Tenders of Offizielle Bezeichnung Stadt Hanau, Vertreten Durch Hanau Immobilien Und Baumanagement Eigenbetrieb Der Stadt Hanau
Tenders of Offizielle Bezeichnung Stadt Hanau, Vertreten Durch Hanau Immobilien Und Baumanagement Eigenbetrieb Der Stadt Hanau
Offizielle Bezeichnung Stadt Hanau, Vertreten Durch Hanau Immobilien Und Baumanagement Eigenbetrieb Der Stadt Hanau Tender
Others
Germany
Participation competition below the European thresholds - sectors (construction work) Brothers Grimm School, extension Interior and exterior plastering work Preparation of the wall surface: approx. 2,500m² Protective covering inside / outside: 2,000m² Gypsum interior plaster (in parts lime plaster) Incl. Plaster reinforcement and accessories: approx. 900m² Reveals ... MoreInterior and exterior plastering work Preparation of the wall surface: approx. 2,500m² Protective covering inside / outside: 2,000m² Gypsum interior plaster (in parts lime plaster) Incl. Plaster reinforcement and accessories: approx. 900m² Reveals inside: approx. 500m Work on electrical parts / slots / steps / windows and doors etc.: approx. 300m Exterior plaster (plaster reinforcement / base plaster / top plaster): 850m² Combed plaster: 335m² Plaster surrounds around windows in Combed plaster: Approx. 200m² Base plaster: 100m² External reveals: Approx. 500m sample areas Leveling and paint coat External plaster / Base plaster: Approx. 950m² Documentation Applications to participate or offers must be submitted - electronically via Https://www.subreport-elvis.de/e55623893
Closing Soon6 Nov 2024
Tender AmountRefer Documents
Offizielle Bezeichnung Stadt Hanau, Vertreten Durch Hanau Immobilien Und Baumanagement Eigenbetrieb Der Stadt Hanau Tender
Civil And Construction...+2Others, Civil Works Others
Germany
Participation competition below the European thresholds - sectors (construction work) Center for Democracy and Diversity, demolition, shell construction work, underpinning measures (hdi) Underpinning measures / earthworks - excavation, hand excavation of foundations, pipe trenches, exploration approx. 60 m³ - demolition of floor slabs approx. 45 m² - jet grouting / high pressure injections: underpinning ... Additional underpinning measures / earthworks - excavation, hand excavation of foundations, pipe trenches, exploration approx. 60 m³ - demolition of floor slabs approx. 45 m² - jet grouting / high pressure injections: underpinning of existing foundations up to T = 250 cm in accordance with DIN 4093 approx. 83 m³ - additional foundations approx. 20 m³ - underground pipes Rw, Sw, shafts and accessories Support measures - extensive support measures to support the existing facade with cross beams, profile steel girders and reinforced concrete columns, Anchoring down to the building ground 3 pieces of demolition work - partial demolition of roofs including roof structure approx. 770 m² - removal of windows approx. 60 pieces - dismantling of walls Stb / Mw approx. 90 m² - dismantling of drywall approx. 670 m² - dismantling of interior doors approx. 65 pieces - dismantling of glass block walls approx. 40 m² - dismantling of floor coverings (cavity, screed, etc.) approx. 700 m² - dismantling of ceilings (various. 100 M² - Dismantling of supports including bracing measures - Wall breakthroughs/core drilling in existing walls D up to 70cm Approx. 57 M - Subsequent door/wall openings Approx. 20 pieces - Dismantling of building services, electrical, lightning protection, heating systems Masonry work - Brick walls D= 24cm Approx. 100 M³ - Brick walls D> 24cm Approx. 15 M³ - Wall connection rails Approx. 50 linear meters O Anchors (4 pieces/m) Approx. 200 pieces Concrete work - Renewal of floor slabs Approx. 45 M² - Stb. ceilings: O Ceiling slab extension north, D=12cm Approx. 300 M² O Ceilings and platforms Trh new, D=16 Approx. 100 M² - Stb. walls D=20-28cm Approx. 485 M² - Stb. supports Approx. 15 M - Stb. internal staircase, prefabricated flights, 3-8 steps each Approx. 21 m² - Stb. internal staircase, single flight Approx. 10 m² Reinforcement content - Walls 120 kg / m3; Approx. 8 tons - Columns 300 kg / m3; Approx. 3 tons - Ceilings 140 kg / m3; Approx. 11 tons - Beams, Uz / Üz 250 kg / m3; Approx. 10 tons - Foundations 200 kg / m3; Approx. 2 tons - Reinforcement rebend connections Approx. 150 m - Connection reinforcement, glued in Approx. 600 pieces - Sound decoupling stair bearings, various types Approx. 50 pieces Profile steel work - Flat roof Approx. 625 m² - Trapezoidal steel sheet Approx. 325 m² O T85.1 - 1.00 Din 18807approx. 3 tons - profile steel O roofs, walls, supports, beams, support structures approx. 45 tons O anchor plates, node sheets, straps, etc. approx. 2,000 kg O head bolts approx. 1,000 pieces O weld-on sleeves approx. 120 pieces Sealing measures - base insulation and base sealing approx. 75 m² load-bearing structure The construction measures include walls and supports and ceilings made of reinforced concrete, walls made of masonry, ceilings, walls and roofs made of profile steel supporting structures. Roofs The main roof is a flat roof made of profile steel with trapezoidal sheeting, which will later be equipped with green roofs and a photovoltaic system. The roof above the 1st floor is a concrete roof on a profile steel structure, which will later be partially designed as a walkable roof area. External walls / facade The load-bearing external walls are made of masonry. The new staircase is made of reinforced concrete. The facade will be insulated and plastered after completion of the work. Applications to participate or offers must be submitted electronically via Https://www.subreport-elvis.de/e25885854
Closing Soon8 Nov 2024
Tender AmountRefer Documents