Ppe Tenders
Ppe Tenders
City Of Cape Town Tender
Textile, Apparel and Footwear
South Africa
Details: Rfq Type Goods Goods Clothing, Ppe & Accessories Reference Number Ga12500344 Title Clothing Items Various Items Description 40 Pair X Gaitors Snake One Size Fits Most 20 Pair X Boots Working Uk 2 Fem Blk W/out T/cape 20 Pair X Boots Working Uk 3 Fem Blk W/out T/cape Specification* Refer To Ga12500344 Gaitors - Type Snake Size One Size Fits Most Specifications Must Extend From The Ankle And Protect From The Shoes To The Knee In Terms Of Its Length. Must Have A Flap That Covers The Shoelace Area. Gaitor To Consists Out Of Two Layers. Outer Shell To Be Made From A Heavy-duty Water Resistant Nylon Fabric. Together The Two Layers Must Be 100% Resistant To A Variety Of Venomous South African Snakes. Must Have At Least Three Adjustable Straps With Fasteners To Ensure A Secure Fit. 1. Nb The Municipal Bidding Document 6.1 (mbd 6.1) Is Attached, In Order To Be Eligible For Preference Points Bidders Are Required To Submit A Duly Completed Mbd 6.1 Document With Supporting Documents With Each And Every Rfq Submission, Failure To Submit Will Result In Zero Point Allocation. # Wherever Reference Is Made To Any Particular Trade Mark, Name, Patent, Design, Type, Specific Origin Or Producer, Such Reference Shall Be Deemed To Be Accompanied By The Words "or Equivalent" * Refer To Ga12500344 Boots - Type Working Size Uk 2 Gender Female Colour Black Toe Construction Without Toecape (soft Toe) Upper Material Minimum 2.0mm Chrome Tanned, Full Grain Buffalo Leather, Leather Should Be Tanned To Allow For Softer/more Comfortable Feel,fully Padded Collar And Padded ½ Bellows Tongue Should Give Additional Comfort And Support Ankles Sole Minimum 9.5mm Double Density Pu Injection, Shore Hardness For Flexibility And Slip Resistance, Should Also Be Oil And Chemical Resistant, A Reinforced Shank To Be Moulded Into The Midsole To Give Additional Support Under The Arch Of The Foot Lining Vamp Lining Must Have Perspiration Absorbency That Will Result In Low Heat Build-up, Should Be Treated To Impact Additional Hygienic, Anti-bacterial And Fungal Properties Standards Product To Be Manufactured According To Sans 20347 Or Equivalent Intergauteng Standard Packaging Boxes Are To Be Identified/marked With Content Description, Size Of Boots, Quanity Of Items In The Box, Cct Material Code And The Cct Purchase Order Number Specification Operations Requiring Wearing Safety Shoes For Entire Shift, Walking And Standing For Long Periods, Working In Wet Grass, On Warm Dry Soil, Deep Sand, In Workshops Etc. * Refer To Ga12500344 Boots - Type Working Size Uk 3 Gender Female Colour Black Toe Construction Without Toecape (soft Toe) Upper Material Minimum 2.0mm Chrome Tanned, Full Grain Buffalo Leather, Leather Should Be Tanned To Allow For Softer/more Comfortable Feel,fully Padded Collar And Padded ½ Bellows Tongue Should Give Additional Comfort And Support Ankles Sole Minimum 9.5mm Double Density Pu Injection, Shore Hardness For Flexibility And Slip Resistance, Should Also Be Oil And Chemical Resistant, A Reinforced Shank To Be Moulded Into The Midsole To Give Additional Support Under The Arch Of The Foot Lining Vamp Lining Must Have Perspiration Absorbency That Will Result In Low Heat Build-up, Should Be Treated To Impact Additional Hygienic, Anti-bacterial And Fungal Properties Standards Product To Be Manufactured According To Sans 20347 Or Equivalent Intergauteng Standard Packaging Boxes Are To Be Identified/marked With Content Description, Size Of Boots, Quanity Of Items In The Box, Cct Material Code And The Cct Purchase Order Number Specification Operations Requiring Wearing Safety Shoes For Entire Shift, Walking And Standing For Long Periods, Working In Wet Grass, On Warm Dry Soil, Deep Sand, In Workshops Etc. Delivery Date2025/01/29 Delivery Tologistics - Hillstar Warehouse Complex Materials Store / Ph 799 5200 Delivery Address1 Bamboesvlei Road, Ottery Contact Persontuleka Orli Mnyanda Telephone Number0214444502 Cell Number Closing Date2025/01/17 Closing Time03 00 Pm Rfq Submission Fax0000000000 Rfq Submission Fax 2 Buyer Email Addressga1.quotations@capetown.gov.za Buyer Detailsr.ross Buyer Phone0214009530 Attachments No Attachments Note On 1 November 2017 The City Of Cape Town Went Live With E-procurement Which Was Piloted With 3 Commodities Clothing, Building Hardware And Is&t. No Manual Submissions Will Be Accepted For These Commodities And Suppliers Must Log In To E-services Portal To Access Rfqs. Bids Must Be Compliant With The Preferential Procurement Regulations, 2017 Including But Not Limited To Local Content, Functionality, Price And Preference, Eligibility Criteria And Relevant Statutory Criteria. The Details Of This Are Contained In The Rfq Document And/or The Specification Advertised Via E-procurement. Only Locally Produced Goods Or Locally Manufactured Goods, Meeting The Stipulated Minimum Threshold For Local Production And Content, Will Be Considered, Where Applicable.
Closing Date17 Jan 2025
Tender AmountRefer Documents
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION USA Tender
Others
Corrigendum : Closing Date Modified
United States
Details: This Is A Modification 6 To The Synopsis Entitled Extravehicular Activity And Human Surface Mobility Technologies, Reference No. 80jsc022ehp Which Was Posted On September 23, 2022. You Are Notified That The Following Changes Are Made:
purpose:
extended The Response Date From 1/16/2025 To 1/16/2027.
the Due Date For Responses Is Extended.
offerors Are Responsible For Monitoring This Site For The Release Of The Solicitation And Any Amendments. Potential Offerors Are Responsible For Downloading Their Own Copy Of The Solicitation And Amendments.
***end Of Modification 6***
this Is A Modification 5 To The Synopsis Entitled Extravehicular Activity And Human Surface Mobility Technologies, Reference No. 80jsc022ehp Which Was Posted On September 23, 2022. You Are Notified That The Following Changes Are Made:
purpose:
this Is A Modification 5 To Update The Point Of Contact (poc) From:
contact Information:
technology Development And Partnerships Manager,
eva & Human Surface Mobility Program
email: Michael.a.berdich@nasa.gov
to:
contact Information:
technology Development And Partnerships Manager,
eva & Human Surface Mobility Program
email: Stephanie.a.sipila@nasa.gov
the Due Date For Responses Is Not Extended.
offerors Are Responsible For Monitoring This Site For The Release Of The Solicitation And Any Amendments. Potential Offerors Are Responsible For Downloading Their Own Copy Of The Solicitation And Amendments.
***end Of Modification 5***
this Is A Modification 4 To The Synopsis Entitled Extravehicular Activity And Human Surface Mobility Technologies, Reference No. 80jsc022ehp Which Was Posted On September 23, 2022. You Are Notified That The Following Changes Are Made:
correct The Modification 3
revise The Entry Titled “modification 2” To Reflect It As “modification 1.” Additionally, Incorporate Relevant Links In Bold Into This Entry.
the Following Link Https://nasajsc.secure.force.com/statementofinterest Is No Longer Valid Please Refer To The Link Below Titled: The Statement Of Interest In The Attachments/links Section.
purpose:
the Nasa Extravehicular Activity (eva) And Human Surface Mobility (hsm) Program (ehp) Seeks To Work With Partners To Advance The Technologies Associated With Human Surface Mobility In Support Of Nasa’s Artemis Missions. The Ehp Vision Is To Provide Safe, Reliable, And Effective Eva And Hsm Capabilities That Allow Astronauts To Survive And Work Outside The Confines Of A Spacecraft On And Around The Moon. Artemis Missions Will Return Humans To The Surface Of The Moon Using Innovative Technologies To Explore More Of The Lunar Surface Than Ever Before. We Will Collaborate With Commercial And International Partners And Establish The First Long-term Presence On The Moon. Then, We Will Use What We Learn On And Around The Moon To Take The Next Giant Leap: Sending The First Astronauts To Mars.
ehp Flight Projects Are Exploration Eva Suits (xeva Suits) And Tools, Lunar Terrain Vehicle (ltv), And Pressurized Rover (pr). For More Information, Reference The Ehp Website Here: Extravehicular Activity And Human Surface Mobility - Nasa (https://www.nasa.gov/extravehicular-activity-and-human-surface-mobility/).
the Ehp And Partners Will Collaborate On Developing Lunar Surface Capabilities To Reduce Risk And Increase Productivity Of Ehp Flight Projects During Artemis Missions. Focus Will Be On Technologies That Mitigate Risk For Lunar Surface Systems That Will Provide Mission Planners With More Choices, Thereby Increasing Mission Success. In Pursuing These Types Of Capabilities, Nasa And Potential Partners Will Develop New And Improved Technologies That Will Provide Additional Options For Terrestrial Applications In Multiple Industries.
additional Information:
ehp May Periodically Publish In Appendices To This Announcement Identifying Specific Technologies Under Current Development To Further Inform Potential Collaboration Opportunities. An Example Of One Such Technology Being Developed Is Described In Appendix A - Lunar Dust Level Sensor And Effects On Surfaces (ldes). For Access To This Export-controlled Document, Please Email The Points Of Contact Below.
ehp Periodically Places Informational Reference Documents That Relate To Lunar Human Surface Mobility Accessible By Industry In The Ehp Technical Library (https://eva.jsc.nasa.gov/). Access To The Technical Library Requires Login.gov Access. Follow The Prompts To Gain Access. Once Access Has Been Granted, The Informational Documents Related To This Announcement Is In The ‘ehp Technology Integration’ Folder, In Which You Will Find Information On The Following (major Updates To The Technical Library Content Will Also Be Updated Here):
- Ldes – Initial Ground Test Results Regarding The Magnitude Of Thermal Impact That Lunar Dust Has On Surfaces.
- 84s Lunar Terrain Model – A Terrain Model Of The Lunar South Pole (below The 84 South Latitude) Which Can Be Used As An Early Reference Data Set To Enable Initial Studies Of The Lunar Terrain.
additionally, Nasa Has Made Available To The Public The Digital Lunar Exploration Sites Unreal Simulation Tool (dust) Which Is An Early 3d Visualization Application Of The Lunar South Pole. Its Intended Use Is For Early Inspection, Mission Planning, And Analysis Of Lunar Landing And Traverse Sites For Hls And Artemis Base Camp. This Application And The Supporting Toolkit Built From Dust Are Used To Provide Distributable Lunar Environments And Tools To Support Rendering And Exporting Terrain, Multi-display Facilities, And Connections To Trick-based Simulations. It Can Be Attained At The Following Link: Digital Lunar Exploration Sites Unreal Simulation Tool (dust) Products(msc-27522-1) | Nasa Software Catalog (https://software.nasa.gov/software/msc-27522-1).
technology:
ehp Technology Goals Include, But Are Not Limited To, Overcoming Environmental And Long Mission Duration Challenges. Lunar Environmental Challenges Include Operating In Dust (lunar Regolith), Radiation, And Extreme Temperatures. Martian Environmental Challenges Are Operating In Martian Carbon Dioxide-rich Atmosphere And 1/3g, Driving The Need For Low Size, Weight, And Power. Long Mission Durations Drive Sustainability And Maintainability Challenges. Some Technology Areas Of Interest Include, But Are Not Limited To: Dust Mitigation Capabilities, Eva Systems, Local Relative Navigation, Increased Battery Capacity And Reduced Charge Time, And Advanced Mobility Concepts Capable Of Sustained Operation While Minimizing Maintenance In A Lunar Environment For An Extended Service Period. Each System Will Be Required To Operate In The Extreme Environment Of Cis-lunar Orbit And/or The Lunar South Pole, Including Inside Permanently Shadowed Regions (psrs) And Onto Mars.
intellectual Property (ip):
this Potential Partnership May Produce New Ip That Could Be Jointly Owned By Nasa And The Partner Or May Become The Property Of The Partner. Standard Clauses For Partnership Agreements Are Provided In The Appendices Of The Space Act Agreements Guide, Naii 1050-1. These Standard Clauses Are Usually Used Without Any Changes. Any Deviations From The Standard Intellectual Property Clauses Are Reviewed By Nasa Office Of The General Counsel At The Headquarters And/or Center-level, As Appropriate And Approved By Nasa Partnerships Office.
potential Commercial Applications:
lunar, Undersea, Automotive, Nuclear, Space Tourism, Personal Protective Equipment (ppe) …
keywords:
mobility, Spacesuit, Rover, Vehicle, Power Infrastructure, Sustainable, Dust, Communication Architecture, Relative Navigation And Localization, Regolith, Lunar Terrain Vehicle, Ltv, Pressurized Rover, Pr, Lunar, Artemis, Moon, Iss, Leo
contact Information:
technology Development And Partnerships Manager,
eva & Human Surface Mobility Program
email: Michael.a.berdich@nasa.gov
partnership Manager,
jsc’s Partnership Development Office
email: Jsc-partnerships@mail.nasa.gov
to Respond To This Announcement, Please Use The Statement Of Interest Form Found At
statement Of Interest (https://docs.google.com/forms/d/e/1faipqlsclwzeqitigc1wauvfvegkykseuozom0uofxtc60gk_giretq/viewform?usp=sharing)
to View All Co-development And Partnering Opportunities With The Nasa Johnson Space Center, Please Visit Our Website At
(https://www.nasa.gov/johnson/exploration/technology/co-development-and-partnering-opportunities)
the Due Date For Responses Is Not Extended.
offerors Are Responsible For Monitoring This Site For The Release Of The Solicitation And Any Amendments. Potential Offerors Are Responsible For Downloading Their Own Copy Of The Solicitation And Amendments.
***end Of Modification 4***
this Is A Modification 3 To The Synopsis Entitled Extravehicular Activity And Human Surface Mobility Technologies, Reference No. 80jsc022ehp Which Was Posted On September 23, 2022. You Are Notified That The Following Changes Are Made:
update Modifcation 2 In Its Entirety:
purpose:
the Nasa Extravehicular Activity (eva) And Human Surface Mobility (hsm) Program (ehp) Seeks To Work With Partners To Advance The Technologies Associated With Human Surface Mobility In Support Of Nasa’s Artemis Missions. The Ehp Vision Is To Provide Safe, Reliable, And Effective Eva And Hsm Capabilities That Allow Astronauts To Survive And Work Outside The Confines Of A Spacecraft On And Around The Moon. Artemis Missions Will Return Humans To The Surface Of The Moon Using Innovative Technologies To Explore More Of The Lunar Surface Than Ever Before. We Will Collaborate With Commercial And International Partners And Establish The First Long-term Presence On The Moon. Then, We Will Use What We Learn On And Around The Moon To Take The Next Giant Leap: Sending The First Astronauts To Mars.
ehp Flight Projects Are Exploration Eva Suits (xeva Suits) And Tools, Lunar Terrain Vehicle (ltv), And Pressurized Rover (pr). For More Information, Reference The Ehp Website Here: Extravehicular Activity And Human Surface Mobility - Nasa
the Ehp And Partners Will Collaborate On Developing Lunar Surface Capabilities To Reduce Risk And Increase Productivity Of Ehp Flight Projects During Artemis Missions. Focus Will Be On Technologies That Mitigate Risk For Lunar Surface Systems That Will Provide Mission Planners With More Choices, Thereby Increasing Mission Success. In Pursuing These Types Of Capabilities, Nasa And Potential Partners Will Develop New And Improved Technologies That Will Provide Additional Options For Terrestrial Applications In Multiple Industries.
additional Information:
ehp May Periodically Publish In Appendices To This Announcement Identifying Specific Technologies Under Current Development To Further Inform Potential Collaboration Opportunities. An Example Of One Such Technology Being Developed Is Described In Appendix A - Lunar Dust Level Sensor And Effects On Surfaces (ldes). For Access To This Export Controlled Document, Please Email The Points Of Contact Below.
ehp Periodically Places Informational Reference Documents That Relate To Lunar Human Surface Mobility Accessible By Industry In The Ehp Technical Library. Access To The Technical Library Requires Login.gov Access. Follow The Prompts To Gain Access. Once Access Has Been Granted, The Informational Documents Related To This Announcement Is In The ‘ehp Technology Integration’ Folder, In Which You Will Find Information On The Following (major Updates To The Technical Library Content Will Also Be Updated Here):
ldes – Initial Ground Test Results Regarding The Magnitude Of Thermal Impact That Lunar Dust Has On Surfaces.
84s Lunar Terrain Model – A Terrain Model Of The Lunar South Pole (below The 84 South Latitude) Which Can Be Used As An Early Reference Data Set To Enable Initial Studies Of The Lunar Terrain.
additionally, Nasa Has Made Available To The Public The Digital Lunar Exploration Sites Unreal Simulation Tool (dust) Which Is An Early 3d Visualization Application Of The Lunar South Pole. Its Intended Use Is For Early Inspection, Mission Planning, And Analysis Of Lunar Landing And Traverse Sites For Hls And Artemis Base Camp. This Application And The Supporting Toolkit Built From Dust Are Used To Provide Distributable Lunar Environments And Tools To Support Rendering And Exporting Terrain, Multi-display Facilities, And Connections To Trick-based Simulations. It Can Be Attained At The Following Link: Digital Lunar Exploration Sites Unreal Simulation Tool (dust) Products(msc-27522-1) | Nasa Software Catalog.
technology:
ehp Technology Goals Include, But Are Not Limited To, Overcoming Environmental And Long Mission Duration Challenges. Lunar Environmental Challenges Include Operating In Dust (lunar Regolith), Radiation, And Extreme Temperatures. Martian Environmental Challenges Are Operating In Martian Carbon Dioxide-rich Atmosphere And 1/3g, Driving The Need For Low Size, Weight, And Power. Long Mission Durations Drive Sustainability And Maintainability Challenges. Some Technology Areas Of Interest Include, But Are Not Limited To: Dust Mitigation Capabilities, Eva Systems, Local Relative Navigation, Increased Battery Capacity And Reduced Charge Time, And Advanced Mobility Concepts Capable Of Sustained Operation While Minimizing Maintenance In A Lunar Environment For An Extended Service Period. Each System Will Be Required To Operate In The Extreme Environment Of Cis-lunar Orbit And/or The Lunar South Pole, Including Inside Permanently Shadowed Regions (psrs) And Onto Mars.
intellectual Property (ip):
this Potential Partnership May Produce New Ip That Could Be Jointly Owned By Nasa And The Partner Or May Become The Property Of The Partner. Standard Clauses For Partnership Agreements Are Provided In The Appendices Of The Space Act Agreements Guide, Naii 1050-1. These Standard Clauses Are Usually Used Without Any Changes. Any Deviations From The Standard Intellectual Property Clauses Are Reviewed By Nasa Office Of The General Counsel At The Headquarters And/or Center-level, As Appropriate And Approved By Nasa Partnerships Office.
potential Commercial Applications:
lunar, Undersea, Automotive, Nuclear, Space Tourism, Personal Protective Equipment (ppe) …
keywords:
mobility, Spacesuit, Rover, Vehicle, Power Infrastructure, Sustainable, Dust, Communication Architecture, Relative Navigation And Localization, Regolith, Lunar Terrain Vehicle, Ltv, Pressurized Rover, Pr, Lunar, Artemis, Moon, Iss, Leo
contact Information:
technology Development And Partnerships Manager,
eva & Human Surface Mobility Program
email: Michael.a.berdich@nasa.gov
partnership Manager,
jsc’s Partnership Development Office
email: Jsc-partnerships@mail.nasa.gov
to Respond To This Announcement, Please Use The Statement Of Interest Form Found At
statementofinterest
to View All Co-development And Partnering Opportunities With The Nasa Johnson Space Center, Please Visit Our Website At
https://www.nasa.gov/johnson/exploration/technology/co-development-and-partnering-opportunities
extended The Response Date From 9/26/2024 To 1/16/2025
the Due Date For Responses Is Extended.
offerors Are Responsible For Monitoring This Site For The Release Of The Solicitation And Any Amendments. Potential Offerors Are Responsible For Downloading Their Own Copy Of The Solicitation And Amendments.
***** End Of Modification 3****
this Is A Modification 2 To The Synopsis Entitled Extravehicular Activity And Human Surface Mobility Technologies, Reference No. 80jsc022ehp Which Was Posted On September 23, 2022. You Are Notified That The Following Changes Are Made:
extended The Response Date From 9/26/2023 To 9/26/2024
the Due Date For Responses Is Extended.
offerors Are Responsible For Monitoring This Site For The Release Of The Solicitation And Any Amendments. Potential Offerors Are Responsible For Downloading Their Own Copy Of The Solicitation And Amendments.
*****end Of Modiffication 2 ******
this Is A Modification 1 To The Synopsis Entitled Extravehicular Activity And Human Surface Mobility Technologies, Reference No. 80jsc022ehp Which Was Posted On September 23, 2022. You Are Notified That The Following Changes Are Made:
new Attachment: Appendix A – Lunar Dust Level Sensor And Effects On Surfaces
new Purpose Statement Added In Bold.
the Due Date For Responses Is Not Extended.
offerors Are Responsible For Monitoring This Site For The Release Of Any New Special Notice.
purpose:
the Nasa Extravehicular Activity (eva) And Human Surface Mobility (hsm) Program (ehp) Seeks To Work With Partners To Advance The Technologies Associated With Human Mobility And Lunar Surface Infrastructure In Support Of Nasa’s Artemis Missions. The Ehp Vision Is To Provide Safe, Reliable, And Effective Eva And Hsm Capabilities That Allow Astronauts To Survive And Work Outside The Confines Of A Spacecraft On And Around The Moon. Artemis Missions Will Return Humans To The Surface Of The Moon Using Innovative Technologies To Explore More Of The Lunar Surface Than Ever Before. We Will Collaborate With Commercial And International Partners And Establish The First Long-term Presence On The Moon. Then, We Will Use What We Learn On And Around The Moon To Take The Next Giant Leap: Sending The First Astronauts To Mars.
the Ehp And Partners Will Collaborate On Developing Lunar Capabilities To Increase Productivity Of Relevant Systems Allowing Crew To Accomplish More During Artemis Missions. Focus Will Be On High-risk Technologies For Lunar Surface Systems That Will Provide Mission Planners With More Choices, Thereby Increasing Mission Success. In Pursuing These Types Of Capabilities, Nasa And Potential Partners Will Develop New And Improved Technologies That Will Provide Additional Options For Terrestrial Applications In Multiple Industries.
ehp May Periodically Publish In Appendices To This Announcement Identifying Specific Technologies Under Current Development To Further Inform Potential Collaboration Opportunities. An Example Of One Such Technology Being Developed Is Described In Appendix A - Lunar Dust Level Sensor And Effects On Surfaces (ldes).for Access To This Export Controlled Document, Please Email The Points Of Contact Below.
technology:
technology Goals Include, But Are Not Limited To: Dust Mitigation Capabilities, Eva Systems, Lunar Power And Communication Infrastructure, Local Relative Navigation, Increased Battery Capacity And Reduced Charge Time, And Advanced Mobility Concepts Capable Of Sustained Operation While Minimizing Maintenance In A Lunar Environment For An Extended Service Period. Each System Will Be Required To Operate In The Extreme Environment Of Cis-lunar Orbit And/or The Lunar South Pole, Including Inside Permanently Shadowed Regions (psrs) And Onto Mars.
intellectual Property (ip):
this Potential Partnership May Produce New Ip That Could Be Jointly Owned By Nasa And The Partner Or May Become The Property Of The Partner. Standard Clauses For Partnership Agreements Are Provided In The Appendices Of The Space Act Agreements Guide, Naii 1050-1. These Standard Clauses Are Usually Used Without Any Changes. Any Deviations From The Standard Intellectual Property Clauses Are Reviewed By Nasa Office Of The General Counsel At The Headquarters And/or Center-level, As Appropriate And Approved By Nasa Partnerships Office.
potential Commercial Applications:
lunar, Undersea, Automotive, Nuclear, Space Tourism, Personal Protective Equipment (ppe) …
keywords:
mobility, Spacesuit, Rover, Vehicle, Power Infrastructure, Sustainable, Dust, Communication Architecture, Relative Navigation And Localization, Regolith, Lunar Terrain Vehicle, Ltv, Pressurized Rover, Pr, Lunar, Artemis, Moon, Iss, Leo
to Respond To This Announcement, Please Use The Statement Of Interest Form Found At The Link Below.
to View All Co-development And Partnering Opportunities With The Nasa Johnson Space Center, Please Visit Our Website At
https://www.nasa.gov/johnson/exploration/technology/co-development-and-partnering-opportunities
Closing Date16 Jan 2027
Tender AmountRefer Documents
National Irrigation Administration Tender
Civil And Construction...+1Construction Material
Philippines
Details: Description Invitation To Bid For Supply And Delivery Of Construction Materials For Imelda Irrigation Project Cy 2025 Siay, Zamboanga Sibugay 1. The National Irrigation Administration – Zamboanga Sibugay Irrigation Management Office Through The Repair-cis Cy 2025 Intends To Apply The Sum Of (php 2,357,645.00) Two Million Three Hundred Fifty Seven Thousand Six Hundred Forty-five Pesos Only Being The Abc To Payments Under The Contract For Niareg9-12102024-line-projectcy2025-1001 (goods). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The National Irrigation Administration – Zamboanga Sibugay Irrigation Management Office Now Invites Bids For Item No. Quantity Unit Item Description 1 67.00 Bags Portland Cement (type 1) 2 7.00 Cu.m Gravel 3/4" Dia. 3 4.00 Cu.m Washed Sand 4 10.00 Pcs 1/2" Thk. Marine Plywood 5 60.00 Pcs Rsb 10mm Dia. X 6m Length 6 7.00 Kgs Ctw #16 7 8.00 Kgs Cwn 2" 8 5.00 Kgs Cwn 3" 9 6.00 Pcs Pvc Cement Pail 12" 10 1.00 Kg Nylon #90 11 5.00 Pcs Hacksaw Blade 12 10.00 Pcs Form Lumber 2" X 3" X 12' 13 20.00 Pcs Form Lumber 2" X 2" X 12' Temporary Works (bunkhouse & Bodega) 14 10.00 Pcs Form Lumber 2" X 3" X 12' 15 2.00 Sheets G.i. Plain Sheet (3' X 8') - Gauge 26 16 3.00 Bundles Nipa (25pcs/bundle) 17 5.00 Sheets Amakan 18 2.00 Bundles Rattan Strips 19 10.00 Pcs Bamboo Poles Construction Safety & Health 20 9.00 Pcs Safety Hard Hat: White 3 Pcs, Yellow 6 Pcs 21 10.00 Pcs Pvc Working Boots, Black 22 10.00 Pcs Construction Gloves 23 1.00 Set Ppe Signage (4' X 8') 24 1.00 Set Safety First (4' X 4') 25 1.00 Set Warning Signs (2' X 3') Supply, Delivery & Installation Of Standard Turn Out Steel Gates 26 45.00 Assembly Standard Turn Out Steel Gates Estimated Cost Php 2,357,645.00 The Above Procurement Project. Delivery Of The Goods Is Required By 90 Calendar Days. Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From National Irrigation Administration – Zamboanga Sibugay Irrigation Management Office And Inspect The Bidding Documents At The Address Given Below During 8:00 A.m. To 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 16, 2024 To January 6, 2024 At 5:00 P.m. From The Given Address And Website(s) Below National Irrigation Administration – Zamboanga Sibugay Irrigation Management Office, Da- Rfoix Research Division Compound Sanito, Ipil, Zamboanga Sibugay Notices.ps-philgeps.gov.ph, And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (php 5,000.00). One The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees Will Be Presented In Person, By Facsimile, Or Through Electronic Means. However, The Interested Bidder Can Purchase The Bidding Documents Only Upon Presentation Of An Original Copy Of Sworn Affidavit Of Site Inspection, And An Original Copy Of A Certificate Of Site Inspection Signed By The Nia Authorized Personnel Or The Irrigators Association President Certifying That The Bidder Has Actually Inspected The Project Site (prescribe Forms Can Be Availed From This Office). Photocopy Is Not Acceptable. Such Affidavit/s And Certificate/s Must Be Submitted For Verification To The Bac Secretariat. Only The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc Shall Be Authorized To Purchase And Submit Bidding Documents. The Use Of Special Power Of Attorney (spa) Is Prohibited As Per Nia Memorandum Circular No.52 Series 2014 Dated December 1, 2014. 6. The National Irrigation Administration – Zamboanga Sibugay Irrigation Management Office Will Hold A Pre-bid Conference On December 23, 2024 At 2:00 Pm At National Irrigation Administration – Da- Rfoix Research Division Compound Sanito, Ipil, Zamboanga Sibugay And/or Through Video Conferencing Or Webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through (i) Manual Submission At The Office Address Indicated Below On Or Before January 7, 2025 At 9:00 Am. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 7, 2025 At 9:00 Am At The Given Address Below National Irrigation Administration – Zamboanga Sibugay Irrigation Management Office, Da- Rfoix Research Division Compound Sanito, Ipil, Zamboanga Sibugay And/or Via Www.region9.nia.gov.ph, Google Meet. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The National Irrigation Administration – Zamboanga Sibugay Irrigation Management Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Wilson N. Cabrales National Irrigation Administration Zamboanga Sibugay Irrigation Management Office Zsimobac2020@yahoo.com / R9.zamboangasibugay@nia.gov.ph 09488713237 Https://region9.nia.gov.ph 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Https://notices.philgeps.gov.ph Or Https://region9.nia.gov.ph/content/invitation-bid ______________ [date Of Issue] Wilson N. Cabrales (sgd.) Bac - Chairperson
Closing Soon7 Jan 2025
Tender AmountPHP 2.3 Million (USD 40.4 K)
National Irrigation Administration Tender
Civil And Construction...+1Construction Material
Philippines
Details: Description Invitation To Bid For Supply And Delivery Of Construction Materials For Ditay-guinoman Cis Cy 2025 Diplahan, Zamboanga Sibugay 1. The National Irrigation Administration – Zamboanga Sibugay Irrigation Management Office Through The Repair-cis Cy 2025 Intends To Apply The Sum Of (php 1,835,495.00) One Million Eight Hundred Thirty Five Thousand Four Hundred Ninety Five Pesos Only Being The Abc To Payments Under The Contract For Niareg9-12102024-repair-ciscy2025-1000 (goods). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The National Irrigation Administration – Zamboanga Sibugay Irrigation Management Office Now Invites Bids For Item No. Quantity Unit Item Description 1 1,492.00 Bags Portland Cement (type 1) 2 154.00 Cu.m Gravel 3/4" Dia. 3 82.00 Cu.m Washed Sand 4 130.00 Pcs 12" Thk. Marine Plywood 5 44.00 Pcs Rsb 10mm Dia. X 6m Length 6 934.00 Pcs Rsb 12mm Dia. X 6m Length 7 16.00 Pcs Rsb 16mm Dia. X 6m Length 8 90.00 Kgs Ctw #16 9 85.00 Kgs Cwn 2" 10 80.00 Kgs Cwn 3" 11 60.00 Kgs Cwn 4" 12 40.00 Pcs Pvc Cement Pail 12" 13 5.00 Kgs Nylon #90 14 12.00 Pcs Hacksaw Blade 15 100.00 M Laminated Sacks 2m Width 16 280.00 Pcs Form Lumber 2" X 3" X 12' 17 400.00 Pcs Form Lumber 2" X 2" X 12' Temporary Works (bunkhouse & Bodega) 18 40.00 Pcs Form Lumber 2" X 3" X 12' 19 5.00 Sheets G.i. Plain Sheet (3' X 8') - Gauge 26 20 7.00 Bundles Nipa (25pcs/bundle) 21 10.00 Sheets Amakan 22 5.00 Bundles Rattan Strips 23 30.00 Pcs Bamboo Poles 24 1.00 Pc Toilet Bowl (ordinary) 25 1.00 Pc 200-l Capacity Plastic Drum (heavy Duty) Construction Safety & Health 26 23.00 Pcs Safety Hard Hat: White 5 Pcs, Yellow 18 Pcs 27 23.00 Pcs Pvc Working Boots, Black 28 23.00 Pcs Construction Gloves 29 1.00 Set Ppe Signage (4' X 8') 30 1.00 Set Safety First (4' X 4') 31 1.00 Set Warning Signs (2' X 3') Estimated Cost Php 1,835,495.00 The Above Procurement Project. Delivery Of The Goods Is Required By 120 Calendar Days. Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From National Irrigation Administration – Zamboanga Sibugay Irrigation Management Office And Inspect The Bidding Documents At The Address Given Below During 8:00 A.m. To 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 16, 2024 To January 6, 2025 At 5:00 P.m. From The Given Address And Website(s) Below National Irrigation Administration – Zamboanga Sibugay Irrigation Management Office, Da- Rfoix Research Division Compound Sanito, Ipil, Zamboanga Sibugay Notices.ps-philgeps.gov.ph, And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (php 5,000.00). One The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees Will Be Presented In Person, By Facsimile, Or Through Electronic Means. However, The Interested Bidder Can Purchase The Bidding Documents Only Upon Presentation Of An Original Copy Of Sworn Affidavit Of Site Inspection, And An Original Copy Of A Certificate Of Site Inspection Signed By The Nia Authorized Personnel Or The Irrigators Association President Certifying That The Bidder Has Actually Inspected The Project Site (prescribe Forms Can Be Availed From This Office). Photocopy Is Not Acceptable. Such Affidavit/s And Certificate/s Must Be Submitted For Verification To The Bac Secretariat. Only The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc Shall Be Authorized To Purchase And Submit Bidding Documents. The Use Of Special Power Of Attorney (spa) Is Prohibited As Per Nia Memorandum Circular No.52 Series 2014 Dated December 1, 2014. 6. The National Irrigation Administration – Zamboanga Sibugay Irrigation Management Office Will Hold A Pre-bid Conference On December 23, 2024 At 2:00 Pm At National Irrigation Administration – Da- Rfoix Research Division Compound Sanito, Ipil, Zamboanga Sibugay And/or Through Video Conferencing Or Webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through (i) Manual Submission At The Office Address Indicated Below On Or Before January 7, 2025 At 9:00 Am. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 7, 2025 At 9:00 Am At The Given Address Below National Irrigation Administration – Zamboanga Sibugay Irrigation Management Office, Da- Rfoix Research Division Compound Sanito, Ipil, Zamboanga Sibugay And/or Via Www.region9.nia.gov.ph, Google Meet. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The National Irrigation Administration – Zamboanga Sibugay Irrigation Management Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Wilson N. Cabrales National Irrigation Administration Zamboanga Sibugay Irrigation Management Office Zsimobac2020@yahoo.com / R9.zamboangasibugay@nia.gov.ph 09488713237 Https://region9.nia.gov.ph 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Https://notices.philgeps.gov.ph Or Https://region9.nia.gov.ph/content/invitation-bid ______________ [date Of Issue] Wilson N. Cabrales (sgd.) Bac - Chairperson
Closing Soon7 Jan 2025
Tender AmountPHP 1.8 Million (USD 31.4 K)
City Government Iligan Tender
Civil And Construction...+1Building Construction
Philippines
Details: Description Invitation To Bid The Iligan City Government Bids And Awards Committee (bac), Through General Fund , Intend To Apply The Sum Of P 1,932,276.10 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Construction Of Male And Female Headquarters - Soco (phase 1), Pnp Camp Tomas Cabili, Brgy. Tipanoy, Iligan City With Project No. Cb(b)-24-148 (ceo-infra). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Iligan City Government Bids And Awards Committee Now Invites For The Supply And Delivery Of Items Below-stated: Particulars Construction Of Male And Female Headquarters - Soco (phase 1), Pnp Camp Tomas Cabili, Brgy. Tipanoy, Iligan City 1. General Requirements • Permits And Clearances • Installation Of Project Billboard – 2 Sets • Occupational Safety And Health Program • Mobilization And Demobilization 2. Earthworks • Excavation Works For Footings, Tiebeams And Wall Footing • 100mm Thk. Gravel Base For Footings And Tiebeams • 50mm Thk. Gravel Base For Wall Footings 3. Steel Reinforcements • Installation Of 20mm Ø Dsb For Columns (6.50m), Tiebeams And Floor Beams (b1 & Cb) • Installation Of 16mm Ø Dsb For Footings, Tiebeams And Floor Beams (b1, B2, B3 & Cb) • Installation Of 10mm Ø Dsb For Tiebeams And Floor Beams Stirrups, Column Lateral Ties And Slab Matting For Second Floor 4. Concrete Works, Formworks And Scaffoldings • Installation Of Formworks And Falsework For Columns, Tiebeams, Beams (b1, B2, B3 & Cb) And Second Floor Slab • Concrete Pouring Of Footings, Columns (6.50m), Tiebeams, Floor Beams (b1, B2, B3 & Cb) And Second Floor Slab • Removal Of Formworks And Falsework • Installation Of 4” And 2” Pvc Pipes For Second Floor Plumbing Roughing-ins 5. Masonry Works • 4” X 8” X 16” Concrete Hollow Blocks For Perimeter Walls Up To Bottom Of Floor Beam I. Permit & Clearances (q = 1.00 Lumpsum) Includes Fire, Brgy. Clearance For Construction Fee, Professional Fee, White Print (a-3)- 6 Sets Of Plans. Ii. Construction Safety And Health Program (q= 1.00 Lumpsum) Includes Safety Shoes, Safety Helmet, Safety Gloves, Specialized Ppe, First Aid Kit & Medicines. Iii. Project Billboard (q=2.00 Set/s) Includes 4’x8’ Tarpaulin Print Billboard, 8’ X 8’ Tarpaulin Print Billboard, 2” X 2” X 8” Coco Lumber, 2” X 3” X 10” Coco Lumber, 2” X 3” X 14” Coco Lumber, Assorted Sizes C.w. Nails. Iv. Mobilization & Demobilization (q=1.00lot) V. Earthworks (q=95.00 Cu.m.) Includes Volume To Be Excavated, V=54.4 Cu.m.; Volume To Be Backfilled, V= 28.1cu.m.;gravel Bedding, V=10.83cu.m.; (+15% Shrinkage). Vi. Steel Reinforcements (q= 7,873.65kgs.) Includes 20mm Dia. X 6m Dsb, 16mm Dia. X 6m Dsb, 10mm Dia. X 6m Dsb, #16 G.i Tie Wire. Vii. Concrete Works, Formworks And Scaffoldings (q=45.17cu.m.) Includes Portland Cement (type I), Washed Sand, Washed Gravel, 4’ X 8’ X ¾” Thk. Marine Plywood, Assorted Sized Coco Lumber (2” X 2” X 10’ & 2” X 3” X 10’), Assorted Sized C.w. Nails, Sahara Cement Waterproofing Compound 908grams, Plumbing Roughing-ins-4” Dia. X 10’ Pvc Pipes S-1000, Plumbing Roughing-ins – 2”dia X 10’ Pvc Pipes S-1000. Viii. Masonry Works (q=100.65sq.m.) Includes 4” X 8” X 16” Chb (a = 100.65), Portland Cement, Washed Sand) Approved Budget For The Contract (abc): P 1,932,276.10 Required Bid Security: 2% Of The Abc If Cash, Manager’s Check; Bank Draft/guarantee, Irrevocable Letter Of Credit Confirmed Or Authenticated By A Universal Or Commercial Bank; And 5% Of The Abc If Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security Delivery Period Is Within One Hundred Ten (110) Calendar Days From Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Three (3) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. Interested Bidders May Obtain Further Information From Iligan City Government And Inspect The Bidding Documents During Office Hours From 8:00 A.m. – 12:00 P.m. And 1:00 P.m. – 5:00 P.m. At The Office Of The Bids And Awards Committee, Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule 1. Issuance Of Bid Documents: December 10, 2024 – January 7, 2025 – 8:00 A.m. At Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. 2. Pre-bid Conference :december 17, 2024 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 3. Submission Of Bids: January 7, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 4. Opening Of Bids: January 7, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City A Complete Set Of Bidding Documents Will Be Available To Prospective Bidders Upon Payment Of A Non-refundable Amount Of P 5,000.00 To The Iligan City Government Cashier, At The Bac Office, Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City.the Iligan City Government Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Furthermore, The City Government Of Iligan Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Or Loss Incurred In The Preparation And Submission Of The Eligibility Statements And Bids. Approved By: (signed)darwin J. Manubag, Phd. Bac Chairman Date Of Advertisement/posting: December 10, 2024 Place Of Posting/advertisement: City Hall/ibjt Bulletin Boards, Iligan Official Website, Phil-geps Itb No. 24-148 (ceo-infra)
Closing Soon7 Jan 2025
Tender AmountPHP 1.9 Million (USD 33.4 K)
City Government Iligan Tender
Civil And Construction...+2Building Construction, Construction Material
Philippines
Details: Description Invitation To Bid The Iligan City Government Bids And Awards Committee (bac), Through General Fund / Sb No. 1 Cy 2023 , Intend To Apply The Sum Of P 5,972,559.62 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Office Building (bahay Pag-asa Youth Home), Brgy. Abuno, Iligan City With Project No. Cb(b)-24-143 (ceo-infra). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Iligan City Government Bids And Awards Committee Now Invites For The Supply And Delivery Of Items Below-stated: Particulars Office Building (bahay Pag-asa Youth Home), Brgy. Abuno, Iligan City General Requirements • Permits And Clearances • Facilities For The Engineers • Installation Of Project Billboard – 2 Sets • Occupational Safety And Health Program • Mobilization And Demobilization Removal Of Obstructions • Clearing / Removal Of Boulders • Uprooting Of Trees Structural Excavation • Excavation Works For Footings, Wall Footings, Zocalo And Tie Beams Gravel Fill • 100mm Thk. Gravel Base For Footings And 50mm Thk. Gravel Base For Wall Footings Concrete Works, Formworks And Scaffolding • Concreting Pouring Using Readymix (3000 Psi) For Footings, Wall-footings, Tie Beams And Columns • Installation Of Formworks And False Works For Columns Beams And Tie Beams • Removal Of Formworks And Falseworks Steel Reinforcements • Installation Of 20mmø Dsb For Columns (c1), Footings (f1), And Tie Beams • Installation Of 16mmø Dsb For Columns (c2) And Footings (f2) • Installation Of 10mmø Dsb For Wall Footings (long Bars And Traverse Bars) Stirrups For Tie Beams And Lateral Ties For Columns Steel Reinforcements • Piling Of 4”thk Chb At 3.70m Height W/ 10mmø Dsb For Vertical And Horizontal Bars Spcd At 0.60m O.c Bothways I. Permit & Clearances (q=1.00 Lumpsum) Includes Fire, Brgy. Clearance For Construction Fee, Professional Fee, White Print (a-3)-6 Sets Of Plans, Cutting Of Trees. Ii. Construction Safety And Health Program (q=1.00 Lumpsum) Includes Safety Shoes, Safety Helmet, Safety Gloves, Specialized Ppe, First Aide Kit & Medicines. Iii. Project Billboard (q=2.00 Set/s) Includes 4’ X 8’ Tarpaulin Print Billboard, 8’ X 8’ Tarpaulin Print Billboard, 2” X 2” X 8” Coco Lumber, 2” X 3” X 10” Coco Lumber, 2” X 3” X 14” Coco Lumber, Assorted Sizes C.w Nails. Iv. Mobilization & Demobilization (q=1.00 Lot) V. Facilities For The Engineers (q=1.00 Lot) Includes The Contractor Shall Furnished Temporary Field Office/bunkhouse For The Use Of Field Engineers, Project-in-charge, Technical Personnel To Include Tables And Chairs, Latest Laptop Suitable For The Use Of Engineering Softwares And Other Related Facilities Provided By The Contractor: Field Office For The Field Engineer (standard Engineer Field Camp, Office Table And Chair); Laptop Computer For Field Engineer: Processor: 165hz 13th Gen Intel Core I9; Memory: 13900hx/16gb, 2 X 8 Gb, Ddr5; Storage: 4800 Mhz/ 1tb,m.2, Pcle Nvme; Graphics: Nvidia Geforce Rtx 4060, 8gb; Screen: 15.6” Fhd Ips 165hz Vi. Removal Of Structures And Grubbing (q=1.00 Lot) Includes Uprooting, Removal Of Boulders. Vii. Earthworks (q=535.00 Cu.m) Includes Volume To Be Excavated, V=286.00 Cu.m.; Volume To Be Backfilled, V=165.75 Cu.m.; Gravel Bedding, 1-1/2”ø, V=62.11cu.m. Viii. Steel Reinforcements (q=21,326.80kg/s) Includes 20mm Dia. X 6m Dsb, 16mm Dia. X 6m Dsb, 10mm Dia. X 6 Dsb, #16 G.i Tie Wire. Ix. Concrete Works, Formworks And Scaffoldings (q=133.10cu.m.) Includes Ready Mix Concrete – (3000 Psi @ 14 Days), 4’x8’x1/4” Thk. Marine Plywood, Coco Lumber (2” X 2” X 10’) – 833 Pcs, Assorted Sized C.w Nails. X. Masonry Works (q=281.64 Sqm.) Includes 4” X 8” X 16” Chb, A = 281.64 Sqm.; Portland Cement; Washed Sand Approved Budget For The Contract (abc): P 5,972,559.62 Required Bid Security: 2% Of The Abc If Cash, Manager’s Check; Bank Draft/guarantee, Irrevocable Letter Of Credit Confirmed Or Authenticated By A Universal Or Commercial Bank; And 5% Of The Abc If Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security Delivery Period Is Within One Hundred Ninety-four (194) Calendar Days From Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Three (3) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. Interested Bidders May Obtain Further Information From Iligan City Government And Inspect The Bidding Documents During Office Hours From 8:00 A.m. – 12:00 P.m. And 1:00 P.m. – 5:00 P.m. At The Office Of The Bids And Awards Committee, Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule 1. Pre-procurement: November 26, 2024 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 2. Issuance Of Bid Documents: December 10, 2024 – January 7, 2025 – 8:00 A.m. At Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. 3. Pre-bid Conference: December 17, 2024 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 4. Submission Of Bids: January 7, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 5. Opening Of Bids: January 7, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City A Complete Set Of Bidding Documents Will Be Available To Prospective Bidders Upon Payment Of A Non-refundable Amount Of P 10,000.00 To The Iligan City Government Cashier, At The Bac Office, Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City.the Iligan City Government Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Furthermore, The City Government Of Iligan Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Or Loss Incurred In The Preparation And Submission Of The Eligibility Statements And Bids. Approved By: (signed) Darwin J. Manubag, Phd. Bac Chairman Date Of Advertisement/posting: December 10, 2024 Place Of Posting/advertisement: City Hall/ibjt Bulletin Boards, Iligan Official Website, Phil-geps Itb No. 24-143 (ceo-infra)
Closing Soon7 Jan 2025
Tender AmountPHP 5.9 Million (USD 103.3 K)
National Irrigation Administration Tender
Civil And Construction...+1Construction Material
Philippines
Details: Description Invitation To Bid For Supply And Delivery Of Construction Materials For Sibuguey Valley Irrigation System – Repair Nis Cy 2025 – Package 3 Bayog, Zamboanga Del Sur 1. The National Irrigation Administration – Zamboanga Sibugay Irrigation Management Office Through The Repair - Nis Cy 2025 Intends To Apply The Sum Of (php 1,184,478.00) One Million One Hundred Eighty Four Thousand Four Hundred Seventy-eight Pesos Only Being The Abc To Payments Under The Contract For Niareg9-12102024-svis-repair-niscy2025p3-999 (goods). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The National Irrigation Administration – Zamboanga Sibugay Irrigation Management Office Now Invites Bids For Item No. Quantity Unit Item Description 1 648.00 Bags Portland Cement (type 1) 2 173.00 Cu.m Gravel 3/4" Dia. 3 33.00 Cu.m Washed Sand 4 80.00 Pcs Marine Plywood 1/2" Thickness 5 470.00 Pcs Rsb 10mm Dia. X 6m Length (g-40) 6 30.00 Kgs Ctw #16 7 30.00 Kgs Cwn 2" 8 30.00 Kgs Cwn 3" 9 25.00 Kgs Cwn 4" 10 17.00 Pcs Pvc Cement Pail 12" 11 2.00 Kgs Nylon #90 12 8.00 Pcs Hacksaw Blade 13 50.00 M Laminated Sacks 2m Width 14 130.00 Pcs Form Lumber 2" X 3" X 12' 15 240.00 Pcs Form Lumber 2" X 2" X 12' Temporary Works (bunkhouse & Bodega) 16 20.00 Pcs Form Lumber 2" X 3" X 12' 17 3.00 Sheets G.i. Plain Sheet (3' X 8') - Gauge 26 18 5.00 Bundles Nipa (25pcs/bundle) 19 5.00 Sheets Amakan 20 3.00 Bundles Rattan Strips 21 15.00 Pcs Bamboo Poles 22 1.00 Pc Bathroom Pail 23 1.00 Pc Toilet Bowl (ordinary) 24 1.00 Pc 200-l Capacity Plastic Drum (heavy Duty) Construction Safety & Health 25 15.00 Pcs Safety Hard Hat: White 3 Pcs, Yellow 12 Pcs 26 15.00 Pcs Pvc Working Boots, Black 27 15.00 Pcs Construction Gloves Signages 28 1.00 Set Ppe Signage (4' X 8') 29 1.00 Set Safety First (4' X 4') 30 1.00 Set Warning Signs (2' X 3') Radial Gate, Intake Gate And Railings 31 3.00 Pcs Neoprene Rubber Sheet 1m X 1m X 10mm Thickness 32 4.00 Pcs Angle Bar 2 1/2" X 1/4" X 6m Length 33 1.00 Pc Wire Rope 1/2" Dia. X 4m Length 34 1.00 Pc Copper Bar 2" Dia. X 12" Length 35 2.00 Pcs Copper Tube 3/8" Dia. X 2m Length 36 4.00 Pcs Brass Flare Nut Fitting 3/8" 37 8.00 Pcs G.i Pipe 2 1/2" Dia. X 6m Length 38 4.00 Pcs G.i Elbow 90 Degrees 2 1/2" Dia. 39 1.00 Box Welding Rod 6011 (10kgs) 40 1.00 Pc Oil 10 (1 Pail) 41 1.00 Pc Multi-purpose Grease (1 Pail) 42 4.00 Pcs Zinc Oxide Metal Primer (1 Gallon) 43 1.00 Pc Lacquer Thinner (1 Gallon) 44 4.00 Pcs Enamel Paint Color White (1 Gallon) 45 2.00 Pcs 3" Paint Brush 46 2.00 Pcs 2" Paint Brush 47 2.00 Pcs 1" Paint Brush 48 2.00 Pcs Paint Tray 49 5.00 Pcs Cutting Disc 4 1/2" Dia. Estimated Cost Php 1,184,478.00 The Above Procurement Project. Delivery Of The Goods Is Required By 90 Calendar Days. Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From National Irrigation Administration – Zamboanga Sibugay Irrigation Management Office And Inspect The Bidding Documents At The Address Given Below During 8:00 A.m. To 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 16, 2024 To January 6, 2025 At 5:00 P.m. From The Given Address And Website(s) Below National Irrigation Administration – Zamboanga Sibugay Irrigation Management Office, Da- Rfoix Research Division Compound Sanito, Ipil, Zamboanga Sibugay Notices.ps-philgeps.gov.ph, And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (php 5,000.00). One The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees Will Be Presented In Person, By Facsimile, Or Through Electronic Means. However, The Interested Bidder Can Purchase The Bidding Documents Only Upon Presentation Of An Original Copy Of Sworn Affidavit Of Site Inspection, And An Original Copy Of A Certificate Of Site Inspection Signed By The Nia Authorized Personnel Or The Irrigators Association President Certifying That The Bidder Has Actually Inspected The Project Site (prescribe Forms Can Be Availed From This Office). Photocopy Is Not Acceptable. Such Affidavit/s And Certificate/s Must Be Submitted For Verification To The Bac Secretariat. Only The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc Shall Be Authorized To Purchase And Submit Bidding Documents. The Use Of Special Power Of Attorney (spa) Is Prohibited As Per Nia Memorandum Circular No.52 Series 2014 Dated December 1, 2014. 6. The National Irrigation Administration – Zamboanga Sibugay Irrigation Management Office Will Hold A Pre-bid Conference On December 23, 2024 At 2:00 Pm At National Irrigation Administration – Da- Rfoix Research Division Compound Sanito, Ipil, Zamboanga Sibugay And/or Through Video Conferencing Or Webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through (i) Manual Submission At The Office Address Indicated Below On Or Before January 7, 2025 At 9:00 Am. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 7, 2025 At 9:00 Am At The Given Address Below National Irrigation Administration – Zamboanga Sibugay Irrigation Management Office, Da- Rfoix Research Division Compound Sanito, Ipil, Zamboanga Sibugay And/or Via Www.region9.nia.gov.ph, Google Meet. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The National Irrigation Administration – Zamboanga Sibugay Irrigation Management Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Wilson N. Cabrales National Irrigation Administration Zamboanga Sibugay Irrigation Management Office Zsimobac2020@yahoo.com / R9.zamboangasibugay@nia.gov.ph 09488713237 Https://region9.nia.gov.ph 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Https://notices.philgeps.gov.ph Or Https://region9.nia.gov.ph/content/invitation-bid ______________ [date Of Issue] Wilson N. Cabrales (sgd.) Bac Chairperson
Closing Soon7 Jan 2025
Tender AmountPHP 1.1 Million (USD 20.3 K)
Ministry Of The Interior Tender
Security and Emergency Services
Corrigendum : Closing Date Modified
France
Details: The purpose of this consultation is to provide cleaning services for the offices, educational areas, the infirmary, the gymnasium and the common areas of these four buildings (including toilets), corridors, reception areas including the annex room to the bar, meeting rooms and windows. These premises concern the educational, administrative, infirmary and gymnasium buildings (otherwise known as Excellence and Devotion for the first two) located within the grounds of the National Police School Park (hereinafter referred to as Ensp), 9 Rue Carnot – 69450 Saint Cyr Au Mont D'or. The supply of consumables for these services. As well as the supply of materials, personal protective equipment (PPE) and work clothing.
Closing Date20 Jan 2025
Tender AmountRefer Documents
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Healthcare and Medicine
United States
Details: This Is Not A Solicitation. This Is A Sources Sought Notice Only And Is Issued To Conduct Market Research And Gain Knowledge Of Current Market Capabilities. Responses To This Notice Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract. This Notice Is Issued Solely For Information And Planning Purposes And Does Not Constitute A Solicitation Or A Guarantee To Issue A Solicitation In The Future. This Notice Does Not Commit The Government To Contract For Any Supply Or Service. All Information Submitted In Response To This Announcement Is Voluntary; The Government Will Not Pay For Information Requested Nor Will It Compensate Any Respondent For Any Cost Incurred In Developing Information Provided To The Government. Not Responding To This Notice Does Not Preclude Participation In Any Future Solicitation, If Issued. This Announcement Is Based On The Best Information Available At This Time And Is Subject To Future Amendment.
the Department Of Veterans Affairs, Network Contracting Office 4, Is Conducting A Market Survey To Identify Potential Sources To Perform A Firm Fixed Price Contract For Procurement Of Scrub Dispensing Machines For The Lebanon Va Medical Center, 1700 S. Lincoln Ave., Lebanon, Pa 17042:
draft Requirements Description (not Comprehensive)
the Lebanon Va Medical Center Is Seeking To Procure A Contract For Scrub Dispensing Machines To Cover A Five-year Period.
description
the Lebanon Veterans Affairs Medical Center (lvamc), Located At 1400 S. Lincoln Avenue, Lebanon, Pa 17042, Has A Requirement For A Firm Fixed Price Five-year Idiq Requirements Contract For Automated Scrub Dispensing Machines.
the Contractor Shall Provide All Resources Necessary To Install And Maintain Four Automated Scrub Dispensing Machines, Eight Automated Return Units, And All Scrub Rentals To Include A Loss/replacement Program, Laundering, And Restocking Of The Dispensers. The Automated Dispensing Machines And Automated Return Units Shall Be Located Throughout The Lvamc.
the Contractor Shall Provide All Labor, Equipment, Tools, Materials, Supervision, And Technical Expertise Necessary To Maintain A Properly Managed Automated Dispensing And Scrub Rental Program.
place Of Performance:
department Of Veterans Affairs
lebanon Va Medical Center
1700 South Lincoln Ave
lebanon, Pa 17042
anticipated Period Of Performance:
year 1 - 05/10/2025 Through 05/09/2026
year 2 - 05/10/2026 Through 05/09/2027
year 3 - 05/10/2027 Through 05/09/2028
year 4 - 05/10/2028 Through 05/09/2029
year 5 - 05/10/2029 Through 05/09/2030
scope Of Work:
contractor Shall Provide The Lebanon Va Medical Center With Surgical Scrub Services. All Personnel, Equipment, Tools, Materials, Supervision Shall Be Provided By The Contractor. Contractor Shall Provide, Install, And Maintain Four Automated Scrub Dispensing Machines, Eight Automated Return Units, Along With All Scrub Rentals To Include An Auto-loss Replacement Program, Laundering And Restocking The Dispensers. The Contractor Shall Furnish Everything Needed To Perform This Contract According To All Its Terms.
all Automated Dispensing And Return Units Shall Adhere To The Provided Size Restraints Annotated Herein, And All Scrubs Shall Be Laundered, Folded And Tracked In Accordance With This Statement Of Work.
performance Requirements
the Contractor Shall Provide, Install, And Maintain To Ensure Proper Operations Of:
4 Automated Scrub Dispensers:
dispenser #1 Shall Fit Into The Dimensions Of 93 H X 158 W X 34 D
dispenser #2 Shall Fit Into The Dimensions Of 108 H X 158 W X 34 D
dispenser #3 Shall Fit Into The Dimensions Of 100 H X 79 W X 30 D
dispenser #4 Shall Fit Into The Dimensions Of 123 H X 112 W X 108 D
8 Automated Scrub Return Units:
return Unit #1 Shall Fit Into The Dimensions Of 94 H X 106 W X 30 D
return Unit #2 Shall Fit Into The Dimensions Of 96 H X 95.5 W X 29 D
return Unit #3 Shall Fit Into The Dimensions Of 109 H X 37 W X 24 D
return Unit #4 Shall Fit Into The Dimensions Of 108 H X 60 W X 33 D
return Unit #5 Shall Fit Into The Dimensions Of 100 H X 40 W X 25 D
return Unit #6 Shall Fit Into The Dimensions Of 100 H X 40 W X 25 D
return Unit #7 Shall Fit Into The Dimensions Of 123 H X 112 W X 108 D
return Unit #8 Shall Fit Into The Dimensions Of 123 H X 112 W X 108 D
the Contractor Shall Provide, Stock, Collect, Transport, Hygienically Launder, Fold, Individually Package In Poly Wrap, And Maintain Stock Of Contractor-owned Scrubs Of Various Sizes With Estimated:
minimum Annual Order Of 300,000 Scrubs
maximum Annual Order Of 800,000 Scrubs
the Contractor Shall Have The Ability To Track Weekly Use Of Garments Via An Electronic Monitoring System And Provide A Report Of Items Serviced Upon Request. The Contractor Shall Provide A Rental Program For Scrub Pants, Shirts And Jackets And Provide The Lvamc With An Auto-loss Replacement Policy To Replace Any Scrubs That May Become Damaged Or Deemed No Longer Usable.
detailed Performance Requirements
automated Scrub Dispensers
contractor Shall Deliver All Automated Scrub Dispensers To Proper Locations, Install, Program, Stock And Insure Proper Operations Of Every System.
the Dispensing Machine Units Shall Be Provided By The Contractor On A Rental Basis For As Long As The Contract Is In Place. The Machines Shall Be Installed, Serviced, And Maintained By The Contractor As Well As Be Fully Functional. If A Machine Has Any Technical Difficulties And/or Malfunctions, The Contractor Shall Make Every Effort To Properly Resolve The Issue By Coming On Site As Needed, As Well As Maintaining Open Communication With The Program Point Of Contact (poc) During This Process. The Contractor May Leave A Key To The Dispensing Machines With The Poc In Case Of A Malfunction, Requiring Them To Be Opened For Simple Fixes.
contractor Shall Gather Usage Data Through Input Collected At Each Station. The Collected Data Will Not Require Any Medical Staff Phi/pii Information. Contractor Shall Have No Need To Connect To The Lvamc Network. At No Time Will Patient Or Employee Information Be Shared With The Contractor.
contractor Shall Train All Necessary Staff On How To Properly Use The Dispenser/return Units.
dispenser Locations:
Dispenser #1 Shall Be Housed Within Building 1 Sterile Processing Service Department
Dispenser #2 Shall Be Housed Within Building 101 Operating Room
Dispenser #3 Shall Be Housed Within Building 17, 5th Floor, Dental
Dispenser #4 Shall Be Housed Within Building 101, Room 140
automated Scrub Returns
contractor Shall Deliver All Automated Scrub Returns To Proper Locations, Install, Program, Stock And Insure Proper Operations Of Every System.
the Return Machine Units Shall Be Provided By The Contractor On A Rental Basis For As Long As The
contract Is In Place. The Machines Shall Be Installed, Serviced, And Maintained By The Contractor As Well As Be Fully Functional. If A Machine Has Any Technical Difficulties And/or Malfunctions, The Contractor Shall Make Every Effort To Properly Resolve The Issue By Coming On Site As Needed, As Well As Maintaining Open Communication With The Poc During This Process. The Contractor May Leave A Key To The Return Machines With The Poc In Case Of A Malfunction And The Machine Would Need To Be Opened For Simple Fixes.
contractor Shall Gather Usage Data Thru Input Collected At Each Station. The Collected Data Will Not Require Any Medical Staff Phi/pii Information. Contractor Shall Have No Need To Connect To The Lvamc Network. At No Time Will Patient Or Employee Information Be Shared With The Contractor.
contractor Shall Train All Necessary Staff On How To Properly Use The Return Units.
return Locations:
Return Unit #1 And #2 Shall Be Housed Within Building 1 Sterile Processing Service
Department
Return Unit #3 Shall Be Housed Within Building 101 Operating Room Locker Room #1
Return Unit #4 Shall Be Housed Within Building 101 Operating Room Locker Room #2
Return Unit #5 Shall Be Housed Within Building 17, 5th Floor, Dental Lab
Return Unit #6 Shall Be Housed Within Building 17, 5th Floor, Dental Lab
Return Unit #7 Shall Be Housed Within Building 101, Room 140
Return Unit #8 Shall Be Housed Within Building 101, Room 140
scrubs
the Contractor Shall Be Capable Of Providing Hygienically Clean Scrubs Individually Folded And In Individually Poly-wrapped Packages. The Contractor Shall Have A Management System That Uses Barcoded Garments To Determine Lifecycle Of The Garments For Replacement And Be Capable Of Delivering Disinfected, Sterilized, And Cleaned Scrubs Within 24 Hours To The Facility.
contractor Shall Barcode Each Item To Maintain Precise Management Of Rental Garments In Accordance With Contractor S Regular Business Practices. Contractor Shall Sort And Stock/restock Clean Scrubs Into Dispensing Machines In Designated Areas Of The Medical Center. Contractor Shall Empty Out Soiled Items From The Return Units Located In Designated Areas Of The Medical Center. Contractor Shall Launder Scrubs To Infection Control Standards As Well As The Removal Of Foreign Material (e.g., Soil, And Organic Material) From Scrub Supply Using High-level Disinfection And Sterilization Process. Contractor Shall Also Provide Cleaned Scrubs With No Stained, Marked, Tinted, Or Any Other Foreign Material That Did Not Come With The Original Fabric Of The Surgical Scrubs. All Scrubs Shall Be Cleaned Within Hohenstein And Cdc Approved Standards.
each Item Shall Be Individually Folded And Individually Poly-wrapped Prior To Delivery. Each Item Shall Be Loaded Individually As To Allow For Mix Matching Of Sizes To Be Dispersed As Needed.
contractor Shall Track The Weekly Use Of Garments And Provide A Report Of What Items Have Been Serviced To The Poc Upon Request.
contractor Shall Have The Ability To Custom Tailor Garments To Fit Staffing Sizing Needs And
requirements. Each Dispenser Is To Stock Complete Sizes Of Scrub Sets, I.e. Extra Small, Small, Medium, Large, Extra-large, 2 Extra-large, 3 Extra-large, 4 Extra-large Etc. Request For More Or Less Of Certain Sizes Due To Employee Needs And/or New Sizes Of Scrubs, Due To Change Of Employees, Shall Be Communicated On A Written Request Through The Poc. Contractor Shall Fill The Dispensers To Their Full Capacity On Each Visit. Sizes For Each Dispenser Shall Be Adjusted Based On The Average Weekly Demand History After The Contract Is Awarded. The Contractor Shall Establish, Track, And Modify Distribution Based On Demand History.
the Contractor Shall Provide All Personnel, Rental Equipment, Tools, Materials, Supervision, Other Items And Services Necessary To Manage The Required Garments For Pick-up Three Times Per Week (mondays, Wednesdays And Fridays), Cleaning, Drop-off Three Times Per Week (mondays, Wednesdays And Fridays) And Restocking Of Cotton/polyester Blend Scrub Uniforms/scrub Jackets For The Lebanon Va Medical Center As Defined In This Statement Of Work.
the Following Scrub Colors Shall Be Available And Decided Upon Award Of Contract:
ceil Blue
royal Blue
navy
steel Grey
teal
black
forecasted Demand Per Dispenser By Size:
regular Sizes
4-xl-5%
3-xl-5%
2-xl 10%
xl-25%
large 25%
medium 10%
small-5%
extra Small-5%
hours Of Operation
the Contractor Shall Perform The Tasks As Required By The Sow Under This Contract During The Following Hours: Monday, Wednesday, And Friday Between 6:00am, Et, And 2:30pm, Et, Unless Other Time Is Specified.
holidays: Delivery Of Scrubs Shall Not Occur On Federal Holidays. Should A Delivery Be Regularly Scheduled On A Holiday, The Delivery Shall Occur On The Workday Prior To The Holiday. The Observed Federal Government Holidays Are: New Year S Day, Martin Luther King Jr. Day, Presidents Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day,
veterans Day, Thanksgiving Day, And Christmas Day. When Such Holiday Falls On First Non-workday, The Preceding Workday Shall Be Considered A Holiday. When Such Holiday Falls On The Second Non-workday, The Next Workday Shall Be Considered A Holiday.
a Special Event Or Adjusted Work Hours: If Circumstances Should Arise Wherein The Contractor Desires A Different Work Schedule As Required, The Contractor Shall Request This In Writing. Submit A Written Request To The Government Poc A Minimum Of 72 Hours Before The Requested Adjusted Work Schedule, To Include Inclement Weather.
general Information
quality Control
the Contractor Shall Monitor Its Employees' Performance And Based Upon The Results Of Such
monitoring, Shall Establish Performance Improvement Activities To Assure Employee Efficiency And Knowledge Meets Standards. Contractor Shall Ensure Employees Are Performing Their Duties In A Manner Consistent With All Federal, State, And Local Rules And Regulations As Set Forth By Applicable Regulatory Agencies And This Contractual Agreement.
quality Assurance
if The Government Performs Inspections Or Tests On The Premises Of The Contractor, The
contractor Shall Furnish, Without Additional Charge, All Reasonable Facilities And Assistance For
the Safe And Convenient Performance Of These Duties.
infection Control
all Laundering Employees, Including Truck Drivers, Shall Be Educated As Well As Practice Proper
hand-washing Techniques And Shall Also Participate In Educational Programs To Learn About Blood Borne-pathogen Management And The Use Of Personal Protective Equipment (ppe). Care Shall Be Taken To Contain Pathogens During Transport (separation Of Clean From Soiled), Efforts To Avoid Cross Contamination Between Soiled And Clean Items And Use Of A Consistent Thorough Wash Process. A Quality Assurance Program Shall Be Used To Ensure Life Of Textile Is Not Exceeded Per Manufacture Recommendations. Transportation Of Any Scrubs Shall Be Covered With Heavy Plastic Prior To Leaving The Plant To Avoid Any Pathogen Contamination And Handled In Accordance With Industry Best Practice To Ensure That They Remain Hygienically Clean. This Includes The Use Of A Truck Dedicated To Healthcare Transport And Proper Use Of Personal Protective Equipment (ppe).
inspections
the Government, At All Reasonable Times, Shall Have Access And Permission To Inspect The Delivery Truck And Carts.
contractor Staff Information
the Contractor Shall Provide A Contract Manager Who Shall Be Responsible For The Performance Of The Work. The Name Of This Person, And An Alternate Or Alternates, Who Shall Act For The Contractor When The Manager Is Absent, Shall Be Designated In Writing To The Contracting Officer. The Contract Manager Or Alternate Shall Have Full Authority To Act For The Contractor On All Contract Matters Relating To Daily Operation Of This Contract. The Contract Manager And Alternate Or Alternates Shall Be Able To Read, Write, Speak, And Understand The English Language.
uniforms
all Employees Shall Wear Contractor Provided Uniforms (contractor Code Of Dress), Which Include Pants, Shirts Or Blouses, And Protective Clothing Which Are Clearly Distinguishable From Other Lvamc Uniforms Currently In Use. The Uniform Shall Be Worn As Designed By The Manufacturer. Open Toe Shoes Or Sandals Shall Not Be Worn. A Basic Leather Shoe Covering The Entire Foot Is Recommended. All Personnel Shall Display Identification Badges On Their Uniforms, Which Will Show The Employee S Last Name And The Contractor S Full Name.
personal Hygiene
contractor S Personnel Shall Be Clean, Bathe Daily (including Hair), And Wear A Clean Uniform Daily. Fingernails Shall Be Clean And Free Of Dirt. Hair Shall Be Neatly Trimmed And Combed.
security Requirements
the Contractor S Employees Shall Wear Visible Identification At All Times While On The Premises. It Is The Responsibility Of The Contractor To Park In The Appropriate Designated Parking Areas. The Department Of Veterans Affairs Shall Not Invalidate Or Make Reimbursement For Parking Violations Of The Contractor Under Any Conditions. Smoking Is Prohibited On Va Grounds. Possession Of Weapons Is Prohibited. Violations Of Va Regulations May Result In Citation Answerable In The United States (federal) District Court, Not A Local District, State, Or Municipal Court. All Contractor Employees Performing Tasks Related To This Sow, While On Lvamc Property, Shall Have Proper Valid Identification. All Applicable Background Checks Shall Be Completed Before Contractor Employees May Begin Work. Badges After Security Clearances Shall Be Worn At All Times While On Va Grounds.
damage
extreme Caution Shall Be Exercised To Prevent Damage To The Building And Its Contents. Any Damage Shall Be Reported To The Poc Immediately For Appropriate Action. Any Damage Caused By The Contractor Shall Be Repaired And Or Replaced To The Satisfaction Of The Va At The Contractor S Expense. Damage To The Building, Its Contents Or Loss Of Government Property In Excess Of $100,000 Shall Require A Report Of Survey Or Investigation Report By The Vacc. Appropriate Government Personnel Shall Conduct The Investigation. The Responsible Party Shall Be Required To Replace And/or Submit Payment For Damage Or Loss.
access (keys)
if The Poc Provides Keys For Access, It Shall Be The Contractors Responsibility To Safeguard And Control Keys Provided.
capabilities Statement And Documentation:
companies Are Invited To Provide Their Capabilities, Experience, And Knowledge In The Provision Of Scrub Dispensing Machines. Sources Are Asked To Provide Information To Demonstrate Their Answers To The Following Items Of Information:
1. General Information About Your Company To Include:
company Name:
company Address:
socioeconomic Status:
gsa Contract Number Covering These Services And Expiration Date (if Applicable):
company Unique Equity Identifier (uei):
company Naics Code(s):
point Of Contact Name:
point Of Contact Phone Number:
point Of Contact Email Address:
company Website (if Available):
2. The North American Industry Classification System Code (naics) Is 812332 (industrial Launderers), And The Small Business Size Standard Is $47 Million.
3. Based On Market Response, The Following Clauses May Be Included In A Resulting Solicitation, Should One Be Issued:
vaar 852.219-10, Va Notice Of Total Service-disabled Veteran-owned Small Business Set-aside.
vaar 852.219-11, Va Notice Of Total Veteran-owned Small Business Set-aside.
far 52.219-6, Notice Of Total Small Business Set-aside.
accordingly, Prospective Contractors Will Be Required At Time Of Solicitation Response To Certify To The Applicable Limitation On Subcontracting Requirements In 13 Cfr 125.6, With Reference To The Appropriate Set-aside. Please Include In The Response To This Sources Sought Notice Your Ability Or Inability To Certify To The Clause Applicable To Your Organization.
4. Provide A Summary Of Your Firm S Ability To Provide The Services Described In This Announcement. In Addition To A Capability Statement, Submissions Can Include Specifications, Brochures, And Manuals As Attachments.
submit Responses Via Email Only To Contracting Officer Stephanie Mcfadden At Stephanie.mcfadden@va.gov, No Later Than 1:00 Pm Est, Tuesday, January 14, 2025, With Sources Sought Number 36c24425q0186 In The Subject Line. Telephone Responses And/or Questions Shall Not Be Accepted. The Government Will Not Provide Feedback In Response To Vendor Questions About The Requirement At This Time. If You Identify Ambiguities Or Have Concerns About Anything In The Description Of The Requirement, However, Please Include Them With Your Response. Confirming Receipt Of The Response Is The Responsibility Of The Contractor. Contact The Contract Specialist If The Government Does Not Confirm Receipt Of The Sources Sought Response Within 2 Business Days.
simply Responding As An Interested Party Does Not Constitute Your Company As A Source. Prospective Contractors Must Provide The Above Requested Information. After Review Of The Responses To This Sources Sought Notice, A Solicitation Announcement May Be Published On The Sam, Nasa Sewp V Or Gsa Websites In The Near Future. Responses To This Sources Sought Notice Are Not Considered Adequate Responses To A Solicitation Announcement. All Prospective Contractors Are Required To Respond To A Solicitation Announcement In Addition To Responding To This Sources Sought Notice.
prospective Contractors Are Reminded That In Accordance With Far 4.11 They Shall Be Registered In The System For Award Management (sam) Database And Shall Complete Electronic Annual Representations And Certifications In Sam Prior To Award Of A Contract. Sam Is Located At Https://sam.gov/sam/ And Consolidated The Capabilities Of Ccr/fedreg, Orca, And Epls. There Is No Cost To Use Sam.
no Solicitation Document Is Available At This Time; This Notice Is To Acquire Information Only.
Closing Soon14 Jan 2025
Tender AmountRefer Documents
City Government Iligan Tender
Civil And Construction...+1Civil Works Others
Philippines
Details: Description Invitation To Bid The Iligan City Government Bids And Awards Committee (bac), Through General Fund / Sb No. 2 Cy 2024 , Intend To Apply The Sum Of P 3,381,096.77 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Improvement Of Stairs At Buhanginan Hills (near Girlscout Headquarters), Buhanginan Hills, Brgy. Pala-o, Iligan City With Project No. Cb(b)-24-149 (ceo-infra). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Iligan City Government Bids And Awards Committee Now Invites For The Supply And Delivery Of Items Below-stated: Particulars Improvement Of Stairs At Buhanginan Hills (near Girlscout Headquarters), Buhanginan Hills, Brgy. Pala-o, Iligan City General Requirements •permits And Clearances •facilities For The Engineers •installation Of Project Billboard- 2 Sets •occupational Safety And Health Program •mobilization And Demobilization Removal Of Obstructions •clearing/removal Of Obstruction •uprooting/cutting Of Trees Gravel Fill •100 Mm Thk. Gravel Base For Footings And Zocalo •75 Mm Thk. Gravel Base For Bench, Footing And Plantbox Flooring •50 Mm Thk . Gravel Base For Stair Steps Electrical Works •laying Of The Underground Or Overhead Power Cables Connecting To The Main Power Supply •installation Of Protection System And Outdoor Electrical'panel (nema Enclosure W/ 15at Circuit Breaker) •erection Of Modem-type Outdoor Lamp Posts And Bollards (including Foundations And Anchor Bolts) •complete Wiring Of The Luminaire To The Electrical Supply •installation Of Outdoor Junction Boxes For Protection And Organization •underground Cable Burial Or Concrete-embedding Of Cable For Cable Routing •proper Grounding Of The Lamp Posts,electrical Panel, And Other Metal Parts For Safety •concrete Pouring For Footings, Zocalo,columns, 75 Mm Thk. Concrete Flooring For Plantbox , 50 Mm Thk. Concrete Topping, Bench Footing And Bench, 100 Mm Thk. Concrete Flooring For Landing And Stair Steps With Pebble Topping. •installation Of Formworks And Falseworks For Columns, Bench, Concrete Topping, And Stairs (steps And Landing) •removal Of Formworks And Falseworks Steel Reinforcements And Steel Works •installation Of 12 Mm Ø Dsb For Footings And Columns (bedbars And Vertical Bars) Installation Of 10 Mm Ø Dsb For Column Lateral Ties, Concrete Flooring For Plantbox, Concrete Topping, Bench Footing And Bench, Concrete Flooring For Landing And Stairs •installation Of 50 Mm Ø G.i. Pipe Schd. 40 For Lamp Post •installation Of 50 Mm Ø G.i. Pipe Schd. 40,25 Mm X 25 Mm X 3mm Angle Bar And 50 Mm X 50 Mm Wire Mesh (5mm Thk.) For Railings •installation Of 38 Mm Ø G.i. Pipe Schd. 40 For Bench Fabrication Masonry Works •piling Of 4" Thk. Chb At 800 Mm Height W/ 10mm Ø Dsb For Vertical And Horizontal Bars Sped At 0.60m O.c Bothways For Plantbox Softscape •installation Of Plantboxes With Plants And Frog Grass I. Construction Safety And Health Program (q = 1.00 Lumpsum) Includes Safety Shoes, Safety Helmet, Safety Gloves, Specialized Ppe, First Aide Kit & Medicines. Ii. Project Billboard (q = 2.00 Set/s) Includes 4' X 8' Tarpaulin Print Billboard, 8' X 8' Tarpaulin Print Billboard, 2"x 2"x 8' Coco Lumber, 2"x 3"x 10' Coco Lumber, 2"x 3"x 14' Coco Lumber, Assorted Sizes C.w Nails. Iii. Mobilization & Demobilization (q = 1.00 Lot) Iv. Facilities For The Engineers (q = 1.00 Lot) Includes True-rms Clamp Meter, 400 A Ac/oc, 600v Ac/oc, Cat Iii 600 V Cat Iv 300 V, Fluke 325; Digital Light Meter, Up To 20,000 Lux, Fluke 941; Non-contact Voltage Tester,90 V Ac To 1000 V Ac, Cat V 1000, Fluke 2ac. V. Removal Of Structures And Obstruction (q = 55.56 Cu.m.) Includes Uprooting/cutting Of Trees. Vi. Earthworks (q = 59.82 Cu.m.) Includes Volume To Be Excavated, V = 39.82 Cu.m.;volume To Be Backfilled, V = 39.82 Cu.m.; Gravel Bedding, 1-1/2"ø, V = 20 Cu.m Vi . Steel Reinforcements & Steel Works (q = 9,083.70 Kgs.) Includes 12 Mm Dia. X 6m Dsb; 10 Mm Dia. X 6m Dsb; #16 G.i Tie Wire; 50 Mm Ø G.i. Pipe Schd. 40; 38 Mm Ø G.i. Pipe Schd. 40; 25.4 Mm Ø G.i. Pipe Schd. 40; 5mm Ø Thk. Wire X 50mm X 50mm Mesh Steel Matting; 25 Mm X 25 Mm X 3mm Thk. Angle Bar; Red Lead Metal Primer, Quick Dry Enamel Paint, Paint Brush; Welding Rod (e-6011). Viii. Concrete Works, Formworks And Scaffoldings (q = 47.04 Cu.m.) Includes Portland Cement, Washed Sand, Washed Gravel, 4' X 8' X 1/4" Thk. Marine Plywood, 2" X 2" X 10' Sized Coco Lumber, Assorted Sized C.w Nails. Ix. Masonry Works (q = 194.40 Sq.m.) Includes 4" X 8” X 16" Chb, Portland Cement, Washed Sand, Pebbles. X. Electrical Works (q = 1.00 Lot) Includes Modern-type Outdoor Lamp W/ Post, 2m Height, W/ High-powered 50w Led Bulb, Daylight; Outdoor Bollard Fixture W/ 20w Led Bulb,ip65; Cu Wire,3.5mm2, Thhn/thwn-2, Stranded; Circuit Breaker,15a,2pole,220v,60hz; Circuit Breaker Enclosure, Nema 1,2p; Secondary Rack W/spool Insulator,2-pole,w/screws; Outdoor Junction Box, Ip65 Weather Water Proof, 80x50 Round/octa, W/ Rubber Gasket & Screws; Upvc Conduit Pipe,1/2"x3m; Electrical Tape,0.16x19x16000 Mm; Solvent Cement 200 Cc; Pvc Conduit Fittings And Connectors. Xi.softscape (q = 30.20 Sq.m.) Includes Softscape (includes Garden Soil (planting Medium), Ornamental Plants ,shrubs , Trees). Approved Budget For The Contract (abc): P 3,381,096.77 Required Bid Security: 2% Of The Abc If Cash, Manager’s Check; Bank Draft/guarantee, Irrevocable Letter Of Credit Confirmed Or Authenticated By A Universal Or Commercial Bank; And 5% Of The Abc If Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security Delivery Period Is Within One Hundred Sixty-seven (167) Calendar Days From Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Three (3) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. Interested Bidders May Obtain Further Information From Iligan City Government And Inspect The Bidding Documents During Office Hours From 8:00 A.m. – 12:00 P.m. And 1:00 P.m. – 5:00 P.m. At The Office Of The Bids And Awards Committee, Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule 1. Issuance Of Bid Documents: December 10, 2024 – January 7, 2025 – 8:00 A.m. At Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. 2. Pre-bid Conference: December 17, 2024 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 4. Submission Of Bids: January 7, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 5. Opening Of Bids: January 7, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City A Complete Set Of Bidding Documents Will Be Available To Prospective Bidders Upon Payment Of A Non-refundable Amount Of P 5,000.00 To The Iligan City Government Cashier, At The Bac Office, Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City.the Iligan City Government Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Furthermore, The City Government Of Iligan Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Or Loss Incurred In The Preparation And Submission Of The Eligibility Statements And Bids. Approved By: (signed)darwin J. Manubag, Phd. Bac Chairman Date Of Advertisement/posting: December 10, 2024 Place Of Posting/advertisement: City Hall/ibjt Bulletin Boards, Iligan Official Website, Phil-geps Itb No. 24-149 (ceo-infra)
Closing Soon7 Jan 2025
Tender AmountPHP 3.3 Million (USD 58.5 K)
211-220 of 225 active Tenders