Fencing Tenders
Fencing Tenders
Offizielle Bezeichnung Landesbetrieb Bau Und Immobilien Hessen Niederlassung Mitte Zentrale Vergabe Tender
Civil And Construction...+1Others
Germany
Description: Public tender Vob/a Demolition and dismantling work (din 18 459); Floor covering work (din 18 365); Screed work (din 18 353); Tiling and panel work (din 18 352); Scaffolding work (din 18 451); Painting and varnishing work - coatings (din 18 363); Bricklaying (din 18 330); Plastering and stucco work (din 18 350); Wallpapering (din 18 366); Drywall work (din 18 340); Carpentry and timber construction work (DIN 18 334); Demolition and dismantling work (DIN 18 459); Construction site equipment: Construction site equipment including mobile crane 1 piece; Construction fence, wire mesh with privacy net 250 m; Construction road + container parking areas, mineral mixture 200 m²; Lawn finishing care 350 m²; Work protection: 1-chamber lock 12 pieces; Partitioning, fiber-tight and stable 250 m²; Material airlock and personnel airlock; Scaffolding work: Facade/roof scaffolding, 2 kN/m², W06 2300 m²; Provision for scaffolding 78200 m²wo; Dismantling of contaminated building materials: Demolition of asbestos cement ventilation ducts 12 pieces; Demolition of asbestos-containing flexible panels + adhesive 215 m²; Demolition of KMF impact sound insulation, D=15mm 1250 m²; Demolition of PK-containing release paper 1100 m²; Demolition work: Demolition of tiles 750 m²; Demolition of PVC floor covering 900 m²; Demolition of cement screed 360 m²; Demolition of interior wall plaster 4200 m²; Demolition of ceiling plaster + reed mats 1590 m²; Demolition of interior doors + frames 95 pcs.; Shell work: Making / widening door openings 31 pcs.; Making masonry pillars 19 pcs.; Making foundations for external staircase 1 m³; Core drilling 138 pcs.; Roofing work: Installing line ventilators in interlocking tile roof 15 pcs.; Sun protection: Venetian blinds for windows 98 pcs.; Locksmith: External staircase 1 pc.; Adjusting balcony railings 15 pcs.; plastering work: lime cement ceiling plaster 462 m²; gypsum ceiling plaster 1250 m²; lime cement wall plaster 152 m²; gypsum wall plaster 1670 m²; screed work: quick cement screed, D= 40-45 mm 1230 m²; floor covering work: linoleum covering 1160 m²; drywall work: dry screed/rock wool insulation panels D= 100 mm 609 m²; plasterboard assembly walls 469 m²; plasterboard installation walls 116 m²; plasterboard sub-ceiling 832 m²; plasterboard suspended ceiling 340 m²; tiling and natural stone work: floor tiles 84 m²; wall tiles 53 m²; carpentry work: tea kitchens 2 pcs.; interior doors office doors 23 pcs.; Damp room doors 14 pieces; metalwork: aluminum frame doors 16 pieces; sheet steel doors including frames 11 pieces; painting work: glass fabric wallpaper + emulsion paint walls 2800 m²; coating suspended plasterboard ceilings 1171 m²; coating steel perimeter frames 44 pieces; coating sheet steel doors with frames 10 pieces; overhaul coatings walls + ceilings 940 m²; industrial floor coating epoxy resin 290 m²; building cleaning work: intermediate and final cleaning 1600 m²; locking system: BKS profile double cylinder 49 pieces; digital double knob cylinder 27 pieces; transponder 100 pieces; panic lock 34 pieces; access control smart relay 11 pieces, programming device + locking plan creation HLS + building automation: -1. And 2nd floor (the ground floor was already prepared in 2018): Dismantling of the complete sanitary installation from the equipment standard for apartments and equipping the building with sanitary facilities for an office building, consisting of dismantling 31 hand basins, 21 toilets/urinals, 12 shower trays and 6 bathtubs with vanity units, shower partitions and small parts, equipping the new toilet areas with 9 hand basins, 11 toilets, 2 urinals, 1 shower tray, 2 sinks, each with support frames, instantaneous water heaters and sanitary accessories and installations for two kitchen sinks, 150 m of PP+SML waste water pipes, 200 m of stainless steel drinking water pipes with press connections and thermal insulation, 16 fire extinguishers with wall boxes, dry riser with three feed-in and 15 extraction points with pipes. -approx. 40 new radiators with approx. 180 m of C-steel pipes. -12 fans for toilet exhaust air in accordance with DIN 18017-3 and one for battery room exhaust air with PPS pipes, four split air conditioning units. -Approx. 350 sprinkler heads, approx. 500 m of sprinkler pipes for a wet and a dry system, sprinkler distributor, a sprinkler station, nitrogen generator. -Building automation with simple monitoring tasks. Electrics: Installation cable NYM-J 3x2.5 mm² various. Installation types approx. 6,000 m, installation cable Nym-j 3x1.5 mm² approx. 3,500 m, cable halogen-free Nhxhx-j-fe180 up to 3x2.5 mm² approx. 2,000 m, installation cable E 30 up to 4x2x0.8 mm approx. 2,300 m, installation distributor 230 VI 250 A indoor installation wall mounting 8 pieces, circuit breaker 1-pole character b 16a 250 pieces, cable tray perforated steel strip galvanized H 60mm W up to 600 mm approx. 300 m, electrical installation duct device installation H/w 60/130mm plastic approx. 650 m, Bap-LED surface-mounted light 35W approx. 154 pieces, LED recessed downlight D=235mm, 16 W approx. 65 pcs., LED safety lights approx. 65 pcs., LED escape sign lights approx. 40 pcs., BMA signal generator optical flashing light approx. 100 pcs., loudspeaker for wall and ceiling mounting up to 2x6 W approx. 110 pcs., data cable Cat. 6a various installation types approx. 12,000 m, data connection box sym. Cat. 6a 2 ports approx. 170 pcs.
Closing Date31 Jan 2025
Tender AmountRefer Documents
Offizielle Bezeichnung Landesbetrieb Bau Und Immobilien Hessen Niederlassung Mitte Zentrale Vergabe Tender
Civil And Construction...+1Others
Germany
Description: Public tender Vob/a Demolition and dismantling work (din 18 459); Floor covering work (din 18 365); Screed work (din 18 353); Tiling and panel work (din 18 352); Scaffolding work (din 18 451); Painting and varnishing work - coatings (din 18 363); Bricklaying (din 18 330); Plastering and stucco work (din 18 350); Wallpapering (din 18 366); Drywall work (din 18 340); Carpentry and timber construction work (DIN 18 334); Demolition and dismantling work (DIN 18 459); Construction site equipment: Construction site equipment including mobile crane 1 piece; Construction fence, wire mesh with privacy net 250 m; Construction road + container parking areas, mineral mixture 200 m²; Lawn finishing care 350 m²; Work protection: 1-chamber lock 12 pieces; Partitioning, fiber-tight and stable 250 m²; Material airlock and personnel airlock; Scaffolding work: Facade/roof scaffolding, 2 kN/m², W06 2300 m²; Provision for scaffolding 78200 m²wo; Dismantling of contaminated building materials: Demolition of asbestos cement ventilation ducts 12 pieces; Demolition of asbestos-containing flexible panels + adhesive 215 m²; Demolition of KMF impact sound insulation, D=15mm 1250 m²; Demolition of PK-containing release paper 1100 m²; Demolition work: Demolition of tiles 750 m²; Demolition of PVC floor covering 900 m²; Demolition of cement screed 360 m²; Demolition of interior wall plaster 4200 m²; Demolition of ceiling plaster + reed mats 1590 m²; Demolition of interior doors + frames 95 pcs.; Shell work: Making / widening door openings 31 pcs.; Making masonry pillars 19 pcs.; Making foundations for external staircase 1 m³; Core drilling 138 pcs.; Roofing work: Installing line ventilators in interlocking tile roof 15 pcs.; Sun protection: Venetian blinds for windows 98 pcs.; Locksmith: External staircase 1 pc.; Adjusting balcony railings 15 pcs.; plastering work: lime cement ceiling plaster 462 m²; gypsum ceiling plaster 1250 m²; lime cement wall plaster 152 m²; gypsum wall plaster 1670 m²; screed work: quick cement screed, D= 40-45 mm 1230 m²; floor covering work: linoleum covering 1160 m²; drywall work: dry screed/rock wool insulation panels D= 100 mm 609 m²; plasterboard assembly walls 469 m²; plasterboard installation walls 116 m²; plasterboard sub-ceiling 832 m²; plasterboard suspended ceiling 340 m²; tiling and natural stone work: floor tiles 84 m²; wall tiles 53 m²; carpentry work: tea kitchens 2 pcs.; interior doors office doors 23 pcs.; Damp room doors 14 pieces; metalwork: aluminum frame doors 16 pieces; sheet steel doors including frames 11 pieces; painting work: glass fabric wallpaper + emulsion paint walls 2800 m²; coating suspended plasterboard ceilings 1171 m²; coating steel perimeter frames 44 pieces; coating sheet steel doors with frames 10 pieces; overhaul coatings walls + ceilings 940 m²; industrial floor coating epoxy resin 290 m²; building cleaning work: intermediate and final cleaning 1600 m²; locking system: BKS profile double cylinder 49 pieces; digital double knob cylinder 27 pieces; transponder 100 pieces; panic lock 34 pieces; access control smart relay 11 pieces, programming device + locking plan creation HLS + building automation: -1. And 2nd floor (the ground floor was already prepared in 2018): Dismantling of the complete sanitary installation from the equipment standard for apartments and equipping the building with sanitary facilities for an office building, consisting of dismantling 31 hand basins, 21 toilets/urinals, 12 shower trays and 6 bathtubs with vanity units, shower partitions and small parts, equipping the new toilet areas with 9 hand basins, 11 toilets, 2 urinals, 1 shower tray, 2 sinks, each with support frames, instantaneous water heaters and sanitary accessories and installations for two kitchen sinks, 150 m of PP+SML waste water pipes, 200 m of stainless steel drinking water pipes with press connections and thermal insulation, 16 fire extinguishers with wall boxes, dry riser with three feed-in and 15 extraction points with pipes. -approx. 40 new radiators with approx. 180 m of C-steel pipes. -12 fans for toilet exhaust air in accordance with DIN 18017-3 and one for battery room exhaust air with PPS pipes, four split air conditioning units. -Approx. 350 sprinkler heads, approx. 500 m of sprinkler pipes for a wet and a dry system, sprinkler distributor, a sprinkler station, nitrogen generator. -Building automation with simple monitoring tasks. Electrics: Installation cable NYM-J 3x2.5 mm² various. Installation types approx. 6,000 m, installation cable Nym-j 3x1.5 mm² approx. 3,500 m, cable halogen-free Nhxhx-j-fe180 up to 3x2.5 mm² approx. 2,000 m, installation cable E 30 up to 4x2x0.8 mm approx. 2,300 m, installation distributor 230 VI 250 A indoor installation wall mounting 8 pieces, circuit breaker 1-pole character b 16a 250 pieces, cable tray perforated steel strip galvanized H 60mm W up to 600 mm approx. 300 m, electrical installation duct device installation H/w 60/130mm plastic approx. 650 m, Bap-LED surface-mounted light 35W approx. 154 pieces, LED recessed downlight D=235mm, 16 W approx. 65 pcs., LED safety lights approx. 65 pcs., LED escape sign lights approx. 40 pcs., BMA signal generator optical flashing light approx. 100 pcs., loudspeaker for wall and ceiling mounting up to 2x6 W approx. 110 pcs., data cable Cat. 6a various installation types approx. 12,000 m, data connection box sym. Cat. 6a 2 ports approx. 170 pcs.
Closing Date31 Jan 2025
Tender AmountRefer Documents
The Town Of Senomaty Tender
Chemical Products
Czech Republic
Details: The subject of performance is the preparation of single-stage (combined) project documentation for the issuance of a joint permit in the scope and details of the documentation for the execution of construction (dps), which will be based on the study, which is an annex to the procurement documentation. The subject of the project is the demolition of the existing building and the construction of a new multi-purpose building. On the first floor, there are facilities for the school canteen and the school kitchen, storage areas and a hairdresser's area. The second floor is intended for four residential units with a basement. The study is processed by Ing. Sheet. Markéta Bromová, Čka 04034. The place of construction is Parcel Number St. 310 V K.ú. Senomats. The current School Canteen Building That Now Stands On The Site Will Be Removed. The subject of the Dps Project is also the Necessary Surrounding Paved Area (parking lot, access walkways) and Gastro Equipment of the School Canteen. The subject of the project is not fencing and leisure space in front of the building. The estimated investment costs of the construction itself is approx. 40 million. CZK.
Closing Date20 Jan 2025
Tender AmountCZK 1.3 Million (USD 53.6 K)
Department Of Agriculture Tender
Civil And Construction...+1Building Construction
Philippines
Details: Description Invitation To Bid For The Rebidding Of Provision Of Labor, Materials, Equipment Rental And Other Incidentals Needed For The Construction Of Livestock Housing Facility (beef Cattle) In Region 1 1. The Department Of Agriculture - Regional Field Office 1 (da-rfo 1), Through The National Expenditure Program Fy 2025 Intends To Apply The Sum Of One Million Pesos (php1,000,000.00) Being The Approved Budget For The Contract (abc) To Payment Under The Contract For The Rebidding Of Provision Of Labor, Materials, Equipment Rental And Other Incidentals Needed For The Construction Of Livestock Housing Facility (beef Cattle) In Region 1 With Project Identification Number Da Rfo-1-2025-infra-001-r. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Da-rfo 1 Now Invites Bids For The Early Procurement Activity (epa) Of The Above Procurement Project, In Accordance With The Provisions Under Appendix 31 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184 For The Above-mentioned Procurement Project With The Following Details And Specifications, To Wit: Details And Specifications Project Site/location: Brgy. Calunetan, Sison, Pangasinan Project Description: Construction Of 135 Sq.m. Cattle House With Loafing Area, Feeding Through, Chute And Perimeter Fence Scope Of Work: Description Qty Unit I. General Requirements (permits & Project Billboard) 1.00 Lot Ii. Mobilization And Demobilization 1.00 Lot Iii. Safety And Health 1.00 Lot Iv. Earthworks 37.00 Cu.m. V. Rsb Works 1,163.00 Kgs. Vi. Form Works And Scaffoldings 600.00 Bd.ft. Vii. Concrete Works (class A) 30.00 Cu.m. Viii. Masonry Works (including Plastering) 28.00 Sq.m. Ix. Steel Works 1.00 Lot X. Tinsmithry Works 186.00 Sq.m. Xi. Painting Works 1.00 Lot Xii. Electrical Works 1.00 Lot Minimum Technical Personnel Required: • 1 Project Engineer • 1 Foreman • 6 Skilled Workers • 8 Unskilled Workers Minimum Equipment Required: • 1 One-bagger Mixer • Minor Tools Completion Of The Works Is Within Seventy (70) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Seventy-five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Prospective Bidders May Obtain Further Information From And Inspect The Bidding Documents At The Address Given Below During Office Hours At 8:00 Am To 5:00 Pm, Monday To Friday. Department Of Agriculture - Regional Field Office 1 Aguila Rd., Sevilla, City Of San Fernando, La Union 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From December 13, 2024 To January 7, 2025 From The Address Given And Websites Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php1,000.00. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. 6. The Da-rfo 1 Will Hold A Pre-bid Conference On 20 December 2024, 3:00 Pm At Da-rfo 1, 5th Floor Conference Room, Aguila Road, Sevilla, City Of San Fernando, La Union, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Above On Or Before 07 January 2025, 2:00 Pm. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On 07 January 2025, 2:00 Pm At Da-rfo 1, 5th Floor Conference Room, Aguila Road, Sevilla, City Of San Fernando, La Union. Bids Will Be Opened In The Presence Of The Bidders Or Their Authorized Representatives. 10. Additional Instructions To Bidders: A. The Bidders Or Their Duly Authorized Representatives May Attend The Bid Opening; B. In Case A Representative Will Be Attending The Bid Opening, A Special Power Of Attorney (spa), Secretary’s Certificate, Board Resolution Or Any Other Forms Of Authorization (notarized), As The Case May Be, Together With The Company-issued Identification Card Or Any Valid Id Must Be Presented Upon Submission Of The Bid Proposal At The Bac Secretariat. The Name/title Of The Project Must Be Indicated In The Authorization Or Spa; C. Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. Bidders Shall Submit Their Bids With Proper Index Tabbing Using The Forms Specified In The Bidding Documents In Two (2) Separate Sealed Bid Envelopes, And Which Shall Be Submitted Simultaneously; The First Component Which Is The Technical Eligibility Requirements Must Be Soft-bound, Marked With The Name Of The Contract And Its Ib No., Name And Address Of The Bidder, And Enclosed In An Envelope, Sealed With Signature And Marked With The Name Of The Contract, Name And Address Of The Bidder, Addressed To The Bids And Awards Committee (bac) Da Rfo-1 City Of San Fernando, La Union, The Specific Identification No. And The Warning “do Not Open Before…” The Date And Time For The Bid Opening. The Second Component Being The Financial Requirements May Be Soft-bound/fastened In A Folder, Marked With The Name Of The Contract And Its Ib No., Name And Address Of The Bidder, And Enclosed In An Envelope, Sealed With Signature And Marked With The Name Of The Contract, Name And Address Of The Bidder, Addressed To The Bids And Awards Committee (bac) Da Rfo-1 City Of San Fernando, La Union, The Specific Identification No. And The Warning “do Not Open Before…” The Date And Time For The Bid Opening. The Technical And Financial Requirement Each In Separate Envelopes, Shall Be Enclosed In A Mother Envelope With The Same Sealing And Markings. Non-compliance With Index Tabbings Shall Not Be A Ground For Outright Disqualification Or Declaration Of Ineligibility. The Improper Index Tabbings Must Be Duly Acknowledged By The Bidder/representative And Be Subject To The Bid Evaluation And Post-qualification Of The Technical Working Group (twg) As To Their Substance. D. All Documents In The Financial Requirements Envelope Must Be Duly Signed And/or Initialed, As Needed, By The Bidder/authorized Representative On Each And Every Page Thereof. E. The Award Of Contract For Procurement Projects Undertaken Through Epa May Be Made Only Upon The Following Conditions And Shall Be In Accordance With Item 7 Of Appendix 31 Of The 2016 Revised Irr Of Ra 9184: E.1. Approval And Effectivity Of The Funding Sources, To Wit: (i) General Appropriations Act; (ii) Corporate Budget; (iii) Appropriations Ordinance; Or (iv) Loan Agreement In The Case Of Faps; Or E.2. The Reenactment Of The Previous Year’s Budget Which Constitutes The Current Year’s Authorized Budget, When Authorized By The Constitution, Law Or Rules. 11. The Da-rfo 1 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And Section 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Dennis I. Tactac, Abe Chairperson, Bids And Awards Committee Department Of Agriculture - Regional Field Office 1 Aguila Road, Sevilla, City Of San Fernando, La Union Tel. No.:(072) 242/1045-46, Ext. 07 E-mail Add: Bacsec@ilocos.da.gov.ph 13. For Downloading Of Bidding Documents, You May Visit The Following Websites: Da-rfo1 Website: Https://ilocos.da.gov.ph/ Philgeps Website: Https://www.philgeps.gov.ph/ December 12, 2024 Approved By: (sgd.) Gilbert D. Rabara, Dvm Vice-chairperson, Bids And Awards Committee Invitation To Bid Identification No. Da-rfo 1-2025-infra-001-r
Closing Date7 Jan 2025
Tender AmountPHP 1 Million (USD 16.9 K)
Stadt K Nigs Wusterhausen, Dezernat Zentrale Dienste Und Finanzen, Amt Verwaltungsmanagement, Sachgebiet Vergabe Vertragsmanagement Tender
Civil And Construction...+1Civil Works Others
Germany
Details: The town of Königs Wusterhausen intends to award the construction work in the construction project "conversion of bus stops with crossing aid and car park Niederlehmer Chaussee L30" in 15713 Königs Wusterhausen - Ot Wernsdorf. The subject of this tendering procedure is the construction preparation / clearing of the construction site. Rough quantities of the measure: 1. Construction site preparation - setting up and clearing the construction site - maintaining the construction site - staking out the construction area - erecting, maintaining and removing 20.00 m of construction fencing 2. Traffic safety - traffic law. Obtaining orders - 20.00 m of protective fence erected - clearing - moving the protective fence 3. Demolition, felling and clearing work - 23.00 pieces of felling trees, trunk circumference 30 - 50 cm - 18.00 pieces of felling trees, trunk circumference >50 - 100 cm - 27.00 pieces of felling trees, trunk circumference >100 - 200 cm - 2.00 pieces of felling trees, trunk circumference >200 cm - 250 cm - 3,500.00 m2 of building site clearing branches, growth, trunk circumference. Up to 50 cm - professional disposal of cuttings, trunks, roots and crown material
Closing Date8 Jan 2025
Tender AmountRefer Documents
City Of Valencia Tender
Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Philippines
Details: Description Local Government Of Valencia Catarata Street, Poblacion, Valencia City, Bukidnon, Philippines Philippine Access (088) 828-5430 Contract Reference No. 48-2024 12/14/2024 Invitation To Bid For The Construction Of Canopy And Other Structures, City Health Office At Barangay Poblacion, Valencia City, Bukidnon 1. The City Government Of Valencia Through Its Annual Appropriations Intends To Apply The Sum Of Four Million Seven Hundred Seventy-three Thousand Two Hundred Four Pesos And 84/100 (php 4,773,204.84) Being The Approved Budget Of The Contract (abc) To Payments Under The Contract For The Construction Of Canopy And Other Structures, City Health Office At Barangay Poblacion, Valencia City, Bukidnon. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The City Government Of Valencia Now Invites Bids For The Construction Of Canopy And Other Structures, City Health Office At Barangay Poblacion, Valencia City, Bukidnon. Particulars Describes As Follows: Item No. Qty Unit Description Specifications Unit Cost Total Cost 1 1 Lot Construction Of Canopy And Other Structures, City Health Office Php4,773,204.84 ● Construction Of Walkway Canopy ● Renovation Of Porte Cochery Roof ● Construction Of Waiting Area With Drinking Fountain And Handwashing Area ● Fabrication And Installation Of Mrf ● Construction Of Perimeter Fence ● Removal And Replacement Of Tb Dots Polycarbonate Roof Sheets ● Removal And Replacement Of Concrete Pavement Leading To Tb Dots ● Construction Of Parking Area And Outdoor Kitchen Scope Of Works: A.) Application Of Permits And Clearances, B.) Fabrication And Installation Of Project Billboard And Signboard, C.) Occupational Safety And Health Program, D.) Project Mobilization And Demobilization, G.) Demolition Of Kitchen, Pavement To Tb Dots And Porte Cochery Roof; Structure Excavation For Concrete Structures Such As Footings And Wall Footingh.) Gravel Fill For Footings, Wall Footing And Floors, I.) Construction Of Reinforced Concrete Structures Such As Footing, Pedestals, Wall Footing, Lavatory, Canal And Floors, J.) Fabrication And Installation Of Formworks And Falseworks, K.) Embankment From Structure Excavation, L.) Fabrication And Installation Of Steel Structures Roof Framings Such As Rafter, Girt, Anchor Bolt, Baseplate, Fascia Frame, Purlins, M.) Installation Of Pre-painted Metal Sheets And Fabricated Metal Accessories Such As Flashings And Gutter, Polycarbonate Roof, Acp, Pvc Ceiling, O.) Installation Of Metal Frames And Fiber Board On Fascia Board (fiber Cement Board), P.) Painting Works On All Steel And Concrete Structures, Q.)installation Of Plumbing Fixtures, Gratings, Barb Wire, Plumbing Works (including Handwashing Sink And Drinking Fountain), Storm Drainage And Downspout, R.) Installation Of Electrical Works, S.) Purchase & Installation Of Industrial Fan, Complete As Per Approved Pow, Plans, And Specifications. Part I General Requirements B.3 (1) 1.00 L.s. Permits And Clearances B.5 (1) 1.00 Ea. Project Billboard / Signboard B.7 (1) 1.00 L.s. Occupational Safety And Health Program B.9 (1) 1.00 L.s. Mobilization / Demobilization Part Ii Civil, Mechanical, Electrical And Sanitary/plumbing Works See Attached Plan And Specifications Part A Earthwork 801 (1) 1.00 L.s. Removal Of Structures And Obstruction 803 (1) A 168.74 Cu.m. Structure Excavation (common Soil) 804 (1) A 53.44 Cu.m. Embankment From Structure Excavation(common Soil) 804 (7) 31.66 Cu.m. Gravel Fill Part B Plain And Reinforced Concrete Work 900 (1) C 49.17 Cu.m. Structural Concrete (3000psi, Class A, 28 Days) 902 (1) A1 3,212.35 Kg. Reinforcing Steel (deformed, Grade 40) 903 (2) 101.12 Sq.m. Formworks And Falseworks Part C Finishings And Other Civil Works C.2 Masonry Works 1046 (2) A1 209.24 Sq.m. Chb Non Load Bearing (including Reinforcing Steel, 100mm) C.3 Fabricated Materials 1007 (1) B 5.25 Sq.m. Aluminum Framed Glass Door (swing Type) 1008 (1) A 44.52 Sq.m. Aluminum Glass Windows (sliding Type) 1008 (1) C 10.40 Sq.m. Aluminum Glass Windows (awning Type) 1008 (1) D 5.19 Sq.m. Aluminum Glass Windows (fixed Type) C.4 Finishing Works 1003(1)a1 147.40 Sq.m. Ceiling (6mm Marine Plywood On Metal Frame) 1003(1)a2 17.98 Sq.m. Ceiling (pvc Panel Board On Metal Frame) 1003(2)1 1.00 L.s. Parapet Wall (aluminum Composite Panel On Aluminum Frame) 1003 (11) A1 39.90 M. Fascia Board (fiber Cement Board) 1018 (1) 172.91 Sq.m. Glazed Tiles And Trims 1027 (1) 316.44 Sq.m. Cement Plaster Finish C.5 Painting Works 1032 (1) A 525.04 Sq.m. Painting Works (masonry) 1032 (1) C 572.85 Sq.m. Painting Works (steel) C.6 Roof Framing And Roofing Works 1013 (2) A2 50.10 L.m. Fabricated Metal Roofing Accessory (gauge 26) - Flashings 1013 (2) B1 25.00 L.m. Fabricated Metal Roofing Accessory (gauge 24) - Gutters 1014 (1) B2 548.64 Sq.m. Prepainted Metal Sheets (rib Type, Long Span, Above 0.427 Mm) See Attached Plan And Specifications 1036(1) A 70.56 Sq.m. Polycarbonate (sheets) 1047 (1) 6,302.64 Kgs Structural Steel 1047 (2) B 2,348.63 Kg. Structural Steel (purlins) 1047 (3) C 28.00 Ea. Metal Structure Accessories (turnbuckle) - 12mm Ø 1047 (4) 157.35 Kg. Metal Structure Accessories (cross Bracing) 1047 (6) 356.77 Kg. Metal Structure Accessories (steel Plates) 1047 (7) A 96.36 Kg. Metal Structure Accessories (bolts) 1047 (7) B 16.19 Kg. Metal Structure Accessories (sagrods) - 10mmø 503(1) 17.00 Sets Metal Frames And Grating C.7 Plumbing Works 1001 (5) B 4.00 Ea. Catch Basin (chb) 1001 (8) 1.00 L.s. Sewer Line Works 1002 (4) 1.00 L.s. Plumbing Fixtures (including Drinking Fountain And Handwashing Area) 1002 (24) 1.00 L.s. Cold Water Lines Part D Electrical Works 1100 1.00 L.s Conduits, Boxes And Fittings (conduit Works/conduit Rough-in) 1200 (3) 1.00 L.s Stand Fan, Industrial Type 1101 (33) 1.00 L.s. Wires And Wiring Devices 1102 (1) 1.00 L.s. Panelboard With Main & Branch Breakers 1103 (1) 1.00 L.s. Lighting Fixture And Lamps Php4,773,204.84 Required Number Of Days For Completion Is 195 Calendar Days. Bidders Should Have Completed A Contract Similar To The Project Within 10 Years From The Date Of Submission And Receipt Of The Bid Hereof. The Description Of An "eligible Bidder" Is Contained In The Bidding Documents, Particularly In Section Ii. Instructions To Bidders. 3. No Time Extension Shall Be Granted Unless On Fortuitous Event, Acts Of Nature Or Any Natural Calamities. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary "pass/fail" Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act". Bidding Is Restricted To Filipino Citizens, Sole Proprietorship, Partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. 5. Interested Bidders May Obtain Further Information From Josafat L. Caipang, Head Of Lgu-valencia City Bac Secretariat And Inspect The Bidding Documents At Address Given Below From Mondays-fridays 8:00 Am To 5:00 Pm. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders On December 15, 2024 To Opening Date From The Address Below And Upon Payment Of Non-refundable Fee For The Bidding Documents In The Amount Five Thousand Pesos (php 5,000.00). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) Provided That The Bidders Shall Pay The Non-refundable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. Site Inspection Is Required From Every Interested Bidder And Site Inspection Certificate Shall Form Part Of The Bid Documents. No Site Inspection Certificate Shall Mean Automatic Disqualification. Site Inspection Schedule Is On December 20, 2024 At 10:00 O’clock In The Morning, Assembly Area At Bac Office. 6. The City Government Of Valencia Will Hold Its Pre-bid Conference On December 23, 2024 (1:30 Pm) At The Bac Office, City Hall Compound, City Of Valencia, Bukidnon Which Shall Be Open To All Interested Bidders. 7. Only Project Engineers, Materials Engineer And The Like Are Required To Attend The Pre-bid Conference. In The Absence Of The Same, The Representative Must Present To The Bac An Authorization Letter Signed By The Owner. 8. Interested Contractor Are Required To Include In Their Technical Bid Proposal The Duly Signed List Of Contractor's Equipment Units, Which Are Owned, Leased And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project. 9. Prospective Bidders Who Were Not Able To Purchase Bid Documents Prior To The Bid Opening Shall Not Be Opened And Will Be Disqualified. 10. Bids Must Be Delivered To The Address Below On Or Before (1:00 Pm) January 6, 2025. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms In The Amount Stated In Itb Clause 18. Bids Will Be Opened In The Presence Of The Bidders’ Representative Who Chooses To Attend At The Address Below. Bid Opening Shall Be On (1:30 Pm) January 6, 2025 At Bac Office, City Hall Compound, City Of Valencia, Bukidnon. Late Bids Shall Not Be Accepted. The Clock In The Bac Office Shall Serve As The Time Reference, And Shall Be The Basis For The Official Time Received Of The Bidding Documents Submitted In The Office. 11. The City Government Of Valencia Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expenses Incurred In The Preparation Of The Bid. 12. The Head Of The Procuring Entity (hope) Reserves The Right To Accept Or Reject Any Or All Bids To Annul The Bidding Process, At Any Time Prior To Contract Award Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 13. All Correspondence Shall Be Addressed To The Bac Secretariat, Attention: Mr. Abe P. Gillaco, Mpa, Bac Chairman. 14. For Further Information, Please Refer To: Lgu Valencia City-josafat L. Caipang Admin Office, 8709 Catarata St., Poblacion, Valencia City, Bukidnon Tel. No. (088) 828-5430 Abe P. Gillaco, Mpa Bac Chairman
Closing Date6 Jan 2025
Tender AmountPHP 4.7 Million (USD 80.9 K)
National Irrigation Administration Tender
Civil And Construction...+1Irrigation Work
Philippines
Details: Description Section I. Invitation To Bid Invitation To Bid For Construction Of Solar Powered Irrigation Project, Const. Of Reinforced Concrete Tanks And Installation Of Pipelines For Baluno Spip The National Irrigation Administration – Regional Office Ix Bac, Through The Cy 2024 National Expenditure Program (nep) For General Appropriation Act (gaa) 2024 Fund, Invites Contractors To Submit Bids For The Following Contract: Contract Reference No. : Niar9-carpic2024-202 (infra) Project Name : Baluno Spip Contract Location : Isabela, Basilan Scope Of Works : Construction Of Solar Powered Irrigation Project, Const. Of Reinforced Concrete Tanks And Installation Of Pipelines Approved Budget For The Contract (abc) : Php 17,753,717.16 Contract Duration : 216 Calendar Days Amount Of Bidding Documents : Php 25,000.00 The Nia – Ro9 Bac Is Conducting A Public Bidding For This Contract In Accordance With Republic Act 9184, Otherwise Known As The “government Procurement Reform Act” And Its Revised Implementing Rules And Regulations (rirr). To Be Eligible To Bid For The Above-stated Contract, A Contractor Must Meet The Following Major Requirements: (a) Filipino Citizen Or 60% Filipino-owned Partnership/corporation; (b) Completion Of A Similar Contract Costing At Least 50% Of The Abc, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To Abc. Interested Bidders Are Required To Submit Two (2) Valid Ids Of The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc. Updated Company Profile Shall Also Be Submitted And Presented To The Nia-r9 Bac Secretariat Upon Purchased Of The Bidding Documents. Credit Line Commitment Shall No Longer Be Accepted As An Alternative To The Prospective Bidder’s Computation Of Nfcc Per Gppb Resolution No. 20-2013 Dated July 30, 2013. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion In The Eligibility Check, Preliminary Evaluation Of Bids, Post Qualification, And Award. The Significant Times And Deadlines Of Procurement Activities Are Shown Below: Issuance Of Bidding Documents : December 7 – 26, 2024 At 8:30 Am Pre-bid Conference : December 13, 2024 At 9:00 Am Submission Of Bids : December 26, 2024 At 8:30 Am Opening Of Bids : December 26, 2024 At 9:00 Am Interested Bidders May Obtain Further Information From Nia – Ro9 Bac And Inspect The Bidding Documents At The Address Given Below Starting December 7 – 26, 2024. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Non-refundable Fee For The Bidding Documents Prescribed In The Above-mentioned List Of Projects. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. Only The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc Shall Be Authorized To Purchase And Submit Bidding Documents. The Use Of Special Power Of Attorney (spa) Is Prohibited As Per Nia Memorandum Circular No.52 Series 2014 Dated December 1, 2014. The Nia – Ro9 Bac Will Hold A Pre-bid Conference On 13 December 2024 At 9:00 Am At Conference Room, National Irrigation Administration – Regional Office Ix, Regional Center, Balintawak, Pagadian City, Which Shall Be Open To All Interested Parties. Bids Must Be Duly Received By The Bac Secretariat Thru Manual Submission At The Office Address As Indicated Below On Or Before 26 December 2024 At 08:30 Am. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Securing Declaration Or Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb. Clause 18.1. Bids Will Be Opened In The Presence Of The Bidder’s Authorized Managing Officer Or Authorized Liaison Officer Of Interested Parties At The Address Below. The Nia – Ro9 Bac Additional Guidelines Is The Conduct Of Site Inspection To Be Scheduled During Pre-bid Conference. • The Certificate Of Site Inspection Shall Be Issued And Signed By The Nia R9 Authorized Representative After The Activity, Which Shall Be Required To Include In The Bid Tender (technical Component). Prospective Bidders Shall Submit Their Sealed Envelopes Together With The Duly Accomplished Forms As Provided In The Bd’s On Or Before The Deadline Of Dropping Of The Bid Documents At The Nia – Ro9 Bac By The Authorized Managing Officer (amo) Or Authorized Liaison Officer Indicated In The Submitted Company Profile/crc Of The Parties. The Liaison Officer Shall Submit A Letter From The Amo Authorizing Her/him To Drop Their Bid, Attend The Bidding Process And Also Submit A Copy Of Company I.d. For Verification. No Special Power Of Attorney (spa) Shall Be Allowed. The Procuring Entity Shall Not Be Held Responsible Of Any And All Bid Documents/proposals Losses. All Interested Contractors/bidders Must Inform The Bac Chairperson Thru Its Secretariat Of Their Documents Submitted In Any Means Provided Above Before The Date Of The Bid Opening To Avoid Late Submission. The Nia – Ro9 Bac Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders, In Accordance With The Provisions Of Section 41 Of Ra 9184 And Its Irr. Pursuant To Nia Memorandum Circular No. 119 S. 2020, Subject: Policy On Utilization Of Videoconferencing, Webcasting Or Similar Technology In The Conduct Of Public Procurement Activities, Procurement Proceedings For The Above Mention Contracts Will Be Held Through Face-to-face Meeting In Combination With Video Conferencing Using Google Meet Thru The Links: Pre-bidding Conference : Https://meet.google.com/hev-uxfp-utg Opening Of Bids : Https://meet.google.com/bkn-midq-rvv Any Requests For Additional Information Concerning This Bidding Shall Be Directed To The Following: Marietta M. Cortes Bac Secretariat Head, Nia-regional Office Regional Center Ix, Balintawak, Pagadian City, Zambo. Sur Niaregion9bac@gmail.com 09630884373 – Office Number Date Posted: December 7, 2024 (sgd) Antonio B. Gujeling Bac Chairperson 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Completed For The Past Five (5) Years. • Irrigation And Flood Control With Experience In Solar Powered Pumps To Be Eligible To Bid For The Contract, Bidders Must Have Done A Single Largest Completed Contract (slcc) Containing A Category Of Work Which Is The Same As Or Similar To The Major Category Of Works, And Who’s Total Slcc Cost Is At Least 50% Of The Approved Budget For The Contract (abc) To Be Bid. The Above Slcc Must Be Supported By A Copy Of The Contract, Certificate Of Completion, And Owner’s Certificate Of Final Acceptance (1-year After The Issuance Of The Certificate Of Completion) Issued By The Project Owner Other Than The Contractor Or A Final Rating Of At Least Satisfactory In The Constructors Performance Evaluation System (cpes). In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted. 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Interested Bidders Shall Have At Least Or Any Equivalent To Pcab Size Range “small B” Category: C & D (per Pcab Board Resolution No. 201, Series Of 2017) 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel Relevant Experience General Experience Number Project Engineer 5 Years Licensed Civil Engineer. Shall Render Full-time Service To The Project Until Completion. 5 Years 1 Office Engineer 3 Years Licensed Civil Engineer. Shall Render Full-time Service To The Project Until Completion. 3 Years 1 Materials Engineer 1 3 Years Shall Be An Accredited Material Engineer Of Dpwh. Shall Render Service To The Project As Required. 3 Years 1 Foreman 5 Years Experienced In Irrigation Structures. Shall Render Fulltime Service To The Project Until Completion. 5 Years 1 Safety & Health Officer (so2) 3 Years Shall Have At Least 3 Years’ Experience In Construction Industry. Completed Cosh Training And Shall Render Fulltime Service To The Project Until Completion. 3 Years 1 Geodetic Engineer 3 Years Licensed Geodetic Engineer. Shall Render Service To The Project As Required. 3 Years 1 Electrical Engineer 3 Years A Licensed Electrical Engineer With Experience In Solar Powered Irrigation Projects. Shall Render Service To The Project As Required. 3 Years 1 Mechanical Engineer 3 Years A Licensed Mechanical Engineer With Experience In Solar Powered Irrigation Projects. Shall Render Service To The Project As Required. 3 Years 1 The Contractor May Assign Other Support Personnel From Those Listed For The Optimal Performance Of The Project Construction Team. The Support Personnel Shall Undertake The Required Day-to-day Site Or Office-related Activities Of The Contractor. Full Time Services Mean, The Personnel Involved Shall Render Minimum Of Eight (8) Hours A Day Or Forty (40) Hour A Week And Shall Be Available Upon Request Of The Procuring Entity. 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity No. Of Units Dumptruck 6 Cu.m 2 Cargo Truck 8 Tons 1 Concrete Mixer 2 – Bagger 2 Butt Fusion Machine Up To 4” Diameter 1 Crawler Type Drilling Rig (rotary Or Hydraulic Driven) 100m 1 Welding Machine 300a 1 Generator Set 15kva 1 Survey Instrument 1 Set Initial Equipment Requirement Upon Mobilization: Equipment Capacity No. Of Units Dumptruck 6 Cu.m 2 Cargo Truck 8 Tons 1 Crawler Type Drilling Rig (rotary Or Hydraulic Driven) 100m 1 Survey Instrument 1 Set The Proof Of Ownership Of Equipment Requirements Are Copies Of Current Lto Official Receipt (or) And Certificate Of Registration (cr) Of The Equipment Which Should Be Attached Together With The Affidavit Of Ownership. In Case Of Leased Equipment, A Lease Contract And Affidavit Of Commitment Or Certificate Of Availability Of Equipment Should Be Submitted With The Lessor/owner As The Pledger Of The Equipment, Stating Therein That The Equipment Will Be Available For The Whole Duration Of The Project. For Purchase Agreement, The Description Of The Equipment To Be Purchased Such As Brand/model, Type Of Equipment, Motor No., Body No. And The Capacity Must Be Indicated In The Document, Otherwise, The Bac Will Not Honor The Purchase Agreement And The Bidder Will Be Declared As Non-complying. Likewise, List Of Contractor’s Major Equipment Units Pledged To Be Used For The Project Must Be Supported By Proof Of Ownership If It Is Owned, Lease Agreement If It Is Being Leased And Purchase Agreement If To Be Purchased. A Certification Of Availability Of Equipment For The Duration Of The Project Must Also Be Provided By The Equipment Owner And/or Lessor/vendor. The Bidder Should Also Specify In The Submitted Bid The Location Of The Equipment Where It Can Be Inspected. If Any Piece Of Equipment Is Not In The Specified Location, Then The Bidder Shall Be Post-disqualified. Item No. Description Qty Unit I. Temporary Works & Mobilization/demobilization Mobilization/demobilization 1 Ls Temporary Facilities 1 Ls Project Billboard 1 Ls Ii. Construction Safety And Health 1 Ls Iii. Construction Of Solar Pump Irrigation System Well Drilling, Development And Testing W/ 6” Casing (until Good Aquifer Is Reached) 2.00 Set Solar Module Mounting Structure 2.00 Set Solar Power Controller Housing (4x2 Meters) 2.00 Set Perimeter Fence 2.00 Set Delivery And Installation Of Lighting Arrester 2.00 Set Pv Modules-solar Panels 600 Watts (please See Attached Plans) 2.00 Set 5hp Hybrid Ac/dc Submersible Water Pump Power: 5.5hp/4000w Voltage (ac): 85v-280v Voltage (dc): 80v-550v Max. Flow: 19m3/h Max. Head: 135m Outlet: 2” 2.00 Set Hybrid Dc/ac Controller (11kw) 2.00 Set Delivery & Installation Of Cabling & Accessories For Solar Pump System 2.00 Set Cctv Security System 2.00 Set Iv. Construction Of Reinforced Concrete Tank Common Excavation (manual) 91.14 Cu.m 3000 Psi Concrete 66.87 Cu.m Rsb (cutting, Bending & Placing Of Rebars) 5,969.78 Kg Rc Tank Accessories (gate Valve, Pipes, Etc.) 3.00 Ls Common Backfill (manual) 118.47 Cu.m V. Installation Of Water Distribution Pipe W/ Appurtenant Structures Common Excavation (manual) 684.12 Cu.m 4” Ø Hdpe Pipe Sdr 11 (w/ Free Delivery, Connectors & Fittings) 3,177.00 Ln.m 2” Ø Hdpe Pipe Sdr 11 (w/ Free Delivery, Connectors & Fittings) 220.00 Ln.m Water Top Stand 2.00 Set Common Backfill (manual) 405.67 Cu.m
Closing Soon26 Dec 2024
Tender AmountPHP 17.7 Million (USD 300.9 K)
National Irrigation Administration Tender
Civil And Construction...+1Irrigation Work
Philippines
Details: Description Invitation To Bid For Construction Of Solar Powered Irrigation Project, Construction Of Reinforced Concrete Tanks And Installation Of Pipelines For Upper Masaba Sip The National Irrigation Administration – Regional Office Ix Bac, Through The Cy 2025 National Expenditure Program (nep) For General Appropriation Act (gaa) 2025 Fund, Invites Contractors To Submit Bids For The Following Contract: Contract Reference No. : Niar9-epa-sip2025-015 (infra) Project Name : Upper Masaba Sip Contract Location : Quiniput, Zamboanga City Scope Of Works : Construction Of Solar Powered Irrigation Project, Construction Of Reinforced Concrete Tanks And Installation Of Pipelines For Upper Masaba Sip Approved Budget For The Contract (abc) : Php 9,894,609.41 Contract Duration : 168 Calendar Days Amount Of Bidding Documents : Php 10,000.00 The Nia – Ro9 Bac Is Conducting An Early Procurement Activity (epa) On Public Bidding For This Contract In Accordance With Republic Act 9184, Otherwise Known As The “government Procurement Reform Act” And Its Revised Implementing Rules And Regulations (rirr). To Be Eligible To Bid For The Above-stated Contract, A Contractor Must Meet The Following Major Requirements: (a) Filipino Citizen Or 60% Filipino-owned Partnership/corporation; (b) Completion Of A Similar Contract Costing At Least 50% Of The Abc, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To Abc. Interested Bidders Are Required To Submit Two (2) Valid Ids Of The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc. Updated Company Profile Shall Also Be Submitted And Presented To The Nia-r9 Bac Secretariat Upon Purchased Of The Bidding Documents. Credit Line Commitment Shall No Longer Be Accepted As An Alternative To The Prospective Bidder’s Computation Of Nfcc Per Gppb Resolution No. 20-2013 Dated July 30, 2013. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion In The Eligibility Check, Preliminary Evaluation Of Bids, Post Qualification, And Award. The Significant Times And Deadlines Of Procurement Activities Are Shown Below: Issuance Of Bidding Documents : December 21, 2024 – January 20, 2025 At 8:30 Am Pre-bid Conference : January 8, 2025 At 9:00 Am Submission Of Bids : January 20, 2025 At 8:30 Am Opening Of Bids : January 20, 2025 At 9:00 Am Interested Bidders May Obtain Further Information From Nia – Ro9 Bac And Inspect The Bidding Documents At The Address Given Below Starting December 21, 2024 – January 20, 2025. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Non-refundable Fee For The Bidding Documents Prescribed In The Above-mentioned List Of Projects. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. Only The Authorized Managing Officer/authorized Liaison Officer Indicated In The Submitted Company Profile/crc Shall Be Authorized To Purchase And Submit Bidding Documents. The Use Of Special Power Of Attorney (spa) Is Prohibited As Per Nia Memorandum Circular No.52 Series 2014 Dated December 1, 2014. The Nia – Ro9 Bac Will Hold A Pre-bid Conference On 08 January 2025 At 9:00 Am At Conference Room, National Irrigation Administration – Regional Office Ix, Regional Center, Balintawak, Pagadian City, Which Shall Be Open To All Interested Parties. Bids Must Be Duly Received By The Bac Secretariat Thru Manual Submission At The Office Address As Indicated Below On Or Before 20 January 2025 At 08:30 Am. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Securing Declaration Or Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb. Clause 18.1. Bids Will Be Opened In The Presence Of The Bidder’s Authorized Managing Officer Or Authorized Liaison Officer Of Interested Parties At The Address Below. The Nia – Ro9 Bac Additional Guidelines Is The Conduct Of Site Inspection To Be Scheduled During Pre-bid Conference. • The Certificate Of Site Inspection Shall Be Issued And Signed By The Nia R9 Authorized Representative After The Activity, Which Shall Be Required To Include In The Bid Tender (technical Component). Prospective Bidders Shall Submit Their Sealed Envelopes Together With The Duly Accomplished Forms As Provided In The Bd’s On Or Before The Deadline Of Dropping Of The Bid Documents At The Nia – Ro9 Bac By The Authorized Managing Officer (amo) Or Authorized Liaison Officer Indicated In The Submitted Company Profile/crc Of The Parties. The Liaison Officer Shall Submit A Letter From The Amo Authorizing Her/him To Drop Their Bid, Attend The Bidding Process And Also Submit A Copy Of Company I.d. For Verification. No Special Power Of Attorney (spa) Shall Be Allowed. The Procuring Entity Shall Not Be Held Responsible Of Any And All Bid Documents/proposals Losses. All Interested Contractors/bidders Must Inform The Bac Chairperson Thru Its Secretariat Of Their Documents Submitted In Any Means Provided Above Before The Date Of The Bid Opening To Avoid Late Submission. The Nia – Ro9 Bac Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders, In Accordance With The Provisions Of Section 41 Of Ra 9184 And Its Irr. Pursuant To Nia Memorandum Circular No. 119 S. 2020, Subject: Policy On Utilization Of Videoconferencing, Webcasting Or Similar Technology In The Conduct Of Public Procurement Activities, Procurement Proceedings For The Above Mention Contracts Will Be Held Through Face-to-face Meeting In Combination With Video Conferencing Using Google Meet Thru The Links: Pre-bidding Conference : Https://meet.google.com/hev-uxfp-utg Opening Of Bids : Https://meet.google.com/bkn-midq-rvv 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Completed For The Past Five (5) Years. • Irrigation And Flood Control With Experience In Solar Powered Pumps To Be Eligible To Bid For The Contract, Bidders Must Have Done A Single Largest Completed Contract (slcc) Containing A Category Of Work Which Is The Same As Or Similar To The Major Category Of Works, And Who’s Total Slcc Cost Is At Least 50% Of The Approved Budget For The Contract (abc) To Be Bid. The Above Slcc Must Be Supported By A Copy Of The Contract, Certificate Of Completion, And Owner’s Certificate Of Final Acceptance (1-year After The Issuance Of The Certificate Of Completion) Issued By The Project Owner Other Than The Contractor Or A Final Rating Of At Least Satisfactory In The Constructors Performance Evaluation System (cpes). In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted. 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Interested Bidders Shall Have At Least Or Any Equivalent To Pcab Size Range “small B” Category: C & D (per Pcab Board Resolution No. 201, Series Of 2017) 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel Relevant Experience General Experience Number Project Engineer 5 Years Licensed Civil Engineer. Shall Render Full-time Service To The Project Until Completion. 5 Years 1 Office Engineer 3 Years Licensed Civil Engineer. Shall Render Full-time Service To The Project Until Completion. 3 Years 1 Materials Engineer 1 3 Years Shall Be An Accredited Material Engineer Of Dpwh. Shall Render Service To The Project As Required. 3 Years 1 Foreman 5 Years Experienced In Irrigation Structures. Shall Render Fulltime Service To The Project Until Completion. 5 Years 1 Safety & Health Officer (so2) 3 Years Shall Have At Least 3 Years’ Experience In Construction Industry. Completed Cosh Training And Shall Render Fulltime Service To The Project Until Completion. 3 Years 1 Geodetic Engineer 3 Years Licensed Geodetic Engineer. Shall Render Service To The Project As Required. 3 Years 1 Electrical Engineer 3 Years A Licensed Electrical Engineer With Experience In Solar Powered Irrigation Projects. Shall Render Service To The Project As Required. 3 Years 1 Mechanical Engineer 3 Years A Licensed Mechanical Engineer With Experience In Solar Powered Irrigation Projects. Shall Render Service To The Project As Required. 3 Years 1 The Contractor May Assign Other Support Personnel From Those Listed For The Optimal Performance Of The Project Construction Team. The Support Personnel Shall Undertake The Required Day-to-day Site Or Office-related Activities Of The Contractor. Full Time Services Mean, The Personnel Involved Shall Render Minimum Of Eight (8) Hours A Day Or Forty (40) Hour A Week And Shall Be Available Upon Request Of The Procuring Entity. 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity No. Of Units Crawler Type Drilling Rig (rotary Or Hydraulic Driven) 100m 1 Generator Set 15kva 1 Welding Machine 300a 1 Dumptruck 6 Cu.m 1 Concrete Mixer 1 – Bagger 1 Butt Fusion Machine Up To 6” Diameter 1 Survey Instrument 1 Set Initial Equipment Requirement Upon Mobilization: Equipment Capacity No. Of Units Crawler Type Drilling Rig (rotary Or Hydraulic Driven) 100m 1 Dumptruck 6 Cu.m 1 Survey Instrument 1 Set The Proof Of Ownership Of Equipment Requirements Are Copies Of Current Lto Official Receipt (or) And Certificate Of Registration (cr) Of The Equipment Which Should Be Attached Together With The Affidavit Of Ownership. In Case Of Leased Equipment, A Lease Contract And Affidavit Of Commitment Or Certificate Of Availability Of Equipment Should Be Submitted With The Lessor/owner As The Pledger Of The Equipment, Stating Therein That The Equipment Will Be Available For The Whole Duration Of The Project. For Purchase Agreement, The Description Of The Equipment To Be Purchased Such As Brand/model, Type Of Equipment, Motor No., Body No. And The Capacity Must Be Indicated In The Document, Otherwise, The Bac Will Not Honor The Purchase Agreement And The Bidder Will Be Declared As Non-complying. Likewise, List Of Contractor’s Major Equipment Units Pledged To Be Used For The Project Must Be Supported By Proof Of Ownership If It Is Owned, Lease Agreement If It Is Being Leased And Purchase Agreement If To Be Purchased. A Certification Of Availability Of Equipment For The Duration Of The Project Must Also Be Provided By The Equipment Owner And/or Lessor/vendor. The Bidder Should Also Specify In The Submitted Bid The Location Of The Equipment Where It Can Be Inspected. If Any Piece Of Equipment Is Not In The Specified Location, Then The Bidder Shall Be Post-disqualified. Item No. Description Qty Unit I Temporary Works & Mobilization/demobilization Mobilization/demobilization 1.00 Ls Temporary Facilities 1.00 Ls Project Billboard 1.00 Ls Ii Construction Safety & Health 1.00 Ls Iii Construction Of Solar Pump Irrigation System Well Drilling, Development And Testing W/ 6" Casing (until Good Aquifer Is Reached.) 1.00 Lot Solar Module Mounting Structure 1.00 Lot Solar Power Controller Housing (4x2 Meters) 1.00 Lot Perimeter Fence 1.00 Lot Delivery And Installation Of Lightning Arrester 1.00 Lot Pv Modules-solar Panels 600 Watts (please See Attached Plans.) 1.00 Lot 5hp Hybrid Ac/dc Submersible Water Pump Power: 5.5hp/4000w Voltage (ac): 85v-280v Voltage (dc): 80v-550v Max. Flow: 19m³/h Max. Head: 135m Outlet: 2" Body Diameter: 3 3/4" 1.00 Lot Hybrid Dc/ac Controller (11kw) 1.00 Lot Delivery & Installattion Of Cabling & Accessories For Solar Pump System 1.00 Lot Cctv Security System 1.00 Lot Construction Of Reinforced Concrete Tank Common Excavation (manual) 91.14 Cu.m 3000 Psi Concrete 66.87 Cu.m Rsb (cutting, Bending & Placing Of Rebars) 5,969.76 Kg Rc Tank Accessories (gate Valve, Pipes, Etc) 3.00 Ls Common Backfill (manual) 118.47 Cu.m Installation Of Water Distribution Pipe W/ Appurtenant Structures Common Excavation (manual) 266.64 Cu.m 4" Ø Hdpe Pipe Sdr 11 (w/ Free Delivery, Connectors& Fittings) 590.00 Ln.m 3" Ø Hdpe Pipe Sdr 11 (w/ Free Delivery, Connectors& Fittings) 570.00 Ln.m Air Release Valve Installation With Accessories 3.00 Ls Water Top Stand 4.00 Set Common Backfill (manual) 134.23 Cu.m
Closing Date20 Jan 2025
Tender AmountPHP 9.8 Million (USD 167.7 K)
Bureau Of Corrections Muntinlupa City Metro Manila Tender
Civil And Construction...+1Building Construction
Philippines
Details: Description Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Philippine Bidding Documents Design And Build Of One (1) Unit 2-storey Dormitory At Curuan, Zamboanga (procurement/contract No. 08) Sixth Edition July 2020 Bids And Awards Committee 2024 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 6 Section Iii. Bid Data Sheet 13 Section Iv. General Conditions Of Contract 19 Section V. Special Conditions Of Contract 24 Section Vi. Specifications 26 Section Vii. Drawings 55 Section Viii. Bill Of Quantities 56 Section Ix. Checklist Of Technical And Financial Documents 57 Section I. Invitation To Bid Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Invitation To Bid Design And Build Of One (1) Unit 2-storey Dormitory At Curuan, Zamboanga 1. The Bureau Of Corrections, Through The National Expenditure Program (nep) Of 2025 Capital Outlay, Intends To Apply The Sum Of One Hundred Eighty Million Pesos Only (₱180,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Design And Build Of One (1) Unit 2-storey Dormitory At Curuan, Zamboanga With Identification Number Epa-008. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bureau Of Corrections Now Invites Bids For Provision Of A Detailed Preliminary Architectural And Engineering Design, Detailed Engineering Requirements And Actual Construction Of The Bureau Of Corrections 2-storey Dormitory At Curuan, Zamboanga, Based On The Final Detailed Architectural And Engineering Design, To Be Approved By The Head Of Procuring Entity Or Its Duly Authorized Representative Conformably With The Minimum Standards Set Forth In The (1) Presidential Decree (pd) No. 1096, National Building Code Of The Philippines (2) Batas Pambansa (bp)blg. 344, An Act To Enhance The Mobility Of Disabled Persons By Requiring Certain Public Buildings, Institutions, Establishments And Public Utilities To Install Facilities And Other Devices (3) National Structural Code Of The Philippines (nscp), Volume I, 2010 (4) Philippine Electrical Code (pec), 2009 (5) Revised Plumbing Code Of The Philippines (6) Revised Irr Of Ra 10575 (7) Republic Act (ra) No. 9514, Revised Fire Code Of The Philippines And (8) Applicable Local Regulations And Ordinances. Completion Of The Works Is Required Within Three Hundred Sixty-five (365) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project Amounting To At Least Fifty Percent (50%) Of The Abc Within The Last Six (6) Years. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act.” Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Cooperatives, And Partnerships Or Organizations With At Least Seventy-five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From Bureau Of Corrections And Inspect The Bidding Documents At The Address Given Below From Monday To Friday From 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On 07 December 2024 From The Given Address And Website(s) Below. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity Bucor.gov.ph, Provided That Bidders Shall Pay The Applicable Fee Of Fifty Thousand (₱50,000.00) Pesos Only For The Bidding Documents Not Later Than The Submission Of Their Bids. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person Or By Facsimile. 6. The Bureau Of Corrections Will Hold A Pre-bid Conference On 16 December 2024 (1:30pm) At Bac Conference Room Nbp Reservation Muntinlupa City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below, On Or Before 30 December 2024 (1:29 Pm). Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 9. Bid Opening Shall Be On 30 December 2024 (1:30 Pm) At The Bac Conference Room Nbp Reservation Muntinlupa City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Bureau Of Corrections Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Ma. Adoracion I. Viñas Office Of The Bac Secretariat Supply Office, Bureau Of Corrections, Muntinlupa City Tel # 02-8809-8587/02-8478-0907 Bacsec2022@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Bucor.gov.ph Date Of Issue: 07 December 2024 Ccsupt Celso S Bravo Chairperson, Bids And Awards Committee Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Bureau Of Corrections Invites Bids For The Design And Build Of One (1) Unit 2-storey Dormitory At Curuan, Zamboanga, With Project Identification Number__________________. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project Design And Build Of One (1) Unit 2-storey Dormitory At Curuan, Zamboanga Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 2025 In The Amount Of One Hundred Eighty Million Pesos Only (₱180,000,000.00). 2.2. The Source Of Funding Is: Nga, The National Expenditure Program 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. [if Procuring Entity Has Determined That Subcontracting Is Allowed During The Bidding, State:] The Bidder Must Submit Together With Its Bid The Documentary Requirements Of The Subcontractor(s) Complying With The Eligibility Criteria Stated In Itb Clause 5 In Accordance With Section 23.4 Of The 2016 Revised Irr Of Ra No. 9184 Pursuant To Section 23.1 Thereof. 7.2. [if Subcontracting Is Allowed During The Contract Implementation Stage, State:] The Supplier May Identify Its Subcontractor During The Contract Implementation Stage. Subcontractors Identified During The Bidding May Be Changed During The Implementation Of This Contract. Subcontractors Must Submit The Documentary Requirements Under Section 23.1 Of The 2016 Revised Irr Of Ra No. 9184 And Comply With The Eligibility Criteria Specified In Itb Clause 5 To The Implementing Or End-user Unit. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address At Bac Conference Room Nbp Reservation Muntinlupa City And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty (120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Architectural, Engineering Design, Detailed Engineering Requirements And Construction Of Building With Concreting Works. 7.1 Subcontracting Is Not Allowed 10.3 A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: For Design Personnel: Key Personnel General Experience Relevant Experience Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience. Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience. Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years’ Experience. Experience In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel: Key Personnel General Experience Relevant Experience Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience. Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. Foreman The Foreman Must Have At Least Five (5) Years’ Experience. Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. Safety Officer The Sanitary Officer Must Have At Least Two (2) Years’ Experience. Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units Backhoe At Least 38hp With 0.055 To 0.160 M3 Bucket Capacity 1 Pay Loader At Least 2.5 To 9.5 M3 Bucket Capacity 1 Dump Truck At Least 10 Cu.m. 2 Generator 50kva 1 Concrete Mixers 1 Bagger 4 Welding Machines 300amp Heavy Duty 4 Submersible Dredging Pump At Least 1hp And 2” Output 1 Prospective Bidders Shall Attach The List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be. 12 No Further Instructions. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than 2% Of The Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less Than 5% Of The Abc, If Bid Security Is In Surety Bond. 19.2 No Further Instructions. 20 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its; 1. Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) 2. Supporting Documents For The Slcc (notice Of Award And/or Notice To Proceed And Project Owner’s Certificate Of Final Acceptance Issued By The Owner Other Than The Contractor Or The Constructors Performance Evaluation System (cpes) Final Rating, Which Must Be At Least Satisfactory. In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted) 3. Certified True Copy Coming From The Issuing Agency Of Valid And Current Registration Certificate (sec Certificate Of Registration For Corporation Or Dti Certificate Of Registration For Sole Proprietorship Or Cda Certificate Of Registration For Cooperative) 4. Valid And Current Mayor’s Or Business Permit 5. Valid And Current Tax Clearance 6. Valid And Current Pcab License And Registration 7. Audited Financial Statement 8. Three (3) Sets Photocopy Of Eligibility And Financial Envelope Duly Marked As “copy No.1”, “copy No.2” And “copy No.3” 21 No Further Instructions. Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property (ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Special Conditions Of Contract Gcc Clause 2 Sectional Completion Is Not Applicable The Intended Completion Date Is Three Hundred Sixty-five (365) Calendar Days From The Date Of Receipt Of The Ntp. 4.1 The Procuring Entity Shall Give Possession Of All Parts Of The Site To The Contractor From The Date Of The Receipt Of Notice To Proceed (ntp). 6 No Further Instructions. 7.2 Fifteen (15) Years. 10 No Dayworks Are Applicable To The Contract. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is One Tenth Of One Percent Of The Total Contract Price. 13 The Amount Of The Advance Payment Is Fifteen Percent (15%) Of The Contract Price Upon Submission To And Acceptance By The Bureau Of Corrections Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, A Bank Guarantee Or A Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission And Confirmed By The Bureau Of Corrections. 14 The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15.1 The Date By Which “as Built” Drawings Are Required Is Upon Actual Completion Of The Project. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Equivalent To Five Percent (5%) Of The Contract Price. Section Vi. Specifications Terms Of Reference Design And Build Of One (1) Unit 2-storey Dormitory At Curuan, Zamboanga Barangay Curuan, Zamboanga, Zamboanga Del Sur Philippines 1. Project Information 1.1 Project Description The Design And Build Of One (1) Unit1 2-storey Dormitory At Srppf Project Represents An Essential Addition To The Existing Infrastructure, Aimed At Addressing The Pressing Need To Decongest The Bucor Prison Facilities. This Additional Facility Is Strategically Designed To Cater To The Ongoing Decongestion Program, Which Is Crucial For Ensuring The Effectiveness And Efficiency Of The National Correctional System. By Providing Additional Capacity And Resources, This Project Will Play A Vital Role In Alleviating Overcrowding And Improving Living Conditions For Inmates. This Initiative Underscores Our Commitment To Proactive Measures That Enhance Rehabilitation Efforts And Promote The Successful Reintegration Of Individuals Into Society. This Project Marks A Crucial Milestone In The Ongoing Efforts To Improve The Correctional System And Support The Rehabilitation Of Inmates. With A Focus On Security, Efficiency, And Sustainability, This Project Aims To Set A New Standard For Correctional Facilities In The Region, Prioritizing The Safety And Well-being Of Both Staff And Inmates. This Project Aims To Be Completed Within A Year, Aligning With Our Objectives For Enhancing The Correctional Infrastructure. This Timeline Underscores Our Commitment To Delivering Timely Solutions That Address The Urgent Needs Of The Correctional System And Contribute To Its Overall Improvement. The Plans And Designs Shall Be In Accordance With The Plan Of The Said Structures As Conceptualized By The Planning And Design Division (pdd) Under The Directorate For Engineering Services Or As Conceptualized By The Winning Bidder If The Latter Is Found To Be Superior (as Defined In Section 3.1.1 Of This Tor). Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Design And Build Of One (1) Unit 2-storey Dormitory At Zamboanga Shall Be Constructed As Per Approved Drawings, Specifications, Bill Of Materials, Scope Of Works And The General Contract Conditions Following The Guidelines As Per Annex G Of Irr Of Ra 9184. The Project Shall Have The Following Basic Components: A. Complete Detailed Architectural And Engineering Design Plans, Technical Specifications, And Design Calculations For The Construction Of The Project. Such Plans, Designs, And Technical Specifications Shall Be Subject For Review And Approval By The Bucor Pdd. The Design Development And The Contract Documents Phases Of The Design Shall Continue After The Bid Is Awarded. It Shall Likewise Be Subject For Review And Approval By The Bucor - Nhq Directorate For Engineering Services. B. The Bid Shall Be Based On The Conceptual/schematic Design Drawings Prepared By The Bucor Pdd Or That Submitted By The Winning Bidder As Defined In Section 3.1.1 Of This Tor. C. The Contractor Shall Complete The Construction Of The Following Facility Component: I. One (1) Unit Two (2) Storey Type B Dormitory(22x79) With 350 Pdl Capacity; Ii. 1x2x2m Double Decker Bunkbeds ( For 350 Pdl Capacity); Iii. Fire Protection System (fire & Jockey Pump), Fire Detection Alarm System And Fire Suppression; Iv. Electrical System: Three-phase Power Line Supply (designed To Supply The Entire Compound Including The Future Developments). Connected From Electrical Local Utility To Compound (project Site); V. Electrical System: Backup Power (three-phase Genset) Supply System With Capacity Not Less Than Total Computed Mva Load, Without Demand Factor (designed To Supply The Entire Compound Including The Future Developments), And To Include Capacitor Bank, If Necessary; Vi. Sanitary And Plumbing Systems: Sewerage And Drainage System (from Point Of Source To Project Site) Vii. Water Supply System: Sufficient Pressure To Provide Potable Water: Cistern Tank, Pumps, And Overhead Water Tank (from Point Of Source To Project Site); Viii. Site Development (grading And Earthworks, Pathways And Drainage System); Ix. Secondary Perimeter Fence With 300w Integrated Solar Light Every 3 Bays And (to Include Post Towers And Gates); X. Admin/security Office To Cover At Least 68.2sqm In Standard Finish; Xi. Cctv Systems (between Fences Enough To Monitor The Whole Compound And Dormitory Hallway); Xii. One (1) Unit Main Security Gate Xiii. Double Layer Perimeter Fence: Concertina/barb Wire Steel Matting Fence Covering More Or Less 391 Ln.m. 1.2 Contractual Framework The Contractual Arrangement To Be Used For The Project Is The Design-and-build (db) Scheme. Under This Scheme The Procuring Entity Awards A Single Contract For The Architectural/engineering Design And Construction To A Single Firm, Partnership, Corporation, Joint Venture Or Consortium. The Winning Contractor Shall Consult And Collaborate With The Bucor Pdd For The Preparation Of The Detailed Architectural Design Of The Project. The Detailed Architectural And Engineering Design Shall Be Subject For The Review And Approval By The Bucor Pdd. Contractors Shall Be Required To Conduct A Bucor Led Site Inspection And Evaluation To Enable The Contractors To Develop Their Proposals Accordingly. The Bucor Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Out Of Any Data Presented By The Contractor. The Obligations And Liabilities Of The Contractor And Its Architect Shall Be Joint And Solidary For Purposes Of The Detailed Architectural Design Of The Project In Accordance With Article 1723 Of The Civil Code Of The Philippines And Other Pertinent Laws. The Db Scheme Of Procurement Was Recommended, Endorsed, And Adopted Pursuant To The Annex G Of Irr Of Ra 9184. 2. Scope Of Contract 2.1 Obligations Of The Winning Bidder/contractor A. Render Architectural And Allied Engineering Design Services Including Final Schematic Design Necessary For The Implementation Of The Project. The Allied Engineering Design Services Shall Include, But Shall Not Be Limited To, Design For Architectural, Civil, Structural, Electrical, Mechanical, Plumbing, And Electromechanical. All Drawings Shall Be Generated Using Modern Modeling/drafting Software And Printed On High Quality 20” X 30” Blue Print Paper. B. Undertake Detailed Architectural And Engineering Designs (daeds) Using The Given Data Such As Topographic, Hydrographic And Cross–section Surveys, Geotechnical And Geological Investigation, And Hydrologic Investigation And Initial Schematic Design Or Design Concept Provided By The Bucor Pdd Which Conforms With The Minimum Performance Specifications And Standards (mpss); C. If Applicable, Secure Environmental Clearance Or An “environmental Compliance Certificate (ecc)”. If The Proposed Project Is Considered Outside The Purview Of The Philippine Environmental Impact Statement (eis) System, A Certificate Of Non- Coverage Or Certificate Of Exemption Shall Be Secured. D. The Project Shall Be Constructed According To The Daeds Prepared By The Winning Bidder And Approved By The Bucor And In Compliance With The Mpss As Well As Provided In Rule Vii, Section 7 Of The Irr Of Ra 10575. Likewise, Construction Includes Conformance To The Provisions Pertaining To Buildings Under The Latest Edition Of The Dpwh Standard Specifications For Public Works Structures, Volumes Ii And Iii (blue Book). The Blue Book Prescribes, Among Other Things, The Material Requirements And Construction Requirements For Different Items Of Work, Including The Tests To Be Conducted During Construction By The Dpwh-accredited Testing Laboratory. The Blue Book Incorporates Pertinent Provisions Of The American Society For Testing And Materials (astm) And American Concrete Institute (aci), Among Other Standards, Pertaining To Construction. Attention Shall Be Given To The Relevant Items Of Work In The Following Parts Of The Blue Book: Volume Ii ➢ Part A – Facilities For The Engineer ➢ Part B – Other General Requirements Volume Iii ➢ Part A – Earthwork ➢ Part B – Plain And Reinforced Concrete Works ➢ Part C – Finishing ➢ Part D – Electrical ➢ Part E – Mechanical ➢ Part I – Water Supply ➢ Part J – Flood Control And Drainage ➢ Part I-c – Drainage Works For Materials And Technologies Not Covered By The Blue Book, Or If The Proponent Intends To Use Any New Material/technology Which Is Not Accredited By The Dpwh Bureau Of Research And Standards (brs), The Proponent Shall Submit A Certification From A Recognized Foreign Or International Institution To The Effect That The New Materials Or Technology Meets The Mpss For This Project And Has Been Successfully Used In Existing Structures With Proven Integrity. The Winning Bidder Or Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Specified In Section 62.2 Of The Irr Of Ra 9184; And, F. The Winning Bidder Or Contractor Shall Be Solely Responsible For The Design And Shall Be Held Responsible For Any Default Resulted From Improper Design. Further, Extended Liability Of The Contractor Since It Stipulated That The Works, When Completed, Shall Be Fit For The Purpose For Which It Was Intended As Defined In The Contract. 2.2 Obligations Of The Bucor A. Provide Full Information On All Requirements For The Project; B. Approve The Winning Bidder Or Contractor’s Design Without Diminishing Their Full And Sole Responsibility For The Quality And Integrity Thereof; C. Give Prompt Written Notice Thereof To Winning Bidder Or Contractor, If It Observes Or Becomes Aware Of Any Defect In The Project; D. Designate, When Necessary, Representatives Authorized To Act On Its Behalf. It Shall Examine Documents Submitted By The Winning Bidder Or Contractor And Render Decisions Pertaining Thereto Promptly, To Avoid Unreasonable Delay In The Progress Of Their Work. It Shall Observe The Procedure Of Issuing Orders To The Winning Bidder Or Contractor; E. Supervise And Monitor The Implementation Of The Project; I. Construction Monitoring And Testing Forms: • The Use Of Construction Monitoring And Testing Forms That Will Be Provide By The Bucor - Nhq Pdd Is Mandatory Throughout The Duration Of Construction. • Oversight Of These Forms Will Be Conducted By The Engineering Services (es) Of The Srppf On Behalf Of The Bucor Pdd • Srppf-es To Impose To Contractor Testing Of All Items After Installation And/or Application. Es To Send Pdd Copy Of The Test Report/s. • Srppf-es To Monitor Material Delivery Of Contractor To Ensure All Materials Installed And/or Applied Are In Accordance With The Specifications Stated On Plans And Contract Of This Project. • In Case There Would Be Substitute Or Alternative To The Original Specification Of Material/s, Srppf-es To Inform Pdd Of Such Variation. Ii. Bucor Engineer Visits: • Nhq Engineers And Architects (personnel Of Pdd) Will Conduct Site Visits On A Quarterly Basis Or Whenever Deemed Necessary To Ensure Compliance With Standards And Regulations. • Pdd- Nhq Personnel To Witness The Final Testing And Commissioning Of The Systems, Equipment And Utilities Prior To Acceptance Of The Project Or Part Of The Project Thereof. Iii. Progress Billing Payment: • Srppf Es Engineers Will Provide Monthly Updates, Or As Deemed Necessary, On The Statement Of Work Accomplishment Based On The Actual Progress Of The Project, Including Reports Update. F. Pay The Accomplishment Accepted In The Conformance With The Mpss Included Under The Design And Build Contract. I. This Reports And Swa Updates Of The Srppf Es Will Be Reviewed And Approved By Nhq - Pdd Prior To Any Progress Billing Payments Being Made. 2.3 Bidding Documents The Bidding Documents For The Project Shall Govern The Conduct Of The Procurement Of The Project. 3. Scope Of Works 3.1 Planning And Design Phase 3.1.1 Preliminary Architectural Plan (pap) By Bidder The Approved Concept Design Shall Adopt The Provisions Indicated In Rule Vii, Section 7 Of The Irr Of Ra 10575. Bidders Shall Submit Also An Alternative Design Concept With Respect To The Actual Site Condition. This Alternative Design By The Winning Bidder Shall Be Adopted Should The Same Be Found To Be Superior Than The One Conceptualized By The Bucor Pdd. 3.1.2 Detailed Architectural And Engineering Design (daed) By The Winning Bidder During The Implementation Of The Project, The Winning Bidder Shall Prepare The Daed Of The Project And Submit The Same To The Bucor For Approval Prior To The Execution Of The Construction Works. The Winning Bidder Shall Prepare The Daed Based On Its Pap As Reviewed And Accepted By The Bucor Pdd And In Accordance With The Minimum Performance Standards And Specifications (mpss). The Daed Shall Be Undertaken With A Degree Of Accuracy That Will Allow Estimates To Be Made Within Approximately Plus Or Minus Five Percent (+/-5%) Of The Final Quantities. Once Approved By The Bucor, The Winning Bidder’s Daed Shall Form Part Of The Mpss. The Bucor-approved Daed, Together With The Mpss Provisions On Construction Under Section 2.0 Hereof, Shall Govern The Actual Construction Undertaken By The Winning Bidder. The Winning Bidder Shall Undertake The Necessary Field Surveys And Investigation In Accordance With The Dpwh Design Guidelines. In Carrying Out These Works, The Winning Bidder Shall Ensure That The Engineering, Environmental, Particularly During Field Investigations And The Development Of The Preliminary And Final Detailed Engineering Designs. The Winning Bidder Shall Ensure That All Designs Submitted For Approval Have Fully Taken Into Account Key Findings From The Engineering, Environmental, And That Negative Environmental Impacts Have Been Minimized Or Eliminated To The Fullest Extent Possible. 3.1.3 Architectural And Engineering Design Submittals I. Architectural Design A. The Building Should Be Designed With Structural, Electrical, Natural Or Combine Ventilation And Natural Lighting Following Building Design Standards. B. The Prospective Bidder Shall Prepare The Preliminary Architectural Plans In Accordance With The Requirements Of The National Building Code Of The Philippines, Accessibility Law (bp 344) Including All Other Applicable Laws And Local Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Site Development Plan 2. Vicinity Map 3. Perspective 4. Floor Plans 5. Elevations A. Front Elevation B. Rear Elevation C. Right Elevation D. Left Elevation 6. Sections A. Longitudinal Section B. Cross Section 7. Doors & Window Schedule 8. Plans And Details Of Stairs And Ramps 9. Schedule Of Finishes For Floors, Walls And Ceiling 10. Miscellaneous Details Ii. Structural Design A. The Proponent Shall Prepare The Necessary Structural Analysis/calculation And Design Of The Structural Members Of The Building Component In Accordance With The National Building Code Of The Philippines With Its Referral Codes Such As The Latest National Structural Code Of The Philippines. The Design For The Structure Shall Take Into Account, Among Other Things, The Seismic Requirements Of The Area To Determine The Optimum Safety Of The Whole Structure And To Minimize Possible Earthquake Damage. B. On The Basis Of The Data Obtained From The Detailed Site Investigations, Topographical/soil And Survey, Geotechnical Engineering, Foundation Investigation, Material Testing, Survey Of Existing Site Conditions, The Seismic Requirements Of The Area, The Load Requirements Of The Building And Other Investigation Required To Obtain The Data Necessary To Ensure The Safety Of The Structure, The Proposal Shall Prepare The Preliminary Structural Design Plans Of The Structure. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Structural Design Criteria And Design Notes 2. Foundation Plan 3. Floor Framing Plans 4. Schedule Of Slab, Beams And Girders 5. Schedule Of Columns 6. Schedule Of Footings 7. Structural Details Of Stairs/ramp, If Applicable 8. Roof Framing Plan, If Applicable 9. Schedule And Details Of Trusses, If Applicable 10. Road Design And Details (if Applicable) 11. Miscellaneous Details Iii. Sanitary/plumbing Design A. General • The Detailed Design Shall Conform To The General Standards Adopted By The Sanitary & Plumbing Code Of The Philippines And Other Pertinent Laws And Ordinances. • All Design Considerations/assumptions Shall Be Based On The Results Of The Technical Studies, Detailed Analyses, And Design Computations. • The Technical Drawings And Specifications Shall Clearly Indicate All The Details Required To Ascertain The Care And Thoroughness Devoted In The Preparation Of The Drawings. B. Drainage And Sewerage • The Drainage Layout Shall Show All The Required Information Such As Direction Of Flow, Manhole-to-manhole Distances, And Sizes Of Lines, Manholes/canals, Location Of Outfalls, Etc. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Sewer, Vent And Storm Drainage Layout 4. Enlarged Toilet Plan For Common And Pwd Toilets 5. Isometric Diagram 6. Miscellaneous Details 7. Drainage And Sewerage System 8. Three Chamber Septic Tank Plans And Details C. Water Supply System • The Proponent Shall Carry Out A Preliminary Detailed Design For The Water Supply Of The Project. The Design Should Be On The Basis Of The Source And Volume Of Water Supply, Water Consumption, Piping Network, And Conveyance In Accordance With The Applicable Laws, Rules And Regulations Governing Health, Safety And Sanitation. • The Contractor Shall Install Elevated Water Storage/s Per Unit Located At The Roof Deck Of The Prison Dormitories. (sufficient Capacity To Supply The Pdl) Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. General Notes 2. Legend & Symbols 3. Water Line Layout 4. Water Line Isometric Diagram 5. Water Reservoir Plans And Details 6. Miscellaneous Details Iv. Electromechanical Design A. Fire Protection System • The Prospective Bidder Shall Prepare A Design For The Fire Protection System In Accordance To The Fire Code Of The Philippines, (irr) Of Ra 9514, And Other Relevant Laws And Ordinances. Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Sprinkler System 2. Sprinkler System Isometric Diagram 3. Fire Fighting Piping System Diagram 4. Fire Alarm System Layout 5. Fire Suppression System Layout 6. Smoke Management System Layout 7. Fire Pump And Jockey Pump And Water Supply 8. Miscellaneous Details V. Electrical Design A. The Prospective Bidder Shall Prepare A Preliminary Design Plan For The Electrical And Power Supply System Of The Building In Accordance With The Electrical Code Of The Philippines, Fire Code Of The Philippines, National Building Code Of The Philippines And Other Relevant Laws And Ordinances. B. The Prospective Bidder Shall Prepare A Design For The Electrical And Power Supply System Considering Ease Of Maintenance And Prevention Of Illegal Connections Including Electrical Supply For Ceiling Fans. C. The Prospective Bidder Shall Prepare A Design For Three-phase Power Line Supply (designed To Supply The Entire Compound Including The Future Developments). Connected From Electric Local Utility To Security Compound (project Site) D. The Prospective Bidder Shall Prepare A Design For Backup Power Supply System With Capacity Not Less Than The Total Computed Mva Load, Without Demand Factor. (designed To Supply The Entire Compound Including The Future Developments). Submittals: (at Suitable Scale On High Quality 20” X 30” Blue Print Paper Minimum Size) 1. Power Riser Diagram 2. Power Layout System 3. Lighting Layout System 4. Local Area Network System, If Applicable 5. Grounding System 6. Load Schedules 7. Others As Applicable Vi. Other Requirements Technical Specifications Boring Test Structural Design And Analysis And Computation Final Design And Construction Plans Upon Award Of Contract, The Contractor Shall Comply The Following: O Prepare Final Draft Of Architectural And Engineering Design Plans Incorporating All Design Refinements And Revisions Based On Project Requirement Or As May Be Required By The Bucor Pdd Within The Scope Of Design. O Submit To The Bucor Design And Build Committee (bucor-dbc) The Final Architectural And Engineering Design Plans And Specifications Duly Signed And Sealed By The Concerned Professional Architect, Engineers, Incorporating All The Necessary Revisions And Refinements For Approval By The Head Of Procuring Entity. 3.2 Construction Phase The Following Works Shall Comprise This Phase: I. Permits And Clearances, The Contractor Shall Upon Authorization Of The Head Of The Procuring Entity (hope), Make Representations With The Government Agencies Concerned To Expedite The Processing Of The Necessary Permits And Certificates Such As The Following: A. Zoning Certification And Locational Clearance B. Building /electrical/sanitary Permits C. Certificate Of Occupancy D. Environmental Clearance Certificate E. All Other Permits/clearances As May Be Required For The Construction. Ii. Mobilization, The Contractor Shall Mobilize All The Required Project Team Personnel, Equipment, Tools, And Manpower With The Required Skills And In Sufficient Number As May Be Necessary For His Efficient Undertaking Of The Project. Iii. Clearing, Grubbing And Hauling/disposal Of Debris Iv. Construction Stage As A Rule, Contract Implementation Guidelines For Procurement Of Infrastructure Projects Shall Comply With Annex “e” Of The Revised Irr Of Ra 9184. The Following Provisions Shall Supplement These Procedures: I. No Works Shall Commence Unless The Contractor Has Submitted The Prescribed Documentary Requirements And Implementing Unit Has Given Written Approval. Work Execution Shall Be In Accordance With Reviewed And Approved Documents. Ii. The Contractor Shall Be Responsible For Obtaining All Necessary Information As To Risks, Contingencies And Other Circumstances Which May Affect The Works And Shall Prepare And Submit All Necessary Documents Specified By The Implementing Unit To Meet All Regulatory Approvals As Specified In The Contract Documents. Iii. The Contractor Shall Submit A Detailed Program Of Works Within Fourteen (14) Calendar Days After The Issuance Of The Notice To Proceed (ntp) For Approval By The Head Of The Procuring Entity (hope) That Shall Include, Among Others: A. The Order In Which It Tends To Carry Out The Work Including Anticipated Timing For Each Stage Or Design/detailed Engineering And Construction; B. Periods For Review Of Specific Outputs And Any Other Submissions And Approvals; C. Sequence Of Timing For Inspection And Tests; D. General Description Of The Design And Construction Methods To Be Adopted; E. Number Of Personnel To Be Assigned For Each Stage Of The Work; F. List Of Equipment Required On Site For Each Stage Of The Work; And G. Description Of The Quality Control System To Be Utilized For The Project. Iv. Any Errors, Omissions, Inconsistencies, Inadequate Or Failure Submitted By The Contractor That Do Not Comply With The Requirements Shall Be Rectified, Resubmitted And Reviewed At The Contractor’s Cost. If The Contractor Wishes To Modify Any Design Or Document Which Has Been Previously Submitted, Reviewed And Approved, The Contractor Shall Notify The Implementing Unit Within A Reasonable Period Of Time And Shall Shoulder The Cost Of Such Changes. V. As A Rule, Changes In Design And Construction Requirements Shall Be Limited Only To Those That Have Not Been Anticipated In The Contract Signing And Approval. The Following Guidelines Shall Govern Approval For Change Or Variation Order: A. Change Orders Resulting From Design Errors, Omissions Or Non-conformance With The Performance Specifications And Parameters And The Contract Documents By The Contractor Shall Be Implemented By The Contractor At No Additional Cost To The Bucor. B. Provided That The Contractor Suffers Delay And/or Incurs Costs Due To Changes Or Errors In The Preparation Of Performance Specification And Parameters, The Contractor Shall Be Entitled To Either One Of The Following: An Extension Of Time For Any Such Delays Under Section 10 Of Annex “e” Of Irr-a (ra9184; Or Payments For Such Cost As Specified In The Contract Documents, Provided That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. C. The Contract Documents Shall Include The Manner And Schedule Of Payment Specifying The Estimated Contract Amount And Installments In Which The Contract Will Be Paid. D. The Contractor Shall Be Entitled To Advance Payment Subject To The Provisions Of Section 4 Of Annex “e” Of The Revised Irr Of Ra 9184. E. The Implementing Unit Shall Monitor The Quality Control Procedures For The Design And Construction In Accordance With The Government Guidelines And Shall Issue The Proper Certificates Of Acceptance For Sections Of The Works Or Whole Of The Works As Provided For In The Contract Documents. F. The Contractor Shall Provide All Necessary Equipment, Personnel, Instruments, Documents And Others To Carry Out Specified Tests. G. This Design And Build Project Shall Have Minimum Defects Liability Period Of One (1) Year Contract Completion Or As Provided In The Contract Documents. This Is Without Prejudice To The Liabilities Imposed Upon The Engineer/architect Who Drew Up The Plans And Specification For A Building Sanctioned Under Section 1723 Of The New Civil Code Of The Philippines. H. The Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Of 15 Years For Permanent Structures/buildings And 5 Years For Roads As Specified In Section 62.2.2 Of The Revised Irr Of Ra 9184. V. As-built Plans. The Contractor Shall Cause The Preparation And Submission Of As-built Plans Duly Signed And Sealed By All Concerned Parties Involved In The Construction In The Same Sheet Size And Scale As The Original Drawings In One (1) Blue Print Copy And One (1) Reproducible Copy. Vi. General Requirements: 1. Temporary Facilities Such As Field Offices For The Bucor Inspectorate Team, Project Engineers And Quarters For Laborers; Temporary Warehouse For The Construction Material. 2. Office Furniture And Equipment, Survey Equipment And Consumables 3. Photographs: This Item Consists Of The Supply Of Equipment And Materials, I.e., Album, Necessary To Undertake Photographic Progress Activities Of The Project And Of All Cost Incidental To The Preparation And Submission Of Photographs (at Least 12 Photographs Per Day). The Quantities For Photographs Shall Be One (1) Set Of Photographs Per Month. 4. Minimum Heavy Equipment Requirement (as Needed) For Site Development Such As: No. Item Specification 1. Backhoe 0.8 Cu. M. 2. Backhoe Wheel Mounted With Breaker 0.90 Cu. M. 3. Cargo/service Truck 2-5 Mt., 160 Hp 4. Dump Truck 12 Cu. Yd. 5. Motorized Road Grader G710a, 140hp 6. Payloader 1.5 Cu. M. 7. Vibrator Roller 10 Mt 8. Bulldozer 170 Hp 9. Scraper 515 Hp 10. Truck Mounted Crane, Hydraulic Telescopic Bommer Capacity: 41 – 45 Mt. 11. Crawler Crane 41-45 Mt 12. Generator Set 300 Kw/375 Kva 13. Water Pump 100mm Suction Dia. 14. One Bagger Mixer 4-6 Ft3/min 15. Concrete Vibrator Ey20, 5hp, 32-70mm 16. Vibro Hammer 45000 Kg-m 17. Excavator 17.5 Kw Or Any Specify Types Of Heavy Equipment Needed For A Site Development Will Be Determined By The Winning Bidder. 5. Health And Safety Program Including Personal Protective Equipment (ppe) A. All Standard Safety Measures And Precautions Shall Be Exercised By The Contractor In The Course Of The Project For The Protection Of The Public And Its Workers And In Conformity With Dole Department Order No. 13, Series Of 1998. B. All Workers Shall Be Equipped With Proper Working Uniform And Identification At All Times. They Must Be Registered With The Governing Bucor Security Office And Must Comply With The Bucor’s Rules And Regulations. C. The Contractor Shall Secure His/her Own Equipment And Materials On Site. The Bucor Shall Not Be Liable To Any Losses Incurred During The Progress Of The Work. 6. Environmental Compliance 7. Communication Equipment: This Item Consists Of The Provision Of Communication Equipment. 8. Billboard 9. Traffic Management (if Applicable). Vii. Building Construction 1 Unit One (1) Unit Two (2) Storey Type B Dormitory(22x79) With 350 Pdl Capacity With Standard Livable Area Of 4.7sqm Per Pdl And A Maximum Capacity Of 10 Psdl Per Cell- Ra 10575. 1 Lot Fire Protection System (fire & Jockey Pump, Pump House), Fire Detection Alarm System And Fire Suppression Equipment To Dormitory In Accordance To Governing Laws And Regulations Requirements 1 Lot Sanitary And Plumbing Systems: Sewerage And Drainage System (from Point Of Source To Project Site) 1 Unit Main Security Gate 1 Lot Site Development. Includes Not Limited To The Following: Stormwater Management: Implementing Systems To Manage Stormwater Runoff, Which Include Underground Drainage Systems. ( Planning, Designing And Installing Pipes, Channels, Culverts, Ditches, And Other Structures That Collect, Convey, And Discharge Storm Water Runoff). Drainage Outfall To Connect To Existing Nearest Drainage Line. Shall Conform To Existing Rules And Regulations Of The Lgu. Grading And Earthwork: Leveling The Ground And Shaping It To The Required Specifications For The Construction Project. This May Involve Excavation, Filling And Compacting Soil. 180 Units 1x2x2m Double Decker Bed Bunks With 350 Psdl Capacity (design And Specification Of Bunk Beds For Review Of Planning And Design Division-pdd) 1 Lot Water Supply System. Includes The Ff: Water Source, Storages, And Distribution Line. Sufficient Pressure To Provide Supply Outpost Plumbing Fixtures, Cistern Tank, Pumps, And Overhead Water Tank (from Point Of Source To Project Site). 1 Lot Electrical System: Three-phase Power Line Supply ( Designed To Supply The Entire Compound Including The Future Developments) Connected From Electric Local Utility To Security Compound (project Site) 1 Lot Electrical System: Backup Power Supply System With Capacity Not Less Than The Total Computed Mva Load, Without Demand Factor, (designed To Supply The Entire Compound Including The Future Developments.) 1 Lot (391 Ln.m More Or Less) Secondary Perimeter (see Rule Vii Of Revised Irr R.a. 10575) With 300w Integrated Solar Lights Every 3 Bays And (to Include Post Towers And Gates). Double Layer Perimeter Fence: Concertina/barb Wire Steel Matting Fence 1 Unit Admin/security Office To Cover At Least 68.2sqm In Standard Finish. 1 Lot Cctv Systems (perimeter Fence And Inside Compound And Dormitory Hallway) A. Material Specifications: A. Floor Finishes • Polished Cement Finish Prison Cell, Hallways, Staircases, And Rooms • Plain Cement Finish - Pathways. • Ramps - Anti Slip Pavers Or Tiles • Crs – Unglazed Ceramic Tiles B. Wall Finishes A. Glazed Wall Tiles - 1.8m Height. B. Plain Cement Plaster Finish - For All Buildings And Facilities C. Ceiling Finishes C. Concrete Steel Decking, If Applicable. – Coated In White Enamel D. Painting D. Semi-gloss Solvent Paint Top Coat (high-end Quality) For Interior And Exterior Walls In Two To Three Coats Application. Apply Concrete Neutralizer For Newly Finished Concrete Surfaces. Use Solvent Primer. E. Varnish Paint Finish With Weather Proof Coating – For Doors And Jambs Branded, High-end Quality (offices, Etc.), All Wooden Doors Must Have Secondary Steel Doors. F. Use Epoxy Paint Primer. Epoxy Paint Finish – For Structural Steel And All Metal Works E. Doors And Windows G. No Doors For Prison Facility Comfort Rooms With 1.20 Meter Finish Wall Height (see Rule Vii, Section 7 R-irr Of Ra 10575). H. Steel Doors And Grills – For Dormitories, Gates And Other Security Areas. Sliding Doors For All Cells (see Rule Vii, Section 7 R-irr Of Ra 10575) F. Waterproofing I. Uv Resistant Polyurethane Waterproofing – For All Roof Deck With Topping Works Provided With Welded Wire Mesh. (at Elevated Water Tank Area) J. Cistern - Polyurethane Waterproofing G. Plumbing Works K. Upvc Pipe Series 1000 – For All Soil, Sewer, Waste, Dry And Wet Vent Piping High-end Quality L. Pprc Fusion Type – For All Water Lines High-end Quality M. Contractor Encouraged To Adapt: Lpf Flush Valve For Water Closet Or Stainless Toilet-lavatory Combination. Waterless Urinals N. Contractor To Provide A Water System To Supply The Facility 4. Approved Budget For The Contract (abc) The Approved Budget For The Contract (abc) Is Php 180,000,000.00. This Is The Ceiling For Acceptable Bids. Bids Higher Than Abc Shall Be Automatically Rejected. 5. Proposed Implementation Schedule (example): No. Of Months 1 2 4 5 6 7 8 9 10 11 12 Design Phase Construction Phase 6. Eligibility Criteria For Bidders 6.1 General The Eligibility Requirements For This Design And Build Project Shall Adopt The Provisions Of Annex “g” Of The Implementing Rules And Regulations Of Ra 9184 (e.g. Eligibility Requirement). However, If A Bidder Who Has No Experience In Db Project On Its Own May Opt To Enter A Subcontracting Agreement, Partnership, Or Joint Venture With A Design Or Engineering Firm For The Design Portion Of The Project. 6.2 Legal Requirements A. Valid Contractor’s License Issued By The Philippine Contractor’s Accreditation Board B. Valid License Of The Contractor’s Designer Issued By The Professional Regulation Commission. 6.3 Technical Requirements A. The Contractor’s Designer Must Have Designed One Structure Similar To The Project At Hand With A Construction Cost Of At Least 50 % Of The Abc. 6.4 Financial Requirements The Contractor Must Have A Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc To Be Bid Or Equivalent To Php180, 000,000.00. 7. Contents Of The Bid 7.1 In The First Envelope Class “a” Documents Legal Documents I. Philgeps Certificate Of Registration And Membership In Accordance With Section 8.5.2 Of This Irr. For Procurement To Be Performed Overseas, It Shall Be Subject To The Guidelines To Be Issued By The Gppb. (a) Ii. Pcab License And Registration, In Case Of Jv; 57 Iii. Statement Of All Ongoing Government And Private Contracts; Iv. Statement Of Slcc; V. Nfcc Computation; Vi. Jva, If Applicable; Vii. Bid Security In The Prescribed Form, Amount And Validity Period; Viii. Project Requirements, Which Shall Include The Following: 1. Organizational Chart For The Contract To Be Bid; 2. List Of Contractor’s Personnel (design And Construction), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; 3. List Of Contractor’s Equipment Units Which Are Owned, Leased And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From Lessor/vendor For The Duration Of The Project. Ix. Omnibus Sworn Statement By The Prospective Bidder Or Its Authorized Representative In The Prescribed Format; X. Submission Of Preliminary Conceptual Design Plans: Class “b” Documents I. For Infrastructure Projects, Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And It’s Irr. Ii. Each Partner Of The Joint Venture Shall Submit Their Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. 1. Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) A. Location Plan/vicinity Map B. Perspective C. Floor Plans D. Front View Elevation E. Rear View Elevation F. Left Side View Elevation G. Right Side View Elevation H. Longitudinal Section I. Transverse Section 2. Design And Construction Method 3. List Of Contractor’s Personnel To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc), Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; For Design The Key Professionals And The Respective Qualifications Of The Design Personnel Shall Be As Follows: • Principal Architect The Principal Architect Must Be Duly-licensed With At Least Ten (10) Years’ Experience In The Design Of Residential, Government Offices Or Institutional Facilities, And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Structural Engineer The Structural Engineer Must Be A Duly-licensed Civil Engineer With At Least Ten (10) Years’ Experience In Structural Design And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Professional Electrical Engineer The Electrical Engineer Must Be A Registered Professional Electrical Engineer With At Least Five (5) Years’ Experience In The Design Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems And Preferably Knowledgeable In Developments In Emergent Efficient Lighting Technologies And Energy Management. • Professional Mechanical Engineer The Mechanical Engineer Must Be A Professional Mechanical Engineer With At Least Five (5) Years In Hvac And Fire Protection Systems And Preferably Knowledgeable In Emergent, Alternative Energy- Efficient Hvac Technologies. • Electronics And Communications Engineer The Electronics And Communications Engineer Must Be Duly-licensed With At Least Ten (5) Years’ Experience In The Design Of Communications Systems, And Preferably Knowledgeable In The Application Of Building Automation And Surveillance Systems. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In The Design Of Building Water Supply And Distribution, Plumbing, And Preferably Knowledgeable In Waste Water Management/treatment, And Emergent, Alternative Effluent Collection And Treatment System. The Design & Build Contractor May, As Needed And At Its Own Expense, Add Additional Professionals And/or Support Personnel For The Optimal Performance Of All Architectural And Engineering Design Services, As Stipulated In These Terms Of Reference, For The Project. Prospective Bidders Shall Attach Each Individual’s Resume And Prc License Of The (professional) Staff. Design Personnel May Also Be Utilized For The Construction Phase Provided That The Same Meet The Minimum Number Of Years Of Experience In The Construction Of Similar Projects. For Construction Personnel The Key Professionals And The Respective Qualifications Of The Construction Personnel Shall Be As Follows: • Project Manager The Project Manager Shall Be A Licensed Architect Or Engineer With At Least Eight (8) Years Relevant Experience On Similar And Comparable Projects In Different Locations. The Project Manager Should Have A Proven Record Or Managerial Capability Through The Directing/managing Of Major Civil Engineering Works, Including Projects Of A Similar Magnitude. • Project Architect/engineer The Project Architect/engineer Shall Be A Licensed Architect Or Engineer With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Materials Engineer (m.e. I) The Materials Engineer Must Be Duly Accredited With The Dpwh And With At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Electrical Engineer The Electrical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Lighting, Power Distribution, Communication Systems (specifically Structured And Local Area Network Cabling, Pabx), Building Management Systems. • Mechanical Engineer The Mechanical Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Hvac And Fire Protection. • Sanitary Engineer The Sanitary Engineer Must Be Duly-licensed With At Least Five (5) Years’ Experience In Similar And Comparable Projects In The Installation Of Building Water Supply And Distribution, Plumbing. • Foreman The Foreman Must Have At Least Five (5) Years’ Experience In Similar And Comparable Projects And Shall Preferably Be Knowledgeable In The Application Of Rapid Construction Technologies. • Safety Officer The Safety Officer Must Be An Accredited Safety Practitioner By The Department Of Labor And Employment (dole) And Must Have Undergone The Prescribed Forty (40) Hour Construction Safety And Health Training (cosh) And Must Have At Least Two (2) Years’ Experience. 4. Value Engineering Analysis Of Design And Construction. The Second Envelope (financial Proposal) Shall Contain All The Required Documents For Infrastructure Projects Under Section 25.38 Of The Irr Of R.a 9184. 7.2 In The Second Envelope – Financial Proposal The Contents Of Financial Proposal – In The Second Envelope Shall Be Governed By Section 6.1 Design And Build Scheme Of The Dpwh Procurement Manual Volume Ii - Infrastructure Main Guidelines (2016). A. Lump Sum Bid Prices, Which Shall Include The Detailed Engineering Cost, In The Prescribed Bid Form Inclusive Of Vat B. Detailed Estimates Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals Used In Coming Up With The Bid For The Following: I Detailed Architectural And Engineering Design; Ii Demolition Works; And Iii Building Construction/civil Works. C. Bill Of Quantities D Cash Flow And Payments Schedule. 8. Procedure And Criteria For Bids Evaluation For The Detailed Evaluation Of The Design And Build Proposals A Two-step Procedure Shall Be Adopted By The Bac, Which May Be Undertaken With The Assistance Of The Dbc. First-step Procedure: With The Assistance Of The Bucor Design And Build Committee (bucor-dbc), The Bac Shall Conduct The Opening, Preliminary Examination And Detailed Evaluation Of The Design And Build Proposals, As Follows: (1) The First Step Of The Evaluation Shall Involve The Review Of The Preliminary Conceptual Designs And Track Record Submitted By The Contract As Indicated In The Bidding Documents Using A Nondiscretionary “pass/fail” Criterion That Involve Compliance With The Following Requirements: A. Performance Specifications And Parameters And Degree Of Details; B. Adherence Of Preliminary Design Plans To The Required Concept Of Approach And Methodology For Detailed Engineering, Design And Construction With Emphasis On The Clarity, Feasibility, Innovativeness And Comprehensiveness Of The Plan Approach, And The Quality Of Interpretation Of Project Problems, Risks, And Suggested Solutions; And C. Quality Of Personnel To Be Assigned To The Project Which Covers Suitability Of Key Staff To Perform The Duties Of The Particular Assignments And General Qualifications And Competence Including Education And Training Of The Key Staff. 8.1 Merit Point Critera For The Bid Evaluation 8.1.1 Adherence To Performance Specifications (35 Points) A. Compliance And Adherence To Specifications: Excellent Compliance (100 Points): The Submission Fully Adheres To All Specified Project Requirements And Regulations, Demonstrating Meticulous Attention To Detail And Comprehensive Understanding Of The Tor. All Drawings And Documentation Are Accurate, Complete, And In Compliance With Relevant Standards. Good Compliance (80 Points): The Submission Largely Complies With Project Specifications And Regulations, With Minor Discrepancies. Drawings And Documentation Are Mostly Accurate And Complete, Meeting The Majority Of Requirements. Acceptable Compliance (70 Points): The Submission Satisfies Most Of The Specified Requirements And Regulations, Albeit With Some Notable Omissions Or Inconsistencies. Drawings And Documentation Are Generally Accurate And Complete, Meeting The Basic Expectations. Some Reservations (50 Points): The Submission Partially Meets The Specified Requirements And Regulations, With Several Notable Deficiencies Or Inconsistencies. There Are Significant Gaps Or Inaccuracies In The Drawings And Documentation, Raising Concerns About Compliance. Serious Reservations (20%) The Submission Falls Significantly Short Of Meeting The Specified Requirements And Regulations, With Major Deficiencies Or Inconsistencies. Drawings And Documentation Lack Essential Details Or Fail To Comply With Key Standards, Casting Doubt On The Bidder's Understanding Of The Project Scope. Unacceptable (0%) The Submission Fails To Comply With The Specified Requirements And Regulations, Lacking Essential Details And Demonstrating A Fundamental Misunderstanding Of The Project Scope. Drawings And Documentation Are Incomplete Or Inaccurate, Indicating A Lack Of Capability To Deliver The Project On Time. B. Functionality And Efficiency: Excellent (100%): The Design Optimally Utilizes Space, Facilitating Efficient Accommodation Of 500 Psdl. Layout And Design Enhance Operational Flow, Demonstrating Exceptional Foresight And Planning. Integration Of Facilities Promotes Smooth Prison Management. Good (80%): The Design Effectively Utilizes Space, With Minor Areas For Improvement In Operational Flow. Layout And Design Contribute To Efficient Prison Management, Meeting Most Functional Requirements. Acceptable (70%): The Design Adequately Utilizes Space, Meeting Basic Requirements For Accommodating 500 Psdl. Layout And Design Support Operational Flow, Though Some Improvements Are Needed For Optimal Functionality. Some Reservations (50%): The Design Partially Optimizes Space Utilization, With Notable Deficiencies In Operational Flow. Layout And Design Hinder Efficient Prison Management, Requiring Significant Adjustments For Improvement. Serious Reservations (20%): The Design Inadequately Utilizes Space, Hindering Accommodation Of 500 Psdl. Layout And Design Severely Impede Operational Flow, Indicating A Lack Of Understanding Of Functional Requirements. Unacceptable (0%): The Design Fails To Optimize Space Utilization, Lacking Consideration For Accommodating 500 Psdl. Layout And Design Pose Significant Obstacles To Efficient Prison Management, Indicating A Fundamental Misunderstanding Of Functional Requirements. C. Sustainability And Environmental Considerations: Excellent (100%): The Design Includes Robust Safety Measures And Emergency Protocols, Ensuring The Safety And Well-being Of Psdl And Staff In Accordance With Ra 10575. Good (80%): The Design Integrates Sustainable Design Principles Effectively, With Minor Opportunities For Improvement In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Adequate, Supporting Environmental Sustainability. Acceptable (70%) The Design Includes Basic Sustainable Design Principles, Meeting Minimum Requirements For Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Are Functional, Contributing To Environmental Sustainability. Some Reservations (50%): The Design Partially Incorporates Sustainable Design Principles, With Notable Deficiencies In Energy Efficiency And Material Selection. Sewage Treatment And Water Conservation Measures Lack Comprehensiveness, Limiting Environmental Sustainability. Serious Reservations (20%): The Design Lacks Consideration For Sustainable Design Principles, Neglecting Energy Efficiency And Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Insufficient, Undermining Environmental Sustainability. Unacceptable (0%): The Design Disregards Sustainable Design Principles, Showing No Commitment To Energy Efficiency Or Eco-friendly Materials. Sewage Treatment And Water Conservation Measures Are Absent Or Inadequate, Disregarding Environmental Sustainability. D. Aesthetics And Architectural Design: Excellent (100%): The Design Exhibits Exceptional Aesthetic Appeal And Architectural Coherence, Showcasing Innovative And Visually Pleasing Elements. Consideration Of Local Architectural Vernacular And Contextual Integration Is Evident, Contributing To The Overall Excellence Of The Design. Good (80%): The Design Demonstrates Good Aesthetic Appeal And Architectural Coherence, With Some Areas For Enhancement In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Apparent, Enriching The Design. Acceptable (70%): The Design Achieves Acceptable Aesthetic Appeal And Architectural Coherence, Meeting Basic Expectations For Visual Presentation. Consideration Of Local Architectural Vernacular And Contextual Integration Is Present, Though Limited In Scope. Some Reservations (50%): The Design Lacks Significant Aesthetic Appeal And Architectural Coherence, With Notable Deficiencies In Creativity And Visual Impact. Consideration Of Local Architectural Vernacular And Contextual Integration Is Minimal, Detracting From The Overall Quality Of The Design. Serious Reservations (20%): The Design Exhibits Poor Aesthetic Appeal And Architectural Coherence, Failing To Engage Visually Or Inspire Interest. Consideration Of Local Architectural Vernacular And Contextual Integration Is Lacking, Diminishing The Design's Relevance And Appropriateness. Unacceptable (0%): The Design Lacks Any Aesthetic Appeal Or Architectural Coherence, Showing No Effort To Engage Visually Or Integrate With The Local Architectural Vernacular. Consideration Of Contextual Integration Is Absent, Rendering The Design Unsuitable For The Project. 8.1.2 Approach And Methodology For Detailed Engineering, Design, And Construction (40 Points) Excellent (100%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Exceptionally Clear, Feasible, Innovative, And Comprehensive. The Plan Demonstrates A High Level Of Understanding Of Project Problems, Risks, And Suggested Solutions, With Well-defined Strategies For Addressing Them. Good (80%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Clear, Feasible, And Comprehensive, With Some Innovative Elements. The Plan Adequately Addresses Project Problems, Risks, And Suggested Solutions, Though Some Areas May Require Further Development. Acceptable (70%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Satisfactorily Addresses Project Requirements, With A Basic Level Of Clarity And Feasibility. The Plan Outlines Strategies For Addressing Project Problems, Risks, And Suggested Solutions, Meeting The Minimum Expectations. Some Reservations (50%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Partially Addresses Project Requirements, With Notable Gaps In Clarity And Feasibility. The Plan Lacks Innovative Elements And May Inadequately Address Project Problems, Risks, And Suggested Solutions. Serious Reservations (20%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Demonstrates Significant Deficiencies In Clarity, Feasibility, And Comprehensiveness. The Plan Fails To Adequately Address Project Problems, Risks, And Suggested Solutions, Indicating A Lack Of Understanding Or Inadequate Planning. Unacceptable (0%): The Concept Of Approach And Methodology For Detailed Engineering, Design, And Construction Is Unclear, Infeasible, And Lacks Comprehensiveness. The Plan Fails To Address Project Problems, Risks, And Suggested Solutions, Indicating A Fundamental Misunderstanding Or Disregard For Project Requirements. 8.1.3 Quality Of Personnel Assigned To The Project (25 Points) Excellent (100%): The Personnel Assigned To The Project, Including Key Staff, Are Highly Suitable And Competent To Perform Their Duties. Key Staff Members Possess Exceptional Qualifications, Competence, Education, And Training Relevant To Their Roles, Demonstrating A High Level Of Expertise And Experience. Good (80%): The Personnel Assigned To The Project, Including Key Staff, Are Suitable And Competent To Perform Their Duties Effectively. Key Staff Members Possess Relevant Qualifications, Competence, Education, And Training, Demonstrating Solid Expertise And Experience. Acceptable (70%): The Personnel Assigned To The Project, Including Key Staff, Meet The Basic Requirements For Suitability And Competence In Performing Their Duties. Key Staff Members Possess General Qualifications And Competence, Education, And Training Relevant To Their Roles, Meeting The Minimum Expectations. Some Reservations (50%): The Personnel Assigned To The Project, Including Key Staff, Demonstrate Some Suitability And Competence In Performing Their Duties, But Notable Deficiencies Are Present. Key Staff Members May Lack Certain Qualifications, Competence, Education, Or Training, Raising Concerns About Their Ability To Effectively Fulfill Their Roles. Serious Reservations (20%): The Personnel Assigned To The Project, Including Key Staff, Exhibit Significant Deficiencies In Suitability And Competence To Perform Their Duties. Key Staff Members Lack Essential Qualifications, Competence, Education, Or Training, Indicating A Lack Of Expertise Or Experience Relevant To Their Roles. Unacceptable (0%): The Personnel Assigned To The Project, Including Key Staff, Are Unsuitable And Incompetent To Perform Their Duties Effectively. Key Staff Members Lack The Necessary Qualifications, Competence, Education, And Training, Demonstrating A Fundamental Mismatch With The Requirements Of Their Roles. 8.2 Determination Of The Merit Point Score The Aggregate Of The Scores In Each Criterion Must Be 70% Or More To Pass Using The Following Formula In Equation. Description Weight (w) Rating (r) Criteria 1 35% (smax/sact) Criteria 2 40% Sact Criteria 3 25% Sact Smax = Η (100) Sact = R1 +r2 +r3 + . . .(rη) Where Η = Number Of Sub Criteria R = Rating Given To The Criteria/sub Criteria The Actual Score (sact) For Each Of The Criteria/sub Criteria Is Obtained By Adding All The Given Rating. (smax) Is The Summation Of Maximum Score Per Criteria 8.3 Passing Rate The Specific Passing Rate Value Depends On The Specific Context Of The Project, The Priorities Of The Design And Build Committee, And The Complexity Of The Requirements Outlined In Ra 10575. Based On The Provided Criteria And Descriptions, The Passing Rate For The Merit Point Criteria (mpc) Could Be Set At 75%. This Means That Bidders Must Score At Least 75% Or Higher In The Evaluation Process To Be Considered As Meeting The Minimum Requirements For The Project A. Pass Rate Per Criteria Will Be Determined Using The Formula: Score = W1*r1 + W2*r2 + W3*r3 B. A Bid Or Technical Bid That Failed In Any Of The Criteria’s Will Not Be Considered For Further Evaluation C. Score Above 75% Will Be Considered As Technically Responsive. Aggregate Score Of Less Than 75% Will Be Considered Failed, And May Be Rejected On That Basis. Second-step Procedure: Only Those Bids That Passed The Above Criteria Shall Be Subjected To The Second Step Of Evaluation. The Bac Shall Open The Financial Proposal Of Each “passed” Bidder And Shall Evaluate It Using Non-discretionary Criteria – Including Arithmetical Corrections For Computational Errors – As Stated In The Bidding Documents, And Thus Determine The Correct Total Calculated Prices. The Bac Shall Automatically Disqualify Any Total Calculated Bid Price Which Exceeds The Abc 9. Data To Be Provided By The Bucor These Data Are For Reference Only And Does Not Guarantee The Contractor That The Data Provided Are Correct, Free From Error, And Applicable To The Project At Hand. The Contractor Is Responsible For The Accuracy Or Applicability Of Any Data That He Will Use In His Design– Build Proposal And Services. Sample Data For Buildings: A. Conceptual Plans 10. Documents To Be Provided By The Contractor During Contract Implementation A. Detailed Architectural And Engineering Plans B. Design Analysis C. Survey Data D. Quantity Calculation E. Detailed Geotechnical Investigation Report F. Design Report. G. As-built Plans, (printed Including Cad Files And Bim Files (lod 500) H. Other Relevant Documents 11. Design And Build Period The Winning Bidder Shall Commence Actual Works Upon The Issuance By The Bucor Of The Notice To Proceed (ntp). The Winning Bidder Shall Complete The Daed And Submit Within The Ninety (60) Calendar Days (cds) Period To The Bucor For Review And Approval. The Contractor Shall Complete The Construction Of The Building Within 305 Cds For The Total Contract Duration Of 365 Cd. Conforme: Name Of Company In Print Signature Over Printed Name Of Authorized Representative/date Section Vii. Drawings The Conceptual Drawings Should Be Attached To This Section Or Annexed In A Separate Folder As Part Of The First Envelope (technical Component Envelope). Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: At Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 1. Location Plan/vicinity Map 2. Perspective 3. Floor Plans 4. Front View Elevation 5. Rear View Elevation 6. Left Side View Elevation 7. Right Side View Elevation 8. Longitudinal Section 9. Transverse Section Section Viii. Bill Of Quantities The Bill Of Quantities Should Be Attached To This Section As Part Of The Second Envelope (financial Component Envelope). Section Ix. Checklist Of Technical And Financial Documents Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (d) Special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid With Their Complete Qualification And Experience Data And Photocopy Of Their Valid Licenses Issued By The Professional Regulatory Commission (prc) And Curriculum Vitae Of Key Staff, Partners Or Principal Officers With A Minimum Work Experience Requirements Set In The Bds; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate Or Board Resolution/partnership Resolution In Case Of A Corporation, Partnership, Or Cooperative; Or Original Notarized Special Power Of Attorney In Case Of Sole Proprietorship Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. And ⬜ (h) Conformity With The Technical Specifications (scope Of Work); And ⬜ (i) Preliminary Conceptual Architectural Design Plans In Accordance With The Degree Of Details Specified By The Procuring Entity: (at Suitable Scale On High Quality A3 Blue Print Paper /digital Print Minimum Size) 1. Location Plan/vicinity Map 2. Perspective 3. Floor Plans 4. Front View Elevation 5. Rear View Elevation 6. Left Side View Elevation 7. Right Side View Elevation 8. Longitudinal Section 9. Transverse Section ⬜ (j) Design And Construction Method And ⬜ (k) Value Engineering Analysis Of The Design And Construction Method. And Financial Documents ⬜ (l) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. And Class “b” Documents ⬜ (m) Jv Bidders Shall Submit A Jva In Accordance With R.a. 4566 And Its Irr. Each Partner Of The Joint Venture Shall Submit Their Respective Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements. Ii. Financial Component Envelope ⬜ (n) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (o) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (p) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (q) Cash Flow And Payment Schedule. Bidding Form Company Letterhead Statement Of Ongoing Government & Private Contracts Design And Build Of One (1) Unit 2-storey Dormitory At Curuan, Zamboanga Statement Of All Its Ongoing Government And Or Private Contracts Including Contracts Awarded But Not Yet Started, If Any Whether Similar Or Not Similar In Nature. Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Date Of Completion Or Estimated Completion Time Value Of Outstanding Works Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Statement Of Single Largest Completed Contract Design And Build Of One (1) Unit 2-storey Dormitory At Curuan, Zamboanga Statement Of Single (1) Largest Completed Contract Of Similar In Nature Within The Last Six (6) Years From The Date Of Submission And Receipt Of Bids Amounting To At Least Fifty Percent (50%) Of The Approved Budget Of The Contract (abc) Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Nature Of Work Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation Total Contract Value At Award Date Of Completion Or Estimated Completion Time Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Design And Build Of One (1) Unit 2-storey Dormitory At Curuan, Zamboanga Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: Bureau Of Corrections I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. ______________________________________________________ [insert Name Of Bidder’s Authorized Representative] _____________________________ [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ Issued On ______________ At ___________________________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Omnibus Sworn Statement Design And Build Of One (1) Unit 2-storey Dormitory At Curuan, Zamboanga _________________________________________________________________________ Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of One (1) Unit 2-storey Dormitory At Curuan, Zamboanga Of The Bureau Of Corrections, As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Design And Build Of One (1) Unit 2-storey Dormitory At Curuan, Zamboanga Of The Bureau Of Corrections, As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The Design And Build Of One (1) Unit 2-storey Dormitory At Curuan, Zamboanga. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 2024 At ____________, Philippines_____________________________________ Bidder’s Representative/authorized Signatory Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ And Issued On ____________________ At _____________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Certificate Of Net Financial Contracting Capacity Design And Build Of One (1) Unit 2-storey Dormitory At Curuan, Zamboanga (please Show Figures At How You Arrived At The Nfcc) This Is To Certify That Our Net Financial Contracting Capacity (nfcc) Is _____________________ (p____________) Which Is At Least Equal To The Total Ceiling Price We Are Bidding. The Amount Is Computed As Follows: (please Show Computation Of Nfcc) Nfcc = (ca-cl) (15) – C Where: Ca = Current Assets Cl = Current Liabilities C = Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Going Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project Note: The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Audited Financial Statement Submitted To The Bir. Issued This _________________day Of ________________, 2024 _______________________________________________ Name & Signature Of Authorized Representative ____________________ Position _______________ Date Company Letterhead Bid Form Date: Ib No: To Bids And Awards Committee Bureau Of Corrections Nbp Reservation Muntinlupa City We, The Undersigned, Declare That: (a) We Have Examined And Have No Reservation To The Bidding Documents, Including Addenda, For The Contract Design And Build Of One (1) Unit 2-storey Dormitory At Curuan, Zamboanga; (b) We Offer To Execute The Works For This Contract In Accordance With The Bid And Bid Data Sheet, General And Special Conditions Of Contract Accompanying This Bid; The Total Price Of Our Bid, Excluding Any Discounts Offered Below Is: ________________________________________₱_________________; The Discounts Offered And The Methodology For Their Application Are: [insert Information]; (c) Our Bid Shall Be Valid For A Period Of 120 Calendar Days From The Date Fixed For The Bid Submission Deadline In Accordance With The Bidding Documents, And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period; (d) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of 30% Percent Of The Contract Price For The Due Performance Of The Contract; (e) Our Firm, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Have Nationalities From The Following Eligible Countries; (f) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (g) Our Firm, Its Affiliates Or Subsidiaries, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Has Not Been Declared Ineligible By The Funding Source; (h) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (i) We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Other Bid That You May Receive. (j) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Design And Build Of One (1) Unit 2-storey Dormitory At Curuan, Zamboangaof The Bureau Of Corrections. (k) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be A Ground For The Rejection Of Our Bid. Name: In The Capacity Of: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________
Closing Soon30 Dec 2024
Tender AmountPHP 180 Million (USD 3 Million)
Department Of National Defence Tender
Others
Canada
Description: File Number: W8476-256986/a Notice Of Proposed Procurement The Department Of National Defence Has A Requirement For The Items Detailed Below. The Delivery Is Requested At 25cfsd Montreal And 7cfsd Edmonton By March 4th , 2025. Item 1, Gsin: 5325, Nsn: 5325 33 205 9306 Ring, Retaining P/n Requested: 2004780 Nscm/cage: 0848b Quantity: 30 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 2, Gsin: 5325, Nsn: 5325 33 205 9306 Ring, Retaining P/n Requested: 2004780 Nscm/cage: 0848b Quantity: 30 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 3, Gsin: 5360, Nsn: 5360 33 202 1304 Spring, Helical, Extension P/n Requested: 2007800 Nscm/cage / Cof/cage: 0848b Quantity: 30 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 4, Gsin: 5360, Nsn: 5360 33 202 1304 Spring, Helical, Extension P/n Requested: 2007800 Nscm/cage / Cof/cage: 0848b Quantity: 30 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 5, Gsin: 5330, Nsn: 5330 12 175 2642 Seal Plain P/n Requested: Babsl60x80x7/7,5-72nbr/902 Nscm/cage / Cof/cage: D2480 Quantity: 15 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 6, Gsin: 5330, Nsn: 5330 12 175 2642 Seal Plain P/n Requested: Babsl60x80x7/7,5-72nbr/902 Nscm/cage / Cof/cage: D2480 Quantity: 15 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 7, Gsin: 3110, Nsn: 3110 12 164 8047 Bearing, Roller, Tapered P/n Requested: 32009-xa Nscm/cage / Cof/cage: D2456 Quantity: 20 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 8, Gsin: 3110, Nsn: 3110 12 164 8047 Bearing, Roller, Tapered P/n Requested: 32009-xa Nscm/cage / Cof/cage: D2456 Quantity: 20 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 9, Gsin: 2530, Nsn: 2530 99 780 7800 Steering Wheel P/n Requested: 294745-003 Nscm/cage / Cof/cage: U1607 Quantity: 2 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 10, Gsin: 2530, Nsn: 2530 99 780 7800 Steering Wheel P/n Requested: 294745-003 Nscm/cage / Cof/cage: U1607 Quantity: 2 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 11, Gsin: 4730, Nsn: 4730 12 395 7588 Elbow, Tube P/n Requested: Wee10lromdcf Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 12, Gsin: 4730, Nsn: 4730 12 395 7588 Elbow, Tube P/n Requested: Wee10lromdcf Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 13, Gsin: 4730, Nsn: 4730 33 107 9371 Adapter, Straight, Tube To Boss P/n Requested: 4730700014 Nscm/cage / Cof/cage: 0125b Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 14, Gsin: 4730, Nsn: 4730 33 107 9371 Adapter, Straight, Tube To Boss P/n Requested: 4730700014 Nscm/cage / Cof/cage: 0125b Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 15, Gsin: 5330, Nsn: 5330 33 218 0038 Gasket P/n Requested: 4065545 Nscm/cage / Cof/cage: 0848b Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 16, Gsin: 5330, Nsn: 5330 33 218 0038 Gasket P/n Requested: 4065545 Nscm/cage / Cof/cage: 0848b Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 17, Gsin: 4730, Nsn: 4730 12 363 3125 Reducer, Tube P/n Requested: Red12/06zla3c Nscm/cage / Cof/cage: D8134 Quantity: 8 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 18, Gsin: 4730, Nsn: 4730 12 363 3125 Reducer, Tube P/n Requested: Red12/06zla3c Nscm/cage / Cof/cage: D8134 Quantity: 8 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 19, Gsin: 5330, Nsn: 5330 15 121 0511 Packing, Preformed P/n Requested: 5-612 N674-70 Nscm/cage / Cof/cage: A3958 Quantity: 25 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 20, Gsin: 5330, Nsn: 5330 15 121 0511 Packing, Preformed P/n Requested: 5-612 N674-70 Nscm/cage / Cof/cage: A3958 Quantity: 25 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 21, Gsin: 4730, Nsn: 4730 12 397 0740 Adapter, Straight, Tube To Boss P/n Requested: Ge12lr1/4cfx Nscm/cage / Cof/cage: D8134 Quantity: 12 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 22, Gsin: 4730, Nsn: 4730 12 397 0740 Adapter, Straight, Tube To Boss P/n Requested: Ge12lr1/4cfx Nscm/cage / Cof/cage: D8134 Quantity: 12 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 23, Gsin: 4820, Nsn: 4820 15 201 5924 Valve, Regulating, Fluid Pressure P/n Requested: Vcf35c B Viton Nscm/cage / Cof/cage: A4752 Quantity: 5 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 24, Gsin: 4820, Nsn: 4820 15 201 5924 Valve, Regulating, Fluid Pressure P/n Requested: Vcf35c B Viton Nscm/cage / Cof/cage: A4752 Quantity: 5 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 25, Gsin: 5930, Nsn: 5930 14 585 6465 Pedal Switch (foot) P/n Requested: Xpem110 Nscm/cage / Cof/cage: Fas02 Quantity: 5 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 26, Gsin: 5930, Nsn: 5930 14 585 6465 Pedal Switch (foot) P/n Requested: Xpem110 Nscm/cage / Cof/cage: Fas02 Quantity: 5 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 27, Gsin: 5930, Nsn: 5930 33 218 9773 Switch Thermostatic P/n Requested: 36030 Nscm/cage / Cof/cage: 1971b Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 28, Gsin: 5930, Nsn: 5930 33 218 9773 Switch Thermostatic P/n Requested: 36030 Nscm/cage / Cof/cage: 1971b Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 29, Gsin: 5820, Nsn: 5820 37 545 1937 Control-converter P/n Requested: Ddr-30g-24 Nscm/cage / Cof/cage: S8116 Quantity: 5 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 30, Gsin: 5820, Nsn: 5820 37 545 1937 Control-converter P/n Requested: Ddr-30g-24 Nscm/cage / Cof/cage: S8116 Quantity: 5 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 31, Gsin: 5920, Nsn: 5920 33 219 4072 Fuse Holder Extractor Post P/n Requested: P.616 Nscm/cage / Cof/cage: 8816b Quantity: 2 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 32, Gsin: 5920, Nsn: 5920 33 219 4072 Fuse Holder Extractor Post P/n Requested: P.616 Nscm/cage / Cof/cage: 8816b Quantity: 2 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 33, Gsin: 1680, Nsn: 1680 01 669 8259 Lever, Control P/n Requested: 1007185 Nscm/cage / Cof/cage: 7k7f9 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 34, Gsin: 1680, Nsn: 1680 01 669 8259 Lever, Control P/n Requested: 1007185 Nscm/cage / Cof/cage: 7k7f9 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 35, Gsin: 4730, Nsn: 4730 33 205 3376 Fitting, Lubrification P/n Requested: 2009319 Nscm/cage / Cof/cage: 0848b Quantity: 25 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 36, Gsin: 4730, Nsn: 4730 33 205 3376 Fitting, Lubrification P/n Requested: 2009319 Nscm/cage / Cof/cage: 0848b Quantity: 25 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 37, Gsin: 5306, Nsn: 5306 33 217 5746 Bolt, Internal Wrenching P/n Requested: 412396 16 Nscm/cage / Cof/cage: 551bb Quantity: 30 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 38, Gsin: 5306, Nsn: 5306 33 217 5746 Bolt, Internal Wrenching P/n Requested: 412396 16 Nscm/cage / Cof/cage: 551bb Quantity: 30 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 39, Gsin: 5325, Nsn: 5325 33 205 9306 Pin, Cotter P/n Requested: 0602254 Nscm/cage / Cof/cage: 0848b Quantity: 30 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 40, Gsin: 5325, Nsn: 5325 33 205 9306 Pin, Cotter P/n Requested: 0602254 Nscm/cage / Cof/cage: 0848b Quantity: 30 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 41, Gsin: 5305, Nsn: 5305 12 370 7996 Setscrew P/n Requested: Iso4026-m10x40-45h Nscm/cage / Cof/cage: I9008 Quantity: 30 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 42, Gsin: 5305, Nsn: 5305 12 370 7996 Setscrew P/n Requested: Iso4026-m10x40-45h Nscm/cage / Cof/cage: I9008 Quantity: 30 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 43, Gsin: 5310, Nsn: 5310 12 188 6493 Nut, Plain, Castellated, Hexagon P/n Requested: Din979-m24x1,5-05-znphrf Nscm/cage / Cof/cage: D8286 Quantity: 40 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 44, Gsin: 5310, Nsn: 5310 12 188 6493 Nut, Plain, Castellated, Hexagon P/n Requested: Din979-m24x1,5-05-znphrf Nscm/cage / Cof/cage: D8286 Quantity: 40 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 45, Gsin: 2530, Nsn: 2530 33 000 0734 Cap, Grease P/n Requested: 3499 Nscm/cage / Cof/cage: 1974b Quantity: 20 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 46, Gsin: 2530, Nsn: 2530 33 000 0734 Cap, Grease P/n Requested: 3499 Nscm/cage / Cof/cage: 1974b Quantity: 20 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 47, Gsin: 5310, Nsn: 5310 33 205 6966 Washer, Finishing P/n Requested: 0201969 Nscm/cage / Cof/cage: 0848b Quantity: 40 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 48, Gsin: 5310, Nsn: 5310 33 205 6966 Washer, Finishing P/n Requested: 0201969 Nscm/cage / Cof/cage: 0848b Quantity: 40 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 49, Gsin: 3120, Nsn: 3120 12 177 8991 Bearing, Washer, Thrust P/n Requested: Paw32p10 Nscm/cage / Cof/cage: D4871 Quantity: 20 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 50, Gsin: 3120, Nsn: 3120 12 177 8991 Bearing, Washer, Thrust P/n Requested: Paw32p10 Nscm/cage / Cof/cage: D4871 Quantity: 20 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 51, Gsin: 4320, Nsn: 4320 14 547 1429 Governor, Pump, Pressure Regulating P/n Requested: Olsa40152b0001 Nscm/cage / Cof/cage: F1606 Quantity: 5 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 52, Gsin: 4320, Nsn: 4320 14 547 1429 Governor, Pump, Pressure Regulating P/n Requested: Olsa40152b0001 Nscm/cage / Cof/cage: F1606 Quantity: 5 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 53, Gsin: 4730, Nsn: 4730 12 130 6681 Tee, Tube P/n Requested: T6l Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 54, Gsin: 4730, Nsn: 4730 12 130 6681 Tee, Tube P/n Requested: T6l Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 55, Gsin: 4730, Nsn: 4730 12 185 2661 Tee Tube P/n Requested: Evl6l0md Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 56, Gsin: 4730, Nsn: 4730 12 185 2661 Tee Tube P/n Requested: Evl6l0md Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 57, Gsin: 4730, Nsn: 4730 12 375 7616 Adapter, Straight, Tube To Boss P/n Requested: Ge10lredomdcf Nscm/cage / Cof/cage: D8134 Quantity: 25 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 58, Gsin: 4730, Nsn: 4730 12 375 7616 Adapter, Straight, Tube To Boss P/n Requested: Ge10lredomdcf Nscm/cage / Cof/cage: D8134 Quantity: 25 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 59, Gsin: 4730, Nsn: 4730 12 383 8749 Adapter, Straight, Tube To Boss P/n Requested: Ge06lredomdcf Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 60, Gsin: 4730, Nsn: 4730 12 383 8749 Adapter, Straight, Tube To Boss P/n Requested: Ge06lredomdcf Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 61, Gsin: 4730, Nsn: 4730 01 692 0371 Tee, Tube P/n Requested: Wh10lromdcf Nscm/cage / Cof/cage: 30780 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 62, Gsin: 4730, Nsn: 4730 01 692 0371 Tee, Tube P/n Requested: Wh10lromdcf Nscm/cage / Cof/cage: 30780 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 63, Gsin: 4730, Nsn: 4730 14 446 4289 Adapter, Straight, Tube To Boss P/n Requested: Ri1x1/2 Nscm/cage / Cof/cage: F0271 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 64, Gsin: 4730, Nsn: 4730 14 446 4289 Adapter, Straight, Tube To Boss P/n Requested: Ri1x1/2 Nscm/cage / Cof/cage: F0271 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 65, Gsin: 4730, Nsn: 4730 12 131 3965 Nipple, Tube P/n Requested: G10l Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 66, Gsin: 4730, Nsn: 4730 12 131 3965 Nipple, Tube P/n Requested: G10l Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 67, Gsin: 4730, Nsn: 4730 12 143 0160 Elbow Tube P/n Requested: Wsv15l Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 68, Gsin: 4730, Nsn: 4730 12 143 0160 Elbow Tube P/n Requested: Wsv15l Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 69, Gsin: 4730, Nsn: 4730 01 556 0240 Union, Tube P/n Requested: Sv10lomdcf Nscm/cage / Cof/cage: 30780 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 70, Gsin: 4730, Nsn: 4730 01 556 0240 Union, Tube P/n Requested: Sv10lomdcf Nscm/cage / Cof/cage: 30780 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 71, Gsin: 4730, Nsn: 4730 12 383 0939 Adapter, Straight, Tube To Boss P/n Requested: Sv12lomdcf Nscm/cage / Cof/cage: D8134 Quantity: 8 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 72, Gsin: 4730, Nsn: 4730 12 383 0939 Adapter, Straight, Tube To Boss P/n Requested: Sv12lomdcf Nscm/cage / Cof/cage: D8134 Quantity: 8 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 73, Gsin: 4730, Nsn: 4730 12 182 3200 Adapter, Straight, Tube To Boss P/n Requested: Evge12lred Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 74, Gsin: 4730, Nsn: 4730 12 182 3200 Adapter, Straight, Tube To Boss P/n Requested: Evge12lred Nscm/cage / Cof/cage: D8134 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 75, Gsin: 4730, Nsn: 4730 12 371 3068 Elbow, Tube P/n Requested: Ew12lomdcf Nscm/cage / Cof/cage: D8134 Quantity: 12 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 76, Gsin: 4730, Nsn: 4730 12 371 3068 Elbow, Tube P/n Requested: Ew12lomdcf Nscm/cage / Cof/cage: D8134 Quantity: 12 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 77, Gsin: 4730, Nsn: 4730 14 566 4961 Adapter, Straight, Tube To Boss P/n Requested: Ege10lredcf Nscm/cage / Cof/cage: Faqb2 Quantity: 12 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 78, Gsin: 4730, Nsn: 4730 14 566 4961 Adapter, Straight, Tube To Boss P/n Requested: Ege10lredcf Nscm/cage / Cof/cage: Faqb2 Quantity: 12 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 79, Gsin: 4730, Nsn: 4730 14 563 7624 Coupling Tube P/n Requested: Gz12lcf Nscm/cage / Cof/cage: C5018 Quantity: 8 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 80, Gsin: 4730, Nsn: 4730 14 563 7624 Coupling Tube P/n Requested: Gz12lcf Nscm/cage / Cof/cage: C5018 Quantity: 8 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 81, Gsin: 4730, Nsn: 4730 14 553 1150 Adapter, Straight, Tube To Boss P/n Requested: Ge12lr1-2edomdcf Nscm/cage / Cof/cage: Faqb2 Quantity: 12 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 82, Gsin: 4730, Nsn: 4730 14 553 1150 Adapter, Straight, Tube To Boss P/n Requested: Ge12lr1-2edomdcf Nscm/cage / Cof/cage: Faqb2 Quantity: 12 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 83, Gsin: 4730, Nsn: 4730 12 145 5655 Adapter, Straight, Tube To Boss P/n Requested: Ri3/4x3/8 Nscm/cage / Cof/cage: D8134 Quantity: 8 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 84, Gsin: 4730, Nsn: 4730 12 145 5655 Adapter, Straight, Tube To Boss P/n Requested: Ri3/4x3/8 Nscm/cage / Cof/cage: D8134 Quantity: 8 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 85, Gsin: 4730, Nsn: 4730 12 145 4376 Nipple, Tube P/n Requested: Sv6l Nscm/cage / Cof/cage: D8134 Quantity: 12 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 86, Gsin: 4730, Nsn: 4730 12 145 4376 Nipple, Tube P/n Requested: Sv6l Nscm/cage / Cof/cage: D8134 Quantity: 12 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 87, Gsin: 4730, Nsn: 4730 12 375 7584 Tee, Tube P/n Requested: T10lcfx Nscm/cage / Cof/cage: D8134 Quantity: 8 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 88, Gsin: 4730, Nsn: 4730 12 375 7584 Tee, Tube P/n Requested: T10lcfx Nscm/cage / Cof/cage: D8134 Quantity: 8 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 89, Gsin: 4310, Nsn: 4310 33 211 7744 Diaphragm, Pump, Special Shaped P/n Requested: 4008308 Nscm/cage / Cof/cage: 0848b Quantity: 3 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 90, Gsin: 4310, Nsn: 4310 33 211 7744 Diaphragm, Pump, Special Shaped P/n Requested: 4008308 Nscm/cage / Cof/cage: 0848b Quantity: 3 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 91, Gsin: 5930, Nsn: 5930 12 374 3592 Switch, Pressure P/n Requested: Pk6522 Nscm/cage / Cof/cage: C2241 Quantity: 5 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 92, Gsin: 5930, Nsn: 5930 12 374 3592 Switch, Pressure P/n Requested: Pk6522 Nscm/cage / Cof/cage: C2241 Quantity: 5 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 93, Gsin: 6350, Nsn: 6350 12 408 3672 Horn, Signal P/n Requested: 3al002952-811 Nscm/cage / Cof/cage: C6222 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 94, Gsin: 6350, Nsn: 6350 12 408 3672 Horn, Signal P/n Requested: 3al002952-811 Nscm/cage / Cof/cage: C6222 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 95, Gsin: 5925, Nsn: 5925 14 578 5902 Circuit Breaker P/n Requested: A9f94325 Nscm/cage / Cof/cage: Fas02 Quantity: 5 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 96, Gsin: 5925, Nsn: 5925 14 578 5902 Circuit Breaker P/n Requested: A9f94325 Nscm/cage / Cof/cage: Fas02 Quantity: 5 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 97, Gsin: 2920, Nsn: 2920 33 107 4046 Switch, Lock, Ignition P/n Requested: 40130 Nscm/cage / Cof/cage: 1971b Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 98, Gsin: 2920, Nsn: 2920 33 107 4046 Switch, Lock, Ignition P/n Requested: 40130 Nscm/cage / Cof/cage: 1971b Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 99, Gsin: 5945, Nsn: 5945 33 204 7493 Retainer Electrical Relay P/n Requested: 3032294 Nscm/cage / Cof/cage: 0848b Quantity: 5 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 100, Gsin: 5945, Nsn: 5945 33 204 7493 Retainer Electrical Relay P/n Requested: 3032294 Nscm/cage / Cof/cage: 0848b Quantity: 5 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 101, Gsin: 5999, Nsn: 5999 99 225 5376 Contact, Electrical P/n Requested: Zbe-101 Nscm/cage / Cof/cage: K1674 Quantity: 8 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 102, Gsin: 5999, Nsn: 5999 99 225 5376 Contact, Electrical P/n Requested: Zbe-101 Nscm/cage / Cof/cage: K1674 Quantity: 8 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 103, Gsin: 5999, Nsn: 5999 01 548 3551 Block-assembly P/n Requested: Zb4bz101 Nscm/cage / Cof/cage: 3wag4 Quantity: 8 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 104, Gsin: 5999, Nsn: 5999 01 548 3551 Block-assembly P/n Requested: Zb4bz101 Nscm/cage / Cof/cage: 3wag4 Quantity: 8 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 105, Gsin: 6210, Nsn: 6210 14 596 0263 Light, Indicator P/n Requested: Zb4bvj4 Nscm/cage / Cof/cage: Fas02 Quantity: 8 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 106, Gsin: 6210, Nsn: 6210 14 596 0263 Light, Indicator P/n Requested: Zb4bvj4 Nscm/cage / Cof/cage: Fas02 Quantity: 8 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 107, Gsin: 5895, Nsn: 5895 01 690 4142 Joystick, Data Entry P/n Requested: Xd4pa22 Nscm/cage / Cof/cage: 56365 Quantity: 12 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 108, Gsin: 5895, Nsn: 5895 01 690 4142 Joystick, Data Entry P/n Requested: Xd4pa22 Nscm/cage / Cof/cage: 56365 Quantity: 12 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 109, Gsin: 5895, Nsn: 5895 33 212 1970 Joystick, Data Entry P/n Requested: 6065089 Nscm/cage / Cof/cage: 0848b Quantity: 9 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 110, Gsin: 5895, Nsn: 5895 33 212 1970 Joystick, Data Entry P/n Requested: 6065089 Nscm/cage / Cof/cage: 0848b Quantity: 9 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 111, Gsin: 5930, Nsn: 5930 01 483 8558 Switch, Push P/n Requested: Zbe-102 Nscm/cage / Cof/cage: 51917 Quantity: 8 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 112, Gsin: 5930, Nsn: 5930 01 483 8558 Switch, Push P/n Requested: Zbe-102 Nscm/cage / Cof/cage: 51917 Quantity: 8 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 113, Gsin: 5975, Nsn: 5975 12 407 4752 Locknut, Electrical Conduit P/n Requested: Gmm216/7pa Nscm/cage / Cof/cage: D1129 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 114, Gsin: 5975, Nsn: 5975 12 407 4752 Locknut, Electrical Conduit P/n Requested: Gmm216/7pa Nscm/cage / Cof/cage: D1129 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 115, Gsin: 3120, Nsn: 3120 14 501 0474 Bearing, Sleeve P/n Requested: Paf 40260 P10 Nscm/cage / Cof/cage: F0563 Quantity: 20 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 116, Gsin: 3120, Nsn: 3120 14 501 0474 Bearing, Sleeve P/n Requested: Paf 40260 P10 Nscm/cage / Cof/cage: F0563 Quantity: 20 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 117, Gsin: 5305, Nsn: 5305 33 204 7454 Hexagonal Screw P/n Requested: 0464246 Nscm/cage / Cof/cage: 0848b Quantity: 50 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 118, Gsin: 5305, Nsn: 5305 33 204 7454 Hexagonal Screw P/n Requested: 0464246 Nscm/cage / Cof/cage: 0848b Quantity: 50 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 119, Gsin: 5365, Nsn: 5365 33 207 7402 Spacer, Ring P/n Requested: 5002448 Nscm/cage / Cof/cage: 0848b Quantity: 30 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 120, Gsin: 5365, Nsn: 5365 33 207 7402 Spacer, Ring P/n Requested: 5002448 Nscm/cage / Cof/cage: 0848b Quantity: 30 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 121, Gsin: 3120, Nsn: 3120 12 174 9457 Bearing Sleeve P/n Requested: Pap1015p10 Nscm/cage / Cof/cage: D8092 Quantity: 20 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 122, Gsin: 3120, Nsn: 3120 12 174 9457 Bearing Sleeve P/n Requested: Pap1015p10 Nscm/cage / Cof/cage: D8092 Quantity: 20 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 123, Gsin: 5331, Nsn: 5331 12 389 2854 O-ring P/n Requested: V1 2394 P5008 Nscm/cage / Cof/cage: D1333 Quantity: 15 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 124, Gsin: 5331, Nsn: 5331 12 389 2854 O-ring P/n Requested: V1 2394 P5008 Nscm/cage / Cof/cage: D1333 Quantity: 15 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 125, Gsin: 3110, Nsn: 3110 12 145 5232 Bearing, Ball, Annular P/n Requested: 6002-2rsr Nscm/cage / Cof/cage: Cm647 Quantity: 20 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 126, Gsin: 3110, Nsn: 3110 12 145 5232 Bearing, Ball, Annular P/n Requested: 6002-2rsr Nscm/cage / Cof/cage: Cm647 Quantity: 20 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 127, Gsin: 5340, Nsn: 5340 43 001 2428 Catch, Clamping P/n Requested: Zb-06 Nscm/cage / Cof/cage: 1983h Quantity: 7 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 128, Gsin: 5340, Nsn: 5340 43 001 2428 Catch, Clamping P/n Requested: Zb-06 Nscm/cage / Cof/cage: 1983h Quantity: 7 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 129, Gsin: 9390, Nsn: 9390 12 383 9036 Nonmetalic Special Shaped Section P/n Requested: 209-0206 Nscm/cage / Cof/cage: D4291 Quantity: 30 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 130, Gsin: 9390, Nsn: 9390 12 383 9036 Nonmetalic Special Shaped Section P/n Requested: 209-0206 Nscm/cage / Cof/cage: D4291 Quantity: 30 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Item 131, Gsin: 4730, Nsn: 4730 14 553 1089 Adapter, Straight, Pipe To Tube P/n Requested: Ge06lr1-4edomdcf Nscm/cage / Cof/cage: Faqb2 Quantity: 10 Unit Of Issue: Each To Be Delivered To 25 Cfsd Montreal, Quebec Item 132, Gsin: 4730, Nsn: 4730 14 553 1089 Adapter, Straight, Pipe To Tube P/n Requested: Ge06lr1-4edomdcf Nscm/cage / Cof/cage: Faqb2 Quantity: 10 Unit Of Issue: Each To Be Delivered To 7cfsd Edmonton, Alberta Bidders Proposing An Equivalent Or A Substitute Product Must Indicate The Brand Name And Model And/or Part Number And The Nscm/cage They Are Offering. The Crown Retains The Rights To Negotiate With Suppliers On Any Procurement. Documents May Be Submitted In Either Official Language Of Canada. Debriefings: Bidders May Request A Debriefing On The Results Of The Bid Solicitation Process. Bidders Should Make The Request To The Contracting Authority Within Fifteen (15) Working Days From Receipt Of The Results Of The Bid Solicitation Process. The Debriefing May Be Provided In Writing, By Telephone Or In Person. Electronic Submission Of Bids: This Requirement Uses Electronic Receipt Of Bids By E-mail Only. For Details, Please Review The Section Entitled Electronic Submission Of Bids In The Solicitation Document. Bids Must Be Submitted By E-mail Only To: Dlp53bidsreceiving.daat53receptiondessoumissions@forces.gc.ca
Closing Date9 Jan 2025
Tender AmountRefer Documents
2141-2150 of 2174 active Tenders