Ppe Tenders

Ppe Tenders

National Library Of The Philippines Tender

Security and Emergency Services
Philippines
Closing Date11 Dec 2024
Tender AmountPHP 58.6 Million (USD 995.2 K)
Details: Description Invitation To Bid For The Supply, Installation, Testing And Commissioning Of Gas-based Fire Detection, Suppression And Control System For The 3rd Level Stack Room (cylinder & Gas-based Agent Only), 2nd Level Stack Room, And 4th Floor Children’s Library Of The National Library Of The Philippines Phase 5 1.the National Library Of The Philippines (nlp), Through The National Expenditure Program (nep) For Fy 2025 Intends To Apply The Sum Of Fifty-eight Million Six Hundred Seventy-two Thousand Pesos (58,672,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Supply, Installation, Testing And Commissioning Of Gas-based Fire Detection, Suppression And Control System For The 3rd Level Stack Room (cylinder & Gas-based Agent Only), 2nd Level Stack Room, And 4th Floor Children’s Library Of The National Library Of The Philippines Phase 5 (pb24-24). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2.the National Library Of The Philippines (nlp) Now Invites Bids For The Above Procurement Project. Completion Of The Works Is Required In One Hundred Twenty (120) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3.bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4.interested Bidders May Obtain Further Information From National Library Of The Philippines (nlp) And Inspect The Bidding Documents At The Address Given Below From Monday To Friday (except Holidays), From 08:00am To 04:00pm. 5.a Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 19, 2024 From The Given Address And Website Below And Upon Payment Of A Non-refundable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees Through Email. 6.the National Library Of The Philippines (nlp) Will Hold An Online Pre-bid Conference On November 27, 2024 At 10:00 Am Through Videoconferencing Which Shall Be Open To All Prospective Bidders. Send Interest To Bac@nlp.gov.ph With Subject: Request To Join The Pre-bid Conference Of Public Bidding No. 24-24. 7.bids Must Be Duly Received By The Bac Secretariat Through Manual Submission Of The Printed Copy Of The Bidding Documents, Along With A Usb Flash Drive Containing The Digital Copy Of The Technical Component In Pdf Format And An Excel File Of The Financial Component Requirements, On Or Before 10:00 Am On December 11, 2024, At The National Library Of The Philippines, Located At T.m. Kalaw St., Ermita, Manila. Late Bids Shall Not Be Accepted. 8.all Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9.bid Opening Shall Be On December 11, 2024, 10:01 Am At The 6th Floor Function Room, Nlp Building, T.m. Kalaw St., Ermita, Manila. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10.the Nlp Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11.for Further Information, Please Refer To: Maureen C. Terrenal Marie Joy H. Bestoir Eleanor C. Siyang Jonathan F. Santos Bac Secretariat National Library Of The Philippines Tel. No.: (02) 5314-2100 Loc. 114/406/412 Email: Bac@nlp.gov.ph Website: Https://web.nlp.gov.ph 12.you May Visit The Following Websites: For Downloading Of Bidding Document: Https://web.nlp.gov.ph/category/bids_opportunities/ Https://notices.philgeps.gov.ph/ (sgd.) Maricel M. Ureña Bac Chairperson Unit Description Quantity Supply, Installation, Testing And Commissioning Of Gas-based Fire Detection, Suppression And Control System For The 3rd Level Stack Room (cylinder & Gas-based Agent Only), 2nd Level Stack Room, And 4th Floor Children’s Library Of The National Library Of The Philippines Phase 5 A. Addressable Control Panel Imported Components: Kidde Brand, Ul/fm Approved Common Addressable Fire Suppression Control Panel Devices For Flouro-k System Unit Kidde Brand, Aries Netlink Multi-loop Remote Lcd Display And Control Module Rdcm), P/n 76-800300-001 (for Cave Theme Hallway, Children’s Library) 4 Unit Kidde Brand, Aries Netlink Multi-loop R-nac Card, P/n 76-800013-001 2 Unit Kidde Brand, Aries Mlx Multi-loop Slc Card, Supports 255 Addressable Devices With No Restriction On Device Type, P/n 76-800011-002 1 B. Fluoro-k System Imported Components: Kidde Brand, Ul/fm Approved 3rd Floor Stack Room (33.525 Mtrs X 18.763 Mtrs X 2.72 Mtrs) - (cylinder & Flouro-k Agent Only) Units Ecs-500 Fluoro-k Cylinder 900 Lb. (408.0 Kg) Capacity; 3" Valve, With Lli; Ul, Fm 45-550901-901 To Be Filled With 615 Lbs Fluoro-k Agent 4 Lbs Fk-5-1-12 Flouro-k Agent 47-190000-901 2,460 C. Fluoro-k System Imported Components: Kidde Brand, Ul/fm Approved 4f Children’s Library (1745.43 Cu.mtr.) - Room Space Protection (single Discharge) Units Ecs-500 Fluoro-k Cylinder 900 Lb. (408.0 Kg) Capacity; 3" Valve, With Lli; Ul, Fm 45-550901-901 To Be Filled With 630 Lbs Fluoro-k Agent 4 Lbs Fk-5-1-12 Flouro-k Agent 47-190000-901 2,520 Pc Kidde Brand, Electric Control Head, 24 Vdc, P/n Wk-890181-200 1 Pcs Kidde Brand, Pressure Operated Control Head, P/n 82-878737-000 3 Pc Kidde Master Cylinder Adapter Kit, 82-844895-000 1 Pcs Kidde Actuation Hose, 30”, Wk-264986-000 6 Pcs Kidde Male Connector, 5/16” Flare X 1/8” Npt 3 Pcs Kidde Male Elbow, 5/16” Flare X 1/8” Npt 3 Pcs Kidde Male Branch Tee, 5/16” Flare X 1/8” Npt 3 Pcs Ecs-360 Flouro-k Discharge Nozzles, Brass, 360º, 1-1/2" Npt (for Room Space) 16 Pcs Addressable Smartone Photoelectric Detector Ks-ps 12 Pcs Addressable Smartone 135f (57c) Fixed Temperature Heat Detector Ks-hd 12 Pcs Standard Base For Ds Series Detectors Ds-sb 24 Pcs Smartone Ai Monitor Module, 70-610001-001 4 Pcs Smartone Ao Control Module, 70-408004-001 12 Pcs Smartone Alarm Signal Module (asm), 70-210210-001 6 Pcs Kidde Brand, 3300 Addressable Dual Action Pull Station, 76-330002-101 3 Pcs Kidde Brand, Abort Station, P/n 84-878752-010 3 Pcs Kidde Brand, Eaton Wheelock Multi Tone-multi Strobe, 24 Vdc, Mt-24mcw-fr 6 Pcs Kidde Brand, Potter Vibrating Bell, 24 Vdc, 6-inch, P/n Mba-6-24 6 Pcs Gas Discharge Signage, 24 Vdc 3 Pcs Evacuation Signage, 24 Vdc 3 Pcs In-line Releasing-circuit Device, 06-220023-001 1 Pcs Fluoro-k Nameplate, Warning 2 D. Fluoro-k System Imported Components: Kidde Brand, Ul/fm Approved 4th Floor Cave Theme Hallway (15.41 Mtrs X 6.70 Mtrs X 2.20 Mtrs) - Room Space Protection (single Discharge) Unit Ecs-500 Fluoro-k Cylinder 350 Lb. (158.7 Kg) Capacity; 2" Valve, With Lli; Ul, Fm 45-550351-901 To Be Filled With 330 Lbs Flouro-k Agent 1 Lbs Fk-5-1-12 Fluoro-k Agent 47-190000-901 330 Pc Valve Outlet Adapter, 2”, P/n Wk-283905-000 1 Pc Kidde Brand, Electric Control Head, 24 Vdc, P/n Wk-890181-200 1 Pcs Ecs-360 Flouro-k Discharge Nozzles, Brass, 360º, 1-1/2" Npt (for Room Space) 2 Pcs Addressable Smartone Photoelectric Detector Ks-ps 3 Pcs Addressable Smartone 135f (57c) Fixed Temperature Heat Detector Ks-hd 3 Pcs Standard Base For Ds Series Detectors Ds-sb 6 Pcs Smartone Ai Monitor Module, 70-610001-001 2 Pcs Smartone Ao Control Module, 70-408004-001 4 Pcs Smartone Alarm Signal Module (asm), 70-210210-001 2 Pcs Kidde Brand, 3300 Addressable Dual Action Pull Station, 76-330002-101 2 Pcs Kidde Brand, Abort Station, P/n 84-878752-010 2 Pcs Kidde Brand, Eaton Wheelock Multi Tone-multi Strobe, 24 Vdc, Mt-24mcw-fr 4 Pcs Kidde Brand, Potter Vibrating Bell, 24 Vdc, 6-inch, P/n Mba-6-24 4 Pcs Gas Discharge Signage, 24 Vdc 2 Pcs Evacuation Signage, 24 Vdc 2 Pcs In-line Releasing-circuit Device, 06-220023-001 1 Pcs Fluoro-k Nameplate, Warning 1 E. Fluoro-k System Imported Components: Kidde Brand, Ul/fm Approved 4th Recording Room (3.36 Mtrs X 2.88 Mtrs X 2.70 Mtrs) - Room Space Protection (single Discharge) Unit Ecs-500 Fluoro-k Cylinder 500 Psi 40 Lb. (18.1 Kg), 1.5" Valve, No Lli; Ul, Fm 45-550041-901 To Be Filled With 39 Lbs Flouro-k Agent 1 Lbs Fk-5-1-12 Flouro-k Agent 47-190000-901 39 Pc Valve Outlet Adapter, 1-1/2”, P/n Wk-283904-000 1 Pc Kidde Brand, Electric Control Head, 24 Vdc, P/n Wk-890181-200 1 Pcs Ecs-360 Flouro-k Discharge Nozzles, Brass, 360º, 1" Npt (for Room Space) 1 Pcs Addressable Smartone Photoelectric Detector Ks-ps 2 Pcs Addressable Smartone 135f (57c) Fixed Temperature Heat Detector Ks-hd 2 Pcs Standard Base For Ds Series Detectors Ds-sb 4 Pcs Smartone Ai Monitor Module, 70-610001-001 1 Pcs Smartone Ao Control Module, 70-408004-001 2 Pcs Smartone Alarm Signal Module (asm), 70-210210-001 2 Pcs Kidde Brand, 3300 Addressable Dual Action Pull Station, 76-330002-101 1 Pcs Kidde Brand, Abort Station, P/n 84-878752-010 1 Pcs Kidde Brand, Eaton Wheelock Multi Tone-multi Strobe, 24 Vdc, Mt-24mcw-fr 1 Pcs Kidde Brand, Potter Vibrating Bell, 24 Vdc, 6-inch, P/n Mba-6-24 1 Pcs Gas Discharge Signage, 24 Vdc 1 Pcs Evacuation Signage, 24 Vdc 1 Pcs In-line Releasing-circuit Device, 06-220023-001 1 Pcs Flouro-k Nameplate, Warning 1 F. Fluoro-k System Imported Components: Kidde Brand, Ul/fm Approved 2nd Floor Stack Room (33.905 Mtrs X 18.354 Mtrs X 2.725 Mtrs) - Room Space Protection (single Discharge) Units Ecs-500 Fluoro-k Cylinder 900 Lb. (408.0 Kg) Capacity; 3" Valve, With Lli; Ul, Fm 45-550901-901 To Be Filled With 615 Lbs Flouro-k Agent 2 Lbs Fk-5-1-12 Flouro-k Agent 47-190000-901 1,230 Pc Kidde Brand, Electric Control Head, 24 Vdc, P/n Wk-890181-200 1 Pcs Kidde Brand, Pressure Operated Control Head, P/n 82-878737-000 3 Pc Kidde Master Cylinder Adapter Kit, 82-844895-000 1 Pcs Kidde Actuation Hose, 30”, Wk-264986-000 6 Pcs Kidde Male Connector, 5/16” Flare X 1/8” Npt 3 Pcs Kidde Male Elbow, 5/16” Flare X 1/8” Npt 3 Pcs Kidde Male Branch Tee, 5/16” Flare X 1/8” Npt 3 Pcs Ecs-360 Flouro-k Discharge Nozzles, Brass, 360º, 1-1/2" Npt (for Room Space) 16 Pcs Addressable Smartone Photoelectric Detector Ks-ps 16 Pcs Addressable Smartone 135f (57c) Fixed Temperature Heat Detector Ks-hd 16 Pcs Standard Base For Ds Series Detectors Ds-sb 32 Pcs Smartone Ai Monitor Module, 70-610001-001 4 Pcs Smartone Ao Control Module, 70-408004-001 12 Pcs Smartone Alarm Signal Module (asm), 70-210210-001 4 Pcs Kidde Brand, 3300 Addressable Dual Action Pull Station, 76-330002-101 2 Pcs Kidde Brand, Abort Station, P/n 84-878752-010 2 Pcs Kidde Brand, Eaton Wheelock Multi Tone-multi Strobe, 24 Vdc, Mt-24mcw-fr 2 Pcs Kidde Brand, Potter Vibrating Bell, 24 Vdc, 6-inch, P/n Mba-6-24 2 Pcs Gas Discharge Signage, 24 Vdc 2 Pcs Evacuation Signage, 24 Vdc 2 Pcs In-line Releasing-circuit Device, 06-220023-001 1 Pcs Flouro-k Nameplate, Warning 2 G. Local Materials & Labor Cost Local And Installation For Fire Suppression Control Panel And Its Accessories Lot Engineering Design, Testing And Commissioning Including Programming Of The System, Design As Per Nfpa 2001 And Computerized Flow Calculation And Supply Of Local Materials, Electro-mechanical Pipes Fitting With 3000 Lbs Capacity, Wires, Boxes Hanger And Other Related Materials To Complete The Installation 1 Lot Cylinder Rack Brackets 1 Lot Mechanical Piping System 1 Lot Fittings For At Least 3000 Lbs Capacity 1 Lot Pipes, Brackets, And Hangers 1 Lot Electrical Conduits, Boxes, Fittings, Wires & Anchors 1 Lot Labor Installation Including Testing, Commissioning, 1 Programming And Product Presentation H. General Requirements Lot Mobilization/demobilization 1 Lot Safety & Ppe 1 Lot As-built Plans & Drawings 1 Lot Bfp Fire Tax Fee 1 Lot Electric & Water Consumption During Construction 1 Lot Bonds & Insurances 1 Design The Design Shall Include The Following But Not Limited To : A)layout Plan B)process Flow Diagram C)process And Hydraulics Design Calculation D)civil And Structural Design E)electrical Design F)appropriate Instrumentation, Control And Automation G)shall Be Economical And Cost-effective Treatment Facility - Lowest Opex Cost H)all Ancillary Work Associated With The Fire Suppression System Reference Documents The Following Reference Documents Will Be Supplied For The Said Project: 1.as-built Drawing 2.design, Specification, And Standards Quality Assurance The Contractor Is Responsible For The Performance Of All Tests And Inspection Required By This Scope Of Work. In Addition, The Contractor Shall Be Required To Perform All Prescribed Test And Inspection Where Such Is Deemed Necessary To Ensure That Delivered Materials Conform To The Specifications, At The Contractor’s Expense. The Contractor Shall Furnish The Clients Certified Copies Of Records Showing That Each Material Has Been Pre-tested And Compliance Certificate Attesting That Delivered Materials Have Complied With All Applicable Requirements Of This Standard. The Contractor Shall, At His Own Expense, Replace All Rejected Materials For Failure To Comply With This Scope Of Work. Warranty The Contractor Shall Provide A Minimum Of One (1) Year Warranty On Work, Unless Otherwise Stated In This Section. Warranty Duration, Stated In This Section, Of The Said Work Shall Commence The Day Following The Final Acceptance Has Been Issued. Execution Installation, Start-up, Testing And Commissioning: 1.all Units Shall Be Delivered Ready For Operation/ Field Installation. 2.testing And Commissioning Shall Be Performed To Confirm Correct Operation. Training And Seminar The Contractor Shall Conduct Trainings To The Client’s Personnel/ Engineer In-charge For Five (5) Days To Cover The Use/operation And Maintenance Of The Work Under This Contract. Contract Duration The Contract Shall Complete The Work In __120__ Calendar Days From The Date Of Receipt Of Notice To Proceed Issued By The National Library Of The Philippines. Terms Of Payment Payment Will Be On Progress Billing Basis And Shall Constitute Full Compensation For Furnishing Of All Labor, Materials, Tools, Equipment And Other Services Required To Complete The Design, Supply And Installation/fire Suppression System. The Following Are The Terms Of Payment Agreement: A)fifteen Percent (15%) Of The Total Project Amount As An Advance Payment Upon Awarding Of The Project. Recoupment Of 15% Mobilization Fee Will Be Deducted From Every Progress Billing. B)fifty Percent (50%) Of The Total Project Amount Upon Completion Of 50% Of The Project. C)twenty Percent (20%) Of The Total Project Amount Upon Completion Of 70% Of The Project. 1.supply And Construction/ Installation Of All Civil And Electro-mechanical Works 2.furnishing Of All Labor, Materials, Tools, Transport And All Necessary Services To Complete All Civil Works Including Pipe Laying And Inter-connection Work, Electrical Work. D)ten Percent (10%) Of The Total Project Amount Upon Issue Of The Completion Certificate. E)five Percent (5%) Retention Fee Will Be Deducted For Every Progress Billing. Disclaimer The Right To Accept Or Reject Any Proposal, Annul The Biding Process And Reject All Applications, Discontinue The Negotiation Process Or Not To Award The Contract, At Any Time Without Thereby Incurring Any Liability To Applicants, Is Reserved. The Acceptance Of The Terms Hereunder Constitutes Acceptance Of The Reservation Hereunder.

City Government Iligan Tender

Civil And Construction...+1Building Construction
Philippines
Closing Date10 Dec 2024
Tender AmountPHP 3.8 Million (USD 65.5 K)
Details: Description Invitation To Bid The Iligan City Government Bids And Awards Committee (bac), Through Gen Fund-20% / Dev. Fund, Intend To Apply The Sum Of P 3,864,056.67 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Repair / Renovation Of Tourism Building (bahay Salakot), Buhanginan Hills, Brgy. Pala-o, Iligan City With Project No. Cb(b)-24-139 (ceo-infra). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Iligan City Government Bids And Awards Committee Now Invites For The Supply And Delivery Of Items Below-stated: Particulars Repair / Renovation Of Tourism Building (bahay Salakot), Buhanginan Hills, Brgy. Pala-o, Iligan City General Requirements •installation Of Project Billboard •occupational Safety And Health Program •mobilization And Demobilization •provision Of Field Office For The Engineer - Standard Engineer Field Camp, Office Table And Chair - Computer For Field Engineer Removal Of Structures And Obstruction •demolition Of Concrete Slab For Excavation Of Septic Tank •demolition Of Existing Chs Walls At Main Office (for W-04 •demolition Of Existing Drywall Partitions At Office •chipping Of Existing Toilet Tiles •removal Of Existing Windows And Doors •dismantling Of Existing Plumbing Appliances And Fixtures •demolition Of Kitchen Counter At Basement Earthworks •excavation Work For Septic Tank •gravel Bedding For Septic Tank •backfilling Of Common Soil Using Excavated Soil Must Be Compacted Layer By Layer Concrete Work, Formwork & Scaffolding •septic Tank •kitchen Sink Countertop Masonry Works •4” Reinforced Chs Wall @ Main Office •4” Reinforced Chs Wall @ Main Office Cr •4” Reinforced Chs Wall @ Basement Cr •4” Reinforced Chs Wall For Septic Tank Plastering Works •plaster-topping @ Priv. Rm & Printing Rm. •plaster Chs Wall On Both Sides @ Main Office •plaster Chs Wall On Both Sides @ Main Office Cr •plaster Chs Wall On Both Sides @ Basement Cr •plaster Chs Wall On One Side For Septic Tank Steel Reinforcements •10mm Dia. Rebars For Septic Tank's Masonry & Concrete Works •10mm Dia. Rebars For Additional Chs Walls Architectural Works •installation Of Wallpaper In Antique Gray Brick For Accent Wall •installation Of Solihiya Screen In Wood Framing •fabrication Of “viva Turismo Lligan” Acrylic Logo •installation Of Skirting Board/ Based Board Painting Works •semi-gloss Interior Paint Finish •flat Latex Paint- Primer For Ceiling Board •flat Latex Paint- Off-white Ceiling Finish @ Office •semi-gloss Paint- Off-white Ceiling Finish @ Both Toilet Ceiling Works •6mm Gypsum Board On Double Furring Framing @ 2nf Floor And Basement Toilet •9mm Gypsum Board On Double Furring Framing @ Main Office Built-ins And Cabinets •fabricate 1.475m X 2.4m- 3 Layers Shelves With 2 Door Cabinet And Drawers •fabricate 1.25m X 2.675m Overhead Shelf •fabricate 0.4 X 0.4 X 2.65m Ficem Board Plant Box •fabricate 0.5m X 0.5m X 1.2m Lavatory Counter Cabinet With Ceramic Tile Countertop •fabricate 1.45m X 1.05m 2 Layer Overhead Document Shelf Fabricate 0.6m X 1.45m Built-in Table Waterproofing •cementitious Waterproofing @ Toilet- Walls (5.13 Sqm) •cementitious Waterproofing @ Toilet- Flooring (5.42 Sqm) Tile Works •detachable Green Carpet (8.15 Sqm) •30cm X 60cm Non-slip Floor Tiles @ 2f Toilet •60cm X 60cm Non-slip Floor Tiles @ Basement Toilet •parquet Tiles- For The Demolished Walls •60cm X 60cm Dark Gray Carpet Tiles •300mm X 300mm Ceramic Wall Tiles @ 2f Toilet •200mm X 600mm Ceramic Wall Tiles @ Basement Toilet Electrical Works •installation Of Conduits , Junction Box , Utility Box •installation Of New Electrical Wire , Switches , Aircon Outlet •lnstallation Of Lighting Fixture According The Electrical Plan . Wood Balustrades And Handrail •top Railing: 75x25mm Solid Wood In Wood Stained Finish •balusters: 75x75mm Solid Wood In Wood Stained Finish Plumbing Works •installation Of Pvc Pipes ( Soil And Waste ) And G.i. Pipes For Water •installation Of Water Closets, Lavatory And Faucets •installation Of Kitchen Sink At Pantry Doors And Windows •remove And Replace Existing Doors, See Plan For Details •remove And Replace Existing Windows, See Plan For Details I.general Requirements A . Project Billboard (q = 1.00 Lot) Includes 4' X 8' Tarpaulin, 8' X 8' Tarpaulin, 2"x3"x 14" Coco Lumber, 2"x3"x10" Coco Lumber, 2"x2"x8" Coco Lumber, Assorted Sizes C.w. Nails. B. Occupational Safety And Health Program (q = 1.00 Lot) Includes Safety Shoes, Safety Helmet, Safety Gloves, Specialized Ppe. C.mobilization / Demobilization (q = 1.00 Lot) D. Facilities For The Engineer (q = 1.00 Lot) Includes Field Office For The Field Engineer: 4" X 4" Cocolumber, 2" X 4" Cocolumber, 2" X 3" Cocolumber, 2" X 2" Cocolumber, 1/4" Thk. Ord. Plywood, Ga 300 X 10' Corr.g.i. Sheet, Portland Cement, Washed Sand, Washed Gravel,4" Chb 700 Psi, 10mm Dsb, No. 16 G.i. Tie Wire, Assorted Sizes C.w. Nails, Empty Drum/ Fixtures, Monobloc Chairs, Office Table. Ii.removal Of Structures And Obstruction (q = 1.00 Lot) Includes Demolition Of Existing Chb Walls At Main Office (for W-04), Demolition Of Existing Drywall Partitions At Office, Chipping Of Existing Toilet Tiles, Removal Of Existing Windows And Doors, Dismantling Of Existing Plumbing Appliances And Fixtures, Demolition Of Kitchen Counter At Basement. Iii. Earthworks (q = 7.56 Cu.m.) Includes Excavation Works For Additional Septic Tank, Washed Gravel. Iv.concrete Works And Formworks (q = 2.02 Cu.m.) Includes Portland Cement, Washed Sand, Washed Gravel, Marine Plywood 12mm Thk. X 4' X 8', 2" X 3" X 8' Coco Lumber, 2" X 2" X 8' Coco Lumber, Assorted Sizes C.w. Nails. V.masonry Works (q = 48.54 Sq.m) Includes 4" Chb 350psi, Portland Cement, Washed Sand. Vi.plastering Works (q = 82.80 Sq.m) Includes Portland Cement, Washed Sand. Vii. Steel Reinforcements (q = 1.00 Lot) Includes 10mm Dia X 6m Rebar, No. 16 G.i. Tie Wire. Viii. Wood Balustrades And Handrail (q = 1.00 Lot) Includes Top Railing: 75x25mm Solid Wood In Wood Stained Finish, Balusters: 75x75mm Solid Wood In Wood Stained Finish, Paint Varnish, Paint Brush 2-1/2",assorted Sizes C.w. Nails. Ix.doors And Windows (q = 1.00 Lot) Includes D1- 3.2m X2.8m Brown Powder Coated Aluminum Framing W/ 10mm Clear Fixed Glass And Sliding Door With Complete Accessories; D2- 3.35m X2.55m Brown Powder Coated Aluminum Framing W/ 10mm Clear Fixed Glass And Sliding Door With Complete Accessories; D3- 0.7m X 2.1m Hollow Pvc Door With Door Jamb And Complete Accessories; D4- 0.8m X 2.1m Hollow Core Hdf Door With Door Jamb And Complete Accessories; D5- 0.7m X 2.4m Pocket Door: Solid Wood Door With 2mm X 5mm Grooves And Complete Accessories; D6- 0.7m X 2.1m Hollow Pvc Door With Door Jamb And Complete Accessories; W1- 2.345 X 1.2m Sliding Glass Window W/ Wooden Louver Casement Window: Sliding Window : 1x1" Brown Powder Coated Aluminum Frame, 2x2" Aluminum Mullions, 0.5x0.5" Aluminum Window Grilles, 6mm Clear Tempered Glass; Window Shutters: 4-panel Wooden Louvered Window Shutters, 2x2" Wood Framing; W2- 1.2m X 0.6m Black Powder Coated Aluminum Frame W/ 10mm Clear Glass Awning Window; W3- 0.7m X 2.1m Brown Powder Coated Aluminum Frame W/ 10mm Clear Glass Fixed Window; W4- 2.32m X 0.5m Louver Window : Brown Powder Coated Aluminum Frame W/ 5mm Clear Glass Blades; W5- 0.6m X 0.5m Black Powder Coated Aluminum Frame W/ 10mm Clear Glass Awning Window; W6- 4.7m X 1.27m Sliding Glass Window Casement Window X " Brown Powder Coated Aluminum Frame, 2x2" Aluminum Mullions, 0.5x0.5" Aluminum Window Grilles, 6mm Clear Tempered Glass; W7- 0.845m X 1.27m Fixed Glass Window Casement Window Sliding Window: 1x1" Brown Powder Coated Aluminum Frame, 2x2" Aluminum Mullions, 0.5x0.5" Aluminum Window Grilles, 6mm Clear Tempered Glass X.architectural Works (q = 1.00 Lot) Includes Wallpaper In Antique Gray Brick 15cm X 60cm, Wood Glue, M X 2.8m Solihiya Screen Partition In 2"x2" Wood Framing, M X 2.8m Solihiya Screen Partition In 2"x2" Wood Framing, 4.4m X 0.4m Solihiya Screen Partition In 2"xl" Wood Framing, "viva Turismo Ligan" Acylic Logo, Skirting Board/ Based Boardlin. X 4in. X8ft. Xi.painting Works (q = 209.8225 Sq.m) Includes Permacoat Flat Latex, Masonry Putty, Paint Brush 2-1/ 2 ",brush Roller (152mm), Sand Paper, Assorted Sizes, Tape Fiberglass Mesh (48mm X 30m), Gypsum Putty (5kg/gal), 2" X 3" X 8' Coco Lumber, 2" X 2" X 8' Coco Lumber, Assorted Sizes C.w. Nails. Xii.ceiling Works (q = 90.41 Sq.m) Includes 6mm Thick Gypsum Board 4'x8'; 9mm Thick Gypsum Board 4'x8'; Double Furring, 0.50mm Thk. X 19 X 50 X 19 X 5.00m; Channel Clip; Wall Angle 25 X 25 X 0.4 Mm (3m); Blind Rivets, 1000pcs/box; Riveter. Xiii.built-ins And Cabinets (q = 1.00 Lot) Includes 1.475m X 2.4m- 3 Layers Shelves With 2 Door Cabinet And Drawers, 1.25m X 2.675m Overhead Shelf, 0.4 X 0.4 X 2.65m Ficem Board Plant Box, 0.5m X 0.5m X 1.2m Lavatory Counter Cabinet With Ceramic Tile Countertop, 1.45m X 1.05m 2 Layer Overhead Document Shelf, 0.6m X 1.45m Built-in Table. Xiv.waterproofing (q = 10.55 Sq.m) Includes Portland Cement, Washed Sand, Wire Mesh 3.5mm X 1x1" X 6x20ft, Waterproofing Membrane (4 Kg). Xv.tile Works ( Q = 65.69 Sq.m) Includes Detachable Green Carpet, 300mm X 600mm Ceramic Floor Tiles (non-skid) @ 2f Toilet, 300mm X 300mm Ceramic Wall Tiles @ 2f Toilet, 600mm X 600mm Ceramic Floor Tiles (non-skid) @ Basement Toilet, 200mm X 600mm Ceramic Wall Tiles @ Basement Toilet, Tile Grout (2kg), Tile Adhessive 25kg (heavy Duty), Portland Cement, Washed Sand, Diamond Cutter Wheel, Parquet Tiles- For The Demolished Walls, 0.6m X 2.05m Kitchen Counter In Synthetic Marble Countertop Finish, 60cm X 60cm Dark Gray Carpet Tiles. Xvi.electrical Works ( Q = 1.00 Lot) Includes Electric Wire ,3.5mm2 Thhn Stranded Copper Wire; Electric Wire, 8.0mm2 Thhn Stranded Copper Wire; Electric Wire , 38.0mm2 Thhn Stranded Copper Wire; Switch , 1gang Switch W/led Set 10a 220v; Switch , 2 Gang Switch W/led Set 10a 220v; Switch , 3 Gang Switch W/led Set 10a 220v; Led Downllight 15w; Led Downlight 7w; 10w Rectangular Led Pendant Light Warm Light 1 X 4'; 3w Wall Mounted Led Light Daylight; Duplex Convenience Outlet; Gfci 20a 2 Gang Gfci Safety Outlet; Electrical Tape 3/4" X20yds; Solvent Cement 100cc; Pvc Conduit,15mm X3 Meters; Pvc Conduit Coupling (15mm)dia.; Pvc 90deg Elbow (15mm); Pvc Clamp (15mm) 100pc/pack; Junction Box, Pvc Octagonal W/ Cover 2"x4" Depth Type; Utility Box 2"x3" Depth Type W/ Cover; Circuit Breaker, 15at/50 Af, 2pcb, 230vac Bolt-on Type; Circuit Breaker 20at/50af, 2pcb, 230vac Bolt On Type; Circuit Breaker Soat/soaf, 2pcb, 230vac Bolt On Type; Circuit Breaker 125at/50af, 2pcb, 230vac Bolt On Type Tqd; Panelboard 8 Branches Bolt On Type 2 Pole With Tqd Main Breaker; Enclosure For Main Circuit Breaker 125at Tqd; Service Entrance Cap 25mm Dia. Emt; Emt Clamp (25mm); Tox With Screw Size 10; Emt Connector Set Screw Type 25mm; Emt Elbow 25mm; Cable Tie Black Nylon 100pc/pack; Secondary Rack 2 Pole Insulator; Grounding Rod 5/8" X4.75 Ft. With Clamp. Xvii . Plumbing Works ( Q = 1.00 Lot) Includes Two-piece Water Closet Close Coupled; Wall Hung Lavatory 450x400x140mm; Vessel Type Lavatory 450x400x140mm; Stainless Steel Sink 86x50cm , Heavy Duty; Bidet Spray, Hose & Hook Set Abs Material Chrome Plated 1.2m Hose Length, Heavy Duty;tissue Holder, Heavy Duty; Faucet Lavatory, Heavy Duty; Faucet Kitchen, Heavy Duty; Wall Faucet, Heavy Duty; Floor Strainer 100x150x2.7mm; 7.5 Pm Grease Trap And Accessories; Vanity Mirror For 2nd Floor Toilet; 4" Dia. Pvc Wye; 4" Dia. Pvc Clean Out; 4" Dia. Pvc Elbow, 1/8 Bend; 4" Dia. X 10' Pvc Pipe, S-1000; 2" Dia. Pvc P-trap; 2" Dia. Pvc Wye; 2" Dia. Pvc Tee; 2" Dia. Pvc Clean Out; 2" Dia. Pvc Elbow, 1/8 Bend; 2" Dia. X 10' Pvc Pipe, S-1000; 3 Way Angle Valve; Pvc Cement, 400cc; 1" Dia. G.i. Elbow; 1" Dia. G.i. Tee; " Dia. G.i. Coupling; 1" Dia. G.i. Caps, Banded; 1" Dia. X 20' G.i. Pipe; Teflon Tape (big). Approved Budget For The Contract (abc): P 3,864,056.67 Required Bid Security: 2% Of The Abc If Cash, Manager’s Check; Bank Draft/guarantee, Irrevocable Letter Of Credit Confirmed Or Authenticated By A Universal Or Commercial Bank; And 5% Of The Abc If Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security Delivery Period Is Within One Hundred (100) Calendar Days From Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Three (3) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. Interested Bidders May Obtain Further Information From Iligan City Government And Inspect The Bidding Documents During Office Hours From 8:00 A.m. – 12:00 P.m. And 1:00 P.m. – 5:00 P.m. At The Office Of The Bids And Awards Committee, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule 1. Issuance Of Bid Documents: November 19 – December 10, 2024 – 8:00 A.m. At Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. 2. Pre-bid Conference: November 26, 2024 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 3. Submission Of Bids: December 10, 2024 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 4. Opening Of Bids: December 10, 2024 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City A Complete Set Of Bidding Documents Will Be Available To Prospective Bidders Upon Payment Of A Non-refundable Amount Of P 5,000.00 To The Iligan City Government Cashier, At The Bac Office, 2nd Floor, City Hall Main Building, Buhanginan Hills, Pala-o, Iligan City. The Iligan City Government Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Furthermore, The City Government Of Iligan Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Or Loss Incurred In The Preparation And Submission Of The Eligibility Statements And Bids. Approved By: (signed)darwin J. Manubag, Phd. Bac Chairman Date Of Advertisement/posting: November 19, 2024 Place Of Posting/advertisement: City Hall/ibjt Bulletin Boards, Iligan Official Website, Phil-geps Itb No. 24-139 (ceo-infra)

Municipality Of Schenkend bern Tender

Others
Germany
Closing Soon28 Nov 2024
Tender AmountRefer Documents 
Details: According to Section 3 Paragraph 2 Item 1 of the Brandenburg Fire and Disaster Protection Act (bbgbkg), cities, authorities and municipalities must prepare a hazard and risk analysis and set protection goals in a hazard prevention requirements plan based on local conditions, which determine the personnel and material equipment of the volunteer fire brigade as well as the appropriate firefighting water supply. This is to be newly prepared for the municipality of Schenkendöbern. In the municipality of Schenkendöbern, around 3,900 residents live in 16 districts on a total area of 215.04 km². The volunteer fire brigade of the municipality of Schenkendöbern consists of 12 local fire brigades and 1 youth fire brigade with 4 local youth fire brigades. Service contents: 1. Hazard and risk analysis according to Bbgbkg 2. Determination of hazard types and risk analysis 3. Area analysis in km² (accessibility analysis) 4. Inspection and evaluation of fire stations 5. Operational availability analysis (personnel analysis) 6. Measures for the conception of the areas of emergency personnel, youth fire brigade, assessment of age structure, equipment, assessment of PPE, vehicles, fire stations and firefighting water supply 7. Number of on-site days to be determined 8. Presentation of the hazard prevention requirement plan to the municipal council and local fire chief advice for the municipality of Schenkendöbern

Municipality Of Argao, Cebu Tender

Manpower Supply
Philippines
Closing Date17 Dec 2024
Tender AmountPHP 2.5 Million (USD 42.6 K)
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 Ls 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 1.00 6.00 A. Backhoe (0.80 Mᶾ) 1.00 6.00 B. Dumptruck (12 Ydᶾ) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 Ls 1.00 L.s. Project Billboard/signboard Direct Cost: A. Materials: 64.00 Sq.ft. A. Tarpaulin (4' X 8') 37.00 Bd.ft. B. Lumber Coco 1.00 Kg C. Common Nails Assorted 2.00 Sheets D. Plywood Marine (1/4" X 4' X 8') B. Manpower: Number Of Days 4.00 1.00 A. Construction Foreman 4.00 1.00 B. Skilled Laborer 4.00 2.00 C. Unskilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Occupational Safety And Health Program Direct Cost: A. Materials: Ppe 2769.00 Man-days A. Safety Helmet 2769.00 Man-days B. Safety Shoes 2769.00 Man-days C. Working Gloves 1.00 Set E. First Aid Kit B. Manpower: Number Of Days 15.00 1.00 A. Safety Practitioner/officer (part Time) C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.3 Permits And Clearances Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Permits And Clearances Direct Cost: A. Materials: 1.00 L.s. Permits And Other Clearances - Building Permit Processing Fees Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 803(1)a Structure Excavation (common Soil) Quantity 4.40 M3 Dpwh Standard Output Per Hour (oph)= 20.00 M3 4.40 M3 Structure Excavation (common Soil) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. Backhoe (0.80 Mᶾ) 1.00 2.00 B. Dumptruck (12 Ydᶾ) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(1)a Embankment From Structure Excavation Quantity 4.40 M3 Dpwh Standard Output Per Hour (oph)= 9.84 M3 4.40 M3 Embankment From Structure Excavation Direct Cost: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 0.75 A. Plate Compactor (5 Hp) 1.00 0.75 B. Backhoe (0.80 M3) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(4) Gravel Bedding Quantity 9.60 M3 Dpwh Standard Output Per Hour (oph)= 1.20 M3 9.60 M3 Gravel Bedding Direct Cost: A. Materials: 1.05 M3 A. Gravel Bedding (g1)(w/5% Shrinkage Factor) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.50 1.00 A. Plate Compactor (5 Hp) 0.00 0.00 Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c2 " Structural Concrete (footing, Slab On Fill) " Quantity 19.80 M3 Dpwh Standard Output Per Hour (oph)= 0.36 M3 19.80 M3 " Structural Concrete (footing, Slab On Fill) " Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 6.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c4 " Structural Concrete (columns)" Quantity 1.73 M3 Dpwh Standard Output Per Hour (oph)= 0.36 M3 1.73 M3 " Structural Concrete (columns)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 902(1)" Reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Quantity 939.93 Kg Dpwh Standard Output Per Hour (oph)= 143.44 Kg 939.93 Kg " Reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Direct Cost: A. Materials: 1.00 Kg A. Deformed Reinforcing Steel - G40 0.02 Kg B. #16galvanized Iron Wire C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.50 1.00 A. Bar Cutter 0.50 1.00 B. Bar Bender Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 903 (2) Formworks And Falseworks Quantity 84.00 M2 Dpwh Standard Output Per Hour (oph)= 3.24 M2 84.00 M2 Formworks And Falseworks Direct Cost: A. Materials: 0.35 Pcs A. Ordinary Plywood - 3 Uses 7.19 Bd Ft B. Good Lumber - 3 Use 0.21 Kg C. Assorted Common Wire Nail D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Installation 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer Removal 0.41 1.00 A. Construction Foreman 0.41 6.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)b Structural Steel (roof Truss, Gi Pipe - Column, Rectangular Tube -for Walling, Strut & Strut Member) Quantity 1.00 L.s Dpwh Standard Output Per Hour (oph)= 1.00 L.s 1.00 L.s Structural Steel (roof Truss, Gi Pipe - Column, Rectangular Tube -for Walling, Strut & Strut Member) Direct Cost: A. Materials: 70.00 Length/s A. Structural Steel (angular Bar 2"x2'x3/16") 55.00 Length/s B. Structural Steel (angular Bar 1 1/2x1 1/2x3/16) 6.00 Length/s C.gi Pipe Sched 40(6") 48.00 Length/s D.12mm Deformed Bar 24.00 Length/s E.rectangular Tube 2"x3"*6meters 2.00 Tank F. Acetylene 2.00 Tank G. Oxygen 2.00 Box H. Welding Rod I. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Fabrication 6.00 1.00 A. Construction Foreman 6.00 2.00 B. Skilled Laborer 6.00 5.00 C. Unskilled Laborer Erection 6.00 3.00 A. Skilled Laborer 6.00 5.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 4.00 1.00 A. Welding Machine 4.00 1.00 B. Cutting Outfit 4.00 1.00 C. Truck Mounted Crane (20-25 Mt) Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)c Structural Steel Purlins (horizontal Support For Lighting Fixtures) Quantity 917.86 Kg Dpwh Standard Output Per Hour (oph)= 90.45 Kg 917.86 Kg Structural Steel Purlins (horizontal Support For Lighting Fixtures) Direct Cost: A. Materials: 1.05 Kg A. Structural Steel Framing Including Cross 0.02 Kg B. Acetylene 0.00 0 C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 2.00 A. Welding Machine Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (7)b Metal Structure Accessories (sag Rods) Quantity 56.96 Kg Dpwh Standard Output Per Hour (oph)= 12.995 Kg 56.96 Kg Metal Structure Accessories (sag Rods) Direct Cost: A. Materials: 1.05 Kg A. Sag Rods With Nuts & Bolts B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (4) Metal Structure Accessories (cross Bracing) Quantity 58.63 Kg Dpwh Standard Output Per Hour (oph)= 12.995 Kg 58.63 Kg Metal Structure Accessories (cross Bracing) Direct Cost: A. Materials: 1.05 Kg A. Cross Bracing B. Consumables (3% Of The Material Cost) B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (3)c Metal Structure Accessories (turnbuckle) Quantity 16.00 Each Dpwh Standard Output Per Hour (oph)= 1.000 Each 16.00 Each Metal Structure Accessories (turnbuckle) Direct Cost: A. Materials: 1.05 Kg A. Cross Bracing B. Consumables (3% Of The Material Cost) B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1014.00 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Quantity 210.60 M2 Dpwh Standard Output Per Hour (oph)= 2.769 M2 210.60 M2 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Direct Cost: A. Materials: 1.00 M A. Prepainted Metal Sheets (rib Type, Long Span, 0.427mm Thk. 10.00 Pc B. Tek Screw B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(1) Fabricated Metal Roofing Accessory (flashings& Metal Fascia) Quantity 58.00 M Dpwh Standard Output Per Hour (oph)= 10.600 M 58.00 M Fabricated Metal Roofing Accessory (flashings& Metal Fascia) Direct Cost: A. Materials: 1.05 M A. Flashings (bended) 1.05 M B.metal Fascia 19.00 Pc C. Blind Rivets D. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(2)c Fabricated Metal Roofing Accessory (gutter) Quantity 26.00 M Dpwh Standard Output Per Hour (oph)= 11.800 M 26.00 M Fabricated Metal Roofing Accessory (gutter) Direct Cost: A. Materials: 1.05 M A. Gutter (0.4 Mm) 3.00 Pc B. 12" X 1" Plain Gi Strap 16.00 Pc C. Blind Rivets D. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(2)a1 Fabricated Metal Roofing Accessory (ridge Roll) Quantity 13.00 M Dpwh Standard Output Per Hour (oph)= 11.800 M 13.00 M Fabricated Metal Roofing Accessory (ridge Roll) Direct Cost: A. Materials: 1.05 M A. Prepainted Ridge Roll, Ga. 24 (0.701mmx2.44mm) 19.00 Pc B. Blind Rivets 0.00 0 C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1038(1) " Reflective Insulation" Quantity 208.00 M2 Dpwh Standard Output Per Hour (oph)= 5.560 M2 208.00 M2 " Reflective Insulation" Direct Cost: A. Materials: 1.00 M2 A. Reflective Insulation B. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(1) 4.5mm Fiber Cement Board On Metal Frame Walling Quantity 450.90 M2 Dpwh Standard Output Per Hour (oph)= 1.243 M2 450.90 M2 4.5mm Fiber Cement Board On Metal Frame Walling Direct Cost: A. Materials: 0.37 Pc A. 4.5mm Fiber Cement Board 0.37 Pc B. Marine Plywood 1/4 14.00 Pc C. Rivets 4.00 Pc D. 1" Metal Screw B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(1)e2 Metal Spandrel On Metal Frame Walling Quantity 226.80 M2 Dpwh Standard Output Per Hour (oph)= 1.243 M2 226.80 M2 Metal Spandrel On Metal Frame Walling Direct Cost: A. Materials: 1.13 Pc "a.metal Tracks 5m Length " 0.36 Pc B. Metal Studs 5m 14.00 Pc C. Rivets 4.00 Pc D. 1" Metal Screw B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1009(1)a Jalousie (window Glass) Quantity 17.28 M2 Dpwh Standard Output Per Hour (oph)= 0.270 M2 17.28 M2 Jalousie (window Glass) Direct Cost: A. Materials: 1.00 M2 A.jalousie (window Glass, Inc. Jalousie Casing) B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1004(2) Finishing Hardware Quantity 1.00 L.s Dpwh Standard Output Per Hour (oph)= 1.000 L.s 1.00 L.s Finishing Hardware Direct Cost: A. Materials: 4.00 Set A.door Locks (schlage Or Equivalent) 12.00 Pc B. Hinge (50mmx101mm) B. Manpower: Number Of Hours Labor Cost For This Items Are To Be Considered/included In The Installations Of Doors, Windows & Other Fab. Materials Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1010 (4) Wooden Doors & Windows Quantity 1.00 L.s Dpwh Standard Output Per Hour (oph)= 1.000 L.s 1.00 L.s Wooden Doors & Windows Direct Cost: A. Materials: 1.00 Set A.door Jamb (d-1) (8 Sets) 1.00 Set B.window Jamb (w-1) C. Consumables (5% Of The Material Cost) B. Manpower: Number Of Hours 2.00 1.00 A. Construction Foreman 2.00 1.00 B. Skilled Laborer 2.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1010 (2)b Door (wooden Panel) Quantity 9.46 M2 Dpwh Standard Output Per Hour (oph)= 0.360 M2 9.46 M2 Door (wooden Panel) Direct Cost: A. Materials: 1.00 M2 A.wooden Panel Door B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1100(10) Conduit Works, Boxes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Hour (oph)= 1.000 I.s. 1.00 I.s. Conduit Works, Boxes And Fittings Direct Cost: A. Materials: 1.00 Length A. 25 Mm Ø X 3.00 M Rsc Pipe 80.00 Length B. 15 Mm Ø X 3.00 Mm Pvc Pipes 10.00 Pcs C. 15mm Ø Pvc Coupling 30.00 Pcs D. 15mm Ø Pvc Elbow 25.00 Pcs E. Utility Box 30.00 Pcs F. Junction Box 1.00 Pcs G. 25mm Ø Entrance Cap 0.00 0 H. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 47.39 1.00 A. Construction Foreman 47.39 1.00 B. Skilled Laborer 47.39 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1101(33) Wires And Wiring Devices Quantity 1.00 I.s. Dpwh Standard Output Per Hour (oph)= 1.000 I.s. 1.00 I.s. Wires And Wiring Devices Direct Cost: A. Materials: 220.00 M A.3.5 Mm2 Electric Wire Thhn 160.00 M B.5.5 Mm2 Electric Wire Thhn 25.00 M C. 8.00 Mm2 Electric Wire (thhn) 4.00 Set E. Two-gang Switch 16.00 Set G. Duplex Convenience Outlet H. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 28.05 1.00 A. Construction Foreman 28.05 1.00 B. Skilled Laborer 28.05 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1102(1) Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Quantity 1.00 Set Dpwh Standard Output Per Hour (oph)= 1.000 Set 1.00 Set Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Direct Cost: A. Materials: 1.00 Set A. Panel Board With Main Breaker And 8 Branches 50 Amp - 200 Amp 1.00 Pcs B. 60 Amp. Plug-in Breaker 2.00 Pcs B. 30 Amp. Plug-in Breaker 2.00 Pcs B. 20 Amp. Plug-in Breaker 2.00 Pcs B. 15 Amp. Plug-in Breaker 0.00 0 B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 5.50 1.00 A. Construction Foreman 5.50 1.00 B. Skilled Laborer 5.50 2.00 C. Unskilled Laborer Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1103(1) Lighting Fixtures Quantity 1.00 I.s. Dpwh Standard Output Per Hour (oph)= 1.000 I.s. 1.00 I.s. Lighting Fixtures Direct Cost: A. Materials: 19.00 Set A. 1-18 Watts Downlight/pinlight, Recessed Type 1.00 Units B. Emergency Lamp (twin Head) B. Manpower: Number Of Hours 29.00 1.00 A. Construction Foreman 29.00 1.00 B. Skilled Laborer 29.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)a Painting Works (masonry Painting) Quantity 226.80 M2 Dpwh Standard Output Per Hour (oph)= 2.100 M2 226.80 M2 Painting Works (masonry Painting) Direct Cost: A. Materials: 0.02 Gal A. Concrete Neutralizer 0.04 Gal B. Concrete Sealer/prime 0.05 Gal C. Patching Compound 0.08 Gal D. Semi Gloss Latex (two Coat Only) E. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)c Painting Works (metal Painting) Quantity 118.29 M2 Dpwh Standard Output Per Hour (oph)= 2.000 M2 118.29 M2 Painting Works (metal Painting) Direct Cost: A. Materials: 0.05 Gal A. Red Oxide Primer 0.10 Gal B. Enamel Paint 0.25 L C. Paint Thinner 0.00 0 D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)

Uthukela District Municipality Tender

Security and Emergency Services
South Africa
Closing Soon28 Nov 2024
Tender AmountRefer Documents 
Tender Id: TENDER 16-2024 PPE | Appointment Of Service Providers For Supplying And Delivery Of Personal Protective Clothing And Equipment For A Period Of 36 Months.pdf
331-340 of 335 active Tenders