Led Tenders
Led Tenders
Department Of Public Works And Highways Tender
Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Philippines
Details: Description Invitation To Bid December 5, 2024 1. The Dpwh–biliran District Engineering Office, Through Gaa Fy-2025, Intends To Apply The Sum Of The Approved Budget For The Contract (abc) Stated Below Being The Abc To Payments Under The Contracts Below. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Bid Opening And Declared Non-complying/failed. 2. The Dpwh–biliran District Engineering Office, Through Its Bids And Awards Committee (bac) Now Invites Bids For The Hereunder Works Of The Following Contract/s: 1. Procurement Id/contract Id : 25ia0104 Contract Name : Installation/application Of Road Safety Facilities - Naval-caibiran Cross Country Rd - K1027+000 - K1031+530 Contract Location : Naval, Biliran (11.565233°, 124.404044°- 11.578701°, 124.441236°) Project Description/scope Of Work : Installation Of 181 Units Of Solar Street Lights Approved Budget For The Contract : P 29,398,224.41 Contract Duration : 130.00 C.d. Cost Of Bidding Documents : P 25,000.00 2. Procurement Id/contract Id : 25ia0105 Contract Name : Construction Of Access Roads Leading To Declared Tourism Destinations - Access Road Leading To Subing Subing Hill, Kawayan, Biliran Contract Location : Brgy. Balacson, Kawayan, Biliran 11.669727, 124.344403 - 11.671273, 124.343774 (location 1) 11.675592, 124.343897 - 11.676395, 124.343767 (location 2) Project Description/scope Of Work : Construction Of 0.746 Lane Kilometer Road, 0.23m Thick & 6.10m Width With Embankment, Drainage, And Slope Protection Structure Approved Budget For The Contract : P 19,598,031.50 Contract Duration : 160.00 Cd Cost Of Bidding Documents : P 25,000.00 3. Procurement Id/contract Id : 25ia0106 Contract Name : Construction Of Drainage, Barangay Calumpang, Naval, Biliran Contract Location : Brgy. Calumpang, Naval, Biliran Location 1 - (11.568507°, 124.412067° - 11.570055°, 124.41164°) Location 2 - (11.569489°, 124.411632° - 11.569495°, 124.41162°) Project Description/scope Of Work : Construction Of 616.70 Ln.m Open Drainage (lined Canal) W/ Metal Frames And Gratings Approved Budget For The Contract : P 4,948,200.18 Contract Duration : 85.00 C.d. Cost Of Bidding Documents : P 5,000.00 Page 2 Of 4 4. Procurement Id/contract Id : 25ia0107 Contract Name : Construction Of Seawall, Barangay Mabini, Naval, Biliran Contract Location : Brgy. Mabini, Naval, Biliran (11.564381°, 124.275058° - 11.564806°, 124.274625°) Project Description/scope Of Work : Construction Of 93.20 Ln.m. Seawall Structure With Reinforced Concrete Facing Approved Budget For The Contract : P 9,898,256.03 Contract Duration : 165.00 C.d. Cost Of Bidding Documents : P 10,000.00 5. Procurement Id/contract Id : 25ia0108 Contract Name : Construction Of Bagongbong Flood Control, Barangay Salangi, Almeria, Biliran Contract Location : Almeria, Biliran (124.394165°, 11.621246° - 124.394360°, 11.623738°) Project Description/scope Of Work : Construction Of 334.00 Ln.m. Flood Control Structure Approved Budget For The Contract : P 19,598,391.73 Contract Duration : 143.00 C.d. Cost Of Bidding Documents : P 25,000.00 6. Procurement Id/contract Id : 25ia0109 Contract Name : Construction Of Flood Control Structure, Barangay Casiawan, Cabucgayan, Biliran Contract Location : Cabucgayan, Biliran (124.573765°, 11.484283° - 124.575893°, 11.486335°) Project Description/scope Of Work : Construction Of 424.00 Ln.m. Flood Control Structure Approved Budget For The Contract : P 19,598,372.48 Contract Duration : 143.00 C.d. Cost Of Bidding Documents : P 25,000.00 7. Procurement Id/contract Id : 25ia0110 Contract Name : Construction Two-storey Office Building, Dpwh Biliran Deo, Bureau Of Equipment, 8th Res, Barangay Larrazabal, Naval, Biliran Contract Location : Brgy. Larrazabal, Naval, Biliran (11.583267, 124.409843 & 11.58306, 124.409215) Project Description/scope Of Work : Construction Of 2-storey Building Approved Budget For The Contract : P 48,998,346.17 Contract Duration : 250.00 C.d. Cost Of Bidding Documents : P 25,000.00 8. Procurement Id/contract Id : 25ia0111 Contract Name : Construction Of Multi-purpose Building, Barangay Matanggo, Almeria, Biliran Contract Location : Barangay Matanggo, Almeria, Biliran (11.647594, 124.124.368010) Project Description/scope Of Work : Construction Of 1-storey Building Approved Budget For The Contract : P 4,948,276.36 Contract Duration : 140.00 C.d. Cost Of Bidding Documents : P 5,000.00 9. Procurement Id/contract Id : 25ia0112 Contract Name : Construction Of Multi-purpose Building,barangay, P.i. Garcia, Naval, Biliran Contract Location : Brgy. P.i. Garcia, Naval, Biliran (11.563721, 124.395253) Project Description/scope Of Work : Construction Of 2-storey Building Approved Budget For The Contract : P 4,898,328.55 Contract Duration : 180.00 C.d. Cost Of Bidding Documents : P 5,000.00 Page 3 Of 4 10. Procurement Id/contract Id : 25ia0113 Contract Name : Construction (completion) Of Multi-purpose Building, Barangay Pulang Bato, Almeria, Biliran Contract Location : Barangay Pulang Bato, Almeria, Biliran (11.600953, 124.390656) Project Description/scope Of Work : Construction Of 1-storey Building Approved Budget For The Contract : P 4,948,276.06 Contract Duration : 140.00 C.d. Cost Of Bidding Documents : P 5,000.00 11. Procurement Id/contract Id : 25ia0114 Contract Name : Construction Of Multi-purpose Building, Barangay Union, Caibiran, Biliran Contract Location : Brgy.union, Caibiran, Biliran (11.56519194⁰, 124.55213936⁰) Project Description/scope Of Work : Construction Of 1-storey Building Approved Budget For The Contract : P 4,948,219.25 Contract Duration : 125.00 C.d. Cost Of Bidding Documents : P 5,000.00 12. Procurement Id/contract Id : 25ia0115 Contract Name : Construction (completion) Of Multi-purpose Building, Barangay Binohangan, Caibiran, Biliran Contract Location : Brgy. Binohangan, Caibiran, Biliran (11.596326˚, 124.570058˚) Project Description/scope Of Work : Construction Of 1-storey Building Approved Budget For The Contract : P 1,978,469.83 Contract Duration : 75.00 C.d. Cost Of Bidding Documents : P 5,000.00 13. Procurement Id/contract Id : 25ia0116 Contract Name : Completion Of Multi-purpose Building, Barangay Trabugan, Maripipi, Biliran Contract Location : Brgy. Trabugan, Maripipi, Biliran (11.779571˚, 124.299212˚) Project Description/scope Of Work : Completion Of 1-storey Building Approved Budget For The Contract : P 1,978,412.59 Contract Duration : 70.00 C.d. Cost Of Bidding Documents : P 5,000.00 Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category Of Small B & Medium A As Per Pcab Resolution No. 201, Series Of 2017, (b) Completion Of A Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid Costing At Least 50% Of The Abc, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. Contractors/applicants Who Wish To Participate In The Biding Are Encouraged To Enroll With The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Building, Bonifacio Drive, Port Area Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 5. Interested Bidders May Obtain Further Information From Dpwh, Biliran District Engineering Office, Naval, Biliran And Inspect The Bidding Documents At The Address Given Below From 8:00a.m. To 5:00 P.m. Page 4 Of 4 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From The Address Below And Upon Payment Of An Applicable Fee For The Bidding Documents In The Amount Stated Above. Bidding Documents Fee May Be Refunded In Accordance With The Aforementioned Guidelines Based On The Grounds Provided For Under Section 41 Of The R.a. 9184 And Its Irr. Bidders Can Make Payments For The Purchase Of Bidding Documents At Any Dpwh Field Offices. The Schedule Of Key Procurement Activities For This Contract Is Shown Below: Activity Time Place Date Of Posting December 6, 2024 – December 26, 2024 Dpwh Web / Philgeps / Bulletin Board Issuance Of Bidding Documents December 6, 2024 – December 26, 2024 Bac Office, Biliran-deo, Naval, Biliran Pre-bid Conference December 13, 2024; 10:00 A.m. Bac Conference Room, Biliran-deo, Naval, Biliran Receipt By The Bac Of Bids December 26, 2024, 1:00 P.m. Bac Office, Biliran-deo, Naval, Biliran Opening Of Bids December 26, 2024; 1:00 P.m. Conference Room, Biliran-deo, Naval, Biliran 7. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That The Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. Pre-bid Conference And Opening Of Bids Will Be Held At The Bac Office, Dpwh-biliran District Engineering Office, Naval, Biliran Which Shall Be Open To All Interested Parties. Bidding For The Above Contract Shall Be Conducted “short Of Award” Pending Availability/ Receipt Of Fy-2025 Funds/saa. 9. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_biliran For Electronic Submission On Or Before December 26, 2024 At 1:00 P.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. 11. Bid Opening Shall Be On December 26, 2024 At 1:00 P.m. Immediately After The Deadline Of The Dropping Of Bids At Bac Conference Room, Biliran-deo, Naval, Biliran. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 12. The Dpwh-biliran District Engineering Office, Naval, Biliran Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of R.a. 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 13. For Further Information, Please Refer To: Head, Bac Secretariat Bac Office, Dpwh Biliran District Engineering Office Brgy. Calumpang, Naval, Biliran Province Telefax No.: (053) 500-9097 Email Add: Dpwh.bdeo@gmail.com Approved: Rosario B. Rosete Assistant District Engineer Bac Chairperson Noted: Irwin L. Antonio, Asean Eng. Oic-district Engineer encoded/printedbyrcpancito December 5, 2024
Closing Date7 Jan 2025
Tender AmountPHP 9.8 Million (USD 170.5 K)
Department Of Public Works And Highways Tender
Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Philippines
Details: Description Invitation To Bid December 5, 2024 1. The Dpwh–biliran District Engineering Office, Through Gaa Fy-2025, Intends To Apply The Sum Of The Approved Budget For The Contract (abc) Stated Below Being The Abc To Payments Under The Contracts Below. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Bid Opening And Declared Non-complying/failed. 2. The Dpwh–biliran District Engineering Office, Through Its Bids And Awards Committee (bac) Now Invites Bids For The Hereunder Works Of The Following Contract/s: 1. Procurement Id/contract Id : 25ia0104 Contract Name : Installation/application Of Road Safety Facilities - Naval-caibiran Cross Country Rd - K1027+000 - K1031+530 Contract Location : Naval, Biliran (11.565233°, 124.404044°- 11.578701°, 124.441236°) Project Description/scope Of Work : Installation Of 181 Units Of Solar Street Lights Approved Budget For The Contract : P 29,398,224.41 Contract Duration : 130.00 C.d. Cost Of Bidding Documents : P 25,000.00 2. Procurement Id/contract Id : 25ia0105 Contract Name : Construction Of Access Roads Leading To Declared Tourism Destinations - Access Road Leading To Subing Subing Hill, Kawayan, Biliran Contract Location : Brgy. Balacson, Kawayan, Biliran 11.669727, 124.344403 - 11.671273, 124.343774 (location 1) 11.675592, 124.343897 - 11.676395, 124.343767 (location 2) Project Description/scope Of Work : Construction Of 0.746 Lane Kilometer Road, 0.23m Thick & 6.10m Width With Embankment, Drainage, And Slope Protection Structure Approved Budget For The Contract : P 19,598,031.50 Contract Duration : 160.00 Cd Cost Of Bidding Documents : P 25,000.00 3. Procurement Id/contract Id : 25ia0106 Contract Name : Construction Of Drainage, Barangay Calumpang, Naval, Biliran Contract Location : Brgy. Calumpang, Naval, Biliran Location 1 - (11.568507°, 124.412067° - 11.570055°, 124.41164°) Location 2 - (11.569489°, 124.411632° - 11.569495°, 124.41162°) Project Description/scope Of Work : Construction Of 616.70 Ln.m Open Drainage (lined Canal) W/ Metal Frames And Gratings Approved Budget For The Contract : P 4,948,200.18 Contract Duration : 85.00 C.d. Cost Of Bidding Documents : P 5,000.00 Page 2 Of 4 4. Procurement Id/contract Id : 25ia0107 Contract Name : Construction Of Seawall, Barangay Mabini, Naval, Biliran Contract Location : Brgy. Mabini, Naval, Biliran (11.564381°, 124.275058° - 11.564806°, 124.274625°) Project Description/scope Of Work : Construction Of 93.20 Ln.m. Seawall Structure With Reinforced Concrete Facing Approved Budget For The Contract : P 9,898,256.03 Contract Duration : 165.00 C.d. Cost Of Bidding Documents : P 10,000.00 5. Procurement Id/contract Id : 25ia0108 Contract Name : Construction Of Bagongbong Flood Control, Barangay Salangi, Almeria, Biliran Contract Location : Almeria, Biliran (124.394165°, 11.621246° - 124.394360°, 11.623738°) Project Description/scope Of Work : Construction Of 334.00 Ln.m. Flood Control Structure Approved Budget For The Contract : P 19,598,391.73 Contract Duration : 143.00 C.d. Cost Of Bidding Documents : P 25,000.00 6. Procurement Id/contract Id : 25ia0109 Contract Name : Construction Of Flood Control Structure, Barangay Casiawan, Cabucgayan, Biliran Contract Location : Cabucgayan, Biliran (124.573765°, 11.484283° - 124.575893°, 11.486335°) Project Description/scope Of Work : Construction Of 424.00 Ln.m. Flood Control Structure Approved Budget For The Contract : P 19,598,372.48 Contract Duration : 143.00 C.d. Cost Of Bidding Documents : P 25,000.00 7. Procurement Id/contract Id : 25ia0110 Contract Name : Construction Two-storey Office Building, Dpwh Biliran Deo, Bureau Of Equipment, 8th Res, Barangay Larrazabal, Naval, Biliran Contract Location : Brgy. Larrazabal, Naval, Biliran (11.583267, 124.409843 & 11.58306, 124.409215) Project Description/scope Of Work : Construction Of 2-storey Building Approved Budget For The Contract : P 48,998,346.17 Contract Duration : 250.00 C.d. Cost Of Bidding Documents : P 25,000.00 8. Procurement Id/contract Id : 25ia0111 Contract Name : Construction Of Multi-purpose Building, Barangay Matanggo, Almeria, Biliran Contract Location : Barangay Matanggo, Almeria, Biliran (11.647594, 124.124.368010) Project Description/scope Of Work : Construction Of 1-storey Building Approved Budget For The Contract : P 4,948,276.36 Contract Duration : 140.00 C.d. Cost Of Bidding Documents : P 5,000.00 9. Procurement Id/contract Id : 25ia0112 Contract Name : Construction Of Multi-purpose Building,barangay, P.i. Garcia, Naval, Biliran Contract Location : Brgy. P.i. Garcia, Naval, Biliran (11.563721, 124.395253) Project Description/scope Of Work : Construction Of 2-storey Building Approved Budget For The Contract : P 4,898,328.55 Contract Duration : 180.00 C.d. Cost Of Bidding Documents : P 5,000.00 Page 3 Of 4 10. Procurement Id/contract Id : 25ia0113 Contract Name : Construction (completion) Of Multi-purpose Building, Barangay Pulang Bato, Almeria, Biliran Contract Location : Barangay Pulang Bato, Almeria, Biliran (11.600953, 124.390656) Project Description/scope Of Work : Construction Of 1-storey Building Approved Budget For The Contract : P 4,948,276.06 Contract Duration : 140.00 C.d. Cost Of Bidding Documents : P 5,000.00 11. Procurement Id/contract Id : 25ia0114 Contract Name : Construction Of Multi-purpose Building, Barangay Union, Caibiran, Biliran Contract Location : Brgy.union, Caibiran, Biliran (11.56519194⁰, 124.55213936⁰) Project Description/scope Of Work : Construction Of 1-storey Building Approved Budget For The Contract : P 4,948,219.25 Contract Duration : 125.00 C.d. Cost Of Bidding Documents : P 5,000.00 12. Procurement Id/contract Id : 25ia0115 Contract Name : Construction (completion) Of Multi-purpose Building, Barangay Binohangan, Caibiran, Biliran Contract Location : Brgy. Binohangan, Caibiran, Biliran (11.596326˚, 124.570058˚) Project Description/scope Of Work : Construction Of 1-storey Building Approved Budget For The Contract : P 1,978,469.83 Contract Duration : 75.00 C.d. Cost Of Bidding Documents : P 5,000.00 13. Procurement Id/contract Id : 25ia0116 Contract Name : Completion Of Multi-purpose Building, Barangay Trabugan, Maripipi, Biliran Contract Location : Brgy. Trabugan, Maripipi, Biliran (11.779571˚, 124.299212˚) Project Description/scope Of Work : Completion Of 1-storey Building Approved Budget For The Contract : P 1,978,412.59 Contract Duration : 70.00 C.d. Cost Of Bidding Documents : P 5,000.00 Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category Of Small B & Medium A As Per Pcab Resolution No. 201, Series Of 2017, (b) Completion Of A Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid Costing At Least 50% Of The Abc, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. Contractors/applicants Who Wish To Participate In The Biding Are Encouraged To Enroll With The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Building, Bonifacio Drive, Port Area Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 5. Interested Bidders May Obtain Further Information From Dpwh, Biliran District Engineering Office, Naval, Biliran And Inspect The Bidding Documents At The Address Given Below From 8:00a.m. To 5:00 P.m. Page 4 Of 4 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From The Address Below And Upon Payment Of An Applicable Fee For The Bidding Documents In The Amount Stated Above. Bidding Documents Fee May Be Refunded In Accordance With The Aforementioned Guidelines Based On The Grounds Provided For Under Section 41 Of The R.a. 9184 And Its Irr. Bidders Can Make Payments For The Purchase Of Bidding Documents At Any Dpwh Field Offices. The Schedule Of Key Procurement Activities For This Contract Is Shown Below: Activity Time Place Date Of Posting December 6, 2024 – December 26, 2024 Dpwh Web / Philgeps / Bulletin Board Issuance Of Bidding Documents December 6, 2024 – December 26, 2024 Bac Office, Biliran-deo, Naval, Biliran Pre-bid Conference December 13, 2024; 10:00 A.m. Bac Conference Room, Biliran-deo, Naval, Biliran Receipt By The Bac Of Bids December 26, 2024, 1:00 P.m. Bac Office, Biliran-deo, Naval, Biliran Opening Of Bids December 26, 2024; 1:00 P.m. Conference Room, Biliran-deo, Naval, Biliran 7. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That The Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. Pre-bid Conference And Opening Of Bids Will Be Held At The Bac Office, Dpwh-biliran District Engineering Office, Naval, Biliran Which Shall Be Open To All Interested Parties. Bidding For The Above Contract Shall Be Conducted “short Of Award” Pending Availability/ Receipt Of Fy-2025 Funds/saa. 9. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_biliran For Electronic Submission On Or Before December 26, 2024 At 1:00 P.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. 11. Bid Opening Shall Be On December 26, 2024 At 1:00 P.m. Immediately After The Deadline Of The Dropping Of Bids At Bac Conference Room, Biliran-deo, Naval, Biliran. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 12. The Dpwh-biliran District Engineering Office, Naval, Biliran Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of R.a. 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 13. For Further Information, Please Refer To: Head, Bac Secretariat Bac Office, Dpwh Biliran District Engineering Office Brgy. Calumpang, Naval, Biliran Province Telefax No.: (053) 500-9097 Email Add: Dpwh.bdeo@gmail.com Approved: Rosario B. Rosete Assistant District Engineer Bac Chairperson Noted: Irwin L. Antonio, Asean Eng. Oic-district Engineer encoded/printedbyrcpancito December 5, 2024
Closing Date7 Jan 2025
Tender AmountPHP 4.9 Million (USD 85.2 K)
Department Of Public Works And Highways Tender
Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Philippines
Details: Description Invitation To Bid December 5, 2024 1. The Dpwh–biliran District Engineering Office, Through Gaa Fy-2025, Intends To Apply The Sum Of The Approved Budget For The Contract (abc) Stated Below Being The Abc To Payments Under The Contracts Below. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Bid Opening And Declared Non-complying/failed. 2. The Dpwh–biliran District Engineering Office, Through Its Bids And Awards Committee (bac) Now Invites Bids For The Hereunder Works Of The Following Contract/s: 1. Procurement Id/contract Id : 25ia0104 Contract Name : Installation/application Of Road Safety Facilities - Naval-caibiran Cross Country Rd - K1027+000 - K1031+530 Contract Location : Naval, Biliran (11.565233°, 124.404044°- 11.578701°, 124.441236°) Project Description/scope Of Work : Installation Of 181 Units Of Solar Street Lights Approved Budget For The Contract : P 29,398,224.41 Contract Duration : 130.00 C.d. Cost Of Bidding Documents : P 25,000.00 2. Procurement Id/contract Id : 25ia0105 Contract Name : Construction Of Access Roads Leading To Declared Tourism Destinations - Access Road Leading To Subing Subing Hill, Kawayan, Biliran Contract Location : Brgy. Balacson, Kawayan, Biliran 11.669727, 124.344403 - 11.671273, 124.343774 (location 1) 11.675592, 124.343897 - 11.676395, 124.343767 (location 2) Project Description/scope Of Work : Construction Of 0.746 Lane Kilometer Road, 0.23m Thick & 6.10m Width With Embankment, Drainage, And Slope Protection Structure Approved Budget For The Contract : P 19,598,031.50 Contract Duration : 160.00 Cd Cost Of Bidding Documents : P 25,000.00 3. Procurement Id/contract Id : 25ia0106 Contract Name : Construction Of Drainage, Barangay Calumpang, Naval, Biliran Contract Location : Brgy. Calumpang, Naval, Biliran Location 1 - (11.568507°, 124.412067° - 11.570055°, 124.41164°) Location 2 - (11.569489°, 124.411632° - 11.569495°, 124.41162°) Project Description/scope Of Work : Construction Of 616.70 Ln.m Open Drainage (lined Canal) W/ Metal Frames And Gratings Approved Budget For The Contract : P 4,948,200.18 Contract Duration : 85.00 C.d. Cost Of Bidding Documents : P 5,000.00 Page 2 Of 4 4. Procurement Id/contract Id : 25ia0107 Contract Name : Construction Of Seawall, Barangay Mabini, Naval, Biliran Contract Location : Brgy. Mabini, Naval, Biliran (11.564381°, 124.275058° - 11.564806°, 124.274625°) Project Description/scope Of Work : Construction Of 93.20 Ln.m. Seawall Structure With Reinforced Concrete Facing Approved Budget For The Contract : P 9,898,256.03 Contract Duration : 165.00 C.d. Cost Of Bidding Documents : P 10,000.00 5. Procurement Id/contract Id : 25ia0108 Contract Name : Construction Of Bagongbong Flood Control, Barangay Salangi, Almeria, Biliran Contract Location : Almeria, Biliran (124.394165°, 11.621246° - 124.394360°, 11.623738°) Project Description/scope Of Work : Construction Of 334.00 Ln.m. Flood Control Structure Approved Budget For The Contract : P 19,598,391.73 Contract Duration : 143.00 C.d. Cost Of Bidding Documents : P 25,000.00 6. Procurement Id/contract Id : 25ia0109 Contract Name : Construction Of Flood Control Structure, Barangay Casiawan, Cabucgayan, Biliran Contract Location : Cabucgayan, Biliran (124.573765°, 11.484283° - 124.575893°, 11.486335°) Project Description/scope Of Work : Construction Of 424.00 Ln.m. Flood Control Structure Approved Budget For The Contract : P 19,598,372.48 Contract Duration : 143.00 C.d. Cost Of Bidding Documents : P 25,000.00 7. Procurement Id/contract Id : 25ia0110 Contract Name : Construction Two-storey Office Building, Dpwh Biliran Deo, Bureau Of Equipment, 8th Res, Barangay Larrazabal, Naval, Biliran Contract Location : Brgy. Larrazabal, Naval, Biliran (11.583267, 124.409843 & 11.58306, 124.409215) Project Description/scope Of Work : Construction Of 2-storey Building Approved Budget For The Contract : P 48,998,346.17 Contract Duration : 250.00 C.d. Cost Of Bidding Documents : P 25,000.00 8. Procurement Id/contract Id : 25ia0111 Contract Name : Construction Of Multi-purpose Building, Barangay Matanggo, Almeria, Biliran Contract Location : Barangay Matanggo, Almeria, Biliran (11.647594, 124.124.368010) Project Description/scope Of Work : Construction Of 1-storey Building Approved Budget For The Contract : P 4,948,276.36 Contract Duration : 140.00 C.d. Cost Of Bidding Documents : P 5,000.00 9. Procurement Id/contract Id : 25ia0112 Contract Name : Construction Of Multi-purpose Building,barangay, P.i. Garcia, Naval, Biliran Contract Location : Brgy. P.i. Garcia, Naval, Biliran (11.563721, 124.395253) Project Description/scope Of Work : Construction Of 2-storey Building Approved Budget For The Contract : P 4,898,328.55 Contract Duration : 180.00 C.d. Cost Of Bidding Documents : P 5,000.00 Page 3 Of 4 10. Procurement Id/contract Id : 25ia0113 Contract Name : Construction (completion) Of Multi-purpose Building, Barangay Pulang Bato, Almeria, Biliran Contract Location : Barangay Pulang Bato, Almeria, Biliran (11.600953, 124.390656) Project Description/scope Of Work : Construction Of 1-storey Building Approved Budget For The Contract : P 4,948,276.06 Contract Duration : 140.00 C.d. Cost Of Bidding Documents : P 5,000.00 11. Procurement Id/contract Id : 25ia0114 Contract Name : Construction Of Multi-purpose Building, Barangay Union, Caibiran, Biliran Contract Location : Brgy.union, Caibiran, Biliran (11.56519194⁰, 124.55213936⁰) Project Description/scope Of Work : Construction Of 1-storey Building Approved Budget For The Contract : P 4,948,219.25 Contract Duration : 125.00 C.d. Cost Of Bidding Documents : P 5,000.00 12. Procurement Id/contract Id : 25ia0115 Contract Name : Construction (completion) Of Multi-purpose Building, Barangay Binohangan, Caibiran, Biliran Contract Location : Brgy. Binohangan, Caibiran, Biliran (11.596326˚, 124.570058˚) Project Description/scope Of Work : Construction Of 1-storey Building Approved Budget For The Contract : P 1,978,469.83 Contract Duration : 75.00 C.d. Cost Of Bidding Documents : P 5,000.00 13. Procurement Id/contract Id : 25ia0116 Contract Name : Completion Of Multi-purpose Building, Barangay Trabugan, Maripipi, Biliran Contract Location : Brgy. Trabugan, Maripipi, Biliran (11.779571˚, 124.299212˚) Project Description/scope Of Work : Completion Of 1-storey Building Approved Budget For The Contract : P 1,978,412.59 Contract Duration : 70.00 C.d. Cost Of Bidding Documents : P 5,000.00 Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category Of Small B & Medium A As Per Pcab Resolution No. 201, Series Of 2017, (b) Completion Of A Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid Costing At Least 50% Of The Abc, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. Contractors/applicants Who Wish To Participate In The Biding Are Encouraged To Enroll With The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Building, Bonifacio Drive, Port Area Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 5. Interested Bidders May Obtain Further Information From Dpwh, Biliran District Engineering Office, Naval, Biliran And Inspect The Bidding Documents At The Address Given Below From 8:00a.m. To 5:00 P.m. Page 4 Of 4 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From The Address Below And Upon Payment Of An Applicable Fee For The Bidding Documents In The Amount Stated Above. Bidding Documents Fee May Be Refunded In Accordance With The Aforementioned Guidelines Based On The Grounds Provided For Under Section 41 Of The R.a. 9184 And Its Irr. Bidders Can Make Payments For The Purchase Of Bidding Documents At Any Dpwh Field Offices. The Schedule Of Key Procurement Activities For This Contract Is Shown Below: Activity Time Place Date Of Posting December 6, 2024 – December 26, 2024 Dpwh Web / Philgeps / Bulletin Board Issuance Of Bidding Documents December 6, 2024 – December 26, 2024 Bac Office, Biliran-deo, Naval, Biliran Pre-bid Conference December 13, 2024; 10:00 A.m. Bac Conference Room, Biliran-deo, Naval, Biliran Receipt By The Bac Of Bids December 26, 2024, 1:00 P.m. Bac Office, Biliran-deo, Naval, Biliran Opening Of Bids December 26, 2024; 1:00 P.m. Conference Room, Biliran-deo, Naval, Biliran 7. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That The Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. Pre-bid Conference And Opening Of Bids Will Be Held At The Bac Office, Dpwh-biliran District Engineering Office, Naval, Biliran Which Shall Be Open To All Interested Parties. Bidding For The Above Contract Shall Be Conducted “short Of Award” Pending Availability/ Receipt Of Fy-2025 Funds/saa. 9. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_biliran For Electronic Submission On Or Before December 26, 2024 At 1:00 P.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. 11. Bid Opening Shall Be On December 26, 2024 At 1:00 P.m. Immediately After The Deadline Of The Dropping Of Bids At Bac Conference Room, Biliran-deo, Naval, Biliran. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 12. The Dpwh-biliran District Engineering Office, Naval, Biliran Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of R.a. 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 13. For Further Information, Please Refer To: Head, Bac Secretariat Bac Office, Dpwh Biliran District Engineering Office Brgy. Calumpang, Naval, Biliran Province Telefax No.: (053) 500-9097 Email Add: Dpwh.bdeo@gmail.com Approved: Rosario B. Rosete Assistant District Engineer Bac Chairperson Noted: Irwin L. Antonio, Asean Eng. Oic-district Engineer encoded/printedbyrcpancito December 5, 2024
Closing Date7 Jan 2025
Tender AmountPHP 4.9 Million (USD 85.2 K)
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Others
United States
Details: 1. This Is A Combined Synopsis/solicitation For Commercial Services/items Prepared In Accordance With The Format In Far Subpart 12.6 In Conjunction With Far Part 13, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Separate Written Solicitation Will Not Be Issued.
1.a. Project Title: Millenium Hx Portable Reverse Osmosis Service
1.b. Description: Va Greater Los Angeles Healthcare System Is Seeking A Contractor To Provide Quarterly Maintenance Services On Selected Government Owned Portable Mar Cor/evoqua Reverse Osmosis Equipment At The Va Greater Los Angeles Healthcare System (va Glahs).
1.c. Project Location: Va Greater Los Angeles Healthcare System
1.d. Solicitation Type - Number: Request For Quotes (rfq) - 36c26225q0309.
1.e. Set Aside: This Solicitation Is Issued As An Unrestricted Open Market.
1.f. Applicable Naics Code: 221310, Water Supply And Irrigation Systems.
1.g. Small Business Size Standard: $41 Million
1.h. Type Of Contract: Firm Fixed Price
1.i. Period Of Performance: One Year
1.j. Wage Determination Applicable To This Project: Sca Wd 2015-5613 Revision 27
1.l. Request For Information (rfi) Should Be Submitted Via Email No Later Than 2pm Pst Monday, January 6th, 2025, To Ositadima.ndubizu@va.gov
2. Statement Of Work
2.1. Objective. Va Greater Los Angeles Healthcare System Is Seeking A Contractor To Provide Quarterly Maintenance Services On Selected Government Owned Portable Reverse Osmosis Equipment At The Va Greater Los Angeles Healthcare System (va Glahs).
2.2. Background. - The Va Greater Los Angeles Healthcare System (vaglahcs) Requires Quarterly Maintenance Services On Selected Government Owned Portable Reverse Osmosis Equipment At The West La Va Medical Center (wla Vamc). The Services Shall Comply With This Performance Work Statement (pws), All Va, Local, State, And Federal Policies, And Regulations.
2.3. Scope. The Contractor Shall Provide All Labor, Materials, Freight Costs, And Equipment To Accomplish The Tasks Outlined In This Pws. Contractor Is Responsible For All Subcontractors Required To Complete Reports.
all Work Shall Be Performed During Normal Hours Unless Otherwise Approved By The Cor Or His/her Designee.
all Work Shall Be In Accordance With Manufacturer S Instructions, Including, But Not Limited To, Adjustments, Calibration, Cleaning, Lubrication, Testing, Disassembly, Checkout, Replacement Of Worn And/ Or Defective Parts, The Above Shall Be Performed As Necessary As Required To Keep Each Equipment In Optimal Working Condition.
maintenance And Inspection (pmi)
the Contractor Shall Perform Maintenance On The Portable Reverse Osmosis Systems According To The Schedule Below.
the Contractor Shall Provide All Preventive Maintenance Replacement Parts At No Cost To The Government.
the Contractor Shall Provide All Travel And Transportation Expenses At No Additional Cost To The Government.
services
the Contractor Shall Provide Services Described In The Below Chart.
emergency Repair Services
emergency Funds Are Set Aside For Any Repair Services That Are Needed
these Emergency Funds Will Cover Service Cost For The Portable Reverse Osmosis System If These Systems Encounter Any Issues.
contractor Must Respond To Service Requests Within 24 Hours. Onsite Evaluation (if Required) Must Occur Within 3 Business Days Of Receiving A Service Request.
the Contractor Shall Provide An Estimated Cost For The Repair Parts/services And Must Receive Consent From The Cor Before Proceeding.
equipment List
covered
equipment
equipment Name
serial Number/brand
ee#
equipment Description
31311-mh01
1365065
177385
millenium Hx
31311-mh02
1367468
177386
millenium Hx
31311-mh03
1367471
177387
millenium Hx
31311-mh04
1367472
177388
millenium Hx
31311-mh05
1367473
177389
millenium Hx
31311-mh06
1367474
177390
millenium Hx
schedule
qualification
personnel Performing Maintenance And Repair Services Must Be Fully Qualified, Competent Field Service Engineers (fse) Who Has Been Trained To Perform Work On The Specific Equipment In Accordance With The Original Manufacturer S Maintenance And Repair Procedures. Fully Qualified Is Defined As Factory-trained And Experienced To Work On The Equipment Assigned.
additional Requirements
contractor Shall Ensure All Equipment Is In Optimal Working Condition At The Expiration Date Of The Contract.
contractor Personnel That Perform Changes, Updates, Or Retrofits Made On Any Component, System, Or Equipment Will Log It In The Station Equipment Manual.
contractor Will Maintain All Manufactures Manual Necessary To Perform Maintenance.
submission Of Reports
the Contractor Shall Submit A Complete Field Service Report (fsr) Electronically To The Cor Within 7 Calendar Days Of The Work Being Completed. The Fsr At A Minimum Must Contain Company Name, Service Technician S Name, Contact Telephone Number, Date Of Service, A Detailed Description Of Any Services Performed On The Equipment (model Number And Location Included), Serial Number Of The Equipment Being Worked On, Customer Asset Number (ee# - If Applicable) Of The Equipment Being Worked On, Signs Of Misuse Or Neglect, Findings Of Problems And Correction, Including All Performance Verification, Listing Of Replacement Parts, When Applicable; Total Hours Of Service; Safety Check; Performance Data; And Recommendations Necessary To Maintain The Equipment In Optimum Operating Condition.
2.4. Performance Monitoring. The Contracting Officer Representative (cor) Will Monitor Contractor Performance And Certify The Work Was Done In Accordance With The Sow.
2.5. Period Of Performance. The Period Of Performance Will Be One Year.
work Hours
normal Hours Of Operation Are Monday Through Friday From 6:00 Am To 6:00 Pm Pacific Time. All Work Is Expected To Be Performed Generally During Normal Hours Of Coverage Unless Requested Or Approved By The Cor Or His/her Designee.
before Commencement Of Work, The Contractor Shall Confer With The Va Cor And Contracting Office To Agree On A Sequence Of Procedures; Means Of Access To Premises And Building. All Work Performed, To Include Delivery Of Materials And Equipment, Shall Be Made With Minimal Interference To Government Operations And Personnel.
work Performed Outside The Normal Hours Of Coverage Must Be Approved By The Cor Or His/her Designee.
all Time Shall Be Approved In Advance By The Contracting Officer S Representative (cor). Allow 5-days For Approval Of Any Alternate Working Hours Needed.
a. National Holidays:
new Year S Day January 01
martin Luther King S Birthday Third Monday In January
president S Day Third Monday In February
memorial Day Last Monday In May
juneteenth June 19
independence Day July 04
labor Day First Monday In September
columbus Day Second Monday In October
veterans Day November 11
thanksgiving Day Fourth Thursday In November
christmas Day December 25
b. If The Holiday Falls On A Sunday, The Following Monday Will Be Observed As A National Holiday. When A Holiday Falls On A Saturday, The Preceding Friday Is Observed As A National Holiday By U.s. Government Agencies, And Any Day Specifically Declared By The President Of The United States Of America.
overtime & Holiday Pay: Overtime Pay Is At The Rate Of One And One-half Times The Employee's Regular Rate Of Pay For All Hours Worked In Excess Of Eight Up To And Including 12 Hours In Any Workday, And For The First Eight Hours Of Work On The Seventh Consecutive Day Of Work In A Workweek. Overtime Pay Also Includes Federal Holidays.
2.6. Contractor Personnel Background Requirements.
a. The Office Of Security And Law Enforcement Provides Department-wide Policy On The Assignment Of Appropriate Position Sensitivity Designations Associated With Department Of Veterans Affairs (va) Positions Involving National Security And Public Trust Responsibilities, And On The Level Of Background Investigations Required For Applicants For, And Incumbents Of, Those Positions. In Addition To Va Employees, The Policy And Investigative Requirements Are Applicable To Contractor Personnel Who Require Access To Va Computer Systems Designated As Sensitive.
b. Personnel Who Require Access To Va Computer Systems Shall Be Subject To All Necessary Background Investigations And Receive A Favorable Adjudication From The Va Office Of Security And Law Enforcement To Ensure Compliance With Such Policy. If Such Investigation Has Not Been Completed Prior To Contract Commencement, The Contractor Shall Be Responsible For The Actions Of Those Individuals Performing Under The Contract.
c. Should The Contract Require Contractor Personnel To Maintain U.s. Citizenship, The Contractor Shall Be Responsible For Compliance. Regardless Of U.s. Citizenship Requirements, Contractor Personnel Are Required To Read, Write, Speak, And Understand The English Language, Unless Otherwise Specified In This Contract Or Agreed To By The Government.
d. The Cost Of Such Investigations Shall Be Borne By The Contractor, Either In Advance Or As Reimbursement To The Government. The Level Of Sensitivity Shall Be Determined By The Government On The Basic Of The Type Of Access Required. The Level Of Sensitivity Will Determine The Depth Of The Investigation And The Cost Thereof. Currently, The Current Estimated Costs For Such Investigations Are As Follows:
level Of Sensitivity Background Investigation Level Approximate Cost
low Risk National Agency Check With Written Inquiries $ 231.00
moderate Risk Minimum Background Investigation $ 825.00
high Risk Background Investigation $ 3,465.00
e. The Contractor Shall Be Required To Furnish All Applicable Employee Information Required To Conduct The Investigation, Such As, But Not Limited To, The Name, Address, And Social Security Number Of Contractor Personnel. The Va Will Provide All The Necessary Instructions And Guidance For Submission Of The Documents Required To Conduct The Background Investigation. Background Investigations Shall Not Be Required For Contractor Personnel Who Will Not Be Required To Access Va Computer Systems Nor Gain Access To Sensitive Materials.
2.7. Contractor Employees
a. The Contractor Shall Not Employ Persons For Work On This Contract If Such Employee Is Identified To The Contractor As A Potential Threat To The Health, Safety, Security, General Well-being Or Operational Mission Of The Installation And Its Population. Contract Personnel Shall Be Subject To The Same Quality Assurance Standards Or Exceed Current Recognized National Standards As Established By The Joint Commission (jc).
b. Badge. Contractor Shall Obtain A Contractor I.d Badge From The Va Police. All Contractor Personnel Are Required To Wear I.d Badge During The Entire Time On Va Facility. The I.d Badge Must Have An Identification Picture And Shall State The Name Of The Individual And The Company Represented.
c. Parking: It Is The Responsibility Of The Contract Personnel To Park In The Appropriate Designated Parking Areas. Parking Information Is Available From Va Police & Security Service Office. The Contractor Assumes Full Responsibility For Any Parking Violations.
d. Smoking Is Strictly Prohibited On The Grounds Of Any Vha Facility. Per Vha Directive 1085 Dated March 5, 2019, It Is Vha Policy That All Vha Health Care Facilities, Including Hospitals, Community Clinics, Administrative Offices, And Vet Centers, Will Be Smoke-free For Patients, Visitors, Contractors, Volunteers, And Vendors Effective October 1, 2019. There Will No Longer Be Designated Smoking Areas.
2.8. Insurance Coverage
a. The Contractor Agrees To Procure And Maintain, While The Contract Is In Effect, Workers Compensation And Employee S Public Liability Insurance In Accordance With Federal And State Of California Laws. The Contractor Shall Be Responsible For All Damage To Property, Which May Be Done By Him, Or Any Employee Engaged In The Performance Of This Contract.
b. The Government Shall Be Held Harmless Against Any Or All Loss, Cost, Damage, Claim Expense Or Liability Whatsoever, Because Of Accident Or Injury To Persons Or Property Of Others Occurring In The Performance Of This Contract.
c. Before Commencing Work Under This Contract, The Contracting Officer Shall Require The Contractor To Furnish Certification From His/her Insurance Company Indicating That The Coverage Specified By Far 52.228-5 And Per Far Subpart 28.307-2 Has Been Obtained And That It May Not Be Changed Or Canceled Without Guaranteed Thirty (30) Day Notice To The Contracting Officer.
d. The Contractor Shall Furnish To The Contracting Officer Within Fifteen (15) Days Of Award An Official Certification From The Insurance Company Indicating That The Coverage Has Been Obtained And That It May Not Be Changed Or Cancelled Without Guaranteed Thirty (30) Day Notice To The Contracting Officer. New Certifications Shall Be Furnished At Least Thirty (30) Days Prior To The Expiration Date Of The Current Insurance Policy. The Phrase Will Endeavor Is Not Acceptable Terms To The Government And Such Coverage Carrying That Phrase Will Be Rejected And Services May Not Be Rendered Until Proper Certificate Is Issued.
3. The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2019-01, Dated 10/10/2019. The Following Provisions And Clauses Apply To This Solicitation And Can Be Found In Enclosure 2.
3.a. Far 52.212-1, Instructions To Offerors Commercial Items
3.b. Far 52.212-2, Evaluation -- Commercial Items
3.c. Far 52.212-4, Contract Terms And Conditions -- Commercial Items
3.d. Far 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders -- Commercial Items
3.e. Supplemental Insurance Requirements
3.f. Vaar 852.219-10, Va Notice Of Total Service-disabled Veteran-owned Small Business Set-aside
3.g. Vaar 852.219-74, Limitations On Subcontracting Monitoring And Compliance
3.h. Far 52.233-2, Service Of Protest
3.i. Vaar 852.233-70, Protest Content/alternative Dispute Resolution
3.j. Vaar 852.233-71, Alternative Protest Procedure
4. Submit Written Offers In Accordance With The Following Instructions, As Well As Addendum To Far 52.212-1, Instruction To Offerors. Oral Offers Will Not Be Accepted. Complete And Submit Enclosure 1 Via Email No Later Than 10am Pst Thursday, January 9th, 2025, To Ositadima.ndubizu@va.gov. Ensure The Following Are Completed And/or Included In The Quote Packet:
4.3.a. Vendor Information With Uei Number (company Info And Quote Should Be On The Enclosure 1 Form)
4.3.b. Acknowledgement Of Amendments
4.3.c. Concurrence/non-concurrence With Solicitation Terms, Conditions, And Provisions
4.3.d. Schedule Of Services
4.3.e. Far 52.212-3, Offeror Representations And Certifications -- Commercial Items
your Quote Evaluation Will Be Based On Price And Your Ability To Provide The Following:
capabilities Statement Showing That They Can Perform The Tasks Listed In Section 2.3, Scope
past Performance: Any Prior Experience In Maintaining Portable Mar Cor/evoqua Reverse Osmosis Equipment. Vendor Must Be An Authorized Service Provider For Mar Cor/evoqua Products.
vendor Must Provide Proof Their Personnel Performing Maintenance And Repair Services Are Fully Qualified, Competent Field Service Engineers (fse) Who Has Been Trained To Perform Work On The Specific Equipment In Accordance With The Original Manufacturer S Maintenance And Repair Procedures.
Closing Date9 Jan 2025
Tender AmountRefer Documents
Caraga Regional Hospital Tender
Healthcare and Medicine
Corrigendum : Tender Amount Updated
Philippines
Details: Description Republic Of The Philippines Department Of Health Caraga Regional Hospital Surigao City Ooooooooo @@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@ Bids And Awards Committee Invitation To Bid Ib No. 2024-01-08 (117) Supply And Delivery Of Various Hemodialysis Supplies Under Single-year Framework Agreement ( Early Procurement Activity ) Approved Budget For The Contract: Php 5,298,140.00 ========================================================= 1. The Caraga Regional Hospital (crh), Through The Fy2025 Raf / Gaa Intends To Apply The Sum Of Being The Approved Budget For The Contract (abc) Of Five Million Two Hundred Ninety Eight Thousand One Hundred Forty Pesos Only ( Php 5,298,140.00 ) As To Payment Under The Contract For Supply And Delivery Of Various Hemodialysis Supplies Under Single-year Framework Agreement (early Procurement Activity). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening And Items Below Are Subject For A Competitive Bidding As Framework Agreement List. This Is A Lot Bid. Item No Description Qty Unit Of Measure Unit Cost Total Cost Lot 1 Hd Sterilant 1.1 50% Citric Acid Solution 5l, Buffer 3000 Gal 1,532.00 ₱4,596,000.00 Classification: Organic Acid Hazardous Substance: Citric Acid %(w/w) 50-52 Physical Data Appearance: Clear To Hazy Yellow Odor: Charactieristic Ph: 1.00-1.30 1,2 Peracitic Acid Sterilant 24 Gal 6,240.00 ₱149,760.00 1. Appearance: Colorless Or Pale Yellow Clear Aqueous Solution 2. Active Ingredients: Peracetic Acid: 4% Hydrogen Peroxide: 20% Acetic Acid: 10% 3. Odor: Acetic Acid Odor 4. Water-solubility: Dissolves Regardless The Ratio 5. Storage Stability: 18 Months At Normal Temperature Total ₱4,745,760.00 Lot 2 Hd Supplies 2.1 Gauze 4x4 70 Box 180.00 ₱12,600.00 4”x 4” 8 Ply 24 X 28 Mesh 100 Pads/pack 2.2 Syringe 10cc With Needle G21 70 Box 210.00 ₱12,250.00 Smooth And Double Plunger X 100/box 2.3 Syringe Dispo 5cc W/ G12/g23 70 Box 270.00 ₱18,900.00 Needle, Sharpest Needle, Polyprolene Barrel, Non-toxic Double Plunger, Smooth Movement Of Plunger, Thermoplastic Elastometer Gasket, Clear Prints On The Syringe, Luerlock, Undergone High Internsity Sterilization 100/box 2.4 Hardness Test Strips 100’s /bottle 10 Bottle 2,280.00 ₱ 22,800.00 Total ₱72,780.00 Lot 3 Hemodialysis Chemical Analysis Test 3.1 Chemical Water Analysis 4 Test 13,200.00 ₱52,800.00 (every 6 Months Of Test) 3.2 Chlorine Test Strips, 100s/bottle 10 Bottle 2,280.00 ₱22,800.00 Total Chlorine Range: 0 - 25- 50 - 200 - 500 - 800 - 1500 - 2000 Ppm 3.3 Peracetic Potency Strips 100 Strips/bottle 20 Bottle 3,000.00 ₱60,000.00 Concentrations Of Peracetic Acid At Or Below 400 Ppm Will “fail” And Concentrations At Or Above 800 Ppm Will “pass” With The Guardian Peracetic Acid Test Strips. 3.4 Peracetic Residual Strips 100 Strips/bottle 80 Bottle 1,800.00 ₱144,000.00 Concentrations Of Renalin In Dialyzer At Or Below 400 Ppm Will “fail” And Concentrations At Or Above 800 Ppm Will “pass” With The Guardian Peracetic Residual Test Strips. 3.5 Residual Peroxide Test Strips 100 Strips/bottle 80 Bottle 2,500.00 ₱200,000.00 A Semi-quantitative Procedure Provides The Hydrogen Peroxide Concentration Between 0 And 10 Ppm Comparing The Reacted Indicator Pad Color To The Color Chart On The Bottle Label. Color Blocks Represent Peroxide Concentrations Of 0, 1, 3, 5 And 10 Ppm. Total ₱479,600.00 Grand Total ₱5,298,140.00 Terms Of Reference Bidders Must Submit The Following During Post-qualification: 1 Samples If Offered Item Is Not Previously Procured Or If Required By The Procuring Entity 2 Brochures Indicating Specification 3 Terms Of Delivery: 15 Calendar Days Upon Receipt Of Call-off 4 Delivery Schedule: Upon Call Off 5 This Procurement Is Under Framework Agreement -single Year Framework Agreement 6 Terms Of Payment. Payment Shall Be Made Upon Complete Delivery Per Call – Off. Necessary Documents Are Required In Compliance With Auditing Rules And Regulations. 7 This Procurement Is Lot Bid – Single Lot And Awarded In One Contract. Bidder Shall Bid All The Items In A Lot. 8 Product Expiration Date Must Be At Least 6 Months To 1 Year From Date Of Delivery 9 Validity Of The Contract / Contract Termination 10 Without Prejudice To The Provision Of Applicable Laws, Rules And Guidelines, The Contract Shall Be Automatically Terminated Under The Following Conditions: 11 A. When The Total Quantity Specified In The Contract Has Been Exhausted Within A Single Year 12 B. For Any Justifiable Reason Ground Where The Contract Will Not Redound To The Benefit Of The Government Or There Is Violation Of The Contract. 13 Repeat Order: 14 1. No Repeat Order For An Item In Contract Being Awarded Shall Be Allowed Until After The Procuring Entity Has Exhausted The Estimated Quantity For The Same Item Specified Therein Or After The Contract Has Expired, Whichever Comes First, And Subject To The Conditions Provided In Section 51 Of Ra 9184 And Its Irr. For This Purpose, The Repeat Order Shall Be Availed Of Only Within Six (6) Months From The Date Of The Last Of Final Delivery Order Contract For A Specific Item Where The Estimated Quantity Has Been Exhausted, Or The Expiration Of The Contract. 15 2. In Case Repeat Order Is Allowed And Resorted To, The Twenty-five (25%) Maximum Allowable Quantity Shall Be Based On The Aggregate Quantity Of Actual Items Ordered And Delivered. 16 General Conditions 17 All Other Rules Governing Contract Implementation And Termination Under Ra 9184 And Its Irr, And Relevant Procurement Policies Shall Be Applicable. Technical Specification And Terms Of Reference Are Hereby Posted In Philgeps And Form An Integral Part Of This Invitation To Bid. 2. The Crh Now Invites Bids For The Procurement Of The Above-captioned Project. Delivery Of The Goods Is Required Within The Period Specified Under Section Vi (schedule Of Requirements). Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. Section 23.4.1.3.(ra 9184). The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty Five Percent ( 25% ) Of The Abc. Slcc Must Be Within 2 Years From The Submission Of Bids. (based On The Completion Date). The Single Largest Completed Contract (slcc) Must Pertain To Hemodialysis Supplies Or Medical Supplies Or A Similar In Nature, As Determined And Defined By The Bids And Awards Committee ( Bac ). For Procurement Where The Procuring Entity Has Determined, After The Conduct Of Market Research, That Imposition Of Either (a) Or (b) Will Likely Result To Failure Of Bidding Or Monopoly That Will Defeat The Purpose Of Public Bidding: The Bidder Should Comply With The Following Requirements: A. Completed At Least Two (2) Similar Contracts, The Aggregate Amount Of Which Should Be Equivalent To At Least Fifty Percent (50%) In The Case Of Non-expendable Supplies And Services Or Twenty-five Percent (25%) In The Case Of Expendable Supplies] Of The Abc For This Project; And B. The Largest Of These Similar Contracts Must Be Equivalent To At Least Half Of The Percentage Of The Abc As Required Above. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Nondiscretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee (bac) Secretariat, Caraga Regional Hospital, Surigao City And Inspect The Bidding Documents At The Address Given Above During 8:00 Am – 5:00 Pm, Monday To Friday. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 5, 2024 To January 08. 2025 On Or Before 10:00 A.m. From The Address Above And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Specified Below: Bidding Schedule Pre-bidding Conference December 16, 2024 At 9:00 A.m. Via Zoom Platform Link: Join Zoom Meeting Https://us06web.zoom.us/j/81682739663?pwd=qqb1jfgbvatdpssxch8hafbtcco9la.1 Meeting Id: 816 8273 9663 Passcode: 096095 Deadline Of Submission Of Bids January 08, 2025 At 10:00 A.m... Via Online And Submit Your Bidding Documents To This Email Address: Crhbac2020@gmail.com. Please Be Advised That Failure To Submit Bidding Documents To The Designated Official Email Address Will Result In Automatic Rejection And Disqualification. Opening Of Bids January 08, 2025 At 3:30 P.m. Via Zoom Platform Join Zoom Meeting Https://us06web.zoom.us/j/81337163910?pwd=ebqw909boftdzawx99jcu3wwqolsvo.1 Meeting Id: 813 3716 3910 Passcode: 242132 Complete Philippine Bidding Documents Please Click The Link Below: Https://drive.google.com/drive/folders/1gabl1vzoiuixzohvqrmu8ftjpo6f1hc1?usp=sharing Amount Of Bidding Documents: Lot 1: Php 5,000.00 Lot 2: Php 500.00 Lot 3: Php 500.00 The Above Payment Of Bidding Documents Is Only Applicable To Those Bidders That May Opt To Participate In Only 1 Or 2 Lots Out Of The 3 Lots. Bidders Who May Participate In All Of The Lots Shall Pay The Amount Of Php 10,000.00 Payment Of The Bidding Documents Is Non-refundable . It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. The Following Phlippine Bidding Documents Can Be Accessed In The Philgeps And All Form And Part Of This Invitation To Bid, To Wit: A. Technical Specification / Terms Of Reference/ List Of Items B. Instruction To Bidders: B.1. Documents To Be Submitted (checklist- This Will Be Discussed During The Pre-bid Conference) B.2. Memorandum Of Undertaking – Provision Thereof Is Strictly Implemented C. Guidelines On The Conduct Of The Electronic Submission And Receipt Of Bids By The Procuring Entity – Caraga Regional Hospital (crh) D. Philippine Bidding Documents E. Framework Agreement Guidelines F. Framework Agreement Lists F. Other Documents Essential Documents Required By This Procuring Entity And Ra 9184 6. The Crh Will Hold A Pre-bid Conference On The Above-mentioned Date, Time And Venue, Which Shall Be Opened To Prospective Bidders. The Pre-bidding Conference And Opening Of Bids Shall Be Conducted Through Videoconferencing, Webinar Or Virtual. Please Send Your Intent To Participate To Our Email Address As Provided Below. 7. Bids Must Be Duly Received By The Bac Secretariat At Via Designated Email On Or Before January 08, 2025 At 10:00 O’clock In The Morning. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bid Opening Shall Be On January 08, 2025 At 3:30 O’clock In The Afternoon At The Bac Conference Room, Beside Procurement Office, Caraga Regional Hospital, Rizal Street, Surigao City As Virtual / Electronic Bidding Via Zoom Platform. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Above. Late Bids Shall Not Be Accepted Under Any Circumstances May It Cause. 8. Furthermore, The Standard Philippine Bidding Document (pbd) Is Form And Part Of This Invitation In Accordance To Ra 9184 And Other Applicable Laws, Rules And Policy. 9. The Crh Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. The Opening And Receipt Of Bids Is Strictly Implemented Through Electronic Submission. Given The Covid-19 Pandemic, Procurement Activity Has Been Expedient And One Of This Is The Conduct Of Electronic Submission Of Bids. The Crh Thru The Bids And Awards Committee (bac) Has Submitted Certification, Certified By The Highest Official Managing The Information Technology, Describing The Electronic System Or Procedure To Be Used By The Crh For The Electronic Submission And Receipts Of Bids And A Statement That The Same Is Compliant With The Gppb Resolution No. 12-2020 Requirements. 11. Bidding Documents Shall Be Emailed To This Email Address, With Activated Password To: Crhbac2020@gmail.com. You May Deposit On Line For The Payment Of The Bidding Documents To This Account Below: Bank Name: Land Bank Of The Philippines Account Name: Caraga Regional Hospital-trust Fund Account Number: 0982 -1288 – 70 12. Furthermore Deposit Slip Shall Be Submitted Via Email To: Crhprocurement.bac@gmail.com 13. The Procuring Entity Will No Longer Accept Nor Entertain Any Form Of Bids Submission Except Electronic. Failure To Comply Electronic Submission Will Be Immediately Disqualified. Guideline On The Electronic Submission Is Hereby Attached. 14. Join The Caraga Regional Hospital Supplier Network By Filling Out The Registry Form From This Link : Https://bit.ly/crh_suppliersregistry 15. For Further Information, Please Inquire To: Bac Secretariat Caraga Regional Hospital. Rizal Street, Surigao City Tel. Nos. (086) 826-1575 Local 194 Direct Line: (086) 826-9058 Mobile Nos. 09850508783 (smart/tnt) 09539212832 (globe/tm) E-mail Address: Crhprocurement.bac@gmail.com Approved By: (sgd) Atty. Ma. Flordelin T. Ensomo, Cpa Attorney Iv Chairman, Bids And Awards Committee
Closing Date8 Jan 2025
Tender AmountPHP 5.2 Million (USD 91.2 K)
DEFENSE LOGISTICS AGENCY USA Tender
Healthcare and Medicine...+1Chemical Products
United States
Details: The Defense Health Agency (dha) Medical Logistics (medlog) Directorate Medical Materiel Enterprise Standardization Office (mmeso) And The Defense Logistics Agency (dla) Troop Support Medical Prime Vendor (pv) Program Announce A Sources Sought Notification For The Creation Of A Qualified Suppliers Listing (qsl) For Chlorhexidine Gluconate (chg) Applicators, Procedural. This Is Not A Request For A Price Quote.
these Chlorhexidine Gluconate (chg) Applicators, Procedural Products Are For Purchase By The Military Treatment Facilities (mtfs) Of The Military Health System (mhs) And For The Operational Assemblages Of The Army, Navy, Air Force, Marine Corps, And Naval Expeditionary Medical Support Command (nemscom) And Managed Regionally By Mmesos North, South, West, Pacific And Europe, Hereafter Referred To As Mmesos. For Information Regarding Dla Troop Support Medical’s Pv Program Please Access The Dmm Online Web Site At Https://www.medical.dla.mil.
this Sources Sought Notification Is Intended To Solicit Information And Products For Evaluation In Order To Create A Qsl For Chlorhexidine Gluconate (chg) Applicators, Procedural In Accordance With (iaw) Far 9.2. The Qsl For Chlorhexidine Gluconate (chg) Applicators, Procedural Will Be Established Approximately 07 February 2025 And Is Anticipated To Be The Basis Of A Standardization Action. All Medical Consumable Items On This Qsl Must Be On A Distribution And Pricing Agreement (dapa) For The Dla Troop Support Medical/surgical Prime Vendor (mspv) Program. All Participating Vendors Must Complete The Registration In The Dapa Management System (dms) At Https://www.medical.dla.mil/portal/dapams/dapams.aspx And Include Either Their Dapa Number Or Their Defense Medical Materiel (dmm) Number As Part Of Their Qsl Package Worksheet Submission. Receiving A Dmm Number Allows Access To The Dms And Is The First Step To Becoming A Dapa Holder. Dapa Holders Must Be Prepared To Ship Items To The Pvs, So That The Pvs May Carry Inventory And Mtfs May Designate Items As Usage; Therefore, Standardized Items May Not Be Coded In The Dms As "drop Ship Only."
note: It Is Recommended That New Participants Contact Each Pv Prior To Adding Items To Dapa, In Order To Gain A Full Understanding Of The Pv's Requirements And Any Potential Costs Associated With Pv Handling Of Those Items.
if You Qualify As A Vendor On The Qsl, You Will Then Be Invited, Approximately 13 February 2025, To Submit Pricing Quotes And A Separate Screenshot Of Your Submitted Dapa Log Submission Or Existing Dapa Base Uncommitted Pricing For All Required Items To The Mmeso Pocs. Both Pricing Quotes And Substantiating Dms Documentation Will Be Required For Eligibility To Enter Into An Incentive Agreement (ia) For Chlorhexidine Gluconate (chg) Applicators, Procedural. Only Those Vendors With An Established Dapa Will Be Eligible To Enter Into The Subsequent Ia. The Government Reserves The Right To Standardize Or Not Standardize On Chlorhexidine Gluconate (chg) Applicators, Procedural. The Resulting Ia Will Not Be A Contract And Will Not Constitute A Guarantee Of A Specific Volume Of Sales Dollars.
the Mspv Program Requires That All Items Be Manufactured In A Trade Agreements Act (taa) Compliant Country (see Dfars 252.225-7020 And 252.225-7021), Unless It Is Determined That No Functionally Equivalent Item Is Available From A Compliant Source. To Be Eligible For Inclusion In The Proposed Qsl, All Vendors Are Required To Provide Country Of Origin Information In The Qsl Package Worksheet. In Addition, According To The Dapa Terms And Conditions, Vendors Must Complete The Dapa Taa Certification For Each Item Quoted. If A Quoted Item Is A Taa Non-compliant End Product, The Government Can Use This Information To Determine Whether Or Not A Non-availability Determination Exists Or If The Government Will Make A Non-availability Determination For The Item. Unless A Non-availability Determination Is Made Or A Waiver Is Obtained, Taa Non-compliant Country End Products Cannot Be Added To The Qsl And/or Dapa.
note: The Contracting Officer Will Review Submissions In Response To The Subsequent Ia For Chlorhexidine Gluconate (chg) Applicators, Procedural For Country Of Origin Purposes. Only Vendors On The Qsl Who Offer Items Which Are Us Made, Designated Country, Or Qualifying Country End Products Will Be Considered For An Ia, Unless The Contracting Officer Determines That No Functional Equivalent Item Is Available From A Compliant Source In Accordance With Dfars 225.403(c)(i). Vendors Are Advised To Keep This In Mind When Submitting Their Response To This Sources Sought Notification.
a. Products & Performance Required
the Mmesos Are Seeking Product Line Items In The Category Of Chlorhexidine Gluconate (chg) Applicators, Procedural. Within The Mhs Mtfs And Operational Procurement This Product Line Has An Estimated Annual Sales Volume Of $812,276. This Forecast Is A Good Faith Estimate Based On Historical Usage Data During A Recent 12-month Period And Does Not Constitute A Guarantee Of A Specific Volume Of Sales Dollars. Four Items Are Required For Addition To The Qsl And Account For 100% Of The Total Volume In Sales $812,276. The Specifications For This Project Are Shown In The “requirements To Qualify For Qsl” Section Below.
b. Instructions To Vendors To Qualify For The Qsl
vendors Interested In Qualifying For Inclusion In The Qsl Must Respond To This Qsl Sources Sought Notification By Sending The Appropriate Qsl Package Worksheet And All Supporting Documentation Via E-mail To The Lead Mmeso And Dla Pocs Below. The Qsl Requirements Are Outlined Under Requirements To Qualify For Qsl Outlined Below.
vendor Must Complete The Qsl Package Worksheet In Full And Submit It To The Mmeso Pocs And Dla Poc As Listed In The Qsl Source Sought Notification By The Above Response Date. The Vendor’s Submission Must Include All Detailed Information Requested In The “requirements To Qualify For Qsl” Section Below And Must Also Include: (1) Company Name And Address; (2) Company Poc (name And Phone Number, Fax Number, And E-mail Address); (3) Commercial And Government Entity (cage) Code; (4) Identification Of The Sources Sought Notification To Which The Vendor Is Responding, And (5) Dapa Or Dmm Number.
only One Manufacturer Part Number May Be Provided For Each Product Description Listed In Requirement 5 Per Submitted Response.
vendors May Provide Multiple Responses/submissions To The Qsl Source Sought Notification.
vendor Must Offer Commercially Available Products For All Items Offered In Response To This Sources Sought Notification.
supporting Documentation Must Be In Form Of Commercially Available Catalogs And Product Literature (e.g. Brochures, User Manuals, Product Packaging, Product Specification Sheets, Product Images, Etc.).
due To The Potential For E-mail To Be Lost In Transmission, From Network Security, Etc., Vendors Are Strongly Encouraged To Confirm With The Mmeso Pocs That Their E-mail Submission Has Arrived. Each Submitting Vendor Is Advised To Confirm Receipt Allowing Adequate Time For Resubmission Before The Due Date And Time.
any Vendor Experiencing Difficulty Opening The Worksheet May Contact The Mmeso Pocs. The Mmeso Poc Will Provide A Worksheet Copy Via E-mail.
vendors That Do Not Meet The Deadline Of Cob 5:00 Pm Local Philadelphia Time For This Qsl Sources Sought Notification Will Not Be Included In The Mmeso’s Review To Establish The Qsl And Thus Will Not Be Able To Participate In The Subsequent Standardization Action.
requirements To Qualify For Qsl
the Requirements For This Product Line Are Outlined Below. Complete Answers And All Supporting Documentation Must Be Provided With The Vendor’s Submittal By The Response Date Stated In This Qsl Sources Sought Notification. A Vendor Who Does Not Meet All Of These Requirements Or Who Does Not Submit Documentation To Support These Requirements As Requested Will Not Be Qualified For The Qsl. Vendors Must Provide Responses To This Sources Sought Notification Via The Qsl Package Worksheet.
technical Review
supplier Requirements:
vendor Must Have A Dapa Or Be In The Process Of Applying For A Dapa Number For The Product Line Listed. Vendor Must Provide Their Dapa Number Or Provide Date Of Application And Dmm Number Proving Access To The Dms, As The Subsequent Standardization Action Requires Vendors To Have All Required Items On Dapa.
vendor Must Have An Agreement With The Current Dod Medical/surgical Prime Vendor Cardinal Health, Or Must Work With Cardinal Health To Initiate An Agreement, As Standardized Items From This Qsl Will Be Distributed Via The Mspv Program.
vendor Must Have An Agreement With The Current Dod Medical/surgical Prime Vendor Owens & Minor, Or Must Work With Owens & Minor To Initiate An Agreement, As Standardized Items From This Qsl Will Be Distributed Via The Mspv Program.
vendors Must Validate That Their Account Is Active In The System For Award Management (sam) And Provide Cage Code. Vendors In The Process Of Obtaining A Cage Code Must Provide Documentation To Support That They Have Registered In Sam. Vendors Without A Cage Code And/or A Sam Account Will Not Be Considered For Participation In The Subsequent Standardization Action. See Https://www.sam.gov/sam/.
required Products:
5. Vendor Must Provide Manufacturer Part Numbers That Meet The Product Descriptions Below. Vendor Must Submit The Following Information Via Qsl Response Worksheet For Each Offered Product: Vendor Part Number, Manufacturer Part Number, Manufacturer Name, Full Item Description, Unit Of Measure (uom), Quantity (qty) In Uom, Unit Of Inner Packaging (uop), Qty Of Uom In Uop, Unit Of Sale (uos), And Qty Of Uom In Uos. Vendor Must Provide Product Catalog And Literature For Any Items Offered In Response To This Sources Sought Notification. Only One Vendor Part Number Should Be Provided For Each Item/sample. Vendor Must Send The Same Part Number(s) For Evaluation(s) As Provided In Response To This Qsl Announcement And As Noted In The Qsl Package Worksheet. The Vendor Must Provide Country Of Origin For All Required Items And Any Optional Items Offered.
required Product(s) & Annual Usage In Units
5.1 Chlorhexidine Gluconate (2% Chg) Isopropyl Alcohol (70% Ipa) Applicators, Procedural, 1 Ml, Clear, Sterile / 161,460
5.2 Chlorhexidine Gluconate (2% Chg) Isopropyl Alcohol (70% Ipa) Applicators, Procedural, 1.5 Ml, Clear, Sterile / 198,080
5.3 Chlorhexidine Gluconate (2% Chg) Isopropyl Alcohol (70% Ipa) Applicators, Procedural, 3 Ml, Clear, Sterile / 327,975
5.4 Chlorhexidine Gluconate (2% Chg) Isopropyl Alcohol (70% Ipa) Applicators, Procedural, 3 Ml, Hi-lite Orange, Sterile /118,175
6. Vendor Must Provide Chlorhexidine Gluconate (chg) Applicator, Procedural Products That Are Not Made With Natural Rubber Latex. Vendor Must Also Provide Submittal Documentation Establishing That The Offered Products Are Not Made With Natural Rubber Latex. The Vendor Must Meet This Requirement In One Of Three Ways: 1) Demonstrating That The Labeling Or Product Information For The Offered Products Contains The Fda Recommended Statement "not Made With Natural Rubber Latex," 2) Demonstrating That The Iso Bs En 15223-1:2021 Symbol [reference Number 5.4.5 With Annex B.2 Negation Symbol] Is On The Labeling Or Product Information For The Offered Products, Or 3) If The Labeling Or Product Information Do Not Contain The Fda Recommended Statement Or The Iso Bs En 15223-1:2021 Symbol [reference Number 5.4.5 With Annex B.2 Negation Symbol], The Vendor Must Provide A Signed Letter Stating That The Offered Products Are "not Made With Natural Rubber Latex."
7. Vendor Must Provide Chlorhexidine Gluconate (chg) Applicator, Procedural Products That Meet Fda General Controls And Special Controls As Applicable And Submit Supporting Documentation With Initial Submittal To Include Fda Establishment Registration, Medical Device Listing, And 510(k) As Applicable.
8. Vendor Must Provide Chlorhexidine Gluconate (chg) Applicator, Procedural Products That Have An Approved New Drug Application (nda) By The Fda And Submit Supporting Documentation With Initial Submittal.
9. Vendor Must Provide Chlorhexidine Gluconate (chg) Applicator, Procedural Products Where Both Applicator And Solution Are Sterile And Provide Documentation To Support With Initial Submittal.
10. Vendor Must Provide Chlorhexidine Gluconate (chg) Applicator, Procedural Products With No Additional Active Ingredients, Other Than 2% Chlorhexidine Gluconate (chg) And 70% Isopropyl Alcohol (ipa) And Provide Documentation To Support This With Initial Submittal.
11. Vendor Must Provide Chlorhexidine Gluconate (chg) Applicator, Procedural Products With A Safety Data Sheet (sds) For The Products Being Offered And Provide Documentation To Support This With Initial Submittal.
12. Vendor Must Provide Chlorhexidine Gluconate (chg) Applicator, Procedural Products With The Following Information On Individual Product Packaging Or On A Package Insert And Provide Documentation To Support With Initial Submittal.
A. Product Directions For Use
B. Maximal Coverage Area For One Applicator
C. Air Drying Time Instructions
D. Warning For Use On Infants
vendor Instructions: In Support Of Requirement 13 And 14, Vendor Must Provide With Initial Submittal Photographic Images Of The Individual And External Product Packaging For Required Item 5.2. Photographic Images Of Graphic Templates Of Product Labeling Are Not Acceptable Supporting Documentation. Vendor Must Provide A Letter Of Attestation, Including The Part Numbers, For Required Items 5.1, 5.3, And 5.4, Stating That The Offered Products Meet Requirements 13 And 14.
13. Vendor Must Provide Chlorhexidine Gluconate (chg) Applicator, Procedural Products With Individual Packaging That Includes The Following Information:
A. Expiration Date As Indicated Per 21 Cfr 201.66
B. Lot Number As Indicated Per 21 Cfr 201.66
C. Single-use As Indicated Per 21 Cfr 201.66
D. Sterile As Indicated Per 21 Cfr 201.66
E. Flammability Warning, With Appropriate Flammability Signal Word(s) As Per 21 Cfr 201.66(c)(5)(ii)(c)
14. Vendor Must Provide Chlorhexidine Gluconate (chg) Applicator, Procedural Products With External Product Packaging (i.e. Box) That Includes The Following Information:
A. Flammability Warning, With Appropriate Flammability Signal Word(s) As Per Cfr 201.66(c)(5)(ii)(c).
evaluations
evaluations For This Product Line Will Be Done By A Panel Of Experts As A Technical Review To Determine Which Vendors Meet The Requirements. Vendors Who Provide All Requested Information And Meet The Requirements Will Be Selected For Inclusion On The Qsl. Vendors Will Be Notified Of Whether They Met Or Did Not Meet The Qsl Requirements By Approximately 07 February 2025.
response Information:
responses To This Qsl Announcement Must Be Submitted Via Email To The Mmeso Clinical Analyst, Mmeso Project Manager, And Dla Ko Listed Below.
vendor Questions Regarding This Qsl Announcement Are Due No Later Than 5:00 Pm Local Philadelphia Time 2 Business Days Before Solicitation Closes. Vendor Responses To This Qsl Announcement Are Due No Later Than 5:00 Pm Local Philadelphia Time On 09 January 2025.
all Vendor Correspondence Should Be Emailed To All Of The Following:
ms. Andrea Honesto
lead Mmeso Clinical Analyst Contractor
andrea.l.honesto.ctr@health.mil
mr. David Sheaffer
mmeso Project Manager Contractor
david.v.sheaffer.ctr@health.mil
ms. Tara Perrien
dla Troop Support Medical Contracting Officer
tara.perrien@dla.mil
the Contracting Officer Will Address Any Issues/questions Pertaining To Incentive Agreements, Taa Questions, And Extension Requests.
Closing Date9 Jan 2025
Tender AmountRefer Documents
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+2Civil Works Others, Security and Emergency Services
United States
Details: Page 1 Of 11 Page 1 Of 14 Page 15 Of 16 Page 1 Of Page 1 Of Description This Is A Combined Synopsis Solicitation (css) For Commercial Services Prepared In Accordance With The Format In Far Subpart 12.6, Streamlined Procedures For Evaluation And Solicitation For Commercial Products And Commercial Services., Using Simplified Acquisition Procedures Found At Far Part 13 And As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued. This Solicitation Number 36c24425q0194 Is Being Issued As A Request For Quote (rfq). The Government Anticipates Awarding One, One-year Period Of Performance, Firm-fixed-price Contract Resulting From This Solicitation For The Repairs Specified Only. This Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular (fac) 2024-07 (effective Date 08/29/2024) And Can Be Found At: Far | Acquisition.gov . The Associated North American Industrial Classification System (naics) Code For This Procurement Is 238310 With A Small Business Size Standard Of $19.0 Million And The Product/service Code Is: H912 This Solicitation Is A Service Disabled Veteran Owned Small Business Set-aside. â This Solicitation Requires Registration With The System For Award Management (sam) Prior To Award, Pursuant To Applicable Regulations And Guidelines. Registration Information Is At: Http://www.sam.gov . Confirmation Of Sam Registration Will Be Validated Prior To Awarding A Contract.â â The Veterans Integrated Service Network 04 (visn4), Has A New Requirement For Fire Barrier Repair Services At The Wilkes-barre Va Medical Center As Listed In The Statement Of Work (sow), Attachment A.ââ â The Contractor Shall Provide All Necessary Requirements Cited In The Sow. All Work Is To Be Performed In Accordance With Applicable Federal, State, And Local Regulations Or Ordinances. All Interested Offerors Shall Provide A Quotation For The Following: Pricing Schedule, Attachment B. Place Of Performance: Wilkes-barre Vamc. Visn-04 Intends To Award One-year Contract With A Period Of Performance Of Approximately: 1/10/2025-1/9/2026. A Complete Description Of The Services To Be Acquired, And/or Applicable Government Need(s) Are As Follows: See Attachment A: Statement Of Work. Contracting Office Address: Department Of Veterans Affairs Regional Procurement Office East Network Contracting Office 4 (nco 4) Va Pittsburgh Medical Center 1010 Delafield Rd., Pittsburgh, Pa 15215 Contract Specialist: Andrew Chmielewski 52.212-4, Contract Terms And Conditions - Commercial Products And Commercial Services (nov 2023) 52.252-2 Clauses Incorporated By Reference (feb 1998) This Contract Incorporates One Or More Clauses By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. Also, The Full Text Of A Clause May Be Accessed Electronically At This/these Address(es): Http://www.acquisition.gov/far/index.html Http://www.va.gov/oal/library/vaar/ (end Of Clause) Far Number Title Date 52.203-17 Contractor Employee Whistleblower Rights And Requirement To Inform Employees Of Whistleblower Rights Nov 2023 52.204-9 52.204-13 Personal Identity Verification Of Contractor Personnel System For Award Management Maintenance Jan 2011 Oct 2018 52.204-18 Commercial And Government Entity Code Maintenance Aug 2020 52.232-40 Providing Accelerated Payments To Small Business Subcontractors Mar 2023 Far 52.237-2 Protection Of Government Buildings, Equipment, And Vegetationâ(apr 1984) The Contractorâshallâuse Reasonable Care To Avoid Damaging Existing Buildings, Equipment, And Vegetation On The Government Installation. If The Contractor S Failure To Use Reasonable Care Causes Damage To Any Of This Property, The Contractorâshallâreplace Or Repair The Damage At No Expense To The Government As Theâcontracting Officerâdirects. If The Contractor Fails Or Refuses To Make Such Repair Or Replacement, The Contractorâshallâbe Liable For The Cost, Whichâmayâbe Deducted From The Contract Price. (end Of Clause) Vaar 852.203-70 Commercial Advertising (may 2018) Vaar 852.219-75 Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction (jan 2023) (deviation) (a) Pursuant To 38 U.s.c. 8127(l)(2), The Offeror Certifies That (1) If Awarded A Contract (see Far 2.101 Definition), It Will Comply With The Limitations On Subcontracting Requirement As Provided In The Solicitation And The Resultant Contract, As Follows: (i) Services. In The Case Of A Contract For Services (except Construction), The Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To It To Firms That Are Not Certified Sdvosbs Listed In The Sba Certification Database As Set Forth In 852.219 73 Or Certified Vosbs Listed In The Sba Certification Database As Set Forth In 852.219 74. Any Work That A Similarly Situated Certified Sdvosb/vosb Subcontractor Further Subcontracts Will Count Towards The 50% Subcontract Amount That Cannot Be Exceeded. Other Direct Costs May Be Excluded To The Extent They Are Not The Principal Purpose Of The Acquisition And Small Business Concerns Do Not Provide The Service As Set Forth In 13 Cfr 125.6. (2) The Offeror Acknowledges That This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States. The Offeror Further Acknowledges That This Certification Is Subject To Title 18, United States Code, Section 1001, And, As Such, A False, Fictitious, Or Fraudulent Certification May Render The Offeror Subject To Criminal, Civil, Or Administrative Penalties, Including Prosecution. (3) If Va Determines That An Sdvosb/ Vosb Awarded A Contract Pursuant To 38 U.s.c. 8127 Did Not Act In Good Faith, Such Sdvosb/vosb Shall Be Subject To Any Or All Of The Following: (i) Referral To The Va Suspension And Debarment Committee; (ii) A Fine Under Section 16(g)(1) Of The Small Business Act (15 U.s.c. 645(g)(1)); And (iii) Prosecution For Violating 18 U.s.c. 1001. (b) The Offeror Represents And Understands That By Submission Of Its Offer And Award Of A Contract It May Be Required To Provide Copies Of Documents Or Records To Va That Va May Review To Determine Whether The Offeror Complied With The Limitations On Subcontracting Requirement Specified In The Contract. Contracting Officers May, At Their Discretion, Require The Contractor To Demonstrate Its Compliance With The Limitations On Subcontracting At Any Time During Performance And Upon Completion Of A Contract If The Information Regarding Such Compliance Is Not Already Available To The Contracting Officer. Evidence Of Compliance Includes, But Is Not Limited To, Invoices, Copies Of Subcontracts, Or A List Of The Value Of Tasks Performed. (c) The Offeror Further Agrees To Cooperate Fully And Make Available Any Documents Or Records As May Be Required To Enable Va To Determine Compliance With The Limitations On Subcontracting Requirement. The Offeror Understands That Failure To Provide Documents As Requested By Va May Result In Remedial Action As The Government Deems Appropriate. (d) Offeror Completed Certification/fill-in Required. The Formal Certification Must Be Completed, Signed And Returned With The Offeror S Bid, Quotation, Or Proposal. The Government Will Not Consider Offers For Award From Offerors That Do Not Provide The Certification, And All Such Responses Will Be Deemed Ineligible For Evaluation And Award. Certification I Hereby Certify That If Awarded The Contract, [insert Name Of Offeror] Will Comply With The Limitations On Subcontracting Specified In This Clause And In The Resultant Contract. I Further Certify That I Am Authorized To Execute This Certification On Behalf Of [insert Name Of Offeror]. Printed Name Of Signee: ___________ Printed Title Of Signee: _____________ Signature: ____________ Date: ______________ Company Name And Address: _______________ (end Clause) Vaar 852.232-72 Electronic Submission Of Payment Requests (nov 2018) Vaar 852.242-71 Administrative Contracting Officer (oct 2020) Far 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders-commercial Products And Commercial Services (may 2024). The Following Subparagraphs Are Applicable: Subparagraph (b)(5), (b)(9), (b)(11), (b)(12), (b)(23), (b)(25), (b)(26), (b)(31), (b)(32), (b)(33), (b)(34), (b)(35), (b)(36), (b)(37), (b)(39), (b)(46), (b)(51), (b)(55), (b)(56), (b)(59). Subparagraph (c)(1), (c)(2) Class 25190/ Monetary Wage-fringe Benefits $34.69, (c)(7), (c)(8). The Following Solicitation Provisions Apply To This Acquisition And May Be Incorporated By Reference: 52.252-1 Solicitation Provisions Incorporated By Reference (feb 1998) This Solicitation Incorporates One Or More Solicitation Provisions By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. The Offeror Is Cautioned That The Listed Provisions May Include Blocks That Must Be Completed By The Offeror And Submitted With Its Quotation Or Offer. In Lieu Of Submitting The Full Text Of Those Provisions, The Offeror May Identify The Provision By Paragraph Identifier And Provide The Appropriate Information With Its Quotation Or Offer. Also, The Full Text Of A Solicitation Provision May Be Accessed Electronically At This/these Address(es): Http://www.acquisition.gov/far/index.html Http://www.va.gov/oal/library/vaar/ (end Of Provision) Far Number Title Date 52.204-7 System For Award Management Oct 2018 52.204-16 Commercial And Government Entity Code Reporting Aug 2020 52.229-11 Tax On Certain Foreign Procurements Notice And Representation Jun 2020 852.233-70 852.239-75 Protest Content/alternative Dispute Resolution Information And Communication Technology Accessibility Notice Oct 2018 Feb 2023 52.204-24 Representation Regarding Certain Telecommunications And Video Surveillance (nov 2021) 52.216-1 Type Of Contract (apr 1984) The Government Contemplates Award Of A Firm-fixed-price, Single Period Of Performance Contract Resulting From This Solicitation. 52.233-2 Service Of Protest (sep 2006) Notify The Following: Nicholas Guzenski Through Va Email: Nicholas.guzenski@va.gov 852.233 70, Protest Content/alternative Dispute Resolution (oct 2018) (end Of Clause) Addendum To Far 52.212-1 Instructions To Offerors-commercial Products And Commercial Services: Any Questions Or Concerns Regarding This Solicitation Should Be Forwarded In Writing Via E-mail To The Point Of Contact Listed Below. Quotes In Response To This Rfq Are Due On 2:00 Pm (est), Monday, December 30, 2024. Quotes Shall Be Submitted In Writing And Sent Via Email To Contracting Specialist: Andrew Chmielewski; Andrew.chmielewski@va.gov. Please Insert Solicitation Number 36c24425q0194 Wilkes-barre Fire Barrier Repair Services In The Subject Line Of Your Email. All Submissions Shall Be 5mb Or Less. If The Email Is More Than 5mb, Submit Multiple Emails Labeling Them 1 Of Xx, 2 Of Xx, Etc. Late Submissions Shall Be Treated In Accordance With The Solicitation Provision At Far 52.212-1(f). Any Questions Or Concerns Regarding This Solicitation Shall Be Forwarded In Writing Via Email To The Contracting Specialist By 2:00 Pm Est, Thursday December 26, 2024. Questions Will Not Be Accepted After This Date. Responses To The Offeror S Question(s) Will Be Posted Via An Amendment On Sam.gov / Contract Opportunities Via: Http://www.sam.gov Failure To Follow All Instructions May Result In Offeror(s)s Being Determined As Non-responsive And Be Removed From This Competition. All Proposals Shall Be Valid 60 Days From The Quote Response Date. Offeror(s)s Are Cautioned To Be Responsive To All Requirements In The Sow And To Provide Sufficient Information To Allow For Evaluation Of The Quotes. Offeror S Are Required To Submit The Following: Attachment B: Price Schedule: Please Complete Price Information In The Last Two Columns Of Attachment B And Return With Your Quote. To Facilitate The Award Process, All Quotes Shall Include A Statement Regarding The Terms And Conditions Herein As Follows: "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document Without Modification, Deletion, Or Addition." Or "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document With The Exception, Deletion, Or Addition Of The Following:" And A Statement To Acknowledge Amendments, If Applicable. Cover Letter. Offeror(s)s Shall Submit A Cover Letter Identifying Their Company Name, Contact Information, Cage Code, Sam Unique Entity Id (uei) Number Of The Prime And Any Teaming Partner/subcontractor. Offeror(s)s Shall Include A Completed Copy Of The Provision 52.212-3 With Their Quote If The Offeror(s) Has Not Completed It Electronically In The System For Award Management (sam), Accessed Via: Http://www.sam.gov Offeror(s)s Shall Submit A Technical Capability Which Shall Address The Following At A Minimum: Staffing/contractor Personnel: Explain Ability To Supply Adequate Staff To Perform Gauge Calibration In Accordance With The Sow. Qualifications: Explain Contractor S Ability To Meet Industry Standards In Accordance With The Sow With Regards To Gauge Calibration. The Contractor Must Include A Signed Copy Of Vaar 852.219-75 Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction. This Shall Be Submitted With The Solicitation Attachments. Addendum To 52.212-2 Evaluation Commercial Products And Commercial Services The Government Will Perform An Evaluation Using A Comparative Evaluation Of Each Quote. The Government Will Compare Quotes To One Another In Order To Select The Quote That Best Benefits The Government. Comparative Evaluation Will Be Conducted In Accordance With Far 13.106-2(b)(3). The Following Factors Shall Be Used To Evaluate Offeror(s)s: 1. Price 2. Technical Capability (b) A Written Notice Of Award Or Acceptance Of A Quote, Mailed Or Otherwise Furnished To The Successful Offeror(s) Within The Time For Acceptance Specified In The Quote, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer's Specified Expiration Time, The Government May Accept A Quote, Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award. The Contracting Officer Will Award One, Firm Fixed Price Contract Resulting From This Rfq To The Responsible Offeror(s) Whose Quote Conforming To The Rfq Is Most Advantageous To The Government. Price The Government Reserves The Right To Award To An Offeror With Other Than The Lowest Price. The Award Will Be Made To The Offeror Whose Quote Represents The Best Overall Value To The Government. Technical The Offeror Clearly Demonstrates In Its Response A Clear Understanding Of All The Government S Requirements And Effective Approach For The Completion Of Service In Accordance With The Sow. Past Performance Offerors Must Have A Record Of Satisfactory Or Neutral Past Performance. If No Record Of Past Performance Is Found, The Offeror Will Receive A Rating Of Neutral. The Government Will Utilize But Is Not Limited To Internal Documentation Including Federal Awardee Performance And Information System (fapiis) For Determining The Past Performance Of Offerors. â Section D - Contract Documents, Exhibits, Or Attachmentsâ â See Attached Document: Attachment A Statement Of Work See Attached Document: Attachment B Price Scheduleââ See Attached Document: Attachment C Wage Determination Point Of Contact Combined Synopsis/solicitation Notice Combined Synopsis/solicitation Notice Page 3 Of 3 Combined Synopsis/solicitation Notice *= Required Field Combined Synopsis/solicitation Notice Page 1 Of 3 Andrew Chmielewski Department Of Veterans Affairs Regional Procurement Office East Network Contracting Office 4 (nco 4) 1010 Delafield Rd., Pittsburgh, Pa 15215 Andrew.chmielewski@va.gov End Of Document
Closing Date3 Jan 2025
Tender AmountRefer Documents
Bureau Of The Treasury Tender
Manpower Supply
Philippines
Details: Description Description : Supply Of Security Services Brief Description : Provision Of Personnel To Perform Security Services To Btr Regional Office Located At Pres. Corazon C. Aquino Regional Government Center, Balintawak, Pagadian City, Zamboanga Del Sur And To The Provincial Offices Of Zamboanga City, Zamboanga Del Norte And Basilan No. Of Days Work : 365 Days Duration Of The Contract : January 01, 2025 To September 30, 2025 Approved Budget For The Contract : Regional Office 2 P 40, 870.00 X 9 Months = P 367, 830.00 Po - Zamboanga City/ Sibugay 1 20,336.00 X 9 Months = 183, 024.00 Po - Zamboanga Del Norte 1 20,336.00 X 9 Months = 183, 024.00 Po - Basilan 1 20,336.00 X 9 Months = 183, 024.00 Total P 101,878.00 P 916,902.00 I. Scope Of Work And Services A. The Security Guard/s Shall Perform The Following: Regional Office - Each Of The Two (2) Security Guards Shall Perform Work Of Eight (8) Hours Per Day, Seven (7) Days A Week Inclusive Of Regular And Special Holidays. Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices - Three (3) Security Guards For The Respective Provincial Offices To Perform Work Of (8) Hours Per Day, Seven (7) Days A Week Inclusive Of Regular And Special Holidays. 1. Safeguard The Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices, Their Attached Structures And Facilities From Fire, Criminal Infiltration, Economic Sabotage, Electronic Attack, Bomb Threats, Flood Damage, Vandalism, And Other Forms Of Physical Destruction. Term Of Reference: Security Agency For Cy 2025 Page 2 Of 9 2. Safeguard The Vehicles, Furniture And Other Materials Against Theft, Robbery, Fire, Arson And Other Form Of Crimes. 3. Safeguard The Btr Personnel, Clients And Visitors Against Harm Or Threats While Within The Offices’ Premises During Official Hours, Including Off-hours Whenever Their Access Are Authorized. 4. Promote And Maintain Peace And Order Within The Premises Of Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices, The Assigned Areas Of Responsibility Including, But Not Limited To, The Designated Restricted And High-risk Areas Within The Premises. 5. Expedite Any And All Activities In Support Of The Mission And Objectives Of The Btr Including All Legal And Lawful Instructions Handed Down By The Higher Authority. 6. Record And Document In The Security Guard’s Logbook Or Journal All Significant Events Occurring In His Area Of Responsibility And/or Report In Writing Any Incident Inimical To The Safety And Integrity Of The Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices. 7. Maintain Proper Decorum, Personal Discipline, Grooming, And Decent Uniform While On Duty And Refrain From Reading Newspapers, Using Cellular Phones And Gadgets, Drinking Alcoholic Beverages, Taking Prohibited Drugs, Or Any Other Activities That Will Cause Distraction In The Proper Performance Of His Duty. 8. Comply With Orders, Circulars, And Other Policies Of The Btr, Including Lawful Orders Of The Regional Director, The Heads Of Provincial Offices, Or Their Authorized Representatives. 9. To Strictly Comply With Republic Act No.5487, As Amended By P.d. 1919, Otherwise Known As The Private Security Law, And Its Implementing Rules And Regulations Issued By The Director General Of The Philippine National Police. Ii. Strategic Areas To Be Covered By Security Services A. Perimeter Area(s); B. All Floors From Ground Floor To Rooftop, Including The Garage And Utility Areas Of The Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices; C. All Property Of The Btr Regional Office And Zamboanga City/ Sibugay, Zamboanga Del Norte And Basilan Provincial Offices, Beginning From Ground Floor To Rooftop. Term Of Reference: Security Agency For Cy 2025 Page 3 Of 9 Iii. Schedule Of Requirements The Following Shall Be Provided By The Contractor: Item No. Qty. Description Bidder’s/supplier’s Compliance 1. *5 Sgs Security Guards Must Be: I. Filipino Male Citizen Ii. Preferably Those Who Have Completed 72 Units In College. Iii. Preferably With Experience In Guarding Government Facility Iv. Able To Communicate In Oral And Written English. V. Physical And Mentally Fit To Perform Security Duty. Vi. 25-45 Years Of Age. Vii. Minimum Height: 5 Ft. And 5 Inches Viii. Undergone Pre-licensing Training Administered Or Authorized By Pnpsosia. (provide Proof Of Training) Ix. Able To Prepare Investigation/spot Reports. X. Passed Np Evaluation And Drug Testing With Proof Of Compliance. Xi. Must Have Undergone Special Trainings On Anti-terrorism; Basic Fire Safety/prevention And Suppression; Basic First Aid And Self-defense Xii. Must Possess A Valid Security License As Of Bidding Date And During Tour Of Duty (submit Copy Of License). Xiii. Must Exhibit Good Moral Character, Honesty, Alertness. Xiv. Must Not Have Been Charged Nor Convicted Of Any Offense Involving Moral Turpitude (submit Appropriate Clearance, Barangay, Police And Nbi). 2 Materials/equipment/supplies To Be Provided By The Contractor, Per Sg: I. Prescribed Basic Uniforms Ii. Nightstick/baton Iii. Whistle Iv. Timepiece V. Writing Pen Term Of Reference: Security Agency For Cy 2025 Page 4 Of 9 Vi. Notebook And Duty Checklist (electronic Or Not) Vii. Flashlight Viii. First Aid Kit Ix. Service Firearms With Full Capacity Ammo. Load Plus Spare (subj. To Compliance With Pnp Guidelines On The Carrying Of Firearms And Ammunitions). X. Metal Detector Xi. Communication Radio (optional) Xii. Raincoat/pontio The Contractor Shall Provide The Abovementioned Security Personnel With Equipment That Should Be 100% Operational At All Times For The Duration Of The Contract. As To The Issued Firearms, They Must Be Of Genuine Brand Acquired From A Legitimate Source(s). No Paltiks Guns. Iv. Technical Specifications Technical Parameters Based On Gppb Circular No. 24-2007 Item No. Description Bidder’s/supplier’s Compliance 1. Stability Of The Company (a) Years Of Experience I. Has Been In The Business For At Least (3) Years; Ii. Has Experience In Providing Security Service (s) To Government Offices And Financial Institution; And, Iii. Bidders Shall Submit Certification Under Oath Of List Of Contracts Completed For The Past Three (3) Years. (b) Liquidity Of The Contractor Submit Audited Financial Statement For Cy 2020-2021 Duly Stamped By Bir Or Its Accredited And Authorized Institution. (c) Organizational Set-up Organizational Capability Of Any Agency Shall Be Based On Its Compliance With Organizational Structure Of Private Security Agencies Prescribed Under R.a. 5487 And Recent Irrs Implementing The Same. - Submission Of Organizational Chart Showing Key Management Personnel Are Themselves Term Of Reference: Security Agency For Cy 2025 Page 5 Of 9 Qualified And Licensed To Operate And Manage Security Business. - At Least (10%) Of Its Security Guard Force Are Currently Deployed On Important Posting Areas (e.g. Vital Installation, Airports, Power Plants, Banks And Similar Financial Institution And Government Offices). 2 Number Of Licensed Firearms - Agency Shall Have A Minimum Number Of Licensed And Serviceable Firearms (cal.38 Or 9mm For Handguns And/or 12 Gauge For Shotguns) Equivalent To 1/3 Of Their Total Number Of Security Guards; And, - Submit List Of Licensed Firearms 3 Other Factors (a) Recruitment And Selection Criteria - Show The Hiring Process For Security Guards And The Different Training Interventions Given To Security Personnel (b) Completeness Of Uniforms And Other Paraphernalia The Following Shall Comprise The Basic Equipment Of A Security Guard While On Duty: I. Prescribed Basic Uniform With Authorized Black Shoes Ii. Nightstick Or Baton Iii. Whistle Iv. Timepiece (synchronized To City Hall Time) V. Writing Pen Vi. Notebook And Duty Checklist (logbook Paginated And Smythe Sewn) Vii. List Of Emergency Numbers Viii. Flashlight Ix. First Aid Kit X. Service Firearms With Holster Xi. Handcuffs Xii. Communication Radio (optional) Xiii. Stun Devices (optional) Xiv. Raincoat/pontio Term Of Reference: Security Agency For Cy 2025 Page 6 Of 9 V. Other Responsibilities Of The Supplier/contractor A. The Supplier/contractor Shall Ensure That Their Assigned Security Guards To Btr Offices Are Physically And Mentally Fit For Duty During The Duration Of The Contract. Btr Reserves The Right To Require The Assigned Guards To Undergo Physical Fitness Test Before And During The Start Of The Contract. B. The Discipline And Administration Of The Security Guards Shall Conform To The Rules And Regulations Of The Contractor And The Btr. The Rules To Be Set By The Supplier/contractor Should Be Approved By Btr. C. The Supplier’s/contractor’s Personnel Rendering Unsatisfactory Performance, Questionable Actuations Or Behavior Including Repeated Violation Of Btr’s Internal Rules And Policies Shall Be Immediately Replaced Upon Receipt Of Written Memorandum From The Btr. On The Other Hand, The Supplier/contractor Shall Not Replace Security Guards To The Btr Without The Prior Approval From Its Management. D. The Supplier/contractor Shall Provide Its Security Personnel Stationed At The Client’s Offices With At Least (1) Unit License 9mm Handgun With Basic Ammunition Load Plus Extra Loaded Magazine; A Stand-by (1) Unit License 12 Gauge Shotgun To Be Issued Only During Extra-ordinary Situations, I.e., Like Existence Of Rebellion, Widespread Violence, Terroristic Attacks And Situations Calling For A More Heightened Alert. E. The Security Guards Of The Supplier/contractor Shall Never Be Employees Of The Btr. Hence, The Latter Shall Not Be Held Responsible For Any Claims For Compensation In The Event Of Injuries And Death Sustained By The Security Guards Or By Any Third Persons In The Performance By The Latter Of Its Duty With Btr. F. The Supplier’s/contractor’s Security Guards Shall Not Be Allowed To Stay In The Building Premises When On “off-duty”, Except During Times Of Emergency Situations. G. The Supplier/contractor Shall Require Its Security Guards Assigned To Their Respective Stations To Render Services In Accordance With The Contract And This Terms Of Reference. Security Guards Are Expected To Be On The Regional Office’ And Provincial Offices’ Premises At Least (30) Minutes Before The Start Of Duty. H. The Supplier/contractor Shall Prepare At Least Two (2) Relievers To Immediately Assume The Duty From Regular Guards In Case Of Their Absence. I. The Supplier/contractor Shall Require Its Security Guards To Render Services Exceeding The Scheduled Working Hours In The Exigencies Of The Service And/or As The Need May Arise. Absent Security Guards Shall Immediately Be Replaced By Relievers. Term Of Reference: Security Agency For Cy 2025 Page 7 Of 9 J. The Supplier/contractor Shall Assume Full Responsibility For Any Liabilities, Cause/s Of Action Or Claims Which May Be Filed By Any Of The Security Guards Under Labor Laws, Employees Compensation Laws Or Other Special Laws, Rules And Regulations Currently Mandated/implemented By The Department Of Labor And Employment. By Virtue Thereof, The Supplier/contractor Shall Render Btr, Its Officers And Employees, Free And Harmless From Any Such Liabilities, Cause Of Action Or Claims. K. The Supplier/contractor Shall Be Responsible For The Loss, Damage Or Injury That May Be Suffered By Btr Or Its Clients, Personnel And Properties, During The Tour Of Duty Of The Assigned Security Guards. Btr Shall Inform The Supplier/contractor In Writing Within Twenty Four (24) Hours From Its Occurrence Or Discovery. It Is Understood That The Contractor Shall Not Be Liable For Loss/es Or Damage/s Incurred By Btr Due To Fortuitous Events Or Force Majeure, Unless Accompanied By Negligent Acts By The Security Guards Or Their Failure To Take Positive Measures To Prevent Such Loss/es Or Damage/s In Line With Established Contractor And Btr Rules And Policies. Further, The Supplier/contractor Guarantees The Full Compensation For Whatever Loss/es Or Damage/s Which Btr May Sustain On The Occasion Of The Fault And Negligence Of Its Security Guards After Due Investigation Is Conducted On The Matter. L. The Supplier Or Contractor Is Obligated To Submit Proof Of Remittance In Compliance With Various Statutory Social Legislation Measures, Including But Not Limited To Contributions To Sss, Pag-ibig, Philhealth, And Ecc, Retirement Benefits For The Retirement Plan Established Or Remittance To Any Institution Responsible For The Administration And Maintenance Of Such Fund. The Supplier/contractor Shall Also Submit The Monthly Proof Of Payment Of The Basic Pay And Other Benefits Paid Directly To The Guards. This Documentation Must Be Provided To The Bureau Of The Treasury (btr) Within Fifteen (15) Days Following The Conclusion Of Each Month. Failure To Submit The Required Proof Of Remittance Shall Be A Ground For The Suspension Of Contract Payments Until Compliance Is Achieved. Additionally, Any Infringement Of These Standards Or Labor Laws May Result And Constitute As A Ground For The Blacklisting Of The Supplier Or Contractor. M. The Supplier/contractor Shall Comply With Existing Labor Standard Laws And Regulations, Especially In The Payment Of Minimum Wage And Other Statutory Benefits Implemented By Dole, Padpao, And The Pnp. N. In Addition, The Supplier/contractor Shall Submit To Btr The Following Upon Submission Of Their Rfq/proposal: 1. Certification Of Good Standing From The Pnp-sosia (formerly Pnp-sagds) And The Philippine Association Of Detective And Protective Agency Operators (padpao). 2. A Certified Copy Of The License To Operate As A Security Agency From The Pnp Term Of Reference: Security Agency For Cy 2025 Page 8 Of 9 3. Business Permit, Philgeps Certificate, Certificate Of Registration (bir), Tax Clearance, Itr (income Tax Return) O. The Supplier Shall Submit The Cost Distribution Schedule Of Security Services Following The Herein Format. Any Other Benefits May Be Added As Long As The Required Items Specifically Listed Below Are Adhered And Compliant With The Approved Budget Contract. Agency Estimate For Security Guards Factor Days 1st Shift 2nd Shift 393.4 414 414 Estimated Equivalent Monthry Rate = Eemr Payable Directly To Security Guards 1.1 Basic Salary Rate ( Monthly ) Sub- Total 1.2 Night Shift Differential ( Note :only 1 Hour Is Alloted For Night Shift Since Duty Is Only Until 11:00 Pm 1.3 13th Month Pay- 1/12 Of Basic Pay 1.4 Service Incentive Leave Pay - 5 Days Per Year (sil) 1.5 Uniform Allowance 1.6 Retirement Benefit Per Month (eemr * 22.5/12) Sub-total (a) Government Payment 1.7 Sss Premium Er Share (based On Table) 1.8 Sss Ec Er Share (based On Table) 1.9 Philhealth Er Share (5% Total, Shared 50:50 By Ee And Er) 1.10 Sif- Er Share 1.11 Pag_ibig Er Share Sub-total (b) Total Payment To Guards + Gov't ( C) 0.00 0.00 Admin Fee (d)= C * ___% 0.00 0.00 Vat- 12% Of Admin Fee (e )= D *12% 0.00 0.00 Total Vat And Admin Fee 0.00 0.00 Total Contract Cost- Monthly (f )= C + D + E 0.00 0.00 Annual Cost (f * 12 Months) 0.00 0.00 Total Annual Cost To Guards [1st Shift: (h * 4 Guards)] Ro + Zambo. City + Zambo. Del Norte + Basilan 0.00 Total Annual Cost To Guards 2nd Shift Of Regional Office Guard With Night Salary Differential 0.00 Term Of Reference: Security Agency For Cy 2025 Page 9 Of 9 Total First And Second Shift 0.00 Vi. Reservation Clause The Btr Reserves The Right To: Reject Documents That Do Not Comply With The Requirements; To Waive Any Formalities And Documents Or Consider Any Submission Of Documents As Substantial Compliance; To Reject Any And All Bids; To Declare A Failure Of Bidding; To Annul The Bidding Process; Or Not To Award The Contract, Without Thereby Incurring Any Liability To The Affected Potential Supplier Or Bidder/s. This Also Includes The Changes In The Funds/allotment Releases For The Said Program/project/activity Affecting The Award Of Contract, Which Are Either Withheld Or Reduced, At No Fault Of The Btr. The Btr Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidder/s Or Potential Supplier/s For Any Expenses Incurred In The Preparation Of The Bid/proposal. Prepared By: Cesar M. Canoog Jr. Administrative Assistant Ii Approved: Albert Jonathan B. Paulino Director Ii Conformed: _________________________________ Signature Over Printed Nam
Closing Date3 Jan 2025
Tender AmountPHP 916.9 K (USD 15.8 K)
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Others
United States
Details: Sources Sought Notice
sources Sought: This Is Not A Solicitation For A Proposal, Proposal Abstract, Or Quote. The Purpose Of This Notice Is To Obtain Information Regarding Qualified Business Sources. The Responses To The Information Requested Will Assist The Government In Determining The Appropriate Acquisition Method.
statement Of Work (sow)
the Contractor Shall Render Genetic Testing Laboratory Services In Accordance With This Statement Of Work To Support The Health Science Research Department At Durham Va Medical Center Under The Direction Of Dr. Deepak Voora, Executive Director Of National Pharmacogenomics Program At Va Central Office, For The Study/iir Titled, Reducing Veterans' Risk Of Atherosclerotic Cardiovascular Disease Through Pharmacogenomics Informed Statin Prescribing Funded By The Va Durham Healthcare System And Delivered To The Indianapolis Va Health Care System.
description: Genomic Medicine Research Has Many Complexities Requiring Specialized Services, Skills, And Expertise, Including Complex Laboratory Analyses Requiring Specialized Equipment And Expertise In The Generation And Interpretation Of Genomic Data; Large Complex Genomic Datasets With Particular Storage, Privacy, And Information Security Requirements; Clinical Expertise In How Genomic Medicine Interventions Might Inform Health Care And Impact Health Outcomes; And Sensitivity To The Ethical, Psychosocial, Legal, And Regulatory Considerations Of Genomic Medicine Research.
background: This Research Grant Proposes A Single Center, Randomized Clinical Trial Of Precision Statin Prescribing Versus Usual Care To Be Conducted At The Indianapolis Va Health Care System. Four-hundred And Ten (410) Veteran Patients Who Are At Risk For Cardiovascular Events And Have A Class I Indication For Statin Therapy, But Are Not Currently Prescribed One, Will Be Recruited And Randomly Allocated To Receive Either 1) Genetic Test Report That Provides An Assessment Of Their Risk For Cardiovascular Disease Events Based On A Polygenic Risk Score (prs) For Coronary Artery Disease And Their Risk Of Statin Associated Musculoskeletal Symptoms Based On Slco1b1 Genetic Testing Or 2) Usual Care. Specimens For Genetic Testing Will Be Collected Via Saliva Kit Administered With The Assistance Of Research Staff And Shipped Using A Common Carrier Delivery Service And Standard Chain Of Custody.
description Of Work: The Contractor S Laboratory Services Shall Be In Accordance With Clinical Laboratory Improvement Amendments (clia) And Be A College Of American Pathologists (cap) Certified Clinical Diagnostic Genetic Testing Laboratory In Order To Successfully Perform The Required Genetic Testing For This Study.
the Performing Laboratory Will Perform Dna Testing For A Prs For Cad And Slco1b1 Based Dna Sequencing, Pcr, Or Array-based Technologies, Analysis, Interpretation, And Reporting For This Study.
the Certification And Accreditation (c&a) Requirements Do Not Apply, And That A Security Accreditation Package Is Not Required.
primary Contractor Duties Include, But Are Not Limited To:
specimen Accessioning, Extraction, And Test Management
dna Sequencing And/or Genotyping For
polygenic Risk Score (prs) For Coronary Artery Disease Cad
genome Wide Genotyping/sequencing
whole Genome Imputation
variant Calling
sample Qc
genetic Variant Qc
ancestry Specific Prs Calculation For Cad
prs Interpretation And Report In Pdf Format
slco1b1 Genetic Testing
genotyping/sequencing
variant Calling
sample/variant Qc
Star Allele Diplotype And Phenotype Interpretation Based On The Clinical Pharmacogenetics Implementation Consortium (cpic) Guidelines.
reporting In Pdf Format
each Laboratory Tests Unit Shall Include:
saliva Swab Dna Collection Kit
genome-wide Genotyping With Illumina Iscan Microarray Technology
whole Genome Imputation
variant Calling
sample Qc (call Rate, Nominal Coverage, Heterozygosity Rate)
genetic Variant Qc (genotype Probability)
ancestry Specific Prs Calculation For Cad Prs
cad Prs Reporting In Pdf Format
slco1b1 Testing And Reporting In Pdf Format
deliverables: Specific Items To Be Delivered To The Va Investigators, Include, But Are Not Limited To:
human Specimen Sample Collection Supplies And Shipping Materials, Compliant With All Current Federal Regulations.
clinical Polygenic Risk Score And Slco1b1 Report For Participants Randomized To The Genetic Testing Arm Of The Study.
a Required Total Of An Estimated 68 Tests Per Year For Three (3) Years.
other Pertinent Information:
the Contractor Shall Provide Services For Both Components Of Necessary Testing: 1. Polygenic Risk Score For Coronary Artery Disease And 2. Slco1b1 Genetic Testing.
the Contractor Shall Provide An Existing Ldt That They Have Available For The Purposes In This Statement Of Work, As Va Does Not Have An Ldt For These Purposes. The Vendor Shall Have An Existing Ldt As The Va Will Use The Ldt Within One Month Of The Contract Being Awarded.
the Contractor Shall Not Work In Conjunction With Another Laboratory For The Polygenic Risk Score Or The Genetic Testing For Slco1b1 As Subcontracting Out And Shipping Samples From One Contractor S Laboratory To Another Is Not Within Best Interest Of The Va S Need At This Time.
the Contractor S Services Shall Be Available Readily To Render To Va, In House, At Time Of Contract Award.
timeframe: The Estimated Beginning And Ending Dates During Which The Contractor Is Required To Perform Work For Va Durham Are 1/13/2025 To 1/12/2026 With The Option To Renew Yearly Through 1/13/2028.
va Information And Information System Security And Privacy Language
1. General. This Entire Section Applies To All Acquisitions Requiring Any Information Security And Privacy Language. Contractors, Contractor Personnel, Subcontractors And Subcontractor Personnel Will Be Subject To The Same Federal Laws, Regulations, Standards, Va Directives And Handbooks, As Va Personnel Regarding Information And Information System Security And Privacy.
2. Va Information Custodial Language. This Entire Section Applies To All Acquisitions Requiring Any Information Security And Privacy Language.
a. The Government Shall Receive Unlimited Rights To Data/intellectual Property First Produced And Delivered In The Performance Of This Contract Or Order (hereinafter Contract ) Unless Expressly Stated Otherwise In This Contract. This Includes All Rights To Source Code And All Documentation Created In Support Thereof. The Primary Clause Used To Define Government And Contractor Data Rights Is Far 52.227-14 Rights In Data General. The Primary Clause Used To Define Computer Software License (not Data/intellectual Property First Produced Under This Contractor Or Order) Is Far 52.227-19, Commercial Computer Software License.
b. Information Made Available To The Contractor By Va For The Performance Or Administration Of This Contract Will Be Used Only For The Purposes Specified In The Service Agreement, Sow, Pws, Pd, And/or Contract. The Contractor Shall Not Use Va Information In Any Other Manner Without Prior Written Approval From A Va Contracting Officer (co). The Primary Clause Used To Define Government And Contractor Data Rights Is Far 52.227-14 Rights In Data General.
c. Va Information Will Not Be Co-mingled With Any Other Data On The Contractor S Information Systems Or Media Storage Systems. The Contractor Shall Ensure Compliance With Federal And Va Requirements Related To Data Protection, Data Encryption, Physical Data Segregation, Logical Data Segregation, Classification Requirements And Media Sanitization.
d. Va Reserves The Right To Conduct Scheduled Or Unscheduled Audits, Assessments, Or Investigations Of Contractor Information Technology (it) Resources To Ensure Information Security Is Compliant With Federal And Va Requirements. The Contractor Shall Provide All Necessary Access To Records (including Electronic And Documentary Materials Related To The Contracts And Subcontracts) And Support (including Access To Contractor And Subcontractor Staff Associated With The Contract) To Va, Va's Office Inspector General (oig), And/or Government Accountability Office (gao) Staff During Periodic Control Assessments, Audits, Or Investigations.
e. The Contractor May Only Use Va Information Within The Terms Of The Contract And Applicable Federal Law, Regulations, And Va Policies. If New Federal Information Security Laws, Regulations Or Va Policies Become Applicable After Execution Of The Contract, The Parties Agree To Negotiate Contract Modification And Adjustment Necessary To Implement The New Laws, Regulations, And/or Policies.
f. The Contractor Shall Not Make Copies Of Va Information Except As Specifically Authorized And Necessary To Perform The Terms Of The Contract. If Copies Are Made For Restoration Purposes, After The Restoration Is Complete, The Copies Shall Be Destroyed In Accordance With Va Directive 6500, Va Cybersecurity Program And Va Information Security Knowledge Service.
g. If A Veterans Health Administration (vha) Contract Is Terminated For Default Or Cause With A Business Associate, The Related Local Business Associate Agreement (baa) Shall Also Be Terminated And Actions Taken In Accordance With Vha Directive 1605.05, Business Associate Agreements. If There Is An Executed National Baa Associated With The Contract, Va Will Determine What Actions Are Appropriate And Notify The Contactor.
h. The Contractor Shall Store And Transmit Va Sensitive Information In An Encrypted Form, Using Va-approved Encryption Tools Which Are, At A Minimum, Federal Information Processing Standards (fips) 140-2, Security Requirements For Cryptographic Modules (or Its Successor) Validated And In Conformance With Va Information Security Knowledge Service Requirements. The Contractor Shall Transmit Va Sensitive Information Using Va Approved Transport Layer Security (tls) Configured With Fips Based Cipher Suites In Conformance With National Institute Of Standards And Technology (nist) 800-52, Guidelines For The Selection, Configuration And Use Of Transport Layer Security (tls) Implementations.
the Contractor S Firewall And Web Services Security Controls, As Applicable, Shall Meet Or Exceed Va S Minimum Requirements.
j. Except For Uses And Disclosures Of Va Information Authorized By This Contract For Performance Of The Contract, The Contractor May Use And Disclose Va Information Only In Two Situations: (i) In Response To A Qualifying Order Of A Court Of Competent Jurisdiction After Notification To Va Co (ii) With Written Approval From The Va Co. The Contractor Shall Refer All Requests For, Demands For Production Of Or Inquiries About, Va Information And Information Systems To The Va Co For Response.
k. Notwithstanding The Provision Above, The Contractor Shall Not Release Va Records Protected By Title 38 U.s.c. § 5705, Confidentiality Of Medical Qualityassurance Records And/or Title 38 U.s.c. § 7332, Confidentiality Of Certain Medical Records Pertaining To Drug Addiction, Sickle Cell Anemia, Alcoholism Or Alcohol Abuse Or Infection With Human Immunodeficiency Virus (hiv). If The Contractor Is In Receipt Of A Court Order Or Other Requests For The Above Mentioned Information, The Contractor Shall Immediately Refer Such Court Order Or Other Requests To The Va Co For Response.
l. Information Made Available To The Contractor By Va For The Performance Or Administration Of This Contract Or Information Developed By The Contractor In Performance Or Administration Of The Contract Will Be Protected And Secured In Accordance With Va Directive 6500 And Identity And Access Management (iam) Security Processes Specified In The Va Information Security Knowledge Service.
m. Any Data Destruction Done On Behalf Of Va By A Contractor Shall Be Done In Accordance With National Archives And Records Administration (nara) Requirements As Outlined In Va Directive 6300, Records And Information Management, Va Handbook 6300.1, Records Management Procedures, And Applicable Va Records Control Schedules.
n. The Contractor Shall Provide Its Plan For Destruction Of All Va Data In Its Possession According To Va Directive 6500 And Nist 800-88, Guidelines For Media Sanitization Prior To Termination Or Completion Of This Contract. If Directed By The Cor/co, The Contractor Shall Return All Federal Records To Va For Disposition.
o. Any Media, Such As Paper, Magnetic Tape, Magnetic Disks, Solid State Devices Or Optical Discs That Is Used To Store, Process, Or Access Va Information That Cannot Be Destroyed Shall Be Returned To Va.the Contractor Shall Hold The Appropriate Material Until Otherwise Directed By The Contracting Officer S Representative (cor) Or Co. Items Shall Be Returned Securely Via Va-approved Methods. Va Sensitive Information Must Be Transmitted Utilizing Va-approved Encryption Tools Which Are Validated Under Fips 140-2 (or Its Successor) And Nist 800-52. If Mailed, The Contractor Shall Send Via A Trackable Method (usps, Ups, Fedex, Etc.) And Immediately Provide The Cor/co With The Tracking Information. Self-certification By The Contractor That The Data Destruction Requirements Above Have Been Met Shall Be Sent To The Cor/co Within 30 Business Days Of Termination Of The Contract.
p. All Electronic Storage Media (hard Drives, Optical Disks, Cds, Back-up Tapes, Etc.) Used To Store, Process Or Access Va Information Will Not Be Returned To The Contractor At The End Of Lease, Loan, Or Trade-in. Exceptions To This Paragraph Will Only Be Granted With The Written Approval Of The Va Co.
3. Access To Va Information And Va Information Systems. This Section Applies When Any Person Requires Access To Information Made Available To The Contractor By Va For The Performance Or Administration Of This Contract Or Information Developed By The Contractor In Performance Or Administration Of The Contract.
a. A Contractor/subcontractor Shall Request Logical (technical) Or Physical Access To Va Information And Va Information Systems For Their Employees And Subcontractors Only To The Extent Necessary To Perform The Services Specified In The Solicitation Or Contract. This Includes Indirect Entities, Both Affiliate Of Contractor/subcontractor And Agent Of Contractor/subcontractor.
b. Contractors And Subcontractors Shall Sign The Va Information Security Rule Of Behavior (rob) Before Access Is Provided To Va Information And Information Systems (see Section 4, Training, Below). The Rob Contains The Minimum User Compliance Requirements And Does Not Supersede Any Policies Of Va Facilities Or Other Agency Components Which Provide Higher Levels Of Protection To Va S Information Or Information Systems. Users Who Require Privileged Access Shall Complete The Va Elevated Privilege Access Request Processes Before Privileged Access Is Granted.
c. All Contractors And Subcontractors Working With Va Information Are Subject To The Same Security Investigative And Clearance Requirements As Those Of Va Appointees Or Employees Who Have Access To The Same Types Of Information. The Level And Process Of Background Security Investigations For Contractors Shall Be In Accordance With Va Directive And Handbook 0710, Personnel Suitability And Security Program. The Office Of Human Resources And Administration/operations, Security And Preparedness (hra/osp) Is Responsible For These Policies And Procedures. Contract Personnel Who Require Access To Classified Information Or Information Systems Shall Have An Appropriate Security Clearance. Verification Of A Security Clearance Shall Be Processed Through The Special Security Officer Located In Hra/osp. Contractors Shall Conform To All Requirements Stated In The National Industrial Security Program Operating Manual (nispom).
d. All Contractors And Subcontractors Shall Comply With Conditions Specified In Vaar 852.204-71(d); Contractor Operations Required To Be In United States. All Contractors And Subcontractors Working With Va Information Must Be Permanently Located Within A Jurisdiction Subject To The Law Of The United States Or Its Territories To The Maximum Extent Feasible. If Services Are Proposed To Be Performed Abroad The Contractor Must State Where All Non-u.s. Services Are Provided. The Contractor Shall Deliver To Va A Detailed Plan Specifically Addressing Communications, Personnel Control, Data Protection And Potential Legal Issues. The Plan Shall Be Approved By The Cor/co In Writing Prior To Access Being Granted.
e. The Contractor Shall Notify The Cor/co In Writing Immediately (no Later Than 24 Hours) After Personnel Separation Or Occurrence Of Other Causes. Causes May Include The Following:
(1) Contractor/subcontractor Personnel No Longer Has A Need For Access To Va Information Or Va Information Systems.
(2) Contractor/subcontractor Personnel Are Terminated, Suspended, Or Otherwise Has Their Work On A Va Project Discontinued For Any Reason.
(3) Contractor Believes Their Own Personnel Or Subcontractor Personnel May Pose A Threat To Their Company S Working Environment Or To Any Companyowned Property. This Includes Contractor-owned Assets, Buildings, Confidential Data, Customers, Employees, Networks, Systems, Trade Secrets And/or Va Data.
(4) Any Previously Undisclosed Changes To Contractor/subcontractor Background History Are Brought To Light, Including But Not Limited To Changes To Background Investigation Or Employee Record.
(5) Contractor/subcontractor Personnel Have Their Authorization To Work In The United States Revoked.
(6) Agreement By Which Contractor Provides Products And Services To Va Has Either Been Fulfilled Or Terminated, Such That Va Can Cut Off Electronic And/or Physical Access For Contractor Personnel.
f. In Such Cases Of Contract Fulfillment, Termination, Or Other Causes; The Contractor Shall Take The Necessary Measures To Immediately Revoke Access To Va Network, Property, Information, And Information Systems (logical And Physical) By Contractor/subcontractor Personnel. These Measures Include (but Are Not Limited To): Removing And Then Securing Personal Identity Verification (piv) Badges And Piv Interoperable (piv-i) Access Badges, Va-issued Photo Badges, Credentials For Va Facilities And Devices, Va-issued Laptops, And Authentication Tokens. Contractors Shall Notify The Appropriate Va Cor/co Immediately To Initiate Access Removal.
g. Contractors/subcontractors Who No Longer Require Va Accesses Will Return Vaissued Property To Va. This Property Includes (but Is Not Limited To): Documents, Electronic Equipment, Keys, And Parking Passes. Piv And Piv-i Access Badges Shall Be Returned To The Nearest Va Piv Badge Issuance Office. Once They Have Had Access To Va Information, Information Systems, Networks And Va Property In Their Possessions Removed, Contractors Shall Notify The Appropriate Va Cor/co.
4. Training. This Entire Section Applies To All Acquisitions Which Include Section 3.
a. All Contractors And Subcontractors Requiring Access To Va Information And Va Information Systems Shall Successfully Complete The Following Before Being Granted Access To Va Information And Its Systems:
(1) Va Privacy And Information Security Awareness And Rules Of Behavior Course (talent Management System (tms) #10176) Initially And Annually Thereafter.
(2) Sign And Acknowledge (electronically Through Tms #10176) Understanding Of And Responsibilities For Compliance With The Organizational Rules Of Behavior, Relating To Access To Va Information And Information Systems Initially And Annually Thereafter; And
(3) Successfully Complete Any Additional Cyber Security Or Privacy Training, As
required For Va Personnel With Equivalent Information System Or Information Access [to Be Defined By The Va Program Official And Provided To The Va Co For Inclusion In The Solicitation Document I.e., Any Rolebased Information Security Training].
b. The Contractor Shall Provide To The Cor/co A Copy Of The Training Certificates And Certification Of Signing The Organizational Rules Of Behavior For Each Applicable Employee Within Five Days Of The Initiation Of The Contract And Annually Thereafter, As Required.
c. Failure To Complete The Mandatory Annual Training Is Grounds For Suspension Or Termination Of All Physical Or Electronic Access Privileges And Removal From Work On The Contract Until Such Time As The Required Training Is Complete.
5. Security Incident Investigation. This Entire Section Applies To All Acquisitions Requiring Any Information Security And Privacy Language.
a. The Contractor, Subcontractor, Their Employees, Or Business Associates Shall Immediately (within One Hour) Report Suspected Security / Privacy Incidents To The Va Oit S Enterprise Service Desk (esd) By Calling (855) 673-4357 (tty: 711). The Esd Is Oit S 24/7/365 Single Point Of Contact For It-related Issues. After Reporting To The Esd, The Contractor, Subcontractor, Their Employees, Or Business Associates Shall, Within One Hour, Provide The Cor/co The Incident Number Received From The Esd.
b. To The Extent Known By The Contractor/subcontractor, The Contractor/ Subcontractor's Notice To Va Shall Identify The Information Involved And The Circumstances Surrounding The Incident, Including The Following:
(1) The Date And Time (or Approximation Of) The Security Incident Occurred.
(2) The Names Of Individuals Involved (when Applicable).
(3) The Physical And Logical (if Applicable) Location Of The Incident.
(4) Why The Security Incident Took Place (i.e., Catalyst For The Failure).
(5) The Amount Of Data Belonging To Va Believed To Have Been Compromised.
(6) The Remediation Measures The Contractor Is Taking To Ensure No Future Incidents Of A Similar Nature.
c. After The Contractor Has Provided The Initial Detailed Incident Summary To Va, They Will Continue To Provide Written Updates On Any New And Relevant Circumstances Or Facts They Discover. The Contractor, Subcontractor, And Their Employes Shall Fully Cooperate With Va Or Third-party Entity Performing An Independent Risk Analysis On Behalf Of Va. Failure To Cooperate May Be Deemed A Material Breach And Grounds For Contract Termination.
d. Va It Contractors Shall Follow Va Handbook 6500, Risk Management Framework For Va Information Systems Va Information Security Program, And Va Information Security Knowledge Service Guidance For Implementing An Incident Response Plan Or Integrating With An Existing Va Implementation.
e. In Instances Of Theft Or Break-in Or Other Criminal Activity, The Contractor/subcontractor Must Concurrently Report The Incident To The Appropriate Law Enforcement Entity (or Entities) Of Jurisdiction, Including The Va Oig, And The Va Office Of Security And Law Enforcement. The Contractor, Its Employees, And Its Subcontractors And Their Employees Shall Cooperate With Va And Any Law Enforcement Authority Responsible For The Investigation And Prosecution Of Any Possible Criminal Law Violation(s) Associated With Any Incident. The Contractor/subcontractor Shall Cooperate With Va In Any Civil Litigation To Recover Va Information, Obtain Monetary Or Other Compensation From A Third Party For Damages Arising From Any Incident, Or Obtain Injunctive Relief Against Any Third Party Arising From, Or Related To, The Incident.
f. The Contractor Shall Comply With Va Handbook 6500.2, Management Of Breaches Involving Sensitive Personal Information, Which Establishes The Breach Management Policies And Assigns Responsibilities For The Oversight, Management And Reporting Procedures Associated With Managing Of Breaches.
g. With Respect To Unsecured Protected Health Information (phi), The Contractor Is Deemed To Have Discovered A Data Breach When The Contractor Knew Or Should Have Known Of Breach Of Such Information. When A Business Associate Is Part Of Vha Contract, Notification To The Covered Entity (vha) Shall Be Made In Accordance With The Executed Baa.
h. If The Contractor Or Any Of Its Agents Fails To Protect Va Sensitive Personal Information Or Otherwise Engages In Conduct Which Results In A Data Breach Involving Any Va Sensitive Personal Information The Contractor/subcontractor Processes Or Maintains Under The Contract; The Contractor Shall Pay Liquidated Damages To The Va As Set Forth In Clause 852.211-76, Liquidated Damages Reimbursement For Data Breach Costs
6. Information System Design And Development. This Entire Section Applies To Information Systems, Systems, Major Applications, Minor Applications, Enclaves, And Platform Information Technologies (to Include The Subcomponents Of Each) Designed Or Developed For Or On Behalf Of Va By Any Non-va Entity.
a. Information Systems Designed Or Developed On Behalf Of Va At Non-va Facilities Shall Comply With All Applicable Federal Law, Regulations, And Va Policies. This Includes Standards For The Protection Of Electronic Protected Health Information (phi), Outlined In 45 C.f.r. Part 164, Subpart C And Information And System Security Categorization Level Designations In Accordance With Fips 199, Standards For Security Categorization Of Federal Information And Information Systems And Fips 200, Minimum Security Requirements For Federal Information Systems. Baseline Security Controls Shall Be Implemented Commensurate With The Fips 199 System Security Categorization (reference Va Handbook 6500 And Va Trusted Internet Connections (tic) Architecture).
b. Contracted New Developments Require Creation, Testing, Evaluation, And Authorization In Compliance With Va Assessment And Authorization (a&a) Processes In Va Handbook 6500 And Va Information Security Knowledge Service To Obtain An Authority To Operate (ato). Va Directive 6517, Risk Management Framework For Cloud Computing Services, Provides The Security And Privacy Requirements For Cloud Environments.
c. Va It Contractors, Subcontractors And Third-party Service Providers Shall Address And/or Integrate Applicable Va Handbook 6500, Va Handbook 6517, Risk Management Framework For Cloud Computing Services And Information Security Knowledge Service Specifications In Delivered It Systems/solutions, Products And/or Services. If Systems/solutions, Products And/or Services Do Not Directly Match Va Security Requirements, The Contractor Shall Work Though The Cor/co To Identify The Va Organization Responsible For Governance Or Resolution. Contractors Shall Comply With Far 39.1, Specifically The Prohibitions Referenced.
d. The Contractor (including Producers And Resellers) Shall Comply With Office Of Management And Budget (omb) M-22-18 And M-23-16 When Using Third-party Software On Va Information Systems Or Otherwise Affecting The Va Information. This Includes New Software Purchases And Software Renewals For Software Developed Or Modified By Major Version Change After The Issuance Date Of M22-18 (september 14, 2022). The Term Software Includes Firmware, Operating Systems, Applications And Application Services (e.g., Cloud-based Software), As Well As Products Containing Software. The Contractor Shall Provide A Self Attestation That Secure Software Development Practices Are Utilized As Outlined By Executive Order (eo)14028 And Nist Guidance. A Third-party Assessment Provided By Either A Certified Federal Risk And Authorization Management Program (fedramp) Third Party Assessor Organization (3pao) Or One Approved By The Agency Will Be Acceptable In Lieu Of A Software Producer's Self Attestation.
e. The Contractor Shall Ensure All Delivered Applications, Systems And Information Systems Are Compliant With Homeland Security Presidential Directive (hspd) 12 And Va Identity And Access Management (iam) Enterprise Identity Management Requirements As Set Forth In Omb M-19-17, M-05-24, Fips 201-3, Personal Identity Verification (piv) Of Federal Employees And Contractors (or Its Successor), M-21-31 And Supporting Nist Guidance. This Applies To Commercial Off-the-shelf (cots) Product(s) That The Contractor Did Not Develop, All Software Configurations And All Customizations.
f. The Contractor Shall Ensure All Contractor Delivered Applications And Systems Provide User Authentication Services Compliant With Va Handbook 6500, Va Information Security Knowledge Service, Iam Enterprise Requirements And Nist 800-63, Digital Identity Guidelines, For Direct, Assertion-based Authentication And/or Trust-based Authentication, As Determined By The Design And Integration Patterns. Direct Authentication At A Minimum Must Include Public Key Infrastructure (pki) Based Authentication Supportive Of Piv And/or Common Access Card (cac), As Determined By The Business Need And Compliance With Va Information Security Knowledge Service Specifications.
g. The Contractor Shall Use Va Authorized Technical Security Baseline Configurations And Certify To The Cor That Applications Are Fully Functional And Operate Correctly As Intended On Systems In Compliance With Va Baselines Prior To Acceptance Or Connection Into An Authorized Va Computing Environment. If The Defense Information Systems Agency (disa) Has Created A Security Technical Implementation Guide (stig) For The Technology, The Contractor May Configure To Comply With That Stig. If Va Determines A New Or Updated Va Configuration Baseline Needs To Be Created, The Contractor Shall Provide Required Technical Support To Develop The Configuration Settings. Far 39.1 Requires The Population Of Operating Systems And Applications Includes All Listed On The Nist National Checklist Program Checklist Repository.
h. The Standard Installation, Operation, Maintenance, Updating And Patching Of Software Shall Not Alter The Configuration Settings From Va Approved Baseline Configuration. Software Developed For Va Must Be Compatible With Va Enterprise Installer Services And Install To The Default Program Files Directory With Silently Install And Uninstall. The Contractor Shall Perform Testing Of All Updates And Patching Prior To Implementation On Va Systems.
i. Applications Designed For Normal End Users Will Run In The Standard User Context Without Elevated System Administration Privileges.
j. The Contractor-delivered Solutions Shall Reside On Va Approved Operating Systems. Exceptions To This Will Only Be Granted With The Written Approval Of The Cor/co.
k. The Contractor Shall Design, Develop, And Implement Security And Privacy Controls In Accordance With The Provisions Of Va Security System Development Life Cycle Outlined In Nist 800-37, Risk Management Framework For Information Systems And Organizations: A System Life Cycle Approach For Security And Privacy, Va Directive And Handbook 6500, And Va Handbook 6517.
l. The Contractor Shall Comply With The Privacy Act Of1974 (the Act), Far 52.224-2 Privacy Act, And Va Rules And Regulations Issued Under The Act In The Design, Development, Or Operation Of Any System Of Records On Individuals To Accomplish A Va Function.
m. The Contractor Shall Ensure The Security Of All Procured Or Developed Information Systems, Systems, Major Applications, Minor Applications, Enclaves And Platform Information Technologies, Including Their Subcomponents (hereinafter Referred To As Information Systems ) Throughout The Life Of This Contract And Any Extension, Warranty, Or Maintenance Periods. This Includes Security Configurations, Workarounds, Patches, Hotfixes, Upgrades, Replacements And Any Physical Components Which May Be Necessary To Remediate All Security Vulnerabilities Published Or Known To The Contractor Anywhere In The Information Systems (including Systems, Operating Systems, Products, Hardware, Software, Applications And Firmware). The Contractor Shall Ensure Security Fixes Do Not Negatively Impact The Information Systems.
n. When The Contractor Is Responsible For Operations Or Maintenance Of The Systems, The Contractor Shall Apply The Security Fixes Within The Timeframe Specified By The Associated Controls On The Va Information Security Knowledge Service. When Security Fixes Involve Installing Third Party Patches (such As Microsoft Os Patches Or Adobe Acrobat), The Contractor Shall Provide Written Notice To The Va Cor/co That The Patch Has Been Validated As To Not Affecting The Systems Within 10 Business Days.
7. Information System Hosting, Operation, Maintenance Or Use.
this Entire Section Applies To Information Systems, Systems, Major Applications, Minor Applications, Enclaves, And Platform Information Technologies (cloud And Noncloud) Hosted, Operated, Maintained, Or Used On Behalf Of Va At Non-va Facilities.
a. The Contractor Shall Comply With All Federal Laws, Regulations, And Va Policies For Information Systems (cloud And Non-cloud) That Are Hosted, Operated, Maintained, Or Used On Behalf Of Va At Non-va Facilities. Security Controls For Collecting, Processing, Transmitting, And Storing Of Va Sensitive Information, Must Be In Place. The Controls Will Be Tested By Va Or A Va Sanctioned 3paoand Approved By Va Prior To Hosting, Operation, Maintenance Or Use Of The Information System Or Systems By Or On Behalf Of Va. This Includes Conducting Compliance Risk Assessments, Security Architecture Analysis, Routine Vulnerability Scanning, System Patching, Change Management Procedures And The Completion Of An Acceptable Contingency Plan For Each System. The Contractor S Security Control Procedures Shall Be The Same As Procedures Used To Secure Va-operated Information Systems.
b. Outsourcing (contractor Facility, Equipment, Or Staff) Of Systems Or Network Operations, Telecommunications Services Or Other Managed Services Require Assessment And Authorization (a&a) Of The Contractor S Systems In Accordance With Va Handbook 6500 As Specified In Va Information Security Knowledge Service. Major Changes To The A&a Package May Require Reviewing And Updating All The Documentation Associated With The Change. The Contractor S Cloud Computing Systems Shall Comply With Fedramp And Va Directive 6517 Requirements.
c. The Contractor Shall Return All Electronic Storage Media (hard Drives, Optical Disks, Cds, Back-up Tapes, Etc.) On Non-va Leased Or Non-va Owned It Equipment Used To Store, Process Or Access Va Information To Va In Accordance With A&a Package Requirements. This Applies When The Contract Is Terminated Or Completed And Prior To Disposal Of Media. The Contractor Shall Provide Its Plan For Destruction Of All Va Data In Its Possession According To Va Information Security Knowledge Service Requirements And Nist 800-88. The Contractor Shall Send A Self-certification That The Data Destruction Requirements Above Have Been Met To The Cor/co Within 30 Business Days Of Termination Of The Contract.
d. All External Internet Connections To Va Network Involving Va Information Must Be In Accordance With Va Trusted Internet Connection (tic) Reference Architecture And Va Directive And Handbook 6513, Secure External Connections And Reviewed And Approved By Va Prior To Implementation. Government-owned Contractor-operated Systems, Third Party Or Business Partner Networks Require A Memorandum Of Understanding (mou) And Interconnection Security Agreements (isa).
e. Contractor Procedures Shall Be Subject To Periodic, Announced, Or Unannounced Assessments By Va Officials, The Oig Or A 3pao. The Physical Security Aspects Associated With Contractor Activities Are Also Subject To Such Assessments. The Contractor Shall Report, In Writing, Any Deficiencies Noted During The Above Assessment To The Va Cor/co. The Contractor Shall Use Va S Defined Processes To Document Planned Remedial Actions That Address Identified Deficiencies In Information Security Policies, Procedures, And Practices. The Contractor Shall Correct Security Deficiencies Within The Timeframes Specified In The Va Information Security Knowledge Service.
f. All Major Information System Changes Which Occur In The Production Environment Shall Be Reviewed By The Va To Determine The Impact On Privacy And Security Of The System. Based On The Review Results, Updates To The Authority To Operate (ato) Documentation And Parameters May Be Required To Remain In Compliance With Va Handbook 6500 And Va Information Security Knowledge Service Requirements.
g. The Contractor Shall Conduct An Annual Privacy And Security Self-assessment On All Information Systems And Outsourced Services As Required. Copies Of The Assessment Shall Be Provided To The Cor/co. The Va/government Reserves The Right To Conduct Assessment Using Government Personnel Or A Third-party If Deemed Necessary. The Contractor Shall Correct Or Mitigate Any Weaknesses Discovered During The Assessment.
h. Va Prohibits The Installation And Use Of Personally Owned Or Contractor-owned Equipment Or Software On Va Information Systems. If Non-va Owned Equipment Must Be Used To Fulfill The Requirements Of A Contract, It Must Be Stated In The Service Agreement, Sow, Pws, Pd Or Contract. All Security Controls Required For Government Furnished Equipment Must Be Utilized In Va Approved Other Equipment (oe). Configuration Changes To The Contractor Oe, Must Be Funded By The Owner Of The Equipment. All Remote Systems Must Use A Va-approved Antivirus Software And A Personal (host-based Or Enclave Based) Firewall With A Va-approved Configuration. The Contractor Shall Ensure Software On Oe Is Kept Current With All Critical Updates And Patches. Owners Of Approved Oe Are Responsible For Providing And Maintaining The Anti-virus Software And The Firewall On The Non-va Owned Oe. Approved Contractor Oe Will Be Subject To Technical Inspection At Any Time.
i. The Contractor Shall Notify The Cor/co Within One Hour Of Disclosure Or Successful Exploits Of Any Vulnerability Which Can Compromise The Confidentiality, Integrity, Or Availability Of The Information Systems. The System Or Effected Component(s) Need(s) To Be Isolated From The Network. A Forensic Analysis Needs To Be Conducted Jointly With Va. Such Issues Will Be Remediated As Quickly As Practicable, But In No Event Longer Than The Timeframe Specified By Va Information Security Knowledge Service. If Sensitive Personal Information Is Compromised Reference Va Handbook 6500.2 And Section 5, Security Incident Investigation.
j. For Cases Wherein The Contractor Discovers Material Defects Or Vulnerabilities Impacting Products And Services They Provide To Va, The Contractor Shall Develop And Implement Policies And Procedures For Disclosure To Va, As Well As Remediation. The Contractor Shall, Within 30 Business Days Of Discovery, Document A Summary Of These Vulnerabilities Or Defects. The Documentation Will Include A Description Of The Potential Impact Of Each Vulnerability And Material Defect, Compensating Security Controls, Mitigations, Recommended Corrective Actions, Fbonotice Cause Analysis And/or Workarounds (i.e., Monitoring). Should There Exist Any Backdoors In The Products Or Services They Provide To Va (referring To Methods For Bypassing Computer Authentication), The Contractor Shall Provide
the Va Co/co Written Assurance They Have Permanently Remediated These Backdoors.
k. All Other Vulnerabilities, Including Those Discovered Through Routine Scans Or Other Assessments, Will Be Remediated Based On Risk, In Accordance With The Remediation Timelines Specified By The Va Information Security Knowledge Service And/or The Applicable Timeframe Mandated By Cybersecurity & Infrastructure Security Agency (cisa) Binding Operational Directive (bod) 22-01 And Bod 19-02 For Internet-accessible Systems. Exceptions To This Paragraph Will Only Be Granted With The Approval Of The Cor/co.
8. Security And Privacy Controls Compliance Testing, Assessment
and Auditing. This Entire Section Applies Whenever Section 6 Or 7 Is Included.
a. Should Va Request It, The Contractor Shall Provide A Copy Of Their (corporation S, Sole Proprietorship S, Partnership S, Limited Liability Company (llc), Or Other Business Structure Entity S) Policies, Procedures, Evidence And Independent Report Summaries Related To Specified Cybersecurity Frameworks (international Organization For Standardization (iso), Nist Cybersecurity Framework (csf), Etc.). Va Or Its Third-party/partner Designee (if Applicable) Are Further Entitled To Perform Their Own Audits And Security/penetration Tests Of The Contractor S It Or Systems And Controls, To Ascertain Whether The Contractor Is Complying With The Information Security, Network Or System Requirements Mandated In The Agreement Between Va And The Contractor.
b. Any Audits Or Tests Of The Contractor Or Third-party Designees/partner Va Elects To Carry Out Will Commence Within 30 Business Days Of Va Notification. Such Audits, Tests And Assessments May Include The Following: (a): Security/penetration Tests Which Both Sides Agree Will Not Unduly Impact Contractor Operations; (b): Interviews With Pertinent Stakeholders And Practitioners; (c): Document Review; And (d): Technical Inspections Of Networks And Systems The Contractor Uses To Destroy, Maintain, Receive, Retain, Or Use Va Information.
c. As Part Of These Audits, Tests And Assessments, The Contractor Shall Provide All Information Requested By Va. This Information Includes, But Is Not Limited To, The Following: Equipment Lists, Network Or Infrastructure Diagrams, Relevant Policy Documents, System Logs Or Details On Information Systems Accessing, Transporting, Or Processing Va Data.
d. The Contractor And At Its Own Expense, Shall Comply With Any Recommendations Resulting From Va Audits, Inspections And Tests. Va Further Retains The Right To View Any Related Security Reports The Contractor Has Generated As Part Of Its Own Security Assessment. The Contractor Shall Also Notify Va Of The Existence Of Any Such Security Reports Or Other Related Assessments, Upon Completion And Validation.
e. Va Appointed Auditors Or Other Government Agency Partners May Be Granted Access To Such Documentation On A Need-to-know Basis And Coordinated Through The Cor/co. The Contractor Shall Comply With Recommendations Which Result From These Regulatory Assessments On The Part Of Va Regulators And Associated Government Agency Partners.
9. Product Integrity, Authenticity, Provenance, Anti-counterfeit And Anti-tampering. This Entire Section Applies When The Acquisition Involves Any Product (application, Hardware, Or Software) Or When Section 6 Or 7 Is Included.
a. The Contractor Shall Comply With Code Of Federal Regulations (cfr) Title 15 Part 7, Securing The Information And Communications Technology And Services (icts) Supply Chain , Which Prohibits Icts Transactions From Foreign Adversaries. Icts Transactions Are Defined As Any Acquisition, Importation, Transfer, Installation, Dealing In Or Use Of Any Information And Communications Technology Or Service, Including Ongoing Activities, Such As Managed Services, Data Transmission, Software Updates, Repairs Or The Platforming Or Data Hosting Of Applications For Consumer Download.
b. When Contracting Terms Require The Contractor To Procure Equipment, The Contractor Shall Purchase Or Acquire The Equipment From An Original Equipment Manufacturer (oem) Or An Authorized Reseller Of The Oem. The Contractor Shall Attest That Equipment Procured From An Oem Or Authorized Reseller Or Distributor Are Authentic. If Procurement Is Unavailable From An Oem Or Authorized Reseller, The Contractor Shall Submit In Writing, Details Of The Circumstances Prohibiting This From Happening And Procure A Product Waiver From The Va Cor/co.
c. All Contractors Shall Establish, Implement, And Provide Documentation For Risk Management Practices For Supply Chain Delivery Of Hardware, Software (to Include Patches) And Firmware Provided Under This Agreement. Documentation Will Include Chain Of Custody Practices, Inventory Management Program, Information Protection Practices, Integrity Management Program For Sub-supplier Provided Components, And Replacement Parts Requests. The Contractor Shall Make Spare Parts Available. All Contractor(s) Shall Specify How Digital Delivery For Procured Products, Including Patches, Will Be Validated And Monitored To Ensure Consistent Delivery. The Contractor Shall Apply Encryption Technology To Protect Procured Products Throughout The Delivery Process.
d. If A Contractor Provides Software Or Patches To Va, The Contractor Shall Publish Or Provide A Hash Conforming To The Fips Security Requirements For Cryptographic Modules (fips 140-2 Or Successor).
e. The Contractor Shall Provide A Software Bill Of Materials (sbom) For Procured (to Include Licensed Products) And Consist Of A List Of Components And Associated Metadata Which Make Up The Product. Sboms Must Be Generated In One Of The Data Formats Defined In The National Telecommunications And Information Administration (ntia) Report The Minimum Elements For A Software Bill Of Materials (sbom).
f. Contractors Shall Use Or Arrange For The Use Of Trusted Channels To Ship Procured Products, Such As U.s. Registered Mail And/or Tamper-evident Packaging For Physical Deliveries.
g. Throughout The Delivery Process, The Contractor Shall Demonstrate A Capability For Detecting Unauthorized Access (tampering).
h. The Contractor Shall Demonstrate Chain-of-custody Documentation For Procured Products And Require Tamper-evident Packaging For The Delivery Of This Hardware.
summary:
this Is A Sources Sought Notice And Not A Request For Quotes. This Request Is Solely For The Purpose Of Conducting Market Research To Enhance Vha S Understanding Of The Market S Offered Products, Services, And Capabilities. The Government Will Not Pay Any Costs For Responses Submitted In Response To This Sources Sought.
this Sources Sought Notice Provides An Opportunity For Respondents To Submit Their Notice Of Ability, And Their Available Products And Services In Response To The Requirement. Vendors Are Being Invited To Submit Information Relative To Their Potential Of Fulfilling This Requirement In The Form Of A Capability Response That Addresses The Specific Requirement Identified In This Sources Sought.
this Sources Sought Is To Facilitate The Contracting Officer S Review Of The Market Base, For Acquisition Planning, Size Determination, And Procurement Strategy.
response Commitment:
i. Response:
all Potential Sources Are Invited To Submit, In Writing, A Capability Statement With Sufficient Information To Substantiate Your Business Is Reasonably Capable Of Performing The Work. The Capability Statement Must Clearly Demonstrate A Business S Ability To Fulfill The Requirement. The Burden Of Proof Rests With The Contractor; Therefore, Written Responses Must Provide Clear And Unambiguous Evidence To Substantiate Capabilities Appropriate To Satisfy This Need.
a. Capability Statement With General Understanding Of The Industry And Current Knowledge And Subcontract Networks That Would Be Used To Support The Requirement As Identified Herein. Subcontractors Will Need The Security Requirements Listed In This Sources Sought. Submittals Furnished Will Not Be Returned To The Sender. No Debriefs Will Be Conducted. Eligibility In Participating In A Future Acquisition Does Not Depend Upon A Response To This Notice.
responses Shall Provide Administrative Information, And Shall Include The Following As A Minimum:
Company Name, Sam Uei Number, Company Mailing Address, Phone Number, Fax Number, Name And Title Of Designated Point Of Contact And E-mail Of Designated Point Of Contact.
company Business Size And Status (i.e., Large Business, Small Business, Service-disabled Veteran Owned Small Business, Women-owned Small Business, Etc.), The Number Of Years In Business.
b. Proprietary Information Is Neither Requested Nor Desired. If Such Information Is Submitted, It Must Clearly Be Marked "proprietary" On Every Sheet Containing Such Information, And The Proprietary Information Must Be Segregated To The Maximum Extent Practicable From Other Portions Of The Response (e.g., Use An Attachment Or Exhibit).
submit Responses Email Only To Karly.gabrysiak@va.gov
ii. Timeline:
a. This Request Will Close On 01/06/2025 At 8am Est.
notes:
1. This Sources Sought Is For Planning Purposes Only, And Does Not Constitute A Commitment, Implied Or Otherwise, That A Procurement Action Will Follow. The Department Of Veterans Affairs Will Use The Information Submitted In Response To This Notice At Its Discretion And Will Not Provide Comments To Any Submission; However, The Department Of Veterans Affairs Reserves The Right To Contact Any Respondent To This Notice For The Sole Purpose Of Enhancing The Department Of Veteran Affairs Understanding Of The Notice Submission.
2. The Content Of Any Responses To This Notice May Be Reflected In Any Subsequent Solicitation, Except For Content Marked Or Designated As Business Confidential Or Proprietary Which Will Be Fully Protected From Release Outside The Government.
the Department Of Veteran Affairs Contracting Office Point Of Contact:
name: Karly Gabrysiak
title: Contract Specialist
e-mail Address: Karly.gabrysiak@va.gov
Closing Date6 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
United States
Description: Contact Information|4|n743.6|wvf|564-230-3066|francine.a.pommells.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
variation In Quantity (apr 1984)|3|0%|-5%|total Contract Quantity|
time Of Delivery (june 1997)|20|0001|500|365 Days||||||||||||||||||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo-receiving Report & Invoice - Material|n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material|n50286|tbd|133.2|n/a|n/a|s4306a - Material|n/a|n/a|see Dd1
423|port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332722|600||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
solicitation Is Amended To Extend The Closing Date To 08jan2025.
1. Data Item A001 (inspection And Test Plan) May Be Waived If Already On Fileat Navsup Wss Mech.
2. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Ofoffers. See Clause 252.213-7000.
3. The Following Proposed Delivery Schedule Applies:
submission Of All Certification Data Cdrls 20 Days Prior To Delivery.
pnsy Review/acceptance Of Certification Cdrls After Receipt
final Delivery Of Material (365 Days)
please Quote Actual Delivery Days
early And Incremental Delivery Is Acceptable At No Additional Cost To Thegovernment.
4. This Procurement Is Issued Pursuant To Emergency Acquisition Flexibilities.
5. A Variation In Quantity Of -5% Of The Total Contract Quantity Is Allowed.see Far 52.211-16 For Further Details.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.2 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;284593-0001 99657 F B;
2.2.3 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-a574 | | | |211201|a| | |
document Ref Data=astm-f606 | | | |191115|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
3. Requirements
3.1 ;socket Head Cap Screw, To Be In Accordance With Marotta Drawing 284593-0001, Item 67, Except As Amplified Or Modified Herein.;
3.2 The Unit Of Issue Is Each.
the Contractor Is Required To Provide One Additional Fastener For Each Uniquely Identified Heat/lot Of Material In Each Shipment. Complete Traceability Must Be Maintained On This Extra Fastener.
3.3 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;socket Head Cap Screw;
material - ;cres 431, Cond.ht/mil-dtl-1222;
3.4 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As
listed Below.
test - ;liquid Penetrant Inspection;
item - ;socket Head Cap Screw;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
3.5 Wedge Tensile Test Specimens (headed Fasteners) - A Wedge Tensile Test Must Be Conducted On A Full Size Fastener For Each Production Lot And Reported Aspart Of The Mechanical Properties. The Required Specimens For The Wedge Tensile Test Must Be Separate
fasteners From Those Required For The Yield Test.
3.5.1 Testing For Socket Head Cap Screws Must Be In Accordance Mil-dtl-1222, Paragraphs 4.5.2.3 And 4.5.2.3.1.
3.5.2 Testing For All Other Headed Fasteners With A Nominal Diameter Greater Than 1/4-inch Must Be In Accordance With Astm-f606 For Grades 5, 8, B7, And B16.for All Other Grades, The Following Wedge Angles Must Be Used.
a. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Of 1/4-inch Through 1-inch (inclusive) Must Be Tested With A Ten Degree Wedge.
b. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Over 1-inch Must Be Tested With A Six Degree Wedge.
c. Fasteners That Are Of Grades 8, B7, B16, 410, 416, 416se, 431, And 630 And Are Threaded Within One Diameter To The Underside Of The Head Must Be Tested As Follows:
sizes 1/4 Inch Through 3/4 Inch (inclusive) Use A Six Degree Wedgesizes Over 3/4 Inch Use A Four Degree Wedge
d. Fasteners Which Have Passed Testing With Wedge Angles Greater Than Those Specified Should Be Considered Acceptable.
3.5.3 For Fasteners Having A Length Less Than The Minimum Specified In Table 1 Of Astm-f606, One "test Specimen Fastener" Must Be Manufactured From Each Lot Of Fasteners And Tested To Represent That Lot. The Length Of These Test Specimen Fasteners Must Meet
the Minimum Specified In Table 1 Of Astm-f606 But Must Not Exceed It By More Than 1/4 Inch. Test Specimen Fasteners Must Be The Same Type, Style, And Diameter As The Production Lot And Must Be Manufactured From The Same Starting Material, Using The Same
manufacturing Techniques As The Production Lot, And Must Be Heat Treated (if Required) Along With The Production Lot.
3.6 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.6.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.6.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22
of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.6.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.7 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.7.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
3.8 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.8.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A
copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.8.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.8.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.9 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.10 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
^ Quality Assurance Requirements ^
3.11 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.12 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.12.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.12.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.12.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.12.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly Notify
the Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma)
office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.12.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.13 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.13.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.13.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.14 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.14.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.14.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.14.3 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.14.4 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.14.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.15 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.15.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.15.2 Inspection For Completeness And Proper Type.
3.15.3 Verification Of Material Quality Received.
3.15.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.15.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.15.6 Identification And Protection From Improper Use Or Disposition.
3.15.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And Necessity
for Withholding The Material From Use.
3.15.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.15.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.16 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements.
3.16.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein.
3.17 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.18 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.18.1 Quantitative Chemical And Mechanical Analysis Of Material Is Required ;in Accordance With Mil-dtl-1222; .test Reports Must Be Traceable To Traceability Marking On The Material. Material Certification Test Reports Must Include The Class, Form, Condition,
grade, Type, Finish, And/or Composition, As Applicable, Of The Material Supplied.
3.18.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification For Chemical Composition Must Be Overstamped And/or Annotated With The Unique Traceability
marking Used With The Altered Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________
(marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ________________ And Heat Treat Number ________________________
(when Applicable)
_________________________________________ Date _____________________
(name And Signature Of Auth. Co. Rep.)
3.18.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.18.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.18.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.19 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The Marking
requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Marking Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is Permissible
provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.19.1 Fasteners Must Be Marked In Accordance With ;mil-dtl-1222; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked By
method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective
compounds.
3.19.2 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side Location
if Necessary). Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed By Approximately .010" Located On The Top Perimeter Of The Head Of
the Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings.
3.20 Material Handling - The Written Material Control Process Must Include The Following:
3.20.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.20.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.20.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats Or Loss Of Traceability. The Traceability Marking
must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.20.4 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By The Traceability Marking On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.20.5 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.21 Receiving Inspection -
3.21.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.21.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.22 Discrepancy Reporting -
3.22.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Will Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.23 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.23.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.23.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.23.3 All Data Concerning Material Verification (chemical And Mechanical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification Test Reports
must Also Be 100% Inspected For Completeness And Legibility.
3.23.4 All Metallic Material Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.24 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed
- Oct 29 2010 - Added Sampling Std For Li In-process Testing
- Sep 30 2008 - Thread Inspection Requirements Were Clarified
- Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section;
date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply.
date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
Closing Date8 Jan 2025
Tender AmountRefer Documents
6001-6010 of 6014 archived Tenders