Hvac Tenders

Hvac Tenders

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+1Building Construction
United States
Details: Introduction network Contracting Office 1 (nco 1), Supporting Va New England Healthcare System (visn 1) And The Va Boston Healthcare System (hcs) Is Seeking Potential Sources For An Upcoming Requirement As Described In The Attached Statement Of Work For The Project; Upgrade Visn 1 Laundry Building 45. This Notice Is Not A Request For Proposals. This Notice Is A Market Research Tool And Has Not Been Set-aside For Any Small Business Category, However The Notice Is Issued To Determine Appropriate Set-aside Categories. Responses To This Notice, In Conjunction With Other Government Market Research Resources, Will Be Used By The Contracting Officer To Determine The Applicable Socio-economic Set-aside For The Procurement. the Purpose Of This Notice Is To Determine If There Are Qualified Sdvosbs Or Vosbs, Wosbs, And Small Businesses That Have The Experience With This Type Of Work And If Such Firms Are Interested In This Procurement. Once The Appropriate Set-aside Is Determined, A Separate Public Announcement Requesting Bids Or Proposals Will Be Publicized On Sam.gov Contract Opportunities In Accordance With 40 U.s. Code § 1101 And Far 36.601. The Solicitation Is Estimated To Be Released In March 2025. general Project Description, Magnitude, And Naics the Va Boston Hcs In Brockton, Ma, Requires A Contractor To All Labor, Equipment, Materials And Supervision For The Renovation And Improvements Of The Visn 1 Laundry, Building 45 For Veterans Affairs Medical Center, Brockton, Massachusetts In Accordance With Contract Documents. the Renovation Includes Selective Demolition Of All Existing Mechanical, Electrical And Plumbing (mep) Systems, Selective Demolition Of Existing Finishes, Doors, Structural Slab, And Other Existing Items. The Renovation Also Includes The Construction Of Structural Improvements, Doors, Electrical Systems, Hvac Systems, Plumbing Systems, Start-up Of Previously Installed Elevator By Renovating Associated Electrical And Mechanical Components, And Interior And Exterior Finishes. In Addition To The Renovation, The Improvements To Building 45 Include Ensuring Exterior Envelop Around Doors, Windows, And Stair Towers Along With Any Penetrations Are Sealed Properly. Moreover, Renovation Includes Construction Of A Service Platform And Stairs For Dedicated Emergency Generator System. The Focus Of The Project Is To Provide Structural Slab Repairs And Replacement To Sustain Required Laundry Equipment Loads And Vibrations. this Project Also Requires Specialized Personnel, With Specified Experience, To Assist In The Cqc System Manager For The Following Areas, As Applicable: Electrical, Mechanical, Civil, Structural, Environmental, Architectural, Materials Technician Submittals Clerk, Commissioning Agent/leed Specialist, And Low Voltage Systems. These Individuals Or Specified Technical Companies Are Directly Employed By The General Contractor And Cannot Be Employed By A Supplier Or Subcontractor On This Project; Be Responsible To The Cqc System Manager; Be Physically Present At The Construction Site During Work On The Specialized Personnel S Areas Of Responsibility; Have The Necessary Education Or Experience In Accordance With The Experience Matrix Listed Herein. These Individuals Can Perform Other Duties But Need To Be Allowed Sufficient Time To Perform The Specialized Personnel S Assigned Quality Controls Duties As Described In The Cqc Plan. A Single Person Can Cover More Than One Area Provided That The Single Person Is Qualified To Perform Qc Activities In Each Designated And That Workload Allows. experience Matrix area qualifications civil graduate Civil Engineer Or Construction Manager With 2 Years Experience In The Type Of Work Being Performed On This Project Or Technician With 5 Years Related Experience. mechanical graduate Mechanical Engineer With 2 Years Experience Or Construction Professional With 5 Years Of Experience Supervising Mechanical Features Of Work In The Field With A Construction Company. electrical graduate Electrical Engineer With 2 Years Related Experience Or Construction Professional With 5 Years Of Experience Supervising Electrical Features Of Work In The Field With A Construction Company. structural graduate Civil Engineer (with Structural Track Or Focus), Structural Engineer, Or Construction Manager With 2 Years Experience Or Construction Professional With 5 Years Experience Supervising Structural Features Of Work In The Field With A Construction Company. architectural graduate Architect With 2 Years Experience Or Construction Professional With 5 Years Of Related Experience. environmental graduate Environmental Engineer With 3 Years Experience. submittals submittal Clerk With 1 Year Experience. concrete, Pavement, And Soils materials Technician With 2 Years Experience For The Appropriate Area. testing, Adjusting, And Balancing (tab) specialist Must Be A Member Of Aabc Or An Experienced Technician Of The Firm Certified By The Nebb. design Quality Control Manager registered Architect Or Professional Engineer the Estimated Magnitude Of This Construction Project Is Between $5,000,000.00 And $10,000,000.00. This Information Is Provided Per Vaar 836.204. The Naics Code Is 236220 And The Small Business Size Standard Is $45 Million. Interested Parties Should Indicate Their Interest To Kyle Kiepke No Later Than 4:00 Pm Est Friday, January 17, 2025, Via Email At Kyle.kiepke@va.gov. information Sought a) Sam Unique Entity Id (uei) b) Bonding Capability; Per Contract And Aggregate. Provide Amount Of Aggregate Bonding Currently Available (i.e., Amount Not Committed). c) Experience. Submission Of A Maximum Of Three (3) Recent And Relevant Examples Of Completed Or Substantially Completed (eighty Percent (80%)) Projects Between $5,000,000.00 And $10,000,000.00, Of Similar Scope To The Upgrade Visn 1 Laundry Building 45 Project. relevant Experience Shall Include Repair And Strengthening Of Existing Heavy Load-bearing Reinforced Concrete Structural Elements (such As Beams, Columns, Slabs, And Foundations) And Structural Framing In Already Completed Building, Cast In Place Concrete (to Include Footing, Pier And Foundation Installation), Reinforced Cmu Wall Installation, Concrete Beam Enlargement, Epoxy Injection Crack Repair, Slab Repair, Underside Slab Repair, And All Other Work Similar In Scope. Recent Is Defined As Completed Within The Last Five (5) Years. submission Instructions interested Firms Shall Hold Active Sam Registration. Visit Www.sam.gov To Register In This Database. sdvosb Or Vosb Firms Shall Be Certified By Veterans Small Business Certification (vetcert) (veterans Small Business Certification (sba.gov). all Information Must Be Submitted In Sufficient Detail For A Decision To Be Made. Failure To Submit All Information Requested In Addition To The Below Form May Result In A Contractor Not Being Considered As An Interested Concern. If Adequate Interest Is Not Received By 4:00 Pm Est On December 1, 2024, This Action May Not Be Set-aside For Sdvosbs, Vosbs, Wosbs, Or Small Business Firms. Interested Firms Must Reply Via E-mail To Kyle.kiepke@va.gov With The Subject Attention: 36c24125r0008 - Upgrade Visn 1 Laundry Building 45 . disclaimer this Sources Sought Is Issued Solely For Information And Planning Purposes Only And Does Not Constitute A Solicitation. All Information Received In Response To This Request That Is Marked As Proprietary Will Be Handled Accordingly. In Accordance With Far 15.201(e), Responses To This Notice Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract. Responders Are Solely Responsible For All Expenses Associated With Responding To This Notice.
Closing Date17 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE ARMY USA Tender

Civil And Construction...+3Others, Consultancy Services, Civil And Architectural Services
United States
Details: The Nevada Air National Guard, 152nd Mission Support Group Contracting Office 1776 National Guard Way Reno Nv 89502 Is Issuing This Sources Sought Synopsis As A Means Of Conducting Market Research To Identify Potential Sources Having An Interest And Industry Technologies Available To Support/provide Professional Artchitect-engineering Services (title I) Necessary To Develop A New Design For The Construction Of The Fuel Cell Hangar At The Nevada Air National Guard Base, Reno, Nv. the Result Of This Market Research Will Contribute To Determining The Method Of Procurement, If A Requirement Materializes. Based On The Responses To This Sources Sought Notice/market Research, This Requirement May Be Set-aside For Small Businesses (in Full Or In Part) Or Procured Through Full And Open Competition. Multiple Awards May Be Made. All Small Business Set-aside Categories Will Be Considered. Telephone Inquiries Will Not Be Accepted Or Acknowledged, And No Feedback Or Evaluations Will Be Provided To Companies Regarding Submissions. disclaimer this Sources Sought Is For Informational Purposes Only. This Is Not A Request For Proposal (rfp) To Be Submitted. It Does Not Constitute A Solicitation And Shall Not Be Construed As A Commitment By The Government. Responses In Any Form Are Not Offers And The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. No Funds Are Available To Pay For Preparation Of Responses To This Announcement. Any Information Submitted By Respondents To This Technical Description Is Strictly Voluntary. objectives Of The Sources Sought understand The Level Of Interest And Availability Of Potential Vendors That Could Provide The Requested Design Solution. identify Issues, Roadblocks, And Barriers To Successful Solution Implementations. obtain Vendor Feedback On If The Vendor Will Utilize Any Subcontractors Or Teaming Arrangements. identify If A Total Solution Can Be Provided Via Open Market Contractors. provision Of Other Benefits Of Leveraging A Turnkey Solution. comments Regarding Any Ambiguities Or Needed Clarifications Of The Draft Technical Specifications. obtain Vendor Feedback On Any Other Pre-existing Contracts That Might Meet This Need. program Background the Fuel Cell Hangar Was Designed In 1997 And Was Constructed In 1999 To Support C-130 Aircraft Maintenance Operations. Since 1997, The Authorized Square Footage (sf) For A C-130 Fuel Cell Hangar Has Increased Due To Safety Requirements, Maintenance Procedures, And Airframe Size. Per Current Ufc, The Buffer Zone Around The Aircraft Nose And Wingtip Is 15 Feet. Currently, The Clearanace At The Nose Is 9 Feet While The Clearance In Front Of The Engines Are 10 Feet To The Nearest Structure. The Fuel Cell Hangar Primarily Supports Two Aircraft Maintenance Functions, Maintenance Dock, And Corrosion Control. The Fuel Cell Maintenance Dock Currently Operates At 83% Of The Authorized Sf. To 1-1-691, Requires Aircraft Be Washed Every 180 Days And At Completion Of An Isochronal Inspection (iso). Aircraft Washing Is Crucial For Nevada’s Aircraft Due To The Fire-retardant Chemical That Is Utilized As Part Of The Modular Airborne Fire Fighting System (maffs). Insufficient Sf In The Maintenance Dock Doesn’t Allow For Ground Cleaning Equipment To Transition Around The Aircraft Without Placing The Main Hangar Door In The Open Position. During The Winter Months, The Open Hangar Door Allows For Freezing Rain And Snow To Deposit On The Maintenance Dock Floor Creating A Safety Hazard And An Extremely Cold Work Environment. Corrosion Control Operates At 55% Of The Authorized Sf. This Sf Shortfall Forces Equipment And Aircraft Parts Be Stored In The Paint And Media Blasting Preparation Area. Equipment And Parts Are Constantly Relocated Outside Of The Facility, Or Placed On The Maintenance Dock Floor To Allow Access To The Preparation Area. Additionally, The Primary Media Blasting Room Is Currently Inoperable Due To A Risk Assessment Code (rac) For Improper “dirty/clean” Transition Zones Per Ufc 4-211-02. All Media Blasting Is Currently Performed In Smaller Self-contained Blasting Cabinets. The Blasting Cabinets Only Accommodate Smaller Parts And Require Additional Operating Space For Parts Handling And Circulation. required Capabilities the Government Requires Designs For The Construction Of A New Fuel Cell/corrosion Control Facility Utilizing Conventional Design And Construction Methods To Accommodate The Mission Of The 152nd Aircraft Maintenance Group. Facilities Will Be Designed As Permanent Construction In Accordance With The Dod Unified Facilities Criteria (ufc) 1-200-01, General Building Requirements And Ufc 1-200-02, High Performance And Sustainable Building Requirements. Provide Reinforced Concrete Foundation And Floor Slab With Steel Framed Walls And Roof Structure. Include Fire Suppression, Hvac And Electrical Distribution. Exterior Work Includes Pavements, Utilities, Drainage, And Communication Support. Air Conditioning 12 Tons.the A-e Is Responsible For Determining What Disciplines And Skill Sets Are Required For Accomplishing The Work And Form A Team Accordingly. The A-e Will Need To Work Extensively To Ensure Understanding And Compliance With All Federal, State, And Local Codes, Criteria, And Permitting Requirements. The A-e Must Accomplish The Required Services And Furnish To The Government Reports And Other Data Together With Supporting Material Developed During The Period Of Performance As Set Forth Herein. The A-e Must Provide Services To The Government During Solicitation And Construction Of The Project As They Pertain To Correcting Ambiguities, Errors, Deficiencies, And Omissions In The Design. special Requirements any Resulting Contract Shall Be Compliant With The Specialty Metals Restriction Of The Berry Amendment (10 U.s.c. 2533a And 2533b) In Accordance With Dfars Clauses 252.225-7008 And 252.225-7009. eligibility the Applicable Naics Code For This Requirement Is 541330 With A Small Business Size Standard Of $25.5m. Large And Small Businesses Interest Is Being Requested. The Product Service Code (psc) Is C211. submission Details interested Businesses Should Submit A Brief Capabilities Statement Package (no More Than Ten 8.5 X 11 Inch Pages, Font No Smaller Than 10 Point) Demonstrating Ability To Provide The Products/systems Listed In This Technical Description. Documentation Should Be In Bullet Format. No Phone Or Email Solicitations With Regards To The Status Of The Rfp Will Be Accepted Prior To Its Release. your Response To This Sources Sought, Including Any Capabilities Statement, Shall Be Electronically Submitted To The Contracting Officer, Alex Norris, In Either Microsoft Word Or Portable Document Format (pdf), Via Email Alex.norris@us.af.mil No Later Than 1:00 P.m. Pdt On 14 January 2025 And Reference This Synopsis Number In Subject Line Of E-mail And On All Enclosed Documents. Information And Materials Submitted In Response To This Request Will Not Be Returned. Do Not Submit Classified Material. if Your Organization Has The Potential Capacity To Provide The Required Products/systems, Please Provide The Following Information: 1) Organization Name, Address, Primary Points Of Contact (pocs) And Their Email Address, Fax, Web Site Address, Telephone Number, And Type Of Ownership For The Organization; And 2) Tailored Capability Statements Addressing The Requirements Of This Notice, With Appropriate Documentation Supporting Claims Of Organizational And Staff Capability. If Significant Subcontracting Or Teaming Is Anticipated In Order To Deliver Technical Capability, Organizations Should Address The Administrative And Management Structure Of Such Arrangements. all Data Received In Response To This Sources Sought That Is Marked Or Designated As Corporate Or Proprietary Will Be Fully Protected From Any Release Outside The Government.
Closing Date14 Jan 2025
Tender AmountRefer Documents 

PUBLIC BUILDINGS SERVICE USA Tender

Others
Corrigendum : Closing Date Modified
United States
Details: 47pb0024r0049amendment 007 amendment 7 Will Attach Three Documents. Attachment 127 Is The Updated Rfi Spreadsheet. Look Specifically At The Last Tab Dated 12/17/2024 For Responses To Various Offeror's Questions.attachment 128 Will Replace Attachment 26 A.0 Sow Cmc Houlton Lpoe Final 2024 08 02 And Is Titled As "128. A.0 Sow Cmc Houlton Lpoe Final Revised 2024 12 17." Note That The Cover Page Incorrectly Still Shows The Previous Date Of August 2, 2024. Attachment 129 Will Replace Attachment 77. Exhibit D 2325-gsa-houlton Me Lpoe_design Options By Specifically Updating Page 2 And Page 3 In Item 77. It Will Be Added As Attachment 129. Exhibit D 2325-gsa-houlton Me Lpoe_design Options. As A Reminder, Amendment 6 Stated Which Attachments Were Deleted (78 Through 94) As Those Are The Updated Files That May Have Been Duplicated. We Are Not Be Reloading Any Of Those Files That Replaced The Deleted Files. 47pb0024r0049amendment 006 the Contracting Officer Has Approved An Extension To January 16, 2025, 2:00 Pm Est For Receipt Of Proposals. The Following Changes Have Been Made: Attachments 78 Through 94 Have Been Deleted In Their Entirety And Replaced With Updated Attachments From The Final Concept Development Documents. The Following Attachments Were Updated And Numbered 99 Through 102; 104 Through 108a; 110 Through 123; And 125 Through 129.specifically, Attachment 126. Houlton Lpoe Cmc Rfi Tracker Sheet Is Updated Through December 6, 2024 Only As Shown Under The Last Tab Of That Document.access To These Documents Will Be Contained Through The Google Drive: Houlton Cmc Secure Documents That May Have Been Granted To Offerors If Already Requested. If You Have Not Completed A Form B And Cbp Nda Form, Please Do So Access Can Be Provided To These Documents. if You Have Any Problems With Access, Please Contact Paul Murphy At Paul.murphy@gsa.gov. 47pb0024r0049amendment 005 the Contracting Officer Has Approved An Extension To December 12, 2024, 2:00 Pm Est For Receipt Of Proposals.additionally, Attachment 99. Houlton Lpoe Cmc Rfi Tracker Sheet 2024 11 22 Is Provided As The Government Response To Additional Comments/question By An Offeror And Hereby Shared With All Offeror's. 47pb0024r0049amendment 004 the Contracting Officer Has Approved An Extension To December 5, 2024, 2:00 Pm Est For Receipt Of Proposals. 47pb0024r0049amendment 003 added Attachments 33. A.7 Gsa P-100 2021 With 2022 Addendum Final (326), 35. D.4 P100 Submittal Matrix V10 cmc 2021, 58. Gsa Program Development Study 100% Pds Report 2021 02 08 (559), And 69. Roof Moisture Analysis Report houlton 2020 06 23 (22) Did Not Get Posted On 10/04/2024. They Are Added Under Amendment 0003. additionally, Attachment 98. Rfi Site Visit Tracker Is Provided As The Government Response To Rfi By Offerors. 47pb0024r0049amendment 002 added Attachment 72 Final Houlton Pre-proposal Meeting Presentation 2024 10 10. A Courtesy Copy Was Sent Via Email To People That Were On The Invitation List Even If They Did Not Attend The Individual Meetings. It It Attached Here So All Contractors, Whether They Requested Attendance Or Not, Will Know Of The Discussions. added Clarifying Price Proposal Language Below: under Volume Ii - Price Proposal - Part 3 - Price Proposal "other Than Certified Cost And Pricing Data" Documentation. Uniformate Ii Classification Framework. under Volume Ii - Price Proposal (1) Contents · Price Proposal On Sf-1442 (signed) â Solicitation, Offor, And Award. The Price Proposal Shall Consist Of The Sf-1442 And The Agreement. Indicate The Total Contract Price From The Completed Contract Price Form In Block 17 Of The Sf 1442, Which Must Be Fully Executed By The Offeror. · A Completed Contract Price Form Included As Part Of The Sf-1442 And In Section Ii Of The Agreement. · Other Than Certified Cost And Pricing Dataâ Documentation. Cost Proposals Must Be Organized And Submitted Using The Uniformat Ii Classification Framework Developed By The American Society For Testing And Materials (astm), Specifically Under The Designation E1557. Costs Shall Be Provided For Project Work At The Level 3 Individual Elements Classification (e.g. A1010 Standard Foundations), And Summarized At The Level 2 Classification (e.g. A10 Foundations). Any Additional Costs That The Offeror Believes Must Be Included Shall Be Well Defined And Included At The Summary Level. the Ira Designated Clins Shall Be Broken Out Separately From The Remaining Requirement. our Uniformat Ii â Level 3 Detail Reference Guide Is Provided To Assist You With This Documentation (see Attachment 97). note: The Price Proposal Must Be Separately Bound From The Phase Ii Technical Proposal. iv.l. Requiring Certified Cost Or Pricing Data [15.403-4] iv.l.a. Far 52.215-20 Requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data (nov 2021), Alternate Iv (oct 2010) (a) Submission Of Certified Cost Or Pricing Data Is Not Required. (b) Provide Data Described Below: Cost Proposals Must Be Organized And Submitted Using The Uniformat Ii Classification Framework Developed By The American Society For Testing And Materials (astm), Specifically Under The Designation E1557. Costs Shall Be Provided For Project Work At The Level 3 Individual Elements Classification (e.g. A1010 Standard Foundations), And Summarized At The Level 2 Classification (e.g. A10 Foundations). Any Additional Costs That The Offeror Believes Must Be Included Shall Be Well Defined And Included At The Summary Level. the Ira Designated Clins Shall Be Broken Out Separately From The Remaining Requirement. our Uniformat Ii â Level 3 Detail Reference Guide Is Provided To Assist You With This Documentation (see Attachment 97). added Attachment 75 Presolicitation In Sam 2024 08 27. added Attachment 76 Pre-proposal Site Visit Attendance Sheet 2024 10 17 added Attachments 77 - 94 Provide Additional Design Information As Requested. 77 Exhibit D_2325-gsa-houlton Me Lpoe_design Options; 78 Exhibit D.1_lpoe Houlton Concept Development Design Package; 79 Exhibit E_ Lpoe Houlton Concept Development Calculation Package; 80 Exhibit E.1_mpbroof Structure; 81 Exhibit F_mep Basis Of Design Narrative; 82 Exhibit G_mep Concept Development Design Alternates; 83 Exhibit G.1 Mepfp Equipment; 84 Exhibit H_houlton Lpoe_facade Options & Ira Lec Materials_concept Development Memo; 85 Exhibit J Houlton Leed Nc Scorecard; 86 Exhibit J.1_gsa Sustainable Buildings_checklist; 87 Exhibit J.2_conceptdevelopmentenergyanalysisnarrative; 88 Exhibit U_(cui) Houlton Me Dbt_msr_fsl; 89 Exhibit V_houlton Lpoe Pre-renovation Rbm Survey Report 2024-06-25; 90 exhibit X_2325-gsa-houlton Me Lpoe_mechanical-electrical Resilience_rev 1; 91 Exhibit Y_flood Level Diagram From 2024-07-02_2325-gsa-houlton Me Lpoe_mechanical-electrical Resilience_rev 1; 92 Exhibit Z_(cui) Passwords; 93 Exhibit Aa_national Operational Excellence Checklists_concept Development; And 94 Exhibit Bb_houlton Me Lpope_concept Development Specifications Table Of Contents. several Required A Completed Form B Under Attachment 5 And A Completed Cbp Nda Authorization Letter Signed For Access. If You Have Alreadysubmitted These To The Contracting Officer Prior To October 24, 2024, Just Email Again For Access. note: The Facade - Precast Panels And Terracotta Rainscreen - Colors Will Be Selected In The Next Phase By The Architecture Engineering (ae) Design Firm Marvel Architectures. Additionally, Hvac - Vrf, The A/e Will Select The Vendor That Meets Most Of The Gsa Requirements (hvac And Controls). added Attachment 95 Ira Program Construction Solicitation Desk Guide - Dated October 1, 2024. This Is A Revision of Any Previous Construction Solicitation Desk Guide That Provides Guidance For Ira-funded Construction Projects that Contain Low Embodied Carbon (lec) Materials, Including Pre-solicitation, Solicitation, And Agreement Guidance, evaluation Factor Requirements, Review And Approval Requirements, And Post-award Requirements. It Also Includes standard Scope Of Work Language For Actions Related To The Construction Project (design Services, Cma, And Cxp services) For Lec Materials, High Performance Green Buildings, And Emerging And Sustainable Technology Projects. added Attachment 96 Houlton Lpoe Cmc Rfi Tracker Sheet 2024 10 23 - Conference Rfis Containing Questions asked By Offeror's And Official Government Responses For The Pre-proposal Conference Only. added Attachment 97 Solicitation Document L - Uniformat Ii - Level 3 Detail Reference Guide Reference Above In pricing Information Area. 47pb0024r0049amendment 001 the Following Changes Were Made Effective On 10/08/2024: a. Replaced 5. Form B - Request For Construction Documents 2024 10 04 With 5. Form B - Request For Construction Documents 2024 10 08 And Unlocked It. b. Replaced6. Cbp Non-disclosure Agreement Form 2024 10 04 With6. Cbp Non-disclosure Agreement Form 2024 10 08 And Unlocked It. c. Replaced 7. Pre-proposal Conference R1 2024 10 04 With 7. Pre-proposal Conference R1 2024 10 08 Which Provides The Following Clarification: 1. Thepre-proposal Conferencewill Be Held Virtually Onoctober 10, 2024 At 10:00 Am. 2.questions/requests For Information/clarificationsfrom The Offerorswillbe Due Nltoctober 18, 2024, At 2:00 Pm.these Should Be Sent Topaul.murphy@gsa.gov. 3. The Government Will Post Responses To The Offeror'squestions/requests For Information/clarificationsas An Amendment To The Solicitation In Sam.govon Or About October 25, 2024. d. Replaced 8. Pre-proposal Site Visit R1 2024 10 04 With Attachment - 8. Pre-proposal Site Visit R1 2024 10 08 Which Provides The Following Clarification: 1. The Site Visitwill Be Held Onoctober 17, 2024 At 1:00 Pm. 2.questions/requests For Information/clarificationsfrom The Offerorswillbe Due Nltoctober 25, 2024, At 2:00 Pm.these Should Be Sent Topaul.murphy@gsa.gov. 3. The Government Will Post Responses To The Offeror'squestions/requests For Information/clarificationsas An Amendment To The Solicitation In Sam.govon Or About November 1, 2024. e. Added New Attachment - 73. Contract Price Form Spreadsheet 2024 08 28. f. Added New Attachment - 74. Cost Accounting Standards Board Disclosure Statement Casb Ds-1 Omb Form Number 0348-0051 a. The Corrected Proposal Due Date Is Thursday, November 21, 2024. this Is A Construction Manager As Constructor (cmc) / Construction Manager As Risk (cmar) Services For U.s. Customs And Border Protection (cbp) Land Port Of Entry (lpoe) At Houlton, Maine. The Cmc/cmar Services Is For The Facilities Repair And Alterations Project And Includes Requirements For Design Phase Services And Construction Phase Services. design Phase Services Will Be Awarded On A Firm-fixed Price Basis. Construction Phase Services Will Be Awarded With A Guaranteed Maximum Price (gmp). This Project Is Part Of The Bipartisan Infrastructure Law (bil) And Is Also Targeted For Inflation Reduction Act (ira) Funding. this Solicitation Sets Forth Requirements For Proposals For A Contract To Construct The Project Described In The Solicitation Documents. Proposals Conforming To The Solicitation Requirements Will Be Evaluated In Accordance With The Method Of Award Set Forth Herein. the Government Will Award The Contract To The Selected Offeror, Subject To The Conditions Set Forth Herein. the Offeror's Proposal Submitted In Response To This Solicitation Shall Constitute A Firm Offer. No Contract Shall Be Formed Unless And Until The Contracting Officer Has Countersigned The Sf 1442 Submitted By An Offeror And Delivered Back To The Contractor, A Copy Of The Sf 1442 With Original Signatures Together With The Agreement Reflecting The Offeror's Proposed Prices. offers Providing Less Than One Hundred And Twenty (120) Calendar Days For Government Acceptance After The Date Offers Are Due Will Not Be Considered And Will Be Rejected. the Magnitude Of Construction Is Estimated Within The Range Of $22,000,000 And $32,000,000. Offeror's Are Cautioned That Price Proposals Exceeding This Range May Be Determined Ineligible For Award Based On Budgetary Limitations. This Range Does Include Potential Inflation Reduction Act (ira Funding). price Proposal Exceeding This Range May Be Eligible To Have Their Technical And Price Proposal Evaluated Unless The Contracting Officerdetermines That The Number Of Proposals That Would Otherwise Be In The Competitive Range Exceeds The Number At Which An Efficient Competition Can Be Conducted. The Contracting Officer May Limit The Number Of Proposals In The Competitive Range To The Greatest Number That Will Permit An Efficient Competition Among The Most Highly Rated Proposals. technical And Price Proposals Must Be Clearly Labeled And Must Be Sent As Separate Attachments So They Can Be Evaluated Separately. Failure To Do So Will Determine The Offeror's Submission As Non-responsive And Will Be Eliminated. The Contracting Officer And/or Contracts Specialist Will Not Be Responsible To Separate Any Technical Document That Contains Pricing Information. this Solicitation Is Not Set Aside For Small Business, However, Both Small And Large Businesses Are Encouraged To Participate. Offeror's Must Ensure That Sam.gov Shows That The Offeror Has North American Industry Classification System (naics) Code 236220 (commercial And Institutional Building Construction) And Meets The Small Business Size Standard Is $39.5 Million Average Annual Receipts. It Is The Responsibility Of The Offeror To Ensure This Information Is Updated At The Time Of Submission Of Their Proposal. see The "a. Presolicitation In Sam 2024 08 27" For Additional Details. Changes To The Presolicitation Include:the Solicitation Posting Date Has Changed From September 26, 2024 To October 3, 2024.the Proposal Submission Date Has Changed From November 26, 2024, 2:00 Pm Est To November 11, 2024, 2:00 Pm Est. for Access To Public Building Services (pbs) General Services Administration (gsa) Documents, See "b. Form B - Request For Construction Documents 2024 08 07" That Must Be Completed In Its Entirety And Signed.failure To Complete This Document In A Timely Manner Does Not Warrant Any Request For An Extension To The Proposal Due Date. The Document Must Be Sent To Paul.murphy@gsa.govbefore Access To These Pbs/gsa Documents Are Provided. additionally, The Department Of Homeland Security, U.s. Customs And Border Protection, Facilities Management And Engineering Field Operations, Facilities Program Management Office, Non-disclosure Agreement. See "6. Cbp Non-disclosure Agreement Form 2024 10 04" That Must Be Completed In Its Entirety And Signed. This Document Must Be Sent To Lawrence.a.comiskey@cbp.dhs.gov And A Copy Sent To Paul.murphy@gsa.gov Before Access To Cbp Documents Are Provided. a Pre-proposal Conference Is Scheduled For Thursday, October 10, 2024, At 10:00 Pm Est. A Letter Is Attached To This Solicitation "7. Pre-proposal Conference 2024 10 04". a Pre-proposal Site Visit Is Scheduled Forthursday, October 17, 2024, At 01:00 Pm Est.a Letter Is Attached To This Solicitation "8. Pre-proposal Site Visit 2024 10 04". there Are 71 Attachments To This Solicitation.
Closing Date16 Jan 2025
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+2Others, Civil Works Others
United States
Description: Project Labor Agreements (pla S) Survey And Request For Contractor Capability Statement Package this Is A Sources Sought Notice For Market Research Only. no Award Will Be Made From This Sources Sought Notice. this Sources Sought Notice (ssn) Is For Market Research Purposes In Accordance With Federal Acquisition Regulation (far) Part 10 And Far 15.201(e), To Determine The Availability And Technical Capabilities Of Qualified Sources. It Does Not Constitute A Solicitation And Is Not To Be Considered As A Commitment By The Government. All Firms Responding To This Notice Are Advised That Their Response To This Notice Is Not A Request That Will Be Considered For Contract Award. All Interested Parties Will Be Required To Respond To The Resultant Solicitation Separately From Their Response To This Notice. jefferson Barracks National Cemetery, sylvan Springs, Phase 1a Expansion project Scope the U.s. Department Of Veterans Affairs (va) Seeks Expressions Of Interest For A Construction Contract At Jefferson Barracks National Cemetery, Sylvan Springs, Phase 1a Expansion With The Use Of A Project Labor Agreement (pla). The North American Industry Classification System (naics) Of 237990 (other Heavy And Civil Engineering Construction) With The Size Standard Of $45.0 Million. The Approximate Project Duration Will Be 912 Calendar Days From The Notice To Proceed. The Estimated Magnitude For This Project Is Between $50,000,000 And $100,000,000. Va Is Considering Conducting This Acquisition As A Best Value With Tradeoffs In Accordance With Far Part 15, Contracting By Negotiation. project Description: the Purpose Of This Phase 1a Expansion Project For Jefferson Barracks National Cemetery Is To Enable The Existing National Cemetery To Continue To Provide Burial Services For Eligible Veterans In Missouri. Jefferson Barracks National Cemetery Is Located Near St. Louis, Missouri. the National Cemetery Administration (nca) Contracted This 33.6-acre Cemetery Expansion Project To Increase Burial Capacity Of Jefferson Barracks National Cemetery (jbnc) To Serve Veterans In The St. Louis Area. This Cemetery Expansion Project Identified On New Land. The Proposed Development Will Provide Continued Service To An Estimated Fiscal Year (fy) 2024 Veteran Population Of Approximately 208,000 Within A 75-mile Service Area. This Proposed Development Will Provide An Additional 15 Years Of Continued Burial Service To A Veteran Population Who Has Been Served By This National Cemetery Since 1827. this Project Will Provide For An Additional 15-year Inventory Of The More Efficient Casketed, Double-depth, Pre-placed Crypts Before Depletion Of The Current Inventory, And Extend The Full Range Of Burial Options Until Fy 2044, As Well As Provide Several Nominal Cemetery Operational And Infrastructure Improvements Within The Older Cemetery Grounds. this Project Will Provide For The Following Elements And Features: base Bid General Construction: the Base Bid Work Of This Contract Includes Phased Requirements. These Phases Are Referred To As Eto And Remainder Of The Work. The Eto Shall Be Completed Within The Established Time Frame Indicated In The Contract. Completion Of The Eto Work Will Follow Procedures Like Those For Final Completion And Acceptance, With The Facilities Within The Eto Being Completed And Turned Over To The Cemetery For Use To Begin Operation Of The Cemetery While The Remaining Work Is Completed. Eto Shall Be Completed And Accepted By Nca For Operation Within 252 Calendar Days From Notice To Proceed. While The Work Of The Eto Is Being Performed, Work For The Remainder Of The Project Can Also Be Performed. work Of The Contract Includes Site Demolition, General Construction, Relocation And Installation Of New Site Utilities, Installation Of Pre-placed Burial Crypts, Columbarium Niches, Roadway Improvements, New Roads, Walks, Grading, Drainage, Site Furnishings, Landscaping And Irrigation Necessary Removal Of Existing Structures And Construction And Certain Other Items And All Other Work Necessary To Construct The Project. The Contractor Shall Obtain State/local Construction Permitting As Required And Conduct All Protected Habitat Preservation, Wetlands, And Mitigation Efforts As Required To Meet Governing Body Mandates. By The End Of The Performance Period All Work Shall Be Satisfactorily Completed And Ready For Custody, Transfer, And Acceptance By Nca. All Punch List Items Shall Be Satisfactorily Addressed, All Commissioning Completed, And All Training Accomplished. replace And Upgrade Carpeting And Painted Finishes In The Administration/ Pic Building. Replace Select Electrical Service Panels In Maintenance Buildings 3001, 3002, And 3003. interment Areas: casketed Remains: a) Approximately 18,500 Pre-placed Crypt Full Casket Gravesites b) Approximately 2,100 Traditional Casket Gravesites cremated Remains: a) Approximately 10,900 In-ground Cremation b) Approximately 5,000 Columbarium Niches base Bid Furnish Pre-placed Crypts: procure, Manufacture, Deliver, Off-load And Store Furnish And Deliver To The Site All Pre-placed Crypts. additive Items Subject To Budget Adequacy: additive #1 Maintenance Yard: install Maintenance Storage Yard And Associated Site Work, Including But Not Limited To Pavements, Curbs, Drainage, Fencing And Gates, Signage, Landscaping, And Irrigation. additive #2 Storage Building: install Maintenance Material Storage Building Including But Not Limited To Sitework, Pavements, Curbing, Concrete Foundations, Concrete Walls, Structural Steel, And Standing Seam Metal Roofing. additive #3 Satellite Maintenance Building: install Satellite Maintenance Building And Associated Site Work Including But Not Limited To Sitework, Utilities, Concrete Foundations, Concrete Slab, Engineered Metal Building, Hvac System, Concrete Masonry Walls, Metal Wall Panels, Standing Seam Metal Roof, Doors, Windows, Interior Finishes, Landscaping, Irrigation, Signage And All Other Work Necessary To Construct The Building. additive #4 Demolish/replace Committal Shelter #4: demolish And Replace Committal Shelter #4(in Main Cemetery) Along With Associate Sitework, Concrete Foundations, Concrete Piers, Curbs, Paving, Standing Seam Metal Roof, Landscaping, Irrigation, Site Furniture And Signage. --- End Of Project Scope --- project Labor Agreement (pla): a Pla Is Defined As A Pre-hire Collective Bargaining Agreement With One Or More Labor Organizations That Establishes The Terms And Conditions Of Employment For A Specific Construction Project And Is An Agreement Described In 29 U.s.c. 158(f). federal Acquisition Regulation (far) 22.503 Policy: (a) Project Labor Agreement (pla) Is A Tool That Agencies May Use To Promote Economy And Efficiency In Federal Procurement. Pursuant To Executive Order 13502, Agencies Are Encouraged To Consider Requiring The Use Of Project Labor Agreements In Connection With Large-scale Construction Projects. (b) An Agency May, If Appropriate, Require That Every Contractor And Subcontractor Engaged In Construction On The Project Agree, For That Project, To Negotiate Or Become A Party To A Project Labor Agreement With One Or More Labor Organizations If The Agency Decides That The Use Of Project Labor Agreements Will- (1) Advance The Federal Government's Interest In Achieving Economy And Efficiency In Federal Procurement, Producing Labor-management Stability, And Ensuring Compliance With Laws And Regulations Governing Safety And Health, Equal Employment Opportunity, Labor And Employment Standards, And Other Matters; And (2) Be Consistent With Law. (c) Agencies May Also Consider The Following Factors In Deciding Whether The Use Of A Project Labor Agreement Is Appropriate For The Construction Project: (1) The Project Will Require Multiple Construction Contractors And/or Subcontractors Employing Workers In Multiple Crafts Or Trades. (2) There Is A Shortage Of Skilled Labor In The Region In Which The Construction Project Will Be Sited. (3) Completion Of The Project Will Require An Extended Period Of Time. (4) Project Labor Agreements Have Been Used On Comparable Projects Undertaken By Federal, State, Municipal, Or Private Entities In The Geographic Area Of The Project. (5) A Project Labor Agreement Will Promote The Agency S Long Term Program Interests, Such As Facilitating The Training Of A Skilled Workforce To Meet The Agency S Future Construction Needs. (6) Any Other Factors That The Agency Decides Are Appropriate. see Far Provision: 52.222-33 Notice Of Requirement For Project Labor Agreement And Far Clause 52.222-34 Project Labor Agreement For Further Details. project Labor Agreement (pla) Questionnaire (please Respond To The Questions Below) 1. Is Your Company Familiar With Project Labor Agreement (pla) And Its Use On Construction Projects? yes/no comments: 2. Would Your Company Likely Submit A Proposal For The Va Construction Solicitation That Requires The Use Of A Pla? yes/no comments: 3. If Va Requires A Pla, Would Your Proposed Construction Cost Likely To Increase Or Decrease And What Is The Likely Percentage Of Cost Increase Or Decrease? comments: 4. Does The Va Requirement To Use Of A Pla On A Construction Project Restrict Competition? yes/no comments: 5. Do You Expect Subcontractor Resistance Should Va Requires The Use Of A Pla On This Construction Solicitation? yes/no comments: 6. Do You Have Additional Comments Regarding The Use Of A Pla For This Project? yes/no comments: --- End Of Pla Questionnaire --- contractor Capability Statement Package: firms Interested In Submitting Their Capabilities For This Project Must Include The Following Information Compiled Into A Contractor Capability Statement Package: cover Letter/introduction That Includes Company Name, Address, System For Award Management Database At Https://www.sam.gov/portal/sam Sam.gov Unique Entity Id Numbers, Point Of Contact With Phone Number And E-mail Address. business Size Determination. State Your Firm S Socioeconomic Type And Business Size: Such As (service-disabled Small Business, Veteran Owned Small Business, Small Business, Woman Owned Small Business, Large Business, Etc.). if Identifying As A Service-disabled Veteran-owned Small Business (sdvosb) Firm (or Jv), Veteran Owned Small Business Firm (vosb) (or Jv), You Must Be Registered In The U.s. Small Business Administration Veterans Small Business Certification (vetcert) Database At: Https://veterans.certify.sba.gov. Provide Evidence Of Certification. bonding Capacity: provide A Letter From Your Surety, On Surety Letterhead That Affirms Your Company S Bonding Capacity To Furnish A Bid Bond, Payment Bond, And Performance Bond For A Project Between $50 - $100 Million. contractor Capability Statement Shall Include, But Not Be Limited, To The Following: corporate Experience: provide Projects In The Past Five (5) Years That Are Valued At Approximately $30m Or Greater In Construction Costs, And demonstrate Your Company S Experience Constructing Or Managing The Construction Of Projects That Match The Following Characteristics: a. Va/nca National Cemetery Projects. (if No National Cemetery Experiences Provide Projects Similar Such As Regional Parks, Multiple Sport-fields Complexes, Or Multi-phased Land Development Projects Larger Than 10 Acres). b. State/local/private Cemetery Projects. c. Projects Requiring The Construction Of Multiple Features Typical To A National Cemetery Such As Pre-cast, Placed Crypts; Columbaria Niches, Memorial Walls, Cast Or Natural Stone Columbarium Caps, Cast Or Natural Stone Veneers, Turf (sod) Placement And Maintenance, Tree And Shrub Placement And Maintenance, Irrigation Systems With Mainlines Exceeding 4-inch In Diameter, Irrigation Central Control Systems, Roadways, Wetlands/environmental Remediation Or Restoration. d. Building Construction, Building Remodel, Mass/fine Grading & Excavation, Site Utilities, Paving, New Golf Courses Or Expansions, Regional Parks, Multiple Sport-fields Complexes, Or Multi-phased Land Development Projects Larger Than 10 Acres. describe Your Experience With As Many Of The Elements Of Construction Identified, Below, As You Can: i. Mass/fine Grading & Excavation Site Utilities prefer To See Projects Involving Earth Work And Grading For Cemeteries, Parks, Or Site Development Projects Of At Least 10 Acres. ii. Site Utilities demonstrate Experience With Storm Water Management Systems And Site Drainage For Flat Sites. demonstrate Experience With Potable Water Distribution From A Well, Or Municipal Source. demonstrate Experience With Sanitary Waste Systems, Both Powts & Municipal. iii. Paving paving Projects May Include Private & Local Asphalt Roads; Concrete Curb & Gutter, Asphalt Parking Lots, And Concrete Sidewalk, On Site Development Projects Of At Least 10 Acres. experience In Missouri Or Similar Climates Is Preferred, But Not Required. iv. Landscaping landscaping Projects Involving Planting And Lawn Installation For Cemeteries, Parks, Golf Courses Or Other Site Development Projects Of At Least 10 Acres In Climates Similar To St. Louis, Missouri. v. Irrigation irrigation System Installation For Cemetery, Park, Golf Course, Or Other Types Of Development Sites Of At Least 10 Acres. Include Experience With Irrigation Ponds, Wells, Pumping Systems If You Have It. vi. Precast Concrete Burial Components demonstrate Experience With Successful Fabrication And Installation Of Precast Crypt And Precast Columbarium, If You Have It. vii. Phasing And Continuity Of Operations demonstrate Experience With Best Practices To Successfully Complete Phased Site Work At An Occupied And Functioning Facility In A Way To Minimize Noise And Dust And Minimize Detrimental Effects On Cemetery Operations. current Project List: provide A Detailed List Of Ongoing Contracts & Projects. The Description Shall Include: project Type award Amount award Date estimated Completion Date ---- End Of Contractor Capability Statement Package --- please Submit Your Comments To The Pla Questionnaire And The Contractor Capability Statement Package Via Email To Joshua Gibson, Contracting Officer, At Joshua.gibson2@va.gov, No Later Than 3:00 Pm Et On January 6, 2025, In The Subject Line State Jefferson Barracks National Cemetery, Phase 1a Expansion And [company Name]". Note That This Mailbox Will Only Accept E-mails Of 15mb In Size Or Smaller, So You May Break Your Submission Into Multiple Emails If Needed. All Information Concerning This Requirement, When It Proceeds To Solicitation, Will Be Posted Only On The Federal Business Opportunities Website (https://sam.gov). --- End Of Sources Sought Notice ---
Closing Date6 Jan 2025
Tender AmountRefer Documents 

PUBLIC BUILDINGS SERVICE USA Tender

Civil And Construction...+1Building Construction
United States
Details: This Is A Sources Sought Notice. No Proposals Are Being Requested Or Will Be Accepted In Response To This Posting. If You Are Interested In Proposing On The General Scope Of Work Stated Below For A Design-build Project, Please Respond By Email Only To Krista.miller@gsa.gov. Please Provide Your Bonding Capacity, A Capability Statement, And Your Small Business And Small Business Socioeconomic Status, If Any. Please Include In Your Capability Statement Projects Which Your Firm Has Completed That Are Particularly Relevant To This Scope Of Work, Especially Involving Exterior Structural And Glazing Improvements, And/or Performed In Hawaii. general Statement Of Work Summary: the Prince Jonah Kuhio Kalaniana’ole (pjkk) Federal Building And Courthouse Is Located At 300 ala Moana Blvd., Honolulu, Within The Hawaii Capital District And On The Outskirts Of The Downtown central Business District. This Reinforced, Cast In Place Concrete With Concrete Masonry And Glass curtain Walls Is A Two-building Mid-century Modern Complex Originally Constructed In 1977. The illuminated Entry Pavilion Was Originally Designed By Gensler Sf And Constructed By Swinerton construction In January 2015. The Illuminated Entry Pavilion Design Was An Elegant, Iconic Aia award Winning Design That Unified Two Separate Entries Into A Single, Sky Lighted And Transparent entrance For The Pjkk Complex. The Single Portal/pavilion Simplified The Circulation For The Public and Created A Strong Sense Of Entry For Pjkk. on April 6, 2021 A Fire Occurred At The Entry Pavilion That Created Significant Damage. On January 24, 2022, Clifford Planning Architecture Completed A Fire Investigation Report That Stated “it Is probable The Entry Pavilion Fire Initiated Was A Result Of An Electrical Fault Within The Led Light Panel installed Adjacent To The Bottom Panel Of The South Wall Of The Entry Pavilion. Low Level Arcing Over a Period Of Time Was The Likely Source Of Heat For Ignition Of The Acrylic Panel Material” (see volume 4 – Fire Investigation). As Further Defined In The Fire Investigation Report, There Was Fire damage To Architectural Finishes And Structural Members. The Scope Of Work For The Entry Pavilion includes, But Is Not Limited To, Installing (2) Temporary Covered Entry Tunnels To The Existing United states Marshal Service (usms) And Federal Protection Services (fps) Security Check-point locations, Providing Code Compliant Construction Documents And Full Design Services That Adhere to The Original Gensler Design And Architectural Appearance Of The Original Entry Pavilion, While also Making The Necessary Design Changes To Address The Issues That Contributed To The Fire And smoke Damage As Further Defined In Volume 4 - Fire Investigation. The Design Should Also include Solutions For The Following Known Building Maintenance Issues: 1. The Original Design Led Panels Were Located Behind Heavy Glass Panels That Created issues For Regular Maintenance And Care. 2. The Original Designed Entry Door Operated On A Small Pin That Would Fail And Was Difficult to Replace. in Addition To The Scope Above, The Design And Construction Of The Courthouse Hardening Upgrades To The entry Pavilion And Ground Level Windows And Doors Facing Halekauwila Street And Ala Moana Boulevard are A Requirement For This Project. The Judiciary Had Previously Sought From Congress Supplemental appropriations To Fund Enhanced Security Measures To Protect Judges And The Judicial Process In Response to The Civil Unrest Following The Murder Of George Floyd And The January 6th Attack On The U.s. Capitol. the Judicial Conference Approved Funding To Begin Enhanced Security Measure Projects To Harden courthouses. initial Stakeholders From The General Services Administration (gsa), The Administrative Office Of The U.s. courts (ao), U.s Marshals Service (usms), And The Federal Protective Service (fps) Worked Together To analyze Potential Security Measures To Be Used In This Program. This Scope Of Work Covers The countermeasures For The Pjkk Courthouse In Honolulu, Hi: 1. Windows: Impact Resistant Window Glazing System At The Entry Pavilion And ground Level Courthouse Windows And Doors Facing Halekauwila Street And Ala moana Boulevard, Excluding Ground Level Windows Along The United States marshal Service Offices And Within The Confines Of The Exterior Secured Courtyard: ● Windows / Doors / Frames – Shall Meet A Minimum 15-minute Forced entry Resistance Per Astm F3038 Or Dept Of State (dos) sd-std.01.01 Rev G (amended) – Forced Entry Resistance Is The standard That Shall Apply. ● The Contractor Shall Install A New Shatter Break Resistance Riot Glazing system ● Contractor Is Responsible To Field Verify And Measure Each Opening. 2. Exterior Doors And Hardware (see Volume 2b_existing Pavilion Design drawings For Specific Locations): ● All Exterior Pavilion Entry Doors And Interior Courthouse Pavilion Vestibule doors Shall Be Equipped With Hardware And Controls To Engage electro-magnetic And/or Electro-mechanical Remote Locks. ● Remote Locks Shall Give The Ability For The Court Security Officers And The usms To Lock All Doors Immediately In Case Of An Emergency. ● Remote Lock Override Control Shall Run To The Main Usms / Cso Control room the Courthouse Hardening Upgrades Will Upgrade The Ground Level Courthouse Windows And doors And Replace All Window, Exterior Doors, And Hardware Included In The Original Gensler designed Pjkk Entry Pavilion. the Forced Entry Resistance Doors And Windows Shall Meet A Minimum 15 Minute Forced Entry resistance In Accordance With Astm Standard F3038-21, With The Following Exception. Astm standard F3038-21 Requires A Full Scale Test For Each Unique System Size And Configuration, however, If The Actual Overall System Dimensions Are Within 6” (both Height And Width Dimension) of Another Successfully Tested System Meeting The Requirements Of Astm Standard 3038-21, And the System Components Are Of Similar Size And Makeup, The Proposed System Shall Be Considered acceptable. Support Documentation Shall Be Provided Prior To Installation. the Construction Services Scope Of Work Includes Demolition Of The Remaining Pavilion Structure, build-out Of (2) Temporary Tunnels To Access The Existing Usms And Fps Security Check-points, the Build-out Of The New Entry Pavilion, Installation Of The Courthouse Hardening Window And Door upgrades, Including But Not Limited To Structural, Architectural Finishes, Lighting, Mechanical, electrical, Plumbing, Fire And Life Safety, And Data/cabling Infrastructure. the Federal Building And Courthouse Must Remain Fully Operational Throughout Design And construction. All Construction Work Related To This Project Shall Be Scheduled From 5:00 Pm To 7:00 am, After Normal Building Operation Hours To Minimize Disruptions To Building Occupants And To maintain Public Safety. Normal Building Operation Hours Are From 7:00 A.m. To 5:00 P.m. weekdays. the Project Delivery Method Is Design-build (db). the Db Contractor Shall Provide All Supervision, Labor, Materials, Equipment, And Testing Required to Accomplish The Design And Construction For The Pjkk Entry Pavilion And Courthouse Hardening project. design Services Shall Include, But Are Not Limited To, Design And Certification By A State Of Hawaii licensed Architect-engineer (a/e), Design Reviews, Weekly Progress Meetings, Design development, Construction Documents, Basis Of Design Documents, Site Investigation, Site measurements And Verification, Code Compliance, Reproduction Services, Consultant Coordination, contract Administration, Contract Close-out, Record Drawings And As-builts. construction Services Shall Include, But Are Not Limited To, Complete And Timely Submission Of security Clearance Applications For Workers (hspd-12 And Tenant Agency Review), Project schedule, Cost Estimating, 3-week Look Ahead Schedules, Demolition, Site Supervision, Drywall, mechanical, Electrical, Automatic Sprinkler System, Architectural Finishes, Submittal Samples, submittal Schedule, Hvac, System Balancing, Structural, Fire And Life Safety, Security Infrastructure, protocols For Utility Outages, Separation Of Utilities To Avoid Impacts To Occupied Areas, Temporary barricade Plan, Noise Mitigation, Clean Up After Work, Lead Weekly Meetings And Provide Minutes, file And Record Management, And All Other Work To Meet The Contract Requirements.
Closing Date3 Jan 2025
Tender AmountRefer Documents 

EllisDon Construction Services Inc Tender

Aerospace and Defence
Canada
Details: Advanced Procurement Notice Future Fighter Capabilities Project (ffcp) Cfb Cold Lake, Ab (with Security Requirements) Purpose Of This Advanced Procurement Notice This Is Not A Bid Solicitation. This Is An Advanced Procurement Notice (apn) Of Potential Contracts With Anticipated Security Requirements To Provide Interested Contractors, Suppliers, And Vendors An Opportunity To Begin The Sponsorship Request Process For Potentially Obtaining The Required Security Clearance(s) That Are Anticipated. Note That There Is No Guarantee That These Contracts Will Proceed Or That Any Security Clearance(s) Will Be Granted Under The Sponsorship Process In A Timely Fashion Or Otherwise. Description Of The Project Ellisdon Construction Services Inc. (ellisdon) As The Design Builder, Along With Its Design Partner, Stantec Have Been Contracted To Provide Design Services And Constructability Oversight To Complete The Design Of The Royal Canadian Air Force (rcaf) Infrastructure That Will Support The Future Fighter Capability Project (ffcp). The Infrastructure Will Provide Shelter And A Working Environment Capable Of Supporting The Operation And Maintenance Of A Yet To Be Determined Advanced Fighter Aircraft. Design Has Progressed Significantly With Various Tender Packages Forthcoming Tentatively To Start In Q3 2024, With Project Construction Being Conditional On The Project Receiving Approval To Proceed From Dnd. details On Upcoming Projected Tender Packages To Follow Via Amendment. Prior To This, Ellisdon Is Seeking Interested Parties Consisting Of Trade Contractors, Vendors, And Suppliers To Ensure That They Have All Necessary Security Clearances In Place Prior To This As This Is A Requirement For This Project.    Description Of The Scope Of Works Project Construction Is Conditional On The Project Receiving Approval To Proceed From Dnd. Project Scope And Summary Are Noted Below. Contract Number:  71947 Title:  Modified Design Build Services For Fighter Squadron Facility Building Size: Approximately 555,000 Sf Anticipated Posting Date: q3 2024 Description: construction Of A New A Fighter Squadron Facility Consisting Of Two Fully Operational tactical Fighter Squadrons (tfs) And The Operational Training Unit (otu),  including But Not Limited to: Offices, Administrative Spaces, Mission Planning Rooms, Briefing / De-briefing Rooms, Meeting rooms, Classrooms, Auditorium, Speciality Training Rooms Including Simulators (sims) accommodations And Part-task Trainers Accommodations, Hangars, Maintenance Bay Facilities, specialty Aircraft Maintenance Labs, Shops And Storage, It Offices And Server Rooms, Building support Spaces, And Common Spaces. This Work Package Will Also Include The Construction Of Nearby Airfield Pavements, Apron And Taxiway Access Lane Edge Lighting, And Apron Flood Lighting consisting Of Concrete And Asphalt. Construction Of Infrastructure Will Encompass The Following Scopes Of Work. Scope Of Work, Using Masterformat Divisional Breakdown As A Reference, May Include, But Are Not Limited To: Masterformat Division             Scope Of Work 01 45 00                                 Surveying 01 45 00                                 Material Testing 01 45 00                                  Third Party Inspection (roof, Structural, Geotechnical) 01 52 00                                  Temporary Facilities (trailers, Toilets, Fencing, Waste Bins) 01 54 19                                  Tower Cranes 01 54 23                                  Scaffolding 02 41 19                                  Selective Demolition 03 11 00                                  Concrete Formwork 03 15 00                                  Concrete Accessories 03 20 00                                  Reinforcing Steel 03 30 00                                  Concrete Supply 03 35 00                                  Concrete Placing & Finishing 03 45 00                                  Precast Specialties 04 00 00                                  Masonry 05 10 00                                  Structural Steel 05 30 00                                  Metal Decking 05 50 00                                  Miscellaneous Steel 05 70 00                                  Ornamental (specialized) Metals 06 20 00                                  Millwork / Architectural Woodwork 07 10 00                                  Damp Proofing & Waterproofing 07 40 00                                  Metal Roofing, Cladding & Siding 07 50 00                                  Membrane Roofing 07 80 00                                  Firestopping & Fireproofing 07 90 00                                  Caulking 08 10 00                                  Openings – Doors, Frames & Hardware 08 33 00                                  Coiling Doors & Grilles 08 34 16                                  Hanger Doors 08 35 00                                  Folding Doors & Grilles 08 36 00                                  Overhead Doors 08 40 00                                  Aluminum Entrances, Storefronts & Curtain Wall 08 80 00                                  Glazing 08 87 00                                  Window Film 09 21 16                                  Gypsum Board Assemblies 09 51 14                                  Acoustic Panels 09 60 00                                  Flooring 09 66 00                                  Tiling 09 67 00                                  Fluid Applied Flooring 09 69 00                                  Access Flooring 09 90 00                                  Painting 10 11 00                                  Visual Display Boards 10 14 00                                  Signage 10 22 19                                  Demountable Partitions 10 26 00                                  Wall, Corner, Door Protection 10 28 00                                  Bathroom Accessories & Toilet Partitions 10 51 00                                  Lockers 10 75 00                                  Flagpoles 11 30 00                                  Appliances 11 61 00                                  Theater And Stage Equipment 11 66 00                                  Athletic Equipment 11 81 29                                  Fall Arrest Systems 11 98 00                                  Detention Equipment 12 00 00                                  Furnishings 12 20 00                                  Window Coverings 14 20 00                                  Elevator & Lifts 21 00 00                                  Fire Suppression 22 00 00                                  Mechanical – Plumbing 23 00 00                                  Mechanical – Heating, Ventilation And Air Conditioning (hvac) 25 00 00                                  Integrated Automation 26 00 00                                  Electrical 28 10 00                                  Access Control            31 00 00                                  Earthworks 31 60 00                                  Piling 32 10 00                                  Paving 32 16 00                                  Sidewalk Curb & Gutter 32 31 00                                  Fencing 32 90 00                                  Landscaping 33 00 00                                  Utilities & Underground 34 73 00                                  Airfield Construction - Apron 41 22 00                                  Overhead Cranes 48 16 00                                  Geothermal Energy Project Prequalification And Anticipated Security Requirements In Order To Be Eligible To Participate In The Upcoming Project Prequalification Process, The Interested Party Will Be Required To, Among Other Things, Actively Hold All Required Security Clearance(s) At The Time Of Closing. this Will Also Be Noted in All Upcoming Solicitation Tender Documents. As Of The Date Of Posting Of This Advance Procurement Notice, The Required Security Clearance(s) Are Anticipated To Be: * for Areas Established As Security And High Security Zones - A Valid And Active Facility Security Clearance (fsc) At The Level Of Secret Granted Or Approved By The Contract Security Program (csp), Public Works And Government Services Canada (pwgsc)   * For Areas Established As Public, Reception And Operations Zones - A Valid And Active Designated Organization Screening (dos) At The Level Of Reliability Granted Or Approved By The Contract Security Program (csp), Public Works And Government Services Canada (pwgsc) Industrial Security Program (isp) Sponsorship Defence Construction Canada (dcc) Is Providing Interested Parties Early Access To The Security Clearance Application Process Through Sponsorship Under Its Industrial Security Program (isp). Accordingly, Interested Parties That Are Interested In Submitting Or Participating In A Proposal/bid For These Procurements That Fall Under This Program And That Do Not Actively Hold The Above Identified Security Clearance(s) Should Begin The Security Clearance Application Process By Applying Through Dcc’s Isp. To Begin The Security Clearance Sponsorship Process, Please Submit A Sponsorship Request Application To Dcc By Following The Steps Identified On Dcc’s Website At: Https://www.dcc-cdc.gc.ca/industry/security-requirements In Their Sponsorship Request Application To Dcc, Interested Parties Are Asked To Quote The Following Information, Among Other Things: * Contract Number As Referenced Above; And * Level Of Clearance Requested To Be Sponsored For. Sponsorship Process Timeline Sponsorship Timeline Is Currently As Follows: * Thirty (30) Calendar Days Prior To Planned Tender Closing, For Designated Organization Screening (dos); And * Sixty (60) Calendar Days Prior To Planned Solicitation/tender Closing, For Facility Security Clearance (fsc) At The Level Of Secret. Questions Any Questions Pertaining To The Isp Sponsorship Process Outlined In This Advanced Procurement Notice Can Be Addressed To: Telephone: (613) 998-8974 Email Address: Isp.sponsorship@dcc-cdc.gc.ca Any Questions, Exclusive Of Security Sponsorship, Relating To This Advanced Procurement Notice Can Be Addressed To: Scott Barabash, Cet, Gsc, Cec Senior Estimator Ellisdon Construction Services Inc. 780-444-3042 Sbarabash@ellisdon.com Disclaimer Dcc Nor Ellisdon Do Not Provide Any Assurances Or Guarantees That A Sponsorship Request Package Or A Security Clearance Application Forwarded To The Contract Security Program (csp), Public Works And Government Services Canada (pwgsc) On Behalf Of A Interested Party Will Be Successful Or Result In The Granting Of The Requested Security Clearance(s) By The Csp, Pwgsc, In A Timely Fashion. At All Times, The Processing Of A Sponsorship Request Package Or A Securiy Clearance Application Is Subject To The Respective Terms, Conditions, And Timelines Of Dcc's Isp Sponsorship Process And The Csp, Pwgsc's Security Clearance Granting Process. By Applying To Either Of The Aforementioned Processess, The Interested Party Accepts And Agrees To Bear Any Risks Associated With: (i) The Completeness Or Accuracy, Or Lack Thereof, Of Its Application Or Related Documents Submitted Under Or In Connection With Either Said Processes, And (ii) The Timeliness, Or Lack Thereof, Of Any Processing Or Granting Of Security Clearance(s) Under Or In Connection With Either Said Processes.
Closing Date6 Jan 2025
Tender AmountRefer Documents 

National Institutes Of Health Tender

Others
United States
Description: This Is A Sources Sought Notice. This Is Not A Solicitation For Proposals, Proposal Abstracts, Or Quotations. The Information Provided In This Notice Is Subject To Change And In No Way Binds The Government To Solicit For Or Award A Contract. The Government Will Not Provide Debriefs On The Results Of This Research, But Feedback Regarding The Decision To Set Aside Or Not Set Aside The Procurement Will Be Accomplished Via Pre-solicitation Synopsis Or Solicitation For These Services, As Applicable. All Information Submitted Will Be Held In A Confidential Manner And Will Only Be Used For The Purpose Intended. Points Of Contact Listed May Be Contacted For The Purpose Of Verifying Performance. the Purpose Of This Notice Is To Obtain Information Regarding: (1) The Availability And Capability Of Qualified Business Sources; (2) Whether The Businesses Are Sba Certified Hubzone Small Businesses; Sba Certified 8(a) Small Businesses; Service- Disabled Veteran-owned Small Businesses; Woman-owned Small Businesses; Or Large Business And (3) The Respective Businesses Size Classification Relative To The North American Industry Classification System (naics) Code For The Proposed Acquisition. Your Responses To The Information Requested Will Assist The Government In Determining The Appropriate Acquisition Method, Including Whether A Set-aside Is Possible. the Office Of Research Facilities (orf), The National Institutes Of Health (nih) Is Seeking Capabilities From All Categories Of Businesses For The Purpose Of Determining The Appropriate Level Of Competition And/or Small Business Subcontracting Goals For A New Requirement For An Indefinite Delivery Indefinite Quantity (idiq) Architect-engineer (ae) Multiple Award Task Order Contract (matoc) And A Blanket Purchase Agreement (bpa). the Ae Matoc Contract Has An Anticipated Composite Value Of $400m. The Applicable North American Industry Classification System (naics) Code Is 541330 (engineering Services) And The Small Business Size Is $25.5 Million. Nih Anticipates Awarding Multiple Contracts Under The Ae Matoc For The Future Professional Architect Engineering (ae) Services, As Well As Multiple Award Blanket Purchase Agreements For Other Professional Services Of An Architectural Or Engineering Nature Or Service Incidental There To (including Studies, Investigations, Surveying And Mapping, Tests, Evaluations, Consultations, Comprehensive Planning, Program Management, Conceptual Designs, Plans And Specifications,value Engineering,constructionphase Services, Soils Engineering, Drawing Reviews, Preparation Of Operating And Maintenance Manuals And Other Related Services) That Logically Or Justifiably Require Performance By Registered Architects Or Engineers Or Their Employees. All Services Will Be Procured In Accordance With The Brooks A/e Act (public Law 92-582, As Implemented In Federal Acquisition Regulation (far) Part 36.6). All Capable Small Business Contractors Are Highly Encouraged To Respond To This Announcement, So That Nih Can Properly Evaluate Your Capabilities To Properly Develop Our Requirements. the Bpas Have An Estimated Composite Value Of $100m. The Applicable North American Industry Classification System (naics) Code Is 541330 (engineering Services) And The Small Business Size Is $25.5 Million. Nih Anticipates Awarding Multiple Contracts Under The Bpas For Future Other Professional Services Of An Architectural Or Engineering Nature. Services Will Be Procured In Accordance With The Brooks A/e Act (public Law 92-582, As Implemented In Federal Acquisition Regulation (far) Part 36.6). All Capable Business Contractors Are Highly Encouraged To Respond To This Announcement, So That Nih Can Properly Evaluate Your Capabilities To Properly Develop Our Requirements. background: As Part Of The U.s. Public Health Service Under The Department Of Health And Human Services, Nih Is The Federal Government's Primary Biomedical Research Agency. The Nih Office Of Research Facilities (orf) Is The Steward Of Nih Facilities And Is Responsible For The Planning, Design, Construction, Acquisition, Maintenance, And Operation Of Nih Owned Facilities, Which Includes: 1) Nih Main Campus, Bethesda, Maryland 2) Nih Animal Center, Poolesville, Maryland 3) Fort Detrick Campus, Frederick, Maryland 4) Research Triangle Park, North Carolina 5) Rocky Mountain Laboratories (rml), Hamilton, Montana 6) Epidemiology & Clinical Research Branch, Phoenix, Arizona 7) Bayview Campus, Baltimore, Maryland 8) Rental Facilities Maintained By Nih description Of The Requirement: The Nih Anticipates Awarding Multiple Aematoc Awards Under A Single Solicitation Utilizing A Task Order Mechanism. Each Idiq Will Be Awarded For A Five (5) Year Performance Period With A Cumulative Maximum Not-to-exceed Dollar Amount Of $400m. the Nih Also Anticipates Awarding Multiple Bpas Under A Single Solicitation Utilizing A Call Order Mechanism. Each Bpa Will Be Awarded For A Five (5) Year Performance Period With An Estimated Dollar Amount Of $100m. the Nih Seeks Highly Qualified Credentialed Contractors With Capability To Perform The Ae Matoc And/or Bpas, Which Will Include Various Simultaneous Task Orders And/or Calls. The Selected Contractors Shall Exhibit Demonstrated Experience, Capability And Resources Enabling Them To Provide Specialized A/e Services, Commissioning Support Services, Cqm Services, And Other A/e Related Services Critical To Orf’s Success In Planning, Alteration, Renovation, And New Construction Of Nih Facilities And Associated Infrastructure For Projects Of Similar Size And Complexity With Comparable Clients, And Most Significantly With A Proven Track Record Of Performing Such Projects With A High Degree Of Customer Satisfaction. contractors Responding To This Notice To Perform The Contract As Small Business Joint Venture Shall Use The Procedure Described At The Small Business Administration (sba) Web Site. The Sba Url Is: Https://www.sba.gov/federal-contracting/contracting-assistance-programs/joint-ventures. Responding Contractors Shall Have Current Information With The System For Award Management (sam), At Www.sam.gov, And Must Not Be Excluded From Government Contract Award At The Time Of Submission. projects May Include, But Are Not Limited To The Following Areas: animal Care Facilities – To Include, But Not Limited To, Facilities For Housing, Care, And Use Of Animals In Experimental Testing, Research, And Training As Related To Biomedical Research. Animals Used At Nih For Research Include But Are Not Limited To Mammals Of All Sizes, Including Primates, And Aquatic Animals. biomedical Research Laboratory / Laboratory Facilities – To Include, But Not Limited To, General And Specialized Biomedical And Animal Research Laboratories, Laboratory Support Spaces, Laser Laboratory, And Electron Microscopes. Projects Related To Lab Facilities In This Contract Will Include General And Bio-safety Levels (bsl) -2, -3, And -4. health Care Facilities Or Hospitals – To Include, But Not Limited To, Patient Care Units, Outpatient Clinics, Intensive Care Units, Surgical Suites With Catheterization Laboratory, Radiology, Nuclear Medicine, And Mri Suites, Pharmacy, Rehabilitation, Transfusion Medicine, Cyclotron, Radiation Oncology, Medical Gas Services, Pediatrics, And Hospital Support Services. office / Public Space Facilities – To Include, But Not Limited To, Offices, Sensitive Compartmented Information Facilities (scif), Training Facilities, Conference Facilities (including Natcher Conference Center), Libraries (including The National Library Of Medicine), Child Development Centers, Residences And Lodging, Commercial Shops And Food Services, Wellness Centers And Gyms, Recreational Facilities, Facilities For Ancillary Services Such As Fire And Police, Parking Structures, And Exterior Improvements Such As Roadways, Sidewalks, And Landscaping. interior And Exterior Utility Infrastructure And Utility Generation Distribution Systems - The A/e Services Include The Design Of Interior & Exterior Utility Infrastructure And Systems For Office / Public Facilities; Animal Care Facilities; Bio-medical Research Laboratories; Healthcare /hospital Facilities; And General-purpose Facilities Such As Parking Structures And Warehouses. The Utility Interior & Exterior Infrastructure And Generation & Distribution Systems Include, But Are Not Limited, To The Following: mechanical, Electrical, And Plumbing Systems. high Voltage Electrical central Utility Plant (cup) hvac Systems To Include Specialized Filtering Requirements, Supply And Exhaust Systems And Associated Controls. steam/condensate, High Temperature Hot Water, Heating Hot Water, Chilled Water, Lab Water, High Purity Water, And Potable Water Systems. compressed Air, Medical Gas, Lab Vacuum, And Material Gas Systems. central Co2 Systems. central Liquid Nitrogen Systems. fuel Oil Systems. storm Water And Sanitary Sewer Distribution Systems. wastewater Treatment Systems. electrical Substations. landscaping Irrigation Systems. commissioning commissioning, Qualification, And Validation (cqv) historical geotechnical elevator physical Security interior / Exterior Lighting telecommunications building Envelope roofing building Model Information (bim) net Zero Emissions this Idiq Shall Support Projects In Maryland, North Carolina, And The Montana Locations. maryland Facilities Include: nih Main Campus, Bethesda, Md nih Animal Center, Poolesville, Md fort Detrick Campus, Frederick, Md bayview Campus, Baltimore, Maryland rental / Leased Facilities Maintained By Nih it Is Anticipated That A Majority Of The Facilities Under This Idiq Will Be Located On The Nih Main Campus, Bethesda, Md, Followed By The Other Surrounding Areas. Therefore, The A/e Shall Maintain An Office Within Fifty (50) Miles Of The Baltimore - Washington, Dc Metropolitan Area For The Duration Of The Idiq Contract. research Triangle Park, North Carolina for Projects In North Carolina, The A/e Shall Plan To Maintain Local Presence Within Fifty (50) Miles Of The Nih Research Triangle Park Campus For The Duration Of The Project. rocky Mountain Laboratories (rml), Hamilton, Montana for Projects In Montana, The A/e Shall Plan To Maintain Local Presence Within One Hundred (100) Miles Of The Rocky Mountain Labs Campus For The Duration Of The Project. architect / Engineer Services the A/e Shall Furnish All Labor, Management, Investigations, Studies, Travel, Supplies, Equipment, And Materials To Perform The Required Services. The A/e Is Responsible For Determining What Disciplines And Skill Sets Are Required For Accomplishing The Work And Form A Team Accordingly. in General, Pre-design And Design Phase Services Will Include, But Not Limited To: field / Site Investigations, Inclusive Of Pre-tab Investigations planning And Coordination Drawings building Information Modeling (bim) (only If Applicable To The Task Order) sustainable Design program Of Requirements (pors) special Studies schematic Design design Development construction Documents (65%) construction Documents (95%) construction Documents (100%) rendered Perspectives Of Proposed Building Construction And Substantial Site Development construction Cost Estimate(s) construction Baseline Schedule geotechnical Investigations preparation Of Reports the A/e May Be Required To Provide Construction Phase And Other Services Including, But Not Limited To: construction Bidding And Negotiation Support construction Inspections / Site Representation construction Progress Meetings requests For Information (rfis) construction Submittal Reviews change Order Reviews / Support punch Lists inspection Of Stored Items construction Close-out Support Including As-builts; Record Documents; Non-compliance Notices; Operation And Maintenance (o&m) Manuals; Warranties; Product And Equipment Demonstrations And Training. a/e Record Documents commissioning Support Services commissioning Support Services (cx) Shall Perform, But Not Limited To, The Following Tasks: review Specifications And Drawings review Submittals develop Commissioning Scripts review O & M Manuals witness Testing Of Electrical And Mechanical Systems construction Quality Management (cqm) general Project Management - To Include, But Not Limited To, Provide Administration And Management Services To Assist The Contracting Officer’s Representative (cor) In The General Day-to-day Administration Of The Overall Project. project Governance preparation And Maintenance Of A Project Management Plan (pmp) assist In The Implementation Of The Project Governance Structure reviews And Document Management monthly Reports requests For Information (rfi) submittals financial Management budget/cost Control Monitoring And Management invoices / Application For Payment Review change Order Control Process And Management estimating Services scheduling Support – Regularly Review, Analyze, And Monitor The Dbb/dbcs Performance Schedule(s), Including, But Not Limited, To The Preliminary/baseline Schedule, Critical Path Method (cpm) Construction Schedules, And Fragnets, As Required. quality Construction Management, Reviews And Administration Assistance - Shall Include Inspections, Verifications, Details Audits And Evaluations Of Materials And Workmanship Necessary To Determine And Document The Quality Of Construction. The Cqm Contractor Shall Use Its Expertise And Knowledge Of Construction Practices, Means And Methods To Execute An Effective Quality Assurance Program. potential Sources Shall Complete And Submit The Attached Forms: sources Sought - Contractor Information Form 1.1 Complete The Sources Sought – Contractor Information Form if Applicable, Interested 8(a) Small Business Firms Shall State Their Current 8(a) Certification Data With The Small Business Administration if Applicable, Interested Hubzone Small Business Firms Responding Must Provide Proof Of Their Hubzone Certification Status. certificate Of Insurance 1.2 Interested Firms May Include A Capability Statement As An Attachment To The Sources Sought – Contractor Information Form. Capability Statement Shall Be No Longer Than Ten (10) Pages. Potential Sources’ Experience Shall Demonstrate And Document The Following The Capability Statement: naics Code(s) evidence Of The Ability To Work In Occupied Space. evidence Of The Ability To Work On Multiple Projects Simultaneously. evidence Of The Ability To Perform The Work Described In The Sources Sought – Project Data Form Section Below. self-performance Capability (contractor Shall Self-perform At Least 15% Of Each Task Order). building Information Modeling (bim) Capability. leed Capabilities. 2. Sources Sought – Project Data Form 2.1 Complete The Sources Sought – Project Data Form For No More Than Five (5) Example Projects Performed Within The Last Five (5) Years, Or In Progress, Which Best Demonstrates Your Firm’s Specialized Experience Providing A/e Services On Projects Of Similar Type, Size, And Complexity To The Nih Requirement, As Defined Below. Each Completed Sources Sought – Project Data Form Shall Not Exceed Three (3) Pages And Shall Contain At A Minimum The Following Types Of Project Experience: one (1) Utility Infrastructure / Utility Generation /distribution System Projects one (1) Biomedical Research Lab; And one (1) Healthcare / Hospital Project. [note - An Indefinite Delivery Indefinite Quantity (idiq) With Multiple Task Orders Is Not Considered A Project. Each Individual Task Order Executed Under An Idiq Contract Is Considered A Project.] 2.2 Project Experience Requirements: type - Specialization Category/facility Types Such As: interior & Exterior Utility Infrastructure And Utility Generation & Distribution Systems biomedical Research Laboratory Facilities health Care Facilities office/public Space Facilities animal Care Facilities 2. Complexity - Special Design/construction Considerations Such As: physical Security Requirements adjacencies To Occupied Space(s) Restrictions/ Limitations limited Access Restrictions vibration / Noise Limitations joint Commission (for Hospitals) Requirements (i.e. Special / Interim Life Safety Measures, Construction Risk Assessments) implementing Guiding Principles For Sustainable Federal Buildings And Leadership In Energy And Environmental Design (leed) Criteria special Mep Features - I.e. Designed For Infectious Or Immune Compromised Areas Within A Hospital Space. historic Preservation Requirements storm Water Management And Erosion & Sedimentation Control use Of Building Information Modeling (bim) net Zero Emission Requirements for All Patient Care Support Spaces: Compliance With The Facilities Guidelines Institute (fgi) For Healthcare Projects And Most Current Healthcare Facility “statement Of Conditions” (sco). nih Design Requirements Manual (drm) 3. Size - Contractors Shall Have The Experience, Capability, And Resources Necessary To Perform Simultaneous/concurrent Projects Of Varying Size (between $25,000 To $20,000,000) And Complexity, As Described Above. all Qualified Interested Firms Are Requested To Submit An Electronic Copy Of Their Completed Letter Of Interest, Qualification Statement, And Capability Statement (in One Combined Pdf Format), Via Email, To The Contracting Officers, Ms. Magan Miller At: Magan.miller@nih.gov And Ms. Ana Marie Pagulayan At: Anamarie.pagulayan@nih.gov. The Submission Shall Be Received On Or Before By 12:00 Noon, Est On Friday, January 24, 2025. The Email Subject Line Shall Read: Sources Sought 2025 Matoc Qualification Statement For Architect / Engineer Services. Inquiries Shall Be Submitted Via E-mail To Magan Miller At: Magan.miller@nih.gov And Ana Marie Pagulayan At: Anamarie.pagulayan@nih.gov. Electronic Mail Inquiries And Submissions Will Only Be Accepted.
Closing Date24 Jan 2025
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+1Building Construction
United States
Details: Synopsis: project Title: pre-solicitation Notice For Project 657-24-111jc Renovate Ambassador Suite & Main Lobby, Building 1, Saint Louis Va Medical Center John Cochran Division, Saint Louis, Mo. contract Information a. This A/e Services Requirement Is Being Procured In Accordance With The Brooks Act (public Law (pl0582) And Implemented In Accordance With The Federal Acquisition Regulation (far) Subpart 36. Firms Will Be Selected Based On Demonstrated Competence And Qualifications For The Required Work. b. This Procurement Is Restricted To Service-disabled Veteran Owned Small Business (sdvosb) Firms. This Requirement Is Being Procured In Accordance With The Vaar 836.606-73 As Implemented In Far Subpart 36.6. c. This Is Not A Request For Proposal, And An Award Will Not Be Made With This Announcement. This Announcement Is A Request For Sf 330 S From Qualified Contractors That Meet The Professional Requirements. d. The Selection Criteria For This Acquisition Will Be In Accordance With Far 36.602-1 And Vaar 836.602-1 And Are Listed Below In Descending Order Of Importance. The Completed Sf 330 Will Be Evaluated By The St. Louis Va Medical Center Evaluation Board In Accordance With Far 36.602-5(a) And The Selection Report Shall Serve As The Final Selection List, Which Will Be Provided Directly To The Contracting Officer. The Government Will Not Pay Nor Reimburse Any Costs Associated With Responding To This Request. The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. e. Award Of Any Resultant Contract Is Contingent Upon The Availability Of Funds. f. No Solicitation Document Is Available And No Other Information Pertaining To Project Scope, Etc. Is Available At This Time. Any Request For Assistance With Submission Or Other Procedural Matters Shall Be Submitted Via Email Only To Abby.monroe2@va.gov And Arnold.payne@va.gov. Personal Visits To Discuss This Announcement Will Not Be Allowed. g. The Naics Codes For This Procurement Is 541310 Architectural Services And Small Business Size Standard Of $12.5m. Award Of A Firm Fixed Price Contract Is Anticipated. The Anticipated Time For Completion Of Design Is Approximately 199 Calendar Days Including Time For Va Reviews. The Estimated Magnitude Of The Resulting Construction Price Range Is Estimated To Be Between $1,000,000 And $5,000,000. h. Database Registration Information: verification Of Status Of Apparently Successful Offeror This Acquisition Is 100% Set-aside For Qualified Service-disabled Veteran Owned Small Business Ae Firms Incompliance With Vaar 852.219-10. Only Businesses Verified And Listed In The Small Business Administration (sba) Registry Https://veterans.certify.sba.gov, Shall Be Considered. system For Award Management (sam): federal Acquisition Registrations Require That Federal Contractors Register In The System For Award Management (sam) Database At Www.sam.gov And Enter All Mandatory Information Into The System. Award Cannot Be Made Until The Contractor Has Registered. Offerors Are Encouraged To Ensure That They Are Registered In Sam Prior To Submitting Their Qualifications Package. j. The Excluded Parties List System (epls): to Ensure That The Individuals Providing Services Under The Contract Have Not Engaged In Fraud Or Abuse Regarding Sections 1128 And1128a Of The Social Security Act Regarding Federal Health Care Programs, The Contractor Is Required To Check The Excluded Parties List System (epls) Located At Www.sam.gov For Each Person Providing Services Under This Contract. Further The Contractor Is Required To Certify That All Persons Listed In The Qualifications Package Have Been Compared Against The Epls List And Are Not Listed. During The Performance Of This Contract The Contractor Is Prohibited From Using Any Individual Or Business Listed On The List Of Excluded Individuals/entities. k. E-verify System: companies Awarded A Contract With The Federal Government Shall Be Required To Enroll In E-verify Within 30 Days Of The Contract Award Date. They Shall Also Need To Begin Using The E-verify System To Confirm That All Of Their New Hires And Their Employees Directly Working On Federal Contracts Are Authorized To Legally Work In The United States. E-verify Is An Internet-based System That Allows An Employer, Using Information Reported On An Employee's Form I-9, To Determine The Eligibility Of That Employee To Work In The United States. There Is No Charge To Employers To Use E-verify. (far 52.222-54) l. A/e Firms Are Required To Respond If Interested By Submitting One (1) Completed Standard Form 330 Qualification Package Parts I And Ii To Include All Consultants (form Available On-line At: Https://www.gsa.gov/system/files/sf330-21.pdf). Must Include In Part I Section H An Organizational Chart Of The Firm (excludes Consultants) And A Design Quality Management Plan. Submission Information Incorporated By Reference Is Not Allowed. All Submissions Shall Be Made Electronically. m. Completed Package Shall Be Delivered Electronically On Or Before 1/17/2025 At 3:00pm Central Standard Time To The Nco 15 Contracting Office, Attn: Arnold Payne, Contracting Officer @ Arnold.payne@va.gov And Abby Monroe, Contract Specialist @ Abby.monroe2@va.gov. project Information the Mission Of The Veterans Affairs Saint Louis Health Care System (vastlhcs) Is To Provide The Highest Quality Health Care To Our Nation S Veterans. In Order To Accomplish This Mission, Vastlhcs Facility Engineering Service (fes) Intends To Partner With An A/e Firm On A Project To 657-24-111jc Renovate Ambassador Suite & Main Lobby, Building 1, John Cochran Division, St. Louis, Mo 63106. Project Will Renovate An Ambassador Entrance, Entrance Corridor, And The Ambassador Suite To Improve Patient And Ada Access To The Building, Fix Moisture And Leaking Issues With The Existing Skylight, Update Finishes, Improve Patient Circulation, And Optimize Space For The Existing Functions Operating In The Area As Well As Correct Hvac And Electrical Deficiencies, And Other Facilities Conditions Assessment Deficiencies Located Within The Area. The Main Entrance Of Bldg. 1 Will Be Updated To Facilitate Visitor Traffic Flow And Experience. The Existing Revolving Door Will Be Replaced With An Airlock Of Sliding And Swinging Doors With Automatic Controls. supplement B scope Of Work: a/e Services Are Required For Schematics, Design Development, Construction Documents, Construction Cost Estimate And Construction Period Services For Project Number 657-24-111jc Renovate Ambassador Suite & Main Lobby, Building 1. This Delivery Order Shall Cover The Following Tasks. a/e Part Two Services Of This Design Project (also Known As Construction Period Services) Includes Responding To Construction Contractor Requests For Information (rfis) During The Solicitation And Construction Phases Of The Construction Project, Attendance At Pre-bid, Post-award And Commissioning Kick Off Construction Project Conferences, Review Of Construction Material Submittals And Shop Drawings, Approximately 5 Site Visits During Construction To Ensure Compliance With The Design Drawings And Specifications, Preparation Of Site Visit Reports, Coordination With Project Commissioning Requirements, Review Of Any Construction Project Modifications For Cost And Technical Acceptability, Attendance In The Final Acceptance Inspection, Preparation Of The Punch List And Preparation Of Record Drawings Of The Completed Construction Project Based On The Construction Contractor S As-built Drawings. The A/e Shall Prepare A Submittal Log To Be Utilized By The Va During Construction Period Services, Maintain Rfi Log And Provide Meeting Minutes For Weekly Construction Meetings Throughout The Duration Of Construction. The A/e Shall Hire A Third-party Commissioning Agent To Commission All Installed Equipment. the Above Paragraphs Constitute A Basic Outline Of The Work To Be Accomplished And In No Way Comprises All The Details For Design Of This Project. The A/e Shall Initiate Detailed Inspection Of The Project Site To Determine The Needs And Conditions For The Design Of This Project. the A/e Shall Be Solely Responsible For The Management, Including All Associated Labor, Equipment, Materials, Mailing Costs, And Inspection, To Meet The Requirements Of The Design Project. The A/e Shall Further Provide Meeting Minutes For All Meetings Held Under This Design Project. general Statement a/e Part One Services (also Known As Design Phase) For This Design Project Includes Site Visit, Field Investigation, Conduct Of Studies And User Interviews To Update Drawings, Specifications And Cost Estimates For All Facets Of Work And Disciplines/trades To Facilitate A Construction Project. This Project Will Renovate Ambassador Suite & Main Lobby, Building 1 2. Design Development: the A/e Firm Shall: a. Meet With Facilities, And Other Personnel Prior To Start Of Design To Determine Detailed Requirements Of Work Involved. b. Work From Existing Building And Site Drawings Furnished By The Va To Develop Project Design. (these Are To Be Used Only As Guidelines); c. Perform Any Necessary On-site Field Investigations To Accomplish Work And To Verify Drawings Provided By The Va; d. Prepare Rough Sketches, If Necessary, To Solve Possible Problems In Design Throughout The Contract; And e. Follow Va Program Guide Pg-08-15 Volume C, And Other Applicable Guidelines To Design The Project. 3. Evaluation Factors: selection Criteria Are In Accordance With Federal Acquisition Regulation (far) Part 36.602-5 And Va Acquisition Regulation (vaar) Part 836.602-1.â  Prospective Firms Are Required To Address All Selection Criteria Within Submitted Sf330 Packages Using Additional Pages As Necessary.â  Sf 330 Submissions Including Any Additional Pages Are Not To Exceed Fifty (50) Pages. Each Page Cannot Exceed 81/2 X 11 In Size. qualifications (sf330) Submitted By Each Firm For Project Number: 657-24-111jc Renovate Ambassador Suite & Main Lobby, Building 1 Va Medical Center Saint Louis John Cochran Division Will Be Reviewed And Evaluated Based On The Following Evaluation Criteria Listed Below In Descending Order Of Importance: 1. Professional Qualifications: The Qualifications Of The Individuals Which Will Be Used For These Services Will Be Examined For Experience And Education And Their Record Of Working Together As A Team. A/e Firms Shall Have Licensed Professional Architects And Engineers Currently Registered In The State Of Missouri Or In A State Of Which Missouri Has Recognized The Engineering License. The Specific Disciplines Which Will Be Evaluated Are Architects, Civil Engineer, Mechanical Engineers, Electrical Engineers, Structural Engineers, Industrial Hygienists, Estimators, Cad Operators, Project Managers, Leed Consultant, Fire Protection Engineer, And Interior Designer. 2. Specialized Experience And Technical Competence: Provide Detailed Project Information On Any Projects (that Are Complete - Design And Construction) The Proposed Team Has Worked Together On In The Last Five (5) Years. Special Emphasis Will Be Given To Any Medical Facility Related Projects. If The Entire Team Has Not Worked Together Previously, Provide Detailed Project Information That Each Of The Team Members Have Worked On In The Last Three (3) Years With Special Emphasis On Medical Facility Projects. The Project Information Should Include Project Titles, A Short Scope Of Work, Date Of Design Completion, Date Of Construction Completion, Firms Involved, Etc. The A/e Shall Also Describe If They Have Any Experience Completing A Design That Was Started By Another A/e Firm. Provide The Project Title, Scope Of Work, Date Of Design Start For This Team, Percentage Of Design When Accepted By Team And Completion Of Design. 3. Capacity To Accomplish The Work. The General Workload And Staffing Capacity Of The Design Offices Which Will Be Responsible For The Majority Of The Design And The Ability To Accomplish The Work In The Required Time Will Be Evaluated. 4. Past Performance: Nco 15 Will Evaluate Past Performance On Recent And Relevant Contracts With Government Agencies (emphasis On Va Work) And Private Industry In Terms Of Construction Cost Estimating, Cost Control, Quality Of Work, Compliance With Performance Schedules And A Record Of Significant Claims Against The Firm Due To Improper Or Incomplete Engineering Services (references Required). Project Past Performances That Are Older Than 3 Years Will Receive A Lesser Score Than Those References For Projects Accomplished Within The Past 3 Years. 5. Location Of Design Firm: The Geographic Proximity Of Each Firm To The Location Of The Va Medical Center Will Be Evaluated. The Firm Must Be Capable Of Issuing Stamp Drawings In The State Where The Work Is Performed.â  The Medical Center Is Located At Saint Louis, Va Medical Center, Saint Louis Missouri 63106. 6. Claims And Terminations: Provide Documentation Of Significant Claims Against The Firm Or Terminated Contracts Because Of Improper Or Incomplete Architectural And Engineering Services. Provide A Detailed Narrative Of Relevant Projects Within The Last 5 Years That Have Claims Against The Organization Or Have Been Terminated By The Owner. Include The Circumstances, Cost, And Schedule Impacts To Involved Parties, And Outcomes Of The Claims And/or Terminations. They Will Be Examined.
Closing Date17 Jan 2025
Tender AmountRefer Documents 

NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY USA Tender

Civil And Construction...+2Consultancy Services, Civil And Architectural Services
United States
Details: Amendment 0001 - The Due Date For Qualifications Has Been Extended To Monday, January 13, 2025, 2:00pm Est. Government Responses To Rfi's Have Been Attached To This Notice. description: this Is A Request For Qualifications For Architect And Engineering (a&e) Services. This Request Is 100% Set-aside For Small Business’s Registered Under The Applicable Naics Code 541330 – Engineering Services, With A Size Standard Of $25,500,000. the National Institute Of Standards And Technology (nist), An Agency Of The U.s., Department Of Commerce, Intends To Award Multiple Indefinite Delivery Indefinite Quantity (idiq) Contract(s) For General Architectural And Engineering (a/e) Services For The Nist Gaithersburg Campus Located At 100 Bureau Drive, Gaithersburg, Md 20899. A/e Services Under The Contract May Include The Following: evaluation And Feasibility Studies To Include Engineering Modeling And Simulation demolition Of Nist Structures, Utilities, And Infrastructure repair And/or Repair By Replacement, Modification/reconfiguration, Building Additions, And Upgrades To Nist Facilities (e.g., Laboratories/scientific Research, Office, Industrial). Including But Not Limited To Architectural, Mechanical, Electrical, Communications, Structural, Fire Protection, And Building Enclosure (e.g., Roofs, Windows, Foundations). repair And/or Repair By Replacement, Modification/reconfiguration For Campus Utility Systems And Supporting Underground Structures comprehensive Historical Assessments For The Preservation, Rehabilitation, And Restoration Of Historic Property interior Design Services Consisting Of Programming And Space Assessment, Fit Plans, And Office Furniture To Enhance Aesthetics, Comfort, Efficiency, And Workplace Safety. cost Estimating For Different Levels (e.g., Concept, Detailed Program, Project) life Cycle Cost Analysis Identifying Cost Elements From Initial Concept Through Operations, Support, And Disposal. hazardous Material Survey And Risk Assessment (e.g., Asbestos, Mold, Lead Paint) roofing And Waterproofing Services Such As Visual Inspections And Existing Conditions Surveys, Failure Investigation, And Design For Repairs. commissioning Design Including Assistance Of Development Owner’s Project Requirements (opr), Design Document Reviews, Development Of Commissioning Specifications And Or Initial Commissioning Plan program Of Requirements (por) Development By Meeting With Campus Personnel And Confirming Design Intent For Building And/or Major Systems (e.g., Mechanical, Electrical, Plumbing, Structural, Controls, Security, Fire Alarm, Etc.) value Engineering Analysis To Achieve Design Goals While Lowering Life Cycle Costs And Maintaining The Required Performance, Quality, Reliability, And Maintainability. record Drawings Development From Compiled As-built Set. surveying (e.g., Alta/ascm, Boundary, Topographic, Construction, Site Planning) roads/sidewalks Repairs And Replacement evaluation Of Items Requiring Earthwork Such As Excavation, Grading, Ponds, Drainage, Foundation, And Footings landscaping Design gates, Fencing, And Related Engineering Necessary To Support A Campus Environment permit Applications Submission To Regulatory Authorities Based On Specific Project Requirements. To Be Coordinated With Cor And Or Ahj For Acceptance And Or Approval environmental Compliance (state Or Federal) Conforming To Laws, Regulations, Standards, And Other Requirements construction Quality Management To Include But Not Limited To Commissioning Services contract Information: the Period Of Performance Of The Idiq Contract(s) Shall Be Five (5) Years. Annual Fully Burdened Labor Rates Will Be Negotiated Prior To Award. All Services Will Be Ordered Via The Issuance Of Individually Negotiated Firm-fixed-price Or Not­to-exceed Task Orders, Ranging In Value From $10,000 And $2,000,000. Each Idiq Contract Shall Include A Guaranteed Minimum Order Of $5,000. The Cumulative Amount Of All Task Orders Shall Not Exceed $9,800,000. the Government Anticipates Award Of Three (3) Or More Idiq Contracts; However, The Actual Number Of Awards Shall Be Made At The Discretion Of The Government. submission Requirements: consideration Will Be Limited To Professional A/e Firms Licensed And Registered In Maryland Who Provide A/e Services Primarily In The Disciplines Of Architectural, Civil, Structural, Mechanical, Electrical, And Environmental Engineering For Pre-design, Design, And Post-design Of Research Laboratory Facilities. firms Meeting The Above Requirements And Desiring Consideration Must Submit Their Qualifications By No Later Than The Date Specified In This Announcement Via Email To The Following Addresses Using The Email Subject Line “rfq Submission – General Ae Services Idiq Nb195000-25-00009”: Trent.stevens@nist.gov Guzel.gufranova@nist.gov Teresa.harris@nist.gov qualification Submissions Shall Include One (1) Original Electronic Copy In Adobe .pdf Format Of Their Standard Form 330 (sf-330) With Appropriate Data. Ae Firms Shall Include All Subcontractor's Resumes In Part 1 Of The Sf-330. Part 2 Of The Sf-330, General Qualifications, Should Also Be Submitted For Each Subcontractor Or Consultant. Indicate The Solicitation Number On All Documentation Submitted. along With The Sf-330, Offerors Shall Include: a Copy Of Your Current Registration In System For Award Management (sam); proof Of Small Business Status; a Cover Page That Provides: offeror’s Name And Address; offeror’s Uei Number; And, the Name, Title, Email, And Phone Number For The Authorized Representative Of The Offeror. submissions Will Be Evaluated By A Source Selection Evaluation Board (sseb) And Ranked Based On The Stated Evaluation Factors. The Government Will Then Establish A Competitive Range; Firms That Fall Within This Range Will Be Invited To Present Their Capabilities To The Sseb. Formal Solicitations Requesting Fee Proposals Will Be Issued To The Highest Qualified Firms As Determined By The Government. request For Information (rfi) questions And Rfi's Must Be Submitted No Later Than 1:00pm Et On 12/10/2024 Via Email To The Following Addresses Using The Subject Line “rfi - General Ae Services Idiq Nb195000-25-00009” : Trent.stevens@nist.gov Guzel.gufranova@nist.gov. the Contracting Officer Will Post Government Responses To Rfi’s On This Site As An Amendment To This Announcement. Firms Are Responsible For Monitoring This Site For Amendments To The Request For Qualifications. selection Criteria: all Work Performed Shall Be Under The Direct Control And Supervision Of A Professional And Experience Licensed Architect/engineer Employed By The Prime Contractor Assigned As The Responsible Party. part I: Evaluation Of Sf-330 prospective A-e Firms Will Be Evaluated Based On Their Demonstrated Competence And Qualifications For The Type Of Professional Services Required. The Agency Will Evaluate Each Potential A-e Firm In Terms Of This Announcement. The Selection Criteria Are Listed Below In Descending Order Of Importance: factor 1: Specialized Experience page Limit – 15 Pages firms Who Fail To Meet The Qualifications Of Factor 1 Will Not Be Evaluated On Subsequent Evaluation Factors And Will Not Be Considered For Award. offeror Shall Demonstrate The Specialized Experience And Technical Competence Of Its Firm And Its Proposed Subcontractors Performing A/e Services Meeting The Criteria Of This Solicitation Within The Past Sixty (60) Months By Providing At Least 3 But No More Than 5 Example Projects (sections F, G, And H Of The Sf330) Addressing Each Of The Subfactors Listed Below (1a, 1b, 1c, And 1d). Offeror Shall Provide At Least One Example For Subfactor 1d. All Designs Shall Be Completed At Time Of Request For Qualifications (rfq). For The Purposes Of This Evaluations, “completed” Projects Shall Mean Projects Where Final Work Was Submitted, Approved, And Accepted By The Project Owner. A. The Offeror Shall Describe Design For Renovations With Dates That Include Commercial Window Replacements, Masonry Repairs, And Roofing Repairs. Roofing Designs Are For Replacement Of An Existing Roofing System And Would Include Design And Specifications For New Built-up Roofs (at Least Three Ply) Of At Least 20,000 Sf Minimum, Including Drains, Coping And Flashing. Built Up Roofing Can Either Be Hot Or Cold Applied. B. The Offeror Shall Also Describe With Dates Laboratory Design For Renovations Of At Least 2,000 Sf Which Include Replacement Or New Fume Hood Installation Of A Fume Hood At Least Four Feet In Width, New Laboratory Grade Casework, New Seamless Flooring, And Plumbing That Includes Either Eye Wash Station Or Safety Showers. Laboratories Shall Be For Commercial Facilities, Federal And State Facilities, Hospitals, And College/universities. High School And Lower School Grade Laboratories Will Not Be Considered. C. The Offeror Shall Describe With Dates Designs That Include Laboratory Facility Mechanical, Plumbing, And Electrical Renovations, Upgrades And Alterations That Include Major Utility Systems, Facility Construction And Reconfiguration, Branch Circuits Of At Least 50 Amperes At 208v Or 480v, 3 Phase Power For Installation Of Specialized Scientific Tools, Equipment And Instrumentation (provide Amperage, Phases, And Voltages In Offer). The Contractor Shall Describe Distribution Of Manifold Specialty Gasses Utilizing At Least One Of The Following (nitrogen, Helium, Compressed Air, Or A Custom Blend) Within The Lab (note Which Gas Was In Manifold). D. The Offeror Shall Describe, With Dates, Life Safety And Code Compliance Of The Following: Ibc And Nfpa Analyses, Access And Egress Analyses, Fire Alarm Systems And Device Designs, Nfpa 13 Fire Suppression System Modification Calculations And New Installations, And Hazardous Detection Systems (radiological Or Toxic Gas Monitoring Systems). Note Which Detection System (radiological Or Toxic Gas Monitoring System) Is Being Referenced. factor 2: Professional Qualifications page Limit – 17 Pages the Offeror Shall Demonstrate The Technical Expertise And Professional Qualifications Of Its Proposed Team, Including Subcontractors And Consultants, To Perform The Required A/e Services By Providing Résumés (section E Of The Sf330) For All Of The Following Disciplines: principle senior Architect senior Cost Estimator senior Civil Engineer senior Electrical Engineer senior Fire Protection Engineer senior Geo-technical Engineer senior Laboratory Planner mechanical Engineer (piping) senior Mechanical Engineer (piping) senior Mechanical Engineer (hvac) senior Environmental Engineer senior Scheduler senior Surveyor senior Water Proofing Engineer senior Structural Engineer 2. Senior Positions Of Each Discipline Shall Have A Minimum Of Ten (10) Years Applicable Experience And Shall Be Licensed And/or Certified In Their Applicable Discipline. 3. The Offeror Shall Identify The Roles Of Its Key Personnel By Provide Resumes/sf 330s For Its Proposed Key Personnel That Include Credentials, Education, Registrations, Relevant Experience, And Their Role In Performing Requirements Outlined In Factor 1. 4. The Offeror Shall Submit An Organizational Chart Showing The Interrelations Of The Proposed Team Including All Subcontractors And Consultants. factor 3: Geographical Location page Limit – 1 offeror Shall Be Within 50 Miles Of The Nist Main Campus In Gaithersburg, Md. Nist Address Is 100 Bureau Drive, Gaithersburg, Md 20899. Offeror Shall Demonstrate This Distance By Submitting Information (driving) Via An Internet Mapping Program. The Driving Shall Begin At The Offeror’s Office To Nist. factor 4: Capacity page Limit – 2 Pages the Offeror Shall Describe Their Team, Including Subcontractors, Capability To Complete Simultaneous Tasks Within The Required Timeframe Based On Current And Planned Workload And Expected Backlog. the Offeror Shall Confirm That There Is Sufficient Capacity Within The Firm, Or That Additional Professional Capacity Can Be Increased As Needed In A Timely Manner To Deliver Projects That Meet The Government’s Specialized Requirements. factor 5: Past Performance page Limit – None offeror Shall Provide Past Performance Information For The Relevant Projects Identified In Their Factor 1 – Specialized Experience Submission In The Form Of Either A Contractor Performance Assessment Reporting System (cpars) Report Or The Provided Past Performance Questionnaires (ppqs). if The Project Was Completed For The Federal Government, The Offeror Shall Provide A Copy Of The Most Recently Completed Contractor Performance Assessment Reporting System (cpars) Report. if No Cpars Is Available, Offeror Shall Use The Provided Past Performance Questionnaire (ppq). Ppqs Shall Be Completed And Signed By The Customer Identified In The Relevant Project. Limit Of One Ppq Per Project. if An Offeror Submits Incomplete Past Performance Or Fails To Submit Any Past Performance Information, The Government May Evaluate Past Performance Based On The Information Obtained Concerning The Offerors’ Performance Relevant To Services Similar In Scope, Complexity, And Size For The Prime Contractor. Additionally, The Following Resources Will Be Used For Evaluation: contractor Performance Assessment Reporting Systems (cpars), Or Similar Systems Of Other Government Departments And Agencies, interviews Within Nist If Offeror Holds/held Previous Contracts, interviews With Program Managers And Contracting Officers, And; other Sources Known To The Government, Including Commercial Sources. in The Case Of An Offeror Without A Cpars Record Of Relevant Past Performance Or For Whom Information On Past Performance Is Not Available, The Offeror Shall Be Rated Neither Favorably Nor Unfavorably. part Ii: Oral Presentations in Accordance With Far 36.602-3, The Government Will Hold Discussions With At Least Three Of The Most Highly Qualified Firms (firms Within The Competitive Range). More Details Related To The Presentations Will Be Provide To The Firms That Are Selected To Move Forward. fee Proposal only Those Firms Selected For Award Will Be Invited To Provide A Fee Proposal. Firms Shall Submit Along With Their Fee Proposal A Copy Of Audited Overhead Rate Statement Prepared In Accordance With The Federal Acquisition Regulation (far), Part 31 For The Prime And Their Sub-consultants. The Audit Must Be From A Federal, State, Local Government Or An Independent Third-party Auditor In Accordance With Far 31. Audit Conducted In Accordance With Generally Accepted Accounting Principles (gaap) Will Not Be Accepted.
Closing Date13 Jan 2025
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+2Others, Building Construction
United States
Details: Presolicitation Notice This Is A Pre-solicitation Notice, This Not A Request For Proposals. This Is A Request For Sf-330 Architect/engineer Qualification Packages Only. All Information Needed To Submit Sf330 Documents Is Contained Herein. No Solicitation Packages Or Technical Information Will Be Issued In This Phase. Site Visits Will Not Be Arranged During This Phase. Architect/engineering (a/e) Design Services Project: 521-25-104 | Remove Abandoned Equipment From Sub-basement And Mechanical Rooms Project Location: Birmingham Va Medical Center, 700 19th Street South, Birmingham, Al., 35233 Period Of Performance: 160 Days. Estimated Magnitude Of Construction: Between $1,000,000 And $2,000,000. Naics: 541330 Engineering Services. Size Standard: $25.5 Million. Set-aside: 100% Service-disabled Veteran Owned Small Business (sdvosb). The Department Of Veteran Affairs Network 7 Contracting Office Is Seeking Qualified Architect-engineering (ae) Firms To Submit Standard Form 330 (sf 330) Architect/engineering Statement Of Qualifications For Project # 521-25-104 | Remove Abandoned Equipment From Sub-basement And Mechanical Rooms | Birmingham Va Medical Center Facilities In Network 7 (state Of Alabama). Firms Submitting Qualification Packages Must Be Fully Licensed To Perform Designs As A Registered Professional Ae Firm In The United States To Be Considered For This Opportunity. Also, See Geographic Location Restriction In Paragraph 5 Of This Notice. Network Contracting Office (nco) 7 Va Facility Locations Include: Birmingham Va Medical Center, 700 19th Street South, Birmingham, Al., 35233. This Acquisition Is 100% Set-aside For Small Disabled Veteran-owned Small Business (sdvosb). Prospective Contractors Are Cautioned That Proposal Submitted In Response To This Solicitation Must Meet The Criteria Identified By 38cfr, Part 74. The Sdvosb Concern Agrees That In The Performance Of The Contract, The Concern Will Comply With The Limitation On Subcontracting Requirements In Accordance With Vaar Clause 852-219-73 (jan 2023) (deviation), Va Notice Of Total Set-aside For Verified Service-disabled Veteran-owned Small Businesses. For A Service-disabled Veteran Owned Small Business (sdvosb) To Be Considered As A Prospective Contractor, The Firm, Including Joint Ventures, Must Be Verified And Registered In The Vetcert (veterans.certify.sba.gov) And Registered In The System For Award Management (sam) Database (www.sam.gov) At Time Of Submission Of Their Qualification And Reporting To Vets - 4212 Federal Contractor Reporting In Accordance With Far 52.222-37, Employment Reports On Veterans At The Following Website: Dol.gov/agencies/vets/programs/vets4212. Failure Of A Prospective Sdvosb To Be Verified By The Veteran Small Business Certification At The Time The Sf 330 Is Submitted Shall Result In Elimination From Consideration. All Joint Ventures Must Be Cve Verified At Time Of Submission And Submit Agreements That Comply With 13 Cfr 125.15 Prior To Contract Award. Contract Overview A Firm Fixed Price A/e Design Service Contract Is Contemplated For Project 521-25-104 | Remove Abandoned Equipment From Sub-basement And Mechanical Rooms. The Estimated Magnitude Of Construction For This Project Is Between $1,000,000 And $2,000,000. The Estimated/target Design Completion Period Is 160 Calendar Days After Issuance Of Notice To Proceed. The Naics Code For This Acquisition Is 541330, Engineering Services With A Size Standard Of $25.5 Million. Project Scope: The A/e Team, Including Architects, Engineers, Surveyors, And Professional Consultants Shall Provide Complete Design Services For The Development Of Specifications And Drawings For Project 521-25-104 Remove Abandoned Equipment From Sub-basement And Mechanical Rooms. This Project Is To Remove Abandoned Pieces Of Equipment Such As Heat Exchangers, Air Dryers, Pumps, Etc. And All Associated Piping From Sub-basement And Mechanical Rooms Throughout The Facility. This Project Will Additionally Remove Abandoned Electrical Feeders And Concrete Pads. Work May Include, But Is Not Limited To, Architectural, Electrical, Hvac, Fire Protection And Plumbing. Systems Impacted May Include Fire Alarm, Security Access Systems, And Med Gas. Due To The Requirement For Site Visits And Coordination On Design Reviews, A/e Firms Will Be Required To Attend Various Meetings In Person On Site At Birmingham, Al Vamc Facilities. Due To This Requirement, The Area For Consideration For This Acquisition Is Restricted To A/e Firms With An Operating Office Located Within 400 Miles Of Birmingham Va Medical Center, 700 19th Street South, Birmingham, Al., 35233. Eligible Prime Contractor Firms Must Have A Main And/or Branch Office Geographically Located Within The 400-mile Driving Distance. Determination Of Mileage Eligibility Will Be Based On Upon Www.google.com/maps. Selection Criteria. The A/e Source Selection Team Shall Utilize The Following Selection Criteria Listed In Descending Order Of Importance. Professional: Professional Qualifications Necessary For Satisfactory Performance Of Required Service And Working Together As A Team (in-house And/or Consultants(s)). Note: The Firm And A/e On Staff Representing The Project Or Signing Drawings In Each Discipline Must Be Registered/licensed To Practice In The United States Provide Your Information On The Sf 330 Clearly Marked By Providing A Current Architect And/or Engineering License Numbers And Proof Of Licensure. The Va Will Confirm The Individuals Are Current And In Good Standing With The Respective State Licensing Board.â Specialized: Specialized Experience And Technical Competence In The Type Of Work Required, Including But Not Limited To: Architecture, Electrical, Plumbing, Mechanical, Fire Protection, Abatement/industrial Hygiene, Cost Estimation, Project Management And Where Appropriate, Experience In Energy Conservation, Pollution Prevention, Waste Reduction, And The Use Of Recovered Materials. Include Government And Private Experience On Similar Projects. Capacity: Capacity To Accomplish Work In The Required Time. This Factor Evaluates Firm's Experience With Similar Size Projects And The Available Capacity Of Key Disciplines When Evaluating The Capacity Of A Firm To Perform The Work In The Required Time. The General Workload And Staffing Capacity Of The Design Office Will Be Evaluated. List Current Projects With Similar Design Fee Being Designed In The Firms Office. Indicate The Firms Present Workload And The Availability Of The Project Team (including Sub-consultants) For The Specified Contract Performance Period; Describe Experience In Successfully Delivering Projects Per Performance Schedule, Providing Timely Construction Support, And Successfully Completing Multiple Projects With Similar Delivery Dates. Past Performance: Cpars Data Or Past Performance Questionnaires Must Be Provided For Projects Submitted Under Factor 2 (specialized Experience). Failure To Provide Requested Data, Accessible Points Of Contact Or Valid Phone Numbers Could Result In A Firm Being Considered Less Qualified. Past Performance As It Relates To Cost Control, Quality Of Work, And Compliance With Performance Schedules. The Following Information Is Required For All Projects: Contract/task Order Number, Project Title, Prime Firm, Start Date, And Completion Date. Evaluations May Also Include Additional Performance Related From The Firm, Customer Inquiries, Government Databases, Publicly Available Sources, And Additional Projects In Cpars. Past Performance Will Be Evaluated On Recent And Relevant Contracts With Government Agencies Or Private Industry. Recent Is Defined As Performance Occurring Within 5 Years Of The Date Of This Notice, Except That Ongoing Projects Must Have Begun No Less Than One (1) Year Prior To The Issuance Of This Notice. Relevancy Is Defined As Performance Of Work On Projects That Are Similar In Scope To The Types Of Projects Anticipated Under The Resultant Contracts. Respondents With No Previous Past Performance Shall State This When Addressing The Selection Criteria. Where There Is No Record Of Past Performance, The Proposal Will Be Evaluated Neither Favorably Nor Unfavorably. Location: Knowledge Of The Locality, To Include Specific Knowledge Of Certain Local Conditions Or Project Site Features, Such As Geological Features, Climatic Conditions, Local Construction Methods, Construction Firms And Trades Labor Availability, And Local Laws And Regulations. That Your Proximity To The General Geographical Area Enables You To Respond To Emergency Calls In Person Within 24 Hours If Required. (sf 330 Submittal Should Show Your Knowledge Of The Locality Of The Project.) Eligible Prime Contractor Firms Must Have A Main And/or Branch Office Geographically Located Within The 400-mile Radius. Distance Will Be Determined By Google Maps. Commitment: The Extent To Which Potential Contractors Identify And Commit To The Use Of Service-disabled Veteran-owned Small Businesses, Veteran-owned Small Businesses, And Other Types Of Small Businesses As Subcontractors. Construction Period Services: Experience In Construction Period Services To Include Professional Field Inspections During The Construction Period, Review Of Construction Submittals, Support In Answering Requests For Information During The Construction Period, And Support Of Construction Contract Changes To Include Drafting Statements Of Work, And Cost Estimates. Reputation: Standing/reputation Of The Firm And Its Principal Officials With Respect To Professional Performance, General Management, And Cooperativeness. Mention Applicable Awards, Outstanding Merits, And Recommendations. Additional Experience: Specific Experience And Qualifications Of Personnel Proposed For Assignment To The Project. Selection Procedures. This Requirement Is Being Procured In Accordance With The Brooks Act Of 1972, Federal Acquisition Regulation 36.6 (far) And Va Acquisition Regulation 836.6 (vaar) And Va Acquisition Manual (vaam) 836.6. Firms Responding To This Announcement By Submitting A Qualifying Sf 330, Before The Closing Date And Time, Will Be Considered For Initial Selection Evaluation. Following Initial Evaluation Of The Sf330s Received Three Or More Firms That Are Considered The Most Highly Qualified To Provide The Type Of Services Required Will Be Selected For Interviews. Selected Firms Will Be Notified By Telephone Or Email Of Selection And Provided Further Instructions. Selection And Evaluation Of Firms Shall Be Made Based On Sf 330 Submissions And Direct Responses To The Selection Criteria Identified Herein. Failure To Address All Selection Criteria Will Result In A Decreased Rating. Evaluating Past Performance And Experience May Include Information Provided By The Firm, Customer Inquiries, Government Databases, And Contracting Officer Knowledge Of Current Project Performance. Failure To Provide Requested Data, Could Result In A Firm Being Removed From Consideration. If Relevant Cpars Evaluation(s) Are Available, Report(s) Shall Be Submitted With The Completed Sf330 Package. If There Is Not A Completed Cpars Evaluation, The Ppq Included With This Notice Is Provided For The Offeror Or Its Team Members To Submit For Each Project Included In Criterion (2). Official Cpars Evaluation(s) Found In In Government Databases Will Take Precedence. Completed Ppqs Should Be Submitted With Your Sf330. Firms That Design Or Prepare Specifications In Conjunction With This Contract Are Prohibited From Participating On Any Future Construction Contracts Based On Those Documents. All Projects Identified On The Sf330 Must Be Completed By The Office/branch/individual Team Member Performing The Work Under This Contract. Submission Requirements. The Sf 330 Form May Be Downloaded From Http://www.gsa.gov/portal/forms/type/sf. Completed Sf 330 S Shall Include The Primary Firms, Subcontractor Firms And Any Consultants Expected To Be Used On The Project. Do Not Submit Information Incorporating By Reference. Prospective Firms Shall Address All Selection Criteria Factors Within Their Submitted Sf330 Packages. The Following Format Should Be Used: Cover Page With Solicitation Number, Project Title. Table Of Contents. Sf 330. Acceptability Under Other Appropriate Evaluation Criteria, I.e., Sf 330, Section H. Copy Of Current A/e State Engineer/architect License. Unique Entity Id (uei). Tax Id Number. The E Mail Address And Phone Number Of The Primary Point Of Contact. Sf 330 Date Of Receipt/due Date: Interested Firms Having The Capabilities To Perform This Work Must Submit One (1) Electronic Sf 330 And Attachments (as Applicable) No Later Than 01/21/2025 At 1:00 P.m. Et. Email Capacity Is Limited To Ten (10) Megabytes (mbps). All Sf330 Submittals And Questions Must Be Sent Electronically To The Attention Of Contracting Officer Gregory Snyder, Gregory.snyder@va.gov. Please Also Copy Ryan.crispin@va.gov And Joseph.osborn@va.gov In Emailed Sf 330 Package. Please Include The Pre-solicitation Number, Project Title, And Firm Name In Subject Line Of Email. When Submitting Sf330s, If More Than One Email Is Sent, Please Number Emails In Subjects As 1 Of __ . Submittals Received After The Date And Time Identified On Page One (1) Will Not Be Considered. Firms Not Providing The Required Information May Be Negatively Evaluated. Facsimile Submittals Will Not Be Accepted. All Information Must Be Included In The Sf330. The Sf-330 Including Title Page, Table Of Contents, And Any Other Relevant Information Shall Not Exceed A Total Of 50 Pages In A Common Font Size 12 Font, Single Spaced. The Proposal Shall Be Submitted As A Single Application-generated (not Scanned), Searchable Pdf Document. A Page Is Defined As Each Face Of An 8.5 X 11-inch Sheet Of Paper Containing Information. The Page Limitation Does Not Apply To The Licenses, Contract Performance Evaluations, (i.e., Cpars) And Award Documentation. This Information Should Be Provided As Attachments To The Sf 330. All Questions Regarding This Announcement Must Be Emailed To The Contracting Officer Gregory.snyder@va.gov No Later Than 01/14/2025 By 1:00 P.m. Et. Site Visits Will Not Be Arranged During This Phase. This Announcement Is Not A Request For Proposal. This Is A Pre-solicitation Notice For Architect/engineering (a/e) Design Services; No Solicitation Package Will Be Issued Until After An Evaluation Has Been Made On The Provided Sf-330. Only The A/e Firms Responding To This Announcement By Submitting An Sf330 Package On Time Will Be Considered For Initial Evaluation.
Closing Date21 Jan 2025
Tender AmountRefer Documents 
391-400 of 405 archived Tenders