Manpower Tenders
Manpower Tenders
Roads & Highways Department rhd Tender
Works
Manpower Supply
Bangladesh
Description: Manpower Supply For Operation & Security Perpose At Kalurghat Ferryghat Both Side For Ferry, Pooltune, Gangway And Other Structure From 1st December, 2023 To 15th December, 2023 Under Chattogram Road Division During The Year 2024-2025.
Closing Soon6 Feb 2025
Tender AmountRefer Documents
Department Of Agriculture Tender
Civil And Construction...+2Civil Works Others, Construction Material
Corrigendum : Tender Amount Updated
Philippines
Details: Description Section I. Invitation To Bid Da8-infra-2025-14 (id No. Bt-25-infra-hvcdp 39838-0007) 1. The Department Of Agriculture-regional Field Office No. 8, Through The Hvcdp-2025 Current Fund Intends To Apply The Sum Of One Million One Hundred Eighty-five Thousand Pesos Only (p1,185,000.00) Being The Approved Budget For The Contract (abc) To Payment For The Contract For “supply Of Labor And Materials For The Construction Of Greenhouse (rainshelter)”. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Regional Field Office Viii Now Invites Bid For The Above Procurement Project. Completion Of Works For The Three (3) Sites Is Required Within Seventy-two (72) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii: Instruction To Bidders. Qty Uom Desription Total Cost Supply Of Labor And Materials For The Construction Of Greenhouse (rainshelter) Scope Of Work: 1,185,000.00 One (1) Lot Location - Brgy. Calaguise, Leyte, Leyte 385,000.00 39 Pcs Galvanized Iron Pipe, Schedule 40 And Machine Bolt & Nut 350 Sq M 200 Microns Uv Polyethylene Film With One (1) Extra Roll, Alumninum Channel Profile, And Black Strap 116 Sq M. 24 Mesh Fine Net, Black Shaded Net, And Black Strap 30 Sq M Temporary Facility And Storage 2 Each Project Billboard / Signage 1 Each Recognation Plate 1 L.s. Mobilization / Demobilization 122 Sq M Clearing And Grubbing 1.4 Cu M. Structural Excavation (common Soil) 1.1 Cu M. Structural Concrete, Class A 29 Kgs Reinforcing Steel 87 Bdft Formworks/falseworks 24.19 Sq M Painting Works (metal Painting) Location - Brgy. Pangabutan, Taft, Eastern Samar 410,000.00 39 Pcs Galvanized Iron Pipe, Schedule 40 And Machine Bolt & Nut 350 Sq M 200 Microns Uv Polyethylene Film With One (1) Extra Roll, Alumninum Channel Profile, And Black Strap 116 Sq M. 24 Mesh Fine Net, Black Shaded Net, And Black Strap 30 Sq M Temporary Facility And Storage 2 Each Project Billboard / Signage 1 Each Recognation Plate 1 L.s. Mobilization / Demobilization 122 Sq M Clearing And Grubbing 1.4 Cu M. Structural Excavation (common Soil) 1.1 Cu M. Structural Concrete, Class A 29 Kgs Reinforcing Steel 87 Bdft Formworks/falseworks 24.19 Sq M Painting Works (metal Painting) Location - Brgy. Matelarag, Las Navas, Northern Samar 390,000.00 39 Pcs Galvanized Iron Pipe, Schedule 40 And Machine Bolt & Nut 350 Sq M 200 Microns Uv Polyethylene Film With One (1) Extra Roll, Alumninum Channel Profile, And Black Strap 116 Sq M. 24 Mesh Fine Net, Black Shaded Net, And Black Strap 30 Sq M Temporary Facility And Storage 2 Each Project Billboard / Signage 1 Each Recognation Plate 1 L.s. Mobilization / Demobilization 122 Sq M Clearing And Grubbing 1.4 Cu M. Structural Excavation (common Soil) 1.1 Cu M. Structural Concrete, Class A 29 Kgs Reinforcing Steel 87 Bdft Formworks/falseworks 24.19 Sq M Painting Works (metal Painting) Terms And Conditions: A During The Opening Of Bids, Bidders Shall: 1. Submit Certificate Of Project Site Inspection Issued By Farmer’s Association Or Barangay Officials Or Affidavit Of Site Inspection; 2. Submit Certificate Of Compliance To The Attached Drawings Duly Signed By The Bidder’s Authorized Representative And Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; B All Participating Bidder Must Comply With Section B Of Dpwh D.o. No. 197 Series Of 2016, Particularly In The Computation Ocm & Profit Of The Bid Amount. Use 12% For Vat Mark-up C During Post-qualification Evaluation 1. In Case Of Recomputed Bid, Bidder Shall Submit Its Revised Cost Estimates 2. Submit Pert/cpm And S-curve 3. Construction Methods 4. Manpower Schedule 5. Submit Plans, Design, And Specification Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; D Winning Bidder Shall: 1. Provide Contractor's All Risk Insurance (cari) 2. Commence Construction Works Within Seven (7) Days Upon Receipt Of Notice To Proceed (ntp); 3. Complete The Construction Of Three (3) Sites Within 72 Calendar Days; 4. Provide Necessary Tools For The Satisfactory Completion Of The Project; 5. Assume Full Responsibility From The Time Project Construction Commences Up To The Final Acceptance By Darfo 8 And Shall Be Held Responsible For Any Damage In Part Or In Whole Except Those Occasioned By Force Majeure; 6. Assign A Project Engineer (either Licensed Agricultural Engineer Or Civil Engineer) That Will Oversee The Daily Construction Activities On Site; 7. Comply With The Quality Control Program (qcp) Schedule Of Minimum Testing Requirements Of The End-user; If Applicable 8. Submit Material Test Report Or Its Equivalent Standard Certificate For Aggregate (sand & Gravel), And Cement 9. Submit Material Test Result From Accredited Testing Laboratory For Concrete, And Reinforcing Bar With Geotagged Photos If Applicable; 10 Attend Pre-construction Meeting. 11. In Case Of Time Extension Due To Unworkable Weather Condition, Submit The Request With Pag-asa Weather Report And On-site Weather Chart Within The Succeeding Month. 12. Secure And Facilitate The Necessary Permits Required For The Project Implementation. 13. Strictly Observe Construction Safety Rules And Health Program Approved By Department Of Labor And Employment (dole) During Project Implementation. E Any Delay In The Project Completion Shall Be Subjected To Liquidated Damages Equivalent To At Least 1/10 Of 1% Of The Cost Of The Unperformed Portion Of The Works For Everyday Of Delay F Be Paid Through Partial Billing Based On Validated/verified Statement Of Work Accomplishment (swa) With Geo-tagged Photos On Major Works (before, During, And After) And Inspection Report By The Da-rfo8 Inspectorate Team. 1. At Least 50% Of The Physical Accomplishment; 2. 100% Of The Physical Accomplishment, Testing And Acceptance Of The Project G Advance Payment (maximum Of 15%) Will Be Granted Upon Submission Of The Following Requirements: 1. Advance Payment Bond By The Bidder 2. On-site Evaluation Report By The Da Project Engineer H Winning Bidder Shall Submit A Snapshot Of A Business Bank Account (preferably Landbank) To Effect Payment. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information From Department Of Agriculture – Regional Field Office 8 And Inspect The Bidding Documents At The Address Given Below During Office Hours, From 8:00 Am To 5:00 Pm 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 21, 2025 To February 11, 2025 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents Amounting To Five Thousand Pesos Only (p5,000.00), Pursuant To The Latest Guidelines Issued By The Gppb. 6. The Department Of Agriculture-rfo 8 Will Hold A Pre-bid Conference On January 28, 2025, 9:00 Am (bac-secretariat Time) At Bac Office, Da-rfo8, Kanhuraw Hill, Tacloban City Through Face To Face Or Videoconferencing/webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before February 11, 2025, 9:00 Am (bac-secretariat Time). Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On February 11, 2025, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity Either Physically Or Through Videoconferencing Via Google Meet. 10. The Department Of Agriculture-rfo 8 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. Da Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 12. For Further Information, Please Refer To: Martins A. Alde Head, Bac-secretariat Department Of Agriculture, Regional Field Office-8 Kanhuraw Hill, Tacloban City Darfo8.bacsec@gmail.com Mobile No. 09061694318 Easternvisayas.da.gov.ph 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.philgeps.gov.ph Or Easternvisayas.da.gov.ph Approved By: (sgd.) Larry U. Sultan, Jd Chairman, Bids And Awards Committee
Closing Date11 Feb 2025
Tender AmountPHP 1.1 Million (USD 20.2 K)
BARANGAY MAGRAFIL GONZAGA, CAGAYAN Tender
Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Philippines
Details: Description Preface These Philippine Bidding Documents (pbds) For The Procurement Of Infrastructure Projects (hereinafter Referred To Also As The “works”) Through Competitive Bidding Have Been Prepared By The Government Of The Philippines For Use By All Branches, Agencies, Departments, Bureaus, Offices, Or Instrumentalities Of The Government, Including Government-owned And/or -controlled Corporations, Government Financial Institutions, State Universities And Colleges, Local Government Units, And Autonomous Regional Government. The Procedures And Practices Presented In This Document Have Been Developed Through Broad Experience, And Are For Mandatory Use In Projects That Are Financed In Whole Or In Part By The Government Of The Philippines Or Any Foreign Government/foreign Or International Financing Institution In Accordance With The Provisions Of The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. The Pbds Are Intended As A Model For Admeasurements (unit Prices Or Unit Rates In A Bill Of Quantities) Types Of Contract, Which Are The Most Common In Works Contracting. The Bidding Documents Shall Clearly And Adequately Define, Among Others: (i) The Objectives, Scope, And Expected Outputs And/or Results Of The Proposed Contract; (ii) The Eligibility Requirements Of Bidders; (iii) The Expected Contract Duration; And (iv) The Obligations, Duties, And/or Functions Of The Winning Bidder. Care Should Be Taken To Check The Relevance Of The Provisions Of The Pbds Against The Requirements Of The Specific Works To Be Procured. If Duplication Of A Subject Is Inevitable In Other Sections Of The Document Prepared By The Procuring Entity, Care Must Be Exercised To Avoid Contradictions Between Clauses Dealing With The Same Matter. Moreover, Each Section Is Prepared With Notes Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Shall Not Be Included In The Final Documents. The Following General Directions Should Be Observed When Using The Documents: A. All The Documents Listed In The Table Of Contents Are Normally Required For The Procurement Of Infrastructure Projects. However, They Should Be Adapted As Necessary To The Circumstances Of The Particular Project. B. Specific Details, Such As The Continuation Of Peri- Meter Fence And “address For Bid Submission,” Should Be Furnished In The Instructions To Bidders, Bid Data Sheet, And Special Conditions Of Contract. The Final Documents Should Contain Neither Blank Spaces Nor Options. C. This Preface And The Footnotes Or Note In Italics Included In The Invitation To Bid, Bds, General Conditions Of Contract, Special Conditions Of Contract, Specifications, Drawings, And Bill Of Quantities Are Not Part Of The Text Of The Final Document, Although They Contain Instructions That The Procuring Entity Should Strictly Follow. D. The Cover Should Be Modified As Required To Identify The Bidding Documents As To The Names Of The Project, Contract, And Procuring Entity, In Addition To Date Of Issue. E. Modifications For Specific Procurement Project Details Should Be Provided In The Special Conditions Of Contract As Amendments To The Conditions Of Contract. For Easy Completion, Whenever Reference Has To Be Made To Specific Clauses In The Bid Data Sheet Or Special Conditions Of Contract, These Terms Shall Be Printed In Bold Typeface On Sections I (instructions To Bidders) And Iii (general Conditions Of Contract), Respectively. F. For Guidelines On The Use Of Bidding Forms And The Procurement Of Foreignassisted Projects, These Will Be Covered By A Separate Issuance Of The Government Procurement Policy Board. Table Of Contents Glossary Of Terms, Abbreviations, And Acronyms 5 Section I. Invitation To Bid 7 Section Ii. Instructions To Bidders 10 1. Scope Of Bid 10 2. Funding Information 10 3. Bidding Requirements 11 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices 11 5. Eligible Bidders 11 6. Origin Of Associated Goods 12 7. Subcontracts 12 8. Pre-bid Conference 13 9. Clarification And Amendment Of Bidding Documents 13 10. Documents Comprising The Bid: Eligibility And Technical Components 13 11. Documents Comprising The Bid: Financial Component 14 12. Alternative Bids 14 13. Bid Prices 14 14. Bid And Payment Currencies 14 15. Bid Security 15 16. Sealing And Marking Of Bids 15 17. Deadline For Submission Of Bids 15 18. Opening And Preliminary Examination Of Bids 15 19. Detailed Evaluation And Comparison Of Bids 16 20. Post Qualification 16 21. Signing Of The Contract 16 Section Iii. Bid Data Sheet 17 Section Iv. General Conditions Of Contract 18 1. Scope Of Contract 19 2. Sectional Completion Of Works 19 3. Possession Of Site 19 4. The Contractor’s Obligations 19 5. Performance Security 20 6. Site Investigation Reports 20 7. Warranty 20 8. Liability Of The Contractor 20 9. Termination For Other Causes 20 10. Dayworks 21 11. Program Of Work 21 12. Instructions, Inspections And Audits 21 13. Advance Payment 21 14. Progress Payments 21 15. Operating And Maintenance Manuals 22 Section V. Special Conditions Of Contract 23 Section Vi. Specifications 26 Section Vii. Drawings 28 Section Viii. Bill Of Quantities 29 Section Ix. Checklist Of Technical And Financial Documents 33 Glossary Of Terms, Abbreviations, And Acronyms Abc – Approved Budget For The Contract. Arcc – Allowable Range Of Contract Cost. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Cda – Cooperative Development Authority. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Contractor – Is A Natural Or Juridical Entity Whose Proposal Was Accepted By The Procuring Entity And To Whom The Contract To Execute The Work Was Awarded. Contractor As Used In These Bidding Documents May Likewise Refer To A Supplier, Distributor, Manufacturer, Or Consultant. Cpi – Consumer Price Index. Dole – Department Of Labor And Employment. Dti – Department Of Trade And Industry. Foreign-funded Procurement Or Foreign-assisted Project – Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Pcab – Philippine Contractors Accreditation Board. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Un – United Nations. Section I. Invitation To Bid Notes On The Invitation To Bid The Invitation To Bid (ib) Provides Information That Enables Potential Bidders To Decide Whether To Participate In The Procurement At Hand. The Ib Shall Be Posted In Accordance With Section 21.2 Of The 2016 Revised Irr Of Ra No. 9184. Apart From The Essential Items Listed In The Bidding Documents, The Ib Should Also Indicate The Following: A. The Date Of Availability Of The Bidding Documents, Which Shall Be From The Time The Ib Is First Advertised/posted Until The Deadline For The Submission And Receipt Of Bids; B. The Place Where The Bidding Documents May Be Acquired Or The Website Where It May Be Downloaded; C. The Deadline For The Submission And Receipt Of Bids; And D. Any Important Bid Evaluation Criteria. The Ib Should Be Incorporated Into The Bidding Documents. The Information Contained In The Ib Must Conform To The Bidding Documents And In Particular To The Relevant Information In The Bid Data Sheet. Republic Of The Philippines Province Of Cagayan Municipality Of Gonzaga Barangay Magrafil Invitation To Bid For The Backfilling & Concreting Of Multi-purpose Gym At Magrafil, Gonzaga, Cagayan 1. The Backfilling & Concreting Of Multi-purpose Gym At Magrafil, Gonzaga, Cagayan, Through The Funding Intends To Apply The Sum Of Three Hundred Twenty Six Thousand Two Hundred Pesos (326,200.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Magrafil -infra-001-2025. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Bid Opening. 2. The Backfilling & Concreting Of Multi-purpose Gym Magrafil, Gonzaga, Cagayan. Completion Of The Works Is Required 30 Days Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Nondiscretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information On The Backfilling & Concreting Of Multi-purpose Gym At Magrafil, Gonzaga, Cagayan. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 20, 2025 From Given Address And Website/s Below {insert If Necessary: And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Hundred Pesos. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person Or Via Email. 6. The Bac Will Hold A Pre-bid Conference On [january 28, 2025] At [lnb Hall Municipal Compound Barangay Magrafil, Gonzaga, Cagayan] {[insert If Applicable] And/or Through Videoconferencing/webcasting Via [insert Website, Application Or Technology To Be Used].}, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On January 28, 2025 At 9:14 Am At The Given Address At {lnb Hall, Municipal Compound Barangay Smart Gonzaga, Cagayan] And/or Through [insert Website, Application, Or Technology To Be Used].} Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. [insert Such Other Necessary Information Deemed Relevant By The Procuring Entity Such As The Use Of A Back-up Data Or Cloud Storage For Large Files Uploaded For Online Bid Submissions] 11. The Backfilling & Concreting Of Multi-purpose Gym Magrafil, Gonzaga, Cagayan Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Flordelisa I. Javier Secretariat Bids And Awards Committee Barangay Hall Barangay Magrafil, Gonzaga, Cagayan Email: Lisaidmilao32@gmail.com 09999779655-09065742240 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: [indicate Websites] [if Applicable] For Online Bid Submission: [indicate Website] January 16, 2025 ________________________________ Wilfrey Loy S. Idmilao Bac Chairperson Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, [barangay Magrafil, Gonzaga, Cagayan] Invites Bids For The Backfilling & Concreting Of Multi-purpose Gym Magrafil, Gonzaga, Cagayan, With Project Identification Number Magrafil-infra-001-2025. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project (referred To Herein As “project”) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 2025 In The Amount Of Three Hundred Twenty Six Thousand Two Hundred Pesos. 2.2. The Source Of Funding Is: [if An Early Procurement Activity, Select One And Delete Others:] A. Nga, The National Expenditure Program. B. Gocc And Gfis, The Proposed Corporate Operating Budget. C. Lgus, The Proposed Local Expenditure Program. [if Not An Early Procurement Activity, Select One And Delete Others:] A. Nga, The General Appropriations Act Or Special Appropriations. B. Gocc And Gfis, The Corporate Operating Budget. C. Lgus, The Annual Or Supplemental Budget, As Approved By The Sangguniang. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: [select One, Delete Other/s] A. Subcontracting Is Allowed. The Portions Of Project And The Maximum Percentage Allowed To Be Subcontracted Are Indicated In The Bds, Which Shall Not Exceed Fifty Percent (50%) Of The Contracted Works. B. Subcontracting Is Not Allowed. 7.1. [if Procuring Entity Has Determined That Subcontracting Is Allowed During The Bidding , State:] The Bidder Must Submit Together With Its Bid The Documentary Requirements Of The Subcontractor(s) Complying With The Eligibility Criterial Stated In Itb Clause 5 In Accordance With Section 23.4 Of The 2016 Revised Irr Of Ra No. 9184 Pursuant To Section 23.1 Thereof. 7.2. [if Subcontracting Is Allowed During The Contract Implementation Stage, State:] The Supplier May Identify Its Subcontractor During The Contract Implementation Stage. Subcontractors Identified During The Bidding May Be Changed During The Implementation Of This Contract. Subcontractors Must Submit The Documentary Requirements Under Section 23.1 Of The 2016 Revised Irr Of Ra No. 9184 And Comply With The Eligibility Criteria Specified In Itb Clause 5 To The Implementing Or End-user Unit. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address {[insert If Applicable] And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: [select One, Delete Other/s] A. Philippine Pesos. B. [indicate Currency If Procurement Involves A Foreign-denominated Bid As Allowed By The Procuring Entity, Which Shall Be Tradeable Or Acceptable By The Bsp.] 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until [indicate Date]. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Notes On The Bid Data Sheet (bds) The Bid Data Sheet (bds) Consists Of Provisions That Supplement, Amend, Or Specify In Detail, Information, Or Requirements Included In The Itb Found In Section Ii, Which Are Specific To Each Procurement. This Section Is Intended To Assist The Procuring Entity In Providing The Specific Information In Relation To Corresponding Clauses In The Itb And Has To Be Prepared For Each Specific Procurement. The Procuring Entity Should Specify In The Bds Information And Requirements Specific To The Circumstances Of The Procuring Entity, The Processing Of The Procurement, And The Bid Evaluation Criteria That Will Apply To The Bids. In Preparing The Bds, The Following Aspects Should Be Checked: A. Information That Specifies And Complements Provisions Of The Itb Must Be Incorporated. B. Amendments And/or Supplements, If Any, To Provisions Of The Itb As Necessitated By The Circumstances Of The Specific Procurement, Must Also Be Incorporated. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: [provide Description/clarification Of What Are Major Categories Of Work]. 7.1 [specify The Portions Of Works And The Maximum Percentage Allowed To Be Subcontracted, Which Shall Not Be Significant Or Material Components Of The Project As Determined By The Procuring Entity.] 10.3 [specify If Another Contractor License Or Permit Is Required. ] 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel General Experience Relevant Experience 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units 12 [insert Value Engineering Clause If Allowed.] 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than __________ [insert Two Percent (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less Than __________ [insert Five Percent (5%) Of Abc] If Bid Security Is In Surety Bond. 19.2 Partial Bids Are Allowed, As Follows: [insert Grouping Of Lots By Specifying The Items And The Quantity For Every Identified Lot.] 20 [list Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It, E.g. Environmental Compliance Certificate, Certification That The Project Site Is Not Within A Geohazard Zone, Etc.] 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And Scurve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And Other Acceptable Tools Of Project Scheduling. Section Iv. General Conditions Of Contract Notes On The General Conditions Of Contract The General Conditions Of Contract (gcc) In This Section, Read In Conjunction With The Special Conditions Of Contract In Section V And Other Documents Listed Therein, Should Be A Complete Document Expressing All The Rights And Obligations Of The Parties. Matters Governing Performance Of The Contractor, Payments Under The Contract, Or Matters Affecting The Risks, Rights, And Obligations Of The Parties Under The Contract Are Included In The Gcc And Special Conditions Of Contract. Any Complementary Information, Which May Be Needed, Shall Be Introduced Only Through The Special Conditions Of Contract. 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 4.1. The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 4.2. If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Notes On The Special Conditions Of Contract Similar To The Bds, The Clauses In This Section Are Intended To Assist The Procuring Entity In Providing Contract-specific Information In Relation To Corresponding Clauses In The Gcc Found In Section Iv. The Special Conditions Of Contract (scc) Complement The Gcc, Specifying Contractual Requirements Linked To The Special Circumstances Of The Procuring Entity, The Procuring Entity’s Country, The Sector, And The Works Procured. In Preparing This Section, The Following Aspects Should Be Checked: A. Information That Complements Provisions Of The Gcc Must Be Incorporated. B. Amendments And/or Supplements To Provisions Of The Gcc As Necessitated By The Circumstances Of The Specific Purchase, Must Also Be Incorporated. However, No Special Condition Which Defeats Or Negates The General Intent And Purpose Of The Provisions Of The Gcc Should Be Incorporated Herein. Special Conditions Of Contract Gcc Clause 2 [if Different Dates Are Specified For Completion Of The Works By Section, I.e. “sectional Completion,” These Dates Should Be Listed Here.] 4.1 [specify The Schedule Of Delivery Of The Possession Of The Site To The Contractor, Whether Full Or In Part.] 6 The Site Investigation Reports Are: [list Here The Required Site Investigation Reports.] 7.2 [select One, Delete The Other.] [in Case Of Permanent Structures, Such As Buildings Of Types 4 And 5 As Classified Under The National Building Code Of The Philippines And Other Structures Made Of Steel, Iron, Or Concrete Which Comply With Relevant Structural Codes (e.g., Dpwh Standard Specifications), Such As, But Not Limited To, Steel/concrete Bridges, Flyovers, Aircraft Movement Areas, Ports, Dams, Tunnels, Filtration And Treatment Plants, Sewerage Systems, Power Plants, Transmission And Communication Towers, Railway System, And Other Similar Permanent Structures:] Fifteen (15) Years. [in Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures:] Five (5) Years. [in Case Of Other Structures, Such As Bailey And Wooden Bridges, Shallow Wells, Spring Developments, And Other Similar Structures:] Two (2) Years. 10 [select One, Delete The Other:] A. Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. B. No Dayworks Are Applicable To The Contract. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within [insert Number] Days Of Delivery Of The Notice Of Award. 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is Three Hundred Six Thousand Pesos. 13 The Amount Of The Advance Payment Is [insert Amount As Percentage Of The Contract Price That Shall Not Exceed 15% Of The Total Contract Price And Schedule Of Payment]. 14 [if Allowed By The Procuring Entity, State:] Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Be Included For Payment. 15.1 The Date By Which Operating And Maintenance Manuals Are Required Is [date]. The Date By Which “as Built” Drawings Are Required Is [date]. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is [amount In Local Currency]. Section Vi. Specifications Notes On Specifications A Set Of Precise And Clear Specifications Is A Prerequisite For Bidders To Respond Realistically And Competitively To The Requirements Of The Procuring Entity Without Qualifying Or Conditioning Their Bids. In The Context Of International Competitive Bidding, The Specifications Must Be Drafted To Permit The Widest Possible Competition And, At The Same Time, Present A Clear Statement Of The Required Standards Of Workmanship, Materials, And Performance Of The Goods And Services To Be Procured. Only If This Is Done Will The Objectives Of Economy, Efficiency, And Fairness In Procurement Be Realized, Responsiveness Of Bids Be Ensured, And The Subsequent Task Of Bid Evaluation Facilitated. The Specifications Should Require That All Goods And Materials To Be Incorporated In The Works Be New, Unused, Of The Most Recent Or Current Models, And Incorporate All Recent Improvements In Design And Materials Unless Provided Otherwise In The Contract. Samples Of Specifications From Previous Similar Projects Are Useful In This Respect. The Use Of Metric Units Is Mandatory. Most Specifications Are Normally Written Specially By The Procuring Entity Or Its Representative To Suit The Works At Hand. There Is No Standard Set Of Specifications For Universal Application In All Sectors In All Regions, But There Are Established Principles And Practices, Which Are Reflected In These Pbds. There Are Considerable Advantages In Standardizing General Specifications For Repetitive Works In Recognized Public Sectors, Such As Highways, Ports, Railways, Urban Housing, Irrigation, And Water Supply, In The Same Country Or Region Where Similar Conditions Prevail. The General Specifications Should Cover All Classes Of Workmanship, Materials, And Equipment Commonly Involved In Construction, Although Not Necessarily To Be Used In A Particular Works Contract. Deletions Or Addenda Should Then Adapt The General Specifications To The Particular Works. Care Must Be Taken In Drafting Specifications To Ensure That They Are Not Restrictive. In The Specification Of Standards For Goods, Materials, And Workmanship, Recognized International Standards Should Be Used As Much As Possible. Where Other Particular Standards Are Used, Whether National Standards Or Other Standards, The Specifications Should State That Goods, Materials, And Workmanship That Meet Other Authoritative Standards, And Which Ensure Substantially Equal Or Higher Quality Than The Standards Mentioned, Will Also Be Acceptable. The Following Clause May Be Inserted In The Scc. Sample Clause: Equivalency Of Standards And Codes Wherever Reference Is Made In The Contract To Specific Standards And Codes To Be Met By The Goods And Materials To Be Furnished, And Work Performed Or Tested, The Provisions Of The Latest Current Edition Or Revision Of The Relevant Standards And Codes In Effect Shall Apply, Unless Otherwise Expressly Stated In The Contract. Where Such Standards And Codes Are National, Or Relate To A Particular Country Or Region, Other Authoritative Standards That Ensure A Substantially Equal Or Higher Quality Than The Standards And Codes Specified Will Be Accepted Subject To The Procuring Entity’s Representative’s Prior Review And Written Consent. Differences Between The Standards Specified And The Proposed Alternative Standards Shall Be Fully Described In Writing By The Contractor And Submitted To The Procuring Entity’s Representative At Least Twenty-eight (28) Days Prior To The Date When The Contractor Desires The Procuring Entity’s Representative’s Consent. In The Event The Procuring Entity’s Representative Determines That Such Proposed Deviations Do Not Ensure Substantially Equal Or Higher Quality, The Contractor Shall Comply With The Standards Specified In The Documents. These Notes Are Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Should Not Be Included In The Final Bidding Documents. Section Vii. Drawings Section Viii. Bill Of Quantities Notes On The Bill Of Quantities Objectives The Objectives Of The Bill Of Quantities Are: A. To Provide Sufficient Information On The Quantities Of Works To Be Performed To Enable Bids To Be Prepared Efficiently And Accurately; And B. When A Contract Has Been Entered Into, To Provide A Priced Bill Of Quantities For Use In The Periodic Valuation Of Works Executed. In Order To Attain These Objectives, Works Should Be Itemized In The Bill Of Quantities In Sufficient Detail To Distinguish Between The Different Classes Of Works, Or Between Works Of The Same Nature Carried Out In Different Locations Or In Other Circumstances Which May Give Rise To Different Considerations Of Cost. Consistent With These Requirements, The Layout And Content Of The Bill Of Quantities Should Be As Simple And Brief As Possible. Daywork Schedule A Daywork Schedule Should Be Included Only If The Probability Of Unforeseen Work, Outside The Items Included In The Bill Of Quantities, Is High. To Facilitate Checking By The Entity Of The Realism Of Rates Quoted By The Bidders, The Daywork Schedule Should Normally Comprise The Following: A. A List Of The Various Classes Of Labor, Materials, And Constructional Plant For Which Basic Daywork Rates Or Prices Are To Be Inserted By The Bidder, Together With A Statement Of The Conditions Under Which The Contractor Will Be Paid For Work Executed On A Daywork Basis. B. Nominal Quantities For Each Item Of Daywork, To Be Priced By Each Bidder At Daywork Rates As Bid. The Rate To Be Entered By The Bidder Against Each Basic Daywork Item Should Include The Contractor’s Profit, Overheads, Supervision, And Other Charges. Provisional Sums A General Provision For Physical Contingencies (quantity Overruns) May Be Made By Including A Provisional Sum In The Summary Bill Of Quantities. Similarly, A Contingency Allowance For Possible Price Increases Should Be Provided As A Provisional Sum In The Summary Bill Of Quantities. The Inclusion Of Such Provisional Sums Often Facilitates Budgetary Approval By Avoiding The Need To Request Periodic Supplementary Approvals As The Future Need Arises. Where Such Provisional Sums Or Contingency Allowances Are Used, The Scc Should State The Manner In Which They Will Be Used, And Under Whose Authority (usually The Procuring Entity’s Representative’s). The Estimated Cost Of Specialized Work To Be Carried Out, Or Of Special Goods To Be Supplied, By Other Contractors Should Be Indicated In The Relevant Part Of The Bill Of Quantities As A Particular Provisional Sum With An Appropriate Brief Description. A Separate Procurement Procedure Is Normally Carried Out By The Procuring Entity To Select Such Specialized Contractors. To Provide An Element Of Competition Among The Bidders In Respect Of Any Facilities, Amenities, Attendance, Etc., To Be Provided By The Successful Bidder As Prime Contractor For The Use And Convenience Of The Specialist Contractors, Each Related Provisional Sum Should Be Followed By An Item In The Bill Of Quantities Inviting The Bidder To Quote A Sum For Such Amenities, Facilities, Attendance, Etc. Signature Box A Signature Box Shall Be Added At The Bottom Of Each Page Of The Bill Of Quantities Where The Authorized Representative Of The Bidder Shall Affix His Signature. Failure Of The Authorized Representative To Sign Each And Every Page Of The Bill Of Quantities Shall Be A Cause For Rejection Of His Bid. These Notes For Preparing A Bill Of Quantities Are Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Should Not Be Included In The Final Documents. Section Ix. Checklist Of Technical And Financial Documents Notes On The Checklist Of Technical And Financial Documents The Prescribed Documents In The Checklist Are Mandatory To Be Submitted In The Bid, But Shall Be Subject To The Following: A. Gppb Resolution No. 09-2020 On The Efficient Procurement Measures During A State Of Calamity Or Other Similar Issuances That Shall Allow The Use Of Alternate Documents In Lieu Of The Mandated Requirements; Or B. Any Subsequent Gppb Issuances Adjusting The Documentary Requirements After The Effectivity Of The Adoption Of The Pbds. The Bac Shall Be Checking The Submitted Documents Of Each Bidder Against This Checklist To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion Pursuant To Section 30 Of The 2016 Revised Irr Of Ra No. 9184. Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages); Or ⬜ (b) Registration Certificate From Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives Or Its Equivalent Document; And ⬜ (c) Mayor’s Or Business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas; And ⬜ (e) Tax Clearance Per E.o. No. 398, S. 2005, As Finally Reviewed And Approved By The Bureau Of Internal Revenue (bir). Technical Documents ⬜ (f) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (g) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (h) Philippine Contractors Accreditation Board (pcab) License; Or Special Pcab License In Case Of Joint Ventures; And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (i) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And (j) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (k) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (l) The Prospective Bidder’s Audited Financial Statements, Showing, Among Others, The Prospective Bidder’s Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; And ⬜ (m) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (n) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (o) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (p) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (q) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (r) Cash Flow By Quarter.
Closing Date18 Feb 2025
Tender AmountPHP 326.2 K (USD 5.5 K)
Department Of Agriculture Tender
Civil And Construction...+1Construction Material
Philippines
Details: Description Section I. Invitation To Bid Da8-infra-2025-15 (id No. Bt-25-infra-hvcdp 39838-0003) 1. The Department Of Agriculture-regional Field Office No. 8, Through The Hvcdp-2025 Current Fund Intends To Apply The Sum Of One Million Two Hundred Thousand Pesos Only (p1,200,000.00) Being The Approved Budget For The Contract (abc) To Payment For The Contract For “supply Of Labor And Materials For The Construction Of 4 Units Cacao Dryer Located At (i) Brgy. Apolonia, Paranas, Samar, (ii) Brgy. Nenita, Mondragon, Northern Samar, (iii) Brgy. Juangon, Malitbog, Southern Leyte, And (iv) Brgy. Tongonan, Ormoc City, Leyte”. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Regional Field Office Viii Now Invites Bid For The Above Procurement Project. Completion Of Works For The Four (4) Sites Is Required Within Eighty (80) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii: Instruction To Bidders. Qty Uom Desription Total Cost Supply Of Labor And Materials For The Construction Of 4 Units Cacao Dryer Located At (i) Brgy. Apolonia, Paranas, Samar, (ii) Brgy. Nenita, Mondragon, Northern Samar, (iii) Brgy. Juangon, Malitbog, Southern Leyte, And (iv) Brgy. Tongonan, Ormoc City, Leyte Scope Of Work: 1,200,000.00 Location: Brgy. Apolonia, Paranas, Samar 300,000.00 Special Items 1 L.s. 200 Microns Uv Film, 5mm Pe Foam Insulator, Rubber Proctection, And 1" Aluminum Channel Lock & Wiggle Wire, Insect Mesh 30 1 L.s. Galvanized Iron Pipes, Schedule 40 12 Each Dryer Tray 28.47 Sq M Plain G.i. Sheet General Requirements 30 Sqm Temporary Facility & Storage 3 Each Project Billboard & Recognation Plate 1 L.s. Mobilization And Demobilization Earthworks 30 Sq. M. Clearing And Grubbing 0.4 Cu M. Structural Excavation (common Soil) Structural Concrete 0.2 Cu M. Structural Concrete, Class A Mixture 21 Kgs Reinforcing Steel 5.03 Sq M Falseworks And Formworks Metal Structures 1 L.s. Metal Structures (tubular Square Steel, And Base Plate) 11 Sq M Corrugated Metal Roofing Ga26 Carpentry And Joinery Works 56 Bd Ft Wood Floor Frame (good Lumber) And 1" Thk Marine Plyboard) Painting Works 21.37 Sq M Painting Works (steel) Electrical Works 1 L.s. Circuit Break, Conduits, Boxes, Fittings, And Electrical Wires Mechanical Works 5 Each Ventilation Equipment (axial Type Blower & Hygrometer) Location: Brgy. Nenita, Mondragon, Northern Samar 300,000.00 Special Items 1 L.s. 200 Microns Uv Film, 5mm Pe Foam Insulator, Rubber Proctection, And 1" Aluminum Channel Lock & Wiggle Wire, Insect Mesh 30 1 L.s. Galvanized Iron Pipes, Schedule 40 12 Each Dryer Tray 28.47 Sq M Plain G.i. Sheet General Requirements 30 Sqm Temporary Facility & Storage 3 Each Project Billboard & Recognation Plate 1 L.s. Mobilization And Demobilization Earthworks 30 Sq. M. Clearing And Grubbing 0.4 Cu M. Structural Excavation (common Soil) Structural Concrete 0.2 Cu M. Structural Concrete, Class A Mixture 21 Kgs Reinforcing Steel 5.03 Sq. M. Falseworks And Formworks Metal Structures 1 L.s. Metal Structures (tubular Square Steel, And Base Plate) 11 Sq. M. Corrugated Metal Roofing Ga26 Carpentry And Joinery Works 56 Bd Ft Wood Floor Frame (good Lumber) And 1" Thk Marine Plyboard) Painting Works 21.37 Sq. M. Painting Works (steel) Electrical Works 1 L.s. Circuit Break, Conduits, Boxes, Fittings, And Electrical Wires Mechanical Works 5 Each Ventilation Equipment (axial Type Blower & Hygrometer) Location: Brgy. Juangon. Malitbog, Southern Leyte 300,000.00 Special Items 1 L.s. 200 Microns Uv Film, 5mm Pe Foam Insulator, Rubber Proctection, And 1" Aluminum Channel Lock & Wiggle Wire, Insect Mesh 30 1 L.s. Galvanized Iron Pipes, Schedule 40 12 Each Dryer Tray 28.47 Sq M Plain G.i. Sheet General Requirements 30 Sqm Temporary Facility & Storage 3 Each Project Billboard & Recognation Plate 1 L.s. Mobilization And Demobilization Earthworks 30 Sqm Clearing And Grubbing 0.4 Cu M. Structural Excavation (common Soil) Structural Concrete 0.2 Cu M. Structural Concrete, Class A Mixture 21 Kgs Reinforcing Steel 5.03 Sq M Falseworks And Formworks Metal Structures 1 L.s. Metal Structures (tubular Square Steel, And Base Plate) 11 Sq M Corrugated Metal Roofing Ga26 Carpentry And Joinery Works 56 Bd Ft Wood Floor Frame (good Lumber) And 1" Thk Marine Plyboard) Painting Works 21.37 Sq M Painting Works (steel) Electrical Works 1 L.s. Circuit Break, Conduits, Boxes, Fittings, And Electrical Wires Mechanical Works 5 Each Ventilation Equipment (axial Type Blower & Hygrometer) Location: Brgy. Tongonan, Ormoc City, Leyte 300,000.00 Special Items 1 L.s. 200 Microns Uv Film, 5mm Pe Foam Insulator, Rubber Proctection, And 1" Aluminum Channel Lock & Wiggle Wire, Insect Mesh 30 1 L.s. Galvanized Iron Pipes, Schedule 40 12 Each Dryer Tray 28.47 Sq M Plain G.i. Sheet General Requirements 30 Sq M Temporary Facility & Storage 3 Each Project Billboard & Recognation Plate 1 L.s. Mobilization And Demobilization Earthworks 30 Sq. M. Clearing And Grubbing 0.4 Cu M. Structural Excavation (common Soil) Structural Concrete 0.2 Cu M. Structural Concrete, Class A Mixture 21 Kgs Reinforcing Steel 5.03 Sq M Falseworks And Formworks Metal Structures 1 L.s. Metal Structures (tubular Square Steel, And Base Plate) 11 Sq M Corrugated Metal Roofing Ga26 Carpentry And Joinery Works 56 Bd Ft Wood Floor Frame (good Lumber) And 1" Thk Marine Plyboard) Painting Works 21.37 Sq M Painting Works (steel) Electrical Works 1 L.s. Circuit Break, Conduits, Boxes, Fittings, And Electrical Wires Mechanical Works 5 Each Ventilation Equipment (axial Type Blower & Hygrometer) Terms And Conditions: A During The Opening Of Bids, Bidders Shall: 1. Submit Certificate Of Project Site Inspection Issued By Farmer’s Association Or Barangay Officials Or Affidavit Of Site Inspection; 2. Submit Certificate Of Compliance To The Attached Drawings Duly Signed By The Bidder’s Authorized Representative And Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; B All Participating Bidder Must Comply With Section B Of Dpwh D.o. No. 197 Series Of 2016, Particularly In The Computation Ocm & Profit Of The Bid Amount. Use 12% For Vat Mark-up C During Post-qualification Evaluation 1. In Case Of Recomputed Bid, Bidder Shall Submit Its Revised Cost Estimates 2. Submit Pert/cpm And S-curve 3. Construction Methods 4. Manpower Schedule 5. Submit Plans, Design, And Specification Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; D Winning Bidder Shall: 1. Provide Contractor's All Risk Insurance (cari) 2. Commence Construction Works Within Seven (7) Days Upon Receipt Of Notice To Proceed (ntp); 3. Complete The Construction Of Four (4) Sites Within 80 Calendar Days; 4. Provide Necessary Tools For The Satisfactory Completion Of The Project; 5. Assume Full Responsibility From The Time Project Construction Commences Up To The Final Acceptance By Darfo 8 And Shall Be Held Responsible For Any Damage In Part Or In Whole Except Those Occasioned By Force Majeure; 6. Assign A Project Engineer (either Licensed Agricultural Engineer Or Civil Engineer) That Will Oversee The Daily Construction Activities On Site; 7. Comply With The Quality Control Program (qcp) Schedule Of Minimum Testing Requirements Of The End-user; 8. Submit Material Test Report Or Its Equivalent Standard Certificate For Aggregate (sand & Gravel), And Cement 9. Submit Material Test Result From Accredited Testing Laboratory For Concrete, And Reinforcing Bar With Geotagged Photos, If Applicable; 10 Attend Pre-construction Meeting. 11. In Case Of Time Extension Due To Unworkable Weather Condition, Submit The Request With Pag-asa Weather Report And On-site Weather Chart Within The Succeeding Month. 12. Secure And Facilitate The Necessary Permits Required For The Project Implementation. 13. Strictly Observe Construction Safety Rules And Health Program Approved By Department Of Labor And Employment (dole) During Project Implementation. E Any Delay In The Project Completion Shall Be Subjected To Liquidated Damages Equivalent To At Least 1/10 Of 1% Of The Cost Of The Unperformed Portion Of The Works For Everyday Of Delay F Be Paid Through Partial Billing Based On Validated/verified Statement Of Work Accomplishment (swa) With Geo-tagged Photos On Major Works (before, During, And After) And Inspection Report By The Da-rfo8 Inspectorate Team. 1. 100% Of The Physical Accomplishment, Testing And Acceptance Of The Project G Advance Payment (maximum Of 15%) Will Be Granted Upon Submission Of The Following Requirements: 1. Advance Payment Bond By The Bidder 2. On-site Evaluation Report By The Da Project Engineer H Winning Bidder Shall Submit A Snapshot Of A Business Bank Account (preferably Landbank) To Effect Payment. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information From Department Of Agriculture – Regional Field Office 8 And Inspect The Bidding Documents At The Address Given Below During Office Hours, From 8:00 Am To 5:00 Pm 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 21, 2025 To February 11, 2025 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents Amounting To Five Thousand Pesos Only (p5,000.00), Pursuant To The Latest Guidelines Issued By The Gppb. 6. The Department Of Agriculture-rfo 8 Will Hold A Pre-bid Conference On January 28, 2025, 9:00 Am (bac-secretariat Time) At Bac Office, Da-rfo8, Kanhuraw Hill, Tacloban City Through Face To Face Or Videoconferencing/webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before February 11, 2025, 9:00 Am (bac-secretariat Time). Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On February 11, 2025, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity Either Physically Or Through Videoconferencing Via Google Meet. 10. The Department Of Agriculture-rfo 8 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. Da Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 12. For Further Information, Please Refer To: Martins A. Alde Head, Bac-secretariat Department Of Agriculture, Regional Field Office-8 Kanhuraw Hill, Tacloban City Darfo8.bacsec@gmail.com Mobile No. 09061694318 Easternvisayas.da.gov.ph 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.philgeps.gov.ph Or Easternvisayas.da.gov.ph Approved By: (sgd.) Larry U. Sultan, Jd Chairman, Bids And Awards Committee
Closing Date11 Feb 2025
Tender AmountPHP 1.2 Million (USD 20.4 K)
Municipality Of El Nido, Palawan Tender
Automobiles and Auto Parts
Corrigendum : Closing Date Modified
Philippines
Details: Description 1. The Municipal Government Of El Nido, Through The Cy 2024 General Fund - Continuing Intends To Apply The Sum Of One Million Five Hundred Thousand Pesos (₱ 1,500,000.00) Being The Abc To Payments Under The Contract For Negotiated Procurement For Supply And Delivery Of Pick-up For Patrol Operation/2024-10-0902. Bids Received In Excess Of The Abc And Cost Per Unit/item Shall Be Automatically Rejected At Bid Opening. 2. The Municipal Government Of El Nido Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By Sixty (60) Days. Bidders Should Have Completed, Within One (1) Year From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Negotiation Will Be Conducted Through Negotiated Procurement Procedures In Accordance With Section 53.1 Negotiated Procurement Two Failed Biddings As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184, Including Annex H Thereof. The Bac Will Engage In Negotiations With At Least Three (3) Suppliers To Ensure Effective Competition. The Selection Of The Successful Offer Shall Be Based On The Best And Final Offer That Will Be Submitted On The Specified Date Shown Below, And Which Would Meet The Minimum Technical Specifications Required. 4. Prospective Bidders May Obtain Further Information From Bac Secretariat And Inspect The Negotiation Documents At The Address Given Below From January 21 To February 06, 2025 During Monday To Friday, 8:00 Am To 5:00 Pm. 5. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before 9:00 Am, February 10, 2025. Late Bids Shall Not Be Accepted. Interested Bidders Shall Submit The Documents Based On The Checklist Below In Sealed Envelopes, Labeled As “negotiated Documents”, With The Title Of The Procurement Project, Name Of The Bidder, Address Of The Bidder, And Contact Details Of The Bidder, Addressed To The Undersigned. Each Bidder Shall Submit One (1) Original And Two (2) Readable Copies Of The First (technical) And Second (financial) Components Of Its Bid. Documents To Be Submitted Shall Be Properly Ring Bound, Tabbed, And Labeled. Checklist Of Technical And Financial Documents Instructions: Documents Must Be Printed In Legal Size (8.5” X 13”) Paper And Arranged According To This Checklist. Technical And Financial Documents Should Be Ring-bound And Properly Labeled Or Tabbed According To The Document Name For Ease Of Identification. Bidders Shall Submit Their Bids Through Their Duly Authorized Representative Using The Forms Specified In The Bidding Documents In Two (2) Separate Sealed Bid Envelopes, And Which Shall Be Submitted Simultaneously. The First Shall Contain The Technical Component Of The Bid, And The Second Shall Contain The Financial Component Of The Bid. I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ 1. Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents ⬜ 2. Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ 3. Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ 4. Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And ⬜ 5. Conformity With The Technical Specifications With Identification Of Brands Offered, Including The Following: 5.1 Conformity With Production/delivery Schedule 5.2 Conformity With Manpower Requirements 5.3 Organizational Chart 5.4 After-sales/parts (warranty Certification) ⬜ 6. Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, 6.1 Original Notarized Secretary’s Certificate (specific For This Project) In Case Of A Corporation, Partnership, Or Cooperative; Or 6.2 Original Special Power Of Attorney (specific For This Project) Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder; Or 6.3 Original Special Power Of Attorney (specific For This Project) Of The Owner For Sole Proprietorship Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ 11. The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents ⬜ 12. If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope Note: For Consolidated Procurement, The Price Per Unit Of The Goods Shall Be Quoted Not Exceeding The Abc And/or Cost Per Unit As Stated/published In The Invitation To Bid. ⬜ 13. Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ 14. Original Of Duly Signed And Accomplished Price Schedule(s). Other Documentary Requirements Under Ra No. 9184 (as Applicable) ⬜ 15. [for Foreign Bidders Claiming By Reason Of Their Country’s Extension Of Reciprocal Rights To Filipinos] Certification From The Relevant Government Office Of Their Country Stating That Filipinos Are Allowed To Participate In Government Procurement Activities For The Same Item Or Product. ⬜ 16. Certification From The Dti If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity. 6. The Schedule Of Negotiation Activities Is Stated Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. Activities Schedule Venue Issuance And Availability Of Negotiation Documents January 21 To February 06, 2025 Bac Secretariat Office Conduct Of Negotiation February 07 At 9:30 Pm To 5:00 Pm Bac Secretariat Office Deadline For The Submission Of Quotation/proposal February 10, 2025 At 9:00 Am 3rd Floor, Mayor’s Conference Room, New Municipal Hall, Opening Of Quotation/proposal February 10, 2024 At 9:30 Pm To 5:00 Pm 3rd Floor, Mayor’s Conference Room, New Municipal Hall, 7. Bidders Shall Provide Correct And Accurate Information Required In The Attached Forms. Price Quotation/s Must Be Valid For A Period Of One Hundred Twenty (120) Calendar Days From The Date Of Submission Of Quotation. 8. The Municipal Government Of El Nido Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 9. For Further Information, Please Refer To: Office Of The Bids And Awards Committee 2nd Floor, Old Municipal Building Bgy. Maligaya, El Nido, Palawan Contact No.: 0920-954-8810 Email Address: Bacsecretariat@mgoelnido.onmicrosoft.com Issued This 21st Day Of January 2025. (signed) Engr. Raul B. Maximo Bac Chairperson
Closing Date11 Feb 2025
Tender AmountPHP 1.5 Million (USD 25.5 K)
Roads & Highways Department rhd Tender
Works
Manpower Supply
Bangladesh
Description: Manpower Supply For Operation & Security Purpose At Kalurghat Ferryghat Both Side For Ferry, Pooltune, Gangway And Other Structure From 1st January 2024 To 15th January 2024 Under Chattogram Road Division During The Year 2024-2025.
Closing Soon6 Feb 2025
Tender AmountRefer Documents
Municipality Of Rizal,palawan Tender
Healthcare and Medicine
Philippines
Details: Description Acquisition Of 1 Unit Mobile Clinic Vehicle With Diagnostic Equipment Package And Accessories • Mobile Aluminum Van With An Interior Length Of 16ft. • Insulated Walls And Additional Reinforcement For Industrial Purposes. • All Walls Are Finished With A Composite Panel For The Interior • Sliding Glass Door (inside) And Swing Door (outside) At The Main Entrance • Installation Of 2 Sliding Windows • Provide An Entrance Stair For The Main Entrance • Painting Of The Alluminum Body • Installation Of Sticker Signage (layout Provide By The Client) • Installation Of Electrical Wiring And Lights. • Provide A Fifty-meter #10 Royal Cord As A Connecting Cable Wire •installation Of 1 Split-type And 1 Window-type Air Conditioner. • Installation Of Flooring (marine Plywood And Vinyl Finishing) • Provide An X-ray Room Area With A Small Lead Glass For Viewing (attached To The Sliding Door) • Installation Of An X-ray Unit • Provide A Mini Laboratory Workstation • Provide A Doctor's Consultation/check-up Room With A Patient's Bed And Floor Cabinets • Provide A Water Tank, Sink, Portable Vacuum Toilet With A Waste Tank, And An Exhaust Fan • Installation Of A Canopy • Installation Of A Generator Set •installation Of The Base For A 2-way Radio In The Driver's Dashboard • Comes With Four Pieces Of Park Jack • Provide A Special Key For All Compartments • Wind Breaker Laboratory Equipment * 1 Unit Centrifuge 8 Placer Tabletop Centrifuge Speed 200-6,000rpm, Display Digital Display For Time And Speed Value (or R,c,f, Value) Timer 0-30min Digital Timer Motor Brushless Dc Max. R.c.f. 4,265xg Capacity 8x(10-15)ml. Standard Accessory 8x(10-15)ml. Tube Adapter Optional Accessory (5-7)ml. Or (1.5-2.0)ml Tube Adapter, Weight (kg) N,w. 4,8/g.w.5.8 Overall Dimension W280xd280xh265mm Power Supply Ac 100-240v 50/60hz * 1 Unit Semiauto Chemistry Analyzer Test Mode: Kinetic, Endpoint, Two Point, Absorbance, Wavelength: 7 Standard Filters, 340,405,492,510,546,578,630nm, 1 Free Position, Wavelength Precision: ±2nm,width≤10nm, Absorbance Range: 0-4,500 Abs, Absorbance Precision: Outside 0.0001 Abs, Inside 0.00001 Abs Carryover & Repeatability Cv; <1%, Incubator: 37ᶞc,30ᶞc,25ᶞc And Others, Precision: ±0.1ᶞc, Sample Volume: 0-3000ul(500ul Recommend), Data Storage: 1000, Quality Control Curve: X Sd Cv% L-j Quality Control Curve For Each Test Item, Flow Cell: 32 Ul Quartz Glass 10mm, Lamp: Philips 6v 10w Halogen Lamp With The Longer Lifetime, Screen: 7-inch Color Lcd, Cpu: Arm Series High-speed Cpu, Printer; Internal Thermal Sensitive Printer, Interface; Rs-232 Work Environment; Temperature 0ᶞc-40ᶞc, Humidity:80%, Power Supply; 100240vac, 5060hz, 100va Dimension: L340mm*w270mm*h160mm, Net Weight; 5kc & 10.5kg •initial 1 Set Of Reagents (cholesterol, Hdlc &triclycerides-r-1:60mlx2, R-2: 20ml.x2 320 Test, Alt, Ast, & Glu Cod-pap-r-1:60mlx2, R-2: 15ml.x2 300 Test, Creatinine-s-r-1:60mlx2, R-2: 20ml.x2 320 Test, And Urea, Uric Acid-r-1:60mlx2, R-2: 15ml.x2 300 Test * 1 Unit 3 Parts Hematology Analyzer Priinciple Impedance Method For Wbc, Rbc, And Plt Counting, Cyanide-free Reagent For A Hemoglobin Test 21 Parameters Wbc, Lymph#, Mid#, Gran#, Lymph%, Mid%, Gran%,rbc,hgb,hct,mcv,mch,mchc,rdw-cv,rdw-sd, Plt,mpv,pdw,pct,p-lcr,p-lcc 3 Histograms Wbc,rbc, And Plt Reagent M-30d Diluent, M-20cfl Lyse, Probe Cleanser Sample Volume Prediluted Mode (20ul)whole Blood Mode (9ul) Throughput 70 Samples Per Hour Display 10.4-inch Tft Touch Screen Data Storage Capacity: Up To 500,000 Results Including Numeric And Graphical Information. Communication Lan Port Supports Hl& Protocol Support Bi-directional Lis Interface; 4 Usb Ports (for External Printer, Software Upgrade, Barcode Reader, External Wifi, Keyboard And Mouse) Lan Port (t) Printout Thermal Recorder, 50 Mm Wide Paper, Various Printouts Formats, External Printer Optional Operating Environment Temperature 0ᶞc-40ᶞc, Humidity:10%-90% Air Presure: 70k Pa-106kpa, Power Requirement 100v-24ov, ≤3000va, 50hz/60 Hz Dimension: Depth (410mm) X Width (300mm) X Height (400mm) Weight ≤20kg •initial 1 Set Of Reagents Lyse-0.31ml/cycle 1500, Diluent 20ml/cycle 950, Cleanser 1 Bot. 25 * 1 Unit Microscope Observation Method Brightfield, Darkfield Illuminator Transmitted Illuminator, Led Lamp Focus Focusing Mechanism: Stage Focus, Coarse Handle Stroke: 15mm, Coarse Adjustment Limit Stopper, Torque Adjustment For Coarse Adjustment Knob Field Diaphragm Binocular (option: Cx23-fs), Trinocular Revolving Nosepiece Manual, Standard (4 Positions) Stage Manual Stages With Right-hand Control, Built-in X; 76mm, Y;30mm Condenser Manual Abbe Condenser Na 1.25/w.d.-(4x-100x) (built - In) Observation Tubes Binocular, Standard (fn20), Trinocular, Tube Inclination Angel:30®, Trinocular Tube Light Path Selection (camera Observation): 0%:100%, 100%:0%, Interpupillary Distance Adjustment; 48-75mm Dimension (w X D X H) Binocular: 198 (w) X 398 (d) X 386 (h)mm, Trinocular: 198 (w) X 398 (d) X 430 (h)mm Weight Approx. 5.9kg. * 1 Unit Mini Refrigerator Full Range Digital Temperature Control From 5-20®c/frame And Handle, Triple-layered Tinted Glass Door With Stainless Steel Frame And Handle, 2 Durable And Attractive Wooden Shelves, Easy-to-use Touch Control With Led Temperature Display, Cool White Led Interior Lighting, Quiet And Low-vibration Compressor, Class A Rating Low Energy Consumption, Regulated Humidity, 4 Adjustable Feet * Pipetters • 1 Unit Pipette 1;10-100ul Adjustable Volum Pipette • 1 Unit Pipette 2;100-1000ul Single Channel Pipette * Basic Laboratory And Medical Supplies 1 Unit Digital X-ray With Panel Set • Using High Frequency Inverter Technology To Produce, Stable High Voltage Output Can Obtain Good Image Quality; • With Compact Design, It Is To Carry And Work In Different Areas And Locations; • There Are Three Exposure Cotrol Methods; Remote Control, Hand Switch And Interface Button Type; • Fault Self-diagnosis And Self Protection; • With A Flexible Digital Interface,users Can Go Deep Into The Core Programming Control And Can Be Adapted To Different Dr Detec Tors Parameters; • 5kw Portable X-ray Machine • Maximum Power; 5kw • Photography Kv Range; 40-50kv, 40-60kv, 40-80kv, 40-100kv, 40-110kv • Photography Ma Range; 100ma, 80ma, 63ma, 50ma, 32ma • Mas Range; 0.32-300 Mas • Exposure Time Range; 0.01-6.3s • Operating Frequency;>30 Khz • Input Power Type; 220v ± 10%, 50hz/60hz • Input Power Type; 37(l) X 26 (w) X23 (h) Cm220v ± 10%, 50hz/60hz • Weight; 21kg • X-ray Image Stand And Tube Pillar; Radio-graphic Device Movement Along Pillar1400 Mm ±5%; Focus Distance; 130 Cm ± 5%; Fixed Grid Optional; Grid Density 103l/inch, Grid 10;1; Sid 180cm; Size; 15"x18" * 1 Unit Truck Mounted Digital X-ray Machine Sensor; Scintillator; Direct Deposit Csl (cesium Lodide), Active Area; 434 X 430 Mm2, Image Matrix; 3072 X 3072 Pixels, Pixel Pitch; 140 Um Mechanical Dimension; 460 X 460 X 15 Mm3, Weight; 3.96 Kg, Housing Material; Carbon Fiber Imaging Plate, High Strength Aluminum Alloy Body Communication Communication Interface ; Gigabit Ethernet, Acquisition Timer; 2-4s, Exposure Control; F²aed® (full-field Aed), Manual Sync, External Sync Image Quality Spatial Resolution; 3.57 Ip/mm, Mtf; ≤63% (@1 Lp/mm), ≤35% (@2lp/mm), ≤17% (@3 Lp/mm), Dqe (rqa5, 30 Ugy)≤62% (@ 0 Lp/mm), ≤17% (@ 3 Lp/mm), Dynamic Range; > 80 Db Environmental Operating; Natural Cooling Temperature Range; 5-35 ͦc, Humidity Range (non-condensing); 30%-75% Rh, Storage-temperature Range 20-55 ͦc-humidity Range; 10% - 90% Rh Power Power Supply; 100-240 Volts Ac, Frequency; 50/60 Hz, Power Dissipation; 22w (operating), 8w (standby Mode) * 1 Unit Wired Panel 1800 Le * 1 Unit Laptop * 1 Unit Printer Ultrasound * 1 Unit Portable Ultrasound • 12-inch Rotatable Led Monitor (0-30 Deg) Adapt To Different Viewing Angles • Ultra-light And Compact Design, Ideal For Mobile Services • Applications; Urology, Vascular, Small Parts, Pediatrics, Cardiology • Display Modes; B, B/b, 4b, M, B/m • Gray Scale 256 Levels • Multiple Beam Forming Technology (enhance Frame Rate, Improve Image Resolution) • 240mm Max Scanning Depth (depending On The Probe Type) • 2.5mhz - 11 Mhz Probe Frequency (depending On The Probe Type) • Archives Management - Patient Information Management, Patient Images Record, Patient Exam Report • Power Supply - Ac 240v-100v, 50hz-60hz • A Broad Range Of Transducers Available • Software Packages, General Measurement, Ob, Obstetrics, Gyn, Urology, Abdomen, Cardiac B/m Mode, Vascular, Small Parts, Orthopedic, Pediatrics • Standard Configuration Main Unit, 3x Usb Ports, 1 X Probe Connector, C3-a Convex Probe Included, Vga Port, Video Port & Lan Port Ecg Machine * 1 Unit Portable Ecg Machine • 3 Packs Initial Tracing Paper • 3 Channel Ecg Machine With Interpretation, 5.0" Color Tft Lcd Display, Simultaneous 12 Leads Acquisition And 1, 1+1, 3 Channel (manual/auto) Recording With High Resolution Thermal Printer, Manual/auto Working Modes, Use Digital Isolation Technology And Digital Signal Processing, Baseline Stabilization Inspection, Full Alphanumeric Silicon Keyboard,support U Disk And Sd Card Storage, Support Wifi Connection Workstation, Dimension; 65cm X 35cm X 25cm Communication * 2 Units 2-way Radio • Portable Radio And Base Radio (to Be Installed In The Truck) 136-174mhz; 400-490mhz, Output Power; 60w (vhf), 40w (uhf), 200 Programmable Channels, Ctcss/dcs Scan, Scramble Function, Compander To Reduce Noise, Ani Function (dtmf)/ani, 5-tone/ani) Ptt Id, Qhm-03 Multifunctional Microphone With Dtmf • Receiver (etsi En 300 096 Standard Testing And Transmitted (etsi En 300 066 Standard Testing 1 Unit Generator Set (15 Kva) * Generator •brush, Self-excitation, 2 Poles Single-phase, Automatic Voltage Regulator (avr), 60hz, 15kva Max Ac Output, 10kva Rated Ac Output, 220v Rated Ac Voltage, 100%=1.0 Power Factor * Engine Forced Air-cooled, 4 Stroke, Direct Injection, Displacement; 496cc, Max Output; 18hp, Fuel; Diesel Light Fuel (bs- Al Or Equivalent), Fuel Tank Capacity; 1gl, Continuous Operating Hours; 5 Bh, Oil Capacity; 1.65l, Ignition System; Direct-injection, Standing System; Electric, Operating Noise Level (7m); 72db * Dimensions Dimension Lxwxh; 91cm X 52cm X 65cm * Package Dimensions Overall Dimension Lxwxh; 95cm X 56cm X 72cm, Net/cross Weight; 155kg/165kg 1 Unit Other Equipment And Supplies * Split-type Aircon, 1.5 Hp, Non-inverter, * Window Type Aircon, 1.5hp, Non-inverter, * Compact Silent Generator (10kva Gen Set) * Fire Extinguisher Classes Of Fire; Abc, Chimical Efficacy; 12 Years, Warranty; 5 Years, Non-conductor Of Electricity; Yes Non-corrosiver; No, Non-residual; No, Multi-shot; No * 1 Unit Wheelchair • Foldable Lightweight Alluminum Frame, Fixed Armrest & Flip-up Footrest, Foldable Backrest For Easy Storage, Comes With United Handbrakers, Solid Front Castor; 15cm, Solid Back Castor; 30cm, Nylon Seat, Weight; 8kg, Max Load; 100kg * 1 Unit Stretcher • Unfolded Size (lx W X H); 190x64x45cm, Folded Size (lx W X H); 92x19x11cm, Military Style With Bag, Durable Aluminum Constructed Frame With Steel Legs And Reinforced Water-resistance Polyester Fabric, Perfect For Outings, Traveling, Camping, Daycare, Or Lounging, Dimensions Of 75" L, By 25" W And 18" Off The Ground; Holds Up To 250 Poundsa, Carrying Bag Included; Folds Up To 36"l X 7"w X 4"h And Weight 121lbs, Hassle-free Set Up * 1 Unit First Aid Kit Adhesive Bandages In Various Sizes (also Known As Plasters Or Band-aids), Sterile Gauze Pads Or Rolls, Adhesive Tape, Antiseptic Wipe Or Solution, Alcohol Wipes Or Solution, Disposable Gloves, Tweezers, Scissors, Intant Cold Compress, Face Mask, Oral Thermometer, Pain Relievers (such As Acetaminophen Or Ibuprofen), Antihistamine Tablets Or Cream (for Allergic Reactions), Hydrocortisone Cream (for Skin Irritations And Rashes), Burn Ointment * 3 Unit Table * 12 Units Chairs * 1 Unit Canopy 1 Unit Genxpert Machine And Accessories And Cartridges Cepheid Gxiv-4 Tsk With Cartridges 1 Unit Dental Chair With Dental Kits And Accessories (lights And Forceps) Rapid Diagnostic Test * 10 Bxs. Trimera Drug Of Abuse (doa) Rapid Test Range (25's) * 10 Bxs. Trimera Hcg Pregnancy Test (urine And Serum)(25's) * 10 Bxs. Trimerah. Pylori Rapid Test(25's) * 10 Bxs. Trimera Fecal Occult Blood (fob) Rapid Test (25's) * 10 Bxs. Trimera Typhoid. Rapid Test (25's) * 10 Bxs. Trimera Dengue Nsi And Lgg/lgm Combo Rapid Test (25's) * 10 Bxs. Trimera Malaria Rapid Test (25's) * 10 Bxs. Trimera Leptospira Lgg And Lgm Rapid Test (25's) * 10 Bxs. Trimera Syphilis Rapid Test (25's) * 10 Bxs. Trimera Hepotitis B Virus (hbv) Rapid Test Range (25's) * 10 Bxs. Trimera Hepotitis B Surfoce Antigen (hbsag)) Rapid Test (25's) * 10 Bxs. Trimera Hepotitis C Virus (hcv) Rapid Test (25's) * 10 Bxs. Trimera Human Immunodeficiency Virus (hiv) Rapid Test Range (25's) * 10 Bxs. Trimera Cordioc Marker Rapid Test Range (25's) With Technical Assistance Of Company Manpower For 1 Month To Dry Run The Equipments And Train The Mho Personnel With Lgu Rizal Decals, Lto Registered Under Rizal Lgu And Gsis Insurance
Closing Date11 Feb 2025
Tender AmountPHP 13.5 Million (USD 231.3 K)
Roads & Highways Department rhd Tender
Works
Manpower Supply
Bangladesh
Description: Manpower Supply For Operation & Security Purpose At Kalurghat Ferryghat Both Side For Ferry, Pooltune, Gangway And Other Structure From 16th January 2024 To 31st January 2024 Under Chattogram Road Division During The Year 2024-2025.
Closing Soon6 Feb 2025
Tender AmountRefer Documents
1531-1540 of 2226 active Tenders