Tenders of Offizielle Bezeichnung Butzbacher Wohnungsgesellschaft Gmbh

Tenders of Offizielle Bezeichnung Butzbacher Wohnungsgesellschaft Gmbh

Offizielle Bezeichnung Butzbacher Wohnungsgesellschaft GmbH Tender

Others
Germany
Public tender VOB/A drywall work for renovation of old cafeteria The following main and ancillary work is required in the following rooms: Ceiling of multi-purpose room and hallway, ceiling of storage rooms, ceiling of toilets, ceiling cavity above storage rooms Ceiling of multi-purpose room and ... More The following main and ancillary work is required in the following rooms: Ceiling of multi-purpose room and hallway, ceiling of storage rooms, ceiling of toilets, ceiling cavity above storage rooms Ceiling of multi-purpose room and hallway: - Produce 380 m² seamless acoustic suspended ceiling made of recycled glass material including substructure, thickness 18 mm, building material class: A2 - 85 m sliding wall connection for acoustic ceiling with shadow gap - Produce 45 m expansion joints, 15 mm wide - 710 m² covering of wall and floor surfaces with protective film including disposal Ceiling of storage rooms: - 58 m² mineral fiber ceiling, ceiling grid 62.5 x 62.5 cm, incl. Create substructure, thickness 15 mm, building material class: A2 - 62 m wall connection using L-angles - 77 m² covering of wall and floor surfaces with protective film including disposal Ceiling WCs: - 22 m² mineral fiber ceiling for damp rooms, ceiling grid 62.5 x 62.5 cm, including create substructure, thickness 15 mm, building material class: A2 - 40 m wall connection in damp rooms using L-angles - 55 m² covering of wall and floor surfaces with protective film including disposal Ceiling cavity above storage rooms: - 1 piece of bulkhead in ceiling cavity, thickness 60 mm, height 300 mm Facing shells: - 13 m² free-standing facing shell, thickness 12.5 cm, including substructure made of simple studwork and insulation layer 80 mm thick, one-sided, 2-layer planked with plasterboard - 13 m² facing shell Pre-wall installation, thickness 40 cm, including substructure made of simple studwork and insulation layer 40 mm thick, one-sided, 2-layered with plasterboard - 2 m² facing shell Pre-wall installation, thickness 30 cm, including substructure made of simple studwork and insulation layer 40 mm thick, one-sided, 2-layered with plasterboard - 2 m² facing shell Pre-wall installation, thickness 50 cm, including substructure made of simple studwork and insulation layer 40 mm thick, one-sided, 2-layered with plasterboard General: - Creation of complete documentation
Closing Date12 Dec 2024
Tender AmountRefer Documents 

Offizielle Bezeichnung Butzbacher Wohnungsgesellschaft GmbH Tender

Civil And Construction...+3Others, Consultancy Services, Civil And Architectural Services
Germany
Public tender Vob/a roof sealing work for the renovation of the old cafeteria The following main and ancillary work is required for the subsequent insulation work as part of the floor structure and work in the roof area Floor: - 485 m² Cleaning the subsurface of coarse dirt by vacuuming - 485 m² Primer for bitumen sealing using bitumen emulsion - 485 m² Sealing the floor area inside with bitumen welding sheet - 207 m Connection to rising components with cove - 4 pcs. Connection and sealing to loose fixed flange, built-in floor drain - 35 pcs. Allowance for inside and outside corners - 485 m² Checking for defects - 10 pcs. Sealing of defects in the roof space: - 345 M² of vapor barrier laid out on rough-sawn formwork - 345 M² of mineral wool Mw 0.035w/(mk) single layer, thickness 160mm laid out on vapor barrier General: - Creation of a complete documentation
Closing Date12 Dec 2024
Tender AmountRefer Documents 

Offizielle Bezeichnung Butzbacher Wohnungsgesellschaft GmbH Tender

Others
Germany
Public tender Vob/a scaffolding for conversion of former cafeteria The following types of scaffolding and ancillary work are required for plastering, drywalling and painting work: Facade scaffolding, longitudinal scaffolding, surface scaffolding: Facade scaffolding: - 610 m² construction and ... More The following types of scaffolding and ancillary work are required for plastering, drywalling and painting work: Facade scaffolding, longitudinal scaffolding, surface scaffolding: Facade scaffolding: - 610 m² construction and dismantling of a working scaffold as a standing scaffold. Facade scaffolding on the outside of the building, including basic operating time (4 weeks), load class 3, width class Sw06, height class H1, including anchoring plan, anchoring protocol, stat. Calculation - Transfer of use of the upper level scaffolding for 4 weeks - 112 m assembly and dismantling of the flooring widening on the wall side - Transfer of use of the upper level scaffolding for 4 weeks - 2.64 m additional side protection on one scaffold level - 2 x assembly and dismantling of additional ladder flights - Transfer of use of the additional ladder flights for 4 weeks - 10 m² conversion of the free-standing scaffold on all 2 scaffold levels - 15 m² laying of load-distributing wooden flooring on the inside of the longitudinal scaffolding (movement space): - 120 m² erection and dismantling of a working scaffold as a free-standing scaffold. Facade scaffolding on the inside of the building, including basic operating time (4 weeks), load class 3, width class Sw06, height class H1, static calculation - 6 x assembly and dismantling of the bridging, made of system lattice girders, in the scaffolding incl. Basic deployment time (4 weeks), span up to 5m, footprint up to 4m - 34 m² Moving a section of the above-mentioned working scaffolding as a free-standing scaffold, facade scaffolding on the building's interior surfaces, from movement space for the lock room - 41 m² Moving a section of the working scaffolding as a free-standing scaffold, facade scaffolding on the building's interior surfaces, from movement space for the warehouse room 2 - 22 m² Moving a section of the working scaffolding as a free-standing scaffold, facade scaffolding on the building's interior surfaces, from movement space for the warehouse room 1 - 28 m² Moving a section of the working scaffolding as a free-standing scaffold, facade scaffolding on the building's interior surfaces, from movement space for the main area scaffolding (movement space) - 825 m³ Erecting and dismantling a working scaffolding as a free-standing scaffold, area-oriented on the building's interior surfaces, incl. Basic operating time (4 weeks), load class 3, height class H2, with vertical side protection, length of scaffolding component 22.50 m, width of scaffolding 15.25 m, height of scaffolding 3 m - Use of the above-mentioned scaffolding for 4 weeks - 180 m of floor areas inside to be protected with milk carton paper - 110 m of floor areas outside to be protected with painter's fleece
Closing Date12 Dec 2024
Tender AmountRefer Documents