Tenders of Integral Coach Factory

Tenders of Integral Coach Factory

Integral Coach Factory - ICF Tender

Goods
Machinery and Tools
Ireps
India, India
Supply And Installation Of Traction Motor Under Frame Duct Fixing Arrgt
Closing Date10 Dec 2024
Tender AmountINR 500 K (USD 5.9 K)
This is an estimated amount, exact amount may vary.

Integral Coach Factory - ICF Tender

Goods
Civil And Construction
Ireps
India, India
Supply And Installation Of Cat Walk Arrangement Over Roof For Panto Area For Emu/us/tc/ac Coaches
Closing Date10 Dec 2024
Tender AmountINR 500 K (USD 5.9 K)
This is an estimated amount, exact amount may vary.

Integral Coach Factory - ICF Tender

Goods
Machinery and Tools
Ireps
India, India
Solderless Crimping Terminal
Closing Date9 Dec 2024
Tender AmountINR 500 K (USD 5.9 K)
This is an estimated amount, exact amount may vary.

Integral Coach Factory - ICF Tender

Services
Solar Installation and Products...+1Electrical and Electronics
GEM
India
Amc/ Camc Of Solar Energy Power Plants - Non-comprehensive; Others; On-grid Solar System
Closing Date16 Sep 2024
Tender AmountINR 1.3 Million (USD 15.8 K)

Integral Coach Factory - ICF Tender

Goods
Automobiles and Auto Parts
Ireps
India, India
End Part For D Coach
Closing Date10 Dec 2024
Tender AmountINR 26.8 Million (USD 317.2 K)
This is an estimated amount, exact amount may vary.

Integral Coach Factory - ICF Tender

Goods
Automobiles and Auto Parts
Ireps
India, India
31110952 one Coach Set Of End Part For Air Conditioned Emu Trailer Coaches To Drg. nos. Emu/c/ac-1-1-002, Col-iii, Alt 'c' -1 No. Emu/c/ac-1-1-003, Col-i, Alt 'b' -1 No. Special Condi tion: I) The Manufacturing Facility Requirement As Per Icf/md/spec-147, Issue Status-01,re v-02, Amendment No.01. Ii) Body Bolster To Drg.no.icf/mrvc/c/ss-1-1-005, Alt 'h', Col.i To Be provided Without A)side Bearers To Drg.no.emu/m-1-1-027,alt 'l' Col-ii. B)grubscrews To Dr g.no.icf/mrvc/c/ss-1-1-005, Alt 'h' Item-8, And C)side Bearer Covers To Drg.no.emu/m-1-1-027, alt 'l' Item-1. Iii)the Under Frame End Part Should Be Supplied With Normal Side Up And Side bearer Side Down. Suitable Packing To Be Done To Prevent Damage During Transit, Unloa ding And Rust Prevention During Storage. [safety Item] [ Warranty Period: 30 Months After T he Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation permitted: Max 8 Lacs ] ] consignee Shell Depot/icf,chennai, Icf Tamil Nadu 25.00 Set inspection details Stage Inspection Not Required
Closing Date10 Dec 2024
Tender AmountINR 12.8 Million (USD 151.2 K)
This is an estimated amount, exact amount may vary.

Integral Coach Factory - ICF Tender

Goods
GEM
Corrigendum : Closing Date Modified
India
CATEGORY: Access Controlled Handle Door Lock (Q3)
Closing Date10 Dec 2024
Tender AmountRefer Documents 

Integral Coach Factory Tender

Works
Manpower Supply...+2Electrical Works, Electrical and Electronics
Ireps
India
Electrical Works For Computerized Gate Entry System For Contract Staff Near Swg Of Shell Factory.
Closing Date10 Dec 2024
Tender AmountINR 467 K (USD 5.5 K)

Integral Coach Factory - ICF Tender

Goods
Electrical Goods and Equipments...+1Electrical and Electronics
Ireps
India
Led Strip Light 2x25 Mtrs, 12v Dc, 25a
Closing Date11 Dec 2024
Tender AmountRefer Documents 
This is an estimated amount, exact amount may vary.

Integral Coach Factory - ICF Tender

Goods
Machinery and Tools
Ireps
India, India
Side Bearer Complete
Closing Date11 Dec 2024
Tender AmountINR 3.3 Million (USD 39.2 K)
This is an estimated amount, exact amount may vary.
5611-5620 of 5634 archived Tenders