Fencing Tenders

Fencing Tenders

Department Of Public Works And Highways - DPWH Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Invitation To Bid (cw-02-2025-010) 1. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Through Its Bids And Awards Committee (bac), Invites Contractors To Submit Bids For The Following Contracts 1.1 Name Of Contract : Convergence And Special Support Program, Basic Infrastructure Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building (auditorium Building), Barangay Tambo, Lipa City, Batangas Contract Id No. : 24dd0293 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Two (2) Storey Auditorium (23.95m X 21.70m) Including Catwalk, Structural Works, Architectural Works, Electrical Works, Auxiliary Works And Mechanical Works Approved Budget For The Contract : Php 79,200,000.00 Source Of Funds : Sr2024-12-023371 Contract Duration : 300 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.2 Name Of Contract : Convergence And Special Support Program, Basic Infrastructure Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building, Lodlod Elementary School, Barangay Lodlod, Lipa City, Batangas Contract Id No. : 24dd0294 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 4sty16cl School Building (46.00m X 9.50m) Including Structural Works, Finishing Works, Electrical Works, Installation Of 1-75kva Transformer, Mechanical Works, Water Pumping System, Cctv System, Fire Alarm System, Auxiliary Works, Construction Of Power House (3.50m X 2.80m), Handwashing On Both Sides And Demolition Of Existing Structure Approved Budget For The Contract : Php 71,280,000.00 Source Of Funds : Sr2024-12-023371 Contract Duration : 225 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.3 Name Of Contract : Convergence And Special Support Program, Basic Infrastructure Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building, Inosloban Marawoy Integrated National High School, Barangay Marawoy, Lipa City, Batangas Contract Id No. : 24dd0295 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 4sty8cl School Building (237.00 Sq.m.) Including Structural Works, Finishing Works, Electrical Works, Installation Of 1-75kva Transformer, Mechanical Works, Water Pumping System, Cctv System, Fire Alarm System, Auxiliary Works, Construction Of Power House (3.50m X 2.80m), Handwashing On Both Sides And Demolition Of Existing Structure Approved Budget For The Contract : Php 51,480,000.00 Source Of Funds : Sr2024-12-023371 Contract Duration : 165 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.4 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Construction Of Slope Protection Along Catandala Bridge, Barangay Catandala, Ibaan, Batangas Contract Id No. : 25dd0229 Project Location : Ibaan, Batangas Scope Of Works : Construction Of 596.00 L.m. Revetment Using Gabions (right Side, Upstream) And 600.00 L.m. - 1220mm Dia. Rcpc Drainage Structures Approved Budget For The Contract : Php 96,500,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 244 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.5 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building (barangay Gym), Barangay Lumbang, Lipa City, Batangas Contract Id No. : 25dd0230 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Covered Gym (33.60m X 18.30m) Including Demolition, Structural Works, Architectural Works, Plumbing Works, Electrical Works, Mechanical Works, Auxiliary Works And Installation Of 3-75kva Transformer Approved Budget For The Contract : Php 44,550,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 240 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 25,000.00 1.6 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building At Tibig Elementary School, Barangay Tibig, Lipa City, Batangas Contract Id No. : 25dd0231 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 4sty8cl School Building (23.00m X 9.50m) Including Architectural Works, Plumbing Works, Electrical Works, Installation Of 1-50kva Transformer, Mechanical Works, Auxiliary Works, Cctv System And Demolition Approved Budget For The Contract : Php 37,620,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 180 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 25,000.00 1.7 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building At Barangay San Salvador, Lipa City Batangas Contract Id No. : 25dd0232 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Three (3) Storey Multi-purpose Building (22.80m X 9.40m) Including Structural Works, Architectural Works, Plumbing Works, Electrical Works, Installation Of 1-50kva Transformer, Mechanical Works, Airconditioning Unit, Water Pumping System And Demolition Approved Budget For The Contract : Php 29,700,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 210 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 1.8 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building (gym) At Barangay Sampaguita, Lipa City, Batangas Contract Id No. : 25dd0233 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Multi-purpose Building (35.00m X 19.97m) Including Structural Works, Architectural Works, Finishing Works, Plumbing Works, Playing Area, Electrical Works, Pole Mounted Distribution Transformer, Auxiliary Works, Mechanical Works, Ventilating System And Fire Extinguishers Approved Budget For The Contract : Php 29,700,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 180 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 1.9 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Buenventura-castillo Multi-purpose Building Including Site Facilities At Brgy. Palanca, San Jose, Batangas Contract Id No. : 25dd0234 Project Location : San Jose, Batangas Scope Of Works : Construction Of Gym (30.50m X 18.70m) Including Stage, Health Center, Structural Works, Plumbing Works, Electrical Works And Auxiliary Works Approved Budget For The Contract : Php 16,830,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 180 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 1.10 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building At Mabini Elementary School, Barangay Mabini, Lipa City, Batangas Contract Id No. : 25dd0235 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Three (3) Storey Admin Building (11.40m X 10.00m) Including Structural Works, Architectural Works, Plumbing Works, Electrical Works, Installation Of 1-37.5kva Transformer, Mechanical Works, Airconditioning Unit, Water Pumping System And Demolition Approved Budget For The Contract : Php 14,850,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 180 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 1.11 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Buildings/facilities, Rehabilitation Of Road Including Drainage Structure, Bagong Pook, Lipa City, Batangas Contract Id No. : 25dd0236 Project Location : Lipa City, Batangas Scope Of Works : Rehabilitation Of 160.00 L.m. Road With Width Of 3.00m And Thickness Of 0.20m; Rehabilitation Of 966.00 L.m. - 760mm Dia. Rcpc Drainage Structure Including Sidewalk, Manhole And Grouted Riprap Approved Budget For The Contract : Php 14,700,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 158 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 1.12 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building At Barangay Sto. Niño, Lipa City, Batangas Contract Id No. : 25dd0237 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Three (3) Storey Barangay Hall (10.90m X 7.90m) Including Demolition, Structural Works, Architectural Works, Plumbing Works, Mechanical Works, Electrical Works And Water Pumping System Approved Budget For The Contract : Php 11,266,200.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 150 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 1.13 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building, Barangay Galamay Amo, San Jose, Batangas Contract Id No. : 25dd0238 Project Location : San Jose, Batangas Scope Of Works : Construction Of Four (4) Storey Multi-purpose Building (8.40m X 7.00m) Including Demolition, Structural Works, Roofing Works, Sanitary Works, Finishing Works, Electrical Works And Mechanical Works Approved Budget For The Contract : Php 9,900,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 150 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 10,000.00 1.14 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Facilities At Leoncio L. Patulot Memorial School, Barangay Adya, Lipa City, Batangas Contract Id No. : 25dd0239 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 244.00 L.m. Perimeter Fence Including Handwashing Area, Concrete Pavement, Landscaping And Installation Of Cctv System Approved Budget For The Contract : Php 7,920,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 150 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 10,000.00 1.15 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Rehabilitation Of Multi-purpose Building (barangay Hall), Barangay Tangob, Padre Garcia, Batangas Contract Id No. : 25dd0240 Project Location : Padre Garcia, Batangas Scope Of Works : Rehabilitation Of Three (3) Storey Barangay Hall (13.43m X 5.52m) Including Roofing Works, Plumbing Works, Painting Works, Ceiling Works, Electrical Works, Mechanical Works, Replacement Of Tiles, Construction Of Stairs & Partition Wall, Water Pumping System And Transformer Approved Budget For The Contract : Php 6,435,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 90 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 10,000.00 1.16 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Rehabilitation Of Multi-purpose Building (barangay Hall), Barangay Poblacion 3, San Jose, Batangas Contract Id No. : 25dd0241 Project Location : San Jose, Batangas Scope Of Works : Rehabilitation Of Two (2) Storey Barangay Hall (20.96m X 7.60m) Including Structural Works, Partition Wall, Handwashing Area, Installation Of Sidings For Parking Area, Replacement Of Roofing Frame & Roofing Sheets, Architectural Works, Replacement Of Tiles, Repainting Of Wall, Ceiling Works, Electrical Works And Plumbing Works Approved Budget For The Contract : Php 4,950,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 90 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 5,000.00 1.17 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Improvement Of Multi-purpose Building (covered Court) At Barangay Balagtasin, San Jose, Batangas Contract Id No. : 25dd0242 Project Location : San Jose, Batangas Scope Of Works : Improvement Of Multi-purpose Building (22.15m X 31.83m) Including Structural Works, Plumbing Works, Electrical Works, Auxiliary Works, Cctv System, Installation Of 1-15kva Pole Mounted Distribution Transformer, Mechanial Works And Ventilating System Approved Budget For The Contract : Php 4,950,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 90 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 5,000.00 1.18 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Rehabilitation Of Multi-purpose Building At Don Luis, San Jose, Batangas Contract Id No. : 25dd0243 Project Location : San Jose, Batangas Scope Of Works : Rehabilitation Of Three (3) Storey Main Building (47.65m X 28.25m), Two (2) Storey Legislative Building (50.45m X 15.90m) And Two (2) Storey Archive Building (77.40m X 16.70m) Including Tile Works, Ceiling Works, Electrical Works, Plmbing Repair Works, Carpentry Works, Replacement Of Plumbing Fixtures And Replacement & Installation Of Doors & Windows Approved Budget For The Contract : Php 4,950,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 90 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 5,000.00 1.19 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Construction Of Drainage System At Barangay Anilao Labac, Lipa City, Batangas Contract Id No. : 25dd0244 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 260.50 L.m. - 760mm Dia. Rcpc Drainage Including Concrete Cover And Pccp Approved Budget For The Contract : Php 4,900,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 95 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 5,000.00 1.20 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Rehabilitation Of Drainage System At Barangay Poblacion B, Rosario, Batangas Contract Id No. : 25dd0245 Project Location : Rosario, Batangas Scope Of Works : Rehabilitation Of 151.30 L.m. - 610mm Dia. Rcpc On Both Sides Including Rehabilitation Of Pccp With Thickness Of 0.23m Approved Budget For The Contract : Php 3,960,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 69 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 5,000.00 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category And Classification As Indicated On The Above Table. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Annex Ii-1.1 B Section Ii And Iii Of Bidding Documents. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 4. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, And Inspect The Bidding Documents At Marawoy, Lipa City, Batangas During Weekdays From 08:00 A.m To 05:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On February 13, 2025 To March 04, 2025, 8:00 A.m.-5:00 P.m.; March 05, 2025, 8:00 A.m.-8:15 A.m. From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Pursuant To The Latest Guidelines Issued By The Gppb Amounting To The Responding Cost Of Bidding Documents Indicated On The Above Table. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Dpwh Website, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office Will Hold A Pre-bid Conference Physically And/or Through Live-streamed On Youtube On February 21, 2025 At 09:00 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Which Shall Be Open To Prospective Bidders. For Youtube Livestreaming, Https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq 7. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. For Bids To Be Submitted Electronically/online, The Following Procedures Should Be Observed Following Department Order No. 87, Series Of 2020. It Is Also Indicated In The Bds. 8. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_batangas4@dpwh.gov.ph For Electronic Submission On Or Before March 05, 2025 At 08:30 A.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. 9. Bid Opening Shall Be On March 05, 2025 At 08:30 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas And Through Live-streamed On Youtube (https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq). Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 10. "if At The Time Of The Post-qualification Procedure, The Bac Verifies That Any Of The Deficiencies Is Due To The Contractor’s Fault Or Negligence Pursuant To 34.3(b)(ii) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 (2016 Irr Of Ra 9184), The Procuring Entity Shall Disqualify The Contractor From The Award Without Any Right To Reimburse Fees And Incidental Cost Paid For The Procurement Of Infrastructure Contract Subject Of The Bid. " 11. The Dpwh-batangas Iv District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35 And Section 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. All Representatives Who Will Submit Their Bids Must Be Duly Authorized And Registered Liaison Officers As Reflected In The Contractor Registration Certificate (crc). Authorized Representatives Are Required To Present Their Company Ids And Government Id For Verification Purposes. 13. Please Be Informed That On The Day Of Bid Opening, The Approved Appointment Intended For Purchasing Bidding Documents Will Be Limited To Two (2) Prospective Bidders Only To Strictly Follow The Bid Opening Schedule. Secure The Approved Appointment To Dpwhbats4appointment@gmail.com 14. For Further Information, Please Refer To: Leo S. Matias Engineer Iii Bac, Chairperson Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Matias.leo@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com Queen Mariciel J. Sianquita Engineer Ii Head, Bac Secretariat Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Sianquita.queen_mariciel@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com 15. You May Visit The Following Websites: For Downloading Of Bidding Documents At Www.dpwh.gov.ph & Www.philgeps.gov.ph For Online Bid Submission At Electronicbids_batangas4@dpwh.gov.ph February 12, 2025 Approved By: Leo S. Matias Bac, Chairperson Noted By: Jehela G. Roxas District Engineer Date Of Publication: February 13, 2025 To February 19, 2025 Publication: Dpwh Website/ Philgeps
Closing Date5 Mar 2025
Tender AmountPHP 4.9 Million (USD 85.3 K)

Department Of Public Works And Highways - DPWH Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Invitation To Bid (cw-02-2025-010) 1. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Through Its Bids And Awards Committee (bac), Invites Contractors To Submit Bids For The Following Contracts 1.1 Name Of Contract : Convergence And Special Support Program, Basic Infrastructure Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building (auditorium Building), Barangay Tambo, Lipa City, Batangas Contract Id No. : 24dd0293 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Two (2) Storey Auditorium (23.95m X 21.70m) Including Catwalk, Structural Works, Architectural Works, Electrical Works, Auxiliary Works And Mechanical Works Approved Budget For The Contract : Php 79,200,000.00 Source Of Funds : Sr2024-12-023371 Contract Duration : 300 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.2 Name Of Contract : Convergence And Special Support Program, Basic Infrastructure Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building, Lodlod Elementary School, Barangay Lodlod, Lipa City, Batangas Contract Id No. : 24dd0294 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 4sty16cl School Building (46.00m X 9.50m) Including Structural Works, Finishing Works, Electrical Works, Installation Of 1-75kva Transformer, Mechanical Works, Water Pumping System, Cctv System, Fire Alarm System, Auxiliary Works, Construction Of Power House (3.50m X 2.80m), Handwashing On Both Sides And Demolition Of Existing Structure Approved Budget For The Contract : Php 71,280,000.00 Source Of Funds : Sr2024-12-023371 Contract Duration : 225 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.3 Name Of Contract : Convergence And Special Support Program, Basic Infrastructure Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building, Inosloban Marawoy Integrated National High School, Barangay Marawoy, Lipa City, Batangas Contract Id No. : 24dd0295 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 4sty8cl School Building (237.00 Sq.m.) Including Structural Works, Finishing Works, Electrical Works, Installation Of 1-75kva Transformer, Mechanical Works, Water Pumping System, Cctv System, Fire Alarm System, Auxiliary Works, Construction Of Power House (3.50m X 2.80m), Handwashing On Both Sides And Demolition Of Existing Structure Approved Budget For The Contract : Php 51,480,000.00 Source Of Funds : Sr2024-12-023371 Contract Duration : 165 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.4 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Construction Of Slope Protection Along Catandala Bridge, Barangay Catandala, Ibaan, Batangas Contract Id No. : 25dd0229 Project Location : Ibaan, Batangas Scope Of Works : Construction Of 596.00 L.m. Revetment Using Gabions (right Side, Upstream) And 600.00 L.m. - 1220mm Dia. Rcpc Drainage Structures Approved Budget For The Contract : Php 96,500,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 244 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.5 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building (barangay Gym), Barangay Lumbang, Lipa City, Batangas Contract Id No. : 25dd0230 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Covered Gym (33.60m X 18.30m) Including Demolition, Structural Works, Architectural Works, Plumbing Works, Electrical Works, Mechanical Works, Auxiliary Works And Installation Of 3-75kva Transformer Approved Budget For The Contract : Php 44,550,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 240 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 25,000.00 1.6 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building At Tibig Elementary School, Barangay Tibig, Lipa City, Batangas Contract Id No. : 25dd0231 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 4sty8cl School Building (23.00m X 9.50m) Including Architectural Works, Plumbing Works, Electrical Works, Installation Of 1-50kva Transformer, Mechanical Works, Auxiliary Works, Cctv System And Demolition Approved Budget For The Contract : Php 37,620,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 180 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 25,000.00 1.7 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building At Barangay San Salvador, Lipa City Batangas Contract Id No. : 25dd0232 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Three (3) Storey Multi-purpose Building (22.80m X 9.40m) Including Structural Works, Architectural Works, Plumbing Works, Electrical Works, Installation Of 1-50kva Transformer, Mechanical Works, Airconditioning Unit, Water Pumping System And Demolition Approved Budget For The Contract : Php 29,700,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 210 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 1.8 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building (gym) At Barangay Sampaguita, Lipa City, Batangas Contract Id No. : 25dd0233 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Multi-purpose Building (35.00m X 19.97m) Including Structural Works, Architectural Works, Finishing Works, Plumbing Works, Playing Area, Electrical Works, Pole Mounted Distribution Transformer, Auxiliary Works, Mechanical Works, Ventilating System And Fire Extinguishers Approved Budget For The Contract : Php 29,700,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 180 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 1.9 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Buenventura-castillo Multi-purpose Building Including Site Facilities At Brgy. Palanca, San Jose, Batangas Contract Id No. : 25dd0234 Project Location : San Jose, Batangas Scope Of Works : Construction Of Gym (30.50m X 18.70m) Including Stage, Health Center, Structural Works, Plumbing Works, Electrical Works And Auxiliary Works Approved Budget For The Contract : Php 16,830,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 180 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 1.10 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building At Mabini Elementary School, Barangay Mabini, Lipa City, Batangas Contract Id No. : 25dd0235 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Three (3) Storey Admin Building (11.40m X 10.00m) Including Structural Works, Architectural Works, Plumbing Works, Electrical Works, Installation Of 1-37.5kva Transformer, Mechanical Works, Airconditioning Unit, Water Pumping System And Demolition Approved Budget For The Contract : Php 14,850,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 180 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 1.11 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Buildings/facilities, Rehabilitation Of Road Including Drainage Structure, Bagong Pook, Lipa City, Batangas Contract Id No. : 25dd0236 Project Location : Lipa City, Batangas Scope Of Works : Rehabilitation Of 160.00 L.m. Road With Width Of 3.00m And Thickness Of 0.20m; Rehabilitation Of 966.00 L.m. - 760mm Dia. Rcpc Drainage Structure Including Sidewalk, Manhole And Grouted Riprap Approved Budget For The Contract : Php 14,700,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 158 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 1.12 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building At Barangay Sto. Niño, Lipa City, Batangas Contract Id No. : 25dd0237 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Three (3) Storey Barangay Hall (10.90m X 7.90m) Including Demolition, Structural Works, Architectural Works, Plumbing Works, Mechanical Works, Electrical Works And Water Pumping System Approved Budget For The Contract : Php 11,266,200.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 150 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 1.13 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building, Barangay Galamay Amo, San Jose, Batangas Contract Id No. : 25dd0238 Project Location : San Jose, Batangas Scope Of Works : Construction Of Four (4) Storey Multi-purpose Building (8.40m X 7.00m) Including Demolition, Structural Works, Roofing Works, Sanitary Works, Finishing Works, Electrical Works And Mechanical Works Approved Budget For The Contract : Php 9,900,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 150 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 10,000.00 1.14 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Facilities At Leoncio L. Patulot Memorial School, Barangay Adya, Lipa City, Batangas Contract Id No. : 25dd0239 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 244.00 L.m. Perimeter Fence Including Handwashing Area, Concrete Pavement, Landscaping And Installation Of Cctv System Approved Budget For The Contract : Php 7,920,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 150 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 10,000.00 1.15 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Rehabilitation Of Multi-purpose Building (barangay Hall), Barangay Tangob, Padre Garcia, Batangas Contract Id No. : 25dd0240 Project Location : Padre Garcia, Batangas Scope Of Works : Rehabilitation Of Three (3) Storey Barangay Hall (13.43m X 5.52m) Including Roofing Works, Plumbing Works, Painting Works, Ceiling Works, Electrical Works, Mechanical Works, Replacement Of Tiles, Construction Of Stairs & Partition Wall, Water Pumping System And Transformer Approved Budget For The Contract : Php 6,435,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 90 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 10,000.00 1.16 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Rehabilitation Of Multi-purpose Building (barangay Hall), Barangay Poblacion 3, San Jose, Batangas Contract Id No. : 25dd0241 Project Location : San Jose, Batangas Scope Of Works : Rehabilitation Of Two (2) Storey Barangay Hall (20.96m X 7.60m) Including Structural Works, Partition Wall, Handwashing Area, Installation Of Sidings For Parking Area, Replacement Of Roofing Frame & Roofing Sheets, Architectural Works, Replacement Of Tiles, Repainting Of Wall, Ceiling Works, Electrical Works And Plumbing Works Approved Budget For The Contract : Php 4,950,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 90 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 5,000.00 1.17 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Improvement Of Multi-purpose Building (covered Court) At Barangay Balagtasin, San Jose, Batangas Contract Id No. : 25dd0242 Project Location : San Jose, Batangas Scope Of Works : Improvement Of Multi-purpose Building (22.15m X 31.83m) Including Structural Works, Plumbing Works, Electrical Works, Auxiliary Works, Cctv System, Installation Of 1-15kva Pole Mounted Distribution Transformer, Mechanial Works And Ventilating System Approved Budget For The Contract : Php 4,950,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 90 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 5,000.00 1.18 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Rehabilitation Of Multi-purpose Building At Don Luis, San Jose, Batangas Contract Id No. : 25dd0243 Project Location : San Jose, Batangas Scope Of Works : Rehabilitation Of Three (3) Storey Main Building (47.65m X 28.25m), Two (2) Storey Legislative Building (50.45m X 15.90m) And Two (2) Storey Archive Building (77.40m X 16.70m) Including Tile Works, Ceiling Works, Electrical Works, Plmbing Repair Works, Carpentry Works, Replacement Of Plumbing Fixtures And Replacement & Installation Of Doors & Windows Approved Budget For The Contract : Php 4,950,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 90 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 5,000.00 1.19 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Construction Of Drainage System At Barangay Anilao Labac, Lipa City, Batangas Contract Id No. : 25dd0244 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 260.50 L.m. - 760mm Dia. Rcpc Drainage Including Concrete Cover And Pccp Approved Budget For The Contract : Php 4,900,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 95 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 5,000.00 1.20 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Rehabilitation Of Drainage System At Barangay Poblacion B, Rosario, Batangas Contract Id No. : 25dd0245 Project Location : Rosario, Batangas Scope Of Works : Rehabilitation Of 151.30 L.m. - 610mm Dia. Rcpc On Both Sides Including Rehabilitation Of Pccp With Thickness Of 0.23m Approved Budget For The Contract : Php 3,960,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 69 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 5,000.00 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category And Classification As Indicated On The Above Table. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Annex Ii-1.1 B Section Ii And Iii Of Bidding Documents. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 4. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, And Inspect The Bidding Documents At Marawoy, Lipa City, Batangas During Weekdays From 08:00 A.m To 05:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On February 13, 2025 To March 04, 2025, 8:00 A.m.-5:00 P.m.; March 05, 2025, 8:00 A.m.-8:15 A.m. From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Pursuant To The Latest Guidelines Issued By The Gppb Amounting To The Responding Cost Of Bidding Documents Indicated On The Above Table. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Dpwh Website, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office Will Hold A Pre-bid Conference Physically And/or Through Live-streamed On Youtube On February 21, 2025 At 09:00 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Which Shall Be Open To Prospective Bidders. For Youtube Livestreaming, Https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq 7. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. For Bids To Be Submitted Electronically/online, The Following Procedures Should Be Observed Following Department Order No. 87, Series Of 2020. It Is Also Indicated In The Bds. 8. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_batangas4@dpwh.gov.ph For Electronic Submission On Or Before March 05, 2025 At 08:30 A.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. 9. Bid Opening Shall Be On March 05, 2025 At 08:30 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas And Through Live-streamed On Youtube (https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq). Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 10. "if At The Time Of The Post-qualification Procedure, The Bac Verifies That Any Of The Deficiencies Is Due To The Contractor’s Fault Or Negligence Pursuant To 34.3(b)(ii) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 (2016 Irr Of Ra 9184), The Procuring Entity Shall Disqualify The Contractor From The Award Without Any Right To Reimburse Fees And Incidental Cost Paid For The Procurement Of Infrastructure Contract Subject Of The Bid. " 11. The Dpwh-batangas Iv District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35 And Section 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. All Representatives Who Will Submit Their Bids Must Be Duly Authorized And Registered Liaison Officers As Reflected In The Contractor Registration Certificate (crc). Authorized Representatives Are Required To Present Their Company Ids And Government Id For Verification Purposes. 13. Please Be Informed That On The Day Of Bid Opening, The Approved Appointment Intended For Purchasing Bidding Documents Will Be Limited To Two (2) Prospective Bidders Only To Strictly Follow The Bid Opening Schedule. Secure The Approved Appointment To Dpwhbats4appointment@gmail.com 14. For Further Information, Please Refer To: Leo S. Matias Engineer Iii Bac, Chairperson Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Matias.leo@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com Queen Mariciel J. Sianquita Engineer Ii Head, Bac Secretariat Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Sianquita.queen_mariciel@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com 15. You May Visit The Following Websites: For Downloading Of Bidding Documents At Www.dpwh.gov.ph & Www.philgeps.gov.ph For Online Bid Submission At Electronicbids_batangas4@dpwh.gov.ph February 12, 2025 Approved By: Leo S. Matias Bac, Chairperson Noted By: Jehela G. Roxas District Engineer Date Of Publication: February 13, 2025 To February 19, 2025 Publication: Dpwh Website/ Philgeps
Closing Date5 Mar 2025
Tender AmountPHP 4.9 Million (USD 85.3 K)

Department Of Public Works And Highways - DPWH Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Invitation To Bid (cw-02-2025-010) 1. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Through Its Bids And Awards Committee (bac), Invites Contractors To Submit Bids For The Following Contracts 1.1 Name Of Contract : Convergence And Special Support Program, Basic Infrastructure Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building (auditorium Building), Barangay Tambo, Lipa City, Batangas Contract Id No. : 24dd0293 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Two (2) Storey Auditorium (23.95m X 21.70m) Including Catwalk, Structural Works, Architectural Works, Electrical Works, Auxiliary Works And Mechanical Works Approved Budget For The Contract : Php 79,200,000.00 Source Of Funds : Sr2024-12-023371 Contract Duration : 300 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.2 Name Of Contract : Convergence And Special Support Program, Basic Infrastructure Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building, Lodlod Elementary School, Barangay Lodlod, Lipa City, Batangas Contract Id No. : 24dd0294 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 4sty16cl School Building (46.00m X 9.50m) Including Structural Works, Finishing Works, Electrical Works, Installation Of 1-75kva Transformer, Mechanical Works, Water Pumping System, Cctv System, Fire Alarm System, Auxiliary Works, Construction Of Power House (3.50m X 2.80m), Handwashing On Both Sides And Demolition Of Existing Structure Approved Budget For The Contract : Php 71,280,000.00 Source Of Funds : Sr2024-12-023371 Contract Duration : 225 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.3 Name Of Contract : Convergence And Special Support Program, Basic Infrastructure Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building, Inosloban Marawoy Integrated National High School, Barangay Marawoy, Lipa City, Batangas Contract Id No. : 24dd0295 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 4sty8cl School Building (237.00 Sq.m.) Including Structural Works, Finishing Works, Electrical Works, Installation Of 1-75kva Transformer, Mechanical Works, Water Pumping System, Cctv System, Fire Alarm System, Auxiliary Works, Construction Of Power House (3.50m X 2.80m), Handwashing On Both Sides And Demolition Of Existing Structure Approved Budget For The Contract : Php 51,480,000.00 Source Of Funds : Sr2024-12-023371 Contract Duration : 165 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.4 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Construction Of Slope Protection Along Catandala Bridge, Barangay Catandala, Ibaan, Batangas Contract Id No. : 25dd0229 Project Location : Ibaan, Batangas Scope Of Works : Construction Of 596.00 L.m. Revetment Using Gabions (right Side, Upstream) And 600.00 L.m. - 1220mm Dia. Rcpc Drainage Structures Approved Budget For The Contract : Php 96,500,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 244 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 50,000.00 1.5 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building (barangay Gym), Barangay Lumbang, Lipa City, Batangas Contract Id No. : 25dd0230 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Covered Gym (33.60m X 18.30m) Including Demolition, Structural Works, Architectural Works, Plumbing Works, Electrical Works, Mechanical Works, Auxiliary Works And Installation Of 3-75kva Transformer Approved Budget For The Contract : Php 44,550,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 240 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 25,000.00 1.6 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building At Tibig Elementary School, Barangay Tibig, Lipa City, Batangas Contract Id No. : 25dd0231 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 4sty8cl School Building (23.00m X 9.50m) Including Architectural Works, Plumbing Works, Electrical Works, Installation Of 1-50kva Transformer, Mechanical Works, Auxiliary Works, Cctv System And Demolition Approved Budget For The Contract : Php 37,620,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 180 Calendar Days Size Range : Medium A License Category : B Amount Of Bidding Documents : Php 25,000.00 1.7 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building At Barangay San Salvador, Lipa City Batangas Contract Id No. : 25dd0232 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Three (3) Storey Multi-purpose Building (22.80m X 9.40m) Including Structural Works, Architectural Works, Plumbing Works, Electrical Works, Installation Of 1-50kva Transformer, Mechanical Works, Airconditioning Unit, Water Pumping System And Demolition Approved Budget For The Contract : Php 29,700,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 210 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 1.8 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building (gym) At Barangay Sampaguita, Lipa City, Batangas Contract Id No. : 25dd0233 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Multi-purpose Building (35.00m X 19.97m) Including Structural Works, Architectural Works, Finishing Works, Plumbing Works, Playing Area, Electrical Works, Pole Mounted Distribution Transformer, Auxiliary Works, Mechanical Works, Ventilating System And Fire Extinguishers Approved Budget For The Contract : Php 29,700,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 180 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 1.9 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Buenventura-castillo Multi-purpose Building Including Site Facilities At Brgy. Palanca, San Jose, Batangas Contract Id No. : 25dd0234 Project Location : San Jose, Batangas Scope Of Works : Construction Of Gym (30.50m X 18.70m) Including Stage, Health Center, Structural Works, Plumbing Works, Electrical Works And Auxiliary Works Approved Budget For The Contract : Php 16,830,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 180 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 1.10 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building At Mabini Elementary School, Barangay Mabini, Lipa City, Batangas Contract Id No. : 25dd0235 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Three (3) Storey Admin Building (11.40m X 10.00m) Including Structural Works, Architectural Works, Plumbing Works, Electrical Works, Installation Of 1-37.5kva Transformer, Mechanical Works, Airconditioning Unit, Water Pumping System And Demolition Approved Budget For The Contract : Php 14,850,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 180 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 1.11 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Access Roads And/or Bridges From The National Road/s Leading To Major/strategic Public Buildings/facilities, Rehabilitation Of Road Including Drainage Structure, Bagong Pook, Lipa City, Batangas Contract Id No. : 25dd0236 Project Location : Lipa City, Batangas Scope Of Works : Rehabilitation Of 160.00 L.m. Road With Width Of 3.00m And Thickness Of 0.20m; Rehabilitation Of 966.00 L.m. - 760mm Dia. Rcpc Drainage Structure Including Sidewalk, Manhole And Grouted Riprap Approved Budget For The Contract : Php 14,700,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 158 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 1.12 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building At Barangay Sto. Niño, Lipa City, Batangas Contract Id No. : 25dd0237 Project Location : Lipa City, Batangas Scope Of Works : Construction Of Three (3) Storey Barangay Hall (10.90m X 7.90m) Including Demolition, Structural Works, Architectural Works, Plumbing Works, Mechanical Works, Electrical Works And Water Pumping System Approved Budget For The Contract : Php 11,266,200.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 150 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 25,000.00 1.13 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Building, Barangay Galamay Amo, San Jose, Batangas Contract Id No. : 25dd0238 Project Location : San Jose, Batangas Scope Of Works : Construction Of Four (4) Storey Multi-purpose Building (8.40m X 7.00m) Including Demolition, Structural Works, Roofing Works, Sanitary Works, Finishing Works, Electrical Works And Mechanical Works Approved Budget For The Contract : Php 9,900,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 150 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 10,000.00 1.14 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Construction Of Multi-purpose Facilities At Leoncio L. Patulot Memorial School, Barangay Adya, Lipa City, Batangas Contract Id No. : 25dd0239 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 244.00 L.m. Perimeter Fence Including Handwashing Area, Concrete Pavement, Landscaping And Installation Of Cctv System Approved Budget For The Contract : Php 7,920,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 150 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 10,000.00 1.15 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Rehabilitation Of Multi-purpose Building (barangay Hall), Barangay Tangob, Padre Garcia, Batangas Contract Id No. : 25dd0240 Project Location : Padre Garcia, Batangas Scope Of Works : Rehabilitation Of Three (3) Storey Barangay Hall (13.43m X 5.52m) Including Roofing Works, Plumbing Works, Painting Works, Ceiling Works, Electrical Works, Mechanical Works, Replacement Of Tiles, Construction Of Stairs & Partition Wall, Water Pumping System And Transformer Approved Budget For The Contract : Php 6,435,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 90 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 10,000.00 1.16 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Rehabilitation Of Multi-purpose Building (barangay Hall), Barangay Poblacion 3, San Jose, Batangas Contract Id No. : 25dd0241 Project Location : San Jose, Batangas Scope Of Works : Rehabilitation Of Two (2) Storey Barangay Hall (20.96m X 7.60m) Including Structural Works, Partition Wall, Handwashing Area, Installation Of Sidings For Parking Area, Replacement Of Roofing Frame & Roofing Sheets, Architectural Works, Replacement Of Tiles, Repainting Of Wall, Ceiling Works, Electrical Works And Plumbing Works Approved Budget For The Contract : Php 4,950,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 90 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 5,000.00 1.17 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Improvement Of Multi-purpose Building (covered Court) At Barangay Balagtasin, San Jose, Batangas Contract Id No. : 25dd0242 Project Location : San Jose, Batangas Scope Of Works : Improvement Of Multi-purpose Building (22.15m X 31.83m) Including Structural Works, Plumbing Works, Electrical Works, Auxiliary Works, Cctv System, Installation Of 1-15kva Pole Mounted Distribution Transformer, Mechanial Works And Ventilating System Approved Budget For The Contract : Php 4,950,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 90 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 5,000.00 1.18 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Multi-purpose Buildings/ Facilities To Support Social Services, Rehabilitation Of Multi-purpose Building At Don Luis, San Jose, Batangas Contract Id No. : 25dd0243 Project Location : San Jose, Batangas Scope Of Works : Rehabilitation Of Three (3) Storey Main Building (47.65m X 28.25m), Two (2) Storey Legislative Building (50.45m X 15.90m) And Two (2) Storey Archive Building (77.40m X 16.70m) Including Tile Works, Ceiling Works, Electrical Works, Plmbing Repair Works, Carpentry Works, Replacement Of Plumbing Fixtures And Replacement & Installation Of Doors & Windows Approved Budget For The Contract : Php 4,950,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 90 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 5,000.00 1.19 Name Of Contract : Convergence And Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (sipag), Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Construction Of Drainage System At Barangay Anilao Labac, Lipa City, Batangas Contract Id No. : 25dd0244 Project Location : Lipa City, Batangas Scope Of Works : Construction Of 260.50 L.m. - 760mm Dia. Rcpc Drainage Including Concrete Cover And Pccp Approved Budget For The Contract : Php 4,900,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 95 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 5,000.00 1.20 Name Of Contract : Convergence And Special Support Program, Basic Infrastruture Program (bip), Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Rehabilitation Of Drainage System At Barangay Poblacion B, Rosario, Batangas Contract Id No. : 25dd0245 Project Location : Rosario, Batangas Scope Of Works : Rehabilitation Of 151.30 L.m. - 610mm Dia. Rcpc On Both Sides Including Rehabilitation Of Pccp With Thickness Of 0.23m Approved Budget For The Contract : Php 3,960,000.00 Source Of Funds : Fy 2025 General Appropriations Act (gaa) Contract Duration : 69 Calendar Days Size Range : Small B License Category : C & D Amount Of Bidding Documents : Php 5,000.00 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category And Classification As Indicated On The Above Table. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Annex Ii-1.1 B Section Ii And Iii Of Bidding Documents. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 4. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office, And Inspect The Bidding Documents At Marawoy, Lipa City, Batangas During Weekdays From 08:00 A.m To 05:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On February 13, 2025 To March 04, 2025, 8:00 A.m.-5:00 P.m.; March 05, 2025, 8:00 A.m.-8:15 A.m. From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Pursuant To The Latest Guidelines Issued By The Gppb Amounting To The Responding Cost Of Bidding Documents Indicated On The Above Table. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Dpwh Website, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Department Of Public Works And Highways (dpwh)-batangas Iv District Engineering Office Will Hold A Pre-bid Conference Physically And/or Through Live-streamed On Youtube On February 21, 2025 At 09:00 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas, Which Shall Be Open To Prospective Bidders. For Youtube Livestreaming, Https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq 7. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. For Bids To Be Submitted Electronically/online, The Following Procedures Should Be Observed Following Department Order No. 87, Series Of 2020. It Is Also Indicated In The Bds. 8. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_batangas4@dpwh.gov.ph For Electronic Submission On Or Before March 05, 2025 At 08:30 A.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. 9. Bid Opening Shall Be On March 05, 2025 At 08:30 A.m. At Bidding Room, Dpwh-batangas Iv District Engineering Office, Marawoy, Lipa City, Batangas And Through Live-streamed On Youtube (https://youtube.com/@batangas_4th_deo?si=lsq1bcqacx-uowzq). Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 10. "if At The Time Of The Post-qualification Procedure, The Bac Verifies That Any Of The Deficiencies Is Due To The Contractor’s Fault Or Negligence Pursuant To 34.3(b)(ii) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 (2016 Irr Of Ra 9184), The Procuring Entity Shall Disqualify The Contractor From The Award Without Any Right To Reimburse Fees And Incidental Cost Paid For The Procurement Of Infrastructure Contract Subject Of The Bid. " 11. The Dpwh-batangas Iv District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35 And Section 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. All Representatives Who Will Submit Their Bids Must Be Duly Authorized And Registered Liaison Officers As Reflected In The Contractor Registration Certificate (crc). Authorized Representatives Are Required To Present Their Company Ids And Government Id For Verification Purposes. 13. Please Be Informed That On The Day Of Bid Opening, The Approved Appointment Intended For Purchasing Bidding Documents Will Be Limited To Two (2) Prospective Bidders Only To Strictly Follow The Bid Opening Schedule. Secure The Approved Appointment To Dpwhbats4appointment@gmail.com 14. For Further Information, Please Refer To: Leo S. Matias Engineer Iii Bac, Chairperson Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Matias.leo@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com Queen Mariciel J. Sianquita Engineer Ii Head, Bac Secretariat Department Of Public Works And Highways Batangas Iv District Engineering Office Brgy. Marawoy, Lipa City, Batangas Telephone No.: (043) 233-05-24 Email Address: Sianquita.queen_mariciel@dpwh.gov.ph/ Dpwhbatangas4bac@gmail.com 15. You May Visit The Following Websites: For Downloading Of Bidding Documents At Www.dpwh.gov.ph & Www.philgeps.gov.ph For Online Bid Submission At Electronicbids_batangas4@dpwh.gov.ph February 12, 2025 Approved By: Leo S. Matias Bac, Chairperson Noted By: Jehela G. Roxas District Engineer Date Of Publication: February 13, 2025 To February 19, 2025 Publication: Dpwh Website/ Philgeps
Closing Date5 Mar 2025
Tender AmountPHP 14.7 Million (USD 253.4 K)

Don Emilio Del Valle Memorial Hospital Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Subject : Design And Build Of Dedvmh Ob Building Location : Dedvmh Compound, Bood, Ubay, Bohol Terms Of Reference I. Background Don Emilio Del Valle Memorial Hospital (dedvmh) Is A Licensed Level 2 General Hospital Located In Ubay, Bohol With 200 Authorized Bed Capacity Which Aims To Provide Highly Specialized Quality Healthcare Services To All Where Human Dignity Is Valued And Respected By Competent And Committed Personnel. In Accordance With The Provisions Of And Related Issuances Of Doh Administrative Order No. 2019-0056 Increasing The Bed Capacity Of Dedvmh From 50 Beds To 300 Beds And R.a. No. 11223, Or The “universal Health Care Act”, The Hospital Shall Provide Promotive, Preventive, Diagnostic, Curative, And Palliative Care Services, And Research, Professional Teaching And Training Programs And Shall Be Fully Equipped With The State-of-the Art Equipment And Facilities, Complemented By Adequately Trained And Competent Human Resources For Health Appropriate For A Licensed And Accredited Tertiary General Hospital. Dedvmh Shall Strengthen Its Existing Basic Services, And Aim For The Improvement Of Its Service Capability And Capacity Serving As Referral Hospital In The Northeastern Section Of The Bohol Province, Complementing Local Health Systems And Providers Of Municipalities In The Area. In Order To Fulfill This Mandate, Dedvmh Is Upgrading Its Services To Become A Level Iii Hospital To Provide Better And Quality Healthcare Services Especially In The Northeastern Part Of Bohol, Its Catchment Areas And Nearby Provinces. The Increase In The Bed Capacity And Expansion Of Services And Capability Are Consistent With The Dedvmh’s Hospital Development Plan (hdp) And Philippine Health Facility Development Plan (phfdp) 2020-2040. Ii. Objectives The Purpose Of This Project Is To Repair And Expand The Existing Ob Building To Provide Patients And Healthcare Workers With A More Spacious And Comfortable Area By Improving Its Ventilation, Air Conditioning, Lighting And Ensuring That The Size, Layout, And Functions Of The Structure Meet Their Diverse Healthcare Needs. The Design Must Also Conform To The Standards Of Set By In Accordance To The Manual On Technical Guidelines For Hospitals Planning And Design (level 3) And Doh Green And Safe Health Facilities Manual To Develop Climate Smart Health Facilities That Address And Adapt To The Impacts On The Environment. The Winning Bidder Shall Design For This Project With The Approval Of The Medical Center Including The Approved Detailed Estimates, Bill Of Quantities, Technical Specifications, And Methodology Of Construction And Scope Of Works Of The Project. Iii. Conceptual Design The Design Concept Of The Project Was Governed By The Planning And Design Standards Of Level 3 Service Capability Hospital Facility As Prescribed By The Latest Requirements Of The Department Of Health And Other Concerned Agencies. Building Design Shall Conform To The Provisions Of The National Building Code Of The Philippines (pd 1096), Accessibility Law (bp 344), Architecture Law (ra 9266), National Structural Code Of The Philippines, Electrical Engineering Law (ra 7920), Mechanical Engineering Law (ra 5336), Plumbing Code (ra 1378, 1993-1994 Revisions), Fire Code (ra 9514) And Other Laws And Regulations Covering Environmental Concerns And Local Ordinances And Regulations. The As-built Plan And Proposed Schematic Lay-out/call-out Will Be Provided As Basis Reference In The Development Of Preliminary Conceptual Design Plans To Be Submitted As Part Of The Technical Proposal. However, It Is The Responsibility Of The Bidder To Verify Actual Site Conditions And Dimensions. The Preliminary Conceptual Design Plans And Perspectives Shall Be Included Construed Part Of The Technical Proposal As Follows: Preliminary Conceptual Design Plans Required Specified Degree Of Details 1. Schematic Floor Plans: A. Ground Floor B. Second Floor C. Third Floor (expansion) D. Roof Deck All Schematic Plans Shall Be At Least A3 Size Paper And Shall Meet The Minimum Space Requirements And Planning/design Guidelines Of Level 3 Hospital For: - Delivery Complex - Ob-gyne Emergency Department - Neonatal Intensive Care Unit (nicu) - Chief Of Medical Professional Staff (cmps) Office - Ob-gyne Wards / Recovery Rooms - Conference Room / Training Rooms - Offices - Open Space For Mechanical Outdoor Units And Equipment Preliminary Conceptual Design Plans Required Specified Degree Of Details A. Aerial Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. B. Man’s Eye / Worm’s Eye Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. C. Front Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. D. Rear Perspective View In Conformance With The Preliminary Conceptual Plans And At Least 3d Rendered. E. Left & Right-side Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered F. Longitudinal And Transverse Section Plans At Least One Longitudinal And One Transverse Section Plans In At Least A3 Size Paper The Conceptualization Of The Design Including Its Specifications And Space Requirements Shall Complement And/or Supplement With The Existing Site Conditions And Specification Of The Existing Ob-gyne Building. Proponent’s Input, Suggestion And Recommendations With Regard To The Identification Of The Scope Or Physical Components And Structures, Specific Outputs And Requirements And Proposed Construction Methods Shall Be Considered. Iv. Performance Specifications And Parameters Site And Space Planning Were Governed By The Standards, Rules And Regulations On The Design Of Level 3 Hospitals As Prescribed By The Department Of Health And Other Concerned Agencies. Building Design Shall Conform To The Provisions Of The National Building Code Of The Philippines (pd 1096), Accessibility Law (bp 344), Architectural Law (ra 9266), Civil Engineering Law (ra 544), National Structural Code Of The Philippines, Electrical Engineering Law (ra 7920), Mechanical Engineering Law (ra5336), Plumbing Code (ra 1378, 1993-1994 Revisions), Fire Code (ra 9514) And Other Laws And Regulations Covering Environmental Concerns And Local Ordinances And Regulations. A. Pre-detailed Design 1. Engineering Surveys And Investigations 1.1 Surveys And Investigations Of The Site Includes Elevations And Contours (at 0.5m Interval), Soil Tests, Location, Dimension, Floor Elevations And Other Pertinent Data On Existing Buildings And Improvements (roads, Parking Areas, Mature Trees) And Existing Utility Lines (e.g. Water, Power, Telephone). 2. Preliminary Conceptual Design Plans/perspective 2.1 Preparation Of The Following Drawings For Design Development Based On The As Built Plan And Schematic Lay-out/call-out Prepared By The Procuring Entity. Please Refer To Section Iii. Conceptual Design. B. Detailed Design Preparation Of Final Design Concept And Detailed Architecture And Engineering Design Shall Be In Accordance With The Schematic Plans For Hospital Building And Design Conceptualization Duly Approved By The Dedvmh. In Determining The Final Design Concept And Detailed Architecture And Engineering Design, The Implementing Unit Together With The Design And Build Contractor Shall Initiate The Coordination Meeting With The Concerned Stakeholders In The Following Schedule: First Session - The Design And Build Contractor Shall Present The First Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents Within Ten (10) Calendar Days From The Effectivity Of Notice To Proceed Second Session - The Design And Build Contractor Shall Present The First Revision Of Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents, If There Any, Within Twenty (20) Calendar Days From The Effectivity Of Notice To Proceed Third Session - The Design And Build Contractor Shall Present The Second Revision Of Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents, If There Any, Within Thirty (30) Calendar Days From The Effectivity Of Notice To Proceed Upon Approval Of The Final Schematic Plan And Design Concept, The Design And Build Contractor Shall Then Proceed For The Design Phase, Enumerated As Follows: 1. Preparation Of The Following Detailed Design Drawings Of Entire Building (see Doh Checklist Of Drawings Requirements) Based On The Design Development Drawings And Design Parameters Including Any Revisions And Refinements As Approved And Required By The Dedvmh: A. Detailed Architectural Plans (refer To Checklist Of Drawings Requirements And Design Parameters). B. Detailed Structural Plans (refer To Checklist Of Drawings Requirements And Design Parameters). C. Detailed Electrical Plans (refer To Checklist Of Drawings Requirements And Design Parameters). D. Detailed Storm Drain, Sanitary And Plumbing Plans (refer To Checklist Of Drawings Requirements And Design Parameters). E. Detailed Mechanical Plans (refer To Checklist Of Drawings Requirements And Design Parameters). F. Structural Computations, Including Soil Boring Test Results And Seismic Analysis And Electrical Design Computations. G. General Notes And Technical Specifications Describing Type And Quality Of Materials And Equipment To Be Used, Manner Of Construction And The General Conditions Under Which The Project Is To Be Constructed. H. Detailed Cost Estimates, Detailed Bill Of Qualities, Bill Of Quantities, And Program Of Works Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals. I. Summary Of Works J. All Design Output Shall Include The Following: Particulars Design Required Output Hard Copy Printed In Standard Size Paper 40 X 30 Printed And Hardbound Catalog For All Perspective Views, Architectural Finishes, Electrical Fixtures, Sanitary/plumbing Fixtures Utilizing Standard A4 Size Photo Paper Electronic Copy Electronic Copies In Standard Formats: - Designplansfile.pdf; - Designplanscadfile.dwg; - Design3dfile.skp/dwg/etc; - Powerpointpresentation.ppt; - 3d Animations (walkthrough.mp4/avi/mov/etc.) Design And Build Contractor Shall Compile All The Files And To Be Stored In 1tb External Drive Fourth And Final Session - The Design And Build Contractor Shall Submit The Completed Detailed Design Drawings Of The Entire Building, Within Sixty (60) Calendar Days From The Effectivity Of Notice To Proceed. C. Green Building 1. Design Development Shall Consider At Least Basic Requirements For Green Building Applied To Hospital Facilities In Building Component Systems Such As Architectural, Structural, Electrical, Mechanical, And Sanitary. D. 3d Animation And Walkthrough Presentations Designer Shall Prepare A 3d Walkthrough, That Is, Taking A Virtual Tour Of The Proposed Project/structure In Any Design Platform. It Shall Be Produced From Digital 3d Models That Have Been Visualized To A Photo-realistic Standard That Will Showcase All The Design Elements, Both Externally And Internally Of A Property Development And Its Spaces. Minimum Expected Output Shall Include But Not Limited To: - 3d Walkthrough Presentation That Will Show From The Main Entrance Of The Hospital Compound, Going Through The Site Where The Project Is To Be Located. From The Site, It Should Walk Through The Main Facade And Entrance Of The Ground Floor Of The Building Up To The Third Floor Showing All The Respective Floors, Its Lobbies, Hallways, Rooms And Other Support Facilities. - In Addition, The 3d Walkthrough Presentation Shall Include The Exterior Views / Facade Of The Building With Its Adjoining Structures. E. Pre-construction Pre-construction Meeting Shall Be Scheduled On The Next Day That The Completed Detailed Design Drawings Are Submitted. Key Stakeholders—including The Dedvmh, And The Design And Build Contractor (architects, Engineers, Consultants, And Contractor—must Attend). The Meeting Will Serve To:  Review And Confirm The Submitted Design Documents.  Ensure That The Designs Comply With The Project’s Specifications, Budget, And Schedule.  Address Any Necessary Adjustments Or Clarifications Before Construction Commences. After The Pre-construction Meeting, The Design And Build Contractor Shall Finalize And Submit The Following Documents For The Approval Of Dedvmh: 1. Duly Signed Construction Schedule And S-curve 2. Duly Signed Manpower Schedule 3. Duly Signed Construction Methods 4. Duly Signed Pert Cpm And Ghannt Chart Showing Per Item Of Works Of Individual Projects 5. Log Book This Submission Should Encompass All Architectural, Structural, And Mepfs Plans, Specifications, And Any Amendments From The Meeting. These Documents Will Form The Basis For Construction. Upon The Dedvmh’s Approval Of The Submitted Construction Documents, A Notice To Commence Will Be Issued. Construction Activities May Only Begin Following The Issuance Of This Notice. F. Construction As A Rule, Contract Implementation Guidelines For Procurement Of Infrastructure Projects Shall Comply With Annex “e” And Guidelines For The Implementation Of Contracts For Design And Build Infrastructure Projects Shall Comply With Annex “g” Of Irr, Ra 9184. The Following Provisions Shall Supplement These Procedures: 1. Scope Of Works: Supply Of Materials, Labor, Tools And Equipment Necessary To Complete The Execution Of Architectural, Structural And Electrical And Mechanical Works. Includes All Other Necessary Works That Complete For The Fully Operational Building But Limited To The Following Work Items; A) Site Works - Provision Of Temporary Perimeter Fence - Demolition Of Existing Building/structure, Includes Hauling Of Debris Within The Hospital Compound - All Materials, Debris, Etc. Identified As Garbage As Directed By Hospital Management Shall Be Disposed Off-site - Excavation And Grading Provide Necessary Soil Protection On Excavated Portion. - Soil Poisoning And Termite Control B) Foundation Works - Foundation Of The Entire Building Includes Column Footings, Wall Footings And Other Sub-structures As Specified In The Approved Plan. C) Concrete Works - From Foundation Up To Roof Deck (entire Building); Includes Slabs, Beams And Girders Of Up To Roof Deck D) Architectural Works I) Exterior Walls – All Exterior Wall At From Ground Floor Up To Roof Deck Including Plastering Ii) Interior Walls – All Interior Wall At Functional Floors Complete With Wall Finishes Iii) Ceiling Works – All Functional Floors As Determined By Procuring Entity Iv) Floor Finish – All Functional Floors As Determined By Procuring Entity V) Doors And Windows– All Exterior Doors And Windows As Per Plan And Specifications Vi) Doors And Windows – All Functional Areas As Determined By Procuring Entity Vii) Painting Works – All Exterior Walls; Interior Walls At Functional Areas Viii) Façade And Signage E) Electrical Works I) Roughing-ins – All Necessary Roughing-ins Including Riser Conduits From Ground Floor To Roof Deck Including Cable Tray Ii) Panel Boards And Breakers – Main Breaker; Panel Boards From Ground Floor To Third Floor Iii) Wires And Cables – All Wires And Cables At Functional Floors Includes Installation Of Main Feeder Lines Tap To Existing Power House Including Connections To All Panel Board And Breakers Iv) Electrical Fixtures And Devices – All Fixtures And Wiring Devices At Functional Areas. Provision Of Usb Ready Outlets To Every Rooms. V) Application Of Electrical Connections/permits Shall Be Shouldered By The Contractor F) Mechanical Works I) Installation Of Automatic Fire Protection System At Functional Areas Ii) Installation Air Condition Units At Functional Areas As Determined By Professional Mechanical Engineer G) Plumbing And Sanitary Works I) Installation Of Plumbing And Sanitary System At Functional Areas, Includes; - Water Supply Pipelines - Waste Water Pipelines - Plumbing Fixtures And Accessories - Necessary Riser Pipes - Fiber Glass Pressure Tank - Drainage System I) Electronics / Auxiliary Works - At Functional Areas: Nurse Call Systems, Public Address / Voice Evacuation Systems (paging Systems), Cctv, And Or Integrated Information And Communication Systems, Installation Of Fire Detection And Alarm System (fdas) At Functional Floors J) Other Works 1. No Works Shall Commence Unless The Contractor Has Submitted The Prescribed Documentary Requirements And The Dedvmh Has Given Written Approval. Work Execution Shall Be In Accordance With Reviewed And Approved Documents. The Contractor Shall Process The Approval Of Permit To Construct (ptc) Form Doh – Central Visayas Regional Office, Cebu City. In Addition To, The Contractor Shall Process The All-necessary Permits (i.e., Building Permit, Occupancy Permit And All Prerequisite Permits) Chargeable Against The Project. 2. The Contractor Shall Be Responsible For Obtaining All Necessary Information As To Risks, Contingencies And Other Circumstances Which May Affect The Works And Shall Prepare And Submit All Necessary Documents Specified By The Concerned Building Officials To Meet All Regulatory Approvals As Specified In The Contract Documents. 3. Any Errors, Omissions, Inconsistencies, Inadequacies Or Failure Submitted By The Contractor That Do Not Comply With The Requirements Shall Be Rectified, Resubmitted And Reviewed At The Contractor’s Cost. If The Contractor Wishes To Modify And Design Or Document Which Has Been Previously Submitted, Reviewed And Approved, The Contractor Shall Notify The Hospital Management And The Procuring Entity Within A Reasonable Period Of Time And Shall Shoulder The Cost Of Such Changes. 4. As A Rule, Changes In Design And Construction Requirements Shall Be Limited Only To Those That Have Not Been Anticipated In The Contract Documents Prior To Contract Signing And Approval. The Following Guidelines Shall Govern Approval For Change Or Variation Orders: A. Change Orders Resulting From Design Errors, Omissions Or Non-conformance With The Performance Specifications And Parameters And The Contract Documents By The Contractor Shall Be Implemented By The Contractor At No Additional Cost To The Procuring Entity. B. Provided That The Contractor Suffers Delay And/or Incurs Costs Due To Changes Or Errors In The Dedvmh Performance Specifications And Parameters, The Contractor Shall Be Entitled To Either One Of The Following: 1. An Extension Of Time For Any Such Delays Under Section 10 Of Annex “e” Of Irr (ra 9184); Or 2. Payment For Such Costs As Specified In The Contract Documents, Provided, That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. C. The Contract Documents Shall Include The Manner And Schedule Of Payment Specifying The Estimated Contract Amount And Installments In Which The Contract Will Be Paid. D. The Contractor Shall Be Entitled To Advance Payment Subject To The Provisions Of Section 4 Of Annex “e”, Irr (ra 9184). E. The Dedvmh Shall Define The Quality Control Procedures For The Design And Construction In Accordance With The Doh Guidelines And Shall Issue The Proper Certificates Of Acceptance For Sections Of The Works Or Whole Of The Works As Provided For In The Contract Documents. F. The Contractor Shall Provide All Necessary Equipment, Personnel, Instruments, Documents And Others To Carry Out Specified Tests. G. This Design And Build Projects Shall Have A Minimum Defects Liability Period Of One (1) Year After Contract Completion Or As Provided For In The Contract Documents. This Is Without Prejudice To The Liabilities Imposed Upon The Engineer/architect Who Drew Up The Plans And Specification For Building Sanctioned Under Section 1723 Of The New Civil Code Of The Philippines. H. The Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Of 15 Years For Permanent Structures/buildings As Specified In Section 62.2.3.2 Of The Irr (ra 9184) V. Implementation Arrangement A. Reporting Protocol Contact Person I. Nelson A. Elle, Md, Dtmph, Mscih Office Of The Medical Center Chief Ii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Ii. Joan V. Kadusale, Cpa Supervising Administrative Officer Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Iii. Leomel R. Labitad, Ce Engineer Iii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Iv. Allana Jane C. Dacoylo, Uap Architect Ii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Vi. Elegibility Requirements A. Basic 1. The Eligibility Requirements For Design And Build Scheme Shall Comply With The Applicable Provisions Of Sections 23-24 Of Irr Of Ra 9184. 2. A Modified Set Of Requirements Integrating Eligibility Documents And Criteria For Infrastructure Project And Consulting Services Shall Be Adopted In Accordance With Annex G - Guidelines For The Procurement And Implementation Of Contracts For Design And Build Infrastructure Projects Of Irr Of Ra 9184. 3. Pcab Classification Under “general Building”; License Category B “medium A” 4. Contractor Must Have Similar Project In The Amount At Least Fifty Percent (50%) Of The Abc Within The Past Five (5) Years. 5. Similar Projects With The Following But Not Limited To:  Medium-rise Hospital Facility Project, Must Have Ongoing Or Completed Project At Least 6-storey Building.  Supply And Installation Of Hvac System. B. Specialized 1. For Pre-design And Design Phase Of The Contract, The Bidder Shall Comply The Following Professionals To Be Assigned: I. Project Coordinator • Licensed Architect Or Engineer With At Least 15 Years’ Experience In Hospital-related Project Management. • Superb Oral And Written Communication Skills, Organization Skills And Excellent Administrative Abilities. Ii. Architect • The Architect Must Be A Registered And Licensed Architects (rla), With An Updated Professional Identification Card And Must Be A Member In Good Standing Of The Integrated And Accredited Professional Organization Of Architects (iapoa). • Should Have At Least 10 Years’ Experience In Hospital-related Project. Iii. Structural Engineer • Licensed Structural Engineer With At Least 10 Years’ Experience In Hospital-related Project Management. • Must Be A Member Of Accredited Structural Engineer Associations. Iv. Mechanical Engineer • Licensed Professional Mechanical Engineer With At Least 10 Years’ Experience In Hospital-related Project. V. Electrical Engineer • Licensed Professional Electrical Engineer With At Least 10 Years’ Experience In Hospital-related Project. Vi. Sanitary Engineer • Licensed Sanitary Engineer With At Least 10 Years’ Experience In Hospital-related Project. Vii. Cad Operator (at Least One For Architecture And One For Each Engineering Specialty) • At Least Bachelor’s Degree In Architecture, Engineering, And/or Industrial Technology Major In Drafting • Proficient In Autocad Software Viii. Administrative Support Staff 2. For The Construction Phase Of The Contract, The Contractor Shall Assign Technical Personnel With The Following Qualification: I. Project Manager • Licensed Architect Or Engineer With At Least 10 Years’ Experience In Medium Rise Hospital-related Project • Superb Oral And Written Communication Skills, Organization Skills And Excellent Administrative Abilities. Ii. Project Engineer (civil) • Licensed Civil Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project Iii. Project Engineer (mechanical) • Registered Mechanical Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project Iv. Project Engineer (electrical) • Registered Electrical Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project V. Cad Operator (at Least One For Architecture And One For Each Engineering Specialty) • At Least Bachelor’s Degree In Architecture, Engineering, And/or Industrial Technology Major In Drafting • Proficient In Autocad Software Vi. General Foreman (all Discipline) • With At Least 5 Years’ Experience As General Foreman In Medium Rise Project Vii. Skilled Workers (all Discipline) • With At Least 3 Years’ Experience In Medium Rise Project Viii. Administrative Support Staff Vii. Approved Budget Cost Project Description Approved Budget Cost Design Of Dedvmh Ob Building (shall Not Exceed Php 3,500,000.00 Plus 6% Of Excess Of Php 50,000,000.00) 5%-6% Of Abc Construction Of Dedvmh Ob Building 94%-95% Of Abc Total Abc Php 65,000,000.00 The Approved Budget For The Design-build Contract Is Sixty-five Million Pesos (php 65,000,000.00) Which Is Identified As The Design And Build Of Don Emilio Del Valle Memorial Hospital – Ob Building. Detailed Architectural And Engineering Design Services Shall Not Exceed Three Million Five Hundred Thousand Pesos (php 3,500,000.00) Plus Six Percent (6%) Of Excess Of Fifty Million Pesos (php 50,000.000.00) (as Per Prboa Resolution No. 6 Series Of 2016 - Architect’s Guidelines For Standards Of Professional Practice Compliances On The Methods Of Compensation And Schedule Of Fees, Pursuant To Republic Act No.9266, Published In The Official Gazette, September 19, 2016 Issue) Of The Entire Building Inclusive Of Taxes And Duties. Proposals Exceeding The Approved Budget Shall Be Automatically Rejected. Viii. Estimated Duration Of Engagement The Duration Of The Contract Is Three Hundred Sixty (360) Calendar Days From The Design Phase Up To The Completion Of The Project From The Date Of Effectivity: I. Pre-design And Design Phase - 60 Calendar Days Ii. Construction Phase - 300 Calendar Days Ix. Minimum Requirements For Construction Safety And Health A. General Requirements No Contractor Or Subcontractor Shall Require Any Employee To Work In Surroundings Or Under Working Conditions That Are Unsanitary, Hazardous, Or Dangerous To His Health Or Safety. In Order To Meet This General Requirement, The Contractor Must: 1. Initiate And Maintain Programs (written Or Otherwise) To Comply With This General Requirement. 2. Provide Frequent And Regular Inspections Of The Job Sites By Competent Persons.  Competent Person Means One Who Is Capable Of Identifying Existing And Predictable Hazards In The Surroundings Or Working Conditions Which Are Unsanitary, Hazardous, Or Dangerous To Employees, And Who Has Authorization To Prompt Corrective Measures To Eliminate Them. 3. Prohibit The Use Of Any Machinery, Tool, Material, Or Equipment That Is Not In Compliance With Applicable Requirements. 4. Permit Only Those Employees Adequately Trained To Operate Machinery Or Equipment. 5. Provide Training For All Employees In:  Recognition And Avoidance Of Unsafe Conditions  Workplace Safety And Health Requirements  Applicable Hazards, Safe Handling, And Personal Protective Equipment Necessary For Handling Poisons, Caustics, Flammables, And Other Harmful Substances Relevant To Their Job Duties.  Specific Hazards And Procedures For Entering Confined Spaces If Applicable 6. Provide Provisions For Medical Care And First Aid. 7. Develop An Effective Fire Protection And Prevention Plan. 8. Ensure Appropriate Housekeeping Measures Including Clear Walkways And Removal Of Combustible Scrap And Debris. 9. Require The Wearing Of Appropriate Personal Protective Equipment Such As Hard Hats, Safety Glasses, Steel Toe Shoes, Or Other Appropriate Protective Equipment In All Operations Where There Is An Exposure To Hazardous Conditions. 10. Develop An Emergency Action Plan Covering Designated Actions Employers And Employees Must Take To Ensure Employees Safety From Fire And Other Emergency.  Plan Must Be In Writing For Employers With Greater Than 10 Employees  All Employees Must Be Trained Upon Initial Assignment On The Parts Of The Plan The Employee Needs To Know In The Event Of An Emergency. 11. Provide Access To Hand Washing Facilities, Toilets, And An Adequate Supply Of Drinking Water. 12. Provide Safety And Health Signs That Are Clearly Visible To Construction Workers And Public. 13. Conduct Regular Safety Meetings. Source: Colorado State University Occupational Health And Safety Section Department Of Environmental Health Fort Collins, Colorado X. Design Technical Specifications And Requirements The Bidder Shall Submit The Following Design Deliverables In Accordance With The Design Specifications, Parameters And Drawing Checklist But Not Limited To The Following: Activity Reports And Documents Required 1. Pre-design Phase 1.1 Geotechnical Investigation Five (5) Sets Duly Signed And Seal Soil Analysis And Investigation Report In Hard Bound (refer To Geotechnical Investigation Specification And Parameters) 1.2 Structural Analysis And Design Five (5) Sets Duly Signed And Seal Structural Analysis And Design Report In Hard Bound Including The Executable E-files (staad/etabs,etc.) Five (5) Sets Duly Signed And Seal Structural Specifications In Hard Bound (refer To Structural Analysis And Design Specification And Parameters) 1.3 Master Site Development Plans And Conceptual 3d Design Five (5) Sets Duly Signed And Seal Master Site Development Plans In Hard Copy (at Least 20 X 30 Paper Size In Desired Minimum Scale) And Softcopy (editable File.dwg And 3d Model.skp/cad/etc) Powerpoint Presentation And/or Walkthrough Presentation 2. Design Phase 2.1 Detailed Architecture And Engineering Designs/plans Including Applicable And/or Approved Revisions To The Satisfaction Of The Procuring Entity Five (5) Sets Duly Signed And Seal Detailed Architecture And Engineering Plans/drawing In Hard Copy (at Least 20 X 30 Paper Size In Desired Minimum Scale) And Softcopy (editable File.dwg And 3d Model.skp/cad/etc) (refer To Design Parameters And Drawing Checklists) 2.2 Construction Technical Specifications Five (5) Sets Duly Signed And Seal Construction Technical Specifications In Hard Bound Xi. Space Requirements General Floors:  Ceiling Height Should Be At Least Three Meters Clear Height For 2nd Floor And Up. Ground Floor Lobby Must Be Of Higher Ceiling.  Provision Of Utility Room Enough To House Trolley And Dirty Utilities With Floor Drain  All Floors (except For Third Floor To Roof Deck) Shall Have Direct Access To Ramp  Both Stairs Are For Service And Emergency Use  External Window At Second Floor And Up Shall Be Of Awning Type.  Provision Of Electrical Room  Ramp For Wheelchair Access (with A Clear Width Of At Least 1.22 M. 4 Ft.).  Minimum Of Two (2) Exits, Remote From Each Other, For Each Floor Of The Building.  Exits Restricted To The Following Types: Door Leading Directly Outside The Building, Interior Stair, Ramp And Exterior Stair.  Exits Terminate Directly At Open Space To The Outside Of The Building. General / Common Areas • Staff’s Dressing, Lockers, Toilet And Bath - This Room/space Is Equipped With Secure Lockers, Private Dressing Rooms, And Accessible Toilets And Showers To Support Hygiene And Comfort For Male And Female Staff. This Space, With Its Own Separate Staff Entrance, Allows For Efficient Staff Flow And Infection Control, Particularly Important In Sensitive Areas Like The Delivery Complex And Nicu. - Planning Relationships: A. Adjacent To Staff’s Lounge B. Within The Delivery Complex And Nicu - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. • Staff’s Hallway - A Corridor Within The Delivery Complex And Nicu That Ensures A Minimum Clear Width Of 1.83 Meters To Facilitate Smooth, Unobstructed Movement Of Staff And Equipment, Enhancing Safety And Efficiency In High-traffic Medical Areas. Closed-circuit Television Cctv Shall Be Installed At The Hallway Of This Floor And At Least Two Views Or Angles Of Cctv Or More As Required With Central Monitor At Nurse Station. - Lighting System: A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Auxiliary System: C. Provide And Install The Following Auxiliary System: • Communication System  Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: D. Provide At Least Six (6) Units Smoke Detector. • Patient’s Dressing/changing Rooms - Positioned Near The Entrance For Convenient Access, This Compact Room Accommodates Only One Bed Or Stretcher, Designed To Serve Both Ambulatory Patients And Those On Stretchers. With Separate Entrances To The Emergency Department And The Delivery Complex's Sterile Hallway, It Ensures Asepsis Despite Limited Space. - Planning Relationships: A. Next To Main Entrance B. Adjacent To Delivery Complex And Ob-gyne Emergency Department C. Close To Waiting Area And Comfort Room - Lighting System: D. For General Illumination, Provide At Least 250 Lux. - Power System: E. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: F. Provide At Least Six (6) Units Smoke Detector. - Ventilation System: G. Provide At Least One (1) Unit Orbit Fan. • Common Patient And Staff Hallway (sterile-ground Floor, Delivery & Nicu Suite) - A Well-ventilated Passageway With Ambient Lighting And Centralized Air Conditioning, Ensuring A Controlled Environment That Supports Both Infection Control And Staff Efficiency. The Hallway, With A Clear Width Of 2.44 Meters, Facilitates Smooth Movement While Maintaining Asepsis And A Comfortable Atmosphere For Patients And Medical Personnel. Closed-circuit Television Cctv Shall Be Installed At The Hallway Of This Floor And At Least Two Views Or Angles Of Cctv Or More As Required With Central Monitor At Nurse Station. - Lighting System: A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least Six (6) Units Smoke Detector. - Ventilation System: D. Provide At Least One (1) Unit Orbit Fan. • Common Patient And Staff Hallway (non-sterile-second Floor, Ob Wards/recovery Rooms) - A Well-ventilated Passageway With Ambient Lighting, Ensuring A Controlled Environment That Supports Both Infection Control And Staff Efficiency. The Hallway, With A Clear Width Of 2.44 Meters, Facilitates Smooth Movement While Maintaining Asepsis And A Comfortable Atmosphere For Patients And Medical Personnel. Closed-circuit Television Cctv Shall Be Installed At The Hallway Of This Floor And At Least Two Views Or Angles Of Cctv Or More As Required With Central Monitor At Nurse Station. - Lighting System: A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least Six (6) Units Smoke Detector. • Staff’s Lounge - This Room/space Is Designed To Include A Comfort Room, A Counter With A Sink, Space For Dining Tables, And Resting Facilities. It Offers A Relaxing And Functional Space For Staff To Unwind, Eat, And Refresh During Their Shifts. - Planning Relationships: A. Next To Staff’s Main Entrance B. Adjacent To Staff’s Lockers. - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Ventilation System: F. Provide At Least One (1) Unit Orbit Fan. • Janitor’s Closet - This Room/space Is Designed To Keep Cleaning Materials With Mop Sink And As Storage For Janitor’s Cleaning Tools. - Planning Relationships: A. One Janitor’s Closet Located Close To Delivery/operating Room B. One Janitor’s Closet Located To Staff’s Lockers And Lounge. - Lighting System: C. For General Illumination, Provide At Least 250 Lux. - Power System: D. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. • Wheeled Stretcher’s Area - This Room/space Is Located Near The Main Entrance, This Area Is Designed To Accommodate At Least Two (2) Bed Stretchers, Ensuring Easy Access And Quick Deployment For Patients Arriving Via Stretcher. It Is Strategically Placed For Efficient Patient Handling And Smooth Transitions To Other Areas Of The Facility. - Planning Relationships: A. Located At The Entrance Of Delivery & Nicu Suite/complex - Lighting System: B. For General Illumination, Provide At Least 250 Lux. - Power System: C. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. • All Gender / Pwd Toilet - This Restroom Is Designed To Be Inclusive, Complying With The Updates To The Amended Irr Of Bp 344. It Ensures Accessibility For All Genders And Persons With Disabilities (pwd), Featuring Wide Doors, Support Bars, Urinal And Spacious Layout To Meet The Latest Standards For Accessibility And Comfort. - Planning Relationships: A. Accessible To All Patients, Relatives And Visitors. B. Minimum Of One (1) Toilet On Each Floor Accessible To Disabled. - Lighting System: C. For General Illumination, Provide At Least 250 Lux. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. • Toilets/comfort Rooms - One Comfort Room For Both Male And Female Adult Ward While Separate Comfort Rooms For Stations, Offices And Service Rooms. - Planning Relationships: A. Equipped With Wall Mounted Intravenous (iv) Fluid Hook For Patient Rooms And Emergency Pull Chord With Corridor Lights Installed Above The Door. - Lighting System: B. For General Illumination, Provide At Least 250 Lux. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. • Access/exit Stairs - Stairs That Provide Essential Vertical Circulation For Movement Between Different Levels Of A Building, Typically Serving As Both An Access Point For Entry And An Exit For Egress. These Stairs Must Meet Safety Regulations, Including Proper Width, Handrails, Non-slip Treads, And Clear Signage For Easy Navigation. They Should Also Be Designed To Accommodate Emergency Evacuations And Ensure Accessibility Where Possible. - Planning Relationships: A. Exits Terminate Directly At An Open Space To The Outside Of The Building B. Minimum Of Two (2) Exits, Remote From Each Other, For Each Floor Of The Building - Lighting System: C. For General Illumination, Provide At Least 250 Lux. • Access Ramps - Ramps Designed To Provide A Smooth, Accessible Pathway For Individuals With Mobility Challenges, Such As Wheelchair Users, To Enter Or Exit A Building. These Ramps Should Meet Accessibility Standards, Including Proper Slope (usually 1:12), Non-slip Surfaces, Handrails On Both Sides, And Clear Signage. They Are Essential For Ensuring Equal Access To All Areas Of A Building, In Compliance With Accessibility Laws Like The Amended Irr Of Bp 344. - Planning Relationships: A. A Ramp Shall Have A Minimum Clear Width Of 1.22 Meters (or 4 Feet) In One Direction (or 2.44 Meters Or 8 Feet In Two Opposite Directions). B. The Slope Of The Ramp Shall Not Be Steeper Than 1:12 Meters. - Lighting System: C. For General Illumination, Provide At Least 250 Lux. • Electrical/auxiliary Room - Due To Limited Space, This Room Is Designed With A Bi-folding Door That Provides At Least 1.60 Meters Of Clear Opening Width. Located On The Ground Floor In The Staff Hallway, It Is Strategically Placed Away From Direct Patient Access To Maintain Separation And Safety While Ensuring Easy Access For Maintenance And Operation. - Lighting System: A. For General Illumination, Provide At Least 250 Lux. - Fire Alarm System: B. Provide At Least One (1) Unit Smoke Detector. Ground Floor – Delivery Complex • Nurse Station W/ Sink, Inc. Supply Room And T&b - This Area Is Dedicated For The Nurses And Other Medical Staff Assigned To This Floor. It Shall House The Patient’s Charts, Patient’s Medications With Proper Compartmentalization, Nurse Call System Central Station, One Dedicated Comfort Room, Supply/medication Room And Ample Area For Doctors To Do Charting And Nurses’ Personal Belongings. This Station Should Be Located To Permit Visual Observation Of Patient (specifically Areas Such As Labor Room And High-risk Pregnancy Unit Room) And Movement Into The Suite. This Is Also Located Within The Sterile Area Of The Ob-gyne Complex, Is An Open Station, And Has Direct Access To The Hallways Common/centralized Air Conditioning. - Planning Relationships: A. Adjacent To Breastfeeding Room B. Close To Nicu, Ob-gyne Emergency Department - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. For General Illumination, Provide At Least 500 Lux. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: E. For General Illumination, Provide At Least 500 Lux. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: F. Provide And Install The Following Auxiliary System: • Communication System  Telephone System – Provide At Least One (1) Unit Telephone Outlet.  Local Area Network System – Provide At Least One (1) Unit Data Outlet.  Public Address Paging System – Provide At Least One (1) Unit Paging System  Nurse Call System - Provide At Least One (1) Unit Nurse Call System - Fire Alarm System: G. Provide At Least Two (2) Units Smoke Detector. - Security System: H. Provide At Least Two (2) Units Smoke Detector. Provide Closed – Circuit Television Cctv Shall Be Installed At The Lobby And Corridor Or Hallway Of This Floor With Central Monitor Located At The Reception Area And At Least Two Views Or Angles Of Cctv Shall Be Installed At The Wards With Central Monitor At Nurse Station. • Labor Room - This Area Is Dedicated For Maternity Patients To Be Monitored And Supervised During Labor And Delivery. Before Being Transferred To The Delivery Room, Patients Stay In The Labor Room For Assessment And Monitoring. Labor Rooms Should Have Adequate Lighting, Including Ambient Light And Focus Lights For Labor And Examination Tables. Labor Rooms Should Have A Viewing Window That Is Directly Visible From The Nurse's Station To Facilitate Easy Monitoring. It Shall Also House One Dedicated Comfort Room And A Common Counter With Sink. - Planning Relationships: A. Adjacent To Delivery Room B. Close To Caesarian Delivery Room C. Close To Scrub-up And Sub-sterilizing Room - Lighting System D. For General Illumination, Provide At Least 500 Lux. - Power System: E. Provide At Least Nine (9) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: F. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: G. Provide And Install The Following Auxiliary System: • Communication System  Telephone System – Provide At Least One (1) Unit Telephone Outlet.  Local Area Network System – Provide At Least One (1) Unit Data Outlet.  Nurse Call System - Provide At Least One (1) Unit Nurse Call System - Fire Alarm System: H. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: I. Provide Air Conditioning Unit System • Delivery Room - This Area Is Dedicated For Normal Spontaneous Delivery Services. It Shall Also House At Least Four (4) Delivery Beds And A Dedicated Newborn Resuscitation Area, A Place With A Flat Firm Surface And Heat Source, For Immediate Resuscitation And Stabilization Of Newborns Who Require Assistance At Birth. This Area Is Typically Equipped With Necessary Medical Equipment, Such As Oxygen, Suction Devices, And Other Resuscitation Tools, And Is Staffed By Trained Healthcare Professionals To Provide Emergency Care To Newborns In Critical Condition. The Delivery Room Shall Be Remote As Practicable From The Entrance To Provide Asepsis. To Observe Asepsis And Prevent Non-related Traffic In The Facility, The Delivery Room, Scrub-up Area, And The Sub-sterilization Room (considered As Clean/sterile Areas) Must Be Grouped Together Away From The General Administrative Service Which Are Considered As Common Areas. - Planning Relationships: A. Adjacent To Sub-sterilizing Room B. Adjacent To Scrub-up - Lighting System C. For General Illumination, Provide At Least 750 Lux. - Power System: D. Provide At Least Five (5) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Outlet 15a, 2p, 240v, Single, Grounding Type, Tandem. Two (2) Units Ground Terminal, Duplex. Also, Allocate Two (2) Units Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: E. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: F. Provide And Install The Following Auxiliary System: • Communication System  Telephone System – Provide At Least One (1) Unit Telephone Outlet.  Local Area Network System – Provide At Least One (1) Unit Data Outlet.  Nurse Call System - Provide At Least One (1) Unit Nurse Call System - Fire Alarm System: G. Provide At Least One (1) Unit Heat Detector. - Air Conditioning And Refrigeration System: H. Provide Air Conditioning System • Cesarian Delivery Room - This Area Is Specialized Operating Room Equipped For Performing Cesarean Sections, A Surgical Procedure Used To Deliver A Baby Through An Incision In The Mother's Abdomen And Uterus. This Room Is Designed To Accommodate The Surgical Team And Necessary Medical Equipment, Ensuring A Sterile Environment And Readiness For Any Complications That May Arise During The Delivery. It Is Typically Equipped With Operating Tables, Surgical Instruments, Anesthesia Equipment, And Monitoring Devices For Both The Mother And Baby. This Operating Room Shall Be Remote As Practicable From The Entrance To Provide Asepsis. To Observe Asepsis And Prevent Non-related Traffic In The Facility, The Delivery Room, Operating Room (c-section), Scrub-up Area, And The Sub-sterilization Room (considered As Clean/sterile Areas) Must Be Grouped Together Away From The General Administrative Service Which Are Considered As Common Areas. - Planning Relationships: A. Adjacent To Sub-sterilizing Room B. Adjacent To Scrub-up - Lighting System C. For General Illumination, Provide At Least 1000 Lux. - Power System: D. Provide At Least Nine (9) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: E. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: F. Provide And Install The Following Auxiliary System: • Communication System  Telephone System – Provide At Least One (1) Unit Telephone Outlet.  Local Area Network System – Provide At Least One (1) Unit Data Outlet.  Nurse Call System - Provide At Least One (1) Unit Nurse Call System - Fire Alarm System: G. Provide At Least One (1) Unit Heat Detector. - Air Conditioning And Refrigeration System: H. Provide Air Conditioning System • High-risk Pregnancy Unit - This Area Is Dedicated To The Care And Management Of Pregnant Women Who Have Been Identified As Having A Higher Risk For Complications During Pregnancy, Labor, Or Delivery. The Unit Provides Close Observation And Interventions To Ensure The Health And Safety Of Both The Mother And The Baby, Offering Specialized Care For Conditions Such As Gestational Diabetes, Hypertension, Multiple Pregnancies, Or Other Medical Concerns. It Shall Also House One Dedicated Comfort Room Should Have A Viewing Window That Is Directly Visible From The Nurse's Station To Facilitate Easy Monitoring. This Room Should Be Located In Close Proximity To The Doctor's Quarters Or On-call Room To Facilitate Immediate Intervention In Case Of Emergencies. - Planning Relationships: A. Close To Delivery Room B. Adjacent To Sub-sterilizing Room C. Close To Cesarian Delivery Room - Lighting System D. For General Illumination, Provide At Least 1000 Lux. - Power System: E. Provide At Least Fourteen (14) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: F. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: G. Provide And Install The Following Auxiliary System: • Communication System  Telephone System – Provide At Least One (1) Unit Telephone Outlet.  Local Area Network System – Provide At Least One (1) Unit Data Outlet.  Nurse Call System - Provide At Least One (1) Unit Nurse Call System  Master Or Cable Antenna Television - Fire Alarm System: H. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: I. Provide Air Conditioning System • Septic Lr/dr (labor Room/delivery Room) - This Room/space With Septic Cases Physically Separated From Regular Cases To Avoid Infection. This Room Is Equipped To Handle Sterile Procedures While Minimizing The Risk Of Cross-contamination, With Enhanced Infection Control Measures In Place. It Is Typically Isolated To Prevent The Spread Of Infections And May Include Specialized Equipment For Both Maternal And Neonatal Care To Address Potential Complications Arising From The Infection. This Room Should Be Located In Close Proximity To The Doctor's Quarters Or On-call Room To Facilitate Immediate Intervention In Case Of Emergencies. - Planning Relationships: A. Close To Delivery Room B. Adjacent To Sub-sterilizing Room C. Close To Cesarian Delivery Room - Lighting System D. For General Illumination, Provide At Least 1000 Lux. - Power System: E. Provide At Least Nine (9) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: F. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: G. Provide And Install The Following Auxiliary System: • Communication System  Telephone System – Provide At Least One (1) Unit Telephone Outlet.  Local Area Network System – Provide At Least One (1) Unit Data Outlet.  Nurse Call System - Provide At Least One (1) Unit Nurse Call System - Fire Alarm System: H. Provide At Least One (1) Unit Heat Detector. - Air Conditioning And Refrigeration System: I. Provide Air Conditioning System • Scrub-up Area - This Room/space Where Preoperative Hand Washing Is Performed Located Outside Of The Delivery/operating Room Installed Either In A Recessed Wall Or Other Open Space But Shall Be Kept Away From Main Traffic Flow. This Shall Be Located Within The Sterile Zone Of The Delivery Complex, And Shall House 3-station Scrub Sink, With Gooseneck Spout & Foot Control, Sensor Type, And Provision For Hand-dryer. - Planning Relationships: A. Close To Delivery Room B. Adjacent To Cesarian Delivery Room - Lighting System C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light And Hand Dyer. - Auxiliary System: E. Provide And Install The Following Auxiliary System: • Communication System  Public Address Paging System – Provide At Least One (1) Unit Telephone Outlet. - Fire Alarm System: F. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: G. Provide Air Conditioning System • Sub-sterilizing Room - This Room/space Where Medical Instruments And Equipment Are Cleaned And Partially Sterilized Before Being Sent To A Main Sterilization Area For Final Sterilization. This Room Typically Serves As An Intermediate Step In The Sterilization Process, Focusing On Decontaminating Items, Such As Surgical Instruments, To Reduce The Risk Of Infection. This Room Is Equipped With Sinks, Disinfectants, Ultrasonic Cleaners, And Possibly Other Equipment To Assist In The Preparation Of Items For Full Sterilization. It Should Be Accessible From The Delivery Room And Operating Room. Should Have A Utility Door That Provides Access Out From The Sterile Route, Ensuring A Controlled Flow Of Items Without Compromising The Sterile Environment. This Utility Door Should Lead To A Non-sterile Area, Allowing For The Safe And Efficient Movement Of Equipment And Materials, While Preventing Contamination From Entering The Sterile Zones. - Planning Relationships: A. Adjacent To Operating Room B. Adjacent To Scrub-up Area - Lighting System C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least Three (3) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: E. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: F. Provide And Install The Following Auxiliary System: • Communication System  Public Address Paging System – Provide At Least One (1) Unit Telephone Outlet. - Fire Alarm System: G. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: H. Provide Air Conditioning System • Sterile Instrument And Supply Storage - This Room/space Is Where Medical Supplies And Sterile Instruments Needed For Normal Spontaneous Delivery Are Kept. This Shall House A Counter With Sink And Drainboard, And Door With Vision Panel. - Planning Relationships: A. Located At Delivery Area/complex B. Adjacent To Nurse Supervisor’s Area/station - Lighting System C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least Four (4) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: F. Provide Air Conditioning System • Clean-up Room - This Room/space Is Intended For The Sterilization Of Instruments In Accordance With Doh Guidelines On Cleaning, Disinfection, And Sterilization Of Reusable Medical Devices In Hospital Facilities In The Philippines (annex B Of Administrative Order No. 2012-0012). This Shall House Counter For Work, Sink With Double Compartment; Laundry; 350-400 Mm Deep. - Planning Relationships: A. Located At Delivery Area/complex B. Adjacent To Nurse Supervisor’s Area/station - Lighting System C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Ventilation System: F. Provide Least One (1) Orbit Fan. • Doctor’s On-call Room - This Room/space Is Where Doctors Can Rest And Recuperate While Being Available For Urgent Patient Needs Or Emergencies. It Shall 0house One Dedicated Toilet And Bath, Resting Facilities, And With Essential Features Such As Sound-proofing And Alert System That Notifies The Doctors Of Emergencies Or When They Are Needed Urgently. It Should Be Located In Close Proximity And Have Direct Access To The High-risk Pregnancy Unit, Septic Labor/delivery Room, Labor Room, And Nurse Station. - Planning Relationships: A. Located At Delivery Area/complex B. Adjacent To Nurse Supervisor’s Area/station C. Close To High-risk Pregnancy Unit, Septic Labor/delivery Room, And Labor Room - Lighting System D. For General Illumination, Provide At Least 500 Lux. - Power System: E. Provide At Least Eight (8) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light - Fire Alarm System: F. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: G. Provide Air Conditioning System Ground Floor – Ob-gyne Emergency Department • General Requirements - This Area Should Be Located In Ground Floor To Ensure Easy Access For Patients. It Shall Also Have Separate Entrance To The Emergency, And Corridors For Access By Patient Using Bed Or Stretcher And Equipment (2.44 Meters Or 8.00 Ft. Clear Width) And A Ramp For Wheelchair Access (with A Clear Width Of At Least 1.22 M. Of 4.00 Ft.). Due To Limited Space Available, This Whole Area Only House Small Independent Nurse Station With Counter And Sink, Observation Bay And Treatment Area With Sink Or Wall-hung Lavatory, Divided By Privacy Curtains/dividers, Equipment/supply Storage For Direct Access To Resuscitation Equipment, One Dedicated Comfort Rooms, And A Patient Dressing/changing Room With Separate Entrances To The Emergency Department And Onto Delivery Complex Sterile Hallway To Provide Asepsis. • Waiting Area - This Room/space Is Where Patients, Companions, And Visitors Can Wait Comfortably. However, This May Be Located Outside Of The Birthing Clinic If There Is No Sufficient Space Provided That There Should Be An Overhead Cover. The Waiting Area Can Also Be Situated Along A Corridor Provided That The Width Of Such Corridor Shall Not Decrease Lower Than 1.83 M In Width. It Should Be Well-ventilated And Equipped With Ample Lighting To Ensure A Comfortable And Inviting Environment For Patients And Visitors. This Shall Be In Close Proximity To Other Provided Common Areas Such As Comfort Rooms And Common Counter With Sink For Hygienic Activities. - Lighting System A. For General Illumination, Provide At Least 250 Lux. - Power System: B. Provide At Least Ten (10) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. - Ventilation System: D. Provide Least Two (2) Units Orbit Fan • Nurse Station With Sink - This Area Is Located To Permit Observation Of Patient And Control Access To Entrance, Waiting Area, And Treatment Area. This Area Should Also House A Working Table And A Separate Counter With Sink. - Planning Relationships: A. Located At Ob-gyne Emergency Department B. Close To Emergency Entrance C. Adjacent To Observation Bay And Examination/treatment Room - Lighting System D. For General Illumination, Provide At Least 500 Lux. - Power System: E. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Ground Fault Circuit Interrupter (gfci) Outlet. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: F. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: G. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System - Provide One (1) Unit Paging System. - Nurse Call System – Provide One (1) Unit Nurse Call System. - Fire Alarm System: H. Provide At Least One (1) Unit Smoke Detector. - Security System: I. Provide Closed – Circuit Television Cctv With At Least Two Views Or Angles Of Cctv Shall Be Installed With Central Monitor At Nurse Station. - Air Conditioning And Refrigeration System: J. Provide Air Conditioning System • Observation Bay - This Room/space Is Designated Area Where Patients Can Be Closely Monitored After Initial Assessment. This Space Only Houses One (1) Observation Bed Or Recliner Due To Insufficient Space Available. It Is Adjacent To Examination/treatment Room And Should Be Divided By Privacy Curtains/dividers, And Should Be In Close Proximity To Comfort Room Available. - Lighting System A. For General Illumination, Provide At Least 750 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Allocate One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: E. Provide Air Conditioning System • Examination And Treatment Area - This Room/space Where Pre- And Post-natal Check-up Is Conducted, It Is Designated Area With Clear Visibility From The Nurse Station, Efficient Equipment Placement, And Dedicated Spaces For Examination And Treatment. It Is Adjacent To Observation Bay And Should Be Divided By Privacy Curtains/dividers. This Shall Have A Sink Or A Wall-hung Lavatory And Should Be In Close Proximity To Comfort Room Available. This Space Shall Also Accommodate One (1) Procedural Bed, Similar To The Examination Bed But With Extra Support For Patients Undergoing Treatments And Space For Equipment. The Bed Should Be Adaptable For Minor Procedures Like Suturing, Drainage, Or Stabilization For Transport. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Four (4) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System - Provide One (1) Unit Paging System. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: F. Provide Air Conditioning System • Equipment/supply Storage Room - This Room/space Is Essential For Maintaining Organized, Accessible, And Sterile Storage Of Medical Supplies, Instruments, And Other Necessary Materials. Due To Limited Space, Set-up Must Be Optimized To Ensure Essential Supplies Are Organized And Accessible. This Shall Also Be Temperature/humidity Controlled To Preserve The Quality Of Stored Sensitive Items. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. - Ventilation System: D. Provide At Least One (1) Unit Orbit Fan. Ground Floor – Neonatal Intensive Care Unit (nicu) • General Requirements - The Nicu, Located Adjacent To The Breastfeeding Room And On The Same Floor As The Delivery Complex, Should Be Designed To Maximize Limited Space. It Will Include An Independent Nurse Station With An Attached Comfort Room For Staff Convenience. The Layout Will Accommodate Supply Storage, With Vertical Solutions To Save Space, And Provide An Ample Area For Examination Table And Essential Equipment. Infection Control Measures Will Be In Place, Including Zoning For High-risk Cases, Handwashing Stations, And Access To Ppe. Nicu Shall Be Separate But Immediately Accessible From The Delivery Room/cesarian Operating Room. The Nicu Will Be Soundproofed To Minimize Noise And Create A Quiet, Conducive Environment For Neonates' Rest And Recovery. Due To Limited Space, The Nicu Will House Only Ten (10) Bassinets. The Design Will Focus On Maximizing Available Space While Ensuring Essential Equipment, Infection Control Measures, And Patient Comfort Are Maintained. This Shall Also Include A Viewing Glass Window For Family Members To Observe Their Newborns While Maintaining The Necessary Infection Control Protocols. This Window Will Be Strategically Positioned In A Way That Provides A Clear View Of The Ten (10) Bassinets And Ensures Privacy And Security. • Nurse Station W/ Sink, Including Supply Room And Toilet - The Nicu Design Will Include An Independent Nurse Station With A Sink For Hand Hygiene, Ensuring Staff Can Maintain Cleanliness And Efficiency While Monitoring Patients. It Will Also Feature A Separate Counter With A Sink And An Additional Counter Or Table For Work Tasks. Adjacent To The Nurse Station, A Comfort Room Will Provide Convenience For Staff During Long Shifts. The Layout Will Incorporate Supply Storage With Vertical Solutions To Optimize Space And Keep Essential Equipment Organized, Maximizing The Use Of Limited Space While Ensuring Facilities For Both Patient Care And Staff Comfort. - Planning Relationships: A. Adjacent To Breastfeeding Room - Lighting System B. For General Illumination, Provide At Least 500 Lux. - Power System: C. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter (gfci). Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: D. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: E. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System - Provide One (1) Unit Paging System. - Nurse Call System – Provide One (1) Unit Nurse Call System. - Fire Alarm System: F. Provide At Least Two (2) Units Smoke Detector. - Security System: G. Provide Closed – Circuit Television Cctv At Least Two Views Or Angles Of Cctv Shall Be Installed At The Wards With Central Monitor At Nurse Station - Air Conditioning And Refrigeration System: H. Provide Air Conditioning System • Breastfeeding Room Including Sink And Toilet - This Room, Located Adjacent To The Nicu, Will Be Designed With Its Own Counter And Sink For Hygiene And Convenience. It Will Include A Comfort Room For The Mother's Use And Ample Seating Space For Comfortable Breastfeeding. Additionally, The Room Will Feature A Foldable Diaper Changing Station, Maximizing Space While Providing Necessary Facilities. This Layout Ensures A Private And Functional Space For Mothers To Care For Their Newborns While Maintaining Proximity To The Nicu. - Planning Relationships: A. Adjacent To Nurse Station And Nicu - Lighting System B. For General Illumination, Provide At Least 500 Lux. - Power System: C. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter (gfci). Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: E. Provide Air Conditioning System Ground Floor – Cmps (chief Of Medical Professional Staff’s Office) • Chief Of Medical Professional Staff’s Office - The Chief Of Medical Professional Staff’s Office Will Be Strategically Located Close To The Delivery Complex And Will Be Soundproofed (such As High-density Acoustic Panels, Insulated Walls) To Ensure Privacy And A Quiet Environment. The Office Will Include A Toilet And Bath, Archive Area, With A Hidden Access Door Connecting To The Office For Discreet Access. It Will Also Feature A Secretary And Receiving Area, A Conference Room With An Attached Comfort Room, And A Pantry For Staff Convenience. The Archives Area Will Be Situated Nearby For Easy Access To Important Documents, Ensuring A Functional And Efficient Workspace While Maintaining Privacy And Comfort. The Chief Of Medical Professional Staff’s Office Will Include A Corner With A Full-length Window, Offering A Panoramic View Of The Hospital's Vicinity. This Design Feature Will Enhance Natural Light, Provide A Sense Of Openness, And Allow The Chief To Observe The Surrounding Area. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots For Cmps Office, Two (2) Units For Secretary’s Area, Two (2) Units For Receiving Area, Six (6) Units For Conference Room And Two (2) Units For Lounge/pantry. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light, For Cmps Office, Secretary’s And Receiving Area, And Conference Room. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide Three (3) Units Data Outlet. - Public Address Paging System - Provide One (1) Unit Paging System. - Fire Alarm System: E. Provide At Least Four (4) Units Smoke Detector. - Air Conditioning And Refrigeration System: F. Provide Air Conditioning System Second Floor – Ob-gyne Wards / Recovery Rooms • Nurse Station With Sink, Including Supply Room, Medication Room, And Toilet - This Enclosed Area, Located On The Second Floor Intended For Wards, Recovery Rooms, And Other Service Rooms, Is Dedicated To Nurses And Medical Staff Assigned To This Floor. It Houses Patient Charts, Medications With Proper Compartmentalization, A Nurse Call System Central Station, A Dedicated Comfort Room, A Supply/medication Room, And Ample Space For Doctors To Do Charting And Nurses' Personal Belongings. The Station Allows For Visual Observation Of Key Patient Areas And Movement Into The Suite. It Is Centrally Located With Direct Access To The Common Hallways. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter (gfci). Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System - Provide One (1) Unit Paging System. - Nurse Call System – Provide One (1) Unit Nurse Call System. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Security System: F. Provide Closed – Circuit Television Cctv With At Least Two Views Or Angles Of Cctv Shall Be Installed With Central Monitor At Nurse Station. - Air Conditioning And Refrigeration System: G. Provide Air Conditioning System • Two (2) Private Rooms (1-bed Capacity) With Toilet And Bath - These Rooms Are Designed To Provide A Private, Comfortable Space For Patients, Each With A Single Bed, And Include An Attached Toilet And Bath For Patient Convenience And Privacy. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Semi-private Rooms (3-bed Capacity) With Shared Sink, Toilet And Bath - This Room Is Designed To Accommodate Three Patients, Offering A Semi-private Setting With A Shared Space For Comfort And Care. This Room Includes A One (1) Shared Sink, And Toilet And Bath. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Infirmary Room (1-bed Capacity) With Toilet And Bath - This Room Is Designed To Accommodate The Hospital Staff’s And/or Their Immediate Family Members. It Provides A Private Space With A Bed, Toilet, And Bath, Offering Comfort And Privacy While Supporting Basic Medical Needs During Their Stay. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Isolation Room (1-bed Capacity) With Sink, Ante Room, Toilet And Bath - This Room Is Designed To Accommodate A Single Patient In Isolation, Providing A Controlled Environment For Infectious Or High-risk Patients. It Includes A Bed, Ante Room With Sink Or Wall-hung Lavatory For Staff To Change And Prepare Before Entering, And An Attached Toilet And Bath For Patient Comfort And Hygiene. The Room Is Equipped To Prevent The Spread Of Infection, With Strict Access Control And Infection Control Measures In Place. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Teen Adolescent (6-bed Capacity) With Shared Sink, Shower And Toilet - This Room Is Designed To Accommodate Up To Six Adolescent Patients, Featuring A Shared Sink, With Separate Shower And Toilet Facilities To Ensure Privacy And Hygiene. The Shared Sink Area Allows For Efficient Use Of Space While Maintaining Cleanliness, While The Separate Shower And Toilet Provide The Necessary Amenities For Patient Comfort And Convenience. The Design Creates A Supportive And Functional Environment For Young Patients, Offering Ease Of Access To Medical Care. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Gyne Ward (7-bed Capacity) With Shared Sink, Shower And Toilet - This Room Is Designed To Accommodate Up To Seven (7) Gynecological Patients. It Includes Shared Facilities Such As A Sink, Shower, And Toilet To Efficiently Serve The Needs Of Multiple Patients While Ensuring Hygiene And Convenience. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Ob Ward (6-bed Capacity) With Shared Sink, Shower And Toilet - This Room Is Designed To Accommodate Up To Six (6) Obstetrics Patients, Featuring Shared Sink, Shower, And Toilet Facilities. The Shared Amenities Help Optimize Space While Ensuring Patients Have Access To Essential Hygiene Facilities. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • Ob Ward Extension (18-bed Capacity) With Shared Sink, Shower And Toilet - This Extension Is Designed To Accommodate Up To Eighteen (18) Obstetrics Patients, With Shared Sink, Shower, And Toilet Facilities. The Shared Amenities Ensure Efficient Use Of Space While Providing Essential Hygiene Facilities For All Patients. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Eighteen (18) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least Six (6) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • Csb Care For Small Baby Room With Toilet - This Room Is Designed For Small Or Premature Babies, With Space For Four Beds, An Attached Toilet, Foldable Diaper Changing Station, And Resting Facilities For Caregivers. It Provides A Functional And Comfortable Environment For Both Babies And Families. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • Hearing Screening Room - A Dedicated Space For Conducting Hearing Tests And Screenings, Typically For Newborns Or Young Children. The Room Is Equipped With Specialized Auditory Equipment And Soundproofing To Ensure Accurate Results. It Is Designed To Provide A Quiet, Controlled Environment For Hearing Assessments, With Comfortable Seating For Patients And Their Guardians. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: E. Provide Air Conditioning System • Newborn Screening Room - The Room Is Equipped With The Necessary Medical Equipment For Blood Sampling, Physical Exams, And Diagnostic Tests. It Is Designed To Provide A Safe, Comfortable Environment For Newborns And Their Parents While Ensuring The Efficient And Accurate Collection Of Screening Samples. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: E. Provide Air Conditioning System • Stock Room - A Storage Area For Medical Supplies And Equipment, Organized With Proper Shelving And Labeling For Easy Access And Inventory Control. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. • Department Chair’s Office Including Secretary And Receiving Area And Toilet - Located Adjacent To The Conference Room, This Office Includes A Work Room For The Chair, A Secretary And Receiving Area, And An Attached Toilet For Convenience. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System – Provide One (1) Unit Paging System. - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • Conference Room - Located Adjacent To The Department Chair's Office, This Room Is Designed For Meetings And Presentations, Equipped With A Large Table, Seating, And Audiovisual Equipment For Effective Communication. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least Two (2) Units Floor Mounted Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type, Universal Slot. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: E. Provide Air Conditioning System • Doctor’s Quarters With Shared Shower And Toilet - Due To Limited Space, This Room Accommodates Two Beds, With Shared Shower And Toilet Facilities, Providing Comfort And Privacy For Doctors During Their Shifts Or On-call Duties. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • Affiliates Lounge With Toilet And Bath - A Designated Space For Hospital Affiliates To Relax, Equipped With Comfortable Seating And An Attached Toilet And Bath For Convenience. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least Two (2) Units Floor Mounted Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type, Universal Slot. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System Third Floor – Conference / Training Room, Office Rooms • Conference/training Room With Male And Female Toilets - A Room For Meetings Or Training, Featuring Separate Male And Female Toilets For Convenience. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least Two (2) Units Floor Mounted Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type, Universal Slot. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least Three (3) Units Smoke Detector. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System – Provide One (1) Unit Paging System. - Air Conditioning System: E. Provide Air Conditioning System • Office Room 1 (research And Petru) With Sink And Toilet - A Designated Office Space For Research And Petru Activities, Equipped With A Sink And An Attached Toilet For Convenience And Hygiene, And Access To A Shared Balcony For Relaxation And View Of The Hospital Grounds. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System – Provide One (1) Unit Paging System. - Air Conditioning System: G. Provide Air Conditioning System • Office Room 2 (qi/ps, Quality Improvement Patient Survey) With Sink And Toilet - A Dedicated Office For Quality Improvement And Patient Survey Activities, Featuring A Sink And An Attached Toilet For Convenience And Hygiene, And Access To A Shared Balcony For Relaxation And View Of The Hospital Grounds. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System – Provide One (1) Unit Paging System. - Air Conditioning System: F. Provide Air Conditioning System • Office Room 3 (osm, Office Of The Strategic Management) With Sink And Toilet - A Designated Office Space For The Office Of Strategic Management, Equipped With A Sink And An Attached Toilet For Convenience And Hygiene, And Access To A Shared Balcony For Relaxation And View Of The Hospital Grounds. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System – Provide One (1) Unit Paging System. - Air Conditioning System: E. Provide Air Conditioning System Roof Deck – Open Area • Open Areas For Mechanical Outdoor Units And Equipment - Designated Roof Deck Spaces For Housing Mechanical Units And Equipment, Ensuring Proper Ventilation And Easy Access For Maintenance. - Lighting System A. For General Illumination, Provide At Least 250 Lux. - Power System: B. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Xii. Geotechnical Investigation Specifications And Parameters A. Location Before The Conduct Of Sub-surface Soil Exploration Works, The Consultant/contractor Shall Coordinate With The Procuring Entity Technical Representative For Proper Coordination On The Location Of The Project. B. Scope Of Work The Consultant/contractor Shall Provide All The Labor, Instrument/equipment Materials And Supplies, Vehicles, Bunkhouses, Etc., Necessary To Perform Satisfactorily The Sub-surface Exploration Herein Required, Viz: 1. Field Works 2. Laboratory Testing 3. Soil Investigation And Preparation Of Report 4. Geotechnical Evaluation Report The Consultant/contractor Shall Be Held Solely Responsible For The Result Of This Boring/drilling Exploration And Other Activities Under This Terms Of Reference C. Detailed Exploration Requirements/specifications A. Field Works 1. Location And Number Three (3) Boreholes, At Different Location Shown On The Plan. 2. Depth Of Borings Twenty (20) Meters Depth Below Natural Ground Or Five (5) Meters In Bedrock/hard Strata. 3. Procedure In Sand, Clay And Silt Materials, The Boreholes Shall Be Advanced By The Wash Boring Method In Between Sampling Sections Using Side Discharged Chopping Bits. Whenever Necessary, N-size Casings Shall Be Utilized. The Washed Section Shall Be Cleaned Thoroughly Before Each Sampling Run Ensuring, However, That The Underlying Soil Is Not Disturbed. Sampling Shall Be Done At One Meter Interval From The River Bed To Hard Strata Using 5.0 Cm. Split Spoon Sampler. In A Soft Cohesive Layer, Undisturbed Samples Using Thin-walled Tube Samplers Shall Be Obtained Hydraulically. Core Drilling Shall Be Carried Out By A Diamond Rotary Drill Method In Gravelly Or Rock Formation. Core Samples Shall Be Undertaken Whenever Solid Formation Is Encountered. Cores Shall Be Placed In Core Boxes Arranged And Labeled In Accordance To Depth As Soon As These Are Extracted From The Boreholes. Drilling And Sampling Procedures Shall Comply In Accordance With Astm Standards. 4. Equipment A. Drilling Machine The Contractor Shall Utilize At Least Two (2) Drilling Machines And Set Them Up At The Project Site. The Drilling Machine Shall Be In Good Working Condition And Shall Be Of Such Capacity As To Maintain Satisfactory Progress Of Work. B. Bits The Contractor Shall Have An Ample Supply Of Different Types Of Bits To Adopt To Varying Conditions. Bottom Discharge And Stepped Bits Shall Also Be Available. C. Core Barrels Double Tube Swivel Type Core Barrels In Good Condition And Capable Of Obtaining Maximum Core Recovery Shall Be Used. D. Casing The Contractor Shall, At His Own Expense And Responsibility, Provide Casings As Required To Ensure The Stability Of The Borehole Walls. The Casing Shall Be At Least Of N-size And Shall Be In Good Condition. After A Hole Has Been Finished The Casings Shall Be Retrieved. 5. Handling And Core Of Samples The Contractor Shall Provide All The Materials, Equipment And Labor Necessary For Preserving Samples. B. Laboratory Testing The Preparation Of Samples For Testing Shall Be Made In Accordance With Aashto. The Following Tests Shall Be Made On Samples Obtained From Boring, Drilling. Standard Penetration Test The Test Shall Be Carried Out Through Ordinary Soil Encountered To The Depths Specified Above. Standard Penetration Test Shall Be Performed Using 5.0 Cm. (2.0 In.) Outside Diameter Split Spoon Sampler, Driven By A 63.6 Kg (140 Lbs.) Hammer Falling 76.0 Cm. (30 In.) At 1.50-meter Interval Or Closer If Necessary. Moisture-density Rotation This Test Method Determines The Relationship Between The Moisture Content And The Density Of Soils Compacted In A Mold. The Contractor Shall Conduct This Procedure According To Nd T 99 Or Nd T 180. Bearing Capacity Test The Test Method Covers Estimation Of The Bearing Capacity Of Soil In Place By Means Of Field Loading Tests. This Test Method Can Be Used As Part Of A Procedure For Soil Investigation For Foundation Design. It Gives Information On The Soil Only To A Depth Equal To About Two Diameters Of The Bearing Plate, And Takes Into Account Only Part Of The Effect Of Time. Sieve Analysis The Contractor Shall Conduct This Test In Accordance With Aashto T 27 And Materials Finer Than No. 200 (75 Μm) In Accordance With Aashto T 11. The Procedure Combines The Two Test Methods. Sieve Analyses Determine The Gradation Or Distribution Of Aggregate Particles Within A Given Sample In Order To Determine Compliance With Design And Production Standards. Accurate Determination Of Material Smaller Than No. 200 (75 Μm) Cannot Be Made With Aashto T 27 Alone. If Quantifying This Material Is Required, It Is Recommended That Aashto T 27 Be Used In Conjunction With Aashto T 11. Following Aashto T 11, The Sample Is Washed Through A No. 200 (75 Μm) Sieve. The Amount Of Material Passing This Sieve Is Determined By Comparing Dry Sample Masses Before And After The Washing Process. This Procedure Covers Sieve Analysis In Accordance With Aashto T 27 And Materials Finer Than No. 200 (75 Μm) In Accordance With Aashto T 11. The Procedure Includes Two Method Choices, A And B. Liquid Limit Liquid Limit Test Shall Be Performed On Material Passing The 0.425mm (#40) Sieve. Aashto T 89 & T 90 27. There Are Two Methods Approved By Aashto, Any Of The Two Methods Can Be Used By The Contractor. Blow Count Must Be Within 22-28 Blows. Liquid Limit Is A Calculation Based On Moisture Content And Number Of Blows To Closure. Soil Classification This Standard Classifies Soils From Any Geographic Location Into Categories Representing The Results Of Prescribed Laboratory Tests To Determine The Particle-size Characteristics, The Liquid Limit, And The Plasticity Index. There Should Be Assigned Group Name And Symbol(s) Along With The Descriptive Information. Practice D2488 Can Be Used To Describe A Soil To Aid In The Evaluation Of Its Significant Properties For Engineering Use. Engineering Behavior Of The Soils Must Be Seen. C. Soil Investigation And Preparation Of Report The Soil Investigation Report Must Be Done By An Accredited Geotechnical Engineer. D. Geotechnical And Evaluation Report The Contractor Shall Prepare The Geotechnical Report & Analysis In Three (3) Bound Copies In A Form And Substance To Be Submitted To Doh – Ro7, Osmeña Boulevard, Cebu City Within Fifteen (15) Calendar Days Upon Receipt Of The Notice To Proceed. The Final Report Shall Not Be Limited To The Following: A) Field Investigation And Methodology B) Borehole Drilling And Sampling C) Laboratory Testing D) Final Boring Logs (bl) E) Final Laboratory Tests Results (fltr) F) Borehole Location Plan G) Soil Profile Along Structures Showing Boring/drilling Logs H) Soil Liquefaction Investigation Report I) Soil Bearing Capacity J) Recommendation If Called For Such As Type Of Measure/structure Of Work E. Other Data To Be Submitted A. Boring Logs 1. Job, Boring, Hole Number, Date, Time, Boring/drilling, Foreman, Supervisor 2. Weather Condition 3. Depth Of Boring At Start Of Day 4. Water Level In Casing At Start Of Day 5. Method Of Penetration And Flushing System 6. Description Of Soil Strata Encountered 7. Depth Of Soil Boundaries 8. Size, Type And Depth Of Samples And Sample Number 9. Type And Depth Of In-situ Tests 10. Standard Penetration Tests Resistance, “n” Value 11. Recovery Ratios Of Samples 12. Detailed Notes On Boring/drilling Procedure, Casing Sizes And Resistance To Driving, Description Of Wash Water Or Spoil From Boring/drilling Tools 13. Depth Of Boring At End Of Day 14. Other Relevant Information Such Rqd, Percent Core Recovery, Angle Of Friction Etc. B. Photographs Photographs Showing The Borehole Drilling And Sampling At Each Proposed Sites Shall Be Taken By The Contractor And Incorporated In The Report. Photographs Shall Be Taken At Each Borehole Location Depicting The Following: 1. Equipment Used 2. Core Drilling Operation 3. Water Level Measurements 4. Performance Of Spt And Shelby Tube Sampling 5. All Cores In The Core Boxes, Spt And Shelby Tube Samples 6. Date Photographs Was Taken -end Of Geotechnical Investigation- Xiii. Structural Design And Analysis Specifications And Parameters A. Codes And Standards The Civil/structural Design Shall Be In Accordance With The Following Codes And Standards  Codes 1. National Structural Code Of The Philippines (nscp) 2010 2. National Building Code Of The Philippines And Its Revised Irr 3. Accessibility Law 4. Local Codes And Ordinances  Standards 1. Bureau Of Product Standards (bps) 2. Philippine National Standards (pns) 3. Dpwh Blue Book 4. American Concrete Institute (aci) 5. American Society For Testing Materials (astm) 6. American Welding Society (aws) B. Design Criteria Shall Be Submitted First To The Procuring Entity For Concurrence Of The Following Minimum Design Requirements: 1. Design Loads (dead Load, Live Load, Wind Load, Seismic Load And Analysis Procedure, Load Combinations) 2. Materials (concrete, Reinforcing Steel Bars, Structural Steels) 3. Foundation (allowable Foundation Pressure) 4. Design References C. Minimum Design Input File In Structural Software And Required Reports 1. Job Information 2. Joint Coordinates 3. Material Definition/specification 4. Member Property 5. Support Definition 6. Load Definition (seismic/dead/live/wind/load Combinations) 7. Analysis Procedure 8. Analysis Result 9. Load List 10. Support Reaction List 11. Design Results (footing/ Column/ Beam) 12. Load Diagrams 13. Structural Plans -end Of Structural Design And Analysis- Xiv. Design Parameters (architectural) A. Codes And Standards The Architectural Works Shall Be In Accordance With The Following Laws, Codes And Standards.  Laws And Codes: 1. National Building Code Of The Philippines And Its Latest And Amended Irr 2. Ra 9266 Or Architecture Law And Its Latest And Amended Irr 3. Ra 4226 Or Hospital Licensing Act And Its Latest And Amended Irr 4. Bp 344 Or Accessibility Law And Its Latest And Amended Irr 5. Ao 35, S. 1994 Or Ao Pertaining To The Control Of Radiation Hazards 6. Ra 9514 Fire Code Of The Philippines 7. Existing Local Codes And Ordinances. 8. And Other Laws That Applies To The Projects  Standards: 1. Bureau Of Product Standards (bps) 2 Underwriters Laboratory (ul) 2. Doh Technical Guidelines For Hospital & Health Facilities Planning And Design – Level 3 B. General Drawing Guidelines 1. General  All Drawings Shall Be Computer-drafted. Drawings Shall Be Submitted Both In Printed And Electronic Copies.  Keep The Same Orientation For All Plans. The North Orientation Shall Be Indicated In All Architectural Floor Plans. The Orientation Of The Architectural Plans Shall Be Consistent With All The Engineering Plans.  Existing Buildings And New Works Shall Be Clearly Indicated And Labeled In The Site Plans.  Detailed Plans Shall Have A Scale Not Smaller Than 1:50 Meters.  Spot Detailed Plans, Elevations, And Sections Shall Have A Scale Not Smaller Than 1:10 Meters.  Avoid Notes Such As ‘see Architectural Detail’ Or ‘see Structural’. Always Refer With A Callout To The Specific Detail Drawing And Sheet Number. 2. Site Plans  The Site Plans Shall Have A Scale Not Smaller Than 1:500 Meters. 3. Floor Plans  All Plans Shall Be 1:100 Meters. The Same Scale Shall Be Used For The Rest Of The Architectural, Structural, Sanitary, Plumbing, Electrical And Mechanical Plans, Except For Each Trade’s Site Plan, Detailed Plans And Spot Details.  Elevation Callouts Shall Be Indicated On The Floor Plans And Shall Be Consistent With The Elevation Drawing.  Section Line Callouts On The Floor Plans Shall Be Consistent With The Section Drawing.  Floor Plans Shall Be Indicated With Boxed Room Callout Numbers, Including The Callout For Floor Finishes And Wall Finishes.  Floor Elevations Shall Be Indicated In The Floor Plans. This Shall Be In Reference To The Natural Grade Line Or The Established Finished Floor Lines Of The Adjoining Existing Buildings.  The Location Of Mechanical Equipment, E.g. Air Conditioning Shall Be Indicated In The Floor Plans. This Shall Be Consistent With The Mechanical And Electrical Plans.  Door Callouts Shall Be Circles With The Proper Numbering, E.g. D-01.  Window Callouts Shall Be Hexagons With The Proper Numbering, E.g. W-01. 4. Elevations And Sections  Finish Floor Lines And Top Of Truss Lines Shall Be Consistent In All The Elevations, Sections And Structural Plans And Details. 5. Reflected Ceiling Plans  Reflected Ceiling Plans Shall Be Indicated With Boxed Room Callout Numbers, Including The Callout For Ceiling Finishes And Lighting Fixtures.  Ceiling Height Relative And In Reference To The Finish Floor Line Shall Be Indicated In The Reflected Ceiling Plans In Each Room With Boxed Dimensions. This Is To Ensure That The Ceiling Heights Of All Rooms Are Established Whether Or Not Reflected In The Sections.  The Description And Location Of The Fixtures, E.g. Lighting, Smoke Detectors, Air Condition Vents, Exhaust Fans, In The Reflected Ceiling Plans Shall Be Consistent With The Electrical And Mechanical Plans. 6. Roof Plans  Location Of All Downspouts Shall Be Indicated In The Roof Plans. 7. Doors And Windows  Door And Window Schedules Shall Indicate The Type Of Door Or Window, The Number Of Sets, The Location/s Of The Door Or Window, The Materials And Accessories Included And Other Special Specifications, E.g. Color Or Finish. All Windows Above Ground Floor Should Be Of Awning With An 45 Deg. Opening Angle. 8. Details  Provide A Minimum Of One (1) Bay Section Of A Scale Not Smaller Than 1:50 Meters For Each Major Building Preferably Cut Along The Area With Special Construction Design.  Provide Spot Detail Plans, Elevations And Sections Of A Scale Not Smaller Than 1:10 Meters For Special Designs With Aesthetic Treatment And Ornamentation.  Provide Detailed Plans Of A Scale Not Smaller Than 1:50 For All Areas Needing Tile Pattern, E.g. Lobby, Corridor, Entrance Walk, Showing The Position And Pattern Of Tiles.  Centerline Location Of Plumbing Fixtures Shall Be Indicated In Detailed Plans With Lines Of Reference And Its Corresponding Dimensions. This Is To Indicate The Exact Locations Of The Plumbing/sanitary Roughing-ins. C. Site Works 1. The Master Site Development Plan Of The Hospital Shall Include The Following:  Contour And Survey Of The Lot, Including Bearing And Distance Of The Property Line  Road Network And Curbs And Sidewalks  Parking Spaces  Reference Location Of Existing Trees  Reference Location And Footprint Of Existing Buildings, With The Corresponding Building Names And Dimensions, Including Distances Between Adjacent Buildings, And Distances Between Buildings And The Nearest Property Line  Reference Location Of Utilities, E.g. Water Reservoirs, Septic Tank, Wastewater Treatment Plant, Powerhouse, Transformers, Waste Storage Area, Security Outposts 2. The Layout Of The Buildings On The Site Shall Be Zoned According To The Service It Provides:  The Outer Zone Shall Include All Front-line Services, E.g. Emergency, Out-patient, X-ray, Laboratory And Other Ancillary Departments.  The Inner Zone Shall Include The Wards.  The Deep Zone Shall Include Services Like The Operating Room, Delivery Room, Nursery, Intensive Care Unit And Other Sensitive Hospital Services.  The Service Zone Shall Include Non-medical Services But Are Essential To Hospital Operations, E.g. Staff Lounge And Lockers.  There Shall Be A Separate Road Network And Entry/exit For The Public And The Service Vehicles, E.g. Ambulance, Waste Collection Vans, Delivery Trucks.  In Limited Lot Areas, Buildings Should At Least Be Spaced Four (4) Meters Apart To Allow Natural Light And Ventilation.  Covered Walkways Shall Be Provided For Access And Connection To All The Buildings.  Ramps Shall Be Provided In All Main Entrances Of The Buildings And Other Access Openings To Walkways Leading To Other Buildings. D. Building Architectural Works 1. Floor Plans  The Structural, Sanitary, Plumbing, Electrical And Mechanical Designs Are Required To Refer To The Architectural Plans And Specifications In Case Of Discrepancies. If An Engineering Design Will Have Any Possible Conflict Or Interference On The Architectural Design, The Latter May Be Adjusted Provided That The Aesthetic Value Will Not Be Compromised.  The Architectural And Engineering Plans Shall Be Consistent All Throughout In Terms Of Dimensions And Locations Of Columns, Beams, Walls, Roof Line, Conduits, Ducts, Pipes, And Fixtures, Among Others. Column And Beam Grid Lines Shall Also Be Consistent In All The Architectural And Engineering Plans.  Verify And Coordinate Floor Plans With The Mechanical, Electrical And Sanitary Design With Regard To The Requirements For Mechanical Rooms, Ahu Rooms, Electrical Rooms, Pipe Chase, And Other Engineering Requirements.  Public Toilets Shall Have Provisions And Fixtures For Persons With Disability As Required By Bp 344. If Enough Space Allows, Toilets Specially Made And Designated For Persons With Disability Is Preferable. 2. Walls  Exterior Walls Shall Be 200mm. Thick, While Interior Walls Shall Be 150mm. Thick. This Is Indicative Of The Finished Wall Thickness Including The Plastering And Tile Works.  Used Soundproofed Wall Materials For Areas With Indicated “soundproofed”. Walls With An Stc Rating Of At Least 45-50 Is Recommended. In Areas Where High Confidentiality Or Privacy Is Required (e.g., Patient Rooms, Doctor’s Offices Near Noisy Zones), Consider An Stc Rating Of 55-60.  Double Layer Of Drywall: Use Two Layers Of Drywall On Either Side Of A Metal Or Wood Stud Frame For Enhanced Soundproofing.  Acoustic Insulation: Use High-density Insulation Like Mineral Wool Or Acoustic Fiberglass In Wall Cavities To Absorb Sound.  Higher Mass: Increase The Wall's Mass With Materials Like Masonry Or High-density Concrete, Which Can Significantly Reduce Sound Transmission.  Toilet Wall Tiles Shall Be 300mm. X 300mm. For Areas Of Six (6) Square Meters Or Below. Toilet Wall Tiles Shall Be 300mm. X 600mm. For Areas Above Six (6) Square Meters.  Layout And Work On Wall And Floor Tiles Must Be Aligned, Plumb, Level, And Square.  All Edges, Corners And Intersections Of Toilet Tiles, Including The Top-most Tile Not Reaching The Ceiling Shall Be Provided With Polyvinyl Chloride Tile Trims.  Tile Color And Design Shall Be Approved First Before Installation. 3. Floors  For Sterile Areas, Delivery & Nicu Complex, Floor Finish Shall Be Roll-form Anti-static Anti-bacterial Homogeneous Vinyl With Welded Joints. It Shall Cove Upwards To The Sides Of The Wall Up To A Minimum Of 200mm. From The Floor.  If Floor Tiles In Two Adjacent Rooms With Different Material, Color Or Design Meet At The Door Opening, The Cut Shall Be Located Middle Of The Door Thickness When In A Closed Position. Provide Details In The Floor Pattern Design.  Floors At The Openings Of Toilets For Persons With Disability Shall Be Sloping. Indicate In The Plans And Sections.  The Size Of The Toilet Floor Tiles Shall Be 300mm. X 300mm. For Areas Of Six (6) Square Meters Or Below. Toilet Floor Tiles Shall Be 300mm. X 600mm. For Areas Above Six (6) Square Meters. Indicate The Tile Pattern.  The Size Of The Pantry/lounge Floor Tiles Shall Be 600mm. X 600mm. Indicate The Tile Pattern.  The Size Of The Floor Tiles Of The Offices And Wards Shall Be 600mm. X 600mm, Or Bigger Depending On The Proportion To The Size Of The Room. Indicate The Tile Pattern.  The Size Of The Floor Tiles Of The Lobby And Corridor Shall Not Be Less Than 400mm. X 400mm. The Tile Size Of 600mm. X 600mm. Is Recommended For Bigger Areas. Indicate The Tile Pattern.  Layout And Work On Wall And Floor Tiles Must Be Aligned, Plumb, Level, And Square.  All Edges, Corners And Intersections Of Toilet Tiles, Shall Be Provided With Polyvinyl Chloride Tile Trims.  Tile Color And Design Shall Be Approved First Before Installation. 4. Ceiling Works  The Following Rooms Shall Have A Minimum Ceiling Height: A. Operating Room – 3000mm., To Accommodate The Ceiling-mounted Or Light B. Wards Of 4 Beds And Up – 3000mm., To Provide Better Natural Ventilation  Ceiling Height For Areas With Special Aesthetic Treatment, E.g. Lobby, Major Conference Room, Auditorium, Executive Office, Shall Be Proportional To The Area Or Room Or As Required By The Designer. However, This Shall Not Be Lower Than 2700mm. Provide Details.  If Acoustic Boards On Aluminum T-runners Would Be Used For The Ceiling, Layout Should Be On Center And Avoiding Cut Pieces. If The Remaining Perimeter Of The Ceiling Is Less Than 600mm. Wide, It Shall Be Designed Complimentary With Fiber Cement Boards On Light Gauge Metal Furring. Likewise With Acoustic Boards In Big Areas, E.g. Offices, And Wards, Shall Be Designed In A Way To Break The Redundancy. Provide Details.  Soffit Of Exterior Beams And Slabs Shall Have Drip Moulds To Prevent Damage Due To Water Sipping Into The Eaves Or Ceiling. Section Details Shall Be Required To Show The Drip-mould.  Acoustic Panels: Adding Absorptive Finishes, Such As Fabric-covered Acoustic Panels, Can Help To Dampen Internal Reflections And Improve Sound Quality Within Rooms, Although These Don’t Block Sound But Reduce Reverberation.  Non-cove Light Placement: Instead Of Cove Lighting, Use Flush-mounted Lighting Directly In The Ceiling With Sealed Housings That Prevent Dust Buildup. Fixtures Should Be Durable, Non-reflective, And Easy To Clean Without Requiring Special Maintenance Procedures. 5. Doors And Windows  Major Rooms That Require Security Shall Have Sturdy Doors E.g. Wood Panel, And Metal.  Minor Rooms That Do Not Require Security Shall At Least Have Wood Flush Doors.  Toilets And Other Wet Areas Shall Have Steel Doors.  Heavy-use Doors, E.g. Operating Rooms, Delivery Rooms, Should Be Provided With Stainless Steel Kick Or Push Plates And Door Closers.  Fire Escape Doors Should Be Provided With Panic Hardware And Door Closers, And Shall Conform With The Requirements Of The Fire Code Of The Philippines.  Aluminum Frames Of Glass Doors Shall Be Powder-coated.  Door Finish And Color Shall Be Approved First Before Application.  Window Sills Shall Be Slightly Sloped Outwards To Prevent Damage To Windows And Paint Due To Water Seepage. Section Details Shall Be Required To Show This Slope.  All Doors Of A High-occupancy Room Shall Swing Outwards And As Required By The Fire Code Of The Philippines.  Door Jambs With No Moulding/casing Installed On Concrete Walls Shall Have Construction Grooves All Around. Provide Details.  All Doors And Windows Shall Have Reinforced Concrete Lintel Beams. Provide Details.  Door Seals And Frames: For Soundproofed Rooms, Also Use Solid-core Doors With Perimeter Seals To Prevent Sound From Leaking Through Door Frames. 6. Stairs, Ramps And Corridors  Ramps For Persons With Disability Shall Have A Slope Not Higher Than 1:12. Handrails And Clearances Shall Conform With The Requirements Of Bp 344.  Regular Stairs Shall Have Risers At 150mm. High And Treads At 300mm. Wide. Fire Stairs Could Have A Maximum Riser At 200mm. And Tread At 250mm. Handrails Shall Be 1100mm. High. Clearances Shall Conform With The Requirements Of The Fire Code Of The Philippines.  Corridors Shall Have A Minimum Unobstructed Width Of 2450mm. This Shall Be Measured Clear From The Surface Of The Finished Wall And Not On-center Of The Rough Chb Wall.  Corridors Shall Not Be Areas For Temporary Or Permanent Storage Of Stretchers, Wheelchairs, Trolleys, Food Carts, Oxygen Tanks Or Other Movable Hospital Equipment. Storage Or Parking Spaces Shall Be Provided For These.  Corridors And Exit Doors Shall Conform With The Requirements Of The Fire Code Of The Philippines. 7. Fixtures And Accessories  Three-way Electrical Light Switches Shall Be Provided At The Foot And The Top Of The Stairs Per Floor. Likewise, At Both Ends Of A Long Corridor.  Electrical Light Switches Shall Be Located By The Knob Side Of The Door.  Electrical Switches And Outlets Shall Be Installed Plumb And Level.  Public Toilets Shall Always Be Provided With Heavy-duty Soap Dispensers And Electric Hand Dryers.  Public Toilets Shall Always Be Provided With Stainless Steel Handrails In Conformity To The Requirements Of Bp 344.  A Drainage Line Shall Be Provided For Window-type Air Conditioners. Likewise, Split-type Air Conditioners Located In The Interior Part Of The Building Shall Be Located Adjacent To Areas With Drainage Lines, E.g. Toilets, Downspouts, Balconies.  Seal Gaps And Openings: Ensure All Joints, Gaps, And Penetrations (e.g., Electrical Outlets, Ducts) Are Sealed With Acoustical Caulk Or Gaskets To Prevent Sound Leakage.  Sterile Area Lighting Type: Use Sealed, Recessed, Or Surface-mounted Led Fixtures That Are Flush With The Ceiling Surface To Prevent Dust Accumulation. 8. Roofing Works  The Section Of The Roof Gutters Shall Be Designed, In Case Of A Clogged Downspout, So That The Overflow Of Water Will Be Directed Outside Of The Building And Not Towards The Eaves Or Interior Ceiling To Prevent Any Damage. Provide Details.  Avoid Valley Or Inside Gutters In Roof Design. But In Cases Required In Aesthetic Design, Valley Or Inside Gutters Shall Be In Stainless Steel Or Concrete Gutters With Membrane-type Waterproofing, And The Section Shall Be Designed With A Capacity For Big Volume To Prevent Any Damage Due To Overflow. Provide Details.  Parapets, Designed As A Roof Protection From The Winds, Must Be Designed To Satisfy The Preceding Parameters. Provide Details.  The Slope Of The Roof Shall Not Be Less Than 30 Degrees. 9. Painting  Painted Ceiling Shall Be In Flat Latex Finish, While Cornices And Mouldings Shall Be In Gloss Enamel Finish.  Painted Interior Wall Shall Be At Least In Semi-gloss Latex Finish For Ordinary Rooms, E.g. Offices, Unless Specified To A Higher Type Of Paint.  Patient-related Rooms, E.g. Emergency Rooms, Out-patient Departments And Wards, Shall Be In Anti-bacterial And Odor-absorbent Paint Finish.  Special Rooms, E.g. Operating Rooms, Delivery Rooms, And Laboratories Shall Also Be In Anti-bacterial And Odor-absorbent Paint Finish.  Painted Exterior Wall Shall Be At Least In Moisture-resistant/water-repellent Solvent-based Paint Finish, Textured Or Smooth, Unless Otherwise Specified.  Paint Color And Shade Shall Be Approved First Before Application. D. Specific Requirements 1. Provide Spot Detail Plans And Sections Of The Following:  Gutter, Eaves, And Parapet  Ceiling - Covelight, Special Connections And Design, Mouldings, Valances  Stairs - Handrail, And Baluster Design  Ramps - Handrail Design And Floor Pattern  Doors, Windows And Gates - Grille Works,  Special Architectural Treatment And Design, E.g. Façade Design, Special Window And Door, Counter/nurse Station Counter  Special Carpentry Works, E.g. Partitions, Cabinetry  Building And Room Signages And Wayfinding Systems  All Pwd Toilets Shall Be Labelled “all Gender / Pwd Toilet”  Other Details As May Be Required 2. Provide Room Data Sheets, Including Detail Floor Plan, Ceiling Plan And Sections Of The Following Rooms, In Coordination With The Requirements Of The Electrical, Sanitary And Mechanical Designs: A. Private Wards, Including Bed Head Panel Fixtures And Outlets With Specific Dimensions Of The Location Of Fixtures And Accessories, And In Coordination With The Requirements Of The Electrical And Mechanical Engineering Design. B. Nurse Station C. D. (all Blanks Shall Be Filled As Required By Or Applicable To The Project.) E. Summary Of Materials  Materials To Be Used Shall Be Fire-resistant, Non-toxic, Moisture-resistant And Termite-resistant, E.g. Fiber Cement Board, Light-gauge Steel Frame, Polyvinyl Chloride Ceiling Panels.  Wet Areas, E.g. Toilets, And Pantry/lounge Shall Use Non-skid/non-slip Vitrified Ceramic Floor Tiles.  Heavy Traffic Areas, E.g. Lobby, And Corridor Shall Use Heavy-duty Seamless Granite Floor Tiles Or A Higher Type Of Floor Material.  Vinyl Floor Tiles For Sterile Areas Of Delivery & Nicu Suite Shall Be Homogenous And Not Less 3mm. Thick.  Ramps And Stairs Shall Use Non-skid/non-slip Floor Tiles, Materials As Specified.  Aluminum T-runners Shall Be Powder Coated.  Metal Rod Hangers With Adjustable Clips, And Not Galvanized Iron Wires, Shall Be Used To Support And Suspend The Aluminum T-runners And Light Gauge Metal Furrings.  Roofing Sheets Shall Be Ga.# 24 Aluminum-coated, Pre-painted, And Pre-formed. F. Drawing Requirements: See Attached Doh Checklist Of Drawings. -end Of Architectural Design Parameters- Xv. Design Parameters (structural/civil Works) A. Codes And Standards The Civil/structural Design Shall Be In Accordance With The Following Codes And Standards  Codes 1. National Structural Code Of The Philippines (nscp) 2010 2. National Building Code Of The Philippines And Its Revised Irr 3. Accessibility Law 4. Local Codes And Ordinances  Standards 7. Bureau Of Product Standards (bps) 8. Philippine National Standards (pns) 9. Dpwh Blue Book 10. American Concrete Institute (aci) 11. American Society For Testing Materials (astm) 12. American Welding Society (aws) B. Site Works Based On The Master Site Development Plan Of The Hospital, Provide Where Applicable Complete Design And Details Of Hospital Road (concrete With Curb And Gutter, Including Drainage) Network, Walkways, Parking Areas And Fencing. 1. The Main Hospital Road Shall Be Capable Of Two-way Traffic (at Least 6mts. Width) With A Minimum Thickness Of 150mm (8 Inches). Concrete Strength Should Be At Least 3000psi. Interior Roads (leading To Support Facilities) Shall Be Designed To Accommodate Delivery Vehicles, And Fire Trucks In Case Of Emergency. 2. Walkway Should Be At Least 100mm Thk. With Concrete Strength Of 2500psi. Ramps Should Be Provided, Instead Of Steps, For Any Change In Elevations. 3. Parking Area Slabs Should Be At Least 150mm Thk. With Concrete Strength Of 3000psi. 4. Fences Should Be Seen Through In Front Of The Hospital While The Tree (3) Other Sides Should Be Concrete Hollow Blocks With Minimum Height Of 2 Meters And To Be Provided With Perimeter Lighting. See-through Fence Design Will Be Made Of 32mm Square Bars Spaced At 100mm On Center And Provided With Three (3) Concrete Hollow Blocks (45mm High) Zocalo Walls. C. Buildings 1. The Hospital Buildings Should Be Designed Using A Seismic Importance Factor Of 1.5 For The Immediate Occupancy Category. Buildings Should Be Designed In Accordance With Nscp Requirements Up To Magnitude 7 For Those Near Seismic Source Type A. Seismic Gaps Between Buildings (old And New) Should Be Properly Observed. 2. The Hospital Buildings Should Be Designed Also Using Wind Importance Factor Of 1.15 (especially For Design Of Trusses/roofing System). Concrete Gutters And Parapet Walls Should Be Provided As Additional Protection To The Roofing System During Strong Typhoons. Wind Velocity Of 300-350 Kph Shall Be Considered Upon The Recommendation Of Structural Engineer 3. The Structural Designer Should Verify With Philippine Volcanology And Seismology (phivolcs) The Distance Of The Proposed Hospital To Nearest Active Fault Lines And With The Denr For Geo-hazard Mapping. 4. Soil Investigation (at Least Three Boreholes) Should Be Conducted To Determine Soil Bearing Capacity And Recommended Foundation Design (applicable Even For One Storey Structure). 5. The Structural Designer Is Encouraged To Use Fire-resistive And Non-toxic Materials. D. Details – The Following Shall Be Provided: 1. Connection Details Of Beams And Columns Following The Requirements Of Nscp On Confined Areas. 2. Connection Of Trusses To Beams And Columns. 3. Splicing Details Of Reinforcing Bars On Columns And Beams And The Required Bar Cut-off Points. 4. Details For Connection Of New Construction & Old Construction Structural Members Such As Expansions Joints For Thermal Expansion/contraction. 5. Include Thermal Expansion/contraction Prevention Methodologies Specifically On Soft Joints Areas Between Structural And Architectural Members. E. Summary Of Materials 1. Concrete Shall Be Portland Cement And Conforming To Astm Specification C150, Type I To Type Ii 2. Coarse Aggregates Shall Consist Of Washed Gravel, Crushed Stone Or Rock Or A Combination Thereof Conforming To Astm C33 3. Concrete Hollow Blocks Shall Be A Standard Product Of Recognized Manufacturer Conforming To Pns 16 With At Least 350psi Strength. 4. Reinforcing Bars Shall Conform With Pns Grade 60 For 16mm Dia. And Above And Pns Grade 40 For 12mm Dia And Below. 5. Structural Steel Shall Conform With Astm A36/a6m 6. Bolts And Studs Shall Conform With Astm A 325 7. Welding Electrodes Shall Be E60 Or E 70 And Conform With Aws F. Drawing Requirements: See Attached Checklist -end Of Structural/civil Works Design Parameters- Xvi. Design Parameters (sanitary/plumbing Works) A. Codes And Standards The Sanitary/plumbing Design Shall Be In Accordance With The Following Codes And Standards.  Codes: 1. National Building Code Of The Philippines And Its New Irr 2. Fire Code Of The Philippines 3. National Plumbing Code Of The Philippines (npcp) 4. Sanitation Code Of The Philippines 5. Existing Local Codes And Ordinances.  Standards: 1. Bureau Of Product Standards (bps) 2. Philippine National Standards For Drinking-water 3. Underwriters Laboratory (ul) 4. Doh National \ Laboratory (nrl) 5. Doh Health Care Waste Management Manual 6. National Water Resources Board (nwrb) 7. National Plumbers Association Of The Philippines (nampap) 8. Philippine Society Of Sanitary Engineers, Inc. (psse) B. Site Works  Based On The Master Site Development Of The Hospital, The Site Works Shall Provide Complete Layout Of The Following: 1. Storm Drainage Network, Indicating Drainage Manholes And Pipe Culvert; 2. Sewerage Pipe Network, Indicating Sewage Manholes, Sewage Pipes And The Location Of The Proposed Sewage Treatment Plant; And 3. Water Supply Network, Indicating The Location Of Water Service Entrance, Cisterns, Elevated Water Tank And Proposed Pump House.  The Storm Drainage Network Shall Accommodate The Magnitude Of Peak Rates Of Surface Run-off Including Drainage Coming From The Buildings. The System Shall Be Capable Of Handling The Design Flows Routing To The Designated Outfall; For Rainfall Calculation And Sizing Of Drainage Pipes, Refer To Table-d2, Appendix-d, National Plumbing Code Of The Philippines And Current Rainfall Record From Pagasa.  The Sewerage Pipe Network Design Shall Accommodate All Sewage Coming From All The Facilities, Conveyed By Gravitational Flow Leading To The Sewage Treatment Plant; Per Capita Wastewater Demand: 100-130 Gal/capita/day Per Bed C. Building Facilities Sanitary/plumbing System 1. Sewer Line And Vent System  Provide Complete Sewer Line And Vent System From All (domestic) Plumbing Fixtures And Floor Drains, Laid By Gravity Flow Leading To The Sewage Treatment Plant (stp);  For Demand Weight Of Fixtures In Fixture Units; Refer To Appendix A, Table A-2, Npcp 2. Wastewater Line And Vent System  For All Wash Areas Dealing And Generating With Oil/grease, Provide Separate Wasteline And Vent System And Solely Tap To The Proposed Grease Trap And Then Connect Its Effluent To The Sewage Treatment Plant.  For Estimated Demand Weight Of Fixtures In Fixture Units; Refer To Appendix A, Table A-2, Npcp Waterline System  Provide Complete Cold Water Supply Pipes To All Plumbing Fixtures. From The Main Water Source, The Water Shall Be Pumped To The Elevated Water Tank (ewt) And Conveyed To The Fixtures By Gravity System And Or Distributed To Fixtures By Transfer Pumped With Constant Pressure Through A Pneumatic Storage Tank, Whichever Is Feasible. 4. Storm Drainage System  Complete Storm Drainage System Shall Be Provided For All Roofs, Canopies, Concrete Ledges And Balconies Including Condensate Drains Laid For Gravity Flow Connected To A Leader/pipe Line Leading To The Natural Ground Level Storm Drainage Network. D. Specific Requirements  Provide Details Of The Following: 1. Fiberglass Pressure Tank (80g Minimum Capacity With Shallow Well Jet Pump Of At Least 1.5 Or 2 Hp) Located At Roof Deck 2. Stainless Steel Storage Tanks, Grade 304 Located At Roof Deck E. Summary Of Materials  Sewer And Vent Pipes; Unplasticized Polyvinyl Chloride (upvc) Extra Series 1000 (conforming To Iso 3633 Astm D2729 Including Trims And Fittings)  Storm Drainage Pipes; Downspouts, Unplasticized Polyvinyl Chloride (upvc) Extra Series 1000 (conforming To Iso 3633 Astm D2729 Including Trims And Fittings, Bps Certified)  Drainage Pipes; 250mm Dia. And Below, Non-reinforced Concrete Pipe (nrcdp)  300mm Dia. And Above, Reinforced Concrete Pipe (rcdp)  Drainage Manholes; Street Inlet, Curb Inlet, Traffic Type Reinforced Concrete Area Drain/catch Basin, Reinforced Load Bearing Chb  Sewage Manholes; Traffic Type Reinforced Concrete With Standard Steel Brass Cover  Wastewater Pipeline; Extra Heavy (xh) Single Hub, Hub Less Cast Iron Pipes And Fittings (cip) Conforming To Astm Standard 888  Cleanouts; Cast Iron Brass With Countersunk Plug (bps Certified)  Floor Drains/deck Drains; Cast Iron Brass (bps Certified)  Gutter Drains; Cast Iron Dome Type Brass (bps Certified)  Cold Waterline Pipes; For Buildings, Polypropylene Pn10 Fusion Weld Pipes Including Trims And Fittings (bps Certified)  Hot Waterline System; For Buildings, Polypropylene Pn20 Fusion Weld Pipes Including Trims And Fittings (bps Certified)  Trench Grating; Galvanized/stainless Steel Iron Grates  Plumbing Fixtures Including Trims, Fittings And Accessories; (bps Certified)  Water Closet-tank Type Push Button Flush  Lavatory - (pedestal/counter Type) With C-spout Spray Faucet  Kitchen Sink-ga#16 Stainless Steel Seamless Bowl With Gooseneck Faucet  Urinal-wall Hung Flush Valve Type  Plumbing Fixtures At Sterile Areas; A. Scrub-up Sink-ga#16 Stainless Steel (single/double Bowl) Compartment With Knee Operated And Or Censor Controlled Spay Faucet B. Surgical Soap Dispenser-ga#16 Stainless Steel Foot Operated C. Laboratory Sink-ga# 16 Stainless Steel Deep Seated Seamless Bowl Compartment With C-spout Spray Faucet F. Drawing Requirements: See Attached Doh Checklist Standards Based On Revised Irr Of The National Building Code Of The Philippines (pd 1096) -end Of Sanitary/plumbing Works Design Parameters- Xvii. Design Parameters (mechanical Works) A. Codes And Standards The Mechanical Design Shall Be In Accordance With The Following Codes And Standards.  Codes: 1. National Building Code Of The Philippines And Its New Irr 2. Fire Code Of The Philippines 3. Mechanical Engineering Code Of The Philippines (me Code) 4. Existing Local Government Codes And Ordinances.  Standards: 1. Bureau Of Product Standards (bps) 2. Philippine National Standards (pns) 3. Underwriters Laboratory (ul) And Factory Mutual (fm) 4. International Electrotechnical Commission (iec) 1988 5. National Fire Protection Association (nfpa) 6. National Fire Protection Association (nfpa) 99 Standard For Health Care Facilities. 7. American Society Of Heating, Refrigeration And Air Conditioning Engineers (ashrae). 8. Center For Disease Control And Prevention (cdc) Manual. B. Automatic Fire Sprinkler System  The Automatic Fire Sprinkler System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. Site Development Plan And Vicinity Map, Indicating The Location Of The Buildings, Firewater Reserve Tank, Firewater Line, Yard Loop And Private Fire Hydrant. 2. General Notes, Legends And Symbols Including Schematic Diagram Of The Fire Sprinkler System And Schematic Diagram Of Alarm Monitoring System. 3. Floor Layout And Isometric Layout Of The Automatic Fire Sprinkler System Indicating Pipe Sizes And The Location Of The Pipes, Valves, Sprinkler Heads, Riser Nipples, Fire Hose Cabinets, Sprinkler Main Riser, Drain Pipes, Cross Mains, Branch Lines, Inspector’s Test Connections, Hangers And Sway Braces. 4. Equipment Schedule, Detail Drawings, Fire Pump And Jockey Pump Layout. 5. Architectural, Structural, Electrical And Plumbing Drawings Of The Firewater Tank And Pumphouse.  An Automatic Fire Sprinkler Shall Be Provided In All Hospital Building Except For Those Fire Resistive One-storey Hospital Building.  Hazard Classification Shall Be Light Hazard Occupancy.  Area Of Coverage Shall Be 146 Square Meters And Water Density Shall Be 4.07 Lps/sq. M.  Protection Area Per Sprinkler Head Shall Be 20 Square Meters At 2.2 Meters Minimum Distance Between Sprinklers And 4.2 Meters Maximum Spacing.  All Floor Control Valves Shall Be Equipped With Supervisory Switch, Water Flow Detector And Drain System.  Water Supply Shall Be Horizontal Split Case Centrifugal Fire Pump With Diesel Engine Or Ac Motor And A Vertical In-line Jockey Pump With Controller.  Firewater Reserve Tank Shall Be Ground Level Monolithic Concrete Tank Sized For A Minimum Of 30 Minutes.  Hydraulic Calculations Report Shall Be Based On Npfa-13 Format. C. Ventilation And Air Conditioning System  The Ventilation And Air Conditioning System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. General Notes, Legends And Symbols Including Schematic Diagram Of The Ventilation And Air Conditioning System. 2. Floor Layout Of The Ventilation And Air Conditioning System Indicating The Capacity And Location Of The Air Conditioners And Fans. 3. Duct Layout Indicating Duct Sizes, Route And Location Of The Dampers, Diffusers, Return Air Register, Hangers And Sway Braces. 4. Refrigerant Piping Layout Indicating Pipe Sizes, Location Of Valves, Hangers And Sway Braces. 5. Equipment Schedule And Details Drawings Of Air Conditioners And Ventilating System.  Air Conditioning System Shall Be Provided In All Patient’s Private Rooms, Operating Rooms, Delivery Rooms, Offices And Other Areas Where Conditioned Air Is Necessary.  Cooling Load Calculations Report Shall Be Manual Or Computer Generated, Hourly Analysis Program Which Includes Heat Transmission Coefficients, Solar Heat Gain Factors And Corrected Cooling Load Temperature Difference Calculations.  Split Type Air Conditioners Will Be Used At Areas With Larger Capacities.  Window Type Air Conditioners Shall Be Used In Areas With Exterior Wall Exposure.  Centralized Air Conditioning Will Be Used As Indicated On Space Requirements (e.g. Sterile Hallways).  Maintain An Air Change Rate Greater Than Or Equal To 12 Air Changes Per Hour Or 145 Liters Per Second Per Patient.  Ceiling Cassette Type Exhaust Fans With Integral Air Diffuser Shall Be Provided In All Toilets.  Ceiling Fans, Orbit Type With 360° Oscillation Shall Be Provided In All Non-air-conditioned Rooms, As Mentioned On Space Requirements. D. Summary Of Materials 1. Automatic Fire Sprinkler System A. The Fire Pump Shall Be Ul Listed/fm Approved, Diesel Engine Or Electric Motor Driven, Designed Specifically Intended For An Automatic Water Sprinkler Protection System. B. The Jockey Pump Shall Be Ul Listed/fm Approved, Electric Motor Driven, 220v, 3-phase, 60 Hertz, And Electric Power Connection. C. Sprinkler Head Shall Be Ul Listed/fm Approved, Pendant, Upright Or Sidewall Unit, 83 Lpm Flow Capacity Per Head And Temperature Fusing At 57.5° C To 74°c. D. The Alarm Assembly Shall Be Ul Listed/fm Approved, Constructed And Installed That Any Flow Of Water From The Sprinkler System Equal To Or Greater Than That From The Single Automatic Head Shall Result In An Audible And Visual Sign In The Vicinity Of The Building. E. Alarm And Supervision System Of The Automatic Water Sprinkler Shall Include The Monitoring Water Flow Switch At Each Floor Of The Building, Fire Pump And Jockey Pump Running Condition And Power Supplies, Level Of Water In The Reservoir And Control Valves. F. Pipes Shall Be B.i. Schedule 40. Screw Fittings Shall Be Used For Inside Piping. 2. Air Conditioning And Refrigeration System A. Refrigerant Pipes Shall Be Copper Tubing, Type L Or K Black Steel Pipe, Schedule 40 For Size Of 100mm Diameter And Smaller. Pipe Over 100mm Shall Be Black Steel Pipe Schedule 40. B. Black Steel Pipes Shall Be Standard Seamless, Lap-welded, Or Electric Resistant Welded For Size Of 50mm Diameter And Larger, Screw Type For Size 38mm Diameter And Smaller, Fittings For Copper Tubing Shall Be Cast Bronze Fitting Designed Expressly For Brazing. C. Pipe Insulation Shall Be Performed Fiberglass Or Its Equivalent. The Insulating Materials Shall Be Covered With 100mm X. 13mm Thick Polyethelene Film, Which Shall Be Overlapped Not Less Than 50mm. D. Ducts Shall Be Galvanized Sheet Steel Of Standard Gauges. E. Ductwork Insulation Materials Shall Be Rigid Board Made Of Styropor Or Equivalent 25mm Thick For Ground And Top Floor, 13mm Thick For Intermediate Floor. -end Of Mechanical Works Design Parameters- Xviii. Design Parameters (electrical/auxiliary Works) A. Codes And Standards The Electrical System Design Parameters Shall Be In Accordance With The Following Codes And Standards.  Codes: 1. Philippine Electrical Code 2. National Electrical Code 3. Fire Code Of The Philippines 4. National Building Code Of The Philippines And Its New Irr 5. Existing Local Codes And Ordinances  Standards: 1. Bureau Of Product Standards (bps) 2. Underwriters Laboratory (ul) 3. National Fire Protection Association 4. International Electrotechnical Commission (iec) 5. Illumination Engineering Society (ies) 6. National Electrical Manufacturer’s Association (nema) 7. Doh Manual On Technical Guidelines For Hospital And Health Facilities Planning And Design B. Building Facilities Electrical System 1. Lighting System  Provide And Install Adequate Normal Branch Circuits For Lighting System To All Areas Using The Standard Lighting Design Analysis. Utilize The Standard Illumination Requirements Per Area Of Concern Using The Preferred Particular Type Of Luminaires. 2. Power System  Provide And Install Adequate Normal Branch Circuits For The Power System. 3. Standby/emergency System  Provide And Install Adequate Life Safety And Critical Emergency Branch Circuits For Lighting Or Utilization Equipment Connected To The Alternate Power Source. 4. Auxiliary System Provide And Install The Following Auxiliary System:  Communication System A. Telephone System B. Local Area Network System C. Public Address Paging System D. Private Branch Exchange (pabx) E. Nurse Call System F. Master Or Cable Antenna Television  Fire Alarm System  Security System 5. Lightning Protection System  The Building Lightning Protection System Shall Include Roof-mounted Air Terminals Grounding Conductors, Ground Rods, Conduits, Clamps, And Auxiliary Equipment As Required For A Complete And Operational Lightning Protection System. 6. Provide Details Of The Following:  Lighting Fixtures/luminaires  Panelboard And Circuit Breakers  Switchgear And Other Metering Devices  Electrical And Hospital Equipment  Installation And Termination Of Auxiliary And Other Special Devices And Equipment  Power And Telephone Handholes (as May Be Required)  Pedestal And Service Entrance To Bldg.  Grounding System Layout  Substation/power House And Electrical Room  Transformer And Generator Mounting  Others As May Be Required. C. Summary Of Materials  General Lighting Luminaries: Fixtures Type Shall Be As Indicated On The Lighting Layout Plan. 1. Fluorescent Lamp Shall Be Linear, Circular Or Self-ballasted Compact Fluorescent Lamps. 2. Fluorescent Lamps Shall Be Cool Or Warm White And 3. Lamp Holders Shall Be Made Of Thermosetting Plastic. 4. Fluorescent Ballast: Magnetic Or Electronic Type With High Power Factor Or High Frequency Energy Saving Type. 5. Fluorescent Fixture Housing Shall Be Steel Sheet With High Reflectance Powder Coat Paint Finish. 6. Downlights And Pin Lights Shall Be Of Heavy Gauge Spun Aluminum Equipped With Lamp As Indicated On The Drawings. 7. Other Special Lighting Requirements Shall Be As Approved By The Implementing Agency. 8. Sterile Areas/zones Lighting Specifications: A. Type: Use Sealed, Recessed, Or Surface-mounted Led Fixtures That Are Flush With The Ceiling Surface To Prevent Dust Accumulation. B. Lux Level: Aim For 300-500 Lux For General Sterile Areas; 1000 Lux Or More May Be Needed In Surgical Suites Or Examination Zones Or As Specified On Manual Of Technical Guidelines For Hospital Planning And Design (level 3)  Wiring Devices: Wiring Devices Shall Be Non-automatic Control Devices, The Contact Is Guaranteed By The Pressure Of The Special Spiral Springs. 1. Switches Shall Be Of 15a, 250v Or 300v Except As Otherwise Noted And Approved. Terminals Shall Be Screw-type Or Quick-connected Type. 2. General Use Receptacle Shall Be 15a, 240v Grounding Type Unless Otherwise Indicated On The Drawings. 3. Special Purpose Receptacles Shall Be As Called For On The Drawings. 4. Matching Plugs Shall Be Supplied.  Panelboards And Circuit Breakers: The Panelboard And Circuit Breakers Shall Be Equipped With Molded-case Circuit Breakers And Shall Be The Type As Indicated In The Panelboard Schedule And Details. 1. Provide Molded-case Circuit Breakers Of Frame, Trip Rating And Interrupting Capacity As Shown On The Drawings. The Circuit Breakers Shall Be Quick-make, Quick Break, Thermal-magnetic, Trip-indicating And Shall Have Common Trip On All Multiple Breakers With Internal Trip Mechanism. 2. All Current-carrying Parts Of The Panelboards Shall Be Plated. Provide Solid Neutral (s/n) Assembly When Required. The Assembly Shall Be Isolated From The Enclosure.  Electrical Conduits, Boxes And Fittings: All Conduits, Boxes And Fittings Shall Be Standard Rigid Steel, Zinc Coated Or Galvanized. 1. Rigid Steel Conduits (rsc) 2. Rigid Metal Conduits (rmc) 3. Intermediate Metal Conduits (imc) 4. Electrical Metallic Tubing (emt) 5. Unplasticized Polyvinyl Chloride (upvc) If Required Shall Be Schedule 40.  Conductors: Wires And Cables Shall Be Of The Approved Type And Unless Specified Or Indicated Otherwise, All Power And Lighting Conductors Shall Be Insulated For 600 Volts. 1. The Conductors Used In The Wiring System Shall Be Of Soft-annealed Copper Having A Conductivity Of Not Less Than 98% Of That Of Pure Copper And Insulated For 60° C Temperatures. 2. All Conduits Of Convenience Outlets And Wire-ways For Lighting Branch Circuit Home-runs Shall Be Wired With A Minimum Of 3.5 Mm Square In Size.  Nurse Call System: 1. The Nurse Call System Shall Have The Following Control Panel, Bed Head Panel, Ancillary Call And Annunciating Equipment. 2. Wiring Shall Consist Of Data Cable And 24v Supply To Each Bed Head Unit. 3. Two Levels Of Call Will Be Provided By The System: Patient To Nurse. A Patient To Nurse Shall Be Actuated By Means Of The Wall-mounted Or Handset Mounted Call A) Push Button Of Bed Head Panel. B) Nurse To Nurse. Call Of Nurse To Nurse Shall Be Considered, As Emergency Call And Shall Be Instigated By Operation Of The Emergency Pull/push Switch Mounted On Call Units Of Bed Head Panel. C) Bedhead Panel Shall Be Of Different Type Depending On The Patient Bedroom Class And As May Be Required. Multiplexed Bedhead Panel Shall Be Available To Operate Sound Distribution System. D) Bathroom Shall Be Provided With Pull Cord Unit And Reset Unit. E) Room Indicator Lamp Shall Be Installed Above The Door Of Each Patient’s Bedroom Along The Corridor. F) Nurse Stations Shall Be Equipped With Indicator Unit To Provide Indication (audible And Visual) Of The Zone And Type Of Call. G) Emergency Indication Shall Be Included In Some Acute Areas But Arranged “for Staff Use Only” In The Event Of Urgent Assistance Being Required. H) The System Shall Be Of Solid State Switching With All Items Connected To Internal Printed Circuit Boards Readily Interchangeable For Maintenance Purpose.  Master Antenna Television (matv) And Cable Television (catv) System: 1. Two Sources Of Tv Signals Shall Be Provided To The Building. One (1) Shall Be From A Master Antenna Installed At The Roof Or Within A Suitable Area Of The Building And The Other Will Be From A Commercial Cable Television Service. 2. The Master Antenna System Shall Consist Of Fm, Vhf And Uhf Antennas, Combiner, Distribution Amplifier, Coaxial Cables, Splitters, Tap-offs And Tv Outlets. 3. There Shall Be Individual Trunking For Master Antenna And Cable Television Rising In The Building.  Structured Cabling & Telephone System: 1. A Minimum Provision For Estimated 500 Mixed Pabx Extension And Direct Telephone Lines Shall Be Required For Tertiary Hospitals. 2. Final Details Of The System Shall Follow Specific Requirements, Quantity And Type Of Service.  Fire Detection And Alarm System: 1. The Fire Detection And Alarm System Shall Be Of Multiplex, Microprocessor- Controlled Addressable Or Zonal Conventional Fire Detection, Alarm And Communication System. 2. The System Shall Consist Of Full Integration Automatic Fire Detection, Voice Alarm Communication And Fire Fighters Telephone System. 3. The System Shall Consist Of Control Station, Mimic Panel Initiating And Indicating Devices, Control Modules And System Of Wirings. 4. Actuation Of The Protective Signaling System Shall Occur By Manual Pull Station, Automatic Smoke Or Heat Detector, Sprinkler Flow Switch And Tamper Switch. 5. The System Shall Be Able To Monitors The Status Of Flow Switches And Supervisory Switches Installed At The Sprinkler System Risers. These Monitoring Points Are Also Addressable Or The Conventional Zonal In The Same Way As The Detectors Are Making Them Easily Recognizable At The Control Panel. 6. Occupant Notification Shall Be Accomplished Automatically. Notification Will Be General, Audible Alarm Type Complying With Appropriate Section Of Nfpa. 7. The System Shall Be Installed With Provisions For Future Connection To The Nearest Fire Services Station In The Locality.  Security System: 1. The Security System Shall Include Intrusion Detection And Alarm, Cctv, Access Control Or As Maybe Required.  Ventilation And Air Conditioning System The Ventilation And Air Conditioning System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. General Notes, Legends And Symbols Including Schematic Diagram Of The Ventilation And Air Conditioning System. 2. Floor Layout Of The Ventilation And Air Conditioning System Indicating The Capacity And Location Of The Air Conditioners And Fans. 3. Duct Layout Indicating Duct Sizes, Route And Location Of The Dampers, Diffusers, Return Air Register, Hangers And Sway Braces. 4. Refrigerant Piping Layout Indicating Pipe Sizes, Location Of Valves, Hangers And Sway Braces. 5. Equipment Schedule And Details Drawings Of Air Conditioners And Ventilating System. A) Air Conditioning System Shall Be Provided In All Patient’s Private Rooms, Radiologic And Imaging Area, Operating Rooms, Delivery Rooms, Laboratories, Critical Care Areas, Offices And Other Areas Where Conditioned Air Is Necessary. B) Cooling Load Calculations Report Shall Be Manual Or Computer Generated, Hourly Analysis Program Which Includes Heat Transmission Coefficients, Solar Heat Gain Factors And Corrected Cooling Load Temperature Difference Calculations. C) Split Type Air Conditioners Will Be Used At Areas With Larger Capacities. D) Window Type Air Conditioners Shall Be Used In Areas With Exterior Wall Exposure. E) Centralized Air Conditioning Will Be Used Only If Feasible. F) Design Of All Critical Areas Shall Be Laminar Or Positive Pressure, Wherein The Supply Air Is 10% More Than Exhaust Air. G) All Infectious Isolation Rooms, Such As Tb And Sars, Shall Be Negative Pressure, Wherein The Exhaust Air Is More Than 10% Of The Supply Air. H) Maintain An Air Change Rate Greater Than Or Equal To 12 Air Changes Per Hour Or 145 Liters Per Second Per Patient. I) Ceiling Cassette Type Exhaust Fans With Integral Air Diffuser Shall Be Provided In All Toilets. J) Ceiling Fans, Orbit Type With 360° Oscillation Shall Be Provided In All Non-air-conditioned Rooms, Such As Patient Wards, Work Areas, Nurse Station, Etc.  Air Conditioning And Refrigeration System 1. Refrigerant Pipes Shall Be Copper Tubing, Type L Or K Black Steel Pipe, Schedule 40 For Size Of 100mm Diameter And Smaller. Pipe Over 100mm Shall Be Black Steel Pipe Schedule 40. 2. Black Steel Pipes Shall Be Standard Seamless, Lap-welded, Or Electric Resistant Welded For Size Of 50mm Diameter And Larger, Screw Type For Size 38mm Diameter And Smaller, Fittings For Copper Tubing Shall Be Cast Bronze Fitting Designed Expressly For Brazing. 3. Pipe Insulation Shall Be Performed Fiberglass Or Its Equivalent. The Insulating Materials Shall Be Covered With 100mm X. 13mm Thick Polyethylene Film, Which Shall Be Overlapped Not Less Than 50mm. 4. Ducts Shall Be Galvanized Sheet Steel Of Standard Gauges. 5. Ductwork Insulation Materials Shall Be Rigid Board Made Of Styropor Or Equivalent 25mm Thick For Ground And Top Floor, 13mm Thick For Intermediate Floor. -end Of Electrical Works Design Parameters- Xix. Design Parameters (green And Safe Health Facilities)  Codes And Standards Green And Safe Health Facilities Shall Be In Accordance With The Following Laws, Codes And Standards.  Global Initiatives & Developments: 1. World Health Assembly Resolution On Universal Health Care (2019) 2. World Health Resolution On Climate Change And Health (2008) 3. Un Resolution On Sustainable Development Goals (2015) 4. Global Action On Patients’ Safety  Laws And Codes: 1. Sanitation Code Of The Philippines Irr Of Chapter Xvii 2. The Local Government Code Of 1991 3. Clean Water Act Of 2004 4. National Building Code Of The Philippines (pd 1096) 5. General Appropriation Act Fiscal Year 2021 (ra 11518) 6. Occupational Safety And Health (ra 11058) 7. Safe Hospital Initiative (2011) 8. Universal Health Care Act (ra 11285) 9. Implementing Rules And Regulations Of Accessibility Law (ra 344) 10. Ecological Solid Waste Management Act Of 2000 (ra 9003) 11. Climate Change Act Of 2009 (ra 9729) 12. Other Related Standards A. Guidelines The Green And Safe Hf Initiative Represents A Climate Smart Paradigm Shift, Away From Traditional Disaster Response To One That Proactively Seeks To Minimize The Health Impact Of Disasters And Emergencies Through Climate Adaptation And Mitigation Measures (including Climate-proofing And Reduction Of The Environmental Footprint), And Preparedness. Consequently, It Is Essential That This Green Manual Is Incorporated Into The Hospital And Hf Development Agenda That Are Backed With Earmarked Resources In The National Budget, And That Has Governance And Support From The Highest Levels Of Government.  The Department Of Health Shall, As Much As Possible, Promote The Greening Of Hospitals And Health Facilities, Including The Improvement Of Energy And Water Efficiency And Conservation, Sustainable Cooling Systems, And Sustainable Healthcare Waste Management In Hospitals.  In Line With Its Continuing Efforts In Green And Safe Hfs, The Doh Shall Encourage National And Local Government Hospitals And Other Hfs To Seek Green Certifications From Green Building Rating System/s For Their New Construction Or Expansion, Repair And Renovation Projects. B. Criteria And Compliance System For Outstanding Green And Safe (climate Smart) Health Facilities.  Criterion Compliance 1. Governance – Leadership And Management, Trainings, Proper Implementation, Commitment 2. Energy Efficiency – Reduction Of Energy Consumption, Use Of Renewable And Clean Energies 3. Water Efficiency, Sanitation And Hygiene – Adequate Water, Water Reuse/recycling, Water Conservation, Rainwater Harvesting. Safe Drinking Water, Proper Use And Maintenance Of Sanitary Toilet Facilities 4. Health Care Waste Management Waste – Segregation, Collection, Storage, Transport, Treatment, Proper Waste Disposal, Recycling 5. Environmentally Resilient Health Facility – Structural Member, Non-structural Member, Emergency And Disaster Preparedness Plan 6. Site Sustainability – Healing Gardens Within, Fresh Air, Herbal Plants, Accessibility, Existence Of Alternative Routes 7. Material Sustainability – Use Of Sustainable Materials, Procurement Of Sustainable And Recyclable Products, Less Use Of Hazardous And Toxic Substances 8. Indoor Environmental Quality – Lighting, Ventilation, Interior Design, Air Quality Management C. Energy Efficiency  Orientate Building & Façade Design To Mitigate Heat Gain. The East And West Facades Receive The Greatest Solar Radiation, And Should Be Designed To Avoid Direct Sun.  Use Of Glass/glazing With A Lower U-value And Shading Coefficient Reduce Solar Heat Gain.  Allow Provision For Easy Access For Maintenance And Cleaning Especially For Curtain Wall System.  Consider Lifespan, Durability And Life Cycle-costing When Selecting Façade Materials.  Install And Use Energy-efficient Lighting Fixtures I.e. Led, Cfl, Slim Type Fluorescent, Etc.  Skylights (if Applicable) And Windows To Maximize Natural Lighting And Ventilation On Selected Areas. Utilizing Daylight As Possible.  Use Of Appliance With Inverter Technology With Variable Frequency Drive Technology.  Window And Door Assemblies Shall Have Complete Gaskets, Weather Stripping, Door Bottom Sweeps And Seals.  All Operable Windows Shall Be Provided With Safety Features For Protection Against Strong Winds, Water Penetration And Protection For Building Occupants Including Child Safety And Security.  Specific Air Exchange Rates Are Usually Attained Through Artificial Ventilation. Adequate Ventilation Throughout The Facility Contributes To Maintaining A Hygienic Environment. Presence Of Functional Windows And Doors, That Allow At Least 6-8 Air Changes Per Hour For Natural Ventilation. For Airborne Infection Isolation Room/s And Er/triage Areas, Greater Or More Than 12 Air Changes Per Hour Is Recommended, While Up To 15 Air Changes Per Hour May Be Recommended For Operating Procedure, Or Delivery Rooms.  Light-colored Building Envelopes Is Also Recommended To Reduce Heat Transfer From The Outside To Inside Of The Building By Having Surfaces With High Solar Reflectance Index (sri). D. Water Efficiency, Sanitation And Hygiene  Optimize Water Conservation Through Installation Of Rainwater Harvesting Cistern Tank  Use Of Waterless Urinals And Dual Flush Water Closets.  Use Of Low-flow & Water Efficient Faucet And Hand-held Bidets.  Use Of Water-saving Shower Heads  For Hospitals, There Must Be At Least One Water Closet For Every Eight Patients In Compliance With Ra 4226 – Hospital Licensure Act.  A Separate Toilet For Male And Female Is Preferred, And Shall Be Pwd Accessible. And, A Separate Toilet For The Staff, With A Provision Of One Toilet For Every Fifteen Personnel Shall Be Applied.  Waterless Urinals Must Be Provided For Male Toilets.  There Should Be Sufficient And Functional Hand-washing Facilities. E. Environmentally Resilient Health Facility  Ground Floor Must Be Above Ground Line And Anticipated Flood Level. F. Material Sustainability  Building Materials, If Applicable, Must Be Locally Sourced To Minimize Carbon Footprint.  Rapidly Renewable And Sustainable Materials Are Also Recommended. Refer To Sec. 16.3.4 Of Doh Green And Safe Health Facilities Manual For List Of Sustainable Construction Materials That Can Be Used.  Use Of Materials (specifically Wet-applied Materials) That Are Low In Vocs (volatile Organic Compounds) G. Site Sustainability  Adopt The Development Controls Indicated In The National Building Code Of The Philippines To Establish The Extent Of The Health Facility Site Can Develop.  Biophilic Design Is Recommended To Help Reduce Stress, Improve Cognitive Function And Creativity, Improve Patients’ Well-being And Expedite Healing.  Porous Pavement Is Recommended At The Site Development To Alleviate Flooding. Landscape Swales Is Also One Solution. H. Indoor Environmental Quality  Harvest Natural Daylight If Applicable.  Acoustic Quality, Especially In Areas/rooms That Needs To Be Soundproofed, Shall Be Maintained.  Use Of Acoustic Privacy Partitions Is Required.  Separate Entrances For Ambulances And Walk-in Patients.  In Procedure Rooms With Windowless Areas, Backlit Photomurals Or Artificially Illuminated Glass Artwork Can Alleviate Feeling Of Claustrophobia.  In Wards And Recovery Rooms, Provide Windows And Natural Illumination As Much As Possible.  Provide Acoustic Privacy In Patient Rooms, Offices, And Examination Rooms With Partitions Of Sound Transmission Class (stc) Of 45.  Noise Level In The Operational Rooms Must Follow The Minimum Noise Standards In Accordance To The Doh Manual Of The Technical Guidelines For Hospital Planning And Design (level 3) Drawing Requirements: See Doh Standard Checklist Based On Revised Irr Of The National Building Code Of The Philippines (pd 1096). Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation. -end Of Green And Safe Health Facilities Design Parameters- Xx. Build Aspect Furnish Labour, Materials, Equipment, Paint, Tools And Other Facilities To Complete The Entire Building Including Architectural, Structural/ Civil, Electrical, Mechanical, Sanitary, Communication, Fire Protection, And Other Related Works To Complete The Scope As Specified And/or As Shown On Drawings And Plans 1. General Requirement  Contractor’s Temporary Facility And Lay Down Yard.  Communication And Transmittal, Reproduction, Tarpaulin/billboard And Photos  Material Testing (rsb, Chb, Concrete, Steel)  Safety Requirements (warning Signs, Hardhat, Etc.)  As Built Plan  Demolition, Clearing Work, Permits And Licenses 2. Other Items Of Work  Demolition Of Existing Structures In Affected Areas Or Where The Proposed Project Shall Be Situated, Clearing And Disposal Of All Debris Generated During Construction.  All Serviceable Materials Shall Be Turn Over To Doh-dedvmh Through Its Representative  Soil Excavation And Soil Treatment  Restoration Of Any Damaged Properties During The Construction  Permit Fees, And Other Necessary Documents For The Project Shall Be Shouldered By The Contractor  Temporary Facilities Shall Be Provided During The Construction Period, To Be Constructed Within The Hospital Compound, Which Shall Serve As The Field Office, Storage Of Materials And Bunkhouse For The Workers.  No Implementation Of The Project Without An Approved Plan And Other Related Documents.  Strict Implementation Of (dole Guidelines And Other Standards Applicable) Health And Safety Rules.  Shall Abide By The Medical Center Hospital House Rules  Conduct Weekly Progress And Coordinative Report To The Agency Or Its Representative  Other Items Of Work Not Mentioned Herewith But It Is Very Necessary For Execution And Completion Or Works Shall Be Included And Charge To The Contractor 3. Pre-installation Requirements  All Tests To Be Conducted Shall Be Witnessed By The Hospital Representatives.  Soil Investigation  Concrete Strength Testing  Reinforcing Bar Strength Testing  Concrete Masonry Unit (cmu) Testing  All Plumbing And Sanitary System  Automatic Fire Sprinkler System  Ventilation And Air Conditioning System  All Electrical System  And Other Tests That Necessary To Perform To Ensure The Quality Of The Project  All Certifications And Reports Under Post-installation Requirement Shall Be Submitted To The Hospital Representatives.  The Contractor Shall Submit A Sample Of Materials For Approval Of The Medical Center Chief Prior To Installation.  No Implementation Or Execution Of Work In Any Discipline Without The Approval Of Medical Center Chief Or Through Its Representative  Any Request For Inspection, Approval, Concrete Pouring, Testing And Commissioning Must Be Address To Medical Center Chief Or Must Adhere To The Reporting Protocol As Mentioned Above. -end Of Build Aspect- Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Architectural Drawings (as Applicable) A – 1 (a…n) Perspective, Site Development Plan, Vicinity Map/location Plan (2.00 Kms. Radius) Table Of Contents A – 2 (a…n) Floor Plans (scale 1:100m Minimum) Including Furniture Layout When Necessary A – 3 (a…n) Four (4) Elevations (scale 1:100m Minimum) A – 4 (a…n) Two (2) Sections (scale 1:100m Minimum) Including Spot Details When Necessary A – 5 (a…n) Roof Plan/s Showing Downspouts (scale 1:100m Minimum), Including Detail Of Gutter, Downspout, Etc. A – 6 (a…n) Reflected Ceiling Plan/s (scale 1:100m Minimum), Including Details A – 7 (a…n) Details Of Stairs, Fire Escapes/exits, Accessible Ramps, Etc. (scale 1:50m), Including Details Of Railings, Treads, Risers, Etc., In The Form Of Plans, Elevation/section A – 8 (a…n) Details Of Toilets (1:50 M) Including Accessible Toilets In The Form Of Plans, Elevation/section A – 9 (a…n) Details Of Specialized Design Features (scale 1:50 M) Such As Partitions, Cabinets, Etc. And Accessible Design Features A – 10 (a…n) Detail Of Typical Bay Section From Ground To Roof (scale 1:50 M) A – 11 (a…n) Details Of Special Elevations/section Rooms (1:50m) In Form Of Plans, A – 12 (a…n) Schedule Of Doors, Gates, Emergency Exits, Etc. (scale 1:50 M), Including Specifications For Materials And Hardware A – 13 (a…n) Schedule Of Windows (scale 1:50 M), Including Specifications For Materials And Hardware A – 14 (a…n) Schedule Of Finishes For Interior And Exterior Floors, Walls, Ceilings Architectural Technical Specifications Architectural Scope Of Works Architectural Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 1 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Architectural Interior Design Drawings (as Applicable) Aid – 1 (a…n) Floor Plans Showing Layout Of Floor Finishes (scale 1:100m Minimum) Aid – 2 (a…n) Floor Plans Showing Layout Of Furniture/finishing Partitions, Cabinets, Etc. (scale 1:100m Minimum) Aid – 3 (a…n) Interior Elevations And Sections Showing Wall Patterns, Ceiling Sections, Etc. (scale 1:100m Minimum) Aid – 4 (a…n) Details Of Partitions, Cabinets, Furniture, Ceiling And Other Interior Design Features (scale 1:100m Minimum) Aid – 5 (a…n) Architectural Interior Perspective/s Architectural Interior Design Technical Specifications Architectural Interior Design Scope Of Works Architectural Interior Design Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 2 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Structural Drawings (as Applicable) S – 1 (a…n) General Notes And Construction Standards S – 2 (a…n) Site Development Plan S – 3 (a…n) Foundation Plan/s (scale 1:100m Minimum) S – 4 (a…n) Floor Framing Plan/s (scale 1:100m Minimum) S – 5 (a…n) Roof Framing Plan (scale 1:100m Minimum) S – 6 (a…n) Schedule And Detail Of Footings And Columns S – 7 (a…n) Schedule And Detail Of Beams And Floor Slabs S – 8 (a…n) Detail Of Trusses S – 9 (a…n) Details Of Stairs, Ramps, Fire Exits S – 10 (a…n) Other Spot Details Structural Analysis And Design (for 2 Storey Building And Higher) Boring And Land Test Results (for 3 Storey Building And Higher) Seismic Analysis Structural Technical Specifications Structural Scope Of Works Structural Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 3 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Electrical Drawings (as Applicable) E – 1 (a…n) General Notes And Legends E – 2 (a…n) Location And Site Plan E – 3 (a…n) Lighting Layout (scale 1:100m Minimum) Including Details E – 4 (a…n) Power Layout (scale 1:100m Minimum) Including Details E – 5 (a…n) Auxiliary System Layout (scale 1:100m Minimum) Including E – 6 (a…n) Schedule And Detail Of Loads E – 7 (a…n) Riser Diagram E – 8 (a…n) Other Detail Electrical Computation Design Analysis Electrical Technical Specifications Electrical Scope Of Works Electrical Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 4 Of 6 Electronics/auxiliary System Ready For Integrated Communications 1. Nurse Call System 2. Telephone System 3. Paging System 4. Lan System 5. Fire Alarm System 6. Security System Cctv 7. Integrated Communications And Systems Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Plumbing/sanitary Drawings (as Applicable) P – 1 (a…n) General Notes And Legends P – 2 (a…n) Location And Site Plan P – 3 (a…n) Storm Drainage Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line To Main Drainage Line P – 4 (a…n) Waterline Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line From Main Water Source When Applicable P – 5 (a…n) Sewerline Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line To Septic Tank Or Existing Sewerline P – 6 (a…n) Isometric Layout, Showing Waterline, Sewerline And Drainage Line P – 7 (a…n) Detail Of Connections, Catch Basins, Downspouts, Etc. P – 8 (a…n) Detail Of Septic Tank/sewer Treatment Plant Design Analysis Sanitary Technical Specifications Sanitary Scope Of Works Sanitary Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 5 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Mechanical Drawings (as Applicable) M – 1 (a…n) General Notes And Legends, Site Development Plan, Location Plans M – 2 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Showing Ventilation And Air Conditioning Systems And Other Installations M – 3 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Gas Pipeline System And Details M – 4 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Air-conditioning Systems And Details M – 5 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Fire Suppression Systems, Fire Sprinkler System, Wet Stand Pipe, Dry Standpipe And Other Installation M – 6 (a…n) Details Water Tank, Flow Diagram (scale 1:50m) M – 7 (a…n) Details Of Firewater Supply Sytem (scale 1:50m) M – 8 (a…n) Detail Of Elevators, Escalators, Dumbwaiters, Etc. (scale 1:50m) M – 9 (a…n) Detail Of Other Machinery/equipment (scale 1:50) M – 10 (a…n) Longitudinal And Transverse Section Of Building (scale 1:100m) Showing Manner Of Support Of Machines/equipment Mechanical Technical Specifications Mechanical Scope Of Works Mechanical Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 6 Of 6 General Guidelines • All Construction Works Shall Be Undertaken By Contractor In Accordance With Existing Laws And All Other Applicable Rules And Regulations. • The Contractor Shall Be Responsible In Setting Out Reference Lines, Elevations (lines And Grades) Prior And During The Execution Of The Works. All References Shall Be Maintained And Protected By The Contractor At His Own Expense. Disturbed References Shall Be Restored To Its Original Position Without Extra Cost To Devmh. • The Contractor Shall Carry Out The Works Properly And In Accordance With This Contract. The Contractor Shall Provide All Supervision, Labor, Materials, Plant And Equipment, Which May Be Required. • The Contractor Shall Commence Execution Of The Works On The Start Date And Shall Carry Out The Works In Accordance With The Approved Pert/cpm Network Diagram Submitted By The Contractor, As Updated With The Approval Of The Procuring Entity’s Representative, And Shall Complete The Works By The Intended Completion Date. • The Contractor Shall Be Responsible For The Safety Of All Activities On The Site. • During On-going Construction And Before The Turn-over Of The Project, Engineering & Facilities Management Staff, End-users, Twg And Bac Shall Inspect The Works Undertaken By Contractor. Hospital Engineers And End-users Discover Any Deviations By Contractor From The Approved Construction Plans, Contractor Shall Be Required To Rectify All Such Deviations, Within Such Period Required By Client. • Contractor Shall Have Full Responsibility For Any And All Damages To Existing Hospital Facilities, Utilities, And/or Any Portion Of The Hospital’s Common Area, Due To The Works Undertaken By Contractor, Whether Accidental Or Intentional. • No Variation Order Shall Be Undertaken Unless Verified By Hospital Engineer And Approved By Executive Committee. • Contractor Shall Not Cover Or Block Stub-outs (cleanouts, Water Source, Exhaust, Sewer, Drainage, Etc.) When Not Utilized. Said Stub-outs Shall At All Times Be Free Of Obstructions And Easily Accessible. • Contractor Shall Secure A Utility Tapping Permit Prior To Tapping From Utility Provision. • Electricity And Water Consumed During Construction Shall Be Charged To Contractor. • End-users Reserves The Right To Inspect The Works At Any Time. • Contractor Shall Insure And Hold Client, Its Affiliates, Officers, Directors, Stockholders, Employees, Agents, And/or Representatives, Free And Harmless From And Against Any Injury, Losses, Claims, Damages, Liabilities, Expenses, And/or Costs Of Litigation, Resulting From Or Arising Out Of The Works Undertaken By Contractor. • In Event Of Force Majeure, The Contractor Shall Rectify, Replace Or Build The Unfinished Projects When It Is Not Yet Completed And Accepted W/o Additional Cost For The Procuring Entity. • Contractor Shall Comply With The Construction House Rules Of This Hospital.
Closing Date11 Mar 2025
Tender AmountPHP 65 Million (USD 1.1 Million)

BARANGAY MAGRAFIL GONZAGA, CAGAYAN Tender

Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Philippines
Details: Description Preface These Philippine Bidding Documents (pbds) For The Procurement Of Infrastructure Projects (hereinafter Referred To Also As The “works”) Through Competitive Bidding Have Been Prepared By The Government Of The Philippines For Use By All Branches, Agencies, Departments, Bureaus, Offices, Or Instrumentalities Of The Government, Including Government-owned And/or -controlled Corporations, Government Financial Institutions, State Universities And Colleges, Local Government Units, And Autonomous Regional Government. The Procedures And Practices Presented In This Document Have Been Developed Through Broad Experience, And Are For Mandatory Use In Projects That Are Financed In Whole Or In Part By The Government Of The Philippines Or Any Foreign Government/foreign Or International Financing Institution In Accordance With The Provisions Of The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. The Pbds Are Intended As A Model For Admeasurements (unit Prices Or Unit Rates In A Bill Of Quantities) Types Of Contract, Which Are The Most Common In Works Contracting. The Bidding Documents Shall Clearly And Adequately Define, Among Others: (i) The Objectives, Scope, And Expected Outputs And/or Results Of The Proposed Contract; (ii) The Eligibility Requirements Of Bidders; (iii) The Expected Contract Duration; And (iv) The Obligations, Duties, And/or Functions Of The Winning Bidder. Care Should Be Taken To Check The Relevance Of The Provisions Of The Pbds Against The Requirements Of The Specific Works To Be Procured. If Duplication Of A Subject Is Inevitable In Other Sections Of The Document Prepared By The Procuring Entity, Care Must Be Exercised To Avoid Contradictions Between Clauses Dealing With The Same Matter. Moreover, Each Section Is Prepared With Notes Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Shall Not Be Included In The Final Documents. The Following General Directions Should Be Observed When Using The Documents: A. All The Documents Listed In The Table Of Contents Are Normally Required For The Procurement Of Infrastructure Projects. However, They Should Be Adapted As Necessary To The Circumstances Of The Particular Project. B. Specific Details, Such As The Continuation Of Peri- Meter Fence And “address For Bid Submission,” Should Be Furnished In The Instructions To Bidders, Bid Data Sheet, And Special Conditions Of Contract. The Final Documents Should Contain Neither Blank Spaces Nor Options. C. This Preface And The Footnotes Or Note In Italics Included In The Invitation To Bid, Bds, General Conditions Of Contract, Special Conditions Of Contract, Specifications, Drawings, And Bill Of Quantities Are Not Part Of The Text Of The Final Document, Although They Contain Instructions That The Procuring Entity Should Strictly Follow. D. The Cover Should Be Modified As Required To Identify The Bidding Documents As To The Names Of The Project, Contract, And Procuring Entity, In Addition To Date Of Issue. E. Modifications For Specific Procurement Project Details Should Be Provided In The Special Conditions Of Contract As Amendments To The Conditions Of Contract. For Easy Completion, Whenever Reference Has To Be Made To Specific Clauses In The Bid Data Sheet Or Special Conditions Of Contract, These Terms Shall Be Printed In Bold Typeface On Sections I (instructions To Bidders) And Iii (general Conditions Of Contract), Respectively. F. For Guidelines On The Use Of Bidding Forms And The Procurement Of Foreignassisted Projects, These Will Be Covered By A Separate Issuance Of The Government Procurement Policy Board. Table Of Contents Glossary Of Terms, Abbreviations, And Acronyms 5 Section I. Invitation To Bid 7 Section Ii. Instructions To Bidders 10 1. Scope Of Bid 10 2. Funding Information 10 3. Bidding Requirements 11 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices 11 5. Eligible Bidders 11 6. Origin Of Associated Goods 12 7. Subcontracts 12 8. Pre-bid Conference 13 9. Clarification And Amendment Of Bidding Documents 13 10. Documents Comprising The Bid: Eligibility And Technical Components 13 11. Documents Comprising The Bid: Financial Component 14 12. Alternative Bids 14 13. Bid Prices 14 14. Bid And Payment Currencies 14 15. Bid Security 15 16. Sealing And Marking Of Bids 15 17. Deadline For Submission Of Bids 15 18. Opening And Preliminary Examination Of Bids 15 19. Detailed Evaluation And Comparison Of Bids 16 20. Post Qualification 16 21. Signing Of The Contract 16 Section Iii. Bid Data Sheet 17 Section Iv. General Conditions Of Contract 18 1. Scope Of Contract 19 2. Sectional Completion Of Works 19 3. Possession Of Site 19 4. The Contractor’s Obligations 19 5. Performance Security 20 6. Site Investigation Reports 20 7. Warranty 20 8. Liability Of The Contractor 20 9. Termination For Other Causes 20 10. Dayworks 21 11. Program Of Work 21 12. Instructions, Inspections And Audits 21 13. Advance Payment 21 14. Progress Payments 21 15. Operating And Maintenance Manuals 22 Section V. Special Conditions Of Contract 23 Section Vi. Specifications 26 Section Vii. Drawings 28 Section Viii. Bill Of Quantities 29 Section Ix. Checklist Of Technical And Financial Documents 33   Glossary Of Terms, Abbreviations, And Acronyms Abc – Approved Budget For The Contract. Arcc – Allowable Range Of Contract Cost. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Cda – Cooperative Development Authority. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Contractor – Is A Natural Or Juridical Entity Whose Proposal Was Accepted By The Procuring Entity And To Whom The Contract To Execute The Work Was Awarded. Contractor As Used In These Bidding Documents May Likewise Refer To A Supplier, Distributor, Manufacturer, Or Consultant. Cpi – Consumer Price Index. Dole – Department Of Labor And Employment. Dti – Department Of Trade And Industry. Foreign-funded Procurement Or Foreign-assisted Project – Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Pcab – Philippine Contractors Accreditation Board. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Un – United Nations. Section I. Invitation To Bid Notes On The Invitation To Bid The Invitation To Bid (ib) Provides Information That Enables Potential Bidders To Decide Whether To Participate In The Procurement At Hand. The Ib Shall Be Posted In Accordance With Section 21.2 Of The 2016 Revised Irr Of Ra No. 9184. Apart From The Essential Items Listed In The Bidding Documents, The Ib Should Also Indicate The Following: A. The Date Of Availability Of The Bidding Documents, Which Shall Be From The Time The Ib Is First Advertised/posted Until The Deadline For The Submission And Receipt Of Bids; B. The Place Where The Bidding Documents May Be Acquired Or The Website Where It May Be Downloaded; C. The Deadline For The Submission And Receipt Of Bids; And D. Any Important Bid Evaluation Criteria. The Ib Should Be Incorporated Into The Bidding Documents. The Information Contained In The Ib Must Conform To The Bidding Documents And In Particular To The Relevant Information In The Bid Data Sheet. Republic Of The Philippines Province Of Cagayan Municipality Of Gonzaga Barangay Magrafil Invitation To Bid For The Backfilling & Concreting Of Multi-purpose Gym At Magrafil, Gonzaga, Cagayan 1. The Backfilling & Concreting Of Multi-purpose Gym At Magrafil, Gonzaga, Cagayan, Through The Funding Intends To Apply The Sum Of Three Hundred Twenty Six Thousand Two Hundred Pesos (326,200.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Magrafil -infra-001-2025. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Bid Opening. 2. The Backfilling & Concreting Of Multi-purpose Gym Magrafil, Gonzaga, Cagayan. Completion Of The Works Is Required 30 Days Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Nondiscretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information On The Backfilling & Concreting Of Multi-purpose Gym At Magrafil, Gonzaga, Cagayan. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 20, 2025 From Given Address And Website/s Below {insert If Necessary: And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Hundred Pesos. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person Or Via Email. 6. The Bac Will Hold A Pre-bid Conference On [january 28, 2025] At [lnb Hall Municipal Compound Barangay Magrafil, Gonzaga, Cagayan] {[insert If Applicable] And/or Through Videoconferencing/webcasting Via [insert Website, Application Or Technology To Be Used].}, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On January 28, 2025 At 9:14 Am At The Given Address At {lnb Hall, Municipal Compound Barangay Smart Gonzaga, Cagayan] And/or Through [insert Website, Application, Or Technology To Be Used].} Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. [insert Such Other Necessary Information Deemed Relevant By The Procuring Entity Such As The Use Of A Back-up Data Or Cloud Storage For Large Files Uploaded For Online Bid Submissions] 11. The Backfilling & Concreting Of Multi-purpose Gym Magrafil, Gonzaga, Cagayan Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Flordelisa I. Javier Secretariat Bids And Awards Committee Barangay Hall Barangay Magrafil, Gonzaga, Cagayan Email: Lisaidmilao32@gmail.com 09999779655-09065742240 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: [indicate Websites] [if Applicable] For Online Bid Submission: [indicate Website] January 16, 2025 ________________________________ Wilfrey Loy S. Idmilao Bac Chairperson Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, [barangay Magrafil, Gonzaga, Cagayan] Invites Bids For The Backfilling & Concreting Of Multi-purpose Gym Magrafil, Gonzaga, Cagayan, With Project Identification Number Magrafil-infra-001-2025. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project (referred To Herein As “project”) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 2025 In The Amount Of Three Hundred Twenty Six Thousand Two Hundred Pesos. 2.2. The Source Of Funding Is: [if An Early Procurement Activity, Select One And Delete Others:] A. Nga, The National Expenditure Program. B. Gocc And Gfis, The Proposed Corporate Operating Budget. C. Lgus, The Proposed Local Expenditure Program. [if Not An Early Procurement Activity, Select One And Delete Others:] A. Nga, The General Appropriations Act Or Special Appropriations. B. Gocc And Gfis, The Corporate Operating Budget. C. Lgus, The Annual Or Supplemental Budget, As Approved By The Sangguniang. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: [select One, Delete Other/s] A. Subcontracting Is Allowed. The Portions Of Project And The Maximum Percentage Allowed To Be Subcontracted Are Indicated In The Bds, Which Shall Not Exceed Fifty Percent (50%) Of The Contracted Works. B. Subcontracting Is Not Allowed. 7.1. [if Procuring Entity Has Determined That Subcontracting Is Allowed During The Bidding , State:] The Bidder Must Submit Together With Its Bid The Documentary Requirements Of The Subcontractor(s) Complying With The Eligibility Criterial Stated In Itb Clause 5 In Accordance With Section 23.4 Of The 2016 Revised Irr Of Ra No. 9184 Pursuant To Section 23.1 Thereof. 7.2. [if Subcontracting Is Allowed During The Contract Implementation Stage, State:] The Supplier May Identify Its Subcontractor During The Contract Implementation Stage. Subcontractors Identified During The Bidding May Be Changed During The Implementation Of This Contract. Subcontractors Must Submit The Documentary Requirements Under Section 23.1 Of The 2016 Revised Irr Of Ra No. 9184 And Comply With The Eligibility Criteria Specified In Itb Clause 5 To The Implementing Or End-user Unit. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address {[insert If Applicable] And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: [select One, Delete Other/s] A. Philippine Pesos. B. [indicate Currency If Procurement Involves A Foreign-denominated Bid As Allowed By The Procuring Entity, Which Shall Be Tradeable Or Acceptable By The Bsp.] 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until [indicate Date]. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Notes On The Bid Data Sheet (bds) The Bid Data Sheet (bds) Consists Of Provisions That Supplement, Amend, Or Specify In Detail, Information, Or Requirements Included In The Itb Found In Section Ii, Which Are Specific To Each Procurement. This Section Is Intended To Assist The Procuring Entity In Providing The Specific Information In Relation To Corresponding Clauses In The Itb And Has To Be Prepared For Each Specific Procurement. The Procuring Entity Should Specify In The Bds Information And Requirements Specific To The Circumstances Of The Procuring Entity, The Processing Of The Procurement, And The Bid Evaluation Criteria That Will Apply To The Bids. In Preparing The Bds, The Following Aspects Should Be Checked: A. Information That Specifies And Complements Provisions Of The Itb Must Be Incorporated. B. Amendments And/or Supplements, If Any, To Provisions Of The Itb As Necessitated By The Circumstances Of The Specific Procurement, Must Also Be Incorporated. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: [provide Description/clarification Of What Are Major Categories Of Work]. 7.1 [specify The Portions Of Works And The Maximum Percentage Allowed To Be Subcontracted, Which Shall Not Be Significant Or Material Components Of The Project As Determined By The Procuring Entity.] 10.3 [specify If Another Contractor License Or Permit Is Required. ] 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel General Experience Relevant Experience 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units 12 [insert Value Engineering Clause If Allowed.] 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than __________ [insert Two Percent (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less Than __________ [insert Five Percent (5%) Of Abc] If Bid Security Is In Surety Bond. 19.2 Partial Bids Are Allowed, As Follows: [insert Grouping Of Lots By Specifying The Items And The Quantity For Every Identified Lot.] 20 [list Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It, E.g. Environmental Compliance Certificate, Certification That The Project Site Is Not Within A Geohazard Zone, Etc.] 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And Scurve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And Other Acceptable Tools Of Project Scheduling. Section Iv. General Conditions Of Contract Notes On The General Conditions Of Contract The General Conditions Of Contract (gcc) In This Section, Read In Conjunction With The Special Conditions Of Contract In Section V And Other Documents Listed Therein, Should Be A Complete Document Expressing All The Rights And Obligations Of The Parties. Matters Governing Performance Of The Contractor, Payments Under The Contract, Or Matters Affecting The Risks, Rights, And Obligations Of The Parties Under The Contract Are Included In The Gcc And Special Conditions Of Contract. Any Complementary Information, Which May Be Needed, Shall Be Introduced Only Through The Special Conditions Of Contract.   1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 4.1. The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 4.2. If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor.   Section V. Special Conditions Of Contract Notes On The Special Conditions Of Contract Similar To The Bds, The Clauses In This Section Are Intended To Assist The Procuring Entity In Providing Contract-specific Information In Relation To Corresponding Clauses In The Gcc Found In Section Iv. The Special Conditions Of Contract (scc) Complement The Gcc, Specifying Contractual Requirements Linked To The Special Circumstances Of The Procuring Entity, The Procuring Entity’s Country, The Sector, And The Works Procured. In Preparing This Section, The Following Aspects Should Be Checked: A. Information That Complements Provisions Of The Gcc Must Be Incorporated. B. Amendments And/or Supplements To Provisions Of The Gcc As Necessitated By The Circumstances Of The Specific Purchase, Must Also Be Incorporated. However, No Special Condition Which Defeats Or Negates The General Intent And Purpose Of The Provisions Of The Gcc Should Be Incorporated Herein. Special Conditions Of Contract Gcc Clause 2 [if Different Dates Are Specified For Completion Of The Works By Section, I.e. “sectional Completion,” These Dates Should Be Listed Here.] 4.1 [specify The Schedule Of Delivery Of The Possession Of The Site To The Contractor, Whether Full Or In Part.] 6 The Site Investigation Reports Are: [list Here The Required Site Investigation Reports.] 7.2 [select One, Delete The Other.] [in Case Of Permanent Structures, Such As Buildings Of Types 4 And 5 As Classified Under The National Building Code Of The Philippines And Other Structures Made Of Steel, Iron, Or Concrete Which Comply With Relevant Structural Codes (e.g., Dpwh Standard Specifications), Such As, But Not Limited To, Steel/concrete Bridges, Flyovers, Aircraft Movement Areas, Ports, Dams, Tunnels, Filtration And Treatment Plants, Sewerage Systems, Power Plants, Transmission And Communication Towers, Railway System, And Other Similar Permanent Structures:] Fifteen (15) Years. [in Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures:] Five (5) Years. [in Case Of Other Structures, Such As Bailey And Wooden Bridges, Shallow Wells, Spring Developments, And Other Similar Structures:] Two (2) Years. 10 [select One, Delete The Other:] A. Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. B. No Dayworks Are Applicable To The Contract. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within [insert Number] Days Of Delivery Of The Notice Of Award. 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is Three Hundred Six Thousand Pesos. 13 The Amount Of The Advance Payment Is [insert Amount As Percentage Of The Contract Price That Shall Not Exceed 15% Of The Total Contract Price And Schedule Of Payment]. 14 [if Allowed By The Procuring Entity, State:] Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Be Included For Payment. 15.1 The Date By Which Operating And Maintenance Manuals Are Required Is [date]. The Date By Which “as Built” Drawings Are Required Is [date]. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is [amount In Local Currency]. Section Vi. Specifications Notes On Specifications A Set Of Precise And Clear Specifications Is A Prerequisite For Bidders To Respond Realistically And Competitively To The Requirements Of The Procuring Entity Without Qualifying Or Conditioning Their Bids. In The Context Of International Competitive Bidding, The Specifications Must Be Drafted To Permit The Widest Possible Competition And, At The Same Time, Present A Clear Statement Of The Required Standards Of Workmanship, Materials, And Performance Of The Goods And Services To Be Procured. Only If This Is Done Will The Objectives Of Economy, Efficiency, And Fairness In Procurement Be Realized, Responsiveness Of Bids Be Ensured, And The Subsequent Task Of Bid Evaluation Facilitated. The Specifications Should Require That All Goods And Materials To Be Incorporated In The Works Be New, Unused, Of The Most Recent Or Current Models, And Incorporate All Recent Improvements In Design And Materials Unless Provided Otherwise In The Contract. Samples Of Specifications From Previous Similar Projects Are Useful In This Respect. The Use Of Metric Units Is Mandatory. Most Specifications Are Normally Written Specially By The Procuring Entity Or Its Representative To Suit The Works At Hand. There Is No Standard Set Of Specifications For Universal Application In All Sectors In All Regions, But There Are Established Principles And Practices, Which Are Reflected In These Pbds. There Are Considerable Advantages In Standardizing General Specifications For Repetitive Works In Recognized Public Sectors, Such As Highways, Ports, Railways, Urban Housing, Irrigation, And Water Supply, In The Same Country Or Region Where Similar Conditions Prevail. The General Specifications Should Cover All Classes Of Workmanship, Materials, And Equipment Commonly Involved In Construction, Although Not Necessarily To Be Used In A Particular Works Contract. Deletions Or Addenda Should Then Adapt The General Specifications To The Particular Works. Care Must Be Taken In Drafting Specifications To Ensure That They Are Not Restrictive. In The Specification Of Standards For Goods, Materials, And Workmanship, Recognized International Standards Should Be Used As Much As Possible. Where Other Particular Standards Are Used, Whether National Standards Or Other Standards, The Specifications Should State That Goods, Materials, And Workmanship That Meet Other Authoritative Standards, And Which Ensure Substantially Equal Or Higher Quality Than The Standards Mentioned, Will Also Be Acceptable. The Following Clause May Be Inserted In The Scc. Sample Clause: Equivalency Of Standards And Codes Wherever Reference Is Made In The Contract To Specific Standards And Codes To Be Met By The Goods And Materials To Be Furnished, And Work Performed Or Tested, The Provisions Of The Latest Current Edition Or Revision Of The Relevant Standards And Codes In Effect Shall Apply, Unless Otherwise Expressly Stated In The Contract. Where Such Standards And Codes Are National, Or Relate To A Particular Country Or Region, Other Authoritative Standards That Ensure A Substantially Equal Or Higher Quality Than The Standards And Codes Specified Will Be Accepted Subject To The Procuring Entity’s Representative’s Prior Review And Written Consent. Differences Between The Standards Specified And The Proposed Alternative Standards Shall Be Fully Described In Writing By The Contractor And Submitted To The Procuring Entity’s Representative At Least Twenty-eight (28) Days Prior To The Date When The Contractor Desires The Procuring Entity’s Representative’s Consent. In The Event The Procuring Entity’s Representative Determines That Such Proposed Deviations Do Not Ensure Substantially Equal Or Higher Quality, The Contractor Shall Comply With The Standards Specified In The Documents. These Notes Are Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Should Not Be Included In The Final Bidding Documents. Section Vii. Drawings Section Viii. Bill Of Quantities Notes On The Bill Of Quantities Objectives The Objectives Of The Bill Of Quantities Are: A. To Provide Sufficient Information On The Quantities Of Works To Be Performed To Enable Bids To Be Prepared Efficiently And Accurately; And B. When A Contract Has Been Entered Into, To Provide A Priced Bill Of Quantities For Use In The Periodic Valuation Of Works Executed. In Order To Attain These Objectives, Works Should Be Itemized In The Bill Of Quantities In Sufficient Detail To Distinguish Between The Different Classes Of Works, Or Between Works Of The Same Nature Carried Out In Different Locations Or In Other Circumstances Which May Give Rise To Different Considerations Of Cost. Consistent With These Requirements, The Layout And Content Of The Bill Of Quantities Should Be As Simple And Brief As Possible. Daywork Schedule A Daywork Schedule Should Be Included Only If The Probability Of Unforeseen Work, Outside The Items Included In The Bill Of Quantities, Is High. To Facilitate Checking By The Entity Of The Realism Of Rates Quoted By The Bidders, The Daywork Schedule Should Normally Comprise The Following: A. A List Of The Various Classes Of Labor, Materials, And Constructional Plant For Which Basic Daywork Rates Or Prices Are To Be Inserted By The Bidder, Together With A Statement Of The Conditions Under Which The Contractor Will Be Paid For Work Executed On A Daywork Basis. B. Nominal Quantities For Each Item Of Daywork, To Be Priced By Each Bidder At Daywork Rates As Bid. The Rate To Be Entered By The Bidder Against Each Basic Daywork Item Should Include The Contractor’s Profit, Overheads, Supervision, And Other Charges. Provisional Sums A General Provision For Physical Contingencies (quantity Overruns) May Be Made By Including A Provisional Sum In The Summary Bill Of Quantities. Similarly, A Contingency Allowance For Possible Price Increases Should Be Provided As A Provisional Sum In The Summary Bill Of Quantities. The Inclusion Of Such Provisional Sums Often Facilitates Budgetary Approval By Avoiding The Need To Request Periodic Supplementary Approvals As The Future Need Arises. Where Such Provisional Sums Or Contingency Allowances Are Used, The Scc Should State The Manner In Which They Will Be Used, And Under Whose Authority (usually The Procuring Entity’s Representative’s). The Estimated Cost Of Specialized Work To Be Carried Out, Or Of Special Goods To Be Supplied, By Other Contractors Should Be Indicated In The Relevant Part Of The Bill Of Quantities As A Particular Provisional Sum With An Appropriate Brief Description. A Separate Procurement Procedure Is Normally Carried Out By The Procuring Entity To Select Such Specialized Contractors. To Provide An Element Of Competition Among The Bidders In Respect Of Any Facilities, Amenities, Attendance, Etc., To Be Provided By The Successful Bidder As Prime Contractor For The Use And Convenience Of The Specialist Contractors, Each Related Provisional Sum Should Be Followed By An Item In The Bill Of Quantities Inviting The Bidder To Quote A Sum For Such Amenities, Facilities, Attendance, Etc. Signature Box A Signature Box Shall Be Added At The Bottom Of Each Page Of The Bill Of Quantities Where The Authorized Representative Of The Bidder Shall Affix His Signature. Failure Of The Authorized Representative To Sign Each And Every Page Of The Bill Of Quantities Shall Be A Cause For Rejection Of His Bid. These Notes For Preparing A Bill Of Quantities Are Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Should Not Be Included In The Final Documents. Section Ix. Checklist Of Technical And Financial Documents Notes On The Checklist Of Technical And Financial Documents The Prescribed Documents In The Checklist Are Mandatory To Be Submitted In The Bid, But Shall Be Subject To The Following: A. Gppb Resolution No. 09-2020 On The Efficient Procurement Measures During A State Of Calamity Or Other Similar Issuances That Shall Allow The Use Of Alternate Documents In Lieu Of The Mandated Requirements; Or B. Any Subsequent Gppb Issuances Adjusting The Documentary Requirements After The Effectivity Of The Adoption Of The Pbds. The Bac Shall Be Checking The Submitted Documents Of Each Bidder Against This Checklist To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion Pursuant To Section 30 Of The 2016 Revised Irr Of Ra No. 9184. Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages); Or ⬜ (b) Registration Certificate From Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives Or Its Equivalent Document; And ⬜ (c) Mayor’s Or Business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas; And ⬜ (e) Tax Clearance Per E.o. No. 398, S. 2005, As Finally Reviewed And Approved By The Bureau Of Internal Revenue (bir). Technical Documents ⬜ (f) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (g) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (h) Philippine Contractors Accreditation Board (pcab) License; Or Special Pcab License In Case Of Joint Ventures; And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (i) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And (j) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (k) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (l) The Prospective Bidder’s Audited Financial Statements, Showing, Among Others, The Prospective Bidder’s Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; And ⬜ (m) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (n) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (o) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (p) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (q) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (r) Cash Flow By Quarter.
Closing Date18 Feb 2025
Tender AmountPHP 326.2 K (USD 5.6 K)
8061-8070 of 8065 archived Tenders