Led Tenders

Led Tenders

Caraga Regional Hospital Tender

Healthcare and Medicine
Corrigendum : Tender Amount Updated
Philippines
Closing Date8 Jan 2025
Tender AmountPHP 5.2 Million (USD 91.2 K)
Details: Description Republic Of The Philippines Department Of Health Caraga Regional Hospital Surigao City Ooooooooo @@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@ Bids And Awards Committee Invitation To Bid Ib No. 2024-01-08 (117) Supply And Delivery Of Various Hemodialysis Supplies Under Single-year Framework Agreement ( Early Procurement Activity ) Approved Budget For The Contract: Php 5,298,140.00 ========================================================= 1. The Caraga Regional Hospital (crh), Through The Fy2025 Raf / Gaa Intends To Apply The Sum Of Being The Approved Budget For The Contract (abc) Of Five Million Two Hundred Ninety Eight Thousand One Hundred Forty Pesos Only ( Php 5,298,140.00 ) As To Payment Under The Contract For Supply And Delivery Of Various Hemodialysis Supplies Under Single-year Framework Agreement (early Procurement Activity). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening And Items Below Are Subject For A Competitive Bidding As Framework Agreement List. This Is A Lot Bid. Item No Description Qty Unit Of Measure Unit Cost Total Cost Lot 1 Hd Sterilant 1.1 50% Citric Acid Solution 5l, Buffer 3000 Gal 1,532.00 ₱4,596,000.00 Classification: Organic Acid Hazardous Substance: Citric Acid %(w/w) 50-52 Physical Data Appearance: Clear To Hazy Yellow Odor: Charactieristic Ph: 1.00-1.30 1,2 Peracitic Acid Sterilant 24 Gal 6,240.00 ₱149,760.00 1. Appearance: Colorless Or Pale Yellow Clear Aqueous Solution 2. Active Ingredients: Peracetic Acid: 4% Hydrogen Peroxide: 20% Acetic Acid: 10% 3. Odor: Acetic Acid Odor 4. Water-solubility: Dissolves Regardless The Ratio 5. Storage Stability: 18 Months At Normal Temperature Total ₱4,745,760.00 Lot 2 Hd Supplies 2.1 Gauze 4x4 70 Box 180.00 ₱12,600.00 4”x 4” 8 Ply 24 X 28 Mesh 100 Pads/pack 2.2 Syringe 10cc With Needle G21 70 Box 210.00 ₱12,250.00 Smooth And Double Plunger X 100/box 2.3 Syringe Dispo 5cc W/ G12/g23 70 Box 270.00 ₱18,900.00 Needle, Sharpest Needle, Polyprolene Barrel, Non-toxic Double Plunger, Smooth Movement Of Plunger, Thermoplastic Elastometer Gasket, Clear Prints On The Syringe, Luerlock, Undergone High Internsity Sterilization 100/box 2.4 Hardness Test Strips 100’s /bottle 10 Bottle 2,280.00 ₱ 22,800.00 Total ₱72,780.00 Lot 3 Hemodialysis Chemical Analysis Test 3.1 Chemical Water Analysis 4 Test 13,200.00 ₱52,800.00 (every 6 Months Of Test) 3.2 Chlorine Test Strips, 100s/bottle 10 Bottle 2,280.00 ₱22,800.00 Total Chlorine Range: 0 - 25- 50 - 200 - 500 - 800 - 1500 - 2000 Ppm 3.3 Peracetic Potency Strips 100 Strips/bottle 20 Bottle 3,000.00 ₱60,000.00 Concentrations Of Peracetic Acid At Or Below 400 Ppm Will “fail” And Concentrations At Or Above 800 Ppm Will “pass” With The Guardian Peracetic Acid Test Strips. 3.4 Peracetic Residual Strips 100 Strips/bottle 80 Bottle 1,800.00 ₱144,000.00 Concentrations Of Renalin In Dialyzer At Or Below 400 Ppm Will “fail” And Concentrations At Or Above 800 Ppm Will “pass” With The Guardian Peracetic Residual Test Strips. 3.5 Residual Peroxide Test Strips 100 Strips/bottle 80 Bottle 2,500.00 ₱200,000.00 A Semi-quantitative Procedure Provides The Hydrogen Peroxide Concentration Between 0 And 10 Ppm Comparing The Reacted Indicator Pad Color To The Color Chart On The Bottle Label. Color Blocks Represent Peroxide Concentrations Of 0, 1, 3, 5 And 10 Ppm. Total ₱479,600.00 Grand Total ₱5,298,140.00 Terms Of Reference Bidders Must Submit The Following During Post-qualification: 1 Samples If Offered Item Is Not Previously Procured Or If Required By The Procuring Entity 2 Brochures Indicating Specification 3 Terms Of Delivery: 15 Calendar Days Upon Receipt Of Call-off 4 Delivery Schedule: Upon Call Off 5 This Procurement Is Under Framework Agreement -single Year Framework Agreement 6 Terms Of Payment. Payment Shall Be Made Upon Complete Delivery Per Call – Off. Necessary Documents Are Required In Compliance With Auditing Rules And Regulations. 7 This Procurement Is Lot Bid – Single Lot And Awarded In One Contract. Bidder Shall Bid All The Items In A Lot. 8 Product Expiration Date Must Be At Least 6 Months To 1 Year From Date Of Delivery 9 Validity Of The Contract / Contract Termination 10 Without Prejudice To The Provision Of Applicable Laws, Rules And Guidelines, The Contract Shall Be Automatically Terminated Under The Following Conditions: 11 A. When The Total Quantity Specified In The Contract Has Been Exhausted Within A Single Year 12 B. For Any Justifiable Reason Ground Where The Contract Will Not Redound To The Benefit Of The Government Or There Is Violation Of The Contract. 13 Repeat Order: 14 1. No Repeat Order For An Item In Contract Being Awarded Shall Be Allowed Until After The Procuring Entity Has Exhausted The Estimated Quantity For The Same Item Specified Therein Or After The Contract Has Expired, Whichever Comes First, And Subject To The Conditions Provided In Section 51 Of Ra 9184 And Its Irr. For This Purpose, The Repeat Order Shall Be Availed Of Only Within Six (6) Months From The Date Of The Last Of Final Delivery Order Contract For A Specific Item Where The Estimated Quantity Has Been Exhausted, Or The Expiration Of The Contract. 15 2. In Case Repeat Order Is Allowed And Resorted To, The Twenty-five (25%) Maximum Allowable Quantity Shall Be Based On The Aggregate Quantity Of Actual Items Ordered And Delivered. 16 General Conditions 17 All Other Rules Governing Contract Implementation And Termination Under Ra 9184 And Its Irr, And Relevant Procurement Policies Shall Be Applicable. Technical Specification And Terms Of Reference Are Hereby Posted In Philgeps And Form An Integral Part Of This Invitation To Bid. 2. The Crh Now Invites Bids For The Procurement Of The Above-captioned Project. Delivery Of The Goods Is Required Within The Period Specified Under Section Vi (schedule Of Requirements). Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. Section 23.4.1.3.(ra 9184). The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty Five Percent ( 25% ) Of The Abc. Slcc Must Be Within 2 Years From The Submission Of Bids. (based On The Completion Date). The Single Largest Completed Contract (slcc) Must Pertain To Hemodialysis Supplies Or Medical Supplies Or A Similar In Nature, As Determined And Defined By The Bids And Awards Committee ( Bac ). For Procurement Where The Procuring Entity Has Determined, After The Conduct Of Market Research, That Imposition Of Either (a) Or (b) Will Likely Result To Failure Of Bidding Or Monopoly That Will Defeat The Purpose Of Public Bidding: The Bidder Should Comply With The Following Requirements: A. Completed At Least Two (2) Similar Contracts, The Aggregate Amount Of Which Should Be Equivalent To At Least Fifty Percent (50%) In The Case Of Non-expendable Supplies And Services Or Twenty-five Percent (25%) In The Case Of Expendable Supplies] Of The Abc For This Project; And B. The Largest Of These Similar Contracts Must Be Equivalent To At Least Half Of The Percentage Of The Abc As Required Above. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Nondiscretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee (bac) Secretariat, Caraga Regional Hospital, Surigao City And Inspect The Bidding Documents At The Address Given Above During 8:00 Am – 5:00 Pm, Monday To Friday. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 5, 2024 To January 08. 2025 On Or Before 10:00 A.m. From The Address Above And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Specified Below: Bidding Schedule Pre-bidding Conference December 16, 2024 At 9:00 A.m. Via Zoom Platform Link: Join Zoom Meeting Https://us06web.zoom.us/j/81682739663?pwd=qqb1jfgbvatdpssxch8hafbtcco9la.1 Meeting Id: 816 8273 9663 Passcode: 096095 Deadline Of Submission Of Bids January 08, 2025 At 10:00 A.m... Via Online And Submit Your Bidding Documents To This Email Address: Crhbac2020@gmail.com. Please Be Advised That Failure To Submit Bidding Documents To The Designated Official Email Address Will Result In Automatic Rejection And Disqualification. Opening Of Bids January 08, 2025 At 3:30 P.m. Via Zoom Platform Join Zoom Meeting Https://us06web.zoom.us/j/81337163910?pwd=ebqw909boftdzawx99jcu3wwqolsvo.1 Meeting Id: 813 3716 3910 Passcode: 242132 Complete Philippine Bidding Documents Please Click The Link Below: Https://drive.google.com/drive/folders/1gabl1vzoiuixzohvqrmu8ftjpo6f1hc1?usp=sharing Amount Of Bidding Documents: Lot 1: Php 5,000.00 Lot 2: Php 500.00 Lot 3: Php 500.00 The Above Payment Of Bidding Documents Is Only Applicable To Those Bidders That May Opt To Participate In Only 1 Or 2 Lots Out Of The 3 Lots. Bidders Who May Participate In All Of The Lots Shall Pay The Amount Of Php 10,000.00 Payment Of The Bidding Documents Is Non-refundable . It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. The Following Phlippine Bidding Documents Can Be Accessed In The Philgeps And All Form And Part Of This Invitation To Bid, To Wit: A. Technical Specification / Terms Of Reference/ List Of Items B. Instruction To Bidders: B.1. Documents To Be Submitted (checklist- This Will Be Discussed During The Pre-bid Conference) B.2. Memorandum Of Undertaking – Provision Thereof Is Strictly Implemented C. Guidelines On The Conduct Of The Electronic Submission And Receipt Of Bids By The Procuring Entity – Caraga Regional Hospital (crh) D. Philippine Bidding Documents E. Framework Agreement Guidelines F. Framework Agreement Lists F. Other Documents Essential Documents Required By This Procuring Entity And Ra 9184 6. The Crh Will Hold A Pre-bid Conference On The Above-mentioned Date, Time And Venue, Which Shall Be Opened To Prospective Bidders. The Pre-bidding Conference And Opening Of Bids Shall Be Conducted Through Videoconferencing, Webinar Or Virtual. Please Send Your Intent To Participate To Our Email Address As Provided Below. 7. Bids Must Be Duly Received By The Bac Secretariat At Via Designated Email On Or Before January 08, 2025 At 10:00 O’clock In The Morning. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bid Opening Shall Be On January 08, 2025 At 3:30 O’clock In The Afternoon At The Bac Conference Room, Beside Procurement Office, Caraga Regional Hospital, Rizal Street, Surigao City As Virtual / Electronic Bidding Via Zoom Platform. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Above. Late Bids Shall Not Be Accepted Under Any Circumstances May It Cause. 8. Furthermore, The Standard Philippine Bidding Document (pbd) Is Form And Part Of This Invitation In Accordance To Ra 9184 And Other Applicable Laws, Rules And Policy. 9. The Crh Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. The Opening And Receipt Of Bids Is Strictly Implemented Through Electronic Submission. Given The Covid-19 Pandemic, Procurement Activity Has Been Expedient And One Of This Is The Conduct Of Electronic Submission Of Bids. The Crh Thru The Bids And Awards Committee (bac) Has Submitted Certification, Certified By The Highest Official Managing The Information Technology, Describing The Electronic System Or Procedure To Be Used By The Crh For The Electronic Submission And Receipts Of Bids And A Statement That The Same Is Compliant With The Gppb Resolution No. 12-2020 Requirements. 11. Bidding Documents Shall Be Emailed To This Email Address, With Activated Password To: Crhbac2020@gmail.com. You May Deposit On Line For The Payment Of The Bidding Documents To This Account Below: Bank Name: Land Bank Of The Philippines Account Name: Caraga Regional Hospital-trust Fund Account Number: 0982 -1288 – 70 12. Furthermore Deposit Slip Shall Be Submitted Via Email To: Crhprocurement.bac@gmail.com 13. The Procuring Entity Will No Longer Accept Nor Entertain Any Form Of Bids Submission Except Electronic. Failure To Comply Electronic Submission Will Be Immediately Disqualified. Guideline On The Electronic Submission Is Hereby Attached. 14. Join The Caraga Regional Hospital Supplier Network By Filling Out The Registry Form From This Link : Https://bit.ly/crh_suppliersregistry 15. For Further Information, Please Inquire To: Bac Secretariat Caraga Regional Hospital. Rizal Street, Surigao City Tel. Nos. (086) 826-1575 Local 194 Direct Line: (086) 826-9058 Mobile Nos. 09850508783 (smart/tnt) 09539212832 (globe/tm) E-mail Address: Crhprocurement.bac@gmail.com Approved By: (sgd) Atty. Ma. Flordelin T. Ensomo, Cpa Attorney Iv Chairman, Bids And Awards Committee

DEFENSE LOGISTICS AGENCY USA Tender

Healthcare and Medicine...+1Chemical Products
United States
Closing Date9 Jan 2025
Tender AmountRefer Documents 
Details: The Defense Health Agency (dha) Medical Logistics (medlog) Directorate Medical Materiel Enterprise Standardization Office (mmeso) And The Defense Logistics Agency (dla) Troop Support Medical Prime Vendor (pv) Program Announce A Sources Sought Notification For The Creation Of A Qualified Suppliers Listing (qsl) For Chlorhexidine Gluconate (chg) Applicators, Procedural. This Is Not A Request For A Price Quote. these Chlorhexidine Gluconate (chg) Applicators, Procedural Products Are For Purchase By The Military Treatment Facilities (mtfs) Of The Military Health System (mhs) And For The Operational Assemblages Of The Army, Navy, Air Force, Marine Corps, And Naval Expeditionary Medical Support Command (nemscom) And Managed Regionally By Mmesos North, South, West, Pacific And Europe, Hereafter Referred To As Mmesos. For Information Regarding Dla Troop Support Medical’s Pv Program Please Access The Dmm Online Web Site At Https://www.medical.dla.mil. this Sources Sought Notification Is Intended To Solicit Information And Products For Evaluation In Order To Create A Qsl For Chlorhexidine Gluconate (chg) Applicators, Procedural In Accordance With (iaw) Far 9.2. The Qsl For Chlorhexidine Gluconate (chg) Applicators, Procedural Will Be Established Approximately 07 February 2025 And Is Anticipated To Be The Basis Of A Standardization Action. All Medical Consumable Items On This Qsl Must Be On A Distribution And Pricing Agreement (dapa) For The Dla Troop Support Medical/surgical Prime Vendor (mspv) Program. All Participating Vendors Must Complete The Registration In The Dapa Management System (dms) At Https://www.medical.dla.mil/portal/dapams/dapams.aspx And Include Either Their Dapa Number Or Their Defense Medical Materiel (dmm) Number As Part Of Their Qsl Package Worksheet Submission. Receiving A Dmm Number Allows Access To The Dms And Is The First Step To Becoming A Dapa Holder. Dapa Holders Must Be Prepared To Ship Items To The Pvs, So That The Pvs May Carry Inventory And Mtfs May Designate Items As Usage; Therefore, Standardized Items May Not Be Coded In The Dms As "drop Ship Only." note: It Is Recommended That New Participants Contact Each Pv Prior To Adding Items To Dapa, In Order To Gain A Full Understanding Of The Pv's Requirements And Any Potential Costs Associated With Pv Handling Of Those Items. if You Qualify As A Vendor On The Qsl, You Will Then Be Invited, Approximately 13 February 2025, To Submit Pricing Quotes And A Separate Screenshot Of Your Submitted Dapa Log Submission Or Existing Dapa Base Uncommitted Pricing For All Required Items To The Mmeso Pocs. Both Pricing Quotes And Substantiating Dms Documentation Will Be Required For Eligibility To Enter Into An Incentive Agreement (ia) For Chlorhexidine Gluconate (chg) Applicators, Procedural. Only Those Vendors With An Established Dapa Will Be Eligible To Enter Into The Subsequent Ia. The Government Reserves The Right To Standardize Or Not Standardize On Chlorhexidine Gluconate (chg) Applicators, Procedural. The Resulting Ia Will Not Be A Contract And Will Not Constitute A Guarantee Of A Specific Volume Of Sales Dollars. the Mspv Program Requires That All Items Be Manufactured In A Trade Agreements Act (taa) Compliant Country (see Dfars 252.225-7020 And 252.225-7021), Unless It Is Determined That No Functionally Equivalent Item Is Available From A Compliant Source. To Be Eligible For Inclusion In The Proposed Qsl, All Vendors Are Required To Provide Country Of Origin Information In The Qsl Package Worksheet. In Addition, According To The Dapa Terms And Conditions, Vendors Must Complete The Dapa Taa Certification For Each Item Quoted. If A Quoted Item Is A Taa Non-compliant End Product, The Government Can Use This Information To Determine Whether Or Not A Non-availability Determination Exists Or If The Government Will Make A Non-availability Determination For The Item. Unless A Non-availability Determination Is Made Or A Waiver Is Obtained, Taa Non-compliant Country End Products Cannot Be Added To The Qsl And/or Dapa. note: The Contracting Officer Will Review Submissions In Response To The Subsequent Ia For Chlorhexidine Gluconate (chg) Applicators, Procedural For Country Of Origin Purposes. Only Vendors On The Qsl Who Offer Items Which Are Us Made, Designated Country, Or Qualifying Country End Products Will Be Considered For An Ia, Unless The Contracting Officer Determines That No Functional Equivalent Item Is Available From A Compliant Source In Accordance With Dfars 225.403(c)(i). Vendors Are Advised To Keep This In Mind When Submitting Their Response To This Sources Sought Notification. a. Products & Performance Required the Mmesos Are Seeking Product Line Items In The Category Of Chlorhexidine Gluconate (chg) Applicators, Procedural. Within The Mhs Mtfs And Operational Procurement This Product Line Has An Estimated Annual Sales Volume Of $812,276. This Forecast Is A Good Faith Estimate Based On Historical Usage Data During A Recent 12-month Period And Does Not Constitute A Guarantee Of A Specific Volume Of Sales Dollars. Four Items Are Required For Addition To The Qsl And Account For 100% Of The Total Volume In Sales $812,276. The Specifications For This Project Are Shown In The “requirements To Qualify For Qsl” Section Below. b. Instructions To Vendors To Qualify For The Qsl vendors Interested In Qualifying For Inclusion In The Qsl Must Respond To This Qsl Sources Sought Notification By Sending The Appropriate Qsl Package Worksheet And All Supporting Documentation Via E-mail To The Lead Mmeso And Dla Pocs Below. The Qsl Requirements Are Outlined Under Requirements To Qualify For Qsl Outlined Below. vendor Must Complete The Qsl Package Worksheet In Full And Submit It To The Mmeso Pocs And Dla Poc As Listed In The Qsl Source Sought Notification By The Above Response Date. The Vendor’s Submission Must Include All Detailed Information Requested In The “requirements To Qualify For Qsl” Section Below And Must Also Include: (1) Company Name And Address; (2) Company Poc (name And Phone Number, Fax Number, And E-mail Address); (3) Commercial And Government Entity (cage) Code; (4) Identification Of The Sources Sought Notification To Which The Vendor Is Responding, And (5) Dapa Or Dmm Number. only One Manufacturer Part Number May Be Provided For Each Product Description Listed In Requirement 5 Per Submitted Response. vendors May Provide Multiple Responses/submissions To The Qsl Source Sought Notification. vendor Must Offer Commercially Available Products For All Items Offered In Response To This Sources Sought Notification. supporting Documentation Must Be In Form Of Commercially Available Catalogs And Product Literature (e.g. Brochures, User Manuals, Product Packaging, Product Specification Sheets, Product Images, Etc.). due To The Potential For E-mail To Be Lost In Transmission, From Network Security, Etc., Vendors Are Strongly Encouraged To Confirm With The Mmeso Pocs That Their E-mail Submission Has Arrived. Each Submitting Vendor Is Advised To Confirm Receipt Allowing Adequate Time For Resubmission Before The Due Date And Time. any Vendor Experiencing Difficulty Opening The Worksheet May Contact The Mmeso Pocs. The Mmeso Poc Will Provide A Worksheet Copy Via E-mail. vendors That Do Not Meet The Deadline Of Cob 5:00 Pm Local Philadelphia Time For This Qsl Sources Sought Notification Will Not Be Included In The Mmeso’s Review To Establish The Qsl And Thus Will Not Be Able To Participate In The Subsequent Standardization Action. requirements To Qualify For Qsl the Requirements For This Product Line Are Outlined Below. Complete Answers And All Supporting Documentation Must Be Provided With The Vendor’s Submittal By The Response Date Stated In This Qsl Sources Sought Notification. A Vendor Who Does Not Meet All Of These Requirements Or Who Does Not Submit Documentation To Support These Requirements As Requested Will Not Be Qualified For The Qsl. Vendors Must Provide Responses To This Sources Sought Notification Via The Qsl Package Worksheet. technical Review supplier Requirements: vendor Must Have A Dapa Or Be In The Process Of Applying For A Dapa Number For The Product Line Listed. Vendor Must Provide Their Dapa Number Or Provide Date Of Application And Dmm Number Proving Access To The Dms, As The Subsequent Standardization Action Requires Vendors To Have All Required Items On Dapa. vendor Must Have An Agreement With The Current Dod Medical/surgical Prime Vendor Cardinal Health, Or Must Work With Cardinal Health To Initiate An Agreement, As Standardized Items From This Qsl Will Be Distributed Via The Mspv Program. vendor Must Have An Agreement With The Current Dod Medical/surgical Prime Vendor Owens & Minor, Or Must Work With Owens & Minor To Initiate An Agreement, As Standardized Items From This Qsl Will Be Distributed Via The Mspv Program. vendors Must Validate That Their Account Is Active In The System For Award Management (sam) And Provide Cage Code. Vendors In The Process Of Obtaining A Cage Code Must Provide Documentation To Support That They Have Registered In Sam. Vendors Without A Cage Code And/or A Sam Account Will Not Be Considered For Participation In The Subsequent Standardization Action. See Https://www.sam.gov/sam/. required Products: 5. Vendor Must Provide Manufacturer Part Numbers That Meet The Product Descriptions Below. Vendor Must Submit The Following Information Via Qsl Response Worksheet For Each Offered Product: Vendor Part Number, Manufacturer Part Number, Manufacturer Name, Full Item Description, Unit Of Measure (uom), Quantity (qty) In Uom, Unit Of Inner Packaging (uop), Qty Of Uom In Uop, Unit Of Sale (uos), And Qty Of Uom In Uos. Vendor Must Provide Product Catalog And Literature For Any Items Offered In Response To This Sources Sought Notification. Only One Vendor Part Number Should Be Provided For Each Item/sample. Vendor Must Send The Same Part Number(s) For Evaluation(s) As Provided In Response To This Qsl Announcement And As Noted In The Qsl Package Worksheet. The Vendor Must Provide Country Of Origin For All Required Items And Any Optional Items Offered. required Product(s) & Annual Usage In Units 5.1 Chlorhexidine Gluconate (2% Chg) Isopropyl Alcohol (70% Ipa) Applicators, Procedural, 1 Ml, Clear, Sterile / 161,460 5.2 Chlorhexidine Gluconate (2% Chg) Isopropyl Alcohol (70% Ipa) Applicators, Procedural, 1.5 Ml, Clear, Sterile / 198,080 5.3 Chlorhexidine Gluconate (2% Chg) Isopropyl Alcohol (70% Ipa) Applicators, Procedural, 3 Ml, Clear, Sterile / 327,975 5.4 Chlorhexidine Gluconate (2% Chg) Isopropyl Alcohol (70% Ipa) Applicators, Procedural, 3 Ml, Hi-lite Orange, Sterile /118,175 6. Vendor Must Provide Chlorhexidine Gluconate (chg) Applicator, Procedural Products That Are Not Made With Natural Rubber Latex. Vendor Must Also Provide Submittal Documentation Establishing That The Offered Products Are Not Made With Natural Rubber Latex. The Vendor Must Meet This Requirement In One Of Three Ways: 1) Demonstrating That The Labeling Or Product Information For The Offered Products Contains The Fda Recommended Statement "not Made With Natural Rubber Latex," 2) Demonstrating That The Iso Bs En 15223-1:2021 Symbol [reference Number 5.4.5 With Annex B.2 Negation Symbol] Is On The Labeling Or Product Information For The Offered Products, Or 3) If The Labeling Or Product Information Do Not Contain The Fda Recommended Statement Or The Iso Bs En 15223-1:2021 Symbol [reference Number 5.4.5 With Annex B.2 Negation Symbol], The Vendor Must Provide A Signed Letter Stating That The Offered Products Are "not Made With Natural Rubber Latex." 7. Vendor Must Provide Chlorhexidine Gluconate (chg) Applicator, Procedural Products That Meet Fda General Controls And Special Controls As Applicable And Submit Supporting Documentation With Initial Submittal To Include Fda Establishment Registration, Medical Device Listing, And 510(k) As Applicable. 8. Vendor Must Provide Chlorhexidine Gluconate (chg) Applicator, Procedural Products That Have An Approved New Drug Application (nda) By The Fda And Submit Supporting Documentation With Initial Submittal. 9. Vendor Must Provide Chlorhexidine Gluconate (chg) Applicator, Procedural Products Where Both Applicator And Solution Are Sterile And Provide Documentation To Support With Initial Submittal. 10. Vendor Must Provide Chlorhexidine Gluconate (chg) Applicator, Procedural Products With No Additional Active Ingredients, Other Than 2% Chlorhexidine Gluconate (chg) And 70% Isopropyl Alcohol (ipa) And Provide Documentation To Support This With Initial Submittal. 11. Vendor Must Provide Chlorhexidine Gluconate (chg) Applicator, Procedural Products With A Safety Data Sheet (sds) For The Products Being Offered And Provide Documentation To Support This With Initial Submittal. 12. Vendor Must Provide Chlorhexidine Gluconate (chg) Applicator, Procedural Products With The Following Information On Individual Product Packaging Or On A Package Insert And Provide Documentation To Support With Initial Submittal. A. Product Directions For Use B. Maximal Coverage Area For One Applicator C. Air Drying Time Instructions D. Warning For Use On Infants vendor Instructions: In Support Of Requirement 13 And 14, Vendor Must Provide With Initial Submittal Photographic Images Of The Individual And External Product Packaging For Required Item 5.2. Photographic Images Of Graphic Templates Of Product Labeling Are Not Acceptable Supporting Documentation. Vendor Must Provide A Letter Of Attestation, Including The Part Numbers, For Required Items 5.1, 5.3, And 5.4, Stating That The Offered Products Meet Requirements 13 And 14. 13. Vendor Must Provide Chlorhexidine Gluconate (chg) Applicator, Procedural Products With Individual Packaging That Includes The Following Information: A. Expiration Date As Indicated Per 21 Cfr 201.66 B. Lot Number As Indicated Per 21 Cfr 201.66 C. Single-use As Indicated Per 21 Cfr 201.66 D. Sterile As Indicated Per 21 Cfr 201.66 E. Flammability Warning, With Appropriate Flammability Signal Word(s) As Per 21 Cfr 201.66(c)(5)(ii)(c) 14. Vendor Must Provide Chlorhexidine Gluconate (chg) Applicator, Procedural Products With External Product Packaging (i.e. Box) That Includes The Following Information: A. Flammability Warning, With Appropriate Flammability Signal Word(s) As Per Cfr 201.66(c)(5)(ii)(c). evaluations evaluations For This Product Line Will Be Done By A Panel Of Experts As A Technical Review To Determine Which Vendors Meet The Requirements. Vendors Who Provide All Requested Information And Meet The Requirements Will Be Selected For Inclusion On The Qsl. Vendors Will Be Notified Of Whether They Met Or Did Not Meet The Qsl Requirements By Approximately 07 February 2025. response Information: responses To This Qsl Announcement Must Be Submitted Via Email To The Mmeso Clinical Analyst, Mmeso Project Manager, And Dla Ko Listed Below. vendor Questions Regarding This Qsl Announcement Are Due No Later Than 5:00 Pm Local Philadelphia Time 2 Business Days Before Solicitation Closes. Vendor Responses To This Qsl Announcement Are Due No Later Than 5:00 Pm Local Philadelphia Time On 09 January 2025. all Vendor Correspondence Should Be Emailed To All Of The Following: ms. Andrea Honesto lead Mmeso Clinical Analyst Contractor andrea.l.honesto.ctr@health.mil mr. David Sheaffer mmeso Project Manager Contractor david.v.sheaffer.ctr@health.mil ms. Tara Perrien dla Troop Support Medical Contracting Officer tara.perrien@dla.mil the Contracting Officer Will Address Any Issues/questions Pertaining To Incentive Agreements, Taa Questions, And Extension Requests.

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+2Civil Works Others, Security and Emergency Services
United States
Closing Date3 Jan 2025
Tender AmountRefer Documents 
Details: Page 1 Of 11 Page 1 Of 14 Page 15 Of 16 Page 1 Of Page 1 Of Description This Is A Combined Synopsis Solicitation (css) For Commercial Services Prepared In Accordance With The Format In Far Subpart 12.6, Streamlined Procedures For Evaluation And Solicitation For Commercial Products And Commercial Services., Using Simplified Acquisition Procedures Found At Far Part 13 And As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued. This Solicitation Number 36c24425q0194 Is Being Issued As A Request For Quote (rfq). The Government Anticipates Awarding One, One-year Period Of Performance, Firm-fixed-price Contract Resulting From This Solicitation For The Repairs Specified Only. This Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular (fac) 2024-07 (effective Date 08/29/2024) And Can Be Found At: Far | Acquisition.gov . The Associated North American Industrial Classification System (naics) Code For This Procurement Is 238310 With A Small Business Size Standard Of $19.0 Million And The Product/service Code Is: H912 This Solicitation Is A Service Disabled Veteran Owned Small Business Set-aside. â This Solicitation Requires Registration With The System For Award Management (sam) Prior To Award, Pursuant To Applicable Regulations And Guidelines. Registration Information Is At: Http://www.sam.gov . Confirmation Of Sam Registration Will Be Validated Prior To Awarding A Contract.â â The Veterans Integrated Service Network 04 (visn4), Has A New Requirement For Fire Barrier Repair Services At The Wilkes-barre Va Medical Center As Listed In The Statement Of Work (sow), Attachment A.ââ â The Contractor Shall Provide All Necessary Requirements Cited In The Sow. All Work Is To Be Performed In Accordance With Applicable Federal, State, And Local Regulations Or Ordinances. All Interested Offerors Shall Provide A Quotation For The Following: Pricing Schedule, Attachment B. Place Of Performance: Wilkes-barre Vamc. Visn-04 Intends To Award One-year Contract With A Period Of Performance Of Approximately: 1/10/2025-1/9/2026. A Complete Description Of The Services To Be Acquired, And/or Applicable Government Need(s) Are As Follows: See Attachment A: Statement Of Work. Contracting Office Address: Department Of Veterans Affairs Regional Procurement Office East Network Contracting Office 4 (nco 4) Va Pittsburgh Medical Center 1010 Delafield Rd., Pittsburgh, Pa 15215 Contract Specialist: Andrew Chmielewski 52.212-4, Contract Terms And Conditions - Commercial Products And Commercial Services (nov 2023) 52.252-2 Clauses Incorporated By Reference (feb 1998) This Contract Incorporates One Or More Clauses By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. Also, The Full Text Of A Clause May Be Accessed Electronically At This/these Address(es): Http://www.acquisition.gov/far/index.html Http://www.va.gov/oal/library/vaar/ (end Of Clause) Far Number Title Date 52.203-17 Contractor Employee Whistleblower Rights And Requirement To Inform Employees Of Whistleblower Rights Nov 2023 52.204-9 52.204-13 Personal Identity Verification Of Contractor Personnel System For Award Management Maintenance Jan 2011 Oct 2018 52.204-18 Commercial And Government Entity Code Maintenance Aug 2020 52.232-40 Providing Accelerated Payments To Small Business Subcontractors Mar 2023 Far 52.237-2 Protection Of Government Buildings, Equipment, And Vegetationâ(apr 1984) The Contractorâshallâuse Reasonable Care To Avoid Damaging Existing Buildings, Equipment, And Vegetation On The Government Installation. If The Contractor S Failure To Use Reasonable Care Causes Damage To Any Of This Property, The Contractorâshallâreplace Or Repair The Damage At No Expense To The Government As Theâcontracting Officerâdirects. If The Contractor Fails Or Refuses To Make Such Repair Or Replacement, The Contractorâshallâbe Liable For The Cost, Whichâmayâbe Deducted From The Contract Price. (end Of Clause) Vaar 852.203-70 Commercial Advertising (may 2018) Vaar 852.219-75 Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction (jan 2023) (deviation) (a) Pursuant To 38 U.s.c. 8127(l)(2), The Offeror Certifies That (1) If Awarded A Contract (see Far 2.101 Definition), It Will Comply With The Limitations On Subcontracting Requirement As Provided In The Solicitation And The Resultant Contract, As Follows: (i) Services. In The Case Of A Contract For Services (except Construction), The Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To It To Firms That Are Not Certified Sdvosbs Listed In The Sba Certification Database As Set Forth In 852.219 73 Or Certified Vosbs Listed In The Sba Certification Database As Set Forth In 852.219 74. Any Work That A Similarly Situated Certified Sdvosb/vosb Subcontractor Further Subcontracts Will Count Towards The 50% Subcontract Amount That Cannot Be Exceeded. Other Direct Costs May Be Excluded To The Extent They Are Not The Principal Purpose Of The Acquisition And Small Business Concerns Do Not Provide The Service As Set Forth In 13 Cfr 125.6. (2) The Offeror Acknowledges That This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States. The Offeror Further Acknowledges That This Certification Is Subject To Title 18, United States Code, Section 1001, And, As Such, A False, Fictitious, Or Fraudulent Certification May Render The Offeror Subject To Criminal, Civil, Or Administrative Penalties, Including Prosecution. (3) If Va Determines That An Sdvosb/ Vosb Awarded A Contract Pursuant To 38 U.s.c. 8127 Did Not Act In Good Faith, Such Sdvosb/vosb Shall Be Subject To Any Or All Of The Following: (i) Referral To The Va Suspension And Debarment Committee; (ii) A Fine Under Section 16(g)(1) Of The Small Business Act (15 U.s.c. 645(g)(1)); And (iii) Prosecution For Violating 18 U.s.c. 1001. (b) The Offeror Represents And Understands That By Submission Of Its Offer And Award Of A Contract It May Be Required To Provide Copies Of Documents Or Records To Va That Va May Review To Determine Whether The Offeror Complied With The Limitations On Subcontracting Requirement Specified In The Contract. Contracting Officers May, At Their Discretion, Require The Contractor To Demonstrate Its Compliance With The Limitations On Subcontracting At Any Time During Performance And Upon Completion Of A Contract If The Information Regarding Such Compliance Is Not Already Available To The Contracting Officer. Evidence Of Compliance Includes, But Is Not Limited To, Invoices, Copies Of Subcontracts, Or A List Of The Value Of Tasks Performed. (c) The Offeror Further Agrees To Cooperate Fully And Make Available Any Documents Or Records As May Be Required To Enable Va To Determine Compliance With The Limitations On Subcontracting Requirement. The Offeror Understands That Failure To Provide Documents As Requested By Va May Result In Remedial Action As The Government Deems Appropriate. (d) Offeror Completed Certification/fill-in Required. The Formal Certification Must Be Completed, Signed And Returned With The Offeror S Bid, Quotation, Or Proposal. The Government Will Not Consider Offers For Award From Offerors That Do Not Provide The Certification, And All Such Responses Will Be Deemed Ineligible For Evaluation And Award. Certification I Hereby Certify That If Awarded The Contract, [insert Name Of Offeror] Will Comply With The Limitations On Subcontracting Specified In This Clause And In The Resultant Contract. I Further Certify That I Am Authorized To Execute This Certification On Behalf Of [insert Name Of Offeror]. Printed Name Of Signee: ___________ Printed Title Of Signee: _____________ Signature: ____________ Date: ______________ Company Name And Address: _______________ (end Clause) Vaar 852.232-72 Electronic Submission Of Payment Requests (nov 2018) Vaar 852.242-71 Administrative Contracting Officer (oct 2020) Far 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders-commercial Products And Commercial Services (may 2024). The Following Subparagraphs Are Applicable: Subparagraph (b)(5), (b)(9), (b)(11), (b)(12), (b)(23), (b)(25), (b)(26), (b)(31), (b)(32), (b)(33), (b)(34), (b)(35), (b)(36), (b)(37), (b)(39), (b)(46), (b)(51), (b)(55), (b)(56), (b)(59). Subparagraph (c)(1), (c)(2) Class 25190/ Monetary Wage-fringe Benefits $34.69, (c)(7), (c)(8). The Following Solicitation Provisions Apply To This Acquisition And May Be Incorporated By Reference: 52.252-1 Solicitation Provisions Incorporated By Reference (feb 1998) This Solicitation Incorporates One Or More Solicitation Provisions By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. The Offeror Is Cautioned That The Listed Provisions May Include Blocks That Must Be Completed By The Offeror And Submitted With Its Quotation Or Offer. In Lieu Of Submitting The Full Text Of Those Provisions, The Offeror May Identify The Provision By Paragraph Identifier And Provide The Appropriate Information With Its Quotation Or Offer. Also, The Full Text Of A Solicitation Provision May Be Accessed Electronically At This/these Address(es): Http://www.acquisition.gov/far/index.html Http://www.va.gov/oal/library/vaar/ (end Of Provision) Far Number Title Date 52.204-7 System For Award Management Oct 2018 52.204-16 Commercial And Government Entity Code Reporting Aug 2020 52.229-11 Tax On Certain Foreign Procurements Notice And Representation Jun 2020 852.233-70 852.239-75 Protest Content/alternative Dispute Resolution Information And Communication Technology Accessibility Notice Oct 2018 Feb 2023 52.204-24 Representation Regarding Certain Telecommunications And Video Surveillance (nov 2021) 52.216-1 Type Of Contract (apr 1984) The Government Contemplates Award Of A Firm-fixed-price, Single Period Of Performance Contract Resulting From This Solicitation. 52.233-2 Service Of Protest (sep 2006) Notify The Following: Nicholas Guzenski Through Va Email: Nicholas.guzenski@va.gov 852.233 70, Protest Content/alternative Dispute Resolution (oct 2018) (end Of Clause) Addendum To Far 52.212-1 Instructions To Offerors-commercial Products And Commercial Services: Any Questions Or Concerns Regarding This Solicitation Should Be Forwarded In Writing Via E-mail To The Point Of Contact Listed Below. Quotes In Response To This Rfq Are Due On 2:00 Pm (est), Monday, December 30, 2024. Quotes Shall Be Submitted In Writing And Sent Via Email To Contracting Specialist: Andrew Chmielewski; Andrew.chmielewski@va.gov. Please Insert Solicitation Number 36c24425q0194 Wilkes-barre Fire Barrier Repair Services In The Subject Line Of Your Email. All Submissions Shall Be 5mb Or Less. If The Email Is More Than 5mb, Submit Multiple Emails Labeling Them 1 Of Xx, 2 Of Xx, Etc. Late Submissions Shall Be Treated In Accordance With The Solicitation Provision At Far 52.212-1(f). Any Questions Or Concerns Regarding This Solicitation Shall Be Forwarded In Writing Via Email To The Contracting Specialist By 2:00 Pm Est, Thursday December 26, 2024. Questions Will Not Be Accepted After This Date. Responses To The Offeror S Question(s) Will Be Posted Via An Amendment On Sam.gov / Contract Opportunities Via: Http://www.sam.gov Failure To Follow All Instructions May Result In Offeror(s)s Being Determined As Non-responsive And Be Removed From This Competition. All Proposals Shall Be Valid 60 Days From The Quote Response Date. Offeror(s)s Are Cautioned To Be Responsive To All Requirements In The Sow And To Provide Sufficient Information To Allow For Evaluation Of The Quotes. Offeror S Are Required To Submit The Following: Attachment B: Price Schedule: Please Complete Price Information In The Last Two Columns Of Attachment B And Return With Your Quote. To Facilitate The Award Process, All Quotes Shall Include A Statement Regarding The Terms And Conditions Herein As Follows: "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document Without Modification, Deletion, Or Addition." Or "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document With The Exception, Deletion, Or Addition Of The Following:" And A Statement To Acknowledge Amendments, If Applicable. Cover Letter. Offeror(s)s Shall Submit A Cover Letter Identifying Their Company Name, Contact Information, Cage Code, Sam Unique Entity Id (uei) Number Of The Prime And Any Teaming Partner/subcontractor. Offeror(s)s Shall Include A Completed Copy Of The Provision 52.212-3 With Their Quote If The Offeror(s) Has Not Completed It Electronically In The System For Award Management (sam), Accessed Via: Http://www.sam.gov Offeror(s)s Shall Submit A Technical Capability Which Shall Address The Following At A Minimum: Staffing/contractor Personnel: Explain Ability To Supply Adequate Staff To Perform Gauge Calibration In Accordance With The Sow. Qualifications: Explain Contractor S Ability To Meet Industry Standards In Accordance With The Sow With Regards To Gauge Calibration. The Contractor Must Include A Signed Copy Of Vaar 852.219-75 Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction. This Shall Be Submitted With The Solicitation Attachments. Addendum To 52.212-2 Evaluation Commercial Products And Commercial Services The Government Will Perform An Evaluation Using A Comparative Evaluation Of Each Quote. The Government Will Compare Quotes To One Another In Order To Select The Quote That Best Benefits The Government. Comparative Evaluation Will Be Conducted In Accordance With Far 13.106-2(b)(3). The Following Factors Shall Be Used To Evaluate Offeror(s)s: 1. Price 2. Technical Capability (b) A Written Notice Of Award Or Acceptance Of A Quote, Mailed Or Otherwise Furnished To The Successful Offeror(s) Within The Time For Acceptance Specified In The Quote, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer's Specified Expiration Time, The Government May Accept A Quote, Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award. The Contracting Officer Will Award One, Firm Fixed Price Contract Resulting From This Rfq To The Responsible Offeror(s) Whose Quote Conforming To The Rfq Is Most Advantageous To The Government. Price The Government Reserves The Right To Award To An Offeror With Other Than The Lowest Price. The Award Will Be Made To The Offeror Whose Quote Represents The Best Overall Value To The Government. Technical The Offeror Clearly Demonstrates In Its Response A Clear Understanding Of All The Government S Requirements And Effective Approach For The Completion Of Service In Accordance With The Sow. Past Performance Offerors Must Have A Record Of Satisfactory Or Neutral Past Performance. If No Record Of Past Performance Is Found, The Offeror Will Receive A Rating Of Neutral. The Government Will Utilize But Is Not Limited To Internal Documentation Including Federal Awardee Performance And Information System (fapiis) For Determining The Past Performance Of Offerors. â Section D - Contract Documents, Exhibits, Or Attachmentsâ â See Attached Document: Attachment A Statement Of Work See Attached Document: Attachment B Price Scheduleââ See Attached Document: Attachment C Wage Determination Point Of Contact Combined Synopsis/solicitation Notice Combined Synopsis/solicitation Notice Page 3 Of 3 Combined Synopsis/solicitation Notice *= Required Field Combined Synopsis/solicitation Notice Page 1 Of 3 Andrew Chmielewski Department Of Veterans Affairs Regional Procurement Office East Network Contracting Office 4 (nco 4) 1010 Delafield Rd., Pittsburgh, Pa 15215 Andrew.chmielewski@va.gov End Of Document

Bureau Of The Treasury Tender

Manpower Supply
Philippines
Closing Date3 Jan 2025
Tender AmountPHP 916.9 K (USD 15.8 K)
Details: Description Description : Supply Of Security Services Brief Description : Provision Of Personnel To Perform Security Services To Btr Regional Office Located At Pres. Corazon C. Aquino Regional Government Center, Balintawak, Pagadian City, Zamboanga Del Sur And To The Provincial Offices Of Zamboanga City, Zamboanga Del Norte And Basilan No. Of Days Work : 365 Days Duration Of The Contract : January 01, 2025 To September 30, 2025 Approved Budget For The Contract : Regional Office 2 P 40, 870.00 X 9 Months = P 367, 830.00 Po - Zamboanga City/ Sibugay 1 20,336.00 X 9 Months = 183, 024.00 Po - Zamboanga Del Norte 1 20,336.00 X 9 Months = 183, 024.00 Po - Basilan 1 20,336.00 X 9 Months = 183, 024.00 Total P 101,878.00 P 916,902.00 I. Scope Of Work And Services A. The Security Guard/s Shall Perform The Following: Regional Office - Each Of The Two (2) Security Guards Shall Perform Work Of Eight (8) Hours Per Day, Seven (7) Days A Week Inclusive Of Regular And Special Holidays. Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices - Three (3) Security Guards For The Respective Provincial Offices To Perform Work Of (8) Hours Per Day, Seven (7) Days A Week Inclusive Of Regular And Special Holidays. 1. Safeguard The Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices, Their Attached Structures And Facilities From Fire, Criminal Infiltration, Economic Sabotage, Electronic Attack, Bomb Threats, Flood Damage, Vandalism, And Other Forms Of Physical Destruction. Term Of Reference: Security Agency For Cy 2025 Page 2 Of 9 2. Safeguard The Vehicles, Furniture And Other Materials Against Theft, Robbery, Fire, Arson And Other Form Of Crimes. 3. Safeguard The Btr Personnel, Clients And Visitors Against Harm Or Threats While Within The Offices’ Premises During Official Hours, Including Off-hours Whenever Their Access Are Authorized. 4. Promote And Maintain Peace And Order Within The Premises Of Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices, The Assigned Areas Of Responsibility Including, But Not Limited To, The Designated Restricted And High-risk Areas Within The Premises. 5. Expedite Any And All Activities In Support Of The Mission And Objectives Of The Btr Including All Legal And Lawful Instructions Handed Down By The Higher Authority. 6. Record And Document In The Security Guard’s Logbook Or Journal All Significant Events Occurring In His Area Of Responsibility And/or Report In Writing Any Incident Inimical To The Safety And Integrity Of The Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices. 7. Maintain Proper Decorum, Personal Discipline, Grooming, And Decent Uniform While On Duty And Refrain From Reading Newspapers, Using Cellular Phones And Gadgets, Drinking Alcoholic Beverages, Taking Prohibited Drugs, Or Any Other Activities That Will Cause Distraction In The Proper Performance Of His Duty. 8. Comply With Orders, Circulars, And Other Policies Of The Btr, Including Lawful Orders Of The Regional Director, The Heads Of Provincial Offices, Or Their Authorized Representatives. 9. To Strictly Comply With Republic Act No.5487, As Amended By P.d. 1919, Otherwise Known As The Private Security Law, And Its Implementing Rules And Regulations Issued By The Director General Of The Philippine National Police. Ii. Strategic Areas To Be Covered By Security Services A. Perimeter Area(s); B. All Floors From Ground Floor To Rooftop, Including The Garage And Utility Areas Of The Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices; C. All Property Of The Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices, Beginning From Ground Floor To Rooftop. Term Of Reference: Security Agency For Cy 2025 Page 3 Of 9 Iii. Schedule Of Requirements The Following Shall Be Provided By The Contractor: Item No. Qty. Description Bidder’s/supplier’s Compliance 1. *5 Sgs Security Guards Must Be: I. Filipino Male Citizen Ii. Preferably Those Who Have Completed 72 Units In College. Iii. Preferably With Experience In Guarding Government Facility Iv. Able To Communicate In Oral And Written English. V. Physical And Mentally Fit To Perform Security Duty. Vi. 25-45 Years Of Age. Vii. Minimum Height: 5 Ft. And 5 Inches Viii. Undergone Pre-licensing Training Administered Or Authorized By Pnpsosia. (provide Proof Of Training) Ix. Able To Prepare Investigation/spot Reports. X. Passed Np Evaluation And Drug Testing With Proof Of Compliance. Xi. Must Have Undergone Special Trainings On Anti-terrorism; Basic Fire Safety/prevention And Suppression; Basic First Aid And Self-defense Xii. Must Possess A Valid Security License As Of Bidding Date And During Tour Of Duty (submit Copy Of License). Xiii. Must Exhibit Good Moral Character, Honesty, Alertness. Xiv. Must Not Have Been Charged Nor Convicted Of Any Offense Involving Moral Turpitude (submit Appropriate Clearance, Barangay, Police And Nbi). 2 Materials/equipment/supplies To Be Provided By The Contractor, Per Sg: I. Prescribed Basic Uniforms Ii. Nightstick/baton Iii. Whistle Iv. Timepiece V. Writing Pen Term Of Reference: Security Agency For Cy 2025 Page 4 Of 9 Vi. Notebook And Duty Checklist (electronic Or Not) Vii. Flashlight Viii. First Aid Kit Ix. Service Firearms With Full Capacity Ammo. Load Plus Spare (subj. To Compliance With Pnp Guidelines On The Carrying Of Firearms And Ammunitions). X. Metal Detector Xi. Communication Radio (optional) Xii. Raincoat/pontio The Contractor Shall Provide The Abovementioned Security Personnel With Equipment That Should Be 100% Operational At All Times For The Duration Of The Contract. As To The Issued Firearms, They Must Be Of Genuine Brand Acquired From A Legitimate Source(s). No Paltiks Guns. Iv. Technical Specifications Technical Parameters Based On Gppb Circular No. 24-2007 Item No. Description Bidder’s/supplier’s Compliance 1. Stability Of The Company (a) Years Of Experience I. Has Been In The Business For At Least (3) Years; Ii. Has Experience In Providing Security Service (s) To Government Offices And Financial Institution; And, Iii. Bidders Shall Submit Certification Under Oath Of List Of Contracts Completed For The Past Three (3) Years. (b) Liquidity Of The Contractor Submit Audited Financial Statement For Cy 2020-2021 Duly Stamped By Bir Or Its Accredited And Authorized Institution. (c) Organizational Set-up Organizational Capability Of Any Agency Shall Be Based On Its Compliance With Organizational Structure Of Private Security Agencies Prescribed Under R.a. 5487 And Recent Irrs Implementing The Same. - Submission Of Organizational Chart Showing Key Management Personnel Are Themselves Term Of Reference: Security Agency For Cy 2025 Page 5 Of 9 Qualified And Licensed To Operate And Manage Security Business. - At Least (10%) Of Its Security Guard Force Are Currently Deployed On Important Posting Areas (e.g. Vital Installation, Airports, Power Plants, Banks And Similar Financial Institution And Government Offices). 2 Number Of Licensed Firearms - Agency Shall Have A Minimum Number Of Licensed And Serviceable Firearms (cal.38 Or 9mm For Handguns And/or 12 Gauge For Shotguns) Equivalent To 1/3 Of Their Total Number Of Security Guards; And, - Submit List Of Licensed Firearms 3 Other Factors (a) Recruitment And Selection Criteria - Show The Hiring Process For Security Guards And The Different Training Interventions Given To Security Personnel (b) Completeness Of Uniforms And Other Paraphernalia The Following Shall Comprise The Basic Equipment Of A Security Guard While On Duty: I. Prescribed Basic Uniform With Authorized Black Shoes Ii. Nightstick Or Baton Iii. Whistle Iv. Timepiece (synchronized To City Hall Time) V. Writing Pen Vi. Notebook And Duty Checklist (logbook Paginated And Smythe Sewn) Vii. List Of Emergency Numbers Viii. Flashlight Ix. First Aid Kit X. Service Firearms With Holster Xi. Handcuffs Xii. Communication Radio (optional) Xiii. Stun Devices (optional) Xiv. Raincoat/pontio Term Of Reference: Security Agency For Cy 2025 Page 6 Of 9 V. Other Responsibilities Of The Supplier/contractor A. The Supplier/contractor Shall Ensure That Their Assigned Security Guards To Btr Offices Are Physically And Mentally Fit For Duty During The Duration Of The Contract. Btr Reserves The Right To Require The Assigned Guards To Undergo Physical Fitness Test Before And During The Start Of The Contract. B. The Discipline And Administration Of The Security Guards Shall Conform To The Rules And Regulations Of The Contractor And The Btr. The Rules To Be Set By The Supplier/contractor Should Be Approved By Btr. C. The Supplier’s/contractor’s Personnel Rendering Unsatisfactory Performance, Questionable Actuations Or Behavior Including Repeated Violation Of Btr’s Internal Rules And Policies Shall Be Immediately Replaced Upon Receipt Of Written Memorandum From The Btr. On The Other Hand, The Supplier/contractor Shall Not Replace Security Guards To The Btr Without The Prior Approval From Its Management. D. The Supplier/contractor Shall Provide Its Security Personnel Stationed At The Client’s Offices With At Least (1) Unit License 9mm Handgun With Basic Ammunition Load Plus Extra Loaded Magazine; A Stand-by (1) Unit License 12 Gauge Shotgun To Be Issued Only During Extra-ordinary Situations, I.e., Like Existence Of Rebellion, Widespread Violence, Terroristic Attacks And Situations Calling For A More Heightened Alert. E. The Security Guards Of The Supplier/contractor Shall Never Be Employees Of The Btr. Hence, The Latter Shall Not Be Held Responsible For Any Claims For Compensation In The Event Of Injuries And Death Sustained By The Security Guards Or By Any Third Persons In The Performance By The Latter Of Its Duty With Btr. F. The Supplier’s/contractor’s Security Guards Shall Not Be Allowed To Stay In The Building Premises When On “off-duty”, Except During Times Of Emergency Situations. G. The Supplier/contractor Shall Require Its Security Guards Assigned To Their Respective Stations To Render Services In Accordance With The Contract And This Terms Of Reference. Security Guards Are Expected To Be On The Regional Office’ And Provincial Offices’ Premises At Least (30) Minutes Before The Start Of Duty. H. The Supplier/contractor Shall Prepare At Least Two (2) Relievers To Immediately Assume The Duty From Regular Guards In Case Of Their Absence. I. The Supplier/contractor Shall Require Its Security Guards To Render Services Exceeding The Scheduled Working Hours In The Exigencies Of The Service And/or As The Need May Arise. Absent Security Guards Shall Immediately Be Replaced By Relievers. Term Of Reference: Security Agency For Cy 2025 Page 7 Of 9 J. The Supplier/contractor Shall Assume Full Responsibility For Any Liabilities, Cause/s Of Action Or Claims Which May Be Filed By Any Of The Security Guards Under Labor Laws, Employees Compensation Laws Or Other Special Laws, Rules And Regulations Currently Mandated/implemented By The Department Of Labor And Employment. By Virtue Thereof, The Supplier/contractor Shall Render Btr, Its Officers And Employees, Free And Harmless From Any Such Liabilities, Cause Of Action Or Claims. K. The Supplier/contractor Shall Be Responsible For The Loss, Damage Or Injury That May Be Suffered By Btr Or Its Clients, Personnel And Properties, During The Tour Of Duty Of The Assigned Security Guards. Btr Shall Inform The Supplier/contractor In Writing Within Twenty Four (24) Hours From Its Occurrence Or Discovery. It Is Understood That The Contractor Shall Not Be Liable For Loss/es Or Damage/s Incurred By Btr Due To Fortuitous Events Or Force Majeure, Unless Accompanied By Negligent Acts By The Security Guards Or Their Failure To Take Positive Measures To Prevent Such Loss/es Or Damage/s In Line With Established Contractor And Btr Rules And Policies. Further, The Supplier/contractor Guarantees The Full Compensation For Whatever Loss/es Or Damage/s Which Btr May Sustain On The Occasion Of The Fault And Negligence Of Its Security Guards After Due Investigation Is Conducted On The Matter. L. The Supplier Or Contractor Is Obligated To Submit Proof Of Remittance In Compliance With Various Statutory Social Legislation Measures, Including But Not Limited To Contributions To Sss, Pag-ibig, Philhealth, And Ecc, Retirement Benefits For The Retirement Plan Established Or Remittance To Any Institution Responsible For The Administration And Maintenance Of Such Fund. The Supplier/contractor Shall Also Submit The Monthly Proof Of Payment Of The Basic Pay And Other Benefits Paid Directly To The Guards. This Documentation Must Be Provided To The Bureau Of The Treasury (btr) Within Fifteen (15) Days Following The Conclusion Of Each Month. Failure To Submit The Required Proof Of Remittance Shall Be A Ground For The Suspension Of Contract Payments Until Compliance Is Achieved. Additionally, Any Infringement Of These Standards Or Labor Laws May Result And Constitute As A Ground For The Blacklisting Of The Supplier Or Contractor. M. The Supplier/contractor Shall Comply With Existing Labor Standard Laws And Regulations, Especially In The Payment Of Minimum Wage And Other Statutory Benefits Implemented By Dole, Padpao, And The Pnp. N. In Addition, The Supplier/contractor Shall Submit To Btr The Following Upon Submission Of Their Rfq/proposal: 1. Certification Of Good Standing From The Pnp-sosia (formerly Pnp-sagds) And The Philippine Association Of Detective And Protective Agency Operators (padpao). 2. A Certified Copy Of The License To Operate As A Security Agency From The Pnp Term Of Reference: Security Agency For Cy 2025 Page 8 Of 9 3. Business Permit, Philgeps Certificate, Certificate Of Registration (bir), Tax Clearance, Itr (income Tax Return) O. The Supplier Shall Submit The Cost Distribution Schedule Of Security Services Following The Herein Format. Any Other Benefits May Be Added As Long As The Required Items Specifically Listed Below Are Adhered And Compliant With The Approved Budget Contract. Agency Estimate For Security Guards Factor Days 1st Shift 2nd Shift 393.4 414 414 Estimated Equivalent Monthry Rate = Eemr Payable Directly To Security Guards 1.1 Basic Salary Rate ( Monthly ) Sub- Total 1.2 Night Shift Differential ( Note :only 1 Hour Is Alloted For Night Shift Since Duty Is Only Until 11:00 Pm 1.3 13th Month Pay- 1/12 Of Basic Pay 1.4 Service Incentive Leave Pay - 5 Days Per Year (sil) 1.5 Uniform Allowance 1.6 Retirement Benefit Per Month (eemr * 22.5/12) Sub-total (a) Government Payment 1.7 Sss Premium Er Share (based On Table) 1.8 Sss Ec Er Share (based On Table) 1.9 Philhealth Er Share (5% Total, Shared 50:50 By Ee And Er) 1.10 Sif- Er Share 1.11 Pag_ibig Er Share Sub-total (b) Total Payment To Guards + Gov't ( C) 0.00 0.00 Admin Fee (d)= C * ___% 0.00 0.00 Vat- 12% Of Admin Fee (e )= D *12% 0.00 0.00 Total Vat And Admin Fee 0.00 0.00 Total Contract Cost- Monthly (f )= C + D + E 0.00 0.00 Annual Cost (f * 12 Months) 0.00 0.00 Total Annual Cost To Guards [1st Shift: (h * 4 Guards)] Ro + Zambo. City + Zambo. Del Norte + Basilan 0.00 Total Annual Cost To Guards 2nd Shift Of Regional Office Guard With Night Salary Differential 0.00 Term Of Reference: Security Agency For Cy 2025 Page 9 Of 9 Total First And Second Shift 0.00 Vi. Reservation Clause The Btr Reserves The Right To: Reject Documents That Do Not Comply With The Requirements; To Waive Any Formalities And Documents Or Consider Any Submission Of Documents As Substantial Compliance; To Reject Any And All Bids; To Declare A Failure Of Bidding; To Annul The Bidding Process; Or Not To Award The Contract, Without Thereby Incurring Any Liability To The Affected Potential Supplier Or Bidder/s. This Also Includes The Changes In The Funds/allotment Releases For The Said Program/project/activity Affecting The Award Of Contract, Which Are Either Withheld Or Reduced, At No Fault Of The Btr. The Btr Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidder/s Or Potential Supplier/s For Any Expenses Incurred In The Preparation Of The Bid/proposal. Prepared By: Cesar M. Canoog Jr. Administrative Assistant Ii Approved: Albert Jonathan B. Paulino Director Ii Conformed: _________________________________ Signature Over Printed Nam

DEPT OF THE NAVY USA Tender

Others
United States
Closing Date8 Jan 2025
Tender AmountRefer Documents 
Description: Contact Information|4|n743.6|wvf|564-230-3066|francine.a.pommells.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance - Short Version|8|x||x|||||| variation In Quantity (apr 1984)|3|0%|-5%|total Contract Quantity| time Of Delivery (june 1997)|20|0001|500|365 Days|||||||||||||||||| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo-receiving Report & Invoice - Material|n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material|n50286|tbd|133.2|n/a|n/a|s4306a - Material|n/a|n/a|see Dd1 423|port_ptnh_wawf_notification@navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery||||| warranty Of Data--basic (mar 2014)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|332722|600|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| solicitation Is Amended To Extend The Closing Date To 08jan2025. 1. Data Item A001 (inspection And Test Plan) May Be Waived If Already On Fileat Navsup Wss Mech. 2. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Ofoffers. See Clause 252.213-7000. 3. The Following Proposed Delivery Schedule Applies: submission Of All Certification Data Cdrls 20 Days Prior To Delivery. pnsy Review/acceptance Of Certification Cdrls After Receipt final Delivery Of Material (365 Days) please Quote Actual Delivery Days early And Incremental Delivery Is Acceptable At No Additional Cost To Thegovernment. 4. This Procurement Is Issued Pursuant To Emergency Acquisition Flexibilities. 5. A Variation In Quantity Of -5% Of The Total Contract Quantity Is Allowed.see Far 52.211-16 For Further Details. \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2.2 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order. drawing No Cage Rev Distr Cd ;284593-0001 99657 F B; 2.2.3 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. document Ref Data=fed-std-h28 | | |b |190424|a| | | document Ref Data=fed-std-h28 |0020| |b |941221|a| |01| document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=astm-a574 | | | |211201|a| | | document Ref Data=astm-f606 | | | |191115|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | 3. Requirements 3.1 ;socket Head Cap Screw, To Be In Accordance With Marotta Drawing 284593-0001, Item 67, Except As Amplified Or Modified Herein.; 3.2 The Unit Of Issue Is Each. the Contractor Is Required To Provide One Additional Fastener For Each Uniquely Identified Heat/lot Of Material In Each Shipment. Complete Traceability Must Be Maintained On This Extra Fastener. 3.3 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;socket Head Cap Screw; material - ;cres 431, Cond.ht/mil-dtl-1222; 3.4 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As listed Below. test - ;liquid Penetrant Inspection; item - ;socket Head Cap Screw; performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222 acceptance - Mil-dtl-1222 3.5 Wedge Tensile Test Specimens (headed Fasteners) - A Wedge Tensile Test Must Be Conducted On A Full Size Fastener For Each Production Lot And Reported Aspart Of The Mechanical Properties. The Required Specimens For The Wedge Tensile Test Must Be Separate fasteners From Those Required For The Yield Test. 3.5.1 Testing For Socket Head Cap Screws Must Be In Accordance Mil-dtl-1222, Paragraphs 4.5.2.3 And 4.5.2.3.1. 3.5.2 Testing For All Other Headed Fasteners With A Nominal Diameter Greater Than 1/4-inch Must Be In Accordance With Astm-f606 For Grades 5, 8, B7, And B16.for All Other Grades, The Following Wedge Angles Must Be Used. a. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Of 1/4-inch Through 1-inch (inclusive) Must Be Tested With A Ten Degree Wedge. b. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Over 1-inch Must Be Tested With A Six Degree Wedge. c. Fasteners That Are Of Grades 8, B7, B16, 410, 416, 416se, 431, And 630 And Are Threaded Within One Diameter To The Underside Of The Head Must Be Tested As Follows: sizes 1/4 Inch Through 3/4 Inch (inclusive) Use A Six Degree Wedgesizes Over 3/4 Inch Use A Four Degree Wedge d. Fasteners Which Have Passed Testing With Wedge Angles Greater Than Those Specified Should Be Considered Acceptable. 3.5.3 For Fasteners Having A Length Less Than The Minimum Specified In Table 1 Of Astm-f606, One "test Specimen Fastener" Must Be Manufactured From Each Lot Of Fasteners And Tested To Represent That Lot. The Length Of These Test Specimen Fasteners Must Meet the Minimum Specified In Table 1 Of Astm-f606 But Must Not Exceed It By More Than 1/4 Inch. Test Specimen Fasteners Must Be The Same Type, Style, And Diameter As The Production Lot And Must Be Manufactured From The Same Starting Material, Using The Same manufacturing Techniques As The Production Lot, And Must Be Heat Treated (if Required) Along With The Production Lot. 3.6 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent inspection In Accordance With Asme B1 Series Is Acceptable. 3.6.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement. 3.6.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22 of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222. 3.6.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System. 3.7 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.7.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. 3.8 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.8.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.8.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.8.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.9 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. 3.10 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. ^ Quality Assurance Requirements ^ 3.11 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.12 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.12.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.12.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.12.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.12.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly Notify the Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.12.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.13 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.13.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.13.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.14 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.14.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.14.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.14.3 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.14.4 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.14.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.15 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.15.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.15.2 Inspection For Completeness And Proper Type. 3.15.3 Verification Of Material Quality Received. 3.15.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.15.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.15.6 Identification And Protection From Improper Use Or Disposition. 3.15.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And Necessity for Withholding The Material From Use. 3.15.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.15.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.16 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. 3.16.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein. 3.17 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.18 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.18.1 Quantitative Chemical And Mechanical Analysis Of Material Is Required ;in Accordance With Mil-dtl-1222; .test Reports Must Be Traceable To Traceability Marking On The Material. Material Certification Test Reports Must Include The Class, Form, Condition, grade, Type, Finish, And/or Composition, As Applicable, Of The Material Supplied. 3.18.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, the Original Certification For Chemical Composition Must Be Overstamped And/or Annotated With The Unique Traceability marking Used With The Altered Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ________________ And Heat Treat Number ________________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.18.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.18.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.18.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.19 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The Marking requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Marking Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is Permissible provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.19.1 Fasteners Must Be Marked In Accordance With ;mil-dtl-1222; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked By method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective compounds. 3.19.2 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side Location if Necessary). Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed By Approximately .010" Located On The Top Perimeter Of The Head Of the Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings. 3.20 Material Handling - The Written Material Control Process Must Include The Following: 3.20.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.20.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.20.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats Or Loss Of Traceability. The Traceability Marking must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.20.4 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By The Traceability Marking On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.20.5 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.21 Receiving Inspection - 3.21.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.21.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.22 Discrepancy Reporting - 3.22.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Will Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.23 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.23.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.23.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.23.3 All Data Concerning Material Verification (chemical And Mechanical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification Test Reports must Also Be 100% Inspected For Completeness And Legibility. 3.23.4 All Metallic Material Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.24 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification. 6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order. ;- 10/20/2016 - Updated Ecds Url - Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed - Oct 29 2010 - Added Sampling Std For Li In-process Testing - Sep 30 2008 - Thread Inspection Requirements Were Clarified - Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds - Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe - Dec 17 2011 - Moved Quality Assurance Text Location For Readability - Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes - Jan 19 2011 - Added Notification Of Dcma Upon Contract Award - May 02 2009 - Added Lubricants And Sealants To The C Of C - Aug 27 2014 - Took Out Contractor's Phone Number Requirement - Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section - Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section; date Of First Submission=asreq paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance.

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others
United States
Closing Date6 Jan 2025
Tender AmountRefer Documents 
Details: Sources Sought Notice sources Sought: This Is Not A Solicitation For A Proposal, Proposal Abstract, Or Quote. The Purpose Of This Notice Is To Obtain Information Regarding Qualified Business Sources. The Responses To The Information Requested Will Assist The Government In Determining The Appropriate Acquisition Method. statement Of Work (sow) the Contractor Shall Render Genetic Testing Laboratory Services In Accordance With This Statement Of Work To Support The Health Science Research Department At Durham Va Medical Center Under The Direction Of Dr. Deepak Voora, Executive Director Of National Pharmacogenomics Program At Va Central Office, For The Study/iir Titled, Reducing Veterans' Risk Of Atherosclerotic Cardiovascular Disease Through Pharmacogenomics Informed Statin Prescribing Funded By The Va Durham Healthcare System And Delivered To The Indianapolis Va Health Care System. description: Genomic Medicine Research Has Many Complexities Requiring Specialized Services, Skills, And Expertise, Including Complex Laboratory Analyses Requiring Specialized Equipment And Expertise In The Generation And Interpretation Of Genomic Data; Large Complex Genomic Datasets With Particular Storage, Privacy, And Information Security Requirements; Clinical Expertise In How Genomic Medicine Interventions Might Inform Health Care And Impact Health Outcomes; And Sensitivity To The Ethical, Psychosocial, Legal, And Regulatory Considerations Of Genomic Medicine Research. background: This Research Grant Proposes A Single Center, Randomized Clinical Trial Of Precision Statin Prescribing Versus Usual Care To Be Conducted At The Indianapolis Va Health Care System. Four-hundred And Ten (410) Veteran Patients Who Are At Risk For Cardiovascular Events And Have A Class I Indication For Statin Therapy, But Are Not Currently Prescribed One, Will Be Recruited And Randomly Allocated To Receive Either 1) Genetic Test Report That Provides An Assessment Of Their Risk For Cardiovascular Disease Events Based On A Polygenic Risk Score (prs) For Coronary Artery Disease And Their Risk Of Statin Associated Musculoskeletal Symptoms Based On Slco1b1 Genetic Testing Or 2) Usual Care. Specimens For Genetic Testing Will Be Collected Via Saliva Kit Administered With The Assistance Of Research Staff And Shipped Using A Common Carrier Delivery Service And Standard Chain Of Custody. description Of Work: The Contractor S Laboratory Services Shall Be In Accordance With Clinical Laboratory Improvement Amendments (clia) And Be A College Of American Pathologists (cap) Certified Clinical Diagnostic Genetic Testing Laboratory In Order To Successfully Perform The Required Genetic Testing For This Study. the Performing Laboratory Will Perform Dna Testing For A Prs For Cad And Slco1b1 Based Dna Sequencing, Pcr, Or Array-based Technologies, Analysis, Interpretation, And Reporting For This Study. the Certification And Accreditation (c&a) Requirements Do Not Apply, And That A Security Accreditation Package Is Not Required. primary Contractor Duties Include, But Are Not Limited To: specimen Accessioning, Extraction, And Test Management dna Sequencing And/or Genotyping For polygenic Risk Score (prs) For Coronary Artery Disease Cad genome Wide Genotyping/sequencing whole Genome Imputation variant Calling sample Qc genetic Variant Qc ancestry Specific Prs Calculation For Cad prs Interpretation And Report In Pdf Format slco1b1 Genetic Testing genotyping/sequencing variant Calling sample/variant Qc Star Allele Diplotype And Phenotype Interpretation Based On The Clinical Pharmacogenetics Implementation Consortium (cpic) Guidelines. reporting In Pdf Format each Laboratory Tests Unit Shall Include: saliva Swab Dna Collection Kit genome-wide Genotyping With Illumina Iscan Microarray Technology whole Genome Imputation variant Calling sample Qc (call Rate, Nominal Coverage, Heterozygosity Rate) genetic Variant Qc (genotype Probability) ancestry Specific Prs Calculation For Cad Prs cad Prs Reporting In Pdf Format slco1b1 Testing And Reporting In Pdf Format deliverables: Specific Items To Be Delivered To The Va Investigators, Include, But Are Not Limited To: human Specimen Sample Collection Supplies And Shipping Materials, Compliant With All Current Federal Regulations. clinical Polygenic Risk Score And Slco1b1 Report For Participants Randomized To The Genetic Testing Arm Of The Study. a Required Total Of An Estimated 68 Tests Per Year For Three (3) Years. other Pertinent Information: the Contractor Shall Provide Services For Both Components Of Necessary Testing: 1. Polygenic Risk Score For Coronary Artery Disease And 2. Slco1b1 Genetic Testing. the Contractor Shall Provide An Existing Ldt That They Have Available For The Purposes In This Statement Of Work, As Va Does Not Have An Ldt For These Purposes. The Vendor Shall Have An Existing Ldt As The Va Will Use The Ldt Within One Month Of The Contract Being Awarded. the Contractor Shall Not Work In Conjunction With Another Laboratory For The Polygenic Risk Score Or The Genetic Testing For Slco1b1 As Subcontracting Out And Shipping Samples From One Contractor S Laboratory To Another Is Not Within Best Interest Of The Va S Need At This Time. the Contractor S Services Shall Be Available Readily To Render To Va, In House, At Time Of Contract Award. timeframe: The Estimated Beginning And Ending Dates During Which The Contractor Is Required To Perform Work For Va Durham Are 1/13/2025 To 1/12/2026 With The Option To Renew Yearly Through 1/13/2028. va Information And Information System Security And Privacy Language 1. General. This Entire Section Applies To All Acquisitions Requiring Any Information Security And Privacy Language. Contractors, Contractor Personnel, Subcontractors And Subcontractor Personnel Will Be Subject To The Same Federal Laws, Regulations, Standards, Va Directives And Handbooks, As Va Personnel Regarding Information And Information System Security And Privacy. 2. Va Information Custodial Language. This Entire Section Applies To All Acquisitions Requiring Any Information Security And Privacy Language. a. The Government Shall Receive Unlimited Rights To Data/intellectual Property First Produced And Delivered In The Performance Of This Contract Or Order (hereinafter Contract ) Unless Expressly Stated Otherwise In This Contract. This Includes All Rights To Source Code And All Documentation Created In Support Thereof. The Primary Clause Used To Define Government And Contractor Data Rights Is Far 52.227-14 Rights In Data General. The Primary Clause Used To Define Computer Software License (not Data/intellectual Property First Produced Under This Contractor Or Order) Is Far 52.227-19, Commercial Computer Software License. b. Information Made Available To The Contractor By Va For The Performance Or Administration Of This Contract Will Be Used Only For The Purposes Specified In The Service Agreement, Sow, Pws, Pd, And/or Contract. The Contractor Shall Not Use Va Information In Any Other Manner Without Prior Written Approval From A Va Contracting Officer (co). The Primary Clause Used To Define Government And Contractor Data Rights Is Far 52.227-14 Rights In Data General. c. Va Information Will Not Be Co-mingled With Any Other Data On The Contractor S Information Systems Or Media Storage Systems. The Contractor Shall Ensure Compliance With Federal And Va Requirements Related To Data Protection, Data Encryption, Physical Data Segregation, Logical Data Segregation, Classification Requirements And Media Sanitization. d. Va Reserves The Right To Conduct Scheduled Or Unscheduled Audits, Assessments, Or Investigations Of Contractor Information Technology (it) Resources To Ensure Information Security Is Compliant With Federal And Va Requirements. The Contractor Shall Provide All Necessary Access To Records (including Electronic And Documentary Materials Related To The Contracts And Subcontracts) And Support (including Access To Contractor And Subcontractor Staff Associated With The Contract) To Va, Va's Office Inspector General (oig), And/or Government Accountability Office (gao) Staff During Periodic Control Assessments, Audits, Or Investigations. e. The Contractor May Only Use Va Information Within The Terms Of The Contract And Applicable Federal Law, Regulations, And Va Policies. If New Federal Information Security Laws, Regulations Or Va Policies Become Applicable After Execution Of The Contract, The Parties Agree To Negotiate Contract Modification And Adjustment Necessary To Implement The New Laws, Regulations, And/or Policies. f. The Contractor Shall Not Make Copies Of Va Information Except As Specifically Authorized And Necessary To Perform The Terms Of The Contract. If Copies Are Made For Restoration Purposes, After The Restoration Is Complete, The Copies Shall Be Destroyed In Accordance With Va Directive 6500, Va Cybersecurity Program And Va Information Security Knowledge Service. g. If A Veterans Health Administration (vha) Contract Is Terminated For Default Or Cause With A Business Associate, The Related Local Business Associate Agreement (baa) Shall Also Be Terminated And Actions Taken In Accordance With Vha Directive 1605.05, Business Associate Agreements. If There Is An Executed National Baa Associated With The Contract, Va Will Determine What Actions Are Appropriate And Notify The Contactor. h. The Contractor Shall Store And Transmit Va Sensitive Information In An Encrypted Form, Using Va-approved Encryption Tools Which Are, At A Minimum, Federal Information Processing Standards (fips) 140-2, Security Requirements For Cryptographic Modules (or Its Successor) Validated And In Conformance With Va Information Security Knowledge Service Requirements. The Contractor Shall Transmit Va Sensitive Information Using Va Approved Transport Layer Security (tls) Configured With Fips Based Cipher Suites In Conformance With National Institute Of Standards And Technology (nist) 800-52, Guidelines For The Selection, Configuration And Use Of Transport Layer Security (tls) Implementations. the Contractor S Firewall And Web Services Security Controls, As Applicable, Shall Meet Or Exceed Va S Minimum Requirements. j. Except For Uses And Disclosures Of Va Information Authorized By This Contract For Performance Of The Contract, The Contractor May Use And Disclose Va Information Only In Two Situations: (i) In Response To A Qualifying Order Of A Court Of Competent Jurisdiction After Notification To Va Co (ii) With Written Approval From The Va Co. The Contractor Shall Refer All Requests For, Demands For Production Of Or Inquiries About, Va Information And Information Systems To The Va Co For Response. k. Notwithstanding The Provision Above, The Contractor Shall Not Release Va Records Protected By Title 38 U.s.c. § 5705, Confidentiality Of Medical Qualityassurance Records And/or Title 38 U.s.c. § 7332, Confidentiality Of Certain Medical Records Pertaining To Drug Addiction, Sickle Cell Anemia, Alcoholism Or Alcohol Abuse Or Infection With Human Immunodeficiency Virus (hiv). If The Contractor Is In Receipt Of A Court Order Or Other Requests For The Above Mentioned Information, The Contractor Shall Immediately Refer Such Court Order Or Other Requests To The Va Co For Response. l. Information Made Available To The Contractor By Va For The Performance Or Administration Of This Contract Or Information Developed By The Contractor In Performance Or Administration Of The Contract Will Be Protected And Secured In Accordance With Va Directive 6500 And Identity And Access Management (iam) Security Processes Specified In The Va Information Security Knowledge Service. m. Any Data Destruction Done On Behalf Of Va By A Contractor Shall Be Done In Accordance With National Archives And Records Administration (nara) Requirements As Outlined In Va Directive 6300, Records And Information Management, Va Handbook 6300.1, Records Management Procedures, And Applicable Va Records Control Schedules. n. The Contractor Shall Provide Its Plan For Destruction Of All Va Data In Its Possession According To Va Directive 6500 And Nist 800-88, Guidelines For Media Sanitization Prior To Termination Or Completion Of This Contract. If Directed By The Cor/co, The Contractor Shall Return All Federal Records To Va For Disposition. o. Any Media, Such As Paper, Magnetic Tape, Magnetic Disks, Solid State Devices Or Optical Discs That Is Used To Store, Process, Or Access Va Information That Cannot Be Destroyed Shall Be Returned To Va.the Contractor Shall Hold The Appropriate Material Until Otherwise Directed By The Contracting Officer S Representative (cor) Or Co. Items Shall Be Returned Securely Via Va-approved Methods. Va Sensitive Information Must Be Transmitted Utilizing Va-approved Encryption Tools Which Are Validated Under Fips 140-2 (or Its Successor) And Nist 800-52. If Mailed, The Contractor Shall Send Via A Trackable Method (usps, Ups, Fedex, Etc.) And Immediately Provide The Cor/co With The Tracking Information. Self-certification By The Contractor That The Data Destruction Requirements Above Have Been Met Shall Be Sent To The Cor/co Within 30 Business Days Of Termination Of The Contract. p. All Electronic Storage Media (hard Drives, Optical Disks, Cds, Back-up Tapes, Etc.) Used To Store, Process Or Access Va Information Will Not Be Returned To The Contractor At The End Of Lease, Loan, Or Trade-in. Exceptions To This Paragraph Will Only Be Granted With The Written Approval Of The Va Co. 3. Access To Va Information And Va Information Systems. This Section Applies When Any Person Requires Access To Information Made Available To The Contractor By Va For The Performance Or Administration Of This Contract Or Information Developed By The Contractor In Performance Or Administration Of The Contract. a. A Contractor/subcontractor Shall Request Logical (technical) Or Physical Access To Va Information And Va Information Systems For Their Employees And Subcontractors Only To The Extent Necessary To Perform The Services Specified In The Solicitation Or Contract. This Includes Indirect Entities, Both Affiliate Of Contractor/subcontractor And Agent Of Contractor/subcontractor. b. Contractors And Subcontractors Shall Sign The Va Information Security Rule Of Behavior (rob) Before Access Is Provided To Va Information And Information Systems (see Section 4, Training, Below). The Rob Contains The Minimum User Compliance Requirements And Does Not Supersede Any Policies Of Va Facilities Or Other Agency Components Which Provide Higher Levels Of Protection To Va S Information Or Information Systems. Users Who Require Privileged Access Shall Complete The Va Elevated Privilege Access Request Processes Before Privileged Access Is Granted. c. All Contractors And Subcontractors Working With Va Information Are Subject To The Same Security Investigative And Clearance Requirements As Those Of Va Appointees Or Employees Who Have Access To The Same Types Of Information. The Level And Process Of Background Security Investigations For Contractors Shall Be In Accordance With Va Directive And Handbook 0710, Personnel Suitability And Security Program. The Office Of Human Resources And Administration/operations, Security And Preparedness (hra/osp) Is Responsible For These Policies And Procedures. Contract Personnel Who Require Access To Classified Information Or Information Systems Shall Have An Appropriate Security Clearance. Verification Of A Security Clearance Shall Be Processed Through The Special Security Officer Located In Hra/osp. Contractors Shall Conform To All Requirements Stated In The National Industrial Security Program Operating Manual (nispom). d. All Contractors And Subcontractors Shall Comply With Conditions Specified In Vaar 852.204-71(d); Contractor Operations Required To Be In United States. All Contractors And Subcontractors Working With Va Information Must Be Permanently Located Within A Jurisdiction Subject To The Law Of The United States Or Its Territories To The Maximum Extent Feasible. If Services Are Proposed To Be Performed Abroad The Contractor Must State Where All Non-u.s. Services Are Provided. The Contractor Shall Deliver To Va A Detailed Plan Specifically Addressing Communications, Personnel Control, Data Protection And Potential Legal Issues. The Plan Shall Be Approved By The Cor/co In Writing Prior To Access Being Granted. e. The Contractor Shall Notify The Cor/co In Writing Immediately (no Later Than 24 Hours) After Personnel Separation Or Occurrence Of Other Causes. Causes May Include The Following: (1) Contractor/subcontractor Personnel No Longer Has A Need For Access To Va Information Or Va Information Systems. (2) Contractor/subcontractor Personnel Are Terminated, Suspended, Or Otherwise Has Their Work On A Va Project Discontinued For Any Reason. (3) Contractor Believes Their Own Personnel Or Subcontractor Personnel May Pose A Threat To Their Company S Working Environment Or To Any Companyowned Property. This Includes Contractor-owned Assets, Buildings, Confidential Data, Customers, Employees, Networks, Systems, Trade Secrets And/or Va Data. (4) Any Previously Undisclosed Changes To Contractor/subcontractor Background History Are Brought To Light, Including But Not Limited To Changes To Background Investigation Or Employee Record. (5) Contractor/subcontractor Personnel Have Their Authorization To Work In The United States Revoked. (6) Agreement By Which Contractor Provides Products And Services To Va Has Either Been Fulfilled Or Terminated, Such That Va Can Cut Off Electronic And/or Physical Access For Contractor Personnel. f. In Such Cases Of Contract Fulfillment, Termination, Or Other Causes; The Contractor Shall Take The Necessary Measures To Immediately Revoke Access To Va Network, Property, Information, And Information Systems (logical And Physical) By Contractor/subcontractor Personnel. These Measures Include (but Are Not Limited To): Removing And Then Securing Personal Identity Verification (piv) Badges And Piv Interoperable (piv-i) Access Badges, Va-issued Photo Badges, Credentials For Va Facilities And Devices, Va-issued Laptops, And Authentication Tokens. Contractors Shall Notify The Appropriate Va Cor/co Immediately To Initiate Access Removal. g. Contractors/subcontractors Who No Longer Require Va Accesses Will Return Vaissued Property To Va. This Property Includes (but Is Not Limited To): Documents, Electronic Equipment, Keys, And Parking Passes. Piv And Piv-i Access Badges Shall Be Returned To The Nearest Va Piv Badge Issuance Office. Once They Have Had Access To Va Information, Information Systems, Networks And Va Property In Their Possessions Removed, Contractors Shall Notify The Appropriate Va Cor/co. 4. Training. This Entire Section Applies To All Acquisitions Which Include Section 3. a. All Contractors And Subcontractors Requiring Access To Va Information And Va Information Systems Shall Successfully Complete The Following Before Being Granted Access To Va Information And Its Systems: (1) Va Privacy And Information Security Awareness And Rules Of Behavior Course (talent Management System (tms) #10176) Initially And Annually Thereafter. (2) Sign And Acknowledge (electronically Through Tms #10176) Understanding Of And Responsibilities For Compliance With The Organizational Rules Of Behavior, Relating To Access To Va Information And Information Systems Initially And Annually Thereafter; And (3) Successfully Complete Any Additional Cyber Security Or Privacy Training, As required For Va Personnel With Equivalent Information System Or Information Access [to Be Defined By The Va Program Official And Provided To The Va Co For Inclusion In The Solicitation Document I.e., Any Rolebased Information Security Training]. b. The Contractor Shall Provide To The Cor/co A Copy Of The Training Certificates And Certification Of Signing The Organizational Rules Of Behavior For Each Applicable Employee Within Five Days Of The Initiation Of The Contract And Annually Thereafter, As Required. c. Failure To Complete The Mandatory Annual Training Is Grounds For Suspension Or Termination Of All Physical Or Electronic Access Privileges And Removal From Work On The Contract Until Such Time As The Required Training Is Complete. 5. Security Incident Investigation. This Entire Section Applies To All Acquisitions Requiring Any Information Security And Privacy Language. a. The Contractor, Subcontractor, Their Employees, Or Business Associates Shall Immediately (within One Hour) Report Suspected Security / Privacy Incidents To The Va Oit S Enterprise Service Desk (esd) By Calling (855) 673-4357 (tty: 711). The Esd Is Oit S 24/7/365 Single Point Of Contact For It-related Issues. After Reporting To The Esd, The Contractor, Subcontractor, Their Employees, Or Business Associates Shall, Within One Hour, Provide The Cor/co The Incident Number Received From The Esd. b. To The Extent Known By The Contractor/subcontractor, The Contractor/ Subcontractor's Notice To Va Shall Identify The Information Involved And The Circumstances Surrounding The Incident, Including The Following: (1) The Date And Time (or Approximation Of) The Security Incident Occurred. (2) The Names Of Individuals Involved (when Applicable). (3) The Physical And Logical (if Applicable) Location Of The Incident. (4) Why The Security Incident Took Place (i.e., Catalyst For The Failure). (5) The Amount Of Data Belonging To Va Believed To Have Been Compromised. (6) The Remediation Measures The Contractor Is Taking To Ensure No Future Incidents Of A Similar Nature. c. After The Contractor Has Provided The Initial Detailed Incident Summary To Va, They Will Continue To Provide Written Updates On Any New And Relevant Circumstances Or Facts They Discover. The Contractor, Subcontractor, And Their Employes Shall Fully Cooperate With Va Or Third-party Entity Performing An Independent Risk Analysis On Behalf Of Va. Failure To Cooperate May Be Deemed A Material Breach And Grounds For Contract Termination. d. Va It Contractors Shall Follow Va Handbook 6500, Risk Management Framework For Va Information Systems Va Information Security Program, And Va Information Security Knowledge Service Guidance For Implementing An Incident Response Plan Or Integrating With An Existing Va Implementation. e. In Instances Of Theft Or Break-in Or Other Criminal Activity, The Contractor/subcontractor Must Concurrently Report The Incident To The Appropriate Law Enforcement Entity (or Entities) Of Jurisdiction, Including The Va Oig, And The Va Office Of Security And Law Enforcement. The Contractor, Its Employees, And Its Subcontractors And Their Employees Shall Cooperate With Va And Any Law Enforcement Authority Responsible For The Investigation And Prosecution Of Any Possible Criminal Law Violation(s) Associated With Any Incident. The Contractor/subcontractor Shall Cooperate With Va In Any Civil Litigation To Recover Va Information, Obtain Monetary Or Other Compensation From A Third Party For Damages Arising From Any Incident, Or Obtain Injunctive Relief Against Any Third Party Arising From, Or Related To, The Incident. f. The Contractor Shall Comply With Va Handbook 6500.2, Management Of Breaches Involving Sensitive Personal Information, Which Establishes The Breach Management Policies And Assigns Responsibilities For The Oversight, Management And Reporting Procedures Associated With Managing Of Breaches. g. With Respect To Unsecured Protected Health Information (phi), The Contractor Is Deemed To Have Discovered A Data Breach When The Contractor Knew Or Should Have Known Of Breach Of Such Information. When A Business Associate Is Part Of Vha Contract, Notification To The Covered Entity (vha) Shall Be Made In Accordance With The Executed Baa. h. If The Contractor Or Any Of Its Agents Fails To Protect Va Sensitive Personal Information Or Otherwise Engages In Conduct Which Results In A Data Breach Involving Any Va Sensitive Personal Information The Contractor/subcontractor Processes Or Maintains Under The Contract; The Contractor Shall Pay Liquidated Damages To The Va As Set Forth In Clause 852.211-76, Liquidated Damages Reimbursement For Data Breach Costs 6. Information System Design And Development. This Entire Section Applies To Information Systems, Systems, Major Applications, Minor Applications, Enclaves, And Platform Information Technologies (to Include The Subcomponents Of Each) Designed Or Developed For Or On Behalf Of Va By Any Non-va Entity. a. Information Systems Designed Or Developed On Behalf Of Va At Non-va Facilities Shall Comply With All Applicable Federal Law, Regulations, And Va Policies. This Includes Standards For The Protection Of Electronic Protected Health Information (phi), Outlined In 45 C.f.r. Part 164, Subpart C And Information And System Security Categorization Level Designations In Accordance With Fips 199, Standards For Security Categorization Of Federal Information And Information Systems And Fips 200, Minimum Security Requirements For Federal Information Systems. Baseline Security Controls Shall Be Implemented Commensurate With The Fips 199 System Security Categorization (reference Va Handbook 6500 And Va Trusted Internet Connections (tic) Architecture). b. Contracted New Developments Require Creation, Testing, Evaluation, And Authorization In Compliance With Va Assessment And Authorization (a&a) Processes In Va Handbook 6500 And Va Information Security Knowledge Service To Obtain An Authority To Operate (ato). Va Directive 6517, Risk Management Framework For Cloud Computing Services, Provides The Security And Privacy Requirements For Cloud Environments. c. Va It Contractors, Subcontractors And Third-party Service Providers Shall Address And/or Integrate Applicable Va Handbook 6500, Va Handbook 6517, Risk Management Framework For Cloud Computing Services And Information Security Knowledge Service Specifications In Delivered It Systems/solutions, Products And/or Services. If Systems/solutions, Products And/or Services Do Not Directly Match Va Security Requirements, The Contractor Shall Work Though The Cor/co To Identify The Va Organization Responsible For Governance Or Resolution. Contractors Shall Comply With Far 39.1, Specifically The Prohibitions Referenced. d. The Contractor (including Producers And Resellers) Shall Comply With Office Of Management And Budget (omb) M-22-18 And M-23-16 When Using Third-party Software On Va Information Systems Or Otherwise Affecting The Va Information. This Includes New Software Purchases And Software Renewals For Software Developed Or Modified By Major Version Change After The Issuance Date Of M22-18 (september 14, 2022). The Term Software Includes Firmware, Operating Systems, Applications And Application Services (e.g., Cloud-based Software), As Well As Products Containing Software. The Contractor Shall Provide A Self Attestation That Secure Software Development Practices Are Utilized As Outlined By Executive Order (eo)14028 And Nist Guidance. A Third-party Assessment Provided By Either A Certified Federal Risk And Authorization Management Program (fedramp) Third Party Assessor Organization (3pao) Or One Approved By The Agency Will Be Acceptable In Lieu Of A Software Producer's Self Attestation. e. The Contractor Shall Ensure All Delivered Applications, Systems And Information Systems Are Compliant With Homeland Security Presidential Directive (hspd) 12 And Va Identity And Access Management (iam) Enterprise Identity Management Requirements As Set Forth In Omb M-19-17, M-05-24, Fips 201-3, Personal Identity Verification (piv) Of Federal Employees And Contractors (or Its Successor), M-21-31 And Supporting Nist Guidance. This Applies To Commercial Off-the-shelf (cots) Product(s) That The Contractor Did Not Develop, All Software Configurations And All Customizations. f. The Contractor Shall Ensure All Contractor Delivered Applications And Systems Provide User Authentication Services Compliant With Va Handbook 6500, Va Information Security Knowledge Service, Iam Enterprise Requirements And Nist 800-63, Digital Identity Guidelines, For Direct, Assertion-based Authentication And/or Trust-based Authentication, As Determined By The Design And Integration Patterns. Direct Authentication At A Minimum Must Include Public Key Infrastructure (pki) Based Authentication Supportive Of Piv And/or Common Access Card (cac), As Determined By The Business Need And Compliance With Va Information Security Knowledge Service Specifications. g. The Contractor Shall Use Va Authorized Technical Security Baseline Configurations And Certify To The Cor That Applications Are Fully Functional And Operate Correctly As Intended On Systems In Compliance With Va Baselines Prior To Acceptance Or Connection Into An Authorized Va Computing Environment. If The Defense Information Systems Agency (disa) Has Created A Security Technical Implementation Guide (stig) For The Technology, The Contractor May Configure To Comply With That Stig. If Va Determines A New Or Updated Va Configuration Baseline Needs To Be Created, The Contractor Shall Provide Required Technical Support To Develop The Configuration Settings. Far 39.1 Requires The Population Of Operating Systems And Applications Includes All Listed On The Nist National Checklist Program Checklist Repository. h. The Standard Installation, Operation, Maintenance, Updating And Patching Of Software Shall Not Alter The Configuration Settings From Va Approved Baseline Configuration. Software Developed For Va Must Be Compatible With Va Enterprise Installer Services And Install To The Default Program Files Directory With Silently Install And Uninstall. The Contractor Shall Perform Testing Of All Updates And Patching Prior To Implementation On Va Systems. i. Applications Designed For Normal End Users Will Run In The Standard User Context Without Elevated System Administration Privileges. j. The Contractor-delivered Solutions Shall Reside On Va Approved Operating Systems. Exceptions To This Will Only Be Granted With The Written Approval Of The Cor/co. k. The Contractor Shall Design, Develop, And Implement Security And Privacy Controls In Accordance With The Provisions Of Va Security System Development Life Cycle Outlined In Nist 800-37, Risk Management Framework For Information Systems And Organizations: A System Life Cycle Approach For Security And Privacy, Va Directive And Handbook 6500, And Va Handbook 6517. l. The Contractor Shall Comply With The Privacy Act Of1974 (the Act), Far 52.224-2 Privacy Act, And Va Rules And Regulations Issued Under The Act In The Design, Development, Or Operation Of Any System Of Records On Individuals To Accomplish A Va Function. m. The Contractor Shall Ensure The Security Of All Procured Or Developed Information Systems, Systems, Major Applications, Minor Applications, Enclaves And Platform Information Technologies, Including Their Subcomponents (hereinafter Referred To As Information Systems ) Throughout The Life Of This Contract And Any Extension, Warranty, Or Maintenance Periods. This Includes Security Configurations, Workarounds, Patches, Hotfixes, Upgrades, Replacements And Any Physical Components Which May Be Necessary To Remediate All Security Vulnerabilities Published Or Known To The Contractor Anywhere In The Information Systems (including Systems, Operating Systems, Products, Hardware, Software, Applications And Firmware). The Contractor Shall Ensure Security Fixes Do Not Negatively Impact The Information Systems. n. When The Contractor Is Responsible For Operations Or Maintenance Of The Systems, The Contractor Shall Apply The Security Fixes Within The Timeframe Specified By The Associated Controls On The Va Information Security Knowledge Service. When Security Fixes Involve Installing Third Party Patches (such As Microsoft Os Patches Or Adobe Acrobat), The Contractor Shall Provide Written Notice To The Va Cor/co That The Patch Has Been Validated As To Not Affecting The Systems Within 10 Business Days. 7. Information System Hosting, Operation, Maintenance Or Use. this Entire Section Applies To Information Systems, Systems, Major Applications, Minor Applications, Enclaves, And Platform Information Technologies (cloud And Noncloud) Hosted, Operated, Maintained, Or Used On Behalf Of Va At Non-va Facilities. a. The Contractor Shall Comply With All Federal Laws, Regulations, And Va Policies For Information Systems (cloud And Non-cloud) That Are Hosted, Operated, Maintained, Or Used On Behalf Of Va At Non-va Facilities. Security Controls For Collecting, Processing, Transmitting, And Storing Of Va Sensitive Information, Must Be In Place. The Controls Will Be Tested By Va Or A Va Sanctioned 3paoand Approved By Va Prior To Hosting, Operation, Maintenance Or Use Of The Information System Or Systems By Or On Behalf Of Va. This Includes Conducting Compliance Risk Assessments, Security Architecture Analysis, Routine Vulnerability Scanning, System Patching, Change Management Procedures And The Completion Of An Acceptable Contingency Plan For Each System. The Contractor S Security Control Procedures Shall Be The Same As Procedures Used To Secure Va-operated Information Systems. b. Outsourcing (contractor Facility, Equipment, Or Staff) Of Systems Or Network Operations, Telecommunications Services Or Other Managed Services Require Assessment And Authorization (a&a) Of The Contractor S Systems In Accordance With Va Handbook 6500 As Specified In Va Information Security Knowledge Service. Major Changes To The A&a Package May Require Reviewing And Updating All The Documentation Associated With The Change. The Contractor S Cloud Computing Systems Shall Comply With Fedramp And Va Directive 6517 Requirements. c. The Contractor Shall Return All Electronic Storage Media (hard Drives, Optical Disks, Cds, Back-up Tapes, Etc.) On Non-va Leased Or Non-va Owned It Equipment Used To Store, Process Or Access Va Information To Va In Accordance With A&a Package Requirements. This Applies When The Contract Is Terminated Or Completed And Prior To Disposal Of Media. The Contractor Shall Provide Its Plan For Destruction Of All Va Data In Its Possession According To Va Information Security Knowledge Service Requirements And Nist 800-88. The Contractor Shall Send A Self-certification That The Data Destruction Requirements Above Have Been Met To The Cor/co Within 30 Business Days Of Termination Of The Contract. d. All External Internet Connections To Va Network Involving Va Information Must Be In Accordance With Va Trusted Internet Connection (tic) Reference Architecture And Va Directive And Handbook 6513, Secure External Connections And Reviewed And Approved By Va Prior To Implementation. Government-owned Contractor-operated Systems, Third Party Or Business Partner Networks Require A Memorandum Of Understanding (mou) And Interconnection Security Agreements (isa). e. Contractor Procedures Shall Be Subject To Periodic, Announced, Or Unannounced Assessments By Va Officials, The Oig Or A 3pao. The Physical Security Aspects Associated With Contractor Activities Are Also Subject To Such Assessments. The Contractor Shall Report, In Writing, Any Deficiencies Noted During The Above Assessment To The Va Cor/co. The Contractor Shall Use Va S Defined Processes To Document Planned Remedial Actions That Address Identified Deficiencies In Information Security Policies, Procedures, And Practices. The Contractor Shall Correct Security Deficiencies Within The Timeframes Specified In The Va Information Security Knowledge Service. f. All Major Information System Changes Which Occur In The Production Environment Shall Be Reviewed By The Va To Determine The Impact On Privacy And Security Of The System. Based On The Review Results, Updates To The Authority To Operate (ato) Documentation And Parameters May Be Required To Remain In Compliance With Va Handbook 6500 And Va Information Security Knowledge Service Requirements. g. The Contractor Shall Conduct An Annual Privacy And Security Self-assessment On All Information Systems And Outsourced Services As Required. Copies Of The Assessment Shall Be Provided To The Cor/co. The Va/government Reserves The Right To Conduct Assessment Using Government Personnel Or A Third-party If Deemed Necessary. The Contractor Shall Correct Or Mitigate Any Weaknesses Discovered During The Assessment. h. Va Prohibits The Installation And Use Of Personally Owned Or Contractor-owned Equipment Or Software On Va Information Systems. If Non-va Owned Equipment Must Be Used To Fulfill The Requirements Of A Contract, It Must Be Stated In The Service Agreement, Sow, Pws, Pd Or Contract. All Security Controls Required For Government Furnished Equipment Must Be Utilized In Va Approved Other Equipment (oe). Configuration Changes To The Contractor Oe, Must Be Funded By The Owner Of The Equipment. All Remote Systems Must Use A Va-approved Antivirus Software And A Personal (host-based Or Enclave Based) Firewall With A Va-approved Configuration. The Contractor Shall Ensure Software On Oe Is Kept Current With All Critical Updates And Patches. Owners Of Approved Oe Are Responsible For Providing And Maintaining The Anti-virus Software And The Firewall On The Non-va Owned Oe. Approved Contractor Oe Will Be Subject To Technical Inspection At Any Time. i. The Contractor Shall Notify The Cor/co Within One Hour Of Disclosure Or Successful Exploits Of Any Vulnerability Which Can Compromise The Confidentiality, Integrity, Or Availability Of The Information Systems. The System Or Effected Component(s) Need(s) To Be Isolated From The Network. A Forensic Analysis Needs To Be Conducted Jointly With Va. Such Issues Will Be Remediated As Quickly As Practicable, But In No Event Longer Than The Timeframe Specified By Va Information Security Knowledge Service. If Sensitive Personal Information Is Compromised Reference Va Handbook 6500.2 And Section 5, Security Incident Investigation. j. For Cases Wherein The Contractor Discovers Material Defects Or Vulnerabilities Impacting Products And Services They Provide To Va, The Contractor Shall Develop And Implement Policies And Procedures For Disclosure To Va, As Well As Remediation. The Contractor Shall, Within 30 Business Days Of Discovery, Document A Summary Of These Vulnerabilities Or Defects. The Documentation Will Include A Description Of The Potential Impact Of Each Vulnerability And Material Defect, Compensating Security Controls, Mitigations, Recommended Corrective Actions, Fbonotice Cause Analysis And/or Workarounds (i.e., Monitoring). Should There Exist Any Backdoors In The Products Or Services They Provide To Va (referring To Methods For Bypassing Computer Authentication), The Contractor Shall Provide the Va Co/co Written Assurance They Have Permanently Remediated These Backdoors. k. All Other Vulnerabilities, Including Those Discovered Through Routine Scans Or Other Assessments, Will Be Remediated Based On Risk, In Accordance With The Remediation Timelines Specified By The Va Information Security Knowledge Service And/or The Applicable Timeframe Mandated By Cybersecurity & Infrastructure Security Agency (cisa) Binding Operational Directive (bod) 22-01 And Bod 19-02 For Internet-accessible Systems. Exceptions To This Paragraph Will Only Be Granted With The Approval Of The Cor/co. 8. Security And Privacy Controls Compliance Testing, Assessment and Auditing. This Entire Section Applies Whenever Section 6 Or 7 Is Included. a. Should Va Request It, The Contractor Shall Provide A Copy Of Their (corporation S, Sole Proprietorship S, Partnership S, Limited Liability Company (llc), Or Other Business Structure Entity S) Policies, Procedures, Evidence And Independent Report Summaries Related To Specified Cybersecurity Frameworks (international Organization For Standardization (iso), Nist Cybersecurity Framework (csf), Etc.). Va Or Its Third-party/partner Designee (if Applicable) Are Further Entitled To Perform Their Own Audits And Security/penetration Tests Of The Contractor S It Or Systems And Controls, To Ascertain Whether The Contractor Is Complying With The Information Security, Network Or System Requirements Mandated In The Agreement Between Va And The Contractor. b. Any Audits Or Tests Of The Contractor Or Third-party Designees/partner Va Elects To Carry Out Will Commence Within 30 Business Days Of Va Notification. Such Audits, Tests And Assessments May Include The Following: (a): Security/penetration Tests Which Both Sides Agree Will Not Unduly Impact Contractor Operations; (b): Interviews With Pertinent Stakeholders And Practitioners; (c): Document Review; And (d): Technical Inspections Of Networks And Systems The Contractor Uses To Destroy, Maintain, Receive, Retain, Or Use Va Information. c. As Part Of These Audits, Tests And Assessments, The Contractor Shall Provide All Information Requested By Va. This Information Includes, But Is Not Limited To, The Following: Equipment Lists, Network Or Infrastructure Diagrams, Relevant Policy Documents, System Logs Or Details On Information Systems Accessing, Transporting, Or Processing Va Data. d. The Contractor And At Its Own Expense, Shall Comply With Any Recommendations Resulting From Va Audits, Inspections And Tests. Va Further Retains The Right To View Any Related Security Reports The Contractor Has Generated As Part Of Its Own Security Assessment. The Contractor Shall Also Notify Va Of The Existence Of Any Such Security Reports Or Other Related Assessments, Upon Completion And Validation. e. Va Appointed Auditors Or Other Government Agency Partners May Be Granted Access To Such Documentation On A Need-to-know Basis And Coordinated Through The Cor/co. The Contractor Shall Comply With Recommendations Which Result From These Regulatory Assessments On The Part Of Va Regulators And Associated Government Agency Partners. 9. Product Integrity, Authenticity, Provenance, Anti-counterfeit And Anti-tampering. This Entire Section Applies When The Acquisition Involves Any Product (application, Hardware, Or Software) Or When Section 6 Or 7 Is Included. a. The Contractor Shall Comply With Code Of Federal Regulations (cfr) Title 15 Part 7, Securing The Information And Communications Technology And Services (icts) Supply Chain , Which Prohibits Icts Transactions From Foreign Adversaries. Icts Transactions Are Defined As Any Acquisition, Importation, Transfer, Installation, Dealing In Or Use Of Any Information And Communications Technology Or Service, Including Ongoing Activities, Such As Managed Services, Data Transmission, Software Updates, Repairs Or The Platforming Or Data Hosting Of Applications For Consumer Download. b. When Contracting Terms Require The Contractor To Procure Equipment, The Contractor Shall Purchase Or Acquire The Equipment From An Original Equipment Manufacturer (oem) Or An Authorized Reseller Of The Oem. The Contractor Shall Attest That Equipment Procured From An Oem Or Authorized Reseller Or Distributor Are Authentic. If Procurement Is Unavailable From An Oem Or Authorized Reseller, The Contractor Shall Submit In Writing, Details Of The Circumstances Prohibiting This From Happening And Procure A Product Waiver From The Va Cor/co. c. All Contractors Shall Establish, Implement, And Provide Documentation For Risk Management Practices For Supply Chain Delivery Of Hardware, Software (to Include Patches) And Firmware Provided Under This Agreement. Documentation Will Include Chain Of Custody Practices, Inventory Management Program, Information Protection Practices, Integrity Management Program For Sub-supplier Provided Components, And Replacement Parts Requests. The Contractor Shall Make Spare Parts Available. All Contractor(s) Shall Specify How Digital Delivery For Procured Products, Including Patches, Will Be Validated And Monitored To Ensure Consistent Delivery. The Contractor Shall Apply Encryption Technology To Protect Procured Products Throughout The Delivery Process. d. If A Contractor Provides Software Or Patches To Va, The Contractor Shall Publish Or Provide A Hash Conforming To The Fips Security Requirements For Cryptographic Modules (fips 140-2 Or Successor). e. The Contractor Shall Provide A Software Bill Of Materials (sbom) For Procured (to Include Licensed Products) And Consist Of A List Of Components And Associated Metadata Which Make Up The Product. Sboms Must Be Generated In One Of The Data Formats Defined In The National Telecommunications And Information Administration (ntia) Report The Minimum Elements For A Software Bill Of Materials (sbom). f. Contractors Shall Use Or Arrange For The Use Of Trusted Channels To Ship Procured Products, Such As U.s. Registered Mail And/or Tamper-evident Packaging For Physical Deliveries. g. Throughout The Delivery Process, The Contractor Shall Demonstrate A Capability For Detecting Unauthorized Access (tampering). h. The Contractor Shall Demonstrate Chain-of-custody Documentation For Procured Products And Require Tamper-evident Packaging For The Delivery Of This Hardware. summary: this Is A Sources Sought Notice And Not A Request For Quotes. This Request Is Solely For The Purpose Of Conducting Market Research To Enhance Vha S Understanding Of The Market S Offered Products, Services, And Capabilities. The Government Will Not Pay Any Costs For Responses Submitted In Response To This Sources Sought. this Sources Sought Notice Provides An Opportunity For Respondents To Submit Their Notice Of Ability, And Their Available Products And Services In Response To The Requirement. Vendors Are Being Invited To Submit Information Relative To Their Potential Of Fulfilling This Requirement In The Form Of A Capability Response That Addresses The Specific Requirement Identified In This Sources Sought. this Sources Sought Is To Facilitate The Contracting Officer S Review Of The Market Base, For Acquisition Planning, Size Determination, And Procurement Strategy. response Commitment: i. Response: all Potential Sources Are Invited To Submit, In Writing, A Capability Statement With Sufficient Information To Substantiate Your Business Is Reasonably Capable Of Performing The Work. The Capability Statement Must Clearly Demonstrate A Business S Ability To Fulfill The Requirement. The Burden Of Proof Rests With The Contractor; Therefore, Written Responses Must Provide Clear And Unambiguous Evidence To Substantiate Capabilities Appropriate To Satisfy This Need. a. Capability Statement With General Understanding Of The Industry And Current Knowledge And Subcontract Networks That Would Be Used To Support The Requirement As Identified Herein. Subcontractors Will Need The Security Requirements Listed In This Sources Sought. Submittals Furnished Will Not Be Returned To The Sender. No Debriefs Will Be Conducted. Eligibility In Participating In A Future Acquisition Does Not Depend Upon A Response To This Notice. responses Shall Provide Administrative Information, And Shall Include The Following As A Minimum: Company Name, Sam Uei Number, Company Mailing Address, Phone Number, Fax Number, Name And Title Of Designated Point Of Contact And E-mail Of Designated Point Of Contact. company Business Size And Status (i.e., Large Business, Small Business, Service-disabled Veteran Owned Small Business, Women-owned Small Business, Etc.), The Number Of Years In Business. b. Proprietary Information Is Neither Requested Nor Desired. If Such Information Is Submitted, It Must Clearly Be Marked "proprietary" On Every Sheet Containing Such Information, And The Proprietary Information Must Be Segregated To The Maximum Extent Practicable From Other Portions Of The Response (e.g., Use An Attachment Or Exhibit). submit Responses Email Only To Karly.gabrysiak@va.gov ii. Timeline: a. This Request Will Close On 01/06/2025 At 8am Est. notes: 1. This Sources Sought Is For Planning Purposes Only, And Does Not Constitute A Commitment, Implied Or Otherwise, That A Procurement Action Will Follow. The Department Of Veterans Affairs Will Use The Information Submitted In Response To This Notice At Its Discretion And Will Not Provide Comments To Any Submission; However, The Department Of Veterans Affairs Reserves The Right To Contact Any Respondent To This Notice For The Sole Purpose Of Enhancing The Department Of Veteran Affairs Understanding Of The Notice Submission. 2. The Content Of Any Responses To This Notice May Be Reflected In Any Subsequent Solicitation, Except For Content Marked Or Designated As Business Confidential Or Proprietary Which Will Be Fully Protected From Release Outside The Government. the Department Of Veteran Affairs Contracting Office Point Of Contact: name: Karly Gabrysiak title: Contract Specialist e-mail Address: Karly.gabrysiak@va.gov

DEPT OF THE NAVY USA Tender

Others
United States
Closing Date2 Jan 2025
Tender AmountRefer Documents 
Details: Contact Information|4|n722.23|b4t|215-697-2008|rachel.m.opperman.civ@us.navy.mil| commercial Product Procurement Notice|5|||||| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo||tbd|n00383|tbd|tbd|tbd|see Schedule|||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| contract Terms And Conditions Required To Implement Statutes Or Executiveorders--commercial Products And Commercial Services (nov 2024))|83|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||| continued: Contract Terms And Conditions Required To Implement Statutes Or Executive Orders--commercial Products And Commercial Services (nov 2024))|15|||||||||||||||| offeror Representations And Certifications--commercial Products And Commercialservices (may 2024))|3|||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|334511|1250||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||| evaluation--commercial Products And Commercial Services (nov 2021)|4||||| all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders And Modifications) Related To The Instant Procurement Areconsidered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To "issue" Contractual Documents Asdetailed Herein. early And Incremental Deliveries Accepted. all Terms And Conditions Are In Accordance With Boa:n0038321gym01 1. Scope 1.1 . Markings Shall Be In Accordance With Mil-std-130. 1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document. 1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.4 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer. 1.5 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By ipc/eiaj-std-001c Paragraph 5.1.4. 2. Applicable Documents - Not Applicable 3. Requirements the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent. responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein. procedures:the Contractor Shall Prepare And Maintain Quality Control documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The performance Spcifications To Perform The Procedures. quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which compliance With Contractual Requirements will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request. purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002). receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings. failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government. nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition. contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification. material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Waiver/deviation Via The Dcmc To The Navicp Contracting Officer. responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items. repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing. records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records: receipt Inspection Documentation. repair Shop Travelers Or Repair Cards. parts Replacement Records. parts Inspection Data Before And After Repair As Applicable. acceptance Test Data. qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request. 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: indicator,attitude ;501-1757-01; P/n, ;014323229; Nsn, ;iaw Applicable Manuals.; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. indicator,attitude ;l3 Aviation Products Inc.; Company Name , ;5353 52nd St Se, Grand Rapids Mi 49512; Address , ;25583; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable

DEPT OF THE NAVY USA Tender

Others
United States
Closing Date6 Jan 2025
Tender AmountRefer Documents 
Details: Contact Information|4|n791.03|lpg|215-697-0288|mackenzie.cannataro.civ@us.navy.mil| commercial Item Procurement Notice - Award|4||||| commercial Product Procurement Notice|5||x|||| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement|8||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo||tbd|n00383|tbd|tbd|see Schedule|tbd||||||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| contract Terms And Conditions Required To Implement Statutes Or Executiveorders--commercial Products And Commercial Services (nov 2024))|83|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||| continued: Contract Terms And Conditions Required To Implement Statutes Or Executive Orders--commercial Products And Commercial Services (nov 2024))|15|||||||||||||||| offeror Representations And Certifications--commercial Products And Commercialservices (may 2024))|3|||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|336413|1250||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x| evaluation--commercial Products And Commercial Services (nov 2021)|4|price|rtat|past Performance|| the Purpose Of This Amendment Is To Incorporate A Picture Of The Item Needing Repair And To Clarify That This Requirement Is For The Repair Of The Entire Seat Assembly. repair Turnaround Time (rtat) Definition: The Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition asset At The Contractor's Facility As Reflected In Theaction Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth Regular Business Day After Receiptand The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. the Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In The Subsequent Contract. required Rtat: 90 Days After Receipt Of Asset throughput Constraint: Contractor Must Provide A Throughput Constraint For Eachnsn(s). Total Assets To Be Repaired Monthly After Initial Delivery Commences X/month (contractor Fill In #). A Throughput Of ##____ Per Month Reflects No Throughput Constraint. induction Expiration Date: 365 Days After Contract Award Date. Any Asset Received After This Date In Days Is Not Authorized For Repair Without Bi-lateral Agreement Between The Contractor And Navsup Wss Contracting Officer. reconciliation:a Reconciliation Modification Will Be Issued After Final Inspection And Acceptance Of All Assets Inducted Under The Subsequent Contract. The Parties Have Agreed To A Price (shown On The Schedule Page) For Each Unit At The Negotiated Rtat. Such prices Are Based On The Contractor Meeting The Rtat Requirements Described Within The Schedule Page. If The Contractor Does Not Meet The Applicable Rtat Requirement, Consideration Will Be Assessed And Subject To Negotiation. all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders, And Modifications) Related To The Instant Procurement Areconsidered To Be "issued" By The Government When Copies Are Either Depositedin The Mail, Transmitted By Facsimile, Or sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To "issue" Contractual Documents Asdetailed Herein. early And Incremental Deliveries Accepted And Preferred. this Requirement Can Only Be Procured From A Supplier Who Provides Faa-certified Parts Which Possess A Faa Authorized Release Certificate, Faa Form 8130-3 Airworthy Approval Tag, From Certified Repair Stations Pursuant To 14 Cfr Part 14. this Solicitation Will Be Using Competitive Procedures. this Requirement Will Be Awarded To The Offeror With The Lowest Price Technically Acceptable (lpta) Submitted Via Quote. quotes May Be Emailed To The Below Email Address And Must Be Received By 4:30pm Est On The Closing Date, Listed In Block 10 On Page 1 Of This Solicitation. offers Received After The Closing Date Are Considered To Be Late And Will Not Be Considered For Award. the Government Intends To Make A Single Award To The Eligible, Responsible, Technically Acceptable And Responsible Offeror Whose Offer, Conforming To The Solicitation, Represents Best Value To The Government. The Offeror's Proposal Shall Be In The Form Prescribed By, And Shall Contain A Response To Each Of The Areas Identified In The Section L Solicitation Provision Entitled "submission Of Offers For Lowest Priced, Technically Acceptable Offers". Only Those Proposals Prepared In Accordance With The Solicitation Will Be E evaluated. Award Will Be Made On The Basis Of The Lowest Evaluated Price Of Proposals Meeting Or Exceeding Administrative Costs, It Is In The Government's Best Interest To Do So. The Government Will First Evaluate The Non-price Go/no Go Factors. The Non-price evaluation Factor Is Past Performance. The Non-price Factors Will Be Rated As Either Acceptable Or Unacceptable Based On The Solicitation Criteria. The Contractor Must Achieve An Acceptable Rating In Past Performance Or It Will Be Removed From Competition. this Requirement Is A 100 Percent Small Business Set Aside. \ 1. Scope 1.1 . Markings Shall Be In Accordance With Mil-std-130. 1.2 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;ipeco Holdings Limited; Drawing Number ( ;k9075; ) ;3a296-0007-21-1; , Revision ;latest; And All Details And Specifications Referenced Therein. 1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.4 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c. 2. Applicable Documents - Not Applicable 3. Requirements 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: seat,aircraft ;3a296-0007-21-1; P/n, ;7rh 1680 998899408 P8; Nsn, ;available Repair Manuals, Drawings And Specifications Per P/n Requirements; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. seat,aircraft ;ipeco Holdings Limited; Company Name , ;essex Ss2 6un United Kingdom; Address , ;k9075; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable

MUNICIPALITY OF LANTAPAN Tender

Others
Philippines
Closing Date2 Jan 2025
Tender AmountPHP 1.7 Million (USD 29.7 K)
Details: Description Republic Of The Philippines Province Of Bukidnon Municipality Of Lantapan Invitation To Bid For Procurement Of Office Supplies For All Offices Of Lgu-lantapan (1st Bid) 1. The Local Government Unit Of Lantapan, Through The General Fund Intends To Apply The Sum Of One Million Seven Hundred Twenty-one Thousand Seven Hundred Eight Pesos (php 1,721,708.00) Being The Abc To Payments Under The Contract Procurement Of Office Supplies For All Offices Of Lgu-lantapan Ib # 2024-12-079 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Local Government Unit Of Lantapan Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Required Is 20 Calendar Days. Bidders Should Have Completed, From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The 2016 Revised Irr Of Ra No. 9184. 4. Prospective Bidders May Obtain Further Information From The Local Government Unit Of Lantapan And Inspect The Bidding Documents At The Address Given Below During Mondays To Fridays From 8:00 A.m. To 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 11, 2024 To January 2, 2025 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (php 5,000.00). The Procuring Entity Shall Allow The Bidder To Present Personally Its Proof Of Payment For The Fees. [note: For Lot Procurement, The Maximum Fee For The Bidding Documents For Each Lot Shall Be Based On Its Abc, In Accordance With The Guidelines Issued By The Gppb; Provided That The Total Fees For The Bidding Documents Of All Lots Shall Not Exceed The Maximum Fee Prescribed In The Guidelines For The Sum Of The Abc Of All Lots.] 6. The Local Government Unit Of Lantapan Will Hold A Pre-bid Conference On December 17, 2024 At Municipal Conference Room Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Bac Office 2nd Floor, Municipal Conference Room, Municipal Hall, Poblacion, Lantapan, Bukidnon, On Or Before 8:45 A.m (philippine Standard Time) On January 2, 2025. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 2, 2025 At 9:00 O’clock A.m At The Given Address Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. [insert Such Other Necessary Information Deemed Relevant By The Procuring Entity Such As The Use Of A Back-up Data Or Cloud Storage For Large Files Uploaded For Online Bid Submissions] 11. The Local Government Unit Of Lantapan Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Jefer Mae B. Macana Bac Secretariat Bac Office, 2/f Municipal Hall Purok 6, Poblacion, Lantapan Bukidnon, Philippines Email Add: Lant.bacsec2024@gmail.com 13. You May Visit The Following Website/s: Lantapan.gov.ph For Downloading Of Bidding Documents: Www.philgeps.gov.ph Date Of Issue: December 11, 2024 Engr. Jessell S. Pacturan, C.e. Bac Chairperson Reference No.: Ib # 2024-12-079 Name Of Project: Procurement Of Office Supplies For All Offices Of Lgu-lantapan Location Of Delivery: Lgu-lantapan, Bukidnon Abc: Php 1,721,708.00 Item No. Item Description Unit Of Issue Quantity Abc Unit Price Amount 1 Air Freshner Can 41 7,380.00 2 Albatross Pcs 81 3,240.00 3 Alcohol 500ml Bot 202 20,200.00 4 Alcohol Gal 17 9,350.00 5 A4tech Anti-glare Webcam Pk635g Pcs 1 3,000.00 6 Ballpen Pilot Black Pcs 322 11,270.00 7 Ballpen Pilot Blue Pcs 30 1,050.00 8 Ballpen Faber Castel Red Pcs 92 1,472.00 9 Ballpen Black Ordinary Pcs 591 5,910.00 10 Book Paper A4 Rms 455 109,200.00 11 Book Paper Short Rms 158 34,760.00 12 Book Paper Long Rms 688 172,000.00 13 Book Paper Long 80gsm Rms 5 1,400.00 14 Brown Envelope Long Pcs 959 6,713.00 15 Brown Envelope Short Pcs 311 1,866.00 16 Battery Double Aa Pack 42 3,570.00 17 Battery Triple Aaa Pack 25 2,125.00 18 Baygon Insect Killer Can 54 9,720.00 19 Book Paper Short 80 Gsm Rsms 5 1,250.00 20 Book Paper A4 80gsm Rms 25 6,500.00 21 Brother Ink Btd 60 Black Bot 63 25,200.00 Item No. Item Description Unit Of Issue Quantity Abc Unit Price Amount 22 Brother Ink 5000 Magenta Bot 32 12,800.00 23 Brother Ink 5000 Cyan Bot 32 12,800.00 24 Brother Ink 5000 Yellow Bot 32 12,800.00 25 Binder Clip Small Bx 99 3,465.00 26 Binder Clip Big Bx 96 5,760.00 27 Bath Soap Pc 4 160.00 28 Bar Soap (long Bar) Bar 30 1,200.00 29 Battery Rechargeable Double Aa Pc 5 1,250.00 30 Ballpen Fiber Castel Black Pc 529 8,464.00 31 Broom Stick Pc 29 1,015.00 32 Battery Eneloop Rechargeable Aa Pc 10 3,500.00 33 Ballpen Blue Pc 10 100.00 34 Battery 12v 5ah (for Ups) Pc 10 18,000.00 35 Columnar Notebook 12 Cols Pc 23 1,265.00 36 Cartolina Green Pc 12 120.00 37 Computer Mouse Wrieless Pc 9 3,150.00 38 Cannon Ink 810 Black Pc 4 8,600.00 39 Cannon Ink 811 Colored Pc 2 4,700.00 40 Clear Folder A4 Pc 26 416.00 41 Clear Folder Long Pc 136 2,448.00 42 Clear Folder Short Pc 32 512.00 43 Correction Tape Pcs 235 8,225.00 44 Correction Pen Pcs 16 1,760.00 45 Cartolina Pc 25 250.00 Item No. Item Description Unit Of Issue Quantity Abc Unit Price Amount 46 Computer Keyboard Usb Type Pc 16 5,600.00 47 Computer Mouse Usb Type Bot 17 5,100.00 48 Construction Paper Rm 8 2,800.00 49 Columnar Notebook 24 Cols. Pc 77 6,545.00 50 Cork Board Pc 7 5,320.00 51 Computer Mouse Pad Bot 11 1,650.00 52 Certificate Holder Short Pc 25 2,250.00 53 Certificate Holder Long Pc 44 4,400.00 54 Calculator Ordinary Bot 15 11,250.00 55 Calculator Scienttific Bot 1 1,250.00 56 Cutter Big Pc 13 585.00 57 Cutter Small Pc 3 75.00 58 Carbon Paper Plastofoil Long Black Pc 3 2,940.00 59 Continuos Paper Short 2 Ply Pc 24 54,000.00 60 Clear Envelope Long With Handle Pc 25 625.00 61 Cutter Blade Pc 1 25.00 62 Dtr Pc 12731 12,731.00 63 Dishawshing Liquid/paste Pc 112 6,720.00 64 Downy Bot 19 4,275.00 65 Dipper Big Pc 4 240.00 66 Data Filer Small With Cover Bot 2 700.00 67 Data Filer Big With Cover Pcs 215 81,700.00 68 Data Filer Big Without Cover Pc 25 7,500.00 69 Duct Tape Pc 39 2,730.00 Item No. Item Description Unit Of Issue Quantity Abc Unit Price Amount 70 Dust Pan Pc 17 1,105.00 71 Dishwashi Ng Sponge Pc 28 560.00 72 Double Sided Tape Roll 65 9,750.00 73 Data Folder Hard 76mmx230mmx380mm Pack 15 2,925.00 74 External Hard Drive 1tb Pc 5 12,500.00 75 Epson Ink 003 Black Pc 174 69,600.00 76 Epson Ink 003 Magenta Pc 79 31,600.00 77 Epson Ink 003 Cyan Pc 78 31,200.00 78 Epson Ink 003 Yellow Pc 78 31,200.00 79 Expanded Brown Envelope Long Pcs 816 14,688.00 80 Expanded Folder Long Pc 429 7,722.00 81 Electric Fan Pc 2 5,000.00 82 Elmers Glue 118 Ml Bot 45 2,520.00 83 Epson Ink T6641 Black Bot 49 19,600.00 84 Epson Ink T6642 Magenta Bot 17 6,800.00 85 Epson Ink T6643 Cyan Bit 17 6,800.00 86 Epson Ink T6644 Yellow Bot 22 8,800.00 87 Expanded Folder Long Yellow Pcs 350 6,300.00 88 Expanded Folder Long Blue Pcs 480 8,640.00 89 Folder Long Blue Pcs 30 210.00 90 Folder Long White Pcs 910 6,370.00 91 Folder Short White Pcs 81 486.00 92 Feather Duster Pc 16 1,040.00 93 Filing Tray 3 Layers Pc 8 6,000.00 Item No. Item Description Unit Of Issue Quantity Abc Unit Price Amount 94 Frame A4 Pcs 23 3,450.00 95 Ballpen Faber Castel Blue Pcs 15 240.00 96 Cotton Balls Pack 5 500.00 97 Glass Cleaner Bot 44 7,700.00 98 Halk White Enamel 100 Pcs /bx Bx 6 300.00 99 Garbage Basket Ordinary Big Pcs 18 4,500.00 100 Garbage Basket Pedal Type Pc 6 2,100.00 101 Garbage Bag Large Pack 4 600.00 102 Glass Window Wifer Pc 4 1,400.00 103 Gun Tucker Wire Arrow Jt21 Bx 4 720.00 104 Gun Tucker Jt21 Pc 3 6,750.00 105 Heavy Duty Cellophane With Handle Pc 200 7,000.00 106 Highlighter(stabilo Boss) Pc 164 7,380.00 107 Hp Ink 678 Black Pc 15 10,500.00 108 Hp Ink 678 Colored Pc 10 7,000.00 109 Hand Liquid Soap Pc 25 3,125.00 110 Hd-12n /24 Clincher Pc 1 2,000.00 111 Id Sling Pc 60 900.00 112 Id Jacket Pc 60 1,200.00 113 Index Tab Pc 14 3,500.00 114 Linen Paper Long Ordinary Pack 2 110.00 115 Linen Paper Short Ordinary Pack 135 7,020.00 116 Linen Paper Long Board Pc 11 660.00 117 Linen Paper Short Board Pc 355 19,525.00 Item No. Item Description Unit Of Issue Quantity Abc Unit Price Amount 118 Lysol Spray Pc 10 7,500.00 119 Linen Paper Short Blue Pack 10 520.00 120 Memeo Ppaer Long Pc 3 600.00 121 Memeo Paper Short Pc 2 360.00 122 Mop Head Pc 13 1,950.00 123 Mop Head With Handle Pc 23 8,050.00 124 Mounting Tape Roll 28 7,000.00 125 Masking Tape 1" Pc 31 1,860.00 126 ,masking Tape 2" Roll 49 3,430.00 127 Mannual Binding Machine Pc 1 5,000.00 128 Mailing Envelope Long White Bx 12 3,600.00 129 Manila Paper Pc 160 1,600.00 130 Muriatic Acid Gal 11 3,850.00 131 Notebook Pc 34 680.00 132 Official Record Book 500pp Pc 25 4,500.00 133 Paper Clip Small Bx 71 3,195.00 134 Paper Clip Jumbo Bx 76 3,800.00 135 Paper Fastener Plastic Pc 32 1,600.00 136 Paper Fastener Metal Bx 26 3,120.00 137 Pencil Pc 193 1,930.00 138 Paper Sharpener Small Gal 6 120.00 139 Post It Note Pad 744 33,480.00 140 Pentel Pen Fineblack Pc 87 4,350.00 141 Pentel Pen Black Broad Pc 82 4,100.00 Item No. Item Description Unit Of Issue Quantity Abc Unit Price Amount 142 Pentel Pen Blue Pc 5 250.00 143 Pentel Pen Red Pc 1 50.00 144 Pentel Pen Green Pc 5 250.00 145 Pail Big Pc 6 2,400.00 146 Push Pin Pack 33 1,155.00 147 Puncher Pc 14 2,520.00 148 Powder Soap Kls 99 14,850.00 149 Paper Cutter Big Pc 3 7,500.00 150 Photo Paper A4 Pad 65 6,500.00 151 Pvc Cover A4 Bx 1 990.00 152 Packaging Tape 2" Roll 13 975.00 153 Pledge Furniture Polisher Can 9 1,620.00 154 Paper Towel Interfold Pad 19 2,850.00 155 Pvc Cover Long Bx 1 1,100.00 156 Plastic Spiral Coil Binder Plastic Ring A4 32mm Pc 2 300.00 157 Plasric Spiral Coil Binder Plastic Ring A4 25mm Pc 2 400.00 158 Plastic Spiral Ring Long Bx 1 250.00 159 Plastic Spiral Ring Short Bx 1 250.00 160 Philippinea Flag 3 X 5 Pcs 50 20,000.00 161 Philippine Flag 4 X 8 Pcs 10 7,500.00 162 Rain Coat Single Whole Pc 2 1,200.00 163 Rubber Boots Pair 1 750.00 164 Rubber Eareser Bx 1 15.00 165 Ribbon Lq 310- Cartridge Pc 6 1,500.00 Item No. Item Description Unit Of Issue Quantity Abc Unit Price Amount 166 Ring Binder 1/4 Pc 3 180.00 167 Ring Binder 1/2 Pc 8 680.00 168 Ring Binder 1 Pc 6 600.00 169 Ring Binder 2 Pc 6 720.00 170 Rer Pad 10 500.00 171 Rug Pc 24 2,400.00 172 Ruler Pc 32 320.00 173 Record Book 300 Pp Pc 55 4,950.00 174 Record Book 500pp Pc 21 2,310.00 175 Rubber Band No. 18 Bx 3 1,050.00 176 Rubber Bnd Hd 350 Gsm Bx 5 2,000.00 177 Rice Cooker Pc 2 5,000.00 178 Rain Coat With Pants Set 3 4,500.00 179 Stamp-certified True Copy Pc 2 300.00 180 Stamp Released Pc 2 300.00 181 Stamp Received Pc 1 150.00 182 Sticker Paper A4 Pack 34 4,080.00 183 Scoth Tape 1' Roll 118 5,900.00 184 Scoth Tape 2' Roll 102 7,650.00 185 Scoth Brite Pc 44 2,640.00 186 Steel Wall Pc 5 300.00 187 Sign Pen Black Pc 900 27,000.00 188 Sign Pen Pilot Black Pc 56 8,400.00 189 Scissor Big Pcs 54 3,510.00 Item No. Item Description Unit Of Issue Quantity Abc Unit Price Amount 190 Soft Broom Pc 46 5,520.00 191 Staple Wire Hd-3ls 10mm Bx 14 1,680.00 192 Stapler With Remover Pc 39 17,940.00 193 Stamp Pad Inlk Purple Bx 33 1,485.00 194 Stamp Pad Ink Black Pc 8 360.00 195 Storage Box 50 Ltrs Pc 4 7,200.00 196 Spin Mop Pc 12 15,000.00 197 Spoon Doz 2 200.00 198 Sign Pen Black Uni Ball Impact Pc 211 33,760.00 199 Steel Map Pc 1 1,500.00 200 Stamp Pad Pc 15 900.00 201 Sign Pen Blue Pc 5 150.00 202 Stapler Swingline Big Hd Pc 4 3,000.00 203 Stick Glue Pc 46 460.00 204 Stapler Hd21-(23/17/120 Sheets) Pc 2 5,000.00 205 Staple Remover Pc 8 1,200.00 206 Staple Wire 35 Bx 135 6,075.00 207 Sign Pen Green Pc 6 180.00 208 Specialty Paper Vellum Board 180gsm Pack 50 3,250.00 209 Stapler Wioth Remover Hd Pc 9 4,140.00 210 Tissue Paper Doz 90 13,500.00 211 Thick Plastic Folder Long Pc 265 6,625.00 212 Tape Despenser Pc 9 1,620.00 213 Toilet Bowl Brush Pc 13 1,950.00 Item No. Item Description Unit Of Issue Quantity Abc Unit Price Amount 214 Tape Measure 100 Mtrs. Pc 1 600.00 215 Ups Pc 3 7,500.00 216 Usb 64 Gig Pc 3 2,400.00 217 Usb 8 Gig Pc 14 5,600.00 218 Usb 16 Gig Pc 7 3,500.00 219 Usb 32gig Pc 5 3,500.00 220 Whyte Board Pen Black Pc 39 1,950.00 221 White Board 4 X8 Pc 5 15,000.00 222 White Board Eareser Pc 7 455.00 223 Working Gloves Pair 3 450.00 224 Wet Wipes Pack 12 1,200.00 225 Wall Clock Pc 2 1,160.00 226 Yellow Pad Pad 8 320.00 227 Zonrox Gal 40 8,000.00 228 Coconut Scub Pcs 6 360.00 229 Dishwashing Liquid Bot 5 375.00 230 Floor Wax White Can 3 1,260.00 231 Zonrox Color Safe Gal 10 2,000.00 232 Table Shar Pener Pc 1 500.00 233 Toilet Pump Pc 6 780.00 234 Sliding Folder White Long Pc 60 1,500.00 235 Plastic Cellophe Cover Thick Mtrs 20 1,700.00 236 Linen Paper Short Light Blue Pack 20 1,200.00 237 Linen Paper Light Green Pack 65 3,900.00 Item No. Item Description Unit Of Issue Quantity Abc Unit Price Amount 238 Cloth Geena Earth Mint Green Mtrs 50 2,250.00 239 Medal Ordinary B-l-g Pcs 3000 90,000.00 Total Bid Price In Figure: Total Bid Price In Words: Prepared And Submitted By:

DEPT OF THE NAVY USA Tender

Scraps
United States
Closing Date9 Jan 2025
Tender AmountRefer Documents 
Description: Contact Information|4|n743.49|wvm|7176052147|benjamin.t.spangler.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.| inspection Of Supplies--fixed-price (aug 1996)|2||| time Of Delivery (june 1997)|20|0001aa|25|365|0001ab|lot|see Dd1423|0001ac|1|150|||||||||||| stop-work Order (aug 1989)|1|| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|n/a|n/a|n39040 - Certifications |n/a |n/a|see Dd Form 1423 |port_ptnh_wawf_notification@navy.mil Benjamin.t.spangler.civ@us.navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| value Engineering (jun 2020)|3|||| equal Opportunity (sep 2016)|2||| integrity Of Unit Prices (nov 2021)|1|| equal Opportunity For Veterans (jun 2020)|4||||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.||||| warranty Of Data--basic (mar 2014)|2||| small Business Subcontracting Plan (sep 2023)|4||||| equal Opportunity For Workers With Disabilities (jun 2020)|2||| transportation Of Supplies By Sea (oct 2024)|2||| first Article Approval--government Testing (sep 1989)|7|1|0001ac|150|receiving Officer Portsmouth Naval Shipyard, Building 240, Code 240. (207-438-5445) Kittery, Me 03904-5000|30|x|| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| progress Payments (nov 2021)|4||||| list Of Award Attachments|5|||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|13|335931|600|||||||||||| cost Accounting Standards Notices And Certification (deviation 2018-o0015)(may 2018))|1|| instructions To Offerors -- Competitive Acquisition (nov 2021)|2||| type Of Contract (apr 1984)|1|firm Fixed| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|x|| evaluation Of First Article Testing|3|x|$42,000|| this Amendment Is Issued To Update Solicitation Clauses. this Requirement Is Not A Small Business Set-aside And Is Full And Open. \ ---this Requirement Is Not A Small Business Set-aside.--- 1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already Onfile At Navsup Wss Mechanicsburg. 2. Portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference Ton00102 Within This Order Should Be Updated To N50286. 3. The Following Proposed Delivery Schedule Applies: submission Of Certification Data Cdrls Will Be On Or Before 20 Days Prior To Scheduled Delivery. weld Procedure And Qual Data 120 Days Adc Lt approval Of Weld Procedures And Qual Data 60 Days After Receipt fat Report 150 Days After Approval Of Pr Lt approval Of Fat Report 30 Days After Receipt Pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt Of Certification Dd 1423 Cdrls. Final Delivery Of Material Will Be On Or Before 365 Days After Effective Date Of The Resulting Contract. 4. Any Contract Awarded As A Result Of This Solicitation Will Be "dx" Rated Order; "dx" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas). 5. Navsup Wss Mechanicsburg Will Be Considering Past Performance In The Evaluation Of Offers In Accordance With Far 13.106(a)(2) And Dfars 252.213-7000. 6. If Drawings Are Included In The Solicitation, Access Needs To Be Requested On The Individual Solicitation Page On Contracts Opportunities On The Government's Beta.sam Website. After Requesting Access, Send An Email To The Primary Poc Listed On The Solicitation. 7. This Solicitation Requires First Article Testing. Far 52.290-4 First Article Approval - Government Testing For More Details. 8. The Complete Rfp Package Must Be Signed And Returned Prior To The Closing Date. Emailed Or Faxed Proposals Are Acceptable. Neco Quotes Will Not Be Accepted And Will Be Determined Non-responsive. \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. drawing Data=1197258 |53711| C| |d|0001 | C|49998|0876328 document Ref Data=fed-std-h28 | | |b |190424|a| | | document Ref Data=fed-std-h28 |0020| |b |941221|a| |01| document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=qq-n-281 | | |d |851023|a| 2| | document Ref Data=qq-n-286 | | |g |001207|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=mil-std-2035 | | |a |950515|a| | | document Ref Data=mil-std-2132 | | |d |080211|f| |01| document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-dtl-24231 | | |e |130426|a| | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=a-a-59004 | | |b |181118|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=0900-lp-001-7000 | | | |810101|c| |01| document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | | 3. Requirements 3.1 ;the Electrical Hull Fitting And Transmitter Cable Assembly For The An/bst-1 Must Be In Accordance With Naval Ship Engineering Center Drawing 803-1197258, Except As Amplified Or Modified Herein.; 3.2 ;ls2swu-12 Cable Is To Be Used In Lieu Of Ls2swua-12 Cable.; 3.3 First Article Approval (government Testing) - First Article Test (fat) And Approval Is Required. 3.4 ;the First Article Test (fat) Sample(s) Must Not Be Delivered Against The Contract Quantity.; 3.5 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;receptacle Body, Item 14; material - ;qq-n-281, Class A; part - ;hull Fitting Body, Item 2; Body Cover, Item 3; Washer, Item 4; And Nut, Item 5; material - ;qq-n-286, Form 2, Cold Drawn Or Hot Finished, Annealed And Age Hardened And Must Meet The Mechanical Requirements Cited In Note 2.h Of Drawing 803-1197258 Except The Brinell Hardness Minimum Is 250 Instead Of 265 As Listed In Note 2.h; 3.6 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below. test - Quality Conformance/compliance Inspection item - ;each Electrical Hull Fitting Assembly; performance - ;mil-dtl-24231, Table I For Type Iv And Note 22 On Drawing 803-1197258; acceptance - ;mil-dtl-24231; test - ;dye Penetrant Inspection; item - ;hull Fitting Body, Item 2; Body Cover, Item 3; Washer, Item 4; And Nut, Item 5; performance - T9074-as-gib-010/271 acceptance - Mil-std-2035 test - Ultrasonic Inspection On Starting Material item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract; performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286 acceptance - Qq-n-286 attribute - Annealing And Age Hardening item - ;hull Fitting Body, Item 2; Body Cover, Item 3; Washer, Item 4; And Nut, Item 5; performance - Qq-n-286 test - 5x Visual Magnification Or Dye Penetrant Inspection (root Layer) item - Weldments performance - T9074-as-gib-010/271 acceptance - Mil-std-2035 test - Visual And Dye Penetrant Inspection (final Layer) item - Weldments performance - T9074-as-gib-010/271 acceptance - Mil-std-2035 test - Non-destructive Tests item - ;weld Repair (as Applicable); performance - Per Applicable Fabrication Specification acceptance - Per Applicable Fabrication Specification 3.7 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes. 3.8 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories: huntington Alloys, A Special Metals Company attn: Bill Bolenr 3200 Riverside Drive huntington, Wv 257059 phone: (304) 526-5889 fax: (304) 526-5973 metallurgical Consultants, Inc. attn: W. M. Buehler 4820 Caroline po Box 88046 houston, Tx 77288-0046 phone: (713) 526-6351 fax: (713) 526-2964 naval Surface Warfare Center, Carderock Division attn: Eric Focht Code 614 9500 Macarthur Blvd west Bethesda, Md 20817-5700 phone: (301) 227-5032 fax: (301) 227-5576 teledyne Allvac attn: Dr. W. D. Cao 2020 Ashcraft Ave. monroe, Nc 28110 phone: (704) 289-4511 fax: (704) 289-4269 westmoreland Mechanical Testing And Research Inc. attn: Andrew Wisniewski p.o. Box 388 youngstown, Pa 15696-0388 mannesmann Rohrenwerke mannesmann Forschungsinstitut (mfi) attn: Dr. Weiss postfach 251160 47251 Duisburg germany phone: 011-49-0203-9993194 fax: 011-49-0203-9994415 thyssenkrupp Vdm Usa, Inc. attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 houston, Tx 77065-4939 phone: (281) 955-6683 3.9 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. 3.10 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent inspection In Accordance With Asme B1 Series Is Acceptable. 3.10.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement. 3.10.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222. 3.10.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System. 3.11 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly. 3.12 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable. 3.13 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/ 3.14 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not permitted On ;qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing. 3.15 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.15.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.15.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.15.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.16 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.17 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.17.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. ^ Quality Assurance Requirements ^ 3.18 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.19 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor. note: These Requirements Do Not Apply To Tack/spot Welds. 3.19.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair). 3.19.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted, citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.") 3.19.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And the Contract. 3.19.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application. 3.19.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual agreement Between The Vendor And Dcma. 3.19.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted as Part Of The Qualification Data. 3.19.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element. 3.19.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278. 3.19.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval. 3.19.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. 3.19.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following: a) Filler Metal Lot Number(s) b) Specification And Type c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements. d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption. 3.19.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor. 3.20 First Article Test/inspection (government) - ;destructive; - The Contractor Shall Deliver ;one (1); Unit(s) To ;receiving Officer Portsmouth Naval Shipyard, Building 240, Code 240. (207-438-5445) Kittery, Me 03904-5000; For First Article Tests In Accordance With The ;requirements Of Mil-dtl-24231, Table I For Type Iv And Note 21 On Drawing 803-1197258; . 3.21 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.21.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.21.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.21.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.21.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.21.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.22 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.22.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.22.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.23 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.23.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.23.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.23.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.23.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.23.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.24 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.24.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.24.2 Inspection For Completeness And Proper Type. 3.24.3 Verification Of Material Quality Received. 3.24.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.24.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.24.6 Identification And Protection From Improper Use Or Disposition. 3.24.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.24.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.24.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.25 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.25.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order. 3.26 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.26.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.26.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And the Tag Securely Affixed To The Material. 3.26.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part number, Piece Number, Traceability Number, And The Location Of The Permanent Mark. 3.26.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ; 3.27 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.27.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The material Supplied. 3.27.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.27.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.27.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.27.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.28 Material Handling - The Written Material Control Process Must Include The Following: 3.28.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.28.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.28.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.28.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors. 3.28.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.28.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.29 Receiving Inspection - 3.29.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.29.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.30 Discrepancy Reporting - 3.30.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.31 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.31.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.31.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.31.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.31.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.32 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification. 6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order. ;- 10/20/2016 - Updated Ecds Url - Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed - Oct 29 2010 - Added Sampling Std For Li In-process Testing - Jun 28 2012 - Updated Ut Of Qq-n-286 Bar 4" And Over - Sep 30 2008 - Thread Inspection Requirements Were Clarified - Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds - Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe - Dec 17 2011 - Moved Quality Assurance Text Location For Readability - Apr 22 2009 - Added Evidence Of Dcma Observing Test Plate Welding & Ndt - Mar 18 2008 - Identify Applicable Weld Joints With Weld Procedures - Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes - Jan 19 2011 - Added Notification Of Dcma Upon Contract Award - May 02 2009 - Added Lubricants And Sealants To The C Of C - Aug 27 2014 - Took Out Contractor's Phone Number Requirement - Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section - Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section; date Of First Submission=asreq paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding. this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt. date Of First Submission=asreq block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding. this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 12 - See Clause 52.209-3 For Submittal Timeframes.
6001-6010 of 6010 archived Tenders