Fabrication Tenders

Fabrication Tenders

Department Of Public Works And Highways Tender

Civil And Construction...+1Building Construction
Corrigendum : Closing Date Modified
Philippines
Closing Date30 Jan 2025
Tender AmountPHP 9.6 Million (USD 164.5 K)
Details: Description Republic Of The Philippines Department Of Public Works And Highways Regional Office Ii Dalan Na Pavvurulun, Rgc, Carig Sur, Tuguegarao City, Cagayan Invitation To Bid For 24b00131 (re-advertisement) : Construction/ Rehabilitation/ Improvement Of Facilities For Persons With Disabilities: (pwds) And Elderlies/ Senior Citizens - Including Gender-responsive Facilities - Region Ii 1. The Dpwh Regional Office Ii, Through The Ra 11975 (gaa Fy 2024) Intends To Apply The Sum Of ₱9,650,000.00 Being The Approved Budget For The Contract (abc) To Payments Under The Contract 24b00131: Construction/ Rehabilitation/ Improvement Of Facilities For Persons With Disabilities: (pwds) And Elderlies/ Senior Citizens - Including Gender-responsive Facilities - Region Ii. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Dpwh Regional Office Ii Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: Name Of Contract : Construction/ Rehabilitation/ Improvement Of Facilities For Persons With Disabilities: (pwds) And Elderlies/ Senior Citizens - Including Gender-responsive Facilities - Region Ii Contract Id No. : 24b00131 Location : Brgy. Lullutan, Ilagan City, Isabela Brief Project Description : 2 Storey Senior Citizens Building (12.00m X 16.25m) Whole Building Earthworks, Plain And Reinforced Concrete Works, Finishing And Other Civil Works, Electrical Works, Plumbing Works, Electronics Works And Mechanical Works (1-7.2kw /3 Ton Cabinet Type Floor Mounted Airconditioner,1 Phase Power Supply With Minimum Cooling Capacity Of 25,000 Btu/hr, Inverter, Including Copper Tubing, Steel Bracket, Hardware And Accessories) Not Included In Finishing Works(second Floor Cr Modular Partition, Built-up Preformed Membrane At Second Floor Cr, Unglazed Tiles At Second Floor Including Wall Of Cr, Painting Works Of Interior Of Second Floor Wall And Ceiling, Railings Of Stairs(main Stair And Exit Stair), Electrical Works(second Floor Interior Lighting Fixtures), Mechanical Works (second Floor Exhaust Fan Fixture, And All Airconditioning Unit Except The Above Mentioned) Plumbing Works( Catch Basin And Drain Pipes Connecting Each Catch Basin) Scope Of Works : Other General Requirements • Permits And Clearances • Project Billboard / Signboard • Occupational Safety And Health Program • Mobilization / Demobilization Earthworks • Structure Excavation (common Soil) • Embankment (from Structure Excavation & Borrow) • Gravel Fill Plain And Reinforced Concrete Works • Structural Concrete, 3000 Psi, Class A, 28 Days • Reinforcing Steel (deformed) Grade (40 And 60) • Formworks And Falseworks Finishing And Other Civil Works • Soil Poisoning • Ceiling • Modular Partition • Finishing Hardware • Aluminum Framed Glass Doors (sliding & Swing Type) • Aluminum Glass Windows, (sliding, Casement, Awning & Fixed) Type • Doors, (wood Panel) • Roll-up Door (steel) • Fabricated Metal Roofing Accessory, Gauge 26, 0.60 Mm, (ridge/hip Rolls • Prepainted Metal Sheets (rib Type, Long Span,0.6mm Thk) • Waterproofing Cement-base • Built-up And Preformed Membrane • Unglazed Tiles • Cement (floor & Plaster) Finish • Decorative Stones • Painting Works, (masonry/concrete & Steel) • Reflective Insulation • Chb Non-load Bearing (including Reinforcing Steel) (100 Mm & 150mm) • Metal Structure Accessories, (turnbuckle, Bolts And Rods, Sagrods, Cross Bracing & Steel Plates) • Structural Steel (trusses & Purlins) • Railing • Storm Drainage And Downspout • Sewer Line Works • Septic Vault (chb/ Concrete) • Sanitary/plumbing Fixtures • Cold Water Lines Electrical Works • Conduits, Boxes & Fittings (conduit Works/conduit Rough-in) • Electric Wire • Single Pole Wall Switch On One Switch Plate • Duplex (2 Single Pole Wall Switches On One Switch Plate) • Triplex (3 Single Pole Wall Switches On One Switch Plate) • Three (3) - Way Switch • Single Convenience Outlet/receptacle, Grounding Type (gt) • Duplex Convenience Outlets/receptacles (gt) • Panelboard With Main & Branch Breakers • Lighting Fixtures Mechanical Works • Exhaust Fan, (ceiling Cassette) • Air Conditioning System Approved Budget For The Contract (abc) : ₱9,650,000.00 Contract Duration : 120 Calendar Days Inclusive Of 8 Unworkable/rainy Days, 26 Sundays And Holidays 2. The Major Category Of Work For The Project Is Bicwoplc - Buildings: Construction-without Piles-low Rise-concrete Frame(1 To 5 Storey ). 3. Prospective Bidders Should Be Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Size Range Of At Least Small B For Buildings. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 4. Pursuant To Gppb Resolution No. 15- 2021 Dated October 14, 2021, Prospective Bidders Shall Submit In Their First Envelope The Updated Philgeps Certificate Of Platinum Registration And Membership In Accordance With Sections 23.3, 24.4.3 And 54 Of Republic Act 9184 (ra9184), All Class “a” Eligibility Documents Covered By Section 8.5.2 Of The 2016 Revised Irr Of Ra 9184 Supporting The Veracity, Authenticity And Validity Of The Certificate Shall Remain Current And Updated, And That Failure By The Prospective Bidder To Update Its Philgeps Certificate Of Platinum Registration And Membership With The Current And Updated Class “a” Eligibility Documents Covered By Section 8.5.2 Of The 2016 Revised Irr Of Ra 9184 Shall Result In The Automatic Suspension Of The Validity Of Its Certificate Of Platinum Registration And Membership Until Such Time That All Of The Expired Class “a” Eligibility Documents Has Been Updated. 5. Bidders Are Required To Update Their Existing Philgeps Registration (platinum) In The Dpwh Civil Works Registry Prior To The Scheduled Receipt And Opening Of Bids. 6. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The "“government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 7. Interested Bidders May Obtain Further Information From The Dpwh Regional Office Ii And Inspect The Bidding Documents At Procurement Staff, 4th Floor, Dpwh Regional Office No. Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan During Weekdays From 8:00 A.m. To 5:00 P.m.. 8. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 09 - 30, 2025, From The Address Given Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Ten Thousand Pesos Only (₱10,000.00). Pursuant To Section 17. 5 Of The 2016 Revised Irr Of Ra 9184, Bidding Documents Fee May Be Refunded In Accordance With The Aforementioned Guidelines Based On The Grounds Provided For Under Section 41 Of Ra 9184 And Its Irr. 9. The Bidding Documents May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 10. The Dpwh Regional Office Ii Will Hold A Pre-bid Conference On January 16, 2025, 10:00 Am At The Procurement Conference Room, 4th Floor, Dpwh Regional Office Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan, And/or Through Webcasting Via Youtube Channel (dpwh Regional Office Ii Procurement Livestream) Which Shall Be Open To Prospective Bidders. Prospective Bidders Are Encouraged To Send Their Technical Personnel To Attend The Pre-bid Conference. 11. Bid Submission May Be Done Manually Or Electronically. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds Clause 17. 12. Bids Must Be Duly Received By The Bac Secretariat For Manual Submission At The Procurement Conference Room, 4th Floor, Dpwh Regional Office Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan Or At Electronicbids_r2@dpwh.gov.ph For Electronic Submission And Receipt Of Bids On Or Before January 30, 2025 At 10:00 Am. Late Bids Shall Not Be Accepted. 13. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Bds Clause 15.1. 14. Bid Opening Shall Be On January 30, 2025, Immediately After The Deadline For The Submission Of Bid At The Procurement Conference Room, 4th Floor, Dpwh Regional Office Ii Extension Bldg. 2, Regional Government Center, Carig Sur, Tuguegarao City, Cagayan. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 15. The Dpwh Regional Office Ii Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra 9184, Updated As Of July 19, 2024, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 16. You May Visit The Following Websites; For Downloading Bidding Documents: Dpwh Website: Www.dpwh.gov.ph Philgeps Website: Www.philgeps.gov.ph Livestreaming Website: Https://www.youtube.com/@dpwh.ro.2 For Online Bid Submission: Electronicbids_r2@dpwh.gov.ph 17. For Further Information, Please Refer To: Hilario Y. Casem Engineer Iv Head, Procurement Staff Dpwh Regional Office Ii Carig Sur, Tuguegarao City, Cagayan Contact No.: 0935-176-0624 Email Address: Casem.hilario@dpwh.gov.ph Bernard T. Calabazaron Chief, Qah Division Bac Chairperson Dpwh Regional Office Ii Carig Sur, Tuguegarao City, Cagayan Calabazaron.bernard@dpwh.gov.ph Date Of Posting: Dpwh And Philgeps Websites: January 09-15, 2025 Conspicuous Place (procurement Bulletin Board): January 09-15, 2025

Government Of New Brunswick Tender

Plastic and Rubber
Canada
Closing Date17 Jan 2025
Tender AmountRefer Documents 
Details: Bidders Are Requested To Include Specifications On Product Quoted With The Bid. This Procurement Is Subject To The Canadian Free Trade Agreement. When Stating "unit Price" On Bid Submissions, Vendors Are Required To Quote Pricings No More Than Four (4) Digit Positions After The Decimal Point. More Than 4 Digit Positions After The Decimal Point Will Be Rounded-off To The Fourth Position. New Brunswick Manufacturer Preference By Stating Yes In The Input Box, I Confirm That I Am A Manufacturer Of Goods With A Place Of Business In New Brunswick As Defined Below And Am Therefore Eligible To Be Considered For The Nb Manufacturer Preference As Defined In This Solicitation Document. If The Input Box Is Left Incomplete The Bid May Be Ineligible For The New Brunswick Manufacturer Preference. Place Of Business Means An Establishment Where A Manufacturer Regularly Conducts Its Activities On A Permanent Basis, Is Clearly Identified By Name And Is Accessible During Normal Business Hours. New Brunswick Vendor Preference By Stating Yes In The Input Box, I Confirm That I Am A Vendor Of Goods Or Services With A Place Of Business In New Brunswick As Defined Below And Am Therefore Eligible To Be Considered For The Nb Vendor Preference As Defined In This Solicitation Document. If The Input Box Is Left Incomplete The Bid May Be Ineligible For The New Brunswick Vendor Preference. Place Of Business Means An Establishment Where A Vendor Regularly Conducts Its Activities On A Permanent Basis, Is Clearly Identified By Name And Is Accessible During Normal Business Hours. Plastics, Fabricated Materials Scope This Tender Consists Of The Supply, And Delivery Of Polyethylene Greenhouse Cover Film. Equivalent Products May Be Accepted Upon Review And Acceptance By The Department Of Natural Resources And Energy Development. Specifications See Item Description Below. Contract Award Criteria Compliant Bids Will Be Evaluated Based Upon The Lowest Total Price Bid That Meets The Specifications Listed Within This Document. If Bidder(s) Choose To Submit An 'equivalent Product', They Should Provide Product Specifications At The Time Of Bid Submission. How To Submit Pricing Vendors Are Invited To Submit Their Unit Price--the Price For A Single Product Within The Tender Item--under The 'unit Price Including Discount' Column. Vendors Should Then Multiply Their Unit Price By The 'quantity/unit' To Calculate The 'extended Price'. The 'unit Price Including Discount' And 'extended Price' Column Directly On This Invitation To Tender And Should Not Include Taxes. There Are No Additional Pricing Sheets To Be Completed With This Bid. Delivery Date And Price Vendor(s) Shall Deliver The Goods To The Shipping Address Detailed Above On Or Before April 10, 2025. Bids Must Include Pricing For Delivery To The Shipping Address Detailed Above. Deliveries Thereafter The Requested Date May Be Cancelled. Vendor Questions All Inquiries Should Be Received Seven (7) Calendar Days Prior To The Closing Date; Any Inquiries Received Less Than Seven (7) Calendar Days Prior To The Closing Date Cannot Be Guaranteed A Response. Please Reference The Tender Number And Closing Date Within Your Communications To Ensure A Prompt And Accurate Reply. Requirements Vendors Are Required To Sign And Date Their Bid In The Space Provided Below. This Is A Tender Notice Only. In Order To Submit A Bid, You Must Obtain Official Tender Documents From The New Brunswick Opportunities Network, Another Authorized Tendering Service Or As Indicated In The Tender Notice. Solicitation Documents Will Be Provided In Either Of The Province Of New Brunswick's Two Official Languages; English Or French Upon Request. Instructions For Bid Submission 1. Effective April 15, 2020, Service New Brunswick Is No Longer Accepting Paper Bids, And The Central Tendering Branch Is Closed To The Public. Public Tender Openings Are No Longer Taking Place; However, Results Continue To Be Posted On Nbon. 2. Bids Will Only Be Accepted By Electronic Transmission As Follows: A. By E-bidding Through Nbon (when E-bidding Is Possible); Or B. By Fax To: (506) 444-4200 (fax To Dedicated Mailbox). Note: Proposals In Response To A Request For Proposals (rfp) Will Not Be Accepted By Fax; Or C. By Email To Nbbids@snb.ca Or Soumissionsnb@snb.ca (do Not Submit Bids To Any Other Email). Click Here Instructions For Bid Submission For Important Instructions On How To Submit Bids By Email. D. Please Refrain From Submitting Your Bid Through Multiple Electronic Channels To Avoid Duplicate Bids. 3. All Bids Must Be Properly Signed By An Authorized Person. A. For Bids Submitted By Email Or Fax: Typed Signatures (in Any Font) That Are Not On The Bid Itself (i.e. In The Body Of The Email Or On The Fax Cover Sheet) Will Not Be Accepted. 4. All Bids Must Be Legible, Properly Completed And Contain The Proper Solicitation Number. 5. The Proponent Is Solely Responsible For Ensuring That The Bid Submission In Its Entirety, Including All Attachments, Is Received Before Closing Date And Time As Indicated On The Solicitation Documents. A. The Proponent Bears All Risk Associated With Delivering Its Bid By Electronic Submission, Including But Not Limited To Delays In Transmission Between The Proponent's Computer And The Province's Electronic Mail System, Nbon Or Fax. B. The Date And Time Of Official Receipt Of The Bid Will Be The Time Of Receipt Recorded In The Nbon System (for E-bids) Or The Time Of Receipt In The Province's Electronic Mail System (for Fax And Email Bid Submissions). 6. All Bids Must Be Stated In Canadian Funds. Sales Taxes Should Not Be Included In The Unit, Extended Or Total Prices. 7. All Tenders Must Be F.o.b. Destination, Freight Prepaid. 8. This Invitation Is Being Conducted Under The Provisions Of The Procurement Act And Regulation 2014-93 As Of The Date Of The Issuance Of The Invitation. Direct Deposit The Province Of New Brunswick Is Now Using Direct Deposit As The Standard Method Of Issuing Payments. Suppliers Are Required To Provide Bank Account Information And An Email Address For The Notice Of Remittance. Please Send The Completed Direct Deposit Form To Service New Brunswick (e-mail Address And Mailing Address Are Indicated On The Form). Please Click On The Link Below To View The Direct Deposit Form. Https://www2.snb.ca/content/dam/snb/procurement/directdepositvirementdirect.pdf A Bidder Must Obtain Official Solicitation Documents From A Distribution Service, Authorized By The Minister Of Service New Brunswick, In Order To Submit A Bid. The Current Authorized Distribution Services Are The New Brunswick Opportunities Network (nbon) (operated By Service New Brunswick, Province Of Nb), Bidsalert (operated By Tendering Publications Ltd.) And Merx (operated By Mediagrif Interactive Technologies). Bids Should Be Submitted On The Official Bid Documents Obtained From These Authorized Distribution Services. The Province Of New Brunswick Reserves The Right To Negotiate Pricing, Value Added And Other Savings Opportunities With The Successful Proponent At Time Of Award And Throughout The Contract. All Suppliers Engaged To Deliver Services On Behalf Of The Government Of New Brunswick Must Ensure Compliance With The Official Languages Act In The Delivery Of Those Services. For More Information, Please Refer To The Official Languages Act. The Atlantic Provinces Standard Terms & Conditions For Goods And Services Apply To This Procurement And Are Considered To Be Incorporated Into This Document. By Submitting A Bid, You Agree And Accept These Terms And Conditions. Current "atlantic Provinces Standard Terms And Conditions" Are Available On The New Brunswick Opportunities Network, The Council Of Atlantic Premiers' Website Or From An Authorized Service Provider. Covid-19 Restrictions For Workers Entering New Brunswick All Suppliers And Workers Entering The Province Of New Brunswick For Work Purposes Must Comply With The Requirements Established By Worksafe Nb And Public Health, Including Isolation Requirements Where Applicable. Click Here For More Information On These Requirements. Questions: Written Questions Relating To This Opportunity May Be Submitted To The Address Provided Below Via Email By Clicking On Questions. Please Be Sure To Include The Solicitation/tender Number In The Subject Line. Email Address: Bidquestionssoumissions@snb.ca Note: This Email Account Is Strictly For The Receipt Of Questions On Open Opportunities. This Email Is Not For The Submission Of Bids. Covid-19 Supplier Vaccination Policy Suppliers Must Comply With All Gnb Health And Safety Policies And Standards Including, Without Limitation, All Health And Safety Policies And Standards Related To Covid-19, As Applicable. Go To Www.gnb.ca/nbon To View The Full Policy And Faqs. Under Canadian Law (and International Agreements), Your Bid Must Arrive Separately And Independently, Without Conspiracy, Collusion Or Fraud; See Http://www.competitionbureau.gc.ca/eic/site/cb-bc.nsf/eng/home For Further Information. Pay Equity Does Your Organization Have 50 Or More Employees? The Government Of New Brunswick Is Committed To Encouraging And Incentivizing The Adoption Of Pay Equity By Employers Doing Business With Government. Prior To The Award Of Procurements For Goods And Services Valued Over $1,000,000, Suppliers, With Fifty (50) Or More Employees Will Be Required To Complete The Pay Equity Learning Module Developed By The Women's Equality Branch. Suppliers Should Provide A Copy Of Their Certificate Of Completion With Their Bid Submission. To Complete The Online Module And Obtain Your Certificate, Please Visit Www.gnb.ca/payequity. For Questions, Please Contact The Pay Equity Bureau Toll Free: (877) 253-0266 Or By Email: Peb-bes@gnb.ca. All Discounts Quoted Will Be Considered To Be Without Limitations. Award Of Contracts: No Contract Shall Be Awarded And No Payment Shall Be Made To A Vendor Unless Authorized By The Minister Or His Delegates. The Minister May Make An Award To The Preferred Vendor Conditional On The Negotiation And Acceptance Of A Detailed Contract Between The Province And The Vendor. In Such Cases, Should The Detailed Contract Negotiations Not Be Completed In A Reasonable Period Of Time, The Province Reserves The Right To Discontinue Negotiations With The Vendor And Subsequently Enter Into Negotiations With The Second Preferred Vendor. No Right Or Duty, In Whole Or In Part, Of The Vendor Under A Contract Issued May Be Assigned Or Delegated Without The Prior Consent Of The Strategic Procurement Branch. Unless Indicated Otherwise In This Tender Notice Or Attached Documents, All Prices Must Be Extended And Totalled. All Suppliers Engaged To Deliver Goods Or Services To The Government Of New Brunswick Must Ensure Compliance With The Designated Materials Regulation In The Provision Or Delivery Of Those Goods Obligated Under That Regulation. Please Refer To Recycle Nb's Website And The Designated Materials Regulation For Specifics. Payment Of Invoices Payment Of Invoices Is The Responsibility Of The Department Or Organization To Whom The Goods Are Shipped Or Services Are Supplied. Where The Estimated Value Of The Goods Or Services To Be Procured Is Below The Lowest Applicable Threshold Value Of Any Relevant Trade Agreement, Service New Brunswick Reserves The Right To Give Preferential Treatment To A Prospective Supplier From New Brunswick. Should This Right Be Exercised, The Following Order Of Priority Will Apply: A) Firstly, New Brunswick Manufacturers If The Goods To Be Procured Are Manufactured In New Brunswick; And B) Secondly, New Brunswick Vendors. When Bid Submissions Are Evaluated On Price: - Applicability Of The Preferences Will Be Determined Based On The Price Differential Between The Lowest-priced Acceptable Bid And The Bid Receiving The Preferential Treatment. - The Price Differential Under Which A Nb Supplier Preference May Be Applied Will Be Limited To 10%. When The Lowest-priced Acceptable Bid Before Preferential Treatment Is Applied Is A New Brunswick Vendor, The Price Differential Under Which A Nb Manufacturer Preference Will Be Applied Will Be Limited To 5%. - The Preferential Treatment Will Be Applied By Making The Award To The Nb Supplier. When Bid Submissions Are Evaluated On A Point System: - Applicability Of The Preferences Will Be Determined Based On The Price Differential Between The Pricing Component Of The Highest Scoring Acceptable Bid Submission And The Pricing Component Of The Bid(s) Receiving The Preferential Treatment. - The Price Differential Under Which A Nb Supplier Preference May Be Applied Will Be Limited To 10%. When The Highest Scoring Acceptable Bid Submission Before Preferential Treatment Is Applied Is A New Brunswick Vendor, The Price Differential Under Which A Nb Manufacturer Preference Will Be Applied Will Be Limited To 5%. - The Preferential Treatment Will Be Applied By Allotting A Maximum Of An Additional 5% Of The Total Possible Points To New Brunswick Manufacturers' Total Scores And 4% To Nb Vendors' Total Scores. If No Bid From A New Brunswick Manufacturer Has Been Retained For Preferential Treatment, New Brunswick Vendors May Receive A Maximum Of An Additional 5% Of The Total Possible Points Rather Than 4%. The Decision To Apply A Preference Will Be At The Sole Discretion Of Service New Brunswick. To Be Eligible, Suppliers Must Meet The Definition Of Nb Supplier As Identified By The Regulation Under The Procurement Act. Nb Manufacturers Should Indicate In Their Bid That They Are A Nb Manufacturer To Be Considered For The Nb Manufacturer Preference. Holiday Season Office Closure The Strategic Procurement Division Of Service New Brunswick (located At 300 St. Mary's Street) Will Be Closed For The Holiday Season. This Includes All Strategic Procurement Operations (except Strategic Procurement - Health), The Reception Area And The Central Tendering Office. The Closure Period Is From 12 P.m. On December 24, 2024 To 8:15 A.m. On January 2, 2025. The New Brunswick Opportunities Network (nbon) Will Be Accessible Throughout This Period, However Please Note Support (helpline And Email Queries) Will Not Be Available During This Time.

DEPT OF THE NAVY USA Tender

Others
United States
Closing Date31 Jan 2025
Tender AmountRefer Documents 
Details: Contact Information|4|n711.6|baf/bak|717-605-2864|leigh.e.catchings.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving (combo)|na|tbd|n00104|tbd|tbd|see Schedule|see Schedule|na|na|tbd|na||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|334412 334418 334511 |750 1000 1250 |||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||| please Quote A Firm Fixed Price For The Procurement Of These Items. do Not Include The Cost For Shipping Material As The Government Implemented Shipping System Or Atac Will Be Shipping/delivering Material. please Verify: 1. If You Are In Compliance With Both Far Clauses 52.204-24 And 52.204-25 And Dfars Clauses 252.204-7008 And 252.204-7012. 2. Procurement Acquisition Lead Time (palt) nom: Circuit Card Assembly P/n: 1977455 Nsn: 7hh 5998 013220629, Qty: 33 nom: Display Unit P/n: 1979344 Nsn: 7hh 7025 013586244;qty. 2 nom: Video Control Unit P/n: 4302554 Nsn: 7hh 5840 015505120; Qty: 2 nom: Printed Circuit Board P/n: 4304105 Nsn: 7hh 5998 015771738 Qty. 12 all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, or Sent By Other Electronic Commerce Methods, Such Asemail. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein. the Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Circuit Card Assemb . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Circuit Card Assemb Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;03956 1977455; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 3.4 Marking - This Assembly And Its Piece Parts Shall Be Physically Identified In Accordance With Mil-std-130. 3.5 Interchangeability - Interchangeability Of Parts, Subassemblies, And Assemblies Shall Conform To The Following Criteria: Design Tolerances - Design Tolerances Shall Permit Parts, Subassemblies And Assemblies To Be Used In Their Parent Assemblies Without Regard To The Source Of Supply Or Manufacturer. Parts, Subassemblies And Assemblies Having The Full Range Of Dimensions and Characteristics Permitted By The Specification Governing The Part, Subassembly Or Assembly Shall Be Usable As Replacement Items Without Selection And Without Departure From The Specified Performance Guidelines Of The Parent Items. Parts And Materials - When Permission Is Granted To Use A Nonstandard Part Or Material Because The Exiting Standard Part Or Material Is Not Available, The Equipment Shall Be So Designed That The Nonstandard Part Or Material And The Standard Part Or material Are Interchangeable. When The Specification For The Part Or Material Contains Substitutability Or Supersession Information, The Design Shall Permit The Substitute Or Superceding Parts Or Materials To Be Used Interchangeably. 3.6 Workmanship - Workmanship For Electronic Equipment Shall Conform To The Following Criteria: Cleaning - After Fabrication, Parts And Assemblied Equipment Shall Be Cleaned Of Smudges, Loose, Spattered, Or Excess Solder, Weld Metal, Metal Chips And Mold Release Agents, Or Any Other Foreign Material Which Might Detract From The Intended Operation, function, Or Appearance Of The Equipment. Threaded Parts Or Devices - Screws, Nuts, And Bolts Shall Show No Cross Threading, Mutilation, Or Detrimental Or Hazardous Burrs, And Shall Be Firmly Secured. Bearing Assemblies - Bearing Assemblies Shall Be Free Of Rust, Discoloration, And Imperfections Of Ground, Honed, Or Lapped Surfaces. Conta Cting Surfaces Shall Be Free Of Tool Marks, Gauge Marks, Nicks, Or Other Surface-type Defects. There Shall Be No detrimental Interference, Binding, Or Galling. Wiring - Wires And Cables Shall Be Positioned Or Protected To Avoid Contact With Rough Or Irregular Surfaces And Sharp Edges And To Avoid Damage To Conductors Or Adjacent Parts. Shielding - Shielding On Wires And Cables Shall Be Secured In A Manner That Will Prevent It From Contacting Or Shorting Exposed Current-carrying Parts. The Ends Of The Shielding Or Braid Shall Be Secure To Prevent Fraying. Containment - The Harness And Cable Containment Means Shall Be Neat In Appearance And Uniformly Applied. The Containment Means (lacing, Ties, Tiedown Straps) Shall Not Cause The Wire Or Cable Insulation To Deform So That Performance Characteristics Are adversely Affected. Insulation - There Shall Be No Evidence Of Burns, Abrading, Or Pinch Marks In The Insulation That Could Cause Short Circuits Or Leakage. Clearance - The Clearance Between Wires Or Cables And Heat Generating Parts Shall Be Sufficient To Minimize Deterioration Of The Wires Or Cables. 3.7 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Display Unit . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Display Unit Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;03956 1979344; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Video Control Unit . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Video Control Unit Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;03956 4302554; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Printed Circuit Boa . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Printed Circuit Boa Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;03956 4304105; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material will Be Cause For Rejection. If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part. The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are located So As Not To Constitute A Contamination Hazard. If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The requirements Of This Contract Are Concerned. These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements. Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided: Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface ship Atmosphere. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION USA Tender

Others
Corrigendum : Closing Date Modified
United States
Closing Date15 Jan 2025
Tender AmountRefer Documents 
Details: The National Aeronautics And Space Administration (nasa) Langley Research Center (larc) Is In The Early Stages Of Developing A Mission Design, Project Implementation Plan, And Procurement Strategy That Could Potentially Lead To An Earth Aerocapture Technology Demonstration Mission. Nasa Larc Is Hereby Soliciting Information From Potential Sources With The Capabilities To Provide Spacecraft Systems And Mission Operations For The Mission. the Mission Would Demonstrate Aerocapture At Earth As A Precursor To Using The Technology For Future Planetary Science Missions. Aerocapture Technology Reduces The Required Capability And Mass Of A Spacecraft Propulsion System, Lowering The Launch Vehicle Payload Mass Or Enabling More Capacity For Science Instruments, And Is Particularly Beneficial For Missions To The Solar System's Ice Giant Planets [1]. The Demonstration Mission Is Intended To Focus On Key Objectives Necessary To Mature The Technological Readiness Of Aerocapture Including Vehicle Aerodynamics, Flight Dynamics, Guidance, Navigation And Control, And Mission Operations. Flight Data Will Be Acquired During The Demonstration And Used To Improve And Validate Tools To Design And Plan Future Missions. nasa Is Considering Two Concepts For The Mission, Both Of Which Use A Small Entry Capsule (referred To As The Aerocapture Flight System, Or Afs) To Execute The Aerocapture Maneuver. The Afs Is Comprised Of An Aeroshell, Reaction Control System, Other Ancillary Systems, And A Smallsat That Is Released Into Earth Orbit. The First Mission Concept Utilizes A Geostationary Transfer Orbit (gto) As An Initial State For The Afs, Which Is Deployed Into Gto From An Evolved Expendable Launch Vehicle (eelv) Secondary Payload Adapter (espa). In The Second Concept, The Afs Is Released On An Earth Intercept Trajectory From A Spacecraft Returning From A Lunar Mission. A Preliminary Concept Of Operations (conops) For A Gto-based Aerocapture Demonstration Is Illustrated In Figure 1 (attached). Details Shown Regarding Orbit Altitudes Are For Reference Only, And Will Continue To Be Resolved (tbr) In Upcoming Design Trades. referring To Figure 1, The Preliminary High-level Mission Conops And Sequence Of Events Is As Follows. The Sequence Of Events Is For Reference And Context Only To Support The Vendors' Responses To This Request For Information, And Will Continue To Be Updated As Nasa Larc Progresses Through The Early Stages Of Mission Design. the Afs, Attached To The Port Of An Espa Grande With A Separation Mechanism, Is Delivered And Released Into Gto By The Launch Vehicle. The Afs Continues In Gto While Using Its Reaction Control System To Maintain Attitude During Preparations For The Aerocapture Maneuver. Nasa's Intention Is For The Afs To Complete Less Than Two Full Orbits Before Beginning The Aerocapture Maneuver. near Gto Apogee, The Afs Reaction Control System Delivers The Delta-v Required To Divert The Capsule Along The Flight Path Necessary To Intercept The Earth's Atmosphere And Initialize The Aerocapture Maneuver. the Afs Reaction Control System Continually Adjusts The Capsule's Attitude, Utilizing The Vehicle's Aerodynamic Lift To Maintain Its Flight Path Inside A Pre-planned Corridor Through The Earth's Atmosphere With A Periapsis Of Approximately 65 Km (tbr). after Completing The Atmospheric Flight, The Afs Exits The Earth's Atmosphere In An Elliptical Orbit With An Apoapsis Of Approximately 500 Km (tbr). within 15 Minutes (tbr) After Exiting The Earth's Atmosphere, The Forward Heatshield Of The Afs Aeroshell Is Jettisoned And A Smallsat Is Released Into The New Elliptical Orbit. The Smallsat Utilizes Its Attitude Control System To Attain A Stable Attitude And Prepares For An Apogee Burn To Circularize The Orbit. when The Smallsat Reaches Apogee For The First Time, Its Propulsion System Delivers The Delta-v Necessary To Circularize The Orbit At An Altitude Of 500 Km (tbr). the Smallsat Continues In Its Circular Orbit Until The Flight Data Acquired Throughout The Demonstration Has Been Transmitted To Ground Stations. Successful Transmission Of The Flight Data Signifies The End Of The Demonstration, Subject To Any Spacecraft Disposal Operations Necessary In Accordance With Nasa Orbital Debris Requirements [2, 3]. the Salient Features And High-level Functional Requirements Of The Afs That Are Envisioned To Support The Mission’s Preliminary Concept Of Operations Are As Follows. Since Nasa Is In The Early Stages Of Mission And System Design, These Features And Requirements Are Subject To Change As The Design Matures. The Information Is Provided Herein As A Reference For Vendors To Consider When Evaluating The Mission Concept And Assessing The Capabilities That Vendors May Contribute To The Demonstration Mission In Response To This Request For Information. afs Mass And Volume: The Afs Shall Be A Blunt-body Capsule With A 60° (tbr) Sphere-cone Forebody Geometry. The Aeroshell Backshell Geometry Has Not Been Determined, But Must Provide The Volume To Accommodate The Smallsat, The Afs Reaction Control System, Wiring Harnesses, And Ancillary Systems Required To Perform The Mission. The Afs Shall Possess The Mass And Volume To Be Accommodated On A Single Port Of An Espa Grande [4]. afs Aeroshell: The Aeroshell Shall Be Comprised Of A Forebody Heatshield Structure And A Backshell Structure With Mechanical Provisions To Separate The Two Structures After Completion Of The Aerocapture Maneuver. The Backshell Structure Shall Accommodate A Separation Ring To Attach And Release The Afs From The Espa Grande Port. Either Structure Shall Incorporate The Mechanical Interface To Attach And Release The Smallsat After The Aeroshell Structures Are Separated. The Backshell Shall Incorporate External Mechanical Interfaces For Ground Support Equipment (gse) And Electrical Connections For Battery Charging And Functional Tests Prior To Launch. Devices To Sever Wiring Harnesses Between The Smallsat And Afs Systems Will Be Required, And Depending On The Smallsat's Telecommunications Configuration, An Antenna(s) Mounted To The Backshell Structure May Also Be Needed. aerodynamic Lift Provisions: The Afs Will Control Its Flight Path During The Aerocapture Maneuver By Modulating The Magnitude And/or Direction Of The Entry Capsule's Aerodynamic Lift Vector (e.g., Bank Angle Modulation). The Vehicle's Aerodynamic Lift Is Envisioned To Be Produced By The Capsule Flying At An Angle-of-attack Induced By Either A Center-of-gravity (cg) Offset Or An Asymmetric Aerodynamic Device Such As A Trim Tab. Nasa's Near-term Trade Studies Will Evaluate The Different Methods Of Producing Aerodynamic Lift Considering System Mass, Technological Readiness, Complexity, And Risk. thermal Protection Systems: The Aeroshell Forebody Heatshield And Backshell Shall Include Government-furnished Thermal Protection Systems (tps) To Protect The Afs From The Aerothermal Environments Produced During The Aerocapture Maneuver. The Tps Will Be Designed To Accommodate The Entry System Instrumentation (esi) Described Below And Other Ancillary Systems And Interfaces That Require Tps Penetrations For Installation And/or Operation. entry System Instrumentation: The Government Will Furnish Esi To Be Incorporated Into The Aeroshell Heatshield And Backshell. The Esi Will Be Comprised Of Thermocouples And Pressure Transducers, The Quantities And Locations Of Which Have Not Been Determined, To Measure The Afs Entry Environments During The Aerocapture Maneuver. A Flight Data System Residing On The Smallsat Shall Provide Power To The Esi And Record And Store The Esi Data That Will Be Transmitted To Ground Stations Near The Conclusion Of The Demonstration. afs Reaction Control System: The Afs Shall Incorporate A Reaction Control System With The Capability To Correct For Launch Vehicle Orbit Insertion Dispersions, Deliver The Delta-v To Divert The Afs Into The Intended Earth Atmosphere Interface Conditions For Aerocapture, And Maintain Afs Attitude As Required From Gto Insertion Through The Aerocapture Maneuver To The Point When The Aeroshell Separates And The Smallsat Is Released. afs Smallsat: The Preliminary Demonstration Mission Concept Of Operations Requires The Afs Smallsat To Be Operational For The Full Duration Of The Technology Demonstration Timeline. The Smallsat Shall Provide Power, Avionics And Flight Instrumentation Including An Inertial Measurement Unit (imu), Command And Data Handling (c&dh), Attitude Determination And Control, And Communications For All Mission Phases From Gto Insertion To Data Download And Orbital Debris Mitigation (as Required). The Smallsat Is Required To Interface With External Systems, Such As The Afs Reaction Control System And Esi, To Support The Mission Through The Aerocapture Maneuver, And Then Operate In A Stand-alone Configuration After Being Released From The Aeroshell. to Aid In Continuing The Formulation Of A Mission Design And Developing A Procurement Strategy To Implement The Mission, Nasa Larc Is Conducting Market Research Seeking Sources With Demonstrated Experience To Provide The Following Capabilities To Support The Demonstration Mission. design And Delivery Of The Afs: Design, Fabricate, Integrate, And Test The Afs Including The Aeroshell, Reaction Control System, Smallsat, Separation Systems, And Government-furnished Tps And Esi. Deliver The Afs To The Launch Provider And Support Assembly, Test, And Launch Operations (atlo). mission Design And Navigation: Design Of The Orbital Mechanics And Navigation From The Point The Afs Is Released Into Gto To End-of-mission. Mission Design Will Be Supplemented By Government-furnished Guidance, Navigation And Control (gnc) Software To Control The Afs During The Aerocapture Maneuver. Capabilities Shall Include Experience With Mission Design And Navigation For High-energy Earth Orbits And Missions Returning From Lunar Environs. mission Operations: Establish A Ground Operating System And Conduct Mission Operations For All Phases Of The Demonstration From Launch To Mission Termination. nasa Larc Is Seeking Capability Statements From All Interested Parties, Including All Socioeconomic Categories Of Small Businesses And Historically Black Colleges And Universities (hbcu)/minority Institutions (mi), And Members Of The Underserved Communities As Defined By Executive Order 13985, Advancing Racial Equity And Support For Underserved Communities Through The Federal Government, For The Purposes Of Determining The Appropriate Level Of Competition And/or Small Business Subcontracting Goals For The Earth Aerocapture Technology Demonstration Mission. The Government Reserves The Right To Consider A Small, 8(a), Women-owned (wosb), Service Disabled Veteran (sd-vosb), Economically Disadvantaged Women-owned Small Business (edwosb) Or Hubzone Business Set-aside Based On Responses Received. no Solicitation Exists; Therefore, Do Not Request A Copy Of The Solicitation. If A Solicitation Is Released, It Will Be Synopsized On Sam.gov. Interested Firms Are Responsible For Monitoring This Website For The Release Of Any Solicitation Or Synopsis. interested Firms Possessing One Or More Of The Capabilities Described Above Should Submit A Capability Statement Of No More Than 20 Pages(excluding Cover Page And Table Of Contents) Indicating The Ability To Perform These Aspects Of The Demonstration Mission. Please Include The Following Elements In The Capability Statement. mission Conops Assessment: The Preliminary Mission Conops Described Herein Was Formulated To Advance The Technology Readiness Level (trl) Of Aerocapture And Enable Its Infusion Into Future Planetary Missions. The Conops Includes Multiple Events Requiring Mechanical Separations And Severing Of Wiring Harnesses, And Relies On A Smallsat Capable Of Controlling A Flight System In Two Different Configurations (afs And Stand-alone Smallsat). Provide An Assessment Of The Preliminary Conops Identifying Design Drivers And Risks Relative To Existing State-of-the-art Systems And Your Capabilities And Experience. Please Include An Evaluation Of The Potential Mass And Volume Of The Afs Relative To The Espa Grande Accommodation Requirements. Suggest Changes In The Conops Or The Afs Configuration That Would Substantially Reduce Risk And Cost Without Significantly Compromising The Demonstration Objectives. describe Your Organization's Capability And Experience To Provide A Smallsat Spacecraft And Flight Software That Meets The Mission Requirements. Due To The Anticipated Fast-paced Implementation Of The Mission, Smallsats That Are Nearly "off-the-shelf" Are Considered To Be Advantageous To Mission Success. Include Information On The Smallsat Form Factor, Mass, Accommodation Requirements, And Operational Heritage. Describe The Smallsat Capability To Interface And Manage External Systems Such As The Afs Reaction Control System, And Explain How The Smallsat Would Accommodate The Changes In The Flight System Configuration That Occur During The Mission. describe Your Organization's Capability And Experience To Design And Provide The Afs Aeroshell. Provide Examples Of Aeroshells Of Similar Scale And Mass Utilized For Earth Atmospheric Entry In Previous Missions. Describe The Basic Aeroshell Structural Architecture And Any Unique Features Required By The Mission That Introduce Substantial Risk And Cost. Discuss The Provisions Necessary To Implement The Three Separation Events Required For The Mission Conops: 1) Separation Of The Afs From The Espa Grande, 2) Separation Of The Afs Forebody Heatshield, And 3) Separation Of The Smallsat From The Aeroshell. describe Your Organization's Capability And Experience To Plan And Conduct The Afs Integration And Testing. Include A Description Of Facilities, Ground Support Equipment, And Capabilities For Afs Environmental Testing. Include A Description Of Previous Experience Integrating Thermal Protection Systems Onto Blunt-body Aeroshells And The Installation Of Thermocouple And Pressure Transducer Instrumentation. describe Your Organization's Capability And Experience To Design Missions And Navigation Strategies For Spacecraft In High-energy Earth Orbits Or Returning From The Moon. Include Information On Analysis Tools And Methods And Highlight Any Previous Missions With A Concept Of Operations Similar To The Aerocapture Demonstration Mission. describe Your Organization's Capability To Establish A Ground Operating System And Conduct Mission Operations. Include Information On Existing Infrastructure That Would Be Leveraged For The Mission Including Telecommunications Ground Stations, Mission Operating Centers, And Ancillary Hardware And Software. describe Your Plans For Partnering With Other Organizations To Provide Any Of The Aforementioned Capabilities For The Mission. all Responses Shall Be Submitted Electronically Via Nasa’s Enterprise File Sharing And Sync Box (efss Box), Fedramp Moderate Certified Platform, No Later Than January 15, 2025. Electronic Submissions Shall Not Contain Hidden Formulas, Tables, Be Locked, Be Password Protected, Or Contain Links To Data Not Included In The Electronic Copy. Please Reference The Synopsis Number And “earth Aerocapture Demonstration Rfi” In Any Response. All Responses Shall Be Submitted To: Https://nasagov.app.box.com/f/7cf6c2fec43e4f7b8d1dff31208c6be9. If You Have Any Trouble Submitting Your Response Via Efss Box, Please Contact Stacy Hollis At Stacy.m.hollis@nasa.gov. this Synopsis Is For Information And Planning Purposes Only And Is Not To Be Construed As A Commitment By The Government Nor Will The Government Pay For Information Solicited. Respondents Will Not Be Notified Of The Results Of The Evaluation. references: [1] "uranus Flagship-class Orbiter And Probe Using Aerocapture," Aiaa 2024-0714, Aiaa Scitech Forum, Orlando, Florida, January 2024. [2] "process For Limiting Orbital Debris," Nasa-std-8719.14c , November 5, 2021. [3] "orbital Debris Mitigation," Nasa-npr-8715.6e, April 18, 2024. [4] "espa User's Guide, The Eelv Secondary Payload Adapter," Moog, Incorporated.

Department Of Agriculture Tender

Electrical Goods and Equipments...+1Electrical and Electronics
Corrigendum : Closing Date Modified
Philippines
Closing Date21 Jan 2025
Tender AmountPHP 7.2 Million (USD 122.9 K)
Details: Description Invitation To Bid For The Procurement Of 2 Units Recirculating Dryer (6 Tonner) Under Corn Program Fy 2025 1. The Department Of Agriculture Regional Field Office Iva Through The Corn Program Intends To Apply The Sum Of Seven Million Two Hundred Thousand Pesos (ᵽ 7,200,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Procurement Of 2 Units Recirculating Dryer (6 Tonner) Under Corn Program Fy 2025 With Project Identification No.: Itb-2025-12-061. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture Regional Field Office Iva Now Invites Bids For The Above Procurement Project. 2 Units Recirculating Dryer (6 Tonner) I. Design And Performance Type: Batch Type, Recirculating, Stationary Capacity: 4 To 6 Mt Drying Rate: 2% Per Hour, Minimum (batch Type) Drying Efficiency: Minimum, 75% Moisture Gradient: Maximum, 2% Drying Loss/spillage: 1% Maximum Product Quality: A. Cracked Grain, % Increase: 10%, Maximum B. Broken/split Kernels, % Increase: 7%, Maximum C. Hulled/damaged Grain, % Increase, 2% Maximum With Programmable In-line Monitoring System For Moisture Content, Temperature And Can Control Heating System And Shutdown The Drying Operation When The Grain Is Already Dried. Material Of Construction: Parts Of The Dryer With Direct Contact With The Grains Shall Be Made By Non-corrosive And Food Grade Material Eg. Stainless Steel 304. Power Requirement: Single-phase Electrical Connection, Maximum 5 Kw Rated Power Of All Electric Motors Ii. Heating System Requirement 1. Heating System 1 (petroleum Based Fuel) Petroleum Based Fuel: Direct-fired Heating System Efficiency: 90%, Minimum With The Following Components And Accessories: - Flame Sensor - Electronic Ignition System - Automatic Fuel Shut-off - Adjustable Fuel Vaporizer - Automatic Temperature Control - Elevated Non-corrosive And Heat Resistant Fuel Container At Least 200 Liters Capacity - Compatible Single-phase Electric Motor For The Heating System 2. Heating System 2 (biomass Fuel) Biomass Fuel: Indirect-fired Heating System Efficiency: 50%, Minimum With The Following Components And Accessories: - Heat Exchanger: Stainless (ss 201/ss 304, 1.2mm, Minimum) / Fire Tubes (5mm Seamless, Minimum) - Burning Chamber: Made Of Refractory Bricks - Automatic Fuel Feeder: Auger Type - Temperature Control - Compatible Electric Motor For The Heating System Iii. Other Dryer Components And Accessories 1. Pre-cleaner Input Capacity: 4-6 Ton/hr, Minimum Sieve Mechanism: All Parts That Come In Contact With Grain Must Be Made By Non-corrosive And Food Grade Material Eg. Stainless Steel 304. Capable Of Removing Large Impurities And Unthreshed Paddy With Compatible Electric Motor" 2. Provision Of Ducting To Divert Heat Source From Heating System 1 Or Heating System 2, Made Of Stainless Steel Or Primer Painted And Powder Coated B.i. Or G.i. Sheet. Insulator Material For The Ducting Shall Be Made Of Ceramic Blanket. 3. Dust Collection System Consists Of Cyclone Separator / Collector And Suction Blower. All Ducting Shall Be Fabricated From Sheet Metal And The Connectors Must Be Airtight. 4. Generator Set Rated Power/kva: Minimum 15 Kva Voltage Requirement Compatible To The System Power Supply / Generating System Should Be Brand New And Not Refurbished. At Least Three (3) Years From The Date Of Manufacture To The Date Of Opening Of Bids And With Engrave Serial Number. Provided With Mechanical Transfer Switch (mts) The Electrical Wire, Wire Accessories And Piping To Connect The Power Generating Unit To The Mts And The Dryer Control Panel / System Shall Be Provided By The Bidder With Thermal Insulation And Noise Suppressor. Noise Level: 92db Maximum, If Exceeded, Earmuffs Shall Be Provided For Each Unit. With Protection Or Covering Against Rat Entry (as Per Manufacturer’s Specification) 5. Portable Handheld Moisture Meter Grain: Applicable To Corn Kernel, Paddy/rough Rice And Milled Rice Type: Capacitance Moisture Range: 12-15% Or Wider Accuracy: ±0.5% Or Better Lcd/led Display Battery Operated With Product Brochure Written In English 6. Standard Heavy-duty Tools, Made Of Tempered Steel And Chrome Vanadium Shall Include But Not Limited To The Following: - One Set Socket Wrench (no. 8, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 22, 23, 24, 27, 30, 32, Minimum) - One Set Combination Wrench (open And Box, 10pcs - Size Appropriate To The Drying System) - Electrical Plier: 200mm, Minimum - Screw Driver,: Philips And Flat Head, 300mm Minimum - Grease Gun: 250mm Cylinder Length, Minimum - Mechanical Pliers: 200mm, Minimum - Heavy Duty Toolbox And Roll Up Tools Holder (can Accommodate All Tools) 7. Air Compressor For Cleaning, Heavy Duty, At Least 120 Psi, 5m Air Hose 8. One (1) Unit Fire Extinguisher, Dry Chemical, Stored Pressure Type, 6 Kg Minimum 9. Provision Of Disposal Cart For The Ashes 10. With Portable, Heavy-duty Weighing Scale, Minimum 150 Kg Weighing Capacity 11. With Collapsible Cover (trapal), Thickness: S200 12. With Bagging Bin With Minimum Capacity Appropriate To The System 13. Non-stainless Material Of The Dryer Shall Be Painted Finish With Rust-proofing Primer And Final Paint Color. Iv. Other Requirements 1. Certification That The Bidder Will Submit A Duly Signed Electrical Plan Of The Drying System Offered (electrical Layout, Schedule Of Loads, General Notes And Specification, And Legends/symbols) By A Registered Professional Engineer As A Condition For Payment 2. Copy Of Equipment Manufacturer Manual Of Drying Unit, Biomass Furnace, Generator Set And Portable Handheld Moisture Meter Written In English/filipino/vernacular To Be Presented During Post-qualification Evaluation 3. Copy Of The Brochures For The Drying Unit, Generator Set, Weighing Scale, Portable Handheld Moisture Meter And Air Compressor Are To Be Presented During The Post-qualification Evaluation. 4. With Laminated Reflectorized Vinyl Sticker "da-calabarzon" Logo (254 Mm X 254mm) For The Prescribed Part Of The Dryer And Generator Set, Sticker Specifications: 140 Gsm And Thickness Of 175 Microns, Minimum 5. Manufacturer's Nameplate (engraved In A Metal Sheet) With The Serial Number Of The Machine And Serial Number Of The Power Generating Unit 6. With Valid Amtec Test Result That Conforms To The Pns-paes 201:2015-agricultural Machinery-heated-air Mechanical Dryer-specifications. Separate Amtec Test Report For Both Heating Systems Should Be Provided. 7. Conduct Of Acceptance Testing Of All Units After Complete Installation Is Required Prior To Acceptance And 100% Payment Of The Winning Bidder. 8. Certification From The Bidder That They Shall Provide All Fuel, Raw Materials (corn Kernels) And Technician/operator Needed During Acceptance Testing. 9. Certification From The Bidder That The Offered Unit Is Brand New, Latest Model And Not Rebranded 10. Conformity As To The Technical Specifications Of The Procuring Entity Signed And Sealed By An Agricultural And Biosystems Engineer As Prescribed By The Section 27.1 Of The Ra 10915 11. With National Agricultural And Fisheries Machinery Assemblers, Manufacturers, Importers, Distributors And Dealers Accreditation And Classification (namdac) Certificate Of Accreditation 12. With Permit To Operate And Certificate Of Conformity Issued By Da-bafe As Per Memorandum Circular No. 30 Series Of 2020 13. Provision Of After Sales Services: •with One Year Warranty For Major Parts And Service From The Date Of Acceptance Of The Beneficiary •valid Certificate Of Dealership / Distributorship / Authority To Sell And Commitment To Supply Directly Issued By The Dryer Manufacturer Or Distributor To The Bidder •certification From The Supplier That They Will Repair Or Replace The Defective Parts Or Components And Provide After-sales Service Within 72 Hours (3 Days) Upon Receipt Of Complaints (pns/bafs/paes 192:2024) •certification That The Bidder Will Provide Training On The Proper Handling, Operation And Maintenance Of The Dryer And Generator Set For At Least Two (2) Operators Per Beneficiary. 14. Notarized Certificate Of Stock Availability Or Stock Allocation From The National Distributor Or Manufacturer Specifying The Name Of The Project 15. Certification Of Guaranteed Spare Parts Availability For At Least Five (5) Years 16. With Certification Of Very Satisfactory Performance Of The Supplier From At Least Three (3) Clients, With Full Address And Telephone Numbers, Within The Last Two (2) Years. V. Terms Of Payment 85 % Upon Complete Installation And 15% Upon Testing/commissioning And Acceptance Of Recipient Vi. Contract Duration And Delivery Place: Days To Complete Supply, Delivery, Installation And Testing: 60 Calendar Days Delivery Place: Batangas And Quezon Delivery Of The Goods Is Required Within Sixty (60) Calendar Days Upon Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Department Of Agriculture Regional Field Office Iva, 8:00 Am To 3:00 Pm Mondays Thru Fridays Except On The Scheduled Time Of Pre-bid Conference And Inspect The Bidding Documents At The Address Given Below: Department Of Agriculture Regional Field Office Iv-a Bac Secretariat Office / Arturo R. Tanco Training Hall Lipa Agricultural Research And Experiment Station (lares), Brgy. Marawoy, Lipa City, Batangas 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On The Address Given Above Mondays Thru Fridays 8:00 Am To 3:00 Pm Except On The Scheduled Time Of Pre-bid And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Ten Thousand Pesos (ᵽ10,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, Or Through Electronic Means. 6. The Department Of Agriculture Regional Field Office Iva Will Hold A Pre-bid Conference On December 26, 2024 01:10 Pm (bidders Must Be Present At The Venue One (1) Hour Before The Scheduled Bidding Activity. Time Schedule Is Subject To Adjustment Depending On The Flow Of Bidding Activity. Furthermore, Bidders Are Required To Provide Their Company Id And Another Valid Id, And Authorization Letter From The Company They Represent.) At Department Of Agriculture Regional Field Office Iv-a Stiarc Conference Room, Lipa Agricultural Research And Experiment Station (lares), Brgy. Marawoy, Lipa City, Batangas Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, Department Of Agriculture Regional Field Office Iv-a Stiarc Conference Room, Lipa Agricultural Research And Experiment Station (lares), Brgy. Marawoy, Lipa City, Batangas On Or Before January 7, 2025 9:00 Am. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 7, 2025 01:10 Pm (bidders Must Be Present At The Venue One (1) Hour Before The Scheduled Bidding Activity. Time Schedule Is Subject To Adjustment Depending On The Flow Of Bidding Activity) At Department Of Agriculture Regional Field Office Iv-a Stiarc Conference Room, Lipa Agricultural Research And Experiment Station (lares), Brgy. Marawoy, Lipa City, Batangas. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Department Of Agriculture Regional Field Office Iv-a Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation 11. The Department Of Agriculture Regional Field Office Iva Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Engr. Ernie N. Rabusa Chairperson, Bids And Awards Committee Secretariat Department Of Agriculture Regional Field Office Iv-a Lipa Agricultural Research And Experiment Station (lares), Brgy. Marawoy, Lipa City, Batangas Contact No.: (02) 8273-24-74 (local 4487) Email Address: Bacsecretariat@calabarzon.da.gov.ph 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: [https://notices.philgeps.gov.ph; Https://calabarzon.da.gov.ph/invitation-to-bid-page/] Date Of Issue: December 17, 2024 ______________________________________ (sgd) Engr. Romelo F. Reyes Chairperson, Bids And Awards Committee

Department Of Agriculture Tender

Electrical Goods and Equipments...+2Electrical and Electronics, Solar Installation and Products
Corrigendum : Closing Date Modified
Philippines
Closing Date21 Jan 2025
Tender AmountPHP 14.4 Million (USD 245.8 K)
Details: Description Invitation To Bid For The Procurement Of 4 Units Recirculating Dryer Under Rice Program Fy 2025 1. The Department Of Agriculture Regional Field Office Iva Through The Rice Program Intends To Apply The Sum Of Fourteen Million Four Hundred Thousand Pesos (ᵽ 14,400,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Procurement Of 4 Units Recirculating Dryer Under Rice Program Fy 2025 With Project Identification No.: Itb-2025-12-057. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture Regional Field Office Iva Now Invites Bids For The Above Procurement Project. 4 Units Recirculating Dryer I. Design And Performance Type: Batch Type, Recirculating, Stationary Drying Rate: 0.8% Per Hour, Minimum (batch Type) Drying Efficiency: Minimum, 75% Moisture Gradient: Maximum, 2% Drying Loss/spillage: 1% Maximum Product Quality: A. Cracked Grain, % Increase: 3% Maximum B. Head Rice, % Decrease: 5% Maximum C. Hulled/damaged Grain, % Increase: 2% Maximum With Programmable In-line Monitoring System For Moisture Content, Temperature And Can Control Heating System And Shutdown The Drying Operation When The Grain Is Already Dried. Material Of Construction: Parts Of The Dryer With Direct Contact With The Grains Shall Be Made By Non-corrosive And Food Grade Material Eg. Stainless Steel 304. Power Requirement: Single-phase Electrical Connection, Maximum Of 5kw Rated Power Of All Electric Motors Provision Of Built-in Automatic Moisture Meter Ii. Heating System Requirement 1. Heating System 1 (petroleum Based Fuel) Petroleum Based Fuel: Direct-fired Heating System Efficiency: 90%, Minimum With The Following Components And Accessories: - Flame Sensor - Electronic Ignition System - Automatic Fuel Shut-off - Adjustable Fuel Vaporizer - Automatic Temperature Control - Elevated Non-corrosive And Heat-resistant Fuel Container At Least 200 Liters Capacity - Compatible Single-phase Electric Motor For The Heating System 2. Heating System 2 (biomass Fuel) Biomass Fuel: Indirect-fired Heating System Efficiency: 50%, Minimum With The Following Components And Accessories: - Heat Exchanger: Stainless (ss 201/ss 304, 1.2mm, Minimum) / Fire Tubes (5mm Seamless, Minimum) - Burning Chamber: Made Of Refractory Bricks - Automatic Fuel Feeder: Auger Type - Temperature Control - Compatible Electric Motor For The Heating System Iii. Other Dryer Components And Accessories 1. Pre-cleaner Input Capacity: 4-6 Ton/hr, Minimum Sieve Mechanism: All Parts That Come In Contact With Grain Must Be Made Of Non-corrosive And Food Grade Material Eg., Stainless Steel 304 Capable Of Removing Large Impurities And Unthreshed Paddy With Compatible Electric Motor" 2. Provision Of Ducting To Divert Heat Source From Heating System 1 Or Heating System 2, Made Of Stainless Steel Or Primer Painted And Powder Coated B.i. Or G.i. Sheet. Insulator Material For The Ducting Shall Be Made If Ceramic Blanket. 3. Dust Collection System Consists Of Cyclone Separator / Collector And Suction Blower. All Ducting Shall Be Fabricated From Sheet Metal And The Connectors Must Be Airtight. 4. Generator Set Rated Power/kva: Minimum 15 Kva Voltage Requirement Compatible To The System Power Supply / Generating System Should Be Brand New And Not Refurbished. At Least Three (3) Years From The Date Of Manufacture To The Date Of Opening Of Bids And With Engrave Serial Number. Provided With Mechanical Transfer Switch (mts) The Electrical Wire, Wire Accessories And Piping To Connect The Power Generating Unit To The Mts And The Dryer Control Panel / System Shall Be Provided By The Bidder With Thermal Insulation And Noise Suppressor. Noise Level: 92db Maximum, If Exceeded, Earmuffs Shall Be Provided For Each Unit. With Protection Or Covering Against Rat Entry (as Per Manufacturer’s Specification) 5. Portable Handheld Moisture Meter Grain: Applicable To Paddy/rough Rice And Milled Rice Type: Capacitance Moisture Range: 12-15% Or Wider Accuracy: ±0.5% Or Better Lcd/led Display Battery Operated With Product Brochure Written In English 6. Standard Heavy-duty Tools, Made Of Tempered Steel And Chrome Vanadium Which Shall Include But Not Limited To The Following: - One Set Socket Wrench (no. 8, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 22, 23, 24, 27, 30, 32, Minimum) - One Set Combination Wrench (open And Box, 10pcs - Size Appropriate To The Drying System) - Electrical Plier: 200mm, Minimum - Screw Driver,: Philips And Flat Head, 300mm Minimum - Grease Gun: 250mm Cylinder Length, Minimum - Mechanical Pliers: 200mm, Minimum - Heavy Duty Toolbox And Roll Up Tools Holder (can Accommodate All Tools) 7. Air Compressor For Cleaning, Heavy Duty, At Least 120 Psi, 5m Air Hose 8. One (1) Unit Fire Extinguisher, Dry Chemical, Stored Pressure Type, 6 Kg Minimum 9. Provision Of Disposal Cart For The Ashes 10. With Portable, Heavy-duty Weighing Scale, Minimum 150 Kg Weighing Capacity 11. With Collapsible Cover (trapal), Thickness: S200 12. With Bagging Bin With Minimum Capacity Appropriate To The System 13. Non-stainless Material Of The Dryer Shall Be Painted Finish With Rust-proofing Primer And Final Paint Color. Iv. Other Requirements 1. Certification That The Bidder Will Submit A Duly Signed Electrical Plan Of The Drying System Offered (electrical Layout, Schedule Of Loads, General Notes And Specification, And Legends/symbols) By A Registered Professional Engineer As A Condition For Payment 2. Copy Of Equipment Manufacturer Manual Of Drying Unit, Biomass Furnace, Generator Set And Portable Handheld Moisture Meter Written In English/filipino/vernacular To Be Presented During Post-qualification Evaluation 3. Copy Of The Brochures For The Drying Unit, Generator Set, Weighing Scale, Portable Handheld Moisture Meter And Air Compressor Are To Be Presented During The Post-qualification Evaluation. 4. With Laminated Reflectorized Vinyl Sticker "da-calabarzon" Logo (254 Mm X 254mm) For The Prescribed Part Of The Dryer And Generator Set, Sticker Specifications: 140 Gsm And Thickness Of 175 Microns, Minimum 5. Manufacturer's Nameplate (engraved In A Metal Sheet) With The Serial Number Of The Machine And Serial Number Of The Power Generating Unit 6. With Valid Amtec Test Result That Conforms To The Pns-paes 201:2015-agricultural Machinery-heated-air Mechanical Dryer-specifications. Separate Amtec Test Report For Both Heating Systems Should Be Provided. 7. Conduct Of Acceptance Testing Of All Units After Complete Installation Is Required Prior To Acceptance And 100% Payment Of The Winning Bidder. 8. Certification From The Bidder That They Shall Provide All Fuel, Raw Materials (palay) And Technician/operator Needed During Acceptance Testing. 9. Certification From The Bidder That The Offered Unit Is Brand New, Latest Model And Not Rebranded 10. Conformity As To The Technical Specifications Of The Procuring Entity Signed And Sealed By An Agricultural And Biosystems Engineer As Prescribed By The Section 27.1 Of The Ra 10915 11. With National Agricultural And Fisheries Machinery Assemblers, Manufacturers, Importers, Distributors And Dealers Accreditation And Classification (namdac) Certificate Of Accreditation 12. With Permit To Operate And Certificate Of Conformity Issued By Da-bafe As Per Memorandum Circular No. 30 Series Of 2020 13. Provision Of After Sales Services: •with One Year Warranty For Major Parts And Service From The Date Of Acceptance Of The Beneficiary •valid Certificate Of Dealership / Distributorship / Authority To Sell And Commitment To Supply Directly Issued By The Dryer Manufacturer Or Distributor To The Bidder •certification From The Supplier That They Will Repair Or Replace The Defective Parts Or Components And Provide After-sales Service Within 72 Hours (3 Days) Upon Receipt Of Complaints (pns/bafs/paes 192:2024) •certification That The Bidder Will Provide Training On The Proper Handling, Operation And Maintenance Of The Dryer And Generator Set For At Least Two (2) Operators Per Beneficiary. 14. Notarized Certificate Of Stock Availability Or Stock Allocation From The National Distributor Or Manufacturer Specifying The Name Of The Project 15. Certification Of Guaranteed Spare Parts Availability For At Least Five (5) Years 16. With Certification Of Very Satisfactory Performance Of The Supplier From At Least Three (3) Clients, With Full Address And Telephone Numbers, Within The Last Two (2) Years. V. Terms Of Payment 85 % Upon Complete Installation And 15% Upon Testing/commissioning And Acceptance Of Recipient Vi. Contract Duration And Delivery Place: Days To Complete Supply, Delivery, Installation And Testing: 120 Calendar Days Delivery Place: Laguna, Rizal And Quezon Delivery Of The Goods Is Required Of 120 Calendar Days Upon Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). I. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. Ii. Prospective Bidders May Obtain Further Information From Department Of Agriculture Regional Field Office Iva, 8:00 Am To 3:00 Pm Mondays Thru Fridays Except On The Scheduled Time Of Pre-bid Conference And Inspect The Bidding Documents At The Address Given Below: Department Of Agriculture Regional Field Office Iv-a Bac Secretariat Office / Arturo R. Tanco Training Hall Lipa Agricultural Research And Experiment Station (lares), Brgy. Marawoy, Lipa City, Batangas Iii. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On The Address Given Above Mondays Thru Fridays 8:00 Am To 3:00 Pm Except On The Scheduled Time Of Pre-bid And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Twenty-five Thousand Pesos (ᵽ 25,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, Or Through Electronic Means. 6. The Department Of Agriculture Regional Field Office Iva Will Hold A Pre-bid Conference On December 26, 2024 10:40 Am (bidders Must Be Present At The Venue One (1) Hour Before The Scheduled Bidding Activity. Time Schedule Is Subject To Adjustment Depending On The Flow Of Bidding Activity. Furthermore, Bidders Are Required To Provide Their Company Id And Another Valid Id, And Authorization Letter From The Company They Represent.) At Department Of Agriculture Regional Field Office Iv-a Stiarc Conference Room, Lipa Agricultural Research And Experiment Station (lares), Brgy. Marawoy, Lipa City, Batangas Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, Department Of Agriculture Regional Field Office Iv-a Stiarc Conference Room, Lipa Agricultural Research And Experiment Station (lares), Brgy. Marawoy, Lipa City, Batangas On Or Before January 7, 2025, 9:00 Am. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 7, 2025, 10:40 Am (bidders Must Be Present At The Venue One (1) Hour Before The Scheduled Bidding Activity. Time Schedule Is Subject To Adjustment Depending On The Flow Of Bidding Activity. Furthermore, Bidders Are Required To Provide Their Company Id And Another Valid Id, And Authorization Letter From The Company They Represent.) At Department Of Agriculture Regional Field Office Iv-a Stiarc Conference Room, Lipa Agricultural Research And Experiment Station (lares), Brgy. Marawoy, Lipa City, Batangas. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Department Of Agriculture Regional Field Office Iv-a Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation 11. The Department Of Agriculture Regional Field Office Iva Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Engr. Ernie N. Rabusa Chairperson, Bids And Awards Committee Secretariat Department Of Agriculture Regional Field Office Iv-a Lipa Agricultural Research And Experiment Station (lares), Brgy. Marawoy, Lipa City, Batangas Contact No.: (02) 8273-24-74 (local 4487) Email Address: Bacsecretariat@calabarzon.da.gov.ph 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: [https://notices.philgeps.gov.ph; Https://calabarzon.da.gov.ph/invitation-to-bid-page/] Date Of Issue: December 17, 2024 _____________________________________ (sgd) Engr. Romelo F. Reyes Chairperson, Bids And Awards Committee

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Works
Electrical Works...+1Electrical and Electronics
Eprocure
India
Closing Date2 Jan 2025
Tender AmountRefer Documents 
Details: Works Contract for the execution of 1)Improvement estimate for replacement of deteriorated 6no 8mtr PSC pole at loc FI/19, 20&49 and FII/2,4&5 in Simon Nagar SS II 250 KVA under Asaripallam Section.2)Improvement estimate for replacement of deteriorated 5no 8mtr PSC pole at various locations under Asaripallam Section. 3)Eos to 1no LTCT SC to The Principal Commissioner of Income Tax at Door No.329 in Guest House SS I 500 KVA and proposed 1no 250 KVA DT under Asaripallam Section. 4)Eos to 1no TYSY to Tmy.Ramani Kannan under Asaripallam Section. 5)Improvement estimate for replacement of 6nos damaged 8mts PSC pole at loc.FI/10 in TKM SS V & FII/1 in TKM SS VIII, FI/10 in Pambanvilai SS I, FII/12 in Thoppoor SS II, FII/12,13 in Ottayalkudy under Asaripallam Section. 6)Improvement estimate for replacement of 7nos damaged 8mts PSC pole at loc.FI/8,9 in Thoppoor SS IV, FII/14,15 in Vembanoor SS VII, FI/13 in Paruthivilai Channelkarai SS under Asaripallam Section.7)Improvement estimate for replacement of deteriorated 4no 9mtr PSC pole at loc. FII/2 in Thammathukonam SS IV & FI/9 in Asaripallam SS I, FI/7 in Charlespuram SS I, FI/2 in Vembanoor SS IV under Asaripallam Section. 8)Improvement estimate for replacement of deteriorated 6no 8mtr PSc in various locations under Asaripallam section.9)Improvement estimate for strengthening of conddctor from ACSR 7/2.11 to AAAC 7/2.50 at Keezhaperuvilai SS 250KVA under Parvathipuram Section. 10)Improvement estimate for replacement of aged conductor from ACSR 7/2.11 to AAAC 7/2.50 at Kottavilai SS 250 KVA under Parvathipuram Section. 11)Estimate proposed for 1no 63KVA DT to avoid overloading of North Kannakurichi SS 100 KVA in KV Kallukatti Feeder under Rajakamangalam Section. 12)Estimate for proposed 1nos Erumbukadu SS 25KVA DT under Rajakamangalam Section. 13)Estimate for proposed 2nos 25KVA DT to avoid overloading of Sreekrishnapuram SS II 100 KVA in Kallukatti Feeder under Rajakamangalam Section. 14)Eos to 11No Additional Street light SC no:R6-952 of The President, Village Panchayat, Melasankarankuzhi in Pambanvilai under Asaripallam Section. 15)Eos to 13Nos new street light SC to The President, Village Panchayat, Melasankarankuzhi in Pambanvilai under Asaripallam Section. 16)Eos to 13Nos new street light SC to The President, Village Panchayat, Melasankarankuzhi in Pambanvilai SS I 100KVA under Asaripallam Section. 17)Eos to 16nos new street light sc to The President, Village Panchayat, Melasankarankuzhi in Thoppoor SS I 100KVA under Asaripallam Section. 18)Eos to 7nos additional street light SC NO:R7-474 of The President, Village Panchayat, Melasankarankuzhi in Thoppoor SS IV 100KVA under Asaripallam Section. 19)Eos to 4nos additional street light SC NO:V7-123 of The President, Village Panchayat, Melasankarankuzhi in Vembanoor SS I 100KVA under Asaripallam Section. 20)Eos to 4nos additional street light SC NO:V2-323 of The President, Village Panchayat, Kelasankarankuzhi in Parappuvilai SS I 100KVA under Asaripallam Section. 21)Eos to 7nos additional street light SC NO:R8-631 of The President, Village Panchayat, Melasankarankuzhi in Pambanvilai SS VI 100KVA under Asaripallam Section. 22)Eos to 7nos additional street light SC NO:R2-529 of The President, Village Panchayat, Melasankarankuzhi in Pambanvilai SS VI 100KVA under Asaripallam Section. 23)Eos to 3nos additional street light SC NO:R6-951 of The President, Village Panchayat, Kelasankarankuzhi in Parappuvilai Chanelkarai SS III 100KVA under Asaripallam Section. 24)Eos to 6nos additional street light SC NO:V2-838 of The President, Village Panchayat, Kelasankarankuzhi in Vembanoor SS VIII 100KVA under Asaripallam Section.25)Eos to 1no non domestic to M/S Amzes trading Private limited under parvathipuram Section. 26)Eos to 1no new street light of 8 loc in Iswarya Garden to The Commissioner, Nagercoil Corporation under PVM Section. 27)Eos to 1no new street light of 7 loc in Iswarya garden to The Commissioner, Nagercoil Corporation under PVM Section. 28)Eos to 1no new st.light of 5 locs in Antony Street to The Commissioner, Nagercoil Corporation under PVM Section. 29)Eos to 1no new st.light of 4 loc in Thendral Nagar to The Commissioner, Nagercoil Corporation under PVM Section. 30)Eos to 1no Sc connection to Vijaya Chandra Suthakar under PVM Section.31)Improvement estimate for replacement of aged conductor from ACSR 7/2.11 to AAAC 7/2.50 at Vimal Nager SS 250KVA under PVM Section. 32)DCW estimate for 1no 9mtr PSC pole as per request of Thiru.Ganapathy at Kattayvilai under PVM Section. 33)DCW estimate for shifting of 1no 9mtr RCC pole as per request of Thiru.Kuttalam at Ramavarmpuram under PVM Section. 34)DCW estimate as per request to Thiru Freedahelan under PVM Section.35)DCW estimate for shifting of 1no 8mtr PSC as per the request of Tmy.Geetha under PVM Section. 36)DCW estimate fro shifting of 1no 9mtr PSC pole as per request of Thiru.Rajan at Pallivilai under PVM Section. 37)DCW estimate for deviation of LT line as per request of Tmy.Kasal Inba Lyla at Elathaiyadi under PVM Section. 38)DCW estimate for shifting of 1no 9mtr RCC pole as per request of Thiru.Chandran at Pallivilai under PVM Section. 39)DCW estimate for shifting of 1no 8mtr PSC as per the request of Tmy.Sobana Kumari under PVM Section. 40)Eos to 1no TYSY to Thiru.Edwin Jose at lake view colony under PVM Section. 41)Eos to 1no TYSY to Thiru.Suresh Raj at Ulavurkonam under PVM Section.42)Eos to 1no ND PAL SC 114-012-1493, The Correspondent, The Pineer School MS Road under PVM Section. 43)DCW estimate as per request to Thiru Commissioner under PVM Section. 44)DCW estimate as per request to Thiru Agens Sooriya Raja under PVM Section. 45)DCW estimate for shifting of 1no 8mtr PSC pole as per request of Thiru.Vijaya Kumar under PVM Section. 46)DCW estimate for shifting of 1no 8mtr PSC pole as per request of Thiru.SelvaRaj Christopher under PVM Section. 47)DCW estimate for shifting of 1no 9mtr and 1no 8mtr PSC pole and deviation of HT line as per request of Thiru.M.Thurai Pandian at Iswrya Garden under Parvathpuram Section. 48)DCW estimate for shifting of LT line as per request of The President VP, ward 6 Kaniyakulam under PVM Section. 49)DCW estimate for shifting of 1no 9mtr PSC pole Thiru.Selvan at Kesavathiruppapuram under PVM section. 50)DCW estimate for shifting of 1no 8mtr PSC pole as per request of The President. VP Kaniyakulam under PVM Section. 51)Estimate for 1no TYSY SC to Thiru.Maria Jose at SS Nagar Under PVM Section. 52)Estimate for 1no TYSY SC to Thiru.Jegan Under PVM Section. 53)Eos to 1no TYSY SC to Tmy.Jemila Rani at Balaji Nagar under PVM Section. 54)Estimate for 1no TYSY SC to Thiru.Prabhu Under PVM Section. 55)DCW estimate for rectification of Nagammal Mill SS/25KVA Distribution Transformer Structure 1no 9mtr PSC pole and 1no 8mtr PSC pole due to dashing of Private vehicle TN 74AV4777 on 09.05.24 undder Parvathipuram Section. 56)Improvement estimate for strengthening of condductor from ACSR 7/2.11 to AAAC 7/2.50 at Keezhaperuvilai SS 250KVA under Parvathipuram Section. 57)Improvement estimate for replacement of aged conductor from ACSR 7/2.11 to AAAC 7/2.50 at Kottavilai SS 250 KVA under Parvathipuram. Section. 58)Eos to 1no TYSY SC to Thiru.Anand at Goldden Nager under Parvathipuram Section. 59)Eos to 1no TYSY SC to Thiru.Gopalakrishnan at Kaniyakulam under Parvathipuram Section.60)Eos to 1no IIIA1 S to Thiru.Tamil Sekvan at Railway Nagar, Pallivilai under Parvathipuram Section. 61)DCW estimate for shifting of 2nos 8mtr PSC pole and 1no fabricated pole 36 feet at loc no A,D,E in Rajeev Gandhi SS 100KVA as per request of Thiru.Jacob Parama Sigamony near Franklin Hospital under Parvathipuram Section. 62)Natural calamity to be replacement of 10 nos 8mtr PSC poles and line materials with ACSR 7/2.59 sq mm & 2nos 8m PSC stud pole at Pillayarvilai SS II 100 KVA DT due to fal on coconut tree under Rajakkamangalam Section.63)Natural calamity estimate for the replacement of damaged 4nos 8mtr PSC pole at loc no :FI/16,17 of Vadalivilai SS I 100KVA and loc no: FI/42,44 of Poochivilagam Ss I 100 KVA due to fallan of Coconut tree over LT line under Eathamozhy Section. 64) Natural Callamity estimate for the replacement of damaged 5nos 8mtr PSC pole at Loc no FII/22,23,24,26,30 in Amachiyarvilai SS II 63KVA due to fallen of coconut tree over LT Line under Eathamozhy Section. 65)DCW estimate to S.Kalanvathi, Kayankulam under PVM Section. 66) DCW estimate for Freeda Helen Dom under Parvathipuram Section. 67)DCW estimate for deviation of LT at loc noc A to D in Kayamkulam SS Ii 100KVA as per the request of Thiru.Siddhuvar Near four way road under Parvathypuram Section. 68)Eos to 1no TYSY SC to Tmy.P.W.Jebamalar at SS Nagar under PVM Section. 69)Natural Calamity estimate for the replacement of damaged 1no double pole ABSwitch near Panchayat Office of 11 KV kaliyankadu feeder under Parvathipuram Section. 70)Natural calamity estimate for replacement of damaged 1no 9mtr PSC pole at loc no:FI/4 of Peruvilai SS II 100KVA due to heavy rain on 16/10/2023 under Parvathypuram Section. 71)DCW estimate for shifting of 1no RSJ 36" at loc ETY-298 and dismantling of LT 8mtr PSC pole at loc FII-5 as per the request of the Assistant Engineer, Highways, Nagercoil in the Road widening at Eathamozhy main road at Eathamozhy SS IV 250 KVA in Eathamozhy Feeder under Eathamozhy Section. 72)Estimate for new street light service connection in kumarapuram area as per the request of the Executive Officer, Aralvaimozhy TP under Aralvaimozhy Section. 73) Eos to 1No Tariff V new LTCT service to Tmy.Viaishnavathi Kaliyankadu under Parvathipuram Section. 74)Eos to 1no Tariff III B service to Thiru.Robin Xavier at Chanthavilai Road under Thovalai Section. 75) Capital estimate for mew street light service connection IIA in Sc No.125-003-1815 as per request of The commissioner, Nagercoil Corporation at poochivilagam SS II 63KVA under Eathamozhy Section. 76)Capital estimate for mew street light service connection IIA in Sc No.125-003- as per request of The commissioner, Nagercoil Corporation at poochivilagam SS I 100KVA under Eathamozhy Section. 77) Capital estimate for mew street light service connection IIA in Sc No.125-002-380 as per request of The commissioner, Nagercoil Corporation at poochivilagam SS II 63KVA under Eathamozhy Section. 78) Eos to 1no IIIA indl new service connection to Thiru.Nivas at Melasoorankudy proposed new 25KVA DT under Eathamozhy section.in Kanyakumari Electricity Distribution Circle.

U S COAST GUARD USA Tender

Others
United States
Closing Date31 Jan 2025
Tender AmountRefer Documents 
Details: This Combined Synopsis/solicitation For Services Prepared In Accordance With The Format In Subpart 12.6 Of The Federal Acquisition Regulation (far) As Supplemented With Additional Information Included In This Notice. This Synopsis/solicitation Is Being Advertised As Small Business Set-aside Only. This Announcement Constitutes The Only Solicitation; No Separate Written Solicitation Will Be Issued. the Solicitation Number Is 37130pr250000028 applicable North American Industry Classification Standard (naics) Codes Are: 332618 other Fabricated Wire Product Manufacturing this Requirement Is For A Fixed Price Contract. The Contract Will Be Awarded Using Simplified Acquisition Procedures In Accordance With Far Part 13 And Part 15 the Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Best Value. when Submitting Your Proposals, Request A Price Breakdown Of The Following: a. Cost Of Labor And Supervision b. Cost Of Materials And Equipment Needed To Perform The Work. prospective Contractors Shall Also Provide Along With Your Proposal Past Performance Documents Which Will Be Used To Determine Expertise To Perform Such Work. contract Will Be Awarded To The Vendor Who Can Perform The Work Outlined In The Provided Sow. Past Performance And Cost Factors Will Also Be Used When Selecting The Award. anticipated Award Date: 10 Business Days After Close Of Solicitation, Ooa 11 Feb 2025 ***quotes Are To Be Received No Later Than Close Of Business (3 Pm Est) On Friday Jan 31, 2025. Quotes Can Be Emailed To: Mehdi.bouayad@uscg.mil quotations Sent Via The Us Postal Service Or Hand Delivered Should Be Sent To: commanding Officer Procurement & Contracting Miami 16001 Sw 117th Ave miami, Fl 33177 telephone Requests Of Quotes, Will Not Be Accepted, A Formal Notice Of Changes (if Applicable) Will Be Issued In (sam.gov | Workspace) wage Determinations: Service Contract Act Wd # 2015-4571, Revised 12/23/2024 ****** Site Visit Is Highly Recommended, However Not Mandatory, Will Be Hosting A One-day Site Visit On Wednesday 22 January 2025, At 10 Am Est At The Project Site, Please Coordinate With Emc Malcolm Holmes, Who Is The Poc On The Project. (poc Information Is Below) email: Malcolm.e.holmes@uscg.mil phone: (727) 824-7584 location Of Project: Uscg Sector St. Petersburg And Marine Safety Office Davis Island 600 8th Ave. Se st. Petersburg, Fl 33701 point Of Contact the Government Point Of Contact (poc) For This Work Is Emc Malcolm Holmes, Phone Phone: (727) 824-7584, Email: Malcolm.e.holmes@uscg.mil the Contractor Shall Coordinate With The Poc To Minimize Interference With Coast Guard Operations Or Personnel. All Work Shall Be Coordinated With Other Trades Involved In The Project And Carefully Laid Out In Advance. performance Period: Performance Of Work Is Expected To Commence Nlt 7-10 Business Days After Award Is Made. Anticipated Award Date: 07 Feb 2025 q&a’s: Questions Concerning The Work Requested Must Be Sent To Mehdi.bouayad@uscg.mil By Cob Friday Jan 24, 2025. These q&a’s Will Be Answered And Posted To This Solicitation As An Amendment Prior To Close Of Solicitation. xi: Scope Of Work: Statement Of Work For The Replacement Of Gate Operator And Increase Elevation For uscg Sector St. Petersburg 600 8th Ave. Se st. Petersburg, Fl 33701 and marine Safety Office Davis Island 1301 Beach Dr. Se, st Petersburg, Fl 33701. part 1 General intent: The Intent Of This Project Is To Replace The Gate Operators And Increase Gate Elevation At Sector St. Petersburg And Davis Island To Ensure Proper Transferring Capabilities In A Power Loss Scenario. scope Of Work This Project Involves Upgrading The Gate System By Installing New Safety And Operational Components. The Contractor Shall Provide And Install 04 Max Rhino 4000 24vdc Slide Gate Operators Or Equivalent Equipment, Ensuring That All Installation Is Performed In Compliance With The Manufacturer’s Instructions. The Gate Operators Must Be Suitable For Gates Measuring 60 Feet In Length And Weighing Up To 4,000 Lbs. The System Shall Operate On A 115/230vac Power Source Or 24vdc Solar Power, With A 24vdc Operational Voltage. The Gate Operators Must Feature Continuous Duty Brushless Motors, Capable Of Opening Gates At Speeds Of Approximately 10 To 19 Inches Per Second. Each Unit Shall Include A 24vdc Battery Backup System With Four 7-ah Batteries, Allowing Up To 200 Full Cycles On Backup Power. The Installation Shall Also include A 30-foot #50 Nickel-plated Chain, An Entrapment Prevention Device, And Six Optex 50tnr Dual-beam Photocells With Battery-powered Transmitters. Additionally, All Gate Chains Must Be Replaced With #40 Dacromet-coated Rust-resistant Chains. The Installation Requires Operator Riser Plates Measuring 2 Feet In Height, Each Mounted On 2 1/2-inch Ss40 Posts, With A Total Of Four Riser Plates To Be Provided. Existing Wiring Shall Be Extended To The New Operator Locations Using Watertight Junction Boxes, And The Contractor Shall Handle The Removal And Disposal Of Existing Operators. On-site Welding Will Be Necessary For The Installation Of Chain Brackets, And The System Must Include Five Optex Virtual Loops With A Range Of Up To 16 Feet. The Contractor Is Responsible For Ensuring The Installation Meets Industry Standards And That The Manufacturer’s 3-year Limited Warranty Is Maintained. On-site Welding Will Be Performed As Needed For The Installation Of Chain Brackets, Ensuring Structural Integrity And Proper Alignment. 3. Qualifications: Contractor Shall Provide Personnel Who Have The Knowledge, Qualifications, And Working Experience To Perform The Functions Outlined In The Performance Requirements And Shall Be A Licensed And Certified To Conduct Clean Up And Remediation Activities. All Personnel Shall Have At A Minimum An Understanding Of Operation, Maintenance Procedures, And Regulatory Requirements Associated With The Work Outlined In This Sow. continuity Of Facilities Operation: Schedule Work To Minimize Interference With The Facility’s Normal Operations. Perform All On-site Work Between The Hours Of 8:00 Am And 4:00 Pm, Monday Through Friday (federal Holidays Excluded), Unless Otherwise Approved By The Contracting Officer Or Contracting Officer’s Representative. government Furnished Materials: None part 2 Performance Standards 1. Performance Requirements: Contractor Shall Provide The Following Services: a. Removal Of All Components In Current Gate Operators At Sector St. Petersburg And Davis Island b. Installation Of All Gate Operators, Components, Safety Accessories And Elevation Lift At Sector St. Petersburg North And South Pier c. Testing Of Installed Equipment At Sector St. Petersburg North And South Pier d. All Work Working Equipment Will Be Return To The Unit e. All Damage Equipment Will Be Deposal Of By Contractor. f. Testing Of Installed Equipment At Davis Island. 2. Contractor Shall Be Responsible For Daily Removal Of All Construction Debris And Shall Ensure That Job Site Cleanliness Is Maintained For The Duration Of The Work. a. Site Assessment: 1) Conduct A Thorough Assessment Of The Installation Site. 2) Site Visit: All Bidders Are Strongly Encouraged To Visit The Site To Verify Any/all Quantities Before Submitting Bids. Interested Parties Shall Coordinate Site Visits With Emc Malcom Holmes @ (727) 824-7584 / Malcom.e.holmes@uscg.mil 3. Performance Standards. Proper Adherence To All Osha And Industry Safety Procedures Is Required Prior, During And After Work Being Performed. The Contractor Shall Furnish All Personnel With And Require Donning Of Required Personal Protective Equipment (ppe). The Contractor Shall Safeguard The Public And Government Personnel, Property, Materials, Supplies, And Equipment Exposed To Contractor Operations And Activities, And Avoid Interruptions Of Government Operations In The Performance Of Services. dcc Timothy Bakels email: Timothy.g.bakels@uscg.mil (727) 824-7599 emc Malcolm Holmes email: Malcolm.e.holmes@uscg.mil (727) 824-7584 4. Conditions Affecting The Work: The Contractor Should Visit The Site And Take Such Other Steps As May Be Reasonably Necessary To Ascertain The Nature And Location Of The Work, The General And Local Conditions Which Can Affect The Cost Of The Work Thereof. Failure To Do So Will Not Relieve Bidders From Responsibility For Estimating Properly The Difficulty Or Cost Of Successfully Performing The Work. The Government Will Assume No Responsibility For Any Understanding Or Misrepresentations concerning Conditions Made By Any Of Its Officers Or Agents Prior To The Execution Of The Contract, Unless Included In The Request For Quotes, The Specification Or Related Documents. 5. After Award Of The Contract: The Contractor Must Immediately Notify The Contracting Officer’s Qae Representative Of The Intended Start Date. The Work Shall Be Done In Accordance With The Specification. 6. Oral Modification: No Oral Statements Of Any Person Other Than The Contracting Officer Shall In Any Manner Or Degree, Modify Or Otherwise Affect The Terms Of This Contract. 7. Workmanship: All Work Shall Be Accomplished With The Best Standard Practices, And By Workmen Thoroughly Experienced In The Required Trades. The Work Shall Be Supervised By Experienced Personnel And Shall Be Satisfactory To The Contracting Officer. 8. Permits: The Contractor Shall Without Additional Expense To The Government, Obtain All Appointments, Licenses, And Permits Required For The Prosecution Of The Work. The Contractor Shall Comply With All Applicable Federal, State And Local Laws. 9. Clean Up: All Trash And Debris Shall Be Removed From The Site Daily. The Job Site Shall Be Left In A Clean And Neat Manner. 10. . Work Outside Regular Hours: If The Contractor Desires To Carry On Work On Saturday, Sunday, Holidays Or Outside The Unit’s Regular Hours (0730-1600), They Must Submit Their Request In Writing To The Contracting Officer’s Qae Representative For Approval Consideration. The Contractor Shall Allow Ample Time To Enable Satisfactory Arrangements To Be Made By The Government For Inspecting The Work In Progress. 11. Upon Completion Of Work: Contact The Contracting Officer’s Qae Representative To Arrange For Inspection/acceptance Of Work. 12. Liability Of Damages. The Contractor Shall Be Liable For All Damages To Government Equipment And Property When Such Damage Is Due To Fault Or Negligence Of The Contractor. The Contractor Shall Be Responsible For All Damages Or Injury To Persons That Occur As A Result Of The Contractor’s Fault Or Negligence. The Contractor Shall Take Proper Safety And Health Precautions To Protect The Work The Workers, The Public, And The Property Of Others. 13. 15. Safety Requirements: 14. Responsibilities:all Contractors Working On Uscg Facilities Shall Abide By All Federal Safety Regulations As Published By The Occupational Health And Safety Administration, 29 Cfr 1910 (series), 29 Cfr 1925 (series) And 29 Cfr 1926 (series). Contractor Written Safety Programs Shall Be Reviewed By The Safety Officer Prior To Starting Work. 15. Written Notification Must Be Provided To The Cg Sector St. Petersburg’s Assistant Safety Officer, Cwo Justin David @ (619) 788-7170 In Their Capacity As Fire Marshal Of Any Activity That Could Potentially Cause Fire Or Explosion Or Those Changes Or Reduces The Capability Of Fighting A Fire Or Explosion. Some Examples Of Qualifying Activities Are A Fire Hydrant Or Fire Suppression System That Must Be Taken Out Of Service For Any Reason, Electrical Work That Affects Fire Alarm Systems, Introduction Of Hazardous Or Flammable Material Onto The Unit, And Blocking Of Any Egress Routes Or Emergency Vehicle Routes. Inclusion Of This Information In The Contract Constitutes Written Notification If The Outsource Review Sheet Is Signed By Safety Officer. 16. Copies Of The Following Must Be Provided To The Safety Officer, Prior To Starting Work In Affected Areas: Confined Space Entry Permits, Hot Work Chits, And Dig Chits. Confined Space Clearance Must Be Conducted By A Certified Marine Chemist And Permit Required Spaces Will Have A Copy Of The Permit Posted On Site During Work. Hot Work applicable Far Clauses 52.212-1 -- Instructions To Offerors -- Commercial Items. (deviation 2018-o0018) Instructions To Offerors -- Commercial Items (sept 2023) 52.212-3 Offeror Representations And Certifications -- Commercial Items (may 2024) 52.212-4 Contract Terms And Conditions—commercial Items (oct 2018) 52.212-5 Contract Terms And Conditions Required To Implement Statutes Or Executive Orders -- Commercial Items (nov 2023) 52.222-41 Service Contract Labor Standards (aug 2018) work Hours: Monday Through Friday, 0730 – 1800 (7:30 Am – 3 Pm) No Weekends Or Holidays Authorized. see Attached Applicable Far Clauses By Reference. offerors May Obtain Full Text Version Of These Clauses Electronically At: Www.arnet.gov/far the Following Homeland Security Acquisition Regulations (hsar) Are Incorporated As Addenda To This Solicitation: Hsar 3052.209-70 Prohibition On Contracts With Corporate Expatriates (jun 2006); Contracting Officers Technical Representative (dec 2003) (cotr) Hsar 3052.237-72. Copies Of Hsar Clauses May Be Obtained Electronically At Http://www.dhs.gov. request Company’s Tax Id Information And Uei Number. vendors Providing An Offer Must Be Registered In Sam (system For Award Management) Prior To Close Of This Solicitation. Https://www.sam.gov/portal/public/sam/. The Vendors Sam Registration Must Be In An “active” Status Prior To Award. vendors Must Ensure That The Above Listed Naics Codes Are Listed On Their Sam Registration To Perform This Type Of Service.

BARANGAY SAGRADA, PILI, CAMARINES SUR Tender

Civil And Construction...+1Civil Works Others
Philippines
Closing Date29 Jan 2025
Tender AmountPHP 650.8 K (USD 11 K)
Details: Description Republic Of The Philippines Office Of The Punong Barangay Sagrada, Pili, Camarines Sur Bids And Awards Committee Contact No. +639857600284 Sagrada, Pili, Camarines Sur 4418 Invitation To Bid Construction Of Emergency Response Center The Local Government Unit Of Sagrada, Pili, Camarines Sur Through The 20% Barangay Development Fund (bdf) (reprogrammed 2024) Intends To Apply The Sum Of Six Hundred Fifty Thousand Eight Hundred Eighty Five Pesos (p650,885.00) Being The Approved Budget For The Contract (abc) To Payment Under The Contract For The Construction Of Emergency Response Center. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Local Government Unit Of Sagrada, Pili Camarines Sur Now Invites Bids For The The Construction Of Emergency Response Center Is Required Ninety (90) Days. Bidders Should Have Completed, Within 2 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii Instructions To Bidders. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. A Complete Set Of Bidding Documents Maybe Purchased By Interested Bidders On January 21, 2025 To February 10, 2025 At 8:00 Am. From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of One Thousand Pesos (p1,000.00) Only. Bid Must Be Delivered To The Address Below On Or Before February 10, 2025 At 8:00 Am. At The Session Hall, Barangay Sagrada, Pili, Camarines Sur. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb. Bid Opening Shall Be On February 10, 2025 10:00 A.m. At The Session Hall, Barangay Sagrada, Pili, Camarines Sur. Bids Will Be Opened In The Presence Of The Bidders Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. The Local Government Unit Of Sagrada, Pili, Camarines Sur Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Part I. General Requirements B.5 Project Billboard/signboard Est. Qty. : 1 Each A. Labor 1 Construction Foreman 1 Skilled Laborer B. Equipment Handtools ( 5 % Of Labor) C. Materials 64 Sq.ft. Tarpauline (with Coa Format) 2 Pcs. 1/4" Marine Plywood 12 Pcs. 2" X 3" X 12' Coco Lumber 8 Pcs. 2" X 2" X 12' Coco Lumber 1 Kg. Assorted Cw Nails B.9 Mobilization/demobilization Est. Qty. : 1 L.s. 1 Lot Lump Sum Part Ii. Civil, Electrical, & Sanitary/plumbing Works A. Earthworks 801(1) Removal Of Structures And Obstruction Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 2 Unskilled Laborer B. Equipment 1 Unit Jack Hammer Handtools ( 10 % Of Labor) C. Materials 803(1)a Structure Excavation (common Soil) Est. Qty. : 9 M3 A. Labor 1 Construction Foreman 3 Unskilled Laborer B. Equipment Handtools ( 10 % Of Labor) C. Materials 804(4) Gravel Fill Est. Qty. : 2.00 M3 A. Labor 1 Construction Foreman 1 Unskilled Laborer B. Equipment Handtools ( 5 % Of Labor) C. Materials 1 M3 Boulder (apple Size) 1 M3 G 1" Crushed Gravel B. Plain And Reinforced Concrete Works 900(1)c1 Structural Concrete, Class A, 28 Days Est. Qty. : 12.11 M3 A. Labor 1 Construction Foreman 2 Skilled Laborer 4 Unskilled Laborer B. Equipment 1 Unit Concrete Vibrator 1 Unit 1-bagger Mixer Minor Tools ( 10 % Of Labor) C. Materials 13 M3 G 3/4 "crushed Gravel 7 M3 Albay Sand 109 Bags Portland Cement 12 Bags Sahara 902(1)a Reinforcing Steel Bars, Grade 40 Est. Qty. : 1,227.47 Kgs. A. Labor 1 Construction Foreman 2 Skilled Laborer 2 Unskilled Laborer B. Equipment 1 Unit Bar Cutter, Single Phase (25 Mm Ø) 1 Unit Bar Bender Minor Tools ( 10 % Of Labor) C. Materials 70 Pcs. 10mm Ø Rsb 35 Pcs. 12mm Ø Rsb 52 Pcs. 16mm Ø Rsb 88 Pcs. 9mm Ø Rsb 25 Kgs. #16 G.i. Tie Wire 903(1) Formworks And Falseworks Est. Qty. : 1 L.s. A. Labor 1 Construction Foreman 2 Skilled Laborer 5 Unskilled Laborer Stripping 1 Construction Foreman 1 Unskilled Laborer B. Equipment 2 Sets H-frame 1.7m X 1.2m, Set 2 Pcs H-frames 4 Pcs Diagonal Cross Braces 4 Pcs Horizontal Braces 8 Pcs Joint Pins Minor Tools ( 10 % Of Labor) C. Materials 15 Pcs. 1/4" Marine Plywood 1,000 Bd.ft. Coco Lumber Consumables ( 5 % Of Material Cost) C. Finishing And Other Civil Works C.1. Fabricated Materials 1006(6) Steel Doors & Frame Est. Qty. 1 L.s. A. Labor Included In Material Cost B. Equipment Included In Material Cost C. Materials 1 Set D1 - Steel Grille Door (installed) (see Plan For Details) 1 Set Sd1 - Sliding Steel Door (installed) (see Plan For Details) 1010(2)b Wood Panel Door Est. Qty. 1 L.s. A. Labor Included In Material Cost B. Equipment Included In Material Cost C. Materials 1 Set D2 - Wood Panel Door With Door Jamb, Lever Type Stainless Steel Door Know $ Accessories (installed) (see Plan For Details) 1008(2) Aluminum Glass Windows Est. Qty. 1 L.s. A. Labor Included In Material Cost B. Equipment Included In Material Cost C. Materials 6 Sets W1- Awning Window With 1/4" Thk. Tinted Glass On Powder Coated Alum. Framed With Fixed Glass (installed) (see Plan For Details) 1009(2) Jalousie Window Est. Qty. 1 L.s. A. Labor Included In Material Cost B. Equipment Included In Material Cost C. Materials 1 Set W2- Tinted Glass Jalousie Window Blades On Anolok Alum. Framing (jalou Plus)(installed) (see Plan For Details) C.2. Carpentry And Joinery Works 1003(1)a1 4.5mm Fiber Cement Board On Metal Frame Ceiling Est. Qty. 14.62 M2 A. Labor 1 Construction Foreman 2 Skilled Laborer 4 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 6 Pcs. 4.5 Mm. Hardieflex Sheet (1.2 M. X 2.4 M.) 17 Pcs. Double Metal Furring 6 Pcs. Carrying Channel 15 Pcs. Hanger Bars/rod 88 Pcs. Wall Clip 4 Pcs. Wall Angle 1 Box Blind Rivet (500pcs/box) 59 Pcs. 1" Metal Screw Consumables ( 5 % Of Material Cost) 1003(4) Cabinets Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 2 Skilled Laborer 4 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 1 Set Wall Counter With Cabinet 2 Pcs. Counter Cabinet W/ Overhead Cabinet C.3. Masonry Works 1003(1)a1 100mm Chb Non-load Bearing (including Reinforcing Steel) Est. Qty. 43.39 M2 A. Labor 1 Construction Foreman 3 Skilled Laborer 2 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 565 Pcs. 100 Mm Thk Chb (non-load Bearing) 23 Bags Portland Cement 2 M3 Albay Sand 38 Pcs. 10mm Ø Rsb 5 Kgs. #16 G.i. Tie Wire C.4. Finishes 1027(1) Plain Cement Plaster Finish Est. Qty. 136.45 M2 A. Labor 1 Construction Foreman 2 Skilled Laborer 2 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 46 Bags Portland Cement 4 M3 Albay Sand 1018(1) Glazed Tiles Est. Qty. 12.90 M2 A. Labor 1 Construction Foreman 3 Skilled Laborer 3 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 85 Pcs. 400 X 400 Ceramic Glazed Floor Tiles 5 Bags Portland Cement 1 M3 Albay Sand 2 Bags Tile Grout (2kg.) 2 Bags Tile Adhesive (25 Kgs.) Consumables ( 5 % Of Material Cost) 1018(2) Unglazed Tiles Est. Qty. 1.80 M2 A. Labor 1 Construction Foreman 2 Skilled Laborer 2 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 12 Pcs. 400 X 400 Ceramic Unglazed Floor Tiles 1 Bags Portland Cement 1 M3 Albay Sand 1 Bags Tile Grout (2kg.) Consumables ( 5 % Of Material Cost) C.5. Paint Works 1032(1)a Painting Works (masonry Painting) Est. Qty. 136.45 M2 A. Labor 1 Construction Foreman 3 Skilled Laborer 5 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 3 Gal. Concrete Neutralizer 6 Gal. Concrete Sealer/primer 7 Gal. Patching Compound 7 Bags Skim Coat 3 Pail Semi-gloss Paint Consumables ( 5 % Of Material Cost) 1032(1)c Painting Works (metal Painting) Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 3 Skilled Laborer 2 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 1 Gal. Red Oxide Primer 4 Gal. Enamel Paint 2 Gal. Paint Thinner Consumables ( 5 % Of Material Cost) D. Plumbing/sanitary Works 1001(9) Storm Drainage & Downspout Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 1 Skilled Laborer 1 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 4 Pcs. 3"ø X 10" Pvc Pipe 6 Pcs. 3"ø X 45° Pvc Elbow 2 Pcs. 3"ø X 90° Pvc Elbow 6 Pcs. 3"ø Pipe Straps And Accessories 2 Pcs. 3"ø Ss, Downspout Strainer 1 Liter Solvent E. Electrical Works 1100(10) Conduit Boxes And Fittings Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 2 Skilled Laborer 3 Unskilled Laborer B. Equipment 1 Unit Electric Edger/grinder 1 Unit Electric Drill C. Materials 18 Pcs. 1/2"ø X 10' Pvc, Pns Conduit Pipe 5 Pcs. 3/4"ø X 10' Pvc, Pns Conduit Pipe 8 Pcs. Octagonal Junction Box Gauge #16 Deep Type (101mm X 101mm X 53mm) 10 Pcs. Utility Box Gauge #16, Deep Type (50mm X 101mm X 53mm) Consumables ( 5 % Of Material Cost) 1101(33) Wires And Wiring Devices Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 1 Skilled Laborer 1 Unskilled Laborer B. Equipment 1 Unit Electric Edger/grinder 1 Unit Electric Drill C. Materials 40 M. 2.0mm² Thhn Wires, Stranded 30 M. 3.5mm² Thhn Wires, Stranded 20 M. 5.5mm² Thhn Wires, Stranded 2 Sets 2-gang Switch With Plate 2 Sets 3-gang Switch With Plate 8 Pcs. Duplex Convenience Outlet, Consumables ( 5 % Of Material Cost) 1102(1) Panelboard With Main & Branch Breakers Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 2 Skilled Laborer 6 Unskilled Laborer B. Equipment 1 Unit Electric Edger/grinder 1 Unit Electric Drill C. Materials 1 Set 40 At, 2p, 230v Circuit Breaker 1 Set 20 At, 2p, 230v Circuit Breaker 1 Set 15 At, 2p, 230v Circuit Breaker 1 Set 4-hole Panel Board Consumables ( 5 % Of Material Cost) 1103(1) Lighting Fixtures Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 3 Skilled Laborer 6 Unskilled Laborer B. Equipment 1 Unit Electric Edger/grinder 1 Unit Electric Drill C. Materials 3 Sets Pinlights, 3 1/2"ø 9 Watts, Dl 4 Sets Pinlights, 11 Watts, Dl 2 Sets Emergency Lights Pre-bid - January 28, 2025, 1:00pm Bid Evaluation - February 12, 2025 Post-qualification - February 14, 2025 Notice Of Award - February 17, 2025 Notice To Proceed - February 20, 2025 For Further Information, Please Refer To: Abel B. Hernandez Bac Chairman/ Brgy. Kagawad Lgu-sagrada, Pili, Camarines Sur +639857600284

Western Philippines University Tender

Education And Training Services
Philippines
Closing Date7 Feb 2025
Tender AmountPHP 430 K (USD 7.3 K)
Details: Description 1 1 Copy Advanced Marketing Management/abante, Etc/2024 2 1 Copy Advanced Local Government And Regional Administration Development/abante, Etc/2024 3 1 Copy Advanced Production And Operation Management/abante, Etc/2024 4 1 Copy Advanced Public Fiscal Management, Finance And /abante, Etc/2024 5 1 Copy Assessment Of Learning 1/manas/2024 6 1 Copy Banking And Financial Institutions/bairan/2024 7 1 Copy Capital Markets/bairan/2024 8 1 Copy Charater Formation 1-patrotism And Nationalism/adra, Etc/2024 9 1 Copy Character Formation 2-leadership Making , Management And Administration/adra, Etc/2024 10 1 Copy Character Formation 1- Patriotism And Nationalism 3rd Ed./rondina, Etc/2024 11 1 Copy Character Formation 2-leadership Making , Management And Administration 3rd Ed./literfal, Etc/2024 12 1 Copy Comparative Model In Policing 4th Ed./castillo, Jr./2024 13 1 Copy Comparative Models Of Policing And Philippine National Police Policing ( Based On Prc Tos)/depayso/2024 14 1 Copy Criminological Research 2nd Ed./chavez, Etc/2024 15 1 Copy Criminological Research A Self Study Guide/depayso/2024 16 1 Copy Dispute Resolutions And Crises/incident Management/cano, Etc/2024 17 1 Copy Essentials Of Risk Management/banaag/2024 18 1 Copy Evidence/gabao/2024 19 1 Copy Facilitating Student-centered Teaching & Learning/larioque. Etc/2024 20 1 Copy Financial Analysis And Reporting/bairan/2024 21 1 Copy Financial Markets/bairan/2024 22 1 Copy Forensic Examination On Questioned Documents 5th Ed./alvarez/2024 23 1 Copy Forensic Photography 6th Ed./bulan/magadia/2024 24 1 Copy Fundamentals Of Criminal Investigation And Intelligence/tad-awan/2024 25 1 Copy Handbook In Juvenile Deliquency And Violence Againts Women And Their Children/barican/dausan/abordo/2024 26 1 Copy Human Behavior And Victimology /depayso/2024 27 1 Copy Human Development-understanding Criminal Behavior And Victimology/togana/2024 28 1 Copy Inclusive Education In Early Childhood Settings/boholona, Et Al./2024 29 1 Copy Income & Business Taxation/bairan/2024 30 1 Copy Introduction To Consumer Behavior/pasahol/2024 31 1 Copy Introduction To Criminology /caballero/barican/2024 32 1 Copy Introduction To Criminology/cabrillas, Et Al/2024 33 1 Copy Introduction To Cybercrime & Basic Digital Investigative Analysis 3rd Ed/lagumen/lagumen/2024 34 1 Copy Introduction To Cybercrime Investigation And Environmental Laws And Protection/detran,et Al/2024 35 1 Copy Introduction To Industrial Security Concepts /depayso/2024 36 1 Copy Introduction To Industrial Security Concepts 4th Ed/bobier/2024 37 1 Copy Juvenile Delinquency And Juvenile Justice System 2nd Ed./detran/literal/2024 38 1 Copy Law Enforcement Operationss And Planning With Crime Mapping/tancangco/2024 39 1 Copy Non- Institutional Corrections 3rd Ed/chavez Et Al./2024 40 1 Copy Practical Methods On Roads-bridge & Drainage Structures Construction/porte/2024 41 1 Copy Retail And Wholesale Enterprises/bairan/2024 42 1 Copy Special Crime Investigation With Interview And Interrogation Protocols/domingo/2024 43 1 Copy Special Education Book 1/reyes, Pascual/2024 44 1 Copy Strategic Operations Management 2nd Ed./serrano/2024 45 1 Copy Survey Of Afro-asian Literature/escalada-cordova,uytico/2024 46 1 Copy Principles Of Total Quality Management/pasahol, Etc/2024 47 1 Copy The Contemporary World/mananay,etc/2024 48 1 Copy The Teacher And The School Curriculum/gallardo/ Mañas/ 2024 49 1 Copy Theories Of Crime Causation/salamanca, Et Al/2024 50 1 Copy Teaching And Assessment Of Grammar/manas/2024 51 1 Copy Therapeutic Modalities 3rd Ed./balares Et Al./2024 52 1 Copy The Teaching Profession In The 21st Century/sarandi, Babao/2024 53 1 Copy The Teaching Profession/fernando,et Al/2024 54 1 Copy Traffic Management & Accident Investigation With Driving 2nd Ed./apela, Et Al./2024 55 1 Copy Understanding Marketing Research/mutya/2024 56 1 Copy Vice And Drug Education And Control 4th Ed/cejes/libres/ 2024 57 1 Copy Vice And Drug Education And Control /tad-awan,et Al./2024 58 1 Copy Advance Management Information System/abante,et Al./2023 59 1 Copy Computer Fundamentals/revano/2023 60 1 Copy Data Analytics & Business Intelligence/abante,et Al/2023 61 1 Copy Dispute Resolution And Incident Management/capdos/lud-ayen/2023 62 1 Copy Information Management/cortez/2023 63 1 Copy Franchising/stevens/2024 64 1 Copy Advanced Management Information Management System (mis)/abante,et.al/2023 65 1 Copy Introduction To Application Development And Emerging Technologies/pomperada/2023 66 1 Copy Principles Of Foundation Engineering Based On The National Structural Code Of The Phils. 2015/castro/2023 67 1 Copy Simplified Steel Design Asd & Lrfd Based On Nscp 2015 & Aisc's Steel Construction And Manual 14e/2023/castro 68 2 Copy Teaching Science In The Elementary Grades Vol. 2: Physics, Earth And Space Obe- & Ppst Based/bilbao, Etc/2024 69 2 Copy The Teacher And The School Curriculum Obe Approach/otiner-gallardo/2024 70 2 Copy Theoretical And Practical Textbook On Lesson Planning/ Sanchez/2024 71 2 Copy Ang Bisa Ng Pag Uulit Sa Katutubong Panitikan/yapan, Alvin B./2023 98 2 Copy Introduksiyon Sa Pananaliksik Sa Wika At Panitikan (luzon)/alvarado Et Al/2022 99 2 Copy Introduksiyon Sa Pananaliksik Sa Wika At Panitikan (vizmin)/arbasto Et Al/2022 100 2 Copy Sangguniang Aklat Ng Gramatika At Pagbuo Ng Mapa/alvarado Et Al/2023 101 2 Copy Sinesosyedad: Panunuri Ng Piling Pelikulang Panlipunan/de Leon/2023 102 2 Copy Commissary Food Service/donray/2024 103 2 Copy Readings In Philippine History/dela Vega/2024 104 2 Copy Rizal And The Development Of Filipino Nationalism /garcia, Etc/2023 105 2 Copy Transcendence: Understanding Contemporary Global Dynamics, Issues, And Challenges/calilung And Coronacion/2024 106 1 Copy Environmental And Natural Resources Laws With Commentaries, Annotations… ( Hb)/claridades/2024 107 2 Copy Introduction To Philippine Politics & Governance ( With Basic Constitutional Provisions)/baes & Beler/2024 108 2 Copy Introduction To Philippine Government And Politics With Basic Constitutional Principles 2e/riodique/2024 109 2 Copy Mathematics In Modern World/reynoso, C./2024 110 1 Copy Indigenous Creative Arts/camboles, M./2024 111 1 Copy Understading The Self/vazquez, I./2024 112 1 Copy Understanding The Self: New Normal Edition/palean,et.al/2024 113 2 Copy Biological Chemistry Obe-based/chua,et.al/2022 114 2 Copy Earth Science: Quaternary Earth, The Age Of Humans, 2e/reyes/2023 115 1 Copy Physical Science/santos/2023 116 2 Copy Gender And Society/bacolod, Et Al. /2024 117 2 Copy The Revised Penal Code Book I - Understanding Criminal Law 2nd Edition/tulalian/2024 118 2 Copy Fundamentals Of Criminal Law - Revised Penal Code Book 1/abastillas /manlusoc/2023 119 2 Copy The Revised Penal Code Book Ii, Specific Crimes And Their Elements 2nd Edition/tulalian/2024 120 2 Copy Criminal Procedure A Handbook For Criminology Students 3rd Edition/gabao/ Tulalian/2024 121 2 Copy Basic Criminal Procedure/tulalian/2022 122 2 Copy Introduction To Criminology/magtaan/ Cabrillas/2024 123 2 Copy Introduction To Criminology - A Guidebook For Criminology Instructors And Students/caballero/ Barican/2024 124 2 Copy Introduction To Criminology/rectin/2023 125 2 Copy Theories Of Crime Causation - An Instruction And Learning Guide/caballero/ Barican/2024 126 2 Copy Human Behavior And Victimology/depayso/2024 127 2 Copy Human Development - Understanding Criminal Behavior And Victimology/togana/2024 128 2 Copy Handbook In Human Behavior And Victimology/dausan Et Al/2023 129 2 Copy Professional Conduct & Ethical Standards/lud-ayen/2023 130 2 Copy Police Professional Conduct And Ethical Standards With Police Community Relations/dascil /santos/2022 131 2 Copy Handbook In Juvenile Delinquency And Violence Against Women And Their Children/barican /dausan/ Abordo/2024 132 2 Copy Dispute Resolutions And Crises / Incident Management/caño/2024 133 2 Copy Dispute Resolution And Incident Management/capdos/ Lud-ayen/2023 134 2 Copy The Research Recipe - A Guide To Writing Research Proposals In Criminal Justice (first Serving)/donato/2024 135 2 Copy Criminological Research - A Self Study Guide/depayso/2024 136 2 Copy Criminological Research 2 - A Textbook For Criminology Students/caño/2023 137 2 Copy Comparative Models Of Policing And Philippine National Police Policing (based On Prc Tos 2022)/depayso/2024 138 2 Copy Comparative Models In Policing/moyao/2023 139 2 Copy Introduction To Industrial Security Concepts/depayso/2024 140 2 Copy Law Enforcement Operations And Planning With Crime Mapping/tancangco/2024 141 2 Copy Law Enforcement Operations And Planning With Crime Mapping/taynan /lopez/2023 142 2 Copy Law Enforcement (police) Operations And Planning With Crime Mapping/florendo/2023 143 2 Copy Fingerprint - Uniqueness And Persistency Of Friction Ridge Skin Volume 1/rocamora/2023 144 2 Copy Forensic Science 2 - Personal Identification Laboratory Manual/badua/2023 145 2 Copy Forensic Photography/tad-awan/2023 146 2 Copy Deceptive Minds - Unmasking The Art Of Lie Detection/moyao/2024 147 2 Copy Introduction To The Forensic Sciences/taduran/2024 148 2 Copy Fundamentals Of Criminal Investigation And Intelligence/ Lopez/ Taynan Jr./2024 149 2 Copy Fundamentals Of Criminal Investigation And Intelligence/tad-awan/2024 150 2 Copy Essentials In Criminal Investigation/tamayo/2023 151 2 Copy Fundamentals Of Criminal Investigation With Intelligence 2nd Edition/florendo/2023 152 1 Copy Specialized Crime Investigation With Legal Medicine/dascil /santos/2023 153 1 Copy Special Crime Investigation With Interview And Interrogation Protocols/domingo/2024 154 1 Copy Vice And Drug Education And Control/tad-awan/ Lud-ayen/2024 155 2 Copy Introduction To Cybercrime And Environmental Laws/tad-awan/2024 156 2 Copy Introduction To Cybercrime And Environmental Laws/caño/2023 157 2 Copy Institutional Correction For Criminology Students/villaluz/2024 158 2 Copy Institutional Correction (new Curriculum And Cle Tos Compliant)/tumitit/ Estoque/2023 159 1 Copy Non-institutional Correction (community-based Correction In The Philippines) For Criminology Students/villaluz/2023 160 1 Copy Non-institutional Corrections/danglosi/2023 161 1 Copy Therapeutic Community Modality 1/foronda/2023 162 1 Copy Moral Philosophy And Ethics/bacuyag/2024 163 1 Copy Guiness World Records 2024 164 1 Copy Introduction To Ethics/umali,et Al/2023 165 1 Copy Leisure And Recreation Management For Tourism And Hospitality Industry/cornell/2023 166 1 Copy Living In The Information Technology Era/abante/2023 167 1 Copy Management Science ( Quantitative Methods For Business Operations Research)/sirug/2023 168 1 Copy Methods Of Research In Business Education 2nd Edition/flores/2023 169 1 Copy Professional Conduct And Ethical Standards 2nd Ed./nabe/2023 170 1 Copy Professional Salesmanship/camillar-serrano/2023 Ppc Library 171 1 Copy Criminal Justice System The Philippine Context/atty. Tutalian, V./ 2022 172 1 Copy Introduction To Criminology - A Guidebook For Criminology Instructors And Students/caballero/ Barican/ 2024 173 1 Copy Introduction To Criminology And Psychology Of Crimes/leyaley/2021 174 1 Copy Comprehensive Correctional Administration Handbook With Therapeutic Modalities/apela/2019 175 1 Copy Crime Theories, Causes & Prevention/domingo, C./2023 176 1 Copy Law Enforcement Administration 3rd Edition/manwong / 2021 177 1 Copy Law Enforcement Organization And Administration Inter-agency Approach / Taynan /lopez / 2021 178 1 Copy Comparative Models In Policing/moyao/2021 179 1 Copy Comparative Models Of Policing And Philippine National Police Policing (based On Prc Tos 2022)/2024/depayso 180 1 Copy Comparative Models In Policing 3rd Ed./ Castillo / 2023 181 1 Copy Institutional Correction For Criminology Students/ Villaluz/2024 182 1 Copy Introduction To Industrial Security Concepts/ Depayso / 2024 183 1 Copy Introduction To Industrial Security Concepts 3rd Ed. D. Bobier/2023 184 2 Copy Special Crime Investigation 1 With Legal Medicine Instructional Modules/ Rogo, A./2022 185 2 Copy Special Crime Investigation With Interview And Interrogation Protocols/ Domnigo/ 2024 186 2 Copy Special Crime Investigation With Legal Medicine 2nd Ed./2023/pltcol Sabino-diangson 187 2 Copy Character Formation 2 - Leadership, Decision Making, Management And Administration 2nd Ed/b. Literal .et.al/2023 188 2 Copy Character Formation 1 Nationalism And Patriotism 2nd Edition/caballero/ Barican/2023 189 2 Copy Forensic Photography For Criminology Students And Practitioners With Laboratory Manual 3rd Edition/2022/villarba 190 2 Copy Forensic Photography 5th Ed./m.e. Bulan/m.e. Magadia/2023 191 2 Copy Fingerprint Uniqueness Abd Persistency Of Friction Ridge Skin Vol. 1/rocamora/ 2023 192 2 Copy Fingerprint Identification (do Fingerprints Lie?)/ Leyaley/2021 193 2 Copy Human Rights Education 2nd Ed. /l.c. Rondina/m. Seguido/2023 194 2 Copy Human Rights Education A Textbook Fro Criminal Justice Education Students And Law Enforcers/tantangco And Orlain, Jr./2022 195 2 Copy Police Professional Conduct And Ethical Standards With Police Community Relations/dascil & Santos/2022 196 2 Copy Technical English 1 & 2 (legal Forms) For Criminology Students/balares/2023 197 2 Copy Technical English ( Investigative Report Writing) For Criminology Students/zaspa & Manlangit/2022 198 2 Copy Therapeutic Community Modality 1/2023/foronda 199 1 Copy Compendium Of Laws On Taxation Revised Ed, Year 2023/dascil, R./2023 200 1 Copy Basic Approach To Income Taxation/ Dimaapao/2021 201 2 Copy Income & Business Taxation/ Basiran/2024 202 1 Copy Income Taxation Laws Principles And Applications 2023-2024 Edition. Banggawan/2023 203 1 Copy Introduction To Special Civil Action/tulalian, V.t./2021 204 2 Copy Introduction To Public Administration 2e/bihasa, Cr./2022 205 2 Copy Pricing Strategy Obe Approach/agustin-acierto, M/2022 206 2 Copy Administrative And Office Management 1e/ Magno, R./2024 207 2 Copy Basic Financial Management In The Philippine Setting Obe Approach/martin, M/2022 208 2 Copy Business Laws And Regulations /dela Cruz-cada/2021 209 2 Copy The Law On Obligations And Contracts/de Leon, H./2021 210 2 Copy Essentials Of Administrative Office Management/sergote/2022 211 2 Copy Executive Leadership Advisory & Development: A Comprehensive Guide For Graduate Program Students/2024 212 1 Copy Ethics In Public Service ( Hb)/ Aquino/2023 213 1 Copy Public Fiscal Policy And Administration (hb)/gupta, S./2023 214 1 Copy Destination Management & Marketing/arenas/2022 215 1 Copy Macro Perspective Of Tourism And Hospitality/yeung/2023 216 1 Copy Marketing For Tourism And Hospitality Obe Approach/camilar-serrano, A./2020 217 1 Copy Micro Perspective Of Tourism And Hospitality/bajao Et.al/2022 218 1 Copy Kitchen Essentials & Basic Food Preparation/remaneses, Et.al/2023 219 1 Copy Kitchen Essenttials And Basic Food Preparation 2e/velasquez/2024 220 1 Copy Cost Control In Hospitality Industry/fababaer,et.al/2020 221 1 Copy Strategic Management In Tourism And Hospitality Industry W/ Total Quality Mgt./vizconde Et. Al/2021 222 1 Copy Supply Chain Management In Hospitality Industry 2e/de Castro, K/2024 223 1 Copy Ergonomics And Facilities Planning For The Hospitality Industry 2e/ Mendoza/2024 224 1 Copy International Business & Trade /lopez-mariano, N/2023 225 1 Copy International Business & Trade Obe Approach/martin, M./2021 226 1 Copy Synergizing E-commerce, Social Media, And Dropshipping: Navigating The Path To Success & Customer Satisfaction Obe Approach/garcia,et.al/2023 227 1 Copy Total Quality Management Obe Approach 2e/camilar-serrano, A./2023 228 1 Copy Banking And Financial Institutions/ Bairan/2024 229 1 Copy Personal Finance 2022 Edition/cabrera/2022 230 1 Copy Financial Management 1e/yu/2024 231 1 Copy Foundations Of Special And Inclusive Education/aligada-halal,et.al/2020 232 1 Copy Transformissional Values Education/2020 233 1 Copy Rural Development (administration And Planning)/ 9789350147801/ Gautam/2024 234 1 Copy Encyclopedia Of Science And Technology/chandra/ 2023/ 9781774693872 235 1 Copy Public Administration: Partnerships In Public Service/edwards/2024/9781639878246 236 1 Copy Microeconomics/mcconnell/23rd/9781266107887 237 1 Copy Education, Social Reform And Philosophical Development: Evidence From The Past, Principles For The Future/pring/2022 238 1 Copy Government Budgeting/kumar/2022/9789394137134 239 1 Copy Entrepreneurship And Innovation/kaur/9789392407918 240 1 Copy Attitude Of Moral Values/balakrishnan/2022 241 1 Copy Fieldwork Training In Social Work/parkash/2022 Busuanga Library 242 2 Copy Risk Management W/ Haccp As Applied To Safety, Security And Sanitation 2nd Edition/mylene Yeung/2025 243 2 Copy Macro Perspective Of Tourism And Hospitality 2nd Edition/mylene Yeung/2025 244 2 Copy Micro Perspective Of Tourism And Hospitality 2nd Edition/mylene Yeung/2025 245 2 Copy Philippine Culture And Tourism Geography 3rd Edition/mylene Yeung/2025 246 2 Copy Quality Service Management In Tourism And Hospitality 3rd Edition/chester Arenas/2024 247 2 Copy Tourism And Hospitality Marketing 2nd Edition/chester Arenas/2025 248 2 Copy Professional Development And Applied Ethics /chester Arenas/2022 249 2 Copy Legal Aspect In Tourism And Hospitality 2nd Edition/melinda Bascos/2024 250 2 Copy Entrepreneurship In Tourism And Hospitality /chester Arenas/2022 251 2 Copy Multicultural Diversity In Workplace 2nd Edition/mylene Yeung/2025 252 2 Copy Introduction To Meetings, Incentives Conferences And Events Management/chester Arenas/2025 253 2 Copy Applied Business Tools And Technologies 3rd Ed/james Saycip/2025 254 2 Copy Supply Chain Management In Hospitality Industry 2nd Ed/ Kyla De Castro/2024 255 2 Copy Medical And Wellness Tourism/porbile/2024 256 2 Copy Fundamentals Of Culinary Arts/santillan/2024 257 2 Copy Bread And Pastry/portman/2025 258 2 Copy Cookery Ncii/villasis/2025 259 2 Copy Human Resource Management In Hospitality And Tourism Industry/escobar/2024 260 2 Copy Trends And Issues In The Hospitality Industry/2026 261 2 Copy Ergonomics And Facilities Planning For The Hospitality Industry 2nd Ed/lolita Mendoza/2024 262 2 Copy Global Culture And Tourism Geography 3rd Edition/marie Angeles/2025 263 2 Copy Tour And Travel Management 3rd Edition/sarah-po/2025 264 2 Copy Transportation Management 2nd Edition/james Saycip/2025 265 2 Copy Fundamentals In Food Service Operations/bryan D. Baliste/2023 266 2 Copy Fundamentals In Lodging Operations 3rd Edition/arenas/baliste/2025 267 2 Copy Sustainable Tourism 3rd Edition/marie Angeles/2025 268 2 Copy Tourism Policy Planning And Development/ Dino Et. Al/2022 269 2 Copy Research In Tourism And Hospitality 2nd Edition/lolita Mendoza/2025 270 2 Copy Foreign Language (french And Japanese)/karol Aquino/2025 271 2 Copy Strategic Management W/ Tqm In Tourism And Hospitality Industry/vizconde Et. Al/2023 272 2 Copy Operations Management For Tourism And Hospitality Industry 2nd Ed/vizconde Et. Al/2025 273 2 Copy Heritage Tourism/vizconde Et. Al/2023 274 2 Copy Tour Guiding/vizconde Et. Al/2022 275 2 Copy Cruise Tourism/vizconde Et. Al/2021 276 2 Copy Food And Beverage Labor Cost Control 2nd Edition/lyndsey Velasquez/2024 277 2 Copy Bread And Pastry/karol Aquino/2022 278 2 Copy Meat And Poultry Fabrication 2nd Ed/lolita Mendoza/2024 279 2 Copy Food Processing 2nd Edition/jamille Jaravata/2024 280 2 Copy Tourism Information Management/lyndsey Velasquez/2021 281 2 Copy Culinary Nutrition/ Lolita Mendoza/2023 282 2 Copy Asian Cuisine/jam Melchor/2022 283 2 Copy Philippine Regional Cuisine/jam Melchor/2024 284 2 Copy Gastronomic Tourism/vizconde Et. Al/2021 285 2 Copy Food And Beverage Services/vizconde Et. Al/2025 286 2 Copy Housekeeping Operations 2nd Edition/vizconde Et. Al/2024 287 2 Copy Bar And Beverage Management/vizconde Et. Al/2024 288 2 Copy Room Division Cost Control/arenas/2022 289 2 Copy Menu Design And Revenue Management 2nd Edition/chester Arenas/2024 290 2 Copy Destination Management And Marketing 2nd Edition/chester Arenas/2025 291 2 Copy Quantity Food Production: A Guide For Commercial Cooking Nc Iii/entrata Et. Al/2022 292 2 Copy Banquet And Catering Management/vizconde Et. Al/2025 293 2 Copy Front Desk Operations/vizconde Et. Al/2022 294 2 Copy Tourism Product Development/vizconde/2025 295 2 Copy Recreation And Leisure Management/etrata Et. Al/2022 296 2 Copy International Cuisine/victoriano Et.al/2022 297 2 Copy Food Styling And Design/etrata Et. Al/2025 298 2 Copy Cookery/etrata Et. Al/2022 299 2 Copy Travel Writing And Photography/vizconde Et. Al/2024 300 2 Copy Crowd And Crisis Management/vizconde Et. Al/2022 301 2 Copy Environmental Conservation In Tourism/vizconde Et. Al/2022 302 2 Copy Trends And Issues In Hospitality Industry/etrata Et. Al /2022 303 2 Copy Quick Food Service Operations/etrata/2022 304 2 Copy Culinary Mathematics/santiago/2023 305 2 Copy Data Analytics In Hospitality/jaravata/2024 306 2 Copy Fundamentals Of Food Science And Technology/valle/2024 307 2 Copy Butchery And Fish Mongerie/valle/2024 308 2 Copy Garde Manger/bonfor/2024 309 2 Copy Classical French Cuisine/caridad/2024 310 2 Copy Specialty Cuisine/rabor/2024 311 2 Copy Halal Cookery/marinez/2024 312 2 Copy Gastronomy (food And Culture)/alba/2024 313 2 Copy Oenology (making Of Wine And Spirits)/antomio/2024 314 2 Copy Revenue Management/isla/2024 315 2 Copy Franchising /stevens/2024 316 2 Copy Commissary Food Service/donray/2024 317 2 Copy Accommodation Operations And Management/medalye/2024 318 2 Copy Hospitality And Tourism Facilities Management And Design/gutang/2024 319 2 Copy Agritourism/medalye/2024 320 2 Copy Tourism Property Management And Development/victoria/2024 321 2 Copy Tourism Estate And Integrated Resort Industry/manzano/2024 322 1 Copy Events Management, 2nd Ed./dela Cruz/2024 323 1 Copy Essentials Of Risk Management/banaag/2024 324 1 Copy Facilities Planning & Management, 2nd Ed./serrano/2024 325 1 Copy Front Office System And Procedures, Rev. Ed./lago,lim/2024 326 1 Copy Introduction To Research/sergote/2024 327 1 Copy Learning Research The Easy Way Rev.ed/uriarte/2024 328 1 Copy Mastering Modern Supply Chain For Tourism And Hospitality Industry/maranan,et Al./2024 329 1 Copy Principles Of Total Quality Management/pasahol Et Al./2024 330 1 Copy Productivity And Quality Management 2nd Ed./serrano/2024 331 1 Copy Spanish For Beginners, 2nd Ed./perez,ramonito/2024 332 1 Copy Strategic Management/austria, Etc/2024 333 1 Copy Strategic Management In Tourism And Hospitality Industry/buenaventura,gutierrez/2024 334 1 Copy Strategic Operations Management 2nd Ed./serrano/2024 335 1 Copy Sustanable Tourism: A Comprehensive Guide To Promoting Responsible Travel/maranan, Etc/2024 336 1 Copy The Evolving Landscape Of Strategic Management And Leadership/perida, Arcadio/2024 337 1 Copy Bar And Beverage Management-a Book Of Drinks 2nd Ed./bajao/osorno/2023 338 1 Copy Boarding House/jaileen F. Jimeno/2023 339 1 Copy Ergonomics And Facilities Planning For The Hospitality Industry /buenaventura/2023 340 1 Copy Fundamentals In Lodging Operations/sarah Monson-po/2023 341 1 Copy Fundamentals Of Lodging Operations With Housekeeping Laboratory Manual/bajao/osorno/2023 342 1 Copy Kitchen Essentials And Basic Food Preparation/remaneses, Et Al./2023 343 1 Copy Operations Management In Tourism And Hospitality/buenaventura, Et Al./2023 344 1 Copy Practicum Manual For Tourism And Hospitality Management/taoing,cabugon/2023 345 1 Copy Professional Development And Applied Ethics/cabulay/2023 346 1 Copy Quality Service Management In Tourism And Hospitality/buslon/osorno/2023 347 1 Copy Professional Conduct & Ethical Standards/lud-ayen/moyao/2023 348 1 Copy Quantity Cookery And Catering Management ( A Guide To Students,leading To Commercial Cooking Nc Iii)/prades/2023 349 1 Copy Risk Management As Applied To Safety Security And Sanitation 2nd Ed/somoray/2023 350 1 Copy Sustainable Tourism/bajao/osorno/2023 351 1 Copy Sustainable Tourism/santos/2023 352 1 Copy Applied Business Tools And Technologies In Hotel And Restaurant Management (hrm)/gonzalo, Etc/2023 353 1 Copy Foreign Language I (basic French For Hospitality Management And Tourism I)/ Tomas/2022 354 1 Copy Foreign Language Ii (basic French For Hospitality Management And Tourism I)/tomas/2022 355 1 Copy Tourism Policy Planning And Development/cruz/2022 356 1 Copy Fundamentals In Food Service Operations/yao/2022 357 1 Copy Supply Chain Management In Hospitality Industry/baluyot/2022 358 1 Copy Assessment Of Learning 1/manas/2024 359 1 Copy Charater Formation 1-patrotism And Nationalism/adra/2024 360 1 Copy Character Formation 2-leadership Making , Management And Administration /adra/2024 361 1 Copy Character Formation 1- Patriotism And Nationalism 3rd Ed./rondina/2024 362 1 Copy Character Formation 2-leadership Making , Management And Administration 3rd Ed./literal/2024 363 1 Copy Entrepreneurial Behavior Growth Mindset And Fixed Mindset/pasahol/2024 364 1 Copy Entrepreneurial Management/ybanez/2024 365 1 Copy Facilitating Student-centered Teaching & Learning/larioque,et Al./2024 366 1 Copy First Aid, Rescue And Water Safety: A Self-regulated Learning Module /dogui-is/2024 367 1 Copy Gender And Society/bacolod, Et, Al./2024 368 1 Copy Inclusive Education In Early Childhood Settings/boholona, Et Al./2024 369 1 Copy Introduction To Criminology /caballero/barican/2024 370 1 Copy Introduction To Criminology/cabrillas, Et Al/2024 371 1 Copy Introduction To Research/sergote/2024 372 1 Copy Learning Research The Easy Way Rev.ed/uriarte/2024 373 1 Copy Moral Philosophy And Ethics/bacuyag/2024 374 1 Copy (path-fit 2) Physical Activity Towards Health And Fitness Rhytmic Dance And Social Activities/punzalan,habana/2024 375 1 Copy Promoting Community Change Through Civic Welfare Training Service 2/corpuz/2021 376 1 Copy Special Education Book 1/reyes,pascual/2024 377 1 Copy The Contemporary World/mananay/2024 378 1 Copy The Teacher And The School Curriculum/gallardo/mañas/2024 379 1 Copy Theories Of Crime Causation/salamanca, Et Al/2024 380 1 Copy Therapeutic Modalities 3rd Ed./balares Et Al./2024 381 1 Copy The Teaching Profession In The 21st Century/sarandi, Babao/2024 382 1 Copy The Teaching Profession/fernando,et Al/2024 383 1 Copy Understanding Society And Culture/riodique Iii/2024 384 1 Copy Upscaling Oral Communicationskills In The 21st Century Global Space/gutierrez, Et Al/2024 385 1 Copy Microeconomics Theories And Applications/marcelo/2023 386 1 Copy "technology For Teaching And Learning 1/ronato S. Ballado Marlo D. Alvarez, Alejandro L. Giray Jr./ 2023" 387 1 Copy Code Of Ethics Of Professional Teachers/estrada/2023 388 1 Copy A Course Module For Science In Early Childhood Education/joel Bernal Faustino , Eden Joy Pastor Alata, Antonnette Pawilen/2024 389 1 Copy A Course Module For Science In Early Childhood Education 1e/faustino/2024 390 2 Copy Fundamentals Of Criminal Investigation And Intelligence/tad-awan/2024 391 1 Copy Handbook In Juvenile Deliquency And Violence Againts Women And Their Children/barican/2024 392 1 Copy Human Behavior And Victimology /depayso/2024 393 2 Copy Human Development-understanding Criminal Behavior And Victimology/togana/2024 394 1 Copy Intelligent Leadership Resilience/perida/2024 395 1 Copy Introduction To Cybercrime & Basic Digital Investigative Analysis 3rd Ed/detrane/2024 396 1 Copy Introduction To Industrial Security Concepts /depayso//2024 397 1 Copy Introduction To Industrial Security Concepts 4th Ed/bobier/2024 398 1 Copy Introduction To Philippine Government & Politics With Basic Constitutional Provisions/baes/2024 399 1 Copy Juvenile Delinquency And Juvenile Justice System 2nd Ed./detran/2024 400 1 Copy Law Enforcement Operationss And Planning With Crime Mapping/tancangco/2024 401 1 Copy Learn And Enjoy Intermediate Statisitcs The Easy Way-advanced Volume 2 Rev. Ed/uriarte/2024 402 1 Copy Learn And Enjoy Statisitcs The Easy Way-basic Volume 1 Rev. Ed/uriarte/2024 403 1 Copy Microeconomics Numerical And Computational Approach/paurom/2024 404 1 Copy Non- Institutional Corrections 3rd Ed/chavez/2024 El Nido Library 405 1 Copy Introduction To Criminology/caballero/barican/2024 406 1 Copy Introduction To Criminology / Cabrillas, Et. Al/2024 407 1 Copy Facilities Planning & Management, 2nd Ed./serrano/2024 408 1 Copy Events Management, 2nd Ed./dela Cruz/2024 409 1 Copy Concepts And Approaches In Inventory Management And Control/banaag, Et.al/2024 410 1 Copy Entrepreneurial Behavior Growth Mindset And Fixed Mindset/pasahol, Et.al/2024 411 1 Copy Essentials Of Risk Management/banaag/2024 412 1 Copy Front Office System And Procedures, Rev. Ed./lago, Lim/2024 413 1 Copy Handbook In Juvenile Deliquency And Violence Againts Women And Their Children/boholona, Et. Al/2024 414 1 Copy Moral Philosophy And Ethics/bacuyag/2024 415 1 Copy Multicultural Diversity In The Tourism Hospitality Workplace: A Comprehensive Guide For Professionals/maranan, Et.al/2024 416 1 Copy (path-fit 2) Physical Activity Towards Health And Fitness Rhytmic Dance And Social Activities/punzalan, Habana/2024 417 1 Copy Promoting Community Change Through Civic Welfare Training Service 2/briones, Et.al/2024 418 1 Copy Strategic Management In Tourism And Hospitality Industry/buenaventura,gutierrez/2024 419 1 Copy Sustanable Tourism: A Comprehensive Guide To Promoting Responsible Travel/maranan, Et.al/2024 420 1 Copy The Teaching Profession In The 21st Century/sarandi, Babao/2024 421 1 Copy Teaching And Assessment Of Grammar/manas/2024 422 1 Copy Understanding Society And Culture/riodique Iii/2024 423 1 Copy Vice And Drug Education And Control /tad-awan,et Al./2024 424 1 Copy Juvenile Delinquency And Juvenile Justice System 2nd Ed./detran/2024 425 1 Copy Introduction To Philippine Government & Politics With Basic Constitutional Provisions/baes/2024 426 1 Copy Human Development-understanding Criminal Behavior And Victimology/togana/2024 Canique Library 427 1 Copy Entrepreneurial Behavior Growth Mindset And Fixed Mindset/pasahol, Et.al/2024 428 1 Copy An Eye For Art Appreciation: Perception And Expression,2nd Ed./sonsona, Et.al/2024 429 1 Copy Gender And Society/bacolod, Et.al/2024 430 1 Copy Introduction To Philippine Government & Politics With Basic Constitutional Provisions/baes/2024 431 1 Copy The Life And Works Of Rizal/sanchez, Et.al/2024 432 1 Copy The Contemporary World//mananay, Et.al/2024 433 1 Copy Understanding Society And Culture/riodique Iii/2024 434 1 Copy Upscaling Oral Communicationskills In The 21st Century Global Space/gutierrez, Et Al/2024 435 1 Copy Organic Farming/loreto/2021 436 1 Copy Organic Fungicides/loreto/2021 437 1 Copy Organic Gardening/loreto/2021 438 1 Copy Mathematics In Modern World/reynoso, C./2024 439 1 Copy Nstp 1 Guide In Civic Welfare Training Service/lonez/2023 440 1 Copy Physical Activity Towards Health & Fitness 1 (path-fit 1) Health & Wellness, Movement Education And Exercise Program/punzalan,et Al/2023 441 1 Copy Physical Activities Towards Health And Fitness( Pathfit 2) Combative Sports & Outdoor Recreational Activities/bulatao, Et Al/2023 442 1 Copy Biological Chemistry Obe-based/chua,et.al/2023 Culion Library 443 1 Copy Understanding Society And Culture/riodique Iii/2024 444 2 Copy Upscaling Oral Communicationskills In The 21st Century Global Space/gutierrez, Et Al/2024 445 1 Copy Organic Farming/loreto/2021 446 1 Copy Organic Fungicides/loreto/2021 447 1 Copy Organic Gardening/loreto/2021 448 1 Copy Mathematics In Modern World/reynoso, C./2024 449 1 Copy Nstp 1 Guide In Civic Welfare Training Service/lonez/2023 450 1 Copy Physical Activity Towards Health & Fitness 1 (path-fit 1) Health & Wellness, Movement Education And Exercise Program/punzalan,et Al/2023 451 1 Copy Physical Activities Towards Health And Fitness( Pathfit 2) Combative Sports & Outdoor Recreational Activities/bulatao, Et Al/2023 452 1 Copy Biological Chemistry Obe-based/chua,et.al/2023 453 1 Copy Entrepreneurial Behavior Growth Mindset And Fixed Mindset/pasahol, Et.al/2024 454 1 Copy An Eye For Art Appreciation: Perception And Expression,2nd Ed./sonsona, Et.al/2024 455 1 Copy Gender And Society/bacolod, Et.al/2024 456 1 Copy Introduction To Philippine Government & Politics With Basic Constitutional Provisions/baes/2024 457 1 Copy The Life And Works Of Rizal/sanchez, Et.al/2024 458 1 Copy The Contemporary World//mananay, Et.al/2024 Rio Tuba Library 459 1 Copy Mathematics In Modern World/reynoso, C./2024 460 1 Copy Art Appreciation 2e/sanchez,et.al/2023 461 1 Copy Art Appreciation For College Students/leano/2018 462 1 Copy Ethics/mondares,r/2024 463 1 Copy Understading The Self/vazquez, I./2024 464 1 Copy Environmental Science For All/cobar, L./2022 465 1 Copy Environmental Science/calimlim/2021 466 1 Copy Nstp 1 Guide In Civic Welfare Training Service/lonez/2023 467 1 Copy Physical Activity Towards Health & Fitness 1 (path-fit 1) Health & Wellness, Movement Education And Exercise Program/punzalan,et Al/2023 468 1 Copy Physical Activities Towards Health And Fitness( Pathfit 2) Combative Sports & Outdoor Recreational Activities/bulatao, Et Al/2023 469 2 Copy Physical Activities Towards Health And Fitness Pathfit 2( Exercise-based Fitness Activities/ballecer,et Al/2023 470 2 Copy Physical Activity Towards Health And Fitness 3 (path-fit 3 )menu Of Dance/punzalan, Et Al./2023 471 2 Copy Physical Activity Towards Health And Fitness ( Path-fit 4 Sports)individual/dual And Team Sports/bulatao, Et Al/2023
2881-2890 of 2897 archived Tenders