Fire Tenders
Fire Tenders
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+1Building Construction
Corrigendum : Closing Date Modified
United States
Details: Scope:provide Construction Services For The Renovate Halls, Walls, And Ceilings Of Ground Floor Building 1 Project, Including Interior Finishes, Hazardous Material Remediation In Sections Of The Ground Floor Construction Space And All Associated Work As Per Attached Plans And Specifications At Durham, Nc Va Medical Center.
background:ground Floor Consists Of Some Original Finishes And Some Refinished Surfaces. Unknown Of Last Renovation Date. The Ground Floor Is Outdated And In Desperate Need Of Renovation And Repair. Pictures And Descriptions Of Existing Conditions Can Be Found In The Drawings And Specifications Provided.
general: Work Includes, But Is Not Limited To Alterations, Architectural, Demolition, Asbestos Abatement, Interior Finishes, Hvac, And Electrical Work, And Certain Other Items To Install New Finishes. Trades Needed To Complete Work Include Hvac, Electrical, Fire Protection, Carpenter, And Any Other Trades Deemed Necessary By The Contractor Will Be Obtained To Complete The Construction As Required By Plans And Specifications. Contractor Shall Completely Prepare Site For Building Operations, Including Demolition And Removal Of Existing Finishes, Remediation Of Substrates To Receive New Finishes, And Installation Of New Finishes In Building 1 On The Ground Floor As Required By Drawings And Specifications.
offers Should Consider The Availability Of Materials And Cost Of Materials For Finishes Prior To Submitting A Bid.
place Of Performance:tasks Will Be Performed At The Va Medical Center, Durham, Nc 27705.
business Hours: Normal Business Hours Are Monday Through Friday From 8am To 4:30pm. Work Will Be Completed Outside Of Normal Business Hours. On Page 26 Of Specs The Allowed Work Hours Are Stated For Each Phase. This Facility Is In Operation 24 Hours A Day, And The Schedule Will Keep The Construction Work To Times Of Lower Traffic.
phasing: Project Construction Will Be Phased As Indicated In Drawings And Specifications. Work Will Be Scheduled To Minimize The Disruption To The Medical Center And Other Contractors.
all Work Is To Be Performed Outside Of Normal Business Hours Unless Otherwise Noted In Construction Documents. Work Shall Be Coordinated With The Va Contracting Officers Representative (cor) In Advance To Minimize Disruption Of Facility Operations. Deviations Or Change Requests To Work Hours Must Be Approved Through The Cor.
no Work Is To Be Performed On Federal Holidays Without Written Permission Of Cor.
utility Outages Shall Be Performed Outside Of Normal Business Hours Unless Approved By The Cor. All Outages Shall Be Scheduled Through The Cor And Approved By The Medical Center Prior To Taking Place. Outages Must Be Requested In Writing A Minimum Of 14 Days In Advance. The Va Has The Right To Cancel All Outages At The Last Moment Without Notice Due To Patient Safety Related Issues, Severe Weather, Electrical Power Outages Or Other Concerns Deemed Important. The Contractor Shall Create, Present, And Have A Cor Approved Work Plan Prior To Commencing With Any Work. Work Plan Shall List All Steps To Be Taken For Removing Each Piece Of Equipment From Service, Steps To Be Taken For Installation, And Steps To Be Taken In Case Of An Emergency.
Closing Date18 Mar 2025
Tender AmountRefer Documents
Presidency Of The Consortium For The Fire Prevention And Extinction And Rescue Service Of The Province Of Valencia Tender
Corrigendum : Closing Date Modified
Spain
Purchaser Name: Presidency Of The Consortium For The Fire Prevention And Extinction And Rescue Service Of The Province | Description: Interior Renovation Works at the Silla, Catarroja, Cullera and Oliva Fire Stations of the Valencia Provincial Firefighters Consortium.
Closing Date1 Nov 2025
Tender AmountEUR 19.7 Million (USD 20.6 Million)
Alberta Public Sector Tender
Canada
Details: Are You A Contractor Interested In Working With Alberta Forestry And Parks’ (fp) Wildfire Compliance And Investigation Unit For The 2024-2026 Wildfire Seasons? Contracts For Wildfire Investigation Services Are Now Available For The Upcoming Wildfire Seasons, Which Run From March 1 To October 31 Annually. The Following Will Provide You With General Information On The Terms, Conditions, And Requirements Of Departmental Contracts. The Forestry Division, Which Is Responsible For The Investigation Of Wildfires Within The Forest Protection Area (fpa) Of Alberta, Requires Contracted Wildfire Investigators To Conduct Wildfire Investigations, Assist With Wildfire Investigations, Assist In Providing Training Related To Investigations, And Assist In Field Research Projects. Contracted Investigators Should Possess Training And Experience In Wildfire Origin And Cause Determination, As Well As Investigation Skills Such As Interviewing And Evidence Collection. There Is No Guarantee Of Work Under The Terms Of The Wildfire Investigations Services Contract. Contractors Will Be Hired On An As-needed Basis, Based On The Specific Requirements Of An Investigation. The Contractor Shall Provide Experienced Staff, Fully Equipped With All Necessary Equipment And Supplies. They May Be Required To Travel Throughout The Province On Short Notice. Any Staff Provided By The Contractor Shall Have A Certificate Of Completion Of For The Fi-210 Wildfire Origin And Cause Determination Course. In Addition To The Required Training, The Contractor’s Staff Must Have At Least Five (5) Years In Wildland, Or Structural, Fire Investigation. With Approval From The Province, Contractor Staff Without Fi-210 Training May Accompany Trained Staff On Investigations In Order To Gain Experience. Upon Completion Of Fi-210 Training, They Will Be Paid The Standard Rate. Contractors Will Be Required To Complete The Wildfire Orientation Course Online Before Working On An Active Wildfire. In Some Circumstances, Contractors Will Be Required To Hold A Cor/secor To Be Eligible To Work On Certain Wildfires.
Closing Date30 Jun 2026
Tender AmountRefer Documents
City Of Banja Luka Tender
Bosnia and Herzegovina
Description: Periodic Review of the Fire Alarm System
Closing DateNA
Tender AmountRefer Documents
6201-6210 of 6732 active Tenders