Office Furniture Tenders

Office Furniture Tenders

DEPT OF THE ARMY USA Tender

Civil And Construction...+2Others, Building Construction
United States
Details: Rfp No: W912dw25r0015 rfp Title: P97462 Supply Storage Activity Warehouse, Joint Base Lewis Mccord (jblm), Wa, Joint Base Lewis-mccord, Washington rfp Posted Date: On Or About 13 January 2025 offeror Response Due Date: On Or About 12 Febuary 2025 magnitude Of Construction: Is Between $25,000,000 And $100,000,000. psc Code: Y1jz Construction Of Miscellaneous Buildings naics Code: 236220 Commercial And Industrial Building Construction classification Code: Y - Construction Of Structures And Facilities set Aside: 8 (a) Set-aside ================================================================ for Information Only: This Synopsis Is Only A Notification A Request For Proposal (rfp) Is Anticipated And Forthcoming. All Questions Regarding This Synopsis Should Be Submitted In Writing Via Email To The Contract Specialist As Noted Below. the United States Army Corps Of Engineers (usace) Seattle District Anticipates Solicitation And Award Of A Firm-fixed Price Contract Resulting From Rfp W912dw25r0015. This Requirement Is A Design-build Project To Design And Construct A Supply Storage Activity Warehouse At Joint Base Lewis-mccord, Washington. the Request For Proposal (rfp) Will Be Available To All Business Firms With An Active Sam Registration. The North American Industry Classification System (naics) Code Is 236220 Commercial And Industrial Building Construction With A $45m Size Standard. in Accordance With Department Of Defense Federal Acquisition Regulation Supplement (dfars) 236.204, The Estimated Magnitude Of Construction Is Between $25,000,000 And $100,000,000. 100 Percent (%) Payment And Performance Bonds Will Be Required. project Description: project Consists Of Construction Of A New One-story 21,500 Sf Supply Storage Warehousebuilding, Two Stand-alone Canopies, Hardstand Areas, Paved Drives, And Parking Areas, Newlylandscaped Areas, Fencing, And Associated Walks, Site Drainage And All Associated Utilities On An Approximate 7-acre Site Of Lewis-main. (jblm) the Contractor Shall Furnish Separate Space For The Exclusive Use Of The Government. The Officespace Shall Include Approximately 700 Square Feet For The Exclusive Use Of The Government(minimum Two Offices, One Conference Room, One Restroom, And One Kitchenette Area) Withpower, Water, Appropriate Office Furniture, Heat And Air-conditioning, And Perform Any Necessary Maintenance. Each Office Shall Have A Minimum Of One Window With Operable Window Blinds. Electrical And Communications Outlets Shall Be Provided For Each Office Area And The Conferenceroom. Each Single Occupancy Office Area Shall Be Furnished With One 3-foot By 5-foot Desk Andone 3-foot By 5-foot Plans Table. The Desks Shall Each Have Side Drawers And A Lockable Centerdrawer, For A Minimum Of Five Drawers. The Plans Tables Shall Each Have One Central Drawer.each Double Occupancy Office Area Shall Be Furnished With Two Desks And Two Plans Tables Of The Same Type As The Single Occupancy Office Areas. Provide One Five-wheeled, Padded, Ergonomic Desk Chair For Each Desk. Each Single Office Shall Have A Four-legged, Padded "guest Chair" Similar To The Ergonomic Swivel Chairs And Roller Mat. Double Occupancy Offices Shall Have Two Four-legged, Padded "guest Chairs" Similar To The Ergonomic Swivel Chairs And Roller Mat. Each Single Office Area Shall Be Furnished With A 12-inch By 18-inch By 6-foot Metal Locker With A Shelf, Coat Hanger Rod, And Three Clothes Hooks. Double Occupancy Offices Shall Have Two 12-inch By 18-inch By 6-foot Metal Lockers With A Shelf, Coat Hanger Rod, And Three Clothes Hooks. Provide One Minimum 3-foot By 4-foot Whiteboard For Each Single Occupancy Office And Two Minimum 3-foot By 4-foot Whiteboards In Each Double Occupancy Office. Provide Two Mobile Plan Stands With Twelve Hanging Clamps Each. The Conference Room Shall Be Furnished With A 3.5-foot By 8-foot Conference Table, Six Padded Chairs Similar To The Ergonomic Swivel Chair And One 4-foot By 8-foot Whiteboard. Provide One Walk-off Mat At Each Building Entrance. Provide Two Ten-pound, Multi-purpose, Dry Chemical Fire. offerors: Please Be Advised Of On-line Registration Requirement In The System For Award Management (sam) Database Http://www.sam.gov/ And Directed Solicitation Provisions Concerning Electronic Annual On-line Representations And Certifications. Representations And Certifications Are Required To Be Updated Annually As A Minimum To Keep Information Current, Accurate And Complete. on Or About, 13 Jan 2025, [nsfcuc(1]the Rfp Documents For This Project Will Be Available Via The Website Https://sam.gov/ Under Contract Opportunities W912dw25r0015. Your Firm Must Be Registered With Https://sam.gov/ To Download The Rfp Documents. No Cd’s Or Hard Copies Will Be Made Available. Downloads Are Available Only Through Https://sam.gov/. Offerors Are Responsible For Checking Https://sam.gov/ Frequently For Any Update(s) To This Notice. The Government Is Not Responsible For Any Loss Of Internet Connectivity Or For An Offeror’s Inability To Access The Document(s) At The Referenced Website. To Obtain Automatic Notifications Of Updates To This Rfp, You Must Log In To Https://sam.gov/ And Add The Rfp To Your “watchlist.” If You Would Like To List Your Firm So Others Can See You Are An Interested Vendor, You Must Click The “add Me To Interested Vendors” Button In The Listing For This Rfp. Your Firm’s Proposal Shall Be Submitted Electronically Through The Procurement Integrated Enterprise Environment (piee) Solicitation Module At Https://piee.eb.mil/. to View The Rfp When Posted, Vendors Must Have An Active Registration In Sam.gov. for Piee Registration, Training, And Instructions For Posting An Offer, Refer To The Following Links: piee Registration: Https://piee.eb.mil/ note: There Are Two Vendor Roles (proposal Manager, Proposal View Only) For Piee Solicitation Module. The Proposal Manager Role Is Required To Submit An Offer To A Solicitation. Please Be Advised That When Using The Piee Solicitation Module, The User’s Email Address In Piee Must Match The Email Address On File In Sam.gov. piee Solicitation Module: training And Instructions Are Accessible Through Piee – Web Based Training (wbt) At Https://pieetraining.eb.mil/wbt/ (for Instructions Specific To Posting An Offer, Select; Solicitation Module è Proposals (offers) è Posting Offer) for Frequently Asked Questions (faqs) And Additional Training, Go To The Dod Procurement Toolbox – Solicitation Module At Https://dodprocurementtoolbox.com/site-pages/solicitation-module point-of-contact: the Point-of-contact For Administrative Or Contractual Questions Is Linda O’brien At Email: Linda.s.obrien@usace.army.mil. Once The Rfp Has Been Issued, All Questions Must Be Submitted In Accordance With The Rfp Instructions. [nsfcuc(1]i Think The Date Is About Right But Can We Maybe Push It Back To April 17? That Way If The Peer Review Comes Back Early Ready To Issue, Then We Don't Have To Sit Around Waiting.
Closing Date13 Feb 2025
Tender AmountRefer Documents 

Employment And Social Development Canada Tender

Canada
Details: This Amendment Is Raised To Make Changes To Mtc 1 Of The Evaluation Criteria And Make Changes To The Rfsa Name From Esdc National Cabling, Dismantling, Installation And Staging Services (cdiss) - Request For Supply Arrangement (rfsa) To Esdc National Cabling, Dismantling, Installation, Staging And Repair Services (cdisrs) - Request For Supply Arrangement (rfsa). ********************************************************************************* Employment And Social Development Canada (esdc) Is Seeking To Create A Supply Arrangement (sa) Purchasing Tool For Prequalifying Vendors, Contractors And Professionals Across Canada For Services Including Installation, Dismantling, Moving And Packaging Of Office Furniture, Equipment, And Cabling Of Workstations And Collaborative Areas. Once Established, This Sa Will Be Used By Esdc’s Real Property Teams Across All Provinces, Territories And Regions Of Canada To Procure Services For Our Service Canada Centres, Passport Canada Offices And Back End Esdc General Office Spaces. These Services Are Being Sought Through A Supply Arrangement Which Will Start April 1, 2024, And Expire When Esdc Determines That It Is No Longer Advantageous. A Request For Supply Arrangements (rfsa) Will Be Issued In Accordance With The Process Set Out Below To Allow New Suppliers To Become Qualified. Existing Qualified Suppliers, Who Have Been Issued A Supply Arrangement, Will Not Be Required To Submit A New Arrangement. The Initial Notice (100024501/a) Was Posted On November 20, 2023 In Order To Begin The Qualification Process For Bidders Who Have Submitted Arrangements For The Initial Notice. This Notice (100024501/b) Will Be Left Continuously Posted On The Government Electronic Tendering Service (gets) To Allow New Suppliers To Become Qualified. Qualified Vendors Will Be Added To The Supply Arrangement, As They Have Been Deemed To Qualify. This Supply Arrangement Will Have A Total Of Four Work Streams, Which Bidders May Indicate Their Interest/capability In: 4.1 Stream One: Furniture Assembly And Moving Services The Sa Holder Must Carry Out Services Including: 1. Removing Assembled Furniture Items Or Disassembled Furniture Item Parts From Packaging And/or Pallets; 2. Assembling Furniture Items According To Manufacturer Instructions And/or Guidelines; 3. Moving Furniture Items By Hand, Or Using Tools, Either Assembled Or In Parts To Designated Areas; 4. Placing Furniture Items According To Provided Floor Plans And Client Authority Directions; 5. Leaving With All Packaging Waste Produced And Disposing Of It In An Ecologically Respectful Manner; 6. Leaving Job Sites In A “clean And Ready To Be Used” State; 7. Prepare A Report Of All Damaged, Broken Or Non-functional Furniture Items. 8. The Sa Holder Must Not Unpackage, Assemble Or Move Items That Were Not Identified In The Work Order, Unless Advised Otherwise By The Project Authority. 9. Where Elevators Are To Be Used For Moving Items Or Equipment, The Elevator Cab Must Be Lined And Properly Protected. 10. Doors And Door Openings Must Be Protected From Potential Damage, When Applicable. When Necessary, The Contractor Must Remove Doors From The Frames And Reinstall Without Damage At The End Of The Services. 4.2 Stream Two: Furniture Dismantling And Packaging Services The Sa Holder Must Carry Out Services Including: 1. Dismantling And Disassembling Furniture Items, Without Damaging Them, According To Manufacturer Instructions And Guidelines; 2. Sort And Place Furniture Items And Parts By Types And Sizes When Dismantling Entire Floor Areas; 3. Supply Crates, Skids, Wrap Shrink, Labels, Etc. For Packaging. 4. Labelling And Packaging And Or Crating Assembled Furniture Items For Transport On Skids For Transport; 5. Labelling And Packaging And Or Crating Furniture Item Parts On Skids For Transport; 6. Transport Furniture Items And Furniture Parts To Storage Areas According To Provided Floor Plans And Client Authority Directions; 7. Leaving With All Excess Packaging Waste Produced And Disposing Of It In An Ecologically Respectful Manner; 8. Leaving Job Site In A Clean State. 9. Prepare A Report Of Any Damaged, Broken Or Non-functional Furniture Items. 10. The Sa Holder Must Not Dismantle, Package, Move Or Store Items That Were Not Identified In The Work Order, Unless Advised Otherwise By The Project Authority. 11. Where Elevators Are To Be Used For Moving Items Or Equipment, The Elevator Cab Must Be Lined And Properly Protected. 12. Doors And Door Openings Must Be Protected From Potential Damage, When Applicable. When Necessary, The Contractor Must Remove Doors From The Frames And Reinstall Without Damage At The End Of The Services. 4.3 Stream Three: Office Equipment Cabling, Connecting, Disconnecting And Installing Services The Sa Holder Must Carry Out Services Including: 1. Preparing Workstations And Removing Cabling For Workstations 1. Pull And Run Existing Power And Data Cables For Connectivity As Needed For Specified Site Work. 2. Cable Management And Coiling To Ceiling As Required At Sites For Specified Work. 3. Disconnect, Wrap And/or Remove Existing Data Cables As Needed For Specified Site Work. 4. Label Cables To Identify Associated Equipment. 2. Unpacking Office Equipment And Removing All Packaging In Preparation For Installation 3. Assembling And Installing Office Equipment On Workstations Including: 1. Monitor Arms; 2. Cable Trays; 3. Work Surface Mounted Power/usb Modules; 4. Mounting And Unmounting Monitors On Monitor Arms; 5. Connecting And Disconnecting Workstation Equipment Including: 1. Laptop Docking Stations To Monitors; 2. Monitors And Laptop Docking Stations To Power Bar; 3. Work Surface Mounted Power Socket And Usb Hub To Power Bar; 4. Power Bars To Panel Or Wall Mounted Power Outlet; 5. When Disconnecting, Removal And Wrapping Or Bundling Of All Cables; 6. When Disconnecting, Identifying All Cables To The Equipment They Were Connected To; 7. Remove, Wrap And Bundle Unused Cables; 8. Power Bars And Power Modules Must Not Be ‘dasiy Chained’ Or Connected To Each Other In Sequence. 6. Organizing Cables And Wiring To Ensure Workstations Have An Adequate Cable Management Setup By: 1. Passing Monitor Cables Trough Monitor Mount Dedicated Wire Channels And Grommet Holes When Possible; 2. Passing Docking Station Cables Either Through Grommet Holes Or Over The Work Surface Edge; 3. Passing Work Surface Power Outlet Cables Either Through Grommet Holes Or Over The Work Surface Edge; 4. Placing Power Bars And All Extra Cable Length In The Cable Tray; Bundling And Securing Them In Place With Cable Managers, Such As Velcro Straps, Or When No Cable Trays Are Provided, Attach All Extra Cable Length With Cable Managers To Work Station And Ensure No Cabling Obstructs Access To Workstation Or Drops Into Leg Space Under Work Station, 1. For Height Adjustable Workstations, Cables Must Have Enough Free Length To Accommodate The Minimum And Maximum Height Adjustments; 7. Testing Basic Functionality Of Office Equipment; 1. Checking And Adjusting Movement Range And Support Capacity Of Monitor Arms; 2. Turning On Monitor Screens To Verify That They Receive Power; 3. Verifying That Power Sockets And Usb Sockets Of Work Surface Mounted Power Outlet Are Receiving And Transmitting Power; 4. Verify That Laptop Docking Station Indicator Light Is On And That Connecting A Device To The Usb-c Dongle Transmits Images To The Screens And Powers The Device; 5. Prepare A Report Of Any Damaged, Broken Or Non-functional Equipment; 6. Leaving Job Sites In Clean State, And In The Case Of Installation, Site Must Be Ready For Use By Client; 7. Leaving With All Excess Packaging Waste Produced And Disposing Of It In An Ecologically Respectful Manner. 8. The Sa Holder Must Not Install, Mount, Connect Or Test Items That Were Not Identified In The Work Order, Unless Advised Otherwise By The Project Authority. 4.4 Stream Four: Repair Services The Sa Holder Must Carry Out Services Including But Not Limited To: 1. Identify Any Required Repairs During Moves And/or Installations A. Assess Associated Costs B. Provide Detailed Report 2. Vendor May Be Provided A List Of Already Identified Repairs A. Vendor To Provide A Detailed Quote 3. Vendor May Be Required To Assess Scope Of Potential Repairs To Furniture Or Office Equipment. A. Repairs Include The Following But Not Limited To Items Listed In Definitions - 3.1 I. Furniture - 3.1.1 Ii. Office Equipment – 3.1.2 B. Vendor To Provide A Report Including A Detailed Quote 4. All Repairs Will Follow All Possible Safety Precautions 5. All Repair Quotes Will Include A Start Date And An Approximate Completion Timeframe A. Should Work Exceed Original Established Parameters, Vendor To Provide Additional Quote Prior To Continuing. 6. Prepare A Report Detailing The Completed Repairs, Including Any Outstanding Work That Couldn’t Be Completed (and Reasons Why). 7. Leaving Job Sites In A “clean And Ready To Be Used” State; 8. Leaving With All Packaging Waste Produced And Disposing Of It In An Ecologically Respectful Manner; This Sa Will Also Be Broken Down Into 25 Zones Across Canada, Which Vendors Will Be Asked To Indicate Which Zones That They Are Capable/willing To Offer Services In: Zone # Zone Name 1 Upper Bc 2 Central Bc 3 Lower Bc 4 Upper Ab 5 Lower Ab 6 Upper Sk 7 Lower Sk 8 Upper Mb 9 West Mb 10 East Mb 11 West On 12 Upper On 13 East On 14 Central On 15 Lower On 16 Greater Quebec 17 Montreal 18 Quebec City 19 New Brunswick 20 Nova Scotia 21 P.e.i 22 Labrador 23 Island Of Newfoundland 24 Yukon 25 Nwt
Closing Date27 Dec 2033
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+1Civil Works Others
United States
Details: 5. Project Number (if Applicable) code 7. Administered By 2. Amendment/modification Number code 6. Issued By 8. Name And Address Of Contractor 4. Requisition/purchase Req. Number 3. Effective Date 9a. Amendment Of Solicitation Number 9b. Dated page Of Pages 10a. Modification Of Contract/order Number 10b. Dated bpa No. 1. Contract Id Code facility Code code offers Must Acknowledge Receipt Of This Amendment Prior To The Hour And Date Specified In The Solicitation Or As Amended, By One Of The Following Methods: the Above Numbered Solicitation Is Amended As Set Forth In Item 14. The Hour And Date Specified For Receipt Of Offers e. Important: is Extended, (a) By Completing Items 8 And 15, And Returning __________ Copies Of The Amendment; (b) By Acknowledging Receipt Of This Amendment On Each Copy Of The offer Submitted; Or (c) By Separate Letter Or Electronic Communication Which Includes A Reference To The Solicitation And Amendment Numbers. Failure Of Your acknowledgment To Be Received At The Place Designated For The Receipt Of Offers Prior To The Hour And Date Specified May is Not Extended. 12. Accounting And Appropriation Data (rev. 11/2016) is Required To Sign This Document And Return ___________ Copies To The Issuing Office. is Not, a. This Change Order Is Issued Pursuant To: (specify Authority) The Changes Set Forth In Item 14 Are Made In The Contract Order No. In Item 10a. 15c. Date Signed b. The Above Numbered Contract/order Is Modified To Reflect The Administrative Changes set Forth In Item 14, Pursuant To The Authority Of Far 43.103(b). result In Rejection Of Your Offer. If By Virtue Of This Amendment You Desire To Change An Offer Already Submitted, Such Change May Be Made By Letter or Electronic Communication, Provided Each Letter Or Electronic Communication Makes Reference To The Solicitation And This Amendment, And Is Received Prior To the Opening Hour And Date Specified. c. This Supplemental Agreement Is Entered Into Pursuant To Authority Of: d. Other contractor 16c. Date Signed 14. Description Of Amendment/modification 16b. United States Of America except As Provided Herein, All Terms And Conditions Of The Document Referenced In Item 9a Or 10a, As Heretofore Changed, Remains Unchanged And In Full Force And Effect. 15a. Name And Title Of Signer 16a. Name And Title Of Contracting Officer 15b. Contractor/offeror standard Form 30 previous Edition Not Usable prescribed By Gsa - Far (48 Cfr) 53.243 (type Or Print) (type Or Print) (organized By Ucf Section Headings, Including Solicitation/contract Subject Matter Where Feasible.) (number, Street, County, State And Zip Code) (if Other Than Item 6) (specify Type Of Modification And Authority) (such As Changes In Paying Office, Appropriation Date, Etc.) (if Required) (see Item 11) (see Item 13) (x) check one 13. This Item Applies Only To Modifications Of Contracts/orders, it Modifies The Contract/order No. As Described In Item 14. 11. This Item Only Applies To Amendments Of Solicitations amendment Of Solicitation/modification Of Contract (signature Of Person Authorized To Sign) (signature Of Contracting Officer) 1 5 0001 01-02-2025 544-25-2-4075-0004 none 36c247 department Of Veterans Affairs visn 7 Network Contracting Activity central Alabama Healthcare System 215 Perry Hill Road montgomery Al 36109 36c247 department Of Veterans Affairs visn 7 Network Contracting Activity 215 Perry Hill Road montgomery Al 36109 to All Offerors/bidders 36c24725q0195 x x x x 1 this Amendment To Solicitation 36c24725q0195 Is To Do The Following: (1) Add Additional Language To The Scope Of Work (2) Provide Responses To The Request For Information (rfi) Received Prior To Due Date (see Attached). *all Other Terms And Conditions Remain Unchanged. quentin Deloney contracting Officer, Nco-07 page 5 Of 5 request For Information 36c24725q0195 facility Mover And Event Set-up Services *any Questions Received That Have Not Been Answered In This Amendment Have Already Been Addressed In The Posted Solicitation. scope Of Work Is Amended To Add The Following: The Contractor Shall Furnish All Contract Oversight, Management; Supervisory And Technically Trained Personnel; Uniforms; Equipment, Materials, And Supplies Necessary To Provide Commercial Office Moving And Relocation Services For Cavhcs. This Includes, But Is Not Limited To The Following, Providing All Labor, Materials, And Equipment Necessary To Accomplish The Work As Stated Herein, E.g., Excess Property Pickup; Furniture Installation; Systems Furniture Installation, Breakdown And Repair; Routine Moving Services Activities; Special Event Set-ups And Breakdown; Special Furniture Cleaning And Repair; Special Moving Activities; Place Furnishing In Designated Storage Areas In An Organized Manner; And Special Handling Moving Activities. Contractor Shall Furnish All Vehicles, Insurance, Drivers, Supervision, Maintenance, Equipment, And Operating Supplies/services Required For The Safe Transport Of The Property And Performing All Services Necessary To Provide Moving And Relocation Services. 1. Confirm There Are 6 Locations With 4 Being In Alabama And 2 In Ga. That Will Need To Be covered. -9 Possible Work Locations; 3 Georgia Locations; 6 Alabama Locations -215 Perry Hill Road, Montgomery, Al 36109-3725 (main Work Site) -8105 Veterans Way, Montgomery, Al 36117-3879 -2400 Hospital Road, Tuskegee, Al 36083 (main Work Site) -3753 Ross Clark Circle, Suite 4, Dothan, Al 36303-2291 -159 Whetstone Street, Monroeville, Al 36460-2625 -301 Andrews Ave, Fort Rucker, Al 36362-5107 -6635 Bass Road, Fort Moore, Ga 31905-5602 -2100 Comer Avenue, Plaza G, Columbus, Ga 31904-8725 -6910 River Road, Columbus, Ga 61904-2316 2. In The Previous Notification We Seen 2 Locations Located On A Military Base That Were Not Listed On the Solicitation. Will They Be Covered? -past Solicitations/contract Awards Will Not Be Addressed 3. Will The Us Veterans Affairs Be Assisting In Obtaining Military Passes To Gain Access To The bases? - When Delivering To Those Locations, Contractor Must Meet All Requirements By The Base To Gain Access. A Va Representative Will Be Onsite, But This Does Not Mean Any Of The Requirements Will Be Waived. Contractor Will Know At Least A Week In Advance Of Any Deliveries Going To The Base. 4. You Stated Work Is To Be Performed Mon- Fri. But Days Can Be Changed And On Calls Can Bedone. Please Clarify? -please Read The Solicitation In Its Entirety. Solicitation States As Needed Schedule Updates Shall Be Coordinated With And Approved By The Cor. Such Changes Will Be Coordinated In A Manner Both Parties Can Agree On. 5. Will There Be A Set Schedule Confirmed At The Beginning Of The Contract For The Duration Of the Contract? - No Set Schedule But Schedule Will Be Reasonable And Agreed Upon By Va And Contractor. 6. If No Set Schedule, When Will We Be Notified Services Are Needed? -a Week In Advance 7. Will The Va Be Able To Add Days On Through The Week With Last Minute Notices? -yes, As Long As The Hours Do Not Exceed The 860 Hours Allotted For The Year. 8. Is The Price Schedule 860 Hours? -please Read The Solicitation In Its Entirety. The Base And Each Option Year Is Allotted 860 Hours. 9. Is 860 Hours Guaranteed For The Year? -no; 860 Hours Worth Of Work Are Not Guaranteed To Be Used Each Year. 10. Are You Guaranteeing 8-hour Workdays? -no 11. Are We Working 1-2 Hours, 4-5 Hours, Or Full 8-hour Days? - Contractor Should Plan For Between 4 To 8-hour Days. 12. Will Items Be Left On The Truck From The Prior Day, Overnight, To Be Delivered The Following day? - The Government Does Not Expect Items To Be Left On Trucks. Contractor Is Responsible For Loading And Unloading Mover Vehicles, Therefore, It Is At The Contractor S Discretion And Cost To Store Any Items During Moving Activities And Should Be With The Approval And Proper Notification Being Made To The Cor. 13. Can You Clarify Excess Pickup? Are We Expected To Move Medical And It Equipment? Could You Give Examples Of Oversized Items? - This Could Be Cubical Panels, White/glass Boards, Desks, Etc.. Examples Of Oversized Equipment May Include Pews, Conference Room Tables, Desks, And Storage Cabinets. 14. Confirm That You Are Aware That There Are 6-8 Services Added On That Were Not There In The previous Years? Therefore, This Will Drive The Hourly Rate Up Tremendously. -previous Contract Awards; Solicitations; Or Occurrences Will Not Be Addressed. Only Clarifications On The Information Presented In The Current Solicitation Will Be Made. 15. Our Hourly Rate Are To Include Pricing For Equipment, Labor, Fuel, Miles, Etc..? -hourly Rate In Proposals Should Be All Inclusive. 16. Under Specialty Furniture Cleaning And Repair. Can You Clarify The Repair Service Needed? - Re-attaching Doors To Furniture; Replacing Missing Screws/nuts On Furniture; Replacing Arms On Task Chairs; Or Glides On Tables/chairs. 17. If A Repair Is Performed Who Takes The Liability Of That Item Breaking Again? - If A Repaired Item Breaks Due To The Repair Being Negligent, The Contractor Will Be Held Liable. 18. Will We Be Moving Equipment That Is Still Covered Under The Warranty? - Yes, Some Items May Be Under Warranty Such As Desk And Chairs. 19. Will We Be Mounting Items On Walls? Provide Examples? - Not On A Regular Basis. For Example, Some Workstations Mount To The Wall And Other Furniture Must Anchored To The Wall To Prevent Tilting. 20. Who Will Be Responsible For Holes In The Wall And Where Does That Fall Under The Lease agreements Of These Buildings And Who Will Be Responsible? 21. Could You Provide More Details On The Specific Tasks Involved In The Relocation, Moving, And Event Set-up Services - Please Read The Solicitation In Its Entirety 22. What Is The Expected Volume Of Items (e.g., Office Furniture, Equipment) To Be Moved And Set Up? - Unpredictable; As Needed Basis 23. Are There Any Special Handling Requirements (e.g., Fragile Or High-value Items)? -please Read The Solicitation In Its Entirety. 24. Can You Confirm If This Will Be A Firm-fixed-price Contract? -yes 25. Will The 860 Hours Be Paid Regardless Of Whether They Are Utilized? -no; Only Hours Worked Will Be Payable 26. Will This Be An On-call Contract, Or Will There Be A Confirmed Schedule? - For On Lease Properties, Movers Will Not Be Mounting Anything To The Wall. For The Two Main Campuses (central Alabama Veterans Health Care System East Campus 2400 Hospital Road, Tuskegee, Al 36083 And Central Alabama Veterans Health Care System West Campus 215 Perry Hill Road, Montgomery, Al 36109-3725) Cor Will Work With Maintenance To Repair Holes In The Wall From Furniture Removal. The Movers Are Not Expected To Paint Or Patch Unless The Movers Have Damaged Walls Or Doors Due To Negligence And/or Accident. 27. Are There Any Penalties For Delays Or Failure To Meet Performance Standards? -yes, Unsatisfactory Ratings; Opt-out Of Exercising Options; And Possible Termination For Cause 29. Are There Specific Quality Assurance Standards That Need To Be Adhered To? - Please See Attached Quality Assurance Plan Posted On Page 89.
Closing Date15 Jan 2025
Tender AmountRefer Documents 

NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY USA Tender

Civil And Construction...+2Consultancy Services, Civil And Architectural Services
United States
Details: Amendment 0001 - The Due Date For Qualifications Has Been Extended To Monday, January 13, 2025, 2:00pm Est. Government Responses To Rfi's Have Been Attached To This Notice. description: this Is A Request For Qualifications For Architect And Engineering (a&e) Services. This Request Is 100% Set-aside For Small Business’s Registered Under The Applicable Naics Code 541330 – Engineering Services, With A Size Standard Of $25,500,000. the National Institute Of Standards And Technology (nist), An Agency Of The U.s., Department Of Commerce, Intends To Award Multiple Indefinite Delivery Indefinite Quantity (idiq) Contract(s) For General Architectural And Engineering (a/e) Services For The Nist Gaithersburg Campus Located At 100 Bureau Drive, Gaithersburg, Md 20899. A/e Services Under The Contract May Include The Following: evaluation And Feasibility Studies To Include Engineering Modeling And Simulation demolition Of Nist Structures, Utilities, And Infrastructure repair And/or Repair By Replacement, Modification/reconfiguration, Building Additions, And Upgrades To Nist Facilities (e.g., Laboratories/scientific Research, Office, Industrial). Including But Not Limited To Architectural, Mechanical, Electrical, Communications, Structural, Fire Protection, And Building Enclosure (e.g., Roofs, Windows, Foundations). repair And/or Repair By Replacement, Modification/reconfiguration For Campus Utility Systems And Supporting Underground Structures comprehensive Historical Assessments For The Preservation, Rehabilitation, And Restoration Of Historic Property interior Design Services Consisting Of Programming And Space Assessment, Fit Plans, And Office Furniture To Enhance Aesthetics, Comfort, Efficiency, And Workplace Safety. cost Estimating For Different Levels (e.g., Concept, Detailed Program, Project) life Cycle Cost Analysis Identifying Cost Elements From Initial Concept Through Operations, Support, And Disposal. hazardous Material Survey And Risk Assessment (e.g., Asbestos, Mold, Lead Paint) roofing And Waterproofing Services Such As Visual Inspections And Existing Conditions Surveys, Failure Investigation, And Design For Repairs. commissioning Design Including Assistance Of Development Owner’s Project Requirements (opr), Design Document Reviews, Development Of Commissioning Specifications And Or Initial Commissioning Plan program Of Requirements (por) Development By Meeting With Campus Personnel And Confirming Design Intent For Building And/or Major Systems (e.g., Mechanical, Electrical, Plumbing, Structural, Controls, Security, Fire Alarm, Etc.) value Engineering Analysis To Achieve Design Goals While Lowering Life Cycle Costs And Maintaining The Required Performance, Quality, Reliability, And Maintainability. record Drawings Development From Compiled As-built Set. surveying (e.g., Alta/ascm, Boundary, Topographic, Construction, Site Planning) roads/sidewalks Repairs And Replacement evaluation Of Items Requiring Earthwork Such As Excavation, Grading, Ponds, Drainage, Foundation, And Footings landscaping Design gates, Fencing, And Related Engineering Necessary To Support A Campus Environment permit Applications Submission To Regulatory Authorities Based On Specific Project Requirements. To Be Coordinated With Cor And Or Ahj For Acceptance And Or Approval environmental Compliance (state Or Federal) Conforming To Laws, Regulations, Standards, And Other Requirements construction Quality Management To Include But Not Limited To Commissioning Services contract Information: the Period Of Performance Of The Idiq Contract(s) Shall Be Five (5) Years. Annual Fully Burdened Labor Rates Will Be Negotiated Prior To Award. All Services Will Be Ordered Via The Issuance Of Individually Negotiated Firm-fixed-price Or Not­to-exceed Task Orders, Ranging In Value From $10,000 And $2,000,000. Each Idiq Contract Shall Include A Guaranteed Minimum Order Of $5,000. The Cumulative Amount Of All Task Orders Shall Not Exceed $9,800,000. the Government Anticipates Award Of Three (3) Or More Idiq Contracts; However, The Actual Number Of Awards Shall Be Made At The Discretion Of The Government. submission Requirements: consideration Will Be Limited To Professional A/e Firms Licensed And Registered In Maryland Who Provide A/e Services Primarily In The Disciplines Of Architectural, Civil, Structural, Mechanical, Electrical, And Environmental Engineering For Pre-design, Design, And Post-design Of Research Laboratory Facilities. firms Meeting The Above Requirements And Desiring Consideration Must Submit Their Qualifications By No Later Than The Date Specified In This Announcement Via Email To The Following Addresses Using The Email Subject Line “rfq Submission – General Ae Services Idiq Nb195000-25-00009”: Trent.stevens@nist.gov Guzel.gufranova@nist.gov Teresa.harris@nist.gov qualification Submissions Shall Include One (1) Original Electronic Copy In Adobe .pdf Format Of Their Standard Form 330 (sf-330) With Appropriate Data. Ae Firms Shall Include All Subcontractor's Resumes In Part 1 Of The Sf-330. Part 2 Of The Sf-330, General Qualifications, Should Also Be Submitted For Each Subcontractor Or Consultant. Indicate The Solicitation Number On All Documentation Submitted. along With The Sf-330, Offerors Shall Include: a Copy Of Your Current Registration In System For Award Management (sam); proof Of Small Business Status; a Cover Page That Provides: offeror’s Name And Address; offeror’s Uei Number; And, the Name, Title, Email, And Phone Number For The Authorized Representative Of The Offeror. submissions Will Be Evaluated By A Source Selection Evaluation Board (sseb) And Ranked Based On The Stated Evaluation Factors. The Government Will Then Establish A Competitive Range; Firms That Fall Within This Range Will Be Invited To Present Their Capabilities To The Sseb. Formal Solicitations Requesting Fee Proposals Will Be Issued To The Highest Qualified Firms As Determined By The Government. request For Information (rfi) questions And Rfi's Must Be Submitted No Later Than 1:00pm Et On 12/10/2024 Via Email To The Following Addresses Using The Subject Line “rfi - General Ae Services Idiq Nb195000-25-00009” : Trent.stevens@nist.gov Guzel.gufranova@nist.gov. the Contracting Officer Will Post Government Responses To Rfi’s On This Site As An Amendment To This Announcement. Firms Are Responsible For Monitoring This Site For Amendments To The Request For Qualifications. selection Criteria: all Work Performed Shall Be Under The Direct Control And Supervision Of A Professional And Experience Licensed Architect/engineer Employed By The Prime Contractor Assigned As The Responsible Party. part I: Evaluation Of Sf-330 prospective A-e Firms Will Be Evaluated Based On Their Demonstrated Competence And Qualifications For The Type Of Professional Services Required. The Agency Will Evaluate Each Potential A-e Firm In Terms Of This Announcement. The Selection Criteria Are Listed Below In Descending Order Of Importance: factor 1: Specialized Experience page Limit – 15 Pages firms Who Fail To Meet The Qualifications Of Factor 1 Will Not Be Evaluated On Subsequent Evaluation Factors And Will Not Be Considered For Award. offeror Shall Demonstrate The Specialized Experience And Technical Competence Of Its Firm And Its Proposed Subcontractors Performing A/e Services Meeting The Criteria Of This Solicitation Within The Past Sixty (60) Months By Providing At Least 3 But No More Than 5 Example Projects (sections F, G, And H Of The Sf330) Addressing Each Of The Subfactors Listed Below (1a, 1b, 1c, And 1d). Offeror Shall Provide At Least One Example For Subfactor 1d. All Designs Shall Be Completed At Time Of Request For Qualifications (rfq). For The Purposes Of This Evaluations, “completed” Projects Shall Mean Projects Where Final Work Was Submitted, Approved, And Accepted By The Project Owner. A. The Offeror Shall Describe Design For Renovations With Dates That Include Commercial Window Replacements, Masonry Repairs, And Roofing Repairs. Roofing Designs Are For Replacement Of An Existing Roofing System And Would Include Design And Specifications For New Built-up Roofs (at Least Three Ply) Of At Least 20,000 Sf Minimum, Including Drains, Coping And Flashing. Built Up Roofing Can Either Be Hot Or Cold Applied. B. The Offeror Shall Also Describe With Dates Laboratory Design For Renovations Of At Least 2,000 Sf Which Include Replacement Or New Fume Hood Installation Of A Fume Hood At Least Four Feet In Width, New Laboratory Grade Casework, New Seamless Flooring, And Plumbing That Includes Either Eye Wash Station Or Safety Showers. Laboratories Shall Be For Commercial Facilities, Federal And State Facilities, Hospitals, And College/universities. High School And Lower School Grade Laboratories Will Not Be Considered. C. The Offeror Shall Describe With Dates Designs That Include Laboratory Facility Mechanical, Plumbing, And Electrical Renovations, Upgrades And Alterations That Include Major Utility Systems, Facility Construction And Reconfiguration, Branch Circuits Of At Least 50 Amperes At 208v Or 480v, 3 Phase Power For Installation Of Specialized Scientific Tools, Equipment And Instrumentation (provide Amperage, Phases, And Voltages In Offer). The Contractor Shall Describe Distribution Of Manifold Specialty Gasses Utilizing At Least One Of The Following (nitrogen, Helium, Compressed Air, Or A Custom Blend) Within The Lab (note Which Gas Was In Manifold). D. The Offeror Shall Describe, With Dates, Life Safety And Code Compliance Of The Following: Ibc And Nfpa Analyses, Access And Egress Analyses, Fire Alarm Systems And Device Designs, Nfpa 13 Fire Suppression System Modification Calculations And New Installations, And Hazardous Detection Systems (radiological Or Toxic Gas Monitoring Systems). Note Which Detection System (radiological Or Toxic Gas Monitoring System) Is Being Referenced. factor 2: Professional Qualifications page Limit – 17 Pages the Offeror Shall Demonstrate The Technical Expertise And Professional Qualifications Of Its Proposed Team, Including Subcontractors And Consultants, To Perform The Required A/e Services By Providing Résumés (section E Of The Sf330) For All Of The Following Disciplines: principle senior Architect senior Cost Estimator senior Civil Engineer senior Electrical Engineer senior Fire Protection Engineer senior Geo-technical Engineer senior Laboratory Planner mechanical Engineer (piping) senior Mechanical Engineer (piping) senior Mechanical Engineer (hvac) senior Environmental Engineer senior Scheduler senior Surveyor senior Water Proofing Engineer senior Structural Engineer 2. Senior Positions Of Each Discipline Shall Have A Minimum Of Ten (10) Years Applicable Experience And Shall Be Licensed And/or Certified In Their Applicable Discipline. 3. The Offeror Shall Identify The Roles Of Its Key Personnel By Provide Resumes/sf 330s For Its Proposed Key Personnel That Include Credentials, Education, Registrations, Relevant Experience, And Their Role In Performing Requirements Outlined In Factor 1. 4. The Offeror Shall Submit An Organizational Chart Showing The Interrelations Of The Proposed Team Including All Subcontractors And Consultants. factor 3: Geographical Location page Limit – 1 offeror Shall Be Within 50 Miles Of The Nist Main Campus In Gaithersburg, Md. Nist Address Is 100 Bureau Drive, Gaithersburg, Md 20899. Offeror Shall Demonstrate This Distance By Submitting Information (driving) Via An Internet Mapping Program. The Driving Shall Begin At The Offeror’s Office To Nist. factor 4: Capacity page Limit – 2 Pages the Offeror Shall Describe Their Team, Including Subcontractors, Capability To Complete Simultaneous Tasks Within The Required Timeframe Based On Current And Planned Workload And Expected Backlog. the Offeror Shall Confirm That There Is Sufficient Capacity Within The Firm, Or That Additional Professional Capacity Can Be Increased As Needed In A Timely Manner To Deliver Projects That Meet The Government’s Specialized Requirements. factor 5: Past Performance page Limit – None offeror Shall Provide Past Performance Information For The Relevant Projects Identified In Their Factor 1 – Specialized Experience Submission In The Form Of Either A Contractor Performance Assessment Reporting System (cpars) Report Or The Provided Past Performance Questionnaires (ppqs). if The Project Was Completed For The Federal Government, The Offeror Shall Provide A Copy Of The Most Recently Completed Contractor Performance Assessment Reporting System (cpars) Report. if No Cpars Is Available, Offeror Shall Use The Provided Past Performance Questionnaire (ppq). Ppqs Shall Be Completed And Signed By The Customer Identified In The Relevant Project. Limit Of One Ppq Per Project. if An Offeror Submits Incomplete Past Performance Or Fails To Submit Any Past Performance Information, The Government May Evaluate Past Performance Based On The Information Obtained Concerning The Offerors’ Performance Relevant To Services Similar In Scope, Complexity, And Size For The Prime Contractor. Additionally, The Following Resources Will Be Used For Evaluation: contractor Performance Assessment Reporting Systems (cpars), Or Similar Systems Of Other Government Departments And Agencies, interviews Within Nist If Offeror Holds/held Previous Contracts, interviews With Program Managers And Contracting Officers, And; other Sources Known To The Government, Including Commercial Sources. in The Case Of An Offeror Without A Cpars Record Of Relevant Past Performance Or For Whom Information On Past Performance Is Not Available, The Offeror Shall Be Rated Neither Favorably Nor Unfavorably. part Ii: Oral Presentations in Accordance With Far 36.602-3, The Government Will Hold Discussions With At Least Three Of The Most Highly Qualified Firms (firms Within The Competitive Range). More Details Related To The Presentations Will Be Provide To The Firms That Are Selected To Move Forward. fee Proposal only Those Firms Selected For Award Will Be Invited To Provide A Fee Proposal. Firms Shall Submit Along With Their Fee Proposal A Copy Of Audited Overhead Rate Statement Prepared In Accordance With The Federal Acquisition Regulation (far), Part 31 For The Prime And Their Sub-consultants. The Audit Must Be From A Federal, State, Local Government Or An Independent Third-party Auditor In Accordance With Far 31. Audit Conducted In Accordance With Generally Accepted Accounting Principles (gaap) Will Not Be Accepted.
Closing Soon13 Jan 2025
Tender AmountRefer Documents 

Bureau Of Plant Industry Tender

Others
Philippines
Details: Description Rfq No. 1396 Pr No. 4122-24bac Request For Quotation For Goods And Services Section 53.9 Negotiated Procurement - Small Value Procurement "supply, Delivery And Installation Of Modular Office Partition Table And Furnitures" Section I. Mandatory Requirements (note: Failure To Submit Any Of The Following Requirements Will Be Automatically Disqualified) A. Philgeps Registration (platinum Membership And Red Membership) Ü Mayor's / Business Permit Ü Income/business Tax Return (for Abc 500k And Above) Ü Certificate Of Bir Registration (for Abc 50k And Above) Ü Dti Registration Submit A Clear Copy Or Documentation Of The Proof Of Payment For The Renewal Of Expired Permit/s. B. Photocopy Of One (1) Company Id Or One (1) Valid Id W/ Three (3) Specimen Signature C. Notarized Original Omnibus Sworn Statement (for Abc 50k And Above) D. Professional License/curriculum Vitae (consulting Services) E. Menu List For Catering Services F. The Supplier Must Not Have Any Record Of Non-compliance Over The Past Three (3) Years. Section Ii. Instructions: 1. Please Write Legibly. 2. The Bidders/suppliers Or Their Authorized Representative Shall Accomplish This Form Including Unit Price And Total Price As Well As Sub- Total And Grand Total (if Applicable) And Affix Their Signature Over Printed Name Indicated In The Lower Portion Of This Form. 3. Indicate Offered Brands And Specifications (if Applicable). 4. Quotation(s)/proposal(s) Shall Be Submitted At The Procurement Management Section (bac Office), Bureau Of Plant Industry, 692 San Andres Street, Malate, Manila Or Through Courier Or Email (pms.rfq@buplant.da.gov.ph). 5. Only Sealed Canvass Submitted In Person Or Through Courier Shall Be Considered By The Bac. The Bidders/suppliers Shall Reflect On The Envelope The Rfq Number And The Pr No. The Bac Shall Not Be Responsible On The Pre-emptive/premature Opening Of The Proposal. 6. Any Insertions, Erasures, Or Overwriting Shall Be Valid If Only They Are Signed Or Initialed By The Bidders/suppliers Or Their Authorized Representative. 7. Quotation Must Include All Kinds Of Taxes For The Item(s)/services Listed Hereunder, Including Delivery Charges. 8. Price Quotation(s) Submitted Shall Be Valid For A Period Of One Hundred Twenty (120) Days Reckoned From The Deadline For Submission Of Quotations As Reflected In This Form. 9. Awarding Shall Be Done Per Lot. 10. Deadline For Submission Of Bids: January 6, 2025 (9:00am). 11. In Case Of Two Or More Bidders Are Determined To Have Submitted The Lowest Calculated And Responsive Quotation Or Highest Rated And Responsive Quotation For Consultancy Services, The Bpi- Bac Shall Employ The Rules Specified In The Irr Of Ra 9184. 12. Delivery/installation/completion Period: Thirty To Sixty (30-60) Calendar Days Upon Reciept Of Purchase Order (p.o.). 13. The Uniform Guidelines For Blacklisting Set Forth In Appendix 17 Of The 2016 Revised Irr Of Ra 9184 Shall Apply. 14. The Supplier/bidder/contractor Must Have No Violation With Its Transactions With The Bureau Based On Bpi Records And Bpi Memorandum Order 328 Series Of 2023. 15. The Bureau Of Plant Industry Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. "notice/announcement: Bureau Of Plant Industry Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. " Approved Budget For The Contract: Php 986,168.00 End User: Npqsd-central Office Qty Unit Item/description Ceiling Price/ Offered Unit Total Per Unit(php) Brand Price Price Capital Outlay- Furnitures And Fixtures 1 Lot Supply And Installation Of Modular Office Partition Table And Furniture 986,168.00 "place Of Delivery: Bpi-malate, Manila Proposed Delivery Period: 30-60 Calendar Days From The Receipt Of Purchase Order" Grand Total 986,168.00 Philgeps Posted Joan-may R. Tolentino Bac Chairperson Canvasser The Bpi-bids And Awards Committee (bac) 692 San Andres, Malate Manila In Connection With The Above Request, I/we Submit Our Quotation Indicated Above. I/we Have Carefully Read And Fully Understand The Minimum Requirements And Agree To Furnish And/ Or Deliver The Above Mentioned Requirement(s) In Conformity With The Specifications/terms Or Reference/scope Of Work Indicated/attached Thereto. ________________________________________ _________________________________ __________________ ________________________________________ Signature Over Printed Name Company Name Of Bidder Philgeps Registration Number ________________________________________ _________________________________ __________________ ________________________________________ Contact Number(s) Office Adress Email Address Of The Bidder ________________________________________ ________________________________________ Tax Identification Number (tin) Date Accomplished Payment Shall Be Made Through Land Bank's Lddap-ada/bank Transfer; Bank Transfer Fee Shall Be Charged Against The Creditor's Account. Payment Details: Banking Institution: ________________________________________________ Account Number:___________________________________________________ Account Name:______________________________________________________ Branch:_______________________________________________________________
Closing Soon6 Jan 2025
Tender AmountPHP 986.1 K (USD 16.9 K)

PUBLIC BUILDINGS SERVICE USA Tender

Real Estate Service
Corrigendum : Closing Date Modified
United States
Details: U.s. Government general Services Administration (gsa) Seeks To Lease The Following Space: state: Massachusetts city: Hanover delineated Area: Entire Town Limits Of Hanover, Ma. minimum Sq. Ft. (aboa): 6,160 maximum Sq. Ft. (aboa): 6,809 space Type: Office parking Spaces (total): 0 parking Spaces (surface): 0 parking Spaces (structured): 0 parking Spaces (reserved): 0 full Term: 15 Years - 180 Months firm Term: 10 Years – 120 Months option Term: N/a additional Requirements: offered Space Must Meet Government Requirements For Fire Safety, Accessibility, Seismic, And Sustainability Standards Per The Terms Of The Lease. A Fully Serviced Lease Is Required. Offered Space Shall Not Be In The 100-year Floodplain. entities Are Advised To Familiarize Themselves With The Telecommunications Prohibitions Outlined Under Section 889 Of The Fy19 National Defense Authorization Act (ndaa), As Implemented By The Federal Acquisition Regulation (far). ). For More Information, Visit: Https://acquisition.gov/far-case-2019-009/889_part_b. .agency Unique Requirements agency Tenant Improvement Allowance: $64.26 Per Aboa Sf building Specific Amortized Capital (bsac): $25.00 Per Aboa Sf additional Requirements: site Access Shall Be Via A Direct Route From A Primary Or Secondary Street. traffic Control Devices And Pedestrian Crosswalks Are Required Within Two Blocks. sidewalks And Pedestrian Walkways Shall Be Present Along Roadways And Access Roads. public Transportation Route Stops Shall Be Located Within .25 Mi Of The Offered Location. The Public Transportation Must Service This Location On An Hourly Basis (minimum) From 8:00 A.m. To 3:00 P.m., Except Saturdays, Sundays, And Federal Holidays. public Parking Shall Be Available On Site Or Within .25 Miles Of The Offered Space. Restricted Or Metered Parking Of One Hour Or Less Within .25 Miles Of The Space Does Not Meet Parking Requirements. there Shall Be No History Of Prior Heavy Industrial Use, Such As Dry Cleaning Operations, Gas Stations, Rail Yards, Or Machinery Maintenance Yards. the Site Shall Not Be Located Within .25 Mi Of Active Railroad Tracks, Airports Or Heavily Congested Highways. there Shall Be Adequate Eating Facilities Located Within .5 Miles. Other Employee Services, Such As retail Shops, Cleaners, Banks, Etc., Shall Be Located Within 2 Miles. mixed Use Sites With Residential Or Living Quarters Located Within The Building Are Not Acceptable. sites Located Immediately Adjacent To Establishments Whose Primary Operation Is The Sale Of Alcoholic Beverages, Marijuana Dispensaries, Firearms Sold/discharged, Drug Treatment, Or Detention Facilities Are Not Acceptable. the Site Shall Be Class A Standard Commercial Or Office Space Consistent With The Local Market. the Site Shall Not Be Located Below Grade. sites Located Above Street Level Are Required To Have A Minimum Of Two Accessible Elevators. One Of The Accessible Elevators May Be A Freight Elevator. Elevators Shall Not Discharge Directly Into Ssa Space. the Space Is Required To Be Contiguous. the Space Is Required To Be Level And Shall Not Utilize Interior Ramps To Resolve Changes In Grade. the Space May Not Be More Than Twice As Long As It Is Wide. the Space Must Be Conducive To Ssa’s Business Operation Design. Space Elements Such As Quantity And Size Of Columns, Load Bearing Walls, Irregular Shape, Etc., May Not Impede An Efficient Space Layout, The Use Of Modular Furniture, Or Office Work Flows. Ssa Shall Prepare A Test Fit To Confirm The Acceptability Of The Space. ceilings Shall Be 9’ To 12’ As Measured From Floor To The Lowest Obstruction. sufficient Space Shall Exist Between The Drop Ceiling And The Deck Of The Floor Above To Allow For Lighting, Hvac Equipment, Fire Suppression Piping, Etc. the Site Shall Have Two Lines Of Windows For Natural Lighting. interested Parties Must Provide The Name Of The Building, Address, Location Of Available Space, Rentable Square Feet Offered, And Contact Information Of Authorized Representative. all Interested Parties Must Either Submit Evidence Of Ownership Or Written Authorization To Represent The Owner(s). Any Submissions Received Without Documentation Of Ownership And/or Written Authorization To Represent The Owner(s) Will Not Be Considered Until Such Time The Documentation Has Been Received, Which Must Also Be Submitted Prior To The Expression Of Interests Due Date in Cases Where An Agent Is Representing Multiple Ownership Entities, Broker Must Provide Written Acknowledgement/permission To Represent Multiple Interested Parties For The Same Submission. reference Project Number:2ma0212 please Submit Your Offer No Later Than 4:00 P.m. Eastern Time On January 31, 2025 Using The Lease Offer Platform/requirement Specific Acquisition Platform (lop/rsap) Located Athttps://lop.gsa.gov/rsap expressions Of Interest Due: December 16, 2024 market Survey (estimated): Tbd occupancy (estimated): Tbd send Expressions Of Interest To: Clare Nawrocki 10 Causeway Street, 11th Fl., Boston, Ma 02222 617-513-1831 email Address: Clare.nawrocki@gsa.gov government Contact Information: lease Contracting Officer carrie Rosenman
Closing Date31 Jan 2025
Tender AmountRefer Documents 

Government Of New Brunswick Tender

Machinery and Tools
Canada
Description: This Procurement Is Subject To The Provisions Of The Canadian Free Trade Agreement And The Canada-european Union Comprehensive Economic And Trade Agreement. Where Permissible Under The Applicable Trade Agreements And The Regulation Under The Procurement Act, Service New Brunswick Reserves The Right To Give Preferential Treatment To A Prospective Supplier From New Brunswick. Should This Right Be Exercised, The Following Order Of Priority Will Apply: A) Firstly, New Brunswick Manufacturers If The Goods To Be Procured Are Manufactured In New Brunswick; And B) Secondly, New Brunswick Vendors. When Bid Submissions Are Evaluated On Price: - Applicability Of The Preferences Will Be Determined Based On The Price Differential Between The Lowest-priced Acceptable Bid And The Bid Receiving The Preferential Treatment. - The Price Differential Under Which A Nb Supplier Preference May Be Applied Will Vary Between 2.5% And 10% Depending On The Total Estimated Value Of The Procurement, In Accordance With The Ranges Set Out In The Regulation Under The Procurement Act. - The Preferential Treatment Will Be Applied By Making The Award To The Nb Supplier. When Bid Submissions Are Evaluated On A Point System: - Applicability Of The Preferences Will Be Determined Based On The Price Differential Between The Pricing Component Of The Highest Scoring Acceptable Bid Submission And The Pricing Component Of The Bid(s) Receiving The Preferential Treatment. - The Price Differential Under Which A Nb Supplier Preference May Be Applied Will Vary Between 2.5% And 10% Depending On The Total Estimated Value Of The Procurement, In Accordance With The Ranges Set Out In The Regulation Under The Procurement Act. - The Preferential Treatment Will Be Applied By Allotting A Maximum Of An Additional 5% Of The Total Possible Points To New Brunswick Manufacturers' Total Scores And 4% To Nb Vendors' Total Scores. If No Bid From A New Brunswick Manufacturer Has Been Retained For Preferential Treatment, New Brunswick Vendors May Receive A Maximum Of An Additional 5% Of The Total Possible Points Rather Than 4%. The Decision To Apply A Preference Will Be At The Sole Discretion Of Service New Brunswick. To Be Eligible, Suppliers Must Meet The Definition Of Nb Supplier As Identified By The Regulation Under The Procurement Act. Nb Manufacturers Should Indicate In Their Bid That They Are A Nb Manufacturer To Be Considered For The Nb Manufacturer Preference. Movers, Furniture And Office Equipment And Storage Scope This Invitation To Tender Consists Of Moving Services As Per The Attached Specifications On Behalf Of The Department Of Transportation And Infrastructure, For A Period Of Two (2) Years From February 1, 2025 Until January 31, 2027 With The Option To Renew For Two (2) Additional One (1) Year Periods In One (1) Year Increments Upon Written Agreement By Both Parties. Option Year Pricing Shall Be Subject To Negotiation Of A Satisfactory Contract Price Not To Exceed The Tendered Price Plus Any Published Increase In The New Brunswick Consumer Price Index. Contract Award Criteria Contract Will Be Awarded To The Lowest Compliant Bid Which Meets The Requirements Detailed Within The Attached Specifications For Items 3 To 13 Of The Tender Documents. The Criteria For Awarding This Tender Will Be Based On The Total Lowest Compliant Bid Of The Hourly Rates (both Regular And Overtime, Items 3 Through 13) Required To Perform The Work. Note See Appendices A, B & C Located In The Attached Specification. Requirements Prior To Award, References, Criminal Record Checks, Insurance And Worksafe Nb Registered And In Good Standing, Will Be Required As Per Section 4, 9, 15 And 16 Respectively. Prior To Award, Appendix "c" (located In Specifications) Must Be Completed And Submitted. It Is Recommended To Submit The Completed Document With Your Bid Submission. How To Fill In Pricing There Are No Additional Pricing Sheets To Be Completed With This Bid. Vendors Should Bid Directly On This Invitation To Tender. How To Fill In Pricing: Unit Price = Price Per Hour The Price Bid Shall Not Include Hst. Vendors Are Required To Sign And Date Their Bid In The Space Provided Below Vendor Questions All Inquiries Should Be Received Seven (7) Calendar Days Prior To The Closing Date; Any Inquiries Received Less Than 7 Calendar Days Prior To The Closing Date Cannot Be Guaranteed A Response. Please Reference The Tender Number And Closing Date Within Your Communications To Ensure A Prompt And Accurate Reply. This Is A Tender Notice Only. In Order To Submit A Bid, You Must Obtain Official Tender Documents From The New Brunswick Opportunities Network, Another Authorized Tendering Service Or As Indicated In The Tender Notice. Solicitation Documents Will Be Provided In Either Of The Province Of New Brunswick's Two Official Languages; English Or French Upon Request. Instructions For Bid Submission 1. Effective April 15, 2020, Service New Brunswick Is No Longer Accepting Paper Bids, And The Central Tendering Branch Is Closed To The Public. Public Tender Openings Are No Longer Taking Place; However, Results Continue To Be Posted On Nbon. 2. Bids Will Only Be Accepted By Electronic Transmission As Follows: A. By E-bidding Through Nbon (when E-bidding Is Possible); Or B. By Fax To: (506) 444-4200 (fax To Dedicated Mailbox). Note: Proposals In Response To A Request For Proposals (rfp) Will Not Be Accepted By Fax; Or C. By Email To Nbbids@snb.ca Or Soumissionsnb@snb.ca (do Not Submit Bids To Any Other Email). Click Here Instructions For Bid Submission For Important Instructions On How To Submit Bids By Email. D. Please Refrain From Submitting Your Bid Through Multiple Electronic Channels To Avoid Duplicate Bids. 3. All Bids Must Be Properly Signed By An Authorized Person. A. For Bids Submitted By Email Or Fax: Typed Signatures (in Any Font) That Are Not On The Bid Itself (i.e. In The Body Of The Email Or On The Fax Cover Sheet) Will Not Be Accepted. 4. All Bids Must Be Legible, Properly Completed And Contain The Proper Solicitation Number. 5. The Proponent Is Solely Responsible For Ensuring That The Bid Submission In Its Entirety, Including All Attachments, Is Received Before Closing Date And Time As Indicated On The Solicitation Documents. A. The Proponent Bears All Risk Associated With Delivering Its Bid By Electronic Submission, Including But Not Limited To Delays In Transmission Between The Proponent's Computer And The Province's Electronic Mail System, Nbon Or Fax. B. The Date And Time Of Official Receipt Of The Bid Will Be The Time Of Receipt Recorded In The Nbon System (for E-bids) Or The Time Of Receipt In The Province's Electronic Mail System (for Fax And Email Bid Submissions). 6. All Bids Must Be Stated In Canadian Funds. Sales Taxes Should Not Be Included In The Unit, Extended Or Total Prices. 7. All Tenders Must Be F.o.b. Destination, Freight Prepaid. 8. This Invitation Is Being Conducted Under The Provisions Of The Procurement Act And Regulation 2014-93 As Of The Date Of The Issuance Of The Invitation. Direct Deposit The Province Of New Brunswick Is Now Using Direct Deposit As The Standard Method Of Issuing Payments. Suppliers Are Required To Provide Bank Account Information And An Email Address For The Notice Of Remittance. Please Send The Completed Direct Deposit Form To Service New Brunswick (e-mail Address And Mailing Address Are Indicated On The Form). Please Click On The Link Below To View The Direct Deposit Form. Https://www2.snb.ca/content/dam/snb/procurement/directdepositvirementdirect.pdf A Bidder Must Obtain Official Solicitation Documents From A Distribution Service, Authorized By The Minister Of Service New Brunswick, In Order To Submit A Bid. The Current Authorized Distribution Services Are The New Brunswick Opportunities Network (nbon) (operated By Service New Brunswick, Province Of Nb), Bidsalert (operated By Tendering Publications Ltd.) And Merx (operated By Mediagrif Interactive Technologies). Bids Should Be Submitted On The Official Bid Documents Obtained From These Authorized Distribution Services. The Province Of New Brunswick Reserves The Right To Negotiate Pricing, Value Added And Other Savings Opportunities With The Successful Proponent At Time Of Award And Throughout The Contract. All Suppliers Engaged To Deliver Services On Behalf Of The Government Of New Brunswick Must Ensure Compliance With The Official Languages Act In The Delivery Of Those Services. For More Information, Please Refer To The Official Languages Act. The Atlantic Provinces Standard Terms & Conditions For Goods And Services Apply To This Procurement And Are Considered To Be Incorporated Into This Document. By Submitting A Bid, You Agree And Accept These Terms And Conditions. Current "atlantic Provinces Standard Terms And Conditions" Are Available On The New Brunswick Opportunities Network, The Council Of Atlantic Premiers' Website Or From An Authorized Service Provider. Covid-19 Restrictions For Workers Entering New Brunswick All Suppliers And Workers Entering The Province Of New Brunswick For Work Purposes Must Comply With The Requirements Established By Worksafe Nb And Public Health, Including Isolation Requirements Where Applicable. Click Here For More Information On These Requirements. Questions: Written Questions Relating To This Opportunity May Be Submitted To The Address Provided Below Via Email By Clicking On Questions. Please Be Sure To Include The Solicitation/tender Number In The Subject Line. Email Address: Bidquestionssoumissions@snb.ca Note: This Email Account Is Strictly For The Receipt Of Questions On Open Opportunities. This Email Is Not For The Submission Of Bids. Covid-19 Supplier Vaccination Policy Suppliers Must Comply With All Gnb Health And Safety Policies And Standards Including, Without Limitation, All Health And Safety Policies And Standards Related To Covid-19, As Applicable. Go To Www.gnb.ca/nbon To View The Full Policy And Faqs. Under Canadian Law (and International Agreements), Your Bid Must Arrive Separately And Independently, Without Conspiracy, Collusion Or Fraud; See Http://www.competitionbureau.gc.ca/eic/site/cb-bc.nsf/eng/home For Further Information. Pay Equity Does Your Organization Have 50 Or More Employees? The Government Of New Brunswick Is Committed To Encouraging And Incentivizing The Adoption Of Pay Equity By Employers Doing Business With Government. Prior To The Award Of Procurements For Goods And Services Valued Over $1,000,000, Suppliers, With Fifty (50) Or More Employees Will Be Required To Complete The Pay Equity Learning Module Developed By The Women's Equality Branch. Suppliers Should Provide A Copy Of Their Certificate Of Completion With Their Bid Submission. To Complete The Online Module And Obtain Your Certificate, Please Visit Www.gnb.ca/payequity. For Questions, Please Contact The Pay Equity Bureau Toll Free: (877) 253-0266 Or By Email: Peb-bes@gnb.ca. All Discounts Quoted Will Be Considered To Be Without Limitations. Award Of Contracts: No Contract Shall Be Awarded And No Payment Shall Be Made To A Vendor Unless Authorized By The Minister Or His Delegates. The Minister May Make An Award To The Preferred Vendor Conditional On The Negotiation And Acceptance Of A Detailed Contract Between The Province And The Vendor. In Such Cases, Should The Detailed Contract Negotiations Not Be Completed In A Reasonable Period Of Time, The Province Reserves The Right To Discontinue Negotiations With The Vendor And Subsequently Enter Into Negotiations With The Second Preferred Vendor. No Right Or Duty, In Whole Or In Part, Of The Vendor Under A Contract Issued May Be Assigned Or Delegated Without The Prior Consent Of The Strategic Procurement Branch. Unless Indicated Otherwise In This Tender Notice Or Attached Documents, All Prices Must Be Extended And Totalled. All Suppliers Engaged To Deliver Goods Or Services To The Government Of New Brunswick Must Ensure Compliance With The Designated Materials Regulation In The Provision Or Delivery Of Those Goods Obligated Under That Regulation. Please Refer To Recycle Nb's Website And The Designated Materials Regulation For Specifics. Payment Of Invoices Payment Of Invoices Is The Responsibility Of The Department Or Organization To Whom The Goods Are Shipped Or Services Are Supplied. Where The Estimated Value Of The Goods Or Services To Be Procured Is Below The Lowest Applicable Threshold Value Of Any Relevant Trade Agreement, Service New Brunswick Reserves The Right To Give Preferential Treatment To A Prospective Supplier From New Brunswick. Should This Right Be Exercised, The Following Order Of Priority Will Apply: A) Firstly, New Brunswick Manufacturers If The Goods To Be Procured Are Manufactured In New Brunswick; And B) Secondly, New Brunswick Vendors. When Bid Submissions Are Evaluated On Price: - Applicability Of The Preferences Will Be Determined Based On The Price Differential Between The Lowest-priced Acceptable Bid And The Bid Receiving The Preferential Treatment. - The Price Differential Under Which A Nb Supplier Preference May Be Applied Will Be Limited To 10%. When The Lowest-priced Acceptable Bid Before Preferential Treatment Is Applied Is A New Brunswick Vendor, The Price Differential Under Which A Nb Manufacturer Preference Will Be Applied Will Be Limited To 5%. - The Preferential Treatment Will Be Applied By Making The Award To The Nb Supplier. When Bid Submissions Are Evaluated On A Point System: - Applicability Of The Preferences Will Be Determined Based On The Price Differential Between The Pricing Component Of The Highest Scoring Acceptable Bid Submission And The Pricing Component Of The Bid(s) Receiving The Preferential Treatment. - The Price Differential Under Which A Nb Supplier Preference May Be Applied Will Be Limited To 10%. When The Highest Scoring Acceptable Bid Submission Before Preferential Treatment Is Applied Is A New Brunswick Vendor, The Price Differential Under Which A Nb Manufacturer Preference Will Be Applied Will Be Limited To 5%. - The Preferential Treatment Will Be Applied By Allotting A Maximum Of An Additional 5% Of The Total Possible Points To New Brunswick Manufacturers' Total Scores And 4% To Nb Vendors' Total Scores. If No Bid From A New Brunswick Manufacturer Has Been Retained For Preferential Treatment, New Brunswick Vendors May Receive A Maximum Of An Additional 5% Of The Total Possible Points Rather Than 4%. The Decision To Apply A Preference Will Be At The Sole Discretion Of Service New Brunswick. To Be Eligible, Suppliers Must Meet The Definition Of Nb Supplier As Identified By The Regulation Under The Procurement Act. Nb Manufacturers Should Indicate In Their Bid That They Are A Nb Manufacturer To Be Considered For The Nb Manufacturer Preference. Holiday Season Office Closure The Strategic Procurement Division Of Service New Brunswick (located At 300 St. Mary's Street) Will Be Closed For The Holiday Season. This Includes All Strategic Procurement Operations (except Strategic Procurement - Health), The Reception Area And The Central Tendering Office. The Closure Period Is From 12 P.m. On December 24, 2024 To 8:15 A.m. On January 2, 2025. The New Brunswick Opportunities Network (nbon) Will Be Accessible Throughout This Period, However Please Note Support (helpline And Email Queries) Will Not Be Available During This Time.
Closing Date14 Jan 2025
Tender AmountRefer Documents 

Bureau Of Corrections Muntinlupa City Metro Manila Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Philippine Bidding Documents Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (procurement/contract No. 009) Sixth Edition July 2020 Bids And Awards Committee 202 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 6 Section Iii. Bid Data Sheet 13 Section Iv. General Conditions Of Contract 19 Section V. Special Conditions Of Contract 24 Section Vi. Specifications 26 Section Vii. Drawings 59 Section Viii. Bill Of Quantities 60 Section Ix. Checklist Of Technical And Financial Documents 61 Section I. Invitation To Bid Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Invitation To Bid Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) 1. The Bureau Of Corrections, Through The National Expenditure Program (nep) Of 2025 Capital Outlay, Intends To Apply The Sum Of Three Hundred Million Pesos Only (₱300,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) With Identification Number _epa-009__. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bureau Of Corrections Now Invites Bids For Provision Of A Detailed Preliminary Architectural And Engineering Design, Detailed Engineering Requirements And Actual Construction Of The Bureau Of Corrections Super Maximum Security Facility, Based On The Final Detailed Architectural And Engineering Design, To Be Approved By The Head Of Procuring Entity Or Its Duly Authorized Representative Conformably With The Minimum Standards Set Forth In The (1) Presidential Decree (pd) No. 1096, National Building Code Of The Philippines (2) Batas Pambansa (bp)blg. 344, An Act To Enhance The Mobility Of Disabled Persons By Requiring Certain Public Buildings, Institutions, Establishments And Public Utilities To Install Facilities And Other Devices (3) National Structural Code Of The Philippines (nscp), Volume I, 2010 (4) Philippine Electrical Code (pec), 2009 (5) Revised Plumbing Code Of The Philippines (6) Revised Irr Of Ra 10575 (7) Republic Act (ra) No. 9514, Revised Fire Code Of The Philippines And (8) Applicable Local Regulations And Ordinances. Completion Of The Works Is Required Within Three Hundred Sixty-five (365) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project Amounting To At Least Fifty Percent (50%) Of The Abc Within The Last Six (6) Years. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act.” Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Cooperatives, And Partnerships Or Organizations With At Least Seventy-five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From Bureau Of Corrections And Inspect The Bidding Documents At The Address Given Below From Monday To Friday From 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On _december 28, 2024 (08:00am To 05:00pm) To January 20, 2025 (01:29 Pm)_____ From The Given Address And Website(s) Below. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity Bucor.gov.ph, Provided That Bidders Shall Pay The Applicable Fee Of Fifty Thousand (₱50,000.00) Pesos Only For The Bidding Documents Not Later Than The Submission Of Their Bids. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person Or By Facsimile. 6. The Bureau Of Corrections Will Hold A Pre-bid Conference On _january 06, 2025 (01:30pm)__ At Bac Conference Room Nbp Reservation Muntinlupa City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below, On Or Before __january 20, 2025 (01:30pm)_____. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 9. Bid Opening Shall Be On __january 20, 2025 (01:30pm)____ At The Bac Conference Room Nbp Reservation Muntinlupa City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Bureau Of Corrections Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Ma. Adoracion I. Viñas Office Of The Bac Secretariat Supply Office, Bureau Of Corrections, Muntinlupa City Tel # 02-8809-8587/02-8478-0907 Bacsec2022@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Bucor.gov.ph Date Of Issue: _______________ Ccsupt Celso S Bravo Chairperson, Bids And Awards Committee Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Bureau Of Corrections Invites Bids For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf), With Project Identification Number__________________. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 2025 In The Amount Of Three Hundred Million Pesos Only (₱300,000,000.00). 2.2. The Source Of Funding Is: Nga, The National Expenditure Program 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. [if Procuring Entity Has Determined That Subcontracting Is Allowed During The Bidding, State:] The Bidder Must Submit Together With Its Bid The Documentary Requirements Of The Subcontractor(s) Complying With The Eligibility Criteria Stated In Itb Clause 5 In Accordance With Section 23.4 Of The 2016 Revised Irr Of Ra No. 9184 Pursuant To Section 23.1 Thereof. 7.2. [if Subcontracting Is Allowed During The Contract Implementation Stage, State:] The Supplier May Identify Its Subcontractor During The Contract Implementation Stage. Subcontractors Identified During The Bidding May Be Changed During The Implementation Of This Contract. Subcontractors Must Submit The Documentary Requirements Under Section 23.1 Of The 2016 Revised Irr Of Ra No. 9184 And Comply With The Eligibility Criteria Specified In Itb Clause 5 To The Implementing Or End-user Unit. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address At Bac Conference Room Nbp Reservation Muntinlupa City And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty (120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Architectural, Engineering Design, Detailed Engineering Requirements And Construction Of Building With Concreting Works. 7.1 Subcontracting Is Not Allowed 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: For Design Personnel: Key Personnel General Experience Relevant Experience Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience. Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience. Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years’ Experience. Experience In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel: Key Personnel General Experience Relevant Experience Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience. Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. Foreman The Foreman Must Have At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Safety Officer The Sanitary Officer Must Have At Least Two (2) Years’ Experience. Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units Backhoe At Least 38hp With 0.055 To 0.160 M3 Bucket Capacity 1 Pay Loader At Least 2.5 To 9.5 M3 Bucket Capacity 1 Dump Truck At Least 10 Cu.m. 2 Generator 50kva 1 Concrete Mixers 1 Bagger 4 Welding Machines 300amp Heavy Duty 4 Submersible Dredging Pump At Least 1hp And 2” Output 1 Prospective Bidders Shall Attach The List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be. 12 No Further Instructions. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than 2% Of The Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less Than 5% Of The Abc, If Bid Security Is In Surety Bond. 19.2 No Further Instructions. 20 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its; 1. Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) 2. Supporting Documents For The Slcc (notice Of Award And/or Notice To Proceed And Project Owner’s Certificate Of Final Acceptance Issued By The Owner Other Than The Contractor Or The Constructors Performance Evaluation System (cpes) Final Rating, Which Must Be At Least Satisfactory. In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted) 3. Certified True Copy Coming From The Issuing Agency Of Valid And Current Registration Certificate (sec Certificate Of Registration For Corporation Or Dti Certificate Of Registration For Sole Proprietorship Or Cda Certificate Of Registration For Cooperative) 4. Valid And Current Mayor’s Or Business Permit 5. Valid And Current Tax Clearance 6. Valid And Current Pcab License And Registration 7. Audited Financial Statement 8. Three (3) Sets Photocopy Of Eligibility And Financial Envelope Duly Marked As “copy No.1”, “copy No.2” And “copy No.3” 21 No Further Instructions. Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property (ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Special Conditions Of Contract Gcc Clause 2 Sectional Completion Is Not Applicable The Intended Completion Date Is Three Hundred Sixty-five (365) Calendar Days From The Date Of Receipt Of The Ntp. 4.1 The Procuring Entity Shall Give Possession Of All Parts Of The Site To The Contractor From The Date Of The Receipt Of Notice To Proceed (ntp). 6 No Further Instructions. 7.2 Fifteen (15) Years. 10 No Dayworks Are Applicable To The Contract. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is One Tenth Of One Percent Of The Total Contract Price. 13 The Amount Of The Advance Payment Is Fifteen Percent (15%) Of The Contract Price Upon Submission To And Acceptance By The Bureau Of Corrections Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, A Bank Guarantee Or A Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission And Confirmed By The Bureau Of Corrections. 14 The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15.1 The Date By Which “as Built” Drawings Are Required Is Upon Actual Completion Of The Project. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Equivalent To Five Percent (5%) Of The Contract Price. Section Vi. Specifications Terms Of Reference Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Sablayan Prison And Penal Farm, Occidental Mindoro 1. Project Information 1.1 Project Description The Mission Of The Bucor Is To Protect Society By Confining Offenders In The Controlled Environments Of Prisons And Community-based Facilities That Are Safe, Humane, Cost-efficient, And Appropriately Secure, And That Provide Self-improvement Opportunities To Assist Offenders In Becoming Law-abiding Citizens. The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Shall Be Conducive To The Reformation And Rehabilitation Of Inmates That Will Bring Them Back Into The Mainstream Of Society As Useful Citizens Of The Country. The Contract Will Involve The Design And Build Scheme Leading To The Construction Of The Bureau Of Corrections Super Maximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm, Sablayan, Occidental Mindoro. The Plans And Designs Shall Be In Accordance With The Plan Of The Said Structures As Conceptualized By The Bucor Planning And Design Division Or As Conceptualized By The Winning Bidder If The Latter Is Found To Be Superior (as Defined In Section 3.1.1 Of This Tor). Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bureau Of Corrections Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Bucor Super Maximum Prison Facility (phase 2) Shall Be Constructed As Per Approved Drawings, Specifications, Bill Of Materials, Scope Of Works And The General Contract Conditions Following The Guidelines As Per Annex G Of Irr Of Ra 9184. This Project Aims To Be Completed Within A Year, Aligning With Our Decongestion Program. This Expedited Timeline Underscores Our Commitment To Addressing Urgent Needs Within The Correctional System And Providing Timely Solutions For The High Risk Committed Pdl. The Plans And Designs Shall Be In Accordance With The Plan Of The Said Structures As Conceptualized By The Planning And Design Division (pdd) Under. Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Construction Of Super Maximum-security Facility Shall Be Constructed As Per Approved Drawings, Specifications, Bill Of Materials, Scope Of Works And The General Contract Conditions Following The Guidelines As Per Annex G Of Irr Of Ra 9184. The Project Shall Have The Following Basic Components: A. Complete Detailed Architectural And Engineering Design Plans, Technical Specifications, And Design Calculations For The Construction Of The Project. Such Plans, Designs, And Technical Specifications Shall Be Subject For Review And Approval By The Bucor Pdd. The Design Development And The Contract Documents Phases Of The Design Shall Continue After The Bid Is Awarded. It Shall Likewise Be Subject For Review And Approval By The Director Of Directorate For Engineering Services (des). B. The Bid Shall Be Based On The Conceptual/schematic Design Drawings Prepared By The Bucor Pdd Or That Submitted By The Winning Bidder As Defined In Section 3.1.1 Of This Tor. C. The Contractor Shall Complete The Construction Of The Following Facility Component: I. One (1) Unit 2-storey“type B” Pdl Dormitory At Least 3190 Sq.m (gross Area) Polished Flooring And Sandwich Panel Roofing With The Capacity Of Atleast 340 Pdl, 2 Pdl Per Cell With Double Deck Bunk Bed (160 Cells), 1 Pdl Per Cell With Single Bed (20 Cells). The Dormitory To Include Complete Utilities, Power Supply, Cctv, Water Supply, Fire Protection; • Electrical System: Three-phase Power Line Supply, Connected From The Local Electric Utility (from Main Road/ Source To The Compound. The Power Line Shall Be Used For The Future Development Of The 50 Ha Facility. • Electrical System: Backup Power (three-phase Genset) Supply System With Capacity Not Less Than Total Computed Mva Load, Without Demand Factor (designed To Supply The Dormitory), And To Include Capacitor Bank, If Necessary; • Sewerage And Drainage Systems(pipelines To Cover From Project Site To Nearest Tapping Point); • Water Supply System With Sufficient Pressure To Provide The Water Requirement Of The Psdl. The System Is Oncomposed Of A Cistern Tank, Pumps, And An Overhead Water Storage Tank. Deep Well Source Water System (intake Box, Transmission Pipelines, Pressure Break Tanks, Chlorinator With Tanks And Accessories, Etc.) Whichever Is Deemed Most Suitable For The Facility And Is Authorized By The Lgu. • Fire Protection System (fire & Jockey Pump, Pump House), Fire Detection Alarm System And Fire Suppression Equipment Included In Dormitory. • Cctv Systems: To Install Cctv At Perimeter Fence To Monitor The Inside Compound And Dormitory To Monitor The Hallways And Blind Spots. Ii. 3 Meters Height Concrete Perimeter Security Fence With Concertina Above, To Cover 50 Hectares Area (plastered And Painted Finish); Iii. Primary And Secondary Fence For 1.8 Hectares Compound Including Gates, Catwalk And Post Towers (with Cr And Water Supply) (r.a. 10575 Rule 7). • 4 Meters Height Concrete Primary Perimeter Fence (with Catwalks, Concertina Wirings, Post Tower (with Cr And Water Supply) And Solar Lightings, (ra10575). • Secondary Perimeter Fence (3 Layer Concertina, Steel Mesh) With 300w Integrated Solar Light Every 3 Bays And (to Include Post Towers And Gates); Iv. Road Networks And Culverts • All Entry And Exit Point Of Any Bodies Of Water E.g. Creeks, Canals Shall Be Fenced Culvert By Metal Grills (non-corrosive); • The Project Has An Allocated Budget Sufficient To Cover At Least 1440 Sqm Of Road Construction Within The Prison Facility. While This Budget Allows For Road Development, Prioritization Shall Be Given To The Construction Of Culverts, Both Fenced And Road Culverts, To Ensure Adequate Drainage And Prevent Flooding. These Culverts Are Critical For The Road Leading From The Main Road To The Site, As Well As Along The Perimeter Of The Facility. To Accurately Assess The Project Scope And Design, Bidders Are Required To Conduct A Thorough Site Inspection To Identify And Evaluate All Necessary Culverts." 1.2 Contractual Framework The Contractual Arrangement To Be Used For The Project Is The Design-and-build (db) Scheme. Under This Scheme The Procuring Entity Awards A Single Contract For The Architectural/engineering Design And Construction To A Single Firm, Partnership, Corporation, Joint Venture Or Consortium. The Winning Contractor Shall Consult And Collaborate With The Bucor Pdd For The Preparation Of The Detailed Architectural Design Of The Project. The Detailed Architectural And Engineering Design Shall Be Subject For The Review And Approval By The Bucor Pdd. Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Obligations And Liabilities Of The Contractor And Its Architect Shall Be Joint And Solidary For Purposes Of The Detailed Architectural Design Of The Project In Accordance With Article 1723 Of The Civil Code Of The Philippines And Other Pertinent Laws. The Db Scheme Of Procurement Was Recommended, Endorsed, And Adopted Pursuant To The Annex G Of Irr Of Ra 9184. 2. Scope Of Contract 2.1 Obligations Of The Winning Bidder/contractor A. Render Architectural And Allied Engineering Design Services Including Final Schematic Design Necessary For The Implementation Of The Project. The Allied Engineering Design Services Shall Include, But Shall Not Be Limited To, Design For Architectural, Civil, Structural, Electrical, Mechanical, Plumbing, And Electromechanical. All Drawings Shall Be Generated Using Modern Modeling/drafting Software And Printed On High Quality 20” X 30” Blue Print Paper. B. Undertake Detailed Architectural And Engineering Designs (daeds) Using The Given Data Such As Topographic, Hydrographic And Cross–section Surveys, Geotechnical And Geological Investigation, And Hydrologic Investigation And Initial Schematic Design Or Design Concept Provided By The Bucor Pdd Which Conforms With The Minimum Performance Specifications And Standards (mpss); C. If Applicable, Secure Environmental Clearance Or An “environmental Compliance Certificate (ecc)”. If The Proposed Project Is Considered Outside The Purview Of The Philippine Environmental Impact Statement (eis) System, A Certificate Of Non- Coverage Or Certificate Of Exemption Shall Be Secured. D. The Project Shall Be Constructed According To The Daeds Prepared By The Winning Bidder And Approved By The Bucor And In Compliance With The Mpss As Well As Provided In Rule Vii, Section 7 Of The Irr Of Ra 10575. Likewise, Construction Includes Conformance To The Provisions Pertaining To Buildings Under The Latest Edition Of The Dpwh Standard Specifications For Public Works Structures, Volumes Ii And Iii (blue Book). The Blue Book Prescribes, Among Other Things, The Material Requirements And Construction Requirements For Different Items Of Work, Including The Tests To Be Conducted During Construction By The Dpwh-accredited Testing Laboratory. The Blue Book Incorporates Pertinent Provisions Of The American Society For Testing And Materials (astm) And American Concrete Institute (aci), Among Other Standards, Pertaining To Construction. Attention Shall Be Given To The Relevant Items Of Work In The Following Parts Of The Blue Book: Volume Ii ➢ Part A – Facilities For The Engineer ➢ Part B – Other General Requirements Volume Iii ➢ Part A – Earthwork ➢ Part B – Plain And Reinforced Concrete Works ➢ Part C – Finishing ➢ Part D – Electrical ➢ Part E – Mechanical ➢ Part I – Water Supply ➢ Part J – Flood Control And Drainage ➢ Part I-c – Drainage Works For Materials And Technologies Not Covered By The Blue Book, Or If The Proponent Intends To Use Any New Material/technology Which Is Not Accredited By The Dpwh Bureau Of Research And Standards (brs), The Proponent Shall Submit A Certification From A Recognized Foreign Or International Institution To The Effect That The New Materials Or Technology Meets The Mpss For This Project And Has Been Successfully Used In Existing Structures With Proven Integrity. The Winning Bidder Or Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Specified In Section 62.2 Of The Irr Of Ra 9184; And, F. The Winning Bidder Or Contractor Shall Be Solely Responsible For The Design And Shall Be Held Responsible For Any Default Resulted From Improper Design. Further, Extended Liability Of The Contractor Since It Stipulated That The Works, When Completed, Shall Be Fit For The Purpose For Which It Was Intended As Defined In The Contract. 2.2 Obligations Of The Bucor A. Provide Full Information On All Requirements For The Project; B. Approve The Winning Bidder Or Contractor’s Design Without Diminishing Their Full And Sole Responsibility For The Quality And Integrity Thereof; C. Give Prompt Written Notice Thereof To Winning Bidder Or Contractor, If It Observes Or Becomes Aware Of Any Defect In The Project; D. Designate, When Necessary, Representatives Authorized To Act On Its Behalf. It Shall Examine Documents Submitted By The Winning Bidder Or Contractor And Render Decisions Pertaining Thereto Promptly, To Avoid Unreasonable Delay In The Progress Of Their Work. It Shall Observe The Procedure Of Issuing Orders To The Winning Bidder Or Contractor; E. Supervise And Monitor The Implementation Of The Project; I. Construction Monitoring And Testing Forms: • The Use Of Construction Monitoring And Testing Forms That Will Be Provide By The Bucor - Nhq Pdd Is Mandatory Throughout The Duration Of Construction. • Oversight Of These Forms Will Be Conducted By The Engineering Services (es) Of The Sppf On Behalf Of The Bucor Pdd • Sppf-es To Impose To Contractor Testing Of All Items After Installation And/or Application. Es To Send Pdd Copy Of The Test Report/s. • Sppf-es To Monitor Material Delivery Of Contractor To Ensure All Materials Installed And/or Applied Are In Accordance With The Specifications Stated On Plans And Contract Of This Project. • In Case There Would Be Substitute Or Alternative To The Original Specification Of Material/s, Sppf- Es To Inform Pdd Of Such Variation. Ii. Bucor Engineer Visits: • Nhq Engineers And Architects (personnel Of Pdd) Will Conduct Site Visits On A Quarterly Basis Or Whenever Deemed Necessary To Ensure Compliance With Standards And Regulations. • Pdd Personnel To Witness The Final Testing And Commissioning Of The Systems, Equipment And Utilities Prior To Acceptance Of The Project Or Part Of The Project Thereof. Iii. Progress Billing Payment: • Sppf Es Engineers Will Provide Monthly Updates, Or As Deemed Necessary, On The Statement Of Work Accomplishment Based On The Actual Progress Of The Project, Including Reports Update. F. Pay The Accomplishment Accepted In The Conformance With The Mpss Included Under The Design And Build Contract. I. This Reports And Swa Updates Of The Ippf Es Will Be Reviewed And Approved By Pdd - Nhq Prior To Any Progress Billing Payments Being Made. 2.3 Bidding Documents The Bidding Documents For The Project Shall Govern The Conduct Of The Procurement Of The Project. 3. Scope Of Works 3.1 Planning And Design Phase 3.1.1 Preliminary Architectural Plan (pap) By Bidder The Approved Concept Design Shall Adopt The Provisions Indicated In Rule Vii, Section 7 Of The Irr Of Ra 10575. Bidders Shall Submit Also An Alternative Design Concept With Respect To The Actual Site Condition. This Alternative Design By The Winning Bidder Shall Be Adopted Should The Same Be Found To Be Superior Than The One Conceptualized By The Bucor Pdd. 3.1.2 Detailed Architectural And Engineering Design (daed) By The Winning Bidder During The Implementation Of The Project, The Winning Bidder Shall Prepare The Daed Of The Project And Submit The Same To The Bucor For Approval Prior To The Execution Of The Construction Works. The Winning Bidder Shall Prepare The Daed Based On Its Pap As Reviewed And Accepted By The Bucor Pdd And In Accordance With The Minimum Performance Standards And Specifications (mpss). The Daed Shall Be Undertaken With A Degree Of Accuracy That Will Allow Estimates To Be Made Within Approximately Plus Or Minus Five Percent (+/-5%) Of The Final Quantities. Once Approved By The Bucor, The Winning Bidder’s Daed Shall Form Part Of The Mpss. The Bucor-approved Daed, Together With The Mpss Provisions On Construction Under Section 2.0 Hereof, Shall Govern The Actual Construction Undertaken By The Winning Bidder. The Winning Bidder Shall Undertake The Necessary Field Surveys And Investigation In Accordance With The Dpwh Design Guidelines. In Carrying Out These Works, The Winning Bidder Shall Ensure That The Engineering, Environmental, Particularly During Field Investigations And The Development Of The Preliminary And Final Detailed Engineering Designs. The Winning Bidder Shall Ensure That All Designs Submitted For Approval Have Fully Taken Into Account Key Findings From The Engineering, Environmental, And That Negative Environmental Impacts Have Been Minimized Or Eliminated To The Fullest Extent Possible. 3.1.3 Architectural And Engineering Design Submittals I. Architectural Design A. The Building Should Be Designed With Structural, Electrical, Natural Or Combine Ventilation And Natural Lighting Following Building Design Standards. B. The Prospective Bidder Shall Prepare The Preliminary Architectural Plans In Accordance With The Requirements Of The National Building Code Of The Philippines, Accessibility Law (bp 344) Including All Other Applicable Laws And Local Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Site Development Plan 2. Vicinity Map 3. Perspective 4. Floor Plans 5. Elevations A. Front Elevation B. Rear Elevation C. Right Elevation D. Left Elevation 6. Sections A. Longitudinal Section B. Cross Section 7. Doors & Window Schedule 8. Plans And Details Of Stairs And Ramps 9. Schedule Of Finishes For Floors, Walls And Ceiling 10. Miscellaneous Details Ii. Structural Design A. The Proponent Shall Prepare The Necessary Structural Analysis/calculation And Design Of The Structural Members Of The Building Component In Accordance With The National Building Code Of The Philippines With Its Referral Codes Such As The Latest National Structural Code Of The Philippines. The Design For The Structure Shall Take Into Account, Among Other Things, The Seismic Requirements Of The Area To Determine The Optimum Safety Of The Whole Structure And To Minimize Possible Earthquake Damage. B. On The Basis Of The Data Obtained From The Detailed Site Investigations, Topographical/soil And Survey, Geotechnical Engineering, Foundation Investigation, Material Testing, Survey Of Existing Site Conditions, The Seismic Requirements Of The Area, The Load Requirements Of The Building And Other Investigation Required To Obtain The Data Necessary To Ensure The Safety Of The Structure, The Proposal Shall Prepare The Preliminary Structural Design Plans Of The Structure. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Structural Design Criteria And Design Notes 2. Foundation Plan 3. Floor Framing Plans 4. Schedule Of Slab, Beams And Girders 5. Schedule Of Columns 6. Schedule Of Footings 7. Structural Details Of Stairs/ramp, If Applicable 8. Roof Framing Plan, If Applicable 9. Schedule And Details Of Trusses, If Applicable 10. Road Design And Details (if Applicable) 11. Miscellaneous Details Iii. Sanitary/plumbing Design A. General • The Detailed Design Shall Conform To The General Standards Adopted By The Sanitary & Plumbing Code Of The Philippines And Other Pertinent Laws And Ordinances. • All Design Considerations/assumptions Shall Be Based On The Results Of The Technical Studies, Detailed Analyses, And Design Computations. • The Technical Drawings And Specifications Shall Clearly Indicate All The Details Required To Ascertain The Care And Thoroughness Devoted In The Preparation Of The Drawings. B. Drainage And Sewerage • The Drainage Layout Shall Show All The Required Information Such As Direction Of Flow, Manhole-to-manhole Distances, And Sizes Of Lines, Manholes/canals, Location Of Outfalls, Etc. • The Prospective Bidder Shall Prepare A Design For The Sewage Treatment Plant In Accordance To The Clean Water Act Of 2004 (republic Act No. 9275) And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Sewer, Vent And Storm Drainage Layout 4. Enlarged Toilet Plan For Common And Pwd Toilets 5. Isometric Diagram 6. Miscellaneous Details 7. Drainage And Sewerage System 8. Three Chamber Septic Tank Plans And Details C. Water Supply And Distribution System • The Proponent Shall Carry Out A Preliminary Detailed Design For The Water Supply Of The Project. The Design Should Be On The Basis Of The Source And Volume Of Water Supply, Water Consumption, Piping Network, And Conveyance In Accordance With The Applicable Laws, Rules And Regulations Governing Health, Safety And Sanitation. • The Contractor Shall Install Elevated Water Storage/s Per Unit Located At The Roof Deck Of The Prison Dormitories. (sufficient Capacity To Supply The Pdl) Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Water Line Layout 4. Water Line Isometric Diagram 5. Water Reservoir Plans And Details 6. Miscellaneous Details Iv. Electromechanical Design A. Sewage Treatment Plant • The Prospective Bidder Shall Prepare A Design For The Sewage Treatment Plant In Accordance To The Clean Water Act Of 2004 (republic Act No. 9275) And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Electrical System Layout 4. Mechanical System Layout 5. Instrumentation And Control System Diagrams 6. Piping And Instrumentation Diagrams (p&ids) 7. Equipment Details And Specifications 8. Electrical Power Distribution 9. Emergency Power Systems 10. Grounding And Lightning Protection 11. Control And Monitoring Systems, If Applicable 12. Safety Systems 13. Miscellaneous Details B. Fire Protection System • The Prospective Bidder Shall Prepare A Design For The Fire Protection System In Accordance To The Fire Code Of The Philippines, (irr) Of Ra 9514, And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Sprinkler System 2. Sprinkler System Isometric Diagram 3. Fire Fighting Piping System Diagram 4. Fire Alarm System Layout 5. Fire Suppression System Layout 6. Smoke Management System Layout 7. Fire Pump And Water Supply 8. Miscellaneous Details V. Electrical Design A. The Prospective Bidder Shall Prepare A Preliminary Design Plan For The Electrical And Power Supply System Of The Building In Accordance With The Electrical Code Of The Philippines, Fire Code Of The Philippines, National Building Code Of The Philippines And Other Relevant Laws And Ordinances. B. The Prospective Bidder Shall Prepare A Design For The Electrical And Power Supply System Considering Ease Of Maintenance And Prevention Of Illegal Connections Including Electrical Supply For Ceiling Fans. C. The Prospective Bidder Shall Prepare A Design For Backup Power Generator With Capacity Not Less Than Total Computed Kva Load Without Demand Factor. D. 3-phase Electrical Supply Shall Be Sourced From The Local Electrical Utility. E. Power Line Connection From Main Source To The Facility Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Power Riser Diagram 2. Power Layout System 3. Lighting Layout System 4. Local Area Network System, If Applicable 5. Grounding System 6. Load Schedules 7. Others As Applicable Vi. Other Requirements  Technical Specifications  Boring Test  Structural Design And Analysis And Computation  Final Design And Construction Plans  Upon Award Of Contract, The Contractor Shall Comply The Following: O Prepare Final Draft Of Architectural And Engineering Design Plans Incorporating All Design Refinements And Revisions Based On Project Requirement Or As May Be Required By The Bucor Pdd Within The Scope Of Design. O Submit To The Bucor Design And Build Committee (bucor-dbc) The Final Architectural And Engineering Design Plans And Specifications Duly Signed And Sealed By The Concerned Professional Architect, Engineers, Incorporating All The Necessary Revisions And Refinements For Approval By The Head Of Procuring Entity. 3.2 Construction Phase The Following Works Shall Comprise This Phase: I. Permits And Clearances, The Contractor Shall Upon Authorization Of The Head Of The Procuring Entity (hope), Make Representations With The Government Agencies Concerned To Expedite The Processing Of The Necessary Permits And Certificates Such As The Following: A. Zoning Certification And Locational Clearance B. Building /electrical/sanitary Permits C. Certificate Of Occupancy D. Environmental Clearance Certificate E. All Other Permits/clearances As May Be Required For The Construction. Ii. Mobilization, The Contractor Shall Mobilize All The Required Project Team Personnel, Equipment, Tools, And Manpower With The Required Skills And In Sufficient Number As May Be Necessary For His Efficient Undertaking Of The Project. Iii. Clearing, Grubbing And Hauling/disposal Of Debris Iv. Construction Stage As A Rule, Contract Implementation Guidelines For Procurement Of Infrastructure Projects Shall Comply With Annex “e” Of The Revised Irr Of Ra 9184. The Following Provisions Shall Supplement These Procedures: I. No Works Shall Commence Unless The Contractor Has Submitted The Prescribed Documentary Requirements And Implementing Unit Has Given Written Approval. Work Execution Shall Be In Accordance With Reviewed And Approved Documents. Ii. The Contractor Shall Be Responsible For Obtaining All Necessary Information As To Risks, Contingencies And Other Circumstances Which May Affect The Works And Shall Prepare And Submit All Necessary Documents Specified By The Implementing Unit To Meet All Regulatory Approvals As Specified In The Contract Documents. Iii. The Contractor Shall Submit A Detailed Program Of Works Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) For Approval By The Head Of The Procuring Entity (hope) That Shall Include, Among Others: A. The Order In Which It Tends To Carry Out The Work Including Anticipated Timing For Each Stage Or Design/detailed Engineering And Construction; B. Periods For Review Of Specific Outputs And Any Other Submissions And Approvals; C. Sequence Of Timing For Inspection And Tests; D. General Description Of The Design And Construction Methods To Be Adopted; E. Number Of Personnel To Be Assigned For Each Stage Of The Work; F. List Of Equipment Required On Site For Each Stage Of The Work; And G. Description Of The Quality Control System To Be Utilized For The Project. Iv. Any Errors, Omissions, Inconsistencies, Inadequate Or Failure Submitted By The Contractor That Do Not Comply With The Requirements Shall Be Rectified, Resubmitted And Reviewed At The Contractor’s Cost. If The Contractor Wishes To Modify Any Design Or Document Which Has Been Previously Submitted, Reviewed And Approved, The Contractor Shall Notify The Implementing Unit Within A Reasonable Period Of Time And Shall Shoulder The Cost Of Such Changes. V. As A Rule, Changes In Design And Construction Requirements Shall Be Limited Only To Those That Have Not Been Anticipated In The Contract Signing And Approval. The Following Guidelines Shall Govern Approval For Change Or Variation Order: A. Change Orders Resulting From Design Errors, Omissions Or Non-conformance With The Performance Specifications And Parameters And The Contract Documents By The Contractor Shall Be Implemented By The Contractor At No Additional Cost To The Bureau Of Corrections. B. Provided That The Contractor Suffers Delay And/or Incurs Costs Due To Changes Or Errors In The Preparation Of Performance Specification And Parameters, The Contractor Shall Be Entitled To Either One Of The Following:  An Extension Of Time For Any Such Delays Under Section 10 Of Annex “e” Of Irr-a (ra9184; Or  Payments For Such Cost As Specified In The Contract Documents, Provided That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. C. The Contract Documents Shall Include The Manner And Schedule Of Payment Specifying The Estimated Contract Amount And Installments In Which The Contract Will Be Paid. D. The Contractor Shall Be Entitled To Advance Payment Subject To The Provisions Of Section 4 Of Annex “e” Of The Revised Irr Of Ra 9184. E. The Implementing Unit Shall Monitor The Quality Control Procedures For The Design And Construction In Accordance With The Government Guidelines And Shall Issue The Proper Certificates Of Acceptance For Sections Of The Works Or Whole Of The Works As Provided For In The Contract Documents. F. The Contractor Shall Provide All Necessary Equipment, Personnel, Instruments, Documents And Others To Carry Out Specified Tests. G. This Design And Build Project Shall Have Minimum Defects Liability Period Of One (1) Year Contract Completion Or As Provided In The Contract Documents. This Is Without Prejudice To The Liabilities Imposed Upon The Engineer/architect Who Drew Up The Plans And Specification For A Building Sanctioned Under Section 1723 Of The New Civil Code Of The Philippines. H. The Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Of 15 Years For Permanent Structures/buildings And 5 Years For Roads As Specified In Section 62.2.2 Of The Revised Irr Of Ra 9184 V. As-built Plans. The Contractor Shall Cause The Preparation And Submission Of As-built Plans Duly Signed And Sealed By All Concerned Parties Involved In The Construction In The Same Sheet Size And Scale As The Original Drawings In One (1) Blue Print Copy And One (1) Reproducible Copy. Vi. General Requirements: 1. Temporary Facilities Such As Field Offices For The Bucor Inspectorate Team, Project Engineers And Quarters For Laborers; Temporary Warehouse For The Construction Material. 2. Office Furniture And Equipment, Survey Equipment And Consumables 3. Photographs: This Item Consists Of The Supply Of Equipment And Materials, I.e., Album, Necessary To Undertake Photographic Progress Activities Of The Project And Of All Cost Incidental To The Preparation And Submission Of Photographs (at Least 12 Photographs Per Day). The Quantities For Photographs Shall Be One (1) Set Of Photographs Per Month. 4. Health And Safety Program Including Personal Protective Equipment (ppe) A. All Standard Safety Measures And Precautions Shall Be Exercised By The Contractor In The Course Of The Project For The Protection Of The Public And Its Workers And In Conformity With Dole Department Order No. 13, Series Of 1998. B. All Workers Shall Be Equipped With Proper Working Uniform And Identification At All Times. They Must Be Registered With The Governing Bucor Security Office And Must Comply With The Bucor’s Rules And Regulations. C. The Contractor Shall Secure His/her Own Equipment And Materials On Site. The Bucor Shall Not Be Liable To Any Losses Incurred During The Progress Of The Work. 5. Minimum Heavy Equipment Requirement (as Needed) For Site Development Such As: No. Item Specification 1. Backhoe 0.8 Cu. M. 2. Backhoe Wheel Mounted With Breaker 0.90 Cu. M. 3. Cargo/service Truck 2-5 Mt., 160 Hp 4. Dump Truck 12 Cu. Yd. 5. Motorized Road Grader G710a, 140hp 6. Payloader 1.5 Cu. M. 7. Vibrator Roller 10 Mt 8. Bulldozer 170 Hp 9. Scraper 515 Hp 10. Truck Mounted Crane, Hydraulic Telescopic Bommer Capacity: 41 – 45 Mt. 11. Crawler Crane 41-45 Mt 12. Generator Set 300 Kw/375 Kva 13. Water Pump 100mm Suction Dia. 14. One Bagger Mixer 4-6 Ft3/min 15. Concrete Vibrator Ey20, 5hp, 32-70mm 16. Vibro Hammer 45000 Kg-m 17. Excavator 17.5 Kw Or Any Specify Types Of Heavy Equipment Needed For A Site Development Will Be Determined By The Winning Bidder. 6. Environmental Compliance 7. Communication Equipment: This Item Consists Of The Provision Of Communication Equipment. 8. Billboard 9. Traffic Management (if Applicable). Vii. Building Construction 1 Lot One (1) Unit 2-storey“type B” Pdl Dormitory At Least 3190 Sq.m (gross Area) Polished Flooring And Sandwich Panel Roofing With The Capacity Of Atleast 340 Pdl, 2 Pdl Per Cell With Double Deck Bunk Bed (160 Cells), 1 Pdl Per Cell With Single Bed (20 Cells). The Dormitory To Include Complete Utilities, Power Supply, Cctv, Water Supply, Fire Protection; • Electrical System: Three-phase Power Line Supply, Connected From The Local Electric Utility (from Main Road/ Source To The Compound. The Power Line Shall Be Used For The Future Development Of The 50 Ha Facility. • Electrical System: Backup Power (three-phase Genset) Supply System With Capacity Not Less Than Total Computed Mva Load, Without Demand Factor (designed To Supply The Dormitory), And To Include Capacitor Bank, If Necessary; • Sewerage And Drainage Systems(pipelines To Cover From Project Site To Nearest Tapping Point); • Water Supply System With Sufficient Pressure To Provide The Water Requirement Of The Psdl. The System Is Composed Of A Cistern Tank, Pumps, And An Overhead Water Storage Tank. Deep Well Source Water System (intake Box, Transmission Pipelines, Pressure Break Tanks, Chlorinator With Tanks And Accessories, Etc.) Whichever Is Deemed Most Suitable For The Facility And Is Authorized By The Lgu. • Fire Protection System (fire & Jockey Pump, Pump House), Fire Detection Alarm System And Fire Suppression Equipment Included In Dormitory. • Cctv Systems: To Install Cctv At Perimeter Fence To Monitor The Inside Compound And Dormitory To Monitor The Hallways And Blind Spots. 1 Lot 3 Meters Height Concrete Perimeter Security Fence With Concertina Above, To Cover 50 Hectares Area (plastered And Painted Finish); 1 Lot Primary And Secondary Fence For 1.8 Hectares Compound Including Gates, Catwalk And Post Towers (with Cr And Water Supply) (r.a. 10575 Rule 7). • 4 Meters Height Concrete Primary Perimeter Fence (with Catwalks, Concertina Wirings, Post Tower (with Cr And Water Supply) And Solar Lightings, (ra10575). • Secondary Perimeter Fence (3 Layer Concertina, Steel Mesh) With 300w Integrated Solar Light Every 3 Bays And (to Include Post Towers And Gates); 1 Lot Road Networks And Culverts • The Project Has An Allocated Budget Sufficient To Cover At Least 1440 Sqm Of Road Construction Within The Prison Facility. While This Budget Allows For Road Development, Prioritization Shall Be Given To The Construction Of Culverts, Both Fenced And Road Culverts, To Ensure Adequate Drainage And Prevent Flooding. These Culverts Are Critical For The Road Leading From The Main Road To The Site, As Well As Along The Perimeter Of The Facility. • All Entry And Exit Point Of Any Bodies Of Water E.g. Creeks, Canals Shall Be Fenced Culvert By Metal Grills (non-corrosive); • To Accurately Assess The Project Scope And Design, Bidders Are Required To Conduct A Thorough Site Inspection To Identify And Evaluate All Necessary Culverts. A. Material Specifications: A. Floor Finishes • Polished Cement Finish Prison Cell, Hallways, Staircases, And Rooms • Plain Cement Finished - Pathways. • Ramps - Anti Slip Pavers Or Tiles • Crs – Unglazed Ceramic Tiles B. Wall Finishes A. Glazed Wall Tiles - 1.8m Height. B. Plain Cement Plaster Finish - For All Buildings And Facilities C. Ceiling Finishes C. Concrete Steel Decking, If Applicable. – Coated In White Enamel D. Painting D. Semi-gloss Solvent Paint Top Coat (high-end Quality) For Interior And Exterior Walls In Two To Three Coats Application. Apply Concrete Neutralizer For Newly Finished Concrete Surfaces. Use Solvent Primer. E. Varnish Paint Finish With Weather Proof Coating – For Doors And Jambs Branded, High-end Quality (offices, Etc.), All Wooden Doors Must Have Secondary Steel Doors. F. Use Epoxy Paint Primer. Epoxy Paint Finish – For Structural Steel And All Metal Works E. Doors And Windows G. No Doors For Prison Facility Comfort Rooms With 1.20 Meter Finish Wall Height (see Rule Vii, Section 7 R-irr Of Ra 10575). H. Steel Doors And Grills – For Dormitories, Gates And Other Security Areas. Sliding Doors For All Cells (see Rule Vii, Section 7 R-irr Of Ra 10575) F. Waterproofing I. Uv Resistant Polyurethane Waterproofing – For All Roof Deck With Topping Works Provided With Welded Wire Mesh. (at Elevated Water Tank Area) J. Cistern - Polyurethane Waterproofing G. Plumbing Works K. Upvc Pipe Series 1000 – For All Soil, Sewer, Waste, Dry And Wet Vent Piping High-end Quality L. Pprc Fusion Type – For All Water Lines High-end Quality M. Contractor Encouraged To Adapt: Lpf Flush Valve For Water Closet Or Stainless Toilet-lavatory Combination. Waterless Urinals N. Sprinkler System To All Prison Dormitories In Accordance With The Provisions Of Revised Plumbing Code Of The Philippines. O. Contractor To Provide A Water System To Supply The Facility 4. Approved Budget For The Contract (abc) The Approved Budget For The Contract (abc) Is Php 300,000,000. This Is The Ceiling For Acceptable Bids. Bids Higher Than Abc Shall Be Automatically Rejected. 5. Proposed Implementation Schedule (example): No. Of Months 1 2 4 5 6 7 8 9 10 11 12 Design Phase Construction Phase 6. Eligibility Criteria For Bidders 6.1 General The Eligibility Requirements For This Design And Build Project Shall Adopt The Provisions Of Annex “g” Of The Implementing Rules And Regulations Of Ra 9184 (e.g. Eligibility Requirement). However, If A Bidder Who Has No Experience In Db Project On Its Own May Opt To Enter A Subcontracting Agreement, Partnership, Or Joint Venture With A Design Or Engineering Firm For The Design Portion Of The Project. 6.2 Legal Requirements A. Valid Contractor’s License Issued By The Philippine Contractor’s Accreditation Board B. Valid License Of The Contractor’s Designer Issued By The Professional Regulation Commission. 6.3 Technical Requirements A. The Contractor’s Designer Must Have Designed One Structure Similar To The Project At Hand With A Construction Cost Of At Least 50 % Of The Abc. 6.4 Financial Requirements The Contractor Must Have A Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc To Be Bid Or Equivalent To Php300,000,000.00. 7. Contents Of The Bid 7.1 In The First Envelope Class “a” Documents Legal Documents I. Philgeps Certificate Of Registration And Membership In Accordance With Section 8.5.2 Of This Irr. For Procurement To Be Performed Overseas, It Shall Be Subject To The Guidelines To Be Issued By The Gppb. (a) Ii. Pcab License And Registration, In Case Of Jv; 57 Iii. Statement Of All Ongoing Government And Private Contracts; Iv. Statement Of Slcc; V. Nfcc Computation; Vi. Jva, If Applicable; Vii. Bid Security In The Prescribed Form, Amount And Validity Period; Viii. Project Requirements, Which Shall Include The Following: 1. Organizational Chart For The Contract To Be Bid; 2. List Of Contractor’s Personnel (design And Construction), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; 3. List Of Contractor’s Equipment Units Which Are Owned, Leased And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From Lessor/vendor For The Duration Of The Project. Ix. Omnibus Sworn Statement By The Prospective Bidder Or Its Authorized Representative In The Prescribed Format; X. Submission Of Preliminary Conceptual Design Plans: Class “b” Documents I. For Infrastructure Projects, Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And It’s Irr. Ii. Each Partner Of The Joint Venture Shall Submit Their Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. 1. Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) A. Location Plan/vicinity Map B. Perspective C. Floor Plans D. Front View Elevation E. Rear View Elevation F. Left Side View Elevation G. Right Side View Elevation H. Longitudinal Section I. Transverse Section 2. Design And Construction Method 3. List Of Contractor’s Personnel To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc), Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; For Design The Key Professionals And The Respective Qualifications Of The Design Personnel Shall Be As Follows: • Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. • Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. • Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Ten (5) Years’ Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel The Key Professionals And The Respective Qualifications Of The Construction Personnel Shall Be As Follows: • Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. • Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. • Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. • Foreman The Foreman Must Have At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Safety Officer The Safety Officer Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) And Must Have At Least Two (2) Years’ Experience. 4. Value Engineering Analysis Of Design And Construction. The Second Envelope (financial Proposal) Shall Contain All The Required Documents For Infrastructure Projects Under Section 25.38 Of The Irr Of R.a 9184. 7.2 In The Second Envelope – Financial Proposal The Contents Of Financial Proposal – In The Second Envelope Shall Be Governed By Section 6.1 Design And Build Scheme Of The Dpwh Procurement Manual Volume Ii - Infrastructure Main Guidelines (2016). A. Lump Sum Bid Prices, Which Shall Include The Detailed Engineering Cost, In The Prescribed Bid Form Inclusive Of Vat B. Detailed Estimates Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals Used In Coming Up With The Bid For The Following: I Detailed Architectural And Engineering Design; Ii Demolition Works; And Iii Building Construction/civil Works. C. Bill Of Quantities D. Cash Flow And Payments Schedule. 8. Procedure And Criteria For Bids Evaluation For The Detailed Evaluation Of The Design And Build Proposals A Two-step Procedure Shall Be Adopted By The Bac, Which May Be Undertaken With The Assistance Of The Dbc. First-step Procedure: With The Assistance Of The Bucor Design And Build Committee (bucor-dbc), The Bac Shall Conduct The Opening, Preliminary Examination And Detailed Evaluation Of The Design And Build Proposals, As Follows: (1) The First Step Of The Evaluation Shall Involve The Review Of The Preliminary Conceptual Designs And Track Record Submitted By The Contract As Indicated In The Bidding Documents Using A Nondiscretionary “pass/fail” Criteria That Involve Compliance With The Following Requirements: A. Performance Specifications And Parameters And Degree Of Details; B. Adherence Of Preliminary Design Plans To The Required Concept Of Approach And Methodology For Detailed Engineering, Design And Construction With Emphasis On The Clarity, Feasibility, Innovativeness And Comprehensiveness Of The Plan Approach, And The Quality Of Interpretation Of Project Problems, Risks, And Suggested Solutions; And C. Quality Of Personnel To Be Assigned To The Project Which Covers Suitability Of Key Staff To Perform The Duties Of The Particular Assignments And General Qualifications And Competence Including Education And Training Of The Key Staff. 8.1 Merit Point Critera For The Bid Evaluation 8.1.1 Adherence To Performance Specifications (35 Points) A. Compliance And Adherence To Specifications: Excellent Compliance (100 Points): The Submission Fully Adheres To All Specified Project Requirements And Regulations, Demonstrating Meticulous Attention To Detail And Comprehensive Understanding Of The Tor. All Drawings And Documentation Are Accurate, Complete, And In Compliance With Relevant Standards. Good Compliance (80 Points): The Submission Largely Complies With Project Specifications And Regulations, With Minor Discrepancies. Drawings And Documentation Are Mostly Accurate And Complete, Meeting The Majority Of Requirements. Acceptable Compliance (70 Points): The Submission Satisfies Most Of The Specified Requirements And Regulations, Albeit With Some Notable Omissions Or Inconsistencies. Drawings And Documentation Are Generally Accurate And Complete, Meeting The Basic Expectations. Some Reservations (50 Points): The Submission Partially Meets The Specified Requirements And Regulations, With Several Notable Deficiencies Or Inconsistencies. There Are Significant Gaps Or Inaccuracies In The Drawings And Documentation, Raising Concerns About Compliance. Serious Reservations (20%) The Submission Falls Significantly Short Of Meeting The Specified Requirements And Regulations, With Major Deficiencies Or Inconsistencies. Drawings And Documentation Lack Essential Details Or Fail To Comply With Key Standards, Casting Doubt On The Bidder's Understanding Of The Project Scope. Unacceptable (0%) The Submission Fails To Comply With The Specified Requirements And Regulations, Lacking Essential Details And Demonstrating A Fundamental Misunderstanding Of The Project Scope. Drawings And Documentation Are Incomplete Or Inaccurate, Indicating A Lack Of Capability To Deliver The Project On Time. B. Functionality And Efficiency: Excellent (100%): The Design Optimally Utilizes Space, Facilitating Efficient Accommodation Of 500 Psdl. Layout And Design Enhance Operational Flow, Demonstrating Exceptional Foresight And Planning. Integration Of Facilities Promotes Smooth Prison Management. Good (80%): The Design Effectively Utilizes Space, With Minor Areas For Improvement In Operational Flow. Layout And Design Contribute To Efficient Prison Management, Meeting Most Functional Requirements. Acceptable (70%): The Design Adequately Utilizes Space, Meeting Basic Requirements For Accommodating 500 Psdl. Layout And Design Support Operational Flow, Though Some Improvements Are Needed For Optimal Functionality. Some Reservations (50%): The Design Partially Optimizes Space Utilization, With Notable Deficiencies In Operational Flow. Layout And Design Hinder Efficient Prison Management, Requiring Significant Adjustments For Improvement. Serious Reservations (20%): The Design Inadequately Utilizes Space, Hindering Accommodation Of 500 Psdl. Layout And Design Severely Impede Operational Flow, Indicating A Lack Of Understanding Of Functional Requirements. Unacceptable (0%): The Design Fails To Optimize Space Utilization, Lacking Consideration For Accommodating 500 Psdl. Layout And Design Pose Significant Obstacles To Efficient Prison Management, Indicating A Fundamental Misunderstanding Of Functional Requirements. C. Safety And Security: Excellent (100%): The Design Features Robust Perimeter Walls, Guard Towers, And Security Features Ensuring Optimal Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Highly Reliable, With Comprehensive Safety Measures For Both Psdl And Staff. Good (80%): The Design Incorporates Effective Perimeter Walls, Guard Towers, And Security Features, With Minor Areas For Enhancement. Fire Protection And Detection Systems Are Reliable, With Adequate Safety Measures For Psdl And Staff. Acceptable (70%) The Design Includes Satisfactory Perimeter Walls, Guard Towers, And Security Features, Meeting Basic Requirements For Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Functional, With Sufficient Safety Measures For Psdl And Staff. Some Reservations (50%): The Design Features Partially Effective Perimeter Walls, Guard Towers, And Security Features, With Notable Deficiencies In Pdl Containment And Facility Security. Fire Protection And Detection Systems Lack Reliability, With Limited Safety Measures For Psdl And Staff. Serious Reservations (20%): The Design Lacks Effective Perimeter Walls, Guard Towers, And Security Features, Compromising Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Inadequate, Posing Significant Risks To Psdl And Staff Safety. Unacceptable (0%): The Design Neglects Perimeter Walls, Guard Towers, And Security Features, Failing To Ensure Pdl Containment And Facility Security. Fire Protection And Detection Systems Are Absent Or Non-functional, Posing Severe Risks To Psdl And Staff Safety. D. Sustainability And Environmental Considerations: Excellent (100%): The Design Includes Robust Safety Measures And Emergency Protocols, Ensuring The Safety And Well-being Of Psdl And Staff In Accordance With Ra 10575. Good (80%): The Design Integrates Sustainable Design Principles Effectively, With Minor Opportunities For Improvement In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Adequate, Supporting Environmental Sustainability. Acceptable (70%) The Design Includes Basic Sustainable Design Principles, Meeting Minimum Requirements For Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Functional, Contributing To Environmental Sustainability. Some Reservations (50%): The Design Partially Incorporates Sustainable Design Principles, With Notable Deficiencies In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Lack Comprehensiveness, Limiting Environmental Sustainability. Serious Reservations (20%): The Design Lacks Consideration For Sustainable Design Principles, Neglecting Energy Efficiency And Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Insufficient, Undermining Environmental Sustainability. Unacceptable (0%): The Design Disregards Sustainable Design Principles, Showing No Commitment To Energy Efficiency Or Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Absent Or Inadequate, Disregarding Environmental Sustainability. E. Aesthetics And Architectural Design: Excellent (100%): The Design Exhibits Exceptional Aesthetic Appeal And Architectural Coherence, Showcasing Innovative And Visually Pleasing Elements. Consideration Of Local Architectural Vernacular And Contextual Integration Is Evident, Contributing To The Overall Excellence Of The Design. Good (80%): The Design Demonstrates Good Aesthetic Appeal And Architectural Coherence, With Some Areas For Enhancement In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Apparent, Enriching The Design. Acceptable (70%): The Design Achieves Acceptable Aesthetic Appeal And Architectural Coherence, Meeting Basic Expectations For Visual Presentation. Consideration Of Local Architectural Vernacular And Contextual Integration Is Present, Though Limited In Scope. Some Reservations (50%): The Design Lacks Significant Aesthetic Appeal And Architectural Coherence, With Notable Deficiencies In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Minimal, Detracting From The Overall Quality Of The Design. Serious Reservations (20%): The Design Exhibits Poor Aesthetic Appeal And Architectural Coherence, Failing To Engage Visually Or Inspire Interest. Consideration Of Local Architectural Vernacular And Contextual Integration Is Lacking, Diminishing The Design's Relevance And Appropriateness. Unacceptable (0%): The Design Lacks Any Aesthetic Appeal Or Architectural Coherence, Showing No Effort To Engage Visually Or Integrate With The Local Architectural Vernacular. Consideration Of Contextual Integration Is Absent, Rendering The Design Unsuitable For The Project. 8.1.2 Approach And Methodology For Detailed Engineering, Design, And Construction (40 Points) Excellent (100%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Exceptionally Clear, Feasible, Innovative, And Comprehensive. The Plan Demonstrates A High Level Of Understanding Of Project Problems, Risks, And Suggested Solutions, With Well-defined Strategies For Addressing Them. Good (80%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Clear, Feasible, And Comprehensive, With Some Innovative Elements. The Plan Adequately Addresses Project Problems, Risks, And Suggested Solutions, Though Some Areas May Require Further Development. Acceptable (70%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Satisfactorily Addresses Project Requirements, With A Basic Level Of Clarity And Feasibility. The Plan Outlines Strategies For Addressing Project Problems, Risks, And Suggested Solutions, Meeting The Minimum Expectations. Some Reservations (50%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Partially Addresses Project Requirements, With Notable Gaps In Clarity And Feasibility. The Plan Lacks Innovative Elements And May Inadequately Address Project Problems, Risks, And Suggested Solutions. Serious Reservations (20%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Demonstrates Significant Deficiencies In Clarity, Feasibility, And Comprehensiveness. The Plan Fails To Adequately Address Project Problems, Risks, And Suggested Solutions, Indicating A Lack Of Understanding Or Inadequate Planning. Unacceptable (0%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Unclear, Infeasible, And Lacks Comprehensiveness. The Plan Fails To Address Project Problems, Risks, And Suggested Solutions, Indicating A Fundamental Misunderstanding Or Disregard For Project Requirements. 8.1.3 Quality Of Personnel Assigned To The Project (25 Points) Excellent (100%): The Personnel Assigned To The Project, Including Key Staff, Are Highly Suitable And Competent To Perform Their Duties. Key Staff Members Possess Exceptional Qualifications, Competence, Education, And Training Relevant To Their Roles, Demonstrating A High Level Of Expertise And Experience. Good (80%): The Personnel Assigned To The Project, Including Key Staff, Are Suitable And Competent To Perform Their Duties Effectively. Key Staff Members Possess Relevant Qualifications, Competence, Education, And Training, Demonstrating Solid Expertise And Experience. Acceptable (70%): The Personnel Assigned To The Project, Including Key Staff, Meet The Basic Requirements For Suitability And Competence In Performing Their Duties. Key Staff Members Possess General Qualifications And Competence, Education, And Training Relevant To Their Roles, Meeting The Minimum Expectations. Some Reservations (50%): The Personnel Assigned To The Project, Including Key Staff, Demonstrate Some Suitability And Competence In Performing Their Duties, But Notable Deficiencies Are Present. Key Staff Members May Lack Certain Qualifications, Competence, Education, Or Training, Raising Concerns About Their Ability To Effectively Fulfill Their Roles. Serious Reservations (20%): The Personnel Assigned To The Project, Including Key Staff, Exhibit Significant Deficiencies In Suitability And Competence To Perform Their Duties. Key Staff Members Lack Essential Qualifications, Competence, Education, Or Training, Indicating A Lack Of Expertise Or Experience Relevant To Their Roles. Unacceptable (0%): The Personnel Assigned To The Project, Including Key Staff, Are Unsuitable And Incompetent To Perform Their Duties Effectively. Key Staff Members Lack The Necessary Qualifications, Competence, Education, And Training, Demonstrating A Fundamental Mismatch With The Requirements Of Their Roles. 8.2 Determination Of The Merit Point Score The Aggregate Of The Scores In Each Criterion Must Be 70% Or More To Pass Using The Following Formula In Equation. Description Weight (w) Rating (r) Criteria 1 35% (smax/sact) Criteria 2 40% Sact Criteria 3 25% Sact Smax = Η (100) Sact = R1 +r2 +r3 + . . .(rη) Where Η = Number Of Sub Criteria R = Rating Given To The Criteria/sub Criteria The Actual Score (sact) For Each Of The Criteria/sub Criteria Is Obtained By Adding All The Given Rating. (smax) Is The Summation Of Maximum Score Per Criteria 8.3 Passing Rate The Specific Passing Rate Value Depends On The Specific Context Of The Project, The Priorities Of The Design And Build Committee, And The Complexity Of The Requirements Outlined In Ra 10575. Based On The Provided Criteria And Descriptions, The Passing Rate For The Merit Point Criteria (mpc) Could Be Set At 75%. This Means That Bidders Must Score At Least 75% Or Higher In The Evaluation Process To Be Considered As Meeting The Minimum Requirements For The Project A. Pass Rate Per Criteria Will Be Determined Using The Formula: Score = W1*r1 + W2*r2 + W3*r3 B. A Bid Or Technical Bid That Failed In Any Of The Criteria’s Will Not Be Considered For Further Evaluation C. Score Above 75% Will Be Considered As Technically Responsive. Aggregate Score Of Less Than 75% Will Be Considered Failed, And May Be Rejected On That Basis. Second-step Procedure: Only Those Bids That Passed The Above Criteria Shall Be Subjected To The Second Step Of Evaluation. The Bac Shall Open The Financial Proposal Of Each “passed” Bidder And Shall Evaluate It Using Non-discretionary Criteria – Including Arithmetical Corrections For Computational Errors – As Stated In The Bidding Documents, And Thus Determine The Correct Total Calculated Prices. The Bac Shall Automatically Disqualify Any Total Calculated Bid Price Which Exceeds The Abc 9. Data To Be Provided By The Bucor These Data Are For Reference Only And Does Not Guarantee The Contractor That The Data Provided Are Correct, Free From Error, And Applicable To The Project At Hand. The Contractor Is Responsible For The Accuracy Or Applicability Of Any Data That He Will Use In His Design– Build Proposal And Services. Sample Data For Buildings: A. Conceptual Plans 10. Documents To Be Provided By The Contractor During Contract Implementation A. Detailed Architectural And Engineering Plans B. Design Analysis C. Survey Data D. Quantity Calculation E. Detailed Geotechnical Investigation Report F. Design Report. G. As-built Plans, (printed Including Cad Files And Bim Files (lod 500) H. Other Relevant Documents 11. Design And Build Period The Winning Bidder Shall Commence Actual Works Upon The Issuance By The Bucor Of The Notice To Proceed (ntp). The Winning Bidder Shall Complete The Daed And Submit Within The Ninety (60) Calendar Days (cds) Period To The Bucor For Review And Approval. The Contractor Shall Complete The Construction Of The Building Within 305 Cds For The Total Contract Duration Of 365 Cd. Conforme: Name Of Company In Print Signature Over Printed Name Of Authorized Representative/date Section Vii. Drawings The Conceptual Drawings Should Be Attached To This Section Or Annexed In A Separate Folder As Part Of The First Envelope (technical Component Envelope). Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: At Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 1. Location Plan/vicinity Map 2. Perspective 3. Floor Plans 4. Front View Elevation 5. Rear View Elevation 6. Left Side View Elevation 7. Right Side View Elevation 8. Longitudinal Section 9. Transverse Section Section Viii. Bill Of Quantities The Bill Of Quantities Should Be Attached To This Section As Part Of The Second Envelope (financial Component Envelope). Section Ix. Checklist Of Technical And Financial Documents Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (d) Special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc) And Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate Or Board Resolution/partnership Resolution In Case Of A Corporation, Partnership, Or Cooperative; Or Original Notarized Special Power Of Attorney In Case Of Sole Proprietorship Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. And ⬜ (h) Conformity With The Technical Specifications (scope Of Work); And ⬜ (i) Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 1. Location Plan/vicinity Map 2. Perspective 3. Floor Plans 4. Front View Elevation 5. Rear View Elevation 6. Left Side View Elevation 7. Right Side View Elevation 8. Longitudinal Section 9. Transverse Section ⬜ (j) Design And Construction Method And ⬜ (k) Value Engineering Analysis Of The Design And Construction Method. And Financial Documents ⬜ (l) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. And Class “b” Documents ⬜ (m) Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And Its Irr. Each Partner Of The Joint Venture Shall Submit Their Respective Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. Ii. Financial Component Envelope ⬜ (n) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (o) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (p) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (q) Cash Flow And Payment Schedule. Bidding Form Company Letterhead Statement Of Ongoing Government & Private Contracts Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Statement Of All Its Ongoing Government And Or Private Contracts Including Contracts Awarded But Not Yet Started, If Any Whether Similar Or Not Similar In Nature. Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Date Of Completion Or Estimated Completion Time Value Of Outstanding Works Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Statement Of Single Largest Completed Contract Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Statement Of Single (1) Largest Completed Contract Of Similar In Nature Within The Last Six (6) Years From The Date Of Submission And Receipt Of Bids Amounting To At Least Fifty Percent (50%) Of The Approved Budget Of The Contract (abc) Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Amount Of Completed Contracts, Adjusted By The Bidder To Current Prices Using Psa’s Consumer Price Index, If Necessary Date Of Completion Or Estimated Completion Time Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: Bureau Of Corrections I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. ______________________________________________________ [insert Name Of Bidder’s Authorized Representative] _____________________________ [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ Issued On ______________ At ___________________________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued Doc. No. _____ Page No. _____ Book No. _____ Series Of ____ Company Letterhead Omnibus Sworn Statement Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) _________________________________________________________________________ Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections, As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections, As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase). 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 2024 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ And Issued On ____________________ At _____________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Certificate Of Net Financial Contracting Capacity Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (please Show Figures At How You Arrived At The Nfcc) This Is To Certify That Our Net Financial Contracting Capacity (nfcc) Is _____________________ (p____________) Which Is At Least Equal To The Total Ceiling Price We Are Bidding. The Amount Is Computed As Follows: (please Show Computation Of Nfcc) Nfcc = (ca-cl) (15) – C Where: Ca = Current Assets Cl = Current Liabilities C = Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Going Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project Note: The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Audited Financial Statement Submitted To The Bir. Issued This _________________day Of ________________, 2024 _______________________________________________ Name & Signature Of Authorized Representative ____________________ Position _______________ Date Company Letterhead Bid Form Date: Ib No: To Bids And Awards Committee Bureau Of Corrections Nbp Reservation Muntinlupa City We, The Undersigned, Declare That: (a) We Have Examined And Have No Reservation To The Bidding Documents, Including Addenda, For The Contract Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) At Sablayan Prison And Penal Farm (sppf) (b) We Offer To Execute The Works For This Contract In Accordance With The Bid And Bid Data Sheet, General And Special Conditions Of Contract Accompanying This Bid; The Total Price Of Our Bid, Excluding Any Discounts Offered Below Is: ________________________________________₱_________________; The Discounts Offered And The Methodology For Their Application Are: [insert Information]; (c) Our Bid Shall Be Valid For A Period Of 120 Calendar Days From The Date Fixed For The Bid Submission Deadline In Accordance With The Bidding Documents, And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period; (d) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of 30% Percent Of The Contract Price For The Due Performance Of The Contract; (e) Our Firm, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Have Nationalities From The Following Eligible Countries; (f) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (g) Our Firm, Its Affiliates Or Subsidiaries, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Has Not Been Declared Ineligible By The Funding Source; (h) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (i) We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Other Bid That You May Receive. (j) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Design And Build Of Bureau Of Corrections Supermaximum Prison Facility (2nd Phase) Of The Bureau Of Corrections. (k) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be A Ground For The Rejection Of Our Bid. Name: In The Capacity Of: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________
Closing Date20 Jan 2025
Tender AmountPHP 300 Million (USD 5.1 Million)
571-580 of 578 active Tenders