Fiber Tenders

Fiber Tenders

Municipality Of Irosin, Sorsogon Tender

Civil And Construction...+1Construction Material
Philippines
Details: Description Republic Of The Philippines Province Of Sorsogon Municipality Of Irosin Bids & Awards Committee Invitation To Bid For Supply & Delivery Of Hardware/materials For The Improvement Of Tongdol And Bacolod Water System, Mapaso Barangay Road And San Agustin Multi-purpose Covered Court 1. The Local Government Unit Of Irosin, Through The 20% Edf 2025 Intends To Apply The Sum Of One Million One Hundred Forty Seven Thousand Five Hundred Fifty Two Pesos (p 1,147,552.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Supply & Delivery Of Hardware/materials For The Improvement Of Tongdol And Bacolod Water System, Mapaso Barangay Road And San Agustin Multi-purpose Covered Court, Good-06-2025. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Name Of Contract : Supply & Delivery Of Hardware/materials For The Improvement Of Tongdol And Bacolod Water System, Mapaso Barangay Road And San Agustin Multi-puprose Covered Court Brief Description: 433 Bags Portland Cement/28 Cu.m. Washed Sand/12 Cu.m. Gravel (peasize)/ 63 Cu.m. Graded Gravel/ 23 Pack Sahara/30 Pcs.16mm Rsb/101 Pcs.12mm Rsb/36 Pcs.10mm Rsb/28 Kgs. #16 Tie Wire/ 3pcs.cut-off Blade, 14"diam./ 31 Pcs. 4" Cutting Disc/15 Pcs. 4" Grinding Disc/7 Pcs. Hacksaw, Sandflex Blade/1 Pc ¾” Marine Plywood/12 Pcs. 1/2" Marine Plywood/1810 Bd.ft. Coco-lumber/ 51 Kls. Asst. Cw Nail/4 Pcs. 2"diam G.i. Pipe, S-40/8 Pcs. Steel Matting, 6.0mm/3 Pcs. Cylindrical Hinges/55 Kgs. Welding Rod/1 Set Padlock/6 Pcs. 1-1/2"diam.g.i. Pipe, S-40/6 Pcs. 1-1/2"x 4.0mm Flat Bar/ 60 L.m. 4"diam.p.e. Pipe, Sdr 11/60 L.m. 3"diam.p.e. Pipe, Sdr 11/162 L.m. 2-1/2"diam.p.e. Pipe, Sdr 11/ 150 L.m. 1"diam.p.e. Pipe, Sdr 11/300 L.m. 1/2"diam.p.e. Pipe, Sdr 11/8 Pcs.1/2"diam.g.i. Elbow/ 4 Pcs. 6''x 1/2"diam.g.i. Nipple/4 Pcs. 1/2"diam.g.i. Coupling/4 Pcs. Faucet/4 Pcs. Teflon Tape/1 Pc. 3"x 2-1/2"diam.p.e. Coupling Red., Sdr 11/1 Pc. 3"diam.p.e. Adaptor, Sdr 11/ 2 Pcs. 3"diam.p.e.90 Deg. Elbow, Sdr 11/1 Pc. 3"diam.p.e. Wye, Sdr 11/3 Pcs. 1"diam.p.e. Coupling/1 Pc. 3"diam. Gate Valve/3 Pc. 1"diam. Gate Valve/1 Set Motor Pump W/ Accessories, 1.5hp/1 Set Stainless Water Tank, 4000 Lits. W/ Float Switch And Accessories/23 Gal. Epoxy Primer Paint/10 Gal. Lacquer Thinner/ 2 Bot. Lacquer Thinner/20 Set 7" Paint Roller W/ Pan/20 Set 4" Paint Roller W/ Pan/2 Pcs. 4"paint Roller/ 12 Pcs. 2"paint Brush/45 Pcs. 3''x 1/4''thk Angle Bar/20 Pcs. 2''x 1/4''thk Angle Bar/2 Pcs. Plain G.i. Sheet (ga.18)/ 30 Gal. Rubber Paint/2 Set Fiber Glass Board W/ Frame Approved Budget For The Contract : P 1,147,552.00 Contract Duration : 30 Calendar Days Delivery Period : 7 Calendar Days After The Issuance Of Notice To Proceed Source Of Fund : 20% Edf 2025 2. The Local Government Unit Of Irosin Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By Seven(7) Calendar Days. Bidders Should Have Completed For The Last Two(2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent(60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Local Government Unit Of Irosin And Inspect The Bidding Documents At The Address Given Below From 8:00 Am-5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 29, 2025 Until February 19, 2025 From The Given Address And Philgeps Website And Lgu-irosin Website And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (p 5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Presenting In Person The Official Receipt Of Bid Documents To The Bac Office. 6. The Local Government Unit Of Irosin Will Hold A Pre-bid Conference On February 6, 2025,2:00pm At The Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before February 19, 2025, 1:59 Pm At Bac Office, Municipal Compound, San Julian, Irosin, Sorsogon. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On February 19, 2025, 2:00 Pm At The Given Address Below At The Conference Room, Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 10. The Local Government Unit Of Irosin Reserves The Right To Accept Any And All Bids, Declare A Failure Of Bidding Or Not Award A Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations(irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11.for Further Information, Please Refer To: Benjamin M. Gabionza,ce Mun. Engineer/mdrrmo Municipal Compound, San Julian, Irosin, Sorsogon Url: Www.irosin.gov.ph 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps Website And Www.irosin.gov.ph Date Of Publication: January 29, 2025 _____________________ Noel D. Mercado Ii Bac Chairman Instruction To Bidders 1. Scope Of Bid The Procuring Entity, Local Government Unit Of Irosin Invites Bids For The Supply & Delivery Of Hardware/materials For The Improvement Tongdol And Bacolod Water System, Mapaso Barangay Road And San Agustin Multi-purpose Covered Court With Project Identification Number Good-06-2025. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website. The Procurement Project (referred To Herein As “project”) Is Composed Of 1 Lot Hardware/materials, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 20% Edf 2025 In The Amount Of One Million One Hundred Forty Seven Thousand Five Hundred Fifty Two Pesos (p 1,147,552.00) 2.2. The Source Of Funding Is: 20% Edf 2025 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. A.foreign Ownership Exceeding Those Allowed Under The Rules May Participate Pursuant To: Iii. When The Goods Sought To Be Procured Are Not Available From Local Suppliers; Or B. Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No. 9184, The Bidder Shall Have An Slcc That Is At Least One(1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must At Least Equivalent To: A. For The Procurement Of Non- Expandable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Twenty Percent (20%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.2 Subcontracting Is Not Allowed During The Bidding. 7.3 Subcontracting Is Not Allowed During The Contract Implementation Stage. 7.4 Subcontracting Of Any Portion Of The Project Does Not Relieve The Supplier Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference On February 6, 2025,2:00pm At The Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii( Checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicted In Itb Clause 5.3 Should Have Completed Within The Last Two(2) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostile Convention, Only The Translated Documents Shall Be Authenticated Through The Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii( Checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification From Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 3184. 12. Bid Prices 12.1 Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A.for Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw(ex-works,ex-factory,ex-warehouse,ex-showroom, Or Off The Shelf, As Applicable); Ii. The Cost Of All Custom Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other(incidental) Services, If Any, Listed In The Bds. 13. Bid And Payment Currencies 14.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Adopted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreigh Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: Philippine Pesos 14. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty(120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1 The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 14 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii(technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded As Follows: Option 1- One Project Having Several Items That Shall Be Awarded As One Contract. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Supply & Delivery Of Hardware/materials For The Improvement Of Tongdol And Bacolod Water System, Mapaso Barangay Road And San Agustin Multi-purpose Covered Court Brief Description: 433 Bags Portland Cement/28 Cu.m. Washed Sand/12 Cu.m. Gravel (peasize)/ 63 Cu.m. Graded Gravel/ 23 Pack Sahara/30 Pcs.16mm Rsb/101 Pcs.12mm Rsb/36 Pcs.10mm Rsb/28 Kgs. #16 Tie Wire/ 3pcs.cut-off Blade, 14"diam./ 31 Pcs. 4" Cutting Disc/15 Pcs. 4" Grinding Disc/7 Pcs. Hacksaw, Sandflex Blade/1 Pc ¾” Marine Plywood/12 Pcs. 1/2" Marine Plywood/1810 Bd.ft. Coco-lumber/ 51 Kls. Asst. Cw Nail/4 Pcs. 2"diam G.i. Pipe, S-40/8 Pcs. Steel Matting, 6.0mm/3 Pcs. Cylindrical Hinges/55 Kgs. Welding Rod/1 Set Padlock/6 Pcs. 1-1/2"diam.g.i. Pipe, S-40/6 Pcs. 1-1/2"x 4.0mm Flat Bar/ 60 L.m. 4"diam.p.e. Pipe, Sdr 11/60 L.m. 3"diam.p.e. Pipe, Sdr 11/162 L.m. 2-1/2"diam.p.e. Pipe, Sdr 11/ 150 L.m. 1"diam.p.e. Pipe, Sdr 11/300 L.m. 1/2"diam.p.e. Pipe, Sdr 11/8 Pcs.1/2"diam.g.i. Elbow/ 4 Pcs. 6''x 1/2"diam.g.i. Nipple/4 Pcs. 1/2"diam.g.i. Coupling/4 Pcs. Faucet/4 Pcs. Teflon Tape/1 Pc. 3"x 2-1/2"diam.p.e. Coupling Red., Sdr 11/1 Pc. 3"diam.p.e. Adaptor, Sdr 11/ 2 Pcs. 3"diam.p.e.90 Deg. Elbow, Sdr 11/1 Pc. 3"diam.p.e. Wye, Sdr 11/3 Pcs. 1"diam.p.e. Coupling/1 Pc. 3"diam. Gate Valve/3 Pc. 1"diam. Gate Valve/1 Set Motor Pump W/ Accessories, 1.5hp/1 Set Stainless Water Tank, 4000 Lits. W/ Float Switch And Accessories/23 Gal. Epoxy Primer Paint/10 Gal. Lacquer Thinner/ 2 Bot. Lacquer Thinner/20 Set 7" Paint Roller W/ Pan/20 Set 4" Paint Roller W/ Pan/2 Pcs. 4"paint Roller/ 12 Pcs. 2"paint Brush/45 Pcs. 3''x 1/4''thk Angle Bar/20 Pcs. 2''x 1/4''thk Angle Bar/2 Pcs. Plain G.i. Sheet (ga.18)/ 30 Gal. Rubber Paint/2 Set Fiber Glass Board W/ Frame B. Completed Within The Last Two(2) Years From The Date Of The Submission Of Bids 7.1 Not Applicable Since Sub-contracting Is Not Allowed. 12 The Price Of Goods Shall Be Quoted Ddp Lgu-irosin, Irosin, Sorsogon. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. [two Percent (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. [five Percent (5%) Of Abc] If Bid Security Is In Surety Bond. 19.3 Hardware/materials 433 Bags Portland Cement/28 Cu.m. Washed Sand/12 Cu.m. Gravel (peasize)/ 63 Cu.m. Graded Gravel/ 23 Pack Sahara/30 Pcs.16mm Rsb/101 Pcs.12mm Rsb/36 Pcs.10mm Rsb/28 Kgs. #16 Tie Wire/ 3pcs.cut-off Blade, 14"diam./ 31 Pcs. 4" Cutting Disc/15 Pcs. 4" Grinding Disc/7 Pcs. Hacksaw, Sandflex Blade/1 Pc ¾” Marine Plywood/12 Pcs. 1/2" Marine Plywood/1810 Bd.ft. Coco-lumber/ 51 Kls. Asst. Cw Nail/4 Pcs. 2"diam G.i. Pipe, S-40/8 Pcs. Steel Matting, 6.0mm/3 Pcs. Cylindrical Hinges/55 Kgs. Welding Rod/1 Set Padlock/6 Pcs. 1-1/2"diam.g.i. Pipe, S-40/6 Pcs. 1-1/2"x 4.0mm Flat Bar/ 60 L.m. 4"diam.p.e. Pipe, Sdr 11/60 L.m. 3"diam.p.e. Pipe, Sdr 11/162 L.m. 2-1/2"diam.p.e. Pipe, Sdr 11/ 150 L.m. 1"diam.p.e. Pipe, Sdr 11/300 L.m. 1/2"diam.p.e. Pipe, Sdr 11/8 Pcs.1/2"diam.g.i. Elbow/ 4 Pcs. 6''x 1/2"diam.g.i. Nipple/4 Pcs. 1/2"diam.g.i. Coupling/4 Pcs. Faucet/4 Pcs. Teflon Tape/1 Pc. 3"x 2-1/2"diam.p.e. Coupling Red., Sdr 11/1 Pc. 3"diam.p.e. Adaptor, Sdr 11/ 2 Pcs. 3"diam.p.e.90 Deg. Elbow, Sdr 11/1 Pc. 3"diam.p.e. Wye, Sdr 11/3 Pcs. 1"diam.p.e. Coupling/1 Pc. 3"diam. Gate Valve/3 Pc. 1"diam. Gate Valve/1 Set Motor Pump W/ Accessories, 1.5hp/1 Set Stainless Water Tank, 4000 Lits. W/ Float Switch And Accessories/23 Gal. Epoxy Primer Paint/10 Gal. Lacquer Thinner/ 2 Bot. Lacquer Thinner/20 Set 7" Paint Roller W/ Pan/20 Set 4" Paint Roller W/ Pan/2 Pcs. 4"paint Roller/ 12 Pcs. 2"paint Brush/45 Pcs. 3''x 1/4''thk Angle Bar/20 Pcs. 2''x 1/4''thk Angle Bar/2 Pcs. Plain G.i. Sheet (ga.18)/ 30 Gal. Rubber Paint/2 Set Fiber Glass Board W/ Frame 20.2 Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It: Bir Registration 21.2 Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It: None General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract(scc). 2. Advance Payment 2.1 Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2 The Procuring Entity Is Allowed To Determine The Terms Of The Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 4. Inspection And Tests The Procuring Entity Or Its Representatives Shall Have The Right To Inspect And/or The Test The Goods To Confirm Their Conformity To The Project. In Addition To Tests In The Scc, Section Vii(technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identify Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 7.1. In Order To Assure The Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 7.2. The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Special Conditions Of Contract Gcc Clause 1 Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: [for Goods Supplied From Within The Philippines] “the Delivery Terms Applicable To This Contract Are Delivered [indicate Place Of Destination]. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is Wilson G. Baliwas. Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: A. Performance Or Supervision Of On-site Assembly And/or Start-up Of The Supplied Goods; B. Furnishing Of Tools Required For Assembly And/or Maintenance Of The Supplied Goods; C. Furnishing Of A Detailed Operations And Maintenance Manual For Each Appropriate Unit Of The Supplied Goods; D. Performance Or Supervision Or Maintenance And/or Repair Of The Supplied Goods, For A Period Of Time Agreed By The Parties, Provided That This Service Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And E. Training Of The Procuring Entity’s Personnel, At The Supplier’s Plant And/or On-site, In Assembly, Start-up, Operation, Maintenance, And/or Repair Of The Supplied Goods. F. No Additional Incidental Service Requirements. The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Spare Parts – The Supplier Is Required To Provide All Of The Following Materials, Notifications, And Information Pertaining To Spare Parts Manufactured Or Distributed By The Supplier: 1. Such Spare Parts As The Procuring Entity May Elect To Purchase From The Supplier, Provided That This Election Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And 2. In The Event Of Termination Of Production Of The Spare Parts: I. Advance Notification To The Procuring Entity Of The Pending Termination, In Sufficient Time To Permit The Procuring Entity To Procure Needed Requirements; And Ii. Following Such Termination, Furnishing At No Cost To The Procuring Entity, The Blueprints, Drawings, And Specifications Of The Spare Parts, If Requested. The Spare Parts And Other Components Required Are Listed In Section Vi (schedule Of Requirements) And The Costs Thereof Are Included In The Contract Price. The Supplier Shall Carry Sufficient Inventories To Assure Ex-stock Supply Of Consumable Spare Parts Or Components For The Goods For A Period Of Ninety (90) Calendar Days. Spare Parts Or Components Shall Be Supplied As Promptly As Possible, But In Any Case, Within Ninety (90) Calendar Days Of Placing The Order. Packaging – The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. The Packaging, Marking, And Documentation Within And Outside The Packages Shall Comply Strictly With Such Special Requirements As Shall Be Expressly Provided For In The Contract, Including Additional Requirements, If Any, Specified Below, And In Any Subsequent Instructions Ordered By The Procuring Entity. The Outer Packaging Must Be Clearly Marked On At Least Four (4) Sides As Follows: Name Of The Procuring Entity Name Of The Supplier Contract Description Final Destination Gross Weight Any Special Lifting Instructions Any Special Handling Instructions Any Relevant Hazchem Classifications A Packaging List Identifying The Contents And Quantities Of The Package Is To Be Placed On An Accessible Point Of The Outer Packaging If Practical. If Not Practical The Packaging List Is To Be Placed Inside The Outer Packaging But Outside The Secondary Packaging. Transportation – Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip, Or Ddp, Transport Of The Goods To The Port Of Destination Or Such Other Named Place Of Destination In The Philippines, As Shall Be Specified In This Contract, Shall Be Arranged And Paid For By The Supplier, And The Cost Thereof Shall Be Included In The Contract Price. Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Goods Are To Be Transported On Carriers Of Philippine Registry. In The Event That No Carrier Of Philippine Registry Is Available, Goods May Be Shipped By A Carrier Which Is Not Of Philippine Registry Provided That The Supplier Obtains And Presents To The Procuring Entity Certification To This Effect From The Nearest Philippine Consulate To The Port Of Dispatch. In The Event That Carriers Of Philippine Registry Are Available But Their Schedule Delays The Supplier In Its Performance Of This Contract The Period From When The Goods Were First Ready For Shipment And The Actual Date Of Shipment The Period Of Delay Will Be Considered Force Majeure. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Intellectual Property Rights – The Supplier Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 2.2 Partial Payment Is Not Applicable. 4 The Inspections And Tests That Will Be Conducted Are: Inspection Of The Hardware/materials If It Follows The Technical Specification Set By The End-user Unit. Section Vi. Schedule Of Requirements The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Total Delivered, Weeks/months Remarks Indicate Here Any Other Appropriate Information As May Be Necessary. Signature Over Printed Name Position Department/division Section Vii. Technical Specifications Item Specification Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] Technical Specifications Technical Specifications Item / Service Maximum Quantity Technical Specifications / Scope Of Work Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution.] Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; (b) Registration From Sec, Department Of Trade And Industry(dti) For Sole Proprietorship And Cda For Cooperatives (c) Valid Mayor’s Permit By The City Or Municipality Where The Principal Place Of Business Is Located (d) Tax Clearance Per Eo 398 (e) Tax Clearance For Collection Purposes Technical Documents ⬜ (f) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ (d) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And ⬜ (e) Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And ⬜ (f) Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (g) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. (h) Audited Financial Statement(afs) Audited Financial Statement Stamped, Received By The Bir Or Its Duly Accredited And Authorized Institutions, For The Immediately Preceding Calendar Year, Showing The Total Assets And Liabilities Which Should Not Be Earlier Than Two(2) Years From The Date Of Bid Submission Class “b” Documents ⬜ (i) If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (j) Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (k) Original Of Duly Signed And Accomplished Price Schedule(s). Other Documentary Requirements Under Ra No. 9184 (as Applicable) ⬜ (l) [for Foreign Bidders Claiming By Reason Of Their Country’s Extension Of Reciprocal Rights To Filipinos] Certification From The Relevant Government Office Of Their Country Stating That Filipinos Are Allowed To Participate In Government Procurement Activities For The Same Item Or Product. ⬜ (m) Certification From The Dti If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity.   Omnibus Sworn Statement(revised) Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g. Duly Notarized Secretary’s Certificate, Board/partnership Resolution Or Special Power Of Attorney, Whichever Is Applicable]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For And In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay, Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Of Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling(estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 Series Of 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This ___________ Day Of __________________, 2025 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me A Notary Public For And Within The Province/city Pf __________________, On This ________ Day Of _______________, 2025 At __________________________ By The Above Named Affiant With His/her __________________ As The Competent Evidence Of His/her Identity And Avows Under Penalty Of Law That All The Statements Contained On This Instrument Are True And Correct. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Republic Of The Philipppines ) City Of Sorsogon ) S.s. X ---------------------------------------------------x Bid Securing Declaration Project Identification No. ______ To: [insert Name And Address Of Procuring Entity] I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two(2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen(15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1(f) Of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid-securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am Declared Ineligible Or Post Disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And (c) I Am/we Declared As The Bidder With The Lowest Calculated And Responsive Bid And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I Have Hereunto Set My Hand This _____ Day Of ________, 2025 At __________________. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me A Notary Public For And Within The Province/city Pf __________________, On This ________ Day Of _______________, 2025 At __________________________ By The Above Named Affiant With His/her __________________ As The Competent Evidence Of His/her Identity And Avows Under Penalty Of Law That All The Statements Contained On This Instrument Are True And Correct. Doc. No. __________ Page No. __________ Book No. __________ Series Of 2025. Bid Form For The Procurement Of Goods (shall Be Submitted With The Bid) Bid Form Date: _____________________________ Project Identification No.: _____________ To: [name And Address Of Procuring Entity] Having Examined The Philippine Bidding Documents(pbds) Including The Supplemental Or Bid Bulletin Numbers_____, The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Offer To (supply/deliver/perform) (description Of The Goods) In Conformity With The Said Pbds For The Sum Of (total Bid Amount In Words And Figures) Or The Total Calculated Bid Price, As Evaluated And Corrected For Computational Errors , And Other Bid Modifications In Accordance With The Price Schedules Attached Herewith And Made Part Of This Bid. The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To (specify The Applicable Taxes, E.g. (i) Value Added Tax, (ii) Income Tax, (iii) Local Taxes, And (iv) Other Fiscal Levies And Duties), Which Are Itemized Herein Or In The Price Schedules. If Our Bid Is Accepted, We Undertake: A.to Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements Of The Philippine Bidding Documents(pbds); B. To Provide A Performance Security In The Form, Amounts, And Within The Times Prescribed In The Pbds; C. To Abide By The Bid Validity Specified In The Pbds And It Shall Remain Binding Upon Us At Any Time Before The Expiration Of That Period. Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And Your Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Bid You May Receive. We Certify/conform That We Comply With The Eligibility Requirements Pursuant To The Pbds. The Undersigned Is Authorized To Submit The Bid On Behalf Of (name Of The Bidder) As Evidenced By The Attached (state The Written Authority). We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including, The Attached Schedule Of Prices, Shall Be A Ground For The Rejection Of Our Bid. Name: Legal Capacity: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Contract Agreement For The Procurement Of Goods(revised) __________________________________________________________________________ This Agreement, Made The _________ Day Of _______________, ________ Between [name And Address Of Procuring Entity] Of The Philippines (hereinafter Called The“entity”) Of The One Part And [name Of Supplier] (hereinafter Called The “supplier”) Of The Other Part. Whereas, The Entity Invited Bids For Certain Goods And Ancillary Services, Particularly (brief Description Of Goods And Services) And Has Accepted A Bid By The Supplier For The Supply Of Those Goods And Services In The Sum Of (contract Price In Words And Figures In Specified Currency) (hereinafter Called The “contract Price”). Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents As Required By The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 Shall Be Deemed To Form And Be Read And Construed As Part Of This Agreement, Viz.: I. Philippine Bidding Documents(pbds) I. Schedule Of Requirements; Ii.technical Specifications; Iii.bill Of Quantities Iv.general And Special Conditions Of Contract; V.supplemental Or Bid Bulletins, If Any Ii. Winning Bidder’s Bid, Including The Eligibility Requirements, Technical And Financial Proposals, And All Other Documents Or Statements Submitted; Bid Form, Including All The Documents/statements Submitted; Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes, And All Other Documents Submitted(e.g., Bidder’s Response To Request For Clarifications On The Bid), Including Corrections To The Bid, If Any, Resulting From The Procuring Entity’s Bid Evaluation; C. Performance Security D. Notice Of Award Of Contract And The Bidder’s Conforme Thereto; And E. Other Contract Documents That May Be Required By Existing Laws And/or The Procuring Entity Concerned In The Pbds. Winning Bidder Agrees That Additional Contract Documents Or Information Prescribed By The Gppb That Are Subsequently Required For Submission After The Contract Execution, Such As The Notice To Proceed, Variation Orders And Warranty Security, Shall Likewise Form Part Of The Contract. 3. In Consideration For The Sum Of [total Contract Price In Words And Figures) Or Such Other Sums As May Be Ascertained, [name Of Bidder] Agrees To Execute The [state The Object Of The Contract] In Accordance With His/her/its Bid. 4. The [name Of The Procuring Entity] To Pay The Above-mentioned Sum In Accordance With The Terms Of Bidding. In Witness, Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Binding Signature Of The Procuring Entity: Binding Signature Of Supplier: Insert Name And Signature] [insert Name And Signature] [insert Signatory’s Legal Capacity] [insert Signatory’s Legal Capacity] Signed In The Presence Of: ______________________ ________________ Liaison Officer For: For: [insert Procuring Entity] [insert Name Of Supplier] Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Contract Agreement And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. This Instrument Consists Of ____ Pages Including This Page On Which The Acknowledgement Is Written Duly Signed By The Contracting Parties And Their Witnesses. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Bill Of Quantities Item No. Item Quantity Unit Unit Price Total Price Prepared By: ______________ Proprietor
Closing Date19 Feb 2025
Tender AmountPHP 1.1 Million (USD 19.8 K)

DEPT OF THE NAVY USA Tender

Machinery and Tools
United States
Details: Contact Information|4|n761.12|p1e|609-217-1825|eric.m.tarkett.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement|8|||x|mil-i-45208 Or Its Equivalent Or Higher||||| inspection And Acceptance Of Supplies|26|x||||||||||||x|||||||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo) Type|n/a|tbd|n00383|tbd|tbd|see Schedule.|qm4ezdv15jl8||tbd||||||| monetary Limitation Repair Purchase Orders|1|$40,000.00 Each| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|12 Months|60 Days After Discovery Of Defect ||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| contract Definitization (oct 2010)|9|||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|336413|1,250||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2|do-a1a || this Item Requires Government Source Approval Prior To Award. If You Are Not Anapproved Source, You Must Submit, Together With Your Proposal, The Information Detailed In The Navsup Source Approval Request (sar) Brochure Which Can Be Obtained On The Internet At: Https://www.navsup.navy.mil/navsup/ourteam/navsupwss/business_opps/offers Received Which Fail To Provide All Of The Data Required By The Sar Brochure Will Not Be Considered For Award Under This Solicitation. Please Note, If Evaluation Of A Source Approval Request Submitted Hereunder Cannot Be Processedin Time And/or Approval Requirements Preclude The Ability To Obtain Subject Items In Time To Meet Government Requirements, Award Of Requirement May Be Continued Based On Fleet support Needs. 1. Scope 1.1 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;harris Corporation; Drawing Number ( ;91417; ) ;3144520-301; , Revision ;latest; And All Details And Specifications Referenced Therein. 1.2 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.3 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c. 2. Applicable Documents - Not Applicable 3. Requirements 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: processor,target Lo ;3144520-301; P/n, ;1680-01-586-6374; Nsn, ;hard Copy dts An/ayk-29(v1) Performance Spec. For F/a-18e/f, Document Number pma265-90988-1, Rev A, 09 Dec 2011 And Boeing Spec. P.s. 17131 Interconnect, fiber Optic, Aircraft; Fabrication Of, Revision K, 22 June 2006; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. processor,target Lo ;harris Corporation; Company Name , ;dba Harris Govt Comm Systems 2400 Palm Bay Rd Ne palm Bay, Fl 32905-3399; Address , ;91417; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable
Closing Date13 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Machinery and Tools
United States
Details: Contact Information|4|n761.12|p1e|609-217-1825|eric.m.tarkett.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement|8|||x|mil-i-45208 Or Its Equivalent Or Higher||||| inspection And Acceptance Of Supplies|26|x||||||||||||x|||||||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo) Type|n/a|tbd|n00383|tbd|tbd|see Schedule.|qm4ezdv15jl8|||tbd|||||| monetary Limitation Repair Purchase Orders|1|$40,000.00 Each| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|12 Months|60 Days After Discovery Of Defect ||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| contract Definitization (oct 2010)|9|||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|336413|1,250||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2|do-a1a || this Item Requires Government Source Approval Prior To Award. If You Are Not Anapproved Source, You Must Submit, Together With Your Proposal, The Information Detailed In The Navsup Source Approval Request (sar) Brochure Which Can Be Obtained On The Internet At: Https://www.navsup.navy.mil/navsup/ourteam/navsupwss/business_opps/offers Received Which Fail To Provide All Of The Data Required By The Sar Brochure Will Not Be Considered For Award Under This Solicitation. Please Note, If Evaluation Of A Source Approval Request Submitted Hereunder Cannot Be Processedin Time And/or Approval Requirements Preclude The Ability To Obtain Subject Items In Time To Meet Government Requirements, Award Of Requirement May Be Continued Based On Fleet support Needs. 1. Scope 1.1 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;harris Corporation; Drawing Number ( ;91417; ) ;3144520-301; , Revision ;latest; And All Details And Specifications Referenced Therein. 1.2 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.3 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c. 2. Applicable Documents - Not Applicable 3. Requirements 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: processor,target Lo ;3144520-301; P/n, ;1680-01-586-6374; Nsn, ;hard Copy dts An/ayk-29(v1) Performance Spec. For F/a-18e/f, Document Number pma265-90988-1, Rev A, 09 Dec 2011 And Boeing Spec. P.s. 17131 Interconnect, fiber Optic, Aircraft; Fabrication Of, Revision K, 22 June 2006; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. processor,target Lo ;harris Corporation; Company Name , ;dba Harris Govt Comm Systems 2400 Palm Bay Rd Ne palm Bay, Fl 32905-3399; Address , ;91417; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable
Closing Date13 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Machinery and Tools
United States
Details: Contact Information|4|n761.12|p1e|609-217-1825|eric.m.tarkett.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement|8|||x|mil-i-45208 Or Its Equivalent Or Higher||||| inspection And Acceptance Of Supplies|26|x||||||||||||x|||||||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo) Type|n/a|tbd|n00383|tbd|tbd|see Schedule|qm4ezdv15jl8|||tbd|||||| monetary Limitation Repair Purchase Orders|1|$40,000.00 Each| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|12 Months|60 Days After Discovery Of Defect ||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| contract Definitization (oct 2010)|9|||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|336413|1,250||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2|do-a1a || this Item Requires Government Source Approval Prior To Award. If You Are Not Anapproved Source, You Must Submit, Together With Your Proposal, The Information Detailed In The Navsup Source Approval Request (sar) Brochure Which Can Be Obtained On The Internet At: Https://www.navsup.navy.mil/navsup/ourteam/navsupwss/business_opps/offers Received Which Fail To Provide All Of The Data Required By The Sar Brochure Will Not Be Considered For Award Under This Solicitation. Please Note, if Evaluation Of A Source Approval Request Submitted Hereunder Cannot Be Processedin Time And/or Approval Requirements Preclude The Ability To Obtain Subject Items In Time To Meet Government Requirements, Award Of Requirement May Be Continued Based On Fleet support Needs. 1. Scope 1.1 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;harris Corporation; Drawing Number ( ;91417; ) ;3144520-301; , Revision ;latest; And All Details And Specifications Referenced Therein. 1.2 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.3 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c. 2. Applicable Documents - Not Applicable 3. Requirements 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: processor,target Lo ;3144520-301; P/n, ;1680-01-586-6374; Nsn, ;hard Copy dts An/ayk-29(v1) Performance Spec. For F/a-18e/f, Document Number pma265-90988-1, Rev A, 09 Dec 2011 And Boeing Spec. P.s. 17131 Interconnect, fiber Optic, Aircraft; Fabrication Of, Revision K, 22 June 2006; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. processor,target Lo ;harris Corporation; Company Name , ;dba Harris Govt Comm Systems 2400 Palm Bay Rd Ne palm Bay, Fl 32905-3399; Address , ;91417; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. 4. Quality Assurance Provisions - Not Applicable. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable
Closing Date13 Jan 2025
Tender AmountRefer Documents 

DEPARTMENT OF EDUCATION SCHOOLS DIVISION OF EASTERN SAMAR Tender

Education And Training Services
Philippines
Details: Description Procurement Of Inclusive Learning Resource Centers Assistive Devices, Equipment, Supplies And Materials (lot 3- Support Service Area: Physical Therapy Area) 1. The Deped Schools Division Of Eastern Samar, Through The General Appropriation Act Of 2024 Intends To Apply The Sum Of ₱ 359,916.00 Being The Abc To Payments Under The Contract For Procurement Of Inclusive Learning Resource Centers Assistive Devices, Equipment, Supplies And Materials (lot 3- Support Service Area: Physical Therapy Area) Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Deped Schools Division Of Eastern Samar Now Invites Bids For The Above Procurement Project. Bidders Should Have Completed, Within 5 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. 4. Prospective Bidders May Obtain Further Information From Deped Schools Division Office Of Eastern Samar And Inspect The Bidding Documents At The Address Given Below During Monday-friday, 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Php 500.00. It May Also Be Downloaded From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Nonrefundable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Deped Schools Division Of Eastern Samar Will Hold A Pre-bid Conference On January 13, 2025, 10:00am At The Bac Office, Deped Schools Division Of Eastern Samar Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before January 27, 2025, 9:00am Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 27, 2025, 10:00am At The Given Address Below Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. Only The Proprietor Or Authorized Representative May Be Allowed To Purchase Bidding Documents. Letter Of Intent (loi), Special Power Of Attorney (spa) (for Authorized Representative), And Drl (document Request List From Philgeps) Are Required Upon Purchase. 11. The Deped Schools Division Of Eastern Samar Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Items, Specifications, Quantity Of Delivery, And Abc: Cabinet, 4' X 6' Double Door (3/4 Plyboard, Varnish Paint) Set 1 Wooden Cubicle Partition, 4 Panel Divider (l 70.25 Inches X H70.25 Inches X T0.75 Inches) Set 4 Mirror, Aluminum Frame (thickness 1/4 Inch X 4 X 8 Ft) Set 1 Filing Cabinet, Vertical Filing Cabinet In 2, 3 And 4 Drawers With Plastic Divider And Central Lock Heavy Duty Construction Assembles In Minutes Power Coated Finish Anti-tilt Mechanism Quiet Closing 3 Sectional Railings For Smooth Actions Central Locking System Unit 1 Learners'/clients' Chart Materials, High Quality Abs Body, Moulded Light Blue, Pink, Grey Color, Size: 340×230mm Unit 10 Anatomical Models, Brand New, High Quality, 1/2 Life Size Can Be Disassembled Into 27 Parts Hand Numbered With Key Guide Anatomically Accurate A Perfect Tool For Teaching/studying Human Muscular And Organs Anatomy Set 1 Blood Pressure, Product Details Type: Upper-arm Monitor Type: Digital Cuff Size: 32cm Dimension (w X H X D): 145 X 466 X 145mm Weight: 250g Technical Details Power Supply: Battery Battery Type: Li-polymer Features Smart App Availability: Yes Automatic Shut Off: No Low Battery Indicator: No Connection Bluetooth: No Wi-fi: No Unit 2 Stethoscope, Product Name: Dual Tube Stethoscope Weight: 185g Length: 80cm Product Material: Polymer Diaphram Listener Material: High-density Stainless Steel Product Composition: Eartip, Ear Hooks, Leaf Spring, Hose Heads, Diaphrams Unit 2 Tape Measure, Material: Pvc It Has Centimeter Scale On Reverse Side Which Is Up To 300cm Large, Easy To Read Marking Measures Up To 120 Inches Piece 2 Hand Dynamometer, Type: Electronic Counting Gripper Function: Comprehensive Fitness Exercise Material: Abs Size: 15cm/5.90"x10.5cm/4.13"x2cm/0.79" Piece 2 Ice Massage Caps, Size: 2 Count (pack Of 1) Measuring 2.9” In Diameter, The Ice Cup Massager Holder Also Fits Comfortably In The Hand. Material: Polyethylene Pack 3 Foam Rolls, Material: Expanded Polypropylene Foam Item Weight: 0.42 Pounds Size: 18 Inches Piece 4 Balance Board, Type: Rocker Board Dimensions: 32.28 X 11.81 X 0.59 Inches Weight Capacity: 100 Kg Material: Beech Wood Anti-skid Feature: Not Specified Unit 2 Treatment Table, Product Name: Multi Functions Physical Electric Therapy Treatment Table Size: L2040*w560*h550-820mm Product Feature 1. Electric Operation,3 Sections, New Design Epoxy Metal Frame. 2. Equipped With 3 Motors For Height, Back And Leg Rest Adjustment. 3. Height Adjustments For The Arm Rests. 4. With Artificial Leather Cover On The Head, Seat, Leg Areas. 5. 4 Luxurious Castors With Brake. Function: Suitable For Hospital Electric Therapy Treatment Table Use. Unit 1 Mat Table, Wood Construction Adds Strength And An Attractive Natural Finish. Supports Up To 500 Lbs For Better Patient Accommodation. Heavyweight Vinyl Upholstery Is Comfortable And Strong. Thick Foam Padding Provides Patient Comfort For A Better Experience. Five-leg Design With Center Support Ensures Stability Through Heavy Treatment. Height: 18" Weight Capacity: 500 Lbs Size: 4 Ft Wide X 7 Ft Long Unit 1 Adjustable Height Exercise Steps, Color: Teal/purple Brand: Us Weight Item Weight: 80 Ounces Item Dimensions Lxwxh: 30 X 15 X 8 Inches About This Item Made In The United States From Durable, Recyclable High-density Polyethylene Circuit-size (28. 5" L X 14. 5" W X 4" H) Aerobic Platform, 4 Original Risers, And Streaming Videos Platform Features Grooved, Nonslip Top And Supports Up To 275 Lbs Four Nonskid Feet On Each Riser And Platform Prevents Sliding Or Scratching Floors Vary Workout Difficulty By Adjusting Platform Height From 4" To 6" To 8" Using Risers Unit 1 Pediatric Examination Gowns, Opening: Full Open Back Style: Child Size Color: Jellybean Print Made With High Quality, 100% Cotton Comfortable, Durable, Washable, And Reusable Hook And Loop Closures At Neck And Mid-back Piece 5 Towels, Material: High Quality 100% Cotton Terry – 500gm2. Size: 90 X 180cm. Piece 10 Bed Sheets, Waterproof 5.5 Mil Vinyl Contoured Corners, Fitted 36" X 80" X 6" Case Of 12 Pack 5 Pillows, Pillow Shape: Rectangle Pillow Weight: 0.95-1000 Grams Pillow Height: 12.7cm Pillow Width: 40.64cm Pillow Length: 66.04cm Pillow Size: 40 X 66 Cm Pillow Material: 100% Cotton Pillow Filing: Cotton Poly-fiber Piece 4 Pillowcase, 2pcs Pillowcase Size: 1 X 28 Inches Material: Cotton & Polyester Set 10 Blankets, 100% Canadian Cotton, Soft Texture, High Quality Fabric Size: 52 X 90 Inch Piece 10 Step Stools, Double Steel Caravan Step. Rubber Non- Slip Steps. Leg Distance Front To Back 65 Cm. Width 42 Cm. Top Step Height 38 Cm. Bottom Step 20 Cm. Unit 2 Therapist Stools On Wheels, Description: This Stool Can Be Adjusted To Just About Any Position You Want, Making It Incredibly Versatile And Comfortable. It Has A 360-degree Swivel So You Can Quickly Spin Around To Access Anything You Need At Home Or In The Office. The Unique Saddle Seat Has Thick Padding, Making It Easy For You To Stay In The Same Place For Hours At A Time. Unit 2 Wedge Bolsters, Use A Wedge Bolster Along With Our Quicklock Face Rest Platform To Create A Quick And Easy Backrest For Any Portable Or Stationary Massage Table. Dimensions: 24"w X 10"h X 24"l With A Flat Top And A 36" Incline. Piece 1 Round Bolsters, 6" Round Bolster Bolsters Are Made With Earth Friendly Materials Of Cfc Free Foam And Pvc Free Upholstery Choices. High Quality Foam Offers Comfortable Support And Allows Clients To Fully Relax, And Come With Pull Handles At Both Ends For Therapist Convenience. Unlimited Versatility Makes This Comfortable And Supportive Cushion Your Building Block For Positioning. Measures 6" D X 26" L. Made Of Aero-cel Foam: Won't Flatten Or Get Lumpy Like Dacron Bolsters Incredibly Supple Conforms To Fit Curves Firm Gentle Support Piece 1 Core Peak Bolsters, Core Peak Bolster Peaked Shape Fits Comfortably Under Your Knees Precision-cut Foam 10" X 24", With 7" Peak Available In Blue, Gray, Or Black Piece 1 Mobilization Belts And Devices Features: Long Enough To Meet Your Needs: The Strap Belt For Mobilization Measures About 8.2 Feet Long, Enough To Meet Your Using Needs On Leg And Shoulder Stretch, Dancing Training, Yoga, Hop And Waist Support, Arm Movement And So On. Adjustable And Portable: The Yoga Belt With Buckle Comes With An Adjustable Buckle, Allowing You To Adjust The Length Of The Belt To Get A Desired Length, And You Can Easily Carry And Store The Belt, Without Taking Up Too Much Space. Specifications: Main Material: Nylon Color: Blue Size: Approx. 8.2 Feet In Length, About 2 Inches In Width Piece 5 Gait Belt Features: This Transfer Belt Is Designed With A Buckle, Which Can Be Adjusted According To Your Needs Without Worrying About Being Too Loose Or Too Tight. This Gait Belt Metal Buckle Has Reliable Materials, Smooth Surface And Lightweight Structure, Which Is Convenient For Long-term Use And Storage. Specifications: Material: Vinyl Color: Black Size: 60 X 2 Inches Piece 5 Kinesiology Tape, Ultra-strong And Sticky-hypoallergenic Adhesive Water Resistant 97% Cotton, 3% Nylon 180% Stretch For Full Range Of Motion Latex And Zinc Free Sticks 2-7 Days 5-10 Applications Per Roll Each Is 2"x 16.4" (5cmx5cm) Piece 5 Splinting Materials, Rescue Padded Board Splint 6 Paddes Wood Splint (different Sizes) Sizes: 35", 25" And 15" Velcro Straps Color: Blue Set 2 Paraffin Bath, Bath Arm, Hand And Foot Usage: Wax Fomentation Condition: New Voltage: 220v Ac Power:2 Kw Tank Size: 50cm X 35cm X 25cm Deep Unit 1 Dumbells Sets, Product Name: Dumbbell Set Dimension: 810 × 525 × 765mm (excluding Dumbbells) Weight: 37kg Sandbags Qty: 18 Pcs With Different Weight Sandbags Weight: 1lb, 2lbs, 3lbs, 4lbs, 5lbs Type: Medical Rehabilitation Equipment Function: Used For Whole Body Rehabilitation Training Total 18 Dumbbells 1 Lb / Piece, 2 Pieces 2 Lbs / Piece, 4 Pieces 3 Lbs / Piece, 4 Pieces 4 Lbs / Piece, 4 Pieces 5 Lbs / Piece, 4 Pieces Set 1 Theraband, Brand: Theraband Material: Rubber Color: Blue/black Sport Type: Exercise And Fitness/pilates Heavy Set Includes The Fifth And Sixth Of Eight Levels Of Latex Resistance Tubes, Blue, 100%, 5.8 Lbs., 200%, 8.6 Lbs., Black, 100%, 7.3 Lbs., 200%, 10.2 Lbs. Set 4 Goniometers, Protractro Goniometer With 360 Degrees Coverage To Measure Joint And Compare The Changes In Joint Angles Material: Clear Plastic 3 Gonimeter: 12 Inch, 8 Inch And 6 Inch Set 2 Reflex Nuero Hammer, Features: The Pointed Babinski-style Tip At The Base Of The Handle Elicits Superficial Or Cutaneous Responses, Including Plantar And Abdominal Reflexes. Multi-function Double-headed Percussion Hammer For Tapping On Various Parts Of The Patient To Check Nerve Response. Ergonomic Handle Design Make The Percussion Hammers Light And Easier To Use. Weight Balanced Hammer, With Two Soft Rubber Heads, A Large And A Small Hammerhead For Accurate Knocking. Zinc Alloy Comfortable Handle Grip Control, Hammer For High Elastic Pvc Rubber Material: Zinc Alloy + Pvc Color: Black Package Size: 27*11*3.5cm/10.6*4.3*1.3 Inch Package Weight: 140g/4.9oz Piece 2 Thermometer, 1 Second Measuring Time 3 Color Backlight Fever Reminder Auto Shut Off At 18 Seconds Store 50 Sets Of Data Body Temperature Measurement: 34.0-42.9°c / 93.2-109.2°f Surface Temperature Measurement: 0-100°c / 32-212°f Material: Abs Plastic Display Resolution: 0.1°c(0.1°f) Measuring Distance: 1~5cm (0.4~2in) Accuracy: (+/-)0.2°c Auto-shutdown Time: About 18s Power Supply: 2 * 1.5v Aaa Batteries (not Included) 1 Year Warranty Unit 1 Multiple Mode Electrical Stimulator Specification: Dimension: 170 X 60 X 26 (mm) Channel: Two Independent Channels Power Supply: 9v Battery X 1 Pcs Output: 0~100ma P To P Into 500ω Load Density(intensity): Change Of 15 Steps Pulse Amplitude Timer: 30 Minutes Countdown Timer With Auto Off Wave For Dual Phases Square Wave Display: Lcd Display With Timer/mode/density (“density”=intensity) Mode: 10 Programs, P1~p5 Tens, P6~p0 Fitness Ems Ramp Up: 3 Seconds Buzzer: 2 Different Reminders 1.correct: Single Beep 2.caution: Long Beep Pulse Wave Form Low Frequency Stimulator Low Frequency Stimulator Standard Accessories: Electrical Stimulator 1 Stimulator Lead Wire 2 Self Adhering Electrode 4 Operating Manual 1 9v Battery 1 Reusable Package Box 1 Unit 2 Abc = 359,916.00
Closing Date28 Jan 2025
Tender AmountPHP 359.9 K (USD 6.1 K)

City Of Bais Tender

Civil And Construction...+2Civil Works Others, Construction Material
Philippines
Details: Description Republic Of The Philippines City Of Bais -o0o- Bids And Awards Committee Invitation To Apply For Eligibility And To Bid The City Government Of Bais Invites Interested Bidders To Apply For Eligibility And To Bid For Various Improvement Of Operation Center, City Disaster Risk Reduction Management Office, Viz: Item Approved Budget For The Contract (abc) Pr No. 717-24 Php 1,065,020.00 1 15 Lgth Angle 40mm X 40mm X 5mm Thk X 6.0m Lgth 2 15 Lgth Angle 50mm X 50mm X 5mm Thk X 6.0m Lgth 3 20 Lgth Pipe, Gi, Nps 50mm Ø (2" Ø) X 6.0m Lgth S40 4 8 Lgth Steel Plate, Galvanize, 4' X 8' Gauge 14 5 50 Pcs Stainless Steel Bolt Nut Flat And Lock Washer Set, M10 X 70mm 6 50 Pcs Stainless Steel Bolt Nut Flat And Lock Washer Set, M6 X 60mm 7 50 Pcs Stainless Steel Bolt Nut Flat And Lock Washer Set, M6 X 20mm 8 50 Pcs Bolt Expansion Screw Shell Anchor Expansion Bolt, M8 X 70mm 9 10 Pcs Grinding Disc For Metal, Depressed Center, Aluminum-oxide, 100 Mm Ø 10 75 Kilo Welding Electrode, 1/8" Ø, E6013 11 8 Can Roofing Sealant, High Grade, 1/2l/can 12 8 Set Marine Epoxy, 1/2l/can 13 4 Roll Galvanized Cyclone Wire Ga8, 5 Feet X 6m (2 Inch Opening) 14 50 Meter Chain Hot Dipped Galvanized, Heavy Duty 8mm 15 10 Pcs Laminated Padlock 40mm/50mm Keyed Pad Lock Security Lock Solid Anti-theft, Made Up Of Multiple Layers Of Laminated Steel 16 20 Pcs Hacksaw Carbon Steel Blade Hd (12") 17 800 Pcs Chb 4" 18 100 Bags Portland Cement 19 30 Cu.m. Fine Aggregate (sand), 4.75mm Ø Max Size 20 150 Lgth Deformed Bar, 10mm Diameter X 6.0m Length 21 20 Kilo Gi Tie Wire, #16 22 200 Pcs Polished Tile, 600mm X 600mm Beige 23 10 Sheet Marine Plywood, 4' X 8', 1/2" Thk 24 10 Sheet Marine Plywood, 4' X 8', 1/4" Thk 25 20 Pair Soft Close Drawer Guide Heavy Duty, 18 Inch 26 6 Pcs Tile Cutter Wheel (dry) 100mm Ø 27 4 Pack Tile Grout (2 Kilo/pack) Beige 28 8 Gallon Paint, Flat Wall Enamel, Alkyd-based 29 10 Can Paint Thinner (3l/can) 30 10 Gallon Paint, Acrylic Semi-gloss, Water-based Paint (white Wash/tulle White) 31 10 Gallon Paint, Acrylic Semi-gloss, Water-based Paint (white) 32 8 Gallon Paint, Single Complonent Zinc Phosphate, Anti-corrosive Metal Primer 33 10 Gallon Paint, Odourless Qde, Water-based (suede/light Tan) 34 10 Gallon Paint, Quick Dry Enamel, Alkyd-based (red) 35 10 Gallon Paint, Quick Dry Enamel, Alkyd-based (orange) 36 10 Gallon Paint, Quick Dry Enamel, Alkyd-based (yellow) 37 10 Gallon Paint, Quick Dry Enamel, Alkyd-based (white) 38 8 Can Acrytex Primer 39 8 Can Acrytex Cast 40 8 Can Acrytex Reducer 41 10 Pcs Paint Brush, 2" 42 10 Pcs Paint Brush, 4" 43 8 Set Paint Roller 7-inch With Pan 44 100 Pcs Sand Paper Waterproof # 120 45 100 Pcs Sand Paper Waterproof # 160 46 75 Box Acoustic Foam Panels Self-adhesive Fireproof Sound Proof Treatment Wall, 300mm X 300mm X 8mm, Polyester Fiber, 0.9 Sound Absorption, (12 Pcs/box) 47 20 Pcs Rubber Cement, (360cc/bottle) 48 15 Pcs All Purpose Silicon Sealant (black) 49 5 Rolls Tw Copper Wire # 10 Awg (5.5 Mm²) 50 3 Rolls Tw Copper Wire # 12 Awg (3.5 Mm²) 51 4 Rolls Tw Copper Wire # 14 Awg (2.0 Mm²) 52 10 Pcs Utility Box, 2" X 4" 53 15 Pcs Junction Box W/ Cover & Screws 54 6 Rolls Flexible Hose Pvc, 1/2" X 100m 55 10 Pcs Circuit Breaker W/ Inclosure, 30a 56 10 Pcs Circuit Breaker W/ Inclosure, 20a 57 15 Pcs Led Exit Signage Emergency Acrylic 3 Watts Clear Aluminum Box, Overcharge Protection, Led Charging Indicaton, Automatic Switch Ni-cd 1.2v Battery And Charger, Pmma (polymethyl Methacrylate) Board 58 20 Pcs Led Parlamp E27, 12w-15w, 180 - 265v, Daylight 59 20 Pcs Led Bulb E27, 12w-15w, 180 - 265v, Daylight 60 10 Rolls Electrical Vinyl Tape, Flame Retardant, Professional Grade, 3/4" X 66' X 0.007", 600v @ 80° C Rating 61 4 Pcs Gate Valve, Brass, 1 1/2" Heavy Duty, 150psi 62 4 Pcs Gate Valve, Brass, 1" Heavy Duty, 150psi 63 40 Pcs. Stainless Heavyduty Flexible Hose, 16" Length (1/2" X 1/2") 64 10 Set Stainless (304) Shower Set; With Shower Head Set, With Hose And Holder And Two Way Faucet 65 20 Set Toilet Flush Set Fittings Dual Button Flush Valve Toilet Inlet Valve Toilet Fittings 66 20 Pcs. Stainless (304) One Way Angle Valve (1/2" X 1/2") 67 20 Pcs. Stainless (304) Two Way Angle Valve (1/2" X 1/2" X 1/2") 68 20 Pcs. Stainless (304) Bidet Toilet Sprayer And Hose 69 20 Pcs. Stainless (304) Urinal Flush Valve 70 10 Pcs. Floor Drain, Anti-clogging, 4" X 4" Stainless (304) 71 20 Lgth Ppr Pipe Pn20, 20mm Ø Nominal X 4.0m 72 10 Pcs. Ppr Elbow Pn20, 20mm Ø 73 6 Pcs. Ppr Elbow Pn20, 25mm Ø 74 10 Pcs. Ppr Coupling Pn20, 20mm Ø 75 20 Pcs. Ppr Coupling Pn20, 25mm Ø 76 20 Pcs Ppr Tee Pn20, 20mm Ø 77 10 Pcs Ppr Tee Pn20, 25mm Ø 78 8 Pcs. Ppr Coupling Reducer Pn20, 25mm X 20mm 79 30 Pcs. Ppr Threaded Female Elbow W/ Brass Pn20, 20mm 80 10 Pcs. Ppr Threaded Female Tee W/ Brass Pn20, 20mm 81 10 Pcs. Ppr Threaded Female Adapter Coupling W/ Brass Pn20, 20mm 82 10 Pcs. Ppr Threaded Male Adapter Coupling W/ Brass Pn20, 20mm 83 10 Pcs. Ppr Threaded Female Adapter Coupling W/ Brass Pn20, 25mm 84 10 Pcs. Ppr Threaded Male Adapter Coupling W/ Brass Pn20, 25mm 85 15 Pcs. Ppr Threaded Male Union Pn20, 25mm 86 15 Pcs. Ppr Threaded Male Union Pn20, 20mm 87 15 Pcs. Ppr Threaded Female Union Pn20, 25mm 88 15 Pcs. Ppr Threaded Female Union Pn20, 20mm 89 10 Pcs. Ppr Gate Valve Pn20, 25mm 90 10 Pcs. Ppr Gate Valve Pn20, 20mm 91 10 Lgth Sanitary Pipe Pvc, S-1000, 100mmø X 3.0 92 10 Lgth Sanitary Pipe Pvc, S-1000, 50mmø X 3.0 93 4 Pcs Sanitary Tee Pvc, S-1000, 100mmø 94 2 Pcs Sanitary Elbow Pvc, S-1000, 100mmø 95 4 Pcs Sanitary Wye Pvc, S-1000, 100mmø 96 5 Pcs Sanitary Coupling Pvc, S-1000, 100mmø 97 6 Pcs Sanitary Clean-out Pvc, S-1000, 100mmø 98 10 Pcs Sanitary Tee Pvc, S-1000, 50mmø 99 10 Pcs Sanitary Elbow Pvc, S-1000, 50mmø 100 10 Pcs Sanitary Coupling Pvc, S-1000, 50mmø 101 4 Can Pvc Pipe Cement, 400cc 102 20 Pcs Teflon Tape Pipe Thread Seal Tape, 1" X 10m The Approved Budget For The Contract Is To Be Taken From Improvement Of Operation Center (res. No. 485 Series 2024 Ordinance No. 36). Partial Bids Are Allowed, However, Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. In Order To Qualify, Bidders Should Conform To The Eligibility Criteria As Prescribed Under Sec. 23 And 25 Of The Revised Irr-a Of R.a. 9184. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary "pass/fail" Criteria As Specified In The Revised Irr-a Of R.a. 9184. As Such Non-submission Of Any Of The Required Documents Will Result In The Disqualification Of The Bidder. Due To Covid-19 Pandemic And Quarantine Regulations Of Every Provinces, Presence Of The Bidders Is Not Necessary. The Bids And Awards Committee (bac) Allows The Submission Of Bids Through Electronic Means And Submission Through Courier Services. The Following Documents Are Required For Submission: A. Eligibility Documents Including Technical Documents (1st Envelope): 1. Registration Certificate From Dti For Sole Proprietorship, Sec For Corporation Or Cda For Cooperative. 2. Valid And Current Mayor's Permit Where The Principal Place Of Business Of The Bidder Is Located. 3. Bir Registration Certificate With Taxpayer’s Identification Number. 4. Statement Of The Bidder Of All Its Ongoing And Completed Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid, Within The Relevant Period Where Applicable. The Statement Shall Be Supported With A Copy Of The Contracts/purchase Or Job Orders; And End-users Acceptance Or Delivery Receipt Duly Acknowledged. The Bidder Must Have Completed Within A Period Of Five (5) Years From The Date Of Submission And Receipt Of Bids, A Single Contract That Is Similar To The Contract To Be Bid Whose Value Must Be At Least Fifty (50%) Percent Of The Abc. However, In The Case Of Expendable Supplies, Said Single Contract Must Be At Least Twenty Five (25%) Percent Of The Abc, Or; The Bidder Should Have Completed At Least Two (2) Similar Contracts And The Aggregate Contract Amounts Should Be Equivalent To At Least The Percentage Of The Abc As Required Above. 5. Certificate Of Product Registration (cpr) From Food And Drug Administration (fda). (for Medicine Only)* 6. Certificate Of Good Manufacturing Practice From Fda. (for Medicine Only)* 7. Batch Release Certificate From Fda. (for Medicine Only)* 8. If The Supplier Is Not The Manufacturer, Certification From The Manufacturer That The Supplier Is An Authorized Distributor/dealer Of The Product(s)/item(s). (for Medicine Only)* 9. License To Operate (fda). (for Medicine Or Medical Supplies/equipment)* 10. Certificate Of Accreditation From Bureau Of Local Government Finance (blgf) (for Accountable Forms Only)* 11. Audited Financial Statements, Showing, Among Others, The Bidder's Total And Current Assets And Liabilities, Stamped "received" By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission. 12. The Bidder's Updated Computation For Its Net Financial Contracting Capacity (nfcc) Bearing The Date Thereof Must At Least Be Equal To The Abc To Be Bid, Or A Commitment From A Universal Or Commercial Bank To Extend A Credit Line In Favor Of The Bidder If Awarded The Contract To Be Bid (cl) Must At Least Be Equal To Ten Percent (10%) Of The Abc To Be Bid.* 13. Valid Joint Venture Agreement (jva), In Case Venture Is Already In Existence. 14. All Bids Must Be Accompanied By Bid Security In Any Or Combination Of The Acceptable Forms (below):* Form Of Bid Security Amount Of Bid Security A) Cash, Cashier's/manager's Check, Bank Draft/guarantee Confirmed By A Universal Or Commercial Bank. Two Percent (2%) B) Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank; Provided, However, That It Shall Be Confirmed Or Authenticated By A Commercial Or Universal Bank'; If Issued By A Foreign Bank. C) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security. Five Percent (5%) D) Bid Securing Declaration Prospective Bidder May Also Submit Bid Securities In The Form Of Cashier's/manager's Check, Bank Draft/guarantee, Or Irrevocable Letter Of Credit From Other Banks Certified By The Bsp As Authorized To Issue Financial Statement. Bids And Bid Securities Shall Be Valid For A Reasonable Period As Determined By The Head Of The Procuring Entity, But In No Case Shall Exceed 120 Calendar Days From The Date Of The Opening Of Bids. 15. Production/delivery Schedule.* 16. Manpower Requirements* 17. After-sales Service/parts (if Applicable) 18. Sworn Statement By The Prospective Bidder Or Its Duly Authorized Representative As To The Following: A) It Is Not Blacklisted Or Barred From Bidding By The Gop Or Any Of Its Agencies; Office Corporations, Or Lgu's, Including Foreign Government/foreign Or International Financing Institutions Whose Blacklisting Rules Have Been Recognized By The Gppb; B) Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statement And Information Provided Therein Are True And Correct; C) It Is Authorizing The Head Of Procuring Entity Or The Duly Authorized Representative/s To Verify All Documents Submitted; D) Authority Of The Signatory; E) Affidavit Of Disclosure Of No Relationship; F) Certification On Bidder's Responsibilities; G) It Comply With Existing Labor Laws And Standards, In The Case Of Procurement Of Services; H) It Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Activity, And I) In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. 19. Technical Specifications With Brochures, If Applicable.* 20. Certificate Of Philgeps Registration* 21. Tax Clearance* 22. Latest Income And Business Tax Returns (quarterly/monthly); (optional/required Upon Post-qualification)** Note:*required Documents To Be Submitted By Pre-qualified Suppliers/bidders Per Bac Resolution No. 74-g Dated July 30, 2019. **optional Submission During The Opening Of Bids But Mandatory Requirement Upon Post-qualification Per Bac Resolution No. 58-d Dated August 4, 2020. B. Financial Documents: (2nd Envelope) (a) Bid Prices In The Bill Of Quantities Failure To Submit The Above Requirements On Time Or A Finding Against The Veracity Of Such Shall Be Ground For The Forfeiture Of The Bid Security And Disqualify The Bidder For Award. Performance Security And Warranty Shall Be Governed By The Provisions Of Secs. 39 And 62, Respectively, Of The Revised Irr-a Of R.a. 9184. Bid Documents Can Be Obtained Upon Payment Of Non-refundable Fee Equivalent To The Total Amount Of The Abc Of The Items In Which Interested Bidders Intend To Bid, In Accordance With The Guidelines On The Sale Of Bidding Documents, Appendix 25 Of The Revised Irr Of R.a. 9184: Approved Budget For The Contract (abc) Maximum Cost Of Bidding Documents (in Philippine Peso) 500,000 And Below 500.00 More Than 500,000 Up To 1 Million 1,000.00 More Than 1 Million Up To 5 Million 5,000.00 More Than 5 Million Up To 10 Million 10,000.00 More Than 10 Million Up To 50 Million 25,000.00 More Than 50 Million Up To 500 Million 50,000.00 More Than 500 Million 75,000.00 Bid Documents Can Be Obtained At The Bac Secretariat, Office Of The Bids And Awards Committee, This City, Tel. No. (035) 402-8047, Anytime During Office Hours; And Can Also Be Inquired For Further Information Or Particulars. All Other Particulars Relative To The Procurement Process Shall Be Governed By The Revised Implementing Rules And Regulations Of R.a. 9184 Otherwise Known As The Government Procurement Reform Act. Pre-bid Conference Will Be On January 14, 2025, 1:30 P.m. At The City Budget Office, 2nd Floor, City Hall Annex Building, This City. Eligibility Requirements Including Technical Documents And Financial Documents Shall Be Submitted Together Each In Separate Sealed Envelopes Duly Marked As Such On January 28, 2025 At The City Budget Office, 2nd Floor, City Hall Annex Building, This City, At 1:30 Pm At Which Date, Place, And Time Said Envelopes Shall Be Opened In The Presence Of The Members Of The Bac, The Attending Bidders, The Observers, Or Their Duly Authorized Representative. Late And Unsealed Bids Shall Not Be Accepted. The City Government Of Bais Reserves The Right To Accept Or Reject Any Bid, And To Annul The Bidding Process And Reject All Bids At Anytime Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. (sgd.) Atty. Romela Mae L. Napao City Administrator Chair, Bids And Awards Committee
Closing Date28 Jan 2025
Tender AmountPHP 1 Million (USD 18.1 K)

Department Of Public Works And Highways - DPWH Tender

Civil And Construction...+1Others
Corrigendum : Closing Date Modified
Philippines
Details: Description Republic Of The Philippines Department Of Public Works And Highways Mindoro Oriental District Engineering Office Masipit, Calapan City, Oriental Mindoro, Mimaropa Region (iv-b) October 25, 2024 Invitation To Bid For The Following Projects: (gaa Fy 2025 Projects) 1. 25ed0020 – Construction Of Bucayao River Control At Camansihan Section, Calapan City, Oriental Mindoro 2. 25ed0021 - Construction Of Bucayao River Control At Managpi Section, Calapan City, Oriental Mindoro 3. 25ed0022 - Construction Of Flood Control Structure Along Mag-asawang Tubig River, Barangay Pinagsabangan 2 – Barangay Motoderazo, Naujan, Oriental Mindoro 4. 25ed0023 - Construction Of Road, Caagutayan – Bigaan Circumferential Road, San Teodoro, Oriental Mindoro 5. 25ed0024 - Construction Of Road, Suqui – Parang Bypass Road, Calapan City, Oriental Mindoro 6. 25ed0025 - Rehabilitation Of Bridge, Barangay Tacligan, San Teodoro, Oriental Mindoro 7. 25ed0026 - Construction Of Flood Control Structure, Longos Bridge 1st Approach, Downstream, Calapan City, Oriental Mindoro 8. 25ed0027 - Construction Of Seawall Structure, Villa Antonio, Barangay Navotas, Calapan City, Oriental Mindoro 9. 25ed0028 - Construction Of Flood Control Structure, Barangay Gutad, Calapan City, Oriental Mindoro 10. 25ed0029 - Construction Of Flood Control Structure, Sitio Bagong Pook, Barangay Gutad, Calapan City, Oriental Mindoro 11. 25ed0030 - Retrofitting/strengthening Of Antipolo Br. (b00224mr) Along Calapan South Road, Oriental Mindoro 12. 25ed0031 - Construction Of Concrete Road, Barangay Sta. Isabel, Naujan, Oriental Mindoro 13. 25ed0032 - Construction Of Concrete Road, Phase Ii, Barangay San Antonio, Victoria, Oriental Mindoro 14. 25ed0033 - Construction Of Concrete Road, Phase Ii, Sitio Ginhawa, Barangay Subaan, Socorro, Oriental Mindoro 15. 25ed0034 - Construction Of Concrete Road, Sitio Acacia To Sitio Sabang, Leuteboro I, Socorro, Oriental Mindoro 1. The Department Of Public Works And Highways – Mindoro Oriental District Engineering Office, Through The Gaa 2025 Intends To Apply The Sums Below Of Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Following. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Contract I.d. No. Approved Budget For The Contract 25ed0020 Php 49,000,000.00 25ed0021 Php 49,000,000.00 25ed0022 Php 39,200,000.00 25ed0023 Php 29,400,000.00 25ed0024 Php 22,123,500.00 25ed0025 Php 29,700,000.00 25ed0026 Php 98,000,000.00 25ed0027 Php 68,600,000.00 25ed0028 Php 99,000,000.00 25ed0029 Php 68,600,000.00 25ed0030 Php 2,352,000.00 25ed0031 Php 4,900,000.00 25ed0032 Php 4,900,000.00 25ed0033 Php 4,900,000.00 25ed0034 Php 4,900,000.00 2. The Department Of Public Works And Highways – Mindoro Oriental District Engineering Office Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: 2.1 Contract I.d. No. : 25ed0020 Name Of Contract : Construction Of Bucayao River Control At Camansihan Section, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 132.40 L.m. Concrete Revetment Resting On Concrete Pile Cap With 12 M. Steel Sheet Piles (u-type Iii) Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 273 C.d. 2.2 Contract I.d. No. : 25ed0021 Name Of Contract : Construction Of Bucayao River Control At Managpi Section, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 130.00 L.m. Concrete Revetment Resting On Concrete Pile Cap With 12 M. Steel Sheet Piles (u-type Iii) Approved Budget For The Contract : Php 49,000,000.00 Contract Duration : 273 C.d. 2.3 Contract I.d. No. : 25ed0022 Name Of Contract : Construction Of Flood Control Structure Along Mag-asawang Tubig River, Barangay Pinagsabangan 2 – Barangay Motoderazo, Naujan, Oriental Mindoro Location : Naujan, Oriental Mindoro Scope Of Works : Construction Of 52.00 L.m. Road Dike With Geotube Resting On Concrete Pile Cap With 12 M. Steel Sheet Piles (u-type Iii) Approved Budget For The Contract : Php 39,200,000.00 Contract Duration : 263 C.d. 2.4 Contract I.d. No. : 25ed0023 Name Of Contract : Construction Of Road, Caagutayan – Bigaan Circumferential Road, San Teodoro, Oriental Mindoro Location : San Teodoro, Oriental Mindoro Scope Of Works : 1. Concreting Of 1,694.00 L.m. Of Road (width = 5.00 M., 0.20 Thk. Pccp, 0.20 Thk. Aggregate Subbase Course) With 1.00 M. Asbc Shoulder Canal. 2. Construction Of 1 X 0.9d Rcpc And Slope Protection. Approved Budget For The Contract : Php 29,400,000.00 Contract Duration : 176 C.d. 2.5 Contract I.d. No. : 25ed0024 Name Of Contract : Construction Of Road, Suqui – Parang Bypass Road, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : 1. Concreting Of 525 L.m. Road (width = 3.35 M. (b/s), 0.28 M. Thk. Pccp, 0.20 M. Thk. Aggregate Subbase Course) 2. Concreting Of 525 L.m. Shoulder (width = 1.0 M. (b/s), 0.23 M. Thk. Pccp, 0.20 M. Thk. Aggregate Subbase Course) 3. Construction Of Drainage Canal: Sta. 0+570.00 – Sta. 1+095.00 525.00 L.m. R/s Sta. 0+570.00 – Sta. 1+304.50 734.50 L.m. L/s Approved Budget For The Contract : Php 22,123,500.00 Contract Duration : 192 C.d. 2.6 Contract I.d. No. : 25ed0025 Name Of Contract : Rehabilitation Of Bridge, Barangay Tacligan, San Teodoro, Oriental Mindoro Location : San Teodoro, Oriental Mindoro Scope Of Works : 1. Concreting Of 330.00 L.m. Of Road (width = 5.00 M., 0.23 M. Thk. Pccp, 0.20 M. Thk Aggregate Subbase Course) With 1.50 M. Gravel Shoulder On B/s 2. Construction Of 140.00 M. Of Slope Protection On B/s. 3. Remove And Construction Of 30 M. Of Tacligan Bridge. 4. Installation Of 13 Solar Led Streetlights. Approved Budget For The Contract : Php 29,700,000.00 Contract Duration : 279 C.d. 2.7 Contract I.d. No. : 25ed0026 Name Of Contract : Construction Of Flood Control Structure, Longos Bridge 1st Approach, Downstream, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 292.40 L.m. Concrete Revetment Resting On Concrete Pile Cap With 12 M. Steel Sheet Piles (u-type Iii) Approved Budget For The Contract : Php 98,000,000.00 Contract Duration : 333 C.d. 2.8 Contract I.d. No. : 25ed0027 Name Of Contract : Construction Of Seawall Structure, Villa Antonio, Barangay Navotas, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 190.40 L.m. Of Seawall Structure Resting On Concrete Pile Cap With 12 M. Steel Sheet Piles U-type Iii Approved Budget For The Contract : Php 68,600,000.00 Contract Duration : 314 C.d. 2.9 Contract I.d. No. : 25ed0028 Name Of Contract : Construction Of Flood Control Structure, Barangay Gutad, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 271.20 L.m. Concrete Revetment Resting On Concrete Pile Cap With 12 M. Steel Sheet Piles (u-type Iii) Approved Budget For The Contract : Php 99,000,000.00 Contract Duration : 333 C.d. 2.10 Contract I.d. No. : 25ed0029 Name Of Contract : Construction Of Flood Control Structure, Sitio Bagong Pook, Barangay Gutad, Calapan City, Oriental Mindoro Location : Calapan City, Oriental Mindoro Scope Of Works : Construction Of 183.20 L.m. Concrete Revetment Resting On Concrete Pile Cap With 12 M. Steel Sheet Piles (u-type Iii) Approved Budget For The Contract : Php 68,600,000.00 Contract Duration : 314 C.d. 2.11 Contract I.d. No. : 25ed0030 Name Of Contract : Retrofitting/strengthening Of Antipolo Br. (b00224mr) Along Calapan South Road, Oriental Mindoro Location : Socorro, Oriental Mindoro Scope Of Works : 1. Repair Of Bridge Using Carbon Fiber Sheets (2-layer). Approved Budget For The Contract : Php 2,352,000.00 Contract Duration : 115 C.d. 2.12 Contract I.d. No. : 25ed0031 Name Of Contract : Construction Of Concrete Road, Barangay Sta. Isabel, Naujan, Oriental Mindoro Location : Naujan, Oriental Mindoro Scope Of Works : 1. Remove Pccp W=4.0 M., Length=326.00 L.m. & Replace Pccp With W=6.0 M. 2. Remove Pccp W=5.0 M., Length=121.00 L.m. & Replace Pccp With W=6.0 M. Thickness=0.20 M.; Aggregate Subbase Course Thickness=0.20 M. Total Length Of Road = 453.00 L.m. Approved Budget For The Contract : Php 4,900,000.00 Contract Duration : 88 C.d. 2.13 Contract I.d. No. : 25ed0032 Name Of Contract : Construction Of Concrete Road, Phase Ii, Barangay San Antonio, Victoria, Oriental Mindoro Location : Victoria, Oriental Mindoro Scope Of Works : 1. Concreting Of 392 L.m. Of Road (width = 5.00 M., 0.20 M. Thk. Pccp, 0.20 M. Thk. Aggregate Subbase Course) With 1.00 M. Asbc Shoulder 2. Concreting Of 76 L.m. Of Road (width = 5.00 M., 0.20 M. Thk. Pccp, 0.20 M. Thk. Aggregate Subbase Course) With 1.00 M. Asbc Shoulder Approved Budget For The Contract : Php 4,900,000.00 Contract Duration : 69 C.d. 2.14 Contract I.d. No. : 25ed0033 Name Of Contract : Construction Of Concrete Road, Phase Ii, Sitio Ginhawa, Barangay Subaan, Socorro, Oriental Mindoro Location : Socorro, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thk = 0.20 M.) With Total Length Of 446 M. With 1.00 M. Gravel Shoulder On Both Sides. Approved Budget For The Contract : Php 4,900,000.00 Contract Duration : 69 C.d. 2.15 Contract I.d. No. : 25ed0034 Name Of Contract : Construction Of Concrete Road, Sitio Acacia To Sitio Sabang, Leuteboro I, Socorro, Oriental Mindoro Location : Socorro, Oriental Mindoro Scope Of Works : 1. Concreting Of 5 M. Width Road (thickness = 0.20 M., Aggregate Subbase Course Thickness = 0.20), With 0.50 M. Gravel Shoulder On Both Sides, With Total Length Of 412.00 M.; With Stone Masonry Slope Protection At Intermittent Section. Approved Budget For The Contract : Php 4,900,000.00 Contract Duration : 69 C.d. Bidders Should Have Completed A Contract Similar To The Project. Prospective Bidders Should Be Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category. The Description Of An Eligible Bidders Is Contained In The Bidding Documents, Particularly, In Section Ii (instruction To Bidders). Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 8:00 Am To 5:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. In View Of The Full Implementation On Assigning Only Qualified And Competent Engineers Of The Contractors And Consultants In The Implementation Of Dpwh Projects, Please Be Reminded Of Department Order No. 98 S. 2016 “limits Of Assignment Of Contractors’/consultants’ Materials Engineers” And Department Order No. 118 S. 2024 “guideline On The Accreditation And Assignment Of Contractor’s And Consultants’ Project Engineers”. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 5. Prospective Bidders May Obtain Further Information From The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office And Inspect The Bidding Documents At The Address Given Below During 8:00 Am To 5:00 Pm. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On October 29 – November 19, 2024 From The Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Following Amounts: Contract I.d. Number Amount 25ed0020 Php 25,000.00 25ed0021 Php 25,000.00 25ed0022 Php 25,000.00 25ed0023 Php 25,000.00 25ed0024 Php 25,000.00 25ed0025 Php 25,000.00 25ed0026 Php 50,000.00 25ed0027 Php 50,000.00 25ed0028 Php 50,000.00 25ed0029 Php 50,000.00 25ed0030 Php 5,000.00 25ed0031 Php 5,000.00 25ed0032 Php 5,000.00 25ed0033 Php 5,000.00 25ed0034 Php 5,000.00 7. The Bidding Documents May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office Will Hold A Pre-bid Conference On November 5, 2024 @ 9:30 A.m. At Bidding Room, Dpwh – Modeo, Masipit, Calapan City, Oriental Mindoro And/or Through Video Conferencing Or Webcasting Via Zoom Which Shall Be Open To Prospective Bidders. 9. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_mindorooriental@dpwh.gov.ph For Electronic Submission On Or Before November 19, 2024 @ 10:00 A.m. Late Bids Shall Not Be Accepted. 11. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 12. Bid Opening Shall Be On November 19, 2024, Immediately After The Deadline For The Submission Of Bid At Bidding Room, Dpwh – Modeo, Masipit, Calapan City, Oriental Mindoro And/or Through Zoom. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 13. The Department Of Public Works And Highways, Mindoro Oriental District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 14. For Further Information, Please Refer To: Engr. Agnes M. Bueno Department Of Public Works And Highways Mindoro Oriental District Engineering Office Masipit, Calapan City, Oriental Mindoro Bueno.agnes@dpwh.gov.ph (043) 288-9365 Albien M. Mahia Bac Chairperson
Closing Date30 Jan 2025
Tender AmountPHP 68.6 Million (USD 1.1 Million)

Oriental Mindoro Tender

Publishing and Printing
Philippines
Details: Description Republic Of The Philippines Province Of Oriental Mindoro Municipality Of Pinamalayan Office Of The Bids And Awards Committee Invitation To Bid Itb-2025-02 1. The Municipal Government Of Pinamalayan, Oriental Mindoro, Through The Authorized Appropriations Under The General Fund Intend To Apply The Sum Of Two Million Three Hundred Thousand Four Hundred Ninety Nine Pesos Only (2,300,499.00) Being The Approved Budget For The Contract (abc) For The Project “ Procurement Of Office Supplies, Toner And Ink For 1st Qtr. 2025. Attachment Annex A For Technical Specification Shall From Part Of Itb 2025-02 Lot No. Description Amount 1 Regular Office Supplies 1,404,469.00 2 Toner 247,640.00 3 Ink 648,390.00 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. Submission And Receipt Of Bids At Least One (1) Contract Similar To The Project And Whose Value Must Be At Least Fifty Percent (50%) Of The Approved Budget For The Contract (abc). The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly In Section 5, Instruction To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (r.a. 9184), Otherwise Known As The “government Procurement Reform Act”. 4. Bid Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Non-refundable Fee Amounting To Php 5,000.00 For The Bidding Documents. The Invitation To Bid And Bidding Documents May Be Downloaded From The Website Of The Philippine Government Electronic System (philgeps) And Municipal Government Website (www.pinamalayan.gov.ph) 5. The Schedule Of Bidding Activities Shall Be As Follows: Activities Schedule Venue Sale And Issuance Of Bid Documents January 9, 2025,- February 4, 2025 Bac Office Pre Bid Conference January 22, 2025 At 9:00 O’clock In The Morning Bac Office Submission Of Bids February 4, 2025 At 5:00 O’clock In The Afternoon Bac Office Opening Of Bids February 5, 2025 At 9:00 O’clock In The Morning Bac Office Pre Bid Conference Is Open To All Interested Bidders. For Purposes Of Having A Legal Personality To Raise Or Submit Written Queries Or Clarifications In The Pre-bid Conference Relative To The Bid Project, Bidders Must Pay The Non-refundable Fee For The Bidding Documents On Or Before The Date Of The Pre-bid Conference. For The Pre-bid Conference, Bidders Are Encouraged To Send Their Authorized Technical Representatives Or Personnel, Who Are Familiar With The Bid Requirements And Will Prepare The Documents For The Bidder 6. The Eligibility Requirements And Bid Proposal Documents Must Be Sequentially Compiled In Accordance With The Checklist With Index Table And Table Of Contents For Easy Document Review. 7. The Municipal Government Of Pinamalayan Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. The Municipal Government Of Pinamalayan Likewise Assumes No Obligation Whatsoever To Compensate Or Indemnify Any Bidder Or Winning Bidders, As The Case May Be, For Any Expenses Or Loss That Said Party(ies) May Incur In Its Participation In The Pre-bidding And Bidding Process Nor Does It Guarantee That An Award Will Be Made. For Further Information, Please Refer To: Enrique N. Mocling Bac Secretariat Madrid Blvd. Pinamalayan Oriental Mindoro Telephone #: 284-4517 Email Address: Bacpinamalayan@yahoo.com Approved By: Carlito M. Mejico , Cpa, Reb Municipal Assessor Bac Chairperson Date Of Publication: Posted Philgeps : Newspaper : Not Applicable Agency Website : January 9, 2025-february 4, 2025 Posted 3 Conspicuous Places: Mun. Hall Bulletin Board Lobby – January 9, 2025-february 4, 2025 2. Dilg/abc Announcement Wall – January 9, 2025-february 4, 2025 3. Pinamalayan Public Market – January 9, 2025-february 4, 2025 Technical Specs For 1st Qtr. 2025 Item Description Unit Quantity Ballpen Black 0.8 Tt Black Boxes 3 Ballpen Hbw Black Boxes 6 Ballpen Black Flexstick 0.5 (black) Boxes 45 Ballpen Black Flexstick 0.5 (red,purple,green,blue) Boxes 11 Ballpen Pilot Black Boxes 54 Ballpen, Fiber Castle Black,blue And Red Boxes 11 Ballpoint, Ordinary 50 Pcs Tube Black,blue And Red Tube 6 Sign Pen,black Liquid/vio Grip, Hi Techpoint .05 V10 Boxes 33 Sign Pen,black Liquid/g-tech, 0.4 Mm Needle Tip Boxes 14 Sign Pen Liquid/g-tech 0.5mm Needle Tip Black,green,red And Blue Boxes 35 Sign Pen Liquid/gel Ink 0.5mm Needle Tip Black/blue Boxes 10 Sign Pen 0.5 - My Gel Black Boxes 43 Sign Pen My Gel Red, Green & Violet Boxes 7 Sign Pen Hi-tech Point V5 1.0 Black,red & Blue Boxes 14 Sign Pen Black Water & Faded Proof Pigment Ink 0.6mm Boxes 5 Pencil No. 2 Boxes 30 Pencil No. 1 Boxes 12 Mechanical Lead Pencil, Refill Steadler Pcs 5 Highlighter Pcs 60 Highlighter (14 Pcs) Boxes 2 Marker Pentel Pen (black,red & Blue) Pcs 46 Marker Pentel Pen Boxes 6 Marker White Board Black, Blue And Red Pcs 46 Marker White Board Black Boxes 4 Correction Pen Pcs 20 Correction Tape Pcs 89 Correction Tape (ordinary) Pcs 147 Coupon Bond Long S20 Reams 1100 Coupon Bond Short S20 Reams 744 Paper A3, Bond Reams 19 Paper A4, Bond Reams 24 Book Paper Long Reams 213 Book Paper Short Reams 164 Book Paper A4 Reams 3 Colored Bond (assorted) Reams 9 Accounting Folder (long) Pcs 1013 Accounting Folder (long) (100pcs) Boxes 7 Ordinary Folder White (long) Pcs 640 Ordinary Folder White (short) Pcs 127 Looseleaf Folder - Legal Pcs 807 Brown Envelope Long Pcs 611 Brown Envelope Short Pcs 88 Expanding Envelope Long Size Pcs 149 Expanding Envelope With String, Long Pcs 174 Expanding Folder Legal Size Pcs 32 Paper Laid Long Cream/white Packs 5 Paper Laid Short Cream/white Packs 5 Index Card 1/2" Packs 4 Colored Index Card Tubbings Packs 3 Photo Paper A4 Packs 34 Photo Paper Long Packs 8 Acetate Film (long) Reams 3 Vellum Board Long Cream/white Reams 22 Vellum Board Long Cream/white Packs 5 Vellum Board A4 Cream/white Reams 7 Vellum Board Short Cream/white Reams 7 Vellum Board Short Cream/white Packs 4 Special Paper Long 22g Packs 31 Special Paper Short 22g Packs 1 Tracing Roll Paper 36" Pcs 1 Roll Bond Paper 36" Rolls 6 Glossy Roll Paper (220 Gsm) 36" Reams 1 Yellow Paper Pads 24 Yellow Paper Bundle 2 Sticker Paper A4 Packs 28 Arts File Pcs 29 Dtr Pcs 160 Dtr Reams 2 Carbon Paper Reams 3 Carbon Paper Blue Reams 3 Envelope Mailing White Legal Packs 5 Envelope Mailing White Legal Boxes 5 A4 Size Pvc Card Sheet For Id (50 Sheets) Reams 4 Lct Pvc X Mm Long Boxes 2 Lct Pvc X Mm Short Boxes 2 Pvc Clear Binding Cover Long Packs 15 Plastic Envelope, Legal Size Pcs 14 Record Book/logbook (500pp) Red & Black #85 Pcs 15 Record Book, #45, 200 Pages Pcs 30 Record Book , #99, 300 Pages Pcs 17 Record Book #99, 500 Pages Pcs 9 Record Book, #85, 300 Pages Pcs 29 Record Book #85, 150 Pages Pcs 7 Logbook Blue 500 Leaves Pcs 12 Logbook Blue 300 Leaves Pcs 1 Logbook Blue 150 Leaves Pcs 5 Notebook W/ Cover 80 Leaves Pcs 11 Notebook (field Notebook) Pcs 44 Notebook 60 Sheets Pcs 24 Columnar Notebook 14 Columns Pcs 10 Columnar Notebook 24 Columns Pcs 4 Class Record Pcs 6 Battery Aa (4pcs) Dry Cell Heavy Duty Set 26 Battery Aa Dry Cell Heavy Duty Pcs 68 Battery Aa Dry Cell Heavy Duty Boxes 6 Battery Aaa (4pcs) Dry Cell Heavy Duty Set 14 Battery Aaa Dry Cell Heavy Duty Pcs 10 Battery Aaa Dry Cell Heavy Duty Boxes 5 Paper Clip Jumbo Boxes 55 Paper Clip Big Boxes 29 Paper Clip Small Boxes 31 Paper Clip Big Box (10 Boxes) Boxes 9 Binder Clip 1/4 Boxes 72 Binder Clip 1/2" Boxes 31 Binder Clip 3/4 Boxes 91 Binder Clip 1 1/4 Boxes 29 Binder Clip 1 5/8 Boxes 52 Binder Clip 1 Boxes 117 Binder Clip 2" Boxes 105 Binder Clip 1/2 Boxes 16 Binder Clip 1/2 Big Box (10 Boxes) Boxes 12 Calculator (12digits) Pcs 14 Ruler Pcs 12 Heavy Duty Cutter A4 (metal Cutter) Pcs 1 Cutter Ordinary Pcs 5 Heavy Duty Cutter Small Pcs 2 Certificate Holder A4 Pcs 267 Certificate Holder (8.5'x11') Short Pcs 32 Certificate Holder (8.5'x14') Long Pcs 43 Dater Pcs 2 Number Stamp Pad Pcs 3 Double Adhesive/sided Tape .5" Pcs 17 Double Adhesive/sided Tape 1" Pcs 113 Eraser Stedler Pcs 8 Cd Rewritable, Speed: 4xmin, 4.7 Gb Capacity Min. Boxes 1 Flashdrive (16gb) Pcs 4 Flashdrive (32gb) Pcs 2 Flashdrive (64gb) Pcs 3 Fastener (plastic Coated) Boxes 67 Fastener 70mm Boxes 5 Fastener Plastic 6" Boxes 3 File Divider Pcs 22 4 Layer Desk File Organizer Document Paper Tray Pcs 6 File Desk Organizer Documents Storage Rack W/ 4 Vertical Compartment Pcs 23 Metal Document File Organize Rack Pcs 3 Glue 130g Bottles 37 Glue 240g Bottles 4 Glue 473g Bottles 4 Magazine Box Pcs 14 Push Pins, No. 3351 Boxes 10 Post It Sticky Flags Pads 26 Post It Sticky Flag Signed Here Boxes 10 Post It 2m Flag Signed Here 1x1.7 Inch Pads 10 Post It 3"x3" Pads 27 Post It 3"x4" Pads 60 Pos It, 2 X 3" Pads 29 Post It, 2x4" Pads 16 Ribbon Typewriter Pcs 8 Ribbon Cloth - 1" Red Roll 5 Ribbon Cloth - 1/2" Red Roll 5 Ring Binder 1/2" Pcs 46 Ring Binder, 1/8" Pcs 61 Ring Binder 3/4" Pcs 30 Ring Binder, 1 1/4" Pcs 8 Ring Binder, 1" Pcs 9 Ring Binder, 2" Pcs 12 Ring Binder 3mm Pcs 45 Ring Binder 6mm 1/4" 30 Sheets Pcs 52 Ring Binder 8mm 5/16" 50 Sheets Pcs 18 Ring Binder 12mm 1/2" 110 Sheets Pcs 18 Ring Binder 16mm-5/8-150's Pcs 13 Ring Binder 25mm-1-220's Pcs 10 Rubber Band Small Boxes 8 Rubber Band Big Boxes 16 Scissor, Big Pcs 21 Small Scissor Pcs 2 Masking Tape 1" Pcs 45 Masking Tape 2" Pcs 26 Packing Tape 2" Pcs 48 Scotch Tape 2" Pcs 74 Scotch Tape 1" Pcs 179 Scotch Tape 1/2 Pcs 10 Duct Tape Pcs 13 Stamp Pad Ink- Black, Purple Or Violet Pcs 40 Stamp Pad Big Pcs 4 Stamp Pad Joy Pcs 19 Staple Wire #35 Boxes 94 Note Pad Stick On 76mm X 76mm X 76mm (3" X 3") Min Pink Pads 2 Note Pad Stick On (3" X 4") Min Pink Pads 8 Note Pad Stick On 50mm X 76mm (2" X 3" ) Min Pads 22 Note Pad Stick On With Lines 4"x5" Pads 4 Arrow Tabbing, Plastic Pads 50 Stapler With Remover #35 Pcs 21 Tape Dispenser Pcs 22 Pencil Sharpener Pcs 3 Clip Board With Cover (legal Size) Pcs 2 Puncher Heavy Duty Pcs 8 Shoelace/cord Pcs 12 Shoelace/cord 3/8 Inch 144 Yards Rolls 3 Plastic Cover Roll 1 Plastic Cover (yard) Yard 5 Wireless Mouse Pcs 9 Mouse Pad Pcs 32 Continous Form 11x14x7/8 Bundle 0 Rj Connectors Boxes 1 Plastic Crate (20x14x12) Pcs 2 Toner Cartridge Docucentre S2011/2320/s2520/s2110 Tube 10 Toner Copier Gestetner Mp 2014ad, Mp 2051 & Mp 2501l Tube 11 Toner Fuji S1810 Tube 1 Toner (gestetner Mp 2014h) Tube 5 Toner For Copier Big Gestener Bottles 5 Toner (xerox Machine) Dsm-dsm618 Boxes 3 Toner Cartridge (black) Pcs 1 Toner Cartridge (magenta) Pcs 1 Toner Cartridge (cyan) Pcs 1 Toner Cartridge (yellow) Pcs 1 Toner (tk-4140) Bottles Toner Xerox Machine (apeos 2150) Boxes 2 Computer Ink (black) T6641 (epson) Bottles 37 Computer Ink (cyan) T6642 (epson) Bottles 16 Computer Ink (magenta) T6643 (epson) Bottles 15 Computer Ink (yellow) T6644 (epson) Bottles 16 664 Colored (epson) Set 5 664 (black,cyan,magenta And Yellow) (epson) Set 9 Ink 003 65ml Epson (black) Bottles 163 Ink 003 65ml Epson (cyan) Bottles 103 Ink 003 65ml Epson (yellow) Bottles 83 Ink 003 65ml Epson (magenta) Bottles 104 003 Colored Set 5 Ink 003 Black,cyan,magenta, Yellow Set 36 L3110 Printer Ink Black Pcs 2 L3110 Cyan Pcs 2 L3110 Magenta Pcs 2 L3110 Yellow Pcs 2 Ink Refill (ciss) Multicolor Set 31 Ink 001 (black) Pcs 53 Ink 001 (cyan) Pcs 36 Ink 001 (magenta) Pcs 36 Ink 001 (yellow) Pcs 37 Ink 001 Colored (yellow,cyan & Magenta) Set 2 Ink 001 (black,yellow,cyan And Magenta) Set 18 Ink 008 (black) Pcs 11 Ink 008 (cyan) Pcs 11 Ink 008 (magenta) Pcs 11 Ink 008 (yellow) Pcs 11 Computer Ink T673 Colored Bottles 2 Computer Ink T673 Black Bottles 4 Ribbon Cartridge Lx 310 Boxes 9 Ribbon Cartridge Lq2190 Boxes 5 Computer Ink Refill Black Bt D60 Bottles 1 Computer Ink Refill Cyan Bt 500 Bottles 2 Computer Ink Refill Yellow Bt500 Bottles 1 Computer Ink Refill Magenta Bt500 Bottles 1 Hp 728 Ink Black,cyan,magenta Ad Yellow Set 1 Ink Cartridge Pfi-102bk Bottles 1 Ink Cartridge Pfi-102c Bottles 1 Ink Cartridge Pfi-102m Bottles 1 Ink Cartridge Pfi-102y Bottles 1 Ink Cartridge Pfi-102mbk Bottles 1 Continous Ink Black 103 Pcs 18 Continous Ink Cyan 103 Pcs 8 Continous Ink Yellow 103 Pcs 8 Continous Ink Magenta 103 Pcs 8 Ink Epson 057 Set 1
Closing Date5 Feb 2025
Tender AmountPHP 2.3 Million (USD 39.3 K)

Municipality Of Rizal,palawan Tender

Healthcare and Medicine
Philippines
Details: Description Acquisition Of 1 Unit Mobile Clinic Vehicle With Diagnostic Equipment Package And Accessories • Mobile Aluminum Van With An Interior Length Of 16ft. • Insulated Walls And Additional Reinforcement For Industrial Purposes. • All Walls Are Finished With A Composite Panel For The Interior • Sliding Glass Door (inside) And Swing Door (outside) At The Main Entrance • Installation Of 2 Sliding Windows • Provide An Entrance Stair For The Main Entrance • Painting Of The Alluminum Body • Installation Of Sticker Signage (layout Provide By The Client) • Installation Of Electrical Wiring And Lights. • Provide A Fifty-meter #10 Royal Cord As A Connecting Cable Wire •installation Of 1 Split-type And 1 Window-type Air Conditioner. • Installation Of Flooring (marine Plywood And Vinyl Finishing) • Provide An X-ray Room Area With A Small Lead Glass For Viewing (attached To The Sliding Door) • Installation Of An X-ray Unit • Provide A Mini Laboratory Workstation • Provide A Doctor's Consultation/check-up Room With A Patient's Bed And Floor Cabinets • Provide A Water Tank, Sink, Portable Vacuum Toilet With A Waste Tank, And An Exhaust Fan • Installation Of A Canopy • Installation Of A Generator Set •installation Of The Base For A 2-way Radio In The Driver's Dashboard • Comes With Four Pieces Of Park Jack • Provide A Special Key For All Compartments • Wind Breaker Laboratory Equipment * 1 Unit Centrifuge 8 Placer Tabletop Centrifuge Speed 200-6,000rpm, Display Digital Display For Time And Speed Value (or R,c,f, Value) Timer 0-30min Digital Timer Motor Brushless Dc Max. R.c.f. 4,265xg Capacity 8x(10-15)ml. Standard Accessory 8x(10-15)ml. Tube Adapter Optional Accessory (5-7)ml. Or (1.5-2.0)ml Tube Adapter, Weight (kg) N,w. 4,8/g.w.5.8 Overall Dimension W280xd280xh265mm Power Supply Ac 100-240v 50/60hz * 1 Unit Semiauto Chemistry Analyzer Test Mode: Kinetic, Endpoint, Two Point, Absorbance, Wavelength: 7 Standard Filters, 340,405,492,510,546,578,630nm, 1 Free Position, Wavelength Precision: ±2nm,width≤10nm, Absorbance Range: 0-4,500 Abs, Absorbance Precision: Outside 0.0001 Abs, Inside 0.00001 Abs Carryover & Repeatability Cv; <1%, Incubator: 37ᶞc,30ᶞc,25ᶞc And Others, Precision: ±0.1ᶞc, Sample Volume: 0-3000ul(500ul Recommend), Data Storage: 1000, Quality Control Curve: X Sd Cv% L-j Quality Control Curve For Each Test Item, Flow Cell: 32 Ul Quartz Glass 10mm, Lamp: Philips 6v 10w Halogen Lamp With The Longer Lifetime, Screen: 7-inch Color Lcd, Cpu: Arm Series High-speed Cpu, Printer; Internal Thermal Sensitive Printer, Interface; Rs-232 Work Environment; Temperature 0ᶞc-40ᶞc, Humidity:80%, Power Supply; 100240vac, 5060hz, 100va Dimension: L340mm*w270mm*h160mm, Net Weight; 5kc & 10.5kg •initial 1 Set Of Reagents (cholesterol, Hdlc &triclycerides-r-1:60mlx2, R-2: 20ml.x2 320 Test, Alt, Ast, & Glu Cod-pap-r-1:60mlx2, R-2: 15ml.x2 300 Test, Creatinine-s-r-1:60mlx2, R-2: 20ml.x2 320 Test, And Urea, Uric Acid-r-1:60mlx2, R-2: 15ml.x2 300 Test * 1 Unit 3 Parts Hematology Analyzer Priinciple Impedance Method For Wbc, Rbc, And Plt Counting, Cyanide-free Reagent For A Hemoglobin Test 21 Parameters Wbc, Lymph#, Mid#, Gran#, Lymph%, Mid%, Gran%,rbc,hgb,hct,mcv,mch,mchc,rdw-cv,rdw-sd, Plt,mpv,pdw,pct,p-lcr,p-lcc 3 Histograms Wbc,rbc, And Plt Reagent M-30d Diluent, M-20cfl Lyse, Probe Cleanser Sample Volume Prediluted Mode (20ul)whole Blood Mode (9ul) Throughput 70 Samples Per Hour Display 10.4-inch Tft Touch Screen Data Storage Capacity: Up To 500,000 Results Including Numeric And Graphical Information. Communication Lan Port Supports Hl& Protocol Support Bi-directional Lis Interface; 4 Usb Ports (for External Printer, Software Upgrade, Barcode Reader, External Wifi, Keyboard And Mouse) Lan Port (t) Printout Thermal Recorder, 50 Mm Wide Paper, Various Printouts Formats, External Printer Optional Operating Environment Temperature 0ᶞc-40ᶞc, Humidity:10%-90% Air Presure: 70k Pa-106kpa, Power Requirement 100v-24ov, ≤3000va, 50hz/60 Hz Dimension: Depth (410mm) X Width (300mm) X Height (400mm) Weight ≤20kg •initial 1 Set Of Reagents Lyse-0.31ml/cycle 1500, Diluent 20ml/cycle 950, Cleanser 1 Bot. 25 * 1 Unit Microscope Observation Method Brightfield, Darkfield Illuminator Transmitted Illuminator, Led Lamp Focus Focusing Mechanism: Stage Focus, Coarse Handle Stroke: 15mm, Coarse Adjustment Limit Stopper, Torque Adjustment For Coarse Adjustment Knob Field Diaphragm Binocular (option: Cx23-fs), Trinocular Revolving Nosepiece Manual, Standard (4 Positions) Stage Manual Stages With Right-hand Control, Built-in X; 76mm, Y;30mm Condenser Manual Abbe Condenser Na 1.25/w.d.-(4x-100x) (built - In) Observation Tubes Binocular, Standard (fn20), Trinocular, Tube Inclination Angel:30®, Trinocular Tube Light Path Selection (camera Observation): 0%:100%, 100%:0%, Interpupillary Distance Adjustment; 48-75mm Dimension (w X D X H) Binocular: 198 (w) X 398 (d) X 386 (h)mm, Trinocular: 198 (w) X 398 (d) X 430 (h)mm Weight Approx. 5.9kg. * 1 Unit Mini Refrigerator Full Range Digital Temperature Control From 5-20®c/frame And Handle, Triple-layered Tinted Glass Door With Stainless Steel Frame And Handle, 2 Durable And Attractive Wooden Shelves, Easy-to-use Touch Control With Led Temperature Display, Cool White Led Interior Lighting, Quiet And Low-vibration Compressor, Class A Rating Low Energy Consumption, Regulated Humidity, 4 Adjustable Feet * Pipetters • 1 Unit Pipette 1;10-100ul Adjustable Volum Pipette • 1 Unit Pipette 2;100-1000ul Single Channel Pipette * Basic Laboratory And Medical Supplies 1 Unit Digital X-ray With Panel Set • Using High Frequency Inverter Technology To Produce, Stable High Voltage Output Can Obtain Good Image Quality; • With Compact Design, It Is To Carry And Work In Different Areas And Locations; • There Are Three Exposure Cotrol Methods; Remote Control, Hand Switch And Interface Button Type; • Fault Self-diagnosis And Self Protection; • With A Flexible Digital Interface,users Can Go Deep Into The Core Programming Control And Can Be Adapted To Different Dr Detec Tors Parameters; • 5kw Portable X-ray Machine • Maximum Power; 5kw • Photography Kv Range; 40-50kv, 40-60kv, 40-80kv, 40-100kv, 40-110kv • Photography Ma Range; 100ma, 80ma, 63ma, 50ma, 32ma • Mas Range; 0.32-300 Mas • Exposure Time Range; 0.01-6.3s • Operating Frequency;>30 Khz • Input Power Type; 220v ± 10%, 50hz/60hz • Input Power Type; 37(l) X 26 (w) X23 (h) Cm220v ± 10%, 50hz/60hz • Weight; 21kg • X-ray Image Stand And Tube Pillar; Radio-graphic Device Movement Along Pillar1400 Mm ±5%; Focus Distance; 130 Cm ± 5%; Fixed Grid Optional; Grid Density 103l/inch, Grid 10;1; Sid 180cm; Size; 15"x18" * 1 Unit Truck Mounted Digital X-ray Machine Sensor; Scintillator; Direct Deposit Csl (cesium Lodide), Active Area; 434 X 430 Mm2, Image Matrix; 3072 X 3072 Pixels, Pixel Pitch; 140 Um Mechanical Dimension; 460 X 460 X 15 Mm3, Weight; 3.96 Kg, Housing Material; Carbon Fiber Imaging Plate, High Strength Aluminum Alloy Body Communication Communication Interface ; Gigabit Ethernet, Acquisition Timer; 2-4s, Exposure Control; F²aed® (full-field Aed), Manual Sync, External Sync Image Quality Spatial Resolution; 3.57 Ip/mm, Mtf; ≤63% (@1 Lp/mm), ≤35% (@2lp/mm), ≤17% (@3 Lp/mm), Dqe (rqa5, 30 Ugy)≤62% (@ 0 Lp/mm), ≤17% (@ 3 Lp/mm), Dynamic Range; > 80 Db Environmental Operating; Natural Cooling Temperature Range; 5-35 ͦc, Humidity Range (non-condensing); 30%-75% Rh, Storage-temperature Range 20-55 ͦc-humidity Range; 10% - 90% Rh Power Power Supply; 100-240 Volts Ac, Frequency; 50/60 Hz, Power Dissipation; 22w (operating), 8w (standby Mode) * 1 Unit Wired Panel 1800 Le * 1 Unit Laptop * 1 Unit Printer Ultrasound * 1 Unit Portable Ultrasound • 12-inch Rotatable Led Monitor (0-30 Deg) Adapt To Different Viewing Angles • Ultra-light And Compact Design, Ideal For Mobile Services • Applications; Urology, Vascular, Small Parts, Pediatrics, Cardiology • Display Modes; B, B/b, 4b, M, B/m • Gray Scale 256 Levels • Multiple Beam Forming Technology (enhance Frame Rate, Improve Image Resolution) • 240mm Max Scanning Depth (depending On The Probe Type) • 2.5mhz - 11 Mhz Probe Frequency (depending On The Probe Type) • Archives Management - Patient Information Management, Patient Images Record, Patient Exam Report • Power Supply - Ac 240v-100v, 50hz-60hz • A Broad Range Of Transducers Available • Software Packages, General Measurement, Ob, Obstetrics, Gyn, Urology, Abdomen, Cardiac B/m Mode, Vascular, Small Parts, Orthopedic, Pediatrics • Standard Configuration Main Unit, 3x Usb Ports, 1 X Probe Connector, C3-a Convex Probe Included, Vga Port, Video Port & Lan Port Ecg Machine * 1 Unit Portable Ecg Machine • 3 Packs Initial Tracing Paper • 3 Channel Ecg Machine With Interpretation, 5.0" Color Tft Lcd Display, Simultaneous 12 Leads Acquisition And 1, 1+1, 3 Channel (manual/auto) Recording With High Resolution Thermal Printer, Manual/auto Working Modes, Use Digital Isolation Technology And Digital Signal Processing, Baseline Stabilization Inspection, Full Alphanumeric Silicon Keyboard,support U Disk And Sd Card Storage, Support Wifi Connection Workstation, Dimension; 65cm X 35cm X 25cm Communication * 2 Units 2-way Radio • Portable Radio And Base Radio (to Be Installed In The Truck) 136-174mhz; 400-490mhz, Output Power; 60w (vhf), 40w (uhf), 200 Programmable Channels, Ctcss/dcs Scan, Scramble Function, Compander To Reduce Noise, Ani Function (dtmf)/ani, 5-tone/ani) Ptt Id, Qhm-03 Multifunctional Microphone With Dtmf • Receiver (etsi En 300 096 Standard Testing And Transmitted (etsi En 300 066 Standard Testing 1 Unit Generator Set (15 Kva) * Generator •brush, Self-excitation, 2 Poles Single-phase, Automatic Voltage Regulator (avr), 60hz, 15kva Max Ac Output, 10kva Rated Ac Output, 220v Rated Ac Voltage, 100%=1.0 Power Factor * Engine Forced Air-cooled, 4 Stroke, Direct Injection, Displacement; 496cc, Max Output; 18hp, Fuel; Diesel Light Fuel (bs- Al Or Equivalent), Fuel Tank Capacity; 1gl, Continuous Operating Hours; 5 Bh, Oil Capacity; 1.65l, Ignition System; Direct-injection, Standing System; Electric, Operating Noise Level (7m); 72db * Dimensions Dimension Lxwxh; 91cm X 52cm X 65cm * Package Dimensions Overall Dimension Lxwxh; 95cm X 56cm X 72cm, Net/cross Weight; 155kg/165kg 1 Unit Other Equipment And Supplies * Split-type Aircon, 1.5 Hp, Non-inverter, * Window Type Aircon, 1.5hp, Non-inverter, * Compact Silent Generator (10kva Gen Set) * Fire Extinguisher Classes Of Fire; Abc, Chimical Efficacy; 12 Years, Warranty; 5 Years, Non-conductor Of Electricity; Yes Non-corrosiver; No, Non-residual; No, Multi-shot; No * 1 Unit Wheelchair • Foldable Lightweight Alluminum Frame, Fixed Armrest & Flip-up Footrest, Foldable Backrest For Easy Storage, Comes With United Handbrakers, Solid Front Castor; 15cm, Solid Back Castor; 30cm, Nylon Seat, Weight; 8kg, Max Load; 100kg * 1 Unit Stretcher • Unfolded Size (lx W X H); 190x64x45cm, Folded Size (lx W X H); 92x19x11cm, Military Style With Bag, Durable Aluminum Constructed Frame With Steel Legs And Reinforced Water-resistance Polyester Fabric, Perfect For Outings, Traveling, Camping, Daycare, Or Lounging, Dimensions Of 75" L, By 25" W And 18" Off The Ground; Holds Up To 250 Poundsa, Carrying Bag Included; Folds Up To 36"l X 7"w X 4"h And Weight 121lbs, Hassle-free Set Up * 1 Unit First Aid Kit Adhesive Bandages In Various Sizes (also Known As Plasters Or Band-aids), Sterile Gauze Pads Or Rolls, Adhesive Tape, Antiseptic Wipe Or Solution, Alcohol Wipes Or Solution, Disposable Gloves, Tweezers, Scissors, Intant Cold Compress, Face Mask, Oral Thermometer, Pain Relievers (such As Acetaminophen Or Ibuprofen), Antihistamine Tablets Or Cream (for Allergic Reactions), Hydrocortisone Cream (for Skin Irritations And Rashes), Burn Ointment * 3 Unit Table * 12 Units Chairs * 1 Unit Canopy 1 Unit Genxpert Machine And Accessories And Cartridges Cepheid Gxiv-4 Tsk With Cartridges 1 Unit Dental Chair With Dental Kits And Accessories (lights And Forceps) Rapid Diagnostic Test * 10 Bxs. Trimera Drug Of Abuse (doa) Rapid Test Range (25's) * 10 Bxs. Trimera Hcg Pregnancy Test (urine And Serum)(25's) * 10 Bxs. Trimerah. Pylori Rapid Test(25's) * 10 Bxs. Trimera Fecal Occult Blood (fob) Rapid Test (25's) * 10 Bxs. Trimera Typhoid. Rapid Test (25's) * 10 Bxs. Trimera Dengue Nsi And Lgg/lgm Combo Rapid Test (25's) * 10 Bxs. Trimera Malaria Rapid Test (25's) * 10 Bxs. Trimera Leptospira Lgg And Lgm Rapid Test (25's) * 10 Bxs. Trimera Syphilis Rapid Test (25's) * 10 Bxs. Trimera Hepotitis B Virus (hbv) Rapid Test Range (25's) * 10 Bxs. Trimera Hepotitis B Surfoce Antigen (hbsag)) Rapid Test (25's) * 10 Bxs. Trimera Hepotitis C Virus (hcv) Rapid Test (25's) * 10 Bxs. Trimera Human Immunodeficiency Virus (hiv) Rapid Test Range (25's) * 10 Bxs. Trimera Cordioc Marker Rapid Test Range (25's) With Technical Assistance Of Company Manpower For 1 Month To Dry Run The Equipments And Train The Mho Personnel With Lgu Rizal Decals, Lto Registered Under Rizal Lgu And Gsis Insurance
Closing Date11 Feb 2025
Tender AmountPHP 13.5 Million (USD 233.8 K)

Environmental Management Bureau Tender

Textile, Apparel and Footwear
Philippines
Details: Description Request For Quotation (rfq) Supply And Delivery Of Personal Protective Equipment Rfq No. Emb-erlsd-2024-11-122-2nd 1. The Department Of Environment And Natural Resources – Environmental Management Bureau (denr-emb) Hereinafter Referred To As The “purchaser” Now Requests For Submission Of Price Quotations For The Procurement Of The Aforesaid Items Described In The Technical Specifications/scope Of Works/terms Of Reference. No. Description Qty Uom Unit Price Abc 1 Field Jacket; -waterproof -easy Transport -anatomic Design -breathable -ventilation 1/2 Zip To Increase Ventilation While Walking - With Denr Logo(embroidery) 9 Pcs 1,275.60 11,480.40 2 Field Shoes; - Resistant Soles For Walking Trails - Waterproof - Breathable Insole | Ankle Collar: 3d Comfortable Mesh - Abrasion Resistance - Sole Design And Spike Clears Mud Easily - Lightweight - Lightweight Eva Foam Midsole That Limits The Impact Of Stones 9 Pcs 4,603.20 41,428.80 3 Field Pants; - Abrasion Resistance - Freedom Of Movement - Quick Drying - Water Repellent - Light, Breathable Fabric - Pockets - 5 Secure With Zip Pocket - With Denr Logo(embroidery) 9 Pcs 2,130.24 19,172.16 4 Field Hat; -lined Bucket Hat Built To Battle Wind, Sun, And Stains. -full Circle Coverage: Bucket Hat Built With Upf 50 Sun Protection, Stain-repellency, And Windbreaker Fabric. Upf 40 Guards Against Skin Damage Using Tight Fabric Construction And Modified Fibers To Block Uva/uvb Rays, Repels Moisture And Resists Stains By Preventing Liquids From Absorbing Into Fast-drying Yarns, So You Stay Clean And Dry In Damp, Messy Conditions. - With Denr Logo(embroidery) 9 Pcs 816.98 7,352.86 5 High Knee Boots; - Waterproof, Slip Resistant, Durable Material, Approximately 80 Cm In Height 5 Pcs 696.00 3,480.00 6 Heavy Duty Industrial Jacket; -durable Anti-flame Jacket With Robust Hidden One-way Metal Zipper And Practical Pockets. -pockets For Ample Storage -sew-on Flame-resistant, Industrially Washable -equipped With A Host Of Features Including Ce-cat Iii -capable Of Blocking Of Uv Rays, And Protection Against Molten Metal Splash -with Hook And Loop Cuffs For A Secure Fit And An External Standards Label For Quick Identification Of Protection Levels -metal Free - With Denr Logo(embroidery) Certification: En Iso 11612 A1+a2 3 Pcs 6,168.34 18,505.01 7 Heavy Duty Safety Shoes; -safety Steel Toe Cap -assorted Sized -electrostatic Discharge Slip Resist -sole Puncture Resistant -certification: En Iso 20345:2011 2 Units 7,854.00 15,708.00 8 Reusable Half Face Mask Respirator -for Construction, General Manufacturing, Mining, Oil & Gas, Pharmaceutical, Primary Metal, Transportation -certification: Approved By Niosh 3 Pcs 1,780.80 5,342.40 9 Hardhat Secure Fit -product Color: White -oshc Tested: Yes -product Type: Cap Style Hard Hat -suspension Type: 4 Point Ratchet -shell Material: Hdpe -features: Pressure Diffusion Technology, Uv Indicator - With Denr Logo 3 Pcs 1,323.34 3,970.01 Note: Sizes Will Be Provided By The End-user Upon Bidder's Receipt Of The Purchase Order (po) 2. A Set Of Technical Requirements Are Provided In Attachment/s. Item/s Listed Under The Purchaser’s Terms Of Reference/s Must Be Complied With On A Pass-fail Basis. Failure To Meet Any One Of The Requirements May Result In Rejection Of The Quotation. The Approved Budget For This Contract Is Php132,331.63. 3. Bidding Procedures Will Be Conducted In Accordance With The Provisions Of The Implementing Rules And Regulations (irr) Of Republic Act 9184. 4. It Is The Intent Of The Purchaser To Evaluate The Bid/quotation On A Per Item Whichever Is Advantageous To The Government. And Award Will Be Made To The Bid/quotation Or Combination Of Quotations Resulting In The Lowest Evaluated Quotation Meeting The Purchaser’s Technical Specifications. 5. Quotations Must Be Delivered At The Address Below Not Later Than Of 02:00 P.m. Of January 17, 2024. Department Of Environment And Natural Resources Environmental Management Bureau Emb Hrd Building Ground Floor, Afmd Denr Compound, Visayas Avenue, Diliman, Quezon City 6. Prices Must Be Quoted In Philippine Peso And Must Include The Unit Price And Total Price, Inclusive Of All Taxes To Be Paid And Other Incidental Cost To The Delivery Site/s If The Contract Is Awarded. 7. Bid/quotation Submission Maybe Typewritten And Must Be Placed In A Sealed Envelope Marked Supply And Delivery Of Personal Protective Equipment Rfq No. Emb-erlsd-2024-11-122 (oss Required) Sealed Bids Must Be Forwarded To Bac Secretariat (administrative, Financial And Management Division) Located At Emb-afmd, Hrd Building Ground Floor Or May Email To Embquotations@gmail.com Submission Must Be Or On Before The Indicated Date At Time. Late Bids And Proposals Above The Abc Shall Be Automatically Disqualified. 8. Bids/quotations Shall Be Valid For Sixty (60) Calendar Days From The Deadline Of Submission Of Bids. 9. The Delivery Period Shall Be Within Sixty (60) Calendar Days From Receipt Of The Purchase Order (po) And/or Job Order (jo). The Supplier Must Inform The Purchaser At Least Three (3) Days Before The Date Of Delivery. The Delivery Will Be Made Only During Working Days And Hours. 10. Delivery Sites: See Delivery Sites Enumerated In The Quotation Form Environmental Management Bureau Hrd Building Ground Floor Denr Compound, Visayas Avenue, Diliman, Quezon City Attention: Afmd-property And General Services Section 11. The Applicable Rate For Late Deliveries Is One Tenth (1/10) Of One (1) Percent Of The Cost Of The Unperformed Portion Of The Contract For Every Day Of Delay. The Maximum Deduction Shall Be Ten Percent (10%) Of The Amount Of Contract. Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Contract Amount, The Purchaser Shall Rescind The Contract Without Prejudice To Other Courses Of Action And Remedies Open To It. 12. The Purchaser Reserves The Right To Accept Or Reject Any Quotation, And To Annul The Bidding/shopping Process Or Reject All Quotations At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder/bidders. The Purchaser Also Reserves The Right To Waive Minor Deviations/defects Or Infirmities Therein. A Minor Deviation/defect Or Infirmity Is One That Does Not Materially Affect The Overall Functionality Of The Material And The Capability Of The Supplier To Perform The Contract. 13. Participating Service Provider/s Must Abide By The Existing Health, Safety, Environment, Quality And Other Related Laws And Procedures As Prescribed By The Philippine Government. 14. Documents To Submit: A) Quotation Form With Technical Specifications. B) Mayor’s/business Permit. C) Philgeps Registration Number/proof Of Philgeps Registration D) Tax Clearance Only (not Itr) E) Oss-omnibus Sworn Statement (notarized) Engr. Rodney V. Diaz Oic-property & General Services Section Attachment 1 Republic Of The Philippines Department Of Environment And Natural Resources Environmental Management Bureau Technical Specifications Item No. 1 Supply And Delivery Of Personal Protective Equipment Quantity: Country Of Origin: Brand/model: All Items Listed Under The Purchasers’ Specifications Must Be Complied On A Pass-fail Basis. Failure To Meet Any One Of The Requirements May Result To Rejection. Qty Uom Purchaser’s Specifications Bidder’s Specifications 1 Set Field Jacket; -waterproof -easy Transport -anatomic Design -breathable -ventilation 1/2 Zip To Increase Ventilation While Walking - With Denr Logo(embroidery) 21 Pcs Field Shoes; - Resistant Soles For Walking Trails - Waterproof - Breathable Insole | Ankle Collar: 3d Comfortable Mesh - Abrasion Resistance - Sole Design And Spike Clears Mud Easily - Lightweight - Lightweight Eva Foam Midsole That Limits The Impact Of Stones 5 Pcs Field Pants; - Abrasion Resistance - Freedom Of Movement - Quick Drying - Water Repellent - Light, Breathable Fabric - Pockets - 5 Secure With Zip Pocket - With Denr Logo(embroidery) 5 Units Field Hat; -lined Bucket Hat Built To Battle Wind, Sun, And Stains. -full Circle Coverage: Bucket Hat Built With Upf 50 Sun Protection, Stain-repellency, And Windbreaker Fabric. Upf 40 Guards Against Skin Damage Using Tight Fabric Construction And Modified Fibers To Block Uva/uvb Rays, Repels Moisture And Resists Stains By Preventing Liquids From Absorbing Into Fast-drying Yarns, So You Stay Clean And Dry In Damp, Messy Conditions. - With Denr Logo(embroidery) 10 Units High Knee Boots; - Waterproof, Slip Resistant, Durable Material, Approximately 80 Cm In Height 2 Units Heavy Duty Industrial Jacket; -durable Anti-flame Jacket With Robust Hidden One-way Metal Zipper And Practical Pockets. -pockets For Ample Storage -sew-on Flame-resistant, Industrially Washable -equipped With A Host Of Features Including Ce-cat Iii -capable Of Blocking Of Uv Rays, And Protection Against Molten Metal Splash -with Hook And Loop Cuffs For A Secure Fit And An External Standards Label For Quick Identification Of Protection Levels -metal Free - With Denr Logo(embroidery) Certification: En Iso 11612 A1+a2 2 Units Heavy Duty Safety Shoes; -safety Steel Toe Cap -assorted Sized -electrostatic Discharge Slip Resist -sole Puncture Resistant -certification: En Iso 20345:2011 Reusable Half Face Mask Respirator -for Construction, General Manufacturing, Mining, Oil & Gas, Pharmaceutical, Primary Metal, Transportation -certification: Approved By Niosh Hardhat Secure Fit -product Color: White -oshc Tested: Yes -product Type: Cap Style Hard Hat -suspension Type: 4 Point Ratchet -shell Material: Hdpe -features: Pressure Diffusion Technology, Uv Indicator - With Denr Logo Note: Sizes Will Be Provided By The End-user Upon Bidder's Receipt Of The Purchase Order (po) Name Of Company : _________________________________ Postal Address : _________________________________ Email Address : _________________________________ Telephone & Fax No. : _________________________________ Signature Over Printed Name : _________________________________ Designation : _________________________________ Other Requirements 1. Quotation Submission Requirements - Supplier Must Submit A Duly Accomplished And Signed Price Quotation, And Supplier’s Line By Line Technical Specifications Compliance. - Supplier’s Must Accomplish/fill All Required Pages To Facilitate Documentation - Supplier Must Be Philgeps Registered. - Business Permit/license Permit - Failure To Follow The Above Requirements May Result To Outright Rejection Of Submitted Quotation/s. 2. Evaluation And Awarding Of Quotation - The Purchaser Will Evaluate And Compare The Offers, Which Have Been Determined As Responsive Pursuant To The Completeness Of The Purchaser Requirements - Compliance To The Technical Specifications - Awards Shall Be Made To The Lowest Evaluated And Responsive Quotation. - Submission Of Requirements Containing False Information Or Falsified Documents That Contain False Information Or Concealment Of Such Information In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Procurement Process May Result To Blacklisting Guidelines As Provided In The Irr Of Ra 9184. 3. Terms Of Payment - 100% Of The Contract Price Will Be Paid Upon Verification/inspection And Acceptance Of The Services In Compliance To Existing Government Auditing And Accounting Procedures. Quotation Form Date: ____________________ Attention: Afmd-property And General Services Section Environmental Management Bureau Hrd Building Ground Floor, Afmd Denr Compound, Visayas Avenue, Diliman, Quezon City 1) Having Examined The Subject Request For Quotation (rfq) Including The Technical Specifications, We, The Undersigned Offer To Supply And Deliver The Following: No. Description Delivery Site Qty Uom Unit Price Total Price Supply And Delivery Of Personal Protective Equipment Environmental Management Bureau, Hrd Building Ground Floor, Afmd Denr Compound, Visayas Avenue, Diliman, Quezon City 1 Field Jacket; -waterproof -easy Transport -anatomic Design -breathable -ventilation 1/2 Zip To Increase Ventilation While Walking - With Denr Logo(embroidery) 1 Set 2 Field Shoes; - Resistant Soles For Walking Trails - Waterproof - Breathable Insole | Ankle Collar: 3d Comfortable Mesh - Abrasion Resistance - Sole Design And Spike Clears Mud Easily - Lightweight - Lightweight Eva Foam Midsole That Limits The Impact Of Stones 21 Pcs 3 Field Pants; - Abrasion Resistance - Freedom Of Movement - Quick Drying - Water Repellent - Light, Breathable Fabric - Pockets - 5 Secure With Zip Pocket - With Denr Logo(embroidery) 5 Pcs 4 Field Hat; -lined Bucket Hat Built To Battle Wind, Sun, And Stains. -full Circle Coverage: Bucket Hat Built With Upf 50 Sun Protection, Stain-repellency, And Windbreaker Fabric. Upf 40 Guards Against Skin Damage Using Tight Fabric Construction And Modified Fibers To Block Uva/uvb Rays, Repels Moisture And Resists Stains By Preventing Liquids From Absorbing Into Fast-drying Yarns, So You Stay Clean And Dry In Damp, Messy Conditions. - With Denr Logo(embroidery) 5 Units 5 High Knee Boots; - Waterproof, Slip Resistant, Durable Material, Approximately 80 Cm In Height 10 Units 6 Heavy Duty Industrial Jacket; -durable Anti-flame Jacket With Robust Hidden One-way Metal Zipper And Practical Pockets. -pockets For Ample Storage -sew-on Flame-resistant, Industrially Washable -equipped With A Host Of Features Including Ce-cat Iii -capable Of Blocking Of Uv Rays, And Protection Against Molten Metal Splash -with Hook And Loop Cuffs For A Secure Fit And An External Standards Label For Quick Identification Of Protection Levels -metal Free - With Denr Logo(embroidery) Certification: En Iso 11612 A1+a2 2 Units 7 Heavy Duty Safety Shoes; -safety Steel Toe Cap -assorted Sized -electrostatic Discharge Slip Resist -sole Puncture Resistant -certification: En Iso 20345:2011 2 Units Reusable Half Face Mask Respirator -for Construction, General Manufacturing, Mining, Oil & Gas, Pharmaceutical, Primary Metal, Transportation -certification: Approved By Niosh Hardhat Secure Fit -product Color: White -oshc Tested: Yes -product Type: Cap Style Hard Hat -suspension Type: 4 Point Ratchet -shell Material: Hdpe -features: Pressure Diffusion Technology, Uv Indicator - With Denr Logo Note: Sizes Will Be Provided By The End-user Upon Bidder's Receipt Of The Purchase Order (po) 2) We Undertake, If Our Quotation Or Bid Is Accepted, To Deliver The Above Goods Within The Sixty (60) Calendar Day Delivery Period From Receipt Purchase Order (po) Or Job Order (jo). 3) We Agree To Abide By This Quotation/bid For A Period Of Sixty (60) Days After The Deadline Of Submission Specified In The Rfq. 4) We Understand That Payment For Items Delivered Will Be Made To The Winning Supplier After The Inspection And Acceptance Of Goods Delivered. Name Of Company : _________________________________ Postal Address : _________________________________ Email Address : _________________________________ Telephone & Fax No. : _________________________________ Signature Over Printed Name : _________________________________ Designation : _________________________________ Omnibus Sworn Statement (revised) [shall Be Submitted With The Bid] _________________________________________________________________________ Republic Of The Philippines) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct. 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted. 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree. [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree. [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ________ And His/her Community Tax Certificate No. _______ Issued On ____ At ______. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____
Closing Date17 Jan 2025
Tender AmountPHP 132.3 K (USD 2.2 K)
2121-2130 of 2180 archived Tenders