Tenders of Kilnbridge Construction Services Ltd

Tenders of Kilnbridge Construction Services Ltd

Sorry!
No Active
Tenders of Kilnbridge Construction Services Ltd
found
Check archived
Tenders of Kilnbridge Construction Services Ltd

Kilnbridge Construction Services Ltd Tender

United Kingdom
Closing Date13 Aug 2024
Tender AmountEUR 100 K (USD 109.1 K)
Reinforcement Detailing Works C4 - Kcsl

Kilnbridge Construction Services Ltd Tender

United Kingdom
Closing Date20 Sep 2024
Tender AmountEUR 100 K (USD 110.8 K)
Kilnbridge Have Secured The Hs2 Old Oak Common Station Works Package Wp10.2 For Construction Of The Headhouses And Ancillary Buildings. Part Of The Scope Requires The Design, Manufacture & Installation Of An Etfe Roofing Systems To One Of The Satellite Buildings Around The Station Complex. The Etfe Roofing System Is Part Of The Scope Or Works To The Building Known As The Cycle Hub The Package Consists Of An Inclined Rooflight With Stressed Single Foil Membrane Which Will Include : - Etfe Foil/film - Natural In Colour With The Required Acceptable Transparency - An Extruded Aluminium Portal Frame / Upstand - Polyester Powder Coating Finish To The Required Colour - Any Pressed Metal Components / Accessories Including Gutters Flashings, Copings, Capping Reveals Etc Were Required - Works Include Also Mock Ups, Samples And Quality Benchmarks. The Specifications And Performance Requirements Included But Not Limited To Are: - Architectural & Structural Specifications - Various Roofing And Drainage Specifications And Standards The Sub Subcontract Works Includes The Provision Of All Necessary People, Equipment, Plant And Materials For The Design, Testing, Manufacture And Installation Of The Etfe Roof System The Subsubcontractor Will Be Responsible For Progressing The Roof Schedule And Associated Stage 4 Drawings Through Design For Manufacture And Installation. This Will Require Submission To, And Acceptance From, The Subcontractor, The Contractor's Representatives And The Employer To Ensure The Provided Sub Subcontractors Design Satisfies The Intent Prior To Construction. All In Accordance With The Contractors Design Procedure And Technical Assistance Requirements. The Scope Also Includes The Design, Supply, Installation, Management And Removal Of Any Temporary Works Required To Execute The Subsubcontract Works And The Provision Of Sufficient Temporary Protection Of The Finished Roofing Systems Were Required. Roof Covering Circa 180sqm Expected Subsubcontract Award Q1 2025 Construction Is To Be Carried Out Over A 2.5-year Period Commencing And Completed In Q2 2028.

Kilnbridge Construction Services Ltd Tender

United Kingdom
Closing Date20 Sep 2024
Tender AmountEUR 250 K (USD 277.1 K)
Bird Deterrant Netting C4 - Kcsl

Kilnbridge Construction Services Ltd Tender

Civil And Construction...+1Civil Works Others
United Kingdom
Closing Date15 Oct 2024
Tender AmountEUR 5 Million (USD 5.4 Million)
Kilnbridge Have Secured The Hs2 Old Oak Common Station Works Package Wp10.2 For Construction Of The Headhouses And Ancillary Buildings. Part Of The Scope Requires The Design, Manufacture & Installation Of 100+ External Door Sets To Numerous Satellite Buildings Around The Station Complex. Those Buildings Include The Following: • South Portal • West Core • East Core • Train Crew And Catering Building • North Portal • Cycle Hub • Various Smaller Vent Structures • Dno Interface Substation The Package Includes A Large Number Of External Doors Sets And Will Include A Range Of Different Specification And Performance Criteria Such As: - Single, 1.5 And Double Door Sets - Oversized Plant Access Doors - Louvred Doors - External Envelope Doors With Integrated Cladding To External Face - Mild Steel And Stainless-steel Door Sets And Frames With Varied Coatings To Resist Corrosion. - Vision Panels - Installed To Various Substrates - Fire Rated Doors (various Levels) - Security Rated Doors (various Levels) - Acoustic Rated Doors (various Levels) - Weather Rated (various Levels) - Integration With The Bms (building Management System) - Doors And Hardware That Cater For Ultimate Differential Pressure Loading - Provision Of All Associated Hardware, Suitable For Use In Public Areas And Sub Surface - And All Ancillary Items Where Required. This Includes Detailing All Openings Including Additional Supports Around The Openings. Works Include Also Mock Ups, Samples And Quality Benchmarks. The Sub Subcontract Works Includes The Provision Of All Necessary People, Equipment, Plant And Materials For The Design, Testing, Manufacture And Installation Of All External Doors Sets. The Subsubcontractor Will Be Responsible For Progressing The Door Schedule And Associated Stage 4 Drawings To Be Designed For Manufacture And Installation. This Will Require Submission To, And Acceptance From, The Subcontractor, The Contractor's Representatives And The Employer To Ensure The Provided Sub Subcontractors Design Satisfies The Intent Prior To Construction. All In Accordance With The Contractors Design Procedure And Technical Assistance Requirements. The Production Of Mock Ups And Samples As Required For Acceptance. The Scope Also Includes The Design, Supply, Installation, Management And Removal Of Any Temporary Works Required To Execute The Sub Subcontract Works And The Provision Of Sufficient Temporary Protection Of The Doors. The Works Will Also Require Multiple Visits Throughout The Contract Duration From Design Stage To Completion. Quantity Of Door Sets - Circa 90+. Expected Subsubcontract Award Jan 25 Construction Is To Be Carried Out Over A 2.5 Year Period Commencing In Q1 2026 And Completing In Late Q2 2028. Multiple Visits Will Be Required Over This Period.

Kilnbridge Construction Services Ltd Tender

Civil And Construction...+1Others
United Kingdom
Closing Date15 Oct 2024
Tender AmountEUR 1 Million (USD 1 Million)
Kilnbridge Have Secured The Hs2 Old Oak Common Station Works Package Wp10.2 For Construction Of The Headhouses And Ancillary Buildings. Part Of The Scope Requires The Design, Manufacture & Installation Of Various Ventilation And Envelope Louvre Systems To Numerous Satellite Buildings Around The Station Complex. Those Buildings Include The Following: • South Portal • North Portal • West Core • East Core • Various Smaller Vent Structures The Scope Of Works Includes A Large Number Of Louvre Types Ranging In Size And Build Up And Will Include A Range Of Different Specification And Performance Criteria Such As: - Acoustic Louvres (various Ratings To Meet Specifications ) - Mechanical Louvre (varied To Meet Specifications) - Louvres To Meet Various Requirements Including Security, Acoustic, Fire And Weather Proof Ratings - Various Finishes And Materials - Isolators Applicable To Reduce Any Risk Of Bi-metallic Corrosion. - Pest Control Mesh (varied To Meet Specifications) - Securing To Various Substrates - All Louvre Materials Should Be Compliant To Class A-s3d2 In Accordance With Bs En 13501-1:2007 - Fire Rating To Comply With Broof (t4) Requirements (varied Class Ratings To Meet Specifications For Roof Louvres) - And All Ancillary Items Where Required. This Includes Detailing All Openings Including Additional Supports Around The Openings. Works Include Also Mock Ups, Samples And Quality Benchmarks The Sub Subcontract Works Includes The Provision Of All Necessary People, Equipment, Plant And Materials For The Design, Testing (where Required Including Potential Post Installation Testing To Verify Performance), Manufacture And Possible Installation Of Various Louvre Systems The Subsubcontractor Will Be Responsible For Progressing The Louvre Schedule And Associated Stage 4 Drawings Through Design For Manufacture And In Some Cases, Installation. This Will Require Submission To, And Acceptance From, The Subcontractor, The Contractor's Representatives And The Employer To Ensure The Provided Sub Subcontractors Design Satisfies The Intent Prior To Construction. All In Accordance With The Contractors Design Procedure And Technical Assistance Requirements. The Scope Also Includes The Design, Supply, Installation, Management And Removal Of Any Temporary Works Required To Execute The Sub Subcontract Works And The Provision Of Sufficient Temporary Protection Of The Louvres. The Works Will Require Multiple Visits Throughout The Contract Duration From Design Stage To Completion. Quantity Of Louvres - Circa 800+m2 Expected Subsubcontract Award Jan 25 Construction Is To Be Carried Out Over A 2.5 Year Period Commencing In Q1 2026 And Completing In Late Q2 2028. Multiple Visits Will Be Required Over This Period.