e. Box #, Street Address, City, Province, Postal Code, Etc. _________________ Manitoba's Retail Sales Tax License: Are You Licensed By Manitoba Finance To Collect And Remit? Manitoba's Retail Sales Tax Yes_____ Or No_____ If No Disregard The Following Paragraph. Manitoba's Retail Sales Tax Is The Product(s) Offered Subject To Manitoba's Retail Sales Tax? Yes____ Or No _____ If The Quote Consists Of Both Taxable (t) And Non-taxable (nt) Items Please Indicate T Or Nt Opposite Each Item Offered. Payment Terms: Manitoba Will Consider Early Payment Terms. Manitoba's Standard Payment Term Is Net Thirty (30) Days. The Bidder Shall Specify Their Standard Invoice Term: _____________________________ Is There Any Applicable Discounts For Early Payment? Yes _____ No _____ Initial __________ If Yes, Please Specify: _____________________________________________________ Does Your Early Payment Clause Appear On Your Invoice? Yes _____ No _____ Initial __________ Your Quotation Reference # (if Applicable) _________. Proposed Delivery Address: 1-1383 Whyte Ave., Winnipeg, Manitoba<(>,<)> R3e 1v7 Tenders To Be Returned To: Merx Electronic Bid Submission Www.merx.com
Closing Soon18 Jan 2025
Tender AmountRefer Documents
Department Of Public Works And Highways - DPWH Tender
Civil And Construction...+1Civil Works Others
Philippines
Details: Description Invitation To Bid (ib) The Department Of Public Works And Highways (dpwh) Nueva Vizcaya First District Engineering Office, Through Its Bids And Awards Committee (bac), Invites Contractors To Submit Bids For The Following Contract/s: 1. Contract Id # : 25bi0049 Name Of Project : Convergence And Special Support Program – Bip – Flood Mitigation Structures Protecting Major/strategic Public Buildings/facilities – Rehabilitation Of Flood Control Structure Along Magat River, Magapuy Location Of Project : Bayombong, Nueva Vizcaya Indicative Approved Budget For The Contract (abc) : Php. 38,600,000.00 Project Description : Construction Of Slope Protection Works (steel Sheet Pile) With Embankment, Mattresses And Gabions Duration : 289 Calendar Days Cost Of Bid Documents : Php 25,000.00 Source Of Fund : Regular Infra Fy 2025 Pcab License Size Range : Medium ”a” 2. Contract Id # : 25bi0050 Name Of Project : Convergence And Special Support Program – Bip – Flood Mitigation Structures Protecting Major/strategic Public Buildings/facilities – Construction Of Flood Control And Drainage Structure Along Magat River, Tuao North Section Location Of Project : Bagabag, Nueva Vizcaya Indicative Approved Budget For The Contract (abc) : Php. 96,500,000.00 Project Description : Construction Of Slope Protection Works (steel Sheet Pile) With Embankment, Mattresses And Gabions Duration : 320 Calendar Days Cost Of Bid Documents : Php 50,000.00 Source Of Fund : Regular Infra Fy 2025 Pcab License Size Range : Medium ”a” 3. Contract Id # : 25bi0051 Name Of Project : Convergence And Special Support Program – Bip – Flood Mitigation Structures Protecting Major/strategic Public Buildings/facilities – Construction Of Flood Control Along Magat River, Sitio Kinacao, Brgy. Beretbet Location Of Project : Bagabag, Nueva Vizcaya Indicative Approved Budget For The Contract (abc) : Php. 38,600,000.00 Project Description : Construction Of Slope Protection Works (steel Sheet Pile) With Embankment, Mattresses And Gabions Duration : 289 Calendar Days Cost Of Bid Documents : Php 25,000.00 Source Of Fund : Regular Infra Fy 2025 Pcab License Size Range : Medium ”a” 4. Contract Id # : 25bi0052 Name Of Project : Organization Outcome 1: Ensure Safe And Reliable National Road System – Asset Preservation Program – Rehabilitation/reconstruction Of Roads With Slips, Slope Collapse And Landslide – Tertiary Roads – Papaya-malabing- Wangal-binugawan-tadji-runruno Rd., K0313+700 – 313+800 Location Of Project : Quezon, Nueva Vizcaya Indicative Approved Budget For The Contract (abc) : Php. 96,500,000.00 Project Description : Provision Of Slope Protection Works Duration : 312 Calendar Days Cost Of Bid Documents : Php 50,000.00 Source Of Fund : Regular Infra Fy 2025 Pcab License Size Range : Medium ”a” 5. Contract Id # : 25bi0053 Name Of Project : Organization Outcome 1: Ensure Safe And Reliable National Road System – Asset Preservation Program – Rehabilitation/reconstruction Of Roads With Slips, Slope Collapse And Landslide – Tertiary Roads – Papaya-malabing- Wangal-binugawan-tadji-runruno Rd., K0314+900 – 315+000 Location Of Project : Quezon, Nueva Vizcaya Indicative Approved Budget For The Contract (abc) : Php. 96,500,000.00 Project Description : Provision Of Slope Protection Works Duration : 312 Calendar Days Cost Of Bid Documents : Php 50,000.00 Source Of Fund : Regular Infra Fy 2025 Pcab License Size Range : Medium ”a” 6. Contract Id # : 25bi0054 Name Of Project : Organization Outcome 1: Ensure Safe And Reliable National Road System – Asset Preservation Program – Rehabilitation/reconstruction Of Roads With Slips, Slope Collapse And Landslide – Tertiary Roads – Bambang-kasibu- Quezon-solano Rd., K0320+100 – K0320+200 Location Of Project : Quezon, Nueva Vizcaya Indicative Approved Budget For The Contract (abc) : Php. 96,500,000.00 Project Description : Provision Of Slope Protection Works Duration : 312 Calendar Days Cost Of Bid Documents : Php 50,000.00 Source Of Fund : Regular Infra Fy 2025 Pcab License Size Range : Medium ”a” 7. Contract Id # : 25bi0055 Name Of Project : Organization Outcome 1: Ensure Safe And Reliable National Road System – Asset Preservation Program – Rehabilitation/reconstruction Of Roads With Slips, Slope Collapse And Landslide – Tertiary Roads – Bambang-kasibu- Quezon-solano Rd., K0322+900 – K0323+000 Location Of Project : Quezon, Nueva Vizcaya Indicative Approved Budget For The Contract (abc) : Php. 96,500,000.00 Project Description : Provision Of Slope Protection Works Duration : 312 Calendar Days Cost Of Bid Documents : Php 50,000.00 Source Of Fund : Regular Infra Fy 2025 Pcab License Size Range : Medium ”a” 8. Contract Id # : 25bi0056 Name Of Project : Organization Outcome 1: Ensure Safe And Reliable National Road System – Asset Preservation Program – Rehabilitation/reconstruction Of Roads With Slips, Slope Collapse And Landslide – Tertiary Roads – Bambang-kasibu- Quezon-solano Rd., K0326+850 – K0326+950 Location Of Project : Quezon, Nueva Vizcaya Indicative Approved Budget For The Contract (abc) : Php. 96,500,000.00 Project Description : Provision Of Slope Protection Works Duration : 312 Calendar Days Cost Of Bid Documents : Php 50,000.00 Source Of Fund : Regular Infra Fy 2025 Pcab License Size Range : Medium ”a” The Bac Is Conducting The Public Bidding For This Contract In Accordance With Republic Act No. 9184 And Its Implementing Rules And Regulations (irr). To Be Eligible To Bid For This Contract, A Contractor Must Meet The Following Major Requirements: (a) Filipino Citizen Or 75% Filipino-owned Partnership/corporation With Pcab License Size Range Medium “a” (b) Completion Of A Similar Contract Costing At Least 50% Of The Abc*, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. The Dpwh Will Use Non-discretionary "pass/fail" Criteria In The Eligibility Check. Bids Received In Excess Of The Abc Shall Be Automatically Rejected On Bid Opening. The Completeness And Correctness Of The Bid Will Be Determined During The Detailed Evaluation Of Bids. Contractors Shall Also Be Able To Meet The Post-qualification Criteria Of The Project As Stated In The Bidding Documents Of The Projects. Strict Application Of R.a. 9184 Of Post-qualification Of Bidders With Delayed On-going Contracts With The Dpwh, (department Order No. 127 Series 2018). Lf At The Time Of Post-qualification Procedure, The Bac Verifies That Any Of The Deficiencies Is Due To The Contractor's Fault Or Negligence Pursuant To 34.3(b)11)(c) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 (2016 Rirr Of Ra 9184), The Procuring Entity Shall Disqualify The Contractor From The Award Without Any Right To Reimburse Fees And Incidental Cost Paid For The Procurement Contract Subject Of The Bid".” The Schedule Of Key Procurement Activities For This Contract Is Shown Below: Activity Time Place 1. Issuance/downloading Of Bidding Documents January 15, 2025 To February 4, 2025 *hard Copies At Bac Secretariat, Dpwh-nv-1st. Deo, Bayombong, Nueva Vizcaya *downloadable From Free Of Charge From Dpwh Website Www.dpwh.gov.ph, Philgeps Website: Www.philgeps.gov.ph 2. Pre-bid Conference January 23, 2025 @9:00 A.m. Bac Bidding Room, Dpwh Nv 1st. Deo 3. Receipt By The Bac Of Bids Deadline: 9:00 Am On February 4, 2025 Bac Bidding Room, Dpwh Nv 1st. Deo 4. Opening Of Bids 9:01 Am On February 4, 2025 Bac Bidding Room, Dpwh Nv 1st. Deo Via Youtube Live @dpwhnuevavizcaya1stdeo Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_nuevavizcaya@dpwh.gov.ph For Electronic Submission On Or Before February 4, 2025 ; 9:00 A.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bidders Shall Pay The Bac An Applicable Fee Up To 9:00 A.m. Of February 4, 2025 For The Bidding Documents, Upon Securing Hard Copies Of The Documents. Bidders That Download The Documents From The Dpwh/ Phil-geps Website Shall Pay The Fee Upon Submission Of Their Bids. Bid Documents Should Be Printed In A4 Size Bond Paper. The Dpwh – Nueva Vizcaya First District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Any Requests For Additional Information Concerning This Bidding Shall Be Directed To The Following: Bac Secretariat Head: Bryan Neil G. Augusto Address: Dpwh-nv 1st. Deo Tel. No. (078) 362-0234 Email Address: Augusto.bryan_neil@dpwh.gov.ph Approved By: Eduardo B. Sibayan Asst. District Engineer Bac, Chairperson Noted: Marifel T. Andes, Csee District Engineer Dates Of Publication: Dpwh Website: January 14, 2025 Philgeps Website: January 14, 2025
Closing Date24 Jan 2025
Tender AmountPHP 96.5 Million (USD 1.6 Million)
CASIMIRO A YNARES SR MEMORIAL NATIONAL HIGH SCHOOL TAYTA Tender
Others
Corrigendum : Closing Date Modified
Philippines
Details: Description Request For Quotation Date: January 16, 2025 Rfq No.: 2025-01-01 Company/business Name: Address: Business/mayor’s Permit No.: Tin: Philgeps Registration Number (required): The Casimiro A. Ynares Sr. Memorial National High School Through Its Bids And Awards Committee (bac), Intends To Procure The “supply And Delivery Of Janitorial Supplies In Casimiro A. Ynares Sr. Mnhs” 52.1(b) (shopping) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184. Project Title Approved Budget For The Contract (abc) Supply And Delivery Of Janitorial Supplies In Casimiro A. Ynares Sr. Mnhs Php 300,000.00 Please Submit Your Duly Signed Quotation Addressed To The Bids And Awards Committee (bac) Chairperson And To The Given Address Below, On Or Before 12:00 Nn Of 21st Of January 2025, Subject To The Compliance With The Terms And Conditions Provided On This Request For Quotation (rfq) Elisa V. Regino Chairperson, Bids And Awards Committee – Goods And Services Casimiro A. Ynares Sr. Memorial National High School Cabrera Rd. Kaytikling, Barangay Dolores, Taytay, Rizal Contact Nos. (02) 8995-71-62 Note: Please Submit Quotation (hard Copy) And Required Documents In A Sealed And Signed Envelope. The Interested Service Provider Shall Also Submit The Following Documents As Stipulated In The Gppb Resolution No. 21-2017 Along With The Quotation On Or Before The Above Specified Deadline Of Submission Of Quotation: Alternative Mode Required Documents Remarks Statement Of Compliance (“comply Or Not Comply”) Shopping (section 52.1b) Latest Mayor’s/business Permit A Copy Of Your 2024 Mayor’s Or Business Permit Shall Be Submitted. Philgeps Registration Number A Copy Of Valid Philgeps Registration Shall Be Submitted As Proof. Additional: Certificate Of Registration From Bir And Tax Clearance Indicating The Line Of Business The Casimiro A. Ynares Sr. Memorial National High School – Bac Reserves The Right To Accept Or Reject Any Quotations / Proposals, And To Annul The Procurement Process And Reject All Quotations / Proposal At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Casimiro A. Ynares Sr. Memorial National High School – Bac Also Reserves The Right To Waive Any Required Formality In The Proposals Received And Select The Proposal Which It Determines To Be The Most Advantageous To The Government. For Any Clarification And Further Information, Please Refer To: Micaela L. Oblan Bac, Goods And Services, Secretariat Casimiro A. Ynares Sr. Memorial National High School Cabrera Rd. Kaytikling, Barangay Dolores, Taytay, Rizal Contact Nos. (02) 8995-71-62 Email Address: Casimiroaynaressrmnhs.308116@deped.gov.ph Elisa V. Regino Chairperson, Bac - Goods And Services Intructions: Note: Failure To Follow These Instructions Will Disqualify Your Entire Quotation: 1. Do Not Alter The Contents Of This Form In Any Way. 2. The Use Of This Rfq Is Highly Encouraged To Minimize Errors Or Omissions Of The Required Mandatory Provisions. In Case Of Any Changes, Bidders Must Use Or Refer To The Latest Version Of The Rfq, Except When The Latest Version Of The Rfq Only Pertains To Deadline Extension. If Another Form Is Used Other Than The Latest Rfq, The Quotation Shall Contain All The Mandatory Requirements/provisions Including Manifestation On The Agreement With The Terms And Conditions Below. In Case A Prospective Supplier/service Provider Submits A Filled-out Rfq With A Supporting Document (i.e., A Price Quotation In A Different Format), Both Documents Shall Be Considered Unless There Will Be Discrepancies. In This Case, Provisions In The Rfq Shall Prevail. 3. All Mandatory Technical Specifications (with Asterisk) Must Be Complied With. Failure To Comply With The Mandatory Requirements Shall Render The Quotation Ineligible/disqualified. 4. Quotations, Including Documentary Requirements, Received After The Deadline Shall Not Be Accepted. Terms And Conditions: 1. Bidders Shall Provide Correct And Accurate Information Required In This Form. 2. Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By You Or Any Of Your Duly Authorized Representative/s. 3. Price Quotation/s Must Be Valid For A Period Of Forty-five (45) Calendar Days From The Deadline Of Submission. 4. Price Quotation/s, To Be Denominated In Philippine Peso, Shall Include All Taxes, Duties, And/or Levies Payable. 5. Quotations Exceeding The Approved Budget For The Contract Shall Be Rejected. 6. In Case Of Two Or More Bidders Are Determined To Have Submitted The Lowest Calculated Quotation/lowest Calculated And Responsive Quotation, The Casimiro A. Ynares Sr. Memorial National High School Shall Adopt And Employ “draw Lots” As The Tie-breaking Method To Finally Determine The Single Winning Provider In Accordance With Gppb Circular 06-2005. 7. Award Of Contract Shall Be Made To The Lowest Quotation Which Complies With The Technical Specifications, Requirements And Other Terms And Conditions Stated Herein. 8. The Item/s Shall Be Delivered According To The Accepted Offer Of The Bidder. 9. Item/s Delivered Shall Be Inspected On The Scheduled Date And Time Of The Casimiro A. Ynares Sr. Memorial National High School. The Delivery Of The Item/s Shall Be Acknowledged Upon The Delivery To Confirm The Compliance With The Technical Specifications. 10. Payment Shall Be Made After Delivery And Upon The Submission Of The Required Supporting Documents Provided All Submitted Documents Are Complete And Correct, I.e., Order Slip And/or Billing Statement, By The Supplier, Contractor, Or Consultant. Our Government Servicing Bank, I.e., The Land Bank Of The Philippines, Shall Credit The Amount Due To The Identified Bank Account Of The Supplier, Contractor, Or Consultant Not Earlier Than Twenty- Four (24) Hours, But Not Later Than Forty-eight (48) Hours, Upon Receipt Of Our Advice. Please Note That The Corresponding Bank Transfer Fee, If Any, Shall Be Chargeable To The Account Of The Supplier, Contractor, Or Consultant. 11. Liquidated Damages Equivalent To One-tenth Of One Percent (0.1%) Of The Value Of The Goods Not Delivered Within The Prescribed Delivery Period Shall Be Imposed Per Day Of Delay. The Casimiro A. Ynares Sr. Memorial National High School May Terminate The Contract Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. 12. The Procuring Entity May Cancel Or Terminate The Contract At Any Time In Accordance With The Grounds Provided Under Ra No. 9184 And Its 2016 Revised Irr. 13. The Rfq, Purchase Order (po), And Other Related Documents For The Above-stated Procurement Projects Shall Be Deemed To Form Part Of The Contract. After Having Carefully Read And Accepted The Instructions And Terms And Conditions, I/we Submit Our Quotation/s For The Item/s As Follows: Supply And Delivery Of Janitorial Supplies In Casimiro A. Ynares Sr. Mnhs Minimum Technical Specifications Offered Technical Specifications/ Services Statement Of Compliance (“comply Or Not Comply”) Note: Non-compliance With The Minimum Required Specifications Shall Be Rejected. Technical Specifications 1. Bleaching Solution • 1liter • Quantity: 100 Bottles 2. Cleaner, Toilet Bowl And Urinal • 900ml-1000ml Cap • Quantity: 160 Bottles 3. Detergent Powder • 1kg • Quantity: 200 Packs 4. Dishwashing Liquid • 1liter • Quantity: 200 Bottles 5. Disinfectant Spray • Aerosol Type, 400-550 Grams • Quantity: 100 Cans 6. Air Freshener Spray • Aerosol Type • Flower Scent • Net Content: 600ml Min • Quantity: 100 Cans 7. Alcohol, Isopropyl • 1 Gallon • Quantity: 100 Bottles 8. Hand Soap • Liquid, 500ml • Quantity: 100 Bottles 9. Insecticide • Aerosol Type • Net Content: 600ml Min • Quantity: 100 Cans 10. Rags • All Cotton • 32 Pieces Per Kilogram Min • Quantity: 100 Bundles 11. Doormat Cloth • Rectangular In Size, Approx. 14" X 20" • Quantity: 100 Pcs 12. Toilet Tissue Paper • 2-plys Sheets • Quantity: 200 Packs 13. Toilet Tissue Paper, Interfolded Paper Towel • Quantity: 200 Packs 14. Trashbag • Large Size • Quantity: 400 Pieces 15. Trashbag • Xl Size • Quantity: 400 Pieces 16. Trashbag • Small Size • Quantity: 400 Pieces 17. Plastic Pail W/ Dipper • Size – Standard • Quantity – 50 Set 18. Broom, Stick (ting-ting) • Usable Length: 760mm Min • Quantity: 100 Pieces A. Delivery Requirement • Delivery Of The Supplies Must Be 5 Days Upon The Receipt Of Purchased Order Financial Offer Please Quote Your Best Offer For The Item/s Below. Please Do Not Leave Any Blank Items. Indicate “0” If Item Being Offered Is For Free. Supply And Delivery Of Janitorial Supplies In Casimiro A. Ynares Sr. Mnhs Approved Budget For The Contract Offered Quotation Php 300,000.00 In Words: In Figures: Note: Please Attach The Breakdown Of The Offered Proposal Inclusive Of Vat Which Will Be The Basis For The Computation Of Unit Prices Signature Over Printed Name Position/designation Office Telephone/fax/mobile Nos. Email Address/es
Closing Soon21 Jan 2025
Tender AmountPHP 300 K (USD 5.1 K)
Research Institute For Tropical Medicine, Doh Tender
Philippines
Details: Description Request For Quotation Mode Of Procurement: Small Value Procurement Date: _____________ Pr No.: _____________ Rfq No.: _____________ Company/business Name: Complete Office Address: Business/mayor’s Permit No: Tin: The Research Institute For Tropical Medicine – Department Of Health, Through Its Bids And Awards Committee (bac), Intends To Procure The Below Mentioned Items Through The Above-mentioned Mode Of Procurement Based On The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184. Please Quote Your Best Offer For The Item/s Described Herein, Subject To The Terms And Conditions Provided On This Request For Quotation (rfq). Submit Your Quotation Duly Signed By You, Or Your Duly Authorized Representative Within Five (5) Days Which Shall Be Addressed To The Ritm Bids And Awards Committee. A)the Following Documents Are Required To Be Submitted Along With Your Formal Quotation: Documentary Requirement Remarks Valid And Current Mayor’s/business Permit In Case Not Yet Available, You May Submit Your Expired Mayor’s Or Business Permit With The Official Receipt Of Renewal Application. However, A Copy Of The Latest Mayor’s Or Business Permit Shall Be Required To Be Submitted After Award Of Contract But Before Payment. Valid And Current Certificate Of Platinum Membership With Valid Annex “a” May Be Submitted In Lieu Of The Mayor’s/business Permit Philgeps Registration/membership Bir Form 2303 Company Name Registered In Sec/dti/cda Must Be The Same Registered Name In Bir Form 2303. B)the Following Documents Shall Be Submitted By The Bidder Before The Issuance Of Notice Of Award: Documentary Requirement Remarks Duly Notarized Revised Omnibus Sworn Statement (10 Provisions) With Latest Rules On Notarial Practice Applicable For: Np-svp With Abcs Above P50,000.00 And Np-ec With Abcs Above P500,000.00 Note: Othe Pr # Shall Be Reflected In The Omnibus Sworn Statement Oone (1) Original Copy Must Be Submitted Othe Issuance And Notarial Date Of The Omnibus Sworn Statement Shall Be The Same/after The Issuance And Notarial Date Of The Authority Of The Signatory. Othe Authorized Representative Declared In The Omnibus Sworn Statement Shall Be In Congruent With The Submitted Authority Of The Signatory. Authority Of The Signatory Applicable For: Np-svp With Abcs Above P50,000.00 And Np-ec With Abcs Above P500,000.00 for Sole Proprietorship – Duly Notarized Special Power Of Attorney, If Signatory Is Other Than The Owner for Corporation – Duly Notarized Secretary’s Certificate for Partnership, Cooperative, Or Joint Venture – Duly Notarized Board/partnership Resolution, Whichever Is Applicable Note: Othe Pr # Shall Be Reflected In The Authority Of The Signatory Oone (1) Original Copy Must Be Submitted Othe Issuance And Notarial Date Of The Authority Of The Signatory Shall Be The Same/shall Come First Before The Issuance And Notarial Date Of The Omnibus Sworn Statement. Note: Incomplete Submission Of The Required Documents Will Be A Ground For Disqualification. For Any Clarification, You May Contact Us At The Contact Information Provided: Mae Marie E. Hernandez Bac Secretariat Head (632) 8807-2628 To 32 Loc. 210 And/or 240 E-mail Address: Procurement@ritm.gov.ph / Procurement_02@ritm.gov.ph Website: Www.ritm.gov.ph Instructions: Note: Failure To Follow These Instructions Will Disqualify Your Entire Quotation. (1)do Not Alter The Contents Of This Form In Any Way. (2)the Use Of This Rfq Is Highly Encouraged To Minimize Errors Or Omissions Of The Required Mandatory Provisions. If Another Form Is Used Other Than The Latest Rfq, The Quotation Shall Contain All The Mandatory Requirements/provisions Including Manifestation On The Agreement With The Terms And Conditions Below. (3)all Technical Specifications Must Be Complied With. Failure To Comply With The Mandatory Requirements Shall Render The Quotation Ineligible/disqualified. (4)quotations May Be Submitted Through Electronic Mail At: Procurement@ritm.gov.ph / Procurement_02@ritm.gov.ph. (5)quotations, Including Documentary Requirements, Received After The Deadline Shall Not Be Accepted. For Quotations Submitted Via Electronic Mail, The Date And Time Of Receipt Indicated In The Email Shall Be Considered. Terms And Conditions: bidders Shall Provide Correct And Accurate Information Required In This Form. any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By You Or Any Of Your Duly Authorized Representative/s. price Quotation/s, To Be Denominated In Philippine Peso, Shall Include All Taxes, Duties, And/or Levies Payable – If Applicable. quotations Exceeding The Approved Budget For The Contract Shall Be Rejected. in Case Of Two Or More Bidders Are Determined To Have Submitted The Lowest Calculated Quotation/lowest Calculated And Responsive Quotation, The Ritm-bac Shall Adopt And Employ “draw Lots” As The Tie-breaking Method To Finally Determine The Single Winning Provider In Accordance With Gppb Circular 06-2005. award Of Contract Shall Be Made To The Lowest Quotation Which Complies With The Technical Specifications, Requirements And Other Terms And Conditions Stated Herein. payment Shall Be Made After Delivery And Upon The Submission Of The Required Supporting Documents, I.e., Order Slip And/or Billing Statement, By The Supplier, Contractor, Or Consultant. Our Government Servicing Bank, I.e., The Land Bank Of The Philippines, Shall Credit The Amount Due To The Identified Bank Account Of The Supplier, Contractor, Or Consultant Not Earlier Than Twenty-four (24) Hours, But Not Later Than Forty-eight (48) Hours, Upon Receipt Of Our Advice. Please Note That The Corresponding Bank Transfer Fee, If Any, Shall Be Chargeable To The Account Of The Supplier, Contractor, Or Consultant. liquidated Damages Equivalent To One-tenth Of One Percent (0.1%) Of The Value Of The Goods Not Delivered Within The Prescribed Delivery Period Shall Be Imposed Per Day Of Delay. Ritm May Terminate The Contract Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, Without Prejudice To Other Courses Of Action And Remedies Available To The Procuring Entity. Technical Offer/proposal: After Having Carefully Read And Accepted The Instructions And Terms And Conditions, I/we Submit Our Technical Proposals/quotations For The Item/s As Follows: Item # Qty/ Unit Item Description Supplier’s Compliance (indicate Brand And/or Model, Including Complete Specifications To Be Offered - Applicable) 1 3/box Agar, Haemophilus Test Medium (htm), Dehydrated Powder (500gram/bottle) With Compatible Haemophilus Test Supplement Packaged Separately From Basal Hemophilus Test Agar Medium, 10 Vial/box Expiration Date: Shall Not Be Less Than Two (2) Years From The Date Of The Actual Delivery *item Should Have Passed The Evaluation Result, Quality Assessment, And Quality Validation/verification Of The End-user Or Should Have Met The Acceptability Criteria Necessary For Laboratory Inter-comparability Of Results, Whichever Is Applicable. General Requirements: • Product Brochure/product Information (if Applicable) •certificate Of Analysis, Quality Control And Conformity With Expiry Date And Batch Number 2 1/pack Agar, Perfringens Agar Base (same Brand As Supplement), 5 Vials/pack Expiration Date: Shall Not Be Less Than Two (2) Years From The Date Of The Actual Delivery. *item Should Have Passed The Evaluation Result, Quality Assessment, And Quality Validation/verification Of The End-user Or Should Have Met The Acceptability Criteria Necessary For Laboratory Inter-comparability Of Results, Whichever Is Applicable. General Requirements: • Product Brochure/product Information (if Applicable) •certificate Of Analysis, Quality Control And Conformity With Expiry Date And Batch Number Financial Offer/proposal: Please Quote Your Best Offer For The Item/s Below. Please Do Not Leave Any Blank Items. Indicate “0” If Item Being Offered Is For Free: Item # Qty/ Unit Item Description Abc Price Proposal Unit Cost Price Proposal Total Cost 1 3/box Agar, Haemophilus Test Medium (htm), Dehydrated Powder (500gram/bottle) With Compatible Haemophilus Test Supplement Packaged Separately From Basal Hemophilus Test Agar Medium, 10 Vial/box Expiration Date: Shall Not Be Less Than Two (2) Years From The Date Of The Actual Delivery *item Should Have Passed The Evaluation Result, Quality Assessment, And Quality Validation/verification Of The End-user Or Should Have Met The Acceptability Criteria Necessary For Laboratory Inter-comparability Of Results, Whichever Is Applicable. General Requirements: •product Brochure/product Information (if Applicable) •certificate Of Analysis, Quality Control And Conformity With Expiry Date And Batch Number 86,630.01 2 1/pack Agar, Perfringens Agar Base (same Brand As Supplement), 5 Vials/pack Expiration Date: Shall Not Be Less Than Two (2) Years From The Date Of The Actual Delivery. *item Should Have Passed The Evaluation Result, Quality Assessment, And Quality Validation/verification Of The End-user Or Should Have Met The Acceptability Criteria Necessary For Laboratory Inter-comparability Of Results, Whichever Is Applicable. General Requirements: •product Brochure/product Information (if Applicable) •certificate Of Analysis, Quality Control And Conformity With Expiry Date And Batch Number 45,091.00 Delivery Period: Ninety (90) Government Working Days Total Offered Quotation In Words: ______________ In Figures: ______________ Price Validity: ________________ Payment Terms: Thirty (30) Calendar Days Payment Details: Banking Institution: _________________________________________________ Account Number: __________________________________________________ Account Name: _________________________________________________ Branch: _________________________________________________ Note: Only The Actual Amount Of The Accepted Items Shall Be Paid. ___________________________ Signature Over Printed Name Of Authorized Representative ___________________________ Position/designation ___________________________ Office Telephone/fax/mobile Nos. ___________________________ Email Address/es
Closing Soon20 Jan 2025
Tender AmountPHP 131.7 K (USD 2.2 K)
DEPT OF THE NAVY USA Tender
Others
United States
Description: Item Unique Identification And Valuation (jan 2023)|19|0001|1hm 4730 016997794 X2 Ell 90 Lr Bw.sch 80||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|mil-i-45208|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a||||||
inspection System Program Plans, Or Premanufacturing Or Test Procedures|1|45|
federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12|||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
small Business Program Representations (feb 2024)|4|||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332919|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
a Material Irpod Is Available At The Bpmi Site. Vendor Review Of The Irpod Is Mandatory.
unless Otherwise Specified, Pricing For This Quotation Is Valid For 60 Daysafter The Closing Date As Indicated On The Quotation. Please Specify (if Otherthan 60 Days) ______________ Days. If You Are Submitting Your Quote Via Emailor Neco, Please Specify The Number
Of Days Pricing Is Valid.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein.
the Recommended Method For Roti Submittals Is Via Wawf Or An Alternative High Quality Electronic Means. (i.e. Fax Or E-mail Your Post Award P.o.c Listed Above) A Dedicated Roti Fax Has Been Added For Your Submittal Convenience. Fax Number (717) 605-8054.
\
1. Scope
1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence.
2. Applicable Documents
2.1 Applicable Documents;
technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At
(https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To
the Award.
this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator.
2.2 Not Releasable To Foreign Nationals (noforn) Distribution Statement - Drawings, Specification, Or Related Technical Documents As Cited In The Irpod Are Subject To Special Export Controls And Each Transmittal To Foreign Govern Ments Or Foreign Nationals May
be Made Only With Prior Approval Of The Naval Sea Systems Command.
3. Requirements
3.1 Navsup Wss-mech Code N94 Additional Technical Documentation
order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004
a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of
any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows:
1. Amendments To The Purchase Order/contract
2. Schedule Of Supplies Of The Purchase Order/contract.
3. Terms And Conditions Of The Purchase Order/contract.
4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable.
5. Any Invoked Standard Technical Requirements (strs).
6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable.
7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable.
b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents:
1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval
for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided.
2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later.
c. Use Of Document Revisions In Their Entirety:
1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document).
d. Vendor Waiver/deviations On Critical Contracts.
1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected.
2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation
is Submitted Or Prior To Manufacture.
3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With
your Request.
4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or
replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation.
5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided.
6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within
five Working Days After Receipt.
e. Exclusion Of Mercury
1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract.
4. Quality Assurance
4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod).
the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein.
records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract.
5. Packaging
5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts
applies.
(1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing,
and Marking.
requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc.
(a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States,
"components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)".
(2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply:
(a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other
requirements Identified Within The Irpod.
the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods.
(b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements
for The Use Of Green Poly Bags, Then They Are Required And Take Precedence.
(4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From:
contracting Officer
navsup Wss-mech
code N943
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On
post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document.
2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents.
6.2 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s)
Which Are Part Of The Total Requirement Of The Contract/purchase
Order.
block C: Is The Category Of Data Required, Tdp Is Defined
In Mil-t-31000. Tm Is Defined In Part 1x, Section B
Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's
Included In Our Solicitations Meet The Requirement Of Tdp As
Navsup-wss Does Not Regularly Purchase Only Technical Manuals
Without Purchasing Hardware And Related Tdp Software. Therefore,
Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item
Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number,
Invitation For Bid Number Or Another Number For Tracking And
Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The
Individual Who Prepared The Dd Form 1423 And Included The
Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content
And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If
The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual
Technical Manual Contract Requirements Number. In The Event
The Dd Form 1423 Is Requiring A Technical Manual The Numbered
Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement
Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval,
Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And
Acceptance Of The Deliverable Item. The Definition Of The
Codes Is As Follows:
Dd Form 250 Code Inspection Acceptance
Ss (1) (2)
Dd (3) (4)
Sd (1) (4)
Ds (3) (5)
Lt (6) (7)
No (8) (8)
Xx (9) (9)
(1) Inspection At Source.
(2) Acceptance At Source.
(3) No Inspection Performed At Source. Final Inspection
Performance At Destination.
(4) Acceptance At Destination.
(5) Acceptance At Source. Acceptance Based On Written
Approval From The Contract Officer.
(6) Letter Of Transmittal Only. Lt Should Not Be Used When
Inspection Is Required. The Data Is Sent By The
Contractor Directly To The Personnel Listed In Block 14
Of The Dd Form 1423. Lt Is Used When The Contracting
Agency Does Not Desire To Have A Dd Form 250 For Each
And Every Piece Of Data Developed By The Contractor.
The Only Other Authorized Use Of Lt Is The Special
Case Where The Contracting Agency Does Not Desire To
Have Separate Dd Forms 250 But Desires To Have A
Government Quality Assurance Representative Perform
Inspection. The Government Quality Assurance
Representative Shall Be Listed On The Distribution
In Block 14 And Requested To Provide Comments Via
The Quality Assurance Letter Of Inspection.
Use Of The Symbol Lt Is Not Authorized For Data Comprising
Final Delivery Of Technical Data Package Of For Technical
Manuals. (lt May, However, Be Used For Delivery Of
Preliminary Tdp's Or Tm's).
(7) As Specified In Block 8 Of The Dd Form 1423.
(8) No Inspection Or Acceptance Required. No Dd Form 250 Or
Letter Of Transmittal Required.
Use Of The Symbol No Is Not Authorized For Data Comprising
Technical Data Packages Or For Technical Manuals.
(9) Inspection And Acceptance Requirements Specified Elsewhere
In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring
Specific Advanced Written Approval Prior To Distribution Of
The Final Data Item Will Be Identified By Placing An "a"
In This Field. This Data Item Requires Submission Of A
Preliminary Draft Prior To Publication Of A Final Document.
When A Preliminary Draft Is Required, Block 16 Of The Dd
Form 1423 Will Show Length Of Time Required For Government
Approval/disapproval And Subsequent Turn-around Time For The
Contractor To Resubmit The Data After Government
Approval/disapproval Has Been Issued. Block 16 Will Also
Indicate The Extent Of The Approval Requirements, E.g.,
Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The
Government Can Circulate The Deliverable Item. The Definition
Of Codes A, B, C, D, E, Or F Is As Follows:
A. Distribution Of The Item Is Unrestricted.
B. Distribution Of The Item Is Limited To Agencies Only.
C. Distribution Of The Item Is Limited To Contractors With
A Cage Code And Have A Dd Form 2345 On File With The
Dla Logistics Information Services (dlis) Battle Creek,
Mich. Or Government Activities.
D. Distribution Of The Item Is Limited To Dod Activities
And Dod Contractors Only.
E. Distribution Of The Item Is Limited To Dod Components
Only.
F. Distribution Of The Item Is Restricted From Foreign
Nations And Foreign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To
Be Delivered To The Government. The Abbreviations And
Their Meaning.
Annly Annually
Asgen As Generated
Asreq As Required
Bi-mo Every Two Months
Bi-we Every Two Weeks
Daily Daily
Dfdel Deferred Delivery
Mthly Monthly
One/r One Time With Revisions
Qrtly Quarterly
Semia Every Six Months
Wekly Weekly
Xtime Number Of Times To Be Submitted
(1time, 2times...9times)
Use Of These Codes Requires Further Explanation In Block 16
To Provide The Contractor With Guidance Necessary To Accurately
Price The Deliverable Data Item.
Other Abbreviations Not Appearing On The Above List May On
Occasion Be Used In Block 10 Of The Dd Form 1423. When Other
Abbreviations Are Used They Will Be Fully Explained In Block 16
Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day
Format, The Deliverable Item Is To Be Received By The
Requiring Office Cited In Block 6 Of The Dd Form 1423
For An Item With A Block 10 Entry Indication A Single
Delivery. If The Item Is To Be Submitted Multiple
Times, The Number Stated Is The Number Of Calendar Days
After The Frequency Cited In Block 10 The Item Is To Be
Received By The Requiring Office Cited In Block 6 Of The
Dd Form 1423. On Occasion The Deliverable Item Will Be
Required To Be Submitted Prior To The End Of The Frequency
Cited In Block 6. In That Event The Requirement Will Be
Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To
The Requiring Office (block 4) Expressed In
Year/month/day Format. The Abbreviations And Their
Meaning Are As Follows:
Asgen As Generated
Asreq As Required
Dac Days After Contract Date
Dfdel Deferred Delivery
Eoc End Of Contract
Eom End Of Month
Eoq End Of Quarter
Specific Instructions For These Requirements Will Be Provided In
Block 16. If The Deliverable Item Is Constrained By A Specific
Event Or Milestone The Constraint Will Be Fully Explained In Block 16
Of The Dd Form 1423. "as Generated", "as Required", And "deferred
Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After
The Initial Submission. Subsequent Submission Is Only Used To
Indicate The Specific Time Period. The Data Is Required When
Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is
Required. This Does Not Apply To Resubmission Of A Deliverable
Item That Has Been Reviewed By The Requiring Office And Determined
To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To
Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full
Name, Address (including Code) Will Be Specified. That Specific
Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To
Be Submitted. When Final "repro" Copies Are To Be Submitted
Block 16 Will Clarify The Type Of Repro Copies Required.
(e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required
By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information
Blocks 1 Through 15. This Block Is Also The Only Area Used To
Tailor The Document Listed In Block 4. Only Deletions To The
Minimum Requirements Stated In The Document In Block 4 Are
Allowed. Block 16 May Also Be Used To Specify The Medium For
Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offeror Is To Enter The
Appropriate Price Group. The Price Groups Are Defined As Follows:
A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This
Type Of Data To Perform The Rest Of The Contract. Price
Would Be Based On Identifiable Direct Costs, Overhead, General
And Administrative (g&a) And Profit.
B. Group Ii - Data Essential To Contract Performance Which Must Be
Reworked Or Amended To Conform To Government Requirements.
The Price For Data In This Group Would Be Based On The Direct
Cost To Convert The Original Data To Meet Government Needs And
To Deliver It, Plus Allocable Overhead, G&a And Profit.
C. Group Iii - Data Which The Contractor Must Develop For His Own
Use And Which Requires No Substantial Change To Conform To
Government Requirements Regarding Depth Of Content, Format,
Frequency Of Submittal, Preparation, And Quality Of Data. Only
The Costs Of Reproducing, Handling And Delivery, Plus Overhead,
G&a And Profit, Are Considered In Pricing Data In This Group.
D. Group Iv - Data Which The Contractor Has Developed As Part
Of His Commercial Business. Not Much Of This Data Is Required
And The Cost Is Insignificant. The Item Should Normally
Be Coded "no Charge." An Example Is A Brochure Or Brief Manual
Developed For Commercial Application Which Will Be Acquired
In Small Quantities, And The Added Cost Is Too Small To Justify
The Expense Of Computing The Charge That Otherwise Would Go
With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total
Price Which Is Estimated To Be Attributable To The Production
Or Development For The Government Of That Item Of Data. The
Entry "n/c" For "no Charge" Is Acceptable.
6.3 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
date Of First Submission=eoc
submit To Navsup-wss, Code N9433 For Review, A Complete Package Of All Applicable Vendor Certified Reports Of Test And Inspection Per Di-qcic-8872(latest Rev) See (individual Repair Parts Ordering Data) Irpod For Individual Documentsrequired.
the Package Will Be Submitted Per The Contract Delivery Schedule, And Authorization To Ship Material Must Be Obtained From The Pco.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8872s Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Roti Package To Be Iaw Did Di-qcic-8872(latest Rev).
date Of First Submission=045 Dac
submit For Approval One Package (iaw Di-qcic-8871) Of All Applicable Procedure, Drawing And Other Pre-manufacturing Submittals, Listed On The Individual Repair Part Ordering Data (irpod) Document(s) And Detailed In The Cited Specification, Within 45 Days After
contract Award To The Contracting Officer (navsup-wss Code N9433). See Irpod For Individual Documents Required.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8871 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Procedure Package To Be Iaw Did Di-qcic-8871(latest Rev).
Closing Soon21 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
United States
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|mil-i-45208|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a||||||
inspection System Program Plans, Or Premanufacturing Or Test Procedures|1|45|
federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12|||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13|314999|550||||||||||||
annual Representations And Certifications (may 2024)|13|314999|550||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
a Material Irpod Is Available At The Bpmi Site. Vendor Review Of The Irpod Is Mandatory.
unless Otherwise Specified, Pricing For This Quotation Is Valid For 60 Days After The Closing Date As Indicated On The Quotation. Please Specify (if Other Than 60 Days) ______________ Days. If You Are Submitting Your Quote Via Email Or Neco, Please Specify The
number Of Days Pricing Is Valid.
All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein.
the Following Applies If Reports Of Test And Inspection (roti) Are Required:
the Recommended Method For Roti Submittals Is Via Wawf Or An Alternative High Quality Electronic Means (ie: Fax Or Email Your Post Award Poc Listed Above). A Dedicated Roti Fax Has Been Added For Your Submittal Convenience.
mark Packaging Label With The Nomenclature Cited On The Irpod.
the Requirements To Comply With Mil-std-45662 Apply To This Item. Addition Tomil-std-129 Markings:mil-i-24244 Markings Apply.
also, Mark Each Unit, Intermediate & Shipping Container Clearly With: "insulation Free Of Asbestos And Ceramic(refractory) Fibers.
1. Scope
1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence.
2. Applicable Documents
2.1 Applicable Documents;
technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At
(https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To
the Award.
this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator.
2.2 Not Releasable To Foreign Nationals (noforn) Distribution Statement - Drawings, Specification, Or Related Technical Documents As Cited In The Irpod Are Subject To Special Export Controls And Each Transmittal To Foreign Govern Ments Or Foreign Nationals May
be Made Only With Prior Approval Of The Naval Sea Systems Command.
3. Requirements
3.1 Navsup Wss-mech Code N94 Additional Technical Documentation
order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004
a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of
any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows:
1. Amendments To The Purchase Order/contract
2. Schedule Of Supplies Of The Purchase Order/contract.
3. Terms And Conditions Of The Purchase Order/contract.
4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable.
5. Any Invoked Standard Technical Requirements (strs).
6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable.
7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable.
b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents:
1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval
for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided.
2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later.
c. Use Of Document Revisions In Their Entirety:
1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document).
d. Vendor Waiver/deviations On Critical Contracts.
1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected.
2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation
is Submitted Or Prior To Manufacture.
3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With
your Request.
4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or
replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation.
5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided.
6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within
five Working Days After Receipt.
e. Exclusion Of Mercury
1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract.
4. Quality Assurance
4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod).
the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein.
records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract.
5. Packaging
5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts
applies.
(1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing,
and Marking.
requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc.
(a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States,
"components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)".
(2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply:
(a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other
requirements Identified Within The Irpod.
the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods.
(b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements
for The Use Of Green Poly Bags, Then They Are Required And Take Precedence.
(4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From:
contracting Officer
navsup Wss-mech
code N943
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On
post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document.
2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents.
6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
6.3 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s)
Which Are Part Of The Total Requirement Of The Contract/purchase
Order.
block C: Is The Category Of Data Required, Tdp Is Defined
In Mil-t-31000. Tm Is Defined In Part 1x, Section B
Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's
Included In Our Solicitations Meet The Requirement Of Tdp As
Navsup-wss Does Not Regularly Purchase Only Technical Manuals
Without Purchasing Hardware And Related Tdp Software. Therefore,
Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item
Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number,
Invitation For Bid Number Or Another Number For Tracking And
Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The
Individual Who Prepared The Dd Form 1423 And Included The
Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content
And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If
The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual
Technical Manual Contract Requirements Number. In The Event
The Dd Form 1423 Is Requiring A Technical Manual The Numbered
Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement
Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval,
Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And
Acceptance Of The Deliverable Item. The Definition Of The
Codes Is As Follows:
Dd Form 250 Code Inspection Acceptance
Ss (1) (2)
Dd (3) (4)
Sd (1) (4)
Ds (3) (5)
Lt (6) (7)
No (8) (8)
Xx (9) (9)
(1) Inspection At Source.
(2) Acceptance At Source.
(3) No Inspection Performed At Source. Final Inspection
Performance At Destination.
(4) Acceptance At Destination.
(5) Acceptance At Source. Acceptance Based On Written
Approval From The Contract Officer.
(6) Letter Of Transmittal Only. Lt Should Not Be Used When
Inspection Is Required. The Data Is Sent By The
Contractor Directly To The Personnel Listed In Block 14
Of The Dd Form 1423. Lt Is Used When The Contracting
Agency Does Not Desire To Have A Dd Form 250 For Each
And Every Piece Of Data Developed By The Contractor.
The Only Other Authorized Use Of Lt Is The Special
Case Where The Contracting Agency Does Not Desire To
Have Separate Dd Forms 250 But Desires To Have A
Government Quality Assurance Representative Perform
Inspection. The Government Quality Assurance
Representative Shall Be Listed On The Distribution
In Block 14 And Requested To Provide Comments Via
The Quality Assurance Letter Of Inspection.
Use Of The Symbol Lt Is Not Authorized For Data Comprising
Final Delivery Of Technical Data Package Of For Technical
Manuals. (lt May, However, Be Used For Delivery Of
Preliminary Tdp's Or Tm's).
(7) As Specified In Block 8 Of The Dd Form 1423.
(8) No Inspection Or Acceptance Required. No Dd Form 250 Or
Letter Of Transmittal Required.
Use Of The Symbol No Is Not Authorized For Data Comprising
Technical Data Packages Or For Technical Manuals.
(9) Inspection And Acceptance Requirements Specified Elsewhere
In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring
Specific Advanced Written Approval Prior To Distribution Of
The Final Data Item Will Be Identified By Placing An "a"
In This Field. This Data Item Requires Submission Of A
Preliminary Draft Prior To Publication Of A Final Document.
When A Preliminary Draft Is Required, Block 16 Of The Dd
Form 1423 Will Show Length Of Time Required For Government
Approval/disapproval And Subsequent Turn-around Time For The
Contractor To Resubmit The Data After Government
Approval/disapproval Has Been Issued. Block 16 Will Also
Indicate The Extent Of The Approval Requirements, E.g.,
Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The
Government Can Circulate The Deliverable Item. The Definition
Of Codes A, B, C, D, E, Or F Is As Follows:
A. Distribution Of The Item Is Unrestricted.
B. Distribution Of The Item Is Limited To Agencies Only.
C. Distribution Of The Item Is Limited To Contractors With
A Cage Code And Have A Dd Form 2345 On File With The
Dla Logistics Information Services (dlis) Battle Creek,
Mich. Or Government Activities.
D. Distribution Of The Item Is Limited To Dod Activities
And Dod Contractors Only.
E. Distribution Of The Item Is Limited To Dod Components
Only.
F. Distribution Of The Item Is Restricted From Foreign
Nations And Foreign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To
Be Delivered To The Government. The Abbreviations And
Their Meaning.
Annly Annually
Asgen As Generated
Asreq As Required
Bi-mo Every Two Months
Bi-we Every Two Weeks
Daily Daily
Dfdel Deferred Delivery
Mthly Monthly
One/r One Time With Revisions
Qrtly Quarterly
Semia Every Six Months
Wekly Weekly
Xtime Number Of Times To Be Submitted
(1time, 2times...9times)
Use Of These Codes Requires Further Explanation In Block 16
To Provide The Contractor With Guidance Necessary To Accurately
Price The Deliverable Data Item.
Other Abbreviations Not Appearing On The Above List May On
Occasion Be Used In Block 10 Of The Dd Form 1423. When Other
Abbreviations Are Used They Will Be Fully Explained In Block 16
Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day
Format, The Deliverable Item Is To Be Received By The
Requiring Office Cited In Block 6 Of The Dd Form 1423
For An Item With A Block 10 Entry Indication A Single
Delivery. If The Item Is To Be Submitted Multiple
Times, The Number Stated Is The Number Of Calendar Days
After The Frequency Cited In Block 10 The Item Is To Be
Received By The Requiring Office Cited In Block 6 Of The
Dd Form 1423. On Occasion The Deliverable Item Will Be
Required To Be Submitted Prior To The End Of The Frequency
Cited In Block 6. In That Event The Requirement Will Be
Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To
The Requiring Office (block 4) Expressed In
Year/month/day Format. The Abbreviations And Their
Meaning Are As Follows:
Asgen As Generated
Asreq As Required
Dac Days After Contract Date
Dfdel Deferred Delivery
Eoc End Of Contract
Eom End Of Month
Eoq End Of Quarter
Specific Instructions For These Requirements Will Be Provided In
Block 16. If The Deliverable Item Is Constrained By A Specific
Event Or Milestone The Constraint Will Be Fully Explained In Block 16
Of The Dd Form 1423. "as Generated", "as Required", And "deferred
Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After
The Initial Submission. Subsequent Submission Is Only Used To
Indicate The Specific Time Period. The Data Is Required When
Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is
Required. This Does Not Apply To Resubmission Of A Deliverable
Item That Has Been Reviewed By The Requiring Office And Determined
To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To
Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full
Name, Address (including Code) Will Be Specified. That Specific
Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To
Be Submitted. When Final "repro" Copies Are To Be Submitted
Block 16 Will Clarify The Type Of Repro Copies Required.
(e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required
By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information
Blocks 1 Through 15. This Block Is Also The Only Area Used To
Tailor The Document Listed In Block 4. Only Deletions To The
Minimum Requirements Stated In The Document In Block 4 Are
Allowed. Block 16 May Also Be Used To Specify The Medium For
Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offeror Is To Enter The
Appropriate Price Group. The Price Groups Are Defined As Follows:
A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This
Type Of Data To Perform The Rest Of The Contract. Price
Would Be Based On Identifiable Direct Costs, Overhead, General
And Administrative (g&a) And Profit.
B. Group Ii - Data Essential To Contract Performance Which Must Be
Reworked Or Amended To Conform To Government Requirements.
The Price For Data In This Group Would Be Based On The Direct
Cost To Convert The Original Data To Meet Government Needs And
To Deliver It, Plus Allocable Overhead, G&a And Profit.
C. Group Iii - Data Which The Contractor Must Develop For His Own
Use And Which Requires No Substantial Change To Conform To
Government Requirements Regarding Depth Of Content, Format,
Frequency Of Submittal, Preparation, And Quality Of Data. Only
The Costs Of Reproducing, Handling And Delivery, Plus Overhead,
G&a And Profit, Are Considered In Pricing Data In This Group.
D. Group Iv - Data Which The Contractor Has Developed As Part
Of His Commercial Business. Not Much Of This Data Is Required
And The Cost Is Insignificant. The Item Should Normally
Be Coded "no Charge." An Example Is A Brochure Or Brief Manual
Developed For Commercial Application Which Will Be Acquired
In Small Quantities, And The Added Cost Is Too Small To Justify
The Expense Of Computing The Charge That Otherwise Would Go
With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total
Price Which Is Estimated To Be Attributable To The Production
Or Development For The Government Of That Item Of Data. The
Entry "n/c" For "no Charge" Is Acceptable.
mark Packaging Label With The Nomenclature Cited On The Irpod.
the Requirements To Comply With Mil-std-45662 Apply To This Item.addition To Mil-std-129 Markings:mil-i-24244 Markings Apply. Also, Markeach Unit, Intermediate & Shipping Container Clearly With: "insulation Freeof Asbestos And Ceramic(refractory) Fibers.
date Of First Submission=045 Dac
submit For Approval One Package (iaw Di-qcic-8871) Of All Applicable Procedure, Drawing And Other Pre-manufacturing Submittals, Listed On The Individual Repair Part Ordering Data (irpod) Document(s) And Detailed In The Cited Specification, Within 45 Days After
contract Award To The Contracting Officer (navsup-wss Code N9433). See Irpod For Individual Documents Required.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8871 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Procedure Package To Be Iaw Did Di-qcic-8871(latest Rev).
date Of First Submission=eoc
submit To Navsup-wss, Code N9433 For Review, A Complete Package Of All Applicable Vendor Certified Reports Of Test And Inspection Per Di-qcic-8872(latest Rev) See (individual Repair Parts Ordering Data) Irpod For Individual Documentsrequired.
the Package Will Be Submitted Per The Contract Delivery Schedule, And Authorization To Ship Material Must Be Obtained From The Pco.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8872s Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Roti Package To Be Iaw Did Di-qcic-8872(latest Rev).
Closing Soon23 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|x||||||||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo) Type||cognizant Dfas|n00383|cognizant Dcma|cognizant Dcma|see Schedule|source|||||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
limitation Of Liability--high-value Items (feb 1997)|1||
limitations On Pass-through Charges (jun 2020)|1||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|12|336413|1250|||||||||||
facsimile Proposals (oct 1997)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x|
this Solicitation Will Be Using Competitive Procedures.
this Solicitation Is For Made New Manufacture Spare Parts.
this Requirement Will Be Awarded To The Offeror Based On The Following Evaluation Criteria Submitted Via Quote.
offers Submitted Will Be Evaluated Based On The Following Criteria: Lead Time, Price, Past Performance And Capacity.
the Closing Date For This Solicitation Is Listed On Page 1.
the Quotes May Be E-mailed To The Below Address And Must Be Received On Or Before 2:00 Pm Est Of The Closing Date.
the Offeror Shall Submit One Unit Price Per Clin And The Unit Price Should Be Firm Fixed Price. Tiered Pricing Will Not Be Accepted Or Evaluated.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be ?issued? By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods, Such As E-mail. The Government?s Acceptance Of The Contractor?s Proposal Constitutes Bilateral Agreement To Issue Contractual Documents As Detailed Herein.
\
1. Scope
1.1 . Markings Shall Be In Accordance With Mil-std-130.
1.2 Pre-award / Post Award Requirements:
due To The Critical Use Of This Item And Its Quality History, A Pre-award Survey And Post-award Conference May Be Required For All New Manufacturers. For All Previous Sources, A Post-award Conference May Be Recommended.
1.3 The Components Being Acquired Under This Solicitation Have Been Classified As Flight Critical Requiring Engineering Source Approval By The Naval Air Systems Command. Only Those Companies Who Have Submitted Requests For Source Approval And Been Approved
will Be Eligible For Award Under This Solicitation. Any Company Not Previously Approved May Submit A Source Approval Request To The Contracting Officer, Naval Inventory Control Point, (see Block 10 Of The
sf33 For Name And Code). The Source Approval Request Shall Contain The Following Documentation And Shall Be Submitted By The Closing Date Of This Solicitation:
(a) Copy Of Complete Configuration Drawings For A Similar Item(s) Which Your Company Has Produced Within The Past Three Years, Including Test Procedures For Which Your Company (1) Has Been Qualified To Manufacture And (2) Which Is Similar, I.e., Requires The
same Materials, Manufacturing Processes, Inspections, Tolerances And Similar Application As The Item(s) For Which You Are Seeking Approval.
(b) Copy Of The Complete Process/operation Sheets Used To Manufacuture The Similar Item, Including But Not Limited To, Detailed Shop Sketches. These Plans Must Note Those Operations And Processes Performed By Subcontractors/ Vendors.
(c) Complete Copies Of Purchase Orders, Shipping Documents, Etc. That Document Delivery Of Production Quantities Of The Part To The Original Equipment Manufacturer Or Military Service. Provide The Most Recent Copies Of The Documents.
(d) A Detailed Comparative Analysis Of The Differences/similarities Between The Similar Part And The Part(s) For Which You Are Seeking Approval. This Analysis Should Include Materials, Configuration, Tolerances, Process Requirements, Dimensions, Castings,
forgings, Etc.
(e) Copy Of Inspection Method Sheets Used In The Manufacturing And At Final Inspection. These Sheets Should Include Actual Tolerance, Print Requirements, Inspection Devices, Sources Performing The Operation And Level Of Inspection. Critical Characteristics
should Be Discernible From All Other Characteristics.
the Above Requirements Are A Subset Of Requirements Specified In The Aso
source Approval Information Brochure Dated January 1995. The Submission Of This Data Subset Is Contingent Upon And In Consideration Of The Submitting Contractor Meeting All Other Requirements Specified In This Solicitation To Include A Bilateral Agreement With
mda Which Includes Availability Of Complete Data, Mrb Disposition, Etc. Any Company Not Having Such Agreement, But Desiring To Seek Engineering Source Approval, Will Be Required To Submit Data Meeting All Requirements Of The Aso/navicp Source Approval
brochure.
1.4 Sampling Rates (aqls) Indicated Below Shall Be Used In Accordance With
ansi Z1.4 For Single Sampling And A General Inspection Level Of Ii.
1.5 In Addition To The 100% Pco Mandatory, Critical And Major Characteristics,
attributes For Plating, Hardness And Non-destructive Testing Will Be Inspected
one Hundred Percent.
1.6 Contractor Shall Develop A System For Identification Of Individual
piece Parts For Traceability Purposes. Markings Shall Not Be Permanent.
1.7 An Aql Of 1.5 Will Be Used For Class 3 Threads And Dimensions, And
geometric Feature Controls With A Tolerance Range Of .010 Or Less.
1.8 For Minor Characteristics, A Sampling Rate Determined By The Contractor
and Subject To Qar Approval Will Be Used.
1.9 The Material Covered In This Contract/purchase Order Will Be Used In A
crucial Shipboard System Enabling The Launch And/or Recovery Of Aircraft. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In A Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems Or Loss Of Aircraft. Therefore,the Material Has Been
designated As Critical Material And Special Control Procedures Are Invoked
to Ensure Receipt Of Correct Material.
1.10 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;nawc Lakehurst; Drawing Number ( ;80020; ) ;616712-2; , Revision ;t; And All Details And Specifications Referenced Therein.
1.11 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not
be Provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced
specification.
1.12 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c.
2. Applicable Documents
drawing Data=a409078 |80020| L| |a| | | |
drawing Data=c414463 |80020| M| |c| | | |
drawing Data=mpr 1221 |80020| T| |d| | | |
drawing Data=mpr 1293 |80020| | |d| | | |
drawing Data=naec-eng-6518 |80020|bp| |d| | | |
drawing Data=418607 |80020| D| |d| | | |
drawing Data=418689 |80020| E| |d| | | |
drawing Data=419159 |80020| E| |d| | | |
drawing Data=419963 |80020| E| |d| | | |
drawing Data=419964 |80020| E| |d| | | |
drawing Data=420049 |80020| H| |d| | | |
drawing Data=513065 |80020| C| |d| | | |
drawing Data=514511 |80020| F| |d| | | |
drawing Data=514512 |80020| E| |d| | | |
drawing Data=514513 |80020| D| |d| | | |
drawing Data=514515 |80020| J| |d| | | |
drawing Data=514858 |80020| B| |d| | | |
drawing Data=615940 |80020| N| |d| | | |
drawing Data=616711 |80020| K| |d| | | |
drawing Data=616958 |80020| M| |d| | | |
drawing Data=619947 |80020| N| |d| | | |
3. Requirements - Not Applicable
4. Quality Assurance
quality Assurance Requirements:
1. The Contractor Shall Perform Quality Conformance And Lot Sampling Inspection For All Associated Features That Are Present In The Drawings And Specifications:
A. Features/attributes/requirements Classified As Critical And Major On The Drawing(s) Or Within The Technical Specification Shall Be Inspected And Shall Have The Actual Dimensions Documented 100%;
B. Attributes For Plating, Hardness, And Non-destructive Testing Shall Be Inspected 100%;
C. Class 3 Threads, Dimensions, And Geometric Feature Controls With A Tolerance Range Of .010 Or Less Shall Be Inspected Using An Aql Of 1.5 And The General Inspection Level Ii As Defined By Ansi Z1.4.
D. Minor Characteristics: Sampling Shall Be Inspected Using An Aql Of 4.0 And The General Inspection Level Ii As Defined By Ansi Z1.4.
2. First Article Testing: N/a
3. Production Lot Special Tests:
A. Each Valve, P/n 616712-2, Shall Be Shipped To Lakehurst For Acceptance Inspection And Testing As Cited On Drawing616712.
4. For Purposes Of This Tdr, The Term Ndt Shall Refer To The Following Methods: Mt - Magnetic Particle Testing, Pt - Penetrant Inspection, Ut - Ultrasonic Testing, Rt - Radiographic Testing, And Vt - Visual Testing.
5. Companies Performing Ndt Shall Be Nadcap Accredited, Or A Laboratory Accredited By One Of The Organizations Listed Below As Satisfying Iso 17025 (general Requirements For The Competence Of Testing And Calibration Laboratories). Ndt Certificates Shall Be Bear
the Symbols Of Accreditation And The Accreditation Body:
A. American Association For Laboratory Accreditation (a2la)
B. Ansi National Accreditation Board (anab)
C. International Accreditation Service, Inc (ias)
D. National Voluntary Laboratory Accreditation Program (nvlap)
E. Perry Johnson Laboratory Accreditation, Inc (pjla)
F. Canadian Association For Laboratory Accreditation Inc. (cala)
G. Standards Council Of Canada (scc)
4.1 Review Documentation As Provided Under Dd 1423 Requirements.
4.2 Critical Manufacturing Processes
( ;applies; ) Heat Treat
( ; ; ) Welding
( ;applies; ) Cadmium Plating
( ; ; ) Engineering Chrome Plating
( ; ; ) Nickel Chrome Plating
( ; ; ) Casting(s)
( ; ; ) Forging(s)
( ;applies; ) Mpr (material Processing Requirements)
4.3 Production Lot Sample Test Requirements: The Tests To Be Performed Under The Production Lot Sample Testing Provisions Of The Contract Are As Follows:
4.3.1 Workmanship
production Lot Samples Shall Be Inspected To Determine The General Workmanship.
4.3.2 Dimension Check
production Lot Samples Shall Be Inspected To Determine Compliance With Applicable Drawings And/or Specifications.
;applies;
4.3.3 Form:
;applies;
4.3.4 Fit:
;n/a;
4.3.5 Function:
;n/a;
4.3.6 Requirements Of:
;nawc Drawing Package;
4.4 In Addition To The Above Tests, The Production Lot Samples To Be Delivered Hereunder Shall Also Be Subjected To Those Tests Which Will Demonstrate That The Samples Comply With The Contract Requirements.
4.5 The Contractor Will Be Responsible For Providing The Necessary Parts And Repair Of The Production Lot Sample During Testing.
4.6 The Cost Of The Government Testing Effort Set Forth In This Solicitation Is Estimated To Be $ ;tbd; For Each Lot Of Production Lot Testing. This Cost Factor Will Be Added, For Solicitation Purposes, To The Price Of All Offerors For Whom The Government
will Require Such Testing.
4.7 Disposition Of Test Samples
4.7.1 ; ; Samples Will Not Be Returned To The Contractor As They Will Be Destroyed During Testing.
4.7.2 ;applies; Unless Otherwise Provided For In The Contract, Samples Shall Be Returned To The Contractor And May Be Considered As Production Items Under The Contract Provided The Samples Can Be Refurbished To Ready For Issue Condition And Provided The
samples Have Inspection Approval Of The Cognizant Dcmc Qar. Samples May Be Shipped As Production Items Only After All Other Units Required Under The Contract Have Been Produced And Are Ready For Shipment.
4.7.3 ; ; Samples Shall Be Returned To The Contractor But Shall Not Be Considered As Production Due.
4.8 Production Lot Samples Testing Criteria
4.8.1 (a) The Production Lot Samples Shall Be ;100%, All Units; ; Selected At Random By The Cognizant Government Inspector. All Transportation Charges Will Be Prepaid By The Contractor And Will Be Shipped To:
;contact For Shipping Address:
jose Torraca Nawcadlke Qa Rep / Tel: (732)-323-2834
e-mail: Jose.g.torraca.civ@us.navy.mil Or
drew Flast / Drew.s.flast.civ@us.navy.mil; ;
the Samples Shall Be Identified By Contract Number And Lot Number And Shall Be Clearly Marked As Follows:
production Lot Samples
not Rfi Material
do Not Take Up In Stock
(b) Fourteen (14) Days Prior To The Shipment Of The Production Lot Samples, The Contractor Shall Notify The Designated Test Facility, In Writing, Of The Anticipated Shipping Date, With An Information Copy To The Pco, Naval Inventory Control Point, Attn: (see
block 10.a Of The Sf33 For Name And Code), With Duplicate Copies To Navicp Code ;pco; ; And To The Designated Testing Facility. The Envelope Shall Be Clearly Marked "do Not Open In Mailroom".
(c) Such Samples Shall Be Delivered To The Testing Facility In Sufficient Time Prior To The Delivery Date Of The Production Articles To Allow A 165 Day Period For Testing By The Laboratory And Written Notification By The Contracting Officer Of The Approval,
conditional Approval, Or Disapproval Of The Samples. In The Event The Contractor Does Not Receive Written Notification Or Approval, Conditional Approval Or Disapproval Or The Samples For A Particular Production Lot Within The Above Stated Time Frame, The
contract Delivery Schedule Shall Be Equitably Adjusted As Necessary. Within 120 Days Of The Receipt Of The Samples, The Testing Facility Shall Notify The Contracting Officer, Naval Inventory Control Point, Attn: (see Block 10 Of The Sf33 For Name And Code) Of
the Results Of The Testing, Together With A Recommendation For Approval Or Disapproval.
(d) If The Contractor Fails To Deliver Any Production Lot Samples For Testing Within The Time Or Times Specified, Or If The Contracting Officer Disapproves Any Production Lot Samples, The Contractor Shall Be Deemed To Have Failed To Make Delivery Within The
meaning Of The Default Clause Of This Contract, And This Contract Shall Be Subject To Termination For Default.
(e) In Order For A Production Lot To Be Acceptable, All Samples Representative Of The Lot Must Pass All Of The Contract Requirements. In The Event A Sample Fails To Pass Such Requirements, The Lot Will Be Rejected. In Such Event, The Government May, At Its
option And At No Additional Cost To The Government, (i) Terminate All Or Any Portion Of This Contract For Default, (ii) Require The Manufacture Of A New Production Lot, Or A Rework Of The Rejected Production Lot If The Means And Procedures Proposed By The
contractor For Rework Are Acceptable To The Government, Or (iii) Require The Submission Of Additional Samples For Test. The Foregoing Procedures Shall Apply To New Or Reworked Production Lots In The Same Way As They Did To The Original Production Lot.
(f) For Each Additional Sample Or Each Resubmission Of A Modified Sample Which The Contractor Is Required To Submit For Approval Hereunder As A Result Of The Failure Of A Previous Sample To Conform To The Requirements Of The Specifications, The Contractor
shall Pay To The Government The Costs Of Reinspection, Shipping, Examination And Retesting By The Government, And The Contractor And His Sureties (if Any) Shall Be Liable For The Amount Of Such Costs.
(g) All Transportation Charges Incurred In The Submission And Return Of Any Production Lot Shall Be Borne By The Contractor.
(h) Nothing Contained In The Foregoing Provisions Of This Clause, And No Action Of The Government In Accordance Herewith, Shall In Any Way Prejudice The Right Of The Government Under The Clause Of This Contract Entitled Default.
4.9 Alternate Offers - Waiver Of Production Lot Testing Approval Requirements
(a) Unless Otherwise Specified In Section E Of This Solicitation, The Naval Inventory Control Point Reserves The Right To Waive The Production Lot Testing Approval Requirements Specified Herein For Offerors Who Have Previously Furnished Identical Production
articles Accepted By The Government Or The Original Equipment Manufacturer/prime Manufacturer. An Offeror Requesting Waiver Of Production Lot Testing Approval Requirements Shall Submit Evidence With Its Offer Establishing That:
(i) The Last Production Unit Was Delivered Within Three (3) Years Of The Issue Date Of This Solicitation And
(ii) The Production Location To Be Used For This Requirement Is The Same As Used For The Previous Production Run.
additionally, The Offeror Shall Submit A Certification To Be Executed By The Officer Or Employee Responsible For The Offer, Stating That:
(i) The Articles To Be Provided Will Be Produced Using The Same Facilities, Processes, Sequence Of Operations And Approved Subcontractors As Those Previously Delivered And Accepted By The Government Or Original Equipment Manufacturer/prime Manufacturer,
and
(ii) The Previous Production Units Were Manufactured Without Material Review Board Disposition Or Waiver/deviation Request Or Rejection Of Pre-production Samples For Cause.
(note: This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States And The Making Of A False, Fictitious, Or Fraudulent Certification May Render The Maker Subject To Prosecution Under Title 18, United States Code, Section
1001.)
(b) In The Event Waiver Of The Production Lot Testing Approval Requirements Is Granted, The Delivery Schedule For The Production Units Shall Be One Hundred And Sixty-five (165) Days Earlier Than That Which Is Desired Had The Waiver Not Been Granted. If The
offeror Is Unable To Meet The Desired Schedule, He Shall Insert Below The Alternate Delivery Schedule He Offers The Government.
Offeror's Alternative Proposed Delivery Schedule
(based On Waiver Of Production Lot Testing Approval Requirements)
within Days:
item No. ______________ Quantity:_______ After Date Of Contract:______________
4.10 . Mandatory Inspection Requirements:
100% Procurement Contracting Officer (pco) Mandatory Inspection Is Required And Shall Be Accomplished At Source Under The Surveillance And Final Approval Of The Cognizant Dcmao Quality Assurance Representative (qar).
during Production, Mandatory Inspection Is Required To Be Accomplished By The Contractor As Follows:
A. Level Of Inspection (loi).
1. Critical Characteristics: 100% Inspection Shall Apply.
2. Major And Minor Characteristics: Loi Shall Be In Accordance With A Sampling Plan Acceptable To The Qar.
B. Critical Characteristics:
;jose Torraca Nawcadlke Qa Rep / Tel: (732)-323-2834
e-mail: Jose.g.torraca.civ@us.navy.mil;
C. Major And Minor Characteristics
1. Shall Be Defined By The Contractor Subject To Qar Concurrence, Unless Defined On Applicable Drawings And Associated Specifications.
4.11 Special Inspection Requirements
( ;applies; ) Magnetic Particle Inspection
( ;applies; ) Surface Inspection
( ; ; ) Penetrant Inspection
( ; ; ) Radiographic Inspection
( ; ; ) Ultrsonic Inspection
( ;applies; ) High Shock Test
( ;applies; ) Mechanical Vibration Test
4.12 Final Inspection Requirement:due To The Critical Nature Of This Item, Representatives Of The Buying
office/and The Cognizant Field Activity, Nawc Lakehurst, Shall Be Notified By The Successful Contractor At Least 14 Days Prior To Presentation To The Dcm Qar Of The Items For Final Inspection So That They May Have The Option Of
witnessing The Final Inspection. The Contractor Shall Notify By Email Or
telefax Pco And Nawc Lakehurst Qa ;jose Torraca Nawcadlke Qa Rep / Tel: (732)-323-2834
e-mail: Jose.g.torraca.civ@us.navy.mil; To Arrange For The Final Inspection.the Authority Of The Qar Shall Not Be Abrogated. If The Notification Is Not Given To Both Sites Then The Qar Shall Not Accept The Units.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
this Is A Alre Critical Application Item. For Drawing Updates, See Attached Nawc Lke Drawing Update Sheet.
navsup Reference Only: Procurement Tdr (24-10123):
the Components Being Acquired Under This Solicitation Have Been Classified As "critical" Requiring Engineering Source Approval By Naval Air Systems Command Only Those Companies Who Have Submitted And Been Approved Will Be Eligible For Award Under This
solicitation Any Company May Submit A Source Approval Request As Outlined In This Solicitation.
all Records Pertaining To Alre Csi/cai Manufacture And Inspection/test Shall Be Provided To The Alre Cognizant Technical Authority. All Records Shall Be Maintained By Lke Qa And By The Manufacturer For A Period Of Seven Years.
date Of First Submission=asreq
16. Remarks:
(block 12) Date Of First Submission: Concurrently With Delivery Of Plt Items.
Inspection/certification Data Needed To Substantiate The Quality Ofthe Production Lot Test Units Shall Be Included In Production Lot Test Unit Pa Ckaging. The Outside Of The Package That Contains The Data Shall Be Clearly Ma Rked "inspection/certification Data
included".
data Requirements:
a. Copies Of All Approved Requests For Variations.
b. Dimensional Inspection Per Drawings 616712, 616958, 616711, 514513, 514512, 514511, 419964, 514858, 619947, 615940, 419159, 420049, 418607, 419963, 418689, C414463, And A409078.
c. Dimensional Inspection In Accordance With Naec-eng-6518 Per Drawing 616712.
d. Finish In Accordance With Mpr 1221-31 Per Drawing 616712.
e. Part Identification Per Drawings 616712, 616711, 514858, 514515, 619947, 615940, 418689, And A409078.
f. Hydrostatic Test Per Drawings 616712, 616958.
g. Shock Test Per Drawing A409078.
h. Material Properties Per Drawings 616712, 616958, 514512, 514511, 616711, 514513, 419964, 419963, 514858, 514515, 615940, 420049, 418689, 419159, 418607, C414463, And A409078.
i. Preserve And Package In Accordance With Mpr 1293 Per Drawing 616958.
j. Magnetic Particle Inspection Per Drawings 616711, 514513, 514512,514511, 419963, 418689, And C414463 (prior To Coating).
k. Nitride Per Drawing 616711.
l. Heat Treat Per Drawings 514513, 514511, 419963, 419159, And 418689.
m. Carburize Per Drawings 514512 And 615940.
n. Proof Of Shock And Vibration Tests Per Drawing A409078.
o. Zinc Plate Per Drawing C414463.
p. Cadmium Plate Per Drawing A409078.
q. Assembly Per Drawing 616712.
r. 100% Inspect, And Record The Readings For The Pitch And Functional Diameters; And Document That The Inspection Results Are Acceptable And Are Iaw System 22 Of Fed-std-h28/20 Per Drawings A409078, 616958, 616711, 514511, 514512, 514513, 419963, 419964,
c414463.
date Of First Submission=asreq
16. Remarks:
(block 12) Date Of First Submission: Concurrently With Final Inspection.
data Requirements:
a. Copies Of All Approved Requests For Variations.
b. Dimensional Inspection Per Drawings 616712, 616958, 616711, 514513, 514512, 514511, 419964, 514858, 619947, 615940, 419159, 420049, 418607, 419963, 418689, C414463, And A409078.
c. Dimensional Inspection In Accordance With Naec-eng-6518 Per Drawing 616712.
d. Finish In Accordance With Mpr 1221-31 Per Drawing 616712.
e. Part Identification Per Drawings 616712, 616711, 514858, 514515, 619947, 615940, 418689, And A409078.
f. Hydrostatic Test Per Drawings 616712, 616958.
g. Shock Test Per Drawing A409078.
h. Material Properties Per Drawings 616712, 616958, 514512, 514511, 616711, 514513, 419964, 419963, 514858, 514515, 615940, 420049, 418689, 419159, 418607, C414463, And A409078.
i. Preserve And Package In Accordance With Mpr 1293 Per Drawing 616958.
j. Magnetic Particle Inspection Per Drawings 616711, 514513, 514512,514511, 419963, 418689, And C414463 (prior To Coating).
k. Nitride Per Drawing 616711.
l. Heat Treat Per Drawings 514513, 514511, 419963, 419159, And 418689.
m. Carburize Per Drawings 514512 And 615940.
n. Proof Of Shock And Vibration Tests Per Drawing A409078.
o. Zinc Plate Per Drawing C414463.
p. Cadmium Plate Per Drawing A409078.
q. Assembly Per Drawing 616712.
r. 100% Inspect, And Record The Readings For The Pitch And Functional
Diameters; And Document That The Inspection Results Are Acceptable And Are Iaw System 22 Of Fed-std-h28/20 Per Drawings A409078, 616958, 616711, 514511, 514512, 514513, 419963, 419964, C414463.
Closing Date31 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|tbd|tbd|tbd|tbd|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12|||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13|334513, 750|||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|334513|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
a Material Irpod Is Available At The Bpmi Site. Vendor Review Of The Irpod Is Mandatory.
unless Otherwise Specified, Pricing For This Quotation Is Valid For 60 Days After The Closing Date As Indicated On The Quotation. Please Specify (if Other Than 60 Days) ______________ Days. If You Are Submitting Your Quote Via Email Or Neco, Please Specify The
number Of Days Pricing Is Valid.
All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein.
the Following Applies If Reports Of Test And Inspection (roti) Are Required:
the Recommended Method For Roti Submittals Is Via Wawf Or An Alternative High Quality Electronic Means (ie: Fax Or Email Your Post Award Poc Listed Above). A Dedicated Roti Fax Has Been Added For Your Submittal Convenience.
\
1. Scope
1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence.
2. Applicable Documents
2.1 Applicable Documents;
technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At
(https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To
the Award.
this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator.
3. Requirements
3.1 Navsup Wss-mech Code N94 Additional Technical Documentation
order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004
a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of
any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows:
1. Amendments To The Purchase Order/contract
2. Schedule Of Supplies Of The Purchase Order/contract.
3. Terms And Conditions Of The Purchase Order/contract.
4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable.
5. Any Invoked Standard Technical Requirements (strs).
6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable.
7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable.
b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents:
1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval
for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided.
2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later.
c. Use Of Document Revisions In Their Entirety:
1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document).
d. Vendor Waiver/deviations On Critical Contracts.
1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected.
2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation
is Submitted Or Prior To Manufacture.
3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With
your Request.
4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or
replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation.
5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided.
6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within
five Working Days After Receipt.
e. Exclusion Of Mercury
1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract.
4. Quality Assurance
4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod).
the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein.
records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract.
5. Packaging
5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts
applies.
(1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing,
and Marking.
requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc.
(a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States,
"components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)".
(2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply:
(a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other
requirements Identified Within The Irpod.
the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods.
(b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements
for The Use Of Green Poly Bags, Then They Are Required And Take Precedence.
(4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s)
Which Are Part Of The Total Requirement Of The Contract/purchase
Order.
block C: Is The Category Of Data Required, Tdp Is Defined
In Mil-t-31000. Tm Is Defined In Part 1x, Section B
Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's
Included In Our Solicitations Meet The Requirement Of Tdp As
Navsup-wss Does Not Regularly Purchase Only Technical Manuals
Without Purchasing Hardware And Related Tdp Software. Therefore,
Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item
Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number,
Invitation For Bid Number Or Another Number For Tracking And
Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The
Individual Who Prepared The Dd Form 1423 And Included The
Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content
And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If
The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual
Technical Manual Contract Requirements Number. In The Event
The Dd Form 1423 Is Requiring A Technical Manual The Numbered
Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement
Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval,
Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And
Acceptance Of The Deliverable Item. The Definition Of The
Codes Is As Follows:
Dd Form 250 Code Inspection Acceptance
Ss (1) (2)
Dd (3) (4)
Sd (1) (4)
Ds (3) (5)
Lt (6) (7)
No (8) (8)
Xx (9) (9)
(1) Inspection At Source.
(2) Acceptance At Source.
(3) No Inspection Performed At Source. Final Inspection
Performance At Destination.
(4) Acceptance At Destination.
(5) Acceptance At Source. Acceptance Based On Written
Approval From The Contract Officer.
(6) Letter Of Transmittal Only. Lt Should Not Be Used When
Inspection Is Required. The Data Is Sent By The
Contractor Directly To The Personnel Listed In Block 14
Of The Dd Form 1423. Lt Is Used When The Contracting
Agency Does Not Desire To Have A Dd Form 250 For Each
And Every Piece Of Data Developed By The Contractor.
The Only Other Authorized Use Of Lt Is The Special
Case Where The Contracting Agency Does Not Desire To
Have Separate Dd Forms 250 But Desires To Have A
Government Quality Assurance Representative Perform
Inspection. The Government Quality Assurance
Representative Shall Be Listed On The Distribution
In Block 14 And Requested To Provide Comments Via
The Quality Assurance Letter Of Inspection.
Use Of The Symbol Lt Is Not Authorized For Data Comprising
Final Delivery Of Technical Data Package Of For Technical
Manuals. (lt May, However, Be Used For Delivery Of
Preliminary Tdp's Or Tm's).
(7) As Specified In Block 8 Of The Dd Form 1423.
(8) No Inspection Or Acceptance Required. No Dd Form 250 Or
Letter Of Transmittal Required.
Use Of The Symbol No Is Not Authorized For Data Comprising
Technical Data Packages Or For Technical Manuals.
(9) Inspection And Acceptance Requirements Specified Elsewhere
In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring
Specific Advanced Written Approval Prior To Distribution Of
The Final Data Item Will Be Identified By Placing An "a"
In This Field. This Data Item Requires Submission Of A
Preliminary Draft Prior To Publication Of A Final Document.
When A Preliminary Draft Is Required, Block 16 Of The Dd
Form 1423 Will Show Length Of Time Required For Government
Approval/disapproval And Subsequent Turn-around Time For The
Contractor To Resubmit The Data After Government
Approval/disapproval Has Been Issued. Block 16 Will Also
Indicate The Extent Of The Approval Requirements, E.g.,
Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The
Government Can Circulate The Deliverable Item. The Definition
Of Codes A, B, C, D, E, Or F Is As Follows:
A. Distribution Of The Item Is Unrestricted.
B. Distribution Of The Item Is Limited To Agencies Only.
C. Distribution Of The Item Is Limited To Contractors With
A Cage Code And Have A Dd Form 2345 On File With The
Dla Logistics Information Services (dlis) Battle Creek,
Mich. Or Government Activities.
D. Distribution Of The Item Is Limited To Dod Activities
And Dod Contractors Only.
E. Distribution Of The Item Is Limited To Dod Components
Only.
F. Distribution Of The Item Is Restricted From Foreign
Nations And Foreign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To
Be Delivered To The Government. The Abbreviations And
Their Meaning.
Annly Annually
Asgen As Generated
Asreq As Required
Bi-mo Every Two Months
Bi-we Every Two Weeks
Daily Daily
Dfdel Deferred Delivery
Mthly Monthly
One/r One Time With Revisions
Qrtly Quarterly
Semia Every Six Months
Wekly Weekly
Xtime Number Of Times To Be Submitted
(1time, 2times...9times)
Use Of These Codes Requires Further Explanation In Block 16
To Provide The Contractor With Guidance Necessary To Accurately
Price The Deliverable Data Item.
Other Abbreviations Not Appearing On The Above List May On
Occasion Be Used In Block 10 Of The Dd Form 1423. When Other
Abbreviations Are Used They Will Be Fully Explained In Block 16
Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day
Format, The Deliverable Item Is To Be Received By The
Requiring Office Cited In Block 6 Of The Dd Form 1423
For An Item With A Block 10 Entry Indication A Single
Delivery. If The Item Is To Be Submitted Multiple
Times, The Number Stated Is The Number Of Calendar Days
After The Frequency Cited In Block 10 The Item Is To Be
Received By The Requiring Office Cited In Block 6 Of The
Dd Form 1423. On Occasion The Deliverable Item Will Be
Required To Be Submitted Prior To The End Of The Frequency
Cited In Block 6. In That Event The Requirement Will Be
Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To
The Requiring Office (block 4) Expressed In
Year/month/day Format. The Abbreviations And Their
Meaning Are As Follows:
Asgen As Generated
Asreq As Required
Dac Days After Contract Date
Dfdel Deferred Delivery
Eoc End Of Contract
Eom End Of Month
Eoq End Of Quarter
Specific Instructions For These Requirements Will Be Provided In
Block 16. If The Deliverable Item Is Constrained By A Specific
Event Or Milestone The Constraint Will Be Fully Explained In Block 16
Of The Dd Form 1423. "as Generated", "as Required", And "deferred
Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After
The Initial Submission. Subsequent Submission Is Only Used To
Indicate The Specific Time Period. The Data Is Required When
Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is
Required. This Does Not Apply To Resubmission Of A Deliverable
Item That Has Been Reviewed By The Requiring Office And Determined
To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To
Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full
Name, Address (including Code) Will Be Specified. That Specific
Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To
Be Submitted. When Final "repro" Copies Are To Be Submitted
Block 16 Will Clarify The Type Of Repro Copies Required.
(e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required
By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information
Blocks 1 Through 15. This Block Is Also The Only Area Used To
Tailor The Document Listed In Block 4. Only Deletions To The
Minimum Requirements Stated In The Document In Block 4 Are
Allowed. Block 16 May Also Be Used To Specify The Medium For
Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offeror Is To Enter The
Appropriate Price Group. The Price Groups Are Defined As Follows:
A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This
Type Of Data To Perform The Rest Of The Contract. Price
Would Be Based On Identifiable Direct Costs, Overhead, General
And Administrative (g&a) And Profit.
B. Group Ii - Data Essential To Contract Performance Which Must Be
Reworked Or Amended To Conform To Government Requirements.
The Price For Data In This Group Would Be Based On The Direct
Cost To Convert The Original Data To Meet Government Needs And
To Deliver It, Plus Allocable Overhead, G&a And Profit.
C. Group Iii - Data Which The Contractor Must Develop For His Own
Use And Which Requires No Substantial Change To Conform To
Government Requirements Regarding Depth Of Content, Format,
Frequency Of Submittal, Preparation, And Quality Of Data. Only
The Costs Of Reproducing, Handling And Delivery, Plus Overhead,
G&a And Profit, Are Considered In Pricing Data In This Group.
D. Group Iv - Data Which The Contractor Has Developed As Part
Of His Commercial Business. Not Much Of This Data Is Required
And The Cost Is Insignificant. The Item Should Normally
Be Coded "no Charge." An Example Is A Brochure Or Brief Manual
Developed For Commercial Application Which Will Be Acquired
In Small Quantities, And The Added Cost Is Too Small To Justify
The Expense Of Computing The Charge That Otherwise Would Go
With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total
Price Which Is Estimated To Be Attributable To The Production
Or Development For The Government Of That Item Of Data. The
Entry "n/c" For "no Charge" Is Acceptable.
6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
6.3 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From:
contracting Officer
navsup Wss-mech
code N943
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On
post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document.
2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents.
mark The Packaging Label With Nomenclature Cited On Irpod. Use Vendor's Carrying Case. Apply A Delicate Instrument Marking To All Levels Of Packaging, Including The Gage Carrying Case. The Carring Case Must Be An Impact Resistant, Waterproof Carry Case. The Case
shall Be Equipped With Cut Or Molded Foam Cushioning To Provide The Best Gage Protection Possible From Shock And Vibration (equivalent To To Pelican Products, Inc. 1500 Case Or Bettera), A Copy Of The Certified Test Results And The Gage Warranty Conditions Shall
be Provided In Case.
date Of First Submission=eoc
submit To Navsup-wss, Code N9433 For Review, A Complete Package Of All Applicable Vendor Certified Reports Of Test And Inspection Per Di-qcic-8872(latest Rev) See (individual Repair Parts Ordering Data) Irpod For Individual Documentsrequired.
the Package Will Be Submitted Per The Contract Delivery Schedule, And Authorization To Ship Material Must Be Obtained From The Pco.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8872s Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Roti Package To Be Iaw Did Di-qcic-8872(latest Rev).
Closing Soon16 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
United States
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a||||||
transportation Of Supplies By Sea (oct 2024)|2|||
federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12|||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
annual Representations And Certifications (may 2024)|13|332510|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
unless Otherwise Specified, Pricing For This Quotation Is Valid For 60 Days After The Closing Date As Indicated On The Quotation. Please Specify (if Otherthan 60 Days) _________ Days.
if You Are Submitting Your Quote Via Email Or Neco, Please Specify The Number Of Days Pricing Is Valid.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein.
1. Scope
1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence.
2. Applicable Documents
2.1 Not Releasable To Foreign Nationals (noforn) Distribution Statement -
;dwg 803-5959324; Is Subject To Special Export Controls And Each Transmittal To Foreign Governments Or Foreign Nationals May Be Made Only With Prior Approval Of The Naval Sea Systems Command.
2.2 Applicable Documents.
technical Documents Associated To This Solicitation Or Award Such As; Drawings,technical Data, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At (https://logistics.unnpp.gov/ecommerce) These Documents, At
the Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To The Award. This Website Requires A Password And
pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator.
3. Requirements
3.1 Manufacture And Design - The Clamp,loop Furnished Under This Contract/purchase Order Shall Meet The Requirements As Specified In The Ordering Data Listed Herein And Throughout The Contract/purchase Order.
(1). Design, Material And Dimensions To Be In Accordance With:
a. Manufacturer: ;naval Ship Systems Command (53711); .
b. Drawing: ;803-5959324; .
c. Piece Number: ;13; .
Revision: ; ; .
d. Part Number: ;803-5959324item-13; .
e. Catalog Number ;.; .
(2). The Following Requirements Apply:
a. Exclusion Of Mercury Requirements Are Cited In The Additional Technical Documentation Located Within Section "c" Of The Contract/purchase Order.
b. ;.; .
3.2 Navsup Wss-mech Code N94 Additional Technical Documentation
order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004
a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of
any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows:
1. Amendments To The Purchase Order/contract
2. Schedule Of Supplies Of The Purchase Order/contract.
3. Terms And Conditions Of The Purchase Order/contract.
4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable.
5. Any Invoked Standard Technical Requirements (strs).
6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable.
7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable.
b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents:
1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval
for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided.
2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later.
c. Use Of Document Revisions In Their Entirety:
1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document).
d. Vendor Waiver/deviations On Critical Contracts.
1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected.
2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation
is Submitted Or Prior To Manufacture.
3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With
your Request.
4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or
replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation.
5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided.
6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within
five Working Days After Receipt.
e. Exclusion Of Mercury
1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract.
4. Quality Assurance
4.1 Quality Assurance Requirements- The Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein.
records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract.
5. Packaging
5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts
applies.
(1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing,
and Marking.
requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc.
(a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States,
"components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)".
(2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply:
(a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other
requirements Identified Within The Irpod.
the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods.
(b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements
for The Use Of Green Poly Bags, Then They Are Required And Take Precedence.
(4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From:
contracting Officer
navsup Wss-mech
code N943
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On
post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document.
2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents.
6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
6.3 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s)
Which Are Part Of The Total Requirement Of The Contract/purchase
Order.
block C: Is The Category Of Data Required, Tdp Is Defined
In Mil-t-31000. Tm Is Defined In Part 1x, Section B
Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's
Included In Our Solicitations Meet The Requirement Of Tdp As
Navsup-wss Does Not Regularly Purchase Only Technical Manuals
Without Purchasing Hardware And Related Tdp Software. Therefore,
Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item
Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number,
Invitation For Bid Number Or Another Number For Tracking And
Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The
Individual Who Prepared The Dd Form 1423 And Included The
Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content
And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If
The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual
Technical Manual Contract Requirements Number. In The Event
The Dd Form 1423 Is Requiring A Technical Manual The Numbered
Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement
Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval,
Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And
Acceptance Of The Deliverable Item. The Definition Of The
Codes Is As Follows:
Dd Form 250 Code Inspection Acceptance
Ss (1) (2)
Dd (3) (4)
Sd (1) (4)
Ds (3) (5)
Lt (6) (7)
No (8) (8)
Xx (9) (9)
(1) Inspection At Source.
(2) Acceptance At Source.
(3) No Inspection Performed At Source. Final Inspection
Performance At Destination.
(4) Acceptance At Destination.
(5) Acceptance At Source. Acceptance Based On Written
Approval From The Contract Officer.
(6) Letter Of Transmittal Only. Lt Should Not Be Used When
Inspection Is Required. The Data Is Sent By The
Contractor Directly To The Personnel Listed In Block 14
Of The Dd Form 1423. Lt Is Used When The Contracting
Agency Does Not Desire To Have A Dd Form 250 For Each
And Every Piece Of Data Developed By The Contractor.
The Only Other Authorized Use Of Lt Is The Special
Case Where The Contracting Agency Does Not Desire To
Have Separate Dd Forms 250 But Desires To Have A
Government Quality Assurance Representative Perform
Inspection. The Government Quality Assurance
Representative Shall Be Listed On The Distribution
In Block 14 And Requested To Provide Comments Via
The Quality Assurance Letter Of Inspection.
Use Of The Symbol Lt Is Not Authorized For Data Comprising
Final Delivery Of Technical Data Package Of For Technical
Manuals. (lt May, However, Be Used For Delivery Of
Preliminary Tdp's Or Tm's).
(7) As Specified In Block 8 Of The Dd Form 1423.
(8) No Inspection Or Acceptance Required. No Dd Form 250 Or
Letter Of Transmittal Required.
Use Of The Symbol No Is Not Authorized For Data Comprising
Technical Data Packages Or For Technical Manuals.
(9) Inspection And Acceptance Requirements Specified Elsewhere
In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring
Specific Advanced Written Approval Prior To Distribution Of
The Final Data Item Will Be Identified By Placing An "a"
In This Field. This Data Item Requires Submission Of A
Preliminary Draft Prior To Publication Of A Final Document.
When A Preliminary Draft Is Required, Block 16 Of The Dd
Form 1423 Will Show Length Of Time Required For Government
Approval/disapproval And Subsequent Turn-around Time For The
Contractor To Resubmit The Data After Government
Approval/disapproval Has Been Issued. Block 16 Will Also
Indicate The Extent Of The Approval Requirements, E.g.,
Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The
Government Can Circulate The Deliverable Item. The Definition
Of Codes A, B, C, D, E, Or F Is As Follows:
A. Distribution Of The Item Is Unrestricted.
B. Distribution Of The Item Is Limited To Agencies Only.
C. Distribution Of The Item Is Limited To Contractors With
A Cage Code And Have A Dd Form 2345 On File With The
Dla Logistics Information Services (dlis) Battle Creek,
Mich. Or Government Activities.
D. Distribution Of The Item Is Limited To Dod Activities
And Dod Contractors Only.
E. Distribution Of The Item Is Limited To Dod Components
Only.
F. Distribution Of The Item Is Restricted From Foreign
Nations And Foreign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To
Be Delivered To The Government. The Abbreviations And
Their Meaning.
Annly Annually
Asgen As Generated
Asreq As Required
Bi-mo Every Two Months
Bi-we Every Two Weeks
Daily Daily
Dfdel Deferred Delivery
Mthly Monthly
One/r One Time With Revisions
Qrtly Quarterly
Semia Every Six Months
Wekly Weekly
Xtime Number Of Times To Be Submitted
(1time, 2times...9times)
Use Of These Codes Requires Further Explanation In Block 16
To Provide The Contractor With Guidance Necessary To Accurately
Price The Deliverable Data Item.
Other Abbreviations Not Appearing On The Above List May On
Occasion Be Used In Block 10 Of The Dd Form 1423. When Other
Abbreviations Are Used They Will Be Fully Explained In Block 16
Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day
Format, The Deliverable Item Is To Be Received By The
Requiring Office Cited In Block 6 Of The Dd Form 1423
For An Item With A Block 10 Entry Indication A Single
Delivery. If The Item Is To Be Submitted Multiple
Times, The Number Stated Is The Number Of Calendar Days
After The Frequency Cited In Block 10 The Item Is To Be
Received By The Requiring Office Cited In Block 6 Of The
Dd Form 1423. On Occasion The Deliverable Item Will Be
Required To Be Submitted Prior To The End Of The Frequency
Cited In Block 6. In That Event The Requirement Will Be
Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To
The Requiring Office (block 4) Expressed In
Year/month/day Format. The Abbreviations And Their
Meaning Are As Follows:
Asgen As Generated
Asreq As Required
Dac Days After Contract Date
Dfdel Deferred Delivery
Eoc End Of Contract
Eom End Of Month
Eoq End Of Quarter
Specific Instructions For These Requirements Will Be Provided In
Block 16. If The Deliverable Item Is Constrained By A Specific
Event Or Milestone The Constraint Will Be Fully Explained In Block 16
Of The Dd Form 1423. "as Generated", "as Required", And "deferred
Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After
The Initial Submission. Subsequent Submission Is Only Used To
Indicate The Specific Time Period. The Data Is Required When
Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is
Required. This Does Not Apply To Resubmission Of A Deliverable
Item That Has Been Reviewed By The Requiring Office And Determined
To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To
Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full
Name, Address (including Code) Will Be Specified. That Specific
Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To
Be Submitted. When Final "repro" Copies Are To Be Submitted
Block 16 Will Clarify The Type Of Repro Copies Required.
(e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required
By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information
Blocks 1 Through 15. This Block Is Also The Only Area Used To
Tailor The Document Listed In Block 4. Only Deletions To The
Minimum Requirements Stated In The Document In Block 4 Are
Allowed. Block 16 May Also Be Used To Specify The Medium For
Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offeror Is To Enter The
Appropriate Price Group. The Price Groups Are Defined As Follows:
A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This
Type Of Data To Perform The Rest Of The Contract. Price
Would Be Based On Identifiable Direct Costs, Overhead, General
And Administrative (g&a) And Profit.
B. Group Ii - Data Essential To Contract Performance Which Must Be
Reworked Or Amended To Conform To Government Requirements.
The Price For Data In This Group Would Be Based On The Direct
Cost To Convert The Original Data To Meet Government Needs And
To Deliver It, Plus Allocable Overhead, G&a And Profit.
C. Group Iii - Data Which The Contractor Must Develop For His Own
Use And Which Requires No Substantial Change To Conform To
Government Requirements Regarding Depth Of Content, Format,
Frequency Of Submittal, Preparation, And Quality Of Data. Only
The Costs Of Reproducing, Handling And Delivery, Plus Overhead,
G&a And Profit, Are Considered In Pricing Data In This Group.
D. Group Iv - Data Which The Contractor Has Developed As Part
Of His Commercial Business. Not Much Of This Data Is Required
And The Cost Is Insignificant. The Item Should Normally
Be Coded "no Charge." An Example Is A Brochure Or Brief Manual
Developed For Commercial Application Which Will Be Acquired
In Small Quantities, And The Added Cost Is Too Small To Justify
The Expense Of Computing The Charge That Otherwise Would Go
With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total
Price Which Is Estimated To Be Attributable To The Production
Or Development For The Government Of That Item Of Data. The
Entry "n/c" For "no Charge" Is Acceptable.
mark Packaging Label With Nomenclature:
clamp Assy1/4ips
in Lieu Of:
clamp,loop
\
date Of First Submission=eoc
submit At The Time Of Material Delivery A Certificate Of Compliance Per Di-misc-81356 To Navsup-wss Code N9433. A Separate Certificate Of Compliance Shall Be Prepared And Submitted For Each Unique Combination Of Contract/purchase Order Number, National Stock
number And Item Nomenclature Specified In The Schedule Of Supply/services.
di-misc-a81356 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control
number - Certification Package To Be Iaw Did Di-misc-81356(latest Rev).
Closing Soon16 Jan 2025
Tender AmountRefer Documents
4811-4820 of 4888 active Tenders