Tenders of Kilnbridge Construction Services Ltd

Tenders of Kilnbridge Construction Services Ltd

Sorry!
No Active
Tenders of Kilnbridge Construction Services Ltd
found
Check archived
Tenders of Kilnbridge Construction Services Ltd

Kilnbridge Construction Services Ltd Tender

United Kingdom
Reinforcement Detailing Works C4 - Kcsl
Closing Date13 Aug 2024
Tender AmountEUR 100 K (USD 109.1 K)

Kilnbridge Construction Services Ltd Tender

United Kingdom
Kilnbridge Have Secured The Hs2 Old Oak Common Station Works Package Wp10.2 For Construction Of The Headhouses And Ancillary Buildings. Part Of The Scope Requires The Design, Manufacture & Installation Of An Etfe Roofing Systems To One Of The Satellite Buildings Around The Station Complex. The Etfe Roofing System Is Part Of The Scope Or Works To The Building Known As The Cycle Hub The Package Consists Of An Inclined Rooflight With Stressed Single Foil Membrane Which Will Include : - Etfe Foil/film - Natural In Colour With The Required Acceptable Transparency - An Extruded Aluminium Portal Frame / Upstand - Polyester Powder Coating Finish To The Required Colour - Any Pressed Metal Components / Accessories Including Gutters Flashings, Copings, Capping Reveals Etc Were Required - Works Include Also Mock Ups, Samples And Quality Benchmarks. The Specifications And Performance Requirements Included But Not Limited To Are: - Architectural & Structural Specifications - Various Roofing And Drainage Specifications And Standards The Sub Subcontract Works Includes The Provision Of All Necessary People, Equipment, Plant And Materials For The Design, Testing, Manufacture And Installation Of The Etfe Roof System The Subsubcontractor Will Be Responsible For Progressing The Roof Schedule And Associated Stage 4 Drawings Through Design For Manufacture And Installation. This Will Require Submission To, And Acceptance From, The Subcontractor, The Contractor's Representatives And The Employer To Ensure The Provided Sub Subcontractors Design Satisfies The Intent Prior To Construction. All In Accordance With The Contractors Design Procedure And Technical Assistance Requirements. The Scope Also Includes The Design, Supply, Installation, Management And Removal Of Any Temporary Works Required To Execute The Subsubcontract Works And The Provision Of Sufficient Temporary Protection Of The Finished Roofing Systems Were Required. Roof Covering Circa 180sqm Expected Subsubcontract Award Q1 2025 Construction Is To Be Carried Out Over A 2.5-year Period Commencing And Completed In Q2 2028.
Closing Date20 Sep 2024
Tender AmountEUR 100 K (USD 110.8 K)

Kilnbridge Construction Services Ltd Tender

United Kingdom
Bird Deterrant Netting C4 - Kcsl
Closing Date20 Sep 2024
Tender AmountEUR 250 K (USD 277.1 K)

Kilnbridge Construction Services Ltd Tender

Civil And Construction...+1Civil Works Others
United Kingdom
Kilnbridge Have Secured The Hs2 Old Oak Common Station Works Package Wp10.2 For Construction Of The Headhouses And Ancillary Buildings. Part Of The Scope Requires The Design, Manufacture & Installation Of Various Roofing Systems To Satellite Buildings Around The Station Complex. Those Buildings Include The Following: • South Portal • West Core • East Core • Train Crew And Catering Building • North Portal • Cycle Hub • Interface Sub Station • East Vent The Package Includes Various Roofing Systems And Build Ups And Will Include A Range Of Different Specification And Performance Criteria Such As: - Polymer Primers - Liquid Applied Waterproofing (to Meet Required Specification) - Various Membrane Types (to Meet Required Specification) - Water Flow Reduction Layers (to Meet Required Specification) - Insulation (to Meet Required Specification) - Vapour Control Layers. - Drainage Outlets And Assemblies With Compatible Leaf And Gravel Guards - Inspection Chambers - Concrete Paving Slabs And Pedestals - Zinc Double Seam Standing Roof - Aluminium Standing Seam Roofing - Perimeter Gutters - Pressed Components/ Accessories With A Polyester Powder Coating Finish - Drainage Edge Channel With Stainless Steel Grating - Movement/expansion Joints - And All Ancillary Items Where Required. This Includes Detailing All Openings Including Additional Supports Around The Openings. Works Include Also Mock Ups, Samples And Quality Benchmarks. Specifications And Performance Requirements Included But Not Limited To - Materials Fire Classification Broof (t4) In Accordance With Bs En 13501-5 - Acoustic Bs En Iso 354 ( As Required By The Acoustic Consultants ) - Bs En 507 'roofing Products From Metal Sheet. Specification For Fully Supported Roofing Products Of Aluminium Sheet - Thermal Performance Requirements - Bs En 14782 'self-supporting Metal Sheet For Roofing, External Cladding And Internal Lining. Product Specification And Requirements - Bs 5427 'code Of Practice For The Use Of Profiled Sheet For Roof And Wall Cladding On Buildings'. - Drainage Bs En 12056: Part 3 And Bs 8490 - Condensation With Bs 5250, Bs En Iso 13788 The Subsubcontract Works Includes The Provision Of All Necessary People, Equipment, Plant And Materials For The Design, Testing, Manufacture And Installation Of All Roof Systems The Subsubcontractor Will Be Responsible For Progressing The Roofing Schedule And Associated Stage 4 Drawings Through Design For Manufacture And Installation. This Will Require Submission To, And Acceptance From, The Subcontractor, The Contractor's Representatives And The Employer To Ensure The Provided Sub Subcontractors Design Satisfies The Intent Prior To Construction. All In Accordance With The Contractors Design Procedure And Technical Assistance Requirements.
Closing Date5 Nov 2024
Tender AmountEUR 10 Million (USD 10.8 Million)

Kilnbridge Construction Services Ltd Tender

Civil And Construction...+1Civil Works Others
United Kingdom
Roofing Systems C4 - Kcsl
Closing Date5 Nov 2024
Tender AmountGBP 5 Million (USD 6.4 Million)