Housekeeping Tenders

Housekeeping Tenders

Rizal Medical Center Tender

Housekeeping Services
Philippines
Details: Description Bids And Awards Committee Request For Quotation Rfq No. 2025-001 The Rizal Medical Center (rizal Med) Through Its Bids And Awards Committee (bac), Hereby Invites All Interested Suppliers Or Distributors Registered With The Philippine Government Electronic Procurement System (philgeps), To Submit Their Quotation On The Project Listed Below, Subject To The General Conditions Stated Herein, And Submit Not Later Than January 20, 2025. Name Of Project: Procurement Of One (1) Lot Pest Control Services For Cy 2025 Mode Of Procurement: Negotiated Procurement Sec. 53.9 – Small Value Procurement Approved Budget For The Contract: Two Hundred Twenty Eight Thousand Pesos (php228,000.00) Terms Of Reference Pest Control Services 2025 I. Objective To Provide Pest Control Services To Rizal Medical Center For The Cy 2025 Ii. Approved Budget For The Contract The Approved Budget For The Contract Is Two Hundred Twenty-eight Thousand Pesos (php228,000.00). Iii. Scope Of Work The Service Provider Shall Provide The Following Pest Control Services For A Period Of One Year (12 Months) To Rizal Med Premises: I. Crawling And Flying Insect Control Frequency • Thermal Fogging Monthly • Misting Monthly • Residual Spraying Monthly • Trapping/baiting As Needed • Spraying And Misting Of Surrounding Quarterly Ii. Rodent Control • Baiting As Needed • Trapping As Needed Iii. Termite Control • Soil Poisoning Once A Year • Residual Spraying Quarterly • Chemical Dusting Quarterly • Termites Mound Examination/ Demolition Quarterly Iv.animal Control • Controlling According To Local Regulations Of Cats, Dogs, Etc. As Needed • Technical And Professional Services The Service Provider Shall Provide The Following Technical Methods And Professional Services For The Effective Pest Control Program Of Rizal Med Premises: A. For Crawling And Flying Insects Control  Thermal Fogging – It Is An Aerial Surface Disinfection Method Which Provides Access To Hard-to-reach Areas And Simultaneously Disinfects Walls And The Atmosphere. It Is An Effective Smoke Odor Removal Procedure Because It Recreates The Fire Related Properties Of Heat And Pressurization.  Misting – Use Of Misting Machines Inside The Offices Which Disperse Minute Droplets Of Insecticide Solution In An Aerosol Range To Attain Minimum Penetration Of Hard To Reach Or Inaccessible Area To Control Mosquitoes And Other Flying Insect O Use Of Foaming/chalk And Gel Bait Inside The Ward And Other Specialty Wards (or, Er, Ob-er, Dr, Rr, Icu, Picu, Nicu, Imcu And Cancer Wards), Will Be In Accordance With The Specification Of Its Toxicologist And Enterologist, Chemicals Used Should Be Approved By The Food And Drug Authority (fda).  Residual Spraying – This Shall Be Done To Facilitate Direct Extermination Of Insects In Places And Areas Where Insects Congregate, Crawl And Hide, Including Cracks And Crevices. It Will Be Applied To Areas Where Fogging Treatment Is Not Available.  Trapping/baiting – Use Of Cage Traps, Glue Board, Snap And Other Mechanical Devices To Augment The Baiting Technique, Installation Of Bait Stations In Hidden Places And Strategic Location Where Crawling Insects Usually Search For Food, Roam Around And Congregate. B. For Rodent Control Regular Treatment By Bait Laying Of Anticoagulant Preparations In Areas Used As Passageway And Harborages Of Rats And Mice, Based On A System Of Permanent/semi-permanent Bait Stations. These Rodenticides Provide Good Control Without Presenting Any Hazard To Products Or Personnel. However, If The Degree Of Infestations Should Ever Warrant It, Acute Bait/chronic Rodenticides Will Be Used, But Only After Close Consultation With Rizal Med And Under The Strict Supervision Of The Engineering And Facilities Management Section. Supplementary Control Methods Such As Mechanical Traps And Sticky Boards, Plugging Or Sealing Off Of Holes That May Serve As Entry Points Will Also Be Employed If The Situation So Warrants. C. For Termite Control 1. Soil Poisoning This Service Shall Be The Application Of Termiticidal Chemicals Along The Perimeter Of Rizal Med. The Service Provider Shall Create A Continuous Chemical Barrier Making It Impossible For Termite To Enter And Destroy The Wooden Structures Of The Buildings Through The Following: A. Drilling Holes 30 Centimeters Apart At The Concrete Perimeter Fence Of The Compound Using An Electric Rotto Hammer Drill, Then Injecting Termiticidal Chemicals, Using A Modern Pressurized Soil Rudder Injector. B. Direct Injection Of Termiticidal Chemicals Along The Concrete And/or Soil Perimeter Of The Building Of The Compound 30 Centimeters Apart Using The Same Procedure And Equipment In 1(a). C. Drilled Holes After Treatment Shall Be Restored To Its Original Appearance Through The Use Of Concrete Mix/cement. 2. Residual Spraying This Shall Be Done To Facilitate Direct Extermination Of Termites On Infested Parts Of The Building. Uninfected Areas Shall Also Be Treated To Provide Adequate Protection. 3. Chemical Dusting The Service Refers To The Application Of Anti-termite Powder To All Joints, Ends, Crevices, Baseboards And Cabinets. Emphasis Of Treatment Shall Be On The Wooden Structures Of The Building. 4. Termites Mound Extermination All Termites’ Mounds Found Within The Rizal Med Building Compound Shall Be Excavated And Exterminate The Queen And Workers Since These Are Infesting The Wooden Structures Of The Building. Terms And Conditions 1. The Service Provider Shall Warrant That The Services To Be Rendered Will Effectively Exterminate All Pests, Insects And Rodents Without The Visible Presence And Disturbing Odor Of Smoke And Fumes. Should Rizal Med Find The Services To Be Ineffective As Evidenced By The Continuous Presence Of Termites, Cockroaches, Mice And Other Common House Pests And Insects, Rizal Med Reserves The Right To Terminate The Contract. In Such Case, The Rizal Med Shall Not Be Obliged To Pay The Service Provider For The Services Rendered. 2. The Service Provider Shall Warrant That All Preparations And Formulations, Including The Use Thereof, Will Be In Accordance With The Specification Of Its Toxicologist And Enterologist, Pyrethroid Insecticides That Are Biodegradable In Nature And Only Chemicals Certified By The Proper Government Authorities As Safe Shall Be Used. 3. The Service Provider Shall Render Pest Control Treatment To The Nutrition And Dietetics Department Twice A Month. 4. The Service Provider Shall Agree That Only Honed, Skilled And Well-trained With Training Certificates Personnel/technicians Will Be Assigned To The Rizal Med Premises To Ensure The Proper Treatment And Application Of Chemicals. 5. The Service Provider Shall Assign A Sufficient Work Force With Proper Personal Protective Equipment (ppe) And Sufficient To Carry Out Or Implement The Service. Assigned Staff Shall Wear Proper Uniform And Identification Card While Within The Rizal Med Premises. 6. The Service Provider Shall Agree That The Required Services Shall Be Conducted From 4:00 Pm – Onwards And Weekends, As May Be Determined By The Rizal Med, In Order Not To Disrupt The Working Schedule Of Rizal Med Personnel. 7. The Service Provider Shall Provide On-call Service In Between Schedule Without Additional Cost To Rizal Med, Including Performing Immediate Special Or Additional Service Should There Be A Sudden Outbreak Of Infestation At The Rizal Medical Center Premises At No Cost To Rizal Med. 8. A Quality Control Supervisor Affiliated With The Service Provider Shall Visit The Rizal Med Premises Quarterly Or Whatever Necessary To Undertake The Following: A. Coordination With Rizal Med Authorized Representative In Evaluating The Effectiveness Of The Pest Control Treatment. B. Serve As Pest Control Consultant By Recommending Ways And Means To Control Infestation. C. Provide Orientation On The Pest Control Management, Handling And Application Of Chemicals To Concerned Rizal Med Personnel. 9. A Penalty Of One-tenth Of 1% (.001) Of The Total Value Of The Undelivered Goods/services Shall Be Charged As Liquidated Damage For Every Day Of Delay Of The Delivery Of The Service. A. Payment Shall Be Done Within Sixty (60) Days Upon Receipt Of The Statement Of Account/billing Invoice, With Complete Supplementary Documents On A Monthly Basis. 10. The Service Provider Must Submit An Accurate Monthly Assessment Report. 11. The Service Provider Shall Cover The Following Areas: Administrative Building 1 Office Of The Medical Center Chief And Board Room 2 Office Of The Chief Of Medical Professional Staff 3 Professional Education, Training, And Research Unit 4 Office Of The Chief Administrative Officer (hopss) 5 Office Of The Chief Administrative Officer (finance) 6 Ent Office (former Chief Training Office) 7 Office Of The Chief Nurse 8 Heart Station 9 Integrated Management Information System Section 10 Quality Improvement, Infection Prevention Control, And Patient Safety Unit 11 Blood Bank 12 Cash Operations Section 13 Billing And Claims Section 14 Admitting And Information Section 15 Security Unit (in-house) Dormitory Building (old) 1 Dormitory 2 Budget Section 3 Accounting Section 4 Coa Auditor’s Office 5 Legal Unit 6 Wound Care Center Office 7 Public Health Unit 8 Planning & Management Unit 9 Hrm/ Psb – Shrpsb Office Other Areas 1 Nutrition And Dietetics Department (weekly) 2 Engineering And Facilities Management Section 3 Powerhouse 4 Housekeeping, Linen & Laundry 5 Materials Management Section 6 Tb Dots 7 New Dormitory 8 Solid And Infectious Waste Storage / All Public Comfort Rooms 9 Chapel 10 Central Supply And Sterilization 11 Health Information Management Department 12 New Er Extension 13 Human Resource Management Section 14 Procurement Section 15 Medical Social Work Department 16 Udds Office 17 Other New Office And Establishments Out Patient Department Complex First Floor 1 Department Of Otorhinolaryngology Head And Neck Surgery 2 Surgery Clinic 3 Opd Central Registration Section 4 Minor Or 5 Opd Laboratory & Drug Testing 6 Pharmacy & Consignment 7 Department Of Radiology And Imaging Science 8 Department Of Physical Medicine And Rehabilitation 9 Pharmacy Department 10 Stone Center Second Floor 1 Social Service (opd & Pasig City Constituents) 2 Dental Department 3 Opd Head 4 Health & Wellness Clinic 5 Cashier 6 Mental Hygiene 7 Pediatric Clinic 8 Medicine Clinic 9 Opd Registration 10 Department Of Obstetrics And Gynecology/ Ultrasound 11 Employees Health Service 12 Neuro Science Third Floor 1 Department Of Opthalmology 2 Family And Community Medicine Department 3 Department Of Dermatology 4 Opd Philhealth ` Diagnostic Center 1 Main Laboratory 2 Nuclear Medicine 3 Molecular Imaging & Radionuclide Therapy Unit/cobalt 4 Department Of Physical Medicine And Rehabilitation 5 Blood Bank 6 Molecular Laboratory 7 Linear Accelerator (linac) Main Building A & B Basement 1 Health Emergency Management Service/er Head Office 2 Emergency Room 3 Dialysis Unit 4 Pharmacy Satellite 5 Er Triage 6 Er Waiting Area 7 Brachy Therapy Treatment 8 Breast Clinic 9 Mammography Section 10 Toxicology First Floor 1 Ob Main 2 Ob Er 3 Delivery Room And Labor Room 4 Neonatal Intensive Care Unit (nicu) 5 Ob Covid 6 Radiation Oncology Unit 7 Milk Bank 8 Netr Office Second Floor 1 Surgery Ward (1) 2 Operating Room 3 Department Of Anesthesiology 4 Recovery Room 5 Intensive Care Unit (icu) 6 Hemodialysis (stock Room) 7 Catheterization Laboratory 8 Surgical Intensive Care Unit (sicu) 9 Social Service Office 10 Food Hall Third Floor 1 Surgery Ii 2 Pedia I 3 Pediatric Intensive Care Unit (picu) 4 Pedia Ii 5 Department Of Pediatrics 6 Department Of General Surgery 7 Social Service Office Fourth Floor 1 Medicine Ward 2 Philhealth Ward 3 Medicine Department Office 4 Imcu 5 Institutional Review Board 6 Pulmonary/ Respiratory Unit 7 Office Of The Rotator’s Manager Fifth Floor 1 Ob Annex 2 Pantry I. General Requirements: 1. Original Signed Price Quotation 2. Certified True Copy Of The Following: A) Philgeps Certificate/registration No. B) Mayor’s/business Permit 3. Duly Notarized Omnibus Sworn Statement Together With Original Notarized Secretary’s Certificate Or Original Special Power Of Attorney 4. Documentary Requirements Must Be Submitted To The Bac Secretariat Not Later Than The Deadline. Ii. General Conditions: • All Quotations Shall Be Considered Fixed Price, And Not Subject To Price Escalation During Contract Implementation. • Supplier/contractor/ Service Provider Is Entitled To One (1) Quotation Only; Otherwise All Quotations Made Shall Automatically Be Rejected. Iii. Terms Of Payment • Payment Shall Be Based On Actual Deliveries Made By The Supplier/contractor/ Service Provider. • The Terms Of Payment Shall Not Be Later Than Sixty (60) Days After Submission Of Sales Invoice And Complete Supporting Documents By The Supplier/contractor. • Pursuant To Circular Letter No. 2013-16 Of Department Of Budget And Management Dated December 23, 2013, The Supplier/contractor Is Encouraged To Open An Account With The Land Bank Of The Philippines (lbp), The Government Servicing Bank Of The Procuring Entity, To Facilitate Settlement Of Account Payables Due To The Supplier/contractor. All Charges Incurred For Payment Through Bank Transfer With Other Banks Shall Be For The Account Of The Supplier/contractor. Iv. Delivery Term • Delivery Term Shall Be One (1) Year (12 Months) Upon Receipt Of A Notice To Proceed. For Further Inquiries, You May Contact The Bac Secretariat At Mobile No. 0917 104-6556. The Quotation And Requirements Must Be Submitted/delivered To The Following Address: Edwin E. Alcazar, Llb,mgm Head, Bac Secretariat Rizal Medical Center Pasig Blvd., Pasig City 1600 Mobile No. 0917 104-6556 The Rizal Med Reserves The Right To Reject Any Or All Quotations/bids, To Waive Any Minor Defects Therein, To Annul The Bidding Process, To Reject All Quotations/bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder(s), And To Accept Only The Offer That Is Most Advantageous To The Government. The Rizal Med Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expenses Incurred In The Preparation Of Their Quotation/bid. Very Truly Yours, (sgd.)santiago G. Cabangon, Cpa, Mba Chairperson, Bids And Awards Committee
Closing Date20 Jan 2025
Tender AmountPHP 228 K (USD 3.8 K)

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Healthcare and Medicine
United States
Details: Pre-solicitation Notice description this Is A Pre-solicitation Notice Only project No. 526-23-521 Replace Surgical Lights In O.r. 4-10 At The James J. Peters Va Medical Center, Bronx, New York. construction Services general Scope/statement Of Work. the Contractor Must Furnish All Labor, Materials, Tools And Supervision To Complete The Following: replace Surgical Lights In Or S Scope Of Work statement Of Work: this Is A Construction Contract For The James J. Peters Veterans Affairs Medical Center, 130 West Kingsbridge Road, Bronx, New York 10468 To Furnish All Supervision, Labor, Equipment, And Material Necessary To Replace O.r. Surgical In Operating Rooms 4-10 In Wing 2a Of The James J. Peters Va Medical Center. All Work Shall Be Completed In Accordance With All Published Applicable Local/state/federal/national Codes, Ordinances, And Regulations, Along With All Related Va Directives, Design Guides And Manuals, Specifications, And Standards Plus All Va Requirements (federal Or Local) That Are Project Specific To The Documented Scope Of Work On This Site. Contractor Is Required To Visit Site And Meet With Contracting Officer S Representative (cor) Prior To Bidding. scope Of Work: contractor Shall Provide And Install All Infrastructure, And Systems Required To Support The Installation Of Steris Equipment Throughout The Operating Rooms Included Within This Scope Of Work. No Integration Equipment Shall Be Installed Under This Contract Which Is Hexavue Ip Integration System Including: 4k/hd Universal Ports, Surgical Field Monitors, Wall Monitors, Touch Panels, Speakers, Signature Suite Relaxing Multimedia, Printer. Under This Contract The Infrastructure (conduits, Conductors, Junction Boxes, Supports, And Associated Devices Including Ceiling Cameras), Along With The Surgical Lights, Booms, And Supports Shall Be Provided And Installed. For All Junction Boxes That Are To Be Installed Under This Phase For Use With Future Integrations Equipment, The Contractor Shall Provide A Faceplate To Ensure No Exposed Parts. Faceplates Shall Be Sized Per The Associated Junction Box In Which It Is To Be Installed. Due To The Sensitive Location Of The Project, Bronx Va Requires A Dedicated Supervisor For The Project With 7 Years Of Experience In Electrical Engineering Work. Contractor To Field Verify Or Rooms Before The Installation Of The Equipment And Provide For Va Approval Shop Drawings Stamped By A Structural Engineer. Our Existing Equipment Are Steris, So New Equipment Must Be Steris To Be Compliant With Our System. Purity Test Must Be Done By A Third-party Inspection For Medical Gas After All Work Is Finished And Before Return The Medical Gas To Service. All Work Must Be Compliant With Nec And Nfpa Latest Codes. All Work Must Be Compliant With Va Specs And Design Guides Located In The Va Till (technical Information Library: Https://www.cfm.va.gov/til/). project Tasks: remove Existing Booms And Fixtures, Remove Associated Plumbing Connection To Surgical Fixtures, Disconnect Existing Vacuum Connection From Ceiling, Detach Existing Gas Hoses. Disconnect / Remove Existing Connections To Steris Equip, Disconnect / Remove Existing Steris Light Control Panel. Install New Booms With Surgical Lights, All Connection Points Shall Be Identified And Coordinated With The New Surgical Lighting And Equipment Installation To Ensure Complete And Operational Systems, Besides Required Construction But Not Limited To Interior Construction (patch, Repair, And Paint) And Interior Finishes For Floor And Ceiling. Plumbing Includes Installment Of Surgical Fixtures Plumbing Connection, And Medical Gas. Electrical Include Steris Equipment, Electric Boxes, Conduits, Etc. Commissioning Tests Of The Installed Equipment Shall Be Performed Pursuant To Applicable Codes And Standards. All Circuit Breakers, Conduits, Electrical Connections Must Be New. All Circuit Breakers And Conductors Must Be Labeled As Per Nec Codes. phasing: the Intent Of The Phasing For This Construction Is To Minimize Outage Periods. All Work Shall Be Coordinated With The Va Cor. Shutdowns Shall Be Coordinated With The Station At A Minimum Of 4weeks Prior To Requested Time Unless Otherwise Directed By The Va Cor. Contractor Shall Submit A Detailed Phasing Plan For Approval With Dates And Periods Of Performance To The Va Cor And A/e For Approval Prior To The Commencement Of Any Work. Scheduling Shall Be Completed To Ensure Minimal Disruption To Operations. All Equipment Connections Shall Be Verified Prior To The Start Of Work Or Any Scheduled Disruptions To Service. All Periods Of Performance Shall Be Completed During Off Hours (night And Weekend) As Approved By The Va Cor. Contractor Shall Ensure That At The Completion Of The Scheduled Off Hours Work (unless Otherwise Approved By The Va Cor) All Areas In Which Work Had Been Completed Shall Be Returned To Operational Status. To Ensure The Facility Remains In Operational Status The Contractor Shall Schedule Designated Operating Rooms As Per Drawings Phasing Plan (coordinated With The Va Cor) To Perform Work In At Each Phase. safety/site Control: contractor Must Clean And Sanitize All The Carts And Equipment Before Entering The Or. contractor Must Install Icra Hard Barriers With Level 4 Paint Finish For Dust And/or Infection Control Prior To Start Of Construction. furnish And Install Temporary Construction Barrier Walls With Secure 45-minute Rated Construction Access Door And Hardware. Construction Barrier Walls Shall Be 1-hour Rated, Extend To Underside Of Deck Above And All Penetrations Are Fire Stopped. supply, Install And Maintain Walk-off Tacky Mats. Shall Replace Tacky Mats In Timely Fashion When They Are Soiled. maintain Negative Pressure Machine In The Project Site. contractor To Abide With All In House Policies Such As Safety, Id Badges, Security, Etc. alternate Entrance Is Always Secured And Never To Be Left Open While Contractor Is Off Site. quality Control/assurance: follow Manufacturer S Instructions For Inspecting And Installing New Equipment And Fixtures. provide Submittal Log Of All Material And Applicable Equipment, Procedures, And Certifications To The Cor For Approval, Prior To Starting Construction. any Drawings Provided May Not Be Up To Date And Must Be Field Verified By Contractor For Accuracy. provide Updated Ms Project Schedule Upon Request By Engineering Services Withing 2 Working Days. maintenance: provide A Critical Spare Parts List With Pricing And Warranty Information For All Installed Fixtures. coordination Plan: if Any Utilities Need To Be Shut Off For Demolition Or Installation, A Coordination Plan Shall Be Provided To The Cor For Approval, At Least 72 Hours Prior To Work Being Performed. cleanup And Disposal: housekeeping the Contractor Shall Maintain A Clean Work Environment, Keeping Surfaces In The Area Free Of Dust And Debris. Dry Sweeping Or Compressed Air For Cleanup Is Not Authorized. at The End Of Each Work Period (not Longer Than 8 Hours), The Contractor Shall Use A Hepa Vacuum To Ensure All Dust And Debris Have Been Properly Collected And Contained For Disposal. if The Cor And/or Designated Representative, Finds The Area Unacceptable, The Contractor, At His/her Own Cost, Shall Re-clean Until Acceptance Is Gained. The Contractor Is To Perform The Necessary Corrective Action Immediately Without Exception. disposal Of Trash And Hazardous Waste: the Contractor Shall Be Responsible For The Cleanup And Removal Of All Trash And Debris From Va Property After The Government S Final Acceptance Of Work. the Contractor Shall Comply With Local/state/federal/national, Osha, Epa, And All Other Applicable Codes, Ordinances, And Regulations Governing The Proper Handling, Disposal, And Removal Of All Waste And Debris. deliverables: project Deliverables Include The Following: ms Project Schedule Within 45 Days Of Ntp. Include Procurement Of Materials And Critical Path Activities. testing And Acceptance all Equipment Shall Be Tested Prior To The Government S Final Acceptance. All Testing Reports And Specification Documents Must Be Provided To The Contracting Officer Representative, If Applicable. general: all Work Is To Be Coordinated With The Va Cor To Allow For Minimum Disruption To The Building Occupants. all Rigging, Hoisting, Lifting And Moving Of Materials And Equipment Necessary To Perform The Work Is To Be Provided By The Contractor. damage To Any Existing Surfaces Caused By The Contractor Are To Be Repaired To The Original Condition And At The Contractor S Expense. all Materials, Installation Practices, Debris Disposal, And Work Performed As Part Of These Specifications Are To Meet All Applicable Codes Including But Not Limited To, Usepa And Osha. at The Completion Of The Project, All Rubbish, Tools And Surplus Materials Are To Be Removed And The Work Area Left Completely Clean. any Work, Material Or Supplies Which Have Not Been Specifically Mentioned But Are Reasonably Implied And Is Necessary For The Safe And Satisfactory Completion Of The Entire Project Are To Be Included And Installed By The Contractor. all Materials Are To Be Installed And Completed In A First-class Workman Like Manner And In Accordance With The Best Industry Standards. Any Materials Installed Which Are Not In An Orderly And Neat Workman Like Appearance Are To Be Removed And Replaced When So Directed By The Va Cor At The Contractor S Expense. all Workers And Staff Of The Contractor Working On Site Shall Be Required To Have Va Issued Identification Badges For All Of His/her Personnel Working On Va Property. Anyone Observed Without Va Identification Will Be Asked To Leave Va Property. No Va Identification, No Work, No Exception. 13. No Work Or The Ordering Of Materials Outside Of The Scope Of Work Is To Be Done Without An Approved Change Order. site Conditions: 1. All Work Is To Be Coordinated With Va Cor. 2. This Is An Occupied Facility. 3. A Material And Equipment Staging Area Is To Be Coordinated And Confirmed With The Va Cor. The Staging Area Is To Be Considered Unsecure. 4. The Contractor Is To Leave No Area Unsafe At The End Of The Working Day. 5. It Is The Contractor S Responsibility, To Field Verify All Existing Conditions And Dimensions Prior To Submitting Bid. 6. It Is The Contractor Responsibility To Address Unforeseen Conditions And Dimensions. submittals: 1. Submit, For Review And Approval To The Va Cor, The Manufacturers / Supplier S Spec Sheets, Shop Drawings (if Requested), And Any Other Requested Information For All Materials To Be Used As Part Of This Project. 2. Submit Only Materials Which Are Known To Be Fully Compatible With The Actual Installation Conditions. cost Liability: the James J. Peters Va Medical Center Does Not Assume Responsibility And Does Not Bear Any Liability For Cost Incurred By A Bidder In The Preparation And Submittal Of A Bid Proposal In Response To This Request For Proposals. the Contractor Shall Be Responsible For The Actions Of All Individuals Provided To Work For The Va Under This Contract. If Damages Arise For Work Performed By Contractor Provided Personnel, The Contractor Shall Be Responsible For All Resources Necessary To Remedy The Incident. the Contractor Shall Be Responsible For Ensuring All Provided Personnel Are Properly Licensed To Operate A Motor Vehicle If Operating A Motor Vehicle On Va Property Is Required. 7. Protection Of Work And Property 7.1. The Contractor Shall Continuously Maintain Adequate Protection Of All His Work From Damage And Shall Protect The James J. Peters Va Medical Center Property From Injury Or Loss Arising Out Of This Contract. The Contractor Shall Make Good Any Such Damages, Injury, Or Loss, Except Such As May Be Directly Caused By Agents Or Employees Of The James J. Peters Va Medical Center. 7.2. The Contractor Will Erect Barricades And Railings, Give Warnings, Display Lights, Screens Or Signs And Exercise Precautions As May Be Reasonably Necessary To Prevent Injury Or Damage. additional Work should Additional Work Be Required, Which Is Beyond The Scope Of This Request For Proposal But Is Related To The Overall Contract, The Vendor Will Be Requested To Submit A Written Proposal And Upon Approval, A Purchase Order Will Be Issued To Authorize The Work. warranty: 1. The Contractor Shall Guarantee That All Work Performed Will Be Free From All Defects In Workmanship And Materials And That All Installation Will Provide The Capacities And Characteristics Specified. The Contract Further Guarantees That If, During A Period Of One Year From The Date Of The Certificate Of Completion And Acceptance Of The Work, Any Such Defects Will Be Repaired By The Contractor At His Own Cost. 2. Final Inspection Is To Be Done By The Contractor, Va Cor, Using Agency, And End Users Onsite. autodesk Build Construction Management Platform: construction Contractors And A/e Design Firms, Selected By Award To Perform Work At Visn 2 Va Facilities, Are Required To Utilize Visn 2 Autodesk Build Construction Management Platform, Also Called Autodesk Construction Cloud (acc). Access To The Platform And Training Portal Will Be Provided By Visn 2 Through Project Contracting Officer Representative (cor) At No Cost For The Duration Of The Project. Autodesk Build Is The Management And Collaborative Environment That Visn 2 Uses For All Its Non-recurring Maintenance (nrm), Minor Program Projects, Feasibility Studies, Commissioning And Retro-commissioning Contracts.â  There Is No User, License, Or Subscription Fee To The Contractor For Using This Cloud-based Platform. contractor Shall Accomplish And Complete The Following Tasks Upon Award Of Contract: request Access To Acc Platform And Productivitynow Elearning Site To Project Va Cor Nlt 14 Days From Contract Award. only Staff That Shall Utilize The Platform To Be Granted Access. Examples: Project Manager, Sub-contractors Poc, Site Manager, Safety Officer, Etc. the Access Request Shall Be In Writing And Include A List Of Staff. The List Shall Include The Following Information: full Name company Name email Address role/position On The Project (i.e., Project Manager, Site Super) upon Granting Access, Staff Shall Complete Required Acc Training Through Productivitynow Platform Within 12 Calendar Days. upon Successful Completion Of Training, Contractor Shall Submit Certificates Of Completion To Cor Nlt 2 Business Days. access To Productivitynow Elearning Will Expire After 12 Calendar Days After Online Access Is Granted. Contractor Shall Complete Acc Training Within That Period. additional Staff And Subcontractors Can Be Added At Any Time With A Request Submission To The Project Cor As Described Above. the Contractor Shall Only Use The Acc Platform For Contract Required Submissions, Official Project Correspondence To Be Acknowledged, Reviewed, And Actioned By The Responsible Party. No Additional Time Shall Be Added To The Contract, Nor An Increase In Contract Amount Be Provided For The Contractor S Failure To Utilize The Acc Platform As The Project S Official Communication And Collaboration System. Any Correspondence Out Of Platform Shall Not Be The Governing Authority Contradicting Direction And Will Be At The Contractor S Expense. Official Project Correspondence And Collaboration Includes But Not Limited To: Rfis, Submittals, Schedules, Shutdown Requests, Actionable Tasks, Reports, Testing, Safety Inspections, Photos, And Site Surveys. contractor Must Inform The Cor Of Any Staff Changes Nlt 2 Business Days From The Change. Staff Changes Pertains To Staff Who Was Granted Access To The Acc Platform. Contractor Shall Request Termination Of Access, Replacement Of Personnel And/or Any Other Action That Might Impact The Contractor Ability To Maintain Required Utilization Of The Platform. contractor Submission Requirements Cannot Be Accepted For Work To Begin Without Meeting All Acc Platform Requirements Outlined Herein, Including Completing Required Acc Platform Training. period Of Performance work To Begin Within 30 Calendar Days Of Ntp And To Be Completed Within 180 Calendar Days From Ntp. applicable Naics Code: 238210. magnitude Of Construction: Between $1 And $2 Million estimated Completion Time: 180 Calendar Days From Receipt Of Ntp. award Will Depend On Availability Of Funds At Time Of Award. this Procurement Is A 100% Set-aside For A Service-disabled Veteran-owned Small Business (sdvosb). Prospective Contractors Must Be Registered With The Sba Veterans Small Business Certification (vet Cert) At Veteran Small Business Certification (sba.gov) Prior To Submitting A Bid: Prospective Contractors Must Be Registered And Current In The System For Award Management (sam) Database Prior To Contract Award: Https://www.sam.gov/portal/public/sam/ bids Will Only Be Accepted From Sdvosbs That Are Determined To Be Responsible And Responsive Contractors. Prospective Contractors Must Be Approved Under Naics Code 238210, With A Size Standard Of $19.0 Million. The Naics Code Selected Has Been Approved As The Most Appropriate For The Project Related Tasks And Sow. This Naics Code Will Not Be Subject For Discussion Or Change. The Cost Range For This Project Is Between $1,000,000 And $2,000,000. a Bid Bond Will Be Required, And Performance And Payment Bonds Will Be Required Upon Award Of Contract. The Solicitation Will Be Released On Or Around February 14, 2025. The Bid Submittal Address, Date And Time Will Be Included In The Solicitation. Specifications And Plans Will Be Available For Download From The Sam Website At Https://www.sam.gov Amendments To This Solicitation Will Be Posted On The Sam.gov Website As Well. bidders Are Responsible For Obtaining And Acknowledging All Amendments To This Solicitation Prior To The Time Of Bid Opening. All Bid Submissions Shall Be In Hardcopies; Faxed Or E-mailed Bids Will Not Be Accepted. E-mail Questions Concerning The Solicitation To Patricia Cordero At Patricia.cordero@va.gov. responses To This Pre-solicitation Notice Must Include Your Firm S Capability Statement In Writing (email) And Must Be Received No Later Than February 11, 2025, At 4pm Noon Est. Email: Patricia.cordero@va.gov. No Telephone Inquiries Will Be Accepted.
Closing Date11 Feb 2025
Tender AmountRefer Documents 

City Of Koronadal Water District Tender

Others...+1Electrical and Electronics
Philippines
Details: Description Item No. Specification Statement Of Compliance “comply” Or “not Comply” 1 Supply, Delivery, Installation, Testing And Commissioning Of Supervisory Control And Data Acquisition (scada) System For Koronadal Public Market Water Supply System A. General 1. Scope A. The Scope Of Work Shall Be To Supply, Install, Test And Commission The Supervisory Control And Data Acquisition (scada) System For Koronadal Public Market. All The Required Parameters Shall Be Transmitted To City Of Koronadal Water District Main Office As The Central Command Center. B. The Scada System, In General, Performs The Following Tasks But Not Limited For Specified Parameters: I. Monitoring Functions Ii. Controlling Functions Iii. Graphical Displaying Functions Iv. Reporting Functions V. Alarming Functions Vi. Trending Functions Vii. Data Storage Viii. Other Related Functions That May Be Required By The Ckwd Not Stated Herein. 2. Conditions A. The System And Instruments Should Be Brand-new Specifically The Programmable Automation Controllers, Sensors, Variable Frequency Drives (vfd), Pumps, Motors, Electromagnetic Flowmeters, And Scada Software. B. The Supplier Shall Furnish All Labor, Materials, Tools, Equipment, Transport, Supplies And Other Services To Complete The Scada System And Shall Be Responsible For The Proper Installation Of The Supplied Equipment And Software. C. The Supplier Shall Install The Equipment And System Within One Hundred Twenty Days (120) Days After Signing Of Notice To Proceed (ntp). The 15-day Time Frame Shall Be Allotted In Order To Check The Proper Alignment Of The Pump/ Motor Assembly And Make Necessary Corrections Of Both Mechanical And Electrical Failures Found During Installation And Construction. The Supplier Shall Inform The Ckwd Measures And Proper Procedures On Its Operation To Guarantee A Smooth And Proper Function Of The Newly Installed Units And System. D. Field-testing Shall Be Made Once The Mounted Equipment Is Ready For Operation And When Both The Ckwd And Supplier Have Finished Their Scopes Of Work On The Installed Unit. During The Installation And Commissioning Of The Scada System, The Supplier Is Required To Assign A Technician Responsible For Overseeing The Commissioning Process. All Associated Costs, Including Transportation, Accommodation, Allowances, And Other Incidental Expenses, Shall Be Covered By The Supplier. E. The Supplier Shall Be Liable For Any Damages To Materials, Electro-mechanical Equipment’s Such As But Not Limited To Pumps And Motors, Variable Frequency Drive (vfd), Flowmeter, Level And Other Electro-mechanical Devices During Testing And Commissioning Of The Scada Project And Shall Be Required To Replace Immediately To Any Incur Defects Without Cost To Ckwd. All Incidental Expenses Including The Pulling Out And Transporting Of The Unit Shall Be Borne By The Supplier. F. In Accordance With The Electricity Safety Regulations, Supplier Is Strictly Prohibited From Connecting, Or Allowing To Remain Connected, Any Wiring Or Equipment In Unsafe Conditions To An Electrical Installation Or Power Supply. Additionally, To Control Hazardous Energy Sources, Standard Regulations Require That Machinery And Equipment Be Isolated From Their Energy Sources And Secured With A Lockout Or Tagout System Before Any Servicing Or Maintenance Is Performed. G. The Supplier Shall Provide A Comprehensive Warranty Covering All Parts And Labor For A Minimum Period Of One Year From The Date Of Delivery And Installation Of The Equipment And System. H. In Case Of Any Malfunction, Defect, Or Failure Of The Equipment And System During The Warranty Period, The Supplier Shall Offer Repair Services At No Additional Cost To The Buyer. I. The Supplier Must Respond To A Warranty Repair Request Within 24 Hours Of Notification By The Buyer. The Supplier Is Required To Complete The Repair Or Provide A Replacement Within A Maximum Lead Time Of 1 Week From The Time Of Notification. This Includes The Time For Diagnostics, Shipping Of Parts, And On-site Or Off-site Repair As Necessary. J. If The Repair Cannot Be Completed Within The 1-week Lead Time, The Supplier Must Provide A Temporary Replacement Of Equivalent Specifications At No Extra Cost To The Buyer, Until The Original Equipment Is Repaired And Returned To Full Working Condition. K. The Supplier Is Required To Maintain High Standards Of Housekeeping Throughout The Entire Project Duration. They Shall Be Fully Responsible For Managing And Securing Their Own Materials, Equipment, And Tools To Prevent Any Potential Accidents Or Safety Hazards In The Workplace. L. All Equipment/ Materials Must Be Brand New. 3. Location The Assembly Shall Be Installed At Koronadal Public Market, Purok Kaunlaran, Brgy. Zone I, City Of Koronadal. 4. List Of Major Components Item No. Item Quantity 4.a Programmable Logic Controller 1 4.b Human Machine Interface (hmi) 1 4.c Scada Software 1 4.d Workstation Pc 1 4.e Ethernet Switch 2 4.f Un-interruptible Power Supply 1 4.g Monitor 55" 1 4.h Wireless Antena (tx/rx) With Pole 2 4.i Variable Frequency Drive 2 4.j Pumps & Motors 2 4.k Water Level Monitoring Transmitter 4 4.l Electromagnetic Flowmeter 1 4.m Power Meter 1 4.n Fabricated Coated Panels W/ Complete Assembly 1 4.o Surge Protection Device 1 4.p Butterfly Valve With Actuators 2 4.q Pressure Transmitter 2 5. Major Components Specifications It Shall Meet The Following Operating Requirements: Description Specifications 5.a Programmable Logic Controller Digital Input 28 24 Vdc/vac Inputs, Up To 6 High Speed Counter Channels Relay Output 20 Relay Output Power Supply 24 Vdc Communication Embedded Usb Programming Port, Ethernet Port, Non-isolated Rs232/485 Serial Port Plug-in Ports 5 Plug-in Ports, Up To 4 Expansion Modules 5.b Human Machine Interface (hmi) Display 10.4 In. Display, Aluminum Panel With Resistive Touch Resolution 800x600 Or Higher Case Zinc-coated Skin Pass Steel Power Supply 24vdc (9 - 32vdc) Isolated Interface Ethernet: 2x Gigabit Ethernet (rj45), Usb: 2x Usb 3.0 (type-a / Host) Serial: 1x Rs232/422/485 (db9m) Isolated Operating Temperature 0° - 50°c Approvals Ce, Culus Listed, Ukca, Atex, Kc, Rcm 5.c Scada Software Scada Should Support Unlimited Displays, Unlimited Web Clients And Tags To Accommodate Future Integration With Our Pumping Stations. For Future Expansion, Scada System Shall Have Dual Monitor Capability To Provide Enhanced Visibility And Operational Efficiency. Data Logging To Odbc-compliant Database Such As Microsoft Sql Server Or Historian. 5.d Workstation Pc Cpu At Least 12th Gen Or Higher Intel Core I5 Storage (os) 256gb M.2 Gen 4 Nvme Ssd Storage (data) 2x1 Tb 7200 Rpm Hdd Or Higher Raid 0, 1, 5 Support Operating System Windows 10 Pro Or 11 Pro Memory 8gb Non-ecc Ddr5 Or Higher Display Output 2 X Displayport 1.4a Hbr2 Ports Ethernet Port Rj45 (1 Gbe) Ethernet Port Chassis/form Factor Tower 5.e Ethernet Switch Type Managed Switch Rj45 Ports Minimum 5x10/100baset Operating Temp -20 ~60 Deg. C Vlans Supported Secure Connectivity With Ssh And Https Supported 5.f Un-interruptible Power Supply Supplied Scada Product Must Have The Capacity/facility To Contain Battery-backed Memory For The Duration Of At Least One (1) Day Dedicated For The Plc's Programming And Configuration. System Must Be Able To Send Alerts For Power Outages. An Industrial Type Uninterruptible Power Supply (ups) Must Be Present For Plc Back-up For At Least Fifteen (15) Minutes. It Must Also Support Local And Remote Firmware Upgrade. 5.g Monitor Size: At Least 55" Mounting: Wall Mounted, Inclusive Of Installation 5.h Wireless Antenna (tx/rx) With Pole (communication Complete Set) Power Supply 24v, 0.3a Gigabit Poe Adapter Max. Power Consumption 7w Power Method Passive Poe Gain 23 Dbi Networking Interface (1) 10/100/1000 Ethernet Port Wind Survivability 200 Km/h Security Wpa2 Long-range Point-to-point (ptp) Link Mode 5.i Variable Frequency Drive Motor Power, Hp [kw] 1 Step Higher For 10hp Motor Ac Voltage Range 380v – 500v Voltage % Tolerance +10%, -15% Supply Number Of Phase 3 Phase Total Harmonic Current Distortion (thdi) 30 – 45% Prospective Short Circuit Current (kaic Rating) 65ka Nominal Current 52a Enclosure Rating Ip55 Local Control Panel W/mobile Phone Bluetooth Connectivity And Clear Display Vfd Features Motor Pre-heating Function Built-in Pid Control Built-in Safe Torque Off (sto) Function Full-text Diagnostic Display Dtc Control For Precise Torque Control And Enhance Energy Efficiency Removable Memory Unit For Faster Drive Replacement Digital Variable Frequency Drive That Is Scada Ready And Has Integrated Emc Filter. Complete Protection Against Over/under Voltage, Thermal Overcurrent, Lock Rotor, Ground Fault, Under Current, Definite Time Overcurrent. Digital Monitoring Of Voltage, Current, Frequency, Energy, Kw, And Fault History The Vfd Will Be Controlled Via Fieldbus. Status Updates, Diagnostic Faults, And Alarms Will Be Visible On Both The Hmi And Scada System. 5.j Pumps & Motors Number Of Pump And Motor 2 Units Pump Type Vertical In-line Maximum System Pressure 120 Psi Actual Calculated Flow 3.5 Liters Per Second Maximum Flow 5.0 Liters Per Second Mains Supply 230v Resulting Head Of Pump 35 Meters Head (maximum) 50 Meters Manifold Sizes (inlet And Outlet) 100 Mm Pump Parts In Contact With The Pump Liquid Made Of Stainless Steel Pump Bases And Heads Made Of Cast Iron; Other Vital Parts Are Made Of Stainless Steel Motor Rating 5 Hp, 230v, 3 Phase, 60 Hz 5.k Water Level Monitoring Transmitter Principle Radar Sensor Range Up To 8 Meters Output 4-20ma Beam Angle 8° Operating Voltage 12 - 35 V Dc Protection Rating Ip66 Or Higher Maintenance-free Operation Due To Non-contact 80 Ghz Radar Technology 5.l Electromagnetic Flowmeter Sensor Size Mm (in): 150 (6) Environment Protection Rating: Ip67/nema 6 Accuracy: ±0.2% Qmax (m3/hr): 700 Or Higher Qnominal (m3/hr): 600 Or Higher Qtransitional (m3/hr): 5 Qmin (m3/hr): 3.5 Or Lower Cable: 20 Meters (capable Upto 100m Or Higher) Flange Type Connection: Pn16 Lining Material: Elastomer Flange Material: Carbon Steel Housing Material: Carbon Steel Measurements: Direct/inverse Flow Transmitter Transmitter Mounting: Remote Power Supply: 85 To 265 V Ac Current Output: 4 To 20 Ma Security: Read-only Switch And Ultra-secure Service Password Digital Outputs: Three (3) Configurable Pulse/frequency And Alarm Outputs Fit-and-flow Data Storage Inside The Flow Meter Which Eliminates The Need To Match Sensor When Replace Self-calibrating Capabilities 5.m Power Meter Data Port Ethernet Interface Modbus Tcp Or Its Equivalent Supply Voltage 95-240v Ac; 110-340v Dc Digital Input 1 Or Higher Digital Output 1 Or Higher Degree Of Protection Ip65 Or Higher 5.n Fabricated Coated Panels W/ Complete Assembly Shall Provide Newly Fabricated Powder Coated Panels With A Complete Set Of Wiring Consumables For Network And Monitoring Of All Required Parameters. - Programmable Logic Controller - Human Machine Interface (hmi) - Io Modules - Circuit Breaker Protection - Power Meter - Surge Protection Device - Uninterruptible Power Supply - Exhaust Fan Shall Be Installed Inside The Control House And Shall Be Properly Ventilated 5.o Surge Protection Device Protection Performance Maximum Of 30 Microsecond Radius Of Protection 72 Meters Minimum 5.p Butterfly Valve With Actuators Size In (mm) 6” (150) Butterfly Valve Body Material Cast Iron Butterfly Disc Stainless Steel 304 Or 316 5.q Pressure Transmitter Measuring Range 0 To 16 Bar G (0 To 232 Psi G) Or 0 To 25 Bar G (0 To 363 Psi G) Current Output Signal 4-20 Ma Degree Of Protection Ip65 Or Higher 6. List Of Human Machine Interface (hmi) Alarms Item No. Alarm Descriptions 6.a Under Voltage 6.b Over Voltage 6.c Over Current 6.d Water Level Reservoir (cistern) Low Level 6.e Water Level Reservoir (cistern) High Level 6.f Water Level Right Building Low Level 6.g Water Level Right Building High Level 6.h Water Level Left Building Low Level 6.i Water Level Left Building High Level 6.j Discharge Line High Pressure 6.k Discharge Line Low Pressure 6.l Low/high Flowrate 6.m Submersible Motor Tripped 6.n Motor Control Panel High Temperature 6.o Motorized Valve (on/off Status) 6.p Vfd Alarms 7. System Architecture 8. Personnel Requirements The Contractor Shall Provide The Minimum Number Of Personnel For The Project, As Detailed In The Table Below. These Roles And Responsibilities Ensure Thorough Coverage Of All Project Aspects. Quantity Description 1 Project Engineer (pee) 2 Technical Engineers (electronics And Communications Engineer) 2 Technical Engineers (registered Electrical Engineer) To Ensure Qualified Personnel, All Professionals Must Have A Valid Unexpired Prc License. 9. Schedule Of Payment The Contract Duration Is One Hundred Twenty (120 Cd) Calendar Days Starting Upon Receipt Of Notice To Proceed. All Reports And Related Documents Must Be Submitted To The City Of Koronadal Water District Project Engineer And Should Be Officially Acknowledge Monthly. The Following Are The Schedule Of Payments: Payment Description Percentage Of Contract Price Remarks First Payment Upon Completion Of Item Orders 10% Must Submit Certification That All Components Are Ordered, Attached Proof Of Order From Suppliers Second Payment Upon Delivery Of All Items At Ckwd Facility 30% Must Compile And Submit All The Delivery Receipt Acknowledge By Ckwd Personnel Third Payment Upon Reaching 40% Of Project Accomplishment 30% Must Submit Certification That The Project Reached 40% Of Its Completion And Approved By The Ckwd Project Engineer Final Payment Upon Project Completion And Acceptance 30% With 5% Retention Upon Completion Total 100% B. Additional Requirements (compliance Upon Submission Of Bid) 1. Must Submit Original Catalog / Brochure For Vfd, Pump And Motor, Flowmeter, And Valve (please Specify Offered Product). 2. The Manufacturer Should Have Iso 9001:2015 Certificate Or Any Proof Of Renewal If Expired. 3. Minimum Manufacturer's Warranty Of One (1) Year. 4. Certification On Compliance To The Following: A. Reports: Indicate All The Fault Alarms From Vfd, Pressure, Flow, Level, And Other Protective Devices To Command Center. B. Trends And Data Logging: That Ckwd Will Provide The List Of Variables To Be Included In The Trend And Shall Be Logged Continuously In The Hard Drive For Historical Trending With Reference To The Monitoring Requirements. C. After Sales Service: After The Final Acceptance, The Contractor Shall Conduct A Monthly Site Visit Within The Warranty Period. The Contractor Shall Have 24/7 Availability Of Technical Engineers Within Mindanao Island. Must Submit Notarized Statement Of Undertaking Stipulating Availability Of Skilled Personnel Within Mindanao. D. Site Visit: The Bidder Shall Conduct A Site Visit/survey On Or Before The Pre-bid Conference Schedule To Ensure That They Know The Status/set Up Of The Project Site. Must Submit Certification Signed By Ckwd Project Engineer In-charge. E. Warranty: All Components Shall Be Guaranteed Against Defects In Workmanship And Materials For A Period Of One (1) Year From The Date Of Project Completion. Defective Components Or Parts Discovered Within The Warranty Period Shall Be Replaced Without Charge Or Additional Cost To Ckwd. 5. Bidders Qualifications: A. Must Submit Certification Or Any Document That The Bidder Has A Regional Presence Or A Regional Service/support Partner/center Within Mindanao. B. Bidder Must Be An Authorized Distributor From Manufacturer. Must Submit Certificate Of Distributorship. C. Bidder Must Have A Pcab License. D. Bidder Must Have An Experience Of Having Completed At Least Three (3) Contracts That Is Similar To The Contract To Be Bid. (indicate In The Form Of Statement Of All On-going Government & Private Contracts Including Contract Awarded But Not Yet Started.) E. Bidder Must Have Been In The Business For At Least Five (5) Years Of Providing Scada System Solution And Services In Government Or Private Sectors. Must Submit Dti Or Sec Registration. C. Additional Requirements (compliance Upon Delivery) 1. The Supplier’s Technical Representative Shall Be Present During Installation And Commissioning For Final Testing. 2. Must Submit Comprehensive Documentation, Including But Not Limited To Operation Manuals, Datasheets, And Manufacturers’ Certificates For All Electrical And Mechanical Components. 3. Trainings/transfer Of Technology: The Winning Bidder Shall Provide Inhouse Training On The Following Working Subject Matters: A. Plc And Scada Software Programming B. Installation C. Configuration D. Calibration E. Troubleshooting/operations And Maintenance All Associated Costs, Including Transportation, Accommodation, Allowances, And Other Incidental Expenses, Shall Be Covered By The Supplier.
Closing Date6 Jan 2025
Tender AmountPHP 3.7 Million (USD 63.7 K)

Western Philippines University Tender

Education And Training Services
Philippines
Details: Description 1 1 Copy Advanced Marketing Management/abante, Etc/2024 2 1 Copy Advanced Local Government And Regional Administration Development/abante, Etc/2024 3 1 Copy Advanced Production And Operation Management/abante, Etc/2024 4 1 Copy Advanced Public Fiscal Management, Finance And /abante, Etc/2024 5 1 Copy Assessment Of Learning 1/manas/2024 6 1 Copy Banking And Financial Institutions/bairan/2024 7 1 Copy Capital Markets/bairan/2024 8 1 Copy Charater Formation 1-patrotism And Nationalism/adra, Etc/2024 9 1 Copy Character Formation 2-leadership Making , Management And Administration/adra, Etc/2024 10 1 Copy Character Formation 1- Patriotism And Nationalism 3rd Ed./rondina, Etc/2024 11 1 Copy Character Formation 2-leadership Making , Management And Administration 3rd Ed./literfal, Etc/2024 12 1 Copy Comparative Model In Policing 4th Ed./castillo, Jr./2024 13 1 Copy Comparative Models Of Policing And Philippine National Police Policing ( Based On Prc Tos)/depayso/2024 14 1 Copy Criminological Research 2nd Ed./chavez, Etc/2024 15 1 Copy Criminological Research A Self Study Guide/depayso/2024 16 1 Copy Dispute Resolutions And Crises/incident Management/cano, Etc/2024 17 1 Copy Essentials Of Risk Management/banaag/2024 18 1 Copy Evidence/gabao/2024 19 1 Copy Facilitating Student-centered Teaching & Learning/larioque. Etc/2024 20 1 Copy Financial Analysis And Reporting/bairan/2024 21 1 Copy Financial Markets/bairan/2024 22 1 Copy Forensic Examination On Questioned Documents 5th Ed./alvarez/2024 23 1 Copy Forensic Photography 6th Ed./bulan/magadia/2024 24 1 Copy Fundamentals Of Criminal Investigation And Intelligence/tad-awan/2024 25 1 Copy Handbook In Juvenile Deliquency And Violence Againts Women And Their Children/barican/dausan/abordo/2024 26 1 Copy Human Behavior And Victimology /depayso/2024 27 1 Copy Human Development-understanding Criminal Behavior And Victimology/togana/2024 28 1 Copy Inclusive Education In Early Childhood Settings/boholona, Et Al./2024 29 1 Copy Income & Business Taxation/bairan/2024 30 1 Copy Introduction To Consumer Behavior/pasahol/2024 31 1 Copy Introduction To Criminology /caballero/barican/2024 32 1 Copy Introduction To Criminology/cabrillas, Et Al/2024 33 1 Copy Introduction To Cybercrime & Basic Digital Investigative Analysis 3rd Ed/lagumen/lagumen/2024 34 1 Copy Introduction To Cybercrime Investigation And Environmental Laws And Protection/detran,et Al/2024 35 1 Copy Introduction To Industrial Security Concepts /depayso/2024 36 1 Copy Introduction To Industrial Security Concepts 4th Ed/bobier/2024 37 1 Copy Juvenile Delinquency And Juvenile Justice System 2nd Ed./detran/literal/2024 38 1 Copy Law Enforcement Operationss And Planning With Crime Mapping/tancangco/2024 39 1 Copy Non- Institutional Corrections 3rd Ed/chavez Et Al./2024 40 1 Copy Practical Methods On Roads-bridge & Drainage Structures Construction/porte/2024 41 1 Copy Retail And Wholesale Enterprises/bairan/2024 42 1 Copy Special Crime Investigation With Interview And Interrogation Protocols/domingo/2024 43 1 Copy Special Education Book 1/reyes, Pascual/2024 44 1 Copy Strategic Operations Management 2nd Ed./serrano/2024 45 1 Copy Survey Of Afro-asian Literature/escalada-cordova,uytico/2024 46 1 Copy Principles Of Total Quality Management/pasahol, Etc/2024 47 1 Copy The Contemporary World/mananay,etc/2024 48 1 Copy The Teacher And The School Curriculum/gallardo/ Mañas/ 2024 49 1 Copy Theories Of Crime Causation/salamanca, Et Al/2024 50 1 Copy Teaching And Assessment Of Grammar/manas/2024 51 1 Copy Therapeutic Modalities 3rd Ed./balares Et Al./2024 52 1 Copy The Teaching Profession In The 21st Century/sarandi, Babao/2024 53 1 Copy The Teaching Profession/fernando,et Al/2024 54 1 Copy Traffic Management & Accident Investigation With Driving 2nd Ed./apela, Et Al./2024 55 1 Copy Understanding Marketing Research/mutya/2024 56 1 Copy Vice And Drug Education And Control 4th Ed/cejes/libres/ 2024 57 1 Copy Vice And Drug Education And Control /tad-awan,et Al./2024 58 1 Copy Advance Management Information System/abante,et Al./2023 59 1 Copy Computer Fundamentals/revano/2023 60 1 Copy Data Analytics & Business Intelligence/abante,et Al/2023 61 1 Copy Dispute Resolution And Incident Management/capdos/lud-ayen/2023 62 1 Copy Information Management/cortez/2023 63 1 Copy Franchising/stevens/2024 64 1 Copy Advanced Management Information Management System (mis)/abante,et.al/2023 65 1 Copy Introduction To Application Development And Emerging Technologies/pomperada/2023 66 1 Copy Principles Of Foundation Engineering Based On The National Structural Code Of The Phils. 2015/castro/2023 67 1 Copy Simplified Steel Design Asd & Lrfd Based On Nscp 2015 & Aisc's Steel Construction And Manual 14e/2023/castro 68 2 Copy Teaching Science In The Elementary Grades Vol. 2: Physics, Earth And Space Obe- & Ppst Based/bilbao, Etc/2024 69 2 Copy The Teacher And The School Curriculum Obe Approach/otiner-gallardo/2024 70 2 Copy Theoretical And Practical Textbook On Lesson Planning/ Sanchez/2024 71 2 Copy Ang Bisa Ng Pag Uulit Sa Katutubong Panitikan/yapan, Alvin B./2023 98 2 Copy Introduksiyon Sa Pananaliksik Sa Wika At Panitikan (luzon)/alvarado Et Al/2022 99 2 Copy Introduksiyon Sa Pananaliksik Sa Wika At Panitikan (vizmin)/arbasto Et Al/2022 100 2 Copy Sangguniang Aklat Ng Gramatika At Pagbuo Ng Mapa/alvarado Et Al/2023 101 2 Copy Sinesosyedad: Panunuri Ng Piling Pelikulang Panlipunan/de Leon/2023 102 2 Copy Commissary Food Service/donray/2024 103 2 Copy Readings In Philippine History/dela Vega/2024 104 2 Copy Rizal And The Development Of Filipino Nationalism /garcia, Etc/2023 105 2 Copy Transcendence: Understanding Contemporary Global Dynamics, Issues, And Challenges/calilung And Coronacion/2024 106 1 Copy Environmental And Natural Resources Laws With Commentaries, Annotations… ( Hb)/claridades/2024 107 2 Copy Introduction To Philippine Politics & Governance ( With Basic Constitutional Provisions)/baes & Beler/2024 108 2 Copy Introduction To Philippine Government And Politics With Basic Constitutional Principles 2e/riodique/2024 109 2 Copy Mathematics In Modern World/reynoso, C./2024 110 1 Copy Indigenous Creative Arts/camboles, M./2024 111 1 Copy Understading The Self/vazquez, I./2024 112 1 Copy Understanding The Self: New Normal Edition/palean,et.al/2024 113 2 Copy Biological Chemistry Obe-based/chua,et.al/2022 114 2 Copy Earth Science: Quaternary Earth, The Age Of Humans, 2e/reyes/2023 115 1 Copy Physical Science/santos/2023 116 2 Copy Gender And Society/bacolod, Et Al. /2024 117 2 Copy The Revised Penal Code Book I - Understanding Criminal Law 2nd Edition/tulalian/2024 118 2 Copy Fundamentals Of Criminal Law - Revised Penal Code Book 1/abastillas /manlusoc/2023 119 2 Copy The Revised Penal Code Book Ii, Specific Crimes And Their Elements 2nd Edition/tulalian/2024 120 2 Copy Criminal Procedure A Handbook For Criminology Students 3rd Edition/gabao/ Tulalian/2024 121 2 Copy Basic Criminal Procedure/tulalian/2022 122 2 Copy Introduction To Criminology/magtaan/ Cabrillas/2024 123 2 Copy Introduction To Criminology - A Guidebook For Criminology Instructors And Students/caballero/ Barican/2024 124 2 Copy Introduction To Criminology/rectin/2023 125 2 Copy Theories Of Crime Causation - An Instruction And Learning Guide/caballero/ Barican/2024 126 2 Copy Human Behavior And Victimology/depayso/2024 127 2 Copy Human Development - Understanding Criminal Behavior And Victimology/togana/2024 128 2 Copy Handbook In Human Behavior And Victimology/dausan Et Al/2023 129 2 Copy Professional Conduct & Ethical Standards/lud-ayen/2023 130 2 Copy Police Professional Conduct And Ethical Standards With Police Community Relations/dascil /santos/2022 131 2 Copy Handbook In Juvenile Delinquency And Violence Against Women And Their Children/barican /dausan/ Abordo/2024 132 2 Copy Dispute Resolutions And Crises / Incident Management/caño/2024 133 2 Copy Dispute Resolution And Incident Management/capdos/ Lud-ayen/2023 134 2 Copy The Research Recipe - A Guide To Writing Research Proposals In Criminal Justice (first Serving)/donato/2024 135 2 Copy Criminological Research - A Self Study Guide/depayso/2024 136 2 Copy Criminological Research 2 - A Textbook For Criminology Students/caño/2023 137 2 Copy Comparative Models Of Policing And Philippine National Police Policing (based On Prc Tos 2022)/depayso/2024 138 2 Copy Comparative Models In Policing/moyao/2023 139 2 Copy Introduction To Industrial Security Concepts/depayso/2024 140 2 Copy Law Enforcement Operations And Planning With Crime Mapping/tancangco/2024 141 2 Copy Law Enforcement Operations And Planning With Crime Mapping/taynan /lopez/2023 142 2 Copy Law Enforcement (police) Operations And Planning With Crime Mapping/florendo/2023 143 2 Copy Fingerprint - Uniqueness And Persistency Of Friction Ridge Skin Volume 1/rocamora/2023 144 2 Copy Forensic Science 2 - Personal Identification Laboratory Manual/badua/2023 145 2 Copy Forensic Photography/tad-awan/2023 146 2 Copy Deceptive Minds - Unmasking The Art Of Lie Detection/moyao/2024 147 2 Copy Introduction To The Forensic Sciences/taduran/2024 148 2 Copy Fundamentals Of Criminal Investigation And Intelligence/ Lopez/ Taynan Jr./2024 149 2 Copy Fundamentals Of Criminal Investigation And Intelligence/tad-awan/2024 150 2 Copy Essentials In Criminal Investigation/tamayo/2023 151 2 Copy Fundamentals Of Criminal Investigation With Intelligence 2nd Edition/florendo/2023 152 1 Copy Specialized Crime Investigation With Legal Medicine/dascil /santos/2023 153 1 Copy Special Crime Investigation With Interview And Interrogation Protocols/domingo/2024 154 1 Copy Vice And Drug Education And Control/tad-awan/ Lud-ayen/2024 155 2 Copy Introduction To Cybercrime And Environmental Laws/tad-awan/2024 156 2 Copy Introduction To Cybercrime And Environmental Laws/caño/2023 157 2 Copy Institutional Correction For Criminology Students/villaluz/2024 158 2 Copy Institutional Correction (new Curriculum And Cle Tos Compliant)/tumitit/ Estoque/2023 159 1 Copy Non-institutional Correction (community-based Correction In The Philippines) For Criminology Students/villaluz/2023 160 1 Copy Non-institutional Corrections/danglosi/2023 161 1 Copy Therapeutic Community Modality 1/foronda/2023 162 1 Copy Moral Philosophy And Ethics/bacuyag/2024 163 1 Copy Guiness World Records 2024 164 1 Copy Introduction To Ethics/umali,et Al/2023 165 1 Copy Leisure And Recreation Management For Tourism And Hospitality Industry/cornell/2023 166 1 Copy Living In The Information Technology Era/abante/2023 167 1 Copy Management Science ( Quantitative Methods For Business Operations Research)/sirug/2023 168 1 Copy Methods Of Research In Business Education 2nd Edition/flores/2023 169 1 Copy Professional Conduct And Ethical Standards 2nd Ed./nabe/2023 170 1 Copy Professional Salesmanship/camillar-serrano/2023 Ppc Library 171 1 Copy Criminal Justice System The Philippine Context/atty. Tutalian, V./ 2022 172 1 Copy Introduction To Criminology - A Guidebook For Criminology Instructors And Students/caballero/ Barican/ 2024 173 1 Copy Introduction To Criminology And Psychology Of Crimes/leyaley/2021 174 1 Copy Comprehensive Correctional Administration Handbook With Therapeutic Modalities/apela/2019 175 1 Copy Crime Theories, Causes & Prevention/domingo, C./2023 176 1 Copy Law Enforcement Administration 3rd Edition/manwong / 2021 177 1 Copy Law Enforcement Organization And Administration Inter-agency Approach / Taynan /lopez / 2021 178 1 Copy Comparative Models In Policing/moyao/2021 179 1 Copy Comparative Models Of Policing And Philippine National Police Policing (based On Prc Tos 2022)/2024/depayso 180 1 Copy Comparative Models In Policing 3rd Ed./ Castillo / 2023 181 1 Copy Institutional Correction For Criminology Students/ Villaluz/2024 182 1 Copy Introduction To Industrial Security Concepts/ Depayso / 2024 183 1 Copy Introduction To Industrial Security Concepts 3rd Ed. D. Bobier/2023 184 2 Copy Special Crime Investigation 1 With Legal Medicine Instructional Modules/ Rogo, A./2022 185 2 Copy Special Crime Investigation With Interview And Interrogation Protocols/ Domnigo/ 2024 186 2 Copy Special Crime Investigation With Legal Medicine 2nd Ed./2023/pltcol Sabino-diangson 187 2 Copy Character Formation 2 - Leadership, Decision Making, Management And Administration 2nd Ed/b. Literal .et.al/2023 188 2 Copy Character Formation 1 Nationalism And Patriotism 2nd Edition/caballero/ Barican/2023 189 2 Copy Forensic Photography For Criminology Students And Practitioners With Laboratory Manual 3rd Edition/2022/villarba 190 2 Copy Forensic Photography 5th Ed./m.e. Bulan/m.e. Magadia/2023 191 2 Copy Fingerprint Uniqueness Abd Persistency Of Friction Ridge Skin Vol. 1/rocamora/ 2023 192 2 Copy Fingerprint Identification (do Fingerprints Lie?)/ Leyaley/2021 193 2 Copy Human Rights Education 2nd Ed. /l.c. Rondina/m. Seguido/2023 194 2 Copy Human Rights Education A Textbook Fro Criminal Justice Education Students And Law Enforcers/tantangco And Orlain, Jr./2022 195 2 Copy Police Professional Conduct And Ethical Standards With Police Community Relations/dascil & Santos/2022 196 2 Copy Technical English 1 & 2 (legal Forms) For Criminology Students/balares/2023 197 2 Copy Technical English ( Investigative Report Writing) For Criminology Students/zaspa & Manlangit/2022 198 2 Copy Therapeutic Community Modality 1/2023/foronda 199 1 Copy Compendium Of Laws On Taxation Revised Ed, Year 2023/dascil, R./2023 200 1 Copy Basic Approach To Income Taxation/ Dimaapao/2021 201 2 Copy Income & Business Taxation/ Basiran/2024 202 1 Copy Income Taxation Laws Principles And Applications 2023-2024 Edition. Banggawan/2023 203 1 Copy Introduction To Special Civil Action/tulalian, V.t./2021 204 2 Copy Introduction To Public Administration 2e/bihasa, Cr./2022 205 2 Copy Pricing Strategy Obe Approach/agustin-acierto, M/2022 206 2 Copy Administrative And Office Management 1e/ Magno, R./2024 207 2 Copy Basic Financial Management In The Philippine Setting Obe Approach/martin, M/2022 208 2 Copy Business Laws And Regulations /dela Cruz-cada/2021 209 2 Copy The Law On Obligations And Contracts/de Leon, H./2021 210 2 Copy Essentials Of Administrative Office Management/sergote/2022 211 2 Copy Executive Leadership Advisory & Development: A Comprehensive Guide For Graduate Program Students/2024 212 1 Copy Ethics In Public Service ( Hb)/ Aquino/2023 213 1 Copy Public Fiscal Policy And Administration (hb)/gupta, S./2023 214 1 Copy Destination Management & Marketing/arenas/2022 215 1 Copy Macro Perspective Of Tourism And Hospitality/yeung/2023 216 1 Copy Marketing For Tourism And Hospitality Obe Approach/camilar-serrano, A./2020 217 1 Copy Micro Perspective Of Tourism And Hospitality/bajao Et.al/2022 218 1 Copy Kitchen Essentials & Basic Food Preparation/remaneses, Et.al/2023 219 1 Copy Kitchen Essenttials And Basic Food Preparation 2e/velasquez/2024 220 1 Copy Cost Control In Hospitality Industry/fababaer,et.al/2020 221 1 Copy Strategic Management In Tourism And Hospitality Industry W/ Total Quality Mgt./vizconde Et. Al/2021 222 1 Copy Supply Chain Management In Hospitality Industry 2e/de Castro, K/2024 223 1 Copy Ergonomics And Facilities Planning For The Hospitality Industry 2e/ Mendoza/2024 224 1 Copy International Business & Trade /lopez-mariano, N/2023 225 1 Copy International Business & Trade Obe Approach/martin, M./2021 226 1 Copy Synergizing E-commerce, Social Media, And Dropshipping: Navigating The Path To Success & Customer Satisfaction Obe Approach/garcia,et.al/2023 227 1 Copy Total Quality Management Obe Approach 2e/camilar-serrano, A./2023 228 1 Copy Banking And Financial Institutions/ Bairan/2024 229 1 Copy Personal Finance 2022 Edition/cabrera/2022 230 1 Copy Financial Management 1e/yu/2024 231 1 Copy Foundations Of Special And Inclusive Education/aligada-halal,et.al/2020 232 1 Copy Transformissional Values Education/2020 233 1 Copy Rural Development (administration And Planning)/ 9789350147801/ Gautam/2024 234 1 Copy Encyclopedia Of Science And Technology/chandra/ 2023/ 9781774693872 235 1 Copy Public Administration: Partnerships In Public Service/edwards/2024/9781639878246 236 1 Copy Microeconomics/mcconnell/23rd/9781266107887 237 1 Copy Education, Social Reform And Philosophical Development: Evidence From The Past, Principles For The Future/pring/2022 238 1 Copy Government Budgeting/kumar/2022/9789394137134 239 1 Copy Entrepreneurship And Innovation/kaur/9789392407918 240 1 Copy Attitude Of Moral Values/balakrishnan/2022 241 1 Copy Fieldwork Training In Social Work/parkash/2022 Busuanga Library 242 2 Copy Risk Management W/ Haccp As Applied To Safety, Security And Sanitation 2nd Edition/mylene Yeung/2025 243 2 Copy Macro Perspective Of Tourism And Hospitality 2nd Edition/mylene Yeung/2025 244 2 Copy Micro Perspective Of Tourism And Hospitality 2nd Edition/mylene Yeung/2025 245 2 Copy Philippine Culture And Tourism Geography 3rd Edition/mylene Yeung/2025 246 2 Copy Quality Service Management In Tourism And Hospitality 3rd Edition/chester Arenas/2024 247 2 Copy Tourism And Hospitality Marketing 2nd Edition/chester Arenas/2025 248 2 Copy Professional Development And Applied Ethics /chester Arenas/2022 249 2 Copy Legal Aspect In Tourism And Hospitality 2nd Edition/melinda Bascos/2024 250 2 Copy Entrepreneurship In Tourism And Hospitality /chester Arenas/2022 251 2 Copy Multicultural Diversity In Workplace 2nd Edition/mylene Yeung/2025 252 2 Copy Introduction To Meetings, Incentives Conferences And Events Management/chester Arenas/2025 253 2 Copy Applied Business Tools And Technologies 3rd Ed/james Saycip/2025 254 2 Copy Supply Chain Management In Hospitality Industry 2nd Ed/ Kyla De Castro/2024 255 2 Copy Medical And Wellness Tourism/porbile/2024 256 2 Copy Fundamentals Of Culinary Arts/santillan/2024 257 2 Copy Bread And Pastry/portman/2025 258 2 Copy Cookery Ncii/villasis/2025 259 2 Copy Human Resource Management In Hospitality And Tourism Industry/escobar/2024 260 2 Copy Trends And Issues In The Hospitality Industry/2026 261 2 Copy Ergonomics And Facilities Planning For The Hospitality Industry 2nd Ed/lolita Mendoza/2024 262 2 Copy Global Culture And Tourism Geography 3rd Edition/marie Angeles/2025 263 2 Copy Tour And Travel Management 3rd Edition/sarah-po/2025 264 2 Copy Transportation Management 2nd Edition/james Saycip/2025 265 2 Copy Fundamentals In Food Service Operations/bryan D. Baliste/2023 266 2 Copy Fundamentals In Lodging Operations 3rd Edition/arenas/baliste/2025 267 2 Copy Sustainable Tourism 3rd Edition/marie Angeles/2025 268 2 Copy Tourism Policy Planning And Development/ Dino Et. Al/2022 269 2 Copy Research In Tourism And Hospitality 2nd Edition/lolita Mendoza/2025 270 2 Copy Foreign Language (french And Japanese)/karol Aquino/2025 271 2 Copy Strategic Management W/ Tqm In Tourism And Hospitality Industry/vizconde Et. Al/2023 272 2 Copy Operations Management For Tourism And Hospitality Industry 2nd Ed/vizconde Et. Al/2025 273 2 Copy Heritage Tourism/vizconde Et. Al/2023 274 2 Copy Tour Guiding/vizconde Et. Al/2022 275 2 Copy Cruise Tourism/vizconde Et. Al/2021 276 2 Copy Food And Beverage Labor Cost Control 2nd Edition/lyndsey Velasquez/2024 277 2 Copy Bread And Pastry/karol Aquino/2022 278 2 Copy Meat And Poultry Fabrication 2nd Ed/lolita Mendoza/2024 279 2 Copy Food Processing 2nd Edition/jamille Jaravata/2024 280 2 Copy Tourism Information Management/lyndsey Velasquez/2021 281 2 Copy Culinary Nutrition/ Lolita Mendoza/2023 282 2 Copy Asian Cuisine/jam Melchor/2022 283 2 Copy Philippine Regional Cuisine/jam Melchor/2024 284 2 Copy Gastronomic Tourism/vizconde Et. Al/2021 285 2 Copy Food And Beverage Services/vizconde Et. Al/2025 286 2 Copy Housekeeping Operations 2nd Edition/vizconde Et. Al/2024 287 2 Copy Bar And Beverage Management/vizconde Et. Al/2024 288 2 Copy Room Division Cost Control/arenas/2022 289 2 Copy Menu Design And Revenue Management 2nd Edition/chester Arenas/2024 290 2 Copy Destination Management And Marketing 2nd Edition/chester Arenas/2025 291 2 Copy Quantity Food Production: A Guide For Commercial Cooking Nc Iii/entrata Et. Al/2022 292 2 Copy Banquet And Catering Management/vizconde Et. Al/2025 293 2 Copy Front Desk Operations/vizconde Et. Al/2022 294 2 Copy Tourism Product Development/vizconde/2025 295 2 Copy Recreation And Leisure Management/etrata Et. Al/2022 296 2 Copy International Cuisine/victoriano Et.al/2022 297 2 Copy Food Styling And Design/etrata Et. Al/2025 298 2 Copy Cookery/etrata Et. Al/2022 299 2 Copy Travel Writing And Photography/vizconde Et. Al/2024 300 2 Copy Crowd And Crisis Management/vizconde Et. Al/2022 301 2 Copy Environmental Conservation In Tourism/vizconde Et. Al/2022 302 2 Copy Trends And Issues In Hospitality Industry/etrata Et. Al /2022 303 2 Copy Quick Food Service Operations/etrata/2022 304 2 Copy Culinary Mathematics/santiago/2023 305 2 Copy Data Analytics In Hospitality/jaravata/2024 306 2 Copy Fundamentals Of Food Science And Technology/valle/2024 307 2 Copy Butchery And Fish Mongerie/valle/2024 308 2 Copy Garde Manger/bonfor/2024 309 2 Copy Classical French Cuisine/caridad/2024 310 2 Copy Specialty Cuisine/rabor/2024 311 2 Copy Halal Cookery/marinez/2024 312 2 Copy Gastronomy (food And Culture)/alba/2024 313 2 Copy Oenology (making Of Wine And Spirits)/antomio/2024 314 2 Copy Revenue Management/isla/2024 315 2 Copy Franchising /stevens/2024 316 2 Copy Commissary Food Service/donray/2024 317 2 Copy Accommodation Operations And Management/medalye/2024 318 2 Copy Hospitality And Tourism Facilities Management And Design/gutang/2024 319 2 Copy Agritourism/medalye/2024 320 2 Copy Tourism Property Management And Development/victoria/2024 321 2 Copy Tourism Estate And Integrated Resort Industry/manzano/2024 322 1 Copy Events Management, 2nd Ed./dela Cruz/2024 323 1 Copy Essentials Of Risk Management/banaag/2024 324 1 Copy Facilities Planning & Management, 2nd Ed./serrano/2024 325 1 Copy Front Office System And Procedures, Rev. Ed./lago,lim/2024 326 1 Copy Introduction To Research/sergote/2024 327 1 Copy Learning Research The Easy Way Rev.ed/uriarte/2024 328 1 Copy Mastering Modern Supply Chain For Tourism And Hospitality Industry/maranan,et Al./2024 329 1 Copy Principles Of Total Quality Management/pasahol Et Al./2024 330 1 Copy Productivity And Quality Management 2nd Ed./serrano/2024 331 1 Copy Spanish For Beginners, 2nd Ed./perez,ramonito/2024 332 1 Copy Strategic Management/austria, Etc/2024 333 1 Copy Strategic Management In Tourism And Hospitality Industry/buenaventura,gutierrez/2024 334 1 Copy Strategic Operations Management 2nd Ed./serrano/2024 335 1 Copy Sustanable Tourism: A Comprehensive Guide To Promoting Responsible Travel/maranan, Etc/2024 336 1 Copy The Evolving Landscape Of Strategic Management And Leadership/perida, Arcadio/2024 337 1 Copy Bar And Beverage Management-a Book Of Drinks 2nd Ed./bajao/osorno/2023 338 1 Copy Boarding House/jaileen F. Jimeno/2023 339 1 Copy Ergonomics And Facilities Planning For The Hospitality Industry /buenaventura/2023 340 1 Copy Fundamentals In Lodging Operations/sarah Monson-po/2023 341 1 Copy Fundamentals Of Lodging Operations With Housekeeping Laboratory Manual/bajao/osorno/2023 342 1 Copy Kitchen Essentials And Basic Food Preparation/remaneses, Et Al./2023 343 1 Copy Operations Management In Tourism And Hospitality/buenaventura, Et Al./2023 344 1 Copy Practicum Manual For Tourism And Hospitality Management/taoing,cabugon/2023 345 1 Copy Professional Development And Applied Ethics/cabulay/2023 346 1 Copy Quality Service Management In Tourism And Hospitality/buslon/osorno/2023 347 1 Copy Professional Conduct & Ethical Standards/lud-ayen/moyao/2023 348 1 Copy Quantity Cookery And Catering Management ( A Guide To Students,leading To Commercial Cooking Nc Iii)/prades/2023 349 1 Copy Risk Management As Applied To Safety Security And Sanitation 2nd Ed/somoray/2023 350 1 Copy Sustainable Tourism/bajao/osorno/2023 351 1 Copy Sustainable Tourism/santos/2023 352 1 Copy Applied Business Tools And Technologies In Hotel And Restaurant Management (hrm)/gonzalo, Etc/2023 353 1 Copy Foreign Language I (basic French For Hospitality Management And Tourism I)/ Tomas/2022 354 1 Copy Foreign Language Ii (basic French For Hospitality Management And Tourism I)/tomas/2022 355 1 Copy Tourism Policy Planning And Development/cruz/2022 356 1 Copy Fundamentals In Food Service Operations/yao/2022 357 1 Copy Supply Chain Management In Hospitality Industry/baluyot/2022 358 1 Copy Assessment Of Learning 1/manas/2024 359 1 Copy Charater Formation 1-patrotism And Nationalism/adra/2024 360 1 Copy Character Formation 2-leadership Making , Management And Administration /adra/2024 361 1 Copy Character Formation 1- Patriotism And Nationalism 3rd Ed./rondina/2024 362 1 Copy Character Formation 2-leadership Making , Management And Administration 3rd Ed./literal/2024 363 1 Copy Entrepreneurial Behavior Growth Mindset And Fixed Mindset/pasahol/2024 364 1 Copy Entrepreneurial Management/ybanez/2024 365 1 Copy Facilitating Student-centered Teaching & Learning/larioque,et Al./2024 366 1 Copy First Aid, Rescue And Water Safety: A Self-regulated Learning Module /dogui-is/2024 367 1 Copy Gender And Society/bacolod, Et, Al./2024 368 1 Copy Inclusive Education In Early Childhood Settings/boholona, Et Al./2024 369 1 Copy Introduction To Criminology /caballero/barican/2024 370 1 Copy Introduction To Criminology/cabrillas, Et Al/2024 371 1 Copy Introduction To Research/sergote/2024 372 1 Copy Learning Research The Easy Way Rev.ed/uriarte/2024 373 1 Copy Moral Philosophy And Ethics/bacuyag/2024 374 1 Copy (path-fit 2) Physical Activity Towards Health And Fitness Rhytmic Dance And Social Activities/punzalan,habana/2024 375 1 Copy Promoting Community Change Through Civic Welfare Training Service 2/corpuz/2021 376 1 Copy Special Education Book 1/reyes,pascual/2024 377 1 Copy The Contemporary World/mananay/2024 378 1 Copy The Teacher And The School Curriculum/gallardo/mañas/2024 379 1 Copy Theories Of Crime Causation/salamanca, Et Al/2024 380 1 Copy Therapeutic Modalities 3rd Ed./balares Et Al./2024 381 1 Copy The Teaching Profession In The 21st Century/sarandi, Babao/2024 382 1 Copy The Teaching Profession/fernando,et Al/2024 383 1 Copy Understanding Society And Culture/riodique Iii/2024 384 1 Copy Upscaling Oral Communicationskills In The 21st Century Global Space/gutierrez, Et Al/2024 385 1 Copy Microeconomics Theories And Applications/marcelo/2023 386 1 Copy "technology For Teaching And Learning 1/ronato S. Ballado Marlo D. Alvarez, Alejandro L. Giray Jr./ 2023" 387 1 Copy Code Of Ethics Of Professional Teachers/estrada/2023 388 1 Copy A Course Module For Science In Early Childhood Education/joel Bernal Faustino , Eden Joy Pastor Alata, Antonnette Pawilen/2024 389 1 Copy A Course Module For Science In Early Childhood Education 1e/faustino/2024 390 2 Copy Fundamentals Of Criminal Investigation And Intelligence/tad-awan/2024 391 1 Copy Handbook In Juvenile Deliquency And Violence Againts Women And Their Children/barican/2024 392 1 Copy Human Behavior And Victimology /depayso/2024 393 2 Copy Human Development-understanding Criminal Behavior And Victimology/togana/2024 394 1 Copy Intelligent Leadership Resilience/perida/2024 395 1 Copy Introduction To Cybercrime & Basic Digital Investigative Analysis 3rd Ed/detrane/2024 396 1 Copy Introduction To Industrial Security Concepts /depayso//2024 397 1 Copy Introduction To Industrial Security Concepts 4th Ed/bobier/2024 398 1 Copy Introduction To Philippine Government & Politics With Basic Constitutional Provisions/baes/2024 399 1 Copy Juvenile Delinquency And Juvenile Justice System 2nd Ed./detran/2024 400 1 Copy Law Enforcement Operationss And Planning With Crime Mapping/tancangco/2024 401 1 Copy Learn And Enjoy Intermediate Statisitcs The Easy Way-advanced Volume 2 Rev. Ed/uriarte/2024 402 1 Copy Learn And Enjoy Statisitcs The Easy Way-basic Volume 1 Rev. Ed/uriarte/2024 403 1 Copy Microeconomics Numerical And Computational Approach/paurom/2024 404 1 Copy Non- Institutional Corrections 3rd Ed/chavez/2024 El Nido Library 405 1 Copy Introduction To Criminology/caballero/barican/2024 406 1 Copy Introduction To Criminology / Cabrillas, Et. Al/2024 407 1 Copy Facilities Planning & Management, 2nd Ed./serrano/2024 408 1 Copy Events Management, 2nd Ed./dela Cruz/2024 409 1 Copy Concepts And Approaches In Inventory Management And Control/banaag, Et.al/2024 410 1 Copy Entrepreneurial Behavior Growth Mindset And Fixed Mindset/pasahol, Et.al/2024 411 1 Copy Essentials Of Risk Management/banaag/2024 412 1 Copy Front Office System And Procedures, Rev. Ed./lago, Lim/2024 413 1 Copy Handbook In Juvenile Deliquency And Violence Againts Women And Their Children/boholona, Et. Al/2024 414 1 Copy Moral Philosophy And Ethics/bacuyag/2024 415 1 Copy Multicultural Diversity In The Tourism Hospitality Workplace: A Comprehensive Guide For Professionals/maranan, Et.al/2024 416 1 Copy (path-fit 2) Physical Activity Towards Health And Fitness Rhytmic Dance And Social Activities/punzalan, Habana/2024 417 1 Copy Promoting Community Change Through Civic Welfare Training Service 2/briones, Et.al/2024 418 1 Copy Strategic Management In Tourism And Hospitality Industry/buenaventura,gutierrez/2024 419 1 Copy Sustanable Tourism: A Comprehensive Guide To Promoting Responsible Travel/maranan, Et.al/2024 420 1 Copy The Teaching Profession In The 21st Century/sarandi, Babao/2024 421 1 Copy Teaching And Assessment Of Grammar/manas/2024 422 1 Copy Understanding Society And Culture/riodique Iii/2024 423 1 Copy Vice And Drug Education And Control /tad-awan,et Al./2024 424 1 Copy Juvenile Delinquency And Juvenile Justice System 2nd Ed./detran/2024 425 1 Copy Introduction To Philippine Government & Politics With Basic Constitutional Provisions/baes/2024 426 1 Copy Human Development-understanding Criminal Behavior And Victimology/togana/2024 Canique Library 427 1 Copy Entrepreneurial Behavior Growth Mindset And Fixed Mindset/pasahol, Et.al/2024 428 1 Copy An Eye For Art Appreciation: Perception And Expression,2nd Ed./sonsona, Et.al/2024 429 1 Copy Gender And Society/bacolod, Et.al/2024 430 1 Copy Introduction To Philippine Government & Politics With Basic Constitutional Provisions/baes/2024 431 1 Copy The Life And Works Of Rizal/sanchez, Et.al/2024 432 1 Copy The Contemporary World//mananay, Et.al/2024 433 1 Copy Understanding Society And Culture/riodique Iii/2024 434 1 Copy Upscaling Oral Communicationskills In The 21st Century Global Space/gutierrez, Et Al/2024 435 1 Copy Organic Farming/loreto/2021 436 1 Copy Organic Fungicides/loreto/2021 437 1 Copy Organic Gardening/loreto/2021 438 1 Copy Mathematics In Modern World/reynoso, C./2024 439 1 Copy Nstp 1 Guide In Civic Welfare Training Service/lonez/2023 440 1 Copy Physical Activity Towards Health & Fitness 1 (path-fit 1) Health & Wellness, Movement Education And Exercise Program/punzalan,et Al/2023 441 1 Copy Physical Activities Towards Health And Fitness( Pathfit 2) Combative Sports & Outdoor Recreational Activities/bulatao, Et Al/2023 442 1 Copy Biological Chemistry Obe-based/chua,et.al/2023 Culion Library 443 1 Copy Understanding Society And Culture/riodique Iii/2024 444 2 Copy Upscaling Oral Communicationskills In The 21st Century Global Space/gutierrez, Et Al/2024 445 1 Copy Organic Farming/loreto/2021 446 1 Copy Organic Fungicides/loreto/2021 447 1 Copy Organic Gardening/loreto/2021 448 1 Copy Mathematics In Modern World/reynoso, C./2024 449 1 Copy Nstp 1 Guide In Civic Welfare Training Service/lonez/2023 450 1 Copy Physical Activity Towards Health & Fitness 1 (path-fit 1) Health & Wellness, Movement Education And Exercise Program/punzalan,et Al/2023 451 1 Copy Physical Activities Towards Health And Fitness( Pathfit 2) Combative Sports & Outdoor Recreational Activities/bulatao, Et Al/2023 452 1 Copy Biological Chemistry Obe-based/chua,et.al/2023 453 1 Copy Entrepreneurial Behavior Growth Mindset And Fixed Mindset/pasahol, Et.al/2024 454 1 Copy An Eye For Art Appreciation: Perception And Expression,2nd Ed./sonsona, Et.al/2024 455 1 Copy Gender And Society/bacolod, Et.al/2024 456 1 Copy Introduction To Philippine Government & Politics With Basic Constitutional Provisions/baes/2024 457 1 Copy The Life And Works Of Rizal/sanchez, Et.al/2024 458 1 Copy The Contemporary World//mananay, Et.al/2024 Rio Tuba Library 459 1 Copy Mathematics In Modern World/reynoso, C./2024 460 1 Copy Art Appreciation 2e/sanchez,et.al/2023 461 1 Copy Art Appreciation For College Students/leano/2018 462 1 Copy Ethics/mondares,r/2024 463 1 Copy Understading The Self/vazquez, I./2024 464 1 Copy Environmental Science For All/cobar, L./2022 465 1 Copy Environmental Science/calimlim/2021 466 1 Copy Nstp 1 Guide In Civic Welfare Training Service/lonez/2023 467 1 Copy Physical Activity Towards Health & Fitness 1 (path-fit 1) Health & Wellness, Movement Education And Exercise Program/punzalan,et Al/2023 468 1 Copy Physical Activities Towards Health And Fitness( Pathfit 2) Combative Sports & Outdoor Recreational Activities/bulatao, Et Al/2023 469 2 Copy Physical Activities Towards Health And Fitness Pathfit 2( Exercise-based Fitness Activities/ballecer,et Al/2023 470 2 Copy Physical Activity Towards Health And Fitness 3 (path-fit 3 )menu Of Dance/punzalan, Et Al./2023 471 2 Copy Physical Activity Towards Health And Fitness ( Path-fit 4 Sports)individual/dual And Team Sports/bulatao, Et Al/2023
Closing Date7 Feb 2025
Tender AmountPHP 430 K (USD 7.3 K)

Department Of Education Division Of Tangub City Tender

Solar Installation and Products...+1Electrical and Electronics
Philippines
Details: Description 1. The Department Of Education – Division Of Tangub City, Through The General Appropriations Act 2024 Intends To Apply The Sum Of Three Million Nine Hundred Seventy-eight Thousand One Hundred Six Pesos (php 3,978,106.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Second Procurement Of Learning Tools And Equipment For Technical Vocational Livelihood To Deped-public Schools With Identification Number Tvl - 2025 – Rx – Tangub City – 030.a. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Quantity Unit Item Description Abc Lot 1. Lorenzo Tan National High School (caregiving Nc Ii)- Php 400,403.00 5 Piece Airpot 1.type: Water Heater 2. Outer Material: Hard Plastic, (pp) Polypropylene, Heat Resistant 3.cavity Material: Stainless Steel 4. Capacity: 2.5 Liters 5.voltage: 220/240/volts 6.ac 50/60 Hz. Power In Watts: 500 To 800 Watts 7.comes With English Manual That Contains: Users Guide, List Of Parts, Maintenance Guide, Safety Guide 8. The Item Must Be Branded And Good Quality. 10 Piece Apron 1.type: Bib Apron 2. Material: Polyester-cotton Fabric 3.length: 20 To 40 Inches (minimum) 4. With 2 To 3 Bottom Pockets; 5.color: Any 6.the Item Must Be Of Good Quality 2 Piece Bath Tub, Baby 1. Material: Hard/sturdy Plastic, (pp) Polypropylene 2. Color: Any 3.dimension: (l X W X H) 670 To 700 Mm X 400 To 420 Mm X 160 To 190 Mm (minimum) 4. Thickness: 3 Mm To 6 Mm (minimum) 5.color: The Item Must Be Of Good Quality 10 Piece Baby Blanket 1. Type: Blanket 2. Material: 100% Cotton 3.color: White 4. Dimension: (l Xw) 38 To 42 Inches X 28 To 32 Inches (minimum) 5. Washable 6. The Item Must Be Of Good Quality 20 Piece Basin (small) 1.material: Hard Plastic, (pp) Polypropylene 2. Color: Any 3.dimension: 280 - 320 Mm Diameter X 80 - 120 Mm Higher (mimimum) 4. Thickness: 2 Mm To 4 Mm (minimum) 5. The Item Must Be Of Good Quality 20 Piece Bath-towel, Towellete 1. Type: Bath Towel 2. Material: 100% Cotton 3.color: White 4. Dimension: ( L X W ) 120 - 125 Cm X 60 - 65 Cm (minimum) 5.washable 6.the Item Must Be Of Good Quality 5 Piece Bedpan 1.material: Hard Plastic, (ps) Polystyrene 2. Color: Any Color 3.dimension: ( L X W X H) 22 - 26 Cm X 27 - 32 Cm X 7 - 12 Cm (minimum) Approximate 4. Capacity: 1 Liter (minimum) 5.thickness: 2 To 5 Mm 6.saddle-shaped And Lightweight 7. The Item Must Be Of Good Quality 10 Piece Blanket 1. Type: Blanket 2. Material: Cotton 3.color: White 4. Dimension: (l X W) 80 - 90 Inches X 54 -64 Inches Approximate 5. Washable 6. The Item Must Be Of Good Quality 3 Piece Bottle Sterilizer, Electric 1. Type: Electric Steam Sterilizer 2. Material: Hard Plastic (p E) Polyethylene Or Its Equavalent 3.color: Any Color 4. Capacity: 6 Bottles (minimum) 5.sterilizes Bottle And Accessories By Steam 6. With Automatic Power Shut-off Function 7. Dimensions: 8. Power Supply: 220 V-240v Ac, 50/60 Hz. 9. The Item Must Be Of Good Quality 5 Piece Bread Toaster 1. Type: Electric Bread Toaster 2. Dimensions ( W X D X H): 25 - 30 Cm X 15 -20 Cm X 18 - 22 Cm (minimum) Approximate 3. Capacity: 2 Slices 4. Power Supply: 220v-240v Ac, 50/60 Hz. 5. 400 To 600 W (minimum) 6. The Item Must Be Of Good Quality 10 Piece Burping Cloth 1. Type: Burping Cloth 2. Material: 100% Cotton 3. Color: Any Color 4. Dimension: Length: 17 -19 Cm Width: 14 -16 Cm (minimum) 5.washable 6. The Item Must Be Of Good Quality 10 Piece Cane 1.type: Adjustable Offset-walking Cane 2. Material: Aluminum 3.tip Size: 18 4. Height Adjustment: 31 Inches To 39 Inches (with 1 Inch. Increment) 5.weight Capacity: 200 - 250 Lbs. (minimum) 6.with Rubber Handle; With Push-botton Height Adjustment 7. The Item Must Be Of Good Quality 5 Piece Carpet 4ft. X 8 Ft 1.material: Polyster 2. Color: Any Patterned Color 3.dimension:48 Inches X 96 Inches (minimum) 4.the Item Must Be Of Good Quality 5 Set China Ware 1.material: Porcelain 2. Fit To Be Used In Ovens And Microwaves 3.specific Dimensions: Dinner Plate Diameter: 10 Inches (minimum) 4. Salad Plate Diameter: 7 Inches (minimum) 5.bowl Diameter: 5 Inches (minimum) 6.mug: 12 Oz. (minimum) 7. The Item Must Be Of Good Quality 8. Set Includes: 1 Piece Dinner Plate, 1 Set Salad Plate, 1 Piece Bowl, 1 Piece Mug 10 Piece Clothes Brush 1. Type: Rectangular Clothes Brush 2. Handle Material: Wood 3. Bristle Material: Plastic Bristle 4. Color: Any Color 5.overall Dimension: ( L X W X H) 140 -160 Mm X 45- 60 Mm X 20 -30 Mm (minimum) 6. The Item Must Be Of Good Quality 10 Piece Clothes Hamper 1. Type: Square Hamper 2. Material: Polyester 3. Color: Any Color 5. Dimension: ( L X W X H) 32 To 34 Cm X 36 To 38 Cm X 56 To 58 Cm (minimum) 5. The Item Must Be Of Good Quality 2 Piece Clothes Rack 1.type: Single-pole Clothes Rack 2. Material: Stainless Steel 3. Dimension: ( L X W X H) 30 To 32 Inches X 14 To 38 Inches X 62 To 64 Inches (minimum) 4. Comes With 4 Caster Wheels 5. The Item Must Be Of Good Quality 3 Piece Comforter 1.type:comforter 2. Material: Polyester 3.color: Any Color 4. Dimension: ( L X W) 84 To 88 Inches X 62 To 65 Inches (minimum) 5.thickness: 20-30 Mm (minimum) 6.washable 7. The Item Must Be Of Good Quality 3 Piece Commode 1.type: Foldable Commode 2. Durable Plastic Snap- On Seat And Lid Withouot Pushing Buttons 3. Blue Powder-coated Steel-welded Construction 4. Plastic Arms For Added Comfort 5.comes Complete With 12 Qt. Commode Bucket With Carry Handle, Cover And Splash Shield 6. Specifications: Width 18 Inches Between Arms/ 22.5 Inches Outside Approximate 7. Set Dimensions: W 32 -36 Cm X D 35 -40 Cm, Height 38 -54 Cm Approximate 8. Weight 13 Lbs., Weitgh Limit 350 Lbs. 9. The Item Must Be Of Good Quality 5 Set Cooking Utensils 1. Material: Stainless Steel 2. The Set Is Comprised Of Ff:; 1 Pc. -16 X 9.5 Cm Sauce Pan With Glass Lid (minimum) 3. 1 Pc. - 16 X 95 Cm Casserole With One Glass Lid, (minimum) 4. 1 Pc. - 18 X 10.5 Cm Casserole With Glass Lid, (minimum) 5.1 Pc. - 20 X 11. 5 Cm Casserole With Glass Lid, (minimum) 6. The Item Must Be Of Good Quality 2 Piece Crutches, Adjustable 1.type: Adjustable Crutches 2. Set Includes: 3 Pcs./set 3.material: Aluminum Powder-coated 4. Color: Any Color 5.weight Capacity: 300 Lbs. (minimum) 6. Dimensions: Youth Size 7. User Heights: 4 Ft. 6 Inches To 5 Ft. 2 Inches 8. Underarm Height: 37 Inches To 46 Inches 9. Adult Size: User Heights: 5 Ft. 2 Inches To Ft. 10 Inches 10. Underam Heights: 45 Inches To 53 Inches 11. Tall Adult Size: User Heights: 5 To 10 Inches 12. Underam Height: 53 Inches To 61 Inches 13. The Item Must Be Of Good Quality 10 Piece Cutlery 1.material: Stainless Steel 2. 20 Pieces Set For 4 3. 4 Dinner Knives 4. 4 Dinner Forks 5. 4 Dinner Spoons 6. 4 Salad Forks 7. 4 Tea Spoons 8. The Item Must Be Of Good Quality 10 Piece Cutting Board, Plastic 1. Material: Polyethylene Plastic 2. Color: Any Color 3. Dimension: ( L X W X H) 240 - 260 Mm X 140 - 160 Mm X 10 - 15 Mm (minimum) 4. Reversible Cutting Surface 5. The Item Must Be Of Good Quality 10 Piece Digital Thermometer, 32 C-42.9 C (90.0f-109.9f 1. Case Material: Hard Plastic (pe) Polyethylene 2. Color: Any Color 3. Range: 32 C - 42.9 C (90.0f-109.9f) 4. Accuracy: + 0.1c 35.5c-42.0c(+ 0.2 F 95.9f-107.6f) 5. Battery Operated 6.memory: Last Measuring Reading 7.alarm: Approx. 10 Seconds Sound Signal When Peak Temperature Reached. 8. The Item Must Be Of Good Quality 2 Piece Dressing Trolley 1.material: Shelves: Powder-coated Steel Sheet 2. Dimensions: ( W X D X H) 48 - 50 Cm X 48 - 50 Cm X 83 - 85 Cm (minimum) 3.number Of Shelves: 2 4. With Four Revolving Castors, Two Lockable 5. The Item Must Be Of Good Quality 10 Piece Electric Knife 1. Type: Electric Knife 2. Material: Stainless Steel And Hard Plastic, (pe) Polyethylene 3. Power Supply: 220/240 Volts, Ac 50/60 Hz. 4. Dimensions: 4.25 X 2.75 X 11.88 Inches (minimum) 5.comes With Touch Button Control, Safety Lock And English User & 39;s Manual 6. Comes With English Manual That Contains: Users Guide, List Of Parts, Maintenance Guide, 7. The Item Must Be Of Good Quality 10 Piece Face Towel/towellete 1. Type: Face Towel 2. Material: 100% Cotton 3. Color: White 4. Dimension: ( L X W ) 28- 32 Cm X 28 -32 Cm (minimum) 5. Washable 6. The Item Must Be Of Good Quality 10 Piece Feeding Bottle Brush 1. Bristle Material: Nylon 2. Color: Any Color 3. Handle Material: Hard Plastic, (ps) Polystyrene 4. Total Length: 280 -320 Mm (minimum) 5. Fit With The Standard Feeding Bottle For The Baby 6.comes With Nipple Brush 7. Washable 8. The Item Must Be Of Good Quality 5 Set Feeding Utensils (child) 1.material: Hard Plastic, (ps) Polystyrene 2. Sets Includes: 6 Pcs./set 3. 1 Pc Knife 4. 1 Pc- Plate 5. 1 Pc. -bowl 6. 1 Pc. - Cup 7. 1 Pc. -fork 8.1 Pc. - Spoon 9. Color: Any 10. The Item Must Be Of Good Quality 7 Set First Aid Kit Type: Emergency Case; Contents: First Aid Quick Reference Guide, 1 Pc; Sterize Gauge Swab (4x 4 X 12 Ply) 100 Pcs/pack, 1 Pack; Adhesive Strips/band-aid, 50 Pcs/pack, 2 Packs; Gloves, Disposable, Medium Size, 2 Pairs; Hypo Allergenic Adhesive Tape, 5 Cm X 5 Cm, 2 Rolls; Triangular Bandage/arm Sling, Min 90 Cm X 90 Cm X 120 Cm, 2 Pcs; Safety Pins, 1 1/4 Inches, (12 Pcs), 1 3/4 Inches (12 Pcs); Stainless Steel Bandage Scissors, 2 Pcs; Betadine, 60ml, 2 -3 Years Expiration, 2 Bottles; Dust Mask, 2 Pcs; Hand Towels Or Face Towels, White Color, 6 Pcs; Gauze Bandage, Minimum 5 Cm X 4cm, 2 Rolls; Antiseptic Handwash/germicidal Soap, 60 Gms, 2 Pcs; Torniquet, 2 Pcs; Spirit Of Ammonia, 30ml, 2-3 Years Expiration, 1 Bottle; Burn Cream Ointment, 20g To 30g, 2-3 Years Expiration, 1 Tube; Medical Tweezers Min. 8 Cm, Plastic, 2 Pcs; Plastic Bags, Resealable, Minimum Of 24 Pcs, 100mm X 180mm, 24 Pcs, 150mm X 230mm; Cotton Balls, 50 Balls In A Sealed Package, 2 Packs; Hot And Cold Pack, Reusable, 1 Pack; Water Resistant And Sturdy Case W/ Handle That Can Accomodate All The Listed Items. 20 Piece Flat Sheet 1.type:bed Sheet 2. Material: 100% Cotton 3. Color: White 4. Dimension: Width - 137 - 145 Cm Length - 180 -200 Cm (minimum) 5. Washable 6. The Item Must Be Of Good Quality 10 Piece Garbage Bin Type: Swivel Lid Garbage Bin Body Shape: Round Material: Hard Plastic, Polypropylene Dimension: 4 Gallons ( Minimum) Removable Dome Shape Lid With Spring Return Swivel Preferably With Packing Case Color: Any Color Smooth And No Rough Surfaces 20 Box Gloves, Rubber (15 Mils) Medium Size (#8) Super Nitrile, Flocklined Interior (acid/solvent Resistant) Individually Packed For Hand Protection 10 Box Gloves, Surgical (disposable) 1.material: Latex 2. Color: White 3. Thickness: .09 Mm (minimum) 4. Disposable And Sterile 5. The Item Must Be Of Good Quality 20 Piece Gown (hospital) 1.type:unisex Hospital Gown 2. Material: Polyester- Cotton 3. Color: Any Color 4. Size: One Size Fits All 5. Comes With Overlap Back Closure 6. The Item Must Be Of Good Quality 5 Set Grooming Kit (hairbrush Comb, Nail Cutter, Nail Brush) 1. Set Includes: 6 Pcs./ Set (minimum) 2. Materials: Stainless Steel And Hard Plastic 3. 2 Nail Clippers/ Trimmers Of Different Sizes 4.1 Multipurpose Scissors 5. 1 Ear Pick 6. 1 Tweezer 7. 1 Comb 8. The Item Must Be Of Good Quality 10 Piece Hand Towel 1. Type: Hand Towel 2. Material: 100% Cotton 3. Color: Any Color 4. Dimension: ( L X W) 65 -75 Cm X 32 -42 Cm (minimum) 5. Washable 6. The Item Must Be Of Good Quality 3 Piece High Chair/booster Seat/ Portable Seat 1. Material: Foldable Powder Coated Steel Frame Or Its Equavalent 2. Phone Type: Corded 3. Polyester Harness, Seat/back Cushion 4. Overall Dimensions: ( L X W) 65 -75 Cm X 50 -60 Cm X 90 - 102 Cm (minimum) 5. Capacity: 40 Lbs. (minimum) 6. With 3-position Seat Recline 7. The Item Must Be Of Good Quality 10 Piece Hot Water Bag 1. Material: Rubber Or Its Equavalent 2. Color: Any Color 3. Overall Dimension: (lxw) 200- 300 Mm X 150 -200 Mm (minimum) 4. Leak-proof And Washable 5. The Item Must Be Of Good Quality 10 Piece Kettle 1. Material: Heat-resistant Hard Plastic 2. Capacity: 1- 1.5 Liters (minimum) 3. Height: 25-35 Cm (minimum) Approx 4. Voltage: 220/240 Volts, Ac 50/60 Hz 5. Power In Watts: 1000 To 1500 Watts 6.comes With Automatic Shut-off Feature And Permanent Water Level Indicator 7. Pitcher-type With Pouring. 8. Comes With English Manual That Contains: Users Guide, List Of Parts, Maintenance Guide, 9. The Item Must Be Of Good Quality 10 Set Measuring Cups .. 1/4, 13, 1/2 1 Cup Set 1. Materials: Stainless Steel 2. Set Includes: 4 Pcs./set; 3. 1 Pc. - 1/4 Cup (60 Ml) 4. 1 Pc- -1/3 Cup (80ml) 5. 1 Pc.- 1/2 Cup (125 Ml) 6. 1 Pc. - 1 Cup ( 250 Ml) 7. Thickness: .5 Mm To 1 Mm (minimum) 8. The Item Must Be Of Good Quality 10 Piece Medical Tray 1. Type: Tray 2. Material: Stainless Steel 3. Overall Dimension: (lxw X D) 300- 350 Mm X 200 -250 Mm X 12 - 19 Mm (minimum) 4. Thickness: .7 To 1 Mm (minimum) 5. The Item Must Be Of Good Quality 2 Set Mixing Bowl, Stainless, 6-piece Set 1. Material: Stainless Steel 2. Quantity Of Set: 6 Pcs./set 3. Dimension: 3/4 Qt., 1.5 Qt., 3 Qt., 4 Qt., 5 Qt., 8 Qt., 4. The Item Must Be Of Good Quality 10 Piece Pail, Plastic, 10 Liters 1. Material: Polyethylene Plastic 2. Dimension: 25-30 Cm Diameter X 23-27 Cm Depth (minimum) 3. Color: Any Color 4. Chromed Finished Handle 5. Capacity: 10 Liters (minimum) 6. Material Must Be Non-toxic 7. The Item Must Be Of Good Quality 10 Piece Pans 1. Type: Frying Pan 2. Material: Stainless Steel 3. Handle: With Hard Plastic Heat Insulation 4. Tempered Glass Lid With Steam Hole 5. Size 23 -26 Cm With Lid 6. The Item Must Be Of Good Quality 10 Piece Peeler 1. Type: Peeler 2. Blade Material: Stainless Steel 3. Handle Material: Stainless Steel 4. Overall Dimensions: 18 X 8 Cm (minimum) 5. Comes With Self-locking 6. The Item Must Be Of Good Quality 10 Piece Pick Up Forcep 1. Type: Curved Forceps 2. Material: Stainless Steel 3. Overall Length: 100-130 Mm (minimum) 4. Comes With Self-locking 5. The Item Must Be Of Good Quality 10 Piece Pillow 1. Material: Cotton 2. Color: Any Color 3. Dimensions: ( L X W) 50 - 56 Cm X 75 - 180 Cm (minimum) 4. With 4 Inches Hems 5. Washable 6. The Item Must Be Of Good Quality 20 Piece Pillow Case 1. Material: Cotton 2. Color: Any Color 3. Dimensions: ( L X W) 50 - 56 Cm X 75 - 180 Cm (minimum) 4. With 4 Inches Hems 5. Washable 6. The Item Must Be Of Good Quality 10 Piece Portable Mixer 1. Type: Portable Mixer 2. Material: Stainless Steel, Clear Acrylic 3. Capacity: 16-18 Oz. (minimum) 4. Size: 170 - 220 Mm X 75- 100 Mm 5. Requires 2 Aaa Batteries 6. Power In Watts: 250 To 300 Watts 7. The Item Must Be Of Good Quality 10 Piece Potato Masher 1. Type: Portable Masher 2. Material: Stainless Steel And Hard Plastic 3. Mesh Head Diameter: 70-90 Mm (minimum) 4. Overall Length: 250 - 270 Mm (minimum) 5. Handle Length: 120-140 Mm (minimum) 6. Washable 7. The Item Must Be Of Good Quality 5 Set Pots 1. Type: Cooking Pot 2. Material: Stainless Steel 3. Set Includes: 4 Pcs./set 4. 1 X Pot With Lid 5. 1 X Pan With Lid 6. 1 X Strainer 7. 1 X Egg Streamer 8. Size: (l X W X H) 40 To 42 Cm X 12 To 14 Cm X 26 To 28 Cm 9. The Item Must Be Of Good Quality 5 Piece Skillet 1. The Item Shall Have The Following Specifications. Material Including Handle: Cast Iron 2. Color: Any Color 3. Dimension ( Dia. X Depth): 250 - 320 Mm X 50 - 70 Mm (minimum) 4. Handle Casted With The Body And Having Plastic Or Rubber Heat Insulator 5. Body Thickness: 1.5 - 3 Mm (minimum) 6. Washable 7. The Item Must Be Branded And Have Good Quality. 5 Piece Sphygmomanometer 1. Type: Aneroid 2. Material: Nylon Cuff And Inflation Bag, Die - Cast Zinc Manometer 3. Package Inlcluded: 1 X Aneroid Sphygmomanometer. 4. Size: ( L X W X H Cm) = 18 To 20 Cm X 11 To 13 Cm X 11 13 Cm 5. Nylon Zippered Carrying Case 6. Capacity: 0 To 300 Mm Hg 7. The Item Must Have Good Quality. 5 Piece Stethoscope 1. Type: Dual Head Stethoscope 2. Material: Stainless Steel Chestpiece And Eartubes 3. Reinforced Pvc Tubing 4. Soft Pvc Eartips 5. Color: Any Color 6. Bell Diameter: 18-25 Mm Approx. 7. Diaphragm Diameter: 25-50 Mm Approx. 8. Overall Length: 66-75 Cm (minimum) 9. The Item Must Be Of Good Quality 5 Piece Urinal 1. Type: Unisex Portable Urinal 2. Material: Hard Plastic, (pp) Polypropylene 3. Color: Any Color 4. Total Capacity: 28 Oz. Minimum 5. Dimension: ( L X W X H) 270 To 290 Mm X 145 To 160 Mm X 70 To 80 Mm ( Minimum) 6. Thickness: 1 Mm To 3 Mm (minimum) 7. The Item Must Have Good Quality. 5 Piece Vacuum Cleaner 1. Material: Plastic (pp) Polypropylene Or Its Equavalent 2. Color: Any Color 3. Suction Power: 18 To 22 Kpa (minimum) 4. Tank Capacity: 24 Liters (minimum) 5. Vacuum Hose Length: 6 To 8 Ft. (minimum) 6. Power Supply: 220 V - 240 Ac , 50/60 Hz. 7. With Accesories: Extension Wand, Utility Nozzle, Standard Paper Filter 8. Comes With English Manual That Contains: Users Guide, List Of Parts, Maintenance Guide, Safety Guide 9. The Item Must Be Branded And Good Quality 3 Piece Wheel Chair 1. Type: Foldable Wheel Chair 2. Overall Dimensions: ( L X W X H) 40 - 44 Inches X 26 - 30 Inches X 34 - 38 Inches ( Minimum) 3. Folded Dimensions: ( L X W X H ) 40 To 44 Inches X 10 To 14 Inches X 34 To 38 Inches (minimum) 4. Capacity: 350 Lbs. (minimum) 5. With Padded Arm Rests; With Push-to-lock Wheel Brakes 6. The Item Must Be Of Good Quality Lot 2. Sta. Maria National High School (hairdressing Nc Ii)- Php 323,170.00 5 Pcs. Bowl, Mixing, Plastic With 10.5 Cm X 6cm 2 Pcs. Bowl, Shampoo, Stainless Steel Frame, Bowl Dimensions: 19 Inch X 20 Inch X 10 Inch With Hose Attachment Of 7 Ft. 5 Box Box, Hairpin, Metal With 3.5 X 4.5 X 0.5 Inches(100 Pcs Per Box) 5 Pcs. Brush, Applicator, Plastic With 70mm X 80mm 5 Pcs. Brush, Hair, Plastic Bristle And Wooden Handle, Width - 2 Inches 10 Pcs. Cap, Frosting, With Hook, Silicone With 31cm X 22cm,rounded Metal Hook 10 Pcs. Cap, Heating, Waterproof, Cordless With 21-24 Inches 10 Pcs. Cape, Polyester With 125 Cm X 140 Cm 5 Pcs. Chair,high, Metal Painted With Anti Rust With 15 Inches X 33 Inches, Synthetic Leather Seat 5 Pcs. Chair, Hydraulic, Metal Base With 59 Cm X 54 Cm X 51-78cm, 180kg, 360' Rotation 10 Pcs. Clamp, Plastic, Length:9.5cm, Thickness:10mm 10 Pcs. Clamp, Duck Bill, Metal, Length: 11 Cm, Elasticity Stainless Steel Spring 5 Pcs. Clipper, Hair, Body Material: Hard Plastic, Blade Material: Carbon Steel, 6 Watts 10 Pcs. Comb, Afro, Plastic, Length: 7 Inches, Width: 3.25 Inches, Number Of Teeth: 12 Teeth, Teeth Height: 2.5 Inches 10 Pcs. Comb, All Purpose, Plastic, 18 Cm Long , Has Both Fine And Medium Teeth Position On One Side Only, Height Of The Teeth: 2 Cm 10 Pcs. Comb, Haircutting, Hard Plastic, Length Including The Handle:180mm, Width: 30mm With Detachable Steel Blades And Blade Holder 10 Pcs. Comb, Large Toothed, Plastic, Size:15 Cm, Number Of Teeth: 10 Teeth, Gap Between Comb's Teeth: 0.4 To 0.5 Cm , Teeth Size: 0.3 Cm X 4cm 10 Pcs. Comb, Tail, Plastic, Size : 8 Inches X 1 Inches, Tail Length: 4 Inches Tooth Length: 3/4 Inch 10 Pcs. Comb, Teasing, Plastic,1st Row: Large Teeth 25 Mm Long, 2nd Row: Small Teeth 19 Mm, Over-all Size: 20cm X 3.8 Cm 5 Pcs. Comb, Wide Tooth, Plastic, Size:15 Cm, Number Of Teeth:10 Teeth, Gap Between Comb's Teeth:0.4 To 0.5 Cm, Teeth Size: 0.3cm X 4cm 8 Pcs. Crimpers, 25 Watts, Size:38 Cm X 15.5 Cm X 9 Cm, Maximum Temp.: 200 Degrees Centigrade, Rated Voltage:10 -230volts Ac 5 Pcs. Curling Iron, Ceramic, 65watts, 210-240volts Ac, Barrel Size: 1 Inch, Adjustable Heat Setting Of 200 Degrees Centigrade, Swivel Cord Up To 360 Degree 5 Pcs. Drip Pan, Hard Plastic, Size:17.5 X 25.8 X 1 Inches, Thickness: 1/8 Inch, Shallow Rectangular Type 5 Pcs. Dryer, Hair, 1000w, Rated Voltage: 220vac, 18.5cm X 16cm X 6.5cm With Plastic Handle Design 10 Box Gloves, Disposable, Size: 25cm X 23cm, 100 Pcs Per Box 5 Pouch Gloves, Rubber, Medium, Thickness: 4 Mil, Acid Resistant 5 Pouch Gown, Smock, Polyester, Sizes: Small (50inches X 56inches);medium (52inches X 58inches); Large (54 Inches X 60inches) 10 Pouch Hairclips, Metal, Size:67mm X 19mm 10 Pack Hairnet, Invisible, Nylon, Size: 55mm, Stretchable, Color: Black 10 Pc Headband, 6 Inches, Woven Crochet Tube 10 Pc Headband, Flannel, Cloth, Size : 45 Cm, Width: 8 Cm 6 Pc Infrared Iron, Ionic Ceramic Tourmaline-infused Plates And Abs Plastic Body, Power: 70 Watts, Power Rating: 220-240 Volts Ac; Over-all Size: 24 Cm, Heating Plate 50 Mm, Heating Time: Within 30 Seconds;variable Heat Settings: From 250 To 450 Degrees Fahrenheit 10 Pc Mirror, Hand, Plastic, Size 15 Cm Diameter, Frame Thickness: 6.5mm, Over-all Length With The Handle: 20 Cm 3 Pc Mirror, Modular, Plain Mirror, Mirror Material: Glass, Frame Material: Aluminum (cut To Fit), Dimensions: 75 Cm X 65 Cm, Mirror Thickness: 6mm 10 Pc Prong Clip, Double, Steel, Size: 45 Mm 10 Pc Prong Clip, Single,steel, Size: 55 Mm 10 Pc Razor, Straight, High Carbon Steel, Foldable Straight Razor, Replaceable Blade; Dimensions: 14 Cm X 2 Cm When Folded; Double-edged Razor Blades 3 Dz Roller Pins, Metal, Size: 60mm Long, Quantity By Dozen(12 Pieces) 10 Pc Rollers, Jumbo, Plastic 44mm In Diameter X 64mm 10 Pc Rollers, Large Sized, Plastic, Size: 40mm Diameter X 60mm Long 10 Pc Rollers, Medium Sized, Plastic; Diameter: 38 Mm ,length: 58mm 4 Pc Scissor, Cutting, Stainless Steel,length: 17cm,blade Width 10 Cm 4 Pc Scissor, Thinning, High Carbon Steel, Blade Length 6cm, Style: Right Handed Scissor, Length: 17cm 5 Pc Scoop, Plastic, Capacity:1/2 Cup, Rounded Edges With Handle Thickness: 1.5 Mm 5 Pc Shower Cap, Plastic, Size: One Size Fits All Or 30cm 5 Pc Spatula, Plastic, Dimension: 7.5 Cm X 1.5 Cm 5 Pc Spray Gun, Transparent Plastic, Capacity: 300ml, Dimension: Bottom Is 7 Cm And The Height Is 17cm 3 Pc Steamer, Hair, 450 Watts, 220 Volts/50-60hz, Hood Material: Polycarbonate, Hood 30 Cm Diameter Opening X 25 Cm, Timer Setting Is Up To 60 Minutes, 32 Ounce Water Reservoir, Adjustable Height 100- 150cm 30 Pcs. Stool, Metal, Electroplated, Load Capacity: 150kg, Design: Swivel Stool With Backrest With Hydraulic Lift To Adjust Height Freely Lot 3. Sta. Maria National High School (wellness Massage Nc Ii)-php 198,338.00 5 Pcs. Dummy, Anatomical, Plastic, 32" Tall, 27 Removable Parts That Are Held On By Metal Screws, Posts, And Hooks, Brain (2parts), Lungs (2 Parts), Heart (2 Parts, Liver, Intestines, Stomach, Base Is 13" X 9" (removable), Weighs 12 Lbs. 5 Pcs. Massage Bed/table, Hard Wood With Steel Bracings, Hardwood Frame, Marine, Plywood Deck; Color: Black, Dimensions: W:75 Cm X L:183 Cm X H: (adjustable) Height: Adjustable From 24 In. - 33in., Leg Thickness - 35mm, Cushion System: High Density Foam (7.5 Cm / 2.95") With Pu Leather Cover (1mm Thick), Weight Capacity: 250 Kg(minimum), Gross Weight: 21 Kg 2 Pcs. Massage Chair, Padded With 3" Thick, High-density, Small-cell Foam, Size: 14"-diameter Seat But Without Back And Arm Rest, With Metal Post And Hard Plastic Star, Pneumatic Spring Will Effortlessly Adjust The Height From 18" To 24" With The Pull Of A Lever, Five Heavy-duty, Smooth-rolling Wheels, Load Capacity: 265 Lbs / 120 Kg (maximum), Smooth Surface And No Sharp Edges 6 Pcs. Sphygmomanometer, 33 To 42 Cm Arm Diameters, Accuracy: ±3mm Hg;measurement Range : 0mm Hg To 300mm Hg; Smallest Scale: 1mm Hg Index And Range Markings On The Dial For Clear Readings, Nylon Cuff Is Durable And Stain Resistant With A Velcro Closure 6 Pcs. Stethoscope, Stainless Steel Double Chest Piece, Color: Black, Tubing Description: Y-tube Pvc, Uses Extra Soft Replaceable And Pivotable Ear Tips, The Binaural Is Chromium-plated, Chest-piece Diameter: 44 Mm And Non-chill Rim, Overall Length: 29" /74 Cm 6 Pcs. Talking Sphygmomanometer, Nylon Cuff Sizes: 33 To 42 Cm Arm Dia, Dimensions: 98mm*126mm*60mm, Measurement Range : 0mm Hg To 300mm Hg; Smallest Scale: 1mm Hg, Weight: 450g , Range: 20~280mmhg(0.4kpa-37.3kpa), Pressure Accuracy: ±3mmhg(±0.4kpa), Pulse Measurement Range: 40 ~199 Beats /min, Voltage: 4*aaa Alkaline Batteries 25 Pcs. Talking Thermometer, Hard Plastic, Sensing Unit: Thermistor, Measurement Range: 32 C - 42 C (89.6f-107.6f), Measurement Accuracy: ± 0.1c 32c-42.0c (± 0.2 F 89.6.9f-107.6f), Power Supply: 1.5v Dc, Lr41 Alkaline-magnesium Button Battery Real Voice, Temperature Display: 3-digit, +deg C (deg F) Display In 0.1 Degree Increment, Dimension Approx.: 2.0 (w) X 4.4 (h) X 1.2 (d) Inches / 51 (w) X 110 (h) X 30 (d) Mms 26 Pcs. Thermometer, Digital, Hard Plastic, Sensing Unit: Thermistor, Measurement Range: 32 C - 42 C (89.6f-107.6f), Measurement Accuracy: ± 0.1c 32c-42.0c (± 0.2 F 89.6.9f-107.6f) Power Supply: 1.5v Dc, 1 Lr41 Alkaline-magnesium Button Battery , Power Consumption: 0.1mw, Temperature Display: 3-digit, +deg C (deg F) Display In 0.1 Degree Increment, External Size (mm): 19.4(w) × 132.5 (l) × 10.0(d) 10 Pcs. White Board, White Formica Laminated, Board Size: Rectangular 1800mm W X 1000 To 1200mm H, Board Edges Secured With Aluminum Clip Edging 17 Mm Wih Plastic Corner Caps, The Stand And Frame Are Constructed With Aluminum Or Powder Coated Steel 25mm Square Tube , Sturdy, No Wobble With 4 Lockable Hard Plastic Caster Wheels, Height From Floor: 210 To 214cm Lot 4. Sumirap National High School And Tangub City National High School (bpp Nc Ii)-php 519,702.00 10 Set Air Compressor With Airbrush Cake Decorating Set(airbrush Gravity Feed Dual Action Airbrush Compressor Kit 0.2/0.3/0.5mm Needle Air Brush For Cake Decorating Painting. Material: Aluminum + Copper Type: Single Cylinder Piston Compressor Power: 1/5 Hp Plug Type: Eu Voltage: 220-240v/50hz Speed: 1450 Rpm Air Volume Per Minute/liter: 23l/min Maximum Pressure: 7bar (100psi) Working Pressure Of Spray Gun: 15-50psi Low Noise: ≤50db Accessories: Pressure Gauge, Pressure Gauge, Air Filter Automatic Stop, Starts At 2.8 Bar, Stops At 4 Bar (special Pressures Available) Connection: With Connection G 1/8" Bsp Cable: Approx. 1.8m / 6ft) 40 Pc Egg Beater(stainless Steel Semi-automatic Mixer/manual Whisk Egg Beater Kitchen Cooking Tool) 40 Set Board, Chopping ,6 Color( Type: Food Grade Body Shape: Rectangular Material: Plastic (polypropylene), Food Grade Board Size: Length: 38 Cm (minimum) Width: 30 Cm (minimum) Thickness: 1.27 Cm (minimum) Color-coded For Use With Different Types Of Food, Blue, Red, Yellow, Green, Brown And White, Preferably Packed In Set Comes With No Sharp Edges And With Hole For Storage Purposes) 10 Pc Double Boiler (material: Stainless Steel Thickness: 1/16 Inch (1.5 Mm) (minimum) Lid Material: Glass Rivetedhandle On Both Side Diameter: 9 1/2 Inches (minimum) Total Height: 9.4 Inches (minimum) Inset Bottom Diameter: 9 Inches (minimum) Inset Top Diameter: 9 Inches (minimum) Capacity: 2 Liters (minimum) Must Be A Set Which Includes One (1) Saucepan, One (1) Boiler, And One (1) Lid With Stainless Steel Handle And Smooth Surfaces With No Sharp Edges) 80 Set Bowl, Mixing Set Stainless (premium Stainless Steel Mixing Bowls Bowl Sizes Are: 5 Qt, 4 Qt, 3qt, 1.5qt, And ¾ Qt And They Each Fit Perfectly Within One Another) 70 Set Cake Pan, Round, Size: 4''x3'' (non-stick Aluminum Alloy Cake Round Pan) 30 Set Cake Stand, With Tier (type: Cake Stand With Tier, Food Grade Body Shape: Circular With 3 Tier Material: Hard Plastic, Polypropylene, 4 Mm Thick The Tier Consists Of The Following Sizes: Tier 1: 18 Cm Diameter (minimum) Tier 2: 25 Cm Diameter (minimum) Tier 3 : 30 Cm Diameter (minimum) Column Diameter: 20 To 30 Mm (solid) Distance Between Tiers: 15 Cm Over-all Length: 30 Cm (minimum) Assembled Column Is Used For Maximum Strength And Stability Of The Stand Must Be Packed In Set ) 60 Pc Cake Turn Table (type: Turn Table Body Shape : Circular Material: Cast Aluminum Plate.and Cast Iron Base Upper Plate: 30 Cm Diameter (minimum) And 1.4 Cm Thickness (minimum) Base Dimensions: 18 Cm (minimum); 1.4 Cm Thickness (minimum) Total Height: 10 Cm To 15 Cm Turntable With Ball Bearing To Turn Easier Preferably Packed In Any Kind Of Packaging Comes With No Sharp Edges To Rotate Smoothly In 360 Degrees Clockwise Or Counter Clockwise ) 30 Pc Coupler (type: Foood Grade Body Shape: Tubular Material: Hard Plastic, Polypropylene, Any Bright Color Height: 3cm (minimum) Top Diameter: 1.27 Cm (minimum) Bottom Diameter: 2.54 Cm (minimum) Preferably With Storage Case The Materials Used Must Be Non-toxic And Dishwasher Safe ) 50 Set Cup, Measuring (stainless Steel Measuring Cup Set For Dry Ingredients. Composed Of 1 Cup, 3/4 Cup, 1/2 Cup, 1/4 Cup, 1/8 Cup) 50 Set Cup, Measuring 250 Ml. For Liquid Glass (250 Ml Heat Resisting Measuring Glass) 40 Set Cup, Measuring 500 Ml. For Liquid Glass (500ml Heat Resisting Measuring Glass) 40 Pc Cutter, Dough (type: Scrapper Body Shape: Straight Blade Material: Stainless Steel Straight Blade With Stainless Steel Handle Blade Dimension: Lenght : 15 Cm X Width: 11 Cm X Thickness: 1.2 Mm(minimum) Handle Dimension: Length: 15 Cm X Diameter: 3 Cm (minimum) Preferably With Packing Case Food Grade And Dishwasher Safe Design Allows Item To Be Hung For Storage) 40 Pc Cutter, Pie (stainless Steel Rolling Knife/pizza Cutter) 30 Pc Flour Sifter,hand Cranked (type: Hand Cranked Body Shape: Round Shape Material: Stainless Steel Dimension: Diameter: 133.3 Mm ( Minimum) X Height: 165 Mm (minimum) Thickness: 0.79 Mm (minimum) (body) And Constructed With Stainless Steel Wire Mesh # 30 Bottom Volume Markings Should Be Seen Inside And Outside Of The Sifter Capacity: 5 Cups (1.18 Liter) Spring Action Squeeze Handle Stainless Steel Preferably With A Packing Case Dishwasher Safe) 40 Pc Grater (type: Four Sided Box Grater Body Shape: Box In Shape Material: Stainless Steel Blade And Plastic (polypropylene Handle) Grater Dimensions: Height- 25 Cm X Width-13 Cm X Depth-10 Cm (minimum) Side 1: Large-hole Shredder With 6 Mm Hole Side 2: Slicer Side 3: Small-hole Shredder With 3 Mm Hole Side 4: Grater With Strips About 1.27 Cm To 2.54 Cm Length Preferably With Packing Case Food Grade & Dishwashing Safe) 50 Pc Knife, Kitchen (premium Quality Stainless Steel Kitchen Knife, 6-8” In Length) 20 Pc Knife, Pallete (premium Quality Stainless Steel Pallete Knife Ideal For Butter.) 50 Pc Ladle, 3oz (premium Quality Stainless Steel Soup Ladle, 3oz) 40 Pc Loaf Pan, Big (carbon Steel Non-stick Loaf Pan, Size: L=32,w=13,h=7cm Minimum) 40 Pc Loaf Pan, Medium (carbon Steel Non-stick Loaf Pan, Size: L=28, W=15.5, H=7cm Minimum) 40 Pc Loaf Pan, Small (carbon Steel Non-stick Loaf Pan, Size: L=25.5, W=13.5, H=6cm Minimum) 40 Pc Muffin Pan, Big (carbon Steel Non-stick Muffin Pan, 12 Holes,3oz) 40 Pc Muffin Pan, Medium (carbon Steel Non-stick Muffin Pan, 9 Holes,3oz) 40 Pc Muffin Pan, Small (carbon Steel Non-stick Cupcake Pan, 6 Holes) 70 Pc Pie Pan, 10'' (premium Stainless Steel/aluminum Pie Plate. Thick And Durable, 10” In Diameter) 70 Pc Pie Pan, # 8 (premium Stainless Steel/aluminum Pie Plate. Thick And Durable, 8” In Diameter) 50 Set Pillars, Cake (premium Quality Acrylic Cake Support Pillar, 12cm In Diameter(minimum),straw Size Diameter ) 60 Pack Piping Bag (reusable Silicone Piping Bag, Biggest Size, 100pcs Per Pack) 40 Pc Rectangular Pan (carbon Steel Non-stick Rectangular Cake Pan. Size: L=10.8", W=7", H=1.5", Minimum) 70 Pc Rolling Pin, Plastic (non-stick Rolling Pin Made With Food Grade Nylon, Size:13") 100 Pc Rubber Scraper, Silicone (size: 21cm X 4.1cm, Material: Silicone) 40 Pc Sauce Pan Non Stick (non-stick Sauce Pan With Lid, Size: 20cm) 40 Pc Sheet Pan / Cookie Sheet (aluminum Baking Sheet, Size: 13x18”) 50 Set Spoon, Measuring (premium Quality Stainless Steel Measuring Spoon Set, Compost Of 1/8tsp, 1/4tsp, 1/2tsp, 1tsp, 1/4tbsp, 1/2tbsp, 1tbsp)) 70 Pc Spoon,wooden (premium Quality And Durable Long Handled Wooden Spoon/ladle. Length: 30.5cm Minimum) 40 Pc Strainer (stainless Steel, Fine Mesh Strainer, Size: 18cm) 40 Set Tip, Decorating, Large (type: Tube Tips Body Shape: Nozzles With Different Shape Material: Stainless Steel Tube Height: 3.5 Cm To 5 Cm Tube Diameter: 2 Cm To 3.5 Cm Thickness: 0.5 Mm (minimum) Tube Tip: Assorted Designs (create Swirls, Rosettes, Flowers, Roping,stars, Leaves And Other Designs Comes With 24 Different Shapes Of Nozzles Packed In Plastic Storage Box Smooth And Deformities Free Must Be Branded) 30 Pc Weighing Scale, 10 Kg. (kitchen Weighing Scale, 10kg Maximum) 40 Pc Weighing Scale, 5 Kg. Digital(digital Kitchen Weighing Scale, Digital Price Computing Weight Electronic Scale, Capacity Is At Least 5kilograms, Pan Size 34.5 X 23.5cm) 70 Pc Wire Whisk, Medium (stainless Steel Wire Whisk, Size: 14”) Lot 5. Sumirap National High School And Tangub City National High School ( Cookery Nc Ii )-php 1,405,964.00 30 Pcs. Apple Corer, Body Shape: Tubular Material: Stainless Steel Total Length: 18 Cm (minimum) Handle Material: Hard Plastic, Polypropylene Handle Dimension: Length-10 Cm X Diameter-2 Cm (minimum) Blade Size: Length-8cm X Diameter-2 Cm (minimum) Preferably With Packing Case Dishwasher Safe. 4 Pcs. Bain Marie, Table, (food Warmer) Body Shape: Rectangular Material: 304 Stainless Steel, 0.8 Mm Thick (minimum) Dimensions: Length-1500 Mm X Width-700mm X Height-800 Mm (minimum) Power Soiuce: Voltage: 220 Volts - 230 Volts, 50 Hz/ 60 Hz With Royal Cord 1.5 Meter Long With Attachment Standard Type A Male Plug Or Provide Plug Adopter 10a/220v 20 Pcs. Blender, Electric Heavy Duty, Body Shape: Round Jar Material Housing: Plastic (polypropylene) Jar Height : 25 Cm To 28 Cm Jar Thickness: 4 Mm To 8 Mm Heat Resistant Glass Jar With Cover Source Voltage: 220 Volts / 240 Volts,50 Hz / 60 Hz With Power Cord 1.5 Meter Long With Attachment Of Standard Type A Male Plug Or Provide Plug Adopter 10a/220v. Power Wattage: 300 To 700 Watts Blade: Stainless Steel, 3 To 4 Metal Blades 40 Pc Board, Chopping/ Cutting, Plastic, Body Shape: Rectangular Material: Plastic (polypropylene), Food Grade Board Size: Length: 15 Inches (minimum) Width: 12 Inches (minimum) Thickness: 0.5 Inch (minimum) With Hole For Storage Purposes Preferably With Packing Case Food Grade And Dishwasher Safe. 20 Pcs. Boiler, Double, Material: Stainless Steel Thickness: 1/16 Inch (1.5 Mm) (minimum) Lid Material: Glass Riveted Handle On Both Side Diameter: 9 1/2 Inches (minimum) Total Height: 9.4 Inches (minimum) Inset Bottom Diameter: 9 Inches (minimum) Inset Top Diameter: 9 Inches (minimum) Capacity: 2 Liters (minimum) 30 Pcs. Braising Pan, Medium, Body Shape: Round Material: Enameled Cast Iron And Stainless Steel Size: Diameter: 28 Cm X Height: 10 Cm (minimum) Capacity: 4 Liters (approximate) With Stainless Steel Cover, Solid Cast Stainless Steel Side Handles And Riveted Handle On Both Side: Length: 10 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm 30 Pcs. Can Opener, Body Shape: Materials: Stainless Steel Dimension: Length-21 Cm X Width 10 Cm X Depth:2.5cm (minimum) Multi-use: 3 In 1 Can Opener Also Opens Bottle Tops- Can Lids And Tabs. 30 Pcs. Casserole,medium Pot, Body Shape:round Material:stainless Steel, 0.7 Mm Thick Dimension: Diameter- 24 Cm X Height -14 Cm (minimum) Tempered Glass Lid Welded Handle On Both Sides, Size: 7.5 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm Preferably With Packing Case . 30 Pcs. Casserole,small Pot, Body Shape: Round Material: Stainless Steel, 0.7 Mm Thick Dimension: Diameter- 20 Cm X Height -12 Cm (minimum) Tempered Glass Lid Welded Handle On Both Sides, Size: 7.5 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm. 20 Pcs. Colander, Medium, Medium Body Type: Round Material: 304 Stainless Steel Diameter: 30 Cm (minimum) Capacity: 8 Quarts (9 Liters) Welded Handle On Both Sides, Size: 7.5 Cm (minimum) Handle Diameter: 8 To 10 Mm Body Thickness: 0.8 Mm (minimum) 20 Pcs. Colander, Small, Body Shape: Round Material: 304 Stainless Steel Diameter: 26 Cm (minimum) Capacity: 5 Quarts (5.6 Liters) Welded Handle On Both Sides, Size: 7.5 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm Body Thickness: 0.8 Mm (minimum) Full-ring Support Base, 15 Cm Diameter Preferably With Packing Case Food Grade And Dishwasher Safe 20 Set Cup,measuring( For Solid) Set Body Shape: Round Material: Stainless Steel, 0.7 Mm Thick (minimum) Each Set Contains The Following: 1 Pc - 1 Cup (237 Ml) 1 Pc - 1/2 Cup (118 Ml) 1 Pc - 1/3 Cup (79 Ml) 1 Pc - 1/4 Cup (59 Ml) Handle Dimension: Length-12 Cm X Width-1 Cm (minimum) Measuring Capacity Engraved On The Handle Strip Handles Have Provision For Hanging Preferably With Packing Case Smooth Surfaces And Dishwasher Safe 20 Pcs. Dispenser,paper Towel Body Shape: Rectangular Material: Abs Plastic Dimensions: Length =260 Mm X Width =100 Mm X Height = 211 Mm (minimum) Capacity: 200 Paper Paper Size: Length-20 Cm X Width- 8 Cm (approximate) Mounting Style: Wall Mounted Tissue Box 12 Pcs. Fan, Electric, Ceiling Material: Metal, Plastic Size/diameter: 18 Inches Power Rating: 70 Watts (minimum), 220 / 240 Vac, 50 / 60 Hz, Single Phase Rotation Angle: 90 Degrees Base: Stable, 16 Inches Diameter (approx.) Removable Metal Guard On Front And Rear 3-speed Settings Comes With 1.5 Meters Power Cord And With Molded Male Plug To Adapt Type A Outlet (or Providing 3a Minimum Plug Adapter Is An Option) Smooth Surface, No Sharp Edges Includes User's Manual In English Which Contains: A. A Diagram Of The Parts With Their Names 6 Pcs. Fire Extinguisher With Contents .for Type A, B, C Fire: Dry Chemicals (monoammonium Phosphate) 2.portable Type 3.capacity : 5 - 6 Kgs 4.rechargeable Cylinder Metal 5.working Pressure Of Cylinder : 400 Psi 6.brass Valve With Pressure Gage 7.with Rubberized Hose And Aluminum Nozzle Attached 8.with Squeeze Lever To Discharge And Safety Pin 10.painted With Metal Primer And Red Enamel Paint 20 Pcs. Fish Poacher,medium, Body Shape: Oval Pot For Poaching Material: Stainless Steel, 0.64 Mm Thick Dimensions (l X W X D): 45 Cm X 15 Cm X 12 Cm (minimum) Handle Material: Stainless Steel Riveted Looped Handles On Both Side, 7 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm Includes Stainless Steel Lid With Handle And Removable Insert 20 Pcs. Fork, Carving Body Shape: Square Shape Prong Prong Material:high Carbon Stainless Steel Overall Length: 30 Cm (minimum) Blade Dimension: Length- 15 Cm X Width- 0.5 Cm X Thickness- 0.3 Cm (minimum) Number Of Prongs: 2 Prong Comes With Square- Shaped Prongs And Pointed Tips Abs Plastictriple-riveted Handle Preferably With Packing Case 400 Pcs. Fork, Kitchen Body Shape: Standard Material: Stainless Steel Dimension: Length - 32 Cm X Width- 3.5 Cm (minimum) Fork Size: Length: 8 Cm X Width -3.5 Cm (minimum) Handle :abs Plastic Number Of Tines: 2 Tines With Tapered End 36 Dozen Frying Pan, Large, Non Stick, Body Shape: Round Pan Material: Aluminum With Non-stick Coating Thickness: 3 Mm Thick (minimum) Dimension: Diameter-30 Cm (minimum) X Height- 5.5 Cm (minimum) 40 Pcs. Frying Pan, Medium, Non Stick, Body Shape: Round Pan Material: Aluminum With Non-stick Coating Thickness: 3 Mm Thick (minimum) Dimension: Diameter-24 Cm (minimum) X Height- 4.5 Cm (minimum) Handle Material: Stainless Steel With Silicone Riveted Handle: 19 Cm Long (minimum) Preferably With A Packing Case 30 Pcs. Frying Pan Small, Non Stick , Body Shape: Round Pan Material: Aluminum With Non-stick Coating Thickness: 3 Mm Thick (minimum) Dimension: Diameter-20 Cm (minimum) X Height- 3.8 Cm (minimum) Handle Material: Stainless Steel With Silicone Riveted Handle: 12 Cm Long (minimum) Preferably With A Packing Case Oven Safe Up To 250⁰f 22 Pcs. Funnel, S/s, Medium, Body Shape: Round Material: 304 Stainless Steel Dimension: Diameter-15 Cm (minimum) X Height- 15.8 Cm (minimum) Tube Diameter: 2 Cm X Length: 7.3 Cm (minimum) Comes With Handle For Easy Hanging Preferably With Packing Case Dishwasher Safe 22 Pcs. Funnel, S/s, Small, Body Shape: Round Material: 304 Stainless Steel Dimension: Diameter-11 Cm (minimum) X Height- 10 Cm (minimum) Tube Diameter: 1.5 Cm X Length: 5 Cm (minimum) Comes With Handle For Easy Hanging Preferably With A Packing Case Dishwasher Safe. 20 Pc Garbage Bin, Body Shape: Round Material: 304 Stainless Steel Dimension: Diameter-11 Cm (minimum) X Height- 10 Cm (minimum) Tube Diameter: 1.5 Cm X Length: 5 Cm (minimum) Comes With Handle For Easy Hanging Preferably With A Packing Case Dishwasher Safe. 20 Pc Glass Rack, Body Shape: Square Material: Polypropylene Plastic Overall Dimensions: Length - 19 1/2 Inches X Width - 19 1/2 Inches X Height - 4 Inches (minimum) Compartments: Full-size 25 Individual Compartment Glass Rack Compartment Dimensions: Length - 3 1/2 Inches X Width - 3 1/2 Inches X Height - 4 Inches (minimum) Easy Grip Handles Molded Into All Four Sides Preferably With A Packing Case 20 Pc Ice Cream Scoop, Stainless Steel Ice Cream Scoop 45mm. Simply Squeeze Handle. 30 Pc Knife,boning, Body Shape: Ergonomic Material: High Carbon Steel Overall Length: 28 Cm (minimum) Blade: Length-15 Cm X Width- 3 Cm (minimum), Pointed Tip Cutting Edge Angle From Tip To The Heel Is 13 To 14 Degrees Handle Length: 12 Cm (minimum) Handle Material: Hard Plastic Handle With Rivets Preferably Wiht Packing Case Dishwasher Safe 30 Pc Knife,chef, Body Shape: Flat Materials: Stainless Steel Overall Length: 30 Cm (minimum) Blade Size: Length - 20 Cm X Width-4 Cm (minimum) Blade Thickness: 2.5 Mm (minimum) 30 Pc Knife,cleaver, Cutting Edge: Straight, Pointed End Type: Cleaver Knife Body Shape: Flat Blade Material: Forged Stainless Steel Heavy Duty Blade Length: 17 Cm (minimum) Overall Length: 30 Cm (minimum Cutting Edge: Straight Handle Material: Ergonomic Wood Handle With Triple Rivets Blade Thickness: 3 Mm (minimum) 30 Pc Knife,oyster, Body Shape: Ergonomic Blade Material: Stainless Steel Blade Dimension: Length - 7 Cm (minimum) X Width - 2 Cm (minimum) Blade Thickness: 2 Mm (minimum) Handle Material: Smooth Wooded Handle Rounded Handle Size: Length-10 Cm X Diameter- 3.5 Cm (minimum) Total Length (from The Tip Of The Handle Up To Tip Of The Blade) :17 Cm (minimum) 4 Pc Light,emergency, 2 Heads Led Materials: Metal, Anti-rust Coated Duration Time (2 Heads): 5 Hours (minimum) Automatically Light Up During Power Outage Overcharge And Over- Discharge Protection Built - In Ac Charger, Power Cord Plug To Adapt Type A Outlet (or Providing 5a Minimum Plug Adapter Is An Option) Battery Test Switch - External Safety Fuse Head: White Led 1w (minimum) 3.5 " Dome Reflector 4 Pc Meat Slicer, Body Shape: Circular Housing Material: Die Cast Aluminum Alloy And Body Painted Dimensions: Width-40.5 Cm X Depth- 45.7 Cm X Height- 38 Cm (minimum) Stainless Steel Rotary Blade Diameter: 190 Mm (minimum) Power Source: 220 Volts-230 Volts, 60 Hz With Power Cord 1.5 Meter Long With Attachment Of Standard Type A Male Plug Or Provide Plug Adopter 10a/220v 30 Set Pastry Tube, Stainless Steel Pastry Tube 24, Big 40 Pc Peeler, Y -type, Rack Dimension: Length: 38 Cm X Width 23 Cm (minimum) Type: Y-type Peelers Body Shape: Ergonomic Material: Stainless Steel Overall Dimensions (l X W X H): 7 Inches X 2 1/4 Inches X 1 Inch (minimum) Blade Material: 304 Stainless Steel, 0.7 Mm Head Dimension: (l X W X H) 2 1/4 Inches X 2 1/4 Inches X 1 Inch (minimum) Handle Material: Stainless Steel Handle Length: 4 3/4 Inches X 1 Inch Diameter (minimum) 2 In 1 Design With 2 Blade Reel, Built In Potato Eye Remover And Hole For Hanger Preferably With A Packing Case 14 Set Pepper And Salt Mill Food Grade And Non-toxic Material. Mill Cookery Nc Ii Type: Pepper & Salt Mill Body Shape: Round Body Material: Wood Size: Diameter: 5 Cm X Height: 20 Cm (minimum) Carved Of Wood With Stainless Steel Grinding Mechanism 20 Pack Piping Bag, Body Shape: Triangular Material: Transparent Disposable Plastic For Dispensing Ingredients To Pastries Length: 9 Inches Minimum Width: 3 Inches (minimum) Volume: 500 Ml (approximate) 10 Pc Plate Rack Shape: Rectangular Material: 304 Stainless Steel Dimension: Length-475 Mm X Width- 290 Mm X Height- 380 Mm (minimum) 12 Set Preparation Table With Sink, Heavy Duty Wire Shelving, 2.6 Mm Diameter (minimum) Table With Sink Cookery Nc Ii Type: Preparation Table With Sink & Sheleves Body Shape: Rectangular Material: Stainless Steel, 1 Mm Thick (minimum) Dimensions: L-1200 Mm X W - 700 Mm X H - 850 Mm (minimum) Stainless Steel Table Top And Stainless Steel Under Shelf Fully Welded Construction Sink: Left Side Single Bowl Sink With Drainer 4 Inches & Faucet Provision Sink Dimension (l X W X D) 400 Mm X 500 Mmx 25 Mm (minimum) 4 Pc Pressure Cooker, Cooker Body Shape: Round Material: Polished Aluminum Dimension: Diameter: 32 Cm X Height: 25 Cm (minimum) Capacity: 10 Quarts (11.3 Liters) Side Handles For Secure Carrying Equipped With Safety Opening Mechanism, Spring Safety Valve, Rubber Seal Ring 24 Pc Roasting Pan , Body Shape:rectangular Material: Stainless Steel Dimension: Length: 40 Cm X Width-35 Cm X Height -7 1/2cm (minimum) Thickness: 1.5 Mm Thick (minimum) Welded Handles On Both Sides Removable Stainless Steel Wire Rack 40 Pc Scissor, Kitchen Type:kitchen Scissor Body Shape: Ergonomic Blade Material: Stainless Steel, 2 Mm Thick Handle Material Heavy Duty Acrylonitrile Butadiene Styrene (abs) Plastic Overall Length: 20 Cm (minimum ) Width: 7.5 Cm (minimum) 30 Pc Siever,small Type: Fine Mesh Siever Body Shape: Round Material: Stainless Steel Diameter: 20 Cm (minimum) Depth: 7 Cm (minimum) Twin Wire Handle: Length 20 Cm X 5 Mm Diameter (minimum) Fine Mesh: 0.7 Mm (1/32 Inch) (minimum) Preferably With A Packing Case 30 Pc Skimmer, Fine Type: Medium Fine Mesh Skimmer Body Shape: Round Material: Stainless Steel, Polished Overall Length: 34 Cm (minimum) Skimmer Head: Diameter -10 Cm X Depth- 4 Cm (minimum) Diameter Of Holes: 2 Mm (approx.) Handle: Length- 12 Cm X Diameter- 2 Cm (minimum) Handle Has Hole For Hanging Preferably With A Packing Case 30 Pcs. Skimmer,spider, Dishwashing Safe Type: Skimmer, Spider Body Shape: Round Material: Stainless Steel, Polished Overall Length: 35 Cm (minimum) Skimmer Head Diameter: 15 Cm X Depth 4 Cm (minimum) Handle Length: 12 Cm X 2 Cm Diameter (minimum) Preferably With A Packing Case Dishwasher Safe. 24 Pcs. Soup Cup, Rack Body Shape: Square Material: Polypropylene Plastic Dimension: Length: 50 Cm X Width: 50 Cm X Height: 10 Cm (minimum) Compartment Length: 11 Cm Compartment Width: 11 Cm Compartment /inside Height: 6.7 Cm No. Of Compartment: 16 Compartments 20 Pc Soup Ladle, 12oz Body Shape: Round Material: Stainless Steel Thickness: 1 Mm Thick (minimum) Handle Length: 34 Cm (minimum) Capacity: 12 Oz. (341 Ml) Ladle Type: Round Bottom Hooked Handle Design Allows It To Easily Sit On The Edge Of Pots. Preferably With A Packing Case Dishwasher Safe 20 Pc Soup Ladle, 3 Oz Body Shape: Round Material: Stainless Steel Thickness: 1 Mm Thick (minimum) Handle Length: 28 Cm (minimum) Capacity: 3 Oz. (85 Ml) Ladle Type: Round Bottom Hooked Handle Design Allows It To Easily Sit On The Edge Of Pots. Preferably With A Packing Case Dishwasher Safe Must Be Branded 20 Pc Soup Ladle 6 Oz. Body Shape: Round Material: Stainless Steel Thickness: 1 Mm Thick (minimum) Handle Length: 30 Cm (minimum) Capacity: 6 Oz. (170 Ml) Ladle Type: Round Bottom Hooked Handle Design Allows It To Easily Sit On The Edge Of Pots. Preferably With A Packing Case Dishwasher Safe 20 Pc Soup Ladle 8 Oz. Body Shape: Round Material: Stainless Steel Thickness: 1 Mm Thick (minimum) Handle Length: 30 Cm (minimum) Capacity: 8 Oz. (236 Ml) Ladle Type: Round Bottom Hooked Handle Design Allows It To Easily Sit On The Edge Of Pots. Preferably With A Packing Case 62 Pc Spatula, Type: Offset Spatula Body Shape: Flat Blade Material: Stainless Steel 316 Handle Material: Hardwood (smooth Finish) With Rivets Blade Dimension: Length= 7 .5 Inches X Width-1.5 Inches (minimum) Thickness Of Blade: 1.7 Mm Thick (minimum) Total Length = 12 To 14 Inches Preferably With A Packing Case Dishwasher Safe Must Be Branded. 400 Pc Spoon, Kitchen Body Shape: Oval Material: Stainless Steel, 1.5 Mm Thick Overall Length: 30.5 Cm X Width-7.5 Cm (minimum) Spoon Head Dimension (l X W) 9 Cm X 7.5 Cm (minimum) Handle: Abs Plastic Spoon Head: Oval Type Preferably With A Packing Case Heat Resistant Up To 220 ° C Dishwasher Safe Must Be Branded. 60 Pc Spoon, Kitchen (slotted) Kitchen Spoon Slotted Body Shape: Oval With Slot Material: Stainless Steel, 1.5 Mm Thick Overall Length: 30.5 Cm X Width-7.5 Cm (minimum) Spoon Head Dimension (l X W) 9 Cm X 7.5 Cm (minimum) 30 Set Spoon, Measuring Body Shape: Bowl In Shape Material: Stainless Steel, 0.7 Mm Thick (minimum) The Set Consists Of The Following Sizes: 1 Pc - 1 Tbsp. (15 Ml) 1 Pc - 1/2 Tbsp. ( 7.5 Ml) 1 Pc - 1 Tsp. (5 Ml) 1 Pc - 1/2 Tsp. (2.5 Ml) 40 Pcs. Spoon, Parisienne Body Shape: Round Double Headed Parisiennes Scoop Bar Tool Material: Stainless Steel, Polished Overall Length: 240 Mm (minimum) Scoop Diameter: 30 Mm And 24mm (minimum) With Plastic Handle (polypropylene), Size: 130 Mm X Width-20 Mm (minimum) Draining Small Hole In The Scoop 40 Pc Spoon, Serving Preferably With A Packing Case Type: Serving Spoon Body Shape: Oval Materials: Stainless Steel Dimension: Length: 23 Cm X Width: 5 Cm (minimum) Scoop Dimension (l X W X D): 7 Cm X 5 Cm X 0.9 Cm (minimum) Spoon Thickness: 1.6 Mm (minimum) Preferably With A Packing Case Dishwasher Safe Must Be Branded. 30 Pc Spoon,wooden Body Shape: Oval Material: Hardwood Dimensions: Length- 10 Inches X Width- 2 Inches (minimum) Bowl Dimension: Length -3 Inches X Width 2 Inches X Depth -3/4 Inches (minimum) Total Length: 10 Inches (minimum) Preferably With A Packing Case Smooth Surface Finished And No Sharp Edges 20 Pc Stock Pot,large . Body Shape: Round Material: Stainless Steel, 0.8 Mm Thick (minimum) Top Diameter: 30 Cm (minimum) Height: 31 Cm (minimum) 30 Pc Strainer, Chinois,small Body Shape: Conical Material: Stainless Steel Strainer Diameter: 20 Cm (minimum) Strainer Depth: 21.5 Cm (minimum) Handle Length: 20 Cm (minimum) With 2 Mm. (approx.) 30 Pc Strainer,chinois,medium Medium Body Shape: Conical Material: Stainless Steel Strainer Diameter: 20 Cm (minimum) Strainer Depth: 21.5 Cm (minimum) Handle Length: 20 Cm (minimum) With 2 Mm. (approx.) 26 Pc Strainer,medium,fine Body Shape: Round Material: Stainless Steel Strainer Diameter: 20 Cm (minimum) Strainer Depth: 7 Cm (minimum) Handle Length: 18 Cm (minimum) With 2 Mm. (approx.) 30 Pc Strainer, Small,fine Body Shape: Round Material: Stainless Steel Strainer Diameter: 13 Cm (minimum) Strainer Depth: 5 Cm (minimum) Handle Length: 13 Cm (minimum) With 1 Mm. (approx.) 30 Pc Tenderizer, Medium Aluminum Meat Tenderizer 16 Pc Thermometer,pocket/pin Pocket/pin Food Thermometer 20 Pc Tong,12'' Body Shape: Standard Material: Stainless Steel Size: 12 Inches Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Tongs Lock Closed For Storage Preferably With A Packing Case Food Grade And Dishwasher-safe Must Be Branded 20 Pc Tong 8'' Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Tongs Lock Closed For Storage Preferably With A Packing Case Food Grade And Dishwasher-safe Must Be Branded 30 Pc Tray,baking,small, Tray Body Shape: Rectangular Material: Stainless Steel Dimension: 20 Cm X 30 Cm X 3.7 Cm (minimum) 36 Pc Tray,utility,medium,plastic White Plastic, White Multi Purpose 13”x10”utility Tray 30 Pc Turner,3'x6'', Slotted Turner, 3" X 6" Type: Slotted Turner, 3" X 6" Body Shape: Straight Material: Stainless Steel Blade Size (lx W): 6 Inches X 3 Inches (minimum) Handle Length: 5 Inches (minimum) Overall Length: 13 Inches (minimum) Solid Turner With Straight Slotted Blade Wooden Handle With Triple Rivets Preferably With A Packing Case Dishwasher Safe Must Be Branded 4 Pc Utility Cart, Stainless Steel 3 Tier Trolley Cart 75x40x85. 20 Pc Weighing Scale 1 Kg. Digital Type: Digital Weighing Scale Body Shape: Rectangular Materials: Engineering Plastic And Stainless Steel Weighing Plate Capacity: 1 Kg Accuracy: 1 Gram Back Light Lcd Display With 15 Mm Minimum High Digits Weighing Units: Gram, Ounce, Pound Size: (l X W X H Mm ) 163 Mm X 245 Mm X 79 Mmm (minimum) 20 Set Weighing Scale 5kg. Type: Mechanical Weighing Scale Body Type: Circular Bowl Material: Stainless Steel Bowl And Metal Body (coated) Mechanism Type: Spring Lever Capacity: 5 Kg /11 Lb. Sensitivity/graduated By 10 Gm Measurement Units: Gram/kilogram Manual Setting On Zero, Must Be Accurate And Durable Calibrate The Scale Using The Adjustment Knob Preferably With A Packing Case Delivery Must Include Instruction Manual Written In Good English With Service Centers Located In The Major Cities In The Philippines Warranty Period Of 1 Year (parts And Service) Must Be Branded 40 Set Wire Skimmer Small, Type: Skimmer, Wire Mesh Body Shape: Round Material: Stainless Steel, Polished Overall Length: 40 Cm (minimum) Skimmer Head Diameter: 12 Cm (minimum) Diameter Of Holes: 2 Mm (approx.) Handle Has Hole For Hanging Preferably With A Packing Case Dishwashing Safe Must Be Branded. 40 Pc Wire Whisk Heavy Duty Type: Wire Whisk, Heavy Duty Body Shape: Ballon Material: Heavy Duty Stainless Steel Dimensions (l X W): 31.8 Cm X 7.6 Cm (minimum) Handle Length: 12 Cm (minimum) With Hanging Loop No. Of Wires: 8 Wires Wire Diameter: 2 Mm (minimum) Preferably With A Packing Case Dishwasher Safe Must Be Branded. 40 Pc Wire Whisk, Medium, Type Wire Whisk, Medium Body Shape: Ballon Material: Stainless Steel Wire Whisk Medium Dimensions (l X W): 25.4 Cm X 7 Cm (minimum) Handle Length: 10 Cm (minimum) With Hanging Loop No. Of Wires: 6 Wires Wire Diameter: 1.8 Mm (minimum) Preferably With A Packing Case Dishwasher Safe Must Be Branded. 40 Pc Wire Whisk,small, Type: Wire Whisk, Small Body Shape: Baloon Material: Stainless Steel Wire Whisk Medium Dimensions (l X W): 20.3 Cm X 6 Cm (minimum) Handle Length: 10 Cm (minimum) With Hanging Loop No. Of Wires: 6 Wires Wire Diameter: 1.8 Mm (minimum) Preferably With A Packing Case Dishwasher Safe Must Be Branded. 18 Pc Wok,medium Type: Wok, Medium Body Shape:round Material: Carbon Steel Thickness: 1.8 Mm Thick (minimum) Dimensions (dia. X H): 45 Cm X 14 Cm (minimum) Handle Material: Steel Riveted Convenient Both Side Handle 10 Cm (minimum) With Flat Bottom Preferably With A Packing Case Dishwashing Safe Must Be Branded 18 Pc Wok,small Type: Wok, Small Body Shape: Round Material: Carbon Steel Thickness: 1.5 Mm Thick (minimum) Dimensions (dia. X H): 36 Cm X 10 Cm (minimum) Handle Material: Steel Riveted Convenient Both Side Handle 8 Cm (minimum) With Flat Bottom Preferably With A Packing Case Dishwashing Safe Must Be Branded 12 Pc Working Table, Stainless, 4 Seaters Stainless Working Table , Two Layer (120x60x80) 30 Pc Zester, Type: Cheese Zester Body Shape: Standard Material: Stainless Steel Grating Surface Dimensions (l X W): 20.3 Cm X 4 Cm (minimum) Overall Length: 32.5 Cm (minimum) Handle Material: Plastic (polypropylene) Ergonomic Handle Preferably With A Packing Case Dishwasher Safe The Plastic Material Used Must Be Non-toxic Must Be Branded. Lot 6. Sumirap National High School (housekeeping Nc Ii)-php 326,452.00 1 Pc Alarm Clock Alarm Clock, Digital, Overall Dimensions: 13.5 X 8 X 4.5 Cm (approx.) Material: Plastic (pe/abs) Illuminated Lcd Digital Display: Time (12/24), Calendar (mm/dd), Temperature, Alarm Status (on/off), Snooze Display Size: 10 X 5 Cm (minimum), Time Can Be Read 30 Ft Day Time. Runs On Aaa Battery Which Come Together With The Item Smooth Surface, No Sharp Edges, Includes User's Manual Which Contains Operation Procedure, Name Of Parts, Safety Precautions, Trouble Shooting) 25 Pc Apron, Polyester-cotton (bib Apron, Sleeveless Adjustable Neck Loop Material : Polyester - Cotton Fabric Dimension : 70 To 60 Cm (minimum) With 2 Or 3 Pockets Uni-color, Dark No Sharp Edges And Loose Threads) 5 Pc Baskets, Laundry (3 - Bag Laundry Sorter, With Wheels Bag: Polyester, Rectangular Shape, Detachable From Frame With Metal Handle And Hanging Hook Bag Dimensions : Rectangular 22 X 15 X 8 Inch (minimum) Frame Material : Corrosion Resistant Steel, Sturdy No Wobble Frame Overall Dimensions : Rectangular, 31 X 30 X15 Inch (minimum) With Four Casters, 2 Inch Diameter (minimum) Smooth Surface, No Sharp Edges) 1 Set Bed, Queen (bed Set, Queen Size (60 X 75 Inch) Rectangular 1) Frame: Knock-down Type, All Steel, Powder Coated Including Head Board, Bare Weight: 20 Kg (minimum) No Wobble And Noise 2) Comes With Fabric Covered Foam 6 Inches Thick Foam Density: 29 -33 Kg/cu.m. 3) No Sharp Edges) 1 Set Bed, Single (bed, Single Size (w36 X L75 Inch) Rectangular 1) Frame: Knock-down Type, All Steel, Powder Coated Including Head Board, Bare Weight: 13 Kg (minimum) No Wobble And Noise 2) Comes With Fabric Covered Foam 6 Inches Thick Foam Density: 29 -33 Kg/cu.m. 3) No Sharp Edges) 10 Pc Board, Ironing (type: Foldable Type Ironing Board Body Shape : Standard Material : 25 Mm Tubing Approx., 0.8 Mm Thickness Board Size: 32 Inches (minimum ) Body Size :120 Cm X 30 Cm X 5 Cm Color : Any Comes With Box No Sharp Edges) 25 Pair Boots, Safety, Plastic (upper Material: Elastic Pvc Sizes: 7 Inches - 5pcs 8 Inches - 5pcs 9 Inches - 5pcs 10 Inches -5pcs 11 Inches - 5pcs Height: 13 To 14 Inches Plain Toe Type Of Boots: Unisex Rain Boots With Rugged Tractor Lug Outsole Packed With Carton Box Per Size) 15 Pc Brushes, For Housekeeping (brush, Floor Scrubbing, Angled Long Handle Bristle Material : Plastic, Stiff Handle Material : Metal Tubular Corrosion Reistant, Overall Length : 120 Cm. (minimum) Bristle Length : 5 Cm (=/- 1cm) Scrubbing Surface : 25 X 6 Cm (+/-1 Cm) No Sharp Edges) 10 Pc Buckets, Water (water Bucket Bucket Material : Hard Plastic, Round Body Capacity : 10 To 12 Liters Handle Material : Steel Smooth And Glossy Surface, No Sharp Edges) 10 Pc Caddy, Toilet (carrying Caddy For Toilet Cleaning Supplies Holds Spray Bottles And Other Cleaning Supplies, No. Of Compartments: 3 (minimum) Material :plastic Tray Depth: 11 Cm (approx.) Overall Dimension: 36 X 26 Cm (approx.) Smooth Surface, No Sharp Edges) 1 Unit Carpet Sweeper (carpet Sweeper, Cordless Electric Motorized Single Brush Roll (removable) Body Material : Hard Plastic ,(abs) Or Its Equivalent, Any Color Equipped With Rechargeable Battery (16 Minutes Run Time On Carpet), Removable Dirt Box Sweep Width : 8 Inches (minimum) Capacity (volume) : 0.35 Lit.(minimum) Handle: Metal, Powder- Coated, With Plastic/rubber Grip, Swivel Steering Assembled Height: 44 Inches (minimum) Comes With Battery Charger 220/240vac, 50/60hz With Plug To Adapt Type A Outlet (or Providing 3a Minimum Plug Adapter Is An Option) No Sharp Edges Includes User's Manual Which Contains Operation Procedure, Name Of Parts, Safety Precautions, Trouble Shooting.) 1 Unit Cart, For Housekeeping Nc Ii (housekeeping Cart Trolley, Equipped With Three-shelves With Steel/laminated Panels Single Door, Top Layer With Divider, Bag Holder, And 4 Wheels. Cart Frame: Steel, Powder Coated. Wheels: 2non-swivel 2 Swivel, 6 Inch Diameter, Non-markings. Overall Dimensions : Rectangular 90 X 48 X 1010 Cm (minimum) Comes With Accessory Linen Bag Smooth Surface, No Sharp Edges) 50 Pc Cleaning Cloth, Linth-free (lint Free Cleaning Cloths Material : Cotton Dimensions : Rectangular 16 X 26 Inch) 1 Unit Coffee Maker (coffee Maker, Electric Material: Metal, Plastic, Glass. Capacity: 6 Cups (minimum). Detachable Tank, With Water Level Indicator. Non-stick Warming Plate : Removable And Washable Filter Non-drip Valve : Lighted On/off Switch Power Supply: 220 V -240 V Ac 50/60 Hz , 500w Minimum Comes With A Heat Resistant Glass Pitcher. With A 1 Meter (minimum) Power Cord, Molded Male Plug To Adapt Type A Outlet (or Providing 5a Minimum Plug Adapter Is An Option). Smooth Surface, No Sharp Edges With Dti-bps Certification, Brand And Electrical Ratings Clearly And Permanently Mark On The Item. Comes With English Manual That Contains: Users Guide, List Of Parts, Maintenance Guide, Safety Guide. 1 Year Warranty Parts And Service With Service Centers Located In Major Cities In The Philippines) 5 Pc Dust Pan (dust Pan, Upright Standing Material: Plastic Overall Length: 65 Cm (minimum) Pan: Round Back, 24 X 26 X 9 Cm (minimum) Smooth Surface, No Sharp Edges) 5 Pc Duster, Anti-static (anti-static Duster Duster Material : Polypropylene Micro Fiber Duster: Length : 30 Cm (minimum), Overall Length: 50 Cm (minimum) Handle Material : Hard Plastic, No Sharp Edges) 7 Unit Fan, Electric ( Stand Fan, Electric Material: Metal, Plastic Size/diameter: 18 Inches Power Rating: 70 Watts (minimum), 220 / 240 Vac, 50 / 60 Hz, Single Phase Rotation Angle: 90 Degrees Base: Stable, 16 Inches Diameter (approx.) Removable Metal Guard On Front And Rear 3-speed Settings Comes With 1.5 Meters Power Cord And With Molded Male Plug To Adapt Type A Outlet (or Providing 3a Minimum Plug Adapter Is An Option) Smooth Surface, No Sharp Edges Includes User's Manual In English Which Contains: A. A Diagram Of The Parts With Their Names, B. Operating Procedures On How To Use The Equipment, C. Safety Precautions When Using The Equipment, D. Basic Troubleshooting And Maintenance Procedures With Dti-bps Certification, Brand And Electrical Ratings Clearly And Permanently Mark On The Item 1 Year Warranty Parts And Service) 3 Pc Fire Extinguisher(with Contents) (1.for Type A, B, C Fire: Dry Chemicals (monoammonium Phosphate) 2.portable Type 3.capacity : 5 - 6 Kgs 4.rechargeable Cylinder Metal 5.working Pressure Of Cylinder : 400 Psi 6.brass Valve With Pressure Gage 7.with Rubberized Hose And Aluminum Nozzle Attached 8.with Squeeze Lever To Discharge And Safety Pin 10.painted With Metal Primer And Red Enamel Paint 11.includes With User's Guide In English That Contains: A. Operating Procedure On How To Use The Equipment B. Safety Precaution When Using The Equipment 12.1 Year Warranty Parts And Service 13.the Item Must Be Branded And Have Good Quality) 10 Pc Flashlight (flashlight Led 1,000 Lumens (minimum), Color : White , Battery: Rechargeable, At Least 3,500 Mah , Can Be Used Also With 3 X Aaa Batteries; Body: Aluminum Alloy, No Sharp Edges Dimensions : 5 Inches X 1 Inch Diameter (minimum) Operating Duration Of Battery When Fully Charged : At Least 2 Hours; Includes 220/240vac, 50/60hz Power Adapter /charger And User's Manual In English Which Includes: A. A Diagram Of The Parts With Their Names, B. Operating Procedures On How To Use The Equipment, C. Safety Precautions When Using The Equipment, D. Basic Troubleshooting And Maintenance Procedures Branded, With 1 Year Warranty 10 Pc Flat Iron (clothes Flat Iron, Electric Material : Metal /plasic Body, Heat-resistant Plastic Handle, Aluminum Sole Overall Dimension : (l X W X H) 25 Cm X 12 Cm X 12 Cm (minimum) Power Rating : 220/240 Vac, 50/60 Hz; 1000 Watts (minimum) Equipped With Light Indicator, Variable Temperature Control, Overheat Protection, Power Cord And Plug To Adapt Type A Outlet (or Providing 10a Plug Adapter Is An Option) Smooth Surface, No Sharp Edges, Comes With English Manual That Contains : Users Guide, List Of Parts, Maintenance Guide, Safety Guide. The Item Must Be Branded, With Dti-bps Certification 1 Year Warranty Parts And Service With Service Centers Located In Major Cities In The Philippines.) 10 Pc Foam, Scrubbing (1. Material: Cellulose And A Scouring Pad On One Side 2. Dimension: Length : 140 - 180 Mm ; Width : 80 - 100 Mm ; Thickness : 12 - 20 Mm 3. The Item Must Be Of Good Quality) 4 Pc Garbage Receptacles (1.bucket / Tub Material : Hard Plastic, (ps) Polystyrene 2.bucket / Tub Color : Any Color 3.capacity (gallons) : 3 Gal. (minimum) Comes With A Cover 4.the Item Must Have Good Quality) 30 Pair Gloves, Rubber (1.heavy-duty Latex-free Vinyl Rubber Gloves 2.thickness : 4 Mil 3.color : Any Color 4.size : Medium 5.other Features: Acid/solvent Resistant. 6.the Item Must Be Of Good Quality) 15 Pc Goggles, Safety (safety Goggles, Clear Polycarbonate - One Piece Lens With 180° Panoramic View, Non-fog Size/dimension: L 17 - 18.5 Cm X W 8 Cm X D 5-7.5 Cm High Impact Resistant, Ansi "z87" Compliant Firm And Comfortable Seal Around Forehead, Cheeks, Nose And Temples Protects Against Splash, Chemicals, Dust Adjustable Head Strap Shall Bear Mark Z87 Embossed Or Engraved Or Etched On The Item. Smooth Surface, No Sharp Edges) 1 Pc Hairdryer( Electric Hairdryer, With Concentrator Nozzle Two Heat Setting And 1 Speed (minimum) Rating : 220/240 Vac, 1200 W (minimum) Body Length Including Nozzle: 20 Cm Folding Handle Design, With Hanging Ring Smooth Surface, No Sharp Edges Branded, Brand Name And Electric Rating Permanently Mark On The Item, With Dti-bps Certification With User's Manual Written In English That Contains Operating Procedure, Parts With Description, Safety Procedure, And Maintenance. With Service Centers Located In Major Cities In The Philippines. 1 Year Warranty(parts & Service) 2 Roll Hose, Water(water Hose Material: Pvc Fiber Reinforced, Three (3) Layers; Any Color; Hose Length: 50 Feet; Hose Diameter: 5/8 Inches; Pressure Capacity: 200 Pounds Per Square Inch (minimum); Fitted With Male And Female Brass Couplers (nh, 11.5 Tpi) For Spray Nozzle No Sharp Edges) 3 Pc Kettle, Electric(electric Kettle Cordless (with Pouring Spout), Hinged Lid, Detachable From And Can Rotate On Its Corded Base Material : Round Stainless Body, Plastic Handle, Lid And Base Capacity : 1.5 To 2 Liter Automatic Shut - Off, With Power Indicator Light Power Rating: 220//240vac, 50/60hz, 1000 -1600 Watts Base With A 50 Cm (minimum) Power Cord, Molded Male Plug To Adapt Type A Outlet (or Providing 10a Plug Adapter Is An Option) Smooth Surface, No Sharp Edges; Dti-bps Certified Comes With English Manual That Contains: Operation Procedure, Maintenance And Safety Guide. The Item Must Be Branded, Brand Name And Electrical Ratings Permanently Mark On The Item.) 5 Pc Laundry Sorter(3 - Bag Laundry Sorter, With Wheels Bag: Polyester, Rectangular Shape, Detachable From Frame With Metal Handle And Hanging Hook Bag Dimensions : Rectangular 22 X 15 X 8 Inch (minimum) Frame Material : Corrosion Resistant Steel, Sturdy No Wobble Frame Overall Dimensions : Rectangular, 31 X 30 X15 Inch (minimum) With Four Casters, 2 Inch Diameter (minimum) Smooth Surface, No Sharp Edges) 2 Pc Light, Emergency(emergency Light, 2 Heads Led Materials: Metal, Anti-rust Coated Duration Time (2 Heads): 5 Hours (minimum) Automatically Light Up During Power Outage Overcharge And Over- Discharge Protection Built - In Ac Charger, Power Cord Plug To Adapt Type A Outlet (or Providing 5a Minimum Plug Adapter Is An Option) Battery Test Switch - External Safety Fuse Head: White Led 1w (minimum) 3.5 " Dome Reflector Power Rating: 220 -240 Vac , 50/60 Hz 20-24 Hours Charge Time Dimensions: Rectangular 27 X 7 X 27 Cm (approx.) Sooth Surface, No Sharp Edges Includes User's Manual In English Which Contains: A. A Diagram Of The Parts With Their Names, B. Operating Procedures On How To Use The Equipment, C. Safety Precautions When Using The Equipment, D. Basic Troubleshooting And Maintenance Procedures The Item Must Be Branded, Brand Name And Electrical Ratings Permanently Mark On The Item.) 2 Pc Mirror Wall Mirror With Frame Flat Glass Mirror, 2 Mm Thick (minimum), Clear With No Distortion Frame: Wood Or Plastic Commercial Finish Rectangular Shape, 3600 Sq.cm (minimum) Includes Mounting Accessories Smooth Surface, No Sharp Edges) 20 Pc Mop (mop, Handle And Mop Head Set, Refillable Head Handle: Aluminum Or Anti-rust Coated Steel, With Hard/stiff Plastic Mop Head Holder, Clip Type With Tightening Knob Overall Handle Dimension: 130 X 19 Cm (minimum) Mop Head: Cotton Thread/yarn, Sewn Tailband, L 34 X 16 X 4 Cm (minimum), White Handle: Plated Steel Tube Or Wood, Length : 40 (minimum), No Sharp Edges 1 Set Polisher, Floor, Electric, With Accessories(electric Floor Polisher With Accessories Material: Stainless Steel, Aluminum Alloy Handle: Stainless Tube, Adjustable Height 1 Meter Long (approximate), With Dual Switch Lever Size/capacity :13 Inch (minimum) Diameter Power Supply: 220/240 Vac, 50/60 Hz. Power: 1/3 Hp (minimum) Rotation Speed : 160 Rpm (minimum) Heavy Duty (royal) Power Cord Length : 12 Meters (minimum) With Type A Plug (or Providing 10a Plug Adapter Is An Option) With Pair Of Rubber Wheels, Smooth Surface, No Sharp Edges Comes With Pad Holder, 2 Pcs - Polishing Brush And 3 Pcs - Floor Polishing Pads Includes User's Manual In English Which Contains: A. A Diagram Of The Parts With Their Names, B. Operating Procedures On How To Use The Equipment, C. Safety Precautions When Using The Equipment, D. Basic Troubleshooting And Maintenance Procedures Branded, Brand Name And Electric Rating Permanently Mark On The Item, With 1 Year Warranty Parts And Service The Offered Brand Of The Item Must Be An International Brand With At Least 5 Years Presence At The Local Market And Global Presence In The Usa, Europe Or In Japan Market.) 5 Pc Shelving(shelving, Open, Knockdown Type, Adjustable Shelves Metal Powder Coated Frame Number Of Shelves : 5 Overall Dimensions : 85 X 30 X 180 Cm(minimum) Sturdy Connection, No Wobble Smooth Surface, No Sharp Edges) 5 Pc Sign, Caution(caution Sign, A Shape-2 Panel Self Standing, With D-handle, Collapsible For Easy Storage Material : High Impact Plastic, Panel Dimension : Rectangular (lxw) 55-65 Cm X 25 X 61 0m (minimum), Panel Depth : 2 Cm (minimum) Color : Yellow Print Description : "caution: Wet Floor" On One Side "cleaning In Progress On The Other Side, Both Messages Provided With Graphics Printed In Black. Font Size: 100 -120 Mm X 50 -70 Mm, Arial Smooth Surface, No Sharp Edges) 10 Pc Sponges, Dish(dish Sponge, Cellulose, Non-scratch Dimensions : 5 X 3 X 1 Inch (minimum) Branded) 10 Pc Spray Gun, Water(barber/salon Spray Gun Material: Hdpe Transparent Plastic Capacity: 300 Ml.(minimum) Trigger Type Sprayer Dimension: Diameter :7 Cm. X Height: 16.3 Cm (minimum) Rotating Nozzle To Adjust Spray Patterns Smooth Surface, No Sharp Edges Must Be Branded) 10 Pc Squeegee(squeegee, Short Handle Head/blade Material: Stainless, Rubber Handle: Plastic Or Stainless Steel Blade Length: 25 - 30 Cm Overall Length (handle And Head) 20 - 32 Cm No Sharp Edges ) 5 Pc Squeezer, Mop(mop Bucket With Squeezer/wringer And Wheels Hand Lever To Squeeze, Made Of Metal, With Hand Grip Material : Hard Plastic, (ps) Polystyrene Or Its Equivalent Capacity : 30 L (minimum) Overall Dimension (excluding Handle: ( L X W X H ) 40 X 27 X 57 Cm (minimum) Color : Yellow With 3 Inches Non-marking Rubber Casters "caution" Printed In Black On Both Sides Of The Mop Bucket Smooth Surface, No Sharp Edges) 1 Pc Step Ladder(material: Aluminum U Channel Capacity: 250 Lbs (minimum) Type: Flatform Type Number Of Step: 6 (including Top Step) Reach Height: 6 To 8 Feet(minimum) Width: 15 Inches Minimum Spread: 4 Feet (minimum) Twin Steps With Gripped Treads To Prevent Slipping Step Braces On Top And Bottom Step Heavy Duty Aluminum Foot Bracket With Slip-resistant Foot Pad With User's Manual In English Which Includes: A. Parts Manual With Labels, B. Assembly Instructions, Brandedfeet(minimum) Width: 15 Inches Minimum Spread: 4 Feet (minimum)) 2 Pc Vacuum Cleaner, Dry And Wet(electric Vacuum Cleaner, Wet And Dry Function, Sucks Even Screws, With 4 Swivel Caster Wheels Material : Hard Plastic, (abs) Or Rust Proof Body Equivalent Power Supply : 220/240vac, 50/60hz, 1000 Watts (minimum) Auto Shut Off Tank Capacity : 20 Liters (minimum) Equipped With Complete Accessories I.e., Detachable Vacuum Hose Assembly (flexible Non-kink), Extension Tubes/wands, Carpet (long Square) Brush Nozzle, Wet And Dry Floor Brush Nozzle, Crevice Nozzle, Hepa Filter, Sponge Filter/washable Cloth Bag. Comes With 4 Meters (minimum) Heavy Duty (royal) Power Cord, Molded Male Plug To Adapt Type A Outlet (or Providing 10a Plug Adapter Is An Option) Smooth Surface, No Sharp Edges With User's Manual Written In English That Contains Operating Procedure, Parts With Description, Safety Procedure, And Maintenance. The Item Must Be Branded, Brand Name And Electric Rating Permanently Mark On The Item. 1 Year Warranty Parts And Service With Service Centers Located In Major Cities In The Philippines. The Offered Brand Of The Item Must Be An International Brand With At Least 5 Years Presence At The Local Market And Global Presence In The Usa, Europe Or In Japan Market.) 1 Unit Washer, Laundry(1. Front Load Electric Washer, Laundry 2. Electronic Control, Digital Indicator Display , Transparent Glass Door 3. Body Material : Steel, Powder Coated, Any Color 4. Dimensions (wxdxh): 590 Mm (minimum) X 490 Mm (minimum) X 820 Mm (minimum) 5. Drum Material : Stainless Steel 6. Capacity : 8 Kg (minimum) 7. Spin Speed : 1200 Rpm (minimum) 8. Power Rating: 220 /240vac, 50/60 Hz. 9. Comes With A 1 Meter (minimum) Heavy Duty Power Cord With Male Plug To Adapt Type A Outlet (or Providing 20a Plug Adapter Is An Option) 10. Smooth Surface, No Sharp Edges 11. With Dti-bps Certification, Brand And Electrical Ratings Clearly And Permanently Mark On The Item 9.includes User's Manual In English Which Contains: A. A Diagram Of The Parts With Their Names, B. Operating Procedures On How To Use The Equipment, C. Safety Precautions When Using The Equipment, D. Basic Troubleshooting And Maintenance Procedures 12.the Item Must Be Branded, Dti-bps Certified, 1 Year Warranty Parts And Service 13. With Service Centers Located In Major Cities In The Philippines. 14.the Offered Brand Of The Item Must Be An International Brand With At Least 5 Years Presence At The Local Market And Global Presence In The Usa, Europe Or In Japan Market.) 2 Pc White Board(white Board, Floor Standing, Rolling Board: White Formica Laminated, Plane Will Not Deform. Board Size: Rectangular 1800mm W X 1000 To 1200mm H, Board Edges Secured With Aluminum Clip Edging 17 Mm (minimum) Wih Plastic Corner Caps Comes With Metal Tray For Marker And Eraser The Stand And Frame Are Constructed With Aluminum Or Powder Coated Steel 25mm Square Tube (minimum), Sturdy, No Wobble With 4 Lockable Hard Plastic Caster Wheels Overall Height From Floor: 210 To 214cm Smooth Surface, No Sharp Edges) Lot 7. Tangub City National High School (food And Beverage Services Nc Ii) Php 571,245.00 50 Pcs Chair, Dining Type : Dining Side Chair Body Shape: Square Material : Metal (round Or Square) Dimesion: Total Height - 33" X 15" X15" (minimum) Capacity: 150 Kg. Black Colored Powder Coated Frame With Foam On Seat Packed In Carton Box The Item Must Have Good Quality 4 Pcs Coffee Pot, 2 Pints Type: Manual Drip Body Shape: Round Material : Stainless Steel With Cover Capacity : 2 Pints Outside Diameter : 90 -110 Mm Over-all Height : 200 - 230 Mm Thickness : 0.5 - 1 Mm With Handle And Spout Packed In Carton Box The Item Must Have Good Quality 6 Pcs Container, Creamer Design: Type: Porcelain With Spout Body Shape: Circular Material: Porcelain Diameter : 50 - 65 Mm Height : 80 - 105 Mm Color : White Appearance : Glossy White Packed In Carton Box The Item Must Have Good Quality 24 Set Cups Ans Saucers 5-6 Oz. 1. Material : Porcelain 2. Capacity : 5 Oz./140 Ml 3. Heatproof Up To 300 Deg. C 4. Color : White 5. The Item Must Be Of Good Quality 6. Packed In Carton Box 10 Pcs Folder, Menu Type: Leather Menu Folder Body Shape: Rectangular Material: Leather With 2 Partitions And 6 Inserts Size: 31.5cm X 24.5cm Color: Brown/black Applicable Paper Size: A4 50 Pcs Fork, Cocktail 1. Material/appearance: Stainless Steel, Highly Polished, W/ Plain Design 2. Type : Rounded Tip Handle 3. Over-all Length : 110 - 165 Mm 4. Width : 20 - 30 Mm (minimum) 5. Handle Thickness : 2 Mm To 4 Mm 6. Handle Length : 75 - 90 Mm 7. Small, 8. Color : Silver 9. The Item Must Be Branded And Have Good Quality. 50 Pcs Fork, Dessert Type : Dessert Fork Body Shape: Fork Shape, Round Tip Material/appearance : Stainless Steel, Highly Polished,with Plain Design, Rounded Tip Handle Length : 150 Mm - 175 Mmwidth : 20 - 30 Mmhandle Thickness : 1.5 Mm - 3 Mm Number Of Tines : 4 Handle : 130 Mm (minimum) Color : Silver Packed In Plastic Pouch The Item Must Be Of Good Quality 60 Pcs Fork, Dinner Type: Dinner Fork Body Shape: Fork Shape Material / Appearance : Stainless Steel, Highly Polished, With 4 Tines Over - All Length : 120 - 175 Mm Thickness Of Handle : 2 - 3 Mm Color : Silver Packed In Plastic Pouch The Item Must Be Of Good Quality 36 Pcs Fork, Fish Type : Fish Fork Body Shape: Fork Shape With Round Tip Material / Appearance : Stainless Steel, Highly Polished, With Plain Design Over-all Length : 180 - 215 Mm Fork Width : 1.5 Mm - 3 Mm Fork Thickness : 1 Mm - 2 Mm Number Of Tines : 4 Length Handle : 120 - 130 Mmhandle Thickness : 2 Mm - 3 Mm Color : Silver Packed In Plastic Pouch The Item Must Be Of Good Quality 36 Pcs Fork, Oyster Type: Oyster Fork Body Shape: Fork Shape Material: Stainless Steel, With High Polish Appearance, And With Plain Design Length: 90 - 120 Mm Thickness: 1 Mm - 3 Mm Silver Color With Three Short Wide Curved Tines Packed In Plastic Pouch The Item Must Be Of Good Quality 24 Pcs Glass, Champagne Flute Type : Flute Glass Body Shape: Round Material: Clear Crystal Glass Dimension : Height: 20 -24 Cm, Top Diameter: 50 -70 Mm, Bottom Diameter: 60 - 80 Mm Capacity: 250 Ml. (minimum) Thickness: 1.5 - 3 Mm Packed In Carton Box The Item Must Have Good Quality 36 Pcs Glass, Collins Type: Tumbler Body Shape: Round Material : Clear Glass Capacity : 10 Oz To 14 Oz Thickness : 1.5 -3 Mm (minimum) Packed In Carton Box The Item Must Have Good Quality 36 Pcs Glass, Juice/hi-ball 1. Material : Clear Glass 2. Type : Hi-ball 3. Height : 140 - 160 Mm 4. Bottom Diameter : 50 -70 Mm 5. Top Diameter : 50 - 70 Mm 6. Thickness : 2 - 4 (minimum) 7. Capacity : 8 Oz. To 10 Oz. 8. Diswasher Safe 9. The Item Must Be Branded And Good Quality 10. Packed In Carton Box 36 Pcs Glass ,pilsner(ice Tea Glass) Type:falired Rim,body Shape:round Slender Bowl,material:clear Glass Capacity:20 0z To 23 Oz With Flaired Rimand Slender Shape Packed In Carton Box.the Item Must Have Good Quality. 36 Pcs Glass, Red Wine Type: Royalty Body Shape: Balloon Shaped Bowl Material: Crystal Clear Glass Rim Diameter : 55 - 60 Mm Thickness : 1.5 Mm - 3 Mm Over - All Length : 200 -220 Mm Capacity : 250 -300 Ml Stem Diameter : 6 - 8 Mm Stem Length : 85 - 90 Mm Base Diameter : 75 - 85 Mm Base Thickness : 2 - 4 Mm 40 Pcs Glass, White Wine Type: Royalty Body Shape: Balloon Shaped Bowl Material: Crystal Clear Glass Rim Diameter : 55 - 60 Mm Thickness : 1.5 - 3 Mm Over -all Length : 200 -220 Mm Capacity : 270 - 300 Ml Stem Diameter : 6 - 8 Mm Stem Length : 75 - 85 Mm Base Diameter : 70 - 80 Mm Base Thickness : 2 - 5 Mm 4 Pcs Gravy Boats Type: Steel Type Body Shape: Boat Shape With Handle Material: Stainless Steel Capacity : 5 Oz. Appearance: Mirror Polish Finish Size :17cm X 7.3cm X 8.2 Cm / 6.7 X 2.9 X 3.2 Inches (minimum) The Item Must Have Good Quality Packed In Plastic Pouch 4 Pcs Ice Bucket, 2 Liters With Tongs Type: Steel Type Body Shape: Circular Set Includes: A. Ice Bucket Material : Stainless Steel Diameter : 140 - 180 Mm Height : 140 - 170 Mm Thickness Of Bucket : 0.7 - 2 Mm Capacity : 2 Liters (minimum) The Item Must Have Good Quality 24 Pcs Knife, Butter 1. Material : Stainless Steel W/ Highly Polished Appearance 2. Over-all Length : 140 Mm - 150 Mm 3. Handle Thickness : 3 Mm - 5 Mm 4. With Dull Edge And Rounded Tip 5. The Item Must Have Good Quality. 6. Packed In Carton Box 24 Pcs Knife, Dinner Type: Dinner Knife Body Shape: Flat With Round Tip Material / Appearance : Stainless Steel Blade Highly Polished Handle Material : Stainless Steel Overall Length : 160 - 190 Mm Blade Thickness : 2 - 4 Mmhandle Thickness : 3 - 6 Mm Serrated Blade With Rounded Tip Packed In Carton Box The Item Must Have Good Quality 24 Pcs Knife, Fish Type : Fish Knife Body Shape: Flat With Pointed Tip Material / Appearance : Stainless Steel, Highly Polished W/ Plain Design Overall Length : 200 - 220 Mm Width Blade : 20 - 25 Mm Thickness Of Blade : 2 Mm - 4 Mm Thickness Of Handle: 3 Mm - 6 Mm Wide Blade, Dull Edge, Tip Made With A Notched Point Color : Silver Packed In Carton Box The Item Must Have Good Quality 20 Pcs Napkin Holder (stainless) Type: Steel Type Body Shape: Rectangular Material : Stainless Steel With Highly Polished Appearance Dimension : Width : 70 - 90 Mm X Length : 150 - 170 Mm , Thickness : 0.7 Mm -2 Mm Packed In Plastic Pouch The Item Must Have Good Quality 20 Pcs Order Pads Type: Numbered Pads Body Shape: Rectangular Material : 80 Gsm Offset Paper Each Pad Comes With A 100 Sheets And Corresponding Copy Page Each Pad Has Sequentially Numbered Orders To Make It Easy To Keep Track With 100 Sheets Per Pad And 10 Pads Included Can Take 1000 Orders Before You Run Out Packed In A Plastic Pouch 12 Pc Pepper And Salt Mill Type: Pepper & Salt Mill Body Shape: Round Body Material: Wood Size: Diameter: 5 Cm X Height: 20 Cm (minimum) Carved Of Wood With Stainless Steel Grinding Mechanism Color: Natural Screw Cap At The Top Of The Mill To Adjust The Thickness Of Peeper Or Spices Preferably With A Packing Case Food Grade And Nontoxic Must Be Branded 50 Pc Plate Covers Type: Steel Type Body Shape: Circular Material: Stainless Steel, Mirror Polished Diameter: 10 1/4 Inches (minimum) Height: 2 7/8 Inches (minimum) Thickness: 1/16 Inch. (minimum) With Handle Packed In Plastic Pouch The Item Must Have Good Quality 50 Pc Plate, Dessert, 7" To 8" Type: Plain Type Body Shape: Circular Material: Porcelain Supply Must Be A Set, Consisting Of One (1) Of Each: 7 Inches And 8 Inches Plates Color : White Inner Diameter: 145 To 165 Mm Thickness : 3 To 6 Mm Smooth And Glossy Surfaces Packed In Carton Box The Item Must Have Good Quality 60 Pc Plate, Dinner, 10" Type: Plain Type Body Shape: Circular Material: Porcelain With No Design Color: White Inner Diameter : 200 Mm - 215 Mm Outer Diameter : 250 - 260 Mm Thickness : 3 Mm - 6 Mm Smooth And Glossy Surfaces Packed In Carton Box The Item Must Have Good Quality 50 Pcs Plate, Fish, 8" To 9" Type: Plain Type Body Shape: Circular Material : Porcelain With No Design Supply Shall Be A Set Consisting Of: One (1) Each 8 Inches And One (1) Each, 9 Inches Color : White Inner Diameter : 165 Mm - 190 Mm (minimum) Thickness : 3 Mm - 6 Mm Smooth And Glossy Surfaces Packed In Carton Box The Item Must Have Good Quality 10 Pcs Round Table (8's) Type: Foldable Body Shape: Round Material: High Density Polyethylene Table Top Powder Coated Steel Frame Size: 154cm X 74cm X4.5cm (minimum) Good For 8 To 10 Seater Capacity Tube Size : 28 Mm Diameter X 1 Mm Thickness Packed In A Carton Box The Item Must Have Good Quality 50 Pcs Salad Forks Type: Salad Fork Body Shape: Fork Shape Material/appearance: Stainless Steel, Highly Polished, With 4 Tines Length: 150 Mm - 175 Mm Thickness Of Handle : 2 Mm - 3 Mm Color: Silver Packed In Plastic Pouch The Item Must Be Of Good Quality 50 Pcs Salad Knife Type: Salad Knife Body Shape: Semi Rectangular Blade With Pointed Tip Material/appearance: Stainless Steel, Highly Polished, W/ Plain Design Overall Length: 145 -160 Mm Blade Thickness: 2 Mm To 4 Mm Handle Thickness: 4 Mm To 6 Mm Handle Material: Stainless Steel Rounded Tip Handle Packed In Carton Box The Item Must Have Good Quality 50 Pcs Salad Plates 7" To 8" Type: Plain Type Body Shape: Circular Material: Porcelain With No Design Supply Must Be A Set Consisting Of One (1) Each: 7 Inches And 8 Inches Plates Color: White Diameter (inner): 150 Mm - 165 Mm Thickness: 3 Mm - 6 Mm Smooth And Glossy Surfaces Packed In Carton Box The Item Must Have Good Quality 20 Pcs Salt And Pepper Shakers Type: Glass Type Body Shape: Square Material: Glass And Aluminum Over-all Height: 75 -90 Mm Length: 50 -60 Mm Width: 50 -60 Mm Aluminum Cover Packed In Carton Box The Item Must Have Good Quality 25 Pcs Sauce Laddles Type: Spouted Bowl Body Shape: Circular With Pouring Spout Material: Stainless Steel, Highly Polished Appearance Over-all Length: 220 -230 Mm Ladle Bowl Length: 60 -65 Mm Long Ladle Bowl Diameter: 65 -70 Mm Depth: 10 -15 Mm Handle Details: 150-155 Mm Long X 20 -30 Mm Wide X 2 - 4 Mm Thick Color: Silver With Hang Hole For Hanging And Easy Access Dishwasher Safe Packed In Plastic Pouch The Item Must Have Good Quality 50 Pcs Server, Cake 1. Material : Stainless Steel Blade , Highly Polished Appearance 2. Over-all Length : 220 To 270 Mm 3. Width : 60 - 80 Mm 4. Thickness : 1.5 Mm To 2 Mm 5. Handle : 120 -140 Mm Long, Non-toxic Plastic 6. Shape : Shovel-shaped 7. Color : Silver 8. The Item Must Have Good Quality 9. Packed In Carton Box 50 Pcs Service Forks Type : Service Fork Body Shape: Fork Shape Material/appearance: Stainless Steel, Highly Polished, W/ Palin Design Over-all Length: 220 Mm - 260 Mm Width: 20 - 25 Mm Handle Thickness: 1.5 Mm - 4 Mm Handle Length - 165 Mm - 185 Mm 4 Tines Color: Silver Packed In Plastic Pouch 25 Pcs Service Tray Type: Plastic Body Shape: Rectangular Material: Plastic (pp) Size : 14 Inches X 18 Inches X 1 Inch (minimum) Color : Any Packed In Plastic Pouch The Item Must Have Good Quality 25 Set Show/service/base Plates 11" To 14" Type: Plain Type Body Shape: Round Material: Porcelain With No Design Supply Must Be A Set Consisting (1) Of Each: - 11 Inches, - 12 Inches, - 13 Inches, And - 14 Inches Plates Color: White Diameter, Inner : 225 Mm - 250 Mm Thickness: 3 Mm - 6 Mm Smooth And Glossy Surfaces 50 Pcs Side Plates Or Bread Plates 6'' Type: Plain Type Body Shape: Round Material: Porcelain With No Design Color: White Inner Diameter: 95 Mm To 120 Mm Outer Diameter: 145 Mm To 170 Mm Thickness : 3 Mm - 6mm Smooth And Glossy Surfaces Packed In Carton Box The Item Must Have Good Quality 50 Pcs Side Towels Type: Chef's Towel Body Shape: Rectangular Material: Oxford Polyester Soft Cloth Over-all Length : 640 - 680 Mm Over-all Width : 420 -460 Mm Color : Plain White Packed In Plastic Pouch The Item Must Have Good Quality 25 Pcs Silver Platter Type: Steel Type Body Shape: Round Material: Stainless Steel Diameter: 300 -330 Mm Thickness: 1 - 2 Mm Packed In Plastic Pouch The Item Must Have Good Quality 50 Pc Soup Bowl Type: Plain With Two Handles Body Shape: Circular Material : Porcelain Capacity : 24 Oz. (minimum) Packed In Carton Box The Item Must Have Good Quality Packed In A Carton Box 25 Pc Soup Laddle Type: Steel Type Body Shape: Circular Material: Stainless Steel, Highly Polished Appearance Over-all Length : 220 -235 Mm Ladle Bowl Details : 60 -65 Mm Long, 60 -75 Mm Diameter, 10 -15 Mm Deep Handle Details : 145 - 155 Mm Long X 12 - 25 Mm Wide X 1.5 -3 Mm Thick Color : Silver With Hang Hole For Hanging And Easy Access 15 Pc Soup Tureen Type: Steel Body Shape: Round Material: Stainless Steel Capacity: 7 - 11 Quart Size : 60 X 35 X 32 Cm (minimum) Packed In Plastic Pouch The Item Must Have Good Quality 100 Pc Spoon, Dinner Type : Dessert Spoon Body Shape: Oval Material/appearance: Stainless Steel, Highly Polished With Plain Design Over-all Length : 175 To 190 Mm Thickness : 2 Mm - 3 Mm Shorter Handle : 120 -130 Mm Color : Silver Packed In Plastic Pouch The Item Must Have Good Quality 100 Pc Spoon, Dessert Type : Dessert Spoon Body Shape: Oval Material/appearance: Stainless Steel, Highly Polished With Plain Design Over-all Length : 175 To 190 Mm Thickness : 2 Mm - 3 Mm Shorter Handle : 120 -130 Mm Color : Silver Packed In Plastic Pouch The Item Must Have Good Quality 100 Pc Spoons, Service Type : Service Spoon Body Shape: Oval Material: Stainless Steel, Highly Polished, W/ Plain Design Over-all Length: 220 Mm - 250 Mm Width: 30 - 38 Mm Handle Thickness: 1.5 Mm - 4 Mm Handle Length - 165 Mm - 185 Mm Color: Silver Packed In Plastic Pouch The Item Must Have Good Quality 100 Pc Spoons, Soup (cream And Cosume) Type: Soup Spoon Body Shape: Round Material/appearance : Stainless Steel, Highly Polished, W/ Plain Design, Rounded Tip Handle Over-all Length : 165 Mm - 200 Mm Smaller Oval Shaped Spoon Bowl And Tapers Slightly To The Tip Shorter Handle : 110 Mm - 170 Mm Thickness : 1.5 Mm - 3 Mm Color : Silver Packed In Plastic Pouch 50 Pc Steak Knife Type: Steak Knife Body Shape: Flat With Serrated Edge Material: Stainless Steel Steel Blade With Wooden Handle Length: 170 Mm To 203 Mm Handle Wood Thickness: 10 - 14 Mm With Serrated Blade Packed In Carton Box The Item Must Have Good Quality 25 Pc Sugar Container Type: Glass Type Body Shape: Round Material: Glass With Brass Lid (or Equivalent) Diameter: 70 -80 Mm Height: 130 -140 Mm Capacity: 12 Oz. Packed In Carton Box The Item Must Have Good Quality 50 Pc Table Cloth, 54 X 54 Inches Type: Plain Cloth Body Shape: Square Material: Oxford Polyester Cloth Color: Plain White Dimension: L 54 Inches X W 54 Inches (minimum) Packed In Plastic Pouch The Item Must Have Good Quality 100 Pc Table Cloth, Rectangular Type: Plain Cloth Body Shape: Rectangle Material : Linen Size : 120cm X160cm (minimum) Color : Any Color But Not Black Feature: Washable Packed In A Plastic Pouch 100 Pc Table Napkins, Cloth, 16"x16" Type: Plain Cloth Body Shape: Square Material: Oxford Polyester Cloth Or Its Equivalent Size: L 16 Inches X W 16 Inches (minimum) Color: Plain White Packed In Plastic Pouch The Item Must Have Good Quality 80 Pcs Table Skirting Cloth 90" To 90" Type: Plain Cloth Body Shape: Square Material: American Cotton Twill Cloth Color: Any Color Except Black Dimension: 90 Inches X 90 Inches (minimum) Packed In Plastic Pouch The Item Must Have Good Quality 50 Pcs Table, Square/rectangular (4's Or 6's) Type: Foldable Plastic Body Shape: Square/rectangle Material: High Density Polyethylene Table Top Powder Coated Steel Frame Dimension: 37 - 39 X 37 - 39 Inches Color: White Good For 4 Persons Packed In Carton Box The Item Must Have Good Quality 20 Pcs Tea Pot, 2 Pints Type: Porcelain Type Body Shape: Round With Handle And Pouring Spout Material : Porcelain Capacity : (2 Pint) Color : White Packed In Carton Box The Item Must Be Of Good Quality 50 Pcs Teaspoon Type : Tea Spoon Body Shape: Oval Tip Material/appearance: Stainless Steel, Highly Polished, W/ Plain Design Over-all Length: 120 Mm To 140 Mm Handle Thickness: 2 Mm To 4 Mm Short Handle Length - 100 Mm (minimum) Color: Silver Packed In Plastic Pouch The Item Must Have Good Quality 15 Pcs Tong, 8 Inches Type: Tong, 8 Inches Body Shape: Standard Material: Stainless Steel Size: 8 Inches Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Tongs Lock Closed For Storage Preferably With A Packing Case Food Grade And Dishwasher-safe Must Be Branded 30 Pcs Tooth Pick Holder Type: Steel Type Body Shape: Round Material: Stainless Steel, Highly Polished In Appearance Diameter: 30 -35 Mm Diameter (minimum) Height: 65 -75 Mm Capacity: 1.24 Oz. (minimum) Packed In Plastic Pouch The Item Must Have Good Quality 20 Pcs Tray Stand Type: Foldable Body Shape: Rectangular Material: Chrome Plated Metal Folding Tray Stand Length: 470 -490 Mm Width: 400 -440 Mm Height: 770 -790 Mm Packed In Plastic Pouch The Item Must Have Good Quality 30 Pcs Tray, Bill Folders/change 1. Material : Heavy Duty Plastic ( Abs ) Or Its Equivalent 2. Height : 190 - 220 Mm 3. Width : 120 -140 Mm 4. Thickness : 2 Mm To 3 Mm (minimum) 5. Color : Black 6. With Check And Pen Holder 7. The Item Must Have Good Quality 8. Packed In Plastic Pouch 20 Pcs Tray, Round (bar) Type: Plastic Body Shape: Round Material: ( Pe/abs) Plastic Rubberized Surface, Non-slip/grip Tight Over-all Diameter: 345 -360 Mm (minimum) Thickness: 2 - 4 Mm (minimum) Color: Black Packed In Plastic Pouch The Item Must Have Good Quality 50 Pcs Water Goblet Type: Water Goblet Body Shape: Balloon-shaped Bowl Material: Crystal Clear Glass Over-all Length: 200 -220 Mm Capacity: 270 Ml To 300 Ml Rim Diameter - 55 -65 Mm Thickness: 1 Mm To 3 Mm Stem Length : 75 -85 Mm Stem Diameter : 6 -8 Mm Base Thickness : 3 -4 Mm Base Diameter : 7 -80 Mm Packed In Carton Box The Item Must Have Good Quality 30 Pcs Water Pitcher (stainless) Type: Steel Type Body Shape: Circular Material: Stainless Steel, Highly Polished Appearance Height: 170 Mm To 220 Mm Top Diameter: 110 -120 Mm (approximate) Capacity: 1 - 1.5 Liter With Pour Spout Dishwasher Safe Packed In Plastic Pouch The Item Must Have Good Quality Lot 8. Tangub City National High School (front Office Services And Local Guiding Services) Php 232,832.00 50 Pcs Calculator Type: Simple Calculator, Non Scientific Body Material: Hard Plastic Minimum Size: 110mm Width X 140mm Long Lcd Display: At Least Font Size Is 8mm X 5mm With Dual Power; Solar Cell And Battery With At Least 8 Digits Display Includes Spare Battery Packed With Protective Carton Box User's Manual In English Which Includes: A. Parts Manual With Labels, B. Assembly Instructions C. Operating Procedures On How To Use The Equipment, 1 Pcs Cart, Bell Boy Type:hotel Luggage Trolley Capacity: At Least 450 Kilograms Minimum Dimensions: Length - 1000mm X Width - 600mm X Height - 1700mm Frame Material: Stainless Steel Tubing Stainless Tube Diameter: At Least 35mm Black Powder Coated Steel Platform With Carpeted Surface And Rubber Bumper At The Edge With 4 Pieces X 200mm Diameter Black Pneumatic Swivel Wheels Packed With Shipping Carton Box Branded 1 Pcs Cash Register With Drawer Printer: Width: 57mm (minimum) Speed: 2 Lines/sec (minimum) Lcd Display Size: 5cm Width X 10cm Long(minimum) With Drawer At Least 4 Bills And 5 Coins Compartments With Drawer Dimension At Least 410mm Width X 450mm Depth Input Method: Numeric 10-key Interface With At Least 2 Ports Power Source: 220-240volts Ac, 50/60hz; With Ac/dc Adapter Can Be Operated With Battery Programmable User's Manual In English Which Includes: A. Parts Manual With Labels, 1 Pcs Credit Card Imprinter Height Of The Imprinter 2 1/2 Inch (minimum) X Width 5 1/2 Inch (minimum) X Length 11 Inches (minimum) Carriage Material: Steel Body:plastic Color: Black 20 Characters Per Line Card Mounting Can Accepts At Least 0.030" Thick Size Credit Cards Plate Can Accommodate Up To 5 Lines, Manual Type With User's Manual In English Which Includes: A. Parts Manual With Labels, B. Assembly Instructions, C. Operating Procedures 30 Pc Credit Card Voucher Holder Material: 3 Mm Thick Clear, Acrylic, Dimensions: Height: At Least 255 Mm, Width: At Least 210 Mm, Thickness: At Least 70 Mm 1 Pcs Detector, Fake Bills Led Display; Led Display Size: At Least 5 Cm Width X 10 Cm Long; Hard Plastic Casing; Ultraviolet (uv) And Magnetic (mg) Sensors; Power Source: Built In Rechargeable Battery,12v Output And Ac 100- 240v Adapter; With Complete Detection; Accessories Includes: Tough Plastic Carrying Case, Power Cord, Cleaning Brush, And Power Charger; User's Manual In English Which Includes: A. Parts Manual With Labels, B. Assembly Instructions, 3 Pcs Guest Folio Rack Material: Hard Plastic; Accommodates At Least 50 Room Divider Indexes; With Divider Boards With Metal Tabs; A4 Size Divider; With Metal Sidings 1 Pc Hypercom Memory: 1 Mb Ram (minimum) Lcd Display; 160 X 80 Pixel Graphics (minimum) With Card Reader Magnetic Stripe Pin Pad Port: 4-wire, Rs485; With Peripheral Ports For Pc Connection; Electronic Cash Register Or Journal Printer; With At Least 2400bps Modem; Support Synchronous (sdlc) And Asynchronous, Lan Operation; With Pin Encryption; With Thermal Printer At Least 576 Dots Per Line; Thermal Paper – 2 Inches Wide X 3 Inches Roll Diameter (min.); Keypad: Membrane, 12 Keys, Water-resistant; 1 Pc Key Card Maker With Verifier Set Of Hotel Door Lock System With Management Software; A) 1 Unit - Card Type Door Lock With Inductive Distance At Least 4cm B) 1 Unit - Card Encoder Unit With 25 Pieces Door Room Key Cards Computer Software System For Door Lock And Making Cards With Complete Accessories Including The Usb Type A Cable Interface To The Computer User's Manual In English Which Includes: A. Parts Manual With Labels, B. Assembly Instructions C. Operating Procedures On How To Use The Equipment 1 Pcs Key Rack Rack Material: Wood Number Of Racks: Can Accommodate At Least 40 Key Cards Minimum Rack Size: 70mm Width X 110mm Height Depth Of The Rack At Least 50mm Any Color Paint Type:wall Mounted Rack Pack With Shipping Carton Box 1 Pc Safety Deposit Box Vault Material: Metal, Powder Coated, Solid Steel Door Thickness: 4mm(minimum) Body Thickness: 2mm(minimum) Minimum Outer Dimension: L: 30cm X H: 20cm X W: 20cm Electronic Lock System Battery Operated Digital Panel: Requires 4 X ‘aa’ Batteries User's Manual In English Which Includes: A. Parts Manual With Labels, B. Assembly Instructions, C. Operating Procedures On How To Use The Equipment, Branded 20 Pcs Speaker, Lapel Frequency At Least 500mhz With Audio Input Connector With Operation Range At Least 50meters Receiver/70ma Earphone Output Level: 32ohm, 65mw Operates With Energizer Battery With Minimum Powerconsumption Of Transmitter At Least 3v/70ma Receiver: 3v/70ma 25 Sets First Aid Kit Type: Emergency Case; Contents: First Aid Quick Reference Guide, 1pc; Sterize Gauge Swab(4 X4 X12 Ply) 100 Pcs/pack, 1 Pack; Adhesive Strips/band -aid, 50 Pcs/pack, 2 Packs; Gloves, Disposable, Medium Size, 2 Pairs; Hypo Allergenic Adhesive Tape, 5cm X 5cm, 2 Rolls; Triangular Bandage/arm Sling, Min 90cm X 90cmx 120cm, 2pcs; Safety Pins, 1 1/4 Inches, (12 Pcs), 1 3/4 Inches (12 Pcs); Stainless Steel Bandage Scissors, 2pcs; Betadine, 60ml, 2 -3 Years Expiration, 2 Bottles; Dust Mask, 2pcs; Hand Towels Or Face Towels, White Color, 6 Pcs; Gauze Bandage, Minimum 5cm X 4cm, 2 Rolls; Antiseptic Handwash/germicidal Soap, 60 Gms , 2pcs; Torniquet, 2 Pcs; Spirit Of Ammonia, 30ml, 2-3 Years Expiration, 1 Bottle; Burn Cream Ointment, 20g To 30g, 2- 3years Expiration, 1 Tube; Medical Tweezers Min. 8cm, Plastic, 2pcs; Plastic Bags, Resealable, Minimum Of 24pcs, 100mm X 180mm, 24pcs, 150mm X 230mm Cotton Balls , 50 Balls In A Sealed Package, 2 Packs Hot And Cold Pack, Reuseable, 1 Pack Water Resistant And Sturdy Case W/ Handle That Can Accommodate All The Listed Items. 4 Pcs Megaphone Battery Operated (4 Pcs - Size D Battery) With Built-in Siren Power Output: 20-watts (minimum) Range: 700 Meters (minimum) With Hand Grip And Carrying Strap Branded With Users Manual That Contains The Specification, List Of Parts, Instruction Guide, Troubleshooting, Safety Instruction. 100 Pcs Whistle Anodized Aluminum;size : Length - 6.5cm X 3cm Diameter; Handy And Lightweight; Loud Whistle Can Be Heard For Far Distance Of 100 Meters; With Key Ring For Attachment 2 Pcs White Board, Floor Standing, Rolling Board: White Formica Laminated, Plane Will Not Deform.board Size: Rectangular 1800mm W X 1000 To 1200mm H, Board Edges Secured With Aluminum Clip Edging 17 Mm (minimum) Wih Plastic Corner Capscomes With Metal Tray For Marker And Eraserthe Stand And Frame Are Constructed With Aluminum Or Powder Coated Steel 25mm Square Tube (minimum), Sturdy, No Wobblewith 4 Lockable Hard Plastic Caster Wheelsoverall Height From Floor: 210 To 214cmsmooth Surface, No Sharp Edges Total Abc 3,978,106.00 2. The Department Of Education – Division Of Tangub City Now Invites Bids For The Above Procurement Project. Second Procurement Of Learning Tools And Equipment For Technical Vocational Livelihood To Deped-public Schools. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information From Department Of Education – Division Of Tangub City And Inspect The Bidding Documents At The Address Given Below From 8:00 A.m. To 5:00 P.m. , Mondays To Fridays Except Holidays. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 8, 2025 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of: Lot 1 - Five Hundred Pesos (p500.00) Lot 2 - Five Hundred Pesos (p500.00) Lot 3 - Five Hundred Pesos (p500.00) Lot 4 – One Thousand Pesos (p1,000.00) Lot 5 - Five Thousand Pesos (p5,000.00) Lot 6 - Five Hundred Pesos (p500.00) Lot 7 – One Thousand Pesos (p1,000.00) Lot 8 - Five Hundred Pesos (p500.00) The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees To Be Presented In Person. 6. The Department Of Education – Division Of Tangub City Will Hold A Pre-bid Conference On January 20, 2025, 9:00 Am At Division Office Conference Hall Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before 9:00 A.m. On February 4, 2025. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall February 4, 2025, 9:00 A.m. At The Given Address Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. Bidders Or Its Authorized Representatives Are Encouraged To Attend The Pre-bid Conference To Ensure That They Fully Understand The Procuring Entity’s Requirements. 11. The Department Of Education – Division Of Tangub City Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Gina L. Mandawe Head, Bac Secretariat Deped, Division Of Tangub City, Anecito Siete St., Mantic, Tangub City 7214 (088) 530-5988 Depedtangub.bacsec@deped.gov.ph Https://tangub.deped.gov.ph/ 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Https://tangub.deped.gov.ph/ Erlinda G. Dael, Phd., Cese Assistant Schools Division Superintendent Bac Chair
Closing Date4 Feb 2025
Tender AmountPHP 3.9 Million (USD 68 K)

FOOD AND DRUG ADMINISTRATION USA Tender

Chemical Products
United States
Details: This Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With The Format In Far Subpart 12.6, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued. The Government Reserves The Right To Award An Order Without Discussions If The Contracting Officer Determines That The Initial Offer Is Providing The Best Value And Discussions Are Not Necessary. solicitation Number 75f40125q00028 Is Issued As A Request For Quotation (rfq) Using Far Part 13 Procedures. the Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2025-02, Dated 01/03/2025. the Associated Naics Code Is 333914 And The Small Business Size Standard Is 1000 Employees. ******************************************************************** statement Of Work (sow): 1.0 Description Of Work 1.1 Background Information: the U.s. Food And Drug Administration’s Los Angeles District Office And Pacific Southwest Food And Feed Laboratory, Herein Referred To As Fda Irvine, Is An Fda Owned Facility Located In Irvine, Ca. Replacement Of End-of-life, Obsolete Vacuum Pump System. The Existing System Is Nearly 23 Years Old, Does Not Have Replacement Parts Available On The Market For Repair, And Represents A Single-point Failure Risk To The Facility's Vacuum System. Therefore, This Critical System Requires Replacement. 1.2 Purpose And Scope Of Work the Purpose Is To Provide A New Vacuum System Replacement And Installation At Fda Irvine. tasks: The Following Tasks Will Need To Be Provided But Are Not Limit To: Demo And Removal Of Existing Laboratory Vacuum System, Provide And Install Laboratory Vacuum System To Match Existing Technology. (current Model: Dekker Vmx0152ma2-00-ds, Minimum Salient Characteristics: Laboratory Vacuum System Model Aes-vmx0153ma2-45-ds. Piping Into And Out Are In Good Condition Without Any Visible Issues, Size Varies From 2” To 3”. Two Single Stage 10 Hp Liquid Ring Vacuum Pump Skids. Capacity Each Vacuum Pump (2 Pumps) 23.3 Scfm @ 25”hgvac. The Existing Voltage Going To The Vacuum Pump Is 460v, At A Minimum Upgrade The Disconnect Due To Its Age) coordinate And Schedule Delivery, Logistics, Preparation Of Site, And Installation Of Laboratory Vacuum System provide Energy, Water And Emissions (if Any) Cost Savings furnish And Install Bms Controls update Engineering And O&m Documentation startup And Testing 1.3 Period Of Performance: Tbd provide A Schedule With Timelines To Include Ordering Of All Parts, Shipping Timeframe, Preparation Of Site, And Install, And Inspection. the Work Shall Proceed Promptly Upon Execution Of The Resultant Contract And Only After The Issuance Of The Notice To Proceed (ntp) By The Government For The Activities Indicated. the Actual Performance Of The Work And Delivery Of The Required Documents Shall Be In Accordance With The Approved Project Schedule And Shall Be Completed Within 222 Calendar Days Of The Ntp Unless Otherwise Agreed Upon By The Project Officer (po) And Contracting Officer (co). 1.4 Place Of Performance u.s Food And Drug Administration Los Angeles District Office, Pacific Southwest Food And Feed Laboratory., Address: 19701 Fairchild Basement Level, Room B301, Irvine, Ca 92612. 2.0 Specific Requirements: the Contractor Shall Perform All Services Described In This Scope Of Services In Accordance With Applicable Requirements And Provisions Set Forth In This Statement Of Work. The Contractor Will Be Responsible For Relocating Any Electrical, Mechanical, Or Structural Building System Components Necessary To Perform This Work. If So, This Will Be Noted In This Scope Of Work And Such Work May Only Be Performed After Approval From Fda. The Contractor Shall Provide All Necessary Supervision, Labor, Material, Insurance, Training, And Equipment To: contractor Shall Provide Any Necessary Survey, Study, Or Technical Expert Services To Understand The Existing Conditions Of The Vacuum System At Fda Irvine. Contractor Shall Provide New Equipment With Matching Capacity, Or Better. The Necessary Constraints Shall Include, But Not Limited To, Vacuum Pump Hp And Tank Capacity. Contractor Shall Provide Equipment Cutsheet Submittals To Fda For Review And Approval Before Procurement Of Material. Contractor Shall Ensure N+1 Redundancy Integrated Into New System For Resilient Facility Operation. contractor Shall Assess And Provide Repairs Or Additions To Any Housekeeping Pad Intended To Support New Equipment, As Needed. Contractor Shall Provide New Control Panel, Field Located In An Accessible Area Near The Vacuum System. Control Panel Shall Be Integrated With Existing Building Automation System (bas) And Include Alarms Both To Bas And Readout Local To The Panel. Contractor Shall Utilize Power Feed To Existing Vacuum System. Contractor Shall Provide Independent Isolations Valves And Disconnect Means To Permit Service Of Each Vacuum Pump While Maintaining The System’s Operation. Contractor Shall Keep Equipment Shutdowns To A Minimum And Schedule/coordinate All Shutdowns With Fda While Providing Adequate Notice. Contractor Shall Provide Temporary Utilities For Any Shutdown Lasting Longer Than Three (3) Calendar Days. Weekend Shutdowns Are Preferred. Contractor Shall Provide All Inspection And Testing, Except Where Required By Code, Specification, Or Detailed Elsewhere In The Requirements Of This Document. familiarization Training On New System. 3.0 General Requirements: the Contractor Shall: adhere To Project Management Responsibilities As Defined Herein. appoint A Project Manager Who Shall Be The Government’s Primary Point Of Contact And Provide All Necessary Project Representation For The Successful Accomplishment Of The Said Work. the Project Manager Shall Be Thoroughly Familiar With All Requirements And Schedules. The Project Manager Shall Be Identified In The Firm’s Proposal Prior To Contract Award. coordinate All Project Related Activities Including Documentation Through The Project Officer (po) For Approval Unless Otherwise Denoted. bring Any Questions And/or Industry Specification Additions To The Attention Of The Po For Direction. perform All Work In A Skillful And Workmanlike Manner As Deemed Applicable To This Project. provide Appropriate Communication And Coordination Efforts With The Facility Department And The Po To Avoid Disruption Of Facility Operations While Performing Contract Work Such As Meetings, Proposed Phasing Plans, Outage Notifications, Etc. (where Applicable). obtain Necessary Badges Per Fda Policies And Guidelines (if Applicable). Fda Binding Process Is To Be Anticipated Of 1 Month. All Badging Must Be Completed Prior To Start Of On-site Construction. (for This Requirement The Contractor Shall Be Escorted) provide (to The Po) A List Of Possible Employees And Sub-contractors Who May Require Access To The Fda Premises Per The Project Being Administered. provide Utility Outage Notifications Per Facility Department Requirements (if Applicable). perform All Necessary Measurements And Sizing Associated With The Work Assigned. confirm Existing Conditions Of Work Assigned. perform All Associated Project Work In Accordance With Fda; Executive Orders, Energy Policy Act (epact), Energy Independence And Security Act (eisa), Sustainable Design And Federal Regulations; Local City, County, And State Building Codes And Regulations; National Electrical Code (nec), American Society Of Mechanical Engineers (asme), National Fire Protection Association (nfpa), Occupational Safety And Health Administration (osha), Underwriters Laboratories (ul), American National Standards Institute (ansi), And Institute Of Electrical And Electronics Engineers (ieee) Rules And Regulations And Standards; And All Other Applicable Industry Standards. restore All Affected Areas Back To Pre-project Conditions Or Better By The Completion Of The Specified Project Including Necessary Patching, Repairing And/or Replacing. provide All Necessary Drawings, Documentation, And Literature For All Recommended Items Where Applicable. provide All Labor And Equipment Necessary To Accomplish The Above Specified Tasks. assume All Risk And Shall Be Liable For Any Damages To Persons Or Property Caused By The Contractor. be Solely Responsible For The Quality Of His/her Work. Deficiencies And Omissions Shall Be Corrected Prior To Government Acceptance Of Work. be Responsible For Removing Construction And Demolition Debris Daily From Site. The Contractor Shall Provide The Dumpster For The Debris. 5.0 Government Furnished Material And Resources: 5.1 The Government Shall Provide, But Are Not Limited To, The Following Items: site Utility Drawings (upon Request-pdf) point(s) Of Contact At The Fda Site (kickoff Meeting) photographs Of Work-site Conditions And Others As Needed irvine Lab Specification Report Volume 2 (section 15486) (upon Request-pdf) 6.0 Submittals: 6.1 General: Under The Resultant Contract, Unless Otherwise Denoted, The Contractor Shall Provide All Services Necessary To Perform The Following Activities As Related To Completing The Fda Irvine Vacuum Replacement Mentioned Above: project Kick-off Meeting project Schedule (with Earned Value And Loaded Dollar Values) plan Of Action (plan Shall Include Names Of Team Members And Pm – And Phone/email) point-of-contact, Project Manager, Safety And Hazardous Material Plan progress Meetings, Meeting Minutes For Review And Approval By Po (within Five Business Days), 6.2 Deliverables: The Contractor Shall Provide All Deliverables In Accordance With The Project Schedule And Fda Policy Guidelines, And Compliant With Section 508 Requirements. 6.2.1 Physical Deliverables (format): The Documentation Process Shall Be Compiled And Provided Per The Following Submission Requirements Unless Otherwise Denoted: two (2) Copies Of The Operations And Maintenance (o&m) Manuals Shall Be Provided Physically In Binders And Electronically Per Compact Disc And Digital Versatile Disc (cd/dvds) (if Applicable). non-stick, Locking Slant D-style, Three Ring View Binders, 8 1/2x 11 Inches. title, Fda Logo, Contract And Project Number, Submission % (if Applicable), Etc. Shall Be Located On The Front Cover And Spine Of Binder(s). cd/dvds Shall Contain Electronic Copies Of Any Reports, Calculations, Modeling(s), Drawings, Videos, Photos And O&m Manuals Per Final Submission. Cd/dvds Shall Have Printed Labels. cd/dvds Shall Be Placed In Cd/dvd Page Holders With Slaps (like Avery 75263 Or Avery 73721) When Associated With A Binder. Avery 75263 For Multiple Discs And Avery 73721 For A Single Disc. three (3) Signed Copies Of All Warranties Shall Be Provided In Binders And Electronically Per Cd/dvds. Warranty Start Date Shall Begin No Earlier Than The Date Of Installation Acceptance. one (1) Equipment Submission. four (4) Physical Copies Of As-built Marked-up Drawings, Documentation, Etc. For Review And Discussion. Also, Provide Electronic Copies Of The Drawings, Etc. All Electronic Drawings Shall Be Provided In Portable Document Format (pdf) And Computer-aided Design (cad). Deliverables Are To Be Submitted To The Cor And/or Po, Unless Otherwise Stated. four (4) Copies Of Final Drawings Shall Be Provided In Pdf And Cad. *************************************************************************** government Holidays a. The Government Hereby Provides Notification That Government Personnel Observe The Listed Days As Holidays: (1) New Year's Day (7) Labor Day (2) Martin Luther King's Birthday (8) Columbus Day (3) President’s Day (9) Veterans' Day (4) Memorial Day (5) Juneteenth Day (10) Thanksgiving Day (6) Independence Day (11) Christmas Day b. In Addition To The Days Designated As Holidays, The Government Observes The Following Days: (1) Any Other Day Designated By Federal Statute (2) Any Other Day Designated By Executive Order (3) Any Other Day Designated By The President’s Proclamation c. When Any Such Day Falls On A Saturday, The Following Monday Is Observed. Except For Designated Around-the-clock Or Emergency Operations, Contractor Personnel Will Not Be Able To Perform On-site Under This Contract With Fda On Holidays Set Forth Above. The Contractor Will Not Charge Any Holiday As Direct Charge To The Award. d. It Is Understood And Agreed Between The Government And The Contractor That Observance Of Such Days By Government Personnel Shall Not Otherwise Be A Reason For An Additional Period Of Performance, Or Entitlement Of Compensation Except As Set Forth Within The Award. e. Nothing In This Abrogates The Rights And Responsibilities Of The Parties Relating To Stop Work. applicable Provisions And Clauses: far 52.252‐2 Solicitation Provisions Incorporated By Reference (feb 1998) this Contract Incorporates One Or More Clauses By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. Also, The Full Text Of A Clause May Be Accessed Electronically At This/these Address(es): Https://www.acquisition.gov/far And .https://www.acquisition.gov/hhsar far Provisions: far 52.212-1, Instructions To Offerors—commercial Products And Commercial Services (sept 2023) far 52.212-2, Evaluation—commercial Products And Commercial Services (fill In Evaluation Criteria) (nov 2021) far 52.212-3, Offeror Representations And Certifications—commercial Products And Commercial Services(may 2024) hhsar Provisions: hhsar 352.239-73, Electronic And Information Technology Accessibility Notice.(dec 2015) far Clauses: by Reference far 52.212-4, Contract Terms And Conditions—commercial Products And Commercial Services (nov 2023) by Full Text far 52.212-5contract Terms And Conditions Required To Implement Statutes Or Executive Orders—commercial Products And Commercial Services.(jan 2025) (a)the Contractorshallcomply With The Following Federalacquisitionregulation (far) Clauses, Which Are Incorporated In This Contract By Reference, To Implement Provisions Of Law Or Executive Orders Applicable Toacquisitionsofcommercial Productsandcommercial Services: (1)52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements(jan 2017)(section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (2)52.204-23, Prohibition Oncontractingfor Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities(dec 2023)(section 1634 Of Pub. L. 115-91). (3)52.204-25, Prohibition Oncontractingfor Certain Telecommunications And Video Surveillance Services Or Equipment.(nov 2021)(section 889(a)(1)(a) Of Pub. L. 115-232). (4)52.209-10, Prohibition Oncontractingwith Inverted Domestic Corporations(nov 2015). (5)52.232-40, Providing Accelerated Payments Tosmall Business Subcontractors(mar 2023)(31 U.s.c. 3903and10 U.s.c. 3801). (6)52.233-3, Protest After Award(aug 1996)(31u.s.c.3553). (7)52.233-4, Applicable Law For Breach Of Contractclaim(oct 2004)(public Laws 108-77 And 108-78 ( 19u.s.c.3805note)). (b)the Contractorshallcomply With The Far Clauses In This Paragraph (b) That Thecontracting Officerhas Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable Toacquisitionsofcommercial Productsandcommercial Services: _x_(1)52.203-6, Restrictions On Subcontractor Sales To The Government(jun 2020),withalternatei(nov 2021)(41u.s.c.4704 And10 U.s.c. 4655). _x_(2)52.203-13, Contractor Code Of Business Ethics And Conduct(nov 2021)(41u.s.c.3509)). __(3)52.203-15, Whistleblower Protections Under The American Recovery And Reinvestment Act Of 2009(jun 2010)(section 1553 Of Pub. L. 111-5). (applies To Contracts Funded By The American Recovery And Reinvestment Act Of 2009.) _x_(4)52.203-17, Contractor Employee Whistleblower Rights(nov 2023)(41 U.s.c. 4712); This Clause Does Not Apply To Contracts Of Dod, Nasa, The Coast Guard, Or Applicable Elements Of The Intelligence Community—see Far3.900(a). _x_(5)52.204-10, Reporting Executive Compensation And First-tier Subcontract Awards(jun 2020)(pub. L. 109-282) (31u.s.c.6101note). __(6)[reserved]. _x_(7)52.204-14, Service Contract Reporting Requirements(oct 2016)(pub. L. 111-117, Section 743 Of Div. C). __(8)52.204-15, Service Contract Reporting Requirements For Indefinite-delivery Contracts(oct 2016)(pub. L. 111-117, Section 743 Of Div. C). _x_(9)52.204-27, Prohibition On A Bytedance Covered Application(jun 2023)(section 102 Of Division R Of Pub. L. 117-328). __(10)52.204-28, Federalacquisitionsupply Chain Security Act Orders—federal Supply Schedules, Governmentwideacquisitioncontracts, And Multi-agency Contracts.(dec 2023)(pub. L. 115–390, Title Ii). __(11)(i)52.204-30, Federalacquisitionsupply Chain Security Act Orders—prohibition.(dec 2023)(pub. L. 115–390, Title Ii). __(ii)alternatei(dec 2023)of52.204-30. _x_(12)52.209-6, Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed Fordebarment.(nov 2021)(31u.s.c.6101note). __(13)52.209-9, Updates Of Publicly Available Information Regarding Responsibility Matters(oct 2018)(41u.s.c.2313). __(14)[reserved]. __(15)52.219-3, Notice Ofhubzoneset-aside Or Sole-source Award (oct 2022) (15u.s.c.657a). __(16)52.219-4, Notice Of Price Evaluation Preference Forhubzonesmall Business Concerns (oct 2022) (if Theofferorelects To Waive The Preference, Itshallso Indicate In Itsoffer) (15u.s.c.657a). __(17)[reserved] _x_(18)(i)52.219-6, Notice Of Total Small Business Set-aside(nov 2020)(15u.s.c.644). __(ii)alternatei(mar 2020)of52.219-6. __(19)(i)52.219-7, Notice Of Partial Small Business Set-aside(nov 2020)(15u.s.c.644). __(ii)alternatei(mar 2020)of52.219-7. _x_(20)52.219-8, Utilization Of Small Business Concerns (feb 2024) (15u.s.c.637(d)(2) And (3)). __(21)(i)52.219-9, Small Business Subcontracting Plan (sep 2023) (15u.s.c.637(d)(4)). __(ii)alternatei(nov 2016)of52.219-9. __(iii)alternateii(nov 2016)of52.219-9. __(iv)alternateiii(jun 2020)of52.219-9. __(v)alternateiv (sep 2023) Of52.219-9. __(22)(i)52.219-13, Notice Of Set-aside Of Orders(mar 2020)(15u.s.c.644(r)). __(ii)alternatei(mar 2020)of52.219-13. _x_(23)52.219-14, Limitations On Subcontracting (oct 2022) (15u.s.c.657s). __(24)52.219-16, Liquidated Damages—subcontracting Plan(sep 2021)(15u.s.c.637(d)(4)(f)(i)). __(25)52.219-27, Notice Of Set-aside For, Or Sole-source Award To, Service-disabled Veteran-owned Small Business (sdvosb) Concerns Eligible Under The Sdvosb Program (feb 2024) (15u.s.c.657f). _x_(26)(i)52.219-28, Post Award Small Business Program Rerepresentation (feb 2024) (15u.s.c.632(a)(2)). __(ii)alternatei(mar 2020)of52.219-28. __(27)52.219-29, Notice Of Set-aside For, Or Sole-source Award To, Economically Disadvantagedwomen-owned Small Business Concerns(oct 2022) (15u.s.c.637(m)). __(28)52.219-30, Notice Of Set-aside For, Or Sole-source Award To, Women-owned Small Business Concerns Eligible Under The Women-owned Small Business Program (oct 2022) (15u.s.c.637(m)). __(29)52.219-32, Orders Issued Directly Under Small Business Reserves(mar 20x20)(15u.s.c.644(r)). _x_(30)52.219-33, Nonmanufacturer Rule(sep 2021)(15 U.s.c. 637(a)(17)). _x_(31)52.222-3, Convict Labor(jun 2003)(e.o.11755). __(32)52.222-19, Child Labor-cooperation With Authorities And Remedies(feb 2024). _x_(33)52.222-21, Prohibition Of Segregated Facilities(apr 2015). _x_(34)(i)52.222-26, Equal Opportunity(sep 2016)(e.o.11246). __(ii)alternatei(feb 1999)of52.222-26. _x_(35)(i)52.222-35, Equal Opportunity For Veterans(jun 2020)(38u.s.c.4212). __(ii)alternatei(jul 2014)of52.222-35. _x_(36)(i)52.222-36, Equal Opportunity For Workers With Disabilities(jun 2020)(29u.s.c.793). __(ii)alternatei(jul 2014)of52.222-36. _x_(37)52.222-37, Employment Reports On Veterans (jun 2020) (38u.s.c.4212). _x_(38)52.222-40, Notification Of Employee Rights Under The National Labor Relations Act(dec 2010)(e.o. 13496). _x_(39)(i)52.222-50, Combating Trafficking In Persons(nov 2021)(22u.s.c.chapter78 And E.o. 13627). __(ii)alternatei(mar 2015)of52.222-50(22u.s.c.chapter78 And E.o. 13627). __(40)52.222-54, Employment Eligibility Verification(may2022)(executive Order 12989). (not Applicable To Theacquisitionof Commercially Available Off-the-shelf Items Or Certain Other Types Ofcommercial Productsorcommercial Servicesas Prescribed In Far22.1803.) __(41)(i)52.223-9, Estimate Of Percentage Ofrecovered Materialcontent For Epa–designated Items (may2008) ( 42u.s.c.6962(c)(3)(a)(ii)). (not Applicable To Theacquisitionof Commercially Available Off-the-shelf Items.) __(ii)alternatei(may2008)of52.223-9(42u.s.c.6962(i)(2)(c)). (not Applicable To Theacquisitionof Commercially Available Off-the-shelf Items.) __(42)52.223-11, Ozone-depleting Substances And High Global Warming Potential Hydrofluorocarbons(may2024)(42 U.s.c. 7671,et Seq.). __(43)52.223-12, Maintenance, Service, Repair, Or Disposal Of Refrigeration Equipment And Air Conditioners(may2024)(42 U.s.c. 7671,et Seq.). _x_(44)52.223-20, Aerosols(may2024)(42 U.s.c. 7671,et Seq.). _x_(45)52.223-21, Foams(may2024)(42 U.s.c. 7671,et Seq.). _x_(46)52.223-23,sustainable Products And Services(may2024)(e.o. 14057,7 U.s.c. 8102,42 U.s.c. 6962,42 U.s.c. 8259b, And42 U.s.c. 7671l). __(47)(i)52.224-3privacy Training(jan 2017)(5 U.s.c. 552a). __(ii)alternatei(jan 2017)of52.224-3. _x_(48)(i)52.225-1, Buy American-supplies(oct 2022)(41u.s.c.chapter83). __(ii)alternatei(oct 2022)of52.225-1. __(49)(i)52.225-3, Buy American-free Trade Agreements-israeli Trade Act(nov 2023)(19 U.s.c. 3301 Note,19 U.s.c. 2112 Note,19 U.s.c. 3805 Note,19 U.s.c. 4001 Note,19 U.s.c. Chapter 29(sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, And 112-43. __(ii)alternatei [reserved]. __(iii)alternateii(jan 2025)of52.225-3. __(iv)alternateiii(feb 2024)of52.225-3. __(v)alternateiv (oct 2022) Of52.225-3. __(50)52.225-5, Trade Agreements(nov 2023)(19u.s.c.2501,et Seq.,19u.s.c.3301note). x__(51)52.225-13, Restrictions On Certain Foreign Purchases(feb 2021)(e.o.’s, Proclamations, And Statutes Administered By The Office Of Foreign Assets Control Of The Department Of The Treasury). __(52)52.225-26, Contractors Performing Private Security Functions Outside Theunited States(oct 2016) (section 862, As Amended, Of Thenational Defenseauthorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). __(53)52.226-4, Notice Of Disaster Oremergencyarea Set-aside (nov 2007) (42u.s.c.5150). __(54)52.226-5, Restrictions On Subcontracting Outside Disaster Oremergencyarea(nov 2007)(42u.s.c.5150). _x_(55)52.226-8, Encouraging Contractor Policies To Ban Text Messaging While Driving(may2024)(e.o. 13513). __(56)52.229-12, Tax On Certain Foreignprocurements(feb 2021). __(57)52.232-29, Terms For Financing Of Purchases Ofcommercial Productsandcommercial Services(nov 2021)(41u.s.c.4505,10 U.s.c. 3805). __(58)52.232-30, Installment Payments Forcommercial Productsandcommercial Services(nov 2021)(41u.s.c.4505,10 U.s.c. 3805). _x_(59)52.232-33, Payment Byelectronic Funds Transfer-system For Award Management(oct2018)(31u.s.c.3332). __(60)52.232-34, Payment Byelectronic Funds Transfer-other Thansystem For Award Management(jul 2013) (31u.s.c.3332). __(61)52.232-36, Payment By Third Party(may2014)(31u.s.c.3332). __(62)52.239-1, Privacy Or Security Safeguards(aug 1996)(5u.s.c.552a). __(63)52.240-1, Prohibition On Unmanned Aircraft Systems Manufactured Or Assembled By American Security Drone Act-covered Foreign Entities(nov 2024)(sections 1821-1826, Pub. L. 118-31,41 U.s.c. 3901note Prec.). __(64)52.242-5, Payments Tosmall Business Subcontractors(jan 2017)(15u.s.c.637(d)(13)). __(65)(i)52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels(nov 2021)(46 U.s.c. 55305and 10u.s.c.2631). __(ii)alternatei(apr 2003)of52.247-64. __(iii)alternateii(nov 2021)of52.247-64. (c)the Contractorshallcomply With The Far Clauses In This Paragraph (c), Applicable Tocommercial Services, That Thecontracting Officerhas Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable Toacquisitionsofcommercial Productsandcommercial Services: _x_(1)52.222-41, Service Contract Labor Standards(aug 2018)(41u.s.c.chapter67). __(2)52.222-42, Statement Of Equivalent Rates For Federal Hires(may2014)(29u.s.c.206 And 41u.s.c.chapter67). __(3)52.222-43, Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (multiple Year Andoptioncontracts)(aug 2018)(29u.s.c.206 And 41u.s.c.chapter67). __(4)52.222-44, Fair Labor Standards Act And Service Contract Labor Standards-price Adjustment (may2014) (29u.s.c.206and 41u.s.c.chapter67). __(5)52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may2014) (41u.s.c.chapter67). __(6)52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements(may2014)(41u.s.c.chapter67). __(7)52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026(jan 2022). __(8)52.222-62, Paid Sick Leave Under Executive Order 13706(jan 2022)(e.o. 13706). __(9)52.226-6, Promoting Excess Food Donation To Nonprofit Organizations (jun 2020) (42u.s.c.1792). __(10)52.247-69, Reporting Requirement For U.s.-flag Air Carriers Regarding Training To Prevent Human Trafficking(jan 2025)(49 U.s.c. 40118(g)). (d)comptroller General Examination Of Record. The Contractorshallcomply With The Provisions Of This Paragraph (d) If This Contract Was Awarded Using Other Than Sealed Bid, Is In Excess Of Thesimplified Acquisition Threshold, As Defined In Far2.101, On The Date Of Award Of This Contract, And Does Not Contain The Clause At52.215-2, Audit And Records-negotiation. (1)the Comptroller General Of Theunited States, Or An Authorized Representative Of The Comptroller General,shallhave Access To And Right To Examine Any Of The Contractor’s Directly Pertinent Records Involving Transactions Related To This Contract. (2)the Contractorshallmake Available At Its Offices At All Reasonable Times The Records, Materials, And Other Evidence For Examination, Audit, Or Reproduction, Until 3 Years After Final Payment Under This Contract Or For Any Shorter Period Specified In Far Subpart4.7, Contractor Records Retention, Of The Other Clauses Of This Contract. If This Contract Is Completely Or Partially Terminated, The Records Relating To The Work Terminatedshallbe Made Available For 3 Years After Any Resulting Final Termination Settlement. Records Relating To Appeals Under The Disputes Clause Or To Litigation Or The Settlement Ofclaimsarising Under Or Relating To This Contractshallbe Made Available Until Such Appeals, Litigation, Orclaimsare Finally Resolved. (3)as Used In This Clause, Records Include Books, Documents, Accounting Procedures And Practices, And Other Data, Regardless Of Type And Regardless Of Form. This Does Not Require The Contractor To Create Or Maintain Any Record That The Contractor Does Not Maintain In The Ordinary Course Of Business Or Pursuant To A Provision Of Law. (e)(1)notwithstanding The Requirements Of The Clauses In Paragraphs (a), (b), (c), And (d) Of This Clause, The Contractor Is Not Required To Flow Down Any Far Clause, Other Than Those In This Paragraph (e)(1), In A Subcontract Forcommercial Productsor Commercial Services. Unless Otherwise Indicated Below, The Extent Of The Flow Downshallbe As Required By The Clause- (i)52.203-13, Contractor Code Of Business Ethics And Conduct(nov 2021)(41u.s.c.3509). (ii)52.203-17, Contractor Employee Whistleblower Rights(nov 2023)(41 U.s.c. 4712). (iii)52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (iv)52.204-23, Prohibition Oncontractingfor Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities(dec 2023)(section 1634 Of Pub. L. 115-91). (v)52.204-25, Prohibition Oncontractingfor Certain Telecommunications And Video Surveillance Services Or Equipment.(nov 2021)(section 889(a)(1)(a) Of Pub. L. 115-232). (vi)52.204-27, Prohibition On A Bytedance Covered Application(jun 2023)(section 102 Of Division R Of Pub. L. 117-328). (vii)(a)52.204–30, Federalacquisitionsupply Chain Security Act Orders—prohibition.(dec 2023)(pub. L. 115–390, Title Ii). (b)alternatei(dec 2023)of 52.204–30. (viii)52.219-8, Utilization Of Small Business Concerns (feb 2024) (15u.s.c.637(d)(2)and (3)), In All Subcontracts Thatofferfurther Subcontracting Opportunities. If The Subcontract (except Subcontracts To Small Business Concerns) Exceeds The Applicable Threshold Specified In Far19.702(a) On The Date Of Subcontract Award, The Subcontractormustinclude52.219-8in Lower Tier Subcontracts Thatoffersubcontracting Opportunities. (ix)52.222-21, Prohibition Of Segregated Facilities(apr 2015). (x)52.222-26, Equal Opportunity(sep 2016)(e.o.11246). (xi)52.222-35, Equal Opportunity For Veterans(jun 2020)(38u.s.c.4212). (xii)52.222-36, Equal Opportunity For Workers With Disabilities(jun 2020)(29u.s.c.793). (xiii)52.222-37, Employment Reports On Veterans(jun 2020)(38u.s.c.4212). (xiv)52.222-40, Notification Of Employee Rights Under The National Labor Relations Act(dec 2010)(e.o. 13496). Flow Down Required In Accordance With Paragraph (f) Of Far Clause52.222-40. (xv)52.222-41, Service Contract Labor Standards(aug 2018)(41u.s.c.chapter67). (xvi)(a)52.222-50, Combating Trafficking In Persons(nov 2021)(22u.s.c.chapter78 And E.o 13627). (b)alternatei(mar 2015)of52.222-50(22u.s.c.chapter78ande.o.13627). (xvii)52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment-requirements (may2014) (41u.s.c.chapter67). (xviii)52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements(may2014)(41u.s.c.chapter67). (xix)52.222-54, Employment Eligibility Verification(may2022)(e.o. 12989). (xx)52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026(jan 2022). (xxi)52.222-62, Paid Sick Leave Under Executive Order 13706(jan 2022)(e.o. 13706). (xxii)(a)52.224-3, Privacy Training (jan 2017) (5u.s.c.552a). (b)alternatei(jan 2017)of52.224-3. (xxiii)52.225-26, Contractors Performing Private Security Functions Outside Theunited States(oct 2016)(section 862, As Amended, Of Thenational Defenseauthorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). (xxiv)52.226-6, Promoting Excess Food Donation To Nonprofit Organizations(jun 2020)(42u.s.c.1792). Flow Down Required In Accordance With Paragraph (e) Of Far Clause52.226-6. (xxv)52.232-40, Providing Accelerated Payments Tosmall Business Subcontractors(mar 2023) (31 U.s.c. 3903and10 U.s.c. 3801). Flow Down Required In Accordance With Paragraph (c) Of52.232-40. (xxvi)52.240-1, Prohibition On Unmanned Aircraft Systems Manufactured Or Assembled By American Security Drone Act-covered Foreign Entities(nov 2024)(sections 1821-1826, Pub. L. 118-31,41 U.s.c. 3901note Prec.). (xxvii)52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels(nov 2021)(46 U.s.c. 55305and 10u.s.c.2631). Flow Down Required In Accordance With Paragraph (d) Of Far Clause52.247-64. (2)while Not Required, The Contractormayinclude In Its Subcontracts Forcommercial Productsandcommercial Servicesa Minimal Number Of Additional Clauses Necessary To Satisfy Its Contractual Obligations. (end Of Clause) hhsar Clauses: hhsar 352.203-70, Anti-lobbying (dec 2015) hhsar 352.222-70, Contractor Cooperation In Equal Employment Opportunity Investigations (dec 2015) hhsar 352.239-74, Electronic And Information Technology Accessibility additional Clauses: far 52.204-7, System For Award Management far 52.204-13, System For Award Management Maintenance far 52.204-24, Representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment instructions To Offerors: addendum To Far 52.212-1 Instructions To Offeror-commercial Items: proposal Submission Format: ***quotes Shall Be In 2 Volumes: 1 Technical And 2 Price. The Volumes Shall Be Separate And Complete. The Volumes Shall Be Separate And Complete, So That Evaluation Of One May Be Accomplished Independently Of, And Concurrently With, The Evaluation Of The Other. No Pricing Information Shall Be Provided In Volume 1.*** the Total Number Of Pages For The Technical Quote Shall Not Exceed Ten (10) Pages, Using 1” Margins, Single Spaced, Font Type Time New Roman, And A Font Size Of 12. ***the Solicitation Does Not Commit The Government To Pay Any Cost For The Preparation And Submission Of A Quote Or Proposal. It Is Also Advised That The Contracting Officer (co) Is The Only Individual Who Can Legally Commit And Obligate The Government To The Expenditure Of Public Funds In Connection With The Proposed Acquisition.*** the Contractor Shall Indicate At A Minimum Salient Characteristics Have Been Met To Be Considered Responsive For This Requirement. The Contractor Shall Demonstrate How The Requested Items Or Services, “meet” Or “do No Meet” The Salient/functional Characteristics And Specifications Listed Here-below. The Contractor Shall Annotate Each Salient/functional Characteristics And Specifications With The Following: Meets (if It Meets The Specification) Or Does Not Meet (if It Fails To Meet The Specification). 1.grey Market Or Refurbished Products Will Not Be Accepted. 2. The Vendor Shall Indicate If Non-domestic Items Are Included In The Quote. 3. The Vendor Shall Provide All, Of The Items/services Listed Or None. 4. The Vendor Shall Meet All Technical/salient/functional, Operational Characteristics And Specifications Listed, And If Not The Manufacturer, Shall Be Able To Provide The Required Service With Oem Certified Technicians And Parts Or Show Proof That They Are An Authorized Third Party Reseller/provider. 5. Be Advised That Fda Does Not Accept Documents Which Contain The Use Of Macros. When Submitting Documents Via Email, Do Not Include .exe, Mso, Or Any Other Executable File Types That Could Potentially Trigger Email Security Protections (i.e. Email Blocks, Quarantine). Document Submissions Required Throughout The Award Period(s) Shall Not Have Macro Enabled Functionality And Any Document Delivered Having That Functionality Will Be Deemed Delinquent, If Not Corrected Prior To The Due Date. addendum Paragraph (b): the Quoter Shall Submit A Written Accessibility Conformance Report (acr) For Each Item Not In Compliance With 508 Standards Identified In Clause 352.239-74, Describing How The Item(s) Will Fully Address The Accessibility Requirements Outlined In The Solicitation; And A Description Of The Evaluation Methods The Offeror Will Use To Validate For Conformance To The Revised 508 Standards. The Acr Should Be Based On The Voluntary Product Accessibility Template Version 2.0 (ms Word) Provided By The Industry Technology Industry Council (itic). the Offeror Or Applicant Shall Submit All Electronic Documents For Microsoft Office Suite Products Without The Use Of “macros”. When Submitting Proposals Via Email, Do Not Include .exe, .mso, Or Any Other Executable File Types That Could Potentially Trigger Email Security Protections (i.e. Email Blocks, Quarantine). If The Offeror Or Applicant Submits Documents That Contain Macros, Macro Referenced Files, And/or Executable Files, The Government Will Not Be Able To View Or Open Such Documents And The Submission Will Be Considered Non-responsive To The Solicitation. No Additional Time Will Be Given To An Offeror Or Applicant To Correct The Document Submission And The Government Will Not Inform The Offeror Or Applicant That Their Submission Is Non-responsive Prior To Award. It Is The Offeror’s Or Applicant’s Responsibility To Ensure All Electronic Documents Are Submitted Without The Use Of Macros. technical Acceptability: Will Be Determined By Review Of Information Submitted By The Offeror Which Must Provide Sufficient Technical Information Necessary For The Government To Determine That The Offered Items, Components, And Services Meet Or Exceed The Technical Requirements Identified Above. Offerors Shall Specifically Address The Performance Specifications And Support Same With Submitted Technical Specifications, Descriptive Material, Literature, Brochures, Scientific Publications Where Proposed Solution Has Been Used For Same Or Similar Purposes, And Other Information Which Demonstrates The Capability Of The Offered Solution At Meeting Or Exceeding The Stated Needs Of The Fda. the Contractor Shall Provide Place Of Product Manufacture Or Service Performance And Any Other Applicable Information To Enable Review And Analysis Pertaining To The Buy American Statute And Requirements Relating To Made In America In The Event Of Nonavailability Waiver Request Through The Miao Digital Waiver Portal Is Needed. price: Provide Detailed Price Quote For Each Item/component Proposed To Meet The Schedule Of Items. Include The Firm’s Unique Entity Id (sam) Number With Quote. the Government Is Not Responsible For Locating Or Securing Any Information Which Is Not Identified In The Proposal However The Government Reserves The Right To Obtain Information For Use In The Evaluation From Any And All Sources Including Sources Outside Of The Government. quotes Must Include: Pricing For Each Line Item, Delivery Schedule, Technical Specifications Of The Offered Product. ************************************************************************************* mandatory Site Visit: Offerors Are Required To Attend At No Cost To The Government. a Mandatory Site Visit Is To Inspect The Current Site Where The Vacuum Pump And Preexisting Conditions Are Located. The Site Visit Is Located At: u.s Food And Drug Administration Los Angeles District Office pacific Southwest Food And Feed Laboratory 19701 Fairchild Road irvine, Ca 92612 date: January 29, 2025, start Time: 9:15 Am Pacific Time offeror Must Electronically Provide No Later Than Friday, January 23, 2025, At 10:00am Eastern Time (et), The Company Name And Attendees Names To The Contracting Officer. Each Attendee Must Possess And Present A Valid Government Issued Identification To Enter The Site. Allow 2 Hours For The Site Visit. Failure To Attend The Site Visit Will Result In The Offeror Considered Nonresponsive To The Combined Synopsis Solicitation. during The Site Visit, Offerors Shall Have An Opportunity To Inspect The Site And Ask Questions. All Questions And Answers Will Be Documented And Provided To All Offerors As An Amendment To The Combined Synopsis Solicitation. The Government Will Maintain A Record Of All Attendees, Including Names, And Affiliations. please See The Attached Combined Synopsis Solicitation Document In Full Text.
Closing Date12 Feb 2025
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Housekeeping Services
United States
Details: Please Refer To Attached Amendment - Vendor Q&a36c24425q0230 0001 section A: Description This Is A Combined Synopsis/solicitation For Commercial Services Prepared In Accordance With The Format In Federal Acquisition Regulation (far) Subpart 12.6, Streamlined Procedures For Evaluation And Solicitation For Commercial Products And Commercial Services, In Conjunction With Far Part 13 As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested, And A Written Solicitation Document Will Not Be Issued. This Solicitation Is Issued As An Rfq, Number 36c24425q0230. The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2025-02 Effective 01/03/2025. The Complete Text Of Any Of The Clauses And Provisions May Be Accessed In Full Text At Far | Acquisition.gov. This Solicitation Is Being Competed On A Full And Open Competitive Basis. The Government Reserves The Right To Make Split Awards As A Result Of This Solicitation. The Associated North American Industrial Classification System (naics) Code For This Procurement Is 812332 Industrial Launders, With A Small Business Size Standard Of $47 Million. The Fsc/psc Is S209 - Housekeeping Laundry/drycleaning. Complete Instructions For Submitting A Response To This Solicitation And Applicable Provisions And Clauses Are Found In 36c24425q0230. All Offerors Are Advised To Pay Careful Attention To The Quote Submission Instructions As There Are Very Specific Instructions As What Is Required To Be Provided. The Contract Period Of Performance (pop) Is Anticipated To Be 03/24/2025 Through 03/23/2030. Should Issuance Of The Award Occur On A Different Date, The Performance Period Will Be Adjusted Accordingly. Any Award Resulting From This Solicitation Will Be Issued On A Standard Form 1449. Note: To Receive An Award Resulting From This Solicitation, Offerors Must Be Registered In The System For Award Management (sam) Database. Registration May Be Done Online At: Www.acquisition.gov Or Www.sam.gov. Section B: Statement Of Work The Pittsburgh, Pa Contracting Office Is Seeking Uniform Rental, Alteration And Laundering Services To Support The Wilkes Barre Va Medical Center, Located At 1111 East End Blvd., Wilkes Barre, Pa 18711. See Attached Statement Of Work (sow) For Complete Details. Section C: Price Schedule All Interested Companies Shall Provide Quotations For The Following: Supplies/services Quantities Listed Are Estimates. While Week Is The Unit Of Measure In This Combined Synopsis, Vendors May Price The Work In Other Industry-wide Acceptable Units, Such As Lbs. Line Item Description Quantity Unit Of Measure Unit Price Total Price 0001 Uniform Supply And Laundry Service In Accordance With Statement Of Work Year 1 52 Wk 1001 Uniform Supply And Laundry Service In Accordance With Statement Of Work Year 2 52 Wk 2001 Uniform Supply And Laundry Service In Accordance With Statement Of Work Year 3 52 Wk 3001 Uniform Supply And Laundry Service In Accordance With Statement Of Work Year 4 52 Wk 4001 Uniform Supply And Laundry Service In Accordance With Statement Of Work Year 5 52 Wk Place Of Performance: Wilkes Barre Va Medical Center 1111 East End Blvd. Wilkes Barre, Pa 18711 Section D: Evaluation Of Quotations The Government Will Select The Quote That Represents The Best Benefit To The Government At A Price That Can Be Determined Reasonable. Specific Information To Be Included In Quotes Is Detailed Below In Instructions To Offerors Commercial Items . Following Receipt Of Quotes, The Government Will Perform A Comparative Evaluation Of The Services Quoted In Accordance With Far 13.106-2(b)(3). The Government Will Compare Quotes To One Another To Select The Quote That Best Benefits The Government By Fulfilling The Requirement. Additional Information Pertaining To Comparative Evaluation Is Below: What Comparative Evaluation Is: It Is The Direct Comparison Of One Quotation/offer With Another In A Uniform And Fair Manner To Determine Which Quote/offer Provides The Government What It Needs, Where And When, As Identified In The Rfq It Is An Assessment Of Which Response Is The Best As A Whole Once One Quotation/offer Is Found Acceptable, It Is Compared Side By Side To The Remaining Ones, And The Best One Is Chosen What Comparative Evaluation Is Not: It Does Not Individually Evaluate Quote/offers Against Specified Evaluation Factors It Does Not Assign A Rating Using A Color, Numerical, Or Other Rating Methodology Although The Process Is Not Prohibited, It Does Not Require Additional Evaluation To Determine If Minimal Advantage Is Worth A Minimal Or Normal Price Difference It Is Not A Low Price Technically Acceptable (lpta) Or Trade-off Process Contractors May Submit More Than One Quote; However, Contractors Are Strongly Encouraged To Submit Their Best Technical Solutions And Prices In Response To This Request For Quote. All Quotes Must Be Submitted By The Deadline To Be Considered For Evaluation. The Government Reserves The Right To Not Select Any Quotes For Award. Additionally, The Government Reserves The Right To Cancel This Solicitation At Any Time Without Making Award. The Contractor Is Responsible For All Quote Preparation Costs, Which, Under No Circumstances, Will Be Paid Or Otherwise Provided For By The Government. Once The Government Determines There Is/are A Contractor(s) That Can Provide A Service That Meet(s) The Requirements Of This Request For Quote, The Government Reserves The Right To Communicate With Only Those Contractors Quoting The Best-suited Service To Address Any Remaining Issues. The Contracting Officer Will Evaluate Technical Capability, Price, And Past Performance. Section E: Clauses And Provisions The Full Text Of Far Provisions Or Clauses May Be Accessed Electronically At Http://acquisition.gov/comp/far/index.html. The Following Solicitation Provisions Apply To This Acquisition: Far 52.212-1, Instructions To Offerors Commercial Products And Commercial Services (sep 2023) Addendum To Far 52.212-1 Instructions To Offerors Commercial Products And Commercial Services Offeror Must Ensure That Proposal Is Submitted Timely To Ensure Delivery And Receipt By The Due Date And Time Identified Herein. Offer Shall Be Submitted Electronically Via Email, To Stephanie.mcfadden@va.gov. In Addition To The Requirements Of Far 52.212-1, Offeror Shall: (a) Complete Provision 52.212-3. Note: An Offeror Needs Only To Complete Paragraph If The Offeror Has Completed The Annual Representations And Certifications Electronically In The System For Award Management Database. Otherwise, Complete Paragraphs (c) Through (o) As Applicable. (b) Offeror Shall Submit A Capability Statement Demonstrating Their Technical Capability And Ability To Meet The Full Scope (all Elements) Of The Statement Of Work. (c) Offeror Shall Submit At Least One Similarly Scoped/relevant Past Performance Reference, Including Both The Reference Information And Details Of The Work Performance; Past Performance Information Shall Be Recent And Relevant Work. Offerors May Submit More Than One Past Performance Reference; Doing So Further Demonstrates The Offeror S Ability To Perform The Work. The Contracting Officer May Also Utilize All Available Records (e.g. Ppiprs And Fapiis) As Well. A Determination Of Contractor Responsibility Will Be Conducted. Provisions That Are Incorporated By Reference (by Citation Number, Title, And Date), Have The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. The Following Provisions Are Incorporated Into 52.212-1 As An Addendum To This Solicitation: 52.252-1 Solicitation Provisions Incorporated By Reference (feb 1998) This Solicitation Incorporates One Or More Solicitation Provisions By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. The Offeror Is Cautioned That The Listed Provisions May Include Blocks That Must Be Completed By The Offeror And Submitted With Its Quotation Or Offer. In Lieu Of Submitting The Full Text Of Those Provisions, The Offeror May Identify The Provision By Paragraph Identifier And Provide The Appropriate Information With Its Quotation Or Offer. Also, The Full Text Of A Solicitation Provision May Be Accessed Electronically At This/these Address(es): Https://www.acquisition.gov/browse/index/far Https://www.va.gov/oal/library/vaar/ (end Of Provision) Far Number Title Date 52.204-7 System For Award Management Nov 2024 52.204-16 Commercial And Government Entity Code Reporting Aug 2020 52.229-11 Tax On Certain Foreign Procurements Notice And Representation Jun 2020 52.204-24 Representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment (nov 2021) The Offeror Shall Not Complete The Representation At Paragraph (d)(1) Of This Provision If The Offeror Has Represented That It Does Not Provide Covered Telecommunications Equipment Or Services As A Part Of Its Offered Products Or Services To The Government In The Performance Of Any Contract, Subcontract, Or Other Contractual Instrument In Paragraph (c)(1) In The Provision At 52.204 26, Covered Telecommunications Equipment Or Services Representation, Or In Paragraph (v)(2)(i) Of The Provision At 52.212 3, Offeror Representations And Certifications Commercial Products And Commercial Services. The Offeror Shall Not Complete The Representation In Paragraph (d)(2) Of This Provision If The Offeror Has Represented That It Does Not Use Covered Telecommunications Equipment Or Services, Or Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services In Paragraph (c)(2) Of The Provision At 52.204 26, Or In Paragraph (v)(2)(ii) Of The Provision At 52.212 3. Definitions. As Used In This Provision Backhaul, Covered Telecommunications Equipment Or Services, Critical Technology, Interconnection Arrangements, Reasonable Inquiry, Roaming, And Substantial Or Essential Component Have The Meanings Provided In The Clause 52.204 25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (b) Prohibition. (1) Section 889(a)(1)(a) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115 232) Prohibits The Head Of An Executive Agency On Or After August 13, 2019, From Procuring Or Obtaining, Or Extending Or Renewing A Contract To Procure Or Obtain, Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. Nothing In The Prohibition Shall Be Construed To (i) Prohibit The Head Of An Executive Agency From Procuring With An Entity To Provide A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or (ii) Cover Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Cannot Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles. (2) Section 889(a)(1)(b) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115 232) Prohibits The Head Of An Executive Agency On Or After August 13, 2020, From Entering Into A Contract Or Extending Or Renewing A Contract With An Entity That Uses Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. This Prohibition Applies To The Use Of Covered Telecommunications Equipment Or Services, Regardless Of Whether That Use Is In Performance Of Work Under A Federal Contract. Nothing In The Prohibition Shall Be Construed To (i) Prohibit The Head Of An Executive Agency From Procuring With An Entity To Provide A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or (ii) Cover Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Cannot Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles. (c) Procedures. The Offeror Shall Review The List Of Excluded Parties In The System For Award Management (sam) (https://www.sam.gov) For Entities Excluded From Receiving Federal Awards For Covered Telecommunications Equipment Or Services. (d) Representations. The Offeror Represents That (1) It [ ] Will, [ ] Will Not Provide Covered Telecommunications Equipment Or Services To The Government In The Performance Of Any Contract, Subcontract Or Other Contractual Instrument Resulting From This Solicitation. The Offeror Shall Provide The Additional Disclosure Information Required At Paragraph (e)(1) Of This Section If The Offeror Responds Will In Paragraph (d)(1) Of This Section; And (2) After Conducting A Reasonable Inquiry, For Purposes Of This Representation, The Offeror Represents That It [ ] Does, [ ] Does Not Use Covered Telecommunications Equipment Or Services, Or Use Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services. The Offeror Shall Provide The Additional Disclosure Information Required At Paragraph (e)(2) Of This Section If The Offeror Responds Does In Paragraph (d)(2) Of This Section. (e) Disclosures. (1) Disclosure For The Representation In Paragraph (d)(1) Of This Provision. If The Offeror Has Responded Will In The Representation In Paragraph (d)(1) Of This Provision, The Offeror Shall Provide The Following Information As Part Of The Offer: (i) For Covered Equipment (a) The Entity That Produced The Covered Telecommunications Equipment (include Entity Name, Unique Entity Identifier, Cage Code, And Whether The Entity Was The Original Equipment Manufacturer (oem) Or A Distributor, If Known); (b) A Description Of All Covered Telecommunications Equipment Offered (include Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); And (c) Explanation Of The Proposed Use Of Covered Telecommunications Equipment And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(1) Of This Provision. (ii) For Covered Services (a) If The Service Is Related To Item Maintenance: A Description Of All Covered Telecommunications Services Offered (include On The Item Being Maintained: Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); Or (b) If Not Associated With Maintenance, The Product Service Code (psc) Of The Service Being Provided; And Explanation Of The Proposed Use Of Covered Telecommunications Services And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(1) Of This Provision. (2) Disclosure For The Representation In Paragraph (d)(2) Of This Provision. If The Offeror Has Responded Does In The Representation In Paragraph (d)(2) Of This Provision, The Offeror Shall Provide The Following Information As Part Of The Offer: (i) For Covered Equipment (a) The Entity That Produced The Covered Telecommunications Equipment (include Entity Name, Unique Entity Identifier, Cage Code, And Whether The Entity Was The Oem Or A Distributor, If Known); (b) A Description Of All Covered Telecommunications Equipment Offered (include Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); And (c) Explanation Of The Proposed Use Of Covered Telecommunications Equipment And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(2) Of This Provision. (ii) For Covered Services (a) If The Service Is Related To Item Maintenance: A Description Of All Covered Telecommunications Services Offered (include On The Item Being Maintained: Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); Or (b) If Not Associated With Maintenance, The Psc Of The Service Being Provided; And Explanation Of The Proposed Use Of Covered Telecommunications Services And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(2) Of This Provision. (end Of Provision) 52.204-26 Covered Telecommunications Equipment Or Services Representation (oct 2020) (a) Definitions. As Used In This Provision, Covered Telecommunications Equipment Or Services And Reasonable Inquiry Have The Meaning Provided In The Clause 52.204-25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (b) Procedures. The Offeror Shall Review The List Of Excluded Parties In The System For Award Management (sam) (https://www.sam.gov) For Entities Excluded From Receiving Federal Awards For Covered Telecommunications Equipment Or Services . (c) Representations. (1) The Offeror Represents That It [ ] Does, [ ] Does Not Provide Covered Telecommunications Equipment Or Services As A Part Of Its Offered Products Or Services To The Government In The Performance Of Any Contract, Subcontract, Or Other Contractual Instrument. (2) After Conducting A Reasonable Inquiry For Purposes Of This Representation, The Offeror Represents That It [ ] Does, [ ] Does Not Use Covered Telecommunications Equipment Or Services, Or Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services. (end Of Provision) 52.204-29 Federal Acquisition Supply Chain Security Act Orders Representation And Disclosures (dec 2023) (a) Definitions. As Used In This Provision, Covered Article, Fascsa Order, Intelligence Community, National Security System, Reasonable Inquiry, Sensitive Compartmented Information, Sensitive Compartmented Information System, And Source Have The Meaning Provided In The Clause 52.204 30, Federal Acquisition Supply Chain Security Act Orders Prohibition. (b) Prohibition. Contractors Are Prohibited From Providing Or Using As Part Of The Performance Of The Contract Any Covered Article, Or Any Products Or Services Produced Or Provided By A Source, If The Prohibition Is Set Out In An Applicable Federal Acquisition Supply Chain Security Act (fascsa) Order, As Described In Paragraph (b)(1) Of Far 52.204 30, Federal Acquisition Supply Chain Security Act Orders Prohibition. (c) Procedures. (1) The Offeror Shall Search For The Phrase Fascsa Order In The System For Award Management (sam)(https://www.sam.gov) For Any Covered Article, Or Any Products Or Services Produced Or Provided By A Source, If There Is An Applicable Fascsa Order Described In Paragraph (b)(1) Of Far 52.204 30, Federal Acquisition Supply Chain Security Act Orders Prohibition. (2) The Offeror Shall Review The Solicitation For Any Fascsa Orders That Are Not In Sam, But Are Effective And Do Apply To The Solicitation And Resultant Contract (see Far 4.2303(c)(2)). (3) Fascsa Orders Issued After The Date Of Solicitation Do Not Apply Unless Added By An Amendment To The Solicitation. (d) Representation. By Submission Of This Offer, The Offeror Represents That It Has Conducted A Reasonable Inquiry, And That The Offeror Does Not Propose To Provide Or Use In Response To This Solicitation Any Covered Article, Or Any Products Or Services Produced Or Provided By A Source, If The Covered Article Or The Source Is Prohibited By An Applicable Fascsa Order In Effect On The Date The Solicitation Was Issued, Except As Waived By The Solicitation, Or As Disclosed In Paragraph (e). (e) Disclosures. The Purpose For This Disclosure Is So The Government May Decide Whether To Issue A Waiver. For Any Covered Article, Or Any Products Or Services Produced Or Provided By A Source, If The Covered Article Or The Source Is Subject To An Applicable Fascsa Order, And The Offeror Is Unable To Represent Compliance, Then The Offeror Shall Provide The Following Information As Part Of The Offer: (1) Name Of The Product Or Service Provided To The Government; (2) Name Of The Covered Article Or Source Subject To A Fascsa Order; (3) If Applicable, Name Of The Vendor, Including The Commercial And Government Entity Code And Unique Entity Identifier (if Known), That Supplied The Covered Article Or The Product Or Service To The Offeror; (4) Brand; (5) Model Number (original Equipment Manufacturer Number, Manufacturer Part Number, Or Wholesaler Number); (6) Item Description; (7) Reason Why The Applicable Covered Article Or The Product Or Service Is Being Provided Or Used; (f) Executive Agency Review Of Disclosures. The Contracting Officer Will Review Disclosures Provided In Paragraph (e) To Determine If Any Waiver May Be Sought. A Contracting Officer May Choose Not To Pursue A Waiver For Covered Articles Or Sources Otherwise Subject To A Fascsa Order And May Instead Make An Award To An Offeror That Does Not Require A Waiver. (end Of Provision) 52.216-1 Type Of Contract (apr 1984) The Government Contemplates Award Of A Firm-fixed-price, Indefinite Quantity Contract Resulting From This Solicitation. (end Of Provision) (end Of Addendum To 52.212-1) 52.212-2 Evaluation Commercial Products And Commercial Services (nov 2021) (a) The Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. The Following Factors Shall Be Used To Evaluate Offers: 1) Technical Capability 2) Past Performance 3) Price (b) Evaluation Approach. The Government Will Evaluate Quotations Using The Comparative Evaluation Process Outlined In Far 13.106-2 (b) (3), Where Quotations Will Be Compared To One Another To Determine Which Provides The Best Benefit To The Government. The Government Reserves The Right To Consider A Quotation Other Than The Lowest Price That Provides Additional Benefit(s). Quotations May Exceed Minimum Requirements Of The Solicitation. The Government Reserves The Right To Select A Quotation That Provides Benefit To The Government That Exceeds The Minimum Requirements Of The Solicitation But Is Not Required To Do So. Each Response Must Meet The Minimum Requirements Of The Solicitation. The Government Is Not Requesting Or Accepting Alternate Quotations. The Evaluation Will Consider The Following: 1) Technical Capability: The Quotation Will Be Evaluated To The Extent To Which It Can Meet And/or Exceed The Government S Requirements As Outlined In The Solicitation And Based On The Information Requested In The Instructions To Quoters Section Of The Solicitation. Please Provide An Explanation Of Your Firm S Ability To Meet And/or Exceed The Technical Aspects Of This Solicitation. 2) Past Performance: Offerors Shall Provide At Least One Relevant Past Performance Reference. The Past Performance Evaluation Will Assess The Relative Risks Associated With A Quoter S Likelihood Of Success In Fulfilling The Solicitation S Requirements As Indicated By The Quoter S Record Of Past Performance. The Past Performance Evaluation May Be Based On The Contracting Officer S Knowledge Of And Previous Experience With The Supply Or Service Being Acquired; Customer Surveys, And Past Performance Questionnaire Replies; Contractor Performance Assessment Reporting System (cpars) At Http://www.cpars.gov/; Or Any Other Reasonable Basis. 3) Price: The Government Will Evaluate The Price By Adding The Total Of All Line-item Prices. The Total Evaluated Price Will Be That Sum. (c) A Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer's Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award. (c) A Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer's Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award. (end Of Provision) Representations And Certifications Electronically Via The System For Award Management (sam) Website Located At Https://www.sam.gov/portal In Accordance With Far 52.212-3, Offerors Representations And Certifications Commercial Products And Commercial Services. If Paragraph (j) Of The Provision Is Applicable, A Written Submission Is Required. The Following Contract Clauses Apply To This Acquisition: Far 52.212-4, Contract Terms And Conditions Commercial Products And Commercial Services (nov 2023) Addendum To Far 52.212-4 Contract Terms And Conditions Commercial Products And Commercial Services Clauses That Are Incorporated By Reference (by Citation Number, Title, And Date), Have The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. The Following Clauses Are Incorporated Into 52.212-4 As An Addendum To This Contract: 52.252-2 Clauses Incorporated By Reference (feb 1998) This Contract Incorporates One Or More Clauses By Reference, With The Same Force And Effect As If They Were Given In Full Text. Upon Request, The Contracting Officer Will Make Their Full Text Available. Also, The Full Text Of A Clause May Be Accessed Electronically At This/these Address(es): Https://www.acquisition.gov/browse/index/far Https://www.va.gov/oal/library/vaar/ (end Of Clause) Far Number Title Date 52.204-13 System For Award Management Maintenance Oct 2018 52.204-18 Commercial And Government Entity Code Maintenance Aug 2020 52.223-2 Reporting Of Biobased Products Under Service And Construction Contracts May 2024 52.237-3 Continuity Of Services Jan 1991 52.216-18 Ordering (aug 2020) (a) Any Supplies And Services To Be Furnished Under This Contract Shall Be Ordered By Issuance Of Delivery Orders Or Task Orders By The Individuals Or Activities Designated In The Schedule. Such Orders May Be Issued From 03/24/2025 Through 03/23/2030. (b) All Delivery Orders Or Task Orders Are Subject To The Terms And Conditions Of This Contract. In The Event Of Conflict Between A Delivery Order Or Task Order And This Contract, The Contract Shall Control. (c) A Delivery Order Or Task Order Is Considered "issued" When (1) If Sent By Mail (includes Transmittal By U.s. Mail Or Private Delivery Service), The Government Deposits The Order In The Mail; (2) If Sent By Fax, The Government Transmits The Order To The Contractor S Fax Number; Or (3) If Sent Electronically, The Government Either (i) Posts A Copy Of The Delivery Order Or Task Order To A Government Document Access System, And Notice Is Sent To The Contractor; Or (ii) Distributes The Delivery Order Or Task Order Via Email To The Contractor S Email Address. (d) Orders May Be Issued By Methods Other Than Those Enumerated In This Clause Only If Authorized In The Contract. (end Of Clause) 52.216-19 Order Limitations (oct 1995) (a) Minimum Order. When The Government Requires Supplies Or Services Covered By This Contract In An Amount Of Less Than $2,500.00, The Government Is Not Obligated To Purchase, Nor Is The Contractor Obligated To Furnish, Those Supplies Or Services Under The Contract. (b) Maximum Order. The Contractor Is Not Obligated To Honor (1) Any Order For A Single Item In Excess Of To Be Determined At Award; (2) Any Order For A Combination Of Items In Excess Of To Be Determined At Award; Or (3) A Series Of Orders From The Same Ordering Office Within 10 Days That Together Call For Quantities Exceeding The Limitation In Paragraph (b)(1) Or (2) Of This Section. (c) If This Is A Requirements Contract (i.e., Includes The Requirements Clause At Subsection 52.216-21 Of The Federal Acquisition Regulation (far)), The Government Is Not Required To Order A Part Of Any One Requirement From The Contractor If That Requirement Exceeds The Maximum-order Limitations In Paragraph (b) Of This Section. (d) Notwithstanding Paragraphs (b) And (c) Of This Section, The Contractor Shall Honor Any Order Exceeding The Maximum Order Limitations In Paragraph (b), Unless That Order (or Orders) Is Returned To The Ordering Office Within 5 Days After Issuance, With Written Notice Stating The Contractor's Intent Not To Ship The Item (or Items) Called For And The Reasons. Upon Receiving This Notice, The Government May Acquire The Supplies Or Services From Another Source. (end Of Clause) 52.216-21 Requirements (oct 1995) (a) This Is A Requirements Contract For The Supplies Or Services Specified, And Effective For The Period Stated, In The Schedule. The Quantities Of Supplies Or Services Specified In The Schedule Are Estimates Only And Are Not Purchased By This Contract. Except As This Contract May Otherwise Provide, If The Government's Requirements Do Not Result In Orders In The Quantities Described As "estimated" Or "maximum" In The Schedule, That Fact Shall Not Constitute The Basis For An Equitable Price Adjustment. (b) Delivery Or Performance Shall Be Made Only As Authorized By Orders Issued In Accordance With The Ordering Clause. Subject To Any Limitations In The Order Limitations Clause Or Elsewhere In This Contract, The Contractor Shall Furnish To The Government All Supplies Or Services Specified In The Schedule And Called For By Orders Issued In Accordance With The Ordering Clause. The Government May Issue Orders Requiring Delivery To Multiple Destinations Or Performance At Multiple Locations. (c) Except As This Contract Otherwise Provides, The Government Shall Order From The Contractor All The Supplies Or Services Specified In The Schedule That Are Required To Be Purchased By The Government Activity Or Activities Specified In The Schedule. (d) The Government Is Not Required To Purchase From The Contractor Requirements In Excess Of Any Limit On Total Orders Under This Contract. (e) If The Government Urgently Requires Delivery Of Any Quantity Of An Item Before The Earliest Date That Delivery May Be Specified Under This Contract, And If The Contractor Will Not Accept An Order Providing For The Accelerated Delivery, The Government May Acquire The Urgently Required Goods Or Services From Another Source. (f) Any Order Issued During The Effective Period Of This Contract And Not Completed Within That Period Shall Be Completed By The Contractor Within The Time Specified In The Order. The Contract Shall Govern The Contractor's And Government's Rights And Obligations With Respect To That Order To The Same Extent As If The Order Were Completed During The Contract's Effective Period; Provided, That The Contractor Shall Not Be Required To Make Any Deliveries Under This Contract After 03/23/2030. (end Of Clause) 52.216-22 Indefinite Quantity (oct 1995) (a) This Is An Indefinite-quantity Contract For The Supplies Or Services Specified, And Effective For The Period Stated, In The Schedule. The Quantities Of Supplies And Services Specified In The Schedule Are Estimates Only And Are Not Purchased By This Contract. (b) Delivery Or Performance Shall Be Made Only As Authorized By Orders Issued In Accordance With The Ordering Clause. The Contractor Shall Furnish To The Government, When And If Ordered, The Supplies Or Services Specified In The Schedule Up To And Including The Quantity Designated In The Schedule As The "maximum." The Government Shall Order At Least The Quantity Of Supplies Or Services Designated In The Schedule As The "minimum." (c) Except For Any Limitations On Quantities In The Order Limitations Clause Or In The Schedule, There Is No Limit On The Number Of Orders That May Be Issued. The Government May Issue Orders Requiring Delivery To Multiple Destinations Or Performance At Multiple Locations. (d) Any Order Issued During The Effective Period Of This Contract And Not Completed Within That Period Shall Be Completed By The Contractor Within The Time Specified In The Order. The Contract Shall Govern The Contractor's And Government's Rights And Obligations With Respect To That Order To The Same Extent As If The Order Were Completed During The Contract's Effective Period; Provided, That The Contractor Shall Not Be Required To Make Any Deliveries Under This Contract After 03/23/2030. (end Of Clause) Vaar 852.203-70 Commercial Advertising (may 2018) The Contractor Shall Not Make Reference In Its Commercial Advertising To Department Of Veterans Affairs Contracts In A Manner That States Or Implies The Department Of Veterans Affairs Approves Or Endorses The Contractor S Products Or Services Or Considers The Contractor S Products Or Services Superior To Other Products Or Services. (end Of Clause) Vaar 852.232-72 Electronic Submission Of Payment Requests (nov 2018) (a) Definitions. As Used In This Clause (1) Contract Financing Payment Has The Meaning Given In Far 32.001; (2) Designated Agency Office Means The Office Designated By The Purchase Order, Agreement, Or Contract To First Receive And Review Invoices. This Office Can Be Contractually Designated As The Receiving Entity. This Office May Be Different From The Office Issuing The Payment; (3) Electronic Form Means An Automated System Transmitting Information Electronically According To The Accepted Electronic Data Transmission Methods And Formats Identified In Paragraph (c) Of This Clause. Facsimile, Email, And Scanned Documents Are Not Acceptable Electronic Forms For Submission Of Payment Requests; (4) Invoice Payment Has The Meaning Given In Far 32.001; And (5) Payment Request Means Any Request For Contract Financing Payment Or Invoice Payment Submitted By The Contractor Under This Contract. (b) Electronic Payment Requests. Except As Provided In Paragraph (e) Of This Clause, The Contractor Shall Submit Payment Requests In Electronic Form. Purchases Paid With A Government-wide Commercial Purchase Card Are Considered To Be An Electronic Transaction For Purposes Of This Rule, And Therefore No Additional Electronic Invoice Submission Is Required. (c) Data Transmission. A Contractor Must Ensure That The Data Transmission Method And Format Are Through One Of The Following: (1) Va S Electronic Invoice Presentment And Payment System At The Current Website Address Provided In The Contract. (2) Any System That Conforms To The X12 Electronic Data Interchange (edi) Formats Established By The Accredited Standards Center (asc) And Chartered By The American National Standards Institute (ansi). (d) Invoice Requirements. Invoices Shall Comply With Far 32.905. (e) Exceptions. If, Based On One Of The Circumstances In This Paragraph (e), The Contracting Officer Directs That Payment Requests Be Made By Mail, The Contractor Shall Submit Payment Requests By Mail Through The United States Postal Service To The Designated Agency Office. Submission Of Payment Requests By Mail May Be Required For (1) Awards Made To Foreign Vendors For Work Performed Outside The United States; (2) Classified Contracts Or Purchases When Electronic Submission And Processing Of Payment Requests Could Compromise The Safeguarding Of Classified Or Privacy Information; (3) Contracts Awarded By Contracting Officers In The Conduct Of Emergency Operations, Such As Responses To National Emergencies; (4) Solicitations Or Contracts In Which The Designated Agency Office Is A Va Entity Other Than The Va Financial Services Center In Austin, Texas; Or (5) Solicitations Or Contracts In Which The Va Designated Agency Office Does Not Have Electronic Invoicing Capability As Described Above. (end Of Clause) Vaar 852.242-71 Administrative Contracting Officer (oct 2020) The Contracting Officer Reserves The Right To Designate An Administrative Contracting Officer (aco) For The Purpose Of Performing Certain Tasks/duties In The Administration Of The Contract. Such Designation Will Be In Writing Through An Aco Letter Of Delegation And Will Identify The Responsibilities And Limitations Of The Aco. A Copy Of The Aco Letter Of Delegation Will Be Furnished To The Contractor. (end Of Clause) (end Of Addendum To 52.212-4) 52.212-5 Contract Terms And Conditions Required To Implement Statutes Or Executive Orders Commercial Products And Commercial Services (nov 2024) (a) The Contractor Shall Comply With The Following Federal Acquisition Regulation (far) Clauses, Which Are Incorporated In This Contract By Reference, To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services: (1) 52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (2) 52.204 23, Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities (dec 2023) (section 1634 Of Pub. L. 115 91). (3) 52.204 25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (nov 2021) (section 889(a)(1)(a) Of Pub. L. 115 232). (4) 52.209-10, Prohibition On Contracting With Inverted Domestic Corporations (nov 2015). (5) 52.232 40, Providing Accelerated Payments To Small Business Subcontractors (mar 2023) (31 U.s.c. 3903 And 10 U.s.c. 3801). (6) 52.233-3, Protest After Award (aug 1996) (31 U.s.c. 3553). (7) 52.233-4, Applicable Law For Breach Of Contract Claim (oct 2004) (public Laws 108-77 And 108-78 (19 U.s.c. 3805 Note)). (b) The Contractor Shall Comply With The Far Clauses In This Paragraph (b) That The Contracting Officer Has Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services: [] (1) 52.203 6, Restrictions On Subcontractor Sales To The Government (jun 2020), With Alternate I (nov 2021) (41 U.s.c. 4704 And 10 U.s.c. 4655). [] (2) 52.203 13, Contractor Code Of Business Ethics And Conduct (nov 2021) (41 U.s.c. 3509). [] (3) 52.203 15, Whistleblower Protections Under The American Recovery And Reinvestment Act Of 2009 (jun 2010) (section 1553 Of Pub. L. 111-5). (applies To Contracts Funded By The American Recovery And Reinvestment Act Of 2009.) [x] (4) 52.203 17, Contractor Employee Whistleblower Rights (nov 2023) (41 U.s.c. 4712); This Clause Does Not Apply To Contracts Of Dod, Nasa, The Coast Guard, Or Applicable Elements Of The Intelligence Community See Far 3.900(a). [x] (5) 52.204 10, Reporting Executive Compensation And First-tier Subcontract Awards (jun 2020) (pub. L. 109 282) (31 U.s.c. 6101 Note). [] (6) [reserved] [] (7) 52.204 14, Service Contract Reporting Requirements (oct 2016) (pub. L. 111 117, Section 743 Of Div. C). [] (8) 52.204 15, Service Contract Reporting Requirements For Indefinite-delivery Contracts (oct 2016) (pub. L. 111 117, Section 743 Of Div. C). [x] (9) 52.204 27, Prohibition On A Bytedance Covered Application (jun 2023) (section 102 Of Division R Of Pub. L. 117 328). [] (10) 52.204 28, Federal Acquisition Supply Chain Security Act Orders Federal Supply Schedules, Governmentwide Acquisition Contracts, And Multi-agency Contracts. (dec 2023) (pub. L. 115 390, Title Ii). [x] (11)(i) 52.204 30, Federal Acquisition Supply Chain Security Act Orders Prohibition. (dec 2023) (pub. L. 115 390, Title Ii). [] (ii) Alternate I (dec 2023) Of 52.204 30. [x] (12) 52.209 6, Protecting The Government S Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment. (nov 2021) (31 U.s.c. 6101 Note). [] (13) 52.209-9, Updates Of Publicly Available Information Regarding Responsibility Matters (oct 2018) (41 U.s.c. 2313). [] (14) [reserved] [] (15) 52.219 3, Notice Of Hubzone Set-aside Or Sole-source Award (oct 2022) (15 U.s.c. 657a). [x] (16) 52.219 4, Notice Of Price Evaluation Preference For Hubzone Small Business Concerns (oct 2022) (if The Offeror Elects To Waive The Preference, It Shall So Indicate In Its Offer) (15 U.s.c. 657a). [] (17) [reserved] [] (18)(i) 52.219-6, Notice Of Total Small Business Set-aside (nov 2020) (15 U.s.c. 644). [] (ii) Alternate I (mar 2020) Of 52.219-6. [] (19)(i) 52.219-7, Notice Of Partial Small Business Set-aside (nov 2020) (15 U.s.c. 644). [] (ii) Alternate I (mar 2020) Of 52.219-7. [] (20) 52.219-8, Utilization Of Small Business Concerns (feb 2024) (15 U.s.c. 637(d)(2) And (3)). [] (21)(i) 52.219 9, Small Business Subcontracting Plan (sep 2023) (15 U.s.c. 637(d)(4)). [] (ii) Alternate I (nov 2016) Of 52.219-9. [] (iii) Alternate Ii (nov 2016) Of 52.219-9. [] (iv) Alternate Iii (jun 2020) Of 52.219 9. [] (v) Alternate Iv (sep 2023) Of 52.219 9. [] (22)(i) 52.219-13, Notice Of Set-aside Of Orders (mar 2020) (15 U.s.c. 644(r)). [] (ii) Alternate I (mar 2020) Of 52.219-13. [] (23) 52.219 14, Limitations On Subcontracting (oct 2022) (15 U.s.c. 657s). [] (24) 52.219-16, Liquidated Damages Subcontracting Plan (sep 2021) (15 U.s.c. 637(d)(4)(f)(i)). [] (25) 52.219 27, Notice Of Set-aside For, Or Sole-source Award To, Service-disabled Veteran-owned Small Business (sdvosb) Concerns Eligible Under The Sdvosb Program (feb 2024) (15 U.s.c. 657f). [x] (26) (i) 52.219 28, Post-award Small Business Program Representation (feb 2024) (15 U.s.c. 632(a)(2)). [] (ii) Alternate I (mar 2020) Of 52.219 28. [] (27) 52.219 29, Notice Of Set-aside For, Or Sole-source Award To, Economically Disadvantaged Women-owned Small Business Concerns (oct 2022) (15 U.s.c. 637(m)). [] (28) 52.219 30, Notice Of Set-aside For, Or Sole-source Award To, Women-owned Small Business Concerns Eligible Under The Women-owned Small Business Program (oct 2022) (15 U.s.c. 637(m)). [] (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (mar 2020) (15 U.s.c. 644(r)). [] (30) 52.219 33, Nonmanufacturer Rule (sep 2021) (15 U.s.c. 657s). [x] (31) 52.222-3, Convict Labor (jun 2003) (e.o. 11755). [] (32) 52.222 19, Child Labor Cooperation With Authorities And Remedies (feb 2024) (e.o. 13126). [x] (33) 52.222-21, Prohibition Of Segregated Facilities (apr 2015). [x] (34)(i) 52.222 26, Equal Opportunity (sep 2016) (e.o. 11246). [] (ii) Alternate I (feb 1999) Of 52.222-26. [x] (35)(i) 52.222 35, Equal Opportunity For Veterans (jun 2020) (38 U.s.c. 4212). [] (ii) Alternate I (jul 2014) Of 52.222-35. [x] (36)(i) 52.222 36, Equal Opportunity For Workers With Disabilities (jun 2020) (29 U.s.c. 793). [] (ii) Alternate I (jul 2014) Of 52.222-36. [x] (37) 52.222 37, Employment Reports On Veterans (jun 2020) (38 U.s.c. 4212). [] (38) 52.222-40, Notification Of Employee Rights Under The National Labor Relations Act (dec 2010) (e.o. 13496). [x] (39)(i) 52.222-50, Combating Trafficking In Persons (nov 2021) (22 U.s.c. Chapter 78 And E.o. 13627). [] (ii) Alternate I (mar 2015) Of 52.222-50 (22 U.s.c. Chapter 78 And E.o. 13627). [x] (40) 52.222-54, Employment Eligibility Verification (may 2022). (e. O. 12989). (not Applicable To The Acquisition Of Commercially Available Off-the-shelf Items Or Certain Other Types Of Commercial Products Or Commercial Services As Prescribed In Far 22.1803.) [] (41)(i) 52.223-9, Estimate Of Percentage Of Recovered Material Content For Epa-designated Items (may 2008) (42 U.s.c.6962(c)(3)(a)(ii)). (not Applicable To The Acquisition Of Commercially Available Off-the-shelf Items.) [] (ii) Alternate I (may 2008) Of 52.223-9 (42 U.s.c. 6962(i)(2)(c)). (not Applicable To The Acquisition Of Commercially Available Off-the-shelf Items.) [] (42) 52.223-11, Ozone-depleting Substances And High Global Warming Potential Hydrofluorocarbons (may 2024) (42 U.s.c. 7671, Et Seq.). [] (43) 52.223-12, Maintenance, Service, Repair, Or Disposal Of Refrigeration Equipment And Air Conditioners (may 2024) (42 U.s.c. 7671, Et Seq.). [] (44) 52.223-20, Aerosols. (may 2024) (42 U.s.c. 7671, Et Seq.). [] (45) 52.223-21, Foams (may 2024). (42 U.s.c. 7671, Et Seq.). [x] (46) 52.223-23, Sustainable Products And Services (may 2024) (e.o. 14057, 7 U.s.c. 8102, 42 U.s.c. 6962, 42 U.s.c. 8259b, And 42 U.s.c. 7671i). [] (47)(i) 52.224-3, Privacy Training (jan 2017) (5 U.s.c. 552a). [] (ii) Alternate I (jan 2017) Of 52.224-3. [] (48)(i) 52.225-1, Buy American Supplies (oct 2022) (41 U.s.c. Chapter 83). [] (ii) Alternate I (oct 2022) Of 52.225-1. [x] (49)(i) 52.225-3, Buy American Free Trade Agreements Israeli Trade Act (nov 2023) (19 U.s.c. 3301 Note, 19 U.s.c. 2112 Note, 19 U.s.c. 3805 Note, 19 U.s.c. 4001 Note, 19 U.s.c. Chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, And 112-43. [] (ii) Alternate I [reserved]. [] (iii) Alternate Ii (dec 2022) Of 52.225-3. [] (iv) Alternate Iii (feb 2024) Of 52.225-3. [] (v) Alternate Iv (oct 2022) Of 52.225-3. [] (50) 52.225 5, Trade Agreements (nov 2023) (19 U.s.c. 2501, Et Seq., 19 U.s.c. 3301 Note [x] (51) 52.225-13, Restrictions On Certain Foreign Purchases (feb 2021) (e.o.'s, Proclamations, And Statutes Administered By The Office Of Foreign Assets Control Of The Department Of The Treasury). [] (52) 52.225 26, Contractors Performing Private Security Functions Outside The United States (oct 2016) (section 862, As Amended, Of The National Defense Authorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). [] (53) 52.226-4, Notice Of Disaster Or Emergency Area Set-aside (nov 2007) (42 U.s.c. 5150). [] (54) 52.226-5, Restrictions On Subcontracting Outside Disaster Or Emergency Area (nov 2007) (42 U.s.c. 5150). [x] (55) 52.226-8, Encouraging Contractor Policies To Ban Text Messaging While Driving (may 2024) (e.o. 13513) [x] (56) 52.229 12, Tax On Certain Foreign Procurements (feb 2021). [] (57) 52.232-29, Terms For Financing Of Purchases Of Commercial Products And Commercial Services (nov 2021) (41 U.s.c. 4505, 10 U.s.c. 3805). [] (58) 52.232-30, Installment Payments For Commercial Products And Commercial Services (nov 2021) (41 U.s.c. 4505, 10 U.s.c. 3805). [x] (59) 52.232-33, Payment By Electronic Funds Transfer System For Award Management (oct 2018) (31 U.s.c. 3332). [] (60) 52.232-34, Payment By Electronic Funds Transfer Other Than System For Award Management (jul 2013) (31 U.s.c. 3332). [] (61) 52.232-36, Payment By Third Party (may 2014) (31 U.s.c. 3332). [] (62) 52.239-1, Privacy Or Security Safeguards (aug 1996) (5 U.s.c. 552a). [x] (63) 52.240 1, Prohibition On Unmanned Aircraft Systems Manufactured Or Assembled By American Security Drone Act Covered Foreign Entities (nov 2024) (sections 1821 1826, Pub. L. 118 31, 41 U.s.c. 3901 Note Prec.). [] (64) 52.242-5, Payments To Small Business Subcontractors (jan 2017)(15 U.s.c. 637(d)(13)). [] (65)(i) 52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels (nov 2021) (46 U.s.c. 55305 And 10 U.s.c. 2631). [] (ii) Alternate I (apr 2003) Of 52.247-64. [] (iii) Alternate Ii (nov 2021) Of 52.247-64. (c) The Contractor Shall Comply With The Far Clauses In This Paragraph (c), Applicable To Commercial Services, That The Contracting Officer Has Indicated As Being Incorporated In This Contract By Reference To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services: [x] (1) 52.222-41, Service Contract Labor Standards (aug 2018) (41 U.s.c. Chapter 67). [x] (2) 52.222-42, Statement Of Equivalent Rates For Federal Hires (may 2014) (29 U.s.c. 206 And 41 U.s.c. Chapter 67). Employee Class Monetary Wage-fringe Benefits [x] (3) 52.222-43, Fair Labor Standards Act And Service Contract Labor Standards Price Adjustment (multiple Year And Option Contracts) (aug 2018) (29 U.s.c. 206 And 41 U.s.c. Chapter 67). [] (4) 52.222-44, Fair Labor Standards Act And Service Contract Labor Standards Price Adjustment (may 2014) (29 U.s.c 206 And 41 U.s.c. Chapter 67). [] (5) 52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment Requirements (may 2014) (41 U.s.c. Chapter 67). [] (6) 52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services Requirements (may 2014) (41 U.s.c. Chapter 67). [x] (7) 52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026 (jan 2022). [x] (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (jan 2022) (e.o. 13706). [] (9) 52.226 6, Promoting Excess Food Donation To Nonprofit Organizations (jun 2020) (42 U.s.c. 1792). (d) Comptroller General Examination Of Record. The Contractor Shall Comply With The Provisions Of This Paragraph (d) If This Contract Was Awarded Using Other Than Sealed Bid, Is In Excess Of The Simplified Acquisition Threshold, As Defined In Far 2.101, On The Date Of Award Of This Contract, And Does Not Contain The Clause At 52.215-2, Audit And Records Negotiation. (1) The Comptroller General Of The United States, Or An Authorized Representative Of The Comptroller General, Shall Have Access To And Right To Examine Any Of The Contractor's Directly Pertinent Records Involving Transactions Related To This Contract. (2) The Contractor Shall Make Available At Its Offices At All Reasonable Times The Records, Materials, And Other Evidence For Examination, Audit, Or Reproduction, Until 3 Years After Final Payment Under This Contract Or For Any Shorter Period Specified In Far Subpart 4.7, Contractor Records Retention, Of The Other Clauses Of This Contract. If This Contract Is Completely Or Partially Terminated, The Records Relating To The Work Terminated Shall Be Made Available For 3 Years After Any Resulting Final Termination Settlement. Records Relating To Appeals Under The Disputes Clause Or To Litigation Or The Settlement Of Claims Arising Under Or Relating To This Contract Shall Be Made Available Until Such Appeals, Litigation, Or Claims Are Finally Resolved. (3) As Used In This Clause, Records Include Books, Documents, Accounting Procedures And Practices, And Other Data, Regardless Of Type And Regardless Of Form. This Does Not Require The Contractor To Create Or Maintain Any Record That The Contractor Does Not Maintain In The Ordinary Course Of Business Or Pursuant To A Provision Of Law. (e)(1) Notwithstanding The Requirements Of The Clauses In Paragraphs (a), (b), (c), And (d) Of This Clause, The Contractor Is Not Required To Flow Down Any Far Clause, Other Than Those In This Paragraph (e)(1) In A Subcontract For Commercial Products Or Commercial Services. Unless Otherwise Indicated Below, The Extent Of The Flow Down Shall Be As Required By The Clause (i) 52.203 13, Contractor Code Of Business Ethics And Conduct (nov 2021) (41 U.s.c. 3509). (ii) 52.203 17, Contractor Employee Whistleblower Rights (nov 2023) (41 U.s.c. 4712). (iii) 52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E, Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (iv) 52.204 23, Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities (dec 2023) (section 1634 Of Pub. L. 115 91). (v) 52.204 25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (nov 2021) (section 889(a)(1)(a) Of Pub. L. 115 232). (vi) 52.204 27, Prohibition On A Bytedance Covered Application (jun 2023) (section 102 Of Division R Of Pub. L. 117 328). (vii) (a) 52.204 30, Federal Acquisition Supply Chain Security Act Orders Prohibition. (dec 2023) (pub. L. 115 390, Title Ii). (b) Alternate I (dec 2023) Of 52.204 30. (viii) 52.219 8, Utilization Of Small Business Concerns (feb 2024) (15 U.s.c. 637(d)(2) And (3)), In All Subcontracts That Offer Further Subcontracting Opportunities. If The Subcontract (except Subcontracts To Small Business Concerns) Exceeds The Applicable Threshold Specified In Far 19.702(a) On The Date Of Subcontract Award, The Subcontractor Must Include 52.219 8 In Lower Tier Subcontracts That Offer Subcontracting Opportunities. (ix) 52.222-21, Prohibition Of Segregated Facilities (apr 2015). (x) 52.222 26, Equal Opportunity (sep 2016) (e.o. 11246). (xi) 52.222 35, Equal Opportunity For Veterans (jun 2020) (38 U.s.c. 4212). (xii) 52.222 36, Equal Opportunity For Workers With Disabilities (jun 2020) (29 U.s.c. 793). (xiii) 52.222 37, Employment Reports On Veterans (jun 2020) (38 U.s.c. 4212). (xiv) 52.222-40, Notification Of Employee Rights Under The National Labor Relations Act (dec 2010) (e.o. 13496). Flow Down Required In Accordance With Paragraph (f) Of Far Clause 52.222-40. (xv) 52.222-41, Service Contract Labor Standards (aug 2018) (41 U.s.c. Chapter 67). (xvi)(a) 52.222-50, Combating Trafficking In Persons (nov 2021) (22 U.s.c. Chapter 78 And E.o. 13627). (b) Alternate I (mar 2015) Of 52.222-50 (22 U.s.c. Chapter 78 And E.o. 13627). (xvii) 52.222-51, Exemption From Application Of The Service Contract Labor Standards To Contracts For Maintenance, Calibration, Or Repair Of Certain Equipment Requirements (may 2014) (41 U.s.c. Chapter 67). (xviii) 52.222-53, Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services Requirements (may 2014) (41 U.s.c. Chapter 67). (xix) 52.222-54, Employment Eligibility Verification (may 2022) (e. O. 12989). (xx) 52.222-55, Minimum Wages For Contractor Workers Under Executive Order 14026 (jan 2022). (xxi) 52.222-62 Paid Sick Leave Under Executive Order 13706 (jan 2022) (e.o. 13706). (xxii)(a) 52.224-3, Privacy Training (jan 2017) (5 U.s.c. 552a). (b) Alternate I (jan 2017) Of 52.224-3. (xxiii) 52.225 26, Contractors Performing Private Security Functions Outside The United States (oct 2016) (section 862, As Amended, Of The National Defense Authorization Act For Fiscal Year 2008; 10 U.s.c. Subtitle A, Part V, Subpart G Note). (xxiv) 52.226 6, Promoting Excess Food Donation To Nonprofit Organizations (jun 2020) (42 U.s.c. 1792). Flow Down Required In Accordance With Paragraph (e) Of Far Clause 52.226-6. (xxv) 52.232 40, Providing Accelerated Payments To Small Business Subcontractors (mar 2023) (31 U.s.c. 3903 And 10 U.s.c. 3801). Flow Down Required In Accordance With Paragraph (c) Of 52.232 40. (xxvi) 52.240 1, Prohibition On Unmanned Aircraft Systems Manufactured Or Assembled By American Security Drone Act Covered Foreign Entities (nov 2024) (sections 1821 1826, Pub. L. 118 31, 41 U.s.c.3901 Note Prec.). (xxvii) 52.247-64, Preference For Privately Owned U.s.-flag Commercial Vessels (nov 2021) (46 U.s.c. 55305 And 10 U.s.c. 2631). Flow Down Required In Accordance With Paragraph (d) Of Far Clause 52.247-64. (2) While Not Required, The Contractor May Include In Its Subcontracts For Commercial Products And Commercial Services A Minimal Number Of Additional Clauses Necessary To Satisfy Its Contractual Obligations. (end Of Clause) Section F: Additional Information Award Will Be Based Upon A Comparative Evaluation Of Quotes In Accordance With The Simplified Acquisition Procedures Of Far 13. Comparative Evaluation Is The Side By Side Pairwise Comparison Of Quotes Based On Factors Resulting In A Contracting Officer Decision For The Quote Most Favorable To The Government. The Following Are The Decision Factors: - Price - Technical Capability - Past Performance The Award Will Be Made To The Response Most Advantageous To The Government. Responses Should Contain Your Best Terms, Conditions. To Facilitate The Award Process, All Quotes Must Include A Statement Regarding The Terms And Conditions Herein As Follows: "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document Without Modification, Deletion, Or Addition." Or "the Terms And Conditions In The Solicitation Are Acceptable To Be Included In The Award Document With The Exception, Deletion, Or Addition Of The Following:" Quoters Shall List Exception(s) And Rationale For The Exception(s), If Any. Questions Questions In Response To This Notice Shall Be Submitted Via Email Only To Stephanie Mcfadden At Stephanie.mcfadden@va.gov, No Later Than 1:00pm, Et, Monday, January 27, 2025. Questions May Or May Not Result In An Extension Of The Solicitation. Sources Sought 36c24425q0230 Must Be Included In The Subject Line Of The Email. Due Date Submission Of Your Response Shall Be Submitted Via Email Only To Stephanie Mcfadden At Stephanie.mcfadden@va.gov, No Later Than 1:00pm, Thursday, February 13, 2025. Sources Sought 36c24425q0230 Must Be Included In The Subject Line Of The Email. Late Submissions Shall Be Treated In Accordance With The Solicitation Provision At Far 52.212-1(f). The Response Shall Demonstrate The Ability To Meet The Requirements In The Solicitation. Specifically, Through Past Performances Of Providing Uniform Rental, Repair And Laundering Services To The Va Or Other Government Agencies. Quotes Shall Clearly And Completely Address The Technical Elements Listed In The Sow. Responses To These Elements Will Form The Basis Of Determining The Technical Acceptability Of The Quote. A Quote May Be Considered Not Technically Acceptable If Inadequate Or Insufficient Information Is Submitted, Which May Exclude The Quote From Further Consideration. Government May Make Award Based On The Initial Quotes Received; Therefore, An Offeror Should Submit Its Best Pricing With Its Quote. Pricing Submitted In Offeror Quote Shall Be Listed As Five Separate Line Items: One For Each Ordering Period As Outlined In Sow. Offerors Are Hereby Advised That Any Offeror-imposed Terms And Conditions That Deviate From The Government S Material Terms And Conditions Established By The Solicitation May Render The Quote Unacceptable And, Therefore, Ineligible For Award. The Government Intends To Issue A Single Award Resulting From This Solicitation. Attachments
Closing Date13 Feb 2025
Tender AmountRefer Documents 

South Eastern Railway - SER Tender

Services
Ireps
India
Tender Id: E-Dy-WW-Housekeeping-24-WAGONSHOP-KGP-MECHANICAL/SOUTH EASTERN RLY | Cleaning/up-keeping Of Shop Floors/offices/yard & Disposal Of Garbages/scrap For Poh Of Wagon At Wagon Repair Shop, Kharagpur
Closing Date21 Jan 2025
Tender AmountINR 24 Million (USD 277.9 K)
841-850 of 848 archived Tenders