Fencing Tenders

Fencing Tenders

City Of Valencia Tender

Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Philippines
Details: Description Local Government Of Valencia Catarata Street, Poblacion, Valencia City, Bukidnon, Philippines Philippine Access (088) 828-5430 Contract Reference No. 48-2024 12/14/2024 Invitation To Bid For The Construction Of Canopy And Other Structures, City Health Office At Barangay Poblacion, Valencia City, Bukidnon 1. The City Government Of Valencia Through Its Annual Appropriations Intends To Apply The Sum Of Four Million Seven Hundred Seventy-three Thousand Two Hundred Four Pesos And 84/100 (php 4,773,204.84) Being The Approved Budget Of The Contract (abc) To Payments Under The Contract For The Construction Of Canopy And Other Structures, City Health Office At Barangay Poblacion, Valencia City, Bukidnon. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The City Government Of Valencia Now Invites Bids For The Construction Of Canopy And Other Structures, City Health Office At Barangay Poblacion, Valencia City, Bukidnon. Particulars Describes As Follows: Item No. Qty Unit Description Specifications Unit Cost Total Cost 1 1 Lot Construction Of Canopy And Other Structures, City Health Office Php4,773,204.84 ● Construction Of Walkway Canopy ● Renovation Of Porte Cochery Roof ● Construction Of Waiting Area With Drinking Fountain And Handwashing Area ● Fabrication And Installation Of Mrf ● Construction Of Perimeter Fence ● Removal And Replacement Of Tb Dots Polycarbonate Roof Sheets ● Removal And Replacement Of Concrete Pavement Leading To Tb Dots ● Construction Of Parking Area And Outdoor Kitchen Scope Of Works: A.) Application Of Permits And Clearances, B.) Fabrication And Installation Of Project Billboard And Signboard, C.) Occupational Safety And Health Program, D.) Project Mobilization And Demobilization, G.) Demolition Of Kitchen, Pavement To Tb Dots And Porte Cochery Roof; Structure Excavation For Concrete Structures Such As Footings And Wall Footingh.) Gravel Fill For Footings, Wall Footing And Floors, I.) Construction Of Reinforced Concrete Structures Such As Footing, Pedestals, Wall Footing, Lavatory, Canal And Floors, J.) Fabrication And Installation Of Formworks And Falseworks, K.) Embankment From Structure Excavation, L.) Fabrication And Installation Of Steel Structures Roof Framings Such As Rafter, Girt, Anchor Bolt, Baseplate, Fascia Frame, Purlins, M.) Installation Of Pre-painted Metal Sheets And Fabricated Metal Accessories Such As Flashings And Gutter, Polycarbonate Roof, Acp, Pvc Ceiling, O.) Installation Of Metal Frames And Fiber Board On Fascia Board (fiber Cement Board), P.) Painting Works On All Steel And Concrete Structures, Q.)installation Of Plumbing Fixtures, Gratings, Barb Wire, Plumbing Works (including Handwashing Sink And Drinking Fountain), Storm Drainage And Downspout, R.) Installation Of Electrical Works, S.) Purchase & Installation Of Industrial Fan, Complete As Per Approved Pow, Plans, And Specifications. Part I General Requirements B.3 (1) 1.00 L.s. Permits And Clearances B.5 (1) 1.00 Ea. Project Billboard / Signboard B.7 (1) 1.00 L.s. Occupational Safety And Health Program B.9 (1) 1.00 L.s. Mobilization / Demobilization Part Ii Civil, Mechanical, Electrical And Sanitary/plumbing Works See Attached Plan And Specifications Part A Earthwork 801 (1) 1.00 L.s. Removal Of Structures And Obstruction 803 (1) A 168.74 Cu.m. Structure Excavation (common Soil) 804 (1) A 53.44 Cu.m. Embankment From Structure Excavation(common Soil) 804 (7) 31.66 Cu.m. Gravel Fill Part B Plain And Reinforced Concrete Work 900 (1) C 49.17 Cu.m. Structural Concrete (3000psi, Class A, 28 Days) 902 (1) A1 3,212.35 Kg. Reinforcing Steel (deformed, Grade 40) 903 (2) 101.12 Sq.m. Formworks And Falseworks Part C Finishings And Other Civil Works C.2 Masonry Works 1046 (2) A1 209.24 Sq.m. Chb Non Load Bearing (including Reinforcing Steel, 100mm) C.3 Fabricated Materials 1007 (1) B 5.25 Sq.m. Aluminum Framed Glass Door (swing Type) 1008 (1) A 44.52 Sq.m. Aluminum Glass Windows (sliding Type) 1008 (1) C 10.40 Sq.m. Aluminum Glass Windows (awning Type) 1008 (1) D 5.19 Sq.m. Aluminum Glass Windows (fixed Type) C.4 Finishing Works 1003(1)a1 147.40 Sq.m. Ceiling (6mm Marine Plywood On Metal Frame) 1003(1)a2 17.98 Sq.m. Ceiling (pvc Panel Board On Metal Frame) 1003(2)1 1.00 L.s. Parapet Wall (aluminum Composite Panel On Aluminum Frame) 1003 (11) A1 39.90 M. Fascia Board (fiber Cement Board) 1018 (1) 172.91 Sq.m. Glazed Tiles And Trims 1027 (1) 316.44 Sq.m. Cement Plaster Finish C.5 Painting Works 1032 (1) A 525.04 Sq.m. Painting Works (masonry) 1032 (1) C 572.85 Sq.m. Painting Works (steel) C.6 Roof Framing And Roofing Works 1013 (2) A2 50.10 L.m. Fabricated Metal Roofing Accessory (gauge 26) - Flashings 1013 (2) B1 25.00 L.m. Fabricated Metal Roofing Accessory (gauge 24) - Gutters 1014 (1) B2 548.64 Sq.m. Prepainted Metal Sheets (rib Type, Long Span, Above 0.427 Mm) See Attached Plan And Specifications 1036(1) A 70.56 Sq.m. Polycarbonate (sheets) 1047 (1) 6,302.64 Kgs Structural Steel 1047 (2) B 2,348.63 Kg. Structural Steel (purlins) 1047 (3) C 28.00 Ea. Metal Structure Accessories (turnbuckle) - 12mm Ø 1047 (4) 157.35 Kg. Metal Structure Accessories (cross Bracing) 1047 (6) 356.77 Kg. Metal Structure Accessories (steel Plates) 1047 (7) A 96.36 Kg. Metal Structure Accessories (bolts) 1047 (7) B 16.19 Kg. Metal Structure Accessories (sagrods) - 10mmø 503(1) 17.00 Sets Metal Frames And Grating C.7 Plumbing Works 1001 (5) B 4.00 Ea. Catch Basin (chb) 1001 (8) 1.00 L.s. Sewer Line Works 1002 (4) 1.00 L.s. Plumbing Fixtures (including Drinking Fountain And Handwashing Area) 1002 (24) 1.00 L.s. Cold Water Lines Part D Electrical Works 1100 1.00 L.s Conduits, Boxes And Fittings (conduit Works/conduit Rough-in) 1200 (3) 1.00 L.s Stand Fan, Industrial Type 1101 (33) 1.00 L.s. Wires And Wiring Devices 1102 (1) 1.00 L.s. Panelboard With Main & Branch Breakers 1103 (1) 1.00 L.s. Lighting Fixture And Lamps Php4,773,204.84 Required Number Of Days For Completion Is 195 Calendar Days. Bidders Should Have Completed A Contract Similar To The Project Within 10 Years From The Date Of Submission And Receipt Of The Bid Hereof. The Description Of An "eligible Bidder" Is Contained In The Bidding Documents, Particularly In Section Ii. Instructions To Bidders. 3. No Time Extension Shall Be Granted Unless On Fortuitous Event, Acts Of Nature Or Any Natural Calamities. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary "pass/fail" Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act". Bidding Is Restricted To Filipino Citizens, Sole Proprietorship, Partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. 5. Interested Bidders May Obtain Further Information From Josafat L. Caipang, Head Of Lgu-valencia City Bac Secretariat And Inspect The Bidding Documents At Address Given Below From Mondays-fridays 8:00 Am To 5:00 Pm. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders On December 15, 2024 To Opening Date From The Address Below And Upon Payment Of Non-refundable Fee For The Bidding Documents In The Amount Five Thousand Pesos (php 5,000.00). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) Provided That The Bidders Shall Pay The Non-refundable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. Site Inspection Is Required From Every Interested Bidder And Site Inspection Certificate Shall Form Part Of The Bid Documents. No Site Inspection Certificate Shall Mean Automatic Disqualification. Site Inspection Schedule Is On December 20, 2024 At 10:00 O’clock In The Morning, Assembly Area At Bac Office. 6. The City Government Of Valencia Will Hold Its Pre-bid Conference On December 23, 2024 (1:30 Pm) At The Bac Office, City Hall Compound, City Of Valencia, Bukidnon Which Shall Be Open To All Interested Bidders. 7. Only Project Engineers, Materials Engineer And The Like Are Required To Attend The Pre-bid Conference. In The Absence Of The Same, The Representative Must Present To The Bac An Authorization Letter Signed By The Owner. 8. Interested Contractor Are Required To Include In Their Technical Bid Proposal The Duly Signed List Of Contractor's Equipment Units, Which Are Owned, Leased And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project. 9. Prospective Bidders Who Were Not Able To Purchase Bid Documents Prior To The Bid Opening Shall Not Be Opened And Will Be Disqualified. 10. Bids Must Be Delivered To The Address Below On Or Before (1:00 Pm) January 6, 2025. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms In The Amount Stated In Itb Clause 18. Bids Will Be Opened In The Presence Of The Bidders’ Representative Who Chooses To Attend At The Address Below. Bid Opening Shall Be On (1:30 Pm) January 6, 2025 At Bac Office, City Hall Compound, City Of Valencia, Bukidnon. Late Bids Shall Not Be Accepted. The Clock In The Bac Office Shall Serve As The Time Reference, And Shall Be The Basis For The Official Time Received Of The Bidding Documents Submitted In The Office. 11. The City Government Of Valencia Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expenses Incurred In The Preparation Of The Bid. 12. The Head Of The Procuring Entity (hope) Reserves The Right To Accept Or Reject Any Or All Bids To Annul The Bidding Process, At Any Time Prior To Contract Award Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 13. All Correspondence Shall Be Addressed To The Bac Secretariat, Attention: Mr. Abe P. Gillaco, Mpa, Bac Chairman. 14. For Further Information, Please Refer To: Lgu Valencia City-josafat L. Caipang Admin Office, 8709 Catarata St., Poblacion, Valencia City, Bukidnon Tel. No. (088) 828-5430 Abe P. Gillaco, Mpa Bac Chairman
Closing Date6 Jan 2025
Tender AmountPHP 4.7 Million (USD 82.2 K)

City Of Bayawan Tender

Civil And Construction...+1Construction Material
Philippines
Details: Description "republic Of The Philippines Province Of Negros Oriental City Of Bayawan" Bids And Awards Committee Bid No.: Itb-25-028 Date.: 23.jan.2025 Invitation To Bid Sealed Bids For Quotation Of Prices Will Be Recieved For The Purchase Of The Following Supplies, Materials And Equipment Of The Government To Be Opened On The Date, Place, And Time Stated In Instruction To Bidders. Item No. Qty Unit Articles Brand "unit Price" Total Lot No. I Aggregates 1 30 Cu.m. Sand, Washed Mixing/screened 2 30 Cu.m. Gravel, Mixing Crushed Screened & Washed Max. Size: 25mm Dia 3 20 Cu.m. Boulders, (150mm Dia - 200mm Dia) Lot No. Ii Commercial Lumber 4 30 Piece Lumber, 50mm X 100mm X 4.2m 5 40 Piece Commercial Lumber, 50mm X 150mm X 4.2m 6 50 Piece Commercial Lumber, G-melina, Mahogany And Equivalent, 50mm X 50mm X 3.0m Lot No. Iii Carpentry Tools And Supplies 7 2 Box Blind Rivets, 4.5mm Dia X 19mm (1000pcs/bx) 8 13 Pack Tex Screw, # 12 X 50mm (100pcs/pk) 9 750 Kilo Tie Wire, # 16 10 90 Kilo Tie Wire, #18 11 5 Sheet Plywood, Marine, 18mm X 1.2m X 2.4m, Type I, Grade A/a 12 10 Sheet Plywood, Marine 12mm X 1.2m X 2.4m 13 20 Piece Plywood , Marine ,1/4 " 14 5 Box "nails, Common Wire, 100mm (4"") (25kgs/box)" 15 5 Box Nails, Common Wire 75mm (25kgs/bx) 16 50 Piece Nails, Umbrella/roofing 62mm(2-1/2") 17 15 Can Sealant, Elastomeric/roof (1 Liter/can) 18 10 Set Door Knob, Chrome Polished 19 50 Piece Sand Paper, #120, 225mm X 275mm 20 50 Piece Sand Paper, #1000, 225mm X 275mm 21 20 Piece Sand Paper, #180, 225mm X 275mm Lot No. Iv Cement And Additives 22 260 Bag Cement, Portland (40kgs/bag), Type 1 Lot No. V Electrical Supplies And Materials 23 10 Roll Electrical Tape, 3/4" X 18m 24 20 Piece Ceiling Receptacle, No. 4"; With Screw 25 1 Roll Flexible Hose/pipe, Pvc Electrical 1/2" Dia(150m/roll) 26 1 Roll Flexible Hose/pipe, Pvc Electrical 3/4" Dia (150m/roll) 27 20 Piece Led Bulb, 25w 28 10 Piece Switch, Surface Type, Light, One Gang 29 5 Piece Utility Box, 50mm X 100mm (2" X 4") Pvc Poly Surface Type 30 5 Set Junction Box, 100mm X 100mm W/ Cover & Screw Octagonal Lot No. Vi Fence And Restraints 31 2 Roll Sack Cloth, 3.0m Width (100m/roll) 32 8 Roll Cyclone Wire, 1.2mm X 10m (roll) 50mm X 50mm Eye 3.10mm 33 20 Kilo Gabion Wire, 2.2mm Dia Zinc Coated 34 10 Set Gabion Box, Heavy Galvanized, Cage Size: 2m X 1m X 1m, Gabion Wire: 2.2mm Ø, Body Wire: 2.7mm, Selvedge Wire: 3.4mm Wire 35 10 Roll Barbed Wire, 150m/roll (30kgs/roll) 36 20 Kilo Nylon, # 100 Lot No. Vii Paints, Tools And Supplies 37 15 Gallon Concrete Neutralizer (gal), 38 45 Gallon Latex Paint, Gloss White (gal)) 39 50 Gallon Latex Paint, Flat White 40 18 Gallon Latex Paint (gal), Flat Brown 41 5 Gallon Latex Paint (gal), Sunshine Yellow 42 50 Gallon Paint Primer, Metal Red Oxide (gal) 43 20 Can Paint Thinner, 3.75 Liter/can 44 2 Gallon Enamel Paint, Flatwall, Black (gal) 45 25 Gallon Enamel Paint, Flatwall, White 46 30 Gallon Enamel Paint, Quick Dry White (gal) 47 25 Gallon Enamel Paint, Quick Dry (gal) Brown 48 45 Gallon Reducer/thinner, Epoxy Paint (gal) 49 30 Piece Paint Roller W/ Handle, 175mm 50 30 Piece Paint Roller With Handle, 100mm 51 20 Piece Paint Tray, Plastic 52 3 Gallon Adcoat Rust Converter And Primer, Adcoat Rust Converter And Primer 53 20 Piece Paint Brush, 100mm (4"), Hair Type 54 20 Piece Paint Brush, 50mm (2") Hair Type 55 20 Piece Paint Brush, 3", Pure White Bristle 56 8 Gallon Spot Putty (gal), 57 8 Gallon Body Filler W/ Hardener (gal), 58 5 Liter Enamel Paint (lit), Black 59 5 Liter Enamel Paint (lit), Red 60 5 Liter Enamel Paint (lit), Blue 61 5 Liter Enamel Paint (lit), Yellow 62 5 Liter Enamel Paint (lit), Green Lot No. Viii Plumbing Supplies 63 1 Roll Hdpe Pipe, Outside Dia: 32mm Ø,sdr 11, Iso (100m/roll) 64 1 Roll Hdpe Hose Pipe, 50mm (60m/roll)) 65 1 Roll Hdpe Hose Pipe, 40mm Outside Dia (60m/roll) 66 5 Length Gi Pipe, (1/2") 13mm Dia X 6mm T-2.8mm Heavy Gauge 67 5 Length Gi Pipe, 32mm Dia X 6m Sched 40 Wt=3.60mm Outside Dia= 42.20 3.427kg/m Heavy Gauge) 68 5 Length Gi Pipe, 25 Mm Dia X 6m, Sched 40 69 3 Length Gi Pipe, 50mm Dia X 6m (t=2.6mm) Sched. 40 Ls2 Lite Gauge 70 3 Length Gi Pipe, 63mm Dia X 6m Sched. 40 T=3.2mm Light Gauge 71 5 Piece G.i. Tee, 50mm Dia, Sched. 40, Good Quality 72 5 Length Gi Pipe, 100mm Dia X 6m Sched 40 Wt=4.0mm Outside Dia= 114.3 10.880kg/m Light Gauge 73 5 Piece Gi Union, 50mm Dia Sched. 40 74 10 Piece Elbow, G.i., 50mm Dia X 90 Deg. Bend, Sched. 40, Good Quality 75 5 Piece End Cap, G.i., Threaded, Female, 50mm Dia Nom. Size, Sched. 40 76 5 Piece Pvc Elbow, 82.55mm Inside Dia X 90 Deg Bend Orange Lot No. Ix Steelwork Supplies And Devices 77 20 Length Deformed Steel Bar, 16mm Ø X 6m, Grade 40 78 20 Length Deformed Steel Bar, 12mm X 6m, Grade 275 79 50 Length Deformed Steel Bar, 10mm Dia X 6m, Grade 275 80 50 Length Deformed Steel Bar, 8mm Dia X 6m 2.2kgs. 81 50 Length Square Bar, 12mm X 6m 82 50 Length Square Bar, 10mm X 6m 83 20 Box Welding Rod/electrode, 3mm(1/8") Dia E6013 (2kg/bx) 84 5 Length Round Bar, Plain 12mm X 6.0m 85 5 Length Round Bar, Plain 10mm X 6.0m 86 60 Piece Blade, Hacksaw, 12mm X 300mm, 18tpi, (excellent Quality) 87 40 Piece Blade, Hacksaw, 21 Tpi 88 30 Length Gi Rectangular Tube, Thk=1.5mm 25mm X 50mm X 6m 89 18 Length Gi Rectangular Tube, Thk=2.5mm X 50mm X 50mm X 6m 90 2 Sheet Steel Plate, 4.5mm X 1.2mx 2.4m 91 2 Box Welding Rod/electrode, 3.2mm E7018(20kgs/bx) 92 1 Piece Welding Rod/electrode, Ferro-nickel Cast Iron, 3.2 Mm (1 Kg) 93 70 Length Gi Square Tube, Thk=2.0mm X 25mm X 25mm X 6m 94 26 Sheet Corrugated Sheet, G.i. 0.27mm X 3.60m 95 22 Piece Gutter, Spanish 0.40mm X 0.305mm X 2.44m Pre-painted Color: Beige 96 30 Length C-purlins, 2mm X 10mm X 100mm X 6.0m 97 10 Sheet Gi Plain Sheet, 0.40mm X 0.9m X 2.4m 98 26 Sheet Corrugated Sheet, G.i. 0.27mm X 3.0m) 99 100 Piece Cutting Disc, 100mm Dia, For Metal *** Nothing Follows *** Grand Total: Place Of Delivery: Fob Bayawan, City Warehouse Form And Amount Of Bid Security I Hereby Certify That The Above Articles Are Equally Carried In Stock By Me In Quantities Above Sstated Except Those Marked "none". Terms And Conditions Specified In The Annex Of This Are Herein Accepted. The Quantity Shown And Prices As Quoted Are Hereby Offered. Name Of Business/company Address/contact Number Signature Over Printed Name Evaluation: Bids And Awards Committee Virginia D. Sadiasa, Chairman Corazon P. Lirazan, Member Saturnino T. Dayanan, Vice Chairman Nefredo Camilo A. Villarubia, Member Wilfredo C. Tuale, Member Ernest N. Dinoipol, Member
Closing Date13 Feb 2025
Tender AmountPHP 1.1 Million (USD 19.6 K)

Municipality of Trebichovice Tender

Civil And Construction...+1Civil Works Others
Czech Republic
Details: So 100 Roads and Paved Areas The Construction of the New Sidewalk Will Follow the Route of the Existing Road Ditches and Respect the Direction of the Existing Road Ii/118. At the Beginning of the Sidewalk, a Staircase Made of Concrete Edgings Is Designed to Equalize the Height Difference and Connect to the Existing Pedestrian Routes in Front of Building No. 153. The Total Length of the Sidewalk Route Is 157.75 M. The Sidewalk Is Designed with a Minimum Width of 1.5 MV Along the Entire Length of the Route. The Basic Transverse Slope Is Designed with a Value of 2%. At the Interface of the Existing Road and the Newly Proposed Sidewalk, a Edging of Dimensions 150/250 Mm Will Be Installed into a Concrete Bed with a Support. To separate the sidewalk from the green areas, a curb measuring 80/250 mm with a 6 cm step from the sidewalk level will be used. To separate the roadway and the paved entrance area, a concrete curb measuring 150/150 mm with a 2–5 cm step is proposed. The existing ditch along the sidewalk route will be filled in. The ditch will end with a mountain drain, which will be connected to the slope by a connection under the road. At approximately the 0.082 km mark of the sidewalk, a street drain is proposed, which will similarly be connected to the slope on the opposite side of the road by a connection under the road. The outlet of the connections will be concreted. So 400 Public Lighting A total of 3 poles are designed with a spacing of 32.6 - 72.6 m. The connection of the new system will be solved by a new fuse box located on the pole at the object No. 153. The new cable line Vo in a length of approximately 100 m will be laid in an excavation trench, which will be led along the proposed border at the interface of the sidewalk and the green. Terrain Adjustments After the implementation of the sidewalk and Vo, the surrounding terrain will be leveled to the existing fencing of private land. After the terrain is leveled, a humus layer will be added and the areas will be sown with grass seed. The subject of the work is also to ensure Dio. The Subject of the Work Does Not Include Moving the Entrance Gate to a New Position and Moving the Fence to the Cadastral Border (to be Provided by the Owner of the Fence Before Commencement of the Work).
Closing Date17 Feb 2025
Tender AmountCZK 1.6 Million (USD 66.8 K)

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION USA Tender

Others
Corrigendum : Closing Date Modified
United States
Details: ********************* the Closing Date Has Been Extended Until 12:00pm On Wednesday, February 19th, 2025 Since The Original Closing Date Is A Federal Holiday. ******************** combined Synopsis/solicitation non-personal Landscape Services For Weather Forecast Office (wfo) In Charleston, Sc the Incumbent Is Yellowstone Landscape – Southeast, Llc (i) This Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With The Format In Far Subpart 12.6, As Supplemented With Additional Information Included In This Notice And In Accordance With The Simplified Acquisition Procedures Authorized In Far Part 13. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued. (ii) This Solicitation Is Issued As A Request For Quotation (rfq). Submit Written Quotes On Rfq Number 1305m325q0064. (iii) The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2025-03 (jan 2025). (iv) This Solicitation Is Being Issued As A Total Small Business Set-aside. The Associated Naics Code Is 561730. The Small Business Size Standard Is $9.5 Million. (v) This Combined Solicitation/synopsis Is For Purchase Of The Following Commercial Services: clin 0001 – Base Year services, Non-personal, To Provide All Labor, Equipment And Materials (unless Otherwise Provided Herein) Necessary For Landscape Services At The National Weather Service (nws) Weather Forecast Office (wfo) In Charleston, Sc, In Accordance With The Statement Of Work. Period Of Performance 03/01/2025 Through 02/28/2026. quantity: 12 Months Unit Price (per Month): _________ Annual Total: _____________ clin 1001 – Option Year 1 services, Non-personal, To Provide All Labor, Equipment And Materials (unless Otherwise Provided Herein) Necessary For Landscape Services At The National Weather Service (nws) Weather Forecast Office (wfo) In Charleston, Sc, In Accordance With The Statement Of Work. Period Of Performance 03/01/2026 Through 02/28/2027. quantity: 12 Months Unit Price (per Month): _________ Annual Total: _____________ clin 2001 – Option Year 2 services, Non-personal, To Provide All Labor, Equipment And Materials (unless Otherwise Provided Herein) Necessary For Landscape Services At The National Weather Service (nws) Weather Forecast Office (wfo) In Charleston, Sc, In Accordance With The Statement Of Work. Period Of Performance 03/01/2027 Through 02/28/2028. quantity: 12 Months Unit Price (per Month): _________ Annual Total: _____________ clin 3001 – Option Year 3 services, Non-personal, To Provide All Labor, Equipment And Materials (unless Otherwise Provided Herein) Necessary For Landscape Services At The National Weather Service (nws) Weather Forecast Office (wfo) In Charleston, Sc, In Accordance With The Statement Of Work. Period Of Performance 03/01/2028 Through 02/28/2029. quantity: 12 Months Unit Price (per Month): _________ Annual Total: _____________ clin 4001 – Option Year 4 services, Non-personal, To Provide All Labor, Equipment And Materials (unless Otherwise Provided Herein) Necessary For Landscape Services At The National Weather Service (nws) Weather Forecast Office (wfo) In Charleston, Sc, In Accordance With The Statement Of Work. Period Of Performance 03/01/2029 Through 02/28/2030. quantity: 12 Months Unit Price (per Month): _________ Annual Total: _____________ aggregate Total For All Years: ____________________________ (vi) Description Of Requirements Is As Follows: see Attached Statement Of Work Which Applies To Base Year And All Option Years 1 – 4, And Department Of Labor Wage Rates: Wd 2015-4281, Revision No. 32, Dated 12/23/2024, Which Can Be Found On: Https://sam.gov/content/wage-determinations invoices To Be Billed Monthly In Arrears. Provide Monthly And Annual Pricing For Each Base And Option Year. Quote Pricing May Be Provided On Attached Sf18 Form Or On Company Letterhead. (vii) Date(s) And Place(s) Of Delivery And Acceptance: period Of Performance Shall Be: base Year For A Twelve Month Period 03/01/2025 Through 2/28/2026. option Period 1 For A Twelve Month Period 03/01/2026 Through 02/28/2027. option Period 2 For A Twelve Month Period 03/01/2027 Through 02/28/2028. option Period 3 For A Twelve Month Period 03/01/2028 Through 02/28/2029. option Period 4 For A Twelve Month Period 03/01/2029 Through 02/28/2030. place Of Performance Is Nws Wfo, 5777 South Aviation Avenue, Charleston, Sc 29406-6162. (viii)far Provision 52.212-1, Instructions Toofferors-commercial Productsandcommercial Services (sept 2023), Applies To Thisacquisitionand Can Be Found On The Request For Quote Form Sf18 Attachment. (ix)far Provision 52.212-2, Evaluation-commercial Productsandcommercial Services (nov 2021), Applies To This Acquisition And Can Be Found On The Request For Quote Form Sf18 Attachment. (x)far Provision 52.212-3,offerorrepresentations And Certifications-commercial Productsandcommercial Services (may 2024), Applies To This Acquisition And Can Be Found On The Request For Quote Form Sf18 Attachment. Offerors Are Advisedto Include A Completed Copy Of The Provision With Itsoffer. (xi)far Clause At52.212-4, Contract Terms And Conditions-commercial Productsandcommercial Services (nov 2023), Applies To Thisacquisitionand Can Be Found On The Request For Quote Form Sf18 Attachment. (xii)far Clause At52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders-commercial Productsandcommercial Services (jan 2025), Applies To Thisacquisitionand Can Be Found In Full Text On The Request For Quote Form Sf18 Attachment. (xiii)any Additional Contract Requirement(s) Or Terms And Conditions That Apply Can Be Found On The Request For Quote Form Sf18 Attachment. (xiv) Defense Priorities And Allocations System (dpas) And Assigned Rating Does Not Apply. (xv) Quotes Are Required To Be Received In The Contracting Office No Later Than 12:00pm Mst/mdt On Monday, February 17, 2025. All Quotes Must Be Submitted Electronically Via Email To Kirsten.keen@noaa.gov. (xvi) Any Questions Regarding This Solicitation Should Be Submitted Electronically Via Email To Kirsten.keen@noaa.gov. utilization Of Fedconnect® For Contract Administration the Department Of Commerce Will Utilize The Fedconnect® Web Portal In Administering This Award. The Contractor Must Be Registered In Fedconnect® And Have Access To The Fedconnect® Website Located At Https://www.fedconnect.net/fedconnect/. For Assistance In Registering Or For Other Fedconnect® Questions Please Call The Fedconnect® Help Desk At (800) 899-6665 Or Email At Support@fedconnect.net. There Is No Charge For Registration In Or Use Of Fedconnect®. (end) 1352.215-72 Inquiries (apr 2010) offerors Must Submit All Questions Concerning This Solicitation In Writing Via Email To Kirsten.keen@noaa.gov. Questions Should Be Received No Later Than 12:00pm Mst/mdt On Thursday, February 13, 2025. Any Responses To Questions Will Be Made In Writing, Without Identification Of The Questioner, And Will Be Included In An Amendment To The Solicitation. Even If Provided In Other Form, Only The Question Responses Included In The Amendment To The Solicitation Will Govern Performance Of The Contract. (end Of Clause) 52.237-1 Site Visit (apr 1984) offerors Or Quoters Are Urged And Expected To Inspect The Site Where Services Are To Be Performed And To Satisfy Themselves Regarding All General And Local Conditions That May Affect The Cost Of Contract Performance, To The Extent That The Information Is Reasonably Obtainable. In No Event Shall Failure To Inspect The Site Constitute Grounds For A Claim After Contract Award. (end Of Provision) a Site Visit Is Highly Recommended But Not Required. Offerors Are Urged And Expected To Inspect The Site Where Services Are To Be Performed And To Satisfy Themselves Regarding All General And Local Conditions That May Affect The Cost Of Contract Performance, To The Extent That The Information Is Reasonably Obtainable. In No Event Shall Failure To Inspect The Site Constitute Grounds For A Claim After Contract Award. Please Contact Brian Haines, Brian.haines@noaa.gov, Phone: 771-215-9296 Or Arthur Patrick, Arthur.patrick@noaa.gov, Phone: 703-966-2529 To Set Up A Time To Visit The Site. All Questions During The Site Visit Should Be Submitted Electronically To Kirsten.keen@noaa.gov. far 52.212-1 Instructions To Offerors-commercial Products And Commercial Services (sep 2023) notice To Offerors: Instructions For Submitting Quotations Under This Request For Quote Must Be Followed. Failure To Provide All Information To Aid In The Evaluation May Be Considered Non-responsive. Offers That Are Non-responsive May Be Excluded From Further Evaluation And Rejected Without Further Notification To The Offeror. 1. Submit Pdf Or Microsoft Word Format Quotations To The Office Specified In This Solicitation At Or Before The Time Specified In The Solicitation.quote Documents Shall Include Signed Copies Of The Sf 18 And Sf 30(s) To Acknowledge The Solicitation And Any Applicable Amendments. Email Quotes Are Required And Can Be Sent To Kirsten.keen@noaa.gov. 2. Offeror Shall Have An Active Registration In The System For Award Management (sam Found At Https://sam.gov/content/home) In Order To Provide A Quote And Be Eligible For Award. Must Provide Their Ueid/cage Code With Their Quote. 3. Offerors Shall Assume That The Government Has No Prior Knowledge Of Them Or Their Capability. 4. Offerors Must Provide All Evaluation Criteria In Accordance With Far 52.212-2. Offerors Who Do Not Provide All Evaluation Criteria May Not Be Considered. 1. Technical Acceptability/capability. 2. Price the Government Does Not Accept Responsibility For Non-receipt Of Quotes. It Is The Contractor’s Responsibility To Request And Receive A Confirmation Of The Quote Receipt. far 52.212-2 Evaluation- Commercial Products And Commercial Services (nov 2021) offers Will Be Evaluated Based On Price And The Factors Set Forth In Paragraph (a). (a) The Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. Paragraph (a) Is Hereby Completed As Follows: Evaluation Will Be Based On The Following; technical Acceptability/capability. quote Shall Include At Least Two References From At Least Two Separate Contracts For Similar And Relevant Recent Services Within The Past Two Years Including The Name, Phone Number, Full Address, And E-mail Address Of The Reference To Demonstrate The Offeror’s Capability To Successfully Perform The Services Listed In The Statement Of Work. the Offeror Is Required To Fill Out Blocks 1-4 And Send The Attached Past Performance Questionnaire To The References Provided By The Offeror In Their Submission, And Email The Completed Survey Form Directly To (cs/co Email) By The Closing Date And Time Of This Solicitation. The Government Reserves The Right To Consider Past Performance Report Forms Received After The Due Date And Time Of The Solicitation, Past Performance Questionnaires Submitted From Previous Solicitations, And To Contact References For Verification Or Additional Information. the Offeror's Past Performance On Related Contracts Will Be Evaluated To Determine, As Appropriate, Successful Performance Of Contract Requirements, Quality And Timeliness Of Delivery Of Goods And Services, Cost Management, Communications Between Contracting Parties, Proactive Management And Customer Satisfaction. The Government Will Use Its Discretion To Determine The Sources Of Past Performance Information Used In The Evaluation, And The Information May Be Obtained From References Provided By The Offeror, The Agency’s Knowledge Of Offeror Performance, Other Government Agencies Or Commercial Entities, Or Past Performance Databases, And Will Be Based On Responsiveness, Quality, And Customer Services. offerors Lacking Relevant Past Performance History, Or For Whom Past Performance Information Is Either Not Available Or Has Not Been Submitted To The Government, Will Receive A Neutral Rating For Past Performance. A Good Past Performance Rating Provides Higher Confidence Than A Neutral Or Satisfactory Rating. price. the Government Intends To Award A Low Priced, Technically Acceptable, Single Firm Fixed-price Purchase Order On An All Or None Basis With Payment Terms Of Net 30. (b) Options. The Government Will Evaluate Offers For Award Purposes By Adding The Total Price For All Options To The Total Price For The Basic Requirement. The Government May Determine That An Offer Is Unacceptable If The Option Prices Are Significantly Unbalanced. Evaluation Of Options Shall Not Obligate The Government To Exercise The Option(s). (c) A Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offer’s Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award. (end Of Provision) statement Of Work performance Based Service Contract—landscape Maintenance this Is A Work Statement For A Performance-based Service. This Means That The Government Has Described What Is To Be Accomplished, Not How To Accomplish It, And States A Basis For Determining Whether Finished Work Meets The Government Quality Requirements. It Does Not State Detailed Procedures For Accomplishing The Requirement Unless There Are Safety, Security Or Communication Requirements. it Is The Responsibility Of The Contractor To Ensure That They Build Into Their Bid/proposal Price The Necessary Hours That It Will Take To Meet The Performance Standards Specified. the Contractor Will Be Required To Maintain A Quality Control Program To Ensure That The Requirements Of This Contract Are Met. This Program Shall Be Created For Identifying And Correcting Deficiencies In The Quality Of Services Before Performance Becomes Unacceptable. scope Of Work place Of Performance Will Be As Follows: National Weather Service Forecast Office, 5777 S. Aviation Ave, Charleston, Sc. 29406. The Project Site Consists Of Approximately 5 Acres, Parts Of Which Are Occupied By Buildings, Walks, And Other Paved Surfaces. all Work Performed Under This Contract Is Required To Meet The Quality And Performance Standards As Identified. The Contractor Shall Provide All Personnel, Equipment, Tools, Materials, Supervision, And Other Items And Services Necessary To Perform Landscape Maintenance On A Weekly Basis From March 1 Through October 31 And Once A Month (or More Often If Needed) From November 1 Through February 28. Work Shall Be In A Manner That Will Maintain Healthy Grass, Shrubs, And Plants, And Present A Neat And Professional Appearance. if Services Cannot Be Performed Due To Inclement Weather, The Contractor Shall Perform Any And All Scheduled Services The Next Duty Day With No Degradation To Existing Scheduled Services. supplies, Materials, Equipment And Utilities government Furnished: electrical Power Shall Be Provided At Existing Exterior Receptacles For The Contractor To Operate Their Equipment, As Necessary, In The Performance Of This Contract. contractor Furnished: the Contractor Shall Furnish All Supplies, Materials, And Employee Training Necessary To Achieve The Quality Performance Standards Of The Work In This Contract, Unless Otherwise Specified Herein. training Shall Include All Applicable Osha And Other Related Standards. The Contractor Shall Submit All Material Safety Data Sheets (msds) For Any Materials Used Under This Contract Containing “dangerous” Or “warning” Labels To The Technical Point Of Contact (tpoc) Within 10 Days After Contract Award Date. the Contractor Shall Furnish All Equipment Necessary To Accomplish The Work Under This Contract. All Equipment Must Meet All Applicable Osha Standards. The Contractor Shall Not Use Any Unsafe Equipment Or Any Equipment In Need Of Repair. .3. Contractor Personnel within Five Days Of The Contract Start Date, The Contractor Shall Submit, In Writing, The Name Of The Site Manager. The Contractor Shall Supply Telephone, Cell Phone, And/or Pager Numbers To The Tpoc For Use In Contacting The Site Manager. The Site Manager Shall Conduct Overall Management Coordination And Shall Be The Central Point Of Contact With The Government For Performance Of All Work Under This Contract. The Site Manager Shall Be Authorized To Receive Any Notices Of Deficiency In Contract Performance. The Notices May Include, But Not Be Limited To, The Following: Non-performance Of Work, Deficiencies In Work Performed And Notices Of Proposed Payment Withholding Until Deficiencies Are Corrected Due To The Above. The Site Manager Shall Be Available Weekdays, Between The Hours Of 8:00 A.m. And 3:00 P.m., Within 30 Minutes To Meet At The Facility To Discuss Problem Areas. all Personnel Employed By The Contractor Shall Be Experienced In The Type Of Work Involved And Familiar With The Specifications Of This Contract. the Contractor Is Required To Provide Necessary And On-going Tenant Relations Or Customer Service Training For Their Employees. contractor Personnel Shall Conduct All Operations In Such A Manner As To Minimize Any Inconvenience In The Use Of The Facilities To The Occupants. scheduling Work And Reporting Requirements within Five Work Days Of The Contract Starting Date, And Annually Thereafter For Renewal Periods, The Contractor Shall Submit To The Tpoc Schedules And Plans To Accomplish Required Services Throughout The Year. If Changes Need To Be Made To Reduce Conflicts With Government Operations, Special Events, Or Other Occurrences, The Contractor Shall Meet With The Tpoc And Revise The Schedule As Necessary. The Tpoc May Request Changes To The Monthly Work Schedule So Spacing Of Services Is Distributed To Meet The Needs Of The Government. The Contractor Shall Not Deviate From This Schedule Without Prior Approval From The Tpoc. quality Control Program the Contractor Shall Establish A Complete, Written, Quality Control Program (qcp) To Ensure That The Requirements Of The Contract Are Provided As Specified. The Written Qcp Shall Be Submitted To The Tpoc Within 5 Days Of The Start Date Of Work. the Qcp’s Purpose Is To Provide A Plan For Meeting All Requirements Of This Contract. The Qcp Should Include, But Not Be Limited To, The Following: an Inspection Of The Grounds Which Covers All Services Stated In “performance Standards And Guideline Requirements” Of This Contract. a System To Ensure That The Contractor’s Employees, Or Subcontractor’s Employees, Are Notified Of All Deficiencies In Their Area Of Responsibility. A System And Plan To Retrain Employees To Ensure That Deficiencies Do Not Reoccur. a Plan For Monitoring And Correcting Customer Complaints. A Record Of Customer Complaints And The Corrective Action Taken Must Be Kept On File At This Site And Available For Review By The Contracting Officer Or His/her Representative, At Any Time. a Plan For The Immediate Forwarding Of Customer Complaints That Are Not The Responsibility Of The Contractor, To The Tpoc Or Their Designated Representative. the Qcp Must Be Kept Current, Reflecting The Pertinent Contract Modifications And Requisite Changes Or Conditions. The Contractor Shall Review The Plan With His Onsite Personnel To Ensure Complete Understanding. A Copy Of The Most Current Qcp Must Be Kept On File At The Worksite Where The Tasks Are Being Accomplished. if The Contractor Is Not Meeting Performance Or Quality Measures, The Government Retains The Right To Review The Qcp And Related Documents. Upon Review Of The Plan And Related Documents, The Government Will Take Appropriate Action To Ensure That All Quality And Performance Measures Are Met As Specified In This Contract. performance Standards And Guideline Requirements note: All Services Provided Under This Contract Are Required To Meet The Quality And Performance Standards Described Herein. the Contractor Shall Provide All Labor, Equipment, Materials, Supplies, And Supervision To Perform Grounds Maintenance And Landscape Services As Identified In The Statement Of Work. the Following Guidelines Describe What Is Considered To Be The Normal Industry Quality And Performance Standards For Intended Services Under This Type Of Contract. the Contractor, Through Innovation, Technology Or Other Means, Shall Perform The Required Services In Order To Meet The Quality And Performance Standards. the Following Guidelines Are For Reference Only And Final Results Will Be The Determining Factor For The Success Or Failure Of This Contract. Performance Will Be Based On The Contractor’s Effort In The Meeting The Performance And Quality Standards, Not The Frequency Or Method Of Performance. mowing And Trimming Operations: the Contractor Shall Be Responsible For Monitoring The Growth Of The Grass And Scheduling Cutting/mowing Operations, But In General Mowing And Trimming Operations Should Occur Weather Permitting On A Weekly Basis From March 1 Through October 31. the Contractor Shall Maintain A Grass Height Between 2” And 2 ½” In Order To Prevent Scalping. Uneven Mowing And Rutting By Equipment During Contractor Operations Must Be Avoided. the Government Is Not Responsible For Damage To Contractor’s Equipment Due To Trash, Debris, Or Uneven Terrain. contractor Shall Maintain All Open Drainage Systems; Open Culverts Under Driveways And Roads Free Of Debris, Trash, Limbs, Leaves And Grass Clippings. grass And Weeds Shall Be Trimmed Around Trees, Shrubs, Buildings, Fences, Poles, Posts, Fire Hydrants, Parking Lot Bumper Blocks And Other Fixed Obstacles Concurrent With Mowing Height To Give A Well-manicured Look At All Times. grass Clippings Shall Be Removed To Provide A Uniform Appearance After Mowing. the Contractor Must Exhibit Care Around/near Parked Vehicles During Mowing And Trimming Operations So To Not Cause Damage. It Is The Responsibility Of The Contractor To Repair Any Vehicle Damage That Occurred At A Result Of Negligence During Mowing And Trimming Operations. grounds Maintenance. all Turf Areas Will Be Fertilized Four Times Annually With A Balanced Lawn Food To Ensure A Thick Healthy Lawn. all Flowers, Plants, Shrubs, And Trees Will Be Fertilized As Needed To Maintain A Healthy Condition. fertilizers Shall Be Standard Commercial Grade Of Organic Or Inorganic Fertilizer Of The Kind And Quality Specified Per Results Of Soil Testing By The Contractor And Appropriate To Industry Standards. The Contractor Shall Notify The Tpoc Prior To The Beginning Of Each Fertilizer Application And Post Flags Indicating The Application. The Contractor Shall Apply Fertilizer In Compliance With Instruction And Conditions Contained On Labels And Required By The Environmental Protection Agency, State And Local Regulations. Material Safety Data Sheets (msds) Will Be Available At All Times. the Use Of Compatible Sod Or A Grass Seed Mixture Should Be Used To Fill In Damaged Grass Areas Or Areas Without Grass. edging. grass Shall Be Cut Back From All Edges 0.5” To 1.5” And Not Cut Deeper Than 1.5” To 2”. edging Shall Include Removal Of Vegetation From Sidewalks (including Cracks And Expansion Joints), Driveways, Concrete Curbs, Planting Beds And Mounds, And Rock Beds. Grass Shall Not Extend Over The Edge Of Any Of The Above Areas. weed And Insect Control. lawns Shall Be Maintained In A Manner To Minimize Annual And Perennial Weeds, Including All Clover And Coarse Grass Species. apply Herbicides And/or Pesticides To Lawns At Least Twice A Year And More Often Than That If Needed To Control Weeds, Clover And Course Grasses Consistent With Industry Standards. flower Beds Shall Be Kept Weed Free By Pulling Weeds Or Applying Herbicides And/or Pesticides. Weeding Is A Year-long Requirement. parking Lots, Walkways, Rock Beds, Fences, And All Building Perimeters Shall Be Kept Free Of Weeds, Grasses, And Leaves All Year Long. apply Herbicides And/or Pesticides To Turf, Shrubs, Trees And Ground Cover Twice A Year And More Often Than That If Needed To Control Insect Infestation. the Contractor Shall Notify The Tpoc Prior To The Beginning Of Each Weed Or Insect Control Application And Post Flags Indicating The Application. The Contractor Shall Apply Pesticides And/or Herbicides In Compliance With Instruction And Conditions Contained On Labels And Required By The Environmental Protection Agency, State And Local Regulations. Material Safety Data Sheets (msds) Will Be Available At All Times. The Contractor Shall Insure Pesticides And Herbicides Used Will Not Injure The Lawn, Shrubs, Trees, Or Any Other Plantings. The Contractor Shall Notify The Tpoc Prior To The Beginning Of Each Fertilizer Application And Post Flags Indicating The Application. mole Control. action Will Be Taken Through Whatever Means Necessary To Minimize The Moles And The Damage They Do To The Turf And Flowerbed Areas. the Contractor Shall Be In Compliance With Instruction And Conditions Contained On Labels And Required By The Environmental Protection Agency, State And Local Regulations. If Chemicals Are Utilized, Material Safety Data Sheets (msds) Will Be Available At All Times. The Contractor Shall Insure What Is Done To Control Moles Will Not Injure The Lawn, Shrubs, Trees, Or Any Other Plantings. If Applicable, The Contractor Shall Notify The Tpoc Prior To The Beginning Of Each Application Of Chemicals And Post Flags Indicating The Application. ant Control. routine Action Will Be Taken Through Means Necessary To Minimize The Ant Mounds And The Damage They Do To The Turf And Flowerbed Areas. annual Applications Of Preferred Treatment (lasts 1 Year From Date Of Application) Will Be Applied At The End Of Winter For Optimum Control In The Most Active Months During Spring/summer. Cost Of The Product, Delivery, And Labor Will Be Included In The Contract. the Contractor Shall Be In Compliance With Instruction And Conditions Contained On Labels And Required By The Environmental Protection Agency, State And Local Regulations. If Chemicals Are Utilized, Material Safety Data Sheets (msds) Will Be Available At All Times. The Contractor Shall Insure What Is Done To Control Ants Will Not Injure The Lawn, Shrubs, Trees, Or Any Other Plantings. If Applicable, The Contractor Shall Notify The Tpoc Prior To The Beginning Of Each Application Of Chemicals And Post Flags Indicating The Application. cleanup. all Grass Clippings, Weeds, And Pruning Shall Be Removed From The Project Site As Necessary. walks And Driveways Shall Be Kept Free Of Equipment And Debris. exterior Walls Of Building Shall Be Kept Free Of Soil. all Trash, Debris And Leaves Shall Be Removed From The Property, Including The Vehicle Parking Lots, Walkways, Flowerbeds, And Lawn Areas. mulch Replenishment. beds Will Be Edged And Cleaned Of All Debris And Weeds Before Adding Mulch pine Straw Mulch Will Be Replenished In All Planting Beds, And Around All Shrubs, Trees And Walkways Twice A Year. Quantities Supplied Must Be Sufficient To Maintain Planting Bed Areas With A Minimum Mulch Depth Of Four (4) Inches, And Tree Mounds With A Minimum Depth Of Six (6) Inches. A Sample Of Mulch Shall Be Submitted To The Tpoc Prior To Application. erosion Control. The Contractor Shall Repair And Fill All Rivulets, Soil Slides, And Washouts When Necessary. pruning. prune All Shrubs To Existing Form Twice During The Growing Season Or As Needed. Trees Shall Be Pruned From Ground Level To Up To 12’ To Improve Form And Remove Dead Wood And Spent Blossoms As Needed. tree And Shrub Suckers, Excess Shoot Growth, And Limbs Shall Be Removed As Needed. Plantings Such As Ground Cover, Perennials, And Bulbs, Shall Be Cut Back As Appropriate For The Species. flowers Replacement. Replace Flowers Twice Annually (march/april And October/november) So That When The Flowers Reach Maturity Each Of The 4 Beds In The Front Of The Building Are Well Covered. damage. If The Government Determines That The Damage To Sprinkler Heads Was Caused By The Contractor, The Contractor Shall Repair/replace Them At No Additional Cost To The Government. final Work. During The Last Two Weeks Of The Contract, The Contractor Shall Leave All Planting Beds, Tree Mounds, And Rock Beds In A Weed Free Condition. Grass Shall Be Mowed, Weather Conditions Permitting, Regardless Of Height. itemized Services Requriement Sheet the Following Are Services Included Under This Performance- Based Solicitation. The Following Are Major Service Items And Therefore, Some Minor Or Sub Item Services May Not Be Listed. edging erosion Control fertilizing insect/mole Control grass Mowing leaf Removal mulching pruning trimming weeding bed Preparation And Maintenance lawn Maintenance period Of Performance base Year: March 1, 2025 To February 28, 2026 option Year 1: March 1, 2026 To February 28, 2027 option Year 2: March 1, 2027 To February 28, 2028 option Year 3: March 1, 2028 To February 28, 2029 option Year 4: March 1, 2029 To February 28, 2030 technical Points Of Contact noaa/national Weather Service charleston, Sc Weather Forecast Office 5777 South Aviation Avenue charleston, Sc 29406-6162 primary: provided Upon Award backup: provided Upon Award
Closing Date19 Feb 2025
Tender AmountRefer Documents 

National Irrigation Administration Tender

Civil And Construction...+1Irrigation Work
Philippines
Details: Description Invitation To Bid For Construction Of Solar Powered Irrigation Project, Construction Of Reinforced Concrete Tanks And Installation Of Pipelines For Upper Masaba Sip The National Irrigation Administration – Regional Office Ix Bac, Through The Cy 2025 National Expenditure Program (nep) For General Appropriation Act (gaa) 2025 Fund, Invites Contractors To Submit Bids For The Following Contract: Contract Reference No. : Niar9-epa-sip2025-015 (infra) Project Name : Upper Masaba Sip Contract Location : Quiniput, Zamboanga City Scope Of Works : Construction Of Solar Powered Irrigation Project, Construction Of Reinforced Concrete Tanks And Installation Of Pipelines For Upper Masaba Sip Approved Budget For The Contract (abc) : Php 9,894,609.41 Contract Duration : 168 Calendar Days Amount Of Bidding Documents : Php 10,000.00 The Nia – Ro9 Bac Is Conducting An Early Procurement Activity (epa) On Public Bidding For This Contract In Accordance With Republic Act 9184, Otherwise Known As The “government Procurement Reform Act” And Its Revised Implementing Rules And Regulations (rirr). To Be Eligible To Bid For The Above-stated Contract, A Contractor Must Meet The Following Major Requirements: (a) Filipino Citizen Or 60% Filipino-owned Partnership/corporation; (b) Completion Of A Similar Contract Costing At Least 50% Of The Abc, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To Abc. Interested Bidders Are Required To Submit Two (2) Valid Ids Of The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc. Updated Company Profile Shall Also Be Submitted And Presented To The Nia-r9 Bac Secretariat Upon Purchased Of The Bidding Documents. Credit Line Commitment Shall No Longer Be Accepted As An Alternative To The Prospective Bidder’s Computation Of Nfcc Per Gppb Resolution No. 20-2013 Dated July 30, 2013. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion In The Eligibility Check, Preliminary Evaluation Of Bids, Post Qualification, And Award. The Significant Times And Deadlines Of Procurement Activities Are Shown Below: Issuance Of Bidding Documents : December 21, 2024 – January 20, 2025 At 8:30 Am Pre-bid Conference : January 8, 2025 At 9:00 Am Submission Of Bids : January 20, 2025 At 8:30 Am Opening Of Bids : January 20, 2025 At 9:00 Am Interested Bidders May Obtain Further Information From Nia – Ro9 Bac And Inspect The Bidding Documents At The Address Given Below Starting December 21, 2024 – January 20, 2025. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Non-refundable Fee For The Bidding Documents Prescribed In The Above-mentioned List Of Projects. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. Only The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc Shall Be Authorized To Purchase And Submit Bidding Documents. The Use Of Special Power Of Attorney (spa) Is Prohibited As Per Nia Memorandum Circular No.52 Series 2014 Dated December 1, 2014. The Nia – Ro9 Bac Will Hold A Pre-bid Conference On 08 January 2025 At 9:00 Am At Conference Room, National Irrigation Administration – Regional Office Ix, Regional Center, Balintawak, Pagadian City, Which Shall Be Open To All Interested Parties. Bids Must Be Duly Received By The Bac Secretariat Thru Manual Submission At The Office Address As Indicated Below On Or Before 20 January 2025 At 08:30 Am. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Securing Declaration Or Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb. Clause 18.1. Bids Will Be Opened In The Presence Of The Bidder’s Authorized Managing Officer Or Authorized Liaison Officer Of Interested Parties At The Address Below. The Nia – Ro9 Bac Additional Guidelines Is The Conduct Of Site Inspection To Be Scheduled During Pre-bid Conference. • The Certificate Of Site Inspection Shall Be Issued And Signed By The Nia R9 Authorized Representative After The Activity, Which Shall Be Required To Include In The Bid Tender (technical Component). Prospective Bidders Shall Submit Their Sealed Envelopes Together With The Duly Accomplished Forms As Provided In The Bd’s On Or Before The Deadline Of Dropping Of The Bid Documents At The Nia – Ro9 Bac By The Authorized Managing Officer (amo) Or Authorized Liaison Officer Indicated In The Submitted Company Profile/crc Of The Parties. The Liaison Officer Shall Submit A Letter From The Amo Authorizing Her/him To Drop Their Bid, Attend The Bidding Process And Also Submit A Copy Of Company I.d. For Verification. No Special Power Of Attorney (spa) Shall Be Allowed. The Procuring Entity Shall Not Be Held Responsible Of Any And All Bid Documents/proposals Losses. All Interested Contractors/bidders Must Inform The Bac Chairperson Thru Its Secretariat Of Their Documents Submitted In Any Means Provided Above Before The Date Of The Bid Opening To Avoid Late Submission. The Nia – Ro9 Bac Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders, In Accordance With The Provisions Of Section 41 Of Ra 9184 And Its Irr. Pursuant To Nia Memorandum Circular No. 119 S. 2020, Subject: Policy On Utilization Of Videoconferencing, Webcasting Or Similar Technology In The Conduct Of Public Procurement Activities, Procurement Proceedings For The Above Mention Contracts Will Be Held Through Face-to-face Meeting In Combination With Video Conferencing Using Google Meet Thru The Links: Pre-bidding Conference : Https://meet.google.com/hev-uxfp-utg Opening Of Bids : Https://meet.google.com/bkn-midq-rvv 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Completed For The Past Five (5) Years. • Irrigation And Flood Control With Experience In Solar Powered Pumps To Be Eligible To Bid For The Contract, Bidders Must Have Done A Single Largest Completed Contract (slcc) Containing A Category Of Work Which Is The Same As Or Similar To The Major Category Of Works, And Who’s Total Slcc Cost Is At Least 50% Of The Approved Budget For The Contract (abc) To Be Bid. The Above Slcc Must Be Supported By A Copy Of The Contract, Certificate Of Completion, And Owner’s Certificate Of Final Acceptance (1-year After The Issuance Of The Certificate Of Completion) Issued By The Project Owner Other Than The Contractor Or A Final Rating Of At Least Satisfactory In The Constructors Performance Evaluation System (cpes). In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted. 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Interested Bidders Shall Have At Least Or Any Equivalent To Pcab Size Range “small B” Category: C & D (per Pcab Board Resolution No. 201, Series Of 2017) 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel Relevant Experience General Experience Number Project Engineer 5 Years Licensed Civil Engineer. Shall Render Full-time Service To The Project Until Completion. 5 Years 1 Office Engineer 3 Years Licensed Civil Engineer. Shall Render Full-time Service To The Project Until Completion. 3 Years 1 Materials Engineer 1 3 Years Shall Be An Accredited Material Engineer Of Dpwh. Shall Render Service To The Project As Required. 3 Years 1 Foreman 5 Years Experienced In Irrigation Structures. Shall Render Fulltime Service To The Project Until Completion. 5 Years 1 Safety & Health Officer (so2) 3 Years Shall Have At Least 3 Years’ Experience In Construction Industry. Completed Cosh Training And Shall Render Fulltime Service To The Project Until Completion. 3 Years 1 Geodetic Engineer 3 Years Licensed Geodetic Engineer. Shall Render Service To The Project As Required. 3 Years 1 Electrical Engineer 3 Years A Licensed Electrical Engineer With Experience In Solar Powered Irrigation Projects. Shall Render Service To The Project As Required. 3 Years 1 Mechanical Engineer 3 Years A Licensed Mechanical Engineer With Experience In Solar Powered Irrigation Projects. Shall Render Service To The Project As Required. 3 Years 1 The Contractor May Assign Other Support Personnel From Those Listed For The Optimal Performance Of The Project Construction Team. The Support Personnel Shall Undertake The Required Day-to-day Site Or Office-related Activities Of The Contractor. Full Time Services Mean, The Personnel Involved Shall Render Minimum Of Eight (8) Hours A Day Or Forty (40) Hour A Week And Shall Be Available Upon Request Of The Procuring Entity. 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity No. Of Units Crawler Type Drilling Rig (rotary Or Hydraulic Driven) 100m 1 Generator Set 15kva 1 Welding Machine 300a 1 Dumptruck 6 Cu.m 1 Concrete Mixer 1 – Bagger 1 Butt Fusion Machine Up To 6” Diameter 1 Survey Instrument 1 Set Initial Equipment Requirement Upon Mobilization: Equipment Capacity No. Of Units Crawler Type Drilling Rig (rotary Or Hydraulic Driven) 100m 1 Dumptruck 6 Cu.m 1 Survey Instrument 1 Set The Proof Of Ownership Of Equipment Requirements Are Copies Of Current Lto Official Receipt (or) And Certificate Of Registration (cr) Of The Equipment Which Should Be Attached Together With The Affidavit Of Ownership. In Case Of Leased Equipment, A Lease Contract And Affidavit Of Commitment Or Certificate Of Availability Of Equipment Should Be Submitted With The Lessor/owner As The Pledger Of The Equipment, Stating Therein That The Equipment Will Be Available For The Whole Duration Of The Project. For Purchase Agreement, The Description Of The Equipment To Be Purchased Such As Brand/model, Type Of Equipment, Motor No., Body No. And The Capacity Must Be Indicated In The Document, Otherwise, The Bac Will Not Honor The Purchase Agreement And The Bidder Will Be Declared As Non-complying. Likewise, List Of Contractor’s Major Equipment Units Pledged To Be Used For The Project Must Be Supported By Proof Of Ownership If It Is Owned, Lease Agreement If It Is Being Leased And Purchase Agreement If To Be Purchased. A Certification Of Availability Of Equipment For The Duration Of The Project Must Also Be Provided By The Equipment Owner And/or Lessor/vendor. The Bidder Should Also Specify In The Submitted Bid The Location Of The Equipment Where It Can Be Inspected. If Any Piece Of Equipment Is Not In The Specified Location, Then The Bidder Shall Be Post-disqualified. Item No. Description Qty Unit I Temporary Works & Mobilization/demobilization Mobilization/demobilization 1.00 Ls Temporary Facilities 1.00 Ls Project Billboard 1.00 Ls Ii Construction Safety & Health 1.00 Ls Iii Construction Of Solar Pump Irrigation System Well Drilling, Development And Testing W/ 6" Casing (until Good Aquifer Is Reached.) 1.00 Lot Solar Module Mounting Structure 1.00 Lot Solar Power Controller Housing (4x2 Meters) 1.00 Lot Perimeter Fence 1.00 Lot Delivery And Installation Of Lightning Arrester 1.00 Lot Pv Modules-solar Panels 600 Watts (please See Attached Plans.) 1.00 Lot 5hp Hybrid Ac/dc Submersible Water Pump Power: 5.5hp/4000w Voltage (ac): 85v-280v Voltage (dc): 80v-550v Max. Flow: 19m³/h Max. Head: 135m Outlet: 2" Body Diameter: 3 3/4" 1.00 Lot Hybrid Dc/ac Controller (11kw) 1.00 Lot Delivery & Installattion Of Cabling & Accessories For Solar Pump System 1.00 Lot Cctv Security System 1.00 Lot Construction Of Reinforced Concrete Tank Common Excavation (manual) 91.14 Cu.m 3000 Psi Concrete 66.87 Cu.m Rsb (cutting, Bending & Placing Of Rebars) 5,969.76 Kg Rc Tank Accessories (gate Valve, Pipes, Etc) 3.00 Ls Common Backfill (manual) 118.47 Cu.m Installation Of Water Distribution Pipe W/ Appurtenant Structures Common Excavation (manual) 266.64 Cu.m 4" Ø Hdpe Pipe Sdr 11 (w/ Free Delivery, Connectors& Fittings) 590.00 Ln.m 3" Ø Hdpe Pipe Sdr 11 (w/ Free Delivery, Connectors& Fittings) 570.00 Ln.m Air Release Valve Installation With Accessories 3.00 Ls Water Top Stand 4.00 Set Common Backfill (manual) 134.23 Cu.m
Closing Date20 Jan 2025
Tender AmountPHP 9.8 Million (USD 168.9 K)

DEPARTMENT OF EDUCATION SCHOOLS DIVISION OF EASTERN SAMAR Tender

Education And Training Services
Philippines
Details: Description Procurement Of Inclusive Learning Resource Centers Assistive Devices, Equipment, Supplies And Materials (lot 8- Support Service Area: Daily Living Skills) 1. The Deped Schools Division Of Eastern Samar, Through The General Appropriation Act Of 2024 Intends To Apply The Sum Of ₱ 75,464.18 Being The Abc To Payments Under The Contract For Procurement Of Inclusive Learning Resource Centers Assistive Devices, Equipment, Supplies And Materials (lot 8- Support Service Area: Daily Living Skills) Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Deped Schools Division Of Eastern Samar Now Invites Bids For The Above Procurement Project. Bidders Should Have Completed, Within 5 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. 4. Prospective Bidders May Obtain Further Information From Deped Schools Division Office Of Eastern Samar And Inspect The Bidding Documents At The Address Given Below During Monday-friday, 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Php 500.00. It May Also Be Downloaded From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Nonrefundable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Deped Schools Division Of Eastern Samar Will Hold A Pre-bid Conference On January 13, 2025, 10:00am At The Bac Office, Deped Schools Division Of Eastern Samar Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before January 27, 2025, 9:00am Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 27, 2025, 10:00am At The Given Address Below Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. Only The Proprietor Or Authorized Representative May Be Allowed To Purchase Bidding Documents. Letter Of Intent (loi), Special Power Of Attorney (spa) (for Authorized Representative), And Drl (document Request List From Philgeps) Are Required Upon Purchase. 11. The Deped Schools Division Of Eastern Samar Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Items, Specifications, Quantity Of Delivery, And Abc: Storage Organizer, Megabox Plastic Drawer 5 Layers Dimensions: L=34.3c, W=41.5cm, H=104cm Wt. 5.5kg Item Code: Mg164-5 1 Unit Wooden Bookshelf, Fineline Bamboo Storage Shelf 100*50*25cm 1 Piece Dressing Mirror, Full-length Mirror 121x31cm Floor Standing Or Wall Type 1 Piece Dish Towels, Made Of Premium Cotton Material For Durable And Long-lasting Use. Durable With Excellent Cleaning Performance. 35x35x0.2cm/13.8x13.8x0.1inch, 6 Pcs/set 1 Pcs./set Cabinets, 22cm Gap Cabinet Drawer-type Storage Cabinets, Plastic 3 Pieces Sink, 3mm Thickness, 40x40cm, Stainless Steel 1 Piece Soap Dish, Soap Dish Case Plastic Holder Box, Acrylic 2 Pieces Detergent, Laundry Powder Detergent 630g 1 Set Hand Soap, Anti-bacterial With Skin Protection Liquid Hand Soap (250 Ml) Dermatologically Tested, Helps Reduce Bacteria Accumulation By 99.9% 1 Piece Pots, European High Scoup Pot High Quality, Stainless Steel, 24c/26cm, Height 17.5cm, Thick And Durable 3 Pieces Pans, Glory Shop Korean Non-stick Frying Pan, Diameter:26cm, Depth: 5cm, Non-stick, Dishwasher Safe, 2.0mm Frying Pan Thickness 3 Pieces Toilet Paper Holder, Pozzi Nami Toilet Paper Holder, Finish: Glossy, Material: Zinc 1 Piece Dipper, Material:plastic, Handle Length: 12cm, Diameter: 14.5cm, Depth:11 Cm 1 Piece Pail, Supported Weight: 0.2kg, Materials: Polypropylene 1 Piece Toilet Bowl, Application: Floor Mount, Finish:glossy, Material: Vitreous China; Size: 725x370x775mm, Tank Fittings:standard, Seat Cover: Regular Seat & Cover, Liters Per Flush: 3&6 Liters, Flushing Sysem: Wash Down, Shape:round 1 Piece Trash Can, Height: 42cm, Length:22cm, Width: 22 Cm, Capacity:11 Liters 2 Piece Toothbrush, Colgate 360 Advanced Toothbrush Twin Pack, Innovative Cheek And Tongue Cleaner Design, 4-zone Bacteria Removing Action, Advanced Multi-action Bristle Design 2 Packs Hairbrush, Fashion Detangling Hair Brush, Suitable For All Types Of Hair 2 Piece Comb, Joy Fashion Anti-static Handy Hair Comb, Size: 14.5cmx3.5cm 2 Piece Toothpaste, Unique Toothpaste Doublemint Advanced Oral Care 150 Ml 2 Piece Plastic Tumbler, 12 Oz Clear Jollibee Style Drinking Tumbler Plastic Drinking Cup, Size 7*14cm 12 Pieces Razor, Gillette Daisy Plus 2 Bladed Women's Disposable Razor 6 Piece Nail Clipper, Groovy Extra-large Chrome Nail Clipper With Inner File/nail Cutter, Material: Chrome, Length:9.5cm, Weight:51 Grams 2 Pieces Nail File, Omg Zebra Nail Care File, For Smoothing And Shaping The Edges Of Nails, Lightweight And Made With Quality Materials 3 Pieces Deodorant, Nivea Extra Whitening Deo Roll, 25ml, 48-hour Anti-perspirant Protection 1 Piece Face Towel, Linen N' Things Face Towel, 30x30cm 3 Pieces Feminine Napkin, Charmee Sanitary Napkin All-flow With Wings Sulit Pack 20's, With Micro Dimple Cover And Quick Absorbing Plus Leak Control Channels 2 Packs Dust Catcher With Broom, 1 Set Of Plastic Broom With Dust Pan 1 Piece Feather Duster, Washable Anti-static Duster With Soft Microfiber For Cleaning, Flexible Head, Material: Pp+microfiber, Length:56cm/22.05inch, Weight:180 Grams 1 Piece Wash Rags, Ogmy Kitchen Dish Wash Towel,16x27cm, Material;microfiber 5 Pieces Floor Mop, 3m Scotch Brite Wide Cotton Mop, Material Cotton And Polyester With Coated Steel Handle 1 Piece Garbage Can, Square Trash Bin 15 Liters, Swing Type Cover, Dimension: 24x25x41cm 1 Piece Sponge, 3m Scotch Brite Wide Heavy Duty Scrub Sponge, Material: High-quality Nylon Polyester Web 2 Pieces Spray Bottle, Plastic Pet 500 Ml Trigger Sprayer Bottle, Round Nozzle 2 Pieces Table Napkins, White Table Napkins, 6x6/7x7,or 8x8 5 Pieces Placemat, Anti-slip, Woven, Rectangular Design Placmat, Material: Pvc 6 Pieces Plates, Happy Go Round Porcelain Dinner Plate (set Of 6), Dish Washer Safe, Size: 6-10 Inches, Material:high Grade Porcelain, Microwave, Diswahser And Oven Safe 1 Set Drinking Glasses, Delisoga Clear Drinking Water Glasses (6pcs/set), Material: Lead Free Glass, Volume Capacity: 360ml, Size: 23*15*14cm, Packing: 6 Pcs/1 Set 1 Set Pitcher, Orocan Oval Pitcher, Dimesions: 22cmx18cm, Swivel Flip, Capacity: 2 Liters 1 Piece Bowls, Smart Kitchen Salad Bowl,material:porcelain, Color: White, Weight: 415 Grams, Size: 8 Inch Diameter, Dishwasher Safe 2 Pieces Water Pail, 5-gallon White/cream Pail 1 Piece Laundry Bar Soap, Perla Hypoallergenic Laundry Soap Cut Bar, 110g, Original White Variant: With Natural Coconut Oil Ingredients 12 Pieces Clothesline, 3/5 Meter Non-slip Clothesline, Supported Weight:3kg, With Special Grids/fence-like Design, Retractable 2 Pieces Clothes Pins, 20 Pcs Plastic Clothespins (20 Pcs/pack), Material: Plastic, Size: Approx. 5 Cm 2 Packs Wash Basin, Round Wash Basin, Supported Weight: 0.3kg, Non-toxic, Durable Plastic, Dimensions: 26.6x26.6x10cm, Material: Polyethylene Terepthalate (pet) 1 Piece Laundry Bag, Size: 61x92cm, 5 Pcs/set Included: 1 Pc 30*40cm + 1 Pc 40*50cm + 1 Pc 50*60cm + 1 Pc 15*16cm Bra Bag + 1 Pc 22*33cm Cylindrical Bag 1 Set Ironing Board, 36" Wooden Ironing Board With Metal Stand, Adjustable Height 1 Piece Flat Iron, Hanabishi Flat Iron, Soleplate Type: Coated Non-stick, Iron Features, Temperature Control, Weight: 1.1kg, Input Voltage: 220v, Dimensions: 235x112x108 1 Piece Hangers, 12 Pcs Flat Hanger, Material: Durable Plastic, Length:36cm, Supported Weight: 0.5kg, Color: Black, Dimensions: Lwh 36x10x17 1 Pack Socks, Shoeper (plain And Colored Casual Ankle Socks), Clothing Material:cotton, Pattern:solid Color 2 Pairs Dress, Short Sleeved Dress, Dress Length: Knee Length 1 Piece Slippers, Unisex Slippers,material: Good Rubber Material 2 Pairs Bed Frame, Single Bedframe, Width:36 Inches, Length:75 Inches 1 Unit Mattress, Uratex Foam Mattress, With Washable Cotton Cover, Dimension (30x75) 5 Piece Pillows, Star Market High Quality Comfortable Plain White, Soft Pillow, Size:18x28 Inches 10 Pieces Bed Sheets, Socone 3in1 Us Cotton Single Bedsheet Set, Material: Cotton+polyester, Packaging Content: 2 Pcs Pillow Case, 1 Pc Fitted Sheet, Single Size:36"*75"+7.8", Pillow Case Sice: 18'*28", Garterized Corners 10 Sets Alarm Clock, 4 Inch Simple Nordic Silent Pointer Desktop Round Alarm Clock, Weight 257g, Size: 12*11.5*6cm/4.72*4.53*2.36", Metal, With Night Light, Uses Two Aa Batteries 1 Piece Washing Machine, Width: 93cm Height: 99cm Length: 53cm Gross Weight: 29kg Washing Machine Type: Twin Tub Net Weight: 24.5kg Washing Capacity: 11kg Drying Capacity: 7.5kg Bigger Wash Capacity With Hydrodynamic Wave Pulsator Bigger Spin Capacity Durable Rust Proof Body Safety Spin Lid With Overflow Filter Big Knobs Drag Type Lint Filter Durable Plastic Material Gear Drive System Long Pulsator Rotation Color: White Body & Aquamarine Lid Type A -2 Flat Prong Plug 2 Piece Abc = 75,464.18
Closing Date28 Jan 2025
Tender AmountPHP 75.4 K (USD 1.2 K)

Municipality Of Upi, Maguindanao Tender

Machinery and Tools
Philippines
Details: Description Item No. Quantity Unit Item Description Lot A. Supply Of Labor B.5 1 2.01 Person/hour Construction Foreman 2 2.01 Person/hour Skilled Labor 3 4.02 Person/hour Unskilled Labor B.7(2) 1 36.00 Person/hour A. Certified Safety Engineer 2 144.00 Person/hour B. Health Personnel B.8(1) 1 5,472.00 Person/hour A. Traffic Controller 102(1) 1 23.00 Person/hour Construction Foreman 2 69.00 Person/hour Unskilled Labor 103(1)a 1 4.80 Person/hour Construction Foreman 2 14.40 Person/hour Unskilled Labor 104(2)a 1 27.66 Person/hour Construction Foreman 2 55.33 Person/hour Unskilled Labor 105(1)a 1 24.17 Person/hour Construction Foreman 2 48.33 Person/hour Unskilled Labor 200(1) 1 145.00 Person/hour Construction Foreman 2 290.00 Person/hour Unskilled Labor 311(1)c1 1 103.57 Person/hour Construction Foreman 2 414.29 Person/hour Skilled Labor 3 1,242.86 Person/hour Unskilled Labor 404(1)a 1 0.35 Person/hour Construction Foreman 2 0.70 Person/hour Skilled Labor 3 2.80 Person/hour Unskilled Labor 405 (1)b3 1 15.00 Person/hour Construction Foreman 2 60.00 Person/hour Skilled Laborer 3 120.00 Person/hour Unskilled Laborer Installation & Removal Of Formwork/falseworks 1 60.00 Person/hour Skilled Laborer 2 120.00 Person/hour Unskilled Laborer 500(1)a3 1 4.56 Person/hour Construction Foreman 2 9.12 Person/hour Skilled Labor 3 18.24 Person/hour Unskilled Labor 500(1)a1 1 7.04 Person/hour Construction Foreman 2 14.08 Person/hour Skilled Labor 3 28.16 Person/hour Unskilled Labor 612(1) 1 17.40 Person/hour Construction Foreman 2 34.80 Person/hour Skilled Labor 3 104.40 Person/hour Unskilled Labor 612(2) 1 8.70 Person/hour Construction Foreman 2 17.40 Person/hour Skilled Labor 3 52.20 Person/hour Unskilled Labor Lot B. Equipment Rental A.1.2 (4) 1 3.80 Unit/month A. Pick-up, 4 X 2, 2.5l Diesel Engine (brand New) B.8(1) 1 60.80 Unit/hour Two-way Radio (w/lifespan Consideration Of 2 Years) 2 334.40 Unit/hour Barricade Flasher Light (3 Volt, Battery Operated,amber Color,w/ Lifespan Consideration Of 6 Month) B.9 1 16.00 Unit/hour Mobilization/demobilization (1% Of Direct Cost Of Civil Works) 2 8.00 Unit/hour Payloader 3 8.00 Unit/hour Backhoe 4 8.00 Unit/hour Backhoe W/ Breaker 5 8.00 Unit/hour Truck Mounted Crane 2 6 8.00 Unit/hour Motorized Road Grader 7 8.00 Unit/hour Vibratory Roller 8 8.00 Unit/hour Water Truck/pump 9 32.00 Unit/hour Transit Mixer 10 8.00 Unit/hour Concrete Batch Plant 11 8.00 Unit/hour Jackhammer 12 8.00 Unit/hour Cargo/service Truck 1 102(1) 1 46.00 Unit/hour Dump Truck , All Models 2 23.00 Unit/hour Backhoe ( 0.80m3/1.04 Yd3 3 2.30 Unit/hour Payloader ( 1.5 M3/1.95 Yd3) 4 Minor Tools (10% Of Labor Cost) 103(1)a 1 9.60 Unit/hour Dump Truck (12 Yd3) 2 4.80 Unit/hour Backhoe ( 0.80 M3.1.04 Yd3) 3 Minor Tools (10% Of Labor Cost) 104(2)a 1 27.66 Unit/hour Motorized Road Grader 2 27.66 Unit/hour Vibratory Roller ( 10 Mt) 3 6.92 Unit/hour Water Truck/pump ( 16000 L) 105(1)a 1 24.17 Unit/hour Motorized Road Grader 2 24.17 Unit/hour Vibratory Roller ( 10 Mt) 3 6.04 Unit/hour Water Truck/pump ( 16000l) 200(1) 1 145.00 Unit/hour Motorized Road Grader 2 145.00 Unit/hour Vibratory Roller ( 10 Mt) 3 36.25 Unit/hour Water Truck/pump ( 16000 L) 311(1)c1 1 414.29 Unit/hour Transit Mixer 2 207.14 Unit/hour Concrete Vibrator 3 103.57 Unit/hour Concrete Batch Plant 4 103.57 Unit/hour Payloader 5 103.57 Unit/hour Concrete Screeder 6 103.57 Unit/hour Water Truck/pump 7 103.57 Unit/hour Concrete Saw 8 10.36 Unit/hour Bar Cutter 9 10.36 Unit/hour Sealer, Joint (machine) 10 Minor Tools (5% Of Labor) 404(1)a 1 0.05 Unit/hour A. Cargo Truck (9 - 10 T) 2 0.18 Unit/hour B. Bar Cutter 3 0.18 Unit/hour C. Bar Bender 405 (1)b3 1 15.00 Unit/hour One Bagger Mixer ( 4-6ft3/min 2 15.00 Unit/hour Concrete Vibrator 3 1.50 Unit/hour Water Truck/pump ( 16000 L) 500(1)a3 1 2.32 Unit/hour A. Backhoe (0.80 Cu.m.) 2 2.32 Unit/hour B. Plate Compactor (5 Hp) 3 Minor Tools (10% Of Labor Cost) 500(1)a1 1 3.52 Unit/hour A. Backhoe (0.80 Cu.m.) 2 3.52 Unit/hour B. Plate Compactor (5 Hp) 3 Minor Tools (10% Of Labor Cost) 612(1) 1 17.40 Unit/hour Cargo/service Truck 1 2 17.40 Unit/hour Applicator Machine 3 17.40 Unit/hour Kneading Machine 4 Minor Tools (10% Of Labor Cost) 612(2) 1 8.70 Unit/hour Cargo/service Truck 1 2 8.70 Unit/hour Applicator Machine 3 8.70 Unit/hour Kneading Machine 4 - Minor Tools (10% Of Labor Cost) Lot C. Supply & Delivery Of Construction Materials A.1.1 (8) 1 3.80 Mo. A. Rental Of Field Office B.3 1 13,252.00 Cu.m. A. Mineral Tax (provincial Tax Ordinance) 2 1.00 Lot B. Excise Tax (provincial Tax Ordinance) 4% Mineral Tax B.5 1 96.00 Sq.ft A. Tarpaulin ( 4'x 8') 2 378.00 Bd.ft B. Lumber ( Coco) 3 9.00 Pcs. C. Marine Plywood( 1/4'' X 4'x 8') 4 3.78 Kg D. Asst. Cwn 5 192.00 Sq.ft E. Tarpaulin ( 8'x 8') B.7(2) 1 1,309.00 Man-day A. Safety Helmet 2 678.00 Man-day B. Safety Shoes 3 1,309.00 Man-day C. Safety Vest 4 1,309.00 Man-day D. Working Gloves 5 632.00 Man-day E. Rubber Boots 6 120.00 Man-day F. Dusk Mask 7 120.00 Man-day G. Rain Coat B.8(1) 1 7.60 Each A. Speed Restriction (r4-1) 2 7.60 Each B. Road Work Ahead (t1-1) 3 7.60 Each C. End Roadwork (t2-16) 4 7.60 Each D. End Speed Restriction (r4-2) 5 7.60 Each E. Lane Status (t2-6-1) 6 7.60 Each F. Workmen Ahead (t1-5) 7 7.60 Each G. Prepare To Stop (t1-18) 8 3.80 Each H. Temporary Hazard Marker (chevron, T5-5) 9 68.40 Each I. Plastic Safety Barriers 10 68.40 Each J. Construction Safety Fence 11 15.20 Each K. Temporary Bollards (@5 Meters Apart) 12 7.60 Man-day L. Safety Vest 13 7.60 Man-day M. Hard Hat 14 7.60 Man-day N. Safety Shoes 104(2)a 1 1,729.01 Cu.m. Common Borrow (w/ 25% Shrinkage Factor) 200(1) 1 8,337.50 Cu.m. Aggregate Subbase Course (w/ 15% Shrinkage Factor) 311(1)c1 1 3,117.50 Kg Reinforcing Steel Bars Deformed Grade 40 2 2,102.50 L Curing Compound 3 870.00 L Asphalt Sealant 4 3,335.00 M Steel Forms 23 Cm Width 5 917.13 Cu.m. Fine Aggregate 6 1,667.50 Cu.m. Gravel G2-1/2 7 15,877.50 Bag Portland Cement (40 Kgs./bag With Advanced Mineral Additives, Conforming To Both Astm C595 And Pns 063) 8 1.09 Pc Concrete Saw (diamond Blade 14''dia) 9 51.48 M Pipe Sleeve, 2'' Dia. 10 63.08 L Grease/tar 404(1)a 1 1.32 Kgs A. Tie Wire (2% Of Rsb) 2 66.15 Kgs B. Reinforcing Steel Bars Grade 40, With 5% Wastage 405 (1)b3 1 525.00 Bd.ft. Lumber Good 2 8.40 Pc. Plywood Marine 1/2" X 4' X 8' (0.0125m X 1.2m X 2.44m) 3 21.00 Kg. Common Nails Assorted 4 199.50 Bag Portland Cement (40 Kgs./bag With Advanced Mineral Additives, Conforming To Both Astm C595 And Pns 063) 5 10.50 Cu.m. Fine Aggregate 6 21.00 Cu.m. Gravel G2-1/2 500(1)a3 1 8.64 Bag Portland Cement (40 Kgs./bag With Advanced Mineral Additives, Conforming To Both Astm C595 And Pns 063) 2 0.49 Cu.m. Fine Aggregate 3 8.00 Pc Reinforced Concrete Pipe Class Iv Dia 36"(910mm) 4 1.02 Cu.m. Fine Aggregate 500(1)a1 1 12.38 Bag Portland Cement (40 Kgs./bag With Advanced Mineral Additives, Conforming To Both Astm C595 And Pns 063) 2 0.70 Cu.m. Fine Aggregate 3 16.00 Pc Reinforced Concrete Pipe Class Iv Dia 24"(610mm) 1.41 Cu.m. Fine Aggregate 1 612(1) 2 141.38 Bag A. Thermoplastic (white) 3 14.36 Bag B. Glass Beads 4 52.20 L C. Primer 5 1.74 Cyl D. Lpg (50kg) 6 0.87 Cyl E. Lpg (12 Kg) 7 54.38 Kg F. Calsumine 8 - - Miscellaneous (5% Of Materials Cost) 612(2) 1 70.69 Bag A. Thermoplastic (white) 2 7.18 Bag B. Glass Beads 3 26.10 L C. Primer 4 0.87 Cyl D. Lpg (50kg) 5 0.44 Cyl E. Lpg (12 Kg) 6 27.19 Kg F. Calsumine Miscellaneous (5% Of Materials Cost) During The Post Qualification The Twg Has The Right To Ask A Purchase Order Incase The Item Is Not Available
Closing Date4 Feb 2025
Tender AmountPHP 24.1 Million (USD 412.6 K)

Rizal Medical Center Tender

Housekeeping Services
Philippines
Details: Description Bids And Awards Committee Request For Quotation Rfq No. 2025-001 The Rizal Medical Center (rizal Med) Through Its Bids And Awards Committee (bac), Hereby Invites All Interested Suppliers Or Distributors Registered With The Philippine Government Electronic Procurement System (philgeps), To Submit Their Quotation On The Project Listed Below, Subject To The General Conditions Stated Herein, And Submit Not Later Than January 20, 2025. Name Of Project: Procurement Of One (1) Lot Pest Control Services For Cy 2025 Mode Of Procurement: Negotiated Procurement Sec. 53.9 – Small Value Procurement Approved Budget For The Contract: Two Hundred Twenty Eight Thousand Pesos (php228,000.00) Terms Of Reference Pest Control Services 2025 I. Objective To Provide Pest Control Services To Rizal Medical Center For The Cy 2025 Ii. Approved Budget For The Contract The Approved Budget For The Contract Is Two Hundred Twenty-eight Thousand Pesos (php228,000.00). Iii. Scope Of Work The Service Provider Shall Provide The Following Pest Control Services For A Period Of One Year (12 Months) To Rizal Med Premises: I. Crawling And Flying Insect Control Frequency • Thermal Fogging Monthly • Misting Monthly • Residual Spraying Monthly • Trapping/baiting As Needed • Spraying And Misting Of Surrounding Quarterly Ii. Rodent Control • Baiting As Needed • Trapping As Needed Iii. Termite Control • Soil Poisoning Once A Year • Residual Spraying Quarterly • Chemical Dusting Quarterly • Termites Mound Examination/ Demolition Quarterly Iv.animal Control • Controlling According To Local Regulations Of Cats, Dogs, Etc. As Needed • Technical And Professional Services The Service Provider Shall Provide The Following Technical Methods And Professional Services For The Effective Pest Control Program Of Rizal Med Premises: A. For Crawling And Flying Insects Control  Thermal Fogging – It Is An Aerial Surface Disinfection Method Which Provides Access To Hard-to-reach Areas And Simultaneously Disinfects Walls And The Atmosphere. It Is An Effective Smoke Odor Removal Procedure Because It Recreates The Fire Related Properties Of Heat And Pressurization.  Misting – Use Of Misting Machines Inside The Offices Which Disperse Minute Droplets Of Insecticide Solution In An Aerosol Range To Attain Minimum Penetration Of Hard To Reach Or Inaccessible Area To Control Mosquitoes And Other Flying Insect O Use Of Foaming/chalk And Gel Bait Inside The Ward And Other Specialty Wards (or, Er, Ob-er, Dr, Rr, Icu, Picu, Nicu, Imcu And Cancer Wards), Will Be In Accordance With The Specification Of Its Toxicologist And Enterologist, Chemicals Used Should Be Approved By The Food And Drug Authority (fda).  Residual Spraying – This Shall Be Done To Facilitate Direct Extermination Of Insects In Places And Areas Where Insects Congregate, Crawl And Hide, Including Cracks And Crevices. It Will Be Applied To Areas Where Fogging Treatment Is Not Available.  Trapping/baiting – Use Of Cage Traps, Glue Board, Snap And Other Mechanical Devices To Augment The Baiting Technique, Installation Of Bait Stations In Hidden Places And Strategic Location Where Crawling Insects Usually Search For Food, Roam Around And Congregate. B. For Rodent Control Regular Treatment By Bait Laying Of Anticoagulant Preparations In Areas Used As Passageway And Harborages Of Rats And Mice, Based On A System Of Permanent/semi-permanent Bait Stations. These Rodenticides Provide Good Control Without Presenting Any Hazard To Products Or Personnel. However, If The Degree Of Infestations Should Ever Warrant It, Acute Bait/chronic Rodenticides Will Be Used, But Only After Close Consultation With Rizal Med And Under The Strict Supervision Of The Engineering And Facilities Management Section. Supplementary Control Methods Such As Mechanical Traps And Sticky Boards, Plugging Or Sealing Off Of Holes That May Serve As Entry Points Will Also Be Employed If The Situation So Warrants. C. For Termite Control 1. Soil Poisoning This Service Shall Be The Application Of Termiticidal Chemicals Along The Perimeter Of Rizal Med. The Service Provider Shall Create A Continuous Chemical Barrier Making It Impossible For Termite To Enter And Destroy The Wooden Structures Of The Buildings Through The Following: A. Drilling Holes 30 Centimeters Apart At The Concrete Perimeter Fence Of The Compound Using An Electric Rotto Hammer Drill, Then Injecting Termiticidal Chemicals, Using A Modern Pressurized Soil Rudder Injector. B. Direct Injection Of Termiticidal Chemicals Along The Concrete And/or Soil Perimeter Of The Building Of The Compound 30 Centimeters Apart Using The Same Procedure And Equipment In 1(a). C. Drilled Holes After Treatment Shall Be Restored To Its Original Appearance Through The Use Of Concrete Mix/cement. 2. Residual Spraying This Shall Be Done To Facilitate Direct Extermination Of Termites On Infested Parts Of The Building. Uninfected Areas Shall Also Be Treated To Provide Adequate Protection. 3. Chemical Dusting The Service Refers To The Application Of Anti-termite Powder To All Joints, Ends, Crevices, Baseboards And Cabinets. Emphasis Of Treatment Shall Be On The Wooden Structures Of The Building. 4. Termites Mound Extermination All Termites’ Mounds Found Within The Rizal Med Building Compound Shall Be Excavated And Exterminate The Queen And Workers Since These Are Infesting The Wooden Structures Of The Building. Terms And Conditions 1. The Service Provider Shall Warrant That The Services To Be Rendered Will Effectively Exterminate All Pests, Insects And Rodents Without The Visible Presence And Disturbing Odor Of Smoke And Fumes. Should Rizal Med Find The Services To Be Ineffective As Evidenced By The Continuous Presence Of Termites, Cockroaches, Mice And Other Common House Pests And Insects, Rizal Med Reserves The Right To Terminate The Contract. In Such Case, The Rizal Med Shall Not Be Obliged To Pay The Service Provider For The Services Rendered. 2. The Service Provider Shall Warrant That All Preparations And Formulations, Including The Use Thereof, Will Be In Accordance With The Specification Of Its Toxicologist And Enterologist, Pyrethroid Insecticides That Are Biodegradable In Nature And Only Chemicals Certified By The Proper Government Authorities As Safe Shall Be Used. 3. The Service Provider Shall Render Pest Control Treatment To The Nutrition And Dietetics Department Twice A Month. 4. The Service Provider Shall Agree That Only Honed, Skilled And Well-trained With Training Certificates Personnel/technicians Will Be Assigned To The Rizal Med Premises To Ensure The Proper Treatment And Application Of Chemicals. 5. The Service Provider Shall Assign A Sufficient Work Force With Proper Personal Protective Equipment (ppe) And Sufficient To Carry Out Or Implement The Service. Assigned Staff Shall Wear Proper Uniform And Identification Card While Within The Rizal Med Premises. 6. The Service Provider Shall Agree That The Required Services Shall Be Conducted From 4:00 Pm – Onwards And Weekends, As May Be Determined By The Rizal Med, In Order Not To Disrupt The Working Schedule Of Rizal Med Personnel. 7. The Service Provider Shall Provide On-call Service In Between Schedule Without Additional Cost To Rizal Med, Including Performing Immediate Special Or Additional Service Should There Be A Sudden Outbreak Of Infestation At The Rizal Medical Center Premises At No Cost To Rizal Med. 8. A Quality Control Supervisor Affiliated With The Service Provider Shall Visit The Rizal Med Premises Quarterly Or Whatever Necessary To Undertake The Following: A. Coordination With Rizal Med Authorized Representative In Evaluating The Effectiveness Of The Pest Control Treatment. B. Serve As Pest Control Consultant By Recommending Ways And Means To Control Infestation. C. Provide Orientation On The Pest Control Management, Handling And Application Of Chemicals To Concerned Rizal Med Personnel. 9. A Penalty Of One-tenth Of 1% (.001) Of The Total Value Of The Undelivered Goods/services Shall Be Charged As Liquidated Damage For Every Day Of Delay Of The Delivery Of The Service. A. Payment Shall Be Done Within Sixty (60) Days Upon Receipt Of The Statement Of Account/billing Invoice, With Complete Supplementary Documents On A Monthly Basis. 10. The Service Provider Must Submit An Accurate Monthly Assessment Report. 11. The Service Provider Shall Cover The Following Areas: Administrative Building 1 Office Of The Medical Center Chief And Board Room 2 Office Of The Chief Of Medical Professional Staff 3 Professional Education, Training, And Research Unit 4 Office Of The Chief Administrative Officer (hopss) 5 Office Of The Chief Administrative Officer (finance) 6 Ent Office (former Chief Training Office) 7 Office Of The Chief Nurse 8 Heart Station 9 Integrated Management Information System Section 10 Quality Improvement, Infection Prevention Control, And Patient Safety Unit 11 Blood Bank 12 Cash Operations Section 13 Billing And Claims Section 14 Admitting And Information Section 15 Security Unit (in-house) Dormitory Building (old) 1 Dormitory 2 Budget Section 3 Accounting Section 4 Coa Auditor’s Office 5 Legal Unit 6 Wound Care Center Office 7 Public Health Unit 8 Planning & Management Unit 9 Hrm/ Psb – Shrpsb Office Other Areas 1 Nutrition And Dietetics Department (weekly) 2 Engineering And Facilities Management Section 3 Powerhouse 4 Housekeeping, Linen & Laundry 5 Materials Management Section 6 Tb Dots 7 New Dormitory 8 Solid And Infectious Waste Storage / All Public Comfort Rooms 9 Chapel 10 Central Supply And Sterilization 11 Health Information Management Department 12 New Er Extension 13 Human Resource Management Section 14 Procurement Section 15 Medical Social Work Department 16 Udds Office 17 Other New Office And Establishments Out Patient Department Complex First Floor 1 Department Of Otorhinolaryngology Head And Neck Surgery 2 Surgery Clinic 3 Opd Central Registration Section 4 Minor Or 5 Opd Laboratory & Drug Testing 6 Pharmacy & Consignment 7 Department Of Radiology And Imaging Science 8 Department Of Physical Medicine And Rehabilitation 9 Pharmacy Department 10 Stone Center Second Floor 1 Social Service (opd & Pasig City Constituents) 2 Dental Department 3 Opd Head 4 Health & Wellness Clinic 5 Cashier 6 Mental Hygiene 7 Pediatric Clinic 8 Medicine Clinic 9 Opd Registration 10 Department Of Obstetrics And Gynecology/ Ultrasound 11 Employees Health Service 12 Neuro Science Third Floor 1 Department Of Opthalmology 2 Family And Community Medicine Department 3 Department Of Dermatology 4 Opd Philhealth ` Diagnostic Center 1 Main Laboratory 2 Nuclear Medicine 3 Molecular Imaging & Radionuclide Therapy Unit/cobalt 4 Department Of Physical Medicine And Rehabilitation 5 Blood Bank 6 Molecular Laboratory 7 Linear Accelerator (linac) Main Building A & B Basement 1 Health Emergency Management Service/er Head Office 2 Emergency Room 3 Dialysis Unit 4 Pharmacy Satellite 5 Er Triage 6 Er Waiting Area 7 Brachy Therapy Treatment 8 Breast Clinic 9 Mammography Section 10 Toxicology First Floor 1 Ob Main 2 Ob Er 3 Delivery Room And Labor Room 4 Neonatal Intensive Care Unit (nicu) 5 Ob Covid 6 Radiation Oncology Unit 7 Milk Bank 8 Netr Office Second Floor 1 Surgery Ward (1) 2 Operating Room 3 Department Of Anesthesiology 4 Recovery Room 5 Intensive Care Unit (icu) 6 Hemodialysis (stock Room) 7 Catheterization Laboratory 8 Surgical Intensive Care Unit (sicu) 9 Social Service Office 10 Food Hall Third Floor 1 Surgery Ii 2 Pedia I 3 Pediatric Intensive Care Unit (picu) 4 Pedia Ii 5 Department Of Pediatrics 6 Department Of General Surgery 7 Social Service Office Fourth Floor 1 Medicine Ward 2 Philhealth Ward 3 Medicine Department Office 4 Imcu 5 Institutional Review Board 6 Pulmonary/ Respiratory Unit 7 Office Of The Rotator’s Manager Fifth Floor 1 Ob Annex 2 Pantry I. General Requirements: 1. Original Signed Price Quotation 2. Certified True Copy Of The Following: A) Philgeps Certificate/registration No. B) Mayor’s/business Permit 3. Duly Notarized Omnibus Sworn Statement Together With Original Notarized Secretary’s Certificate Or Original Special Power Of Attorney 4. Documentary Requirements Must Be Submitted To The Bac Secretariat Not Later Than The Deadline. Ii. General Conditions: • All Quotations Shall Be Considered Fixed Price, And Not Subject To Price Escalation During Contract Implementation. • Supplier/contractor/ Service Provider Is Entitled To One (1) Quotation Only; Otherwise All Quotations Made Shall Automatically Be Rejected. Iii. Terms Of Payment • Payment Shall Be Based On Actual Deliveries Made By The Supplier/contractor/ Service Provider. • The Terms Of Payment Shall Not Be Later Than Sixty (60) Days After Submission Of Sales Invoice And Complete Supporting Documents By The Supplier/contractor. • Pursuant To Circular Letter No. 2013-16 Of Department Of Budget And Management Dated December 23, 2013, The Supplier/contractor Is Encouraged To Open An Account With The Land Bank Of The Philippines (lbp), The Government Servicing Bank Of The Procuring Entity, To Facilitate Settlement Of Account Payables Due To The Supplier/contractor. All Charges Incurred For Payment Through Bank Transfer With Other Banks Shall Be For The Account Of The Supplier/contractor. Iv. Delivery Term • Delivery Term Shall Be One (1) Year (12 Months) Upon Receipt Of A Notice To Proceed. For Further Inquiries, You May Contact The Bac Secretariat At Mobile No. 0917 104-6556. The Quotation And Requirements Must Be Submitted/delivered To The Following Address: Edwin E. Alcazar, Llb,mgm Head, Bac Secretariat Rizal Medical Center Pasig Blvd., Pasig City 1600 Mobile No. 0917 104-6556 The Rizal Med Reserves The Right To Reject Any Or All Quotations/bids, To Waive Any Minor Defects Therein, To Annul The Bidding Process, To Reject All Quotations/bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder(s), And To Accept Only The Offer That Is Most Advantageous To The Government. The Rizal Med Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expenses Incurred In The Preparation Of Their Quotation/bid. Very Truly Yours, (sgd.)santiago G. Cabangon, Cpa, Mba Chairperson, Bids And Awards Committee
Closing Date20 Jan 2025
Tender AmountPHP 228 K (USD 3.8 K)

Municipality Of Irosin, Sorsogon Tender

Electrical Goods and Equipments...+1Electrical and Electronics
Philippines
Details: Description Republic Of The Philippines Province Of Sorsogon Municipality Of Irosin Bids & Awards Committee Invitation To Bid For Supply & Delivery Of One(1) Unit High Volume Low Speed Industrial Ceiling Fan(big Ass) 1. The Local Government Unit Of Irosin, Through The General Fund(capital Outlay) Intends To Apply The Sum Of Five Hundred Thousand Pesos (p 500,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Supply & Delivery Of One(1) Unit High Volume Low Speed Industrial Ceiling Fan(big Ass), Good-07-2024. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Name Of Contract : Supply & Delivery Of One(1) Unit High Volume Low Speed Industrial Ceiling Fan)big Ass) Brief Description: One Unit High Volume Low Speed Industrial Ceiling Fan(big Ass): Diameter:24 Feet(7.3 Meters)/voltage: 230v/3 Phase/motor Rpm: 60/motor Size: 2hp(1.5kw)/material: Aluminum/stainless Steel/fan Weight: 116kg/air Volume: 200-300cfm/airfoils: 8 Patented Powerfoils,8 Patent Pending/air Fences/sealed Gearbox And Industrial Motor/machine-cut Hub System/redundant Safety Features/variable Speed Operation With Controller With Delivery And Installation Works/5 Year Warranty Approved Budget For The Contract : P 500,000.00 Contract Duration : 30 Calendar Days Delivery Period : 7 Calendar Days After The Issuance Of Notice To Proceed Source Of Fund : General Fund(capital Outlay) 2. The Local Government Unit Of Irosin Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By Seven(7) Calendar Days. Bidders Should Have Completed For The Last Two(2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent(60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Local Government Unit Of Irosin And Inspect The Bidding Documents At The Address Given Below From 8:00 Am-5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 31, 2025-february 10, 2025 From The Given Address And Philgeps Website And Lgu-irosin Website And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Hundred Pesos (p 500.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Presenting In Person The Official Receipt Of Bid Documents To The Bac Office. 6. The Local Government Unit Of Irosin Will Not Hold A Pre-bid Conference. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before February 10, 2025, 1:59 Pm At Bac Office, Municipal Compound, San Julian, Irosin, Sorsogon. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On February 10, 2025, 2:00 Pm At The Given Address Below Conference Room, Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 10. The Local Government Unit Of Irosin Reserves The Right To Accept Any And All Bids, Declare A Failure Of Bidding Or Not Award A Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations(irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11.for Further Information, Please Refer To: Lorenzo G. Ubalde Municipal Administrator Municipal Compound, San Julian, Irosin, Sorsogon Url: Www.irosin.gov.ph 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps Website And Www.irosin.gov.ph Date Of Publication: January 31, 2025 _____________________ Noel D. Mercado Ii Bac Chairman ```u Instruction To Bidders 1. Scope Of Bid The Procuring Entity, Local Government Unit Of Irosin Invites Bids For The Supply & Delivery Of One(1) Unit Large Industrial Fan For Lgu-irosin, With Project Identification Number Good-07-2025. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website. The Procurement Project (referred To Herein As “project”) Is Composed Of 1 Lot Large Industrial Ceiling Fan, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below General Fund(capital Outlay) In The Amount Of Five Hundred Thousand Pesos (p 500,000.00). 2.2. The Source Of Funding Is: General Fund(capital Outlay) 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. A.foreign Ownership Exceeding Those Allowed Under The Rules May Participate Pursuant To: Iii. When The Goods Sought To Be Procured Are Not Available From Local Suppliers; Or B. Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No. 9184, The Bidder Shall Have An Slcc That Is At Least One(1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must At Least Equivalent To: A. For The Procurement Of Expandable Supplies: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Twenty Five Percent (25%) Of The Abc. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Twenty Percent (20%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.2 Subcontracting Is Not Allowed During The Bidding. 7.3 Subcontracting Is Not Allowed During The Contract Implementation Stage. 7.4 Subcontracting Of Any Portion Of The Project Does Not Relieve The Supplier Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Not Hold A Pre-bid Conference For This Project. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii( Checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicted In Itb Clause 5.3 Should Have Completed Within The Last Two(2) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostile Convention, Only The Translated Documents Shall Be Authenticated Through The Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii( Checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification From Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 3184. 12. Bid Prices 12.1 Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A.for Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw(ex-works,ex-factory,ex-warehouse,ex-showroom, Or Off The Shelf, As Applicable); Ii. The Cost Of All Custom Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other(incidental) Services, If Any, Listed In The Bds. 13. Bid And Payment Currencies 14.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Adopted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreigh Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: Philippine Pesos 14. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty(120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1 The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 14 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii(technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded As Follows: Option 1- One Project Having Several Items That Shall Be Awarded As One Contract. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Supply & Delivery Of One(1) Unit High Volume Low Speed Industrial Ceiling Fan(big Ass) Brief Description: One Unit High Volume Low Speed Industrial Ceiling Fan(big Ass): Diameter:24 Feet(7.3 Meters)/voltage: 230v/3 Phase/motor Rpm: 60/motor Size: 2hp(1.5kw)/material: Aluminum/stainless Steel/fan Weight: 116kg/air Volume: 200-300cfm/airfoils: 8 Patented Powerfoils,8 Patent Pending/air Fences/sealed Gearbox And Industrial Motor/machine-cut Hub System/redundant Safety Features/variable Speed Operation With Controller With Delivery And Installation Works/5 Year Warranty B. Completed Within The Last Two(2) Years From The Date Of The Submission Of Bids 7.1 Not Applicable Since Sub-contracting Is Not Allowed. 12 The Price Of Goods Shall Be Quoted Ddp Lgu-irosin, Irosin, Sorsogon. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. [two Percent (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. [five Percent (5%) Of Abc] If Bid Security Is In Surety Bond. 19.3 One(1) Unit High Volume Low Speed Industrial Ceiling Fan(big Ass) One Unit High Volume Low Speed Industrial Ceiling Fan(big Ass): Diameter:24 Feet(7.3 Meters)/voltage: 230v/3 Phase/motor Rpm: 60/motor Size: 2hp(1.5kw)/material: Aluminum/stainless Steel/fan Weight: 116kg/air Volume: 200-300cfm/airfoils: 8 Patented Powerfoils,8 Patent Pending/air Fences/sealed Gearbox And Industrial Motor/machine-cut Hub System/redundant Safety Features/variable Speed Operation With Controller With Delivery And Installation Works/5 Year Warranty 20.2 Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It: Bir Registration 21.2 Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It: None General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract(scc). 2. Advance Payment 2.1 Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2 The Procuring Entity Is Allowed To Determine The Terms Of The Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 4. Inspection And Tests The Procuring Entity Or Its Representatives Shall Have The Right To Inspect And/or The Test The Goods To Confirm Their Conformity To The Project. In Addition To Tests In The Scc, Section Vii(technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identify Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 7.1. In Order To Assure The Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 7.2. The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Special Conditions Of Contract Gcc Clause 1 Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: [for Goods Supplied From Within The Philippines] “the Delivery Terms Applicable To This Contract Are Delivered [indicate Place Of Destination]. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is Wilson G. Baliwas. Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: A. Performance Or Supervision Of On-site Assembly And/or Start-up Of The Supplied Goods; B. Furnishing Of Tools Required For Assembly And/or Maintenance Of The Supplied Goods; C. Furnishing Of A Detailed Operations And Maintenance Manual For Each Appropriate Unit Of The Supplied Goods; D. Performance Or Supervision Or Maintenance And/or Repair Of The Supplied Goods, For A Period Of Time Agreed By The Parties, Provided That This Service Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And E. Training Of The Procuring Entity’s Personnel, At The Supplier’s Plant And/or On-site, In Assembly, Start-up, Operation, Maintenance, And/or Repair Of The Supplied Goods. F. No Additional Incidental Service Requirements. The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Spare Parts – The Supplier Is Required To Provide All Of The Following Materials, Notifications, And Information Pertaining To Spare Parts Manufactured Or Distributed By The Supplier: 1. Such Spare Parts As The Procuring Entity May Elect To Purchase From The Supplier, Provided That This Election Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And 2. In The Event Of Termination Of Production Of The Spare Parts: I. Advance Notification To The Procuring Entity Of The Pending Termination, In Sufficient Time To Permit The Procuring Entity To Procure Needed Requirements; And Ii. Following Such Termination, Furnishing At No Cost To The Procuring Entity, The Blueprints, Drawings, And Specifications Of The Spare Parts, If Requested. The Spare Parts And Other Components Required Are Listed In Section Vi (schedule Of Requirements) And The Costs Thereof Are Included In The Contract Price. The Supplier Shall Carry Sufficient Inventories To Assure Ex-stock Supply Of Consumable Spare Parts Or Components For The Goods For A Period Of Twelve(12) Months. Spare Parts Or Components Shall Be Supplied As Promptly As Possible, But In Any Case, Within Twelve(12) Months Of Placing The Order. Packaging – The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. The Packaging, Marking, And Documentation Within And Outside The Packages Shall Comply Strictly With Such Special Requirements As Shall Be Expressly Provided For In The Contract, Including Additional Requirements, If Any, Specified Below, And In Any Subsequent Instructions Ordered By The Procuring Entity. The Outer Packaging Must Be Clearly Marked On At Least Four (4) Sides As Follows: Name Of The Procuring Entity Name Of The Supplier Contract Description Final Destination Gross Weight Any Special Lifting Instructions Any Special Handling Instructions Any Relevant Hazchem Classifications A Packaging List Identifying The Contents And Quantities Of The Package Is To Be Placed On An Accessible Point Of The Outer Packaging If Practical. If Not Practical The Packaging List Is To Be Placed Inside The Outer Packaging But Outside The Secondary Packaging. Transportation – Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip, Or Ddp, Transport Of The Goods To The Port Of Destination Or Such Other Named Place Of Destination In The Philippines, As Shall Be Specified In This Contract, Shall Be Arranged And Paid For By The Supplier, And The Cost Thereof Shall Be Included In The Contract Price. Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Goods Are To Be Transported On Carriers Of Philippine Registry. In The Event That No Carrier Of Philippine Registry Is Available, Goods May Be Shipped By A Carrier Which Is Not Of Philippine Registry Provided That The Supplier Obtains And Presents To The Procuring Entity Certification To This Effect From The Nearest Philippine Consulate To The Port Of Dispatch. In The Event That Carriers Of Philippine Registry Are Available But Their Schedule Delays The Supplier In Its Performance Of This Contract The Period From When The Goods Were First Ready For Shipment And The Actual Date Of Shipment The Period Of Delay Will Be Considered Force Majeure. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Intellectual Property Rights – The Supplier Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 2.2 Partial Payment Is Not Applicable. 4 The Inspections And Tests That Will Be Conducted Are: Inspection Of The High Volume Low Speed Industrial Ceiling Fan If It Follows The Technical Specification Set By The End-user Unit. Section Vi. Schedule Of Requirements The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Total Delivered, Weeks/months Remarks Indicate Here Any Other Appropriate Information As May Be Necessary. Signature Over Printed Name Position Department/division Section Vii. Technical Specifications Item Specification Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] Technical Specifications Technical Specifications Item / Service Maximum Quantity Technical Specifications / Scope Of Work Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution.] Checklist Of Technical And Financial Documents Standard Form Number: Sf-good-06 Revised On: May 24, 2004 A. The Eligibility & Technical Envelope Shall Contain The Following: I. Technical Component Envelope Class “a” Documents Legal Documents • Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; • Registration From Sec, Department Of Trade And Industry(dti) For Sole Proprietorship And Cda For Cooperatives • Valid Mayor’s Permit By The City Or Municipality Where The Principal Place Of Business Is Located • Tax Clearance Per Executive Order No. 398 Series Of 2005 Showing The Current Assets And Current Liabilities Of The Taxpayer • Tax Clearance For Collection Purposes Technical Documents • Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid. The Statement Shall Include: (a) Name Of The Contract (b) Date Of The Contract (c) Kinds Of Goods (d) Amount Of Contract And Value Of Outstanding Contracts (e) Date Of Delivery (f) End-user’s Acceptance Of Official Receipts Issued For The Contract • Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; • Audited Financial Statements, Showing Among Others, The Total And Current Assets And Liabilities, Stamped “received By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Tan Two(2) Years From The Date Of Bid Submission • The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents • If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. B. Technical Requirements Consist Of The Following:: • Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration. Bid Security Should Be In The Form Of: O Cash Issued By A Commercial Or Universal Bank – 2% O Bank Draft/guarantee Issued By A Commercial Or Universal Bank – 2% O Bid Securing Declaration • Technical Specification • Production/delivery Schedule • Manpower Requirements • After-sales Service/parts, If Applicable • Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Checklist Of Financial Envelope Requirements For Bidders Ii.financial Component Envelope The Financial Component Shall Contain The Following: • Original Of Duly Signed And Accomplished Financial Bid Form; • Original Of Duly Signed And Accomplished Price Schedule(s). • Recurring And Maintenance Costs, If Applicable Other Documentary Requirements Under Ra No. 9184 (as Applicable) ⬜ (c) [for Foreign Bidders Claiming By Reason Of Their Country’s Extension Of Reciprocal Rights To Filipinos] Certification From The Relevant Government Office Of Their Country Stating That Filipinos Are Allowed To Participate In Government Procurement Activities For The Same Item Or Product. ⬜ (d) Certification From The Dti If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity.   Omnibus Sworn Statement(revised) Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g. Duly Notarized Secretary’s Certificate, Board/partnership Resolution Or Special Power Of Attorney, Whichever Is Applicable]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For And In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay, Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Of Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling(estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 Series Of 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This ___________ Day Of __________________, 2025 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me A Notary Public For And Within The Province/city Pf __________________, On This ________ Day Of _______________, 2025 At __________________________ By The Above Named Affiant With His/her __________________ As The Competent Evidence Of His/her Identity And Avows Under Penalty Of Law That All The Statements Contained On This Instrument Are True And Correct. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Republic Of The Philipppines ) City Of Sorsogon ) S.s. X ---------------------------------------------------x Bid Securing Declaration Project Identification No. ______ To: [insert Name And Address Of Procuring Entity] I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two(2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen(15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1(f) Of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid-securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am Declared Ineligible Or Post Disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And (c) I Am/we Declared As The Bidder With The Lowest Calculated And Responsive Bid And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I Have Hereunto Set My Hand This _____ Day Of ________, 2025 At __________________. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me A Notary Public For And Within The Province/city Pf __________________, On This ________ Day Of _______________, 2025 At __________________________ By The Above Named Affiant With His/her __________________ As The Competent Evidence Of His/her Identity And Avows Under Penalty Of Law That All The Statements Contained On This Instrument Are True And Correct. Doc. No. __________ Page No. __________ Book No. __________ Series Of 2025. Bid Form For The Procurement Of Goods (shall Be Submitted With The Bid) Bid Form Date: _____________________________ Project Identification No.: _____________ To: [name And Address Of Procuring Entity] Having Examined The Philippine Bidding Documents(pbds) Including The Supplemental Or Bid Bulletin Numbers_____, The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Offer To (supply/deliver/perform) (description Of The Goods) In Conformity With The Said Pbds For The Sum Of (total Bid Amount In Words And Figures) Or The Total Calculated Bid Price, As Evaluated And Corrected For Computational Errors , And Other Bid Modifications In Accordance With The Price Schedules Attached Herewith And Made Part Of This Bid. The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To (specify The Applicable Taxes, E.g. (i) Value Added Tax, (ii) Income Tax, (iii) Local Taxes, And (iv) Other Fiscal Levies And Duties), Which Are Itemized Herein Or In The Price Schedules. If Our Bid Is Accepted, We Undertake: A.to Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements Of The Philippine Bidding Documents(pbds); B. To Provide A Performance Security In The Form, Amounts, And Within The Times Prescribed In The Pbds; C. To Abide By The Bid Validity Specified In The Pbds And It Shall Remain Binding Upon Us At Any Time Before The Expiration Of That Period. Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And Your Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Bid You May Receive. We Certify/conform That We Comply With The Eligibility Requirements Pursuant To The Pbds. The Undersigned Is Authorized To Submit The Bid On Behalf Of (name Of The Bidder) As Evidenced By The Attached (state The Written Authority). We Acknowledge That Failure To Sugn Each And Every Page Of This Bid Form, Including, The Attached Schedule Of Prices, Shall Be A Ground For The Rejection Of Our Bid. Name: Legal Capacity: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Contract Agreement For The Procurement Of Goods(revised) __________________________________________________________________________ This Agreement, Made The _________ Day Of _______________, ________ Between [name And Address Of Procuring Entity] Of The Philippines (hereinafter Called The“entity”) Of The One Part And [name Of Supplier] (hereinafter Called The “supplier”) Of The Other Part. Whereas, The Entity Invited Bids For Certain Goods And Ancillary Services, Particularly (brief Description Of Goods And Services) And Has Accepted A Bid By The Supplier For The Supply Of Those Goods And Services In The Sum Of (contract Price In Words And Figures In Specified Currency) (hereinafter Called The “contract Price”). Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents As Required By The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 Shall Be Deemed To Form And Be Read And Construed As Part Of This Agreement, Viz.: I. Philippine Bidding Documents(pbds) I. Schedule Of Requirements; Ii.technical Specifications; Iii.bill Of Quantities Iv.general And Special Conditions Of Contract; V.supplemental Or Bid Bulletins, If Any Ii. Winning Bidder’s Bid, Including The Eligibility Requirements, Technical And Financial Proposals, And All Other Documents Or Statements Submitted; Bid Form, Including All The Documents/statements Submitted; Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes, And All Other Documents Submitted(e.g., Bidder’s Response To Request For Clarifications On The Bid), Including Corrections To The Bid, If Any, Resulting From The Procuring Entity’s Bid Evaluation; C. Performance Security D. Notice Of Award Of Contract And The Bidder’s Conforme Thereto; And E. Other Contract Documents That May Be Required By Existing Laws And/or The Procuring Entity Concerned In The Pbds. Winning Bidder Agrees That Additional Contract Documents Or Information Prescribed By The Gppb That Are Subsequently Required For Submission After The Contract Execution, Such As The Notice To Proceed, Variation Orders And Warranty Security, Shall Likewise Form Part Of The Contract. 3. In Consideration For The Sum Of [total Contract Price In Words And Figures) Or Such Other Sums As May Be Ascertained, [name Of Bidder] Agrees To Execute The [state The Object Of The Contract] In Accordance With His/her/its Bid. 4. The [name Of The Procuring Entity] To Pay The Above-mentioned Sum In Accordance With The Terms Of Bidding. In Witness, Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Binding Signature Of The Procuring Entity: Binding Signature Of Supplier: Insert Name And Signature] [insert Name And Signature] [insert Signatory’s Legal Capacity] [insert Signatory’s Legal Capacity] Signed In The Presence Of: ______________________ ________________ Liaison Officer For: For: [insert Procuring Entity] [insert Name Of Supplier] Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Contract Agreement And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. This Instrument Consists Of ____ Pages Including This Page On Which The Acknowledgement Is Written Duly Signed By The Contracting Parties And Their Witnesses. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Bill Of Quantities Item No. Item Quantity Unit Unit Price Total Price Prepared By: ______________ Proprietor
Closing Date10 Feb 2025
Tender AmountPHP 500 K (USD 8.6 K)

Department Of National Defence Tender

Others
Canada
Description: File Number: W8476-256986/a Notice Of Proposed Procurement The Department Of National Defence Has A Requirement For The Items Detailed Below. The Delivery Is Requested At 25cfsd Montreal And 7cfsd Edmonton By March 4th , 2025. Item 1, Gsin: 5325, Nsn: 5325 33 205 9306 Ring, Retaining P/n Requested: 2004780 Nscm/cage: 0848b Quantity: 30 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 2, Gsin: 5325, Nsn: 5325 33 205 9306 Ring, Retaining P/n Requested: 2004780 Nscm/cage: 0848b Quantity: 30 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 3, Gsin: 5360, Nsn: 5360 33 202 1304 Spring, Helical, Extension P/n Requested: 2007800 Nscm/cage / Cof/cage: 0848b Quantity: 30 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 4, Gsin: 5360, Nsn: 5360 33 202 1304 Spring, Helical, Extension P/n Requested: 2007800 Nscm/cage / Cof/cage: 0848b Quantity: 30 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 5, Gsin: 5330, Nsn: 5330 12 175 2642 Seal Plain P/n Requested: Babsl60x80x7/7,5-72nbr/902 Nscm/cage / Cof/cage: D2480 Quantity: 15 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 6, Gsin: 5330, Nsn: 5330 12 175 2642 Seal Plain P/n Requested: Babsl60x80x7/7,5-72nbr/902 Nscm/cage / Cof/cage: D2480 Quantity: 15 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 7, Gsin: 3110, Nsn: 3110 12 164 8047 Bearing, Roller, Tapered P/n Requested: 32009-xa Nscm/cage / Cof/cage: D2456 Quantity: 20 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 8, Gsin: 3110, Nsn: 3110 12 164 8047 Bearing, Roller, Tapered P/n Requested: 32009-xa Nscm/cage / Cof/cage: D2456 Quantity: 20 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 9, Gsin: 2530, Nsn: 2530 99 780 7800 Steering Wheel P/n Requested: 294745-003 Nscm/cage / Cof/cage: U1607 Quantity: 2 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 10, Gsin: 2530, Nsn: 2530 99 780 7800 Steering Wheel P/n Requested: 294745-003 Nscm/cage / Cof/cage: U1607 Quantity: 2 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 11, Gsin: 4730, Nsn: 4730 12 395 7588 Elbow, Tube P/n Requested: Wee10lromdcf Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 12, Gsin: 4730, Nsn: 4730 12 395 7588 Elbow, Tube P/n Requested: Wee10lromdcf Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 13, Gsin: 4730, Nsn: 4730 33 107 9371 Adapter, Straight, Tube To Boss P/n Requested: 4730700014 Nscm/cage / Cof/cage: 0125b Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 14, Gsin: 4730, Nsn: 4730 33 107 9371 Adapter, Straight, Tube To Boss P/n Requested: 4730700014 Nscm/cage / Cof/cage: 0125b Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 15, Gsin: 5330, Nsn: 5330 33 218 0038 Gasket P/n Requested: 4065545 Nscm/cage / Cof/cage: 0848b Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 16, Gsin: 5330, Nsn: 5330 33 218 0038 Gasket P/n Requested: 4065545 Nscm/cage / Cof/cage: 0848b Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 17, Gsin: 4730, Nsn: 4730 12 363 3125 Reducer, Tube P/n Requested: Red12/06zla3c Nscm/cage / Cof/cage: D8134 Quantity: 8 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 18, Gsin: 4730, Nsn: 4730 12 363 3125 Reducer, Tube P/n Requested: Red12/06zla3c Nscm/cage / Cof/cage: D8134 Quantity: 8 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 19, Gsin: 5330, Nsn: 5330 15 121 0511 Packing, Preformed P/n Requested: 5-612 N674-70 Nscm/cage / Cof/cage: A3958 Quantity: 25 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 20, Gsin: 5330, Nsn: 5330 15 121 0511 Packing, Preformed P/n Requested: 5-612 N674-70 Nscm/cage / Cof/cage: A3958 Quantity: 25 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 21, Gsin: 4730, Nsn: 4730 12 397 0740 Adapter, Straight, Tube To Boss P/n Requested: Ge12lr1/4cfx Nscm/cage / Cof/cage: D8134 Quantity: 12 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 22, Gsin: 4730, Nsn: 4730 12 397 0740 Adapter, Straight, Tube To Boss P/n Requested: Ge12lr1/4cfx Nscm/cage / Cof/cage: D8134 Quantity: 12 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 23, Gsin: 4820, Nsn: 4820 15 201 5924 Valve, Regulating, Fluid Pressure P/n Requested: Vcf35c B Viton Nscm/cage / Cof/cage: A4752 Quantity: 5 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 24, Gsin: 4820, Nsn: 4820 15 201 5924 Valve, Regulating, Fluid Pressure P/n Requested: Vcf35c B Viton Nscm/cage / Cof/cage: A4752 Quantity: 5 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 25, Gsin: 5930, Nsn: 5930 14 585 6465 Pedal Switch (foot) P/n Requested: Xpem110 Nscm/cage / Cof/cage: Fas02 Quantity: 5 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 26, Gsin: 5930, Nsn: 5930 14 585 6465 Pedal Switch (foot) P/n Requested: Xpem110 Nscm/cage / Cof/cage: Fas02 Quantity: 5 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 27, Gsin: 5930, Nsn: 5930 33 218 9773 Switch Thermostatic P/n Requested: 36030 Nscm/cage / Cof/cage: 1971b Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 28, Gsin: 5930, Nsn: 5930 33 218 9773 Switch Thermostatic P/n Requested: 36030 Nscm/cage / Cof/cage: 1971b Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 29, Gsin: 5820, Nsn: 5820 37 545 1937 Control-converter P/n Requested: Ddr-30g-24 Nscm/cage / Cof/cage: S8116 Quantity: 5 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 30, Gsin: 5820, Nsn: 5820 37 545 1937 Control-converter P/n Requested: Ddr-30g-24 Nscm/cage / Cof/cage: S8116 Quantity: 5 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 31, Gsin: 5920, Nsn: 5920 33 219 4072 Fuse Holder Extractor Post P/n Requested: P.616 Nscm/cage / Cof/cage: 8816b Quantity: 2 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 32, Gsin: 5920, Nsn: 5920 33 219 4072 Fuse Holder Extractor Post P/n Requested: P.616 Nscm/cage / Cof/cage: 8816b Quantity: 2 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 33, Gsin: 1680, Nsn: 1680 01 669 8259 Lever, Control P/n Requested: 1007185 Nscm/cage / Cof/cage: 7k7f9 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 34, Gsin: 1680, Nsn: 1680 01 669 8259 Lever, Control P/n Requested: 1007185 Nscm/cage / Cof/cage: 7k7f9 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 35, Gsin: 4730, Nsn: 4730 33 205 3376 Fitting, Lubrification P/n Requested: 2009319 Nscm/cage / Cof/cage: 0848b Quantity: 25 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 36, Gsin: 4730, Nsn: 4730 33 205 3376 Fitting, Lubrification P/n Requested: 2009319 Nscm/cage / Cof/cage: 0848b Quantity: 25 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 37, Gsin: 5306, Nsn: 5306 33 217 5746 Bolt, Internal Wrenching P/n Requested: 412396 16 Nscm/cage / Cof/cage: 551bb Quantity: 30 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 38, Gsin: 5306, Nsn: 5306 33 217 5746 Bolt, Internal Wrenching P/n Requested: 412396 16 Nscm/cage / Cof/cage: 551bb Quantity: 30 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 39, Gsin: 5325, Nsn: 5325 33 205 9306 Pin, Cotter P/n Requested: 0602254 Nscm/cage / Cof/cage: 0848b Quantity: 30 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 40, Gsin: 5325, Nsn: 5325 33 205 9306 Pin, Cotter P/n Requested: 0602254 Nscm/cage / Cof/cage: 0848b Quantity: 30 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 41, Gsin: 5305, Nsn: 5305 12 370 7996 Setscrew P/n Requested: Iso4026-m10x40-45h Nscm/cage / Cof/cage: I9008 Quantity: 30 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 42, Gsin: 5305, Nsn: 5305 12 370 7996 Setscrew P/n Requested: Iso4026-m10x40-45h Nscm/cage / Cof/cage: I9008 Quantity: 30 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 43, Gsin: 5310, Nsn: 5310 12 188 6493 Nut, Plain, Castellated, Hexagon P/n Requested: Din979-m24x1,5-05-znphrf Nscm/cage / Cof/cage: D8286 Quantity: 40 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 44, Gsin: 5310, Nsn: 5310 12 188 6493 Nut, Plain, Castellated, Hexagon P/n Requested: Din979-m24x1,5-05-znphrf Nscm/cage / Cof/cage: D8286 Quantity: 40 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 45, Gsin: 2530, Nsn: 2530 33 000 0734 Cap, Grease P/n Requested: 3499 Nscm/cage / Cof/cage: 1974b Quantity: 20 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 46, Gsin: 2530, Nsn: 2530 33 000 0734 Cap, Grease P/n Requested: 3499 Nscm/cage / Cof/cage: 1974b Quantity: 20 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 47, Gsin: 5310, Nsn: 5310 33 205 6966 Washer, Finishing P/n Requested: 0201969 Nscm/cage / Cof/cage: 0848b Quantity: 40 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 48, Gsin: 5310, Nsn: 5310 33 205 6966 Washer, Finishing P/n Requested: 0201969 Nscm/cage / Cof/cage: 0848b Quantity: 40 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 49, Gsin: 3120, Nsn: 3120 12 177 8991 Bearing, Washer, Thrust P/n Requested: Paw32p10 Nscm/cage / Cof/cage: D4871 Quantity: 20 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 50, Gsin: 3120, Nsn: 3120 12 177 8991 Bearing, Washer, Thrust P/n Requested: Paw32p10 Nscm/cage / Cof/cage: D4871 Quantity: 20 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 51, Gsin: 4320, Nsn: 4320 14 547 1429 Governor, Pump, Pressure Regulating P/n Requested: Olsa40152b0001 Nscm/cage / Cof/cage: F1606 Quantity: 5 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 52, Gsin: 4320, Nsn: 4320 14 547 1429 Governor, Pump, Pressure Regulating P/n Requested: Olsa40152b0001 Nscm/cage / Cof/cage: F1606 Quantity: 5 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 53, Gsin: 4730, Nsn: 4730 12 130 6681 Tee, Tube P/n Requested: T6l Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 54, Gsin: 4730, Nsn: 4730 12 130 6681 Tee, Tube P/n Requested: T6l Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 55, Gsin: 4730, Nsn: 4730 12 185 2661 Tee Tube P/n Requested: Evl6l0md Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 56, Gsin: 4730, Nsn: 4730 12 185 2661 Tee Tube P/n Requested: Evl6l0md Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 57, Gsin: 4730, Nsn: 4730 12 375 7616 Adapter, Straight, Tube To Boss P/n Requested: Ge10lredomdcf Nscm/cage / Cof/cage: D8134 Quantity: 25 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 58, Gsin: 4730, Nsn: 4730 12 375 7616 Adapter, Straight, Tube To Boss P/n Requested: Ge10lredomdcf Nscm/cage / Cof/cage: D8134 Quantity: 25 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 59, Gsin: 4730, Nsn: 4730 12 383 8749 Adapter, Straight, Tube To Boss P/n Requested: Ge06lredomdcf Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 60, Gsin: 4730, Nsn: 4730 12 383 8749 Adapter, Straight, Tube To Boss P/n Requested: Ge06lredomdcf Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 61, Gsin: 4730, Nsn: 4730 01 692 0371 Tee, Tube P/n Requested: Wh10lromdcf Nscm/cage / Cof/cage: 30780 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 62, Gsin: 4730, Nsn: 4730 01 692 0371 Tee, Tube P/n Requested: Wh10lromdcf Nscm/cage / Cof/cage: 30780 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 63, Gsin: 4730, Nsn: 4730 14 446 4289 Adapter, Straight, Tube To Boss P/n Requested: Ri1x1/2 Nscm/cage / Cof/cage: F0271 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 64, Gsin: 4730, Nsn: 4730 14 446 4289 Adapter, Straight, Tube To Boss P/n Requested: Ri1x1/2 Nscm/cage / Cof/cage: F0271 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 65, Gsin: 4730, Nsn: 4730 12 131 3965 Nipple, Tube P/n Requested: G10l Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 66, Gsin: 4730, Nsn: 4730 12 131 3965 Nipple, Tube P/n Requested: G10l Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 67, Gsin: 4730, Nsn: 4730 12 143 0160 Elbow Tube P/n Requested: Wsv15l Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 68, Gsin: 4730, Nsn: 4730 12 143 0160 Elbow Tube P/n Requested: Wsv15l Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 69, Gsin: 4730, Nsn: 4730 01 556 0240 Union, Tube P/n Requested: Sv10lomdcf Nscm/cage / Cof/cage: 30780 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 70, Gsin: 4730, Nsn: 4730 01 556 0240 Union, Tube P/n Requested: Sv10lomdcf Nscm/cage / Cof/cage: 30780 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 71, Gsin: 4730, Nsn: 4730 12 383 0939 Adapter, Straight, Tube To Boss P/n Requested: Sv12lomdcf Nscm/cage / Cof/cage: D8134 Quantity: 8 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 72, Gsin: 4730, Nsn: 4730 12 383 0939 Adapter, Straight, Tube To Boss P/n Requested: Sv12lomdcf Nscm/cage / Cof/cage: D8134 Quantity: 8 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 73, Gsin: 4730, Nsn: 4730 12 182 3200 Adapter, Straight, Tube To Boss P/n Requested: Evge12lred Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 74, Gsin: 4730, Nsn: 4730 12 182 3200 Adapter, Straight, Tube To Boss P/n Requested: Evge12lred Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 75, Gsin: 4730, Nsn: 4730 12 371 3068 Elbow, Tube P/n Requested: Ew12lomdcf Nscm/cage / Cof/cage: D8134 Quantity: 12 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 76, Gsin: 4730, Nsn: 4730 12 371 3068 Elbow, Tube P/n Requested: Ew12lomdcf Nscm/cage / Cof/cage: D8134 Quantity: 12 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 77, Gsin: 4730, Nsn: 4730 14 566 4961 Adapter, Straight, Tube To Boss P/n Requested: Ege10lredcf Nscm/cage / Cof/cage: Faqb2 Quantity: 12 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 78, Gsin: 4730, Nsn: 4730 14 566 4961 Adapter, Straight, Tube To Boss P/n Requested: Ege10lredcf Nscm/cage / Cof/cage: Faqb2 Quantity: 12 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 79, Gsin: 4730, Nsn: 4730 14 563 7624 Coupling Tube P/n Requested: Gz12lcf Nscm/cage / Cof/cage: C5018 Quantity: 8 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 80, Gsin: 4730, Nsn: 4730 14 563 7624 Coupling Tube P/n Requested: Gz12lcf Nscm/cage / Cof/cage: C5018 Quantity: 8 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 81, Gsin: 4730, Nsn: 4730 14 553 1150 Adapter, Straight, Tube To Boss P/n Requested: Ge12lr1-2edomdcf Nscm/cage / Cof/cage: Faqb2 Quantity: 12 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 82, Gsin: 4730, Nsn: 4730 14 553 1150 Adapter, Straight, Tube To Boss P/n Requested: Ge12lr1-2edomdcf Nscm/cage / Cof/cage: Faqb2 Quantity: 12 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 83, Gsin: 4730, Nsn: 4730 12 145 5655 Adapter, Straight, Tube To Boss P/n Requested: Ri3/4x3/8 Nscm/cage / Cof/cage: D8134 Quantity: 8 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 84, Gsin: 4730, Nsn: 4730 12 145 5655 Adapter, Straight, Tube To Boss P/n Requested: Ri3/4x3/8 Nscm/cage / Cof/cage: D8134 Quantity: 8 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 85, Gsin: 4730, Nsn: 4730 12 145 4376 Nipple, Tube P/n Requested: Sv6l Nscm/cage / Cof/cage: D8134 Quantity: 12 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 86, Gsin: 4730, Nsn: 4730 12 145 4376 Nipple, Tube P/n Requested: Sv6l Nscm/cage / Cof/cage: D8134 Quantity: 12 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 87, Gsin: 4730, Nsn: 4730 12 375 7584 Tee, Tube P/n Requested: T10lcfx Nscm/cage / Cof/cage: D8134 Quantity: 8 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 88, Gsin: 4730, Nsn: 4730 12 375 7584 Tee, Tube P/n Requested: T10lcfx Nscm/cage / Cof/cage: D8134 Quantity: 8 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 89, Gsin: 4310, Nsn: 4310 33 211 7744 Diaphragm, Pump, Special Shaped P/n Requested: 4008308 Nscm/cage / Cof/cage: 0848b Quantity: 3 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 90, Gsin: 4310, Nsn: 4310 33 211 7744 Diaphragm, Pump, Special Shaped P/n Requested: 4008308 Nscm/cage / Cof/cage: 0848b Quantity: 3 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 91, Gsin: 5930, Nsn: 5930 12 374 3592 Switch, Pressure P/n Requested: Pk6522 Nscm/cage / Cof/cage: C2241 Quantity: 5 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 92, Gsin: 5930, Nsn: 5930 12 374 3592 Switch, Pressure P/n Requested: Pk6522 Nscm/cage / Cof/cage: C2241 Quantity: 5 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 93, Gsin: 6350, Nsn: 6350 12 408 3672 Horn, Signal P/n Requested: 3al002952-811 Nscm/cage / Cof/cage: C6222 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 94, Gsin: 6350, Nsn: 6350 12 408 3672 Horn, Signal P/n Requested: 3al002952-811 Nscm/cage / Cof/cage: C6222 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 95, Gsin: 5925, Nsn: 5925 14 578 5902 Circuit Breaker P/n Requested: A9f94325 Nscm/cage / Cof/cage: Fas02 Quantity: 5 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 96, Gsin: 5925, Nsn: 5925 14 578 5902 Circuit Breaker P/n Requested: A9f94325 Nscm/cage / Cof/cage: Fas02 Quantity: 5 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 97, Gsin: 2920, Nsn: 2920 33 107 4046 Switch, Lock, Ignition P/n Requested: 40130 Nscm/cage / Cof/cage: 1971b Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 98, Gsin: 2920, Nsn: 2920 33 107 4046 Switch, Lock, Ignition P/n Requested: 40130 Nscm/cage / Cof/cage: 1971b Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 99, Gsin: 5945, Nsn: 5945 33 204 7493 Retainer Electrical Relay P/n Requested: 3032294 Nscm/cage / Cof/cage: 0848b Quantity: 5 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 100, Gsin: 5945, Nsn: 5945 33 204 7493 Retainer Electrical Relay P/n Requested: 3032294 Nscm/cage / Cof/cage: 0848b Quantity: 5 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 101, Gsin: 5999, Nsn: 5999 99 225 5376 Contact, Electrical P/n Requested: Zbe-101 Nscm/cage / Cof/cage: K1674 Quantity: 8 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 102, Gsin: 5999, Nsn: 5999 99 225 5376 Contact, Electrical P/n Requested: Zbe-101 Nscm/cage / Cof/cage: K1674 Quantity: 8 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 103, Gsin: 5999, Nsn: 5999 01 548 3551 Block-assembly P/n Requested: Zb4bz101 Nscm/cage / Cof/cage: 3wag4 Quantity: 8 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 104, Gsin: 5999, Nsn: 5999 01 548 3551 Block-assembly P/n Requested: Zb4bz101 Nscm/cage / Cof/cage: 3wag4 Quantity: 8 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 105, Gsin: 6210, Nsn: 6210 14 596 0263 Light, Indicator P/n Requested: Zb4bvj4 Nscm/cage / Cof/cage: Fas02 Quantity: 8 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 106, Gsin: 6210, Nsn: 6210 14 596 0263 Light, Indicator P/n Requested: Zb4bvj4 Nscm/cage / Cof/cage: Fas02 Quantity: 8 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 107, Gsin: 5895, Nsn: 5895 01 690 4142 Joystick, Data Entry P/n Requested: Xd4pa22 Nscm/cage / Cof/cage: 56365 Quantity: 12 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 108, Gsin: 5895, Nsn: 5895 01 690 4142 Joystick, Data Entry P/n Requested: Xd4pa22 Nscm/cage / Cof/cage: 56365 Quantity: 12 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 109, Gsin: 5895, Nsn: 5895 33 212 1970 Joystick, Data Entry P/n Requested: 6065089 Nscm/cage / Cof/cage: 0848b Quantity: 9 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 110, Gsin: 5895, Nsn: 5895 33 212 1970 Joystick, Data Entry P/n Requested: 6065089 Nscm/cage / Cof/cage: 0848b Quantity: 9 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 111, Gsin: 5930, Nsn: 5930 01 483 8558 Switch, Push P/n Requested: Zbe-102 Nscm/cage / Cof/cage: 51917 Quantity: 8 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 112, Gsin: 5930, Nsn: 5930 01 483 8558 Switch, Push P/n Requested: Zbe-102 Nscm/cage / Cof/cage: 51917 Quantity: 8 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 113, Gsin: 5975, Nsn: 5975 12 407 4752 Locknut, Electrical Conduit P/n Requested: Gmm216/7pa Nscm/cage / Cof/cage: D1129 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 114, Gsin: 5975, Nsn: 5975 12 407 4752 Locknut, Electrical Conduit P/n Requested: Gmm216/7pa Nscm/cage / Cof/cage: D1129 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 115, Gsin: 3120, Nsn: 3120 14 501 0474 Bearing, Sleeve P/n Requested: Paf 40260 P10 Nscm/cage / Cof/cage: F0563 Quantity: 20 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 116, Gsin: 3120, Nsn: 3120 14 501 0474 Bearing, Sleeve P/n Requested: Paf 40260 P10 Nscm/cage / Cof/cage: F0563 Quantity: 20 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 117, Gsin: 5305, Nsn: 5305 33 204 7454 Hexagonal Screw P/n Requested: 0464246 Nscm/cage / Cof/cage: 0848b Quantity: 50 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 118, Gsin: 5305, Nsn: 5305 33 204 7454 Hexagonal Screw P/n Requested: 0464246 Nscm/cage / Cof/cage: 0848b Quantity: 50 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 119, Gsin: 5365, Nsn: 5365 33 207 7402 Spacer, Ring P/n Requested: 5002448 Nscm/cage / Cof/cage: 0848b Quantity: 30 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 120, Gsin: 5365, Nsn: 5365 33 207 7402 Spacer, Ring P/n Requested: 5002448 Nscm/cage / Cof/cage: 0848b Quantity: 30 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 121, Gsin: 3120, Nsn: 3120 12 174 9457 Bearing Sleeve P/n Requested: Pap1015p10 Nscm/cage / Cof/cage: D8092 Quantity: 20 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 122, Gsin: 3120, Nsn: 3120 12 174 9457 Bearing Sleeve P/n Requested: Pap1015p10 Nscm/cage / Cof/cage: D8092 Quantity: 20 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 123, Gsin: 5331, Nsn: 5331 12 389 2854 O-ring P/n Requested: V1 2394 P5008 Nscm/cage / Cof/cage: D1333 Quantity: 15 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 124, Gsin: 5331, Nsn: 5331 12 389 2854 O-ring P/n Requested: V1 2394 P5008 Nscm/cage / Cof/cage: D1333 Quantity: 15 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 125, Gsin: 3110, Nsn: 3110 12 145 5232 Bearing, Ball, Annular P/n Requested: 6002-2rsr Nscm/cage / Cof/cage: Cm647 Quantity: 20 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 126, Gsin: 3110, Nsn: 3110 12 145 5232 Bearing, Ball, Annular P/n Requested: 6002-2rsr Nscm/cage / Cof/cage: Cm647 Quantity: 20 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 127, Gsin: 5340, Nsn: 5340 43 001 2428 Catch, Clamping P/n Requested: Zb-06 Nscm/cage / Cof/cage: 1983h Quantity: 7 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 128, Gsin: 5340, Nsn: 5340 43 001 2428 Catch, Clamping P/n Requested: Zb-06 Nscm/cage / Cof/cage: 1983h Quantity: 7 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 129, Gsin: 9390, Nsn: 9390 12 383 9036 Nonmetalic Special Shaped Section P/n Requested: 209-0206 Nscm/cage / Cof/cage: D4291 Quantity: 30 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 130, Gsin: 9390, Nsn: 9390 12 383 9036 Nonmetalic Special Shaped Section P/n Requested: 209-0206 Nscm/cage / Cof/cage: D4291 Quantity: 30 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 131, Gsin: 4730, Nsn: 4730 14 553 1089 Adapter, Straight, Pipe To Tube P/n Requested: Ge06lr1-4edomdcf Nscm/cage / Cof/cage: Faqb2 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 132, Gsin: 4730, Nsn: 4730 14 553 1089 Adapter, Straight, Pipe To Tube P/n Requested: Ge06lr1-4edomdcf Nscm/cage / Cof/cage: Faqb2 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Bidders Proposing An Equivalent Or A Substitute Product Must Indicate The Brand Name And Model And/or Part Number And The Nscm/cage They Are Offering. The Crown Retains The Rights To Negotiate With Suppliers On Any Procurement. Documents May Be Submitted In Either Official Language Of Canada. Debriefings: Bidders May Request A Debriefing On The Results Of The Bid Solicitation Process. Bidders Should Make The Request To The Contracting Authority Within Fifteen (15) Working Days From Receipt Of The Results Of The Bid Solicitation Process. The Debriefing May Be Provided In Writing, By Telephone Or In Person. Electronic Submission Of Bids: This Requirement Uses Electronic Receipt Of Bids By E-mail Only. For Details, Please Review The Section Entitled Electronic Submission Of Bids In The Solicitation Document. Bids Must Be Submitted By E-mail Only To: Dlp53bidsreceiving.daat53receptiondessoumissions@forces.gc.ca
Closing Date9 Jan 2025
Tender AmountRefer Documents 
6561-6570 of 6585 archived Tenders