Tenders of Municipal Economy Of The Middle Mountain Road

Tenders of Municipal Economy Of The Middle Mountain Road

Municipal Economy Of The Middle Mountain Road Tender

Civil And Construction...+1Civil Works Others
Germany
Public tender Vob/a Due to the stability of the retaining wall being at risk, the construction project involves the renovation of this retaining wall in Bensheim-Schöneberg on the paths “im Gerstengrund” and “am Schloßpark”. After a heavy rainfall event in January 2022, there was also a local subsidence of the gravel path “am Schloßpark” running along the embankment crown. The affected section of the path was then immediately cordoned off. The planned measures include: Renovation of the Bensheim-Schöneberg retaining wall: - Dismantling of the rubble stone wall approx. 60 m³ - Dismantling of the concrete retaining wall approx. 15 m³ - Dismantling of the fall protection two-beam wooden railing approx. 50 m - Dismantling of the fence system approx. 10 m - Excavation work in the embankment area approx. 95 m³ - Excavation work strip foundation renewed rubble stone wall approx. 51 m³ - Excavation work temporary ramp in the embankment area approx. 115 m³ - Trench for foundation beams for railings at the top edge of the embankment approx. 40 m³ - Excavation work embankment for erosion protection approx. 130 m² - Repair of the sidewalk areas “at the castle park” and “in Gerstengrund” approx. 150 m² - Special foundation engineering work soil nailing 56 pieces, L = approx. 196 m - Shotcrete - Nail wall approx. 22 M³ - Reinforcing steel shotcrete shell approx. 2.5t - Structural securing of quarry stone masonry shell, wall anchor approx. 70 M - Mortared quarry stone masonry, approx. 75 M³ - Concrete work foundation for quarry stone masonry, approx. 22.5 M³ - Concrete work for railings on the top edge of the slope approx. 32 M³ - Reinforcing steel foundations approx. Approx. 4.8 T - Scaffolding work, working scaffold for shotcrete nail wall and quarry stone wall - Filler bar railing approx. 51 M - Rockfall protection system approx. 30 M - Drainage area of shotcrete shell approx. 95 M² drainage layer
Closing Date4 Dec 2024
Tender AmountRefer Documents