Fire Tenders

Fire Tenders

Landkreis Teltow Fl Ming Tender

Civil And Construction...+1Civil Works Others
Germany
Details: The property at Brandenburgische Strasse 100 in Ludwigsfelde has 2 building sections. The building is used as a 2-stream vocational school with preparation and classrooms, administration and office rooms, a serving kitchen with dining room, and storage rooms. The main building, which faces the street on its gable side, and the side wing angled at right angles to it, were built around 1950. The main building has a full basement and 2 floors above ground and an attic. The side wing has a partial basement and 1 floor above ground and an attic. The building sections were built as a masonry structure with steel stone and reinforced concrete ceilings, a wooden roof structure with concrete roof tiles. The roof structure consists of nailed lattice rafter trusses on the eaves sill and ridge purlin. The hipped areas were built as a purlin roof structure with rafters. The interior and sanitary facilities were renovated in the early 1990s. In this context, the roof covering (clay tiles) was also renewed. The current planning includes the renovation and the fire protection upgrade of the buildings. Outside, the roof structure and roof covering are being renewed. Windows and facades are being revised. Inside, fire protection renovation is being carried out with regard to the hallway partitions and necessary room closures. The main building is approx. 75.00 x 13.50 m and the side wing approx. 35.00 x 12.50 m. The services advertised below relate to the metalwork.
Closing Date20 Nov 2024
Tender AmountRefer Documents 

10 State fire and rescue guilt of the Head of the State Service of Ukraine from emergency situations in the Dnipropetrovskaya region Tender

Others...+1Electrical and Electronics
Ukraine
Purchaser Name: 10 State fire and rescue guilt of the Head of the State Service of Ukraine from emergency situations | Комплексна Система Відеонагляду ( Мережевий Реєстратор – 1 Шт., Жорсткий Диск – 1 Шт., Камери Відеонагляду – 12 Шт., Гігабітний Poe – 2 Шт., Джерело Безперебійного Живлення – 1 Шт., Монтажний Комплект )
Closing Soon7 Nov 2024
Tender AmountUAH 150 K (USD 3.6 K)

4 STATE FIRE AND RESCUE UNIT OF THE MAIN DEPARTMENT OF THE STATE SERVICE OF UKRAINE FOR EMERGENCY SITUATIONS IN ZAPORIZK Oblast Tender

Others
Ukraine
Purchaser Name: 4 STATE FIRE AND RESCUE UNIT OF THE MAIN DEPARTMENT OF THE STATE SERVICE OF UKRAINE FOR EMERGENCY SITUATIONS | Бруси Обрізні Різних Розмірів
Closing Soon8 Nov 2024
Tender AmountUAH 36.7 K (USD 892)

10 State fire and rescue guilt of the Head of the State Service of Ukraine from emergency situations in the Dnipropetrovskaya region Tender

Others
Ukraine
Purchaser Name: 10 State fire and rescue guilt of the Head of the State Service of Ukraine from emergency situations | Комплексна Система Відеонагляду
Closing Soon7 Nov 2024
Tender AmountUAH 150 K (USD 3.6 K)

DEPT OF THE ARMY USA Tender

Consultancy Services
United States
Details: Naics Code 334511 - Search, Detection, Navigation, Guidance, Aeronautical, And Nautical System And Instrument Manufacturing request For Information: This Is Not A Solicitation: This Request For Information (rfi) Will Be Utilized In Planning For The Assured Positioning, Navigation And Timing/space Cross-functional Team (apnt/s Cft), Contested Environment Event. This Rfi Does Not Constitute An Invitation For Bids (ifb), A Request For Proposal (rfp), Or A Request For Quote (rfq), Nor Does Its Issuance Obligate Or Restrict The Government To An Eventual Acquisition Approach. This Rfi Does Not Obligate The Government To Issue A Solicitation. This Rfi Is Being Conducted Solely For Information And Planning Purposes And Does Not Constitute A Solicitation. Neither Unsolicited Proposals Nor Any Other Kinds Of Offers Will Be Considered In Response To This Request Or Accepted By The Government To Form A Binding Contract. No Solicitation Document Exists, And A Formal Solicitation May Or May Not Be Issued By The Government As A Result Of The Responses To This Rfi. The Government Will Not Be Liable For Payment Of Any Response Preparation Expenses And Is Not Obligated By The Information Received. Any Costs Incurred By Interested Companies In Response To This Announcement Will Not Be Reimbursed. The Information Provided May Be Used By The Army In Developing Future Acquisition Strategies And Will Be Used To Identify Capable Sources To Participate In The Event. Interested Parties Are Responsible For Adequately Marking Proprietary Or Competition Sensitive Information Contained In Their Response. note: The Use Of Rfi Number Apntscft-24 Is For Tracking Purposes Only. background/description: In Accordance With Federal Acquisition Regulation (far) Part 10, The Apnt/s Cft Is Conducting Market Research To Identify Potential Sources Capable Of Providing Commercial Off-the-shelf (cots), Non-developmental Items (ndi), Or Near Ndi For Assured Pnt Technologies In The Ground, Air, Space Or Cyber Domains And Situational Awareness, Defensive, And Offensive Capabilities In The Navigation Warfare (navwar) Mission Area. More Specifically, This Rfi Is Being Issued For The Purpose Of Identifying Potential Sources Who Can Provide Ground, Air, Space Or Cyber-based Pnt And Navwar Sensor Capabilities Ready For Test And Demonstration At The Apnt/s Cft Event Or Deployment, Up To 180 Days. this Rfi Requests Respondents To Submit A White Paper That Addresses The Information Outlined Below. In Addition, Respondents Are Encouraged To Submit Corporate Overview Information And Basic Qualifications In Managing Hardware And Software Development Projects That Are Similar In Scope And Process To An Assured Pnt, Electronic Warfare (ew) Or Satellite Communications (satcom) Program. this Rfi Is Part Of A Series Of Industry Engagements In Support Of Enhancing The Industry-government Partnership, Which Is Critical To Providing An Effective And Scalable End-product For Apnt, Space-based Pnt Navwar And Other Capabilities. The Government Intends To Consider All Industry Inputs And Initiatives. The Army Plans To Leverage Industry Recommendations On The Delivery Of Assured Pnt, Non-space And Space-based Pnt And Navwar Hardware And Software To Implement Best Practices, Improve Productivity, Gain Programmatic And Operational Efficiencies, And Realize Cost Savings. the Government Will Not Be Responsible For Any Costs Incurred By Event Participants, To Include White Paper Submission Costs, Travel Costs, Technology Demonstrations, Exercises, Experiments, And Any And All Costs Associated With Event Participation. All Costs Incurred Throughout The Event Are The Responsibility Of The Participating Organization. department Of Defense (dod) Science Engineering And Technical Assistance (seta) Contractors And Federally Funded Research And Development Centers (ffrdcs) Supporting Dod Functions May Be Utilized To Review White Paper Submissions, Facilitate The Event And May Participate In Technical Or Operational Assessments. the Government Is Seeking The Following Information In White Paper Responses Provided: what Is The Technology Readiness Level (trl) And Manufacturing Readiness Level (mrl) Of The System Or Capability? If Not Trl 6 Can A Trl 6 Or Greater Be Achieved Within A Year Of Assessment? is The Capability Ready For Experimentation Or Demonstration? is The System A Prototype Or Productized Capability? can The System Or Capability Be Provided For Further Soldier/unit Assessment In A Devops (test-fix-test) Environment? on What Platforms Will The Capability Integrate – Mounted, Dismounted, Aerial, Fixed Site, On-orbit, Ride-share, Free Flyer, Etc.? what Army Warfighting Function Will The Capability Support – E.g. Aviation, Fires, Maneuver, Intelligence, Cyber, Sustainment, Mission Command is The System Or Capability A Non-space-based Solution? Can It Become A Non-space-based Pnt Solution? what Is The Minimum And Maximum Global Navigation Satellite System (gnss) Spectrum Range And Rate The System Or Capability Can Detect A Signal Of Interest? what Is The Field Of Regard Of The Sensor Or Antenna (area Covered For The Detector Of The System When Pointing To All Mechanically Possible Positions)? Can It Be Sectored? what Is The Instantaneous Field Of View Of The Sensor Or Antenna (area Covered For The Detector Of The System When Pointing To One Position)? over What External Interfaces Does The Capability Provide Data? Describe The Output File Formats, Bandwidth Requirements And Indicate Any That Are Not Among Recognized Standards. can The Capability Be Operated Remotely? If So What Is The Mechanism? Can You Describe The Interface In Detail Or Provide An Interface Control Document? what Are The Size, Weight And Power (swap) Characteristics Of The Capability? what Is The Required Clearance Volume Of The Antenna? How Is It Oriented With Respect To Potential Mounting Locations? what Global Positioning System (gps) Receiver Does Your System Use? If There Is A Built-in Gps Is It Selective Availability Anti-spoofing Module (saasm) Compliant? Can The System Interface To A Gps That Is Saasm Compliant? is The System Or Capability Military Code (m-code) Compatible? can The System Or Capability Be Ruggedized And Capable Of Extended Operation In Multiple Worldwide Outdoor Environments? What Military Standard (mil Std) Is The System Built To Or Tested To? provide Documentation Of Ansi 95.1 (2005) Compliant Stand-off Distance While Operating. will The System Or Capability Support Aerial And Ground-based Assured Pnt And/or Anti-jam (aj) Antenna Capabilities? will The System Or Capability Support Spectrum Monitoring, Detection And Tracking Of And/or Data Analytics For Signals Of Interest Within The Gnss Spectrum? If So, Identify Which Gnss Signals? describe Any Specialized Software That Is Required For System Operation. If Such Software Is Required, Provide Information On The Operating System Environment, Minimal Hardware Requirements And Architecture (processor Type, Performance, Etc.) Required To Run The Software. what Software Licensing Agreements Are Available For Government Purchase? what Is The Typical First Article Delivery Time And Typical Production Rate Of The System? what Detailed Technical Data Package For The System Or Capability Is Available To The Government, Either As Part Of A Unit Purchase Or Through A Separate Agreement, Including Cable Drawings? what Data Rights Are Available To The Government As Part Of A Purchase? what Integration Information (mechanical, Electrical) Is Immediately Available And Releasable To The Government? Is An Initial Capability Document (icd) Available Allowing The Government To Interface Directly With The Sensor Software Or To System Middleware? does The System Require A Specialized Skill Set Or Military Occupational Specialty (mos) To Operate And Maintain The System? does The System Support Victory And Open System Architecture (osa) Requirements? describe The Available Operator Training Curricula. describe Any Established Training For Maintenance. what Sustainment And Training Requirements Can The Contractor Support? what Platforms/systems Is The Capability Already Integrated Onto? for Geolocation Capabilities What Is The Expected Accuracy And Precision For Spectrum Monitoring? what Is The Expected Timeline For Delivery Of Spectrum Monitoring Information? Does It Support Tactical Timelines? are Projected Capabilities Compatible With Army Systems? what Cyber Security Standard Is Your System Or Capability Compliant With And Who Sanctioned It? what Cyber Security Software Analysis Tools Have Been Utilized To Examine The System Or Capability And What Are The Results Of Those Examinations? what Are The Training Requirements Needed For Unit Leaders And Staffs To Incorporate The System Properly Into Planning And Execution Of Operations? describe Embedded Built In Test (bit)/built In Test Equipment (bite) Capability Available With The System And To What Level It Reports Faults. what Critical Program Information Protections Are In Place? what Reliability, Availability, And Maintainability (ram) Performance Does Your System Meet, To Include Expected Mean Time Between Failure (mtbf)? what Warranty Coverage Is Available And Explain Any Extended Maintenance Support. describe The Transportation And Storage Requirements. has Your Company Performed This Type Of Effort Or Similar Type Effort (to Include Size And Complexity) In The Past? If So, Provide Contract Number, Point Of Contact (poc), E-mail Address, Phone Number, And A Brief Description Of Your Direct Support Of The Effort. what Radio Frequency (rf) Is Optimum To Have Your System Tested Against? companies Should Provide Data To Support Performance Claims Either By Analysis Or With Test Data. in Addition To The White Paper, All Interested Parties Are Encouraged To Submit Company And Product Literature, And/or Other Pertinent Information, Such As A Description With Performance Parameters And A Statement Of Current Availability, Summary Of Prior Testing, Test Reports, And An Estimated Cost Of Test Articles And Production Units, For The Government’s Consideration. Interested Parties Are Encouraged To Provide A Current Customer Base And Identify Systems In Which The Product Is Currently Being Employed. responding To This Rfi: Interested And Capable Sources Are Invited To Submit An Unclassified White Paper Describing Their System. Please Limit White Paper Submissions To A Maximum Of Fifteen (15) Pages (including A Cover Sheet) And Provide The Following Information: cover Sheet contact And Company Information name title company Name date Of Incorporation number Of Years In Business number Of Employees company Security Clearance Level location mailing Address phone Number website Address email Address note That Rfi Respondents Shall Designate A Single Point Of Contact For Receipt Of All Information Pursuant To This Rfi. please Identify Your Company's Small Business Size Standard Based On The Primary North American Industrial Classification System (naics) Code Of 334511- Search, Detection, Navigation, Guidance, Aeronautical, And Nautical System And Instrument Manufacturing. The Small Business Size Standard For This Naics Code Is 1,250 Employees. For More Information, Please Refer To Http://www.sba.gov/content/table-small-business-size-standards. Please Also Indicate Any Socioeconomic Classifications: large Business Concern; small Business (sb) Concern; 8(a); small Disadvantaged Business (sdb); women-owned Small Business; historically Underutilized Business Zone (hubzone); veteran-owned Small Business; service-disabled Veteran-owned Small Business name/type Of Technology Or Model technology Maturity: Existing Technology Or Technology Concept (reference Questions 1-45 Above) brief Overview Of Company History body Of White Paper: the Submittal Should Address The Requests For Information Above, And Any Additional Technical Or Company Information. A Description Of The System Supported By Technical Parameters Is Desired. the Government Requests That Interested Sources Submit An Electronic Response Of Not More Than Fifteen (15) Pages, 8.5" X 11" Paper, 12-point Times New Roman Font, With A Minimum Of One (1) Inch Margins All Around. Responses Should Include The Following Point Of Contact Information: • Company Name • Duns # • Cage Code • Address • Point Of Contact • Phone Number • Fax Number • Email Address supporting Documentation (such As Marketing Brochures, Fliers, Published Presentations Or Papers And Other Materials That Summarize The Technology And More About Your Company) Is Acceptable (up To 2 Pages Worth), And May Be Referenced By Reviewers Only In Support Of Claims Identified In The White Paper, And Only Where Specifically Referenced In The White Paper. The Government Makes No Guarantee That The Supporting Documentation Will Be Reviewed And/or Considered. any Company Proprietary Information, Performance Capabilities And/or Future Modification Plans Should Be Clearly Identified And Must Be Marked Accordingly And Will Be Protected By The Government. responses To The Rfi Will Not Be Returned. responses To The Rfi May Be Used To Develop Government Documentation. responses To The Rfi Will Be Used For Planning Purposes To Identify Interested Sources Capable Of Participating In The Event. respondents To The Rfi May Not Receive Feedback From The Government Once Reviewed. additional Information May Be Requested And / Or Provided By The Government To Capable Sources In Support Of The Event. proprietary Information Should Be Clearly Marked. No Classified Documents Will Be Included In Your Response. Please Be Advised All Information Submitted In Response To The Rfi Becomes The Property Of The U.s. Government And Will Not Be Returned. All Information Received In Response To This Rfi Marked "proprietary" Will Be Handled Accordingly. as Indicated Above, The Government Will Utilize Non-government Personnel To Review Responses To This Rfi, Plan, Coordinate And Execute The Event. The Respondent Must Clearly State On The Cover Sheet To The Rfi Response Whether Or Not A Proprietary Information Agreement (pia), Non-disclosure Agreement (nda), Or Equivalent Is Required Prior To Non-government Personnel Reviewing The Submissions. Should A Pia/nda Be Required, The Respondent Must Obtain The Pia/nda From The Company Pocs And Provide The Pia/nda With Their Rfi Submittal. To Obtain The Company Poc List, Please Send An Email Request To The Following: Ms. Lisa Reyes Lisa.t.reyes.ctr@army.mil all Interested Companies Or Organizations Are Encouraged To Respond To The Rfi By Providing Information By 3:00 Pm Est On 30 November 2023. respondents Are Requested To Submit An Electronic Copy Of The Responses To The Apnt/s Cft, Integration Division, Test And Experiment Lead, Mr Jason Wideman Jason.b.wideman.civ@army.mil And To The Project Lead, Ms. Lisa Reyes Lisa.t.reyes.ctr@army.mil include Rfi Number Apntscft-24 In The Subject Line. All Requests For Further Information Shall Be In Writing And Via Email; Telephonic Requests For Additional Information Will Not Be Accepted. your Interest In Participating In Our Event Is Appreciated.
Closing Date30 Nov 2024
Tender AmountRefer Documents 

1 State fire and rescue department of the main administration of the state service of Ukraine from emergency situations in the Kirovograd region Tender

Civil And Construction...+2Civil Works Others, Excavation
Ukraine
Purchaser Name: 1 State fire and rescue department of the main administration of the state service of Ukraine from emergency | Ліжко З Матрацом Код Дк 021:2015:39140000-5 Меблі Для Дому
Closing Soon11 Nov 2024
Tender AmountUAH 71 K (USD 1.7 K)

The Provincial Branch of the Association of Volunteer Fire Departments of the Republic of Poland of the Wielkopolska Province named after General Stanisław Taczak Tender

Transportation and Logistics
Poland
Purchaser Name: The Provincial Branch of the Association of Volunteer Fire Departments of the Republic of Poland of the | Poland – Vehicles For The Emergency Services – Zakup Quadów Z Przyczepą Transportową
Closing Soon12 Nov 2024
Tender AmountRefer Documents 

The Provincial Branch of the Association of Volunteer Fire Departments of the Republic of Poland of the Wielkopolska Province named after General Stanisław Taczak Tender

Poland
Purchaser Name: The Provincial Branch of the Association of Volunteer Fire Departments of the Republic of Poland of the | Poland – Vehicles For The Emergency Services – Zakup Quadów Z Przyczepą Transportową
Closing Soon12 Nov 2024
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+2Others, Building Construction
United States
Details: 2 department Of Veterans Affairs request For Qualifications (rfq) no. 36c77625q0008 dayton Va Medical Center redevelopment Opportunity dayton, Ohio 7 October 2024 date And Time Responses Due: February 7, 2025, At 3pm Est date And Time Questions Due: October 25, 2024 disclaimer the Information Presented In This Request For Qualifications And All Supplements, Revisions, Modifications, Updates, And Addenda Thereto (collectively, The Rfq ), Including (without Limitation) Narrative Descriptions And Information, Is Not Represented To Be All Of The Information That May Be Material To An Offeror S Decision To Submit A Response To This Rfq To Finance, Design, Develop, Renovate, Construct, Operate And Maintain The Project (as Defined Below) On A Portion Of The U.s. Department Of Veterans Affairs (va) Campus Named In Attachment A. neither Va, Nor Any Of Its Contractors, Subcontractors, Officers, Employees, Counsel, Advisors, Or Agents Make Any Representation Or Warranty, Whether Express, Implied, Or Created By Operation Of Law, As To The Accuracy Or Completeness Of This Rfq Or Any Of Its Contents Or Materials Referred To Or Provided Pursuant To Or In Connection With This Rfq, And No Legal Liability With Respect Thereto Is Assumed Or May Be Implied. Any Information Or Site Description Is Merely Provided To Assist Offerors In Their Independent Analysis Of The Decision To Submit A Response. The Transactions Contemplated By This Rfq Involve Significant Risks. Offerors And Their Advisors Should Review Carefully All The Information Set Forth In The Rfq And Any Additional Information Available To Them To Evaluate Such Risks. no Additional Representation Or Warranty, Whether Express, Implied, Or Created By Operation Of Law, Will Be Made By Va. No Person Has Been Authorized To Make Or Give On Behalf Of Va Any Other Written Or Oral Representation, Warranty Or Assurance With Respect To The Project Or The Accuracy Or Completeness Of The Information Provided In This Rfq Or Otherwise And, If Any Such Representation, Warranty, Or Assurance Is Made Or Given, It May Not Be Relied Upon By Any Offeror As Having Been Made By Or On Behalf Of Va, And Va Shall Not Have Any Liability For Or With Respect To Such Statements. table Of Contents 1 Executive Summary 1 1.1 Authority To Outlease 1 1.2 Rfq Terms And Condition Acceptance 2 2 Proposed Development Of Site 2 2.1 Overview Of Solicitation Structure 2 2.2 Location, Background And Description Of The Site 3 2.3 Development Considerations 3 2.3.1 National Historic Preservation Act 3 2.3.2 National Environmental Policy Act And Other Environmental Considerations 4 2.3.3 Infrastructure 4 2.3.4 Legal Considerations 4 2.3.5 Prevailing Wages 5 2.3.6 Handicap Accessibility 6 2.3.7 Eul Statutory Requirements 6 2.3.8 Hrp Statutory Requirements 6 2.3.9 Va S Goals And Objectives 6 2.3.10 Other Considerations 7 3 Lease Exhibits 7 4 Submital Requirements 8 4.1 Time And Date Of Submission 8 4.2 Manner Of Submission 8 4.3 Response Content 9 4.3.1 Cover Letter With Background And Administrative Information 10 4.3.2 Legal Requirements 11 4.3.3 Section 1: Development And Operations Concept 12 4.3.4 Section 2: Development Team Qualifications, Experience, And Past Performance 15 4.3.5 Section 3: Property Management (and, If Applicable, Supportive Services) Team Qualifications, Experience, And Past Performance 16 4.3.6 Section 4: Financial Wherewithal And Experience Securing Financing 17 5 Evaluation Criteria 18 5.1 Initial Review 18 5.2 Formal Presentations 18 5.3 Selection Process 18 5.4 Selection Timeline 18 5.5 Evaluation Factors 19 6 Miscellaneous Terms And Conditions Applicable To This Rfq 23 6.1 Authorizations By Submission Of Response 23 6.2 Teaming Arrangements And Special Purpose Entities 23 6.3 Hold Harmless 23 7 Ineligibility 23 8 Additional Information 24 attachment A: Site Information 25 attachment B: Supportive Housing Sample Lease Exhibit Outlines 32 attachment C: Non-supportive Housing Sample Lease Exhibit Outlines 33 department Of Veterans Affairs Rfq #36c77625q0008 26 request For Qualifications dayton Va Medical Center redevelopment Opportunity dayton, Ohio executive Summary the United States Department Of Veterans Affairs (va), Under Its Enhanced-use Leasing (eul) Authority (38 United States Code (u.s.c.) §⧠8161 To 8169) And The Historic Reuse Program (hrp) Authority Derived From Title 54 U.s.c. §⧠306121-306122 (formerly Section 111), Is Pleased To Issue This Request For Qualifications (rfq Or Solicitation), Seeking Competitive Responses From Qualified Organizations (offerors) To Serve As Developer(s) In Redeveloping Underutilized Vacant Buildings (described In Attachment A) On The Dayton Va Medical Center Campus In Dayton, Ohio. Redevelopment May Occur Under Va S Eul Authority To Benefit Veterans (directly Or Indirectly) And/or Create Permanent Supportive Housing For Homeless And/or At-risk Veterans And Their Families Or Under Va S Hrp Authority To Reuse And Preserve The Historic Property. authority To Outlease va Is Authorized To Outlease Land And Improvements To Non-federal Entities Through The Eul Program Or Hrp. Such Leases Can Have A Term Of Up To Ninety-nine (99) Years. va S Office Of Asset Enterprise Management (oaem) Administers The Eul Program. The Eul Authority Allows Va To Partner With The Public Or Private Sector To Maximize Returns To Veterans From Underutilized Capital Assets. It Allows Selected Developers To Finance, Design, Develop, Renovate, Construct, Operate And Maintain Supportive Housing And/or Commercial/other Use(s) That Benefit Veterans Directly And/or Indirectly. Va Envisions That Development Of The Eul Site Will Entail Well-planned And Coordinated Endeavor, Which Is Compatible With The Campuses Ongoing Mission-related Activities And The Surrounding Non-va Community. Va S Eul Authority Allows Va To Make Capital Contributions To Eul Projects Using Minor Construction Appropriations Funds. the Hrp Authority Allows Va To Manage, Outlease, Or Exchange Historic Facilities (available Land, Buildings, And Other Resources) In A Manner Consistent With Va S Obligation To Maintain Historic Assets. An Hrp Agreement Can Be Either A Long-term Outlease (up To 99 Years) Of Facilities Under Va S Jurisdiction Of Control To The Public Or Private Sector Or An Exchange Of Historic Properties. This Program Is Administered By The Office Of Real Property (orp) Within Va S Office Of Construction And Facilities Management (ocfm). Unlike Under Eul Authority, Va Is Not Authorized To Make Capital Contributions To Projects Under Its Hrp Authority. offeror(s) Under Both Va Authorities Will Be Authorized And Responsible For Financing, Designing, Developing, Renovating, Constructing, Operating, And Maintaining The Development Site In Accordance With Detailed Development Plan Approved By Va ( Development Plan ) And Applicable Federal, State, And Local Laws, Codes, Ordinances, And Regulations. rfq Terms And Condition Acceptance va Reserves The Right, At Any Time, Without Notice, At Its Sole And Absolute Discretion, To: (a) Reject Any Or All Responses; (b) Extend Any Deadline Set Forth In This Rfq; And (c) Terminate The Rfq Process, In Whole Or In Part. proposed Development Of Site for Offerors Proposing Under Va S Eul Authority, Public Law No. 117-168, The Sergeant First Class Heath Robinson Honoring Our Promise To Address Comprehensive Toxics Act Of 2022 (pact Act) Allows Va To Enter Into Euls That Provide Supportive Housing Or Enhance The Use Of The Leased Property By Directly Or Indirectly Benefitting Veterans. project Types May Include But Are Not Limited To: supportive Housing skilled Nursing Facilities assisted Living Facilities technical Job Training Centers research Facilities mixed-use, Etc. projects That Are Unlikely To Meet Statutory Requirements For Euls Include But Are Not Limited To: commercial Hotels warehouses, Etc. pursuant To 38 U.s.c. § 8162(b)(5), A Proposed Eul May Not Provide For Any Acquisition, Contract, Demonstration, Exchange, Grant, Incentive, Procurement, Sale, Other Transaction Authority, Service Agreement, Use Agreement, Lease, Or Lease-back By Va Or Any Other Federal Entity. Va May Only Receive Cash Consideration And No Forms Of In-kind Consideration Can Be Accepted In Lieu Of Cash Consideration. Va May Enter Into An Eul Without Receiving Consideration. for Offerors Proposing Under Hrp Authority, Va May Lease Or Exchange Its Historic Property So Long As The Lease Or Exchange Will Adequately Ensure The Preservation Of The Historic Property. overview Of Solicitation Structure through This Rfq, Va Is Presenting A Site Available For Redevelopment For An Offeror; Offerors May Submit A Single Response To This Rfq To Develop The Site Referenced In Attachment A. See Sections 4 And 5 Of This Rfq For Required Response Content And Evaluation Criteria. location, Background And Description Of The Site the Intent Of This Solicitation Is To Outline The Requirements For Selection Of A Developer(s) And Its Team(s) For Purposes Of Redeveloping Underutilized Vacant Buildings. It Is Expected That Any Redevelopment Would Also Enhance The Dayton Va Medical Center Campus. the Developer Entering Into An Eul Or Hrp Agreement With Va Will Be Responsible For All Financing, Designing, Developing, Renovating, Constructing, Operating, And Maintaining The Facility. pursuant To 38 U.s.c. §8163, Va Conducted A Public Hearing On The Eul Concept On September 26, 2022, At 6:00 Pm Est; Virtually With The Microsoft Teams Video Conference Application. attachment A Contains Additional Information Regarding The Location, Background Information, And Description Of The Subject Site. Development Considerations in Deciding Whether To Submit A Response To Develop The Proposed Site, The Offeror Should Consider Certain Factors. national Historic Preservation Act prior To Entering Into An Eul Or Hrp Agreement With Va, The Offeror Shall Work With Va To Fulfill The Requirements Of The National Historic Preservation Act, 54 U.s.c. §⧠300101, Et Seq. ( Nhpa ) In Conjunction With The Development And Finalization Of The Proposed Development Plans. Section 106 Of Nhpa, 54 U.s.c. §⧠306108, Requires The Consideration Of The Effects Of The Project On Historic Properties Listed Or Eligible For Listing In The National Register Of Historic Places (nrhp) And Provides Representatives Of The State And Local Governments, Tribes And Other Interested Consulting Parties Sufficient Opportunity To Comment On The Development Plan Prior To Execution Of The Eul Or Hrp Agreement. Section 106 Of The Nhpa Also Requires The Developer To Seek Ways To Avoid, Minimize, Or Mitigate Adverse Effects (e.g., Demolition) That The Development Plan Might Have On Any Historic Properties During The Execution Stage Of The Eul Or Hrp Agreement. Consummation Of This Effort Will Be Accomplished By Va. Va Will Act In Concert With The Offeror, When Necessary, In The Accomplishment Of Historical Compliance. For Guidelines Related To Historic Preservation Requirements, Visit Https://www.achp.gov/protecting-historic-properties. national Environmental Policy Act And Other Environmental Considerations the Eul Or Hrp Project Will Be Subject To All Applicable Federal, State, And Local Environmental Laws, Codes, Ordinances, And Regulations, Including But Not Limited To, The Comprehensive Environmental Response, Compensation, And Liability Act ( Cercla ), 42 U.s.c. §⧠9601-9675; The Resource Conservation And Recovery Act ( Rcra ), 42 U.s.c. §⧠6901, Et Seq; And The National Environmental Policy Act ( Nepa ), 42 U.s.c. §⧠4321-4347. Nepa Requires That Federal Agencies, Including Va, Identify And Evaluate The Potential Environmental Impacts Of A Major Federal Action (e.g., An Eul) On The Human Environment. Va Will Complete The Nepa Analysis Upon Va S Selection Of The Offeror. The Offeror Will Be Required To Provide Development-specific Information To Support The Analysis. The Nepa Analysis Must Be Completed By Va, Prior To Execution Of The Eul Or Hrp Agreement. The Offeror Will Be Responsible For Complying With Mitigation Requirements Of The Nepa Analysis, If Required. The Offeror Shall Comply With All Applicable Environmental Laws And Will Be Responsible For Any Required Cleanup/remediation Activities. Additionally, The Offeror Will Be Responsible For Any Necessary Environmental Studies, Reports, Site Assessments, Seismic, Etc. That Are Needed By Offeror To Meet Offeror S Obligations. Lastly, The Offeror Will Be Responsible For Complying With Any Regulatory Requirements For The Abatement And Removal Of Any Asbestos And/or Lead-containing Material. infrastructure any Available Information About Infrastructure Regarding The Site Is Included In Attachment A. It Is The Responsibility Of The Offeror To Pay Utility Providers For All Utilities Through Separate Metering. It Is The Responsibility Of The Offeror To Bring In The Necessary Utility Lines (water, Sewer, Gas, Electricity, Fiber Optics, Communication, Cable, Etc.) To Operate The Eul Or Hrp Site. Va Is Not Obligated To Provide Selected Offeror Access To Va Owned Utilities Or Resources. legal Considerations overview the Offeror Is Responsible For Conducting Its Own Due Diligence Regarding The Eul Or Hrp Site Including, Without Limitation, Whether (a) The Development Of The Eul Or Hrp Site, As Contemplated By The Response, Can Be Accomplished In Compliance With Applicable Federal, State, And Local Requirements (including Fire, Life Safety, Accessibility, Zoning, State And Local Building Codes, And Other Local Land Use Restrictions); (b) The Condition Of The Eul Or Hrp Site Is Suitable For The Offeror S Contemplated Use; (c) The Necessary Permits, Variances, Special Exceptions And Other Governmental Actions Or Approvals Required For The Contemplated Developments Can Be Reasonably Obtained (at No Cost Or Expense To Va); And (d) The Contemplated Use(s) Is Otherwise Practical And Economically Feasible. Property Is Under Concurrent Jurisdiction. Prior To The Execution Of The Lease Agreement, Offeror Will Need To Have Written Executed Agreements (e.g., Memorandum Of Understanding) Regarding Fire, Police, And Emergency Services In Place, Including Va Concurrence. taxes in Accordance With The Pertinent Provisions Of The Eul Statute (i.e., 38 U.s.c. § 8167), The Offeror During The Eul Term Will Be Subject To Any And All Applicable State And Local Taxes, Fees, Assessments, And Special Assessments Legally Chargeable To The Eul, The Offeror S Leasehold Interest, And The Offeror S Underlying Improvements. However, Neither Va S Interest In The Eul Nor The United States Fee Interest In The Underlying Properties Shall Be Subject, Directly Or Indirectly, To Any State Or Local Laws Relative To Taxation, Fees, Assessments Or Special Assessments. security offeror Is Responsible For Providing Security On The Site. The Offeror Shall Include In Their Response An Overview Of The Physical Security And Electronic Monitoring That Will Be Provided Based Upon The Individual Space Requirements And Tenant Mix Of The Proposed Eul Or Hrp Project. As Part Of The Response, It Should Be Noted That It Is The Requirement Of The Offeror To Provide Security 24/7 For The Site. energy Conservation And Sustainable Design Requirements the Va Sustainable Design Manual () Is The Guidance That Defines The Methodology To Incorporate Sustainable Design, Including Energy Efficiency, In The Eul Or Hrp Project. Va Encourages Offerors To Incorporate Sustainability Over And Above The Standards Found In The Current Va Sustainable Design Manual. In Previous Projects, Some Developers Have Proposed More Aggressive Energy Efficiency And Sustainability Milestones That Made Their Proposals, All Other Elements Considered Equal, More Attractive. To Take Advantage Of Existing Sustainability Work In The Private Sector That Is Well Accepted In The Construction Industry, Va Has Determined That Using A Third-party Rating System Is The Best Method For Fulfilling Va Sustainable Building Requirements In The Eul Or Hrp Project. The Offeror May Propose Using The Leadership In Energy And Environmental Design (leedâ®) Rating System, The Green Globesâ® Rating System, Or An Alternate Rating System. Va Requires That The Project Achieve At Least Leed Silver, Two Green Globes, Or An Equivalent Certification Level By The Alternate Rating Organization. Offerors Proposing To Use An Alternate Rating System Must Submit A Memo To The Va Project Manager Demonstrating That The Alternate Solution Achieves An Equivalent Level Of Certification As Leed Silver, Two Green Globes, Or Both. prevailing Wages unless The Offeror Can Demonstrate To The Satisfaction Of Va In The Form Of A Written Determination Or Written Correspondence From The U.s. Department Of Labor That The Offeror Or The Project Are Exempt Therefrom, Offeror Shall Comply With The Requirements Of The Davis-bacon Act, As Amended, 40 U.s.c. § 3141, Et Seq. And The Relevant Rules, Regulations, And Orders Of The Secretary Of Labor Applicable Thereto. handicap Accessibility the Offeror Will Be Required To Ensure That Its Design, Development, Construction, Operation, And Maintenance Plan And Activities On The Site Comply In All Respects With The Americans With Disabilities Act Of 1990, 42 U.s.c. §⧠12101, Et Seq., And The Architectural Barriers Act Of 1968, 42 U.s.c. §⧠4151, Et Seq., As Amended. eul Statutory Requirements va S Eul And Statutory Requirements Are Codified At 38 U.s.c. §⧠8161-8169 And As Amended. public Law No. 117-168, The Sergeant First Class Heath Robinson Honoring Our Promise To Address Comprehensive Toxics Act Of 2022 (pact Act). Sec. 705 Of The Pact Act, Modifications To Enhanced-use Lease Authority Of Department Of Veterans Affairs . hrp Statutory Requirements va S Hrp Is Authorized By The Nhpa, Specifically Title 54 Of The United States Code Section 306121-306122. This Authority Allows Federal Agencies Such As Va To Outlease Or Exchange Unneeded Historic Properties And Retain Proceeds To Fund Agency Preservation Activities. va S Goals And Objectives va Has The Following Goals And Objectives For The Project: reuse Underutilized Va Properties. This Could Take The Form Of Safe, Affordable, Smoke-free Housing For Veterans And Their Families Who Should Have Priority Placement In Any Housing Project Created On The Site. If Hud-vash Is Used, The Service Provider Must Provide Service Above And Beyond Those Provided By Hud And Va. It Is The Intent That Va Will Provide Case Management Services To Eligible Veterans. This Could Also Take The Form Of Another Use That Benefits Veterans Directly Or Indirectly, Including Commercial Use(s), And/or Reuses And Preserves Historic Property. Note: The Dayton Va Medical Center Will Not Accept Any Uses Of The Site That Are Industrial. (b) Avoid Ongoing Operating Costs Associated With The Upkeep Of Vacant And/or Underutilized Assets. (c) Provide An Innovative Solution Within Current Authority To Preserve A Va-owned, Historic Property. (d) Meet Va S Obligations Under Nhpa To Better Preserve And Protect The Property. other Considerations va Will Not Participate In Or Allow Its Or The United States Underlying Fee Interest In The Land To Be Used As Security For Financing For The Project Or Otherwise, Including Without Limitation, Providing Any Kind Of Guaranty Or Act In Any Way As A Beneficiary For A Financing Vehicle. in Regard To Any Proposed Project-related Financing To Be Obtained By The Offeror, Va As A General Rule Will Not Approve Any Financing That Includes Requirements That Operate To Deny, Restrict, Or Subordinate Va S Right To Terminate The Eul Or Hrp Agreement Upon The Offeror S Failure To Cure An Outstanding Event Of Default Thereunder. This Includes Any Document, To Include The Eul Or Hrp Agreement That Would Prevent Va From Terminating The Eul Or Hrp Agreement Due To Cross Default Arising From One Or More Parcels On The Property. Any Proposed Project Financing That Does Not Comply With This Restriction Must Be Explicitly Identified In The Rfq Response For Va S Unilateral Review And Evaluation. The Successful Offeror Must Establish And Maintain Positive Relations And Communications With State And Local Governmental Authorities And The Local Communities During Negotiations With Va And Any Of Its Representatives. the Successful Offeror Must Integrate Development Activities With Cultural Resources And Historical And Environmental Policy Management Requirements In Support Of Va S Mission And Operations. the Offeror Will Be Responsible For Coordinating The Work Schedule(s) With Va In Order To Minimize Disruption To The Campus Activities And Operations. This Coordination Includes The Work Of Any Contractor Or Subcontractor That The Offeror Retains In Connection With The Project. lease Exhibits following Its Selection, The Offeror Will Be Responsible For Preparing Detailed Lease Exhibits To Include A Development Plan, Operations And Maintenance Plan, And (if Housing Is Proposed) A Tenant Selection Plan For The Project. Attachment B Contains Sample Outlines For Supportive Housing Lease Exhibits. Attachment C Contains Sample Outlines For Non-supportive Housing Lease Exhibits. In Addition, The Offeror Will Need To Provide Other Lease Exhibits Such As A Site And Design Plans. Following Offeror Selection, Va Will Provide Detailed Lease Exhibit Templates. va Recognizes That Formulation Of The Lease Exhibits Will Require The Offeror To Work Closely And Cooperatively With Va. Va Will Provide Final Approval And Cooperate With The Offeror During The Drafting Process To Facilitate Preparation Of The Final Development Plan. It Is Anticipated That The Offeror Will Provide Va With Drafts Of The Lease Exhibits Throughout The Drafting Process. The Lease Exhibits Will Be Subject To Va S Review And Approval And May Be Subject To Review And Comment By Local Government And Other Stakeholders. submital Requirements time And Date Of Submission responses Must Be Received By February 7, 2025, At 3:00 Pm Est (the Closing Time ). Responses Received After The Closing Time Will Not Be Considered. questions Regarding This Rfq May Be Submitted In Writing By Emailing De Carol Smith At Decarol.smith@va.gov And Shahidat Abbas At Shahidat.abbas@va.gov By September 30, 2024. Questions Received After This Date May Not Be Considered. Responses Will Be Provided By An Amendment To The Rfq. All Government Communication Regarding This Rfq Shall Be From The Portfolio Managers, De Carol Smith And Shahidat Abbas. manner Of Submission responses Will Be Accepted By Electronic Means And Hard Copy. For Electronic Submission, Please Submit Responses Via Email To De Carol Smith At Decarol.smith@va.gov And Shahidat Abbas At Shahidat.abbas@va.gov. Please Note, Due To The Size Of Response Content, Offeror Will Need To Submit Rfq Response In Multiple Emails (20mb Capacity Per Email To Include Attachments) Labeled By Section Name And Subsection (see Rfq Section 4.3 For Additional Details). The Entire Response Must Be In Pdf Format. In Addition, Any Excel Or Other Spreadsheets That Allow Data To Be Manipulated Must Be Included In Their Native (i.e., Excel), Unprotected And Accessible Format. However, One Hard Copy Must Be Delivered By Mail, Courier, Or Hand Delivery To The Following Address: attention: C. Brett Simms designated Va Representative department Of Veterans Affairs office Of Asset Enterprise Management (044c) 810 Vermont Avenue, Nw washington, Dc 20420 each Hard Copy Of The Response Must Be Bound In A Three-ring Binder (to Allow Va To Easily Remove Parts For Copying And/or Circulation). responses Must Be In A Sealed Envelope Or Package With The Following Information Conspicuously And Legibly Written Or Typed On The Outside: offeror S Name; offeror S Complete Mailing Address; name And Contact Information For Offeror S Contact Person (e.g., Telephone, Email And Facsimile); And the Following Statement (to Be Completed Upon Delivery To Va): Response Received By Va As Of _____________(time) On _____________ (date) response Content each Response Must Contain The Following Sections Applicable To The Offeror S Proposed Project In The Following Order, With Each Section Clearly Labeled, Beginning On A New Page And Not Exceeding The Applicable Section Page Limit. section # section Name And Subsections (note: Separate Sections And Subsections With Tabs In Hard Copies) page Limit na cover Letter (including Background And Administrative Information) 5 Pages 1 development And Operations Concept team Composition And Structure development Concept alignment Of Development Concept With Va Goals And Objectives project Financing Plan project Timeline management Approach (development, Property Management, Subcontractors, And, If Applicable, Supportive Services) proposed Veteran Hiring And Community Relations Strategies For Project 25 Pages (includes Resumes) 2 development Team Qualifications, Experience, And Past Performance development Qualifications And Experience development Past Performance development Team Key Personnel Qualifications tab 2d: Veteran Hiring And Community Relations Experience 20 Pages 3 property Management (and, If Applicable, Supportive Services) Team Qualifications, Experience, And Past Performance tab 3a: Property Management (and, If Applicable, Supportive Services) Qualifications And Experience tab 3b: Property Management (and, If Applicable, Supportive Services) Past Performance tab 3c: Property Management (and, If Applicable, Supportive Services) Key Personnel Qualifications 20 Pages 4 financial Wherewithal And Experience Securing Financing tab 4a: Financial Wherewithal tab 4b: Experience Securing Financing 15 Pages (excludes Financial Statements) appendix A financial Statements And Auditor S Opinion Letter no Limit appendix B explanation Of Any Legal Issues (if Any) no Limit pages Submitted That Are In Excess Of Any Page Limit (including A Section Page Limit) Will, At Va S Sole Discretion, Be Discarded And Not Reviewed Or Evaluated By Va. Supporting Data, Such As Explanations Of Any Legal Issues, And Auditor S Opinion Letter, Will Not Count Against The Page Limits. Responses Must Be Typewritten In Arial 11-point Font Size Or Greater. For Purposes Of The Response, A Key Team Member Should Be Considered Any Member That Will Be Responsible For Approximately 20% Or More Of The Services Or Fees Under This Proposed Project. cover Letter With Background And Administrative Information a Cover Letter (on The Offeror S Letterhead) Must State That The Offeror Has Read And Agrees To Comply With All The Terms, Conditions, And Instructions Provided In This Rfq. Any Requests For Waivers Or Exceptions Must Be Clearly Identified In The Cover Letter And Shall Be Subject To Va S Review And Approval. the Cover Letter Must Also Contain The Following General Information About The Offeror And The Offeror S Team (if Applicable). (note: In The Case Of An Offeror That Is A Special Purpose Entity, Include Information On Each Partner, Member, Or Shareholder Of The Offeror.) administrative Information: Company/organization Name; Employer/tax Identification Number; Dunn And Bradstreet (duns) Number; Proof Of Vetbiz Verification (if A Service-disabled Veteran-owned Small Business Or Veteran-owned Small Business); Mailing Address; Main Telephone Number; And Main Facsimile Number. authorized Representative: Name And Contact Information (mailing Address; Telephone Number; E-mail Address; And Facsimile Number) Of The Representative Authorized To Act On Behalf Of The Offeror. day-to-day Point Of Contact: Name And Contact Information (mailing Address; Telephone Number; E-mail Address; And Facsimile Number) Of The Individual Designated By The Offeror As The Person To Whom Questions And/or Requests For Information Are To Be Directed. form Of Business: Description Of The Offeror S Form Of Business (whether A For-profit Corporation, A Nonprofit Or Charitable Institution, A Partnership, A Limited Liability Company, A Business Association Or A Joint Venture), State Of Incorporation, And A Brief History Of The Organization And Its Principals: articles Of Incorporation, Partnership, Joint Venture, Or Limited Liability Company Agreement (note: For Any Offeror Or Team Member, As Applicable, That Is A Sole Proprietorship, Provide Current Mailing Address And A Summary Of Current Business Activity); current Certificate Of Good Standing; by-laws; copy Of Corporate Resolutions, Certified By A Corporate Officer, Authorizing The Offeror S Submission Of, Or Team Member S Participation With The Offeror In The Submission Of, The Response And The Entity S Authority To Proceed With The Project (assuming An Rfq Award Is Made, And Va S Approval Is Obtained); And list Of Principals. legal Requirements state Whether The Offeror Or Any Offeror S Team Member, As Applicable, Has Ever Been Terminated For Default, Non-compliance, Or Non-performance On A Contract Or Lease, Or Debarred From Any Federal, State, Or Local Government Contracts And, If So, Provide The Date And A Detailed Description Of The Occurrence In An Appendix (note: This Additional Detail Does Not Count Against Page Limits); And list Each Instance Within The Past Ten (10) Years And Explain In Sufficient Detail In An Appendix As Necessary (detail Does Not Count Against Page Limits) In Which The Offeror, Or Any Offeror S Team Member, Or Any Principal, Partner, Director, Or Officer Of Such Entities Was: convicted Of Or Pleaded Guilty Or Nolo Contendre To A Crime (other Than A Traffic Offense); subject To An Order, Judgment, Or Decree (including As A Result Of A Settlement), Whether By A Court, An Administrative Agency, Or Other Governmental Body, Or An Arbitral Or Other Alternative Dispute Resolution Tribunal, In Any Civil Proceeding Or Action In Which Fraud, Gross Negligence, Willful Misconduct, Misrepresentation, Deceit, Dishonesty, Breach Of Any Fiduciary Duty, Embezzlement, Looting, Conflict Of Interest, Or Any Similar Misdeed Was Alleged (regardless Of Whether Any Wrongdoing Was Admitted Or Proven); subject To An Action Or Other Proceeding, Whether Before A Court, An Administrative Agency, Governmental Body, Or An Arbitral Or Other Alternative Dispute Resolution Tribunal, Which, If Decided In A Manner Adverse To The Offeror, Team Member, Principal, Partner, Director, Or Officer (as Applicable), Would Reasonably Be Expected To Adversely Affect The Ability Of The Offeror Or Team Member To Perform Its Obligations With Respect To The Project (including The Ability To Obtain Or Repay Financing); debarred, Suspended, Proposed For Debarment, Declared Ineligible Or Voluntarily Excluded From Covered Transactions By Any Federal, State, Or Local Department Or Agency; notified That It Is In Default Of Any Federal, State, Or Local Contract Or Grant If Yes, Provide The Reason For The Default And Whether The Default Was Cured; terminated For Cause Or Default On One Or More Public Transactions (federal, State, Or Local); And party To Litigation Or A Formal Alternative Dispute Resolution (adr) Process (e.g., Binding Arbitration) Involving A Claim In Excess Of $50,000. For Those Matters Involving A Claim Equal To Or In Excess Of $500,000, Describe In Detail The Litigation Or Adr Process section 1: Development And Operations Concept in This Section, The Offeror Should Include All Relevant Information Necessary To Allow Va To Assess The Offeror S Overall Development And Operations Concept. Specifically, This Section Must Include The Following: tab 1a: Team Composition And Structure provide Brief Descriptions Of Offeror Entity And The Offeror S Team Members (i.e., Organizational Purposes Or Missions, Services Provided, Etc.), Including Key Roles And Responsibilities. The Offeror Should Describe Past Experience Working With The Offeror S Team Members. Provide An Organizational Chart Showing The Relationship Between The Offeror And The Offeror S Team Members, As Appropriate, Along With Their Roles And Responsibilities. Explain The Offeror S Approach To Managing The Team, Including Prior Experience Engaging And Overseeing The Work Of Multiple Team Members And Subcontractors. tab 1b: Development Concept state Whether The Offeror S Development Concept Falls Under Va S Eul Or Hrp Authority (see Rfq Sections 1.1 And 2). Provide A Brief Description Of The Offeror Team S Understanding Of Va S Development Objectives (see Rfq Section 2.3.8), The Developer Concept (to Also Include Site Construction And Building Design), And The Developer S Assets And Infrastructure To Be Redeveloped Under Va S Eul Authority Into Supportive Housing Or Commercial/other Use(s) That Benefit Veterans Directly Or Indirectly Or Under Va S Hrp Authority To Reuse And Preserve The Historic Property (see Rfq Section 2). Identify Potential Risks And Challenges Associated With The Project And Related Mitigation Strategies. Describe The Offeror S Plan To Identify And Evaluate Potential Assets For Redevelopment And Undertaking All Necessary Investigation Activities To Produce Development Scenarios. List Any Required Studies To Be Performed. Provide A Timeline For Development Of These Scenarios And Plans, Including Any Required Studies. tab 1c: Alignment Of Development Concept With Va Goals And Objectives identify How Proposed Development Will Meet Va S Goals And Objectives As Outlined In Rfq Section 2.3.9. As Applicable, State What Direct Or Indirect Veteran Benefits The Project Will Provide And How Historic Assets Will Be Preserved. tab 1d: Project Financing Plan provide A Narrative That Describes The Offeror Team S Strategy To Obtain Financing For This Project, Including Contingency Plan(s) In The Event One Or More Sources Of Funding Are Not Available. The Narrative Should Also Explain Key Assumptions Reflected In The Following Required Budgets To Be Provided In A Working Microsoft Excel Document (excluded From Page Count): development Budget Sources And Uses: Development Budget Must Show Estimated: (a) Total Development Costs For The Project, Including Hard And Soft Costs; (b) Financing Costs, Including Types And Amounts Of Debt And Equity, And Underlying Amortization Periods; (c) Ownership Structure, Including Percentage Of Ownership By The Offeror (or In The Case Of A Special Purpose Entity, Each Team Member); And, (d) All Capital Funding Sources (e.g., Low Income Housing Tax Credit Equity, Equity Provided By The Lessee, Federal, State And Local Government Funding, Grant Proceeds, Loan Proceeds, Etc.) Used To Finance The Project. Note That Va Is Authorized To Provide Eul Projects With A Capital Contribution, But Va Is Not Authorized To Make Capital Contributions To Projects Under Its Hrp Authority. annual Operating Budget: List All Estimated Annual Revenues For The Project, Including Expected Monthly Rents By Unit Type And The Basis For /source Of Rent (e.g., Rental Vouchers). In Addition, List All Expected Annual Operating Expenses Associated With The Project. Provide A 30-year Cash Flow Projection In A Working Microsoft Excel Document (excluded From Page Count). annual Supportive Services Budget (if Applicable): List All Expected Annual Supportive Services Expenses For The Eul Or Hrp Site And Projected Sources Of Funding. tab 1e: Project Timeline the Offeror S Response Must Contain A Timetable For The Project Containing The Following Key Dates: project Financing Sources: Anticipated Application, Award, And Closing Dates For Each Project Phase (as Applicable). design Milestones: Completion Dates For Each Project Phase (as Applicable). eul Or Hrp Agreement Execution: Eul Or Hrp Agreement Execution Cannot Occur Until All Financing Commitments Have Been Obtained. For Eul Projects, The Eul Agreement Cannot Be Executed Until The Office Of Management And Budget Has Completed Its Review Of The Eul, And Congress Has Been Provided 45-day Notification Of Va S Intent To Execute The Eul; construction: Start And Completion Dates For Each Project Phase (as Applicable); And, occupancy: Date The Facility Is Open For Operation For Each Project Phase (as Applicable). tab 1f: Management Approach (development, Property Management, Subcontractors, And, If Applicable, Supportive Services) describe The Offeror Team S Approach To Operation, Management, Security, And Maintenance Of The Project In Accordance With Private Sector Standards. Provide A Staffing Plan (number Of Ftes And Type) For The Ongoing Operation Of The Project. The Response Shall Contain The Physical And Electronic Security Measures That Will Be Provided Based Upon The Individual Space Requirements And Tenant Mix Of The Proposed Eul Or Hrp Project. Include Proposed Approach For Management And Operations Within The Development Team, Property Management, Subcontractors, And Supportive Services (if Applicable). tab 1g: Proposed Veteran Hiring And Community Relations Strategies For Project describe The Offeror S Outreach Strategies To Maximize Participation Of Service-disabled Veteran-owned Small Businesses (sdvosbs), Veteran-owned Small Businesses (vosbs), Local Small Businesses, And Other Small Businesses, In All Aspects Of The Evaluation Of Assets And Subsequent Development Processes. Provide A Summary Of The Offeror Team S Plan To Increase Employment Opportunities (to Also Include Internships) For Veterans Associated With This Project. Explain The Offeror Team S Experience And Customized Approach To Managing Community Relations And Interacting With State And Local Government Officials (i.e., Zoning, Environmental, Shpo, Local Community, Stakeholders, Etc.). Describe Any Experience In Managing Relations With The Surrounding Community. section 2: Development Team Qualifications, Experience, And Past Performance in This Section, The Response Should Include All Relevant Information Necessary To Allow Va To Assess The Offeror Team S Relevant Experience And Operations Qualifications, Experience, And Past Performance. Specifically, This Section Must Include The Following: tab 2a: Development Team Qualifications And Experience list And Explain In Sufficient Detail The Offeror Team S Relevant Development Qualifications And Experience. Identify Any Past Experience Working With Va And Federal, State And Local Governments, If Any. tab 2b: Development Team Past Performance describe Three (3) Similar Relevant Development Efforts (past Or Current) Developed By The Offeror Or One Of Its Team Members That Are Comparable To The Subject Project To Be Developed. Each Project Described Should Have Been Completed Within The Past Ten (10) Years. For Each Project Listed, The Following Information Should Be Included: project Name location type Of Project / Use size Of Project (square Footage, Units, Number Of Buildings, Acreage, Etc.) amount, Type, And Sources Of Financing historic Buildings (if Any) description Of The Associated Infrastructure date Of Project Completion number Of Years Involved With The Development role Of The Offeror Team Member(s) contact Information For A Reference Who Va Can Contact Regarding Performance And Client Or Stakeholder (as Applicable) Satisfaction. Note: Including A Reference On This List Will Constitute Authorization For Va To Contact And Discuss The Offeror S Or Team Member S Performance. tab 2c: Development Team Key Personnel Qualifications identify The Key Personnel Who Will Lead The Developer S Community/neighborhood Planning Tasks, As Well As The Day-to-day Point Of Contact. For Each Key Personnel Named Provide A: description Of Their Proposed Role; discussion Of The Extent To Which Key Personnel Have Worked Together On Other Similar Projects; And, resume That Includes A Description Of The Person S Duties And Responsibilities, Education, Years Of Relevant Experience, Certifications/licenses, Skills, Expertise, Other Relevant Qualifications (note: Resumes Count Against Page Limits). tab 2d: Veteran Hiring And Community Relations Experience describe Any Experience Implementing Targeted Veteran Hiring Efforts And The Results Of Those Efforts. Explain The Offeror Team S Experience Managing Community Relations And Interacting With State And Local Government Officials (i.e., Zoning, Environmental, Shpo, Local Community, Stakeholders, Etc.). Describe Any Experience In Managing Relations With The Surrounding Community For Comparable Developments. section 3: Property Management (and, If Applicable, Supportive Services) Team Qualifications, Experience, And Past Performance in This Section, The Response Should Include All Relevant Information Necessary To Allow Va To Assess The Offeror Property Management Team S Supportive Housing Or Commercial/other Use(s) Development And Operations Qualifications, Experience, And Past Performance. Specifically, This Section Must Include The Following: tab 3a: Property Management (and, If Applicable, Supportive Services) Qualifications And Experience list And Explain In Sufficient Detail The Offeror Team S Relevant Supportive Housing Or Commercial/other Use(s) Property Management Qualifications And Experience. Identify Any Past Experience Working With Va, Federal, State And Local Governments, If Any. tab 3b: Property Management (and, If Applicable, Supportive Services) Past Performance describe Three (3) Similar Supportive Housing Or Commercial/other Use(s) Management Efforts (past Or Current) Developed By The Offeror Or One Of Its Team Members That Are Comparable To The Subject Project To Be Developed. Each Project Described Should Have Been Completed Within The Past Ten (10) Years. For Each Project Listed, The Following Information Should Be Included: project Name location type Of Project / Use(s) size Of Project (square Footage, Units, Number Of Buildings, Acreage, Etc.) amount, Type, And Sources Of Financing historic Buildings (if Any) description Of The Associated Infrastructure date Of Project Completion number Of Years Involved With The Development role Of The Offeror Team Member(s) contact Information For A Reference Who Va Can Contact Regarding Performance And Client Or Stakeholder (as Applicable) Satisfaction. Note: Including A Reference On This List Will Constitute Authorization For Va To Contact And Discuss The Offeror S Or Team Member S Performance also, Provide A Summary Of The Proposed Management And Operations Plans Specific To The Proposed Project Site And Use. Tab 3c: Property Management (and, If Applicable, Supportive Services) Key Personnel identify The Key Personnel Who Will Lead The Property Management (and, If Applicable, Supportive Services) Planning Tasks, As Well As The Day-to-day Point Of Contact. For Each Key Personnel Named Provide A: description Of Their Proposed Role; discussion Of The Extent To Which Key Personnel Have Worked Together On Other Similar Projects; And, resume That Includes A Description Of The Person S Duties And Responsibilities, Education, Years Of Relevant Experience, Certifications/licenses, Skills, Expertise, Other Relevant Qualifications (note: Resumes Count Against Page Limits). section 4: Financial Wherewithal And Experience Securing Financing in This Section, The Response Should Include All Relevant Information Necessary To Allow Va To Assess The Offeror Team S Financial Wherewithal And Ability To Secure Financing For Comparable Development Projects. Specifically, This Section Must Include The Following: tab 4a: Financial Wherewithal provide A General Overview Of The Offeror Team S Financial Stability And Evidence Of Their Financial Wherewithal To Develop Supportive Housing Communities And/or Other Relevant Use(s) With Associated Infrastructure, Roads, And Amenities. Please Attach Supporting Documentation To Include An Auditor S Opinion Letter(s) And The Offeror And Its Team Members Most Recent Audited Financial Statements. If Audited Financial Statements Are Not Available, Please Submit Unaudited Financial Statements. (note: Supportive Documentation And Financial Statements Do Not Count Against The Page Limits.) tab 4b: Experience Securing Financing summarize The Offeror Team S Experience Directly Securing Financing For Similar Projects To The Proposed Project In The Last 10 Years. Provide Brief Descriptions Of Three (3) Similar Efforts For Which The Offeror S Team Has Directly Secured Financing. For Each Example, Include Project Information, Including: project Name location description Of Project Type / Use(s) total Development Cost specific Funding Sources Secured, And role Of The Offeror Team Member. evaluation Criteria Initial Review following The Rfq Submission Deadline, Va Will Initially Review All Submissions For Completeness And Adherence To The Requirements And Conditions Set Out In This Rfq. Va Reserves The Right To Reject Submissions That Are Incomplete Or Fail To Adhere To The Requirements Set Forth In This Rfq. Formal Presentations complete And Acceptable Submissions Will Be Further Reviewed And Evaluated By Va, Ranked In Order, And A Competitive Range Established. Offerors Whose Submissions Are Found To Be Within The Competitive Range May Be Given The Opportunity, At Va S Sole Discretion, To Make A Formal Presentation To Va And Receive Questions Regarding Their Response. If A Presentation Is Required, Notice Will Be Provided To Those Offerors Asked To Make A Presentation And The Details Regarding That Presentation (i.e., Length Of Presentation, Etc.) Will Be Provided In The Notice. Selection Process the Government Intends To Review All Factors For Award In Making A Selection. Selection Will Be Based On An Integrated Assessment Of The Factors Set Forth In Section 5.5 Below. Selection Timeline va Anticipates Selection Of A Developer By December 2024. Evaluation Factors the Responses Will Be Evaluated Based On The Following Four Equally Weighted Factors. Where Factors Include Subfactors, Each Subfactor Will Also Be Equally Weighted. The Evaluation Factors Are As Follows: 5.5.1 Factor 1: Development And Operations Concept factor 1 Will Consist Of An Assessment Of The Offeror S Team Composition And Structure, Development Concept, Alignment Of Development Concept With Va S Goals And Objectives, Financing Plan, Timeline, Project Management Approach, And Veteran Hiring And Community Relations For This Project. Factor 1 Is Comprised Of The Following Seven (7) Equally Weighted Subfactors: subfactor 1a: Team Composition And Structure va Will Assess The Offeror Team S Composition To Assess Capabilities And Skillsets, Including Key Roles And Responsibilities. Va Will Also Assess The Extent To Which The Offeror S Team Has Worked Together Previously On Similar Projects. The Organizational Chart Will Be Reviewed To Understand The Relationships Between The Different Team Members And Establish Whether Clear Lines Of Accountability Are In Place. subfactor 1b: Development Concept va Will Review The Offeror Team S Understanding Of The Requirements And Developer Technical Approach (to Include Development Concept And Proposed Site Construction/building Design) To Assess How The Offeror Team Proposes To Effectively Accomplish The Project. The Response Should Identify Whether The Offeror Is Proposing Under Va S Eul Or Hrp Authority, Demonstrate The Offeror Team S Understanding Of The Complexity Of The Project, Potential Risks And Challenges, Proposed Mitigation Strategies, And The Importance Of Close Communication And Collaboration With Va Throughout The Process. Additionally, Va Will Assess The Viability Of The Proposed Timeline For Development Of These Scenarios And Plans, Including Any Required Studies. subfactor 1c: Alignment Of Development Concept With Va Goals And Objectives va Will Assess If Offeror(s) Development Plans Include A Clear Concept That Meets Va S Goals And Objectives As Outlined In Rfq Section 2.3.9, Including Whether Project Provides Direct And/or Indirect Benefits To Veterans And/or Provides For Preservation Of The Historic Property. subfactor 1d: Project Financing Plan a Realistic And Viable Financing Plan Should Be Provided For The Project. Va Will Review The Anticipated Sources And Uses For The Project For Development, Operations, And Provision Of Services (if Applicable), As Well As The Proposed Operating And Supportive Services (if Applicable) Budgets, To Assess The Offeror Team S Understanding Of The Project And Funding Availability, Including Contingency Plans. subfactor 1e: Project Timeline va Will Review The Proposed Project Timeline For Completeness And Inclusion Of All Required Milestones. The Offeror Team Should Provide A Realistic Project Development Timeline For Va S Review. subfactor 1f: Management Approach (development, Property Management, Subcontractors, And, If Applicable, Supportive Services) va Will Evaluate The Offeror Team S Approach To Development, Operation, Property Management, Security, And Maintenance Of The Project In Accordance With Private Sector Standards And Ensuring The Long-term Viability And Security Of The Project. The Property Management Plan Should Be Customized To The Proposed Product Type. Va Will Assess The Viability Of The Staffing Plan For The Proposed Operations Of The Project. The Subcontractor Management Approach Should Demonstrate The Offeror S Ability To Manage Multiple Entities Across Disparate Fields And Locations To Achieve A Common Goal. subfactor 1g: Proposed Veteran Hiring And Community Relations Strategies For Project va Will Assess The Offeror Team S Community Relations Strategy For The Project And The Extent Of The Offeror Team S Local Knowledge And Understanding. Va Will Also Assess The Extent To Which The Offeror Team S Prior Experience And Proposed Outreach Plan Will Maximize The Participation Of Sdvosbs, Vosbs, Local Small Business, And Other Small Businesses In All Aspects Of The Evaluation Of Assets And Subsequent Development Processes. It Is Also Important That The Offeror Team Provide A Clear And Realistic Plan To Hire Veterans (and Provide Internships For Veterans) In Association With This Project. 5.5.2 Factor 2: Development Team Qualifications, Experience, And Past Performance the Focus Of Factor 2 Is On The Offeror Team S Relevant Development Team Qualifications, Experience, And Past Performance. Factor 2 Is Comprised Of The Following Four (4) Equally Weighted Subfactors: subfactor 2a: Development Team Qualifications And Experience va Will Review The Extent To Which The Offeror S Team Has Demonstrated Expertise And Experience Developing Projects Similar To That Which The Offeror Is Proposing, Including Experience Working With Federal, State, And Local Government Entities. Va Will Also Evaluate The Offeror Team S Track Record Of Working With Qualified Property Management And Supportive Services Providers (as Applicable) And Their Associated Qualifications And Experience. subfactor 2b: Development Team Past Performance va Will Assess The Extent To Which The Offeror S Team Has A Proven Track Record Of Successfully Developing Relevant Projects To The Proposed Project. The Projects Identified Should Be Of Similar Size, And Scope To What Is Being Proposed For The Eul Or Hrp Site. The Information Provided For Each Of The Projects Will Be Reviewed For Completeness And Relevancy. subfactor 2c: Development Team Key Personnel Qualifications va Will Review The Qualifications Of The Proposed Key Personnel To Assess Their Ability To Successfully Complete The Developer S Responsibilities And Assist Va In Developing And Implementing The Most Viable Development Scenario. The Key Personnel Roles Should Be Clearly Identified, Along With Each Person S Relevant Experience, Skills, Expertise, And Education. subfactor 2d: Veteran Hiring And Community Relations Experience offeror Teams Will Be Evaluated On Their Experience And Success In Undertaking Veteran Hiring Efforts For Similar Projects. Va Also Intends To Evaluate The Offeror Team S Experience With Managing Community Relations. Offeror Teams Should Demonstrate Local Market Knowledge And Experience Working With The Stakeholder Community On Similar Projects To The Proposed Project. 5.5.3 Factor 3: Property Management (and, If Applicable, Supportive Services) Team Qualifications, Experience, And Past Performance the Focus Of Factor 3 Is On The Offeror Team S Relevant Property Management (and, If Applicable, Supportive Services) Team Qualifications, Experience, And Past Performance. Factor 3 Is Comprised Of The Following Three (3) Equally Weighted Subfactors: subfactor 3a: Property Management (and, If Applicable, Supportive Services) Qualifications And Experience va Will Review The Extent To Which The Offeror Team Has Demonstrated Expertise And Experience Managing And Operating Comparable Projects To The Proposed Project And Experience Working With Federal, State, And Local Government. Va Will Also Evaluate The Proposed Property Management And Supportive Services Provider S (if Applicable) Associated Qualifications And Experience. Va Will Also Consider The Adequacy Of Safety And Security Measures Implemented Successfully At Other Similar Projects. subfactor 3b: Property Management (and, If Applicable, Supportive Services) Past Performance va Will Assess The Extent To Which The Offeror Team Has A Proven Track Record Of Successfully Managing And Operating Comparable Projects To The Proposed Project. The Projects Identified Should Be Of Similar Size, Scope, And Complexity To The Proposed Project. The Information Provided For Each Of The Projects Will Be Reviewed For Completeness And Relevancy. subfactor 3c: Property Management (and, If Applicable, Supportive Services) Key Personnel va Will Review The Qualifications Of The Proposed Project Operations Key Personnel To Assess Their Ability To Successfully Manage The Project For The Duration Of The Lease Term. The Key Personnel Roles Should Be Clearly Identified, Along With Each Person S Relevant Experience, Skills, Expertise, And Education. 5.5.4 Factor 4: Financial Wherewithal And Experience Securing Financing factor 4 Consists Of An Evaluation Of The Offeror Team S Financial Wherewithal And Experience Securing Financing For Comparable Projects. Factor 4 Is Comprised Of Two (2) Equally Weighted Subfactors: subfactor 4a: Financial Wherewithal va Will Assess The Financial Wherewithal Of The Offeror S Team To Undertake Their Proposed Development. Va Will Evaluate Whether The Response Has Provided Sufficient Evidence And Documentation, As Required By The Rfq, To Demonstrate The Financial Wherewithal And Current Financial Capacity To Successfully Execute A Project Of This Size, Scope And Complexity. subfactor 4b: Experience Securing Financing va Will Review The Offeror Team S Experience Securing Financing Similar To Funding Needed For The Proposed Development On The Site. The Offeror S Team Should Demonstrate A Proven Track Record Of Directly Securing Traditional And Non-traditional Project Financing. miscellaneous Terms And Conditions Applicable To This Rfq authorizations By Submission Of Response any And All Information Provided By An Offeror And Its Team Members May Be Used By Va To Conduct Credit And Background Checks. teaming Arrangements And Special Purpose Entities multiple Offerors May Form A Joint Venture For The Purpose Of Submitting A Response To This Rfq. A Special Purpose Entity May Also Be Created For The Purpose Of Submitting A Response. Va May Require That Financial And Performance Guarantees Be Provided By These And Other Offerors As Well As Team Members. Potential Offerors Who Do Not Have Strong Experience Or Skills In All The Required Areas (e.g., Financial Structuring, Development, Property Management, Operations, Services Delivery, Etc.) May Consider Submitting Responses Jointly With Entities Whose Experience Can Complement Their Own. (note: Va Will Not Be Involved In Facilitating Partnering Or Teaming Arrangements.) hold Harmless by Participating In The Rfq Process, Each Offeror Agrees To Indemnify And Hold Harmless Va And The United States Government And Each Of Their Respective Officers, Employees, Contractors, And Advisors From And Against Any And All Real Estate And Other Brokerage Fees Or Commissions, Finder S Fees, And Other Forms Of Compensation Related In Any Way To Activities Undertaken By Any Person As A Result Of Such Person S Efforts Towards And/or Participation In This Rfq Process Or The Submission By Such Person Of A Response, And Liabilities, Losses, Costs, And Expenses (including Reasonable Attorney S Fees And Expenses) Incurred By Any Indemnified Party (including Va) As A Result Of, Or In Connection With, Any Claim Asserted Or Arising As A Result Of, Or In Connection With, This Rfq Process. ineligibility the Following Persons (including Entities) Are Ineligible To Be An Offeror Or A Team Member Of An Offeror Or Otherwise Participate In The Project (including As A Contractor, Subcontractor, Or Professional): (a) Any Person That Has Been Debarred Or Suspended From Doing Business With Va; (b) Neither Such Person Nor Any Of Its Partners, Members, Or Principal Stockholders Is Listed On Any Non-procurement Or Reciprocal Lists On The Most Current System For Award Management Published By The U.s. General Services Administration Atâ www.sam.gov, As Updated From Time To Time, Or Any Replacement Thereof; (c) Neither Such Person Nor Any Of Its Partners, Members, Or Principal Stockholders Is A Person Who Poses A Security Or Safety Risk As Determined By The Secretary Of State, Including But Not Limited To Any Person Who Either Represents A Country, Or Is A Member Of Or Provides Political, Financial Or Military Support To A Group, That Is Listed In The Most Current Patterns Of Global Terrorism Report, Issued By The Secretary Of State In Compliance With 22 U.s.c. § 2656f(a), Available From The Superintendent Of Documents, U.s. Government Printing Office, Washington, Dc 20402 And Also Available Atâ http://www.state.gov/global/terrorism/annual_reports.html; And (d) Neither Such Person Nor Any Of Its Partners, Members Or Principal Stockholders Is Subject To A Criminal Indictment Or Information For A Felony In Any Court In The United States. For Purposes Of This Solicitation, The Term Principal Stockholder Shall Mean Any Person Who Is A Beneficial Owner (as Defined For Purposes Of Rule 13d-3 Of The Securities And Exchange Act Of 1934, As Amended And Promulgated By The Securities And Exchange Commission) Of Ten Percent (10%) Or More Of The Outstanding Stock Or Other Equity Of The Offeror. additional Information all Of The Information Required To Be Provided In Each Response Pursuant To Section 8 Of This Rfq Is Important To Va S Analysis And Evaluation Of Each Response. Va May Utilize Outside Sources In Addition To All Of The Information Provided In A Response In Evaluating Each Offeror S Submission. neither Va Nor Any Of Its Contractors, Subcontractors, Officers, Employees, Counsel, Advisors, Or Agents, Make Any Representation Or Warranty, Whether Express, Implied, Or Created By Operation Of Law, As To The Accuracy Or Completeness Of This Rfq Or Any Of Its Contents Or Materials Referred To Therein, And No Legal Liability With Respect Thereto Is Assumed Or May Be Implied. va Reserves The Right To: (a) Make A Selection Under This Rfq As A Result Of Initial Offers Submitted; And (b) Reject Any Or All Offers At Any Time Prior To Award And Cancel This Solicitation. Therefore, All Initial Offers Should Comprehensively Address Each Of The Requirements Set Forth Herein And Contain The Offeror S Best Terms. by Submitting A Response, Each Offeror Accepts All The Terms And Conditions Set Forth In This Rfq, And Any Updates, Supplements, And Amendments Thereto. Any Conflict (whether Actual Or Perceived) Between Different Parts Of This Rfq, As Between An Offeror And Va, Shall Be Resolved At The Sole And Absolute Discretion Of Va. in No Event Shall Va Be Liable For Any Fees, Costs, Or Expenses Associated With Any Of The Offeror S (or Their Brokers, If Any) Activities (e.g., Preparation, Discussions, Clarifications, Submissions, Or Negotiations), Relating Directly Or Indirectly To This Solicitation. Accordingly, As A Condition Of Submitting Its Response, Each Offeror Hereby Agrees To Indemnify And Hold Va Harmless For Any And All Such Fees, Claims, Liabilities, And Costs Arising In Connection With This Rfq And Its Underlying Process. any Relationship Between Va And An Offeror Arising From The Solicitation Is Subject To The Specific Limitations, Terms, Conditions, And Representations Expressed In This Rfq. Any Substantive Questions Or Concerns To Include Conflicts, Apparent Conflicts, Or Any Other Substantive Matters Regarding This Rfq Which May Arise During Preparation Of An Offeror S Response Should Be Addressed, In Writing, To: Decarol.smith@va.gov And Shahidat.abbas@va.gov.
Closing Date7 Feb 2025
Tender AmountRefer Documents 

The State Forest Company Tender

Software and IT Solutions
Lithuania
Details: It is planned to acquire the Programming Services of Information Systems Used and Developed by Vmu (hereinafter - Purchase Object). Main Information Systems of the Customer, for which Programming Services are expected to be purchased: 3.1.1. "Miško Skaita" Information System of Forestry Works and Timber Accounting. "miško Skaita" works in the environment of the Windows Operating System and is supported by Client-Server Technology. Delphi Programming Technology is used. 3.1.2. Forest Fire Registration System. The system is implemented by Foxpro Technologies. 3.1.3. Nursery Data Management Computer Program "medelyndb". The program is implemented with Microsoft Access Technologies. 3.1.4. Accounting Is "db Accounting". Is Realized by Sap Advantage Database Server 12, C++, Clipper Technologies. The system is supported by the manufacturer, therefore only integrations with this system are expected from the side of other VMUs. 3.1.5. Nature Management Information System. It is implemented with Postgresql, Postgis and Qgis technologies.
Closing Date26 Sep 2028
Tender AmountRefer Documents 
5761-5770 of 5786 active Tenders