Ppe Tenders

Ppe Tenders

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others
United States
Details: This Is A Combined Synopsis/solicitation For Commercial Products And Commercial Services Prepared In Accordance With The Format In Federal Acquisition Regulation (far) Subpart 12.6, Streamlined Procedures For Evaluation And Solicitation For Commercial Products And Commercial Services, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested, And A Written Solicitation Document Will Not Be Issued. this Solicitation Is Issued As An Rfq. The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2024-02, Effective 12/22/2023. this Solicitation Is Set-aside For 100% Service-disabled Veteran-owned Small Business (sdvosb). This Is A Firm-fixed Price Contract. the Associated North American Industrial Classification System (naics) Code For This Procurement Is 811210, With A Small Business Size Standard Of $34.0 Million. the Fsc/psc Is J066. the Award Will Be Made To The Quote Most Advantageous To The Government And Best Meets The Requirement Described In The Statement Of Work. price And Other Factors: See Attachment 2, Far 52.212-2 Evaluation statement Of Work contract Title 3500xl Genetic Analyzers And 7500 Fast Polymerase Chain Reaction (pcr) Systems Service Contract the Va Greater Los Angeles Healthcare System (vaglahcs) Requires Annual Maintenance Services On Selected Government Owned 3500xl Genetic Analyzers And 7500 Fast Pcr Systems Equipment At The West La Va Medical Center (wla Vamc). The Services Shall Comply With This Statement Of Work (sow), All Va, Local, State, And Federal Policies, And Regulations. objective the Objective Of This Service Contract Is To Have A Contractor To Furnish All Labor, Materials, Supplies, Tools, Equipment, And Qualified Personnel To Complete Maintenance Services As Per Below Scope. scope the Contractor Shall Provide All Labor, Materials, Freight Costs, And Equipment To Accomplish The Tasks Outlined In This Sow. Contractor Is Responsible For All Subcontractors Required To Complete Reports. all Work Shall Be Performed During Normal Hours Unless Otherwise Approved By The Program Point Of Contact (ppoc) Or His/her Designee. all Work Shall Be In Accordance With Manufacturer S Instructions, Including, But Not Limited To, Adjustments, Calibration, Cleaning, Lubrication, Testing, Disassembly, Checkout, Replacement Of Worn And/ Or Defective Parts, The Above Shall Be Performed As Necessary As Required To Keep Each Equipment In Optimal Working Condition. maintenance And Inspection (pmi) the Contractor Shall Perform Maintenance On The 3500xl Genetic Analyzers And 7500 Fast Pcr Systems According To The Manufacturer Recommendations Unless Otherwise Stated By Ppoc. the Contractor Shall Provide All Preventive Maintenance Replacement Parts At No Cost To The Government. the Contractor Shall Provide All Travel And Transportation Expenses At No Additional Cost To The Government. emergency Repair Services intervening Service Calls Are Calls Placed Outside Regularly Scheduled Preventive Maintenance Service.â  the Contractor Shall Respond On-site As Required Within 2-3 Business Days After Receipt Of A Service Call For Any Instrument Listed.â  response Time Is Applicable For Any Calls Placed Before 2pm Pacific Standard Time.â  failure To Respond Within The Response Time Due To No Fault Of The Government Shall Result In A Prorated Credit Equal To The Proportion Of The Instruments Service Cost For Each Late Day.â  equipment List covered Equipment equipment Name serial Numbers ee# equipment Description 3500xl 24342-140 144937 genetic Analyzer 3500xl 29338-051 177257 genetic Analyzer 7500 Fast 275002720 110018 real Time Pcr System 7500 Fast 275011316 111965 real Time Pcr System 7500 Fast 275013648 134711 real Time Pcr System maintenance Requirements the Contractor Shall Provide On-site Preventive Maintenance And System Calibrations As Necessary To Maintain Recommended Factory Specifications Of The Covered Systems. the Preventive Maintenance Visit Shall Be Scheduled At A Time Agreeable To The Government And Will Be Performed Once Per Year During The Contract Period For Each Equipment Covered. maintenance Shall Be Performed In Accordance With Manufacturer S Instructions. maintenance Shall Be Scheduled A Minimum Of Three (3) Days In Advance With The Ppoc. qualification personnel Performing Maintenance And Repair Services Must Be Fully Qualified, Competent Field Service Engineers (fse) Who Has Been Trained To Perform Work On The Specific Equipment In Accordance With The Original Manufacturer S Maintenance And Repair Procedures. Fully Qualified Is Defined As Factory-trained And Experienced To Work On The Equipment Assigned. additional Requirements contractor Shall Ensure All Equipment Is In Optimal Working Condition At The Expiration Date Of The Contract. contractor Personnel That Perform Changes, Updates, Or Retrofits Made On Any Component, System, Or Equipment Will Log It In The Station Equipment Manual. contractor Will Maintain All Manufactures Manual Necessary To Perform Maintenance. submission Of Reports the Contractor Shall Submit A Complete Field Service Report (fsr) Electronically To The Ppoc Within 7 Calendar Days Of The Work Being Completed. The Fsr At A Minimum Must Contain Company Name, Service Technician S Name, Contact Telephone Number, Date Of Service, A Detailed Description Of Any Services Performed On The Equipment (model Number And Location Included), Serial Number Of The Equipment Being Worked On, Customer Asset Number (ee# - If Applicable) Of The Equipment Being Worked On, Signs Of Misuse Or Neglect, Findings Of Problems And Correction, Including All Performance Verification, Listing Of Replacement Parts, When Applicable; Total Hours Of Service; Safety Check; Performance Data; And Recommendations Necessary To Maintain The Equipment In Optimum Operating Condition. security Requirements the C&a Requirements Do Not Apply, And Security Accreditation Package Is Not Required. this Service Does Not Involve Contractor Connection Of One Or More Contractor-owned It Devices (such As Laptop Computer Or Remote Connection From A Contractor System) To A Va Internal Trusted (i.e., Non-public Network) Therefore Information Technology (it) Security Certification And Accreditation (authorization) (c&a) Requirements Do Not Apply Per Va Handbook 6500.6. period Of Performance base Year, Followed By Two, One-year Options. estimated Start Date: 03/01/2025 Participating Facility: va Greater Los Angeles Healthcare System 11301 Wilshire Blvd. los Angeles, Ca 90073 work Hours normal Hours Of Operation Are Monday Through Friday From 6:00 Am To 6:00 Pm Pacific Time. All Work Is Expected To Be Performed Generally During Normal Hours Of Coverage Unless Requested Or Approved By The Ppoc Or His/her Designee. before Commencement Of Work, The Contractor Shall Confer With The Va Ppoc And Contracting Office To Agree On A Sequence Of Procedures; Means Of Access To Premises And Building. All Work Performed, To Include Delivery Of Materials And Equipment, Shall Be Made With Minimal Interference To Government Operations And Personnel. work Performed Outside The Normal Hours Of Coverage Must Be Approved By The Ppoc Or His/her Designee. all Time Shall Be Approved In Advance By The Ppoc. Allow 5-days For Approval Of Any Alternate Working Hours Needed. federal Holidays new Year S Day january 01 martin Luther King S Birthday third Monday In January president S Day third Monday In February memorial Day last Monday In May juneteenth june 19 independence Day july 04 labor Day first Monday In September columbus Day second Monday In October veterans Day november 11 thanksgiving Day fourth Thursday In November christmas Day december 25 if The Holiday Falls On A Sunday, The Following Monday Will Be Observed As A National Holiday. When A Holiday Falls On A Saturday, The Preceding Friday Is Observed As A National Holiday By U.s. Government Agencies, And Any Day Specifically Declared By The President Of The United States Of America. identification, Check-in, Parking, And Smoking Regulations identification the Vendor's Employees Shall Wear Visible Identification At All Times While On Vaglahcs Premises. Contractor Employees Shall Report To Va Police Upon Entry To The Vaglahcs Facility To Get A Visitor Badge. Contractor Employees Are Required To Be Escorted By The Ppoc Or Designee S Office Once On Campus Prior To Commencement Of Work. During Emergencies Contractor Personnel Shall Check In With Vaglahcs Police If The Vaglahcs Ppoc Or Designee Is Not Available. parking it Is The Responsibility Of The Contract Personnel To Park In The Appropriate Designated Parking Areas. Parking Information Is Available From Va Police & Security Service Office. The Contractor Assumes Full Responsibility For Any Parking Violations. smoking contractor Personnel May Smoke Only In Designated Areas. It Is The Responsibility Of The Visn 22 Healthcare Facilities To Provide A Safe And Healthful Environment For Employees And Patients And To Serve As A Leader In Community Health Awareness And Education. It Is In Fulfillment Of This Obligation That The Facilities Are Committed To The Establishment Of A Smoke-free Environment. This Policy Applies To Every Location In The Healthcare Facilities. There Shall Be No Smoking Within 25 Feet Of All Entrances To Buildings. Smoking Is Allowed In All Outside Areas That Are 25 Feet Away From Entrances To Buildings Unless Indicated Otherwise. Enclosed Patios Connected To Facility Buildings Are Considered Part Of The Building And As Such Are Non-smoking Areas. weapons And Contraband possession Of Weapons Or Contraband Is Prohibited And Shall Be Subject To Arrest And Termination From Future Performance Under This Contract. Enclosed Containers, Including Tool Kits, Shall Be Subject To Search. Violations Of Vaglahcs Regulations May Result In Citation Answerable In The United States (federal) District Court, Not A Local District, State, Or Municipal Court. safety all Personnel Employed By The Contractor In The Performance Of This Contract, Or Any Representative Of The Contractor Entering On Vaglahcs Shall Comply With Applicable Federal, State, And Va Safety And Fire Regulations And Codes, Which Are In Effect During The Performance Period Of The Contract. contractor Shall Perform Work In Strict Accordance With Existing Relevant, Accredited Standards And Codes To Minimize The Possibility Of Injury To Personnel, Or Damage To Government Equipment. Every Effort Shall Be Made To Safeguard Human Life And Property. contractor Shall Comply With All Applicable Federal, State, And Local Requirements Regarding Workers Health And Safety. The Requirements Include, But Are Not Limited To, Those Found In Federal And State Occupational Safety And Health Act (osha) Statutes And Regulations, Such As Applicable Provisions Of Title 29, Code Of Federal Regulations (cfr), Parts 1910 And 1926, Nfpa 70e, Article 130.7 29 Cfr 1910.132(d)(1)(iii), 29cfr1910.137. contractor Shall Provide All Necessary Tools, And Personal Protective Equipment (ppe) To Perform The Work Safely, Effectively, And Timely. contractor Personnel contractor S Program Manager the Contractor Shall Provide A Contract Program Manager Who Shall Be Responsible For The Performance Of The Work. The Name Of This Person Shall Be Designated In Writing To The Contracting Officer. The Contractor S Program Manager Shall Have Full Authority To Act For The Contractor On All Contract Matters Relating To Daily Operation Of This Contract. contractor S Employees the Contractor Shall Not Employ Persons For Work On This Contract If Such Employee Is Identified To The Contractor As A Potential Threat To The Health, Safety, Security, General Well-being Or Operational Mission Of The Installation And Its Population. contract Personnel Shall Be Subject To The Same Quality Assurance Standards Or Exceed Current Recognized National Standards As Established By The Joint Commission (jc). contractor Qualifications & Other Responsibilities contractor Shall Obtain All Necessary Licenses Required To Perform This Work. Contractor Shall Take All Precautions Necessary To Protect Persons And Property From Injury Or Damage During The Performance Of This Contract. Contractor Shall Be Responsible For Any Injury To Himself/herself, His/her Employees, Or Others, As Well As For Any Damage To Personal Or Public Property That Occurs During The Performance Of This Contract That Is Caused By Him/her Or His/her Employees Fault Or Negligence. Contractor Shall Maintain Personal Liability And Property Damage Insurance Prescribed By The Laws Of The Federal Government. the Government Reserves The Right To Accept Or Reject Contractor S Employee For The Rendering Of Services. Complaints Concerning Contract Personnel S Performance Or Conduct Will Be Dealt With By The Contractor And Cor With The Final Decision Being Made By The Contracting Officer. invoicing And Payment overtime & Holiday Pay any Overtime And/or Holiday Pay That May Be Entitled To The Contractor S Employees Shall Be The Sole Responsibility Of The Contractor And Shall Not Be Billed To Nor Reimbursed By The Government. Contractor Will Bill And Be Paid For Actual Services Provided By Contractor Personnel. Contractor Will Not Be Paid For Availability Or On-call Services Unless Otherwise Provided Herein. invoices payment Of Services Rendered Under This Contract Shall Be Made In Arrears Upon Satisfactory Completion Of Each Service And Receipt Of A Properly Prepared Invoice And Submitted By The Contractor To The Payment Address Specified By Contracting. Invoices Shall Reference The Contract Number And Purchase Order Number, Manifest Number(s), Provide A Complete And Accurate Description Of Services/ Supplies Delivered/ Rendered, Including Dates Of Performance, Amounts, Unit Prices, Extended Totals And Any Other Data Relevant For Payment Purposes. the Government Shall Not Authorize Payment Until Such Time That The Vaglahcs Ppoc All Properly Executed And Signed Documentation. no Advance Payments Shall Be Authorized. Payment Shall Be Made On A Monthly Arrears For Services Provided During The Billing Month In Arrears. Upon Submission Of A Properly Prepared Invoice For Prices Stipulated In This Contract For Services Delivered And Accepted In Accordance With The Terms And Conditions Of The Contract, Less Any Deductions Stipulated In This Contract. payment Of Invoices May Be Delayed If The Appropriate Invoices As Specified In The Contract Are Not Completed And Submitted As Required. ***price/cost Schedule*** base Year line Item description quantity unit Of Measure unit Price total Price 0001 preventative/corrective Maintenance, Inspection And Repair- Genetic Analyzer 3500xl Sn: 24342-140 1 yr 0002 preventative/corrective Maintenance, Inspection And Repair- Genetic Analyzer 3500xl Sn: 29338-051 1 yr 0003 preventative/corrective Maintenance, Inspection And Repair- Real Time Pcr System 7500 Fast Sn: 275002720 1 yr 0004 preventative/corrective Maintenance, Inspection And Repair- Real Time Pcr System 7500 Fast Sn: 275011316 1 yr 0005 preventative/corrective Maintenance, Inspection And Repair- Real Time Pcr System 7500 Fast Sn: 275013648 1 yr 0006 emergency Repairs, Costs In Relation To Finding From Inspections. 1 jb 0.00 0.00 option Year 1 line Item description quantity unit Of Measure unit Price total Price 1001 preventative/corrective Maintenance, Inspection And Repair- Genetic Analyzer 3500xl Sn: 24342-140 1 yr 1002 preventative/corrective Maintenance, Inspection And Repair- Genetic Analyzer 3500xl Sn: 29338-051 1 yr 1003 preventative/corrective Maintenance, Inspection And Repair- Real Time Pcr System 7500 Fast Sn: 275002720 1 yr 1004 preventative/corrective Maintenance, Inspection And Repair- Real Time Pcr System 7500 Fast Sn: 275011316 1 yr 1005 preventative/corrective Maintenance, Inspection And Repair- Real Time Pcr System 7500 Fast Sn: 275013648 1 yr 1006 emergency Repairs, Costs In Relation To Finding From Inspections. 1 jb 0.00 0.00 option Year 2 line Item description quantity unit Of Measure unit Price total Price 2001 preventative/corrective Maintenance, Inspection And Repair- Genetic Analyzer 3500xl Sn: 24342-140 1 yr 2002 preventative/corrective Maintenance, Inspection And Repair- Genetic Analyzer 3500xl Sn: 29338-051 1 yr 2003 preventative/corrective Maintenance, Inspection And Repair- Real Time Pcr System 7500 Fast Sn: 275002720 1 yr 2004 preventative/corrective Maintenance, Inspection And Repair- Real Time Pcr System 7500 Fast Sn: 275011316 1 yr 2005 preventative/corrective Maintenance, Inspection And Repair- Real Time Pcr System 7500 Fast Sn: 275013648 1 yr 2006 emergency Repairs, Costs In Relation To Finding From Inspections. 1 jb 0.00 0.00 **please Use The Format Above For Pricing** the Following Solicitation Provisions Apply To This Acquisition: far 52.212-1, Instructions To Offerors Commercial Products And Commercial Services far 52.212-3, Offerors Representations And Certifications Commercial Products And Commercial Services offerors Must Complete Annual Representations And Certifications Electronically Via The System For Award Management (sam) Website Located At Https://www.sam.gov/portal In Accordance With Far 52.212-3, Offerors Representations And Certifications Commercial Products And Commercial Services. If Paragraph (j) Of The Provision Is Applicable, A Written Submission Is Required. the Following Contract Clauses Apply To This Acquisition: far 52.212-4, Contract Terms And Conditions Commercial Products And Commercial Services (dec 2022) addendum To Far 52.212-4, Contract Terms And Conditions-commercial Products And Commercial Services Applies To And Is Included With This Acquisition. far 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders Commercial Products And Commercial Services (mar 2023) the Following Subparagraphs Of Far 52.212-5 Are Applicable: (b)(4), (5), (9), (12), (18)(i), (25), (26)(i), (29), (31), (33), (34)(i), (36), (39)(i), (40), (46), (51), (55), (59), (c), (5). vaar 852.203-70 Commercial Advertising (may 2018). vaar 852.219-73 Va Notice To Total Set-aside For Certified Service-disabled Veteran-owned Small Businesses (jan 2023) vaar 852.219-75 Va Notice Of Limitations On Subcontracting Certification Of Compliance For Services And Construction. (jan 2023) (deviation) vaar 852.232-72, Electronic Submission Of Payment Requests (nov 2018). this Is Accomplished Through The Tungsten Network Located At: Http://www.fsc.va.gov/einvoice.asp This Is Mandatory And The Sole Method For Submitting Invoices. all Quoters Shall Be Submitted In Accordance With Far 52.212-1, Instructions To Offerors-commercial Products And Commercial Services . (sep 2023) all Quotes Shall Be Sent To The Network Contracting Office (nco) 22 Contract Specialist, Jennell Christofaro At Jennell.christofaro@va.gov. award Will Be Based Upon A Comparative Evaluation Of Quotes In Accordance With The Simplified Acquisition Procedures Of Far 13. Comparative Evaluation Is The Side By Side Pairwise Comparison Of Quotes Based On Factors Resulting In A Contracting Officer Decision For The Quote Most Favorable To The Government. Decision Factors To Be Considered Are Technical Capability, Past Performance, Cost Schedule. This Contract/purchase Order Will Consist Of An Estimated Base Plus Two Option Year Period Of Performance: 03/01/2025 02/29/2028. the Award Will Be Made To The Quote Most Advantageous To The Government And Best Meets The Requirement Described In The Statement Of Work. responses Should Contain Your Best Terms, Conditions. to Facilitate The Award Process, All Quotes Must Include A Statement Regarding The Terms And Conditions Herein As Follows: "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document Without Modification, Deletion, Or Addition." or "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document With The Exception, Deletion, Or Addition Of The Following:" quoters Shall List Exception(s) And Rationale For The Exception(s), If Any. all Rfq Questions Shall Be Received Not Later Than December 26, 2024, 1400 Pst At Jennell.christofaro@va.gov Only. Subject Line Shall Include Inquiry To Rfq 36c26225q0252 For Consideration. All Answers To Inquiries Received By Due Date And Time Will Be Addressed Through An Amendment. No Further Inquiries Will Be Addressed After Due Date. submission Of Your Rfq Response Offer Shall Be Received Not Later Than January 6, 2025, 1400 Pst At Jennell.christofaro@va.gov Only. Subject Line Shall Include Response To Rfq 36c26225q0252 For Consideration. late Submissions Shall Be Treated In Accordance With The Solicitation Provision At Far 52.212-1(f). any Questions Or Concerns Regarding This Solicitation Should Be Forwarded In Writing Via E-mail To The Point Of Contact Listed Below. point Of Contact contract Specialist jennell Christofaro jennell.christofaro@va.gov attachment One: Far 52.212-1 Addendum Instructions To Offerors attachment Two: Far 52.212-2 Evaluation attachment Three: Vaar 852.219-73 Notice Of Total Set-aside For Certified Sdvosb attachment Four: Var 852.219-75 Sdvosb Certification (end Of Provision)
Closing Date6 Jan 2025
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others
United States
Details: This Is A Combined Synopsis/solicitation For Commercial Products And Commercial Services Prepared In Accordance With The Format In Federal Acquisition Regulation (far) Subpart 12.6, Streamlined Procedures For Evaluation And Solicitation For Commercial Products And Commercial Services, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested, And A Written Solicitation Document Will Not Be Issued. this Solicitation Is Issued As An Rfq. The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2024-02, Effective 12/22/2023. this Solicitation Is Set-aside For 100% Small Business (sba). this Is A Firm-fixed Price Contract. the Associated North American Industrial Classification System (naics) Code For This Procurement Is 811210, With A Small Business Size Standard Of $34.0 Million. the Fsc/psc Is J066. the Award Will Be Made To The Quote Most Advantageous To The Government And Best Meets The Requirement Described In The Statement Of Work. price And Other Factors: See Attachment 2, Far 52.212-2 Evaluation statement Of Work contract Title 3500xl Genetic Analyzers And 7500 Fast Polymerase Chain Reaction (pcr) Systems Service Contract the Va Greater Los Angeles Healthcare System (vaglahcs) Requires Annual Maintenance Services On Selected Government Owned 3500xl Genetic Analyzers And 7500 Fast Pcr Systems Equipment At The West La Va Medical Center (wla Vamc). The Services Shall Comply With This Statement Of Work (sow), All Va, Local, State, And Federal Policies, And Regulations. objective the Objective Of This Service Contract Is To Have A Contractor To Furnish All Labor, Materials, Supplies, Tools, Equipment, And Qualified Personnel To Complete Maintenance Services As Per Below Scope. scope the Contractor Shall Provide All Labor, Materials, Freight Costs, And Equipment To Accomplish The Tasks Outlined In This Sow. Contractor Is Responsible For All Subcontractors Required To Complete Reports. all Work Shall Be Performed During Normal Hours Unless Otherwise Approved By The Program Point Of Contact (ppoc) Or His/her Designee. all Work Shall Be In Accordance With Manufacturer S Instructions, Including, But Not Limited To, Adjustments, Calibration, Cleaning, Lubrication, Testing, Disassembly, Checkout, Replacement Of Worn And/ Or Defective Parts, The Above Shall Be Performed As Necessary As Required To Keep Each Equipment In Optimal Working Condition. maintenance And Inspection (pmi) the Contractor Shall Perform Maintenance On The 3500xl Genetic Analyzers And 7500 Fast Pcr Systems According To The Manufacturer Recommendations Unless Otherwise Stated By Ppoc. the Contractor Shall Provide All Preventive Maintenance Replacement Parts At No Cost To The Government. the Contractor Shall Provide All Travel And Transportation Expenses At No Additional Cost To The Government. emergency Repair Services intervening Service Calls Are Calls Placed Outside Regularly Scheduled Preventive Maintenance Service.â  the Contractor Shall Respond On-site As Required Within 2-3 Business Days After Receipt Of A Service Call For Any Instrument Listed.â  response Time Is Applicable For Any Calls Placed Before 2pm Pacific Standard Time.â  failure To Respond Within The Response Time Due To No Fault Of The Government Shall Result In A Prorated Credit Equal To The Proportion Of The Instruments Service Cost For Each Late Day.â  equipment List covered Equipment equipment Name serial Numbers ee# equipment Description 3500xl 24342-140 144937 genetic Analyzer 3500xl 29338-051 177257 genetic Analyzer 7500 Fast 275002720 110018 real Time Pcr System 7500 Fast 275011316 111965 real Time Pcr System 7500 Fast 275013648 134711 real Time Pcr System maintenance Requirements the Contractor Shall Provide On-site Preventive Maintenance And System Calibrations As Necessary To Maintain Recommended Factory Specifications Of The Covered Systems. the Preventive Maintenance Visit Shall Be Scheduled At A Time Agreeable To The Government And Will Be Performed Once Per Year During The Contract Period For Each Equipment Covered. maintenance Shall Be Performed In Accordance With Manufacturer S Instructions. maintenance Shall Be Scheduled A Minimum Of Three (3) Days In Advance With The Ppoc. qualification personnel Performing Maintenance And Repair Services Must Be Fully Qualified, Competent Field Service Engineers (fse) Who Has Been Trained To Perform Work On The Specific Equipment In Accordance With The Original Manufacturer S Maintenance And Repair Procedures. Fully Qualified Is Defined As Factory-trained And Experienced To Work On The Equipment Assigned. additional Requirements contractor Shall Ensure All Equipment Is In Optimal Working Condition At The Expiration Date Of The Contract. contractor Personnel That Perform Changes, Updates, Or Retrofits Made On Any Component, System, Or Equipment Will Log It In The Station Equipment Manual. contractor Will Maintain All Manufactures Manual Necessary To Perform Maintenance. submission Of Reports the Contractor Shall Submit A Complete Field Service Report (fsr) Electronically To The Ppoc Within 7 Calendar Days Of The Work Being Completed. The Fsr At A Minimum Must Contain Company Name, Service Technician S Name, Contact Telephone Number, Date Of Service, A Detailed Description Of Any Services Performed On The Equipment (model Number And Location Included), Serial Number Of The Equipment Being Worked On, Customer Asset Number (ee# - If Applicable) Of The Equipment Being Worked On, Signs Of Misuse Or Neglect, Findings Of Problems And Correction, Including All Performance Verification, Listing Of Replacement Parts, When Applicable; Total Hours Of Service; Safety Check; Performance Data; And Recommendations Necessary To Maintain The Equipment In Optimum Operating Condition. security Requirements the C&a Requirements Do Not Apply, And Security Accreditation Package Is Not Required. this Service Does Not Involve Contractor Connection Of One Or More Contractor-owned It Devices (such As Laptop Computer Or Remote Connection From A Contractor System) To A Va Internal Trusted (i.e., Non-public Network) Therefore Information Technology (it) Security Certification And Accreditation (authorization) (c&a) Requirements Do Not Apply Per Va Handbook 6500.6. period Of Performance base Year, Followed By Two, One-year Options. estimated Start Date: 03/01/2025 Participating Facility: va Greater Los Angeles Healthcare System 11301 Wilshire Blvd. los Angeles, Ca 90073 work Hours normal Hours Of Operation Are Monday Through Friday From 6:00 Am To 6:00 Pm Pacific Time. All Work Is Expected To Be Performed Generally During Normal Hours Of Coverage Unless Requested Or Approved By The Ppoc Or His/her Designee. before Commencement Of Work, The Contractor Shall Confer With The Va Ppoc And Contracting Office To Agree On A Sequence Of Procedures; Means Of Access To Premises And Building. All Work Performed, To Include Delivery Of Materials And Equipment, Shall Be Made With Minimal Interference To Government Operations And Personnel. work Performed Outside The Normal Hours Of Coverage Must Be Approved By The Ppoc Or His/her Designee. all Time Shall Be Approved In Advance By The Ppoc. Allow 5-days For Approval Of Any Alternate Working Hours Needed. federal Holidays new Year S Day january 01 martin Luther King S Birthday third Monday In January president S Day third Monday In February memorial Day last Monday In May juneteenth june 19 independence Day july 04 labor Day first Monday In September columbus Day second Monday In October veterans Day november 11 thanksgiving Day fourth Thursday In November christmas Day december 25 if The Holiday Falls On A Sunday, The Following Monday Will Be Observed As A National Holiday. When A Holiday Falls On A Saturday, The Preceding Friday Is Observed As A National Holiday By U.s. Government Agencies, And Any Day Specifically Declared By The President Of The United States Of America. identification, Check-in, Parking, And Smoking Regulations identification the Vendor's Employees Shall Wear Visible Identification At All Times While On Vaglahcs Premises. Contractor Employees Shall Report To Va Police Upon Entry To The Vaglahcs Facility To Get A Visitor Badge. Contractor Employees Are Required To Be Escorted By The Ppoc Or Designee S Office Once On Campus Prior To Commencement Of Work. During Emergencies Contractor Personnel Shall Check In With Vaglahcs Police If The Vaglahcs Ppoc Or Designee Is Not Available. parking it Is The Responsibility Of The Contract Personnel To Park In The Appropriate Designated Parking Areas. Parking Information Is Available From Va Police & Security Service Office. The Contractor Assumes Full Responsibility For Any Parking Violations. smoking contractor Personnel May Smoke Only In Designated Areas. It Is The Responsibility Of The Visn 22 Healthcare Facilities To Provide A Safe And Healthful Environment For Employees And Patients And To Serve As A Leader In Community Health Awareness And Education. It Is In Fulfillment Of This Obligation That The Facilities Are Committed To The Establishment Of A Smoke-free Environment. This Policy Applies To Every Location In The Healthcare Facilities. There Shall Be No Smoking Within 25 Feet Of All Entrances To Buildings. Smoking Is Allowed In All Outside Areas That Are 25 Feet Away From Entrances To Buildings Unless Indicated Otherwise. Enclosed Patios Connected To Facility Buildings Are Considered Part Of The Building And As Such Are Non-smoking Areas. weapons And Contraband possession Of Weapons Or Contraband Is Prohibited And Shall Be Subject To Arrest And Termination From Future Performance Under This Contract. Enclosed Containers, Including Tool Kits, Shall Be Subject To Search. Violations Of Vaglahcs Regulations May Result In Citation Answerable In The United States (federal) District Court, Not A Local District, State, Or Municipal Court. safety all Personnel Employed By The Contractor In The Performance Of This Contract, Or Any Representative Of The Contractor Entering On Vaglahcs Shall Comply With Applicable Federal, State, And Va Safety And Fire Regulations And Codes, Which Are In Effect During The Performance Period Of The Contract. contractor Shall Perform Work In Strict Accordance With Existing Relevant, Accredited Standards And Codes To Minimize The Possibility Of Injury To Personnel, Or Damage To Government Equipment. Every Effort Shall Be Made To Safeguard Human Life And Property. contractor Shall Comply With All Applicable Federal, State, And Local Requirements Regarding Workers Health And Safety. The Requirements Include, But Are Not Limited To, Those Found In Federal And State Occupational Safety And Health Act (osha) Statutes And Regulations, Such As Applicable Provisions Of Title 29, Code Of Federal Regulations (cfr), Parts 1910 And 1926, Nfpa 70e, Article 130.7 29 Cfr 1910.132(d)(1)(iii), 29cfr1910.137. contractor Shall Provide All Necessary Tools, And Personal Protective Equipment (ppe) To Perform The Work Safely, Effectively, And Timely. contractor Personnel contractor S Program Manager the Contractor Shall Provide A Contract Program Manager Who Shall Be Responsible For The Performance Of The Work. The Name Of This Person Shall Be Designated In Writing To The Contracting Officer. The Contractor S Program Manager Shall Have Full Authority To Act For The Contractor On All Contract Matters Relating To Daily Operation Of This Contract. contractor S Employees the Contractor Shall Not Employ Persons For Work On This Contract If Such Employee Is Identified To The Contractor As A Potential Threat To The Health, Safety, Security, General Well-being Or Operational Mission Of The Installation And Its Population. contract Personnel Shall Be Subject To The Same Quality Assurance Standards Or Exceed Current Recognized National Standards As Established By The Joint Commission (jc). contractor Qualifications & Other Responsibilities contractor Shall Obtain All Necessary Licenses Required To Perform This Work. Contractor Shall Take All Precautions Necessary To Protect Persons And Property From Injury Or Damage During The Performance Of This Contract. Contractor Shall Be Responsible For Any Injury To Himself/herself, His/her Employees, Or Others, As Well As For Any Damage To Personal Or Public Property That Occurs During The Performance Of This Contract That Is Caused By Him/her Or His/her Employees Fault Or Negligence. Contractor Shall Maintain Personal Liability And Property Damage Insurance Prescribed By The Laws Of The Federal Government. the Government Reserves The Right To Accept Or Reject Contractor S Employee For The Rendering Of Services. Complaints Concerning Contract Personnel S Performance Or Conduct Will Be Dealt With By The Contractor And Cor With The Final Decision Being Made By The Contracting Officer. invoicing And Payment overtime & Holiday Pay any Overtime And/or Holiday Pay That May Be Entitled To The Contractor S Employees Shall Be The Sole Responsibility Of The Contractor And Shall Not Be Billed To Nor Reimbursed By The Government. Contractor Will Bill And Be Paid For Actual Services Provided By Contractor Personnel. Contractor Will Not Be Paid For Availability Or On-call Services Unless Otherwise Provided Herein. invoices payment Of Services Rendered Under This Contract Shall Be Made In Arrears Upon Satisfactory Completion Of Each Service And Receipt Of A Properly Prepared Invoice And Submitted By The Contractor To The Payment Address Specified By Contracting. Invoices Shall Reference The Contract Number And Purchase Order Number, Manifest Number(s), Provide A Complete And Accurate Description Of Services/ Supplies Delivered/ Rendered, Including Dates Of Performance, Amounts, Unit Prices, Extended Totals And Any Other Data Relevant For Payment Purposes. the Government Shall Not Authorize Payment Until Such Time That The Vaglahcs Ppoc All Properly Executed And Signed Documentation. no Advance Payments Shall Be Authorized. Payment Shall Be Made On A Monthly Arrears For Services Provided During The Billing Month In Arrears. Upon Submission Of A Properly Prepared Invoice For Prices Stipulated In This Contract For Services Delivered And Accepted In Accordance With The Terms And Conditions Of The Contract, Less Any Deductions Stipulated In This Contract. payment Of Invoices May Be Delayed If The Appropriate Invoices As Specified In The Contract Are Not Completed And Submitted As Required. ***price/cost Schedule*** base Year line Item description quantity unit Of Measure unit Price total Price 0001 preventative/corrective Maintenance, Inspection And Repair- Genetic Analyzer 3500xl Sn: 24342-140 1 yr 0002 preventative/corrective Maintenance, Inspection And Repair- Genetic Analyzer 3500xl Sn: 29338-051 1 yr 0003 preventative/corrective Maintenance, Inspection And Repair- Real Time Pcr System 7500 Fast Sn: 275002720 1 yr 0004 preventative/corrective Maintenance, Inspection And Repair- Real Time Pcr System 7500 Fast Sn: 275011316 1 yr 0005 preventative/corrective Maintenance, Inspection And Repair- Real Time Pcr System 7500 Fast Sn: 275013648 1 yr 0006 emergency Repairs, Costs In Relation To Finding From Inspections. 1 jb 0.00 0.00 option Year 1 line Item description quantity unit Of Measure unit Price total Price 1001 preventative/corrective Maintenance, Inspection And Repair- Genetic Analyzer 3500xl Sn: 24342-140 1 yr 1002 preventative/corrective Maintenance, Inspection And Repair- Genetic Analyzer 3500xl Sn: 29338-051 1 yr 1003 preventative/corrective Maintenance, Inspection And Repair- Real Time Pcr System 7500 Fast Sn: 275002720 1 yr 1004 preventative/corrective Maintenance, Inspection And Repair- Real Time Pcr System 7500 Fast Sn: 275011316 1 yr 1005 preventative/corrective Maintenance, Inspection And Repair- Real Time Pcr System 7500 Fast Sn: 275013648 1 yr 1006 emergency Repairs, Costs In Relation To Finding From Inspections. 1 jb 0.00 0.00 option Year 2 line Item description quantity unit Of Measure unit Price total Price 2001 preventative/corrective Maintenance, Inspection And Repair- Genetic Analyzer 3500xl Sn: 24342-140 1 yr 2002 preventative/corrective Maintenance, Inspection And Repair- Genetic Analyzer 3500xl Sn: 29338-051 1 yr 2003 preventative/corrective Maintenance, Inspection And Repair- Real Time Pcr System 7500 Fast Sn: 275002720 1 yr 2004 preventative/corrective Maintenance, Inspection And Repair- Real Time Pcr System 7500 Fast Sn: 275011316 1 yr 2005 preventative/corrective Maintenance, Inspection And Repair- Real Time Pcr System 7500 Fast Sn: 275013648 1 yr 2006 emergency Repairs, Costs In Relation To Finding From Inspections. 1 jb 0.00 0.00 **please Use The Format Above For Pricing** the Following Solicitation Provisions Apply To This Acquisition: far 52.212-1, Instructions To Offerors Commercial Products And Commercial Services far 52.212-3, Offerors Representations And Certifications Commercial Products And Commercial Services offerors Must Complete Annual Representations And Certifications Electronically Via The System For Award Management (sam) Website Located At Https://www.sam.gov/portal In Accordance With Far 52.212-3, Offerors Representations And Certifications Commercial Products And Commercial Services. If Paragraph (j) Of The Provision Is Applicable, A Written Submission Is Required. the Following Contract Clauses Apply To This Acquisition: far 52.212-4, Contract Terms And Conditions Commercial Products And Commercial Services (dec 2022) addendum To Far 52.212-4, Contract Terms And Conditions-commercial Products And Commercial Services Applies To And Is Included With This Acquisition. far 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders Commercial Products And Commercial Services (mar 2023) the Following Subparagraphs Of Far 52.212-5 Are Applicable: (b)(4), (5), (9), (12), (18)(i), (26)(i), (29), (31), (33), (34)(i), (36)(i), (39)(i), (40), (46), (51), (55), (59), (c), (5). vaar 852.203-70 Commercial Advertising (may 2018). vaar 852.219-75 Va Notice Of Limitations On Subcontracting Certification Of Compliance For Services And Construction. (jan 2023) (deviation) vaar 852.232-72, Electronic Submission Of Payment Requests (nov 2018). this Is Accomplished Through The Tungsten Network Located At: Http://www.fsc.va.gov/einvoice.asp This Is Mandatory And The Sole Method For Submitting Invoices. all Quoters Shall Be Submitted In Accordance With Far 52.212-1, Instructions To Offerors-commercial Products And Commercial Services . (sep 2023) all Quotes Shall Be Sent To The Network Contracting Office (nco) 22 Contract Specialist, Jennell Christofaro At Jennell.christofaro@va.gov. award Will Be Based Upon A Comparative Evaluation Of Quotes In Accordance With The Simplified Acquisition Procedures Of Far 13. Comparative Evaluation Is The Side By Side Pairwise Comparison Of Quotes Based On Factors Resulting In A Contracting Officer Decision For The Quote Most Favorable To The Government. Decision Factors To Be Considered Are Technical Capability, Past Performance, Cost Schedule. Quote Evaluations For Technical Capability Will Be Based On The Following: Capabilities Statement: Interested Offeror Can Perform The Tasks Listed In The Statement Of Work; Past Performance: Prior Experience In Maintaining Equipment Listed In Statement Of Work; Qualifications: Personnel Performing Maintenance And Repair Services Must Be Fully Qualified, Competent Field Service Engineers (fse) Who Has Been Trained To Perform Work On The Specific Equipment In Accordance With The Original Manufacturer S Maintenance And Repair Procedures. Fully Qualified Is Defined As Factory-trained And Experienced To Work On The Equipment Assigned. this Contract/purchase Order Will Consist Of An Estimated Base Plus Two Option Year Period Of Performance: 03/01/2025 02/29/2028. the Award Will Be Made To The Quote Most Advantageous To The Government And Best Meets The Requirement Described In The Statement Of Work. responses Should Contain Your Best Terms, Conditions. to Facilitate The Award Process, All Quotes Must Include A Statement Regarding The Terms And Conditions Herein As Follows: "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document Without Modification, Deletion, Or Addition." or "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document With The Exception, Deletion, Or Addition Of The Following:" quoters Shall List Exception(s) And Rationale For The Exception(s), If Any. no Inquiries Will Be Addressed For This Rfq Solicitation 36c26225q0319. submission Of Your Rfq Response Offer Shall Be Received Not Later Than January 21, 2025, 1400 Pst At Jennell.christofaro@va.gov Only. Subject Line Shall Include Response To Rfq 36c26225q0319 For Consideration. late Submissions Shall Be Treated In Accordance With The Solicitation Provision At Far 52.212-1(f). any Questions Or Concerns Regarding This Solicitation Should Be Forwarded In Writing Via E-mail To The Point Of Contact Listed Below. point Of Contact contract Specialist jennell Christofaro jennell.christofaro@va.gov attachment One: Far 52.212-1 Addendum Instructions To Offerors attachment Two: Far 52.212-2 Evaluation attachment Three: Var 852.219-75 Sdvosb Certification
Closing Date21 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Aerospace and Defence
Corrigendum : Closing Date Modified
United States
Details: Update 1/14/2024: The Rfi Has Been Updated To Provide New Information On The Government's Intended Contracting Path Forward And Ask Updated Questions Based On Narrowing Down The Acquisition Strategy. Tdp Updates Are Also Anticipated To Be Added To The Bidder's Library In The Near Future And Primary Pocs Have Been Updated. There Are Edits Throughout This Rfi So Please Read In It's Entirety. update 4/1/2024: The Unclassified Bidder's Library With Draft Tdp Is Now Available To Industry. For Those Interested In Access, Please Submit The Signed Terms Of Use Agreement, Dd 2345, And A Capabilities Statment, If Those Have Not Already Been Provided As Well As A Request For Bidder's Library Access Via E-mail To Brittany Burton, (brittany.m.burton4.civ@us.navy.mil), And Tom Kostyo (thomas.f.kostyo.civ@us.navy.mil), With A Copy To The Contracting Officer, Ms. Holly Danner (holly.r.danner.civ@us.navy.mil). section 1: Synopsis the Naval Sea System Command (navsea) Is Hereby Issuing A Sources Sought Request For Information (rfi) On Behalf Of The Program Executive Office Integrated Warfare Systems Above Water Sensors Directorate (peo Iws 2.0). Navsea Is Issuing This Announcement As Part Of A Market Survey For The An/spy-6 Radar Variants. This Includes The Air And Missile Defense Radar (amdr) (an/spy-6(v)1) For Ddg-51 Flt Iii, The Amdr Backfit Radar For Ddg-51 Flt Iia (an/spy-6(v)4), The Enterprise Air Surveillance Radar (easr) Rotator (an/spy-6(v)2), And The Easr Fixed Face (an/spy-6(v)3). For Convenience, The Term “spy-6” Is Used In This Rfi To Refer To All Noted Radar Variants. the Spy-6 Variant Radars Are Built Upon Common Hardware Line Replaceable Units (lrus) Using Modular, Open System Principles. It Is Peo Iws 2.0’s Intent To Competitively Award A Multi-award Indefinite Delivery Indefinite Quantity (idiq) Contract To Procure And Supportan/spy-6(v) Radars As Early As Fy27, But Nlt Fy28. The Basis For Production Of Spy-6 Hardware Is Contained In The Technical Data Package (tdp), Which Is Currently Available In Draft Form As Government Furnished Information (gfi). Multi Award Contract (mac) Idiq Scope Will Include “build-to-print" Production Where Applicable For All Variants Of Spy-6, And May Include Technology Refresh, Obsolescence Resolution, And Additional Development Support. The Term “build-to-print" In This Context Means Producing To The Exact Specifications, Drawings, And Design Contained Within The Tdp, With Modifications Allowed Only For The Purposes Of Addressing Obsolescence, Non-compliances With The System Specifications (a-specifications), And Reducing Life-cycle Cost Of All Spy-6 Radars To Be Fielded. the Government Intends To Compete Requirements For Breakouts Of Lrus Or Subsystems Via Multiple Delivery Or Task Order Within The Idiq. Feedback Is Desired From Industry On This Strategy, The Potential Lrus To Be Competed Separately, And Individual Interest In Each Of The Potential Breakouts. Final Contract Types Have Not Yet Been Determined But May Be Fixed-price Incentive, Firm-fixed Price, Or Some Combination Thereof, With The Potential For Other Incentives To Be Determined. Currently The Government Is Interested In Scheduling 1:1 Discussions With Industry Companies That Are Interested In Participation At The Full Subsystem Level. Future Opportunities Will Be Available For Interested Subcontractor Participation. section 2: General Information pursuant To Far 52.215-3 This Is A Request For Information (rfi) Notice Only. This Rfi Is For Planning Purposes And Is Issued Solely For Conducting Market Research In Accordance With Far Part 10. The Government Is Not Seeking Or Accepting Unsolicited Proposals. This Notice Shall Not Be Construed As A Contract, A Promise To Contract, Or A Commitment Of Any Kind By The Government. Specific Responses Will Not Disqualify Or Have An Impact On Participation And Evaluation On Future Solicitations. Not Responding To This Rfi Does Not Preclude Participation In Any Future Solicitation. If A Solicitation Is Issued In The Future, It Will Be Announced Via The System For Award Management (sam.gov) Website And Interested Parties Must Comply With That Announcement. It Is The Responsibility Of Interested Parties To Monitor Sam For Additional Information Pertaining To This Requirement. any Small Businesses That Believe They Can Accomplish This Entire Requirement Should Indicate Their Small Business Status (see Far Part 19) In Their Response. peo Iws 2.0 Representatives May Or May Not Choose To Meet With Rfi Respondents. Such Discussions Would Only Be Intended To Get Further Clarification Of Potential Capability To Meet The Requirements. questions Regarding This Announcement Shall Be Submitted In Writing Via E-mail To The Contract Specialist And Contracting Officer’s Email Addresses (listed In Section 5 Below). Verbal Questions Will Not Be Accepted. Questions Shall Not Contain Classified Information. section 3: Requirements Overview a Brief Overview Of The Spy-6 Variant Mission Requirements And Array Configuration Is Provided As Follows: an/spy-6(v)1 Is Designed To Meet Mission Performance And Size, Weight, And Power – Cooling (swap-c) Requirements Of The Ddg-51 Flt Iii Ships With Aegis Baseline 10 (bl 10) Combat System. The An/spy-6(v)1 Will Provide Volume Search, Tracking, Ballistic Missile Defense (bmd) Discrimination, And Missile Communications In A Wide Diversity Of Environments And Conditions. This Variant Includes 37 Radar Modular Assemblies (rmas) Per Array, Each Which Contain Independent Transmit And Receive Lrus And Provide Spy +16 Minimum Sensitivity. There Are 4 Arrays Per Shipset. an/spy-6(v)2 Is Designed To Meet Air Defense And Air Traffic Control Mission Performance And Swap-c Requirements Of The Cvn (nimitz) Class Carriers, Landing Helicopter Assault (lha) Hulls, And Landing Platform/dock (lpd) Hulls. This Variant Includes A Single Array On A Rotating Platform, With 9 Rmas. an/spy-6(v)3 Is Designed To Meet Air Defense And Air Traffic Control Mission Performance And Size, Weight, And Power – Cooling (swap-c) Requirements Of Cvn (ford) Class Carriers And Will Additionally Provide Engagement Support For Future Frigate (ffg(x)) Hulls. This Variant Includes 9 Rmas Per Array With 3 Arrays Per Shipset. an/spy-6(v)4 Is Designed To Meet Mission Performance And Swap-c Requirements Of The Ddg-51 Flt Iia Ships With A Variant Of Aegis Baseline 10 (bl 10) Combat System, To Be Defined. The An/spy-6(v)4 Will Provide Volume Search, Tracking, Bmd Discrimination, And Missile Communications In A Wide Diversity Of Environments And Conditions. This Variant Includes 24 Rmas Per Array With 4 Arrays Per Shipset. the Notional Shipset Procurement Schedule (including Potential Fy27-30 Fms) For The Above Spy-6 Variants Is: spy-6 Variant Fy27 Fy27 Fy28 Fy29 Fy30 Fy31 Fy32 Fy33 Fy34 Fy35 an/spy-6(v)1 2-6 2-4 2-4 2-4 2 2 2 2 2 2 an/spy-6(v)2 0-2 1-6 0-5 0-1 2 0 0 1 0 0 an/spy-6(v)3 1-3 2-3 1-4 1 2 1 1 0 0 1 an/spy-6(v)4 2 2-5 2-3 2-3 2 2 2 2 2 2 unit Totals 5-13 7-18 5-16 6-9 8 5 5 5 4 5 quantity Note: The Government Is Considering Capturing Potential Fms Quantities In Fy27-fy30 Options On This Future Contract Action, Which Drives The Upper-range Uncertainty. Multiple Countries Have Expressed Interest In Procuring Spy-6 Variants, But No Formal Fms Cases Are In Progress. There Is Potential For Fms Quantities Beyond Fy30. Usn Quantities Drive The Lower End Of The Range And Are Stable Through Fy29, With Increased Potential For Changes Beyond. for Context, The Fy16-25 Spy-6 Contract Procurement Schedules Are As Follows: spy-6 Variant Fy16 Fy17 Fy18 Fy19 Fy20 Fy21 Fy22 Fy23 Fy24 Fy25 Totals an/spy-6(v)1 1 2 1 3 2 0 3 2 2 2 18 an/spy-6(v)2 0 0 0 0 4 0 2 2 2 0 10 an/spy-6(v)3 0 0 0 0 2 0 2 1 2 1 8 an/spy-6(v)4 0 0 0 0 0 0 0 1 1 2 4 unit Totals 1 2 1 3 8 0 7 6 7 5 40 the Government Is Interested In Procuring Spy-6 Radar Lrus From Offerors That Have The Following Attributes: have Past Experience Developing And Manufacturing Complex Radar Systems Or Subsystems, Including S-band Radio Frequency (rf) Electronics, Digital Communications Networks, X86 Processing Nodes, High-voltage Power Distribution And Conditioning Systems, High-capacity Cooling Units, And Array Structures. have Demonstrated The Ability To Produce Hardware Units According To Detailed Technical Data Package Materials Provided To Them. experience Teaming With Industry Partners For Subsystem Development experience Cooperating With Other Prime Industry Partners Integrating Complex Systems. experience Maintaining Fielded Navy Hardware Systems. the Government Contemplates Acquisition Via The Following Separate Delivery/task Orders Within The Idiq For Production: digital Receiver/exciter (drex) Lrus transmit/receive Integrated Microwave Module (trimm) Lrus prime Power Equipment (ppe) Subsystems production Integrator, Including Remainder Of Radar Subsystem Procurements level-of-effort Labor Hours/odcs For Engineering Support Tasking As Necessary Via Technical Instruction section 4: Submission Of Responses the Government Is Not Requiring Written Responses, Although Written Responses Will Be Accepted. The Government Seeks To Have A One-on-one Discussion With Each Interested Company That Would Participate As A Prime Contractor For One Or More Delivery Orders To Further Discuss This Rfi And Receive Industry Responses. The Government Also Intends To Schedule One Or More Virtual Industry Days In The Future Which Would Allow For Participation Of Interested Subcontractors As Well As Interested Prime Contractors. responses To This Rfi Should Be Submitted By The Closing Date And Time Via E-mail To Spencer Bryant, Contract Specialist (spencer.m.bryant2.civ@us.navy.mil), And Tom Kostyo (thomas.f.kostyo.civ@us.navy.mil), With A Copy To The Contracting Officer, Holly Danner (holly.r.danner.civ@us.navy.mil) section 4.1: Content written Responses Are Not Required, With Exception Of A Capability Statement And Request For A One-on-one Meeting. Companies That Submitted A Capability Statement To The Previous Rfi Are Not Required To Resubmit. Companies That Optionally Choose To Respond To This Rfi In Writing Should Provide A Response Not To Exceed Thirty (30) Pages. cover Sheet, Company Profile, Table Of Contents, And List Of Abbreviations And Acronyms Are Exempt From The Page Limit. A Detailed Proposal Is Not Requested. Responses Should Indicate Sufficient Detail For Assessment Of Potential Contracting Strategies And Company Interest; Submissions Should Be Organized As Follows: cover Sheet - Rfi Number And Name, Address, Company, Technical Point Of Contact, With Printed Name, Title, Email Address, Telephone Number, And Date company Profile - Include The Following Information: company Name company Address commercial And Government Entity (cage) Code point Of Contact e-mail Address website Address telephone Number business Category (i.e., Large, Small Disadvantaged, Veteran, Woman Owned, Etc.) please Advise If You Would Like To Be Publicly Disclosed As An Interested Party Through This Fbo Notice In An Effort To Foster Industry Teaming Possibilities. table Of Contents, With List Of Figures And Tables With Page Numbers general Response Information list Of Abbreviations And Acronyms product Line Brochures, Catalog Excerpts, Etc. May Be Submitted And Referenced Within The General Capability Statement And Are Exempt From The Page Limit. the Government Wishes To Address The Following Questions In One-on-one Sessions (any Questions Answered In The Previous Rfi Do Not Need To Be Discussed Again In One-on-ones Unless Information Has Changed): do You Have Past Experience Procuring/producing Build To Print Hardware? If So, Are There Any Recommended Lessons Learned For The Government To Incorporate Into The Contracting Strategy? what Manufacturing Facilities Does Your Organization Have And What Product Lines Have Been Developed In These Facilities In The Past? do You See Utility In The Government Pursuing A Multiple Award Strategy With Break-outs Of The Radar Subsystems? Are There Additional Strategies You Would Suggest Or Specific Parameters You Would Suggest To Increase Your Interest In Competing? would You Prefer To Bid On An Entire Spy-6 System Or A Subset? If Subset, Which Subsystem(s) Or Lrus Would You Be Interested In Bidding? Do You Believe There Is Utility In Breaking Out A Different Subset Of Components From The Government’s Initial Set? would You Be Willing To Compete On A Multi-award Idiq Contract? in The Event Of Breaking Up The System Into Separate Sources, The Government Envisions A “production Integrator” To Produce Any Components From The Tdp Not Separately Sourced, The “production Integrator” Would Also Potentially Support The Government In Management Of Subsystem Sources, And Complete The Remaining Production Scope (e.g. Configuration Management, Planning, Array Integration And Test). What Considerations Do You Have For This Role And How It Would Be Contracted? Would This Be A Role Your Company Is Interested Bidding For? If This Role Did Not Include Other Subsystem Production, Would Your Company Be Interested In Competing? Is There A Particular Mix Of Subsystems That, When Combined With This Role, Would Make Competing For This More Enticing To Your Company? would Your Company’s Interest Change If Technology Refresh Scope Were Included? would Your Company’s Interest Change If Firmware, Software, Or Any Other Development Scope Were Included? what Timeframes Does Your Organization Believe Are Appropriate For Proposal Preparation, And Time From Contract Award To First Production Unit Delivery? Please Specify This Timeline For Each/any Lrus Your Company Is Interested In. what Minimum Time Does Your Organization Require With The Tdp Prior To Submitting A Proposal? do You Have Suggestions For Ways To Reduce System Cost Other Than Through Competition? what Upgrades Does Your Organization Already Have Planned For Manufacturing Facilities? How Would Preparing For This Competition Change Those Plans? How Would Being Awarded A Contract Change Those Plans? what Flexibility Does Your Organization Have In Production Processes To Adjust/adapt To Increasing/decreasing Number Of Production Units? what Near-field Range (nfr) Facilities Does Your Organization Own Or Have Access To? what Rf Circuit Card Assembly Facilities Does Your Organization Own Or Have Access To? How Much Production Capacity Is Available To Support Projected Demand? If Needed What Approach Would You Take For Increasing Capacity? What Manufacturing Processes Does Your Organization’s Facilities Support (e.g. Surface Mount Technology (smt), Wire Bond, Etc)? what Is Your Organization’s Experience With Non-hermetic Monolithic Microwave Integrated Circuit (mmic) Processing And Assembly? if You Are Teaming, How Would Your Organization Manage Subcontractors/teammates To Ensure That The Performance Requirements Are Flowed Down And Met? does Your Organization Have The Ability For The Government To Procure Additional Parts On A Provisioned Items Order (pio) For The Use As Spares? what Would Your Organization Recommend For Production Lead Times To Delivery Of A System Or Subsystem(s) To A Shipyard Or Land-based Facility For Each Of The Spy-6 Variants And Why? Would The Delivery Date Months After Option Exercise (maoe) Decrease Based On A Learning Curve Over Time? Would Delivery Date Maoe Adjust Based On The Number Of Units, Potentially Similar And Different Variants, Being Exercised At The Same Time? would Your Organization Recommend Procuring Equipment In Blocks Or Individually Based On The Needed Delivery Date? If Recommendation Is As A Block, What Is Your Recommendation For Structuring The Block So That It Can Adapt To The Appropriate Number Of Units? what Support Equipment And/or Test Assets Would Your Organization Utilize To Support Hardware Production And Quality Assessments? If Support Equipment And/or Test Assets Are Required, Would Existing Contractor Assets Be Available? If Not, What Would Be Your Approach To Obtain The Equipment? are There Any Cost/pricing Considerations You Would Like To Bring To The Government’s Attention? Do You Have Any Recommendations On The Structure Of The Requirements Or The Overall Contracting Strategy That Would Reduce The Total Price? What Performance Incentive Structure And Growth Would Your Organization Recommend And Why? do The Potential Fms Quantities Affect Or Change Your Answers To Any Of The Above Questions? Are There Specific Considerations You Would Like To Raise With Relation To The Potential Fms Units? if You’ve Reviewed The Gfi Tdp, What Additional Data, If Any, Would Your Organization Believe Is Necessary To Successfully Procure Andproduce Spy-6 Hardware? respondents Are Solely Responsible For Properly Marking And Clearly Identifying Any Proprietary Information Or Trade Secrets Contained Within Their Responses. The Government Will Not Be Liable, Or Suffer Any Consequential Damages, For Any Proprietary Information Not Properly Marked And Clearly Identified. Proprietary Information Received In Response To This Rfi Will Be Safeguarded And Handled In Accordance With Applicable Government Regulations. section 4.2: Classification all Materials Submitted In Response To This Rfi Should Be Unclassified. if A Potential Respondent Believes Submission Of Classified Material Is Necessary Or Will Provide A Higher Quality Response, Please Contact Spencer Bryant, Contract Specialist (spencer.m.bryant2.civ@us.navy.mil), And Tom Kostyo (thomas.f.kostyo.civ@us.navy.mil), With A Copy To The Contracting Officer, Holly Danner (holly.r.danner.civ@us.navy.mil). section 4.3: Formatting(if Optional Written Responses Are Provided) navsea Will Accept Only Electronic Unclassified Submission Of Responses. respondents To This Rfi Must Adhere To The Following Details: submissions Shall Be Single Spaced, Typed Or Printed In Times New Roman Font With Type No Smaller Than 12-point Font. pages Should Be 8 1/2 X 11 Inches With A Minimum Of 1 Inch Margins Around The Page. Any Text Contained Within Tables, Graphs, Etc. Should Be 8-point Times New Roman Font Or Larger. included Files Should Be Created/prepared Using Microsoft Office 2016 Compatible Applications. Graphics, Photographs, And Other Data That May Not Be Compatible With Microsoft Office 2016 Should Be Submitted In Adobe Acrobat Format. submitted Electronic Files Should Be Limited To The Following Extensions: .docx Microsoft Word .xlsx Microsoft Excel .pptx Microsoft Powerpoint .pdf Adobe Acrobat .mmpx Microsoft Project submitted Electronic Files Should Not Be Compressed. section 5: Requesting Government Furnished Information (gfi) the Government Has Established A Bidder’s Library With Draft Tdp Material. The Government Anticipates Additional Rfis/industry Days With Opportunities To Comment On The Gfi Or Amend Rfi Responses In The Future. To Obtain Access To The Bidder’s Library, Interested Companies Shall Provide A Current Copy Of Their Approved Dd Form 2345, Military Critical Technical Data Agreement Verifying Eligibility And Authority To Receive Export-controlled Information. In Addition, Interested Companies Must Complete The Terms Of Use Agreement (attachment 1 Of This Rfi). The Dd Form 2345 And Completed Terms Of Use Agreement Shall Be Submitted Via Email To Spencer Bryant, Contract Specialist (spencer.m.bryant2.civ@us.navy.mil), And Tom Kostyo (thomas.f.kostyo.civ@us.navy.mil), With A Copy To The Contracting Officer, Holly Danner (holly.r.danner.civ@us.navy.mil). Upon Receipt And Approval, The Gfi Will Be Provided. important: For Purposes Of This Rfi, Each Company Must Be Able To Receive Classified Documents Up To The Secret Level. However, The Government Intends To Include Classified Attachments At The Top Secret/sci/u.s. Only Level Included As Part Of Any Future Solicitation. Therefore, Prime Contractors Interested In Bidding Under Any Subsequent Solicitation Must Be Able To Receive Classified Documents Up To The Top Secret/sci Level And Must Be A United States (u.s.) Company Or An Independent U.s. Subsidiary. The Navy Will Consider Foreign Contractors Acting As Subcontractors To U.s. Prime Contractors. The Export Of Defense Articles, Defense Services, And Related Technical Data Is Subject To The Arms Export Control Act And The International Traffic In Arms Regulations (itar) And Requires The Issuance Of An Export License By The U.s. Department Of State. please Make The Request As Soon As Practicable As It May Take Several Days For The Government To Review And Approve Access To The Documents.
Closing Date14 Feb 2025
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others
United States
Details: This Is A Combined Synopsis/solicitation For Commercial Products And Commercial Services Prepared In Accordance With The Format In Federal Acquisition Regulation (far) Subpart 12.6, Streamlined Procedures For Evaluation And Solicitation For Commercial Products And Commercial Services, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested, And A Written Solicitation Document Will Not Be Issued. this Solicitation Is Issued As An Rfq. The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2025-01. this Solicitation Is Set-aside For 100% For Small Business Concerns Iaw Far 19.502-2, Total Small Business Set-asides. the Associated North American Industrial Classification System (naics) Code For This Procurement Is 541380, With A Small Business Size Standard Of $19.0 Million. The Fsc/psc Is Q301. va Loma Linda Healthcare System (vallhcs) Located At 11201 Benton St, Loma Linda, Ca 92357 Is Seeking A Potential Qualified Contractor That Can Provide Inspection & Certification Of Fume Hoods, Ventilators, Biological Safety Cabinets, And Isolators. all Interested Entities Shall Provide Quotations For The Following: title: va Loma Linda Healthcare System (vallhcs) Inspection & Certification Of Fume Hoods, Ventilators, Biological Safety Cabinets, And Isolators. background Information: vallhcs Provides High Quality Care While Ensuring The Safety Of Its Staff, Patients, And Visitors. A Critical Component Of This Commitment Involves Ensuring That All Fume Hoods, Ventilators, Biological Safety Cabinets, And Isolators Within The Va Facilities Are Functioning Optimally And Meet Applicable Regulatory Standards. Regular Inspection And Certification Of This Equipment Are Essential For Supporting Clinical, Research, And Pharmaceutical Operations While Protecting Personnel And The Environment From Hazardous Materials. objectives: the Objective Of This Contract Is To Engage A Certified Contractor With Proven Expertise To Provide Monthly, Bi-annual Inspections, Certification, Testing And Maintenance Services For All Fume Hoods, Ventilators, Biological Safety Cabinets, Viable Particle Surface And Air Sampling And Analysis For Medium Risk Facilities And Isolators Within The Vallhs Facilities. The Contractor Will Ensure All Equipment Meets Or Exceeds Current Regulatory And Safety Standards, Including But Not Limited To Those Set By The National Fire Protection Association (nfpa), Occupational Safety And Health Administration (osha), And U.s Pharmacopeia (usp) scope: the Contractor Shall Provide All Parts Labor, Transportation, Equipment, Supervision, And Certified Personnel To Perform On-site Bi-annual And Monthly Inspections And Certifications Of Government-owned Fume Hoods, Ventilation Devices, Biological Safety Cabinets (bsc), Laminar Flow Devices, Isolators, Biosafety Hazard Hoods, Sterile Workbenches, Radiation safety Hoods, Buffer, Ante Spaces, And Pharmacy Clean Rooms (see Section 6.1). The Contractors Shall Be Responsible For Removing Or Disposing Of Hazmat. the Contractor Shall Provide Bi-annual Or Monthly Inspections, Certifications And Testing On The Equipment Listed Below: manufacturer type s/n item Number location labonco 3620904 020119684e 26754 2c05 lab Equip Co h7-48 h7-48h 40092 2c05 lab Equip Co h7-48g h7-48g unk 2c07 labonco 36209-00 247536 40138 2c07 fisher fb-pcr2 1591080398158 41427 2c22 lab Equip Co h7-48d h7-48d 40096 2c24 lab Equip Co h7-48e h7-48e 40094 2c22 lab Equip Co h7-48c h7-48c 40095 2c25 lab Equip Co h7-48b h7-48b 40097 2c26 labonco premier 160729357b unk 2c27 labonco premier 160729358b unk 2c28 labonco 3440000 070976549 39977 2c29 labonco premier 160729356b unk 2c30 lab Equip Co h7-48s h7-48s 40112 3c28 lab Equip Co h7-48r h7-48r 40111 3c27 labonco h7-48cc h7-48cc 40122 4c22b forma Scientific 1284 18565-370 45031 4c22b labonco 36209-08 257688 16334 4c22b lab Equip Co h7-48aa h7-48aa 40124 4c25 lab Equip Co h7-48v h7-48v unk 4c02 labonco 36209-00 214517 9615 4c02 lab Equip Co h7-48u h7-48u 40118 4c03 lab Equip Co h7-48y h7-48y unk 4c04 labonco 3620904 010916879e 45029 4c04 lab Equip Co h7-48w h7-48w unk 4c05 usa Scientific ac648lfuvc 42337 44237 4c05 lab Equip Co h7-48x h7-48x 40121 4c06 fisher Scientific pcr - unk 4c06 mopec - me400l09002 45782 1b25 lab Equip Co h7-48z h7-48z 6946 4c07 labonco 3440000 070976500 39976 4c07 bmc 6315-08 1dla-26 45027 1b28 labonco 3440809 080891842b 45030 4c07 lab Equip Co h3-72 143-72 45022 1b49 labonco 36209-01 192918 8742 4c07 labgard nv-629-600 12697011108 43090 1b28c bmc 6315-08 1llb-38 45018 1b51a bmc 6315-08 1llb-28 45019 1b51a bmc 6315-08 1llc-2 45020 1b51h bmc 6315-08 1llb-15 45017 1b50a bmc 6315-08 1llb-9 45016 1b50 bmc 6315-08 1lla-21 45015 1b50 labgard nv-629-600 126966111008 43091 1b30 labgard nv-629-600 126965111008 43092 1b21 labgard nv-629-600 126971111008 43090 1b22 labgard nv-629-600 126967111008 43093 1b22 nuaire nv-612-spec 80565103002 45023 1b23 nuaire nv-602-400 11674091301 40299 1b22 labonco 36209-04 990906254 28319 1b25 germfree lfgi-6usp 65-15-lug-16441 pharmacy-67087 2c-125 Cancer Center germfree lfgi-6usp 65-15-lug-1644o pharmacy-67088 2c-125 Cancer Center baker Company egb-6252 67642 pharmacy-40255 1c-27 Main baker Company egb-6252 67643 pharmacy-40168 1c-27 Main germfree lfgi-6usp 6s-15-lgu-13405 pharmacy-41505 4c-31 Main germfree lfgi-4usp 4s-15-lgu-13340 pharmacy-41506 4c-31 Main hazardous- bbf-3ssrx 3s-15-br-16215 pharmacy-trailer iv-trailer hazardous- bbf-3ssrx 3s-15-br-16216 pharmacy-trailer iv-trailer non-hazardous bvbi-3ssrx 3s-15-bvbi-16217 pharmacy-trailer iv-trailer non-hazardous bvbi-3ssrx 3s-15-bvbi-16218 pharmacy-trailer iv-trailer contractor Shall Perform The Following Testing: bi-annual down Flow Velocity inflow Velocity airflow Smoke Pattern Test hepa Filter Leakage static Pressure Reading (unit & Duct) site Assessment environmental Conditions For Temperature, Humidity, And Pressure smoke Test Pattern. airborne Non-viable Particle Counting Monthly viable Particle Surface And Air Sampling And Analysis For Medium Risk Facilities contractor Shall Provide A Field Service Report (fsr) Via Email To The Contracting Officer Representative (cor Within Ten (10) Days Of Completed Service. Contractor Shall Provide The Fallowing Information: type Of Equipment (i.e. Fume Hood) manufacture model Number class (i.e. Aii) serial Number va Equipment Entry (ee) Number building And Room The Equipment Is Located In. test Date. pass Or Fail date Of Next Inspection the Contractor Shall Revalidate The Data If Any Equipment Is Added Or Removed. the Contractor Shall Affix Label To Each Unit That Passes Certification. The Contractor Shall Affix Labels On The Day The Inspection Was Passed Or The Certification Date. The Contractor Shall Provide Label That Includes: company Name mailing Address telephone Number. certificate Name ( Certificate Of Environmental Compliance To Cal Or Osha And Nfs Standard No.49 ) equipment Manufacture equipment Name inspection Date date Of Next Inspection signature Of Inspector full Printed Name Of Inspector status: Certified unit Id Number From Contract the Contractor Shall Affix Label To Each Unit That Fails Certification. The Contractor Shall Affix Labels On The Day Od The Failed Inspection Or Certification. The Contractor Shall Provide Label That Includes: company Name mailing Address telephone Number. equipment Manufacture equipment Name inspection Date signature Of Inspector full Printed Name Of Inspector status: Failed unit Id Number From Contract contractor Shall Submit A Written Statement Of Repairs Needed (to Be Referred To As Failed Inspection Report), Including An Itemized Listing Of Parts Deemed Necessary To Certify The Unit. This Must Be Submitted To The Cor Prior To Leaving The Facility On The Day Of Attempted Certification. This Information Must Be Written In Detail So That The Cor May Pass It To A Repair Contractor (if Selected To Be Different From The Certification Contractor) Thus Enabling This Other Contractor To Bring All Materials And Parts Needed At The Time Of Service To Effect Repairs Rendering The Unit Certifiable. if A Hood Is Deemed Non-repairable, Not Meeting Industry Standards, And Failing The Test Requirements, The Contractor Shall Provide The Cor With The Failed Inspection Report Outlining Specific Non-repairable/replaceable Parts That Prevents Certification On The Same Day Of The Inspection. The Contractor Shall Notify The Cor Verbally And Through A Written Report Of Any Equipment Not Being Repaired To The Cor Prior To Leaving The Government Premises. emergency Line Item - Over And Above Repairs. over And Above Repairs - For The Emergency Services, Repairs And Maintenance That Are Over And Above The Sow, If Quote Pricing Is Within The Cor S Government Purchase Card (gpc) Threshold, The Cor Will Authorize Payment. For Emergencies Over The Cor S Gpc Threshold, Only The Contracting Officer (co) Is Authorized To Approve Contract Modifications. Additional Services Shall Be Approved By The Contracting Officer Prior To The Contractor Initiating Any Work. The Contractor Shall Provide An On Schedule- Quote To Both The Co And Cor For Review And Consideration. Additional Funding Will Be Provided By The Facility As Needed For Payment. training the Contractor Personnel Performing Inspection And Certification Services Shall Be Fully Accredited And Certified To Conduct Test, Evaluations And Certification Of The Equipment Assigned. the Contractor Personnel Shall Have Validated Certification Of Accreditation From National Sanitation Foundation (nsf) International: Biohazard Cabinet Field Certifier Accreditation Program. The Certificate Of Accreditation Shall Specify The Initial And Expiration Dates And This Certification Shall Be Verifiable On The Nsf Website And Shall Be Provided To The Cor Ten (10) Days Fallowing Award. the Contractor Shall Be Required To Update Accredited Contractor Personnel Certifications Throughout The Life Of The Contract As Changes Occur To Staff. New Employee Credentials Of Accreditation For Equipment On Contract And Training Certificates Must Be Submitted And Approved By The Cor Prior To The Employee Commencing Any Work On This Contract. inspections the Contractor Shall Perform Inspections Bi-annually. Inspections, Certifications, And Testing Are To Be Completed Within The First Fifteen (15) Working Days Of Each Scheduled Service. inspections Shall Be Mutually Agreed Upon By The Cor And Contractor Thirty (30) Days Prior To The Inspection. the Contractor Is Responsible For Complying With The Inspection Schedules. period Of Performance: 30 Days From Performance Start Date. Work May Be Scheduled During The Day Or Night (depending On Load Demand), Monday Thru Friday And/or Saturday Thru Sunday. daytime Hours: 6 Am To 4 Pm evening Hours: 4 Pm To 4 Am contractor Shall Initiate Work Within 2 Weeks Of Being Contacted By The Designated Contracting Officer S Point Of Contact (poc) Or Designee. Work Shall Be Scheduled Through The Poc Or Designee, Who Will Coordinate With Vallhcs Staff. Timelines Are Subject To Change Due To Vallhcs Operational Requirements. place Of Performance: Main Hospital Va Loma Linda 11201 Benton St. Loma Linda, Ca 92357 licensing Requirements: offeror Must Possess A 30-hour Occupational Safety And Health Administration (osha) Safety Card. ansi Certification Of Accreditation iso/iec 17025:2017 Calibration And Testing specific Requirements: contractor Shall Schedule Start Date With Poc Or Designee Five (5) Business Days In Advance. the Contractor Shall Provide Bi-annual Or Monthly Inspection, Certifications, And Testing On The Equipment Listed. contactor Personnel Shall Have Valid Loma Linda Piv Badges Before Starting Work. contractor Shall Coordinate Energy Source Lock Out /tag Out Procedures With Vallhcs Hvac Supervisor Before Starting Work. When Work Is Complete, Contractor Shall Notify The Vallhcs Hvac Supervisor That Energy Sources Will Be Restored And Require Verification. contractor S Supervisor Or Lead Technician Are To Check In With Vallhcs Hvac Supervisor, Or In Their Absence, With Graphics Control Prior To Work Each Day. contractor Shall Conform To The Following Standards, Policies, Regulations, Governing Agency, And Any Other Local, State, Or Federal Guidelines That Are Not Listed Here. osha 29cfr Regulations, Www.osha.gov nfpa 99, Www.nfpa.org california Administration Code. Title 8 nsf/ansi 49 cdc/nih Biosafety In Microbiological And Biomedical Laboratories,4th Ed, May 1999 nih Guidelines For Research Involving Recombinant Dna Molecules, January 2001 american Society Of Hospital Pharmacists Technical Bulletin On Handling Cytotoxic Drug In Hospital food And Drug Administration joint Commission cal/osha 5154 international Organization For Standardization (iso0 Class5,7, And 8 Criteria) iso 17025 And 14644 cag-003 And Cag-009 iest-rp-cc002 united States Pharmacopeias (usp) 797, (usp) 800 And 116 authorized Services: only Those Services Specified Herein Are Authorized Under This Contract. Before Permitting And/or Performing Any Service Of A Non-contract Nature, The Contractor Shall Advise The Co Of The Reason (s) For The Additional Work And/or Service. The Contractor Is Cautioned That Only The Co Or His/her Designee May Authorize Additional Service That Are Within The Scope Of This Contract And That Reimbursement Shall Not Be Made Unless Prior Authorization Is Obtained From The Co. All Changes To The Contract Shall Be Issued Through A Contract Modification In Writing From The Co To The Contractor. delegation Of Authority: no Additional Service Shall Be Provided Without The Approval From The Contracting Officer (co) Or His/her Designee Of This Contract. The Contractor Shall Not Accept Any Instructions Issued By Any Other Person(s) Other Than The Co Or His/her Delegated Representative Acting Within The Limits Of His/her Authority. government-furnished Equipment (gfe) Government Furnished Information (gfi): No Government Equipment Will Be Used By The Vendor. recognized Holidays: the Following Is A List Of All Government Recognized Holidays: in Accordance With 5 U.s.c. 6103, Executive Order 11582 And Public Law 94-97 The Following National Holidays Are Observed And For The Purpose Of This Contract Are Defined As Legal Federal Official Holidays : new Year S Day: January 1 martin Luther King S Birthday: Third Monday In January president S Day: Third Monday In February memorial Day: Last Monday In May juneteenth Independence Day: June 19 independence Day: July 4 labor Day: First Monday In September columbus Day: Second Monday In October veterans Day: November 11 thanksgiving Day: Fourth Thursday In November christmas Day: December 25 If A Holiday Falls On Sunday, The Following Monday Shall Be Observed As The Legal Holiday. When A Holiday Falls On A Saturday, The Preceding Friday Is Observed As A Legal Holiday By U.s. Government Agencies. Also Included, Would Be Any Other Day Specifically Declared By The President Of The United States Of America To Be A National Holiday. contractor Employees And Badges: Contractor Personnel Shall Present A Neat Appearance And Be Easily Recognized As Contractor Employees. Examples: Wearing Of Distinctive Clothing Such As Uniform, Badges, Patches, Etc. all Contractor Personnel Shall Be Required To Wear Va Always Provided Identification (i.d.) Badges Above The Waist While On The Va Grounds. Contractor Shall Be Required To Coordinate With The Cor To Obtain The Va Provided I.d. Badges For All Staff. All Va Provided I.d. Badges Shall Be Returned At The End Of The Contract Or Upon Completion Of Service. Failure To Wear Id Badges May Result In Removal From Any Of The Va Facilities And/or Otherwise Referred To Government Property. safety And Ppe Equipment: Personal Protective Equipment Shall Be Provided For Each Contractor Employee By The Contractor. Possession Of Weapons Are Prohibited. smoking And Vaping Policies: Smoking And Vaping Are Prohibited On Government Property. parking: it Is The Responsibility Of Contractor Personnel To Park Only In Designated Parking Areas. Parking Information Is Available From The Va Security Service. The Va Shall Not Invalidate Or Make Reimbursement For Parking Violations Of The Contractor's Personnel Under Any Circumstances. complaints: contractor Shall Promptly And Courteously Respond To Complaints Within Three (3) Working Days To The Cor. Including Complaints Brought To The Contractor S Attention By The Co. Contractor Shall Maintain A Written Record Of All Complaints, Both Written And Oral Showing The Identity Of The Individual, The Nature Of The Complaint, And Contractor S Response. Contractor Shall Permit The Government To Inspect The Written Records Of Complaints Upon Reasonable Notice From The Co. required Submittals With Quotes Shall Include Following: proof Of: offeror Must Possess A 30-hour Occupational Safety And Health Administration (osha) Safety Card. ansi Certification Of Accreditation iso/iec 17025:2017 Calibration And Testing the Contract Period Of Performance Is 2-5-2025 1-31-2030, With An Fop Of Destination. place Of Performance/place Of Delivery: va Loma Linda Healthcare System 11201 Benton St loma Linda, Ca 92357 the Full Text Of Far Provisions Or Clauses May Be Accessed Electronically At Http://acquisition.gov/comp/far/index.html. the Following Solicitation Provisions Apply To This Acquisition: far 52.212-1, Instructions To Offerors Commercial Products And Commercial Services far 52.212-3, Offerors Representations And Certifications Commercial Products And Commercial Services offerors Must Complete Annual Representations And Certifications Electronically Via The System For Award Management (sam) Website Located At Https://www.sam.gov/portal In Accordance With Far 52.212-3, Offerors Representations And Certifications Commercial Products And Commercial Services. If Paragraph (j) Of The Provision Is Applicable, A Written Submission Is Required. the Following Contract Clauses Apply To This Acquisition: far 52.212-4, Contract Terms And Conditions Commercial Products And Commercial Services (dec 2022). addendum To Far 52.212-4, Contract Terms And Conditions-commercial Products And Commercial Services Applies To And Is Included With This Acquisition. far 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders Commercial Products And Commercial Services (sep 2023). the Following Subparagraphs Of Far 52.212-5 Are Applicable: (b)(4), (5), (9), (11), (12), (18), (26), (31), (33), (34), (35), (36), (37), (39), (40), (55), (63), (c)(1), (2), (7), (8). all Invoices From The Contractor Shall Be Submitted Electronically In Accordance With Vaar Clause 852.232-72 Electronic Submission Of Payment Requests. This Is Accomplished Through The Tungsten Network Located At: Http://www.fsc.va.gov/einvoice.asp. This Is Mandatory And The Sole Method For Submitting Invoices. all Quoters Shall Submit The Following: All Information Required By Far 52.212-1(b) Submission Of Offers. all Quotes Shall Be Sent To The Network Contracting Office (nco): Koby.thiel@va.gov. award Will Be Based Upon A Comparative Evaluation Of Quotes In Accordance With The Simplified Acquisition Procedures Of Far 13. Comparative Evaluation Is The Side By Side Pairwise Comparison Of Quotes Based On Factors Resulting In A Contracting Officer Decision For The Quote Most Favorable To The Government. the Following Are The Decision Factors: Price, And Past Performance, With Price More Important. past Performance Will Be Based On Cpars And Fapiis Ratings. No Rating In Cpars Is Equal To A Neutral Rating. the Award Will Be Made To The Response Most Advantageous To The Government. responses Should Contain Your Best Terms, Conditions. to Facilitate The Award Process, All Quotes Must Include A Statement Regarding The Terms And Conditions Herein As Follows: "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document Without Modification, Deletion, Or Addition." or "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document With The Exception, Deletion, Or Addition Of The Following:" quoters Shall List Exception(s) And Rationale For The Exception(s), If Any. questions Shall Be Received Not Later Than 01-29-2025, 8:00 Am Mst At Koby.thiel@va.gov Only. Subject Line Should Include Response To Rfq 36c26225q0366. final Submission Of Your Response Shall Be Received Not Later Than 02-03-2025, 8:00 Am Mst At Koby.thiel@va.gov Only. Subject Line Should Include Response To Rfq 36c26225q0366. submissions Shall Include Your Quote As Well As A Capabilities Statement With Qualifications Proving All Certifications And Education Required For The Work Being Conducted In The Sow. Submissions Not Meeting All Requirements Of The Sow Will Be Considered Ineligible For Award. late Submissions Shall Be Treated In Accordance With The Solicitation Provision At Far 52.212-1(f). all Quotes Regarding This Solicitation Should Be Forwarded In Writing Via E-mail To The Point Of Contact Listed Below. koby.thiel@va.gov
Closing Date3 Feb 2025
Tender AmountRefer Documents 

Municipality Of Irosin, Sorsogon Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Republic Of The Philippines Province Of Sorsogon Municipality Of Irosin Bids & Awards Committee Invitation To Bid For Facility Enhancement/repair & Maintenance(super Health Center) 1. The Local Government Unit Of Irosin, Through The Trust Fund(philhealth) Intends To Apply The Sum Of Seven Hundred Fourteen Thousand Seven Hundred Three Pesos (p 714,703.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Facility Enhancement/repair & Maintenance(super Health Center), Infr-01-2025. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Name Of Contract : Facility Enhancement/repair & Maintenance(super Health Center) Brief Description: Chb Laying And Plastering/fabrication/installation Of Forms & Rsb And Tile Setting For Lavatories And Counters/installation Of Plumbing And Electrical Fixtures Approved Budget For The Contract : P 714,703.00 Source Of Fund : Trust Fund(philhealth) 2. The Local Government Unit Of Irosin Now Invites Bids For The Above Procurement Project. Completion Of Works Is Sixty (60) Calendar Days. Bidders Should Have Completed At Least One Similar Project For The Last Five(5) Years And Whose Value, Of The Contract, Adjusted To Current Prices Using The Nso Consumer Price Indices Must Be Equal To 50% Of The Abc To Be Bid. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From Local Government Unit Of Irosin And Inspect The Bidding Documents At The Address Given Below From 8:00 Am-5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 9, 2025 Until January 31, 2025 From The Given Address And Philgeps Website And Lgu-irosin Website And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of One Thousand Pesos (p 1,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Presenting In Person The Official Receipt Of Bid Documents To The Bac Office. 6. The Local Government Unit Of Irosin Will Hold A Pre-bid Conference On January 16, 2025, 9:00am At The Conference Room, Office Of The Municipal Mayor, Municipal Compound, San Julian, Irosin, Sorsogon, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before January 31, 2025, 8:59 Am At Bac Office, Municipal Compound, San Julian, Irosin, Sorsogon. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On January 31, 2025, 9:00 Am At The Given Address Below Conference Room, Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 10. The Local Government Unit Of Irosin Reserves The Right To Accept Any And All Bids, Declare A Failure Of Bidding Or Not Award A Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations(irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11.for Further Information, Please Refer To: Benjamin M. Gabionza, Ce Municipal Engineer Municipal Compound, San Julian, Irosin, Sorsogon Url: Www.irosin.gov.ph Email Address: Bengabionza@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps Website And Www.irosin.gov.ph Date Of Posting: January 9, 2025 _____________________ Noel D. Mercado Ii Bac Chairman Standard Form Number: Sf-infr-07 Revised On: July 29, 2004 Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ A) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Or B) Registration From Sec, Department Of Trade And Industry(dti) For Sole Proprietorship And Cda For Cooperatives C) Valid Mayor’s Permit By The City Or Municipality Where The Principal Place Of Business Is Located D) Tax Clearance Per Eo 398 E) Tax Clearance For Collection Purposes Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid Completed Within The Last Five(5) Years, Except Under Conditions Provided Under The Rules; And • The Statement Shall Include The Following: (1)name Of The Contract; (2)date Of The Contract; (3)contract Duration; (4)owner’s Name And Address; (5)nature Of Work; (6)contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation; (7)total Contract Value At Award; (8)date Of Completion Or Estimated Completion Time; (9)total Contract Value At Completion, If Applicable; (10)percentages Of Planned And Actual Accomplishments, If Applicable; (11)value Of Outstanding Works, If Applicable; (12)the Statement Shall Be Supported By The Notices Of Award And/or Notices To Proceed Issued By The Owners; And (13)the Statement Shall Be Supported By The Constructors Performance Evaluation System (cpes) Rating Sheets, And/or Certificates Of Completion And Owner’s Acceptance, If Applicable; ⬜ (d) Valid Pcab License-category B, Size Range Medium A Or Higher/special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. (h) Affidavit Of Site Inspection Financial Documents ⬜ (i) Audited Financial Statement Stamped Received By The Bureau Of Internal Revenue(bir) Or Its Duly Authorized Institutions, For The Immediately Preceding Calendar Year, Which Should Not Be Earlier From Two(2) Years From The Date Of Submission (j) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (k) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (l) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (m) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (n) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (o) Cash Flow By Quarter. Instruction To Bidders 1. Scope Of Bid The Procuring Entity, Local Government Unit Of Irosin Invites Bids For The Facility Enhancement/repair & Maintenance(super Health Center), With Project Identification Number Infr-01-2025. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project (referred To Herein As “project”) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For Trust Fund (philhealth) In The Amount Of Seven Hundred Fourteen Thousand Seven Hundred Three Pesos ( P 714,703.00). 2.2. The Source Of Funding Is: Trust Fund(philhealth) 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. Subcontracting Is Not Allowed During The Bidding. 7.2. Subcontracting Is Not Allowed During The Contract Implementation Stage. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On January 16, 2025, 9:00am And Either At Its Physical Address Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon In A Face-to-face Manner As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Special Pcab License In Case Of Joint Ventures, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: Philippine Pesos 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty(120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Facility Enhancement/repair & Maintenance(super Health Center) I.formworks Ii. Concrete And Masonry And Tile Works Iii. Plumbing Works Iv. Electrical Works V. Painting Works Vi. Doors And Windows Spl-1 Ppe’s Spl-2 Project Signage 7.1 Not Applicable Since Sub-contracting Is Not Allowed. 10.3 The Other Contractor’s License Or Permit Required Is Bir Registration. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Facility Enhancement/repair & Maintenance(super Health Center) Key Personnel General Experience Relevant Experience 1. Foreman 2. Skilled Worker 3.laborer 10.5 Facility Enhancement/repair & Maintenance(super Health Center) The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units 1.enough Hand Tools 12 Value Engineering Clause Is Not Allowed. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. [two Percent (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. [five Percent (5%) Of Abc] If Bid Security Is In Surety Bond. 19.2 Partial Bids Are Not Allowed. 20 Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It: Bir Registration 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And Other Acceptable Tools Of Project Scheduling. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Rehabilitation/improvement Of Brgy. Cawayan Level Ii Water System Gcc Clause 2 Sectional Completion Is Not Applicable Since All Works Must Be Completed Within 60 Calendar Days. 4.1 The Schedule Of Delivery Of The Possession Of The Site To The Contractor, Whether Full Or In Part Is Seven(7) Calendar Days After The Issuance Of The Notice To Proceed(ntp). 6 The Site Investigation Reports Are: Completion Of Existing Constructed Building. 7.2 In Case Of Permanent Structures, Such As Buildings Of Types 4 And 5 As Classified Under The National Building Code Of The Philippines And Other Structures Made Of Steel, Iron, Or Concrete Which Comply With Relevant Structural Codes (e.g., Dpwh Standard Specifications), Such As, But Not Limited To, Steel/concrete Bridges, Flyovers, Aircraft Movement Areas, Ports, Dams, Tunnels, Filtration And Treatment Plants, Sewerage Systems, Power Plants, Transmission And Communication Towers, Railway System, And Other Similar Permanent Structures: Fifteen (15) Years. In Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures: Five (5) Years. In Case Of Other Structures, Such As Bailey And Wooden Bridges, Shallow Wells, Spring Developments, And Other Similar Structures: Two (2) Years. 10 A. Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Not Applicable Days Of Delivery Of The Notice Of Award. Not Applicable Since The End-user, Municipal Engineering Office, Was The One Who Made The Program Of Work(pow). 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is Not Applicable. Reason Was Stated In 11.1. 13 The Amount Of The Advance Payment Shall Not Exceed 15% Of The Total Contract Price And Schedule Of Payment. 14 15.1 The Date By Which Operating And Maintenance Manuals Are Required Is 120 Calendar Days After The Commencement Of Works. The Date By Which “as Built” Drawings Are Required Is 60 Calendar Days After The Commencement Of Works. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Not Applicable. Section Vi. Specifications Specifications Is Provided In The Program Of Work(pow) And Detailed Estimates Section Vii. Drawings Please Seek The Drawings At The Office Of The Municipal Engineer Of Local Government Unit Of Irosin. Section Viii. Bill Of Quantities Rehabilitation/improvement Of Brgy. Cawayan Level Ii Water System Item No. Scope Of Work Quantity Unit 1.direct Cost(dc) I Formworks Ii Concrete And Masonry And Tile Works Iii Plumbing Works Iv Electrical Works V Painting Works Vi Doors And Windows Spl-1 Ppe’s Spl-2 Project Signage 2 Indirect Cost(ic), Contractor’s Mark-up 2.1 Contractor’s Profit(10% Of Direct Cost) 2.2 Ocm(15% Of Direct Cost) 2.3 Vat Component (5% Of Contractor’s Profit+dc+ocm) 2.4 Mobilization 2.5 Utilities(professional Fee’s For Electrical Engineers) Total Cost Of All Line Item Includes Cost Of Contractor’s Profit, Taxes And Ocm. Attached Detailed Cost Estimates Section Ix. Bidding Forms Table Of Contents Bid Form Form Of Contract Agreement Omnibus Sworn Statement Affidavit Of Site Inspection Bid Securing Declaration Bid Form Date: Project Id No.: Infr-01-2025 To: [name And Address Of Procuring Entity] Having Examine The Philippine Bidding Documents(pbds) Including The Supplemental Or Bid Bulletin Numbers ______, The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Declare That: (a) We Have Reservation To The Pbds, Including The Supplemental Or Bid Bulletins, For The Procurement Projects, Facility Enhancement/repair & Maintenance(super Health Center); (b) We Offer To Execute The Works For This Contract In Accordance With The Pbds; (c) The Total Price Of Our Bid In Words And Figures , Excluding Any Discounts Offered Below Is (insert Information); (d) The Discounts Offered And The Methodology For Their Application Are: [insert Information) (e) The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: Value Added Tax, Income Tax, Local Taxes And Other Fiscal Levies And Duties Which Are Itemized Herein And Reflected In The Detailed Estimates; (f) Our Bid Shall Be Valid Within A Period Stated In The Pbds, And It Shall Remain Binding Upon Us At Any Time Before The Expiration Of That Period; (g) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract, Or A Performance Securing Declaration In Lieu Of The Allowable Forms Of The Performance Security, Subject To The Terms And Conditions Of Issued Gppb Guidelines For This Purpose; (h) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (i) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (j) We Understand That You Are Not Bound To Accept The Lowest Evaluated Bid Or Any Other Bid That You May Receive. (k) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Facility Enhancement/repair & Maintenance(super Health Center). (l) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be Ground For The Rejection Of Our Bid. Name: Legal Capacity: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Contract Agreement For The Procurement Of Infrastructure Projects(revised) __________________________________________________________________________ This Agreement, Made This [insert Date] Day Of [insert Month], [insert Year] Between [name And Address Of Procuring Entity] (hereinafter Called The“entity”) And [name And Address Of Contractor] (hereinafter Called The “contractor”). Whereas, The Entity Is Desirous That The Contractor Execute [name And Identification Number Of Contract] (hereinafter Called “the Works”) And The Entity Has Accepted The Bid For [insert The Amount In Specified Currency In Numbers And Words] By The Contractor For The Execution And Completion Of Such Works And The Remedying Of Any Defects Therein. Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents As Required By The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 Shall Be Deemed To Form And Be Read And Construed As Part Of This Agreement, Viz.: A. Philippine Bidding Documents(pbds) I.drawings/plans; Ii.specifications; Iii.bill Of Quantities Iv.general And Special Conditions Of Contract; V.supplemental Or Bid Bulletins B. Winning Bidder’s Bid, Including The Eligibility Requirements, Technical And Financial Proposals, And All Other Documents Or Statements Submitted; Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes, And All Other Documents Submitted(e.g., Bidder’s Response To Request For Clarifications On The Bid), Including Corrections To The Bid, If Any, Resulting From The Procuring Entity’s Bid Evaluation; C. Performance Security D. Notice Of Award Of Contract And The Bidder’s Conforme Thereto; And E. Other Contract Documents That May Be Required By Existing Laws And/or The Procuring Entity Concerned In The Pbds. Winning Bidder Agrees That Additional Contract Documents Or Information Prescribed By The Gppb That Are Subsequently Required For Submission After The Contract Execution, Such As The Notice To Proceed, Variation Orders And Warranty Security, Shall Likewise Form Part Of The Contract. 3. In Consideration For The Sum Of [total Contract Price In Words And Figures) Or Such Other Sums As May Be Ascertained, [name Of Bidder] Agrees To Execute The Works For The [state The Object Of The Contract] In Accordance With His/her/its Bid. 4. The [name Of The Procuring Entity] To Pay The Above-mentioned Sum In Accordance With The Terms Of Bidding. In Witness, Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Binding Signature Of The Procuring Entity: Binding Signature Of Contractor: Insert Name And Signature] [insert Name And Signature] [insert Signatory’s Legal Capacity] [insert Signatory’s Legal Capacity] Signed In The Presence Of: ______________________ ________________ Municipal Engineer Liaison Officer For: For: [insert Procuring Entity] [insert Name Of Supplier] Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Contract Agreement And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. This Instrument Consists Of ____ Pages Including This Page On Which The Acknowledgement Is Written Duly Signed By The Contracting Parties And Their Witnesses. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Omnibus Sworn Statement(revised) Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g. Duly Notarized Secretary’s Certificate, Board/partnership Resolution Or Special Power Of Attorney, Whichever Is Applicable]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For And In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay, Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Of Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling(estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 Series Of 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This ___________ Day Of __________________, 2025 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Infr-01-2025 Facility Enhancement/repair And Maintenance (super Health Center) Irosin, Sorsogon Standard Form Number: Sf-infr-51 Revised On: August 11, 2004 Affidavit Of Site Inspection I, ________________________, Of Legal Age, _____________, Filipino And Residing At __________________________, Under Oath, Hereby Depose And Say: 1. That I Am The _________________________ Of The ____________________________________________, With Office Address At ______________________________; 2. That I Have Inspected The Site For Facility Enhancement/repair And Maintenance(super Health Center); 3. That I Am Making This Statement As Part Of The Requirement For The Technical Proposal Of The _________________________ Of ___________________________. In Faith Whereof, I Hereby Affix My Signature This ______ Day Of ________, 2025 At _________________________, Philippines. ___________________ Affiant Subscribed And Sworn To Before Me This ____ Day Of _________ 2025, Affiant Exhibiting To Me His/her Community Tax Certificate No. _______________ Issued On ________________ At ______________________________, Philippines. _______________________ Notary Public Until ______________ Ptr No. ______________ Date ______________ Place ______________ Tin ______________ Doc No. __________ Page No. _________ Book No. _________ Series Of _________. Republic Of The Philipppines ) City Of Sorsogon ) S.s. X ---------------------------------------------------x Bid Securing Declaration Project Identification No. Infr-01-2025 To: [insert Name And Address Of Procuring Entity] I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two(2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen(15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1(f) Of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid-securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am Declared Ineligible Or Post Disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And (c) I Am/we Declared As The Bidder With The Lowest Calculated And Responsive Bid And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I Have Hereunto Set My Hand This _____ Day Of ________, 2025 At __________________. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. __________ Page No. __________ Book No. __________ Series Of 2025.
Closing Date31 Jan 2025
Tender AmountPHP 714.7 K (USD 12.1 K)

Municipality Of Irosin, Sorsogon Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Republic Of The Philippines Province Of Sorsogon Municipality Of Irosin Bids & Awards Committee Invitation To Bid For Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon 1. The Local Government Unit Of Irosin, Through The Lgsf-fabdp(ntf-elcac-fy 2024) Intends To Apply The Sum Of Five Million Pesos (p 5,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Construction Of Municipal Building Brgy. Cawayan, Irosin, Sorsogon, Infr-03-2025. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Name Of Contract : Construction Of Municipal Building Brgy. Cawayan, Irosin, Sorsogon Brief Description: Construction Of 1 Unit,2-classroom School Building With A Total Of 162.00 Sq.m. Floor Area With Amenities And Grouted Rip-rap/slope Protection Approved Budget For The Contract : P 5,000,000.00 Source Of Fund : Lsgf_fabdp(ntf-elcac-fy 2024) 2. The Local Government Unit Of Irosin Now Invites Bids For The Above Procurement Project. Completion Of Works Is Two Hundred Ten (210) Calendar Days. Bidders Should Have Completed At Least One Similar Project For The Last Five(5) Years And Whose Value, Of The Contract, Adjusted To Current Prices Using The Nso Consumer Price Indices Must Be Equal To 50% Of The Abc To Be Bid. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From Local Government Unit Of Irosin And Inspect The Bidding Documents At The Address Given Below From 8:00 Am-5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 17, 2025 Until February 10, 2025 From The Given Address And Philgeps Website And Lgu-irosin Website And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (p 5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Presenting In Person The Official Receipt Of Bid Documents To The Bac Office. 6. The Local Government Unit Of Irosin Will Hold A Pre-bid Conference On January 24, 2025, 9:00am At The Conference Room, Office Of The Municipal Mayor, Municipal Compound, San Julian, Irosin, Sorsogon, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before February 10, 2025, 8:59 Am At Bac Office, Municipal Compound, San Julian, Irosin, Sorsogon. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On February 10, 2025, 9:00 Am At The Given Address Below Conference Room, Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 10. The Local Government Unit Of Irosin Reserves The Right To Accept Any And All Bids, Declare A Failure Of Bidding Or Not Award A Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations(irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11.for Further Information, Please Refer To: Benjamin M. Gabionza, Ce Municipal Engineer Municipal Compound, San Julian, Irosin, Sorsogon Url: Www.irosin.gov.ph Email Address: Bengabionza@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps Website And Www.irosin.gov.ph Date Of Posting: January 17, 2025 _____________________ Noel D. Mercado Ii Bac Chairman Standard Form Number: Sf-infr-07 Revised On: July 29, 2004 Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ A) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Or B) Registration From Sec, Department Of Trade And Industry(dti) For Sole Proprietorship And Cda For Cooperatives C) Valid Mayor’s Permit By The City Or Municipality Where The Principal Place Of Business Is Located D) Tax Clearance Per Eo 398 E) Tax Clearance For Collection Purposes Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid Completed Within The Last Five(5) Years, Except Under Conditions Provided Under The Rules; And • The Statement Shall Include The Following: (1)name Of The Contract; (2)date Of The Contract; (3)contract Duration; (4)owner’s Name And Address; (5)nature Of Work; (6)contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation; (7)total Contract Value At Award; (8)date Of Completion Or Estimated Completion Time; (9)total Contract Value At Completion, If Applicable; (10)percentages Of Planned And Actual Accomplishments, If Applicable; (11)value Of Outstanding Works, If Applicable; (12)the Statement Shall Be Supported By The Notices Of Award And/or Notices To Proceed Issued By The Owners; And (13)the Statement Shall Be Supported By The Constructors Performance Evaluation System (cpes) Rating Sheets, And/or Certificates Of Completion And Owner’s Acceptance, If Applicable; ⬜ (d) Valid Pcab License-category B, Size Range Medium A Or Higher/special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. (h) Affidavit Of Site Inspection Financial Documents ⬜ (i) Audited Financial Statement Stamped Received By The Bureau Of Internal Revenue(bir) Or Its Duly Authorized Institutions, For The Immediately Preceding Calendar Year, Which Should Not Be Earlier From Two(2) Years From The Date Of Submission (j) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (k) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (l) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (m) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (n) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (o) Cash Flow By Quarter. Instruction To Bidders 1. Scope Of Bid The Procuring Entity, Local Government Unit Of Irosin Invites Bids For The Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon, With Project Identification Number Infr-03-2025. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project (referred To Herein As “project”) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For Lgsf-fabdp(ntf-elcac-fy 2024) In The Amount Of Five Million Pesos ( P 5,000,000.00). 2.2. The Source Of Funding Is: Lgsf-fabdp(ntf-elcac-fy 2024) 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. Subcontracting Is Not Allowed During The Bidding. 7.2. Subcontracting Is Not Allowed During The Contract Implementation Stage. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On January 17 , 2025, 9:00am And Either At Its Physical Address Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon In A Face-to-face Manner As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Special Pcab License In Case Of Joint Ventures, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: Philippine Pesos 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty(120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon I.earthworks Ii. Rebar Works Iii. Formworks Iv. Concrete Works V. Masonry Works Vi. Trusses & Roofing Works Vii. Ceiling Works Viii. Plumbing Works Ix. Electrical Works X. Painting Works Xi. Doors And Windows Xii. Tile Works Xiii. Steel Works Spl-1 Grouted Rip-rap/slope Protection Spl-2 Amenities Spl-3 Hauling Of Materials To Jobsite Spl-4 Ppe’s Spl-5 Temporary Facilities Spl-6 Project Signage 7.1 Not Applicable Since Sub-contracting Is Not Allowed. 10.3 The Other Contractor’s License Or Permit Required Is Bir Registration. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon Key Personnel General Experience Relevant Experience 1. Foreman 2. Le Operator 3. Skilled Worker 4.laborer 10.5 Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units 1.tampering Machine 2. Water Truck 3. Concrete Mixer 4. Bar Cutter 5. Welding Machine 6. Enough Hand Tools 12 Value Engineering Clause Is Not Allowed. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. [two Percent (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. [five Percent (5%) Of Abc] If Bid Security Is In Surety Bond. 19.2 Partial Bids Are Not Allowed. 20 Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It: Bir Registration 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And Other Acceptable Tools Of Project Scheduling. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon Gcc Clause 2 Sectional Completion Is Not Applicable Since All Works Must Be Completed Within 210 Calendar Days. 4.1 The Schedule Of Delivery Of The Possession Of The Site To The Contractor, Whether Full Or In Part Is Seven(7) Calendar Days After The Issuance Of The Notice To Proceed(ntp). 6 The Site Investigation Reports Are: Construction Of Two Classroom Building For Cawayan Elementary School. 7.2 In Case Of Permanent Structures, Such As Buildings Of Types 4 And 5 As Classified Under The National Building Code Of The Philippines And Other Structures Made Of Steel, Iron, Or Concrete Which Comply With Relevant Structural Codes (e.g., Dpwh Standard Specifications), Such As, But Not Limited To, Steel/concrete Bridges, Flyovers, Aircraft Movement Areas, Ports, Dams, Tunnels, Filtration And Treatment Plants, Sewerage Systems, Power Plants, Transmission And Communication Towers, Railway System, And Other Similar Permanent Structures: Fifteen (15) Years. In Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures: Five (5) Years. In Case Of Other Structures, Such As Bailey And Wooden Bridges, Shallow Wells, Spring Developments, And Other Similar Structures: Two (2) Years. 10 A. Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Not Applicable Days Of Delivery Of The Notice Of Award. Not Applicable Since The End-user, Municipal Engineering Office, Was The One Who Made The Program Of Work(pow). 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is Not Applicable. Reason Was Stated In 11.1. 13 The Amount Of The Advance Payment Shall Not Exceed 15% Of The Total Contract Price And Schedule Of Payment. 14 15.1 The Date By Which Operating And Maintenance Manuals Are Required Is 210 Calendar Days After The Commencement Of Works. The Date By Which “as Built” Drawings Are Required Is 210 Calendar Days After The Commencement Of Works. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Not Applicable. Section Vi. Specifications Specifications Is Provided In The Program Of Work(pow) And Detailed Estimates Section Vii. Drawings Please Seek The Drawings At The Office Of The Municipal Engineer Of Local Government Unit Of Irosin. Section Viii. Bill Of Quantities Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon Item No. Scope Of Work Quantity Unit 1.direct Cost(dc) I Earthworks 1.00 Lot Ii Rebar Works 4,789.81 Kls Iii Formworks 1.00 Lot Iv Concrete Works 53.14 Cu.m. V Masonry Works 214.96 Sq.m. Vi Trusses & Roofing Works 172.00 Sq.m. Vii Ceiling Works 166.50 Sq.m. Viii Plumbing Works 1.00 Lot Ix Electrical Works 1.00 Lot X Painting Works 1.00 Lot Xi Doors And Windows 1.00 Lot Xii Tile Works 25.64 Sq.m. Xiii Steel Works 1.00 Lot Spl-1 Grouted Rip-rap/slope Protection 61.40 Cu.m. Spl-2 Amenities 1.00 Lot Spl-3 Hauling Of Materials To Jobsite 1.00 Lot Spl-4 Ppe’s 1.00 Lot Spl-5 Temporary Facilities 1.00 Lot Spl-6 Project Signage 1.00 Lot 2 Indirect Cost(ic), Contractor’s Mark-up 2.1 Contractor’s Profit(10% Of Direct Cost) 2.2 Ocm(15% Of Direct Cost) 2.3 Vat Component (5% Of Contractor’s Profit+dc+ocm) 2.4 Mobilization Total Cost Of All Line Item Includes Cost Of Contractor’s Profit, Taxes And Ocm. Attached Detailed Cost Estimates Section Ix. Bidding Forms Table Of Contents Bid Form Form Of Contract Agreement Omnibus Sworn Statement Affidavit Of Site Inspection Bid Securing Declaration Bid Form Date: Project Id No.: Infr-03-2025 To: [name And Address Of Procuring Entity] Having Examine The Philippine Bidding Documents(pbds) Including The Supplemental Or Bid Bulletin Numbers ______, The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Declare That: (a) We Have Reservation To The Pbds, Including The Supplemental Or Bid Bulletins, For The Procurement Projects, Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon; (b) We Offer To Execute The Works For This Contract In Accordance With The Pbds; (c) The Total Price Of Our Bid In Words And Figures , Excluding Any Discounts Offered Below Is (insert Information); (d) The Discounts Offered And The Methodology For Their Application Are: [insert Information) (e) The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: Value Added Tax, Income Tax, Local Taxes And Other Fiscal Levies And Duties Which Are Itemized Herein And Reflected In The Detailed Estimates; (f) Our Bid Shall Be Valid Within A Period Stated In The Pbds, And It Shall Remain Binding Upon Us At Any Time Before The Expiration Of That Period; (g) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract, Or A Performance Securing Declaration In Lieu Of The Allowable Forms Of The Performance Security, Subject To The Terms And Conditions Of Issued Gppb Guidelines For This Purpose; (h) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (i) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (j) We Understand That You Are Not Bound To Accept The Lowest Evaluated Bid Or Any Other Bid That You May Receive. (k) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon. (l) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be Ground For The Rejection Of Our Bid. Name: Legal Capacity: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Contract Agreement For The Procurement Of Infrastructure Projects(revised) __________________________________________________________________________ This Agreement, Made This [insert Date] Day Of [insert Month], [insert Year] Between [name And Address Of Procuring Entity] (hereinafter Called The“entity”) And [name And Address Of Contractor] (hereinafter Called The “contractor”). Whereas, The Entity Is Desirous That The Contractor Execute [name And Identification Number Of Contract] (hereinafter Called “the Works”) And The Entity Has Accepted The Bid For [insert The Amount In Specified Currency In Numbers And Words] By The Contractor For The Execution And Completion Of Such Works And The Remedying Of Any Defects Therein. Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents As Required By The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 Shall Be Deemed To Form And Be Read And Construed As Part Of This Agreement, Viz.: A. Philippine Bidding Documents(pbds) I.drawings/plans; Ii.specifications; Iii.bill Of Quantities Iv.general And Special Conditions Of Contract; V.supplemental Or Bid Bulletins B. Winning Bidder’s Bid, Including The Eligibility Requirements, Technical And Financial Proposals, And All Other Documents Or Statements Submitted; Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes, And All Other Documents Submitted(e.g., Bidder’s Response To Request For Clarifications On The Bid), Including Corrections To The Bid, If Any, Resulting From The Procuring Entity’s Bid Evaluation; C. Performance Security D. Notice Of Award Of Contract And The Bidder’s Conforme Thereto; And E. Other Contract Documents That May Be Required By Existing Laws And/or The Procuring Entity Concerned In The Pbds. Winning Bidder Agrees That Additional Contract Documents Or Information Prescribed By The Gppb That Are Subsequently Required For Submission After The Contract Execution, Such As The Notice To Proceed, Variation Orders And Warranty Security, Shall Likewise Form Part Of The Contract. 3. In Consideration For The Sum Of [total Contract Price In Words And Figures) Or Such Other Sums As May Be Ascertained, [name Of Bidder] Agrees To Execute The Works For The [state The Object Of The Contract] In Accordance With His/her/its Bid. 4. The [name Of The Procuring Entity] To Pay The Above-mentioned Sum In Accordance With The Terms Of Bidding. In Witness, Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Binding Signature Of The Procuring Entity: Binding Signature Of Contractor: Insert Name And Signature] [insert Name And Signature] [insert Signatory’s Legal Capacity] [insert Signatory’s Legal Capacity] Signed In The Presence Of: ______________________ ________________ Municipal Engineer Liaison Officer For: For: [insert Procuring Entity] [insert Name Of Supplier] Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Contract Agreement And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. This Instrument Consists Of ____ Pages Including This Page On Which The Acknowledgement Is Written Duly Signed By The Contracting Parties And Their Witnesses. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Omnibus Sworn Statement(revised) Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g. Duly Notarized Secretary’s Certificate, Board/partnership Resolution Or Special Power Of Attorney, Whichever Is Applicable]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For And In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay, Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Of Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling(estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 Series Of 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This ___________ Day Of __________________, 2025 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Infr-03-2025 Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon Irosin, Sorsogon Standard Form Number: Sf-infr-51 Revised On: August 11, 2004 Affidavit Of Site Inspection I, ________________________, Of Legal Age, _____________, Filipino And Residing At __________________________, Under Oath, Hereby Depose And Say: 1. That I Am The _________________________ Of The ____________________________________________, With Office Address At ______________________________; 2. That I Have Inspected The Site For Construction Of School Building Brgy. Cawayan, Irosin, Sorsogon; 3. That I Am Making This Statement As Part Of The Requirement For The Technical Proposal Of The _________________________ Of ___________________________. In Faith Whereof, I Hereby Affix My Signature This ______ Day Of ________, 2025 At _________________________, Philippines. ___________________ Affiant Subscribed And Sworn To Before Me This ____ Day Of _________ 2025, Affiant Exhibiting To Me His/her Community Tax Certificate No. _______________ Issued On ________________ At ______________________________, Philippines. _______________________ Notary Public Until ______________ Ptr No. ______________ Date ______________ Place ______________ Tin ______________ Doc No. __________ Page No. _________ Book No. _________ Series Of _________. Republic Of The Philipppines ) City Of Sorsogon ) S.s. X ---------------------------------------------------x Bid Securing Declaration Project Identification No. Infr-03-2025 To: [insert Name And Address Of Procuring Entity] I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two(2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen(15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1(f) Of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid-securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am Declared Ineligible Or Post Disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And (c) I Am/we Declared As The Bidder With The Lowest Calculated And Responsive Bid And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I Have Hereunto Set My Hand This _____ Day Of ________, 2025 At __________________. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. __________ Page No. __________ Book No. __________ Series Of 2025.
Closing Date10 Feb 2025
Tender AmountPHP 5 Million (USD 86.1 K)

Municipality Of Irosin, Sorsogon Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Republic Of The Philippines Province Of Sorsogon Municipality Of Irosin Bids & Awards Committee Invitation To Bid For Improvement/upgrading Of Super Health Center 1. The Local Government Unit Of Irosin, Through The 20% Edf 2025 Intends To Apply The Sum Of One Million Eight Hundred Nine Thousand Eight Hundred Forty Five Pesos (p 1,809,845.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Improvement/upgrading Of Super Health Center, Infr-05-2025. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Name Of Contract : Improvement/upgrading Of Super Health Center Brief Description: Fabrication/installation Of Forms & Rsb And Concrete Pouring For Concrete Counters/tile Setting For Lavatories And Counters/acp Cladding Of Cabinets/installation Of Plumbing And Electrical Fixtures And Fabrication/installation Of Canopies Approved Budget For The Contract : P 1,809,845.00 Source Of Fund : 20% Edf 2025 2. The Local Government Unit Of Irosin Now Invites Bids For The Above Procurement Project. Completion Of Works Is Ninety (90) Calendar Days. Bidders Should Have Completed At Least One Similar Project For The Last Five(5) Years And Whose Value, Of The Contract, Adjusted To Current Prices Using The Nso Consumer Price Indices Must Be Equal To 50% Of The Abc To Be Bid. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From Local Government Unit Of Irosin And Inspect The Bidding Documents At The Address Given Below From 8:00 Am-5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 28, 2025 Until February 18, 2025 From The Given Address And Philgeps Website And Lgu-irosin Website And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (p 5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Presenting In Person The Official Receipt Of Bid Documents To The Bac Office. 6. The Local Government Unit Of Irosin Will Hold A Pre-bid Conference On February 5, 2025, 2:00pm At The Conference Room, Office Of The Municipal Mayor, Municipal Compound, San Julian, Irosin, Sorsogon, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before February 18, 2025, 1:59 Pm At Bac Office, Municipal Compound, San Julian, Irosin, Sorsogon. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On February 18, 2025, 2025, 2:00 Pm At The Given Address Below Conference Room, Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 10. The Local Government Unit Of Irosin Reserves The Right To Accept Any And All Bids, Declare A Failure Of Bidding Or Not Award A Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations(irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11.for Further Information, Please Refer To: Benjamin M. Gabionza, Ce Municipal Engineer Municipal Compound, San Julian, Irosin, Sorsogon Url: Www.irosin.gov.ph Email Address: Bengabionza@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps Website And Www.irosin.gov.ph Date Of Posting: January 28, 2025 _____________________ Noel D. Mercado Ii Bac Chairman Standard Form Number: Sf-infr-07 Revised On: July 29, 2004 Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ A) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Or B) Registration From Sec, Department Of Trade And Industry(dti) For Sole Proprietorship And Cda For Cooperatives C) Valid Mayor’s Permit By The City Or Municipality Where The Principal Place Of Business Is Located D) Tax Clearance Per Eo 398 E) Tax Clearance For Collection Purposes Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid Completed Within The Last Five(5) Years, Except Under Conditions Provided Under The Rules; And • The Statement Shall Include The Following: (1)name Of The Contract; (2)date Of The Contract; (3)contract Duration; (4)owner’s Name And Address; (5)nature Of Work; (6)contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation; (7)total Contract Value At Award; (8)date Of Completion Or Estimated Completion Time; (9)total Contract Value At Completion, If Applicable; (10)percentages Of Planned And Actual Accomplishments, If Applicable; (11)value Of Outstanding Works, If Applicable; (12)the Statement Shall Be Supported By The Notices Of Award And/or Notices To Proceed Issued By The Owners; And (13)the Statement Shall Be Supported By The Constructors Performance Evaluation System (cpes) Rating Sheets, And/or Certificates Of Completion And Owner’s Acceptance, If Applicable; ⬜ (d) Valid Pcab License-category B, Size Range Medium A Or Higher/special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. (h) Affidavit Of Site Inspection Financial Documents ⬜ (i) Audited Financial Statement Stamped Received By The Bureau Of Internal Revenue(bir) Or Its Duly Authorized Institutions, For The Immediately Preceding Calendar Year, Which Should Not Be Earlier From Two(2) Years From The Date Of Submission (j) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (k) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (l) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (m) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (n) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (o) Cash Flow By Quarter. Instruction To Bidders 1. Scope Of Bid The Procuring Entity, Local Government Unit Of Irosin Invites Bids For The Improvement/upgrading Of Super Health Center, With Project Identification Number Infr-05-2025. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project (referred To Herein As “project”) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 20% Edf 2025 In The Amount Of One Million Eight Hundred Nine Thousand Eight Hundred Forty Five Pesos (p 1,809,845.00). 2.2. The Source Of Funding Is: 20% Edf 2025 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. Subcontracting Is Not Allowed During The Bidding. 7.2. Subcontracting Is Not Allowed During The Contract Implementation Stage. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On February 18, 2025, 9:00am And Either At Its Physical Address Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon In A Face-to-face Manner As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Special Pcab License In Case Of Joint Ventures, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: Philippine Pesos 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty(120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Improvement/upgrading Of Super Health Center I.forms And Scaffolding Works Ii. Rsb Works Iii. Concrete Works Iv. Tile Works V. Ceiling Works Vi. Electrical Works Vii. Painting Works Viii. Doors And Windows Ix. Canopy Works X. Other Works Spl-1 Amenities Spl-2 Ppe’s Spl-3 Project Signage 7.1 Not Applicable Since Sub-contracting Is Not Allowed. 10.3 The Other Contractor’s License Or Permit Required Is Bir Registration. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Improvement/upgrading Of Super Health Center Key Personnel General Experience Relevant Experience 1. Foreman 2. Skilled Worker 3.laborer 10.5 Improvement/upgrading Of Super Health Center The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units 1.concrete Mixer 2. Water Truck 3.welding Machine 4. Enough Hand Tools 12 Value Engineering Clause Is Not Allowed. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. [two Percent (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. [five Percent (5%) Of Abc] If Bid Security Is In Surety Bond. 19.2 Partial Bids Are Not Allowed. 20 Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It: Bir Registration 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And Other Acceptable Tools Of Project Scheduling. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Rehabilitation/improvement Of Brgy. Cawayan Level Ii Water System Gcc Clause 2 Sectional Completion Is Not Applicable Since All Works Must Be Completed Within 90 Calendar Days. 4.1 The Schedule Of Delivery Of The Possession Of The Site To The Contractor, Whether Full Or In Part Is Seven(7) Calendar Days After The Issuance Of The Notice To Proceed(ntp). 6 The Site Investigation Reports Are: Upgrading Of Super Health Center. 7.2 In Case Of Permanent Structures, Such As Buildings Of Types 4 And 5 As Classified Under The National Building Code Of The Philippines And Other Structures Made Of Steel, Iron, Or Concrete Which Comply With Relevant Structural Codes (e.g., Dpwh Standard Specifications), Such As, But Not Limited To, Steel/concrete Bridges, Flyovers, Aircraft Movement Areas, Ports, Dams, Tunnels, Filtration And Treatment Plants, Sewerage Systems, Power Plants, Transmission And Communication Towers, Railway System, And Other Similar Permanent Structures: Fifteen (15) Years. In Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures: Five (5) Years. In Case Of Other Structures, Such As Bailey And Wooden Bridges, Shallow Wells, Spring Developments, And Other Similar Structures: Two (2) Years. 10 A. Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Not Applicable Days Of Delivery Of The Notice Of Award. Not Applicable Since The End-user, Municipal Engineering Office, Was The One Who Made The Program Of Work(pow). 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is Not Applicable. Reason Was Stated In 11.1. 13 The Amount Of The Advance Payment Shall Not Exceed 15% Of The Total Contract Price And Schedule Of Payment. 14 15.1 The Date By Which Operating And Maintenance Manuals Are Required Is 90 Calendar Days After The Commencement Of Works. The Date By Which “as Built” Drawings Are Required Is 90 Calendar Days After The Commencement Of Works. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Not Applicable. Section Vi. Specifications Specifications Is Provided In The Program Of Work(pow) And Detailed Estimates Section Vii. Drawings Please Seek The Drawings At The Office Of The Municipal Engineer Of Local Government Unit Of Irosin. Section Viii. Bill Of Quantities Improvement/upgrading Of Super Health Center Item No. Scope Of Work Quantity Unit 1.direct Cost(dc) I Forms And Scaffolding Works 1.00 Lot Ii Rsb Works 166.00 Kgs Iii Concrete Works 5.00 Cu.m. Iv Tile Works 205.00 Sq.m. V Ceiling Works 335.24 Sq.m. Vi Electrical Works 1.00 Lot Vii Painting Works 1.00 Lot Viii Doors And Windows 1.00 Lot Ix Canopy Works 1.00 Lot X Other Works 1.00 Lot Spl-1 Amenities 1.00 Lot Spl-2 Ppe’s 1.00 Lot Spl-3 Project Signage 1.00 Lot 2 Indirect Cost(ic), Contractor’s Mark-up 2.1 Contractor’s Profit(10% Of Direct Cost) 2.2 Ocm(15% Of Direct Cost) 2.3 Vat Component (5% Of Contractor’s Profit+dc+ocm) 2.4 Mobilization Total Cost Of All Line Item Includes Cost Of Contractor’s Profit, Taxes And Ocm. Attached Detailed Cost Estimates Section Ix. Bidding Forms Table Of Contents Bid Form Form Of Contract Agreement Omnibus Sworn Statement Affidavit Of Site Inspection Bid Securing Declaration Bid Form Date: Project Id No.: Infr-05-2025 To: [name And Address Of Procuring Entity] Having Examine The Philippine Bidding Documents(pbds) Including The Supplemental Or Bid Bulletin Numbers ______, The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Declare That: (a) We Have Reservation To The Pbds, Including The Supplemental Or Bid Bulletins, For The Procurement Projects, Improvement/upgrading Of Super Health Center; (b) We Offer To Execute The Works For This Contract In Accordance With The Pbds; (c) The Total Price Of Our Bid In Words And Figures , Excluding Any Discounts Offered Below Is (insert Information); (d) The Discounts Offered And The Methodology For Their Application Are: [insert Information) (e) The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: Value Added Tax, Income Tax, Local Taxes And Other Fiscal Levies And Duties Which Are Itemized Herein And Reflected In The Detailed Estimates; (f) Our Bid Shall Be Valid Within A Period Stated In The Pbds, And It Shall Remain Binding Upon Us At Any Time Before The Expiration Of That Period; (g) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract, Or A Performance Securing Declaration In Lieu Of The Allowable Forms Of The Performance Security, Subject To The Terms And Conditions Of Issued Gppb Guidelines For This Purpose; (h) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (i) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (j) We Understand That You Are Not Bound To Accept The Lowest Evaluated Bid Or Any Other Bid That You May Receive. (k) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Improvement/upgrading Of Super Health Center. (l) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be Ground For The Rejection Of Our Bid. Name: Legal Capacity: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Contract Agreement For The Procurement Of Infrastructure Projects(revised) __________________________________________________________________________ This Agreement, Made This [insert Date] Day Of [insert Month], [insert Year] Between [name And Address Of Procuring Entity] (hereinafter Called The“entity”) And [name And Address Of Contractor] (hereinafter Called The “contractor”). Whereas, The Entity Is Desirous That The Contractor Execute [name And Identification Number Of Contract] (hereinafter Called “the Works”) And The Entity Has Accepted The Bid For [insert The Amount In Specified Currency In Numbers And Words] By The Contractor For The Execution And Completion Of Such Works And The Remedying Of Any Defects Therein. Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents As Required By The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 Shall Be Deemed To Form And Be Read And Construed As Part Of This Agreement, Viz.: A. Philippine Bidding Documents(pbds) I.drawings/plans; Ii.specifications; Iii.bill Of Quantities Iv.general And Special Conditions Of Contract; V.supplemental Or Bid Bulletins B. Winning Bidder’s Bid, Including The Eligibility Requirements, Technical And Financial Proposals, And All Other Documents Or Statements Submitted; Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes, And All Other Documents Submitted(e.g., Bidder’s Response To Request For Clarifications On The Bid), Including Corrections To The Bid, If Any, Resulting From The Procuring Entity’s Bid Evaluation; C. Performance Security D. Notice Of Award Of Contract And The Bidder’s Conforme Thereto; And E. Other Contract Documents That May Be Required By Existing Laws And/or The Procuring Entity Concerned In The Pbds. Winning Bidder Agrees That Additional Contract Documents Or Information Prescribed By The Gppb That Are Subsequently Required For Submission After The Contract Execution, Such As The Notice To Proceed, Variation Orders And Warranty Security, Shall Likewise Form Part Of The Contract. 3. In Consideration For The Sum Of [total Contract Price In Words And Figures) Or Such Other Sums As May Be Ascertained, [name Of Bidder] Agrees To Execute The Works For The [state The Object Of The Contract] In Accordance With His/her/its Bid. 4. The [name Of The Procuring Entity] To Pay The Above-mentioned Sum In Accordance With The Terms Of Bidding. In Witness, Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Binding Signature Of The Procuring Entity: Binding Signature Of Contractor: Insert Name And Signature] [insert Name And Signature] [insert Signatory’s Legal Capacity] [insert Signatory’s Legal Capacity] Signed In The Presence Of: ______________________ ________________ Municipal Engineer Liaison Officer For: For: [insert Procuring Entity] [insert Name Of Supplier] Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Contract Agreement And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. This Instrument Consists Of ____ Pages Including This Page On Which The Acknowledgement Is Written Duly Signed By The Contracting Parties And Their Witnesses. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Omnibus Sworn Statement(revised) Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g. Duly Notarized Secretary’s Certificate, Board/partnership Resolution Or Special Power Of Attorney, Whichever Is Applicable]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For And In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay, Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Of Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling(estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 Series Of 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This ___________ Day Of __________________, 2025 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Infr-05-2025 Improvement/upgrading Of Super Health Center Irosin, Sorsogon Standard Form Number: Sf-infr-51 Revised On: August 11, 2004 Affidavit Of Site Inspection I, ________________________, Of Legal Age, _____________, Filipino And Residing At __________________________, Under Oath, Hereby Depose And Say: 1. That I Am The _________________________ Of The ____________________________________________, With Office Address At ______________________________; 2. That I Have Inspected The Site For Improvement/upgrading Of Super Health Center; 3. That I Am Making This Statement As Part Of The Requirement For The Technical Proposal Of The _________________________ Of ___________________________. In Faith Whereof, I Hereby Affix My Signature This ______ Day Of ________, 2025 At _________________________, Philippines. ___________________ Affiant Subscribed And Sworn To Before Me This ____ Day Of _________ 2025, Affiant Exhibiting To Me His/her Community Tax Certificate No. _______________ Issued On ________________ At ______________________________, Philippines. _______________________ Notary Public Until ______________ Ptr No. ______________ Date ______________ Place ______________ Tin ______________ Doc No. __________ Page No. _________ Book No. _________ Series Of _________. Republic Of The Philipppines ) City Of Sorsogon ) S.s. X ---------------------------------------------------x Bid Securing Declaration Project Identification No. Infr-05-2025 To: [insert Name And Address Of Procuring Entity] I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two(2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen(15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1(f) Of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid-securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am Declared Ineligible Or Post Disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And (c) I Am/we Declared As The Bidder With The Lowest Calculated And Responsive Bid And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I Have Hereunto Set My Hand This _____ Day Of ________, 2025 At __________________. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. __________ Page No. __________ Book No. __________ Series Of 2025.
Closing Date18 Feb 2025
Tender AmountPHP 1.8 Million (USD 31.2 K)

Municipality Of Irosin, Sorsogon Tender

Civil And Construction...+1Civil Works Others
Philippines
Details: Description Republic Of The Philippines Province Of Sorsogon Municipality Of Irosin Bids & Awards Committee Invitation To Bid For Irosin Memorial Park Improvement(phase Iii) 1. The Local Government Unit Of Irosin, Through The 20% Edf 2025 Intends To Apply The Sum Of Three Million Pesos (p 3,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Irosin Memorial Park Improvement, Infr-04-2025. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Name Of Contract : Irosin Memorial Park Improvement(phase Iii) Brief Description: Excavation/backfilling/construction Of 0.15m X 460.00 Square Meters Pccp And 30.00 Linear Meters Canal/construction Of Additional Burial Apartments And Laying Of 1,400 Linear Meters Distribution Pipes Contract : P 3,000,000.00 Source Of Fund : 20% Edf 2025 2. The Local Government Unit Of Irosin Now Invites Bids For The Above Procurement Project. Completion Of Works Is Ninety (90) Calendar Days. Bidders Should Have Completed At Least One Similar Project For The Last Five(5) Years And Whose Value, Of The Contract, Adjusted To Current Prices Using The Nso Consumer Price Indices Must Be Equal To 50% Of The Abc To Be Bid. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From Local Government Unit Of Irosin And Inspect The Bidding Documents At The Address Given Below From 8:00 Am-5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 28, 2025 Until February 18, 2025 From The Given Address And Philgeps Website And Lgu-irosin Website And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (p 5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Presenting In Person The Official Receipt Of Bid Documents To The Bac Office. 6. The Local Government Unit Of Irosin Will Hold A Pre-bid Conference On February 5, 2025, 9:00am At The Conference Room, Office Of The Municipal Mayor, Municipal Compound, San Julian, Irosin, Sorsogon, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before February 18, 2025, 8:59 Am At Bac Office, Municipal Compound, San Julian, Irosin, Sorsogon. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On February 18, 2025, 9:00 Am At The Given Address Below Conference Room, Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 10. The Local Government Unit Of Irosin Reserves The Right To Accept Any And All Bids, Declare A Failure Of Bidding Or Not Award A Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations(irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11.for Further Information, Please Refer To: Benjamin M. Gabionza, Ce Municipal Engineer Municipal Compound, San Julian, Irosin, Sorsogon Url: Www.irosin.gov.ph Email Address: Bengabionza@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps Website And Www.irosin.gov.ph Date Of Posting: January 28, 2025 _____________________ Noel D. Mercado Ii Bac Chairman Standard Form Number: Sf-infr-07 Revised On: July 29, 2004 Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ A) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Or B) Registration From Sec, Department Of Trade And Industry(dti) For Sole Proprietorship And Cda For Cooperatives C) Valid Mayor’s Permit By The City Or Municipality Where The Principal Place Of Business Is Located D) Tax Clearance Per Eo 398 E) Tax Clearance For Collection Purposes Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid Completed Within The Last Five(5) Years, Except Under Conditions Provided Under The Rules; And • The Statement Shall Include The Following: (1)name Of The Contract; (2)date Of The Contract; (3)contract Duration; (4)owner’s Name And Address; (5)nature Of Work; (6)contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation; (7)total Contract Value At Award; (8)date Of Completion Or Estimated Completion Time; (9)total Contract Value At Completion, If Applicable; (10)percentages Of Planned And Actual Accomplishments, If Applicable; (11)value Of Outstanding Works, If Applicable; (12)the Statement Shall Be Supported By The Notices Of Award And/or Notices To Proceed Issued By The Owners; And (13)the Statement Shall Be Supported By The Constructors Performance Evaluation System (cpes) Rating Sheets, And/or Certificates Of Completion And Owner’s Acceptance, If Applicable; ⬜ (d) Valid Pcab License-category B, Size Range Medium A Or Higher/special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. (h) Affidavit Of Site Inspection Financial Documents ⬜ (i) Audited Financial Statement Stamped Received By The Bureau Of Internal Revenue(bir) Or Its Duly Authorized Institutions, For The Immediately Preceding Calendar Year, Which Should Not Be Earlier From Two(2) Years From The Date Of Submission (j) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (k) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (l) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (m) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (n) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (o) Cash Flow By Quarter. Instruction To Bidders 1. Scope Of Bid The Procuring Entity, Local Government Unit Of Irosin Invites Bids For The Improvement/upgrading Of Super Health Center, With Project Identification Number Infr-04-2025. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project (referred To Herein As “project”) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 20% Edf 2025 In The Amount Of Three Million Pesos ( P 3,000,000.00). 2.2. The Source Of Funding Is: 20% Edf 2025 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. Subcontracting Is Not Allowed During The Bidding. 7.2. Subcontracting Is Not Allowed During The Contract Implementation Stage. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On February 5, 2025, 9:00am And Either At Its Physical Address Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon In A Face-to-face Manner As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Special Pcab License In Case Of Joint Ventures, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: Philippine Pesos 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty(120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Irosin Memorial Park Improvement(phase Iii) I.excavation/backfilling Ii. Sub-grade Preparation Iii. Aggregate Base-course Iv. Portland Cement Concrete Pavement V. Line Canal Vi. Covered Line Canal W/ Box Culvert Vii. Burial Apartment Viii. Plumbing Works Spl-1 Ppe’s Spl-2 Temporary Facilities Spl-3 Project Signage 7.1 Not Applicable Since Sub-contracting Is Not Allowed. 10.3 The Other Contractor’s License Or Permit Required Is Bir Registration. 10.4 Irosin Memorial Park Improvement(phase Iii) The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel General Experience Relevant Experience 1. Foreman 2. He And Le Operator 3. Skilled Worker 4.laborer 10.5 Irosin Memorial Park Improvement(phase Iii) The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units 1.road Grader 2. Road Roller 3. Water Truck 4. Concrete Mixer 5. Concrete Cutter 6. Bar Cutter 7. Concrete Vibrator 6. Enough Handtools 12 Value Engineering Clause Is Not Allowed. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. [two Percent (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. [five Percent (5%) Of Abc] If Bid Security Is In Surety Bond. 19.2 Partial Bids Are Not Allowed. 20 Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It: Bir Registration 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And Other Acceptable Tools Of Project Scheduling. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Irosin Memorial Park Improvement Gcc Clause 2 Sectional Completion Is Not Applicable Since All Works Must Be Completed Within 90 Calendar Days. 4.1 The Schedule Of Delivery Of The Possession Of The Site To The Contractor, Whether Full Or In Part Is Seven(7) Calendar Days After The Issuance Of The Notice To Proceed(ntp). 6 The Site Investigation Reports Are: Additional Improvement Of Memorial Park. 7.2 In Case Of Permanent Structures, Such As Buildings Of Types 4 And 5 As Classified Under The National Building Code Of The Philippines And Other Structures Made Of Steel, Iron, Or Concrete Which Comply With Relevant Structural Codes (e.g., Dpwh Standard Specifications), Such As, But Not Limited To, Steel/concrete Bridges, Flyovers, Aircraft Movement Areas, Ports, Dams, Tunnels, Filtration And Treatment Plants, Sewerage Systems, Power Plants, Transmission And Communication Towers, Railway System, And Other Similar Permanent Structures: Fifteen (15) Years. In Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures: Five (5) Years. In Case Of Other Structures, Such As Bailey And Wooden Bridges, Shallow Wells, Spring Developments, And Other Similar Structures: Two (2) Years. 10 A. Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Not Applicable Days Of Delivery Of The Notice Of Award. Not Applicable Since The End-user, Municipal Engineering Office, Was The One Who Made The Program Of Work(pow). 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is Not Applicable. Reason Was Stated In 11.1. 13 The Amount Of The Advance Payment Shall Not Exceed 15% Of The Total Contract Price And Schedule Of Payment. 14 15.1 The Date By Which Operating And Maintenance Manuals Are Required Is 90 Calendar Days After The Commencement Of Works. The Date By Which “as Built” Drawings Are Required Is 90 Calendar Days After The Commencement Of Works. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Not Applicable. Section Vi. Specifications Specifications Is Provided In The Program Of Work(pow) And Detailed Estimates Section Vii. Drawings Please Seek The Drawings At The Office Of The Municipal Engineer Of Local Government Unit Of Irosin. Section Viii. Bill Of Quantities Improvement Of Irosin Memorial Park(phase Iii) Item No. Scope Of Work Quantity Unit 1.direct Cost(dc) I Excavation/backfilling 5,256.20 Cu.m. Ii Sub-grade Preparation 456.83 Sq.m. Iii Aggregate Base Course 46.00 Cu.m. Iv Portland Cement Concrete Pavement 69.00 Cu.m. V Line Canal 30.00 L.m. Vi Covered Line Canal W/ Box Culvert 18.88 L.m. Vii Burial Apartment 1.00 Lot Viii Plumbing Works 1.400.00 L.m. Spl-1 Ppe’s 1.00 Lot Spl-2 Temporary Facilities 1.00 Lot Spl-3 Project Signage 1.00 Lot 2 Indirect Cost(ic), Contractor’s Mark-up 2.1 Contractor’s Profit(10% Of Direct Cost) 2.2 Ocm(15% Of Direct Cost) 2.3 Vat Component (5% Of Contractor’s Profit+dc+ocm) 2.4 Mobilization Total Cost Of All Line Item Includes Cost Of Contractor’s Profit, Taxes And Ocm. Attached Detailed Cost Estimates Section Ix. Bidding Forms Table Of Contents Bid Form Form Of Contract Agreement Omnibus Sworn Statement Affidavit Of Site Inspection Bid Securing Declaration Bid Form Date: Project Id No.: Infr-04-2025 To: [name And Address Of Procuring Entity] Having Examine The Philippine Bidding Documents(pbds) Including The Supplemental Or Bid Bulletin Numbers ______, The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Declare That: (a) We Have Reservation To The Pbds, Including The Supplemental Or Bid Bulletins, For The Procurement Projects, Irosin Memorial Park Improvement(phase Iii); (b) We Offer To Execute The Works For This Contract In Accordance With The Pbds; (c) The Total Price Of Our Bid In Words And Figures , Excluding Any Discounts Offered Below Is (insert Information); (d) The Discounts Offered And The Methodology For Their Application Are: [insert Information) (e) The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: Value Added Tax, Income Tax, Local Taxes And Other Fiscal Levies And Duties Which Are Itemized Herein And Reflected In The Detailed Estimates; (f) Our Bid Shall Be Valid Within A Period Stated In The Pbds, And It Shall Remain Binding Upon Us At Any Time Before The Expiration Of That Period; (g) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract, Or A Performance Securing Declaration In Lieu Of The Allowable Forms Of The Performance Security, Subject To The Terms And Conditions Of Issued Gppb Guidelines For This Purpose; (h) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (i) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (j) We Understand That You Are Not Bound To Accept The Lowest Evaluated Bid Or Any Other Bid That You May Receive. (k) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Irosin Memorial Park Improvement(phase Iii). (l) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be Ground For The Rejection Of Our Bid. Name: Legal Capacity: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Contract Agreement For The Procurement Of Infrastructure Projects(revised) __________________________________________________________________________ This Agreement, Made This [insert Date] Day Of [insert Month], [insert Year] Between [name And Address Of Procuring Entity] (hereinafter Called The“entity”) And [name And Address Of Contractor] (hereinafter Called The “contractor”). Whereas, The Entity Is Desirous That The Contractor Execute [name And Identification Number Of Contract] (hereinafter Called “the Works”) And The Entity Has Accepted The Bid For [insert The Amount In Specified Currency In Numbers And Words] By The Contractor For The Execution And Completion Of Such Works And The Remedying Of Any Defects Therein. Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents As Required By The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 Shall Be Deemed To Form And Be Read And Construed As Part Of This Agreement, Viz.: A. Philippine Bidding Documents(pbds) I.drawings/plans; Ii.specifications; Iii.bill Of Quantities Iv.general And Special Conditions Of Contract; V.supplemental Or Bid Bulletins B. Winning Bidder’s Bid, Including The Eligibility Requirements, Technical And Financial Proposals, And All Other Documents Or Statements Submitted; Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes, And All Other Documents Submitted(e.g., Bidder’s Response To Request For Clarifications On The Bid), Including Corrections To The Bid, If Any, Resulting From The Procuring Entity’s Bid Evaluation; C. Performance Security D. Notice Of Award Of Contract And The Bidder’s Conforme Thereto; And E. Other Contract Documents That May Be Required By Existing Laws And/or The Procuring Entity Concerned In The Pbds. Winning Bidder Agrees That Additional Contract Documents Or Information Prescribed By The Gppb That Are Subsequently Required For Submission After The Contract Execution, Such As The Notice To Proceed, Variation Orders And Warranty Security, Shall Likewise Form Part Of The Contract. 3. In Consideration For The Sum Of [total Contract Price In Words And Figures) Or Such Other Sums As May Be Ascertained, [name Of Bidder] Agrees To Execute The Works For The [state The Object Of The Contract] In Accordance With His/her/its Bid. 4. The [name Of The Procuring Entity] To Pay The Above-mentioned Sum In Accordance With The Terms Of Bidding. In Witness, Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Binding Signature Of The Procuring Entity: Binding Signature Of Contractor: Insert Name And Signature] [insert Name And Signature] [insert Signatory’s Legal Capacity] [insert Signatory’s Legal Capacity] Signed In The Presence Of: ______________________ ________________ Municipal Engineer Liaison Officer For: For: [insert Procuring Entity] [insert Name Of Supplier] Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Contract Agreement And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. This Instrument Consists Of ____ Pages Including This Page On Which The Acknowledgement Is Written Duly Signed By The Contracting Parties And Their Witnesses. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Omnibus Sworn Statement(revised) Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g. Duly Notarized Secretary’s Certificate, Board/partnership Resolution Or Special Power Of Attorney, Whichever Is Applicable]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For And In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay, Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Of Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling(estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 Series Of 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This ___________ Day Of __________________, 2025 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Infr-04-2025 Irosin Memorial Park Improvement(phase Iii) Irosin, Sorsogon Standard Form Number: Sf-infr-51 Revised On: August 11, 2004 Affidavit Of Site Inspection I, ________________________, Of Legal Age, _____________, Filipino And Residing At __________________________, Under Oath, Hereby Depose And Say: 1. That I Am The _________________________ Of The ____________________________________________, With Office Address At ______________________________; 2. That I Have Inspected The Site For Irosin Memorial Park Improvement(phase Iii); 3. That I Am Making This Statement As Part Of The Requirement For The Technical Proposal Of The _________________________ Of ___________________________. In Faith Whereof, I Hereby Affix My Signature This ______ Day Of ________, 2025 At _________________________, Philippines. ___________________ Affiant Subscribed And Sworn To Before Me This ____ Day Of _________ 2025, Affiant Exhibiting To Me His/her Community Tax Certificate No. _______________ Issued On ________________ At ______________________________, Philippines. _______________________ Notary Public Until ______________ Ptr No. ______________ Date ______________ Place ______________ Tin ______________ Doc No. __________ Page No. _________ Book No. _________ Series Of _________. Republic Of The Philipppines ) City Of Sorsogon ) S.s. X ---------------------------------------------------x Bid Securing Declaration Project Identification No. Infr-04-2025 To: [insert Name And Address Of Procuring Entity] I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two(2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen(15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1(f) Of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid-securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am Declared Ineligible Or Post Disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And (c) I Am/we Declared As The Bidder With The Lowest Calculated And Responsive Bid And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I Have Hereunto Set My Hand This _____ Day Of ________, 2025 At __________________. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. __________ Page No. __________ Book No. __________ Series Of 2025.
Closing Date18 Feb 2025
Tender AmountPHP 3 Million (USD 51.8 K)

Municipality Of Irosin, Sorsogon Tender

Civil And Construction...+1Civil Works Others
Philippines
Details: Description Republic Of The Philippines Province Of Sorsogon Municipality Of Irosin Bids & Awards Committee Invitation To Bid For Irosin Memorial Park Improvement 1. The Local Government Unit Of Irosin, Through The 20% Edf 2024 Intends To Apply The Sum Of Two Million Forty Eight Thousand Nine Hundred Fifty Pesos (p 2,048,950.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Irosin Memorial Park Improvement, Infr-02-2025. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Name Of Contract : Irosin Memorial Park Improvement Brief Description: Clearing,excavation,backfilling And Construction Of 0.20m X 56.10 Square Meters Pccp Contract : P 2,048,950.00 Source Of Fund : 20% Edf 2024 2. The Local Government Unit Of Irosin Now Invites Bids For The Above Procurement Project. Completion Of Works Is Sixty (60) Calendar Days. Bidders Should Have Completed At Least One Similar Project For The Last Five(5) Years And Whose Value, Of The Contract, Adjusted To Current Prices Using The Nso Consumer Price Indices Must Be Equal To 50% Of The Abc To Be Bid. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From Local Government Unit Of Irosin And Inspect The Bidding Documents At The Address Given Below From 8:00 Am-5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 9, 2025 Until January 31, 2025 From The Given Address And Philgeps Website And Lgu-irosin Website And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (p 5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Presenting In Person The Official Receipt Of Bid Documents To The Bac Office. 6. The Local Government Unit Of Irosin Will Hold A Pre-bid Conference On January 16, 2025, 2:00pm At The Conference Room, Office Of The Municipal Mayor, Municipal Compound, San Julian, Irosin, Sorsogon, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before January 31, 2025, 1:59 Pm At Bac Office, Municipal Compound, San Julian, Irosin, Sorsogon. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On January 31, 2025, 2:00 Pm At The Given Address Below Conference Room, Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 10. The Local Government Unit Of Irosin Reserves The Right To Accept Any And All Bids, Declare A Failure Of Bidding Or Not Award A Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations(irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11.for Further Information, Please Refer To: Benjamin M. Gabionza, Ce Municipal Engineer Municipal Compound, San Julian, Irosin, Sorsogon Url: Www.irosin.gov.ph Email Address: Bengabionza@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps Website And Www.irosin.gov.ph Date Of Posting: January 9, 2025 _____________________ Noel D. Mercado Ii Bac Chairman Standard Form Number: Sf-infr-07 Revised On: July 29, 2004 Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ A) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Or B) Registration From Sec, Department Of Trade And Industry(dti) For Sole Proprietorship And Cda For Cooperatives C) Valid Mayor’s Permit By The City Or Municipality Where The Principal Place Of Business Is Located D) Tax Clearance Per Eo 398 E) Tax Clearance For Collection Purposes Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid Completed Within The Last Five(5) Years, Except Under Conditions Provided Under The Rules; And • The Statement Shall Include The Following: (1)name Of The Contract; (2)date Of The Contract; (3)contract Duration; (4)owner’s Name And Address; (5)nature Of Work; (6)contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation; (7)total Contract Value At Award; (8)date Of Completion Or Estimated Completion Time; (9)total Contract Value At Completion, If Applicable; (10)percentages Of Planned And Actual Accomplishments, If Applicable; (11)value Of Outstanding Works, If Applicable; (12)the Statement Shall Be Supported By The Notices Of Award And/or Notices To Proceed Issued By The Owners; And (13)the Statement Shall Be Supported By The Constructors Performance Evaluation System (cpes) Rating Sheets, And/or Certificates Of Completion And Owner’s Acceptance, If Applicable; ⬜ (d) Valid Pcab License-category B, Size Range Medium A Or Higher/special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. (h) Affidavit Of Site Inspection Financial Documents ⬜ (i) Audited Financial Statement Stamped Received By The Bureau Of Internal Revenue(bir) Or Its Duly Authorized Institutions, For The Immediately Preceding Calendar Year, Which Should Not Be Earlier From Two(2) Years From The Date Of Submission (j) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (k) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (l) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (m) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (n) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (o) Cash Flow By Quarter. Instruction To Bidders 1. Scope Of Bid The Procuring Entity, Local Government Unit Of Irosin Invites Bids For The Irosin Memorial Park Improvement, With Project Identification Number Infr-02-2025. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project (referred To Herein As “project”) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 20% Edf 2024 In The Amount Of Two Million Forty Eight Thousand Nine Hundred Fifty Pesos ( P 2,048,950.00). 2.2. The Source Of Funding Is: 20% Edf 2024 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. Subcontracting Is Not Allowed During The Bidding. 7.2. Subcontracting Is Not Allowed During The Contract Implementation Stage. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On January 16, 2025, 2:00pm And Either At Its Physical Address Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon In A Face-to-face Manner As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Special Pcab License In Case Of Joint Ventures, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: Philippine Pesos 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty(120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Irosin Memorial Park Improvement I.clearing And Grubbing Ii. Excavation/backfilling Iii. Sub-grade Preparation Iv. Aggregate Base-course V. Portland Cement Concrete Pavement Spl-1 Ppe’s Spl-2 Temporary Facilities Spl-3 Project Signage 7.1 Not Applicable Since Sub-contracting Is Not Allowed. 10.3 The Other Contractor’s License Or Permit Required Is Bir Registration. 10.4 Irosin Memorial Park Improvement The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel General Experience Relevant Experience 1. Foreman 2. He And Le Operator 3. Skilled Worker 4.laborer 10.5 Irosin Memorial Park Improvement The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units 1.backhoe 2. Road Roller 3. Concrete Mixer 4. Concrete Cutter 5. Bar Cutter 6. Concrete Vibrator 6. Enough Handtools 12 Value Engineering Clause Is Not Allowed. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. [two Percent (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. [five Percent (5%) Of Abc] If Bid Security Is In Surety Bond. 19.2 Partial Bids Are Not Allowed. 20 Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It: Bir Registration 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And Other Acceptable Tools Of Project Scheduling. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Irosin Memorial Park Improvement Gcc Clause 2 Sectional Completion Is Not Applicable Since All Works Must Be Completed Within 60 Calendar Days. 4.1 The Schedule Of Delivery Of The Possession Of The Site To The Contractor, Whether Full Or In Part Is Seven(7) Calendar Days After The Issuance Of The Notice To Proceed(ntp). 6 The Site Investigation Reports Are: Additional Facilities For The Municipal Cemetery. 7.2 In Case Of Permanent Structures, Such As Buildings Of Types 4 And 5 As Classified Under The National Building Code Of The Philippines And Other Structures Made Of Steel, Iron, Or Concrete Which Comply With Relevant Structural Codes (e.g., Dpwh Standard Specifications), Such As, But Not Limited To, Steel/concrete Bridges, Flyovers, Aircraft Movement Areas, Ports, Dams, Tunnels, Filtration And Treatment Plants, Sewerage Systems, Power Plants, Transmission And Communication Towers, Railway System, And Other Similar Permanent Structures: Fifteen (15) Years. In Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures: Five (5) Years. In Case Of Other Structures, Such As Bailey And Wooden Bridges, Shallow Wells, Spring Developments, And Other Similar Structures: Two (2) Years. 10 A. Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Not Applicable Days Of Delivery Of The Notice Of Award. Not Applicable Since The End-user, Municipal Engineering Office, Was The One Who Made The Program Of Work(pow). 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is Not Applicable. Reason Was Stated In 11.1. 13 The Amount Of The Advance Payment Shall Not Exceed 15% Of The Total Contract Price And Schedule Of Payment. 14 15.1 The Date By Which Operating And Maintenance Manuals Are Required Is 120 Calendar Days After The Commencement Of Works. The Date By Which “as Built” Drawings Are Required Is 120 Calendar Days After The Commencement Of Works. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Not Applicable. Section Vi. Specifications Specifications Is Provided In The Program Of Work(pow) And Detailed Estimates Section Vii. Drawings Please Seek The Drawings At The Office Of The Municipal Engineer Of Local Government Unit Of Irosin. Section Viii. Bill Of Quantities Rehabilitation/improvement Of Brgy. Cawayan Level Ii Water System Item No. Scope Of Work Quantity Unit 1.direct Cost(dc) I Clearing And Grubbing Ii Excavation/backfilling Iii Sub-grade Preparation Iv Aggregate Base Course V Portland Cement Concrete Pavement Spl-1 Ppe’s Spl-2 Temporary Facilities Spl-3 Project Signage 2 Indirect Cost(ic), Contractor’s Mark-up 2.1 Contractor’s Profit(10% Of Direct Cost) 2.2 Ocm(15% Of Direct Cost) 2.3 Vat Component (5% Of Contractor’s Profit+dc+ocm) 2.4 Mobilization Total Cost Of All Line Item Includes Cost Of Contractor’s Profit, Taxes And Ocm. Attached Detailed Cost Estimates Section Ix. Bidding Forms Table Of Contents Bid Form Form Of Contract Agreement Omnibus Sworn Statement Affidavit Of Site Inspection Bid Securing Declaration Bid Form Date: Project Id No.: Infr-02-2025 To: [name And Address Of Procuring Entity] Having Examine The Philippine Bidding Documents(pbds) Including The Supplemental Or Bid Bulletin Numbers ______, The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Declare That: (a) We Have Reservation To The Pbds, Including The Supplemental Or Bid Bulletins, For The Procurement Projects, Irosin Memorial Park Improvement; (b) We Offer To Execute The Works For This Contract In Accordance With The Pbds; (c) The Total Price Of Our Bid In Words And Figures , Excluding Any Discounts Offered Below Is (insert Information); (d) The Discounts Offered And The Methodology For Their Application Are: [insert Information) (e) The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: Value Added Tax, Income Tax, Local Taxes And Other Fiscal Levies And Duties Which Are Itemized Herein And Reflected In The Detailed Estimates; (f) Our Bid Shall Be Valid Within A Period Stated In The Pbds, And It Shall Remain Binding Upon Us At Any Time Before The Expiration Of That Period; (g) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract, Or A Performance Securing Declaration In Lieu Of The Allowable Forms Of The Performance Security, Subject To The Terms And Conditions Of Issued Gppb Guidelines For This Purpose; (h) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (i) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (j) We Understand That You Are Not Bound To Accept The Lowest Evaluated Bid Or Any Other Bid That You May Receive. (k) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Irosin Memorial Park Improvement. (l) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be Ground For The Rejection Of Our Bid. Name: Legal Capacity: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Contract Agreement For The Procurement Of Infrastructure Projects(revised) __________________________________________________________________________ This Agreement, Made This [insert Date] Day Of [insert Month], [insert Year] Between [name And Address Of Procuring Entity] (hereinafter Called The“entity”) And [name And Address Of Contractor] (hereinafter Called The “contractor”). Whereas, The Entity Is Desirous That The Contractor Execute [name And Identification Number Of Contract] (hereinafter Called “the Works”) And The Entity Has Accepted The Bid For [insert The Amount In Specified Currency In Numbers And Words] By The Contractor For The Execution And Completion Of Such Works And The Remedying Of Any Defects Therein. Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents As Required By The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 Shall Be Deemed To Form And Be Read And Construed As Part Of This Agreement, Viz.: A. Philippine Bidding Documents(pbds) I.drawings/plans; Ii.specifications; Iii.bill Of Quantities Iv.general And Special Conditions Of Contract; V.supplemental Or Bid Bulletins B. Winning Bidder’s Bid, Including The Eligibility Requirements, Technical And Financial Proposals, And All Other Documents Or Statements Submitted; Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes, And All Other Documents Submitted(e.g., Bidder’s Response To Request For Clarifications On The Bid), Including Corrections To The Bid, If Any, Resulting From The Procuring Entity’s Bid Evaluation; C. Performance Security D. Notice Of Award Of Contract And The Bidder’s Conforme Thereto; And E. Other Contract Documents That May Be Required By Existing Laws And/or The Procuring Entity Concerned In The Pbds. Winning Bidder Agrees That Additional Contract Documents Or Information Prescribed By The Gppb That Are Subsequently Required For Submission After The Contract Execution, Such As The Notice To Proceed, Variation Orders And Warranty Security, Shall Likewise Form Part Of The Contract. 3. In Consideration For The Sum Of [total Contract Price In Words And Figures) Or Such Other Sums As May Be Ascertained, [name Of Bidder] Agrees To Execute The Works For The [state The Object Of The Contract] In Accordance With His/her/its Bid. 4. The [name Of The Procuring Entity] To Pay The Above-mentioned Sum In Accordance With The Terms Of Bidding. In Witness, Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Binding Signature Of The Procuring Entity: Binding Signature Of Contractor: Insert Name And Signature] [insert Name And Signature] [insert Signatory’s Legal Capacity] [insert Signatory’s Legal Capacity] Signed In The Presence Of: ______________________ ________________ Municipal Engineer Liaison Officer For: For: [insert Procuring Entity] [insert Name Of Supplier] Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Contract Agreement And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. This Instrument Consists Of ____ Pages Including This Page On Which The Acknowledgement Is Written Duly Signed By The Contracting Parties And Their Witnesses. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Omnibus Sworn Statement(revised) Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g. Duly Notarized Secretary’s Certificate, Board/partnership Resolution Or Special Power Of Attorney, Whichever Is Applicable]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For And In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay, Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Of Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling(estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 Series Of 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This ___________ Day Of __________________, 2025 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Infr-02-2025 Irosin Memorial Park Improvement Irosin, Sorsogon Standard Form Number: Sf-infr-51 Revised On: August 11, 2004 Affidavit Of Site Inspection I, ________________________, Of Legal Age, _____________, Filipino And Residing At __________________________, Under Oath, Hereby Depose And Say: 1. That I Am The _________________________ Of The ____________________________________________, With Office Address At ______________________________; 2. That I Have Inspected The Site For Irosin Memorial Park Improvement; 3. That I Am Making This Statement As Part Of The Requirement For The Technical Proposal Of The _________________________ Of ___________________________. In Faith Whereof, I Hereby Affix My Signature This ______ Day Of ________, 2025 At _________________________, Philippines. ___________________ Affiant Subscribed And Sworn To Before Me This ____ Day Of _________ 2025, Affiant Exhibiting To Me His/her Community Tax Certificate No. _______________ Issued On ________________ At ______________________________, Philippines. _______________________ Notary Public Until ______________ Ptr No. ______________ Date ______________ Place ______________ Tin ______________ Doc No. __________ Page No. _________ Book No. _________ Series Of _________. Republic Of The Philipppines ) City Of Sorsogon ) S.s. X ---------------------------------------------------x Bid Securing Declaration Project Identification No. Infr-02-2025 To: [insert Name And Address Of Procuring Entity] I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two(2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen(15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1(f) Of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid-securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am Declared Ineligible Or Post Disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And (c) I Am/we Declared As The Bidder With The Lowest Calculated And Responsive Bid And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I Have Hereunto Set My Hand This _____ Day Of ________, 2025 At __________________. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. __________ Page No. __________ Book No. __________ Series Of 2025.
Closing Date31 Jan 2025
Tender AmountPHP 2 Million (USD 34.9 K)

STATE, DEPARTMENT OF USA Tender

Others...+2Electrical and Electronics, Solar Installation and Products
Corrigendum : Closing Date Modified
United States
Details: U.s. Embassy Malabo date: December 20, 2024 request For Quotation # 19ek2025q0002 replacement Of On-compound Residential Solar Water Heaters the U.s. Embassy In Malabo, Equatorial Guinea Invites Vendors To Submit A Quotation For The Replacement Of On-compound Residential Solar Water Heaters. instructions To Quoters: in Order For Your Quotation To Be Considered, Each Offer Must Include The Following: completed Pricing Table – Section I - A. completed Quoter’s Info – Section Ii. completed Technical Requirements, To Include The Following Information Demonstrating The Quoter’s Ability To Perform: name Of A Project Manager (or Another Liaison To The Embassy) Who Understands Written And Spoken English. evidence That The Quoter Operates Established Business With A Permanent Address And Telephone Listing. evidence That The Quoter Has The Necessary Personnel, Equipment, And Financial Resources Available To Perform The Work. a Proof Showing That Contractor Has Already Started The Sam Registration Process. Sam Registration “system For Award Management” Is Required For Contracts Exceeding Us$30,000.00. See Exhibit A And The Following Link For Further Instructions: Https://www.fsd.gov/sys_attachment.do?sys_id=9a12412bdb7bbd90a8cb4a391396194f contractor’s Certification Regarding The National Defense Authorization Act (ndaa) Clauses (52.204-24, 52-204-25 And 52-204-26). See Certification Instructions In Exhibit B. your Quotation By Email To Malabop@state.gov No Later Than Close Of Business On Monday, Jan 6, 2025. No Quotation Will Be Accepted After This Time. you Are Encouraged To Make Your Quotation Competitive. The Rfq Does Not Commit The American Embassy To Make Any Award. The Embassy May Cancel This Rfq Or Any Part Of It. The Embassy May Award Multi Contracts Against This Requirement And It Reserves The Right To Reject Proposals/quotations That Are Unreasonably Low Or High In Price. direct Any Questions Regarding This Rfq By Email To Malabop@state.gov thank You. section I pricing Table no. description total Cost (usd) 1 replacement Of On-compound Residential Solar Water Heaters grand Total: b. Statement Of Work introduction overview & Description: The U.s. Embassy Malabo Requires The Replacement Of On-compound Residential Solar Water Heaters. The Solar Water Heaters Were Originally Installed During Initial Construction And Are At The End Of Their Useful Life. Many Have External Leaks And Are Isolated From The System. location: The Facility, U.s. Embassy Is Located In The Capital Of Equatorial Guinea, Malabo. All Onsite Inspections Shall Be Requested Through The U. S. Embassy’s Facility Manager (fm) Or Contracting Officer Representative (cor). objective: The Objective Of Solar Water Heater Replacement Is To Restore Efficiency To The Water Heating System And Reduce The Burden On Electrical Water Heaters, Effectively Extending Their Life. communication: The Fac Team Maintain Contact With The Project Lead: Michael Macsay, Facility Manager (fm), U.s. Embassy Malabo, Email: Macsaymd@state.gov, Mobile: +240-555-000-306. project Phases receipt And Inspection: Once Solar Water Heaters Are Received, They Will Be inspected By Facilities (fac) Personnel For Damage From Shipping. removal And Installation: Old Solar Water Heaters Will Be Removed From The system And Lowered To The Ground For Disposal. Replacement Water Heaters Will Be Raised To The Roof And Installed Per Manufacturer’s Instructions. 2.2.1 Note: A Crane And Rigging Will Be Required To Remove And Install Solar Water Heaters. commissioning: Upon Complete Installation, Solar Water Heaters Will Be Tested and Commissioned Within The Guidelines Set By The Manufacturer. general Requirements work Shall Be Performed In Accordance With Overseas Building Operations (obo) Safety, Health, And Environmental Management (shem) Standards. Proper Lifting And Rigging Practices Shall Be Followed During Installation And Removal The Solar Water Heaters. proper Ppe Shall Be Worn At All Times During The Removal/installation Process. work Shall Be Performed In Accordance With The Manufacturer’s Guidelines To Ensure Warranty Is Not Voided. any Damage To Grass And/or Vegetation During Removal And Installation Of Solar Water Heaters Shall Be The Responsibility Of The Fac Team To Replace. Precautions Shall Be Taken To Ensure Damage To Post’s Grass And Vegetation Is Minimized. responsibilities Of The Fac Team project Safety Plan (psp): Fm/posho And Aposho Will Develop A Project Safety Plan Using Us Army Corp Of Engineers (usace) Em385-1-1. The Plan Will Be Communicated To The Fac Staff Performing The Work. fac Staff Shall Adhere To The Project Safety Plan Throughout The Duration Of The Project. Safety Violations And Injuries Shall Be Reported Immediately To The Posho/aposho. quality Management Plan (qmp): Fm Shall Establish A Quality Management Plan To Include Inspection To Adherence With Installation Guide. Regular Inspections Between Coatings Will Be Conducted With The Designated Supervisor Of The Crew. The Crew Shall Repair Any Inconsistencies Found Within The Coatings As Defined By The Qmp. pre-project Requirements tooling & Materials: All Tooling And Materials Shall Be Inventoried Prior To The Start Of The Project To Ensure Efficiency And The Success Of The Project. All Tooling Will Be Approved By The Fm And Designated Project Supervisor Prior To Ordering. storage: Storage Shall Be Maintained In Accordance With The Storage Instructions From The Manufacturer. Proper Storage Of Resurfacing Materials Is Essential, And A Space Shall Be Identified Prior To The Project Start. all Workers Shall Review The Qmp To Understand The Standards To Be Met In The Application Of The Tennis Court Resurfacing. Any Deviation From The Installation Guide And Manufacturers Standards, May Cause The Resurfacing Materials To Degrade Or Fail Earlier Than Expected. all Workers Shall Review The Psp Set By The Fm/posho To Ensure Standards Set Forth Can And Will Be Adhered To. project Requirements all Workers Shall Adhere To The Psp Set Forth By The Fm/posho. all Workers Shall Adhere To The Qmp And Request Inspections Or Understand That Surprise Inspections Will Be Conducted To Ensure Quality Of Work. supervisor And Workers Will Adhere To The Manufacturer’s Installation Guide. technical Specifications: Refer To Appendix A For Technical Specifications Of The Solar Water Heater Requirements. reference Material work Shall Be Performed In Accordance With The Following References: manufacturer’s Installation Guide. usace 385-1-1. post Quality Management Plan (qmp) appendix A technical Specifications component specification collector Housing uv Protected cover antireflex Glass (double Coated) absorber/tank Capacity 40 Gal (150 Liter) absorber/tank Construction steel section Ii contractor’s Information & Signatures: contractor’s Name company Name address uei # ncage # office Tel # fax # mobile # email name Of Person Authorized To Sign: ___________________________________________________________ signature Of Person Authorized: ______________________________________________________________ the Penalty For Making False Statements Is Prescribed In The U.s. Criminal Code, 18 U.s.c. 1001 exhibit A sam.gov Registration the Federal Acquisition Regulation (far) - Clause # 52.204-7 - Requires All Contractors To Be Registered In The System For Award Management “sam” Database. Registration In Sam Is Mandatory Prior To Signing Any Contract That Exceeds $30,000. As We Would Like To Continue Working With You In The Near Future, We Suggest That You Start The Registration Process Asap As This Requirement Is Time Consuming. the Registration Process Starts With Obtaining A Uei Number And A Ncage Code. You Should Be Prepared To Provide The Following Information: (i) Company Legal Business. (ii) Trade Style, Doing Business, Or Other Name By Which Your Entity Is Commonly Recognized. (iii) Company Physical Street Address, City, State, And Zip Code. (iv) Company Mailing Address, City, State And Zip Code (if Separate From Physical). (v) Company Telephone Number. (vi) Date The Company Was Started. (vii) Number Of Employees At Your Location. (viii) Chief Executive Officer/key Manager. (ix) Line Of Business (industry). (x) Company Headquarters Name And Address (reporting Relationship Within Your Entity). if A Contractor Does Not Become Registered In The Sam Database In The Time Prescribed By The Contracting Officer, The Contracting Officer Will Proceed To Award To The Next Otherwise Successful Registered Contractor. if You Have Any Questions During The Registration Process, You Will Need To Contact The Customer Service For Sam By Registering Or Contacting The Following Website: federal Service Desk url: Www.fsd.gov hours: 8am - 8pm (eastern Time) us Calls: 866-606-8220 international Calls: 334-206-7828 dsn: 866-606-8220 exhibit B ndaa Certification the Us Embassy Must Comply With Section 889(a)(1)(b) Of The Fy2019 National Defense Authorization Act And Is Prohibited From Entering Into A Contract, Or Extending Or Renewing A Contract With An Entity That Uses Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System, Unless A Waiver Is Granted. as Defined In Statute, Covered Telecommunications Equipment Or Services Means The Following: Telecommunications Equipment Produced By Huawei, Zte, Hikvision, Dahua, And Hytera, Or Their Subsidiaries Or Affiliates. contractor’s Certification: contractor’s Certification In Response To The National Defence Authorization Act (ndaa) Clauses (52.204-24, 52-204-25 And 52-204-26) – The Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment: by Affixing Your Authorized Signature In Section Ii And Submitting This Certification, The Undersigned Certifies That Neither It, It’s Principals Nor Affiliates, Will Be Supporting The Us Embassy Using The Proscribed Equipment Or Services. far Clauses Incorporated In Full Text: 52.204-24 Representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment (aug 2020) the Offeror Shall Not Complete The Representation At Paragraph (d)(1) Of This Provision If The Offeror Has Represented That It “does Not Provide Covered Telecommunications Equipment Or Services As A Part Of Its Offered Products Or Services To The Government In The Performance Of Any Contract, Subcontract, Or Other Contractual Instrument” In The Provision At 52.204-26, Covered Telecommunications Equipment Or Services—representation, Or In Paragraph (v) Of The Provision At 52.212-3, Offeror Representations And Certifications-commercial Items. (a) Definitions. As Used In This Provision- backhaul, Covered Telecommunications Equipment Or Services, Critical Technology, Interconnection Arrangements, Reasonable Inquiry, Roaming, And Substantial Or Essential component Have The Meanings Provided In The Clause 52.204-25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (b) Prohibition. (1) Section 889(a)(1)(a) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of An Executive Agency On Or After August 13, 2019, From Procuring Or Obtaining, Or Extending Or Renewing A Contract To Procure Or Obtain, Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. Nothing In The Prohibition Shall Be Construed To— (i) Prohibit The Head Of An Executive Agency From Procuring With An Entity To Provide A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or (ii) Cover Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Cannot Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles. (2) Section 889(a)(1)(b) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of An Executive Agency On Or After August 13, 2020, From Entering Into A Contract Or Extending Or Renewing A Contract With An Entity That Uses Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. This Prohibition Applies To The Use Of Covered Telecommunications Equipment Or Services, Regardless Of Whether That Use Is In Performance Of Work Under A Federal Contract. Nothing In The Prohibition Shall Be Construed To— (i) Prohibit The Head Of An Executive Agency From Procuring With An Entity To Provide A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or (ii) Cover Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Cannot Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles. (c) Procedures. The Offeror Shall Review The List Of Excluded Parties In The System For Award Management (sam) (https://www.sam.gov) For Entities Excluded From Receiving Federal Awards For “covered Telecommunications Equipment Or Services.” (d) Representations. The Offeror Represents That— (1) It [] Will, [] Will Not Provide Covered Telecommunications Equipment Or Services To The Government In The Performance Of Any Contract, Subcontract Or Other Contractual Instrument Resulting From This Solicitation. The Offeror Shall Provide The Additional Disclosure Information Required At Paragraph (e)(1) Of This Section If The Offeror Responds “will” In Paragraph (d)(1) Of This Section; And (2) After Conducting A Reasonable Inquiry, For Purposes Of This Representation, The Offeror Represents That— it [] Does, [] Does Not Use Covered Telecommunications Equipment Or Services, Or Use Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services. The Offeror Shall Provide The Additional Disclosure Information Required At Paragraph (e)(2) Of This Section If The Offeror Responds “does” In Paragraph (d)(2) Of This Section. (e) Disclosures. (1) Disclosure For The Representation In Paragraph (d)(1) Of This Provision. If The Offeror Has Responded “will” In The Representation In Paragraph (d)(1) Of This Provision, The Offeror Shall Provide The Following Information As Part Of The Offer: (i) For Covered Equipment— (a) The Entity That Produced The Covered Telecommunications Equipment (include Entity Name, Unique Entity Identifier, Cage Code, And Whether The Entity Was The Original Equipment Manufacturer (oem) Or A Distributor, If Known); (b) A Description Of All Covered Telecommunications Equipment Offered (include Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); And (c) Explanation Of The Proposed Use Of Covered Telecommunications Equipment And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(1) Of This Provision. (ii) For Covered Services— (a) If The Service Is Related To Item Maintenance: A Description Of All Covered Telecommunications Services Offered (include On The Item Being Maintained: Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); Or (b) If Not Associated With Maintenance, The Product Service Code (psc) Of The Service Being Provided; And Explanation Of The Proposed Use Of Covered Telecommunications Services And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(1) Of This Provision. (2) Disclosure For The Representation In Paragraph (d)(2) Of This Provision. If The Offeror Has Responded “does” In The Representation In Paragraph (d)(2) Of This Provision, The Offeror Shall Provide The Following Information As Part Of The Offer: (i) For Covered Equipment— (a) The Entity That Produced The Covered Telecommunications Equipment (include Entity Name, Unique Entity Identifier, Cage Code, And Whether The Entity Was The Oem Or A Distributor, If Known); (b) A Description Of All Covered Telecommunications Equipment Offered (include Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); And (c) Explanation Of The Proposed Use Of Covered Telecommunications Equipment And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(2) Of This Provision. (ii) For Covered Services— (a) If The Service Is Related To Item Maintenance: A Description Of All Covered Telecommunications Services Offered (include On The Item Being Maintained: Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); Or (b) If Not Associated With Maintenance, The Psc Of The Service Being Provided; And Explanation Of The Proposed Use Of Covered Telecommunications Services And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(2) Of This Provision. (end Of Provision) 52.204-25 Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment (aug 2020) definitions. As Used In This Clause— backhaul Means Intermediate Links Between The Core Network, Or Backbone Network, And The Small Subnetworks At The Edge Of The Network (e.g., Connecting Cell Phones/towers To The Core Telephone Network). Backhaul Can Be Wireless (e.g., Microwave) Or Wired (e.g., Fiber Optic, Coaxial Cable, Ethernet). covered Foreign Country Means The People's Republic Of China. covered Telecommunications Equipment Or Services Means— (1) Telecommunications Equipment Produced By Huawei Technologies Company Or Zte Corporation (or Any Subsidiary Or Affiliate Of Such Entities); (2) For The Purpose Of Public Safety, Security Of Government Facilities, Physical Security Surveillance Of Critical Infrastructure, And Other National Security Purposes, Video Surveillance And Telecommunications Equipment Produced By Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, Or Dahua Technology Company (or Any Subsidiary Or Affiliate Of Such Entities); (3) Telecommunications Or Video Surveillance Services Provided By Such Entities Or Using Such Equipment; Or (4) Telecommunications Or Video Surveillance Equipment Or Services Produced Or Provided By An Entity That The Secretary Of Defense, In Consultation With The Director Of National Intelligence Or The Director Of The Federal Bureau Of Investigation, Reasonably Believes To Be An Entity Owned Or Controlled By, Or Otherwise Connected To, The Government Of A Covered Foreign Country. critical Technology Means— (1) Defense Articles Or Defense Services Included On The United States Munitions List Set Forth In The International Traffic In Arms Regulations Under Subchapter M Of Chapter I Of Title 22, Code Of Federal Regulations; (2) Items Included On The Commerce Control List Set Forth In Supplement No. 1 To Part 774 Of The Export Administration Regulations Under Subchapter C Of Chapter Vii Of Title 15, Code Of Federal Regulations, And Controlled— (i) Pursuant To Multilateral Regimes, Including For Reasons Relating To National Security, Chemical And Biological Weapons Proliferation, Nuclear Nonproliferation, Or Missile Technology; Or (ii) For Reasons Relating To Regional Stability Or Surreptitious Listening; (3) Specially Designed And Prepared Nuclear Equipment, Parts And Components, Materials, Software, And Technology Covered By Part 810 Of Title 10, Code Of Federal Regulations (relating To Assistance To Foreign Atomic Energy Activities); (4) Nuclear Facilities, Equipment, And Material Covered By Part 110 Of Title 10, Code Of Federal Regulations (relating To Export And Import Of Nuclear Equipment And Material); (5) Select Agents And Toxins Covered By Part 331 Of Title 7, Code Of Federal Regulations, Part 121 Of Title 9 Of Such Code, Or Part 73 Of Title 42 Of Such Code; Or (6) Emerging And Foundational Technologies Controlled Pursuant To Section 1758 Of The Export Control Reform Act Of 2018 (50 U.s.c. 4817). interconnection Arrangements Means Arrangements Governing The Physical Connection Of Two Or More Networks To Allow The Use Of Another's Network To Hand Off Traffic Where It Is Ultimately Delivered (e.g., Connection Of A Customer Of Telephone Provider A To A Customer Of Telephone Company B) Or Sharing Data And Other Information Resources. reasonable Inquiry Means An Inquiry Designed To Uncover Any Information In The Entity's Possession About The Identity Of The Producer Or Provider Of Covered Telecommunications Equipment Or Services Used By The Entity That Excludes The Need To Include An Internal Or Third-party Audit. roaming Means Cellular Communications Services (e.g., Voice, Video, Data) Received From A Visited Network When Unable To Connect To The Facilities Of The Home Network Either Because Signal Coverage Is Too Weak Or Because Traffic Is Too High. substantial Or Essential Component Means Any Component Necessary For The Proper Function Or Performance Of A Piece Of Equipment, System, Or Service. (b) Prohibition. (1) Section 889(a)(1)(a) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of An Executive Agency On Or After August 13, 2019, From Procuring Or Obtaining, Or Extending Or Renewing A Contract To Procure Or Obtain, Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. The Contractor Is Prohibited From Providing To The Government Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System, Unless An Exception At Paragraph (c) Of This Clause Applies Or The Covered Telecommunication Equipment Or Services Are Covered By A Waiver Described In Far 4.2104. (2) Section 889(a)(1)(b) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of An Executive Agency On Or After August 13, 2020, From Entering Into A Contract, Or Extending Or Renewing A Contract, With An Entity That Uses Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System, Unless An Exception At Paragraph (c) Of This Clause Applies Or The Covered Telecommunication Equipment Or Services Are Covered By A Waiver Described In Far 4.2104. This Prohibition Applies To The Use Of Covered Telecommunications Equipment Or Services, Regardless Of Whether That Use Is In Performance Of Work Under A Federal Contract. (c) Exceptions. This Clause Does Not Prohibit Contractors From Providing— (1) A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or (2) Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles. (d) Reporting Requirement. (1) In The Event The Contractor Identifies Covered Telecommunications Equipment Or Services Used As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System, During Contract Performance, Or The Contractor Is Notified Of Such By A Subcontractor At Any Tier Or By Any Other Source, The Contractor Shall Report The Information In Paragraph (d)(2) Of This Clause To The Contracting Officer, Unless Elsewhere In This Contract Are Established Procedures For Reporting The Information; In The Case Of The Department Of Defense, The Contractor Shall Report To The Website At Https://dibnet.dod.mil. For Indefinite Delivery Contracts, The Contractor Shall Report To The Contracting Officer For The Indefinite Delivery Contract And The Contracting Officer(s) For Any Affected Order Or, In The Case Of The Department Of Defense, Identify Both The Indefinite Delivery Contract And Any Affected Orders In The Report Provided At Https://dibnet.dod.mil. (2) The Contractor Shall Report The Following Information Pursuant To Paragraph (d)(1) Of This Clause: (i) Within One Business Day From The Date Of Such Identification Or Notification: The Contract Number; The Order Number(s), If Applicable; Supplier Name; Supplier Unique Entity Identifier (if Known); Supplier Commercial And Government Entity (cage) Code (if Known); Brand; Model Number (original Equipment Manufacturer Number, Manufacturer Part Number, Or Wholesaler Number); Item Description; And Any Readily Available Information About Mitigation Actions Undertaken Or Recommended. (ii) Within 10 Business Days Of Submitting The Information In Paragraph (d)(2)(i) Of This Clause: Any Further Available Information About Mitigation Actions Undertaken Or Recommended. In Addition, The Contractor Shall Describe The Efforts It Undertook To Prevent Use Or Submission Of Covered Telecommunications Equipment Or Services, And Any Additional Efforts That Will Be Incorporated To Prevent Future Use Or Submission Of Covered Telecommunications Equipment Or Services. (e) Subcontracts. The Contractor Shall Insert The Substance Of This Clause, Including This Paragraph (e), In All Subcontracts And Other Contractual Instruments, Including Subcontracts For The Acquisition Of Commercial Items. (end Of Clause) 52.204-26 Covered Telecommunications Equipment Or Services-representation (dec 2019) (a) Definitions. As Used In This Provision, “covered Telecommunications Equipment Or Services” Has The Meaning Provided In The Clause 52.204-25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (b) Procedures. The Offeror Shall Review The List Of Excluded Parties In The System For Award Management (sam) (https://www.sam.gov) For Entities Excluded From Receiving Federal Awards For “covered Telecommunications Equipment Or Services”. (c) Representation. The Offeror Represents That It □ Does, □ Does Not Provide Covered Telecommunications Equipment Or Services As A Part Of Its Offered Products Or Services To The Government In The Performance Of Any Contract, Subcontract, Or Other Contractual Instrument. (end Of Provision)
Closing Date21 Jan 2025
Tender AmountRefer Documents 
521-530 of 532 archived Tenders