Mask Tenders

Mask Tenders

Department Of Labor And Employment Tender

Publishing and Printing
Philippines
Details: Description Lot A 23 Box Clearbook, A4 Size (piece)refillable, Material: Plastic, Cover: Opaque Plastic, Dimension: 310mm X 235mm (min.), Thickness: 0.5mm (min.), Pocket: Transparent Plastic, Number Of Pockets: Twenty (20), Thickness: 0.04 Mm (min.), Color: Assorted ( Black, Blue, Red, Yellow) 23 Box Clearbook, Legal Size (piece) Refillable, Material: Plastic, Cover: Opaque Plastic, Dimension: 345mm X 235mm (min.), Thickness: 0.04mm (min.), Color: Assorted ( Black, Blue, Red, Yellow) 30 Piece Eraser, Plastic/rubber (piece) Rectangular, Dimension (l X W X T) (min.): Equivalent Volume Of 8,350mm3 422 Piece Sign Pen, Extra Fine Tip, Black (piece) Ink Color: Black, Type: Liquid Or Gel, Tip: 0.5mm, Needle Type, One (1) Piece Barrel (non-refillable), Writing Length: One (1) Km (min) 172 Piece Sign Pen, Fine Tip, Black 182 Piece Sign Pen, Medium Tip, Black (piece) , Black (piece) Ink Color: Black, Type: Liquid Or Gel, Tip: 0.7mm, Needle Type, One (1) Piece Barrel (non-refillable), Writing Length: One (1) Km (min) 43 piece Sign Pen, Medium Tip, Blue(piece) , Blue(piece) Ink Color: Blue, Type: Liquid Or Gel, Tip: 0.7mm, Needle Type, One (1) Piece Barrel (non-refillable), Writing Length: One (1) Km (min) 1 pack "wrapping Paper, Kraft, Weight: 65gsm (-5%), Size: Width: 914.4mm (36"") (-3mm), Length: 1,219.4mm (48"") (-3mm)" 25 pack  Battery, Dry Cell, Size Aa (pack) 1.5 Volts, Alkaline, Minimum Of Thirty (30) Minutes Runtime With A Current Draw Of 1.0 Amp Until Cut-off At One (1) Volt 19 pack  Battery, Dry Cell, Size Aaa (pack)1.5 Volts, Alkaline, Minimum Of Thirty (30 Min.) Runtime With A Current Draw Of 0.5 Amp Until Cut-off At One (1) Volt, Shelf Life: Five (5) Years (min) From Date Of Acceptance 19 Bottle Ink, For Stamp Pad (bottle) Volume (min): 50ml, With Applicator, Shall Conform With The Required Perfamnce Test: Dry Time, Stability Test, Resistance To Water, Effect On Rubber Stamp, Corrosion Of Stamp-pad Container 2 Unit Digital Voice Recorder, Built-in Memory: 4gb (expandable), Channel: Stereo, Recording & Playback Format: Mp3, Wma, Earphone Jack, Built-in Microphone, Usb Connectivity, Battery Life 20 Hours (min) (recording Mode, Mp3 128kbps 2 Unit Fire Extinguisher, Dry Chemical, Capacity In Terms Of Mass Of Extinguisher Medium: 4.5kg (10lbs), Purity Of The Chemical: 75% (min.), Duration Of Discharge: 10 Seconds (min.) 5 Piece Philippine National Flag (piece) Type: 1, Size: Length: 1,828.8mm (6') (-3mm), Width: 914.4mm (3') (-3mm), Material: 100% Polyester, With Certificate Of Accreditation From National Historical Commission Of The Philippines (nhcp) 4 Unit "external Hard Drive (unit) Capacity: 1tb, Weight: 181 G - 205 G, Storage Media: 2.5""sata Hdd, Rotational Speed: 5400 Rpm, System Requirements: 1. Ms Windows 7, Ms Windows 8, Ms Windows 10, Mac Os 10.7 Or Later, Linux Kernel 2.6.31 Or Later, Antivirus: Pre-installed Antivirus (optional), Accessories: With Usb 3.0 Cable And Product Manual In English" 17 Piece Flash Drive (piece) 64gb Capacity 7 Unit Computer Mouse, Wireless (unit)connection Type: Usb, Tracking Method: Optical, Resolution: 1,000 Dpi (min), High-definition Optical: 2.5x More Responsive Than Standard Optical Mouse, 1000dpi High Technology Delivers Smoother, More Accurate Cursor Control 15 Piece Light-emitting Diode (led) Light Bulb, 7 Watts, Power Consumption: 7 Watts (max), Color Temperature: 6,500 Kelvin, Lumen Output: Not Less Than 530 Lumens, Frequency Rating: 60hz, Color Rendering Index: 80 +/-10%, Input Voltage: 220-240 Volts, Ac, Socket Base: E27, Light Color: Cool Daylight, Power Factor: Not Less Than 0.90, Average Life: Not Less Than 15,000 Hours, Operating Temperature: ≥ 35°c 73 jar Glue, All-purpose (bottle) Gross Weight (min.): 200 Grams, Free Formaldehyde(max.): 0.1%, Adhesive Strength - No Slippage On Pasted Part, Solid Content (min.): 30%, Ph: 4 To 8,container: Plastic Jar, Cap: Plastic Non-stick Easy Open Twist Top, With Tapered Applicator Attached To The Cap 42 box Staple Wire, Heavy Duty (binder Type), 23/13, Type: Chisel Point, Thickness: 0.60mm (-0.05), Width: 13mm (0.20), Leg Length: 13mm (-0.30), Number Of Staples Per Strip:100, Number Of Staples Per Box: 1,000, Binding Capacity: 40-90 Sheets Of 70gsm Multi-purpose Paper 201 box Staple Wire, Standard (box) 5000 Wires Per Box, Dimensions, In Mm: (see Fig. 1), Width (w): 12.70 +0.15mm/-0.20mm, Leg Length (l): 6.00 +0.50mm/-0.20mm, Thickness (d): 0.40 + 0.05mm, Width (e): 0.50 + 0.05mm, Number Of Wires Per Strip: 100 (min) 12 roll Tape, Electrical, Made Of Polyvinyl Chloride (pvc), Width: 18mm (min.), Length: 16 Meters (min.), Assorted Colors 36 roll Tape, Masking, 24mm (roll)width: 24mm (+1mm), Usable Length: 50 Meters, Adhesion Strength: 8.5n/24mm Width (min), Breaking Strength: 65n/24mm Width (min) 68 roll Tape, Masking, 48 Mm (roll) Width: 48mm (+1mm), Usable Length: 50 Meters, Adhesion Strength: 8.5/24mm Width (min), Breaking Strength: 65n/24mm Width (min) 70 roll Tape, Packaging, 48 Mm (roll) Color: Tan, Width: 48mm (+1mm), Usable Length: 50 Meters, Base Material: Biaxially-oriented Polypropylene, Adhesion Strength: 6n/24mm (min), Breaking Strength: 14n/24mm (min) 52 roll Tape, Transparent, 24mm (roll) Width: 24mm (+1mm), Usable Length: 50 Meters, Base Material: Biaxially-oriented Polypropylene, Adhesion Strength: 6n/24mm (min), Breaking Strength: 14n/24mm (min) 69 roll Tape, Transparent, 48 Mm (roll) Width: 48mm (+1mm), Usable Length: 50 Meters, Base Material: Biaxially-oriented Polypropylene, Adhesion Strength: 6n/24mm (min), Breaking Strength: 14n/24mm (min) 11 roll Twine, Plastic (roll) Weight Per Roll (min.): 1000g, Breaking Strength(min.): 25kg 20 piece Ruler, Plastic, 450mm (piece) Transparent/clear, Ruler Scale: Millimeters, Centimeters, Inches, Clear And Sharp Ruler Scales, Width: 38mm (min), Thickness: 1.30mm (min) 14 unit Calculator, Compact (unit) Width: 100mm - 130mm, Lcd Display, Capacity: 12 Digits, Two Way Power Source (solar And Cell) 10 boc Clip, Backfold, 15mm 87 box Clip, Backfold, 19mm (box) All Metal, Clamping Length: 19mm (-1mm), Clamping Depth: 10mm (min.), Thickness Of Metal: 0.20mm (min.), Diameter Of Clip Handles: 1.0mm (min.) 94 box Clip, Backfold, 25mm (box) All Metal, Clamping Length: 25mm (-1mm), Clamping Depth: 13mm (min.), Thickness Of Metal: 0.22mm (min.), Diameter Of Clip Handles: 1.20mm (min.) 36 box Clip, Backfold, 32mm (box) All Metal, Clamping Length: 32mm (-1mm), Clamping Depth: 14mm (-1mm) Thickness Of Metal: 0.30mm (min.), Diameter Of Clip Handles: 1.45mm (min.) 26 box Clip, Backfold, 50mm (box) All Metal, Clamping Length: 50mm (-1mm), Clamping Depth: 25mm (-1mm), Thickness Of Metal: 0.33mm (min.), Diameter Of Clip Handles: 1.85mm (min.) 252 piece Correction Tape (piece) Disposable, Dispensing Mechanism: Gear Type, Dispensing System: Single Line Tape 21 piece Cutter/utility Knife, For General Purpose (piece) Length: 100mm (+2mm), Width: 16mm (+2mm) Thickness: 0.40mm (+0.02mm) 85 piece Data File Box (piece) Outside Dimension: Width: 125mm (min), Height: 230mm (min), Length: 400mm (min), Material: Chipboard: 3mm Thick (min) 53 piece Data Folder (piece) Dimension: Width: 75mm (min), Height: 230mm (min), Length 380mm (min), Material: Chipboard: 2,5mm Thick (min) 11 piece Dater Stamp (piece) With Locking Mechanism, With Self-inking Stamp, With Removable And Refillable Ink Pad, Single Color, Size Of Imprint: 30mm X 45mm (min) 9 box Envelope, Documentary, A4 (box) 14 box Envelope, Documentary, Legal, (box) Size: 254mm X 381mm (-2mm), Basis Weight: 150gsm (-5%), Thickness (min.): 0.22mm 12 box Envelope, Expanding, Kraft (box) Legal Size: 380mm X 250mm (-3mm), Expansion: 50mm (-3mm), Thickness (min.): 0.38mm 4 box Envelope, Expanding, Plastic (box) 10 box Envelope, Mailing (box) 13 piece Eraser, Felt, For Blackboard/whiteboard (piece) Overall Size (l X W X T) (min.): 125mm X 45mm X 19mm 30 box Fastener, Metal (box) Thickness: Base With Prongs And Compressor: 0.30mm (min.), Material: As Per Sample Provided, Able To Hold 25mm Thick Of Multipurpose Paper (70gsm), 70mm Between Prongs 43 piece File Organizer, Expanding, Plastic, Legal (piece) With 12 Inside Pockets With Index Tab, For Legal Size Paper /documents, Dimension (min.): Cover (flap): Width: 220mm Length: 380mm Thickness: 0.60mm, Inside Pocket: Width: 230mm Length: 360mm Thickness: 0.12mm 49 pack "file Tab Divider, A4, For 210mm X 297mm (a4 Size) Documents, Size (min): Leaf: Length: 297mm Width: 210mm Tab: Length: 65mm Width: 12mm, Basis Weight: 153gsm (-5%), Thickness: 0.22mm (min.) " 37 pack Folder, L-type, Legal, Materials: Plastic, Size: 235mm X 346mm (min.) Thickness: (min.): 0.17mm, Transparent For Easy Identification Of Contents, Assorted Colors 3 box "folder, Pressboard (box) • Material: Heavy Duty Paper Board • Size: 369mm X 242mm (-smm) • Thickness: 0.40mm (min.) • Basis Weight: 312gsm (min.) • Color: Cream, Green Or Maroon, Etc. • Accordion-pleat Gusset: Latex Paper/pvc Bookbinder/book Cloth/paper Cloth, Color: Green, Red, Blue, Expansion: 39mm (-3mm)" 1 pack Folder With Tab, A4, Material: Tagboard/carrier/foldcote/cupstock Board, Leaf Dimension: 240mm X 320mm (+1mm), Tab: 13mm (+2mm), Scoring: 20mm From Edge Of Forlder (+2mm), Other Physical Properties: Grammage G/m²:308 (-5%), Thickness, Mm:0.35 (min), Tearing Resistance, Mn, Md + Cd 2940 (min), Stiffness, Mn.m, (taber) Md + Cd: 13 (min) 45 pack Folder With Tab, Legal (pack) Material: Tagboard/carrier/foldcote/cupstock Board, Leaf Dimension: 240mm X 320mm (+1mm), Tab: 13mm (+2mm), Scoring: 20mm From Edge Of Forlder (+2mm), Other Physical Properties: Grammage G/m²:308 (-5%), Thickness, Mm:0.35 (min), Tearing Resistance, Mn, Md + Cd 2940 (min), Stiffness, Mn.m, (taber) Md + Cd: 13 (min) 27 box "index Tab (box) Transparent, Self-adhesive, Assorted Colors, Five (5) Sets Per Box, One (1) Set Composed Of 2-pieces 6"" Tab Strip And Two (2) Complete Alphabets" 40 piece Magazine File Box, Large, Material: Chipboard: 3mm Thick (min.), Leatherette Paper For Outside Cover, Coated Paper For Inside Cover, Outside Dimension: :width: 110mm (min), Height: 265mm (min), Length: 220mm (min) 36 set Marker, Flourescent (set) Barrel: Flat, Tip: Chisel Point, Color: Three (3) Assorted Colors Per Set, Material And Structure: The Barrel And The Cap Shall Be Made Of Plastic And The Cap Shall Fit Snugly Or Firmly To The Barrel And Of Such Structure That Will Easily Cap And Uncap, Quality: Writing Performance: Flourescent Marker Shall Continuously Highlight On Multipurpose Paper For A Distance Of At Least 100 Meters Under Normal Pressure And Shall Not Show Noticeable Change In Ink Intensity. Cap-off Time: 45 Minutes (min) 225 piece Marker, Permanent, Black (piece) Ink Color: Black, Tip: Felt, Bullet Type, Point: Medium, Structure: The Barrel And The Cap Shall Fit Snugly Or Firmly To The Barrel And Os Such Structure That Shall Easily Cand And Uncap 80 piece Marker, Permanent, Blue (piece) Ink Color: Blue, Tip: Felt, Bullet Type, Point: Medium, Structure: The Barrel And The Cap Shall Fit Snugly Or Firmly To The Barrel And Os Such Structure That Shall Easily Cand And Uncap 86 piece Marker, Whiteboard, Black (piece) Ink Color: Black, Blue, Red, Tip: Felt, Bullet Type, Structure: The Barrel And The Cap Shall Fit Snugly Or Firmly To The Barrel And Of Such Structure That Shall Easily Cand And Uncap 19 piece Marker, Whiteboard, Red, Ink Color: Red, Tip: Felt, Bullet Type, Structure: The Barrel And The Cap Shall Fit Snugly Or Firmly To The Barrel And Of Such Structure That Shall Easily Cand And Uncap 76 box Paper Clip, Vinly/plastic Coated, 33mm (box) Wire Diameter: 0.80mm (min), Length Of Clip: 33mm (min), Total Length Of Wire Used: 102mm (min), Assorted Colors 100 Box Paper Clip, Vinly/plastic Coated, Jumbo, 50mm (box) Wire Diameter: 1.0mm (min), Length Of Clip: 50mm (min), Total Length Of Wire Used: 155mm (min), Assorted Colors 19 Box Pencil, Lead/graphite, With Eraser, Hardness: Hb Or 2, Lead/graphite Diameter: 2mm (min), Wood Casing: Softwood, Coated, Free From Defects As Cross Grains, Interlocked Grains, Warpage Knots And The Like; And Shall Permit Easy Sharpening 11 Piece Pencil Sharpener, Table Mountable Type, With Metal Clamp, Single Cutter-head, One Hole Guide, 9-10mm In A Diameter, All Main Parts Shall Be Made Of Metal Particularly The Cutting Mechanism Cutter,pinion Gear,internal Gear,handle 23 Piece Puncher, Paper, Heavy Duty (piece) Punching Capacity: 30 Sheets Of 70gsm Multipurpose Paper, With Two Hole Guide, Diameter Of Hole: 7mm (approx) 19 Box Rubber Band No. 18 (box) 35o Grams (min) (net Weight), Thickness: 1.00mm (min), Lay Flat Length: 70mm (min), Tensile Strength: 9.81mpa (min), Elongation: 250% (min) 31 Piece Stamp Pad, Felt (piece) Thickness Of Felt: 5mm (min.), Thickness Of Metal: 0.20mm (min.), Stamp Bed Size: Width: 60mm (min.), Length: 100mm (min.) 68 Pair Scissors, Symmetrical/asymmetrical (pair) Overall Length: 160mm (min), Length Of The Cutting Blade: 70mm (min), Thickness Of The Cutting Blade: 1.70mm (min), Length Of Metal Handle (measured From The Center Of The Binding Rivet Screw To The Tip Of The Metal Handle): 35mm (min) 37 Piece Stapler, Standard Type (piece) Loading Capacity: 200 Staples (min), One Time Binding Capacity Of 2-20 Sheets Multi-purpose Paper (70gsm)r 6 Unit Stapler, Heavy Duty (binder) (unit) Type: Desktop, High Capacity/volume, Compatible With The Following Staple Sizes: 13mm And 17mm, Material: Body: Metal, Bases Grip: Non-skid Durable Material, Stapling Capacity: 25-135 Sheets Of 70gsm Multi-purpose Paper, Load Capacity: 100 Staples (min), Throat: Depth: 65mm (min) With Adjustable Paper Guide, Dimension: Manufacturer's Standard 9 Piece Tape Dispenser, Table Top (piece) Net Weight (min.): 1.2kg, Body Made Of Rigid Plastic, Smooth Finish: Weighted, Serrated Cutting Blade Thickness: 0.40mm +0.03mm, Holds Rolls Up To 24mm Wide On 75mm Core, Assorted Color 17 Pack Cartolina, Assorted Colors (pack) Bristol Board, Size: 572mm X 724mm (-3mm), Basis Weight: 100gsm (min.), Thickness: 0.12mm (min.), Assorted Colors: Blue, Green, Yellow, Orange, Lavender, Violet, Gold And Pink, Minimum Of Four (4) Colors 158 Pad "notepad, Stick-on, 50mm X 76mm (pad) Size: 50mm X 76mm (2"" X 3"") (min), Basis Weight: 70gsm (min), Sheet Thickness: 0.09mm (min), Assorted Colors" 175 Pad "notepad, Stick-on, 76mm X 100mm (pad) Size: 76mm X 100mm (3"" X 4"") (min), Basis Weight: 70gsm (min), Sheet Thickness: 0.09mm (min), Assorted Colors" 98 Pad "notepad, Stick-on, 76mm X 76mm (pad) Size: 76mm X 76mm (3"" X 3"") (min), Basis Weight: 70gsm (min), Sheet Thickness: 0.09mm (min), Assorted Colors" 153 Piece Steno Notebook (piece) Basis Weight: 55gsm (-5%) Bond, Thickness: 0.075mm (min), Size: 150mm X 225mm, (min), Top Margin: 25mm (min.), Bottom Margin: 5mm, Number Of Spaces: 22 (min), Cover Thickness: 0.40mm (-0.02mm), 40 Leaves, Ruled Both Sides 40 Bond Paper , Legal, 70 Gsm 40 Ream Bond Paper , A4, 70 Gsm 591 Ream Paper, Multicopy A4 (ream) Basis Weight: 80gsm (-3%), Size: A4, 210mm X 297mm (+2mm In Either Direction), Trim Sizes Shall Be Along Machine Direction Or Long Grain 156 Ream Paper, Multicopy Legal (ream) Basis Weight: 80gsm (-3%), Size: Legal, 216mm X 330mm (+2mm In Either Direction), Trim Sizes Shall Be Along Machine Direction Or Long Grain 419 Ream Paper, Multipurpose A4, Basis Weight: 80gsm (min.), Size: Legal, 216mm X 330mm (+2mm In Either Direction), Trim Sizes Shall Be Along Machine Direction Or Long Grain 93 Ream Paper, Multipurpose Legal, Basis Weight: 80gsm (min.), Size: Legal, 216mm X 330mm (+2mm In Either Direction), Trim Sizes Shall Be Along Machine Direction Or Long Grain 15 Box Paper, Parchment, Size: 210mm X 297mm (+2mm In Either Direction), Basis Weight: 80gsm (-5%), Fine Translucent, Suitable For Laser/inkjet Printing 48 Book Record Book, 300 Pages (book) Basis Wieght: 55gsm (-5%), Thickness: 0.07mm (minimum), Size: L X W: 265mm X 165mm (minimum), Cover Material: Laminated Chipboard, Thickness: 1.5mm (minimum) Size: L X W: 278mm X 175mm (minimum), Margins Top: 25mm (-2mm), Bottom: 8mm (+4mm), Left / Right: Manufacturer's Standard 37 Book "record Book, 500 Pages (book) Basis Weight: 55 Gsm (-5%) Thickness 0.07 Mm (minimum) Size L X W: 265mm X 165mm (minimum) Cover Material Laminated Chipboard Thickness 1.5mm (minimum) Size L X W: 278mm X 175mm (minimum) Margins Top 25mm (-2mm) Bottom 8mm (±4mm) Left / Right Manufacturer’s Standard" 35 Cart Ink Cartridge, Epson C13t664100 (t6641), Black 30 Cart Ink Cartridge, Epson C13t664200 (t6642), Cyan 30 Cart Ink Cartridge, Epson C13t664300 (t6643), Magenta 30 Cart Ink Cartridge, Epson C13t664400 (t6644), Yellow 1054 piece Ballpen 36 pack Sticker Paper , A4, Matte, White, 10 Pcs/pack 21 pack Sticker Paper , Legal, Matte, White, 10 Pcs/pack 25 roll Double Sided Tape 31 pack Photo Paper, A4 Size, Glossy, 10 Sheets/pack 15 packs Photo Paper Legal 4 bottle Disinfectant Bleaching Solution, 3.78 Lit 67 piece Certificate Frame, A4, Orientation: Landscape, Pvc Black 195 piece Certificate Holder, A4, Plastic 1 unit Microphone 74 box Plastic Fastener, Size: Regular (50pcs/box) 14 box Plastic Fastener, Size: Long 2 piece Extension Cord 2 pack Push Pin 12 piece Glue Stick (paste) 5 pack Glue Stick (for Glue Gun) 2 unit Ergonomic Chair, (midback Synthetic Leather Finished Office Chair- Padded Steel Armrest With Heavy Duty Base With Nylon Caster Wheels, With Pneumatic Gaslift For Height Adjustment) 1 unit Executive Chair (for Fo Head) 2 unit Glue Gun 2 unit Speakers 113 bottle Ink Cartridge, Epson 003 Yellow 109 bottle Ink Cartridge, Epson 003 Magenta 109 bottle Ink Cartridge, Epson 003 Cyan 131 bottle Ink Cartridge, Epson 003 Black 10 bottle Ink Cartridge, Hp Gt52 Yellow 10 bottle Ink Cartridge, Hp Gt52 Magenta 10 bottle Ink Cartridge, Hp Gt52 Cyan 10 bottle Ink Cartridge, Hp Gt53 Black 18 bottle Ink, Brother, Black, Btd60bk, 108ml 9 bottle Ink, Brother, Cyan, Bt5000c, 48.8ml 9 bottle Ink, Brother, Yellow, Bt5000c, 48.8ml 6 bottle Ink, Brother, Magenta, Bt5000c, 48.8ml 37 bottle Ink Refill, Epson Ink 001, Black, 127ml 29 bottle Ink Refill, Epson Ink 001, Cyan, 65ml 29 bottle Ink Refill, Epson Ink 001, Magenta, 65ml 29 bottle Ink Refill, Epson Ink 001, Yellow, 65ml 5 Box Sign Pen, Uniball-impact Gel, Ruber Grip, Steel Point, Water-based Pigment Gel Ink 1.0% Ball, Approx 0.6% Line, 12 Pcs/box 58 Piece Sign Penm Black, Gel 0.7mm 12 Piece Sign Pen, Ink Refill, 0.5, My Gel 3 Meter Pdx Loomex Wire 2 Cart Tonner (5501i, No. Tk6309) 12 Packs Notarial Seal Box Notarial Seal (gold), No. 23, 25pcs/box 1 Piece Glass Top Corner Table 2 Piece Steel Filing Cabinet Four Drawers, Vertical 15 Packs Specialty Board, A4 21 Pad Sign Here Sticky Note Pad 30 Packs Specialty Paper, A4 Lot B 58 Bottle Alcohol, Ethyl, 500 Ml, 68% - 72% Ethyl Alcohol, Fully Miscible In Water, Flip-top Cap, Scented 49 Gallon Alcohol, Ethyl, 1 Gallon, , Strength: 68% - 72%, Volume: 1 Gallon, Bottle: Hdpe 51 Can Air Freshener (can) Aerosol Type, Net Content: 150g (min), Assorted Scents (at Least Three (3) Scents), Long Lasting Fragrance (scent Trace Lingers For Atleast 5 Min.) 10 Piece Broom (walis Tambo) (piece)weight: 500 Grams (max), Handle: Plastic Coated Aluminum Tube, Diameter Of Handle: 19mm (min), Length Of Handle: 545mm (min), Dry Weight Of The Tiger Grass: 200grams (min), Usable Length Of Tiger Grass: 300mm (min), With Upper Stitch: 20 (min) Lower Stitch: 30 (min) 5 Piece Broom (walis Ting-ting) (piece) Made Of Mature Coconut Midribs, Standard Size (min.): 140mm Grip, Measured 150mm From The Top,usable Length (min.): 760mm, Rib Count (min.): 350 Pieces 55 Bottle Cleaner, Toilet Bowl And Urinal (bottle) Color: Cear Or Blue, Net Content: 900ml - 1000ml In Rigid Plastic Bottle, Not Chlorine Based, Viscosity: 114cp At 25°c Min Using Ostwald Method 15 Bar Detergent Bar (piece) Net Weight: 140 Grams As Packed (-2.5%) 30 Pouch Detergent Powder, All-purpose, 1kg, Net Weight: One (1) Kilogram (-2.5%) 51 Can Disinfectant Spray (can) Aerosol Type, Net Content Per Can: 400 Grams (min), Crisp, Clean Scent 11 Piece Dust Pan (piece) Made Of Rigid Non-breakable Plastic, With Detachable Handle: Diameter (min.): 30mm, Length (min.): 600mm, Base (min.): Thickness: 1.25mm, Front Width: 260mm, Back Width: 200mm, Depth: 225mm 13 Can "furniture Cleaner (can) Aerosol Type • For All Types Of Surfaces Such As Furniture, Cabinets And Countertops, Vinyl And Leather, Etc. • Net Content (min.): 300mi Per Can • Pleasant Smell. • Sufficient Amount Of Propellant To Totally Expel Content. • Shelf Life: Must Have A Shelf Life Of At Least Twenty-four (24) Months From The Date Of Manufacture But Not Less Than Eighteen (18) Months From The Date Of Delivery" 48 Bottle Hand Soap, Liquid, 500ml (bottle) Mild Scented, Bactericidal/germicidal Property, Individual Packed Plastic Bottle, Packaging: Standard Packaging Of The Manufacture 1 Unit Mop Bucket, Heavy Duty, Hard Plastic, Material: Hard Palstic, Approximate Size (min.), Width: 370mm Length: 475mm Height: 245mm, Capacity: 30 Liters 4 Piece Mophandle, Heavy Duty, Screw Type, Screw Type, With Metal Mop Head Clipper, Aluminum Handle: Thickness (min.): 0.70mm, Outside Diameter: 22mm To 25mm Length (min.): 1.5 Meters 10 Piece Mophead, Made Of Rayon, 36 Stands Per Head (min), 3 Ply's Per Stand, 40 Threads Per Ply, Weight:400 Grams (min), Length: 410mm (min), Length Of Band: 170mm (min), Breaking Strength, Kg: 126 (min) 5 Kilo "rags All Cotton (bundle) Diameter: 178mm (7"") (approx.) Minimum Of Thirty-two (32) Pieces To A Kilogram, Assorted Colors" 7 Pack Scouring Pad (pack) Made Of Synthetic Nylon, 150mm X 200m (min.), Thickness (min.): 8mm, Color: Green 56 Pack/roll "trashbag, Xxl Size (roll/pack) Color: Black, Dimension: 940mm X 1016mm (-6mm) (37"" X 40""), Thickness: 0.02mm (min), Tensile Strength At Break: Astm D882, One Way: 15n/mm² (min), Other Way: 12n/mm² (min), Elongation At Break: Astm D882, One Way: 400% (min), Other Way: 600% (min)" 54 Pack/roll Trashbag, Large Size (roll/pack) 29 Pack/roll Trashbag, Xl Size (roll/pack) 19 Piece Wastebasket, Non-rigid Plastic, Made Of Rigid Plastic, Thickness (min.): 1.20mm, Height (min.): 225mm, Full Volume (up To The Lid): 8.5 Liters (min.), Assorted Colors 44 bottle Dishwashing Liquid Lemon/calamansi 25 pcs Dishwashing Paste, 200g 34 Pack Tissue, Interfolded Paper Towel (pack) Basis Weight: 34gsm (+/-2gsm), Sheet Dimension: Width Of Sheet: 200mm (+3mm), Length Of Sheet: 200mm (+3mm), Total Number Of Sheets Per Pack: 150 Pulls, Interfolded, Number Of Ply: One (1) Ply 164 Pack Toilet Tissue Paper, 2 Ply (pack) , 100% Recycled, 12 Rolls Per Pack, Weight: 28gsm (min.), Sheet Dimension: Width Of Sheet: 100mm (+/-3mm), Length Of Sheet: 114mm (-5mm) 18 Bottle Hand Sanitizer (bottle) Form: Liquid Or Gels, Volume: 500ml, Hypoallergenic, Non-drying, Bottle: Pump Dispenser Plastic, Fda Certificate Of Product Registration/notification 20 Can Insecticide (can) Aerosol, Kerosene Based, Quick Kill Contact And Residual Type, Cautionary Scent/odor Required, Multi-insect Killer, Net Content Per Can: 600ml (min.) 41 piece Toilet Deodorant Cake, Assorted, 100grms 6 Pcs Doormat Xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
Closing Date9 Dec 2024
Tender AmountPHP 1.1 Million (USD 19 K)

Department Of Education Division Of Sultan Kudarat Tender

Civil And Construction...+1Construction Material
Philippines
Details: Description Invitation To Bid Project No.: (24-10-026) Procurement Of Materials And Tools For Inclusive Learning Resource Center 1. The Department Of Education (deped) Division Of Sultan Kudarat, Through The Cy 2024 Government Appropriations Act (gaa), Intends To Apply The Sum Of Two Million Six Hundred Thirty-one Thousand Five Hundred Thirty Pesos And Two Centavos (p2,631,530.02), Being The Approved Budget For The Contract (abc), To Eligible Payments Under The Contract For Procurement Of Materials And Tools For Inclusive Learning Resource Center Under Republic Act 11975 –fy 2024 Gaa. Bids Received That Exceed The Abc Shall Be Rejected At Bid Opening. Unit Item Description Quantity Unit Cost Total Cost Addition Specification Procurement Of Materials And Tools For Inclusive Learning Resource Center Piece Rubber Mat 36 1,083.33 39,000.00 Interlocking Rubber Mat 1 Meter X 1 Meter X 1" Unit Indoor Therapy Gym 1 106,509.70 106,509.70 89" High X 8', 10', Or 12' Long Monkey-bar System Free-standing Unit - Requires No Additional Bracing For Support Climbing Ladders On Both End Jungle Gym Crossbar Stationary Center Rotary System On 8' And 10' Models. Double Stationary Center Rotary System On 12' Model A Tracking System That Glides The Length Of The Monkey Bars Different Attachments Can Be Added Including Our Indoor Therapy Gym Attachments Kit And Platform Swing. Piece Vestibular Balls 5 1,100.00 5,500.00 Material Rubber Pattern Plain Shape Round Sizes 45-120 Cm (5 Sizes) 1,000/piece Unit Gait Trainer 1 60,500.00 60,500.00 Set Soft And Foldable Ball Pit Large 1 63,283.00 63,283.00 Small Round: 63" Diameter X 15.7"h. Weighs 14.3 Lbs. Holds 4-5 Kids And 1250 3" Diameter Balls. Color: Blue. Small Padding: 63" Diameter X 0.78"h. Weighs 14 Lbs. Small Padding: 63" Diameter X 0.78"h. Weighs 14 Lbs. Large Round: 78.7" Diameter X 15.7"h. Weighs 18.5 Lbs. Holds 6-7 Kids And 1500 3" Diameter Balls. Color: Blue. Large Padding: 78.7" Diameter X 0.78"h. Weighs 18.5 Lbs. Large Padding: 78.7" Diameter X 0.78"h. Weighs 18.5 Lbs. Medium Square: 78.7"l X 47.2"w X 15.7"h X 1.9"d. Weighs 20 Lbs. Holds 4-5 Kids And 1000 3" Diameter Balls. Pistachio, Blue, Orange And Lilac. Medium Padding: 78.7"l X 47.2"w X 0.78"h. Weighs 20 Lbs. Large Square: 78.7"l X 78.7"w X 15.7"h X 1.9"d. Weighs 27.6 Lbs. Holds 6-7 Kids And 1250 3" Diameter Balls. Pistachio, Blue, Orange And Lilac. Large Padding: 78.7"l X 78.7"w X 0.78"h. Weighs 27.5 Lbs. Made Of Pvc Upholstery. Filled With Polyethylene Foam Surface Wash. Air Dry. Unit Platform Swings( 2 Swings) 1 29,040.00 29,040.00 Adjusts In Tilt Using Control Lines Attached To A Top Disc Features A Soft Padded Edge That Prevents Therapist Injury Can Be Used In A Range Of Positions, Including Sitting, Standing, Prone, And Supine Adaptation Provides Security For Clients Who Feel Uncomfortable Taking Their Feet Off The Floor Adaptation Makes It Possible To Introduce Infants And Smaller Children To The Platform Swing Dimensions: 31"l X 31"w X 60"h Working Load: 300 Lbs. Weight: 21 Lbs. Set Indoor Climbing Walls 1 44,776.05 44,776.05 Six Wood Panels Adjustable Anchor Kit (select Either Concrete Or Dry Wall Style) Wall Bracket (required For Adjustable Anchor Kit) Letter Climbing Handholds (sold In Sets Of Six Ea.) Number Climbing Handholds (sold In Sets Of Six Ea.) Character Climbing Handholds (sold In Sets Of Six Ea.) Plain Climbing Handholds (sold In Sets Of Ten Ea.) Set Trampoline With Handrail 2 8,833.00 17,666.00 40-inch Jumping Surface Area Handrail Adjusts From 28.5" To 36.5"h 16lbs. Holds Up To 300 Lbs Black Unit Tumble Barrels 1 38,016.00 38,016.00 Inside Diameter 12" Outside Diameter: 22" Weight Capacity: 250 Lbs Latex Free Set Tactile Walls And Interacitve Equipment 1 126,808.00 126,808.00 Tactile Panel Measures 1820mm Wide X 1800mm High, 400mm To Be Cemented Into The Ground During Install. Set Wall Bars 1 3,509.00 3,509.00 Size: 190*70*10 Material: Beech Wood Or Poplar Wood Weight Bearing:150kgs Moq: 100pcs Set Adl Boards 1 1,149.50 1,149.50 6 Colors, 6 Different Dressing Skills Training. It Is A Good Way To Exercise Your Child's Finger Flexibility And Help The Kids Learn The Most Basic Dressing Skills. Is A Good Parent-child Toy.also A Good Preschool Education And Kindergarten Toys. A Quiet Skill Book Made Of Cardboard And Non-woven Fabric. Suitable For Children 2-7 Years Old. Package Dimensions: 11.73 X 9.76 X 2.28 Inches Item Weight: 1.28 Pounds Piece Horizontal Bolster Swing 1 3,500.00 3,500.00 Piece Sky Walker Swing 1 3,500.00 3,500.00 Piece Cuddle Swing 1 3,500.00 3,500.00 Piece Vertical Bolster Swing 1 3,500.00 3,500.00 Piece Rainbow Cloth Swing 1 3,000.00 3,000.00 Piece Box Swing 1 3,000.00 3,000.00 Piece Cargo Net 1 1,500.00 1,500.00 Piece Rock Wall Climbing 2 2,000.00 4,000.00 Set Crash Mat (5ft., Diameter 2in Thick) 4 4,500.00 18,000.00 Piece Crash Mat (5ft., Diameter 4in Thick) 4 7,150.00 28,600.00 Piece Foam (150cm X 150cm) 5 4,000.00 20,000.00 Piece Heavy Work Barrel 1 1,500.00 1,500.00 Piece Yoga Mat 10mm 2 500.00 1,000.00 Piece Yoga Ball 2 1,000.00 2,000.00 Piece Ball Pit 1 1,500.00 1,500.00 Set Rubber Wiggle Cushion 2 800.00 1,600.00 Set Rubber Hopper Ball 1 1,000.00 1,000.00 Piece Play Tunnel 1 1,500.00 1,500.00 Piece Pediatric Tent 1 2,500.00 2,500.00 Piece Punching Speed Ball 1 2,000.00 2,000.00 Piece Ready Stock Wooden Sorting Stacking Toys For 1-3 Years Old Toddlers Color Recognition Stacker Shape 3 1500 4,500.00 Piece The Learning Journey Lift & Learn Colors And Shapes Puzzle 3 1200 3,600.00 Piece Baby Toys 0-1-3 Year Old Puzzle Tower Children Tower Cup Sets Of Rings 6-12 Months 2 500 1,000.00 Piece Montessori Wooden Educational Toys For Kids Seven In One Traffic Matching Board Free 2 800 1,600.00 Set Montessori Around Bead Maze Gear Game Shape Matching Educational Alphabetic Animal Cognition 2 4000 8,000.00 Piece Wooden Giant Multifunctional Montessori Toy Box 3 1500 4,500.00 Unit Beestech Wooden Lacing Toy, Montessori Toys For Toodlers, 2, 3, Year Olds, Wooden Puzzles Preschool Activities, Fine Motor Skills Early Educational Toys For 2, 3 Years Old 3 1200 3,600.00 Unit Montessori Early Education Montessori Cylinder Socket Sensory Teaching Aids Educational 3 800 2,400.00 Unit Baby Shoe Tying Board Puzzle Shoe Tying Practive Toy With Round Buttons Sneaker Teaching Tie 4 500 2,000.00 Unit Lacing Jumbo Bead Toys 4 500 2,000.00 Unit Toddler Flah Cards-colors, Shapes, Numbers And Alphabet Flahscards 5 500 2,500.00 Unit Baby's First- First Objects Flash Cards -learning Tools For Kids 5 500 2,500.00 Unit 8 Types Of Double Sided Flahs Cards For Educational English Flash Cards, Children's Learning 5 300 1,500.00 Unit Enbe Economical Washable Non-slip Base Carpet E-fl-2001e 40cm X 60cm 2 1200 2,400.00 Unit Bulletin Cork Board 450x600mm/18x25in 2 700 1,400.00 Unit White Board, 50.3cm Height, 89.1cm Width, Magnetic 1 8000 8,000.00 Unit Tissue Paper Pack 5 300 1,500.00 Unit First Aid Kit Cabinet 1 2500 2,500.00 Piece Toilet Package (toilet Bowl With Flush, Sink, Fauet, Soap Dish And Tissue Holder) 1 8000 8,000.00 Set Stapler (big) 2 500 1,000.00 Piece Staples (big) 2 300 600.00 Piece White Board Pen 3 250 750.00 Piece White Board Ink 2 350 700.00 Piece Spray Bottle 2 200 400.00 Piece Laminator (hot And Cold) 1 4000 4,000.00 Piece Laminating Film(long)(125mic) 5 600 3,000.00 Bottle Universal Ink For Computer Printer (black, Cyan, Magenta & Yellow) 12 100 1,200.00 Piece Draw A Person: Screening Procedure For Emotional Disturbance (draw A Person: Sped) 1 19800 19,800.00 Piece Behavior Rating Inventory Of Executive Function - Second Edition 1 90900 90,900.00 Piece Developmental Profile 4 (dp-4) 1 70800 70,800.00 Piece Multiscore Depression Inventory For Children (mdi-c) 1 45000 45,000.00 Piece Autism Diagnostic Interview, Revised (adi-r) 1 65300 65,300.00 Piece Adult Suicidal Ideation Questionnaire (asiq) 1 28550 28,550.00 Meters Multidimensional Anxiety Questionnaire (maq) 1 115300 115,300.00 Sets Wechsler Intelligence Scare For Children – Fifth Edition (wisc-v) 1 390050 390,050.00 Piece Attention-deficit/hyperactivity Disorder Test 2nd Edition (adhdt-2) 1 37000 37,000.00 Glass Asperger Syndrome Diagnostic Scale 1 33,000 33,000.00 Piece Soap Dish 2 35.85 71.70 Piece Powder Detergent 2 228.50 457.00 Set Toilet Cleaning Brush With Holder 2 199.00 398.00 Set Shampoo Large 5 500.00 2,500.00 1liter Piece First Aid Kit And Cabinet 1 1,500.00 1,500.00 Piece Tissue Paper 12 Pcs Pack 8 300.00 2,400.00 Piece Hand Soap 10 50.00 500.00 Set Pans 3 250.00 750.00 Piece Toilet Paper Holder 3 237.60 712.80 Set Dipper 7 39.93 279.50 Piece Pail 9 199.56 1,796.00 Bottles Toothbrush 2 396.00 792.00 Piece Hairbrush 5 150.00 750.00 Piece Comb 10 50.00 500.00 Tube Toothpaste 10 150.00 1,500.00 Piece Plastic Tumbler 15 262.90 3,943.50 Set Razor 10 51.70 517.00 Set Nailclipper 20 74.80 1,496.00 Set Nail File 20 50.00 1,000.00 Set Deodorant 10 380.00 3,800.00 Set Feminine Napkin 10 300.00 3,000.00 Set Dust Catcher With Broom 1 558.40 558.40 Set Feather Duster 5 150.00 750.00 Dozen Sponge 12 10.00 120.00 Pieces Spray Bottle 5 150.00 750.00 Pieces Table Napkins 15 85.00 1,275.00 Pieces Placemat 10 100.00 1,000.00 Set Plates Large Size 5 550.00 2,750.00 Piece Pitcher 5 577.00 2,885.00 Pieces Bowls 30 20.00 600.00 Set Water Pail Large 1 500.00 500.00 Pieces Laundry Bar Soap 12 29.80 357.60 Pieces Clothesline 4 117.60 470.40 Packs Clothes Pins 5 130.80 654.00 Set Wash Basin 2 508.90 1,017.80 Set Laundry Bag 5 396.80 1,984.00 Pack Hangers 10 149.75 1,497.50 Pairs Socks 10 50.00 500.00 Piece Dress 1 275.00 275.00 Piece Dish Organizer 1 4,500.00 4,500.00 Sets Bed Sheets 4 1,899.00 7,596.00 Pieces Curtain 6 200.00 1,200.00 Piece Alarm Clock 1 446.60 446.60 Pcs Reading Stand 20 350.00 7,000.00 Piece Portable Generator Set 1 30,000.00 30,000.00 1250wx60hz Max Output, 1100w Rated Output Unleaded Gasoline 3.0hp Piece Trolley Table 1 4,300.00 4,300.00 Sets Canister With Scoop 6 200.00 1,200.00 Unit Learners'/clients' Chart Materials 10 254.10 2,541.00 Set Anatomical Models 1 37,873.00 37,873.00 Unit Blood Pressure 2 3,410.00 6,820.00 Unit Stethoscope 2 1,067.00 2,134.00 Piece Tape Measure 2 115.50 231.00 Piece Hand Dynamometer 2 1,650.00 3,300.00 Pack Ice Massage Caps 3 572.00 1,716.00 Unit Adjustable Height Exercise Steps 1 3,300.00 3,300.00 Piece Pediatric Examination Gowns 5 2,057.00 10,285.00 Piece Bath Towels 5 2,860.00 14,300.00 Material: High Quality 100% Cotton Terry – 500gm2. Size: 90 X 180cm. Pack Bed Sheets 1 2,000.00 2,000.00 Waterproof 5.5 Mil Vinyl Contoured Corners, Fitted 36" X 80" X 6" Case Of 12 Set Pillowcase 4 165.00 660.00 Piece Blankets 4 330.00 1,320.00 100% Canadian Cotton, Soft Texture, High Quality Fabric Size: 52 X 90 Inch Unit Step Stools 2 1,980.00 3,960.00 Double Steel Caravan Step. Rubber Non- Slip Steps. Leg Distance Front To Back 65 Cm. Width 42 Cm. Top Step Height 38 Cm. Bottom Step 20 Cm. Unit Therapist Stools On Wheels 2 3,212.00 6,424.00 Description: This Stool Can Be Adjusted To Just About Any Position You Want, Making It Incredibly Versatile And Comfortable. It Has A 360-degree Swivel So You Can Quickly Spin Around To Access Anything You Need At Home Or In The Office. The Unique Saddle Seat Has Thick Padding, Making It Easy For You To Stay In The Same Place For Hours At A Time. Piece Kinesiology Tape 5 1,034.00 5,170.00 Ultra-strong And Sticky-hypoallergenic Adhesive Water Resistant 97% Cotton, 3% Nylon 180% Stretch For Full Range Of Motion Latex And Zinc Free Sticks 2-7 Days 5-10 Applications Per Roll Each Is 2"x 16.4" (5cmx5cm) Gloves Gloves 2 180.00 360.00 Box Bubbles 5 200.00 1,000.00 Box Ballon 3 200.00 600.00 Box Playdough 3 250.00 750.00 Box Sad Box 2 250.00 500.00 Set 40 Pack Brick Block Set 12x6x3 1 8,542.50 8,542.50 Piece Puzzle Games Educational 5 300.00 1,500.00 Set Flash Cards Animals,colors, Numbers, Shapes 10 300.00 3,000.00 Piece Doctor Set Toy 1 700.00 700.00 Piece Cooking Set Toy 1 700.00 700.00 Piece Tool Set Toys 1 700.00 700.00 Piece Magnetic Fishing Toy 1 500.00 500.00 Piece Story Books With Integration Of Math,science,epp 20 150.00 3,000.00 Piece Containers Jar Plastic 10 50.00 500.00 Box Whistle 1 280.00 280.00 Box Baby Tether 10 80.00 800.00 Pack Figure Toys 5 300.00 1,500.00 Piece Shape Sorter 1 400.00 400.00 Piece Ring Stacking Toys 2 200.00 400.00 Pack Balls (plastic Balls) 2 250.00 500.00 Box Tongue Depressor 5 200.00 1,000.00 Set Communication Boards 3 5,082.00 15,246.00 Book And Cards Specification: Binder Features Two Interior Storage Pockets For Loose Materials, Color Black, And It Measures 9x7.5 Convenient To Travel And Put In Your Child's Backpack Or Carry In Hand. Binder Comes With 5 Different Colorful 10 Mil Poly Dividers, 3 Hard Strips (hook) Attached On Each Side To Hold 30 Cards. Each Card Measures 1.5 X 1.5. Inch Mounted With 1/2-inch Soft Dot (loop), And Round Corner Cut Safe For Little Hands From Scratching And Poking. Set Dry Erase Sleeves 5 550.00 2,750.00 Set Wind Up Toys 1 1,140.70 1,140.70 Piece File Folders 10 110.00 1,100.00 File 2 Rings 2" Thick Or 3" Thick From Cover To Cover Front , Inside And Back Cover Are All Same Cover Size: Long 14"l X 11"w X 3" Thick Color(s): Black, Blue, Green, Red Set Articulation Cards Super Duper Publications Set Of 7 Webber Articulation Card Decks With Animal Artic Pairs Combo Set 3 Educational Learning Resource For Children Super Duper Publications Super .. 1 13,302.85 13,302.85 Set Cognitive Cards For English Vocabulary In Early Childhood Education For Infants And Young Children,high Frequency Sight Word Flash Cards For Kindergarten Homeschool Supplies . 3 250.00 750.00 Set Single Vowels Double Vowels Single Consonants Double Consonants Sino Korean Numbers (useful Numbers Only) Pure Korean Numbers (useful Numbers Only) Months Of The Year Days Of The Week Telling Time Basic Words And Phrases Around The House 3 250.00 750.00 Pc 220 Sight Words High-frequency Poster Educational Set 10pcs Charts Vocabulary Building English Words Learning Materials For Kids Preschoolers Toddlers Classroom Wall Decorations Eeading Comprehension Prctice A4 Big Card 5 200.00 1,000.00 Pc 4 Pack Small Whisper Phones Speech Therapy Toys For Reading & Auditory Feedback - Hear Myself Sound Phone 8 250.00 2,000.00 Pc Word Sentence Pocket Charts Classroom Chart Standard Pocket Chart 5 636.00 3,180.00 Piece Adaptive Swim Life Jacket For Disabled 2 2,872.00 5,744.00 Piece White Bath Towels 15 379.75 5,696.25 Piece Broom With Dustpan Plastic 1 349.75 349.75 Set Hanger 12 Pieces Per Set 12 149.75 1,797.00 Piece Bath Soap 15 50.00 750.00 Set Wood Bathroom Mirror Cabinet 1 4,886.00 4,886.00 Piece Googles-silicon Strap Ywg278 6 99.50 597.00 Piece Ditrio Swim Ring Assorted Design And Color 2 279.50 559.00 Piece Ditrio 80 Cm Swim Ring Dino Design With Handle And Glitters Sya2061 2 279.50 559.00 Piece Spence Pvc/h Swim Goggles 6 199.00 1,194.00 Piece Inflatables Sports Ball 3 59.75 179.25 Piece Watermelon Design Swim Ring 70cm 4 179.50 718.00 Piece Beach Ball Colored Plastic 4 149.00 596.00 Piece Beach Volley Ball White Color 5 119.00 595.00 Piece 80 Cm Swim Ring Assorted Design Sya 6 159.50 957.00 Piece Swim Vest Small Ywsyb5022 4 259.50 1,038.00 Piece Swim Vest Medium Ywsyb5025s 4 159.50 638.00 Piece Swim Vest Large Ywsyb5023 4 199.50 798.00 Piece Water Gun 2 99.50 199.00 Piece Raion B/c Water Blaster 2 229.00 458.00 Piece Spence Pvc/h Swim Goggles 2 249.00 498.00 Piece Inflatable Md (1234619595506) 3 49.00 147.00 Piece Inflatable Md (1234614252) 3 79.00 237.00 Piece Bulletin Board 1 599.00 599.00 Piece Shoe Rack Platic/steel 2 699.75 1,399.50 Pieces Ball Pins 5 97.90 489.50 Pieces Acrylic Color Set 20 580.00 11,600.00 Pieces Cutters 20 68.00 1,360.00 Sets Watercolors 15 415.80 6,237.00 Reams Art Paper (multiple Colors) 20 218.90 4,378.00 Set Paint Brushes 15 250.00 3,750.00 Pieces Yarn Assorted Colors 20 71.50 1,430.00 Sets Colored Pencils 15 396.00 5,940.00 Sets Colored Pens 15 119.90 1,798.50 Pieces Sewing Pins 20 16.50 330.00 Pieces Sewing Needles 20 22.00 440.00 Pieces Rotary Cutter 10 159.50 1,595.00 Pieces Tape Measure 10 27.50 275.00 Pieces Crochet Hooks 15 284.90 4,273.50 Pieces Knitting Needles 15 104.50 1,567.50 Pieces Crochet Thread 20 45.10 902.00 Boxes Sewing Thread Assorted Colors 20 60.50 1,210.00 Pieces Studio/painting Easel 5 550.00 2,750.00 Pieces Manual And/or Electric Pencil Sharpener 5 64.90 324.50 Pieces Wooden Mannequin With Stand 1 1,200.00 1,200.00 Pieces Transparent Edge T-square 5 660.00 3,300.00 Sets 1 Toolset L Tool Set L Carpentry Tools L Maintenance Home Tools L Accessory Repair Tools L Taclight L Tac Light L Military Flashlight L Ultra Bright L Rechargeable Battery And Charger 2 1,493.80 2,987.60 Pieces T50 Staple Gun With Staples 10 163.90 1,639.00 Piece Slop Sink Stainless Large 2 9,075.00 18,150.00 Pieces Roofing Square Dual Marking Right Angle Picture Framing Carpenter Ruler 5 148.50 742.50 Pieces Professional Compound Mitre Box & Saw 10 533.50 5,335.00 Pieces Drawing Lamp 5 768.90 3,844.50 Pieces Chisel Rack For Wood Carving 5 1,042.80 5,214.00 Pieces Corner Clamp 10 211.20 2,112.00 Sets Decorative Realistic Artificial Fruits 2 589.60 1,179.20 Sets Geometric Shapes Set 2 1,760.00 3,520.00 Pieces Geometric Designer Templates 2 306.19 612.37 Pieces Stack Rack 2 5,608.90 11,217.80 Pieces Picture Frame And Miter Clamp 20 180.00 3,600.00 Pieces Heat Gun 5 770.00 3,850.00 Pieces Hot Plate Single Electric Stove 5 162.80 814.00 Pieces Tape Dispenser 5 107.80 539.00 Pieces Multi-function Three-hole Puncher 5 330.00 1,650.00 Pieces Metric Scale 8 55.00 440.00 Pieces Steel Tape Measure 15 Ft Or More 5 330.00 1,650.00 Pieces Heavy Duty Circular Saw 4 2,310.00 9,240.00 Pieces Abrasive Disc Cutter Machine 2 6,600.00 13,200.00 Set Manual Canvas Pliers 3 440.00 1,320.00 Sets Jet-bow Compass Set 5 220.00 1,100.00 Set Human Head Model 1 2,500.00 2,500.00 Sets Screw Drivers Set With Box 3 450.00 1,350.00 Sets Pliers And Grip Set 40 In 1 With Box Set 4 1,800.00 7,200.00 Pieces Artist Stool With Wheels 10 600.00 6,000.00 Pieces Screen Print Squeegee 10 500.00 5,000.00 Pieces Mixing Paint Palette 10 550.00 5,500.00 Sets Carving Chisels For Wood 5 550.00 2,750.00 Sets Files Set For Jeweler, Wood Carving, Craft Metal And Glass Stone 2 1,100.00 2,200.00 Pieces Heavy Duty Multi-purpose Bench Vise 2 1,320.00 2,640.00 Piece Anvil 1 880.00 880.00 Pieces Welding Protective Suite 5 500.00 2,500.00 Pieces Welding Apron 5 250.00 1,250.00 Pieces Welding Hood Caps 5 440.00 2,200.00 Pieces Welding Gloves 10 176.00 1,760.00 10.5" Welding Leather Gloves Hgvc01 *winland* Product Description • Size: 10.5" • Use For Driver, Machining Operator Etc. • All Applications Which Require A High Level Of Anti-skid And Abrasion-resistant • Applying Universally To The Transporting And Cargo Handling Workers, Recycling Work, And Horticulture Workers, Drivers And Etc. • Cow Split Leather Gloves • Full Palm, Full Lining • Made With Top Quality Material For Industrial And Commercial Use Pieces Welding Protective Visitor Glasses 4 99.00 396.00 Protective Visitor Glasses: Anti-fog With Uv Protection Glasses Product Name:safety Eyewear Glasses Color:clear, Dark Grey Feature:protective Glasses Lens Color:clear, Dark Grey Style:work Safety Glasses Package:blister Size: 17*17*7cm Pieces Welding Helmet With Auto Darkening 2 500.00 1,000.00 Auto Darkening Welding Helmet Ahm009 Viewing Area:90×35mm Cartridge Size:110×90×10mm Arc Sensor:2 Light State:din 4 Dark State:fixed Shade 10 Shade Control:unadjustable Power On/off:fully Automatic Sensitivity Control:unadjustable,auto Uv/ir Protection:din 16 Power Supply:solar Cells. Re-chargeable Battery .no Battery Change Required Switching Time:1/5000s,from Light To Dark Dark To Light:0.15-0.45s Auto Low Amperage Tig:≥20amps(dc), ≥20amps(ac) Operating Tep:-5°c~+55°c Storing Tep:-20°c~+70°c Pieces Welding Mask 2 440.00 880.00 Product Details Of Heavy Duty Welding Mask (108x50x3mm) Movable Glass Impacted Resistant Shell Anti Wear Moveable Type Glass Packing: Polybag With Color Sticker Pieces Hard Hat 12 330.00 3,960.00 Hard Safety Helmet With Chin Strap Color: Blue, Orange, White, Yellow Material: Acrylonitrile Butadiene Styrene (abs) Shell, With Six Point Adjustable Ratchet Suspension For Shock Absorbing And Elastic Chinstrap Tough, Lightweight, Durable With Six Point Adjustable Ratchet Suspension For Shock Absorbing And Elastic Chinstrap. A Hard Hat Is A Type Of Helmet Predominantly Used In Workplace Environments Such As Industrial Or Construction Sites To Protect The Head From Injury Due To Falling Objects, Impact With Other Objects, Debris, Rain, And Electric Shock. Durable, Lightweight And Comfortable Piece Heat Press Transfer Machine 1 9,900.00 9,900.00 Electric Powered 21.2 X 20.2 X 19.2 In. 220v 1800w 0-400˚f (0-220˚c) 0-999 Sec. Pieces Rubber Mallet 4 330.00 1,320.00 Rubber Hammerhead Fiberglass Handle Packing: Color Label Weight: 32oz Pieces Ball Peen Hammer 4 330.00 1,320.00 Material: Fiberglass Handle & Steel Head Size : 16 Ounce Weight: 3.7 Pound Pieces Cutting Mat 6 550.00 3,300.00 Flexible Cutting Mat A2 Size (24 X 18 Inch) Self-healing 5 Layered Double Sided With Marked Pattern And Grids (green) Material: Polyvinyl Chloride Color: Green Item Dimensions: 15 X 15 X 15 Centimeters Shape: Hexagonal Weight: 200 Grams Pieces Soft Box With Stand 2 1,147.41 2,294.82 Pieces Monolights 2 2,875.40 5,750.80 Pieces Reflector With Holder 2 3,800.00 7,600.00 Pieces Boom Light Stand And Reflector Holder 1 4,654.93 4,654.93 Piece Display Panel Board 1 11,909.70 11,909.70 Pieces Offline Mini Compressor 1 5,489.00 5,489.00 220v 60hz, Type: Single Cylinder Piston Compressor With Air Tank, Power: 1/6hp, Speed: 1700r.p.m, Air Output Per Min/lit.:20-23l/min, Auto Stop, Start At 3bar (43 Psi) Stop At 4bar (57psi), Working Pressure:0-4 Bar, Air Tank:3.0l, Suitable For Airbrush With Nozzle 0.2mm-1.0mm, Weight: 5kg, Dimension: 31x13x31cm Piece Styrofoam Cutter 10 204.40 2,044.02 Material:plastic, Size:approx. 190x90mm, Power: 2xc Size Battery (not Included), Feature: Electric Wire Needle Shap, Stainless Steel Wire, Hardness And Diameter Of 0.19mm Piece Weather-proof Safety Box Circuit Breaker 1 1,862.68 1,862.68 Metal Enclosure Panel Box, Weatherproof, Height:300mm, Depth:150mm, Door: 0.8mm, Body: 0.8mm, Plate: 0.8mm, Metal Body,width:400mm Pieces Fire Blanket 4 638.00 2,552.00 120x99x4cm (l X W X H) Woven Glass Fiber Pieces Exhaust Fan 5 968.00 4,840.00 Size: 12" 9" 6" Rpm: 1350, 1320, 1290 Finish: Power Coated Pieces Disposal Bins Large 2 1,652.20 3,304.40 50 Cubic Movable Bins Pieces Portable Welding Machine 1 8,500.00 8,500.00 Piece Dressmaking Shears 4 500.00 2,000.00 Pieces Reading Stand 3 2,055.22 6,165.67 Piece Plasma Display 1 10,000.00 10,000.00 Set Fire Extinguiser 12 4,000.00 48,000.00 10lb Piece Track Pad 1 650.00 650.00 Bottle Bottled Water For Dispenser Gallon 8 268.75 2,150.00 Piece Garbage Bin 13 376.92307 4,900.00 Piece Facetowels 42 95.45 4,008.90 Pair Slippers 21 119.05 2,500.00 Set Of 6 Drinking Glasses 23 798.26 18,360.00 Pieces Scissors Large 25 169.10 4,227.50 Pieces Glue (big) 30 110.60 3,318.00 Piece Wash Rags 25 142.00 3,550.00 Piece Scotch Tape 10 130 1,300.00 Set Of 6 Tea Cups With Saucer And Teaspoon 22 395.94 8,710.70 Set Mirror 1 9,740.50 9,740.50 Aluminum Frame (thickness 1/4 Inch X 4 X 8 Ft) Piece Gym Mirror 2 12,000.00 24,000.00 Aluminum Frame (thickness 1/2 Inch X 4 X 8 Ft) Piece Home Gallery Tornado Mop And Spin Dry Bucket Set 11 704.431818 7,748.75 Piece Pillows 15 397.33 5,960.00 Pillow Shape: Rectangle Pillow Weight: 0.95-1000 Grams Pillow Height: 12.7cm Pillow Width: 40.64cm Pillow Length: 66.04cm Pillow Size: 40 X 66 Cm Pillow Material: 100% Cotton Pillow Filing: Cotton Poly-fiber Pieces Chef’s Knife 3 1,639.00 4,917.00 Stainless Steel Chef Chopping Knife Household Kitchen Knife Size: 8 Inches Blade Material: 3cr14 High Carbon Stainless Steel Blade Handle: Pom Handle Pieces Boning Knife 2 1,177.00 2,354.00 6″ Boning Knife Chef’s Edge Handles Are Ergonomically Designed To Minimize Wrist Tension And Provide A Natural Fit. Heat Treatment Process Makes The Knives Extremely Sharp And Corrosion Resistance. Country Of Origin: Germany Blade Material: 3cr14 High Carbon Stainless Steel Blade Handle: Pom Handle Pieces Oysters Knife 2 203.50 407.00 Material: Stainless Blade, Plastic Handle Size: 16 Cm Easily Pry Open Oyster/clam Shells Sharp, Beveled Blade Pieces Cleaver Knife 2 660.00 1,320.00 Butcher Cleaver Knife With Ergonomic Design Highly Corrosion Resistant Stainless Steel Wooden Handle Handle Length Measures 5" Blade Length Measures 8" Long And 3.5" Wide Dishwasher-safe Blade Material: Stainless Steel Color: Stainless Steel Handle Material: Wood Blade Edge: Plain Pieces Tenderizer (pin Tenderizer) 2 286.00 572.00 Stainless-steel Prongs Break Down Tough Meat Fibers. Also Useful For Piercing Meats Before Marinating. Heavy-duty Spring-loaded Mechanism Controls Action Precisely. A Practical Solution For Turning A Tough Cut Of Meat Into A Delicious, Tender Piece Of Meat. Type: Meat Tenderizer Material: Stainless-steel, Abs Size: 5cm X 5.1cm X 19.4cm/1.97" X 2.01" X 7.64" (approx.) Pieces Tenderizer (mallet Tenderizer) 4 715.00 2,860.00 Material: Aluminum Weight:100g Size: Length: 19.5cm; Hammer: 4.5 * 4.5cm Integrated Aluminum Construction For Strength And Durability. There Are Two Sides. Use The Spiked Surface To Tenderize And The Flat Surface To Pound Meat. Ideal For Beef, Veal, Pork And Chicken, Etc. Package Content: 1x Two Side Meat Hammer Pieces Skimmer, Fine 4 62.70 250.80 6"x5"length Width 5" Handle: Length11 5/8 Material: Nickel-plated Stainless Steel Handle Material: Nickel Plated Pieces Wire Skimmer, Small 4 96.80 387.20 3" Diameter X 1"depth 13.75 Handle Length Material: Stainless Steel, Bamboo Handle Pieces Skimmers, Spider 2 1,705.00 3,410.00 Mesh Basket Tool(5inches) Material:18/8 Stainless Steel, Style Stainless Steel Mesh, Asian, Color: Silver Pieces Strainer, Small, Fine 4 132.00 528.00 Material: Stainless Steel Diameter: Approx. 8.5cm / 3.35 Inch Total Length: Approx. 22cm / 8.66 Inch Handle Length: Approx. 11.2cm / 4.41 Inch Color: Silver/golden/copper Plating (optional) Package Includes: 1 Piece Fine Mesh Stainless Steel Cocktail Strainer Pieces Colander Strainer 4 165.00 660.00 Type: Colanders & Strainers Item Type: Pearl Milk Tea Colander Material: 100% Food Grade Stainless Steel Temperature: -40f To +446f (-40c To +230c) Multiple Use Kitchen Gadgets: Kitchen Helper Feature: Made Of Premium Stainless Steel, No Toxic Chemicals, Lead Free, Pvc Free. The Versatile Design Will Fit Nearly All-round Pots, Pans And Bowls. Uses: For Hot Pot Eating, Soup Draining And Pearl Food Holding. Pieces Siever,small 4 440.00 1,760.00 Stainless Steel Fine Mesh Strainer Material: Stainless Steel; Diameter: 12 Inches; Depth: 2 Inches To 2.5 Inches; Fine Mesh:0.025mm To 0.5mm; Pieces Strainer,medium Fine 8 182.60 1,460.80 Strainer Type: Easy-grip Colander Medium:stainless Steel:item Dimensions:lxwxh: 8x4x0.2 Inches Pieces Turner, 3” X 6” 4 286.00 1,144.00 Item Dimension: L40.1 Cm X W9.6 Cm X H13.4 Cm Item Weight: 0.3 Kg Material: 18/10 Stainless Steel Tool Head & High Impact Nsf Approved Polypropylene Textured Handles (pro-gourmet) Lightweight & Easy To Hold Accommodates Right- And Left-handed Users Use & Care Easy To Clean And Dishwasher Safe. Pieces Spatula 4 264.00 1,056.00 Stainless Steel Teppanyaki Spatula L 14.8cmxw11.8cmxh 2cm Pieces Wooden Spoon 8 143.00 1,144.00 Material: Beech Wood Color: Wood Color Size: 26.3cm X 6.3cm Pieces Parisienne Scoop 8 60.50 484.00 Stainless Steel Baller Heads - 22mm Diameter And 25mm Diameter. Head Include Small Air Hole For Easy Release. Non-slip Handle Made From Fibrox - Tpe Plastic Able To Withstand Temperatures Of Up To 80°c - 110°c. Dishwasher Safe. Pieces Zester 8 220.00 1,760.00 Durable And Rust Resistant Stainless Steel Material Five Sharp Zester Holes That Quickly And Easily Zest Lemons, Oranges, And Other Citrus Fruits Built-in Channel Knife That Peels Citrus Fruits To Make Beautiful Garnishing Easy To Grip Stainless Steel Handle For Steady Control When Testing With A Built-in Hole For Easy And Proper Storage Easy To Clean And Dishwasher Safe Dimensions: L16.3 X W2.4 X H16.3 Cm Sets Piping Bag 4 352.00 1,408.00 Size: Small: About 26cm Long, About 15cm Wide At The Opening, Medium: About 30cm Long, About 17cm Wide At The Opening, Large: About 34cm Long, About 21cm Wide At The Opening. Material: Silica Gel Package: 6 * Small Connectors 2 * 12-inch Bags 2 * 14-inch Bags 2 * 16-inch Bags Pieces Pastry Tubes 8 85.80 686.40 8pcs/set Stainless Steel Pastry Piping Nozzles Size: Approx. 30cmx17.5cm; Material: Eva And 430 Stainless Steel Pieces Strainer Chinois,small 1 3,478.20 3,478.20 Commercial Grade Quality China Cap Strainer With Pot Ring Hang Hook Coarse Mesh - 10" Handle, 8" Diameter, 8" Deep", 18" Total Length Material:18/8 Stainless Steel Color:silver Item Dimensions: Lxwxh 17.13 X 8 X 7.75 Inches Item Weight:0.71 Lbs Pieces Filling Funnel 4 165.00 660.00 Material:304 Stainless Steel Size Dimension:14x11cm Pieces Measuring Spoon 6 165.00 990.00 Material: Stainless Steel , Weight:110g Size:1/8 Tsp-length: 4.25″,diameter: 0.59″ 1/4 Tsp-length: 4.33″,diameter: 0.71″ 1/2 Tsp-length: 4.45″,diameter: 0.91″ 1 Tsp-length: 4.60″,diameter: 1.10″ 1/2 Tbsp-length: 4.72″,diameter: 1.26″ 1 Tbsp-length: 4.92″,diameter: 1.57 Pieces Tongs, 9 Inches 10 53.90 539.00 Material: 304 Stainless Steel With Silicone Handle; Size:9 Inches; Feature: Ring Pull Locking System, Scalloped Heads Pieces Tongs, 12 Inches 5 165.00 825.00 Material: 304 Stainless Steel With Silicone Handle; Size:12 Inches; Feature: Ring Pull Locking System, Scalloped Heads Set Measuring Cup 1 253.00 253.00 Material: 304 Stainless Steel; Feature: 4cups/set. 100ml, 50ml, 15ml And 5ml Cup Sizes On A Storage Ring; Piece Measuring Urn 1 598.40 598.40 Specification: 500ml Colour: Silver Material: 304 Stainless Steel Pieces Ice Cream Scoop 4 154.00 616.00 Size: 18*4.2cm/18*4.8cm Color: Black/silver Material: Aluminum Alloy; Feature: Anti-freeze Ice Cream Scooper With Comfortable Handle Pieces Cheese Cloth 6 150.70 904.20 *made Of Natural Cotton, Never Been Dyed Or Bleached. It's Safe And Healthy To Use And There Is No Color Will Dye Over The Cheese, Yogurt, Turkey Or Any Other Foods. *due To Tight-weave Mesh, It Can Filter More Impurities And Work Efficiently. *it Could Be Used For Making And Wrapping Homemade Cheese. It Is Used As Greek Yogurt Or Butter, Almond Milk Or Nut Milk, Fruit Juice. Furthermore, More Impurities Will Be Filtered Out When You Filter Cold Brew Coffee Or Homemade Beer Wort, Honey And Etc. Specification: *material:cotton *color:as Show *size:100 X 120 Cm/39.3 X 49.2 In Pieces Serving Spoon 15 187.00 2,805.00 Material: 304 Stainless Steel Color: Silver Size: 24cm Set Pepper And Salt Grinder 4 110.00 440.00 Size: 5.3cm/2.09"x 19cm/7.48"; Material: Stainless Steel Case Grinder With High Quality Glass Container Unit Weighing Scale, 5 Kgs 2 1,661.00 3,322.00 Type:hanging Scale Origin:cn(origin) Size:18.5*14*1.9cm Rated Load:other Display Type:lcd Digital Screen Power Supply:3*aaa Battery(not Included) Certification:ce Model Number:electric Scale Capacity:10kg/1g,3kg/5kg/0.1g Is Smart Device:no Color:black Unit:g, Lb, Oz Measuring Range:10kg/10g, 3kg/5kg/1g Material:new Abs Engineering Plastic + Stainless Steel Backlight:yes Ftion 1:kitchen Scales Ftion 2:jewelry Scales Ftion 3:electronic Scales Ftion 4:electronic Balance Pieces Core Seed Remover 8 72.60 580.80 Effortlessly Remove Cores From Fruit Simply Push The Stem Into The Core Of The Apple And Twist To Remove Ultra Stainless Steel Coring Blade Twist And Slide Body For Easy Core Removal Length: Approx. 180mm / 7inch Diameter Of The Core: Approx. 2cm / 0.8 Inch Material: 304 Stainless Steel Pieces Wire Whisk,small 8 185.90 1,487.20 Material: Stainless Steel; Size: H01-8 Inch:21*5cm; Pieces Wire Whisk, Medium 8 220.00 1,760.00 Material: Stainless Steel; Size: H02-10 Inch:26*6cm; Pieces Wire Whisk, Heavy Duty 2 220.00 440.00 Material: Stainless Steel; Size: H03-12 Inch:29*6cm Piece Can Opener 1 121.00 121.00 Material: Stainless Steel + Pp Plastic Size: 19.5cm X 7.5cm Color: Silver + Black Features: 1. 100%brand New And High Quality 2. Ergonomic, Non-slip Grip, Comfortable And Safe In Operation. 3. High-quality Stainless Steel Material, Won't Break Or Bend, Corrosion Resistant, Smooth Felling And High Durability. 4. Rotating Handle And Precision Gears, Efficient And Labor Saving, Children, Adults And The Elderly Can Easily Work With. 5. It Combines 3 Functions In One Unit. This Versatile Can Opener Is Designed For Opening A Can Lid, Opening A Bottle Cap, Levering Or Loosening A Can Lid. 6. Easily Pierce And Open Various Types Of Cans, Like Tin Can, Oil Can, Milk Can, Cat Dog Food Can, Metal Can, Beer Can, Small Can, Large Can, Water Bottle, Jar Etc 7. High Quality Food-grade Material - The Sharp Cutting Disc Is Made Of Food-grade Material Especially The Metal Tooth Is Made Of Stainless Steel, Please Rest Assured Use. 8. No Dangerous Sharp Edges - Protect Yourself And Your Family With This Tin Opener That Leaves Edges Completely Smooth. Safely And Easily Opens Big And Small Cans In All Shapes And Sizes In Seconds. 9. Comfortable And Convenient For Storage - The Opener's Soft, Anti-slip Handles Are Easy To Grip - Which Is Especially Handy For Senior Citizens. You Can Store It In A Drawer Or Simply Hang It On A Hook In Your Kitchen. Pieces Multi-purpose Kitchen Scissors/shears 5 326.70 1,633.50 Material: Stainless Steel Size: 21 X 9 Cm; Features: Extra Sharp For Cutting Meat, Poultry Or Fish With Cracking And Bottle Opening Function Pieces Soup Ladle, 4 Oz 8 71.50 572.00 Material: 18/10 Stainless Steel With Hole On Handle Serving. Size: Length 34cm*diameter 7.5cm Pieces Soup Ladle, 6 Oz 8 71.50 572.00 Material: 18/10 Stainless Steel With Hole On Handle Capacity: 6 0z; Handle Length:3 Inches; Size: Length 34cm*diameter 9.5cm Pieces Soup Ladle, 8 Oz 3 1,210.00 3,630.00 Color: Stainless Steel Material: Stainless Steel Style: 8 Oz Ladle Item Dimension Lxwxh: 14.6 X 2.5 X 3.9 Pieces Soup Ladle, 12 Oz 2 1,210.00 2,420.00 Soup Ladle Food Grade Rust-proof Stainless Steel Dishwasher Safe Hot Pot Soup Ladle Length: 18 Width: 4.6 Height: 2 Freezer Safe: Yes Type: Gravy / Sauce Ladles Dishwasher Safe: Yes Microwave Safe: No Capacity: 10.0-14.9oz Feature: Heavy Duty Pieces Kitchen Spoon 8 220.00 1,760.00 Mirror Finished Durable Stainless Steel Material Dishwasher Safe Ss Dinner Spoon 4.0mm Thickness Length: 21cm Weight: 73gm Pieces Kitchen Spoon, Slotted 5 660.00 3,300.00 Stainless Steel Slotted Spoon Is Ideal For Stirring And Straining Pasta Or Vegetables. The Soft, Non-slip Handle Cushions Your Hand During Use, And The Polished Stainless Steel Is Both Sleek And Durable. Dimensions: 2 X 2.75 X 12.4 Weight: 0.29 Pieces Kitchen Fork 2 1,650.00 3,300.00 Color: Silver Substance: 18/10 Stainless Steel Surface Finishing: Matt/polished Net Weight: 0.11 Kg Length: 33.40 Cm Width: 2.50 Cm Height: 1.90 Cm Handle Length: 12.50 Cm Pieces Carving Fork 2 1,320.00 2,640.00 Package Dimensions: 13.07 X 1.42 X 0.87 Inches (33.2 X 3.6 X 2.2 Cm) Item Weight: 5.6 Ounces (158.76 Grams) Handle Material: Stainless, Stainless Steel, Abs, Plastic, Steel Pieces Digital Kitchen Thermometer 3 127.60 382.80 Digital Kitchen Food Thermometer For Meat Cooking Water Milk Food Probe Temperature Temperature Range: -50°c To 300°c Or -58°f To 572°f Resolution: 0.1°c Or 0.1°f Accuracy: ± 1°c Or ± 1 °f Optional Temperature Unit: °c / °f Material: 304 Stainless Steel & Abs Plastic Buttons: On/off, °c/°f, Hold Power Supply: 1 X 1.5v Lr44/ag13 Battery (not Included) Power Saving: Auto Power Off After 10 Minutes Total Length: 24.6cm Probe Length: 14.5cm Set Multi-function Vegetable Fruit Peeler Slicer Cutter Chopper 2 290.40 580.80 Stainless Steel Multifunction Fruit And Vegetable Peeler Slicer Shedder Peeler 5 Different Inserts With 11 Different Ways To Cut Cut Into Cubes Or Sticks In 3 Different Sizes Slices In 2 Different Thicknesses Cut In To Quarters, Eighths And Wedges Long- Lasting Super- Sharp Stainless Steel Blades Extra Sharp Grater Mandolin Slicer With Safety Food Holder 1 X Cutting Top With Integrated Stylus 1 X Cutting Base 1 X Transparent Collecting Container (capacity 1,500 Ml) 1 X Fresh Cover For Collecting Container 1 X Knife Insert (6 Mm X 6 Mm Or 12 Mm X 12 Mm) 1 X Knife Insert For Quarter Or Eighth 1 X Planer Insert With Blade Protection 1 X Food Holder With Guide 1 X Detachable Cutting Punch For Eighth 1 X Part Cover For All Knife Inserts Pieces Stock Pot (big) 2 6,270.00 12,540.00 Stainless Steel Large Stock Pots Casserole Stew Pan Type: Soup & Stock Pots Material: Metal Type: Stainless Steel Feature: Eco-friendly Applicable Stove: General Use For Gas And Induction Cooker Product Name: Soup Pot Usage: Soup, Milk, Noodle Pot, Cooking Pots Shape: Straight Material Type: Stainless Steel Diameter: 25 / 30 / 35/ 40 /45/ 50 Cm Pieces Frying Pan, Small 4 990.00 3,960.00 Frying A Single Egg, Sausages, Seafood, Poultry, Burgers Or Vegetables, Toasting Pine Nuts Or Even Toasting Off Some Spices. Specification: Pot Diameter: 13cm Pot Height: 2.8cm Full Length Of Pot Body: 25cm Pot Bottom Diameter: 11.5cm Included: 1 X Mini Saucepan 12cm Small Nonstick Frying Pan For Household Fried Egg Pancakes Round Mini Saucepan Pieces Frying Pan, Medium 4 385.00 1,540.00 Material: 304 Stainless Steel Size Diameter: 32cm Feature: New Technology Experience, New Design Suitable For: General Use For Gas And Induction Cooker Product Features: 1.13.4 Inch Stir Fry Pan Made Of Stainless Steel, Nonstick Cookware Interior Is Honeycomb Texture, Achieve Separation State Nonstick. Pieces Frying Pan, Large 2 1,980.00 3,960.00 Material: Carbon Steel Wok Handle: 12cm Wood (beechwood) Diameter: 36cm Depth: 10.5cm Handle Socket: Welded Non-stick Pan, Perfect For Your Daily Home Cooking Pieces Colander, Small 3 132.00 396.00 Ergonomic Design, Smooth Handle Grip. Top Hanging Ring Design, Free To Hang Up. Specification: Material: Stainless Steel Size: 32 * 10cm / 12.60 * 3.94" Color: As Shown Package Included: 1pc * Colander Pieces Colander, Medium 2 220.00 440.00 Features And Usage: Good Quality Stainless Steel Material With Competitive Price Can Be Used For Strain Soup, Juice, Milk, Tea, And Other Liquids. Strong, Sturdy, And Durable. Made For Heavy Work. Rust, Crack, And Stain Resistant Easy To Clean And Carry High, The Goods Quality Support With Your Demand. The Long Handles Protect Your Hands From Hot Grease And Oils While Letting You Cook Your Favorite Foods Product Name: Stainless Kitchen Wire Skimmer/strainer/colander Material: Stainless Steel Size / Capacity: 22cm Color: Silver Shape, Round Type: Strainer Item Number: 22cm F/h Skimmer Pieces Cutting Board 4 165.00 660.00 Packing: 1 X 1pcs Chopping Board Material: Bamboo Wood + Stainless Steel Color: Brown, Light Brown (random) Size: 34cmx 1.7cm X 24cm Design: Arc Corners Features: Made Of High-quality Bamboo Anti-mildew And Germ Proofing 100% Brand New And High Quality Easy To Clean And Very Affordable The Whole Bamboo Panel Has A Clear Bamboo Pattern. The Curved Design Of The Handle Makes It Easy To Hang. Thick, Extremely Durable, The Smooth Surface Also Prevents Your Knives From Dulling Too Quickly. Piece Fish Poacher, Medium 1 2,860.00 2,860.00 Stainless Steel Fish Streamer For Big Fish, Big Cooking Pot With Complete Accessories Pan Material: Stainless Steel Thickness: 0.7mm (+0.3mm) Dimensions (l X W X D): 18" X 5" X 6" (±0.5") Handle Material: Stainless Steel; With Two Side Handles Includes A Lid With Handle And A Perforated Rack Insert Dishwasher Safe Pieces Casserole, Small 4 313.50 1,254.00 Aluminum Casserole High Quality Aluminum Durable Handles & Knobs Size #14 (25cm Diameter, 15cm Height) Color: Aluminum Size: 35cm*28cm*20cm Weight: 0.7kg Pieces Casserole, Medium 3 1,980.00 5,940.00 Heavy Gauge Aluminum Forged Base For Extreme Strength And Wrap Prevention Durable 3 Layer Blue Diamond Non-stick Coating Coating Lasts Longer Than Any Other Pan Works On All Stovetops: Induction, Gas, Electric, Ceramic, Etc. Heat Resistant Riveted Bakelite Handle And Knob Tempered Glass Lid Heats Up Quickly And Evenly Ideal For Healthy Cooking Easy-to-clean And Dishwasher Safe Pieces Wok, Small 4 1,100.00 4,400.00 Material: Wok Is Made With Carbon Steel With Wooden Handle Available Size: 34cm Diameter Double Handle Suitable For Gas Stove And Induction Cooker Good Thermal Conductance For Even Cooking Of Vegetables And Meat Piece Wok, Medium 1 9,460.00 9,460.00 Features And Usage: Whether Stir-frying Veggies Eggs Meats Or More This Wok Distributes Heat Evenly And Wipes Clean When You’re Finished Riveted Acacia Wood Handles Make Flipping And Releasing Food Easy And Will Add A Touch Of Elegance To Your Kitchen Perfect For Veteran Chefs Or Others Simply Looking To Expand Their Culinary Palette This Wok Serves Up Delicious Results With Effortless Performance Color: Black Size: 14” Material: Carbon Steel Wok Non-stick Surface Healthier Cooking Piece Double Boiler, Medium 1 1,977.80 1,977.80 Specialty Pan Type: Egg Poacher/boiler Cookware Material: Stainless Steel Cookware Capacity: 1.1l - 2l Cookware Diameter (cm): 22 Model: Db22. Cookware Features: Includes Lid, Dishwasher Safe, Induction Safe, Helper Handle, Pfoa Free, Eco Friendly, Cover Included What’s In The Box: 1 X Double Boiler 22cm Pieces Paellera 5 1,760.00 8,800.00 Product Details: Made With Top Grade Carbon Steel, These Pans Conduct Heat Quickly And Evenly Throughout To Create The Perfect Paella. It’s Thin And Lightweight Material Makes This Pan Durable And Trustworthy. It’s Innovative Hammered Dimple Technology Makes The Bottoms Of The Pans Rigid And Perfect For Cooking Paellas Package Dimensions: 15.24 X 13.62 X 2.05 Inches (38.7 X 34.6 X 5.2 Cm) Item Weight: 2 Pounds (0.9 Kg) Material: Carbon Steel Item Diameter: 13 Inches (33 Cm) Color: Silver Capacity: 468 Cubic Inches (1188.7 Cm) Pieces Glass Rack 2 627.00 1,254.00 Description: Product Category: Wine Glass Rack Color: Black Height: 5.5 Cm Width: 22.5 Cm3 5 Rows: 50cm In Length, Can Hold 10-15 Weight: 0.55kg For 5 Rows Application: 4cm- 9cm In Base Diameter, Less Than 3cm In Column Diameter, 10cm In Belly Diameter Of Glass. Material: Iron Product List:1* Wine Glass Pieces Soup Cup Rack 4 3,080.00 12,320.00 Material: Plastic Color: Grey Shape: Square Length: 19.75" In Width: 19.75" In Height: 4" In Size: Compartment 4.375"l X 4.375"w X 4.25" Temperature Range: Up To 200°f Features: Dishwasher Safe Pieces Plate Rack 2 770.00 1,540.00 Specification: Color: White, Green Material: Stainless Steel Dimension: W X L X H (25cm X 50cm X 43.5cm) Features: Stainless Steel Material, No Rusting, Long Lasting Durability. Saves Tons Of Space And Time By Making It Easier To Access Utensils And Supplies, Making Your Kitchen More Clean And Tidy. Dish Placement Area (16 Dishes) Cutting Board Placement Area (5cm/1.97in) Tool Placement Area: 3 Spaced Grids Hanging Spoon Placement Area: 4 Storage Hooks Bowl Placement Area: More Than 12 Bowls Removable Drain Board Pieces Baking Tray, Small 8 165.00 1,320.00 1pc Small Rectangular Baking Tray Measurement: 8x12 8x 12 Outside, 6.5x10 Inside Color: Black Made Of Carbon Steel Durable And Good Quality This Can Be Fit To Small Oven Pieces Utility Tray, Stainless 8 1,430.00 11,440.00 Stainless Steel Food Measurement: 9" Length X 6.75" Width X 1" Height. Material: Stainless Steel. Pieces Roasting Pan 2 1,430.00 2,860.00 Material: Stainless Steel Color: Silver Size: 42*32*7cm Features: Easy To Clean Up. Big Enough For Whole Chicken Or Turkey. Very Convenient To Serve With Rack. Package Included: 1 X Pan (with A Rack) Pack Dishtowels 5 385.00 1,925.00 Material: Cotton/linen Blend With High Absorption Capacity. Color: Square Stripe/gray Beige Length: 70 Cm (28 ") Width: 50 Cm (20 ") Package Quantity: 2 Pieces Set Plastic “silverware” Or Real Silverware 1 3,410.00 3,410.00 Package Dimensions: 9.92 X 6.57 X 3.23 Inches (25.2 X 16.7 X 8.2 Cm) Item Weight: 7 Pounds (3.15 Kg) Material: Stainless Steel Finish Type: Polished Color: Silver Is Stain Resistant: Yes Is Dishwasher Safe: Yes Number Of Pieces: 60 Set Small Plate/saucers 4 484.00 1,936.00 Piece Cabinet Dish Organizer 1 1,978.90 1,978.90 Piece Sink 1 5,819.00 5,819.00 Pieces Sponge And Soap Holder For Kitchen Sink 3 297.00 891.00 Set Pots/pans 1 6,270.00 6,270.00 Set Cooking Utensils 1 3,630.00 3,630.00 Set Rotary Egg Beater 2 121.00 242.00 Piece Scraper 3 104.50 313.50 Piece Drawers 1 11,000.00 11,000.00 Piece Cupboards 1 11,000.00 11,000.00 Piece Brush 3 66.00 198.00 Piece Kitchen Scale 2 165.00 330.00 Pieces Kitchen Shears 2 330.00 660.00 Multifunction Comfortable Handle Kitchen Scissors Heavy Duty Food Shears For Chicken Meat, Vegetable Fish Heb, Poultry Stainless Steel Cooking Scissors Material:30cr13 Stainless Steel Highly Antagonistic And Very Sharp- Soft And Hard Double Plastic Handle Double-edged Blade Non-slip, Stable Removable Rivet Design Flexible Application, Easy To Clean Package Included:1 X Stainless Steel Kitchen Shears Color: Black + Silver Weight: 145g Size: 227 X 78 Mm Piece Potato Masher 2 288.59 577.17 Multifunctional Stainless Steel Potato Masher For Fruit, Vegetable Baby Food Supplement Mashed Potato Tool Selected Materials, Safe And Durable. Strong And Not Easy To Rust. Ergonomic Design, Easy To Use And Save Effort. Suitable For A Variety Of Foods. Material: 304 Stainless Steel 4mm Thickness One-piece Molding Size: 7 Cm X 7 Cm X 13.6 Cm Color: Silver Sets Graters 2 286.00 572.00 Product Name: Tabletop Drum Grater High Quality: The 3 Different Rotary Ultra-sharp Cylinders Slicer Made Of Food Grade Stainless Steel. All Pieces Are Detachable For Easy To Clean, Dishwasher Safe Universal Fit: Rotary Drum Grater Is Great For Cheese, Vegetables, Potatoes, Coleslaw, Nuts, Hash Browns, Onions And More With This Hand-powered Rotary Grater Cooking Choice: Rotary Cheese Grater Package Includes 3 Different Interchangeable Rotary Ultra-sharp Cylinders Drums For Different Cooking Choice Features: The Drum Shredder With Suction Base Ensures Solid Grip And Stability On Flat Surface; Simple Hand Crank Turns Drum Creates Perfectly Grated Ingredients Type: Graters Use: Home Kitchen Material: Metal, Stainless Steel & Abs Plastic Blades: 3 Stainless Steel Feature: Kitchen Creative Tools Function: Shred A Wide Variety Of Fruit And Vegetables, As Well As Cheeses Accessories: Chopping / Mixing Blade, Shredding Disc, Slicing Disc Color: Green Size: 26 X 11.5 X 24 Cm Weight: 674g Piece Funnels 2 280.00 560.00 Stainless Steel Piston Funnel With Holder For Cream Sauce Dosing Funnel For Sauce Style: Silver Material: Stainless Steel Size: Shelf Height Is About 17cm, Handheld Funnel Height Is 20cm Piece Can Opener 5 340.00 1,700.00 Chef’s Classic Multi Can Opener Features: Durable And Easy To Clean. Material: Designed With High-grade Stainless Steel Size: 18/8 Stainless Steel Ergonomic Stainless-steel Handles Hygienic Design Ensures Easy Cleaning Of All Surfaces Piece Cast Iron Pots And Pans 1 8,250.00 8,250.00 Pots And Pans Set Cast Iron Cookware Non-stick Wok Pan 316 Stainless Steel Household Frying Pan With Gas-fired Induction Cooker Diameter: 28cm Metal Type: Stainless Steel Wok Type: Non-coating Pans Type: Chef’s Pans Material: Stainless Steel Type: Pans Pot Cover Type: Glass Cover Capacity: 4-5l Applicable Stove: General Use For Gas And Induction Cooker Feature: Eco-friendly Pot Cover: Glass Cover Pot Cover: Glass Cover Product Categories: Wok Application Of The Stove: General-purpose Material:316 Stainless Steel Characteristics: Non-stick Pan Item:316 Xue Ping Guo The Bottom Of A Pan Material: Composite Multi-layer Base Packaging: Carton The Lid Type: The Glass Cover Product Quality Grade: Accepts Style: European Piece Double Broiler Steamer 1 2,475.00 2,475.00 2 Layer Stainless Steel Steamer Pot Large Capacity Soup Pot With Double Boilers Stockpot Cookware Cooking Tools Feature: Eco-friendly Model Number: Stainless Steel Thicken 2 Layer Steamer Pot Layers: Double Type: Double Boilers Sheet Size: 28cm Material: Stainless Steel Specification: Name: Steamer Pot Material: Stainless Steel Size: Thickened Double Steamer Pot-28cm/11.02inch Packing List: Steamer Pot*1 Piece Food Thermometer 1 3,540.00 3,540.00 Weight: 80 G Dimensions: 218 X 34 X 20 Mm Operating Temperature: -20 To +50 °c Product-/housing Material: Abs Protection Class: Ip67 With Topsafe Product Colour: White Length Probe Shaft: 55 Mm Length Probe Shaft Tip: 17 Mm Diameter Probe Shaft: 3 Mm Diameter Probe Shaft Tip: 2.3 Mm Standards: En 13485 Battery Type: 3v Button Cell (cr 2032) Battery Life: 350 H Display Type: Lcd (liquid Crystal Display) Display Size: One-line Display Lighting: No Storage Temperature: -40 To +70 °c Temperature – Ntc Measuring Range: -50 To +275 °c Accuracy: ±1 % Of Mv (+100 To +275 °c) ±0.5 °c (-30 To +99.9 °c) ±1.0 °c (-50 To -30.1 °c) Resolution: 0.1 °c Reaction Time: T₉₉ = 10 S (measured In Moving Liquid) Measuring Rate: 0.5 S Piece Kitchen Knife Set 2 220.00 440.00 8 Pieces Kitchen Knife Set Chef Knives Fruit Stainless Steel Knife Sharpener Rod Peller Scissors Pairing Tools Specifications: Item Name: Kitchen Knife Set Main Material: 3cr13 Stainless Steel Quantity: 8pcs Note: Please Kindly Note That There Could Be A Few Deviations As The Result Of Manual Measurement. Thank You Package Information: Package Size: 31 * 28 * 2.5cm / 12.3 * 11.2 * 0.98in Package Weight: 700g Package List: 2 * Chef Knife 1 * Chopping Knife 1 * Knife Sharpener 2 * Fruit Knife 1 * Scissors 1 * Peeler Piece Meat Slicer 1 2,090.00 2,090.00 Description: Meat Slicer Material: The Frozen Meat Slicer Is Made Of High-quality Stainless Steel, Which Is Easy To Clean And Has A Long Service Life. It Helps To Cut Frozen Meat Into Various Uses, Including Making Hot Pot, Sukiyaki, Pizza Toppings, Sandwiches Or Ginger. It Can Effectively Avoid The Vibration And Noise Of The Electric Tool During The Working Process, It Is Simple To Operate And Easy To Clean. The Thickness Of The Meat Can Be Adjusted From 0.3mm To 8mm, Just Turn The Knob Slightly. Handle And Suction Cup: Even If There Is Oil On The Hand, It Will Not Slide. The Rubber Suction Cup At The Bottom Is More Suitable For Flat Desktops, And Ceramic Tiles, Glass And Metal Desktops Are Easier To Hold. Specification: Handle Length: 43.5/17.10inch Size (l X W): About 33x17cm / 12.96x6.69inch Blade Length: About 20cm Material: Stainless Steel Package Includes: 1x Vegetable Cutting Machine Piece Cookie Press 1 561.00 561.00 Decorative Tool Use, Press The Front End Of The Handle Button, Use The Above Operating Rod, The Extrusion Is Under Your Control. Features: 100% High Quality Type: Cookie Machine Material: Aluminum Alloy, Abs Plastic Size: Diameter:5.5cm,height:21cm Included: 1 X Cookie Machine 20 X Design Discs 4 X Icing Tips Set Cake Decorating 2 110.00 220.00 Color: Pink / Blue / White / Green Material: Silicone & Stainless Steel Cake Nozzle Size: Approx.1.8cm X 3.3cm Pastry Bag Size (length):approx.32cm X 17.5cm Material: Lfgb Food Grade Eva Material Purpose: Diy Necessary Utensils For Cake Cream Package Included: 24 X Cake Nozzles 1 X Pastry Bag 1 X Plastic Piping Converter Pieces Serving Tray 5 1,100.00 5,500.00 Rectangular Serving Tray/ Multi-purpose Utility Tray Non-skid Feature: Non-slip Material Heat Resistance Space Saving Wide Application Fine Workmanship Piece Steel Multipurpose Basket 1 3,689.00 3,689.00 Piece Weighing Scale 3 715.00 2,145.00 Manual Weighing Scale; 10kg.,stainless Small Bowl, Heavy Duty Set Measuring Cups Set 7 1,128.91 7,902.40 7 Pieces With A Convenient 1/8 Coffee Scoop; Complete Set Of 7with Pouring Lip, Sizes Include 1/8, 1/4, 1/3, 1/2, 2/3, 3/4 And 1 Cup, Food Grade Material Of Stainless Steel, Dishwasher Safe, Set Measuring Spoons 14 164.92 2,308.90 Sizes: 1/8tsp (0.63ml),1/4tsp (1.25ml),1/2tsp (2.5ml), 1 Tsp(5ml), 1/2tbsp (7.5ml),1 Tbsp (15ml), High Quality Stainless Steel, Dishwasher Safe Piece Measuring Urn 7 352.00 2,464.00 Glass,capacity: 100 Ml. (with 10 Ml Increments),metric And English System Of Measurement; With Handle And Spout, Clear, Non-porous, Tempered Glass Piece Mixing Bowl 11 251.90 2,770.90 Capacity:2.5l,high Quality,durable, Stain And Rust Resistant, Stainless Steel,diameter 22cm Piece Baking Sheet 25 211.50 5,287.43 13'x18', Tray Size 46x34cm, Aluminum Piece Wire Whisk 9 207.90 1,871.10 12inch, Heavy Duty, Stainless Steel, French Wire Piece Muffin Pan 60 57.68 3,461.04 12 Cups Muffin Bun Cupcake Bakewear Mold Material:carbon Steel With Non-stick Coating, Size:l:35cm X W:26cm X H:3.0cm Large Inner 7.0cm Piece Rubber Scraper 5 38.50 192.50 Big Size Silicone Rubber Spatula/scraper, Material:plastic+silicone Rubber, Size 24cm X 5cm Piece Hand Mixer 1 2,608.60 2,608.60 5-speed Selection,175w Power Consumption, 1.7m Power Cord, Weight: 1.08g., Dimensions:9.3cm X 19.5cm X 15.1cm, 220-240v Piece Revolving Cake Stand 3 600.00 1,800.00 Total: 2,631,530.02 2. Deped-division Of Sultan Kudarat, Through Its Bids And Awards Committee (bac), Now Invites Bids For The Above-mentioned Procurement Project. Prospective Bidders Must Have An Experience Of Having Completed At Least One (1) Contract That Is Similar To The Contract To Be Bid. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii, Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non- Discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. 4. Bidding Is Restricted To Filipino Citizens/sole Proprietorships/partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interests Or Outstanding Capital Stocks Belonging To Citizens Of The Philippines. 5. A Complete Set Of Bidding Documents May Be Acquired Or Purchased At Deped-division Of Sultan Kudarat Bac Secretariat, Located At National Hi-way Brgy, Kenram, Isulan, Sultan Kudarat Upon Accomplishing A Bidder’s Information Sheet And Payment In Cash Of A Non-refundable Fee By Interested Bidders In The Amount Of Five Thousand Pesos (php5,000.00) Per Lot To The Division Cashier. Only Bidders Who Purchased The Bidding Documents Will Be Allowed To Submit Bids (itb 6.8). It May Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), Www.philgeps.net, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Deped- Division Of Sultan Kudarat Will Be Having The Following Procurement-related Activities. Activity Date & Time Venue Issuance Of Bidding Documents November 13–december 03, 2024 Division Office, National High-way,brgy Kenram, Isulan, Sul. Kudarat Pre-bid Conference November 21, 2024 (10:00 Am) Division Kalimudan Hall, Brgy. Kenram, Isulan Sultan Kudarat Submission And Opening Of Bids December 03, 2024 (10:00 Am) Division Kalimudan Hall, Brgy. Kenram, Isulan Sultan Kudarat 7. Prospective Bidders Are Strongly Encouraged To Order Or Download The Electronic Copy Of The Bidding Documents From The Philgeps Website: Www.philgeps.net, For Them To Be Included In The Document Request List Of The Project. 8. Bids Must Be Delivered To The Address And On The Date And Time Stated Herein. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. A Valid Bid Securing Declaration Must Accompany The Bid(s) In Lieu Of The Bid Security. 9. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Opening Of Bids At The Address Stated Herein. Late Bids Shall Not Be Accepted. 10. Deped Division Of Sultan Kudarat Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Not Award The Contract(s), Or Annul The Bidding Process Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Melvin P. Fortuna Chairperson, Bac Secretariat Department Of Education Region Xii Division Of Sultan Kudarat Kenram,isulan, Sultan Kudarat Tel/fax # 064-471-1007 Meilrose B. Peralta, Edd Assistant Schools Division Superintendent Bac Chairperson
Closing Date3 Dec 2024
Tender AmountPHP 2.6 Million (USD 44.6 K)

Caraga Regional Hospital Tender

Healthcare and Medicine
Philippines
Details: Description Republic Of The Philippines Department Of Health Caraga Regional Hospital Surigao City Bids And Awards Committee Ooooooo ----------------------------------------------------------------------------------------------------------------------------- @@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@ Invitation To Bid Ib No. 2024-11-28 (91) Supply And Delivery Of Various Medical Grade Equipment And Instrument Back Table For Ambulatory Use – Rebid Abc: ₱ 1,300,000.00 ===================================================================== 1. The Caraga Regional Hospital (crh), Through The General Appropriation Act (gaa), Hfep - Saa No. 2024-02-0271 Intends To Apply The Sum Of Being The Approved Budget For The Contract (abc) Of One Million Three Hundred Thousand Pesos Only (php 1,300,000.00) Under The Contract For The Supply And Delivery Of Various Medical Grade Equipment And Instrument Back Table For Ambulatory Use – Rebid. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening And Items Below Are Subject For A Competitive Bidding, To Wit: Item No. Description Qty Unit Of Measure Unit Cost Total Cost 1 Vacuum Cleaner, Heavy Duty With Hepa Filter Bags 2 Set ₱150,000.00 ₱ 300,000.00 2 Surgical Emergency Medecine Crash Cart W/ Power Outlet Extension Wire And Cardiac Board 1 Set ₱100,000.00 ₱ 100,000.00 3 Patient Normothermia Warming Blanket Device 4 Unit ₱50,000.00 ₱ 200,000.00 4 Core Needle Biopsy Gun, Reusable With Autoclavable Needle Set 2 Unit ₱100,000.00 ₱ 200,000.00 5 Cast Cutter, Orthopedic, Electric, Medical Grade 2 Set ₱200,000.00 ₱ 400,000.00 6 Instrument Back Table With Pedal Operated Wheels And Hydraulic Height Adjustment 2 Unit 50,000.00 100,000.00 Grand Total ₱ 1,300,000.00 This Is A Partial Bid Or Line Item Bid 1 Vacuum Cleaner, Heavy Duty With Hepa Filter Bags Description A Vacuum Cleaner With A Hepa Filtration System For More Effective Indoor Cleaning And Disinfection. This Machine Can Minimize Indoor Air Pollution And Mitigate Exposure To Allergic Triggers. Purpose Of Use Ambulatory Surgery Unit Technical Specification Dust Capacity: 2.5l Hose Length: Not More Than 1.5m Washable And Filters Preferably Autoclavable Quick Dust Release One Touch Automatic Cord Rewind Extension Cord Of 5 Meters To 10 Meters Long Power Cord To Avoid Changing Power Points Every 5 Meters. Power: 1000w Suction Power: 130w Voltage: 100vac-240vac 60hz Waterproof Motor Additional Reusable Filter Bags Preferably Autoclavable Physical / Chemical Characteristics Consider A Vacuum Cleaner That Is: Light Weight Quiet Operation Easy To Use Over Floors, Walls, Ceiling And Hard Surfaces And Has A Compact Design For Easy Storage And Maneuverability Environmental Factors Capable Of Being Stored Continuously In Ambient Temperature Of 0 To 50 Deg Celsius And Relative Humidity Of 15 To 90%. Capable Of Operating Continuously In Ambient Temperature Of 10 To 40 Deg Celsius And Relative Humidity Of 15 To 90% Accessories, Consumables, Spare Parts, Other Components · Brush Tool · Hose Not More Than 1.5m · Filter (preferably Autoclavable) · Hose Connector · Compressed Brush · Extending Plastic Tube At Least 5 Pieces Extra Hepa Filters (autoclavable) Technical Services System Warranty Must Be Five (5) Years Service Call Within 24 Hours Maximum. Preventive Maintenance For Every Quarter Until Warranty Expires. Service Kits And Consumables To Be Included For One Year Use. Supplier Must Deliver And Install The Unit Without Cost To The Owner Training Of End-users And Biomed Engineer Must Be Done On-site With Minimum Of 1 Day Period. Training / Installation / Utilization Pre- Installation Supplier To Perform Installation, Safety And Operation Checks Before Handover. Requirement For Commissioning Local Clinical Staff To Affirm Completion Of Installation, Calibration Certificate And Warranty Certificate Training Of Users Training Of Users And Biomed Engineer & Staff In Operation And Basic Maintenance Shall Be Provided User Care To Demonstrate The Proper Cleaning And Disinfection With Provision Of Printed Cards Or Tags Beside The Unit. Safety And Standards En 1041: Information Supplied By The Manufacturer With Medical Devices En 60601-1: Medical Electrical Equipment Part 1: General Requirements For Safety (iec: 60601-1:1998) En 60601-1-2: Medical Electrical Equipment Part 1-2: General Requirements For Safety - Collateral Standard: Electromagnetic Compatibility - Requirements And Test (iec 60601-1-2:2001) Warranty And Maintenance 5 Years Warranty Documentation Requirements User, Technical And Maintenance Manuals To Be Supplied In English Language. Service Manual In English. List To Be Provided Of Important Spares And Accessories, With Their Part Serial Numbers And Cost. Certificate Of Calibration, Warranty And Inspection To Be Provided. Delivery Period 45 Calendar Days From Receipt Of The Notice To Proceed Mode Of Payment Upon Full Delivery, Installed, Tested And Commissioned Post-qualification Must Be Willing To Send Demo Unit To Caraga Regional Hospital. Supplier To Provide Actual Prototype/demo-unit During The Conduct Of Post Qualification- Same Brand & Model Of Offered Bid, No Alteration Of Actual Submitted Brochure Technical Specification Sheets. Failure To Comply With The Preferred Schedule Of The Procuring Entity For The Post Qualification Can Be A Ground For Disqualification. (no Extensions Allowed.) Service Center Must Have Service Center Within Caraga Region, Cebu City, Cdo Or Davao City. Other Terms And Condition Of Acceptability: Supplier Must Comply With The Following Conditions: 1. Must Be The Authorized Distributor Of The Principal Company Of The Equipment And The Necessary Consumables In The Philippines 2. Submit Certificate Of Training Of The Company Engineer /technical Personnel And Product Specialist Issued By The Principal Or Manufacturer 3. Provide Company Response Within 24-48hrs In Case Technical Problems Or Equipment Breakdown 4. Must Submit Notarized Certificate Of Availability Of Spare Parts For The Next 5years 5. Supplier Must Have An Actual Installation Of The Offered Brand And Model 6. Provision On-site Training For End-user & Maintenance Personnel On Basic Preventive Maintenance And Proper Operation Of The Unit. 2 Surgical Emergency Medicine Crash Cart W/ Power Outlet Extension Wire And Cardiac Board Description Surgical Emergency Medicine Crash Cart Is Used To Transport And Dispense Emergency Medications And Supplies. It Is Essential For Cardiopulmonary Resuscitation As It Contains Advanced Cardiac Life Support (acls) First-line Drugs, A Defibrillator, A Bag Valve Mask, A Suction Device And Emergency Supplies. Purpose Of Use Ambulatory Surgery Unit Technical Specification Portable Stainless Steel Trolley Body Stainless Columns Rust Proof Iv Poles (2 Pcs) Dust Basket Utility Container Waterproof File Bag At The Side Defibrillator And Cardiac Monitor Shelf Power Outlet, Extension Wire & Hook Sliding Side Shelf Stainless Steel Guard Rail Stainless Steel Waste Bins Centralized Lock Two (2) Small And Four (4) Big Drawers Total Of 6 Level Division Drawers Adjustable Partitions For Organization At The Inner Portion Of Each Drawer Drawers Can Be Repositioned Easily 4pcs 125mm Casters, Two With Brake And Lock System Cpr Or Cardiac Board Oxygen Tank Holder Catheter Holders Sharps Containers Physical / Chemical Characteristics Surgical Emergency Medicine Crash Cart Is Made Of High-strength Stainless Material, Making It Sturdy And Durable. The One-piece Stainless Top Board Has An Arching Handle And Raised-edge Design, Covered With Rust Proof Stainless Steel. It Comes With Four Rust Proof Stainless Steel Columns For Added Stability. Ideal For Emergency Situations During A Surgical Operation As It Is Easy To Maneuver And Can Transport A Variety Of Medical Supplies And Medications. Environmental Factors - Capable Of Being Stored Continuously In Ambient Temperature Of 0 To 50 Deg Celsius And Relative Humidity Of 15 To 100%. Accessories, Consumables, Spare Parts, Other Components Emergency Crash Cart Accessory Package: 2 Pcs Stainless Steel Iv-pole With 4 Durable Hangers, Cardiac Board, Side Shelf, Heavy Duty Railings, Oxygen Tank Brackets, 3 Inches X 4 Inches Tray W/ Dividers, 5 Inches X 2 Inches Tray W/ Dividers, Waterproof Label Holders And Utility Hooks, And Emergency Led Flashlight Technical Services System Warranty Must Be Five (5) Years Service Call Within 24 Hours Maximum. Preventive Maintenance For Every Quarter Until Warranty Expires. Service Kits And Consumables To Be Included For One Year Use. Supplier Must Deliver And Install The Unit Without Cost To The Owner Training Of End-users And Biomed Engineer Must Be Done On-site With Minimum Of 1 Day Period. Training / Installation / Utilization Pre- Installation Supplier To Perform Installation, Safety And Operation Checks Before Handover. Requirement For Commissioning Local Clinical Staff To Affirm Completion Of Installation, Calibration Certificate And Warranty Certificate Training Of Users Training Of Users And Biomed Engineer & Staff In Operation And Basic Maintenance Shall Be Provided User Care To Demonstrate The Proper Cleaning And Disinfection With Provision Of Printed Cards Or Tags Beside The Unit. Safety And Standards Iso 13485, Fda, Ce. Iso 14971:2007 Medical Devices -- Application Of Risk Management To Medical Devices Iec 60601-1:2012 Medical Electrical Equipment - Part 1: General Requirements For Basic Safety And Essential Performance Warranty And Maintenance 5 Years Warranty Documentation Requirements User, Technical And Maintenance Manuals To Be Supplied In English Language. Service Manual In English. List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. Certificate Of Calibration, Warranty And Inspection To Be Provided. Delivery Period 45 Calendar Days From Receipt Of The Notice To Proceed Mode Of Payment Upon Full Delivery, Installed, Tested And Commissioned Post-qualification Must Be Willing To Send Demo Unit To Caraga Regional Hospital. Supplier To Provide Actual Prototype/demo-unit During The Conduct Of Post Qualification- Same Brand & Model Of Offered Bid, No Alteration Of Actual Submitted Brochure Technical Specification Sheets. Failure To Comply With The Preferred Schedule Of The Procuring Entity For The Post Qualification Can Be A Ground For Disqualification. (no Extensions Allowed.) Service Center Must Have Service Center Within Caraga Region, Cebu City, Cdo Or Davao City. Other Terms And Condition Of Acceptability: Supplier Must Comply With The Following Conditions: 1. Must Be The Authorized Distributor Of The Principal Company Of The Equipment And The Necessary Consumables In The Philippines 2. Submit Certificate Of Training Of The Company Engineer /technical Personnel And Product Specialist Issued By The Principal Or Manufacturer 3. Provide Company Response Within 24-48hrs In Case Technical Problems Or Equipment Breakdown 4. Must Submit Notarized Certificate Of Availability Of Spare Parts For The Next 5years 5. Supplier Must Have An Actual Installation Of The Offered Brand And Model 6. Provision On-site Training For End-user & Maintenance Personnel On Basic Preventive Maintenance And Proper Operation Of The Unit. 3 Patient Normothermia Warming Blanket Device Description A Device That Helps Control The Patient’s Temperature. Has Two Separate Heating And Cooling Reservoirs To Help Deliver Either A Heated Solution Or Cooled Solution To The Patient When Needed. The Desired Temperature Water Is Circulated Through Tubing In A Blanket. The System Is Continuously Checking The Temperature Of The Water Against The Temperature Of The Patient To Achieve The Desired Correct Temperature. A Manual Mode And An Automatic Mode With A Microprocessor That Creates A More Precise And Accurate Reading. Actively Warming Patients That Have Hypothermic Symptoms. Dual Reservoir For Warming And Cooling System. Maintaining Normothermia Throughout The Perioperative And Postoperative Periods Help Safeguard Patients From The Potential Of Dangerous Complications. The Normothermia Blanket System Provides A Comprehensive Solution That Works Seamlessly Throughout The Perioperative Process To Effectively And Efficiently Measure And Manage Patient Temperature. Clinical Research About Patient Warming Shows That Consistently Maintaining A Patient’s Core Body Temperature Before, During And After Surgery With The Temperature Management System Helps Reduce The Risk Of Surgical Site Infections By Maintaining Normothermia. Purpose Of Use Ambulatory Surgery Unit Technical Specification Temperature Control: Blanket Range: 39.2 To 107.6 °f (4 To 42°c) Patient Range: 86 To 105.8 °f (30 To 41°c) Heating Rate: 3.2 °f/ Min ( 1.8°c/min) Cooling Rate: 3.4 °f/min (1.9°c/min) Control: Microprocessor Self-compensating Temperature Measurement No Periodic Calibration Required Fluid System Distilled Water: 2.5 Gallons Separated Hot And Cold Reservoirs Magnetically Coupled Pump 16gph Flow Rate Minimum Within The Blanket Refrigerant: R-134a (freon Free) Power: Volts: 100vac-240vac 60hz 500 Watts Heater 1/3 Hp Refrigeration System Physical / Chemical Characteristics The Blanket Is X-ray Compatible. It Is Also Latex Free To Reduce Allergy Risks And Is Recyclable And Can Be Easily Wiped Down With Approved Disinfectants. Patient Warming Blankets Are An Ideal Choice For A Variety Of Normothermic Procedures, As They Are Lightweight, Convenient To Carry And Easily Transportable. The Blanket Can Still Maintain Performance After Cuts Or Spills, And Its Small-profile Cable Can Be Secured Easily With Its Integrated Linen Clip To Reduce Tripping Hazard Risk. Environmental Factors - Capable Of Being Stored Continuously In Ambient Temperature Of 0 To 50 Deg Celsius And Relative Humidity Of 15 To 100%. Accessories, Consumables, Spare Parts, Other Components 1 Safety Storage Box Flexible, Versatile Flexible Blanket Overlays, Covered On Both Sides In A Soft, Lightweight Material That’s Comfortable Against A Patient’s Skin. Tamper-proof Or Tear-proof Material. Integrated Rechargeable Battery With Two Hours Of Continuous Use To Allow Warming To Continue Uninterrupted During Transport And Power Shortage. The Soft-touch Controller Unit And Universally Pole-mountable, Features Adjustable Temperature Settings And A Large Temperature Display, And Can Independently Manage Two Blankets Simultaneously To Maximize Skin Coverage. Self-sealing Connecting Hoses Linen Clip Or Securing Clips Refrigerant: R-134a (freon Free) Technical Services System Warranty Must Be Five (5) Years Service Call Within 24 Hours Maximum. Preventive Maintenance For Every Quarter Until Warranty Expires. Service Kits And Consumables To Be Included For One Year Use. Supplier Must Deliver And Install The Unit Without Cost To The Owner Training Of End-users And Biomed Engineer Must Be Done On-site With Minimum Of 1 Day Period. Training / Installation / Utilization Pre- Installation Supplier To Perform Installation, Safety And Operation Checks Before Handover. Requirement For Commissioning Local Clinical Staff To Affirm Completion Of Installation, Calibration Certificate And Warranty Certificate Training Of Users Training Of Users And Biomed Engineer & Staff In Operation And Basic Maintenance Shall Be Provided User Care To Demonstrate The Proper Cleaning And Disinfection With Provision Of Printed Cards Or Tags Beside The Unit. Safety And Standards Iec 60601-1:2012 Medical Electrical Equipment - Part 1: General Requirements For Basic Safety And Essential Performance Iec 60601-1-1:2000 Medical Electrical Equipment - Part 1-1: General Requirements For Safety - Collateral Standard: Safety Requirements For Medical Electrical Systems En 12470-5: European Standard For Clinical Thermometer Performance, En 1041: Information Supplied By The Manufacturer With Medical Devices Warranty And Maintenance 5 Years Warranty Documentation Requirements User, Technical And Maintenance Manuals To Be Supplied In English Language. Service Manual In English. List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. Certificate Of Calibration, Warranty And Inspection To Be Provided. Delivery Period 45 Calendar Days From Receipt Of The Notice To Proceed Mode Of Payment Upon Full Delivery, Installed, Tested And Commissioned Post-qualification Must Be Willing To Send Demo Unit To Caraga Regional Hospital. Supplier To Provide Actual Prototype/demo-unit During The Conduct Of Post Qualification- Same Brand & Model Of Offered Bid, No Alteration Of Actual Submitted Brochure Technical Specification Sheets. Failure To Comply With The Preferred Schedule Of The Procuring Entity For The Post Qualification Can Be A Ground For Disqualification. (no Extensions Allowed.) Service Center Must Have Service Center Within Caraga Region, Cebu City, Cdo Or Davao City. Other Terms And Condition Of Acceptability: Supplier Must Comply With The Following Conditions: 1. Must Be The Authorized Distributor Of The Principal Company Of The Equipment And The Necessary Consumables In The Philippines 2. Submit Certificate Of Training Of The Company Engineer /technical Personnel And Product Specialist Issued By The Principal Or Manufacturer 3. Provide Company Response Within 24-48hrs In Case Technical Problems Or Equipment Breakdown 4. Must Submit Notarized Certificate Of Availability Of Spare Parts For The Next 5years 5. Supplier Must Have An Actual Installation Of The Offered Brand And Model 6. Provision On-site Training For End-user & Maintenance Personnel On Basic Preventive Maintenance And Proper Operation Of The Unit. 4 Core Needle Biopsy Gun, Reusable With Autoclavable Needle Set Description A Set Of Hand-held Reusable Biopsy Device Used To Obtain Adequate Tissue Samples From Patients With Tumors, Masses Or Areas Of Concern. It Can Be Used To Do Biopsy In Various Organs And Masses In The Breast, Extremities, Liver, Kidney, Prostate, Among Others. These Tissue Samples Are Then Sent For Pathological Examination. It Is Intended For Multiple Use, And Fires Both A Central Stylet And Cutting Sheath In A Rapid Forward Motion Such That The Tissue Core Is Obtained At A Preset Distance Ahead Of The Visualized Needle Tip. Purpose Of Use Ambulatory Surgery Unit Technical Specification ● Reusable Core Needle Biopsy Gun ● Dual Spring System - For High Speed And Consistent Sampling ● Lightweight And Made Of Aluminum ● One-hand Activation For Single Person Operation And Easy Access To Tissue Sample ● Compatible With Needles In Various Lengths And Sizes. ● Dual Penetration Depths (15mm To 22mm) For Flexibility And Accuracy ● Etched Needle Tips For Better Visualization Of Needle Placement Under Ultrasound Guidance ● Color-coded Hubs For Easier Identification Of Size Of Needles Measurement Length: 12-15cm X 20-25cm Weight: <250g Physical / Chemical Characteristics Components: Instrument To Be Placed In A Sturdy Case That Is Portable And Well-cushioned To Avoid Damage During Transport. Mobility And Portability: Portable, Mobile And Easy To Carry Case Containing The Instrument. Environmental Factors Capable Of Being Stored Continuously In Ambient Temperature Of 0 To 50°celsius And Relative Humidity Of 15 To 90%. Capable Of Operating Continuously In Ambient Temperature Of 10 To 40°celsius And Relative Humidity Of 15 To 90%. Accessories, Consumables, Spare Parts, Other Components ● Case For The Device For Storage ● Biopsy Autoclavable Needles Compatible To The Instrument: ○ 10 Pcs - Gauge 18, Length 10cm ○ 10pcs - Gauge 18, Length 20cm ○ 20 Pcs - Gauge 14, Length 10cm Technical Services System Warranty Must Be Five (5) Years Service Call Within 24 Hours Maximum. Preventive Maintenance For Every Quarter Until Warranty Expires. Service Kits And Consumables To Be Included For One Year Use. Supplier Must Deliver And Install The Unit Without Cost To The Owner Training Of End-users And Biomed Engineer Must Be Done On-site With Minimum Of 1 Day Period. Training / Installation / Utilization Pre- Installation Supplier To Perform Installation, Safety And Operation Checks Before Handover. Requirement For Commissioning Local Clinical Staff To Affirm Completion Of Installation, Calibration Certificate And Warranty Certificate Training Of Users Training Of Users And Biomed Engineer & Staff In Operation And Basic Maintenance Shall Be Provided User Care To Demonstrate The Proper Cleaning And Disinfection With Provision Of Printed Cards Or Tags Beside The Unit. Safety And Standards Certified In At Least One Of The Following: Iso 13485:2003 Medical Devices -- Quality Management Systems -- Requirements For Regulatory Purposes (australia, Canada And Eu) Iso 14971:2007 Medical Devices -- Application Of Risk Management To Medical Devices Iec 60601-1:2012 Medical Electrical Equipment - Part 1: General Requirements For Basic Safety And Essential Performance Iec 60601-1-1:2000 Medical Electrical Equipment - Part 1-1: General Requirements For Safety - Collateral Standard: Safety Requirements For Medical Electrical Systems Iec 60601-1-2:2007 Medical Electrical Equipment - Part 1-2: General Requirements For Basic Safety And Essential Performance - Collateral Standard: Electromagnetic Compatibility - Requirements And Tests Iec 60601-2-37:2007 Medical Electrical Equipment - Part 2-37: Particular Requirements For The Basic Safety And Essential Performance Of Ultrasonic Medical Diagnostic And Monitoring Equipment Iec 61391-1:2006 Ultrasonics - Pulse-echo Scanners - Part 1: Techniques For Calibrating Spatial Measurement Systems And Measurement Of System Point-spread Function Response Iec 61391-2:2010 Ultrasonics - Pulse-echo Scanners - Part 2: Measurement Of Maximum Depth Of Penetration And Local Dynamic Range Iec 62359 :2010 Ultrasonics - Field Characterization - Test Methods For The Determination Of Thermal And Mechanical Indices Related To Medical Diagnostic Ultrasonic Fields Warranty And Maintenance 5 Years Warranty Documentation Requirements User, Technical And Maintenance Manuals To Be Supplied In English Language. Service Manual In English. List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. Certificate Of Calibration, Warranty And Inspection To Be Provided. Delivery Period 45calendar Days From Receipt Of The Notice To Proceed Mode Of Payment Upon Full Delivery, Installed, Tested And Commissioned Post-qualification Must Be Willing To Send Demo Unit To Caraga Regional Hospital. Supplier To Provide Actual Prototype/demo-unit During The Conduct Of Post Qualification- Same Brand & Model Of Offered Bid, No Alteration Of Actual Submitted Brochure Technical Specification Sheets. Failure To Comply With The Preferred Schedule Of The Procuring Entity For The Post Qualification Can Be A Ground For Disqualification. (no Extensions Allowed.) Service Center Must Have Service Center Within Caraga Region, Cebu City, Cdo Or Davao City. Other Terms And Condition Of Acceptability: Supplier Must Comply With The Following Conditions: 1. Must Be The Authorized Distributor Of The Principal Company Of The Equipment And The Necessary Consumables In The Philippines 2. Submit Certificate Of Training Of The Company Engineer /technical Personnel And Product Specialist Issued By The Principal Or Manufacturer 3. Provide Company Response Within 24-48hrs In Case Technical Problems Or Equipment Breakdown 4. Must Submit Notarized Certificate Of Availability Of Spare Parts For The Next 5years 5. Supplier Must Have An Actual Installation Of The Offered Brand And Model 6. Provision On-site Training For End-user & Maintenance Personnel On Basic Preventive Maintenance And Proper Operation Of The Unit. 5 Cast Cutter, Orthopedic, Electric, Medical Grade Description Orthopedic Electric Cast Cutter Is A Medical Grade Cutter Designed For Light Weight, Low Noise, And Low Vibration System. It's Ergonomic Design Allows For Extended Use Offering Reduction In Heat And Hand Fatigue. It Offers Increased Maneuverability Due To Their Decreased Grip Size And Lack Of Obtrusive Cabling. The Facility Requires An Integrated Vacuum System With Reference Standard In Medical Grade Cast Removal Systems. Purpose Of Use Ambulatory Surgery Unit Technical Features · Mechanical Elements Mounted On Rubber Bushings Help Minimize Noise And Vibration · Scaled Components Reduce Handset Weight · No Tools Required Enabling Quick Blade And Accessory Changes · 100 Vac Low Voltage At The Handset · With Integrated Vacuum System And Additional Cutter Blades For Replacements Placed In A Sturdy Case Or Box Technical Vacuum Specification · Vacuum Power: Adjustable From 300-1000 Watts · Vacuum Noise Level: 60-70 Db · Suction: 5.21 In Hg; 84 Cfm · Vacuum Hose Length: Not Less Than 10 Inches · Vacuum Tank Capacity: 5 Gallons · Vacuum/acc. Weight: Not More Than 40 Lbs. · Handset Weight: Not More Than 1.70 Lbs. Technical Saw Specification Standard Speed Supply Frequency: 50-60hz, 120w Power Supply Input 220v / 230v,ac Only Physical / Chemical Characteristics Secured Against Fluid Ingress Machine Cover Should Be Openable For Repair And Maintenance Oil-free Pump Operation Preferred Environmental Factors - Capable Of Being Stored Continuously In Ambient Temperature Of 0 To 50 Deg Celsius And Relative Humidity Of 15 To 100%. - Capable Of Operating Continuously In Ambient Temperature Of 10 To 40 Deg Celsius And Relative Humidity Of 15 To 100%. Accessories, Consumables, Spare Parts, Other Components 12 Pcs 50mm Dia. Titanium Cast Saw Blade 12 Pcs 44mm Dia. Titanium Cast Saw Blade 12 Pcs 64mm Dia. Titanium Cast Saw Blade 2 Pcs Extraction Hood 12 Pcs Dust Bag Preferably Autoclavable 2 Pcs Cast Saw Wall Bracket Orthopedic Cast Cutter Blades, Compatible With Electric Orthopedic Cast Cutter, Tungsten Carbide Coated Heavy Duty Technical Services System Warranty Must Be Five (5) Years Service Call Within 24 Hours Maximum. Preventive Maintenance For Every Quarter Until Warranty Expires. Service Kits And Consumables To Be Included For One Year Use. Supplier Must Deliver And Install The Unit Without Cost To The Owner Training Of End-users And Biomed Engineer Must Be Done On-site With Minimum Of 1 Day Period. Training / Installation / Utilization Pre- Installation Supplier To Perform Installation, Safety And Operation Checks Before Handover. Requirement For Commissioning Local Clinical Staff To Affirm Completion Of Installation, Calibration Certificate And Warranty Certificate Training Of Users Training Of Users And Biomed Engineer & Staff In Operation And Basic Maintenance Shall Be Provided User Care To Demonstrate The Proper Cleaning And Disinfection With Provision Of Printed Cards Or Tags Beside The Unit. Safety And Standards Iso 13485, Fda, Ce. Iso 13485:2003 Medical Devices -- Quality Management Systems -- Requirements For Regulatory Purposes (australia, Canada And Eu) Iso 14971:2007 Medical Devices -- Application Of Risk Management To Medical Devices Iec 60601-1:2012 Medical Electrical Equipment - Part 1: General Requirements For Basic Safety And Essential Performance Iec 60601-1-1:2000 Medical Electrical Equipment - Part 1-1: General Requirements For Safety - Collateral Standard: Safety Requirements For Medical Electrical Systems Warranty And Maintenance 5 Years Warranty Documentation Requirements User, Technical And Maintenance Manuals To Be Supplied In English Language. Service Manual In English. List To Be Provided Of Important Spares And Accessories, With Their Part Numbers And Cost. Certificate Of Calibration, Warranty And Inspection To Be Provided. Delivery Period 45calendar Days From Receipt Of The Notice To Proceed Mode Of Payment Upon Full Delivery, Installed, Tested And Commissioned Post-qualification Must Be Willing To Send Demo Unit To Caraga Regional Hospital. Supplier To Provide Actual Prototype/demo-unit During The Conduct Of Post Qualification- Same Brand & Model Of Offered Bid, No Alteration Of Actual Submitted Brochure Technical Specification Sheets. Failure To Comply With The Preferred Schedule Of The Procuring Entity For The Post Qualification Can Be A Ground For Disqualification. (no Extensions Allowed.) Service Center Must Have Service Center Within Caraga Region, Cebu City, Cdo Or Davao City. Other Terms And Condition Of Acceptability: Supplier Must Comply With The Following Conditions: 1. Must Be The Authorized Distributor Of The Principal Company Of The Equipment And The Necessary Consumables In The Philippines 2. Submit Certificate Of Training Of The Company Engineer /technical Personnel And Product Specialist Issued By The Principal Or Manufacturer 3. Provide Company Response Within 24-48hrs In Case Technical Problems Or Equipment Breakdown 4. Must Submit Notarized Certificate Of Availability Of Spare Parts For The Next 5years 5. Supplier Must Have An Actual Installation Of The Offered Brand And Model 6. Provision On-site Training For End-user & Maintenance Personnel On Basic Preventive Maintenance And Proper Operation Of The Unit. 6. Instrument Back Table With Pedal Operated Wheels And Hydraulic Height Adjustment Description Instrument Back Table Are Portable Instrument Stands With A Tray On Top Used To Hold Surgical Instruments And Materials During Operating Room And In-office Procedures. Instrument Back Table Provide A Convenient Location Which Can Be Sterilized And Positioned Close To Surgical Sites Without Getting In The Way. Must Have Hydraulic System Adjustable Height Via Foot Pedal And Manual Override System For Easy Maneuvering And Adjustment While Keeping Sterility On Site. Purpose Of Use Clinical Department/ward Ambulatory Surgery Unit Technical Characteristics Recommended Uses For Product: ‎indoor Wheel Type: ‎nylon Caster Wheels Item Weight: Not More Than 7.4 Pounds Number Of Wheels: 4 Pcs With 2 Inch Swivel Caster Wheels With Brake System Caster Type: ‎swivel Weight Limit: Not More Than ‎25 Pounds Frame Material: ‎stainless Steel (304-grade) Or Rust Proof Metal Alloy Special Feature: Hydraulic Adjustable Height W/ Foot Pedal, With Manual Override System Changeable Design Tray: Detachable Tray Tray Size: 650-750mm X 530-550mm X 20-30mm (lwh) Training, Installation And Utilization Pre-installation Requirements Supplier To Perform Installation, Safety And Operation Checks Before Handover. Requirements For Commissioning Local Clinical Staff To Affirm Completion Of Installation Training Of User/s Training Of Users And Biomed Staff In Operation And Basic Maintenance Shall Be Provided User Care To Demonstrate The Proper Cleaning And Disinfection. Warranty And Maintenance Warranty 5 Year Warranty Documentation Documentation Requirements • User, Technical And Maintenance Manuals To Be Supplied In English Language. (hard And Soft Copy) • Provide Warranty Certificate Upon Delivery/installation. • List To Be Provided Of Important Spares And Accessories, With Their Brand Names, Part Numbers, Serial Numbers And Cost. Warranty Certificate And Inspection To Be Provided. Delivery Period 45 Calendar Days From Receipt Of The Notice To Proceed Terms Of Payment Upon Full Delivery, Installed, Tested And Commissioned Service Center Must Have Service Center Within Caraga Region, Cebu City, Cdo Or Davao City. Post Qualification Must Be Willing To Send Demo Unit To Caraga Regional Hospital And/or Site Visit To Nearest Hospital. Failure To Comply With The Preferred Schedule Of The Procuring Entity For The Post Qualification Can Be A Ground For Disqualification. (no Extensions Allowed.) Additional Terms Of Reference Supplier Must Comply With The Following Conditions: 1. Must Be The Authorized Distributor Of The Principal Company Of The Equipment And The Necessary Consumables In The Philippines 2. Submit Certificate Of Training Of The Company Engineer /technical Personnel And Product Specialist Issued By The Principal Or Manufacturer 3. Provide Company Response Within 24-48hrs In Case Technical Problems Or Equipment Breakdown 4. Must Submit Notarized Certificate Of Availability Of Spare Parts For The Next 5years 5. Supplier Must Have An Actual Installation Of The Offered Brand And Model 6. Provision On-site Training For End-user & Maintenance Personnel On Basic Preventive Maintenance And Proper Operation Of The Unit. Technical Specification And Other Terms Of Reference Are Hereby Posted In Philgeps And Form An Integral Part Of This Invitation To Bid. 2. The Crh Now Invites Bids For The Procurement Of The Above-captioned Project. Delivery Of The Goods Is Required Within The Period Specified Under Section Vi (schedule Of Requirements). Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. Section 23.4.1.3. (ra 9184) The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. Slcc Must Be Within 5 Years From The Submission Of Bids. (based On The Completion Date). Slcc Shall Be The Same Or Similar In Nature. Similar In Nature Means, The Bidder Shall Have An Slcc Of Any Medical Equipment. For Procurement Where The Procuring Entity Has Determined, After The Conduct Of Market Research, That Imposition Of Either (a) Or (b) Will Likely Result To Failure Of Bidding Or Monopoly That Will Defeat The Purpose Of Public Bidding: The Bidder Should Comply With The Following Requirements: A. Completed At Least Two (2) Similar Contracts, The Aggregate Amount Of Which Should Be Equivalent To At Least Fifty Percent (50%) In The Case Of Non-expendable Supplies And Services Or Twenty-five Percent (25%) In The Case Of Expendable Supplies] Of The Abc For This Project; And B. The Largest Of These Similar Contracts Must Be Equivalent To At Least Half Of The Percentage Of The Abc As Required Above. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Nondiscretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee (bac) Secretariat, At Procurement Section, Caraga Regional Hospital, Surigao City And Inspect The Bidding Documents At The Address Given Above During 8:00 Am – 5:00 Pm, Monday To Friday. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 06, 2024 – November 28, 2024 On Or Before 10:00 A.m. From The Address Above And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Specified Below: Bidding Schedule Pre-bidding Conference November 14, 2024 At 9:00 O’clock In The Morning Via Zoom Platform Link: Join Zoom Meeting Https://us06web.zoom.us/j/82360165920?pwd=ndy4dclziqayocu32blkxtgzqgw5jv.1 Meeting Id: 823 6016 5920 Passcode: 869461 Deadline Of Submission Of Bids November 28, 2024 At 10:00 A.m... Via Online And Submit Your Bidding Documents To This Email Address: Crhbac2020@gmail.com . Opening Of Bids November 28, 2024 At 2:00 P.m. Via Zoom Platform. Link: Join Zoom Meeting Https://us06web.zoom.us/j/87622574433?pwd=agknjohbmjpuh0jn6aikabgsgwbtt1.1 Meeting Id: 876 2257 4433 Passcode: 571792 Complete Philippine Bidding Documents Please Click The Link Below For The Complete Pbd: Https://drive.google.com/drive/folders/1ezfcujc3htid9l92crbxxz4ahjch-7gc?usp=sharing Payment Of Bidding Documents Php 5,000.00 It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. The Following Philippine Bidding Documents Can Be Accessed In The Philgeps, To Wit: A. Technical Specification / Terms Of Reference/ List Of Items B. Instruction To Bidders: B.1. Documents To Be Submitted (checklist- This Will Be Discussed During The Pre-bid Conference) B.2. Memorandum Of Undertaking – Provision Thereof Is Strictly Implemented C. Guidelines On The Conduct Of The Electronic Submission And Receipt Of Bids By The Procuring Entity – Caraga Regional Hospital (crh) D. Philippine Bidding Documents 6. The Crh Will Hold A Pre-bid Conference On The Above-mentioned Date, Time And Venue, Which Shall Be Opened To Prospective Bidders. The Pre-bidding Conference And Opening Of Bids Shall Be Conducted Through Videoconferencing, Webinar Or Virtual. Please Send Your Intent To Participate To Our Email Address As Provided Below. 7. Bids Must Be Duly Received By The Bac Secretariat At Via Designated Email On Or Before November 28, 2024 At 10:00 O’clock In The Morning. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bid Opening Shall Be On November 28, 2024 At 2:00 O’clock In The Afternoon At The Bac Conference Room, Beside Procurement Office, Caraga Regional Hospital, Rizal Street, Surigao City As Virtual / Electronic Bidding. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Above. Late Bids Shall Not Be Accepted. 8. Furthermore, The Standard Philippine Bidding Document (pbd) Is Form And Part Of This Invitation In Accordance To Ra 9184 And Other Applicable Laws, Rules And Policy. 9. The Crh Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. The Opening And Receipt Of Bids Is Strictly Implemented Through Electronic Submission. Given The Covid-19 Pandemic, Procurement Activity Has Been Expedient And One Of This Is The Conduct Of Electronic Submission Of Bids. The Crh Thru The Bids And Awards Committee (bac) Has Submitted Certification, Certified By The Highest Official Managing The Information Technology, Describing The Electronic System Or Procedure To Be Used By The Crh For The Electronic Submission And Receipts Of Bids And A Statement That The Same Is Compliant With The Gppb Resolution No. 12-2020 Requirements. 11. Bidding Documents Shall Be Emailed To This Email Address, With Activated Password To: Crhbac2020@gmail.com. You May Deposit On Line For The Payment Of The Bidding Documents To This Account Below: Bank Name: Land Bank Of The Philippines Account Name: Caraga Regional Hospital-trust Fund Account Number: 0982 -1288 – 70 12. Furthermore Deposit Slip Shall Be Submitted Via Email To: Crhprocurement.bac@gmail.com. 13. The Procuring Entity Will No Longer Accept Nor Entertain Any Form Of Bids Submission Except Electronic. Failure To Comply Electronic Submission Will Be Immediately Disqualified. Guideline On The Electronic Submission Is Hereby Attached. 14. Please Fill Up The Caraga Regional Hospital Supplier’s Registry To This Link: Https://bit.ly/crh_suppliersregistry 15. For Further Information, Please Inquire To: Bac Secretariat Caraga Regional Hospital. Rizal Street, Surigao City Tel. Nos. (086) 826-1575 Local 194 (086) 826-9058 Mobile Nos: Globe: 0953-9212-832 / Smart: 0985-0508-783 E-mail Address: Crhprocurement.bac@gmail.com Fb Page: Caraga Regional Hospital – Bids And Awards Committee Approved By: (sgd) Atty. Ma. Flordelin T. Ensomo, Cpa Attorney Iv Chairman, Bids And Awards Committee
Closing Soon28 Nov 2024
Tender AmountPHP 1.3 Million (USD 22 K)

City Government Iligan Tender

Civil And Construction...+2Building Construction, Construction Material
Philippines
Details: Description Invitation To Bid The Iligan City Government Bids And Awards Committee (bac), Through General Fund / Sb No. 1 Cy 2024, Intend To Apply The Sum Of P 27,999,814.70 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Construction Of Tenement Housing, Paitan, Brgy. Dalipuga, Iligan City With Project No. Cb(b)-24-115 (ceo-infra). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Iligan City Government Bids And Awards Committee Now Invites For The Supply And Delivery Of Items Below-stated: Particulars Construction Of Tenement Housing, Paitan, Brgy. Dalipuga, Iligan City General Requirements •installation Of Project Billboard •occupational Safley And Health Program •mobilization And Demobilization •permits And Clearance •provision Of Field Office For The Engineer •field Office With Office Table, Chair, Photocopier Ink And Storage For Materials •elpdc21 Full Hd 1080p Document Camera •desktop Computer Set W/ Complete Accessories Earthworks •staking/lay-out Of Lines, Grades, Elevations And Distances •excavation Work For Pedestal Footings,septic Tanks, Catch Basins •gravel Bedding For Pedestal Footings, Grease Trap And Catch Basin •backfilling Of Common Soil Using Excavated Soil Must Be Compacted Layer By Layer Concrete Works (4000 Psi) •footing-pedestal •tie Beam •grease Trap And Catch Basin •septic Tanks •ground And Second Floor Concrete Slab (125 Mm Thk.) •stairs And Pwd Ramp •footing, Column And Slab For Metering Station •watertank Platform Masonry Works And Plastering Works •chb Wall For Partition And Metering Station1 •septic Tanks, Catch Basin And Grease Trap •watertank Platform Tiling Works •floor And Wall For Additional Cr's Painting Works •exterior And Interior Chb Wall •drywall Partition •new Painting For Ceiling ( 1st And 2nd Floor ) Structural Steel Works •column 1- W6x15 •beam 1- •column 2- W12.x53 •beam 2- •truss 1 & Truss 2 •handrail And Post For Stairs •2"x6"x2mm C Purlins •2"x3"x1.2mm C Purlins At Metering Station •16mm Dia. Cross Bracing With Std. Tumbuckel •3" Ø G.i. Pipe For Pedestal Col. At Metering Station •use 50mmx100mm Rec. Tube For Girt At Metering Station •use 50mmx50mm Rec. Tube For Truss At Metering Station •use 50mmx50mm Rec. Tube For Frame And 3"x3" Wire Mesh Cage At Metering Station •all Steel Should Be Painted With Red Oxide Primer And Top Coat With Quick Drying Enamel Electrical Works •installation Of All Electrical Conduits, Junction Box Utility Box, Electrical Panelboard According To Its Location In The Electrical Plan •installation Of Electrical Wires, Lighting Fixtures, Switches, Convenience Outlet, Aircon Outlet According To Its Location In The Electrical Plan. •termination Of All Wires In Every, Switches, Lighting Fixtures, Convenience Outlet, Aircon Outlet ,and Circuit Breaker In The Electrical Panelboard. •testing All Circuit Using The Multimeter •installation Of Service Entrance Conduit,cable And Kilowatt Hour Meter. •prepared The Electrical System For Energization. •installation Of Alarm System. Fire Protection Works •installation Of 1"ø B.i. Pipe, Sch 40 For Branch Lines. •installation Of 1 1/2" Ø B.i. Pipe, Sch 40 For Risers. •installation Of 2" Ø B.i. Pipe, Sch 40 For Cross Main. •installation Of 4" Ø B.i. Pipe, Sch 40 For Feed Main. •installation Of Sprinklers , Both Pendant And Upright Sprinklers . •installation Of Standpipes. Reinforcing Steel •footing-pedestal For Tenement Housing •footing-pedestal For Metering Station •grease Trap And Catch Basin •septic Tanks •watertank Platform Ceiling Works •ceiling Works At 2nd Floor Drywall Partition •use Drywall Partition At Bedroom Area Formworks, Scaffolding & Steel Deck •use 0.8mm Thk. Steel Deck •use 1 1/2" Gi Pipe For Scaffolding With Fixed And Swing Clamp Roofing Works •use 0.4mm Thk. Couloured Rib Type Roof For Tenement Housing And Metering Station •install Fascia Cover,gutter And Ridge Roll Plumbing Works •install Pipes (water, Soil And Waste Pipes) •installation Of Water Closets And Faucets •installation Of Kitchen Sink (heavy Duty) And Faucet For Every Units Installation Of Downspout Connected To Rain Water Collector •install 2 Sets-5,000 Liters Of Tank With 2 Sets Of 2hp Pump For Rain Water Collector Doors And Windows •d1- 1.0mx2.1m Wooden Solid Core Door With Complete Accessories •d2- 0.7mx2.1m Pvc Door With Exhaust Vent For Cr •d3- 0.8mx2.1m Hollow Core Door With Entrance Lockset •w1- 1m X 0.6m Fixed Bottom And Top Awning Window •w2- 0.4m X 0.4m Awning Window With Pvc Framing •w3 - 1.2mx1.2m Pvc Frame Sliding Window Brise Soleil •install Brise Soleil To Conceal Ac Unit And Air-dried Clothes •use 50mmx3mm Flat Bar, See Plan For Details I.general Requirements A.project Billboard (q = 2.00 Set) Includes 4' X 8' Tarpaulin Print Billboard, 8' X 8' Tarpaulin Print Billboard, 2"x 2"x 14' Coco Lumber, 2"x 3"x 10' Coco Lumber, 2"x 2"x 8' Coco Lumber, Assorted Sizes C.w Nails. B.occupational Safety And Health Program (q = 1.00 Lot) Includes Safety Signages, Caution Tape, Hard Hat, Rubber Gloves, Welding Apron, Safety Boots. C.mobilization / Demobilization (q = 1.00 Lot) D. Permits And Clearance (q = 1.00 L.s.) Includes Fire Safety Evaluation Fee, Brgy. Clearance For Construction Fee, Professional Fee, White Print (a-3). E. Provision Of Field Office For The Engineer (q = 1.00 Lot) Includes Field Office For The Field Engineer (field Office With Office Table, Chair And Storage For Materials), Elpdc21 Full Hd 1080p Document Camera, Photocopier Ink, Desktop Computer Set W/ Complete Accessories: Processor: Ryzen 5 5600x, Ram: (16gb) 8gbx2 3600mhz, Psu: 650w 80+ Gold True Rated Modular, Gpu: Nvidia Rtx 3060, Ssd: Soogb Nvme M.2, Aio Cooler: 240 Aio Cooler, Monitor: 165hz 23.8", Ups: Minimum To 650 Watts, Others: Fans, Mouse, Keyboard, And Mouse Pad. Ii.earthworks (q = 256.12 Cu.m.) Includes Imported Soil Iii.gravel Bedding (q = 130.00 Cu.m.) Includes Washed Gravel Iv.concrete Works (4000 Psi) (q = 182.84 Cu.m.) Includes 4000 Psi Premix Concrete (including Sky Pump), Portland Cement, Washed Sand, Washed Gravel. V.masonry Works (q = 1,917.40 Sq.m.) Includes Building Walls: 4" Chb 350psi, Portland Cement, Washed Sand, 10mm Ødsb X 6m; Metering Station: 4" Chb 350psi, Portland Cement, Washed Sand, 10mm Ødsb X 6m; Watertank Platform: 4" Chb 350psi,portland Cement, Washed Sand, 10mm Ødsb X 6m; Septic Vault: 4" Chb 350psi, Portland Cement, Washed Sand, 10mm Ødsb X 6m; Catch Basin: 4" Chb 350psi, Portland Cement, Washed Sand, 10mm Ødsb X 6m. Vi.plastering Works (q =3,812.00 Sq.m.) Includes Portland Cement, Screened Sand. Vii.tiling Works (q =232.40 Sq.m.) Includes Cr Flooring: 20cmx20cm Ceramic Tiles, Portland Cement, Washed Sand, Tile Adhesive; Cr Walling: 60cmx60cm Ceramic Tiles, Portland Cement, Washed Sand, Tile Adhesive Viii.painting Works (q =4,540.00 Sq.m.) Includes Skimcoat, Concrete Primer, Latex Paint (for Final Coat, 2coats), Body Filler, Paint Tray, Paint Brush, Paint Roller, Masking Tape, Sand Paper, Old Newspaper, Paint Thinner. Ix.reinforcing Steel (q =14,361.71 Kgs.) Includes 10mm Ø Dsb X 6m, 12mm Ø Dsb X 6m, 16mm Ø Dsb X 6m, No. 16 G.i.tie Wire. X.ceiling Works (q =364.00 Sq.m.) Includes 4.5mm Thk X 4' X 8' Ficem Board, Double Furring, 0.40mm Thk. X 19 X 50 X 19 X5m, Carrying Channel, Hanger Rod, Channel Clip, Wall Angle, Blind Rivets (1000pcs/box), Metal Screw. Xi.drywall Partition (q =737.52 Sq.m.) Includes 4.5mm Thk X 4' X 8' Hardilite Ficem Board, Metal Studs, 0.50mm Thk. X 2" X 3" X 2" X 3.00m, Blind Rivets (1000pcs/box), Hardiflex Screw ( Flat Head) #7x 25mm (500 Pcs). Xii.formworks, Scaffolding & Steel Deck (q =198.00 Sq.m.) Includes 3/4" X 4' X 8' Marine Plywood, Coco Lumber Assorted, 11/2" Gi Pipe (scaffold) - Rental, Fixed And Swing Clamp, 0.8mm Thick Steel Deck, Assorted Nails. Xiii.structural Steel Works (q =1.00 Lot) Includes W10x33, W12x53, W6x15, 20mm Thk Base Plate, Anchor Bolt L-type With Nut And Washer, 5/8 " X 24", Tension Rod 16mm Dia.,turn Buckles (16mm Dia.), Welding Rod (6011), 4" Cutting Disk, 4" Grinding Disk, Grout, 2"x2"x1/4" Angle Bar, 1"x1"x3mm Angle Bar, 2"x6"x2mm C Purlins, C-purlins 50x75 X 12 X 1.2x 6000mm, 3" Ø G.i. Pipe X 6m (540), Rectangular Tube 50x50x1.0mm, Rectangular Tube 50x100x1.0mm, 3" X 3" X 3.5mm Thk. Wire Mesh 6'x20', 38mm X 38mm Square Tube In Black Powdered Coat Finsh, 12mm Square Tube In Black Powdered Coat Finsh, Red Oxide Primer, Quick Dry Enamel, Paint Brush (101 Mm), Paint Thinner. Xiv. Roofing Works (q =639.24 L.m.) Includes 0.4mm Thick Rib Type Roofing, 0.4mm Thick Fascia Cover, Pre-painted Gutter (ga 24), Pre-painted Ridge Roll (ga 24), Tekscrew. Xv.electrical Works (q =1.00 Lot) Includes Beehive Lighting Fixture 6" Dia. E27 Socket; Led Bulb 6w, 230v, Daylight; Led Bulb 10w, 230v, Daylight; Ts Tube 20w Lighting Fixture; Single Gang Switch 230v; Two Gang Switch 230v; 2 Gang Convenience Outlet With Ground; 3 Way Single Gang Switch, 230v; Air Conditioning Outlet With Ground, 230v; Electrical Panelboard Plug In Type 2 Pole 4 Holes Emergency Light With 2 Bulb, 230v; 2.0mm 2 Thhn Stranded Copper Wire; 2.0mm 2 Thhn Stranded Copper Wire (grnd); 3.5mm 2 Thhn Stranded Copper Wire; 3.5mm 2 Thhn Stranded Copper Wire (grnd); 5.5mm2 Thhn Stranded Copper Wire (grnd); 5.5mm 2 Thhn Stranded Copper Wire; 8.0mm2 Thhn Stranded Copper Wire; 22.0mm 2 Thhn Stranded Copper Wire (grnd); 30.0mm2 Thhn Stranded Copper Wire; 60.0mm 2 Thhn Stranded Copper Wire; Junction Box Pvc 4x4"; Utility Box 2x4"; Pvc 15mm; Pvc 25mm; Pvc 40mm; Emt 50mm; Emt Coupling 50mm; Emt Elbow 50mm; Emt Connector 50mm; Service Entrance Cap 50mm; Safety Breaker 2 Pole Surface Mount 40at Bolt On Type With Housing; Safety Breaker 2 Pole Surface Mount 10at Bolt On Type With Housing; 15at Circuit Breaker 2 Pole Plug In Type; 20at Circuit Breaker 2 Pole Plug In Type; 40at Circuit Breaker 2 Pole Plug In Type; 30at Circuit Breaker 2 Pole Bolt On Type; 20at Circuit Breaker 2 Pole Bolt On Type; 100at Molded Case Circuit Breaker 3 Pole Bolt On Type 25kaic ,230v Tqd; 175at Molded Case Circuit Breaker 3 Pole Bolt On Type , 10kaic Tqd; Nema 3r 3 Pole Enclosure For 175at Mccb Tqd; Electrical Panelboard 8 Branches Plus 1main Tqd, 3 Pole Bolt On Type; Supply Of 25kva, 13.2kv/230v, Transformer Station & Accessories; 40-ft Concrete Pole With Guy & Anchor, 3-spool Secondary Racks; Emergency Exit Lamp; Electrical Tape; Wire Gutter 8x8x48"; Electrical Meter Base Class Ooa Round Type 1/2"; Single Phase Kw-hr Meter (digital Type) 1-210 Cl200 2w 240v, 30-200a; Electrical Rubber Tape; Solvent Cement 100cc. Xvi.fire Protection Works (q =1.00 Lot) Includes 1"ø B.i. Pipe, Sch 40 (branch Line) - 6m/pc; 11/2" Ø B.i. Pipe, Sch 40 (riser) - 6m/pc; 2" Ø B.i. Pipe, Sch 40 (cross Main) - 6m/pc; 4" Ø B.i. Pipe, Sch 40 (feed Main) - 6m/pc; 1" Ø B.i. 90 Deg Elbow, Sch 40; 11/2" Ø B.i. 90 Deg Elbow, Sch 40; 2" Ø B.i. 90 Deg Elbow, Sch 40; 4" Ø B.i. 90 Deg Elbow, Sch 40; 1" Ø B.i. Tee, Sch 40; 2" Ø B.i. Tee, Sch 40; 4" Ø B.i. Tee, Sch 40; 4" Ø To 2" Ø B.i. Tee Reducer, Sch 40; 2" Ø To 11/2" Ø B.i. Tee Reducer, Sch 40; 11/2" Ø To 1" Ø B.i. Tee Reducer, Sch 40; 1" Ø To 3/4" Ø B.i. Reducer, Sch 40; 11/2" Ø To 1" Ø B.i. Reducer, Sch 40; 3" Ø B.i. Blind Flange, Ansi #150 W/ Accessories; 6" Ø B.i. Blind Flange, Ansi #150 W/ Accessories; 2" Ø Gate Valve; 4" Ø O.s. & Y. Gate Valve; 4" Ø Swing Check Valve; 2" Ø Check Valve; 1" Ø Ball Valve; Pressure Gauge; Waterflow Switch; 1" Ø Sight Glass; 2" Ø Sight Glass; Union; Siamese Fire Department Connection; 1" Ø Pipe Hanger (loop Hanger And Threaded Rod); 2" Ø Pipe Hanger (loop Hanger And Threaded Rod); 4" Ø Pipe Hanger (loop Hanger And Threaded Rod); 1" Ø Riser Clamp; 2" Ø Riser Clamp; 4" Ø Riser Clamp; 3/4" Ø Pendent Sprinkler Head; 3/4" Ø Upright Sprinkler Head; Fire Hose Cabinets W/ Accessories; Fire Extinguishers; Red Oxide Metal Primer; Alarm Bell; Manual Pull Station. Xvii.plumbing Works (q =1.00 Lot) Includes Two Piece Water Closet; Stainless Steel Kitchen Sink; Hose Bibb, Heavy Duty; Kitchen Faucet, Heavy Duty; 5000l Stainless Steel Tank; 4" Floor Drain; 4" Ø Sanitary Wye; 4"x2" Ø Sanitary Wye Reducer; 4" Ø Pvc Tee; 4" X 2" Ø Pvc Tee Reducer; 4" Ø Pvc 1/8 Bend; 4" Ø Pvc 1/4 Bend; 4" Ø Cleanout; 4" Ø Coupling; 4"x2" Ø Coupling Reducer; 4" Ø Pvc Pipe S1000; 3" Ø Sanitary Wye; 3" Ø Cleanout; 3" Ø Pvc 1/8 Bend; 3" Ø Pvc Pipe S1000; 2" Ø Pvc Pipe S1000; 2" Ø Pvc 1/8 Bend; 2" Ø Pvc 1/4 Bend; 2" Ø Pvc Wye; 2" Ø Pvc P-trap; 2" Ø Pvc Tee; 2" Ø Cleanout; 2" Ø Coupling; 1/2" Ø Ppr Pn10 Pipe; 1/2" Ø Ppr Tee; 1/2" Ø Ppr Elbow; Steel Strap; Solvent Cement; 2hp Centrifugal Pump. Xviii.doors And Win Dows (q =l.00 Lot) Includes Dl- 1.0mx2.lm Wooden Solid Core Door With Complete Accessories; D2- 0.7m X 2.1m Pvc Door With Exhaust Vent For Cr; D3- 0.8mx2.1m Hollow Core Door With Entrance Lockset; W1-1m X 0.6m Fixed Bottom And Top Awning Window; W2- 0.4m X 0.4m Awning Window With Pvc Framing; W3 - 1.2mx1.2m Pvc Frame Sliding Window. Xix.brise Soleil (q =2,847.20 Kgs.) Includes 50 X 3mm Flat Bar, Welding Rod, Cutting Disk, 10mm Dia. Expansion Bolt, 10mm Bi Plate, Grinding Disk. Approved Budget For The Contract (abc): P 27,999,814.70 Required Bid Security: 2% Of The Abc If Cash, Manager’s Check; Bank Draft/guarantee, Irrevocable Letter Of Credit Confirmed Or Authenticated By A Universal Or Commercial Bank; And 5% Of The Abc If Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security Delivery Period Is Within Three Hundred Sixty (360) Calendar Days From Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Three (3) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. Interested Bidders May Obtain Further Information From Iligan City Government And Inspect The Bidding Documents During Office Hours From 8:00 A.m. – 12:00 P.m. And 1:00 P.m. – 5:00 P.m. At The Office Of The Bids And Awards Committee, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule 1. Pre-procurement: October 8, 2024 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 2. Issuance Of Bid Documents: November 5 – November 26, 2024 – 8:00 A.m. At Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. 3. Pre-bid Conference: November 12, 2024 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 4. Submission Of Bids: November 26, 2024 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 5. Opening Of Bids: November 26, 2024 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City A Complete Set Of Bidding Documents Will Be Available To Prospective Bidders Upon Payment Of A Non-refundable Amount Of P 25,000.00 To The Iligan City Government Cashier, At The Bac Office, 2nd Floor, City Hall Main Building, Buhanginan Hills, Pala-o, Iligan City. The Iligan City Government Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Furthermore, The City Government Of Iligan Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Or Loss Incurred In The Preparation And Submission Of The Eligibility Statements And Bids. Approved By: (signed)darwin J. Manubag, Phd. Bac Chairman Date Of Advertisement/posting: November 5, 2024 Place Of Posting/advertisement: City Hall/ibjt Bulletin Boards, Iligan Official Website, Phil-geps Itb No. 24-115 (ceo-infra)
Closing Soon26 Nov 2024
Tender AmountPHP 27.9 Million (USD 474.9 K)

Iqs Nano Ltd Tender

Others
Czech Republic
Details: The subject of the performance of this order is the delivery of the performance expected in the framework of the planned subsidy project "development of a standardized nanostructured substrate and an analytical system for routine analysis by surface-enhanced Raman spectroscopy" Registration Number Cz.01.01.01/01/22_002/0000650. The subject of the Public Contract is the Complex Supply of Services United with the Development of the Control System of the Optical and Electronic Subsystems of the Prototype Laser Stereo-lithographic System Working on the Principle of Two Photon Polymerization (slw-2pp). The Public Order includes the supply of services including, in particular, the work of programming the controller SW/firmware based on the requirements described in the technical specification of the order, testing and implementation on the lithographic device. Technical Specification of the Subject of the Contract: A. Modifications and Upgrades of the Control Sw and Fw for the Purpose of Increasing the Production Speed of Existing Lithographic Devices I. Implementation of the Mode of Vector Writing of Structures During the Xy Table Movement With the Possibility of Entering a General Trajectory, for example From a 3d Slicer. II. Design And Implementation Of A Method For Entering Data Bases Using Mathematical Precepts With The Possibility Of Saving These Templates In Libraries For Future Use. III. Sw/fw Solution Options Variable Voxel Size Changes. E.g. Voxel Expansion Using Fast Deflection Unit In Areas With Absence Of Significant Details To Increase Write Speed Iv. Control And Synchronization Of The Deflection Unit (acousto-optic Modulators And Deflectors (aom, Aod). V. Realization Of The Possibility Of Writing A Fill Motif In The Areas Defined By The Mask. Vi. Control Of The Digital Camera Including Image Processing Functions For Autofocus. Vii. Control And Optimization Of The Data And Control Flow Between The Computer Station And Control Cards. Synchronization of the Exposure Process with the Movement of the Piezoelectric Nanopositioning System for the Purpose of Minimizing the Loss of Time During Changes from the Coordinate. X. Optimizing the Communication Between the Control Computer and the Exposure Unit Controlling the Individual Subsystems of the Lithographic Device. B. Modifications and Upgrades of Control Sw and Fw for the Purpose of Increasing the Recording Quality of Existing Lithographic Devices I. Implementation and Testing of Deflection Field Calibration Methods Using Various Tools (Photodiode, Camera, Etc.) Ii Field B. Software Modularization Allowing Simple Addition Or Removal Of Modules (Table Control Module, Aod Control Module, Etc.) C. Creating Dll Api Libraries Of Controlling Sw So That It Is Possible To Call It In An Independent Gui. D. Creation of C++ / Python Interface APIs Including Implementation of Current Vector Mode C-Script Functions in Python. E. Ensuring the Optimization of the Control Sw Based on the Changes of All Extensions and the Above-mentioned Modifications of the Existing System. F. Ensuring Technical and Software Support for the Proper Operation of Systems on which Work is Performed by the Contractor, During the Term of the Contract. The order is not divided into parts. The contracting authority does not intend to discuss offers with the participants within the meaning of Art. 5.4 of the Rules.
Closing Soon25 Nov 2024
Tender AmountRefer Documents 

Department Of Environment And Natural Resources - DENR Tender

Others
Philippines
Details: Description Republic Of The Philippines Department Of Environment And Natural Resources Office Of The Penro City Of Ilagan, Isabela Telefax No.: (078) 325-5701 Procurement Of One (1)-year Security Services For The Department Of Environment And Natural Resources (denr-isabela) Provincial And Community Field Offices For Fy 2025 Bids And Awards Committe November 2024 Preface These Philippine Bidding Documents (pbds) For The Procurement Of Goods Through Competitive Bidding Have Been Prepared By The Government Of The Philippines For Use By Any Branch, Constitutional Commission Or Office, Agency, Department, Bureau, Office, Or Instrumentality Of The Government Of The Philippines, National Government Agencies, Including Government-owned And/or Controlled Corporations, Government Financing Institutions, State Universities And Colleges, And Local Government Unit. The Procedures And Practices Presented In This Document Have Been Developed Through Broad Experience, And Are For Mandatory Use In Projects That Are Financed In Whole Or In Part By The Government Of The Philippines Or Any Foreign Government/foreign Or International Financing Institution In Accordance With The Provisions Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184. The Bidding Documents Shall Clearly And Adequately Define, Among Others: (i) The Objectives, Scope, And Expected Outputs And/or Results Of The Proposed Contract Or Framework Agreement, As The Case May Be; (ii) The Eligibility Requirements Of Bidders; (iii) The Expected Contract Or Framework Agreement Duration, The Estimated Quantity In The Case Of Procurement Of Goods, Delivery Schedule And/or Time Frame; And (iv) The Obligations, Duties, And/or Functions Of The Winning Bidder. Care Should Be Taken To Check The Relevance Of The Provisions Of The Pbds Against The Requirements Of The Specific Goods To Be Procured. If Duplication Of A Subject Is Inevitable In Other Sections Of The Document Prepared By The Procuring Entity, Care Must Be Exercised To Avoid Contradictions Between Clauses Dealing With The Same Matter. Moreover, Each Section Is Prepared With Notes Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Shall Not Be Included In The Final Documents. The Following General Directions Should Be Observed When Using The Documents: A.all The Documents Listed In The Table Of Contents Are Normally Required For The Procurement Of Goods. However, They Should Be Adapted As Necessary To The Circumstances Of The Particular Procurement Project. B.specific Details, Such As The “name Of The Procuring Entity” And “address For Bid Submission,” Should Be Furnished In The Instructions To Bidders, Bid Data Sheet, And Special Conditions Of Contract. The Final Documents Should Contain Neither Blank Spaces Nor Options. C.this Preface And The Footnotes Or Notes In Italics Included In The Invitation To Bid, Bid Data Sheet, General Conditions Of Contract, Special Conditions Of Contract, Schedule Of Requirements, And Specifications Are Not Part Of The Text Of The Final Document, Although They Contain Instructions That The Procuring Entity Should Strictly Follow. D.the Cover Should Be Modified As Required To Identify The Bidding Documents As To The Procurement Project, Project Identification Number, And Procuring Entity, In Addition To The Date Of Issue. E.modifications For Specific Procurement Project Details Should Be Provided In The Special Conditions Of Contract As Amendments To The Conditions Of Contract. For Easy Completion, Whenever Reference Has To Be Made To Specific Clauses In The Bid Data Sheet Or Special Conditions Of Contract, These Terms Shall Be Printed In Bold Typeface On Sections I (instructions To Bidders) And Iii (general Conditions Of Contract), Respectively. F.for Guidelines On The Use Of Bidding Forms And The Procurement Of Foreign-assisted Projects, These Will Be Covered By A Separate Issuance Of The Government Procurement Policy Board. Table Of Contents Glossary Of Acronyms, Terms, And Abbreviations 5 Section I. Invitation To Bid 7 Section Ii. Instructions To Bidders 10 1. Scope Of Bid 11 2. Funding Information 11 3. Bidding Requirements 11 4. Corrupt, Fraudulent, Collusive, And Coercive Practices 11 5. Eligible Bidders 11 6. Origin Of Goods 13 7. Subcontracts 13 8. Pre-bid Conference 13 9. Clarification And Amendment Of Bidding Documents 13 10. Documents Comprising The Bid: Eligibility And Technical Components 13 11. Documents Comprising The Bid: Financial Component 14 12. Bid Prices 14 13. Bid And Payment Currencies 15 14. Bid Security 15 15. Sealing And Marking Of Bids 15 16. Deadline For Submission Of Bids 16 17. Opening And Preliminary Examination Of Bids 16 18. Domestic Preference 16 19. Detailed Evaluation And Comparison Of Bids 16 20. Post-qualification 17 21. Signing Of The Contract 17 Section Iii. Bid Data Sheet 18 Section Iv. General Conditions Of Contract 20 1. Scope Of Contract 21 2. Advance Payment And Terms Of Payment 21 3. Performance Security 21 4. Inspection And Tests 21 5. Warranty 22 6. Liability Of The Supplier 22 Section V. Special Conditions Of Contract 23 Section Vi. Schedule Of Requirements 27 Procurement Of Security Services Covering The Period Of January 1, 2025 To December 31, 2025 28 1.0 Provision Of Security Guards, Including The Submission Of Security Plan 28 2.0 Provision Of Uniform, Security Equipment, And Paraphernalia 29 3.0 Service Standards And Conditions 29 4.0 General Conditions 30 5.0 Payment Terms 31 6.0 Performance Review And Assessment 31 Section Vii. Technical Specifications 34 Section Viii. Checklist Of Technical And Financial Documents 37 Section Ix. Detailed Financial Breakdown 39 Glossary Of Acronyms, Terms, And Abbreviations Abc – Approved Budget For The Contract. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Cda - Cooperative Development Authority. Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Cif – Cost Insurance And Freight. Cip – Carriage And Insurance Paid. Cpi – Consumer Price Index. Ddp – Refers To The Quoted Price Of The Goods, Which Means “delivered Duty Paid.” Dti – Department Of Trade And Industry. Exw – Ex Works. Fca – “free Carrier” Shipping Point. Fob – “free On Board” Shipping Point. Foreign-funded Procurement Or Foreign-assisted Project– Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Framework Agreement – Refers To A Written Agreement Between A Procuring Entity And A Supplier Or Service Provider That Identifies The Terms And Conditions, Under Which Specific Purchases, Otherwise Known As “call-offs,” Are Made For The Duration Of The Agreement. It Is In The Nature Of An Option Contract Between The Procuring Entity And The Bidder(s) Granting The Procuring Entity The Option To Either Place An Order For Any Of The Goods Or Services Identified In The Framework Agreement List Or Not Buy At All, Within A Minimum Period Of One (1) Year To A Maximum Period Of Three (3) Years. (gppb Resolution No. 27-2019) Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Gppb – Government Procurement Policy Board. Incoterms – International Commercial Terms. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Supplier – Refers To A Citizen, Or Any Corporate Body Or Commercial Company Duly Organized And Registered Under The Laws Where It Is Established, Habitually Established In Business And Engaged In The Manufacture Or Sale Of The Merchandise Or Performance Of The General Services Covered By His Bid. (item 3.8 Of Gppb Resolution No. 13-2019, Dated 23 May 2019). Supplier As Used In These Bidding Documents May Likewise Refer To A Distributor, Manufacturer, Contractor, Or Consultant. Un – United Nations. Section I. Invitation To Bid Invitation To Bid Procurement Of One (1)-year Security Services For The Department Of Environment And Natural Resources (denr-isabela) Provincial And Community Field Offices For Fy 2025 1.the Denr Provincial Environment And Natural Resources Office-isabela (denr Penro Isabela) Of The National Expenditure Program (nep) For Fy 2025 Intends To Apply The Sum Of Three Million Two Hundred Forty-five Thousand Four Hundred Seventy-one Pesos & 04/100 (₽3,245,471.04) Being The Approved Budget For The Contract (abc) To Payment Under The Contract For The Procurement Of One (1)-year Security Services For The Department Of Environment And Natural Resources (denr-isabela) Provincial And Community Field Offices For Fy 2025. Bids Received In Excess Of The Abc Shall Automatically Be Rejected At Bid Opening. Late Bids Shall Not Be Accepted. 2.the Denr Now Invites Bids For The Above Procurement Project. The Security Services Shall Commence Upon The Receipt Of The Notice To Proceed (ntp) Until 31 December 2025. Bidders Should Have Completed, Within The Last Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). Similar Project Shall Mean “procurement Of Security Services”. 3.bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4.prospective Bidders May Obtain Further Information From Denr And Inspect The Bidding Documents At The Address Given Below From Mondays To Fridays, 9:00 Am To 4:00 Pm. 5.a Complete Set Of Bidding Documents May Be Acquired By Interested Bidders Starting November 8, 2024 Until The Submission Of Bids From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (p 5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. 6.the Denr-penro Ilagan, Isabela Will Hold A Pre-bid Conference On November 18, 2024, 1:30 Pm At The Pinaroc Hall, Penr Office, Osmeña, City Of Ilagan, Isabela Which Shall Be Open To Prospective Bidders. Authorized Representatives Of Bidders Shall Join The Meeting Via Virtual Platform. 7.bids Must Be Duly Received By The Bac Secretariat Or The Penro-isabela Records Section Through Manual Submission At The Office Address Indicated Below On Or Before November 28, 2024, 8:30 A.m. Late Bids Shall Not Be Accepted. 8.all Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9.bid Opening Shall Be On November 28, 2024, 9:00 Am At The Given Address Below. Bids Will Be Opened In The Presence Of The Authorized Bidders’ Representatives Who Choose To Attend The Activity. 10.the Penro-isabela Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Preciosa G. Oñate Head, Bac Secretariat Denr-penr Office Osmeña, City Of Ilagan, Isabela Penroisabela@denr.gov.ph C.p. No.: 0917-628-3429 You May Download The Bidding Documents At Philgeps Website. November 5, 2024 Luz S. Soriano Chief, Administrative Officer Chairperson, Bids And Awards Committee Section Ii. Instructions To Bidders 1.scope Of Bid The Procuring Entity, Denr Penro Isabela Wishes To Receive Bids For The Procurement Of One (1)-year Security Services For The Department Of Environment And Natural Resources-isabela (denr-isabela) Provincial And Community Field Offices For Fy 2025. The Procurement Project (referred To Herein As “project”) Is Composed Of One (1) Lot, The Details Of Which Are Described In Section Vii (technical Specifications). 2.funding Information 2.1.the Gop Through The Source Of Funding As Indicated Below For Fy 2025 In The Amount Of Three Million Two Hundred Forty-five Thousand Four Hundred Seventy-one Pesos & 04/100 (₽3,245,471.04) A.the Source Of Funding Is Nep, National Expenditure Program. 3.bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4.corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5.eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. [select One, Delete Other/s] A.foreign Ownership Exceeding Those Allowed Under The Rules May Participate Pursuant To: I.when A Treaty Or International Or Executive Agreement As Provided In Section 4 Of The Ra No. 9184 And Its 2016 Revised Irr Allow Foreign Bidders To Participate; Ii.citizens, Corporations, Or Associations Of A Country, Included In The List Issued By The Gppb, The Laws Or Regulations Of Which Grant Reciprocal Rights Or Privileges To Citizens, Corporations, Or Associations Of The Philippines; Iii.when The Goods Sought To Be Procured Are Not Available From Local Suppliers; Or Iv.when There Is A Need To Prevent Situations That Defeat Competition Or Restrain Trade. B.foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: [select One, Delete The Other/s] A.for The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. B.for The Procurement Of Expendable Supplies: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty-five Percent (25%) Of The Abc. C.for Procurement Where The Procuring Entity Has Determined, After The Conduct Of Market Research, That Imposition Of Either (a) Or (b) Will Likely Result To Failure Of Bidding Or Monopoly That Will Defeat The Purpose Of Public Bidding: The Bidder Should Comply With The Following Requirements: [select Either Failure Or Monopoly Of Bidding Based On Market Research Conducted] I.completed At Least Two (2) Similar Contracts, The Aggregate Amount Of Which Should Be Equivalent To At Least Fifty Percent (50%) In The Case Of Non-expendable Supplies And Services Or Twenty-five Percent (25%) In The Case Of Expendable Supplies] Of The Abc For This Project; And Ii.the Largest Of These Similar Contracts Must Be Equivalent To At Least Half Of The Percentage Of The Abc As Required Above. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6.origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7.subcontracts 7.1.the Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Twenty Percent (20%) Of The Project. The Procuring Entity Has Prescribed That: Subcontracting Is Not Allowed. 7.2.subcontracting Of Any Portion Of The Project Does Not Relieve The Supplier Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Supplier’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8.pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address And/or Through Videoconferencing As Indicated In The Ib. 9.clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10.documents Comprising The Bid: Eligibility And Technical Components 10.1.the First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2.the Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within The Last Five (5) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3.if The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11.documents Comprising The Bid: Financial Component 11.1.the Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2.if The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3.any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4.for Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12.bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A.for Goods Offered From Within The Procuring Entity’s Country: I.the Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii.the Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii.the Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv.the Price Of Other (incidental) Services, If Any, Listed In The Bds. B.for Goods Offered From Abroad: I.unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii.the Price Of Other (incidental) Services, If Any, As Listed In The Bds. 13.bid And Payment Currencies 13.1.for Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2.payment Of The Contract Price Shall Be Made In Philippine Pesos. 14.bid Security 14.1.the Bidder Shall Submit A Bid Securing Declaration[ In The Case Of Framework Agreement, The Undertaking Shall Refer To Entering Into Contract With The Procuring Entity And Furnishing Of The Performance Security Or The Performance Securing Declaration Within Ten (10) Calendar Days From Receipt Of Notice To Execute Framework Agreement.] Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2.the Bid And Bid Security Shall Be Valid One Hundred Twenty Calendar Days From The Date Of Opening Of Bids. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15.sealing And Marking Of Bids Each Bidder Shall Submit One (1) Originally Signed Certified True Copy Of The Original Document And Two (2) Duplicate Copies Of The First And Second Components Of Its Bid. Bidder Must Arrange Each Bid Documents Into Sections With Tabs Properly Labeled Separating Each Document According To The Provided Checklist. All Envelopes Shall: (a)contain The Name Of The Contract To Be Bid In Capital Letters; (b)bear The Name And Address Of The Bidder In Capital Letters; (c)be Addressed To The Procuring Entity’s Pbac; (d)bear The Specific Identification Of This Bidding Process Indicated In The 1.0; And (e)bear A Warning “do Not Open Before…” The Date And Time For The Opening Of Bids, As Specified In The Ib. To : The Provincial Bids And Awards Committee Provincial Environment And Natural Resources Office From : __________________________________________ (name Of Bidder In Capital Letters) Address : ________________________________________ (address Of Bidder In Capital Letters) Project : _____________________________________________ (in Capital Letters, Indicate The Phrase): “do Not Open Before: _____________________________________ 16.deadline For Submission Of Bids 16.1. The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In The Ib. 17.opening And Preliminary Examination Of Bids 17.1.the Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2.the Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18.domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.detailed Evaluation And Comparison Of Bids 19.1.the Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.2.if The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 14 Shall Be Submitted For Each Lot Or Item Separately. 19.3.the Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4.the Project Shall Be Awarded As Follows: One Project Having Several Items That Shall Be Awarded As One Contract. 19.5.except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20.post-qualification 20.2. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21.signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A.“procurement Of Security Services”; And B.completed Within The Last Five (5) Years Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 Subcontracting Is Not Allowed. 12 The Price Of The Goods Shall Be Quoted Ddp Philippines Or The Applicable International Commercial Terms (incoterms) For This Project. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: The Amount Of Not Less Than Two Percent (2%) Of Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or The Amount Of Not Less Than Five Percent (5%) Of Abc If Bid Security Is In Surety Bond. 15 Each Bidder Shall Submit One (1) Originally Signed Certified True Copy Of The Original Document And Two (2) Duplicate Copies Of The First And Second Components Of Its Bid. Bidder Must Arrange Each Bid Documents Into Sections With Tabs Properly Labeled Separating Each Document According To The Provided Checklist 19.3 The Project Will Be Awarded As One (1) Lot. 20.2 No Further Instructions. 21.2 Within Ten (10) Calendar Days From Receipt Of Notice Of Award, Successful Bidder Shall Post The Required Performance Security, Sign And Date The Contract And Return It To Denr. Section Iv. General Conditions Of Contract 1.scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1. Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2. The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than Prior To The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184 4. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Iv (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 6.1. In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 6.2. The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Special Conditions Of Contract Special Conditions Of Contract Gcc Clause 1 Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: “the Delivery Terms Applicable To This Contract Are Delivered In Penr Office And Cenr Offices. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is: Miguel L. Vasquez Supply Officer I Chief, General Services Unit Denr Penro Isabela Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: A.performance Or Supervision Of On-site Assembly And/or Start-up Of The Supplied Goods; B.furnishing Of Tools Required For Assembly And/or Maintenance Of The Supplied Goods; C.furnishing Of A Detailed Operations And Maintenance Manual For Each Appropriate Unit Of The Supplied Goods; D.performance Or Supervision Or Maintenance And/or Repair Of The Supplied Goods, For A Period Of Time Agreed By The Parties, Provided That This Service Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Packaging – The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. The Packaging, Marking, And Documentation Within And Outside The Packages Shall Comply Strictly With Such Special Requirements As Shall Be Expressly Provided For In The Contract, Including Additional Requirements, If Any, Specified Below, And In Any Subsequent Instructions Ordered By The Procuring Entity. The Outer Packaging Must Be Clearly Marked On At Least Four (4) Sides As Follows: Name Of The Procuring Entity Name Of The Supplier Contract Description Final Destination Gross Weight Any Special Lifting Instructions Any Special Handling Instructions Any Relevant Hazchem Classifications A Packaging List Identifying The Contents And Quantities Of The Package Is To Be Placed On An Accessible Point Of The Outer Packaging If Practical. If Not Practical The Packaging List Is To Be Placed Inside The Outer Packaging But Outside The Secondary Packaging. Transportation – Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip, Or Ddp, Transport Of The Goods To The Port Of Destination Or Such Other Named Place Of Destination In The Philippines, As Shall Be Specified In This Contract, Shall Be Arranged And Paid For By The Supplier, And The Cost Thereof Shall Be Included In The Contract Price. Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Goods Are To Be Transported On Carriers Of Philippine Registry. In The Event That No Carrier Of Philippine Registry Is Available, Goods May Be Shipped By A Carrier Which Is Not Of Philippine Registry Provided That The Supplier Obtains And Presents To The Procuring Entity Certification To This Effect From The Nearest Philippine Consulate To The Port Of Dispatch. In The Event That Carriers Of Philippine Registry Are Available But Their Schedule Delays The Supplier In Its Performance Of This Contract The Period From When The Goods Were First Ready For Shipment And The Actual Date Of Shipment The Period Of Delay Will Be Considered Force Majeure. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Intellectual Property Rights – The Supplier Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 2.2 Monthly Payment Shall Be Made Upon Submission Of Complete Documentary Requirements In Accordance With Prevailing Accounting And Auditing Rules And Regulations. 4 Applicable Inspection And Testing Shall Be Conducted By The Inspection And Pre-acceptance Committee Of The Office. Section Vi. Schedule Of Requirements Terms Of Reference Procurement Of Security Services Covering The Period Of January 1, 2025 To December 31, 2025 1.0 Provision Of Security Guards, Including The Submission Of Security Plan A.qualification Of The Security Agency: 1.1 Stability 1.1years Of Experience – At Least Three (3) Years In The Security Business 1.2organizational Setup – In Accordance With Ra No. 5487 And Its Implementing Rules And Regulations 1.3with Valid License To Operate From The Philippine National Police (pnp) – Supervisory Office For Security And Investigation Agencies (sosia) 1.4must Be A Member Of The Philippines Association Of Detective And Protective Agency Operators (padpao); 1.5with Certificate Of Registration In Accordance With Department Of Labor And Employment Department Order No. 18-a, S. 2011 1.2 Resources 1.1number And Kind Of Equipment And Supplies – With The Minimum Number And Kind Of Equipment And Supplies As Specified In Item No. 2.0 1.2number Of Guards – With At Least Ten (10) Security Guards That Are Organic To The Contractor 1.3number Of Supervisors – At Least One (1) Supervisor B.the Contractor Shall Provide Seven (7) Qualified, Bonded, Uniformed, Highly-trained Security Guards Who Must Meet The Following Requirements: I.with At Least Two (2) Years Of Experience In Security Services; Ii.must Have Completed A Private Security Training From A Government Or Duly Registered And Accredited Private Training Institution/s; Iii.must Have Undergone First-aid And Basic-life Support Course Certified By The Philippine National Red Cross; Iv.with Valid License To Exercise Private Security Profession; V.of Good Moral Character And Must Not Have Violated Any Rules And Regulations Under Ra No. 5487 And Its Implementing Rules And Regulations (irr); Vi.fit To Work, As Evidenced By A Medical Certificate Issued Within The Last Two (2) Months (specify That The Security Guard Is Fit To Work); And C.the Contractor Shall Submit Within Three (3) Calendar Days From Receipt Of Notice To Proceed The Employee File Of Each Security Guard With Complete Attachments Such As, But Not Limited To, Resume, Training Certificate, Government-mandated Clearances, Medical Certificate, Physical And Neuro-psychiatric Test Results. D.the Contractor Shall Assign A Supervisor Or Authorized Representative From Its Own Account, Separate From The Deployed Personnel To Monitor The Performance Of The Security Guards And Handle The Consolidation Of Daily Timecards Periodically In Preparation For The Monthly Billing To The Denr Penro Isabela. E.there Shall Be No Employer-employee Relationship Between Denr Isabela And The Security Guards And/or Other Personnel Employed By The Contractor. . F.the Contractor Shall Ensure That Security Guards Perform The Security Services In Accordance With The Service Standards And Conditions Considering The Following: I.security Of Human Resources Ii.security For Physical Resources Iii.contingency Plan For Various Risks Iv.other Related Security Concerns 2.0 Provision Of Uniform, Security Equipment, And Paraphernalia A.the Contractor Shall Ensure That The Security Guards Assigned To The Denr Isabela Shall Observe Proper Philippine National Police - Supervisory Office For Security And Investigation Agencies (pnp-sosia) Prescribed Uniforms. B.the Contractor Shall Provide The Following Security Equipment And Paraphernalia, Which Are Brand New Or In Good Condition: : Item Description Quantity 1 At Least One (1) Set Of Prescribed Uniform, Including Provision Of Face Mask, Per Security Guard 7 Sets 2 Nightstick/baton 3 Whistle 4 Flashlight 5 First-aid Kit 6 Handcuffs 7 Service Firearms -with Necessary License -security Guards Who Shall Be Handling The Firearms Must Have Prior Training One (1) Firearm For Every Security Guards Or As Required 8 Metal Detector 7 9 Raincoat, Rainboots, And Umbrella 7 3.0 Service Standards And Conditions Deployed Security Guards Shall Be Professional And Courteous At All Times. The Expected Service Standards And Conditions Are As Follows: A.security Guards Shall At All Times Ensure The Security Of Denr Isabela Officials And Employees, Physical Resources, And Respond To All Other Security Related Concerns In Accordance With The Approved Security Plan. B.the Contractor Shall Recommend The Enforcement Of Policies, Rules And Regulations Of The Denr Isabela And, Upon The Approval Of The Penr Officer Or Its Authorized Representative, Implement Them In Order To Maintain Peace And Order Within The Denr Isabela Premises. C.whenever Required By The Penr Officer Or The End-users, Or If Deemed Necessary By The Supervisor, The Contractor Shall Investigate Any Security Breach Within The Denr Isabela Premises, Including The Commission Of Any Crime, And Submit A Report To The Penr Officer Through The Chief, Management Services Division (chief, Msd). D.the Contractor Shall Assume Full Responsibility And Undertake To Reimburse The Denr Isabela For Losses, Damages, And Injuries Caused To The Denr Isabela’s Properties And Personnel, Which The Contractor Is Bound To Secure And Protect. E.the Contractor Warrants To Make Available, At All Times, Relievers And/or Replacements To Ensure Continuous And Uninterrupted Services In Case Of Absences, And Shall Execute The Necessary Supervision Over The Work Of Its Personnel. 4.0 General Conditions A.the Denr Isabela Has The Right To Effect Changes In The Assignment/deployment Of The Security Guards At Any Time During The Contract Period Through A Written Notice To The Contractor. Likewise, The Denr Isabela May Increase Or Decrease The Number Of Security Guards As May Be Necessary. In Such An Event, Any Corresponding Adjustment In The Cost Shall Not Exceed The Contract Price. B.the Contractor Shall Not Reshuffle Personnel Without The Prior Clearance/approval Of The Msd Chief Of Denr Isabela Which Hereby Reserves The Right To Reject Any Proposal To Reassign Personnel If Such Reassignment Is Found To Pose An Imminent Danger Or Prejudice To The Service. It Is However Understood That On Matters Of Disciplinary Action Toward The Personnel Of The Contractor, The Msd Chief Shall Cooperate With The Contractor Or Vice Versa By Means Of Mutual Consultation. C.the Contractor Shall Always Make Available Relievers And/or Replacements To Ensure Continuous And Uninterrupted Services. D.the Contractor Agrees That The Denr Isabela, Through The Msd Chief, Reserves The Right To Screen And Accept Or Deny The Deployment Of Any Personnel Recommended By The Contractor. E.the Contractor Shall Pay Its Personnel Not Less Than The Minimum Wage And Other Benefits Mandated By The Laws, Rules And Regulations. The Contractor Shall Provide The Security Guards Their Monthly Pay Slip Containing The Necessary Information On It. The Contractor Shall Comply With The Laws Governing Labor Standards And Employee’s Compensation. A Certificate For This Purpose Shall Be Required From The Contractor. F.the Contractor Shall Provide The Personnel With Appropriate Uniforms, Protective Gear And Ensure That They Shall Observe Proper Personal Hygiene And Always Appear Neat And Clean. G.the Contractor Shall Have At Least One (1) Reliever For The Denr Isabela Available At Any Time To Take Over In Case Of Absence Of Security Personnel At No Extra Cost To The Denr Isabela. No Trainees Shall Be Allowed As A Reliever Even If They Are Allowed And Identified As Such. H.the Contractor Shall Ensure The Confidentiality Of Information. I.the Duration Of The Contract Shall Commence Upon The Receipt Of Ntp Until 31 December 2025. 5.0 Payment Terms A.the Contractor Shall Submit, Along With The Monthly Billing Statement, A Certified True Copy Of Duly Accomplished Payroll Sheet, Receipts, Prescribed Reports Stamped Received By Sss, Pag-ibig, Philhealth, And Ecc As Proof Of Remittances Of Employer’s And Employee’s Contributions For Sss, Philhealth And Pag-ibig Premiums Of The Security Guards Assigned To The Denr Isabela Only. B.the Contractor In The Performance Of Its Services Shall Secure, Maintain At Its Own Expense All Registration, Licenses Or Permits Required By Law, And Shall Comply With All Pertinent Rules And Regulations. The Contractor’s Personnel Shall Take All Necessary Precautions For The Safety Of All Persons And Properties At Or Near Their Area Of Work And Shall Comply With All The Standards And Established Safety Regulations, Rules And Practices. 6.0 Performance Review And Assessment A.the Contractor Shall Maintain A Satisfactory Level Of Performance Throughout The Contract Period Based On The Following Set Of Performance Criteria: Performance Criteria Weight I Conformity To Technical Requirements (25) Ii Timeliness In The Delivery Of Services (25) Iii Behavior Of Personnel (courteous, Professional And Knowledgeable) (20) Iv Response To Complaints (20) V Compliance With Set Office Policies For Such Services (10) Performance Rating Passing Rate: 80 Points B.the Msd Chief Shall Conduct A Periodic Review Using The Above-cited Criteria To Ensure Compliance With The Technical Specifications, As Well As With The Other Terms And Conditions Imposed By The Denr Isabela During The Contract Period. C.further, The Msd Chief Shall Conduct A Mid-term Assessment Or Evaluation Of The Contractor. Based On Its Assessment, The Denr Isabela May Pre-terminate The Contract For Failure Of The Contractor To Perform Its Obligations Thereon Following The Procedures Prescribed Under The Guidelines On Termination Of Contracts Issued By The Government Procurement Policy Board Under Annex “i” Of The Revised Irr Of Ra 9184. Cy2025 Security Services Proposed Deployment Schedule Name Of Office # Hours # Guard Tour Of Duty Penro Isabela Osmeña, City Of Ilagan, Isabela 12 Hrs 2 Mon-sun (6am-6pm; 6pm-6am) Cenro Cabagan Cansan, Cabagan, Isabela 12 Hrs 1 Wed-sun (6pm-6am) Cenro Cauayan Sillawit, Cauayan City, Isabela 12 Hrs 1 Wed-sun (6pm-6am) Cenro Naguilian San Manuel, Naguilian, Isabela 12 Hrs 1 Wed-sun (6pm-6am) Cenro Palanan Dicabisagan West, Palanan Isabela 12 Hrs 1 Wed-sun (6pm-6am) Cenro San Isidro Ramos East, San Isidro, Isabela 12 Hrs 1 Wed-sun (6pm-6am) Total - - - - 7 Note: Schedule Of Tour Of Duty May Change During The Contract Implementation Or Upon The Instruction Of The Head Of The Agency Or Its Authorized Representative. Prepared By: Recommending Approval: Miguel L. Vasquez Luz S. Soriano Supply Officer I Chief, Management Services Division Approved By: Orly T. Cariazo Penr Officer Bidder’s Undertaking I/we, The Undersigned Bidder, Having Examined The Bidding Documents Including Bid Bulletins, As Applicable, Hereby Bid To (supply/deliver/perform/comply) The Above Terms Of Reference I/we Undertake, If Our Bid Is Accepted, To Deliver The Goods/services In Accordance With The Terms And Conditions Contained In The Bid Documents, Including The Posting Of The Required Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award. Until A Formal Contract/order Confirmation Is Prepared And Signed, This Bid Is Binding On Us. ____________________________________________________________ Name Of Company (in Print) ________________________________________ Signature Of Company Authorized Representative ___________________________________________________ Name & Designation (in Print) __________________________________ Section Vii. Technical Specifications Technical Specifications Item Specification Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] Technical Specifications Instruction To Bidders: Please Fill Up The Form Accordingly And Sign The Bidder’s Undertaking. Failure To Conform Will Result In A Rating Of “failed”. Project Requirements Bidder’s Statement Of Compliance Procurement Of One (1)-year Security Services For The Department Of Environment And Natural Resources (denr-isabela) Provincial And Community Field Offices For Cy 2025 I Hereby Certify To Comply With The Above Technical Specifications. ____________________________________________________________ Name Of Company (in Print) ________________________________________ Signature Of Company Authorized Representative ___________________________________________________ Name & Designation (in Print) Section Viii. Checklist Of Technical And Financial Documents Checklist Of Technical And Financial Documents I.technical Component Envelope Class “a” Documents Legal Documents ⬜ (a)valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents ⬜ (b)statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c)statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ (d)original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And ⬜ (e)conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And ⬜ (f)original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (g)the Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents ⬜ (h)if Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii.financial Component Envelope ⬜ (i)original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (j)original Of Duly Signed And Accomplished Price Schedule(s). Other Documentary Requirements Under Ra No. 9184 (as Applicable) ⬜ (k)[for Foreign Bidders Claiming By Reason Of Their Country’s Extension Of Reciprocal Rights To Filipinos] Certification From The Relevant Government Office Of Their Country Stating That Filipinos Are Allowed To Participate In Government Procurement Activities For The Same Item Or Product. ⬜ (l)certification From The Dti If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity. Section Ix. Detailed Financial Breakdown Annex I Seven (7) Security Guards For Denr Penro Isabela, Cenro Cabagan, Cenro Cauayan, Cenro Naguilian, Cenro Palanan And Cenro San Isidro No. Of Days/ Year: 394.40 Particulars Shifting/work Schedule (12 Hours Per Shift) I. Amount To Guard (php) Ave. Pay/month (dw * No. Of Days/year / 12) Night Differential (ave. Pay / Month X 10%) Uniform Allowance (r.a. 5487) Overtime Pay 5 Days Incentive Pay (dw * 5 / 12) 13th Month Pay (dw * 365 / 12 / 12) Subtotal I Ii. Amount To Government (php) Retirement Benefit (r.a. 7641) (dw * 22.5 / 12) Sss (employer's Share) (msc * 9.5%) Sss Provident Fund Philhealth (mbs * 5% / 2) State Insurance Pag-ibig Subtotal Ii Iii. Total Amount To Guard And Government (php) = (i + Ii) Iv. Agency Fee (php) (standard Administrative Fee: Minimum Of 20%) V. Value Added Tax (php) = (iv X 12%) Vi. Minimum Rate Per Guard (php) = (iii + Iv + V) Vii. Minimum Monthly Contract Rate (php) = (vi X No. Of Guards) Viii. Annual Bill Rate (php) = (vii X 12 Months) Note: Rounding Off Of Digits Applies Only To The Centavo Part Which Is Nearest To The Hundredths Place (two Decimal Places). _____________________ Name Of Company (in Print) ______________________________________ Signature Of Company Authorized Representative _______________________________________________ Name And Designation (in Print) _____________________________ Date
Closing Soon28 Nov 2024
Tender AmountPHP 3.2 Million (USD 55 K)

Department Of Education Division Of Tangub City Tender

Others
Philippines
Details: Description 1. The Department Of Education – Division Of Tangub City, Through The General Appropriations Act 2024 Intends To Apply The Sum Of Three Million Nine Hundred Seventy-eight Thousand One Hundred Six Pesos (php 3,978,106.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Procurement Of Learning Tools And Equipment For Technical Vocational Livelihood To Deped-public Schools With Identification Number Tvl - 2024 – Rx – Tangub City – 030. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Quantity Unit Item Description Abc Lot 1. Lorenzo Tan National High School (caregiving Nc Ii)- Php 400,403.00 5 Piece Airpot 1.type: Water Heater 2. Outer Material: Hard Plastic, (pp) Polypropylene, Heat Resistant 3.cavity Material: Stainless Steel 4. Capacity: 2.5 Liters 5.voltage: 220/240/volts 6.ac 50/60 Hz. Power In Watts: 500 To 800 Watts 7.comes With English Manual That Contains: Users Guide, List Of Parts, Maintenance Guide, Safety Guide 8. The Item Must Be Branded And Good Quality. 10 Piece Apron 1.type: Bib Apron 2. Material: Polyester-cotton Fabric 3.length: 20 To 40 Inches (minimum) 4. With 2 To 3 Bottom Pockets; 5.color: Any 6.the Item Must Be Of Good Quality 2 Piece Bath Tub, Baby 1. Material: Hard/sturdy Plastic, (pp) Polypropylene 2. Color: Any 3.dimension: (l X W X H) 670 To 700 Mm X 400 To 420 Mm X 160 To 190 Mm (minimum) 4. Thickness: 3 Mm To 6 Mm (minimum) 5.color: The Item Must Be Of Good Quality 10 Piece Baby Blanket 1. Type: Blanket 2. Material: 100% Cotton 3.color: White 4. Dimension: (l Xw) 38 To 42 Inches X 28 To 32 Inches (minimum) 5. Washable 6. The Item Must Be Of Good Quality 20 Piece Basin (small) 1.material: Hard Plastic, (pp) Polypropylene 2. Color: Any 3.dimension: 280 - 320 Mm Diameter X 80 - 120 Mm Higher (mimimum) 4. Thickness: 2 Mm To 4 Mm (minimum) 5. The Item Must Be Of Good Quality 20 Piece Bath-towel, Towellete 1. Type: Bath Towel 2. Material: 100% Cotton 3.color: White 4. Dimension: ( L X W ) 120 - 125 Cm X 60 - 65 Cm (minimum) 5.washable 6.the Item Must Be Of Good Quality 5 Piece Bedpan 1.material: Hard Plastic, (ps) Polystyrene 2. Color: Any Color 3.dimension: ( L X W X H) 22 - 26 Cm X 27 - 32 Cm X 7 - 12 Cm (minimum) Approximate 4. Capacity: 1 Liter (minimum) 5.thickness: 2 To 5 Mm 6.saddle-shaped And Lightweight 7. The Item Must Be Of Good Quality 10 Piece Blanket 1. Type: Blanket 2. Material: Cotton 3.color: White 4. Dimension: (l X W) 80 - 90 Inches X 54 -64 Inches Approximate 5. Washable 6. The Item Must Be Of Good Quality 3 Piece Bottle Sterilizer, Electric 1. Type: Electric Steam Sterilizer 2. Material: Hard Plastic (p E) Polyethylene Or Its Equavalent 3.color: Any Color 4. Capacity: 6 Bottles (minimum) 5.sterilizes Bottle And Accessories By Steam 6. With Automatic Power Shut-off Function 7. Dimensions: 8. Power Supply: 220 V-240v Ac, 50/60 Hz. 9. The Item Must Be Of Good Quality 5 Piece Bread Toaster 1. Type: Electric Bread Toaster 2. Dimensions ( W X D X H): 25 - 30 Cm X 15 -20 Cm X 18 - 22 Cm (minimum) Approximate 3. Capacity: 2 Slices 4. Power Supply: 220v-240v Ac, 50/60 Hz. 5. 400 To 600 W (minimum) 6. The Item Must Be Of Good Quality 10 Piece Burping Cloth 1. Type: Burping Cloth 2. Material: 100% Cotton 3. Color: Any Color 4. Dimension: Length: 17 -19 Cm Width: 14 -16 Cm (minimum) 5.washable 6. The Item Must Be Of Good Quality 10 Piece Cane 1.type: Adjustable Offset-walking Cane 2. Material: Aluminum 3.tip Size: 18 4. Height Adjustment: 31 Inches To 39 Inches (with 1 Inch. Increment) 5.weight Capacity: 200 - 250 Lbs. (minimum) 6.with Rubber Handle; With Push-botton Height Adjustment 7. The Item Must Be Of Good Quality 5 Piece Carpet 4ft. X 8 Ft 1.material: Polyster 2. Color: Any Patterned Color 3.dimension:48 Inches X 96 Inches (minimum) 4.the Item Must Be Of Good Quality 5 Set China Ware 1.material: Porcelain 2. Fit To Be Used In Ovens And Microwaves 3.specific Dimensions: Dinner Plate Diameter: 10 Inches (minimum) 4. Salad Plate Diameter: 7 Inches (minimum) 5.bowl Diameter: 5 Inches (minimum) 6.mug: 12 Oz. (minimum) 7. The Item Must Be Of Good Quality 8. Set Includes: 1 Piece Dinner Plate, 1 Set Salad Plate, 1 Piece Bowl, 1 Piece Mug 10 Piece Clothes Brush 1. Type: Rectangular Clothes Brush 2. Handle Material: Wood 3. Bristle Material: Plastic Bristle 4. Color: Any Color 5.overall Dimension: ( L X W X H) 140 -160 Mm X 45- 60 Mm X 20 -30 Mm (minimum) 6. The Item Must Be Of Good Quality 10 Piece Clothes Hamper 1. Type: Square Hamper 2. Material: Polyester 3. Color: Any Color 5. Dimension: ( L X W X H) 32 To 34 Cm X 36 To 38 Cm X 56 To 58 Cm (minimum) 5. The Item Must Be Of Good Quality 2 Piece Clothes Rack 1.type: Single-pole Clothes Rack 2. Material: Stainless Steel 3. Dimension: ( L X W X H) 30 To 32 Inches X 14 To 38 Inches X 62 To 64 Inches (minimum) 4. Comes With 4 Caster Wheels 5. The Item Must Be Of Good Quality 3 Piece Comforter 1.type:comforter 2. Material: Polyester 3.color: Any Color 4. Dimension: ( L X W) 84 To 88 Inches X 62 To 65 Inches (minimum) 5.thickness: 20-30 Mm (minimum) 6.washable 7. The Item Must Be Of Good Quality 3 Piece Commode 1.type: Foldable Commode 2. Durable Plastic Snap- On Seat And Lid Withouot Pushing Buttons 3. Blue Powder-coated Steel-welded Construction 4. Plastic Arms For Added Comfort 5.comes Complete With 12 Qt. Commode Bucket With Carry Handle, Cover And Splash Shield 6. Specifications: Width 18 Inches Between Arms/ 22.5 Inches Outside Approximate 7. Set Dimensions: W 32 -36 Cm X D 35 -40 Cm, Height 38 -54 Cm Approximate 8. Weight 13 Lbs., Weitgh Limit 350 Lbs. 9. The Item Must Be Of Good Quality 5 Set Cooking Utensils 1. Material: Stainless Steel 2. The Set Is Comprised Of Ff:; 1 Pc. -16 X 9.5 Cm Sauce Pan With Glass Lid (minimum) 3. 1 Pc. - 16 X 95 Cm Casserole With One Glass Lid, (minimum) 4. 1 Pc. - 18 X 10.5 Cm Casserole With Glass Lid, (minimum) 5.1 Pc. - 20 X 11. 5 Cm Casserole With Glass Lid, (minimum) 6. The Item Must Be Of Good Quality 2 Piece Crutches, Adjustable 1.type: Adjustable Crutches 2. Set Includes: 3 Pcs./set 3.material: Aluminum Powder-coated 4. Color: Any Color 5.weight Capacity: 300 Lbs. (minimum) 6. Dimensions: Youth Size 7. User Heights: 4 Ft. 6 Inches To 5 Ft. 2 Inches 8. Underarm Height: 37 Inches To 46 Inches 9. Adult Size: User Heights: 5 Ft. 2 Inches To Ft. 10 Inches 10. Underam Heights: 45 Inches To 53 Inches 11. Tall Adult Size: User Heights: 5 To 10 Inches 12. Underam Height: 53 Inches To 61 Inches 13. The Item Must Be Of Good Quality 10 Piece Cutlery 1.material: Stainless Steel 2. 20 Pieces Set For 4 3. 4 Dinner Knives 4. 4 Dinner Forks 5. 4 Dinner Spoons 6. 4 Salad Forks 7. 4 Tea Spoons 8. The Item Must Be Of Good Quality 10 Piece Cutting Board, Plastic 1. Material: Polyethylene Plastic 2. Color: Any Color 3. Dimension: ( L X W X H) 240 - 260 Mm X 140 - 160 Mm X 10 - 15 Mm (minimum) 4. Reversible Cutting Surface 5. The Item Must Be Of Good Quality 10 Piece Digital Thermometer, 32 C-42.9 C (90.0f-109.9f 1. Case Material: Hard Plastic (pe) Polyethylene 2. Color: Any Color 3. Range: 32 C - 42.9 C (90.0f-109.9f) 4. Accuracy: + 0.1c 35.5c-42.0c(+ 0.2 F 95.9f-107.6f) 5. Battery Operated 6.memory: Last Measuring Reading 7.alarm: Approx. 10 Seconds Sound Signal When Peak Temperature Reached. 8. The Item Must Be Of Good Quality 2 Piece Dressing Trolley 1.material: Shelves: Powder-coated Steel Sheet 2. Dimensions: ( W X D X H) 48 - 50 Cm X 48 - 50 Cm X 83 - 85 Cm (minimum) 3.number Of Shelves: 2 4. With Four Revolving Castors, Two Lockable 5. The Item Must Be Of Good Quality 10 Piece Electric Knife 1. Type: Electric Knife 2. Material: Stainless Steel And Hard Plastic, (pe) Polyethylene 3. Power Supply: 220/240 Volts, Ac 50/60 Hz. 4. Dimensions: 4.25 X 2.75 X 11.88 Inches (minimum) 5.comes With Touch Button Control, Safety Lock And English User & 39;s Manual 6. Comes With English Manual That Contains: Users Guide, List Of Parts, Maintenance Guide, 7. The Item Must Be Of Good Quality 10 Piece Face Towel/towellete 1. Type: Face Towel 2. Material: 100% Cotton 3. Color: White 4. Dimension: ( L X W ) 28- 32 Cm X 28 -32 Cm (minimum) 5. Washable 6. The Item Must Be Of Good Quality 10 Piece Feeding Bottle Brush 1. Bristle Material: Nylon 2. Color: Any Color 3. Handle Material: Hard Plastic, (ps) Polystyrene 4. Total Length: 280 -320 Mm (minimum) 5. Fit With The Standard Feeding Bottle For The Baby 6.comes With Nipple Brush 7. Washable 8. The Item Must Be Of Good Quality 5 Set Feeding Utensils (child) 1.material: Hard Plastic, (ps) Polystyrene 2. Sets Includes: 6 Pcs./set 3. 1 Pc Knife 4. 1 Pc- Plate 5. 1 Pc. -bowl 6. 1 Pc. - Cup 7. 1 Pc. -fork 8.1 Pc. - Spoon 9. Color: Any 10. The Item Must Be Of Good Quality 7 Set First Aid Kit Type: Emergency Case; Contents: First Aid Quick Reference Guide, 1 Pc; Sterize Gauge Swab (4x 4 X 12 Ply) 100 Pcs/pack, 1 Pack; Adhesive Strips/band-aid, 50 Pcs/pack, 2 Packs; Gloves, Disposable, Medium Size, 2 Pairs; Hypo Allergenic Adhesive Tape, 5 Cm X 5 Cm, 2 Rolls; Triangular Bandage/arm Sling, Min 90 Cm X 90 Cm X 120 Cm, 2 Pcs; Safety Pins, 1 1/4 Inches, (12 Pcs), 1 3/4 Inches (12 Pcs); Stainless Steel Bandage Scissors, 2 Pcs; Betadine, 60ml, 2 -3 Years Expiration, 2 Bottles; Dust Mask, 2 Pcs; Hand Towels Or Face Towels, White Color, 6 Pcs; Gauze Bandage, Minimum 5 Cm X 4cm, 2 Rolls; Antiseptic Handwash/germicidal Soap, 60 Gms, 2 Pcs; Torniquet, 2 Pcs; Spirit Of Ammonia, 30ml, 2-3 Years Expiration, 1 Bottle; Burn Cream Ointment, 20g To 30g, 2-3 Years Expiration, 1 Tube; Medical Tweezers Min. 8 Cm, Plastic, 2 Pcs; Plastic Bags, Resealable, Minimum Of 24 Pcs, 100mm X 180mm, 24 Pcs, 150mm X 230mm; Cotton Balls, 50 Balls In A Sealed Package, 2 Packs; Hot And Cold Pack, Reusable, 1 Pack; Water Resistant And Sturdy Case W/ Handle That Can Accomodate All The Listed Items. 20 Piece Flat Sheet 1.type:bed Sheet 2. Material: 100% Cotton 3. Color: White 4. Dimension: Width - 137 - 145 Cm Length - 180 -200 Cm (minimum) 5. Washable 6. The Item Must Be Of Good Quality 10 Piece Garbage Bin Type: Swivel Lid Garbage Bin Body Shape: Round Material: Hard Plastic, Polypropylene Dimension: 4 Gallons ( Minimum) Removable Dome Shape Lid With Spring Return Swivel Preferably With Packing Case Color: Any Color Smooth And No Rough Surfaces 20 Box Gloves, Rubber (15 Mils) Medium Size (#8) Super Nitrile, Flocklined Interior (acid/solvent Resistant) Individually Packed For Hand Protection 10 Box Gloves, Surgical (disposable) 1.material: Latex 2. Color: White 3. Thickness: .09 Mm (minimum) 4. Disposable And Sterile 5. The Item Must Be Of Good Quality 20 Piece Gown (hospital) 1.type:unisex Hospital Gown 2. Material: Polyester- Cotton 3. Color: Any Color 4. Size: One Size Fits All 5. Comes With Overlap Back Closure 6. The Item Must Be Of Good Quality 5 Set Grooming Kit (hairbrush Comb, Nail Cutter, Nail Brush) 1. Set Includes: 6 Pcs./ Set (minimum) 2. Materials: Stainless Steel And Hard Plastic 3. 2 Nail Clippers/ Trimmers Of Different Sizes 4.1 Multipurpose Scissors 5. 1 Ear Pick 6. 1 Tweezer 7. 1 Comb 8. The Item Must Be Of Good Quality 10 Piece Hand Towel 1. Type: Hand Towel 2. Material: 100% Cotton 3. Color: Any Color 4. Dimension: ( L X W) 65 -75 Cm X 32 -42 Cm (minimum) 5. Washable 6. The Item Must Be Of Good Quality 3 Piece High Chair/booster Seat/ Portable Seat 1. Material: Foldable Powder Coated Steel Frame Or Its Equavalent 2. Phone Type: Corded 3. Polyester Harness, Seat/back Cushion 4. Overall Dimensions: ( L X W) 65 -75 Cm X 50 -60 Cm X 90 - 102 Cm (minimum) 5. Capacity: 40 Lbs. (minimum) 6. With 3-position Seat Recline 7. The Item Must Be Of Good Quality 10 Piece Hot Water Bag 1. Material: Rubber Or Its Equavalent 2. Color: Any Color 3. Overall Dimension: (lxw) 200- 300 Mm X 150 -200 Mm (minimum) 4. Leak-proof And Washable 5. The Item Must Be Of Good Quality 10 Piece Kettle 1. Material: Heat-resistant Hard Plastic 2. Capacity: 1- 1.5 Liters (minimum) 3. Height: 25-35 Cm (minimum) Approx 4. Voltage: 220/240 Volts, Ac 50/60 Hz 5. Power In Watts: 1000 To 1500 Watts 6.comes With Automatic Shut-off Feature And Permanent Water Level Indicator 7. Pitcher-type With Pouring. 8. Comes With English Manual That Contains: Users Guide, List Of Parts, Maintenance Guide, 9. The Item Must Be Of Good Quality 10 Set Measuring Cups .. 1/4, 13, 1/2 1 Cup Set 1. Materials: Stainless Steel 2. Set Includes: 4 Pcs./set; 3. 1 Pc. - 1/4 Cup (60 Ml) 4. 1 Pc- -1/3 Cup (80ml) 5. 1 Pc.- 1/2 Cup (125 Ml) 6. 1 Pc. - 1 Cup ( 250 Ml) 7. Thickness: .5 Mm To 1 Mm (minimum) 8. The Item Must Be Of Good Quality 10 Piece Medical Tray 1. Type: Tray 2. Material: Stainless Steel 3. Overall Dimension: (lxw X D) 300- 350 Mm X 200 -250 Mm X 12 - 19 Mm (minimum) 4. Thickness: .7 To 1 Mm (minimum) 5. The Item Must Be Of Good Quality 2 Set Mixing Bowl, Stainless, 6-piece Set 1. Material: Stainless Steel 2. Quantity Of Set: 6 Pcs./set 3. Dimension: 3/4 Qt., 1.5 Qt., 3 Qt., 4 Qt., 5 Qt., 8 Qt., 4. The Item Must Be Of Good Quality 10 Piece Pail, Plastic, 10 Liters 1. Material: Polyethylene Plastic 2. Dimension: 25-30 Cm Diameter X 23-27 Cm Depth (minimum) 3. Color: Any Color 4. Chromed Finished Handle 5. Capacity: 10 Liters (minimum) 6. Material Must Be Non-toxic 7. The Item Must Be Of Good Quality 10 Piece Pans 1. Type: Frying Pan 2. Material: Stainless Steel 3. Handle: With Hard Plastic Heat Insulation 4. Tempered Glass Lid With Steam Hole 5. Size 23 -26 Cm With Lid 6. The Item Must Be Of Good Quality 10 Piece Peeler 1. Type: Peeler 2. Blade Material: Stainless Steel 3. Handle Material: Stainless Steel 4. Overall Dimensions: 18 X 8 Cm (minimum) 5. Comes With Self-locking 6. The Item Must Be Of Good Quality 10 Piece Pick Up Forcep 1. Type: Curved Forceps 2. Material: Stainless Steel 3. Overall Length: 100-130 Mm (minimum) 4. Comes With Self-locking 5. The Item Must Be Of Good Quality 10 Piece Pillow 1. Material: Cotton 2. Color: Any Color 3. Dimensions: ( L X W) 50 - 56 Cm X 75 - 180 Cm (minimum) 4. With 4 Inches Hems 5. Washable 6. The Item Must Be Of Good Quality 20 Piece Pillow Case 1. Material: Cotton 2. Color: Any Color 3. Dimensions: ( L X W) 50 - 56 Cm X 75 - 180 Cm (minimum) 4. With 4 Inches Hems 5. Washable 6. The Item Must Be Of Good Quality 10 Piece Portable Mixer 1. Type: Portable Mixer 2. Material: Stainless Steel, Clear Acrylic 3. Capacity: 16-18 Oz. (minimum) 4. Size: 170 - 220 Mm X 75- 100 Mm 5. Requires 2 Aaa Batteries 6. Power In Watts: 250 To 300 Watts 7. The Item Must Be Of Good Quality 10 Piece Potato Masher 1. Type: Portable Masher 2. Material: Stainless Steel And Hard Plastic 3. Mesh Head Diameter: 70-90 Mm (minimum) 4. Overall Length: 250 - 270 Mm (minimum) 5. Handle Length: 120-140 Mm (minimum) 6. Washable 7. The Item Must Be Of Good Quality 5 Set Pots 1. Type: Cooking Pot 2. Material: Stainless Steel 3. Set Includes: 4 Pcs./set 4. 1 X Pot With Lid 5. 1 X Pan With Lid 6. 1 X Strainer 7. 1 X Egg Streamer 8. Size: (l X W X H) 40 To 42 Cm X 12 To 14 Cm X 26 To 28 Cm 9. The Item Must Be Of Good Quality 5 Piece Skillet 1. The Item Shall Have The Following Specifications. Material Including Handle: Cast Iron 2. Color: Any Color 3. Dimension ( Dia. X Depth): 250 - 320 Mm X 50 - 70 Mm (minimum) 4. Handle Casted With The Body And Having Plastic Or Rubber Heat Insulator 5. Body Thickness: 1.5 - 3 Mm (minimum) 6. Washable 7. The Item Must Be Branded And Have Good Quality. 5 Piece Sphygmomanometer 1. Type: Aneroid 2. Material: Nylon Cuff And Inflation Bag, Die - Cast Zinc Manometer 3. Package Inlcluded: 1 X Aneroid Sphygmomanometer. 4. Size: ( L X W X H Cm) = 18 To 20 Cm X 11 To 13 Cm X 11 13 Cm 5. Nylon Zippered Carrying Case 6. Capacity: 0 To 300 Mm Hg 7. The Item Must Have Good Quality. 5 Piece Stethoscope 1. Type: Dual Head Stethoscope 2. Material: Stainless Steel Chestpiece And Eartubes 3. Reinforced Pvc Tubing 4. Soft Pvc Eartips 5. Color: Any Color 6. Bell Diameter: 18-25 Mm Approx. 7. Diaphragm Diameter: 25-50 Mm Approx. 8. Overall Length: 66-75 Cm (minimum) 9. The Item Must Be Of Good Quality 5 Piece Urinal 1. Type: Unisex Portable Urinal 2. Material: Hard Plastic, (pp) Polypropylene 3. Color: Any Color 4. Total Capacity: 28 Oz. Minimum 5. Dimension: ( L X W X H) 270 To 290 Mm X 145 To 160 Mm X 70 To 80 Mm ( Minimum) 6. Thickness: 1 Mm To 3 Mm (minimum) 7. The Item Must Have Good Quality. 5 Piece Vacuum Cleaner 1. Material: Plastic (pp) Polypropylene Or Its Equavalent 2. Color: Any Color 3. Suction Power: 18 To 22 Kpa (minimum) 4. Tank Capacity: 24 Liters (minimum) 5. Vacuum Hose Length: 6 To 8 Ft. (minimum) 6. Power Supply: 220 V - 240 Ac , 50/60 Hz. 7. With Accesories: Extension Wand, Utility Nozzle, Standard Paper Filter 8. Comes With English Manual That Contains: Users Guide, List Of Parts, Maintenance Guide, Safety Guide 9. The Item Must Be Branded And Good Quality 3 Piece Wheel Chair 1. Type: Foldable Wheel Chair 2. Overall Dimensions: ( L X W X H) 40 - 44 Inches X 26 - 30 Inches X 34 - 38 Inches ( Minimum) 3. Folded Dimensions: ( L X W X H ) 40 To 44 Inches X 10 To 14 Inches X 34 To 38 Inches (minimum) 4. Capacity: 350 Lbs. (minimum) 5. With Padded Arm Rests; With Push-to-lock Wheel Brakes 6. The Item Must Be Of Good Quality Lot 2. Sta. Maria National High School (hairdressing Nc Ii)- Php 323,170.00 5 Pcs. Bowl, Mixing, Plastic With 10.5 Cm X 6cm 2 Pcs. Bowl, Shampoo, Stainless Steel Frame, Bowl Dimensions: 19 Inch X 20 Inch X 10 Inch With Hose Attachment Of 7 Ft. 5 Box Box, Hairpin, Metal With 3.5 X 4.5 X 0.5 Inches(100 Pcs Per Box) 5 Pcs. Brush, Applicator, Plastic With 70mm X 80mm 5 Pcs. Brush, Hair, Plastic Bristle And Wooden Handle, Width - 2 Inches 10 Pcs. Cap, Frosting, With Hook, Silicone With 31cm X 22cm,rounded Metal Hook 10 Pcs. Cap, Heating, Waterproof, Cordless With 21-24 Inches 10 Pcs. Cape, Polyester With 125 Cm X 140 Cm 5 Pcs. Chair,high, Metal Painted With Anti Rust With 15 Inches X 33 Inches, Synthetic Leather Seat 5 Pcs. Chair, Hydraulic, Metal Base With 59 Cm X 54 Cm X 51-78cm, 180kg, 360' Rotation 10 Pcs. Clamp, Plastic, Length:9.5cm, Thickness:10mm 10 Pcs. Clamp, Duck Bill, Metal, Length: 11 Cm, Elasticity Stainless Steel Spring 5 Pcs. Clipper, Hair, Body Material: Hard Plastic, Blade Material: Carbon Steel, 6 Watts 10 Pcs. Comb, Afro, Plastic, Length: 7 Inches, Width: 3.25 Inches, Number Of Teeth: 12 Teeth, Teeth Height: 2.5 Inches 10 Pcs. Comb, All Purpose, Plastic, 18 Cm Long , Has Both Fine And Medium Teeth Position On One Side Only, Height Of The Teeth: 2 Cm 10 Pcs. Comb, Haircutting, Hard Plastic, Length Including The Handle:180mm, Width: 30mm With Detachable Steel Blades And Blade Holder 10 Pcs. Comb, Large Toothed, Plastic, Size:15 Cm, Number Of Teeth: 10 Teeth, Gap Between Comb's Teeth: 0.4 To 0.5 Cm , Teeth Size: 0.3 Cm X 4cm 10 Pcs. Comb, Tail, Plastic, Size : 8 Inches X 1 Inches, Tail Length: 4 Inches Tooth Length: 3/4 Inch 10 Pcs. Comb, Teasing, Plastic,1st Row: Large Teeth 25 Mm Long, 2nd Row: Small Teeth 19 Mm, Over-all Size: 20cm X 3.8 Cm 5 Pcs. Comb, Wide Tooth, Plastic, Size:15 Cm, Number Of Teeth:10 Teeth, Gap Between Comb's Teeth:0.4 To 0.5 Cm, Teeth Size: 0.3cm X 4cm 8 Pcs. Crimpers, 25 Watts, Size:38 Cm X 15.5 Cm X 9 Cm, Maximum Temp.: 200 Degrees Centigrade, Rated Voltage:10 -230volts Ac 5 Pcs. Curling Iron, Ceramic, 65watts, 210-240volts Ac, Barrel Size: 1 Inch, Adjustable Heat Setting Of 200 Degrees Centigrade, Swivel Cord Up To 360 Degree 5 Pcs. Drip Pan, Hard Plastic, Size:17.5 X 25.8 X 1 Inches, Thickness: 1/8 Inch, Shallow Rectangular Type 5 Pcs. Dryer, Hair, 1000w, Rated Voltage: 220vac, 18.5cm X 16cm X 6.5cm With Plastic Handle Design 10 Box Gloves, Disposable, Size: 25cm X 23cm, 100 Pcs Per Box 5 Pouch Gloves, Rubber, Medium, Thickness: 4 Mil, Acid Resistant 5 Pouch Gown, Smock, Polyester, Sizes: Small (50inches X 56inches);medium (52inches X 58inches); Large (54 Inches X 60inches) 10 Pouch Hairclips, Metal, Size:67mm X 19mm 10 Pack Hairnet, Invisible, Nylon, Size: 55mm, Stretchable, Color: Black 10 Pc Headband, 6 Inches, Woven Crochet Tube 10 Pc Headband, Flannel, Cloth, Size : 45 Cm, Width: 8 Cm 6 Pc Infrared Iron, Ionic Ceramic Tourmaline-infused Plates And Abs Plastic Body, Power: 70 Watts, Power Rating: 220-240 Volts Ac; Over-all Size: 24 Cm, Heating Plate 50 Mm, Heating Time: Within 30 Seconds;variable Heat Settings: From 250 To 450 Degrees Fahrenheit 10 Pc Mirror, Hand, Plastic, Size 15 Cm Diameter, Frame Thickness: 6.5mm, Over-all Length With The Handle: 20 Cm 3 Pc Mirror, Modular, Plain Mirror, Mirror Material: Glass, Frame Material: Aluminum (cut To Fit), Dimensions: 75 Cm X 65 Cm, Mirror Thickness: 6mm 10 Pc Prong Clip, Double, Steel, Size: 45 Mm 10 Pc Prong Clip, Single,steel, Size: 55 Mm 10 Pc Razor, Straight, High Carbon Steel, Foldable Straight Razor, Replaceable Blade; Dimensions: 14 Cm X 2 Cm When Folded; Double-edged Razor Blades 3 Dz Roller Pins, Metal, Size: 60mm Long, Quantity By Dozen(12 Pieces) 10 Pc Rollers, Jumbo, Plastic 44mm In Diameter X 64mm 10 Pc Rollers, Large Sized, Plastic, Size: 40mm Diameter X 60mm Long 10 Pc Rollers, Medium Sized, Plastic; Diameter: 38 Mm ,length: 58mm 4 Pc Scissor, Cutting, Stainless Steel,length: 17cm,blade Width 10 Cm 4 Pc Scissor, Thinning, High Carbon Steel, Blade Length 6cm, Style: Right Handed Scissor, Length: 17cm 5 Pc Scoop, Plastic, Capacity:1/2 Cup, Rounded Edges With Handle Thickness: 1.5 Mm 5 Pc Shower Cap, Plastic, Size: One Size Fits All Or 30cm 5 Pc Spatula, Plastic, Dimension: 7.5 Cm X 1.5 Cm 5 Pc Spray Gun, Transparent Plastic, Capacity: 300ml, Dimension: Bottom Is 7 Cm And The Height Is 17cm 3 Pc Steamer, Hair, 450 Watts, 220 Volts/50-60hz, Hood Material: Polycarbonate, Hood 30 Cm Diameter Opening X 25 Cm, Timer Setting Is Up To 60 Minutes, 32 Ounce Water Reservoir, Adjustable Height 100- 150cm 30 Pcs. Stool, Metal, Electroplated, Load Capacity: 150kg, Design: Swivel Stool With Backrest With Hydraulic Lift To Adjust Height Freely Lot 3. Sta. Maria National High School (wellness Massage Nc Ii)-php 198,338.00 5 Pcs. Dummy, Anatomical, Plastic, 32" Tall, 27 Removable Parts That Are Held On By Metal Screws, Posts, And Hooks, Brain (2parts), Lungs (2 Parts), Heart (2 Parts, Liver, Intestines, Stomach, Base Is 13" X 9" (removable), Weighs 12 Lbs. 5 Pcs. Massage Bed/table, Hard Wood With Steel Bracings, Hardwood Frame, Marine, Plywood Deck; Color: Black, Dimensions: W:75 Cm X L:183 Cm X H: (adjustable) Height: Adjustable From 24 In. - 33in., Leg Thickness - 35mm, Cushion System: High Density Foam (7.5 Cm / 2.95") With Pu Leather Cover (1mm Thick), Weight Capacity: 250 Kg(minimum), Gross Weight: 21 Kg 2 Pcs. Massage Chair, Padded With 3" Thick, High-density, Small-cell Foam, Size: 14"-diameter Seat But Without Back And Arm Rest, With Metal Post And Hard Plastic Star, Pneumatic Spring Will Effortlessly Adjust The Height From 18" To 24" With The Pull Of A Lever, Five Heavy-duty, Smooth-rolling Wheels, Load Capacity: 265 Lbs / 120 Kg (maximum), Smooth Surface And No Sharp Edges 6 Pcs. Sphygmomanometer, 33 To 42 Cm Arm Diameters, Accuracy: ±3mm Hg;measurement Range : 0mm Hg To 300mm Hg; Smallest Scale: 1mm Hg Index And Range Markings On The Dial For Clear Readings, Nylon Cuff Is Durable And Stain Resistant With A Velcro Closure 6 Pcs. Stethoscope, Stainless Steel Double Chest Piece, Color: Black, Tubing Description: Y-tube Pvc, Uses Extra Soft Replaceable And Pivotable Ear Tips, The Binaural Is Chromium-plated, Chest-piece Diameter: 44 Mm And Non-chill Rim, Overall Length: 29" /74 Cm 6 Pcs. Talking Sphygmomanometer, Nylon Cuff Sizes: 33 To 42 Cm Arm Dia, Dimensions: 98mm*126mm*60mm, Measurement Range : 0mm Hg To 300mm Hg; Smallest Scale: 1mm Hg, Weight: 450g , Range: 20~280mmhg(0.4kpa-37.3kpa), Pressure Accuracy: ±3mmhg(±0.4kpa), Pulse Measurement Range: 40 ~199 Beats /min, Voltage: 4*aaa Alkaline Batteries 25 Pcs. Talking Thermometer, Hard Plastic, Sensing Unit: Thermistor, Measurement Range: 32 C - 42 C (89.6f-107.6f), Measurement Accuracy: ± 0.1c 32c-42.0c (± 0.2 F 89.6.9f-107.6f), Power Supply: 1.5v Dc, Lr41 Alkaline-magnesium Button Battery Real Voice, Temperature Display: 3-digit, +deg C (deg F) Display In 0.1 Degree Increment, Dimension Approx.: 2.0 (w) X 4.4 (h) X 1.2 (d) Inches / 51 (w) X 110 (h) X 30 (d) Mms 26 Pcs. Thermometer, Digital, Hard Plastic, Sensing Unit: Thermistor, Measurement Range: 32 C - 42 C (89.6f-107.6f), Measurement Accuracy: ± 0.1c 32c-42.0c (± 0.2 F 89.6.9f-107.6f) Power Supply: 1.5v Dc, 1 Lr41 Alkaline-magnesium Button Battery , Power Consumption: 0.1mw, Temperature Display: 3-digit, +deg C (deg F) Display In 0.1 Degree Increment, External Size (mm): 19.4(w) × 132.5 (l) × 10.0(d) 10 Pcs. White Board, White Formica Laminated, Board Size: Rectangular 1800mm W X 1000 To 1200mm H, Board Edges Secured With Aluminum Clip Edging 17 Mm Wih Plastic Corner Caps, The Stand And Frame Are Constructed With Aluminum Or Powder Coated Steel 25mm Square Tube , Sturdy, No Wobble With 4 Lockable Hard Plastic Caster Wheels, Height From Floor: 210 To 214cm Lot 4. Sumirap National High School And Tangub City National High School (bpp Nc Ii)-php 519,702.00 10 Set Air Compressor With Airbrush Cake Decorating Set(airbrush Gravity Feed Dual Action Airbrush Compressor Kit 0.2/0.3/0.5mm Needle Air Brush For Cake Decorating Painting. Material: Aluminum + Copper Type: Single Cylinder Piston Compressor Power: 1/5 Hp Plug Type: Eu Voltage: 220-240v/50hz Speed: 1450 Rpm Air Volume Per Minute/liter: 23l/min Maximum Pressure: 7bar (100psi) Working Pressure Of Spray Gun: 15-50psi Low Noise: ≤50db Accessories: Pressure Gauge, Pressure Gauge, Air Filter Automatic Stop, Starts At 2.8 Bar, Stops At 4 Bar (special Pressures Available) Connection: With Connection G 1/8" Bsp Cable: Approx. 1.8m / 6ft) 40 Pc Egg Beater(stainless Steel Semi-automatic Mixer/manual Whisk Egg Beater Kitchen Cooking Tool) 40 Set Board, Chopping ,6 Color( Type: Food Grade Body Shape: Rectangular Material: Plastic (polypropylene), Food Grade Board Size: Length: 38 Cm (minimum) Width: 30 Cm (minimum) Thickness: 1.27 Cm (minimum) Color-coded For Use With Different Types Of Food, Blue, Red, Yellow, Green, Brown And White, Preferably Packed In Set Comes With No Sharp Edges And With Hole For Storage Purposes) 10 Pc Double Boiler (material: Stainless Steel Thickness: 1/16 Inch (1.5 Mm) (minimum) Lid Material: Glass Rivetedhandle On Both Side Diameter: 9 1/2 Inches (minimum) Total Height: 9.4 Inches (minimum) Inset Bottom Diameter: 9 Inches (minimum) Inset Top Diameter: 9 Inches (minimum) Capacity: 2 Liters (minimum) Must Be A Set Which Includes One (1) Saucepan, One (1) Boiler, And One (1) Lid With Stainless Steel Handle And Smooth Surfaces With No Sharp Edges) 80 Set Bowl, Mixing Set Stainless (premium Stainless Steel Mixing Bowls Bowl Sizes Are: 5 Qt, 4 Qt, 3qt, 1.5qt, And ¾ Qt And They Each Fit Perfectly Within One Another) 70 Set Cake Pan, Round, Size: 4''x3'' (non-stick Aluminum Alloy Cake Round Pan) 30 Set Cake Stand, With Tier (type: Cake Stand With Tier, Food Grade Body Shape: Circular With 3 Tier Material: Hard Plastic, Polypropylene, 4 Mm Thick The Tier Consists Of The Following Sizes: Tier 1: 18 Cm Diameter (minimum) Tier 2: 25 Cm Diameter (minimum) Tier 3 : 30 Cm Diameter (minimum) Column Diameter: 20 To 30 Mm (solid) Distance Between Tiers: 15 Cm Over-all Length: 30 Cm (minimum) Assembled Column Is Used For Maximum Strength And Stability Of The Stand Must Be Packed In Set ) 60 Pc Cake Turn Table (type: Turn Table Body Shape : Circular Material: Cast Aluminum Plate.and Cast Iron Base Upper Plate: 30 Cm Diameter (minimum) And 1.4 Cm Thickness (minimum) Base Dimensions: 18 Cm (minimum); 1.4 Cm Thickness (minimum) Total Height: 10 Cm To 15 Cm Turntable With Ball Bearing To Turn Easier Preferably Packed In Any Kind Of Packaging Comes With No Sharp Edges To Rotate Smoothly In 360 Degrees Clockwise Or Counter Clockwise ) 30 Pc Coupler (type: Foood Grade Body Shape: Tubular Material: Hard Plastic, Polypropylene, Any Bright Color Height: 3cm (minimum) Top Diameter: 1.27 Cm (minimum) Bottom Diameter: 2.54 Cm (minimum) Preferably With Storage Case The Materials Used Must Be Non-toxic And Dishwasher Safe ) 50 Set Cup, Measuring (stainless Steel Measuring Cup Set For Dry Ingredients. Composed Of 1 Cup, 3/4 Cup, 1/2 Cup, 1/4 Cup, 1/8 Cup) 50 Set Cup, Measuring 250 Ml. For Liquid Glass (250 Ml Heat Resisting Measuring Glass) 40 Set Cup, Measuring 500 Ml. For Liquid Glass (500ml Heat Resisting Measuring Glass) 40 Pc Cutter, Dough (type: Scrapper Body Shape: Straight Blade Material: Stainless Steel Straight Blade With Stainless Steel Handle Blade Dimension: Lenght : 15 Cm X Width: 11 Cm X Thickness: 1.2 Mm(minimum) Handle Dimension: Length: 15 Cm X Diameter: 3 Cm (minimum) Preferably With Packing Case Food Grade And Dishwasher Safe Design Allows Item To Be Hung For Storage) 40 Pc Cutter, Pie (stainless Steel Rolling Knife/pizza Cutter) 30 Pc Flour Sifter,hand Cranked (type: Hand Cranked Body Shape: Round Shape Material: Stainless Steel Dimension: Diameter: 133.3 Mm ( Minimum) X Height: 165 Mm (minimum) Thickness: 0.79 Mm (minimum) (body) And Constructed With Stainless Steel Wire Mesh # 30 Bottom Volume Markings Should Be Seen Inside And Outside Of The Sifter Capacity: 5 Cups (1.18 Liter) Spring Action Squeeze Handle Stainless Steel Preferably With A Packing Case Dishwasher Safe) 40 Pc Grater (type: Four Sided Box Grater Body Shape: Box In Shape Material: Stainless Steel Blade And Plastic (polypropylene Handle) Grater Dimensions: Height- 25 Cm X Width-13 Cm X Depth-10 Cm (minimum) Side 1: Large-hole Shredder With 6 Mm Hole Side 2: Slicer Side 3: Small-hole Shredder With 3 Mm Hole Side 4: Grater With Strips About 1.27 Cm To 2.54 Cm Length Preferably With Packing Case Food Grade & Dishwashing Safe) 50 Pc Knife, Kitchen (premium Quality Stainless Steel Kitchen Knife, 6-8” In Length) 20 Pc Knife, Pallete (premium Quality Stainless Steel Pallete Knife Ideal For Butter.) 50 Pc Ladle, 3oz (premium Quality Stainless Steel Soup Ladle, 3oz) 40 Pc Loaf Pan, Big (carbon Steel Non-stick Loaf Pan, Size: L=32,w=13,h=7cm Minimum) 40 Pc Loaf Pan, Medium (carbon Steel Non-stick Loaf Pan, Size: L=28, W=15.5, H=7cm Minimum) 40 Pc Loaf Pan, Small (carbon Steel Non-stick Loaf Pan, Size: L=25.5, W=13.5, H=6cm Minimum) 40 Pc Muffin Pan, Big (carbon Steel Non-stick Muffin Pan, 12 Holes,3oz) 40 Pc Muffin Pan, Medium (carbon Steel Non-stick Muffin Pan, 9 Holes,3oz) 40 Pc Muffin Pan, Small (carbon Steel Non-stick Cupcake Pan, 6 Holes) 70 Pc Pie Pan, 10'' (premium Stainless Steel/aluminum Pie Plate. Thick And Durable, 10” In Diameter) 70 Pc Pie Pan, # 8 (premium Stainless Steel/aluminum Pie Plate. Thick And Durable, 8” In Diameter) 50 Set Pillars, Cake (premium Quality Acrylic Cake Support Pillar, 12cm In Diameter(minimum),straw Size Diameter ) 60 Pack Piping Bag (reusable Silicone Piping Bag, Biggest Size, 100pcs Per Pack) 40 Pc Rectangular Pan (carbon Steel Non-stick Rectangular Cake Pan. Size: L=10.8", W=7", H=1.5", Minimum) 70 Pc Rolling Pin, Plastic (non-stick Rolling Pin Made With Food Grade Nylon, Size:13") 100 Pc Rubber Scraper, Silicone (size: 21cm X 4.1cm, Material: Silicone) 40 Pc Sauce Pan Non Stick (non-stick Sauce Pan With Lid, Size: 20cm) 40 Pc Sheet Pan / Cookie Sheet (aluminum Baking Sheet, Size: 13x18”) 50 Set Spoon, Measuring (premium Quality Stainless Steel Measuring Spoon Set, Compost Of 1/8tsp, 1/4tsp, 1/2tsp, 1tsp, 1/4tbsp, 1/2tbsp, 1tbsp)) 70 Pc Spoon,wooden (premium Quality And Durable Long Handled Wooden Spoon/ladle. Length: 30.5cm Minimum) 40 Pc Strainer (stainless Steel, Fine Mesh Strainer, Size: 18cm) 40 Set Tip, Decorating, Large (type: Tube Tips Body Shape: Nozzles With Different Shape Material: Stainless Steel Tube Height: 3.5 Cm To 5 Cm Tube Diameter: 2 Cm To 3.5 Cm Thickness: 0.5 Mm (minimum) Tube Tip: Assorted Designs (create Swirls, Rosettes, Flowers, Roping,stars, Leaves And Other Designs Comes With 24 Different Shapes Of Nozzles Packed In Plastic Storage Box Smooth And Deformities Free Must Be Branded) 30 Pc Weighing Scale, 10 Kg. (kitchen Weighing Scale, 10kg Maximum) 40 Pc Weighing Scale, 5 Kg. Digital(digital Kitchen Weighing Scale, Digital Price Computing Weight Electronic Scale, Capacity Is At Least 5kilograms, Pan Size 34.5 X 23.5cm) 70 Pc Wire Whisk, Medium (stainless Steel Wire Whisk, Size: 14”) Lot 5. Sumirap National High School And Tangub City National High School ( Cookery Nc Ii )-php 1,405,964.00 30 Pcs. Apple Corer, Body Shape: Tubular Material: Stainless Steel Total Length: 18 Cm (minimum) Handle Material: Hard Plastic, Polypropylene Handle Dimension: Length-10 Cm X Diameter-2 Cm (minimum) Blade Size: Length-8cm X Diameter-2 Cm (minimum) Preferably With Packing Case Dishwasher Safe. 4 Pcs. Bain Marie, Table, (food Warmer) Body Shape: Rectangular Material: 304 Stainless Steel, 0.8 Mm Thick (minimum) Dimensions: Length-1500 Mm X Width-700mm X Height-800 Mm (minimum) Power Soiuce: Voltage: 220 Volts - 230 Volts, 50 Hz/ 60 Hz With Royal Cord 1.5 Meter Long With Attachment Standard Type A Male Plug Or Provide Plug Adopter 10a/220v 20 Pcs. Blender, Electric Heavy Duty, Body Shape: Round Jar Material Housing: Plastic (polypropylene) Jar Height : 25 Cm To 28 Cm Jar Thickness: 4 Mm To 8 Mm Heat Resistant Glass Jar With Cover Source Voltage: 220 Volts / 240 Volts,50 Hz / 60 Hz With Power Cord 1.5 Meter Long With Attachment Of Standard Type A Male Plug Or Provide Plug Adopter 10a/220v. Power Wattage: 300 To 700 Watts Blade: Stainless Steel, 3 To 4 Metal Blades 40 Pc Board, Chopping/ Cutting, Plastic, Body Shape: Rectangular Material: Plastic (polypropylene), Food Grade Board Size: Length: 15 Inches (minimum) Width: 12 Inches (minimum) Thickness: 0.5 Inch (minimum) With Hole For Storage Purposes Preferably With Packing Case Food Grade And Dishwasher Safe. 20 Pcs. Boiler, Double, Material: Stainless Steel Thickness: 1/16 Inch (1.5 Mm) (minimum) Lid Material: Glass Riveted Handle On Both Side Diameter: 9 1/2 Inches (minimum) Total Height: 9.4 Inches (minimum) Inset Bottom Diameter: 9 Inches (minimum) Inset Top Diameter: 9 Inches (minimum) Capacity: 2 Liters (minimum) 30 Pcs. Braising Pan, Medium, Body Shape: Round Material: Enameled Cast Iron And Stainless Steel Size: Diameter: 28 Cm X Height: 10 Cm (minimum) Capacity: 4 Liters (approximate) With Stainless Steel Cover, Solid Cast Stainless Steel Side Handles And Riveted Handle On Both Side: Length: 10 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm 30 Pcs. Can Opener, Body Shape: Materials: Stainless Steel Dimension: Length-21 Cm X Width 10 Cm X Depth:2.5cm (minimum) Multi-use: 3 In 1 Can Opener Also Opens Bottle Tops- Can Lids And Tabs. 30 Pcs. Casserole,medium Pot, Body Shape:round Material:stainless Steel, 0.7 Mm Thick Dimension: Diameter- 24 Cm X Height -14 Cm (minimum) Tempered Glass Lid Welded Handle On Both Sides, Size: 7.5 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm Preferably With Packing Case . 30 Pcs. Casserole,small Pot, Body Shape: Round Material: Stainless Steel, 0.7 Mm Thick Dimension: Diameter- 20 Cm X Height -12 Cm (minimum) Tempered Glass Lid Welded Handle On Both Sides, Size: 7.5 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm. 20 Pcs. Colander, Medium, Medium Body Type: Round Material: 304 Stainless Steel Diameter: 30 Cm (minimum) Capacity: 8 Quarts (9 Liters) Welded Handle On Both Sides, Size: 7.5 Cm (minimum) Handle Diameter: 8 To 10 Mm Body Thickness: 0.8 Mm (minimum) 20 Pcs. Colander, Small, Body Shape: Round Material: 304 Stainless Steel Diameter: 26 Cm (minimum) Capacity: 5 Quarts (5.6 Liters) Welded Handle On Both Sides, Size: 7.5 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm Body Thickness: 0.8 Mm (minimum) Full-ring Support Base, 15 Cm Diameter Preferably With Packing Case Food Grade And Dishwasher Safe 20 Set Cup,measuring( For Solid) Set Body Shape: Round Material: Stainless Steel, 0.7 Mm Thick (minimum) Each Set Contains The Following: 1 Pc - 1 Cup (237 Ml) 1 Pc - 1/2 Cup (118 Ml) 1 Pc - 1/3 Cup (79 Ml) 1 Pc - 1/4 Cup (59 Ml) Handle Dimension: Length-12 Cm X Width-1 Cm (minimum) Measuring Capacity Engraved On The Handle Strip Handles Have Provision For Hanging Preferably With Packing Case Smooth Surfaces And Dishwasher Safe 20 Pcs. Dispenser,paper Towel Body Shape: Rectangular Material: Abs Plastic Dimensions: Length =260 Mm X Width =100 Mm X Height = 211 Mm (minimum) Capacity: 200 Paper Paper Size: Length-20 Cm X Width- 8 Cm (approximate) Mounting Style: Wall Mounted Tissue Box 12 Pcs. Fan, Electric, Ceiling Material: Metal, Plastic Size/diameter: 18 Inches Power Rating: 70 Watts (minimum), 220 / 240 Vac, 50 / 60 Hz, Single Phase Rotation Angle: 90 Degrees Base: Stable, 16 Inches Diameter (approx.) Removable Metal Guard On Front And Rear 3-speed Settings Comes With 1.5 Meters Power Cord And With Molded Male Plug To Adapt Type A Outlet (or Providing 3a Minimum Plug Adapter Is An Option) Smooth Surface, No Sharp Edges Includes User's Manual In English Which Contains: A. A Diagram Of The Parts With Their Names 6 Pcs. Fire Extinguisher With Contents .for Type A, B, C Fire: Dry Chemicals (monoammonium Phosphate) 2.portable Type 3.capacity : 5 - 6 Kgs 4.rechargeable Cylinder Metal 5.working Pressure Of Cylinder : 400 Psi 6.brass Valve With Pressure Gage 7.with Rubberized Hose And Aluminum Nozzle Attached 8.with Squeeze Lever To Discharge And Safety Pin 10.painted With Metal Primer And Red Enamel Paint 20 Pcs. Fish Poacher,medium, Body Shape: Oval Pot For Poaching Material: Stainless Steel, 0.64 Mm Thick Dimensions (l X W X D): 45 Cm X 15 Cm X 12 Cm (minimum) Handle Material: Stainless Steel Riveted Looped Handles On Both Side, 7 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm Includes Stainless Steel Lid With Handle And Removable Insert 20 Pcs. Fork, Carving Body Shape: Square Shape Prong Prong Material:high Carbon Stainless Steel Overall Length: 30 Cm (minimum) Blade Dimension: Length- 15 Cm X Width- 0.5 Cm X Thickness- 0.3 Cm (minimum) Number Of Prongs: 2 Prong Comes With Square- Shaped Prongs And Pointed Tips Abs Plastictriple-riveted Handle Preferably With Packing Case 400 Pcs. Fork, Kitchen Body Shape: Standard Material: Stainless Steel Dimension: Length - 32 Cm X Width- 3.5 Cm (minimum) Fork Size: Length: 8 Cm X Width -3.5 Cm (minimum) Handle :abs Plastic Number Of Tines: 2 Tines With Tapered End 36 Dozen Frying Pan, Large, Non Stick, Body Shape: Round Pan Material: Aluminum With Non-stick Coating Thickness: 3 Mm Thick (minimum) Dimension: Diameter-30 Cm (minimum) X Height- 5.5 Cm (minimum) 40 Pcs. Frying Pan, Medium, Non Stick, Body Shape: Round Pan Material: Aluminum With Non-stick Coating Thickness: 3 Mm Thick (minimum) Dimension: Diameter-24 Cm (minimum) X Height- 4.5 Cm (minimum) Handle Material: Stainless Steel With Silicone Riveted Handle: 19 Cm Long (minimum) Preferably With A Packing Case 30 Pcs. Frying Pan Small, Non Stick , Body Shape: Round Pan Material: Aluminum With Non-stick Coating Thickness: 3 Mm Thick (minimum) Dimension: Diameter-20 Cm (minimum) X Height- 3.8 Cm (minimum) Handle Material: Stainless Steel With Silicone Riveted Handle: 12 Cm Long (minimum) Preferably With A Packing Case Oven Safe Up To 250⁰f 22 Pcs. Funnel, S/s, Medium, Body Shape: Round Material: 304 Stainless Steel Dimension: Diameter-15 Cm (minimum) X Height- 15.8 Cm (minimum) Tube Diameter: 2 Cm X Length: 7.3 Cm (minimum) Comes With Handle For Easy Hanging Preferably With Packing Case Dishwasher Safe 22 Pcs. Funnel, S/s, Small, Body Shape: Round Material: 304 Stainless Steel Dimension: Diameter-11 Cm (minimum) X Height- 10 Cm (minimum) Tube Diameter: 1.5 Cm X Length: 5 Cm (minimum) Comes With Handle For Easy Hanging Preferably With A Packing Case Dishwasher Safe. 20 Pc Garbage Bin, Body Shape: Round Material: 304 Stainless Steel Dimension: Diameter-11 Cm (minimum) X Height- 10 Cm (minimum) Tube Diameter: 1.5 Cm X Length: 5 Cm (minimum) Comes With Handle For Easy Hanging Preferably With A Packing Case Dishwasher Safe. 20 Pc Glass Rack, Body Shape: Square Material: Polypropylene Plastic Overall Dimensions: Length - 19 1/2 Inches X Width - 19 1/2 Inches X Height - 4 Inches (minimum) Compartments: Full-size 25 Individual Compartment Glass Rack Compartment Dimensions: Length - 3 1/2 Inches X Width - 3 1/2 Inches X Height - 4 Inches (minimum) Easy Grip Handles Molded Into All Four Sides Preferably With A Packing Case 20 Pc Ice Cream Scoop, Stainless Steel Ice Cream Scoop 45mm. Simply Squeeze Handle. 30 Pc Knife,boning, Body Shape: Ergonomic Material: High Carbon Steel Overall Length: 28 Cm (minimum) Blade: Length-15 Cm X Width- 3 Cm (minimum), Pointed Tip Cutting Edge Angle From Tip To The Heel Is 13 To 14 Degrees Handle Length: 12 Cm (minimum) Handle Material: Hard Plastic Handle With Rivets Preferably Wiht Packing Case Dishwasher Safe 30 Pc Knife,chef, Body Shape: Flat Materials: Stainless Steel Overall Length: 30 Cm (minimum) Blade Size: Length - 20 Cm X Width-4 Cm (minimum) Blade Thickness: 2.5 Mm (minimum) 30 Pc Knife,cleaver, Cutting Edge: Straight, Pointed End Type: Cleaver Knife Body Shape: Flat Blade Material: Forged Stainless Steel Heavy Duty Blade Length: 17 Cm (minimum) Overall Length: 30 Cm (minimum Cutting Edge: Straight Handle Material: Ergonomic Wood Handle With Triple Rivets Blade Thickness: 3 Mm (minimum) 30 Pc Knife,oyster, Body Shape: Ergonomic Blade Material: Stainless Steel Blade Dimension: Length - 7 Cm (minimum) X Width - 2 Cm (minimum) Blade Thickness: 2 Mm (minimum) Handle Material: Smooth Wooded Handle Rounded Handle Size: Length-10 Cm X Diameter- 3.5 Cm (minimum) Total Length (from The Tip Of The Handle Up To Tip Of The Blade) :17 Cm (minimum) 4 Pc Light,emergency, 2 Heads Led Materials: Metal, Anti-rust Coated Duration Time (2 Heads): 5 Hours (minimum) Automatically Light Up During Power Outage Overcharge And Over- Discharge Protection Built - In Ac Charger, Power Cord Plug To Adapt Type A Outlet (or Providing 5a Minimum Plug Adapter Is An Option) Battery Test Switch - External Safety Fuse Head: White Led 1w (minimum) 3.5 " Dome Reflector 4 Pc Meat Slicer, Body Shape: Circular Housing Material: Die Cast Aluminum Alloy And Body Painted Dimensions: Width-40.5 Cm X Depth- 45.7 Cm X Height- 38 Cm (minimum) Stainless Steel Rotary Blade Diameter: 190 Mm (minimum) Power Source: 220 Volts-230 Volts, 60 Hz With Power Cord 1.5 Meter Long With Attachment Of Standard Type A Male Plug Or Provide Plug Adopter 10a/220v 30 Set Pastry Tube, Stainless Steel Pastry Tube 24, Big 40 Pc Peeler, Y -type, Rack Dimension: Length: 38 Cm X Width 23 Cm (minimum) Type: Y-type Peelers Body Shape: Ergonomic Material: Stainless Steel Overall Dimensions (l X W X H): 7 Inches X 2 1/4 Inches X 1 Inch (minimum) Blade Material: 304 Stainless Steel, 0.7 Mm Head Dimension: (l X W X H) 2 1/4 Inches X 2 1/4 Inches X 1 Inch (minimum) Handle Material: Stainless Steel Handle Length: 4 3/4 Inches X 1 Inch Diameter (minimum) 2 In 1 Design With 2 Blade Reel, Built In Potato Eye Remover And Hole For Hanger Preferably With A Packing Case 14 Set Pepper And Salt Mill Food Grade And Non-toxic Material. Mill Cookery Nc Ii Type: Pepper & Salt Mill Body Shape: Round Body Material: Wood Size: Diameter: 5 Cm X Height: 20 Cm (minimum) Carved Of Wood With Stainless Steel Grinding Mechanism 20 Pack Piping Bag, Body Shape: Triangular Material: Transparent Disposable Plastic For Dispensing Ingredients To Pastries Length: 9 Inches Minimum Width: 3 Inches (minimum) Volume: 500 Ml (approximate) 10 Pc Plate Rack Shape: Rectangular Material: 304 Stainless Steel Dimension: Length-475 Mm X Width- 290 Mm X Height- 380 Mm (minimum) 12 Set Preparation Table With Sink, Heavy Duty Wire Shelving, 2.6 Mm Diameter (minimum) Table With Sink Cookery Nc Ii Type: Preparation Table With Sink & Sheleves Body Shape: Rectangular Material: Stainless Steel, 1 Mm Thick (minimum) Dimensions: L-1200 Mm X W - 700 Mm X H - 850 Mm (minimum) Stainless Steel Table Top And Stainless Steel Under Shelf Fully Welded Construction Sink: Left Side Single Bowl Sink With Drainer 4 Inches & Faucet Provision Sink Dimension (l X W X D) 400 Mm X 500 Mmx 25 Mm (minimum) 4 Pc Pressure Cooker, Cooker Body Shape: Round Material: Polished Aluminum Dimension: Diameter: 32 Cm X Height: 25 Cm (minimum) Capacity: 10 Quarts (11.3 Liters) Side Handles For Secure Carrying Equipped With Safety Opening Mechanism, Spring Safety Valve, Rubber Seal Ring 24 Pc Roasting Pan , Body Shape:rectangular Material: Stainless Steel Dimension: Length: 40 Cm X Width-35 Cm X Height -7 1/2cm (minimum) Thickness: 1.5 Mm Thick (minimum) Welded Handles On Both Sides Removable Stainless Steel Wire Rack 40 Pc Scissor, Kitchen Type:kitchen Scissor Body Shape: Ergonomic Blade Material: Stainless Steel, 2 Mm Thick Handle Material Heavy Duty Acrylonitrile Butadiene Styrene (abs) Plastic Overall Length: 20 Cm (minimum ) Width: 7.5 Cm (minimum) 30 Pc Siever,small Type: Fine Mesh Siever Body Shape: Round Material: Stainless Steel Diameter: 20 Cm (minimum) Depth: 7 Cm (minimum) Twin Wire Handle: Length 20 Cm X 5 Mm Diameter (minimum) Fine Mesh: 0.7 Mm (1/32 Inch) (minimum) Preferably With A Packing Case 30 Pc Skimmer, Fine Type: Medium Fine Mesh Skimmer Body Shape: Round Material: Stainless Steel, Polished Overall Length: 34 Cm (minimum) Skimmer Head: Diameter -10 Cm X Depth- 4 Cm (minimum) Diameter Of Holes: 2 Mm (approx.) Handle: Length- 12 Cm X Diameter- 2 Cm (minimum) Handle Has Hole For Hanging Preferably With A Packing Case 30 Pcs. Skimmer,spider, Dishwashing Safe Type: Skimmer, Spider Body Shape: Round Material: Stainless Steel, Polished Overall Length: 35 Cm (minimum) Skimmer Head Diameter: 15 Cm X Depth 4 Cm (minimum) Handle Length: 12 Cm X 2 Cm Diameter (minimum) Preferably With A Packing Case Dishwasher Safe. 24 Pcs. Soup Cup, Rack Body Shape: Square Material: Polypropylene Plastic Dimension: Length: 50 Cm X Width: 50 Cm X Height: 10 Cm (minimum) Compartment Length: 11 Cm Compartment Width: 11 Cm Compartment /inside Height: 6.7 Cm No. Of Compartment: 16 Compartments 20 Pc Soup Ladle, 12oz Body Shape: Round Material: Stainless Steel Thickness: 1 Mm Thick (minimum) Handle Length: 34 Cm (minimum) Capacity: 12 Oz. (341 Ml) Ladle Type: Round Bottom Hooked Handle Design Allows It To Easily Sit On The Edge Of Pots. Preferably With A Packing Case Dishwasher Safe 20 Pc Soup Ladle, 3 Oz Body Shape: Round Material: Stainless Steel Thickness: 1 Mm Thick (minimum) Handle Length: 28 Cm (minimum) Capacity: 3 Oz. (85 Ml) Ladle Type: Round Bottom Hooked Handle Design Allows It To Easily Sit On The Edge Of Pots. Preferably With A Packing Case Dishwasher Safe Must Be Branded 20 Pc Soup Ladle 6 Oz. Body Shape: Round Material: Stainless Steel Thickness: 1 Mm Thick (minimum) Handle Length: 30 Cm (minimum) Capacity: 6 Oz. (170 Ml) Ladle Type: Round Bottom Hooked Handle Design Allows It To Easily Sit On The Edge Of Pots. Preferably With A Packing Case Dishwasher Safe 20 Pc Soup Ladle 8 Oz. Body Shape: Round Material: Stainless Steel Thickness: 1 Mm Thick (minimum) Handle Length: 30 Cm (minimum) Capacity: 8 Oz. (236 Ml) Ladle Type: Round Bottom Hooked Handle Design Allows It To Easily Sit On The Edge Of Pots. Preferably With A Packing Case 62 Pc Spatula, Type: Offset Spatula Body Shape: Flat Blade Material: Stainless Steel 316 Handle Material: Hardwood (smooth Finish) With Rivets Blade Dimension: Length= 7 .5 Inches X Width-1.5 Inches (minimum) Thickness Of Blade: 1.7 Mm Thick (minimum) Total Length = 12 To 14 Inches Preferably With A Packing Case Dishwasher Safe Must Be Branded. 400 Pc Spoon, Kitchen Body Shape: Oval Material: Stainless Steel, 1.5 Mm Thick Overall Length: 30.5 Cm X Width-7.5 Cm (minimum) Spoon Head Dimension (l X W) 9 Cm X 7.5 Cm (minimum) Handle: Abs Plastic Spoon Head: Oval Type Preferably With A Packing Case Heat Resistant Up To 220 ° C Dishwasher Safe Must Be Branded. 60 Pc Spoon, Kitchen (slotted) Kitchen Spoon Slotted Body Shape: Oval With Slot Material: Stainless Steel, 1.5 Mm Thick Overall Length: 30.5 Cm X Width-7.5 Cm (minimum) Spoon Head Dimension (l X W) 9 Cm X 7.5 Cm (minimum) 30 Set Spoon, Measuring Body Shape: Bowl In Shape Material: Stainless Steel, 0.7 Mm Thick (minimum) The Set Consists Of The Following Sizes: 1 Pc - 1 Tbsp. (15 Ml) 1 Pc - 1/2 Tbsp. ( 7.5 Ml) 1 Pc - 1 Tsp. (5 Ml) 1 Pc - 1/2 Tsp. (2.5 Ml) 40 Pcs. Spoon, Parisienne Body Shape: Round Double Headed Parisiennes Scoop Bar Tool Material: Stainless Steel, Polished Overall Length: 240 Mm (minimum) Scoop Diameter: 30 Mm And 24mm (minimum) With Plastic Handle (polypropylene), Size: 130 Mm X Width-20 Mm (minimum) Draining Small Hole In The Scoop 40 Pc Spoon, Serving Preferably With A Packing Case Type: Serving Spoon Body Shape: Oval Materials: Stainless Steel Dimension: Length: 23 Cm X Width: 5 Cm (minimum) Scoop Dimension (l X W X D): 7 Cm X 5 Cm X 0.9 Cm (minimum) Spoon Thickness: 1.6 Mm (minimum) Preferably With A Packing Case Dishwasher Safe Must Be Branded. 30 Pc Spoon,wooden Body Shape: Oval Material: Hardwood Dimensions: Length- 10 Inches X Width- 2 Inches (minimum) Bowl Dimension: Length -3 Inches X Width 2 Inches X Depth -3/4 Inches (minimum) Total Length: 10 Inches (minimum) Preferably With A Packing Case Smooth Surface Finished And No Sharp Edges 20 Pc Stock Pot,large . Body Shape: Round Material: Stainless Steel, 0.8 Mm Thick (minimum) Top Diameter: 30 Cm (minimum) Height: 31 Cm (minimum) 30 Pc Strainer, Chinois,small Body Shape: Conical Material: Stainless Steel Strainer Diameter: 20 Cm (minimum) Strainer Depth: 21.5 Cm (minimum) Handle Length: 20 Cm (minimum) With 2 Mm. (approx.) 30 Pc Strainer,chinois,medium Medium Body Shape: Conical Material: Stainless Steel Strainer Diameter: 20 Cm (minimum) Strainer Depth: 21.5 Cm (minimum) Handle Length: 20 Cm (minimum) With 2 Mm. (approx.) 26 Pc Strainer,medium,fine Body Shape: Round Material: Stainless Steel Strainer Diameter: 20 Cm (minimum) Strainer Depth: 7 Cm (minimum) Handle Length: 18 Cm (minimum) With 2 Mm. (approx.) 30 Pc Strainer, Small,fine Body Shape: Round Material: Stainless Steel Strainer Diameter: 13 Cm (minimum) Strainer Depth: 5 Cm (minimum) Handle Length: 13 Cm (minimum) With 1 Mm. (approx.) 30 Pc Tenderizer, Medium Aluminum Meat Tenderizer 16 Pc Thermometer,pocket/pin Pocket/pin Food Thermometer 20 Pc Tong,12'' Body Shape: Standard Material: Stainless Steel Size: 12 Inches Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Tongs Lock Closed For Storage Preferably With A Packing Case Food Grade And Dishwasher-safe Must Be Branded 20 Pc Tong 8'' Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Tongs Lock Closed For Storage Preferably With A Packing Case Food Grade And Dishwasher-safe Must Be Branded 30 Pc Tray,baking,small, Tray Body Shape: Rectangular Material: Stainless Steel Dimension: 20 Cm X 30 Cm X 3.7 Cm (minimum) 36 Pc Tray,utility,medium,plastic White Plastic, White Multi Purpose 13”x10”utility Tray 30 Pc Turner,3'x6'', Slotted Turner, 3" X 6" Type: Slotted Turner, 3" X 6" Body Shape: Straight Material: Stainless Steel Blade Size (lx W): 6 Inches X 3 Inches (minimum) Handle Length: 5 Inches (minimum) Overall Length: 13 Inches (minimum) Solid Turner With Straight Slotted Blade Wooden Handle With Triple Rivets Preferably With A Packing Case Dishwasher Safe Must Be Branded 4 Pc Utility Cart, Stainless Steel 3 Tier Trolley Cart 75x40x85. 20 Pc Weighing Scale 1 Kg. Digital Type: Digital Weighing Scale Body Shape: Rectangular Materials: Engineering Plastic And Stainless Steel Weighing Plate Capacity: 1 Kg Accuracy: 1 Gram Back Light Lcd Display With 15 Mm Minimum High Digits Weighing Units: Gram, Ounce, Pound Size: (l X W X H Mm ) 163 Mm X 245 Mm X 79 Mmm (minimum) 20 Set Weighing Scale 5kg. Type: Mechanical Weighing Scale Body Type: Circular Bowl Material: Stainless Steel Bowl And Metal Body (coated) Mechanism Type: Spring Lever Capacity: 5 Kg /11 Lb. Sensitivity/graduated By 10 Gm Measurement Units: Gram/kilogram Manual Setting On Zero, Must Be Accurate And Durable Calibrate The Scale Using The Adjustment Knob Preferably With A Packing Case Delivery Must Include Instruction Manual Written In Good English With Service Centers Located In The Major Cities In The Philippines Warranty Period Of 1 Year (parts And Service) Must Be Branded 40 Set Wire Skimmer Small, Type: Skimmer, Wire Mesh Body Shape: Round Material: Stainless Steel, Polished Overall Length: 40 Cm (minimum) Skimmer Head Diameter: 12 Cm (minimum) Diameter Of Holes: 2 Mm (approx.) Handle Has Hole For Hanging Preferably With A Packing Case Dishwashing Safe Must Be Branded. 40 Pc Wire Whisk Heavy Duty Type: Wire Whisk, Heavy Duty Body Shape: Ballon Material: Heavy Duty Stainless Steel Dimensions (l X W): 31.8 Cm X 7.6 Cm (minimum) Handle Length: 12 Cm (minimum) With Hanging Loop No. Of Wires: 8 Wires Wire Diameter: 2 Mm (minimum) Preferably With A Packing Case Dishwasher Safe Must Be Branded. 40 Pc Wire Whisk, Medium, Type Wire Whisk, Medium Body Shape: Ballon Material: Stainless Steel Wire Whisk Medium Dimensions (l X W): 25.4 Cm X 7 Cm (minimum) Handle Length: 10 Cm (minimum) With Hanging Loop No. Of Wires: 6 Wires Wire Diameter: 1.8 Mm (minimum) Preferably With A Packing Case Dishwasher Safe Must Be Branded. 40 Pc Wire Whisk,small, Type: Wire Whisk, Small Body Shape: Baloon Material: Stainless Steel Wire Whisk Medium Dimensions (l X W): 20.3 Cm X 6 Cm (minimum) Handle Length: 10 Cm (minimum) With Hanging Loop No. Of Wires: 6 Wires Wire Diameter: 1.8 Mm (minimum) Preferably With A Packing Case Dishwasher Safe Must Be Branded. 18 Pc Wok,medium Type: Wok, Medium Body Shape:round Material: Carbon Steel Thickness: 1.8 Mm Thick (minimum) Dimensions (dia. X H): 45 Cm X 14 Cm (minimum) Handle Material: Steel Riveted Convenient Both Side Handle 10 Cm (minimum) With Flat Bottom Preferably With A Packing Case Dishwashing Safe Must Be Branded 18 Pc Wok,small Type: Wok, Small Body Shape: Round Material: Carbon Steel Thickness: 1.5 Mm Thick (minimum) Dimensions (dia. X H): 36 Cm X 10 Cm (minimum) Handle Material: Steel Riveted Convenient Both Side Handle 8 Cm (minimum) With Flat Bottom Preferably With A Packing Case Dishwashing Safe Must Be Branded 12 Pc Working Table, Stainless, 4 Seaters Stainless Working Table , Two Layer (120x60x80) 30 Pc Zester, Type: Cheese Zester Body Shape: Standard Material: Stainless Steel Grating Surface Dimensions (l X W): 20.3 Cm X 4 Cm (minimum) Overall Length: 32.5 Cm (minimum) Handle Material: Plastic (polypropylene) Ergonomic Handle Preferably With A Packing Case Dishwasher Safe The Plastic Material Used Must Be Non-toxic Must Be Branded. Lot 6. Sumirap National High School (housekeeping Nc Ii)-php 326,452.00 1 Pc Alarm Clock Alarm Clock, Digital, Overall Dimensions: 13.5 X 8 X 4.5 Cm (approx.) Material: Plastic (pe/abs) Illuminated Lcd Digital Display: Time (12/24), Calendar (mm/dd), Temperature, Alarm Status (on/off), Snooze Display Size: 10 X 5 Cm (minimum), Time Can Be Read 30 Ft Day Time. Runs On Aaa Battery Which Come Together With The Item Smooth Surface, No Sharp Edges, Includes User's Manual Which Contains Operation Procedure, Name Of Parts, Safety Precautions, Trouble Shooting) 25 Pc Apron, Polyester-cotton (bib Apron, Sleeveless Adjustable Neck Loop Material : Polyester - Cotton Fabric Dimension : 70 To 60 Cm (minimum) With 2 Or 3 Pockets Uni-color, Dark No Sharp Edges And Loose Threads) 5 Pc Baskets, Laundry (3 - Bag Laundry Sorter, With Wheels Bag: Polyester, Rectangular Shape, Detachable From Frame With Metal Handle And Hanging Hook Bag Dimensions : Rectangular 22 X 15 X 8 Inch (minimum) Frame Material : Corrosion Resistant Steel, Sturdy No Wobble Frame Overall Dimensions : Rectangular, 31 X 30 X15 Inch (minimum) With Four Casters, 2 Inch Diameter (minimum) Smooth Surface, No Sharp Edges) 1 Set Bed, Queen (bed Set, Queen Size (60 X 75 Inch) Rectangular 1) Frame: Knock-down Type, All Steel, Powder Coated Including Head Board, Bare Weight: 20 Kg (minimum) No Wobble And Noise 2) Comes With Fabric Covered Foam 6 Inches Thick Foam Density: 29 -33 Kg/cu.m. 3) No Sharp Edges) 1 Set Bed, Single (bed, Single Size (w36 X L75 Inch) Rectangular 1) Frame: Knock-down Type, All Steel, Powder Coated Including Head Board, Bare Weight: 13 Kg (minimum) No Wobble And Noise 2) Comes With Fabric Covered Foam 6 Inches Thick Foam Density: 29 -33 Kg/cu.m. 3) No Sharp Edges) 10 Pc Board, Ironing (type: Foldable Type Ironing Board Body Shape : Standard Material : 25 Mm Tubing Approx., 0.8 Mm Thickness Board Size: 32 Inches (minimum ) Body Size :120 Cm X 30 Cm X 5 Cm Color : Any Comes With Box No Sharp Edges) 25 Pair Boots, Safety, Plastic (upper Material: Elastic Pvc Sizes: 7 Inches - 5pcs 8 Inches - 5pcs 9 Inches - 5pcs 10 Inches -5pcs 11 Inches - 5pcs Height: 13 To 14 Inches Plain Toe Type Of Boots: Unisex Rain Boots With Rugged Tractor Lug Outsole Packed With Carton Box Per Size) 15 Pc Brushes, For Housekeeping (brush, Floor Scrubbing, Angled Long Handle Bristle Material : Plastic, Stiff Handle Material : Metal Tubular Corrosion Reistant, Overall Length : 120 Cm. (minimum) Bristle Length : 5 Cm (=/- 1cm) Scrubbing Surface : 25 X 6 Cm (+/-1 Cm) No Sharp Edges) 10 Pc Buckets, Water (water Bucket Bucket Material : Hard Plastic, Round Body Capacity : 10 To 12 Liters Handle Material : Steel Smooth And Glossy Surface, No Sharp Edges) 10 Pc Caddy, Toilet (carrying Caddy For Toilet Cleaning Supplies Holds Spray Bottles And Other Cleaning Supplies, No. Of Compartments: 3 (minimum) Material :plastic Tray Depth: 11 Cm (approx.) Overall Dimension: 36 X 26 Cm (approx.) Smooth Surface, No Sharp Edges) 1 Unit Carpet Sweeper (carpet Sweeper, Cordless Electric Motorized Single Brush Roll (removable) Body Material : Hard Plastic ,(abs) Or Its Equivalent, Any Color Equipped With Rechargeable Battery (16 Minutes Run Time On Carpet), Removable Dirt Box Sweep Width : 8 Inches (minimum) Capacity (volume) : 0.35 Lit.(minimum) Handle: Metal, Powder- Coated, With Plastic/rubber Grip, Swivel Steering Assembled Height: 44 Inches (minimum) Comes With Battery Charger 220/240vac, 50/60hz With Plug To Adapt Type A Outlet (or Providing 3a Minimum Plug Adapter Is An Option) No Sharp Edges Includes User's Manual Which Contains Operation Procedure, Name Of Parts, Safety Precautions, Trouble Shooting.) 1 Unit Cart, For Housekeeping Nc Ii (housekeeping Cart Trolley, Equipped With Three-shelves With Steel/laminated Panels Single Door, Top Layer With Divider, Bag Holder, And 4 Wheels. Cart Frame: Steel, Powder Coated. Wheels: 2non-swivel 2 Swivel, 6 Inch Diameter, Non-markings. Overall Dimensions : Rectangular 90 X 48 X 1010 Cm (minimum) Comes With Accessory Linen Bag Smooth Surface, No Sharp Edges) 50 Pc Cleaning Cloth, Linth-free (lint Free Cleaning Cloths Material : Cotton Dimensions : Rectangular 16 X 26 Inch) 1 Unit Coffee Maker (coffee Maker, Electric Material: Metal, Plastic, Glass. Capacity: 6 Cups (minimum). Detachable Tank, With Water Level Indicator. Non-stick Warming Plate : Removable And Washable Filter Non-drip Valve : Lighted On/off Switch Power Supply: 220 V -240 V Ac 50/60 Hz , 500w Minimum Comes With A Heat Resistant Glass Pitcher. With A 1 Meter (minimum) Power Cord, Molded Male Plug To Adapt Type A Outlet (or Providing 5a Minimum Plug Adapter Is An Option). Smooth Surface, No Sharp Edges With Dti-bps Certification, Brand And Electrical Ratings Clearly And Permanently Mark On The Item. Comes With English Manual That Contains: Users Guide, List Of Parts, Maintenance Guide, Safety Guide. 1 Year Warranty Parts And Service With Service Centers Located In Major Cities In The Philippines) 5 Pc Dust Pan (dust Pan, Upright Standing Material: Plastic Overall Length: 65 Cm (minimum) Pan: Round Back, 24 X 26 X 9 Cm (minimum) Smooth Surface, No Sharp Edges) 5 Pc Duster, Anti-static (anti-static Duster Duster Material : Polypropylene Micro Fiber Duster: Length : 30 Cm (minimum), Overall Length: 50 Cm (minimum) Handle Material : Hard Plastic, No Sharp Edges) 7 Unit Fan, Electric ( Stand Fan, Electric Material: Metal, Plastic Size/diameter: 18 Inches Power Rating: 70 Watts (minimum), 220 / 240 Vac, 50 / 60 Hz, Single Phase Rotation Angle: 90 Degrees Base: Stable, 16 Inches Diameter (approx.) Removable Metal Guard On Front And Rear 3-speed Settings Comes With 1.5 Meters Power Cord And With Molded Male Plug To Adapt Type A Outlet (or Providing 3a Minimum Plug Adapter Is An Option) Smooth Surface, No Sharp Edges Includes User's Manual In English Which Contains: A. A Diagram Of The Parts With Their Names, B. Operating Procedures On How To Use The Equipment, C. Safety Precautions When Using The Equipment, D. Basic Troubleshooting And Maintenance Procedures With Dti-bps Certification, Brand And Electrical Ratings Clearly And Permanently Mark On The Item 1 Year Warranty Parts And Service) 3 Pc Fire Extinguisher(with Contents) (1.for Type A, B, C Fire: Dry Chemicals (monoammonium Phosphate) 2.portable Type 3.capacity : 5 - 6 Kgs 4.rechargeable Cylinder Metal 5.working Pressure Of Cylinder : 400 Psi 6.brass Valve With Pressure Gage 7.with Rubberized Hose And Aluminum Nozzle Attached 8.with Squeeze Lever To Discharge And Safety Pin 10.painted With Metal Primer And Red Enamel Paint 11.includes With User's Guide In English That Contains: A. Operating Procedure On How To Use The Equipment B. Safety Precaution When Using The Equipment 12.1 Year Warranty Parts And Service 13.the Item Must Be Branded And Have Good Quality) 10 Pc Flashlight (flashlight Led 1,000 Lumens (minimum), Color : White , Battery: Rechargeable, At Least 3,500 Mah , Can Be Used Also With 3 X Aaa Batteries; Body: Aluminum Alloy, No Sharp Edges Dimensions : 5 Inches X 1 Inch Diameter (minimum) Operating Duration Of Battery When Fully Charged : At Least 2 Hours; Includes 220/240vac, 50/60hz Power Adapter /charger And User's Manual In English Which Includes: A. A Diagram Of The Parts With Their Names, B. Operating Procedures On How To Use The Equipment, C. Safety Precautions When Using The Equipment, D. Basic Troubleshooting And Maintenance Procedures Branded, With 1 Year Warranty 10 Pc Flat Iron (clothes Flat Iron, Electric Material : Metal /plasic Body, Heat-resistant Plastic Handle, Aluminum Sole Overall Dimension : (l X W X H) 25 Cm X 12 Cm X 12 Cm (minimum) Power Rating : 220/240 Vac, 50/60 Hz; 1000 Watts (minimum) Equipped With Light Indicator, Variable Temperature Control, Overheat Protection, Power Cord And Plug To Adapt Type A Outlet (or Providing 10a Plug Adapter Is An Option) Smooth Surface, No Sharp Edges, Comes With English Manual That Contains : Users Guide, List Of Parts, Maintenance Guide, Safety Guide. The Item Must Be Branded, With Dti-bps Certification 1 Year Warranty Parts And Service With Service Centers Located In Major Cities In The Philippines.) 10 Pc Foam, Scrubbing (1. Material: Cellulose And A Scouring Pad On One Side 2. Dimension: Length : 140 - 180 Mm ; Width : 80 - 100 Mm ; Thickness : 12 - 20 Mm 3. The Item Must Be Of Good Quality) 4 Pc Garbage Receptacles (1.bucket / Tub Material : Hard Plastic, (ps) Polystyrene 2.bucket / Tub Color : Any Color 3.capacity (gallons) : 3 Gal. (minimum) Comes With A Cover 4.the Item Must Have Good Quality) 30 Pair Gloves, Rubber (1.heavy-duty Latex-free Vinyl Rubber Gloves 2.thickness : 4 Mil 3.color : Any Color 4.size : Medium 5.other Features: Acid/solvent Resistant. 6.the Item Must Be Of Good Quality) 15 Pc Goggles, Safety (safety Goggles, Clear Polycarbonate - One Piece Lens With 180° Panoramic View, Non-fog Size/dimension: L 17 - 18.5 Cm X W 8 Cm X D 5-7.5 Cm High Impact Resistant, Ansi "z87" Compliant Firm And Comfortable Seal Around Forehead, Cheeks, Nose And Temples Protects Against Splash, Chemicals, Dust Adjustable Head Strap Shall Bear Mark Z87 Embossed Or Engraved Or Etched On The Item. Smooth Surface, No Sharp Edges) 1 Pc Hairdryer( Electric Hairdryer, With Concentrator Nozzle Two Heat Setting And 1 Speed (minimum) Rating : 220/240 Vac, 1200 W (minimum) Body Length Including Nozzle: 20 Cm Folding Handle Design, With Hanging Ring Smooth Surface, No Sharp Edges Branded, Brand Name And Electric Rating Permanently Mark On The Item, With Dti-bps Certification With User's Manual Written In English That Contains Operating Procedure, Parts With Description, Safety Procedure, And Maintenance. With Service Centers Located In Major Cities In The Philippines. 1 Year Warranty(parts & Service) 2 Roll Hose, Water(water Hose Material: Pvc Fiber Reinforced, Three (3) Layers; Any Color; Hose Length: 50 Feet; Hose Diameter: 5/8 Inches; Pressure Capacity: 200 Pounds Per Square Inch (minimum); Fitted With Male And Female Brass Couplers (nh, 11.5 Tpi) For Spray Nozzle No Sharp Edges) 3 Pc Kettle, Electric(electric Kettle Cordless (with Pouring Spout), Hinged Lid, Detachable From And Can Rotate On Its Corded Base Material : Round Stainless Body, Plastic Handle, Lid And Base Capacity : 1.5 To 2 Liter Automatic Shut - Off, With Power Indicator Light Power Rating: 220//240vac, 50/60hz, 1000 -1600 Watts Base With A 50 Cm (minimum) Power Cord, Molded Male Plug To Adapt Type A Outlet (or Providing 10a Plug Adapter Is An Option) Smooth Surface, No Sharp Edges; Dti-bps Certified Comes With English Manual That Contains: Operation Procedure, Maintenance And Safety Guide. The Item Must Be Branded, Brand Name And Electrical Ratings Permanently Mark On The Item.) 5 Pc Laundry Sorter(3 - Bag Laundry Sorter, With Wheels Bag: Polyester, Rectangular Shape, Detachable From Frame With Metal Handle And Hanging Hook Bag Dimensions : Rectangular 22 X 15 X 8 Inch (minimum) Frame Material : Corrosion Resistant Steel, Sturdy No Wobble Frame Overall Dimensions : Rectangular, 31 X 30 X15 Inch (minimum) With Four Casters, 2 Inch Diameter (minimum) Smooth Surface, No Sharp Edges) 2 Pc Light, Emergency(emergency Light, 2 Heads Led Materials: Metal, Anti-rust Coated Duration Time (2 Heads): 5 Hours (minimum) Automatically Light Up During Power Outage Overcharge And Over- Discharge Protection Built - In Ac Charger, Power Cord Plug To Adapt Type A Outlet (or Providing 5a Minimum Plug Adapter Is An Option) Battery Test Switch - External Safety Fuse Head: White Led 1w (minimum) 3.5 " Dome Reflector Power Rating: 220 -240 Vac , 50/60 Hz 20-24 Hours Charge Time Dimensions: Rectangular 27 X 7 X 27 Cm (approx.) Sooth Surface, No Sharp Edges Includes User's Manual In English Which Contains: A. A Diagram Of The Parts With Their Names, B. Operating Procedures On How To Use The Equipment, C. Safety Precautions When Using The Equipment, D. Basic Troubleshooting And Maintenance Procedures The Item Must Be Branded, Brand Name And Electrical Ratings Permanently Mark On The Item.) 2 Pc Mirror Wall Mirror With Frame Flat Glass Mirror, 2 Mm Thick (minimum), Clear With No Distortion Frame: Wood Or Plastic Commercial Finish Rectangular Shape, 3600 Sq.cm (minimum) Includes Mounting Accessories Smooth Surface, No Sharp Edges) 20 Pc Mop (mop, Handle And Mop Head Set, Refillable Head Handle: Aluminum Or Anti-rust Coated Steel, With Hard/stiff Plastic Mop Head Holder, Clip Type With Tightening Knob Overall Handle Dimension: 130 X 19 Cm (minimum) Mop Head: Cotton Thread/yarn, Sewn Tailband, L 34 X 16 X 4 Cm (minimum), White Handle: Plated Steel Tube Or Wood, Length : 40 (minimum), No Sharp Edges 1 Set Polisher, Floor, Electric, With Accessories(electric Floor Polisher With Accessories Material: Stainless Steel, Aluminum Alloy Handle: Stainless Tube, Adjustable Height 1 Meter Long (approximate), With Dual Switch Lever Size/capacity :13 Inch (minimum) Diameter Power Supply: 220/240 Vac, 50/60 Hz. Power: 1/3 Hp (minimum) Rotation Speed : 160 Rpm (minimum) Heavy Duty (royal) Power Cord Length : 12 Meters (minimum) With Type A Plug (or Providing 10a Plug Adapter Is An Option) With Pair Of Rubber Wheels, Smooth Surface, No Sharp Edges Comes With Pad Holder, 2 Pcs - Polishing Brush And 3 Pcs - Floor Polishing Pads Includes User's Manual In English Which Contains: A. A Diagram Of The Parts With Their Names, B. Operating Procedures On How To Use The Equipment, C. Safety Precautions When Using The Equipment, D. Basic Troubleshooting And Maintenance Procedures Branded, Brand Name And Electric Rating Permanently Mark On The Item, With 1 Year Warranty Parts And Service The Offered Brand Of The Item Must Be An International Brand With At Least 5 Years Presence At The Local Market And Global Presence In The Usa, Europe Or In Japan Market.) 5 Pc Shelving(shelving, Open, Knockdown Type, Adjustable Shelves Metal Powder Coated Frame Number Of Shelves : 5 Overall Dimensions : 85 X 30 X 180 Cm(minimum) Sturdy Connection, No Wobble Smooth Surface, No Sharp Edges) 5 Pc Sign, Caution(caution Sign, A Shape-2 Panel Self Standing, With D-handle, Collapsible For Easy Storage Material : High Impact Plastic, Panel Dimension : Rectangular (lxw) 55-65 Cm X 25 X 61 0m (minimum), Panel Depth : 2 Cm (minimum) Color : Yellow Print Description : "caution: Wet Floor" On One Side "cleaning In Progress On The Other Side, Both Messages Provided With Graphics Printed In Black. Font Size: 100 -120 Mm X 50 -70 Mm, Arial Smooth Surface, No Sharp Edges) 10 Pc Sponges, Dish(dish Sponge, Cellulose, Non-scratch Dimensions : 5 X 3 X 1 Inch (minimum) Branded) 10 Pc Spray Gun, Water(barber/salon Spray Gun Material: Hdpe Transparent Plastic Capacity: 300 Ml.(minimum) Trigger Type Sprayer Dimension: Diameter :7 Cm. X Height: 16.3 Cm (minimum) Rotating Nozzle To Adjust Spray Patterns Smooth Surface, No Sharp Edges Must Be Branded) 10 Pc Squeegee(squeegee, Short Handle Head/blade Material: Stainless, Rubber Handle: Plastic Or Stainless Steel Blade Length: 25 - 30 Cm Overall Length (handle And Head) 20 - 32 Cm No Sharp Edges ) 5 Pc Squeezer, Mop(mop Bucket With Squeezer/wringer And Wheels Hand Lever To Squeeze, Made Of Metal, With Hand Grip Material : Hard Plastic, (ps) Polystyrene Or Its Equivalent Capacity : 30 L (minimum) Overall Dimension (excluding Handle: ( L X W X H ) 40 X 27 X 57 Cm (minimum) Color : Yellow With 3 Inches Non-marking Rubber Casters "caution" Printed In Black On Both Sides Of The Mop Bucket Smooth Surface, No Sharp Edges) 1 Pc Step Ladder(material: Aluminum U Channel Capacity: 250 Lbs (minimum) Type: Flatform Type Number Of Step: 6 (including Top Step) Reach Height: 6 To 8 Feet(minimum) Width: 15 Inches Minimum Spread: 4 Feet (minimum) Twin Steps With Gripped Treads To Prevent Slipping Step Braces On Top And Bottom Step Heavy Duty Aluminum Foot Bracket With Slip-resistant Foot Pad With User's Manual In English Which Includes: A. Parts Manual With Labels, B. Assembly Instructions, Brandedfeet(minimum) Width: 15 Inches Minimum Spread: 4 Feet (minimum)) 2 Pc Vacuum Cleaner, Dry And Wet(electric Vacuum Cleaner, Wet And Dry Function, Sucks Even Screws, With 4 Swivel Caster Wheels Material : Hard Plastic, (abs) Or Rust Proof Body Equivalent Power Supply : 220/240vac, 50/60hz, 1000 Watts (minimum) Auto Shut Off Tank Capacity : 20 Liters (minimum) Equipped With Complete Accessories I.e., Detachable Vacuum Hose Assembly (flexible Non-kink), Extension Tubes/wands, Carpet (long Square) Brush Nozzle, Wet And Dry Floor Brush Nozzle, Crevice Nozzle, Hepa Filter, Sponge Filter/washable Cloth Bag. Comes With 4 Meters (minimum) Heavy Duty (royal) Power Cord, Molded Male Plug To Adapt Type A Outlet (or Providing 10a Plug Adapter Is An Option) Smooth Surface, No Sharp Edges With User's Manual Written In English That Contains Operating Procedure, Parts With Description, Safety Procedure, And Maintenance. The Item Must Be Branded, Brand Name And Electric Rating Permanently Mark On The Item. 1 Year Warranty Parts And Service With Service Centers Located In Major Cities In The Philippines. The Offered Brand Of The Item Must Be An International Brand With At Least 5 Years Presence At The Local Market And Global Presence In The Usa, Europe Or In Japan Market.) 1 Unit Washer, Laundry(1. Front Load Electric Washer, Laundry 2. Electronic Control, Digital Indicator Display , Transparent Glass Door 3. Body Material : Steel, Powder Coated, Any Color 4. Dimensions (wxdxh): 590 Mm (minimum) X 490 Mm (minimum) X 820 Mm (minimum) 5. Drum Material : Stainless Steel 6. Capacity : 8 Kg (minimum) 7. Spin Speed : 1200 Rpm (minimum) 8. Power Rating: 220 /240vac, 50/60 Hz. 9. Comes With A 1 Meter (minimum) Heavy Duty Power Cord With Male Plug To Adapt Type A Outlet (or Providing 20a Plug Adapter Is An Option) 10. Smooth Surface, No Sharp Edges 11. With Dti-bps Certification, Brand And Electrical Ratings Clearly And Permanently Mark On The Item 9.includes User's Manual In English Which Contains: A. A Diagram Of The Parts With Their Names, B. Operating Procedures On How To Use The Equipment, C. Safety Precautions When Using The Equipment, D. Basic Troubleshooting And Maintenance Procedures 12.the Item Must Be Branded, Dti-bps Certified, 1 Year Warranty Parts And Service 13. With Service Centers Located In Major Cities In The Philippines. 14.the Offered Brand Of The Item Must Be An International Brand With At Least 5 Years Presence At The Local Market And Global Presence In The Usa, Europe Or In Japan Market.) 2 Pc White Board(white Board, Floor Standing, Rolling Board: White Formica Laminated, Plane Will Not Deform. Board Size: Rectangular 1800mm W X 1000 To 1200mm H, Board Edges Secured With Aluminum Clip Edging 17 Mm (minimum) Wih Plastic Corner Caps Comes With Metal Tray For Marker And Eraser The Stand And Frame Are Constructed With Aluminum Or Powder Coated Steel 25mm Square Tube (minimum), Sturdy, No Wobble With 4 Lockable Hard Plastic Caster Wheels Overall Height From Floor: 210 To 214cm Smooth Surface, No Sharp Edges) Lot 7. Tangub City National High School (food And Beverage Services Nc Ii) Php 571,245.00 50 Pcs Chair, Dining Type : Dining Side Chair Body Shape: Square Material : Metal (round Or Square) Dimesion: Total Height - 33" X 15" X15" (minimum) Capacity: 150 Kg. Black Colored Powder Coated Frame With Foam On Seat Packed In Carton Box The Item Must Have Good Quality 4 Pcs Coffee Pot, 2 Pints Type: Manual Drip Body Shape: Round Material : Stainless Steel With Cover Capacity : 2 Pints Outside Diameter : 90 -110 Mm Over-all Height : 200 - 230 Mm Thickness : 0.5 - 1 Mm With Handle And Spout Packed In Carton Box The Item Must Have Good Quality 6 Pcs Container, Creamer Design: Type: Porcelain With Spout Body Shape: Circular Material: Porcelain Diameter : 50 - 65 Mm Height : 80 - 105 Mm Color : White Appearance : Glossy White Packed In Carton Box The Item Must Have Good Quality 24 Set Cups Ans Saucers 5-6 Oz. 1. Material : Porcelain 2. Capacity : 5 Oz./140 Ml 3. Heatproof Up To 300 Deg. C 4. Color : White 5. The Item Must Be Of Good Quality 6. Packed In Carton Box 10 Pcs Folder, Menu Type: Leather Menu Folder Body Shape: Rectangular Material: Leather With 2 Partitions And 6 Inserts Size: 31.5cm X 24.5cm Color: Brown/black Applicable Paper Size: A4 50 Pcs Fork, Cocktail 1. Material/appearance: Stainless Steel, Highly Polished, W/ Plain Design 2. Type : Rounded Tip Handle 3. Over-all Length : 110 - 165 Mm 4. Width : 20 - 30 Mm (minimum) 5. Handle Thickness : 2 Mm To 4 Mm 6. Handle Length : 75 - 90 Mm 7. Small, 8. Color : Silver 9. The Item Must Be Branded And Have Good Quality. 50 Pcs Fork, Dessert Type : Dessert Fork Body Shape: Fork Shape, Round Tip Material/appearance : Stainless Steel, Highly Polished,with Plain Design, Rounded Tip Handle Length : 150 Mm - 175 Mmwidth : 20 - 30 Mmhandle Thickness : 1.5 Mm - 3 Mm Number Of Tines : 4 Handle : 130 Mm (minimum) Color : Silver Packed In Plastic Pouch The Item Must Be Of Good Quality 60 Pcs Fork, Dinner Type: Dinner Fork Body Shape: Fork Shape Material / Appearance : Stainless Steel, Highly Polished, With 4 Tines Over - All Length : 120 - 175 Mm Thickness Of Handle : 2 - 3 Mm Color : Silver Packed In Plastic Pouch The Item Must Be Of Good Quality 36 Pcs Fork, Fish Type : Fish Fork Body Shape: Fork Shape With Round Tip Material / Appearance : Stainless Steel, Highly Polished, With Plain Design Over-all Length : 180 - 215 Mm Fork Width : 1.5 Mm - 3 Mm Fork Thickness : 1 Mm - 2 Mm Number Of Tines : 4 Length Handle : 120 - 130 Mmhandle Thickness : 2 Mm - 3 Mm Color : Silver Packed In Plastic Pouch The Item Must Be Of Good Quality 36 Pcs Fork, Oyster Type: Oyster Fork Body Shape: Fork Shape Material: Stainless Steel, With High Polish Appearance, And With Plain Design Length: 90 - 120 Mm Thickness: 1 Mm - 3 Mm Silver Color With Three Short Wide Curved Tines Packed In Plastic Pouch The Item Must Be Of Good Quality 24 Pcs Glass, Champagne Flute Type : Flute Glass Body Shape: Round Material: Clear Crystal Glass Dimension : Height: 20 -24 Cm, Top Diameter: 50 -70 Mm, Bottom Diameter: 60 - 80 Mm Capacity: 250 Ml. (minimum) Thickness: 1.5 - 3 Mm Packed In Carton Box The Item Must Have Good Quality 36 Pcs Glass, Collins Type: Tumbler Body Shape: Round Material : Clear Glass Capacity : 10 Oz To 14 Oz Thickness : 1.5 -3 Mm (minimum) Packed In Carton Box The Item Must Have Good Quality 36 Pcs Glass, Juice/hi-ball 1. Material : Clear Glass 2. Type : Hi-ball 3. Height : 140 - 160 Mm 4. Bottom Diameter : 50 -70 Mm 5. Top Diameter : 50 - 70 Mm 6. Thickness : 2 - 4 (minimum) 7. Capacity : 8 Oz. To 10 Oz. 8. Diswasher Safe 9. The Item Must Be Branded And Good Quality 10. Packed In Carton Box 36 Pcs Glass ,pilsner(ice Tea Glass) Type:falired Rim,body Shape:round Slender Bowl,material:clear Glass Capacity:20 0z To 23 Oz With Flaired Rimand Slender Shape Packed In Carton Box.the Item Must Have Good Quality. 36 Pcs Glass, Red Wine Type: Royalty Body Shape: Balloon Shaped Bowl Material: Crystal Clear Glass Rim Diameter : 55 - 60 Mm Thickness : 1.5 Mm - 3 Mm Over - All Length : 200 -220 Mm Capacity : 250 -300 Ml Stem Diameter : 6 - 8 Mm Stem Length : 85 - 90 Mm Base Diameter : 75 - 85 Mm Base Thickness : 2 - 4 Mm 40 Pcs Glass, White Wine Type: Royalty Body Shape: Balloon Shaped Bowl Material: Crystal Clear Glass Rim Diameter : 55 - 60 Mm Thickness : 1.5 - 3 Mm Over -all Length : 200 -220 Mm Capacity : 270 - 300 Ml Stem Diameter : 6 - 8 Mm Stem Length : 75 - 85 Mm Base Diameter : 70 - 80 Mm Base Thickness : 2 - 5 Mm 4 Pcs Gravy Boats Type: Steel Type Body Shape: Boat Shape With Handle Material: Stainless Steel Capacity : 5 Oz. Appearance: Mirror Polish Finish Size :17cm X 7.3cm X 8.2 Cm / 6.7 X 2.9 X 3.2 Inches (minimum) The Item Must Have Good Quality Packed In Plastic Pouch 4 Pcs Ice Bucket, 2 Liters With Tongs Type: Steel Type Body Shape: Circular Set Includes: A. Ice Bucket Material : Stainless Steel Diameter : 140 - 180 Mm Height : 140 - 170 Mm Thickness Of Bucket : 0.7 - 2 Mm Capacity : 2 Liters (minimum) The Item Must Have Good Quality 24 Pcs Knife, Butter 1. Material : Stainless Steel W/ Highly Polished Appearance 2. Over-all Length : 140 Mm - 150 Mm 3. Handle Thickness : 3 Mm - 5 Mm 4. With Dull Edge And Rounded Tip 5. The Item Must Have Good Quality. 6. Packed In Carton Box 24 Pcs Knife, Dinner Type: Dinner Knife Body Shape: Flat With Round Tip Material / Appearance : Stainless Steel Blade Highly Polished Handle Material : Stainless Steel Overall Length : 160 - 190 Mm Blade Thickness : 2 - 4 Mmhandle Thickness : 3 - 6 Mm Serrated Blade With Rounded Tip Packed In Carton Box The Item Must Have Good Quality 24 Pcs Knife, Fish Type : Fish Knife Body Shape: Flat With Pointed Tip Material / Appearance : Stainless Steel, Highly Polished W/ Plain Design Overall Length : 200 - 220 Mm Width Blade : 20 - 25 Mm Thickness Of Blade : 2 Mm - 4 Mm Thickness Of Handle: 3 Mm - 6 Mm Wide Blade, Dull Edge, Tip Made With A Notched Point Color : Silver Packed In Carton Box The Item Must Have Good Quality 20 Pcs Napkin Holder (stainless) Type: Steel Type Body Shape: Rectangular Material : Stainless Steel With Highly Polished Appearance Dimension : Width : 70 - 90 Mm X Length : 150 - 170 Mm , Thickness : 0.7 Mm -2 Mm Packed In Plastic Pouch The Item Must Have Good Quality 20 Pcs Order Pads Type: Numbered Pads Body Shape: Rectangular Material : 80 Gsm Offset Paper Each Pad Comes With A 100 Sheets And Corresponding Copy Page Each Pad Has Sequentially Numbered Orders To Make It Easy To Keep Track With 100 Sheets Per Pad And 10 Pads Included Can Take 1000 Orders Before You Run Out Packed In A Plastic Pouch 12 Pc Pepper And Salt Mill Type: Pepper & Salt Mill Body Shape: Round Body Material: Wood Size: Diameter: 5 Cm X Height: 20 Cm (minimum) Carved Of Wood With Stainless Steel Grinding Mechanism Color: Natural Screw Cap At The Top Of The Mill To Adjust The Thickness Of Peeper Or Spices Preferably With A Packing Case Food Grade And Nontoxic Must Be Branded 50 Pc Plate Covers Type: Steel Type Body Shape: Circular Material: Stainless Steel, Mirror Polished Diameter: 10 1/4 Inches (minimum) Height: 2 7/8 Inches (minimum) Thickness: 1/16 Inch. (minimum) With Handle Packed In Plastic Pouch The Item Must Have Good Quality 50 Pc Plate, Dessert, 7" To 8" Type: Plain Type Body Shape: Circular Material: Porcelain Supply Must Be A Set, Consisting Of One (1) Of Each: 7 Inches And 8 Inches Plates Color : White Inner Diameter: 145 To 165 Mm Thickness : 3 To 6 Mm Smooth And Glossy Surfaces Packed In Carton Box The Item Must Have Good Quality 60 Pc Plate, Dinner, 10" Type: Plain Type Body Shape: Circular Material: Porcelain With No Design Color: White Inner Diameter : 200 Mm - 215 Mm Outer Diameter : 250 - 260 Mm Thickness : 3 Mm - 6 Mm Smooth And Glossy Surfaces Packed In Carton Box The Item Must Have Good Quality 50 Pcs Plate, Fish, 8" To 9" Type: Plain Type Body Shape: Circular Material : Porcelain With No Design Supply Shall Be A Set Consisting Of: One (1) Each 8 Inches And One (1) Each, 9 Inches Color : White Inner Diameter : 165 Mm - 190 Mm (minimum) Thickness : 3 Mm - 6 Mm Smooth And Glossy Surfaces Packed In Carton Box The Item Must Have Good Quality 10 Pcs Round Table (8's) Type: Foldable Body Shape: Round Material: High Density Polyethylene Table Top Powder Coated Steel Frame Size: 154cm X 74cm X4.5cm (minimum) Good For 8 To 10 Seater Capacity Tube Size : 28 Mm Diameter X 1 Mm Thickness Packed In A Carton Box The Item Must Have Good Quality 50 Pcs Salad Forks Type: Salad Fork Body Shape: Fork Shape Material/appearance: Stainless Steel, Highly Polished, With 4 Tines Length: 150 Mm - 175 Mm Thickness Of Handle : 2 Mm - 3 Mm Color: Silver Packed In Plastic Pouch The Item Must Be Of Good Quality 50 Pcs Salad Knife Type: Salad Knife Body Shape: Semi Rectangular Blade With Pointed Tip Material/appearance: Stainless Steel, Highly Polished, W/ Plain Design Overall Length: 145 -160 Mm Blade Thickness: 2 Mm To 4 Mm Handle Thickness: 4 Mm To 6 Mm Handle Material: Stainless Steel Rounded Tip Handle Packed In Carton Box The Item Must Have Good Quality 50 Pcs Salad Plates 7" To 8" Type: Plain Type Body Shape: Circular Material: Porcelain With No Design Supply Must Be A Set Consisting Of One (1) Each: 7 Inches And 8 Inches Plates Color: White Diameter (inner): 150 Mm - 165 Mm Thickness: 3 Mm - 6 Mm Smooth And Glossy Surfaces Packed In Carton Box The Item Must Have Good Quality 20 Pcs Salt And Pepper Shakers Type: Glass Type Body Shape: Square Material: Glass And Aluminum Over-all Height: 75 -90 Mm Length: 50 -60 Mm Width: 50 -60 Mm Aluminum Cover Packed In Carton Box The Item Must Have Good Quality 25 Pcs Sauce Laddles Type: Spouted Bowl Body Shape: Circular With Pouring Spout Material: Stainless Steel, Highly Polished Appearance Over-all Length: 220 -230 Mm Ladle Bowl Length: 60 -65 Mm Long Ladle Bowl Diameter: 65 -70 Mm Depth: 10 -15 Mm Handle Details: 150-155 Mm Long X 20 -30 Mm Wide X 2 - 4 Mm Thick Color: Silver With Hang Hole For Hanging And Easy Access Dishwasher Safe Packed In Plastic Pouch The Item Must Have Good Quality 50 Pcs Server, Cake 1. Material : Stainless Steel Blade , Highly Polished Appearance 2. Over-all Length : 220 To 270 Mm 3. Width : 60 - 80 Mm 4. Thickness : 1.5 Mm To 2 Mm 5. Handle : 120 -140 Mm Long, Non-toxic Plastic 6. Shape : Shovel-shaped 7. Color : Silver 8. The Item Must Have Good Quality 9. Packed In Carton Box 50 Pcs Service Forks Type : Service Fork Body Shape: Fork Shape Material/appearance: Stainless Steel, Highly Polished, W/ Palin Design Over-all Length: 220 Mm - 260 Mm Width: 20 - 25 Mm Handle Thickness: 1.5 Mm - 4 Mm Handle Length - 165 Mm - 185 Mm 4 Tines Color: Silver Packed In Plastic Pouch 25 Pcs Service Tray Type: Plastic Body Shape: Rectangular Material: Plastic (pp) Size : 14 Inches X 18 Inches X 1 Inch (minimum) Color : Any Packed In Plastic Pouch The Item Must Have Good Quality 25 Set Show/service/base Plates 11" To 14" Type: Plain Type Body Shape: Round Material: Porcelain With No Design Supply Must Be A Set Consisting (1) Of Each: - 11 Inches, - 12 Inches, - 13 Inches, And - 14 Inches Plates Color: White Diameter, Inner : 225 Mm - 250 Mm Thickness: 3 Mm - 6 Mm Smooth And Glossy Surfaces 50 Pcs Side Plates Or Bread Plates 6'' Type: Plain Type Body Shape: Round Material: Porcelain With No Design Color: White Inner Diameter: 95 Mm To 120 Mm Outer Diameter: 145 Mm To 170 Mm Thickness : 3 Mm - 6mm Smooth And Glossy Surfaces Packed In Carton Box The Item Must Have Good Quality 50 Pcs Side Towels Type: Chef's Towel Body Shape: Rectangular Material: Oxford Polyester Soft Cloth Over-all Length : 640 - 680 Mm Over-all Width : 420 -460 Mm Color : Plain White Packed In Plastic Pouch The Item Must Have Good Quality 25 Pcs Silver Platter Type: Steel Type Body Shape: Round Material: Stainless Steel Diameter: 300 -330 Mm Thickness: 1 - 2 Mm Packed In Plastic Pouch The Item Must Have Good Quality 50 Pc Soup Bowl Type: Plain With Two Handles Body Shape: Circular Material : Porcelain Capacity : 24 Oz. (minimum) Packed In Carton Box The Item Must Have Good Quality Packed In A Carton Box 25 Pc Soup Laddle Type: Steel Type Body Shape: Circular Material: Stainless Steel, Highly Polished Appearance Over-all Length : 220 -235 Mm Ladle Bowl Details : 60 -65 Mm Long, 60 -75 Mm Diameter, 10 -15 Mm Deep Handle Details : 145 - 155 Mm Long X 12 - 25 Mm Wide X 1.5 -3 Mm Thick Color : Silver With Hang Hole For Hanging And Easy Access 15 Pc Soup Tureen Type: Steel Body Shape: Round Material: Stainless Steel Capacity: 7 - 11 Quart Size : 60 X 35 X 32 Cm (minimum) Packed In Plastic Pouch The Item Must Have Good Quality 100 Pc Spoon, Dinner Type : Dessert Spoon Body Shape: Oval Material/appearance: Stainless Steel, Highly Polished With Plain Design Over-all Length : 175 To 190 Mm Thickness : 2 Mm - 3 Mm Shorter Handle : 120 -130 Mm Color : Silver Packed In Plastic Pouch The Item Must Have Good Quality 100 Pc Spoon, Dessert Type : Dessert Spoon Body Shape: Oval Material/appearance: Stainless Steel, Highly Polished With Plain Design Over-all Length : 175 To 190 Mm Thickness : 2 Mm - 3 Mm Shorter Handle : 120 -130 Mm Color : Silver Packed In Plastic Pouch The Item Must Have Good Quality 100 Pc Spoons, Service Type : Service Spoon Body Shape: Oval Material: Stainless Steel, Highly Polished, W/ Plain Design Over-all Length: 220 Mm - 250 Mm Width: 30 - 38 Mm Handle Thickness: 1.5 Mm - 4 Mm Handle Length - 165 Mm - 185 Mm Color: Silver Packed In Plastic Pouch The Item Must Have Good Quality 100 Pc Spoons, Soup (cream And Cosume) Type: Soup Spoon Body Shape: Round Material/appearance : Stainless Steel, Highly Polished, W/ Plain Design, Rounded Tip Handle Over-all Length : 165 Mm - 200 Mm Smaller Oval Shaped Spoon Bowl And Tapers Slightly To The Tip Shorter Handle : 110 Mm - 170 Mm Thickness : 1.5 Mm - 3 Mm Color : Silver Packed In Plastic Pouch 50 Pc Steak Knife Type: Steak Knife Body Shape: Flat With Serrated Edge Material: Stainless Steel Steel Blade With Wooden Handle Length: 170 Mm To 203 Mm Handle Wood Thickness: 10 - 14 Mm With Serrated Blade Packed In Carton Box The Item Must Have Good Quality 25 Pc Sugar Container Type: Glass Type Body Shape: Round Material: Glass With Brass Lid (or Equivalent) Diameter: 70 -80 Mm Height: 130 -140 Mm Capacity: 12 Oz. Packed In Carton Box The Item Must Have Good Quality 50 Pc Table Cloth, 54 X 54 Inches Type: Plain Cloth Body Shape: Square Material: Oxford Polyester Cloth Color: Plain White Dimension: L 54 Inches X W 54 Inches (minimum) Packed In Plastic Pouch The Item Must Have Good Quality 100 Pc Table Cloth, Rectangular Type: Plain Cloth Body Shape: Rectangle Material : Linen Size : 120cm X160cm (minimum) Color : Any Color But Not Black Feature: Washable Packed In A Plastic Pouch 100 Pc Table Napkins, Cloth, 16"x16" Type: Plain Cloth Body Shape: Square Material: Oxford Polyester Cloth Or Its Equivalent Size: L 16 Inches X W 16 Inches (minimum) Color: Plain White Packed In Plastic Pouch The Item Must Have Good Quality 80 Pcs Table Skirting Cloth 90" To 90" Type: Plain Cloth Body Shape: Square Material: American Cotton Twill Cloth Color: Any Color Except Black Dimension: 90 Inches X 90 Inches (minimum) Packed In Plastic Pouch The Item Must Have Good Quality 50 Pcs Table, Square/rectangular (4's Or 6's) Type: Foldable Plastic Body Shape: Square/rectangle Material: High Density Polyethylene Table Top Powder Coated Steel Frame Dimension: 37 - 39 X 37 - 39 Inches Color: White Good For 4 Persons Packed In Carton Box The Item Must Have Good Quality 20 Pcs Tea Pot, 2 Pints Type: Porcelain Type Body Shape: Round With Handle And Pouring Spout Material : Porcelain Capacity : (2 Pint) Color : White Packed In Carton Box The Item Must Be Of Good Quality 50 Pcs Teaspoon Type : Tea Spoon Body Shape: Oval Tip Material/appearance: Stainless Steel, Highly Polished, W/ Plain Design Over-all Length: 120 Mm To 140 Mm Handle Thickness: 2 Mm To 4 Mm Short Handle Length - 100 Mm (minimum) Color: Silver Packed In Plastic Pouch The Item Must Have Good Quality 15 Pcs Tong, 8 Inches Type: Tong, 8 Inches Body Shape: Standard Material: Stainless Steel Size: 8 Inches Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Tongs Lock Closed For Storage Preferably With A Packing Case Food Grade And Dishwasher-safe Must Be Branded 30 Pcs Tooth Pick Holder Type: Steel Type Body Shape: Round Material: Stainless Steel, Highly Polished In Appearance Diameter: 30 -35 Mm Diameter (minimum) Height: 65 -75 Mm Capacity: 1.24 Oz. (minimum) Packed In Plastic Pouch The Item Must Have Good Quality 20 Pcs Tray Stand Type: Foldable Body Shape: Rectangular Material: Chrome Plated Metal Folding Tray Stand Length: 470 -490 Mm Width: 400 -440 Mm Height: 770 -790 Mm Packed In Plastic Pouch The Item Must Have Good Quality 30 Pcs Tray, Bill Folders/change 1. Material : Heavy Duty Plastic ( Abs ) Or Its Equivalent 2. Height : 190 - 220 Mm 3. Width : 120 -140 Mm 4. Thickness : 2 Mm To 3 Mm (minimum) 5. Color : Black 6. With Check And Pen Holder 7. The Item Must Have Good Quality 8. Packed In Plastic Pouch 20 Pcs Tray, Round (bar) Type: Plastic Body Shape: Round Material: ( Pe/abs) Plastic Rubberized Surface, Non-slip/grip Tight Over-all Diameter: 345 -360 Mm (minimum) Thickness: 2 - 4 Mm (minimum) Color: Black Packed In Plastic Pouch The Item Must Have Good Quality 50 Pcs Water Goblet Type: Water Goblet Body Shape: Balloon-shaped Bowl Material: Crystal Clear Glass Over-all Length: 200 -220 Mm Capacity: 270 Ml To 300 Ml Rim Diameter - 55 -65 Mm Thickness: 1 Mm To 3 Mm Stem Length : 75 -85 Mm Stem Diameter : 6 -8 Mm Base Thickness : 3 -4 Mm Base Diameter : 7 -80 Mm Packed In Carton Box The Item Must Have Good Quality 30 Pcs Water Pitcher (stainless) Type: Steel Type Body Shape: Circular Material: Stainless Steel, Highly Polished Appearance Height: 170 Mm To 220 Mm Top Diameter: 110 -120 Mm (approximate) Capacity: 1 - 1.5 Liter With Pour Spout Dishwasher Safe Packed In Plastic Pouch The Item Must Have Good Quality Lot 8. Tangub City National High School (front Office Services And Local Guiding Services) Php 232,832.00 50 Pcs Calculator Type: Simple Calculator, Non Scientific Body Material: Hard Plastic Minimum Size: 110mm Width X 140mm Long Lcd Display: At Least Font Size Is 8mm X 5mm With Dual Power; Solar Cell And Battery With At Least 8 Digits Display Includes Spare Battery Packed With Protective Carton Box User's Manual In English Which Includes: A. Parts Manual With Labels, B. Assembly Instructions C. Operating Procedures On How To Use The Equipment, 1 Pcs Cart, Bell Boy Type:hotel Luggage Trolley Capacity: At Least 450 Kilograms Minimum Dimensions: Length - 1000mm X Width - 600mm X Height - 1700mm Frame Material: Stainless Steel Tubing Stainless Tube Diameter: At Least 35mm Black Powder Coated Steel Platform With Carpeted Surface And Rubber Bumper At The Edge With 4 Pieces X 200mm Diameter Black Pneumatic Swivel Wheels Packed With Shipping Carton Box Branded 1 Pcs Cash Register With Drawer Printer: Width: 57mm (minimum) Speed: 2 Lines/sec (minimum) Lcd Display Size: 5cm Width X 10cm Long(minimum) With Drawer At Least 4 Bills And 5 Coins Compartments With Drawer Dimension At Least 410mm Width X 450mm Depth Input Method: Numeric 10-key Interface With At Least 2 Ports Power Source: 220-240volts Ac, 50/60hz; With Ac/dc Adapter Can Be Operated With Battery Programmable User's Manual In English Which Includes: A. Parts Manual With Labels, 1 Pcs Credit Card Imprinter Height Of The Imprinter 2 1/2 Inch (minimum) X Width 5 1/2 Inch (minimum) X Length 11 Inches (minimum) Carriage Material: Steel Body:plastic Color: Black 20 Characters Per Line Card Mounting Can Accepts At Least 0.030" Thick Size Credit Cards Plate Can Accommodate Up To 5 Lines, Manual Type With User's Manual In English Which Includes: A. Parts Manual With Labels, B. Assembly Instructions, C. Operating Procedures 30 Pc Credit Card Voucher Holder Material: 3 Mm Thick Clear, Acrylic, Dimensions: Height: At Least 255 Mm, Width: At Least 210 Mm, Thickness: At Least 70 Mm 1 Pcs Detector, Fake Bills Led Display; Led Display Size: At Least 5 Cm Width X 10 Cm Long; Hard Plastic Casing; Ultraviolet (uv) And Magnetic (mg) Sensors; Power Source: Built In Rechargeable Battery,12v Output And Ac 100- 240v Adapter; With Complete Detection; Accessories Includes: Tough Plastic Carrying Case, Power Cord, Cleaning Brush, And Power Charger; User's Manual In English Which Includes: A. Parts Manual With Labels, B. Assembly Instructions, 3 Pcs Guest Folio Rack Material: Hard Plastic; Accommodates At Least 50 Room Divider Indexes; With Divider Boards With Metal Tabs; A4 Size Divider; With Metal Sidings 1 Pc Hypercom Memory: 1 Mb Ram (minimum) Lcd Display; 160 X 80 Pixel Graphics (minimum) With Card Reader Magnetic Stripe Pin Pad Port: 4-wire, Rs485; With Peripheral Ports For Pc Connection; Electronic Cash Register Or Journal Printer; With At Least 2400bps Modem; Support Synchronous (sdlc) And Asynchronous, Lan Operation; With Pin Encryption; With Thermal Printer At Least 576 Dots Per Line; Thermal Paper – 2 Inches Wide X 3 Inches Roll Diameter (min.); Keypad: Membrane, 12 Keys, Water-resistant; 1 Pc Key Card Maker With Verifier Set Of Hotel Door Lock System With Management Software; A) 1 Unit - Card Type Door Lock With Inductive Distance At Least 4cm B) 1 Unit - Card Encoder Unit With 25 Pieces Door Room Key Cards Computer Software System For Door Lock And Making Cards With Complete Accessories Including The Usb Type A Cable Interface To The Computer User's Manual In English Which Includes: A. Parts Manual With Labels, B. Assembly Instructions C. Operating Procedures On How To Use The Equipment 1 Pcs Key Rack Rack Material: Wood Number Of Racks: Can Accommodate At Least 40 Key Cards Minimum Rack Size: 70mm Width X 110mm Height Depth Of The Rack At Least 50mm Any Color Paint Type:wall Mounted Rack Pack With Shipping Carton Box 1 Pc Safety Deposit Box Vault Material: Metal, Powder Coated, Solid Steel Door Thickness: 4mm(minimum) Body Thickness: 2mm(minimum) Minimum Outer Dimension: L: 30cm X H: 20cm X W: 20cm Electronic Lock System Battery Operated Digital Panel: Requires 4 X ‘aa’ Batteries User's Manual In English Which Includes: A. Parts Manual With Labels, B. Assembly Instructions, C. Operating Procedures On How To Use The Equipment, Branded 20 Pcs Speaker, Lapel Frequency At Least 500mhz With Audio Input Connector With Operation Range At Least 50meters Receiver/70ma Earphone Output Level: 32ohm, 65mw Operates With Energizer Battery With Minimum Powerconsumption Of Transmitter At Least 3v/70ma Receiver: 3v/70ma 25 Sets First Aid Kit Type: Emergency Case; Contents: First Aid Quick Reference Guide, 1pc; Sterize Gauge Swab(4 X4 X12 Ply) 100 Pcs/pack, 1 Pack; Adhesive Strips/band -aid, 50 Pcs/pack, 2 Packs; Gloves, Disposable, Medium Size, 2 Pairs; Hypo Allergenic Adhesive Tape, 5cm X 5cm, 2 Rolls; Triangular Bandage/arm Sling, Min 90cm X 90cmx 120cm, 2pcs; Safety Pins, 1 1/4 Inches, (12 Pcs), 1 3/4 Inches (12 Pcs); Stainless Steel Bandage Scissors, 2pcs; Betadine, 60ml, 2 -3 Years Expiration, 2 Bottles; Dust Mask, 2pcs; Hand Towels Or Face Towels, White Color, 6 Pcs; Gauze Bandage, Minimum 5cm X 4cm, 2 Rolls; Antiseptic Handwash/germicidal Soap, 60 Gms , 2pcs; Torniquet, 2 Pcs; Spirit Of Ammonia, 30ml, 2-3 Years Expiration, 1 Bottle; Burn Cream Ointment, 20g To 30g, 2- 3years Expiration, 1 Tube; Medical Tweezers Min. 8cm, Plastic, 2pcs; Plastic Bags, Resealable, Minimum Of 24pcs, 100mm X 180mm, 24pcs, 150mm X 230mm Cotton Balls , 50 Balls In A Sealed Package, 2 Packs Hot And Cold Pack, Reuseable, 1 Pack Water Resistant And Sturdy Case W/ Handle That Can Accommodate All The Listed Items. 4 Pcs Megaphone Battery Operated (4 Pcs - Size D Battery) With Built-in Siren Power Output: 20-watts (minimum) Range: 700 Meters (minimum) With Hand Grip And Carrying Strap Branded With Users Manual That Contains The Specification, List Of Parts, Instruction Guide, Troubleshooting, Safety Instruction. 100 Pcs Whistle Anodized Aluminum;size : Length - 6.5cm X 3cm Diameter; Handy And Lightweight; Loud Whistle Can Be Heard For Far Distance Of 100 Meters; With Key Ring For Attachment 2 Pcs White Board, Floor Standing, Rolling Board: White Formica Laminated, Plane Will Not Deform.board Size: Rectangular 1800mm W X 1000 To 1200mm H, Board Edges Secured With Aluminum Clip Edging 17 Mm (minimum) Wih Plastic Corner Capscomes With Metal Tray For Marker And Eraserthe Stand And Frame Are Constructed With Aluminum Or Powder Coated Steel 25mm Square Tube (minimum), Sturdy, No Wobblewith 4 Lockable Hard Plastic Caster Wheelsoverall Height From Floor: 210 To 214cmsmooth Surface, No Sharp Edges Total Abc 3,978,106.00 2. The Department Of Education – Division Of Tangub City Now Invites Bids For The Above Procurement Project. Procurement Of Learning Tools And Equipment For Technical Vocational Livelihood To Deped-public Schools. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information From Department Of Education – Division Of Tangub City And Inspect The Bidding Documents At The Address Given Below From 8:00 A.m. To 5:00 P.m. , Mondays To Fridays Except Holidays. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 14, 2024 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of: Lot 1 - Five Hundred Pesos (p500.00) Lot 2 - Five Hundred Pesos (p500.00) Lot 3 - Five Hundred Pesos (p500.00) Lot 4 – One Thousand Pesos (p1,000.00) Lot 5 - Five Thousand Pesos (p5,000.00) Lot 6 - Five Hundred Pesos (p500.00) Lot 7 – One Thousand Pesos (p1,000.00) Lot 8 - Five Hundred Pesos (p500.00) The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees To Be Presented In Person. 6. The Department Of Education – Division Of Tangub City Will Hold A Pre-bid Conference On November 21, 2024, 9:00 Am At Division Office Conference Hall Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before 9:00 A.m. On December 3, 2024. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be December 3, 2024, 9:00 A.m. At The Given Address Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. Bidders Or Its Authorized Representatives Are Encouraged To Attend The Pre-bid Conference To Ensure That They Fully Understand The Procuring Entity’s Requirements. 11. The Department Of Education – Division Of Tangub City Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Gina L. Mandawe Head, Bac Secretariat Deped, Division Of Tangub City, Anecito Siete St., Mantic, Tangub City 7214 (088) 530-5988 Depedtangub.bacsec@deped.gov.ph Https://tangub.deped.gov.ph/ 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Https://tangub.deped.gov.ph/ Erlinda G. Dael, Phd., Cese Assistant Schools Division Superintendent Bac Chair
Closing Date3 Dec 2024
Tender AmountPHP 3.9 Million (USD 67.4 K)

Department Of Education Region Ii Tender

Education And Training Services
Corrigendum : Closing Date Modified
Philippines
Details: Description Invitation To Bid Supply And Door-to-door Delivery Of Supplementary Learning Resources (slrs) For Sdo/school Library Hubs Of Deped Region 2 1. The Department Of Education Regional Office Ii, Intends To Apply The Sum Of One Hundred Thirty-two Million Three Hundred Thirty-two Thousand Pesos And 58/100 (p132,332,000.58) Being The Abc To Payments Under The Contract For The Procurement Of Goods: Supply And Door-to-door Delivery Of Supplementary Learning Resources (slrs) For Sdo/school Library Hubs Of Deped Region 2. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Education Regional Office Ii Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By Sixty (60) Calendar Days Per Lot. Bidders Should Have Completed, Within Five Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Department Of Education Regional Office Ii And Inspect The Bidding Documents At The Address Given Below During Office Hours. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On October 31 – November 19, 2024 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee Of: Lot No. Bidding Documents Fee 1 P 5,000.00 2 P 10,000.00 3 P 10,000.00 4 P 10,000.00 5 P 25,000.00 6 P 25,000.00 7 P 5,000.00 8 P 25,000.00 9 P 10,000.00 10 P 5,000.00 11 P 5,000.00 12 P 1,000.00 13 P 5,000.00 14 P 10,000.00 1-14 P 50,000.00 For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees To Be Presented In Person Or Through Email At Bac.region2@deped.gov.ph. For The Reference Of Interested Bidders, Payment Of Bidding Documents May Be Resorted Through Online Bank Transfer Via The Following Bank Details: A. Account Name: Deped Trust Fund B. Account Number: 3702-1011-65 C. Current Account D. Landbank Of The Philippines – Capitol Branch, Tuguegarao City 6. The Department Of Education Regional Office Ii Will Hold A Pre-bid Conference On November 7, 2024, 9:00 Am At The Main Conference Hall, Deped Tuguegarao City, Cagayan Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Main Conference Hall, Deped Regional Office No. 2, Tuguegarao City, Cagayan On Or Before November 19, 2024 At 8:59 Am. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On November 19, 2024 At 9:00 Am Main Conference Hall, Deped Regional Office No. 2, Tuguegarao City, Cagayan. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. Procurement Of Goods: Supply And Door-to-door Delivery Of Supplementary Learning Resources (slrs) For Sdo/school Library Hubs Of Deped Region 2 Shall Include The Following: Lot No. Unit Item Description/ Book Title Quantity Unit Cost Approved Budget Of The Contract Lot 1 1 Pc Sra Reading Laboratory 2020 Edition 21 ₱75,000.00 P1,575,000.00 2 Pc Sra Reading Laboratory Power Builders 1a-1f 20 ₱14,990.00 299,800.00 Sub-total Lot 1 41 P1,874,800.00 Lot 2 1 Pc Ako Ang Bayan 30 ₱250.00 7,500.00 2 Pc Alamat Ng Ampalaya 100 ₱349.00 34,900.00 3 Pc Alon And Lila's Last Summer Before Doomsday 650 ₱399.00 259,350.00 4 Pc Ang Aking Mukha (board Book) 100 ₱199.00 19,900.00 5 Pc Ang Aking Pamayanan 50 ₱349.00 17,450.00 6 Pc Ang Aking Pamayanan (board Book) 100 ₱199.00 19,900.00 7 Pc Ang Alamat Ng Palay 100 ₱150.00 15,000.00 8 Pc Ang Barumbadong Bus 130 ₱349.00 45,370.00 9 Pc Ang Hukuman Ni Sinukuan (bp) 150 ₱150.00 22,500.00 10 Pc Ang Kaibigan Kong Si Mabini 100 ₱199.00 19,900.00 11 Pc Ang Kamatis Ni Peles 100 ₱349.00 34,900.00 12 Pc Ang Mabait Na Kalabaw 130 ₱349.00 45,370.00 13 Pc Ang Madyik Silya Ni Titoy (bp) 130 ₱150.00 19,500.00 14 Pc Ang Mahiwagang Habihan 560 ₱150.00 84,000.00 15 Pc Ang Maliit Na Kalabaw (board Book) 50 ₱199.00 9,950.00 16 Pc Ang Maraming Ngalan Ni Emilio 100 ₱199.00 19,900.00 17 Pc Ang Paaralan Ni Fuwan 130 ₱150.00 19,500.00 18 Pc Ang Pambihirang Buhok Ni Raquel 250 ₱150.00 37,500.00 19 Pc Ang Pamilya Namin (board Book) 100 ₱199.00 19,900.00 20 Pc Ang Una Kong Alpabeto (board Book) 50 ₱199.00 9,950.00 21 Pc Anina Ng Mga Alon 131 ₱250.00 32,750.00 22 Pc Bakawan 50 ₱349.00 17,450.00 23 Pc Bakit Matagal Ang Sundo Ko? 100 ₱349.00 34,900.00 24 Pc Bayan Ng Basura 150 ₱150.00 22,500.00 25 Pc But That Wont Wake Me Up 50 ₱150.00 7,500.00 26 Pc Can We Live On Mars? 100 ₱199.00 19,900.00 27 Pc Can We Live Without Trees 30 ₱199.00 5,970.00 28 Pc Dalawang Bayani Ng Bansa 130 ₱150.00 19,500.00 29 Pc Dumaan Si Butiki 200 ₱349.00 69,800.00 30 Pc Dumaan Si Butiki (board Book) 50 ₱349.00 17,450.00 31 Pc El Filibusterismo 80 ₱299.00 23,920.00 32 Pc Estrellita, The Little Wishing Star 150 ₱150.00 22,500.00 33 Pc Gustong Mag-aral Ni Sula 30 ₱150.00 4,500.00 34 Pc Haluhalo (board Book) 50 ₱349.00 17,450.00 35 Pc Hati Tayo! 1,130 ₱199.00 224,870.00 36 Pc Hati Tayo! (board Book) 100 ₱199.00 19,900.00 37 Pc Hating Kapatid 250 ₱150.00 37,500.00 38 Pc How Long Till September 100 ₱150.00 15,000.00 39 Pc Ibabaw At Ilalim 100 ₱349.00 34,900.00 40 Pc Iba't Ibang Lasa 100 ₱349.00 34,900.00 41 Pc Iba't Ibang Lasa (board Book) 50 ₱199.00 9,950.00 42 Pc Isa, Dalawa, Tatlo! (board Book) 100 ₱199.00 19,900.00 43 Pc Isang Bayabas, Pito Ang Butas (board Book) 100 ₱199.00 19,900.00 44 Pc Josefina (graphic Literature) 100 ₱350.00 35,000.00 45 Pc Just Add Dirt 800 ₱150.00 120,000.00 46 Pc Kain Tayo! (board Book) 100 ₱199.00 19,900.00 47 Pc Kakanin! (board Book) 50 ₱349.00 17,450.00 48 Pc Kalambing 1,150 ₱150.00 172,500.00 49 Pc Kaliwa At Kanan (board Book) 100 ₱199.00 19,900.00 50 Pc Kulay! (board Book) 50 ₱199.00 9,950.00 51 Pc Kung May Dinosaur Sa Kamalig Ni Lolo 1,150 ₱349.00 401,350.00 52 Pc Laon And The 7-headed Dragon 130 ₱150.00 19,500.00 53 Pc Leron, Leron, Sinta (board Book) 100 ₱199.00 19,900.00 54 Pc Magtanim Ay Di Biro (board Book) 100 ₱199.00 19,900.00 55 Pc Mahabang-mahabang-mahaba 200 ₱150.00 30,000.00 56 Pc Makinang Makinang 1,240 ₱150.00 186,000.00 57 Pc Mars, May Zombie! 131 ₱599.00 78,469.00 58 Pc Masaya Ako! 100 ₱349.00 34,900.00 59 Pc Masaya Pala! (board Book) 100 ₱199.00 19,900.00 60 Pc May Sampung Pulang Langgam 50 ₱349.00 17,450.00 61 Pc Mga Araw Ng Linggo (board Book) 100 ₱199.00 19,900.00 62 Pc Mga Bahagi Ng Katawan (board Book) 100 ₱199.00 19,900.00 63 Pc Mga Hayop Sa Pilipinas (board Book) 50 ₱199.00 9,950.00 64 Pc Mga Hugis Sa Aming Bahay 100 ₱349.00 34,900.00 65 Pc Mga Hugis Sa Aming Bahay (board Book) 50 ₱199.00 9,950.00 66 Pc Mga Lagay Ng Panahon (board Book) 100 ₱199.00 19,900.00 67 Pc Mga Tala Sa Dagat 50 ₱250.00 12,500.00 68 Pc My Ghost, Where'd You Go? (graphic Literature) 100 ₱299.00 29,900.00 69 Pc Nemo, Ang Batang Papel 1,232 ₱150.00 184,800.00 70 Pc Ngumiti Si Andoy 303 ₱150.00 45,450.00 71 Pc Noli Me Tangere 80 ₱299.00 23,920.00 72 Pc Papa's House, Mama's House 150 ₱150.00 22,500.00 73 Pc Papel De Liha 50 ₱349.00 17,450.00 74 Pc Patulog Na Ba Kayo? 180 ₱199.00 35,820.00 75 Pc Salamat Po! 130 ₱199.00 25,870.00 76 Pc Si Janus Silang At Ang Hiwagang May Dalawang Mukha 150 ₱349.00 52,350.00 77 Pc Si Janus Silang At Ang Labanang Manananggal -mambabarang 261 ₱299.00 78,039.00 78 Pc Si Janus Silang At Ang Labanang Manananggal-mambabarang (manga0 100 ₱450.00 45,000.00 79 Pc Si Janus Silang At Ang Lihim Ng Santinakpan 281 ₱699.00 196,419.00 80 Pc Si Janus Silang At Ang Pitumpu't Pitong Puso 281 ₱299.00 84,019.00 81 Pc Si Janus Silang At Ang Tiyanak Ng Tabon 180 ₱249.00 44,820.00 82 Pc Si Janus Silang At Ang Tiyanak Ng Tabon Ikasampung Anibersaryong Edisyon 145 ₱699.00 101,355.00 83 Pc Si Janus Silang At Ang Hiwagang May Dalawang Mukha 131 ₱349.00 45,719.00 84 Pc Si Pilong Patago-tago 50 ₱349.00 17,450.00 85 Pc Sina Ana At Maya (board Book) 100 ₱199.00 19,900.00 86 Pc Sorry Po! 130 ₱199.00 25,870.00 87 Pc What Kids Should Know About Filipino Food 100 ₱199.00 19,900.00 88 Pc What Kids Should Know About Filipino Musical Instruments 100 ₱199.00 19,900.00 89 Pc What Kids Should Know About Filipino Visual Arts 100 ₱199.00 19,900.00 90 Pc Wikahon A: Pahagdang Pagtuturo Sa Filipino (box) 6 ₱14,995.00 89,970.00 91 Pc Wikahon B: Pahagdang Pagtuturo Sa Filipino (box) 6 ₱17,495.00 104,970.00 92 Pc Wikahon Pre-a: Pahagdang Pagtuturo Sa Filipino (box) 6 ₱9,995.00 59,970.00 Learning Area References 1 Pc Ako Ang Bayan 50 ₱250.00 ₱12,500.00 2 Pc Alon And Lila's Last Summer Before Doomsday 500 ₱399.00 ₱199,500.00 3 Pc Ang Unang Barangay 99 ₱150.00 ₱14,850.00 4 Pc Anina Ng Mga Alon 50 ₱250.00 ₱12,500.00 5 Pc Araw Ng Mga Ina 80 ₱150.00 ₱12,000.00 6 Pc Can We Cool Down The Earth? 680 ₱199.00 ₱135,320.00 7 Pc Can We Live Without Trees 50 ₱199.00 ₱9,950.00 8 Pc El Filibusterismo 50 ₱299.00 ₱14,950.00 9 Pc Florante At Laura 650 ₱199.00 ₱129,350.00 10 Pc Gustong Mag-aral Ni Sula 50 ₱150.00 ₱7,500.00 11 Pc Hati Tayo! 50 ₱199.00 ₱9,950.00 12 Pc Himagsikang 1896 600 ₱350.00 ₱210,000.00 13 Pc Ibong Adarna 50 ₱250.00 ₱12,500.00 14 Pc Mga Nilalang Na Kagila-gilalas 80 ₱299.00 ₱23,920.00 15 Pc Mga Salitang-kilos 80 ₱199.00 ₱15,920.00 16 Pc Noli Me Tangere 50 ₱299.00 ₱14,950.00 17 Pc Pista Na 80 ₱150.00 ₱12,000.00 18 Pc Salamat Po! 50 ₱199.00 ₱9,950.00 19 Pc Sampung Magkakaibigan 50 ₱349.00 ₱17,450.00 20 Pc Sorry Po! 50 ₱199.00 ₱9,950.00 21 Pc Una And Miguel 600 ₱250.00 ₱150,000.00 22 Pc What Kids Should Know About Andres And The Katipunan 50 ₱199.00 ₱9,950.00 23 Pc What Kids Should Know About Filipino Architecture(2nd Edition) 601 ₱199.00 ₱119,599.00 24 Pc What Kids Should Know About Filipino Food(2nd Edition) 600 ₱199.00 ₱119,400.00 25 Pc What Kids Should Know About Filipino Musical Instruments 680 ₱199.00 ₱135,320.00 26 Pc What Kids Should Know About Filipino Visual Arts 600 ₱199.00 ₱119,400.00 27 Pc What Kids Should Know About Filipino Food 80 ₱199.00 ₱15,920.00 28 Pc What Kids Should Know About Filipino Visual Arts 80 ₱199.00 ₱15,920.00 29 Pc Wikahon Pre-a: Pahagdang Pagtuturo Sa Filipino (box) 9 ₱9,995.00 ₱89,955.00 30 Pc Wikahon A: Pahagdang Pagtuturo Sa Filipino (box) 8 ₱14,995.00 ₱119,960.00 31 Pc Wikahon B: Pahagdang Pagtuturo Sa Filipino (box) 8 ₱17,495.00 ₱139,960.00 Sub-total – Lot 2 23709 ₱6,175,874.00 Lot 3 1 Pc Brain Talking And Mathematics And Brain Talking Science W/ Learn English-filipino Dictionary And Grammar With Pictures 61 ₱39,850.00 ₱2,430,850.00 2 Pc Manipulative Toys For Developing Numeracy Skills For Young Learners 90 10,000.00 900,000.00 3 Pc New Encyclopedia Of Knowledge - Continents And Countries 1 10,098.00 10,098.00 4 Pc New Encyclopedia Of Knowledge - Human Body 1 10,098.00 10,098.00 5 Pc New Encyclopedia Of Knowledge - Inventions And Discoveries 1 10,098.00 10,098.00 6 Pc New Encyclopedia Of Knowledge - Mysteries Of The Sea 1 10,098.00 10,098.00 7 Pc New Encyclopedia Of Knowledge - Ocean And Seas 59 10,098.00 595,782.00 8 Pc Social And Pretend Play Manipulative Toys For Yong Learners 90 10,000.00 900,000.00 9 Pc Visual Perceptual Manipulative Toys For Young Learners 90 10,000.00 900,000.00 Sub-total – Lot 3 394 ₱5,767,024.00 Lot 4 1 Pc A Blue Kind Of Day 130 ₱1,118.00 145,340.00 2 Pc A Little Emotional 180 ₱1,238.00 222,840.00 3 Pc Beautiful Country 580 ₱778.00 451,240.00 4 Pc Brown Girls 480 ₱1,108.00 531,840.00 5 Pc Fashionopolis 430 ₱1,118.00 480,740.00 6 Pc Hattie Harmony:worry Detective 180 ₱1,048.00 188,640.00 7 Pc Here 30 ₱1,178.00 35,340.00 8 Pc Joseph Had A Little Overcoat 631 ₱528.00 333,168.00 9 Pc Last Night At The Telegraph Club 420 ₱1,138.00 477,960.00 10 Pc Fashionopolis 50 ₱1,118.00 55,900.00 11 Pc Mouseboat 30 ₱1,178.00 35,340.00 12 Pc Mouseboat 150 ₱1,178.00 176,700.00 13 Pc Our Missing Hearts 680 ₱1,808.00 1,229,440.00 14 Pc The Westing Game 580 ₱658.00 381,640.00 15 Pc Watercress 680 ₱1,138.00 773,840.00 16 Pc Worn 480 ₱1,118.00 536,640.00 17 Pc Disaster And Mental Health 1595 ₱395.00 630,025.00 18 Pc Ethics, 2nd Edition 1095 ₱495.00 542,025.00 19 Pc Gender & Society: Fostering A Gender Equal Society. 2nd Ed. 2148 ₱595.00 1,278,060.00 20 Pc Understanding The Self 605 ₱395.00 238,975.00 Sub-total – Lot 4 11,154 P8,745,693.00 Lot 5 1 Pc A Crocodile And A Whale 2550 468.00 1,193,400.00 2 Pc A Party For Brown Mouse 2050 468.00 959,400.00 3 Pc A Tale Of Two Cities 1450 1,404.00 2,035,800.00 4 Pc Ang Tagatiktik Ng Bato (the Rock Beater) 50 645.95 32,297.50 5 Pc Bingo's Birthday 2500 468.00 1,170,000.00 6 Pc Hunchback Of Notre Dame 2000 1,404.00 2,808,000.00 7 Pc Jolly Roger And The Treasure 2050 468.00 959,400.00 8 Pc Little Women 2500 1,404.00 3,510,000.00 9 Pc Look Out For Bingo 2050 468.00 959,400.00 10 Pc Max And The Little Plant 1900 468.00 889,200.00 11 Pc Mga Kahanga-hangang Halamang Gamot (amazing Herbs) 50 645.95 32,297.50 12 Pc Panghihiram Ng Palaso Sa Pamamagitan Ng Maliliit Na Bangka (borrowing Arrows With Thatched Boats) 50 645.95 32,297.50 13 Pc Sumanib Si Mulan Sa Hukbo (mulan Joins The Army) 50 645.95 32,297.50 14 Pc The Adventure Of Huckleberry Finn 1985 1,404.00 2,786,940.00 15 Pc The Count Of Monte Cristo 1650 1,404.00 2,316,600.00 16 Pc A Christmas Carol 2650 1,404.00 3,720,600.00 Sub-total – Lot 5 25,535 P23,437,930.00 Lot 6 1 Pc A Tale Of Two Cities 50 ₱249.75 12,487.50 2 Pc Aklat Ng Halagahan: Bayanihan Para Kay Umang (bigbook) 50 ₱270.00 13,500.00 3 Pc Ako Ay Isang Mabuting Pilipino 2,760 ₱199.75 551,310.00 4 Pc Ako Ay May Kiki (smallbook) 650 ₱199.75 129,837.50 5 Pc Ako Ay May Kiki (bigbook) 600 ₱299.75 179,850.00 6 Pc Ako Ay May Titi (bigbook) 600 ₱299.75 179,850.00 7 Pc Ako Ay May Titi (smallbook) 600 ₱199.75 119,850.00 8 Pc Akoy Masayang Masaya 2,660 ₱270.00 718,200.00 9 Pc Alice's Adventures In Wonderland 50 ₱249.75 12,487.50 10 Pc Sa Piling Ni Nanay (bigbook) 50 ₱299.75 14,987.50 11 Pc Alkansya Ni Lolong (bigbook) 2,117 ₱270.00 571,590.00 12 Pc Ang Alaga Kong Lolo 400 ₱199.75 79,900.00 13 Pc Ang Alaga Kong Lolo (big Book) 400 ₱299.00 119,600.00 14 Pc Ang Alamat Ng Palay 2,725 ₱199.75 544,318.75 15 Pc Ang Ampalaya Sa Pinggan Ni Peepo (small Book) 2,738 ₱199.75 546,915.50 16 Pc Ang Ampalaya Sa Pinggan Ni Peepo(big Book) 2,025 ₱299.75 606,993.75 17 Pc Ang Batang Galit Sa Lamok 2,755 ₱199.75 550,311.25 18 Pc Ang Batang Nagsinungaling Tungkol Sa Lobo 90 ₱270.00 24,300.00 19 Pc Ang Batang Laging Tumitingin Sa Sapatos Ng Mga Tao 50 ₱199.75 9,987.50 20 Pc Ang Batang Papet(big Book) 550 ₱299.75 164,862.50 21 Pc Super Woman Si Inay (big Book) 50 ₱299.75 14,987.50 22 Pc Ang Batang Ulap (big Book) 1,675 ₱270.00 452,250.00 23 Pc Ang Bisita Ni Lolo Lino 50 ₱199.75 9,987.50 24 Pc Ang Daga At Ang Leon (bigbook) 90 ₱270.00 24,300.00 25 Pc Ang Huling Puno 2,675 ₱199.75 534,331.25 26 Pc Ang Kumot Ni Dora 1,050 ₱199.75 209,737.50 27 Pc Ang Langgam At Ang Tipaklong (bigbook) 90 ₱270.00 24,300.00 28 Pc Ang Lihim Sa Tore Ng Sinagtala 50 ₱249.75 12,487.50 29 Pc Ang Limang Tuta (bigbook) 2,075 ₱270.30 560,872.50 30 Pc Ang Lumang Aparador Ni Lola 50 ₱199.75 9,987.50 31 Pc Ang Lumang Makina Ni Lola Mina 50 ₱199.75 9,987.50 32 Pc Ang Madyik Ni Paolo 1,050 ₱199.75 209,737.50 33 Pc Ang Magalang Na Dyip (bigbook) 2,075 ₱270.00 560,250.00 34 Pc Ang Magic Bahag 1,625 ₱199.75 324,593.75 35 Pc Ang Mahahabang Tainga Ng Tatlong Lola 1,100 ₱199.75 219,725.00 36 Pc Ang Mahiwagang Bag Ni Mama 550 ₱199.75 109,862.50 37 Pc Ang Malinis Na Malmag (bigbook) 2,075 ₱270.00 560,250.00 38 Pc Ang Nag - Iisa At Natatanging Si Onyok 50 ₱260.00 13,000.00 39 Pc Ang Nanay Kong Drayber (bigbook) 450 ₱299.75 134,887.50 40 Pc Ang Pagong At Ang Matsing (bigbook) 180 ₱270.00 48,600.00 41 Pc Ang Pagong At Ang Kuneho (bigbook) 400 ₱270.00 108,000.00 42 Pc Ang Pangat, Ang Lupang Ninuno, At Ang Ilog 1,163 ₱199.75 232,309.25 43 Pc Ang Pangit Ng Inakay (bigbook) 490 ₱270.00 132,300.00 44 Pc Ang Payong Na Takot Sa Ulan 550 ₱199.75 109,862.50 45 Pc Ang Punong Marikit. 90 ₱149.75 13,477.50 46 Pc Ang Sakim Na Aparador 50 ₱199.75 9,987.50 47 Pc Ang Singsing-pari Sa Pisara 1,050 ₱199.75 209,737.50 48 Pc Ang Supremo At Ang Kuweba 90 ₱199.75 17,977.50 49 Pc Ang Tsinelas Ni Inoy = Inoy's Slippers 500 ₱199.75 99,875.00 50 Pc Around The World In Eighty Days 50 ₱249.75 12,487.50 51 Pc Angelica Ang Multo Ng Balete Drive 550 ₱269.75 148,362.50 52 Pc Ang Usok At Si Daddy 2,838 ₱199.75 566,890.50 53 Pc Baklas-antolohiya Ng Mga Radikal Na Kuwentong Pambata 370 ₱339.75 125,707.50 54 Pc Bayanihan Para Kay Umang 2,225 ₱270.00 600,750.00 55 Pc Black Beauty 50 ₱249.75 12,487.50 56 Pc Burnay, Ang Batang Palayok 1,190 ₱199.75 237,702.50 57 Pc Og Uhog 150 ₱199.75 29,962.50 58 Pc A Lesson From Juana 950 ₱199.75 189,762.50 59 Pc Ang Alkemista 50 ₱299.75 14,987.50 60 Pc Dalawa Kami Ni Lola 50 ₱199.75 9,987.50 61 Pc Dear Nanay 480 ₱199.75 95,880.00 62 Pc Dracula 50 ₱249.75 12,487.50 63 Pc Florante At Laura 140 ₱199.75 27,965.00 64 Pc God Talks About Me With Thankfulness 140 ₱149.75 20,965.00 65 Pc Good Habits (health) 1,625 ₱129.75 210,843.75 66 Pc Good Habits (nutrition) 1,575 ₱129.75 204,356.25 67 Pc Green Luntian 1,150 ₱199.75 229,712.50 68 Pc Gustong Maging Pintor Ni Kuting 400 ₱270.00 108,000.00 69 Pc Hulagpos: Antolohiya Ng Mga Radikal Na Kuwento 50 ₱259.75 12,987.50 70 Pc Illustrated Classics: Around The World In Eighty Days 550 ₱249.75 137,362.50 71 Pc Illustrated Classics: The Jungle Book 550 ₱249.75 137,362.50 72 Pc Illustrated Classics: Treasure Island 550 ₱249.75 137,362.50 73 Pc Inhale, Exhale 30 ₱199.75 5,992.50 74 Pc Isang Daang Taong Pag Iisa 50 ₱449.75 22,487.50 75 Pc Isang Magandang Umaga (big Book) 2,125 ₱270.00 573,750.00 76 Pc Joseng Dalag . 90 ₱149.75 13,477.50 77 Pc Journey To The Center Of The Earth 50 ₱249.75 12,487.50 78 Pc Karera Para Sa Kalusugan 3,125 ₱149.75 467,968.75 79 Pc Kidnapped 50 ₱249.75 12,487.50 80 Pc Kiko Kitikiti 500 ₱299.75 149,875.00 81 Pc King Arthur And The Legends Of The Round Table 50 ₱249.75 12,487.50 82 Pc Lampara Classic - White Fang 50 ₱299.75 14,987.50 83 Pc Lampara Classic-the Call Of The Wild 50 ₱199.75 9,987.50 84 Pc Lampara World Classic - The Nightingale 50 ₱199.75 9,987.50 85 Pc Little Life Lesson On Anger 140 ₱149.75 20,965.00 86 Pc Little Life Lesson On Perseverance 140 ₱149.75 20,965.00 87 Pc Little Life Lesson On Sharing 140 ₱149.75 20,965.00 88 Pc Lola Lola 1,050 ₱199.75 209,737.50 89 Pc Luntian Ang Bungang May Pakpak 2,725 ₱199.75 544,318.75 90 Pc Mahahabang Tainga Ng Tatlong Lola 500 ₱199.75 99,875.00 91 Pc Mamay Esing 90 ₱199.75 17,977.50 92 Pc Mahal Ko Ang Pilipinas 2,225 ₱270.00 600,750.00 93 Pc Masaya Maging Ako (big Book) 400 ₱299.75 119,900.00 94 Pc May Gadget Ako, May Libro Ako (big Book) 400 ₱270.00 108,000.00 95 Pc May Monster Si Kuya 2,725 ₱199.75 544,318.75 96 Pc Mga Batang Poz 1,675 ₱349.75 585,831.25 97 Pc Mga Damdamin Ni Butanding (bigbook) 2,625 ₱270.00 708,750.00 98 Pc Mga Premyadong Kuwentong Pambata : Saturday Morning In The Garden 50 ₱199.75 9,987.50 99 Pc Mga Premyadong Kuwentong Pambata : Si Andoy , Batang Tondo 50 ₱199.75 9,987.50 100 Pc Mga Premyadong Kuwentong Pambata : A Thousand Paper Cranes 50 ₱199.75 9,987.50 101 Pc Mga Premyadong Kuwentong Pambata : Ang Singsing - Pari Sa Pisara 50 ₱199.75 9,987.50 102 Pc Mga Premyadong Kuwentong Pambata : Ang Supremo At Ang Kuweba 50 ₱199.75 9,987.50 103 Pc Mga Premyadong Kuwentong Pambata : Gaano Ba Kalayo Patungong Paaralan 50 ₱199.75 9,987.50 104 Pc Mga Premyadong Kuwentong Pambpari Sa Pisaraata: Ang Singsing 500 ₱199.75 99,875.00 105 Pc Mga Sagisag Ng Pilipinas 2,225 ₱270.00 600,750.00 106 Pc Misteryo! 550 ₱199.75 109,862.50 107 Pc Moymoy Lulumboy 1 : Ang Batang Aswang 2,125 ₱219.75 466,968.75 108 Pc Moymoy Lulumboy 2 : Ang Nawawalang Birtud 3,175 ₱259.75 824,706.25 109 Pc Moymoy Lulumboy 3 : Ang Paghahanap Kay Inay 3,175 ₱249.75 792,956.25 110 Pc Moymoy Lulumboy 4 : Ang Dulot Ng Digmaan 2,125 ₱249.75 530,718.75 111 Pc Moymoy Lulumboy 5: Ang Lihim Ng Libro 500 ₱269.75 134,875.00 112 Pc Moymoy Lulumboy 6: Ang Ugat At Ang Propesiya 500 ₱259.75 129,875.00 113 Pc Naging Leon Si Kuting (big Book) 400 ₱270.00 108,000.00 114 Pc Og Uhog 90 ₱199.75 17,977.50 115 Pc Pag Ibig Sa Panahon Ng Kolera 1,058 ₱429.75 454,675.50 116 Pc Pibo 662 ₱199.75 132,234.50 117 Pc Piglas-antolohiya Ng Mga Radikal Na Kuwento 1,100 ₱339.75 373,725.00 118 Pc Pitong Alitaptap 2,225 ₱270.00 600,750.00 119 Pc May Gadget Ako, May Libro Ako (big Book) 50 ₱270.00 13,500.00 120 Pc Premyadong Kuwentong Pambata - Ako Ay Isang Apol 50 ₱199.75 9,987.50 121 Pc Premyadong Kuwentong Pambata - Alamat Ng Duhat 50 ₱199.75 9,987.50 122 Pc Premyadong Kuwentong Pambata - Ang Kumot Ni Dora 50 ₱199.75 9,987.50 123 Pc Premyadong Kuwentong Pambata - Ang Madyik Ni Paolo 50 ₱199.75 9,987.50 124 Pc Premyadong Kuwentong Pambata - Ang Mahiwagang Manok Ni Menggay 50 ₱199.75 9,987.50 125 Pc Premyadong Kuwentong Pambata - Ang Pangat, Ang Lupang Ninuno, At Ang Ilog 50 ₱199.75 9,987.50 126 Pc Premyadong Kuwentong Pambata - Ang Riles Sa Tiyan Ni Tatay 50 ₱199.75 9,987.50 127 Pc Premyadong Kuwentong Pambata - Ang Tatlong Bubwit At Ang Bangkang Marikit 50 ₱199.75 9,987.50 128 Pc Premyadong Kuwentong Pambata - Ang Tsinelas Ni Inoy 50 ₱199.75 9,987.50 129 Pc Premyadong Kuwentong Pambata - Junior 50 ₱199.75 9,987.50 130 Pc Premyadong Kuwentong Pambata - Kung Paano Nanalo Si Rosang Taba Sa Isang Karera 50 ₱199.75 9,987.50 131 Pc Premyadong Kuwentong Pambata - Lola - Lola 50 ₱199.75 9,987.50 132 Pc Premyadong Kuwentong Pambata - Lumang Kumot Ni Lola 50 ₱199.75 9,987.50 133 Pc Premyadong Kuwentong Pambata - Sa Tapat Ng Tindahan Ni Mang Teban 50 ₱199.75 9,987.50 134 Pc Premyadong Kuwentong Pambata - Salu - Salo 50 ₱199.75 9,987.50 135 Pc Premyadong Kuwentong Pambata - Si Ginoong Mundo At Ang Kanyang Mahiwagang Kahon 50 ₱199.75 9,987.50 136 Pc Premyadong Kuwentong Pambata - Tuldok: Ang Pinagmulan Ng Buhay 50 ₱199.75 9,987.50 137 Pc Premyadong Kuwentong Pambata- Berting, Ang Batang Uling 50 ₱199.75 9,987.50 138 Pc Premyadong Kuwentong Pambata: Fish For Two 50 ₱199.75 9,987.50 139 Pc Premyadong Kuwentong Pambata: Gusto Ko Nang Lumaki 50 ₱199.75 9,987.50 140 Pc Premyadong Kuwentong Pambata: The Magic Bahag 50 ₱199.75 9,987.50 141 Pc Sa Aming Bahay-bahayan 450 ₱199.75 89,887.50 142 Pc Sa Tapat Ng Tindahan Ni Mang Teban 1,350 ₱199.75 269,662.50 143 Pc Salu Salo 1,050 ₱199.75 209,737.50 144 Pc Sampung Butong Pakwan (big Book) 1,725 ₱270.00 465,750.00 145 Pc Sandosenang Sorpresa (big Book) 2,125 ₱270.00 573,750.00 146 Pc Si Andoy Batang Tondo 80 ₱199.75 15,980.00 147 Pc Si Berting, Ang Batang Uling 1,050 ₱199.75 209,737.50 148 Pc Si Gab At Ang Higanteng Bag 2,888 ₱199.75 576,878.00 149 Pc Si Lola-nanay At Si Dandandan 1,600 ₱199.75 319,600.00 150 Pc Si Tiya Salome 550 ₱199.75 109,862.50 151 Pc Si Bilog, Si Tatsulok, At Si Parisukat (bigbook) 400 ₱270.00 108,000.00 152 Pc Taho Taho Tahooooieyy (small Book) 1,162 ₱199.75 232,109.50 153 Pc The Adventure Of Tom Sawyer 50 ₱249.75 12,487.50 154 Pc The Adventures Of Sherlock Holmes 50 ₱249.75 12,487.50 155 Pc The Invisible Man 50 ₱249.75 12,487.50 156 Pc The Jungle Book 50 ₱249.75 12,487.50 157 Pc The Lost World 50 ₱249.75 12,487.50 158 Pc The Man In The Iron Mask 50 ₱249.75 12,487.50 159 Pc The Three Musketeers 50 ₱249.75 12,487.50 160 Pc The War Of The Worlds 50 ₱249.75 12,487.50 161 Pc The Bear 450 ₱199.75 89,887.50 162 Pc The First Star 50 ₱199.75 9,987.50 163 Pc Treasure Island 50 ₱249.75 12,487.50 164 Pc Tuwing Sabado 400 ₱199.75 79,900.00 165 Pc Tuldok Ang Pinagmulan Ng Buhay 1,100 ₱199.75 219,725.00 166 Pc Tungkol Sa Galit 1,675 ₱149.75 250,831.25 167 Pc English With Values: Anger 50 ₱149.75 7,487.50 168 Pc Tungkol Sa Gawaing-koponan 1,675 ₱149.75 250,831.25 169 Pc Tungkol Sa Kabutihang Loob 1,705 ₱149.75 255,323.75 170 Pc Tungkol Sa Katapatan 1,675 ₱149.75 250,831.25 171 Pc English With Values: Boldness 50 ₱149.75 7,487.50 172 Pc Tungkol Sa Lakas Ng Loob 1,675 ₱149.75 250,831.25 173 Pc The Dog The Rooster And The Fox 50 ₱149.75 7,487.50 174 Pc Tungkol Sa Pagbabahagi 1,675 ₱149.75 250,831.25 175 Pc Tungkol Sa Paggalang 1,675 ₱149.75 250,831.25 176 Pc Tungkol Sa Pagiging Masunurin 1,705 ₱149.75 255,323.75 177 Pc Tungkol Sa Pagkamasayahin 1,625 ₱149.75 243,343.75 178 Pc Tungkol Sa Pagmamahal 1,706 ₱149.75 255,473.50 179 Pc Tungkol Sa Pagpapasalamat 1,776 ₱149.75 265,956.00 180 Pc Tungkol Sa Pagpapasensiya 1,775 ₱149.75 265,806.25 181 Pc Tungkol Sa Pagtitiyaga 1,715 ₱149.75 256,821.25 182 Pc Uncle Sam 90 ₱199.75 17,977.50 183 Pc Tuwing Sabado 90 ₱199.75 17,977.50 184 Pc Tungkol Sa Responsibilidad 1,815 ₱149.75 271,796.25 Learning Area References 1 Pc Tungkol Sa Kabutihang Loob 50 ₱199.75 9,987.50 2 Pc Tungkol Sa Pagbabahagi 50 ₱149.75 7,487.50 3 Pc Tungkol Sa Paggalang 50 ₱199.75 9,987.50 4 Pc Tungkol Sa Pagkamahiyain 50 ₱149.75 7,487.50 5 Pc Tungkol Sa Pagtitiyaga 50 ₱149.75 7,487.50 6 Pc Tungkol Sa Responsibilidad 50 ₱149.75 7,487.50 7 Pc 365 Children's Prayers 500 ₱300.00 150,000.00 8 Pc Abc Pilipinas 50 ₱199.75 9,987.50 9 Pc Ako Ay May Kiki (bigbook) 80 ₱299.75 23,980.00 10 Pc Ako Ay May Titi (bigbook) 80 ₱299.75 23,980.00 11 Pc Ang Batang Galit Sa Lamok 50 ₱199.75 9,987.50 12 Pc Ang Elepante At Ang Anim Na Bulag:parabula Mula Sa India 500 ₱149.75 74,875.00 13 Pc English With Values Anger 80 ₱169.75 13,580.00 14 Pc English With Values Boldness 80 ₱169.75 13,580.00 15 Pc English With Values Love 80 ₱169.75 13,580.00 16 Pc English With Values: Obedience 79 ₱169.75 13,410.25 17 Pc Good Habits (health) 80 ₱129.75 10,380.00 18 Pc Good Habits (nutrition) 79 ₱129.75 10,250.25 19 Pc Inhale, Exhale 50 ₱199.75 9,987.50 20 Pc Karera Para Sa Kalusugan 80 ₱149.75 11,980.00 21 Pc Let's Read Level A Box Set (30 Books Inside) Systematic Phonics 71 ₱3,870.00 274,770.00 22 Pc Magbasa Tayo! Level A Box Set (30 Books Inside) Marungko 71 ₱3,870.00 274,770.00 23 Pc Maging Ligtas Sa Corona Virus 50 ₱199.75 9,987.50 24 Pc Mga Sagisag Ng Pilipinas 50 ₱270.00 13,500.00 25 Pc The Alchemist(ang Alkemista) 500 ₱309.75 154,875.00 26 Pc Tungkol Sa Galit 80 ₱149.75 11,980.00 27 Pc Tungkol Sa Gawaing-koponan 80 ₱149.75 11,980.00 28 Pc Tungkol Sa Katapatan 80 ₱149.75 11,980.00 29 Pc Tungkol Sa Lakas Ng Loob 67 ₱149.75 10,033.25 30 Pc Tungkol Sa Paghahanap Ng Solusyon 50 ₱149.75 7,487.50 31 Pc Tungkol Sa Pagiging Masunurin 50 ₱199.75 9,987.50 32 Pc Tungkol Sa Pagkamahiyain 30 ₱149.75 4,492.50 33 Pc Tungkol Sa Pagkamasayahin 80 ₱149.75 11,980.00 34 Pc Tungkol Sa Pagmamahal 50 ₱199.75 9,987.50 35 Pc Tungkol Sa Pagpapasalamat 80 ₱149.75 11,980.00 36 Pc Tungkol Sa Pagpapasensiya 50 ₱149.75 7,487.50 37 Pc Uncle Sam 50 ₱199.75 9,987.50 General References 1 Pc Abc Pilipinas 30 ₱199.75 ₱5,992.50 2 Pc Mga Sagisag Ng Pilipinas 30 ₱270.00 ₱8,100.00 3 Pc 365 Children's Prayers 420 ₱300.00 ₱126,000.00 Sub-total – Lot 6 145,585 P 32,735,549.75 Lot 7 1 Pc Alin? Alin? Ang Daming Damdamin 1,100 150.00 P165,000.00 2 Pc Anak Ng Tinapay 590 215.00 126,850.00 3 Pc Ang Kuya Kong Zombie 600 150.00 90,000.00 4 Pc Big Brother 90 150.00 13,500.00 5 Pc Biyahe Ng Mga Ibong Dayo 100 150.00 15,000.00 6 Pc Covidoom! 90 150.00 13,500.00 7 Pc Happy Home 01: Coming Home 100 150.00 15,000.00 8 Pc I Am Scared 190 130.00 24,700.00 9 Pc Imbisibol 700 150.00 105,000.00 10 Pc Kaya Ni Mina 690 150.00 103,500.00 11 Pc Light Seeker 600 250.00 150,000.00 12 Pc Maselan Ang Tanong Ng Batang Si Usman 1,090 215.00 234,350.00 13 Pc May Giyera Sa Katawan Ni Mark 650 150.00 97,500.00 14 Pc May Mga Lihim Kami Ni Ingkong 90 150.00 13,500.00 15 Pc Mga Kuwento Ni Tito Dok #2 Aray, Nasugatan Ako! 90 150.00 13,500.00 16 Pc Mga Kuwento Ni Tito Dok #3 Aba, May Baby Sa Loob Ng Tiyan Ni Mommy! 90 150.00 13,500.00 17 Pc My Read, See And Touch Bible 90 550.00 49,500.00 18 Pc No Lipstick For Mother 190 150.00 28,500.00 19 Pc Noodle Hair 1,100 150.00 165,000.00 20 Pc Oki Dok! #1 Nilalagnat Si Enat! 90 130.00 11,700.00 21 Pc Oki Dok! 4 Mapili Sa Pagkain Si Aryn! 90 130.00 11,700.00 22 Pc Sakto Lang 90 150.00 13,500.00 23 Pc Sandosenang Sapatos (big Books) 90 350.00 31,500.00 24 Pc Shy Shelly 1 The Secret Of Shy Shelly 550 215.00 118,250.00 25 Pc Shy Shelly 2 Shy Shelly And The Bully 550 215.00 118,250.00 26 Pc Shy Shelly 3 Shy Shelly And The Big Lie 550 215.00 118,250.00 27 Pc Si Duglit, Ang Dugong Maliit 600 150.00 90,000.00 28 Pc Slaying The Joy-snatchers 500 245.00 122,500.00 29 Pc The Last Tree 90 150.00 13,500.00 30 Pc The Magic Of Apo Mayor 50 150.00 7,500.00 31 Pc The Sad Cat (bigbook) 150 350.00 52,500.00 32 Pc The White Shoes 190 150.00 28,500.00 33 Pc Tinola Ni Nanay 190 150.00 28,500.00 34 Pc Tuli O Di-tuli 150 215.00 32,250.00 35 Pc Unang Dalaw 150 215.00 32,250.00 Sub-total – Lot 7 12,320 P2,268,050.00 Lot 8 General References 1 Pc World Book Encyclopedia 2024 Edition 3 110,000.00 P330,000.00 2 Pc Anti- Bullying Basics 48 16,666.67 800,000.16 3 Pc Be A Leader 11 8,888.89 97,777.79 4 Pc Building Blocks Of Animals And Plants 9 20,000.00 180,000.00 5 Pc Building Blocks Of Chemistry 11 23,333.33 256,666.63 6 Pc Building Blocks Of Geography 11 23,333.33 256,666.63 7 Pc Building Blocks Of Math 2 2 23,333.33 46,666.66 8 Pc Building Blocks Of Math 1 3 20,000.00 60,000.00 9 Pc Cool Tech 1 65 17,777.78 1,155,555.70 10 Pc Curiosity Encyclopedia 44 22,222.22 977,777.68 11 Pc Discovery Encyclopedia 9 50,000.00 450,000.00 12 Pc Discovery Encyclopedia Vol. 1 8 3,846.15 30,769.20 13 Pc Discovery Encyclopedia Vol. 10 8 3,846.15 30,769.20 14 Pc Discovery Encyclopedia Vol. 11 8 3,846.15 30,769.20 15 Pc Discovery Encyclopedia Vol. 12 8 3,846.15 30,769.20 16 Pc Discovery Encyclopedia Vol. 13 8 3,846.15 30,769.20 17 Pc Discovery Encyclopedia Vol. 2 8 3,846.15 30,769.20 18 Pc Discovery Encyclopedia Vol. 3 8 3,846.15 30,769.20 19 Pc Discovery Encyclopedia Vol. 4 8 3,846.15 30,769.20 20 Pc Discovery Encyclopedia Vol. 5 8 3,846.15 30,769.20 21 Pc Discovery Encyclopedia Vol. 6 8 3,846.15 30,769.20 22 Pc Discovery Encyclopedia Vol. 7 8 3,846.15 30,769.20 23 Pc Discovery Encyclopedia Vol. 8 8 3,846.15 30,769.20 24 Pc Discovery Encyclopedia Vol. 9 8 3,846.15 30,769.20 25 Pc Discovery Science Encylopedia 23 35,555.56 817,777.88 26 Pc Facing Life Challenges 72 20,000.00 1,440,000.00 27 Pc Fun With Colors 20 20,000.00 400,000.00 28 Pc History Summarized 15 27,777.78 416,666.70 29 Pc Library Of Natural Disasters 15 27,777.78 416,666.70 30 Pc Our Solar System 37 20,000.00 740,000.00 31 Pc Taste The World 22 16,666.67 366,666.74 32 Pc World Book Encyclopedia 2024 Edition 12 110,000.00 1,320,000.00 33 Pc World Book Encyclopedia 2024 Edition Vol. 14 15 5,000.00 75,000.00 34 Pc World Book Encyclopedia 2024 Edition Vol. 10 15 5,000.00 75,000.00 35 Pc World Book Encyclopedia 2024 Edition Vol. 15 15 5,000.00 75,000.00 36 Pc World Book Encyclopedia 2024 Edition Vol. 16 15 5,000.00 75,000.00 37 Pc World Book Encyclopedia 2024 Edition Vol. 17 15 5,000.00 75,000.00 38 Pc World Book Encyclopedia 2024 Edition Vol. 18 15 5,000.00 75,000.00 39 Pc World Book Encyclopedia 2024 Edition Vol. 19 15 5,000.00 75,000.00 40 Pc World Book Encyclopedia 2024 Edition Vol. 20 15 5,000.00 75,000.00 41 Pc World Book Encyclopedia 2024 Edition Vol. 20 15 5,000.00 75,000.00 42 Pc World Book Encyclopedia 2024 Edition Vol. 22 15 5,000.00 75,000.00 43 Pc World Book Encyclopedia 2024 Edition Vol. 4 15 5,000.00 75,000.00 44 Pc World Book Encyclopedia 2024 Edition Vol. 5 15 5,000.00 75,000.00 45 Pc World Book Encyclopedia 2024 Edition Vol. 6 15 5,000.00 75,000.00 46 Pc World Book Encyclopedia 2024 Edition Vol. 7 15 5,000.00 75,000.00 47 Pc World Book Encyclopedia 2024 Edition Vol. 8 15 5,000.00 75,000.00 48 Pc World Book Encyclopedia 2024 Edition Vol. 1 15 5,000.00 75,000.00 49 Pc World Book Encyclopedia 2024 Edition Vol. 9 15 5,000.00 75,000.00 50 Pc World Book Encyclopedia 2024 Edition Vol. 11 15 5,000.00 75,000.00 51 Pc World Book Encyclopedia 2024 Edition Vol. 2 15 5,000.00 75,000.00 52 Pc World Book Encyclopedia 2024 Edition Vol. 3 15 5,000.00 75,000.00 53 Pc World Book Encyclopedia 2024 Edition Vol. 12 15 5,000.00 75,000.00 54 Pc World Book Encyclopedia 2024 Edition Vol. 13 15 5,000.00 75,000.00 Learning Area References 1 Pc Anti- Bullying Basics 13 16,666.67 216,666.71 2 Pc Be A Leader 28 8,888.89 248,888.92 3 Pc Building Blocks Of Human Body 30 20,000.00 600,000.00 4 Pc Building Blocks Of Animals And Plants 72 20,000.00 1,440,000.00 5 Pc Building Blocks Of Chemistry 55 23,333.33 1,283,333.15 6 Pc Building Blocks Of Computer Science 54 20,000.00 1,080,000.00 7 Pc Building Blocks Of Finance 13 20,000.00 260,000.00 8 Pc Building Blocks Of Geography 83 23,333.33 1,936,666.39 9 Pc Building Blocks Of Human Body 72 20,000.00 1,440,000.00 10 Pc Building Blocks Of Math 1 47 20,000.00 940,000.00 11 Pc Building Blocks Of Math 2 55 23,333.33 1,283,333.15 12 Pc Building Blocks Of Math 1 55 20,000.00 1,100,000.00 13 Pc Building Blocks Of Math 2 47 23,333.33 1,096,666.51 14 Pc Building Blocks Of Physical Science 52 23,333.33 1,213,333.16 15 Pc Cool Tech 1 2 17,777.78 35,555.56 16 Pc Facing Life's Challenges 5 20,000.00 100,000.00 17 Pc Fun With Colors 17 20,000.00 340,000.00 18 Pc Hello, Beautiful! 12 15,555.56 186,666.72 19 Pc History Summarized 13 27,777.78 361,111.14 20 Pc Our Solar System 32 20,000.00 640,000.00 21 Pc Survival Stories 31 22,222.22 688,888.82 22 Pc Taste The World 19 16,666.67 316,666.73 Sub-total – Lot 8 1,673 29,386,665.83 Lot 9 Fiction 1 Pc Ang Kalasag Ni Kara: Nang Pumutok Ang Bulkan 100 170.00 17,000.00 2 Pc Pb Ako Ay May Lobo '22 50 250.00 12,500.00 3 Pc Pb Animals And Habitat '22 50 250.00 12,500.00 4 Pc Pb Animals And Young '22 50 250.00 12,500.00 5 Pc Pb Animals That Fly '22 50 250.00 12,500.00 6 Pc Pb Bahay Kubo '22 50 250.00 12,500.00 7 Pc Pb Bodies Of Water '22 50 250.00 12,500.00 8 Pc Pb Can You Do It '22 50 250.00 12,500.00 9 Pc Pb Care Eyes Nose Mouth '22 50 250.00 12,500.00 10 Pc Pb Common Words Eng '22 50 250.00 12,500.00 11 Pc Pb Common Words Fil '22 50 250.00 12,500.00 12 Pc Pb Community Build Things '22 50 250.00 12,500.00 13 Pc Pb Community Keep Clean '22 50 250.00 12,500.00 14 Pc Pb Community Prepare Food '22 50 250.00 12,500.00 15 Pc Pb Community Safe Healthy '22 50 250.00 12,500.00 16 Pc Pb Community Teach Good '22 50 250.00 12,500.00 17 Pc Pb Different Celebrations '22 50 250.00 12,500.00 18 Pc Pb Different Clothes '22 50 250.00 12,500.00 19 Pc Pb Do We Sound Alike '22 50 250.00 12,500.00 20 Pc Pb Family Members '22 50 250.00 12,500.00 21 Pc Pb Filipino Heroes '22 50 250.00 12,500.00 22 Pc Pb Filipino Values Culture '22 50 250.00 12,500.00 23 Pc Pb Food Groups '22 50 250.00 12,500.00 24 Pc Pb Healthy Foods '22 50 250.00 12,500.00 25 Pc Pb Household Chores '22 50 250.00 12,500.00 26 Pc Pb I Know Table Manners '22 50 250.00 12,500.00 27 Pc Pb Initial Final Sound '22 50 250.00 12,500.00 28 Pc Pb Keep Our Home Safe '22 50 250.00 12,500.00 29 Pc Pb Land Animals '22 50 250.00 12,500.00 30 Pc Pb Land Water And Air '22 50 250.00 12,500.00 31 Pc Pb Lanforms Around Me '22 50 250.00 12,500.00 32 Pc Pb Learning Alphabet '22 50 250.00 12,500.00 33 Pc Pb Leron Leron Sinta '22 50 250.00 12,500.00 34 Pc Pb Lubi Lubi '22 50 250.00 12,500.00 35 Pc Pb Magagandang Asal '22 50 250.00 12,500.00 36 Pc Pb Me And My Senses '22 50 250.00 12,500.00 37 Pc Pb My Body Changes '22 50 250.00 12,500.00 38 Pc Pb Number Words 0-20 '22 50 250.00 12,500.00 39 Pc Pb Numerals 0-10 '22 50 250.00 12,500.00 40 Pc Pb Numerals 0-20 '22 50 250.00 12,500.00 41 Pc Pb Opposites '22 50 250.00 12,500.00 42 Pc Pb Paa Tuhod Balikat Ulo '22 50 250.00 12,500.00 43 Pc Pb Parts Of The House '22 50 250.00 12,500.00 44 Pc Pb Pet Animals '22 50 250.00 12,500.00 45 Pc Pb Philippine Fiestas '22 50 250.00 12,500.00 46 Pc Pb Places In Community '22 50 250.00 12,500.00 47 Pc Pb Pollution '22 50 250.00 12,500.00 48 Pc Pb Rooms Of The House '22 50 250.00 12,500.00 49 Pc Pb Sampung Mga Daliri '22 50 250.00 12,500.00 50 Pc Pb Shapes And Colors '22 50 250.00 12,500.00 51 Pc Pb Take Care Of Earth '22 50 250.00 12,500.00 52 Pc Pb Taking Care Of Body '22 50 250.00 12,500.00 53 Pc Pb Tatlong Bibe '22 50 250.00 12,500.00 54 Pc Pb Things I Can Do '22 50 250.00 12,500.00 55 Pc Pb Things I Do Clean Body '22 50 250.00 12,500.00 56 Pc Pb Things I Do With Family '22 50 250.00 12,500.00 57 Pc Pb Things I Use Clean Self '22 50 250.00 12,500.00 58 Pc Pb Understand Feelings '22 50 250.00 12,500.00 59 Pc Pb Understanding Body '22 50 250.00 12,500.00 60 Pc Pb Water Animals '22 50 250.00 12,500.00 61 Pc Pb Weather '22 50 250.00 12,500.00 62 Pc Wonderful Jungle Stories: Crow Learns 100 170.00 17,000.00 Learning Area References 1 Pc 21c Performance Tasks English 4' 2017 Ed. 21 333.00 6,993.00 2 Pc 21c Performance Tasks English 5' 2017 Ed. 30 333.00 9,990.00 3 Pc 21c Performance Tasks English 6' 2017 Ed. 30 333.00 9,990.00 4 Pc 21c Performance Tasks Math 4' 2017 Ed. 30 333.00 9,990.00 5 Pc 21c Performance Tasks Math 5' 2017 Ed. 30 333.00 9,990.00 6 Pc 21c Performance Tasks Math 6' 2017 Ed. 30 333.00 9,990.00 7 Pc 21c Performance Tasks Science 4' 2017 Ed. 30 333.00 9,990.00 8 Pc 21c Performance Tasks Science 5' 2017 Ed. 30 333.00 9,990.00 9 Pc 21c Performance Tasks Science 6' 2017 Ed. 30 333.00 9,990.00 10 Pc Ang Kalasag Ni Kaloy: Sa Panahong May Pandemya Sanhi Ng Covid-19 90 170.00 15,300.00 11 Pc Ang Kalasag Ni Kara: Nang Pumutok Ang Bulkan 90 170.00 15,300.00 12 Pc Ang Kalasag Ni Kiko: Nang Dumating Ang Malakas Ng Lindol 90 170.00 15,300.00 13 Pc Ang Kalasag Ni Kokoy: Nang Gumuho Ang Lupa 90 170.00 15,300.00 14 Pc Applied Economics 500 434.00 217,000.00 15 Pc Business Ethics And Social Responsibility 500 403.00 201,500.00 16 Pc Business Finance 500 542.00 271,000.00 17 Pc Business Mathematics Rev. Ed 500 621.00 310,500.00 18 Pc Creative Nonfiction 500 495.00 247,500.00 19 Pc Cyber Science 4 Wt K-12 Ed'21 140 804.00 112,560.00 20 Pc Cyber Science 5 Wt K-12 Ed'21 140 804.00 112,560.00 21 Pc Cyber Science 6 Wt K-12 Ed'21 140 804.00 112,560.00 22 Pc Essential English For Act 4 Wt'23 140 781.00 109,340.00 23 Pc Essential English For Act 5 Wt'23 140 781.00 109,340.00 24 Pc Essential English For Act 6 Wt'23 140 781.00 109,340.00 25 Pc Essential English For Active Learners 4 50 839.00 41,950.00 26 Pc Hello-ants Eng Tag'19 600 150.00 90,000.00 27 Pc Hello-butterfly Eng Tag'19 600 150.00 90,000.00 28 Pc Hello-dragon Fly Eng Tag'19 600 150.00 90,000.00 29 Pc Hello-frog Eng Tag'19 600 150.00 90,000.00 30 Pc Hello-snail Eng Tag'19 600 150.00 90,000.00 31 Pc Hello-spider Eng Tag'19 600 150.00 90,000.00 32 Pc Hello-tortoise Eng Tag'19 600 150.00 90,000.00 33 Pc Honing The 5 Macro Skills For Communicative Competence '22 (oral Comm.) 177 288.00 50,976.00 34 Pc How To Succeed In The 21st Century Work Environment 500 449.00 224,500.00 35 Pc Introduction To The Philosophy Of Human Person 500 437.00 218,500.00 36 Pc Kalasag Ni Kala: Nang Dumating Ang Mabagsik Na Bagyo 90 170.00 15,300.00 37 Pc Msb - General Mathematics Work Book 163 265.00 43,195.00 38 Pc Msb - Physical Science 280 265.00 74,200.00 39 Pc Msb-disaster Readiness Wb'22 185 265.00 49,025.00 40 Pc My Bayani Classroom Journal 1 90 350.00 31,500.00 41 Pc My Bayani Classroom Journal 2 90 350.00 31,500.00 42 Pc My Bayani Classroom Journal 3 90 350.00 31,500.00 43 Pc My Bayani Storybook 1 110 400.00 44,000.00 44 Pc My Bayani Storybook 2 110 400.00 44,000.00 45 Pc My Bayani Storybook 3 110 400.00 44,000.00 46 Pc My Skill Builder Math 7 Wb' 2020 Ed. 185 345.00 63,825.00 47 Pc My Skill Builder Math 8 Wb' 2020 Ed. 200 345.00 69,000.00 48 Pc My Skill Builder Math 9 Wb' 2020 Ed. 200 345.00 69,000.00 49 Pc My Skill Builder Math 10 Wb' 2020 Ed. 165 345.00 56,925.00 50 Pc Number Smart 4 Wt'21 140 781.00 109,340.00 51 Pc Number Smart 5 Wt'21 140 804.00 112,560.00 52 Pc Number Smart 6 Wt'21 140 804.00 112,560.00 53 Pc Pagbasa At Pagsusuri Ng Iba't Ibang Teksto Tungo Sa Pananalilksik 500 505.00 252,500.00 54 Pc Personal Development 380 506.00 192,280.00 55 Pc Physical Education And Health 1 430 343.00 147,490.00 56 Pc Practical Research 1 110 368.00 40,480.00 57 Pc Practical Research 2 110 380.00 41,800.00 58 Pc Principles Of Marketing 2019 Ed 500 673.00 336,500.00 59 Pc Science Links 7 Wt'23 160 804.00 128,640.00 60 Pc Science Links 10 Wt'23 160 804.00 128,640.00 61 Pc Science Links 8 Wt'23 160 804.00 128,640.00 62 Pc Science Links 9 Wt'23 160 804.00 128,640.00 63 Pc Steam For All 10 Wb '23 (science,technology,engineering,arts,mathematics) 20 432.00 8,640.00 64 Pc Steam For All 7 Wb '23 (science,technology,engineering,arts,mathematics) 25 432.00 10,800.00 65 Pc Steam For All 8 Wb '23 (science,technology,engineering,arts,mathematics) 25 432.00 10,800.00 66 Pc Steam For All 9 Wb '23 (science,technology,engineering,arts,mathematics) 40 432.00 17,280.00 Sub-total – Lot 9 17,856 P6,585,799.00 Lot 10 1 Pc Global Times Living History 8: Ang Kasaysayan Ng Mundo 165 1,070.00 P176,550.00 2 Pc Global Times Living History 9: Ekonomiks 2022 165 860.00 141,900.00 3 Pc Global Times Living History 9: Mga Kotemporaneong Isyu 165 730.00 120,450.00 4 Pc New English Experience For Us 2/e Wt Gr. 7 Matatag C2024 140 570.00 79,800.00 5 Pc New English Experience For Us Wt Gr. 8 Kto12 C2022 140 570.00 79,800.00 6 Pc New English Experience For Us Wt Gr. 9 Kto12 C2022 140 570.00 79,800.00 7 Pc New English Experience For Us Wt Gr.10 Kto12 C2022 140 570.00 79,800.00 8 Pc Next Century Mathematics: Basic Calculus 2/e Tb Gr.11 Kto12 2022 140 895.00 125,300.00 9 Pc Next Century Mathematics: Precalculus Shs Kto12 Tb 2/ed 140 710.00 99,400.00 10 Pc Next Century Mathematics: Statistics And Probability 2/e Tb Gr.11 Kto12 140 1,020.00 142,800.00 11 Pc Sibs Active Reading Buddy (arb) 450 500.00 225,000.00 12 Pc Teacher's Pet / Kit 30 17,000.00 510,000.00 Sub-total – Lot 10 1,955 P1,860,600.00 Lot 11 Fiction 1 Pc Ang Nanay Ni Erwin, Ang Tatay Ni Klara 1,200 185.00 P222,000.00 2 Pc Bantay: The Cat Who Wants To Be A Dog 1,200 185.00 222,000.00 3 Pc Cooking 101: For Kids And Kids-at-heart 500 255.00 127,500.00 4 Pc Every Sunday: A Story On Learning Sign Language 1,100 185.00 203,500.00 5 Pc Junior Ipon 600 235.00 141,000.00 6 Pc Puwede Po Ba Tayong Magbasa Ng Aklat? 1,201 185.00 222,185.00 7 Pc Super Maya 600 385.00 231,000.00 8 Pc Super Maya And Her Amazing Ears 600 385.00 231,000.00 9 Pc The Legend Of The Cagayan River 600 185.00 111,000.00 10 Pc Too Loud: Soothing Sensory Overload With Music 600 185.00 111,000.00 11 Pc Where Did All The Fireflies Go? 1,200 185.00 222,000.00 Learning Area References 1 Pc Awtor Ako!: Malikhaing Pagsulat, Malikhaing Kabataan 510 260.00 132,600.00 2 Pc Bayani Biographies: Andres Bonifacio 75 235.00 17,625.00 3 Pc Bayani Biographies: Apolinario Mabini 793 235.00 186,355.00 4 Pc Bayani Biographies: Jose Rizal 75 235.00 17,625.00 5 Pc Bayani Biographies: Teresa Magbanua 600 235.00 141,000.00 6 Pc Baybayin, Ating Tuklasin! 495 235.00 116,325.00 7 Pc Cooking 101: For Kids And Kids-at-heart 25 255.00 6,375.00 8 Pc Desserts 101: For Kids And Kids-at-heart 76 255.00 19,380.00 9 Pc Discover Baybayin 495 235.00 116,325.00 10 Pc Every Sunday (tuwing Linggo): A Story On Learning Sign Language 101 185.00 18,685.00 11 Pc Fish Be With You: The Children's Guide To Aquarium Care 75 255.00 19,125.00 12 Pc Junior Ipon 25 235.00 5,875.00 13 Pc Meow And Furever: Growing Up With Your Cat 25 215.00 5,375.00 14 Pc Plant With Me: A Beginner's Guide To Gardening 710 235.00 166,850.00 15 Pc Super Maya 500 385.00 192,500.00 16 Pc Some Bunny To Love: The Children's Rabbit Care Guide 95 215.00 20,425.00 17 Pc The "small" Big Books Of Dogs 25 215.00 5,375.00 Sub-total – Lot 11 14,101 P3,232,005.00 Lot 12 Fiction 1 Pc A Lolong Time Ago:a Prehistory Of The Philippines Book 1 50 275.00 P13,750.00 2 Pc Ang Mga Gumagapang-gapang 100 220.00 22,000.00 3 Pc Ay Naku! 50 220.00 11,000.00 4 Pc Bandila:the Story Of The Philippine Flag 50 195.00 9,750.00 5 Pc Cashaysayan:a History Of Philippine Money 50 275.00 13,750.00 6 Pc Cely's Crocodile:the Art And Story Of Araceli Limcaco Dans 700 195.00 136,500.00 7 Pc Mang Andoy's Signs 650 220.00 143,000.00 8 Pc Pitong Tsinelas 50 150.00 7,500.00 9 Pc Sinobayani?jose Rizal:a Halo-halo Espesyal 50 295.00 14,750.00 10 Pc Takbo! Kapag Naging Tinig Ang Tunog 100 195.00 19,500.00 11 Pc Takbo! Kapag Naging Tinig Ang Tunog(2nd Edition) 50 195.00 9,750.00 12 Pc The Mats 50 195.00 9,750.00 Learning Area References 1 Pc Ang Mahabang Sampayan Ni Nanay 600 250.00 150,000.00 2 Pc Ang Mga Gumagapang-gapang : House Bugs And Creepy Crawlies 600 220.00 132,000.00 3 Pc Bugtong,bugtong: More Filipino Riddles (volume 2) 100 175.00 17,500.00 4 Pc Pitong Tsinelas 100 150.00 15,000.00 5 Pc Sari-sari:mga Salitang Paulit-ulit 100 195.00 19,500.00 6 Pc Saya/saya! Isang Baybay Ibang Saysay 100 195.00 19,500.00 7 Pc Sinobayani? Jose Rizal:a Halo-halo Espesyal 500 295.00 147,500.00 8 Pc Sinobayani?jose Rizal:a Halo-halo Espesyal 100 295.00 29,500.00 9 Pc Takbo! Kapag Naging Tinig Ang Tunog(2nd Edition) 100 195.00 19,500.00 Sub-total – Lot 12 4,250 P961,000.00 Lot 13 Fiction 1 Pc A Curse For An Emperor 450 525.00 P236,250.00 2 Pc A Sea Of Stories: Tales From Sulu Sb 400 360.00 144,000.00 3 Pc Ang Kural Na Bahay 400 150.00 60,000.00 4 Pc Ang Mga Anak Ng Bayan Sa Katipunan 491 120.00 58,920.00 5 Pc Biyernes Ang Pinaka-paborito Kong Araw 400 120.00 48,000.00 6 Pc Blueplate 50 135.00 6,750.00 7 Pc Danao The Parrot 400 150.00 60,000.00 8 Pc Diwa The Dugong 490 150.00 73,500.00 9 Pc Good Manners, Pinoy Style 40 300.00 12,000.00 10 Pc Good Night 50 150.00 7,500.00 11 Pc Here Among The Mangroves 400 150.00 60,000.00 12 Pc Imbisibol Na Ako 450 120.00 54,000.00 13 Pc Kapaa Ko Si Kuya 50 160.00 8,000.00 14 Pc Karagatan Ng Mga Kuwento - Ang Jin At Ang Pawikan 400 120.00 48,000.00 15 Pc Karagatan Ng Mga Kuwento - Biyaheng Page 400 120.00 48,000.00 16 Pc Karagatan Ng Mga Kuwento - Handog Ni Lola 400 120.00 48,000.00 17 Pc Karagatan Ng Mga Kuwento - Bangkang Bakunawa 400 120.00 48,000.00 18 Pc Karagatan Ng Mga Kuwento - Mapun 400 120.00 48,000.00 19 Pc Lub Dub. Lub Dub 400 120.00 48,000.00 20 Pc Made Perfect In Weakness 450 120.00 54,000.00 21 Pc May Sampung Sisiw Sa Batis 50 120.00 6,000.00 22 Pc Mayumi The Forest Pig 400 150.00 60,000.00 23 Pc Nanny's Hands 400 120.00 48,000.00 24 Pc Pages 400 120.00 48,000.00 25 Pc Pandaka: Ang Pinakamaliit Na Isda 940 150.00 141,000.00 26 Pc Pipisin The Pangolin 400 150.00 60,000.00 27 Pc Play 450 150.00 67,500.00 28 Pc Prose And Poems 450 385.00 173,250.00 29 Pc Sea Of Stories - Grandmother's Gift 400 120.00 48,000.00 30 Pc Sea Of Stories - Mapun 400 120.00 48,000.00 31 Pc Sea Of Stories - The Jin And The Turtle 400 120.00 48,000.00 32 Pc Si Sibol At Si Hunaw 400 135.00 54,000.00 33 Pc The Day Of Darkness 400 150.00 60,000.00 34 Pc The Day The Dancers Came 450 260.00 117,000.00 35 Pc The Jinx, The Dolphin And The Deep Sea Mystery 450 240.00 108,000.00 36 Pc The Woman Who Had Two Navels 450 240.00 108,000.00 37 Pc Tingnan Ninyo Itong Nakita Ko 400 150.00 60,000.00 38 Pc Yehey May Pamilya Na Ring Mag-aaruga Sa Akin 400 150.00 60,000.00 Learning Area References 1 Pc A Dictionary Of The Philippine Plant Names, Vol. 1 28 1,650.00 46,200.00 2 Pc A Dictionary Of The Philippine Plant Names, Vol. 2 30 1,650.00 49,500.00 3 Pc Common Courtesies - At The Movies 344 120.00 41,280.00 4 Pc Common Courtesies - At The Table 1034 120.00 124,080.00 5 Pc Common Courtesies - In The Bathroom 1034 120.00 124,080.00 6 Pc Common Courtesies - On The Street 1032 120.00 123,840.00 7 Pc Common Courtesies - Online 1034 120.00 124,080.00 8 Pc Florante At Laura By Francisco Balagtas 50 375.00 18,750.00 9 Pc Fruits Of The Philippines 50 720.00 36,000.00 10 Pc Good Manners, Pinoy Style 50 300.00 15,000.00 11 Pc Marine Reserves In The Philippines: Historical Dvelopment, Effects And Influence On Marine Conservation Policy 34 325.00 11,050.00 12 Pc The Philippine Cookbook, 2nd Ed. 34 590.00 20,060.00 13 Pc Kinilaw, A Philippine Cuisine Of Freshness 25 410.00 10,250.00 General References 1 Pc Fruits Of The Philippines 40 720.00 28,800.00 2 Pc A Pictorial Cyclopedia Of Philippine Ornamental Plants 12 2,795.00 33,540.00 3 Pc Common Courtesies - At The Movies 10 120.00 1,200.00 4 Pc Common Courtesies - At The Table 10 120.00 1,200.00 5 Pc Common Courtesies - In The Bathroom 10 120.00 1,200.00 6 Pc Common Courtesies - On The Street 10 120.00 1,200.00 7 Pc Common Courtesies - Online 10 120.00 1,200.00 8 Pc Noli Me Tangere - Sb By Jose Rizal 20 450.00 9,000.00 9 Pc El Filibusterismo: Subversion By Jose Rizal 30 235.00 7,050.00 P Sub-total – Lot 13 19,492 P3,314,230.00 Lot 14 General References 1 Pc 500 Questions And Answers-dinosaurs 190 599.00 P113,810.00 2 Pc 500 Questions And Answers: An Introduction To Learning About Planets 924 599.00 553,476.00 3 Pc A Celebration Of Mindfulness- Love 410 299.00 122,590.00 4 Pc A Celebration Of Mindfulness-believe 410 299.00 122,590.00 5 Pc A Celebration Of Mindfulness-joy 415 299.00 124,085.00 6 Pc A Celebration Of Mindfulness-peace 410 299.00 122,590.00 7 Pc Amazing Facts - Human Body 330 299.00 98,670.00 8 Pc Amazing Facts - Science 400 299.00 119,600.00 9 Pc Amazing Facts-space 380 299.00 113,620.00 10 Pc Amazing Facts-dinosaurs 250 299.00 74,750.00 11 Pc Focus On With Lenticular - Birds 50 249.75 12,487.50 12 Pc Focus On With Lenticular - Flight 50 249.75 12,487.50 13 Pc Focus On With Lenticular - Inventions 50 249.75 12,487.50 14 Pc Focus On With Lenticular - Wild Animals 50 249.75 12,487.50 15 Pc Hinkler Explore-101 Cool Science Experiments 50 349.00 17,450.00 16 Pc Book Of Everything 50 699.00 34,950.00 17 Pc Lift The Flaps: Human Body 600 499.00 299,400.00 18 Pc Smart Babies Bible Pop-up-gideon The Mighty Warrior 50 129.00 6,450.00 19 Pc Smart Babies Bible Pop-up-joshua The Faithful Conqueror 50 129.00 6,450.00 20 Pc Pop-up Picture Book-daniel In The Lion's Den 50 129.00 6,450.00 21 Pc Pop-up Picture Book-jonah And The Whale 50 129.00 6,450.00 22 Pc Pop-up Picture Book-the Story Of Moses 50 129.00 6,450.00 23 Pc Pop-up Picture Book-the Story Of Noah's Ark 50 129.00 6,450.00 24 Pc Smart Babies Discover The World 50 129.00 6,450.00 25 Pc Smart Babies: My First Carry Along Bible 595 349.75 208,101.25 26 Pc Smart Kids My First Steam Words-mathematics 50 159.00 7,950.00 27 Pc Smart Kids My First Steam Words-science 50 159.00 7,950.00 28 Pc Smart Kids My First Steam Words-technology 50 159.00 7,950.00 29 Pc Smart Kids: My First Atlas Of The Philippines 595 149.75 89,101.25 30 Pc Smart Kids: My First Picture Dictionary 946 249.75 236,263.50 31 Pc Smart Kids Discover The World - The Seven Continents 45 129.00 5,805.00 32 Pc Smart Kids Life Cycle Of A Frog 45 129.00 5,805.00 33 Pc Wonders Of Learning - Discover Computers And Coding 385 299.00 115,115.00 34 Pc Wonders Of Learning - Discover Chemistry 340 299.00 101,660.00 35 Pc Wonders Of Learning - Discover Earthquakes & Volcanoes 80 299.00 23,920.00 36 Pc Wonders Of Learning - Discover Physics 385 299.00 115,115.00 37 Pc Wonders Of Learning - Discover Robotics 385 299.00 115,115.00 38 Pc Wonders Of Learning-discover Animal Encyclopedia 50 299.00 14,950.00 39 Pc Wonders Of Learning-discover Biology 50 299.00 14,950.00 40 Pc Wonders Of Learning-discover Botany 50 299.00 14,950.00 41 Pc Wonders Of Learning-discover Chemistry 50 299.00 14,950.00 42 Pc Wonders Of Learning-discover Computers & Coding 50 299.00 14,950.00 43 Pc Wonders Of Learning-discover Dinosaurs 50 299.00 14,950.00 44 Pc Wonders Of Learning-discover Earthquakes & Volcanoes 50 299.00 14,950.00 45 Pc Wonders Of Learning-discover Electricity & Magnetism 50 299.00 14,950.00 46 Pc Wonders Of Learning-discover Endangered Animals 50 299.00 14,950.00 47 Pc Wonders Of Learning-discover First Aid 50 299.00 14,950.00 48 Pc Wonders Of Learning-discover Geography 50 299.00 14,950.00 49 Pc Wonders Of Learning-discover Geology 50 299.00 14,950.00 50 Pc Wonders Of Learning-discover Global Warming & Climate Change 50 299.00 14,950.00 51 Pc Wonders Of Learning-discover Light, Sound & Motion 50 299.00 14,950.00 52 Pc Wonders Of Learning-discover Oceans 50 299.00 14,950.00 53 Pc Wonders Of Learning-discover Physics 50 299.00 14,950.00 54 Pc Wonders Of Learning-discover Reptiles 50 299.00 14,950.00 55 Pc Wonders Of Learning-discover Robotics 50 299.00 14,950.00 56 Pc Wonders Of Learning-discover Science 50 299.00 14,950.00 57 Pc Wonders Of Learning-discover Space 50 299.00 14,950.00 58 Pc Wonders Of Learning-saving Planet Earth 50 299.00 14,950.00 59 Pc Wonders Of Learning-discover Global Warming & Climate Change 410 299.00 122,590.00 60 Pc Wonders Of Learning-discover Endangered Animals 190 299.00 56,810.00 Learning Area References 1 Pc 500 Questions And Answers: An Introduction To Learning About Planets 600 599.00 359,400.00 2 Pc A Celebration Of Mindfulness- Love 600 299.00 179,400.00 3 Pc A Celebration Of Mindfulness-believe 600 299.00 179,400.00 4 Pc A Celebration Of Mindfulness-joy 600 299.00 179,400.00 5 Pc A Celebration Of Mindfulness-peace 600 299.00 179,400.00 6 Pc Amazing Facts - Space 600 299.00 179,400.00 7 Pc Building Blocks Of Chemistry 6 23,333.00 139,998.00 8 Pc Lift The Flaps: Human Body 500 499.00 249,500.00 9 Pc Smart Kids Life Cycle Of A Frog 500 129.00 64,500.00 10 Pc Smart Kids Discover The World - The Seven Continents 100 129.00 12,900.00 11 Pc Wonders Of Learning - Discover Chemistry 600 299.00 179,400.00 12 Pc Wonders Of Learning - Discover Computers And Coding 600 299.00 179,400.00 13 Pc Wonders Of Learning - Discover Physics 600 299.00 179,400.00 14 Pc Wonders Of Learning - Discover Robotics 600 299.00 179,400.00 Sub-total – Lot 14 18,076 ₱5,986,780.00 Grand Total ₱ ₱132,332,000.58 11. The Department Of Education Regional Office Ii Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Minerva Karen C. Guzman Bac Secretariat Chairperson Procurement Unit, Deped Ro2 Carig, Tuguegarao City 3500 Bac.region2@deped.gov.ph (078) -304-3855; 09777869781 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Visit Our Website At Region2.deped.gov.ph October 18, 2024 Florante E. Vergara Director Iii/assistant Regional Director Bac Chairman Section Ii. Instructions To Bidders
Closing Soon25 Nov 2024
Tender AmountPHP 132.3 Million (USD 2.2 Million)

Municipality Of Mapanas, Northern Samar Tender

Civil And Construction...+1Civil Works Others
Philippines
Details: Description Bidding Documents Procurement Of Infrastructure Projects Name Of Project: Repair And Rehabilitation Of Mapanas-rhu Barangay Del Norte, Mapanas Northern Samar Contract Reference No. 2024-11-094 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 7 Section Iii. Bid Data Sheet 35 Section Iv. General Conditions Of Contract 38 Section V. Special Conditions Of Contract 70 Section Vi. Specifications 72 Section Vii. Drawings 75 Section Viii. Bill Of Quantities Error! Bookmark Not Defined. Section Ix. Bidding Forms 77 Section X. Foreign-assisted Projects Error! Bookmark Not Defined. Section I. Invitation To Bid Bid Notice Abstract Invitation To Bid (itb) Republic Of The Philippines Province Of Northern Samar Municipality Of Mapanas Invitation To Bid For Project: Repair And Rehabilitation Of Mapanas Rhu, Brgy. Del Norte, Mapanas N. Samar. The Lgu- Mapanas, Northern Samar, Through The Ldrrm Fund Of Fy 2023 Intends To Apply The Sum Of One Million Forty Nine Thousand Pesos 57/100 Only (p1,049,465.57) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For : Repair/rehabilitation Of Mapanas Rhu, Barangay Del Norte, Mapanas N. Samar Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Lgu- Mapanas, Northern Samar Now Invites Bids For The Following Description Of Works To Be Procured: Item No. Scope Of Work Quantity Unit Repair/rehabilitation Of Mapanas Rhu, Barangay Del Norte, Mapanas, N. Samar. B. 5 Project Billboard/signboard 1.00 Lot B.7 Construction Safety And Health 1.00 Lot B.9 Mobilization And Demobilization 1.00 Lot 801(7)a Removal Of Structures And Obstruction 1.00 Is 900(1)c1 Structural Concrete (class A), 28 Days 9.15 Cu.m. 902(1) A Reinforcing Steel, Deformed Grade 40 541.72 Kg 903 Formworks And Falseworks 53.38 Sq.m. 1047 Metal Structures 84.00 In.m 1013 Corrugated Metal Roofing, Gauge 24 9.00 Sq.m. 1046 Masonry Works 75.60 Sq.m. 1003 Carpentry And Joinery Works 38.78 Sq.m. 1005 Doors And Windows 3.00 Sets 1002 Plumbing Works 1.00 Lot 1032 Painting Varnishing And Other Related Works 411.00 Sq.m. 1101 Wires And Wiring Devices 1.00 Is 1002 (1) Panel Board With Main Breaker And Branc 1.00 Is 1103 Lighting Fixtures And Lamps 1.00 Is Spcl1 Signages 1.00 Lot Completion Of The Works Is Required 90 Calendar Days. Bidders Should Have Completed, Within Ten (10) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. Section Ii. Instructions To Bidders. 2. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From Lgu- Bac Mapanas, Northern Samar And Inspect The Bidding Documents At The Address Given Below From November 06, 2024-november 26, 2024, 8:00 A.m. To 5:00 Pm. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of P5,000.00. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later That The Submission Of Their Bids. 5. The Lgu- Mapanas, Northern Samar Will Hold A Pre-bid Conference On November, 15, 2024 At 10:00 A.m. At Executive Conference, 2nd Floor Of New Municipal Bldg. Mapanas, Northern Samar, Which Shall Be Open Only To All Interested Parties Who Have Purchased The Bidding Documents. 6. Bids Must Be Delivered To The Address Below On Or Before 9:00 A.m. Of November 26, 2024 At Bac Office, @ Municipal Planning & Development Office (mpdo), Mapanas, Northern Samar. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bids Will Be Opened In The Presence Of The Bidders’ Authorized Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. The Bidder May Request That The Bid Documents Be Sent To Them By Mail Or Courier, And For This, The Bidder Shall Pay The Amount In Philippine Peso To Cover The Cost Of Mail Or Courier Delivery. The Fee For Obtaining A Copy Of The Bid Documents And The Cost Of Mail Or Courier Shall Be Paid By The Bidder Thru S Cashier’s Check Or Manager’s Check Issued In Favor Of The Municipality Of Mapanas. 7. The Lgu- Mapanas, Northern Samar Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 8. For Further Information, Please Refer To: Reno C. Salazar Bac Secretary Mapanas, Northern Samar Mobile # 09459852914 Ma. Teresa L. Minguez Bac Chairperson Mapanas, Northern Samar Mobile # 09778033758 Section Ii. Instructions To Bidders 1. The Bids Must Be Delivered On Or Before November 26, 2024 At 9:00 A.m And Failure To Submit The Bid Proposal May Ground For Disqualification Of The Bid. 2. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Lgu- Mapanas, Northern Samar Now Invites Bids For The Following Description Of Works To Be Procured: Item No. Scope Of Work Quantity Unit Repair/rehabilitation Of Mapanas Rhu, Barangay Del Norte, Mapanas, N. Samar. B. 5 Project Billboard/signboard 1.00 Lot B.7 Construction Safety And Health 1.00 Lot B.9 Mobilization And Demobilization 1.00 Lot 801(7)a Removal Of Structures And Obstruction 1.00 Is 900(1)c1 Structural Concrete (class A), 28 Days 9.15 Cu.m. 902(1) A Reinforcing Steel, Deformed Grade 40 541.72 Kg 903 Formworks And Falseworks 53.38 Sq.m. 1047 Metal Structures 84.00 In.m 1013 Corrugated Metal Roofing, Gauge 24 9.00 Sq.m. 1046 Masonry Works 75.60 Sq.m. 1003 Carpentry And Joinery Works 38.78 Sq.m. 1005 Doors And Windows 3.00 Sets 1002 Plumbing Works 1.00 Lot 1032 Painting Varnishing And Other Related Works 411.00 Sq.m. 1101 Wires And Wiring Devices 1.00 Is 1002 (1) Panel Board With Main Breaker And Branc 1.00 Is 1103 Lighting Fixtures And Lamps 1.00 Is Spcl1 Signages 1.00 Lot Completion Of The Works Is Required 90 Calendar Days. Bidders Should Have Completed, Within Ten (10) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 2. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 3. Interested Bidders May Obtain Further Information From Lgu- Bac Mapanas, Northern Samar And Inspect The Bidding Documents At The Address Given Below From November 06, 2024-november 25, 2024, 8:00 A.m. To 5:00 Pm. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of P5,000.00. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later That The Submission Of Their Bids. 4. The Lgu- Mapanas, Northern Samar Will Hold A Pre-bid Conference On November 15, 2024 At 10:00 A.m. At Executive Conference, 2nd Floor Of New Municipal Bldg. Mapanas, Northern Samar, Which Shall Be Open Only To All Interested Parties Who Have Purchased The Bidding Documents. 5. Bids Must Be Delivered To The Address Below On Or Before 9:00 A.m. Of November 26, 2024 At Bac Office, @ Municipal Planning & Development Office (mpdo), Mapanas, Northern Samar. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bids Will Be Opened In The Presence Of The Bidders’ Authorized Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. The Bidder May Request That The Bid Documents Be Sent To Them By Mail Or Courier, And For This, The Bidder Shall Pay The Amount In Philippine Peso To Cover The Cost Of Mail Or Courier Delivery. The Fee For Obtaining A Copy Of The Bid Documents And The Cost Of Mail Or Courier Shall Be Paid By The Bidder Thru S Cashier’s Check Or Manager’s Check Issued In Favor Of The Municipality Of Mapanas. 6. The Lgu- Mapanas, Northern Samar Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 7. For Further Information, Please Refer To: Reno C. Salazar Bac Secretary Mapanas, Northern Samar Mobile # 09459852914 Ma. Teresa L. Minguez Bac Chairperson Mapanas N. Samar Mobile # 09778033758 Table Of Contents A. General 11 1. Scope Of Bid 11 2. Source Of Funds 11 3. Corrupt, Fraudulent, Collusive, And Coercive Practices 11 4. Conflict Of Interest 12 5. Eligible Bidders 14 6. Bidder’s Responsibilities 15 7. Origin Of Goods And Services 17 8. Subcontracts 17 B. Contents Of Bidding Documents 17 9. Pre-bid Conference 17 10. Clarification And Amendment Of Bidding Documents 18 C. Preparation Of Bids 18 11. Language Of Bids 18 12. Documents Comprising The Bid: Eligibility And Technical Components 18 13. Documents Comprising The Bid: Financial Component 21 14. Alternative Bids 21 15. Bid Prices 22 16. Bid Currencies 22 17. Bid Validity 23 18. Bid Security 23 19. Format And Signing Of Bids 25 20. Sealing And Marking Of Bids 26 D. Submission And Opening Of Bids 26 21. Deadline For Submission Of Bids 26 22. Late Bids 26 23. Modification And Withdrawal Of Bids 27 24. Opening And Preliminary Examination Of Bids 27 E. Evaluation And Comparison Of Bids 28 25. Process To Be Confidential 28 26. Clarification Of Bids 29 27. Detailed Evaluation And Comparison Of Bids 29 28. Post Qualification 30 29. Reservation Clause 31 F. Award Of Contract 32 30. Contract Award 32 31. Signing Of The Contract 33 32. Performance Security 33 33. Notice To Proceed 34 A. General 1. Scope Of Bid 1.1. The Procuring Entity As Defined In The Bds, Invites Bids For The Construction Of Works, As Described In Section Vi. Specifications. The Name And Identification Number Of The Contract Is Provided In The Bds. 1.2. The Successful Bidder Will Be Expected To Complete The Works By The Intended Completion Date Specified In Scc Clause 1.16. 2. Source Of Funds The Procuring Entity Has A Budget Or Has Applied For Or Received Funds From The Funding Source Named In The Bds, And In The Amount Indicated In The Bds. It Intends To Apply Part Of The Funds Received For The Project, As Defined In The Bds, To Cover Eligible Payments Under The Contract For The Works. 3. Corrupt, Fraudulent, Collusive, And Coercive Practices 3.1. Unless Otherwise Specified In The Bds, The Procuring Entity, As Well As Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. In Pursuance Of This Policy, The Funding Source: (a) Defines, For Purposes Of This Provision, The Terms Set Forth Below As Follows: (i) "corrupt Practice" Means Behavior On The Part Of Officials In The Public Or Private Sectors By Which They Improperly And Unlawfully Enrich Themselves, Others, Or Induce Others To Do So, By Misusing The Position In Which They Are Placed, And Includes The Offering, Giving, Receiving, Or Soliciting Of Anything Of Value To Influence The Action Of Any Such Official In The Procurement Process Or In Contract Execution; Entering, On Behalf Of The Procuring Entity, Into Any Contract Or Transaction Manifestly And Grossly Disadvantageous To The Same, Whether Or Not The Public Officer Profited Or Will Profit Thereby, And Similar Acts As Provided In Republic Act 3019; (ii) "fraudulent Practice" Means A Misrepresentation Of Facts In Order To Influence A Procurement Process Or The Execution Of A Contract To The Detriment Of The Procuring Entity, And Includes Collusive Practices Among Bidders (prior To Or After Bid Submission) Designed To Establish Bid Prices At Artificial, Non-competitive Levels And To Deprive The Procuring Entity Of The Benefits Of Free And Open Competition; (iii) “collusive Practices” Means A Scheme Or Arrangement Between Two Or More Bidders, With Or Without The Knowledge Of The Procuring Entity, Designed To Establish Bid Prices At Artificial, Non-competitive Levels; And (iv) “coercive Practices” Means Harming Or Threatening To Harm, Directly Or Indirectly, Persons, Or Their Property To Influence Their Participation In A Procurement Process, Or Affect The Execution Of A Contract; (v) “obstructive Practice” Is (aa) Deliberately Destroying, Falsifying, Altering Or Concealing Of Evidence Material To An Administrative Proceedings Or Investigation Or Making False Statements To Investigators In Order To Materially Impede An Administrative Proceedings Or Investigation Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Into Allegations Of A Corrupt, Fraudulent, Coercive Or Collusive Practice; And/or Threatening, Harassing Or Intimidating Any Party To Prevent It From Disclosing Its Knowledge Of Matters Relevant To The Administrative Proceedings Or Investigation Or From Pursuing Such Proceedings Or Investigation; Or (bb) Acts Intended To Materially Impede The Exercise Of The Inspection And Audit Rights Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Herein. (b) Will Reject A Proposal For Award If It Determines That The Bidder Recommended For Award Has Engaged In Corrupt Or Fraudulent Practices In Competing For The Contract; And (c) Will Declare A Firm Ineligible, Either Indefinitely Or For A Stated Period Of Time, To Be Awarded Contract Funded By The Funding Source If It At Any Time Determines That The Firm Has Engaged In Corrupt Or Fraudulent Practices In Competing Or, Or In Executing, A Contract Funded By The Funding Source. 3.2. Further, The Procuring Entity Will Seek To Impose The Maximum Civil, Administrative, And/or Criminal Penalties Available Under The Applicable Laws On Individuals And Organizations Deemed To Be Involved In Any Of The Practices Mentioned In Itb Clause 3.1(a). 3.3. Furthermore, The Funding Source And The Procuring Entity Reserve The Right To Inspect And Audit Records And Accounts Of A Contractor In The Bidding For And Performance Of A Contract Themselves Or Through Independent Auditors As Reflected In The Gcc Clause 34. 4. Conflict Of Interest 4.1. All Bidders Found To Have Conflicting Interests Shall Be Disqualified To Participate In The Procurement At Hand, Without Prejudice To The Imposition Of Appropriate Administrative, Civil, And Criminal Sanctions. A Bidder May Be Considered To Have Conflicting Interests With Another Bidder In Any Of The Events Described In Paragraphs (a) Through (c) And A General Conflict Of Interest In Any Of The Circumstances Set Out In Paragraphs (d) Through (g) Below: (a) A Bidder Has Controlling Shareholders In Common With Another Bidder; (b) A Bidder Receives Or Has Received Any Direct Or Indirect Subsidy From Any Other Bidder; (c) A Bidder Has The Same Legal Representative As That Of Another Bidder For Purposes Of This Bid; (d) A Bidder Has A Relationship, Directly Or Through Third Parties, That Puts Them In A Position To Have Access To Information About Or Influence On The Bid Of Another Bidder Or Influence The Decisions Of The Procuring Entity Regarding This Bidding Process. This Will Include A Firm Or An Organization Who Lends, Or Temporarily Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement For Or Implementation Of The Project If The Personnel Would Be Involved In Any Capacity On The Same Project; (e) A Bidder Submits More Than One Bid In This Bidding Process. However, This Does Not Limit The Participation Of Subcontractors In More Than One Bid; (f) A Bidder Who Participated As A Consultant In The Preparation Of The Design Or Technical Specifications Of The Goods And Related Services That Are The Subject Of The Bid; Or (g) A Bidder Who Lends, Or Temporary Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement For Or Implementation Of The Project, If The Personnel Would Be Involved In Any Capacity On The Same Project. 4.2. In Accordance With Section 47 Of The Irr Of Ra 9184, All Bidding Documents Shall Be Accompanied By A Sworn Affidavit Of The Bidder That It Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), Members Of The Technical Working Group (twg), Members Of The Bac Secretariat, The Head Of The Project Management Office (pmo) Or The End-user Unit, And The Project Consultants, By Consanguinity Or Affinity Up To The Third Civil Degree. On The Part Of The Bidder, This Clause Shall Apply To The Following Persons: (a) If The Bidder Is An Individual Or A Sole Proprietorship, To The Bidder Himself; (b) If The Bidder Is A Partnership, To All Its Officers And Members; (c) If The Bidder Is A Corporation, To All Its Officers, Directors, And Controlling Stockholders; And (d) If The Bidder Is A Joint Venture (jv), The Provisions Of Items (a), (b), Or (c) Of This Clause Shall Correspondingly Apply To Each Of The Members Of The Said Jv, As May Be Appropriate. Relationship Of The Nature Described Above Or Failure To Comply With This Clause Will Result In The Automatic Disqualification Of A Bidder. 5. Eligible Bidders 5.1. Unless Otherwise Indicated In The Bds, The Following Persons Shall Be Eligible To Participate In This Bidding: (a) Duly Licensed Filipino Citizens/sole Proprietorships; (b) Partnerships Duly Organized Under The Laws Of The Philippines And Of Which At Least Seventy Five Percent (75%) Of The Interest Belongs To Citizens Of The Philippines; (c) Corporations Duly Organized Under The Laws Of The Philippines, And Of Which At Least Seventy Five Percent (75%) Of The Outstanding Capital Stock Belongs To Citizens Of The Philippines; (d) Cooperatives Duly Organized Under The Laws Of The Philippines, And Of Which At Least Seventy Five Percent (75%) Of The Interest Belongs To Citizens Of The Philippines; And (e) Persons/entities Forming Themselves Into A Jv, I.e., A Group Of Two (2) Or More Persons/entities That Intend To Be Jointly And Severally Responsible Or Liable For A Particular Contract: Provided, However, That, In Accordance With Letter Of Instructions No. 630, Filipino Ownership Or Interest Of The Joint Venture Concerned Shall Be At Least Seventy Five Percent (75%): Provided, Further, That Joint Ventures In Which Filipino Ownership Or Interest Is Less Than Seventy Five Percent (75%) May Be Eligible Where The Structures To Be Built Require The Application Of Techniques And/or Technologies Which Are Not Adequately Possessed By A Person/entity Meeting The Seventy Five Percent (75%) Filipino Ownership Requirement: Provided, Finally, That In The Latter Case, Filipino Ownership Or Interest Shall Not Be Less Than Twenty Five Percent (25%). For This Purpose Filipino Ownership Or Interest Shall Be Based On The Contributions Of Each Of The Members Of The Joint Venture As Specified In Their Jva. 5.2. The Procuring Entity May Also Invite Foreign Bidders When Provided For Under Any Treaty Or International Or Executive Agreement As Specified In The Bds. 5.3. Government Corporate Entities May Be Eligible To Participate Only If They Can Establish That They (a) Are Legally And Financially Autonomous, (b) Operate Under Commercial Law, And (c) Are Not Dependent Agencies Of The Gop Or The Procuring Entity. 5.4. (a) Unless Otherwise Provided In The Bds, The Bidder Must Have Completed, Within Ten (10) Years From The Submission Of Bids, A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted To Current Prices Using The National Statistics Office Consumer Price Index. (b) For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bds. For This Purpose, Contracts Similar To The Project Shall Be Those Described In Thebds, And Completed Within The Period Stated In The Invitation To Bid And Itb Clause 12.1(a)(iii). 5.5. The Bidder Must Submit A Computation Of Its Net Financial Contracting Capacity (nfcc) Or A Commitment From A Universal Or Commercial Bank To Extend A Credit Line In Its Favor If Awarded The Contract For This Project (clc). The Nfcc, Computed Using The Following Formula, Must Be At Least Equal To The Abc To Be Bid: Nfcc = [(current Assets Minus Current Liabilities) (k)] Minus The Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Ongoing Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project. Where: K = 10 For A Contract Duration Of One Year Or Less, 15 For A Contract Duration Of More Than One Year Up To Two Years, And 20 For A Contract Duration Of More Than Two Years. The Clc Must Be At Least Equal To Ten Percent (10%) Of The Abc For This Project. If Issued By A Foreign Bank, It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank. In The Case Of Local Government Units (lgus), The Bidder May Also Submit Clc From Other Banks Certified By The Bangko Sentral Ng Pilipinas (bsp) As Authorized To Issue Such Financial Instrument. 6. Bidder’s Responsibilities 6.1. The Bidder Or Its Duly Authorized Representative Shall Submit A Sworn Statement In The Form Prescribed In Section Ix. Bidding Forms As Required In Itb Clause 12.1(b)(iii). 6.2. The Bidder Is Responsible For The Following: (a) Having Taken Steps To Carefully Examine All Of The Bidding Documents; (b) Having Acknowledged All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; (c) Having Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; (d) Having Complied With Its Responsibility To Inquire Or Secure Supplemental/bid Bulletin/s As Provided Under Itb Clause 10.3. (e) Ensuring That It Is Not “blacklisted” Or Barred From Bidding By The Gop Or Any Of Its Agencies, Offices, Corporations, Or Lgus, Including Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Gppb; (f) Ensuring That Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; (g) Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative/s To Verify All The Documents Submitted; (h) Ensuring That The Signatory Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary And/or To Represent The Bidder In The Bidding, With The Duly Notarized Secretary’s Certificate Attesting To Such Fact, If The Bidder Is A Corporation, Partnership, Cooperative, Or Joint Venture; (i) Complying With The Disclosure Provision Under Section 47 Of The Act In Relation To Other Provisions Of Republic Act 3019; And (j) Complying With Existing Labor Laws And Standards, If Applicable. Failure To Observe Any Of The Above Responsibilities Shall Be At The Risk Of The Bidder Concerned. 6.3. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contract Works And The Conditions For This Project And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 6.4. It Shall Be The Sole Responsibility Of The Prospective Bidder To Determine And To Satisfy Itself By Such Means As It Considers Necessary Or Desirable As To All Matters Pertaining To This Project, Including: (a) The Location And The Nature Of The Contract, Project, Or Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work. 6.5. The Procuring Entity Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Or Conclusions By The Prospective Or Eligible Bidder Out Of The Data Furnished By The Procuring Entity. 6.6. Before Submitting Their Bids, The Bidders Are Deemed To Have Become Familiar With All Existing Laws, Decrees, Ordinances, Acts And Regulations Of The Philippines Which May Affect The Contract In Any Way. 6.7. The Bidder Shall Bear All Costs Associated With The Preparation And Submission Of His Bid, And The Procuring Entity Will In No Case Be Responsible Or Liable For Those Costs, Regardless Of The Conduct Or Outcome Of The Bidding Process. 6.8. Bidders Should Note That The Procuring Entity Will Only Accept Bids Only From Those That Have Paid The Nonrefundable Fee For The Bidding Documents At The Office Indicated In The Invitation To Bid. 7. Origin Of Goods And Services There Is No Restriction On The Origin Of Goods, Or Contracting Of Works Or Services Other Than Those Prohibited By A Decision Of The United Nations Security Council Taken Under Chapter Vii Of The Charter Of The United Nations. 8. Subcontracts 8.1. Unless Otherwise Specified In The Bds, The Bidder May Subcontract Portions Of The Works To An Extent As May Be Approved By The Procuring Entity And Stated In The Bds. However, Subcontracting Of Any Portion Shall Not Relieve The Bidder From Any Liability Or Obligation That May Arise From The Contract For This Project. 8.2. Subcontractors Must Submit The Documentary Requirements Under Itb Clause 12 And Comply With The Eligibility Criteria Specified In The Bds. In The Event That Any Subcontractor Is Found By The Procuring Entity To Be Ineligible, The Subcontracting Of Such Portion Of The Works Shall Be Disallowed. 8.3. The Bidder May Identify The Subcontractor To Whom A Portion Of The Works Will Be Subcontracted At Any Stage Of The Bidding Process Or During Contract Implementation. If The Bidder Opts To Disclose The Name Of The Subcontractor During Bid Submission, The Bidder Shall Include The Required Documents As Part Of The Technical Component Of Its Bid. B. Contents Of Bidding Documents 9. Pre-bid Conference 9.1. (a) If So Specified In The Bds, A Pre-bid Conference Shall Be Held At The Venue And On The Date Indicated Therein, To Clarify And Address The Bidders’ Questions On The Technical And Financial Components Of This Project. (b) The Pre-bid Conference Shall Be Held At Least Twelve (12) Calendar Days Before The Deadline For The Submission Of And Receipt Of Bids. If The Procuring Entity Determines That, By Reason Of The Method, Nature, Or Complexity Of The Contract To Be Bid, Or When International Participation Will Be More Advantageous To The Gop, A Longer Period For The Preparation Of Bids Is Necessary, The Pre-bid Conference Shall Be Held At Least Thirty (30) Calendar Days Before The Deadline For The Submission And Receipt Of Bids, As Specified In The Bds. 9.2. Bidders Are Encouraged To Attend The Pre-bid Conference To Ensure That They Fully Understand The Procuring Entity’s Requirements. Non-attendance Of The Bidder Will In No Way Prejudice Its Bid; However, The Bidder Is Expected To Know The Changes And/or Amendments To The Bidding Documents As Recorded In The Minutes Of The Pre-bid Conference And The Supplemental/bid Bulletin. 9.3. Any Statement Made At The Pre-bid Conference Shall Not Modify The Terms Of The Bidding Documents Unless Such Statement Is Specifically Identified In Writing As An Amendment Thereto And Issued As A Supplemental/bid Bulletin. 10. Clarification And Amendment Of Bidding Documents 10.1. Bidders Who Have Purchased The Bidding Documents May Request For Clarification(s) On Any Part Of The Bidding Documents Or For An Interpretation. Such A Request Must Be In Writing And Submitted To The Procuring Entity At The Address Indicated In The Bds At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10.2. Supplemental/bid Bulletins May Be Issued Upon The Procuring Entity’s Initiative For Purposes Of Clarifying Or Modifying Any Provision Of The Bidding Documents Not Later Than Seven (7) Calendar Days Before The Deadline For The Submission And Receipt Of Bids. Any Modification To The Bidding Documents Shall Be Identified As An Amendment. 10.3. Any Supplemental/bid Bulletin Issued By The Bac Shall Also Be Posted On The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity Concerned, If Available. Unless, Otherwise Provided In The Bds, It Shall Be The Responsibility Of All Bidders Who Secure The Bidding Documents To Inquire And Secure Supplemental/bid Bulletins That May Be Issued By The Bac. However, Bidders Who Have Submitted Bids Before The Issuance Of The Supplemental/bid Bulletin Must Be Informed And Allowed To Modify Or Withdraw Their Bids In Accordance With Itb Clause 23. C. Preparation Of Bids 11. Language Of Bids The Bid, As Well As All Correspondence And Documents Relating To The Bid Exchanged By The Bidder And The Procuring Entity, Shall Be Written In English. Supporting Documents And Printed Literature Furnished By The Bidder May Be In Another Language Provided They Are Accompanied By An Accurate Translation In English Certified By The Appropriate Embassy Or Consulate In The Philippines, In Which Case The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 12. Documents Comprising The Bid: Eligibility And Technical Components 12.1. Unless Otherwise Indicated In The Bds, The First Envelope Shall Contain The Following Eligibility And Technical Documents: (a) Eligibility Documents – Class "a" Documents: (i) Registration Certificate From The Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives, Or Any Proof Of Such Registration As Stated In The Bds; (ii) Mayor’s Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located; (iii) Statement Of All Its Ongoing And Completed Government And Private Contracts Within Ten (10) Years From The Submission Of Bids, Including Contracts Awarded But Not Yet Started, If Any. The Statement Shall Include, For Each Contract, The Following: (iii.1) Name Of The Contract; (iii.2) Date Of The Contract; (iii.3) Contract Duration; (iii.4) Owner’s Name And Address; (iii.5) Nature Of Work; (iii.6) Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation; (iii.7) Total Contract Value At Award; (iii.8) Date Of Completion Or Estimated Completion Time; (iii.9) Total Contract Value At Completion, If Applicable; (iii.10) Percentages Of Planned And Actual Accomplishments, If Applicable; (iii.11) Value Of Outstanding Works, If Applicable; (iii.12) The Statement Shall Be Supported By The Notices Of Award And/or Notices To Proceed Issued By The Owners; And (iii.13) The Statement Shall Be Supported By The Constructors Performance Evaluation System (cpes) Rating Sheets, And/or Certificates Of Completion And Owner’s Acceptance, If Applicable; (iv) Unless Otherwise Provided In The Bds, Valid Philippine Contractors Accreditation Board (pcab) License And Registration For The Type And Cost Of The Contract For This Project; (v) Audited Financial Statements, Showing, Among Others, The Prospective Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; (vi) Nfcc Computation Or Clc In Accordance With Itb Clause 5.5; And Class "b" Document: (vii) If Applicable, Valid Joint Venture Agreement (jva) Or, In Lieu Thereof, Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful Shall Be Included In The Bid. (b) Technical Documents – (i) Bid Security As Prescribed In Itb Clause 18. If The Bidder Opts To Submit The Bid Security In The Form Of: (i.1) A Bank Draft/guarantee Or An Irrevocable Letter Of Credit Issued By A Foreign Bank, It Shall Be Accompanied By A Confirmation From A Universal Or Commercial Bank; Or (i.2) A Surety Bond Accompanied By A Certification Coming From An Authorized Insurance Commission That A Surety Or Insurance Company Is Authorized To Issue Such Instrument; (ii) Project Requirements, Which Shall Include The Following: (ii.1) Organizational Chart For The Contract To Be Bid; (ii.2) List Of Contractor’s Personnel (viz, Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; And (ii.3) List Of Contractor’s Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project; And (iii) Sworn Statement In Accordance With Section 25.2(b)(iv) Of The Irr Of Ra 9184 And Using The Form Prescribed In Section Ix. Bidding Forms. 13. Documents Comprising The Bid: Financial Component 13.1. Unless Otherwise Stated In The Bds, The Financial Component Of The Bid Shall Contain The Following: (a) Financial Bid Form In Accordance With The Form Prescribed In Section Ix. Bidding Forms; And (b) Any Other Document Related To The Financial Component Of The Bid As Stated In The Bds. 13.2. (a) Unless Indicated In The Bds, All Bids That Exceed The Abc Shall Not Be Accepted. (b) Unless Otherwise Indicated In The Bds, For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Following Conditions Are Met: (i) Bidding Documents Are Obtainable Free Of Charge On A Freely Accessible Website. If Payment Of Bidding Documents Is Required By The Procuring Entity, Payment Could Be Made Upon The Submission Of Bids. (ii) The Procuring Entity Has Procedures In Place To Ensure That The Abc Is Based On Recent Estimates Made By The Engineer Or The Responsible Unit Of The Procuring Entity And That The Estimates Are Based On Adequate Detailed Engineering (in The Case Of Works) And Reflect The Quality, Supervision And Risk And Inflationary Factors, As Well As Prevailing Market Prices, Associated With The Types Of Works Or Goods To Be Procured. (iii) The Procuring Entity Has Trained Cost Estimators On Estimating Prices And Analyzing Bid Variances. In The Case Of Infrastructure Projects, The Procuring Entity Must Also Have Trained Quantity Surveyors. (iv) The Procuring Entity Has Established A System To Monitor And Report Bid Prices Relative To Abc And Engineer’s/procuring Entity’s Estimate. (v) The Procuring Entity Has Established A Monitoring And Evaluation System For Contract Implementation To Provide A Feedback On Actual Total Costs Of Goods And Works. 14. Alternative Bids 14.1. Alternative Bids Shall Be Rejected. For This Purpose, Alternative Bid Is An Offer Made By A Bidder In Addition Or As A Substitute To Its Original Bid Which May Be Included As Part Of Its Original Bid Or Submitted Separately Therewith For Purposes Of Bidding. A Bid With Options Is Considered An Alternative Bid Regardless Of Whether Said Bid Proposal Is Contained In A Single Envelope Or Submitted In Two (2) Or More Separate Bid Envelopes. 14.2. Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 14.3. Each Bidder Shall Submit Only One Bid, Either Individually Or As A Partner In A Jv. A Bidder Who Submits Or Participates In More Than One Bid (other Than As A Subcontractor If A Subcontractor Is Permitted To Participate In More Than One Bid) Will Cause All The Proposals With The Bidder’s Participation To Be Disqualified. This Shall Be Without Prejudice To Any Applicable Criminal, Civil And Administrative Penalties That May Be Imposed Upon The Persons And Entities Concerned. 15. Bid Prices 15.1. The Contract Shall Be For The Whole Works, As Described In Itb Clause 1.1, Based On The Priced Bill Of Quantities Submitted By The Bidder. 15.2. The Bidder Shall Fill In Rates And Prices For All Items Of The Works Described In The Bill Of Quantities. Bids Not Addressing Or Providing All Of The Required Items In The Bidding Documents Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A "0" (zero) For The Said Item Would Mean That It Is Being Offered For Free To The Government. 15.3. All Duties, Taxes, And Other Levies Payable By The Contractor Under The Contract, Or For Any Other Cause, Prior To The Deadline For Submission Of Bids, Shall Be Included In The Rates, Prices, And Total Bid Price Submitted By The Bidder. 15.4. All Bid Prices For The Given Scope Of Work In The Contract As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Specified In Gcc Clause 48. Price Escalation May Be Allowed In Extraordinary Circumstances As May Be Determined By The National Economic And Development Authority In Accordance With The Civil Code Of The Philippines, And Upon The Recommendation Of The Procuring Entity. Furthermore, In Cases Where The Cost Of The Awarded Contract Is Affected By Any Applicable New Laws, Ordinances, Regulations, Or Other Acts Of The Gop, Promulgated After The Date Of Bid Opening, A Contract Price Adjustment Shall Be Made Or Appropriate Relief Shall Be Applied On A No Loss-no Gain Basis. 16. Bid Currencies 16.1. All Bid Prices Shall Be Quoted In Philippine Pesos Unless Otherwise Provided In The Bds. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate Prevailing On The Day Of The Bid Opening. 16.2. If So Allowed In Accordance With Itb Clause 16.1, The Procuring Entity For Purposes Of Bid Evaluation And Comparing The Bid Prices Will Convert The Amounts In Various Currencies In Which The Bid Price Is Expressed To Philippine Pesos At The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 16.3. Unless Otherwise Specified In The Bds, Payment Of The Contract Price Shall Be Made In Philippine Pesos. 17. Bid Validity 17.1. Bids Shall Remain Valid For The Period Specified In The Bds Which Shall Not Exceed One Hundred Twenty (120) Calendar Days From The Date Of The Opening Of Bids. 17.2. In Exceptional Circumstances, Prior To The Expiration Of The Bid Validity Period, The Procuring Entity May Request Bidders To Extend The Period Of Validity Of Their Bids. The Request And The Responses Shall Be Made In Writing. The Bid Security Described In Itb Clause 18 Should Also Be Extended Corresponding To The Extension Of The Bid Validity Period At The Least. A Bidder May Refuse The Request Without Forfeiting Its Bid Security, But His Bid Shall No Longer Be Considered For Further Evaluation And Award. A Bidder Granting The Request Shall Not Be Required Or Permitted To Modify Its Bid. 18. Bid Security 18.1. The Bid Security In The Amount Stated In The Bds Shall Be Equal To The Percentage Of The Abc In Accordance With The Following Schedule: Form Of Bid Security Amount Of Bid Security (equal To Percentage Of The Abc) (a) Cash Or Cashier’s/manager’s Check Issued By A Universal Or Commercial Bank. Two Percent (2%) (b) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank. (c) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security; And/or Five Percent (5%) (d) Any Combination Of The Foregoing. Proportionate To Share Of Form With Respect To Total Amount Of Security For Biddings Conducted By Local Government Units, The Bidder May Also Submit Bid Securities In The Form Of Cashier’s/manager’s Check, Bank Draft/guarantee, Or Irrevocable Letter Of Credit From Other Banks Certified By The Bsp As Authorized To Issue Such Financial Statement. 18.2. The Bid Security Should Be Valid For The Period Specified In The Bds. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 18.3. No Bid Securities Shall Be Returned To Bidders After The Opening Of Bids And Before Contract Signing, Except To Those That Failed Or Declared As Post-disqualified, Upon Submission Of A Written Waiver Of Their Right To File A Motion For Reconsideration And/or Protest. Without Prejudice On Its Forfeiture, Bid Securities Shall Be Returned Only After The Bidder With The Lowest Calculated Responsive Bid Has Signed The Contract And Furnished The Performance Security, But In No Case Later Than The Expiration Of The Bid Security Validity Period Indicated In Itb Clause 18.2. 18.4. Upon Signing And Execution Of The Contract, Pursuant To Itb Clause 31, And The Posting Of The Performance Security, Pursuant To Itb Clause 32, The Successful Bidder’s Bid Security Will Be Discharged, But In No Case Later Than The Bid Security Validity Period As Indicated In Itb Clause 18.2. 18.5. The Bid Security May Be Forfeited: (a) If A Bidder: (i) Withdraws Its Bid During The Period Of Bid Validity Specified In Itb Clause 17; (ii) Does Not Accept The Correction Of Errors Pursuant To Itb Clause 27.3(b); (iii) Fails To Submit The Requirements Within The Prescribed Period, Or A Finding Against Their Veracity, As Stated In Itb Clause 28.2; (iv) Submission Of Eligibility Requirements Containing False Information Or Falsified Documents; (v) Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding; (vi) Allowing The Use Of One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding; (vii) Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid; (viii) Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time; (ix) Refusal To Clarify Or Validate In Writing Its Bid During Post-qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification; (x) Any Documented Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor; (xi) Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared Successful; Or (xii) All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons. (b) If The Successful Bidder: (i) Fails To Sign The Contract In Accordance With Itb Clause 31; (ii) Fails To Furnish Performance Security In Accordance With Itb Clause 32. 19. Format And Signing Of Bids 19.1. Bidders Shall Submit Their Bids Through Their Duly Authorized Representative Using The Appropriate Forms Provided In Section Ix. Bidding Forms On Or Before The Deadline Specified In The Itb Clause 21 In Two (2) Separate Sealed Bid Envelopes, And Which Shall Be Submitted Simultaneously. The First Shall Contain The Technical Component Of The Bid, Including The Eligibility Requirements Under Itb Clause 12.1, And The Second Shall Contain The Financial Component Of The Bid. 19.2. Forms As Mentioned In Itb Clause 19.1 Must Be Completed Without Any Alterations To Their Format, And No Substitute Form Shall Be Accepted. All Blank Spaces Shall Be Filled In With The Information Requested. 19.3. The Bidder Shall Prepare An Original Of The First And Second Envelopes As Described In Itb Clauses 12 And 13. In Addition, The Bidder Shall Submit Copies Of The First And Second Envelopes. In The Event Of Any Discrepancy Between The Original And The Copies, The Original Shall Prevail. 19.4. The Bid, Except For Unamended Printed Literature, Shall Be Signed, And Each And Every Page Thereof Shall Be Initialed, By The Duly Authorized Representative/s Of The Bidder. 19.5. Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By The Duly Authorized Representative/s Of The Bidder. 20. Sealing And Marking Of Bids 20.1. Bidders Shall Enclose Their Original Eligibility And Technical Documents Described In Itb Clause 12, In One Sealed Envelope Marked “original - Technical Component”, And The Original Of Their Financial Component In Another Sealed Envelope Marked “original - Financial Component”, Sealing Them All In An Outer Envelope Marked “original Bid”. 20.2. Each Copy Of The First And Second Envelopes Shall Be Similarly Sealed Duly Marking The Inner Envelopes As “copy No. ___ - Technical Component” And “copy No. ___ – Financial Component” And The Outer Envelope As “copy No. ___”, Respectively. These Envelopes Containing The Original And The Copies Shall Then Be Enclosed In One Single Envelope. 20.3. The Original And The Number Of Copies Of The Bid As Indicated In The Bds Shall Be Typed Or Written In Indelible Ink And Shall Be Signed By The Bidder Or Its Duly Authorized Representative/s. 20.4. All Envelopes Shall: (a) Contain The Name Of The Contract To Be Bid In Capital Letters; (b) Bear The Name And Address Of The Bidder In Capital Letters; (c) Be Addressed To The Procuring Entity’s Bac Identified In Itb Clause 10.1; (d) Bear The Specific Identification Of This Bidding Process Indicated In The Invitation To Bid; And (e) Bear A Warning “do Not Open Before…” The Date And Time For The Opening Of Bids, In Accordance With Itb Clause 21. 20.5. If Bids Are Not Sealed And Marked As Required, The Procuring Entity Will Assume No Responsibility For The Misplacement Or Premature Opening Of The Bid. D. Submission And Opening Of Bids 21. Deadline For Submission Of Bids Bids Must Be Received By The Procuring Entity’s Bac At The Address And On Or Before The Date And Time Indicated In The Bds. 22. Late Bids Any Bid Submitted After The Deadline For Submission And Receipt Of Bids Prescribed By The Procuring Entity, Pursuant To Itb Clause 21, Shall Be Declared “late” And Shall Not Be Accepted By The Procuring Entity. 23. Modification And Withdrawal Of Bids 23.1. The Bidder May Modify Its Bid After It Has Been Submitted; Provided That The Modification Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. The Bidder Shall Not Be Allowed To Retrieve Its Original Bid, But Shall Be Allowed To Submit Another Bid Equally Sealed, Properly Identified, Linked To Its Original Bid Marked As “technical Modification” Or “financial Modification” And Stamped “received” By The Bac. Bid Modifications Received After The Applicable Deadline Shall Not Be Considered And Shall Be Returned To The Bidder Unopened. 23.2. A Bidder May, Through A Letter Of Withdrawal, Withdraw Its Bid After It Has Been Submitted, For Valid And Justifiable Reason; Provided That The Letter Of Withdrawal Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. 23.3. Bids Requested To Be Withdrawn In Accordance With Itb Clause 23.1 Shall Be Returned Unopened To The Bidders. A Bidder May Also Express Its Intention Not To Participate In The Bidding Through A Letter Which Should Reach And Be Stamped By The Bac Before The Deadline For Submission And Receipt Of Bids. A Bidder That Withdraws Its Bid Shall Not Be Permitted To Submit Another Bid, Directly Or Indirectly, For The Same Contract. 23.4. No Bid May Be Modified After The Deadline For Submission Of Bids. No Bid May Be Withdrawn In The Interval Between The Deadline For Submission Of Bids And The Expiration Of The Period Of Bid Validity Specified By The Bidder On The Financial Bid Form. Withdrawal Of A Bid During This Interval Shall Result In The Forfeiture Of The Bidder’s Bid Security, Pursuant To Itb Clause 18.5, And The Imposition Of Administrative, Civil, And Criminal Sanctions As Prescribed By Ra 9184 And Its Irr. 24. Opening And Preliminary Examination Of Bids 24.1. The Bac Shall Open The First Bid Envelopes Of Bidders In Public As Specified In The Bds To Determine Each Bidder’s Compliance With The Documents Prescribed In Itb Clause 12. For This Purpose, The Bac Shall Check The Submitted Documents Of Each Bidder Against A Checklist Of Required Documents To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion. If A Bidder Submits The Required Document, It Shall Be Rated “passed” For That Particular Requirement. In This Regard, Bids That Fail To Include Any Requirement Or Are Incomplete Or Patently Insufficient Shall Be Considered As “failed”. Otherwise, The Bac Shall Rate The Said First Bid Envelope As “passed”. 24.2. Unless Otherwise Specified In The Bds, Immediately After Determining Compliance With The Requirements In The First Envelope, The Bac Shall Forthwith Open The Second Bid Envelope Of Each Remaining Eligible Bidder Whose First Bid Envelope Was Rated “passed”. The Second Envelope Of Each Complying Bidder Shall Be Opened Within The Same Day. In Case One Or More Of The Requirements In The Second Envelope Of A Particular Bid Is Missing, Incomplete Or Patently Insufficient, And/or If The Submitted Total Bid Price Exceeds The Abc Unless Otherwise Provided In Itb Clause 13.1(b), The Bac Shall Rate The Bid Concerned As “failed”. Only Bids That Are Determined To Contain All The Bid Requirements For Both Components Shall Be Rated “passed” And Shall Immediately Be Considered For Evaluation And Comparison. 24.3. Letters Of Withdrawal Shall Be Read Out And Recorded During Bid Opening, And The Envelope Containing The Corresponding Withdrawn Bid Shall Be Returned To The Bidder Unopened. If The Withdrawing Bidder’s Representative Is In Attendance, The Original Bid And All Copies Thereof Shall Be Returned To The Representative During The Bid Opening. If The Representative Is Not In Attendance, The Bid Shall Be Returned Unopened By Registered Mail. The Bidder May Withdraw Its Bid Prior To The Deadline For The Submission And Receipt Of Bids, Provided That The Corresponding Letter Of Withdrawal Contains A Valid Authorization Requesting For Such Withdrawal, Subject To Appropriate Administrative Sanctions. 24.4. If A Bidder Has Previously Secured A Certification From The Procuring Entity To The Effect That It Has Previously Submitted The Above-enumerated Class “a” Documents, The Said Certification May Be Submitted In Lieu Of The Requirements Enumerated In Itb Clause 12.1(a), Items (i) To (vi). 24.5. In The Case Of An Eligible Foreign Bidder As Described In Itb Clause 5, The Class “a” Documents Enumerated In Itb Clause 12.1(a) May Be Substituted With The Appropriate Equivalent Documents, If Any, Issued By The Country Of The Foreign Bidder Concerned. 24.6. Each Partner Of A Joint Venture Agreement Shall Likewise Submit The Documents Required In Itb Clauses 12.1(a)(i) And 12.1(a)(ii). Submission Of Documents Required Under Itb Clauses 12.1(a)(iii) To 12.1(a)(vi) By Any Of The Joint Venture Partners Constitutes Compliance. 24.7. A Bidder Determined As “failed” Has Three (3) Calendar Days Upon Written Notice Or, If Present At The Time Of Bid Opening, Upon Verbal Notification Within Which To File A Request For Reconsideration With The Bac: Provided, However, That The Request For Reconsideration Shall Not Be Granted If It Is Established That The Finding Of Failure Is Due To The Fault Of The Bidder Concerned: Provided, Further, That The Bac Shall Decide On The Request For Reconsideration Within Seven (7) Calendar Days From Receipt Thereof. If A Failed Bidder Signifies His Intent To File A Request For Reconsideration, The Bac Shall Keep The Bid Envelopes Of The Said Failed Bidder Unopened And/or Duly Sealed Until Such Time That The Request For Reconsideration Or Protest Has Been Resolved. E. Evaluation And Comparison Of Bids 25. Process To Be Confidential 25.1. Members Of The Bac, Including Its Staff And Personnel, As Well As Its Secretariat And Twg, Are Prohibited From Making Or Accepting Any Kind Of Communication With Any Bidder Regarding The Evaluation Of Their Bids Until The Issuance Of The Notice Of Award, Unless N The Case Of Itb Clause 26. 25.2. Any Effort By A Bidder To Influence The Procuring Entity In The Procuring Entity’s Decision In Respect Of Bid Evaluation, Bid Comparison Or Contract Award Will Result In The Rejection Of The Bidder’s Bid. 26. Clarification Of Bids To Assist In The Evaluation, Comparison And Post-qualification Of The Bids, The Procuring Entity May Ask In Writing Any Bidder For A Clarification Of Its Bid. All Responses To Requests For Clarification Shall Be In Writing. Any Clarification Submitted By A Bidder In Respect To Its Bid And That Is Not In Response To A Request By The Procuring Entity Shall Not Be Considered 27. Detailed Evaluation And Comparison Of Bids 27.1. The Procuring Entity Will Undertake The Detailed Evaluation And Comparison Of Bids Which Have Passed The Opening And Preliminary Examination Of Bids, Pursuant To Itb Clause 24, In Order To Determine The Lowest Calculated Bid. 27.2. In Evaluating The Bids To Get The Lowest Calculated Bid, The Procuring Entity Shall Undertake The Following: (a) The Detailed Evaluation Of The Financial Component Of The Bids, To Establish The Correct Calculated Prices Of The Bids; And (b) The Ranking Of The Total Bid Prices As So Calculated From The Lowest To Highest. The Bid With The Lowest Price Shall Be Identified As The Lowest Calculated Bid. 27.3. The Procuring Entity's Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary “pass/fail” Criterion. The Bac Shall Consider The Following In The Evaluation Of Bids: (a) Completeness Of The Bid. Unless The Itb Specifically Allows Partial Bids, Bids Not Addressing Or Providing All Of The Required Items In The Schedule Of Requirements Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A "0" (zero) For The Said Item Would Mean That It Is Being Offered For Free To The Procuring Entity; And (b) Arithmetical Corrections. Consider Computational Errors And Omissions To Enable Proper Comparison Of All Eligible Bids. It May Also Consider Bid Modifications If Expressly Allowed In The Bds. Any Adjustment Shall Be Calculated In Monetary Terms To Determine The Calculated Prices. 27.4. Based On The Detailed Evaluation Of Bids, Those That Comply With The Above-mentioned Requirements Shall Be Ranked In The Ascending Order Of Their Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, To Identify The Lowest Calculated Bid. Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, Which Exceed The Abc Shall Not Be Considered, Unless Otherwise Indicated In The Bds. 27.5. The Procuring Entity’s Evaluation Of Bids Shall Only Be Based On The Bid Price Quoted In The Financial Bid Form 27.6. Bids Shall Be Evaluated On An Equal Footing To Ensure Fair Competition. For This Purpose, All Bidders Shall Be Required To Include In Their Bids The Cost Of All Taxes, Such As, But Not Limited To, Value Added Tax (vat), Income Tax, Local Taxes, And Other Fiscal Levies And Duties Which Shall Be Itemized In The Bid Form And Reflected In The Detailed Estimates. Such Bids, Including Said Taxes, Shall Be The Basis For Bid Evaluation And Comparison. 28. Post Qualification 28.1. The Procuring Entity Shall Determine To Its Satisfaction Whether The Bidder That Is Evaluated As Having Submitted The Lowest Calculated Bid (lcb) Complies With And Is Responsive To All The Requirements And Conditions Specified In Itb Clauses 5, 12, And 13. 28.2. Within A Non-extendible Period Of Three (3) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lcb, The Bidder Shall Submit The Following Documentary Requirements: (a) Tax Clearance Per Executive Order 398, Series Of 2005; (b) Latest Income And Business Tax Returns In The Form Specified In The Bds; (c) Certificate Of Philgeps Registration; And (d) Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. Failure Of The Bidder Declared As Lcb To Duly Submit The Requirements Under This Clause Or A Finding Against The Veracity Of Such, Shall Be Ground For Forfeiture Of The Bid Security And Disqualification Of The Bidder For Award. 28.3. The Determination Shall Be Based Upon An Examination Of The Documentary Evidence Of The Bidder’s Qualifications Submitted Pursuant To Itb Clauses 12 And 13, As Well As Other Information As The Procuring Entity Deems Necessary And Appropriate, Using A Non-discretionary “pass/fail” Criterion. 28.4. If The Bac Determines That The Bidder With The Lowest Calculated Bid Passes All The Criteria For Post-qualification, It Shall Declare The Said Bid As The Lowest Calculated Responsive Bid, And Recommend To The Head Of The Procuring Entity The Award Of Contract To The Said Bidder At Its Submitted Price Or Its Calculated Bid Price, Whichever Is Lower, Subject To Itb Clause 30.3. 28.5. A Negative Determination Shall Result In Rejection Of The Bidder’s Bid, In Which Event The Procuring Entity Shall Proceed To The Next Lowest Calculated Bid To Make A Similar Determination Of That Bidder’s Capabilities To Perform Satisfactorily. If The Second Bidder, However, Fails The Post Qualification, The Procedure For Post Qualification Shall Be Repeated For The Bidder With The Next Lowest Calculated Bid, And So On Until The Lowest Calculated And Responsive Bid Is Determined For Contract Award. 28.6. Within A Period Not Exceeding Seven (7) Calendar Days From The Date Of Receipt Of The Recommendation Of The Bac, The Head Of The Procuring Entity Shall Approve Or Disapprove The Said Recommendation. In The Case Of Government Owned And Government-owned And/or -controlled Corporations (goccs) And Government Financial Institutions (gfis), The Period Provided Herein Shall Be Fifteen (15) Calendar Days. 29. Reservation Clause 29.1. Notwithstanding The Eligibility Or Post-qualification Of A Bidder, The Procuring Entity Concerned Reserves The Right To Review Its Qualifications At Any Stage Of The Procurement Process If It Has Reasonable Grounds To Believe That A Misrepresentation Has Been Made By The Said Bidder, Or That There Has Been A Change In The Bidder’s Capability To Undertake The Project From The Time It Submitted Its Eligibility Requirements. Should Such Review Uncover Any Misrepresentation Made In The Eligibility And Bidding Requirements, Statements Or Documents, Or Any Changes In The Situation Of The Bidder Which Will Affect Its Capability To Undertake The Project So That It Fails The Preset Eligibility Or Bid Evaluation Criteria, The Procuring Entity Shall Consider The Said Bidder As Ineligible And Shall Disqualify It From Submitting A Bid Or From Obtaining An Award Or Contract. 29.2. Based On The Following Grounds, The Procuring Entity Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding At Any Time Prior To The Contract Award, Or Not To Award The Contract, Without Thereby Incurring Any Liability, And Make No Assurance That A Contract Shall Be Entered Into As A Result Of The Bidding: (a) If There Is Prima Facie Evidence Of Collusion Between Appropriate Public Officers Or Employees Of The Procuring Entity, Or Between The Bac And Any Of The Bidders, Or If The Collusion Is Between Or Among The Bidders Themselves, Or Between A Bidder And A Third Party, Including Any Act Which Restricts, Suppresses Or Nullifies Or Tends To Restrict, Suppress Or Nullify Competition; (b) If The Procuring Entity’s Bac Is Found To Have Failed In Following The Prescribed Bidding Procedures; Or (c) For Any Justifiable And Reasonable Ground Where The Award Of The Contract Will Not Redound To The Benefit Of The Government As Follows: (i) If The Physical And Economic Conditions Have Significantly Changed So As To Render The Project No Longer Economically, Financially Or Technically Feasible As Determined By The Head Of The Procuring Entity; (ii) If The Project Is No Longer Necessary As Determined By The Head Of The Procuring Entity; And (iii) If The Source Of Funds For The Project Has Been Withheld Or Reduced Through No Fault Of The Procuring Entity. 29.3. In Addition, The Procuring Entity May Likewise Declare A Failure Of Bidding When: (a) No Bids Are Received; (b) All Prospective Bidders Are Declared Ineligible; (c) All Bids Fail To Comply With All The Bid Requirements Or Fail Post-qualification; Or (d) The Bidder With The Lowest Calculated Responsive Bid Refuses, Without Justifiable Cause To Accept The Award Of Contract, And No Award Is Made. F. Award Of Contract 30. Contract Award 30.1. Subject To Itb Clause 28, The Procuring Entity Shall Award The Contract To The Bidder Whose Bid Has Been Determined To Be The Lowest Calculated And Responsive Bid (lcrb). 30.2. Prior To The Expiration Of The Period Of Bid Validity, The Procuring Entity Shall Notify The Successful Bidder In Writing That Its Bid Has Been Accepted, Through A Notice Of Award Received Personally Or Sent By Registered Mail Or Electronically, Receipt Of Which Must Be Confirmed In Writing Within Two (2) Days By The Lcrb And Submitted Personally Or Sent By Registered Mail Or Electronically To The Procuring Entity. 30.3. Notwithstanding The Issuance Of The Notice Of Award, Award Of Contract Shall Be Subject To The Following Conditions: (a) Submission Of The Following Documents Within The Prescribed Period From Receipt By The Bidder Of The Notice That It Has The Lowest Calculated And Responsive Bid: (i) Valid Jva, If Applicable, Within Ten (10) Calendar Days; (ii) Valid Pcab License And Registration For The Type And Cost Of The Contract To Be Bid For Foreign Bidders, Within Thirty (30) Calendar Days, If Allowed Under A Treaty Or International Or Executive Agreement Mentioned In Itb Clause 12.1(a)(iv); (b) Posting Of The Performance Security In Accordance With Itb Clause 32; (c) Signing Of The Contract As Provided In Itb Clause 31; And (d) Approval By Higher Authority, If Required. 31. Signing Of The Contract 31.1. At The Same Time As The Procuring Entity Notifies The Successful Bidder That Its Bid Has Been Accepted, The Procuring Entity Shall Send The Contract Form To The Bidder, Which Contract Has Been Provided In The Bidding Documents, Incorporating Therein All Agreements Between The Parties. 31.2. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award, The Successful Bidder Shall Post The Required Performance Security, Sign And Date The Contract And Return It To The Procuring Entity. 31.3. The Procuring Entity Shall Enter Into Contract With The Successful Bidder Within The Same Ten (10) Calendar Day Period Provided That All The Documentary Requirements Are Complied With. 31.4. The Following Documents Shall Form Part Of The Contract: (a) Contract Agreement; (b) Bidding Documents; (c) Winning Bidder’s Bid, Including The Technical And Financial Proposals, And All Other Documents/statements Submitted; (d) Performance Security; (e) Credit Line In Accordance With Itb Clause 5.5, If Applicable; (f) Notice Of Award Of Contract; And (g) Other Contract Documents That May Be Required By Existing Laws And/or Specified In The Bds. 32. Performance Security 32.1. To Guarantee The Faithful Performance By The Winning Bidder Of Its Obligations Under The Contract, It Shall Post A Performance Security Within A Maximum Period Of Ten (10) Calendar Days From The Receipt Of The Notice Of Award From The Procuring Entity And In No Case Later Than The Signing Of The Contract. 32.2. The Performance Security Shall Be Denominated In Philippine Pesos And Posted In Favor Of The Procuring Entity In An Amount Equal To The Percentage Of The Total Contract Price As Stated In The Bds In Accordance With The Following Schedule: 33. 33.1. Form Of Performance Security Amount Of Performance Security (equal To Percentage Of The Total Contract Price) (a) Cash Or Cashier’s/manager’s Check Issued By A Universal Or Commercial Bank. Ten Percent (10%) (b) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank. (c) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security; And/or Thirty Percent (30%) (d) Any Combination Of The Foregoing. Proportionate To Share Of Form With Respect To Total Amount Of Security 33.2. Failure Of The Successful Bidder To Comply With The Above-mentioned Requirement Shall Constitute Sufficient Ground For The Annulment Of The Award And Forfeiture Of The Bid Security, In Which Event The Procuring Entity Shall Initiate And Complete The Post Qualification Of The Second Lowest Calculated Bid. The Procedure Shall Be Repeated Until The Lowest Calculated And Responsive Bid Is Identified And Selected For Contract Award. However If No Bidder Passed Post-qualification, The Bac Shall Declare The Bidding A Failure And Conduct A Re-bidding With Re-advertisement. 34. Notice To Proceed 34.1. Within Three (3) Calendar Days From The Date Of Approval Of The Contract By The Appropriate Government Approving Authority, The Procuring Entity Shall Issue Its Notice To Proceed To The Bidder. 34.2. The Contract Effectivity Date Shall Be Provided In The Notice To Proceed By The Procuring Entity, Which Date Shall Not Be Later Than Seven (7) Calendar Days From The Issuance Of The Notice To Proceed. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 1.1 The Procuring Entity Is Lgu- Mapanas, Northern Samar. The Name Of The Contract Is Repair/rehabilitation Of Mapanas Rhu, Brgy. Del Norte, Mapanas N. Samar The Identification Number Of The Contract Is Pr No-2024-11-094___ 2 The Funding Source Is: Trust Fund (edf) For Fy 2023. The Name Of The Project Is: Repair/rehabilitation Of Mapanas Rhu, Brgy. Del Norte, Mapanas N. Samar. 3.1 No Further Instructions. 5.1 No Further Instructions. 5.2 Bidding Is Restricted To Eligible Bidders As Defined In Itb Clause 5.1. 5.4 For This Purpose, Similar Contracts Shall Refer To Bidder’s Annual Turnover From All Works Average Over The Last Three Years Shall Be Equal To 50% Of The Estimated Cost Of The Contract Being Procured. The Bidder Must Have Completed, Within The Past Ten (10) Years From The Submission Of Bids, A Single Contract That Is Similar To This Project, Equivalent To At Least Eighty Percent (80%) Of The Abc. 8.1 “subcontracting Is Not Allowed.” 8.2 “not Applicable”. 9.1 The Procuring Entity Will Hold A Pre-bid Conference For This Project On November 15, 2024 At 10:00 A.m. At Executive Conference 2nd Floor Of New Municipal Bldg. Mapanas, Northern Samar. 10.1 The Procuring Entity’s Address Is: The Municipality Of Mapanas, Province Of Northern Samar Ma. Teresa L. Minguez Lgu-bac Chairperson Tel. No. 09778033758 10.3 No Further Instructions. 12.1 Not Applicable 12.1(a)(i) “no Other Acceptable Proof Of Registration Is Recognized.” 12.1(a)(iv) No Further Instructions. 13.1 “no Additional Requirements” 13.1(b) The Abc Is Php1,049,465.57 Any Bid With A Financial Component Exceeding This Amount Shall Not Be Accepted. 14.2 “no Further Instructions.” 15.4 No Further Instruction. 16.1 The Bid Prices Shall Be Quoted In Philippine Pesos. 17.1 Bids Will Be Valid Until 120 Calendar Days After The Bid Submission Deadline Date As Prescribed By The Procuring Entity) 18.1 The Bid Security Shall Be In The Following Amount: 1. The Amount Of 20,989.31 If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; 2. The Amount Of P52,473.28 If Bid Security Is In Surety Bond; Or 3. Any Combination Of The Foregoing Proportionate To The Share Of Form With Respect To Total Amount Of Security. 18.2 The Bid Security Shall Be Valid Twenty Eight Days Beyond The Validity Period Of The Bid. 20.3 Each Bidder Shall Submit One Original And One Copy Of The First And Second Components Of Its Bid. 21 The Address For Submission Of Bids Is Ma. Teresa L. Minguez Lgu-bac Chairperson Bac Office @ Mpdo, 1st Floor, New Municipal Bldg. Municipality Of Mapanas, Northern Samar The Deadline For Submission Of Bids Is 9:00 A.m. On November 26, 2024. 22 The Place Of Bid Opening Is Executive Conference Room, 2nd Floor, New Municipal Bldg. Municipality Of Mapanas, Northern Samar. The Date And Time Of Bid Opening Is November 26, 2024 At Exactly 10:00 A.m. 24.2 No Further Instructions. 27.3(b) Bid Modification Is Not Allowed. 27.4 No Further Instructions. 28.2(b) Bidders Have Option To Submit Manually Filed Tax Returns Or Tax Returns Filed Through The Electronic Filing And Payments System (efps). Note: The Latest Income And Business Tax Returns Are Those Within The Last Six Months Preceding The Date Of Bid Submission. 28.2(d) List Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It. 1. Taxpayer’s Identification Number 2. Vat Registration 3. Philippine Contractors Accreditation Board (pcab) License The Requirements Are Applicable Only In A Case Where The Lowest Calculated Bid (lcb) Is Submitted By A Domestic Bidder, And If The Lowest Calculated Bid (lcb) Is Submitted By A Foreign Bidder, This Requirements Are Not Applicable 31.4(g) List Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Department Of Labor And Employment, And Pert/cpm. 32.2 The Performance Security Shall Be In The Following Amount: 1. The Amount Of 10% Of Contract If Performance Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; 2. The Amount Of 30% Of Contract If Performance Security Is In Surety Bond; Or 3. Any Combination Of The Foregoing Proportionate To The Share Of Form With Respect To Total Amount Of Security. Section Iv. General Conditions Of Contract Table Of Contents 1. Definitions 41 2. Interpretation 43 3. Governing Language And Law 43 4. Communications 43 5. Possession Of Site 43 6. The Contractor’s Obligations 44 7. Performance Security 45 8. Subcontracting 46 9. Liquidated Damages 46 10. Site Investigation Reports 47 11. The Procuring Entity, Licenses And Permits 47 12. Contractor’s Risk And Warranty Security 47 13. Liability Of The Contractor 49 14. Procuring Entity’s Risk 49 15. Insurance 49 16. Termination For Default Of Contractor 51 17. Termination For Default Of Procuring Entity 51 18. Termination For Other Causes 52 19. Procedures For Termination Of Contracts 53 20. Force Majeure, Release From Performance 56 21. Resolution Of Disputes 56 22. Suspension Of Loan, Credit, Grant, Or Appropriation 57 23. Procuring Entity’s Representative’s Decisions 57 24. Approval Of Drawings And Temporary Works By The Procuring Entity’s Representative 57 25. Acceleration And Delays Ordered By The Procuring Entity’s Representative 58 26. Extension Of The Intended Completion Date 58 27. Right To Vary 58 28. Contractors Right To Claim 59 29. Dayworks 59 30. Early Warning 59 31. Program Of Work 59 32. Management Conferences 60 33. Bill Of Quantities 60 34. Instructions, Inspections And Audits 61 35. Identifying Defects 61 36. Cost Of Repairs 61 37. Correction Of Defects 61 38. Uncorrected Defects 62 39. Advance Payment 62 40. Progress Payments 62 41. Payment Certificates 63 42. Retention 63 43. Variation Orders 64 44. Contract Completion 66 45. Suspension Of Work 66 46. Payment On Termination 67 47. Extension Of Contract Time 67 48. Price Adjustment 68 49. Completion 68 50. Taking Over 69 51. Operating And Maintenance Manuals 69 1. Definitions For Purposes Of This Clause, Boldface Type Is Used To Identify Defined Terms. 1.1. The Arbiter Is The Person Appointed Jointly By The Procuring Entity And The Contractor To Resolve Disputes In The First Instance, As Provided For In Gcc Clause 21. 1.2. Bill Of Quantities Refers To A List Of The Specific Items Of The Work And Their Corresponding Unit Prices, Lump Sums, And/or Provisional Sums. 1.3. The Completion Date Is The Date Of Completion Of The Works As Certified By The Procuring Entity’s Representative, In Accordance With Gcc Clause 49. 1.4. The Contract Is The Contract Between The Procuring Entity And The Contractor To Execute, Complete, And Maintain The Works. 1.5. The Contract Price Is The Price Stated In The Letter Of Acceptance And Thereafter To Be Paid By The Procuring Entity To The Contractor For The Execution Of The Works In Accordance With This Contract. 1.6. Contract Time Extension Is The Allowable Period For The Contractor To Complete The Works In Addition To The Original Completion Date Stated In This Contract. 1.7. The Contractor Is The Juridical Entity Whose Proposal Has Been Accepted By The Procuring Entity And To Whom The Contract To Execute The Work Was Awarded. 1.8. The Contractor’s Bid Is The Signed Offer Or Proposal Submitted By The Contractor To The Procuring Entity In Response To The Bidding Documents. 1.9. Days Are Calendar Days; Months Are Calendar Months. 1.10. Dayworks Are Varied Work Inputs Subject To Payment On A Time Basis For The Contractor’s Employees And Equipment, In Addition To Payments For Associated Materials And Plant. 1.11. A Defect Is Any Part Of The Works Not Completed In Accordance With The Contract. 1.12. The Defects Liability Certificate Is The Certificate Issued By Procuring Entity’s Representative Upon Correction Of Defects By The Contractor. 1.13. The Defects Liability Period Is The One Year Period Between Contract Completion And Final Acceptance Within Which The Contractor Assumes The Responsibility To Undertake The Repair Of Any Damage To The Works At His Own Expense. 1.14. Drawings Are Graphical Presentations Of The Works. They Include All Supplementary Details, Shop Drawings, Calculations, And Other Information Provided Or Approved For The Execution Of This Contract. 1.15. Equipment Refers To All Facilities, Supplies, Appliances, Materials Or Things Required For The Execution And Completion Of The Work Provided By The Contractor And Which Shall Not Form Or Are Not Intended To Form Part Of The Permanent Works. 1.16. The Intended Completion Date Refers To The Date Specified In The Scc When The Contractor Is Expected To Have Completed The Works. The Intended Completion Date May Be Revised Only By The Procuring Entity’s Representative By Issuing An Extension Of Time Or An Acceleration Order. 1.17. Materials Are All Supplies, Including Consumables, Used By The Contractor For Incorporation In The Works. 1.18. The Notice To Proceed Is A Written Notice Issued By The Procuring Entity Or The Procuring Entity’s Representative To The Contractor Requiring The Latter To Begin The Commencement Of The Work Not Later Than A Specified Or Determinable Date. 1.19. Permanent Works All Permanent Structures And All Other Project Features And Facilities Required To Be Constructed And Completed In Accordance With This Contract Which Shall Be Delivered To The Procuring Entity And Which Shall Remain At The Site After The Removal Of All Temporary Works. 1.20. Plant Refers To The Machinery, Apparatus, And The Like Intended To Form An Integral Part Of The Permanent Works. 1.21. The Procuring Entity Is The Party Who Employs The Contractor To Carry Out The Works Stated In The Scc. 1.22. The Procuring Entity’s Representative Refers To The Head Of The Procuring Entity Or His Duly Authorized Representative, Identified In The Scc, Who Shall Be Responsible For Supervising The Execution Of The Works And Administering This Contract. 1.23. The Site Is The Place Provided By The Procuring Entity Where The Works Shall Be Executed And Any Other Place Or Places Which May Be Designated In The Scc, Or Notified To The Contractor By The Procuring Entity’s Representative As Forming Part Of The Site. 1.24. Site Investigation Reports Are Those That Were Included In The Bidding Documents And Are Factual And Interpretative Reports About The Surface And Subsurface Conditions At The Site. 1.25. Slippage Is A Delay In Work Execution Occurring When Actual Accomplishment Falls Below The Target As Measured By The Difference Between The Scheduled And Actual Accomplishment Of The Work By The Contractor As Established From The Work Schedule. This Is Actually Described As A Percentage Of The Whole Works. 1.26. Specifications Means The Description Of Works To Be Done And The Qualities Of Materials To Be Used, The Equipment To Be Installed And The Mode Of Construction. 1.27. The Start Date, As Specified In The Scc, Is The Date When The Contractor Is Obliged To Commence Execution Of The Works. It Does Not Necessarily Coincide With Any Of The Site Possession Dates. 1.28. A Subcontractor Is Any Person Or Organization To Whom A Part Of The Works Has Been Subcontracted By The Contractor, As Allowed By The Procuring Entity, But Not Any Assignee Of Such Person. 1.29. Temporary Works Are Works Designed, Constructed, Installed, And Removed By The Contractor That Are Needed For Construction Or Installation Of The Permanent Works. 1.30. Work(s)refer To The Permanent Works And Temporary Works To Be Executed By The Contractor In Accordance With This Contract, Including (i) The Furnishing Of All Labor, Materials, Equipment And Others Incidental, Necessary Or Convenient To The Complete Execution Of The Works; (ii) The Passing Of Any Tests Before Acceptance By The Procuring Entity’s Representative; (iii) And The Carrying Out Of All Duties And Obligations Of The Contractor Imposed By This Contract As Described In The Scc. 2. Interpretation 2.1. In Interpreting The Conditions Of Contract, Singular Also Means Plural, Male Also Means Female Or Neuter, And The Other Way Around. Headings Have No Significance. Words Have Their Normal Meaning Under The Language Of This Contract Unless Specifically Defined. The Procuring Entity’s Representative Will Provide Instructions Clarifying Queries About The Conditions Of Contract. 2.2. If Sectional Completion Is Specified In The Scc, References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Governing Language And Law 3.1. This Contract Has Been Executed In The English Language, Which Shall Be The Binding And Controlling Language For All Matters Relating To The Meaning Or Interpretation Of This Contract. All Correspondence And Other Documents Pertaining To This Contract Which Are Exchanged By The Parties Shall Be Written In English. 3.2. This Contract Shall Be Interpreted In Accordance With The Laws Of The Republic Of The Philippines. 4. Communications Communications Between Parties That Are Referred To In The Conditions Shall Be Effective Only When In Writing. A Notice Shall Be Effective Only When It Is Received By The Concerned Party. 5. Possession Of Site 5.1. On The Date Specified In The Scc, The Procuring Entity Shall Grant The Contractor Possession Of So Much Of The Site As May Be Required To Enable It To Proceed With The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 5.2. If Possession Of A Portion Is Not Given By The Date Stated In The Scc Clause 5.1, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contact Time To Address Such Delay Shall Be In Accordance With Gcc Clause 47. 5.3. The Contractor Shall Bear All Costs And Charges For Special Or Temporary Right-of-way Required By It In Connection With Access To The Site. The Contractor Shall Also Provide At His Own Cost Any Additional Facilities Outside The Site Required By It For Purposes Of The Works. 5.4. The Contractor Shall Allow The Procuring Entity’s Representative And Any Person Authorized By The Procuring Entity’s Representative Access To The Site And To Any Place Where Work In Connection With This Contract Is Being Carried Out Or Is Intended To Be Carried Out. 6. The Contractor’s Obligations 6.1. The Contractor Shall Carry Out The Works Properly And In Accordance With This Contract. The Contractor Shall Provide All Supervision, Labor, Materials, Plant And Contractor's Equipment, Which May Be Required. All Materials And Plant On Site Shall Be Deemed To Be The Property Of The Procuring Entity. 6.2. The Contractor Shall Commence Execution Of The Works On The Start Date And Shall Carry Out The Works In Accordance With The Program Of Work Submitted By The Contractor, As Updated With The Approval Of The Procuring Entity’s Representative, And Complete Them By The Intended Completion Date. 6.3. The Contractor Shall Be Responsible For The Safety Of All Activities On The Site. 6.4. The Contractor Shall Carry Out All Instructions Of The Procuring Entity’s Representative That Comply With The Applicable Laws Where The Site Is Located. 6.5. The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel, As Referred To In The Scc, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 6.6. If The Procuring Entity’s Representative Asks The Contractor To Remove A Member Of The Contractor’s Staff Or Work Force, For Justifiable Cause, The Contractor Shall Ensure That The Person Leaves The Site Within Seven (7) Days And Has No Further Connection With The Work In This Contract. 6.7. During Contract Implementation, The Contractor And His Subcontractors Shall Abide At All Times By All Labor Laws, Including Child Labor Related Enactments, And Other Relevant Rules. 6.8. The Contractor Shall Submit To The Procuring Entity For Consent The Name And Particulars Of The Person Authorized To Receive Instructions On Behalf Of The Contractor. 6.9. The Contractor Shall Cooperate And Share The Site With Other Contractors, Public Authorities, Utilities, And The Procuring Entity Between The Dates Given In The Schedule Of Other Contractors Particularly When They Shall Require Access To The Site. The Contractor Shall Also Provide Facilities And Services For Them During This Period. The Procuring Entity May Modify The Schedule Of Other Contractors, And Shall Notify The Contractor Of Any Such Modification Thereto. 6.10. Should Anything Of Historical Or Other Interest Or Of Significant Value Be Unexpectedly Discovered On The Site, It Shall Be The Property Of The Procuring Entity. The Contractor Shall Notify The Procuring Entity’s Representative Of Such Discoveries And Carry Out The Procuring Entity’s Representative’s Instructions In Dealing With Them. 7. Performance Security 7.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Contractor Shall Furnish The Performance Security In Any The Forms Prescribed In Itb Clause 32.2. 7.2. The Performance Security Posted In Favor Of The Procuring Entity Shall Be Forfeited In The Event It Is Established That The Contractor Is In Default In Any Of Its Obligations Under The Contract. 7.3. The Performance Security Shall Remain Valid Until Issuance By The Procuring Entity Of The Certificate Of Final Acceptance. 7.4. The Performance Security May Be Released By The Procuring Entity And Returned To The Contractor After The Issuance Of The Certificate Of Final Acceptance Subject To The Following Conditions: (a) There Are No Pending Claims Against The Contractor Or The Surety Company Filed By The Procuring Entity; (b) The Contractor Has No Pending Claims For Labor And Materials Filed Against It; And (c) Other Terms Specified In The Scc. 7.5. The Contractor Shall Post An Additional Performance Security Following The Amount And Form Specified In Itb Clause 32.2 To Cover Any Cumulative Increase Of More Than Ten Percent (10%) Over The Original Value Of The Contract As A Result Of Amendments To Order Or Change Orders, Extra Work Orders And Supplemental Agreements, As The Case May Be. The Contractor Shall Cause The Extension Of The Validity Of The Performance Security To Cover Approved Contract Time Extensions. 7.6. In Case Of A Reduction In The Contract Value Or For Partially Completed Works Under The Contract Which Are Usable And Accepted By The Procuring Entity The Use Of Which, In The Judgment Of The Implementing Agency Or The Procuring Entity, Will Not Affect The Structural Integrity Of The Entire Project, The Procuring Entity Shall Allow A Proportional Reduction In The Original Performance Security, Provided That Any Such Reduction Is More Than Ten Percent (10%) And That The Aggregate Of Such Reductions Is Not More Than Fifty Percent (50%) Of The Original Performance Security. 7.7. Unless Otherwise Indicated In The Scc, The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Act 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 8. Subcontracting 8.1. Unless Otherwise Indicated In The Scc, The Contractor Cannot Subcontract Works More Than The Percentage Specified In Itb Clause 8.1. 8.2. Subcontracting Of Any Portion Of The Works Does Not Relieve The Contractor Of Any Liability Or Obligation Under This Contract. The Contractor Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants Or Workmen. 8.3. Subcontractors Disclosed And Identified During The Bidding May Be Changed During The Implementation Of This Contract, Subject To Compliance With The Required Qualifications And The Approval Of The Procuring Entity. 9. Liquidated Damages 9.1. The Contractor Shall Pay Liquidated Damages To The Procuring Entity For Each Day That The Completion Date Is Later Than The Intended Completion Date. The Applicable Liquidated Damages Is At Least One-tenth (1/10) Of A Percent Of The Cost Of The Unperformed Portion For Every Day Of Delay. The Total Amount Of Liquidated Damages Shall Not Exceed Ten Percent (10%) Of The Amount Of The Contract. The Procuring Entity May Deduct Liquidated Damages From Payments Due To The Contractor. Payment Of Liquidated Damages Shall Not Affect The Contractor. Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of This Contract, The Procuring Entity Shall Rescind This Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. 9.2. If The Intended Completion Date Is Extended After Liquidated Damages Have Been Paid, The Engineer Of The Procuring Entity Shall Correct Any Overpayment Of Liquidated Damages By The Contractor By Adjusting The Next Payment Certificate. The Contractor Shall Be Paid Interest On The Overpayment, Calculated From The Date Of Payment To The Date Of Repayment, At The Rates Specified In Gcc Clause 40.3. 10. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 11. The Procuring Entity, Licenses And Permits The Procuring Entity Shall, If Requested By The Contractor, Assist Him In Applying For Permits, Licenses Or Approvals, Which Are Required For The Works. 12. Contractor’s Risk And Warranty Security 12.1. The Contractor Shall Assume Full Responsibility For The Works From The Time Project Construction Commenced Up To Final Acceptance By The Procuring Entity And Shall Be Held Responsible For Any Damage Or Destruction Of The Works Except Those Occasioned By Force Majeure. The Contractor Shall Be Fully Responsible For The Safety, Protection, Security, And Convenience Of His Personnel, Third Parties, And The Public At Large, As Well As The Works, Equipment, Installation, And The Like To Be Affected By His Construction Work. 12.2. The Defects Liability Period For Infrastructure Projects Shall Be One Year From Contract Completion Up To Final Acceptance By The Procuring Entity. During This Period, The Contractor Shall Undertake The Repair Works, At His Own Expense, Of Any Damage To The Works On Account Of The Use Of Materials Of Inferior Quality Within Ninety (90) Days From The Time The Head Of The Procuring Entity Has Issued An Order To Undertake Repair. In Case Of Failure Or Refusal To Comply With This Mandate, The Procuring Entity Shall Undertake Such Repair Works And Shall Be Entitled To Full Reimbursement Of Expenses Incurred Therein Upon Demand. 12.3. Unless Otherwise Indicated In The Scc, In Case The Contractor Fails To Comply With The Preceding Paragraph, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property (ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 12.4. After Final Acceptance Of The Works By The Procuring Entity, The Contractor Shall Be Held Responsible For “structural Defects”, I.e., Major Faults/flaws/deficiencies In One Or More Key Structural Elements Of The Project Which May Lead To Structural Failure Of The Completed Elements Or Structure, Or “structural Failures”, I.e., Where One Or More Key Structural Elements In An Infrastructure Facility Fails Or Collapses, Thereby Rendering The Facility Or Part Thereof Incapable Of Withstanding The Design Loads, And/or Endangering The Safety Of The Users Or The General Public: (a) Contractor – Where Structural Defects/failures Arise Due To Faults Attributable To Improper Construction, Use Of Inferior Quality/substandard Materials, And Any Violation Of The Contract Plans And Specifications, The Contractor Shall Be Held Liable; (b) Consultants – Where Structural Defects/failures Arise Due To Faulty And/or Inadequate Design And Specifications As Well As Construction Supervision, Then The Consultant Who Prepared The Design Or Undertook Construction Supervision For The Project Shall Be Held Liable; (c) Procuring Entity’s Representatives/project Manager/construction Managers And Supervisors – The Project Owner’s Representative(s), Project Manager, Construction Manager, And Supervisor(s) Shall Be Held Liable In Cases Where The Structural Defects/failures Are Due To His/their Willful Intervention In Altering The Designs And Other Specifications; Negligence Or Omission In Not Approving Or Acting On Proposed Changes To Noted Defects Or Deficiencies In The Design And/or Specifications; And The Use Of Substandard Construction Materials In The Project; (d) Third Parties - Third Parties Shall Be Held Liable In Cases Where Structural Defects/failures Are Caused By Work Undertaken By Them Such As Leaking Pipes, Diggings Or Excavations, Underground Cables And Electrical Wires, Underground Tunnel, Mining Shaft And The Like, In Which Case The Applicable Warranty To Such Structure Should Be Levied To Third Parties For Their Construction Or Restoration Works. (e) Users - In Cases Where Structural Defects/failures Are Due To Abuse/misuse By The End User Of The Constructed Facility And/or Non–compliance By A User With The Technical Design Limits And/or Intended Purpose Of The Same, Then The User Concerned Shall Be Held Liable. 12.5. The Warranty Against Structural Defects/failures, Except Those Occasioned On Force Majeure, Shall Cover The Period Specified In The Scc Reckoned From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. 12.6. The Contractor Shall Be Required To Put Up A Warranty Security In The Form Of Cash, Bank Guarantee, Letter Of Credit, Gsis Or Surety Bond Callable On Demand, In Accordance With The Following Schedule: Form Of Warranty Minimum Amount In Percentage (%) Of Total Contract Price (a) Cash Or Letter Of Credit Issued By Universal Or Commercial Bank: Provided, However, That The Letter Of Credit Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank Five Percent (5%) (b) Bank Guarantee Confirmed By Universal Or Commercial Bank: Provided, However, That The Letter Of Credit Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank Ten Percent (10%) (c) Surety Bond Callable Upon Demand Issued By Gsis Or Any Surety Or Insurance Company Duly Certified By The Insurance Commission Thirty Percent (30%) 12.7. The Warranty Security Shall Be Stated In Philippine Pesos And Shall Remain Effective For One Year From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity, And Returned Only After The Lapse Of Said One Year Period. 12.8. In Case Of Structural Defects/failure Occurring During The Applicable Warranty Period Provided In Gcc Clause 12.5, The Procuring Entity Shall Undertake The Necessary Restoration Or Reconstruction Works And Shall Be Entitled To Full Reimbursement By The Parties Found To Be Liable For Expenses Incurred Therein Upon Demand, Without Prejudice To The Filing Of Appropriate Administrative, Civil, And/or Criminal Charges Against The Responsible Persons As Well As The Forfeiture Of The Warranty Security Posted In Favor Of The Procuring Entity. 13. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. 14. Procuring Entity’s Risk 14.1. From The Start Date Until The Certificate Of Final Acceptance Has Been Issued, The Following Are Risks Of The Procuring Entity: (a) The Risk Of Personal Injury, Death, Or Loss Of Or Damage To Property (excluding The Works, Plant, Materials, And Equipment), Which Are Due To: (i) Any Type Of Use Or Occupation Of The Site Authorized By The Procuring Entity After The Official Acceptance Of The Works; Or (ii) Negligence, Breach Of Statutory Duty, Or Interference With Any Legal Right By The Procuring Entity Or By Any Person Employed By Or Contracted To Him Except The Contractor. (b) The Risk Of Damage To The Works, Plant, Materials, And Equipment To The Extent That It Is Due To A Fault Of The Procuring Entity Or In The Procuring Entity’s Design, Or Due To War Or Radioactive Contamination Directly Affecting The Country Where The Works Are To Be Executed. 15. Insurance 15.1. The Contractor Shall, Under His Name And At His Own Expense, Obtain And Maintain, For The Duration Of This Contract, The Following Insurance Coverage: (a) Contractor’s All Risk Insurance; (b) Transportation To The Project Site Of Equipment, Machinery, And Supplies Owned By The Contractor; (c) Personal Injury Or Death Of Contractor’s Employees; And (d) Comprehensive Insurance For Third Party Liability To Contractor’s Direct Or Indirect Act Or Omission Causing Damage To Third Persons. 15.2. The Contractor Shall Provide Evidence To The Procuring Entity’s Representative That The Insurances Required Under This Contract Have Been Effected And Shall, Within A Reasonable Time, Provide Copies Of The Insurance Policies To The Procuring Entity’s Representative. Such Evidence And Such Policies Shall Be Provided To The Procuring Entity’s Through The Procuring Entity’s Representative. 15.3. The Contractor Shall Notify The Insurers Of Changes In The Nature, Extent, Or Program For The Execution Of The Works And Ensure The Adequacy Of The Insurances At All Times In Accordance With The Terms Of This Contract And Shall Produce To The Procuring Entity’s Representative The Insurance Policies In Force Including The Receipts For Payment Of The Current Premiums. The Above Insurance Policies Shall Be Obtained From Any Reputable Insurance Company Approved By The Procuring Entity’s Representative. 15.4. If The Contractor Fails To Obtain And Keep In Force The Insurances Referred To Herein Or Any Other Insurance Which He May Be Required To Obtain Under The Terms Of This Contract, The Procuring Entity May Obtain And Keep In Force Any Such Insurances And Pay Such Premiums As May Be Necessary For The Purpose. From Time To Time, The Procuring Entity May Deduct The Amount It Shall Pay For Said Premiums Including Twenty Five Percent (25%) Therein From Any Monies Due, Or Which May Become Due, To The Contractor, Without Prejudice To The Procuring Entity Exercising Its Right To Impose Other Sanctions Against The Contractor Pursuant To The Provisions Of This Contract. 15.5. In The Event The Contractor Fails To Observe The Above Safeguards, The Procuring Entity May, At The Contractor’s Expense, Take Whatever Measure Is Deemed Necessary For Its Protection And That Of The Contractor’s Personnel And Third Parties, And/or Order The Interruption Of Dangerous Works. In Addition, The Procuring Entity May Refuse To Make The Payments Under Gcc Clause 40 Until The Contractor Complies With This Clause. 15.6. The Contractor Shall Immediately Replace The Insurance Policy Obtained As Required In This Contract, Without Need Of The Procuring Entity’s Demand, With A New Policy Issued By A New Insurance Company Acceptable To The Procuring Entity For Any Of The Following Grounds: (a) The Issuer Of The Insurance Policy To Be Replaced Has: (i) Become Bankrupt; (ii) Been Placed Under Receivership Or Under A Management Committee; (iii) Been Sued For Suspension Of Payment; Or (iv) Been Suspended By The Insurance Commission And Its License To Engage In Business Or Its Authority To Issue Insurance Policies Cancelled; Or (v) Where Reasonable Grounds Exist That The Insurer May Not Be Able, Fully And Promptly, To Fulfill Its Obligation Under The Insurance Policy. 16. Termination For Default Of Contractor 16.1. The Procuring Entity Shall Terminate This Contract For Default When Any Of The Following Conditions Attend Its Implementation: 16.2. Due To The Contractor’s Fault And While The Project Is On-going, It Has Incurred Negative Slippage Of Fifteen Percent (15%) Or More In Accordance With Presidential Decree 1870, Regardless Of Whether Or Not Previous Warnings And Notices Have Been Issued For The Contractor To Improve His Performance; 16.3. Due To Its Own Fault And After This Contract Time Has Expired, The Contractor Incurs Delay In The Completion Of The Work After This Contract Has Expired; Or 16.4. The Contractor: (a) Abandons The Contract Works, Refuses Or Fails To Comply With A Valid Instruction Of The Procuring Entity Or Fails To Proceed Expeditiously And Without Delay Despite A Written Notice By The Procuring Entity; (b) Does Not Actually Have On The Project Site The Minimum Essential Equipment Listed On The Bid Necessary To Prosecute The Works In Accordance With The Approved Program Of Work And Equipment Deployment Schedule As Required For The Project; (c) Does Not Execute The Works In Accordance With This Contract Or Persistently Or Flagrantly Neglects To Carry Out Its Obligations Under This Contract; (d) Neglects Or Refuses To Remove Materials Or To Perform A New Work That Has Been Rejected As Defective Or Unsuitable; Or (e) Sub-lets Any Part Of This Contract Without Approval By The Procuring Entity. 16.5. All Materials On The Site, Plant, Equipment, And Works Shall Be Deemed To Be The Property Of The Procuring Entity If This Contract Is Rescinded Because Of The Contractor’s Default. 17. Termination For Default Of Procuring Entity The Contractor May Terminate This Contract With The Procuring Entity If The Works Are Completely Stopped For A Continuous Period Of At Least Sixty (60) Calendar Days Through No Fault Of Its Own, Due To Any Of The Following Reasons: (a) Failure Of The Procuring Entity To Deliver, Within A Reasonable Time, Supplies, Materials, Right-of-way, Or Other Items It Is Obligated To Furnish Under The Terms Of This Contract; Or (b) The Prosecution Of The Work Is Disrupted By The Adverse Peace And Order Situation, As Certified By The Armed Forces Of The Philippines Provincial Commander And Approved By The Secretary Of National Defense. 18. Termination For Other Causes 18.1. The Procuring Entity May Terminate This Contract, In Whole Or In Part, At Any Time For Its Convenience. The Head Of The Procuring Entity May Terminate This Contract For The Convenience Of The Procuring Entity If He Has Determined The Existence Of Conditions That Make Project Implementation Economically, Financially Or Technically Impractical And/or Unnecessary, Such As, But Not Limited To, Fortuitous Event(s) Or Changes In Law And National Government Policies. 18.2. The Procuring Entity Or The Contractor May Terminate This Contract If The Other Party Causes A Fundamental Breach Of This Contract. 18.3. Fundamental Breaches Of Contract Shall Include, But Shall Not Be Limited To, The Following: (a) The Contractor Stops Work For Twenty Eight (28) Days When No Stoppage Of Work Is Shown On The Current Program Of Work And The Stoppage Has Not Been Authorized By The Procuring Entity’s Representative; (b) The Procuring Entity’s Representative Instructs The Contractor To Delay The Progress Of The Works, And The Instruction Is Not Withdrawn Within Twenty Eight (28) Days; (c) The Procuring Entity Shall Terminate This Contract If The Contractor Is Declared Bankrupt Or Insolvent As Determined With Finality By A Court Of Competent Jurisdiction. In This Event, Termination Will Be Without Compensation To The Contractor, Provided That Such Termination Will Not Prejudice Or Affect Any Right Of Action Or Remedy Which Has Accrued Or Will Accrue Thereafter To The Procuring Entity And/or The Contractor. In The Case Of The Contractor's Insolvency, Any Contractor's Equipment Which The Procuring Entity Instructs In The Notice Is To Be Used Until The Completion Of The Works; (d) A Payment Certified By The Procuring Entity’s Representative Is Not Paid By The Procuring Entity To The Contractor Within Eighty Four (84) Days From The Date Of The Procuring Entity’s Representative’s Certificate; (e) The Procuring Entity’s Representative Gives Notice That Failure To Correct A Particular Defect Is A Fundamental Breach Of Contract And The Contractor Fails To Correct It Within A Reasonable Period Of Time Determined By The Procuring Entity’s Representative; (f) The Contractor Does Not Maintain A Security, Which Is Required; (g) The Contractor Has Delayed The Completion Of The Works By The Number Of Days For Which The Maximum Amount Of Liquidated Damages Can Be Paid, As Defined In The Gcc Clause 9; And (h) In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To, The Following: (i) Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Defined In Itb Clause 3.1(a), Unless Otherwise Specified In The Scc; (ii) Drawing Up Or Using Forged Documents; (iii) Using Adulterated Materials, Means Or Methods, Or Engaging In Production Contrary To Rules Of Science Or The Trade; And (iv) Any Other Act Analogous To The Foregoing. 18.4. The Funding Source Or The Procuring Entity, As Appropriate, Will Seek To Impose The Maximum Civil, Administrative And/or Criminal Penalties Available Under The Applicable Law On Individuals And Organizations Deemed To Be Involved With Corrupt, Fraudulent, Or Coercive Practices. 18.5. When Persons From Either Party To This Contract Gives Notice Of A Fundamental Breach To The Procuring Entity’s Representative In Order To Terminate The Existing Contract For A Cause Other Than Those Listed Under Gcc Clause 18.3, The Procuring Entity’s Representative Shall Decide Whether The Breach Is Fundamental Or Not. 18.6. If This Contract Is Terminated, The Contractor Shall Stop Work Immediately, Make The Site Safe And Secure, And Leave The Site As Soon As Reasonably Possible. 19. Procedures For Termination Of Contracts 19.1. The Following Provisions Shall Govern The Procedures For The Termination Of This Contract: (a) Upon Receipt Of A Written Report Of Acts Or Causes Which May Constitute Ground(s) For Termination As Aforementioned, Or Upon Its Own Initiative, The Procuring Entity Shall, Within A Period Of Seven (7) Calendar Days, Verify The Existence Of Such Ground(s) And Cause The Execution Of A Verified Report, With All Relevant Evidence Attached; (b) Upon Recommendation By The Procuring Entity, The Head Of The Procuring Entity Shall Terminate This Contract Only By A Written Notice To The Contractor Conveying The Termination Of This Contract. The Notice Shall State: (i) That This Contract Is Being Terminated For Any Of The Ground(s) Afore-mentioned, And A Statement Of The Acts That Constitute The Ground(s) Constituting The Same; (ii) The Extent Of Termination, Whether In Whole Or In Part; (iii) An Instruction To The Contractor To Show Cause As To Why This Contract Should Not Be Terminated; And (iv) Special Instructions Of The Procuring Entity, If Any. The Notice To Terminate Shall Be Accompanied By A Copy Of The Verified Report; (c) Within A Period Of Seven (7) Calendar Days From Receipt Of The Notice Of Termination, The Contractor Shall Submit To The Head Of The Procuring Entity A Verified Position Paper Stating Why The Contract Should Not Be Terminated. If The Contractor Fails To Show Cause After The Lapse Of The Seven (7) Day Period, Either By Inaction Or By Default, The Head Of The Procuring Entity Shall Issue An Order Terminating The Contract; (d) The Procuring Entity May, At Anytime Before Receipt Of The Bidder’s Verified Position Paper Described In Item (c) Above Withdraw The Notice To Terminate If It Is Determined That Certain Items Or Works Subject Of The Notice Had Been Completed, Delivered, Or Performed Before The Contractor’s Receipt Of The Notice; (e) Within A Non-extendible Period Of Ten (10) Calendar Days From Receipt Of The Verified Position Paper, The Head Of The Procuring Entity Shall Decide Whether Or Not To Terminate This Contract. It Shall Serve A Written Notice To The Contractor Of Its Decision And, Unless Otherwise Provided In The Said Notice, This Contract Is Deemed Terminated From Receipt Of The Contractor Of The Notice Of Decision. The Termination Shall Only Be Based On The Ground(s) Stated In The Notice To Terminate; And (f) The Head Of The Procuring Entity May Create A Contract Termination Review Committee (ctrc) To Assist Him In The Discharge Of This Function. All Decisions Recommended By The Ctrc Shall Be Subject To The Approval Of The Head Of The Procuring Entity. 19.2. Pursuant To Section 69(f) Of Ra 9184 And Without Prejudice To The Imposition Of Additional Administrative Sanctions As The Internal Rules Of The Agency May Provide And/or Further Criminal Prosecution As Provided By Applicable Laws, The Procuring Entity Shall Impose On Contractors After The Termination Of The Contract The Penalty Of Suspension For One (1) Year For The First Offense, Suspension For Two (2) Years For The Second Offense From Participating In The Public Bidding Process, For Violations Committed During The Contract Implementation Stage, Which Include But Not Limited To The Following: (a) Failure Of The Contractor, Due Solely To His Fault Or Negligence, To Mobilize And Start Work Or Performance Within The Specified Period In The Notice To Proceed (“ntp”); (b) Failure By The Contractor To Fully And Faithfully Comply With Its Contractual Obligations Without Valid Cause, Or Failure By The Contractor To Comply With Any Written Lawful Instruction Of The Procuring Entity Or Its Representative(s) Pursuant To The Implementation Of The Contract. For The Procurement Of Infrastructure Projects Or Consultancy Contracts, Lawful Instructions Include But Are Not Limited To The Following: (i) Employment Of Competent Technical Personnel, Competent Engineers And/or Work Supervisors; (ii) Provision Of Warning Signs And Barricades In Accordance With Approved Plans And Specifications And Contract Provisions; (iii) Stockpiling In Proper Places Of All Materials And Removal From The Project Site Of Waste And Excess Materials, Including Broken Pavement And Excavated Debris In Accordance With Approved Plans And Specifications And Contract Provisions; (iv) Deployment Of Committed Equipment, Facilities, Support Staff And Manpower; And (v) Renewal Of The Effectivity Dates Of The Performance Security After Its Expiration During The Course Of Contract Implementation. (c) Assignment And Subcontracting Of The Contract Or Any Part Thereof Or Substitution Of Key Personnel Named In The Proposal Without Prior Written Approval By The Procuring Entity. (d) Poor Performance By The Contractor Or Unsatisfactory Quality And/or Progress Of Work Arising From His Fault Or Negligence As Reflected In The Constructor's Performance Evaluation System (“cpes”) Rating Sheet. In The Absence Of The Cpes Rating Sheet, The Existing Performance Monitoring System Of The Procuring Entity Shall Be Applied. Any Of The Following Acts By The Contractor Shall Be Construed As Poor Performance: (i) Negative Slippage Of 15% And Above Within The Critical Path Of The Project Due Entirely To The Fault Or Negligence Of The Contractor; And (ii) Quality Of Materials And Workmanship Not Complying With The Approved Specifications Arising From The Contractor's Fault Or Negligence. (e) Willful Or Deliberate Abandonment Or Non-performance Of The Project Or Contract By The Contractor Resulting To Substantial Breach Thereof Without Lawful And/or Just Cause. In Addition To The Penalty Of Suspension, The Performance Security Posted By The Contractor Shall Also Be Forfeited. 20. Force Majeure, Release From Performance 20.1. For Purposes Of This Contract The Terms “force Majeure” And “fortuitous Event” May Be Used Interchangeably. In This Regard, A Fortuitous Event Or Force Majeure Shall Be Interpreted To Mean An Event Which The Contractor Could Not Have Foreseen, Or Which Though Foreseen, Was Inevitable. It Shall Not Include Ordinary Unfavorable Weather Conditions; And Any Other Cause The Effects Of Which Could Have Been Avoided With The Exercise Of Reasonable Diligence By The Contractor. 20.2. If This Contract Is Discontinued By An Outbreak Of War Or By Any Other Event Entirely Outside The Control Of Either The Procuring Entity Or The Contractor, The Procuring Entity’s Representative Shall Certify That This Contract Has Been Discontinued. The Contractor Shall Make The Site Safe And Stop Work As Quickly As Possible After Receiving This Certificate And Shall Be Paid For All Works Carried Out Before Receiving It And For Any Work Carried Out Afterwards To Which A Commitment Was Made. 20.3. If The Event Continues For A Period Of Eighty Four (84) Days, Either Party May Then Give Notice Of Termination, Which Shall Take Effect Twenty Eight (28) Days After The Giving Of The Notice. 20.4. After Termination, The Contractor Shall Be Entitled To Payment Of The Unpaid Balance Of The Value Of The Works Executed And Of The Materials And Plant Reasonably Delivered To The Site, Adjusted By The Following: (a) Any Sum To Which The Contractor Is Entitled Under Gcc Clause 28; (b) The Cost Of His Suspension And Demobilization; (c) Any Sum To Which The Procuring Entity Is Entitled. 20.5. The Net Balance Due Shall Be Paid Or Repaid Within A Reasonable Time Period From The Time Of The Notice Of Termination. 21. Resolution Of Disputes 21.1. If Any Dispute Or Difference Of Any Kind Whatsoever Shall Arise Between The Parties In Connection With The Implementation Of The Contract Covered By The Act And This Irr, The Parties Shall Make Every Effort To Resolve Amicably Such Dispute Or Difference By Mutual Consultation. 21.2. If The Contractor Believes That A Decision Taken By The Procuring Entity’s Representative Was Either Outside The Authority Given To The Procuring Entity’s Representative By This Contract Or That The Decision Was Wrongly Taken, The Decision Shall Be Referred To The Arbiter Indicated In The Scc Within Fourteen (14) Days Of The Notification Of The Procuring Entity’s Representative’s Decision. 21.3. Any And All Disputes Arising From The Implementation Of This Contract Covered By The R.a. 9184 And Its Irr Shall Be Submitted To Arbitration In The Philippines According To The Provisions Of Republic Act No. 876, Otherwise Known As The “ Arbitration Law” And Republic Act 9285, Otherwise Known As The “alternative Dispute Resolution Act Of 2004”: Provided, However, That, Disputes That Are Within The Competence Of The Construction Industry Arbitration Commission To Resolve Shall Be Referred Thereto. The Process Of Arbitration Shall Be Incorporated As A Provision In This Contract That Will Be Executed Pursuant To The Provisions Of The Act And Its Irr: Provided, Further, That, By Mutual Agreement, The Parties May Agree In Writing To Resort To Other Alternative Modes Of Dispute Resolution. 22. Suspension Of Loan, Credit, Grant, Or Appropriation In The Event That The Funding Source Suspends The Loan, Credit, Grant, Or Appropriation To The Procuring Entity, From Which Part Of The Payments To The Contractor Are Being Made: (a) The Procuring Entity Is Obligated To Notify The Contractor Of Such Suspension Within Seven (7) Days Of Having Received The Suspension Notice. (b) If The Contractor Has Not Received Sums Due It For Work Already Done Within Forty Five (45) Days From The Time The Contractor’s Claim For Payment Has Been Certified By The Procuring Entity’s Representative, The Contractor May Immediately Issue A Suspension Of Work Notice In Accordance With Gcc Clause 45.2. 23. Procuring Entity’s Representative’s Decisions 23.1. Except Where Otherwise Specifically Stated, The Procuring Entity’s Representative Will Decide Contractual Matters Between The Procuring Entity And The Contractor In The Role Representing The Procuring Entity. 23.2. The Procuring Entity’s Representative May Delegate Any Of His Duties And Responsibilities To Other People, Except To The Arbiter, After Notifying The Contractor, And May Cancel Any Delegation After Notifying The Contractor. 24. Approval Of Drawings And Temporary Works By The Procuring Entity’s Representative 24.1. All Drawings Prepared By The Contractor For The Execution Of The Temporary Works, Are Subject To Prior Approval By The Procuring Entity’s Representative Before Its Use. 24.2. The Contractor Shall Be Responsible For Design Of Temporary Works. 24.3. The Procuring Entity’s Representative’s Approval Shall Not Alter The Contractor’s Responsibility For Design Of The Temporary Works. 24.4. The Contractor Shall Obtain Approval Of Third Parties To The Design Of The Temporary Works, When Required By The Procuring Entity. 25. Acceleration And Delays Ordered By The Procuring Entity’s Representative 25.1. When The Procuring Entity Wants The Contractor To Finish Before The Intended Completion Date, The Procuring Entity’s Representative Will Obtain Priced Proposals For Achieving The Necessary Acceleration From The Contractor. If The Procuring Entity Accepts These Proposals, The Intended Completion Date Will Be Adjusted Accordingly And Confirmed By Both The Procuring Entity And The Contractor. 25.2. If The Contractor’s Financial Proposals For An Acceleration Are Accepted By The Procuring Entity, They Are Incorporated In The Contract Price And Treated As A Variation. 26. Extension Of The Intended Completion Date 26.1. The Procuring Entity’s Representative Shall Extend The Intended Completion Date If A Variation Is Issued Which Makes It Impossible For The Intended Completion Date To Be Achieved By The Contractor Without Taking Steps To Accelerate The Remaining Work, Which Would Cause The Contractor To Incur Additional Costs. No Payment Shall Be Made For Any Event Which May Warrant The Extension Of The Intended Completion Date. 26.2. The Procuring Entity’s Representative Shall Decide Whether And By How Much To Extend The Intended Completion Date Within Twenty One (21) Days Of The Contractor Asking The Procuring Entity’s Representative For A Decision Thereto After Fully Submitting All Supporting Information. If The Contractor Has Failed To Give Early Warning Of A Delay Or Has Failed To Cooperate In Dealing With A Delay, The Delay By This Failure Shall Not Be Considered In Assessing The New Intended Completion Date. 27. Right To Vary 27.1. The Procuring Entity’s Representative With The Prior Approval Of The Procuring Entity May Instruct Variations, Up To A Maximum Cumulative Amount Of Ten Percent (10%) Of The Original Contract Cost. 27.2. Variations Shall Be Valued As Follows: (a) At A Lump Sum Price Agreed Between The Parties; (b) Where Appropriate, At Rates In This Contract; (c) In The Absence Of Appropriate Rates, The Rates In This Contract Shall Be Used As The Basis For Valuation; Or Failing Which (d) At Appropriate New Rates, Equal To Or Lower Than Current Industry Rates And To Be Agreed Upon By Both Parties And Approved By The Head Of The Procuring Entity. 28. Contractor's Right To Claim If The Contractor Incurs Cost As A Result Of Any Of The Events Under Gcc Clause 13, The Contractor Shall Be Entitled To The Amount Of Such Cost. If As A Result Of Any Of The Said Events, It Is Necessary To Change The Works, This Shall Be Dealt With As A Variation. 29. Dayworks 29.1. Subject To Gcc Clause 43 On Variation Order, And If Applicable As Indicated In The Scc, The Day Works Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 29.2. All Work To Be Paid For As Day Works Shall Be Recorded By The Contractor On Forms Approved By The Procuring Entity’s Representative. Each Completed Form Shall Be Verified And Signed By The Procuring Entity’s Representative Within Two Days Of The Work Being Done. 29.3. The Contractor Shall Be Paid For Day Works Subject To Obtaining Signed Dayworks Forms. 30. Early Warning 30.1. The Contractor Shall Warn The Procuring Entity’s Representative At The Earliest Opportunity Of Specific Likely Future Events Or Circumstances That May Adversely Affect The Quality Of The Work, Increase The Contract Price, Or Delay The Execution Of The Works. The Procuring Entity’s Representative May Require The Contractor To Provide An Estimate Of The Expected Effect Of The Future Event Or Circumstance On The Contract Price And Completion Date. The Estimate Shall Be Provided By The Contractor As Soon As Reasonably Possible. 30.2. The Contractor Shall Cooperate With The Procuring Entity’s Representative In Making And Considering Proposals For How The Effect Of Such An Event Or Circumstance Can Be Avoided Or Reduced By Anyone Involved In The Work And In Carrying Out Any Resulting Instruction Of The Procuring Entity’s Representative. 31. Program Of Work 31.1. Within The Time Stated In The Scc, The Contractor Shall Submit To The Procuring Entity’s Representative For Approval A Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. 31.2. An Update Of The Program Of Work Shall The Show The Actual Progress Achieved On Each Activity And The Effect Of The Progress Achieved On The Timing Of The Remaining Work, Including Any Changes To The Sequence Of The Activities. 31.3. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 31.4. The Procuring Entity’s Representative’s Approval Of The Program Of Work Shall Not Alter The Contractor’s Obligations. The Contractor May Revise The Program Of Work And Submit It To The Procuring Entity’s Representative Again At Any Time. A Revised Program Of Work Shall Show The Effect Of Any Approved Variations. 31.5. When The Program Of Work Is Updated, The Contractor Shall Provide The Procuring Entity’s Representative With An Updated Cash Flow Forecast. The Cash Flow Forecast Shall Include Different Currencies, As Defined In The Contract, Converted As Necessary Using The Contract Exchange Rates. 31.6. All Variations Shall Be Included In Updated Program Of Work Produced By The Contractor. 32. Management Conferences 32.1. Either The Procuring Entity’s Representative Or The Contractor May Require The Other To Attend A Management Conference. The Management Conference Shall Review The Plans For Remaining Work And Deal With Matters Raised In Accordance With The Early Warning Procedure. 32.2. The Procuring Entity’s Representative Shall Record The Business Of Management Conferences And Provide Copies Of The Record To Those Attending The Conference And To The Procuring Entity . The Responsibility Of The Parties For Actions To Be Taken Shall Be Decided By The Procuring Entity’s Representative Either At The Management Conference Or After The Management Conference And Stated In Writing To All Who Attended The Conference. 33. Bill Of Quantities 33.1. The Bill Of Quantities Shall Contain Items Of Work For The Construction, Installation, Testing, And Commissioning Of Work To Be Done By The Contractor. 33.2. The Bill Of Quantities Is Used To Calculate The Contract Price. The Contractor Is Paid For The Quantity Of The Work Done At The Rate In The Bill Of Quantities For Each Item. 33.3. If The Final Quantity Of Any Work Done Differs From The Quantity In The Bill Of Quantities For The Particular Item And Is Not More Than Twenty Five Percent (25%) Of The Original Quantity, Provided The Aggregate Changes For All Items Do Not Exceed Ten Percent (10%) Of The Contract Price, The Procuring Entity’s Representative Shall Make The Necessary Adjustments To Allow For The Changes Subject To Applicable Laws, Rules, And Regulations. 33.4. If Requested By The Procuring Entity’s Representative, The Contractor Shall Provide The Procuring Entity’s Representative With A Detailed Cost Breakdown Of Any Rate In The Bill Of Quantities. 34. Instructions, Inspections And Audits 34.1. The Procuring Entity’s Personnel Shall At All Reasonable Times During Construction Of The Work Be Entitled To Examine, Inspect, Measure And Test The Materials And Workmanship, And To Check The Progress Of The Construction. 34.2. If The Procuring Entity’s Representative Instructs The Contractor To Carry Out A Test Not Specified In The Specification To Check Whether Any Work Has A Defect And The Test Shows That It Does, The Contractor Shall Pay For The Test And Any Samples. If There Is No Defect, The Test Shall Be A Compensation Event. 34.3. The Contractor Shall Permit The Funding Source Named In The Scc To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Appointed By The Funding Source, If So Required By The Funding Source. 35. Identifying Defects The Procuring Entity’s Representative Shall Check The Contractor’s Work And Notify The Contractor Of Any Defects That Are Found. Such Checking Shall Not Affect The Contractor’s Responsibilities. The Procuring Entity’s Representative May Instruct The Contractor To Search Uncover Defects And Test Any Work That The Procuring Entity’s Representative Considers Below Standards And Defective. 36. Cost Of Repairs Loss Or Damage To The Works Or Materials To Be Incorporated In The Works Between The Start Date And The End Of The Defects Liability Periods Shall Be Remedied By The Contractor At The Contractor’s Cost If The Loss Or Damage Arises From The Contractor’s Acts Or Omissions. 37. Correction Of Defects 37.1. The Procuring Entity’s Representative Shall Give Notice To The Contractor Of Any Defects Before The End Of The Defects Liability Period, Which Isone (1) Year From Project Completion Up To Final Acceptance By The Procuring Entity’s. 37.2. Every Time Notice Of A Defect Is Given, The Contractor Shall Correct The Notified Defect Within The Length Of Time Specified In The Procuring Entity’s Representative’s Notice. 37.3. The Contractor Shall Correct The Defects Which He Notices Himself Before The End Of The Defects Liability Period. 37.4. The Procuring Entity Shall Certify That All Defects Have Been Corrected. If The Procuring Entity Considers That Correction Of A Defect Is Not Essential, He Can Request The Contractor To Submit A Quotation For The Corresponding Reduction In The Contract Price. If The Procuring Entity Accepts The Quotation, The Corresponding Change In The Scc Is A Variation. 38. Uncorrected Defects 38.1. The Procuring Entity Shall Give The Contractor At Least Fourteen (14) Days Notice Of His Intention To Use A Third Party To Correct A Defect. If The Contractor Does Not Correct The Defect Himself Within The Period, The Procuring Entity May Have The Defect Corrected By The Third Party. The Cost Of The Correction Will Be Deducted From The Contract Price. 38.2. The Use Of A Third Party To Correct Defects That Are Uncorrected By The Contractor Will In No Way Relieve The Contractor Of Its Liabilities And Warranties Under The Contract. 39. Advance Payment 39.1. The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum Or, At The Most Two, Installments According To A Schedule Specified In The Scc. 39.2. The Advance Payment Shall Be Made Only Upon The Submission To And Acceptance By The Procuring Entity Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, A Bank Guarantee Or A Surety Bond Callable Upon Demand, Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission And Confirmed By The Procuring Entity. 39.3. The Advance Payment Shall Be Repaid By The Contractor By An Amount Equal To The Percentage Of The Total Contract Price Used For The Advance Payment. 39.4. The Contractor May Reduce His Standby Letter Of Credit Or Guarantee Instrument By The Amounts Refunded By The Monthly Certificates In The Advance Payment. 39.5. The Procuring Entity Will Provide An Advance Payment On The Contract Price As Stipulated In The Conditions Of Contract, Subject To The Maximum Amount Stated In Scc Clause 39.1. 40. Progress Payments 40.1. The Contractor May Submit A Request For Payment For Work Accomplished. Such Request For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 40.2. The Procuring Entity Shall Deduct The Following From The Certified Gross Amounts To Be Paid To The Contractor As Progress Payment: (a) Cumulative Value Of The Work Previously Certified And Paid For. (b) Portion Of The Advance Payment To Be Recouped For The Month. (c) Retention Money In Accordance With The Condition Of Contract. (d) Amount To Cover Third Party Liabilities. (e) Amount To Cover Uncorrected Discovered Defects In The Works. 40.3. Payments Shall Be Adjusted By Deducting There From The Amounts For Advance Payments And Retention. The Procuring Entity Shall Pay The Contractor The Amounts Certified By The Procuring Entity’s Representative Within Twenty Eight (28) Days From The Date Each Certificate Was Issued. No Payment Of Interest For Delayed Payments And Adjustments Shall Be Made By The Procuring Entity. 40.4. The First Progress Payment May Be Paid By The Procuring Entity To The Contractor Provided That At Least Twenty Percent (20%) Of The Work Has Been Accomplished As Certified By The Procuring Entity’s Representative. 40.5. Items Of The Works For Which A Price Of “0” (zero) Has Been Entered Will Not Be Paid For By The Procuring Entity And Shall Be Deemed Covered By Other Rates And Prices In The Contract. 41. Payment Certificates 41.1. The Contractor Shall Submit To The Procuring Entity’s Representative Monthly Statements Of The Estimated Value Of The Work Executed Less The Cumulative Amount Certified Previously. 41.2. The Procuring Entity’s Representative Shall Check The Contractor’s Monthly Statement And Certify The Amount To Be Paid To The Contractor. 41.3. The Value Of Work Executed Shall: (a) Be Determined By The Procuring Entity’s Representative; (b) Comprise The Value Of The Quantities Of The Items In The Bill Of Quantities Completed; And (c) Include The Valuations Of Approved Variations. 41.4. The Procuring Entity’s Representative May Exclude Any Item Certified In A Previous Certificate Or Reduce The Proportion Of Any Item Previously Certified In Any Certificate In The Light Of Later Information. 42. Retention 42.1. The Procuring Entity Shall Retain From Each Payment Due To The Contractor An Amount Equal To A Percentage Thereof Using The Rate As Specified In Itb Sub-clause 42.2. 42.2. Progress Payments Are Subject To Retention Of Ten Percent (10%), Referred To As The “retention Money.” Such Retention Shall Be Based On The Total Amount Due To The Contractor Prior To Any Deduction And Shall Be Retained From Every Progress Payment Until Fifty Percent (50%) Of The Value Of Works, As Determined By The Procuring Entity, Are Completed. If, After Fifty Percent (50%) Completion, The Work Is Satisfactorily Done And On Schedule, No Additional Retention Shall Be Made; Otherwise, The Ten Percent (10%) Retention Shall Again Be Imposed Using The Rate Specified Therefore. 42.3. The Total “retention Money” Shall Be Due For Release Upon Final Acceptance Of The Works. The Contractor May, However, Request The Substitution Of The Retention Money For Each Progress Billing With Irrevocable Standby Letters Of Credit From A Commercial Bank, Bank Guarantees Or Surety Bonds Callable On Demand, Of Amounts Equivalent To The Retention Money Substituted For And Acceptable To The Procuring Entity, Provided That The Project Is On Schedule And Is Satisfactorily Undertaken. Otherwise, The Ten (10%) Percent Retention Shall Be Made. Said Irrevocable Standby Letters Of Credit, Bank Guarantees And/or Surety Bonds, To Be Posted In Favor Of The Government Shall Be Valid For A Duration To Be Determined By The Concerned Implementing Office/agency Or Procuring Entity And Will Answer For The Purpose For Which The Ten (10%) Percent Retention Is Intended, I.e., To Cover Uncorrected Discovered Defects And Third Party Liabilities. 42.4. On Completion Of The Whole Works, The Contractor May Substitute Retention Money With An “on Demand” Bank Guarantee In A Form Acceptable To The Procuring Entity. 43. Variation Orders 43.1. Variation Orders May Be Issued By The Procuring Entity To Cover Any Increase/decrease In Quantities, Including The Introduction Of New Work Items That Are Not Included In The Original Contract Or Reclassification Of Work Items That Are Either Due To Change Of Plans, Design Or Alignment To Suit Actual Field Conditions Resulting In Disparity Between The Preconstruction Plans Used For Purposes Of Bidding And The “as Staked Plans” Or Construction Drawings Prepared After A Joint Survey By The Contractor And The Procuring Entity After Award Of The Contract, Provided That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. The Addition/deletion Of Works Should Be Within The General Scope Of The Project As Bid And Awarded. The Scope Of Works Shall Not Be Reduced So As To Accommodate A Positive Variation Order. A Variation Order May Either Be In The Form Of A Change Order Or Extra Work Order. 43.2. A Change Order May Be Issued By The Procuring Entity To Cover Any Increase/decrease In Quantities Of Original Work Items In The Contract. 43.3. An Extra Work Order May Be Issued By The Procuring Entity To Cover The Introduction Of New Work Necessary For The Completion, Improvement Or Protection Of The Project Which Were Not Included As Items Of Work In The Original Contract, Such As, Where There Are Subsurface Or Latent Physical Conditions At The Site Differing Materially From Those Indicated In The Contract, Or Where There Are Duly Unknown Physical Conditions At The Site Of An Unusual Nature Differing Materially From Those Ordinarily Encountered And Generally Recognized As Inherent In The Work Or Character Provided For In The Contract. 43.4. Any Cumulative Variation Order Beyond Ten Percent (10%) Shall Be Subject Of Another Contract To Be Bid Out If The Works Are Separable From The Original Contract. In Exceptional Cases Where It Is Urgently Necessary To Complete The Original Scope Of Work, The Head Of The Procuring Entity May Authorize A Positive Variation Order Go Beyond Ten Percent (10%) But Not More Than Twenty Percent (20%) Of The Original Contract Price, Subject To The Guidelines To Be Determined By The Gppb: Provided, However, That Appropriate Sanctions Shall Be Imposed On The Designer, Consultant Or Official Responsible For The Original Detailed Engineering Design Which Failed To Consider The Variation Order Beyond Ten Percent (10%). 43.5. In Claiming For Any Variation Order, The Contractor Shall, Within Seven (7) Calendar Days After Such Work Has Been Commenced Or After The Circumstances Leading To Such Condition(s) Leading To The Extra Cost, And Within Twenty-eight (28) Calendar Days Deliver A Written Communication Giving Full And Detailed Particulars Of Any Extra Cost In Order That It May Be Investigated At That Time. Failure To Provide Either Of Such Notices In The Time Stipulated Shall Constitute A Waiver By The Contractor For Any Claim. The Preparation And Submission Of Variation Orders Are As Follows: (a) If The Procuring Entity’s Representative/project Engineer Believes That A Change Order Or Extra Work Order Should Be Issued, He Shall Prepare The Proposed Order Accompanied With The Notices Submitted By The Contractor, The Plans Therefore, His Computations As To The Quantities Of The Additional Works Involved Per Item Indicating The Specific Stations Where Such Works Are Needed, The Date Of His Inspections And Investigations Thereon, And The Log Book Thereof, And A Detailed Estimate Of The Unit Cost Of Such Items Of Work, Together With His Justifications For The Need Of Such Change Order Or Extra Work Order, And Shall Submit The Same To The Head Of The Procuring Entity For Approval. (b) The Head Of The Procuring Entity Or His Duly Authorized Representative, Upon Receipt Of The Proposed Change Order Or Extra Work Order Shall Immediately Instruct The Technical Staff Of The Procuring Entity’s To Conduct An On-the-spot Investigation To Verify The Need For The Work To Be Prosecuted. A Report Of Such Verification Shall Be Submitted Directly To The Head Of The Procuring Entity Or His Duly Authorized Representative. (c) The, Head Of The Procuring Entity Or His Duly Authorized Representative, After Being Satisfied That Such Change Order Or Extra Work Order Is Justified And Necessary, Shall Review The Estimated Quantities And Prices And Forward The Proposal With The Supporting Documentation To The Head Of Procuring Entity For Consideration. (d) If, After Review Of The Plans, Quantities And Estimated Unit Cost Of The Items Of Work Involved, The Proper Office Of The Procuring Entity Empowered To Review And Evaluate Change Orders Or Extra Work Orders Recommends Approval Thereof, Head Of The Procuring Entity Or His Duly Authorized Representative, Believing The Change Order Or Extra Work Order To Be In Order, Shall Approve The Same. (e) The Timeframe For The Processing Of Variation Orders From The Preparation Up To The Approval By The Head Of The Procuring Entity Concerned Shall Not Exceed Thirty (30) Calendar Days. 44. Contract Completion Once The Project Reaches An Accomplishment Of Ninety Five (95%) Of The Total Contract Amount, The Procuring Entity May Create An Inspectorate Team To Make Preliminary Inspection And Submit A Punch-list To The Contractor In Preparation For The Final Turnover Of The Project. Said Punch-list Will Contain, Among Others, The Remaining Works, Work Deficiencies For Necessary Corrections, And The Specific Duration/time To Fully Complete The Project Considering The Approved Remaining Contract Time. This, However, Shall Not Preclude The Claim Of The Procuring Entity For Liquidated Damages. 45. Suspension Of Work 45.1. The Procuring Entity Shall Have The Authority To Suspend The Work Wholly Or Partly By Written Order For Such Period As May Be Deemed Necessary, Due To Force Majeure Or Any Fortuitous Events Or For Failure On The Part Of The Contractor To Correct Bad Conditions Which Are Unsafe For Workers Or For The General Public, To Carry Out Valid Orders Given By The Procuring Entity Or To Perform Any Provisions Of The Contract, Or Due To Adjustment Of Plans To Suit Field Conditions As Found Necessary During Construction. The Contractor Shall Immediately Comply With Such Order To Suspend The Work Wholly Or Partly. 45.2. The Contractor Or Its Duly Authorized Representative Shall Have The Right To Suspend Work Operation On Any Or All Projects/activities Along The Critical Path Of Activities After Fifteen (15) Calendar Days From Date Of Receipt Of Written Notice From The Contractor To The District Engineer/regional Director/consultant Or Equivalent Official, As The Case May Be, Due To The Following: (a) There Exist Right-of-way Problems Which Prohibit The Contractor From Performing Work In Accordance With The Approved Construction Schedule. (b) Requisite Construction Plans Which Must Be Owner-furnished Are Not Issued To The Contractor Precluding Any Work Called For By Such Plans. (c) Peace And Order Conditions Make It Extremely Dangerous, If Not Possible, To Work. However, This Condition Must Be Certified In Writing By The Philippine National Police (pnp) Station Which Has Responsibility Over The Affected Area And Confirmed By The Department Of Interior And Local Government (dilg) Regional Director. (d) There Is Failure On The Part Of The Procuring Entity To Deliver Government-furnished Materials And Equipment As Stipulated In The Contract. (e) Delay In The Payment Of Contractor’s Claim For Progress Billing Beyond Forty-five (45) Calendar Days From The Time The Contractor’s Claim Has Been Certified To By The Procuring Entity’s Authorized Representative That The Documents Are Complete Unless There Are Justifiable Reasons Thereof Which Shall Be Communicated In Writing To The Contractor. 45.3. In Case Of Total Suspension, Or Suspension Of Activities Along The Critical Path, Which Is Not Due To Any Fault Of The Contractor, The Elapsed Time Between The Effective Order Of Suspending Operation And The Order To Resume Work Shall Be Allowed The Contractor By Adjusting The Contract Time Accordingly. 46. Payment On Termination 46.1. If The Contract Is Terminated Because Of A Fundamental Breach Of Contract By The Contractor, The Procuring Entity’s Representative Shall Issue A Certificate For The Value Of The Work Done And Materials Ordered Less Advance Payments Received Up To The Date Of The Issue Of The Certificate And Less The Percentage To Apply To The Value Of The Work Not Completed, As Indicated In The Scc. Additional Liquidated Damages Shall Not Apply. If The Total Amount Due To The Procuring Entity Exceeds Any Payment Due To The Contractor, The Difference Shall Be A Debt Payable To The Procuring Entity. 46.2. If The Contract Is Terminated For The Procuring Entity’s Convenience Or Because Of A Fundamental Breach Of Contract By The Procuring Entity, The Procuring Entity’s Representative Shall Issue A Certificate For The Value Of The Work Done, Materials Ordered, The Reasonable Cost Of Removal Of Equipment, Repatriation Of The Contractor’s Personnel Employed Solely On The Works, And The Contractor’s Costs Of Protecting And Securing The Works, And Less Advance Payments Received Up To The Date Of The Certificate. 46.3. The Net Balance Due Shall Be Paid Or Repaid Within Twenty Eight (28) Days From The Notice Of Termination. 46.4. If The Contractor Has Terminated The Contract Under Gcc Clauses 17 Or 18, The Procuring Entity Shall Promptly Return The Performance Security To The Contractor. 47. Extension Of Contract Time 47.1. Should The Amount Of Additional Work Of Any Kind Or Other Special Circumstances Of Any Kind Whatsoever Occur Such As To Fairly Entitle The Contractor To An Extension Of Contract Time, The Procuring Entity Shall Determine The Amount Of Such Extension; Provided That The Procuring Entity Is Not Bound To Take Into Account Any Claim For An Extension Of Time Unless The Contractor Has, Prior To The Expiration Of The Contract Time And Within Thirty (30) Calendar Days After Such Work Has Been Commenced Or After The Circumstances Leading To Such Claim Have Arisen, Delivered To The Procuring Entity Notices In Order That It Could Have Investigated Them At That Time. Failure To Provide Such Notice Shall Constitute A Waiver By The Contractor Of Any Claim. Upon Receipt Of Full And Detailed Particulars, The Procuring Entity Shall Examine The Facts And Extent Of The Delay And Shall Extend The Contract Time Completing The Contract Work When, In The Procuring Entity’s Opinion, The Findings Of Facts Justify An Extension. 47.2. No Extension Of Contract Time Shall Be Granted The Contractor Due To (a) Ordinary Unfavorable Weather Conditions And (b) Inexcusable Failure Or Negligence Of Contractor To Provide The Required Equipment, Supplies Or Materials. 47.3. Extension Of Contract Time May Be Granted Only When The Affected Activities Fall Within The Critical Path Of The Pert/cpm Network. 47.4. No Extension Of Contract Time Shall Be Granted When The Reason Given To Support The Request For Extension Was Already Considered In The Determination Of The Original Contract Time During The Conduct Of Detailed Engineering And In The Preparation Of The Contract Documents As Agreed Upon By The Parties Before Contract Perfection. 47.5. Extension Of Contract Time Shall Be Granted For Rainy/unworkable Days Considered Unfavorable For The Prosecution Of The Works At The Site, Based On The Actual Conditions Obtained At The Site, In Excess Of The Number Of Rainy/unworkable Days Pre-determined By The Procuring Entity In Relation To The Original Contract Time During The Conduct Of Detailed Engineering And In The Preparation Of The Contract Documents As Agreed Upon By The Parties Before Contract Perfection, And/or For Equivalent Period Of Delay Due To Major Calamities Such As Exceptionally Destructive Typhoons, Floods And Earthquakes, And Epidemics, And For Causes Such As Non-delivery On Time Of Materials, Working Drawings, Or Written Information To Be Furnished By The Procuring Entity, Non-acquisition Of Permit To Enter Private Properties Within The Right-of-way Resulting In Complete Paralyzation Of Construction Activities, And Other Meritorious Causes As Determined By The Procuring Entity’s Representative And Approved By The Head Of The Procuring Entity. Shortage Of Construction Materials, General Labor Strikes, And Peace And Order Problems That Disrupt Construction Operations Through No Fault Of The Contractor May Be Considered As Additional Grounds For Extension Of Contract Time Provided They Are Publicly Felt And Certified By Appropriate Government Agencies Such As Dti, Dole, Dilg, And Dnd, Among Others. The Written Consent Of Bondsmen Must Be Attached To Any Request Of The Contractor For Extension Of Contract Time And Submitted To The Procuring Entity For Consideration And The Validity Of The Performance Security Shall Be Correspondingly Extended. 48. Price Adjustment Except For Extraordinary Circumstances As Determined By Neda And Approved By The Gppb, No Price Adjustment Shall Be Allowed. Nevertheless, In Cases Where The Cost Of The Awarded Contract Is Affected By Any Applicable New Laws, Ordinances, Regulations, Or Other Acts Of The Gop, Promulgated After The Date Of Bid Opening, A Contract Price Adjustment Shall Be Made Or Appropriate Relief Shall Be Applied On A No Loss-no Gain Basis. 49. Completion The Contractor Shall Request The Procuring Entity’s Representative To Issue A Certificate Of Completion Of The Works, And The Procuring Entity’s Representative Will Do So Upon Deciding That The Work Is Completed. 50. Taking Over The Procuring Entity Shall Take Over The Site And The Works Within Seven (7) Days From The Date The Procuring Entity’s Representative Issues A Certificate Of Completion. 51. Operating And Maintenance Manuals 51.1. If “as Built” Drawings And/or Operating And Maintenance Manuals Are Required, The Contractor Shall Supply Them By The Dates Stated In The Scc. 51.2. If The Contractor Does Not Supply The Drawings And/or Manuals By The Dates Stated In The Scc, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative Shall Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Gcc Clause 1.16 The Intended Completion Date Is 90 Cd From Ntp. 1.21 The Procuring Entity Is Lgu- Mapanas, Northern Samar. 1.22 The Procuring Entity’s Representative Is Atty. Ronn Michael L. Tejano Municipal Mayor Municipality Of Mapanas Province Of Northern Samar 1.23 The Site Is Located At Mapanas, Northern Samar. 1.27 The Start Date Is: Upon Receipt Of Notice To Proceed. 1.30 The Works Consist Of: Item No. Scope Of Work Quantity Unit Repair/rehabilitation Of Mapanas Rhu, Barangay Del Norte, Mapanas, N. Samar. B. 5 Project Billboard/signboard 1.00 Lot Lot B.7 Construction Safety And Health 1.00 Lot Lot B.9 Mobilization And Demobilization 1.00 Lot Lot 801(7)a Removal Of Structures And Obstruction 1.00 Is Is 900(1)c1 Structural Concrete (class A), 28 Days 9.15 Cu.m. Cu.m. 902(1) A Reinforcing Steel, Deformed Grade 40 541.72 Kg. Kg 903 Formworks And Falseworks 53.38 Sq.m. Sq.m. 1047 Metal Structures 84.00 In.m. In.m 1013 Corrugated Metal Roofing, Gauge 24 9.00 Sq.m. Sq.m. 1046 Masonry Works 75.60 Sq.m. Sq.m. 1003 Carpentry And Joinery Works 38.78 Sq.m. Sq.m. 1005 Doors And Windows 3.00 Sets Sets 1002 Plumbing Works 1.00 Lot Lot 1032 Painting Varnishing And Other Related Works 411.00 Sq.m. Sq.m. 1101 Wires And Wiring Devices 1.00 Is Is 1002 (1) Panel Board With Main Breaker And Branc 1.00 Is Is 1103 Lighting Fixtures And Lamps 1.00 Is Is Spcl1 Signages 1.00 Lot Lot 2.2 Note: The Items To Follow 5.1 The Procuring Entity Shall Give Possession Of All Parts Of The Site To The Contractor Upon The Issuance Of Notice To Proceed. 6.5 The Contractor Shall Employ The Following Key Personnel: Key Personnel Number Civil Engineer 1 Construction Foreman 1 Skilled Workers 3 Welder 3 7.4(c) “no Further Instructions”. 7.7 No Further Instructions. 8.1 No Further Instructions. 10 The Site Investigation Reports Are: None 12.3 No Further Instructions. 12.5 In Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures: Five (5) Years. 13 “no Additional Provision.” 18.3(h)(i) No Further Instructions. 21.2 The Arbiter Is: Construction Industry Arbitration Commission 29.1 No Day Works Are Applicable To The Contract. 31.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within 15days Of Delivery Of The Letter Of Acceptance. 31.3 The Period Between Program Of Work Updates Is 15days. The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is P 1,000.00. 34.3 The Funding Source Is Coming From Nia 39.1 The Amount Of The Advance Payment Is 15% Of The Contract Price (lump Sum) And Shall Be Release Once Upon Presentation Of The Following Documents As Required: 1. Letter Request For Advance Payment From The Contractor 2. Bank Guarantee For Advance Payment 40.1 Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Be Included For Payment. 51.1 The Date By Which Operating And Maintenance Manuals Are Required Is Not Applicable. The Date By Which “as Built” Drawings Are Required Is 20 Days Upon Completion Of The Subproject. 51.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is P1,000.00. Section Vi. Specifications Project Name: Repair/rehabilitation Of Mapanas Rhu Location : Brgy. Del Norte, Mapanas, Northern Samar Item No. Description Qty. Unit. B.5 Project Billborad/signboard 1.00 Lot A. Material A. Tarpaulin ( 4’x8’) 1.00 Set B. Plywood Marine (1/4”x1.2mx2.44) 1.00 Pc C. Coco Lumber, 2”x3”x12” 42.00 Bd.ft. D. Common Nails Assorted 0.50 Kg B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) (1 Gang = Foreman 1 Carpenter, 1 Laborer 1.00 1.00 E. Labor Requirement Foreman 1.00 1.00 Skilled Carpenter 1.00 1.00 Unskilled 1.00 1.00 B. 7 Construction Safety And Health 1.00 Lot A Material A. Safety Helmet 5.00 Pc B. Safety Shoes 5.00 Pc C. Safety Vest 5.00 Pc D. Working Gloves 5.00 Pc E. Face Mask (surgical/cloth) 5.00 Box F. Eye Goggles 5.00 Pc G. Sanitizing Solution 3.00 Lit H. Ethyl Alcohol 3.00 Lit I. Disinfectant Spray 3.00 Can J. Liquid Hand Soap 3.00 Lit B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) E. Labor Requirement A. Safety Officer 1.00 15.00 B. Health Personnel (full Time First Aider) 1.00 15.00 C. Sanitation Aide 1.00 15.00 B. 9 Mobilization And Demobilization 1.00 Lot A. Material B. Freight And Handling C. Name And Capacity Equipment Cargo/service Truck (2-5mt) 1.00 2.00 D. Labor Derivation (subsidiary Work Description) E. Labor Requirement 900(1)c1 Structural Concrete (class A), 28 Days 9.15 Cu.m. A. Material A Portland Cement, Typ1 1 83.00 Bag B. Gravel, ¾” 8.00 Cu.m. C. Sand, Washed 5.00 Cu.m. B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) E. Labor Requirement Foreman 1.00 2.00 Skilled Mason 2.00 2.00 Unskilled 8.00 2.00 I Total Estimated Direct Cost Ii Indirect Cost Ocm (up To 12-15%) Contractor’s Profit Cost (8-10%) Vat (5%) Iii A. Material A. Rsb, Deformed, 10mmo 34 Pcs B. Rsb, Deformed, 12mmo 78 Pcs. C. Tie Wire# 16 10.00 Kg B. Freight And Handling C. Name And Capacity Of Equipment Bar Cutter, Single Phase 1.00 2.00 D. Labor Derivation (subsidiary Work Description) (1 Gang=1-foreman, 1 Steelman, 1-laborer 80kgs/day/gang 541.72 80.00 E. Labor Requirement Foreman 1 2.00 Skilled Steel Man 4.00 2.00 Unskilled 4.00 2.00 I Total Estimated Direct Cost Ii Indirect Cost Ocm (up To 12-15%) Contractor’s Profit, Cost (8-10%) Vat (5%) 1047 Metal Structures A. Material A. Tubular 2”x4”x6m 14.00 Pc B. Sliding Mechanism 1.00 Set C. Grinding Desk 8.00 Pc D. Cutting Desk 20.00 Pc E. Welding Rod 25.00 Kg F. Paint Red Lead 1.00 Gal G. Paint Brush, 2” 4.00 Pc H. Epoxy Paint Finish 2.00 Gal I. Barrel Bolt Set Padlock 1.00 Set B. Freight And Handling C. Name And Capacity Of Equipment Welding Machine, Electric Driven/dc Outpit 1.00 10.00 D. Labor Derivation (subsidiary Work Description) 84.00 9.00 E. Labor Requirement Foreman 1.00 10.00 Skilled Welder 2.00 10.00 Unskilled 3.00 10.00 I Total Estimated Direct Cost Ii Indirect Cost Ocm (up To 12-15%) Contractor’s Profit Cost (8-10%) Vat (5%) 1013 Corrugated Metal Roofing, Gauge 24 9.00 Sq.m. A. Pre-painted Metal Roofing Sheet Ga. 24x2.44m.) 9.00 In.m. B. J Bolt 1/4x21”, With Nut And Bonded Washer 72.00 Pc. C. Touchup Paint 4.00 L D. Paint Brush, 2” 2.00 Pc E. Pre-painted Metal Ridge Cap Ga. 24x2.44m 6.00 Pc F. Pre-painted Metal End Wall Flashing Ga. 24x2.44m 3.00 Pc G. Pre-painted Metal Gutter Ga. 24x2.44m 18.00 Pc B. Freight And Handling C. Name And Capacity Of Equipment A.scaffolding 1.00 3.00 D. Labor Derivation (subsidiary Work Description) Roofing Sheets Installation Install: 1 Gang= 1foreman, 1 Carpenter, 3- Laborers 9.00 20.00 Roofing Gutter, Wall Flashing And Ridge Cap Installation Install: 1 Gang=1-foreman, 1-carpenter, 3-laborers Capability: 12 Pcs/day/gang 27.00 12.00 E. Labor Requirement Foreman 1.00 3.00 Skilled Carpenter 1.00 3.00 Unskilled 3.00 3.00 I. Total Estimated Direct Cost Ii. Indirect Cost Ocm (up To 12-15%) Contractor’s Profit Cost (8-10%) Vat (5%) 1046 Masonry Works 75.60 Sq.m. A Material Chb Laying A. Chb Ordinary, 4” 331.00 Pc. B. Portland Cement, Type I 20.00 Bag C. Sand, Washed 1.00 Cu.m. D. Rsb, Deformed, 10mmo 18.00 Pcs. E. Tie Wire # 16 5.00 Kg F. Hacksaw Blade, Heavy Duty 2.00 Pc. G. Concrete Baluster 306 Pcs. Plastering A. Portland Cement, Type 1 10.00 Bag B. Sand, Washed 1.00 Cu.m. B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) Chb Laying Install 1 Gang= 1-foreman, 2 Mason, 3 Laborers Capacity, 230 Pcs. Chb /day/gang 331.00 1.00 Chb Plastering Install: 1 Gang= 1 Foreman, 2-mason, 3 Laborers Capability: 12 Sq.m/day/gang 50.00 1.00 Baluster Laying Install: 1 Gang=1 Foreman, 2-mason, 3-laborers Capability: 130 Pcs Chb/day/gang 306.00 1.00 E. Labor Requirement Chb Laying Foreman 1.00 2.00 Skilled Mason 2.00 2.00 Unskilled 3.00 2.00 Chb Plastering Foreman 1.00 5.00 Skilled Mason 2.00 5.00 Unskilled 2.00 5.00 Baluster Laying Foreman 1.00 3.00 Skilled Mason 2.00 3.00 Unskilled 3.00 3.00 1003 Carpentry And Joinery Works 38.78 Sq.m. A. Material Ceiling A. Plywood Marine (1/4”x1.2mx2.44m) 14.00 Pc. B. Lumber Good ( Joist) 179.00 Bd.ft. C. Assorted Cwn (1 Kg.)/100 Bd. Ft. Of Lumber) 2.00 Kg D. Assorted Finishing Nails 2.00 Kg. E. Concrete Nails Assorted 1.00 Kg. B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) Ceiling Installation Install: 1 Gang=1 Foreman, 2-carpenters , 2 Laborers Capacity: 15 Sq.m/day/gang 38.78 15.00 E. Labor Requirement Foreman 1.00 3.00 Skilled Carpenter 2.00 3.00 Unskilled 2.00 3.00 1005 Doors And Windows 3.00 Sets A. Material Doors A. D1-powder Coated Aluminum Casement Door (2.1mx2.1m, W/0.4m. Transom) Aluminum Glass Door 4.41 2.00 Sets D2-panel Door For Pwd C.r. With Kick Plate (0.9mx2.1m, W/0.4m Transom) Flush Door 1.89 1.00 Sets 8.82 1.89 Sq.m. Sq.m. B. Lever-type Plush Botton Door Knob 5.00 Set B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) Door Installation Install: 1 Gang = 1-foreman, 1-skilled, 1 Laborer Capability: 10 Sq.m. (doors)day/gang 15.71 10.00 Jamb Installation Install:1 Gang= 1 Foreman, 1 Skilled, 1 Laborer Capability: 4 Sets (jamb) Day/gang 4.00 Window Installation Install: 1 Gang= 1-foreman, 1 Skilled, 1 Laborer Capability: 2.88 Sq.m. (window) /day/gang 2.00 E. Labor Requirement Foreman 1.00 2.00 Skilled Carpenter 1.00 2.00 Unskilled 1.00 2.00 1002 Plumbing Works 1.00 Lot A. Material Cold Water Line A. Pvc Pipes (25.4mm D) 2.00 Pc B. Pvc Pipes (12.7mm D) 6.00 Pc. C. Pvc Coupling (12.7mm D) 3.00 Pc Sewer Line Works D Pvc Elbow (50mm D) 16.00 Pc E. Upvc Pipe, 50mm Dia.x 3m, 5-1000 32.00 Pc F. Solvent Cement, 400cc 2.00 Can Fixtures G. Grab Bar Inwall Support W/ Lift Up Function 32 1.00 Set H. Wall Faucet, ½”x 4”, Stainless Steel 6.00 Pc I. Tissue Holder, Stainless Steel 304, Wall Mounted 1.00 Set J. Soap Holder 1.00 Set B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) Plumbing Installation Install: 1 Gang = 1-foreman, 1 Plumber, 1-laborer Capacity: 8 Pcs. Pipes /day/gang E. Labor Requirement Foreman 1.00 6.00 Skilled Plumber 1.00 6.00 Unskilled 1.00 6.00 1032 Painting, Varnishing And Other Related Works A. Material Concrete/masonry Walls/ceiling A. Concrete Neutralizer 9.00 Gal B. Skimcoat, 20kg 11.00 Bag C. Acrylic, Solvent Based Paint 14.00 Gal D. Paint Latex Flat Elastomeric 14.00 Gal E. Sand Paper 125.00 Pc. F. Paint Brush, 2” 20.00 Pc. G. Paint Roller 20.00 Pc. B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) Plumbing Installation Install : 1 Gang = 1 Foreman, 1-paintor, 1-laborer, Capability: 30 Sq.m. (roller)/day/gang 411.21 30.00 E. Labor Requirement Foreman 1.00 7.00 Skilled Painter 2.00 7.00 Unskilled 2.00 7.00 1101 Wires And Wiring Devices A. Material A. Electric Wires Thnn/thhn 3.5 Mm2 150.00 M B. Electric Wires Thwn/thhn 5.5mm2 50.00 M Wiring Devices E Electrical Tape ¾”x20yds 2.00 Pc. B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) Wirings Install: 1 Gang= 1 Foreman, 1electrician, 1 Laborer Capability: 144m/day/gang 200.00 144.00 E. Labor Requirement Foreman 1.00 2.00 Skilled Electrician 1.00 2.00 Unskilled 1.00 2.00 1002 (1) Panel Board With Main Breaker And Branches A. Material A. Panel Board & Cabinets, 2p Main With 6br/2p Bolt On Type 1.00 Set B. Rated 60amp-manual Transfer Switch Breaker Type Nema3 Enclosure 1.00 Set C. 15at,2p,60hz, 230vac Plug In Type Mechanical Lug Circuit Breaker 2.00 Set D. 20at, 2p, 60hz, 230vac Plug In Type Mechanical Lug Circuit Breaker 2.00 Set E. 30at, 2p, 60hz, 230vac Plug In Type Mechanical Lug Circuit Breaker 2.00 Set F. 60at, 2p, 60hz, 230vac Plug In Type Mechanical Lug Circuit Breaker 1.00 Set B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) Panel Board Installation Install: 1gang = 1foreman, 1-electrician, 1-laborer Capability : 1 Set/day/gang 2.00 1.00 E. Labor Requirement Foreman 1.00 2.00 Skilled Electrician 1.00 2.00 Unskilled 1.00 2.00 1103 Lighting Fixtures And Lamps 1.00 Is A. Material A. Solar Lights Lantern Type 22.00 Set B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) Lighting Fixtures Installation Install: 1 Gang =1-foreman, 1-electrician, 1 Laborer Capacity: 8 Pcs/day/gang 22.00 8.00 E. Labor Requirement Foreman 1.00 3.00 Skilled Electrician 1.00 3.00 Unskilled 1.00 3.00 801 (7) A Removal Of Structures And Obstruction 1.00 Is A. Material B. Freight And Handling C. Name And Capacity Of Equipment Welding Machine, Electric Driven/dc Output 1.00 3.00 Cutting Output 1.00 3.00 Cargo/service Truck (2-5 Mt) 1.00 1.00 D. Labor Derivation (subsidiary Work Description) Removal Of Steel Railings Install: 1 Gang = 1foreman, 1 Electrician, 1 Laborer 17.00 8.00 Removal Of Ceiling, Gutter And Roofing Install : 1 Gang= 1 Foreman, 1 Electrician, 1-laborer Capacity: 25 Sq.m./day/gang E. Labor Requiremnt Foreman 1.00 16.00 Skilled Electrician 1.00 16.00 Unskilled 1.00 16.00 Spcl-1 Signages 1.00 Lot A. Material Municipal Signages Pana Flex W/ Electrical Wiring 1.00 Lot B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) Installation Of Signages Install: 1 Gang= 1foreman: 1-electrician, 1 Laborer Capability: 4 Set/day/gang 8.00 4.00 Wirings Install: 1 Gang= 1 Foreman, 1-electrician, 1-laborer Capability: 144m/day/gang 150.00 144.00 E. Labor Requirement Foreman 1.00 4.00 Skilled Electrician 1.00 4.00 Unskilled 1.00 4.00 Section Vii. Drawings Bill Of Quantities Item No. Scope Of Work Quantity Unit Unit Cost Total Amount 1.) Repair And Rehabilitation Of Mapanas Rhu, Brgy. Del Norte, Mapanas, N. Samar B.5 Project Billboard 1.00 Lot 5,364.36 5,364.36 B.7 Construction Safety And Haelth 1.00 Lot 39,087.00 39,087.00 B.9 Mobilization And Demobilization 1.00 Lot 12,528.00 12,528.00 801(7)a Removal Of Structures And Obstruction 1.00 Is 44,152.56 44,152.56 900(1)c.1 Structural Concrete (class A), 28 Days 9.15 Cu.m. 7,460.98 68,268.00 902(1) A Reinforcing Steel Deformed Grade 40 541.72 Kg. 75.61 40,958.24 903 Formworks And Falseworks 53.38 Sq.m, 633.38 33,806.56 1047 Metal Structures 84.00 In.m. 1,316.02 110,546.00 1013 Corrugated Metal Roofing, Gauge 24 9.00 Sq.m. 3,893.42 35,040.80 1046 Masonry Works 75.60 Sq.m. 1,946.65 147,166.40 1003 Carpentry And Joinery Works 38.78 Sq.m. 815.55 31,626.84 1005 Doors And Windows 3.00 Sets 18,342.24 55,026.72 1002 Plumbing Works 1.00 Lot 31,754.16 31,754.16 1032 Painting, Varnishing, And Other Related 411.21 Sq.m. 146.77 60,351.96 1101 Wires And Wiring Devices 1.00 Is 12,046.72 12,046.72 1002(1) Panel Board With Main Breaker And Brand 1.00 Is 11,434.72 11,434.72 1103 Lighting Fixtures And Lamps 1.00 Is 52,550.08 52,550.08 Spcl1 Signages 1.00 Lot 36,853.44 36,853.44 Total 828,562.56 Total Cost Of All Line Item Includes Cost Of Contractor’s Profit, Taxes And Ocm. Attached Detailed Cost Estimates Section Ix. Bidding Forms Table Of Contents Bid Form 79 Form Of Contract Agreement 81 Omnibus Sworn Statement 83 Bid Form Date: Iaeb No: To: Lgu-mapanas Northern Samar Address: Mapanas Northern Samar We, The Undersigned, Declare That: We Have Examined And Have No Reservation To The Bidding Documents, Including Addenda, For The Contract Repair/rehabilitation Of Mapanas Rhu, Barangay Del Norte , Mapanas N. Samar (a) We Offer To Execute The Works For This Contract In Accordance With The Bid And Bid Data Sheet, General And Special Conditions Of Contract Accompanying This Bid; The Total Price Of Our Bid, Excluding Any Discounts Offered In Item (d) Below Is: [insert Information]; The Discounts Offered And The Methodology For Their Application Are: [insert Information]; (b) Our Bid Shall Be Valid For A Period Of 120 Days From The Date Fixed For The Bid Submission Deadline In Accordance With The Bidding Documents, And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period; (c) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract; (d) Our Firm, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Have Nationalities From The Following Eligible Countries: [insert Information]; (e) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (f) Our Firm, Its Affiliates Or Subsidiaries, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Has Not Been Declared Ineligible By The Funding Source; (g) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (h) We Understand That You Are Not Bound To Accept The Lowest Evaluated Bid Or Any Other Bid That You May Receive. Name: In The Capacity Of: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Form Of Contract Agreement This Agreement, Made This [insert Date] Day Of [insert Month], [insert Year] Between [name And Address Of Procuring Entity](hereinafter Called The “entity”) And [name And Address Of Contractor] (hereinafter Called The “contractor”). Whereas, The Entity Is Desirous That The Contractor Execute [name And Identification Number Of Contract] (hereinafter Called “the Works”) And The Entity Has Accepted The Bid For [insert The Amount In Specified Currency In Numbers And Words] By The Contractor For The Execution And Completion Of Such Works And The Remedying Of Any Defects Therein. Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents Shall Be Attached, Deemed To Form, And Be Read And Construed As Part Of This Agreement, To Wit: (a) General And Special Conditions Of Contract; (b) Drawings/plans; (c) Specifications; (d) Invitation To Apply For Eligibility And To Bid; (e) Instructions To Bidders; (f) Bid Data Sheet; (g) Addenda And/or Supplemental/bid Bulletins, If Any; (h) Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes; (i) Eligibility Requirements, Documents And/or Statements; (j) Performance Security; (k) Credit Line Issued By A Licensed Bank, If Any; (l) Notice Of Award Of Contract And The Bidder’s Conforme Thereto; (m) Other Contract Documents That May Be Required By Existing Laws And/or The Entity. 3. In Consideration Of The Payments To Be Made By The Entity To The Contractor As Hereinafter Mentioned, The Contractor Hereby Covenants With The Entity To Execute And Complete The Works And Remedy Any Defects Therein In Conformity With The Provisions Of This Contract In All Respects. 4. The Entity Hereby Covenants To Pay The Contractor In Consideration Of The Execution And Completion Of The Works And The Remedying Of Defects Wherein, The Contract Price Or Such Other Sum As May Become Payable Under The Provisions Of This Contract At The Times And In The Manner Prescribed By This Contract. In Witness Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Signed, Sealed, Delivered By The (for The Entity) Signed, Sealed, Delivered By The (for The Contractor). Binding Signature Of Procuring Entity ________________________________________________ Binding Signature Of Contractor _____________________________________________ [addendum Showing The Corrections, If Any, Made During The Bid Evaluation Should Be Attached With This Agreement] Omnibus Sworn Statement Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Represent It In The Bidding For [name Of The Project] Of The [name Of The Procuring Entity]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary And/or To Represent The [name Of Bidder] In The Bidding As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate Issued By The Corporation Or The Members Of The Joint Venture)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder]is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: I Am Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [jurat] * This Form Will Not Apply For Wb Funded Projects.
Closing Date3 Dec 2024
Tender AmountPHP 1 Million (USD 17.8 K)

National Library Of The Philippines Tender

Philippines
Details: Description Invitation To Bid For The Procurement Of Filipiniana Reference/trade Books For Nlp And Nlp-affiliated Public Libraries 1.the National Library Of The Philippines (nlp), Through The Authorized Appropriation For Fy 2025 National Expenditure Program (nep) Intends To Apply The Sum Of Two Million Seven Hundred Ninety-four Thousand One Hundred Thirty-eight Pesos And Sixty Centavos (php2,794,138.60) Being The Approved Budget Contract (abc) To Payments Under The Contract For Pb24-28 Procurement Of Filipiniana Reference/trade Books For Nlp And Nlp-affiliated Public Libraries (early Procurement Activity) (line Item Bidding - 5,503 Volumes). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. No. Project Description Abc Cost Of Bidding Docs Bid Opening Venue 1 Procurement Of Filipiniana Reference/trade Books For Nlp And Nlp-affiliated Public Libraries Php2,794,138.60 Php5,000.00 December 18, 2024; 10:01 Am 3rd Floor Bsd/rpd Office Area, Nlp Building, T.m. Kalaw St. Ermita, Manila 2.the Nlp Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required Within Thirty (30) Working Days Upon Receipt Of Purchase Order. Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3.bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A.bidding Is Restricted To Filipino Citizens/sole Proprietorship, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4.prospective Bidders May Obtain Further Information From The Nlp Bids And Awards Committee (bac) Secretariat Email Address And Inspect The Bidding Documents Posted At The Philippine Government Electronic Procurement System (philgeps) And In Our Official Website At Https://web.nlp.gov.ph/. 5.a Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 21, 2024 From The Given Address And Website Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees Through Email. 6.the Nlp Will Hold An Online Pre-bid Conference On December 2, 2024 At 10:00 Am Through Videoconferencing Which Shall Be Open To All Prospective Bidders. Express Interest By Sending An Email To Bac@nlp.gov.ph With The Subject: Request To Join The Pre-bid Conference For Public Bidding No. 24-28. 7.bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Provided Below On Or Before 10:00 Am Of December 18, 2024. Submit A Soft Copy Of Technical (in Pdf) And Financial (in Word Or Excel) Requirements In Usb Flash Drive. Late Bids Shall Not Be Accepted. 8.all Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9.bid Opening Shall Be On December 18, 2024, 10:01 Am At The 3rd Floor Bsd/rpd Office Area, Nlp Building, T.m. Kalaw St. Ermita, Manila. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10.this Is An Early Procurement Activity (epa) And The Notice Of Award Will Be Issued Once The General Appropriations Act (gaa) 2025 Has Been Approved. 11.the Nlp Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12.for Further Information, Please Refer To: Maureen C. Terrenal Marie Joy H. Bestoir Eleanor C. Siyang Jonathan F. Santos Bac Secretariat National Library Of The Philippines Tel. No.: (02) 5314-2100 Loc. 114/406 / 412 Email: Bac@nlp.gov.ph Website: Https://web.nlp.gov.ph/ 13.you May Visit The Following Websites To Download The Bidding Document: Https://web.nlp.gov.ph/category/bids_opportunities/ Https://notices.philgeps.gov.ph/ (sgd.) Maricel M. Ureña Bac Chairperson Vol ’gapô (at Isang Puting Pilipino, Sa Mundo Ng Mga Amerikanong Karakul Brown)/ Lualhati Bautista. Isbn 9789712737978. 2023. Anvil Pub. 3 295.00 885.00 Vol (path – Fit 2) Physical Activity Towards Health And Fitness Rhytmic Dance And Social Activities. Punzalan, Habana. Isbn 978-621-406-266-9. 2024. Mindshapers Co., Inc. 3 345.00 1,035.00 Vol (path Fit 1) Physical Activity Towards Health And Fitness 1 Health & Wellness Movement Educ. & Exercise Program. Punzalan, Habana. Isbn 978-971-9655-56-5. 2023. Mindshapers Co., Inc. 3 335.00 1,005.00 Vol (path Fit 4 Sports) Menu Of Sports. Punzalan Et Al. Isbn 978-971-9655-85-5. 2024. Mindshapers Co., Inc. 3 345.00 1,035.00 Vol (path-fit 3) Menu Dance : Physical Activity Towards Health And Fitness. Punzalan. Isbn 978-971-9655-57-2. 2023. Mindshapers Co., Inc. 3 300.00 900.00 Vol 10 Most Annoying English Grammar Errors/ Jose Carillo. Isbn 971928237. 2008. Manila Times 2 120.00 240.00 Vol 2024 Amendments To The Tax Code: A Comparative Between The Nirc And Eopt. Manahan. Isbn 978-621-02-2436-8. Hb. 2024. Central Books. 3 1,780.00 5,340.00 Vol 26: Dagli Diagrams. Fajardo, Jayson. Isbn-- 2023. Balangay Books. 3 500.00 1,500.00 Vol 3 Mindful Habits/ Gabbie Villaluz. Isbn 9786219632263. 2020. Shepherds Voice Pub. 2 500.00 1,000.00 Vol 30 Days With Paulo/ Jel Tordesillas. Isbn 978-621-96272-2-1. 2019. Hs Grafik Print/paperkat Books 1 400.00 400.00 Vol 500 Fantastic Facts-chemistry Ws Pacific Publications, Inc ., 9781839233715 56 599.00 33,544.00 Vol 500 Fantastic Facts-geography Ws Pacific Publications, Inc ., 9781839233746 56 599.00 33,544.00 Vol 501 Fantastic Facts-physics Ws Pacific Publications, Inc ., 9781839233739 56 599.00 33,544.00 Vol A Girl & Her Monster: A Classroom’s Secret After Sunset / Shirley Siaton. Isbn 978-621-8371-17-0. 2024. Inky Sword Book Pub. 3 480.00 1,440.00 Vol A Handbook Of Covid-19 – Prevention & Control / Wang Zhou M.d. 2020. Isbn 9789712735912. Anvil Pub. 3 199.00 597.00 Vol A Handbook On The Fundamentals Of Marriage And Its Dissolution. Gomos. Isbn 978-621-02-2421-4. Hb. 2024. Central Books. 3 1,380.00 4,140.00 Vol A Heart That Does Not Cease To Dream! A Missionary’s Jagged Life Journey/ Ramon D. Fruto. Isbn ---. 2023. Claretian Comm. Found. Inc 3 500.00 1,500.00 Vol A Modular Approach In Advanced Writing. Pagalilauan. Isbn 621-418-336-4. 2023. Wiseman’s Books 2 350.00 700.00 Vol A Summary Of Our Nation's History. Atty. Rolando A. Suarez.isbn 978-621-04-4684-5 Paperbound. 2023. Rex Bookstore. 2 800.00 1,600.00 Vol A Walk Through War Memories In Southeast Asia/ Hayase,shinzo. Isbn 9789711012113. 2010. New Day Pub. 2 215.00 430.00 Vol Abstracting And Indexing Made Easy. Buenrostro, J. Isbn 9789719645641. 2018. Great Books Trading 1 395.00 395.00 Vol Accidental Monk: A Chronicle Of Struggle, Faith, And Surrender/ Wil Hernandez. Isbn ----. Claretian Comm. Found. Inc 3 595.00 1,785.00 Vol Accomplices Of The Spirit: The New Paradigm Of Mission/ Jose Cristo Rey Garcia Paredes. Isbn -----. Claretian Comm. Found. Inc 3 425.00 1,275.00 Vol Accounting Research Methods/ Danny A. Cabulay. Isbn 978-621-04-4125-3. 2022. Rex Bookstore. 3 385.00 1,155.00 Vol Action Research (an Essential Writing Guide For Teachers And Would-be Teachers). Bargo, D. Isbn 9789719645801. 2020. Great Books Trading 3 595.00 1,785.00 Vol Add On/ Eyrich Cortez. Isbn 9789717893488. Christian Literature Crusade 3 300.00 900.00 Vol Adequate, But Not Enough / Jose M. De Mesa. Isbn -----. Claretian Comm. Found. Inc 3 165.00 495.00 Vol Adnu @70/ Danilo Gerona. Isbn 9789719330295 . 2010. Ateneo De Naga Univ. Press 3 450.00 1,350.00 Vol Adr Clausetrophobia: A “promdi” Guide To Alternative Dispute Resolution. Atty. Joenar Pueblo. Isbn 980 978-621-04-5012-5. Pb. 2023. Rex Bookstore. 3 980.00 2,940.00 Vol Advance Management Information System. Abante, M.v. Isbn 978-971-9655-24-4. 2023. Mindshapers Co., Inc. 3 525.00 1,575.00 Vol Advanced Social Philosophy. Hermosa Et.al. Isbn 978-621-02-2444-3. Pb. 2024. Central Books. 3 450.00 1,350.00 Vol Age Well/ Rissa Singson Kawpeng. Isbn 9789710072712. 2023. Shepherds Voice Pub. 59 375.25 22,139.75 Vol Agrarian Law. Montemayor. Isbn978-621-02-2437-5. Hb. 2024. Central Books. 3 1,450.00 4,350.00 Vol Ahente 5: The Ultimate Ahente/ Emmanuel Santos. Isbn 9789712736841. 2021. Anvil Pub. 3 250.00 750.00 Vol Alguien Ya Contó Las Horas. Topacio-aplaon. Isbn ___. 2017. Balangay Books. 3 700.00 2,100.00 Vol All The Lonely People/ Kannika Claudine Pena. Isbn 9789718281260. 2023. Milflores Pub. 2 599.00 1,198.00 Vol Allegories And Realities Ofelia Gelvezon‐tequi: In Retrospect. 2021. Ccp 3 600.00 1,800.00 Vol Amic@50:turning Gold: A History Of The Asian Media Information And Communication Center/ Maslog, Crispin. Isbn: --- 2021. New Day Pub. 2 500.00 1,000.00 Vol An Dalan Kan Peregrino/ Victor Dennis T. Nierva. Isbn 9786214720248. 2022. Ateneo De Naga Univ. Press 1 500.00 500.00 Vol An Embrace Of Hope Thoughts Of Pope Francis For The Sick / Edited By Edmondo A.caruana And Lorenzo Tagliaferri ; Translated By Leo-martin Angelo R. Ocampo. Isbn -----. Claretian Comm. Found. Inc 1 120.00 120.00 Vol An Eye For Art Appreciation: Perception And Expression, 2nd Edition. Sonsona, Et Al. Isbn 978-621-409-236-9. 2024. Books Atbp. 3 450.00 1,350.00 Vol Ang Batang Si Nena At Ang Sabi Niyang "um-ah-um-ah-ah!" / Cruz, Abet B. -- Quezon City : Lampara Publishing House, Inc., 2024. 56 199.75 11,186.00 Vol Ang Bisa Ng Pag-uulit Sa Katutubong Panitikan. Isbn 9786214482900. 2023. Admu Press By Golden Books 3 1,750.00 5,250.00 Vol Ang Buhay Ni Lam-ang/ Pedro Bucaneg, Ariel Sotelo Tabag (translator). Isbn 978-621-8389-04-5. 2023. Sadiri Publishing. 3 150.00 450.00 Vol Ang Maganda Sa Teolohiya/ Jose M. De Mesa. Isbn-- 2017. Claretian Comm. Found. Inc 1 140.00 140.00 Vol Ang Mga Prusisyong Dumaan Sa Unang Bangungot/ Frank Cimatu. Isbn 978-971-991-381-8. 2018. Ateneo De Naga Univ. Press 3 550.00 1,650.00 Vol Ang Mundo Kong Kahel Chikiting Books 56 160.00 8,960.00 Vol Ang Pag-ibig Ni Crayon/ Pam Castro. Isbn 978-621-487-003-5 (paperback). 2023. Hs Grafik Print/paperkat Books 3 500.00 1,500.00 Vol Ang Pambansang Alagad, Sining, At Panitikan: Mga Piling Sanaysay/ Bienvenido Lumbera. Isbn 978-971-991-372-6. 2018. Ateneo De Naga Univ. Press 3 200.00 600.00 Vol Ang Pangalan Ng Diyos Ay Awa: Isang Panayam Kasama Si Andrea Tornielli / Papa Francisco. Isbn Claretian Comm. Found. Inc 1 150.00 150.00 Vol Ang Pinakamagarang Sapatos Chikiting Books 56 160.00 8,960.00 Vol Ang Shaket Talaga Bes: Pusong Discipleshape/ Bood Burce. Isbn 9789717893402. Christian Literature Crusade 3 125.00 375.00 Vol Ang Wikang Pambansa At Amerikanisasyon: Isang Kasaysayan Ng Pakikihamok Ng Filipino Para Maging Wikang Pambansa. Isbn 9786214482719. 2023. Admu Press By Golden Books 3 2,250.00 6,750.00 Vol Angel: A Novella / Shirley Siaton. Isbn 978-621-490-061-9. 2024. Inky Sword Book Pub. 1 440.00 440.00 Vol Annotations And Case Law Dissections On Evidence. Gabato. Isbn 978-621-02-2314-9. 2024. Hb. Central Books. 3 1,580.00 4,740.00 Vol Antares. Arguelles, Mesandel. Isbn ---. 2018. Balangay Books. 3 500.00 1,500.00 Vol Application Development And Emerging Technologies. Juaneza, J.p./iligan, S.a.r. Isbn 9786214460212. 2023. Great Books Trading 3 495.00 1,485.00 Vol Archipelagic Baselines And The Philippine Territory. Tria. Isbn 978-621-02-2136-7. 2023. Cb. Central Books. 3 880.00 2,640.00 Vol Artificial Intelligence. Montemayor. Isbn 978-621-02-2290-6. 2024. Hb. Central Books. 3 1,450.00 4,350.00 Vol Arts: Beyond Borders (contemporary Arts From The Regions). Constantino Jr., & Marquez. Isbn 978-621-409-155-3. 2023. Books Atbp. 3 295.00 885.00 Vol At Home With Crazy/ Katrina Martin. Isbn 9789718281222. 2022. Milflores Pub. 3 499.00 1,497.00 Vol At The Crossroads Of Church And World/ Bienvenido Nebres. Isbn 9789712736209. 2021. Anvil Pub. 3 295.00 885.00 Vol At Wars End/ Rony V. Diaz. Isbn 971944706. 2010. Manila Times 3 300.00 900.00 Vol Atra: Mga Tula 1999-2019. Arguelles, Mesandel. Isbn 978-971-9699-22-4. 2020. Balangay Books. 3 1,500.00 4,500.00 Vol Audiam: I Will Listen To Your Words, O Lord/ Duane M. Cartujano. Isbn.-- 2022. Claretian Comm. Found. Inc 1 290.00 290.00 Vol Auslander. Lumen Al Joseph. Isbn 9786219678179. 2023. Balangay Books. 3 700.00 2,100.00 Vol Aviation Mathematics, 2e. Desolo. Isbn 978-621-409-254-3. 2024. Books Atbp. 3 400.00 1,200.00 Vol Babaylan Sing Back: Philippine Shamans And Voice, Gender And Place. Isbn 9786214481873. 2023. Admu Press By Golden Books 3 1,450.00 4,350.00 Vol Balangay: Stories/ Maria Elena Paulma. 2023 Isbn 978-971-9094-38-8. Xavier Univ. Press 3 385.00 1,155.00 Vol Balita: The Story Of Philippine Journalism (1811-2019)/ By Dr. José Victor Torres. Isbn 978-971-07-4461-9. 2021. Vibal Pub. 3 499.00 1,497.00 Vol Bamboo Girls: Stories And Poems From A Forgotten Life/ Ian Rosales Casocot. Isbn 978-971-991-348-1. 2018. Ateneo De Naga Univ. Press 3 500.00 1,500.00 Vol Bansay # 1 James J. O'brien, S.j. - Bikolnon Biography Series (bbs)/ Greg S. Castilla. Isbn 978-971-991-332-0. 2015. Ateneo De Naga Univ. Press 3 100.00 300.00 Vol Bansay #10: Simeon Ola- Bikolnon Biography Series (bbs)/ Christian Dy. Isbn 978-971-991-358-0. 2018. Ateneo De Naga Univ. Press 3 100.00 300.00 Vol Bansay #3 Luis General Jr.- Bikolnon Biography Series (bbs)/jose Martin O. General. Isbn 978-971-991-337-5. 2015. Ateneo De Naga Univ. Press 3 100.00 300.00 Vol Bansay #7: Tomas Arejola- Bikolnon Biography Series (bbs)/ Evelyn Caldera Soriano. Isbn 978-9719913-76-4. 2018. Ateneo De Naga Univ. Press 3 100.00 300.00 Vol Bansay #8: Jorge I. Barlin- Bikolnon Biography Series (bbs)/ Jose Fernando Obias. Isbn 978-971-991-354-2. 2016. Ateneo De Naga Univ. Press 3 100.00 300.00 Vol Bansay #9: Raul S. Roco- Bikolnon Biography Series (bbs)/wilfredo Prilles. Isbn 978-971-991-357-3. 2016. Ateneo De Naga Univ. Press 3 100.00 300.00 Vol Barcelona Criselda Yabes 19th Avenida Publishing House 978-6218264-23-6 2023 56 375.00 21,000.00 Vol Basâ-basa/ Ton Daposala. 2018. Isbn 978-971-9094-23-4. Xavier Univ. Press 3 325.00 975.00 Vol Basic Of Arnis De Mano: A Handbook For Teachers And Students. Anajao, Et Al. Isbn 978-621-409-237-6. 2023. Books Atbp. 3 175.00 525.00 Vol Bata, Bata... Pa'no Ka Ginawa? / Lualhati Bautisata. Isbn 9712738555. 2024. Anvil Pub. 2 295.00 590.00 Vol Batang Matalino Ang Alamat Ng Bayabas Ws Pacific Publications, Inc ., 9789714331284 56 69.75 3,906.00 Vol Batang Matalino Ang Alamat Ng Butiki Ws Pacific Publications, Inc ., 9789714331277 56 69.75 3,906.00 Vol Batang Matalino Ang Alpabetong Filipino Ws Pacific Publications, Inc ., 9786214330935 56 99.75 5,586.00 Vol Batang Matalino Book Ang Alamat Ng Palay Ws Pacific Publications, Inc ., 9786214332205 56 69.00 3,864.00 Vol Bayani Biographies: Andres Bonifacio / By John Ray Ramos And Michael Charleston "xiao" Chua / St. Matthew's Publishing Corporation / 2019 / 978-971- 625-422-8 56 200.00 11,200.00 Vol Bayani Biographies: Apolinario Mabini / By John Ray Ramos / St. Matthew's Publishing Corporation / 2023 / 978-971-625-500-3 56 200.00 11,200.00 Vol Before I Do/ Kath C. Eustaquio-derla. Isbn 978-621-95109-4-3. 2015. Hs Grafik Print/paperkat Books 2 210.00 420.00 Vol Behind That Girl/ Angelica Soriano. Isbn 978-621-487-029-5 (paperback) 2024. Hs Grafik Print/paperkat Books 3 550.00 1,650.00 Vol Behind The Veil: A Guide To Alamat, A History Of The Awakened/ Kadi Serafica. Isbn 978-621-487-018-9. 2024. Hs Grafik Print/paperkat Books 3 300.00 900.00 Vol Better Lovers/ Bo Sanchez. Isbn 9789710072798. 2024. Shepherds Voice Pub. 3 450.00 1,350.00 Vol Better Today Than Yesterday/ Bo Sanchez. Isbn 9789710072774. 2023. Shepherds Voice Pub. 56 427.50 23,940.00 Vol Better Today Than Yesterday/ Bo Sanchez. Isbn 9789710072774. 2023. Shepherds Voice Pub. 3 450.00 1,350.00 Vol Biblical Preaching 3rd Ed/ Haddon Robinson. Isbn 9789710099115.2022. Omf Lit. 3 425.00 1,275.00 Vol Bigkas-galing Sa Pabuhol-dila (tongue Twister). Valverde, O. Isbn 9786214460205. 2023. Great Books Trading 3 120.00 360.00 Vol Bikol Dictionary Vol. 1 And 2/ Malcolm Mintz.. Isbn 9780958038355. 2004. Ateneo De Naga Univ. Press 3 2,500.00 7,500.00 Vol Bikol Studies: Nora/ Jaya Jacobo, Isbn 9782423199004. 2020. Ateneo De Naga Univ. Press 3 400.00 1,200.00 Vol Bikol Studies: Promise/ Frederico Jose Lagdameo. Isbn 9772423199005. 2014. Ateneo De Naga Univ. Press 3 300.00 900.00 Vol Binhi Ng Paglaya/ Amanda Socorro Lacaba Echanis. Isbn 978-621-96513-9-4. 2023. Gantala Press. 3 350.00 1,050.00 Vol Biyak. Montañano, Joyce Rochelle. Isbn --. 2018. Balangay Books. 3 400.00 1,200.00 Vol Black Cat: A Poetry Collection ~ Woman In Verse / Shirley Siaton. Isbn 978-621-8374-86-7. 2024. Inky Sword Book Pub. 3 460.00 1,380.00 Vol Blessed Among Us/ Robert Ellsberg. Isbn -----. Claretian Comm. Found. Inc 3 595.00 1,785.00 Vol Blessedness In Pain/ Rev. Philip Henry B. Morales. Isbn 9798386305062. 2023. Lolakwentosera Book Pub. 2 349.00 698.00 Vol Blood And Gospel: Vampire’s Night Market/amelia D. Pagdanganan. Isbn 978620614381. 2024. Lolakwentosera Book Pub. 3 349.00 1,047.00 Vol Blue Daisies (part 1)/ Arrowheads. Isbn 9712738104. 2024. Anvil Pub. 3 199.00 597.00 Vol Blue Daisies (part 2)/ Arrowheads. Isbn 9712738197. 2024. Anvil Pub. 3 199.00 597.00 Vol Boundless Optimism/ Rosalie De Silva. Isbn 97862181154361. 2020. Shepherds Voice Pub. 3 249.00 747.00 Vol Brave Andres / Malabed, Liwliwa N. -- Quezon City : Lampara Publishing House, Inc., 2024. 56 199.75 11,186.00 Vol Bride Price And Other Stories/ Calbi Anji Asain. 2023. Isbn 978-971-9094-32-6. Xavier Univ. Press 3 450.00 1,350.00 Vol Broken Faith/ Nelson T. Dy. Isbn 9789710099023. 2022. Omf Lit. 3 250.00 750.00 Vol Bum Tiyaya Bum: Philippine Nursery Rhymes And Verse 978-621-422-048-9 2023 56 695.00 38,920.00 Vol Business Writing Bloopers: Common Mistakes To Avoid/ Jonah Chipeco. Isbn 978-621-8232-31-0. 2021. Hs Grafik Print/paperkat Books 1 700.00 700.00 Vol Cabinet Of Curiosities Sb Anvil Publishing, 2023 9712737916 59 395.00 23,305.00 Vol Can You Trust The Bible?/ Harold J. Sala Isbn 9789710098194. 2019. Omf Lit. 3 275.00 825.00 Vol Cancion Kan Tawong Lipod/ H. Francisco V. Penones, Jr. With Select Translations By Marne Kilates. Isbn 978-971-9913-12-2. 2014. Ateneo De Naga Univ. Press 3 280.00 840.00 Vol Canticles For Three Women/ Rony V. Diaz. Isbn 971944708. 2012. Manila Times 1 450.00 450.00 Vol Cely’s Crocodile 971-621-422-041-0 Tahanan Books For Young Readers, 2020 56 195.00 10,920.00 Vol Children Of War / Joan Orendain. Isbn 978-971-97-0819-3 (hardbound). 2023. Vibal Pub. 2 1,400.00 2,800.00 Vol Chosen : No Matter Where You’ve Been Or What You’ve Done / Shaina Cua. Isbn 9789710099535. 2023. Omf Lit. 2 375.00 750.00 Vol Christus Vivit Christ Is Alive! Apostolic Exhortation To Young People And To The Entire People Of God / Pope Francis. Isbn -----. Claretian Comm. Found. Inc 1 245.00 245.00 Vol Church Reforms From Vatican I To Vatican Ii And Beyond: A Historico- Theological Synopsis In The Light Of Pope Francis’ Pastoral Ecclesiology (volume 2) / Jose Mario Bautista Maximiano. Isbn ----. Claretian Comm. Found. Inc 3 390.00 1,170.00 Vol Cogitations/ Nil Guillemette. Claretian Comm. Found. Inc. 2 265.00 530.00 Vol Collected Plays 1: Revitalizing Tradition In Three Full-length Plays. Isbn 9786214483068. 2023. Admu Press By Golden Books. 3 2,100.00 6,300.00 Vol Collected Plays 2: Resurrecting History In Three Full-length Musicals. Isbn 9786214483082. 2023. Admu Press By Golden Books. 3 2,250.00 6,750.00 Vol Collected Short Stories/ F. Sionil Jose. Isbn 9789718845721. 2022. New Day Pub. 3 1,065.00 3,195.00 Vol Colonialism And Modernity Re-mapping Philippine History/ Oscar V. Campomanes Nobutaka Suzuki & Yoshiko Nagano, Editors History. Isbn 978-621-472-027-9. 2022. Ateneo De Naga Univ. Press 3 650.00 1,950.00 Vol Come Back To Me/ Rochit I. Tañedo (creampaper). Isbn 978-621-4720-41-5. 2023. Ateneo De Naga Univ. Press 3 650.00 1,950.00 Vol Coming Home To The Island Poems/ Arlene J. Yandug. 2022. Isbn 978-971-9094-33-3. Xavier Univ. Press 1 440.00 440.00 Vol Commercial Baking With Entrepreneurship Leading To Bread & Pastry Production Nc Ii Revised Edition. Dinaga. Isbn 978-971-9655-11-4. 2022. Mindshapers Co., Inc. 3 475.00 1,425.00 Vol Companioning/ Dr. Joyce Piap-go With Jojie Wong. Isbn 9789710098989. 2021. Omf Lit. 3 150.00 450.00 Vol Comparative Models In Policing/ R. Castillo, Jr. 4th Ed. Isbn 978-621-488-005-8. 2024. Chapter House Pub. 2 548.00 1,096.00 Vol Comparative Models Of Policing And Philippine National Police Policing (based On Prc Tos 2022). Depayso. Isbn 621-418-349-4. 2024. Wiseman’s Books 3 450.00 1,350.00 Vol Compendium Of Laws On Economic Reforms. Dascil. Isbn 978-621-02-2392-7. Hb. 2024. Central Books. 3 1,580.00 4,740.00 Vol Compendium On Customs Disposal Processes. Rubio, Langcay, Agaceta. Isbn 978-621-02-2344-6. 2024. Hb. Central Books. 3 1,180.00 3,540.00 Vol Conceptual Framework And Accounting Standards/ Eugenio V. Villaceran. Isbn 978-621-04-4266-3. 2022. Rex Bookstore. 2 799.00 1,598.00 Vol Condominium Law In A Nutshell (question And Answer). Manuel. Isbn 978-621-02-2408-5. Hb. 2024. Central Books. 3 1,150.00 3,450.00 Vol Conflict’s Long Game: A Decade Of Violence In The Bangsamoro. Isbn 9786214483174. 2023. Admu Press By Golden Books. 3 1,350.00 4,050.00 Vol Conversational Evangelism/ Dr. David Geisler. Isbn 9789710098545. 2019. Omf Lit. 3 325.00 975.00 Vol Cooperatives Law. Montemayor. Isbn 978-621-02-2047-6. 2023. Hb. Central Books. 3 1,780.00 5,340.00 Vol Corpus Juris Tariff And Customs Laws Of The Philippines. Nague. Isbn 978-621-02-2224-1. 2024. Hb. Central Books 3 1,850.00 5,550.00 Vol Covid-19 In The News: Of Seekers, Scoundrels, And Saints. Isbn 9786214483013. 2023. Admu Press By Golden Books. 2 1,350.00 2,700.00 Vol Covid-19 Journals/ Ma. Diosa Labiste, Pinky C. Serafica, Diana G. Mendoza, Chi Laigo Vallido (eds). Isbn 978-621-96513-0-1. 2021. Gantala Press. 2 350.00 700.00 Vol Crave/ Kaye Allen. Isbn 9789712737640. 2023. Anvil Pub. 3 295.00 885.00 Vol Create Law. Montemayor. Isbn 978-621-02-2259-3. Hb.2024. Central Books 3 1,350.00 4,050.00 Vol Created For A Purpose Revised & Updated/ Darlene And Bonnie Sala. Isbn 9789710098668. 2019. Omf Lit. 2 350.00 700.00 Vol Criminal Procedure: A Handbook For Criminology Students 3rd Edition. Gabao/ Tulalia. Isbn 621-418-350-0. 2024. Wiseman’s Books 2 398.00 796.00 Vol Criminological Research - A Self Study Guide. Depayso. Isbn 621-418-321-0. 2024. Wiseman’s Books 3 398.00 1,194.00 Vol Criminological Research 2nd Ed. / C Beit-chavez, B. Paña, M. Patalinghug, B. Salamanca. Isbn 978-621-488-004-1. 2024. Chapter House Pub. 2 528.00 1,056.00 Vol Crossing The River/ Anthony L Tan. 2019 Isbn 978-971-9094-26-5. Xavier Univ. Press 3 325.00 975.00 Vol Culinary Nutrition The Science And Art Of Healthy Cooking. Natad. Isbn 978-971-9655-44-2. 2023. Mindshapers Co., Inc. 3 345.00 1,035.00 Vol Cultural Cache: Selected Works From The Visual Arts Collection Of The Cultural Center Of The Philippines. 2019. Isbn 978-971-8546-71-0. Ccp (softbound) 3 800.00 2,400.00 Vol Culture Shock/ Chip Ingram. Isbn 9789710099399. 2022. Omf Lit. 3 450.00 1,350.00 Vol Dakilang Baliw: From Utak Topak To Brain Kalasag/ Amelia D. Pagdanganan. Isbn 9786210604023. 2024. Lolakwentosera Book Pub. 2 399.00 798.00 Vol Dauntless: The 1st & 2nd Filipino Infantry Regiments, United States Army/ Vallejo, Marie. Isbn 9781961562004. New Day Pub. 3 1,760.00 5,280.00 Vol Dawns/ Isa Garcia, Janina Marie Rivera & Ida Torres. Isbn 9789710098484. 2019. Omf Lit. 3 350.00 1,050.00 Vol Dawwang : Kababaihang Tagapagtanggol Ng Kordilyera / Sulat Ng Gantala Press ; Guhit Ni Nina Martinez. Isbn ___. 2021. Gantala Press. 2 420.00 840.00 Vol Daylight Dialogues (poems And Short Stories). Ong, C. Isbn 9789671422724. 2018. Great Books Trading. 3 695.00 2,085.00 Vol De(sentralisasyon): Mga Maikling Kuwento At Dagli Sa Gilid-gilid/ R.b. Abiva, Ronnel Talusan. Isbn 978-621-96798-3-1. 2023. Sadiri Publishing. 3 400.00 1,200.00 Vol Dear Meg: Advice On Life, Love, And The Struggle/ Introduction By Teo S. Marasigan. Isbn 978-621-96513-7-0. 2022. Gantala Press. 2 450.00 900.00 Vol Dearest Papa Abc Educational Development Center 9789710492411 56 250.00 14,000.00 Vol Death Penalty. Montemayor. Isbn 978-621-02-2187-9. 2024. Hb. Central Books 3 1,480.00 4,440.00 Vol Deck The Halls, Vol. 2/ By Kadi Serafica, [and Six Others]. Isbn 978-621-8232-84-6. 2022. Hs Grafik Print/paperkat Books 1 450.00 450.00 Vol Decolonizing Ifugao History: Indigenous Archaeology In The Philippines (2nd Edition) Stephen B. Acabado Isbn 978-621-472-023-1. 2024. Ateneo De Naga Univ. Press 3 750.00 2,250.00 Vol Deliver Us From Evil/ Jose C. Floresta. Isbn9789717893372. Christian Literature Crusade 3 295.00 885.00 Vol Devotions For Teacher-moms/ Felichi Pangilinan-buizon And Donna Pangilinan-simpao. Isbn 9789710099061. 2022. Omf Lit. 3 275.00 825.00 Vol Dila At Bandila/ Ige Ramos. Isbn 9712737282 2022. Anvil Pub. 3 195.00 585.00 Vol Dinhi Sa Yuta/ Omar Khalid. Isbn 978-621-8389-08-3. 2024. Sadiri Publishing. 3 400.00 1,200.00 Vol Dios Mabalos/ James Jesus Uy Borlagdan. Isbn 9789719913931. 2022. Ateneo De Naga Univ. Press 3 350.00 1,050.00 Vol Diplomacy And Foreign Policy. Lopez. Isbn 978-621-02-2059-9. 2023. Hb. Central Books. 3 1,750.00 5,250.00 Vol Displacement And Disqualifications: Asian Feminist Theological Perspectives. Isbn ---. Claretian Comm. Found. Inc. 3 500.00 1,500.00 Vol Dispute Resolution And Crisis Management In The 21st Century. Baltazar, Llanto, Tamayo. Isbn 978-621-02-2258-6. 2024. Pb. Central Books. 3 580.00 1,740.00 Vol Dispute Resolutions And Crises: Incident Management. Caño. Isbn 621-418-327-2. 2024. Wiseman’s Books 3 498.00 1,494.00 Vol Dogs In Philippine History By Ian Christopher Alfonso, The Philippine Historical Association 979-971-0546-70-1 56 1,500.00 84,000.00 Vol Don’t Take My Colors Away! Abc Educational Development Center 9789710492350 56 254.53 14,253.68 Vol Dystopia Manila/ John Luke Chica, [and Others]. Isbn 978-621-8232-72-3. 2022. Hs Grafik Print/paperkat Books 1 800.00 800.00 Vol Echo/ Kylie V. Milanes. Isbn 978-621-8232-78-5. 2022. Hs Grafik Print/paperkat Books 3 450.00 1,350.00 Vol Economics For Filipinos/ Dr. Bernardo Villegas And Mr. Louie Molina. Isbn 978- 971-07- 4542-5. 2020. Vibal Pub. 3 720.00 2,160.00 Vol El Árbol De La Alegria Isang Balangay Productions 978-621-96126-9-2 59 700.00 41,300.00 Vol Emerging Our God Within Ii/ Earnest L. Tan. Claretian Comm. Found. Inc 3 175.00 525.00 Vol Emotionally Healthy Discipleship/ Peter Scazzero. Isbn 9789710099160. 2022. Omf Lit. 3 350.00 1,050.00 Vol Emotionally Healthy Spirituality Updated/ Peter Scazzero. Isbn 9789710098217. 2018. Omf Lit. 3 350.00 1,050.00 Vol Emotionally Healthy Woman/geri Scazzero With Peter Scazzero. Isbn 9789710098620. 2019. Omf Lit 3 350.00 1,050.00 Vol Empowering The Retirees. Central Book Supply, Inc., Isbn 978-621-02-2281-4 Manahan Pb 2024 56 780.00 43,680.00 Vol Empowering The Retirees. Manahan. Isbn 978-621-02-2281-4. 2024. Pb. Central Books 3 780.00 2,340.00 Vol Encyclopedia Of Philippine Folk Beliefs And Customs Vol. 1/ Ed By Fr. Francisco Demetrio, S.j. 2023. Isbn 978-971-9094-34-0. Xavier Univ. Press 1 1,650.00 1,650.00 Vol Encyclopedia Of Philippine Folk Beliefs And Customs Vol. 2/ Ed By Fr. Francisco Demetrio, S.j. 2023. Isbn 978-971-9094-35-7. Xavier Univ. Press 1 1,650.00 1,650.00 Vol Engine Room Watch Keeping With Resource Management Laboratory Manual. Singuit. Isbn 621-418-355-5. 2024. Wiseman’s Books. 3 398.00 1,194.00 Vol English Plain & Simple-3rd Updated Ed/ Jose Carillo. Isbn ---. 2008. Manila Times. 2 699.00 1,398.00 Vol Enigmatic Objects: Notes Towards A History Of The Museum In The Philippines. Isbn 9786214482658. 2023. Admu Press By Golden Bookss. 3 1,950.00 5,850.00 Vol Entrepreneurial Management. Ybanez. Isbn 978-971-9655-47-3. 2024. Mindshapers Co., Inc. 3 345.00 1,035.00 Vol Entrepreneurial Mind. Isbn 978-971-07-4366-7. 2021. Vibal Pub. 3 750.00 2,250.00 Vol Environmental And Natural Resources Laws. Claridades. Isbn 978-621-02-1799-5. 2022. Hb. Central Books 3 1,860.00 5,580.00 Vol Environmental Disaster, Sanitation, And Waste Management / Ms. Analyn I. Diola, M.sc. Eduheart Book Publishing, 2024 978-621-8321-92-2 56 500.00 28,000.00 Vol Environmental Laws, Protection And Investigation/ R. Pecson, C. Chavez. Isbn 978-971-9647-62-1. 2023. Chapter House Pub. 3 398.00 1,194.00 Vol Epr: English Proficiency For Empowered Professionals. Santillana, Et Al. Isbn 978-621-409-235-2. 2023. Books Atbp. 3 300.00 900.00 Vol Ergonomics Facilities Planning For The Hospitality Industry. Buenaventura. Isbn 978-971-9655-66-4. 2023. Mindshapers Co., Inc. 3 450.00 1,350.00 Vol Essential Statutory Construction For Customs And Tax Practitioners. Nague. Isbn 978-621-02-2255-5. 2024. Pb. Central Books 3 980.00 2,940.00 Vol Essentials Of Purposive Communication. Caudilla. Books Atbp Publishing Corp. Isbn 978-621-409-207-9. 2023. 56 425.00 23,800.00 Vol Essentials Of Purposive Communication. Caudilla. Isbn 978-621-409-207-9. 2023. Books Atbp. 2 425.00 850.00 Vol Essentials Of Workplace-readiness Skills. Caudilla. Books Atbp Publishing Corp. Isbn 978-621-409-239-0. 2023. 56 425.00 23,800.00 Vol Essentials Of Workplace-readiness Skills. Caudilla. Isbn 978-621-409-239-0. 2023. Books Atbp. 2 425.00 850.00 Vol Even Ducks Get Liver Cancer/ Dr. Wilfredo Liangco. Isbn 9789718281215. 2022. Milflores Pub. 56 599.00 33,544.00 Vol Even Ducks Get Liver Cancer/ Dr. Wilfredo Liangco. Isbn 9789718281215. 2022. Milflores Pub. 2 599.00 1,198.00 Vol Every Sunday: A Story On Learning Sign Language /by Och Gonzalez, Illustrated By Cj Reynaldo/ St. Matthew's Publishing Corporation 2021 / 978-971-625-444-0 56 150.00 8,400.00 Vol Executive Protection Manual. Cleofas. Isbn 978-621-02-2435-1. Pb. 2024. Central Books 3 880.00 2,640.00 Vol Expositions On Labor Standards. Cacho. Isbn 978-621-02-2491-7. Hb. 2024. Central Books 3 1,980.00 5,940.00 Vol Facilitating Student-centered Teaching & Learning. Larioque, Et Al. Isbn 978-621-409-169-0. 2024. Books Atbp. 3 500.00 1,500.00 Vol Faith Driven Entrepreneur/ Henry Kaestner, J.d. Greear, And Chip Ingram. Isbn 9789710099382. 2022. Omf Lit. 3 350.00 1,050.00 Vol False Nostalgia: The Marcos “golden Age” Myths And How To Debunk Them. Isbn 9786214482467. 2023.admu Press By Golden Books. 3 1,650.00 4,950.00 Vol February Rain. Mendoza, Amadeo. Isbn. 2023. Balangay Books. 3 800.00 2,400.00 Vol Feeding The Hungry Ghost Adarna House 978-971-508-982-1 56 150.00 8,400.00 Vol Fifty Years Of Philippine Independence: Stories From A Half Century. De Viana. Isbn 978-621-409-249-9. 2024. Books Atbp. 3 2,800.00 8,400.00 Vol Filipino Vegan / Astig Vegan Anvil Publishing, 2022 9712737442 56 350.00 19,600.00 Vol Financial Management/ Jovelyn Q. Yu, Stevenson Q. Yu. Isbn 978-621-04-5086-6. 2024. Rex Bookstore. 3 605.00 1,815.00 Vol Fire Officer Examination - (foe) Reviewer 2nd Edition. Medina. Isbn 621-418-352-4. Wiseman’s Books. 3 498.00 1,494.00 Vol Firefly Augie Rivera. Paperkat Books Isbn 978-621-487-014-1 2024 56 399.00 22,344.00 Vol First Aid, Rescue And Water Safety. Dogui-is. Wiseman's Books Trading, Inc. Isbn 621-418-297-8. 2023. 59 398.00 23,482.00 Vol Flowers For Thursday: Stories (2nd Edition)/ Mia Tijam. Isbn 9786214720484 . 2024. Ateneo De Naga Univ. Press 3 480.00 1,440.00 Vol Food Security And Laws Against Agricultural And Food Smuggling. Montemayor. Isbn 978-621-02-2152-7. 2023. Cb. Central Books 3 880.00 2,640.00 Vol Forensic Examination Of Questioned Documents/ Pltcol Mg Alvarez. 5th Ed. Isbn 978-621-488-012-6 2024. Chapter House Pub. 3 488.00 1,464.00 Vol Forever Grateful/ Rosalinda Macinas. Isbn 9789717893389. Christian Literature Crusade 2 125.00 250.00 Vol Forth. Tuazon, Rosmon. Isbn 978-621-96126-5-4. 2021. Balangay Books. 3 400.00 1,200.00 Vol From The Womb To The Tomb/ Aida B. Sambat. Isbn ---. Claretian Comm. Found. Inc 3 165.00 495.00 Vol Front Office Systems And Procedures. Lago. Isbn 978-971-9655-73-2. 2024. Mindshapers Co., Inc. 3 475.00 1,425.00 Vol Fundamentals Of Criminal Investigation And Intelligence2nd Ed. / E Labata, B. Paca, D. Torino. Isbn 978-621-488-003-1. 2025. Chapter House Pub. 2 588.00 1,176.00 Vol Fundamentals Of Food Service In Operation. R. Dela Cruz. Isbn 978-971-9655-04-6. 2022. Mindshapers Co., Inc. 3 375.00 1,125.00 Vol Fundamentals Of Industrial Security Management. Cleofas, Estillero, Demelletes Isbn 978-621-02-2445-0. Pb. 2024. Central Books 3 680.00 2,040.00 Vol G! Devotional Para Sa Mga Ganap Natin Sa Buhay/ Various Contributors. Isbn 9789710099191. 2022. Omf Lit. 3 250.00 750.00 Vol Gabay Ng Barangay Sa Mediation, Conciliation, And Arbitration. Atty. Irene De Torres Alogoc. Isbn 978-621-04-5087-3. 2023. 2023. Clothbound. Rex Bookstore 3 1,150.00 3,450.00 Vol Gawad Ccp Para Sa Sining 2020. 2021. Isbn 978-971-8546-92-5. Ccp. 3 570.00 1,710.00 Vol Gender And Society With Peace Education Towards An Inclusive Higher Education Perspective. Espinol, Et Al. Isbn 978-621-409-230-7. 2023. Books Atbp. 3 375.00 1,125.00 Vol Gera. Arguelles, Mesandel. Isbn 9789719699132. 2014. Balangay Books. 3 500.00 1,500.00 Vol Ghazal Ni Pramoedya Ananta Toer/ R.b. Abiva. Isbn 978-621-96798-2-4. 2023. Sadiri Publishing. 3 150.00 450.00 Vol Gimo Jr. And The Aswang Clan. Andrew J. Pasaporte. Isbn:978-621-06-1044-4. 2023. Pb. Central Books 3 500.00 1,500.00 Vol Go Out To Seek Hearts/ Jorge Mario Bergoglio. Isbn ----------. Claretian Comm. Found. Inc 1 135.00 135.00 Vol Gochiso Sarap/ Reggie Aspiras, Daisuke Suzuki. Isbn 9712737923. 2023. Anvil Pub. 3 488.00 1,464.00 Vol God Made You Good/ Bo Sanchez. Isbn 9789710072699. 2023. Shepherds Voice Pub. 3 450.00 1,350.00 Vol God's Blue Print/ Eddie O Labios Jr. Isbn 9789717893471. Christian Literature Crusade 3 300.00 900.00 Vol Golden Kumquats In Trieste And Other Travel Tales/ Alice M. Sun-cua. Isbn 978-971-991-367-2. 2018. Ateneo De Naga Univ. Press 3 450.00 1,350.00 Vol Good Morning Lord... Can We Talk?/ Paul David Tripp. Isbn 9789710098422. 2022. Omf Lit 3 365.00 1,095.00 Vol Good To Great In God's Eyes: 10 Practices Great/ Chip Ingram. Isbn 9789710099405. 2022. Omf Lit 3 495.00 1,485.00 Vol Gospel Germs God’s Word Made Simple/ Abraham De La Torre. Isbn ----. Claretian Comm. Found. Inc 3 415.00 1,245.00 Vol Governing Rules For Pardon, Parole, Probation And Criminal Code 2023. Montemayor. Isbn 978-621-02-2137-4. 2023. Hb. Central Books 3 1,980.00 5,940.00 Vol Government Service Insurance System (gsis) And Related Laws. Montemayor. Isbn 978-621-02-2121-3. 2023. Hb. Central Books 3 1,580.00 4,740.00 Vol Governor Of The Cordillera: John C. Early Among The Philippine Highlanders. Isbn 9786214483105. 2023. Admu Press By Golden Books. 3 750.00 2,250.00 Vol Greatness Of Spirit Book Series. Isbn-13: 978-621-96687-1-2 (1 Set, 7 Vols), Ramon Magsaysay Award Found. 7 9,285.75 65,000.25 Vol Guidebook For Subdivision And Condominium Buyers And Real Estate Practitioners. Claridades. Isbn 978-621-02-2507-5.hb. 2024. Central Books 3 1,250.00 3,750.00 Vol Guidelines And Procedures In Land Titles And Deeds. Mogello. Isbn 978-621-02-2446-7. Hb. 2024. Central Books 3 1,680.00 5,040.00 Vol Guidelines For Living/ Harold J. Sala. Isbn 9789710098026. 2018. Omf Lit 3 395.00 1,185.00 Vol Guidelines On End Of Life Issues / Fr. James Mctavish. Isbn ----------. Claretian Comm. Found. Inc 1 75.00 75.00 Vol Guilt-free Cooking: The Maya Kitchen. Isbn : 9789712735844. 2020. Anvil Pub. 2 295.00 590.00 Vol Habol: Hubog At Hulagway. Celestial, Miguel Paolo (editor). Isbn 9786219678162. 2023. Balangay Books. 3 450.00 1,350.00 Vol Hajimemashou Learn Basic Japanese. Rea-dafun, M. Isbn 978-971-9655-02-2. 2022. Mindshapers Co., Inc. 3 385.00 1,155.00 Vol Halagahan Mga Teksto Ng Pagturing/ Patrick Flores. Isbn 9786214720057. 2021. Ateneo De Naga Univ. Press 1 400.00 400.00 Vol Handbook For Practicing Lawyers And Bar Reviewees. Magadia. Isbn 978-621-02-2243-2. 2024. Hb. Central Books 3 1,120.00 3,360.00 Vol Handbook In Juvenile Delinquency And Violence Against Women And Their Children. Barican /dausan/ Abordo. Isbn 621-418-353-1. 2024. Wiseman’s Books 3 498.00 1,494.00 Vol Handbook On The Code Of Professional Responsibility And Accountability (cpra). Wong. Isbn 978-621-02-2396-5.hb. 2024. Central Books 3 1,550.00 4,650.00 Vol Hate Eating Birds/ Denver Ejem Torres. 2018. Isbn 978-971-9094-25-8. Xavier Univ. Press 3 300.00 900.00 Vol Heart Chained: A Love They Could Never Outrun / Shirley Siaton. Isbn 978-621-8371-12-5 2024. Inky Sword Book Pub. 1 450.00 450.00 Vol Heart Sense: Your Guide To Emotional Wellness/ Earnest L. Tan. Claretian Comm. Found. Inc 1 250.00 250.00 Vol Heartbreaks And Breakthroughs/ Bettinna Carlos. Isbn 9789710098590. 2019. Omf Lit. 2 250.00 500.00 Vol Heartbreakthrough 8 Steps To Rise Above Heartbreak - The Lord’s Way/ Meanne Mabisa Mijares. Claretian Comm. Found. Inc 1 199.00 199.00 Vol Heartland (rio Alma's 'muli, Sa Kandungan Ng Lupa)/ Marne L. Kilates,translator. Isbn 978-971-991-340-5. 2015. Ateneo De Naga Univ. Press 3 900.00 2,700.00 Vol Her Last Cigarette Yesterday/ Allene Allanigue. Isbn 978-621-487-009-7. 2023. Hs Grafik Print/paperkat Books 3 500.00 1,500.00 Vol Heritage Dishes Of The Philippines Lady Camille L. De Guia Vibal Group, Inc. 978-971-07-5666-7 2023 56 440.00 24,640.00 Vol Himig Himbing: Mga Heleng Atin (a Collection Of Cradle Songs From The Philippines). Isbn ----. Ccp 3 400.00 1,200.00 Vol Hiraya/ Binibining Mia. Isbn 9712738203. 2024. Anvil Pub. 3 249.00 747.00 Vol History Of Mathematics/ John Mark Flores Bondoc, Jhon Carlo Santiago Villa. Isbn 978-621-04-5060-6. 2024. Rex Bookstore. 3 335.00 1,005.00 Vol Holy, Mother, Virgin, Helper, Queen: A Symbolical, Theological, Historical And Devotional Look Into The Litany Of The Blessed Virgin Mary Of Loreto / Gerard Francisco Timoner. Isbn -----. Claretian Comm. Found. Inc 3 800.00 2,400.00 Vol Hoy, Pong! Macky Cruz 19th Avenida Publishing House 978-6218264-20-5 2023 56 504.50 28,252.00 Vol Human Behavior And Victimology 4th Ed. / R. Castillo, Jr., R. Gabao. Isbn 978-971-9647-99-7 2023. Chapter House Pub. 3 448.00 1,344.00 Vol Human Behavior And Victimology. Depayso. Isbn 621-418-359-3. 2024. Wiseman’s Books 3 498.00 1,494.00 Vol Human Development - Understanding Criminal Behavior And Victimology. Togana. Isbn 621-418-348-7. 2024. Wiseman’s Books 3 398.00 1,194.00 Vol Human Resource Management Revised Edition / Dr. Margie Dg Dela Cruz 2024. Eduheart Book Publishing, 978-621-493-047-0 56 850.00 47,600.00 Vol Human Rights Education - Building A Universal Culture Of Human Rights. Tulalian. Isbn 621-418-370-8. 2024. Wiseman’s Books 3 450.00 1,350.00 Vol I Have Learned From The Least: My Life, Hopes/ Cardinal Luis Antonio Tagle. Isbn ----. Claretian Comm. Found. Inc 2 165.00 330.00 Vol I Love Tnalak Abc Educational Development Center 9789710492565 56 250.00 14,000.00 Vol Indak Ta[y]o: Dances Of The Philippine Islands 3 500.00 1,500.00 Vol Institutional Correction For Criminology Students. Villaluz. Isbn 621-418-341-8 . 2024. Wiseman’s Books 3 350.00 1,050.00 Vol Institutional Corrections 3rd Ed. / J/supt W. Plopinio, (ret.), Da Barreda. Isbn 978-971-9647-85-0. 2023. Chapter House Pub. 2 428.00 856.00 Vol Insurance Supervision In The Philippines. Funa. 2024. Set (vols. 1-3). Hb. Central Books 3 2,960.00 8,880.00 Vol Intellectual Property Rights The Practice. Manahan. Isbn 978-621-02-2370-5. 2024. Hb. Central Books. 3 1,580.00 4,740.00 Vol Interculturated Christ In China/ Fang Hua. Isbn ---- Claretian Comm. Found. Inc 3 295.00 885.00 Vol Intermediate Accounting Essentials Volume 1/ Pauline Kristine M. Fulgencio, Jackqui R. Moreno. Isbn 978-621-04-5165-8. 2024. Rex Bookstore. 3 585.00 1,755.00 Vol Intermediate Accounting Essentials Volume 2/ Pauline Kristine M. Fulgencio, Jackqui R. Moreno, Albert I. Rivera. Isbn 978-621-04-5164-1. 2024. Rex Bookstore. 3 560.00 1,680.00 Vol Intermediate Accounting Essentials Volume 3/ Pauline Kristine M. Fulgencio, Jackqui R. Moreno, Albert I. Rivera. Isbn 978-621-04-5163-4. 2024. Rex Bookstore. 3 540.00 1,620.00 Vol International Human Rights Law And Human Rights Law In The Philippines. Alejandrino. Isbn 978-621-02-2148-0. 2023. Hb. Central Books 3 980.00 2,940.00 Vol Interregnum: Maiikling Kwento/ Mixkaela Villalon. Isbn___. 2021. Gantala Press. 3 250.00 750.00 Vol Into The Sea Of Mercy/ Samuel H. Camilang. Isbn ----- 2017. Claretian Comm. Found. Inc. 1 395.00 395.00 Vol Intramuros: The Story Of Old Manila/ Jose Victor Z. Torres. Isbn 978-971-97-0851-3. 2023. Vibal Pub. 2 440.00 880.00 Vol Introduction To Consumer Behavior. Pasahol. Isbn 978-971-9655-90-9. 2024. Mindshapers Co., Inc. 3 425.00 1,275.00 Vol Introduction To Criminology - A Guidebook For Criminology Instructors And Students. Caballero/ Barican. Isbn 621-418-339-5. 2024. Wiseman’s Books 3 498.00 1,494.00 Vol Introduction To Criminology. Magtaan/ Cabrillas. Isbn 621-418-335-7. 2024. Wiseman’s Books 2 350.00 700.00 Vol Introduction To Cruise Line. Laxa. Isbn 978-971-9905-82-0. 2021. Mindshapers Co., Inc. 3 365.00 1,095.00 Vol Introduction To Culinary Arts. Lago. Isbn 978-621-406-323-9. 2022. Mindshapers Co., Inc. 3 545.00 1,635.00 Vol Introduction To Cybercrime & Basic Digital Investigative Analysis. D Lagumen; H. Lagumen. 3rd Ed. Isbn 978-621-488-014-0. 2024. Chapter House Pub. 3 548.00 1,644.00 Vol Introduction To Cybercrime And Environmental Laws. Tad-awan. Isbn 621-418-360-9. 2024. Wiseman’s Books 2 398.00 796.00 Vol Introduction To Cybercrime Investigation And Environmental Laws And Protection/ A. Detran, M. Besas, M. Patalinghug,j. Pensotes. Isbn 978-621-488-006-5. 2024. Chapter House Pub. 3 588.00 1,764.00 Vol Introduction To Human Computer Interaction. Revano, Laviña. Isbn 978-971-9655-05-3. 2023. Mindshapers Co., Inc. 3 475.00 1,425.00 Vol Introduction To Industrial Security Concepts 4th Ed./ D. Bobier. Isbn 978-621-48-015-7. 2024. Chapter House Pub. 3 498.00 1,494.00 Vol Introduction To Industrial Security Concepts. Depayso. Isbn 621-418-338-8. 2024. Wiseman’s Books 1 450.00 450.00 Vol Introduction To Java Programming (3rd Ed) Pomperada. Isbn 978-971-9655-72-5. 2024. Mindshapers Co., Inc. 3 545.00 1,635.00 Vol Introduction To Philippine Government & Politics With Basic Constitutional Provisions. Baes, Belter. Isbn 978-971-9655-81-7. 2024. 3 425.00 1,275.00 Vol Introduction To Qualitative Research Writing: Handbook-worktext For Practical Research 1. Casinto, C.d. Isbn 9786214460175. 2023. Great Books Trading 3 350.00 1,050.00 Vol Introduction To The Forensic Sciences. Taduran. Isbn 621-418-346-3. 2024. Wiseman’s Books 2 598.00 1,196.00 Vol Islamic Law Dictionary/ Ed By Haron A Pangcoga. 2022. Isbn 978-971-9094-36-4. Xavier Univ. Press 1 575.00 575.00 Vol It Is Time To Come Home/ Marjorie Evasco. Isbn 9789718281390. 2023. Milflores Pub. 3 1,499.00 4,497.00 Vol It’s A Men’s World Isang Balangay Productions 978-621-96781-4-8 56 700.00 39,200.00 Vol Jokes Only: A Book On Duterteisms/ Maslog, Crispin. Isbn: --- 2021. New Day Pub. 3 200.00 600.00 Vol Joy To Give Buhay Katiwala At Ang Simbahan Ng Mga Dukha Stewardship As A Way Of Life And The Church Of The Poor/ Mila Garcia Glodava. Isbn -----. Claretian Comm. Found. Inc. 3 995.00 2,985.00 Vol Joyful Light/ Various Contributors. Isbn 9789710098385. 2019. Omf Lit. 2 225.00 450.00 Vol Junior Ipon: Ang Inyong Gabay Sa Mas Matalinong Paggamit Ng Pera / By Mark Kevin J. De Guia / St. Matthew's Publishing Corporation / 2016 / 978-971-625-341- 2 56 220.00 12,320.00 Vol Jurisprudence On Legitimate Job Contracting (philippine Laws & Decisions) Vol. I. (ret.) Usec. Josephus B. Jimenez, Atty. John Paul S. Jimenez. Isbn 978-621-04-5156-6. Clothbound With Jacket. 2023. Rex Bookstore 3 2,200.00 6,600.00 Vol Juvenile Delinquency & Juvenile Justice System/ Gerry J. Caño, Roan Salon. Isbn 978-621-04-5077-4. 2024. Rex Bookstore. 3 410.00 1,230.00 Vol Juvenile Delinquency And Juvenile Justice System. 2nd Ed/ A. Detran, B. Literal. Isbn 978-621-488-016-4. 2024. Chapter House Pub. 2 468.00 936.00 Vol K-drama Cookbook/ Reggie Aspiras, Lily Min. Isbn 9789712735998. 2020. Anvil Pub. 2 488.00 976.00 Vol Kapag Sumalupa Ang Gunita: Journal Entries Ni Rogelio Sicat/ Luna Sicat, Editor. Isbn 978-971-991-366-5. 2018. Ateneo De Naga Univ. Press 3 400.00 1,200.00 Vol Kastoyda Idiay…: Travelogue Ti Maysa Nga Ilokano Idiay Abroad/ Vicente P. Palcong. Isbn 978-621-96798-5-5. 2023. Sadiri Publishing. 3 400.00 1,200.00 Vol Katarungang Pambarangay. Central Book Supply, Inc., Isbn 978-621-02-2425-9 Claridades Pb 2024 56 880.00 49,280.00 Vol Kaya Ko Pa Bes!/ Various Contributors. Isbn 9789710098576. 2019. Omf Lit. 2 225.00 450.00 Vol Kembang Kertas: Mga Binalaybay / Mga Tula. Isbn 9786214482955. 2023.admu Press By Golden Books. 3 1,200.00 3,600.00 Vol Kitchen Essentials And Basic Food Preparation. Remaneses, Et Al. Isbn 978-621-409-225-3. 2023. Books Atbp. 3 550.00 1,650.00 Vol Komprehensibong Gabay Sa Pamamahala Ng Barangay. Central Book Supply, Inc., Isbn 978-621-02-2269-2 Claridades Pb 2023 56 950.00 53,200.00 Vol Komprehensibong Gabay Sa Pamamahala Ng Barangay. Claridades. Isbn 978-621-02-2269-2. 2024. Pb. Central Books. 3 950.00 2,850.00 Vol Kun Nata Mayong Demonyo Sa Malabog=kung Bakit Walang Demonyo Sa Malabog=why The Devils Does Visit Malabog Anymore/ Abdon M. Balde Jr. Isbn 978-621-472-028-6. 2022. Ateneo De Naga Univ. Press 3 500.00 1,500.00 Vol Kun Sana Si Shakes Taga Sato William Shakespeare/ Gode B. Calleja. Isbn 978-971-991-368-9. 2018. Ateneo De Naga Univ. Press 3 450.00 1,350.00 Vol Kwentong Mang Beto/aeron Teves. Isbn 978-621-487-032-5 (paperback). 2024. Hs Grafik Print/paperkat Books 3 550.00 1,650.00 Vol Labor Relations And Negotiations/ Cecilio Duka. Isbn 978-621-04-5049-1. 2024. Rex Bookstore. 3 230.00 690.00 Vol Lakbayin Ang Sining: Readings In Creative And Cultural Work In The Philippines. 2020. Isbn 978-971-8546-85-7. Ccp. 3 700.00 2,100.00 Vol Lampin Para Kay Quintin / Gatmaitan, Luis P. -- Quezon City : Lampara Publishing House, Inc., 2024. 56 199.75 11,186.00 Vol Lasang Sa Mga Pasumbingay: Sixteen Southern Writers/ Ed By Merlie M Alunan. 2023. Isbn 978-971-9094-37-1. Xavier Univ. Press 3 1,000.00 3,000.00 Vol Law Enforcement Operations And Planning With Crime Mapping 3rd Ed/. B. Salamanca, M. Santos, R. Tabajonda. Isbn 978-621-488-031-7. 2025. Chapter House Pub. 2 468.00 936.00 Vol Law Enforcement Operations And Planning With Crime Mapping. Tancangco. Isbn 621-418-257-2. 2024. Wiseman’s Books 3 398.00 1,194.00 Vol Law Enforcement Organization And Administration. 2nd Ed./ A. Detran, M. Besas, J. Pensotes. Isbn 972-621-488-030-0. 2025. Chapter House Pub. 2 488.00 976.00 Vol Law Enforcement Organization And Administration. Payay, Matchok, Dee, Eusebio. Isbn 978-621-02-2341-5. 2024. Pb. Central Books. 3 650.00 1,950.00 Vol Law On Property And Essentials Of Land Registration. Atty. Eduardo T. Reyes Iii. Isbn 978-621-04-5088-0. 2023. Pb. Rex Bookstore 3 1,500.00 4,500.00 Vol Laws On Adoption. Montemayor. Isbn 978-621-02-2173-2. 2024. Hb. Central Books 3 1,680.00 5,040.00 Vol Leadership Excellence / Francis Kong. Isbn 9712738661. 2024. Anvil Pub. 1 350.00 350.00 Vol Leadership Excellence Anvil Publishing, 2024 9712738661 56 350.00 19,600.00 Vol Learn And Enjoy Intermediate Statistics The Easy Way - Advanced Volume 2 Revised Edition. Uriarte. Isbn 621-418-344-9. 2024.wiseman’s Books 3 398.00 1,194.00 Vol Learn And Enjoy Statistics The Easy Way - Basic Volume 1 Revised Edition. Uriarte. Isbn 621-418-343-2. 2024. Wiseman’s Books 3 350.00 1,050.00 Vol Learners With Emotional Behavioral, Language, And Communication Disabilities/ Cristina Rowena Salcedo-padilla, Greg Tabios Pawilen. Isbn 978-621-04-5044-6. 2024. Rex Bookstore. 3 475.00 1,425.00 Vol Learning Research The Easy Way (revised Edition). Uriarte. Isbn 621-418-342-5. 2024. Wiseman’s Books 3 598.00 1,794.00 Vol Learning Research The Easy Way (revised Edition). Uriarte. Wiseman's Books Trading, Inc. Isbn 621-418-342-5. 2024. 56 598.00 33,488.00 Vol Learnings: A Collection Of Essays/ Greg S. Castilla. Isbn 978-971-9913-41-2. 2015. Ateneo De Naga Univ. Press 3 500.00 1,500.00 Vol Legal Aspects In Tourism & Hospitality (the Philippine Tourism Laws Simplified). Atty. T. Cagurangan. Isbn 978-621-406-298-0. 2022. Mindshapers Co., Inc. 2 375.00 750.00 Vol Legal Handbook Daily Law Companion For All/ Wong. Isbn 978-621-02-2394-1. Hb.2024. Central Books. 3 1,980.00 5,940.00 Vol Leisure And Recreation Management For Tourism And Hospitality Industry. Cornell. Isbn 978-971-9655-65-7. 2023. Mindshapers Co., Inc. 3 500.00 1,500.00 Vol Living With Nature In Our Home And Community/ Abercio V. Rotor. Isbn 978-621-8389-05-2. 2023. Sadiri Publishing. 3 500.00 1,500.00 Vol Living Word On Breathing Earth/ Foreword By Fr. Francis J. Moloney. Isbn ---- Claretian Comm. Found. Inc. 3 175.00 525.00 Vol Loaves Of Blessings/ Msgr. Manuel Gabriel Garcia. Isbn 9712737954. 2023. Anvil Pub. 3 125.00 375.00 Vol Lol: Law Of Laughter. Claridades. Isbn 978-621-02-2213-5. 2023. Hb. Central Books. 3 850.00 2,550.00 Vol Looking Back 17: History In Lockdown / Ambeth Ocampo. Isbn 9712738753. 2024. Anvil Pub. 2 175.00 350.00 Vol Looking Back 17: History In Lockdown Anvil Publishing, 2024 9712738753 56 180.00 10,080.00 Vol Looking For The Prehispanic Filipino/ Scott, William. Isbn 9789711005247. 2023. New Day Pub. 3 395.00 1,185.00 Vol Lord, I'm Depressed/ Rico Villanueva. Isbn 9789710098644. 2019. Omf Lit. 3 150.00 450.00 Vol Love In Style. Volume 1/ Allene Allanigue [and Six Others]. Isbn 978-621-8232-87-7. 2022. Hs Grafik Print/paperkat Books 1 400.00 400.00 Vol Love In Style. Volume 2/ Kadi Serafica, [and Six Others]. Isbn 978-621-8232-90-7. 2022. Hs Grafik Print/paperkat Books 1 400.00 400.00 Vol Love Remains In Empty Spaces Reflection On Grief And Finding Meaning In Loss In Times Of Covid-19/ Marites Guingona-africa. Isbn ___ 2022. Claretian Comm. Found. Inc. 1 525.00 525.00 Vol Lovestruck Sana All/ Ronald Molmisa. Isbn 9789710099030. 2021. Omf Lit. 3 125.00 375.00 Vol Lubog Sa Ulap/ Emmanuel Quintos Velasco. Isbn 9786218230309. 2024. Domercura Enterprises 3 990.00 2,970.00 Vol Lumbay Ng Dila. Asenjo, Genevieve. Isbn 978-971-9699-24-8. 2020. Balangay Books. 1 1,000.00 1,000.00 Vol Lutong Gipit: Mga Recipe Sa Panahon Ng Krisis/ Amihan National Federation Of Peasant Women. Isbn ___. 2021. Gantala Press. 3 200.00 600.00 Vol Lying In State. 2018. Ccp 3 200.00 600.00 Vol Mabuting Magulang Pag-asa Ka Ng Bagong Kabataan! Parenting Guide That Promotes Child’s Rights And Wellness / Alexander Del Rosario. Isbn ------. Claretian Comm. Found. Inc. 3 275.00 825.00 Vol Made Of Saltwater. Prudenciado, James. Isbn 978-621-96126-7-8. 2022. Balangay Books. 3 500.00 1,500.00 Vol Magna Carta For Seafarers. Montemayor. Isbn 978-621-02-2264-7. 2024. Pb. Central Books 3 920.00 2,760.00 Vol Makisawsaw: Recipes X Ideas - Community Gardens Edition/ Karla Rey, Carissa Pobre, And Joyce Santos. Isbn 978-621-96513-2-5. 2021. Gantala Press. 3 420.00 1,260.00 Vol Mama Mary And Her Children (book 8)/ Ma. Rowena Juan Matti, Lesley Dawn Cabal, Ann Marie Wongchuking Pato. Isbn : 9789712738074. 2023. Anvil Pub. 3 295.00 885.00 Vol Managing Alternative Learning System In Philippine Context. Valverde, O.t. Isbn 9786214460045. 2022. Great Books Trading 3 495.00 1,485.00 Vol Manen, Adda Umuna/ Ariel Sotelo Tabag. Isbn 978-621-96798-0-0. 2023. Sadiri Publishing. 3 350.00 1,050.00 Vol Mang Andoy's Signs 978-971-630-182-3 Tahanan Books For Young Readers, 2015 56 220.00 12,320.00 Vol Mangled Mornings: Collected Poems/ Aida F. Santos. Isbn 978-621-95663-8-4. 2019. Gantala Press. 3 340.00 1,020.00 Vol Maqueda: Mga Usipon Mula Lawod Hanggang Baybayon Isang Balangay Productions 978-971-9699-23-1 59 700.00 41,300.00 Vol Marginality In Christian Mission In The 20th Century/ Ngaya-an, Ben. Isbn 9789711013660. 2019. New Day Pub. 2 600.00 1,200.00 Vol Marka Demonyo Or Poems On Love, Faith, And Duct Tape. 2024. Isbn 9712738272. Anvil Pub. 2 199.00 398.00 Vol Marketing Management/ Baniline Jone V. Abantao. Isbn 978-621-04-5037-8. 2024. Rex Bookstore. 3 450.00 1,350.00 Vol Martial Law Melodrama: Lino Brocka’s Cinema Politics. Isbn 9786214482948. 2023. Admu Press By Golden Books. 3 1,750.00 5,250.00 Vol Martín De Rada 1533–1578 (english Version) Isbn 978-971-97-0805-6 (softbound). Vibal Pub. 3 880.00 2,640.00 Vol Marunggay Ken Dadduma Pay A Sarita/ Rolando D. Agatep Jr. Isbn 978-621-96798-1-7. 2023. Sadiri Publishing. 3 400.00 1,200.00 Vol Mastering Modern Supply Chains For Tourism And Hospitality Industry. Maranan Et Al. Isbn 978-971-9655-87-9. 2024. Mindshapers Co., Inc. 3 400.00 1,200.00 Vol Matandang-matandang Buto: Ang Homo Luzonensis Sa Filipinas Adarna House 978-971-508-940-1 56 150.00 8,400.00 Vol Mathematics Of The Modern World (revised Edition). Sirug. Isbn 978-971-9655-220. 2023. Mindshapers Co., Inc. 3 600.00 1,800.00 Vol Matters Of The Heart / Fr. James Mctavish. Isbn --- Claretian Comm. Found. Inc. 3 225.00 675.00 Vol May Di Mawaglit Na Awit/ Michael Coroza. Isbn 9789719913986a. 2021. Ateneo De Naga Univ. Press 1 350.00 350.00 Vol May Isang Batang Lumiliit / Gojo Cruz, Genaro R. -- Quezon City : Lampara Publishing House, Inc., 2024. 56 199.75 11,186.00 Vol Mcmlxxii (1872-1972) 500 Years Roman Catholic (volume Two) / Jose Mario Bautista Maximiano. Isbn ---. Claretian Comm. Found. Inc. 3 350.00 1,050.00 Vol Meaning And History: New Edition Anvil Publishing, 2024 9712738647 56 210.00 11,760.00 Vol Meaning And History: The Rizal Lectures (new Edition) / Ambeth Ocampo. Isbn 9712738647. 2024. Anvil Pub. 3 195.00 585.00 Vol Medical Education In The Philippines. Montemayor. Isbn 978-621-02-2066-7. 2023. Cb. Central Books. 3 1,580.00 4,740.00 Vol Memories Of Grace/ Grace D. Chong. Isbn 9789710098873. 2020. Omf Lit. 3 250.00 750.00 Vol Memory & Freedom/ Alma Anonas-carpio.isbn 9786218230279. 2023. Domercura Enterprises 1 585.00 585.00 Vol Mental Health Deep Savers/ Rev. Philip Henry B. Morales. Isbn 978-621-96892-3-6. 2024. Lolakwentosera Book Pub. 3 349.00 1,047.00 Vol Mga Buhay Na Apoy (breath Of Fire) / Kanakan-balintagos. Isbn Isbn 978-621-96301-7-7. 2023. Pawikan Press 3 600.00 1,800.00 Vol Mga Ehersisyo Espiritwal Sa Tataramon Na Bikol (1872)/ Fr. Wilmer Tria, Editor, Isbn 978-971-991-342-9. 2015. Ateneo De Naga Univ. Press 3 600.00 1,800.00 Vol Mga Mahinungdanong Pangutana Ug Tubag/emilio A Ballesteros Jr. Isbn 9789717892788. Christian Literature Crusade 2 295.00 590.00 Vol Mga Papel Ni Benengeli/ Various Authors. Isbn 9789718281352. 2023. Milflores Pub. 2 500.00 1,000.00 Vol Mga Pormularyong Legal Sa Wikang Filipino/ Claridades. Isbn 978-621-02-2208-1. 2023. Cb. Central Books. 3 950.00 2,850.00 Vol Mga Sinaunang Hayop Sa Filipinas Adarna House 978-971-508-941-8 56 150.00 8,400.00 Vol Mga Sulat Na Para Sana Sa 'yo/ Vanessa Cruz-zapanta. Isbn 978-621-96272-7-6. 2021. Hs Grafik Print/paperkat Books 1 500.00 500.00 Vol Mga Tula Ni Sta. Teresa De Jesus / Salin Ni Emmanuel C. Marfori. Isbn ----. Claretian Comm. Found. Inc. 3 405.00 1,215.00 Vol Mi Vida: The Selected Journals Of Fe Del Rosario Maggay/ Fe Del Rosario Maggay. Isbn 978-621-472-0026. 2021. Ateneo De Naga Univ. Press 3 650.00 1,950.00 Vol Microeconomics Numerical And Computational Approach. Paurom. Isbn 978-971-9655-82-4. 2024. Mindshapers Co., Inc. 3 325.00 975.00 Vol Mining Act Of The Philippines/ Montemayor. Isbn 978-621-02-2048-3. 2023. Cb. Central Books. 3 1,180.00 3,540.00 Vol Moral Philosophy And Ethics. Bacuyag. Isbn 621-418-313-5. 2024. Wiseman’s Books 3 398.00 1,194.00 Vol More Precious Than Gold Expanded Edition/ Dave Caesar F. Dela Cruz. Claretian Comm. Found. Inc. 1 140.00 140.00 Vol More Than Enough/ Mel Caparros. Isbn 9789710098729. 2020. Omf Lit. 2 350.00 700.00 Vol Moving With Moonrise: Haibuns. Isbn 9786214483112. 2023. Admu Press By Golden Books. 3 750.00 2,250.00 Vol Musings Christian Reflection On Life’s Ambiguities/ Nil Guillemette. Claretian Comm. Found. Inc. 1 265.00 265.00 Vol Mutual Defense Treaty. Montemayor. Isbn 978-621-02-1133-7. Hb. 2024. Central Books. 3 1,380.00 4,140.00 Vol My Mother Is More Than A Comfort Woman/ The Mothers' Storybook Project Team, Naoko Okimoto. Isbn ___. 2021. Gantala Press. 3 350.00 1,050.00 Vol My Ranaw Kitchen Lab Food For Peace In Muslim Mindanao/ Assad Baunto. Isbn 978-621-96301-6-0. 2022. Pawikan Press. 1 350.00 350.00 Vol National Security And The Philippine Defense Economy. Gatdula. Isbn 978-621-02-2382-8. 2024. Hb. Central Books. 3 950.00 2,850.00 Vol Necessary And Sufficient/ Dennis K. Legaspi. Isbn 9789710098866. 2020. Omf Lit. 3 375.00 1,125.00 Vol Never You & I: Poetry On Love Come Undone / Shirley Siaton. Isbn 978-621-490-088-6. 2024. Inky Sword Book Pub. 3 480.00 1,440.00 Vol Non-corporate Media Of Doing Business: Agency & Trusts Partnerships & Joint Ventures. Dean Cesar L. Villanueva, Atty. Teresa S. Villanueva-tiansay. Isbn 978-621-04-4819-1. 2023. Clothbound. Rex Bookstore 2 2,100.00 4,200.00 Vol Non-institutional Corrections. 3rd Ed. C. Beit-chavez /m. Fetalvo-balares, R. Tamayo. Isbn 978-621-488-013-3. 2024. Chapter House Pub. 2 448.00 896.00 Vol Nun-talk: Selected Speeches And Articles/ Sr. Mary John Mananzan. Isbn ---- Claretian Comm. Found. Inc. 3 575.00 1,725.00 Vol Obligations And Contracts Notes And Jurisprudence. Albano. Isbn 978-621-02-2310-1. 2024. Hb. Central Books. 3 1,550.00 4,650.00 Vol Occupation 1942-1945. Isbn 978-971-97-0687-8 (hardbound). Vibal Pub. 3 600.00 1,800.00 Vol Oha: A Story Told In One Eternal Second/ Krie R. Lopez. Isbn 9789718281376. 2024. Milflores Pub. 2 499.00 998.00 Vol Old Manila. Isbn 978-971-97-0696-0 (hardbound). Vibal Pub. 3 2,750.00 8,250.00 Vol One Covenant Three Evangelical Counsels/ Jose Cristo Rey Garcia Paredes. Isbn------ Claretian Comm. Found. Inc. 1 300.00 300.00 Vol One Day At A Time: The Secret To Making Each Moment Count/ Francis Kong. Isbn 9789712736292. 2021. Anvil Pub. 2 350.00 700.00 Vol Opas Ken Dadduma Pay A Sarita/ Daniel L. Nesperos. Isbn 978-621-96798-6-2. 2023. Sadiri Publishing. 1 400.00 400.00 Vol Oplan Exodus: The Story Of The Gallant 44 / Margarita R. Cojuangco. 2020. Isbn 9789712735875. Anvil Pub. 2 395.00 790.00 Vol Organizational Management/ Maria Victoria U. Sy. Isbn 978-621-04-5043-9. 2024. Rex Bookstore. 3 330.00 990.00 Vol Organized Land Titles And Deeds. Atty. Glenda D. Echalar – Luceres. Isbn 978-621-04-5038-5. 2023. Pb. Rex Bookstore 3 1,360.00 4,080.00 Vol Our Love Replay / Shirley Siaton. Isbn 978-621-490-060-2. 2024. Inky Sword Book Pub. 3 630.00 1,890.00 Vol Pabaon: The Ofw Kit/ Ariel Cruz Bernardo. Isbn 9789717893631. Christian Literature Crusade 3 350.00 1,050.00 Vol Pace Turning 50: A History Of The Phil. Association Of Communication Educators/ Maslog, Crispin. Isbn: --- . New Day Pub. 3 500.00 1,500.00 Vol Pagkamuot Mga Binirikol Na Usipon Gikan Europa/ Kristian Sendon Cordero, Jusan Misolas Jaroslav Olsa, Jr., Editors. Isbn 978-971-991-378-8. 2018. Ateneo De Naga Univ. Press 3 320.00 960.00 Vol Paglaum Mga Europeo Nga Susumaton Na Waray/ Michael Carlo Villas, Jerry Gracio Jaroslav Olsa, Jr., Editors (translation To Waray) Isbn 978-971-991-377-1. 2018. Ateneo De Naga Univ. Press 3 320.00 960.00 Vol Pagtuod Mga Sugilanong Europeo Sa Minasbate Kag Tigaonon/ Enrique Villasis, Clinton Abilong Jaroslav Olsa, Jr., Editors (translation To Minasbate And Tigaonon). Isbn 978-971-991-379-5. 2018. Ateneo De Naga Univ. Press 3 320.00 960.00 Vol Pahingalay: Isang Mabathalang Pag-aaral Ng Pananahimik At Maka-pilipinong Paraan Ng Pagninilay / Dorothy Javier-martinez. Isbn --- 2022. Claretian Comm. Found. Inc. 1 550.00 550.00 Vol Pamalakaya. Valledor, Arnold. Isbn 9786219678124. 2023. Balangay Books. 3 600.00 1,800.00 Vol Pamarapara. Valledor, Arnold. Isbn 9786219678131. 2023. Balangay Books. 3 600.00 1,800.00 Vol Pana-panahon: Tinipong Mga Tula/ Aida F. Santos. Isbn 978-621-95663-6-0. 2019. Gantala Press. 3 390.00 1,170.00 Vol Panaglagip: The North Remembers - Martial Law Stories Of Struggle And Survival/ Joanna K. Carino, Luchie Maranan (eds). Isbn 978-621-96513-8-7. 2023. Gantala Press. 2 550.00 1,100.00 Vol Panaglantip: Antolohia Dagiti Sarita (baro Nga Edision)/ Dionisio S. Bulong, Eden L. Cachola-bulong. Isbn 978-621-96798-7-9. 2023. Sadiri Publishing. 3 500.00 1,500.00 Vol Panagsubli Idiay Bagani Ubbog Ken Dadduma Pay A Sarita/ Reynaldo A. Duque. Isbn 978-621-96798-8-6. 2023. Sadiri Publishing. 3 600.00 1,800.00 Vol Pasasaan. Calvario, Jesus. Isbn 9786219678117. 2022. Balangay Books. 3 900.00 2,700.00 Vol Paseos De Intramuros: A Guidebook To Manila's Walled City/ Jose Victor Z. Torres. Isbn 978-971-97-0847-6 (hardbound). 2023. Vibal Pub. 2 770.00 1,540.00 Vol Patid: Mga Kontemporanyong Kuwento Mula Czech At Slovak/ Kristian Sendon Cordero Jaroslav Olsa, Jr, Et. Al, Editors (translation To Filipino). Isbn 978-971-991-386-3/9789719913771b. 2018. Ateneo De Naga Univ. Press 3 350.00 1,050.00 Vol Patrona Jurada: Centuries Of Devotion To The Nuestra Señora De Guia/ Michael P. Delos Reyes. Isbn --. 2023. Claretian Comm. Found. Inc. 1 685.00 685.00 Vol Peripheries: Histories Of Anti-marginality/ Filomeno V. Aguilar Jr. Isbn 978-971-991-382-5. 2018. Ateneo De Naga Univ. Press 3 800.00 2,400.00 Vol Philippine Cartography 4th Ed. Isbn 978-971-97-0707-3 (hardbound). Vibal Pub. 3 2,999.00 8,997.00 Vol Philippine Cinema And History (sine Tala, Box Set: Volumes 1-3). Nick Deocampo. . Isbn 9786214483181. 2023. Admu Press By Golden Books. 2 5,400.00 10,800.00 Vol Philippine Colonial Photography Of The Cordilleras (1860–1940). Isbn 978-971-97-0829-2 (hardbound). Vibal Pub. 3 1,650.00 4,950.00 Vol Philippine Compulsory Motor Vehicle Liability Insurance Law. Martirez. Isbn 978-621-02-2272-2. 2024. Pb. Central Books. 3 680.00 2,040.00 Vol Philippine Disaster Risk Reduction And Management System With Related Laws And The Constitution. Keith. Isbn 978-621-02-2171-8. 2023. Pb. Central Books. 3 920.00 2,760.00 Vol Philippine Election Law. Gabato. Isbn 978-621-02-2337-8. Hb. 2024. Central Books. 3 1,750.00 5,250.00 Vol Philippine Political Law. Cruz. Isbn 978-621-02-2309-5. 2024. Cb. Central Books. 3 2,250.00 6,750.00 Vol Philippine Procurement Law. Montemayor. Isbn 978-621-02-2287-6. 2024. Hb. Central Books 3 1,120.00 3,360.00 Vol Philippine Sourcebook On Women's Rights: Laws, Cases, And Thematic Issues. James Gregory Alcaraz Villasis. Isbn 978-621-04-4868-9. Clothbound. 2023. Rex Bookstore 3 945.00 2,835.00 Vol Physical Education And Health: Aquatic (basic Swimming) And Mountaineering /revised Ed. Punzalan, Habana. Isbn 978-971-9655-56-5. 2023. Mindshapers Co., Inc. 3 335.00 1,005.00 Vol Piarb Commercial Arbitration Handbook (2nd Edition).piarb (philippine Institute Of Arbitrators). Isbn 9789712737374/9712732256 . 2022. Anvil Pub. 3 250.00 750.00 Vol Pilipinas Kong Mahal With All The Overcoat. Deldoc, Eljay. Isbn --. 2022. Balangay Books. 3 1,200.00 3,600.00 Vol Piña Futures: Weaving Memories And Innovations By Randy M. Madrid Phd. Feu Press 2023 9789716780697 56 1,220.00 68,320.00 Vol Pinoy Devotional: Ang Kapartner Na Devo Ng Ang Bible: Pinoy Version (new Book)/ Various Contributors. Isbn 9789710099528. 2023. Omf Lit. 3 350.00 1,050.00 Vol Plakard. Abueg, Efren. Isbn 9786219612623. 2019. Balangay Books. 2 600.00 1,200.00 Vol Plant With Me: A Beginner's Guide To Gardening / By Vishnu Maluya / St. Matthew's Publishing Corporation / 2023 / 978-971-0625-487-7 56 200.00 11,200.00 Vol Play Nice And Fight Fair/ Lollette Oliva-alipe. Isbn 9789710098699.2019. Omf Lit. 2 375.00 750.00 Vol Poet On A Motorcycle. Isbn 987-971-07-0691-5. Vibal Pub. 3 600.00 1,800.00 Vol Ponderings : Christian Reflections On Life's Ambiguities / Nil Guillemette. Isbn --- Claretian Comm. Found. Inc. 1 265.00 265.00 Vol Pope Francis: Unfinished Business / Aurelio C. Joaquin. Isbn --- Claretian Comm. Found. Inc. 1 225.00 225.00 Vol Porn Detox In 31 Days To Kick Your Anxiety And Depression Away/ Amelia D. Pagdanganan & Adrian Tabalanza. Isbn 9786210601282. 2022. Lolakwentosera Book Pub. 1 349.00 349.00 Vol Post Conviction Remedies After Finality Of Judgment. Jacobe. Isbn 978-621-02-2291-3. 2024. Hb. Central Books 3 920.00 2,760.00 Vol Posterity Catalogue. 2019. Isbn: 978-971-8546-74-1. Ccp 3 750.00 2,250.00 Vol Power From The Forest: The Politics Of Logging (revised Edition). Isbn 9786214482566. 2023. Admu Press By Golden Books. 3 1,200.00 3,600.00 Vol Power Plant Diesel Laboratory Manual. Singuit. Isbn 621-418-354-8. Wiseman’s Books 3 398.00 1,194.00 Vol Practicum Manual For Tourism And Hospitality Management. Taoing, Cabugon. Isbn 978-971-9655-23-7. 2023. Mindshapers Co., Inc. 3 335.00 1,005.00 Vol Pray Bold Prayers/ Marty Ocaya. Isbn 9789710098972. 2021. Omf Lit. 3 275.00 825.00 Vol Preliminary Investigations. Montemayor. Isbn 978-621-02-2147-3. 2023. Cb. Central Books 3 1,450.00 4,350.00 Vol Presenting Prosecution Evidence For Beginners With The Judicial Affidavit Rule. Judge Rolando G. How. Isbn 978-621-04-4940-2. 2023. Clothbound. Rex Bookstore 3 1,000.00 3,000.00 Vol Presidents And Pests, Cosmopolitans And Communists. Isbn 9786214483037. 2023. Admu Press By Golden Books. 3 1,450.00 4,350.00 Vol Pretty Peach And The Color-matching Kaleidoscope 978-621-422-058-8 Tahanan Books For Young Readers, 2024 56 295.00 16,520.00 Vol Princess Tala And Prince Uncharming/ Amelia D. Pagdanganan. Isbn 9789354505070. 2024. Lolakwentosera Book Pub. 2 399.00 798.00 Vol Principles Of Total Quality Management. Pasahol Et Al. Isbn 978-971-9655-93-0. 2024. Mindshapers Co., Inc. 3 375.00 1,125.00 Vol Professional Development A Guide To Career Success. Magalona Et Al. Isbn 978-971-9655-27-5. 2023. Mindshapers Co., Inc. 3 360.00 1,080.00 Vol Professional Salesmanship/ Mecmack Nartea. Isbn 978-621-04-5077-4. 2024. Rex Bookstore. 3 475.00 1,425.00 Vol Promoting Community Change Through Civic Welfare Training Service 2. Briones, Et.al. Isbn 978-621-409-245-1. 2024. Books Atbp. 3 350.00 1,050.00 Vol Property And Land Laws. Dela Rama Isbn 978-621-02-2154-1. 2023. Hb. Central Books 3 1,950.00 5,850.00 Vol Providence Is Enough/ Mel Caparros. Isbn 9789710099597. 2023. Omf Lit. 3 325.00 975.00 Vol Prusisyon : Paghahanda At Pagdiriwang / Michael P. Delos Reyes.isbn ___. Claretian Comm. Found. Inc. 1 285.00 285.00 Vol Public Safety And Criminal Justice System. Keith. Montemayor. Isbn 978-621-02-2167-1. 2023. Pb. Central Books. 3 950.00 2,850.00 Vol Puso Pa Rin Ang Nagpasiya. Isbn 978-971-07-4142-7. Vibal Pub. 3 440.00 1,320.00 Vol Quality Service Managment In Tourism And Hospitality. M.b. Baluyot. Isbn 978-621-406-332-1. 2021. Mindshapers Co., Inc. 3 335.00 1,005.00 Vol Quantity Cookery And Catering Management (a Guide To Students, Leading To Commercial Cooing Nc Iii). Corazon Barateta Prades. Isbn978-621-409-184-3. 2023. Books Atbp. 3 500.00 1,500.00 Vol Qvid-19 Quotes During Covid-19 Jill Barcelona-suzuki. Paperkat Books. Isbn 978-621-8232-62-4 2022 56 250.00 14,000.00 Vol Racism And The Filipino Diaspora: Essays In Cultural Politics/ E San Juan. Isbn 9789719913696. 2018. Ateneo De Naga Univ. Press 3 300.00 900.00 Vol Radical: Readings In Rizal & History/ John Nery. Isbn 9786218230248. 2024. Domercura Enterprises 1 1,820.00 1,820.00 Vol Raising Independent Learners: A Parents Guide To Online And Offline Schooling/ Queena Lee-chua. Isbn 9789712736339. 2021. Anvil Pub. 2 250.00 500.00 Vol Raising Moms (first Edition)/ Berlin Domingo Maynigo. Isbn 978-621-8232-47-1. 2021. Hs Grafik Print/paperkat Books 1 450.00 450.00 Vol Ranga: Writings On Bikol/ Danton Remoto Isbn 978-971-991-364-1. 2019. Ateneo De Naga Univ. Press 3 400.00 1,200.00 Vol Rebellions: Notes On Independence: Edited And Curated Essays/ Katrina Stuart Santiago Isbn 978-971-991-373-3. 2018. Ateneo De Naga Univ. Press 3 310.00 930.00 Vol Reddest Rose Unfolds/ Liv Stromquist. Isbn 9789718281239. 2022. Milflores Pub. 2 799.00 1,598.00 Vol Redeemed: How Did I Know I Was?: A Collection Of Memoirs / By L. L. Tumbaga. Isbn – 2022. Claretian Comm. Found. Inc. 1 420.00 420.00 Vol Regulatory Framework And Legal Issues In Business/ Rosalie Cada. Isbn 978-621-04-4500-8. 2023. Rex Bookstore. 3 699.00 2,097.00 Vol Revisiting Readings In Philippine History. Baes, Francisco. Isbn 978-971-9655-60-2. 2023. Mindshapers Co., Inc. 3 425.00 1,275.00 Vol Rich Ma’am, Poor Mom: Ang Pantolohiya Ng Problema Sa Pera/ Amelia D. Pagdanganan. Isbn 978-621-06-1243-1. 2024. Lolakwentosera Book Pub. 3 349.00 1,047.00 Vol Rizal And The Dev. Of Fil. Nationalism, 2e. Garcia, Et Al. Isbn 978-621-409-211-6. 2023. Books Atbp. 3 450.00 1,350.00 Vol Rizal In Saga/nick Joaquin 9789718281123 56 1299.00 72,744.00 Vol Rodolfo Biazon: Soldier, Solon, Statesman/ Eric Ramos. Isbn 9789718281277. 2022. Milflores Pub. 2 995.00 1,990.00 Vol Romances: Variations On Love: Edited And Curated Essays/ Katrina Stuart Santiago Isbn 978-971-991-374-0. 2018. Ateneo De Naga Univ. Press 3 300.00 900.00 Vol Ruminations Christian Reflections On Life’s Ambiguities/ Nil Guillemette. Claretian Comm. Found. Inc. 1 265.00 265.00 Vol Ruta: Mga Bago At Piling Tula/ Benilda S. Santos Isbn 978-971-991-392-4. 2019. Ateneo De Naga Univ. Press 3 550.00 1,650.00 Vol Sa Aking Henerasyon: Mga Tula At Saling-tula/ Kerima Lorena Tariman. Isbn 978-621-96513-5-6. 2022. Gantala Press. 3 795.00 2,385.00 Vol Sa Ikailang Sirkulo Ng Impiyerno. Miguel, Paolo. Isbn 9786219678100. 2022. Balangay Books. 3 500.00 1,500.00 Vol Sa Kalye Mailap. Ana Digi. 2023. Isbn 9786219629751. Street Tales Publishing House. 56 250.00 14,000.00 Vol Sa Kalye Mailap. Ana Digi. 2023. Isbn 9786219629751. Street Tales Publishing House. 3 350.00 1,050.00 Vol Sa Yakap Ng Gubat At Dagat Ng Palawan: Mga Ekosanaysay / John Iremil Teodoro. Isbn 978-621-96301-3-9. 2021. Pawikan Press 2 350.00 700.00 Vol Safe Spaces Law And Related Laws (bawal Bastos Law). Montemayor. Isbn 978-621-02-2211-1. 2023. Hb. Central Books. 3 1,120.00 3,360.00 Vol Salamin At Iba Pang Panglaw. Tiburon, Almayrah. Isbn 978-971-9699-19-4. 2018. Balangay Books. 2 500.00 1,000.00 Vol Sales And Lease Notes And Jurisprudence. Albano. Isbn 978-621-02-2346-0. 2024. Hb. Central Books. 3 1,680.00 5,040.00 Vol Saloobin: Mga Akda Ng/para Sa Kababaihang Bilanggong Pulitikal/ Reina Mae Nasino, Cora Agovida, Et Al. Isbn ____. 2021. Gantala Press. 3 300.00 900.00 Vol Samantalang Sakop At Iniibig: Panibagong Tulambuhay/ Edgar Calabia Samar. Isbn Isbn 978-971-991-370-2. 2018. Ateneo De Naga Univ. Press 3 350.00 1,050.00 Vol Samtoy: Mga Kuwentong Ilokano (bagong Edisyon)/ Ariel Sotelo Tabag (editor). Isbn 978-621-8389-06-9. 2023. Sadiri Publishing. 3 500.00 1,500.00 Vol Sangguniang Aklat Ng Gramatika At Pagbuo Ng Mapa Sa Wika. Alvarado Et Al. Isbn 978-971-9655-61-9. 2023. Mindshapers Co., Inc. 3 375.00 1,125.00 Vol Sari-sari Stories: Romance Edition. Hezekiah Louie Zaraspe, Cheenee Astilla, Hadlee Zircon, And Jaymar Chavez Isbn 978-621-8289-57-4. Pbk. Bookshelfph Ambidextr 3 670.88 2,012.64 Vol Scenes Reclaimed. 2021. Isbn: 978-971-8546-840. Ccp 3 400.00 1,200.00 Vol Security Officers Manual On Leadership And Management/ D. Bobier. Isbn 978-621-488-010-2. 2024. Chapter House Pub. 3 548.00 1,644.00 Vol Sexual Harassment & Lorsiw: Love, Romance, Sex, & Immorality In The Workplace Vol. I. (ret.) Usec. Josephus B. Jimenez, Atty. John Paul S. Jimenez. Isbn 978-621-04-5157-3. Clothbound With Jacket. 2023. Rex Bookstore 3 2,000.00 6,000.00 Vol Shadow & Light / Shirley Siaton. Isbn 978-621-490-059-6. 2024. Inky Sword Book Pub. 1 480.00 480.00 Vol Si Cielo At Ang Asong Si Stella Chikiting Books 56 160.00 8,960.00 Vol Si Gren, Ang Kaibigan Kong Alien Bernadette V. Neri. Paperkat Books Isbn 978-621-487-015-8 2024 56 299.00 16,744.00 Vol Sikwateng Uwan/ Jeena Rani Marquez & Maria Elena Paulma. 2023. Isbn 978-971-9094-39-5. Xavier Univ. Press 3 530.00 1,590.00 Vol Silver Is My Gold/ Adolfo Azcuna. Isbn 9789718281291. 2023. Milflores Pub. 3 895.00 2,685.00 Vol Sinesosyedad: Isang Manwal Sa Pagbasa At Pagsusuri Ng Pelikulang Filipino. Jaime Ang. Isbn 978-621-406-273-7. 2020. Mindshapers Co., Inc. 3 275.00 825.00 Vol Sino Ang Dakila? Sino Ang Tunay Na Baliw/ Amelia D. Pagdanganan. Isbn 9786210210095. 2020. Lolakwentosera Book Pub. 3 349.00 1,047.00 Vol Sinta. Ana Digi. 2020. Isbn 9786219629706. Street Tales Publishing House. 56 250.00 14,000.00 Vol Sinta. Ana Digi. 2020. Isbn 9786219629706. Street Tales Publishing House. 3 250.00 750.00 Vol Six Filipino Women For Justice/ Rosario A. Garcellano And Six Others. Isbn 9786218230293. 2024. Domercura Enterprises 2 2,560.00 5,120.00 Vol Smart Kids 100 Awesome Bible Stories Ws Pacific Publications, Inc ., 9786214331550 56 329.00 18,424.00 Vol So This Is Youth/ Anaknirizal. Isbn 9712738111. 2024. Anvil Pub. 3 199.00 597.00 Vol So You Think You Can Self-edit Kath C. Eustaquio-derla. Isbn 978-621-8232-60-0. 2022. Hs Grafik Print/paperkat Books 1 420.00 420.00 Vol Social Enterprise Stories Of Resilience And Innovation. Isbn 9786214483136. 2023. Admu Press By Golden Books. 3 600.00 1,800.00 Vol Social Security System (sss). Montemayor. Isbn 978-621-02-2037-7. 2023. Hb. Central Books 3 1,580.00 4,740.00 Vol Society, Science, And Technology: Social Dynamics Of Scientific Discovery And Technological Innovation. Padolina. Isbn 978-971-07-4259-2. 2019. Vibal Pub. 3 580.00 1,740.00 Vol Solo Flight. Dela Cruz, Rita. Isbn 978-971-9699-27-9. 2020. Balangay Books. 3 600.00 1,800.00 Vol Speak Without Fear Public Speaking. Sonia B.sygaco. Isbn 9789719645818. 2022. Great Books Trading 3 495.00 1,485.00 Vol Special Crime Investigation With Interview And Interrogation Protocols. Domingo. Isbn 621-418-334-0. 2024. Wiseman’s Books 3 498.00 1,494.00 Vol Special Crime Investigation With Legal Medicine 2nd Ed./ Pltcol Sabino-diangson. Isbn 978-971-9647-90-4. 2023. Chapter House Pub. 2 468.00 936.00 Vol Specialized Crime Investigation 2 W/interview & Interrogation / Arcipe, Estillero, Apela. Isbn 978-621-488-032-4. 2025. Chapter House Pub. 3 448.00 1,344.00 Vol Specimen Zero/ Joel Pablo Salud. Isbn 9786218230262. 2024. Domercura Enterprises 1 1,930.00 1,930.00 Vol Spooky Mo/ Marivi Soliven. Isbn 9789718281253. 2022. Milflores Pub. 3 499.00 1,497.00 Vol Spots Of Time: Memoir Of The Mind/ Paulino Lim Jr. Isbn 978-971-991-371-9. 2018. Ateneo De Naga Univ. Press 3 350.00 1,050.00 Vol Ssgt. Ticticrubong On Da Road: 9 A Salaysay Ken 8 A Sarita/ Leonardo S. Fagaragan. Isbn 978-621-96798-4-8. 2023. Sadiri Publishing. 3 400.00 1,200.00 Vol State Of Emergency And Related Laws/ Montemayor. Isbn 978-621-02-2195-4. Hb. 2024. Central Books 3 1,250.00 3,750.00 Vol Stock Investing For Busy Professionals/ Charlie Lai. Isbn 978-621-487-006-6. 2024. Hs Grafik Print/paperkat Books 2 1,000.00 2,000.00 Vol Stop Taking Sides/ Adam Mabry. Isbn 9789710099146. 2022. Omf Lit. 3 395.00 1,185.00 Vol Stories From The Other Side And Other Narratives, (revised Ed.). De Viana.isbn978-621-409-216-1. Books Atbp. 3 850.00 2,550.00 Vol Strategic Management In Tourism & Hospitality Industry. Buenventura Et Al. Isbn 978-971-9655-86-2. 2024. Mindshapers Co., Inc. 3 400.00 1,200.00 Vol Stray Cats. Isbn 9786214482771. 2023. Admu Press By Golden Books. 3 1,150.00 3,450.00 Vol Stronger/ Fr. Bob Mcconaghy. Isbn 9789710072750. 2023. Shepherds Voice Pub. 3 350.00 1,050.00 Vol Sulatan Sa Panahon Ng Pandemya/ Merlinda Bobis, Mailin Paterno, Joi Barrios (eds). Isbn978-621-96513-6-3. 2022. Gantala Press. 2 550.00 1,100.00 Vol Super Bagyo! / Evasco, Eugene Y. -- Quezon City : Lampara Publishing House, Inc., 2024. 56 159.75 8,946.00 Vol Surprise Journey: A Spiritual Memoir. Josefina J. Card. Isbn 978-621-8289-62-8. Pbk. Bookshelfph Ambidextr 3 670.88 2,012.64 Vol Sustainable Tourism: A Comprehensive Guide To Promoting Responsible Travel. Maranan Et Al. Isbn 978-971-9655-88-6. 2024. Mindshapers Co., Inc. 3 375.00 1,125.00 Vol Sūysūy Ni Sarena In Paglawa’ Sin Hambuuk Sultaniyya / Criselda Yabes. Isbn 978-621-96550-0-2. 2022. Pawikan Press 3 300.00 900.00 Vol Takbo! Kapag Naging Tinig Ang Tunog 978-621-422-051-9 Tahanan Books For Young Readers, 2024 56 195.00 10,920.00 Vol Tatlong Proposisyon Ng Hangin. Sicat, Cleto Luna. Isbn. -- 2024. Balangay Books. 3 1,000.00 3,000.00 Vol Taxation Laws In The Philippines. Masacayan. Isbn 978-621-02-2248-7. 2024. Pb. Central Books. 3 620.00 1,860.00 Vol Tdt Manual (timothy Discipleship Training)/ Jose C Floresta. Isbn 9789717893495. 2017. Christian Literature Crusade 3 275.00 825.00 Vol Teaching And Assessment Of Literature Studies/ Maureen Domingo-bondoc, Rodolfo Grefiel Reyes Ii. Isbn 978-621-04-5078-1. 2024. Rex Bookstore. 3 365.00 1,095.00 Vol Teaching The Faith/ Maria Lucia C. Natividad. Isbn -----. Claretian Comm. Found. Inc. 3 245.00 735.00 Vol Tears In A Bottle / Msgr. Fernando Gutierrez. Isbn -------. Claretian Comm. Found. Inc. 1 230.00 230.00 Vol Technical English 1: Investigative Report Writing And Presentation / Pmaj J Alvarez. Isbn 978-971-9647-74-4. 2023. Chapter House Pub. 2 428.00 856.00 Vol Technical English 2: Legal Forms/ Pmaj J Alvarez. Isbn 978-971-9647-75-1. 2023. Chapter House Pub. 2 438.00 876.00 Vol Telling The Story Of Jesus/ Cardinal Luis Antonio Tagle. Isbn --- Claretian Comm. Found. Inc. 3 120.00 360.00 Vol Ten Talks Ten Cities/ Merlee Cruz-jayme. Isbn 97127-3817-3. 2024. Anvil Pub. 3 299.00 897.00 Vol The Law On Public Officers. Gabato. Isbn 978-621-02-2169-5. 2023. Hb. Central Books 3 1,450.00 4,350.00 Vol The Adventures Of Cayo Malínao And Other Philippine Novelettes. Isbn 978-971-97-0843-8 (hardbound). Vibal Pub. Hb 3 770.00 2,310.00 Vol The Anti-terrorism Law And Allied Laws. Romano. Isbn 978-621-02-2459-7. Hb. 2024. Central Books. 3 1,250.00 3,750.00 Vol The Art Of Duddley Diaz (sb). Isbn 978-971-0538-09-6. Vibal Pub. 3 1,100.00 3,300.00 Vol The Art Of Dying/ Ma. Lourdes De Vera. Isbn.---- Claretian Comm. Found. Inc. 3 235.00 705.00 Vol The Art Of Rest/ Adam Mabry. Isbn 9789710099153. 2022. Omf Lit. 3 445.00 1,335.00 Vol The Awakening Volume One Of Alamat: A History Of The Awakened Kadi Serafica. Paperkat Books Isbn 978-621-487-000-4 2024 56 550.00 30,800.00 Vol The Awakening Volume One Of Alamat: A History Of The Awakened/ Kadi Serafica. Isbn 978-621-487-000-4. 2023. Hs Grafik Print/paperkat Books 1 600.00 600.00 Vol The Battle Of Marawi / Criselda Yabes. Isbn978-621-96301-4-6. 2020. Pawikan Press 2 550.00 1,100.00 Vol The Blue Book - Reviewer For Board Licensure Examination For Criminologists Volume 1: Professional Courses. Garcia. Isbn 621-418-330-2. 2024. Wiseman’s Books 3 698.00 2,094.00 Vol The Blue Book - Reviewer For Board Licensure Examination For Criminologists Volume 2: Area 2 A-c Major Courses. Garcia. Isbn 621-418-356-2. 2024. Wiseman’s Books 3 898.00 2,694.00 Vol The Blue Book - Reviewer For Board Licensure Examination For Criminologists Volume 3: Area 2 D-e Major Courses + Area 3 Special Courses . Garcia. Isbn 621-418-358-6. 2024. Wiseman’s Books 3 698.00 2,094.00 Vol The Book Of Pedro Bautista: A Novella/ Mary Jane Guazon Uy. Isbn 978-971-991-387-0. 2019. Ateneo De Naga Univ. Press 3 400.00 1,200.00 Vol The Broken Places/ Teddy Espela. Isbn 978-621-472-026-2. 2022. Ateneo De Naga Univ. Press 2 400.00 800.00 Vol The Burning Of Macabebe By Ian Christopher Alfonso Holy Angel University, Inc., Angeles City, Philippines 979-971-0546-70-1 56 600.00 33,600.00 Vol The Cautious Legal Writer. Mendoza. Isbn 978-621-02-1859-6. 2022. Cb. Central Books. 3 1,150.00 3,450.00 Vol The Church Can Handle The Truth/ Jose Mario Bautista Maximiano. Isbn -- Claretian Comm. Found. Inc. 1 250.00 250.00 Vol The Complete Poems And Plays Of Jose Rizal, Sc By Nick Joaquin Feu Press 2023 9789716780703 56 780.00 43,680.00 Vol The Contemporary World: Looking Through The Lenses Of Globalization. Bihasa, Cr. Isbn 978-621-409-174-4. 2022. Books Atbp. 2 495.00 990.00 Vol The Courage To Be Happy/ Pope Francis. Isbn ----. Claretian Comm. Found. Inc. 3 195.00 585.00 Vol The Crime Circle Second Edition/ Yeyet Soriano. Isbn 978-621-487-020-2. 2024. Hs Grafik Print/paperkat Books 3 700.00 2,100.00 Vol The Data Privacy Law. Montemayor. Isbn 978-621-02-0961-7. 2021. Cb. Central Books. 3 880.00 2,640.00 Vol The Drama Of Dictatorship: Martial Law And The Communist Parties Of The Philippines. Isbn 9786214483051. 2023. Admu Press By Golden Books. 3 2,100.00 6,300.00 Vol The Filipino Church At The Crossroads / Michael Demetrius H. Asis. Isbn --- Claretian Comm. Found. Inc. 1 225.00 225.00 Vol The Garden Of God's Grace/ Darlene Sala, Bonnie Sala, Luisa Collopy. Isbn 9789710099047. 2021. Omf Lit. 3 275.00 825.00 Vol The Good And Beautiful You/ James Bryan Smith. Isbn 9789710099252. 2022. Omf Lit. 3 325.00 975.00 Vol The Gospel Of Food/ Sharwin Tee. Isbn 9789712736445. 2021. Anvil Pub. 2 250.00 500.00 Vol The Government Procurement Reform Act (principles And Practices) Atty. Lawrence P. Villanueva. Isbn 978-621-04-5004-0.2023. Clothbound. Rex Bookstore 3 1,750 5,250.00 Vol The Islands Of Faith/ Fr. Andrew Recepcion. Isbn 978-621-472-032-3. 2022. Ateneo De Naga Univ. Press 1 750.00 750.00 Vol The Kindness Of Birds/ Merlinda Bobis. Isbn : 9789712736711. 2021. Anvil Pub. 2 295.00 590.00 Vol The Last Divide / Shirley Siaton. Isbn 978-621-8371-13-2. 2024. Inky Sword Book Pub. 1 540.00 540.00 Vol The Last Sacristan Mayor And The Most Expensive Mass For The Dead: Tales From Ticao/isbn 9789719913658. 2017. Ateneo De Naga Univ. Press 3 350.00 1,050.00 Vol The Legend Of Tessie Agana: Beloved Childstar Of The Philippines. Mylene Agana Jao Richardson. Isbn 978-621-8289-46-8. Hardbound. Bookshelfph Ambidextr 3 1,680.00 5,040.00 Vol The Life And The Manila Times Of David T. Boguslav. Isbn 971944706. 2011. Manila Times. 2 1,290.00 2,580.00 Vol The Literary Life. Isbn 971928238. 2007. Manila Times 2 347.00 694.00 Vol The Local Government Code With Implementing Rules And Regulations. Isbn 978-621-02-2023-0. 2023. Cb. Central Books 3 1,750.00 5,250.00 Vol The One Year Salt And Light Devotional/ Chris Tiegreen. Isbn 9789710098453. 2019. Omf Lit. 3 365.00 1,095.00 Vol The Patchwork City: Class, Space, And Politics In Metro Manila. Isbn 9786214483006. 2023. Admu Press By Golden Books. 3 1,650.00 4,950.00 Vol The Pope Francis Agenda/ Donal Dorr . Isbn --- Claretian Comm. Found. Inc. 3 275.00 825.00 Vol The Priesthood In A Church Renewed/ Amado L. Picardal. Isbn ____. Claretian Comm. Found. Inc 1 225.00 225.00 Vol The Public - Private Partnership Code Of The Philippines. Nague. Isbn 978-621-02-2427-6. Hb. 2024. Central Books 3 1,580.00 4,740.00 Vol The Revised Penal Code Book I - Understanding Criminal Law (2nd Edition). Tulalian. Isbn 621-418-229-9. 2024. Wiseman’s Books 3 398.00 1,194.00 Vol The Revised Penal Code Book Ii Notes And Cases. Atty. Carmencita Dabu, Ann Kathryn Diaz, Pedro Dabu. Isbn 978-621-04-5006-4 Clothbound. 2023. Rex Bookstore 3 2,350.00 7,050.00 Vol The Revised Penal Code Book Ii, Specific Crimes And Their Elements 2nd Edition. Tulalian. Isbn 621-418-230-5. 2024. Wiseman’s Books 3 498.00 1,494.00 Vol The Revolutionary Reader Of E. San Juan Jr.: Essays On Critical Theory And Cultural Politics. Isbn 978-971-97-0857-5. Vibal Pub. 3 1,650.00 4,950.00 Vol The Risk Of Hope: Telling The Story Of God In Our Day/ Cardinal Luis Antonio Tagle. Isbn-----. Claretian Comm. Found. Inc 3 175.00 525.00 Vol The Sacrament Of Orders And The Clerical State/ Adolfo Dacanay. Isbn 9789712735868. 2020. Anvil Pub 2 395.00 790.00 Vol The Saga Of The Blue Dress/ Marily Sasota Gayeta. Isbn 978-621-8232-95-2. 2023. Hs Grafik Print/paperkat Books 3 600.00 1,800.00 Vol The Saga Of The Fugitive Indio Priest: A Novella/ Elmer A. Ordonez. Isbn 978-971-991-380-1. 2018. Ateneo De Naga Univ. Press 3 400.00 1,200.00 Vol The Secret Of Derek Guerrero/ Mark Manalang. Isbn 978-621-96328-7-4. 2021. Hs Grafik Print/paperkat Books 1 650.00 650.00 Vol The Seven Last Words Of Christ/ Fr. Thomas Rosica. Isbn ------. Claretian Comm. Found. Inc. 3 135.00 405.00 Vol The Seventeenth Wave / Cesar Pulido Vallarta. Isbn.-----. Claretian Comm. Found. Inc. 3 550.00 1,650.00 Vol The Shadow Immortals/ John Luke Chica. Isbn 978-621-8232-25-9. 2021. Hs Grafik Print/paperkat Books 1 620.00 620.00 Vol The Solemn Lantern Maker / Merlinda Bobis. Isbn 9712737947. 2024. Anvil Pub 2 295.00 590.00 Vol The Star Of Panghulo/ Patricio Mariano, Soledad S. Reyes, Translator. Isbn 978-971-991-375-7. 2018. Ateneo De Naga Univ. Press 3 350.00 1,050.00 Vol The Town Of Perpetual Autum/beatrice Pobre. Isbn 978-621-487-027-1 (paperback).2024. Hs Grafik Print/paperkat Books 3 550.00 1,650.00 Vol The True Taste Of Water: A Social Worker’s Lived Experience Of Volunteerism/ Angelito B. Meneses. Isbn 978-621-8389-07-6. 2024. Sadiri Publishing. 2 500.00 1,000.00 Vol The Ultimate Filipino Adobo: Stories + Recipes From The Heart (2nd Edition)/ Claude Tayag. Isbn 9712738531. 2024. Anvil Pub. 3 650.00 1,950.00 Vol The World Of Manila-acapulco Galleons. Isbn 978-971-97-0702-8 (hardbound). Vibal Pub. 3 2,750.00 8,250.00 Vol The You-have-to-go-through-a-lot-of-crap-ideas-to-get-good-ideas Book/ David Guerrero. Isbn 789718281130. 2022. Milflores Pub. 3 225.00 675.00 Vol Theories Of Crime Causation - An Instruction And Learning Guide. Caballero/ Barican. Isbn 621-418-340-1. 2024. Wiseman’s Books 3 498.00 1,494.00 Vol Theories Of Crime Causation/ B. Salamanca, E. Vibar-galindez, D. Lucenara. Isbn 978-621-488-000-3. 2024. Chapter House Pub. 2 448.00 896.00 Vol Therapeutic Modalities 3rd Ed./ M. Balares, C. Beit-chavez, R. Pecson, R. Tamayo. Isbn 978-621-488-026-3. 2024. Chapter House Pub. 2 448.00 896.00 Vol Thesis And Dissertation Writing Made Easy. Mendoza Et Al. Isbn 978-971-9655-53-4. 2023. Mindshapers Co., Inc. 3 250.00 750.00 Vol Thirty Days With Lolo Kiko: A Deepening On Pope Francis' Teachings And Wisdom In His 2015 Pastoral Visit To The Philippines / Bro. Jess N. Matias, Ofs. Isbn--- Claretian Comm. Found. Inc. 2 140.00 280.00 Vol This Heart Of Mine: A Love Poem Collection. Shirley Siaton. Isbn 978-621-8371-15-6. 2024. Inky Sword Book Pub. 3 470.00 1,410.00 Vol This Season Of Grief/ Various Contributors. Isbn 9789710098903. 2018. Omf Lit. 3 275.00 825.00 Vol Thrive! A Parent’s Journey To Resilience/ Cherie Ann Lo, Ma, Msc, Rpsy And 5 Others. Isbn 9789712737862. 2023. Anvil Pub. 3 200.00 600.00 Vol Tikim: Essays On Phil. Food And Culture (expanded And Updated)/ Doreen Fernandez. Isbn 9712738524. 2024. Anvil Pub. 2 299.00 598.00 Vol Tingle: Anthology Of Pinoy Lesbian Writing/ Jhoanna Lynn Cruz. Isbn 9789712735974. 2021. Anvil Pub. 3 295.00 885.00 Vol Tomana/ Juan S.p. Hidalgo Jr. Isbn 978-621-8389-03-8. 2023. Sadiri Publishing. 3 600.00 1,800.00 Vol Torts And Damages Commentary And Jurisprudence. Albano. Isbn 978-621-02-2349-1. 2024. Hb. Central Books. 3 1,480.00 4,440.00 Vol Toward A Bai Theology Catholic Feminism In The Philippines/ Edited By Virginia Fabella, Mm And Agnes M. Brazal. Isbn – 2023. Claretian Comm. Found. Inc. 1 400.00 400.00 Vol Transcendence: Understanding Contemporary Global Dynamics, Issues, And Challenges. Dc Coronacion; Fc Calilung. Isbn 978-621-409-249-9. 2024. Books Atbp. 3 495.00 1,485.00 Vol Transforming Believers/ Dr Alfonso G. Pablo Sr. Isbn 9789717893693. Christian Literature Crusade 3 350.00 1,050.00 Vol Transforming Faith/ Dr. Alfonso G. Pablo Sr. Isbn 9789717893778. Christian Literature Crusade 3 425.00 1,275.00 Vol Transforming Households/ Dr Alfonso G Pablo Sr. Isbn 9789717892993. 2014. Christian Literature Crusade 2 275.00 550.00 Vol Transforming Women/ Filipina A. Pablo. Isbn 9789717893716. Christian Literature Crusade 3 325.00 975.00 Vol Traveling: A Spiritual Seeker's Guide. Josefina J. Card. Isbn 978-621-8289-63-5. Pbk. Bookshelfph Ambidextr 3 782.88 2,348.64 Vol Treatise On Administrative Investigation And Adjudication. Malabanan. Isbn 978-621-02-2280-7. 2024. Hb. Central Books. 3 1,480.00 4,440.00 Vol Treatise On Improving The Professional Standards Of Customs Brokers In The Philippines. Nague. Isbn978-621-02-2412-2 Hb. 2024. Central Books. 3 1,080.00 3,240.00 Vol Treatise On The Local Government Law In The Philippines: Notes And Cases. Central Book Supply, Inc., Isbn 978-621-02-2498-6 Madrona Pb 2024 56 850.00 47,600.00 Vol Trilohiya Ng Mga Bilang (box Set : Volumes 1-3). Edgar Calabia Samar. . Pb. Aup/ 2023/ 9786214482849 (volume 1), 9786214482863 (volume 2), 9786214482887 (volume 3) 2 4,050.00 8,100.00 Vol Tuklas Sining Coffee Table Book: Essays On The Philippine Arts. Isbn --. Ccp 3 1,000.00 3,000.00 Vol Turning Back The Pages/ Rosalinda L. Orosa. Isbn 9719447030. 2010. Manila Times. 2 300.00 600.00 Vol Two Less Lonely People In The World/ Amelia D. Pagdanganan. Isbn 9786218163713. 2021. Lolakwentosera Book Pub. 3 349.00 1,047.00 Vol Ukay-ukay, Halukay At Buhay/ Wilfredo M. Sanson, Sj. Isbn ----. Claretian Comm. Found. Inc. 3 235.00 705.00 Vol Unburdened/ Chris Tiegreen. Isbn 9789710098897. 2020. Omf Lit. 3 325.00 975.00 Vol Under Cover Revised & Updated/ John Bevere. Isbn 9781404113572. 2019. Omf Lit. 3 450.00 1,350.00 Vol Under The City Lights/ S.j. Wolf. Isbn 978-621-96328-3-6. 2020. Hs Grafik Print/paperkat Books 1 600.00 600.00 Vol Understanding The Self: A Guide For The Perplexed. Isbn 978-971-07-4543-2. 2020. Vibal Pub. 3 450.00 1,350.00 Vol Understanding The Self: New Normal Edition. Palean, Et Al. Isbn 978-621-409-224-6. 2024.books Atbp. 3 490.00 1,470.00 Vol Unmasking The Myth On Male Abuse. Jimenez. Isbn 978-621-02-2200-5. 2023. Cb. Central Books. 3 880.00 2,640.00 Vol Unraveling The Absolute Moral Principle: Ethics For College Students (rev.ed). L.e. Buenaflor, Et Al. Isbn 978-621-409-229-1. 2024. Books Atbp. 3 475.00 1,425.00 Vol Unraveling The Past: Readings In Philippine History. Isbn 978-971-07-4235-6. 2018. Vibal Pub. 3 460.00 1,380.00 Vol Unrequited/raymond Oliver Aquino Cruz. Isbn Isbn 978-621-8232-04-4 (paperback). 2020. Hs Grafik Print/paperkat Books 1 300.00 300.00 Vol Upscaling Oral Communication Skills In The 21st Century Global Space. Gutierrez, Et Al. Isbn 978-621-409-255-0. 2024. Books Atbp. 3 325.00 975.00 Vol Vice And Drug Education And Control 4th Ed./ Pltcol L Cejes, Pltcol M Libres. Isbn 978-621-488-023-2. 2024. Chapter House Pub. 2 428.00 856.00 Vol Violence Against Women And Their Children. Central Book Supply, Inc., Isbn 978-621-02-2253-1 Tagupa Hb 2024 59 1,080.00 63,720.00 Vol Voyager And Other Fictions (new Edition)/ Jose Y. Dalisay Jr. Isbn 9789712737794. 2023. Anvil Pub. 3 399.00 1,197.00 Vol Walking Together On The Road Of Dialogue/ Sebastiano D’ Ambra. Isbn ---claretian Comm. Found. Inc. 1 180.00 180.00 Vol Web Applications Using Php & Mysql. Pahayahay. Isbn 978-971-9655-75-6. 2024. Mindshapers Co., Inc. 3 400.00 1,200.00 Vol What Am I To You/ Kath C. Eustaquio-derla. Isbn 978-621-95553-4-0. 2017. 3 320.00 960.00 Vol When Bad News Is Good News/ Bernadette Sembrano. Isbn 9789710072743. 2023. Shepherds Voice Pub. 58 427.50 24,795.00 Vol White Lady Black Christ/ Charlson Ong. Isbn 9789718281369. Milflores Pub. 1 599.00 599.00 Vol Why Keanu Reeves Is Lonely And Why The World Goes On As It Does/ Simeon Dumdum, Jr. Isbn 9789718281055. 2023. Milflores Pub. 1 399.00 399.00 Vol Will You Happen, Past The Silence, Through The Dark?: Remembering Leonard Ralph Casper. Isbn 9786214482764. 2023. Admu Press By Golden Books. 3 1,800.00 5,400.00 Vol Women Of The Word : How To Study The Bible/ Jen Wilkin. Isbn 9789710099283. 2022. Omf Lit. 3 325.00 975.00 Vol Word On Fire: Proclaiming The Power Of Christ/ Robert Baron. Isbn --- Claretian Comm. Found. Inc. 1 260.00 260.00 Vol Write Here Write Now: 12th Anniversary Edition/ Aa Patawaran. Isbn 9712738722. 2024. Anvil Pub. 2 350.00 700.00 Vol X75+ Coffee Table Book/ Xavier University. 2010. Isbn 978-971-9094-07-4. Xavier Univ. Press 1 1,150.00 1,150.00 Vol Yes! You Really Can Change/ Chip Ingram. Isbn 9789710099412. 2022. Omf Lit. 3 395.00 1,185.00
Closing Date18 Dec 2024
Tender AmountPHP 2.7 Million (USD 47.3 K)
621-630 of 630 active Tenders