Ppe Tenders

Ppe Tenders

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Chemical Products
United States
Closing Date5 Jul 2024
Tender AmountRefer Documents 
Details: Combined Synopsis-solicitation For Commercial Products And Commercial Services revision 01 effective: 05/30/2023 description this Is A Combined Synopsis/solicitation For Commercial Products And Services Prepared In Accordance With The Format In Federal Acquisition Regulation (far) Subpart 12.6, Streamlined Procedures For Evaluation And Solicitation For Commercial Products And Services, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested, And A Written Solicitation Document Will Not Be Issued. this Solicitation Is Issued As Rfq 36c24124q0673. The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2023-03. the Associated North American Industrial Classification System (naics) Code For This Procurement Is Naics 238220 (plumbing, Heating, And Air-conditioning Contractors) Size Standard $19 Million. va Connecticut Healthcare Systems, Newington Campus, Requires An Annual Cross Connection Survey And Testing Of All Backflow Preventer Devices Listed By Building And Room Number In Table 1 On The Pdf Attached Sow. Vachs Is Currently Seeking Services For All Labor, Materials, Transportation, Parts, And The Expertise Necessary To Provide Annual Testing, Maintenance, And Repair Or Replacement Of Backflow Prevention Devices Failing State Of Connecticut Mandated Testing Requirements. Please Reach Out To Chris Metner Christopher.metner@va.gov For All Technical Questions With The Below Sow. Please Submit Bids In The Form Of A Base Plus 4 Option Year Contract. an Optional Site Visit Will Take Place On Tuesday 07/02/2024 At 07:30 Am Check In At Building 3 On The 3rd Floor (fms Office) If You Have Trouble Finding The Location Please Call (203) 932-5711 X2061. all Interested Companies Shall Provide Quotations For The Following: statement Of Work background va Connecticut Healthcare Systems, Newington Campus, Requires An Annual Cross Connection Survey And Testing Of All Backflow Preventer Devices Listed By Building And Room Number In Table 1 Of The Pdf Attached Sow. Vachs Is Currently Seeking Services For All Labor, Materials, Transportation, Parts, And The Expertise Necessary To Provide Annual Testing, Maintenance, And Repair Or Replacement Of Backflow Prevention Devices Failing State Of Connecticut Mandated Testing Requirements. justification veterans Health Administration (vha) Seeks To Continue To Improve Operational Capabilities By establishing Services That Result In Fewer Operational Problems, Improved Communications, Increased Efficiency Within The Facility And To Improve The Quality Of Services To Veterans. location Of Services va Medical Center Newington 555 Willard Avenue newington, Ct 06111 period Of Performance base Contract Period Shall Be 07/26/2024 07/25/2025. The Contract Will Also Contain The Provision For 4 Option Years. qualifications to Be Considered Eligible For Competition, Potential Bidders Shall Have A Field Service Representative Located Within 75 Miles Of The Newington Campus Of The Va Connecticut Healthcare System. Contractor Shall Have Prior Knowledge Of The Newington Campus And The Backflow Preventers. Contractors Shall Possess Connecticut State Issued Certification/licensure To Test And Repair Cross Connections And Backflow Prevention Devices. Contractors Shall Have The Appropriate Equipment And Personnel Resources Available To Meet The Requirements Of This Sow. scope Of Work the Contractor Shall Furnish All Labor, Materials, Equipment, Tools, Supervision, And All Incidentals To Provide The Testing And Certification Of The Back Flow Preventer Devices And Cross Connections Described In Table 1 On The Pdf Attached Sow. The Contractor Shall Maintain An Accurate Log File/inventory Of All Cross Connections And Backflow Preventer Devices. If A Backflow Preventer Device Fails Test, The Contractor Shall Also Assume Responsibility To Identify The Requirements For Repair, Complete The Required Repairs, And Provide Proof Of The Device Having Passed The Ct State Testing Requirements Post Repair. All Failed Devices Shall Be Rectified Within A Period Not To Exceed 14 Calendar Days After The Initial Failure Is Reported. 1. The Service Provider Will Be Coordinating, Scheduling, And Reporting All Work-related Activities And Will Provide Necessary Information As Required By The Cor/va Fms Representative. The Responsibilities Shall Include: A. Complete Testing Of Backflow Preventer Devices Listed In Table 1. B. Directly Supervise All Testing And Any Subsequent Repair Work. c. Repair Or Replace Backflow Prevention Devices That Have Failed Testing Requirements Within 14 Days Of A Failed Test. d. The Tester Will Prepare A Paper Copy Of The Test Report To Be Left With The Va Fms Representative As Well As Provide A Copy To The State Of Connecticut As Required By Applicable Codes. Each Report Shall At A Minimum Include, The Device Serial Number, Tester S Name, Signature, Test Date, And Test Results. e. Results Of Failed Tests Shall Be Reported Immediately By Email, And By Phone Or In Person. Notify The Va Fms Representative Through Email Of Any Defective Device(s), And The Requirements For Repair As Set Forth In The Ct Dph Regulations. f. Contractor Shall Adhere To All Applicable Va, State, And Federal Safety Policies. g. Schedule And Coordinate Areas To Be Tested With The Cor Or Va Fms Representative And Provide A Minimum Three (3) Week Notice. 2. Lockout/tagout Backflow Preventer Devices Iaw Applicable Contractor And Va Policies. a. Acknowledgement Of Va Loto Requirements (attachment C) And Contractor Loto Policy. 3. Entry Into Confined Spaces Shall Be In Accordance With Applicable Contractor And Va Policies. a. Contractor Shall Furnish Ppe For Entry Into Confined Spaces And Shall Provide Rescue Teams Associated With Work Requirements Per Contractor And Va Policies And Procedures. 4. Replacement Parts Should Be Consistent With Existing Equipment And Oem Requirements And Specifications. Repairs Are To Be Made With Oem Spec, And/or American Made Products. 5. Annual Inspection Of Backflow Preventer Devices Shall Be In Conformance With The Following Standards/codes/specifications/regulations To Include But Not Limited To: a. American Backflow Prevention Association (abpa); b. American Society Of Safety Engineers (asse); c. Va Directives And Policies d. National Fire Protection Association (nfpa) 13 And 25 e. American Society For Testing And Materials (astm) f. Local, Municipal, State, And Federal Regulations Pertaining To Preservation And Maintenance Of Public Water Supplies And Potable And Non-potable Water Sources. submittals/deliverables 1. The Service Provider Shall Furnish Certificates Of Calibration For All Instruments Used In Conducting Testing Including, Function, Minimum Range, Minimum Accuracy, Minimum Resolution, Manufacturer, Model, Serial Number, Frequency Of Calibration, And Date Of Last Calibration. a. Contractors Shall Provide Documentation Detailing A Valid Calibration And The Instrumentation Shall Meet The Accuracy/calibration Requirements Established By The State Of Connecticut. The Contractor Shall Also Provide Calibration History Of The Instrument(s) To Be Used For Test. 2. The Contractor Shall Submit Any Waste Manifest Documents As Applicable With Final Reports. 3. Submit Names And Qualifications Of Specialists A Minimum Of Ten (10) Business Days Prior To Starting Annual Testing In Writing To The Cor, Pm, And The Va Contracting Officer. Subcontracting Of Any Ensuing Award Of This Solicitation Shall Not Be Allowed Without Written Permission Of The Contracting Officer. Service Response On Calls From Unauthorized Personnel Could Result In Non-payment. 4. Prior To The Start Of Work, The Specifications Shall Require The Contractor To Develop And Submit Such Plans As Required By The Va Relating To Safety And Environmental Issues. These May Include But Are Not Limited To: a. Job Hazard Analysis (jha) / Activity Hazard Analysis (aha) b. Acknowledgement Of Va Loto Requirements (attachment C) And Contractor Loto Policy. c. A Work Plan Detailing The Devices Identified For Test And The Dates And Times Planned For Testing. d. A Safety Plan For Devices Requiring Entry Into Confined Spaces. 5. Work Hours For Service And Corrective Maintenance Shall Be As Follows: a. Normal Routine Service Shall Occur During Normal Business Hours. 7:30 A.m. To 4:00 P.m., Monday Through Friday. Inspections Shall Not Interfere With Patient Care. In Special Instances Where Work Interferes With Patient Care The Contractor Shall Coordinate With The Va Representative To Schedule Accordingly. b. Annual Inspections, Repairs And Preventative Maintenance Work Shall Be Completed No Less Than One Calendar Month Before The End Of Each Annual Contract Period. c. Contractor Shall Cover All Costs For Preventative Maintenance Services For Labor And Materials (e.g. Calibrations Of Gauges, Valves, Equipment Settings, Transmitters And Controls Including Shipping, Handling, And Freight.) d. All Labor, Materials, Parts, And Supplies For Corrective & Emergency Maintenance Shall Be Included As Part Of The Bid. Contractor Shall Submit All Proposals Within Two (2) Working Days Of Field Assessment For Determination Of Issue(s) And Acceptance Of Corrective Action Plan. e. Authorization To Procure And Complete Corrective/emergency Maintenance Work Shall Be Per Written Direction Of The Va Contracting Officer Or Per Purchase Order Number Issuance Upon Approval And Funding Of Cost For Correction And Upon Which The Contractor Shall Provide All Labor, Parts, And Or Materials Necessary For Correction/emergency Maintenance Work. special Instructions 1. Contractor Shall Include An Additional Line Item For $5000 Annually To Apply To Incidentals For Repair. Addressing Repairs That Result In Spending In Excess Of The Initial $5000 Will Be At The Discretion Of The Contracting Officer (co). Va Connecticut Healthcare System Newington Backflow Preventer Inspection And Repair 2. Subcontracting Of Any Ensuing Award Of This Solicitation Shall Not Be Allowed Without Written Permission Of The Contracting Officer. Service Response On Calls From Unauthorized Personnel Could Result In Non-payment. 3. Contractor Check-in: All Employees Of The Service Provider Shall Comply With Va Security Management Program And Obtain Permission Of The Va Police And Restricted From Unauthorized Access. Upon Arrival, The Contractor Shall Sign-in At Building 3, 3rd Floor, Fms Office And/or Receive A Temporary Identification Badge Prior To Performing Services At Va Connecticut Healthcare System. The Contractor Shall Wear Visible Identification Always Displaying The Name And Company Id While On Site. All Site Visits Shall Be Coordinated With The Va Cor. a. The Contracting Officer (co), Contracting Officer S Representative (cor), And/or Project Manager (pm) Specifically Reserve The Right To Reject Any Of The Contractor S Personnel And Refuse Them Permission To Work On The Equipment Outlined Herein, Based Upon Credentials Provided. 4. Work Hours For Service And Corrective Maintenance Shall Be As Follows: a. Normal Routine Service Shall Occur During Normal Business Hours. 7:30 A.m. To 4:00 P.m., Monday Through Friday. b. Annual Inspections, Repairs And Preventative Maintenance Work Shall Be Completed No Less Than One Calendar Month Before The End Of Each Annual Contract Period. c. Contractor Shall Cover All Costs For Preventative Maintenance Services For Labor And Materials (e.g. Calibrations Of Gauges, Valves, Equipment Settings, Transmitters And Controls Including Shipping, Handling, And Freight.). d. All Labor, Materials, Parts, And Supplies For Corrective & Emergency Maintenance Shall Be Included As Part Of The Bid. Contractor Shall Submit All Proposals Within Two (2) Working Days Of Field Assessment For Determination Of Issue(s) And Acceptance Of Corrective Action Plan. e. Authorization To Procure And Complete Corrective/emergency Maintenance Work Shall Be Per Written Direction Of The Va Contracting Officer Or Per Purchase Order Number Issuance Upon Approval And Funding Of Cost For Correction) And Upon Which The Contractor Shall Provide All Labor, Parts, And Or Materials Necessary For Correction/emergency Maintenance Work. 5. Documentation: At The Conclusion Of Each Repair And Scheduled Maintenance Visit, The Contractor Shall Provide A Written Service Report Indicating The Device Serial Number, Tester S Name, Signature, Test Date, And Test Results. 6. Per Va Directive 1805, Smoking Vaping, And Smokeless Tobacco Are Prohibited On The Grounds Of Va Facilities, Including In Vehicles. This Directive Applies To All Service Providers And Their Employees. 7. No Photography Of Va Premises Is Allowed Without Written Permission Of The Contracting Officer. Patients And Staff Are Not To Be Photographed At Any Time. 8. Va Reserves The Right To Close Down Or Shut Down The Facilities And Order Service Provider Employees Off The Premises In The Event Of A National Emergency. The Service Provider May Return To The Site Only With The Written Approval Of The Va Contracting Officer. 9. Prior To Commencing Work Onsite, All Service Providers And Provider Personnel Shall Furnish Proof Of Receipt Of Required Covid Vaccinations And Boosters In Compliance With Current Vha Directives. 10. Prior To Commencing Work Onsite, All Service Providers And Provider Personnel Shall Furnish Proof Of Receipt Of Required Tuberculosis Testing In Compliance With Vha Directive 1131(5), Dated June 04, 2021. 11. Parking For Service Provider And Its Employees Shall Be In Designated Areas Only. Service Provider To Coordinate With Cor. 12. The Service Provider Shall Confine All Operations (including Storage Of Materials) On Government Premises To Areas Authorized Or Approved By The Va Contracting Officer. The Service Provider Shall Hold And Save The Government, Its Officers, And Agents, Free And Harmless From Liability Of Any Nature Va Connecticut Healthcare System Newington Backflow Preventer Inspection And Repair Occasioned By The Service Provider S Performance. Working Space And Space Available For Storing Materials Shall Be As Determined By The Cor. Workers Are Subject To The Rules Of The Medical Center Applicable To Their Conduct. Execute Work In Such A Manner As To Reduce Impacts With Work Being Done By Others. 13. Billing: Provide Cor And/or Pm With A Report Or Statement Of Work Completed And Include statements With Request For Payment. Statement Should Include Service Completed And The Date Each Service Item Was Completed. Labor Charges Shall Be Billed Hourly, And Any Unused Labor Totals Will Be Credited Back To The Va Medical Center On The Next Billing Cycle, Upon Receipt Of The Service report. terms And Conditions 1. User Responsibility: The Contractor Shall Not Be Held Responsible Under The Terms Of This Contract For repairs To Equipment Necessitated By User Abuse And/or Misuse Of Equipment. 2. All Work Is Subject To Inspection, Review And Approval By The Plumbing Supervisor, Utility System Supervisor, Chief M&o, Chief Engineer, And/or Their Designees. evaluation Process award Will Be Made To The Best Price, As Determined To Be The Most Beneficial To The Government. Please Read Each Section Below Carefully For The Submittals And Information Required As Part Of The Evaluation. Failure To Provide The Requested Information Below Shall Be Considered Non-compliant And Your Quote Could Be Removed From The Evaluation Process. vendors Quotes Shall Be Evaluated Under Far Part 13.106-2(b) -- Evaluation Of Quotations Or Offers. The Government Will Award A Contract Resulting From This Solicitation To The Responsible Vendor Whose Quote Conforming To The Solicitation Will Be Most Advantageous To The Government, Price, Past Performance, And Capabilities. The Following Factors Shall Be Used To Evaluate Offers: 1. Price (follow These Instructions): a. Vendor Shall Provide A Quote For The Services Above. Vendors Must Also Provide All Applicable Labor Rates For The Solicited Services So They Can Be Compared To The Applicable Wage Determination For Compliance With The Service Contract Labor Standards (scls) If Applicable. b. Ensure Your Validation Is Current In The System For Award Management (sam)( Https://www.sam.gov). Federal Acquisition Regulations Require That Federal Contractors Register In The Sam Database At Http://www.sam.gov And Enter All Mandatory Information Into The System. Award Cannot Be Made Until The Contractor Has Registered. Offerors Are Encouraged To Ensure That They Are Registered In Sam Prior To Submitting Their Quotation. 2. Capable: The Vendors Quote Shall Be Evaluated To Determine If The Organization Has The Experience And Capabilities To Provide The Requested Services In Accordance With The Statement Of Work In A Timely Efficient Manner. a. Contractor Shall Demonstrate Their Corporate Experience And Approach To Meet All Requirements. b. Contractor Shall Provide A List Of All Services Included In The Price. c. Contractor Shall Provide All Current And Relevant Licenses And/or Certifications For The State Of Service If Applicable. d. If You Are Planning To Sub-contract Some Or All Of This Work, Please Provide The Name And Address(s) Of All Subcontractor(s) (if Applicable) And A Description Of Their Planned Subcontracting Effort. e. Contractor Shall State And/or Demonstrate Their Ability To Meet All Requirements And Deliverables Stated In This Solicitation And Statement Of Work. Any Additional Information To Further Identify How The Company Is Experienced And Capable Of Performing The Requested Work Is Welcome. 3. Veterans Preference Factor (per 852.215-70): The Government Will Assign Evaluation Credit For An Offeror (prime Contractor) Which Is A Service-disabled Veteran-owned (sdvosb) Or A Veteran-owned Small Business (vosb). Non-sdvosb/vosb Offerors Proposing To Use Sdvosbs Or Vosbs As Subcontractors Will Receive Some Consideration Under This Evaluation Factor. a. For Sdvosbs/vosbs: In Order To Receive Credit Under This Factor, An Offeror Shall Submit A Statement Of Compliance That It Qualifies As A Sdvosb Or Vosb In Accordance With Vaar 852.215-70, Service-disabled Veteran-owned And Veteran-owned Small Business Evaluation Factors . Offerors Are Cautioned That They Must Be Registered And Verified In Vendor Information Pages (vip) Database (http://www.vetbiz.gov). i. Verified Sdvosbs Will Receive A 5% Price Credit (e.g. If A Sdvosb Submits An Offer Of $100.00, It Will Be Evaluated As If It Submitted An Offer Of $95.00). ii. Verified Vosbs Will Received A 2.5% Price Credit (e.g. If A Vosb Submits An Offer Of $100.00, It Will Be Evaluated As If It Submitted An Offer Of $97.50). the Full Text Of Far Provisions Or Clauses May Be Accessed Electronically At Http://acquisition.gov/comp/far/index.html. (x) Please Include A Completed Copy Of The Provision At 52.212-3, Offeror Representations And Certifications -- Commercial Items, With Your Offer Via The Sam.gov Website Or A Written Copy. (xi) Clause 52.212-4, Contract Terms And Conditions -- Commercial Items, Applies To This Acquisition In Addition To The Following Addenda S To The Clause: 52.252-2 Clauses Incorporated By Reference (feb 1998), 52.203-17 Contractor Employee Whistleblower Rights And Requirement To Inform Employees Of Whistleblower Rights (jun 2020), 52.204-4 Printed Or Copied Double-sided On Postconsumer Fiber Content Paper (may 2011), 52.204-13 System For Award Management Maintenance (oct 2018), 52.204-18 Commercial Government Entity Code Maintenance (aug 2020), 52.217-9 Option To Extend The Term Of The Contract (mar 2000), 52.228-5 Insurance-work On A Government Installation (jan 1997), 52.232-40 Providing Accelerated Payments To Small Business Subcontracting (dec 2013), 852.212-70 Provisions And Clauses Applicable To Va Acquisitions Of Commercial Items (apr 2020) 852.203-70 Commercial Advertising 852.219-74, Va Notice Of Total Service-disabled Veteran-owned Small Business Set-aside 852.232-72 Electronic Submissions Of Payment Requests 852.233-70 Protest Content/alternative Dispute Resolution 852.233-71 Alternate Protest Procedure 852.270-1 Representatives Of Contracting Officers 852.219-74 Limitations On Subcontracting Monitoring And Compliance (jul 2018) as Prescribed In 819.7203(a) Insert The Following Clause: (a) This Solicitation Includes 852.219-74, Va Notice Of Total Service-disabled Veteran-owned Small Business Set-aside, (b) Accordingly, Any Contract Resulting From This Solicitation Is Subject To The Limitation On Subcontracting Requirements In 13 Cfr 125.6. The Contractor Is Advised That In Performing Contract Administration Functions, The Contracting Officer May Use The Services Of A Support Contractor(s) Retained By Va To Assist In Assessing The Contractor S Compliance With The Limitations On Subcontracting Or Percentage Of Work Performance Requirements Specified In The Clause. To That End, The Support Contractor(s) May Require Access To Contractor S Offices Where The Contractor S Business Records Or Other Proprietary Data Are Retained And To Review Such Business Records Regarding The Contractor S Compliance With This Requirement. (c) All Support Contractors Conducting This Review On Behalf Of Va Will Be Required To Sign An Information Protection And Non-disclosure And Disclosure Of Conflicts Of Interest Agreement To Ensure The Contractor S Business Records Or Other Proprietary Data Reviewed Or Obtained In The Course Of Assisting The Contracting Officer In Assessing The Contractor For Compliance Are Protected To Ensure Information Or Data Is Not Improperly Disclosed Or Other Impropriety Occurs. (d) Furthermore, If Va Determines Any Services The Support Contractor(s) Will Perform In Assessing Compliance Are Advisory And Assistance Services As Defined In Far 2.101, Definitions, The Support Contractor(s) Must Also Enter Into An Agreement With The Contractor To Protect Proprietary Information As Required By Far 9.505-4, Obtaining Access To Proprietary Information, Paragraph (b). The Contractor Is Required To Cooperate Fully And Make Available Any Records As May Be Required To Enable The Contracting Officer To Assess The Contractor S Compliance With The Limitations On Subcontracting Or Percentage Of Work Performance Requirement. (end Of Clause) 852.219-77 Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction. as Prescribed In 819.7009(c) Insert The Following Clause: va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction (sep 2021) (deviation) (a) Pursuant To 38 U.s.c. 8127(k)(2), The Offeror Certifies That (1) If Awarded A Contract (see Far 2.101 Definition), It Will Comply With The Limitations On Subcontracting Requirement As Provided In The Solicitation And The Resultant Contract, As Follows: [contracting Officer Check The Appropriate Box Below Based On The Predominant Naics Code Assigned To The Instant Acquisition As Set Forth In Far 19.102.] (i) [x] Services. In The Case Of A Contract For Services (except Construction), The Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To It To Firms That Are Not Vip-listed Sdvosbs As Set Forth In 852.219-74 Or Vosbs As Set Forth In 852.219-11. Any Work That A Similarly Situated Vip-listed Subcontractor Further Subcontracts Will Count Towards The 50% Subcontract Amount That Cannot Be Exceeded. Other Direct Costs May Be Excluded To The Extent They Are Not The Principal Purpose Of The Acquisition And Small Business Concerns Do Not Provide The Service As Set Forth In 13 Cfr 125.6. (ii) [ ] General Construction. In The Case Of A Contract For General Construction, The Contractor Will Not Pay More Than 85% Of The Amount Paid By The Government To It To Firms That Are Not Vip-listed Sdvosbs As Set Forth In 852.219-74 Or Vosbs As Set Forth In 852.219-11. Any Work That A Similarly Situated Vip-listed Subcontractor Further Subcontracts Will Count Towards The 85% Subcontract Amount That Cannot Be Exceeded. Cost Of Materials Are Excluded And Not Considered To Be Subcontracted. (iii) Special Trade Construction Contractors. In The Case Of A Contract For Special Trade Contractors, The Contractor Will Not Pay More Than 75% Of The Amount Paid By The Government To It To Firms That Are Not Vip-listed Sdvosbs As Set Forth In 852.219-74 Or Vosbs As Set Forth In 852.219-11. Any Work That A Similarly Situated Subcontractor Further Subcontracts Will Count Towards The 75% Subcontract Amount That Cannot Be Exceeded. Cost Of Materials Are Excluded And Not Considered To Be Subcontracted. (2) The Offeror Acknowledges That This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States. The Offeror Further Acknowledges That This Certification Is Subject To Title 18, United States Code, Section 1001, And, As Such, A False, Fictitious, Or Fraudulent Certification May Render The Offeror Subject To Criminal, Civil, Or Administrative Penalties, Including Prosecution. (3) If Va Determines That An Sdvosb/vosb Awarded A Contract Pursuant To 38 U.s.c. 8127 Did Not Act In Good Faith, Such Sdvosb/vosb Shall Be Subject To Any Or All Of The Following: (i) Referral To The Va Suspension And Debarment Committee; (ii) A Fine Under Section 16(g)(1) Of The Small Business Act (15 U.s.c. 645(g)(1)); And (iii) Prosecution For Violating Section 1001 Of Title 18. (b) The Offeror Represents And Understands That By Submission Of Its Offer And Award Of A Contract It May Be Required To Provide Copies Of Documents Or Records To Va That Va May Review To Determine Whether The Offeror Complied With The Limitations On Subcontracting Requirement Specified In The Contract. The Contracting Officer May, At Their Discretion, Require The Contractor To Demonstrate Its Compliance With The Limitations On Subcontracting At Any Time During Performance And Upon Completion Of A Contract If The Information Regarding Such Compliance Is Not Already Available To The Contracting Officer. Evidence Of Compliance Includes, But Is Not Limited To, Invoices, Copies Of Subcontracts, Or A List Of The Value Of Tasks Performed. (c) The Offeror Further Agrees To Cooperate Fully And Make Available Any Documents Or Records As May Be Required To Enable Va To Determine Compliance With The Limitations On Subcontracting Requirement. The Offeror Understands That Failure To Provide Documents As Requested By Va May Result In Remedial Action As The Government Deems Appropriate. (d) Offeror Completed Certification/fill-in Required. The Formal Certification Must Be Completed, Signed, And Returned With The Offeror S Bid, Quotation, Or Proposal. The Government Will Not Consider Offers For Award From Offerors That Do Not Provide The Certification, And All Such Responses Will Be Deemed Ineligible For Evaluation And Award. i Hereby Certify That If Awarded The Contract, [insert Name Of Offeror] Will Comply With The Limitations On Subcontracting Specified In This Clause And In The Resultant Contract. I Further Certify That I Am Authorized To Execute This Certification On Behalf Of [insert Name Of Offeror]. printed Name Of Signee: _________________________________ printed Title Of Signee: ________________________________ signature: ______________________________________________ date: ___________________________________________________ company Name And Address: _____________________________________________________________________________________ (end Of Clause) 852.242-71 Administrative Contracting Officer. as Prescribed In 842.271, Insert The Following Clause: administrative Contracting Officer (oct 2020) the Contracting Officer Reserves The Right To Designate An Administrative Contracting Officer (aco) For The Purpose Of Performing Certain Tasks/duties In The Administration Of The Contract. Such Designation Will Be In Writing Through An Aco Letter Of Delegation And Will Identify The Responsibilities And Limitations Of The Aco. A Copy Of The Aco Letter Of Delegation Shall Be Furnished To The Contractor. (end Of Clause) (xii) Clause At 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders -- Commercial Items, Applies To This Acquisition And In Addition To The Following Far Clauses Cited, Which Are Also Applicable To The Acquisition: 52.203-6, 52.204-10, 52.209-6, 52.219-4, 52.219-8, 52.219-6, 52.219-28, 52.222-3, 52.222-21, 52.222-26, 52.222-35, 52.222-36, 52.222-37, 52.222-40, 52.222-50, 52.223-18, 52.225-3, 52.225-13, 52.232-33, 52.222-41 (wage Determination Newington Vamc Wd 2015-4119 (rev-26) And West Haven Vamc Wd 2015 4127 (rev-26), 52.222-42, 52.222-43, 52.222-55, 52.222-62 (xiii) All Contract Requirement(s) And/or Terms And Conditions Are Stated Above. (xiv) The Defense Priorities And Allocations System (dpas) And Assigned Rating Are Not Applicable To This Requirement. (xv) Rfq Responses Are Due Nlt 07/05/2024 At 17:00 Pm Est. Rfq Responses Must Be Submitted Via Email With Rfq #36c24124q0673 In The Subject Line To: Nathan.langone@va.gov Hand Deliveries Shall Not Be Accepted. (xvi) The Poc Of This Solicitation Is Nathan Langone (nathan.langone@va.gov)

MUNICIPALITY OF CAJIDIOCAN, ROMBLON Tender

Philippines
Closing Date6 Sep 2024
Tender AmountPHP 1.8 Million (USD 32 K)
Details: Description Itb No. 2024-069 Republic Of The Philippines Province Of Romblon Municipality Of Cajidiocan Invitation To Bid For Office Supplies -lgu- Lgu, Cajidiocan, Romblon 1. The Municipal Government Of Cajidiocan, Romblon Intends To Apply The Sum Of One Million Eight Hundred Two Thousand Three Hundred Thirty-six And 52/100 (php 1,802, 336.52 ) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Purchase Of Goods Office Supplies -lgu – Lgu, Cajidiocan, Romblon. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Bid Opening. 2. The Municipal Government Of Cajidiocan, Romblon Now Invites Bid For The Goods Only. Bidders Must Have Completed, Within The Period Specified In The Invitation To Bid, A Single Contract Similar To The Contract To Be Bid. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly In Section Ii, Instruction To Bidders. 3. Bidding Will Be Conducted Through An Open Competitive Bidding Procedures Using A Non- Discretionary ‘pass/fail’ Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act. Bidding Is Restricted To Filipino Citizens/sole Proprietorship, Partnerships Or Organizations With At Least Sixty (60%) Interest Or Outstanding Capital Stocks Belonging To Citizens Of The Philippines, And To Citizens, Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. 4. Interested Bidders May Obtain Further Information From The Municipal Government Of Cajidiocan, Romblon And Inspect The Bidding Documents At The Address Given Below During Office Hours, 8.00 A.m. To 5.00 P.m. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of Non- Refundable Fee For Bidding Documents Pursuant To The Latest Guidelines Issued By The Gpbb, In The Amount Of Five Thousand Pesos Only (p 5,000.00) 5. Bids Must Be Delivered To The Address Below On Or Before September 06, 2024 – 9:00 A.m. At The Municipal Engineer Office. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount As Stated In Itb Clause. Pre Bid Conference Is On August 23, 2024- 9:00 Am. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Accepted 6. The Municipal Government Of Cajidiocan, Romblon Reserves The Right To Accept Or Reject Any Bid, To Annual The Bidding Process And To Reject All Bids At Any Time Prior To The Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 7. For Further Information, Please Contact/refer: Municipal Engineer/ Bac Chairman, Engr. Christopher M. Rizo Or Bac Secretariat Arc. Kathleen M. Rabino Lgu- Cajidiocan, Romblon Signed Engr. Christopher M. Rizo Bac Chairman Date Of Posting: August 15, 2024 Item No. Office Supplies Unit Qty Batteries And Bulbs 1 Battery "aa" Energizer Pc/s 120 2 Battery "aaa" Energizer Pc/s 82 3 Rechargeable Battery "aaa" Energizer Pc/s 30 4 Rechargeable Battery "aa" Energizer Pc/s 30 5 Energizer Battery D Pc/s 12 6 Energizer Battery Charger Pc/s 2 7 Led Bulb - 15 Watts Pc/s 14 8 Led Bulb - 18 Watts Pc/s 6 9 Led Bulb - 22 Watts Pc/s 2 10 Led Bulb - 30 Watts Philips Pc/s 2 11 Led Bulb - 60 Watts - White Pc/s 4 12 Led Searchlight + Table Lamp / Nxled, Rechargeable / 24 Led / 220-240 Up To 8 Hrs. Pc/s 6 13 Solar Lights With Panel Outdoor 80 Watts Pc/s 1 14 Emergency Lamp Light Pc/s 1 Binders And Clips 15 Binder Clip - 1 1/4 (32mm) Box 36 16 Binder Clip - 1 3/4 (42mm) Box 3 17 Binder Clip - 2" (50mm) Box 23 18 Binder Clip - 1" (24mm) Box 30 19 Binder Clip - 3/4" (20mm) Box 7 20 Bulldog Clip / 2" / Metal / 12 Pcs Per Box Box 36 21 Bulldog Clip / 3" / Metal / 12 Pcs Per Box Box 24 22 Fastener - Plastic Coat Box 79 23 Glue - (473ml) Bottle 4 24 Glue - (240ml) Bottle 11 25 Glue - (130 Ml) Bottle 128 26 Paper Clip - Vinyl-coated, 33mm Box 231 27 Paper Clip - Plastic-coated, 48mm Min (jumbo/big) Box 184 28 Puncher - Heavy Duty With Two Hole Guide Pc/s 8 29 Push Pin (100 Pc/box) Box 7 30 Shoe Lace, Black, 24" Box 50 31 Staple Wire #35 Box 75 32 Staple Wire #10 Box 20 33 Stapler (max Brand) With Staple Wire Remover #35 Pc/s 28 34 Stapler Heavy Duty 120-160 Pages Capacity Pc/s 1 35 Stapler (max ) Hd #10 Pc/s 5 36 Rubber Band High Quality Big - 350 Grams Box 17 37 Rubber Band #16 50 Grams Flat Box 5 38 Rubber Band High Quality Big - Elongated Box 1 Calculator 39 Calculator - Compact - 12digits -two Way Power Unit 8 40 Calculator - Casio - (mx-12b) Pc/s 21 Cleaning, Disinfectant Supplies, Safety & Health Care & Other Essential Supplies 41 Albatros (toilet Deodorant) Pc/s 6 42 Glade Scented Gel Pc/s 15 43 Air Freshener -lemon 500ml Bottle 16 44 Air Freshener 320ml Bottle 60 45 Air Freshener 320ml Lavender Vanilla Bottle 6 46 Air Freshener 320ml Lemon Bottle 6 47 Alcohol - Green Cross Isoprophyl / Pump Alcohol With Moisturizer (500ml) Bottle 24 48 Alcohol - Green Cross Isoprophyl / Pump Alcohol With Moisturizer (1000ml) Bottle 20 49 Alcohol - 70% Ethyl With Mositurizer (500ml) Bottle 199 50 Alcohol - 70% Isoprophyl (500ml) Bottle 105 51 Alcohol - 70% Isoprophyl (gal) Gal 3 52 Alcohol - 70% Isoprophyl Spary 330ml. Bottle 32 53 Baygon Insect Spray 500g -triple Action Bottle 11 54 Baygon Insect Spray 500ml Odorless Bottle 39 55 Bleach - Liquid 1000ml Bottle 6 56 Broom - Walis Tambo Pc/s 25 57 Broom - Walis Tingting (idioc) Pc/s 18 58 Detergent Powder Doz 4 59 Liquid Detergent/liter/ariel Bottle/s 5 60 Detergent Powder Tide Pc/s 224 61 Detergent Powder Ariel Twin Pack Pc/s 24 62 Dishwashing Liquid 250ml Bottle 91 63 Dishwashing Liquid 475ml Bottle 90 64 Smart Dishwashing Paste Lemon 200g Pc/s 10 65 Zip Dishwashing Liquid Gal 6 66 Disinfectant Spray - Aerosol Type (500ml) Can/bottle 19 67 Disinfectant Spray "lysol" (500 Gms) Crisp Linen Scent Bottle 4 68 Doormat - Rubberize/ Anti-slip/ Rug Pine Pc/s 10 69 Doormat - Rag Pc/s 6 70 Dust Pan Pc/s 19 71 Floor Mop (tornado With Drainer) - Heavy Duty Set 13 72 Liquid Hand Soap /500ml Safeguard Bottle 10 73 Liquid Hand Soap /450ml Safeguard, Lemon Fresh Bottle 27 74 Hand Soap W/ Moisturizer /250ml Bottle 35 75 Soap / Safeguard Pc/s 12 76 Hand Sanitizing Gel 60ml. Bottle 12 77 Hand Sanitizing Gel 250ml. Bottle 24 78 Interfolded Paper Towel 220mmx210mm Packs 686 79 Dipper Packs 6 80 Scotch-brite With Foam - Heavy Duty Pc/s 71 81 Scotch-brite Scrubbing Pad Pc/s 24 82 3m Scoth Scotch Brite Dual Blade Squeegee (window Wiper) Pc/s 8 83 Tissue Paper - 2 Ply - Good Quality Roll 909 84 Toilet Bowl Cleaner 500 Ml / Mr. Muscle Bottle 15 85 Toilet Bowl Cleaner 500 Ml / Tuff Bottle 10 86 Toilet Bowl Cleaner 500 Ml / Domex Bottle 12 87 Toilet Bowl Cleaner 900ml / Domex Bottle 52 88 Computer Keyboard Cleaning Gel Pc/s 6 89 Computer Keyboard W/ Light Usb Type Pc/s 2 90 Trash Bag -plastic (black) - Small 18" X 18", 25pcs/roll Roll 14 91 Biodegradable Trash Bag (black) - Medium (11x11x24") 50pcs/roll Roll 16 92 Biodegradable Trash Bag (black) - Xl (15x15x37") 100pcs/roll Roll 28 93 Wipes 80pcs./pack Pack 20 94 Microfiber Towel (good Quality) Pc/s 15 95 Trash Bin 25 Ltrs. W/ Cover Pc/s 13 96 Garbage Bin Large Pc/s 12 97 Toilet Brush Scotch W/ Handle And Holder Pc/s 8 98 Toilet Brush W/ Long Handle & Holder Pc/s 2 99 Zonrox, Original 1000ml Bottle 59 100 Zonrox, Lemon / Floral Scent 1000ml Bottle 68 101 Zonrox, Lemon / Floral Scent 1000ml Gal 4 102 Zonrox, Colorsafe 1000ml Bottle 48 Computer Ink 103 Original Genuine Epson Td4d1 Maintenance Box For Epson L6270 Pc/s 2 104 Hp 678 - Colored - Ink Cartridge Bottle 6 105 Hp 678 - Black - Ink Cartridge Bottle 12 106 Hp Deskjet Ink/black #61 Bottle 12 107 Epson Ink #001 -65ml - Black Bottle 5 108 Epson Ink #001 -65ml - Cyan Bottle 3 109 Epson Ink #001 -65ml - Magenta Bottle 3 110 Epson Ink #001 -65ml - Yellow Bottle 3 111 Epson Ink #003 -65ml - Black Bottle 160 112 Epson Ink #003 - 65ml - Cyan Bottle 89 113 Epson Ink #003 - 65ml - Magenta Bottle 87 114 Epson Ink #003 - 65ml - Yellow Bottle 90 115 Epson Ink T6641 / Black 70ml. Bottle 31 116 Epson Ink T6642 /cyan 70ml. Bottle 1 117 Epson Ink T6643 /magenta 70ml. Bottle 1 118 Epson Ink T6644 /yellow 70ml. Bottle 1 119 Epson Ink #673 / Black Bottle 5 120 Epson Ink #673 / Cyan Bottle 3 121 Epson Ink #673 / Magenta Bottle 3 122 Epson Ink #673 / Light Cyan Bottle 3 123 Epson Ink #673 / Light Magenta Bottle 3 124 Epson Ink #673 / Yellow Bottle 3 125 Epson Ink #664 / Black Bottle 17 126 Epson Ink #664 /cyan Bottle 5 127 Epson Ink #664 /magenta Bottle 5 128 Epson Ink #664 /yellow Bottle 5 129 Ribbon Cartridge - Epson Lq310 Bottle 24 130 Toner Ink (kyocera) Tk 7120 Pc/s 1 131 Toner Ink (kyocera) Tk 4109 Pc/s 2 132 Toner Ink (kyocera) Tk 4041 Pc/s 6 133 Toner Kit (kyocera) Tk 4140 Pc/s 3 134 Toner Ink (kyocera) Ecosys-m6030cdn-black Pc/s 1 135 Toner Ink (kyocera) Ecosys-m6030cdn-cyan Pc/s 1 136 Toner Ink (kyocera) Ecosys-m6030cdn-magenta Pc/s 1 137 Toner Ink (kyocera) Ecosys-m6030cdn-yellow Pc/s 1 138 Epson Ink #005bk 120ml. Bottle 6 139 Brother Ink - Cyan (bt5000c) Bottle 13 140 Brother Ink - Magenta (bt5000m) Bottle 13 141 Brother Ink - Yellow (bt5000y) Bottle 13 142 Brother Ink - Black (btd608k) Bottle 3 143 Fuji Xerox Toner Cartridge Ct 202873 Bottle 2 144 Ink Cartidge (cannon Pg88 Black) Bottle 15 145 Ink Cartidge (cannon Pg98 Black) Bottle 12 Curtains And Towels 146 Blaockout Curtain (red) Pc/s 12 147 Blaockout Curtain Set (olive Green) 9ft Pc/s 2 148 Curtain Rod Expandable 1/2 Inch X 3m Pc/s 3 149 Curtain W/ Ring, 8ft. Pc/s 10 150 Curtain Plain 3mtrs Long Pc/s 10 151 Curtain Plain Good Quality - Red Pc/s 6 152 Curtain, 96 Inches, Silk Satin, Mocha, Good Quality Pc/s 15 Filling And Storage 153 Envelope /brown / Legal/ Documentary Pc/s 1,274 154 Envelope /brown / A4/ Documentary Pc/s 350 155 Envelope /brown / Short / Documentary Pc/s 324 156 Mail Envelope White Long Pc/s 550 157 Expandable Folder - Legal/ Yellow Pack 25 158 Expandable Envelope/ Legal/ Brown Pc/s 310 159 Expandable Envelope/ Legal/ Assorted Color Pc/s 84 160 File System - 125mmx230mmx400mm Pc/s 10 161 Folder/paper/legal/white Pc/s 1,158 162 Folder/paper/short/white Pc/s 310 163 Folder/plastic/colored/long/violet Pc/s 25 164 Folder/plastic/colored/long/pink Pc/s 25 165 Folder/plastic/colored/long/green Pc/s 25 166 Folder/plastic/colored/long/peach Pc/s 25 167 Expandable Folder / Long / Green Pc/s 80 168 Lever Arch File Folder With Ring/ring Binder "legal/long"/ Vertical Pc/s 10 169 Document Horizontal File Arch Pc/s 26 170 Document Box Pc/s 20 171 Pvc File Folder Pc/s 20 172 Magazine File Box Vertical Holder Pc/s 10 173 3 Layer Metal Document Tray - Black Pc/s 3 174 Plastic Envelope /legal/ Expandable/ With Handle Pc/s 6 175 Plastic Envelope /legal Pc/s 32 176 Adventurer Transparent Envelop, Legal White Pc/s 100 177 Adventurer Transparent Envelop, Short White Pc/s 50 178 Storage Box, 50 Liters Pc/s 3 179 Clear Book / Legal Size / Assorted Color Pc/s 50 180 Clear Book Refill/ Legal Size / 20 Pcs/pack Pack/s 20 181 Pay Envelope (50's) 8"-1/2 X 4" Pc/s 1,500 182 Certificate Holder A4 Pc/s 75 Measuring Tools 183 Tape Measure Pc/s 12 184 Long Tape Fiberglass 50/165' X 1/2 Pc/s 1 185 Tape Measure 7.5m/ 25' Pc/s 2 186 Ruler - Plastic (12") Pc/s 16 Paper Cutter And Scissors 187 Cutter Blade Pc/s 5 188 Cutter Knife 7 Inches Pc/s 2 189 Cutter Blade Refill Pack Pc/s 16 190 Paper Cutter Size A4 K-w-trio Pc/s 1 191 Scissors (big) Good Quality Pc/s 35 192 Automatic Paper Shredder Machine Unit 1 Pens,pencils And Erasers 193 Ballpen/black (0.5) Pc/s 579 194 Ballpen/red (0.5) Pc/s 37 195 Ballpen/blue (0.5) Pc/s 20 196 Ballpen/flexstick 0.5 / Fo-gelb08/black Pc/s 150 197 Ballpen/flexstick 0.5 / Fo-gelb08/blue Pc/s 50 198 Ballpen/flexstick 0.5 / Fo-gelb08/red Pc/s 50 199 Pilot Bp-s Fine Ballpoint Pen Black Pc/s 75 200 Flexstick Neo Smooth Ink Pen, 0.7 Pc/s 200 201 Correction Tape - Good Quality - White Pc/s 327 202 Stam Pad Pc/s 2 203 Stam Pad Ink - Refill Black Bottle 3 204 Stam Pad Ink - Refill Blue Bottle 1 205 Stam Pad #2 / Hbw / Ink Blue Bottle 4 206 Highlighter Pen Pc/s 30 207 Highlighter Pen /yellow Green Pc/s 57 208 Highlighter Pen /orange Pc/s 27 209 Highlighter Pen /green Pc/s 21 210 Liquid Gel Pen Black (0.5) Box 39 211 Liquid Gel Pen Black (0.5) Pc/s 86 212 Liquid Gel Pen Blue (0.5) Pc/s 12 213 Liquid Gel Pen Red (0.5) Pc/s 12 214 Liquid Gel Pen Red (0.4) Pc/s 20 215 Paper Eraser Pc/s 30 216 Eraser, Dust Free Faber-castell Pc/s 12 217 Sharpener Heavy Duty Pc/s 1 218 Pencil/mongol/yellow No. 2 Box 18 219 Pencil/mongol/yellow No. 1 Pc/s 38 220 Pencil/mongol/yellow No. 2 Pc/s 96 221 Pentel Pen (pilot - Broad) - Black Pc/s 140 222 Pentel Pen (pilot - Fine) - Black Pc/s 63 223 Sign Pen / Black 0.5 Pc/s 272 224 Sign Pen / Blue 0.5 Pc/s 31 225 Sign Pen / Red 0.5 Pc/s 5 226 Sign Pen / Black 0.7 Pc/s 25 227 White Board Marker (black) Pc/s 24 228 Pentel Pen Ink Black Bot. 3 229 Pen Holder - Wooden Pc/s 2 Ppe 230 Face Mask (disposable/surgical) 3ply Box 25 231 Disposable Garden Gloves W/ Claw - Good Quality Pair 50 Tapes And Adhesives 232 Masking Tape - 1 Inch Pc/s 38 233 Masking Tape - 2 Inches Pc/s 68 234 Mounting Tape - 1 Inch Pc/s 53 235 Scotch Tape - 1 Inch Pc/s 74 236 Scotch Tape - 2 Inches Pc/s 96 237 Packaging Tape - 2 Inches Pc/s 104 238 Packaging Tape - 2 Inches - Brown Pc/s 8 239 Tape Dispenser, Table Top For 1" Pc/s 5 240 Tape, Clear - 1 Inch/24mm Pc/s 18 241 Tape, Double Sided Adhesive - 1 Inch Pc/s 121 242 Tape, Double Adhesive - 24mm X 10m Pc/s 36 243 Electrical Tape Pc/s 11 244 Twine Kg 1 245 Duct Tape 2" Pc/s 6 Utensils 246 Stainless Steel Spoons Doz 2 247 Stainless Steel Fork Doz 2 248 Rice Cooker 1.5l Pc/s 2 249 Rice Cooker 15 Cups Imarflex Pc/s 1 250 Rice Cooker W/ Steamer 1.8l Pc 2 251 Tefal Non-stick Casserole, 4l Pc/s 1 252 Tefal Non-stick Frying Fan, 11 Inches Pc/s 1 Writing Pads 253 Bond Paper, Substance 20/70g-legal Ream 340 254 Bond Paper, Substance 20/70g-long Ream 193 255 Bond Paper, Substance 20/70g-short Ream 109 256 Bond Paper, Substance 20/70g- A4 Ream 377 257 Bond Paper, Substance 20/70g- A3 Ream 3 258 Colored Paper Long Ream 2 259 Cartolina Assorted Pc/s 80 260 Cartolina Red Pc/s 15 261 Cartolina Yellow Green Pc/s 20 262 Columnar Book (24 Columns) Pc 8 263 Columnar Book (14 Columns) Pc 4 264 Journal (2 Columns) Pc 2 265 Index Card 4x6 (100's Pack) Pack 30 266 Notebook (basic + Note) Lb560-05 252mm X 179mm Pc/s 6 267 Notebook Spring Flip Up Loose Leaf Book / Vertical Type Pc/s 10 268 Note Pad, Stick On, 3"x3" Pad 12 269 Photopaper A4 20s' 260gsm Pack 4 270 Record Book - 500 Pages Pad 6 271 Record Book - 300 Pages Pad 22 272 Vellum 10 Sheets Specialty Board 200 Gsm, 8.5 X 13" / White Pack 60 273 Vellum 10 Sheets Specialty Board 200 Gsm, A4 / White Pack 16 274 Cork Board W/ Frame 3 Ft. X 4 Ft. Pc/s 2 275 Yellow Pad Pad 53 276 Dtr (csf No. 48) Pads 10 277 Loose Leaf Cover, Made Of Chip Board, For Legal Pc/s 100 278 Neon Paper Pc/s 100 Others 279 Grinder And Drill Set Set 1 280 Stanley 10 Pcs Starter Tool Set Set 1 281 Grass Cutter, Honda 4 Stroke Pc/s 1 282 Concrete Buggy Pc/s 3 283 Hedge Shears, Heavy Duty Pc/s 7 284 Rain Coat, Jacket And Pants (titanium Rubberized) Pc/s 20 285 Fh-7500 High Mesh Executive Chair Pc/s 1 286 Wall Clock (aa Bat.) Pc/s 1 287 Body Mirror Pc/s 1 288 Wifi Usb Connector Pc/s 2 289 Wired Keyboard / Soft Touch / Waterproof Pc/s 3 290 Optical Mouse Pc/s 5 291 Wireless Computer Mouse / High Quality Pc/s 3 292 Epson L3210 / All In One Ink Tank Printer Pc/s 4 293 Mouse Pad Pc/s 5 294 Ups 1000 Or Up Va / High Quality Pc/s 6 295 Ups / Back Up, 650 Va/390w Pc/s 3 296 Flash Drive - 2tb 4 In 1 Usb 3.0 Otg Pen Drive Pc/s 1 297 Flash Drive - 32gb Pc/s 22 298 Flash Drive - 64gb Pc/s 2 299 Flash Drive - 128gb Kingstone Pc/s 3 300 Flash Drive - 4tb Seagate Pc/s 1 301 External Hard Drive 1tb - Wd / Usb 3.0 Pc/s 2 302 Power Delay / Higher Kva Ups Range / 2kva- 12kva / Float Charging Voltage 13.7v ± 0.2 V / Battery (12v Dc Of Each Battery. / Input Voltage Range ± 10v 90v To 300v 100v To 280v Pc/s 2 303 Cpu Unit Only / Amd Ryzen 5 4650g / 3.7ghz / 6core/ 12th / Am4/ Original Fan / Asrock B550m Pro4 Motherboard / Kingston Ddr4 3200mhz Non Rgb / Pny Nvme M.2 256gb / 500w Psu Thru Rated Psu / Avr Secure 500 / Windows 10/11 Pro. Unit 1 304 Printer / Scanner Coppier (colored) 3-n-1 Unit 1 305 Portable Projector Screen 120"x100" W/ Stand And Bag Set 1 306 Christmas Lights Set 1 307 Christmas Décor & Lights Set 1 308 Wired Microphone (10 Meters Long Cable) Pc/s 2 309 Adult Wheelchair (for Office) Pc/s 1 310 Purified Water Container 100 311 Dish Organizer Set 1 312 Water Dispenser/ Top Buttons/ Hot, Cold And Warm Option/ Good Quality Pc/s 1 313 Foldable Desk/table, Multi Purpose, Length - 100cm, Width-50cm, Height-75cm Pc/s 2 314 Rotary Chair / Office Chair, With Headrest Pc/s 4 315 Monoblock Chair Pc/s 5 316 Ceiling Fan - Asahi Home Appliances Pc/s 2 317 Electric Fan - F459 Lp Dc Pc/s 1 318 Exhaust Fan 8" Riversable Pc/s 1 319 Exhaust Fan 12" Riversable Pc/s 1 320 Money Detector / Good Quality Pc/s 1 321 Tricycle Plates (series 751-801) Pc/s 50 322 Bill Counter / Cash Counter / High Quality Pc/s 1 323 Plastic Stool 201 Uratex / Marble Beige / Marble White Pc/s 2 324 Vaccum Cleaner (portable) Pc/s 1 325 Vaccum Cleaner - Heavy Duty Pc/s 1 326 Extension Cord, Wheel Type 15 Mtrs. Pc/s 4 327 Extension Cord, Wheel Type 15 Mtrs. - 5 Socket Pc/s 1 328 Steel Cabinet W/ Sliding Glass Door Pc/s 3 329 Door Knob Pc/s 2 330 Exterior Tire - 300"x18" Pc/s 1 331 Interior Tire - 300"x18" Pc/s 1 332 Sprocket Pc/s 1 333 Engine Sprocket - Supremo Pc/s 1 334 Motorcycle Chain Set 1 335 Castrol Oil (oil 40) Ltr. 6

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Consultancy Services
United States
Closing Date15 Apr 2024
Tender AmountRefer Documents 
Details: This Is A Sources Sought Notice Only. This Is Not A Request For Quotes And No Contract Will Be Awarded From This Announcement. The Government Will Not Provide Any Reimbursement For Responses Submitted In Response To This Source Sought Notice. Respondents Will Not Be Notified Of The Results Of The Evaluation. if A Solicitation Is Issued It Shall Be Announced At A Later Date, And All Interest Parties Must Respond To That Solicitation Announcement Separately. Responses To This Notice Are Not A Request To Be Added To A Prospective Bidders List Or To Receive A Copy Of The Solicitation. the Purpose Of This Announcement Is To Perform Market Research To Gain Knowledge Of Potential Qualified Sources And Their Size Classification Relative To Naics 238220, (j045) With A Size Standard $19m. The Department Of Veterans Affairs (va), Network Contracting Office 1 (nco 1) Is Seeking To Identify Any Vendor Capable Of Providing Plumbing And Pipefitting Services Per The Statement Of Workâ below. this Sources Sought Notice Provides An Opportunity For Respondents To Submit Their Capability And Availability To Provide The Requirement Described Below. Vendors Are Encouraged To Submit Information Relative To Their Capabilities To Fulfill This Requirement, In The Form Of A Statement That Addresses The Specific Requirement Identified In This Sources Sought. Information Received From This Sources Sought Shall Be Utilized To Facilitate The Contracting Officer S Review Of The Market Base, For Acquisition Planning, Size Determination, And Procurement Strategy. submission Instructions: Interested Parties Who Consider Themselves Qualified To Perform The Services Are Invited To Submit A Response To This Sources Sought Notice By 5pm Est, Monday, April 15, 2024. All Responses Under This Sources Sought Notice Must Be Emailed To Rosangela.pereira@va.gov With Rfq # 36c24124q0326 In The Subject Line. Telephone Inquiries Will Not Be Accepted Or Acknowledged, And No Feedback Or Evaluations Will Be Provided To Companies Regarding Their Submissions. interested Parties Should Complete The Attached Sources Sought Worksheet. Parties May Submit Additional Information Related To Their Capabilities, Provided It Contains All The Requirements Contained In The Sources Sought Worksheet. Responses To This Sources Sought Shall Not Exceed 8 Pages. In Addition, All Submissions Should Be Provided Electronically In A Microsoft Word Or Adobe Pdf Format. attachment 1 sources Sought Worksheet qualification Information: company / Institute Name: _______________________________________________________ address: ______________________________________________________________________ phone Number: ________________________________________________________________ point Of Contact: _______________________________________________________________ e-mail Address: ________________________________________________________________ unique Entity Identifier (uei) #:â ___________________________________________________ cage Code: __________________________________________________________________ sam Registered: (y / N) other Available Contract Vehicles Applicable To This Sources Sought (gsa/fss/nasa Sewp/etc): __________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ socio-economic Status: vip Verified Sdvosb: (y / N) vip Verified Vosb: (y / N) 8(a): (y / N) hubzone: (y / N) economically Disadvantaged Women-owned Small Business: (y / N) women-owned Small Business: (y / N) small Business: (y / N) note: Respondent Claiming Sdvosb And Vosb Status Shall Be Registered And Center For Veterans Enterprise (cve) Verified In Vetbiz Registry Www.vetbiz.gov. based On The Responses To This Sources Sought Notice/market Research, This Requirement May Be Set-aside For Sdvosb, Vosb, Small Businesses Or Procured Through Full And Open Competition. capability Statement: provide A Brief Capability And Interest In Providing The Service As Listed In Attachment 2 Statement Of Work With Enough Information To Determine If Your Company Can Meet The Requirement. The Capabilities Statement For This Sources Sought Is Not A Request For Quotation, Request For Proposal, Or Invitation For Bid, Nor Does It Restrict The Government To An Ultimate Acquisition Approach, But Rather The Government Is Requesting A Short Statement Regarding The Company S Ability To Provide The Services Outlined In The Sow. Any Commercial Brochures Or Currently Existing Marketing Material May Also Be Submitted With The Capabilities Statement. This Synopsis Is For Information And Planning Purposes Only And Is Not To Be Construed As A Commitment By The Government. The Government Will Not Pay For Information Solicited. Respondents Will Not Be Notified Of The Results Of The Evaluation. _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ attachment 2 statement Of Work plumbing And Pipefitting provide All Labor, Transportation, Materials, Apparatus, Tools, Equipment And Permits Necessary For The Following Work. The General Limit Of The Specified Work Area Will Be Located At The Vamc, 830 Chalkstone Ave., Providence, Ri 02908 And Other Properties Either Owned Or Leased By The Vamc. The Work Will Entail The Miscellaneous Electrical Maintenance, Repair And Installation Projects As Well 24-hour Electrical Emergency Service Call Response. place Of Performance department Of Veterans Affairs vamc Providence 830 Chalkstone Avenue providence, Ri, 02908 period Of Performance five (5) Years From Date Of Issuance. a. Pipefitter Maintenance, Repair, Installation & Fabrication Projects the Contractor Will Be Tasked To Do The Following Types Of Pipefitting Work: install And Repair High, Medium And Low Pressure Steam Systems. Install, Repair And Test Fire Sprinkler Systems. Install And Repair Domestic Hot/cold Water Systems. Install And Repair Hot Water Boilers And The Associated Hot Water Distribution Systems. Install And Repair Sanitary And Storm Water Sewer Systems. Install And Repair Sinks, Toilets, Faucets And The Related Domestic Water System Piping & Valves. Install And Repair Medical And Natural Gas Systems. Repair Pipe And Valve Insulation That Is Damaged During The Course Of A Repair Project. Provide Miscellaneous Metal Fabrication And Repair Projects. Parts May Be Purchased By The Va. emergency & Repair Service Work the Contractor Will Be Required To Provide 24/7 Response To Pipefitting, Water System, Fire Sprinkler System, Steam System, Medical And Natural Gas System Piping Problems. Response Time Will Be With-in 2 Hours Time Frame. qualifications the Contractor Must Be A Licensed Plumber & Pipefitter In The State Of Rhode Island And Massachusetts. The Contractor Must Provide A Copy Of Their License To Be Considered For Award. the Contractor Must Be Licensed To Install And Repair Fire Sprinkler Systems In The State Of Rhode Island And Massachusetts. Tthe Contractor Must Provide A Copy Of Their License To Be Considered For Award. the Contractor Must Be An A.s.m.e. Certified Welder. The Contractor Must Provide A Copy Of Their License To Be Considered For Award. the Contractor Must Have A Minimum Of 5 Years Experience Working In The Hospital Environment. b. Infection Control contractor Shall Conform To The Infection Control Measures As Specified In Attachment A. Infection Control Procedures c. Work Hours And Project Sequence routine Project Work Can Start As Early As 7:00 Am And Work Past 4:30pm Week Days. Weekend Work Needs To Be Approved By The Fms Supervisor. If The Contractor Desires To Work During Periods Other Than Above, He Must Notify The Contracting Officer Three (3) Working Days In Advance Of His Desire To Work During Other Periods To Allow Determination Of Availability Of Additional Inspection Forces, Determination Of Impact On Existing Health Care And Facility Operations, And For Notification Of Fire, Security And Safety Personnel. When The Contracting Officer Determines That There Are No Adverse Impacts To Health Care And Facility Operations And That Inspection Forces Are Reasonably Available, He/she May Authorize The Contractor To Perform Work During Periods Other Than Normal Duty Hours/days. However, If Inspectors Are Required To Perform In Excess Of Their Normal Duty Hours/days Solely For The Benefit Of The Contractor, The Actual Cost Of The Inspection, At Overtime Rates, Will Be Charged To The Contractor And Will Be Deducted From The Final Payment Of The Contract Amount. (note: If Applicable, At Time Of Award This Paragraph Will Be Modified To The Negotiated Schedule For This Project). Work In The Operating Room Suite Shall Be Performed Outside Normal Work Hours. Other Critical Care Areas May Also Require Work To Be Done Outside The Normal Work Hours. These Critical Care Areas Include The Intensive Care Unit, The Emergency Room, Specialty Clinics And Exam Rooms. emergency Service Work Will Occur As Conditions Dictate. The Following Federal Legal Holidays Are Observed: date holiday january 01 new Year S Day third Monday Of January birthday Of Martin Luther King, Jr. third Monday Of February washington S Birthday last Monday Of May memorial Day june 19 juneteenth National Independence Day july 04 independence Day first Monday In September labor Day second Monday In October columbus Day november 11 veterans Day fourth Thursday In November thanksgiving Day december 25 christmas Day note: Any Of The Above Holidays Falling On A Saturday Will Be Observed The Preceding Friday, Holidays Falling On A Sunday Will Be Observed On The Following Monday. prior To Commencing Work On The Job Initially, Resumption Of Work After Prolonged Interruption (7 Calendar Days Or More), Commencement Of Any Warranty Work, And Upon Completion Of Warranty Work, The Contractor Must Notify The Contracting Officer (or His/her Contracting Officer S Representative). When Relocating To New Sites, Returning To Sites For Follow-up Work On A Phased Work Plan, Notification To The Contracting Officer S Representative Is Sufficient. Notification Should Be By Personal Contact; However, Advance Notification May Be By Telephone, Or In Writing, And Should Be Accomplished Sufficiently In Advance To Allow Scheduling Of Inspection Forces. The Purpose Of The Above Precautions Is To Ensure Construction Inspection And Recording Of Work Proceedings. d. Ordering individual Task Orders (to) Will Be Issued On An As Needed Basis During The Period Of Performance Specified. The Tos Will Be Issued Based On Proposals From The Contractor That Are Developed From Scopes Of Work Provided By The Pvamc Cor. any Services To Be Furnished Under This Contract Will Be Ordered By Issuance Of Tos By The Individuals Or Activities Designated In This Contract. Any Federal Contracting Officer, At The Locations Specified In The Solicitation, Or As Approved In Writing By The Issuing Office Contracting Officer, Is Authorized To Issue Orders Under The Bpa Contract Within The Individual S Warrant Levels. orders May Be Issued From Date Of Contract Award Until The Last Day Of The Bpa Period Of Performance. The Government Reserves The Right To Unilaterally Modify The Contract To Incorporate Any Future Statutory Changes. all Tos Are Subject To The Terms And Conditions Of This Contract. In The Event Of Conflict Between A To And This Contract, The Contract Will Govern. The Government Reserves The Right To Incorporate Additional Clauses, As Appropriate, Into Individual To Solicitations And Awards. e. Task Order Limitations minimum Order: When The Government Requires Services Covered By This Contract In An Amount Less Than $2,500 The Government Will Issue A Credit Card Purchase Order And Not A Task Order. maximum Order: The Typical Maximum Task Order Limitation Is $150,000 Excluding Subsequent In-scope Modifications. The Government May Combine Several Projects, As Indicated By Separate Statements Of Work And Individual Line Items, In One Task Order, As Required. the Maximum Value Of The Contract Will Not Exceed $1 Million Over The Life Of The Contract. the Government At Its Option May In A Rare Case Include Projects Exceeding $150,000. However, Contractors Will Not Be Obligated To Compete Nor Required To Accept Such Task Orders Under The General Terms Of The Contract. This Is Not A Requirements Contract. Transportation, Handling, And Storage the Contractor Shall Coordinate With Suppliers And Shippers To Ensure That Incoming Materials Are Properly Identified With The Contractor S Name, Contract Number And Project Title. The Contractor Shall Designate An Authorized Individual To Be Available To Receive Shipment. The Government Warehouse Facilities Are Not The Shipping Point And Are Not Available For Contractor S Use. The Government Will Not Provide Storage Other Than That Available At The Project Site. storage Of Supplies, Materials And Equipment On The Project Site Shall Be Accomplished In Such A Manner So As To Prevent Mechanical And Climatic Damage And Loss Due To Vandalism Or Theft. Equipment Temporarily Removed In The Performance Of Work And Stored On The Job Site Shall Be Stored And Protected In Accordance With Previous Paragraphs, And Shall Be Replaced In A Condition Compatible With Its Original State. Security For Equipment And Material Removed From The Job Site For Temporary Storage Until Reuse Shall Be The Responsibility Of The Contractor. F. Cleanup And Disposal Of Debris And Fill Materials at The End Of Each Workday, The Contractor Shall Clean Up The Work And Storage Areas And Stack All Materials In A Manner Approved By The Contracting Officer Or His/her Designated Representative. Upon Completion Of A Project, The Contractor Shall Ensure That All Dirt, Trash, And Debris Resulting From The Construction Operations Are Removed From The Work Area. Unless Directed Otherwise In The Contract Or By The Contracting Officer, Disposal Of Debris Shall Be Made At The Contractor S Expense And Shall Be Delivered To A State Approved Disposal Site Located Off The Va Grounds And/or Cboc Locations. Debris Shall Not Be Left In Such A Manner That Wind Or Other Weather Conditions Can Cause The Debris To Be Scattered Outside The Work Area Or Inside The Facilities Via Local Foot Traffic. g. Infection Control Procedures attachment A infection Control Procedures Part 1 General definitions construction Type A - Inspection And Non-invasive Activities. Includes, But Is Not Limited To: Removal Of Ceiling Tiles For Visual Inspection Limited To 1 Tile Per 50 Square Feet; Painting (but Not Sanding); Wall Covering; Electrical Trim Work; Minor Plumbing; And Activities Which Do Not Generate Dust Or Require Cutting Of Walls Or Access To Ceilings Other Than For Visual Inspection. construction Type B - Small Scale, Short Duration Activities That Create Minimal Dust. Includes, But Is Not Limited To: Installation Of Telephone Or Computer Cabling; Access To Pipe Chase Spaces; Cutting Of Walls Or Ceilings Where Dust Migration Can Be Controlled. construction Type C - Any Work, Which Generates A Moderate To High Level Of Dust Or Requires Demolition Or Removal Of Any Fixed Building Components Or Assemblies. Includes, But Is Not Limited To: Sanding Of Walls For Painting Or Wall Covering; Removal Of Floor Coverings, Ceiling Tiles And Casework; New Wall Construction; Minor Ductwork Or Electrical Work Above Ceilings; Major Cabling Activities; And Any Activity Which Cannot Be Completed Within A Single Work Shift. construction Type D - Major Demolition And Construction Projects. Includes, But Is Not Limited To: Activities That Require Consecutive Work Shifts; Require Heavy Demolition Or Removal Of A Complete Ceiling System; And New Construction. group 1 Lowest Risk Patient Risk Group - Office Areas group 2 Medium Risk Patient Risk Group - Cardiology, Echocardiography, Laboratories, Nuclear Medicine, Physical Therapy, Radiology/mri, Respiratory Therapy group 3 Medium-high Risk Patient Risk Group - Emergency Room, Day Surgery, Pharmacy, Endoscopy group 4 Highest Risk Patient Risk Group - Dialysis Unit; Oncology Unit; Operating Rooms; Sterile Processing, Cardiac Catheterization & Angiography Areas, Intensive Care Unit(s); Medical/surgical Nursing Units, Post-anesthesia Care Units. hepa - High Efficiency Particulate Air hepa Filtered Equipment That Uses A Hepa Filter That Complies With Mil-std-282 Method 102.9.1 And Captures A Minimum Of 99.97% Of Particulate Matter That Is 0.3 Micron In Diameter. level Of Infection Control - Class I, Ii, Iii Or Iv, As Determined From The Infection Control Risk Assessment Matrix. description the Purpose Of The Infection Control Procedures Are To Minimize The Risk Of Infection During Construction By Maintaining The Integrity Of The Environment, And Controlling The Spread Of Dust. the Following Infection Control Matrix Defines The Matrix Of Precautions To Be Implemented For Construction, Demolition And Renovation. Matching The Planned Construction Type With The Patient Risk Group On The Matrix Defines The Minimum Level Of Infection Control Required (class I, Ii, Iii Or Iv). risk Level type A construction Activity type B Type C Type D group 1 Lowest Risk class I class Ii Class Ii Class Iii/iv group 2 Medium Risk class I class Ii Class Iii Class Iv group 3 High Risk class Ii class Ii Class Iii/iv Class Iv group 4 Highest Risk class I: class Ii class Iii/iv Class Iii/iv Class Iv execute Work By Methods To Minimize Raising Dust And Fumes From Interior And Exterior Construction Operations. water Mist Work Surfaces To Control Dust immediately Replace A Ceiling Tile Displaced For Visual Inspection use Travel Routes That Minimize Exposure Of Patients To Construction Workers, Materials, Tools, And Equipment. schedule Utility Interruptions During Periods Of Low Hospital Activity. class Ii: In Addition To Precautions For Class I: provide Temporary Icra Barrier Around Construction Area To Prevent Airborne Dust From Dispersing Into Atmosphere Using Fire Resistive Polyethylene Secured By Poles, Clips And Tape With Zipper Door Access Or Use Approved Self-contained Icra Cart With Telescoping Icra Barrier At Every Opening In Ceiling. hepa Vacuum Upper Surfaces Of Ceiling Tiles Prior To Removal, After Removal Of First Tile. seal Unused Doors With Tape Or Cover Doors With Fire Resistive Polyethylene And Seal All 4 Edges. block Off And Seal Air Vents In Work Area, Or Isolate Hvac System In Areas Where Work Is Being Performed To Prevent Contamination Of Ducted Systems. place Adhesive Walk-off Mats At Entrance And Exit Of Work Areas. tightly Cover Waste Containers Before Removing From The Work Area. hepa Vacuum Work Surfaces And Waste Containers Before Removing From The Work Area. hepa Vacuum Worker Clothing, Tools, Materials, And Equipment Before Leaving The Work Area. class Iii: In Addition To The Precautions For Class I And Ii: maintain Negative Air Pressure Within Work Area 24 Hours Per Day, 7 Days Per Week By Utilizing Hepa Equipped Air Filtration Units, Preferably With Exhaust To Exterior Via Windows, And Install Manometer And Record Daily Readings. seal Holes, Pipes, Conduits, And Punctures Through Walls And Floors Within The Work Area Using Fire-safe, Impermeable Materials. (obtain Penetration Permit For Any New Penetrations Involved In The Work.) construct Anteroom (construction Vestibule) Contiguous With Work Area And Require All Personnel To Pass Through This Anteroom So They Can Be Vacuumed Using A Hepa Vacuum Cleaner Before Leaving Work Site. do Not Remove Icra Barriers From The Work Area Until The Completed Project Is Thoroughly Cleaned By The Contractor And The Va S Environmental (housekeeping) Services Department, And Inspected By The Va Project Manager. class Iv: In Addition To Precautions For Class I, Ii And Iii: no Work Is Permitted In Areas Occupied By Patients. all Personnel Entering Work Site Are Required To Wear Head Covers, Shoe Covers And Coveralls. Head Covers, Shoe Covers And Coveralls Must Be Changed Within The Anteroom (construction Vestibule) Each Time The Worker Exits The Work Area. do Not Remove Icra Barriers From The Work Area Until The Completed Project Is Thoroughly Cleaned By The Contractor, The Va S Environmental (housekeeping) Services Department And Inspected By The Va Project Manager. conduct Work By Implementing The Appropriate Level Of Infection Control As Required Or As Noted Herein. submittals government Approval Is Required For Submittals With A "g" Designation; Submittals Not Having A "g" Designation Are For Information Only. sd-06 Test And Inspection Reports Air Sampling Results infection Control Compliance Checklists logs Of Negative Pressure Measurements For Work Site; Sd-07 Certificates employee Training; vamc Infection Control Construction Permits; G quality Assurance qualifications all Personnel Are Required To Wear N95 Respirators, Disposable Booties And Coveralls When Working Inside The Containment. These Are To Be Removed When Exiting The Work Area. all Personnel Are To Be Trained On Infection Control Procedures And These Work Procedures. equipment fire Retardant Polyethylene Hepa Filtered Vacuum hepa Filtered Negative Air Machine Duct Tape framing And Other Materials Necessary To Isolate The Work Area power Equipment That Generates Dust Will Have Dust Collection Equipment Attached. project/site Conditions existing Conditions perform Work Without Damage Or Contamination Of Adjacent Areas. Where Existing Work Is Damaged Or Contaminated, Restore Work To Its Original Condition Or Better As Determined By The Contracting Officer. sequencing And Scheduling all Work Will Be Coordinated With The Hospital Infection Control Office, Facility Director, Safety Department, Security Office And Work Will Not Commence Until The Infection Control Construction Permit Has Been Approved By Vamc For That Specific Work Area, Including Designation Of The Pre-determined Debris Removal Routes. any Issue That Could Have Impact On Vamc Operations Must Be Reported To The Vamc Project Representative Before Commencement. This Would Include Containment Breeching, Loss Of Negative Pressure, Releases Of Dust/debris Into Uncontrolled Interior Building Areas Or Other Issues That Could Affect Infection Control Procedures. work Phasing And Breakout Of Specific Work Areas Shall Be In Coordination With The Contracting Officers Needs And The General Contractor's Schedule And Not Adversely Affect The Operations Of The Vamc In Any Way. part 2 Products not Used. part 3 Execution preparation obtain An Infection Control Construction Permit Prior To Performing Any Work Of Construction Types A Through D As Defined Above. No Work Will Be Allowed To Proceed Until An Infection Control Construction Permit Has Been Completed And Signed And All Protective Measures Required By The Permit Are In Place. all Work Shall Be Accomplished Using The Controls Indicated In The Specifications And On The Infection Control Construction Permit For The Class Of Protection Required For The Work. removal Of A Single Ceiling Tile In A Suspended Acoustic Ceiling For Observation Purposes Only Does Not Require An Infection Control Construction Permit. existing Air Handling Ductwork, Supply And Return Grills, And/or Hvac Fresh Air Intakes Shall Be Isolated Using Air Tight Seals. elevator Use Must Be Coordinated With Facilities And Must Not Impact Vamc Operations. Time And Dates Of Waste Load Must Be Identified Each Day. erection install Impervious Barriers From Floor To Ceiling And Wall To Wall To Seal Work Areas From Non-work Areas. When Work Is In An Area Designated For Class Iv Protection, Double Impervious Barriers Shall Be Used. impervious Barriers Shall Be Constructed Of Non-combustible Or Fire Retardant Materials. Barriers Shall Be Minimum One-hour Rated Construction. Fire Retardant Polyethylene May Be Used For Impervious (dust) Barriers That Remain In Place For Not More Than 72 Hours. Construct All Other Barriers Of Gypsum Board (flame Spread Rating Of 25 Or Less In Accordance With Astm E84) On Both Sides Of Metal Steel Studs. Extend The Partitions Through Suspended Ceilings To Floor Slab Deck Or Roof. Wood Framing Is Not Allowed. At Door Openings, Use Class C ¾ Hour Fire/smoke Rated Doors And Frames With Closers. critical Barriers Are To Be Installed On All Doors And Windows And Other Entrances To The Work Area. seal All Holes, Chases, Pipe Cavities And Other Perforations Before Commencing Work. Sealants Shall Be Non-flammable Material. when Required As An Infection Control Measure, Create A Negative Air Pressure Work Area By Installing Hepa Filtered Negative Air Machines Within The Work Area To Remove Dust Particles From The Air And Exhaust To The Outside. Negative Air Pressure Shall Be Maintained At All Times, Including Non-work Periods, For The Duration Of The Work. maintain Negative Pressure Of At Least -0.02 Inches Water In All Work Areas And Document Compliance. construct An Entry/exit Chamber (construction Vestibule) For Decontaminating People And Equipment Leaving The Work Area. A Hepa Vacuum Is Required To Remove Dust From Equipment And People Leaving The Site. Disposable Ppe Shall Be Removed Prior To Exiting The Entry/exit Chamber. for Projects That Require Maintaining Negative Air Pressure Within The Work Area, Provide An Entry/exit Chamber (construction Vestibule) For Delivering Or Removing Materials And Equipment At The Worksite. delivery And Remove Of Materials And Equipment At The Worksite Must Be Completed In A Manner That Maintains The Specified Negative Air Pressure Within The Work Area At All Times. adhesive Step-off Pads At Least 24"x36" Are To Be Located At The Exit Of The Work Area Before Entering The Occupied Areas Of The Vamc. vacuum The Top Surfaces Of Ceiling Tiles Using A Hepa Vacuum Prior To Removal Of Ceiling Tiles. Traffic Shall Be Minimized To/from The Work Area. elevators Or Stairwells Within The Work Area Must Be Isolated With Impervious Barriers. activities Such As Cutting, Demolishing, And Other Large Dust Generating Activities Shall Have Work Surfaces Water-misted Prior To Impact. where Powered Equipment That Generates Dust Will Be Utilized, Such Equipment Shall Have Dust Collection Equipment Attached. provide Active Means To Prevent Airborne Dust From Dispersing Into The Atmosphere. field Quality Control inspection conduct Daily Infection Control Inspections Using The Vamc Infection Control Compliance Checklist On Page 2 Of The Infection Control Construction Permit. Daily Inspections Shall Also Be Conducted On Days When No Construction Activity Is Performed. Submit Compliance Checklist Not More Than 1 Work Day After Completing An Inspection. continuously Monitor Negative Pressure Levels. Document Negative Pressure Levels At The Start Of Work Each Day And At 2 Hour Maximum Intervals During Each Work Day. Maintain A Written Log Of Negative Pressure Levels Measured To Include Date And Time Of The Measurement. Submit Written Log Of Negative Pressure Levels Weekly And Not More Than 1 Work Day After Completing The Last Log Entry Using The Vamc Infection Control Compliance Checklist On Page 2 Of The Infection Control Construction Permit. all Barriers And Hepa Filtered Negative Pressure Are To Remain In Place Until Clearance Has Been Obtained From Vamc Representatives. This Could Include The Ic Department, Safety Department, And Environmental Services Department. tests vamc Representatives May Conduct Post Abatement And During Abatement Sampling For Dust, Mold Spores And Surface Contamination. Sampling May Be Conducted For Dusts Outside The Work Area To Assess Impact. cleaning And Disposal the Construction Area And Adjacent Areas Are To Be Kept In A Clean And Sanitary Manner, Using Damp Methods And Hepa Filtered Vacuuming. dry Sweeping Shall Not Be Allowed. any Dust Tracked Outside Of The Barriers Must Be Removed Immediately And As It Accumulates. surfaces Are To Be Cleaned Daily Or More Frequently If Needed With Vamc Approved Cleaning Products. there Shall Be No Standing Water In The Work Area. All Accidental Spills Must Be Cleaned Up Immediately And Wet Porous Material Removed Within One Hour. any Water Damaged Areas Scheduled For Impact/demolition Shall Be Removed First, Under Hepa Filtered Exhaust And Containment, With The Waste Promptly Bagged, To Reduce Aerosol Of Microbial Agent/fungi/spore From Potentially Escaping Out Of The Work Space. all Barriers Are To Be Removed Carefully To Minimize The Spread Of Contaminants. where Feasible, The Optimal Method For Removal Of Debris Is Via An Exterior Type Chute To Closed Top Containers. where Not Feasible, Waste Is To Be Removed In Clean Air Tight Covered Containers And Transported From The Work Area By A Pre-determined Route During Off-peak Hours. Such Designated Debris Removal Routes Shall Be Cleaned By Damp-mop And/or Hepa Filtered Vacuuming Prior To Being Returned To Patient/staff Use. for Work Performed Exterior To The Building Envelope, No Debris/waste Movement Shall Be Allowed Through The Building Interior Spaces. h. Access To Va Information And Va Information Systems a Contractor/subcontractor Shall Request Logical (technical) Or Physical Access To Va Information And Va Information Systems For Their Employees, Subcontractors, And Affiliates Only To The Extent Necessary To Perform The Services Specified In The Contract, Agreement, Or Task Order. the Contractor Or Subcontractor Must Notify The Contracting Officer Immediately When An Employee Working On A Va System Or With Access To Va Information Is Reassigned Or Leaves The Contractor Or Subcontractor S Employ. The Contracting Officer Must Also Be Notified Immediately By The Contractor Or Subcontractor Prior To An Unfriendly Termination. i. Records Management: the Following Standard Items Relate To Records Generated In Executing The Contract And Should Be Included In A Typical Procurement Contract: citations To Pertinent Laws, Codes And Regulations Such As 44 U.s.c Chapters 21, 29, 31 And 33; Freedom Of Information Act (5 U.s.c. 552); Privacy Act (5 U.s.c. 552a); 36 Cfr Part 1222 And Part 1228. contractor Shall Treat All Deliverables Under The Contract As The Property Of The U.s. Government For Which The Government Agency Shall Have Unlimited Rights To Use, Dispose Of, Or Disclose Such Data Contained Therein As It Determines To Be In The Public Interest. contractor Shall Not Create Or Maintain Any Records That Are Not Specifically Tied To Or Authorized By The Contract Using Government It Equipment And/or Government Records. contractor Shall Not Retain, Use, Sell, Or Disseminate Copies Of Any Deliverable That Contains Information Covered By The Privacy Act Of 1974 Or That Which Is Generally Protected By The Freedom Of Information Act. contractor Shall Not Create Or Maintain Any Records Containing Any Government Agency Records That Are Not Specifically Tied To Or Authorized By The Contract. the Government Agency Owns The Rights To All Data/records Produced As Part Of This Contract. the Government Agency Owns The Rights To All Electronic Information (electronic Data, Electronic Information Systems, Electronic Databases, Etc.) And All Supporting Documentation Created As Part Of This Contract. Contractor Must Deliver Sufficient Technical Documentation With All Data Deliverables To Permit The Agency To Use The Data. contractor Agrees To Comply With Federal And Agency Records Management Policies, Including Those Policies Associated With The Safeguarding Of Records Covered By The Privacy Act Of 1974. These Policies Include The Preservation Of All Records Created Or Received Regardless Of Format [paper, Electronic, Etc.] Or Mode Of Transmission [e-mail, Fax, Etc.] Or State Of Completion [draft, Final, Etc.]. no Disposition Of Documents Will Be Allowed Without The Prior Written Consent Of The Contracting Officer. The Agency And Its Contractors Are Responsible For Preventing The Alienation Or Unauthorized Destruction Of Records, Including All Forms Of Mutilation. Willful And Unlawful Destruction, Damage Or Alienation Of Federal Records Is Subject To The Fines And Penalties Imposed By 18 U.s.c. 2701. Records May Not Be Removed From The Legal Custody Of The Agency Or Destroyed Without Regard To The Provisions Of The Agency Records Schedules. contractor Is Required To Obtain The Contracting Officer's Approval Prior To Engaging In Any Contractual Relationship (sub-contractor) In Support Of This Contract Requiring The Disclosure Of Information, Documentary Material And/or Records Generated Under, Or Relating To, This Contract. The Contractor (and Any Sub-contractor) Is Required To Abide By Government And Agency Guidance For Protecting Sensitive And Proprietary Information.

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Healthcare and Medicine
United States
Closing Date24 Oct 2024
Tender AmountRefer Documents 
Details: The Department Of Veterans Affairs Network Contracting Office 2 Is Issuing This Source Sought Synopsis As A Means Of Conducting Market Research To Identify Parties Having An Interest In And The Resources Providing Testing Of Sterile Compounding Areas At The Northport Vamc, 79 Middleville Road , Northport, Ny 11768. the Result Of This Market Research Will Contribute To Determining The Method Of Procurement. The Applicable North American Industry Classification System (naics) Code Assigned To This Procurement Is 541380. the Va Requires A 12-month Base Year, Plus Four 12-month Options Contract. This Contract Will Be Inclusive Of All Labor, Materials, Equipment, And Travel (within 2 Hours) To Perform Initial And Recurring Certification Of The Facility S Sterile Compounding Areas. based On The Responses To This Sources Sought Notice/market Research, This Requirement May Be Set-aside For Small Businesses Or Procured Through Full And Open Competition. telephone Inquiries Will Not Be Accepted Or Acknowledged, And No Feedback Or Evaluations Will Be Provided To Companies Regarding Their Submissions. submission Instructions: Interested Parties Who Consider Themselves Qualified To Perform The Above Listed Services Are Invited To Submit A Response To This Sources Sought Notice By October 24, 2024, At 12:00pm Est. All Responses Under This Sources Sought Notice Must Be Emailed To Lee.kern@va.gov. please See The Below Statement Of Work (sow): statement Of Work testing Of Sterile Compounding Areas introduction United States Pharmacopeia (usp) Establishes Standards For Cleanroom Design, Environmental Monitoring, And Competencies For The Preparation, Handling, And Storage Of Compounded Sterile Preparations (csps). To Maintain Compliance With These Standards, Northport Vamc Requires A Base Plus Four (4) Year Contract Inclusive Of All Labor, Materials, Equipment, And Travel (within 2 Hours) To Perform Initial And Recurring Certification Of The Facility S Sterile Compounding Areas. Certification And Testing Will Consist Of: Testing All Primary Engineering Controls [(pecs) E.g., Biological Safety Cabinets (bscs), Laminar Airflow Workbenches (lafws), Compounding Aseptic Containment Isolators (caci), And Compounding Aseptic Isolators (cai)] testing All Secondary Engineering Controls (secs), Non-iso Rated Controlled Non-classified (cnc) Rooms, And High-efficiency Particulate Air (hepa) Filtration Devices. microbiological Laboratory Testing Of Collected Viables Samples. wipe Sampling For Environmental Hazardous Drug (hd) Residue testing And Certification Must Be Completed In Accordance With The Most Currently Published Versions Of Usp Chapter , Usp Chapter , Controlled Environment Testing Association (ceta) Application Guides For: Cag-003 Certification Of Sterile Compounding Facilities For Usp Compliance, Cag-002 Compounding Isolator Testing, Cag-008 Certification Matrix For sterile & Nonsterile Usp Compounding Facilities, Cag-009 Viable Environmental Monitoring For Sterile Compounding Facilities, Cag-014 Airflow Visualization Study, National Sanitation Foundation/american National Standards Institute (nsf/ansi) Standard 49 Biosafety Cabinetry, And Institute Of Flow Clean Air Devices, Iest-rp-cc-002.4. All Lab Analysis Of Viable Samples Must Be Performed By A Facility With Iso/iec 17025 Accreditation For Microbial Analysis. This Environmental Quality Testing May Not Be Performed Under The Laboratory S Clinical Laboratory Improvement Amendments (clia) License. The Lab Must Attain Iso/iec 17025 Certification From An External Accrediting Body (e.g., American Association For Laboratory Accreditation ) To Ensure Quality And Accuracy Of The Testing. background. northport Vamc Is Pursuing A Facility Contract For Certification Of All Pecs, Secs, Cnc Rooms, And Hepa Filters Must Be Performed Pursuant To The Most Current Version Of Usp Chapter And Usp Chapter Standards Following Ceta S Standardized Testing Procedures Which Include (but Is Not Limited To) Cag-003 Ceta Certification Guide For Sterile Compounding Facilities For Usp Compliance, Cag-002 Ceta Compounding Isolator Testing Guide, Cag-014 Airflow Visualization Study, And Cag-009 Viable Environmental Monitoring For Sterile Compounding Facilities. certification Must Be Performed Every 6 Months. Recertification Will Be Required After Any Servicing Of Facilities Or Equipment, Post Changes To The Area That Could Affect Airflow Or Air Quality ( E.g., Redesign, Construction, Replacement Or Relocation Of Any Pec, Or Alteration In The Configuration Of The Room), And/or In Response To Identified Problems Or Trends. certification Procedures Defined In Relevant Ceta Application Guides Must Be Performed No Less Than Every 6 Months By An Individual Who Has The Required Ceta Competencies And Training Related To The Certification Of Primary And Secondary Engineering Controls. Additionally, It Is Preferred That The On-site Certification Individual Have Received Nsf Accreditation For The Field Certification Of Class Ii Biosafety Cabinets And Are Accredited Through Cnbt As A Registered Certification Professional In The Sterile Compounding Facility (rcp-scf). Prior To Testing, The Contractor S Technician(s) Who Conduct On-site Certification Will Provide, To The Cor, Documentation Of Competency And Training Related To The Certification Of Pecs And Secs. procedures For Air And Surface Sampling And Evaluation Must Be Compliant As Per The Most Current Usp Chapter 797 Requirements For Environmental Air Sampling, Surface Sampling (cag-009), Gloved Fingertip Testing (cag-011), And Media Fill Testing (cag-013) Following The Appropriate Ceta Cag Application Guide. northport Vamc S Sterile Compounding Areas And Equipment Must Be Compliant To The Joint Commission (tjc) And Food And Drug Administration (fda) Requirements. Tjc Medication Compounding Requirements For Critical Access Hospitals And Hospitals, Effective January 1, 2024, Established New Medication Compounding (mc) Standards For Non-sterile And Sterile Compounded Preparations Which Are Based On Usp Standards. The Fda Has The Authority To Inspect Va Medical Facilities Under The Food, Drug And Cosmetic Act, And Evaluate Based Upon The Guidance Provided In The Insanitary Conditions At Compounding Facilities Guidance For Industry, November 2020 (or Most Current Version). scope testing Frequency. the Northport Vamc Has A Requirement For Onsite Initial And Reoccurring Ceta Certification And Viable Environmental Sampling Of The Facility S Pharmacy-specific And Non-pharmacy Specific Areas And Equipment As Detailed Within This Statement Of Work (sow). Testing And Certification Dates Contained Within This Sow Are Best Documented; Contractor Shall Be Responsible To Confirm And/or Adjust Certification/testing Requirements To Ensure No Lapse In Requirements And Thus No Undesirable Effect On The Mission Of The Northport Vamc. all Pharmacy-specific Equipment Will Minimally Obtain Ceta Certification Every Six (6) Calendar Months From The Date Of The Last Certification/testing Of Bscs, Lafws, Cai, Caci, Hepa Filters, And Room Spaces/environments In Accordance With Vha Directive 1108.12 (see Attachment A), And Usp 797 (attachment B) & 800 (attachment C). Recertification May Be Required Sooner If Equipment Is Relocated/altered, Or A Major Service Is Performed. testing Locations. The Following Location Shall Be Tested As Per Usp 797 And Where Applicable Usp 800 Standards As Per Respective Ceta Guide Applications. Locations May Be Amended As Per The Facility S Renovations And Construction. building 200, Unit 31 Cleanroom Suite(s) Primary Space(s) And Equipment iso-8 Anteroom(s): Two Ceiling Mounted Hepa Filters iso-7 Buffer Room(s) two Ceiling Mounted Hepa Filters one Iso-5 Lawf: Baker Edgegard 5252 Lawf building 200, Inpatient: One Iso-5 Compounding Aseptic Isolator (cai): Baker Ss-500 building 200, New Pavilion 2f, E2-49 hd Negative Pressure Storage Room: One Ceiling Mounted Hepa Filter cnc Hd Negative Pressure C-sca one Ceiling Mounted Hepa Filter one Iso-5 Hd Negative Pressure Compounding Aseptic Containment Isolator (caci): Baker Cs-500 germfree Trailer (adjacent To Building 11) - This Location Will Be Covered Under This Contract For Monthly Viable Sampling And Hazardous Drug Wipe Sampling. note: There Is A Separate Contract Which Covers The Semiannual Ceta Testing And Viable Sampling Of The Trailer. testing Requirements Of Pecs. biological Safety Cabinet (bsc): On-site Certifications Of The Bscs Shall Be Tested To Manufacturer Specifications In Accordance With The Most Recent Version Of Nsf/ansi Standard 49 Biosafety Cabinetry (as Per Ceta Cag-003:2022 Section 8.2. Through 8.2.5 Application Guide And Ceta Cag-005:2007 (or Most Current Versions) compounding Aseptic Isolator (cai) And Compounding Aseptic Containment Isolator (caci): The Contractor Shall Test And Certify All Cais And Cacis As Per Ceta Cag-003 Sections 8.3 Through 8.3.5 And In Accordance With Ceta Cag-002 Guide Application. laminar Air Flow Workbench (lafw): The Contractor Shall Test And Certify All Lafw As Per Ceta Cag-003:2022 Section 8.4. Through 8.4.6 Application Guide (or Most Current Version) the Contractor Shall Test And Certify All Pecs In Accordance With The Most Current Version Of The Institute Of Environmental Sciences And Technology (iest)-rp-cc002 (unidirectional Flow Clean-air Devices), Ceta Cag-003, And The Manufacturer's Specifications. the Contractor Shall Record Each Individual Face Velocity Reading And The Average Of Those Readings, The Downstream Concentration Reading Of The Hepa Filter Leak Test And The Results Of The Induction Leak Test And Back Streaming Test all Equipment Used To Certify Pecs Must Be Calibrated In Accordance With Iest-rp-cc013 Or Manufacturer's Recommendation And Be Nist Traceable Where Possible. where Applicable The List Of Tests For Pecs Includes, Where Applicable But Not Limited To The Following: air Flow Velocity Profile air Flow Visualization Profile: Dynamic Smoke Pattern Testing (video Recorded And Provided To Us On A Thumb Drive Or Made Available For Download On A Secure Website) For All Primary Engineering Controls. Tester Must Utilize Sufficient Smoke To Demonstrate Unidirectional Airflow At Critical Sites And Sweeping Action Over And Away From Preparations. prefilter Check hepa/ulpa Filter Leak Integrity Testing (must Be Performed Upon Installation And As Part Of Certification) induction Leak Integrity Test And Patching If Necessary electrical Leakage And Ground Circuit Resistance And Polarity Tests preparation Ingress And Egress Test Where Applicable chamber Pressure Test total Airborne Non-viable Particle Count Testing In All Classified Areas Performed Under Dynamic Operating Conditions for Each Pec Passing The Required Certification Tests, The Contractor Supplies Each Unit With A Certification Tag Or Sticker Displaying The Following Information: company Name And Contact Information. unit Make, Model And Serial Number. report Number location (e.g., Building, Room Number, Area Identification) certification Date recertification Date technician Name And Signature any Pec That Fails To Meet Ceta Specifications Shall Be Clearly Marked With Signage Which Alerts Compounding Personnel That The Unit Is Out Of Order Until Further Notice. testing Requirements Of Secs. the Contractor Will Provide Comprehensive Cleanroom Testing And Certification Services Every 6 Months, In The Event Of An Environmental Or Engineering Control Excursion/exceedance Or Sooner If There Are Changes To The Area Such As Redesign, Construction, Replacement Or Relocation Of Any Pec, Or Alteration In The Configuration Of The Room That Could Affect Airflow Or Air Quality Or If A Cleanroom(s) Did Not Meet Compliance. Certification Tests For Rooms Within A Cleanroom Suite Include, But Are Not Limited To: airflow Testing: Hepa Filter(s) Air Volumes And Velocities Will Be Measured And Documented As Per Ceta Cag-003:2022 Section 8.1.1 Application Guide (or Most Current Version) Airflow Testing Is Performed To Determine Acceptability Of The Air Velocity, The Room Air Exchange Rate, And The Room Pressure Differential In Doorways Between Adjacent Rooms To Ensure Consistent Airflow And That The Appropriate Quality Of Air Is Maintained Under Dynamic Operating Conditions. the Contractor Shall Calculate The Total Room Area And Volume For Each Buffer Room, Anteroom, Containment Segregated Compounding Area (c-sca), And Hazardous Drug Storage Room. The Iso Classification And A Sketch Of The Room With Dimensions, Exhaust/supply Diffuser Locations And Equipment Locations Shall Be Included In The Report. The Report Provided Will Specify Flow Rates Detailing Returns And Supply That Were Obtained During The Testing. The Contractor Shall Calculate Air Changes Per Hour (acph) For Each Buffer And Anteroom And Include Their Findings In The Report. Acph For Hvac, Acph Contributed From Pec, And The Total Acph. Comparison Of Acph Will Be Completed Both For Usp 797 Standards As Well As Those Referenced In The Vha Hvac Design Manual (attachment D Or Earlier Version If Available), Which Are Further Stringent Than Usp Chapter 797. iso Classified Turbulent Airflow Area Reporting And Documentation record All Airflow Measurements And Their Corresponding Filter Or Diffuser Locations Or Grid Identifications On A Diagram calculate And Report Room Volume calculate And Report The Average Total Room Airflow Volume calculate And Report The Total Air Changes Per Hour Of The Room (include Lafw And/or Non-ducted Bsc Hepa Exhaust To Room, Where Applicable) report Any Correction Factors Used Or Deviations From The Primary Method name Of Test (e.g., Room Airflow Analysis) report Acceptance Criteria provide A Pass Or Fail Statement Based On The Results Of The Test non-iso Classified Negative Pressure Turbulent Airflow Area Testing Procedure Including Acph Requirements For Containment Segregated Compounding Areas And Hazardous Drug Storage Areas, Must Be A Minimum Of 12 Exhaust Acph. Because These Rooms/areas Are Not Iso Classified Airflow Measurements Should Be Taken On The Exhaust Of Negative Pressure Differential Rooms. Non-iso Classified Negative Pressure Turbulent Airflow Reporting And Documentation Must Include: record All Airflow Measurements And Their Corresponding Exhaust Filter Or Exhaust Grill Locations calculate And Report Room Volume calculate And Report The Average Total Room Airflow Volume calculate And Report The Total Air Changes Per Hour Of The Room report Any Correction Factors Used Or Deviations From The Primary Method name Of Test (e.g., Unclassified Negative Pressure Room Airflow Analysis) report Acceptance Criteria provide A Pass Or Fail Statement Based On The Results Of The Test sec Hepa Filter Integrity Testing Performed As Per Ceta Cag-003:2022 Section 8.1.2 Application Guide (or Most Current Version) record Upstream Aerosol Challenge Concentration list Method Used To Report Concentration (measured Or Calculated) record Maximum Leak Penetration In Percent name Of Test (hepa Filter Leak Test) report Acceptance Criteria provide A Pass Or Fail Statement Based On The Results Of The Test sec Room Pressure Differential/room Pressurization As Per Ceta Cag-003:2022 Section 8.1.3 Application Guide (or Most Current Version) the Contractor Shall Include In Their Report Differential Pressure Readings From Each Buffer Room, Anteroom, C-sca, And Hazardous Drug (hd) Storage Rooms To All Surrounding Areas. the Report Shall Indicate Whether The Area Is Required To Be A Negative Or Positive Pressure Location As Per Usp 797 And/or Usp 800. All Readings And Acceptance Criteria Shall Be Documented To At Least One Thousandths Of An Inch Water Gauge Or Water Column (e.g., 0.020 W.g. And Not 0.02 W.g.) Or One Tenth Of A Pascal (e.g., 5.0 Pa). Pressure Differentials Will Be Reflected On A Report Showing The Sketch Of The Room(s). sec Room Pressure Reporting And Documentation report Room Pressure Differential Relative To An Adjacent Room/space report And Compare Performance Of Room Pressure Monitor report Whether Smoke Dispersed At Entry Doors Follows Correct Direction name Of Test (room Pressure Differential Test) report Acceptance Criteria provide A Pass Or Fail Statement Based On The Results Of The Test total Airborne Particle Count Testing (0.5 Micron And Larger) In All Classified Areas Performed Under Dynamic Operating Conditions As Per Ceta Cag-003:2022 Section 8.1.5 Application Guide (or Most Current Version). Reporting Shall Be Completed Following Iso 14644-01 [2015] Section 5.4 Test Report And Shall Include The Following: the Name And Address Of The Testing Organization, And The Date On Which The Test Was Performed the Number And Year Of Publication Of This Part Of Iso 14644 (i.e., Iso 14644 1:2015) a Clear Identification Of The Physical Location Of The Cleanroom Or Clean Zone Testing (including Reference To Adjacent Areas If Necessary), And Specific Designations For Coordinates Of All Sampling Locations (a Diagrammatic Representation Can Be Helpful) the Specified Designation Criteria For The Cleanroom Or Clean Zone, Including The Iso Class Number, The Relevant Occupancy State(s), And The Considered Particle Size(s) details Of The Test Method Used, With Any Special Conditions Relating To The Test, Or Departures From The Test Method, And Identification Of The Test Instrument And Its Current Calibration Certificate the Test Results, Including Particle Concentration Data For All Sampling Locations report Acceptance Criteria provide A Pass Or Fail Statement Based On The Results Of The Test sec Airflow Visualization Studies (avs) - Visual Smoke Studies Per Ceta Cag-014 Guide Application sec General Temperature And Moisture Tests To Verify Accuracy Of Monitoring Devices As Per Ceta Cag-003:2022 Section 8.1.7 Application Guide (or Most Current Version) sec Viable Sampling As Per Ceta Cag-003:2022 Section 8.1.6 And Cag-009:2020 Application Guides viable Sampling Testing All Viable Sampling Will Conform To Usp 797 Requirements And Performed As Per Ceta Cag-009 Application Guide Viable Environmental Monitoring For Sterile Compounding Facilities environmental Air Sampling. biannually (every Six Months) The Collection Of Environmental Air Samples Will Be Performed By The Contractor S Ceta Technician During Certification And During Negatively Impactful Incidents Which Require Repeat Air Sampling As Follows: whenever There Is A Change To The Placement Of Equipment In The Room Or Any Other Alteration Within The Cleanroom Suite That Affects The Quality Of The Air. in Response To Identified Problems And Trends. in Response To Changes That Could Impact The Sterile Environment (changes In Cleaning Agents). viable Air Sampling Will Be Performed Utilizing A Calibrated High-volume Impaction Sampler During Dynamic Operating Conditions Single Plate Tsa Media Which Supports Growth Of Both Bacteria And Fungi Will Be Used To Sample. A Sufficient Volume Of Air (1000 Liters) Shall Be Tested At Each Location To Maximize Sensitivity (samples Of Less Than 1000 Liters Will Not Be Acceptable) positive And Negative Control Plates Will Be Included With Sampled Plates Submitted By The Contractor For Analysis. environmental Surface Sampling. biannually (every Six Months) The Collection Of Environmental Surface Samples Will Be Performed By The Contractor S Ceta Technician And During Repeated Ceta Testing. Upon The Request Of The Facility, The Contractor Will Repeat Surface Sampling As Follows: whenever, There Is A Change To The Placement Of Equipment In The Room Or Any Other Alteration Within The Cleanroom Suite That Affects The Quality Of The Air. in Response To Identified Problems And Trends. in Response To Changes That Could Impact The Sterile Environment (changes In Cleaning Agents). surface Samples Will Be Collected In Each Room, The Interior Of Each Pec, Passthrough Chambers Connecting To Classified Areas, And Frequently Touched Surfaces (e.g., Door, Tables, Carts, Stools, Benches, Etc.) surface Sampling Will Be Performed At The End Of The Largest Csp Activity Of The Day But Before Area Has Been Cleaned And Disinfected. single Plate Tsa Media Supplemented With Neutralizing Additives (e.g., Lecithin And Polysorbate 80) To Neutralize The Effects Of Any Residual Disinfecting Agents Will Be Used. routine Monthly Surface Sampling Will Be Performed By An Appointed Trained Northport Vamc Personnel. The Collected Samples Will Be Shipped To The Laboratory Service Employed By The Contractor For Incubation And Microbiological Analysis. as Needed, Appointed Trained Northport Vamc Personnel Will Collect Surface Samples Within The Pec As A Part Of The Competency Assessment For Assigned Personnel. The Collected Samples Will Be Shipped To The Laboratory Service Employed By The Contractor For Incubation And Microbiological Analysis. personnel Viable Sampling. The Collection Of Personnel Viable Samples For Competency Testing Will Be Performed By An Appointed Trained Northport Vamc Personnel. The Samples Will Be Shipped To The Laboratory Service Employed By The Contractor For Incubation And Microbiological Analysis When It Is Required For Personnel Competency Assessment Sampling As Follows: gloved Fingertip And Thumb (gft) Testing upon Initial Assignment Compounding Staff Will Be Assessed, Post Hand Hygiene And Garbing, Utilizing Gft Samples In Triplicate (three Samples/hand) For Analysis. every Six (6) Months And Thereafter Compounding Staff Will Be Assessed, Post Hand Hygiene And Garbing, Utilizing Single Collection Of Gft Samples (one Sample/hand) Will Be Collected For Analysis Post Hand Hygiene And Garbing. initially And Every Six (6) Months Thereafter Compounding Staff Will Be Assessed For Gft During Aseptic Manipulations, Utilizing Single Collection Of Gft Samples (one Sample/hand) Post Media Fill Testing (mft). media Fill Test (mft) upon Initial Assignment And Every Six Months Thereafter, Compounding Staff Will Be Assessed For Aseptic Manipulations Utilizing Usp 797 Compliant Media Fill Testing Kits. other Viable Sampling Requirements. the Laboratory Service Employed By The Contractor Must Be Able To Provide The Following: microbial Growth Media Plates Which Are Usp 797 Compliant And include Certificates Of Analysis (coa) From The Manufacturer That Verify The Plates Meet The Expected Growth Promotion, Ph, And Sterilization Requirements Consistent With Usp Chapter 797 contain Tsa Supplemented With Neutralizing Additives (lecithin And Polysorbate 80) have A Raised Convex Surface support Both Bacterial And Fungal Growth On The Same Plate For Single Media Incubation media Fill Testing (mft) Kits Compliant To Usp 797 And Designed To Simulate Medium Complexity (category 2) Sterile Iv Compounding. simulate Low Complexity (category 1) Sterile Iv Compounding. a Chain Of Custody Documenting Each Sample Collected Must Be Created And Provided To The Northport Vamc . during Self-sampling, Which Is Performed By Northport Vamc, The Contracted Lab Is Responsible For Providing A Prepaid Mailer For Properly Sending Samples To The Laboratory For Testing. all Samples Shipped To The Laboratory Service Must Be Incubated In Accordance With Current Usp Chapter 797 Requirements For Duration And Temperature. additional Requirements For Pecs And/or Secs Testing any Pec Or Sec That Fails To Meet Ceta Specifications Shall Be Immediately Reported Directly To The Site-identified Point(s) Of Contact (poc) Or Appointed Ad Hoc. areas Where Hazardous Drug Handling Occurs Will Be Tested By Environmental Wipe Sampling For Hazardous Drug (hd) Residue: every 6 Months, Or More Frequently As Needed To Verify Contaminant, Environmental Wipe Sampling For Hd Residue Will Be Performed By An Appointed Trained Northport Vamc Personnel. The Collected Samples Will Be Shipped To The Contractor S Laboratory Service For Hd Residue Analysis. The Kits Used To Complete Hd Wipe Sampling Must Be Verified Prior To Use To Ensure The Sensitivity And Validity Of The Methods And Reagents Used To Recover A Specific Percentage Of Known Marker Drugs. the Hazardous Drugs (hds) To Be Tested Will Be Determined By The Facility And May Include, But Are Not Limited To: cyclophosphamide ifosfamide fluorouracil gemcitabine methotrexate platinum-containing Drugs taxane-based Drugs on Average 14 Surface Environmental Hd Wipe Samples Will Be Collected Per Testing Date. The Facility Can Elect To Adjust The Quantities Of Samples Submitted As Needed During Investigative Remediation. Routine Environmental Hd Wipe Sampling Will Include, At Minimum, The Following Areas: interior Of Containment Primary Engineering Control (c-pec) And Any Equipment Contained Inside The C-pec. pass-through Chambers. surfaces In Staging Or Work Areas Near C-pec. areas Adjacent To C-pecs (e.g., Floors Directly Under C-pec, Staging, And Dispensing Area). areas Immediately Outside The Hazardous Drug Buffer Room Or C-sca. areas Designated For Pharmacist End Product Verification (checking) / Workstations. hazardous Drug Storage Areas (including Refrigerators). hazardous Drug Receiving Areas. patient Administration Areas. competency Of Technician Performing Testing ceta Testing Must Be Performed By A Cnbt Individual/company Accredited To Perform This Work. The Technician/contractor Shall Provide A Copy Of The Individuals Ceta Credentials At Time Of Offer. If, During The Contract, A Different Individual(s) Is Designated By The Contractor, The Ceta Certification Credentials Of The Assigned Individual(s) Must Be Provided To The Poc, Co, And Cor Prior To The Start Of Work. to Ensure Accurate And Reproducible Sampling Results, Environmental Viable Sampling Should Be Performed By A Ceta Cnbt Technician Or A Trained Technician Competent In Air And Surface Sampling Procedures. Prior To Sampling The Contractor Must Provide The Facility Documentation Records For The Individuals Training And Competencies To Perform Sampling. additional Contracting Requirements certification Periodicities Shall Be Confirmed By Contractor, Post Award, And Adjusted As Necessary To Meet The Needs Of The Northport Vamc. certification And Testing Shall Conform To Usp And Osha Standards. technician Will Disinfect And Sanitize All Equipment Brought Into The Cleanroom Suite Or Segregated Compounding Area Prior To Entry (with Preemptâ® Or Peridoxâ® (or Facility Approved Disinfectant Cleaner), Followed By Sterile 70% Isopropyl Alcohol Or As Per Current Standard Operating Procedure For The Cleanroom Suite). contractor Will Follow Northport Vamc S Protocols For Use Of Ppe In The Classified Spaces And Understands The Risks Associated With Facilities And Equipment Designed For Storage And Preparation Of Hazardous Drugs. the Contractor Shall Comply With Federal, State, And Local Laws, Plus And Federal Regulations As Applicable To The Performance Of This Contract; To Include Usp Chapter 797 And Usp Chapter 800. Contractor Must Obtain All Necessary Licenses And/or Permits Required To Perform The Work Herein. reporting Results For Ceta Testing (including Viable Sampling) a General Report Documentation For All Ceta Test Results Must Be Provided Via Email Directly To The Cor (contracting Officer Representative), Chief Of Facility Management Services, Chief Of Pharmacy Service, And To The Designated Compounding Pharmacist No Later Than One Week After The Testing Is Performed. The Ceta Report Will Be A Comprehensive Informative Report Of The Certification Process Which Will Include A Statement Of Compliance Or Non-compliance Regarding The Requirements And Guidelines Outlined Respective To Ceta Application Guide. The Formal Report Will Include As A Minimum, But Not Limited To, The Following Items: name, Address, And Contact Information For The Certifying Organization Also Listing Key Personnel With Appropriate Accreditations Including The Name Of Ceta-certified Technician Performing The Testing. confirming Remark That Facility/equipment Was Tested In Accordance With Ceta Cag-003:2022 (or Most Current Version) And Any Other Applicable Performance Testing Standard Followed. The Most Current Version Of This Cag Must Be Referenced. Note: Usp 797 Is Not A Certification Specification. explanation Of Test Procedure Used For Data Collection And Justification For Any Deviations From Established Industry Practices Encountered During The Certification Process. a List Of Test Equipment Utilized In Data Collection. List Shall Include Make, Model, Serial Number, And Calibration Date. A Copy Of The Current Calibration Documentation For Each Piece Of Equipment Must Be Provided When Requested. required Reporting Values Listed In Each Test Section type, Make, Model And Serial Number For Each Pec Tested each Pec And Sec Nonviable Particulate Counts (including Sample Volume And Time) And Iso Classification measured Air Velocity Data For Pec, Including Air Flow In Cfm, Average And Standard Deviation Of Air Velocity Measurements And Acceptance Criteria pec Blower Setting And Pressure Gauge Reading (if Any) for Bscs: measured Downflow Air Velocity Data, Acceptance Criteria And Pass/fail Result measured Exhaust Damper Acceptance Criteria And Pass/fail Result inflow Velocity Test Method, Measurements, And Results documentation Of Results For The Video Of The Airflow Smoke Pattern Test Documenting Unidirectional Flow At Critical Sites In The Pec. total Air Changes Per Hour (acph) For Each Sec, With Indication Of Acph Supplied By The Pecs pressure Differentials Between Each Sec And The Anteroom/pharmacy results Of Hepa Leak Tests For All Filters Tested, As Well As The Results Of Any Patching That Was Performed if Leaks Were Detected And Sealed, Include A Diagram Showing Approximate Location Of Sealed Leaks prefilter Type, Size, And Condition For Each Pec sec Temperature And Relative Humidity video Recording Of All Smoke Pattern Testing (airflow And Dynamic) alarm Test Results (if Any) a Diagram Of The Areas Tested, Noting The Approximate Location Of Air And Surface Particle Counts any Recommendations For Hepa Replacement/hepa Lifespan microbiological Lab Analysis Reports Must Meet The Following: the Laboratory Performing Microbial Analysis Must Be An American Association For Laboratory Accreditation (a2la)-accredited Laboratory With Iso/iec 17025 Certification For Microbiological Testing. all Viable And Non-viable Analyzed Sampling Results Must Be Provided Via Email Directly To The Chief Of Facility Management Services, Chief Of Pharmacy Service, And To The Designated Compounding Pharmacist No Later Than 2 Weeks After Sampling Is Performed. At A Minimum, The Provided Lab Analysis Report Must Include: the Manufacturer, Lot Number, And Expiration Date For Each Media Lot Analyzed. date And Time Sampling Was Performed. comments Indicating Sampling Under Dynamic Conditions. sampling Location(s), With A Site Map Sketch Identifying Location Of Each Sample Obtained. sampling Type And Incubation Dates, Temperature, And Duration Intervals. quantitative Number Of Discrete Colonies Of Microorganisms On Each Media Device As Colony Forming Units (cfus) Of Bacterial/fungal Isolates. Results Equal To Or Greater Than The Action Level Will Require Immediate Notification To The Facility S The Poc(s). recovered Organisms Identified To The Genus Level (the Pharmacy Must Be Notified Of Any Microbial Growth Immediately After It Is Identified (no Later Than 48 Hours After The Report Is Received By The Contractor From The Laboratory). determination Of Whether Lab Findings Are Actionable (e.g., Acceptable/unacceptable As Per Usp 797). response-travel- Expense Considerations response Time- The Contractor Shall Use Commercially Reasonable Efforts To: provide Technical Support Via Telephone To Northport Vamc On A 24/7, 365 Days A Year Schedule. respond By Telephone To Any Report Of A Malfunction Requiring Repair Within One Hour Of Notification. provide On-site Support Within 2 Hours Of Notification Unless Prevented By Unforeseen Circumstances. travel Time due To The Time Sensitive Nature Of Testing, The Contractor Must Guarantee A Maximum Two-hour Time Travel And Arrival At Facility On Scheduled Testing Dates For Any Required Testing Personnel And Equipment. travel Expenses- contractor Shall Be Responsible For All Service-related Equipment Shipping And Tester S Trip Expenses, Including But Not Limited To Round Trip Travel, Mileage, Meals, And Overnight Living Expenses. title To Equipment- Contractor Shall Not Assume Possession Or Control Of Any Part Of The Equipment. The Government Retains Ownership To Title Thereof. utilities- Contractor May Use Government Utilities, (e.g., Electrical Power, Compressed Air, And Water) Which Are Available And Required For Any Service Performed Under This Contract. access To Equipment- Contractor Shall Be Provided Reasonable Access To All Equipment That Is To Be Serviced And Utility Outlets Required To Do The Service. The Contractor Shall Be Free To Start And Stop All Primary Equipment Incidentals To The Operation Of The Maintained Equipment After Permission Is Received From On Duty Personnel Responsible For Such Equipment. parts And Materials- All Compensation For Parts And Materials Is Included In Contract Price. parts/supplies Quality- Parts And Supplies Provided Under This Contract Shall Be New Oem (original Equipment Manufacturer) Parts. field Service Reports- Contractor Shall Furnish A Written Or Electronic Vendor Supplied Field Service Report (fsr). place Of Performance. northport Vamc 79 Middleville Road northport, N.y. 11768 period Of Performance. base Plus Four (4) Option Years information Security/privacy/ Records Management this Contract Does Not Involve Access To Va Patient/employee Information And Does Not Involve Access And/or Connection To The Va Information System. va Privacy Training For Personnel Without Access To Va Computer Systems Or Direct Access To Or The Use Of Va Sensitive Information the Department Of Veterans Affairs, Va Must Comply With All Applicable Privacy And Confidentiality Statutes And Regulations. One Of The Requirements In Va Is To Have All Personnel Trained Annually On Privacy Requirements. Privacy Represents What Must Be Protected By Va In The Collection, Use, And Disclosure Of Personal Information Whether The Medium Is Electronic, Paper Or Verbal. this Document (20939 Training) Satisfies The Basic Privacy Training Requirement For A Contractor, Volunteer, Or Other Personnel Only If The Individual Does Not Use Va Sensitive Information Or Protected Health Information (phi) In Any Form Such As Electronic Or Paper Or Have Access To Any Va Computer System. the Contracting Officer Representative (cor/ Cotr/ Project Manager) Is Responsible To Obtain This Training From The Contractor And To Maintain According To The Records Control Schedule (rcs 10-1).

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others
United States
Closing Date17 May 2024
Tender AmountRefer Documents 
Details: Disclaimer: This Is A Source Sought Notice Only. This Synopsis Is Not A Request For Quote, Proposal, Or Bid. This Notice Is Not A Solicitation As Defined By Far 2.101, Therefore It Shall Not Be Construed As A Commitment By The Government To Enter Into A Contract, Nor Does It Restrict The Government To An Acquisition Approach. All Information Contained In This Rfi Is Preliminary As Well As Subject To Modification And Is In No Way Binding On The Government. Information Submitted In Response To This Notice Is Voluntary; The Government Will Not Pay For Information Requested Nor Will It Compensate Any Respondent For Any Cost Incurred In Developing Information Provided To The Government. The Government Is Requesting That Restrictive Or Proprietary Markings Not Be Used In Response To This Notice. If A Solicitation Is Released, It Is Will Be Synopsized In The Federal Business Opportunities (fedbizopps) Website Or Gsa. It Is The Responsibility Of The Interested Parties To Monitor These Sites For Additional Information Pertaining To This Rfi. 1. Purpose: John L. Mcclellan Memorial Veterans Hospital Hereby Issues The Following Sources Sought Notice As A Request For Information (rfi). This Rfi Is Being Used For Market Research Purposes Only To Seek Contractors With The Capability To Provide The Central Arkansas Veterans Healthcare System (cavhs) With All Labor, Tools Materials, Supplies, Equipment, Cabling, Licensing, Personnel, Supervision And Transportation Required To Provide Mobile Positron Emission Tomography And Computed Tomography (pet-ct) Scans Trailer System Lease To Cavhs Facilities. See Attached Pws For Further Details. 2. Place Of Performance: John L. Mcclellan Memorial Veterans Hospital 4300 West 7th Street Little Rock, Ar 72205 3. Opportunity: The Cavhs Is Seeking Information From Potential Contractors On Their Ability To Provide This Service. This Is A Request For Information (rfi) Only. Small Business Concerns Are Encouraged To Provide Responses To This Rfi To Assist The Medvamc In Determining Potential Levels Of Competition Available In The Industry. 4. Contact Information: contracting Officer, Joseph Warren email Address: Joseph.warren@va.gov your Responses To This Notice Is Appreciated. performance Work Statement mobile Pet Ct Lease central Arkansas Veterans Healthcare System little Rock, Ar 3/6/2024 1. Purpose 1.1 The Purpose Of This Contract Is To Provide The Central Arkansas Veterans Healthcare System (cavhs) With Continuous Lease Of A Pet Ct System Set Up Inside Of A Shielded Parked Trailer Stationed Outside Of The John L. Mcclellan Vamc In Little Rock, Ar. 1.2 The Entire Offering Of A Pet/ct Mobile Trailer Shall Meet All Local, State, Federal, Industry, Nhpp, Nrc, Joint Commission Nec, Nfpa, Va, Osha, And Other Regulatory Standards. 2. Scope 2.1 The Contractor Shall Provide, Transport, Install, And Test All Listed Equipment. All Products Must Meet All Salient Characteristics Defined In This Section. 2.2 All Equipment And Installation Must Meet Manufacturers And Va Specifications. 2.3 The Contractor Shall Furnish All Supplies, Equipment, Facilities, Expertise, And Services Required For Delivery, Installation, Hookup, Maintenance, And Complete Removal Of The Supplies And Equipment. 2.4 The Contractor Is Responsible For Any Missing Parts And Components Not Included In Order To Carry Out The Installation. 2.5 The Contractor Shall Provide Set Up And Maintenance Of All Equipment To Ensure That It Is Able To Operate At 96% Or More Of Scheduled Uptime. 2.6 The Contractor Will Be Provided A Minimum Seventy-two (72) Hours Notice When The Mobile Unit Is No Longer Required. 2.7 Mobile Unit Shall Be Delivered And Removed, Respectively, On A Date And Time Mutually Agreed Upon Between The Cor And The Contractor. 2.8 Qualified Cavhs Personnel May Need To Perform Pet Scans At Any Time Therefore, The Mobile Unit Will Be Available, And The Va Will Have Access On Site 24 Hours A Day, 7 Days A Week (24/7) For The Agreed Upon Period. 2.9 The Contractor Shall Be Responsible To Maintain All Of The Equipment In Good Working Order At All Times And Shall Reimburse The Va For Any Reasonable Costs Which May Be Associated With Any Defective Workmanship Or Equipment Failure As Further Defined Herein. 2.10 Salient Characteristics 2.10.1 Pet/ct Scanner That Meets Or Exceeds The Following Characteristics: canon Mobile Cartesion Prime Digital Pet/ct Aero Or Equivalent, As Listed Below: extra-large 27 Cm (axial Fov) Digital Pet Detector With 1 To 1 Coupling fast 263 Psec Time Of Flight Or Better To Enable Fast Patient Scanning At Lower Doses With Optimal Image Quality allows For 1 Bed Acquisition Of Pet Brains With Scan Times As Fast As 5 Minutes allows For 1 Mm Recons As Small As 1 Mm variable Bed Timing To Facilitate 1 Bed, Longer Acquisition For Prostate Psma Without Extending The Overall Whole-body Scan Excessively 27 Cm Field Of View To Allow Users To Easily Capture Large Heart Scans large 4 Cm Ct Detector With 0.5 Mm Slices Providing Low Dose Attenuation Correction And Best Detail Available single Energy Metal Artifact Reduction Software Algorithm That Is Fda Cleared To Scan Any Metal In Any Part Of The Body, Whether Used Prospectively Or Retrospectively 100% Air-cooled Design That Does Not Require A Chiller remote And Automatic Movement Of The Table In Any Direction (up/down, In/out And Side To Side) table Can Be Moved From The Front Of Gantry, Back Of Gantry Or Remotely From The Control Room Console fda Cleared Deep Learning Reconstruction Available For Both Pet And Ct maintains Signal To Noise With A 75% Reduction In Counts Offering Faster Scans, Significantly Lower Dose (images Shown Sub 8 Mci), And With Higher Quantitative Accuracy large Bore Size With A 78 Cm Flared Gantry Opening includes 65" X 36" X 30" Console Desk & Two Multifunction Task Chars With Arms includes Dicom 3 Modality Worklist Management Service Class User System With Q/r & Store includes Image Quality Phantom include Power Distribution Unit applications Training To Include Advanced Cardiac Ct Course For Technologists wall Mount For Display injector Synchronization Kit cardiac Gating Scan Kit ecg Gated Scanning, Monitor, R-wave Trigger gantry Rear Control Panel flex Pedestal Dual Flow Injector vitrea Oncology Advanced Option neuro Package respiratory Gating Acquisition Software ability To Function Independently As A Whole-body Multi-slice Ct auto Kv Can Be Set For Protocols automatic Couch Height Positioning Compensation For Incorrect Patient Positioning active Collimation To Eliminate Exposure That Is Not Used For Diagnosis compliance With National Electronic Manufacturers Association (nema) Standards Xr25, Xr26, & Xr29. console With Ms Windows 10 Operating System And Ergonomic Operator Controls applications, Technical, And Service Support For Customers 24 Hours A Day, Seven Days A Week fire Suppression System ada Compliant Bathroom With Either Greywater Tanks In Underbelly Or With Connection To Local Sewer As Desired By Customer (see Para 2.11.2.6). appropriate Lead Shielding And Distance Configured Into The Design In Accordance With Independent 3rd Party Health Physicist Calculations amst Standard Hot Lab Cabinet With Installation Of Components And Lead Shielding Around Hot Lab Cabinet Room support And Maintenance, Including: a Quality Assurance Program Which Meets Or Exceeds Joint Commission Standards marketing Support operations Support parts And Service On Equipment That Complies With Oem Recommendations all Service And Maintenance As Required To Maintain It In Proper Working Order And Suitable For Use By Cavhs For Patient Care. schedule Maintenance And Ad Hoc Repair Of Equipment To Ensure That It Operates At 96% Or More Of Scheduled Uptime. twenty-four Hour Response Time To Resolve Critical Repair Issues; Defined As Those That Prohibit The System To Be Used For Patient Care. forty-eight Hour Response Time To Resolve Urgent Repair Issues; Defined As Those That Have A Significant Negative Impact On Workflow And/or Comfort. five-day Response Time To Resolve Minor Repair Issues; Defined As Those That Cause Only A Minor Inconvenience To Workflow And/or Comfort Or That Are Strictly Cosmetic In Nature. remote Diagnostic And Technical Support (requires Internet Connection) orientation For Medical Center Staff on-site Applications Training 2.10.5 System Networking Interfaces the Pet Ct Shall Be Able To Send Dicom Images To Both Vista Imaging And The Commercial Pacs (philips Vue Pacs) In Use At Cahvs. Images May Be Sent Directly To Vista & Pacs Or Through A Dicom Router. must Be Compatible With Dicom Modality Worklist C-find {mwl) To Query Exams. contractor's Equipment Must Be Compatible With The Va Existing Equipment And/or It Systems. the Pet Ct Must Be Compatible With The Va S Current And Future Patient Health Record Systems, Specifically Vista And Cerner. at The End Of The Contract Period, The Hard Drive Must Remain With The Va. Cost For A Replacement Hard Drive Should Be Included In The Offeror S Response. 2.11 Delivery And Installation 2.11.1 Delivery - Contractor Shall Ship/deliver All Equipment To The Central Arkansas Veterans Healthcare System, 4300 W. 7th St, Little Rock, Ar 72205. 2.11.2 Installation 2.11.2.1 All Equipment Shall Be Setup/installed Within 5 Business Days Of Delivery At Central Arkansas Veterans Healthcare System, 4300 West 7th Street, 5c-lr, Little Rock, Ar, 72205. 2.11.2.2 Install All Equipment To Manufacturer S Specifications Maintaining Federal, And Local Safety Standards. 2.11.2.3 All Work Shall Be Completed Between 8:00 A.m. And 4:30 P.m. Monday Friday. All Federal Holidays, Excluded. Federal Holidays Are Available At The Federal Holiday Opm Site. 2.11.2.4 If There Is An Operational Conflict With Installation, Night Or Weekend Installation May Be Required. Government Will Provide A 72 Hours' Notice Of Change Of Installation Hours. 2.11.2.5 The Contractor Shall Coordinate All Deliveries, Staging Areas, Installations, And Parking Arrangements With The Cor. 2.11.2.6 Contractor Shall Connect To The Local Sewer For Patient Waste Disposal Using Cavhs-provided Access To The Local Sewer System. 2.11.2.7 The Contractor Shall Remove All Related Shipping Debris And Cleanup Any Construction Associated With Delivery And Installation Of The Specified Items. Contractor Shall Remove All Packaging From The Cavhs Premises. The Contractor Shall Be Responsible For Any Damage To The Building That Occurs Due To Contractor Error Or Neglect. 2.12 Site Conditions 2.12.1 There Shall Be No Smoking On Cavhs Property At Any Time. 2.12.2 Food And Drink Will Only Be Allowed In Designated Areas (cafeteria, Etc.). 2.12.3 Contractor Shall Abide By All Cavhs Rules And Regulation In Regard To Covid-19, Including But Not Limited To Screening Procedures And Use Of Proper Ppe. 2.13 Period Of Performance 2.13.1 The Period Of Performance Shall Be 12-months From A Mutually Agreed Upon Start Date Between Vha And The Contractor, With An Option To Renew For Two Additional 12-months Periods After The Start Date. The Start Date Will Be As Near The Contract Award Date As Possible, However See Paragraph 2.13.2 For Further Guidance. The Contract Is Subject To The Availability Of Va Funds. No Service Shall Be Performed By The Contractor After Dates Indicated, Unless Authorized By The Contracting Officer In Writing. 2.13.2 The Pet Ct Trailer Shall Be Set Up On An Existing Concrete Pad Outside The John L. Mcclellan (jlm) Vamc In Little Rock, Ar. T 2.14 Equipment Maintenace & Repairs 2.14.1 Equipment Provided Shall Be In Good Working Order At All Times In Order To Provide High Quality Scans Required Under This Solicitation And Any Resulting Contract. Contractor Shall Be Completely Responsible For The Preventive Maintenance, Emergency And General Repairs, Replacement Of Any Defective Parts/components, Safety, Cleaning, And Upkeep Of All Equipment Furnished By The Contractor. Preventative Maintenance/repairs On The Pet Ct Mobile Unit And All Associated Equipment Shall Be Performed In Accordance With The Conformance Standards And Manufacturer's Recommendations. 2.14.2 If The Equipment Should Fail During Normal Working Hours, Emergency Repairs Will Be Performed On-site By Qualified Service Engineers Within A Four-hour Response Time In Order To Reduce Equipment Downtime. Contract Price Shall Be Reduced By A Reasonable Amount In The Event That The Contractor Is Unable To Meet The Response Times Stated Herein Or As Mutually Agreed Upon With The Cor Based Upon Patient Scheduling. Notwithstanding, If It Is Determined That The Equipment Cannot Be Repaired On Site Within An Agreed Upon Period Of Time, The Contractor Agrees To Replace The Mobile Unit Within Forty-eight (48) Hours Of Equipment Failure. Contract Price Will Be Adjusted For Any Days In Which The Equipment Cannot Be Used. 2.14.3 Va Shall Be Responsible For The Overall Housekeeping Of The Unit Including But Not Limited To Removal And Proper Disposal Of All Debris On A Daily Basis Or As Often As Necessary To Maintain A Sanitized And Neat Environment In Accordance With The Conformance Standards. 2..14.4 The Contractor Shall Furnish And Replace Parts To Meet Times Specified In This Agreement. The Contractor Has Ready Access To All Parts, Including Unique And/or High Mortality Replacement Parts. All Parts Supplied Shall Be Compatible With Existing Equipment. The Contract Shall Include All Parts Required. The Contractor Shall Use New Or Rebuilt Parts. All Parts Shall Be Of Current Manufacture And Have Complete Versatility With The Presently Installed Equipment. All Parts Shall Perform Identically To The Original Equipment Specifications. Rebuilt Parts, Used Parts Or Those Removed From Another Piece Of Equipment Shall Not Be Installed Without Specific Approval By The Co Or The Cor. 3. Inspection And Acceptance: 3.1 The Contractor Shall Conduct A Joint Inspection With The Cor Upon Delivery Of Equipment. 3.2 Contractor Shall Provide Dates Of Completion Of Punch List Items And Replacement Parts And/or Short Ship Items From The Manufacturer(s). 3.3 The Cor Shall Ensure All Work Is Completed Satisfactorily Prior To Acceptance. Disputes Shall Be Resolved By The Contracting Officer. 4. Delivery/storage Requirements 4.1 Deliver Materials To Cavhs In Manufacturer's Original Sealed Containers With Brand Name Marked Thereon. 4.2 Package To Prevent Damage Or Deterioration During Shipment, Handling, Storage And Installation. Maintain Protective Covering In Place And In Good Repair Until Removal Is Necessary. 4.3 Deliver Specified Items Only When The Site Is Ready For Installation Work To Proceed. 4.4 Store Products In Dry Condition Inside Enclosed Facilities. 4.6 Any Government Requested Delayed Delivery Up To 90 Days After Initial Delivery Date, Shall Be At No Additional Cost To The Government. 4.7 A Pre-delivery Meeting Will Be Conducted 15 Business Days Prior To Initial Negotiated Delivery Date For Verification Of Delivery And Installation Dates. 4.8 Delivery And Installation Will Be Coordinated Through The Cor. 5. Deliverables 5.1 Operation And Maintenance Manuals 5.1.1 Binders - Quantity (1) For Each Equipment Item. 5.1.2 Digital Copies- Quantity (1) For Each Equipment Item. 5.2 Deliver Compilation Of All Manufacturer Recommended Maintenance Schedule And Operation Materials Packaged In Binder(s) To Cor Upon Completion Of Installation. 6. Operator Training: Contractor Shall Provide On-site Training Of The Equipment To The Users. Scheduling Of Operator Training Shall Be Coordinated With The Cavhs Cor After Installation Is Complete. 7. Protection Of Property 7.1 Contractor Shall Protect All Items From Damage. The Contractor Shall Take Precaution Against Damage To The Building(s), Grounds And Furnishings. The Contractor Shall Repair Or Replace Any Items Related To Building(s) Or Grounds Damaged Accidentally Or On Purpose Due To Actions By The Contractor. 7.2 The Contractor Shall Perform An Inspection Of The Building(s) And Grounds With The Cor Prior To Commencing Work. To Ensure That The Contractor Shall Be Able To Repair Or Replace Any Items, Components, Building(s) Or Grounds Damaged Due To Negligence And/or Actions Taken By The Contractor. The Source Of All Repairs Beyond Simple Surface Cleaning Is The Facility Construction Contractor (or Appropriate Subcontractor), So That Building Warranty Is Maintained. Concurrence From The Va Facilities Management Poc And Cor Is Required Before The Contractor May Perform Any Significant Repair Work. In All Cases, Repairs Shall Utilize Materials Of The Same Quality, Size, Texture, Grade, And Color To Match Adjacent Existing Work. 7.3 The Contractor Shall Be Responsible For Security Of The Areas In Which The Work Is Being Performed Prior To Completion. 7.4 Contractor Shall Provide Floor Protection While Working In All Va Facilities. All Material Handling Equipment Shall Have Rubber Wheels. 8. Security Requirements 8.1. Security Clause: "a&a Requirements Do Not Apply--security Accreditation Package Is Not Required". Data Will Be Under The Control Of Va At All Times. Vendor Remote Support Solution Only Has Access To Machine Data And Error Logs. Ephi Is Not Transferred Nor Accessible From The Remote Monitoring Interface. access To Va Information And Va Information Systems a. The Contractor Will Not Have Access To Va Desktop Computers, Nor Will They Have Access To Online Resources Belonging To The Government While Conducting Services. If Removal Of Equipment From The Va Is Required, Any Memory Storage Devices, Such As Hard Drives, Solid State Drives And Non-volatile Memory Units Will Remain In Va Control And Will Not Be Removed From Va Custody.â â  b. The Contractor Will Not Have Access To Protected Patient Health Information (phi) And Nor Will They Have The Capability Of Accessing Patient Information During The Services Provided To The Va And If Removal Of Equipment From The Va Is Required, Any Memory Storage Devices, Such As Hard Drives, Solid State Drives And Non-volatile Memory Units Will Remain In Va Control And Will Not Be Removed From Va Custody.â â  All Research Data Available For Contractor Analyses Is De-identified. c. Contractor Shall Comply With All Applicable Records Management Laws And Regulations, As Well As National Archives And Records Administration (nara) Records Policies, Including But Not Limited To The Federal Records Act (44 U.s.c. Chs. 21, 29, 31, 33), Nara Regulations At 36 Cfr Chapter Xii Subchapter B, And Those Policies Associated With The Safeguarding Of Records Covered By The Privacy Act Of 1974 (5 U.s.c. 552a). These Policies Include The Preservation Of All Records, Regardless Of Form Or Characteristics, Mode Of Transmission, Or State Of Completion.â  d. In Accordance With 36 Cfr 1222.32, All Data Created For Government Use And Delivered To, Or Falling Under The Legal Control Of, The Government Are Federal Records Subject To The Provisions Of 44 U.s.c. Chapters 21, 29, 31, And 33, The Freedom Of Information Act (foia) (5 U.s.c. 552), As Amended, And The Privacy Act Of 1974 (5 U.s.c. 552a), As Amended And Must Be Managed And Scheduled For Disposition Only As Permitted By Statute Or Regulation.â  e. In Accordance With 36 Cfr 1222.32, Contractor Shall Maintain All Records Created For Government Use Or Created In The Course Of Performing The Contract And/or Delivered To, Or Under The Legal Control Of The Government And Must Be Managed In Accordance With Federal Law. Electronic Records And Associated Metadata Must Be Accompanied By Sufficient Technical Documentation To Permit Understanding And Use Of The Records And Data.â  f. Central Arkansas Veterans Healthcare System And Its Contractors Are Responsible For Preventing The Alienation Or Unauthorized Destruction Of Records, Including All Forms Of Mutilation. Records May Not Be Removed From The Legal Custody Of Central Arkansas Veterans Healthcare System Or Destroyed Except For In Accordance With The Provisions Of The Agency Records Schedules And With The Written Concurrence Of The Head Of The Contracting Activity. Willful And Unlawful Destruction, Damage Or Alienation Of Federal Records Is Subject To The Fines And Penalties Imposed By 18 U.s.c. 2701. In The Event Of Any Unlawful Or Accidental Removal, Defacing, Alteration, Or Destruction Of Records, Contractor Must Report To Central Arkansas Veterans Healthcare System. The Agency Must Report Promptly To Nara In Accordance With 36 Cfr 1230. g. The Contractor Shall Immediately Notify The Appropriate Contracting Officer Upon Discovery Of Any Inadvertent Or Unauthorized Disclosures Of Information, Data, Documentary Materials, Records Or Equipment. Disclosure Of Non-public Information Is Limited To Authorized Personnel With A Need-to-know As Described In The [contract Vehicle]. The Contractor Shall Ensure That The Appropriate Personnel, Administrative, Technical, And Physical Safeguards Are Established To Ensure The Security And Confidentiality Of This Information, Data, Documentary Material, Records And/or Equipment Is Properly Protected. The Contractor Shall Not Remove Material From Government Facilities Or Systems, Or Facilities Or Systems Operated Or Maintained On The Government's Behalf, Without The Express Written Permission Of The Head Of The Contracting Activity. When Information, Data, Documentary Material, Records And/or Equipment Is No Longer Required, It Shall Be Returned To Central Arkansas Veterans Healthcare System Control Or The Contractor Must Hold It Until Otherwise Directed. Items Returned To The Government Shall Be Hand-carried, Mailed, Emailed, Or Securely Electronically Transmitted To The Contracting Officer Or Address Prescribed In The [contract Vehicle]. Destruction Of Records Is Expressly Prohibited Unless In Accordance With Paragraph (4). h.the Contractor Is Required To Obtain The Contracting Officer's Approval Prior To Engaging In Any Contractual Relationship (sub-contractor) In Support Of This Contract Requiring The Disclosure Of Information, Documentary Material And/or Records Generated Under, Or Relating To, Contracts. The Contractor (and Any Sub-contractor) Is Required To Abide By Government And Central Arkansas Veterans Healthcare System Guidance For Protecting Sensitive, Proprietary Information, Classified, And Controlled Unclassified Information. i. The Contractor Shall Only Use Government It Equipment For Purposes Specifically Tied To Or Authorized By The Contract And In Accordance With Central Arkansas Veterans Healthcare System Policy.â  j. The Contractor Shall Not Create Or Maintain Any Records Containing Any Non-public Central Arkansas Veterans Healthcare System Information That Are Not Specifically Tied To Or Authorized By The Contract.â  kite Contractor Shall Not Retain, Use, Sell, Or Disseminate Copies Of Any Deliverable That Contains Information Covered By The Privacy Act Of 1974 Or That Which Is Generally Protected From Public Disclosure By An Exemption To The Freedom Of Information Act.â  l. The Central Arkansas Veterans Healthcare System Owns The Rights To All Data And Records Produced As Part Of This Contract. All Deliverables Under The Contract Are The Property Of The U.s. Government For Which Central Arkansas Veterans Healthcare System Shall Have Unlimited Rights To Use, Dispose Of, Or Disclose Such Data Contained Therein As It Determines To Be In The Public Interest. Any Contractor Rights In The Data Or Deliverables Must Be Identified As Required By Far 52.227-11 Through Far 52.227-20. m. Training.  all Contractor Employees Assigned To This Contract Who Create, Work With Or Otherwise Handle Records Are Required To Take [agency]-provided Records Management Training. The Contractor Is Responsible For Confirming Training Has Been Completed According To Agency Policies, Including Initial Training And Any Annual Or Refresher Training.â  8.3. Va Information Custodial Language a. Bio-medical Devices And Other Equipment Or Systems Containing Media (hard Drives, Optical Disks, Etc.) With Va Sensitive Information Must Not Be Returned To The Vendor At The End Of Lease, For Trade-in, Or Other Purposes. the Options Are: (1) Vendor Must Accept The System Without The Drive; (2) Va S Initial Medical Device Purchase Includes A Spare Drive Which Must Be Installed In Place Of The Original Drive At Time Of Turn-in; Or (3) Va Must Reimburse The Company For Media At A Reasonable Open Market Replacement Cost At Time Of Purchase Occur That May (4) Due To The Highly Specialized And Sometimes Proprietary Hardware And Software Associated With Medical Equipment/systems, If It Is Not Possible For The Va To Retain The Hard Drive, Then; (a) The Equipment Vendor Must Have An Existing Baa If The Device Being Traded In Has Sensitive Information Stored On It And Hard Drive(s) From The System Are Being Returned Physically Intact; (b) Any Fixed Hard Drive On The Device Must Be Non-destructively Sanitized To The Greatest Extent Possible Without Negatively Impacting System Operation. Selective Clearing Down To Patient Data Folder Level Is Recommended Using Va Approved And Validated Overwriting Technologies/methods/tools. Applicable Media Sanitization Specifications Need To Be Preapproved And Described In The Purchase Order Or Contract. (c) A Statement Needs To Be Signed By The Director (system Owner) That States That The Drive Could Not Be Removed And That (a) And (b) Controls Above Are In Place And Completed. The Iso Needs To Maintain The Documentation. 8.4 Security Incident Investigation a. The Term Security Incident Means An Event That Has, Or Could Have, Resulted In Unauthorized Access To, Loss Or Damage To Va Assets, Or Sensitive Information, Or An Action That Breaches Va Security Procedures. The Contractor/subcontractor Shall Immediately Notify The Cor And Simultaneously, The Designated Iso And Privacy Officer For The Contract Of Any Known Or Suspected Security/privacy Incidents, Or Any Unauthorized Disclosure Of Sensitive Information, Including That Contained In System(s) To Which The Contractor/subcontractor Has Access. b. To The Extent Known By The Contractor/subcontractor, The Contractor/subcontractor S Notice To Va Shall Identify The Information Involved, The Circumstances Surrounding The Incident Including To Whom, How, When, And Where The Va Information Or Assets Were Placed At Risk Or Compromised), And Any Other Information That The Contractor/subcontractor Considers Relevant. c. With Respect To Unsecured Protected Health Information, The Business Associate Is Deemed To Have Discovered A Data Breach When The Business Associate Knew Or Should Have Known Of A Breach Of Such Information. Upon Discovery, The Business Associate Must Notify The Covered Entity Of The Breach. Notifications Need To Be Made In Accordance With The Executed Business Associate Agreement. d. In Instances Of Theft Or Break-in Or Other Criminal Activity, The Contractor/subcontractor Must Concurrently Report The Incident To The Appropriate Law Enforcement Entity (or Entities) Of Jurisdiction, Including The Va Oig And Security And Law Enforcement. The Contractor, Its Employees, And Its Subcontractors And Their Employees Shall Cooperate With Va And Any Law Enforcement Authority Responsible For The Investigation And Prosecution Of Any Possible Criminal Law Violation(s) Associated With Any Incident. The Contractor/subcontractor Shall Cooperate With Va In Any Civil Litigation To Recover. 8.5 Liquidated Damages For Data Breach a. Consistent With The Requirements Of 38 U.s.c. §5725, A Contract May Require Access To Sensitive Personal Information. If So, The Contractor Is Liable To Va For Liquidated Damages In The Event Of A Data Breach Or Privacy Incident Involving Any Spi The Contractor/subcontractor Processes Or Maintains Under This Contract. b. The Contractor/subcontractor Shall Provide Notice To Va Of A Security Incident As Set Forth In The Security Incident Investigation Section Above. Upon Such Notification, Va Must Secure From A Non-department Entity Or The Va Office Of Inspector General An Independent Risk Analysis Of The Data Breach To Determine The Level Of Risk Associated With The Data Breach For The Potential Misuse Of Any Sensitive Personal Information Involved In The Data Breach. The Term 'data Breach' Means The Loss, Theft, Or Other Unauthorized Access, Or Any Access Other Than That Incidental To The Scope Of Employment, To Data Containing Sensitive Personal Information, In Electronic Or Printed Form, That Results In The Potential Compromise Of The Confidentiality Or Integrity Of The Data. Contractor Shall Fully Cooperate With The Entity Performing The Risk Analysis. Failure To Cooperate May Be Deemed A Material Breach And Grounds For Contract Termination. c. Each Risk Analysis Shall Address All Relevant Information Concerning The Data Breach, Including The Following: (1) Nature Of The Event (loss, Theft, Unauthorized Access); (2) Description Of The Event, Including: (a) Date Of Occurrence; (b) Data Elements Involved, Including Any Pii, Such As Full Name, Social Security Number, Date Of Birth, Home Address, Account Number, Disability Code; (3) Number Of Individuals Affected Or Potentially Affected; (4) Names Of Individuals Or Groups Affected Or Potentially Affected; (5) Ease Of Logical Data Access To The Lost, Stolen Or Improperly Accessed Data In Light Of The Degree Of Protection For The Data, E.g., Unencrypted, Plain Text; (6) Amount Of Time The Data Has Been Out Of Va Control; (7) The Likelihood That The Sensitive Personal Information Will Or Has Been Compromised (made Accessible To And Usable By Unauthorized Persons); Va Information, Obtain Monetary Or Other (8) Known Misuses Of Data Containing Sensitive Personal Information, If Any; (9) Assessment Of The Potential Harm To The Affected Individuals; (10) Data Breach Analysis As Outlined In 6500.2 Handbook, Management Of Security And privacy Incidents, As Appropriate; And (11) Whether Credit Protection Services May Assist Record Subjects In Avoiding Or Mitigating The Results Of Identity Theft Based On The Sensitive Personal Information That May Have Been Compromised. d. Based On The Determinations Of The Independent Risk Analysis, The Contractor Shall Be Responsible For Paying To The Va Liquidated Damages In The Amount Of $37.50 Per Affected Individual To Cover The Cost Of Providing Credit Protection Services To Affected Individuals consisting Of The Following: (1) Notification; (2) One Year Of Credit Monitoring Services Consisting Of Automatic Daily Monitoring Of At Least 3 Relevant Credit Bureau Reports; (3) Data Breach Analysis; (4) Fraud Resolution Services, Including Writing Dispute Letters, Initiating Fraud Alerts And Credit Freezes, To Assist Affected Individuals To Bring Matters To Resolution; (5) One Year Of Identity Theft Insurance With $20,000.00 Coverage At $0 Deductible; And (6) Necessary Legal Expenses The Subjects May Incur To Repair Falsified Or Damaged Credit Records, Histories, Or Financial Affairs. 8.6 Confidentiality And Nondisclosure It Is Agreed That: a. The Preliminary And Final Deliverables And All Associated Working Papers, Application Source Code, And Other Material Deemed Relevant By The Va Which Have Been Generated By The Contractor In The Performance Of This Task Order Are The Exclusive Property Of The U.s. Government And Shall Be Submitted To The Co At The Conclusion Of The Task Order. b. The Co Will Be The Sole Authorized Official To Release Verbally Or In Writing, Any Data, The Draft Deliverables, The Final Deliverables, Or Any Other Written Or Printed Materials Pertaining To This Task Order. No Information Shall Be Released By The Contractor. Any Request For Information Relating To This Task Order Presented To The Contractor Shall Be Submitted To The Co For Response. c. Press Releases, Marketing Material Or Any Other Printed Or Electronic Documentation Related To This Project, Shall Not Be Publicized Without The Written Approval Of The Co. 8.7 Reference (s): 1. Va Affairs Handbook 6500, Risk Management Framework For Va Information Systems Tier 3: Va Information Security Program, 10 Mar 2015. 2. Veterans Health Administration Procurement Manual (vha Pm) 11/3/2014. 3. Va Handbook 1901.01, Health Information Management And Health Records 19 Mar 15. 4. Vha Handbook 1605.5, Business Associate Agreements 22 July 2014 5. Memo: Va Maintenance/installation (warranty) Contracts (vaiq 7058822), 24 Mar 2011. 6. Va Directive 0735, Homeland Security Presidential Directive 12 (hspd-12) Program, Dated February 17, 2011. 7. Veterans Affairs Handbook 6500.6 Contract Security, 12 Mar 2010. 8. Health Insurance Portability & Accountability Act (hipaa) Privacy Rule (see 45 Crf 164, 502(a)(1). 9. Va Directive 0710, Personnel Security And Suitability Program, Dated June 4, 2010. 10. Va Directive 6066, Protected Health Information. 11. Privacy Act Of 1974 (5 U.s.c. 552a). 12. Homeland Security Presidential Directive (hspd-12), 13. Federal Information Processing Standards Publication (fips) 201, Personal Identity Verification (piv) Of Federal Employees And Contractors, Dated Feb 25, 2005, Amended By Fips 201-1, March 2006. 14. Social Security Act (42 U.s.c. § 1395x(u)): Health Care And Other Related Services, As Mentioned In Hipaa Regulations, Are Defined In Detail Under Section 1861(s) Http://www.ssa.gov/op_home/ssact/title18/1861.htm. 15. Va Directive 6512, Secure Wireless Technology, Dated 4 Nov 2009

DEPT OF THE ARMY USA Tender

Manpower Supply
United States
Closing Date3 Jun 2024
Tender AmountRefer Documents 
Details: As Of 20 May 2024 The Synposis/solicitation Has Been Revised With The Below And Amendment 0001 Has Been Uploaded To Provide Responses To Rfis. contract Information: This Contract Is Being Procured In Accordance With Public Law 92-582, The Brooks Act As Implemented In Far Subpart 36.6 And In Accordance With The Attached Diplomatic Agreement, the Selection Will Be Based On Demonstrated Competence And Qualifications For The Required Work. One (1) A-e Firm Will Be Selected Based On Demonstrated Competence And Qualifications For The Required Work. The Contract Is Procured By Full And Open Competition Selected Exclusively From Among Danish/greenlandic Sources. the Number One Ranked Firm Will Be Selected For Negotiations Based On Demonstrated Competence And Qualifications For The Required Work. The Length Of This Contract Is A Maximum Of 60 Months And Will Not Include Optional Time Periods. The Total Capacity Of This Contract Will Not Exceed $25,000,000. Task Orders Will Be Issued By Negotiated Firm Fixed Price Task Orders And Will Be Negotiated And Issued Under The Terms And Conditions Of This Indefinite Delivery Contract (idc). The Government Shall Be Under No Obligation To Issue Any Particular Number Or Types Of Orders And No Liability To The Contractor Shall Be Incurred In The Event That A Certain Number Or Types Of Orders Are Not Issued; However, The Government Guarantees A Minimum Ordering Obligation Of $35,000 For The Basic Contract Via The First Task Order In Concurrence With The Idc Award. Labor Rates For Each Discipline, Overhead Rates, And Escalation Factors For Each Year Will Be Negotiated In The Basic Contract; And Profit Will Be Negotiated On A Task Order By Task Order Basis. note: This Is A Minimum Ordering Obligation: Not A Minimum Payment. Contractor Shall Only Be Entitled To Breach Of Contract Damages, I.e., Anticipated Profit For An Order Of This Amount And Provable Standby Costs In The Event That The Government Does Not Issue Orders For The Value Of The Minimum-ordering Guarantee. subcontractors And Outside Associates And Consultants (architect-engineer Services) (far 36.606(e), 44.204(b) And 52.244-4). The Following Applies: “any Subcontractors And Outside Associates Or Consultants Required By The Contractor (prime A-e Firm) In Connection With The Services Covered By The Contract Will Be Limited To Individuals Or Firms That Were Specifically Identified And Agreed To During Negotiations. The Contractor Shall Obtain The Contracting Officer’s Written Consent Before Making Any Substitution For These Subcontractors, Associates, Or Consultants.” If A Substitution Is Necessitated By Illness, Death, Or Termination Of Employment For Whatever Reason, The Selected A-e Firm Shall Notify The Contracting Officer In Writing Within 15 Calendar Days After The Occurrence Of Any Of These Events And Provide The Following Information To The Contracting Officer: Required Information For Substitutions Necessitated By Illness, Death, Or Termination Of Employment For Whatever Reason. The Contractor Shall Provide A Detailed Explanation Of The Circumstances Necessitating The Proposed Substitutions, Complete Resumes For The Proposed Substitutes, And Any Additional Information Requested By The Contracting Officer. Proposed Substitutes Should Have Comparable Qualifications Or Better Qualifications To Those Of The Persons Being Replaced. The Contracting Officer Will Notify The Contractor Within 15 Calendar Days After Receipt Of All Required Information Of The Decision On Substitutions. The Prime A-e Firm Must Obtain The Contracting Officer's Consent To Change Any Subcontractors That Were Identified During Selection And Negotiation. The Contracting Officer Should Refer The Qualifications Of Any New Subcontractor To The Original Selection Board (to The Extent That These Individuals Are Available) For Evaluation. Approval Of These Substitutions May Result In A Price Credit To The Government. to Be Eligible For A Contract Award, A Firm Must Have A Unique Entity Id (uei) Number From System For Award Management (sam) And Be Registered In The Sam. If You Were Not Previously Registered, Please Go To Https://www.sam.gov. Contractors May Obtain Information On Registration And Annual Confirmation Requirements At Http://www.sam.gov. the A-e Firm Selected For This Contract Will Be Required To Utilize The Sam.gov System For Service Contractor Reporting Of Information To The System For Award Management (sam).this Requirement Only Applies To Task Orders That Have A Total Estimated Value, Including Options, That Exceeds $3 Million. For Additional Information See: Https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr. the Federal Acquisition Regulation (far) Requires That Past Performance Information (ppi) Be Collected On Dod Contracts. The Contractor Performance Assessment Reporting System (cpars) Is A Web-enabled Application That Supports The Completion, Distribution, And Retrieval Of All Contract Performance Evaluations. Contractor Representatives Are Responsible For Reviewing And Commenting On Evaluations Submitted On The Contractor Performance Assessment Reporting System (cpars) Website At Https://www.cpars.gov/index.htm. competitive Restrictions participation In The Procurement Is Limited By International Agreement To Danish/greenlandic Companies. Eligible Applicants Must Be Registered As A Business In Denmark As Described Below. Subsidiaries Of A Foreign Company Are Not Eligible Applicants. The Successful Applicant Will Submit A Signed Letter From An Officer Of A Bank Within Denmark Verifying That The Company Conducts Business With That Institution; Payment Will Be Made Only By Electronic Funds Transfer To A Bank In Denmark. 1) Verification The Business Is Registered In The Kingdom Of Denmark. (det Central Virksomhedsregister (cvr)); And 2) The Registered Address Of The Business In Cvr Shall Be In The Kingdom Of Denmark (kod); And 3) A Signed Letter From An Officer Of A Bank Within The Kingdom Of Denmark Verifying That The Company Conducts Business With That Institution. 1. Project Information description Of Services – a-e Services Include But Are Not Limited To The Following: the Scope Of Services Under This Contract Includes, But Is Not Be Limited To, Design And Constructability Reviews, Meeting Minutes, Record Keeping, Budget And Schedule Monitoring And Control, Inspection, Reporting Progress, Safety Monitoring, Meeting Arrangement And Attendance, Submittal Processing, Testing, Progress Payment Processing, Responding To Information Requests, Construction Cost Estimating, Contract Modification Preparation, And Claims Prevention And Claims Processing, Monitoring Labor Provisions, Photo Documentation, And Other Services. Incidental Design And Engineering Management Services May Be Performed Relative To The Performance Of Construction Management Services. The Successful A/e Project Team Will Have The Ability To Provide These Services In The Basic Disciplines (i.e., Architectural, Civil, Structural, Mechanical, And Electrical), As Well As Commissioning With In-house Personnel; Corrosion Control, Seismic Upgrades, And Abatement Of Hazardous Materials. They Must Also Demonstrate Experience And Expertise In Cold Region Design/construction And In Airfield Paving; High-altitude Electromagnetic Pulse (haep) Designs/construction Or Have Experience Performing Welding Inspections On Heap Systems. They Must Also Have Knowledge Of The “working Environment Authority” In Greenland And The “working Environment Act” In Greenland. Joint Venture Or Firm / Consultant Arrangements Will Be Considered And Evaluated For Demonstrated Interdependency Of The Members To Provide Services In The Basic Disciplines As Well As Specialty Fields. this Contract Will Require Experience In Both Military Construction And Civil Works Projects. for The Purposes Of This Idc, Military Construction Experience Is To Include Vertical Construction And Any Horizontal Construction Related To Those Efforts, Including Airfield Paving. Similarly, Civil Works Experience Is To Include Experience In The Areas Of Dredging & Beach Fill Operations, Shoreline Protection And Stabilization, Landfill Protection, Beach Erosion Control. a-e’s Are Expected To Be Able To Provide Qualified A-e Personnel To Field Assignments Within Three Weeks Of Any Task Order Award. This Must Include But Not Be Limited To Mechanical & Electrical Commissioning Disciplines. a. Special Notes: i. The Contractor, As An Independent Contractor And Not As An Agent Of The Government, Shall Provide The Quality Assurance Inspections And Technical Expertise Necessary To Complete Tasks Outlined In This Call. Work Will Be Performed Within The Area Of Pituffik Sb, Greenland. ii. The Contractor Is Required To Perform All Identified Tasks. However, The Contractor May Not Perform "inherently Governmental Functions" As Defined In Far 7.5. As A Matter Of Policy, An "inherently Governmental Function" Is One So Intimately Related To The Public Interest As To Mandate Performance By Government Employees. iii. The Effort Put Forth Under This Contract Shall Not Be Considered Personal Service As Defined In Far 37.104(d). Contractor Personnel Are Not Subject To Continuous Supervision And Control Of A Government Officer Or Employee. In The Firm's Proposal Supplied In Response To The Government's Request For Proposal On Calls And Modifications, The Firm's Proposal Must Clearly Identify Conflicts Of Interest Or Potential Conflicts Of Interest. If No Conflict Exists, The Contractor Shall So State. iv. Contractor Personnel Working On Government Projects Will Be Required To Identify Themselves As "contractors." The Contractor Shall Wear Their Cac Cards In A Clearly Visible Manner On The Government Installation; And Wear Personnel Protective Equipment (ppe) While On The Job Site With Emblems That Identify Them As Contractors. The Contractor's Email Address Will Identify The Contractor As Such. This Identification Applies To All Communication Whether Written, And Verbal. v. The Contractor May Not Be Awarded Any Task Orders For Services On A Construction Contract Which It Has Worked On Or Has A Relationship With The Contractor Which May Present A Conflict Of Interest. 2. Construction Management Services Support Tasks: the Contractor Shall Comply With The Product Delivery Schedule Stated Herein, Except As Otherwise Specified By Individual Task Orders. the Primary A-e Construction Management Services That May Be Requested Under This Contract Include; But Are Not Limited To, Are The Following: . a. Design And Constructability Reviews: i. Submit Comments Citing Specific Deficiencies And Referencing Correct Information Upon Review Of Construction Plans. Deficiencies Shall Include But Are Not Limited To Biddability / Operability / Constructability / Environmental And Sustainability Requirements, Incorrect Citations, Grammar, And Incorrect/missing Procedures. Insure Contractor Compliance With Contract And Specification Requirements. ii. Comments Shall Be Submitted To The Usace Assigned Project Engineer Within 5 Working Days From Receipt Of The Submittal. iii. Submit Comments Citing Specific Deficiencies And Referencing Correct Information Upon Review Of Specifications. Deficiencies Shall Include But Are Not Limited To Biddability / Operability / Constructability / Environmental And Sustainability Requirements, Incorrect Citations, Grammar, And Incorrect / Missing Procedures. Insure Contractor Compliance With Contract And Specification Requirements. comments Shall Be Submitted To The Usace Assigned Project Engineer Within 5 Working Days From Receipt Of The Submittal. iv. Submit Comments Citing Specific Deficiencies And Referencing Correct Information Upon Review Of Technical Submittals. Deficiencies Shall Include But Are Not Limited To Design Flaws, Incorrect Citations, Grammar, Calculation Errors, Incorrect / Missing Procedures, And Compliance To The Construction Contract. Insure Contractor Compliance With Contract And Specification Requirements. Comments Shall Be Submitted To The Usace Assigned Project Engineer Within 5 Working Days From Receipt Of The Submittal. v. Submit Evaluations And Responses To Rfis Submitted By The Construction Contractor Based On Knowledge Of Contractual Requirements, Sound Engineering And Construction Practices, And Other Professional Knowledge. Draft Rfi Responses Shall Be Submitted To The Usace Assigned Project Engineer Within 2 Working Days From Receipt Of The Submittal. vi. Provide Coordination Assistance With Contractors, Local Officials, And The Public As Necessary; And Refer Any Recommendations To The Usace Assigned Project Engineer Within 2 Working Days From Date Of Coordination Meeting. vii. Check Appropriate Codes, Criteria, And Guidelines Including Technical References And Specifications; And Consult With Design Personnel And Subject Matter Specialists In Formulating Recommended Courses Of Action; And Refer Recommendations To The Usace Assigned Project Engineer Within 2 Working Days From Date Of Coordination Meeting. b. Claims Analysis: i. Prepare A Technical Analyses Of Construction Contract Claims Involving Disputes On Contract Interpretations, Contract Modification Costs, Government Caused Delays, Differing Site Conditions, Construction Suspension And Acceleration, And Other Impact And Labor Inefficiency Claims; Prepare Background Data Required For Technical And Legal Review Given A Formal Decision Is Required; Consider All Pertinent Facts Including Quality Assurance (qa) And Contractor Quality Control (cqc) Reports, Master Diaries, Substantiating Correspondence, Other Contract Documents (i.e. Plans And Specifications, Shop Drawings, And Submittals), Government And Commercial Technical Publications And Standards, Interview With Government And Contractor Field Personnel, Etc. Evaluate The Potential Win / Loss Risk And Its Economic Impact On The Project As A Whole. Consider All Outstanding Issues, Such As Other Outstanding Changes, Claims, And Delays, Project Engineer Limitations, And The Potential Cost Of Litigation. Recommend To Government Personnel A Fully Coordinated Position Representing What Is In The "best Interest" Of The Government. For Claims Determined To Have Potential For Merit, Support Negotiations For Extent Of Entitlement And Costs. ii. Prepare A Technical Analysis, For Claims Which Cannot Be Resolved And For Which The Contractor Has Requested A Contracting Officer’s Final Decision, Outlining The Government’s Position. iii. Deliver Each Of The Above-mentioned Technical Analysis To The Contracting Officer Via The Usace Assigned Project Engineer Within 5 Working Days From Receipt Of The Claim. c. Modification Support: assist In Contracting Activities Associated With The Construction Operations, Supporting Government Personnel On Matters Related To Contract Modifications, Changes And Contractor Claims As Follows: i. Submit Comments Furnishing Advice And Assistance On Potential Problems Based On Review Of Contractor Plans, Specifications, Network Analysis, On-site Inspections Etc.; And Make Recommendations For Improving The Administrative Procedures For Processing Changes. Comments Shall Be Submitted To The Usace Assigned Project Engineer Within 3 Working Days From Request. ii. Prepare Independent Government Estimates (ige) Pertaining To Contract Modifications For Government Approval. The Ige Shall Be Submitted To The Usace Assigned Project Engineer Within 3 Working Days From Receipt Of The Scope Of Work. iii. Submit Technical Comments For Pre And Post Negotiation Memorandums (pnms And Poms) For Government Approval. Comments Shall Be Submitted To The Usace Assigned Project Engineer Within 3 Working Days From Request. iv. Submit Comments Citing Specific Deficiencies And Referencing Correct Contractor Information And Proper Requirements Upon Review Of Draft Rfps. Insure Contractor Compliance With Contract And Specification Requirements. Comments Shall Be Submitted To The Usace Assigned Project Engineer Within 2 Working Days From Receipt Of The Submittal. v. Submit Comments Citing Specific Deficiencies And Referencing Correct Information Upon Review Of Scopes Of Work. Deficiencies Shall Pertain But Are Not Limited To Relevancy Of Deliverables, Correct Detail Of Deliverables, And Achievability Of Time Period. Review And Discuss Proposed Changes With The Contractor’ Representatives Regarding Scope To Assure That Contractor’s Proposals Cover All Work Envisioned In The Change. Insure Contractor Compliance With Contract And Specification Requirements. Comments Shall Be Submitted To The Usace Assigned Project Engineer Within 3 Working Days From Receipt Of The Submittal. d. Office Engineering: i. Submit Comments On Contractors' Contract Progress Data, Material And Equipment Usage, Quality Control And Survey Reports To Verify The Validity Of The Computation Of Progress Payments To Contractor. Comments Shall Be Submitted To The Usace Assigned Project Engineer Within 5 Working Days From Receipt Of Contractors' Contract Progress Data. ii. Perform Periodic Reviews Regarding Potential Construction Contractor Claims / Disputes Relative To Contract Requirements And/or Discrepancies In The Drawings And/or Specifications. Comments Shall Be Submitted To The Usace Assigned Project Engineer Within 1 Working Day From Discovering Any Construction Contractor Claims / Disputes And/or Discrepancies In The Drawings Or Specifications. iii. Develop Quality Assurance Plans For Specific Construction Projects And Ensure That They Are Implemented. Qa Plan Shall Be Submitted To The Usace Assigned Project Engineer For Review And Approval Prior To Commencement Of Construction. e. Contract Administration To Include Quality Assurance: i. Submit Daily Quality Assurance (qa) Reports Documenting Quality Assurance Inspections Upon Performing Surveillance Of Contract Work To Assure That The Contractor Is Producing Work In Conformance With The Plans And Specification. Reports Shall Include But Not Limited To Descriptions Of Observed Qc Tests; Defects In Structure, Envelope, Concrete, Mechanical, Electrical, Plumbing, Fire Protection, Fire Alarm, Site Work, And Etc.; And Qa Log. Reports Shall Be Submitted To The Usace Assigned Project Engineer Within 1 Working Day From Date Of The Inspection. ii. Witness Field Tests And Review All Contractor Test Reports And Any Government Materials Tests For Conformance With Specifications; Establish And Maintain A Log Of All Field Tests Required By The Contract And Perform Qa Testing. Notify Usace Assigned Project Engineer Within 1 Day Of Confirming Non-compliant Work. iii. Perform Surveillance Of Survey Operations For Layout And Elevations Of Construction Work. Determine Adequacy And Validity Of Contractor’s Measurement Data. Submit Daily Quality Assurance (qa) Reports. Notify Usace Assigned Project Engineer Within 1 Day Of Confirming Non-compliant Work. iv. Assist On Request Coordination For Passes, Outages, Excavations, Hauling, And Delivery Routes Associated With Projects As Required. Submit Daily Quality Assurance (qa) Reports. Notify Usace Assigned Project Engineer Within 1 Day Of Confirming Non-compliant Work. v. Verify Quantities Of All Work In Place And Materials Stored On Site. Review And Comment On The Accuracy Of The Construction Contractor's Requests For Payment. Submit Daily Quality Assurance (qa) Reports. Notify Usace Assigned Project Engineer Within 1 Day Of Confirming Non-compliant Work. vi. Submit And Distribute Meeting Minutes Upon Attendance At The Preconstruction, Quality Control, Progress Meetings And Conferences. Minutes Shall Be Submitted To The Usace Assigned Project Engineer And All Attendees Within 3 Working Day From Date Of The Meeting. vii. Submit Comments On Interpretation Of Plans And Specifications For Government Use In Contractor Disputes. Comments Shall Be Submitted To The Usace Assigned Project Engineer Within 3 Working Days From Receipt Of The Tasking. viii. Submit Reports On Observed Qa Testing. Reports Shall Include But Not Limited To Test Name, Date, Time, Location, Purpose, Results; Persons Involved Procedures, Weather, And Variables That May Affect Test Accuracy. Reports Shall Be Submitted To The Usace Assigned Project Engineer Within 1 Working Day From Date Of The Testing. ix. Submit Reports On Observed Construction Activities Based On Surveillance Of Contract Work To Assure That The Contractor Is Producing Work In Conformance With The Plans And Specification. Reports Shall Include But Not Limited To Activity Observed, Date, Time, Location, Occurrences That May Affect Quality Of Completed Work, And Procedure Used To Complete Work. Reports Shall Be Submitted To The Usace Assigned Project Engineer Within 1 Working Day From Date Of The Observation. x. Submit Reports On Potential Solutions To Problems Resulting From Unanticipated Requirements. Problems Such As But Not Limited To Inclement Weather, Unforeseen Site Condition, Design Errors Or Omissions, Customer Requested Changes, Or Changed Criteria And Or Accelerated Timetables. Reports Shall Be Submitted To The Usace Assigned Project Engineer Within 2 Working Days From Date Of The Observation Or Tasking. xi. Submit Reports On Health And Safety Nonconformance With Emphasis On Asbestos And Lead Abatement. The Contractor Shall Observe The Construction Contractor's Compliance With Site Specific Health And Safety Plan, Safety Manual And Osha Requirements. Reports Shall Include But Not Limited To The Offender's Name And Location, Date, Time, And Nature Of Violation. Reports Shall Be Submitted To The Usace Assigned Project Engineer Within 1 Working Day From Date Of The Observation Or Tasking. For Serious Safety Violations Which Could Result In Loss Of Life Or Limb Or Compromise Public Safety, Immediate Telephonic Notification And Action Taken Shall Be Provided To The Usace Assigned Project Or Resident Engineer. xii. Submit Comments Upon Review Of The Construction Contractor’s Daily Quality Control (qc) Reports. Evaluate Contractor’s Progress, Quality Control, And Safety Operations For Effectiveness. Comments Shall Include But Not Limited To Validity Of Deficiency, Citing Of Necessary Support Information And Regulations, And. Correct Detail Of Qc Reports. Comments Shall Be Submitted To The Usace Assigned Project Engineer Within 1 Working Day From Date Of The Review. xiii. Submit Comments Upon Review Of The Construction Contractor's Monthly Construction Schedules For Adherence To Contractual Requirements And Schedule. Comments Shall Be Submitted To The Usace Assigned Project Engineer Within 2 Working Days From Date Of The Receipt Of Schedule. xiv. Submit Comments Upon Review Of The Construction Contractor's Monthly Progress Payment Requests Based On Accomplishment Of Objectives In Accordance With Contract Schedule, Price, And Quality Standards. Comments Shall Be Submitted To The Usace Assigned Project Engineer Within 1 Working Day From Date Of The Receipt Of Payment Estimate. xv. Submit Minutes To Meetings Attended. Minutes Shall Include But Not Limited To Due Outs, Important Notes, Updates, And New Issues. Minutes Shall Be Submitted To The Usace Assigned Project Engineer Within 2 Working Days Of The Meeting. xvi. Submit Evaluations Of Contractor Proposals. Evaluations Shall Include But Not Limited To Confirmation Of Correct Scope Of Work Used, Verification Of Complete Scope Of Work Used, Difference In Hours Used Per Task, Difference In Rates Used, And Any Additional Requirements. Comments Shall Be Submitted To The Usace Assigned Project Engineer Within 2 Working Days From Date Of The Receipt Of Contractor Proposal. xvii. Submit Comments Upon Review Of Project Schedule Submissions. Comments Shall Address But Not Limited To Construction Tasks Completed In The Last Week, Tasks Not Completed On Schedule, Reason For Delay, Tasks Completed Early, And Tasks Pushed Forward In The Last Week. Comments Shall Be Submitted To The Usace Assigned Project Engineer Within 2 Working Days From Date Of The Receipt Of Schedule. xviii. Submit Cost Reports Including But Not Limited To Cost Estimation Of Construction Task (labor And Material), Cost Impact On Budget, And Analysis Of Quantities Needed. Reports Shall Be Submitted To The Usace Assigned Project Engineer Within 2 Working Days From Date Of The Receipt Of Tasking. xix. Provide Market Research Support Including But Not Limited To Listing Of Companies Supplying The Needed Requirement, Cost Of Requirements, Lack Of Or Extra Features Provided, And Past Performance. Reports Shall Be Submitted To The. Usace Assigned Project Engineer Within 2 Working Days From Date Of The Tasking. xx. Upon Notification Of Pre-final And Final Inspection Of The Construction Contractors Completed Work, The Contractor Shall Provide Daily Punch List Inspection And Contract Closeout Reports With Observations, Findings, And Recommendations. Reports Shall Be Submitted To The Usace Assigned Project Engineer Within 1 Working Day From Date Of The Inspection. xxi. The A-e Shall Input Data, Using The Usace Rms Program, To Maintain Project Awareness, Electronic Documentation Of Memo's, Reports, Drawings, Contractual Instruments, And Other Project Information. f. Preparation Of Site Condition Reports And Testing: i. Prepare Special Reports Pertaining Or Related To Unforeseen Site Conditions Not Indicated In Contract Documents. Reports Shall Be Submitted To The Usace Assigned Project Engineer Within 3 Working Day From Date Of The Inspection. ii. Obtain The Services Of A Certified Testing Laboratory, Including All Testing Equipment And Analysis As Required To Test For Hazard Materials (asbestos, Contaminated Soil, Lead, Pcb’s Etc.). Attain Contract Award Within 6 Weeks Of Confirming The Need For The Testing. g. Design And Engineering Services: i. Provide Design And Engineering Services Requiring Architectural, Civil, Structural, Geotechnical, Mechanical And Electrical; Specialties; Elevators, Fire And Life Safety, Security, Seismic, Accessibility (ada Requirements), Environmental, Certified Industrial Hygienist, Corrosion Control Analysis & Design, Cost Estimating, Geographic Information System (gis) Support, Interior Design, Acoustical And A Historic Preservationist For Modification To Existing And New Facilities. ii. Preparation Of Project Analysis And Investigative Reports, Conceptual Designs, Contract Documents (complete Or Abbreviated Plans And Specifications), Site Plans, Exterior And Interior Layouts And Designs, Interior Furnishings And Finish Schedules, Project Cost Estimating And Scheduling. iii. The Above Design Services Will Only Be Incidental To The Construction Management Services The A-e Will Be Performing And Will Only Be Performed To The Extent Required To Provide Solutions To The Field And To Provide Reach Back Support To Their Construction Management Personnel In The Field. Full Designs Will Not Be Required. h. Specialty Requirements: i. Requirements For Fire Protection Engineers Are Shown In The United Facilities Criteria Ufc 3-600-01. Use The Latest Publication Of Ufc 3-600-01 As Of The Posted Date Off This Announcement. ii. Requirements For Gis Technicians – Must Develop, Maintain, And Update Geographic Information System (gis) Databases; Obtain Data From City, State, Federal And Private Sources; Receive And Review Maps, Land Parcel Records And Engineering Documents. Identify Pertinent Gis Information And Convert Data Into Proper Gis Formats. Ensure Accuracy And Completeness; Enter Data Into Databases; And Update Essential Gis Layers And Databases. Create A Variety Of Maps And Gis Related Documents. Provide Expertise In Gis Hardware And Software Products. Provide Technical Support To Gis Users. At Least 5 Years Of The Above Gis Technician Experience With At Least A Bachelor’s Degree In Geographic Information Systems From An Accredited University. iii. Requirements For Gis Analyst – Shall Be Responsible For Engineering Support Relating To Resources And Facilities Support, Database Planning And Design, Systems Analysis And Design, Network Services, Programming, Conversion And Implementation Support, Network Services Project Support, Data/records Support, Autocad Proficiency And Its Interaction With Gis, And Other Computer Related Services. Contributes To The Completion Of Specific Programs And Projects With Frequent Customer Contact. Education And Experience: At Least 5 Years Of The Above Gis Analyst Experience With At Least A Bachelor’s Degree In Computer-aided Design Or Engineering Design Technology From An Accredited University. iv. Requirements For Commissioning Authority – Shall Either Be A Degreed Sr. Mechanical Engineer With A Minimum Of 10 To15 Years Of Experience In Mechanical Engineering With A Focus On Commissioning Of Hvac & Chiller Plants Systems. This Experience Is To Include But Not Be Limited To, Fire Protection Systems, Water Distribution Systems, Plumbing, Hydronics, Direct Digital Controls & Tab Of Mechanical Systems Or Be A Degreed Electrical Engineer With A Minimum Of 10 To 15 Years Of Experience, To Include, But Not Be Limited To Experience In Low Voltage Electricity, Lighting, Communications, Security, Fire Notification, Direct Digital Controls, And The Commissioning Of Electrical Systems. Both Disciplines Are To Have Experience Involving Military Type Construction Projects Such As Chiller Plants & Hospitals, Barracks, Dining Halls, Hangars, Fire Stations, Schools, Laboratories Etc., This Experience Must Extend Through At Least 10 Months Of Occupancy. v. Requirements For Corrosion Control Engineers – Shall Be Certified Or Licensed In Corrosion Control Of Buried Metal Pipes And Tanks, And Who Demonstrates Expertise In Analysis Of Corrosion Issues And The Design Of Corrosion Prevention Systems Including Cathodic Protection, Coatings For Industry, Inspection, Corrosion Testing, And Material Selection For Specific Chemical Resistance. 3. Selection Criteria: the Selection Criteria Are Listed Below In Descending Order Of Importance (first By Major Criterion And Then By Each Sub-criterion). criteria A Through E Are Primary Selection Criteria. criteria F Through G Are Secondary Selection Criteria And Will Only Be Used As Tiebreakers Among Technically Equal Firms. primary Selection Criteria: a. Specialized Experience And Technical Competence: i. The Experience Of Firm And Its Consultants Previously Listed In Section 2 Project Information Of This Announcement. ii. Experience In The Ability To Provide A Qa/qc Plan Indicating How The Prime Plans To Manage Their Team To Ensure That Quality Products Are Prepared. Demonstrate The Ability To Produce Quality Designs. Evaluation Will Be Based On The Firm's Design Quality Management Plan (dqmp) And Will Consider The Management Approach, Coordination Of Disciplines, Management Of Subcontractors And Quality Control Procedures. iii. Demonstrate Capability To Execute Multiple Task Orders Simultaneously. b. Professional Qualifications: Consideration Will Only Be Given To Firms That Assemble A Team Of In-house And/or Sub-contractors/consultants With A Professional Staff Consisting Of The Following Disciplines. note: Resumes Must Be Provided For All Project Personnel Identified Below. senior Project Personnel For Each Key Discipline Are To Be Registered Or Certified In Accordance With Industry Standards. For Danish/greenlandic Resumes, Denmark And/or Eur Ings (feani Registration) Equivalent Professional Registrations Or Certifications Are Acceptable In Place Of The P.e./r.a. Requirement. i. Project Manager (architect Or Engineer With R.a. And/or P.e. Required) ii. Quality Assurance Manager (based On The Firm’s Qa/qc Plan, Architect Or Engineer With R.a. And/or P.e. Required) iii. Construction Manager (p.e. Or R.a. Required) iv. Construction Project Engineer v. Construction Schedulers vi. Architecture (r.a Required) vii. Structural Engineering (p.e. Required) viii. Civil Engineering (p.e. Required) ix. Mechanical Engineering (p.e. Required) x. Electrical Engineering (p.e. Required) xi. Sanitary Engineer (p.e. Required) xii. Cost Engineering xiii. Fire Protection Engineering (p.e. Required) (see Paragraph 2h) xiv. Licensed Interior Designer xv. Certified Industrial Hygienist xvi. Lead/asbestos Abatement Inspector xvii. Environmental Engineer (p.e. Required) xviii. Commissioning Authority (see Paragraph 2h) xix. Corrosion Control Engineer (see Paragraph 2h) xx. Gis Technician (see Paragraph 2h) xxi. Gis Analyst (see Paragraph 2h) the Evaluation Will Consider Education, Registration, And Training And Overall And Relevant Experienced Using Information From Section E Of The Sf 330 Includes A Matrix In Section G Showing Experience Of The Proposed Lead Designers On The Projects Listed In Section F Of The Sf 330. c. Past Performance With Respect To Cost Control, Quality Of Work And Compliance With Performance Schedules, As Determined From References, Other Sources And Cpars. Letter Of Recommendation From Customers Addressing Your Firms Cost Control, Quality Or Work And Schedule Compliance Capabilities May Be Included In Section H Of The Sf 330. Letters Should Be For Projects Of A Similar Nature And Shall Be No Older Than Three Years To Be Considered. d. Capacity: in An Effort To Expedite The Selection Process The A-e’s Are Required To Demonstrate How They Will Complete The Work Within The Time Parameters Of The Project Given The Employee Capacity Of The Team. The Evaluation Will Consider The Availability Of An Adequate Number Of Personnel In All Key Disciplines. The Evaluation Will Look At Numbers Listed In Part Ii Of The Sf330 To Evaluate The Overall Capacity Of The Team. Include A Part Ii Form Of The Sf 330 For Each Firm And Each Office Of Each Firm That Is Part Of The Proposed Team. a-e’s Are Also Required To Demonstrate In Writing How They Will Be Able To Commit Qualified Construction Management Services Professionals To Field Assignments Within Three Weeks Of Any Task Order Award. e. Knowledge Of The Locality In The General Geographical Area Of Greenlandic Boundaries. The Evaluators Will Look At The Specific Experience Of The Listed Key Discipline Lead Designers (one Per Discipline) As Stated In Section E Of The Sf 330. secondary Selection Criteria: f. Geographic Proximity In Relation To Greenlandic Boundaries. g. Volume Of Work Previously Awarded To The Firm By The Department Of Defense, With The Object Of Effecting An Equitable Distribution Among Qualified A/e Firms. 4. Submission Requirements: interested Prime Firms Having The Capabilities To Perform These Services Must Submit Their Sf330 To Stephen Dibari By Email Stephen.dibari@usace.army.mil. Maximum File Size Is 25mb. If Overall Sf330 Is Larger Than 25 Mb, Please Break Up The File Into Smaller Separate Files. no Hard Copies Of Sf-330’s Will Be Required. Do Not Mail Sf-330’s (cd Or Hard Copies) To The Contract Specialist Nor To Stephen Dibari At 26 Federal Plaza. Doing So, Will Delay The Ae Selection/award Process. the Sf 330 Can Be Found By Searching For Sf330 On The Following Gsa Website: Https://www.gsa.gov/forms the Forms Can Be Downloaded In A .pdf File Type. Total Submittal Page Limitation Is 85 Pages. Section E Is Limited To 50 Pages. Section F Is Limited To 10 Pages (1 Page Per Project). Each Page Shall Be Numbered. Section Dividers, Front And Back Covers, Cover Letter And Part Ii Of The Sf 330 Do Not Count Towards Overall Page Limit. Tabloid Size Paper 11” X 17” Pages For Organizational Chart Or Other Graphics Will Count As One Page. Submittals Not Following These Instructions, May Not Be Evaluated By The Board. supplemental Information On The Sf 330 Is Posted On The Ny District Usace Website: Https://www.nan.usace.army.mil/business-with-us/engineering-division/ submittals Will Not Be Accepted After 2:00 Pm On The Response Date Shown In The Advertisement In The Https://sam.gov/. If The Response Date Falls On A Saturday, Sunday, Or A Federal Holiday, The Response Date Will Move To The Next Business Day. if A Pre-selection Meeting Is Required, Notifications Will Not Be Sent After Approval Of The Pre-selection. Notification Of All Firms Will Be Made Within Ten (10) Calendar Days After Selection Approval. In Addition To The Two (2) Items Listed Above, The Remaining Info On Release Of Information On Firm Selection Shall Be In Accordance With Uai Subpart 5.4 (usace Acquisition Instructions). interviews (discussions) Will Be Held With All The Most Highly Qualified Firms As Required By Far 36.602-3(c). All Firms Will Be Interviewed By The Same Method (telephone, Video Teleconference Or In Person). Firms Will Be Given Sufficient Advance Notice To Allow Representatives To Participate In The Interviews Or Presentations. All Firms Will Be Asked Similar Questions. The Questions Will Be Related To The Announced Selection Criteria Including But Not Limited To, Their Experience, Capabilities, Capacity, Organization, Management, Quality Control Procedures And Approach For This Project. firms Must Be Registered In The Following: Https://www.sam.gov

Perishable Products Export Control Board Tender

South Africa
Closing Date23 Aug 2024
Tender AmountRefer Documents 
Tender Id: PPECBFACLIM072024 | Appointment Of Qualified Deep Cleaning Service Providers For A Period Of 36 Months [3yrs] To Render Deep Cleaning To The Ppecb Limpopo Offices

United Nations International Childrens Emergency Fund - UNICEF Tender

Bangladesh
Closing Date17 Sep 2024
Tender AmountRefer Documents 
Details: For Carrying Out A Study On The Effectiveness Of Cpd Programme For The Primary Education Teachers In Bangladesh. & Terms Of Reference For Institutional Contract       Summary: Unicef Is Planning To Engage A Consulting Firm To Support The Directorate Of Primary Education (dpe) In Conducting An Effectiveness Study On The Continuous Professional Development (cpd) Programme And Training. Dpe Has Been Implementing A Number Of Training Programmes Under Cpd Provisions. As Per The Decision Of The 8th Joint Consultative Meeting (jcm) Of Pedp4, A Study Is To Be Conducted To Understand The Process Of Planning, Designing And Implementing As Well As To Analyse The Appropriateness Of Institutional Arrangements, Quality Assurance Mechanisms And Resources Invested For These Training Programmes. The Agency Will Serve As An Additional Hand To The Unicef Education Team For Effectively And Timely Completing The Assignment. Estimated Duration For The Study Is Ten Months.   Purpose The Purpose Of The Assignment Is To Support The Directorate Of Primary Education (dpe) In Planning, Designing And Carrying Out A Study On The Effectiveness Of Cpd Programme For The Primary Education Teachers In Bangladesh. The Findings Of The Study Are Expected To Inform The Next Sector Programme, Especially To Identify Areas For Further Strengthening The Overall Teacher Development Activities In Primary Education. Location The Assignment Will Be Based In Dhaka, But Field Travel Will Be Required For Data Collection. Estimated Duration Around 10 Months Technical Supervisor Of The Assignment Education Officer, Education Section             Background And Context Teachers, In Sufficient Number And With Required Qualification, Competency And Professional Readiness, Are The Most Crucial Input To Any Education System. If Teachers Are Not Trained, Nurtured And Supported Enough Throughout Their Career, There Will Always Be Capacity Gaps To Meet The Learning Demands Of Children Adequately And Effectively. No Education System Can Perform At The Optimum Expected Level And Ensure Student Learning, If Teachers Remain Weakly Prepared. Therefore, A Coherent And Well-planned Cpd System Should Be In Place That Is Appropriately Resourced And Responsive To The Existing And Emerging Capacity Development Needs Of Teachers, Their Educators And Supervisors. The Fourth Primary Education Development Programme (pedp4) (2018-2025) Is A Comprehensive Initiative Encompassing The Primary Education Sub-sector, Comprising All Essential Developmental Endeavours Within The Sector. Pedp4 Activities Are Categorized Into Three Components And 21 Sub-components. The Pedp4 Puts Emphasize On Developing Teachers’ Professional And Technical Capacity. The Sub-component 1.5 Is On Continuous Professional Development (cpd), Which Aims To “ensure That All Teachers And Teacher Educators Acquire The Requisite Professional Standards Through A Continuous Engagement In Professional Development Activities.” Achieving This Goal Is Possible With A Coherently Articulated System That Makes Professional Development The Norm. In Order To Realize This Vision, A Cpd Framework Was Developed In Year 1 (2018 – 2019) Of Pedp4. The Framework Encompasses All Types Of Teacher Professional Development Interventions With Review Of Current Training Curricula, Delivery Methods, Training Assessment And Monitoring Mechanisms And Implementation Of The Training Knowledge/skills At The Classroom Level. Guided By The Cpd Framework As Well As Based On The Needs, Dpe Provides Following Training Under Cpd Programme In Primary Education Sub-sector: Type Of Cpd Training[1] Target Group Academic Supervision Training Assistant Upazila/thana Education Officer (aueos/ateos) Induction Training For Newly Recruited Teachers Assistant Teachers (teaching At G1-g5) Induction Training For Newly Recruited Ppe Teachers Assistant Teachers For Pre-primary Education Leadership Training Headteachers Ict In Education Training All Teachers Need-based Sub-cluster Training All Teachers Curriculum Dissemination Training All Teachers Competency Based Item Development And Test Administration Training All Teachers Training Of Master Trainer In English (tmte) Selected Teachers/ Aueos/ateos As Master Trainers A 7-day Foreign Training Selected Teachers And Educators Send Training Two Teachers Per School Subject-based Training Core Subjects Bangla Assistant Teachers English Assistant Teachers Math Assistant Teachers Science Assistant Teachers Bangladesh And Global Studies Assistant Teachers Non-core Subjects Physical Education Assistant Teachers Arts And Crafts Assistant Teachers Music Assistant Teachers These Training Programmes Are Expected To Help Teachers To Continuously Develop Their Skills And Professional Capacities In Facilitating Effective Teaching-learning Process In Classroom. Dpe Develops/updates Manuals, Materials And Resource Books For Each The Above-mentioned Training Activity. Different Training Programmes Are Facilitated By Different Educators. Instructors At Primary Teachers’ Training Institutes And Upazila Resource Center (urc) Instructors Have The Main Responsibility Of Delivering These Training. The Need-based Sub-cluster Training Is Usually Conducted By The Assistant Upazila Education Officers. There Is A Yearly Training Calendar Prepared By Dpe With A Plan To Organize Different Types Of Cpd Programmes. The Current Study Has Been Planned To Look Into These Aspects, Especially Understand The Current Situation Of How The Cpd Training Programmes Are Planned And Implemented As Well As To Get An Insight Into The Extent To Which The Teachers Translate Their Learning In The Lesson Delivery In Schools.   Rationale / Purpose Of The Evidence Activity Data From The National Student Assessment (nsa) 2022[2] Indicates That Students Are Struggling To Meet The Expected Learning Levels, With Only About Half Of The Students Achieving Expected Competencies In Bangla And Just A Third In Mathematics In Grades 3 And 5. The Nsa Also Highlights The Significant Impact Of Teachers' Pedagogical Practices On Children's Learning. The Cpd Training Programs Aim To Help Teachers Continuously Enhance Their Skills And Professional Capacities, Thereby Facilitating An Effective Teaching-learning Process In The Classroom And Helping Students Achieve The Expected Learning Outcomes. However, There Is No Recent Studies Conducted To Understand How Effective The Cpd Programme Is In Imparting The Required Skills For Teachers. A Cpd Study Was Done During The First Year Of Pedp4 As A Part Of Developing The Cpd Farmwork.  The Development Of The Cpd Framework Based On The Cpd Study Was A Disbursement Linked Indicator (dli) (dli Target 3.2) Of Pedp4 In Year 1. As A Part Of The Process, All Dlis Are Verified To See Whether All Activities Are Completed As Per The Verification Protocol. The Verification Findings Are Documented In A Result Verification Report (rvr). The Rvr Of The Dli Target 3.2 Reported That The Cpd Study Mainly Looked Into The Current Situation And Cpd Needs. However, As Documented In The Rvr, The Study Had A Number Of Issues In Terms Of Internal Consistency, Relevance And Feasibility. The Rvr Recommended To Undertake A Comprehensive Cpd Effectiveness Study Taking The Global Experiences And Lesson Learnt Into Consideration. In Year 4 Of Pedp4, There Was Another Dli (dli Target 3.3) On The Implementation Of The Cpd Plan. Following The Verification Process, A Joint Consultative Meeting (jcm, 8th) Was Held On 27 March 2023 To Convey The Development Partners’ (dps) Assessment On The Verified Dli Targets. The Jcm Also Emphasized Conducting A Cpd Effectiveness Study, Which Was Agreed As One Of The Priority Actions In The Jcm Record Of Discussion (rod). Moreover, The Pedp4 Is Going To Be Completed In June 2025; And The Ministry Of Primary And Mass Education (mopme) Has Already Started The Discussion On The Next Sector Programme. This Design Of The Next Sector Programme Typically Includes Several Studies To Stocktake Overall Situation And Performance Of The Sector. The Findings Of The Studies Will Inform The Decisions On Different Aspects Of The Sector. The Cpd Effectiveness Study Can Be Considered As One Of The Design Studies That Will Contribute To How Teacher Development Interventions Will Be Strengthened In The Following Programme.   Objectives The Objective Of This Assignment Is To Support Dpe In Carrying Out A Study To Understand The Process Of Planning, Designing And Delivering The Cpd Training Programmes As Well As To Gather Evidence On The Extent To Which Teachers Are Able To Reflect Their Learning In Pedagogical Practices In Classroom. The Specific Objectives Of The Study Are To: Analyse The Relevance And Alignment Of Cpd Manuals And Materials With The National Priorities Around Teacher Development In Bangladesh; Understand The Process And Quality Of Training Delivery, Including The Training Strategies, Quality Assurance Mechanism And Adequacy Of Resources; Explore The Extent To Which The Teachers Are Able To Use Their Cpd Learning In Classroom Teaching Learning Process.   Scope The Agency Will Directly Work With Training Division And Other Respective Line Divisions Of Dpe And Unicef Team Throughout The Study Process. Collaboration With And Guidance From All Dps Will Also Be Critical In Conducting A Technically Sound Study And Producing A Comprehensive Study Report.  The Intension Is Not To Evaluate/assess The Impact Of Each Individual Training Programme Under Cpd, Rather To Analyse And Understand How The Cpd Interventions Are Planned, Designed And Delivered As Well As To See Whether The Cpd Programmes Are Aligned With The National Policies And Priorities And Responsive To The Teachers’ Capacity Needs. The Study Also Aims To Understand What Monitoring, And Quality Assurance Mechanisms Are In Place To Ensure Quality Delivery Of The Cpd Programmes. The Assignment Will Cover Three Main Aspects Of The Cpd Programmes. Following Is The Scope, Description Of Tasks, Expectations And Required Process Under The Assignment.   4.1. Alignment And Relevance Of Cpd Programme Reviewing The Policy Documents, Guidelines And Framework To Identify National Priorities And The Goals Around Teacher Development: Though Bangladesh Is Yet To Formulate A Teacher Policy Or Teacher Development Policy/framework, Different Other Policies, Plan And Documents Outline The Goals Of Teacher Development. The Agency Will Locate, Collect And Review All The Documents That Include Directions And Guidelines For Teacher Development. The Main Objective Of Reviewing The Documents Would Be To Generate National Priorities And Policy Directions For Teacher Development In Bangladesh. Followings Are The Indicative List Of Documents (these Are Not Limited) That Can Be Reviewed: Education Policy 2020 8th Five-year Plan Pedp4 Programme Document – Cpd Sub-component Revised National Curriculum Cpd Framework Result Verification Reports (rvrs) Of All Cpd Dli Targets Annual Sector Performance Report (aspr) Studies On Cpd Programmes In Bangladesh Major Relevant Policy Documents Reviewing The Cpd Curriculum, Manuals And Materials To Understand Their Alignment With National Priorities: The Next Step Would Be Reviewing The Manuals And Materials Of All Current Cpd Programmes Mainly To Do A Mapping Of The Competencies, Contents And Information Covered Wholistically By The Cpd Programmes In Primary Education. The Agency Will Also Identify The Training Strategies And Approaches Outlined The Cpd Manuals, Which Are Suggested To Be Used During Training Delivery. The Agency Will Use This Mapping To Analyse The Followings: I) Alignment Of The Cpd Programmes With National Priorities; Ii) Relevance With National Curriculum; Iii) Responsiveness To The Contemporary National And Global Needs For And Practices Of Teacher Development; Iv) Provisions For Capacity Building Of Supervisors And Educators; V) Adequacy And Completeness Of The Contents For Achieving The Expected Outcomes Of Each Cpd Training Programme; And Vi) Technical Soundness Of The Training Strategies And Approaches.   Mapping The Cpd Packages With Teachers’ Professional Standards (tps): As A Part Of Basic Training For Primary Teachers (btpt) [revised Dped], Dpe Has Developed And Approved The ‘teachers’ Professional Standards (tps)’ For Primary Teachers. The Tps Are A Set Of Competencies That A Primary School Teacher In Bangladesh Is Expected To Have. The Agency Will Conduct A Comparative Analysis Between The Competencies Of The Tps And Expected Outcomes Of Each Cpd Training. This Will Also Include An Analysis On Which Cpd Training Contributes To The Achievement Of Which Competencies Of Tps.   4.2. Quality Of Cpd Training Delivery Observing The Training Sessions: The Agency Will Collect The Annual Training Calendar From The Training Division Of Dpe As Well As Gather Information On Which Training Programmes Will Be Delivered During The Period When The Agency Will Plan For Data Collection. At The Same Time, The Agency Will Develop A Checklist Based On The National And Global Best Practices That Can Be Used During The Session Observation. The Checklist Might Include Indicators On: I) Quality Of Facilitation; Ii) Use Of Materials And Resources; Iii) Use Of Training Approaches And Strategies; Iv) Engagement Of Trainees; And V) Time Management. Analysing The Training Planning And Management Processes: The Agency Will Review And Analyse The Overall Process That Is Followed During The Planning And Management Of Cpd Training Programmes. This Will Include: I) Distribution Of Different Cpd Training Throughout The Year; Ii) Process Of Selection And Deployment Of Trainees; Iii) Frequency Of The Different Cpd Training; And Iv) Distribution Of Participation Of Teachers/trainees In Different Training Programmes. Understanding The Quality Assurance Mechanisms: It Is Also Important To Analyse And Understand The Mechanisms In Place For Ensuring The Quality Of Cpd Training Programmes. The Agency Will Discuss With Trainers, Related Sub-national Officials And Dpe Officials To Gather Information On All Quality Assurance Mechanism They Use During The Training Delivery. The Quality Assurance Mechanism Might Include Session Observation By Respective Officials, Feedback Gathering From The Trainers And Pre-test/post-test. The Agency Will Also Collect The Checklist Or Any Other Documents That Are Used For This Purpose. Understanding The Trainees’ Perception: The Agency Will Analyse And Understand The Perception Of The Trainees Mainly To Have An Insight Into: I) Quality Of The Contents And Delivery; Ii) Effectiveness Of The Cpd Training In Building The Expected Capacity; Iii) Overall Experience Of The Cpd Training; Iv) Additional Need For Capacity Development; And V) Challenges They Face During Participation In The Training Programmes. Analysing The Process And Adequacy Of Resources Allocation And Facilities: This Step Includes Mainly Two Aspects. Firstly, The Agency Will Look Into The Fund Allocation And Disbursement Process For Cpd Training. This Will Also Include Fund Disbursement Channel, Sufficiency Of Funds For Different Training Programmes, Timeliness Of The Fund Disbursement To The Field And Effectiveness Of Fund Utilization. Secondly, It Is Also Important To Analyse Adequacy And Suitability Of The Resources In Venue Where The Cpd Training Typically Takes Place. Most Of The Cpd Training Usually Takes Place Either In Pti Or Urc. For This, The Agency Will Use A Checklist That Identifies Resources And Facilities Necessary In A Training Venue To Ensure Effective Training Delivery.    4.3. Reflection Of Cpd In Classroom Observing The Classroom Lessons: The Agency Will Observe A Selected Number Of Lessons At The Government Primary Schools, Mainly To Understand The Reflections Of Cpd Training In The Teaching Learning Process. For Effectively Observing The Lessons, The Agency Will Develop A Checklist Covering The Important Aspects Of Effective Pedagogical Practices In Classroom. This Might Include, But Not Limited To: I) Lesson Plan; Ii) Use Of Materials; Iii) Engagement Of The Learners; Iv) Use Of Teaching-learning Strategies (e.g. Q/a, Group Work, Pair Work Etc.); V) Assessment. Understanding The Academic Support System: A Review And Analysis Of The Existing Academic Support To The Teachers Will Also Be Conducted. The Agency Will Have Discussions With Teachers, Headteachers And Supervisors To Have A Comprehensive Understanding The Academic Support System, Including: I) Who Are The Supervisors; Ii) Frequencies Of Academic Support Activities (lesson Observation, Supervision And Mentoring); Iii) How Supervisors Record The Findings From Supervision; And Iv) What Are The Strategies/approaches They Follow To Support Teachers. Analysing The Challenges Teachers Face In Applying The Cpd Learnings: The Agency Will Also Gain An Insight Into The Challenges Teachers Face In Applying The Cpd Learnings In Their Lessons, Especially In Terms Of The Availability Of Materials, Learning Environment And Facilities In Classroom, Support Form Headteachers And Colleagues, Workload And So On. It Might Also Include How Teachers’ Participation In Different Training Programmes Affect The Student Contact Hours In School.  In Addition To Above-mentioned Tasks, The Agency Is Expected To Maintain Effective Communication And Coordination With All Involved In The Process. All The Activities Under This Assignment Will Be Accomplished In Collaboration With The Training Division Of Dpe, With Technical Support From Unicef And Other Development Partners. Frequent Communication With Responsible Dpe Officials Will Have To Be Maintained Throughout The Process Of Accomplishing This Assignment. All The Documents And Materials Submitted By The Expert Will Be Reviewed Both By Dpe, Unicef And Other Dps. The Agency Is Expected To Attend Review And Coordination Meetings Related To This Assignment And Make Presentations If And When Required. It Is Also Expected That The Agency Will Prepare Meeting Minutes Within 2 Days After Each Meeting And Share With Dpe And Unicef.   Study Questions As Mentioned, The Study Relates To Three Major Aspects Of Cpd. Followings Are The Specific Questions Under Each Of The Aspects. Firstly, Analysing The Relevance And Alignment Of The Cpd Programmes With National Policies, Priorities, Framework And Standards Pertaining To Teacher Development, Through Following Guiding Questions: A.1. What Are The Available Policy Documents, Framework And Guidelines That Outline The Goals, Priorities And Strategies For Teacher Development In Bangladesh? A.2. How Well Are The Current Cpd Programme Objectives Aligned With And Responsive To The Goals Of Teacher Development And Overall Priorities In The Sector? A.3. To What Extent Are The Current Cpd Programmes Relevant To The Revised Curriculum And Contemporary National And Global Needs For And Practices Of Teacher Development? A.4. How Comprehensive Are The Cpd Programmes In Terms Of Developing Capacity Not Only Of Teachers But Also Of The Educators And Supervisors? A.5. To What Extent Do The Current Cpd Programmes Cover The Contents And Skills Necessary For Achieving The Teachers’ Professional Standards? A.6. To What Extent Are The Contents, Texts And Information Set Out In The Manual And Resource Book Of Each Cpd Training Programme Adequate And Complete For Achieving The Expected Outcomes Of Each Cpd Training Programme? A.7. How Well Are The Training Strategies And Approaches Outlined In The Cpd Manuals Technically Sound And Appropriate?   Secondly, Understanding The Quality Of Training Delivery, Including The Quality Assurance Mechanism, Resources And Perception Of The Trainees, Through Following Guiding Questions: B.1. To What Extent Are The Cpd Training Sessions Useful In Terms Of The Delivery Of The Contents, Use Of Materials And Resources, Use Of Training Approaches And Strategies, Engagement Of Trainees And Time Management? B.2. What Quality Assurance Mechanism (monitoring, Session Observation, Feedback Etc.) Are In Place To Ensure That The Training Sessions Are Of The Expected Quality? B.3. How Do The Trainees Perceive The Usefulness And Relevance Of The Content, Delivery, And Overall Experience Of The Cpd Training? B.4. How Adequate Are The Resources And Facilities Available In The Training Venues (pti, Urc And Others) For Conducting Effective Training Sessions? B.5. What Is The Trainee Selection Mechanism And How Rational Is The Distribution Of Participation Of Trainee In Different Training Programmes? B.6. How Evenly Are The Cpd Trainings Distributed Throughout The Financial Year As Per Dpe’ Yearly Training Calendar? B.7. How Rational And Adequate Is The Current Frequency Of Different Cpd Training? B.8. How Adequate And Enabling Is The Fund Allocation And Disbursement Mechanism In Terms Of The Sufficiency Of Funds For Different Training Programmes, Timeliness Of The Fund Disbursement To The Field And Efficiency Of Fund Utilization?   Thirdly, Exploring The Reflection Of Cpd In Classroom Teaching Learning Process, Including Academic Support System And Enabling Environment At School, Through Following Guiding Questions: C.1. To What Extent Are The Learnings From Different Cpd Programme Contributing To Improved Pedagogical Practices Of Teachers In The Classroom? C.2. How Responsive Is The Academic Support System (lesson Observation, Supervision And Mentoring Etc.) To The Teachers’ Needs For Ensuring Improved Teaching-learning Practices? C.3. How Do The Supervisors Record The Findings From Lesson Observation And School Monitoring And How Are The Findings Communicated/shared With Teachers? C.4. What Challenges Do The Teachers Face In Applying The Cpd Learnings In Their Lessons In Terms Of Facilities Inside The Classroom, Support From Co-workers And Headteachers And Enabling Environment At School? C.5. How Does The Teachers’ Participation In Different Training Programmes Affect The Student Contact Hours In School?   Methodology Based On The Above Descriptions In Section 4 As Well As To Respond To The Guiding Questions Outlined Under Section 5, The Agency Is Expected To Propose Technically Sound Methodology That Will Include: I) Study Approach; Ii) Sampling Method; Iii) Data Collection Methods; Iv) Respondents; V) Data Entry And Analysis Process; Vi) Reporting Approach; And Vii) Quality Assurance Mechanism. The Study Methodology And Other Details Are To Be Included In The Inception Report. The Proposed Methodology Will Be Agreed And Finalized Based On The Discussion With Dpe, Unicef And Other Development Partners. Followings Are The Indicative/suggestive Methodology For This Study: Study Approach: The Study Will Employ A Mixed Method Of Data Collection And Analysis, Combining Both Quantitative And Qualitative Approaches. The Mixed Method Will Allow A Deeper Exploration Of The Issues Around Cpd By Utilizing A Blend Of Qualitative And Quantitative Data. Following Is A Summary Of Proposed Methods For Data Collection, Including The Respondents And Questions To Be Responded Through Each Method.   Proposed Methods Suggested Respondents/ Documents/ Locations Questions To Be Responded Qualitative Desk Review All Documents Listed Under Sub-section 4.1 A.1, A.2, A.3, A.4, A.5, A.6, A.7, B.2, B.5, B.6 And B.8 Kii Central, Division And District Level Officials A.3, A.4, A.5, B.6, B.8 And C.2 Fgd/in-depth Interview Trainers And Educators (pti And Urc) And Upazila Level Supervisors A.3, A.4, A.5, A.6, A.7, B.2, B.4, B.5, B.6, B.7, B.8, C.2, C.3 And C.5 Quantitative Questionnaire/ Opinionnaire School Teachers A.3, B.3, B.7, C.1, C.4 And C.5 Observation Cpd Training Sessions, Classroom Lessons B.1, B.2 And C.1 Resource Adequacy Analysis Pti And Urc And Other Training Venues B.4 The Agency Is Expected To Prepare The Data Collection Tools For Each Method Considering The Data Required For Responding To The Questions. It Is Recommended That The Agency Will Include Drafts Of The Tools In The Inception Report. The Tools Will Be Finalized Based On The Thorough Discussion With Dpe, Unicef And Other Development Partners. Sampling: The Sampling Will Follow A Blend Of Stratified - To Ensure That Respondents Of All Levels Are Included - And Purposive – To Ensure That The Intended Purpose Of Data Collection Is Achieved. The Sample Size Will Not Have To Be Nationally Representative But Adequate To Present The Findings Reliably And Confidently. At The Same Time, It Is Important To Ensure That Respondents/schools Are Selected From All Eight Administrative Divisions. For Observing The Training Sessions, Dpe’s Training Calendar Will Be The Guiding Document. Training Programmes That Would Be Delivered During The Time Of Data Collection Will Be Included In The Sample. The Agency Is Expected To Propose The Appropriate Sampling Method And Number Of Respondents And Lessons To Be Observed. These Will Be Finalised Based On The Discussion With Dpe And Unicef. Risks And Limitations: Following Are The Risks And Limitations Anticipated: The Study Is Not Planned To Be Nationally Representative. Therefore, It Might Be Challenging To Draw The Conclusion From The Findings With Full Confidence. Dpe Has A Yearly Training Calendar For Delivering Training Throughout The Year. Also, Some Training Happens Only Once In 3-4 Year Period. It Means The Study Cannot Observe The Sessions Of All The Training Programmes, It Can Cover The Programmes That Are Conducted During The Time Of Data Collection. The Study Does Not Intend To Assess Or Evaluate The Cpd Training Programmes, Rather It Aims To Analyse, Understand And Document The Current Processes, Mechanisms And Institutional Practices. For This Reason, The Findings Will Not Infer To The Effectiveness Of Each Training.   Ethical Considerations Agency Contracted For The Study Is Expected To Follow The Ethical Principles And Considerations Outlined In The United Nations Evaluation Group (uneg) Ethical Guidelines For Evaluation And The Unicef Procedure For Ethical Standards In Research, Evaluation And Data Collection And Analysis. In Addition, The Uneg Norms And Standards Will Be Observed. As Per Unicef Standards For Ethical Research, The Agency Must Give Special Attention To Ethical Considerations And Should Put In Place Adequate Measures For Ethical Oversight Throughout The Study/evaluation Period. All Researchers And Field Investigators Involved In Primary Data Collection Should Have Undergone Basic Ethics Training, Which At A Minimum Includes Completing Unicef’s Agora Course On Ethics In Evidence Generation Or Its Equivalent. In Conducting The Study, The Agency Must Ensure Informed Consent, Respecting People’s Right To Provide Information In Confidence And Making Study Participants Aware Of The Scope And Limits Of Confidentiality. Furthermore, The Agency Is Responsible For Ensuring That Sensitive Information Cannot Be Traced To Its Source So That The Relevant Individuals Are Protected From Reprisals.  Data Storage And Security Must Be Ensured At All Stages Of The Study. Only Selected Personnel From The Research Agency Should Have Access To De-identified Data, And Only Anonymised Data Should Be Shared Externally, And With Unicef (unless Stated Otherwise).   Use Of Findings As Mentioned, Though Cpd Training Has Been Implemented For Long, There Is No Solid Study Or Evidence That Analyses And Documents The Cpd Planning, Design, Implementation And Institutional Arrangement. One The Other Hand, Mopme Has Started Designing The Next Sector Programme In Primary, And Needless To Say, Teacher Capacity Development Is Envisaged As One Of The Important Components Of The Programme. For These Perspectives, The Findings Of The Study Will Be Used In Following Two Processes: Updating The Cpd Programmes: Based On The Findings, Dpe Will Update, Revise And Further Strengthen The Cpd Training Manuals, Materials, Quality Assurance Mechanisms, Alignment And Relevance Of The Training. Strengthening Cpd Provisions In The Next Sector Programme: The Study Will Also Inform The Critical Decisions About The Cpd Provisions For The Next Sector Programme, Institutional Arrangements, Capacity Building Of Educators And Supervisors, Fund Disbursement And Utilization And Training Management.   Publication Plan The Study Report Will Be Shared With Dpe And All Development Partners In The Sector. Dpe Will Disseminate The Findings Through Workshops, As Well As Circulate The Report By Uploading It Onto Its’ Website. However, At His Point, There Is No Plan To Publish The Report Through Any National Or International Journals.   Schedule Of Deliverables, Timeline And Payment   Sl# Deliverables Timeline (total 8 Months) Payment 01 An Inception Report/work Programme Detailing Methodologies And Data Collection Approaches To Be Used, Implementation Timeline And Approaches For Consultation And Reporting. August 2024 10% Of The Contract Value 02 A Document Review Report (to Be Part Of The Study Report) With A Complete Overview Of National Teacher Development Priorities, Current Cpd Provisions In Bangladesh Including A Mapping Of Cpd With Tps. September 2024 15% Of The Contract Value 03 Finalized Data Collection Tools Including Data Collection Plan, Timeline And Type Of Respondent To Be Engaged. October 2024 20% Of The Contract Value 04 Draft Cpd Effectiveness Study Report, With A Presentation, A Briefing Note (not More Than 5 Pages) Highlighting The Key Findings From The Study For Sharing And Facilitating Reviews With The Stakeholders January 2025 25% Of The Contract Value 05 Final Cpd Effectiveness Study Report That Incorporates Feedback And Suggestions From Dpe, Development Partners And Other Stakeholders. March 2025 30% Of The Contract Value   Team Composition, Qualifications & Experience Required General Requirement Of The Agency:   A National Agency With Minimum Of 10 (ten) Years Of Experience Around Educational Research And/or Teacher Development.  The Agency Should Have Implemented Or Ongoing 3 (three) Contracts Of Similar Nature With Organizations/ Companies Of Similar Magnitude And Complexity. Experience Of Working With Government Counterparts And Understanding Of Government System And Process. Previous Experience Of Working With Education Directorates, And National And Sub-national Education Stakeholders, Especially With Educators, Supervisors And Teachers. Proven Experience Of Planning, Delivering, Managing And Organizing Capacity Development Programmes, Preferably For Teachers. Proven Experience In Quantitative And Qualitative Study And Research. Demonstrated Prior Experience In Preparing Interactive Study Reports With Visualization And Infographics. Strong Analytical Written Skills, Including The Ability To Write In An Engaging And Informative Manner And Clearly Synthesize Information. Previous Collaboration Experience With Unicef Preferred, But Not Mandatory.    Team Composition And Expertise: The Agency Will Assemble A Team With Adequate Experts Who Have All Necessary Skills For Effectively Conducting The Study. It Is Expected That The Team Will Include At Least One International Expert Who Will Bring Global Cpd Perspectives As Well As Ensure The Technical Soundness Of The Study Design And Support In Producing High Quality Study Report. The Key Considerations In Assembling The Team Should Include A Right Balance Of Technical And Operational Skills; Drawing The Right Technical Expertise As Per The Requirements Of The Assignment; Assembling The Most Suitable National Expertise With Deeper Contextual Understanding And Tacit Knowledge Of Ground Realities In Bangladesh And A High Concern For Ensuring Value For Money. The Agency Is Expected To Propose The Adequate Number Of Experts In The Team. However, The Team Should Possess Following Expertise: Team Leader/research Manager: The Team Should Include One Team Leader Or Research Manager Who Will Oversee The Whole Study Process. S/he Should Have Minimum Master’s Degree In Relevant Field And Minimum 15 Years Of Experience In Managing Large-scale Study, Preferably With Experience In Teacher Development In Bangladesh. The Team Leader Can Be National Or International. Qualitative And Quantitative Research Expert(s): The Team Should Have Expert(s) Who Have Proven Track Records In Both Research Paradigms: Qualitative And Quantitative. The Expert(s) Should Have Minimum Master’s In Research, Statistics Or Relevant Field, And Minimum Of 10 Years Of Experience In Education/research. Data Analyst(s): The Team Should Comprise Experts Who Have Deep Technical Knowledge And Understanding Of Data Analysis For Both Qualitative And Quantitative Research Paradigms. The Data Analyst(s) Should Have Minimum Of Masters In Psychometrics, Statistics Or Relevant Field And Minimum 8 Years Of Experience In Data Analysis. Report Writing Expert(s): The Team Should Also Include Experts Who Have Proven Experience Of Writing Interactive Reports With Adequate Technical Details And Visualization. The Report Writing Expert(s) Should Have Minimum Of Masters In Experience In Teacher Development, Education And Research And Minimum 10 Years Of Experience In Educational Study Design And Report Writing, Preferably In The Area Of Teacher Development. The Report Writing Expert(s) Can Be National Or International. Enumerators: The Agency Will Assemble A Team Of Enumerators Who Have Previous Experience Of Data Collection, Especially In The Education Context. The Enumerators Should Have Solid Expertise In Facilitating Discussions, Interviews And Consultations With The Research Respondents. Experience Of Consultation With Government Officials Will Be Expected. The Agency Will Propose Adequate Number Of Enumerators Based On The Sample Size And Scope Of Data Collection.   Duty Station The Agency Will Work Mainly Based In Dhaka, With Frequent Communication With Dpe And Unicef. Data Collection Will Require Travelling To Division And District-level Offices, Training Venues At District And Upazila Level, And Schools. For Meetings, Workshop And Consultation With Government Counterpart, The Designated Agency Officials Will Have To Travel To Mopme And Dpe.   Management And Supervision Dpe: As Mentioned, Unicef Will Be Supporting Dpe In Carrying Out The Study. Therefore, Dpe Will Provide Overall Guidance And Directions To Conduct The Study. All The Documents, Including The Inception Report, Data Collection Tools And Study Report Will Be Endorsed By Dpe. Besides, Dpe Will Support The Agency In Accessing All The Documents, List Of Schools And Training Centres, And Officials For Sampling Purposes. Once Sampled, Dpe Will Also Support In Reaching Out The Respective Officials To Facilitate Data Collection Process. Unicef: Unicef Will Serve As The Technical Lead Of The Study. All Deliverables Will Be Reviewed By Designated Officials Of The Education Section Before Sharing With Dpe. Unicef Will Also Facilitate The Discussions, Correspondences And Consultations Between Dpe And The Agency. Unicef Supply Section Will Remain The Focal Point For All Administrative, Financial And Commercial Queries And Correspondence, Including Contract Amendment.   Technical Evaluation Criteria   Category Points Relevance And Alignment Of The Proposal (05) Understanding Of, And Responsiveness To, Unicef Bangladesh Office Requirements. 02 Understanding Of Scope And Objectives Of The Tor And Completeness Of Response. 02 Overall Concord Between Study Requirements And The Proposal. 01 Appropriateness Of Methodology And Timeline (35) Quality And Technical Soundness Of The Proposed Approach And Methodology. 10 Appropriateness Of The Approach: To What Extent The Methodology Is Designed In Response To The Requirements Of The Tor. 10 Quality Of Proposed Implementation Plan, I.e., How The Agency Will Undertake Each Task, And Process Of Completing The Tasks. 05 Risk Assessment - Recognition Of The Risks/peripheral Problems And Methods To Prevent And Manage Risks/peripheral Problems. 05 Feasibility Of Timelines Proposed. 05 Organisational Capacity And Proposed Team (30) Professional Expertise Of The Firm/company/organization, Knowledge And Experience With Similar Projects, Contracts, Clients And Consulting Assignments. 10 Team Leader: Relevant Experience, Qualifications, And Position With The Agency. 10 Team Members: Relevant Experience, Skills & Competencies. 05 Adequacy And Organization Of The Team, I.e., How Sufficient The Number Of Team Members And Composition To Fulfil The Roles & Responsibilities. 05 Total Points 70 For This Rfp, The Technical Proposal Has A Total Score Of 70 Points. Bidders Must Score A Minimum Of 49 Points To Be Considered Technically Compliant And In Order For The Financial Proposals To Be Opened. Financial Proposal Has A Total Score Of 30 Points. The Technical Proposal Must Comprehensively Address Each Deliverable, Outlining A Detailed Plan To Achieve Them Within The Specified Timeframe. Each Deliverable Should Be Clearly Defined, With Corresponding Strategies, Methodologies, And Timelines For Implementation. The Proposal Should Demonstrate A Thorough Understanding Of The Project Objectives And How The Proposed Approach Will Effectively Meet Them. Also, The Proposal Should Highlight Any Innovative Or Unique Aspects Of The Proposed Methodology That Will Contribute To The Project's Success. In Addition To The Technical Proposal, A One-page Curriculum Vitae (cv) Of All Team Members Must Be Submitted Along With A Recent Photo. The Cv Should Provide A Concise Overview Of Each Team Member's Qualifications, Expertise, And Relevant Experience. Furthermore, It Should Include Contact Information For Two Referees - One Professional And One Academic - Who Can Attest To The Applicant's Capabilities And Suitability For The Project. The Final Selection Of The Bidder Will Be Based On A Quality And Cost Basis As Specified In The Rfp.     [1] These Trainings Are Provided In Different Frequencies Based On The Needs. [2] Directorate Of Primary Education [dpe]. (2023). The National Student Assessment 2022: Grades 3 And 5. Https://www.dpe.gov.bd/site/publications/8fedb608-0b49-4935-bf2d-9e15a3b66525/nsa-2022-final-report

STATE, DEPARTMENT OF USA Tender

Electrical and Electronics...+1Electrical Works
United States
Closing Date31 May 2024
Tender AmountRefer Documents 
Details: I. Description the American Embassy In Conakry, Guinea Requires Preventive Maintenance Services For Chancery Switchgears, Demarc Mv Switch, Pme Pad Mounted Gear Switch And High Voltage Transformers At Chancery. These Services Shall Result In All Systems Being Serviced Under This Contract Being In Good Operational Condition When Reactivated. ii. Performance Work Statement this Is A Firm Fixed Price Contract Payable Entirely In Us Dollars (usd). Prices For All Contract Line-item Numbers (clin) Shall Include Proper Disposal Of Toxic Substances As Per Item 8.4 Where Applicable. No Additional Sums Will Be Payable For Any Escalation In The Cost Of Materials, Equipment Or Labor, Or Because Of The Contractor's Failure To Properly Estimate Or Accurately Predict The Cost Or Difficulty Of Achieving The Results Required. The Contract Price Will Not Be Adjusted Due To Fluctuations In Currency Exchange Rates. the Contract Will Be For A Period Of One-year, With A Maximum Of Three, One-year Options; And Will Be Expected To Commence From The Date Of Notice To Proceed. iii. Pricing the Rates Below Include All Costs Associated With Providing Preventive Maintenance Services In Accordance With The Attached Scope Of Work, And The Manufacturer’s Warranty Including Materials, Labor, Insurance (see Far 52.228-4 And 52.228-5), Overhead, Profit And Gst (if Applicable). iv. Value Added Tax value Added Tax. Value Added Tax (vat) Is Not Applicable To This Contract And Shall Not Be Included In The Clin Rates Or Invoices Because The U.s. Embassy Has A Tax Exemption Certificate From The Host Government. 1. Base Year. The Contractor Shall Provide The Services Shown Below For The Base Period Of The Contract And Continuing For A Period Of 12 Months. clin description quantity Of Equipment type Of Services no. Of Service unit Price / Service ($) total Per Year ($) 101 switch Medium Voltage Demarc, 20kv Sm6 1 semi-annual 2 102 switch Medium Voltage Isolation, 20kv Pme-5 1 semi-annual 2 103 transformer 20kv/400 V – 2500 Kva (chancery) 1 semi-annual 2 104 nec Switchgears 1 annual 1 105 switchboard 1 annual 1 106 switchboard 1 annual 1 107 switchboard 1 annual 1 107 defense Base Act (dba) 1 annual 1 total Base Year 2. Option Year 1. The Contractor Shall Provide The Services Shown Below For Option Year 1 Of The Contract And Continuing For A Period Of 12 Months. clin description quantity Of Equipment type Of Services no. Of Service unit Price / Service ($) total Per Year ($) 101 switch Medium Voltage Demarc, 20kv Sm6 1 semi-annual 2 102 switch Medium Voltage Isolation, 20kv Pme-5 1 semi-annual 2 103 transformer 20kv/400 V – 2500 Kva (chancery) 1 semi-annual 2 104 nec Switchgears 1 annual 1 105 switchboard 1 annual 1 106 switchboard 1 annual 1 107 switchboard 1 annual 1 107 defense Base Act (dba) 1 annual 1 total Base Year 3. Option Year 2. The Contractor Shall Provide The Services Shown Below For Option Year 2 Of The Contract And Continuing For A Period Of 12 Months. clin description quantity Of Equipment type Of Services no. Of Service unit Price / Service ($) total Per Year ($) 101 switch Medium Voltage Demarc, 20kv Sm6 1 semi-annual 2 102 switch Medium Voltage Isolation, 20kv Pme-5 1 semi-annual 2 103 transformer 20kv/400 V – 2500 Kva (chancery) 1 semi-annual 2 104 nec Switchgears 1 annual 1 105 switchboard 1 annual 1 106 switchboard 1 Annual 1 107 switchboard 1 annual 1 107 defense Base Act (dba) 1 annual 1 total Base Year 4. Total For All Years: Base Year $__________ Option Year 1 $__________ Option Year 2 $__________ Total $__________ 5. Repair Option. Repairs Are Not Included Under This Agreement (see 7.1.3) And Are To Be Done Outside This Contract. However, We Would Like To Have Current Labor Rates In The Event That There Is An Issue Discovered During The Preventive Maintenance Of The Specified Equipment. Please Provide Your Current Labor Rates In The Repair Option Fields Below. As Stated In 7.1.3 Any Necessary Repairs Or Parts Will Be Submitted For Approval And Then Billed Against A Separate Po. The Contractor Is Not Approved To Do Any Additional Work Without Approval. repair Labor Rates Base Year $__________/hr Option Year 1 $__________/hr Option Year 2 $__________/hr 6. Notice To Proceed after Contract Award And Submission Of Acceptable Insurance Certificates And Copies Of All Applicable Licenses And Permits, The Contracting Officer Will Issue A Notice To Proceed. The Notice To Proceed Will Establish A Date (a Minimum Of Ten (10) Days From Date Of Contract Award Unless The Contractor Agrees To An Earlier Date) On Which Performance Shall Start. description/specification/work Statement 1.0 Equipment And Performance Requirements 1.1. The American Embassy In Conakry, Guinea Requires The Contractor To Maintain The Following Systems In A Safe, Reliable, And Efficient Operating Condition. Please See Equipment List For A More Detailed Description. nec Switchgears Square D Qed (3) switch Board Qed 4000 A (2) switch Board Qed 200 A (1) switch Board Qed 1200 A (1) transformer 20kv/400v – 2500 Kva (cooper Power System) demarc Mv Switch, 20kv, Sm6-cm 400a, 50hz, Iec 62271-200, Merlin Gerin mv Switch, 20kv Back Of Gen Room, S&c Pme Pad-mounted Gear Switch 1.2. The Contractor Shall Provide All Necessary Managerial, Administrative And Direct Labor Personnel, As Well As All Transportation, Equipment, Tools, Supplies And Materials Required To Perform Inspection, Maintenance, And Component Replacement As Required To Maintain The Systems In Accordance With This Work Statement. Under This Contract The Contractor Shall Provide: the Services Of Trained And Qualified Technicians To Inspect, Adjust, And Perform Scheduled Preventive Maintenance; And Provide Consumable Materials. 1.3. Performance Standards the Generators Shall Always Be Ready To Provide Emergency Power During Normal Working Hours In The Event Of City Power Failure. The Contractor Shall Schedule All Preventive Maintenance Work With The Site Facility Manager To Avoid Disrupting The Business Operation Of The Embassy. 2.0 Hours Of Performance 2.1. The Contractor Shall Maintain Work Schedules. The Schedules Shall Take Into Consideration The Hours That The Staff Can Effectively Perform Their Services Without Placing A Burden On The Security Personnel Of The Post. The Contractor Shall Deliver Standard Services Between The Hours Of 8:00 Am And 5:00 Pm Monday Through Thursday And 08:00 Am To 12:00 Noon Friday. No Work Shall Be Performed On Us Government And Local Holidays. Scheduled Power Outages To Be Performed Only Saturday. access To Government Buildings And Standards Of Conduct 3.1 General. The Contractor Shall Designate A Representative Who Shall Supervise The Contractor’s Technicians And Be The Contractor’s Liaison With The American Embassy. The Contractor’s Employees Shall Be On-site Only For Contractual Duties And Not For Any Other Business Or Purpose. Contractor Employees Shall Have Access To The Equipment And Equipment Areas And Will Be Escorted By Embassy Personnel. 3.2 Personnel Security. The Government Reserves The Right To Deny Access To U.s.-owned And U.s.-operated Facilities To Any Individual. The Contractor Shall Provide The Names, Biographic Data And Police Clearance On All Contractor Personnel Who Shall Be Used On This Contract Prior To Their Utilization. Submission Of Information Shall Be Made Within 5 Days Of Award Of Contract. No Technician Will Be Allowed On Site Without Prior Authorization. Note: This May Include Cleared Personnel If Advance Notice Of Visit Is Not Given At Least One Week Before The Scheduled Visit. 3.2.1 Vehicles. Contractor Vehicles Will Not Be Permitted Inside The Embassy Compound Without Prior Approval. If You Need To Have Vehicle Access, Please Submit Your Vehicle Information (make, Model, License Plate #) Along With A Written Justification As To Why Access Is Necessary. This Should Be Submitted To The Contracting Officer Representative (cor) At Least One (1) Day Prior To The Visit. 3.2.2 Government Shall Issue Identity Cards To Contractor Personnel, After They Are Approved. Contractor Personnel Shall Always Display Identity Card(s) On The Uniform While Providing Services Under This Contract. These Identity Cards Are The Property Of The Us Government. The Contractor Is Responsible For Their Return At The End Of The Contract, When An Employee Leaves Contractor Service, Or At The Request Of The Government. The Government Reserves The Right To Deny Access To U.s.-owned And U.s.-operated Facilities To Any Individual. 3.3. Standards Of Conduct 3.3.1 General. The Contractor Shall Maintain Satisfactory Standards Of Employee Competency, Conduct, Cleanliness, Appearance, And Integrity And Shall Be Responsible For Taking Such Disciplinary Action With Respect To Employees As May Be Necessary. Each Contractor Employee Shall Adhere To Standards Of Conduct That Reflect Credit On Themselves, Their Employer, And The United States Government. The Government Reserves The Right To Direct The Contractor To Remove An Employee From The Worksite For Failure To Comply With The Standards Of Conduct. The Contractor Shall Immediately Replace Such An Employee To Maintain Continuity Of Services At No Additional Cost To The Government. 3.3.2 Uniforms And Personal Equipment. The Contractor's Employees Shall Wear Clean, Neat And Complete Uniforms When On Duty. All Employees Shall Wear Uniforms Approved By The Contracting Officer's Representative (cor). The Contractor Shall Provide, To Each Employee And Supervisor, Uniforms And Personal Equipment. The Contractor Shall Be Responsible For The Cost Of Purchasing, Cleaning, Pressing, And Repair Of The Uniforms. 3.3.3 Neglect Of Duties. Neglect Of Duties Shall Not Be Condoned. This Includes Sleeping While On Duty, Unreasonable Delays, Or Failures To Carry Out Assigned Tasks, Conducting Personal Affairs During Duty Hours And Refusing To Render Assistance Or Cooperate In Upholding The Integrity Of The Worksite Security. 3.3.4 Disorderly Conduct. The Contractor Shall Not Condone Disorderly Conduct, Use Of Abusive Or Offensive Language, Quarreling, And Intimidation By Words, Actions, Or Fighting. Also Included Is Participation In Disruptive Activities That Interfere With Normal And Efficient Government Operations. 3.3.5 Intoxicants And Narcotics. The Contractor Shall Not Allow Its Employees While On Duty To Possess, Sell, Consume, Or Be Under The Influence Of Intoxicants, Drugs Or Substances Which Produce Similar Effects. 3.3.6 Criminal Actions. Contractor Employees May Be Subject To Criminal Actions As Allowed By Law In Certain Circumstances. These Circumstances Include But Are Not Limited To The Following Actions: Falsification Or Unlawful Concealment, Removal, Mutilation, Or Destruction Of Any Official Documents Or Records Or Concealment Of Material Facts By Willful Omission From Official Documents Or Records; Unauthorized Use Of Government Property, Theft, Vandalism, Or Immoral Conduct; Unethical Or Improper Use Of Official Authority Or Credentials; Security Violations; Organizing Or Participating In Gambling In Any Form; And Misuse Of Weapons. 3.3.7 Key Control. The Contractor Will Not Be Issued Any Keys. The Keys Will Be Checked Out From Post 1 By A “cleared American” Escort On The Day Of Service Requirements. 3.3.8 Notice To The Government Of Labor Disputes. The Contractor Shall Inform The Cor Of Any Actual Or Potential Labor Dispute That Is Delaying Or Threatening To Delay The Timely Performance Of This Contract. 4.0 Scheduled Preventive Maintenance 4.1. General 4.1.1. The Contractor Shall Perform Preventive Maintenance As Outlined In Statement Of Work. The Objective Of Scheduled Preventive Maintenance Is To Prevent System Malfunction, Breakdown And Deterioration When Units Are Activated/running. 4.1.2. The Contractor Shall Inventory, Supply And Replace Expendable Parts (filters, Fuses, Indicators, Gaskets) That Have Become Worn Down Due To Wear And Tear. The Contractor Shall Maintain A Supply Of Expendable And Common Parts On Site So That These Are Readily Available For Normal Maintenance To Include: Fuses, Indicators, Oil, Chemicals, Coolant, Filters (air, Oil), Grease, Sealant, Thermostat; In Addition To The Appropriate Tools, Testing Equipment, Safety Shoes And Apparel For Technicians, Personal Protective Equipment (hands, Hearing, Eye Protection), Sds, Cleaning Material And Oil Spill Containment Kits. The Contractor Should Inventory The Supply After Each Visit And Order Replacement Supplies And Have Them Delivered On Site. 4.1.3. Exclusion. This Contract Does Not Include Repair Of Equipment And Replacement Of Hardware. Hardware Replacements Will Be Separately Priced Out By The Contractor For The Government’s Approval And Acceptance. The Government Has The Option To Accept Or Reject The Contractor’s Quote For Parts And Reserves The Right To Obtain Similar Spare Parts From Other Competitive Sources. If Required By The Government, The Contractor Shall Utilize Government-purchased Spare Parts, If Awarded The Work. Such Repairs/replacements Will Be Accomplished By A Separate Purchase Order. However, This Exclusion Does Not Apply If The Repair Is To Correct Damage Caused By Contractor Negligence. 4.1.4. Replacement/repair Of Any Electronic Or Electrical Parts Must Be Approved By The Cor Prior To Installation Of The Part. If The Contractor Proceeds To Replace Any Electronic Or Electrical Parts Without Cor Approval, The Contractor Shall De-install The Parts At No Cost To The Government. 4.2 Checklist Approval the Contractor Shall Submit To The Cor A Schedule And Description Of Preventive Maintenance Tasks Which The Contractor Plans To Provide. The Contractor Shall Prepare This Schedule And Task Description In A Checklist Format For The Cor’s Approval Prior To Contract Work Commencement. 4.2.1. The Contractor Shall Provide Trained Technicians To Perform The Service At Frequencies Stated In Exhibit A And On The Equipment Called Out In This Sow. The Technician Shall Sign Off On Every Item Of The Checklist And Leave A Copy Of This Signed Checklist With The Cor Or The Cor's Designate After The Maintenance Visit. 4.2.2. It Is The Responsibility Of The Contractor To Perform All Manufacturers Recommended Preventive Maintenance As Well As Preventive Maintenance Recommended By The Manufacture Technical Manuals For The Respective Equipment. 5.0 Personnel, Tools, Consumable Materials And Supplies the Contractor Shall Provide Trained Technicians With The Appropriate Tools And Testing Equipment For Scheduled Maintenance, Safety Inspection, And Safety Testing As Required By This Contract. The Contractor Shall Provide All Of The Necessary Materials And Supplies To Maintain, Service, Inspect And Test All The Systems To Be Maintained. 5.1 Contractor Furnished Materials Will Include But Not Limited To Appropriate Tools, Testing Equipment, Safety Shoes And Apparel For Technicians, Hands, Hearing And Eye Protection, Sds, Cleaning Material And Oil Spill Containment Kit. Expendable/consumable Items (e.g. Fuses, Oil, Chemicals, Filters (air, Oil), Generator Starting Batteries, Grease, Sealant, Thermostat), Will Be Maintained In The Onsite Inventory. See 4.1.2. 5.2 Repairs. Repairs Are Not Included In This Contract. See Item 4.1.3. Exclusions. 5.3 Disposal Of Used Oil, And Other Toxic Substances. The Contractor Is Responsible For Proper Disposal Of Toxic/hazardous Substances. All Material Shall Be Disposed Of According To Government And Local Law. After Proper Disposal The Contractor Must Show Proof Of Authorized Disposal Of These Toxic/hazardous Substances. 5.4 Chemical Analysis: The Contractor Is Responsible For Conducting Laboratory Analysis For Coolant And Oil Samples. All Charges For Such Analysis Are Payable By The Contractor And A Report Stating The Test Results Shall Be Submitted To The Cor. 6.0. Load Test: The Contractor Is Responsible For Conducting An Engine Load Test Using An Appropriately Sized Load Prior To Each Annual Transformer Oil Change. 7.0. Deliverables the Following Items Shall Be Delivered Under This Contract: description qty delivery Date deliver To names, Biographic Data, Police Clearance On Contractor Personnel 1 5 Days After Contract Award cor certificate Of Insurance 1 10 Days After Contract Award co certification Of Disposal Of Toxic Chemicals By Local Authorities 1 after Each Change co checklist Signed By Contractor’s Employee 1 after Completion Of Each Maintenance Service cor laboratory Report For Chemical And Oil Analysis 2 7 Days After Completion Of Each 2-year Service cor load Test Report 2 after Completion Of Each 2-year Service cor invoice 2 after Completion Of Each Maintenance Service cor 8.0 Insurance Requirements 8.1 Personal Injury, Property Loss Or Damage (liability). The Contractor Assumes Absolute Responsibility And Liability For All Personal Injuries Or Death And Property Damage Or Losses Suffered Due To Negligence Of The Contractor’s Personnel In The Performance Of This Contract. the Contractor’s Assumption Of Absolute Liability Is Independent Of Any Insurance Policies. 8.2 Insurance. The Contractor, At Its Own Expense, Shall Provide And Maintain During The Entire Period Of Performance Of This Contract, Whatever Insurance Is Legally Necessary. The Contractor Shall Carry The Following Minimum Insurance: workers’ Compensation And Employer’s Liability 8.3 Worker's Compensation Insurance. The Contractor Agrees To Provide All Employees With Worker's Compensation Benefits As Required Under Local Laws (see Far 52.228-4 “worker’s Compensation And War-hazard Insurance Overseas”). 9.0 Local Law Registration if The Local Law Or Decree Requires That One Or Both Parties To The Contract Register The Contract With The Designated Authorities To Ensure Compliance With This Law Or Decree, The Entire Burden Of This Registration Shall Rest Upon The Contractor. Any Local Or Other Taxes Which May Be Assessed Against The Contract Shall Be Payable By The Contractor Without Government Reimbursement. 10.0 Quality Assurance Plan (qap). 10.1 Plan. This Plan Is Designed To Provide An Effective Surveillance Method To Promote Effective Contractor Performance. The Qap Provides A Method For The Contracting Officer's Representative (cor) To Monitor Contractor Performance, Advise The Contractor Of Unsatisfactory Performance, And Notify The Contracting Officer Of Continued Unsatisfactory Performance. The Contractor, Not The Government, Is Responsible For Management And Quality Control To Meet The Terms Of The Contract. The Role Of The Government Is To Conduct Quality Assurance To Ensure That Contract Standards Are Achieved. performance Objective pws Para performance Threshold services. performs All Services Set Forth In The Performance Work Statement (pws) 1 Thru 9 all Required Services Are Performed And No More Than One (1) Customer Complaint Is Received Per Month 10.2 Surveillance. The Cor Will Receive And Document All Complaints From Government Personnel Regarding The Services Provided. If Appropriate, The Cor Will Send The Complaints To The Contractor For Corrective Action. 10.3 Standard. The Performance Standard Is That The Government Receives No More Than One (1) Customer Complaint Per Month. The Cor Shall Notify The Contracting Officer Of The Complaints So That The Contracting Officer May Take Appropriate Action To Enforce The Inspection Clause (far 52.212-4, Contract Terms And Conditions-commercial Items), If Any Of The Services Exceed The Standard. 10.4. Procedures. 10.4.1 If Any Government Personnel Observe Unacceptable Services, Either Incomplete Work Or Required Services Not Being Performed, They Should Immediately Contact The Cor. 10.4.2 The Cor Will Complete Appropriate Documentation To Record The Complaint. 10.4.3 If The Cor Determines The Complaint Is Invalid, The Cor Will Advise The Complainant. The Cor Will Retain The Annotated Copy Of The Written Complaint For His/her Files. 10.4.4 If The Cor Determines The Complaint Is Valid, The Cor Will Inform The Contractor And Give The Contractor Additional Time To Correct The Defect, If Additional Time Is Available. The Cor Shall Determine How Much Time Is Reasonable. 10.4.5 The Cor Shall, As A Minimum, Orally Notify The Contractor Of Any Valid Complaints. 10.4.6 If The Contractor Disagrees With The Complaint After Investigation Of The Site And Challenges The Validity Of The Complaint, The Contractor Will Notify The Cor. The Cor Will Review The Matter To Determine The Validity Of The Complaint. 10.4.7 The Cor Will Consider Complaints As Resolved Unless Notified Otherwise By The Complainant. 10.4.8. Repeat Customer Complaints Are Not Permitted For Any Services. If A Repeat Customer complaint Is Received For The Same Deficiency During The Service Period, The Cor Will contact The Contracting Officer For Appropriate Action Under The Inspection Clause. 11. Transition Plan/contacts within 15 Days After Contract Award, The Contracting Officer May Ask The Contractor To Develop A Plan For Preparing The Contractor To Assume All Responsibilities For Preventive Maintenance Services. The Plan Shall Establish The Projected Period For Completion Of All Clearances Of Contractor Personnel, And The Projected Start Date For Performance Of All Services Required Under This Contract. The Plan Shall Assign Priority To The Selection Of All Supervisors To Be Used Under The Contract. 11.1 On Site Contact. The Following Are The Designated Contact Personnel Between The Us Embassy And The Contractor facility Manager: christopher D Law contracting Officer Representative christopher D Law technical Specialist: mamadou Alimou Barry 12. Submission Of Invoices the Contractor Shall Submit An Invoice After Each Preventive Maintenance Service Has Been Performed. Invoices Must Be Accompanied By A Signed Copy Of The Maintenance Checklist For The Work Performed Including Parts Replacement And Break Down Calls, If Any. No Invoice For Preventive Maintenance Services Will Be Considered For Payment Unless Accompanied By The Relevant Documentation. 13. Personnel Health Requirements all Employees Shall Be In Good General Health Without Physical Disabilities That Would Interfere With Acceptable Performance Of Their Duties. All Employees Shall Be Free From Communicable Diseases. 14. Ordering Official the Designated Ordering Individual Under Far 52.216-18 Is The Contracting Officer. 15. Security Clearances 15.1 Work Within The Caa (and Other Areas As Designated By The Rso) Must Be Performed By Cleared American Workers Having Top Secret Security Clearances. 16. Task Orders the Contracting Officer Will Issue Task Orders To The Contractor To Perform Any Work Under This Contract. If A Task Is Given Orally, It Will Be Followed Up By A Written Task Order Within Two (2) Days Of The Oral Order. All Task Orders Will Be In Written Form, State The Manner Of The Work To Be Performed, And Have An Issue Date And A Date By Which The Work Is To Be Completed. 17. Project Management And Supervision in View Of The Importance Of This Project, The Contractor Shall Assign A Specific Project Manager Who Will Be The Direct Liaison With The Cor Concerning All Work Related To This Contract. It Will Be The Project Manager’s Task To Direct, Schedule, Supervise, Inspect And Test The Work Under This Contract, And To Receive Instructions From The Cor. The Contractor’s Project Manager Shall Be Able To Speak And Understand The English Language At Level 2. Level 2 Is Defined As Being Able To Verbally Satisfy Routine Demands And Limited Work Requirements And Being Able To Comprehend Simple Written Material On Subjects Within A Familiar Context. quality Control Shall Be The Responsibility Of The Contractor. The Contractor Shall Perform Inspection Visits To The Work Site On A Regular Basis. These Visits Shall Be Coordinated With The Cor But Shall Be Surprise Inspections To Those Working On The Contract. 18. Definitions “american Embassy” And “embassy” Mean The Diplomatic Or Consular Mission Of The United States Of America For Which Services Are Provided Under This Contract. “department” Means The Department Of State, Including All Of Its Activities Wherever Located. “government” Means The Government Of The United States Of America Unless Specifically Stated Otherwise. 19. Inspection By Government the Services And The Supplies Furnished Will Be Inspected From Time To Time By The Cor, Or His/her Authorized Representatives, To Determine That All Work Is Being Performed In A Satisfactory Manner, And That All Supplies Are Of Acceptable Quality And Standards. the Contractor Shall Be Responsible For Any Countermeasures Or Corrective Action, Within The Scope Of This Contract, Which May Be Required By The Contracting Officer As A Result Of Such Inspection. 20. Subcontracting the Contractor Shall Not Subcontract Any Work To Be Performed Without The Express Consent Of The Contracting Officer. 21. Security general. The Government Reserves The Right To Deny Access To U.s.-owned And U.s.-operated Facilities To Any Individual. The Government Will Run Background Checks On All Proposed Contractor Employees. The Contractor Shall Provide The Names, Biographic Data And Police Clearance On All Contractor Personnel Who Shall Work On This Contract. identity Cards. The Government Shall Issue Identity Cards To Contractor Personnel, After They Are Approved. Contractor Personnel Shall Display Identify Card(s) On The Uniform At All Times While Providing Services Under This Contract. These Identity Cards Are The Property Of The Government. The Contractor Is Responsible For Their Return At The End Of The Contract, When An Employee Leaves Contractor Service, Or At The Request Of The Government. 22. Ordering Official the Designated Ordering Individual Under Far 52.216-18 Is The Contracting Officer. exhibit A - Statement Of Work switchgear i. General Information: the United States Embassy Conakry, Guinea Requires Professional Services And Contractor Cost Proposals To Perform Preventive Maintenance Services Of The Facility’s Electrical Switchgear(s). ii. Project Requirements: the Contractor Shall Perform Preventive Maintenance As Described In This Statement Of Work. The Objective Of Scheduled Preventive Maintenance Is To Eliminate System Malfunction, Breakdown, And Deterioration When Units Are Activated/running. Description Of Equipment *: *the Attached Equipment List Provides Details Of The Equipment To Be Maintained. nec Switchgears Square D Qed (3) switch Board Qed 4000 A (2) switch Board Qed 200 A (1) switch Board Qed 1200 A (1) transformer 20kv/400v – 2500 Kva (cooper Power System) demarc Mv Switch, 20kv, Sm6-cm 400a, 50hz, Iec 62271-200, Merlin Gerin mv Switch, 20kv Back Of Gen Room, S&c Pme Pad-mounted Gear iii. General Requirements: the Contractor Shall Provide The Labor, Tools, And Materials Required To Perform All Preventive Maintenance As Outlined In This Sow. Embassy Staff Have Service Manuals For Switchgears On-site. The Contractor Shall Confirm Government Provided Manuals Are Complete And Current And Provide The Contracting Officer’s Representative (cor) A Listing Of Any Missing Or Out Of Date Manuals. The Technician Shall Sign Off On Every Task Specified In The Statement Of Work And Will Provide A Typewritten Copy Of Their Report To The Cor Or The Cor's Designate Within Five Business Days Of Each Maintenance Visit. iv. Scope Of Work - - Electrical Switchgear Preventive Maintenance contractor Shall Provide All Materials, Supervision, Labor, Tools And Equipment To Perform Preventive Maintenance. All Personnel Working In The Vicinity Shall Wear And /or Use Appropriate Safety Protection While All Work Is Performed. Any Questions Or Injuries Shall Be Brought To The Attention Of The Post Cor And Occupation Safety And Health Officer (posho) Immediately. Safety Data Sheets (sds) For All Hazmat Shall Be Provided By The Contractor. Copies Shall Be Provided To The Cor For Approval. the Systems And Components To Be Maintained Include Power Conducting Equipment Such As Switches, Circuit Breakers, Fuses And Control Systems Such As Control Panels, Current Transformers And Protective Relays. The Attached Equipment List Provides Details. the Contractor Shall Provide The Cor With A List Of Necessary Parts And Materials. the Contractor Shall Provide Emergency Assistance For Switchgear Support, Priced At An Hourly Rate, Within 24 Hrs Of Being Contacted By The Cor. 3. The Government Will Not Provide Equipment For Switchgear Testing: Circuit Breaker Lifting Truck, Multimeter, Current Leakage Tester, Power Meter, Megger, Vacuum Blower, Wire Stripper, Wrench, Etc. if Any Discrepancies Are Found With The Switchgear(s) That Are Not Covered Under This Scope Of Work, Then The Contractor Shall Provide The Following: detailed Report Noting The Discrepancy Found. bill Of Materials (bom) To Include Component Name, Quantity, Part #, And Price For Any Repair Material Required And Material Lead Time. the Contractor Shall Provide Emergency Assistance For Switchgear Support Within 24 Hours Of Being Contacted By The Cor. price Quote For Repair Labor. at A Minimum, The Following Work Must Be Done: safety & Special Instructions: use Appropriate Personal Protective Equipment (ppe) When Performing Work check All Work Areas, Tools, And Equipment To Ensure Unsafe Conditions Are Eliminated Or Guarded Against. follow Site Safety Procedures. schedule Maintenance With Operating Personnel And Affected Offices (security). follow Approved Lockout/tag Out Procedures. lockout And Disconnect The Main Power Before Tightening The Main Supply Lugs In Order To Avoid The Hazard Of Electrical Shock, Which Could Result In Serious Personal Injury Or Death. review And Follow The Manufacturer’s Instructions. record Results In The Equipment History Log. remove Lockout/tag Out In Accordance With Appropriate Procedures. report All Incidents And Near Miss Incidents To Cor And Assist As Requested In The Investigation And Corrective Action. at A Minimum, The Contractor Shall Comply With The Following: notes: contractor Shall Submit To The Cor For Review, Work Sheet/checklist That Will Be Used For Performing Maintenance Service. a Discrepancy Report Shall Be Submitted To The Cor Immediately Upon Discovery Of Any Condition That Could Result In Equipment Failure. maintenance Procedures: the Purpose Of This Statement Of Work Is To Ensure The Switchgear(s) For This Facility Are Maintained According To Manufacturer’s Recommendations To Ensure The Readiness And Proper Operation Of The System. coordination Of Scheduling Maintenance Shall Begin 90 Days In Advance. annual Schedule: step-one, Visual Inspection: confirm Working Space And Clearance Is Maintained Around All The Electrical Gear Per The National Electrical Code (nec) Requirements. check That The Electrical Room Is Free From Foreign Articles Not Associated With The Room. perform Visual And Mechanical Inspection To Ensure The Proper Operation Of All Factory And Vender Installed Meters, Breakers And Remote Power Monitoring Equipment Associated With The Switch Gear. inspect The Entire Switchgear For Loose Parts Or Connections. Slight Discoloration Or Tarnish Of The Silver Plate Is Normal And Of No Concern. Severe Discoloration Of The Silver Plate Is A Sign Of An Improper Or Loose Contact And Overheating. inspect Physical, Electrical, And Mechanical Condition Including Evidence Of Moisture Or Corona. inspect That All Filters Are In Place, And The Vents Are Clear. clear Loose Dust And Dirt Using An Industrial Vacuum Cleaner Or Lint Free Cloth. Wipe Off The Insulation With A Clean Cloth. check To See That All Anchor Bolts And Other Structural Bolts Are Tight. check For Undue Noise And Vibration. check For Evidence Of Loose Bolted Connections. step-two, Verification: compare The Installed Metering Measurements With Voltage And Power Readings From A True Rms Meter. Make Calibration Corrections As Necessary To Ensure Accurate Voltage And Power Readings. verify The Switchgear Circuit Breakers Sizing Match The Drawings. verify The Proper Labeling Of All The Breakers In The Switchgear. . verify Operation Of Heaters And Thermostats, If Used verify That The Post As-built Drawings (electrical One-line) Match The Switchgear Distribution. Make “red Ink” Corrections On A Paper Copy As Necessary. Inform The Cor And Fm Of Any Discrepancies Or Changes To The Drawings. verify That The Required Nfpa70-e Safety Equipment Is Available And In Good Condition For Local Staff To Use. refer To The Manufacture’s Recommendations For Additional Maintenance Requirements. step-three, Inspect/clean/correct: schedule Power Outage Of Equipment For Cleaning. Coordinate Any Required Outage With The Cor And Fm. perform Proper Lock-out/tag-out And Ensure The System Is De-energized Before Removing Panel Covers And Exposing Any Electrical Bus Or Cabling. Under No Circumstances Should The Equipment Be Energized During The Maintenance Operation. photo Of Equipment Locked And Tagged Out Is Required In Final Report Documentation. inspect Anchorage, Alignment, Grounding For The Equipment. perform Infrared Testing On All Conductor Connections, Buss Terminations. Record Hot Spots On Digital Format For Review. inspect The Bus Bar Connections And Insulating Barrier(s) For Damage. inspect The Cable Load Connectors, Stand­off Insulators, Primary Contact Supports, And All Accessible Cable Terminations For Indications Of Insulation Deterioration. Vacuum Each Compartment And Wipe Off All Insulation. as Applicable Perform Function Tests On Breakers, Test Trip Units And Settings. Replace Any Faulty Batteries, Fuses, Or Switches. clean Each Compartment. Check For Damage, Excessive Wear, Or Corrosion. lubricate The Primary And Ground Contacts And All Moving Joints (shutters, Mechanism-operated Cell (moc), Truck-operated Cell (toc), Etc.) Inspect The Chains/sprocket And The Lifting Rail Of Lift Truck, If Used For Normal Operation. Lubricate Per Manufacturer Recommendations. spot Check And Correct Any Loose Components Or Connections. torque Loose Connections Identified During The Infrared Test Or During Inspection. confirm Correct Operation And Sequencing Of Electrical And Mechanical Interlock Systems. apply Appropriate Dielectric Lubrication On Moving Current-carrying Parts And On Moving And Sliding Surfaces. All Friction Surfaces And Articulation In The Circuit Breaker, Disconnector And Earthing Switch Drives Must Be Lubricated. Refer To Manufacturer’s Recommendations For Approved Lubricants And Points Of Lubrication. correct Any Faulty, Damaged, Discolored, And Worn Components Using Government Provided Spares. exercise All Active Components. inspect Mechanical Indicating Devices For Correct Operation. inspect All Power Control Transformers For Physical Damage, Cracked Insulation, Broken Leads, Tightness Of Connections, Defective Wiring, Proper Overload Protection, And Overall General Wiring. follow The Manufactures Recommendations For Additional Maintenance Requirements. clean Or Replace Any Air Filters Present. make Calibration Corrections As Necessary To Ensure Accurate Voltage And Power Readings On Permanently Installed Switchgear Metering. check All Control Circuits By Tugging On Each Wire To Verify A Snug Fit. insert All The Circuit Breakers To The Test/disconnected Position With Their Secondary Control Power Plugs Engaged And Close The Compartment Doors. Connect The Control Power Source. close The Main Source Of Power And Operate Each Circuit Breaker Electrically In The Test/disconnected Position. operate The Switch Several Times Manually To Verify That It Is Operating Properly. remove Lockout/tag Out In Accordance With Appropriate Procedures. after Re-energizing The Equipment Ensure That All Components Are Up And Functioning Properly. Make The Cor And Fm Aware Of All Components That Are Not Functioning Properly.

Don Emilio Del Valle Memorial Hospital Tender

Electrical Cables And Wires...+1Electrical and Electronics
Philippines
Closing Date5 Nov 2024
Tender AmountPHP 10 Million (USD 171.6 K)
Details: Description Project Title : Repair/renovation Of Doña Felomina Building Location : Devmh Compound, Bood, Ubay, Bohol Estimated Project Cost : Php 10,000,000.00 Terms Of Reference Summary Of Works A. General Requirements I. Mobilization/demobilization • The Work Consists Of The Mobilization And Demobilization Of The Contractor’s Forces And Equipment Necessary For Performing The Work Required Under The Contract. Ii. Permits And Licenses • Process And Submit Electrical Design Review Including Sign And Seal Of Electrical Plans, Electrical Review, Analysis, Computations And Signature Of Pee On Electrical Plans And Including All Forms And Plans For The Application Of Permit To Construct (ptc) For Doh Licensing. Design And Analysis Should Be Submitted Prior To Commencement Of Civil Works. Iii. Temporary Facilities • Temporary Facilities Shall Be Provided During The Construction Period And Will Be Constructed Within The Hospital Compound, Which Shall Serve As The Field Office, Storage Of Materials And Bunkhouse For The Workers. The Contractor Shall Provide And Maintain Temporary Power & Lighting, Temporary Water Service & Security Within The Construction Site. Iv. Health, Safety & Environment Control (complete Ppe, Safety Equipment & Devices & Safety Accessories And Signages) • Safety/warning Signage Must Be Placed By The Contractor On The Construction Area With Clear Demarcation Of Construction Zones To Prevent Unauthorized Access. • Detours And Closures: Provide Directions For Alternate Routes And Notice Of Any Closed Areas. • Hazard Notifications: Provide Signs Indicating Potential Dangers In Construction Areas (e.g., "hard Hat Area," "no Entry"). • Emergency Information: Clear Guidance On Emergency Exits And Procedures During Construction. • Fall Protection: Always Use Safety Harnesses And Guardrails. • Weather Conditions: Avoid Dismantling In High Winds, Rain, Or Extreme Temperatures. • Team Communication: Maintain Clear Communication Among Team Members And Healthcare Facility Engineering Team To Coordinate Movements And Tasks. V. As-built (record) Drawings & Related Documents • Submit One (1) Completed Set Of Signed And Sealed As-built Plans (whiteprint Copy) • Submit One (1) Set Of Electronic Files Of Signed And Sealed As-built Plans (cadd Editable File) • The Drawings Shall Be Supplemented With Descriptive Specification As Appropriate To Clearly Record The Exact Form And Content Of Work Described In This Specification And On The Drawings. • Maintain A Complete And Accurate Record Of All Changes Or Deviations To The Contract Documents And Shop Drawings In The Trade Contractor’s Field Office. Such Record Copy Shall Indicate The Work As Actually Constructed And Be Available For Hospital Appointed Engineer To Review. • Incorporate All Minor Revisions And Clarifications Noted Thru The Field Modification Process Which May Not Necessarily Be Shown On The Architectural Drawings Or Issued As Addenda, Bulletins, Or Change Orders. • Field Changes Shall Be Neatly And Correctly Shown On One Set Of Record Prints On A Daily Basis By The Foreman, Or Superintendent Of Are Each Trade; And This Set Will Act As A Record Set At Completion Of The Work And Is Intended To Be Of Assistance To The Trade Contractor In Preparing Record Documents. Vi. Material Sustainability • The Contractor Shall Use At Least Ten Percent (10%) Locally Manufactured Materials For The Project. Submit Purchase Order And Other Supporting Documents As Evidence. • The Contractor Shall Avoid Using Building Materials/products That Contain Toxic Chemicals Or Use Materials That Are Low In Volatile Organic Compound. Please Refer To The Following • Materials Specification As Stated On This Terms Of Reference. • The Contractor Shall Only Used Light Bulbs And Electrical Devices With More Efficient Models And Type As Specified On Approved And Signed Bill Of Quantities (e.g. Led Bulbs). Submit Purchase Order And Other Supporting Documents As Evidence. • The Contractor Shall Conform To The Following Painting And Other Wet Applied Materials (such As Coatings, Sealants) Requirements: 1. Only Qualified Products With Mpi "environmentally Friendly" E1 E2 E3 Rating Will Be Used. Paints, Coatings, Thinners, Solvents, Cleaners And Other Fluids Used In Repainting, Shall:  Not Contain Methylene Chloride, Chlorinated Hydrocarbons, Toxic Metal Pigments.  Be Manufactured Without Compounds Which Contribute To Ozone Depletion In The Upper Atmosphere.  Be Manufactured Without Compounds Which Contribute To Smog In The Lower Atmosphere. Be Manufactured In A Manner Where Matter Generating A 'biochemical Oxygen Demand' (bod) In Undiluted Production Plant Effluent Discharged To A Natural Watercourse Or A Sewage Treatment Facility Lacking Secondary Treatment Does Not Exceed 15 Mg/l.  Be Manufactured In A Manner Where The Total Suspended Solids (tss) Content In Undiluted Production Plant Effluent Discharged To A Natural Watercourse Or A Sewage Treatment Facility Lacking Secondary Treatment Does Not Exceed 15 Mg/l. 2. Paints And Coatings Must Be Manufactured And Transported In A Manner That Steps Of Processes, Including Disposal Of Waste Products Arising There From, Will Meet Requirements Of Applicable Governmental Acts, By-laws And Regulations In The Philippines. 3. Paints And Coatings Must Not Be Formulated Or Manufactured With Formaldehyde, Halogenated Solvents, Mercury, Lead, Cadmium, Hexavalent Chromium Or Their Compounds. Eco Labeled. 4. Anti-corrosive Coatings: Provide A Certification By The Manufacturer That Products Supplied Comply With The Volatile Organic Compound (voc) And Chemical Component Restrictions Of Green Seal Environmental Standard Gc-03, If The Product Is An Anti-corrosive Coating Applied Indoors And On-site. 5. Other Interior Coatings: If The Product Is Applied Indoors And On-site, And Not Covered By Both The Green Seal Environmental Standard Gs-11 And Standard Gc-03, Provide A Certification By The Manufacturer That Products Supplied Comply With The Chemical Component Restrictions Of The Green Seal Environmental Standard Gs-11, Paints, And Comply With The Volatile Organic Compound (voc) Restrictions Of The State Of California Air Resources Board (carb) Suggested Control Measure For Architectural Coatings, And The South Coast Air Quality Management District Rule 1113: Architectural Coatings B. Civil Works I. Site Works • The Contractor Shall Be Responsible In Setting Out Reference Lines, Elevations (lines And Grades) Prior And During The Execution Of The Works. All References Shall Be Maintained And Protected By The Contractor At His Own Expense. Disturbed References Shall Be Restored To Its Original Position Without Extra Cost To The Healthcare Facility. • Work Includes But Is Not Limited To:  Demolition/clearing Works For Ceiling  Demolition/clearing Works For Concrete Walls  Chipping Of Existing Tile Setting Ii. Structural & Concrete Works (refer Applicable Sections On Chapter 4 Of The Nscp, For Quality Of Materials, Workmanship, Execution, Acceptance, Etc.) Iii.1. General • Provide All Labor, Materials, Equipment, Transportation, And Services Required To Complete All Work Specified Herein Indicated Or As Shown On The Drawings. • Work Includes But Is Not Limited To:  Wall Footing, 3500 Psi  Concrete Countertop Sink, 3500 Psi  Stiffener Columns And Lintel Beams At Door And Window Openings, Every 3m Width And 2.1m Height Of Chb 2500 Psi Iii.2. Standards • Except As Modified By Governing Codes And By Contract Documents, Comply With The Provisions And Recommendations Of The Following, Latest Edition:  Ansi American National Standards Institute  Astm American Society For Testing Of Materials  Aci American Concrete Institute  Nbcp National Building Code Of The Philippines And Its Revised Irr  Nscp National Structural Code Of The Philippines Iii.3. Concrete • Structural Concrete – Concrete Pouring Using Concrete Strength 3,500 Psi, Class Aa Ready Mix Or Job Mixed Concrete Together With The Concrete Cylinder Sample For Testing Materials. • Concrete Mix Shall Be Subject To Adjustment To Attain The Required Strength Or Desired Mix Consistency, Subject To Approval Of The Hospital Engineer. • Portland Cement, Type 1 • Manufactured Or River-run Run Gravel For Structural Concrete, ¾ “max Properly Graded” • Washed Sand For Structural Concrete • Water: Use Potable Water Free From Alkaline Or Deleterious Substance That May Affect The Strength Of Concrete. Use Of Rain Water Will Not Be Permitted. • All Materials Shall Be Free From Clay, Lumps Or Any Deleterious Object Or Matter That Will Impair The Strength Of Concrete. • Mixing Shall Be Thoroughly Done In A Mixer Of An Approved Size And Type To Insure A Uniform Distribution Of The Materials Throughout The Mass. • Site-mixed Concrete (job Mixed Concrete) - All Structural Concrete Shall Be Machine-mixed For At Least 1 ½ Minutes After All Materials Including Water Are In The Mixing Drum. No Hand Mixing Shall Be Allowed, Except In Case Of Emergency Of Breakdown During Pouring Operations. • Ready-mixed Concrete - Mixed And Delivered From A Plant Approved By The Project Manager, And Shall Be In Strict Compliance With The Requirements Set Forth In Astm C94. • Concrete Shall Be Placed Only After All Formworks, Materials To Be Embedded, And Preparation Of Surface Involved In The Placing Have Been Inspected And Approved By The Hospital Engineer. The Contractor Shall Provide Equipment And Shall Employ Methods That Will Minimize Separation Of Aggregates From The Concrete Mix. Concrete In Columns Shall Be Placed In One Continuous Operation. Concrete In Girders, Beams And Slabs In Superstructures Shall Be Poured In A Monolithic And Continuous Manner. No Construction Joint Shall Be Allowed On Any Part Of The Structure Without The Approval Of The Hospital Engineer. • Slump Of Concrete Shall Not Exceed 3 Inches • Placement Of Concrete Shall Be In Accordance To Standard Norms, When Using Portable Concrete Mixers. • Cure Concrete Sprinkling Water And Wetted Continuously For 7-day Period. Iii.4. Thermal Moisture Protection • Except As Modified By Governing Codes And By Contract Documents, Comply With The Provisions And Recommendations Of The Following, Latest Edition:  Ansi American National Standards Institute  Astm American Society For Testing Of Materials  Aci American Concrete Institute  Nbcp National Building Code Of The Philippines And Its Revised Irr  Nscp National Structural Code Of The Philippines Iii.5. Steel Reinforcements • Steel Reinforcements Shall Be Astm A615, Deformed Steel Bars, Grade 40. • Supply, Fabricate And Install Reinforcing Steel As Shown On Drawings. Placing Of Steel Reinforcements Shall Be In Accordance With Current Industry (local) Code (or Aci-347). • Secure The Reinforcements Using #16 G.i. Tie Wires. • Steel Reinforcement Shall Be Provided Together With All The Necessary Tie Wires, Spacers, Support And Other Necessary Devices. Reinforcing Steel Shall Be Accurately Cut And Bent In Accordance With The Approved Detailed Reinforcement Drawings. The Hospital Engineer May Require The Contractor To Prepare And Submit Bar Cutting Schedule Prior To Fabrication Of Reinforcing Steel Bars. • Steel Reinforcements Shall Be Free From Mill Scales, Rusts, Oils, Contamination That Will Impair The Bonding Property To Concrete. Iii.6. Structural Steel, Metal Works And Stainless Ladder (refer Chapter 5 Of The Nscp) • Provide All Labor, Materials, Equipment, Transportation, And Services Required To Complete All Work Specified Herein Indicated Or As Shown On The Drawings. • Work Includes But Is Not Limited To:  Prefabrication Of Stainless Steel 304 Ladder Handle, And Manhole Cover. • Materials Steel And Metals For The Works Shall Meet The Requirements Of Astm A36, Hot-rolled Shapes And Plates. • All Steels Shall Be Primed With Epoxy-based Paint With -2- Finish Coats, Color Sample Must Be Submitted To Architect’s/engineer’s For Approval. Substrate Preparation Shall Meet The Requirements Of The Applicable Clauses Of The Steel Structures Painting Council, For Industrial Type Of Construction. All Surfaces Shall Be Free From Mill Scale, Rusts, Oils Or Any Contaminants Detrimental To Adhesion Of Paint. • Welding Works Shall Be In Accordance With Structural Welding Code (american Welding Society-d1.1, Latest Edition). Welding Electrodes Shall Be E6013 And E6012, Minimum, Meeting The Requirements Of Aws A.5. All Welders Shall Meet The Qualifications Under The Aws Codes And Standards. • All Works Under This Item Shall Be Subject To Verification By The Engineer Prior To Commencement Of Fabrication. Contractor Is To Submit Shop Drawings For Architect’s/engineer’s Review Prior To Execution. Iii.7. Formworks • All Forms Shall Be Designed By The Contractor For A Safe Construction Activity And Installed To Dimensions Shown On The Drawings. • Use Phenolic Boards On Formworks With Shoring Supports. • Forms Shall Be Used Whenever Necessary To Confine The Concrete And Shape It To The Required Lines And Dimensions, Or To Protect The Concrete From Contamination. Forms Shall Have Sufficient Strength To Withstand The Pressure Resulting From Placement And Vibration Of The Concrete, And Shall Be Maintained Rigidly In Correct Position. Forms Shall Be Sufficiently Tight To Prevent Loss Of Mortar From The Concrete. • Stripping Of Forms Shall Only Commence After The Concrete Has Gained Sufficient Strength (min Of 7 Days) For Major Structural Elements. C. Architectural Works Furnish Materials And Labor And All Incidentals Necessary For The Completion Of All Architectural Works Shown On Drawings And As Herein Specified. I. Paint Finishes • Paint Materials And Samples Swatches Shall Be Approved By The Architect. • Examine Substrate And Conditions Under Which Painting Will Be Performed. Proceed With The Work Only When Conditions Are Satisfactory. • Do Not Paint Over Dirt, Rust, Scale, Grease, Moisture, Scuffed Surfaces, Or Conditions Otherwise Detrimental To Formation Of A Durable Paint Film. • Clean Surfaces To Be Painted Before Applying Paint Or Surface Treatments. Remove Oil And Grease Prior To Mechanical Cleaning. Program Cleaning And Painting So That Contaminants From Cleaning Process Will Not Fall Into Wet, Newly-painted Surfaces. • Perform Preparation And Cleaning Procedures In Accordance With Paint Manufacturer’s Instructions And As Herein Specified, For Each Particular Substrate Condition. • Ferrous Metals: Clean Non-galvanized Ferrous-metal Surfaces That Have Not Been Shop Coated; Remove Mortar, Plaster, Grease, Dirt, Rust, Loose Mill Scale And Other Foreign Substances By Solvent Or Mechanical Cleaning Methods That Comply With The Recommendations Of The Steel Structures Painting Council, Before Priming Coat Is Applied. I. Floor Finishes • Tile Works  General: All Surfaces To Receive Tiles, Shall Be Free From Loose Plaster, Where Required, Existing Setting Mortar Bed Shall Be Stripped, Removed To Allow Proper Setting Of Tiles To Desired Finished Elevation. No Separate Payment For Trimming Existing Mortar Bed And Shall Be Deemed Included Elsewhere.  Material Shall Be Subject To Review And Approval Of The Architect. Contractor To Submit Samples For Color And Texture Selection Prior To Delivery And Installation.  All Floor Cuttings On Both Ends Of The Walls Shall Be Of Equal Width.  Tile Grout Color To Match Color Of Tiles Or As Directed By The Architect.  Setting Bed Or Mortar Shall Be Dry Mixed, Sand-cement Mix With Water Added To Produce The Desired Consistency And Slurry Mix For Adhesion. Use Tile Adhesive For Areas That Are Less Than 1.5 Inches From Finish Floor Line.  All Exposed Corner Edges Shall Be Provided With Aluminum Stair Nosing.  No Human Traffic Or Construction Loads Shall Be Applied To All Newly Installed Tiles, And Allow Setting Mortar And Adhesive To Cure Prior. • Floor Tile Works  Common Areas – 60cmx60cm Glazed Ceramic Floor Tiles.  Service Areas – 60cmx60cm Unglazed, Non-skid Ceramic Floor Tiles.  Toilets And Janitor’s Closet – 30cmx30cm Non-skid Ceramic Floor Tiles.  Cuttings On Both Ends Of The Walls Shall Be Of Equal Width With The Floor Finish.  All Exposed Corner Edges Shall Be Provided With Pvc Tile Trims.  No Human Traffic Or Construction Loads Shall Be Applied To All Newly Installed Tiles, And Allow Setting Mortar And Adhesive To Cure Prior. Ii. Wall & Ceiling Finishes • Wall Tile Works  All Toilets – 30cmx60cm Glossy/polished Ceramic Tiles.  Cuttings On Both Ends Of The Walls Shall Be Of Equal Width With The Floor Finish.  All Exposed Corner Edges Shall Be Provided With Pvc Tile Trims. - No Human Traffic Or Construction Loads Shall Be Applied To All Newly Installed Tiles, And Allow Setting Mortar And Adhesive To Cure Prior. • Painting Works  Paint Materials And Samples Swatches Shall Be Approved By The Architect.  Examine Substrate And Conditions Under Which Painting Will Be Performed. Proceed With The Work Only When Conditions Are Satisfactory.  Do Not Paint Over Dirt, Rust, Scale, Grease, Moisture, Scuffed Surfaces, Or Conditions Otherwise Detrimental To Formation Of A Durable Paint Film.  Clean Surfaces To Be Painted Before Applying Paint Or Surface Treatments. Remove Oil And Grease Prior To Mechanical Cleaning. Program Cleaning And Painting So That Contaminants From Cleaning Process Will Not Fall Into Wet, Newly-painted Surfaces.  Perform Preparation And Cleaning Procedures In Accordance With Paint Manufacturer’s Instructions And As Herein Specified, For Each Particular Substrate Condition.  Ferrous Metals: Clean Non-galvanized Ferrous-metal Surfaces That Have Not Been Shop Coated; Remove Mortar, Plaster, Grease, Dirt, Rust, Loose Mill Scale And Other Foreign Substances By Solvent Or Mechanical Cleaning Methods That Comply With The Recommendations Of The Steel Structures Painting Council, Before Priming Coat Is Applied. • Painting Systems  Exterior Surfaces: - Concrete, Concrete Masonry, Rendered Smooth - Concrete Neutralizer – One (1) Coat, Dry For 6 Hours. - Putty Surface Imperfections, Hairline Cracks With Patching Compound Using Putty Knife - Prime – Two (2) Coats Flat Latex, Dry For Two (2) Hours. - Topcoat – Two (2) Coats Of Semi-gloss Latex, Two (2) Hours Interval Between Coats. - Thinning / Clean-up Solvent – Water - Application – By Brush, Roller, Or Airless Spray  Interior Surfaces: - Concrete, Concrete Masonry, Rendered Smooth - Concrete Neutralizer – One (1) Coat, Dry For 6 Hours. - Putty Surface Imperfections, Hairline Cracks With Patching Compound Using Putty Knife. - Prime – Two (2) Coats Flat Latex, Dry For Two (2) Hours. - Topcoat – Two (2) Coats Of Semi-gloss Latex, Two (2) Hours Interval Between Coats. - Thinning / Clean-up Solvent – Water - Application – By Brush, Roller, Or Airless Spray  Ceiling & Drywall Surfaces: - Repair Surface Imperfections With Putty Using Putty Knife, Dry For 2 Hours And Sand. - Apply Mesh Tape On Board Joints And Seal Gaps With Patching Compound. Dry For Two (2) Hours And Sand. - Primer – Flat Latex, Dry For Two (2) Hours. - Topcoat – Two (2) Coats Of White Flat Latex Paint, Two (2) Hours Interval Between Coats. - Thinning / Clean-up Solvent - Water - Application – By Brush, Roller, Or Airless Spray • Dry Ceiling, Cove Light & Drop Ceiling  Ceiling - Fiber Cement Board In 4.50mm X 1.2m X 2.4m  Fiber Cement Board Shall Be Stored In Elevated And Well Protected Area. Boards With Broken Edges, Lacerations Etc. Will Not Be Permitted To Be Installed.  Framing - On 0.40mm Thick, 19mm X 50mm Double Furring, And 0.80mm Thick, 12mmx38mm Carrying Channel With Vertical Hanger, Spaced At 0.40m X 0.40m On Centers. • Rendering To Chb Or Concrete Surfaces  All Surfaces To Be Rendered Or Cement Plastered Shall Be Clean From Any Loose Material Or Contamination To Provide Strong Bond Between Plaster And The Surface.  Mix Proportion Shall Not Be Less Than 1 Part Of Cement To 4 Parts Of Screened Sand. Necessary Adjustments Shall Be Made To Provide A Strong And Consistent Mix, Free From Cracking Due To Rapid Hydration Of Plaster Mix.  Tampering Of Previously Mix Concrete Will Not Be Permitted.  All Surfaces To Receive Paint Finish Shall Be Smooth Whilst Surfaces To Receive Tiles Shall Be Rough To Provide Better Adhesion Or Bond. • Doors And Windows  All Wooden Doors Shall Be Kiln Dried And Treated Flush Doors/panel Doors Ready For Installation With The Provisions For Accessories As Indicated On Drawings, Locksets, Door Keys, And Hinge Completely Operational.  All Door Jambs For Wooden Doors Shall Be Pre-fabricated 2”x6” And 2”x4” Wooden Jamb Finished With Automotive Lacquer Paint.  Glass Door (glass/glazing) – 12mm Thk. Tempered Clear Glass On 50mm X 100mm Powder-coated Frameless Sliding Door With 2" X 6" Powder Coated Aluminum Jamb With Complete Hardware Accessories.  Glass Door (glass/glazing) – 1/4” Thk. Clear Glass On 50mm X 100mm Powder-coated Aluminum Framed Sliding Door With 2" X 6" Powder Coated Aluminum Jamb With Complete Hardware Accessories.  Windows (glass/glazing) – 1/4” Mm Thk. Clear Glass Awning Type Analok Aluminum Frame W/ Complete Hardware Accessories And Window Frame Weatherstripping.  All Metal Doors And Jambs – Hollow Core Metal Flush Type Swinging Door With 2" X 6" Steel Jamb – All In Paint Finish By Spray, W/ Complete Hardware And Door Accessories Including Door & Jamb Seals As Indicated On Drawings, Completely Operational.  All Doors And Jambs – Provide All Door Keys With Key Chains And Key Tags With Color And Specifications Subject For Approval Of The Healthcare Facility. • Specialties  Concrete Countertop Sink - Finish – Glossy/polished, Ceramic Tiles, 60cm X 60cm, On All Areas As Indicated On Drawings - Inclusions – Countertop Backsplash And Aprons - Finish And Color – As Selected By Healthcare Facility - Cut Unit To Provide Pattern Indicated And In A Manner That Will Provide Clean, Sharp, Unchipped Edges.  Building/room Signages/wayfinding Systems  Ground Floor - Signages - Room Identification Sign - Chief Nurse Office, 6mm Thick Frosted Acrylic - Room Identification Sign - Pulmonary Unit, 6mm Thick Frosted Acrylic - Room Identification Sign - Physical Therapist Room, 6mm Thick Frosted Acrylic - Room Identification Sign - Janitors Closet, 6mm Thick Frosted Acrylic - Room Identification Sign - Electrical Room, 6mm Thick Frosted Acrylic - Room Identification Sign - Business Office, 6mm Thick Frosted Acrylic - Room Identification Sign - Stakeholders Office, 6mm Thick Frosted Acrylic - Room Identification Sign - Treatment Area, 6mm Thick Frosted Acrylic - Room Identification Sign - Doctors Office, 6mm Thick Frosted Acrylic - Room Identification Sign - Pantry, 6mm Thick Frosted Acrylic - Room Identification Sign - Water Treatment Room, 6mm Thick Frosted Acrylic - Room Identification Sign - Reprocessing Room, 6mm Thick Frosted Acrylic - Room Identification Sign - Waste Holding Area, 6mm Thick Frosted Acrylic - Room Identification Sign - Nurse Station, 6mm Thick Frosted Acrylic - Restroom Identification - Pwd Toilet, 6mm Thick Frosted Acrylic - Restroom Identification – All Gender Toilet, 6mm Thick Frosted Acrylic - Restroom Identification – Staff Toilet, 6mm Thick Frosted Acrylic - Emergency Exit Plan, 6mm Thick Frosted Acrylic G. Plumbing Works Provide All Labor, Materials And Equipment And Perform All The Work Necessary For The Complete Execution Of All The Work As Shown On Drawings And Specified In This Specification. Scope Of Works Shall Include But Does Not Be Limited To The Following Major Items Of Work: • Sanitary And Waterline Piping Works  Furnish And Install Complete Water Distribution System Including Incoming Supply Pipes And Connections, Pipes, Valves, Faucets, Accessories, Etc.  Storage, Delivery, Protection Before Installation And Connection Of Sanitary Line Accessories.  All Sanitary Pipes And Fittings To Be Used Shall Be Made Of Polyvinyl Chloride (pvc Pipes) Series 1000  All Waterline Pipes And Fittings To Be Used Shall Be Made Polypropylene Random Co-polymer (ppr Pipes)  Connections From Existing Water Supply And Existing Catch Basins.  Pressure Testing Of The Installed Water Distribution System.  Leakage Testing Of Soil, Waste, Vent, And Catch Basins And Septic Tank  Disinfections Of Water Distribution System.  Furnish And Install All Required Consumable Materials And Materials Tube Installed.  Investigation Of All Conflicts Of This Work And Coordination With Other Trades. • Plumbing Fixtures, Toilet & Sink Accessories * Submit Samples For Approval Prior To Installation" ** Faucets, Valves & Other Accessories Shall Be Japan, U.s., & E.u. Made  Two-piece Water Closet/s (push Button,4/6 Liters Water Saver) With Wall-mounted Semi- Recessed Ceramic Tissue Holder, Wall-mounted Semi-recessed Ceramic Soap Holder, With Complete Accessories  Lavatory With Pedestal W/ Faucet And W/ Complete Fittings & Accessories  600x400x200x0.8 Mm Stainless Steel Single Bowl Kitchen Sink W/ Complete Fittings & Accessories  Urinal W/ Complete Fittings & Accessories  Ss 304 Towel Bar  Stainless Faucet  Pwd Ss304 Grab Bar (l-type)  Pwd Ss304 Flip-up Bar  Pwd Ss304 Urinal Grab Bar, 2 Pcs Per Set  Stainless Steel 304/brass, Faucet, 1/2" X 6", For Sink  Floor Drain Stainless 6"x6"  Floor Drain Stainless 4"x4" H. Electrical Works Provide All Labor, Materials And Equipment And Perform All The Work Necessary For The Complete Execution Of All The Work As Shown On Drawings And Specified In This Specification. Scope Of Works Shall Include But Does Not Be Limited To The Following Major Items Of Work: • Panel Boards And Circuit Breakers At 3rd Floor  Mdp Assembled In Nema 1 Enclosure, Wall Mounted, Swing Dead Front, Powder Coated With Terminal Lugs In Crimping Type Ready, With Grounding Busbar Main: 300at/300af, 3p, 10kaic, 230 V, Bolt-on Type Mccb Branches: 1 - 60at/60af, 2p, 10kaic, 230 V, Mccb 2 - 125at/125af, 2p, 10kaic, 230 V, Mccb  Glp Assembled In Nema 1 Enclosure, Wall Mounted, Swing Dead Front, Powder Coated With Terminal Lugs In Crimping Type Ready, With Grounding Busbar Main: 60at/60af, 3p, 10kaic, 230 V, Bolt-on Type Mccb Branches: 12 - 20at/60af, 2p, 10kaic, 230 V, Mcb 2- Space  Gpp Assembled In Nema 1 Enclosure, Wall Mounted, Swing Dead Front, Powder Coated With Terminal Lugs In Crimping Type Ready, With Grounding Busbar Main: 125at/125af, 3p, 10kaic, 230 V, Bolt-on Type Mccb Branches: 18 - 30at/60af, 2p, 10kaic, 230 V, Mcb 2- Space  Gpacu Assembled In Nema 1 Enclosure, Wall Mounted, Swing Dead Front, Powder Coated With Terminal Lugs In Crimping Type Ready, With Grounding Busbar Main: 125at/125af, 3p, 10kaic, 230 V, Bolt-on Type Mccb Branches: 14 - 30at/60af, 2p, 10kaic, 230 V, Mcb 2- Space • Roughing-ins  20mm Dia. Upvc Pipe, Male Adapter With Locknut  25mm Dia. Upvc Pipe, Male Adapter With Locknut  20mm Corrugated Electrical Flexible Hose  20mm Electrical Flexible Hose Connector  32mm Dia. Upvc Pipe, Male Adapter With Locknut  50mm Dia. Upvc Pipe, Male Adapter With Locknut  65mm Dia. Upvc Pipe, Male Adapter With Locknut  Junction Box With Cover  Utility Box  Square Box  Consumables • Wires And Cables  Thhn/thwn Wire - 2.0mm², 3.5mm², 5.5mm², 8.0mm², 14.0mm², 22.0mm², 50.0mm², 60.0mm², 80.0mm² • Wiring Devices  Single Pole Switch With Led Indicator, Flush Type Modern Series  Duplex Switch With Led Indicator Flush Type Modern Series  Triplex Switch With Led Indicator Flush Type Modern Series  Single Universal Convenience Outlet, 3 Prong Modern Series, 16a, 230v  Duplex Universal Convenience Outlet, 3 Prong Modern Series, 16a, 230v  Duplex Universal Outlet, Floor Mounted Type, 16a, 230v  Gfci Outlet  Acu Outlet, Universal, 30a, 230v W/ Grounding-type • Lighting Fixtures  4"ø Downlight, With 11w Led Recessed Mounted  2x18w Troffer Led Panel Type Lighting Fixture  Emergency Light  Exit Light  30 Watts Led Flood Light I. Auxiliary Works To Include Fixing And Installation; Complete Accessories And Necessary Consumables; All In Accordance With Auxiliary Plan And Specification And As Indicated On Detailed Cost Estimates: • Fire Alarm And Detection System  Roughing-ins / Wires: - 15mmø Emt Pipe, Coupling, Connector - Pull Box - Metal Flexible Conduit 1/2" - Straight Connector 1/2" - Junction Box W/ Cover - Utility Box - Conduit Supports / Hangers - 1.25mm2 Twisted Pair - Consumables - Equipment: - Smoke Detector - 24v Sounder & Strobe Light (combined) - Manual Push Station 24v - Fire Alarm Control Panel 3 Zones, W/ Back-up Battery, 24v • Paging System  Roughing-ins / Wires: - 15mmø Upvc Pipe, Male Adapter With Locknut - Metal Flexible Conduit 1/2" - Straight Connector 1/2" - Junction Box With Cover - 1.25mm2 Twisted Pair - Consumables - Equipment: - Ceiling Speaker • Tel/lan System  Roughing-ins / Wires: - 15mmø Upvc Pipe - 15mm Dia. Upvc Male Adapter With Locknut - Junction Box With Cover - Utility Box With Cover - Utp Cat 6 4pairs - 1 Gang Outlet - Consumables  Equipment: Telephone And Data Outlet • Cctv System  Roughing-ins / Wires: - 15mmø Upvc Pipe - 15mm Dia. Upvc Male Adapter With Locknut - Junction Box With Cover - Utility Box With Cover - Utp Cat 6 4pairs - 1 Gang Outlet - Consumables  Equipment: - Ip Camera Dome Type J. Fire Protection Works To Include Fixing And Installation; Complete Accessories And Necessary Consumables; All In Accordance With Fire Protection Plan And Specification. • Black Iron Pipes, Fittings, Valves And Accessories: - Bi Pipes Schedule 40 @ 6m, Seamless (also Including Drain Pipe Riser And Auto Sprinkler Riser) And All Fittings, Valves And Accessories As Indicated On Detailed Cost Estimates • Sprinkler Heads And Accessories - Pendent Type: 135 Degrees To 165 Degrees • Others – Hangers And Supports, Miscellaneous And Consumables (including Painting And Tagging) • Testing And Commissioning – Configuration, Testing And Commissioning, Documentation, Training And Orientation K. Mechanical Works To Include Fixing And Installation; Complete Accessories And Necessary Consumables; All In Accordance With Mechanical Plan And Specification And As Indicated On Detailed Cost Estimates: • Air-conditioning Works - 4.0 Hp Split Type Aircon, Inverter Type, - 2.5 Hp Split Type Aircon, Inverter Type - 1.0 Hp Split Type Aircon, Inverter Type - Consumables - L. Request For Final Inspection • Contractor Shall Submit Its Written Request For A Final Inspection Of The Project To The Medical Center Chief Office At Least Seven (7) Days Prior To Project Inspection & Turn-over. M. Tools And Equipment • Various Basic And Advanced Masonry/electrical/carpentry Tools • Measuring And Layout Tools • Safety Equipment • Utility Vehicle N. Technical Personnel Required • Project Engineer • Foreman • Leadman • Skilled Personnel (mason, Carpenter, Steelman, Electrician, Plumber) • Laborer/helper General Guidelines • All Construction Works Shall Be Undertaken By Contractor In Accordance With Existing Laws And All Other Applicable Rules And Regulations. • The Contractor Shall Be Responsible In Setting Out Reference Lines, Elevations (lines And Grades) Prior And During The Execution Of The Works. All References Shall Be Maintained And Protected By The Contractor At His Own Expense. Disturbed References Shall Be Restored To Its Original Position Without Extra Cost To Devmh. • The Contractor Shall Carry Out The Works Properly And In Accordance With This Contract. The Contractor Shall Provide All Supervision, Labor, Materials, Plant And Equipment, Which May Be Required. • The Contractor Shall Commence Execution Of The Works On The Start Date And Shall Carry Out The Works In Accordance With The Approved Pert/cpm Network Diagram Submitted By The Contractor, As Updated With The Approval Of The Procuring Entity’s Representative, And Shall Complete The Works By The Intended Completion Date. • The Contractor Shall Be Responsible For The Safety Of All Activities On The Site. • During On-going Construction And Before The Turn-over Of The Project, Engineering & Facilities Management Staff, End-users, Twg And Bac Shall Inspect The Works Undertaken By Contractor. Hospital Engineers And End-users Discover Any Deviations By Contractor From The Approved Construction Plans, Contractor Shall Be Required To Rectify All Such Deviations, Within Such Period Required By Client. • Contractor Shall Have Full Responsibility For Any And All Damages To Existing Hospital Facilities, Utilities, And/or Any Portion Of The Hospital’s Common Area, Due To The Works Undertaken By Contractor, Whether Accidental Or Intentional. • No Variation Order Shall Be Undertaken Unless Verified By Hospital Engineer And Approved By Executive Committee. • Contractor Shall Not Cover Or Block Stub-outs (cleanouts, Water Source, Exhaust, Sewer, Drainage, Etc.) When Not Utilized. Said Stub-outs Shall At All Times Be Free Of Obstructions And Easily Accessible. • Contractor Shall Secure A Utility Tapping Permit Prior To Tapping From Utility Provision. • Electricity And Water Consumed During Construction Shall Be Charged To Contractor. • End-users Reserves The Right To Inspect The Works At Any Time. • Contractor Shall Insure And Hold Client, Its Affiliates, Officers, Directors, Stockholders, Employees, Agents, And/or Representatives, Free And Harmless From And Against Any Injury, Losses, Claims, Damages, Liabilities, Expenses, And/or Costs Of Litigation, Resulting From Or Arising Out Of The Works Undertaken By Contractor. • In Event Of Force Majeure, The Contractor Shall Rectify, Replace Or Build The Unfinished Projects When It Is Not Yet Completed And Accepted W/o Additional Cost For The Procuring Entity. • Contractor Shall Comply With The Construction House Rules Of This Hospital. Time Of Completion • The Completion Of The Project Shall Be One-hundred Twenty (120) Calendar Days From The Date Of Effectivity.
4841-4850 of 4906 archived Tenders