Plywood Tenders

Plywood Tenders

City Of Bais Tender

Civil And Construction...+3Construction Material, Pipe Line Project, Water Storage And Supply
Philippines
Closing Date18 Feb 2025
Tender AmountPHP 345.6 K (USD 5.9 K)
Details: Description Republic Of The Philippines City Of Bais -o0o- Bids And Awards Committee Invitation To Apply For Eligibility And To Bid The City Government Of Bais Invites Interested Bidders To Apply For Eligibility And To Bid For Repair And Maintenance-infrastructure Assets (f) Artesian Wells, Reservoirs, Pumping Station & Conduit, City Engineer’s Office, Viz: Item Approved Budget For The Contract (abc) Pr No. 51-25 Php 345,600.00 1 90 Pcs. 2" X 2" X 12' G. Melina 2 20 Kls. Common Wire Nails # 4" 3 15 Kls. Common Wire Nails # 3" 4 15 Kls. Common Wire Nails # 2" 5 10 Kls. Common Wire Nails # 1" 6 20 Shts. 1/4" X 4 X 8' Mar. Plywood 7 150 Bags Portland Cement 8 50 Cu.m Sand (fine Aggregates) 9 20 Cu.m Gravel (coarse Aggregates 37.5mm) 10 90 Lngth 10mm Ø X 6.0m Def. Bar 11 90 Kls. G.i Tie Wire, No. 16 12 20 Pcs. Hacksaw Blade 13 20 Lngth 1 1/4" Ø X 20' G.i Pipe (s-40) 14 10 Lngth 1/2" Ø X 20' G.i Pipe (s-40) 15 3 Pcs. Foot Valve 1 1/4" Ø 16 5 Pcs. Foot Valve 1" Ø 17 60 Pcs. Tapelon Tape 3/4" Ø 18 20 Pcs. G.i Coupling 1 1/4" Ø 19 20 Pcs. G.i Coupling 1/2" Ø 20 10 Pcs. G.i Tee 1 1/4" Ø 21 4 Pcs. Jetmatic Pump 22 3 Pcs. Cylinder Pump 1 1/4" Ø 23 4 Pcs. Chek Valve 1 1/4" Ø 24 3 Ltrs. Solvent Cement 25 5 Rolls 1/2" Ø X 300m/roll Polyethylene Pipe The Approved Budget For The Contract Is To Be Taken From Gen. Fund 2025. Partial Bids Are Allowed, However, Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. In Order To Qualify, Bidders Should Conform To The Eligibility Criteria As Prescribed Under Sec. 23 And 25 Of The Revised Irr-a Of R.a. 9184. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary "pass/fail" Criteria As Specified In The Revised Irr-a Of R.a. 9184. As Such Non-submission Of Any Of The Required Documents Will Result In The Disqualification Of The Bidder. Due To Covid-19 Pandemic And Quarantine Regulations Of Every Provinces, Presence Of The Bidders Is Not Necessary. The Bids And Awards Committee (bac) Allows The Submission Of Bids Through Electronic Means And Submission Through Courier Services. The Following Documents Are Required For Submission: A. Eligibility Documents Including Technical Documents (1st Envelope): 1. Registration Certificate From Dti For Sole Proprietorship, Sec For Corporation Or Cda For Cooperative. 2. Valid And Current Mayor's Permit Where The Principal Place Of Business Of The Bidder Is Located. 3. Bir Registration Certificate With Taxpayer’s Identification Number. 4. Statement Of The Bidder Of All Its Ongoing And Completed Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid, Within The Relevant Period Where Applicable. The Statement Shall Be Supported With A Copy Of The Contracts/purchase Or Job Orders; And End-users Acceptance Or Delivery Receipt Duly Acknowledged. The Bidder Must Have Completed Within A Period Of Five (5) Years From The Date Of Submission And Receipt Of Bids, A Single Contract That Is Similar To The Contract To Be Bid Whose Value Must Be At Least Fifty (50%) Percent Of The Abc. However, In The Case Of Expendable Supplies, Said Single Contract Must Be At Least Twenty Five (25%) Percent Of The Abc, Or; The Bidder Should Have Completed At Least Two (2) Similar Contracts And The Aggregate Contract Amounts Should Be Equivalent To At Least The Percentage Of The Abc As Required Above. 5. Certificate Of Product Registration (cpr) From Food And Drug Administration (fda). (for Medicine Only)* 6. Certificate Of Good Manufacturing Practice From Fda. (for Medicine Only)* 7. Batch Release Certificate From Fda. (for Medicine Only)* 8. If The Supplier Is Not The Manufacturer, Certification From The Manufacturer That The Supplier Is An Authorized Distributor/dealer Of The Product(s)/item(s). (for Medicine Only)* 9. License To Operate (fda). (for Medicine Or Medical Supplies/equipment)* 10. Certificate Of Accreditation From Bureau Of Local Government Finance (blgf) (for Accountable Forms Only)* 11. Audited Financial Statements, Showing, Among Others, The Bidder's Total And Current Assets And Liabilities, Stamped "received" By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission. 12. The Bidder's Updated Computation For Its Net Financial Contracting Capacity (nfcc) Bearing The Date Thereof Must At Least Be Equal To The Abc To Be Bid, Or A Commitment From A Universal Or Commercial Bank To Extend A Credit Line In Favor Of The Bidder If Awarded The Contract To Be Bid (cl) Must At Least Be Equal To Ten Percent (10%) Of The Abc To Be Bid.* 13. Valid Joint Venture Agreement (jva), In Case Venture Is Already In Existence. 14. All Bids Must Be Accompanied By Bid Security In Any Or Combination Of The Acceptable Forms (below):* Form Of Bid Security Amount Of Bid Security A) Cash, Cashier's/manager's Check, Bank Draft/guarantee Confirmed By A Universal Or Commercial Bank. Two Percent (2%) B) Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank; Provided, However, That It Shall Be Confirmed Or Authenticated By A Commercial Or Universal Bank'; If Issued By A Foreign Bank. C) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security. Five Percent (5%) D) Bid Securing Declaration Prospective Bidder May Also Submit Bid Securities In The Form Of Cashier's/manager's Check, Bank Draft/guarantee, Or Irrevocable Letter Of Credit From Other Banks Certified By The Bsp As Authorized To Issue Financial Statement. Bids And Bid Securities Shall Be Valid For A Reasonable Period As Determined By The Head Of The Procuring Entity, But In No Case Shall Exceed 120 Calendar Days From The Date Of The Opening Of Bids. 15. Production/delivery Schedule.* 16. Manpower Requirements* 17. After-sales Service/parts (if Applicable) 18. Sworn Statement By The Prospective Bidder Or Its Duly Authorized Representative As To The Following: A) It Is Not Blacklisted Or Barred From Bidding By The Gop Or Any Of Its Agencies; Office Corporations, Or Lgu's, Including Foreign Government/foreign Or International Financing Institutions Whose Blacklisting Rules Have Been Recognized By The Gppb; B) Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statement And Information Provided Therein Are True And Correct; C) It Is Authorizing The Head Of Procuring Entity Or The Duly Authorized Representative/s To Verify All Documents Submitted; D) Authority Of The Signatory; E) Affidavit Of Disclosure Of No Relationship; F) Certification On Bidder's Responsibilities; G) It Comply With Existing Labor Laws And Standards, In The Case Of Procurement Of Services; H) It Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Activity, And I) In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. 19. Technical Specifications With Brochures, If Applicable.* 20. Certificate Of Philgeps Registration* 21. Tax Clearance* 22. Latest Income And Business Tax Returns (quarterly/monthly); (optional/required Upon Post-qualification)** Note:*required Documents To Be Submitted By Pre-qualified Suppliers/bidders Per Bac Resolution No. 74-g Dated July 30, 2019. **optional Submission During The Opening Of Bids But Mandatory Requirement Upon Post-qualification Per Bac Resolution No. 58-d Dated August 4, 2020. B. Financial Documents: (2nd Envelope) (a) Bid Prices In The Bill Of Quantities Failure To Submit The Above Requirements On Time Or A Finding Against The Veracity Of Such Shall Be Ground For The Forfeiture Of The Bid Security And Disqualify The Bidder For Award. Performance Security And Warranty Shall Be Governed By The Provisions Of Secs. 39 And 62, Respectively, Of The Revised Irr-a Of R.a. 9184. Bid Documents Can Be Obtained Upon Payment Of Non-refundable Fee Equivalent To The Total Amount Of The Abc Of The Items In Which Interested Bidders Intend To Bid, In Accordance With The Guidelines On The Sale Of Bidding Documents, Appendix 25 Of The Revised Irr Of R.a. 9184: Approved Budget For The Contract (abc) Maximum Cost Of Bidding Documents (in Philippine Peso) 500,000 And Below 500.00 More Than 500,000 Up To 1 Million 1,000.00 More Than 1 Million Up To 5 Million 5,000.00 More Than 5 Million Up To 10 Million 10,000.00 More Than 10 Million Up To 50 Million 25,000.00 More Than 50 Million Up To 500 Million 50,000.00 More Than 500 Million 75,000.00 Bid Documents Can Be Obtained At The Bac Secretariat, Office Of The Bids And Awards Committee, This City, Tel. No. (035) 402-8047, Anytime During Office Hours; And Can Also Be Inquired For Further Information Or Particulars. All Other Particulars Relative To The Procurement Process Shall Be Governed By The Revised Implementing Rules And Regulations Of R.a. 9184 Otherwise Known As The Government Procurement Reform Act. Eligibility Requirements Including Technical Documents And Financial Documents Shall Be Submitted Together Each In Separate Sealed Envelopes Duly Marked As Such On February 18, 2025 At The City Budget Office, 2nd Floor, City Hall Annex Building, This City, At 2:00 Pm At Which Date, Place, And Time Said Envelopes Shall Be Opened In The Presence Of The Members Of The Bac, The Attending Bidders, The Observers, Or Their Duly Authorized Representative. Late And Unsealed Bids Shall Not Be Accepted. The City Government Of Bais Reserves The Right To Accept Or Reject Any Bid, And To Annul The Bidding Process And Reject All Bids At Anytime Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. (sgd.) Mr. Rene C. Llera, Lpt Sao /oic-cbo Chair, Bids And Awards Committee

City Of Valencia Tender

Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Philippines
Closing Date6 Jan 2025
Tender AmountPHP 4.7 Million (USD 82.2 K)
Details: Description Local Government Of Valencia Catarata Street, Poblacion, Valencia City, Bukidnon, Philippines Philippine Access (088) 828-5430 Contract Reference No. 48-2024 12/14/2024 Invitation To Bid For The Construction Of Canopy And Other Structures, City Health Office At Barangay Poblacion, Valencia City, Bukidnon 1. The City Government Of Valencia Through Its Annual Appropriations Intends To Apply The Sum Of Four Million Seven Hundred Seventy-three Thousand Two Hundred Four Pesos And 84/100 (php 4,773,204.84) Being The Approved Budget Of The Contract (abc) To Payments Under The Contract For The Construction Of Canopy And Other Structures, City Health Office At Barangay Poblacion, Valencia City, Bukidnon. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The City Government Of Valencia Now Invites Bids For The Construction Of Canopy And Other Structures, City Health Office At Barangay Poblacion, Valencia City, Bukidnon. Particulars Describes As Follows: Item No. Qty Unit Description Specifications Unit Cost Total Cost 1 1 Lot Construction Of Canopy And Other Structures, City Health Office Php4,773,204.84 ● Construction Of Walkway Canopy ● Renovation Of Porte Cochery Roof ● Construction Of Waiting Area With Drinking Fountain And Handwashing Area ● Fabrication And Installation Of Mrf ● Construction Of Perimeter Fence ● Removal And Replacement Of Tb Dots Polycarbonate Roof Sheets ● Removal And Replacement Of Concrete Pavement Leading To Tb Dots ● Construction Of Parking Area And Outdoor Kitchen Scope Of Works: A.) Application Of Permits And Clearances, B.) Fabrication And Installation Of Project Billboard And Signboard, C.) Occupational Safety And Health Program, D.) Project Mobilization And Demobilization, G.) Demolition Of Kitchen, Pavement To Tb Dots And Porte Cochery Roof; Structure Excavation For Concrete Structures Such As Footings And Wall Footingh.) Gravel Fill For Footings, Wall Footing And Floors, I.) Construction Of Reinforced Concrete Structures Such As Footing, Pedestals, Wall Footing, Lavatory, Canal And Floors, J.) Fabrication And Installation Of Formworks And Falseworks, K.) Embankment From Structure Excavation, L.) Fabrication And Installation Of Steel Structures Roof Framings Such As Rafter, Girt, Anchor Bolt, Baseplate, Fascia Frame, Purlins, M.) Installation Of Pre-painted Metal Sheets And Fabricated Metal Accessories Such As Flashings And Gutter, Polycarbonate Roof, Acp, Pvc Ceiling, O.) Installation Of Metal Frames And Fiber Board On Fascia Board (fiber Cement Board), P.) Painting Works On All Steel And Concrete Structures, Q.)installation Of Plumbing Fixtures, Gratings, Barb Wire, Plumbing Works (including Handwashing Sink And Drinking Fountain), Storm Drainage And Downspout, R.) Installation Of Electrical Works, S.) Purchase & Installation Of Industrial Fan, Complete As Per Approved Pow, Plans, And Specifications. Part I General Requirements B.3 (1) 1.00 L.s. Permits And Clearances B.5 (1) 1.00 Ea. Project Billboard / Signboard B.7 (1) 1.00 L.s. Occupational Safety And Health Program B.9 (1) 1.00 L.s. Mobilization / Demobilization Part Ii Civil, Mechanical, Electrical And Sanitary/plumbing Works See Attached Plan And Specifications Part A Earthwork 801 (1) 1.00 L.s. Removal Of Structures And Obstruction 803 (1) A 168.74 Cu.m. Structure Excavation (common Soil) 804 (1) A 53.44 Cu.m. Embankment From Structure Excavation(common Soil) 804 (7) 31.66 Cu.m. Gravel Fill Part B Plain And Reinforced Concrete Work 900 (1) C 49.17 Cu.m. Structural Concrete (3000psi, Class A, 28 Days) 902 (1) A1 3,212.35 Kg. Reinforcing Steel (deformed, Grade 40) 903 (2) 101.12 Sq.m. Formworks And Falseworks Part C Finishings And Other Civil Works C.2 Masonry Works 1046 (2) A1 209.24 Sq.m. Chb Non Load Bearing (including Reinforcing Steel, 100mm) C.3 Fabricated Materials 1007 (1) B 5.25 Sq.m. Aluminum Framed Glass Door (swing Type) 1008 (1) A 44.52 Sq.m. Aluminum Glass Windows (sliding Type) 1008 (1) C 10.40 Sq.m. Aluminum Glass Windows (awning Type) 1008 (1) D 5.19 Sq.m. Aluminum Glass Windows (fixed Type) C.4 Finishing Works 1003(1)a1 147.40 Sq.m. Ceiling (6mm Marine Plywood On Metal Frame) 1003(1)a2 17.98 Sq.m. Ceiling (pvc Panel Board On Metal Frame) 1003(2)1 1.00 L.s. Parapet Wall (aluminum Composite Panel On Aluminum Frame) 1003 (11) A1 39.90 M. Fascia Board (fiber Cement Board) 1018 (1) 172.91 Sq.m. Glazed Tiles And Trims 1027 (1) 316.44 Sq.m. Cement Plaster Finish C.5 Painting Works 1032 (1) A 525.04 Sq.m. Painting Works (masonry) 1032 (1) C 572.85 Sq.m. Painting Works (steel) C.6 Roof Framing And Roofing Works 1013 (2) A2 50.10 L.m. Fabricated Metal Roofing Accessory (gauge 26) - Flashings 1013 (2) B1 25.00 L.m. Fabricated Metal Roofing Accessory (gauge 24) - Gutters 1014 (1) B2 548.64 Sq.m. Prepainted Metal Sheets (rib Type, Long Span, Above 0.427 Mm) See Attached Plan And Specifications 1036(1) A 70.56 Sq.m. Polycarbonate (sheets) 1047 (1) 6,302.64 Kgs Structural Steel 1047 (2) B 2,348.63 Kg. Structural Steel (purlins) 1047 (3) C 28.00 Ea. Metal Structure Accessories (turnbuckle) - 12mm Ø 1047 (4) 157.35 Kg. Metal Structure Accessories (cross Bracing) 1047 (6) 356.77 Kg. Metal Structure Accessories (steel Plates) 1047 (7) A 96.36 Kg. Metal Structure Accessories (bolts) 1047 (7) B 16.19 Kg. Metal Structure Accessories (sagrods) - 10mmø 503(1) 17.00 Sets Metal Frames And Grating C.7 Plumbing Works 1001 (5) B 4.00 Ea. Catch Basin (chb) 1001 (8) 1.00 L.s. Sewer Line Works 1002 (4) 1.00 L.s. Plumbing Fixtures (including Drinking Fountain And Handwashing Area) 1002 (24) 1.00 L.s. Cold Water Lines Part D Electrical Works 1100 1.00 L.s Conduits, Boxes And Fittings (conduit Works/conduit Rough-in) 1200 (3) 1.00 L.s Stand Fan, Industrial Type 1101 (33) 1.00 L.s. Wires And Wiring Devices 1102 (1) 1.00 L.s. Panelboard With Main & Branch Breakers 1103 (1) 1.00 L.s. Lighting Fixture And Lamps Php4,773,204.84 Required Number Of Days For Completion Is 195 Calendar Days. Bidders Should Have Completed A Contract Similar To The Project Within 10 Years From The Date Of Submission And Receipt Of The Bid Hereof. The Description Of An "eligible Bidder" Is Contained In The Bidding Documents, Particularly In Section Ii. Instructions To Bidders. 3. No Time Extension Shall Be Granted Unless On Fortuitous Event, Acts Of Nature Or Any Natural Calamities. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary "pass/fail" Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act". Bidding Is Restricted To Filipino Citizens, Sole Proprietorship, Partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. 5. Interested Bidders May Obtain Further Information From Josafat L. Caipang, Head Of Lgu-valencia City Bac Secretariat And Inspect The Bidding Documents At Address Given Below From Mondays-fridays 8:00 Am To 5:00 Pm. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders On December 15, 2024 To Opening Date From The Address Below And Upon Payment Of Non-refundable Fee For The Bidding Documents In The Amount Five Thousand Pesos (php 5,000.00). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) Provided That The Bidders Shall Pay The Non-refundable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. Site Inspection Is Required From Every Interested Bidder And Site Inspection Certificate Shall Form Part Of The Bid Documents. No Site Inspection Certificate Shall Mean Automatic Disqualification. Site Inspection Schedule Is On December 20, 2024 At 10:00 O’clock In The Morning, Assembly Area At Bac Office. 6. The City Government Of Valencia Will Hold Its Pre-bid Conference On December 23, 2024 (1:30 Pm) At The Bac Office, City Hall Compound, City Of Valencia, Bukidnon Which Shall Be Open To All Interested Bidders. 7. Only Project Engineers, Materials Engineer And The Like Are Required To Attend The Pre-bid Conference. In The Absence Of The Same, The Representative Must Present To The Bac An Authorization Letter Signed By The Owner. 8. Interested Contractor Are Required To Include In Their Technical Bid Proposal The Duly Signed List Of Contractor's Equipment Units, Which Are Owned, Leased And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project. 9. Prospective Bidders Who Were Not Able To Purchase Bid Documents Prior To The Bid Opening Shall Not Be Opened And Will Be Disqualified. 10. Bids Must Be Delivered To The Address Below On Or Before (1:00 Pm) January 6, 2025. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms In The Amount Stated In Itb Clause 18. Bids Will Be Opened In The Presence Of The Bidders’ Representative Who Chooses To Attend At The Address Below. Bid Opening Shall Be On (1:30 Pm) January 6, 2025 At Bac Office, City Hall Compound, City Of Valencia, Bukidnon. Late Bids Shall Not Be Accepted. The Clock In The Bac Office Shall Serve As The Time Reference, And Shall Be The Basis For The Official Time Received Of The Bidding Documents Submitted In The Office. 11. The City Government Of Valencia Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expenses Incurred In The Preparation Of The Bid. 12. The Head Of The Procuring Entity (hope) Reserves The Right To Accept Or Reject Any Or All Bids To Annul The Bidding Process, At Any Time Prior To Contract Award Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 13. All Correspondence Shall Be Addressed To The Bac Secretariat, Attention: Mr. Abe P. Gillaco, Mpa, Bac Chairman. 14. For Further Information, Please Refer To: Lgu Valencia City-josafat L. Caipang Admin Office, 8709 Catarata St., Poblacion, Valencia City, Bukidnon Tel. No. (088) 828-5430 Abe P. Gillaco, Mpa Bac Chairman

Barangay Sta Elena, Tanauan, Leyte Tender

Civil And Construction...+3Civil Works Others, Building Construction, Construction Material
Philippines
Closing Date11 Feb 2025
Tender AmountPHP 150 K (USD 2.5 K)
Details: Description Description I. Removal Of Existing Concrete Flooring Ii. Structure Excavation (common Soil) Iii. Structural Concrete For Footing Iv. Reinforcing Steel Of Reinforced Concrete Structures V. 6mm Marine Plywood On Metal Frame Ceiling Vi. Glazed Tiles And Trims Vii. Cement Plaster Finish Viii. Painting Works (masonry Painting) Ix. Painting Works (wood Painting) X. Painting Works (metal Painting) Xi. Cement Plaster Finish Xii. 100mm Chb Non Load Bearing (including Reinforcing Steel) Xiii. Metal Structure Accessories 1. Barangay Sta. Elena, Tanauan, Leyte Through The Bids And Awards Comm.) Invites Suppliers, Distributors Of Construction Materials For The Project: Improvement Of Multi-purpose Hall 2. The Bids And Awards Committee Will Use A Non-discretionary Pass/fail Criterion In The Eligibility Check/screening As Well As The Preliminary Examination Of Bids. 3. The Following Eligibility Documents In Two (2) Copies Duly Certified Must Be Submitted To The Bids And Awards Committee (bac) Not Later Than February 11, 2025: A.) Letter Of Intent; B.) Business License Permit/valid And Current Mayor’s Permit/municipal License; C.) Dti Business Name Registration Or Sec Registration Certificate; D.) Latest Audited Financial Statement; E.) Company Profile; F.) Tax Identification No. (tin); G.) Sworn Statement By The Prospective Bidder That He Is Not “barred” Or “blacklisted” From Participating In The Government Biddings, Including Non-inclusion In The Consolidated Blacklisting Report Issued By Gppb; H.) Other Appropriate License As Maybe Required By The Procuring Entity; I.) Statement Of Prospective Bidder Of All Its Ongoing And Completed Government And Private Contracts Within The Period Specified In The Iaeb, Including Contracts Awarded But Not Yet Started; J.) Articles Of Incorporation, Partnership Or Cooperation, Whichever Is Applicable, Including Amendments Thereto, If Any; K.) Sworn Affidavit Of The Bidder That Is Not Related To The Head Of The Procuring Entity, Members Of The Bac, Twg And Secretariat And The Members Of The Pmo And The Designers Of The Project, By Consanguinity Or Affinity Up To The Third Civil Degree; L.) Valid Joint Venture Agreement In Case Of Joint Venture; M.) Letter Authorizing The Bac Or Its Duly Authorized Representative/s To Verify Any Or All Of The Documents Submitted For Eligibility Check; Certification Under Oath That Each Of The Documents Submitted In Satisfaction Of Eligibility Requirements Is An Authentic And Original Copy, Or A True And Faithful Reproduction Of The Original Complete And That All Statements And Information Provided Therein Are True And Correct; N.) Other Appropriate Licenses As May Be Required By The Procuring Entity Concerned; O.) Copies Of End-user’s Acceptance Letter For Completed Contracts; P.) Specification Of Whether Or Not Prospective Bidder Is A Manufacturer Supplier Or Distributor; Q.) Audited Financial Statement “received” By The Ir Or Its Duly Accredited And Authorized Institutions, For Immediately Preceding Calendar Year, Showing Among Others The Total Assets And Liabilities; R.) Computation Of Net Financial Contracting Capacity (nfcc) Or S.) Certificate Of Commitment Specific To The Contract At Hand, Issued By A Licensed Bank To Extend To The Bidder A Credit Line If Awarded The Contract Or; T.) A Cash Deposit Certified Certifying A Hold Out On Cash Deposits Issued By A Licensed Bank Which Shall Also Be Specific To The Contract To Be Bid, In An Amount Not Lower That The Set By The Procuring Entity In The Bidding Documents, Which Shall Be At Least Equal To 10% Of The Approved Budget For Contract. 4. Sealed Two (2) Envelope System Will Be Received By The Bac At The Barangay Hall Not Later Than 2:00 Pm On February 11, 2025. 5. Barangay Sta. Elena, Tanauan, Leyte Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Incurred In The Preparation Of Their Bids. 6. Barangay Sta. Elena, Tanauan, Leyte Reserves The Right To Reject Or All Bids To Waive Any Defect And Informally Therein. Hon. Nicolas V. Arcena Brgy. Chairman Instructions To Bidders 1.1 Only Firms/entities Duly Qualified Eligibility Requirements By The Bids And Awards Committee(bac) To Participate In The Bidding May Submit Proposals. 1.2 Bids /tenders Shall Be Considered Only From Bidders Who Have Visited The Site And Who Have Secured Bid Documents With The Equipment Specification At The Bac Secretary, 1.3 All Bids/tenders Shall Be Prepared In English And Submitted To Bac Secretary; 1.4 The Bidder Shall Prepare His Bid By Accomplishing And Submitting Three (3) Copies Of The Bid/tender Documents(e.i.prescribed Forms)including The Required Enclosed Attachments.all Blank Space Must Be Properly Filled Out By The Typewriter Except Where Specifically Otherwise Stated. 1.5 If Erasures Or Changes Are Made ,each Erasures Or Changes Must Initiated By The Person Signing The Bid/tender. 1.6 Bid/tenders Will Be Submitted For Any Items.bids/tenders Must Be For All Items In The Bill Of Quantities Of Any Items .bid/tenders Shall Be Written In Words As Well As In Figures,the Price In Words Shall Prevail. In Case Of Discrepancy In The Unit Price And The Extension Thereof,the Unit Price Shall Govern. 1.7 All Pages In Bid Tender Documents ,including Annexes Shall Be Signed In Ink .the Bid/tender Must Signed By The Bidder Himself Or Duly Authorized Person Or Persons. 1.8 The Bid/tender Shall Contain All The Information And Data Required To Be Furnished By The Bidder/tender. 1.9 The Bidder Required To Make A Careful Examination And Contemplated In The Bid Documents ,specifications,special Provisions If Any ,and The Form Of Contract,and Fully Informs Himself As To Quality Of Materials.the Submission Of Bids By Any Bidder Shall Be Deemed That He Has Made Such Examination And Is Satisfied As To The Condition To Be Encountered In Performing The Work Contemplated And Has Familiarized Him With All The Requirements Governing Or Affecting Him And His Operations. 1.10 The Barangay Assumes No Obligations Whatsoever To Compensate Or Indemnify The Bidders /tenderscfor Any Expense Or Loss That May Occur In The Preparation Of Their Proposals,nor Does The Barangay Guarantee That An Award Will Be Made Under The Contract Documents. Bid Security 1.11 All Bids Shall Be Accomplished By The Bid Security Least Equal To,and Not Lower Than One Percent(1%)as Approved Budget For The Contract To Be Bid In The Form Of Cash,certified Check,cashiers Check,managers Check,bank Draft Or Irrevocable Letter Of Credit ,one And One Half Percent(1 ½%) In The Form Of Bank Guarantee, Two And One Half Percent (2 ½%)in The Form Of Surety Bond Callable Upon Demand Issued By A Reputable Surety Or Insurance Company Payable To Barangay Sta. Elena, Tanauan, Leyte As A Guarantee That The Successful Bidder Within Ten Calendar Days(10) Or Less From Receipt Of Notice Of Award ,enter Into Contract With The Barangay And F6rnish The Performance Bond.bid Securities Shall Be Valid For A Reasonable Period As Indicated Which Shall Not Be Less Than One Hundred Twenty (120) Calendar Days Following The Opening Of Bids. 1.12 No Bid Securities Shall Be Returned To Bidders After The Opening Of Bids And Before Contract Signing ,except Of Those That Failed To Comply With Any Of The Requirement Tone Be Submitted In The First Bid Envelop Of The Bid. 1.13 Failure To Enclose The Required Bid Security In The Form And Amount Prescribed Herein Shall Automatically Disqualify The Bid Concerned . Submission And Receipt Of Bids 1.14 Bid/proposals In The Prescribed Form ,shall Be Submitted In Two (2) Sealed Envelop Properly Marked In Capital Letters The Name/title Of The Project To Be Bid And The Name Of The Bidders ,and Must Be Addressed To; The Bac Chairman,bids And Awards Committee(bac)and Or,type Bac Chairman, Barangay Sta. Elena Tanauan, Leyte .the Bidders Shall Marked The Two Envelopes;do Not Open(date And Time Of Opening Of Bids). 1.15 The First Envelope Which Should Be Marked “1st”shall Contain The Following;1.bid Security As To Form Amount And Validity Period ;2.authority Of The Signatory ;3.production /delivery Schedule ;4.manpower Requirements;5.after Sales Service/parts;if Applicable;6.technical Specifications;7. Commitment From The Suppliers/distributors/manufacturer’s Bank To Extend To Him A Credit Line If Awarded The Contract To Be Bid Or Cash Deposit Equivalent To Ten Percent (10%) Of The Abc (p149,974.31);8.duly Signed Certificate In Compliance With The Disclosure Provision Under Section 47 Of The Act In Relation To Other Provisions Og Ra3019 ;duly Signed Statement Attesting To Have Complied With Responsibilities Listed In Gpra Irr-aand Other Documents /materials As Stated In The Instruction To Bidders. 1.16 The Second Envelope,which Should Be Marked’’2nd ‘’shall Contain The Following;1.the Bid Prices In The Bill Of Quantities In The Prescribed Bid Form;2.the Recurring And The Maintenance Costs, If Applicable. Withdrawal Of Bids 1.17 A Bidder May Modify Its Bid Before Deadline For The Submission And Receipt Of Bids Not Allowed To Retrieve Its Original Bid ,but Shall Send Another Bid Equally Sealed,properly Identified And Marked As A Modification And Stamped Received By Bac. 1.18 A Bidder Will Be Allowed To Withdraw His Bid Prior To The Time Set For Its Opening Provided He Communicated His Purpose In Writing To The Bac;in This Case The Bid/tender Shall Return To Him Un Opened .no Bid Can Be Withdrawn For Any Reason Whatsoever After Opening Of Bids Has Commenced. 1.19 The Bidder Shall Be Responsible For Having Taken Steps To Carefully Examine All The Contract Documents ,have Fully Informed Himself With All Conditions, Local Or Otherwise ,relative To The Carrying Out Of The Contract Work; 1.20 The Barangay Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Or Conclusions Obtained By The Bidder Out Of The Data Furnished By The Barangay Or Its Consultant,either Before Or Conditions Contained In The Contract. Laws, Ordinances , Rules And Regulations 1.21 In Submitting A Proposal/bid ,the Bidder Is Considered To Have Familiarized Himself,acts,rules And Regulations Of The Republic Of The Philippines,including Any Or All Local Ordinances Or Rules Or Regulations,which In Any Manner May Affect Or Apply To The Operation And Activities Of The Bidders.the Bidder Shall Be The Employer Of The Personnel Whom He Will Engage The Prosecution Of The Contract And Is Under Obligation To Comply With The Labor Laws Of The Philippines. 1.22 In Addition , The Bidder Is Advised To Carefully Examine And To Inform And To Familiarized Himself With All The Ordinances ,rules,and Regulations Adopted By The Barangay In Regards With The Procurement Of Goods. Bidders Competence 1.23 The Barangay Reserves The Right To Fully Examine The Competence And Responsibility Of The Bidder At Any Time Before Award Of Contract By Aby Means And To Reject Any Bid/tender When Statement As To Business And Technical Organizations Or Financial Resources Or Construction Performance Have Been Found To Be False /and Or Fabricated And In The Barangay”s Opinion Would Justify Rejection. Pre Bid Conference 1.24 No Pre Bid Conference Will Be Conducted Except Upon Written Request Of Any Prospective Bidder Which Shall Be Held Within A Reasonable Period Before Prospective To Adequately Prepare The Bids Subject To The Approval Of The Bac. 1.25 Bids Will Be Opened On February 11, 2025 At Exactly 02:00 Pm At The Barangay Hall. Bidders Or Authorized Representative May Attend The Opening Of Bids. 1.26 Immediately After Opening Of Bids The Bac Of The Brgy. Will Undertake A Thorough Study And Bid Evaluation Of Proposed Submitted.award Of The Contract Shall Be Made To The Bidder With The Lowest Calculated Responsive Bid. 1.27 The Brgy. Reserves The Right To Reject Any Or All Bids /tenders ,to Waive Informality In The Bid/tender Received .the Right Is Also Reserve To Reject The Bid/tender Of Any Bidder Who (a)have Previously Failed To Satisfactorily Perform Or Complete Any Construction Contract Undertaken By Him. (b)was Qualified In The Eligibility Requirement On The Basis Of Suppressed Or False Information;or (c) Such Other Compelling Grounds As Determinedcduring Bid Evaluation Of The Proposal Of Bids; 1.28 Within A Period Not Exceeding Fifteen (15) Calendar Days From The Declaration By The Bac Of The Lowest Calculated Responsive Bid Or Highest Rated Responsive Bid And Immediately After Approval Of The Recommendation Of The Bac By Thr Local Chief Executive Of His Duly Authorized Representative Shall Issue The Notice Of Award To The Winning Bidder. Created By; Hon. Nicolas V. Arcena Brgy. Chairman

BARANGAY BANTAGAN, TANAUAN, LEYTE Tender

Civil And Construction...+2Building Construction, Construction Material
Philippines
Closing Date22 Jan 2025
Tender AmountPHP 800 K (USD 13.6 K)
Details: Description I. Structural Concrete For Column And Beam Ii. Removal Of Structures And Obstruction Iii. Reinforcing Steel Of Reinforced Concrete Structures Iv. Formworks And Falseworks V. Carpentry And Joinery Works Vi. 6mm Marine Plywood On Metal Frame Ceiling Vii. Aluminum Glass Window (sliding Type) Viii. Wooden Panel Door Ix. Pre-painted Metal Sheets X. Glazed Tiles And Trims Xi. Cement Plaster Finish Xii. Painting Works (masonry Painting) Xiii. Painting Works (wood Painting) Xiv. Painting Works (metal Painting) Xv. 100mm Chb Non Load/load Bearing (including Reinforcing Steel) Xvi. Structural Steel Roof Framing And Truss Xvii. Structural Steel Purlins Xviii. Metal Structure Accessories (railings) Xix. Electrical Works 1. Barangay Bantagan, Tanauan, Leyte Through The Bids And Awards Comm.) Invites Suppliers, Contractors, & Distributors Of Construction Materials For The Project: Construction/improvement Of Sk Hall 2. The Bids And Awards Committee Will Use A Non-discretionary Pass/fail Criterion In The Eligibility Check/screening As Well As The Preliminary Examination Of Bids. 3. The Following Eligibility Documents In Two (2) Copies Duly Certified Must Be Submitted To The Bids And Awards Committee (bac) Not Later Than January 22, 2025: A.) Letter Of Intent; B.) Business License Permit/valid And Current Mayor’s Permit/municipal License; C.) Dti Business Name Registration Or Sec Registration Certificate; D.) Latest Audited Financial Statement; E.) Company Profile; F.) Tax Identification No. (tin); G.) Sworn Statement By The Prospective Bidder That He Is Not “barred” Or “blacklisted” From Participating In The Government Biddings, Including Non-inclusion In The Consolidated Blacklisting Report Issued By Gppb; H.) Other Appropriate License As Maybe Required By The Procuring Entity; I.) Statement Of Prospective Bidder Of All Its Ongoing And Completed Government And Private Contracts Within The Period Specified In The Iaeb, Including Contracts Awarded But Not Yet Started; J.) Articles Of Incorporation, Partnership Or Cooperation, Whichever Is Applicable, Including Amendments Thereto, If Any; K.) Sworn Affidavit Of The Bidder That Is Not Related To The Head Of The Procuring Entity, Members Of The Bac, Twg And Secretariat And The Members Of The Pmo And The Designers Of The Project, By Consanguinity Or Affinity Up To The Third Civil Degree; L.) Valid Joint Venture Agreement In Case Of Joint Venture; M.) Letter Authorizing The Bac Or Its Duly Authorized Representative/s To Verify Any Or All Of The Documents Submitted For Eligibility Check; Certification Under Oath That Each Of The Documents Submitted In Satisfaction Of Eligibility Requirements Is An Authentic And Original Copy, Or A True And Faithful Reproduction Of The Original Complete And That All Statements And Information Provided Therein Are True And Correct; N.) Other Appropriate Licenses As May Be Required By The Procuring Entity Concerned; O.) Copies Of End-user’s Acceptance Letter For Completed Contracts; P.) Specification Of Whether Or Not Prospective Bidder Is A Manufacturer Supplier Or Distributor; Q.) Audited Financial Statement “received” By The Ir Or Its Duly Accredited And Authorized Institutions, For Immediately Preceding Calendar Year, Showing Among Others The Total Assets And Liabilities; R.) Computation Of Net Financial Contracting Capacity (nfcc) Or S.) Certificate Of Commitment Specific To The Contract At Hand, Issued By A Licensed Bank To Extend To The Bidder A Credit Line If Awarded The Contract Or; T.) A Cash Deposit Certified Certifying A Hold Out On Cash Deposits Issued By A Licensed Bank Which Shall Also Be Specific To The Contract To Be Bid, In An Amount Not Lower That The Set By The Procuring Entity In The Bidding Documents, Which Shall Be At Least Equal To 10% Of The Approved Budget For Contract. 4. Sealed Two (2) Envelope System Will Be Received By The Bac At The Barangay Hall Not Later Than 2:00 Pm On January 22, 2025. 5. Barangay Bantagan, Tanauan, Leyte Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Incurred In The Preparation Of Their Bids. 6. Barangay Bantagan, Tanauan, Leyte Reserves The Right To Reject Or All Bids To Waive Any Defect And Informally Therein. Hon. Jerom T. Yepes Barangay Sk Chairman Instructions To Bidders 1.1 Only Firms/entities Duly Qualified Eligibility Requirements By The Bids And Awards Committee(bac) To Participate In The Bidding May Submit Proposals. 1.2 Bids /tenders Shall Be Considered Only From Bidders Who Have Visited The Site And Who Have Secured Bid Documents With The Equipment Specification At The Bac Secretary, 1.3 All Bids/tenders Shall Be Prepared In English And Submitted To Bac Secretary; 1.4 The Bidder Shall Prepare His Bid By Accomplishing And Submitting Three (3) Copies Of The Bid/tender Documents(e.i. Prescribed Forms)including The Required Enclosed Attachments. All Blank Space Must Be Properly Filled Out By The Typewriter Except Where Specifically Otherwise Stated. 1.5 If Erasures Or Changes Are Made ,each Erasures Or Changes Must Initiated By The Person Signing The Bid/tender. 1.6 Bid/tenders Will Be Submitted For Any Items. Bids/tenders Must Be For All Items In The Bill Of Quantities Of Any Items. Bid/tenders Shall Be Written In Words As Well As In Figures, The Price In Words Shall Prevail. In Case Of Discrepancy In The Unit Price And The Extension Thereof, The Unit Price Shall Govern. 1.7 All Pages In Bid Tender Documents, Including Annexes Shall Be Signed In Ink. The Bid/tender Must Signed By The Bidder Himself Or Duly Authorized Person Or Persons. 1.8 The Bid/tender Shall Contain All The Information And Data Required To Be Furnished By The Bidder/tender. 1.9 The Bidder Required To Make A Careful Examination And Contemplated In The Bid Documents, Specifications, Special Provisions If Any, And The Form Of Contract, And Fully Informs Himself As To Quality Of Materials. The Submission Of Bids By Any Bidder Shall Be Deemed That He Has Made Such Examination And Is Satisfied As To The Condition To Be Encountered In Performing The Work Contemplated And Has Familiarized Him With All The Requirements Governing Or Affecting Him And His Operations. 1.10 The Barangay Assumes No Obligations Whatsoever To Compensate Or Indemnify The Bidders /tenders For Any Expense Or Loss That May Occur In The Preparation Of Their Proposals, Nor Does The Barangay Guarantee That An Award Will Be Made Under The Contract Documents. Bid Security 1.11 All Bids Shall Be Accomplished By The Bid Security Least Equal To, And Not Lower Than One Percent(1%)as Approved Budget For The Contract To Be Bid In The Form Of Cash, Certified Check, Cashier’s Check ,managers Check, Bank Draft Or Irrevocable Letter Of Credit ,one And One Half Percent(1 ½%) In The Form Of Bank Guarantee, Two And One Half Percent (2 ½%)in The Form Of Surety Bond Callable Upon Demand Issued By A Reputable Surety Or Insurance Company Payable To Barangay Bantagan, Tanauan, Leyte As A Guarantee That The Successful Bidder Within Ten Calendar Days(10) Or Less From Receipt Of Notice Of Award ,enter Into Contract With The Barangay And F6rnish The Performance Bond. Bid Securities Shall Be Valid For A Reasonable Period As Indicated Which Shall Not Be Less Than One Hundred Twenty (120) Calendar Days Following The Opening Of Bids. 1.12 No Bid Securities Shall Be Returned To Bidders After The Opening Of Bids And Before Contract Signing, Except Of Those That Failed To Comply With Any Of The Requirement Tone Be Submitted In The First Bid Envelop Of The Bid. 1.13 Failure To Enclose The Required Bid Security In The Form And Amount Prescribed Herein Shall Automatically Disqualify The Bid Concerned. Submission And Receipt Of Bids 1.14 Bid/proposals In The Prescribed Form, Shall Be Submitted In Two (2) Sealed Envelope Properly Marked In Capital Letters The Name/title Of The Project To Be Bid And The Name Of The Bidders, And Must Be Addressed To; The Bac Chairman, Bids And Awards Committee(bac) And Or, Type Bac Chairman, Barangay Bantagan, Tanauan, Leyte. The Bidders Shall Mark The Two Envelopes; Do Not Open (date And Time Of Opening Of Bids). 1.15 The First Envelope Which Should Be Marked “1st” Shall Contain The Following; 1.bid Security As To Form Amount And Validity Period ;2.authority Of The Signatory ;3.production /delivery Schedule; 4.manpower Requirements;5.after Sales Service/parts; If Applicable;6.technical Specifications;7. Commitment From The Suppliers/distributors/manufacturer’s Bank To Extend To Him A Credit Line If Awarded The Contract To Be Bid Or Cash Deposit Equivalent To Ten Percent (10%) Of The Abc (p800,000.00);8.duly Signed Certificate In Compliance With The Disclosure Provision Under Section 47 Of The Act In Relation To Other Provisions Of Ra3019 ;duly Signed Statement Attesting To Have Complied With Responsibilities Listed In Gpra Irr-a And Other Documents /materials As Stated In The Instruction To Bidders. 1.16 The Second Envelope, Which Should Be Marked “2nd” Shall Contain The Following; 1.the Bid Prices In The Bill Of Quantities In The Prescribed Bid Form; 2.the Recurring And The Maintenance Costs, If Applicable. Withdrawal Of Bids 1.17 A Bidder May Modify Its Bid Before Deadline For The Submission And Receipt Of Bids Not Allowed To Retrieve Its Original Bid, But Shall Send Another Bid Equally Sealed, Properly Identified And Marked As A Modification And Stamped Received By Bac. 1.18 A Bidder Will Be Allowed To Withdraw His Bid Prior To The Time Set For Its Opening Provided He Communicated His Purpose In Writing To The Bac; In This Case The Bid/tender Shall Return To Him Un Opened .no Bid Can Be Withdrawn For Any Reason Whatsoever After Opening Of Bids Has Commenced. 1.19 The Bidder Shall Be Responsible For Having Taken Steps To Carefully Examine All The Contract Documents ,have Fully Informed Himself With All Conditions, Local Or Otherwise ,relative To The Carrying Out Of The Contract Work; 1.20 The Barangay Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Or Conclusions Obtained By The Bidder Out Of The Data Furnished By The Barangay Or Its Consultant, Either Before Or Conditions Contained In The Contract. Laws, Ordinances , Rules And Regulations 1.21 In Submitting A Proposal/bid ,the Bidder Is Considered To Have Familiarized Himself, Acts, Rules And Regulations Of The Republic Of The Philippines, Including Any Or All Local Ordinances Or Rules Or Regulations, Which In Any Manner May Affect Or Apply To The Operation And Activities Of The Bidders. The Bidder Shall Be The Employer Of The Personnel Whom He Will Engage The Prosecution Of The Contract And Is Under Obligation To Comply With The Labor Laws Of The Philippines. 1.22 In Addition , The Bidder Is Advised To Carefully Examine And To Inform And To Familiarized Himself With All The Ordinances ,rules, And Regulations Adopted By The Barangay In Regards With The Procurement Of Goods. Bidders Competence 1.23 The Barangay Reserves The Right To Fully Examine The Competence And Responsibility Of The Bidder At Any Time Before Award Of Contract By Aby Means And To Reject Any Bid/tender When Statement As To Business And Technical Organizations Or Financial Resources Or Construction Performance Have Been Found To Be False /and Or Fabricated And In The Barangay’s Opinion Would Justify Rejection. Pre Bid Conference 1.24 No Pre Bid Conference Will Be Conducted Except Upon Written Request Of Any Prospective Bidder Which Shall Be Held Within A Reasonable Period Before Prospective To Adequately Prepare The Bids Subject To The Approval Of The Bac. 1.25 Bids Will Be Opened On January 22, 2025 At Exactly 2:00 Pm At The Barangay Hall. Bidders Or Authorized Representative May Attend The Opening Of Bids. 1.26 Immediately After Opening Of Bids The Bac Of The Barangay Will Undertake A Thorough Study And Bid Evaluation Of Proposed Submitted. Award Of The Contract Shall Be Made To The Bidder With The Lowest Calculated Responsive Bid. 1.27 The Barangay Reserves The Right To Reject Any Or All Bids /tenders ,to Waive Informality In The Bid/tender Received .the Right Is Also Reserve To Reject The Bid/tender Of Any Bidder Who (a)have Previously Failed To Satisfactorily Perform Or Complete Any Construction Contract Undertaken By Him. (b)was Qualified In The Eligibility Requirement On The Basis Of Suppressed Or False Information; Or (c) Such Other Compelling Grounds As Determined During Bid Evaluation Of The Proposal Of Bids; 1.28 Within A Period Not Exceeding Fifteen (15) Calendar Days From The Declaration By The Bac Of The Lowest Calculated Responsive Bid Or Highest Rated Responsive Bid And Immediately After Approval Of The Recommendation Of The Bac By The Local Chief Executive Of His Duly Authorized Representative Shall Issue The Notice Of Award To The Winning Bidder. Created By: Hon. Jerom T. Yepes Barangay Sk Chairman

City Government Iligan Tender

Civil And Construction...+1Building Construction
Corrigendum : Closing Date Modified
Philippines
Closing Date28 Jan 2025
Tender AmountPHP 6.7 Million (USD 114.9 K)
Details: Description Invitation To Re-bid The Iligan City Government Bids And Awards Committee (bac), Through General Fund / Sb No. 1 Cy 2023 Intend To Apply The Sum Of P6,743,095.30 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Construction Of Halfway House Including Amenities, Brgy. Rogongon, Iligan City With Project No. Cb(b)-24-123 (ceo-infra) Re-bid. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Iligan City Government Bids And Awards Committee Now Invites For The Supply And Delivery Of Items Below-stated: Particulars Construction Of Halfway House Including Amenities, Brgy. Rogongon, Iligan City • Earth Works - Excavation For Foundations , Septic Vault,ground Tank, Grease Trap And Catch Basin - Backfilling, Earth Fill And Gravel Fill For Foundations And Building Area • Concrete Works - Concreting For Foundations ,columns, Beams, Ground Floor And 2nd Floor Slabs, Staircase , Roof, Septic Vault, Ground Tank, Grease Trap And Catch Basin - Formworks For Columns And Beams, And Scaffoldings For Building Construction • Masonry Works - Chb Walling For Building Exterior (foundation To 2nd Floor) ,chb For Ground Floor Interior Walling Up To Floor Line, Chb For Septic Vault, Ground Tank, Grease Trap And Catch Basin • Steel Reinforcement - Installation Of Deformed Steel Reinforcing Bars For Concrete And Masonry Structures • Steel Works - Construction Of Roofing Trusses And Purlins • Doors & Windows - Fabrication & Installation Of Ground Floor Doors And Windows (exterior) • Tinsmithry - Building Roofing Using Prepainted Rib-type Roofing Sheets And Prefab Ridge Rolls • Plumbing - Laying Of Embedded Waste And Water Lines For Ground Floor And Second Floor I. Project Billboard (q = 2.00 Sets) Includes 4' X 8' Tarpaulin, 8' X 8' Tarpaulin, 2" X 3" X 14' Coco Lumber, 2" X 3" X 10' Coco Lumber, 2" X 2" X 8' Coco Lumber, Assorted Sizes C.w. Nails. Ii. Occupational Safety And Health Program (q = 1.00 L.s.) Includes Safety Shoes, Safety Helmet, Safety Gloves, Specialized Ppe. Iii. Permits And Clearance (q = 1.00 L.s.) Includes Fire Safety Evaluation Fee, Brgy. Clearance For Construction Fee, Professional Fee, White Print (a-3). Iv. Mobilization / Demobilization (q = 1.00 Lot) V. Earthworks (q = 253.00 Cu.m.) A. Excavation (q = 131.00 Cu.m.) Includes Volume To Be Excavated. B. Earth Fill (q = 85.00 Cu.m.) Includes Volume For Earth Fill (includes Compaction): Petrun Soil (for Earth Fill) (w/ Compaction). C. Gravel Bedding (q = 37.00 Cu.m.) Includes Volume For Gravel Bedding: 1-1/2" Gravel Bedding (0.10m Thk.). Vi. Concrete Work, Formwork &. Scaffolding (q = 148.31 Cu.m.) Includes Portland Cement Type 1astm C-150 Pns 07, Washed Sand, Washed Gravel, (for Formworks And Scaffoldings): 1.2mm Thk. X 1.0m Width Composite Steel Deck, 4'x8'x1/4"thk. Marine Plywood, 2" X 2" X 12' Coco Lumber, Assorted Sizes C.w. Nails, Steel Scaffolding (including Complete Accessories) Vii. Masonry Work ( Q = 598.28 Sq.m.) Includes 4" X 8" X 16" Chb (700psi), Portland Cement Type 1astm C-150 Pns 07, Washed Sand, Skim Coat (20kg). Viii. Steel Reinforcement ( Q = 22,027.74 Kgs.) Includes 20mmø X 6000mm Dsb (grade 40), 16mmø X 6000mm Dsb (grade 40), 12mmø X 6000mm Dsb (grade 40), 10mmø X 6000mm Dsb (grade 40), #16 Gi Tie Wire. Ix. Steel Work ( Q = 257.00 Lengths) Includes 50mm X 50mm X 6mm Thk. Angle Bar (6m/length), 38mm X 38mm X 6mm Thk. Angle Bar (6m/length), 50mm X 50mm X 2mm Thk Tubular Bar (6m/length), 50mm X 100mm X 1.2mm Thk. C-purlins (6m/length), 1.2m X 2.4m X 10mm Thk. Ms Plate, Welding Rod (6011), Grinding Disk, Cutting Disk. X. Doors &. Windows (q = 15.00 Units) Includes D1: 4000mm X 2150mm (4 - 1000mm X 2150mm Panels) Fixed Glass Partition W/ Aluminum Framed Double Glass Swing Door, W/ Complete Accessories; D6: 800mm X 2150mm Flush Door, Including Door Knob, Jambs And Accessories; Wl: 2300mm X 1200mm (4 - 600mm X1200mm Panels) Analok Frame Sliding Window W/ 1/4" Thk. Bronze Glass; W2: 2500mm X 1200mm (2 - 1250mm X 1200mm Panels) Analok Frame Sliding Window W/ 1/4" Thk. Bronze Glass; W3: 2500mm X 800mm (2 - 1250mm X 800mm Panels) Analok Frame Sliding Window W/ 1/4" Thk. Bronze Glass; W4: 600mm X 600mm Analok Frame Awning Window W/ 1/4" Thk. Bronze Glass. Xi. Tinsmithry (q = 227.00 Ln.m.) Includes 1.1m X 0.50mm Thk Prepainted Rib-type Roofing, 0.9m X 2.4m X 0.5mm Thk. Prefab Ridge Roll, Tek Screw, Vulca Seal, 5mm Thk X 1000mm Insulation Foam (50m/roll), Touch-up Paint (500ml/can) . Xii. Plumbing (q = 1.00 Lot) Includes 4"x 4" Floor Drain, Stainless; 6" Dia. X 10' Pvc Pipe, S-1000; 4" Dia. X 10' Pvc Pipe, S-1000; 2" Dia. X 10' Pvc Pipe, S-1000; 6" Dia. Pvc Cleanout; 6" Dia. Pvc Coupling; 4" Dia. Pvc Elbow, 1/4 Bend; 4" Dia. Pvc Sanitary Tee; 4" Dia. Pvc Cleanout; 4" Dia. Pvc P-trap; 4" Dia. Pvc Coupling; 6" To 4" Pvc Tee Reducer; 4" To 2" Pvc Tee Reducer; 4" To 2" Pvc Bushing Reducer; 2" Dia. Pvc Elbow, 1/4 Bend; 2" Dia. Pvc Wye; 2" Dia. Pvc Tee; 2" Dia. Pvc P-trap; 2" Dia. Pvc Cleanout; 2" Dia. Pvc Coupling; Pvc Cement,400 Cc; 1/2" Dia. G.i. Elbow; 1/2" Dia. G.i. Tee; 1/2" Dia. X 4" G.i. Nipple; 1/2" Dia. G.i. Coupling; 1/2" Dia. X 20' G.i. Pipe, S-40; 1/2" Dia. Float Valve; 1/2" Dia. Gate Valve; Teflon Tape (big). Approved Budget For The Contract (abc): P 6,743,095.30 Required Bid Security: 2% Of The Abc If Cash, Manager’s Check; Bank Draft/guarantee, Irrevocable Letter Of Credit Confirmed Or Authenticated By A Universal Or Commercial Bank; And 5% Of The Abc If Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security Delivery Period Is Within One Hundred Sixty (160) Calendar Days From Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. Interested Bidders May Obtain Further Information From Iligan City Government And Inspect The Bidding Documents During Office Hours From 8:00 A.m. – 12:00 P.m. And 1:00 P.m. – 5:00 P.m. At The Office Of The Bids And Awards Committee, Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule 1.pre - Procurement: October 18, 2024 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 2.issuance Of Bid Documents: January 7 – January 28, 2025 – 8:00 A.m. At Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. 3.pre-bid Conference: January 14, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 4.submission Of Bids: January 28, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 5.opening Of Bids: January 28, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City A Complete Set Of Bidding Documents Will Be Available To Prospective Bidders Upon Payment Of A Non-refundable Amount Of P10,000.00 To The Iligan City Government Cashier, At The Bac Office, 2nd Floor, City Hall Main Building, Buhanginan Hills, Pala-o, Iligan City. The Iligan City Government Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Furthermore, The City Government Of Iligan Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Or Loss Incurred In The Preparation And Submission Of The Eligibility Statements And Bids. Approved By: (signed)darwin J. Manubag, Phd. Bac Chairman Date Of Advertisement/posting: January 7, 2025 Place Of Posting/advertisement: City Hall/ibjt Bulletin Boards, Iligan Official Website, Phil-geps Itb No. 24-123 (ceo-infra)

DEPARTMENT OF EDUCATION SCHOOLS DIVISION OF EASTERN SAMAR Tender

Education And Training Services
Philippines
Closing Date28 Jan 2025
Tender AmountPHP 310.1 K (USD 5.2 K)
Details: Description Procurement Of Inclusive Learning Resource Centers Assistive Devices, Equipment, Supplies And Materials (lot 2- Support Service Area: Speech Therapy And Language Area) 1. The Deped Schools Division Of Eastern Samar, Through The General Appropriation Act Of 2024 Intends To Apply The Sum Of ₱ 310,183.00 Being The Abc To Payments Under The Contract For Procurement Of Inclusive Learning Resource Centers Assistive Devices, Equipment, Supplies And Materials (lot 2- Support Service Area: Speech Therapy And Language Area) Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Deped Schools Division Of Eastern Samar Now Invites Bids For The Above Procurement Project. Bidders Should Have Completed, Within 5 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. 4. Prospective Bidders May Obtain Further Information From Deped Schools Division Office Of Eastern Samar And Inspect The Bidding Documents At The Address Given Below During Monday-friday, 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Php 500.00. It May Also Be Downloaded From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Nonrefundable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Deped Schools Division Of Eastern Samar Will Hold A Pre-bid Conference On January 13, 2025, 10:00am At The Bac Office, Deped Schools Division Of Eastern Samar Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before January 27, 2025, 9:00am Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 27, 2025, 10:00am At The Given Address Below Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. Only The Proprietor Or Authorized Representative May Be Allowed To Purchase Bidding Documents. Letter Of Intent (loi), Special Power Of Attorney (spa) (for Authorized Representative), And Drl (document Request List From Philgeps) Are Required Upon Purchase. 11. The Deped Schools Division Of Eastern Samar Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Items, Specifications, Quantity Of Delivery, And Abc: Cabinet, Open Shelves 4x6 Ft 2 Set Sofa, Seating Capacity 2 Velvet: 100 % Polyester Frame Material Manufactured Wood Leg Material Manufactured Wood Seat Fill Material Foam Seat Construction Mdf Back Fill Material Foam Tufted Cushions Square Arm 1 Set Wooden Cubicle Partition, 4 Panel Divider (l 70.25 Inches X H70.25 Inches X T0.75 Inches) 4 Set Mirror, Aluminum Frame (thickness 1/4 Inch X 4 X 8 Ft) 1 Set Filing Cabinet, Vertical Filing Cabinet In 2, 3 And 4 Drawers With Plastic Divider And Central Lock Heavy Duty Construction Assembles In Minutes Power Coated Finish Anti-tilt Mechanism Quiet Closing 3 Sectional Railings For Smooth Actions Central Locking System 1 Unit Book Shelves, Plywood Construction Cladded W/ High Pressured Laminate W/ Box 3880mm L X 400mm W X 1800mm H 2 Piece Small Table With Chairs, Kindergarden Table Heavy Duty Metal Legs 60cm X 120 Cm X 55 Cm Ht Php 2,500.00 Blue Color Rectangular Table 24x48 Php 2000 Chairs 34cm D X 35 Cm L X 28 Cm Ht X 52 Cm Total Ht. Php 400 .00 (4 Chairs) 1 Set White Board, Aluminum Frame, 4 X 8 Ft. Wall Mounted 1 Piece Table, Lockable Pu Casters Dia 65mm -18mm Thickness E1grade Mdf With Marble Color Pvc Veneer -powder Coated Aluminum Frame -class 3 Gas Lift Height Adjustable Range: 77-106cm -max Loading Capacity: 60kg -tabletop With I Pad Holders 2 Unit Floor Mats, Dimension: 1mx1mx24mm Material: Rubber Colors: Blue, Red, Orange, Yellow, Green, Brown, Grey, Black, Maroon 20 Piece Phonics Phones, Pack Of 16: Perfect For Classrooms. You Get 16 Whisper Phones For Classroom Reading. 4 From Each Color. Comes In Red, Purple, Green, & Pink. Our Phonic Phone Is A Great Addition To Your Phonic Manipulative Materials, Speech Therapy Toys For Kids Package Dimensions: 8.9 X 8.9 X 4.1 Inches Item Weight: 8.8 Ounces 1 Set Communication Boards, Book And Cards Specification: Binder Features Two Interior Storage Pockets For Loose Materials, Color Black, And It Measures 9x7.5 Convenient To Travel And Put In Your Child's Backpack Or Carry In Hand. Binder Comes With 5 Different Colorful 10 Mil Poly Dividers, 3 Hard Strips (hook) Attached On Each Side To Hold 30 Cards. Each Card Measures 1.5 X 1.5. Inch Mounted With 1/2-inch Soft Dot (loop), And Round Corner Cut Safe For Little Hands From Scratching And Poking. 3 Set Augmentative Communication Systems, Pocket Go-talk 5-level Communication Device Five Message Buttons At 2.2cm X 3.8cm (7/8” X 1 1/2”) Five Recording Levels 4.16 Minutes Total Recording Time (10 Seconds Per Message) Dial Controlled Volume Button Excellent Sound Quality Two Aa Batteries Included Low Power Consumption Record And Level Lock Capable 7.6cm X 13.6cm X 3.8cm 212 Grams (7.5 Oz) 4 Unit Call Lights, With Many Colors: Red, Blue, Green Or Mix Different Color For Different Service Type It Can Work With 30 Transmitter In Max. With Separate Output Power Supply: Dc5v The Prompting Sound Can Be Turned On/off Dimension: 78*78*60mm Color: White 2 Unit Dry Erase Sleeves, Premium Materials: Dry Erase Pockets Are Durable And Durable, Which Can Withstand Lots Of Student Wear And Tear. Fantastic Idea: You Print Of The Alphabet And Kids Can Use A Dry Erase Marker To Trace The Letters. Oversize: The Width And Length Is 10 Inch * 13 Inch. The Large Size Makes It Easy To Slip Papers In And Out. Saving Money: Dry Erase Sleeves Save Money On Having To Re-purchase Workbooks For Each Child, And You Would Not Have To Print Much Paper No Residue: They Write And Wipe Off Well After The Kids Use Them. Moreover, Dry Erase Pockets Sleeves Are Definitely Long Lasting. 5 Set Wind Up Toys, Powered By A Metal Spring That Is Tightened By Turning It, Classical Funny Simple Games, Non-toxic And Odor-free. Perfect Gift For Kids Party Favors, Goodie Bags, Classroom Rewards, Stocking Stuffers, Easter Egg Stuffers. Clockwork Toy, Each Character Does A Different Trick Such As Swimming In Water, Flipping, Sliding, Spinning, Walking, Shaking Head Or Tail And Many More To Be Discovered. Wind-up Toys Measure About 2 Inch, Including Dinosaur, Egg, Cat, Bird, Caterpillar, Beetle And Car Etc. Package Content: 16 No Duplicate Wind Up Toys (contents And Color May Vary). Every One Of Them Has A Windup Mechanism. 1 Set Wordless Picture Books, Language: ‎ English Hardcover: ‎ 32 Pages Reading Age: ‎ 4 - 6 Years Item Weight: ‎ 1.28 Pounds Dimensions: ‎ 10.25 X 0.5 X 12 Inches 5 Piece File Folders, File 2 Rings 2" Thick Or 3" Thick From Cover To Cover Front, Inside And Back Cover Are All Same Cover Size: Long 14"l X 11"w X 3" Thick Color(s): Black, Blue, Green, Red 10 Piece Articulation Cards, 7 Illustrated Card Decks (448 Cards, 3¼" X 4¼") – Each Deck Of 32 Picture-word Card Pairs Targets A Specific Speech Sound - P, B, T, D, M, J, Includes Storage Tins In A Metal Tote, Master Word Lists, 50 Smiley Face Tokens, And Game Ideas Card Set 1, Card Set 2 And Card Set 3 3 Set Audio Voice Recorder, Dimensions (w X H X D) 38.3 X 114.1 X 19.3 Mm Weight 74gg Colour Black Recording Format: Dss Digital Speech Standard Digital Speech Standardmp3 Standard Playing: 35 Hr Built-in Microphone Yes Pc Connectivity Yes Expandable Memory Yes Features Frequency Response: 50 - 20000hz Connections: Usb Display: Yes Battery Type: Alkaline Aaa 2 Unit Basic Vocabulary Board, Each Unit Comes With: Flashcards Smash Mat Trace And Color Cut And Glue Flipbook Black And White Versions Of All Activities! 2 Set Kidney-shape Table With Learner's Chair, Key Features Includes Four Stacking Chairs And One 36" X 72" Kidney-shaped Activity Table The 16" Seat Height Is Recommended For Fourth Through Sixth Grade Table Tabletop Material: 1 1/8" Thick Particleboard W/ Melamine Finish Edge Band Material: 3mm Pvc Leg Material: Powder-coated Tubular Steel Height: 21" - 30" Adjustable In 1" Increments Width: 36" Length: 72" Assembly Required Warranty: 10 Years Lead Time: Supply Chain Issues Are Effecting Lead Times. Need It Quickly? Please Call (877) 839-3330 To Confirm Shipping Timelines. Shipping Method: Ground Weight: 102.00 Pounds Table Height Adjusts From 21" - 30" Available In Several Color Combinations Chairs Suggested Grade Level: 4th - 6th Seat Material: Polypropylene Frame Material: 18-gauge Tubular Steel Frame Finish: Chrome Seat Height: 16" Fully Assembled Warranty: 10 Years 1 Set Abc = 310,183.00

Western Visayas Sanitarium Doh Tender

Civil And Construction...+1Building Construction
Philippines
Closing Date28 Feb 2025
Tender AmountPHP 16.6 Million (USD 287 K)
Details: Description Republic Of The Philippines Department Of Health Western Visayas Sanitarium And General Hospital Santa Barbara, Iloilo Invitation To Bid For Completion Of Bucas Center Ib No. 2025-02-003-i The Western Visayas Sanitarium And General Hospital, Through Its Bids And Awards Committee (bac), Invites Contractors/bidders To Apply For Eligibility And To Bid For The Hereunder Projects: Name Of Project : Completion Of Bucas Center Location : Western Visayas Sanitarium And General Hospital Approved Budget For : Php 16,611,396.22 The Contract (abc) Fund Source : Caf No. 2025-008-gf Dated January 24, 2025 Contract Duration : 120 Calendar Days Description Quantity Amount Conversion Of Center For Infectious Diseases To Bucas Center 1 Cont. Job General Provisions 1. Mobilization/demobilization 1 Lot 2. Temporary Facilities 1 Lot 3. Project Bill Board 1 Lot 4. Safety And Health Program 1 Lot 5. Occupancy Permit 1 Lot Architectural Works Third Floor Interior 1. Masonry 330 Sq.m 2. Plastering 778.80 Sq.m 3. Dry Wall Partition 193 Sq.m 4. Ceiling (aluminum Panel & Fiber Cement Board) 734 Sq.m 5. Tile (floor, Toilets & Balcony) 866 Sq.m 6. Water Proofing (toilets & Balcony) 120 Sq.m 7. Doors, Windows & Glass Partitions 1 Lot • D1 - 80cmx210cm Flush Door, 6mm Thick Marine Plywood On 2"x3" Solid Hard Wood Frame & 2"x6" Solid Hard Wood Jamb, With Stainless Heavy Duty Lever Type Door Knob ,4-stainless Ball Bearing Hinges 4"x4", Door Stopper, 6mm Thick Viewing Glass, Complete Accessories 9 Set • D2 - 160cmx210cm Double Glass Door, 12mm Thick Clear Glass On Aluminum Frame With 1m Long Stainless Handle Both Sides, Complete Accessories 4 Set • D3 - 80cmx210cm Steel Door With Louver, With Stainless Heavy Duty Lever Type Door Knob ,stainless Heavy Duty Hinges, Door Stopper, Complete Accessories 1 Set • D4 - 70cmx210cm Pvc Door With Louver, With Stainless Heavy Duty Lever Type Door Knob, Complete Accessories 6 Set • D5 - 90cmx210cm Glass Door, 12mm Thick Clear Glass On Aluminum Frame With 1m Long Stainless Handle Both Sides, Complete Accessories 1 Set • W1 (1m X 0.4m) - 6mm Thick Clear Awning Window 2 Set • Glass Partition 1(2.625m X 12.16m) - 6mm Thick Clear Fix Glass On 2" X 4" & 4" X 4" Aluminum Frame With Double Glass Door 12mm Thick Clear Glass. Complete Accessories & 1m Long Stainless Handle Both Sides Per Door. 1 Set • Glass Partition 2 (2.625m X 9.85m) - 6mm Thick Clear Fix Glass On 2" X 4" & 4" X 4" Aluminum Frame With 2 - Glass Door 12mm Thick Clear Glass, Sliding Transaction. Complete Accessories & 1m Long Stainless Handle Both Sides Per Door. 1 Set • Glass Partition 3 (2.625m X 8.105m) - 6mm Thick Clear Fix Glass On 2" X 4" & 4" X 4" Aluminum Frame With 2 - Glass Door 12mm Thick Clear Glass, Sliding Transaction. Complete Accessories & 1m Long Stainless Handle Both Sides Per Door. 1 Set • Glass Partition 4 (5.8m X 1.5m) - 6mm Thick Clear Fix Glass On 2" X 4" & 4" X 4" Aluminum Frame 1 Set • Glass Partition 5 (4.8m X 1.5m) - 6mm Thick Clear Fix Glass On 2" X 4" & 4" X 4" Aluminum Frame 1 Set • Glass Partition 6 (2.625m X 10.35m) - 6mm Thick Clear Fix Glass On 2" X 4" & 4" X 4" Aluminum Frame With Double Glass Door 12mm Thick Clear Glass. Complete Accessories & 1m Long Stainless Handle Both Sides Per Door. 1 Set • Glass Partition 7 (2.625m X 7.265m) - 6mm Thick Clear Fix Glass On 2" X 4" & 4" X 4" Aluminum Frame With Double Glass Door 12mm Thick Clear Glass, Sliding Transaction. Complete Accessories & 1m Long Stainless Handle Both Sides Per Door. 1 Set • Glass Partition 8 (2.625m X 5.765m) (2.625m X 1.86m) - 6mm Thick Clear Fix Glass On 2" X 4" & 4" X 4" Aluminum Frame With Double Glass Door 12mm Thick Clear Glass, Sliding Transaction. Complete Accessories & 1m Long Stainless Handle Both Sides Per Door. 1 Set • Half Partition 1 - 6mm Thick Clear Fix Glass On 2" X 4" Aluminum Frame (2.45m X 0.565m) 1 Set • Half Partition 2 - 6mm Thick Clear Fix Glass On 2" X 4" & 4" X 4" Aluminum Frame (1.8m X 0.565m)(3.6m X 0.565m) 1 Set • Half Partition 3 - 6mm Thick Clear Fix Glass On 2" X 4" & 4" X 4" Aluminum Frame (2.36m X 0.565m)(0.55m X 0.565m)(3.225m X 0.565m) 1 Set • Half Partition 4 - 6mm Thick Clear Fix Glass On 2" X 4" Aluminum Frame (1.485m X 0.565m) 1 Set Painting (walls, Column, Ceiling & Doors)(follow Unified Color As Of Doh Ao 2022-0006) 1447 Sq.m Acrylic Signages (rooms & Directional Signs) 1 Lot Planted Column 0.91 Cu.m Beam (lintel Beam & Roof Beam) 4 Cu.m Furnitures (office Table/cubicles, Head Office Table, Office Chair, Steel Filing Open Rack & Aluminum Portable Stage Platform) 1 Lot Office Table/cubicles, Single (60cm X 120cm) 33 Set Head Office Table (80cm X 160cm) 7 Set Office Chair, Heavy Duty 40 Set Steel Filing Open Rack (6-layer Heavy Duty, Adjustable) 35 Set Aluminum Portable/detachable Stage Platform (2.5m X 8m) 20 Sq.m Sanitary & Plumbing Works Third Floor Interior 1. Installation Of Sanitary Ventilation Line 1 Lot 2. Installation Of Ppr Water Line For Lavatory & Shower 1 Lot 3. Installation Of Ppr Water Line For Water Closet 1 Lot 4. Installation Of Toilet Fixtures & Lavatory With Counter 1 Lot Lavatory With Simi-pedestal 6 Set Water Closet 6 Set 4" Stainless Floor Drain 10 Set Counter Top Lavatory On Concrete Counter Tile Finish 3 Set Mechanical Works Third Floor Interior 1. Air-conditioning System (inverter) 1 Lot 2. Fire Protection System 1 Lot Electrical Works Third Floor Interior 1 Lot 1. Roughing-ins 2. Wires And Cables 3. Lighting Fixtures 4. Wiring Devices 5. Distribution Panels And Circuit Breakers Electromechanical System Third Floor 1. Fire Detection And Alarm System 1 Lot Roughing-ins Wires And Cables Devices 2. Telephone, Lan & Cctv System 1 Lot Roughing-ins Wires And Cables Devices 3. Public Address And Background Music System 1 Lot Roughing-ins Wires And Cables Devices The Bidder’s Single Largest Completed Contract Similar To The Contract To Be Bid Should Have Been Completed Within 5 Years From The Date Of The Deadline Of Submission And Receipt Of Bids. Likewise, The Contract Price Of The Slcc Should Be At Least 50% Of The Abc. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The 2016 Revised Irr Of Ra No. 9184. Interested Bidders May Join The Pre-bid Conference And Opening Of Bids Virtually Via Google Meet In The Link Provided: Meet.google.com/deb-mcrk-wqm. The Complete Schedule Of Activities Is As Follows: Bac Activities Schedule Availability Of Bidding Documents February 6, 2025 At 8:00 Am To 4:00 Pm And Up To Before 9:00 Am Of February 28, 2025, At The Procurement/bac Office, Western Visayas Sanitarium And General Hospital, Sta. Barbara, Iloilo Pre Bid Conference February 14, 2025 (friday), 9:00 Am At The Engineering Office, Western Visayas Sanitarium And General Hospital, Sta. Barbara, Iloilo Opening Of Bids February 28, 2025 (friday) 9:00 Am At The Im Conference Room, 3rd Floor New Building, Western Visayas Sanitarium And General Hospital, Sta. Barbara, Iloilo Bid Documents May Be Acquired By Interested Bidders On The Dates And Address Above And Upon Payment Of Applicable Fee For The Bidding Documents In The Amount Of Php 25,000.00: Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Bac/procurement Office On Or Before 9:00 Am Of February 28, 2025. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Wvs.doh.gov.ph, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. The Western Visayas Sanitarium And General Hospital Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Jasond Rex A. Huyaban/jessie H. Jarbadan Ao V/procurement Unit Head / Bac Secretariat Western Visayas Sanitarium And General Hospital Sta. Barbara, Iloilo Tel. No.: (033) 332-4778 Loc. 119 Email: Wvsbac.procurement@gmail.com Website: Wvs.doh.gov.ph Dr. Renia Grace G. Salapare, Fpafp, Mpa Bac Chairperson

Department Of Education Division Of San Juan City Tender

Civil And Construction...+2Building Construction, Construction Material
Philippines
Closing Date18 Feb 2025
Tender AmountPHP 500 K (USD 8.6 K)
Details: Description Name Of Project: Conversion Of Two Rooms Into Medical And Dental Facilities Approved Budget For The Contract: Five Hundred Thousand Pesos Only (php 500,000.00) Location: Schools Division Office, San Juan City Completion Period: 30 Calendar Days Interested Suppliers Are Required To Submit Their Quotation/s Together With The Following Documentary Requirements: 1. Philgeps Registration Number Or Philgeps Certificate Of Registration (platinum); 2. Sec/dti/cda Certificate Of Registration; 3. Valid And Current Mayor’s/business Permit 2025; 4. Tax Clearance Certificate / Bir Certificate Of Registration; 5. Original And Notarized Omnibus Sworn Statement (oss). Award Of Contract Shall Be Made To The Lowest Calculated And Most Responsive Quotation, Which Complies With The Minimum Description As Stated Above And Other Terms And Conditions Stated In The Price Quotation Form In “annex B” And In The Technical Specifications Which Lists The Details Of The Requirements, As Indicated In “annex A". Submission Of Quotation And Eligibility Documents Is On Or Before 9:00 A.m. Of February 18, 2025, At The Records Unit, Ground Floor, Department Of Education – Schools Division Of San Juan City, Pinaglabanan St. San Juan City. Open Submission May Be Submitted Manually. Angelita P. Cornejo Chairperson, Bids And Awards Committee   Annex A General Instructions To Suppliers: 1. This Request For Quotation (rfq) Form Is Deped's Standard Rfq To Be Used When Deped Solicits Quotations For The Procurement Of Goods And Services. It Is A Standard Template That Suppliers Must Follow In Order To Prepare And Submit Their Quotations For Consideration By Deped. 2. This Rfq Is Composed Of One (1) Lot. Suppliers Shall Submit Their Quote For One (1) Lot. 3. Suppliers Must Fill Out The Spaces With The Necessary And Correct Information Including The Offered Brand, Model, Make And Specifications, As Well As The Total Price Of The Item Or The Items In The Lot. They Shall Likewise Indicate The Total Price Of The Said Lot. 4. Prices Must Be Quoted In Philippine Peso And Must Include The Unit Price And Total Price, Inclusive Of All Taxes, Duties And/or Levies To Be Paid And Other Incidental Costs To The Delivery Site/s If The Contract Is Awarded. 5. Award Of Contract Shall Be Made To The Lowest Quotation Which Complies With The Minimum Technical Specifications And Other Terms And Conditions Stated Herein. 6. The Rfq Form Must Be Duly Signed And Accomplished And Typewritten Or Written In Indelible Ink. Any Correction Made To The Prices, Rates Or To Any Information Shall Be Rewritten In Indelible Ink And Initialed By The Person Signing The Rfq Form. 7. Suppliers Shall Accomplish, Provide Correct And Accurate Information And Submit Request For Quotation (rfq) Form/ Abstract (annex “b”) Otherwise, Non- Submission Of Which Shall Result To Automatic Disqualification Of Proposal. 8. Documentary Requirements Must Be Properly Labeled. Bidders Must Personally Submit Their Sealed Quotation At The Records Unit, Ground Floor, Department Of Education – San Juan City Pinaglabanan St., San Juan City. 9. Program Of Works Are Indicated In “annex C”. 10. For Inquiries, Please Refer To Leovigilda G. Gempisao, Head, Bac Secretariat, Sdo-san Juan City. Contact No.: 02 8250 4528 Loc. No. 1018. Department Of Education National Capital Region Schools Division Office San Juan City Annex B (price Quotation Form) Bids And Awards Committee February 12, 2025 Closing Date February 18, 2025 Project Title: Conversion Of Two Rooms Into Medical And Dental Facilities The Bids And Award Committee Angelita P. Cornejo Bac-chairperson Department Of Education – San Juan City Pinaglabanan St. San Juan City Madam: Having Examined The Subject Request For Quotation (rfq) Including The Technical Specifications, I/we, The Undersigned Offer To Supply And Deliver The Following Items (with Our Unit Prices And Total Price): I.d. No Description Unit Qty Unit Cost Total Cost Grand Total Material Labor Material Labor General Requirements Mobilization/temporary Structures, Utilities And Safety And Health Lot 1.00 Safety And Health Lot 1.00 Sub-total 1.0000 Glass Works 6mm Thick Anneal Clear Glass On 1 3/4" X 3" Rectangular Tubular Framing With Snap-on-base And Cover Moldings, With Frosted Film Enclosure, Complete With Accessories And Fittings Sq.m 23.25 Sliding Door On Aluminum Frame With Frosted Film Enclosure, Complete With Accessories And Fittings Sq.m 3.78 Sub-total 2.0000 Carpentry Works Office Table And Overhang Cabinets Plywood 3/4" X 4' X 8' Pc 19.00 Formica Laminate, 6mm Pc 22.00 Edge Band Laminate Roll 7.00 Cwn, Assorted Kg 2.00 Clear Sliding Glass Sq.ft 23.22 Drawer Guide, Full Extension Pcs 10.00 Cabinet Lock Set 5.00 Panel Door With Glass Panes (0.90m X 2.10m) On 150mm Set 2.00 Flush Door Set 2.00 Sub-total 4.0000 Masonry Works Sq.m 1.69 Chb 4" Thk Pc 22.00 Portland Cement Bag 1.00 Washed Sand Cu.m 1.00 10mm X 6m Rsb Kg 3.00 G.i. Tie Wire Kg 1.00 Plastering Sq.m 3.38 Portland Cement Bag 2.00 Washed Sand Cu.m 1.00 Sub-total 5.0000 Plumbing Works Lavatory, Including Fittings And Accessories Set 1.00 Faucet, Lavatory Set 1.00 Water Closet 1.6gpf With Accessories Set 1.00 Water Closet Flange Set 1.00 Handheld Bidet Pc 1.00 Mirror Sq.ft 7.13 Double Bowl Kitchen Sink, Complete With Accessories And Fittings Set 1.00 Faucet, Sink Set 1.00 Waterline/plumbing Works Lot 1.00 Sub-total 6.0000 Painting Works Masonry Painting Sq.m 104.69 Neutralizer Gal 3.00 Latex, Flat Gal 9.00 Masonry Putty Gal 6.00 Latex, Semi Gloss Gal 9.00 Acri Color Gal 1.00 Steel Surface Sq.m 17.82 Primer, Epoxy Gal 1.00 Enamel, Quick Dry Gal 1.00 Paint Thinner Gal 1.00 Sub-total 10.0000 Electrical Works Roughing-ins Electrical Conduit Upvc, 20mmø Pcs 5.00 Utility Box, 2" X 4" G.i. Pcs 5.00 Wires And Fixtures 3.5mm2 Thhn Wire, Stranded M 50.00 Duplex Convenience Outlet, Grounding Type, 16a, 250v Set 5.00 2 Gang Wall Switches In One Switch Plate (16 Amp, 230v) Set 2.00 1-36w, 230v, 60hz, T5 Led Lighting Fixture, (box Type) Set 6.00 Sub-total 14.0000 Tile Works Chipping Works Sq.m 7.01 Wall Sq.m 4.76 14.0120 Glazed Wall Tiles 60cm X 60cm Pc 14.00 14.0300 Tile Adhesive 25kg/bag Bag 1.00 14.0400 Tile Trim 6mm Pc 3.00 14.0500 Tile Grout 5kg/bag Bag 1.00 Flooring Sq.m 2.25 Unglazed Floor Tiles 60cm X 60cm Pc 7.00 Tile Adhesive 25kg/bag Bag 1.00 Tile Grout 5kg/bag Bag 1.00 Sub-total 7.0000 Miscellaneous Works Demolition Of Existing Wall Sq.m 4.41 Removal And Reinstallation Of Existing Partition Lot 1.00 Installation Of Dental Chair Including Accessories And Fittings Lot 1.00 Sintra Board Signage (dental Clinic) Set 4.00 Flame Retardant Hospital Curtain Set 1.00 Curved Curtain Runners/tracks M 2.50 Black-out Pleated Blinds Including Accessories Set 1.00 Sub-total I Direct Cost Ii Indirect Cost 22% Of (i-gen.req.) Iii Tax 5% Of (i + Ii) Iv Total Construction Cost (i + Ii + Iii) The Above-quoted Prices Are Inclusive Of All Costs And Applicable Taxes. Prepared By: ____________________________ Supplier’s Representative _________________________ Contact Number _________________________ Name Of Company Annex C Program Of Works Division: Sdo San Juan Date: School I.d: - Budget Allocation Php Region: Ncy Engineering And Administrative Overhead: Php Division: City Of San Juan Approved Budget For Contract: Php Project Title: Completion Period: 30 Calendar Days Project : Conversion Of Two Rooms Into Medical And Dental Clinics Minimum Required Manpower: General Foreman Carpenter Helper Labor Plan: Minimum Required Equipment: Location: Hand Tools Pinaglabanan St., San Juan City M.m Power Tools Item I.d. Item Description % Of Total Unit Quantity Total Cost Remarks Sdo Dental Clinic General Requirements Lot 1.00 1.0000 Glass Works Sq.m 27.03 2.0000 Carpentry Works Lot 1.00 4.0000 Masonry Works Sq.m 1.69 5.0000 Plumbing Works Lot 1.00 6.0000 Painting Works Sq.m 122.51 10.0000 Electrical Works Lot 1.00 14.0000 Tile Works Sq.m 7.01 7.0000 Miscellaneous Works Lot 1.00 Sub-total Ii. Indirect Cost 22% Of (1) Overhead Expenses (8%) Contingencies (3%) Miscellaneous (1%) Contractor’s Profit (10%) Sub-total Iii. Tax 5% Of (i+ii) Sub-total Iv. Total Construction Cost (i + Ii + Iii) Prepared: ____________________________ Authorized Representative Terms And Condition 1. Bidders Shall Provide Correct And Accurate Information In This Form. 2. Price Quotation/s Must Be Valid For A Period Of Thirty (30) Calendar Days From The Date Of Submission. 3. Price Quotation/s To Be Denominated In Philippine Peso Shall Include All Taxes, Duties, And/or Levies Payable. 4. Quotations Exceeding The Approved Budget For The Contract Shall Be Rejected. 5. Award Of Contract Shall Be Made To The Lowest Quotation Which Complies With The Scope Of Works And Other Terms And Conditions Stated Herein. 6. The Quotation Of A Contractor Shall Include An Affidavit Of Site Inspection. 7. The Winning Contractor Is Hereby Required To Provide Within Ten (10) Calendar Days Upon Receipt Of The Notice Of Award (noa) The Performance Security In The Form And The Amount Stipulated In Section 39.2 Of The Irr Of Ra 9184. 8. Progress Payments Are Subject To Retention Of Ten Percent (10%) Referred To As The “retention Money” Which Shall Due For Release Upon Final Acceptance Of The Works. 9. The Contract Duration Is (15) Calendar Days, To Be Reckoned From The Date Of Receipt Of The Notice To Proceed. 10. Current Year Mayor’s/business Permit, Philgeps Registration Number, Income/business Tax Returns, Pcab License And Omnibus Sworn Statement Shall Be Attached Upon Submission Of The Quotation. 11. Mode Of Payment A. 50% Progress Payment - Upon Submission Of Statement Of Work Accomplished (swa) B. Final Billing 12. The Sdo-san Juan Shall Have The Right To Inspect The Refurbishment Of Bulletin Corners ( 2nd To 4th Floor ) To Confirm Their Conformity To The Technical Specifications & Satisfaction The Scope Of Work. 13. Liquidated Damages Equivalent To One Tenth Of One Percent (0.001%) Of The Contract Price Shall Be Imposed Per Day Of Delay. The Sdo-san Juan Shall Rescind The Contract One The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. The Above-quoted Prices Are Inclusive Of All Costs And Applicable Taxes. Very Truly Yours, ___________________________________ Name/signature Of Representative ____________________________________ Name Of Company

Municipality Of Argao, Cebu Tender

Manpower Supply
Philippines
Closing Date20 Feb 2025
Tender AmountPHP 1.4 Million (USD 25.9 K)
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 6.00 1.00 A. Backhoe (0.80 Mᶾ) 6.00 1.00 B. Dumptruck (12 Ydᶾ) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1 Ls 1.00 L.s. Project Billboard/signboard Direct Cost: A. Materials: 64.00 Sq.ft. A. Tarpaulin (4' X 8') 37.00 Bd.ft. B. Lumber Coco 1.00 Kg C. Common Nails Assorted 2.00 Sheets D. Plywood Marine (1/4" X 4' X 8') B. Manpower: Number Of Hours 4.00 1.00 A. Construction Foreman 4.00 1.00 B. Skilled Laborer 4.00 2.00 C. Unskilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Occupational Safety And Health Program Direct Cost: A. Materials: 2769.00 Man-days A. Safety Helmet 2769.00 Man-days B. Safety Shoes 2769.00 Man-days D. Working Gloves 1.00 Set E. First Aid Kit B. Manpower: Number Of Days 14.00 1.00 A. Safety Practitioner/officer (part Time) C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.3 Permits And Clearances Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Permits And Clearances Direct Cost: A. Materials: 1.00 L.s. Permits And Other Clearances - Building Permit Processing Fees B. Manpower: C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 803(1)a Structure Excavation (common Soil) Quantity 43.41 M3 Dpwh Standard Output Per Hour (oph)= 20.00 M3 43.41 M3 Structure Excavation (common Soil) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. Backhoe (0.80 Mᶾ) 1.00 2.00 B. Dumptruck (12 Ydᶾ) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(1)a Embankment From Structure Excavation Quantity 39.57 M3 Dpwh Standard Output Per Hour (oph)= 9.84 M3 39.57 M3 Embankment From Structure Excavation Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.75 1.00 A. Plate Compactor (5 Hp) 0.75 1.00 B. Backhoe (0.80 M3) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(4) Gravel Bedding Quantity 3.81 M3 Dpwh Standard Output Per Day (opd)= 1.20 M3 3.81 M3 Gravel Bedding Direct Cost: A. Materials: 1.05 M3 A. Gravel Bedding (g1)(w/5% Shrinkage Factor) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c2 "structural Concrete (footing, Slab On Fill)" Quantity 15.03 M3 Dpwh Standard Output Per Day (opd)= 0.357 M3 15.03 M3 " Structural Concrete (footing, Slab On Fill)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c3 "structural Concrete (footing Tie Beam, Wall Footing)" Quantity 2.56 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 2.56 M3 " Structural Concrete (footing Tie Beam, Wall Footing)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c4 "structural Concrete (columns)" Quantity 5.42 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 5.42 M3 " Structural Concrete (columns)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c5 "structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Quantity 3.90 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 3.90 M3 " Structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c6 "structural Concrete (suspended Slab)" Quantity 2.09 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 2.09 M3 " Structural Concrete (suspended Slab)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 902(1) "reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Quantity 3,947.39 Kg Dpwh Standard Output Per Day (opd)= 143.44 Kg 3947.39 Kg " Reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Direct Cost: A. Materials: 1.00 Kg A. Deformed Reinforcing Steel - G40 0.02 Kg B. #16galvanized Iron Wire C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: 0.50 1.00 A. Bar Cutter 0.50 1.00 B. Bar Bender Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 903 (2) Formworks And Falseworks Quantity 56.65 M2 Dpwh Standard Output Per Day (opd)= 3.24 M2 56.65 M2 Formworks And Falseworks Direct Cost: A. Materials: 0.35 Pcs A. Ordinary Plywood - 3 Uses 7.19 Bd Ft B. Good Lumber - 3 Use 0.21 Kg C. Assorted Common Wire Nail D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer Removal 0.41 1.00 A. Construction Foreman 0.41 6.00 B. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1046.00 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Quantity 188.21 M2 Dpwh Standard Output Per Day (opd)= 3.825 M2 188.21 M2 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Direct Cost: A. Materials: 13.00 Pc A. 100 Mm Thk Chb (non-load Bearing) 0.53 Bag B. Cement 0.04 Cu.m C.sand 3.24 Kg D. Reinforcing Steel 0.05 Kg E. #16 Tie Wire B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One-bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1016(1)a Waterproofing Cement Base Quantity 12.54 M2 Dpwh Standard Output Per Day (opd)= 1.875 M2 12.54 M2 Waterproofing Cement Base Direct Cost: A. Materials: 1.05 M2 A. Cement-based Waterproofing B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)b Structural Steel Roof Truss Quantity 507.84 Kg Dpwh Standard Output Per Day (opd)= 85.00 Kg 507.84 Kg Structural Steel Roof Truss Direct Cost: A. Materials: 1.00 Kg A. Structural Steel (channel Bar A36) 0.01 Kg B. Acetylene 0.02 Kg C. Oxygen 0.02 Kg D. Welding Rod E. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer Erection 0.49 3.00 A. Skilled Laborer 0.49 3.00 B. Unskilled Laborer C. Equipment And Water: 0.75 1.00 A. Welding Machine 0.25 1.00 B. Cutting Outfit 0.49 1.00 C. Truck Mounted Crane (20-25 Mt) Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)c Structural Steel Purlins Quantity 200.46 Kg Dpwh Standard Output Per Day (opd)= 90.45 Kg 200.46 Kg Structural Steel Purlins Direct Cost: A. Materials: 1.05 Kg A. Structural Steel Framing Including Cross 0.02 Kg B. Acetylene C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 2.00 A. Welding Machine Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1014.00 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Quantity 48.00 M2 Dpwh Standard Output Per Day (opd)= 2.769 M2 48.00 M2 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Direct Cost: A. Materials: 1.00 M A. Prepainted Metal Sheets (rib Type, Long Span, 0.427mm Thk. 10.00 Pc B. Tek Screw C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(1) Fabricated Metal Roofing Accessory (flashings) Quantity 54.76 M Dpwh Standard Output Per Day (opd)= 10.00 M 54.76 M Fabricated Metal Roofing Accessory (flashings) Direct Cost: A. Materials: 1.05 M A. Flashings (bended) 19.00 Pc B. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(2)c Fabricated Metal Roofing Accessory (gutter) Quantity 7.76 M Dpwh Standard Output Per Day (opd)= 11.80 M 7.76 M Fabricated Metal Roofing Accessory (gutter) Direct Cost: A. Materials: 1.05 M A. Gutter (0.4 Mm) 3.00 Pc B. 12" X 1" Plain Gi Strap 16.00 Pc C. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1038(1) "reflective Insulation" Quantity 50.00 M2 Dpwh Standard Output Per Day (opd)= 5.56 M2 50.00 M2 " Reflective Insulation" Direct Cost: A. Materials: 1.00 M2 A. Reflective Insulation B. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1100(10) Conduit Works, Boxes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= "1.00 I.s." 1.00 I.s. Conduit Works, Boxes And Fittings Direct Cost: A. Materials: 1.00 Length A. 25 Mm Ø X 3.00 M Rsc Pipe 80.00 Length B. 15 Mm Ø X 3.00 Mm Pvc Pipes 10.00 Pcs C. 15mm Ø Pvc Coupling 30.00 Pcs D. 15mm Ø Pvc Elbow 25.00 Pcs E. Utility Box 30.00 Pcs F. Junction Box 1.00 Pcs G. 25mm Ø Entrance Cap H. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 47.39 1.00 A. Construction Foreman 47.39 1.00 B. Skilled Laborer 47.39 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1101(33) Wires And Wiring Devices Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= 1.00 I.s. 1.00 I.s. Wires And Wiring Devices Direct Cost: A. Materials: 200.00 M A.3.5 Mm2 Electric Wire Thhn 160.00 M B.5.5 Mm2 Electric Wire Thhn 25.00 M C. 8.00 Mm2 Electric Wire (thhn) 1.00 Set D. Single-gang Switch 4.00 Set E. Two-gang Switch 2.00 Set F. Three-gang Switch 13.00 Set G. Duplex Convenience Outlet H. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 28.05 1.00 A. Construction Foreman 28.05 1.00 B. Skilled Laborer 28.05 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1102(1) Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Quantity 1.00 Set Dpwh Standard Output Per Day (opd)= 1 Set 1.00 Set Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Direct Cost: A. Materials: 1.00 Set A. Panel Board With Main Breaker And 8 Branches 50 Amp - 200 Amp 1.00 Pcs B. 60 Amp. Plug-in Breaker 2.00 Pcs B. 30 Amp. Plug-in Breaker 2.00 Pcs B. 20 Amp. Plug-in Breaker 2.00 Pcs B. 15 Amp. Plug-in Breaker B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 5.50 1.00 A. Construction Foreman 5.50 1.00 B. Skilled Laborer 5.50 2.00 C. Unskilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1001 (8) Sewer Line Work Quantity 1.00 Ls Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 Ls Sewer Line Work Direct Cost: A. Materials: 7.00 Lengths A. 50 Mm Ø Pvc Pipe,series 1000 3.00 Lengths B. 100 Mm Ø Pvc Pipe, Series 1000 8.00 Pcs C. Pvc 45 Deg. (3mm Bend X 50mm) 2.00 Pcs D. Pvc 45 Deg. (3mm Bend X 101mm) 2.00 Pcs E. Pvc 87.5 Deg. (6mm Bend X 101mm) 1.00 Pcs F. Pvc 45 Deg. Single Branch, Wye (101mm X 101mm) 1.00 Pcs G. Pvc 87.5 Deg. Single Branch, Seep, Tee (101mm X 50mm) 6.00 Pcs H. Pvc Coupling (50mm D) 2.00 Pcs I. Pvc Coupling3 (101mm D) 1.00 Pcs J. Pvc P-trap W/ Plug & Sealing Rings (50mm) 1.00 Pcs K. Pvc P-trap W/ Plug & Sealing Rings (101mm) 2.00 Pcs L. Pvc Cleanout W/ Plug & Sealing Rings (101mm) M. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 10.00 1.00 A. Construction Foreman 10.00 1.00 B. Skilled Laborer 10.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1001 (9) Storm Drainage And Downspout Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Storm Drainage And Downspout Direct Cost: A. Materials: 8.00 Lengths A. 75 Mm Ø Pvc Pipe,series 1000 9.00 Ea B. Pvc 45 Deg. (3mm Bend X 76mm) 5.00 Ea C. Pvc Coupling (76mm D) D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 8.00 1.00 A. Construction Foreman 8.00 1.00 B. Skilled Laborer 8.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1002(6) Cold Waterline Pipes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= "1.00 I.s." 1.00 I.s. Cold Waterline Pipes And Fittings Direct Cost: A. Materials: 5.00 Lengths A.13 Mm Ø X 4.00 M (ppr) Pipe, Pn 20 5.00 Pcs B.13 Mm Ø Ppr Elbow - Threaded 10.00 Pcs C.13 Mm Ø Ppr Elbow 10.00 Pcs D.13 Mm Ø Ppr Coupling 2.00 Pcs E.13 Mm Ø Gate Valve 2.00 Pcs F.13 Mm Ø Ppr Union 5.00 Pcs G.13 Mm Ø Ppr Tee H. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 6.65 1.00 A. Construction Foreman 6.65 1.00 B. Skilled Laborer 6.65 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)c Painting Works (metal Painting) Quantity 58.55 M2 Dpwh Standard Output Per Day (opd)= 2.00 M2 58.55 M2 Painting Works (metal Painting) Direct Cost: A. Materials: 0.05 Gal A. Red Oxide Primer 0.10 Gal B. Enamel Paint 0.25 L C. Paint Thinner D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)

Municipality Of Argao, Cebu Tender

Manpower Supply
Philippines
Closing Date20 Feb 2025
Tender AmountPHP 1.4 Million (USD 25.9 K)
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 6.00 1.00 A. Backhoe (0.80 Mᶾ) 6.00 1.00 B. Dumptruck (12 Ydᶾ) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Project Billboard/signboard Direct Cost: A. Materials: 64.00 Sq.ft. A. Tarpaulin (4' X 8') 37.00 Bd.ft. B. Lumber Coco 1.00 Kg C. Common Nails Assorted 2.00 Sheets D. Plywood Marine (1/4" X 4' X 8') B. Manpower: Number Of Days 4.00 1.00 A. Construction Foreman 4.00 1.00 B. Skilled Laborer 4.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. B.7(2) Direct Cost: A. Materials: 2769.00 Man-days A. Safety Helmet 2769.00 Man-days B. Safety Shoes 2769.00 Man-days C. Working Gloves 1.00 Set D. First Aid Kit B. Manpower: Number Of Days 14.00 1.00 A. Safety Practitioner/officer (part Time) C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.3 Permits And Clearances Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Permits And Clearances Direct Cost: A. Materials: 1.00 L.s. Permits And Other Clearances B. Manpower: - Building Permit Processing Fees C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 803(1)a Structure Excavation (common Soil) Quantity 43.41 M3 Dpwh Standard Output Per Hour (oph)= 20.00 M3 43.41 M3 Structure Excavation (common Soil) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. Backhoe (0.80 Mᶾ) 1.00 2.00 B. Dumptruck (12 Ydᶾ) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(1)a Embankment From Structure Excavation Quantity 39.57 M3 Dpwh Standard Output Per Hour (oph)= 9.84 M3 39.57 M3 Embankment From Structure Excavation Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.75 1.00 A. Plate Compactor (5 Hp) 0.75 1.00 B. Backhoe (0.80 M3) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(4) Gravel Bedding Quantity 3.81 M3 Dpwh Standard Output Per Day (opd)= 1.20 M3 3.81 M3 Gravel Bedding Direct Cost: A. Materials: 1.05 M3 A. Gravel Bedding (g1)(w/5% Shrinkage Factor) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: 1.05 M3 A. Plate Compactor (5 Hp) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c2 "structural Concrete (footing, Slab On Fill)" Quantity 15.03 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 15.03 M3 " Structural Concrete (footing, Slab On Fill)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c3 "structural Concrete (footing Tie Beam, Wall Footing)" Quantity 2.56 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 2.56 M3 " Structural Concrete (footing Tie Beam, Wall Footing)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c4 "structural Concrete (columns)" Quantity 5.42 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 5.42 M3 " Structural Concrete (columns)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c5 "structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Quantity 3.90 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 3.90 M3 " Structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c6 "structural Concrete (suspended Slab)" Quantity 2.09 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 2.09 M3 " Structural Concrete (suspended Slab)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 902(1) "reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Quantity 3,947.39 Kg Dpwh Standard Output Per Day (opd)= 143.44 Kg 3947.39 Kg " Reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Direct Cost: A. Materials: 1.00 Kg A. Deformed Reinforcing Steel - G40 0.02 Kg B. #16galvanized Iron Wire C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: 0.50 1.00 A. Bar Cutter 0.50 1.00 B. Bar Bender Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 903 (2) Formworks And Falseworks Quantity 56.65 M2 Dpwh Standard Output Per Day (opd)= 3.24 M2 56.65 M2 Formworks And Falseworks Direct Cost: A. Materials: 0.35 Pcs A. Ordinary Plywood - 3 Uses 7.19 Bd Ft B. Good Lumber - 3 Use 0.21 Kg C. Assorted Common Wire Nail D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer Removal 0.41 1.00 A. Construction Foreman 0.41 6.00 B. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1046.00 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Quantity 188.21 M2 Dpwh Standard Output Per Day (opd)= 3.825 M2 188.21 M2 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Direct Cost: A. Materials: 13.00 Pc A. 100 Mm Thk Chb (non-load Bearing) 0.53 Bag B. Cement 0.04 Cu.m C.sand 3.24 Kg D. Reinforcing Steel 0.05 Kg E. #16 Tie Wire B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One-bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1016(1)a Waterproofing Cement Base Quantity 12.54 M2 Dpwh Standard Output Per Day (opd)= 1.875 M2 12.54 M2 Waterproofing Cement Base Direct Cost: A. Materials: 1.05 M2 A. Cement-based Waterproofing B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)b Structural Steel Roof Truss Quantity 507.84 Kg Dpwh Standard Output Per Day (opd)= 85.00 Kg 507.84 Kg Structural Steel Roof Truss Direct Cost: A. Materials: 1.00 Kg A. Structural Steel (channel Bar A36) 0.01 Kg B. Acetylene 0.02 Kg C. Oxygen 0.02 Kg D. Welding Rod E. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days Fabrication 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer Erection 0.49 3.00 A. Skilled Laborer 0.49 3.00 B. Unskilled Laborer C. Equipment And Water: 0.75 1.00 A. Welding Machine 0.25 1.00 B. Cutting Outfit 0.49 1.00 C. Truck Mounted Crane (20-25 Mt) Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)c Structural Steel Purtins Quantity 200.46 Kg Dpwh Standard Output Per Day (opd)= 90.45 Kg 200.46 Kg Structural Steel Purtins Direct Cost: A. Materials: 1.05 Kg A. Structural Steel Framing Including Cross 0.02 Kg B. Acetylene C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 2.00 A. Welding Machine Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1014.00 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Quantity 48.00 M2 Dpwh Standard Output Per Day (opd)= 2.769 M2 48.00 M2 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Direct Cost: A. Materials: 1.00 M A. Prepainted Metal Sheets (rib Type, Long Span, 0.427mm Thk. 10.00 Pc B. Tek Screw C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(1) Fabricated Metal Roofing Accessory (flashings) Quantity 54.76 M Dpwh Standard Output Per Day (opd)= 10.00 M 54.76 M Fabricated Metal Roofing Accessory (flashings) Direct Cost: A. Materials: 1.05 M A. Flashings (bended) 19.00 Pc B. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(2)c Fabricated Metal Roofing Accessory (gutter) Quantity 7.76 M Dpwh Standard Output Per Day (opd)= 11.80 M 7.76 M Fabricated Metal Roofing Accessory (gutter) Direct Cost: A. Materials: 1.05 M A. Gutter (0.4 Mm) 3.00 Pc B. 12" X 1" Plain Gi Strap 16.00 Pc C. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1038(1) "reflective Insulation" Quantity 50.00 M2 Dpwh Standard Output Per Day (opd)= 50.00 M2 50.00 M2 " Reflective Insulation" Direct Cost: A. Materials: 1.00 M2 A. Reflective Insulation B. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1100(10) Conduit Works, Boxes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= "1.00 I.s." 1.00 I.s. Conduit Works, Boxes And Fittings Direct Cost: A. Materials: 1.00 Length A. 25 Mm Ø X 3.00 M Rsc Pipe 80.00 Length B. 15 Mm Ø X 3.00 Mm Pvc Pipes 10.00 Pcs C. 15mm Ø Pvc Coupling 30.00 Pcs D. 15mm Ø Pvc Elbow 25.00 Pcs E. Utility Box 30.00 Pcs F. Junction Box 1.00 Pcs G. 25mm Ø Entrance Cap H. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 47.39 1.00 A. Construction Foreman 47.39 1.00 B. Skilled Laborer 47.39 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1101(33) Wires And Wiring Devices Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= 1.00 I.s. 1.00 I.s. Wires And Wiring Devices Direct Cost: A. Materials: 200.00 M A.3.5 Mm2 Electric Wire Thhn 160.00 M B.5.5 Mm2 Electric Wire Thhn 25.00 M C. 8.00 Mm2 Electric Wire (thhn) 1.00 Set D. Single-gang Switch 4.00 Set E. Two-gang Switch 2.00 Set F. Three-gang Switch 13.00 Set G. Duplex Convenience Outlet H. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 28.05 1.00 A. Construction Foreman 28.05 1.00 B. Skilled Laborer 28.05 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1102(1) Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Quantity 1.00 Set Dpwh Standard Output Per Day (opd)= 1 Set 1.00 Set Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Direct Cost: A. Materials: 1.00 Set A. Panel Board With Main Breaker And 8 Branches 50 Amp - 200 Amp 1.00 Pcs B. 60 Amp. Plug-in Breaker 2.00 Pcs B. 30 Amp. Plug-in Breaker 2.00 Pcs B. 20 Amp. Plug-in Breaker 2.00 Pcs B. 15 Amp. Plug-in Breaker B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Days 5.50 1.00 A. Construction Foreman 5.50 1.00 B. Skilled Laborer 5.50 2.00 C. Unskilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1001 (8) Sewer Line Work Quantity 1.00 Ls Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 Ls Sewer Line Work Direct Cost: A. Materials: 7.00 Lengths A. 50 Mm Ø Pvc Pipe,series 1000 3.00 Lengths B. 100 Mm Ø Pvc Pipe, Series 1000 8.00 Pcs C. Pvc 45 Deg. (3mm Bend X 50mm) 2.00 Pcs D. Pvc 45 Deg. (3mm Bend X 101mm) 2.00 Pcs E. Pvc 87.5 Deg. (6mm Bend X 101mm) 1.00 Pcs F. Pvc 45 Deg. Single Branch, Wye (101mm X 101mm) 1.00 Pcs G. Pvc 87.5 Deg. Single Branch, Seep, Tee (101mm X 50mm) 6.00 Pcs H. Pvc Coupling (50mm D) 2.00 Pcs I. Pvc Coupling3 (101mm D) 1.00 Pcs J. Pvc P-trap W/ Plug & Sealing Rings (50mm) 1.00 Pcs K. Pvc P-trap W/ Plug & Sealing Rings (101mm) 2.00 Pcs L. Pvc Cleanout W/ Plug & Sealing Rings (101mm) M. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 10.00 1.00 A. Construction Foreman 10.00 1.00 B. Skilled Laborer 10.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1001 (9) Storm Drainage And Downspout Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Storm Drainage And Downspout Direct Cost: A. Materials: 8.00 Lengths A. 75 Mm Ø Pvc Pipe,series 1000 9.00 Ea B. Pvc 45 Deg. (3mm Bend X 76mm) 5.00 Ea C. Pvc Coupling (76mm D) D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 8.00 1.00 A. Construction Foreman 8.00 1.00 B. Skilled Laborer 8.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1002(6) Cold Waterline Pipes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= "1.00 I.s." 1.00 I.s. Cold Waterline Pipes And Fittings Direct Cost: A. Materials: 5.00 Lengths A.13 Mm Ø X 4.00 M (ppr) Pipe, Pn 20 5.00 Pcs B.13 Mm Ø Ppr Elbow - Threaded 10.00 Pcs C.13 Mm Ø Ppr Elbow 10.00 Pcs D.13 Mm Ø Ppr Coupling 2.00 Pcs E.13 Mm Ø Gate Valve 2.00 Pcs F.13 Mm Ø Ppr Union 5.00 Pcs G.13 Mm Ø Ppr Tee H. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 6.65 1.00 A. Construction Foreman 6.65 1.00 B. Skilled Laborer 6.65 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)c Painting Works (metal Painting) Quantity 58.55 M2 Dpwh Standard Output Per Day (opd)= 2.00 M2 58.55 M2 Painting Works (metal Painting) Direct Cost: A. Materials: 0.05 Gal A. Red Oxide Primer 0.10 Gal B. Enamel Paint 0.25 L C. Paint Thinner D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)
2251-2260 of 2288 archived Tenders