Painting Tenders
Painting Tenders
Department Of Defence Production Tender
Goods
Healthcare and Medicine
GEM
India
Description: BOQ ITEMS: Inj Lignocaine HCl 2% without adrenaline vial of 30 ml, Lignocaine Hcl Inj 2 percentage Solution With Adrenaline 1 80000 In 2ml Cartridge Pkt Of 50, Electrolyte Solution bott of 05 litre for Disinfectant Generating System, Dycal calcium hydroxide pkt of two tubes, Antiseptic mouth wash containing Sodium Fluoride and Triclosan Bottle of 100 ML, Gel for root canal preparation containing water soluble lubricant EDTA, Urea, Hydrogen peroxide tube of 3.5 gm, Clove Oil bottle of 50 Ml, Desensitizing Paste (Stannous Fluoride /Potassium Nitrate / Sodium Mono fluorophosphates)tube of 50 gm, Chlorohexidine Mouth wash 0.2% bott of 100 ML, Post Extraction Dressing (alveogyl), Pulp Devitalizer non arsenic (CAUSTINERF FORTE), Triamcinolone acetonide 0.1% for oral use tube of 5 gm, Periodontal pack (non eugenol) two paste system, Sodium hypochlorite 5% bott of 500 ml, Sterillium bott of 500 ml, Cetrimide & Chlorhexidine gluconate bott of 01 ltr, Spirit (Alcohol) bott of 500 ml for spirit lamp, Hydrogen peroxide solution bott of 500 ml, Paraformaldehyde Tab pkt of 100, Povidone iodine 5% bott of 100 Ml, Dextrose Monohydrate for oral use pack of 100 gm, Gelatin sponge, Disposable Gown, Shoe cover disposable pkt of 100, Sugical gloves size 8, Knife BP handle No 10 Pkt of 6, Knife BP handle No 11 Pkt of 6, Knife BP handle No 12 Pkt of 6, Knife BP handle No 15 pkt of 6, Syringe disposable 2 ml pkt of 100, Syringe disposable 5 ml pkt of 100, Syringe disposable 10 ml pkt of 100, Diamond bur round for airotor pkt of 05, Diamond bur inverted cone for airotor pkt of 05, Diamond bur straight for airotor pkt of 05, Antiseptic pain relieving gel for dental tube of 15 gm/m, Cloth glass polishing (Bleached Calico cotton white) 1X1/2 metres, Denture adhesive powder bottle of 10-15gm, Bite registeration paste silicone based set of two cart of 48-50ml each, Lubricant spray bott of 300 ml, Cloth Napkin absorbant dental disposable 15x15cm pkt of 500, Plaster of Paris special Dental-Grade 1pkt of 01 kg, Articulating paper, Patient bib plastic, Sintered Diamond burs for grinding metal for SHP assorted, Suction cleaning solution bott of 1 ltr, MTA based root canal sealer pack of 2-3gm, Cold mould seal bott of 500 ml, Crown and bridge polishing compound for NP alloys 200gm cake, Crown and bridge polishing emery for NP alloys grain size 120microns 50m roll, Disc, abrasive rubber wheel for polishing metal, pkt of 100, Dental stone pkt of 01 kg, Pumice powder superfine bag of 1 kg, Self-cure acrylic powder pink shade bott of 110gm with rapid repair liquid 110ml, Self-cure acrylic powder clear shade bott
of 110gm with rapid repair liquid 110ml, Wheel wool polishing, Oral surgical bur straight for SHP, Spray anaesthetic surface bott of 100ml, Syringe hypodermic cartridge type
needle 22mm long presterilized disposable
pkt of 100 for, Syringe hypodermic cartridge type needle
35 mm long presterlised disposable pkt of 100, Polishing cup rubber, mounted soft for RAHP pkt of 12, Impression alginate material pkt of 450 gms, Paste Impression pkt of two tubes containing ZnO Base125-165 gm & catalyst, Die stone pkt of 100 gm, Crown preparation Kit containing
14-16 points, Elastomeric impression material pkt of
light body, Broach nerve canal barbed assorted size pkt of 12, Dental nano composite restorative kit photo cure complete, Flowable light-cure Composite kit, GP Point 2% 15 To 40, GP Point 4% 15 To 40, Hand Niti File assorted length 21 mm, Light cure Calcium hydroxide, De-soft denture relining material, Medicament root canal formocresol-bott of 5ml, Sodium hypochlorite 2%, Matrix retainer SS (Ivory pattern) Band for, pkt of 12, Outfit Matrix SS (Siqveland) bands
narrow for, Paper Point assorted 15 To 40, Root canal sealer paste for obturation containing two tubes/preloaded syringes, Self-Etching Bonding system, Mineral trioxide aggregate MTA) pkt of 1 gm, Rotary NiTi file assorted size Sx F3 length 21 mm, Rotary NiTi file assorted size Sx F3 length 25 mm, Endodontic access burs-set of 06, K files stainless steel size No 8 length 25 mm set
of 6, K files stainless steel size No.10 length 25 mm set
of 6, K files stainless steel length 25 mm size
no 15-40, K files stainless steel length 25 mm size no 45-80
set of 6, H file stainless steel Size No 15-40 ,
length 21 mm set of 06, H file stainless steel Size No 45-80, length 21 mm set of 06, GP solvent-bott of 10 ml, Gauze Ribbon Absorbant Folded 2.5 Cm X 100 Meters, Pad abdominal swab 40x25cm, Pad, cotton wool, dental box of 100, Wool cotton rolls absorbent size dental pkt of 100, Nitrile gloves size small pkt of 50 pair, Nitrile gloves size medium pkt of 50 pair, Nitrile gloves size large pkt of 50 pair, Bioresorbable demineralized bone graft substitute 0.5-1cc freeze-dried bone 0.20-0.25gm x 2 vial (Dental bone graft), Dentin replacement material consisting of calcium silicate based powder & calcium chloride liquid in box of 5 capsules & 5 liquid tubes (Biodentine), Interdental Brush Pkt of 05, Dental Floss, Zirconomer restorative material, Gum Paint
Closing Soon8 Jan 2025
Tender AmountRefer Documents
Municipality Of Kauswagan, Lanao Del Norte Tender
Furnitures and Fixtures
Philippines
Details: Description Qty Unit Item Description Estimated Unit Price Total Unit Price 14 Pcs 4 X 4 X 12ft Coco Lumber 345.00 4,830.00 32 Pcs 2 X 4 X 12ft Coco Lumber 195.00 6,240.00 75 Pcs 2 X 3 X 10ft Coco Lumber 135.00 10,125.00 85 Pcs 2 X 2 X 10ft Coco Lumber 95.00 8,075.00 15 Kgs Cwn #5 85.00 1,275.00 30 Kgs Cwn #4 85.00 2,550.00 35 Kgs Cwn #3 85.00 2,975.00 10 Box Cwn #2 ½ 2,350.00 23,500.00 15 Kgs Cwn #2 85.00 1,275.00 5 Kgs Hardi Nails 135.00 675.00 18 Pcs Ordinary Plywood ½ 810.00 14,580.00 12 Pcs Ordinary Plywood ¾ 1,450.00 17,400.00 2 Rolls Nylon #60 85.00 170.00 16 Bundles 1 X 2 X 8ft Good Lumber 200.00 3,200.00 50 Pcs 2 X 3 X 12ft Coco Lumber 145.00 7,250.00 100 Pcs 2 X 2 X 12ft Coco Lumber 95.00 9,500.00 7 Pcs Safety Gloves 65.00 455.00 2 Gals Flat Latex White 895.00 1,790.00 3 Gals Qde Chocolate Brown 895.00 2,685.00 4 Pcs Paint Roller #9 165.00 660.00 3 Gals Body Filler 795.00 2,385.00 1 Pair Putty Knife 38.00 38.00 90 Mtrs Trapal 80.00 7,200.00 25 Kgs Tie Wire 98.00 2,450.00 10 Kgs Welding Rod 6011 210.00 2,100.00 40 Pcs Dsb 8mm 135.00 5,400.00 10 Rolls Nylon Rope #5 800.00 8,000.00 1 Pc Staple Gun 895.00 895.00 3 Boxes Crown Staple 295.00 885.00
Closing Soon8 Jan 2025
Tender AmountPHP 148.5 K (USD 2.5 K)
City Of Cape Town Tender
Machinery and Tools...+1Furnitures and Fixtures
South Africa
Details: Rfq Type Goods Goods Tools & Machinery Reference Number Gd12500479 Title Toolbox Custom Made Ply 390hx430wx900mml Description 20 Each X Toolbox Custom Made Ply 390hx430wx900mml Specification* 1. Nb The Municipal Bidding Document 6.1 (mbd 6.1) Is Attached, In Order To Be Eligible For Preference Points Bidders Are Required To Submit A Duly Completed Mbd 6.1 Document With Supporting Documents With Each And Every Rfq Submission, Failure To Submit Will Result In Zero Point Allocation. 2. Please Ensure That You Attach The Technical Data Sheets And Pictures Of The Item Quoted On, To Your Rfq Submission****failure To Adhere To This Requirement, May Result In Your Offer Being Non-responsive**** 3. Wherever Reference Is Made To Any Particular Trade Mark, Name, Patent, Design, Type, Specific Origin Or Producer, Such Reference Shall Be Deemed To Be Accompanied By The Words "or Equivalent Toolbox Type Custom Made Material Plywood Size Of Box 390mm (h) X 430mm (w) X 900mm (l) Size Of Lid 90mmx430mmx900mm Type Of Wood Marine Ply Wood Bwp / (is 710), 25mm Specifications Supply And Fit 2 X 50mm Heavy Duty Hinges, 2 X Handles 150mm, Heavy Duty Hasp And Staple. Paint Primer Undercoat Finish With 2 Coats Of Cloud Grey High Gloss, Chain Attached To Box Lid On 90º Angle Standards En636 Tolerance A Tolerance Of 2.5% Of The Specified Dimensions Will Be Accepted. Delivery Date2025/02/03 Delivery Toelectricity Ndabeni Red1 Plant / Ph 511 0410 Delivery Address0000 Melck Street, Ndabeni Contact Persona.filby Telephone Number0214009269 Cell Number Closing Date2025/01/16 Closing Time12 00 Pm Rfq Submission Fax0000000000 Rfq Submission Fax 2 Buyer Email Addressgd1.quotations@capetown.gov.za Buyer Detailsa.filby Buyer Phone0214009269 Attachments No Attachments Note This Commodity Has Gone Live For Only Quoting On The E-procurement Portal. No Manual Submissions Will Be Accepted For This Commodities. Suppliers Will Need Must Log In To E-services Portal To Access Rfqs. Bids Must Be Compliant With The Preferential Procurement Regulations, 2017 Including But Not Limited To Local Content, Functionality, Price And Preference, Eligibility Criteria And Relevant Statutory Criteria. The Details Of This Are Contained In The Rfq Document And/or The Specification Advertised Via E-procurement. Only Locally Produced Goods Or Locally Manufactured Goods, Meeting The Stipulated Minimum Threshold For Local Production And Content, Will Be Considered, Where Applicable.
Closing Date16 Jan 2025
Tender AmountRefer Documents
Angono Elementary School Tender
Publishing and Printing
Philippines
Details: Description 65 Pcs. Utility Pail With Metal Handle (24 Liters) 65 Pcs. Plastic Water Dipper 5 Pcs. Mop Bucket And Wringer (19 Liters) 14 Gallon Bleach Original 20 Pack Paper Towel (175 Pulls X 6) 20 Pack Tissue Paper, 2 Ply (12's) 40 Pack Detergent Powder (2 Kg.) 30 Pcs. All Purpose Cleaner (140 Ml.) 20 Pcs. Bleach Toilet Cleaner (250 Ml.) 90 Pcs. Hand Soap, Liquid (500 Ml.) 90 Pcs. Hand Sanitizer 60 Pcs. Liquid Disinfectant (900 Ml.) 60 Pcs. Air Freshener Aerosol (280 Ml.) 50 Pack Multi Purpose Round Rags (50"s) 50 Pack Garbage Bag, Black, Xl (100"s) 60 Pcs. Trash Can, 50l 30 Pcs. Faucet 50 Ream Typewriting Paper, Long (70gsm) 50 Ream Typewriting Paper, A4 (70 Gsm) 120 Pcs. Permanent Marker Pentel, Black Broad 120 Pcs. Permanent Marker Ink Refill (32 Ml.), Black 5 Bundle Manila Paper (480s) 20 Pack Vellum Paper (180 Gsm), Short 100 Pcs. Plastic Envelope, Long 3000 Pcs. Brown Envelope, Short 10 Pack Photo Paper (260 Gsm), A4 20s 10 Pack Sticker Paper (10s), A4 15 Doz. Sign Pen (0.7 Mm), Black 5 Doz. Sign Pen (0.7 Mm), Green 5 Doz. Sign Pen (0.7 Mm), Blue 120 Pcs. Scissors 8" 120 Pcs. Multi-purpose Glue (130 G.) 50 Pack Parchment Paper, Short 20 Pack Board Paper, Long (180 Gsm) 12 Pcs. Styrofoam Board, White (2" X 4" X 1") 20 Rolls Ribbon, Assorted Color (2") 20 Pcs. Cartolina, Assorted Color 10 Pack Thumbtacks 55 Ream Typewriting Paper, Long (70gsm) 120 Pcs. Double Sided-tape (1") 120 Pcs. Double Sided-tape (1/2") 120 Pcs. Scotch Tape, Transparent (1") 120 Pcs. Masking Tape (1") 120 Pcs. Hot Melt Glue Gun (20 W) 120 Pcs. Hot Melt Glue Stick, 100s (7mm X 190 Mm) 120 Pcs. Acrylic Paint, Assorted Color (100 Ml.) 120 Ream Colored Paper, Long
Closing Soon7 Jan 2025
Tender AmountPHP 479.1 K (USD 8.2 K)
Services Of The Prime Minister Tender
Others
France
Details: The purpose of this contract is to provide routine maintenance work and minor repairs (electricity, plumbing, sanitation, painting, partitions, flexible floors, false ceilings, carpentry, metalwork, etc.) for the Economic, Social and Environmental Council.
Closing Date27 Jan 2025
Tender AmountRefer Documents
Department Of Public Works And Highways Tender
Civil And Construction...+1Construction Material
Philippines
Details: Description Invitation To Bid For Contract Id No. 24gnd0012 - Supply And Delivery Of Additional Construction Materials For Use In The Maintenance Activities Of The Maintenance Section. The Dpwh Butuan City District Engineering Office, Through The Fy 2024 General Appropriations Act (gaa) Intends To Apply The Sum Of P 10,000,000.00 Being The Abc To Payments Under The Contract For Contract Id No. 24gnd0012 – Supply And Delivery Of Additional Construction Materials For Use In The Maintenance Activities Of The Maintenance Section. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Dpwh Butuan City District Engineering Office Now Invites Bids For The Above Procurement Project, As Follows: Item No. Item Description Quantity Unit 1 Reflectorized Thermoplastic Pavement Markings White Asshto M 249-12 1300 Bags 2 Reflectorized Thermoplastic Pavement Markings Yellow Asshto M 249-09 800 Bags 3 Primer Thermo 330 Pails 4 Glass Beads 500 Bags 5 Traffic Paint, Reflectorized White 200 Gal 6 Traffic Paint, Reflectorized Yellow 200 Gal 7 2”x3”x8’ Lumber 50 Pc 8 1”x4”x10’ Lumber 30 Pc 9 2”x2”x8’ Lawaan Lumber 40 Pc 10 2”x2”x10’ Lawaan Lumber 40 Pc 11 1”x2”x4’ Selected Sticks Lawaan 25 Bundle 12 1”x2”x8’ Stick 25 Bundle 13 1”x2”x10’ Stick 25 Bundle 14 1/2”x2”x8’ Stick 25 Bundle 15 Concrete Nails #4 25 Kls 16 C.w. Nails #1 ½ 25 Kls 17 C.w. Nails #2 25 Kls 18 C.w. Nails # 2 ½ 25 Kls 19 C.w. Nails # 3 25 Kls 20 C.w. Nails #4 25 Kls Delivery Of The Goods Is Required Within 20 Calendar Days Upon Receipt Of The Notice To Proceed (ntp). Bidders Should Have Completed, Within 10 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. Prospective Bidders May Obtain Further Information From Dpwh Butuan City District Engineering Office And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8:00 Am To 5:00 Pm. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 27, 2024-january 15, 2025 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of P 10,000.00. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. The Dpwh Butuan City District Engineering Office Will Hold A Pre-bid Conference On January 3, 2025 At 2:30 Pm At Dpwh - Butuan City District Engineering Office Noa Hall, Which Shall Be Open To Prospective Bidders. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. Bid Opening Shall Be On January 15, 2025 At Dpwh - Butuan City District Engineering Office Noa Hall At 1:30 Pm At The Given Address Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. The Schedule Of Key Procurement Activities Is Shown Below: Issuance Of Bidding Documents December 27, 2024- January 15, 2025 Hard Copies At Bac Secretariat Of This Office Downloadable @ Dpwh Website Www.dpwh.gov.ph And Philgeps Website Www.philgeps.gov.ph Pre-bid Conference January 3, 2025 @ 2:30 Pm Dpwh- Butuan City Deo Noa Hall Deadline For Submission Of Bids January 15, 2025 @ 1:30 Pm Dpwh- Butuan City Deo Noa Hall Opening Of Bids January 15, 2025 @ 1:30 Pm Dpwh- Butuan City Deo Noa Hall The Dpwh Butuan City District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Head, Procurement Staff: Bac Chairman: Teresita E. Pagar Rolito P. Pancito Engineer Iii Engineer Iii Dpwh- Butuan City Deo Dpwh- Butuan City Deo Tel. No. (085) 225-2022 Local 84661 Tel. No. (085) 225-2022 Local 84603 Approved By: Rolito P. Pancito Engineer Iii Bac Chairperson You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps And Dpwh Websites For Online Bid Submission: Philgeps And Dpwh Websites Date Of Publication: December 27, 2024-january 15, 2025
Closing Date15 Jan 2025
Tender AmountPHP 10 Million (USD 172.3 K)
NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION USA Tender
Civil And Construction...+1Others
United States
Details: **please Read This Notice Carefully As It Constitutes The Only Notice That Will Be Issued**
a. Far 12.603 Streamlined Solicitation For Commercial Products Or Commercial Services
this Is A Combined Synopsis/solicitation For Commercial Products Or Commercial Services Prepared In Accordance With The Format In Far Subpart 12.6, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Proposals Are Being Requested And A Written Solicitation Will Not Be Issued.
the Request For Proposal (rfp) Number For This Project Is 693jj925r000012. The Resultant Contract Award Will Be Performed At The Office Of Vehicle Safety Compliance’s (ovsc’s) San Angelo Test Facility (satf) Located On The Grounds Of Goodfellow Air Force Base (gafb) In San Angelo, Tx. The Contract Type Will Be Firm Fixed-price.
the Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Fac Number 2025-01 With The Effective Date Of 11/12/2024.
the North American Industrial Classification System (naics) Code For This Procurement Is 237310 “highway, Street, And Bridge Construction” -, With A Small Business Size Standard Of $45,000,000.00. The Product Service Code For This Procurement Is Y1lb “construction Of Highways, Roads, Streets, Bridges, And Railways”. This Solicitation Is Not Set-aside For Small Businesses.
contract Price.
b. Price Schedule
b.1 Base Period Of Performance:
total Price Shall Cover The Performance Period From The Effective Date Of Award Through Twenty-four (24) Months Thereafter.
from: 01/xx/2025 To: 01/xx/2026
base Period, Contract Price: $tbd
line Item Number
item Description
qty
unit
unit
price
total Extended Price
0001
resurface Utqg Standards Traction Asphalt Test Surface
1
lot
-
$tbd
total Contract Firm Fixed-price
$tbd
statement Of Work (sow)
c. Description/specifications/ Statement Of Work
c.1 Background
the National Highway Traffic Safety Administration (nhtsa) Has A Need To Resurface The Asphalt Test Surface Portion Of The Traction Grading Test Track Used To Perform Testing In Accordance With The Uniform Tire Quality Grading System (utqgs) At The Office Of Vehicle Safety Compliance’s (ovsc’s) San Angelo Test Facility (satf) Located On The Grounds Of Goodfellow Air Force Base (gafb) In San Angelo, Texas (tx). The Asphalt Test Surface Was Last Resurfaced In September 2013. The Test Surface Is Used By Ovsc To Perform Traction Testing For Enforcement Of The Utqg Consumer Information Program. The Test Surface Is Also Used By Outside Entities To Perform Traction Testing.
the Utqg Traction Test Measures The Slide Friction Coefficient Of Tires Using A Tire Traction Skid Trailer At A Test Speed Of 40 Miles Per Hour (mph). The Allowable Surface Coefficient Range Per 49 C.f.r. § 575.104 Is 0.50 ± 0.10. This Value Is Measured Using The American Society For Testing And Materials (astm) E 501 Tire With A Test Load Of 1,085lbs And An Onboard Watering System With An Output Of Approximately 4.0 Gpm Per Wetted Inch Of Nozzle Width.
c.2 Contract Objectives
the Objective Of This Contract Is To Replace The Asphalt Utqg Traction Test Surface Located At The Satf Located On Gafb In San Angelo, Tx With A Durable Surface That Meets The Tire Test Surfaces Specified In 49 C.f.r. § 575.104.
this May Include, But Is Not Limited To, Identifying A Suitable Replacement Asphalt Mix With Test Strips, Removing The Existing Surface, Placing A New Asphalt Surface, And Re-painting The Required Lines.
the Purpose Of The New Test Surface Is To Satisfy The Government’s Need To Have A Nhtsa Traction Asphalt Test Surface Located At Its San Angelo Test Facility (satf) Located On The Grounds Of Goodfellow Air Force Base (gafb) In San Angelo, Texas (tx).
the Intended Use Of The Test Surface That Is To Be Provided To The Government Is To Conduct Compliance Testing For Tire Traction Ratings, Which Require A Surface That Is Within The Uniform Tire Quality Grading System (utqgs) Allowable Surface Friction Range And Possesses The Quality, Durability, And Smoothness Needed For Traction Testing.
all Work Completed Must Be In Compliance With All Applicable Rules And Regulations Of Gafb.
c.3 General Requirements
phase One (1) Test Stripe Surface Application
the Contractor Shall Schedule All Work Under This Contract With The Contracting Officer’s Representative (cor).
the Contractor Shall Identify A Suitable Asphalt Mix Design Through The Placement And Evaluation Of A Test Strip, Removing The Existing Test Surface (if Required), Replacing The Test Surface, And Ensuring Smooth Transitions To And From The Test Surface, To Include Painting Of The Completed Test Surface. The Contractor Shall Meet All Work Requirements For Gafb Including Certain Requirements And Approvals That Must Be Met And/or Obtained Prior To The Start Of Work By The Contractor.
the Contractor Shall Be Responsible For The Following:
c.3.1 The Contractor, Inclusive Of Contractor Personnel And Subcontractors Supporting This Project On-site At The Satf, Must Meet All Air Force Base (afb) Security Requirements. This Will Include Background And Verification Checks Required Prior To Base Access. The General Requirements May Be Found At: Https://www.goodfellow.af.mil/home/visitor-control-center-gate-information/
the Contractor Must Provide A List Of All Personnel Who Will Be Accessing The Base And All Required Information To Include The Following: (full Name, Date Of Birth, Driver’s License No. W/state Of Issuance, And Last Four (4) Of Ssn) To The Cor For The Contractor Personnel To Gain Approval To Access The Base. This Process Can Take Between 2-4 Weeks To Complete From The Time The List Is Submitted. This List Must Be Provided To The Cor Via Email Within 1 Month Of The Completion Of The Kick-off Meeting.
c.3.2 The Contractor Must Meet All Other Afb Requirements That Are In Effect At And During Time Of Project, Including But Not Limited To, Obtaining Environmental Approval For All Materials Required To Complete The Project.
c.3.3 The Contractor Shall Ensure That Its Equipment And Operations Does Not Interfere With Afb Operations At Any Time During Project.
c.3.4 Parking On Turf Or Base Roads Is Not Permitted Without Prior Approval From The Cor.
c.3.5 All Equipment, (e.g., Vehicles) Shall Pass Through An Inspection Station When Accessing The Afb Or Whenever Entering The Afb Located At:
4368 S Chadbourne St.
san Angelo, Tx
76905
note: The Inspection Station Is Located At The South Gate, Near The Visitor’s Center Entrance To The Base.
c.3.6 Upon Completion Of The Project The Contractor Shall Perform Cleanup Of Debris From All Work Areas. The Contractor Shall Collect All Trash, Debris, Refuse, Garbage, Etc., That Is Generated, And Place It In Appropriate Containers Or Vehicles As Directed By The Cor. The Contractor Shall Haul Materials From The Site By Appropriate Means As Needed. The Contractor Shall Ensure Proper Disposal Of Materials Outside The Limits Of Government Property. The Contractor Shall Ensure That Disposal By Recycling, Sanitary Landfill Or Other Approved Methods Conforms To All Local, State, And Federal Guidelines, Criteria, And Regulations. Upon Completion Of The Work, The Contractor Shall Leave The Work Site And Any Storage Area(s) In A Clean, Neat, And Orderly Condition As Determined By The Cor. The Cor Will Inspect The Work Site, Prior To The Contractor’s Final Departure From The Site, To Confirm That The Work Site Is In A Satisfactory Condition.
c.3.7 The Contractor Shall Comply With All Occupational Safety And Health Administration (osha) Regulations While Executing Contract Activities.
c.3.8 The Contractor Shall Comply And Ensure That All Subcontractors, If Any, Comply With All Applicable Federal, State, And Local Laws, Regulations, Ordinances, And Standards Related To Any Environmental Matters. The Contractor Shall Also Comply And Ensure That All Subcontractors, If Any, Comply With All Specific Instructions Or Directions Provided To The Contractor By Goodfellow Afb Regarding Any Environmental Or Safety Matters.
c.3.9 The Contractor Shall Execute The Work For This Project In The Best And Most Competent Manner, By Qualified And Efficient Contractor Personnel, Skilled In Their Respective Trades. The Contractor Shall Coordinate And Perform All Operations In A Manner That Will Result In A Professional And Expeditiously Completed Project. The Contractor Shall Conduct The Work In Strict Accordance With Prevailing Industry Standards And Manufacturer’s Instructions. The Contractor Shall Ensure That The Work And Materials Comply With Industry Best Practices For Quality And Technical/performance Requirements For This Project As Described Herein And (the Resultant Contract Award) For All Applicable Criteria, Regulations, Guidelines, And Codes, All Of Which Are Made A Part Thereof.
c.3.10 Normal Working Hours For Satf Personnel Are Monday Through Friday Between The Hours Of 7:00 A.m. And 4:00 P.m. Excluding Saturdays, Sundays, And Federal Holidays. If Noncontractor Personnel (e.g. Federal Or Nhtsa Contractor Personnel) Are Reasonably Available, The Contracting Officer May Authorize The Contractor To Perform Work During Periods Other Than The Normal Tour Of Duty For Work Hours/days.
c.4 Test Surface Specific Requirements
c.4.1 Kick-off Meeting
within Two (2) Weeks Of The Effective Date Of The Contract, The Contractor Shall Participate In A Kick-off Meeting With The Contracting Officer’s Representative (cor), Contracting Officer (co), And Other Nhtsa Staff. The Kickoff Meeting Will Take Place Via Teleconference And Will Be Approximately Two Hours In Length. The Contractor Shall Make A Brief Presentation Of Their Understanding Of The Contract Requirements. After The Presentation, The Parties Shall Discuss Basic Contract Requirements, Including The Schedule For Evaluations And Operational Procedures. Washington, Dc, Based Nhtsa Staff May Join Via Teleconference For These Discussions.
c.4.2 The Contractor Shall Clean And Remove All Grass, Weeds, Debris, And Soil From Cracks In The Asphalt Test Surface Prior To Beginning Paving.
c.4.3 The Contractor Shall Remove The Existing Surface; Or Subject To Cor Approval Repair The Existing Asphalt Test Surface With A Suitable Crack Sealant.
c.4.4 The Contractor Shall Design An Asphalt Mix That They Believe Is Capable Of Meeting The Required Performance Characteristics Detailed In Section C.4.6 Prior To Applying The Test Strip.
the Contractor Shall Prepare And Install An Initial Test Strip Before Installing The Full Asphalt Test Surface. The Contractor Shall Place A Test Strip That Is 10 Feet Wide And 150 Feet Long In The Shoulder Area Adjacent To The Asphalt Test Surface. The Purpose Of The Test Strip Is To Demonstrate The Wet Traction Coefficient Of Friction And Durability Of The Asphalt Mix Design. Alternatively, The Contractor May Place A Test Strip Of The Proposed Asphalt Mix Design At Satf Or Another Location (upon Approval By The Government And Within A 150-mile Radius Of Satf), So That Satf Personnel Can Access And Evaluate The Test Strip In A Manner Consistent With The Location At Satf.
the Government Will Burnish And Test The Surface For Wet Traction Coefficient Of Friction And Durability.
2) The Government Will Discuss The Results Of The Testing With The Contractor.
if An Additional Test Strip Is Required; The Following Procedure Will Be Followed:
the Contractor Shall Then Adjust The Asphalt Mix Design As Required To Meet The Friction Coefficient And Durability Requirements And Install Another Complete Asphalt Test Strip In The Same General Area As The Previous One; As Described In Paragraph (c.4.4.a, Above). The Contract Will Require Successful Paving Of At Least One Test Strip That Meets The Required Wet Traction Coefficient Of Friction And Desired Durability Prior To Receipt Of Approval By The Co In Order To Move Onto Phase 2 For Paving Of The Full Asphalt Test Surface.
once The Government Determines That The Test Strip Meets Durability And Skid Coefficient Requirements, The Contractor Will Be Notified By The Co That It May Proceed To The Task Detailed At C.4.5 Below.
phase Two (2) Full Asphalt Test Surface Application
c.4.5 The Contractor Shall Provide A Surface Within The Target Range For The Wet Slide Coefficient Of Friction Of 0.55µ To 0.62µ After Curing And The Government Has Burnished The Surface. The Coefficient Of Friction Will Be Measure By The Government Using The Utqg Traction Test Procedure And An Astm E 501 Tire.
c.4.6 Additional Construction Requirements
a. The Contractor Shall Prepare And Install An Asphalt And Aggregate Seal Coat Overlay On The Entire Test Surface And Shoulders, 1000 Feet Long And 104 Feet Wide, That Will Serve In Part As A Moisture Barrier.
b. The Test Procedure Requires A Traction Testing Apparatus Consisting Of A Pickup Truck And Instrumented Trailer To Travel At A Steady Speed Of 40 Mph. The Contractor Shall Construct The New Asphalt Test Surface In A Way That Allows For A Very Smooth Transition From The Oval Track Road To The Test Surface With No Perceptible Impact To The Driver And Enough Distance For The Vertical Loads To Settle Out Of The Suspension Prior To Reaching The First Test Location. The Contractor Shall Ensure The Exit Ramp Of The Test Surface Meets The Same Requirements. The Contractor Shall Ensure That The Surface Transition Is Smooth From Both Directions In The Event That Traffic Flow Is Reversed.
c. The Contractor Shall Ensure That The Final Test Surface Is Smooth And Free Of Bumps, Divots, Or Any Other Surface Disturbances. These Things Will Cause Transient Disturbances In Traction Testing Data Which Will Increase Test Variability And Produce Bad Data.
d. The Contractor Shall Ensure That There Are No Foreign Objects Purposefully Or Accidentally Left In The Test Surface. The Contractor Shall Ensure That The Surface Is A Smooth, Finished, Homogenous, Asphalt Surface.
e. The Contractor Shall Ensure That There Are No Longitudinal Or Horizontal Cracks In The Final Test Surface. The Contractor Shall Ensure That The Construction Seams Between Asphalt Lays Are Minimal With No Vertical Difference Between Lays.
f. The Contractor Shall Ensure That The Final Density Is Such That The Surface Can Support The Static And Dynamic Loads Of The Trailer Traction Testing Apparatus For The Extent Of The Test Surface Life Without Rutting.
c.4.7 At Transition Areas Between The Test Surface And The Non-test Surface, The Contractor Must Provide:
a. Butt Joints To Transition To And From Asphalt Test Areas To Ensure Structural Integrity And Smooth Transition To The Asphalt Roadway Surface.
b. Provide A Smooth Transition Between The Test Surface And The Non-test Surface, Such That, The Driver Of An Instrumented Skid Trailer Driving Over The Transition Area Will Not Feel A Bump And The Data Acquisition System Will Not Be Affected As The Various Axles Pass Over The Transition Area.
c. Two Full-width, Ramp-like Surface Grades Of 100 Feet Length Each. The Contractor Shall Ensure That Each Grading Has A Gradual Height Transition From The Original Non-test Asphalt Surface With Overlay To The Existing Concrete Test Surface.
c.4.8 The Contractor Shall Paint New Lane Stripes On The New Test Surface That Duplicate The Color, Width And Length Of The Old Lane Stripes, I.e., Alternating Yellow And White Stripes, 10 Feet Long, Beginning 10 Feet Prior To Entering Skid Pad Test Surface From Both Directions And A Lateral Midpoint Stripe.
c.4.9 The Government Will Evaluate The Completed Test Surface And Provide Final Acceptance To The Contractor. The Government Will Provide Final Acceptance Within Two (2) Months Of The Completion Of The Lane Stripes Being Completed.
c.4.10 The Contractor Shall Provide All Quality Assurance Or Quality Control Data And Documentation For Any Of The Materials And Test Surface Along With The Final Mix Design To The Cor. These Documents Must Be Provided Within 3 Weeks Of The Government’s Final Acceptance Of The Completed Test Surface.
c.5 Proprietary Or Confidential Information
consistent With The Data Rights Clause In Section (viii) Below Of This Agreement, The Contractor May Identify Any Proprietary Or Any Confidential Data Or Information Needed In The Performance Of The Contract. The Contractor Must Comply With The Data Rights Clause In This Agreement To Notify And Identify The Data Or Information With Limited Rights. The Government Can Assist The Contractor To Identify Limited Rights Data Consistent With The Data Rights Clause.
delivery Date, Acceptance (f.o.b. Destination)
date Of Delivery
the Period Of Performance For This Contract Shall Be Twelve (12) Months From Date Of Award. (dates Tbd)
place Of Delivery
department Of Transportation
national Highway Traffic Safety Administration
office Of Vehicle Safety (nef-220)
131 Comanche Trail Building 3527
goodfellow Afb, Texas 76908
contracting Officer’s Representative (cor) – Tbd
alternate Contracting Officer’s Representative (acor) – Tbd
inspection:
inspection And Acceptance
far 52.252-2 Clauses Incorporated By Reference (feb 1998)
this Solicitation Incorporates One Or More Clauses By Reference, With The Same Force And
effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make
their Full Text Available. Also, The Full Text Of A Clause May Be Accessed Electronically At
this/these Address(es): Www.acquisition.gov/far
note: Those Clauses Marked With An “x” Are Hereby Incorporated By Reference.
applicable
“x”
far Clause Number
far Clause Title
(thru Fac 2005-99)
x
52.246-4
inspection Of Services—fixed-price (aug 1996)
inspection And/or Acceptance
the Cor As Designated In This Effort Shall Be Responsible For Performing The Inspection Of All Services Rendered Under This Award And For Recommending Acceptance Of Replacement/correction Of Services Or Materials That Fail To Meet The Requirements To The Contracting Officer.
the Cor Will Also Be Responsible To The Contracting Officer For Recommending Acceptance Or Replacement/correction Of Nonconforming Supplies Or Services That Fail To Meet The Requirements.
rejection Of A Final Report Will Delay Final Payment Of Costs Due Under The Effort. The Most Common Causes For Rejecting Final Reports Are:
incomplete Description Of The Work Objective And Its Relationship To Other Work Performed In The Area.
inadequate Description Of Methodology
insufficient Or Inconsistent Technical Information To Support The Findings Or Conclusions.
poorly Conceived Graphs, Charts, And Displays.
incorrect Spelling And Grammar
agency Personnel Responsible For Inspection
the Contracting Officer’s Representative (cor) As Designated In This Effort, Will Be Responsible For Performing The Inspection Of All Services Rendered Under This Award And For Recommending Acceptance Or Replacement/correction Of Services Or Materials That Fail To Meet The Requirements To The Contracting Officer.
milestones And Deliverables:
deliverables/milestones
the Following Milestones And Deliverables Apply To This Contract And Are Considered Critical To The Successful Completion Of The Project.
item No.
section
deliverable (d) /milestone (m)
estimated Timeline
1
c.4.1
(phase 1)
kickoff Meeting (m)
within Two (2) Weeks After Contract Award (aca)
2
c.3.1
contractor Submits Personnel List With Required Information For Base Security Checks (d)
within One (1) Month Of Item 1
3
c.3.1
personnel List Is Approved (m)
typically 2-4 Weeks From Item 2 Completion
4
c.4.4
contractor And Cor Determine Test Strip Start Date (m)
tbd
5
c.4.4
contractor Places Test Strip (d)
tbd
6
c.4.4.a.1
satf Completes Evaluation Of Test Strip (m)
within 2 Months Of Item 5 Completion
7
c.4.4.a.2
satf Discusses Test Strip Results With Contractor (m)
within 1 Week Of Item 6 Completion
8
c.4.4.b.1
(retest; If Required)
contractor Places Additional Test Strip (d)
if Applicable
9
c.4.4.a.1
(retest; If Required) Satf Completes Evaluation Of Additional Test Strip (m)
within 2 Months Of Item 8 Completion
10
c.4.4.b.2
satf Approves Mix Design (m)
within One (1) Week Of Identifying A Test Strip That Meets The Performance Criteria
11
c.4.5
(phase 2 Begins) Upon Approval
contractor Places Full Test Surface (d)
tbd
12
c.4.8
contractor Paints Test Surface (d)
tbd
13
c.4.9
satf Accepts Final Test Surface (m)
within Two (2) Months Of Item 12 Completion
14
c.4.10
contractor Provides Satf With All Qa/qc Data And Final Mix Design (d)
within Three (3) Weeks Of Item 13 Completion
payment Schedule:
Contract Payment Schedule
the Following Payment Schedule Is Hereby Incorporated And Applicable To All Payments To Be Made Under This Contract.
payment Schedule
task #
task Order Payment Schedule Milestones
percentage Of Total Price
c.4.1
kickoff Meeting
1%
c.4.4.b.2
test Strip Meets Skid Coefficient Requirements
20%
c.4.7
full Asphalt Test Surface
45%
c.4.7 & C.4.8
non-test Surface & Painting
24%
c.4.10
qa/qc Data And Final Mix Design
10%
100%
total Firm Fixed-price Amount
$tbd
far 52.212-1 -- Instructions To Offerors-commercial Products And Commercial Services (sep 2023) Is Applicable To This Solicitation.
Additional Clauses Incorporated By Reference (feb 1998)
Far Clauses Incorporated By Reference
this Solicitation And Any Resulting Contract Incorporates One Or More Clauses By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officerwill Make Their Full Text Available. Also, The Full Text Of A Clause May Be Accessed Electronically At This Address: Www.acquisition.gov/far
fac Number: 2025-01
effective Date: 11-12-2024
52.202-1 Definitions (jun 2020)
52.203-3 Gratuities (apr 1984)
52.203-5 Covenant Against Contingent Fees (may 2014)
52.203-6 Restrictions Of Subcontractor Sales To The Government (jun 2020)
52.203-7 Anti-kickback Procedures (jun 2020)
52.203-8 Cancellation, Recission, And Recovery Of Funds For Illegal Or Improper Activity (may 2014)
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity (may 2014)
52.203-12 Limitation On Payments To Influence Certain Federal Transactions (jun 2020)
52.204-4 Printed Or Copied Double-sided On Postconsumer Fiber Content Paper (may 2011)
52.204-10 Reporting Executive Compensation And First-tier Subcontract Awards (jun 2020)
52.204-18 Commercial And Government Entity Code Maintenance (aug 2020)
52-209-6 Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment (nov 2021)
52.209-9 Updates Of Publicly Available Information Regarding Responsibility Matters (oct 2018)
52.213-1 Fast Payment Procedure (may 2006)
52.215-2 Audit And Records-negotiation (jun 2020)
52.215-8 Order Of Precedence-uniform Contract Format (oct 1997)
52.215-11 Price Reductions For Defective Certified Cost Or Pricing Data-modifications (jun 2020)
52.215-13 Subcontractor Certified Cost Or Pricing Data-modifications (jun 2020)
52.215-14 Integrity Of Unit Prices (nov 2021)
52.215-23 Limitations On Pass-through Charges (jun 2020)
52.216-7 Allowable Cost And Payment (aug 2018)
52.222-2 Payment For Overtime Premiums (july 1990)
52.222-3 Convict Labor (jun 2003)
52.222-21 Prohibition Of Segregated Facilities (apr 2015)
52.222-26 Equal Opportunity (sept 2016)
52.222-35 Equal Opportunity For Veterans (jun 2020)
52.222-36 Equal Opportunity For Workers With Disabilities (jun 2020)
52.222-37 Employment Reports On Veterans (jun 2020)
52.222-38 Compliance With Veterans’ Employment Reporting Requirements (feb 2016)
52.222-40 Notification Of Employee Rights Under The National Labor Relations Act (dec 2010)
52.222-50 Combating Trafficking In Persons (nov 2021)
52.222-54 Employment Eligibility Verification (may 2022)
52.223-6 Drug-free Workplace (may 2001)
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving (jun 2020)
52.225-1 Buy American-supplies (oct 2022)
52.225-3 Buy American-free Trade Agreements-israeli Trade Act (nov 2023)
52.225-13 Restrictions On Certain Foreign Purchases (feb 2021)
52.227-1 Authorization And Consent (jun 2020)
52.227-2 Notice And Assistance Regarding Patent And Copyright Infringement (jun 2020)
52.227-3 Patent Indemnity (apr 1984)
52.227-14 Rights In Data-general (may 2014), (alternate I) (dec 2007), And (alternate Ii) (dec 2007)
52.227-16 Additional Data Requirements (june 1987)
52.227-17 Rights In Date-special Works (dec 2007)
52.228-7 Insurance-liability To Third Persons (mar 1996)
52.230-2 Cost Accounting Standards (jun 2020)
52.230-3 Disclosure And Consistency Of Cost Accounting Practices (jun 2020)
52.230-6 Administration Of Cost Accounting Standards (june 2010)
52.232-17 Interest (may 2014)
52.232-20 Limitation Of Cost (apr 1984)
52.232-22 Limitation Of Funds (apr 1984)
52.232-23 Assignment Of Claims (may 2014)
52.232-25 Prompt Payment (jan 2017) Alternate I (feb 2002)
52.232-33 Payment By Electronic Funds Transfer-system For Award Management (oct 2018)
52.232-34 Payment By Electronic Funds Transfer-other Than System For Award Management (jul 2013)
52.232-39 Unenforceability Of Unauthorized Obligations (jun 2013)
52.232-40 Providing Accelerated Payments To Small Business Subcontractors (mar 2023)
52.233-1 Disputes (may 2014) Alternate I (dec 1991)
52.233-3 Protest After Award (aug 1996) Alternate I (jun 1985)
52.233-4 Applicable Law For Breach Of Contract Claim (oct 2004)
52.237-3 Continuity Of Services (jan 1991)
52.242-1 Notice Of Intent To Disallow Costs (apr 1984)
52.242-3 Penalties For Unallowable Costs (dec 2022)
52.242-4 Certification Of Final Indirect Costs (jan 1997)
52.242-13 Bankruptcy (july 1995)
52.243-2 Changes-cost-reimbursement (aug 1987) Alternate Ii (apr 1984)
52.244-2 Subcontracts (jun 2020) Alternate I (jun 2020)
52.244-5 Competition In Subcontracting (aug 2024)
52.245-1 Government Property (sep 2021) Alternate I (apr 2012)
52.245-2 Government Property Installation Operation Services (apr 2012)
52.245-9 Use And Charges (apr 2012)
52.246-1 Contractor Inspection Requirements (apr 1984)
52.246-25 Limitation Of Liability-services (feb 1997)
52.247-29 F.o.b. Origin (feb 2006)
52.247-34 F.o.b. Destination (jan 1991)
52.249-6 Termination (cost-reimbursement) (may 2004)
52.249-14 Excusable Delays (apr 1984)
52.251-1 Government Supply Sources (apr 2012)
52.253-1 Computer Generated Forms (jan 1991)
Federal Acquisition Regulation (far) Clauses Provided In Full Text
this Contract Incorporates The Following Federal Acquisition Regulation Clauses Provided In Full Text:
Far 52.204-27 - Prohibition On A Bytedance Covered Application (jun 2023)
(a) Definitions. As Used In This Clause—
covered Application Means The Social Networking Service Tiktok Or Any Successor Application Or Service Developed Or Provided By Bytedance Limited Or An Entity Owned By Bytedance Limited.
information Technology, As Defined In 40 U.s.c. 11101(6)—
(1) Means Any Equipment Or Interconnected System Or Subsystem Of Equipment, Used In The Automatic Acquisition, Storage, Analysis, Evaluation, Manipulation, Management, Movement, Control, Display, Switching, Interchange, Transmission, Or Reception Of Data Or Information By The Executive Agency, If The Equipment Is Used By The Executive Agency Directly Or Is Used By A Contractor Under A Contract With The Executive Agency That Requires The Use—
(i) Of That Equipment; Or
(ii) Of That Equipment To A Significant Extent In The Performance Of A Service Or The Furnishing Of A Product;
(2) Includes Computers, Ancillary Equipment (including Imaging Peripherals, Input, Output, And Storage Devices Necessary For Security And Surveillance), Peripheral Equipment Designed To Be Controlled By The Central Processing Unit Of A Computer, Software, Firmware And Similar Procedures, Services (including Support Services), And Related Resources; But
(3) Does Not Include Any Equipment Acquired By A Federal Contractor Incidental To A Federal Contract.
(b) Prohibition. Section 102 Of Division R Of The Consolidated Appropriations Act, 2023 (pub. L. 117-328), The No Tiktok On Government Devices Act, And Its Implementing Guidance Under Office Of Management And Budget (omb) Memorandum M-23-13, Dated February 27, 2023, “no Tiktok On Government Devices” Implementation Guidance, Collectively Prohibit The Presence Or Use Of A Covered Application On Executive Agency Information Technology, Including Certain Equipment Used By Federal Contractors. The Contractor Is Prohibited From Having Or Using A Covered Application On Any Information Technology Owned Or Managed By The Government, Or On Any Information Technology Used Or Provided By The Contractor Under This Contract, Including Equipment Provided By The Contractor’s Employees; However, This Prohibition Does Not Apply If The Contracting Officer Provides Written Notification To The Contractor That An Exception Has Been Granted In Accordance With Omb Memorandum M-23-13.
(c) Subcontracts. The Contractor Shall Insert The Substance Of This Clause, Including This Paragraph (c), In All Subcontracts, Including Subcontracts For The Acquisition Of Commercial Products Or Commercial Services.
(end Of Clause)
far 52.223-99 – Ensuring Adequate Covid-19 Safety Protocols For Federal Contractors (oct 2021) (deviation 2022-01)
(a) Definition. As Used In This Clause -
united States Or Its Outlying Areas Means—
(1) The Fifty States;
(2) The District Of Columbia;
(3) The Commonwealths Of Puerto Rico And The Northern Mariana Islands;
(4) The Territories Of American Samoa, Guam, And The United States Virgin Islands; And
(5) The Minor Outlying Islands Of Baker Island, Howland Island, Jarvis Island, Johnston Atoll, Kingman Reef, Midway Islands, Navassa Island, Palmyra Atoll, And Wake Atoll.
(b) Authority. This Clause Implements Executive Order 14042, Ensuring Adequate Covid Safety Protocols For Federal Contractors, Dated September 9, 2021 (published In The Federal Register On September 14, 2021, 86 Fr 50985).
(c) Compliance. The Contractor Shall Comply With All Guidance, Including Guidance Conveyed Through Frequently Asked Questions, As Amended During The Performance Of This Contract, For Contractor Or Subcontractor Workplace Locations Published By The Safer Federal Workforce Task Force (task Force Guidance) At Https:/www.saferfederalworkforce.gov/contractors/.
(d) Subcontracts. The Contractor Shall Include The Substance Of This Clause, Including This Paragraph (d), In Subcontracts At Any Tier That Exceed The Simplified Acquisition Threshold, As Defined In Federal Acquisition Regulation 2.101 On The Date Of Subcontract Award, And Are For Services, Including Construction, Performed In Whole Or In Part Within The United States Or Its Outlying Areas.
(end Of Clause)
the Government Will Take No Action To Enforce The Clause Implementing Requirements Of Executive Order 14042, Absent Further Written Notice From The Agency, Where The Place Of Performance Identified In The Contract Is In A U.s. State Or Outlying Area Subject To A Court Order Prohibiting The Application Of Requirements Pursuant To The Executive Order (hereinafter, “excluded State Or Outlying Area”). In All Other Circumstances, The Government Will Enforce The Clause, Except For Contractor Employees Who Perform Substantial Work On Or In Connection With A Covered Contract In An Excluded State Or Outlying Area, Or In A Covered Contractor Workplace Located In An Excluded State Or Outlying Area. A Current List Of Such Excluded States And Outlying Areas Is Maintained At Https://www.saferfederalworkforce.gov/contractors/.
department Of Transportation Acquisition Regulation (tar) Clauses Incorporated By Reference
this Contract Incorporates The Following Transportation Acquisition Regulation Clauses (tar) By Reference (with The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make The Full Text Available.
1252.237-70 Qualifications Of Contractor Employees (nov 2022)
1252.237-72 Prohibition On Advertising (nov 2022)
1252.239-70 Security Requirements For Unclassified Information Technology Resources (nov 2022)
1252.239-71 Information Technology Security Plan And Accreditation (nov 2022)
1252.239-72 Compliance With Safeguarding Dot Sensitive Data Controls (nov 2022)
1252.239-73 Limitations On The Use Or Disclosure Of Third-party Contractor Reported Cyber Incident Information (nov 2022)
1252.239-74 Safeguarding Dot Sensitive Data And Cyber Incident Reporting
(nov 2022)
1252.239-75 Dot Protection Of Information About Individuals, Pii, And Privacy Risk Management Requirements (nov 2022)
1252.239-91 Records Management (nov 2022)
1252.239-92 Information And Communication Technology Accessibility Notice
(nov 2022)
1252.239-93 Information And Communication Technology Accessibility (nov 2022)
1252.242-71 Contractor Testimony (nov 2022)
1252.242-72 Dissemination Of Information (nov 2022)
1252.242-74 Contract Audit Support (nov 2022)
department Of Transportation Acquisition Regulation (tar) Clauses Incorporated In Full Text
tar 1252.223-73 Seat Belt Use Policies And Programs (nov 2022)
in Accordance With Executive Order 13043, Increasing Seat Belt Use In The United States, Dated April 16, 1997, The Contractor Is Encouraged To Adopt And Enforce On-the-job Seat Belt Use Policies And Programs For Its Employees When Operating Company-owned, Rented, Or Personally-owned Vehicles. The National Highway Traffic Safety Administration (nhtsa) Is Responsible For Providing Leadership And Guidance In Support Of This Presidential Initiative. For Information On How To Implement Such A Program Or For Statistics On The Potential Benefits And Cost-savings To Your Company Or Organization, Please Visit The Click It Or Ticket Seat Belt Safety Section Of Nhtsa’s Website Athttps://www.nhtsa.gov/campaign/click-it-or-ticke And Https://www.nhtsa.gov/risky-driving/seat-belts.
(end Of Clause)
far 52.212-2 - Evaluation-commercial Products And Commercial Services (nov 2021)
Section L - Notice To Offerors
1) The Government Intends To Award A Firm Fixed-price Contract To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. The Following Factors Shall Be Used To Evaluate Offers:
evaluation Factors Listed In Descending Order Of Importance:
factor 1 Technical Approach And Project Planning
factor 2 Corporate Experience And Past Performance
factor 3 Personnel Qualifications
factor 4 Price
evaluation Factors 1-3, When Combined, Are More Important Than Price.
2) A Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer’s Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award.
l.1- Technical Approach And Project Planning
the Proposed Technical Approach Shall Demonstrate The Objectives, Methods, Services, And Products Associated With Completing The Work Requirements Stated In This Solicitation. This Should Also Include An Explanation Of The Processes In Place For Monitoring The Quality Of Work And Materials Used For The Asphalt Test Surface Project.
additionally, The Offeror Shall Provide A Written Plan For The Proposed Project Schedule To Include The Anticipated Number Of Days After Contract Award To Begin Preparatory Work, Which Includes A Visit By The Project Manager/construction Supervisor To Goodfellow Air Force Base (gafb) To Obtain Approvals From Different Gafb Departments. The Offeror Shall Include The Estimated Amount Of Time For Preparatory Work, To Include, But Not Limited To; An Estimate Of Time After Security Vetting To Begin Work; An Estimate Of Time For The Placement Of A Test Strip; And An Estimate Of Time For The Placement Of The Full Test Surface And Painting Once The Mix Has Been Approved.
offerors Shall Develop The Performance Work Statement/statement Of Work (i.e. Offeror’s Solution) For Accomplishing The Objectives Of The Solicitation. Offerors Shall Develop The Performance Metrics And A Measurement Plan, And A Quality Assurance Plan For Accomplishing The Objectives Of The Solicitation.
l.2- Corporate Experience And Past Performance
the Offeror Shall Provide A List Of Past Projects That It Has Completed That Are Similar To The Project Described In This Solicitation. In Doing So, The Offeror Shall Provide:
customer Name
customer Contact Information
description Of The Project Requirements
contract Timeline And Schedule Variance
total Contract Value.
contract Number (if Federal Government Entity)
the Offeror Shall Also Provide Information On Any Contracts That Have Been Terminated For Default Or Convenience And Explain The Circumstances That Resulted In Those Decisions.
l.3- Personnel Qualifications
the Offeror Shall Provide Resumes For Personnel Proposed To Support This Project. Resumes Are Limited To 1 Page. At A Minimum, The Offeror Shall Provide Resumes For The Management Team, Project Manager, Project Engineer, And Construction Supervisor (or Similar Categories). The Resumes Shall Discuss Personnel Experience Related To Performing The Following Work:
asphalt Mix Design;
construction Of Traction Test Surfaces In General;
utqg Traction Test Surfaces Specifically; And
construction On Gafb Or Experience With Work On Military Bases.
l.4- Price/cost Proposal
the Price/cost Proposal Shall Be Inclusive Of All Prices/costs Necessary To Complete All Aspects Of The Statement Of Work.
**note**
a Site Visit To The Satf May Be Required After Contract Award For Afb Coordination Purposes. Site Visits Will Be Made Through Appointment Only With The Facility Manager/cor And The Contracting Officer.
Section M - Evlaution Factors For Award
m.1 Technical Approach And Project Planning (see L.1 For Instructions)
offerors Will Be Evaluated To Determine The Reasonableness, Completeness, Clarity, And Feasibility Of Their Approach To Carrying Out The Work Described In The Solicitation Regarding:
meeting The Required Traction Coefficient Target;
meeting The Test Surface Durability Requirements;
constructing The Surface To Meet The Ride And Smoothness Requirements;
executing A Quality Assurance/quality Control Program To Ensure The Surface Meets All Of The Requirements In The Statement Of Work; And
plan And Execute The Project Schedule.
m.2 Corporate Experience And Past Performance (see L.2 For Instructions)
offerors Will Be Evaluated To Determine:
the Ability Of The Offeror To Complete Projects Of Similar Technical Complexity.
the Offeror’s Ability To Meet Project Schedules, Milestones, And Deliverables.
the Ability Offeror To Complete Work On An Us Air Force Base.
in Addition, The Amount Of Experience Conducting Similar Work Will Be Considered.
m.3 Personnel Qualifications (see L.3 For Instructions)
offerors Will Be Evaluated On The Experience And Abilities Of The Proposed Professional And Technical Personnel. Offerors Will Be Evaluated On The Sufficiency Of The Experience And Technical Background Of The Proposed Staff To Ensure The Successful Completion Of Project.
m.4 Cost Evaluation Calculation
the Cost Proposal Will Be Evaluated For Reasonableness. Reasonableness Determinations May Be Made By Comparing Proposed Prices With The Independent Government Cost Estimate (igce), And By Comparing Proposed Prices With Prices Obtained Through Market Research For The Same Or Similar Items And Services.
for The Purpose Of Evaluating The Estimated Total Cost Proposed By Each Offeror, And For Establishing The Ceiling Amounts Of This Contract, Offerors Shall Complete Section (v) Contract Price, B.1 And Provide Supporting Documentation For All Proposed Costs.
m.4.1 Price Realism
offerors Are Placed On Notice That Any Proposal That Is Unrealistic In Terms Of Technical Commitment Or Unrealistically Low In Cost And/or Price Will Be Deemed Reflective Of An Inherent Lack Of Technical Competence Or Indicative Of Failure To Comprehend The Complexity And Risk Of Contract Requirements, And May Be Grounds For Rejection Of The Proposal.
m.4.2 Price Reasonableness
reasonableness Determinations Will Be Made By Comparing Proposed Prices Received In Response To The Solicitation, By Comparing Proposed Prices With The Independent Government Cost Estimate (igce), By Comparing Proposed Prices To Historical Prices Paid, And By Comparing Proposed Prices With Prices Obtained Through Market Research For The Same Or Similar Items.
far 52.212-3 -- Offeror Representations And Certifications-commercial Items (may 2024) (incorporated By Reference)
far 52.212-4 -- Contract Terms And Conditions-commercial Products And Commercial Services (nov 2023) (incorporated By Reference)
far 52.212-5 - Contract Terms And Conditions Required To Implement Statues Or Executive Orders-commercial Items (nov 2024) (by Reference)
special Contract Clauses And Provisions
the Successful Offeror Will Need To Provide The Following To Good Fellow Base Personnel: (provide Names, Dl #, Last 4 Of Ssn, Etc. At Least 4 Weeks Prior To Entry For Background Checks); See Specific Base Guidance Below To Make The Entry Process As Quick As Possible:
contact The Law Enforcement Desk ((325) 654-3504 Or 3505), To Let Them Know The Trucks Are On Their Way. That Way The Desk Can Contact The Inspection Facility To Let Them Know To Be On The Lookout For The Trucks.
(xiv) Defense Priorities And Allocations System (dpas)
not Applicable
(xv) Date, Time And Place Offers Are Due:
all Proposals Are Due On 4:00p.m. Est, January 13, 2025.
submit Proposals By Email To:
nhtsaoam@dot.gov, And Cc: Thomas.bub@dot.gov
the Subject Line Must Reference Rfp Number 693jj925r000012
attention: Thomas J. Bub
(xvi) Additional Information:
an Hour Long (i.e. 1 - Hour) Pre-proposal Conference Will Be Held On Thursday, December 19th, 2024 At 10:00a.m. Est. All Interested Potential Offerors Must Click The Link Below In Order To Register For This Virtual Call. (see Below)
pre-proposal Conference Registration Here * Note: (link Is Only Active On Attached Pdf Document)
following The Pre-proposal Conference Nhtsa Will Post All Responses To Questions Received In The Form Of An Amendment To This Solicitation Notice For The Public. All Solicitation Questions Are Due By 4:00p.m. On December 19th, 2024 To The Following Addresses At: Nhtsaoam@dot.gov, And Cc: Thomas.bub@dot.gov.
all Correspondence Must Reference Rfp Number 693jj925r000012 In The Subject Line.
Closing Soon13 Jan 2025
Tender AmountRefer Documents
Department Of Agriculture Tender
Civil And Construction...+1Building Construction
Corrigendum : Closing Date Modified
Philippines
Details: Description Invitation To Bid For The Rebidding Of Provision Of Labor, Materials, Equipment Rental And Other Incidentals Needed For The Construction Of Livestock Housing Facility (beef Cattle) In Region 1 1. The Department Of Agriculture - Regional Field Office 1 (da-rfo 1), Through The National Expenditure Program Fy 2025 Intends To Apply The Sum Of One Million Pesos (php1,000,000.00) Being The Approved Budget For The Contract (abc) To Payment Under The Contract For The Rebidding Of Provision Of Labor, Materials, Equipment Rental And Other Incidentals Needed For The Construction Of Livestock Housing Facility (beef Cattle) In Region 1 With Project Identification Number Da Rfo-1-2025-infra-001-r. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Da-rfo 1 Now Invites Bids For The Early Procurement Activity (epa) Of The Above Procurement Project, In Accordance With The Provisions Under Appendix 31 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184 For The Above-mentioned Procurement Project With The Following Details And Specifications, To Wit: Details And Specifications Project Site/location: Brgy. Calunetan, Sison, Pangasinan Project Description: Construction Of 135 Sq.m. Cattle House With Loafing Area, Feeding Through, Chute And Perimeter Fence Scope Of Work: Description Qty Unit I. General Requirements (permits & Project Billboard) 1.00 Lot Ii. Mobilization And Demobilization 1.00 Lot Iii. Safety And Health 1.00 Lot Iv. Earthworks 37.00 Cu.m. V. Rsb Works 1,163.00 Kgs. Vi. Form Works And Scaffoldings 600.00 Bd.ft. Vii. Concrete Works (class A) 30.00 Cu.m. Viii. Masonry Works (including Plastering) 28.00 Sq.m. Ix. Steel Works 1.00 Lot X. Tinsmithry Works 186.00 Sq.m. Xi. Painting Works 1.00 Lot Xii. Electrical Works 1.00 Lot Minimum Technical Personnel Required: • 1 Project Engineer • 1 Foreman • 6 Skilled Workers • 8 Unskilled Workers Minimum Equipment Required: • 1 One-bagger Mixer • Minor Tools Completion Of The Works Is Within Seventy (70) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Seventy-five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Prospective Bidders May Obtain Further Information From And Inspect The Bidding Documents At The Address Given Below During Office Hours At 8:00 Am To 5:00 Pm, Monday To Friday. Department Of Agriculture - Regional Field Office 1 Aguila Rd., Sevilla, City Of San Fernando, La Union 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From December 13, 2024 To January 7, 2025 From The Address Given And Websites Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php1,000.00. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. 6. The Da-rfo 1 Will Hold A Pre-bid Conference On 20 December 2024, 3:00 Pm At Da-rfo 1, 5th Floor Conference Room, Aguila Road, Sevilla, City Of San Fernando, La Union, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Above On Or Before 07 January 2025, 2:00 Pm. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On 07 January 2025, 2:00 Pm At Da-rfo 1, 5th Floor Conference Room, Aguila Road, Sevilla, City Of San Fernando, La Union. Bids Will Be Opened In The Presence Of The Bidders Or Their Authorized Representatives. 10. Additional Instructions To Bidders: A. The Bidders Or Their Duly Authorized Representatives May Attend The Bid Opening; B. In Case A Representative Will Be Attending The Bid Opening, A Special Power Of Attorney (spa), Secretary’s Certificate, Board Resolution Or Any Other Forms Of Authorization (notarized), As The Case May Be, Together With The Company-issued Identification Card Or Any Valid Id Must Be Presented Upon Submission Of The Bid Proposal At The Bac Secretariat. The Name/title Of The Project Must Be Indicated In The Authorization Or Spa; C. Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. Bidders Shall Submit Their Bids With Proper Index Tabbing Using The Forms Specified In The Bidding Documents In Two (2) Separate Sealed Bid Envelopes, And Which Shall Be Submitted Simultaneously; The First Component Which Is The Technical Eligibility Requirements Must Be Soft-bound, Marked With The Name Of The Contract And Its Ib No., Name And Address Of The Bidder, And Enclosed In An Envelope, Sealed With Signature And Marked With The Name Of The Contract, Name And Address Of The Bidder, Addressed To The Bids And Awards Committee (bac) Da Rfo-1 City Of San Fernando, La Union, The Specific Identification No. And The Warning “do Not Open Before…” The Date And Time For The Bid Opening. The Second Component Being The Financial Requirements May Be Soft-bound/fastened In A Folder, Marked With The Name Of The Contract And Its Ib No., Name And Address Of The Bidder, And Enclosed In An Envelope, Sealed With Signature And Marked With The Name Of The Contract, Name And Address Of The Bidder, Addressed To The Bids And Awards Committee (bac) Da Rfo-1 City Of San Fernando, La Union, The Specific Identification No. And The Warning “do Not Open Before…” The Date And Time For The Bid Opening. The Technical And Financial Requirement Each In Separate Envelopes, Shall Be Enclosed In A Mother Envelope With The Same Sealing And Markings. Non-compliance With Index Tabbings Shall Not Be A Ground For Outright Disqualification Or Declaration Of Ineligibility. The Improper Index Tabbings Must Be Duly Acknowledged By The Bidder/representative And Be Subject To The Bid Evaluation And Post-qualification Of The Technical Working Group (twg) As To Their Substance. D. All Documents In The Financial Requirements Envelope Must Be Duly Signed And/or Initialed, As Needed, By The Bidder/authorized Representative On Each And Every Page Thereof. E. The Award Of Contract For Procurement Projects Undertaken Through Epa May Be Made Only Upon The Following Conditions And Shall Be In Accordance With Item 7 Of Appendix 31 Of The 2016 Revised Irr Of Ra 9184: E.1. Approval And Effectivity Of The Funding Sources, To Wit: (i) General Appropriations Act; (ii) Corporate Budget; (iii) Appropriations Ordinance; Or (iv) Loan Agreement In The Case Of Faps; Or E.2. The Reenactment Of The Previous Year’s Budget Which Constitutes The Current Year’s Authorized Budget, When Authorized By The Constitution, Law Or Rules. 11. The Da-rfo 1 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And Section 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Dennis I. Tactac, Abe Chairperson, Bids And Awards Committee Department Of Agriculture - Regional Field Office 1 Aguila Road, Sevilla, City Of San Fernando, La Union Tel. No.:(072) 242/1045-46, Ext. 07 E-mail Add: Bacsec@ilocos.da.gov.ph 13. For Downloading Of Bidding Documents, You May Visit The Following Websites: Da-rfo1 Website: Https://ilocos.da.gov.ph/ Philgeps Website: Https://www.philgeps.gov.ph/ December 12, 2024 Approved By: (sgd.) Gilbert D. Rabara, Dvm Vice-chairperson, Bids And Awards Committee Invitation To Bid Identification No. Da-rfo 1-2025-infra-001-r
Closing Date21 Jan 2025
Tender AmountPHP 1 Million (USD 17.2 K)
Pointe Coupee Parish Government Tender
Civil And Construction...+1Civil Works Others
United States
Details: Section 00 00 04 Advertisement For Bid Sealed Bids Will Be Received By The Point Coupee Parish Government, 160-a E Main St, New Roads, La 70760 On Wednesday, January 15, 2025 At 2:00 Pm From Commercial Building Contractors, And Then At Said Office Publicly Opened And Read Aloud For Construction Of The Project Described As Follows: Project Name: Pointe Coupee Parish Government – New Pointe Coupee Courthouse Storage And Oep Facility Project No. 24014 General Scope Of Project: The Project Consists Of The Construction Of A New 5,000 S.f. Pre-engineered Metal Building Containing Offices And Storage Space. The Project Also Includes Renovating An Existing Storage Building, Approximately 5400 S.f. Which Will Include Selective Demolition, Installation Of New Wire Storage Cages, Demolition And Infill Of Existing Windows, New Doors, Painting, New Mechanical System, Lighting, And A New Sbs Roof System. The Project Also Includes The Construction Of A New Parking Lot And Expansion Of A Second Parking Lot. Parking Lot A Is Approximately 13,138 S.f. Parking Lot B Is Approximately 18,500 S.f. Additionally, It Includes Repairs Of Approximately 275 S.f. Of The Courthouse Parking Lot. Miscellaneous Site Work Is Included Such As New Outdoor Benches And Light Poles In Front Of The Existing Courthouse. Additive Alternate #1 Work Includes: Full Replacement Of The South Courthouse Concrete Parking Lot, Approximately 8175 S.f. Additive Alternate #2 Work Includes: Additional 2,000 S.f. Concrete Parking To Lot B And Demolition Of Three Additional Trees. All Bids Must Be In Accordance With The Bid Documents And Any Bid Received After The Time And Date Of The Bid Opening Will Be Returned Unopened. Complete Bid Documents For This Project Are Available In Electronic Form. They May Be Obtained Without Charge And Without Deposit From Www.centralbidding.com. Printed Copies Are Not Available From The Designer, But Arrangements Can Be Made To Obtain Them Through Most Reprographic Firms. Plan Holders Are Responsible For Their Own Reproduction Costs. Questions About This Procedure Shall Be Directed To The Designer At: Mougeot Architecture, Llc Telephone: 225-767-1717 10343 Siegen Lane Building 7, Suite A Email: Amelancon@mougeotarchitecture.com Baton Rouge, La 70810 No Questions Or Pre-approvals Will Be Accepted After January 9, 2025. Bids From Only The Respective Contractors Obtaining Plans, Must Be Submitted On Bid Form Provided In The Bid Documents. Each Bid Must Be Submitted In A Sealed Envelope Bearing On The Outside The Name Of The Bidder, His/her Address, Contractors State License Number And The Name Of The Project For Which The Bid Is Submitted. If Forwarded By Mail Or Hand Delivery The Sealed Envelope Containing The Bid Must Be Enclosed In Another Envelope Addressed To The Following: Via U.s. Mail Pointe Coupee Parish Government (attn: Jeanne Hendrix) Sealed Bid: Pointe Coupee Parish Government – New Pointe Coupee Courthouse Storage And Oep Facility 160-a E Main Street, New Roads, La 70760 Via Fed Ex /ups Or Hand Delivered: 160-a E Main Street, New Roads, La 70760 (attn: Jeanne Hendrix) Sealed Bid: Pointe Coupee Parish Government – New Pointe Coupee Courthouse Storage And Oep Facility Contractor Name: _________________________________________ La State Contractor License Number: __________________________ Electronic Bids: Www.centralbidding.com Until January 15, 2025 At 2:00 Pm Bids Received After The Above Specified Date And Time Will Not Be Considered. Rs 38:2218. Evidence Of Good Faith; Countersigning To Address The Above Requirement For Electronic Bids Pointe Coupee Parish Government Will Allow Electronic Bids Submitted Via The Parish Approved On-line Bid Site To Be Submitted As Follows: A. A Copy Of The Bid Bond, Certified Check, Or Cashier's Check, Must Be Attached To Bid Document Submitted Electronically B. The Original Bid Bond Document, Certified Check, Or Cashier's Check, Must Be Received In Our Office No Later Than 48 Hours After Bid Opening Date And Time (mailing; Pointe Coupee Parish Government, 160-a East Main Street, New Roads, La 70760 – Physical; 160-a East Main Street, New Roads, Louisiana 70760) C. The Bid-bond, Certified Check, Or Cashier's Check, Envelope Must Be Clearly Labeled As A “bid Bond” With The Project Name, Vendor’s Name As It Appears On The Bid Documents And Address. All Bids Must Be Accompanied By Bid Security Equal To Five (5%) Of The Sum Of The Base Bid And All Alternates, And Must Be In The Form Of A Certified Check, Cashier’s Check, Or Bid Bond Form Made Payable To Pointe Coupee Parish Government Written By A Surety Company Licensed To Do Business In Louisiana, Signed By The Surety’s Agency Or Attorney-in-fact. Surety Must Be Listed On The Current U. S. Department Of The Treasury Financial Management Service List Of Approved Bonding Companies As Approved For An Amount Equal To Or Greater Than The Amount For Which It Obligates Itself In The Bond, Or Must Be Louisiana Domiciled Insurance Company With At Least An A – Rating In The Latest Printing Of The A. M. 2019. Best’s Key Rating Guide. If Surety Qualified By Virtue Of Its Best’s Listing, The Amount Of The Bond May Not Exceed Ten Percent Of Policyholders’ Surplus As Shown In The Latest A.m. Best’s Key Rating Guide. The Bid Bond Shall Be In Favor Of The Pointe Coupee Parish Government And Shall Be Accompanied By Appropriate Power Of Attorney. No Bid Bond Indicating An Obligations Of Less Than Five (5%) By Any Method Is Acceptable. Beginning At 2:00 Pm On January 15, 2025 Bids Will Be Downloaded. No Bids Are Accepted After 2:00 P.m. Bids May Be Submitted Electronically At Www.centralbidding.com. Once Logged In, Users Must Click On Point Coupee Parish Government To View Current Advertisement Listings. This Listing Is Titled “pointe Coupee Parish Government – New Pointe Coupee Courthouse Storage And Oep Facility”. Pointe Coupee Parish Shall Not Be Responsible If The Bidder Cannot Complete And Submit A Bid Due To Failure Or Incomplete Delivery Of The Files Submitted Via The Internet. A Non-mandatory Pre-bid Conference Will Be Held On Tuesday, January 7, 2025 - 2:00 Pm (local Time) At The Project Site (128 Court Street, New Roads, Louisiana 70760). Contractors Should Have Obtained A Set Of Plans And Specifications Prior To This Time. Contract, If Awarded, Will Be On The Basis Stated In The Instructions To Bidders. No Bid May Be Withdrawn For A Period Of 45 Days After Bid Opening Except As Provided By Law. Bidders Must Meet The Requirements Of The State Of Louisiana Contractor’s Licensing Law, R.s. 37:2151 Et Seq. Bidders Must Comply With Provisions Of R.s. 38:2212.10. The Successful Bidder Shall Be Required To Furnish A Performance And Payment Bond Written By A Company Licensed To Do Business In Louisiana, In An Amount Equal To 100% Of The Contract Amount. Surety Must Be Listed Currently On The U.s. Department Of Treasury Financial Management Service List (treasury List) As Approved For An Amount Equal To Or Greater Than The Contract Amount, Or Must Be An Insurance Company Domiciled In Louisiana Or Owned By Louisiana Residents. If Surety Is Qualified Other Than By Listing On The Policyholders’ Surplus As Shown By Surety’s Most Recent Financial Statements Filed With The Louisiana Department Of Insurance And May Not Exceed The Amount Of $500,000. However, A Louisiana Domiciled Insurance Company With At Least An A – Rating In The Latest Printing Of The A.m. Best’s Key Rating Guide Shall Not Be Subject To The $500,000 Limitation, Provided That The Contract Amount Does Not Exceed Ten Percent Of Policyholders’ Surplus As Shown In The Latest A.m. Best’s Key Rating Guide Nor Fifteen Percent Of Policyholders’ Surplus As Shown By Surety’s Most Recent Financial Statements Filed With The Louisiana Department Of Insurance. The Bond Shall Be Signed By The Surety’s Agent Or Attorney-in-fact. The Pointe Coupee Parish Government Reserves The Right To Disqualify Any Bid, Response To A Request For Qualifications, Or Request For Proposals If It Is Determined That The Submitting Business Entity Is Not In Good Standing With The Louisiana Secretary Of State Or Is Not Authorized To Do Business In The State Of Louisiana. Pointe Coupee Parish Government Reserves The Right To Reject Any And All Bids For Just Cause. Major Thibaut, Parish President Pointe Coupee Parish Government Legal Ad To Run: Pc Banner - Please Publish 12/12/24, 12/19/24, 12/26/24
Closing Date15 Jan 2025
Tender AmountRefer Documents
DEPT OF THE ARMY USA Tender
Civil And Construction...+2Others, Civil Works Others
United States
Details: Amendment 0001 And Associated Attachments Are Posted To Sam.gov. Reminder That This Amendment Must Be Acknowledged And Submitted With An Offer.
****************************************************************
the Solicitation Is Restricted To Small Businesses.
project Description:
the Contractor Shall Provide Material And Labor In Order To Complete Required Work To Modernize Fr Powerhouse Elevator Located At Fort Randall Powerhouse Structure. The Work Shall Include, But Is Not Limited To, Replacement Of All Mechanical And Electrical Components Inside The Elevator Machinery Room And Installation Of A New Hvac Unit Inside The Elevator Machinery Room. The Contractor Will Be Required To Remove The Existing Elevator Mechanical And Electrical Equipment Which May Contain Hazardous Materials Such As Asbestos And Lead-based Paint.
the Contractor Will Be Required To Commence Work Upon Receipt Of Contract Award And Complete The Work 365 Calendar Days After Receipt Of Notice To Proceed, This Is Subject To Change After Solicitation Issuance.
site Visit: A Site Visit Will Be Scheduled And Additional Information Regarding The Site Visit Is Provided In The Solicitation Via Far Clause 52.236-27. The Site Visit Is Scheduled For 11am On 12 December 2024.
estimated Construction Costs:
the Estimated Construction Cost Of This Project Is Between $1,000,000 To $5,000,000.
naics Code:
the Primary North American Industry Classification System (naics) Code Anticipated For Solicitation Is 238290, Other Building Equipment Contractors, With A Size Standard For Small Business Of $22m.
obtaining Solicitation Documents:
solicitation Documents Will Be Posted To The Web Via Sam.gov. Find Solicitation Announcement In Sam.gov. 1. Use The ‘all Award Data' To Locate The Project (by Entering The Solicitation Number. 2. By Using The ‘login' Feature, It Allows Additional Search Features And Allows You To Keep Your Searches. Login Might Be Required On Some Solicitations That Are Considered Restricted. 3. Once You Have Located Your Project, Click On Link To Solicitation To View The Project. Files May Be Downloaded From The Column On The Left Side Reading ‘attachments/links’.
contracting Office Address:
usace Omaha District 1616 Capital Ave Omaha, Ne 68102-4901
point Of Contact:
allquestions Regarding This Solicitation Should Be Made To The Contract Specialist, Who Can Be Reached By Email: Brandie.l.murphy@usace.army.mil
place Of Performance:
fort Randall Dam, Pickstown, South Dakota
note: Offerors Please Be Advised That An Online Registration Requirement In System For Award Management (sam) Database Http://www.sam.gov/ Exists And Directed Solicitation Provisions Concerning Electronic Annual Representations And Certifications On Sam. Representations And Certifications Are Required To Be Updated Annually As A Minimum To Keep Information Current, Accurate And Complete. The Electronic Annual Representations And Certifications Are Effective For One Year From Date Of Submission Or Update To Sam. Solicitation Documents Will Be Posted To The Web Via Sam.gov. Registration Is Required To Access Solicitation Documents. Sam.gov Provides Secure Access To Acquisition-related Information, Synopsis Or Pre-solicitation Notices And Amendments.
Closing Date21 Jan 2025
Tender AmountRefer Documents
3361-3370 of 3455 active Tenders