Hvac Tenders

Hvac Tenders

Offizielle Bezeichnung Land Hessen, Vertreten Durch Den Landesbetrieb Bau Und Immobilien Hessen, Zentrale Vergabe Tender

Software and IT Solutions
Germany
Description: Public tender Vob/a building automation (DIN 18 386); 6 automation focal points for the control and regulation of system automation and room automation with approx. 420 physical and approx. 510 communicative data points. ... Multi-building automation (DIN 18 386); 6 automation focal points for the control and regulation of system automation and room automation with approx. 420 physical and approx. 510 communicative data points. Furthermore, 3 RLT systems with their own control are to be connected to the MBE via Bacnet/IP. A BSK bus system is planned for the approx. 45 fire dampers. Key service items for building and system automation: Common I/Os in the respective ASP with master-slave (redundant automation station): Lecture hall building: ASP07: Heating/sanitary trades, BSK bus system, 2 fields ASP08: Control of air conditioning systems, cooling, room automation House 1-4 (existing buildings): 1 ASP each for heating, hot water preparation The room automation includes the control of the HVAC systems such as underfloor heating, reheaters/coolers, volume flow controllers, but not blinds, lighting, etc. For automation management, an MBE is planned as a tower workstation as an operating station including printer as a complete system. The electrical cable installations are carried out by the electrical contractor, here the coordination services and the final cabling are to be carried out.
Closing Date17 Jan 2025
Tender AmountRefer Documents 

Philippine Orthopedic Center - POC Tender

Electrical Goods and Equipments...+1Electrical and Electronics
Corrigendum : Closing Date Modified
Philippines
Details: Description 1 Lot Supply, Delivery And Installation Of Air-conditioning Unit 1 Unit 2.5 Hp Split Type Dual Inverter Compressor Deluxe Aircon Wall Mounted Hvac Type : C/o Cooling Power Consumption Rated/min (w):1150/270 Thinq (wifi): Yes Cooling 4way: Up-down/left-right Air Flow Direction Control (left & Right): Yes Air Flow Direction Control (up & Down): Yes Fan Speed: 6 Steps Air Purifying: Air Purifying Display: Yes Ionizer: Yes (diffusion Charger) Pm 1.0 Sensor: Yes Convenience Auto Restart: Yes Fan Mode: Yes Forced Switch Operation: Yes On/off Reservation (24hr): Yes Remote Controller: Yes Reservation: Yes Smart Diagnosis: Yes Thinq (wifi): Yes Energy Saving Active Energy Control: Yes Energy Monitoring: Yes Kw Manager: Yes Design Color (body): White Color (discharge): Black Display: 88 Hidden Filter Fine Dust Filter: N/a Pre Filter: Yes Hygiene Auto Cleaning: Yes Uv Nano: Yes Outdoor Unit Outdoor Unit Model Name:hsu18apx2 General Cooling Power Consumption Rated/min (w): 1550/270 Hvac Type: C/o Indoor Unit Dimension_wxhxd(mm): 1020x385x210 Indoor Unit Weight (kg):12.0 Outdoor Unit Dimension_wxhxd(mm): 870x650x330 Rated: Input Voltage (v,hz): 230,60 Refrigerant Type:r32 Cooling Capacity Max (btu/h): 20700 Cooling Capacity Rated (hp): 2.0 Cooling Capacity Rated/min (btu/h): 18000/3500 Dehumidification Dehumidification:yes
Closing Date7 Jan 2025
Tender AmountPHP 190 K (USD 3.2 K)

Sefton Council Tender

Software and IT Solutions
United Kingdom
Details: Sefton Council Operates 6 Leisure Centres, Both Wet And Dry Facilities, Plus The Atkinson Centre In Southport, Home For Music, Theatre, Art, Literature, And History. Sefton Mbc Invites Tenders For The Renewal Of Our Maintenance Support Contract For The Building And Energy Management System (bms) Installed At All The Above-named Sites, Due In February 2025, Using The Platform Iqvision Software To Enhance Our Building Management System (bms). The Objective Is To Improve Energy Efficiency, System Integration, And Overall Building Management. We Require An Experienced Service Partner For The Maintenance, Regulation, And Monitoring Of All Mechanical And Electrical Equipment (hvac) To Allow The Facilities To Operate Efficiently To Control The Buildings Energy Usage Whilst Achieving Optimum Environmental Conditions And Reduced Energy Costs, Using The Software Trend Iqvision. The Current Bms Server Utilised For Iqvision Is Hosted Within The Smbc On-premises Data Centre.
Closing Date17 Jan 2025
Tender AmountRefer Documents 

U S SPECIAL OPERATIONS COMMAND USSOCOM USA Tender

Education And Training Services
United States
Details: The Naval Special Warfare Command (nsw) Group 1 Is Requesting Information To Identify Sources Capable Of Providing Skills Trade Course Of Instructions (coi) Trades Certifications For Carpentry, Hvac, Electrical, Plumbing, Welding, And Small Engine Utilizing Industries Tools And Equipment. this Is A Request For Information (rfi) Notice With The Overall Objective Of Conducting Market Research In Support Of Preliminary Planning For The Potential Acquisition Of Skills Trade Course Of Instructions (coi) Trades Certifications For Carpentry, Hvac, Electrical, Plumbing, Welding, And Small Engine Utilizing Industries Tools And Equipment. This Rfi Seeks To Provide Industry And Interested Parties With Information That Will Assist In The Understanding Of Current Technical Requirements For Potential Skills Trade Course Of Instructions (coi) Trades Certifications For Carpentry, Hvac, Electrical, Plumbing, Welding, And Small Engine Utilizing Industries Tools And Equipment. See Attached Document For Additional Information And Submission Instructions. respondents To This Rfi Must Adhere To The Following Details: submissions Shall Be Double Spaced, Typed Or Printed In Times New Roman Font With Type No Smaller Than 12-point Font. submissions Shall Not Exceed Ten (10) Pages. Course Descriptions, Class Schedules, Facilities, Etc. any Text Contained Within Tables, Graphs, Etc. Should Be 8-point Times New Roman Font Or Larger. included Files Should Be Created/prepared Using Microsoft Office 2010 Compatible Applications. Graphics, Photographs, And Other Data That May Not Be Compatible With Microsoft Office 2010 Should Be Submitted In Portable Document Format (pdf) Format. submitted Electronic Files Should Be Limited To The Following Extensions: .docx Microsoft Word .xlsx Microsoft Excel .pptx Microsoft Powerpoint .pdf Adobe Acrobat this Rfi Is Issued For Informational And Planning Purposes Only And Is Not To Be Construed As A Commitment By The Government To Issue A Solicitation Or To Award A Contract. In Accordance With Far 15.201(e), Responses To This Notice Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract. As Such, The Government Will Not Reimburse Any Costs Associated With Responding To This Notice. Any Organization Responding To This Notice Should Ensure That Its Response Is Complete And Sufficiently Detailed To Allow The Government To Determine The Organization's Qualifications To Meet The Requirement. Any Information Submitted By Respondents Is Strictly Voluntary. Respondents Should Properly Mark Its Responses With The Appropriate Restrictive Markings. Information That Is Proprietary Or Competition-sensitive May Be Protected From Disclosure Under The Public Records Law Only If Properly Labeled As Such. The Government May Choose Not To Respond To Specific Questions Or Comments Submitted In Response To This Rfi Notice Or Information Provided As A Result Of This Rfi. Respondents Will Not Be Notified Of The Results Of This Notice. The Information Obtained From Submitted Responses May Be Used In The Development Of An Acquisition Strategy And Future Solicitation. If A Solicitation Is Issued, It Will Be Announced Separately On Sam.gov And All Interested Parties Must Respond To That Solicitation Separately From The Response To This Rfi. Submission Of A Response To This Notice Does Not Constitute A Request To Be Added To A Bidders List Or To Receive A Copy Of A Solicitation. submissions Shall Be Submitted Electronically To Emily.lonigro@socom.mil. Email Is The Only Acceptable Method Of Submission. No Facsimile Quotes Will Be Accepted. Submission Through The Sam System Is Not Permitted.
Closing Date8 Jan 2025
Tender AmountRefer Documents 

Staatliches Hochbauamt Freiburg Tender

Services
Civil And Construction...+1Civil Works Others
Germany
Details: Title: Wezembeek-oppem / Belgique, Sécurisation Et Rénovation D’un Bâtiment Résidentiel, Techniques Spéciales Et Peb description: Rénovation D’un Bâtiment Résidentiel À Wezembeek-oppem / Belgique Commande De La Mission De Techniques Spéciales (hvac Et Electricité) Et Peb Dans Les Domaines De La Planification Et De L’exécution. La Procédure D’adjudication Doit Permettre De Mandater Un Bureau D’études Adéquat Disposant Des Compétences Suivantes : Disponibilité (mandat En Mars 2025), Expérience En Projets De Rénovation Et D’extension, Expérience Dans L’intégration Des Énergies Renouvelables Integrant La Géothermie Et De L’augmentation De L’efficacité Énergétique Dans La Conception Et La Mise En Œuvre. Langue Du Projet : Français. Dépôt De Peb: Région De Flandre
Closing Date20 Jan 2025
Tender AmountEUR 220 K (USD 226.7 K)

Pennsylvania Game Commission Tender

Civil And Construction...+1Civil Works Others
United States
Details: This Project Is A Standard Low Bid ... This Project Is A Standard Low Bid Project And Includes General Hvac Plumbing And Electrical Construction Project Title Pa Game Commission New Pymatuning Wildlife Learning Center Estimated Range 1 General 5 000 000 6 000 000 2 Hvac 900 000 1 000 000 3 Plumbing 200 000 300 000 4 Electrical 400 000 500 000 Liquidated Damages 1 3 000 00 Per Day 2 500 00 Per Day 3 500 00 Per Day 4 500 00 Per Day There Is No Bid Guaranty Required For This Project Date For Receiving Bids Is Wednesday January 15 2025 At 1 00 P M The Pre Bid Conference Will Take Place On Thursday December 19 2024 At 10 30 A M At Pgc Pymatuning Wildlife Mgt Center 9552 Hartstown Road Hartstown Pa 16131 Client Agency Requirements Information About The Non Mandatory Pre Bid Conference Facility And Its Location May Be Obtained From Mr Kieffer In Accordance With Pa Procurement Guidance He Will Not Respond To Bidders Requests For Information Rfis Rfis During The Bid Stage Shall Be Submitted By The Bidder Via Trimble Unity Construct Formerly E Builder Under The Q A Tab In The Package S Invitation To Bid Responses To Bidder Inquiries Will Be Addressed In Writing Via Addendum So All Bidders Have The Same Information The Department Of General Services Capital Programs And The Bureau Of Diversity Inclusion And Small Business Opportunities Bdisbo Identified This Procurement As Eligible For The Setting Of Small Diverse Business Sdb And Or Veteran Business Enterprise Vbe Participation Goals However Bdisbo Did Not Set Sdb And Or Vbe Participation Goals For Those Procurements That Are Less Than The 600 000 Threshold Required To Set Either Goal In Addition There Will Be No Points Allocated Toward Sdb Sb Participation For This Procurement This Is A Significant Programmatic Change From The Sdb And Sb Participation Program Contained In Prior Projects Issued By Capital Program...
Closing Date15 Jan 2025
Tender AmountRefer Documents 

FEDERAL EMERGENCY MANAGEMENT AGENCY USA Tender

Civil And Construction...+2Others, Civil Works Others
Corrigendum : Closing Date Modified
United States
Details: Update 8: Additional Questions And Answers Provided. 1. Does The Government Want All Ceiling Tiles Removed Not Partial Removal? all Ceiling Tiles Need To Be Replaced 2. It’s Estimated That 50-60% Of The Ceiling Tile Grid Needs To Be Replaced, Should We Just Remove 100%? presently Only The Bent And Damaged Grids Are Listed To Be Replaced In The Sow. 3. Will The Hard Deck, Exterior Duct Work, Need To Be Cleaned Or Hepa Vacuumed? Not In Protocol. cannot Answer As Fema Personnel Are Not Subject Matter Experts On Mold Remediation And Do Not Know What All Needs To Be Done To Remove The Mold. 4. Once The Ceiling Tiles Are Removed And Visible Mold Contamination Is Found Around The Registers And Diffusers, Will That Constitute For A Change Order To Remove The Insulation Above And Treat Such Areas? cannot Answer/unsure 5. Will The Carpet Need To Be Steamed Cleaned Since It’s A Porous Material? cannot Answer As Fema Does Not Have The Expertise. update 7: Additional Question And Answer Provided. what Is The Timeframe That The Mold Consultant (industrial Hygienist) Recommends For Leaving The Air Filtration Devices In Scrub Mode Prior To Conducting Clearance Sampling?this Information Is Crucial For Determining The Number Of Days The Hepa Air Filtration Devices And Other Related Equipment Will Need To Remain On-site. the Air Filtration Devices (scrubbers) Need To Be In Place From The Start Of The Project Until Clearance Is Obtained. update 6: Additional Question And Answer Provided. question: Is The Hvac Subcontractor Expected To Replace Any Components Of The Hvac System That Do Not Work Properly Such As The Evaporator Coils, Drain Pans, The Return And Supply Plenums As Well As The Ductwork (if Cant Be Cleaned) And Does This Need To Be Included In The Quote, Or Will The Replacement Of Parts Be A Change Order? no, Contractor Is Not Expected To Replace Major Hvac Components. The Hvac Duct Cleaning As Was Specified By The Company That Did The Mold Testing: “if Ductwork Is Uncleanable, The Remediation Contractor Shall Poly Off Both Ends And Discard As Necessary” update 5:additional Questions And Answers Provided. original Question: Any Pictures Of The Affectedareas? frf Is Designated As A Temporary Secure Work Area (tswa) & No Pics Are Allowed. follow-up Question: How Were The Pictures Acquired On The Brighton Solutions Documents Attached On Sam.gov? Can Other Photos Of The Ceiling And Other Areas Not Be Acquired? those Items (shoes / Chair) Were Temporarily Pushed Outside The Frf And Pics Taken Outside The Frf. 2. Original Question: Is There Any Affected Insulation Material Above The Grid? It Is Often Overlooked And Usually Has To Be Replaced Once The Ceiling Tiles Are Relaced, The Sow Makes No Mention Of This. If We Find It Damaged And In Need Of Replacement,will This Be A Bilateral Agreement Added Later On? maintenance Techs Inspected And Stated That The Insulation Does Not Rest On The Ceiling Tiles. The Insulation Is Suspended Above The Tiles By Wire Mesh. follow-up Question: So The Insulation Is Not Part Of The Remediation? As Stated In Section 1.3? no. (i Am Told By Maintenance Personnel That The Insulation Is Suspended By Wire Above The Ceiling Tiles). 3. Original Question: Sow Mentioned Damaged Framework Above Grid Needs To Be Repaired.are There Any Pictures Of The Damaged Areas? frf Is Designated As A Temporary Secure Work Area (tswa) & No Pics Are Allowed. follow-up Question: Same As #1 no Picture Taking Is Allowed Inside The Frf Room. 4. Original Question: At Which Point Will A Decision To Be Made Of Repair Or Total Replacement Of The Grid If It Needs To Be Replaced In Its Entirety? the Replacement Of All Ceiling Tiles And All Metal Framing Is Stated On The Sow As A Requirement. follow-up Question: The Sow Only Reference Grid Straightening Not Replacement. the Sow Was Updated To Indicate That Al Ceiling Tiles And Supporting Metal Framing Is Required To Be Replaced. 6. Original Question: Is There A Mold Remediation Protocol As Completed By A Licensed Tdlr Mac? Can That Be Provided? unfortunately, We Do Have The Experience Nor Have An Sme On Site To Answer Those Questions. follow-up Question: The Brighton Solutions, If They Are A Tdlr Mac, Then They Would Be The Company To Create The Remediation Protocol. the Sow Sated That Vendor Must Sub Contract That Out Separately. 8. Original Question: Will The 3rd Party Clearance Be The Original Mac Or Will The Remediation Contractor Be Required To Coordinate That Effort? it Is Our Understanding That Contractor Needs To Acquire Clearance Thru And Independent And Certified Vendor. follow-up Question: If There Is Already A Consultant (brighton Solutions) Then They Would Be The Company To Perform The Clearance. This Is Not A Function Of The Remediation Company Under Tdlr Mold Rules. we Fema Do Not Have The Expertise To Answer This. 9. Original Question: The Sow Calls For The Cleaning Of It Equipment; Are Those Units Running And Will They Remain Running During The Remediation? yes,one It Rack Will Be Running. follow-up Question: This Will Have To Be Wrapped According To The Protocol And Will Possibly Cause A Problem Of Heat Could Be An Issue. it Is My Understanding That The It Rack Hasn't Be Cleaned Also. Once Cleaned, Fema Has Two Options To Mitigate The Heating Issue; 1 Is To Relocate The It Rack Outside The Frf Room. 10. Original Question: What Was The Identified Underlying Cause Of The Fungal Growth? Has This Been Addressed Or Will That Be On The Contractor? hvac Leak And Not Cooling Caused Excessive Moisture Buildup.ac Leak To Be Repaired By Separate Contractor. follow-up Question: Hvac Duct Cleaning Cannot Be Completed During A Mold Remediation Per Tdlr Regulation. the Sow States If This Is Needed, Is The Contractor’s Responsibility To Ensure This Gets Done. update 4: Additional Questions And Answers Provided. additional Questions And Answers: 1. Any Pictures Of The Affectedareas? frf Is Designated As A Temporary Secure Work Area (tswa) & No Pics Are Allowed. 2.is There Any Affected Insulation Material Above The Grid? It Is Often Overlooked And Usually Has To Be Replaced Once The Ceiling Tiles Are Relaced, The Sow Makes No Mention Of This. If We Find It Damaged And In Need Of Replacement, Will This Be A Bilateral Agreement Added Later On? maintenance Techs Inspected And Stated That The Insluation Does Not Rest On The Ceiling Tiles. The Insulation Is Suspended Above The Tiles By Wire Mesh. 3.sow Mentioned Damaged Framework Above Grid Needs To Be Repaired. Are There Any Pictures Of The Damaged Areas? frf Is Designated As A Temporary Secure Work Area (tswa) & No Pics Are Allowed. 4.at Which Point Will A Decision Be Made Of Repair Or Total Replacement Of The Grid If It Needs To Be Replaced In Its Entirety? the Replacement Of All Ceiling Tiles And All Metal Framing Is Stated On The Sow As A Requirement. 5.there Are Stages At Which The Remediated Area Will Need To Be Put Back Into Service, Once Clearance Is Achieved. 1.1 Replacement Of Hvac Duct Work If It Is Found Uncleanable (this Will Be Skipped If Ductwork Is Cleaned) 1.2 Bent Framework Needs To Be Corrected 1.3 Insulation Needs To Be Replaced 1.4 Tiles Will Need To Be Replaced And Any Fitting Of Tiles Will Be Done At This Time. 1.5 Final Cleaning And Turnover To Client. The Question Will Be, Is The Awarded Vendor Responsible For The Purchasing Of Ceiling Tiles And Insulation, And Subcontracting The Hvac Contractor If The Ductwork Is Uncleanable? yes. 6.is There A Mold Remediation Protocol As Completed By A Licensed Tdlr Mac? Can That Be Provided? unfortunately, We Do Have The Experience Nor Have An Sme On Site To Answer Those Questions. 7.this Is A Tdlr Notifiable Project. That Must Be Completed And Filed Will It Be A Routine Or Emergency Project? unfortunately, We Do Have The Experience Nor Have An Sme On Site To Answer Those Questions. 8. Will The 3rd Party Clearance Be The Original Mac Or Will The Remediation Contractor Be Required To Coordinate That Effort? it Is Our Understanding That Contractor Needs To Acquire Clearance Thru And Independent And Certified Vendor. 9.the Sow Calls For The Cleaning Of It Equipment; Are Those Units Running And Will They Remain Running During The Remediation? yes, One It Rack Will Be Running. 10.what Was The Identified Underlying Cause Of The Fungal Growth? Has This Been Addressed Or Will That Be On The Contractor? hvac Leak And Not Cooling Caused Excessive Moisture Buildup. Ac Leak To Be Repaired By Separate Contractor. 11.the Sow 2.0a States “service Area(s) – Vsab 1 Frf Approximate Amount Of Impacted Material - Shoes And Leather Chair, And Less Than 25 Sf Of Contiguous Visible Mold Growth” Was This Determined By A Tdlr Mac? yes, Brighton Solutions. 12.was There A Previous Project For This Requirement Or Is This A New Requirement? We Would Like To Know If This Is A Brand New Contract Or If There Is (was) An Incumbent Performing These Services. If Not Brand New, Could You Please Provide The Current / Previous Contract Number? no Previos Project. New Contract. 13.is There A Wage Determination? wage Determination For The Denton Area Is Attached To This Solicitation. 14.can You Please Provide The Specifications Of The Ceiling Tiles? fifth Avenue 280; 2 Ft X 4 Ft X 5/8 Inch; Commercial Equivalent, Fissured 562. 15.could You Kindly Confirm Which Section Or Specifications Detail The Protocol For This Project? Your Guidance Will Be Greatly Appreciated To Ensure My Understanding Aligns With The Requirements. the Sow Lists This. update 3: Poc Email For Site Visit Has Been Updated As Incorrect Email Was Provided Previously And Two Attachments Have Been Added Which Are The Two Reports Received From Brighton Solutions Regarding Theinitial Mold Assessment Report Of What They Discovered In The Frf Room. update 2: Submission Deadline Extended To January 14, 2025 By 5:00 Pm Et. update 1: Questions And Answers And Wage Determination Attached. questions And Answers: what Is The Square Footage Of The Frf Room Requiring Remediation? Frf Room Measures Approx 50’ X 50’, So 2,500 Sq Ft. are There Any Known Water Sources/leaks That Need To Be Addressed As Part Of The Remediation? No Known Sources what Type Of Mold Has Been Identified Through Testing, If Any? I Believe It Was Black Mold, (this Should Be In The Sow) are There Any Special Security Clearance Requirements For Personnel? Yes, Every Employee Will Have To Have Pass An Ncic (national Crime Information Center) Check what Are The Working Hours Allowed For Remediation Work? 7am To 4pm (m-f) is There A Required Timeline For Completion After Award? The Sow Provides The Period Of Performance are There Any Containment Requirements For Adjacent Spaces? No, However From The Contracting Officer's Representative Who Is A Non-sme, In Reading The Requirements From The Testing Company, Two Other Adjacent Areas At Least Need To Be Air-scrubbed. This Is Listed In The Sow. what Is The Current Hvac System Configuration In The Affected Area? The Frf Has Its Own 15 Ton Conventional Ac Unit. It Is Dedicated Solely To The Frf Room. are There Any Sensitive Equipment Or Materials That Need Special Protection During Remediation? Yes, There Is Some Rf Radio Equipment Racks And One It Equipment Rack. is There A Designated Staging Area For Equipment And Materials? Yes. the Awardee Will Provide All Necessary Labor And Materials To Perform The Work Required To Eradicate All Mold In The Frf Room. 1) Please See The Attached Statement Of Work For Requirements. 2) The Evaluation Criteria Is Shown In The Request For Proposal Attached To This Solicitation. The Offeror Must Address The Specifics Of The Evaluation Factors To Be Considered For Award. 3) Please Email The Contracting Officer Listed In The Request For Proposal With Any Questions You May Have. site Visits Will Be Offered On January 8th, 2025 From 9:30am-2:00pm Cst. Please Contact David Perez At David.perez3@fema.dhs.gov To Schedule. Proposals Are Due January 14th, 2025 By 5:00 Pm/et.
Closing Date14 Jan 2025
Tender AmountRefer Documents 

NBCC India Limited - NBCC Tender

Works
Civil And Construction...+8Electrical Generators And Transformers, Building Construction, Security and Emergency Services, Consultancy Services, Water Storage And Supply, Electrical Works, Electrical and Electronics, Civil And Architectural Services
Eprocure
Corrigendum : Closing Date Modified
India
Details: Operation And Maintenance Works Of Dream Valley Phase 2 Project, Tech Zone Iv, Greater Noida (u.p) operation & Maintenance Of Civil , E & M Services (internal & External), Housekeeping, Security Services, horticulture/landscaping Works, Stp, Wtp, Rwh, swimming Pool, Fire Fighting & Fire Alarm, Substation, dg Set, Lifts, Hvac/mechanical Ventilation System, water Supply Pumps, Cctv System, Solar Power system, General Pest Control, Wtp,stp, Rwh, Building management System With Cctv Camera, Access control System, Boom Barrier System , Data Centre & allied Infrastructures , Along With Amc Of Mep equipments As Mentioned In Tender Documents At amrapali Dream Valley Phase-ii Project Which comprises Of Multistoried Residential Towers Containing 1 Bhk, 2 Bhk & 3 Bhk Dwelling Units And Nonresidential Buildings Containing Commercial, Social And services Infrastructures. There Are 47 Nos. Towers having 8302 Apartments In This Phase-ii With configuration Of 2b+p+g+18 & 2b+p+g+25 respectively With Elevators, Services And Three-layer basement/stilt For Parking.
Closing Date6 Jan 2025
Tender AmountINR 139.6 Million (USD 1.6 Million)

DEPT OF THE AIR FORCE USA Tender

Civil And Construction...+1Others
United States
Details: The Sources Sought Notice Is Posted By The Government Agency Seeking Possible Sources For A Project. This Notice Is Not A Solicitation For Work Or A Request For Proposal. The Purpose Of This Notice Is To Identify Interested And Capable Vendors To Perform The Work Described Below And To Incorporate The Results Of This Notice Into The Government's Market Research Report. this Statement Of Work (sow) Describes The Government’s Requirement For The Design To Replace The Hangar Doors At Buildings 1340 And 1362 At Eielson Air Force Base (afb), Ak. The Hangar Door At Building 1340 Is Currently Inoperable. A Survey Was Conducted To Assess Whether Repairs Without Redesign Were Feasible, But It Concluded That Repair Was Out Of Scope. Therefore, This Project Is To Develop A Design And Conduct A Cost-benefit Analysis To Determine The Best Hangar Door Type And The Manufacturer Offering The Lowest Maintenance Cost Over The Lifespan Of The New Door. additionally, Eielson Afb Is Experiencing Higher Than Normal Maintenance Costs And Labor Hours For All 32 Vertical Fabric Doors Manufactured By International Door Company In Building 1362, Compared To Nearby Facilities Using A Different Manufacturer. This Project Shall Develop The Design And Cost Estimate To Convert These Doors To Systems Manufactured By Megadoor. building 1362: The A-e Shall Provide 100% Design Documents For The Converting From The Current Door System To A Megadoor Vlf. The Design Shall Include: • Installation Of Exterior Generator Hookups And Required Interior Electrical Upgrades To Ensure The Facility Can Be Powered Via Generator During Outages. • Design Of A Catwalk System Within The Facilities’ Mechanical Room, Allowing Access To The Hvac System, Which Currently Lacks Accessible Pathways. building 1340: The A-e Shall Provide Two 35% Design Coas For The Inoperable Hangar Door; One As A Tip Up Door Using A Single Counterweight System And The Other As An External Sliding Door. Based On The Selected Option, The A-e Shall Deliver 100% Design Documents. The Design Shall Include: • Installation Of 10 Feet Of Glycol Heat Tracing In Front Of The Hangar Doors Extending To The Apron. • Any Necessary Electrical Or Hvac Upgrades To Accommodate The New Door System. • Site Investigations, Including Two Borings, To Assess Soil Profiles And Environmental Contaminants Required For The Civil/structural Design And Glycol Work. respond To This Notice By Emailing The Contract Administrator Kimberly Graham At Kimberly.graham.3@us.af.mil And The Contracting Officer Sra Christopher Prince Atchristopher.prince.3@us.af.mil Stating Your Firm's Interest Inaccomplishing This Effort.
Closing Date9 Jan 2025
Tender AmountRefer Documents 

Soci T Wallonne De Financement Compl Mentaire Des Infrastructures Tender

Works
Civil And Construction...+2Others, Civil Works Others
Belgium
Details: Title: Marché De Travaux Ayant Pour Objet La Réhabilitation Complète D’un Immeuble De Bureaux Situé Rue Du Canal De L’ourthe, 9/3 À 4031 Angleur description: Les Bureaux De La Sofico Se Situent Actuellement Dans Un Bâtiment Situé Rue Du Canal De L’ourthe, 9, Bte 3 À B-4031 Angleur. Ce Bâtiment, Érigé Dans Les Années 1990, Ne Répond Plus Aux Normes Et Standards Actuels (incendie, Électricité, Isolation, Chauffage, Bien-être Des Travailleurs, Etc.). Le Présent Marché De Travaux Vise La Réhabilitation Complète De Ce Bâtiment. Les Travaux À Réaliser Sont Essentiellement Les Suivants : - Travaux De Démolition Et De Curage Du Bâtiment Existant En Vue De Sa Réhabilitation ; - Gros Œuvre Et Parachèvement En Vue De La Réhabilitation Du Bâtiment ; - Travaux De Menuiseries Extérieures ; - Installation D’équipements De Techniques Spéciales (hvac Et Électricité) ; - Aménagement Des Abords Et Des Places De Stationnement. Les Travaux Décrits Ci-dessus Ne Sont Pas Exhaustifs. Le Détail Des Travaux Est Repris Dans Les Clauses Techniques Et Le Métré Récapitulatif.
Closing Date10 Jan 2025
Tender AmountEUR 6.7 Million (USD 7 Million)
371-380 of 435 archived Tenders