Manpower Tenders
Manpower Tenders
Department Of Agriculture Tender
Civil And Construction...+1Civil Works Others
Philippines
Details: Description Section I. Invitation To Bid Da8-infra-2025-10 (pr No. Bt-25-infra-rice-39835-0008) 1. The Department Of Agriculture-regional Field Office No. 8, Through The Rice 2025-current Fund Intends To Apply The Sum Of Six Million One Hundred Thirty-eight Thousand Six Hundred Ten Pesos And 53/100 Only (p6,138,610.53) Being The Approved Budget For The Contract (abc) To Payment For The Contract For “supply Of Labor And Materials For The Construction Of Warehouse Located At Brgy. San Pablo, Tabon-tabon, Leyte.” Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture-regional Field Office No. 8, Undertakes The Bidding Of This Procurement Project As “short-of-award.” Hence, The Notice Of Award To The Winning Bidder Shall Be Issued After Enactment By The Congress Of The General Appropriation Act (gaa) For 2025. 3. The Department Of Regional Field Office Viii Now Invites Bid For The Above Procurement Project. Completion Of Works Is Required Within One Hundred Eighteen (118) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii: Instruction To Bidders Qty Uom Desription Total Cost Supply Of Labor And Materials For The Construction Of Warehouse Located At Brgy. San Pablo, Tabon-tabon, Leyte P6,138,610.53 96 Sq.ft Signboard/billboard 1 I.s. Mobilization/demobilization And Temporary Shelter 600 Sq.m. Clearing And Grubbing 82.77 Cu.m. Structure Excavation 371 Cu.m. Embankment 8927.65 Kgs. Reinforcing Steel 130.12 Cu.m. Reinforced Concrete 1 I.s. Formworks And Falseworks 587.78 Sq.m. Masonry Works 1185.34 Sq.m. Cement Plaster Finish 348.18 Sq.m. Metal Structures 348.18 Sq.m. Prepainted Metal Roofing 61 Sets Aluminum Screen And Aluminum Glass Windows 1 Sets Doors 2 Sets Sliding Steel Door 1 I.s. Conduits, Boxes & Fittings 1 I.s. Wires & Wiring Devices 1 I.s. Power Load Center Switch Gear & Panel Board 13 Sets Lighting Fixtures 1 I.s. Solar Panel System 1185.34 Sq.m. Paintings 1 Lot Brass Marker Terms And Conditions: A During The Opening Of Bids, Bidders Shall: 1. Submit Certificate Of Project Site Inspection Issued By Farmer’s Association Or Barangay Officials Or Affidavit Of Site Inspection; 2. Submit Certificate Of Compliance To The Attached Drawings Duly Signed By The Bidder’s Authorized Representative And Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; B All Participating Bidder Must Comply With Section B Of Dpwh D.o. No. 197 Series Of 2016, Particularly In The Computation Ocm & Profit Of The Bid Amount. Use 12% For Vat Mark-up C During Post-qualification Evaluation 1. In Case Of Recomputed Bid, Bidder Shall Submit Its Revised Cost Estimates 2. Submit Pert/cpm And S-curve 3. Construction Methods 4. Manpower Schedule 5. Major Equipment Schedule 6. Provide Contractor's All Risk Insurance (cari) 7. Submit Plans, Design, And Specification Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; D Winning Bidder Shall: 1. Commence Construction Works Within Seven (7) Days Upon Receipt Of Notice To Proceed (ntp); 2. Complete The Construction Within 118 Calendar Days; 3. Provide Necessary Tools For The Satisfactory Completion Of The Project; 4. Assume Full Responsibility From The Time Project Construction Commences Up To The Final Acceptance By Darfo 8 And Shall Be Held Responsible For Any Damage In Part Or In Whole Except Those Occasioned By Force Majeure; 5. Assign A Project Engineer (either Licensed Agricultural Engineer Or Civil Engineer) That Will Oversee The Daily Construction Activities On Site; 6. Comply With The Quality Control Program (qcp) Schedule Of Minimum Testing Requirements Of The End-user; 7. Submit Material Test Report Or Its Equivalent Standard Certificate For Aggregate (sand & Gravel), And Cement 8. Submit Material Test Result From Accredited Testing Laboratory For Concrete, And Reinforcing Bar With Geotagged Photos, If Applicable; 9. Attend Pre-construction Meeting. 10. In Case Of Time Extension Due To Unworkable Weather Condition, Submit The Request With Pag-asa Weather Report And On-site Weather Chart Within The Succeeding Month. 11. Secure And Facilitate The Necessary Permits Required For The Project Implementation. 12. Strictly Observe Construction Safety Rules And Health Program Approved By Department Of Labor And Employment (dole) During Project Implementation. E Any Delay In The Project Completion Shall Be Subjected To Liquidated Damages Equivalent To At Least 1/10 Of 1% Of The Cost Of The Unperformed Portion Of The Works For Everyday Of Delay F Be Paid Through Partial Billing Based On Validated/verified Statement Of Work Accomplishment (swa) With Geo-tagged Photos On Major Works (before, During, And After) And Inspection Report By The Da-rfo8 Inspectorate Team. 1. At Least 30% Of The Physical Accomplishment; 2. At Least 50% Of The Physical Accomplishment; 3. At Least 75% Of The Physical Accomplishment; 4. 100% Of The Physical Accomplishment, Testing And Acceptance Of The Project G Advance Payment (maximum Of 15%) Will Be Granted Upon Submission Of The Following Requirements: 1. Advance Payment Bond By The Bidder 2. On-site Evaluation Report By The Da Project Engineer H Winning Bidder Shall Submit A Snapshot Of A Business Bank Account (preferably Landbank) To Effect Payment. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 5. Interested Bidders May Obtain Further Information From Department Of Agriculture – Regional Field Office 8 And Inspect The Bidding Documents At The Address Given Below During Office Hours, From 8:00 Am To 5:00 Pm 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 12, 2024 To January 08, 2025 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents Amounting To Ten Thousand Pesos Only (p10,000.00), Pursuant To The Latest Guidelines Issued By The Gppb. 7. The Department Of Agriculture-rfo 8 Will Hold A Pre-bid Conference On December 19, 2024 9:00 Am At Bac Office, Da-rfo8, Kanhuraw Hill, Tacloban City Through Face To Face Or Videoconferencing/webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 8. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before January 08, 2025, 9:00 Am (bac-secretariat Time). Late Bids Shall Not Be Accepted. 9. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 10. Bid Opening Shall Be On January 08, 2025, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity Either Physically Or Through Videoconferencing Via Google Meet. 11. The Department Of Agriculture-rfo 8 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Da Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 13. For Further Information, Please Refer To: Martins A. Alde Head, Bac-secretariat Department Of Agriculture, Regional Field Office-8 Kanhuraw Hill, Tacloban City Darfo8.bacsec@gmail.com Mobile No. 09061694318 Easternvisayas.da.gov.ph 14. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.philgeps.gov.ph Or Easternvisayas.da.gov.ph Approved By: (sgd.) Larry U. Sultan, Jd Chairman, Bids And Awards Committee
Closing Date8 Jan 2025
Tender AmountPHP 6.1 Million (USD 105.7 K)
Department Of Agriculture Tender
Civil And Construction...+2Civil Works Others, Construction Material
Philippines
Details: Description Section I. Invitation To Bid Da8-infra-2025-11 (pr No. Bt-25-infra-rice-39835-0012) 1. The Department Of Agriculture-regional Field Office No. 8, Through The Rice 2025-current Fund Intends To Apply The Sum Of Six Million Four Hundred Thirty-five Thousand Six Hundred Sixteen Pesos And 19/100 Only (p6,435,616.19) Being The Approved Budget For The Contract (abc) To Payment For The Contract For “supply Labor And Materials For The Construction Of Warehouse Located At Brgy. San Jose, Ormoc City.” Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture-regional Field Office No. 8, Undertakes The Bidding Of This Procurement Project As “short-of-award.” Hence, The Notice Of Award To The Winning Bidder Shall Be Issued After Enactment By The Congress Of The General Appropriation Act (gaa) For 2025. 3. The Department Of Regional Field Office Viii Now Invites Bid For The Above Procurement Project. Completion Of Works Is Required Within One Hundred Twenty (120) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii: Instruction To Bidders Qty Uom Desription Total Cost Supply Labor And Materials For The Construction Of Warehouse Located At Brgy. San Jose, Ormoc City. P6,435,616.19 96 Sq.ft Signboard/billboard 1 I.s. Mobilization/demobilization And Temporary Shelter 600 Sq.m. Clearing And Grubbing 91.24 Cu.m. Structure Excavation 376 Cu.m. Embankment 9255.19 Kgs. Reinforcing Steel 123.6 Cu.m. Reinforced Concrete 1 I.s. Formworks And Falseworks 644.56 Sq.m. Masonry Works 1185.34 Sq.m. Cement Plaster Finish 348.18 Sq.m. Metal Structures 348.18 Sq.m. Prepainted Metal Roofing 1 I.s. Plumbing 15.32 Sq.m. Ceramic Tiles 10.92 Sq.m. Carpentry And Joinery Works 3 Sets Steel Windows 61 Sets Aluminum Screen And Aluminum Glass Windows 4 Sets Doors 2 Sets Sliding Steel Door 1 I.s. Conduits, Boxes & Fittings 1 I.s. Wires & Wiring Devices 1 I.s. Power Load Center Switch Gear & Panel Board 15 Sets Lighting Fixtures 1 I.s. Solar Panel System 1185.34 Sq.m. Paintings 1 Lot Brass Marker Terms And Conditions: A During The Opening Of Bids, Bidders Shall: 1. Submit Certificate Of Project Site Inspection Issued By Farmer’s Association Or Barangay Officials Or Affidavit Of Site Inspection; 2. Submit Certificate Of Compliance To The Attached Drawings Duly Signed By The Bidder’s Authorized Representative And Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; B All Participating Bidder Must Comply With Section B Of Dpwh D.o. No. 197 Series Of 2016, Particularly In The Computation Ocm & Profit Of The Bid Amount. Use 12% For Vat Mark-up C During Post-qualification Evaluation 1. In Case Of Recomputed Bid, Bidder Shall Submit Its Revised Cost Estimates 2. Submit Pert/cpm And S-curve 3. Construction Methods 4. Manpower Schedule 5. Major Equipment Schedule 6. Provide Contractor's All Risk Insurance (cari) 7. Submit Plans, Design, And Specification Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; D Winning Bidder Shall: 1. Commence Construction Works Within Seven (7) Days Upon Receipt Of Notice To Proceed (ntp); 2. Complete The Construction Within 120 Calendar Days; 3. Provide Necessary Tools For The Satisfactory Completion Of The Project; 4. Assume Full Responsibility From The Time Project Construction Commences Up To The Final Acceptance By Darfo 8 And Shall Be Held Responsible For Any Damage In Part Or In Whole Except Those Occasioned By Force Majeure; 5. Assign A Project Engineer (either Licensed Agricultural Engineer Or Civil Engineer) That Will Oversee The Daily Construction Activities On Site; 6. Comply With The Quality Control Program (qcp) Schedule Of Minimum Testing Requirements Of The End-user; 7. Submit Material Test Report Or Its Equivalent Standard Certificate For Aggregate (sand & Gravel), And Cement 8. Submit Material Test Result From Accredited Testing Laboratory For Concrete, And Reinforcing Bar With Geotagged Photos, If Applicable; 9. Attend Pre-construction Meeting. 10. In Case Of Time Extension Due To Unworkable Weather Condition, Submit The Request With Pag-asa Weather Report And On-site Weather Chart Within The Succeeding Month. 11. Secure And Facilitate The Necessary Permits Required For The Project Implementation. 12. Strictly Observe Construction Safety Rules And Health Program Approved By Department Of Labor And Employment (dole) During Project Implementation. E Any Delay In The Project Completion Shall Be Subjected To Liquidated Damages Equivalent To At Least 1/10 Of 1% Of The Cost Of The Unperformed Portion Of The Works For Everyday Of Delay F Be Paid Through Partial Billing Based On Validated/verified Statement Of Work Accomplishment (swa) With Geo-tagged Photos On Major Works (before, During, And After) And Inspection Report By The Da-rfo8 Inspectorate Team. 1. At Least 30% Of The Physical Accomplishment; 2. At Least 50% Of The Physical Accomplishment; 3. At Least 75% Of The Physical Accomplishment; 4. 100% Of The Physical Accomplishment, Testing And Acceptance Of The Project G Advance Payment (maximum Of 15%) Will Be Granted Upon Submission Of The Following Requirements: 1. Advance Payment Bond By The Bidder 2. On-site Evaluation Report By The Da Project Engineer H Winning Bidder Shall Submit A Snapshot Of A Business Bank Account (preferably Landbank) To Effect Payment. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 5. Interested Bidders May Obtain Further Information From Department Of Agriculture – Regional Field Office 8 And Inspect The Bidding Documents At The Address Given Below During Office Hours, From 8:00 Am To 5:00 Pm 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 12, 2024 To January 08, 2025 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents Amounting To Ten Thousand Pesos Only (p10,000.00), Pursuant To The Latest Guidelines Issued By The Gppb. 7. The Department Of Agriculture-rfo 8 Will Hold A Pre-bid Conference On December 19, 2024 9:00 Am At Bac Office, Da-rfo8, Kanhuraw Hill, Tacloban City Through Face To Face Or Videoconferencing/webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 8. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before January 08, 2025, 9:00 Am (bac-secretariat Time). Late Bids Shall Not Be Accepted. 9. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 10. Bid Opening Shall Be On January 08, 2025, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity Either Physically Or Through Videoconferencing Via Google Meet. 11. The Department Of Agriculture-rfo 8 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Da Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 13. For Further Information, Please Refer To: Martins A. Alde Head, Bac-secretariat Department Of Agriculture, Regional Field Office-8 Kanhuraw Hill, Tacloban City Darfo8.bacsec@gmail.com Mobile No. 09061694318 Easternvisayas.da.gov.ph 14. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.philgeps.gov.ph Or Easternvisayas.da.gov.ph Approved By: (sgd.) Larry U. Sultan, Jd Chairman, Bids And Awards Committee
Closing Date8 Jan 2025
Tender AmountPHP 6.4 Million (USD 110.8 K)
Department Of Agriculture Tender
Civil And Construction...+2Civil Works Others, Construction Material
Philippines
Details: Description Section I. Invitation To Bid Da8-infra-2025-08 (pr No. Bt-25-infra-rice-39835-0011) 1. The Department Of Agriculture-regional Field Office No. 8, Through The Rice 2025-current Fund Intends To Apply The Sum Of Six Million Four Hundred Thirty-five Thousand Six Hundred Sixteen Pesos And 19/100 Only (p6,435,616.19) Being The Approved Budget For The Contract (abc) To Payment For The Contract For “supply Of Labor And Materials For The Construction Of Warehouse Located At Brgy. Consuegra, Leyte, Leyte.” Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture-regional Field Office No. 8, Undertakes The Bidding Of This Procurement Project As “short-of-award.” Hence, The Notice Of Award To The Winning Bidder Shall Be Issued After Enactment By The Congress Of The General Appropriation Act (gaa) For 2025. 3. The Department Of Regional Field Office Viii Now Invites Bid For The Above Procurement Project. Completion Of Works Is Required Within One Hundred Twenty (120) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii: Instruction To Bidders Qty Uom Desription Total Cost Supply Of Labor And Materials For The Construction Of Warehouse Located At Brgy. Consuegra, Leyte, Leyte P6,435,616.19 96 Sq.ft Signboard/billboard 1 I.s. Mobilization/demobilization And Temporary Shelter 600 Sq.m. Clearing And Grubbing 91.24 Cu.m. Structure Excavation 376 Cu.m. Embankment 9255.19 Kgs. Reinforcing Steel 123.6 Cu.m. Reinforced Concrete 1 I.s. Formworks And Falseworks 644.56 Sq.m. Masonry Works 1185.34 Sq.m. Cement Plaster Finish 348.18 Sq.m. Metal Structures 348.18 Sq.m. Prepainted Metal Roofing 1 I.s. Plumbing 15.32 Sq.m. Ceramic Tiles 10.92 Sq.m. Carpentry And Joinery Works 3 Sets Steel Windows 61 Sets Aluminum Screen And Aluminum Glass Windows 4 Sets Doors 2 Sets Sliding Steel Door 1 I.s. Conduits, Boxes & Fittings 1 I.s. Wires & Wiring Devices 1 I.s. Power Load Center Switch Gear & Panel Board 15 Sets Lighting Fixtures 1 I.s. Solar Panel System 1185.34 Sq.m. Paintings 1 Lot Brass Marker Terms And Conditions: A During The Opening Of Bids, Bidders Shall: 1. Submit Certificate Of Project Site Inspection Issued By Farmer’s Association Or Barangay Officials Or Affidavit Of Site Inspection; 2. Submit Certificate Of Compliance To The Attached Drawings Duly Signed By The Bidder’s Authorized Representative And Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; B All Participating Bidder Must Comply With Section B Of Dpwh D.o. No. 197 Series Of 2016, Particularly In The Computation Ocm & Profit Of The Bid Amount. Use 12% For Vat Mark-up C During Post-qualification Evaluation 1. In Case Of Recomputed Bid, Bidder Shall Submit Its Revised Cost Estimates 2. Submit Pert/cpm And S-curve 3. Construction Methods 4. Manpower Schedule 5. Major Equipment Schedule 6. Provide Contractor's All Risk Insurance (cari) 7. Submit Plans, Design, And Specification Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; D Winning Bidder Shall: 1. Commence Construction Works Within Seven (7) Days Upon Receipt Of Notice To Proceed (ntp); 2. Complete The Construction Within 120 Calendar Days; 3. Provide Necessary Tools For The Satisfactory Completion Of The Project; 4. Assume Full Responsibility From The Time Project Construction Commences Up To The Final Acceptance By Darfo 8 And Shall Be Held Responsible For Any Damage In Part Or In Whole Except Those Occasioned By Force Majeure; 5. Assign A Project Engineer (either Licensed Agricultural Engineer Or Civil Engineer) That Will Oversee The Daily Construction Activities On Site; 6. Comply With The Quality Control Program (qcp) Schedule Of Minimum Testing Requirements Of The End-user; 7. Submit Material Test Report Or Its Equivalent Standard Certificate For Aggregate (sand & Gravel), And Cement 8. Submit Material Test Result From Accredited Testing Laboratory For Concrete, And Reinforcing Bar With Geotagged Photos, If Applicable; 9. Attend Pre-construction Meeting. 10. In Case Of Time Extension Due To Unworkable Weather Condition, Submit The Request With Pag-asa Weather Report And On-site Weather Chart Within The Succeeding Month. 11. Secure And Facilitate The Necessary Permits Required For The Project Implementation. 12. Strictly Observe Construction Safety Rules And Health Program Approved By Department Of Labor And Employment (dole) During Project Implementation. E Any Delay In The Project Completion Shall Be Subjected To Liquidated Damages Equivalent To At Least 1/10 Of 1% Of The Cost Of The Unperformed Portion Of The Works For Everyday Of Delay F Be Paid Through Partial Billing Based On Validated/verified Statement Of Work Accomplishment (swa) With Geo-tagged Photos On Major Works (before, During, And After) And Inspection Report By The Da-rfo8 Inspectorate Team. 1. At Least 30% Of The Physical Accomplishment; 2. At Least 70% Of The Physical Accomplishment; 3. At Least 75% Of The Physical Accomplishment; 4. 100% Of The Physical Accomplishment, Testing And Acceptance Of The Project G Advance Payment (maximum Of 15%) Will Be Granted Upon Submission Of The Following Requirements: 1. Advance Payment Bond By The Bidder 2. On-site Evaluation Report By The Da Project Engineer H Winning Bidder Shall Submit A Snapshot Of A Business Bank Account (preferably Landbank) To Effect Payment. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 5. Interested Bidders May Obtain Further Information From Department Of Agriculture – Regional Field Office 8 And Inspect The Bidding Documents At The Address Given Below During Office Hours, From 8:00 Am To 5:00 Pm 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 12, 2024 To January 08, 2025 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents Amounting To Ten Thousand Pesos Only (p10,000.00), Pursuant To The Latest Guidelines Issued By The Gppb. 7. The Department Of Agriculture-rfo 8 Will Hold A Pre-bid Conference On December 19, 2024 9:00 Am At Bac Office, Da-rfo8, Kanhuraw Hill, Tacloban City Through Face To Face Or Videoconferencing/webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 8. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before January 08, 2025, 9:00 Am (bac-secretariat Time). Late Bids Shall Not Be Accepted. 9. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 10. Bid Opening Shall Be On January 08, 2025, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity Either Physically Or Through Videoconferencing Via Google Meet. 11. The Department Of Agriculture-rfo 8 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Da Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 13. For Further Information, Please Refer To: Martins A. Alde Head, Bac-secretariat Department Of Agriculture, Regional Field Office-8 Kanhuraw Hill, Tacloban City Darfo8.bacsec@gmail.com Mobile No. 09061694318 Easternvisayas.da.gov.ph 14. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.philgeps.gov.ph Or Easternvisayas.da.gov.ph Approved By: (sgd.) Larry U. Sultan, Jd Chairman, Bids And Awards Committee
Closing Date8 Jan 2025
Tender AmountPHP 6.4 Million (USD 110.8 K)
Department Of Agriculture Tender
Civil And Construction...+1Civil Works Others
Philippines
Details: Description Section I. Invitation To Bid Da8-infra-2025-09 (pr No. Bt-25-infra-rice-39835-0010) 1. The Department Of Agriculture-regional Field Office No. 8, Through The Rice 2025-current Fund Intends To Apply The Sum Of Six Million Four Hundred Thirty-five Thousand Six Hundred Sixteen Pesos And 19/100 Only (p6,435,616.19) Being The Approved Budget For The Contract (abc) To Payment For The Contract For “supply Of Labor And Materials For The Construction Of Warehouse Located At Brgy. Gapas, Sta. Fe, Leyte”. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture-regional Field Office No. 8, Undertakes The Bidding Of This Procurement Project As “short-of-award.” Hence, The Notice Of Award To The Winning Bidder Shall Be Issued After Enactment By The Congress Of The General Appropriation Act (gaa) For 2025. 3. The Department Of Regional Field Office Viii Now Invites Bid For The Above Procurement Project. Completion Of Works Is Required Within One Hundred Twenty (120) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii: Instruction To Bidders Qty Uom Desription Total Cost Supply Of Labor And Materials For The Construction Of Warehouse Located At Brgy. Gapas, Sta. Fe, Leyte P6,435,616.19 96 Sq.ft Signboard/billboard 1 I.s. Mobilization/demobilization And Temporary Shelter 600 Sq.m. Clearing And Grubbing 91.24 Cu.m. Structure Excavation 376 Cu.m. Embankment 9255.19 Kgs. Reinforcing Steel 123.6 Cu.m. Reinforced Concrete 1 I.s. Formworks And Falseworks 644.56 Sq.m. Masonry Works 1185.34 Sq.m. Cement Plaster Finish 348.18 Sq.m. Metal Structures 348.18 Sq.m. Prepainted Metal Roofing 1 I.s. Plumbing 15.32 Sq.m. Ceramic Tiles 10.92 Sq.m. Carpentry And Joinery Works 3 Sets Steel Windows 61 Sets Aluminum Screen And Aluminum Glass Windows 4 Sets Doors 2 Sets Sliding Steel Door 1 I.s. Conduits, Boxes & Fittings 1 I.s. Wires & Wiring Devices 1 I.s. Power Load Center Switch Gear & Panel Board 15 Sets Lighting Fixtures 1 I.s. Solar Panel System 1185.34 Sq.m. Paintings 1 Lot Brass Marker Terms And Conditions: A During The Opening Of Bids, Bidders Shall: 1. Submit Certificate Of Project Site Inspection Issued By Farmer’s Association Or Barangay Officials Or Affidavit Of Site Inspection; 2. Submit Certificate Of Compliance To The Attached Drawings Duly Signed By The Bidder’s Authorized Representative And Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; B All Participating Bidder Must Comply With Section B Of Dpwh D.o. No. 197 Series Of 2016, Particularly In The Computation Ocm & Profit Of The Bid Amount. Use 12% For Vat Mark-up C During Post-qualification Evaluation 1. In Case Of Recomputed Bid, Bidder Shall Submit Its Revised Cost Estimates 2. Submit Pert/cpm And S-curve 3. Construction Methods 4. Manpower Schedule 5. Major Equipment Schedule 6. Provide Contractor's All Risk Insurance (cari) 7. Submit Plans, Design, And Specification Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; D Winning Bidder Shall: 1. Commence Construction Works Within Seven (7) Days Upon Receipt Of Notice To Proceed (ntp); 2. Complete The Construction Within 120 Calendar Days; 3. Provide Necessary Tools For The Satisfactory Completion Of The Project; 4. Assume Full Responsibility From The Time Project Construction Commences Up To The Final Acceptance By Darfo 8 And Shall Be Held Responsible For Any Damage In Part Or In Whole Except Those Occasioned By Force Majeure; 5. Assign A Project Engineer (either Licensed Agricultural Engineer Or Civil Engineer) That Will Oversee The Daily Construction Activities On Site; 6. Comply With The Quality Control Program (qcp) Schedule Of Minimum Testing Requirements Of The End-user; 7. Submit Material Test Report Or Its Equivalent Standard Certificate For Aggregate (sand & Gravel), And Cement 8. Submit Material Test Result From Accredited Testing Laboratory For Concrete, And Reinforcing Bar With Geotagged Photos, If Applicable; 9. Attend Pre-construction Meeting. 10. In Case Of Time Extension Due To Unworkable Weather Condition, Submit The Request With Pag-asa Weather Report And On-site Weather Chart Within The Succeeding Month. 11. Secure And Facilitate The Necessary Permits Required For The Project Implementation. 12. Strictly Observe Construction Safety Rules And Health Program Approved By Department Of Labor And Employment (dole) During Project Implementation. E Any Delay In The Project Completion Shall Be Subjected To Liquidated Damages Equivalent To At Least 1/10 Of 1% Of The Cost Of The Unperformed Portion Of The Works For Everyday Of Delay F Be Paid Through Partial Billing Based On Validated/verified Statement Of Work Accomplishment (swa) With Geo-tagged Photos On Major Works (before, During, And After) And Inspection Report By The Da-rfo8 Inspectorate Team. 1. At Least 30% Of The Physical Accomplishment; 2. At Least 70% Of The Physical Accomplishment; 3. At Least 75% Of The Physical Accomplishment; 4. 100% Of The Physical Accomplishment, Testing And Acceptance Of The Project G Advance Payment (maximum Of 15%) Will Be Granted Upon Submission Of The Following Requirements: 1. Advance Payment Bond By The Bidder 2. On-site Evaluation Report By The Da Project Engineer H Winning Bidder Shall Submit A Snapshot Of A Business Bank Account (preferably Landbank) To Effect Payment. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 5. Interested Bidders May Obtain Further Information From Department Of Agriculture – Regional Field Office 8 And Inspect The Bidding Documents At The Address Given Below During Office Hours, From 8:00 Am To 5:00 Pm 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 12, 2024 To January 08, 2025 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents Amounting To Ten Thousand Pesos Only (p10,000.00), Pursuant To The Latest Guidelines Issued By The Gppb. 7. The Department Of Agriculture-rfo 8 Will Hold A Pre-bid Conference On December 19, 2024 9:00 Am At Bac Office, Da-rfo8, Kanhuraw Hill, Tacloban City Through Face To Face Or Videoconferencing/webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 8. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before January 08, 2025, 9:00 Am (bac-secretariat Time). Late Bids Shall Not Be Accepted. 9. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 10. Bid Opening Shall Be On January 08, 2025, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity Either Physically Or Through Videoconferencing Via Google Meet. 11. The Department Of Agriculture-rfo 8 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Da Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 13. For Further Information, Please Refer To: Martins A. Alde Head, Bac-secretariat Department Of Agriculture, Regional Field Office-8 Kanhuraw Hill, Tacloban City Darfo8.bacsec@gmail.com Mobile No. 09061694318 Easternvisayas.da.gov.ph 14. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.philgeps.gov.ph Or Easternvisayas.da.gov.ph Approved By: (sgd.) Larry U. Sultan, Jd Chairman, Bids And Awards Committee
Closing Date8 Jan 2025
Tender AmountPHP 6.4 Million (USD 110.8 K)
City Of Danao Tender
Civil And Construction...+2Civil Works Others, Construction Material
Philippines
Details: Description Description Republic Of The Philippines Danao City Brgy.mantija Invitation To Apply For Eligibility And To Bid For The Bleacher Of Basketball Court/improvement Of Basketball Court Of Brgy. Mantija, Danao City The Brgy.mantija, Tends To Apply The Sum Of Php574,739.00 Being Approved Budget For The Contract (abc) To Payments Under The Contract For The Bleacher Of Basketball Court/improvement Of Basketball Court @ Brgy.mantija, Danao City. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Bid Opening. The Barangay Mantija Now Invites Sealed Bids From Eligible Bidder To Participate In The Public Bidding Of The Bleacher Of Basketball Court/ Improvement Of Basketball Court @ Brgy.mantija, Danao City As Follows; Seq. Qty. Item Description Estimated Unit Cost Estimated Cost 1. 439 Bags Portland Cement 248.00 108,872.00 2. 35 Bags Pozzoland Cement 220.00 7,700.00 3. 15 Cu.m Limestone 900.00 13,500.00 4. 24.5 Cu.m Washed Sand 2,100.00 51,450.00 5. 2 Cu.m Fined Sand 2,100.00 4,200.00 6. 24.5 Cu.m Crushed Gravel 2,100.00 51,450.00 7. 103 Length 10mm X 6m Deformed Bars 237.00 24,411.00 8. 210 Length 12mm X 6m Deformed Bars 318.00 66,780.00 9. 25 Kg. G.i Tie Wire #16 92.00 2,300.00 10. 9 Sht. ½’ordinary Plywood 784.00 7,056.00 11. 18 Pcs. 2”x2 2”x 10’ Coco Lumber 100.00 1,800.00 12. 10 Pcs. 2”x3”x2”x10 Coco Lumber 150.00 1,500.00 13. 1890 Pcs. 6” Chb 21.00 39,690.00 14. 6 Kg. Cwn 4” 81.00 486.00 15. 4 Kg. Cwn 2” 81.00 324.00 16. 3 Kg. Concrete Nail 1 ½ 115.00 345.00 17. 4 Pcs. Hacksaw Blade 69.00 276.00 18. 40 Pcs. 12mm X 300mm Anchor Bolt 115.00 4,600.00 19. 10 Pcs. 200mm X 150mm X 12mm Thk.base Plate1,695.00 16,950.00 20. 13 Lengths 38mm X 38mmx 6mm Thk X 6m Angle Bar1,675.00 21,775.00 21. 13 Lengths 50mm X 100mm X 1.5mm Thk C-purlins 1,090.00 14,170.00 22. 11 Lengths 12mm Thk X 305mm Hardi Senepea 520.00 5,720.00 23. 75 In.m Rib-type Painted Roofing Long Span0.6mm 585.00 43,875.00 24. 16 Sht. Pre-painted Gutter 0.6mm Thk 880.00 14,080.00 25. 432 Pcs. Tekscrew 2.1/2” 5.00 2,160.00 26. 1 Box Welding Rod (heavy Duty) 3,630.00 3,630.00 27. 10 Length 50mm G.i Pipe (sch.40) 1,890.00 18,900.00 28. 4 Length 38mm G.i Pipe (sch.40) 578.00 2,312.00 29. 22 Sht. 4.7mm X 25mm Flat Bar Stiffener 345.00 7,590.00 30. 14 Sht. Ga 10 Steel Matting 825.00 11,550.00 31. 16 Lengths 16mm X 6m Square Bars 872.00 13,952.00 32. 1 Length 12mm G.i Pipe (ordinary) 570.00 570.00 33. 1 Length 20mm G.i Pipe (ordinary) 720.00 720.00 34. 1 Length 10mm Plain Round Bar 237.00 237.00 35. 2 Length 16mm Plain Round Bar 529.00 1,058.00 36. 6 Pcs. 6mm Thk Steel Plate 225.00 1,350.00 37. 4 Gal Epoxy Primer With Catalyst (gray) 932.00 3,728.00 38. 1 Gal Lacquer Thinner 570.00 570.00 39. 2 Pcs. Paint Roller 7” With Tray 160.00 320.00 40. 5 Pcs. Paint Brush 4” 98.00 490.00 41. 4 Pcs. Paint Brush 2” 48.00 192.00 42. 2 Gal Epoxy Enamel (black) 1,050.00 2,100.00 Php 574,739.00 Delivery Of The Goods Is Required Not Later Than January 30, 2025. The Description Of An Eligible Bidders Is One Who Have Submitted The Following Requirements: Eligibilty Requirements To Be Submitted On January 07- 14, 2025 At 2:00 P.m. (note: All These Documents Should Be In A Separate Envelope.) 1. Dti Business Name Registration Or Sc Registration 2. Tax Clearance 3. Business Permit 4. Tax Identification Number 5. Authority Of The Signatory Duly Notarized If (single Proprietorship) / Secretary Certificate If Corp. 6. Omnibus Sworn Statement Duly Notarized 7. Valid Joint Venture Agreement 8. Articles Of Partnership Or Incorporation 9. On-going And Awarded Contracts 10. Completed Similar Contracts 11. Copies Of End-user’s Acceptance Letters For Completed Contracts 12. Specification Of Whether Or Not The Prospective Bidder Is A Manufacturer, Supplier, Or Distributor Duly Notarized 13. Audited Financial Statement. 14. Nfcc Duly Notarized Or Credit Line At Least 10% Of The Abc 15. Geps Registration Submission And Receipts Of Bids On January 14, 2025 At 1:30 O’clock In The Afternoon At The Bids And Awards Committee Office At Brgy. Mantija, Danao City. Technical Envelope: 1. Bid Security -2% Cash/ Cashier’s Check/manager’s Check/letter Of Credit/bank Draft/guarantee(based On Abc)5% Gsis Bond (based On The Abc)/bid Securing Declaration 2. Authority Of The Signatory Duly Notarized If (single Proprietorship) / Secretary Certificate If Corp. 3. Production / Delivery Schedule 4. Manpower Requirements 5. After-sales/parts,if Applicable. 6. Technical Specification Of The Products 7. Commitment To Extend A Credit Line / Nfcc At Least 10% Of The Abc Duly Notarized. 8. Omnibus Sworn Statement Duly Notarized Financial Envelope: 1. Bid Prices In The Bill Of Quantities In The Prescribed Bid Form. 2. The Recurring And The Maintenance Costs,if Applicable. Instructions To Bidders: 1.)for Winning Bidders,performance Security Shall Be Required To Guarantee The Faithful Performance Upon Signing The Contracts It Maybe 5% Of The Contract Prices On A Form Of Cash/manager’s Check Or 30% Gsis Bond. 2.)retention In The Amount Equivalent To At Least 10% Of Every Progress Payment Made Or Special Bank Guarantee Equivalent To At Least 10% Of The Total Contract Price.the Said Amount Shall Be Released Only After The Lapse Of The Warranty Period,3 ,months In Case Of Supplies And 1year In The Case Of Purchase Of Equipment. 3.)all Particulars Relative To Pre-qualifications,biddings,evaluation Of Bids And Awards Of Contracts Shall Be Governed By The Provision Of Ra 9184 And Other Rules Regulation As Maybe Applicable. 4.)the City Government Reserves The Right To Reject Any/or All Bids, To Waive Any Defect,informalities Therein And To Award To The Bidders Upon Evaluation By The Bids And Awards Committee (bac) The Bid That Are More Advantageous To The City. 5.)5% Value Added Tax (vat) Withheld Of The Contract Price.1% Creditable Income Tax Of Contract Price. 6.) Bidders Should Fill-up All Items ; Otherwise In Case Their Quotation Is Incomplete They Are Automatically Disqualified. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using As Specified In The Implementing Rules And Regulations Part! (irr-a) Of Republic Act No. 9184 (r.a. 9184),otherwise Known As The Government Procurement Reform Act,and Is Restricted To Organization With At Least Sixty Percent (60%)interest Or Outstanding Capital Stock Belongings To Citizen Of The Philippines,as Specified In Republic Act 5183 (r.a.5183).only Bids From Bidders Who Pass The Eligibility Check Will Be Opened.the Process For The Eligibility Check Is Described In Section Ll Of The Bidding Documents,itb.the Bidder With The Lowest Calculated Bid (lcb) Shall Advance To The Post-qualification Stage In Order To Finally Determine Who’s Responsiveness To The Technical And Financial Requirements Of The Project.the Contract Shall Then Be Awarded To The Lowest Calculated And Responsive Bidder (lcrb) Who Was Determined As Such During The Post-qualification Procedure. Very Truly Yours, Hon.ivan G. Pepito Brgy. Sk Chairman On Infrastructure Mantija,danao City
Closing Date14 Jan 2025
Tender AmountPHP 574.7 K (USD 9.8 K)
Department Of Agriculture Tender
Civil And Construction...+1Irrigation Work
Corrigendum : Closing Date Modified
Philippines
Details: Description Section I. Invitation To Bid Reference No.: Da8-infra-2025-05 (id No. Bt-25-infra-39835-0005) 1. The Department Of Agriculture-regional Field Office No. 8, Through The Rice-2025 Current Fund Intends To Apply The Sum Of Six Million Nine Hundred Twenty-five Thousand Eight Hundred Forty-one Pesos And 69/100 Only (p6,925,841.69) Being The Approved Budget For The Contract (abc) To Payment For The “supply Labor And Materials For The Construction Of Casidman Solar Powered Irrigation System (spis) Located At Brgy. Casidman, Arteche, Eastern Samar” Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture-regional Field Office No. 8, Undertakes The Bidding Of This Procurement Project As “short-of-award.” Hence, The Notice Of Award To The Winning Bidder Shall Be Issued After Enactment By The Congress Of The General Appropriation Act (gaa) For 2025. 3. The Department Of Regional Field Office Viii Now Invites Bid For The Above Procurement Project. Completion Of Works Is Required Within One Hundred Twenty-four (124) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii: Instruction To Bidders Qty Unit Desription Estimated Total Cost Supply Labor And Materials For The Construction Of Casidman Solar Powered Irrigation System (spis) Located At Brgy. Casidman, Arteche, Eastern Samar Scope Of Work: 6,925,841.69 67.24 Cu.m. Levelling Course 9 Cu.m. Grouted Riprap 30 L.m2 6" Diameter Hdpe Pipe 87 L.m2 1" Diameter Galvanized Iron Pipes 56 L.m2 1.5" Diameter Galvanized Iron Pipes 6 L.m2 3" Diameter Galvanized Iron Pipes 1 L.s Doors And Frame 1 L.s Fabricated Metal Roofing Accessories 1 L.s Prepainted Metal Sheets (corrugated) 28 Sq.m. Cement Plaster Finish 28 Sq.m. Painting Works 68 Sq.m. Masonry Works 1 L.s Structural Steel Roof Framing 1 L.s Valves And Pipe Fittings 14.63 Cu.m. Concrete Class "a" ( W/ Forms ) 7.64 Cu.m. Concrete Class "a" ( W/o Forms ) 65.2 Cu.m. Concrete Class "b" ( W/ Forms ) 60.2 Cu.m. Concrete Class "b" ( W/o Forms ) 7 Sq.m. Clearing And Grubbing 341.9 Cu.m. Structure Excavation 188.1 Cu.m. Embankment Fill (from Structure Excavation) 15538 Kgs. Reinforcing Bars 1 Lot Provision Of Permanent Marker 2 Each Project Billboard/signboard 1 L.s Occupational Health And Safety Program 1 Lot Mobilization & Demobilization 1 L.s Construction Of Camp And Other Temporary Facilities 1 L.s Aluminum Solar Frames 1 Assem Lightning Arrester (including Accessories And Wires) 86 L.m2 3" Cyclone Wire 86 L.m2 2 Strands Barbed Wire 1 Assem Trashrack 48 Pc Solar Modules (including Wiring) Specification: Peak Power : 550 Watts, Minimum Cell Type: Monocrystalline Efficiency: At Least 21% Mechanical Performance 5400 Pa Positive Load, Minimum 2400 Pa Negative Load, Minimum Should Pass The Following International Electrotechnical Commission (iec) Or Tuv Certification Equivalent Iec 61215 (mechanical Load, Climate, And Electrical Test) Iec 61701 (salt Mist Corrosion Test) Iec 61730 (pv Module Safety) Potential Induced Degradation (pid) Resistance Manufactured In Iso 9001 Certified Factories 1 Set Pump Set (solar Pump And Inverter/controller With Wiring) Specification: 1. Solar Pump Built In Motor Power: 22000 Watts, Minimum Tota Dynamic Head (tdh): 17 Meters, Minimum Type: Submersible Pump Discharge, Cu.m Per Day: 1300 Cu.m Per Day, Minimum With Return Valve Material: Stainless Steel Insulation Class: F Enclosure Class: Iec 34-5 Iso 5199 2. Inverter/controller Power: 30000 Watts, Minimum With Dry Run Protection Frequency: Variable Protected Against Reverse Polarity,overload, And Overtemperature Integrated Mppt (maximum Power Point Tracking) Ac/dc Compatible Enclosure Class: Ip65 Accessories: Level Switch/float Switch Discharge Meter Terms And Conditions: A During The Opening Of Bids, Bidders Shall: 1 Submit Certificate Of Project Site Inspection Issued By Farmer’s Association Or Barangay Officials Or Affidavit Of Site Inspection; 2 Submit Certificate Of Compliance To The Attached Drawings Duly Signed By The Bidder’s Authorized Representative And Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; B All Participating Bidder Must Comply With Section B Of Dpwh D.o. No. 197 Series Of 2016, Particularly In The Computation Ocm & Profit Of The Bid Amount. Use 12% For Vat Mark-up C During Post-qualification Evaluation 1 In Case Of Recomputed Bid, Bidder Shall Submit Its Revised Cost Estimates 2 Submit Pert/cpm And S-curve 3 Construction Methods 4 Manpower Schedule 5 Major Equipment Schedule 6 Provide Contractor's All Risk Insurance (cari) 7 Submit Plans, Design, And Specification Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; D Winning Bidder Shall: 1 Commence Construction Works Within Seven (7) Days Upon Receipt Of Notice To Proceed (ntp); 2 Complete The Construction Within 124 Calendar Days; 3 Provide Necessary Tools For The Satisfactory Completion Of The Project; 4 Assume Full Responsibility From The Time Project Construction Commences Up To The Final Acceptance By Darfo 8 And Shall Be Held Responsible For Any Damage In Part Or In Whole Except Those Occasioned By Force Majeure; 5 Assign A Project Engineer (either Licensed Agricultural Engineer Or Civil Engineer) That Will Oversee The Daily Construction Activities On Site; 6 Comply With The Quality Control Program (qcp) Schedule Of Minimum Testing Requirements Of The End-user; 7 Submit Material Test Report Or Its Equivalent Standard Certificate For Aggregate (sand & Gravel), And Cement 8 Submit Material Test Result From Accredited Testing Laboratory For Concrete, And Reinforcing Bar With Geotagged Photos 9 Attend Pre-construction Meeting. 10 In Case Of Time Extension Due To Unworkable Weather Condition, Submit The Request With Pag-asa Weather Report And On-site Weather Chart Within The Succeeding Month. 11 Secure And Facilitate The Necessary Permits Required For The Project Implementation. 12 Strictly Observe Construction Safety Rules And Health Program Approved By Department Of Labor And Employment (dole) During Project Implementation. E Any Delay In The Project Completion Shall Be Subjected To Liquidated Damages Equivalent To At Least 1/10 Of 1% Of The Cost Of The Unperformed Portion Of The Works For Everyday Of Delay F Be Paid Through Partial Billing Based On Validated/verified Statement Of Work Accomplishment (swa) With Geo-tagged Photos On Major Works (before, During, And After) And Inspection Report By The Da-rfo8 Inspectorate Team. 1 At Least 30% Of The Physical Accomplishment; 2 At Least 50% Of The Physical Accomplishment; 3 At Least 75% Of The Physical Accomplishment, And; 4 100% Of The Physical Accomplishment, Testing And Acceptance Of The Project G Advance Payment (maximum Of 15%) Will Be Granted Upon Submission Of The Following Requirements: 1 Advance Payment Bond By The Bidder 2 On-site Evaluation Report By The Da Project Engineer H Winning Bidder Shall Submit A Snapshot Of A Business Bank Account (preferably Landbank) To Effect Payment. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 5. Interested Bidders May Obtain Further Information From Department Of Agriculture – Regional Field Office 8 And Inspect The Bidding Documents At The Address Given Below During Office Hours, From 8:00 Am To 5:00 Pm 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 10, 2024 To January 02, 2025 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents Amounting To Ten Thousand Pesos Only (p10,000.00), Pursuant To The Latest Guidelines Issued By The Gppb. 7. The Department Of Agriculture-rfo 8 Will Hold A Pre-bid Conference On December 17, 2024, 9:00 Am At Bac Office, Da-rfo8, Kanhuraw Hill, Tacloban City Through Face To Face Or Videoconferencing/webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 8. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before January 02, 2025, 9:00 Am (bac-secretariat Time). Late Bids Shall Not Be Accepted. 9. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 10. Bid Opening Shall Be On January 02, 2025, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City Through Face To Face Or Videoconferencing/webcasting Via Google Meet. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 11. The Department Of Agriculture-rfo 8 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Da Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 13. For Further Information, Please Refer To: Martins A. Alde Head, Bac-secretariat Department Of Agriculture, Regional Field Office-8 Kanhuraw Hill, Tacloban City Darfo8.bacsec@gmail.com Landline No. (53)832-0834 Mobile No. 09061694318 Easternvisayas.da.gov.ph 14. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.philgeps.gov.ph Or Easternvisayas.da.gov.ph Approved By: (sgd.) Larry U. Sultan, Jd Chairman, Bids And Awards Committee
Closing Date9 Jan 2025
Tender AmountPHP 6.9 Million (USD 119.3 K)
Department Of Human Settlements And Urban Development - DHSUD Tender
Automobiles and Auto Parts
Philippines
Details: Description Request For Quotation Rfq-dhsudncr-24-005 General Repairs And Maintenance Services Of 3-unit Toyota Innova And 1-unit Toyota Hilux For The Fiscal Year 2025 Pursuant To Section 53.9 (small Value Procurement) Of The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184, The Department Of Human Settlements And Urban Development – National Capital Region (dhsud – Ncr) Would Like To Invite Your Company To Submit Quote Or Proposal For The Procurement Of General Repairs And Maintenance Services Of 3-unit Toyota Innova And 1-unit Toyota Hilux For The Fiscal Year 2025 The Approved Budget For The Contract (abc) Is One Hundred Seventy Thousand Pesos (p170,000.00), Inclusive Of All Existing And Appropriate Government Taxes And Charges. The Technical Specifications For The Said Procurement Items Are As Follows: Item No. Item Description Quantity 1 See Attached Terms Of Reference On Pg 3-5 4 Terms And Conditions: 1. Interested Bidders Must Submit An E-copy Of The Documentary Requirements Listed Below Along With The Proposal/quotation; 2. Price Quotation/s, To Be Denominated In Philippine Peso Shall Include All Taxes, Duties And/or Levies Payable; 3. The Item/s Shall Be Delivered According To The Requirements Specified In The Technical Specifications; 4. In Case Two Or More Bidders Are Determined To Have Submitted The Lowest Calculated And Responsive Bid, The Department Shall Adopt And Employ “draw Lots” As The Tie-breaking Method To Finally Determine The Single Winning Provider In Accordance With Gppb Circular 06-2005. 5. Quotations Exceeding The Approved Budget For The Contract Shall Be Rejected; 6. Award Of Contract Shall Be Made To The Lowest Quotation (for Goods And Infrastructure) Or, The Highest- Rated Offer (for Consulting Services) Which Complies With The Minimum Technical Specifications And Other Terms And Conditions Stated Herein. 7. Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By You Or Any Of Your Duly Authorized Representative/s. 8. The Department Shall Have The Right To Inspect The Item/s To Check Its Conformity With The Required Minimum Technical Specifications; 9. Payment Shall Be Made Upon Completion Of Services And Upon Submission Of The Supporting Documents For Processing Of Payment (e.g., Delivery Receipt, Sales Invoice, Billing Statement, Warranty Certificate If Applicable, And Other Documents As May Be Required In The Technical Specifications); Please Note That The Corresponding Bank Transfer Fee, If Any, Shall Be Chargeable To The Account Of The Supplier, Contractor, Or Consultant. 10. Issuance Of Official Receipts (or) Or Sales Invoice (si) In The Name Of The Department Of Human Settlements And Urban Development – Ncr (dhsud - Ncr) Is Mandatory. The Supplier Shall Bear The Cost Of Mailing The Ors Or Sis. The Supplier Shall Be Responsible For Bearing Any Bank Charges And/or Service Charges That May Be Incurred By The Department In Case Of Payment Requests Via Check Deposit; Supporting Documents: 1. Philgeps Registration Number / Certificate Of Philgeps Membership; 2. Mayor’s Permit/business Permit; (note: In Case The Permit Has Recently Expired, Please Submit The Old Permit And Attach The Official Receipt For The Renewal Application Thereof.) 3. Bir 2303 Certificate Of Registration. 4. Tax Clearance 5. Signed Omnibus Sworn Statement (oss) Note: Notarized Omnibus Sworn Statement (oss) Shall Be Submitted By The Lcrb Or Scrb Prior To The Processing Of Payment. If The Authorized Representative Listed On The Reply Slip Is Not The Same Person Who Executed The Omnibus Sworn Statement (oss) Kindly Attach A Copy Of The Notarized Special Power Of Attorney (spa) Together With The Valid Government-issued Identification Card Of Both Signatories. Supporting Documents To Be Attached In The Notarized Oss (as May Be Applicable): For Sole Proprietorships – Dti Business Name Registration; For Partnerships Or Corporations - A Notarized Special Power Of Attorney, Or A Notarized Secretary’s Certificate, Whichever Is Applicable 6. Latest Income/business Tax Return Instructions: 1. Accomplish This Rfq Correctly And Accurately. 2. Do Not Alter The Contents Of This Form In Any Way. 3. Technical Specifications Are Mandatory. Failure To Comply With Any Of The Mandatory Requirements Will Disqualify Your Quotation. 4. Failure To Follow These Instructions Will Disqualify Your Entire Quotation. Your Quotation Or Bid Proposal Must Be Submitted Together With The Attached Reply Slip And Documentary Requirements Listed On Page 2 Of This Rfq, On Or Before 10:00h 09 January 2025 Either Through Personal Delivery To Administrative And Finance Division – Procurement Unit Located At The 5th Floor, Dhsud Building, Kalayaan Avenue Corner Mayaman Street, Diliman, Quezon City Or Via Email Address Jay.cariaga@dhsud.gov.ph The Dhsud - Ncr Bids And Awards Committee (bac) Will Recommend The Award Of The Contract To The Dhsud - Ncr Head Of The Procuring Entity (hope) Of A Bidder With The Single/lowest Calculated Responsive Bid (scrb/lcrb) Pursuant To Section 37.1.1 Of The 2016 Revised Irr Of Ra 9184. The Dhsud - Ncr Reserves The Right To Reject Any And All Quotations/bids, To Annul The Procurement Process, Declare A Failure Of Bidding, To Reject All Quotations/bids At Any Time Prior To Contract Award, Or Not To Award The Contract, Without Thereby Incurring Any Liability To The Affected Bidder/s, And To Accept Only The Offer That Is Most Advantageous To The Government Pursuant To Sec. 41 Of The 2016 Revised Irr Of Ra 9184. For More Details, Please Email Us Or Contact Mr. Jay Michael R. Cariaga At Viber Number +639929369300. (original Signed) Maria Remelyn Sanchez Officer-in-charge, Administrative And Finance Division Terms Of Reference General Repairs And Maintenance Services Of 3-unit Toyota Innova And 1-unit Toyota Hilux For The Fiscal Year 2025 1. Background The Department Of Human Settlements And Urban Development – National Capital Region Act As The Primary National Government Entity Responsible For The Management Of Housing, Human Settlement And Urban Development Within The National Capital Region. In Order To Effectively Carry Out The Mandated Functions, Operational And Administrative Requirements Of Dhsud-ncr, The Use And Availability Of Official Dhsud-ncr Motor Vehicles Is Essential. As Such, To Ensure Accountable And Judicious Use, Proper Upkeep, Maintenance, And Timely Repair Of Said Vehicles, The Dhsud-ncr Intends To Engage A Service Provider For The Provision Of General Repair And Maintenance Services, Including The Supply And Installation Of Spare Parts, For The Dhsud-ncr Motor Vehicles. 2. Approved Budget For The Contract (abc) The Approved Budget For The Contract (abc) Is One Hundred Seventy Thousand Pesos Only (p170,000.00), Inclusive Of All Existing And Appropriate Government Taxes And Charges. Works Due To Unforeseen Damage And Defective Parts Shall Not Form Part Of The Abc. Costs For Labor, Parts And Materials Included Therein Shall Require A Separate Sales/service Invoice, Billing Statement Or Statement Of Account To Facilitate Payment To The Service Provider. 3. Scope Of Services Provide Job Estimate/checklist Report Prior To Commencement Of The Preventive Maintenance Service (pms) Or Repair Works Subject To The Approval Of An Authorized Representative Of Dhsud-ncr Through Its General Services Unit, Administrative And Finance Division. Perform The Necessary But Not Limited To The Following Services Prescribed Below: • Replace Strainer Fuel • Replace Fuel Filter • Replace Drain Plug Washer • Lubricate All Door Hinges And Windows • Top-up All Fluids • Replace Gasket Drain • Provide Gas Injector Cleaner • Provide Fuel Drier • Provide Oil Conditioner • Provide Nitrogen Tire Pressure • Replace Serpentine Belt • Replace/maintain Levels Of Other Oils And Filters As Needed • Check Engine System • Check Transmission System • Check Battery Condition And Replacement • Check All Components Of Brake System • Check All Tire Condition (including Spare Tire) And Replacement • Provide Vulcanization Service • Check All Components Of Suspension System • Adjust/replace/provide Parts And Components As Needed • Provide Necessary Tools And Materials To Complete The Works • Provide Other Vehicle Repair And Maintenance Service Vehicle Plate Number Toyota Innova 2.5 E Dsl 2013 Mt Sky 693 Toyota Innova 2.5 J Dsl 2013 Mt Skr 833 Toyota Innova 2.5 E Dsl 2005 Mt Shl 868 Toyota Hilux Snd9008/ln366a 4. Responsibilities Of The Service Provider (sp) • The Sp Must Have Service Centers Located Within 5.5km-radius From The Dhsud Building In Quezon City. • At Least One (1) Service Adviser Or One (1) Sales Adviser Must Be Available As The Need Arises To Attend To The Concerns Of Dhsud-ncr. • Availability Of The Service Centers From 8:00 Am To 5:00 Pm Daily. • Necessary Spare Parts, Materials, Tools, Manpower And Equipment To Carry Out The Necessary Pms Works. • Safekeeping Of Dhsud-ncr Motor Vehicles During Pms At The Service Center. • Maintain Strict Control Of All Accountable Documents. This Includes Logs And Registers Required By Dhsud-ncr. These Documents Will Be Made Available To Dhsud-ncr Upon Request. Each Vehicle Should Have A File And History Records. • The Sp Shall Supply And Install Genuine Service Parts And Materials Conforming To The Standards For The Specific Motor Vehicle And Always Ensure Availability Of Said Items. • The Sp Shall Only Use Fully Synthetic Engine Oil Or Recommended Standard Engine Oil As Prescribed By The Manufacturer. • The Sp Shall Return All The Waste Materials Being Removed/replaced From Dhsud-ncr Motor Vehicles. • The Sp Shall Ensure The Recommended Level Of All Fluids And Lubricants Replenishment Fluids / Lubricants To Include; Engine Oils, Transmission, Brake And Hydraulic Fluids, Gear Lubricants, And Coolants That Meet The Standards Set Forth By The Authorized Dealer For The Motor Vehicle. • Original Equipment Manufacturer (“oem”), Commercially Purchased Or Built Parts May Be Used If The Parts Match Or Exceed That Of Its Equivalent Genuine Spare Parts After Receiving Approval From An Authorized Representative Dhsud-ncr Through Its General Services Unit. • Provide Service Billing/billing Statement/statement Of Account Indicating Guaranty/warranty Cover And Official Receipt For Every Pms Accomplished By The Sp (inclusive Of Government Taxes). • In Case Of Services Not Covered By This Section, Separate Sales/service Invoice, Billing Statement And/or Statement Of Account And Official Receipt Shall Be Issued By The Sp. • Provide Recommendation And Post-inspection Report After Pms And Repair Done By The Sp In Preparation For The Next Schedule. 5. Responsibilities Of Department Of Human Settlements And Urban Development – Ncr (dhsud – Ncr) • The Amount Billed Shall Be Paid Within 15 Days To 30 Days From The Receipt Of The Statement Of Account Subject To Submission Of Required Supporting Documents. • Bir Form 2307 Pertaining To Taxes Withheld Shall Be Issued For Each Payment Made. • Mode Of Payment Shall Be Auto Debit Arrangement, If Available.
Closing Date9 Jan 2025
Tender AmountPHP 170 K (USD 2.9 K)
BARANGAY CAMIRE, TANAUAN, LEYTE Tender
Civil And Construction...+3Civil Works Others, Electrical and Electronics, Solar Installation and Products
Corrigendum : Closing Date Modified
Philippines
Details: Description I. Structure Excavation (common Soil) Ii. Structural Concrete For Footing And Slab On Fill Iii. Structural Concrete For Column Iv. Reinforcing Steel Of Reinforced Concrete Structures V. Fabrication & Installation Of Steel Post Vi. Lighting Fixtures (solar Panel) Vii. Formworks And Falseworks 1. Barangay Camire, Tanauan, Leyte Through The Bids And Awards Comm.) Invites Suppliers, Contractors, & Distributors Of Construction Materials For The Project: Installation Of Solar Street Light 2. The Bids And Awards Committee Will Use A Non-discretionary Pass/fail Criterion In The Eligibility Check/screening As Well As The Preliminary Examination Of Bids. 3. The Following Eligibility Documents In Two (2) Copies Duly Certified Must Be Submitted To The Bids And Awards Committee (bac) Not Later Than January 10, 2025: A.) Letter Of Intent; B.) Business License Permit/valid And Current Mayor’s Permit/municipal License; C.) Dti Business Name Registration Or Sec Registration Certificate; D.) Latest Audited Financial Statement; E.) Company Profile; F.) Tax Identification No. (tin); G.) Sworn Statement By The Prospective Bidder That He Is Not “barred” Or “blacklisted” From Participating In The Government Biddings, Including Non-inclusion In The Consolidated Blacklisting Report Issued By Gppb; H.) Other Appropriate License As Maybe Required By The Procuring Entity; I.) Statement Of Prospective Bidder Of All Its Ongoing And Completed Government And Private Contracts Within The Period Specified In The Iaeb, Including Contracts Awarded But Not Yet Started; J.) Articles Of Incorporation, Partnership Or Cooperation, Whichever Is Applicable, Including Amendments Thereto, If Any; K.) Sworn Affidavit Of The Bidder That Is Not Related To The Head Of The Procuring Entity, Members Of The Bac, Twg And Secretariat And The Members Of The Pmo And The Designers Of The Project, By Consanguinity Or Affinity Up To The Third Civil Degree; L.) Valid Joint Venture Agreement In Case Of Joint Venture; M.) Letter Authorizing The Bac Or Its Duly Authorized Representative/s To Verify Any Or All Of The Documents Submitted For Eligibility Check; Certification Under Oath That Each Of The Documents Submitted In Satisfaction Of Eligibility Requirements Is An Authentic And Original Copy, Or A True And Faithful Reproduction Of The Original Complete And That All Statements And Information Provided Therein Are True And Correct; N.) Other Appropriate Licenses As May Be Required By The Procuring Entity Concerned; O.) Copies Of End-user’s Acceptance Letter For Completed Contracts; P.) Specification Of Whether Or Not Prospective Bidder Is A Manufacturer Supplier Or Distributor; Q.) Audited Financial Statement “received” By The Ir Or Its Duly Accredited And Authorized Institutions, For Immediately Preceding Calendar Year, Showing Among Others The Total Assets And Liabilities; R.) Computation Of Net Financial Contracting Capacity (nfcc) Or S.) Certificate Of Commitment Specific To The Contract At Hand, Issued By A Licensed Bank To Extend To The Bidder A Credit Line If Awarded The Contract Or; T.) A Cash Deposit Certified Certifying A Hold Out On Cash Deposits Issued By A Licensed Bank Which Shall Also Be Specific To The Contract To Be Bid, In An Amount Not Lower That The Set By The Procuring Entity In The Bidding Documents, Which Shall Be At Least Equal To 10% Of The Approved Budget For Contract. 4. Sealed Two (2) Envelope System Will Be Received By The Bac At The Barangay Hall Not Later Than 2:00 Pm On January 10, 2025. 5. Barangay Camire, Tanauan, Leyte Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Incurred In The Preparation Of Their Bids. 6. Barangay Camire, Tanauan, Leyte Reserves The Right To Reject Or All Bids To Waive Any Defect And Informally Therein. Hon. Rossarie Anne Flores Barangay Chairman Instructions To Bidders 1.1 Only Firms/entities Duly Qualified Eligibility Requirements By The Bids And Awards Committee(bac) To Participate In The Bidding May Submit Proposals. 1.2 Bids /tenders Shall Be Considered Only From Bidders Who Have Visited The Site And Who Have Secured Bid Documents With The Equipment Specification At The Bac Secretary, 1.3 All Bids/tenders Shall Be Prepared In English And Submitted To Bac Secretary; 1.4 The Bidder Shall Prepare His Bid By Accomplishing And Submitting Three (3) Copies Of The Bid/tender Documents(e.i. Prescribed Forms)including The Required Enclosed Attachments. All Blank Space Must Be Properly Filled Out By The Typewriter Except Where Specifically Otherwise Stated. 1.5 If Erasures Or Changes Are Made ,each Erasures Or Changes Must Initiated By The Person Signing The Bid/tender. 1.6 Bid/tenders Will Be Submitted For Any Items. Bids/tenders Must Be For All Items In The Bill Of Quantities Of Any Items. Bid/tenders Shall Be Written In Words As Well As In Figures, The Price In Words Shall Prevail. In Case Of Discrepancy In The Unit Price And The Extension Thereof, The Unit Price Shall Govern. 1.7 All Pages In Bid Tender Documents, Including Annexes Shall Be Signed In Ink. The Bid/tender Must Signed By The Bidder Himself Or Duly Authorized Person Or Persons. 1.8 The Bid/tender Shall Contain All The Information And Data Required To Be Furnished By The Bidder/tender. 1.9 The Bidder Required To Make A Careful Examination And Contemplated In The Bid Documents, Specifications, Special Provisions If Any, And The Form Of Contract, And Fully Informs Himself As To Quality Of Materials. The Submission Of Bids By Any Bidder Shall Be Deemed That He Has Made Such Examination And Is Satisfied As To The Condition To Be Encountered In Performing The Work Contemplated And Has Familiarized Him With All The Requirements Governing Or Affecting Him And His Operations. 1.10 The Barangay Assumes No Obligations Whatsoever To Compensate Or Indemnify The Bidders /tenders For Any Expense Or Loss That May Occur In The Preparation Of Their Proposals, Nor Does The Barangay Guarantee That An Award Will Be Made Under The Contract Documents. Bid Security 1.11 All Bids Shall Be Accomplished By The Bid Security Least Equal To, And Not Lower Than One Percent(1%)as Approved Budget For The Contract To Be Bid In The Form Of Cash, Certified Check, Cashier’s Check ,managers Check, Bank Draft Or Irrevocable Letter Of Credit ,one And One Half Percent(1 ½%) In The Form Of Bank Guarantee, Two And One Half Percent (2 ½%)in The Form Of Surety Bond Callable Upon Demand Issued By A Reputable Surety Or Insurance Company Payable To Barangay Camire, Tanauan, Leyte As A Guarantee That The Successful Bidder Within Ten Calendar Days(10) Or Less From Receipt Of Notice Of Award ,enter Into Contract With The Barangay And F6rnish The Performance Bond. Bid Securities Shall Be Valid For A Reasonable Period As Indicated Which Shall Not Be Less Than One Hundred Twenty (120) Calendar Days Following The Opening Of Bids. 1.12 No Bid Securities Shall Be Returned To Bidders After The Opening Of Bids And Before Contract Signing, Except Of Those That Failed To Comply With Any Of The Requirement Tone Be Submitted In The First Bid Envelop Of The Bid. 1.13 Failure To Enclose The Required Bid Security In The Form And Amount Prescribed Herein Shall Automatically Disqualify The Bid Concerned. Submission And Receipt Of Bids 1.14 Bid/proposals In The Prescribed Form, Shall Be Submitted In Two (2) Sealed Envelope Properly Marked In Capital Letters The Name/title Of The Project To Be Bid And The Name Of The Bidders, And Must Be Addressed To; The Bac Chairman, Bids And Awards Committee(bac) And Or, Type Bac Chairman, Barangay Camire, Tanauan, Leyte. The Bidders Shall Mark The Two Envelopes; Do Not Open (date And Time Of Opening Of Bids). 1.15 The First Envelope Which Should Be Marked “1st” Shall Contain The Following; 1.bid Security As To Form Amount And Validity Period ;2.authority Of The Signatory ;3.production /delivery Schedule; 4.manpower Requirements;5.after Sales Service/parts; If Applicable;6.technical Specifications;7. Commitment From The Suppliers/distributors/manufacturer’s Bank To Extend To Him A Credit Line If Awarded The Contract To Be Bid Or Cash Deposit Equivalent To Ten Percent (10%) Of The Abc (p454,942.80);8.duly Signed Certificate In Compliance With The Disclosure Provision Under Section 47 Of The Act In Relation To Other Provisions Of Ra3019 ;duly Signed Statement Attesting To Have Complied With Responsibilities Listed In Gpra Irr-a And Other Documents /materials As Stated In The Instruction To Bidders. 1.16 The Second Envelope, Which Should Be Marked “2nd” Shall Contain The Following; 1.the Bid Prices In The Bill Of Quantities In The Prescribed Bid Form; 2.the Recurring And The Maintenance Costs, If Applicable. Withdrawal Of Bids 1.17 A Bidder May Modify Its Bid Before Deadline For The Submission And Receipt Of Bids Not Allowed To Retrieve Its Original Bid, But Shall Send Another Bid Equally Sealed, Properly Identified And Marked As A Modification And Stamped Received By Bac. 1.18 A Bidder Will Be Allowed To Withdraw His Bid Prior To The Time Set For Its Opening Provided He Communicated His Purpose In Writing To The Bac; In This Case The Bid/tender Shall Return To Him Un Opened .no Bid Can Be Withdrawn For Any Reason Whatsoever After Opening Of Bids Has Commenced. 1.19 The Bidder Shall Be Responsible For Having Taken Steps To Carefully Examine All The Contract Documents ,have Fully Informed Himself With All Conditions, Local Or Otherwise ,relative To The Carrying Out Of The Contract Work; 1.20 The Barangay Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Or Conclusions Obtained By The Bidder Out Of The Data Furnished By The Barangay Or Its Consultant, Either Before Or Conditions Contained In The Contract. Laws, Ordinances , Rules And Regulations 1.21 In Submitting A Proposal/bid ,the Bidder Is Considered To Have Familiarized Himself, Acts, Rules And Regulations Of The Republic Of The Philippines, Including Any Or All Local Ordinances Or Rules Or Regulations, Which In Any Manner May Affect Or Apply To The Operation And Activities Of The Bidders. The Bidder Shall Be The Employer Of The Personnel Whom He Will Engage The Prosecution Of The Contract And Is Under Obligation To Comply With The Labor Laws Of The Philippines. 1.22 In Addition , The Bidder Is Advised To Carefully Examine And To Inform And To Familiarized Himself With All The Ordinances ,rules, And Regulations Adopted By The Barangay In Regards With The Procurement Of Goods. Bidders Competence 1.23 The Barangay Reserves The Right To Fully Examine The Competence And Responsibility Of The Bidder At Any Time Before Award Of Contract By Aby Means And To Reject Any Bid/tender When Statement As To Business And Technical Organizations Or Financial Resources Or Construction Performance Have Been Found To Be False /and Or Fabricated And In The Barangay’s Opinion Would Justify Rejection. Pre Bid Conference 1.24 No Pre Bid Conference Will Be Conducted Except Upon Written Request Of Any Prospective Bidder Which Shall Be Held Within A Reasonable Period Before Prospective To Adequately Prepare The Bids Subject To The Approval Of The Bac. 1.25 Bids Will Be Opened On January 10, 2025 At Exactly 2:00 Pm At The Barangay Hall. Bidders Or Authorized Representative May Attend The Opening Of Bids. 1.26 Immediately After Opening Of Bids The Bac Of The Barangay Will Undertake A Thorough Study And Bid Evaluation Of Proposed Submitted. Award Of The Contract Shall Be Made To The Bidder With The Lowest Calculated Responsive Bid. 1.27 The Barangay Reserves The Right To Reject Any Or All Bids /tenders ,to Waive Informality In The Bid/tender Received .the Right Is Also Reserve To Reject The Bid/tender Of Any Bidder Who (a)have Previously Failed To Satisfactorily Perform Or Complete Any Construction Contract Undertaken By Him. (b)was Qualified In The Eligibility Requirement On The Basis Of Suppressed Or False Information; Or (c) Such Other Compelling Grounds As Determined During Bid Evaluation Of The Proposal Of Bids; 1.28 Within A Period Not Exceeding Fifteen (15) Calendar Days From The Declaration By The Bac Of The Lowest Calculated Responsive Bid Or Highest Rated Responsive Bid And Immediately After Approval Of The Recommendation Of The Bac By The Local Chief Executive Of His Duly Authorized Representative Shall Issue The Notice Of Award To The Winning Bidder. Created By: Hon. Rossarie Anne Flores Barangay Chairman
Closing Date10 Jan 2025
Tender AmountPHP 454.9 K (USD 7.8 K)
BARANGAY GUINGAWAN, TANAUAN LEYTE Tender
Civil And Construction...+1Construction Material
Philippines
Details: Description I. Metal Works (2 Pcs Containers) 1. Barangay Guingauan, Tanauan, Leyte Through The Bids And Awards Comm.) Invites Suppliers, Contractors, & Distributors Of Construction Materials For The Project: Fabrication/installation Of Material Recovery Facility 2. The Bids And Awards Committee Will Use A Non-discretionary Pass/fail Criterion In The Eligibility Check/screening As Well As The Preliminary Examination Of Bids. 3. The Following Eligibility Documents In Two (2) Copies Duly Certified Must Be Submitted To The Bids And Awards Committee (bac) Not Later Than January 14, 2025: A.) Letter Of Intent; B.) Business License Permit/valid And Current Mayor’s Permit/municipal License; C.) Dti Business Name Registration Or Sec Registration Certificate; D.) Latest Audited Financial Statement; E.) Company Profile; F.) Tax Identification No. (tin); G.) Sworn Statement By The Prospective Bidder That He Is Not “barred” Or “blacklisted” From Participating In The Government Biddings, Including Non-inclusion In The Consolidated Blacklisting Report Issued By Gppb; H.) Other Appropriate License As Maybe Required By The Procuring Entity; I.) Statement Of Prospective Bidder Of All Its Ongoing And Completed Government And Private Contracts Within The Period Specified In The Iaeb, Including Contracts Awarded But Not Yet Started; J.) Articles Of Incorporation, Partnership Or Cooperation, Whichever Is Applicable, Including Amendments Thereto, If Any; K.) Sworn Affidavit Of The Bidder That Is Not Related To The Head Of The Procuring Entity, Members Of The Bac, Twg And Secretariat And The Members Of The Pmo And The Designers Of The Project, By Consanguinity Or Affinity Up To The Third Civil Degree; L.) Valid Joint Venture Agreement In Case Of Joint Venture; M.) Letter Authorizing The Bac Or Its Duly Authorized Representative/s To Verify Any Or All Of The Documents Submitted For Eligibility Check; Certification Under Oath That Each Of The Documents Submitted In Satisfaction Of Eligibility Requirements Is An Authentic And Original Copy, Or A True And Faithful Reproduction Of The Original Complete And That All Statements And Information Provided Therein Are True And Correct; N.) Other Appropriate Licenses As May Be Required By The Procuring Entity Concerned; O.) Copies Of End-user’s Acceptance Letter For Completed Contracts; P.) Specification Of Whether Or Not Prospective Bidder Is A Manufacturer Supplier Or Distributor; Q.) Audited Financial Statement “received” By The Ir Or Its Duly Accredited And Authorized Institutions, For Immediately Preceding Calendar Year, Showing Among Others The Total Assets And Liabilities; R.) Computation Of Net Financial Contracting Capacity (nfcc) Or S.) Certificate Of Commitment Specific To The Contract At Hand, Issued By A Licensed Bank To Extend To The Bidder A Credit Line If Awarded The Contract Or; T.) A Cash Deposit Certified Certifying A Hold Out On Cash Deposits Issued By A Licensed Bank Which Shall Also Be Specific To The Contract To Be Bid, In An Amount Not Lower That The Set By The Procuring Entity In The Bidding Documents, Which Shall Be At Least Equal To 10% Of The Approved Budget For Contract. 4. Sealed Two (2) Envelope System Will Be Received By The Bac At The Barangay Hall Not Later Than 2:00 Pm On January 14, 2025. 5. Barangay Guingauan, Tanauan, Leyte Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Incurred In The Preparation Of Their Bids. 6. Barangay Guingauan, Tanauan, Leyte Reserves The Right To Reject Or All Bids To Waive Any Defect And Informally Therein. Hon. Leonil Badana Barangay Chairman Instructions To Bidders 1.1 Only Firms/entities Duly Qualified Eligibility Requirements By The Bids And Awards Committee(bac) To Participate In The Bidding May Submit Proposals. 1.2 Bids /tenders Shall Be Considered Only From Bidders Who Have Visited The Site And Who Have Secured Bid Documents With The Equipment Specification At The Bac Secretary, 1.3 All Bids/tenders Shall Be Prepared In English And Submitted To Bac Secretary; 1.4 The Bidder Shall Prepare His Bid By Accomplishing And Submitting Three (3) Copies Of The Bid/tender Documents(e.i. Prescribed Forms)including The Required Enclosed Attachments. All Blank Space Must Be Properly Filled Out By The Typewriter Except Where Specifically Otherwise Stated. 1.5 If Erasures Or Changes Are Made ,each Erasures Or Changes Must Initiated By The Person Signing The Bid/tender. 1.6 Bid/tenders Will Be Submitted For Any Items. Bids/tenders Must Be For All Items In The Bill Of Quantities Of Any Items. Bid/tenders Shall Be Written In Words As Well As In Figures, The Price In Words Shall Prevail. In Case Of Discrepancy In The Unit Price And The Extension Thereof, The Unit Price Shall Govern. 1.7 All Pages In Bid Tender Documents, Including Annexes Shall Be Signed In Ink. The Bid/tender Must Signed By The Bidder Himself Or Duly Authorized Person Or Persons. 1.8 The Bid/tender Shall Contain All The Information And Data Required To Be Furnished By The Bidder/tender. 1.9 The Bidder Required To Make A Careful Examination And Contemplated In The Bid Documents, Specifications, Special Provisions If Any, And The Form Of Contract, And Fully Informs Himself As To Quality Of Materials. The Submission Of Bids By Any Bidder Shall Be Deemed That He Has Made Such Examination And Is Satisfied As To The Condition To Be Encountered In Performing The Work Contemplated And Has Familiarized Him With All The Requirements Governing Or Affecting Him And His Operations. 1.10 The Barangay Assumes No Obligations Whatsoever To Compensate Or Indemnify The Bidders /tenders For Any Expense Or Loss That May Occur In The Preparation Of Their Proposals, Nor Does The Barangay Guarantee That An Award Will Be Made Under The Contract Documents. Bid Security 1.11 All Bids Shall Be Accomplished By The Bid Security Least Equal To, And Not Lower Than One Percent(1%)as Approved Budget For The Contract To Be Bid In The Form Of Cash, Certified Check, Cashier’s Check ,managers Check, Bank Draft Or Irrevocable Letter Of Credit ,one And One Half Percent(1 ½%) In The Form Of Bank Guarantee, Two And One Half Percent (2 ½%)in The Form Of Surety Bond Callable Upon Demand Issued By A Reputable Surety Or Insurance Company Payable To Barangay Guingauan, Tanauan, Leyte As A Guarantee That The Successful Bidder Within Ten Calendar Days(10) Or Less From Receipt Of Notice Of Award ,enter Into Contract With The Barangay And F6rnish The Performance Bond. Bid Securities Shall Be Valid For A Reasonable Period As Indicated Which Shall Not Be Less Than One Hundred Twenty (120) Calendar Days Following The Opening Of Bids. 1.12 No Bid Securities Shall Be Returned To Bidders After The Opening Of Bids And Before Contract Signing, Except Of Those That Failed To Comply With Any Of The Requirement Tone Be Submitted In The First Bid Envelop Of The Bid. 1.13 Failure To Enclose The Required Bid Security In The Form And Amount Prescribed Herein Shall Automatically Disqualify The Bid Concerned. Submission And Receipt Of Bids 1.14 Bid/proposals In The Prescribed Form, Shall Be Submitted In Two (2) Sealed Envelope Properly Marked In Capital Letters The Name/title Of The Project To Be Bid And The Name Of The Bidders, And Must Be Addressed To; The Bac Chairman, Bids And Awards Committee(bac) And Or, Type Bac Chairman, Barangay Guingauan, Tanauan, Leyte. The Bidders Shall Mark The Two Envelopes; Do Not Open (date And Time Of Opening Of Bids). 1.15 The First Envelope Which Should Be Marked “1st” Shall Contain The Following; 1.bid Security As To Form Amount And Validity Period ;2.authority Of The Signatory ;3.production /delivery Schedule; 4.manpower Requirements;5.after Sales Service/parts; If Applicable;6.technical Specifications;7. Commitment From The Suppliers/distributors/manufacturer’s Bank To Extend To Him A Credit Line If Awarded The Contract To Be Bid Or Cash Deposit Equivalent To Ten Percent (10%) Of The Abc (p84,000.00);8.duly Signed Certificate In Compliance With The Disclosure Provision Under Section 47 Of The Act In Relation To Other Provisions Of Ra3019 ;duly Signed Statement Attesting To Have Complied With Responsibilities Listed In Gpra Irr-a And Other Documents /materials As Stated In The Instruction To Bidders. 1.16 The Second Envelope, Which Should Be Marked “2nd” Shall Contain The Following; 1.the Bid Prices In The Bill Of Quantities In The Prescribed Bid Form; 2.the Recurring And The Maintenance Costs, If Applicable. Withdrawal Of Bids 1.17 A Bidder May Modify Its Bid Before Deadline For The Submission And Receipt Of Bids Not Allowed To Retrieve Its Original Bid, But Shall Send Another Bid Equally Sealed, Properly Identified And Marked As A Modification And Stamped Received By Bac. 1.18 A Bidder Will Be Allowed To Withdraw His Bid Prior To The Time Set For Its Opening Provided He Communicated His Purpose In Writing To The Bac; In This Case The Bid/tender Shall Return To Him Un Opened .no Bid Can Be Withdrawn For Any Reason Whatsoever After Opening Of Bids Has Commenced. 1.19 The Bidder Shall Be Responsible For Having Taken Steps To Carefully Examine All The Contract Documents ,have Fully Informed Himself With All Conditions, Local Or Otherwise ,relative To The Carrying Out Of The Contract Work; 1.20 The Barangay Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Or Conclusions Obtained By The Bidder Out Of The Data Furnished By The Barangay Or Its Consultant, Either Before Or Conditions Contained In The Contract. Laws, Ordinances , Rules And Regulations 1.21 In Submitting A Proposal/bid ,the Bidder Is Considered To Have Familiarized Himself, Acts, Rules And Regulations Of The Republic Of The Philippines, Including Any Or All Local Ordinances Or Rules Or Regulations, Which In Any Manner May Affect Or Apply To The Operation And Activities Of The Bidders. The Bidder Shall Be The Employer Of The Personnel Whom He Will Engage The Prosecution Of The Contract And Is Under Obligation To Comply With The Labor Laws Of The Philippines. 1.22 In Addition , The Bidder Is Advised To Carefully Examine And To Inform And To Familiarized Himself With All The Ordinances ,rules, And Regulations Adopted By The Barangay In Regards With The Procurement Of Goods. Bidders Competence 1.23 The Barangay Reserves The Right To Fully Examine The Competence And Responsibility Of The Bidder At Any Time Before Award Of Contract By Aby Means And To Reject Any Bid/tender When Statement As To Business And Technical Organizations Or Financial Resources Or Construction Performance Have Been Found To Be False /and Or Fabricated And In The Barangay’s Opinion Would Justify Rejection. Pre Bid Conference 1.24 No Pre Bid Conference Will Be Conducted Except Upon Written Request Of Any Prospective Bidder Which Shall Be Held Within A Reasonable Period Before Prospective To Adequately Prepare The Bids Subject To The Approval Of The Bac. 1.25 Bids Will Be Opened On January 14, 2025 At Exactly 2:00 Pm At The Barangay Hall. Bidders Or Authorized Representative May Attend The Opening Of Bids. 1.26 Immediately After Opening Of Bids The Bac Of The Barangay Will Undertake A Thorough Study And Bid Evaluation Of Proposed Submitted. Award Of The Contract Shall Be Made To The Bidder With The Lowest Calculated Responsive Bid. 1.27 The Barangay Reserves The Right To Reject Any Or All Bids /tenders ,to Waive Informality In The Bid/tender Received .the Right Is Also Reserve To Reject The Bid/tender Of Any Bidder Who (a)have Previously Failed To Satisfactorily Perform Or Complete Any Construction Contract Undertaken By Him. (b)was Qualified In The Eligibility Requirement On The Basis Of Suppressed Or False Information; Or (c) Such Other Compelling Grounds As Determined During Bid Evaluation Of The Proposal Of Bids; 1.28 Within A Period Not Exceeding Fifteen (15) Calendar Days From The Declaration By The Bac Of The Lowest Calculated Responsive Bid Or Highest Rated Responsive Bid And Immediately After Approval Of The Recommendation Of The Bac By The Local Chief Executive Of His Duly Authorized Representative Shall Issue The Notice Of Award To The Winning Bidder. Created By: Hon. Leonil Badana Barangay Chairman
Closing Date14 Jan 2025
Tender AmountPHP 84 K (USD 1.4 K)
DEPT OF THE NAVY USA Tender
Others
United States
Description: Contact Information|4|n792.10|t2q|215-697-9948|kimberly.flores12.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|x||||||||
inspection And Acceptance Of Supplies|26|x||||||||||||x||||||||||||||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving (combo) Type||tbd|n00383|tbd|tbd|see Schedule|tbd|||||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|12 Months|60 Days After Discovery Of Defect.|||||
warranty Of Data - Basic (mar 2014)|2|||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
first Article Approval--government Testing (sep 1989)|7||||||||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
limitation Of Liability--high-value Items (feb 1997)|1||
limitations On Pass-through Charges (jun 2020)|1||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
annual Representations And Certifications (may 2024)|12|336413|1250|||||||||||
facsimile Proposals (oct 1997)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x|
evaluation Of First Article Testing|3||||
this Solicitation Is For Made New Manufacture Spare Parts.
the Government Intends To Make A Single Award To The Eligible, Responsible,technically Acceptable Offeror Whose Offer, Conforming To The Solicitation, Isdetermined Most Advantageous To The Government, Price, Capacity, And Deliveryconsidered.
navsup Wss Requests Proposals Submitted In Response To This Solicitation Remain Valid For A Minimum Of 120 Days Following Submission.
all Contractual Documents Related To The Instant Procurement Are Considered Tobe "issued" By The Government When Copies Are Either Deposited In The Mail,transmitted By Facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Governments
acceptance Of The Contractors Proposal Constitutes
bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
\
1. Scope
1.1 . Markings Shall Be In Accordance With Mil-std-130.
1.2 Pre-award / Post Award Requirements:
due To The Critical Use Of This Item And Its Quality History, A Pre-award Survey And Post-award Conference May Be Required For All New Manufacturers. For All Previous Sources, A Post-award Conference May Be Recommended.
1.3 The Components Being Acquired Under This Solicitation Have Been Classified As Flight Critical Requiring Engineering Source Approval By The Naval Air Systems Command. Only Those Companies Who Have Submitted Requests For Source Approval And Been Approved
will Be Eligible For Award Under This Solicitation. Any Company Not Previously Approved May Submit A Source Approval Request To The Contracting Officer, Naval Inventory Control Point, (see Block 10 Of The
sf33 For Name And Code). The Source Approval Request Shall Contain The Following Documentation And Shall Be Submitted By The Closing Date Of This Solicitation:
(a) Copy Of Complete Configuration Drawings For A Similar Item(s) Which Your Company Has Produced Within The Past Three Years, Including Test Procedures For Which Your Company (1) Has Been Qualified To Manufacture And (2) Which Is Similar, I.e., Requires The
same Materials, Manufacturing Processes, Inspections, Tolerances And Similar Application As The Item(s) For Which You Are Seeking Approval.
(b) Copy Of The Complete Process/operation Sheets Used To Manufacuture The Similar Item, Including But Not Limited To, Detailed Shop Sketches. These Plans Must Note Those Operations And Processes Performed By Subcontractors/ Vendors.
(c) Complete Copies Of Purchase Orders, Shipping Documents, Etc. That Document Delivery Of Production Quantities Of The Part To The Original Equipment Manufacturer Or Military Service. Provide The Most Recent Copies Of The Documents.
(d) A Detailed Comparative Analysis Of The Differences/similarities Between The Similar Part And The Part(s) For Which You Are Seeking Approval. This Analysis Should Include Materials, Configuration, Tolerances, Process Requirements, Dimensions, Castings,
forgings, Etc.
(e) Copy Of Inspection Method Sheets Used In The Manufacturing And At Final Inspection. These Sheets Should Include Actual Tolerance, Print Requirements, Inspection Devices, Sources Performing The Operation And Level Of Inspection. Critical Characteristics
should Be Discernible From All Other Characteristics.
the Above Requirements Are A Subset Of Requirements Specified In The Aso
source Approval Information Brochure Dated January 1995. The Submission Of This Data Subset Is Contingent Upon And In Consideration Of The Submitting Contractor Meeting All Other Requirements Specified In This Solicitation To Include A Bilateral Agreement With
mda Which Includes Availability Of Complete Data, Mrb Disposition, Etc. Any Company Not Having Such Agreement, But Desiring To Seek Engineering Source Approval, Will Be Required To Submit Data Meeting All Requirements Of The Aso/navicp Source Approval
brochure.
1.4 Sampling Rates (aqls) Indicated Below Shall Be Used In Accordance With
ansi Z1.4 For Single Sampling And A General Inspection Level Of Ii.
1.5 In Addition To The 100% Pco Mandatory, Critical And Major Characteristics,
attributes For Plating, Hardness And Non-destructive Testing Will Be Inspected
one Hundred Percent.
1.6 Contractor Shall Develop A System For Identification Of Individual
piece Parts For Traceability Purposes. Markings Shall Not Be Permanent.
1.7 An Aql Of 1.5 Will Be Used For Class 3 Threads And Dimensions, And
geometric Feature Controls With A Tolerance Range Of .010 Or Less.
1.8 For Minor Characteristics, A Sampling Rate Determined By The Contractor
and Subject To Qar Approval Will Be Used.
1.9 The Material Covered In This Contract/purchase Order Will Be Used In A
crucial Shipboard System Enabling The Launch And/or Recovery Of Aircraft. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In A Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems Or Loss Of Aircraft. Therefore,the Material Has Been
designated As Critical Material And Special Control Procedures Are Invoked
to Ensure Receipt Of Correct Material.
1.10 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;nawc Lakehurst; Drawing Number ( ;80020; ) ;510872-2; , Revision ;n; And All Details And Specifications Referenced Therein.
1.11 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not
be Provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced
specification.
1.12 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c.
2. Applicable Documents
drawing Data=b408573 |80020| F| |a| | | |
drawing Data=mpr 1221 |80020| T| |d| | | |
drawing Data=mpr 1222 |80020| A| |d| | | |
drawing Data=mpr 1223 |80020| C| |d| | | |
drawing Data=323195 |80020| E| |a| | | |
drawing Data=323196 |80020| E| |a| | | |
drawing Data=416328 |80020| G| |a| | | |
drawing Data=416330 |80020| C| |d| | | |
drawing Data=416332 |80020| C| |a| | | |
drawing Data=418772 |80020| D| |a| | | |
drawing Data=420340 |80020| D| |d| | | |
drawing Data=510875 |80020| F| |c| | | |
drawing Data=511224 |80020| J| |d| | | |
drawing Data=514822 |80020| M| |d| | | |
drawing Data=514823 |80020| G| |d| | | |
drawing Data=514824 |80020| G| |d| | | |
3. Requirements - Not Applicable
4. Quality Assurance
unique Requirements:
1. All Records Pertaining To Alre Csi/cai Manufacture And Inspection/test Shall Be Provided To The Alre Cognizanttechnical Authority. All Records Shall Be Maintained By Lke Qa And By The Manufacturer For A Period Of Seven Years.
2. Interim Inspection Requirements: The Following Item(s) Requires An Interim Inspection At The Contractor's Location:
a. Pn 514822-1, Hook (csi):
i. Witness Of Magnetic Particle Inspection Of Area "x" And Section "d-d" Of Drawing 514822 Prior To Chromium Plating.
ii. Witness Of Dimensional Inspection In Area "x" And Section "d-d" Of Drawing 514822 Prior To Chromium Plating.
iii. Witness Of Hardness Testing In Area "x" And Section "d-d" Of Drawing 514822 Prior To Chromium Plating.
3. Alre Csi Parts Require Certification:
a. When Certified, An Alre Part Is Marked With A Material Identification Code (mic). Nawcadlke Qa Will Provide The Mic To Dcma If The Component Is Source Accepted, And After Receipt Of All Associated Data. Application Of Mic Shall Be In The Same Methodology As
the Drawing Note For Part Marking, And In Same Area As Part Marking (next To, Above, Or Below).
4. Receipt Inspection And Certification Of Sub-components:
a. P/n 514822-1 Shall Be Certified At Lakehurst.
5. Receipt Inspection And Certification Of The Top Assembly:
a. The Receipt Inspection And Certification Of The Top Assembly, P/n 510872-2, Shall Occur At Lakehurst During The Final Inspection.
6. Contractor Assist And Part Marking:
a. The Contractor Shall Assist On The Conduct Of The Inspections (both Final And Interim) Required That Are Necessary To Certify The Critical Items Specified Herein. The Contractor Shall Provide Adequate Facilities, Inspection Equipment, And Skilled Personnel,
to Support The Nawcadlke Inspector In The Conduct Of The Interim Inspection(s). The Contractor Shall Provide Gauges, Tools, Fixtures, And Jigs Necessary To Perform The Inspections. The Contractor Shall Also Provide Sufficient Rigging/material Handling Services
and Manpower To Setup/configure/operate Equipment & Machines Used To Accomplish The Inspection Task. This Contractor Assist Requirement Shall Be Applicable To 100% Of The Production Quantities. As Part Of The Mri Process, The Nawcadlke Qa Representative Will
provide, In Writing, A Certification Number Along With Direction For Marking The Critical Safety Item (csi).
quality Assurance Requirements
1. The Solicitation/contract Shall Contain The Nawcadlke Inspection Surveillance Clause As Follows:
a. N/a
b. Due To The Critical Nature Of This Item, It Is Necessary To Conduct In-process Inspections On Critical Component Features, Attributes, Or Manufacturing Processes. The Contractor Agrees To Notify Roy Janney, Roy.a.janney.civ@us.navy.mil, Of The Nawc Qa
section Code, Bl41600, Lakehurst, Nj 08733-5035 And The Pco When Material Is Scheduled For The Interim Inspection(s) That Are Identified Herein. This Notice Shall Afford The Nawcadlke Qa Representative The Option Of Being Present During The Inspection. A
minimum Of Seven (7) Working Days Is Required To Arrange The Surveillance Visit. Notification Shall Include The Following Information: Company Name, Cage Code, Phone Number, Fax Number, Contract Number, Point Of Contact, Part Nomenclature,part Number, Niin,
type Of Inspection, And Quantity Of Parts.
2. The Contractor Shall Perform Quality Conformance And Lot Sampling Inspection For All Associated Features That Are Present In The Drawings And Specifications:
a. Features/attributes/requirements Classified As Critical And Major On The Drawing(s) Or Within The Technical Specification Shall Be Inspected And Shall Have The Actual Dimensions Documented 100%;
b. Attributes For Plating, Hardness, And Non-destructive Testing Shall Be Inspected 100%;
c. Class 3 Threads, Dimensions, And Geometric Feature Controls With A Tolerance Range Of .010 Or Less Shall Be Inspected Using An Aql Of 1.5 And The General Inspection Level Ii As Defined By Ansi Z1.4.
d. Minor Characteristics: Sampling Shall Be Inspected Using An Aql Of 4.0 And The General Inspection Level Ii As Defined By Ansi Z1.4.
3. The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System Supporting The Launch And/or Recovery Of Aircraft. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In A Serious
personnel Injury, Loss Of Life, Loss Of Vital Shipboard Systems, Or Loss Of Aircraft. Therefore, The Material Has Been Designated As Critical Safety Item (csi) Material And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
4. First Article Testing:
a. First Article Testing By The Government Is Required For This Item Of Alre/se.
b. First Article Samples, All Certifications, Test Reports, And In-process Inspection Documents Needed To Substantiate Product Quality Shall Be Forwarded To The Naval Air Warfare Center Aircraft Division, Code Bl41600 B148, Hwy #547, Lakehurst, Nj 08733-5125
(attention: Drew Flast).
c. First Article Samples Will Be Evaluated Within 45 Working Days After The Date Of Receipt For Sample Quantities.
d. First Article Sample Quantities Is 1 (one); Delivered In The Uncoated Condition. First Article Results And Disposition Recommendations Will Be Provided To The Pco Via Letter.
e. Estimated Test Costs Are $5000.
5. Production Lot Special Tests: N/a
6. For Purposes Of This Tdr, The Term Ndt Shall Refer To The Following Methods: Mt - Magnetic Particle Testing, Pt - Penetrant Inspection, Ut - Ultrasonic Testing, Rt - Radiographic Testing, And Vt - Visual Testing.
7. Companies Performing Ndt Shall Be Nadcap Accredited, Or A Laboratory Accredited By One Of The Organizations Listed Below As Satisfying Iso 17025 (general Requirements For The Competence Of Testing And Calibration Laboratories). Ndt Certificates Shall Be Bear
the Symbols Of Accreditation And The Accreditation Body.
a. American Association For Laboratory Accreditation (a2la)
b. Ansi National Accreditation Board (anab)
c. International Accreditation Service, Inc (ias)
d. National Voluntary Laboratory Accreditation Program (nvlap)
e. Perry Johnson Laboratory Accreditation, Inc (pjla)
f. Canadian Association For Laboratory Accreditation Inc. (cala)
g. Standards Council Of Canada (scc)
4.1 Review Documentation As Provided Under Dd 1423 Requirements.
4.2 Critical Manufacturing Processes
( ;applies; ) Heat Treat
( ;applies; ) Welding
( ;n/a; ) Cadmium Plating
( ;n/a ; ) Engineering Chrome Plating
( ;applies; ) Nickel Chrome Plating
( ;n/a; ) Casting(s)
( ;n/a; ) Forging(s)
( ;applies; ) Mpr (material Processing Requirements)
4.3 The Test To Be Performed Under The First Article Approval Clause (far 52.209-3) Of The Contract Are Listed Below
4.3.1 Dimensional Test (special)
;close Machine Tolerances.;
4.3.2 Requirements Of:
;lke Drawing Package;
4.3.3 Form
;applies;
4.3.4 Fit
;n/a;
4.3.5 Function
;n/a;
4.3.6 Compliance With Drawing ( ;80020; ) ;510872; , Revision ;rev N ; And Specifications Referenced Therein.
4.4 In Addition To The Above Tests, The First Article(s) To Be Inspected Hereunder Shall Also Be Subjected To Those Tests Which Will Demonstrate That The Article(s) Comply With The Contract Requirements
4.5 The Contractor Shall Be Responsible For Providing The Necessary Parts And Repair Of The First Article Sample(s) During Inspection
4.6 The Contractor Shall Notify The Pco, Aco, And Qar Fourteen (14) Days Prior To Conducting The First Article Test So That The Government May Witness Such Testing.
4.6.1 The Qar Shall Be Present To Witness All First Article Testing.
4.6.2 The Following Additional Personnel Shall Witness The First Article Testing: ;roy Janney Nawcadlke Qa / Tel: (732)-323-2834
e-mail: Roy.a.janney.civ@us.navy.mil;
4.7 Disposition Of Fat Samples
4.7.1 ;n/a; Sample(s) May Be Destroyed During Testing.
4.7.2 ;applies; Unless Otherwise Provided For In The Contract, Sample(s) Shall Remain At The Contractor And May Be Considered As Production Items Under The Contract Provided The Sample(s) Can Be Refurbished To Ready For Issue Condition And Provided The
sample(s) Have Inspection Approval Of The Cognizant Dcmc Qar. Sample(s) May Be Shipped As Production Items Only After All Other Units Required Under The Contract Have Been Produced And Are Ready For Shipment.
4.8 Test Sample Coating Instructions
4.8.1 Samples Are To Be Unpainted. Corrosive Areas Are To Be Coated With A Light Preservative If Required.
4.9 Notice To Government Of Testing At The Contractors Facility.
4.9.1 Far 52.209-3 Applies
(a) The Contractor Shall Present ;one; ; Unit(s) Of The Following Cage( ;80020; ; ), Part Number ;510872-2; ; , Revision ;rev N; ; As Specified In This Contract. At Least Fourteen (14) Calendar Days Before The Beginning Of The First Article Testing, The
contractor Shall Notify The Contracting Officer, In Writing, Of The Time And Location Of The Testing So That The Government May Witness The Tests.
(b) The Contractor Shall Submit The First Article Test Report Within 15 Calendar Days From The Date Of Testing To: ;pco; ;
the Contractor Shall Mark The Report "first Article Test Report" And Cite The Contract Number And Lot/item Number. Review Documentation As Provided Under The Dd1423 Requirements.
(c) Within 45 Calendar Days After The Government Inspects The First Article, The Contracting Officer Shall Notify The Contractor, In Writing, Of The Approval, Conditional Approval, Or Disapproval Of The First Article. The Notice Of Approval, Conditional
approval, Or Disapproval Shall Not Relieve The Contractor From Complying With All Requirements Of The Specifications And All Other Terms And Conditions Of This Contract. A Notice Of Conditional Approval Shall State Any Further Action Required Of The
contractor. A Notice Of Disapproval Shall Cite Reasons For Disapproval.
(d) If The First Article Is Disapproved, The Contractor, Upon Government Request Shall Repeat Any Or All First Article Tests. After Each Request For Additional Tests, The Contractor Shall Make Any Necessary Changes, Modifications, Or Repairs To The First
article Or Select Another First Article For Testing. All Costs Related To These Tests Are To Be Borne By The Contractor, Including Any And All Costs For Additional Tests Following A Disapproval. The Contractor Shall Then Conduct The Tests And Deliver Another
report To The Government Under The Terms And Conditions And Within The Time Specified In Paragraph B Above. The Government Reserves The Right To Require An Equitable Adjustment Of The Contract Price For Any Extension Of The Delivery Schedule Or For Any
additional Costs To The Government Related To These Tests.
(e) If The Contractor Fails To Present Any First Article On Time, Or The Contracting Officer Disapproves Any First Article, The Contractor Shall Be Deemed To Have Failed To Make Delivery Within The Meaning Of The Default Clause Of This Contract.
(f) Unless Otherwise Provided In The Contract, And If The Approved First Article Is Not Consumed Or Destroyed In Testing, The Contractor May Deliver The Approved First Article As Part Of The Contract Quantity If It Meets All Contract Requirements For
acceptance.
(g) If The Government Does Not Act Within The Time Specified In Paragraph (c) Above The Contracting Officer, Shall, Upon Timely Written Request From The Contractor, Equitably Adjust Under The Changes Clause Of This Contract The Delivery Or Performance Dates
and/or The Contract Price, And Any Other Contractual Term Affected By The Delay.
(h) Before First Article Approval, The Acquisition Of Materials Or Components For, Or The Commencement Of Production Or, The Balance Of The Contract Quantity Is At The Sole Risk Of The Contractor. Before First Article Approval, The Costs Thereof Shall Not Be
allocated To This Contract For 1) Progress Payments, Or 2) Termination Settlements If The Contract Is Terminated For The Convenience Of The Government. The Contractor Is Responsible For Providing Operating And Maintenance Instructions, Spare Parts, And Repair
of The First Article During Any First Article Test.
(i) The Contractor Shall Produce Both The First Article And The Production Quantity At The Same Facility And Shall Submit A Certification To The Effect With Each First Article.
(j) The Test Report (2 Copies) Shall Be In Accordance With Mil-std-831, Unless Otherwise Specified On The Dd1423, And Shall Be Submitted Via The Cognizant Dcmc To Navsup, Attn: (cite Name And Code In Block 10.a Of The Sf33). The Dcmc Shall Provide Comments On
form Dd1222 (2 Copies) Which Shall Be Forwarded With The Test Report. Approval Of The Test Report Is The Pco's Responsibility. Upon Notification Of Approval, Condition Approval, The Aco Shall Execute The Dd250 To Indicate Government Acceptance Of The Test
report.
4.10 Alternate Offers - Waiver Of First Article Approval Requirements. (the Following Provisions Supersede Any Waiver Of First Article Approval Requirements Terms Set Forth In Clause 52.209-3 Or 52.209-4 As Appropriate)
(a) Unless Otherwise Specified In The Solicitation, Navsup Wss Reserves The Right To Waive The First Article Approval Requirements Specified Herein For Offerors Who Have Previously Furnished Identical Production Articles Accepted By The Government Or The
original Equipment Manufacturer/prime Manufacturer. An Offeror Requesting Waiver Of First Article Requirements Shall Submit Evidence With Its Offer Establishing That:
(i) The Last Production Unit Was Delivered Within Three (3) Years Of The Issue Date Of This Solicitation, And
(ii) The Production Location To Be Used For This Requirement Is The Same As Used For The Previous Production Run.
additionally, The Offeror Shall Submit A Certification, To Be Executed By The Officer Or Employee For The Offer, Stating That:
(i) The Articles To Be Provided Will Be Produced Using The Same Facilities, Processes, Sequences Of Operations And Approved Subcontractors As Those Previously Delivered And Accepted By The Government Or The Original Equipment Manufacturer/prime Manufacturer,
and
(ii) The Previous Production Units Were Manufactured Without Material Review Board Disposition Or Waiver/deviation Request Or Rejection Of Pre-production Samples For Cause.
(note: This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States And The Making Of A False, Fictitious, Or Fraudulent Certification May Render The Maker Subject To Prosecution Under Title 18, United States
code, Section 1001.)
(b) Offerors Requesting Waiver Of First Article Approval Requirements Under The Provisions Of This Clause Are Cautioned To Submit Two Prices For Articles Required Herein - One That Is Based On Compliance With The First Article Approval Requirements And
one That Is Based On A Waiver Of Such Requirements. Where An Offeror Submits Only One Price And Fails To Clearly State That The Price Is Based On Waiver Of The First Article Approval Requirements It Will Be Deemed To Be Based On Compliance With The First
article Approval Requirements
(c) In The Event Of The First Article Approval Requirement Is Granted, The Delivery Schedule For The Production Items Shall Be Reduced By The Number Of Days Designated For Delivery Of First Article Test Unit Plus The Number Of Calendar Days Indicated For The
government Notification Of Conditional Approval Or Approval. These Requirements Are Specified In The Quality Assurance Section Of This Solicitation. If The Offeror Is Unable To Meet The Desired Schedule, He Shall Insert Below The Alternate Delivery Schedule
he Offers To The Government.
Offeror's Proposed Alternate Delivery Schedule
(based On Waiver Of First Article Approval Requirements)
within Days:
item No. _____________ Quantity:_______ After Date Of Contract:_________
4.11 . Mandatory Inspection Requirements:
100% Procurement Contracting Officer (pco) Mandatory Inspection Is Required And Shall Be Accomplished At Source Under The Surveillance And Final Approval Of The Cognizant Dcmao Quality Assurance Representative (qar).
during Production, Mandatory Inspection Is Required To Be Accomplished By The Contractor As Follows:
A. Level Of Inspection (loi).
1. Critical Characteristics: 100% Inspection Shall Apply.
2. Major And Minor Characteristics: Loi Shall Be In Accordance With A Sampling Plan Acceptable To The Qar.
B. Critical Characteristics:
;roy Janney Nawcadlke Qa / Tel: (732)-323-2834
e-mail: Roy.a.janney.civ@us.navy.mil;
C. Major And Minor Characteristics
1. Shall Be Defined By The Contractor Subject To Qar Concurrence, Unless Defined On Applicable Drawings And Associated Specifications.
4.12 Special Inspection Requirements
( ;applies; ) Magnetic Particle Inspection
( ;applies; ) Surface Inspection
( ; ; ) Penetrant Inspection
( ;n/a; ) Radiographic Inspection
( ;n/a; ) Ultrsonic Inspection
( ;n/a; ) High Shock Test
( ;n/a; ) Mechanical Vibration Test
4.13 Final Inspection Requirement:due To The Critical Nature Of This Item, Representatives Of The Buying
office/and The Cognizant Field Activity, Nawc Lakehurst, Shall Be Notified By The Successful Contractor At Least 14 Days Prior To Presentation To The Dcm Qar Of The Items For Final Inspection So That They May Have The Option Of
witnessing The Final Inspection. The Contractor Shall Notify By Email Or
telefax Pco And Nawc Lakehurst Qa ;roy Janney Nawcadlke Qa / Tel: (732)-323-2834
e-mail: Roy.a.janney.civ@us.navy.mil; To Arrange For The Final Inspection.the Authority Of The Qar Shall Not Be Abrogated. If The Notification Is Not Given To Both Sites Then The Qar Shall Not Accept The Units.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
this Is A Critical Safety Item.
for Drawing Updates, See Attached Nawc Lke Drawing Update Sheet.
for Navicp Reference Only: Procurement Tdr 24-10082 Was Utilized To Build Tdp
the Components Being Acquired Under This Solicitation Have Been Classified As"critical" Requiring Engineering Source Approval By Naval Air Systems Command. Only Those Companies Who Have Been Approved Will Be Eligible For Award Under This Solicition. Any Company
not Previously Approved May Submit A Source Approval Request As Outlined Later In This Solicitation.
\
date Of First Submission=asreq
16. Remarks:
(block 12): Concurrently With Delivery Of Fat Items.
inspection/certification Data Needed To Substantiate The Quality Of The First Article Test Unit Shall Be Included In First Article Unit Packaging. The Outside Of The Package That Contains The Data Shall Be Clearly Marked "inspection/certification Data Included".
data Requirements:
a. Copies Of All Approved Requests For Variations.
b. Identification Per Drawings 510872, 323195, 323196, B408573, 416328, 416330, 416332, 418772, 420340, 510875, 511224, 514822, 514823.
c. Assembly Per Drawings 510872, 511224.
d. Design Requirements Per Note 1 Of Drawing 416328.
e. Dimensional Inspection Per Drawings 323195, 323196, B408573, 416328, 416330, 416332, 418772, 420340, 510875, 511224, 514822, 514823.
f. Surface Finish (of Bare Metal) Per Drawings 323195, 323196, 418772, 420340, 510875, 511224, 514822, 514823.
g. Heat Treatment Per Drawings 416330, 418772, 510875, 514822.
h. Magnetic Particle Inspection Per Drawings 416330, 418772, 420340, 510875, 511224, 514822, 514823.
i. Material Properties Per Drawings 323195, 323196, B408573, 416330, 416332, 418772, 420340, 510875, 511224, 514822, 514823.
j. Thread Dimensions And Designations Per Drawings B408573, 511224. Documentation Shall Include Verification That The Pitch And Functional Diameters Were 100% Inspected In Accordance With System 22 Of Fed-std-h28/20.
k. Welding Per Note 13 Of Drawing 514823.
l. Magnetic Particle Inspection Of Area "x" And Section "d-d" Of Drawing
514822 Prior To Chromium Plating.
m. Dimensional Inspection In Area "x" And Section "d-d" Of Drawing 514822 Prior To Chromium Plating.
n. Hardness Testing In Area "x" And Section "d-d" Of Drawing 514822 Prior
to Chromium Plating.
date Of First Submission=asreq
16. Remarks:
(block 12) Concurrently With Final Inspection.
data Requirements:
a. Copies Of All Approved Requests For Variations.
b. Identification Per Drawings 510872, 323195, 323196, B408573, 416328, 416330, 416332, 418772, 420340, 510875, 511224, 514822, 514823.
c. Assembly Per Drawings 510872, 511224.
d. Design Requirements Per Note 1 Of Drawing 416328.
e. Dimensional Inspection Per Drawings 323195, 323196, B408573, 416328, 416330, 416332, 418772, 420340, 510875, 511224, 514822, 514823.
f. Surface Finish (of Bare Metal) Per Drawings 323195, 323196, 418772, 420340, 510875, 511224, 514822, 514823.
g. Heat Treatment Per Drawings 416330, 418772, 510875, 514822.
h. Magnetic Particle Inspection Per Drawings 416330, 418772, 420340, 510875, 511224, 514822, 514823.
i. Material Properties Per Drawings 323195, 323196, B408573, 416330, 416332, 418772, 420340, 510875, 511224, 514822, 514823.
j. Coating Per Drawings 510875, 514822, 514823.
k. Thread Dimensions And Designations Per Drawings B408573, 511224. Documentation Shall Include Verification That The Pitch And Functional Diameters Were 100% Inspected In Accordance With System 22 Of Fed-std-h28/20.
l. Plating Per Note 8 Of Drawing 514822.
m. Welding Per Note 13 Of Drawing 514823.
n. Nitride Hardening Per Note 4 Of Drawing 420340.
o. Magnetic Particle Inspection Of Area "x" And Section "d-d" Of Drawing 514822 Prior To Chromium Plating.
p. Dimensional Inspection In Area "x" And Section "d-d" Of Drawing 514822 Prior To Chromium Plating.
q. Hardness Testing In Area "x" And Section "d-d" Of Drawing 514822 Prior To Chromium Plating.
date Of First Submission=090 Dac
16. Remarks:
(block 5) Data Requirements:
a. Weld Procedure Iaw Navsea S9074-ar-gib-010/278^ Para 4.2 Per Drawing 514823.
(block 13) Date Of Subsequent Submmision: Approval Or Reason For Disapproval Shall Be Given By Navairwarcenacdivlke Via The P.c.o. Nlt 45 Days After Disapproval.
(block 14) Addresses For Navair Codes:
navairwarcenacdivlke
code Bl14000 Bldg 596
hwy 547
joint Base Mdl, Nj 08733-5000
navairwarcenacdivlke
code Bl32300 Bldg 562
hwy 547
joint Base Mdl, Nj 08733-5000
navairwarcenacdivlke
code Bl41600 Bldg 148
hwy 547
joint Base Mdl, Nj 08733-5000
the Welding Procedures Will Be Used By The Government To Verify Contractor Designated Welding Responsibilities Implement Weld Procedures For Each Cont Ractor, Subcontractor Or Welding Entity Performing Welding On Specific Work Specifications
date Of First Submission=090 Dac
16. Remarks:
(block 5 ) Data Requirements:
a. The Weld Procedure Qualification Test Report, Including All Supporting Test Reports And Documentation, Iaw Navsea S9074-aq-gib-010/248^ Para 4.2.3 And 4.6 Drawing 514823.
(block 13) Date Of Subsequent Submmision: Approval Or Reason For Disapproval Shall Be Given By Navairwarcenacdivlke Via The P.c.o. Nlt 45 Days After Disapproval.
(block 14) Addresses For Navair Codes:
navairwarcenacdivlke
code Bl14000 Bldg 596
hwy 547
joint Base Mdl, Nj 08733-5000
navairwarcenacdivlke
code Bl32300 Bldg 562
hwy 547
joint Base Mdl, Nj 08733-5000
navairwarcenacdivlke
code Bl41600 Bldg 148
hwy 547
joint Base Mdl, Nj 08733-5000
date Of First Submission=asreq
16. Remarks:
(block 5) Contract Reference:
a. Evidence Of Welder Performance Qualification, Including Supporting Test Results And Documentation, Iaw Navsea S9074-aq-gib-010/248^ Para 5.2 Per Drawing 514823.
(block 12) Date Of First Submission - 30 Days Prior To Production.
(block 13) Provide Qualification Evidence For All Welders.
(block 14) Addresses For Navair Codes:
navairwarcenacdivlke
code Bl32300 Bldg 562
hwy 547
joint Base Mdl, Nj 08733-5000
navairwarcenacdivlke
code Bl41600 Bldg 148
hwy 547
joint Base Mdl, Nj 08733-5000
date Of First Submission=090 Dac
16. Remarks:
(block 5) Contract Referenc:
a. Evidence Of Level Iii Certification Iaw T9074-as-gib-010/271^ Para 1.6 For The Individual Who Approved The Welders Qualification Training Program Iaw Navseas9074-aq-gib-010/248 Para 5.2.3.1, Per Drawing 514823.
(block 14) Addresses For Navair Codes:
navairwarcenacdivlke
code Bl32300 Bldg 562
hwy 547
joint Base Mdl, Nj 08733-5000
navairwarcenacdivlke
code Bl41600 Bldg 148
hwy 547
joint Base Mdl, Nj 08733-5000
date Of First Submission=090 Dac
16. Remarks:
(block 5) Contract Reference:
a. Visual Inspection Written Procedure To Be Used To Visually Inspect All Welds Iaw T9074-as-gib-010/271^ Para 8.3 And 1.7 Thru 1.7.3 Per Drawing 514823.
(block 14) Addresses For Navair Codes:
navairwarcenacdivlke
code Bl32300 Bldg 562
hwy 547
joint Base Mdl, Nj 08733-5000
navairwarcenacdivlke
code Bl41600 Bldg 148
hwy 547
joint Base Mdl, Nj 08733-5000
date Of First Submission=090 Dac
16. Remarks:
(block 3) Subtitle: Welder Qualification Training Written Procedure.
(block 5) Contract Reference:
a. Evidence Of Approval Of The Welder Qualification Training Program Iaw Navseas9074-aq-gib-010/248^ Para 5.2.3.1(d), Per Drawing 514823.
(block 14) Addresses For Navair Codes:
navairwarcenacdivlke
code Bl32300 Bldg 562
hwy 547
joint Base Mdl, Nj 08733-5000
navairwarcenacdivlke
code Bl41600 Bldg 148
hwy 547
joint Base Mdl, Nj 08733-5000
date Of First Submission=090 Dac
16. Remarks:
(block 5) Contract Reference:
b. Evidence Of Maintenance Of Qualification For All Welders Iaw Navsea S9074-aqgib-010/248^ Para 5.2.11 And 5.2.12 Per Drawing 514823.
(block 14) Addresses For Navair Codes:
navairwarcenacdivlke
code Bl32300 Bldg 562
hwy 547
joint Base Mdl, Nj 08733-5000
navairwarcenacdivlke
code Bl41600 Bldg 148
hwy 547
joint Base Mdl, Nj 08733-5000
Closing Date13 Jan 2025
Tender AmountRefer Documents
1841-1850 of 1853 archived Tenders