Fiber Tenders

Fiber Tenders

BICOL UNIVERSITY POLANGUI Tender

Civil And Construction...+1Building Construction
Philippines
Closing Soon5 Nov 2024
Tender AmountPHP 380 K (USD 6.5 K)
Details: Description Provisions Of Labor And Materials For The Repair Of Damaged Ceilings And Partition Of Speech Laboratory Room Located At Salceda Building, Bicol University Polangui, Polangui Albay Items Of Work Included: This Program Of Work Covers The Repair Works Of Damaged Ceiling And Partition Of Speech Laboratory Room At Salceda Building. I. General Requirements: 1 Lot This Item Of Work Includes The Fabrication And Installation Of Project Sign Boards, Temporary Utilities, Stock Room And Enclosure, And The Provisions For The Construction Safety And Health Program. This Includes 1.5 Months Electrical Constructions Ii. Site Works 1 Lot This Item Of Work Includes The Following Site Works: A. Clearing And Cleaning Of Site Before And After Construction. 1 Lot B. Dismantling Of Existing Ceiling, Ceiling Joist, And Hangers. 75.33 Sq.m. C. Dismantling Of Existing Wires, And 1 Lot D. Hauling/disposal Of Debris And Storage Of Waste Of Waste Materials 1 Lot Also Included Is The Equipment Rental Of One (1) Unit Cutting Tools And Blade, And One (1) Unit Hauling Truck Needed To Complete The Said Item Of Work. Confer With The Supply Officer As To The Designated Area Where The Waste Materials Are To Be Stockpiled. The Contractor Shall Submit The Waste Material Prior To Demobilization. Iii. Ceiling Works 75.33 Sq.m. This Item Or Works Includes The Furnishing And Installation Of The Following: Cf-1 Speech Laboratory Room Ceiling 75.33 Sq.m. This Item Of Work Includes The Furnishing And Installation Of ¼” Thk. Marine Plywood On 2”x2”x12’ Good Lumber Ceiling Joist Spaced @ 600mm X 600mm On Center Both Ways. Use Screws And Assorted Cw Nails For Anchorage Of Joints And 2”x2”x12’ Concrete Wall Perimeter Anchored By 10mm Dia X 2” Expansion Bolt W/ Shield And Concrete Nails. Use 2”x2”x12’ Good Lumber As Hangers. Use Welding Rod, Level Hose, Nylon And Other Miscellaneous Hardware Items Necessary For The Completion Of Work. Also Included Is The Equipment Rental Of One (1) Unit Drill Tool & Drill Bits And One (1) Unit Cutting Tools & Blade Needed To Finish The Said Item Of Work. All Materials Shall Be Approved High Quality. Please Refer To The Plan For Complete Details. Iv. Painting Works 103.87 Sq.m. This Item Of Work Includes The Painting Of The Following Areas: Cf-1 75.33 Sq.m. Partitions 28.54 Sq.m. Use Of Falt Latex Undercoat (1coat), Patching Compound, Mesh Tape, (2”x 75m) Semi-gloss Acrylic Topcoat (2 Coats) To Ceiling Fiber Cement. Use Flat Enamel (1 Coat), Quick Dry Enamel (2coats), Glazing Putty, Tinting Color To Wood Surfaces. This Item Of Work Includes The Use Of Sandpaper, Paint Rollers, Brushes, Tray, Rags, Newspapers And Other Miscellaneous Item To Finish The Painting Works. The Painting Contractors Shall Supply All Labor, Tool And Equipment Necessary And Shall Perform All Painting And Finishing Works As Shown In The Schedule Of Painting And Other Surfaces To Render Ready To Use. Painting Materials Shall Be Stored In One Placed In The Building To Be Kept Neat And Clean. Before Any Painting Is Done All Surfaces Shall Be Cleaned, Smoothed And Free From Dust. Dirt, Grease, Mortar, Rust And Other Foreign Substances And All Parts Where Paint Remover Has Been Used Shall Be Washed Off With Paint Or Laquer Thinner. All Paints Shall Be Spread Evenly And Carefully. No Painting Shall Be Done On Outside Work Extremely Cold, Frosty, Foggy Or Damp Weather. All Materials Shall Be Approved High Quality. V. Partitions Works 14.27 Sq.m. This Item Includes The Furnishing And Installation Of Partitions: ¼”thk Marine Plywood 17.00pcs 2”x1 ½” X 10’ Good Lumber 38.00 Pcs 3/16”x2”x4” G.i. Tubular 1.00 Pc Aluminum Track 38mmx41mmx2mmx2m 3.00 Pcs Heavy Duty Silent 27mm Roller (w/stoppers, Floor Guide And Screws)12.00 Pcs ¾”x2m Aluminum U Channel 3.00 Pcs 3”x3” Stainless Steel Hinges 30.00 Pcs Assorted Cw Nails 3.00kgs Concrete Nails 1.00 Kg Screws 1.00 Box 10mm Dia X 2” Expansion Bolt W/shield 14.00 Pcs 4” Chain Bolt 2.00 Pcs 4” Foot Bolt 2.00 Pcs Miscellaneous Items And Other Consumables 1.00 Lot This Item Of Work Includes The Equipment Rental Of One (1) Electric Grinder, One (1) Unit Drill Tools & Drill Bits, And One (1) Unit Cutting Tools & Blade Needed To Finish The Said Item Of Work. All Materials Shall Be Approved High Quality. Please Refer To The Plan For Complete Details. Vi. Electrical Works 1 Lot This Item Work Includes Supplies And Installations Of The Following Electrical Fixtures And Materials: Class Rooms Electrical Fixtures Wires, Cables, Conduits And Accessories 3.5 Mm2 Thhn Wire 1.00 Box Conduits And Accessories 20mm Dia. Pvc Conduit 10.00pcs 20mm Dia. Flexible Hose 6.00 Meters Cable Tie (assorted Sizes) 1.00 Lot Tie Wire 2.0 Kgs Pvc C-clamps 1.00 Lot Expansion Bolts, Tox With Black Screw 1.00 Lot Electrical Tape (big) 5.00 Rolls 2”x4” Utility Box 2.00 Pcs Junction Box With Cover 13.00 Pcs Miscellaneous & Consumable (hanger & Support) 1.00 Lot Wirings Devices Two Gang Switch 2 Sets Ceiling Fan 3 Sets Lighting Fixtures 2x14w Troffer Type T8 Led With Mirrorrized 2 Sets Reflector Same Specs As Existing Wires Must Be Color Coded. Use Line 1-red, Line 2- Yellow, Line 3-blue, Neutral- Black/white, Grounding-green Wire Must Be Phelpdogde Or Approved Equivalent. All Items Must Be Brand New And Approved Type. See Electrical Plans For Directives. Vii. Scaffoldings This Item Of Work Includes The Rental Of G.i. Pipe H-frame For Scaffolding. Also Included Is The Furnishing And Installation Of 1 Pc ½” Thk Phenolic Board, 80bd.ft. Of 2”x3”x12’ Coco Lumber, And 50 Bd.ft. Of 2”x2”x12’coco Lumber, G.i. Tie Wire #16 And Assorted Cw Nails For Scaffoldings And Bracing To Complete The Said Item Of Work. Location : Bicol University Polangui, Polangui, Albay Delivery Period : 60 Days Provision Of Labor And Materials For The Repair Of Damaged Ceiling And Partition Of Bu Polangui Speech Laboratory The Bicol University Polangui, Through The Corporate Budget For The Contract Approved By The Board Of Regents Intends To Apply The Sum Of Three Hundred Eighty Thousand & 00/100 Pesos Only (php380,000.00) Being The Approved Budget For The Contract To Payments For The Contract: Provision Of Labor And Materials For The Repair Of Damaged Ceiling And Partition Of Bu Polangui Speech Laboratory. The Bicol University Polangui Now Requests Proposals From Bonafide Suppliers To Submit Proposals For The Provision Of Labor And Materials For The Repair Of Damaged Ceiling And Partition Of Bu Polangui Speech Laboratory. Procurement Will Be Conducted Through Negotiated Procurement– An Alternative Methods Of Procurement Specified And Prescribed Under Rule Xvi - Alternative Modes Of Procurement, Section 53.9 – Negotiated Procurement (small Value Procurement), Of The Implementing Rules And Regulations Part-a (irr-a) Of Republic Act No. 9184, Otherwise Known As Government Procurement Reform Act. Supplier Shall Submit Proposals On Or Before November 6, 2024, 12:00nn To The Bac Secretariat, Bicol University Polangui, Polangui, Albay. Bicol University Polangui Reserves The Right To Reject Any Or All The Bids, Waive Any Defect Or Informality Therein, Accept The Bid And Award The Contract To The Most Advantageous Offer To The Bicol University Polangui, For And In Behalf Of The Project. Bicol University Polangui Assumes No Responsibility To Compensate Or Indemnify The Bidder For Any Expense Or Loss That May Be Incurred For The Preparation Of Bids, Nor Does It Guarantee That An Award Will Be Made. For Further Information, Please Contact The Bac Secretariat Office, Bicol University Polangui, Polangui, Albay 4506, And Contact No.: 09104618693, Bac-polangui@bicol-u.edu.ph. Approved By: Prof. Artemio Jerome S. Rivera, Jr. Bac Chairman Transaction Reference#: Lr_2024_10_0045

City Of Lipa Tender

Electrical Goods and Equipments...+1Electrical and Electronics
Philippines
Closing Soon8 Nov 2024
Tender AmountPHP 461.2 K (USD 7.9 K)
Details: Description 1.the Batangas State University (batstate U) Through The Bids And Awards Committee Invites Interested Firms/supplier To Submit Quotation For The Project "procurement Of Hardware/construction Supplies And Other Supplies" With An Approved Budget For The Contract (abc) Four Hundred Sixty-one Thousand Two Hundred Ninety-five Pesos Only (php 461,295.00). Quotation Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening. Item No. Qty Description Total 1 25 Piece 2" Pvc Electrical Pipe Pvc Electrical Pipe -2" Diameter -3 Meters Long 7,500.00 2 50 Set 2-gang Universal Outlet With Plate 3-material: Polycarbonate, And Protected From Uv And Fading Flame Retardant And High Heat Resistance (up To 120°c) Current: 15a Voltage: 250v~ 9,250.00 3 50 Unit All Purpose Grab Adhesive Size: 300g Used For Construction: Wood, Structural Flooring Panels, Particle Board, Masonry, Aluminum, Galvanized Iron, Steel, Concrete And Fibrous Cement Sheet. Styrene Safe Water Resistant 11,000.00 4 6 Piece All Purpose Adhesive 100g For Electrical Works 480.00 5 10 Piece Angle Bar 6m X 1"x 1" X 2mm Thick 3,500.00 6 10 Piece Angle Bar Steel Size: 1 1/2" X 2.5 Mm X 6 Meters 6,450.00 7 1020 Piece Black Screw 1 1/2" Black Finish Needle Point For Wood Self-tapping Also Called Black Screw Or Drywall Screw Or Grabber Screw Or Gypsum Screw 1 1/2 Inch 1,020.00 8 2 Box Black Screw 1" Material: Steel, Black Finish, Needle Point, For Wood, Self-tapping 250pcs/box 236.00 9 7 Piece Cable Holder And Organizer 28mm Flexible Spiral Length = 1 Meter 3,500.00 10 5 Pack Cable Tie 3.6 X 200mm Material: Nylon66 Color: White 100pcs/pack 560.00 11 2 Pack Cable Tie 4.6 X 300mm Material: Nylon66 Color: White 100pcs/pack 470.00 12 1 Pack Cable Tie 9.0 X 500mm Material: Nylon66 Color: White 100pcs/pack 1,065.00 13 5 Kilogram Common Wire Nail 1" For Wood Size : 1" 525.00 14 5 Kilogram Common Wire Nail 2" For Wood Size : 2" 525.00 15 5 Kilogram Common Wire Nail 3" For Wood Size : 3" 525.00 16 5 Kilogram Common Wire Nail 4" For Wood Size : 4" 525.00 17 5 Kilogram Concrete Nail 1 1/2" High Quality Power Concrete Nails Size : 1 1/2" 550.00 18 5 Kilogram Concrete Nail 1" High Quality Power Concrete Nails Size : 1" 550.00 19 5 Kilogram Concrete Nail 3" High Quality Power Concrete Nails Size : 3" 525.00 20 3 Roll Construction Blue Sack/ Sakulin Size: 8 Ft X 100 M Per Roll. Double Sided: Orange And Blue Use: Cover The Sun And Rain, Such As Furniture Covers, Floors, Construction Projects, Product Covers, Car Covers, Tent Covers, Awnings. Waterproof Coating: Real Canvas Double-sided Coating, Double-sided Waterproof. Pe Material Tarpaulin, Thick And Durable 11,700.00 21 100 Piece Cutting Disks Diameter: 105mm Bore Size: 16mm Thickness: 1mm Material To Be Cut: Inox & Metal Working Material: Stainless Steel, Steel 10,000.00 22 20 Piece Deformed Rebar 10mm Diameter (g33) 6m Length 3,200.00 23 4 Piece Diamond Cutting Disc Diameter Mm: 125 Bore Diameter Mm: 22.23 Cutting Width Mm: 2.0 Segment Height Mm: 10 Materials That Can Be Processed (detail): -reinforced Concrete -concrete -tile Adhesive -tile -marble -sheet Steel 2,115.00 24 2 Piece Diamond Glass Cutter Iron Body Auto Oil Feed Cutter With 1pcs Oil Suction Pipe Length:178mm 800.00 25 10 Piece Door Buckle Size: 3” Material: Stainless Steel Finish: Satin Corrosion Proof Non Handed Heavy Duty 2,200.00 26 10 Set Door Knob Set Round Door Knob,antique Brass Push Lock Backset: 60mm Door Thickness Of Panel Door: 35-50mm Finish: Stainless Steel (anti Rust) No. Of Keys: 3 Nickel Plated Brass Keys, Heavy 9,800.00 27 1 Pack Drill Bit 5/32" Hss-co Metal Drill Bit (cobalt 5%)- 5/32" 5pcs/pack 500.00 28 4 Set Drill Bit Set Material: Steel /tungsten 17pcs/set With Case Includes 3/4/5/6mm Metal Wood Drill Bits 4/5/6/8mm Concrete Drill Bits Assorted Screw Bits Magnetic Bit Holder With Case 3,600.00 29 1 Pack Drill Bit 3/16" Hss-co Metal Drill Bit (cobalt 5%)- 3/16" 5pcs/pack 645.00 30 4 Gallon Elastomeric Waterproofing Paint Color: Red 4,440.00 31 8 Gallon Elastomeric Waterproofing Paint Color: Smoke Gray 6,560.00 32 8 Gallon Elastomeric Waterproofing Paint Color: Tulle White 6,560.00 33 50 Piece Electrical Tape Size 0.16mmx0.19mmx16m(min) Black Temperature Resistance: -60 Degrees To 150 Degrees For Electrical Works 2,250.00 34 2 Pair Electrical Gloves Anti-skid, High Temperature Protective Gloves Nitrile Palm Coating Nylon Stretch Liner Knit Wrist Cuff Style Washable 1,000.00 35 4 Liter Enamel Paint Color: Flat Black Applicable For Metal And Wood 1,000.00 36 20 Piece Face Mask N95 Respirator N95 Face Mask 1,120.00 37 10 Piece Fiber Cement Board Fiber Cement Board 1/4x 4ftx 8ft 6,500.00 38 5 Kilogram Finishing Nail 1 1/2" For Wood, Finishing Size : 1 1/2" 550.00 39 5 Kilogram Finishing Nail 1" For Wood, Finishing Size : 1" 550.00 40 1 Roll Flat Cord No.16 Awg16, Duplex Wire, 1.25mm2 X 2c, 6/2 60c 300v, Pure Copper. White 4,704.00 41 10 Piece Foot Bolt Bolt Length: 6 Inch Finish: Zinc Plated Material: Zinc -suitable For: Cabinets And Doors -step On Release Lever To Retract Bolt -deadlocking Latch Bolt 3,000.00 42 5 Kilogram G.i Wire H.g. I Wire # 16 Rust Resistant Flexible High Tensile Strength 475.00 43 20 Bag Gravel Gravel 3/4 Minimum 5kgs Per Bag 1,800.00 44 6 Piece Junction Pull Box With Cover Material: Steel 6 X 6" 3,000.00 45 250 Piece Led Flourescent Light T8, 16w 75,000.00 46 137 Piece Led Light Bulb 7w Led Light 6500k Daylight 610lm Brightness 15,000hrs Lifespan 200-degree Beam Angle E27 Compatibility 23,290.00 47 50 Piece Led Light Bulb 7w Led Light 6500k Warmwhite 610lm Brightness 15,000hrs Lifespan 200-degree Beam Angle E27 Compatibility 8,500.00 48 100 Piece Led Tube Light 18w 18-watt Led Fluorescent Lamp 1800 Lumens 6500k Daylight Minimum Of 20,000 Hours 100v -277v T8 Model 26,000.00 49 4 Gallon Lacquer Thinner Laquer Thinner, 4l Per Container/gallon 3,120.00 50 8 Gallon Latex Acrylic Paint (white) Gloss Latex White Acrylic Latex Paint At Least 4 Liters Per Container/gallon 7,560.00 51 10 Piece Lavatory Faucet Stainless Steel Basin Faucet Body Material : Stainless Steel Sus 304 Dimension : L:atleast 100mm W: Atleast 45mm H: Atleast 165mm 7,000.00 52 20 Piece Lavatory Flexible Hose Material: Stainless Steel (sus304) Size: 1/2 Inch X 1/2 Inch Lenght: 40 Cm Specification: Stainless Steel Flexible Hose 1/2 Inch 2,400.00 53 50 Piece Male Plug 10a 220v Regular Male Plug, White 1,100.00 54 1 Piece Marine Plywood 3/4" Marine Plywood 3/4" 4ft X 8ft 2,000.00 55 1 Box Masonry Drill Bit 3/16" Masonry Drill Bit For Concrete 3/16" (10pcs/box) 340.00 56 2 Piece Masonry Hammer Drill Bit Sds Plus 12dia X 310mm High Quality Tct Tip Chrome Alloy Steel Body Sds Plus Shank, Double Flute 340.00 57 1 Piece Masonry Hammer Drill Bit Sds Plus 12dia X 450mm High Quality Tct Tip Chrome Alloy Steel Body Sds Plus Shank, Double Flute 205.00 58 50 Piece Metal Cutting Disc Diameter: 105mm Bore Size: 16mm Thickness: 6mm Material To Be Cut: Inox & Metal Working Material: Stainless Steel, Steel 3,250.00 59 4 Gallon Metal Primer Gray Oxide Metal Primer, At Least 4l Per Container/gallon 5,400.00 60 2 Box Metal Screw Galvanized Metal Screw #6 Self-tapping Flat Screw 100pcs Per Box 120.00 61 20 Piece Ppr Coupling Size : 20mm Finish : Matte Pn 20 500.00 62 20 Piece Ppr Coupling Size : 25mm Finish : Matte Pn 20 800.00 63 10 Piece Ppr Elbow With Threaded Size : 20mmx20mm Finish : Matte Pn 20 850.00 64 10 Piece Ppr Elbow With Threaded Size : 25mmx25mm Finish : Matte Pn 20 1,450.00 65 10 Piece Ppr Female Adapter Size : 20mm Finish : Matte Pn 20 1,400.00 66 5 Piece Ppr Gate Valve 1/2” Size : 20mm Finish : Matte Pn 20 1,250.00 67 5 Piece Ppr Gate Valve ¾” Size : 25mm Finish : Matte Pn 20 2,950.00 68 10 Piece Ppr Pipe 3/4 “ Size : 25mmx 4m Finish : Matte Pn 20 6,300.00 69 10 Piece Ppr Pipe ½ “ Size : 20mmx 4m Finish : Matte Pn 20 2,600.00 70 293 Piece Pvc Moulding 3/4" Pvc Moulding 3/4" 20mm X 16mm X 8ft Higher Insulation Resistance Higher Dielectric Strength Non-flammable Rust-proof 26,370.00 71 10 Piece Paint Brush Paint Brush 1" 400.00 72 20 Piece Paint Brush Paint Brush 2" 1,100.00 73 10 Piece Paint Brush Paint Brush 3" 900.00 74 10 Piece Paint Roller Brush With Handle 4 Inches 1,500.00 75 5 Piece Paint Roller Brush With Handle Paint Roller Brush With Handle, 6" 850.00 76 4 Gallon Paint Thinner For Thin Oil-based Paints Size : At Least 4l (galloon)/ Container 2,480.00 77 20 Piece Paint Brush Paint Brush 4" 2,500.00 78 25 Piece Paint Roller Refill 4 Inches 2,100.00 79 10 Piece Paint Roller Refill Paint Roller Refill, 6" 1,060.00 80 1 Piece Plastering Trowel W/ Teeth Plastering Trowel(plastic Handle) Stainless Steel Size:280x120mm Teeth:10*10mm Two-component Plastic Handle 400.00 81 2 Set Polyester Body Filler With Hardener Hardener Polyester Body Filler Impact & Shock Resistant - 1l 500.00 82 20 Piece Recessed Square Downlight White Finish Matte Material Plastic Size 170x170mm Application Indoor 11,000.00 83 20 Piece Rubber Tape Self Fusing Rubber Tape Size: At Least 0.8mm X 19mm X 8 Meters For Electrical Insulation, Cable Splicing And Terminating 3,400.00 84 3 Gallon Rust Converter At Least 4 Liters Per Container/gallon 4,380.00 85 24 Pair Safety Gloves Size: Free Size Gauge: 10 Durable Side Seam Polyurethane Palm Coated Material: Knitted Cotton 960.00 86 2 Piece Safety Googles Safety Goggles Eye Protection For Welding Material: Poly Carbonate Iht Dark Shade: 10 Use For Welding 300.00 87 1 Piece Safety Harness Harness( 2pieces) Performance : Maximum Free Fall Distance: No Greater Than 6 Feet (1.8m) Maximum Arresting Force: 1,800 Lbs. (8 Kn) Capacity: Harness Only: 2.3 Lbs. (1.0 Kg) Approximate Weight: Harness With Side D-rings: Add 0.6 Lb. (0.3 Kg) Harness With Bad Pad Or Belt: Add 1lb. (.45kg) Materials: D- Rings: Zinc Plated Steel, Tensile Strenght=5, 000 Lbs(22kn) D- Ring Pad: Polyester 1-3/4 In. (45mm): Tensile Strenght = 6,000 Lb (27kn) Thread: High Strenght Polyester Labels: Vinyl Size: Large 4,200.00 88 7 Dozen Safety Rubber Gloves For Construction Safety Rubber Gloves 1 Dozen 1,960.00 89 20 Bag Sand Sand S1 Minimum 5kgs Per Bag 1,700.00 90 5 Set Sanitary Bidet Set Application: Wall Installation Finish: Matte Material Used: Stainless 304 Hose- 1.5 M Bidet Head -12.8 Cmx5.8 Cmx 2.5cm 5,500.00 91 20 Bottle Spray Paint Mirror Chrome Spray Paint Paint Finish:gloss Paint Features: Mirror-finish Formulation: Spray Paint Volume: 200ml/bottle 6,800.00 92 11 Kilogram Stainless Welding Rod Stainless Steel Welding Rod Nss-308 3/32" (2.5mm) 1kg Per Pack 8,580.00 93 25 Piece Surface Mounted Outlet 4gang 10a 250v Polycarbonate Material High Impact Resistance Flame Retardant High Heat Resistance Ac, Surface Mounted Outlet , White 2,750.00 94 200 Piece Surface Mounted Utility Box Surface Type Pvc Utility Box 8,000.00 95 2 Box Thhn Wire 5.5 Sq.m 150meters Lead-free Conductor Is Made From Copper With 100% Conductivity Pvc Insulation - Lead Free And Flame Retardant, Heat, Moisture, Gasoline And Oil Resistant Nylon Jacket - Oil, Chemical And Abrasion Resistant, Tough And Easy To Pull In Conduit Maximum Number Of Conductors In A 15mm Conduit: 9 13,000.00 96 2 Roll Thhn Wire 3.5mm2 (black) 150 Meters Lead-free Conductor Is Made From Copper With 100% Conductivity Pvc Insulation - Lead Free And Flame Retardant, Heat, Moisture, Gasoline And Oil Resistant Nylon Jacket - Oil, Chemical And Abrasion Resistant, Tough And Easy To Pull In Conduit Maximum Number Of Conductors In A 15mm Conduit: 9 9,000.00 97 10 Piece Teflon Tape 1/2in, Water Pipe Thread Seal Tape 120.00 98 10 Piece Three Way Angle Valve Application: Wall Installation Finish : Matte Material : Stainless Steel 304 Size: 1/2mm X 1/2mm X 1/2mm 4,300.00 99 4 Liter Tinting Color Oil Tinting Colors Black - 1l 1,360.00 100 5 Box Tox Plastic Tox 5mm 40 Per Box 125.00 101 10 Piece Two Way Angle Valve Application: Wall Installation Finish : Matte Material : Stainless Steel 304 Size: 1/2mm X 1/2mm X 1/2mm 3,500.00 102 3 Piece Tylon Tape Measure L8m/26ft, W1in Heavy Duty Tylon Coated Blade, Anti-glare Soft Touch Case Corrosion-resistant Tru-zero End Hook For Accurate Measurement 1,350.00 103 2 Pair Welding Leather Gloves Size: 10" Anti-skid And Abrasion-resistant Cow Split Leather Gloves Full Palm, Full Lining 800.00 104 25 Box Welding Rod Welding Rod 6013 3/32" (2.5mm) 2.5kg Per Box 7,500.00 Note: Kindly Indicate The Brand/pictures/brochures On Your Quotation. 2.philgeps Registration Certificate And Other Business Permits Shall Be Attached Upon Submission Of The Quotation. 3.the Quotation Must Be Submitted (can Also Be Send Thru Fax And Email At The Contact Details Listed Below) Or To The Batangas State University Lipa Brgy. Marawoy, Lipa City Batangas 4217 And Shall Be Received By The Committee On Or Before 5:00 Pm Of November 07, 2024. E-mail : Procurement.lipa@g.batstate-u.edu.ph 4.the Bsu Reserves The Right To Reject Any Or All Quotations And/or Proposals And Waive Any Formalities/informalities Therein And To Accept Such Bids It May Consider As Most Advantageous To The Agency And To The Government. Batstate U Neither Assumes Any Obligation For Whatsoever Losses That May Be Incurred In The Preparation Of Bids, Nor Does It Guarantee That An Award Will Be Made. Ms. Evangeline A. Garcia Head, Procurement Office Batangas State University Lipa Brgy. Marawoy, Lipa City Batangas 4217 (043)779-8400 Loc 3105/0917-129-3813

Department Of Education Division Of Legazpi City Tender

Food Products
Philippines
Closing Soon7 Nov 2024
Tender AmountPHP 4 Million (USD 70.4 K)
Details: Description Item Description Quantity Unit Approved Budget Of The Contract Price Compliance Remarks Quantity Unit Price Total Price Yes No Supply And Delivery Of Pasteurized Carabao's Milk As Requirement For The School-based Feeding Program (sbfp)-milk Component For Sy 2024-2025 Using Sbfp Fy 2024 Funds ₱ 4,083,366 Pasteurized Carabao's Milk 194,446 Pouch Specifications: 1. Locally Sourced/produced Pasteurized Carabao Milk, 200 Ml/pouch @ Php 19.00 Per Pouch Following Deped Standard Nutritional Requirements. 2. Flavor: Non-flavored 3. Serving Size: 200ml/pouch 4. Quality: Milk Should Be Received In Good Condition, Not Expired, No Signs Of Spoilage, Not Curdled, Not Slimy, And No Sour Smell. It Should Be Delivered Frozen Or With Ice. 5. Packaging: Individually Packed In High-density Polyethylene Plastic Sachets, Should Indicate The Batch And Lot Numbers. The Packaging Must Clearly And Readably Indicate The Manufacturing Date And Expiration Date. If Possible, There Must Be An Imprinted Sign Per Pack That Indicates "not For Sale". 6. Expiration: The Expiration Date Should Be A Week (7 Days) From The Date Of Delivery. 7. Nutritional Content: Particulars Minumum Amount Per Serving Energy 120-180 Kcal Protein 7-10 G Total Fat 3-7 G Saturated Fat 2-4 G Total Carbohydrates 7-27 G Dietary Fiber 0 G Sugar 7-27 G Calcium 220-480 Mg *energy, Protein, Carbohydrates, And Fats Must Be Expressed In Or Rounded Off To Whole Numbers, But Not In Any Way Lower Than The Minimum Amount As Stated Above. 8. Delivery Schedule: To Be Delivered Twice A Week, Every Monday And Thursday By 12 Noon. Refer To The Attached Pasteurized Carabao's Milk Schedule Of Delivery. 9. Drop-off Points: Cluster No. Drop-off Point School 1 Banquerohan Es 2 Taysan Es 3 Albay Central School 4 Bitano Es 5 Ibalon Central School 6 Bogna Es 7 Rawis Es 10. Number Of Feeding Days: Should Supply 200ml Pasteurized Carabao's Milk To 4,522 Beneficiaries For 43 Feeding Days Or A Total Of 194, 446 Pouches. 11. Sensory Evaluation And Acceptability Test: Should Pass The Sensory Evaluation And Acceptability Tests. Samples Must Be Provided To Schools And Drop-off Points Every Delivery For Sensory Evaluation And Acceptability Tests. Additional Terms Of Reference: 1. Essential Storage Instructions/information Must Be Prominently Displayed On The Label (e.g. “best Before Date”, The “expiration Date”, “keep Refrigerated”, “store In A Cool Dry Place”, “serve Chilled”, “shake Well Before Consuming”, Etc.). 2. Delivery: A. The Mode, Schedule And Other Specifications Of Delivery Shall Be Determined By The Sdo And The Supplier In Consideration Of The Local Conditions, And The Provisions Under The Operating Moa. Delivery Must Be Made Twice A Week, Every Monday And Thursday, For The Pasteurized Carabao Milk By 12 Noon At The Designated Drop-off Points. No Delivery Shall Be Made During Holidays And Weekends. Milk Pouches Must Be Sorted Based On The Milk Requirements Of The Recipient Schools At Each Drop-off Point Per Cluster. B. The Supplier's Delivery Personnel Should Wear Clean Attire With Personal Protective Equipment (ppe) Such As Face Masks, Hair Net, Hand Gloves, And Covered Footwear. They Are Not Also Allowed To Smoke While Inside The School Premises. C. The Supplier's Vehicle(s) Should Be Clean And Regularly Sanitized. It Should Not Be Used To Transport Unhygienic Materials Such As Wastes, Sand, Stones, And Other Constructions Materials. 3. Storage: A. In Addition To The Storage Instructions From Blss-shd, Supplies Must Be Unloaded At A Stockroom Or Designated Area; Safekeeping Of Milk Stocks Shall Be The Responsibility Of The School Head And School Personnel. B. The Pasteurized Milk Shall Be Stored In Freezers Or Chillers And Shall Be Stored In A Cool, Dry Place Prior To Its Distribution. When Necessary For Preservation, Unused Delivered Stocks For The Day Shall Be Stored Properly To Ensure Their Quality And Freshness. 4. Inspection And Acceptance: A. All Deliveries Of The Supplier Shall Be Subject To Inspection And Acceptance By The Sdo's Designated Drop-off-points B. All Milk Packs To Be Delivered Should Be Clean, Without Leaks, And Not Spoiled. Signs Of Spoilage Include, But Is Not Limited To, Off Odor, Bulging Packs, Curdled Or With Lumps, Thick Texture, Slimy Or Clotty. C. All Complaints Must Be Addressed Before The Expiry Date. 5. Recall And Replacement: A. Sdo/designated Drop-off-points Shall Reject All Milk Packs That Are Unclean, With Leaks And Spoiled Subject To Replacement By The Supplier Using Their Buffer Stocks Or On The Next Delivery. B. In The Event Of Food Poisoning, Dairy Allergies, And Other Food-borne Illnesses Proven To Be Caused By Defective Milk Prior To Acceptance Which May Lead To Hospitalization Or Death Of A Beneficiary, The Local Dairy Producer And/or Cooperative Shall Provide The Immediate Necessary Assistance Without Need Of Any Demand From The Pcc, In Accordance With The Agreement Of Both Parties To Be Followed By A Thorough Investigation. C. Prior To The Conduct Of Or Pending Investigation, The Supplier Shall Immediately Recall And Replace The Milk Products. 6. The Supplier Must Be Duly Certified By The Philippine Carabao Center (pcc) As An Eligible Organized Community Or Social Group Local Dairy Producer/cooperative In The Locality. 7. The Supplier Must Provide Samples Of Pasteurized Carabao's Milk To The School Feeding Coordinators, Property Custodians And School Inspectorate Team (sit) Of The Designated Drop-off-points Before The Initial Date Of Delivery. 8. The Supplier Must Submit To The Sbfp-milk Focal Person A Monthly Certificate Of Quality Compliance Issued By The Pcc. 9. Payment Shall Be Made To The Supplier In Accordance With The Existing Disbursement Procedures. General Requirements As Included By The Procuring Entity: Legal Requirements:  Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Requirements  Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration. Other Documentary Requirements Under Ra No. 9184 (as Applicable)  A Complete Set Of Request For Quotation May Be Acquired By Community Organization On October 30, 2024-november 7, 2024, From The Given Address And Websites Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos Only (php. 5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees To Be Presented In Person By The Bidder Or Its Authorized Representative Eligibility Requirements For Organized Community Or Social Groups Legal Requirements: A. Certificate Of Registration From The Dti, Sec, Cda, Da, Department Of Labor And Employment, Ncip; Or In The Case Of Civil Society Organizations, Non-government Organizations Or Peoples’ Organizations That Are Compliant With The Requirements Of A Csg, Registration From Ngas24 Or Lgus,25 And B. A Sworn Affidavit (appendix “1”) Executed By The Head Or Its Authorized Representative That Affirms That: I. None Of Its Incorporators, Officers Or Members Is An Agent Or Related By Consanguinity Or Affinity Up To The Third (3rd) Civil Degree To The Hope, A Member Of The Bac, The Technical Working Group (twg) Or The Secretariat, Or Other Official Authorized To Process And/or Approve The Proposal, Contract, And Release Of Funds; And Ii. None Of Its Incorporators, Officers Or Members Has A Related Business To The Community-based Project Being Procured At Hand; Or Disclosure Of The Members If They Have Related Business, If Any, To The Community-based Project Being Procured At Hand And The Extent Or Percentage Of Ownership Or Interest Therein. Technical Requirements C. Statement Of All Its Completed Contracts Similar To The Community-based Projects To Be Bid And/or List Indicating The Work Experiences Of Their Members That Reflect The Capacity To Deliver The Goods, Or Implement The Simple Infrastructure Projects, At An Equal Or Higher Established Standards. The End-user’s Acceptance Or Official Receipt(s) Or Sales Invoice Issued For The Completed Contracts Shall Be Attached To The Statement As Proof Thereof. Financial Requirements D. Photocopy Or Scanned Copy Of The Bank Book With Complete Bank Account Information; Or A Proof That It Maintains Books Of Accounts Such As Cash Receipts Journal, Cash Disbursement Journal, General Journal, And General Ledger. For Organized Csg That Has Participated In Any Government Community-based Project For The Past Two (2) Years: E. Latest Income Tax Return (itr) For The Preceding Tax Year Or For New Establishments, The Most Recent Quarter’s Itr Or Business Tax Return; And F. Updated Audited Financial Statement (afs), Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission. The Afs Shall Be Stamped Received By The Bureau Of Internal Revenue (bir) Or Accredited And Authorized Institutions, Or Electronically Received Via The Afs E-submission Of The Bir With A Filing Reference Number. Eligibility Requirements For Unorganized Community Or Social Groups Legal Requirements A. A Photocopy Of The Government-issued Id Of The Officers Or Members Of The Unorganized Csg Showing That They Are Residents Of The Target Community, Or Nearby And Other Communities If Allowed By The Pe; And B. A Sworn Affidavit (appendix “1”) Executed By The Head Or Authorized Representative That: I. None Of Its Organizers, Officers Or Members Is An Agent Or Related By Consanguinity Or Affinity Up To The Third (3rd) Civil Degree To The Hope, A Member Of The Bac, The Twg Or The Secretariat, Or Other Official Authorized To Process And/or Approve The Proposal, Contract, And Release Of Funds; And Ii. Commitment Of The Unorganized Csg That It Shall Perform And Deliver All The Obligations And Undertakings Under The Contract Covering The Procurement At Hand If No Performance Or Warranty Security Is Required By Pe. Technical Requirements C. List Of Completed Work Experiences Of The Members Of The Unorganized Csg That Meet Or Satisfy The Workmanship And Skill Set Requirements, Which Shows The Capacity To Perform The Required Labor Component For The Delivery Of Goods Or Implementation Of Simple Infrastructure Project. Financial Requirements D. Photocopy Or Scanned Copy Of The Bank Account Under The Name Of Any Of Its Officers Or Members With The Complete Bank Account Information; Or A Proof That It Maintains Books Of Accounts Such As Cash Receipts Journal, Cash Disbursement Journal, General Journal, And General Ledger. The Quotation Should Follow The Proper Sealing And Marking Of Documents With Tab Labels And Shall Be Submitted Or Mailed At The Address Indicated Below.

PrAT Cherkasy Chemical Fiber Tender

Ukraine
Closing Date9 Nov 2024
Tender AmountUAH 17 Million (USD 414 K)
Purchaser Name: PrAT Cherkasy Chemical Fiber | Послуги З Перевезення Та Оброблення/захоронення Шлаку Гранульованого

PrAT Cherkasy Chemical Fiber Tender

Civil And Construction...+1Civil Works Others
Ukraine
Closing Date9 Nov 2024
Tender AmountUAH 17 Million (USD 414 K)
Purchaser Name: PrAT Cherkasy Chemical Fiber | Послуги З Перевезення Та Оброблення/захоронення Шлаку Гранульованого

after Tender

Others
France
Closing Date26 Jan 2025
Tender AmountRefer Documents 
Details: The Works Include, For Information Only: 1-purges Of Sensitive Parts In Rockfill, 2-preliminary Purges Before Reinforcement By Sprayed Concrete, 3-support By Sprayed Concrete, Fiber Or Not. Installation Of Additional Ventilation For The Works..

Don Emilio Del Valle Memorial Hospital Tender

Electrical Cables And Wires...+1Electrical and Electronics
Philippines
Closing Soon5 Nov 2024
Tender AmountPHP 10 Million (USD 172.6 K)
Details: Description Project Title : Construction Of Isolation Building With Negative Pressure – Phase Iii Location : Devmh Compound, Bood, Ubay, Bohol Estimated Project Cost : Php 10,000,000.00 Terms Of Reference Summary Of Works A. General Requirements I. Mobilization/demobilization • The Work Consists Of The Mobilization And Demobilization Of The Contractor’s Forces And Equipment Necessary For Performing The Work Required Under The Contract. Ii. Permits And Licenses • Process And Submit Electrical Design Review Including Sign And Seal Of Electrical Plans, Electrical Review, Analysis, Computations And Signature Of Pee On Electrical Plans And Including All Forms And Plans For The Application Of Permit To Construct (ptc) For Doh Licensing. Design And Analysis Should Be Submitted Prior To Commencement Of Civil Works. Iii. Temporary Facilities • Temporary Facilities Shall Be Provided During The Construction Period And Will Be Constructed Within The Hospital Compound, Which Shall Serve As The Field Office, Storage Of Materials And Bunkhouse For The Workers. The Contractor Shall Provide And Maintain Temporary Power & Lighting, Temporary Water Service & Security Within The Construction Site. Iv. Health, Safety & Environment Control (complete Ppe, Safety Equipment & Devices & Safety Accessories And Signages) • Safety/warning Signage Must Be Placed By The Contractor On The Construction Area With Clear Demarcation Of Construction Zones To Prevent Unauthorized Access. • Detours And Closures: Provide Directions For Alternate Routes And Notice Of Any Closed Areas. • Hazard Notifications: Provide Signs Indicating Potential Dangers In Construction Areas (e.g., "hard Hat Area," "no Entry"). • Emergency Information: Clear Guidance On Emergency Exits And Procedures During Construction. • Fall Protection: Always Use Safety Harnesses And Guardrails. • Weather Conditions: Avoid Dismantling In High Winds, Rain, Or Extreme Temperatures. • Team Communication: Maintain Clear Communication Among Team Members And Healthcare Facility Engineering Team To Coordinate Movements And Tasks. V. As-built (record) Drawings & Related Documents • Submit One (1) Completed Set Of Signed And Sealed As-built Plans (whiteprint Copy) • Submit One (1) Set Of Electronic Files Of Signed And Sealed As-built Plans (cadd Editable File) • The Drawings Shall Be Supplemented With Descriptive Specification As Appropriate To Clearly Record The Exact Form And Content Of Work Described In This Specification And On The Drawings. • Maintain A Complete And Accurate Record Of All Changes Or Deviations To The Contract Documents And Shop Drawings In The Trade Contractor’s Field Office. Such Record Copy Shall Indicate The Work As Actually Constructed And Be Available For Hospital Appointed Engineer To Review. • Incorporate All Minor Revisions And Clarifications Noted Thru The Field Modification Process Which May Not Necessarily Be Shown On The Architectural Drawings Or Issued As Addenda, Bulletins, Or Change Orders. • Field Changes Shall Be Neatly And Correctly Shown On One Set Of Record Prints On A Daily Basis By The Foreman, Or Superintendent Of Ea • Ch Trade; And This Set Will Act As A Record Set At Completion Of The Work And Is Intended To Be Of Assistance To The Trade Contractor In Preparing Record Documents. Vi. Material Sustainability • The Contractor Shall Use At Least Ten Percent (10%) Locally Manufactured Materials For The Project. Submit Purchase Order And Other Supporting Documents As Evidence. • The Contractor Shall Avoid Using Building Materials/products That Contain Toxic Chemicals Or Use Materials That Are Low In Volatile Organic Compound. Please Refer To The Following Materials Specification As Stated On This Terms Of Reference. • The Contractor Shall Only Used Light Bulbs And Electrical Devices With More Efficient Models And Type As Specified On Approved And Signed Bill Of Quantities (e.g. Led Bulbs). Submit Purchase Order And Other Supporting Documents As Evidence. • The Contractor Shall Conform To The Following Painting And Other Wet Applied Materials (such As Coatings, Sealants) Requirements: 1. Only Qualified Products With Mpi "environmentally Friendly" E1 E2 E3 Rating Will Be Used. Paints, Coatings, Thinners, Solvents, Cleaners And Other Fluids Used In Repainting, Shall:  Not Contain Methylene Chloride, Chlorinated Hydrocarbons, Toxic Metal Pigments.  Be Manufactured Without Compounds Which Contribute To Ozone Depletion In The Upper Atmosphere.  Be Manufactured Without Compounds Which Contribute To Smog In The Lower Atmosphere. Be Manufactured In A Manner Where Matter Generating A 'biochemical Oxygen Demand' (bod) In Undiluted Production Plant Effluent Discharged To A Natural Watercourse Or A Sewage Treatment Facility Lacking Secondary Treatment Does Not Exceed 15 Mg/l.  Be Manufactured In A Manner Where The Total Suspended Solids (tss) Content In Undiluted Production Plant Effluent Discharged To A Natural Watercourse Or A Sewage Treatment Facility Lacking Secondary Treatment Does Not Exceed 15 Mg/l. 2. Paints And Coatings Must Be Manufactured And Transported In A Manner That Steps Of Processes, Including Disposal Of Waste Products Arising There From, Will Meet Requirements Of Applicable Governmental Acts, By-laws And Regulations In The Philippines. 3. Paints And Coatings Must Not Be Formulated Or Manufactured With Formaldehyde, Halogenated Solvents, Mercury, Lead, Cadmium, Hexavalent Chromium Or Their Compounds. Eco Labeled. 4. Anti-corrosive Coatings: Provide A Certification By The Manufacturer That Products Supplied Comply With The Volatile Organic Compound (voc) And Chemical Component Restrictions Of Green Seal Environmental Standard Gc-03, If The Product Is An Anti-corrosive Coating Applied Indoors And On-site. 5. Other Interior Coatings: If The Product Is Applied Indoors And On-site, And Not Covered By Both The Green Seal Environmental Standard Gs-11 And Standard Gc-03, Provide A Certification By The Manufacturer That Products Supplied Comply With The Chemical Component Restrictions Of The Green Seal Environmental Standard Gs-11, Paints, And Comply With The Volatile Organic Compound (voc) Restrictions Of The State Of California Air Resources Board (carb) Suggested Control Measure For Architectural Coatings, And The South Coast Air Quality Management District Rule 1113: Architectural Coatings B. Civil Works I. Site Works • The Contractor Shall Be Responsible In Setting Out Reference Lines, Elevations (lines And Grades) Prior And During The Execution Of The Works. All References Shall Be Maintained And Protected By The Contractor At His Own Expense. Disturbed References Shall Be Restored To Its Original Position Without Extra Cost To The Healthcare Facility. • Work Includes But Is Not Limited To:  Dismantling Of Chb Walls For Windows 01, 02 & 03  Dismantling Of Chb Walls For Doors 01 & 02  Dismantling Of Ceiling Board For Installation Of Additional Mepfs Works  Scaffolding For Painting Works (installation & Dismantling)  Roof Deck Coring Works For Mepfs Ii. Structural & Concrete Works (refer Applicable Sections On Chapter 4 Of The Nscp, For Quality Of Materials, Workmanship, Execution, Acceptance, Etc.) Iii.1. General • Provide All Labor, Materials, Equipment, Transportation, And Services Required To Complete All Work Specified Herein Indicated Or As Shown On The Drawings. • Work Includes But Is Not Limited To:  Slab On-grade, 3500 Psi (ground Floor Ramp Area Slab, Grid A-f, 1-2)  Concrete Countertop Sink, 3500 Psi  Stiffener Columns And Lintel Beams At Door And Window Openings, Every 3m Width And 2.1m Height Of Chb 2500 Psi Iii.2. Standards • Except As Modified By Governing Codes And By Contract Documents, Comply With The Provisions And Recommendations Of The Following, Latest Edition:  Ansi American National Standards Institute  Astm American Society For Testing Of Materials  Aci American Concrete Institute  Nbcp National Building Code Of The Philippines And Its Revised Irr  Nscp National Structural Code Of The Philippines Iii.3. Concrete • Structural Concrete – Monolithic Concrete Pouring Using Concrete Strength 3,500 Psi, Class Aa Ready Mix Or Job Mixed Concrete Together With The Concrete Cylinder Sample For Testing Materials. • Concrete Mix Shall Be Subject To Adjustment To Attain The Required Strength Or Desired Mix Consistency, Subject To Approval Of The Hospital Engineer. • Portland Cement, Type 1 • Manufactured Or River-run Run Gravel For Structural Concrete, ¾ “max Properly Graded” • Washed Sand For Structural Concrete • Water: Use Potable Water Free From Alkaline Or Deleterious Substance That May Affect The Strength Of Concrete. Use Of Rain Water Will Not Be Permitted. • All Materials Shall Be Free From Clay, Lumps Or Any Deleterious Object Or Matter That Will Impair The Strength Of Concrete. • Mixing Shall Be Thoroughly Done In A Mixer Of An Approved Size And Type To Insure A Uniform Distribution Of The Materials Throughout The Mass. • Site-mixed Concrete (job Mixed Concrete) - All Structural Concrete Shall Be Machine-mixed For At Least 1 ½ Minutes After All Materials Including Water Are In The Mixing Drum. No Hand Mixing Shall Be Allowed, Except In Case Of Emergency Of Breakdown During Pouring Operations. • Ready-mixed Concrete - Mixed And Delivered From A Plant Approved By The Project Manager, And Shall Be In Strict Compliance With The Requirements Set Forth In Astm C94. • Concrete Shall Be Placed Only After All Formworks, Materials To Be Embedded, And Preparation Of Surface Involved In The Placing Have Been Inspected And Approved By The Hospital Engineer. The Contractor Shall Provide Equipment And Shall Employ Methods That Will Minimize Separation Of Aggregates From The Concrete Mix. Concrete In Columns Shall Be Placed In One Continuous Operation. Concrete In Girders, Beams And Slabs In Superstructures Shall Be Poured In A Monolithic And Continuous Manner. No Construction Joint Shall Be Allowed On Any Part Of The Structure Without The Approval Of The Hospital Engineer. • Slump Of Concrete Shall Not Exceed 3 Inches • Placement Of Concrete Shall Be In Accordance To Standard Norms, When Using Portable Concrete Mixers. • Cure Concrete Sprinkling Water And Wetted Continuously For 7-day Period. Iii.4. Thermal Moisture Protection • Except As Modified By Governing Codes And By Contract Documents, Comply With The Provisions And Recommendations Of The Following, Latest Edition:  Ansi American National Standards Institute  Astm American Society For Testing Of Materials  Aci American Concrete Institute  Nbcp National Building Code Of The Philippines And Its Revised Irr  Nscp National Structural Code Of The Philippines Iii.5. Steel Reinforcements • Steel Reinforcements Shall Be Astm A615, Deformed Steel Bars, Grade 40. • Supply, Fabricate And Install Reinforcing Steel As Shown On Drawings. Placing Of Steel Reinforcements Shall Be In Accordance With Current Industry (local) Code (or Aci-347). • Secure The Reinforcements Using #16 G.i. Tie Wires. • Steel Reinforcement Shall Be Provided Together With All The Necessary Tie Wires, Spacers, Support And Other Necessary Devices. Reinforcing Steel Shall Be Accurately Cut And Bent In Accordance With The Approved Detailed Reinforcement Drawings. The Hospital Engineer May Require The Contractor To Prepare And Submit Bar Cutting Schedule Prior To Fabrication Of Reinforcing Steel Bars. • Steel Reinforcements Shall Be Free From Mill Scales, Rusts, Oils, Contamination That Will Impair The Bonding Property To Concrete. Iii.6. Structural Steel, Metal Works (refer Chapter 5 Of The Nscp) • Provide All Labor, Materials, Equipment, Transportation, And Services Required To Complete All Work Specified Herein Indicated Or As Shown On The Drawings. • Work Includes But Is Not Limited To:  Prefabrication Of Façade Louver Installation • Materials Steel And Metals For The Works Shall Meet The Requirements Of Astm A36, Hot-rolled Shapes And Plates. • All Steels Shall Be Primed With Epoxy-based Paint With -2- Finish Coats, Color Sample Must Be Submitted To Architect’s/engineer’s For Approval. Substrate Preparation Shall Meet The Requirements Of The Applicable Clauses Of The Steel Structures Painting Council, For Industrial Type Of Construction. All Surfaces Shall Be Free From Mill Scale, Rusts, Oils Or Any Contaminants Detrimental To Adhesion Of Paint. • Welding Works Shall Be In Accordance With Structural Welding Code (american Welding Society-d1.1, Latest Edition). Welding Electrodes Shall Be E6013 And E6012, Minimum, Meeting The Requirements Of Aws A.5. All Welders Shall Meet The Qualifications Under The Aws Codes And Standards. • All Works Under This Item Shall Be Subject To Verification By The Engineer Prior To Commencement Of Fabrication. Contractor Is To Submit Shop Drawings For Architect’s/engineer’s Review Prior To Execution. Iii.7. Formworks • All Forms Shall Be Designed By The Contractor For A Safe Construction Activity And Installed To Dimensions Shown On The Drawings. • Use Phenolic Boards On Formworks With Shoring Supports. • Forms Shall Be Used Whenever Necessary To Confine The Concrete And Shape It To The Required Lines And Dimensions, Or To Protect The Concrete From Contamination. Forms Shall Have Sufficient Strength To Withstand The Pressure Resulting From Placement And Vibration Of The Concrete, And Shall Be Maintained Rigidly In Correct Position. Forms Shall Be Sufficiently Tight To Prevent Loss Of Mortar From The Concrete. • Stripping Of Forms Shall Only Commence After The Concrete Has Gained Sufficient Strength (min Of 7 Days) For Major Structural Elements. C. Thermal Moisture Protection Furnish Materials And Labor And All Incidentals Necessary For The Completion Of All Thermal Moisture Protection Works Shown On Drawings And As Herein Specified. I. Moisture Protection – Cold Fluid Applied Waterproofing • Work Includes But Is Not Limited To:  Waterproofing Of All Toilet Floors  Waterproofing Of Roof Deck • Project Conditions:  Proceed With Waterproofing Operations Only After Substrate Construction And Penetrating Work Have Been Completed.  Proceed With Waterproofing Operations Only When Existing And Forecast Weather Conditions Will Permit Work To Be Performed In Accordance With Manufacturer’s Recommendations. Ii. Leak Plug: Rapid-setting Mortar For Plugging Leaks On Concrete & Sealant On Pipe Penetrations & Embedded Steel Ladder • Provide Leak Plug That Is An Ultra-rapid Set Plugging Mortar For Sealing Running Water Leaks Where Conventional Mortars Would Otherwise Be Washed Away. It Should Be Ideal For Sealing Leaks Before Applying Waterproof Renders In Cistern Tanks. Upon Setting, The Product Should Develop Excellent Structural Strength And Water Tightness. It Is Supplied As A Dry Powder That Needs Only The Addition Of Water. • Specifications:  Rapid-setting, Stopping Leaks Instantly  Easy To Use – Just Add Water  Durable – Provides Sufficient Strength  Chloride-free – Doesn’t Cause Corrosion, And Non-toxic • Uses For:  Sealing And Creating Coving On Corner Joints  Stopping Leaks  Filling Holes Before Waterproofing, Including The Cold-joints • Surface Preparation: Surfaces Should Be Brushed Clean To Remove Loose Material, Dust, And Laitance. Holes To Be Patched Should Be Cut Back To A Depth Of 20mm, And Feather Edges Must Not Be Allowed. Allowance Should Be Made For Wastage When Estimating. • General Application: Strictly Comply With Manufacturer's Written Installation Instructions, Including Preparation Of Substrate Surfaces, Detail Coatings Of Joints And Planar Changes In Substrate, And Priming Of Substrates. Apply The Mixed Leak Plug In Place, Ensuring Maximum Contact With The Substrate Before The Material Sets. If Being Used To Plug A Running Water Leak, The Mixed Leak Plug Should Be Held In Place Until It Reaches The Initial Set. Iii. Sealant On Pipe Penetrations • Provide A Heavy-duty Sealant That Is A Formulated Polymer Which Serves As A Multi-purpose Adhesive And Sealant. It Is A Rubber-like, Flexible, Single Component, Moisture Cure Adhesive, And Sealant That Is Engineered For The Bonding And Sealing Needs Of The Construction And Automotive Industry. • Specifications:  Heavy Duty Adhesive And Sealant  Excellent Adhesion To A Wide Variety Of Substrates  Interior / Exterior Application  Highly Flexible And Elastic  Durable With High Tensile And Shear Strength  Uv And Weather Resistance  Paintable  Easy Clean Up  Non-staining  No Solvent, Isocyanate, Voc Iv. Two-component, Flexible Cementitious Waterproofing Membrane • Provide A Two-component, Flexible Cementitious Waterproofing Membrane, Consisting Of A Selected Cement Blend With Well-graded Fillers And Synthetic Resin. • Specifications:  Flexible, Durable And Weather-resistant  Excellent Adhesion To Most Substrates  Excellent Waterproofing Qualities – Able To Withstand High Hydrostatic Pressure  Breathable Membrane – Permeable To Water Vapor And Yet Impermeable To Water  Bridge Hairline Cracks  Non-toxic – Suitable For Use In Waterproofing Of Potable Water Tanks  Can Be Applied Onto Damp Surfaces • General Applications: For Horizontal And Vertical Surfaces, A Roller And/or Paint Brush May Be Used To Apply The Slurry. Care Must Be Taken To Ensure That Air Is Not Entrapped In The Membrane. Apply The First Coat And Work Generously To Fill All The Pores And Honeycombs. Allow The Membrane To Dry For Approximately 2 To 3 Hours Before Application Of The Second Coat. The Second Coat Must Be Applied In A Crosswise Manner To Ensure An Even Coverage. Allow A Minimum Curing Time Interval Of 15 To 72 Hours Before Laying The Screed Or Performing A Ponding Test. Should The Ponding Test Exceed 4 Hours, A Minimum Curing Time Interval Of 72 Hours Is Recommended. Concrete Topping Is Recommended For Exposed Areas Subject To Regular Traffic. Apply A Thin Film Of Bonding Agent Before Applying The Concrete Topping. D. Architectural Works Furnish Materials And Labor And All Incidentals Necessary For The Completion Of All Architectural Works Shown On Drawings And As Herein Specified. I. Paint Finishes • Paint Materials And Samples Swatches Shall Be Approved By The Architect. • Examine Substrate And Conditions Under Which Painting Will Be Performed. Proceed With The Work Only When Conditions Are Satisfactory. • Do Not Paint Over Dirt, Rust, Scale, Grease, Moisture, Scuffed Surfaces, Or Conditions Otherwise Detrimental To Formation Of A Durable Paint Film. • Clean Surfaces To Be Painted Before Applying Paint Or Surface Treatments. Remove Oil And Grease Prior To Mechanical Cleaning. Program Cleaning And Painting So That Contaminants From Cleaning Process Will Not Fall Into Wet, Newly-painted Surfaces. • Perform Preparation And Cleaning Procedures In Accordance With Paint Manufacturer’s Instructions And As Herein Specified, For Each Particular Substrate Condition. • Ferrous Metals: Clean Non-galvanized Ferrous-metal Surfaces That Have Not Been Shop Coated; Remove Mortar, Plaster, Grease, Dirt, Rust, Loose Mill Scale And Other Foreign Substances By Solvent Or Mechanical Cleaning Methods That Comply With The Recommendations Of The Steel Structures Painting Council, Before Priming Coat Is Applied. I. Floor Finishes • Tile Works  General: All Surfaces To Receive Tiles, Shall Be Free From Loose Plaster, Where Required, Existing Setting Mortar Bed Shall Be Stripped, Removed To Allow Proper Setting Of Tiles To Desired Finished Elevation. No Separate Payment For Trimming Existing Mortar Bed And Shall Be Deemed Included Elsewhere.  Material Shall Be Subject To Review And Approval Of The Architect. Contractor To Submit Samples For Color And Texture Selection Prior To Delivery And Installation.  All Floor Cuttings On Both Ends Of The Walls Shall Be Of Equal Width.  Tile Grout Color To Match Color Of Tiles Or As Directed By The Architect.  Setting Bed Or Mortar Shall Be Dry Mixed, Sand-cement Mix With Water Added To Produce The Desired Consistency And Slurry Mix For Adhesion. Use Tile Adhesive For Areas That Are Less Than 1.5 Inches From Finish Floor Line.  All Exposed Corner Edges Shall Be Provided With Aluminum Stair Nosing.  No Human Traffic Or Construction Loads Shall Be Applied To All Newly Installed Tiles, And Allow Setting Mortar And Adhesive To Cure Prior. • Anti-bacterial Vinyl Sheet Works Work Includes But Is Not Limited To:  3mm Anti-bacterial Vinyl Sheets With Cove And Capping – All Areas As Indicated On Drawings.  Installation Materials: - Trowelable Leveling And Patching Compounds: Latex-modified, Portland Cement Based Or Blended Hydraulic Cement-based Formulation Provided Or Approved By Resilient Product Manufacturer For Applications Indicated. - Adhesives: Water-resistant Type Recommended By Manufacturer To Suit Floor Tile And Substrate Conditions  Installation Should Be Carried In Accordance With Local Standards. Subfloor To Be Smooth, Hard, Clean And Dry Prior To Laying.  Project Condition: - Maintain Temperatures Within Range Recommended By Manufacturer, But Not Less Than Deg C Or More Than 35 Deg C, In Spaces To Receive Floor Tile During The Following Time Periods: 1. 48 Hours Before Installation. 2. During Installation. 3. 48 Hours After Installation. - After Post-installation Period, Maintain Temperatures Within Range Recommended By Manufacturer, But Not Less Than 13 Deg C Or More Than 35 Deg C. - Close Spaces To Traffic During Floor Covering Installation. - Close Spaces To Traffic For 48 Hours After Floor Covering Installation. - Install Resilient Products After Other Finishing Operations, Including Painting, Have Been Completed.  Color And Patterns: - Colors And Patterns: As Selected By The Healthcare Facility From Manufacturer's Full Range.  Positioning: - As Far As Possible, And Depending On The Width Of The Rolls, Seams Between Strips Should Be Kept Away From Areas Of Heavy Load. - Within Rooms, Strips Should Be Laid Towards The Main Window Or In A Lengthwise Direction. - Within Corridors, Strips Should Be Laid In The Direction Of Pedestrian Traffic Unless Otherwise Stated In The Contract Specifications. Apply The Flooring Along The Chalk Line. - Mark A Longitudinal Axis For Reference To Place Strips. - Unroll Fully Material. - Check That The Edge Of Strips Is Straight. Align The Edge Of The First Strip To Longitudinal Axis To Have A Straight Reference. - Leave A Gap Of 1 Cm Between Every Strip To Let Possible Full Material Acclimation In Its Length As In Its Width. If Area Is Too Small, It Is Possible To Overlap Fully Two Strips. Welding Joints: Leave A Space Of Max 1 Mm Between The Strips Cold Seaming: Overlap The Strips In Order To Cut Edges Flush - Let Material Relax During 24h. Material Will Be In The Best Conditions To Be Glued And Material Tensile Or Bubbles Will Be Mostly Released.  Gluing And Fitting: - This Is Done 24 Hours After Having Unrolled And Laid Out The Lengths. - The Application Is Done By Priming And Using Acrylic Emulsifying Adhesives With A Finely Toothed Spatula Or Trowel A2 Norm Tkb Or 1/16” X 1/16” X 1/16” Square Notch (1.6 Mm X 1.6 Mm X 1.6 Mm). Coverage Rate Is 300 Gr/sqm. To Achieve This Coverage, It Is Necessary To Change The Spatula Regularly. Important: - Forbid Any Trafficking For 48 Hours After Laying As Well As Any Furniture Movement. - Follow Carefully The Recommendations Of The Adhesive Manufacturer. - Closely Follow The Adhesive Manufacturer’s Instructions With Particular Regard To Its Waiting Time (the Interval Between Application Of Adhesive And Laying Of Flooring). - Room Temperature And Humidity, Sub-floor Absorption And Adhesive Coverage Are Important In Order To Achieve Perfect Adhesion. Fold Back Half Of The Strips When Applying Glue To The Floor  Rolling Out: - Rolling Out Should Be Done In Two Stages: 1. Manually, Using A Cork Smoothing Press 2. By Rolling Over The Entire Surface With A 50kg Roller When Installation Is Complete. Stage 1: Pressing Down Manually Stage 2: Using A 50kg Roller - Trimming The Edge: 1. Use Of Coving As A Skirting System.  Welding: - Heat Welding Requires A Small Gap 1 Mm Max To Be Left Between The Sheets During The Gluing Process. Cold Welding Requires Perfectly Straight Edges. Employ An Overlap Cutting Method During The Gluing Process.  Putting Into Service – Allowing Traffic: After Installation: - For Normal Pedestrian Traffic, Allow 48 Hours - Before Moving Or Installing Furniture, Allow 72 Hours • Resinous Floor Coating System Works  Work Includes But Is Not Limited To: - Non-skid Polyurethane Floor Coating (ff-4) – Of Ramp, Mid-landing, Landing And Janitor’s Closet At 3rd Floor , And As Indicated On Drawings.  Product: - Performance Requirements: Non-skid Polyurethane Floor Coating (ff-4) – Provide A Modified Polyurethane Floor Coating Formulated For High Performance And Resistance To Abrasion. Special Kinds Of Aggregates Were Added To Offer Anti-slip For Protection Against Harmful Or Dangerous Slips On Dry And Wet Floorings. Low-emitting Materials: Flooring System Shall Comply With The Testing And Product Requirements Of The California Department Of Public Health's (formerly, The California Department Of Health Services') "standard Method For The Testing And Evaluation Of Volatile Organic Chemical Emissions From Indoor Sources Using Environmental Chambers." - Specifications: - Better Anti-slip Grip - Durable And Excellent Color Retention - Low Odor And Non-toxic - Excellent Adhesion On Surfaces - Non-flammable - Recommended Paint System: - Primer: 1 Coat Of A Two-component, 100% Solids Epoxy Specially Formulated As A High-strength Primer For Use In Priming All Concrete Surface And Steel Prior To The Application Of Any Resin-based Floor Coatings And Toppings. - High-protective Coating - Pigmented Binder For Seamless Broadcast Flooring - System - Low-viscosity Binder For Trowel Applied Mortar - Flooring - High-quality Concrete Epoxy Primer - For Damp Surfaces - Topcoat: 2 Coats Of Non-skid Polyurethane Floor Coating - General Application: Measure The Floor Area To Be Painted And Buy Enough Paint For The Entire Project. Stir Well. Apply Liberally. Avoid Light Foot Traffic For The Next 24 Hours. Do Not Apply When Surface Or Air Temperature Is Below 20°c Or If Rain Is Expected Within 5 Hours. Apply Liberally With A 3/8” Nap Roller, But Avoid Excessive Brushing Or Spreading Too Thinly. Do Not Let Water Sit On The Painted Surfaces Before 14 Days To Ensure Proper Curing. • Floor Tile Works  Toilets And Janitor’s Closet – 30cmx30cm Non-skid Homogeneous Floor Tiles.  Cuttings On Both Ends Of The Walls Shall Be Of Equal Width With The Floor Finish.  All Exposed Corner Edges Shall Be Provided With Pvc Tile Trims.  No Human Traffic Or Construction Loads Shall Be Applied To All Newly Installed Tiles, And Allow Setting Mortar And Adhesive To Cure Prior. Ii. Wall & Ceiling Finishes • Wall Tile Works  All Toilets – 30cmx60cm Glossy/polished Ceramic Tiles.  Cuttings On Both Ends Of The Walls Shall Be Of Equal Width With The Floor Finish.  All Exposed Corner Edges Shall Be Provided With Pvc Tile Trims. - No Human Traffic Or Construction Loads Shall Be Applied To All Newly Installed Tiles, And Allow Setting Mortar And Adhesive To Cure Prior. • Painting Works  Paint Materials And Samples Swatches Shall Be Approved By The Architect.  Examine Substrate And Conditions Under Which Painting Will Be Performed. Proceed With The Work Only When Conditions Are Satisfactory.  Do Not Paint Over Dirt, Rust, Scale, Grease, Moisture, Scuffed Surfaces, Or Conditions Otherwise Detrimental To Formation Of A Durable Paint Film.  Clean Surfaces To Be Painted Before Applying Paint Or Surface Treatments. Remove Oil And Grease Prior To Mechanical Cleaning. Program Cleaning And Painting So That Contaminants From Cleaning Process Will Not Fall Into Wet, Newly-painted Surfaces.  Perform Preparation And Cleaning Procedures In Accordance With Paint Manufacturer’s Instructions And As Herein Specified, For Each Particular Substrate Condition.  Ferrous Metals: Clean Non-galvanized Ferrous-metal Surfaces That Have Not Been Shop Coated; Remove Mortar, Plaster, Grease, Dirt, Rust, Loose Mill Scale And Other Foreign Substances By Solvent Or Mechanical Cleaning Methods That Comply With The Recommendations Of The Steel Structures Painting Council, Before Priming Coat Is Applied. • Painting Systems  Exterior Surfaces: - Concrete, Concrete Masonry, Rendered Smooth - Concrete Neutralizer – One (1) Coat, Dry For 6 Hours. - Putty Surface Imperfections, Hairline Cracks With Patching Compound Using Putty Knife - Prime – Two (2) Coats Flat Latex, Dry For Two (2) Hours. - Topcoat – Two (2) Coats Of Semi-gloss Latex, Two (2) Hours Interval Between Coats. - Thinning / Clean-up Solvent – Water - Application – By Brush, Roller, Or Airless Spray  Interior Surfaces: - Concrete, Concrete Masonry, Rendered Smooth - Concrete Neutralizer – One (1) Coat, Dry For 6 Hours. - Putty Surface Imperfections, Hairline Cracks With Patching Compound Using Putty Knife. - Prime – Two (2) Coats Flat Latex, Dry For Two (2) Hours. - Topcoat – Two (2) Coats Of Semi-gloss Latex, Two (2) Hours Interval Between Coats. - Thinning / Clean-up Solvent – Water - Application – By Brush, Roller, Or Airless Spray  Ceiling & Drywall Surfaces: - Repair Surface Imperfections With Putty Using Putty Knife, Dry For 2 Hours And Sand. - Apply Mesh Tape On Board Joints And Seal Gaps With Patching Compound. Dry For Two (2) Hours And Sand. - Primer – Flat Latex, Dry For Two (2) Hours. - Topcoat – Two (2) Coats Of White Flat Latex Paint, Two (2) Hours Interval Between Coats. - Thinning / Clean-up Solvent - Water - Application – By Brush, Roller, Or Airless Spray  Cabinetries, Closets, Counters, Doorjambs And Doors: - Primer: One (1) Coat Of Lacquer Primer Surfacer - When Necessary, Putty Surface Imperfections, Hairline Cracks With Lacquer Spot Putty Using Putty Knife. Dry For 4 Hours And Sand. - Primer: One (1) Coat Of Lacquer Primer Surfacer - Topcoat – Two (2) Coats Of Automotive Lacquer Paint Finish, One (1) Hour Interval Between Coats. - Thinning / Clean-up Solvent – Lacquer Thinner - Application – By Airless Spray • Dry Walls & Interior Wall Claddings  Walls - Fiber Cement Board In 12.00mm X 1.2m X 2.4m  Fiber Cement Board Shall Be Stored In Elevated And Well Protected Area. Boards With Broken Edges, Lacerations Etc. Will Not Be Permitted To Be Installed.  Framing - 2”x4” 0.5mm Thick Metal Studs Spaced At 0.40m X 0.40m On Centers And 2”x4” 0.5mm Thick Metal Tracks. • Dry Ceiling  Ceiling - Fiber Cement Board In 4.50mm X 1.2m X 2.4m  Fiber Cement Board Shall Be Stored In Elevated And Well Protected Area. Boards With Broken Edges, Lacerations Etc. Will Not Be Permitted To Be Installed.  Framing - On 0.40mm Thick, 19mm X 50mm Double Furring, And 0.80mm Thick, 12mmx38mm Carrying Channel With Vertical Hanger, Spaced At 0.40m X 0.40m On Centers. • Rendering To Chb Or Concrete Surfaces  All Surfaces To Be Rendered Or Cement Plastered Shall Be Clean From Any Loose Material Or Contamination To Provide Strong Bond Between Plaster And The Surface.  Mix Proportion Shall Not Be Less Than 1 Part Of Cement To 4 Parts Of Screened Sand. Necessary Adjustments Shall Be Made To Provide A Strong And Consistent Mix, Free From Cracking Due To Rapid Hydration Of Plaster Mix.  Tampering Of Previously Mix Concrete Will Not Be Permitted.  All Surfaces To Receive Paint Finish Shall Be Smooth Whilst Surfaces To Receive Tiles Shall Be Rough To Provide Better Adhesion Or Bond. • Doors And Windows  Glass Door (glass/glazing) – 10mm Thk. Tempered Clear Glass On 50mm X 100mm Powder-coated Aluminum Framed Sliding Door With 2" X 6" Powder Coated Aluminum Jamb With Complete Hardware Accessories.  Glass Partitions (glass/glazing) – 6.00mm Thk. Clear Tempered Glass Fixed Glass On Powder-coated Aluminum Frame W/ Complete Hardware Accessories.  Windows (glass/glazing) – 6.00mm Thk. Clear Glass Awning Type Analok Aluminum Frame W/ Complete Hardware Accessories And Window Frame Weatherstripping.  All Metal Doors And Jambs – Hollow Core Metal Flush Type Swinging Door With 2" X 6" Steel Jamb – All In Paint Finish By Spray, W/ Complete Hardware And Door Accessories, Including Door & Jamb Seals As Indicated On Drawings, Completely Operational  All Doors And Jambs – Provide All Door Keys With Key Chains And Key Tags With Color And Specifications Subject For Approval Of The Healthcare Facility. • Specialties  Concrete Countertop Sink - Finish – Countertop Granite Slab, 0.60x2.40mm, Full Bullnose Edge On All Areas As Indicated On Drawings - Inclusions – Countertop Backsplash And Aprons At 0.10m - Thickness – 32mm - Finish And Color – As Selected By Healthcare Facility - Do Not Use Defective Pavers That Might Be Visible Or Cause Staining In Finished Work. - Cut Unit To Provide Pattern Indicated And In A Manner That Will Provide Clean, Sharp, Unchipped Edges.  Supply And Installation Of Built-in Cabinets And Shelves - Finish – As Indicated On Drawings - Work Includes But Is Not Limited To: - 3rd Floor Icu Nurse Station - 3rd Floor Icu-med Prep Room - 3rd Floor Nurse Station - 3rd Floor Nurse Station-med Prep Room - 3rd Floor Nurse Station-clean Linens Room - Miscellaneous  Building/room Signages/wayfinding Systems  Third Floor - Signages - Room Identification Sign (for Patient Rooms) - "isolation Room 17", 6mm Thick Frosted Acrylic - Room Identification Sign (for Patient Rooms) - "isolation Room 18", 6mm Thick Frosted Acrylic - Room Identification Sign (for Patient Rooms) - "isolation Room 19", 6mm Thick Frosted Acrylic - Room Identification Sign (for Patient Rooms) - "intensive Care Unit", 6mm Thick Frosted Acrylic - Area Identification (sticker Mounted) - "icu Unit 1/2/3", Frosted Sticker Mounted On Glass Surface - Room Identification Sign (for Service Rooms) - "dirty Utility", 6mm Thick Frosted Acrylic - Room Identification Sign (for Service Rooms) - "nurse Station", 6mm Thick Frosted Acrylic - Room Identification Sign (for Service Rooms) - "medicine Preparation Room", 6mm Thick Frosted Acrylic - Regulatory Sign With Room Label (authorized Personnel Only) – “electrical Room”, 6mm Thick Frosted Acrylic - Regulatory Special Signs (access Ramp Sign), 6mm Thick Frosted Acrylic - Restroom Identification – “all Gender Toilet”, 6mm Thick Frosted Acrylic - 3rd Floor - Emergency Exit Plan, 6mm Thick Frosted Acrylic - Way Finder Sign, 6mm Thick Frosted Acrylic - Smoke Free Building Sign, 6mm Thick Frosted Acrylic  Ground To Second Floor - Signages - 2nd Floor - Emergency Exit Plan, 6mm Thick Frosted Acrylic - 1st Floor - Emergency Exit Plan, 6mm Thick Frosted Acrylic  Supply And Installation Of Left Façade Enclosure - Work Includes But Is Not Limited To: - All Wall Areas As Indicated On Drawings (specifically On Left Façade)  Material Specification: - Fixed Framings In Paint Finish - Miscellaneous To Complete All Works G. Plumbing Works Provide All Labor, Materials And Equipment And Perform All The Work Necessary For The Complete Execution Of All The Work As Shown On Drawings And Specified In This Specification. Scope Of Works Shall Include But Does Not Be Limited To The Following Major Items Of Work: • Sanitary And Waterline Piping Works  Furnish And Install Complete Water Distribution System Including Incoming Supply Pipes And Connections, Pipes, Valves, Faucets, Accessories, Etc.  Storage, Delivery, Protection Before Installation And Connection Of Sanitary Line Accessories.  All Sanitary Pipes And Fittings To Be Used Shall Be Made Of Polyvinyl Chloride (pvc Pipes) Series 1000  All Waterline Pipes And Fittings To Be Used Shall Be Made Polypropylene Random Co-polymer (ppr Pipes)  Connections From Existing Water Supply And Existing Catch Basins.  Pressure Testing Of The Installed Water Distribution System.  Leakage Testing Of Soil, Waste, Vent, And Catch Basins And Septic Tank  Disinfections Of Water Distribution System.  Furnish And Install All Required Consumable Materials And Materials Tube Installed.  Investigation Of All Conflicts Of This Work And Coordination With Other Trades. • Plumbing Fixtures, Toilet & Sink Accessories * Submit Samples For Approval Prior To Installation" ** Faucets, Valves & Other Accessories Shall Be Japan, U.s., & E.u. Made  Two-piece Water Closet/s (push Button,4/6 Liters Water Saver) With Wall-mounted Semi-recessed Ceramic Tissue Holder, Wall-mounted Semi-recessed Ceramic Soap Holder, Complete Accessories  Wall Hung Lavatory W/ Complete Fittings & Accessories  Wall Hung Lavatory W/ Half-pedestal W/ Complete Fittings & Accessories  Stainless Steel 304 Lavatory Faucet  Stainless Steel 304 Two-way Faucet W/ Telephone Shower  50x45x20 Cm Stainless Steel 304 Single Bowl Surface Mounted Kitchen Sink W/ Complete Fittings & Accessories  Surface-mounted Long Neck Faucet For Kitchen Sink (med. Prep. Room)  Hand Bidet  Ss 304 Towel Bar  Stainless Steel Floor Drain, 6"x6" H. Electrical Works Provide All Labor, Materials And Equipment And Perform All The Work Necessary For The Complete Execution Of All The Work As Shown On Drawings And Specified In This Specification. Scope Of Works Shall Include But Does Not Be Limited To The Following Major Items Of Work: • Panel Boards And Circuit Breakers At 3rd Floor 3 Blower (exhaust & Supply Blower Panelboard) Assembled In Nema 1 Enclosure, Wall Mounted, Swing Dead Front, Powder Coated With Terminal Lugs In Crimping Type Ready, With Grounding Busbar Main: 60at,3p, 100af, 10 Kaic, 230 V, Mccb Branches: 4 - 30at/100af, 2p, 230 V, Mcb 2 - 20at/100af, 2p, 230 V, Mcb • Roughing-ins  20mm Dia.upvc Pipe  20mm Dia. Upvc Male Adapter With Locknut  25mm Dia.upvc Pipe  25mm Dia. Upvc Male Adapter With Locknut  20mm Corrugated Electrical Flexible Hose  20mm Electrical Flexible Hose Connector  Junction Box With Cover  Utility Box  Square Box  Consumables • Wires And Cables  Thhn/thwn Wire - 2.0mm², 3.5mm², 5.5mm², 14.0mm², 60.0mm² • Wiring Devices  Single Pole Switch With Led Indicator, Flush Type Modern Series  Duplex Switch With Led Indicator Flush Type Modern Series  Triplex Switch With Led Indicator Flush Type Modern Series  Three-way Switch Two Gang  Duplex Universal Convenience Outlet, 3 Prong Modern Series, 16a, 230v  Duplex Universal Outlet, Floor Mounted Type, 16a, 230v  Acu Outlet, Universal, 30a, 230v W/ Grounding-type • Lighting Fixtures  4"ø Downlight, With 11w Led Recessed Mounted  60 X 60 Square Type Recessed Led Panel  Emergency Light  Exit Light  30 Watts Led Flood Light I. Auxiliary Works To Include Fixing And Installation; Complete Accessories And Necessary Consumables; All In Accordance With Auxiliary Plan And Specification And As Indicated On Detailed Cost Estimates: • Fire Alarm And Detection System  Roughing-ins / Wires: - 15mmø Emt Pipe, Coupling, Connector - Pullbox - Metal Flexible Conduit 1/2" - Straight Connector 1/2" - Junction Box W/ Cover - Utility Box - Conduit Supports / Hangers - 1.25mm2 Twisted Pair - Consumables - Equipment: - Smoke Detector • Paging System  Roughing-ins / Wires: - 15mmø Upvc Pipe, Male Adapter With Locknut - Metal Flexible Conduit 1/2" - Straight Connector 1/2" - Junction Box With Cover - 1.25mm2 Twisted Pair - Consumables - Equipment: - Ceiling Speaker • Cctv System  Roughing-ins / Wires: - 15mmø Upvc Pipe - 15mm Dia. Upvc Male Adapter With Locknut - Junction Box With Cover - Utility Box With Cover - Utp Cat 6 4pairs - 1 Gang Outlet - Consumables  Equipment: - Ip Camera Dome Type J. Fire Protection Works To Include Fixing And Installation; Complete Accessories And Necessary Consumables; All In Accordance With Fire Protection Plan And Specification. • Black Iron Pipes, Fittings, Valves And Accessories: - Bi Pipes Schedule 40 @ 6m, Seamless (also Including Drain Pipe Riser And Auto Sprinkler Riser) And All Fittings, Valves And Accessories As Indicated On Detailed Cost Estimates • Sprinkler Heads And Accessories - Pendent Type: 135 Degrees To 165 Degrees - Sidewall Type: Standard Coverage • Others – Hangers And Supports, Miscellaneous And Consumables (including Painting And Tagging) • Testing And Commissioning – Configuration, Testing And Commissioning, Documentation, Training And Orientation K. Mechanical Works To Include Fixing And Installation; Complete Accessories And Necessary Consumables; All In Accordance With Mechanical Plan And Specification And As Indicated On Detailed Cost Estimates: • Air-conditioning Works - 3.0 Hp Split Type Aircon, Inverter Type, - 2.0 Hp Split Type Aircon, Inverter Type - 1.0 Hp Split Type Aircon, Inverter Type - Consumables • Ventilation Works - Bag/s In Bag/s Out Exhaust Blower Equipment - Panel Carbon Filter 16"x16"x2" - Hepa Filter With Aluminum Separator - Ducting L. Request For Final Inspection • Contractor Shall Submit Its Written Request For A Final Inspection Of The Project To The Medical Center Chief Office At Least Seven (7) Days Prior To Project Inspection & Turn-over. M. Tools And Equipment • Various Basic And Advanced Masonry/electrical/carpentry Tools • Measuring And Layout Tools • Waterproofing Application And Miscellaneous Tools • Safety Equipment • Utility Vehicle General Guidelines • All Construction Works Shall Be Undertaken By Contractor In Accordance With Existing Laws And All Other Applicable Rules And Regulations. • The Contractor Shall Be Responsible In Setting Out Reference Lines, Elevations (lines And Grades) Prior And During The Execution Of The Works. All References Shall Be Maintained And Protected By The Contractor At His Own Expense. Disturbed References Shall Be Restored To Its Original Position Without Extra Cost To Devmh. • The Contractor Shall Carry Out The Works Properly And In Accordance With This Contract. The Contractor Shall Provide All Supervision, Labor, Materials, Plant And Equipment, Which May Be Required. • The Contractor Shall Commence Execution Of The Works On The Start Date And Shall Carry Out The Works In Accordance With The Approved Pert/cpm Network Diagram Submitted By The Contractor, As Updated With The Approval Of The Procuring Entity’s Representative, And Shall Complete The Works By The Intended Completion Date. • The Contractor Shall Be Responsible For The Safety Of All Activities On The Site. • During On-going Construction And Before The Turn-over Of The Project, Engineering & Facilities Management Staff, End-users, Twg And Bac Shall Inspect The Works Undertaken By Contractor. Hospital Engineers And End-users Discover Any Deviations By Contractor From The Approved Construction Plans, Contractor Shall Be Required To Rectify All Such Deviations, Within Such Period Required By Client. • Contractor Shall Have Full Responsibility For Any And All Damages To Existing Hospital Facilities, Utilities, And/or Any Portion Of The Hospital’s Common Area, Due To The Works Undertaken By Contractor, Whether Accidental Or Intentional. • No Variation Order Shall Be Undertaken Unless Verified By Hospital Engineer And Approved By Executive Committee. • Contractor Shall Not Cover Or Block Stub-outs (cleanouts, Water Source, Exhaust, Sewer, Drainage, Etc.) When Not Utilized. Said Stub-outs Shall At All Times Be Free Of Obstructions And Easily Accessible. • Contractor Shall Secure A Utility Tapping Permit Prior To Tapping From Utility Provision. • Electricity And Water Consumed During Construction Shall Be Charged To Contractor. • End-users Reserves The Right To Inspect The Works At Any Time. • Contractor Shall Insure And Hold Client, Its Affiliates, Officers, Directors, Stockholders, Employees, Agents, And/or Representatives, Free And Harmless From And Against Any Injury, Losses, Claims, Damages, Liabilities, Expenses, And/or Costs Of Litigation, Resulting From Or Arising Out Of The Works Undertaken By Contractor. • In Event Of Force Majeure, The Contractor Shall Rectify, Replace Or Build The Unfinished Projects When It Is Not Yet Completed And Accepted W/o Additional Cost For The Procuring Entity. • Contractor Shall Comply With The Construction House Rules Of This Hospital. Time Of Completion • The Completion Of The Project Shall Be One-hundred Twenty (120) Calendar Days From The Date Of Effectivity.

Bureau Of Customs Tender

Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Philippines
Closing Soon4 Nov 2024
Tender AmountPHP 940.9 K (USD 16.2 K)
Details: Description Specifications : Qty. Description 1 Lot A. General Conditions Complete All Works For The Project “renovation Of Xip Portal-designated Examination Area (dea) Covered Pathway” Including Supply Of All Materials, Equipment, And Systems, As Well As The Performance Of All Necessary Labor And Processes, In Accordance With The Plans, Specifications, The Bidding Documents, The Terms Of References And Other Related Contract Documents. The Contractor Is Not Limited To The Scope Of Works Listed. He Should Verify All Plans And Actual Conditions For The Necessity Of Work. If The Actual Situation Calls For Demolition, Removal, And Relocation He Shall Include Such And All Concomitant Works To Finish As Part Of The Scope Of Work. Any Discrepancies Found Between The Drawings And Specifications And The Site Conditions Or Any Errors Or Omissions In The Drawings Or Specifications Should Be Clarified With General Services Division (gsd) Architect /engineer. Should The Contractor Fail To Verify Or Clarify Discrepancies, Errors, Conflicts, Or Omissions In The Drawings And Specifications, It Shall Be Deemed That The Contractor Has Included In The Preparation Of His Bid The Necessary Works, Materials, Or Items Needed To Satisfy The General Scope Of Works. B. Scope 1. Mobilization A. Preparation Of Logistics Of Contractor’s Equipment; B. Setting Up Of Temporary Facilities Within The Site; C. Setting Up Of Necessary Water And Power Lines Required For The Project; D. Setting Up Of Temporary Fence Enclosure; E. Installation Of Project Details Tarpaulin Signage; And F. Inventory Of Items To Turn-over. 2. Site Works A. Site Demolition And Dismantling; B. Hauling Of Debris; C. Excavation For Septic Tank And Column; D. Backfilling And Compacting Of Excavated Soil; And E. Pouring And Compacting Of Gravel Bedding. 3. Structural Works A. Structural Concreting Of Slab On Fill Including Laying Of Reinforcing Bar And 4” Thick Compacted Gravel Bedding As Indicated In The Plans And Bill Of Quantities (boq); B. Structural Concreting Of Pedestal Column Including Supply, Fabrication, And Installation Of Pedestal Column’s Reinforcement Steel Bars As Indicated In The Plans And Boq; C. Supply, Fabrication And Installation Of Steel Column And Roof Beam As Indicated In The Plans And Boq; D. Supply, Fabrication And Installation Of Roof Framing As Indicated In The Plans And Boq; E. Supply, Fabrication, And Installation Of Roof; And F. Laying Of 2” Concrete Topping. 4. Carpentry Works A. Supply And Installation Of Ceiling Board With Complete Standard Metal Furring Support On All Ceilings As Indicated In The Plans And Boq; B. Supply And Installation Of 9mm Fiber Cement Board With Complete Standard Metal Stud Support On Drywalls As Indicated In The Plans And Boq; And C. Supply, Fabrication And Installation Of Vanity Counter Cabinet As Indicated In The Plans And Boq. 5. Tiling Works A. Supply And Installation Of Wall And Floor Tiles As Indicated In The Plans And Boq. 6. Door, Window, Mirror And Glass A. Supply And Installation Of All Door With Corresponding Door Jamb As Indicated In The Plans And Boq; B. Supply And Installation Of Glass Window As Indicated In The Plans And Boq; C. Supply And Installation Of Mirror As Indicated In The Plans And Boq; And D. Supply And Installation Of Tempered Glass Shower Partition As Indicated In The Plans And Boq. 7. Electrical Works A. Supply And Installation Of Complete Electrical System As Indicated In The Plans; B. Supply And Installation All Lighting Fixtures As Shown On The Reflected Ceiling Plan (rcp) Or As Specified By The Architect And/or End-user’s Representative; C. Supply And Installation Of Wiring Cables And Roughing-ins As Per Plans And Boq; D. Supply And Installation Of Wiring Devices, Switches, And Accessories As Indicated In The Plans And Boq; E. Complete Testing And Commissioning Of All Electrical Lighting System Using Valid Calibrated Test Equipment’s With General Services Division (gsd) Representative; F. Submission Of All Test Reports; And G. All Wiring Devices (lights And Switches) And Distribution Boards Shall Be Labelled Using Labelling Machine As Per Electrical Design Plan. 8. Plumbing Works A. Supply And Installation Of Plumbing Fixtures As Indicated In The Plans And Boq; B. Supply And Installation Of Plastic Septic Tank; C. Supply And Installation Of Piping For New Sanitary, Drainage And Waterline Layout; D. Supply And Installation Of Downspout Including Tapping Point To The Nearest Drainage Line; E. Fabrication And Installation Of Catch Basin Or Area Drain; F. Supply And Installation Of Waterline System Including Tapping To The Nearest Water Source; And G. Any Necessary Fittings And Accessories Not Indicated In The Plans Shall Be Provided To Complete The Installation. 9. Painting Works A. All Surface Defects Shall Be Repaired, And All Surfaces Shall Be Scraped To Remove Deteriorated Coatings And Other Deleterious Materials. Surfaces Shall Then Be Cleaned With Steam Or With A Commercial Cleaner To Remove All Grease, Oil, And Chemical Residues; B. Prior To Painting Works, Surfaces On Masonry, Wood, And Metal Must Be Free From Any Dirt, Grease, Old Paint, And Rust, Eliminate Loose Or Peeling Paint, And Get Rid Of Rust Deposits Before Applying Primer/putty And Paint Finish; C. Painting Of All Concrete And Steel Materials As Indicated In The Plans And Boq; And D. Contractor Shall Ensure That All Delivered Painting Materials To The Work Site Shall Be In Original Containers With Seals And Labels Intact. Containers Shall Not Be Opened Until After They Have Been Inspected By The End-user Or Its Duly Authorized Representative. 10. Restoration Work A. Supply And Installation Of Affected Pavers Block. B. Restoration Of Chip Road/floor Slab For The Installation Of Drainage Line System Including Catch Basin; And C. Restoration Of Any Necessary Materials/item That Need To Demolish/dismantle That Can Hinder The Approved Plan And Construction. 11. Demobilization A. Turn-over Of Items Covered By Inventory Submitted During Mobilization; B. General Site Cleaning; C. Submit Working Drawings (as-built Plan) Of The Following: - Architectural - Structural - Electrical & Auxiliary - Plumbing D. Hauling Of Debris And Materials From The Project Site To The Appropriate Disposal Area; And E. Removal And Hauling Of Tools And Equipment From The Project Site. 12. Permits, Licenses, And Taxes A. The Contractor Shall Secure And Pay All Permits, Fees, Licenses, Taxes, Etc. Necessary For The Execution Of The General Construction Works For The Project. B. The Contractor Shall Prepare The Complete Contract Documents Consisting Of Detailed Designs And Construction Drawings (architectural, Electrical, Structural, Mechanical, Plumbing/sanitary, Electronic And Communication Layout) In Accordance Needed By The Municipal Engineering Office For The Building Permit Purposes; And C. The Contractor Shall Prepare A Weekly Progress Report Which Shall Include An Overall Progress Chart Based On Actual Physical Accomplishment Of Construction Work And A Progress Chart Based On Actual Value Of Accomplished Construction Work, Among Others. 13. Payment Terms The Schedule Of Billing Specified In The Table Below Shall Be Followed By The Contractor: Order Of Billing Project Accomplishment Percentage First (1st) Billing At Least 50% Of The Work Has Been Accomplished Second (2nd) Billing At Least 80% Of The Work Has Been Accomplished Final Billing 100% Accomplished C. Specifications All Drawings, Whether Small Scale Or Detailed Drawings, Are Intended To Work In Unison With The Specifications And To Form Part Thereof, When Figures Are Given, They Are To Be Followed In Preference To Measurement By Scale. Anything Shown In The Drawings But Not Mentioned In The Specifications (or Vice-versa) Or Anything Not Expressively Set Forth In Either (but Which Is Reasonably Implied) Shall Be Furnished And Installed As Thought Specifically Shown In Mentioned Both. 1. Pre-construction Phase Guidelines A. A Joint Site Inventory Must Be Conducted And Signed By The Contractor, Gsd, And End-user; B. The Contractor Must Submit To Gsd His Program Evaluation Review Technique (pert) Chart To The Gsd Before The Start Of The Project; And C. The Contractor Must Submit To Gsd The List Of Manpower That Shall Be Utilized For The Project Along With Their Respective Designations/roles And Corresponding Qualifications. The Most Notable Figure For The Project Must Be The Project Manager, Preferably An Architect Or Engineer. 2. Implementation Phase Guidelines A. The Contractor Must Submit Weekly Progress Reports As Mentioned In Item B.13.c Of This Document Including Photo Documentations And Weather Update To Gsd; B. The Contractor Must Submit Weekly Their Daily List Of Manpower; C. The Project Manager, Who Must Be A Technical Professional, Must Be Present At The Project Site At All Times To Properly Monitor/oversee The Project As Technical Representative Of The Contractor’s Side; D. Boc, Thru Its Technical Inspection And Acceptance Committee (tiac) For Civil Works, Reserves Its Right To Conduct Monitoring Inspection, Aside From The Inspections For Billing Purposes. The Project Manager Must Always Be Present, Especially During Inspections For Billing Purposes, To Ensure Proper Communication Instead Of Relying On The Foreman Or Laborers Only; E. The Approved Floor Plan And Perspective Drawings Must Be Posted On A Wall Or Board So That They Are Readily Available And Visible Whenever Necessary; F. Materials To Be Used In The Construction/renovation Must Follow Those Specified In This Document (terms Of Reference), The Drawings, And/or The Boq. The Contractor Must First Secure Proper Approval Of Materials To Be Installed Via A Written Document Duly Approved By Both The End-user And Gsd. Any Change In Materials Must Also Have Proper Indorsement Thereafter. G. All Testings/activities (e.g., Waterproofing Test, Leak Test, Slump Test, Continuity Test, Insulation Resistance Test, Earthing Test, Pest Control Chemical Certificate, Etc.) Conducted By The Contractor Must Be Done With The Presence Of A Gsd Engineer/architect. Corresponding Reports Must Be Submitted To Gsd For Documentation And Validation Within Three (3) Calendar Days Upon Completion Of The Said Testing/activity; And H. Punchlisting Shall Be Conducted Upon 95.00% Completion As Ascertained By The Tiac. 3. Structural Steel A. All Structural Steel And Miscellaneous Metals Shall Conform To American Society For Testing And Materials (astm) Specification Designation For Carbon Steel With A Yield Strength Of 36,000 Pounds Per Square Inch (psi) (a36) Unless Otherwise Noted And Shall Be Fabricated And Erected In Accordance With The American Institute Of Steel Construction (aisc) Specification For The Design, Fabrication And Erection Of Structural Steel; B. All Welding Works Shall Comply With American Welding Society (aws) Specifications Standard And Performed By Certified Welders. All Welding Shall Be Performed By Electric Arc Process And Shall Be Done Using Approved Electrodes As Required By The Building Code. Welds Are Designed For Full Stress; C. Apply Two Coats Of Epoxy Primer For All Structural Shapes Prior To Erection, Repaint Areas Affected By Welding Works; And D. All Bolts, Screw Or Reinforced Bar That Will Be Drilled On Concrete Slab, Column, Wall, And Beams Shall Be Coated In Structural Epoxy Before Installation. I. Column Use 3” Galvanized Iron Steel Pipe Schedule 40 With 16mm Mild Steel (ms) Base Plate And 4 – 12mm Ø X 300mm Anchor Bolts. Ii. Roof Beam Use 2x4”x2.0mm Tubular Steel. Iii. Roof Framing Use 2x4”x2.0mm Tubular Steel For Rafters With 2x4”x2.0mm C-purlins Spaced At 600mm From Bottom Up To Apex Of The Roof Connected By 1”x5.0mm Angle Bar As A C-purlins Connector, 10mm Ø Round Bar For Sagrod In Between C-purlins Spaced At 1.2m On Center And Fascia Board With Angle Bar Frame. Iv. Roof Use Gauge #25 Longspan Prepainted Corrugated Type For Roof, Gauge#25 Prepainted For Gutter And Flashing And 10mm Single Foil For Insulation. 4. Concreting And Reinforcing Bars Works A. Concrete To Be Used Shall Have A Minimum Compressive Strength (fc’) Of 20.7 Mpa (3000 Psi) At 28 Days; B. Concrete Cover For Reinforcing Bars Shall Be As Follows: I. Foundation Elements Cast Against Earth – 75mm Ii. Foundation Elements Cast Against Form Or Lean Concrete – 40mm Iii. Beam And Columns – 40mm (measured To Stirrups And Lateral Ties); C. All Reinforcing Bars Shall Be Free Of Rust, Grease Or Other Materials That Will Impair Bonding; D. Reinforcing Bars Shall Have Minimum Yield Strength (fy) Of 276 Mpa; E. All Reinforcing Bars Shall Be Accurately And Securely Placed Before Pouring Concrete Or Applying Mortar Or Grout. F. Lap Splices Shall Be Staggered Such That Not More Than 50% Of Bars Are Spliced At The Same Point; I. Pedestal Column 250x250x1200mm (verify On Actual) Pedestal Column With 6-16mmø Vertical Reinforcement Steel Bars And 10mmø Lateral Ties Spaced At 3-50mm, 4-100mm, Rest 200mm On Center. Ii. Slab On Fill 125mm (verify On Actual) Slab On Fill With 10mmø Deformed Bar Spaced @ 300mm On Center Both Ways 5. Masonry A. Mixture Of Concrete Topping Shall Be One (1) Part Portland Cement And Two (2) Parts Sand Volume. 6. Carpentry Works All Wood Shall Be Treated With Colorless Anti Termite Wood Preservative. A. Ceiling Use 12mm Mr Gypsum Board For All Toilet And Pantry, 19x50x0.5mm Double Furring Spaced @ 400mm On Center, 12x38x0.8mm Carrying Channel Spaced @ 1.2m On Center, 25x25x0.5mm Wall Angle Along Perimeter Of The Area, Wood Ceiling Mouldings As Shown/indicated In The Plans And Boq. B. Cabinets Vanity Counter Use 20mm Marine Plywood Board With Edging For Cabinet Door And Carcass, 12mm Marine Plywood Board With Edging And Backing. Use Soft Closed Concealed Hinges, Soft Closed Drawer Guide, Porcelain Tiles, Synthetic Stone Slab Or Approved Equal For Countertop. (submit Material And Accessories For Approval). C. Drywall Partition Use 9mm Fiber Cement Board With 32x76x0.8mm Metal Studs Spaced @ 400mm On Center, 32x76x0.8mm Metal Tracks Spaced @ 1.2m From Slab Up To The Top Of Drywall Partition 7. Tiling Works The Tiles And Their Accessories Shall Be Free From Imperfection That Affects Their Quality, Appearance, And Strength. All Tiles Shall Be Set To Correct Grades And Level True To Lines, Laid Even. Submit Material For Approval. A. Floor I. Use 600x600mm Anti Slip Matte Porcelain Floor Tiles For Toilet. B. Wall I. Use 300x600mm Unglazed Ceramic Wall Tile For Toilet. 8. Doors, Windows, And Mirrors A. Door I. Door Shall Be Solid Panel Door Of Appropriate Size. Ii. Unless Otherwise Specified And Approved, Brass, Chromed Plated Loose Pin Hinges, Finely Finished. Iii. At Least Three (3) Pieces Of Hinges Per Leaf Of Doors For 2.10 Meters Height And 4 Pieces Of Hinger Per Lead Doors For 2.40 Meters Height. Use Ball Bearing Hinges Or Approved Equal. Iv. Door Shall Be Equipped With High Grade, Heavy Duty Or Standard Cylindrical Locksets, Door Closer And Stopper. (submit Material And Accessories For Approval). B. Window Awning Type Window Shall Be Powder Coated Aluminum Window With 6mm Tempered Clear Glass On Powder Coated Aluminum Framing. C. Mirror I. Mirror Shall Be 5mm Thick With 4x1" Powder-coated Aluminum Frame And 1/2” Fire Treated Marine Plywood (backing) D. Shower Glass Partition I. Glass Partition Shall Be 12mm Thick Tempered Glass Including Accessories And Fittings. 9. Painting Application Of Plastered Paint Finish On All Interior And Exterior Walls/partitions, Ceiling, And Concrete Surfaces Within The Scope Of The Interior And Exterior Renovation Works Unless Otherwise Indicated In The Plans And Specifications. A. All Paint And Accessories, Materials Incorporated In Or Forming A Part Thereof Shall Be Subject To The Approval And Selection Of Color, Tint, Finish, Or Shade By The Architect. B. Painting Of All Surfaces, Except Otherwise Specified Shall Be (3) Coats Work, One Primer And Two Finish Coats. C. All Paint Materials Shall Meet The Requirements Of Paint Materials Under Class A. D. All Surfaces To Be Painted Shall Be Examined Carefully Before Beginning Any Painting Work, And Other Trade Works Installed In Workmanship Condition To Receive Paint Or Ant Particular Finish. E. All Paint Materials Shall Meet The Requirements Of The Specifications Set By Gsd And Shall Be Delivered On The Job In The Original Container, With Labels Intact And Seal Unbroken. F. Concrete Surfaces. Latex Paint Shall Be Used, And Preparation And Application Must Be According To The Manufacturer’s Instructions. G. Drywalls; Latex Paint Shall Be Used, And Preparation And Application Must Be According To The Manufacturer’s Instructions. Use Spray Paint For Cubicle Partition. H. Wooden And Metal Surfaces; Automotive Lacquer Paint Shall Be Used, And Preparation And Application Must Be According To The Manufacturer’s Instructions. Use Spray Paint; And I. Color Pigments Shall Be Used To Produce The Exact Shades Of Paint, Which Shall Conform To The Approved Color Scheme. 10. Plumbing Works A. The Work Covered By This Section Consists Of Furnishing All Materials, Labor, Tools, And Equipment In Performing All Necessary Operations For The Installation Of The Complete Plumbing System Of Applicable Drawings. All Plumbing Works Shall Conform To The National Plumbing Code Of The Philippines; B. The Contractor Shall Be Responsible To Locate And Determine The Actual Location Of Existing Drainage Line To Conform With The Proposed Drainage System; C. Horizontal Drainage Piping Shall Run In Practical Alignment At A Uniform Grade Of Not Less Than Two Percent (2%); D. All Water Line Shall Be Polypropylene Random Copolymer (ppr) Pressure Nominal (pn) 20. Said Pipes Shall Be Pressure Tested Before Any Cutting Or Installation Is Done; E. All Drainage Pipe Shall Be Pvc Series 1000; F. Use 2030x1120x1070mm - 4mm Thk Pp/pe Composite Plastic Septic Tank, 50kg Weight, 1.5m3 Volume; And G. Use 4” Pvc Pipe For Downspout. 11. Electrical Works A. Quality Assurance - All Materials To Be Used Shall Be New And Shall Conform With The Reference Codes And Standards. Use Of Materials Shall Be Further Be Governed By Other Requirements, Impose On Other Sections Of These Specifications. Materials Shall Be Subject To Test Necessary Their Fitness If So Requires; B. Alternate Materials - Use Of Any Material, Not Specified In These Specifications May Be Allowed Provided Such Alternate Has Been Approved By The Agency In Accordance With Generally Accepted Standards; C. Identification Of Materials - Each Length Of Pipe, Fitting, Box, Fixture, And Device Used In The Electrical System Shall Have Cast, Stamped Or Indelibly Marked On It The Manufacturer's Trademark Or Name, The Weight, Type And Classes Or Product When So Required By The Standards Mentioned Above; D. Wires And Cables I. All Wires Shall Be Copper, Soft-drawn And Annealed, Shall Be Of 99% Conductivity, Shall Be Smooth And True And Of The Cylindrical Form And Shall Be Within +/-1% Variation Of The Actual Size Called For. Ii. Wires And Cables Shall Be Plastic Insulated For 600 Volts Working Pressure, Type Thermoplastic High Heat-resistant Nylon-coated (thhn) Unless Otherwise Noted. Iii. All Wires And Cables Shall Be Color Coded, Color-coding Of Wires Are As Follows: A. Line 1 – Red B. Line 2 – Yellow C. Line 3 – Blue D. Ground - Green Iv. Minimum Size Of Branch Circuit Wire Shall Be 3.5 Mm2 Thhn For Power And Lighting System With 3.5mm2 Thhn Minimum Ground Wire. V. Wires 3.5 Mm2 And Bigger Shall Be Stranded; E. Switches I. Switches Shall Be Flush Mounted And Rated At 15 Amperes (amps), 250 Volts, One Way, Three-way As Required. Ii. Switches Shall Be Quiet Type, Spring Loaded, And The Cover Plates Shall Be Subject To The Approval Of Gsd Architect And Engineer; And F. Receptacles I. Receptacles Shall Be Duplex, Flush Mounted And Rated At 10 Amps., 250 Volts, Parallel Or Tandem Slots With Grounding Slots As Required. All 110 Volts Receptacle Outlets Shall Be Rated 15 Amps, 120 Volts. 220 Volts Receptacle Outlets Shall Be Distinct From The 110 Volts Receptacle Outlets In Terms Of Configurations And Shall Be Provided With Markings. Ii. Cover Plates Shall Be Subject To The Approval Of The Architect And The Engineer. Stainless Steel Cover Plate Shall Be Required On All Wet Or Damped Area. Interested Suppliers Are Required To Submit Original/certified True Copy Of The Following: 1) Valid And Current Mayor’s Permit, (in Case Of Expired Mp/bp, Submit Copy Of Recently Expired Permit And Official Receipt As Proof Of Renewal), 2) Dti/sec Registration (for Partnerships/corporations, Attach General Information Sheet & Articles Of Incorporation), 3) Philgeps Registration Certificate, 4) Original Duly Signed Omnibus Sworn Statement (oss) And Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder, 5) Latest Income/business Tax Return, 6) Pcab License (license Category - C & D, Size Range - Small B), 7) Certificate Of Satisfactory Performance Issued By The Bureau Of Customs (for Contracts Entered Into With The Bureau) Or From Any Other Office/agency, If The Former Is Not Applicable And 8) Duly Signed Price Quotation Form (annex “a”). All Must Be Properly Signed And Sealed. Must Be Submitted In Hard Copy. Submission Of Quotation And Eligibility Documents In Hard Copy Is On Or Before November 04, 2024, 10:00 A.m., At General Services Division (gsd), Ground Floor, Ocom Building, Port Area, Manila. Award Of Contract Shall Be Made To The Lowest Quotation, Which Complies With The Minimum Description As Stated Above And Other Terms And Conditions Stated In The Price Quotation Form. Awarded Bidder Must Secure Performance Security/performance Bond 30% Of Contract Price Upon Receipt Of Notice Of Award. Any Interlineations, Erasures Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By The Bidder Or His/her Duly Authorized Representative/s. The Boc Reserves The Right To Accept Or Reject Any Or All Quotations And To Impose Additional Terms And Conditions As It May Deem Proper.

Bureau Of Fisheries And Aquatic Resources Region X Tender

Civil And Construction...+2Civil Works Others, Construction Material
Philippines
Closing Soon4 Nov 2024
Tender AmountPHP 1.4 Million (USD 25.2 K)
Details: Description Stock/ Property No. App No. Unit Item Description Quantity Unit Cost Total Cost 4.7 Lot 1. Materials Cu.m Concrete Works 1.15 9,321.74 1 Bags Portland Cement 9.00 270.00 2,430.00 2 Cu.m Washed Sand 2.00 1,250.00 2,500.00 3 Cu.m Gravel 3/4" 2.00 1,250.00 2,500.00 4 Sheet Marine Plywood, 1/4" Thk 3.00 490.00 1,470.00 5 Bdft Coco Lumber, 2" X 3" 52.00 35.00 1,820.00 Sq.m Masonry Works 21.90 3,553.79 6 Piece 4" Thk Chb 288.00 15.00 4,320.00 7 Bag Portland Cement, 40kg Bag 18.00 300.00 5,400.00 8 Cu.m Washed Sand 1.00 1,500.00 1,500.00 9 Length 10mm Dia. X 6.0m Def Bar 16.00 163.00 2,608.00 10 Kg #16 G.i. Tie Wire 1.00 100.00 100.00 11 Length Fluted Panel, Wpc, Wall 48.00 1,300.00 62,400.00 12 Box Tox With Screw, 10 X 1 1/2", 20/box 15.00 100.00 1,500.00 Sq.m Plastering Works 144.26 198.60 13 Bag Skimcoat 21.00 550.00 11,550.00 14 Bag Portland Cement, 40kg Bag 42.00 300.00 12,600.00 15 Cu.m Washed Sand 3.00 1,500.00 4,500.00 16 Sq.m Ceiling Works 153.30 746.73 17 Piece Carrying Channel, 12mm X 38mm X 0.8mm Thk 17.00 120.00 2,040.00 18 Length Wpc Panel, Ceiling 86.00 660.00 56,760.00 19 Bag Double Furring, 1"x2"x0.6mm Thk 55.00 137.00 7,535.00 20 Length M10 Threaded Rod, Full 20.00 285.00 5,700.00 21 Piece J-clip 77.00 21.00 1,617.00 22 Piece Anchor Bolt, 10mm Ø 77.00 70.00 5,390.00 23 Piece W-clip, Double 415.00 6.00 2,490.00 24 Box Blind Revit, 1/8"x3/4" 2.00 250.00 500.00 25 Kg Concrete Nail 1.00 100.00 100.00 26 Length Wall Angle, 1"x1"x0.5mm Thk 19.00 39.00 741.00 27 Sheet Fiber Cement Board, 4.5mm Thk 40.00 750.00 30,000.00 28 Box Black Screw, Metal, 1" 4.00 200.00 800.00 29 Piece Mesh Gypsum Tape, 2"x100' 4.00 50.00 200.00 30 Gallon Gypsum Putty 2.00 300.00 600.00 Sq.m Tiling Works 162.16 1,117.91 31 Lot Granite Slab, 2.4m X 0.6m, High Quality 1.00 20,000.00 20,000.00 32 Piece 0.60m X 0.60m Granite Tile 382.00 260.00 99,320.00 33 Piece 0.3m X 0.6m Granite Tile 203.00 210.00 42,630.00 34 Bag Portland Cement, 40kg Bag 28.00 280.00 7,840.00 35 Bag Regular Tile Adhesive, 25kg 25.00 250.00 6,250.00 36 Cu.m Washed Sand 2.00 1,500.00 3,000.00 37 Bag Tile Grout 32.00 70.00 2,240.00 Sq.m Painting Works (include Folding Panel) 159.70 616.99 38 Gallon Paint, Flat Latex 16.00 650.00 10,400.00 39 Gallon Paint, Primer 20.00 1,000.00 20,000.00 40 Liter Paint, Primer Reducer 20.00 650.00 13,000.00 41 Gallon Paint, Semi Gloss Latex, Beige 4.00 750.00 3,000.00 42 Gallon Paint, Semi Gloss Latex, Grey 6.00 750.00 4,500.00 43 Gallon Body Filler 3.00 550.00 1,650.00 44 Gallon Lacquer Primer 3.00 1,000.00 3,000.00 45 Gallon Lacquer Putty 3.00 550.00 1,650.00 46 Gallon Automotive Lacquer, White 3.00 1,210.00 3,630.00 47 Gallon Lacquer Thinner 8.00 550.00 4,400.00 48 Bottle Lacquer Flo 2.00 77.00 154.00 49 Pint Tinting Color, Burnt Amber Oil 3.00 132.00 396.00 50 Pint Tinting Color, Raw Sienna Oil 3.00 132.00 396.00 51 Pint Tinting Color, Lamp Black Oil 3.00 132.00 396.00 52 Gallon Oil Woodstain 2.00 830.00 1,660.00 53 Gallon Paint Thinner 2.00 550.00 1,100.00 54 Gallon Lacquer Top Coat Clear, Dead Flat 3.00 880.00 2,640.00 55 Gallon Concrete Sealer, Polyurethane 5.00 1,672.00 8,360.00 56 Liter Polyurethane Reducer 5.00 297.00 1,485.00 57 Gallon Concrete Neutralizer 1.00 924.00 924.00 58 Gallon Masonry Putty 8.00 374.00 2,992.00 59 Piece Paint Roller #7 20.00 90.00 1,800.00 60 Piece Paint Brush #4 10.00 90.00 900.00 61 Piece Paint Tray 10.00 110.00 1,100.00 62 Piece Sand Paper # 80 80.00 30.00 2,400.00 63 Piece Sand Paper # 100 100.00 30.00 3,000.00 64 Piece Sand Paper # 120 60.00 30.00 1,800.00 65 Piece Sand Paper # 240 30.00 30.00 900.00 66 Piece Sand Paper # 360 30.00 30.00 900.00 Lot Doors And Windows 1.00 75,240.00 67 Set Melamine Flush Door, 2.1m X 0.7m 2.00 9,250.00 18,500.00 68 Set Tempered Glass Panel Door W/ Alum Frame, 0.9m X 2.1m, 6mm Thk 1.00 15,000.00 15,000.00 69 Set Solid Wood Panel Door, 0.9m X 2.1m, Natural-stain Finish 1.00 4,000.00 4,000.00 70 Set Floor Hinge, Double Action, Heavy Duty 1.00 17,160.00 17,160.00 71 Sq.m Fixed Window In 6mm Tempered Glass On Aluminum Frame 8.40 2,450.00 20,580.00 Lot Carpentry Works (folding Panel, Wall Accent, Dry Wall, Audio Room Table & Toilet Cabinets) 1.00 93,178.00 72 Set Heavy Duty Galvanized Track Rail (top&bottom 3m) 7.00 2,470.00 17,290.00 73 Sheet Marine Plywood, 1/4" Thk 20.00 490.00 9,800.00 74 Set Aluminum Roller, Heavy Duty 12.00 700.00 8,400.00 75 Box Chipboard Screw (500pc/box) 1.00 120.00 120.00 76 Piece L Corner Support Bracket 25.00 99.00 2,475.00 77 Piece Flag Hinge 27.00 500.00 13,500.00 78 Box Wooden Black Screw, 30/box 17.00 130.00 2,210.00 79 Box Hardi Screw, 3/4" 1.00 500.00 500.00 80 Length Good Lumber, S4s 1" X 1 1/2" 32.00 150.00 4,800.00 81 Length Metal Studs, 32mm X 92mm X 0.5mm Thk 6.00 135.00 810.00 82 Sheet Fiber Cement Board, 4.5mm Thk 3.00 750.00 2,250.00 83 Piece Pan Head Screw, 3/4" 100.00 2.00 200.00 84 Box T Nail, 1" 1.00 330.00 330.00 85 Length Good Lumber, S4s 2" X 6" X 10' 14.00 747.00 10,458.00 86 Length Good Lumber, S4s 2" X 6" X 8' 7.00 605.00 4,235.00 87 Gallon Wood Glue 1.00 950.00 950.00 88 Box Gypsum Wood Screw, 2" 1.00 340.00 340.00 89 Kg Finishing Nail, 3" 1.00 160.00 160.00 90 Kg Assorted Nail 1.00 100.00 100.00 91 Set Concealed Hydraulic Hinges, Full Overlay, Heavy Duty 4.00 280.00 1,120.00 92 Set Concealed Hydraulic Hinges, Half Overlay, Heavy Duty 4.00 280.00 1,120.00 93 Set Concealed Hydraulic Hinges, Inset, Heavy Duty 24.00 280.00 6,720.00 94 Sheet Marine Plywood, 1/2" Thk 9.00 490.00 4,410.00 95 Kg Finishing Nail, 1" 2.00 140.00 280.00 96 Box Gypsum Wood Screw, 1" 2.00 300.00 600.00 Kg Steel Works (stairs ) 307.18 63.80 97 Length Angle Bar, 3" X 3" X 6mm Thk, 6m 4.00 2,292.00 9,168.00 98 Length Angle Bar, 1" X 1" X 4mm Thk, 6m 3.00 506.00 1,518.00 99 Length Flat Bar, 1" X 3mm Thk X 6m 32.00 161.00 5,152.00 100 Length Tubular Steel, 2" X 2" X 1.5mm Thk 4.00 940.00 3,760.00 Lot Electrical Works 1.00 130,774.00 101 Piece 2"x4" Utility Box, Heat Resistant 55.00 45.00 2,475.00 102 Piece 4"x4" Junction Box, Heat Resistant 55.00 45.00 2,475.00 103 Length 3/4" Ø Emt Pipe 2.00 950.00 1,900.00 104 Piece Screw Insulator 8.00 56.00 448.00 105 Length Pvc Conduit 1" Ø 37.00 177.00 6,549.00 106 Piece Pvc Clamp 3/4" Ø 74.00 23.00 1,702.00 107 Box #14 Thhn, 150m Box 2.00 3,470.00 6,940.00 108 Box #12 Thhn, 150m Box 1.00 5,700.00 5,700.00 109 Meter #8 Thhn 50.00 85.00 4,250.00 110 Meter #6 Thhn 30.00 142.00 4,260.00 111 Piece Electrical Tape (big) 30.00 51.00 1,530.00 112 Piece Led Pendant Light, 12.00 1,300.00 15,600.00 113 Piece Vertical Downlight Case Pinlight, Single-recessed, 15w 13.00 500.00 6,500.00 114 Piece Vertical Downlight Case Pinlight, Double-recessed, 11w 8.00 610.00 4,880.00 115 Set 4-piece Set Led Track Light Spotlight, 25w 2.00 2,210.00 4,420.00 116 Piece 3-gang Switch, Flush Type 1.00 110.00 110.00 117 Piece 2-gang Switch, Flush Type 2.00 150.00 300.00 118 Piece 1-gang Switch, Flush Type 4.00 170.00 680.00 119 Piece A/c Outlet W/ Plate 3.00 800.00 2,400.00 120 Piece 2-gang Universal Floor-mounted Outlet 12.00 2,420.00 29,040.00 121 Piece 2-gang Conv. Outlet, Flush Type 15.00 244.00 3,660.00 122 Piece 2-gang Gfci Outlet, Flush Type 2.00 950.00 1,900.00 123 Piece Circuit Breaker, 20 At-2p 4.00 800.00 3,200.00 124 Piece Circuit Breaker, 30 At-2p 9.00 800.00 7,200.00 125 Piece Circuit Breaker, 60 At-2p 1.00 1,350.00 1,350.00 126 Set Panel Board W/ 14 Branches 1.00 9,225.00 9,225.00 127 Pack Cable Tie 2.5x140mm, 100-pc Pack 22.00 60.00 1,320.00 128 Pack Pvc Cable Clip, 100-pc Pack 11.00 60.00 660.00 129 Piece Entrance Cap #1" Ø 1.00 100.00 100.00 Lot Plumbing Works 1.00 47,157.00 130 Set Bathroom Vessel Sink Countertop 2.00 3,500.00 7,000.00 131 Set Matte Black Stainless Faucet 2.00 1,000.00 2,000.00 132 Length 1/2" Dia. Blue Pipe, P.e Sde 11 5.00 100.00 500.00 133 Piece 1/2" Dia. Blue Pipe Tee 5.00 82.00 410.00 134 Piece 1/2" Dia. Blue Pipe Coupling 6.00 82.00 492.00 135 Piece 1/2" Dia. Blue Pipe Elbow 90° 10.00 93.00 930.00 136 Piece 1/2" Dia. Gate Valve 1.00 450.00 450.00 137 Piece 1/2" Dia. Check Valve 1.00 450.00 450.00 138 Piece Teflon Tape 3.00 60.00 180.00 139 Bottle Solvent Cement 1.00 200.00 200.00 140 Set 0.09 2.00 5,900.00 11,800.00 141 Set Stainless Brass Toilet Faucet 2.00 220.00 440.00 142 Set Stainless Toilet Paper Holder 4.00 850.00 3,400.00 143 Set Bidet 2.00 1,700.00 3,400.00 144 Length 3" Dia. Pvc Pipe, Sched 1000 5.00 700.00 3,500.00 145 Piece 3" Dia. Pvc Wye 5.00 95.00 475.00 146 Piece 3" Dia. Pvc Tee 2.00 85.00 170.00 147 Piece 3" Dia. Pvc Elbow, 90 Ø 5.00 85.00 425.00 148 Piece 3" Dia. Pvc Elbow, 45 Ø 5.00 85.00 425.00 149 Piece 3" Dia. Pvc Coupling 2.00 80.00 160.00 150 Length 4" Dia. Pvc Pipe, Sched 1000 5.00 800.00 4,000.00 151 Piece 4" Dia. Pvc Wye 3.00 95.00 285.00 152 Piece 4" Dia. Pvc Tee 3.00 85.00 255.00 153 Piece 4" Dia. Pvc Elbow, 90 Ø 5.00 85.00 425.00 154 Piece 4" Dia. Pvc Elbow, 45 Ø 5.00 85.00 425.00 155 Piece 4" Dia. Pvc Coupling 2.00 80.00 160.00 156 Set 4" X 4" Floor Drain, Stainless 3.00 300.00 900.00 157 Piece Vanity Mirror 1.00 1,500.00 1,500.00 158 Piece Wall-mounted Soap Dispenser 2.00 1,200.00 2,400.00 Lot Electronics System Works 1.00 24,750.00 159 Set Hdmi Splitter, 3port W/ Power Supply 3.00 2,000.00 6,000.00 160 Meter Hdmi Cable, Heavy Duty, 15 Meters 2.00 2,000.00 4,000.00 161 Meter Hdmi Cable, Heavy Duty, 20 Meters 2.00 2,500.00 5,000.00 162 Roll Utp Cable Cat6 1.00 4,500.00 4,500.00 163 Piece 3-gang Convenience Outlet 3.00 250.00 750.00 164 Set Usb Wire Extension, 20 Meters 3.00 1,500.00 4,500.00 Sub Total (lot 1) 902,181.00 - Lot 2. Labor 0.00 - 165 M.d. Demolition Works 135.00 728.00 98,280.00 166 M.d. Concrete Works 8.00 728.00 5,824.00 167 M.d. Masonry Works 56.00 728.00 40,768.00 168 M.d. Plastering Works 20.00 728.00 14,560.00 169 M.d. Ceiling Works 90.00 728.00 65,520.00 170 M.d. Tiling Works 117.00 728.00 85,176.00 171 M.d. Painting Works (include Folding Panel) 90.00 728.00 65,520.00 172 M.d. Doors And Windows 27.00 728.00 19,656.00 173 M.d. Carpentry Works (folding Panel, Wall Accent, Dry Wall, Audio Room Table & Toilet Cabinets) 77.00 728.00 56,056.00 174 M.d. Steel Works (stairs ) 16.00 728.00 11,648.00 175 M.d. Electrical Works 88.00 728.00 64,064.00 176 M.d. Plumbing Works 30.00 728.00 21,840.00 177 M.d. Electronics System Works 15.00 728.00 10,920.00 Sub Total (lot 2) 559,832.00 Grand Total 1,462,013.00 *****nothing Follows*****

FUNDACION P BLICA GALLEGA CENTRO TECNOLOGICO DE SUPERCOMPUTACION DE GALICIA CESGA Tender

Software and IT Solutions...+2Electronics Equipment, Electrical and Electronics
Spain
Closing Date21 Jan 2025
Tender AmountEUR 312 K (USD 337.6 K)
Spain-santiago De Compostela: Communications Network
871-880 of 939 active Tenders