Fabrication Tenders
Fabrication Tenders
Department Of Agriculture Tender
Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Philippines
Details: Description Invitation To Bid For The Supply Of Labor And Materials For The Construction Of Vermi-composting Shed Located At Brgy. Upper Cabangcalan, Lazi, Siquijor 1. The Department Of Agriculture-regional Field Office 7, Through The Gaa 2025 Intends To Apply The Sum Of One Million Pesos (₱1,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Supply Of Labor And Materials For The Construction Of Vermi-composting Shed Located At Brgy. Upper Cabangcalan, Lazi, Siquijor. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture-regional Field Office 7, Now Invites Platinum Philgeps Registered Contractors/ Bidders To Bid Supply Of Labor And Materials For The Construction Of Vermi-composting Shed Located At Brgy. Upper Cabangcalan, Lazi, Siquijor. Scope Of Work Part A. General Requirements: Provision Of Field Office For The Engineers (rental Basis); Permits And Clearances (building Permit, Occupancy Permit And Other Clearances); Project Billboard/signboard (coa Recommended); Occupational Safety And Health Program; Part B. Earthworks: Clearing And Grubbing; Structure Excavation (common Soil); Embankment From Structure Excavation; Gravel Bedding; Part C. Reinforced Concrete Works: Structural Concrete (column, Pedestal Column And Roof Beam); Structural Concrete (pedestal Column Footing, Bin Footing, Wall Footing And Slab On Fill) Reinforcing Steel; Formworks And Falseworks; Part D. Carpentry And Joinery Works: Ceiling (4.5mm Fiber Cement); Part E. Door And Window: Jalousie Window (glass); Frames (jamb); Wooden Panel Door; Part F. Masonry Works: 100 Mm Chb Non Load Bearing (including Reinforcing Steel); Part G. Finishing: Cement Plaster Finish; Part H. Metal Structures: Structural Steel (steel Post And Roof Beam); Structural Steel (trusses); Structural Steel (purlins); Metal Structure Accessories (anchor Bolts); Metal Structure Accessories ( Turnbuckle); Metal Structure Accessories (cross Bracing); Metal Structure Accessories (steel Plates); Metal Structure Accessories (sagrods); Metal Structure Accessories (fascial Framing); Part I. Roofing Works: Prepainted Corrugated Metal Roofing; Fabricated Metal Roofing Accessory (fascia Cover, Ridge Roll, Hip Roll, Valley Roll And End Flashing); Part J. Painting Works: Painting Works (masonry Painting); Painting Works (metal Painting); Part K. Electrical Works: Conduits, Boxes And Fittings; Wires And Wiring Devices; Panelboard With Main & Branch Breakers; Lighting Fixtures And Lamps; Boq Notes: 1) The Bidder Must Furnish The Unit Cost Derivation Or Detailed Estimates For Each Work Item. It Is Advised To Include All Materials Outlined In The Approved Detailed Engineering Design (ded) Within The Detailed Estimates. In The Event That Certain Materials Are Not Specified In The Bid Detailed Estimate, The Contractor Must Provide Those Materials During Implementation Without Incurring Any Additional Cost To The Implementing Unit Or The Project. 2) Ocm Includes: (a) Overhead Espenses -engineering And Administrative Supervision, Transportation Allowances, Office Expenses, Premium On Contrator’s All Risk Insurance (cari) And Financing Cost; (b) Contingencies Expenses - Meetings, Coordination With Other Stakeholders, Stages During Ground Breaking And Inauguration Ceremonies, And Other Unforeseen Events. (c) Miscellaneous Expenses - Laboratory Tests For Quality Control And Plan Preparation. Site: Brgy. Upper Cabangcalan, Lazi, Siquijor. Completion Of The Works Is Required Within Seventy-eight (78) Calendar Days From Receipt Of The Approved Notice To Proceed (ntp). The Contractor / Bidder Must Have The Minimum Equipment Required One (1) Leased Plate Compactor; One (1) Leased One-bagger Mixer; One (1) Leased Bar Cutter; One (1) Leased Welding Machine And Technical Personnel Required: One (1) Project Engineer; One (1) Foreman; Two(2) Skilled Laborer; Ten (10) Unskilled Laborer; One (1) Safety Officer . Bidders Should Have Completed A Contract Similar To The Project. Similar Project Shall Refer To General Building. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. Bidders Must Have A Similar Completed Single Contract With A Value Of At Least 50% Of The Abc Of The Project To Be Bid. 3. Bidding Will Be Conducted Through Open Competitive Interested Bidders May Obtain Further Information From Department Of Agriculture Regional Field Office 7- Bac Secretariat And Inspect The Bidding Documents At The Address Given Below From 8:00 A.m.- 5:00 P.m.. 4. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders January 29, 2025 From Department Of Agriculture Regional Field Office 7- Bac Secretariat And Inspect The Bidding Documents At The Address Given Below From 8:00 A.m.- 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 29, 2025 From The Address Below And Upon Payment For The Bidding Documents, In The Amount Of One Thousand Pesos (1,000.00). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees Presented In Person, By Facsimile, Or Through Electronic Means. 6. The Department Of Agriculture Regional Field Office 7 Will Hold A Pre-bid Conference On February 6, 2025 -2:00 P.m. At Da Conference Room, Da Complex, Highway Maguikay, Mandaue City Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before February 18, 2025 – 10:00 A.m. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On February 18, 2025 -10:00 A.m. At Da Conference Room, Da Complex, Highway Maguikay, And Mandaue City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Department Of Agriculture Regional Field Office 7 Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 11. The Department Of Agriculture Regional Field Office 7 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Bac Secretariat Department Of Agriculture Regional Field Office-7 Tel No. 032-2682698 Fax Number 032- 256-3063 (sgd.) Dr. Fabio G. Enriquez Bac Chairperson
Closing Date18 Feb 2025
Tender AmountPHP 1 Million (USD 17.2 K)
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report ? Certifications Combo ? Receiving Report & Invoice ? Material ||tbd|n00104|tbd|tbd|n50286|tbd|||n/a||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332919|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
this Amendment Is Being Issued To Incorporate A New Tdp Version As Paragraph 3.2 Has Been Updated.
all Previous Quotes That Were Submitted Are No Longer Valid.
the Solicitation Closing Date Is Hereby Extended To 18 February 2024.
\
the Closing Date Is Extended To 04 February 2025.
1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg.
2.drawings Can Be Accessed Thru: Beta.sam.gov.
3.navsup Wss Mech Will Be Considering Past Performance In The Evaluation Of Offers. See Clause 252.213-7000.
4.portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference To N00102 Within This Order Should Be Updated To N50286.
5.all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, End Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To "issue" Contractual Documents Asdetailed Here In.
6.the Following Proposed Delivery Schedule Applies:
submission Of All Certification Data Cdrls 20 Days Prior To Delivery.
pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt
final Delivery Of Material (300 Days)
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.3 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
drawing Data=eb-2000 |96169| C|sp |d|0001 | C|49998|0484385
drawing Data=4384678 |80064| C| |d|0001 | C|49998|1136401
drawing Data=4385049 |53711| D| |d|0001 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0002 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0003 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0004 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0005 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0006 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0007 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0008 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0009 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0010 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0011 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0012 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0013 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0014 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0015 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0016 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0017 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0018 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0019 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0020 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0021 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0022 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0023 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0024 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0025 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0026 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0027 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0028 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0029 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0030 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0031 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0032 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0033 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0034 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0035 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0036 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0037 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0038 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0039 | D|00026|0000000
drawing Data=4385049 |53711| D| |d|0040 | D|00026|0000000
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
3. Requirements
3.1 ;seats For A Size 8-inch Ball Valve To Be In Accordance With Naval Ship Systems Command Drawing 4385049 Piece 3 Along With Naval Ship Systems Command General Notes Drawing 4384678, Except As Amplified Or Modified Herein.;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;seats (q3), Piece 3;
material - Mc903 (type 6 Cast Nylon Produced With Polyepsilon Caprolactam By The Direct Polymerization Process) As Manufactured By The Polymer Corporation Or Equal In Accordance With Electric Boat Division Specification 2000. (properties Specified Below Only)
item Property Test Method Value
(a) Melting Point Astm E794 Or Astm D3418 221 Deg C +/- 9
(b) Relative Viscosity Astm D789 (notes 1 And 4) 2000 Minimum
(c) Specific Gravity Astm D792 1.15-1.17 At 23 Deg C
(d) Dimensional Change Notes 2 & 4 0.2% Maximum
(e) Tensile Impact Astm D1822 Type S 80 Ft-lbs/in�2
Specimen (notes 5 & 6) Minimum (note 3)
(f) Tensile Yield Stress Astm D638 (note 6) 9000 Psi Min. (note 3)
(g) Compressive Strength^ Astm D695 (note 6) 9000 Psi Min. (note 3)
^(at 1 Percent Offset)
(h) Water Absorption
24 Hour Astm D570 1.3 Percent Maximum
Saturation Astm D570 7.0 Percent Maximum
(i) Rockwell "m" Hardness Astm D785 75 Minimum
note 1: The Test Specimen Must Be Finely Ground Particulates. After Immersion The Material Must Be Checked Daily For Dissolution And Must Dissolve No Longer Than One Hundred Twenty (120) Hours From The Start Of Immersion. Within Twenty-four (24) Hours Of The
test Specimen Determined To Be Fully Dissolved, It Must Be Tested For Viscosity.
note 2: Dimensional Stability Testing Must Be Performed In Accordance With The Dimensional Stability Method Per Astm D5989 Or Equivalent. The Percent Change In Each Dimension, Outside Diameter, Inside Diameter And Thickness Must Not Be Greater Than The Value
specified.
note 3: These Values Are Minimum Averages. Separate Specimens Results May Vary By 25%.
note 4: Any Change To An Already Established Heat Or Annealing Cycle To Achieve Both Relative Viscosity And/or Dimensional Stability Must Be Presented To The Procuring Activity For Approval Along With Justification For The Change.
note 5: Tensile-impact Test Specimens Are To Be Type S In Accordance With Astm D1822, Or Round Cylindrical Specimens In Accordance With Mil-dtl-32286, Paragraph 3.8
note 6: Prior To Test, The Specimens Must Be Dried In Accordance With Federal Specification L-p- 410a, Paragraph 4.4.5.
3.3 Seat Stack Height Measurement - To Ensure That Each Seat Is Within Tolerance, Check Each Seat Singularly By Measuring The Seat Height Over The Ball. This Measurement Is Calculated By Adding One-half Ball Diameter To The Half Stack Height Dimension On The
drawing. Limits Are Determined By The Ball Diameter Tolerance And The Half Stack Height Tolerance. Check Dimensions By Measuring From The Seat Back Face To Top Of Ball. Manufacturers Of Seats That Do Not Have A Ball Of The Required Size Available Will Be
required To Manufacture A Dummy Ball Or Segment Of A Ball With Sufficient Spherical Surface To Check The Above Dimension.
3.4 A Visual Inspection Shall Be Performed On The Finished Seat With Acceptance Criteria On Critical Surfaces Per Csd167 In The Ecds (electronic Contractor Data Submission) System At: Https://register.nslc.navy.mil/.
3.5 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.5.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A
copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.5.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.5.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.6 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.7 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.8 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.8.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
^ Quality Assurance Requirements ^
3.9 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System
3.9.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.9.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.9.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.9.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.9.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.10 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved
and Rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.10.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.10.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.11 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Command (dcmc) Office. In The Event That A Local Government Representative Or Dcmc Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.11.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.11.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.11.3 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.11.4 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must
be Established. Records Of This Effort Must Be Available For Review By The Government.
3.11.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.12 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.12.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.12.2 Inspection For Completeness And Proper Type.
3.12.3 Verification Of Material Quality Received.
3.12.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.12.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.12.6 Identification And Protection From Improper Use Or Disposition.
3.12.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.12.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.12.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.13 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.13.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That Implement The Material
control Requirements Stated Herein, And Elsewhere In This Contract/purchase Order.
3.14 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Batch Of Non-metallic Material, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.14.1 Material Marking - Each Seat Must Be Permanently Marked In Accordance With Mil-std-792, Type I And As Stated Below, Except For Teflon Seats, Which Must Only Be Tagged. Type Ix Marking May Be Substituted For Type I, Provided The Minimum Character Size
scribed By The Marking Tool Must Be Approximately 3/32 Inch High To Insure Legibility. Permanent Marking Is Not Permitted On Teflon Seats. When Permanent Marking Is Required, It Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And
function Of The Material. ;seats To Be Marked On The Outer Cylindrical Surface.;
seat Marking Requirements Must Maintain Complete Traceability To Certification Oqe. Seat Marking Must Be Either Heat/lot Or Batch Number, A Vendor Traceability Number/code, Or A Combination Thereof And Must Be Unique To The Material Certification.
3.15 See Cdrl Di-misc-80678 (seat Material) - Material Certification - The Contractor Must Furnish The Applicable Test Reports For Each Heat/lot/batch Of Seat Material. Material Certification Test Reports Must Include, In Addition To The Specification, The
class, Form, Grade, Type, Process, And/or Composition, As Applicable, Of The Material Supplied.
3.16 Material Handling - The Written Material Control Process Must Include The Following:
3.16.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.16.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.16.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Batches Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.16.4 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Codes That Are Marked On The Material And Identified On The Test Reports. The Certification Data Requirements Herein
must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.16.5 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.17 Receiving Inspection -
3.17.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.17.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Number Marked On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.18 Discrepancy Reporting -
3.18.1 Nonconforming Products Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To The Responsible Sub-tier
supplier In Accordance With Established Procedures. Nonconforming Material Records Will Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.19 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.19.1 Sampling For Certification Must Be On The Basis Of One Set Of Test Specimens From Each Heat/lot Or Batch.
3.20 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- Mar 22 2011 - Added Traceability Requirements For Non-metallic Seats
- Jul 02 2013 - Allowed Ball Valve Seats To Be Marked Using Mil-std-792 Type Ix In Addition To Type I
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section;
date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
Closing Date18 Feb 2025
Tender AmountRefer Documents
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY USA Tender
Plastic and Rubber
United States
Details: The Purpose Of This Sources Sought Notice Is To Conduct Market Research And Identify Potential Sources Of Commercial Products/services That Satisfy The Government’s Anticipated Needs.
background
the National Institute Of Standards And Technology (nist), Gaithersburg 731.07 Group Within The Engineering Laboratory Is Seeking An Extreme Thermal Cycling Chamber To Perform Accelerated Aging Experiments As Part Of A Study Of Long-term Reliability Of Materials Used In Advanced Packaging Of Semiconductor Chips. This Work Is In Support Of The Chips Metrology Program.
the Chips Metrology Program Develops And Advances Cutting Edge Metrology Capabilities For Members Of The Us Semiconductor Manufacturing Ecosystem. This Nist Conducted Research Program Works With Device Manufacturers, Tool Vendors, Materials Suppliers, And Other Organizations To Address Critical Metrology Gaps To Spur Innovation Within Seven Grand Challenge Areas. For More Information On Chips Metrology, Please Visit Https://www.nist.gov/chips/research-development-programs/metrology-program
nist Is Seeking Information From Sources That May Be Capable Of Providing A Solution That Will Achieve The Objectives Described Above, In Addition To The Following Essential Requirements:
sample Types And Sizes
samples Will Include Films, Multilayered Film Structures, And Sectioned Wafers
materials To Be Aged Will Include Polymeric Components In Advanced Packaging, Including Underfill And Encapsulation Epoxies, Fiber Reinforced Polymer Substrates, Along With Thermal Interface Materials, Filler Components, Treated Substrates. These Materials May Be Standalone Films, Combined Into Multilayered Composites, Or Combined Into Assembled Semiconductor Structures As Part Of A Fabricated Test Vehicle.
largest Sample Size Is Expected To Be A 300 Mm Wafer.
thermal Cycling
oven Must Provide A Wide Temperature Range Of At Least -100 °c To 200 °c.
oven Must Also Provide Rapid Thermal Cycling With Thermal Ramp Rates Of At Least 70°c/min. Provide The Thermal Cycling Rate Along With Whether The Ramp Rate Can Be Controlled/modified.
thermocouple Must Be Included. Provide The Number Of Thermocouples, Their Location, And The Temperature Accuracy Of The Oven.
wire Port
sample Degradation Will Be Monitored During Thermal Aging. This Will Require A Pass-through Port To Allow For Monitoring Cables To Be Fed Through The Oven. The Pass-through Port Must Be 2-3” In Diameter. Multiple Pass-through Ports Of Smaller Size Will Also Be Considered. Provide These Details.
how To Respond To This Notice
in Responding To This Notice, Please Do Not Provide Proprietary Information. Please Include Only The Following Information, Readable In Either Microsoft Word 365, Microsoft Excel 365, Or .pdf Format, In The Response: Submit The Response By Email To The Primary Point Of Contact And, If Specified, To The Secondary Point Of Contact Listed In This Notice As Soon As Possible, And Preferably Before The Closing Date And Time Of This Notice. Please Note That To Be Considered For Award Under Any Official Solicitation, The Entity Must Be Registered And “active” In Sam At The Time Of Solicitation Response.
provide The Complete Name Of Your Company, Address, Name Of Contact For Follow-up Questions, Their Email, Their Phone Number And, If Your Company Has An Active Registration In Https://sam.gov, Your Company’s Unique Entity Id (uei).
identify The Equipment That Your Company Sells That Can Meet The Objectives Addressed In The Background Section Of This Notice. For Each Product Recommended To Meet The Government’s Requirement, Provide The Following:
manufacturer Name
model Number
technical Specifications
if Your Company Is Not The Manufacturer, Provide Information On Your Company’s Status As An Authorized Reseller Of The Product(s)
describe Performance Capabilities Of The Product(s) Your Company Recommends To Meet The Government’s Requirements. Additionally, If There Are Other Features Or Functions That You Believe Would Assist Nist In Meeting Its Objectives Described Above, Please Discuss In Your Response.
discuss Whether The Equipment That Your Company Sells And Which You Describe In Your Response To This Notice May Be Customized To Specifications And Indicate Any Limits To Customization.
identify Any Aspects Of The Nist Market Research Notice, Including Instructions, And Draft Minimum Specifications In The Background Section You Cannot Meet And State Why. Please Offer Suggestions For How The Market Research Notice And Draft Minimum Specifications Could Be Made More Competitive.
state Whether The Proposed Equipment Is Manufactured In The United States And, If Not, State The Name Of The Country Where The Equipment Is Manufactured.
identify Any Plans/possibilities For Changes In Manufacturing Location Of The Aforementioned Equipment And Provide Relevant Details, Including Timeline.
for The Naics Code Listed In This Notice:
indicate Whether Your Company Is (a) A Small Business Or (b) Other Than Small Business. See The Table Of Small Business Size Standards And The Associated .pdf Download File For Small Business Size Standards And Additional Information.
if You Believe The Naics Code Listed In This Notice Is Not The Best Naics Code For The Type Of Product Addressed In This Notice, Identify An Alternative Naics Code That You Believe Would Be More Appropriate For The Planned Procurement.
describe Services That Are Available With The Purchase Of The Aforementioned Equipment From Your Company Such As Installation, Training, And Equipment Maintenance.
describe Standard Terms And Conditions Of Sale Offered By Your Company For The Recommended Equipment Such As: Delivery Time After Your Company Accepts The Order; Fob Shipping Terms; Manufacturer Warranty (including Details Regarding Nature And Duration); If Available, Description(s) Of Available Extended Warranty; Equipment Setup And Test; Operator And Service Instruction Manual(s); Cleanup After Installation; And If Applicable, Other Offered Services. Provide A Copy Of Manufacturer Standard Terms And Conditions That Typically Relate To The Sale Of The Specified Equipment, If Available.
state Whether Your Company Offers Facility Renovation Services Related To Installation Of The Recommended Equipment At Its Delivery Destination, If Required Per The Nist-identified Minimum Specifications, And Provide Description Of Said Services. Indicate If Your Company Performs The Facility Renovation Services Or Typically Subcontracts The Work To Another Company. Indicate If Your Company Would Be Interested In Inspecting The Intended Installation Site During The Market Research Phase.
state Published Price, Discount, Or Rebate Arrangements For Recommended Equipment And/or Provide Link To Access Company’s Published Prices For Equipment And Services.
if The Recommended Equipment And Related Services Are Available For Purchase On Any Existing Federal Supply Schedule Contract(s) Or Other Contracts Against Which Nist May Be Able To Place Orders, Identify The Contract Number(s) And Other Relevant Information.
identify Any Customers In The Public Or Private Sectors To Which You Provided The Recommended Or Similar Equipment. Include Customer(s) Information: Company Name, Phone Number, Point Of Contact, Email Address.
provide Any Other Information That You Believe Would Be Valuable For Nist To Know As Part Of Its Market Research For This Requirement.
state If You Require Nist To Provide Additional Information To Improve Your Understanding Of The Government’s Requirement And/or Would Like To Meet With Nist Representatives To Discuss The Requirement And The Capabilities Of The Identified Equipment.
questions Regarding This Notice
questions Regarding This Notice May Be Submitted Via Email To The Primary Point Of Contact And The Secondary Point Of Contact Listed In This Notice. Questions Should Be Submitted So That They Are Received 5 Calendar Days Prior To The Response Date. If The Contracting Officer Determines That Providing A Written Amendment To This Notice To Document Question(s) Received Would Benefit Other Potential Respondents, The Questions Would Be Anonymized, And A Written Response To Such Question(s) Would Be Provided Via An Amendment To This Notice.
important Notes
this Notice Is For Market Research Purposes And Should Not Be Construed As A Commitment By Nist To Issue A Solicitation Or Ultimately Award A Contract. There Is No Solicitation Available At This Time.
this Notice Does Not Obligate The Government To Award A Contract Or Otherwise Pay For The Information Provided In Response.
nist Reserves The Right To Use Information Provided By Respondents For Any Purpose Deemed Necessary And Legally Appropriate.
any Organization Responding To This Notice Should Ensure That Its Response Is Complete And Sufficiently Detailed To Allow The Government To Determine The Organization’s Capability.
respondents Are Advised That The Government Is Under No Obligation To Acknowledge Receipt Of The Information Received Or Provide Feedback To Respondents With Respect To Any Information Submitted.
after A Review Of The Responses Received, A Synopsis And Solicitation May Be Published On Gsa’s Ebuy Or Sam.gov. However, Responses To This Notice Will Not Be Considered An Adequate Response To Any Such Solicitation(s).
thank You For Taking The Time To Submit A Response To This Request!
Closing Date13 Feb 2025
Tender AmountRefer Documents
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY USA Tender
Others
United States
Details: The Purpose Of This Sources Sought Notice Is To Conduct Market Research And Identify Potential Sources Of Commercial Products/services That Satisfy The Government’s Anticipated Needs.
background
the National Institute Of Standards And Technology (nist), Gaithersburg 731.07 Group Within The Engineering Laboratory Is Seeking A Laboratory Oven Capable To Perform Accelerated Aging Experiments As Part Of A Study Of Long-term Reliability Of Materials Used In Advanced Packaging Of Semiconductor Chips. This Work Is In Support Of The Chips Metrology Program.
the Chips Metrology Program Develops And Advances Cutting Edge Metrology Capabilities For Members Of The Us Semiconductor Manufacturing Ecosystem. This Nist Conducted Research Program Works With Device Manufacturers, Tool Vendors, Materials Suppliers, And Other Organizations To Address Critical Metrology Gaps To Spur Innovation Within Seven Grand Challenge Areas. For More Information On Chips Metrology, Please Visit Https://www.nist.gov/chips/research-development-programs/metrology-program
nist Is Seeking Information From Sources That May Be Capable Of Providing A Solution That Will Achieve The Objectives Described Above, In Addition To The Following Essential Requirements:
sample Types And Sizes
samples Will Include Films, Multilayered Film Structures, And Sectioned Wafers
materials To Be Aged Will Include Polymeric Components In Advanced Packaging, Including Underfill And Encapsulation Epoxies, Fiber Reinforced Polymer Substrates, Along With Thermal Interface Materials, Filler Components, Treated Substrates. These Materials May Be Standalone Films, Combined Into Multilayered Composites, Or Combined Into Assembled Semiconductor Structures As Part Of A Fabricated Test Vehicle.
largest Sample Size Is Expected To Be A Sectioned 300 Mm Wafer.
thermal Range
oven Must Provide Temperature Up To At Least 300 °c.
thermocouple Must Be Included. Provide The Number Of Thermocouples, Their Location, And The Temperature Accuracy Of The Oven.
indicate How Many Shelves Are Included In The Unit Along With Sizing.
wire Port
sample Degradation Will Be Monitored During Thermal Aging. This Will Require A Pass-through Port To Allow For Monitoring Cables To Be Fed Through The Oven. The Pass-through Port Must Be 2-3” In Diameter. Multiple Pass-through Ports Of Smaller Size Will Also Be Considered. Provide These Details.
how To Respond To This Notice
in Responding To This Notice, Please Do Not Provide Proprietary Information. Please Include Only The Following Information, Readable In Either Microsoft Word 365, Microsoft Excel 365, Or .pdf Format, In The Response: Submit The Response By Email To The Primary Point Of Contact And, If Specified, To The Secondary Point Of Contact Listed In This Notice As Soon As Possible, And Preferably Before The Closing Date And Time Of This Notice. Please Note That To Be Considered For Award Under Any Official Solicitation, The Entity Must Be Registered And “active” In Sam At The Time Of Solicitation Response.
provide The Complete Name Of Your Company, Address, Name Of Contact For Follow-up Questions, Their Email, Their Phone Number And, If Your Company Has An Active Registration In Https://sam.gov, Your Company’s Unique Entity Id (uei).
identify The Equipment That Your Company Sells That Can Meet The Objectives Addressed In The Background Section Of This Notice. For Each Product Recommended To Meet The Government’s Requirement, Provide The Following:
manufacturer Name
model Number
technical Specifications
if Your Company Is Not The Manufacturer, Provide Information On Your Company’s Status As An Authorized Reseller Of The Product(s)
describe Performance Capabilities Of The Product(s) Your Company Recommends To Meet The Government’s Requirements. Additionally, If There Are Other Features Or Functions That You Believe Would Assist Nist In Meeting Its Objectives Described Above, Please Discuss In Your Response.
discuss Whether The Equipment That Your Company Sells And Which You Describe In Your Response To This Notice May Be Customized To Specifications And Indicate Any Limits To Customization.
identify Any Aspects Of The Nist Market Research Notice, Including Instructions, And Draft Minimum Specifications In The Background Section You Cannot Meet And State Why. Please Offer Suggestions For How The Market Research Notice And Draft Minimum Specifications Could Be Made More Competitive.
state Whether The Proposed Equipment Is Manufactured In The United States And, If Not, State The Name Of The Country Where The Equipment Is Manufactured.
identify Any Plans/possibilities For Changes In Manufacturing Location Of The Aforementioned Equipment And Provide Relevant Details, Including Timeline.
for The Naics Code Listed In This Notice:
indicate Whether Your Company Is (a) A Small Business Or (b) Other Than Small Business. See The Table Of Small Business Size Standards And The Associated .pdf Download File For Small Business Size Standards And Additional Information.
if You Believe The Naics Code Listed In This Notice Is Not The Best Naics Code For The Type Of Product Addressed In This Notice, Identify An Alternative Naics Code That You Believe Would Be More Appropriate For The Planned Procurement.
describe Services That Are Available With The Purchase Of The Aforementioned Equipment From Your Company Such As Installation, Training, And Equipment Maintenance.
describe Standard Terms And Conditions Of Sale Offered By Your Company For The Recommended Equipment Such As: Delivery Time After Your Company Accepts The Order; Fob Shipping Terms; Manufacturer Warranty (including Details Regarding Nature And Duration); If Available, Description(s) Of Available Extended Warranty; Equipment Setup And Test; Operator And Service Instruction Manual(s); Cleanup After Installation; And If Applicable, Other Offered Services. Provide A Copy Of Manufacturer Standard Terms And Conditions That Typically Relate To The Sale Of The Specified Equipment, If Available.
state Whether Your Company Offers Facility Renovation Services Related To Installation Of The Recommended Equipment At Its Delivery Destination, If Required Per The Nist-identified Minimum Specifications, And Provide Description Of Said Services. Indicate If Your Company Performs The Facility Renovation Services Or Typically Subcontracts The Work To Another Company. Indicate If Your Company Would Be Interested In Inspecting The Intended Installation Site During The Market Research Phase.
state Published Price, Discount, Or Rebate Arrangements For Recommended Equipment And/or Provide Link To Access Company’s Published Prices For Equipment And Services.
if The Recommended Equipment And Related Services Are Available For Purchase On Any Existing Federal Supply Schedule Contract(s) Or Other Contracts Against Which Nist May Be Able To Place Orders, Identify The Contract Number(s) And Other Relevant Information.
identify Any Customers In The Public Or Private Sectors To Which You Provided The Recommended Or Similar Equipment. Include Customer(s) Information: Company Name, Phone Number, Point Of Contact, Email Address.
provide Any Other Information That You Believe Would Be Valuable For Nist To Know As Part Of Its Market Research For This Requirement.
state If You Require Nist To Provide Additional Information To Improve Your Understanding Of The Government’s Requirement And/or Would Like To Meet With Nist Representatives To Discuss The Requirement And The Capabilities Of The Identified Equipment.
questions Regarding This Notice
questions Regarding This Notice May Be Submitted Via Email To The Primary Point Of Contact And The Secondary Point Of Contact Listed In This Notice. Questions Should Be Submitted So That They Are Received 5 Calendar Days Prior To The Response Date. If The Contracting Officer Determines That Providing A Written Amendment To This Notice To Document Question(s) Received Would Benefit Other Potential Respondents, The Questions Would Be Anonymized, And A Written Response To Such Question(s) Would Be Provided Via An Amendment To This Notice.
important Notes
this Notice Is For Market Research Purposes And Should Not Be Construed As A Commitment By Nist To Issue A Solicitation Or Ultimately Award A Contract. There Is No Solicitation Available At This Time.
this Notice Does Not Obligate The Government To Award A Contract Or Otherwise Pay For The Information Provided In Response.
nist Reserves The Right To Use Information Provided By Respondents For Any Purpose Deemed Necessary And Legally Appropriate.
any Organization Responding To This Notice Should Ensure That Its Response Is Complete And Sufficiently Detailed To Allow The Government To Determine The Organization’s Capability.
respondents Are Advised That The Government Is Under No Obligation To Acknowledge Receipt Of The Information Received Or Provide Feedback To Respondents With Respect To Any Information Submitted.
after A Review Of The Responses Received, A Synopsis And Solicitation May Be Published On Gsa’s Ebuy Or Sam.gov. However, Responses To This Notice Will Not Be Considered An Adequate Response To Any Such Solicitation(s).
thank You For Taking The Time To Submit A Response To This Request!
Closing Date13 Feb 2025
Tender AmountRefer Documents
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Works
Electrical Works...+1Electrical and Electronics
Eprocure
India
Details: Works contract for execution of providing 1)Improvement estimate for providing 2 nos 11KV ABSwitch in Various locations in Thickanamcode feeder under Thickanamcode Section. 2)Improvement estimate for 8nos 8mtr PSC pole in various DTs in various locations under Thuckalay Section. 3)Improvement estimate for newly proposed 1no double pole 11KV AB Switch at Mulavilai under Thiruvattar Section. 4)Improvement estimate for newly proposed 6nos single pole 11KV AB Switches in 11KV Arumanai Feeder under Thiruvattar Section. 5)Improvement estimate for 3mos 9.14 mtr RCC poles into 9mtr PSC poles in Muthalakurichy SS II FI/2,3,4 under Thuckalay Section. 6)Improvement estimate for strengthening of existing LT conductor ACSR 7/2.11 into ACSR 7/3.35 in FI/1 to FI/15 in Puliyanvilai SS 100KVA under Thiruvattar feeder. 7)Improvement estimate for newly proposed 1no single pole 11KV AB Switch at Thattanvilai under Thiruvattar Section. 8)Improvement estimate for improving tailend voltage to be changed with existing Panavilai SS III 25KVA tobe enhanced to 63 KVA DT by secreating GH SS in Thuckalay feeder under TKY Section. 9)Improvement estimate for improving tailend voltage by secreating in Puliyoorkurichy SS V into by providing 1no 63KVA DT in Thuckalay feeder under TKY Section. 10)Improvement estimate for newly proposed 100KVA DT for improving tail end voltage by segregating Puliyoorkurichy SS I in Thuckalay feeder under Thuckalay section. 11)Improvement estimate for replacement of deteriorated 4nos 9.14 mtr RCC pole into 9mtr PSC pole and 1no 9 mtr into 9m PSC pole in various locations under MCL Section. 12)Improvement estimate for newly proposed 1no 63KVA DT for Improving TailEnd Voltage in Kulasekharam Market area in Thiruvattar Feeder under U KLm Section. 13)Improvement estimate for newly proposed 1nos 25 KVA DT at Veeyanoor Substation Quarters in 11KV Chandam Feeder under Thiruvattar Section. 14)Improvement estimate for strengthening of existing aged LT conductor ACSR 7/2.50 into ACSR 7/3.35 at Mathiravilai Kurusady Area for improving tail end voltage under TKD Section. 15)Improvement estimate for 4nos 9.14 mtr RCC poles into 9mtr PSC poles in 11KV Charode and CWSS feeders and 1no 8mtr RCC pole into 8mtr PSC for detoriated in various locations under Thuckalay Section. 16)Improvement estimate for improving tailend voltage suply in single phase connected load in Kuttakarai SS 100 KVA by stringing addl 2phase wire for reulating normal voltage at Kuttakarai area under TKY section. 17)Improvement estimate is prepared for the erection of 11 KV HT feeder link line between 11KV Mulagumoodu Feeder and 11KV Eraniel Feeder under Moolachel Section. 18)Improvement estimate for strengthening of existing HT conductor ACSR 7/2.5 into ACSR 7/4.09 in TKY SS 1,4,5 to Perumal Kovil under Thuckalay Section. 19)Improvement estimate for strengthening of existing LT conductor ACSR 7/2.11 into ACSR 7/3.35 in F2/1 to F2/23 in Puliyoorkurichy 250 KVA under Thiruvattar feeder. 20)Improvement estimate for replacement of 1nos 9mtr PSC pole and 6no 8mtr PSC pole and 2nos RSJ pole insertion in various locations in various DT under VCI section. 21)Improvement estimate for strenthening of existing LT conductor ACSR 7/2.59 into 7/4.09 and insertion of 9mtr PSC pole in various DT in Kothanalloor Feeder under MCL section. 22)Improvement estimate for insertion of 1no 9mtr PSC pole and 1no existing 8mtr pole into 9mtr PSC pole and 1no 9mtr stud pole in 11KV Chandam feeder under Moolachel Section. 23)Improvement estimate for replacement of deteriorated 8nos 8 mtr RCC pole into 8mtr PSC pole and 1no 8 mtr insertion PSC pole in various loacation under MCL Section. 24)Improvement estimate for replacement of 3nos RSJ pole 5nos 9mtr PSC poles and 2nos 8mtr PSC deteriorated poles in various locations under VCI Section. 25)Improvement estimte for replacement of 2nos 9.14 mtr RCC pole into RSJ Fabricated and 2nos damaged RSJ pole in low ground clearance in various loacation under MCL section. 26)Improvement estimate for replacement of deteriorated 4nos 8mtr PSC pole into 8mtr PSC poles in Poonangaparambu SS III 25KVA in various locations under MCL Section. 27)Improvement estimate for providing linkline between two 11KV feeders(Thickanamcode & Kattuvilai) Near Railway Bridge under Thickanamcode Section. 28)Improvement estimate for replacement of 6nos deteriorated RSJ poles and 1nos Tubular in various locations under Thuckalay Section. 29)Improvement estimate for provision of 3 feeders nos additional 11KV rotating AB Switch in existing 11KV Aloor & Mulagumoodu and Kothanalloor Feeders 110/11 KV SS Campous Thuckalay under Substation Thuckalay. 30)Improvement estimate for 11KV AB Switch in to 11KV Center Rotating AB Switch in Thiruvattar-Arumanai Tie Switch in 110/11 KV Sub station Veeyanoor. 31)EOS to 1no IIIB INDL additional load toTmy.Jaya Paulcy Bai at Ottalivilai by providing 250KVA DT under Thiruvattar Section. 32)Estimate for 1no IIIB service to Thiru.Sreekutty Enterprices at Marunthukottai under Thuckalay Section. 33)Improvement estimate for replacement of 6 nos deteriorted 9mtr PSC poles in various DTs under MCL Section. 34)Natural Calamity estimate for the replacement of damaged 1no single pole structure in Aanayadi Cashew Industries SS 100KVA due to fallen of Rubber tree under Thiruvattar Section. 35)Eos for 1no III B INDL additional load service to Thiru.Renish at Sadayalputhoor Rod at Peyode by providing 100KVA in 11KV Kattimancode feeder under Vellichanthai Section. 36)Estimate for 1no industrial SC to Tmy.A.Nabisath Beevi at main road Tiruvithamcode under Moolachel Section. 37)Eos to 1no IIA OHT service to The President Kumarankudi Village Panchayat by providing 1no 63KVA DT at Poovancode under Thiruvattar Section. 38)DCW estimate for shifting of existing 1No 100 KVA distribution transformer in Tholichal SS I and 1no 9mtr PSC poles as per the request of Thiru.Vishnu Prasad at Pullanivilai under Thiruvattar Section. 39)Improvement estimate for providing 1No 63KVA DT improving tail end voltage in Thirunainarkurichy SS I in 11 KV Vellichanthai Feeder under VCI Section. 40)Improvement estimate for providing 1No 63KVA DT Improving Tail end voltage to avoid electical accident in Vellamodi Junction in 11KV Kattimancode Feeder under VCI Section.Kanyakumari Electricity Distribution Circle – Regarding.
Closing Date4 Jan 2025
Tender AmountRefer Documents
Municipality Of Irosin, Sorsogon Tender
Civil And Construction...+1Building Construction
Philippines
Details: Description Republic Of The Philippines Province Of Sorsogon Municipality Of Irosin Bids & Awards Committee Invitation To Bid For Improvement/upgrading Of Super Health Center 1. The Local Government Unit Of Irosin, Through The 20% Edf 2025 Intends To Apply The Sum Of One Million Eight Hundred Nine Thousand Eight Hundred Forty Five Pesos (p 1,809,845.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Improvement/upgrading Of Super Health Center, Infr-05-2025. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Name Of Contract : Improvement/upgrading Of Super Health Center Brief Description: Fabrication/installation Of Forms & Rsb And Concrete Pouring For Concrete Counters/tile Setting For Lavatories And Counters/acp Cladding Of Cabinets/installation Of Plumbing And Electrical Fixtures And Fabrication/installation Of Canopies Approved Budget For The Contract : P 1,809,845.00 Source Of Fund : 20% Edf 2025 2. The Local Government Unit Of Irosin Now Invites Bids For The Above Procurement Project. Completion Of Works Is Ninety (90) Calendar Days. Bidders Should Have Completed At Least One Similar Project For The Last Five(5) Years And Whose Value, Of The Contract, Adjusted To Current Prices Using The Nso Consumer Price Indices Must Be Equal To 50% Of The Abc To Be Bid. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184). 4. Interested Bidders May Obtain Further Information From Local Government Unit Of Irosin And Inspect The Bidding Documents At The Address Given Below From 8:00 Am-5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 28, 2025 Until February 18, 2025 From The Given Address And Philgeps Website And Lgu-irosin Website And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (p 5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Presenting In Person The Official Receipt Of Bid Documents To The Bac Office. 6. The Local Government Unit Of Irosin Will Hold A Pre-bid Conference On February 5, 2025, 2:00pm At The Conference Room, Office Of The Municipal Mayor, Municipal Compound, San Julian, Irosin, Sorsogon, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before February 18, 2025, 1:59 Pm At Bac Office, Municipal Compound, San Julian, Irosin, Sorsogon. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On February 18, 2025, 2025, 2:00 Pm At The Given Address Below Conference Room, Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 10. The Local Government Unit Of Irosin Reserves The Right To Accept Any And All Bids, Declare A Failure Of Bidding Or Not Award A Contract At Any Time Prior To Contract Award In Accordance With Section 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations(irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11.for Further Information, Please Refer To: Benjamin M. Gabionza, Ce Municipal Engineer Municipal Compound, San Julian, Irosin, Sorsogon Url: Www.irosin.gov.ph Email Address: Bengabionza@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps Website And Www.irosin.gov.ph Date Of Posting: January 28, 2025 _____________________ Noel D. Mercado Ii Bac Chairman Standard Form Number: Sf-infr-07 Revised On: July 29, 2004 Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ A) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Or B) Registration From Sec, Department Of Trade And Industry(dti) For Sole Proprietorship And Cda For Cooperatives C) Valid Mayor’s Permit By The City Or Municipality Where The Principal Place Of Business Is Located D) Tax Clearance Per Eo 398 E) Tax Clearance For Collection Purposes Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid Completed Within The Last Five(5) Years, Except Under Conditions Provided Under The Rules; And • The Statement Shall Include The Following: (1)name Of The Contract; (2)date Of The Contract; (3)contract Duration; (4)owner’s Name And Address; (5)nature Of Work; (6)contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation; (7)total Contract Value At Award; (8)date Of Completion Or Estimated Completion Time; (9)total Contract Value At Completion, If Applicable; (10)percentages Of Planned And Actual Accomplishments, If Applicable; (11)value Of Outstanding Works, If Applicable; (12)the Statement Shall Be Supported By The Notices Of Award And/or Notices To Proceed Issued By The Owners; And (13)the Statement Shall Be Supported By The Constructors Performance Evaluation System (cpes) Rating Sheets, And/or Certificates Of Completion And Owner’s Acceptance, If Applicable; ⬜ (d) Valid Pcab License-category B, Size Range Medium A Or Higher/special Pcab License In Case Of Joint Ventures And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss) And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. (h) Affidavit Of Site Inspection Financial Documents ⬜ (i) Audited Financial Statement Stamped Received By The Bureau Of Internal Revenue(bir) Or Its Duly Authorized Institutions, For The Immediately Preceding Calendar Year, Which Should Not Be Earlier From Two(2) Years From The Date Of Submission (j) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (k) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (l) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (m) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (n) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (o) Cash Flow By Quarter. Instruction To Bidders 1. Scope Of Bid The Procuring Entity, Local Government Unit Of Irosin Invites Bids For The Improvement/upgrading Of Super Health Center, With Project Identification Number Infr-05-2025. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project (referred To Herein As “project”) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 20% Edf 2025 In The Amount Of One Million Eight Hundred Nine Thousand Eight Hundred Forty Five Pesos (p 1,809,845.00). 2.2. The Source Of Funding Is: 20% Edf 2025 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.1. Subcontracting Is Not Allowed During The Bidding. 7.2. Subcontracting Is Not Allowed During The Contract Implementation Stage. 7.3. Subcontracting Of Any Portion Of The Project Does Not Relieve The Contractor Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On February 18, 2025, 9:00am And Either At Its Physical Address Office Of The Mayor, Municipal Compound, San Julian, Irosin, Sorsogon In A Face-to-face Manner As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Special Pcab License In Case Of Joint Ventures, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: Philippine Pesos 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until One Hundred Twenty(120) Calendar Days. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Improvement/upgrading Of Super Health Center I.forms And Scaffolding Works Ii. Rsb Works Iii. Concrete Works Iv. Tile Works V. Ceiling Works Vi. Electrical Works Vii. Painting Works Viii. Doors And Windows Ix. Canopy Works X. Other Works Spl-1 Amenities Spl-2 Ppe’s Spl-3 Project Signage 7.1 Not Applicable Since Sub-contracting Is Not Allowed. 10.3 The Other Contractor’s License Or Permit Required Is Bir Registration. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Improvement/upgrading Of Super Health Center Key Personnel General Experience Relevant Experience 1. Foreman 2. Skilled Worker 3.laborer 10.5 Improvement/upgrading Of Super Health Center The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units 1.concrete Mixer 2. Water Truck 3.welding Machine 4. Enough Hand Tools 12 Value Engineering Clause Is Not Allowed. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. [two Percent (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. [five Percent (5%) Of Abc] If Bid Security Is In Surety Bond. 19.2 Partial Bids Are Not Allowed. 20 Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It: Bir Registration 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And Other Acceptable Tools Of Project Scheduling. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 3.1 The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 3.2 If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Rehabilitation/improvement Of Brgy. Cawayan Level Ii Water System Gcc Clause 2 Sectional Completion Is Not Applicable Since All Works Must Be Completed Within 90 Calendar Days. 4.1 The Schedule Of Delivery Of The Possession Of The Site To The Contractor, Whether Full Or In Part Is Seven(7) Calendar Days After The Issuance Of The Notice To Proceed(ntp). 6 The Site Investigation Reports Are: Upgrading Of Super Health Center. 7.2 In Case Of Permanent Structures, Such As Buildings Of Types 4 And 5 As Classified Under The National Building Code Of The Philippines And Other Structures Made Of Steel, Iron, Or Concrete Which Comply With Relevant Structural Codes (e.g., Dpwh Standard Specifications), Such As, But Not Limited To, Steel/concrete Bridges, Flyovers, Aircraft Movement Areas, Ports, Dams, Tunnels, Filtration And Treatment Plants, Sewerage Systems, Power Plants, Transmission And Communication Towers, Railway System, And Other Similar Permanent Structures: Fifteen (15) Years. In Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures: Five (5) Years. In Case Of Other Structures, Such As Bailey And Wooden Bridges, Shallow Wells, Spring Developments, And Other Similar Structures: Two (2) Years. 10 A. Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within Not Applicable Days Of Delivery Of The Notice Of Award. Not Applicable Since The End-user, Municipal Engineering Office, Was The One Who Made The Program Of Work(pow). 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is Not Applicable. Reason Was Stated In 11.1. 13 The Amount Of The Advance Payment Shall Not Exceed 15% Of The Total Contract Price And Schedule Of Payment. 14 15.1 The Date By Which Operating And Maintenance Manuals Are Required Is 90 Calendar Days After The Commencement Of Works. The Date By Which “as Built” Drawings Are Required Is 90 Calendar Days After The Commencement Of Works. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Not Applicable. Section Vi. Specifications Specifications Is Provided In The Program Of Work(pow) And Detailed Estimates Section Vii. Drawings Please Seek The Drawings At The Office Of The Municipal Engineer Of Local Government Unit Of Irosin. Section Viii. Bill Of Quantities Improvement/upgrading Of Super Health Center Item No. Scope Of Work Quantity Unit 1.direct Cost(dc) I Forms And Scaffolding Works 1.00 Lot Ii Rsb Works 166.00 Kgs Iii Concrete Works 5.00 Cu.m. Iv Tile Works 205.00 Sq.m. V Ceiling Works 335.24 Sq.m. Vi Electrical Works 1.00 Lot Vii Painting Works 1.00 Lot Viii Doors And Windows 1.00 Lot Ix Canopy Works 1.00 Lot X Other Works 1.00 Lot Spl-1 Amenities 1.00 Lot Spl-2 Ppe’s 1.00 Lot Spl-3 Project Signage 1.00 Lot 2 Indirect Cost(ic), Contractor’s Mark-up 2.1 Contractor’s Profit(10% Of Direct Cost) 2.2 Ocm(15% Of Direct Cost) 2.3 Vat Component (5% Of Contractor’s Profit+dc+ocm) 2.4 Mobilization Total Cost Of All Line Item Includes Cost Of Contractor’s Profit, Taxes And Ocm. Attached Detailed Cost Estimates Section Ix. Bidding Forms Table Of Contents Bid Form Form Of Contract Agreement Omnibus Sworn Statement Affidavit Of Site Inspection Bid Securing Declaration Bid Form Date: Project Id No.: Infr-05-2025 To: [name And Address Of Procuring Entity] Having Examine The Philippine Bidding Documents(pbds) Including The Supplemental Or Bid Bulletin Numbers ______, The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Declare That: (a) We Have Reservation To The Pbds, Including The Supplemental Or Bid Bulletins, For The Procurement Projects, Improvement/upgrading Of Super Health Center; (b) We Offer To Execute The Works For This Contract In Accordance With The Pbds; (c) The Total Price Of Our Bid In Words And Figures , Excluding Any Discounts Offered Below Is (insert Information); (d) The Discounts Offered And The Methodology For Their Application Are: [insert Information) (e) The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: Value Added Tax, Income Tax, Local Taxes And Other Fiscal Levies And Duties Which Are Itemized Herein And Reflected In The Detailed Estimates; (f) Our Bid Shall Be Valid Within A Period Stated In The Pbds, And It Shall Remain Binding Upon Us At Any Time Before The Expiration Of That Period; (g) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract, Or A Performance Securing Declaration In Lieu Of The Allowable Forms Of The Performance Security, Subject To The Terms And Conditions Of Issued Gppb Guidelines For This Purpose; (h) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (i) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (j) We Understand That You Are Not Bound To Accept The Lowest Evaluated Bid Or Any Other Bid That You May Receive. (k) We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The Improvement/upgrading Of Super Health Center. (l) We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be Ground For The Rejection Of Our Bid. Name: Legal Capacity: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Contract Agreement For The Procurement Of Infrastructure Projects(revised) __________________________________________________________________________ This Agreement, Made This [insert Date] Day Of [insert Month], [insert Year] Between [name And Address Of Procuring Entity] (hereinafter Called The“entity”) And [name And Address Of Contractor] (hereinafter Called The “contractor”). Whereas, The Entity Is Desirous That The Contractor Execute [name And Identification Number Of Contract] (hereinafter Called “the Works”) And The Entity Has Accepted The Bid For [insert The Amount In Specified Currency In Numbers And Words] By The Contractor For The Execution And Completion Of Such Works And The Remedying Of Any Defects Therein. Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents As Required By The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 Shall Be Deemed To Form And Be Read And Construed As Part Of This Agreement, Viz.: A. Philippine Bidding Documents(pbds) I.drawings/plans; Ii.specifications; Iii.bill Of Quantities Iv.general And Special Conditions Of Contract; V.supplemental Or Bid Bulletins B. Winning Bidder’s Bid, Including The Eligibility Requirements, Technical And Financial Proposals, And All Other Documents Or Statements Submitted; Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes, And All Other Documents Submitted(e.g., Bidder’s Response To Request For Clarifications On The Bid), Including Corrections To The Bid, If Any, Resulting From The Procuring Entity’s Bid Evaluation; C. Performance Security D. Notice Of Award Of Contract And The Bidder’s Conforme Thereto; And E. Other Contract Documents That May Be Required By Existing Laws And/or The Procuring Entity Concerned In The Pbds. Winning Bidder Agrees That Additional Contract Documents Or Information Prescribed By The Gppb That Are Subsequently Required For Submission After The Contract Execution, Such As The Notice To Proceed, Variation Orders And Warranty Security, Shall Likewise Form Part Of The Contract. 3. In Consideration For The Sum Of [total Contract Price In Words And Figures) Or Such Other Sums As May Be Ascertained, [name Of Bidder] Agrees To Execute The Works For The [state The Object Of The Contract] In Accordance With His/her/its Bid. 4. The [name Of The Procuring Entity] To Pay The Above-mentioned Sum In Accordance With The Terms Of Bidding. In Witness, Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Binding Signature Of The Procuring Entity: Binding Signature Of Contractor: Insert Name And Signature] [insert Name And Signature] [insert Signatory’s Legal Capacity] [insert Signatory’s Legal Capacity] Signed In The Presence Of: ______________________ ________________ Municipal Engineer Liaison Officer For: For: [insert Procuring Entity] [insert Name Of Supplier] Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Contract Agreement And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. This Instrument Consists Of ____ Pages Including This Page On Which The Acknowledgement Is Written Duly Signed By The Contracting Parties And Their Witnesses. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Omnibus Sworn Statement(revised) Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g. Duly Notarized Secretary’s Certificate, Board/partnership Resolution Or Special Power Of Attorney, Whichever Is Applicable]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For And In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay, Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Of Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling(estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 Series Of 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This ___________ Day Of __________________, 2025 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. ______________ Page No: ______________ Book No. ______________ Series Of 2025. Infr-05-2025 Improvement/upgrading Of Super Health Center Irosin, Sorsogon Standard Form Number: Sf-infr-51 Revised On: August 11, 2004 Affidavit Of Site Inspection I, ________________________, Of Legal Age, _____________, Filipino And Residing At __________________________, Under Oath, Hereby Depose And Say: 1. That I Am The _________________________ Of The ____________________________________________, With Office Address At ______________________________; 2. That I Have Inspected The Site For Improvement/upgrading Of Super Health Center; 3. That I Am Making This Statement As Part Of The Requirement For The Technical Proposal Of The _________________________ Of ___________________________. In Faith Whereof, I Hereby Affix My Signature This ______ Day Of ________, 2025 At _________________________, Philippines. ___________________ Affiant Subscribed And Sworn To Before Me This ____ Day Of _________ 2025, Affiant Exhibiting To Me His/her Community Tax Certificate No. _______________ Issued On ________________ At ______________________________, Philippines. _______________________ Notary Public Until ______________ Ptr No. ______________ Date ______________ Place ______________ Tin ______________ Doc No. __________ Page No. _________ Book No. _________ Series Of _________. Republic Of The Philipppines ) City Of Sorsogon ) S.s. X ---------------------------------------------------x Bid Securing Declaration Project Identification No. Infr-05-2025 To: [insert Name And Address Of Procuring Entity] I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two(2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen(15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1(f) Of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid-securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am Declared Ineligible Or Post Disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And (c) I Am/we Declared As The Bidder With The Lowest Calculated And Responsive Bid And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I Have Hereunto Set My Hand This _____ Day Of ________, 2025 At __________________. _____________________________________ Bidder’s Representative/authorized Signatory [insert Signatory’s Legal Capacity] Affiant Acknowledgement Before Me, As The Notary Public For And In The City/municipality Of _____________, Personally Appeared _________________, Representing The ________________________ With _____________ Issued On __________ At __________________ And ___________________, _____________________ Representing ________________________ With ______________________ Issued On _________________ At __________________________, Known To Me The Same Persons Who Executed The Foregoing Document And They Acknowledged To Me That The Same Are Their True Act And Deed For And In Behalf Of The Parties They Represent. In Witness Whereof, I Have Hereunto Affixed My Signature And Seal This _______ Day _____________, Philippines. Doc. No. __________ Page No. __________ Book No. __________ Series Of 2025.
Closing Date18 Feb 2025
Tender AmountPHP 1.8 Million (USD 31.2 K)
PROVINCE OF ZAMBOANGA DEL NORTE Tender
Civil And Construction...+1Building Construction
Corrigendum : Closing Date Modified
Philippines
Details: Description Republic Of The Philippines Province Of Zamboanga Del Norte Bids And Awards Committee Provincial Capitol, Estaka, Dipolog City Email Add: Bidsandawards22@gmail.com December 04, 2024 Invitation To Bid The Provincial Government Of Zamboanga Del Norte Through The Bids And Awards Committee (bac) Is Inviting Interested Parties/ Bidders To Bid For The Following Contract: Contract Id: Pr#300/200 - 24-12-485(o) Contract Name: Construction Of Nala Elementary School Outdoor Stage And Dressing Room (phase 1), Municipality Of Sibuco, Zamboanga Del Norte Location/purpose: For The Use In The Construction Of Nala Elementary School Outdoor Stage And Dressing Room (phase 1), Municipality Of Sibuco, Zamboanga Del Norte Approved Budget For The Contract (abc): P1,499,999.73 (inclusive Of All Applicable Taxes) Bidders/ Contractors Must Have An Expertise In Undertaking A Similar Project, Completed At Least Two Similar Contracts Which The Equivalent Amount Is At Least 50% Of The Proposed Project For Bidding Within The Last Three Years. Bidders Are Inform That The Delivery Term Is 75 Calendar Days Upon Receipt Of Notice To Proceed. Bidders/ Contractors Shall Submit Their One (1) Copy Sealed Envelope Containing Their Technical And Financial Documents Documents Submitted Must Be In Accordance With The Checklist Provided And Must Have A Corresponding Label Or Name Plates. The Eligibility Check/ Screening As Well As The Preliminary Examination Of Bids Shall Use The Non- Discretionary "pass/ Fail" Criteria. Post Qualification Of The Lowest/ Single Bids Shall Be Conducted. All Particulars Relative To Eligibility Statement And Screening, Bid Security, Performance Security, Evaluation Of Bids, Post Qualification And Award Of The Contract Shall Be Governed By The Pertinent Provision Of Ra 9184 And Its Implementing Rules And Regulations (irr). All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms In The Amount Stated In Itb Clause 14. Bidding Is Restricted To Filipino Citizens/ Sole Proprietorships, Partnerships Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. The Schedules Of Activities Are Listed As Follows: Bac Activities Schedule Advertisement / Posting December 05 - 11, 2024 Pre-bid Conference December 12, 2024 @09:00am Availability And Issuance Of Bidding Documents December 05 - 27, 2024 @ 08:30am Deadline For The Submission Of Bids December 27, 2024 @ 08:30am Bid Opening And Evaluation December 27, 2024 @ 09:00am Payment For Bidding Documents Is A Non- Refundable Amount Of Five Thousand Pesos Only (php5,000.00) Payable To The Office Of The Provincial Treasurer, Provincial Capitol Building, Dipolog City. Prospective Bidders May Obtain Further Information From The Office Of The Bids And Awards Committee, Provincial Capitol Building During Office Hours @ 8:00am - 5:00pm. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Address Stated Above. The Provincial Government Of Zamboanga Del Norte Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Bidding Documents Will Be Electronically Uploaded To The Philgeps Website Of The Provincial Office Of Zamboanga Del Norte At Bidsandawards22@gmail.com. Atty. Rafael R. Osabel, Jr. Bac Chairman Annex: Construction Of Nala Elementary School Outdoor Stage And Dressing Room (phase 1), Municipality Of Sibuco, Zamboanga Del Norte Pr#300/200-24-12-485(o) Abc: P1,499,999.73 Item Activity Description Unit Qty Part A Other General Requirements A.1.4(1) Provision Of Progress Photograps Ea 63.00 A.1.1(3) Provision Of Field Office For The Engineers L.s 1.00 Part B General Requirements B.3 Permits And Clearances L.s 1.00 B.5 Project Billboard/signboard Ea 1.00 B7(2) Occupational Safety And Health Program L.s 1.00 B.9 Mobilization/demobilization L.s 1.00 Part C Civil, Structural, Architectural & Metal Works 803(1)a Structure Excavation (common Soil) M3 41.54 804(4) Gravel Bedding M3 11.43 804(1)b Embankment From Common Borrow M3 45.00 900(1)c2 Structural Concrete For Footing And Slab On Fill (class A, 28 Days) M3 12.45 900(1) Structural Concrete For Footing Tie Beam, Column, Suspended Slab, Girder/beam (class A, 28 Days) M3 9.57 902(1) Reinforcing Steel Of Reinforced Concrete Structures For One-storey, Grade 40/grade 60 Kg 1,644.96 903(2) Formworks And Falseworks (for One-storey Building) Sq.m 69.06 Part D Architectural / Finishing Works 1008 Aluminum Glass Window (sliding/casement/awning/fixed Type) M2 9.96 1010(1) Frames (jambs, Still, Head, Transoms And Mullions) Set 6.00 1010(2)b Wooden Panel Door M2 3.78 1043(1) Pvc Doors And Frames M2 2.52 1004(2) Finishing Hardware Set 4.00 1013(2) Fabricated Metal Roofing Accessory (ridge/hip Rolls/flashing/counter Flashing/valley Roll) M 7.40 1014 Prepainted Metal Sheets (rib Type, Long Span, Below .427 Thk/above .427 Thk) M2 136.90 1027(1) Cement Plaster M2 293.03 1046 100mm Chb Non-load Bearing/load Bearing (including Reinforcing Steel) M2 189.36 1047(2)b Structural Steel Roof Truss Kg 2,021.12 1047(2)c Structural Steel Purlins Kg 360.75 1047(3)b Metal Structure Accessories (sagrods) Pc 33.00 1047(3)c Metal Structure Accessories (turnbuckles) Pc 4.00 Part E Electrical Works 1100 Junction/utility/pull/square Box L.s 1.00 1100(30) Conduit Works, Boxes And Fittings L.s 1.00 1100(6)a 15mmø – 32mmø Polyvinyl Chloride (pvc) Pipes Length 32.00 1100(6)b 15mmø – 32mmø Polyvinyl Chloride (pvc) Pipes Length 5.00 1101 Switches Set 3.00 1101 Switches Set 3.00 1101 Duplex Convenience Outlet Set 10.00 1101(2) 1.60mm2 – 5.5mm2 Electric Wire (tw/thhn/twhn2) M 140.00 1101(2) 8.00mm2 – 22mm2 Electric Wire (tw/thhn/twhn2) M 30.00 1102 Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50amp – 200amp Set 1.00 1103(5) Downlight/pinlight Fixture With One-compact Fluorescent Lamp(cfl) Or Led Bulb, 1 Bulb Set 20.00 Part F Plumbing Works 1001(8) Sewer Line Works L.s 1.00 1002(4)a 65mmø-100mmø Polyvinyl Chloride (pvc) Pipe, Blue Pc 12.00 1001(1)a 50mmø-100mmø Pvc Pipe, Series 600/series 1000 M 9.00 1002(5) Water Closet/urinal With Complete Accessories Set 1.00 1002(5) Wall Hung Lavatory With Complete Accessories Set 1.00 1002(5) Faucet Pc 1.00 1002(5)h Floor Drain Plates Set 1.00 ***nothing Follows***
Closing Date13 Jan 2025
Tender AmountPHP 1.4 Million (USD 25.6 K)
Department Of Agriculture Tender
Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Philippines
Details: Description Section I. Invitation To Bid Da8-infra-2025-12 (pr No. Bt-25-infra-rice-39835-0009) 1. The Department Of Agriculture-regional Field Office No. 8, Through The Rice 2025-current Fund Intends To Apply The Sum Of Two Million Four Hundred Seventy-five Thousand Two Hundred Forty-one Pesos And 77/100 Only (p2,475,241.77) Being The Approved Budget For The Contract (abc) To Payment For The Contract For “supply Labor And Materials For The Construction Of Warehouse Located At Brgy. Hinulogan, Dagami, Leyte”. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Regional Field Office Viii Now Invites Bid For The Above Procurement Project. Completion Of Works Is Required Within Eighty-four (84) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii: Instruction To Bidders Qty Uom Desription Total Cost Supply Of Labor And Materials For The Rehabilitation Of Warehouse Located At Brgy. Hinulogan, Dagami, Leyte. P2,475,241.77 1 L.s. Permits And Clearances 96 Sq.ft Signboard/billboard 1 L.s. Removal Of Structure 2161.74 Kgs. Reinforcing Steel 10.42 Cu.m. Reinforced Concrete 1 L.s. Formworks And Falseworks 9.09 Sq.m. Masony Works 349.5 Sq.m. Cement Plaster Finish 283.3 Sq.m Metal Structures 283.3 Sq.m Prepainted Metal Roofing 42 Sq.m Ceramic Tiles 45 Sq.m Carpentry And Joinery Works 14 Sets Aluminum Screen And Aluminum Glass Windows 4 Sets Doors 1 Sets Fabricated Sliding Steel Door 1 L.s. Conduits, Boxes & Fittings 1 L.s. Wires & Wiring Devices 1 L.s. Power Load Center Switch Gear & Panel Board 16 Sets Lighting Fixtures 436.26 Sq.m. Painting 1 Sq.m. Brass Marker Terms And Conditions: A During The Opening Of Bids, Bidders Shall: 1. Submit Certificate Of Project Site Inspection Issued By Farmer’s Association Or Barangay Officials Or Affidavit Of Site Inspection; 2. Submit Certificate Of Compliance To The Attached Drawings Duly Signed By The Bidder’s Authorized Representative And Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; B All Participating Bidder Must Comply With Section B Of Dpwh D.o. No. 197 Series Of 2016, Particularly In The Computation Ocm & Profit Of The Bid Amount. Use 12% For Vat Mark-up C During Post-qualification Evaluation 1. In Case Of Recomputed Bid, Bidder Shall Submit Its Revised Cost Estimates 2. Submit Pert/cpm And S-curve 3. Construction Methods 4. Manpower Schedule 5. Major Equipment Schedule 6. Provide Contractor's All Risk Insurance (cari) 7. Submit Plans, Design, And Specification Signed And Sealed By A Licensed Agricultural Engineer/ Agricultural And Biosystems Engineer; D Winning Bidder Shall: 1. Commence Construction Works Within Seven (7) Days Upon Receipt Of Notice To Proceed (ntp); 2. Complete The Construction Within 84 Calendar Days; 3. Provide Necessary Tools For The Satisfactory Completion Of The Project; 4. Assume Full Responsibility From The Time Project Construction Commences Up To The Final Acceptance By Darfo 8 And Shall Be Held Responsible For Any Damage In Part Or In Whole Except Those Occasioned By Force Majeure; 5. Assign A Project Engineer (either Licensed Agricultural Engineer Or Civil Engineer) That Will Oversee The Daily Construction Activities On Site; 6. Comply With The Quality Control Program (qcp) Schedule Of Minimum Testing Requirements Of The End-user; 7. Submit Material Test Report Or Its Equivalent Standard Certificate For Aggregate (sand & Gravel), And Cement 8. Submit Material Test Result From Accredited Testing Laboratory For Concrete, And Reinforcing Bar With Geotagged Photos, If Applicable; 9. Attend Pre-construction Meeting. 10. In Case Of Time Extension Due To Unworkable Weather Condition, Submit The Request With Pag-asa Weather Report And On-site Weather Chart Within The Succeeding Month. 11. Secure And Facilitate The Necessary Permits Required For The Project Implementation. 12. Strictly Observe Construction Safety Rules And Health Program Approved By Department Of Labor And Employment (dole) During Project Implementation. E Any Delay In The Project Completion Shall Be Subjected To Liquidated Damages Equivalent To At Least 1/10 Of 1% Of The Cost Of The Unperformed Portion Of The Works For Everyday Of Delay F Be Paid Through Partial Billing Based On Validated/verified Statement Of Work Accomplishment (swa) With Geo-tagged Photos On Major Works (before, During, And After) And Inspection Report By The Da-rfo8 Inspectorate Team. 1. At Least 30% Of The Physical Accomplishment; 2. At Least 70% Of The Physical Accomplishment; 3. 100% Of The Physical Accomplishment, Inspection And Acceptance Of The Project G Advance Payment (maximum Of 15%) Will Be Granted Upon Submission Of The Following Requirements: 1. Advance Payment Bond By The Bidder 2. On-site Evaluation Report By The Da Project Engineer H Winning Bidder Shall Submit A Snapshot Of A Business Bank Account (preferably Landbank) To Effect Payment. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information From Department Of Agriculture – Regional Field Office 8 And Inspect The Bidding Documents At The Address Given Below During Office Hours, From 8:00 Am To 5:00 Pm 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 21, 2025 To February 11, 2025 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents Amounting To Five Thousand Pesos Only (p5,000.00), Pursuant To The Latest Guidelines Issued By The Gppb. 6. The Department Of Agriculture-rfo 8 Will Hold A Pre-bid Conference On January 28, 2025 9:00 Am At Bac Office, Da-rfo8, Kanhuraw Hill, Tacloban City Through Face To Face Or Videoconferencing/webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before February 11, 2025, 9:00 Am (bac-secretariat Time). Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On February 11, 2025, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity Either Physically Or Through Videoconferencing Via Google Meet. 10. The Department Of Agriculture-rfo 8 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. Da Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 12. For Further Information, Please Refer To: Martins A. Alde Head, Bac-secretariat Department Of Agriculture, Regional Field Office-8 Kanhuraw Hill, Tacloban City Darfo8.bacsec@gmail.com Mobile No. 09061694318 Easternvisayas.da.gov.ph 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.philgeps.gov.ph Or Easternvisayas.da.gov.ph Approved By: (sgd.) Larry U. Sultan, Jd Chairman, Bids And Awards Committee
Closing Date12 Feb 2025
Tender AmountPHP 2.4 Million (USD 42.6 K)
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY USA Tender
Plastic and Rubber
United States
Details: The Purpose Of This Sources Sought Notice Is To Conduct Market Research And Identify Potential Sources Of Commercial Products/services That Satisfy The Government’s Anticipated Needs.
background
the National Institute Of Standards And Technology (nist), Gaithersburg 731.07 Group Within The Engineering Laboratory Is Seeking A Highly Accelerated Stress Test (hast) Chamber Capable Of Meeting The Jesd22a110e Standard To Perform Accelerated Aging Experiments As Part Of A Study Of Long-term Reliability Of Materials Used In Advanced Packaging Of Semiconductor Chips. This Work Is In Support Of The Chips Metrology Program.
the Chips Metrology Program Develops And Advances Cutting Edge Metrology Capabilities For Members Of The Us Semiconductor Manufacturing Ecosystem. This Nist Conducted Research Program Works With Device Manufacturers, Tool Vendors, Materials Suppliers, And Other Organizations To Address Critical Metrology Gaps To Spur Innovation Within Seven Grand Challenge Areas. For More Information On Chips Metrology, Please Visit Https://www.nist.gov/chips/research-development-programs/metrology-program
nist Is Seeking Information From Sources That May Be Capable Of Providing A Solution That Will Achieve The Objectives Described Above, In Addition To The Following Essential Requirements:
sample Types And Sizes
samples Will Include Films, Multilayered Film Structures, And Sectioned Wafers
materials To Be Aged Will Include Polymeric Components In Advanced Packaging, Including Underfill And Encapsulation Epoxies, Fiber Reinforced Polymer Substrates, Along With Thermal Interface Materials, Filler Components, Treated Substrates. These Materials May Be Standalone Films, Combined Into Multilayered Composites, Or Combined Into Assembled Semiconductor Structures As Part Of A Fabricated Test Vehicle.
largest Sample Size Is Expected To Be A Sectioned 300 Mm Wafer.
accelerated Stress Testing
oven Must Provide A Temperature Range Of At Least 105 °c To 162 °c.
oven Must Provide A Humidity Range Of At Least 75 % To 100 % Rh.
oven Must Provide A Pressure Range Of At Least 0.020 To 0.392 Mpa.
oven Must Be Able To Accommodate Applied Current/voltage To Samples During Testing. This Requires A Terminal Block To Allow For Connection With A Power Source. Indicate Number Of Terminals And All Voltage/current Limits.
indicate The Number Of Sensors, Their Locations, And The Temperature, Humidity, And Pressure Accuracy Of The Oven.
wire Port
sample Degradation Will Be Monitored During Thermal Aging. This Will Require A Pass-through Port To Allow For Monitoring Cables To Be Fed Through The Oven. The Pass-through Port Must Be 2-3” In Diameter. Multiple Pass-through Ports Of Smaller Size Will Also Be Considered. Provide These Details.
how To Respond To This Notice
in Responding To This Notice, Please Do Not Provide Proprietary Information. Please Include Only The Following Information, Readable In Either Microsoft Word 365, Microsoft Excel 365, Or .pdf Format, In The Response: Submit The Response By Email To The Primary Point Of Contact And, If Specified, To The Secondary Point Of Contact Listed In This Notice As Soon As Possible, And Preferably Before The Closing Date And Time Of This Notice. Please Note That To Be Considered For Award Under Any Official Solicitation, The Entity Must Be Registered And “active” In Sam At The Time Of Solicitation Response.
provide The Complete Name Of Your Company, Address, Name Of Contact For Follow-up Questions, Their Email, Their Phone Number And, If Your Company Has An Active Registration In Https://sam.gov, Your Company’s Unique Entity Id (uei).
identify The Equipment That Your Company Sells That Can Meet The Objectives Addressed In The Background Section Of This Notice. For Each Product Recommended To Meet The Government’s Requirement, Provide The Following:
manufacturer Name
model Number
technical Specifications
if Your Company Is Not The Manufacturer, Provide Information On Your Company’s Status As An Authorized Reseller Of The Product(s)
describe Performance Capabilities Of The Product(s) Your Company Recommends To Meet The Government’s Requirements. Additionally, If There Are Other Features Or Functions That You Believe Would Assist Nist In Meeting Its Objectives Described Above, Please Discuss In Your Response.
discuss Whether The Equipment That Your Company Sells And Which You Describe In Your Response To This Notice May Be Customized To Specifications And Indicate Any Limits To Customization.
identify Any Aspects Of The Nist Market Research Notice, Including Instructions, And Draft Minimum Specifications In The Background Section You Cannot Meet And State Why. Please Offer Suggestions For How The Market Research Notice And Draft Minimum Specifications Could Be Made More Competitive.
state Whether The Proposed Equipment Is Manufactured In The United States And, If Not, State The Name Of The Country Where The Equipment Is Manufactured.
identify Any Plans/possibilities For Changes In Manufacturing Location Of The Aforementioned Equipment And Provide Relevant Details, Including Timeline.
for The Naics Code Listed In This Notice:
indicate Whether Your Company Is (a) A Small Business Or (b) Other Than Small Business. See The Table Of Small Business Size Standards And The Associated .pdf Download File For Small Business Size Standards And Additional Information.
if You Believe The Naics Code Listed In This Notice Is Not The Best Naics Code For The Type Of Product Addressed In This Notice, Identify An Alternative Naics Code That You Believe Would Be More Appropriate For The Planned Procurement.
describe Services That Are Available With The Purchase Of The Aforementioned Equipment From Your Company Such As Installation, Training, And Equipment Maintenance.
describe Standard Terms And Conditions Of Sale Offered By Your Company For The Recommended Equipment Such As: Delivery Time After Your Company Accepts The Order; Fob Shipping Terms; Manufacturer Warranty (including Details Regarding Nature And Duration); If Available, Description(s) Of Available Extended Warranty; Equipment Setup And Test; Operator And Service Instruction Manual(s); Cleanup After Installation; And If Applicable, Other Offered Services. Provide A Copy Of Manufacturer Standard Terms And Conditions That Typically Relate To The Sale Of The Specified Equipment, If Available.
state Whether Your Company Offers Facility Renovation Services Related To Installation Of The Recommended Equipment At Its Delivery Destination, If Required Per The Nist-identified Minimum Specifications, And Provide Description Of Said Services. Indicate If Your Company Performs The Facility Renovation Services Or Typically Subcontracts The Work To Another Company. Indicate If Your Company Would Be Interested In Inspecting The Intended Installation Site During The Market Research Phase.
state Published Price, Discount, Or Rebate Arrangements For Recommended Equipment And/or Provide Link To Access Company’s Published Prices For Equipment And Services.
if The Recommended Equipment And Related Services Are Available For Purchase On Any Existing Federal Supply Schedule Contract(s) Or Other Contracts Against Which Nist May Be Able To Place Orders, Identify The Contract Number(s) And Other Relevant Information.
identify Any Customers In The Public Or Private Sectors To Which You Provided The Recommended Or Similar Equipment. Include Customer(s) Information: Company Name, Phone Number, Point Of Contact, Email Address.
provide Any Other Information That You Believe Would Be Valuable For Nist To Know As Part Of Its Market Research For This Requirement.
state If You Require Nist To Provide Additional Information To Improve Your Understanding Of The Government’s Requirement And/or Would Like To Meet With Nist Representatives To Discuss The Requirement And The Capabilities Of The Identified Equipment.
questions Regarding This Notice
questions Regarding This Notice May Be Submitted Via Email To The Primary Point Of Contact And The Secondary Point Of Contact Listed In This Notice. Questions Should Be Submitted So That They Are Received 5 Calendar Days Prior To The Response Date. If The Contracting Officer Determines That Providing A Written Amendment To This Notice To Document Question(s) Received Would Benefit Other Potential Respondents, The Questions Would Be Anonymized, And A Written Response To Such Question(s) Would Be Provided Via An Amendment To This Notice.
important Notes
this Notice Is For Market Research Purposes And Should Not Be Construed As A Commitment By Nist To Issue A Solicitation Or Ultimately Award A Contract. There Is No Solicitation Available At This Time.
this Notice Does Not Obligate The Government To Award A Contract Or Otherwise Pay For The Information Provided In Response.
nist Reserves The Right To Use Information Provided By Respondents For Any Purpose Deemed Necessary And Legally Appropriate.
any Organization Responding To This Notice Should Ensure That Its Response Is Complete And Sufficiently Detailed To Allow The Government To Determine The Organization’s Capability.
respondents Are Advised That The Government Is Under No Obligation To Acknowledge Receipt Of The Information Received Or Provide Feedback To Respondents With Respect To Any Information Submitted.
after A Review Of The Responses Received, A Synopsis And Solicitation May Be Published On Gsa’s Ebuy Or Sam.gov. However, Responses To This Notice Will Not Be Considered An Adequate Response To Any Such Solicitation(s).
thank You For Taking The Time To Submit A Response To This Request!
Closing Date13 Feb 2025
Tender AmountRefer Documents
Department Of Agriculture Tender
Machinery and Tools...+1Automobiles and Auto Parts
Corrigendum : Tender Amount Updated
Philippines
Details: Description Section I. Invitation To Bid Da8-goods-2025-25 (id No Bt-25-goods-. Hvcdp -41917-0004) 1. The Department Of Agriculture-regional Field Office No. 8, Through The Hvcdp 2025 Current Fund Intends To Apply The Sum Of Nine Million Three Hundred Forty-four Thousand Five Hundred Sixty Pesos Only (p9,344,560.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For “supply And Delivery Of Various Garden Tools” Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture-regional Field Office No. 8, Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required Within Thirty (30) Calendar Days From Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. Qty Uom Item Description Unit Cost Total Cost Lot 1: 2884,560.00 408 Pcs. Bolo, (2.5" Width, 8 "long Excluding Wooden Handle), Fabricated, Made Of Leaf Spring 400 163,200.00 408 Pcs Garden Hoe With Handle (head - 230 X 175mm, 1.360g In Forged Steel, With Varnished Hard Wood Handle Length Approx. 110-120cm, Blade Edge) 450 183,600.00 136 Roll Garden Hose With Nozzle, High Quality, 90 Meters 1/2" Diameter 2,500.00 340,000.00 272 Pcs. Pick Mattock (blade Edge And Pick Made Of Durable Forged Steel, Hard Wood Handle) 450 122,400.00 544 Pcs. Plastic Water Sprinkler 8 Liters Capacity) 350 190,400.00 544 Pcs. Potting Medium (carbonized Rice Hull), 5kg Per Bag 400 217,600.00 544 Pcs. Pruning Shears, 7 1/2" High Carbon Steel Blades, Stainless Steel Spring, Locking Feature For Storage And Safety 600 326,400.00 408 Pcs. Rake, 14'' Straight, Heavy Duty With 48'' Steel Handle 400 163,200.00 3808 Pcs. Seedling Tray (105 Holes) Made Of Plastic Materials 95 361,760.00 408 Pcs. Spade With D-handle (48"long, 23cm Wide Blade, High Strength Steel Handle, High Impact D-grip, Heavy Duty) 450 183,600.00 272 Pcs. Spading Fork (42"long, Steel Handle, With 4 Forged Steel Tines With 7" Wide And 10" Long, 4-5 Lbs Weight) 450 122,400.00 136 Roll Culture Net Or Trellising Net, 7" X 7" Grid X 2.4m X 100m/ Nylon Net 3,000.00 408,000.00 408 Pcs. Trowel, Metal, 12 X 3, Painted 250 102,000.00 Lot 2: 2,992,000.00 272 Roll Fine Net (black), 54 Mesh Or 80% Shading, 1.2m X 100m 7,000.00 1,904,000.00 272 Roll Plastic Mulch, Black, 1.20m X 0.03mm X 400 Meters 4,000.00 1,088,000.00 Lot 3: 3,468,000.00 136 Pcs. Hdpe Plastic Drum With Cover, Open Top, 200 Li Capacity, Blue 3,500.00 476,000.00 408 Pcs. Pressure Sprayer, Heavy Duty, Semi Automatic, 3.0l Cap Pump-top, Hard Plastic Tank, Compatible With Common Sanitizers. Disinfectants, Alcohol, And Even Fertilizers, And Pesticides 600 244,800.00 136 Pcs. Uv Film, 110" X 0.005" X 150; Polyethylene; 150 Microns Thickness 16,000.00 2,176,000.00 3808 Pcs Hdpe Plastic Pots, 30cm Dia., 2mm Thickness, Durable And Thick Material 150 571,200.00 Terms And Conditions: A During The Opening Of Bids, Bidder/s Shall: 1. Submit Duly Notarized Affidavit Of Stock Suffiency; 2. Bidder/s May Indicate The Brand That They Offered; B Winning Bidder/s Shall: 1. Deliver New Items To Abuyog Experiment Station, Abuyog, Leyte 2. Deliver The Items 30 Calendar Days Upon Receipt Of Ntp; 3. Inform The Gss Section And End User One (1) Week Before The Delivery Schedule; 4. Present Sample Of Items To The End User Before The Delivery; 5.deliver The Items As Specified In The Contract Of Agreement; 6. Assemble The Items (specifically Garden Hoe And Pickmattock) During The Delivery To The Drop-off Point (abuyog Experiment Station, Abuyog, Leyte) C Any Delay Of Delivery Of The Item Shall Be Subjected To Liquidated Damages Equivalent To 1/10 Of 1% Of The Contract Price Per Day Of Delay Of The Undelivered Items; D Payment Shall Be Made After Complete Delivery, Inspection, Acceptance And Submission Of All Necessary Documents Required For The Processing Of The Payment; E Winning Bidder Shall Submit A Snapshot Of A Business Bank Account (preferably Landbank) To Effect Payment. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The Irr Of Ra 9184. 4. Prospective Bidders May Obtain Further Information From Department Of Agriculture – Regional Field Office 8 And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8:00am To 5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 24, 2025 To February 12, 2025 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee Pursuant To The Latest Guidelines Issued By The Gppb. The Cost Of The Bidding Documents Shall Correspond To The Total Abc Of The Selected Lots/s On Which The Supplier Intends To Bid, With A Range As Indicated In The Table Below. Approved Budget For The Contract Maximum Cost Of Bidding Documents (in Philippine Peso) 500,000 And Below 500.00 More Than 500,000 Up To 1 Million 1,000.00 More Than 1 Million Up To 5 Million 5,000.00 6. The Department Of Agriculture-rfo 8 Will Hold A Pre-bid Conference On January 31, 2025, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City And Through Face To Face Or Video Conferencing Or Webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before February 12, 2025, 9:00 Am (bac-secretariat Time). Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On February 12, 2025, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend Either Physically Or Through Video Conferencing Via Google Meet. 10. The Department Of Agriculture-rfo 8 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. Da Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 12. For Further Information, Please Refer To: Martins A. Alde Head, Bac-secretariat Department Of Agriculture, Regional Field Office-8 Kanhuraw Hill, Tacloban City Darfo8.bacsec@gmail.com Mobile No. 09061694318 Easternvisayas.da.gov.ph 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.philgeps.gov.ph Or Easternvisayas.da.gov.ph Approved By: (sgd.) Larry U. Sultan, Jd Chairman, Bids And Awards Committee
Closing Date12 Feb 2025
Tender AmountPHP 9.3 Million (USD 161 K)
4161-4170 of 4221 archived Tenders