Tenders of Offizielle Bezeichnung Stadtwerke Verkehrsgesellschaft Frankfurt Am Main Mbh Vgf
Tenders of Offizielle Bezeichnung Stadtwerke Verkehrsgesellschaft Frankfurt Am Main Mbh Vgf
Offizielle Bezeichnung Stadtwerke Verkehrsgesellschaft Frankfurt Am Main MbH VGF Tender
Civil And Construction...+1Others
Germany
Public tender Vob/a track renewal level crossing Ostparkstrasse Description of the overall construction project The existing tender includes the renewal of the level crossing in the area of Ostparkstrasse and Ratsweg intersection. Services to be carried out The scope of work includes the following services: - Rail dismantling - Welding work - Tamping work - Traffic safety work - Asphalt work Preliminary work carried out A condition assessment of the construction site is to be carried out by the contractor before the start of and again after completion of the construction project with the involvement of the VGF construction monitoring team and is to be documented with photos and the necessary descriptions (see also Section 3 Paragraph 4 Vob/b). The conditions of the areas before pre-assembly, loading or other work on municipal or VGF-owned land are to be documented before and after completion of the work. The documentation must be handed over to VGF before the start and after completion of the construction work. Services carried out Immediately before the construction work, the main axes are marked out by a surveying office commissioned by VGF. These documents are only handed over to the office before construction begins. The track is to be aligned and, if necessary, tamped using this data. Construction work in progress During the execution, individual employees of the company will carry out work in the area of the construction site. This includes, among other things, work on the signaling technology or the overhead line. No separate claims for remuneration arise from this. Further information and boundary conditions for the construction work in progress at the same time are defined under 3.2. Construction sequence. The work must be carried out between March 10, 2025 and March 17, 2025, as the line is closed here. The construction end date of March 17, 2025 is penalized (last day of the line closure).
Closing Date29 Jan 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Stadtwerke Verkehrsgesellschaft Frankfurt Am Main MbH VGF Tender
Others
Germany
Public tender Vob/a ventilation system NEA Hauptwache General description of the service In the rooms in component G of the Hauptwache underground station, a new emergency power system is planned on the first basement level. The ancillary and technical rooms required to operate the emergency power system are mechanically ventilated. A floor-standing central ventilation unit with a volume flow of 1,900 m3/h is used in the ventilation center specially created for this purpose. The ventilation unit is equipped with an electric reheating register for heating purposes. The outside air is supplied via a ventilation duct which leads outside through the stairwell emergency exit Gw, room Hw-gub-31. The exhaust air leads outside via the same route. The air is distributed via a duct network made of galvanized sheet steel. The air volume is allocated to each person or area using volume flow controllers or control flaps. Swirl outlets are used as air outlets in the usage units. Motorized fire dampers with spring return motors are provided to separate the individual fire compartments. To avoid condensation and thermal losses, the systems are insulated in accordance with recognized technical standards. The ventilation system is controlled by a higher-level building management system. The control cabinet with the necessary active and passive components to control the system is placed in the technical room immediately adjacent to the ventilation center. Any necessary closure of public traffic areas, etc. must be applied for in good time from the relevant authorities and departments. The necessary official permits must be obtained from the beginning of construction. When carrying out the work, the contractor is bound by the instructions of the construction management. Work by other contractors, the completion of which is a prerequisite for the performance of the services, must be checked to ensure that it is free of defects. Implementation of the service: The service lists, descriptions, drawings and plans issued are binding for the implementation of the services. The contractor draws up a schedule after consultation with the client. Before work begins, the contractor must, if necessary, submit the work documents to the client and the construction management for written confirmation or approval. The contractor must request the necessary planning documents in good time. Checks must be carried out on site with regard to the required dimensions. If deviations are discovered, these must be reported to the construction management immediately. The project planning includes the complete building services installation and assembly services. An on-site inspection before submitting an offer is recommended. Other companies are to be expected on the construction site.
Closing Date30 Jan 2025
Tender AmountRefer Documents