Manpower Tenders
Manpower Tenders
City Of Dipolog Tender
Civil And Construction...+2Construction Material, Machinery and Tools
Philippines
Details: Description This Includes: Item 1 – General Requirements Materials Contruction Mask 5pcs X 65.00 325.00 Rubber Gloves 5pairs X 70.00 350.00 Rubber Boots 5pairs X 150.00 750.00 Construction Helmet 5pcs X 480.00 2,400.00 Billboard (frame + Tarpaulin 1unit X 3,000.00 3,000.00 For Project Det) 4’x8’ Tarpaulin Manpower Engineering Assistant 1day X 500.00 500.00 Laborers(2 Men) 4days X 370.00 740.00 Item 102 – Excavation Works Manpower Project Engineer 2days X 500.00 1,000.00 Laborers(2 Men) 4days X 370.00 1,480.00 Equipment Concrete Cutter 1day Backhoe W/ Breaker Rental 2days X 400.00 800.00 Dumptruck 2days X 200.00 400.00 Fuel Diesel 200l X 75.00 15,000.00 Gasoline 20l X 80.00 1,600.00 Item 500 – Pipe Culverts And Storm Drain Materials 24”ø Reinforced Concrete Culvert Pipe 8pcs X 2,200.00 17,600.00 Gravel 1 Cu.m X 1,300.00 1,300.00 Fine Aggregates 1 Cu.m X 1,300.00 1,300.00 Portland Cement 5 Bags X 285.00 1,425.00 Manpower Project Engineer 3days X 500.00 1,500.00 Mason 3days X 500.00 1,500.00 Laborers(2 Men) 6days X 370.00 2,220.00 Item 200 – Sub Base Coarse Materials 1 ½”ømax. Mixed Sand & Gravel 2cu.m X 1,300.00 2,600.00 Manpower Project Engineer 1day X 500.00 500.00 Masons 2days X 500.00 1,000.00 Laborers 8days X 370.00 2,960.00 Equipment Payloader 1day X 500.00 500.00 Fuel Diesel 120l X 75.00 9,000.00 Item 506 – Stone Masonry/catch Basin Materials Head Size Boulders 2cu.m X 1,300.00 2,600.00 Portland Cement 5bags X 285.00 1,425.00 Fine Aggregates 1cu.m X 1,300.00 1,300.00 Manpower Project Engineer 2days X 500.00 1,000.00 Mason 2days X 500.00 1,000.00 Laborers(2 Men) 4days X 370.00 1,480.00 Ii Item 311 – Portland Cement Concrete Pavement Materials Portland Cement 10bags X 285.00 2,850.00 River Sand 1cu.m X 1,300.00 1,300.00 Gravel (11/2 Ømax) 2cu.m X 1,300.00 2,600.00 6pcs 2”x8”x12’ Coco Lumber( Barricades) 30.00 X 128bdft. 3,840.00 6pcs 2”x2”x12’ Coco Lumber( Barricades) 32.00 X 32bdft. 960.00 4’ Cw Nails 1kg X 70.00 70.00 3”cw Nails 1kg X 75.00 75.00 Empty Gallon 2pcs X 180.00 360.00 Manpower Project Engineer 3days X 500.00 1,500.00 Mason(2 Men) 6days X 450.00 2,700.00 Carpenters(2 Men) 6days X 450.00 2,700.00 Laborers(6 Men) 18days X 370.00 6,660.00 Equipment Bagger Mixer(1 Unit) 1day X 200.00 200.00 Fuel Gasoline 40l X 80.00 3,200.00 Estimated Amount: 109,570.00
Closing Date30 Jan 2025
Tender AmountPHP 130 K (USD 2.2 K)
BARANGAY RIOTUBA, BATARAZA, PALAWAN Tender
Civil And Construction...+1Road Construction
Philippines
Details: Description Concreting Of Road At Sotea To Tamina Residents, Sitio Kayasyasan, Brgy. Rio Tuba, Bataraza Palawan Description Of Works: Item 100. Clearing And Grubbing: Quantity = 600 Sq.m. A. Materials : ----none---- B. Equipment Rental : No. Of Equipment : Type One (1) Bulldozer @php One (1) Chainsaw C. Manpower : ----none---- Note: Operator & Helper Include In Per Hour Rate Of Equipment. Item 104. Embankment: Quantity = 57. 44 Cu.m Mixed A. Materials: Description Quantity Embankment Materials 57.44 B. Equipment Rental: No. Of Equipment: Type One (1) Road Grader @php One (1) Road Roller Item 201. Aggregates Base Course: Quantity = 81.2 Cu.m. A. Equipment Rental: Type Of Equipment: One (1) Road Grader @ Php One (1) Road Roller B. Manpower: No. Designation One (1) Foreman Two (2) Helper C. Materials: 81.2 Cu.m. Mixed Gravel @php Item 311. Portland Cement Concrete Pavement = 406 Sq. M Estimated Output Per Day = 30 Sq. No. Of Days = 406sq.m/30sq.m.= 13.5 A. Equipment: No. Of Equipment Type One (1) Water Truck One (1) Concrete Vibrator One (1) Concrete Bagger Mixer B. Manpower: Using One Bagger Mixer No. Designation One (1) Foreman One (1) Leadman Two (2) Mason/carpenter Eight (8) Laborers C. Materials: Description Quantity Cement 1120 Gravel 110 Sand 56 #16 Tie Wire 15 16mmø Rsb 85 2"x8"x12' Lumber 72 2"x2"x12' Lumber 45 Ass. C.w. Nail 26 Asphalt Filler 10 Construction Pails 16 Empty Drum 8 Blue Sheet 50 Gasoline 50 Diesel 42 Miscellaneous: Description Quantity Tarpaulin With Frame 2 Garden Hose 1 Caution Tape 1 Shovel 8 Schedule Of Activities: Posting And Issuance Of Bids = February 4, 2025 Pre-bid Conference = February 12, 2025 Deadline Of Submission And Opening Of Bids = February 24, 2025 Cost Of Bid Documents = Php 5,000.00
Closing Date24 Feb 2025
Tender AmountPHP 1.4 Million (USD 24.1 K)
Northern Railway - NR Tender
Services
Housekeeping Services
Ireps
India
Details: Description:- (a) Professional Housekeeping Of All Offices And Other Buildings And Premises And All
area Including Orh & Subordinate Rest House,cpm Office Campus (new And Old Cpm Building)
including Dy Cee/c Campus Specified In The Additional Special Conditions By Providing Manpower
comprisingof Atleast 5 Personnel For Cleaning Including Vacuum Cleaning, Sweeping, Mopping,
dusting Of Interiors And Exteriors Of All Office Buildings And Office Chambers Including Floors, Walls,
ceilings, Doors And Windows, Corridors, Staircases, Passages, Wash Basins, Toilets, Railings, Fixtures
and Fittings, Lights, Fans, Gates, Parking Area, Common Area Etc. Complete Strictly At Specified Timings
andfrequenciesasspecifiedintheadditionalspecialconditionsbyemployingalltheinputs,
procedure,equipment,tools,cleaningagents,liquidsoap,phenoil,naphthaleneballsetc.as
mentioned In The Additional Special Conditions Of The Contract As Directed By The Engineer-in-charge
or His Representative. Contractor To Provide Overcoat Dark Blue And Shoes To The Staff Deputed For The
work Notes (i) Labour Laws And Minimum Wages As Circulated By The Ministry Of Labour Should Be
followed And Payment To The Personnel Shall Be Made Accordily By Contractor. (ii) The Contractor Shall
ensure To Maintain Adequate Number Of Manpower At All Times And Also Maintain A Pool Of Suitable
standbymanpowerfordeployementincaseofrestandrelieftothedeployedmanpower(iii)
contractor Has To Provide Two Set Of Uniform Prescribed Per Year Along With Photo Identity Card And
name Badge Without Fail. Note; Non-deployment Of Minimum Personnel Will Lead To Penalty As Per
terms And Conditions. Professional Housekeeping Of All Area Of Orh & Subordinate Rest House Of
area 600 Sqm( 2 Times A Day ). Payment Will Be Made For 600 Sqm/day Based On Actual Work Done.
Closing Date7 Jan 2025
Tender AmountINR 747.8 K (USD 8.6 K)
Municipality Of Argao, Cebu Tender
Manpower Supply
Philippines
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 1.00 4.50 Low Bed Trailer Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 Each Dpwh Standard Output Per Day (opd)= 2.00 Each 1.00 Each B.5 Direct Cost: A. Materials: 32.00 Sq. Ft. A. Tarpaulin (4' X 8') 37.00 Bdft B. Lumber Coco 1.00 Kg C. Common Nails Assorted 1.00 Pc D. Plywood Marine (3/16" X 4' X 8') B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 Ls Dpwh Standard Output Per Day (opd)= 1.00 Ls 1.00 Ls B.7(2) Direct Cost: A. Materials: 3890.48 Man-days A. Safety Helmet 3265.00 Man-days B. Safety Shoes 3308.00 Man-days C. Safety Vest 3268.00 Man-days D. Working Gloves 28.00 Man-days F. Eye Goggles B. Manpower: Number Of Days 3.00 1.00 A. Safety Practitioner/officer (part Time) 15.00 1.00 B. First Aider C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 803(1)a Structure Excavation (common Soil) Quantity 60.00 M3 Dpwh Standard Output Per Day (opd)= 20.00 M3 60.00 M3 Structure Excavation (common Soil) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. Backhoe (0.80 Mᶾ) 1.00 2.00 B. Dumptruck (12 Ydᶾ) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(1)a Embankment From Structure Excavation Quantity 64.50 M3 Dpwh Standard Output Per Day (opd)= 9.84 M3 64.50 M3 Embankment From Structure Excavation Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.75 1.00 A. Plate Compactor (5 Hp) 0.75 1.00 B. Backhoe (0.80 M3) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 100(1) Cleaning & Grubbing (with Stripping) Quantity 0.03 Ha Dpwh Standard Output Per Day (opd)= 0.05 Ha 0.03 Ha Cleaning & Grubbing (with Stripping) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 2.00 A. Dump Track (12 Yd3) 1.00 1.00 B. Payloader ( 1.50 M3) 1.00 1.00 C. Bulldozer, D^h Series Ii Psds/ Dd) Number Of Hours 1.00 1.00 Construction Foreman 1.00 2.00 Skilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 201.00 Aggregate Base Course Quantity 8.16 M³ Dpwh Standard Output Per Hour (oph)= 50.00 M³ 8.16 M³ Aggregate Base Course Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 Motorized Road Grader (140hp) G170a 1.00 1.00 Vibrator Roller (10 Mt) Sd 100dc 0.25 1.00 Water Truck/pump (16000l) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 311(1) A1 Pcc Pavement (plain) -conventional Method, 150mm Thk Quantity 408.00 M2 Dpwh Standard Output Per Hour (oph)= 107.330 M2 408.00 M2 Pcc Pavement (plain) -conventional Method, 150mm Thk Direct Cost: A. Materials: 0.39 Kg Reinforcing Steel Bar 0.29 L Curing Compound 0.12 L Asphalt Sealant 0.46 M Steel Form (rentals) 0.11 M³ Sand 0.20 M³ Gravel 1.90 Bag Cement 0.00 Pc Concrete Saw (diamond Blade 14" Ø) 0.01 M Pipe Sleeve, 1" Ø 0.01 L Grease/tar B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 4.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 4.00 Transit Mixer (5 M3) 1.00 2.00 Concrete Vibrator 1.00 1.00 Concrete Batch Plant 1.00 1.00 Payloader (1.5m3) 1.00 1.00 Concrete Screeder (5 Hp) 1.00 1.00 Water Truck/pump (16000l) 1.00 1.00 Concrete Saw (7.5 Hp) , 14" Blade Ø 0.10 1.00 Bar Cutter, Single Phase Minor Tools (5% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)
Closing Date17 Feb 2025
Tender AmountPHP 999.4 K (USD 17.2 K)
Municipality Of Argao, Cebu Tender
Manpower Supply
Philippines
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 1.00 6.00 Low Bed Trailer Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 Each Dpwh Standard Output Per Day (opd)= 2.00 Each 1.00 Each B.5 Direct Cost: A. Materials: 32.00 Sq. Ft. A. Tarpaulin (4' X 8') 37.00 Bdft B. Lumber Coco 1.00 Kg C. Common Nails Assorted 1.00 Pc D. Plywood Marine (3/16" X 4' X 8') B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 Ls Dpwh Standard Output Per Day (opd)= 1.00 Ls 1.00 Ls B.7(2) Direct Cost: A. Materials: 3890.48 Man-days A. Safety Helmet 3265.00 Man-days B. Safety Shoes 3308.00 Man-days C. Safety Vest 3268.00 Man-days D. Working Gloves 28.00 Man-days F. Eye Goggles B. Manpower: Number Of Days 3.00 1.00 A. Safety Practitioner/officer (part Time) 15.00 1.00 B. First Aider C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 100(1) Cleaning & Grubbing Quantity 0.03 Ha Dpwh Standard Output Per Day (opd)= 0.05 Ha 0.03 Ha Cleaning & Grubbing Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 2.00 A. Dump Track (12 Yd3) 1.00 1.00 B. Payloader ( 1.50 M3) 1.00 1.00 C. Bulldozer, D^h Series Ii Psds/ Dd) Number Of Hours 1.00 1.00 Construction Foreman 1.00 2.00 Skilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 201.00 Aggregate Base Course Quantity 26.52 M³ Dpwh Standard Output Per Hour (oph)= 50.00 M³ 26.52 M³ Aggregate Base Course Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 Motorized Road Grader (140hp) G170a 1.00 1.00 Vibrator Roller (10 Mt) Sd 100dc 0.25 1.00 Water Truck/pump (16000l) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 311(1) A1 Pcc Pavement (plain) -conventional Method, 150mm Thk Quantity 408.00 M2 Dpwh Standard Output Per Hour (oph)= 107.33 M2 408.00 M2 Pcc Pavement (plain) -conventional Method, 150mm Thk Direct Cost: A. Materials: 0.39 Kg Reinforcing Steel Bar 0.29 L Curing Compound 0.12 L Asphalt Sealant 0.46 M Steel Form (rentals) 0.11 M³ Sand 0.20 M³ Gravel 1.90 Bag Cement 0.00 Pc Concrete Saw (diamond Blade 14" Ø) 0.01 M Pipe Sleeve, 1" Ø 0.01 L Grease/tar B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 4.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 4.00 Transit Mixer (5 M3) 1.00 2.00 Concrete Vibrator 1.00 1.00 Concrete Batch Plant 1.00 1.00 Payloader (1.5m3) 1.00 1.00 Concrete Screeder (5 Hp) 1.00 1.00 Water Truck/pump (16000l) 1.00 1.00 Concrete Saw (7.5 Hp) , 14" Blade Ø 0.10 1.00 Bar Cutter, Single Phase Minor Tools (5% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)
Closing Date17 Feb 2025
Tender AmountPHP 999.9 K (USD 17.2 K)
Mangalore Refinery And Petrochemicals Limited Tender
GEM
India
Description: CATEGORY: Custom Bid for Services - MRPL tender 3900001482 item co
1043635 Radiography Of Weld Seams Per Inch In Length Of
Film Exposed 3 inch wide as per SOW unpriced bid and in G
one lump sum rate including GST to be quoted considering
Inches , Custom Bid for Services - item code 1043636
Radiography Of Weld Seams Per Inch In Length Of C4 Film
Exposed 4 inch wide as per SOW unpriced bid and in GEM o
lump sum rate including GST to be quoted considering 200
Inches , Custom Bid for Services - item code 1043637
Radiography Of Weld Seams C4 Film Exposed For Small Bor
Piping as per SOW unpriced bid and in GEM one lump sum r
including GST to be quoted considering 1500 numbers , Cus
Bid for Services - item code 1043638 Radiography By Expos
C4 Film as per SOW unpriced bid and in GEM one lump sum
including GST to be quoted considering 40 numbers , Custo
for Services - item code 1043639 Radiographic examination
weldsper square inch of C4 film exposed as per SOW unpric
and in GEM one lump sum rate including GST to be quoted
considering 1000 square inches , Custom Bid for Services - i
code 1043680 manpower and mobilization charge from ven
place to MRPL as per SOW unpriced bid and in GEM one lum
sum rate including GST to be quoted considering 12 Per
Occasions , Custom Bid for Services - item code 1046328 u
mobilization rate on daily basis as per SOW unpriced bid an
GEM one lump sum rate including GST to be quoted conside
120 numbers
Closing Date6 Feb 2025
Tender AmountRefer Documents
Bapco Refining Tender
Electrical and Electronics...+1Electrical Works
Corrigendum : Closing Date Modified
Bahrain
Details: The Work Involves Providing Electrical Services Across Various Company Areas Including The Refinery Sitra, Marketing Terminal Wharf Awali, Gas Distribution Network And The Bmp Key Activities Include Supplying Manpower For Preventive Predictive And Corrective Maintenance As Well As Handling Turnaround And Inspection Works For Scheduled And Emergency Shutdowns The Contract Also Covers One Off Jobs For Corrective Maintenance Or Project Work Including Labor And Materials Additional Activities Include Supplying Rental Equipmentsubcontracting Specialized Technical Support From Oems Maintaining And Installing Electrical Assets Fabricating Supports For Electrical Devices And Performing Minor Civil Works Related To Electrical Assets These Requirements Will Be Managed Through Purchase Agreements And Relevant Purchase Orders The Contractors Personnel Will Work Under The Companys Direction But Will Be Responsible For The Safety Quality Quantity And Accuracy Of Their Work
Closing Date12 Jan 2025
Tender AmountRefer Documents
Center For Health Development Region Vi Tender
Electronics Equipment...+1Electrical and Electronics
Philippines
Details: Description Qty Unit "articles/description " Physical Set-up & Led Wall With Lights And Sounds For The Local Health System Awards, To Wit; 1 Pc Led Wall/screen Specifications: Personnel To Assist/operate The Equipment 10' X 16.6' Screen Others: Other Neccesary Accessories, Equipment And Manpower For The Operation Of The Led Wall Set Up And Tested 1 Day Before The Activity Other Overhead Expenses Such As Electrivity Consumption Cost, Etc Decorations For The Whole Venue, To Include: Stage Entrance Ceiling Table Tops Backdrop And Lighting Lei Photo Booth To Include The Following: Unlimited Shots Lightings Props Dslr Camera Other Equipment And Accessories Such As Photo Printer, Desktop Computer, Etc Date Of Activity: March 28, 2025
Closing Date14 Feb 2025
Tender AmountPHP 100 K (USD 1.7 K)
Municipality Of Argao, Cebu Tender
Manpower Supply
Philippines
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 6.00 1.00 A. Backhoe (0.80 Mᶾ) 6.00 1.00 B. Dumptruck (12 Ydᶾ) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1 Ls 1.00 L.s. Project Billboard/signboard Direct Cost: A. Materials: 64.00 Sq.ft. A. Tarpaulin (4' X 8') 37.00 Bd.ft. B. Lumber Coco 1.00 Kg C. Common Nails Assorted 2.00 Sheets D. Plywood Marine (1/4" X 4' X 8') B. Manpower: Number Of Hours 4.00 1.00 A. Construction Foreman 4.00 1.00 B. Skilled Laborer 4.00 2.00 C. Unskilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Occupational Safety And Health Program Direct Cost: A. Materials: 2769.00 Man-days A. Safety Helmet 2769.00 Man-days B. Safety Shoes 2769.00 Man-days D. Working Gloves 1.00 Set E. First Aid Kit B. Manpower: Number Of Days 14.00 1.00 A. Safety Practitioner/officer (part Time) C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.3 Permits And Clearances Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Permits And Clearances Direct Cost: A. Materials: 1.00 L.s. Permits And Other Clearances - Building Permit Processing Fees B. Manpower: C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 803(1)a Structure Excavation (common Soil) Quantity 43.41 M3 Dpwh Standard Output Per Hour (oph)= 20.00 M3 43.41 M3 Structure Excavation (common Soil) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. Backhoe (0.80 Mᶾ) 1.00 2.00 B. Dumptruck (12 Ydᶾ) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(1)a Embankment From Structure Excavation Quantity 39.57 M3 Dpwh Standard Output Per Hour (oph)= 9.84 M3 39.57 M3 Embankment From Structure Excavation Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.75 1.00 A. Plate Compactor (5 Hp) 0.75 1.00 B. Backhoe (0.80 M3) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(4) Gravel Bedding Quantity 3.81 M3 Dpwh Standard Output Per Day (opd)= 1.20 M3 3.81 M3 Gravel Bedding Direct Cost: A. Materials: 1.05 M3 A. Gravel Bedding (g1)(w/5% Shrinkage Factor) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Unskilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c2 "structural Concrete (footing, Slab On Fill)" Quantity 15.03 M3 Dpwh Standard Output Per Day (opd)= 0.357 M3 15.03 M3 " Structural Concrete (footing, Slab On Fill)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c3 "structural Concrete (footing Tie Beam, Wall Footing)" Quantity 2.56 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 2.56 M3 " Structural Concrete (footing Tie Beam, Wall Footing)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c4 "structural Concrete (columns)" Quantity 5.42 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 5.42 M3 " Structural Concrete (columns)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c5 "structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Quantity 3.90 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 3.90 M3 " Structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c6 "structural Concrete (suspended Slab)" Quantity 2.09 M3 Dpwh Standard Output Per Day (opd)= 0.270 M3 2.09 M3 " Structural Concrete (suspended Slab)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 902(1) "reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Quantity 3,947.39 Kg Dpwh Standard Output Per Day (opd)= 143.44 Kg 3947.39 Kg " Reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Direct Cost: A. Materials: 1.00 Kg A. Deformed Reinforcing Steel - G40 0.02 Kg B. #16galvanized Iron Wire C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: 0.50 1.00 A. Bar Cutter 0.50 1.00 B. Bar Bender Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 903 (2) Formworks And Falseworks Quantity 56.65 M2 Dpwh Standard Output Per Day (opd)= 3.24 M2 56.65 M2 Formworks And Falseworks Direct Cost: A. Materials: 0.35 Pcs A. Ordinary Plywood - 3 Uses 7.19 Bd Ft B. Good Lumber - 3 Use 0.21 Kg C. Assorted Common Wire Nail D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer Removal 0.41 1.00 A. Construction Foreman 0.41 6.00 B. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1046.00 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Quantity 188.21 M2 Dpwh Standard Output Per Day (opd)= 3.825 M2 188.21 M2 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Direct Cost: A. Materials: 13.00 Pc A. 100 Mm Thk Chb (non-load Bearing) 0.53 Bag B. Cement 0.04 Cu.m C.sand 3.24 Kg D. Reinforcing Steel 0.05 Kg E. #16 Tie Wire B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: 1.00 1.00 A. One-bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1016(1)a Waterproofing Cement Base Quantity 12.54 M2 Dpwh Standard Output Per Day (opd)= 1.875 M2 12.54 M2 Waterproofing Cement Base Direct Cost: A. Materials: 1.05 M2 A. Cement-based Waterproofing B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)b Structural Steel Roof Truss Quantity 507.84 Kg Dpwh Standard Output Per Day (opd)= 85.00 Kg 507.84 Kg Structural Steel Roof Truss Direct Cost: A. Materials: 1.00 Kg A. Structural Steel (channel Bar A36) 0.01 Kg B. Acetylene 0.02 Kg C. Oxygen 0.02 Kg D. Welding Rod E. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer Erection 0.49 3.00 A. Skilled Laborer 0.49 3.00 B. Unskilled Laborer C. Equipment And Water: 0.75 1.00 A. Welding Machine 0.25 1.00 B. Cutting Outfit 0.49 1.00 C. Truck Mounted Crane (20-25 Mt) Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)c Structural Steel Purlins Quantity 200.46 Kg Dpwh Standard Output Per Day (opd)= 90.45 Kg 200.46 Kg Structural Steel Purlins Direct Cost: A. Materials: 1.05 Kg A. Structural Steel Framing Including Cross 0.02 Kg B. Acetylene C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: 1.00 2.00 A. Welding Machine Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1014.00 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Quantity 48.00 M2 Dpwh Standard Output Per Day (opd)= 2.769 M2 48.00 M2 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Direct Cost: A. Materials: 1.00 M A. Prepainted Metal Sheets (rib Type, Long Span, 0.427mm Thk. 10.00 Pc B. Tek Screw C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(1) Fabricated Metal Roofing Accessory (flashings) Quantity 54.76 M Dpwh Standard Output Per Day (opd)= 10.00 M 54.76 M Fabricated Metal Roofing Accessory (flashings) Direct Cost: A. Materials: 1.05 M A. Flashings (bended) 19.00 Pc B. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(2)c Fabricated Metal Roofing Accessory (gutter) Quantity 7.76 M Dpwh Standard Output Per Day (opd)= 11.80 M 7.76 M Fabricated Metal Roofing Accessory (gutter) Direct Cost: A. Materials: 1.05 M A. Gutter (0.4 Mm) 3.00 Pc B. 12" X 1" Plain Gi Strap 16.00 Pc C. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1038(1) "reflective Insulation" Quantity 50.00 M2 Dpwh Standard Output Per Day (opd)= 5.56 M2 50.00 M2 " Reflective Insulation" Direct Cost: A. Materials: 1.00 M2 A. Reflective Insulation B. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1100(10) Conduit Works, Boxes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= "1.00 I.s." 1.00 I.s. Conduit Works, Boxes And Fittings Direct Cost: A. Materials: 1.00 Length A. 25 Mm Ø X 3.00 M Rsc Pipe 80.00 Length B. 15 Mm Ø X 3.00 Mm Pvc Pipes 10.00 Pcs C. 15mm Ø Pvc Coupling 30.00 Pcs D. 15mm Ø Pvc Elbow 25.00 Pcs E. Utility Box 30.00 Pcs F. Junction Box 1.00 Pcs G. 25mm Ø Entrance Cap H. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 47.39 1.00 A. Construction Foreman 47.39 1.00 B. Skilled Laborer 47.39 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1101(33) Wires And Wiring Devices Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= 1.00 I.s. 1.00 I.s. Wires And Wiring Devices Direct Cost: A. Materials: 200.00 M A.3.5 Mm2 Electric Wire Thhn 160.00 M B.5.5 Mm2 Electric Wire Thhn 25.00 M C. 8.00 Mm2 Electric Wire (thhn) 1.00 Set D. Single-gang Switch 4.00 Set E. Two-gang Switch 2.00 Set F. Three-gang Switch 13.00 Set G. Duplex Convenience Outlet H. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 28.05 1.00 A. Construction Foreman 28.05 1.00 B. Skilled Laborer 28.05 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1102(1) Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Quantity 1.00 Set Dpwh Standard Output Per Day (opd)= 1 Set 1.00 Set Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Direct Cost: A. Materials: 1.00 Set A. Panel Board With Main Breaker And 8 Branches 50 Amp - 200 Amp 1.00 Pcs B. 60 Amp. Plug-in Breaker 2.00 Pcs B. 30 Amp. Plug-in Breaker 2.00 Pcs B. 20 Amp. Plug-in Breaker 2.00 Pcs B. 15 Amp. Plug-in Breaker B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 5.50 1.00 A. Construction Foreman 5.50 1.00 B. Skilled Laborer 5.50 2.00 C. Unskilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1001 (8) Sewer Line Work Quantity 1.00 Ls Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 Ls Sewer Line Work Direct Cost: A. Materials: 7.00 Lengths A. 50 Mm Ø Pvc Pipe,series 1000 3.00 Lengths B. 100 Mm Ø Pvc Pipe, Series 1000 8.00 Pcs C. Pvc 45 Deg. (3mm Bend X 50mm) 2.00 Pcs D. Pvc 45 Deg. (3mm Bend X 101mm) 2.00 Pcs E. Pvc 87.5 Deg. (6mm Bend X 101mm) 1.00 Pcs F. Pvc 45 Deg. Single Branch, Wye (101mm X 101mm) 1.00 Pcs G. Pvc 87.5 Deg. Single Branch, Seep, Tee (101mm X 50mm) 6.00 Pcs H. Pvc Coupling (50mm D) 2.00 Pcs I. Pvc Coupling3 (101mm D) 1.00 Pcs J. Pvc P-trap W/ Plug & Sealing Rings (50mm) 1.00 Pcs K. Pvc P-trap W/ Plug & Sealing Rings (101mm) 2.00 Pcs L. Pvc Cleanout W/ Plug & Sealing Rings (101mm) M. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 10.00 1.00 A. Construction Foreman 10.00 1.00 B. Skilled Laborer 10.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1001 (9) Storm Drainage And Downspout Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Storm Drainage And Downspout Direct Cost: A. Materials: 8.00 Lengths A. 75 Mm Ø Pvc Pipe,series 1000 9.00 Ea B. Pvc 45 Deg. (3mm Bend X 76mm) 5.00 Ea C. Pvc Coupling (76mm D) D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 8.00 1.00 A. Construction Foreman 8.00 1.00 B. Skilled Laborer 8.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1002(6) Cold Waterline Pipes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Day (opd)= "1.00 I.s." 1.00 I.s. Cold Waterline Pipes And Fittings Direct Cost: A. Materials: 5.00 Lengths A.13 Mm Ø X 4.00 M (ppr) Pipe, Pn 20 5.00 Pcs B.13 Mm Ø Ppr Elbow - Threaded 10.00 Pcs C.13 Mm Ø Ppr Elbow 10.00 Pcs D.13 Mm Ø Ppr Coupling 2.00 Pcs E.13 Mm Ø Gate Valve 2.00 Pcs F.13 Mm Ø Ppr Union 5.00 Pcs G.13 Mm Ø Ppr Tee H. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 6.65 1.00 A. Construction Foreman 6.65 1.00 B. Skilled Laborer 6.65 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)c Painting Works (metal Painting) Quantity 58.55 M2 Dpwh Standard Output Per Day (opd)= 2.00 M2 58.55 M2 Painting Works (metal Painting) Direct Cost: A. Materials: 0.05 Gal A. Red Oxide Primer 0.10 Gal B. Enamel Paint 0.25 L C. Paint Thinner D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 1.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)
Closing Date20 Feb 2025
Tender AmountPHP 1.4 Million (USD 25.9 K)
Municipality Of Argao, Cebu Tender
Manpower Supply
Philippines
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 1.00 8.00 Low Bed Trailer Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 Each Dpwh Standard Output Per Day (opd)= 2.00 Each 1.00 Each B.5 Direct Cost: A. Materials: 32.00 Sq. Ft. A. Tarpaulin (4' X 8') 37.00 Bdft B. Lumber Coco 1.00 Kg C. Common Nails Assorted 1.00 Pc D. Plywood Marine (3/16" X 4' X 8') B. Manpower: Number Of Days 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 Ls Dpwh Standard Output Per Day (opd)= 1.00 Ls 1.00 Ls B.7(2) Direct Cost: A. Materials: 3890.48 Man-days A. Safety Helmet 3265.00 Man-days B. Safety Shoes 3308.00 Man-days C. Safety Vest 3268.00 Man-days D. Working Gloves 28.00 Man-days F. Eye Goggles B. Manpower: Number Of Days 3.00 1.00 A. Safety Practitioner/officer (part Time) 15.00 1.00 B. First Aider C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 100(1) Cleaning & Grubbing (with Stripping) Quantity 0.02 Ha Dpwh Standard Output Per Day (opd)= 0.05 Ha 0.02 Ha Cleaning & Grubbing (with Stripping) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 2.00 A. Dump Track (12 Yd3) 1.00 1.00 B. Payloader ( 1.50 M3) 1.00 1.00 C. Bulldozer, D^h Series Ii Psds/ Dd) Number Of Hours 1.00 1.00 Construction Foreman 1.00 2.00 Skilled Laborer C. Equipment And Water: Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 201.00 Aggregate Base Course Quantity 6.18 M³ Dpwh Standard Output Per Hour (oph)= 50.00 M³ 6.18 M³ Aggregate Base Course Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 Motorized Road Grader (140hp) G170a 1.00 1.00 Vibrator Roller (10 Mt) Sd 100dc 0.25 1.00 Water Truck/pump (16000l) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 311(1) A1 Pcc Pavement (plain) -conventional Method, 150mm Thk Quantity 412.00 M2 Dpwh Standard Output Per Hour (oph)= 107.330 M2 412.00 M2 Pcc Pavement (plain) -conventional Method, 150mm Thk Direct Cost: A. Materials: 0.39 Kg Reinforcing Steel Bar 0.29 L Curing Compound 0.12 L Asphalt Sealant 0.46 M Steel Form (rentals) 0.11 M³ Sand 0.20 M³ Gravel 1.90 Bag Cement 0.00 Pc Concrete Saw (diamond Blade 14" Ø) 0.01 M Pipe Sleeve, 1" Ø 0.01 L Grease/tar B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 4.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 4.00 Transit Mixer (5 M3) 1.00 2.00 Concrete Vibrator 1.00 1.00 Concrete Batch Plant 1.00 1.00 Payloader (1.5m3) 1.00 1.00 Concrete Screeder (5 Hp) 1.00 1.00 Water Truck/pump (16000l) 1.00 1.00 Concrete Saw (7.5 Hp) , 14" Blade Ø 0.10 1.00 Bar Cutter, Single Phase Minor Tools (5% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)
Closing Date17 Feb 2025
Tender AmountPHP 999.7 K (USD 17.2 K)
8671-8680 of 9297 archived Tenders