Fabrication Tenders

Fabrication Tenders

BARANGAY 152 ZONE 14 DISTRICT II MANILA Tender

Others
Corrigendum : Tender Amount Updated
Philippines
Closing Soon10 Feb 2025
Tender AmountPHP 398.3 K (USD 6.8 K)
Details: Description Republic Of The Philippines City Of Manila Barangay 152, Zone 14, District Ii Bids And Awards Committee January 31, 2025 D A T E Invitation To Bid Barangay 152, Zone 14, District Ii Invites Interested To Bid For The Supplies/materials And/or Equipments Of The Following: Item Quantity Unit Description 1 30 Box Bond Paper Legal Size 8.5 X 14, 5ream 2 30 Box Bond Paper Letter Size 8.5 X 11, 5ream 3 30 Ream Special Paper 200gsm 4 5 Box Panda Ballpen Black/red 12pcs 5 5 Box Pentel Pen Black 6 10 Btl Computer Ink Refill Black 250ml 7 10 Set Computer Ink Refill C,m,y 250ml 8 4 Pc Usb Flash Drive 3.0 128gb 9 10 Pc Correction Tape 8m 10 4 Pc Stamp Pad 11 6 Box Staple No. 10 12 70 Tank Refill Of Fire Extinguisher, 10lbs 13 1 Unit Heavy Duty, Mobile, Fabricated Steel Ladder The Bid Proposal Shall Be Submitted To The Barangay Treasurer On/or Before February 10, 2025 And It Will Be Opened Immediately On February 10, 2025 At 1:00 P.m. Infront Of The Barangay Activity Area (barangay Hall) Attending Bidders Or Their Authorized Representatives And Accounting, Manila Barangay Bureau (mbb) And Commission On Audit (coa) Representative. The Venue Of The Bidding Will Be At The Barangay 152, Zone 14, District Ii, Manila. Jervie Delos Reyes Bac Chairman Requesting Officer/end-user: Barangay 152, Zone 14, District Ii, Manila Approved Budget For The Contract (abc): Php 398,323.00 Source Of Fund: Ab 2025 Mooe – Php 190,000.00 Rrmf – Php 208,323.00 Total: Php 398,323.00 Copy Furnished: Accounting Department Commission On Audit (coa) Manila Barangay Bureau (mbb)

MINARM/SCA/PFC-RBT Tender

France
Closing Soon10 Feb 2025
Tender AmountRefer Documents 
Manufacture of small individual equipment for food

Department Of Public Works And Highways - DPWH Tender

Metals and Non-Metals...+1Furnitures and Fixtures
Corrigendum : Closing Date Modified
Philippines
Closing Soon7 Feb 2025
Tender AmountPHP 169.4 K (USD 2.8 K)
Details: Description Fabrication And Installation Of 1-3/4 X 1-3/4 Power Coated White Tubular Aluminum Frame

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Closing Date21 Feb 2025
Tender AmountRefer Documents 
Details: Contact Information|4|n792.06|s8r|215-697-0275|patrick.j.horan23.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement|8|x|||||||| inspection And Acceptance Of Supplies|26|x||||||||||||x|||||||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo Type ||tbd|n00383|tbd|tbd|see Schedule|tbd||||||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|12 Months|60 Days After Discovery Of Defect||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|332439|600||||||||||| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x| interested Vendors Should Submit A Tiered Pricing Repair Proposal. please Submit An Evaluation Price As Well As Pricing For Minor, Moderate, And Major Repair Tiers. \ navsup Wss Has Been Granted A Class Deviation (cl-00-203) That Permits Us To Use The Award Forms Currently Available In Our Automated Procurement System Instead Of The Sf 1449 When Conducting Procurements For Commercial Items. this Procurement Is Being Conducted In Accordance With Far Part 12, Acquisition Of Commercial Products. information Appearing On The Face Of The Dd Form 1155 Or Sf 26 That Conflicts With Clauses Or Provisions Contained Elsewhere In This Solicitation Shall Be Disregarded. addendum To Far 52.212-4 Contract Terms And Conditions Commercial Products Under Paragraph(a) "inspection And Acceptance" Add The Following: 1. Far Clause 52.246-2 Inspection Of Supplies-fixed Price Applies As Amended Herein. All Product Audits Performed At The Discretion Of The Dcma Qar Shall Be Conducted By Witnessing Contractor Inspections Or Tests On A Non-interference Basis. erference Basis. 2. The Contractor Shall Maintain A Quality System That Addresses The Elements Of Iso9001-2000/as9100b, Quality System Model For Quality Assurance In Design/development, Production, Installation And Servicing, And A Calibration System That Addresses The Elements Of Iso-10012-1, Ansi/ncsl Z540 Or An Equivalent Program Approved By The Navy. 3. The Government Reserves The Right To Assess The Contractor's Compliance To Its Documented Quality System Throughout The Performance Of This Contract. The Quality System Shall Be Made Available To The Government For Their Review And Use. The Acceptance Of non-conforming Supplies Is A Prerogative Of And Shall Be As Prescribed By The Government. The Government Reserves The Right To Disapprove The Quality System Or Portions There Of When It Fails To Meet Its Intended Objectives. eserves 4. The Contractor Shall Not Make Any Configuration Changes, Engineering Changes Or Part Number Changes To The Contract/purchase Order Items, Including, But Not Limited To, The Item's Hardware, Software Or Firmware, Unless Approved By The Procurement contracting Officer (pco). In Addition, Approval By The Appropriate Technical Authority May Also Be Required. Guidance On How To Submit A Proposed Engineering Or Part Number Change May Be Obtained From The Pco. 5. The Contractor Shall Not Manufacture Any Item For Acceptance By The Government That Incorporates A Known Departure From Technical Or Contractual Requirements Unless A Request For A Deviation Has Been Approved. Authorized Deviations Are A Temporary Departure from The Requirements Only And Do Not Authorize A Change To The Item's Configuration Baseline. Any Deviation, Major Or Minor, Must Be Approved By The Pco Prior To Acceptance. the Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. In Addition To Price, The Following non-price Evaluation Factor Shall Be Used To Evaluate Offers And Are Listed In Descending Order Of Importance. relevant Past Performance technical Capability the Non-price Evaluation Factors, When Combined, Are Significantly More Important Than Price. There Are No Subfactors. the Government Reserves The Right To Obtain Information For Use In The Evaluation Of Past Performance From Any And All Sources Including Sources Outside Of The Government. Offerors Lacking Relevant Past Performance History Will Not Be Evaluated Favorably Or unfavorably On Past Performance. The Government Will Consider The Quality Of An Offeror's Relevant Past Performance. This Consideration Is Separate And Distinct From The Contracting Officer's Responsibility Determination. The Assessment Of The Offeror's R relevant Past Performance Will Be Used As A Means Of Evaluating The Relative Risk Of The Offeror And Other Competitors In Successfully Meet The Requirements Of The Rfp. In Determining The Rating For The Past Performance Evaluation Factor, The Government Will Give Greater Consideration To The Contracts Which The Government Feels Are Most Relevant To The Rfp. the Government Reserves The Right To Award The Contract To Other Than The Lowest Priced Offeror. page Limitation-excluding The Cover Page, Table Of Contents, Past Performance Project Forms The Technical Capability Proposal Is Limited To Fifteen (25) Pages In At Least 11pt. Font And 1" Margins. Pages In Excess Of This Limitation Will Not Be Evaluated. The pages Excluded From Evaluation Will Be At The Discretion Of The Agency. contractors Are Informed That It Is The Government's Desire To Make Award On Initial Proposals When Deemed Possible By The Contracting Officer, However The Government Reserves The Right To Communicate And/or Negotiate With Offerors If Later Determined Necessary. none Price Proposal (all Non-price Factors) -the Contractor Is Required To Submit The Following Non-price Information: 1. Relevant Past Performance: the Contractor Is Provided An Opportunity To Demonstrate Relevant Past Performance On Contracts Currently Being Performed Or Performed Within The Past Three (3) Years. The Government Will Determine Relevance By Analyzing The Scope And Magnitude Of The Reference contracts And Comparing Them To The Instant Requirement. The Government Reserves The Right To Evaluate Submitted Projects Individually Or In The Aggregate In Order To Determine Relevance And Will Do So Consistently Across All Evaluated Offers. The Government will Consider The Quality Of The Contractor's Relevant Past Performance. reference Contracts: A. The Contractor May Submit Up To A Maximum Of Three (3) Contracts For Evaluation. The Government Reserves The Right To Obtain Information From Sources Other Than Those Identified By The Contractor. 2. Technical Capability the Government Desires That Offerors Demonstrate Technical Capability To Satisfy The Government's Requirements. The Offeror's Response Will Be Evaluated To Determine Whether Its Response Poses Risk To Performance Or Whether It Will Result In Better Value To The government. In Response To This Evaluation Factor, Offerors Shall Address Its Manufacturing Equipment; Inspection Method Sheets; Incoming Inspection Sheets; Process Sheets; Quality System Compliance; Welding Certification. in Responding To The Above Areas Of The Technical Capability Factor, It Is Incumbent Upon The Offeror Provide A Level Of Detail The Demonstrates To The Government's Satisfaction That The Offeror Has The Technical Capability To Perform The Requirement. If The proposal Lacks Sufficient Detail, It May Result In The Government Assessing Risk In The Proposal. While There Is No Prescribed Method For Demonstrating Technical Capability, The Below Are Items Of Interest To The Government That The Contractor May, At Its discretion, Address To Assist The Government In Gaining An Understanding Of The Offerors Technical Capability. Offerors Are Cautioned That While These Areas Of Interest Are Not Mandatory Elements That Are Required To Be Addressed, Failure To Address Them Or comparable Indicia Of Technical Capability, May Limit The Government's Understanding Of Technical Risk And Result In The Assignment Of Commensurate Risk. Offerors Are Also Notified That Some Of These Indicia Of Capability Are Overlapping, I.e., Two Or More May evidence The Same Facet Of Capability. certification Of Possession Or Access To The Following Equipment:for Aluminum And Steel Welded Containers, & Bladebox/riveted Construction 1.brake Press 2.extrusion Dies 3.cnc Machining Center(s) Capable Of Lathe And/or Milling Operations copies Of Inspection Method Sheets Used In-process And/or At Final Inspection copies Of Incoming Inspection Documents That Show Material Certificates Of Conformance, And If Applicable, Dimensional Conformance process/operation Sheets To Show Ability To Conform To Drawing Requirements In The Following Areas: Weld Preparation; Welding Procedure Specifications Production Lot Testing proof Of Compliance To Iso9001, And/or, As9100. applicable Up-to-date Welder Certifications Showing Highest-level Certification Obtained Aws D1.1 For Steel, Aws D1.2 Or Mil-w-22248,class 4 For Aluminum, Aws D1.3 For Sheet Steel And Aws D1.6 For Stainless Steel. if The Offeror Address Any Or All Of The Above, Or Provides Comparable Indicia Of Capability, It Is Encouraged To Provide Supporting Evidence And Detail, Such As But Not Limited To Receipts, Certifications, Drawings, Test Results/ Logs, Maintenance Records, calibration Records, Inspection Reports, Audits, Etc. The Weigh Accorded To Supporting Evidence Will Be At The Discretion Of The Government. the Technical Capability Proposals Will Be Evaluated To Determine The Risk Of Unsuccessful Performance As Well As Relative Risk Compared To Other Offerors. repair Turnaround Time (rtat) Definition: The Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. the Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In The Subsequent Contract. required Rtat: ## 103 Days After Receipt Of Asset throughput Constraint: Contractor Must Provide A Throughput Constraint For Each Nsn(s). Total Assets To Be Repaired Monthly After Initial Delivery Commences X/month (contractor Fill In #). A Throughput Of ##____ Per Month Reflects No Throughput Constraint. Induction Expiration Date: 365 Days After Contract Award Date. Any Asset Received After This Date In Days Is Not Authorized For Repair Without Bi-lateral Agreement Between The Contractor And Navsup Wss contracting Officer. reconciliation:a Reconciliation Modification Will Be Issued After Final Inspection And Acceptance Of All Assets Inducted Under The Subsequent Contract. The Parties Have Agreed To A Price (shown On The Schedule Page) For Each Unit At The Negotiated Rtat. Such prices Are Based On The Contractor Meeting The Rtat Requirements Described Within The Schedule Page. If The Contractor Does Not Meet The Applicable Rtat Requirement, Consideration Will Be Assessed And Subject To Negotiation. all Contractual Documents (i.e. Contracts, Purchase Orders, Task Ordersdelivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein. early And Incremental Deliveries Accepted And Preferred. \ 1. Scope 1.1 Pre-award / Post Award Requirements: due To The Critical Use Of This Item And Its Quality History, A Pre-award Survey And Post-award Conference May Be Required For All New Manufacturers. For All Previous Sources, A Post-award Conference May Be Recommended. 1.2 Container Shell Material Is ;aluminum; . 1.3 When Discrepancies Exist Between These Requirements And Those On Current manufacturer's Drawings,contact Code ;buyer On Page 1 Of The Contract; Or Code N241.10 1.4 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With � See Schdule/line Item�,and All Details And Specifications Referenced Therein. 1.5 Articles To Be Furnished Hereunder Shall Be Repaired, Tested And Inspected In Accordance With The Terms And Conditions Specified In The Requirements Section Of This Document. 1.5.1 Any Item Contracted For Repair Shall Have A Statement Of Work To Ensure Compliance With All Repair Procedures And Requirements. repair Of: shipping And Storag ;6kh 8145 013574414; Nsn , ;583e001; Part Number, Shall Be Performed Iaw: Shipping And Storag ;ag-830ac-meb-000 Work Package 025 00; Publication (s). 1.5.2 There Will Be No Repair Deviation From The Approved Written Procedures Without Review And Acceptance By The Basic Design Engineer. All Requests For Waiver/deviation Shall Be Via Form 1694 Routed Throught The Local Dcma/aco Office For Review And recommendations Via Form 1998. 2. Applicable Documents - Not Applicable 3. Requirements 3.1 One Third (1/3) Unit Of Desiccant (mil-d-3464, Type Ii Nondusting) Per Cubic Foot Of Container Interior Volume Shall Be Placed In Desiccant Holder Of Each Container At Time Of Shipment. 3.2 Reference To Cadmium Plating Shall Be Deleted And The Following Substituted: "finish Shall Be Electrodeposited Alkaline Zinc-nickel Alloy In Accordance With Astm B 841 Class 1, Type B, Grade 3." all Containers Must Be Affixed With A Nameplate That Includes A unique Identification (uid) Marking As Referenced In The Drawing Package drawing ;(80132) 15930; And Iaw Mil-std-130 Latest Revision. The Contractor shall Contact Navicp Code ;contact Buyer On Page 1 Of The Contract; Or Code 0771.10 For The Alphanumeric sequential Serial Number Group That Makes Up Part Of The Uid. the Uidwill Be Included On The Nameplate In Data Matrix Format. contact Code ;buyer On Page 1 Of The Contract; Or Code N241.10 To Arrange For First Article Test Location when A First Article Is Required, The Contractor Shall Submit A Paper Copy Of The Drawings (size 11" X 17"), Contracts And Approved Ecp's Eco's, Deviations Waivers, And Modifications In The Records Recepticle Or Inside The Container Submitted For The First article. 3.3 Welding And Welder Qualifications Shall Be In Accordance With Aws D1.1 for Steel, Aws D1.2 Or Mil-w-22248,class 4 For Aluminum, Aws D1.3 for Sheet Steel And Aws D1.6 For Stainless Steel. Proper Controls Shall Be Used To Prevent Melt Through Or Burn Through. For Aluminum, Filler For Welding 6061 Alloy Shall Be 4043: Filler For Welding 5000 Series Alloys to Themselves Or To 6061 Shall Be 5356 Or 5556. In Addition,welding And weld Inspection Shall Include: (1) Visual Inspection Shall Include 5x (5power) Magnification When A Suspect condition Is To Be Examined Beyond The Capability Of Normal Vision. (2) Critical And Major Welds May Be Subjected To Further Non Destructive testing (such As Dye Penetrant Inspection)as Prescribed By The Buying Activity. (3) Proper Documentation Shall Be Available For Review By Government Personnel. 3.4 Work Instructions. Work Instructions Shall Be Posted At Theoperator's Work Station Giving Procedures To Control The Welding Process, I.e., Filler Material, Weld Size, Electrical And Gas Characteristics, Including Flow Rate. 3.5 Materials And Materials Control. The Quality Program Shall Assure That The Materials Used In Fabrication Or Processing, I.e., Base Metals And Weld Filler Material, Be Inspected And Conform To The Applicable Physical, Chemical And Other Technical requirements (supplier's Certification Is Sufficient). 3.6 Controls. Weld Filler Materials Shall Be Clearly Identified And Segregated From Each Other Both When In Storage And At The Work Station. Work Station Environment Shall Be Controlled To Prevent Conditions Adverse To Proper Gas Shielding. 3.7 Cleaning. Parts To Be Welded Shall Be Cleaned To Remove Surface Soils Such As Oils, Waxes, Grease, Inks, Etc. Except That Uninhibited Alkaline Solutions Such As Sodium Hydroxide Shall Not Be Used. 3.8 Deoxidizing. The Cleaned Parts Shall Be Chemically Deoxidized No More Than 10 Days Prior To Welding To Remove Thick Surface Oxide Films. (if The Material Or Work Is Exposed To An Outdoor Environment, This Time Limit Shall Be Reduced To A Maximum Of 3 Days, to Account For Atmospheric Effects.) Mechanical Cleaning Methods Shall Be Applied Just Prior To The Actual Start Of Welding, To Remove Any Reoxidation Or Residual Thin Oxide Films. 3.8.1 Chemical Treatment. An Acid Deoxidizing Treatment Shall Be Applied By Either Immersion Or Brushing/wiping. Deoxidizers Acceptable For Use Shall Include Nitric Acid, Sulfuric Chromic, Phosphoric Chromic, Or Equivalent Solutions. Sodium Hydroxide solutions Shall Not Be Used. Care Shall Be Taken To Assure 100% Solution Coverage Of The Area To Be Welded. To Allow An Adequately Sized Deoxidized Area For Good Welding, The Solution Shall Be Applied To An Area Extending At Least 2 Inches From The Weld Site, or Ending At Any Closer Adjacent Edge. 3.8.2 Mechanical Means. Immediately Prior To Welding, Mechanical Cleaning Methods Shall Be Applied To The Weld Areas Previously Chemically Treated To Assure Removal Of Residual Or Reformed Oxides, If Any. Acceptable Methods Of Mechanical Cleaning Include stainless Steel Wire Brushing, Scraping, Filing, Or Sanding. However, Abrasives Containing Iron And Its Oxides, Steel Wool And Wire, And Copper Alloy Based Wire, Which May Become Embedded With Galvanically Active Metals And Accelerate Corrosion Of Aluminum alloys Shall Not Be Used. Mechanical Methods Shall Be Vigorous Enough To Adequately Remove Any Residual Oxide Films, But Gentle Enough To Avoid Forming An Excessively Rough Surface In The Comparatively Soft Metal Underneath. 3.9 At Faying Surfaces, Discontinuous Welds, Or Other Areas Where Atmospheric Liquids May Be Retained By Capillary Action, The Crevice Shall Be Sealed Using Sealing Compound Mil-s-81733 Or Equivalent. 3.10 The Shock Mount Listed In The Drawing Package (whether Identified As Sole Source, Recommended, Or Suggested) Has Been Tested And Approved For The Shock Mitigation System Of This Container. No Other Shock Mount May Be Substituted Without Written Permission of Naval Inventory Control Point, Philadelphia Unless An Alternate Is Specifically Indentified In This Contract. ;no Other Mount; Is An Approved Alternate Mount. welding And Welder Qualifications Shall Meet Current Aws D1.2 Standards. additionally, Cleaning Preperations Shall Be In Accordance With Mil-c-5541 and The Cleaning Paragraph Located In The Welding Requirements Section Of The Contract 3.11 1.0 General 3.11.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.12 2.0 Definitions. 3.12.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.12.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.12.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.13 3.0 Scope 3.13.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.13.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: shipping And Storag ;583e001; P/n, ;6kh 8145 013574414; Nsn, ;ag-830ac-meb-000 Work Package 025 00; Tech Publications 3.13.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.14 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.14.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.14.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall be Read As The "government Designated Agency" 3.14.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.14.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.14.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.14.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.14.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.14.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.14.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.14.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item and Is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All units Determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco prior To Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.15 4.0 Parts And Materials 3.15.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And material Used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.15.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.15.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With the Requirements Of This Contract. 3.15.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.15.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.15.6 3.16 Source And Location Of Repair Source: 3.16.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. shipping And Storag ;tbd; Company Name , ;tbd; Address , ;tbd; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.17 5.0 Contractor Quality Requirements: 3.17.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.17.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.18 6.0 Configuration Management (cm): 3.18.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.19 7.0 Markings. 3.19.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.20 8.0 Storage; 3.20.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. 4. Quality Assurance 4.1 The Tests To Be Performed Under The First Article Approval Clause (far 52.209-4) Of The Contract Are Listed Below. 4.1.1 Dimensional Test (special) ;applies; 4.1.2 Requirements Of: ;to Drawing (05259) 583e001 And Sub-drawings As Applicable; 4.1.3 Form: ;applies; 4.1.4 Fit: ;applies; 4.1.5 Function ;applies; 4.1.6 Compliance With Drawing ( ;05259; ) ;583e001; , Revision ;latest; And Specifications Referenced Therein. 4.2 In Addition To The Above Tests, The First Article(s) To Be Delivered Hereunder Shall Also Be Subjected To Those Tests Which Will Demonstrate That The Article(s) Comply With Contract Requirements Requirements. 4.3 The Contractor Shall Be Responsible For Providing The Necessary Parts And Repair Of The First Article Sample(s) During Testing. 4.4 The Cost Of The Government Testing Effort Set Forth In This Solicitation Is Estimated To Be $ ;12000; For The First Article Testing. This Cost Factor Will Be Added, For Solicitation Purposes, To The Price Of All Offerors For Whom The Government Will require Such Testing. 4.5 Disposition Of Fat Samples 4.5.1 ;zero; Sample(s) Shall Not Be Returned To The Contractor Because They Shall Be Destroyed During Testing. 4.5.2 ;all; Unless Otherwise Provided For In The Contract, Sample(s) Shall Be Returned To The Contractor And May Be Considered As Production Items Under The Contract Provided The Sample(s) Can Be Refurbished To Ready For Issue Condition And Provided The sample(s) Have Inspection Approval From The Cognizant Dcmc Qar. Sample(s) May Be Shipped As Production Items Only After All Other Units Required Under The Contract Have Been Produced And Are Ready For Shipment. ;n/a; Sample(s) Shall Be Returned To The Contractor But Shall Not Be Considered As Production Due. 4.6 Test Sample Coating Instructions 4.6.1 Samples Are To Be Unpainted. Corrosive Areas Are To Be Coated With A Light Preservative.this Paragraph Does Not Apply To Shipping Containers. 4.7 Fat Approval Criteria 4.7.1 Far 52.209-4 Applies (a) The Contractors Shall Deliver ;one (1); ; Unit(s) Of The Following Cage ( ;05259; ; ) Part Number ;583e001; ; , Revision ;latest; ; Within ;120; ; Calendar Days From The Date Of This Contract To The Government At ;contact Buyer On Page 1 Of The Contract; ; marking Of Test Sample(s) Shipping Container Shall Be As Follows, Citing This Contract Number: "for First Article Testing. Not Rfi Material. Do Not Take Up In Stock Contract Number:____________" for First Article Test, The Shipping Documentation Shall Contain This Contract Number And Lot/item Identification. The Characteristics That The First Article Must Meet And The Testing Requirements Are Specified Elsewhere In This Contract. (b) Upon Shipment Of First Article Sample(s), Two (2) Copies Of The Material Inspection And Receiving Report (dd Form 250) Bearing The Qar's Signature And Indication Of Preliminary Inspection Shall Be Forwarded To The Navicp- Philadelphia Code Cited In Block 10.a Of Sf33, With Duplicate Copies To Navicp Code 072 And To The Designated Test Facility. The Envelopes Shall Be Clearly Marked: "do Not Open In Mail Room". within ;90; ; Days After Receipt Of The Samples, The Test Site Shall Complete Testing/evaluation And Submit Two (2) Copies Of Their Test Report With Conclusions And Recommendations To The Navicp Code Cited In Block 10.a Of The Sf33. (c) Within ;120; ; Calendar Days After The Government Receives The First Article, The Contracting Officer Shall Notify The Contractor, In Writing, Of The Approval, Conditional Approval, Or Disapproval Of The First Article. The Notice Of Approval, Conditional approval, Or Disapproval Shall Not Relieve The Contractor From Complying With All Requirements Of The Specifications And All Other Terms And Conditions Of This Contract. A Notice Of Conditional Approval Shall State Any Further Action Required Of The Contractor. a Notice Of Disapproval Shall Cite Reasons For Disapproval. (d) If The First Article Is Disapproved, The Contractor, Upon Government Request, Shall Submit An Additional First Article For Testing. After Each Request, The Contractor Shall Make Any Necessary Changes, Modifications, Or Repairs To The First Article Or select Another First Article For Testing. All Costs Related To These Tests Are To Be Borne By The Contractor, Including Any And All Costs For Additional Tests Following A Disapproval. The Contractor Shall Furnish Any Additional First Article To The government Under The Terms And Conditions And Within The Time Specified By The Government. The Government Shall Act On This First Article Within The Time Limit Specified In Paragraph (b) Above. The Government Reserves The Right To Require An Equitable adjustment Of The Contract Price For Any Extension Of The Delivery Schedule Or For Any Additional Costs To The Government Related To These Tests. (e) If The Contractor Fails To Deliver Any First Article On Time, Or The Contracting Officer Disapproves Any First Article, The Contractor Shall Be Deemed To Have Failed To Make Delivery Within The Meaning Of The Default Clause Of This Contract (f) Unless Otherwise Provided In The Contract, The Contractor - (1) May Deliver The Approved First Article As Part Of The Contract Quantity, Provided It Meets All Contract Requirements For Acceptance And Was Not Consumed Or Destroyed In Testing: And (2) Shall Remove And Dispose Of Any First Article From The Government Test Facility At The Contractors Expense. (g) If The Government Does Not Act Within The Time Specified In Paragraph (b) Or (c) Above The Contracting Officer Shall, Upon Timely Written Request From The Contractor, Equitably Adjust Under The Changes Clause Of This Contract The Delivery Or Performance dates And/or The Contract Price, And Any Other Contractual Term Affected By The Delay. (h) The Contractor Is Responsible For Providing Operating And Maintenance Instructions, Spare Parts Support, And Repair Of The First Article During Any First Article Test. (i) Before First Article Approval, The Acquisition Of Materials Or Components For, Or The Commencement Of Production Of, The Balance Of The Contract Quantity Is At The Sole Risk Of The Contractor. Before First Article Approval, The Costs Thereof Shall Not Be allocable To This Contract For (1) Progress Payments, Or (2) Termination Settlements If The Contract Is Terminated For The Convenience Of The Government (j) The Contractor Shall Produce Both The First Article And The Production Quantity At The Same Facility And Shall Submit A Certification To This Effect With Each First Article. (k) The Contractor Shall Provide Specific Written Notification To The Procuring Contracting Officer Informing Him/her Of The Shipment Of Any Article(s) Furnished In Accordance With This Clause. Such Notification Must Be Addressed To The Attention Of The navicp Code Specified In Block 10.a Of The Sf33, With Copies To Navicp Code 072 And To The Testing Activity. Failure To Provide Such Notification Shall Excuse The Government From Any Delay In Performing First Article Testing And Informing The Contractor Of the Results Thereof. (l) Fourteen (14) Days Prior To Shipment Of First Article Samples, The Contractor Shall Notify The Designated Test Facility In Writing Of The Anticipated Shipping Date, With An Information Copy To The Pco, Navicp Philadelphia, Attn: (cite Code Found In Block 10.a Of The Sf33). The Contractor Shall Also Arrange For Preliminary Inspection Of Test Samples By The Dcmc/qar. 4.8 Alternate Offers - Waiver Of First Article Approval Requirements. (the Following Provisions Supersede Any Waiver Of First Article Approval Requirements Terms Set Forth In Clause 52.209-3 Or 52.209-4 As Appropriate) (a) Unless Otherwise Specified In The Solicitation, The Naval Inventory Control Point Reserves The Right To Waive The First Article Approval Requirements Specified Herein For Offerors Who Have Previously Furnished Identical Production Articles Accepted By The government Or The Original Equipment Manufacturer/prime Manufacturer. An Offeror Requesting Waiver Of First Article Requirements Shall Submit Evidence With Its Offer Establishing That: (i) The Last Production Unit Was Delivered Within Three (3) Years Of The Issue Date Of This Solicitation, And (ii) The Production Location To Be Used For This Requirement Is The Same As Used For The Previous Production Run additionally, The Offeror Shall Submit A Certification, To Be Executed By The Officer Or Employee For The Offer, Stating That: (i) The Articles To Be Provided Will Be Produced Using The Same Facilities, Processes, Sequences Of Operations And Approved Subcontractors As Those Previously Delivered And Accepted By The Government Or The Original Equipment Manufacturer/prime Manufacturer, and (ii) The Previous Production Units Were Manufactured Without Material Review Board Disposition Or Waiver/deviation Request Or Rejection Of Pre-production Samples For Cause. (note: This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States And The Making Of A False, Fictitious, Or Fraudulent Certification May Render The Maker Subject To Prosecution Under Title 18, United States Code, Section 1001.) (b) Offerors Requesting Waiver Of First Article Approval Requirements Under The Provisions Of This Clause Are Cautioned To Submit Two Prices For Articles Required Herein - One That Is Based On Compliance With The First Article Approval Requirements And One that Is Based On A Waiver Of Such Requirements. Where An Offeror Submits Only One Price And Fails To Clearly State That The Price Is Based On Waiver Of The First Article Approval Requirements It Will Be Deemed To Be Based On Compliance With The First Article approval Requirements (c) In The Event Of The First Article Approval Requirement Is Granted, The Delivery Schedule For The Production Items Shall Be Reduced By The Number Of Days Designated For Delivery Of First Article Test Unit Plus The Number Of Calendar Days Indicated For The government Notification Of Conditional Approval Or Approval. These Requirements Are Specified In The Quality Assurance Section Of This Solicitation. If The Offeror Is Unable To Meet The Desired Schedule, He Shall Insert Below The Alternate Delivery Schedule he Offers To The Government. Offeror's Proposed Alternate Delivery Schedule (based On Waiver Of First Article Approval Requirements) within Days: item No. _______________ Quantity:_______ After Date Of Contract:__________ all Costs And Responsibilities Related To The First Article Test Submission Container Shipment To And From The First Article Test Facility Are To Be Borne By The Contractor 4.9 100% Production Leak Test. Each Container, Uninstrumented And Without Dummy Load, Shall Be Raised To A Height Of 18 Inches And Allowed To Fall Freely To A Concrete Or Similarly Hard Surface, Landing Flat On Its Base. The Container Shall Then Be Prepared for Testing By Sealing All Breathing Devices And Inserting Suitable Pressurized Fittings And Gauges. The Container Shall Be Closed And Sealed In A Normal Manner. The Pneumatic-pressure Technique Of Method 5009 Of Federal Test Method Standard No. 101c Shall Be used To Detect Leakage. An Initial Pressure Setting Equal To 1.0 + 0.1 - 0 Psig Shall Be Used. After Stabilization, Pressure Shall Be Monitored For Thirty Minutes. Any Loss In Pressure In Excess Of 0.05 Psig (adjusted For Changes In Temperature And Barometric pressure) Shall Be Cause For Rejection. Warning container May Explode Or Fasteners May Fail During Test. Use Protective Barriers To Avoid Injury To Personnel. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Closing Date18 Feb 2025
Tender AmountRefer Documents 
Description: Item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance - Short Version|8|x||x|||||| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report ? Certifications Combo ? Receiving Report & Invoice ? Material ||tbd|n00104|tbd|tbd|n50286|tbd|||n/a|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery||||| warranty Of Data--basic (mar 2014)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|332919|750|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| this Amendment Is Being Issued To Incorporate A New Tdp Version As Paragraph 3.2 Has Been Updated. all Previous Quotes That Were Submitted Are No Longer Valid. the Solicitation Closing Date Is Hereby Extended To 18 February 2024. \ the Closing Date Is Extended To 04 February 2025. 1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg. 2.drawings Can Be Accessed Thru: Beta.sam.gov. 3.navsup Wss Mech Will Be Considering Past Performance In The Evaluation Of Offers. See Clause 252.213-7000. 4.portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference To N00102 Within This Order Should Be Updated To N50286. 5.all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, End Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By facsimile, Or Sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To "issue" Contractual Documents Asdetailed Here In. 6.the Following Proposed Delivery Schedule Applies: submission Of All Certification Data Cdrls 20 Days Prior To Delivery. pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt final Delivery Of Material (300 Days) \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.2.3 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. drawing Data=eb-2000 |96169| C|sp |d|0001 | C|49998|0484385 drawing Data=4384678 |80064| C| |d|0001 | C|49998|1136401 drawing Data=4385049 |53711| D| |d|0001 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0002 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0003 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0004 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0005 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0006 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0007 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0008 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0009 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0010 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0011 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0012 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0013 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0014 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0015 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0016 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0017 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0018 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0019 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0020 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0021 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0022 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0023 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0024 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0025 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0026 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0027 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0028 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0029 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0030 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0031 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0032 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0033 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0034 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0035 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0036 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0037 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0038 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0039 | D|00026|0000000 drawing Data=4385049 |53711| D| |d|0040 | D|00026|0000000 document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | 3. Requirements 3.1 ;seats For A Size 8-inch Ball Valve To Be In Accordance With Naval Ship Systems Command Drawing 4385049 Piece 3 Along With Naval Ship Systems Command General Notes Drawing 4384678, Except As Amplified Or Modified Herein.; 3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;seats (q3), Piece 3; material - Mc903 (type 6 Cast Nylon Produced With Polyepsilon Caprolactam By The Direct Polymerization Process) As Manufactured By The Polymer Corporation Or Equal In Accordance With Electric Boat Division Specification 2000. (properties Specified Below Only) item Property Test Method Value (a) Melting Point Astm E794 Or Astm D3418 221 Deg C +/- 9 (b) Relative Viscosity Astm D789 (notes 1 And 4) 2000 Minimum (c) Specific Gravity Astm D792 1.15-1.17 At 23 Deg C (d) Dimensional Change Notes 2 & 4 0.2% Maximum (e) Tensile Impact Astm D1822 Type S 80 Ft-lbs/in�2 Specimen (notes 5 & 6) Minimum (note 3) (f) Tensile Yield Stress Astm D638 (note 6) 9000 Psi Min. (note 3) (g) Compressive Strength^ Astm D695 (note 6) 9000 Psi Min. (note 3) ^(at 1 Percent Offset) (h) Water Absorption 24 Hour Astm D570 1.3 Percent Maximum Saturation Astm D570 7.0 Percent Maximum (i) Rockwell "m" Hardness Astm D785 75 Minimum note 1: The Test Specimen Must Be Finely Ground Particulates. After Immersion The Material Must Be Checked Daily For Dissolution And Must Dissolve No Longer Than One Hundred Twenty (120) Hours From The Start Of Immersion. Within Twenty-four (24) Hours Of The test Specimen Determined To Be Fully Dissolved, It Must Be Tested For Viscosity. note 2: Dimensional Stability Testing Must Be Performed In Accordance With The Dimensional Stability Method Per Astm D5989 Or Equivalent. The Percent Change In Each Dimension, Outside Diameter, Inside Diameter And Thickness Must Not Be Greater Than The Value specified. note 3: These Values Are Minimum Averages. Separate Specimens Results May Vary By 25%. note 4: Any Change To An Already Established Heat Or Annealing Cycle To Achieve Both Relative Viscosity And/or Dimensional Stability Must Be Presented To The Procuring Activity For Approval Along With Justification For The Change. note 5: Tensile-impact Test Specimens Are To Be Type S In Accordance With Astm D1822, Or Round Cylindrical Specimens In Accordance With Mil-dtl-32286, Paragraph 3.8 note 6: Prior To Test, The Specimens Must Be Dried In Accordance With Federal Specification L-p- 410a, Paragraph 4.4.5. 3.3 Seat Stack Height Measurement - To Ensure That Each Seat Is Within Tolerance, Check Each Seat Singularly By Measuring The Seat Height Over The Ball. This Measurement Is Calculated By Adding One-half Ball Diameter To The Half Stack Height Dimension On The drawing. Limits Are Determined By The Ball Diameter Tolerance And The Half Stack Height Tolerance. Check Dimensions By Measuring From The Seat Back Face To Top Of Ball. Manufacturers Of Seats That Do Not Have A Ball Of The Required Size Available Will Be required To Manufacture A Dummy Ball Or Segment Of A Ball With Sufficient Spherical Surface To Check The Above Dimension. 3.4 A Visual Inspection Shall Be Performed On The Finished Seat With Acceptance Criteria On Critical Surfaces Per Csd167 In The Ecds (electronic Contractor Data Submission) System At: Https://register.nslc.navy.mil/. 3.5 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.5.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.5.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.5.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.6 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.7 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. 3.8 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.8.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. ^ Quality Assurance Requirements ^ 3.9 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System 3.9.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.9.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.9.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.9.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.9.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.10 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved and Rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.10.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.10.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.11 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Command (dcmc) Office. In The Event That A Local Government Representative Or Dcmc Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.11.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.11.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.11.3 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.11.4 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must be Established. Records Of This Effort Must Be Available For Review By The Government. 3.11.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.12 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.12.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.12.2 Inspection For Completeness And Proper Type. 3.12.3 Verification Of Material Quality Received. 3.12.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.12.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.12.6 Identification And Protection From Improper Use Or Disposition. 3.12.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.12.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.12.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.13 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.13.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That Implement The Material control Requirements Stated Herein, And Elsewhere In This Contract/purchase Order. 3.14 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Batch Of Non-metallic Material, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.14.1 Material Marking - Each Seat Must Be Permanently Marked In Accordance With Mil-std-792, Type I And As Stated Below, Except For Teflon Seats, Which Must Only Be Tagged. Type Ix Marking May Be Substituted For Type I, Provided The Minimum Character Size scribed By The Marking Tool Must Be Approximately 3/32 Inch High To Insure Legibility. Permanent Marking Is Not Permitted On Teflon Seats. When Permanent Marking Is Required, It Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And function Of The Material. ;seats To Be Marked On The Outer Cylindrical Surface.; seat Marking Requirements Must Maintain Complete Traceability To Certification Oqe. Seat Marking Must Be Either Heat/lot Or Batch Number, A Vendor Traceability Number/code, Or A Combination Thereof And Must Be Unique To The Material Certification. 3.15 See Cdrl Di-misc-80678 (seat Material) - Material Certification - The Contractor Must Furnish The Applicable Test Reports For Each Heat/lot/batch Of Seat Material. Material Certification Test Reports Must Include, In Addition To The Specification, The class, Form, Grade, Type, Process, And/or Composition, As Applicable, Of The Material Supplied. 3.16 Material Handling - The Written Material Control Process Must Include The Following: 3.16.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.16.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.16.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Batches Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.16.4 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Codes That Are Marked On The Material And Identified On The Test Reports. The Certification Data Requirements Herein must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.16.5 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.17 Receiving Inspection - 3.17.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.17.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Number Marked On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.18 Discrepancy Reporting - 3.18.1 Nonconforming Products Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To The Responsible Sub-tier supplier In Accordance With Established Procedures. Nonconforming Material Records Will Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.19 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.19.1 Sampling For Certification Must Be On The Basis Of One Set Of Test Specimens From Each Heat/lot Or Batch. 3.20 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification. 6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order. ;- 10/20/2016 - Updated Ecds Url - Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds - Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe - Dec 17 2011 - Moved Quality Assurance Text Location For Readability - Jan 19 2011 - Added Notification Of Dcma Upon Contract Award - Mar 22 2011 - Added Traceability Requirements For Non-metallic Seats - Jul 02 2013 - Allowed Ball Valve Seats To Be Marked Using Mil-std-792 Type Ix In Addition To Type I - May 02 2009 - Added Lubricants And Sealants To The C Of C - Aug 27 2014 - Took Out Contractor's Phone Number Requirement - Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section - Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section; date Of First Submission=asreq paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance.

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Closing Date21 Feb 2025
Tender AmountRefer Documents 
Details: Item Unique Identification And Valuation (jan 2023)|19|n792.06|s8r|215-697-0275|patrick.j.horan23.civ@us.navy.mil|||||||||||||||| higher-level Contract Quality Requirement|8|x|||||||| inspection And Acceptance Of Supplies|26|x||||||||||||x|||||||||||||| time Of Delivery (june 1997)|20||||||||||||||||||||| stop-work Order (aug 1989)|1|| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo Type ||tbd|n00383|tbd|tbd|see Schedule|tbd||||||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| integrity Of Unit Prices (nov 2021)|1|| warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|12 Months|60 Days After Discovery Of Defect||||| safeguarding Sensitive Conventional Arms, Ammunition, And Explosives (nov 2023)|9|||||||||| equal Opportuity For Workers With Disabilities (jun 2020)|2||| transportation Of Supplies By Sea (jan 2023)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|332439|600||||||||||| type Of Contract (apr 1984)|1|| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x| interested Vendors Should Submit A Tiered Pricing Repair Proposal. please Submit An Evaluation Price As Well As Pricing For Minor, Moderate, And Major Repair Tiers. \ the Following Language Is Hereby Added To The Solicitation Notes: repair Turnaround Time (rtat) Definition: The Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. the Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In The Subsequent Contract. required Rtat: ## 111 Days After Receipt Of Asset throughput Constraint: Contractor Must Provide A Throughput Constraint For Each Nsn(s). Total Assets To Be Repaired Monthly After Initial Delivery Commences X/month (contractor Fill In #). A Throughput Of ##____ Per Month Reflects No Throughput Constraint. Induction Expiration Date: 365 Days After Contract Award Date. Any Asset Received After This Date In Days Is Not Authorized For Repair Without Bi-lateral Agreement Between The Contractor And Navsup Wss contracting Officer. reconciliation:a Reconciliation Modification Will Be Issued After Final Inspection And Acceptance Of All Assets Inducted Under The Subsequent Contract. The Parties Have Agreed To A Price (shown On The Schedule Page) For Each Unit At The Negotiated Rtat. Such prices Are Based On The Contractor Meeting The Rtat Requirements Described Within The Schedule Page. If The Contractor Does Not Meet The Applicable Rtat Requirement, Consideration Will Be Assessed And Subject To Negotiation. \ the Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. In Addition To Price, The Following non-price Evaluation Factor Shall Be Used To Evaluate Offers And Are Listed In Descending Order Of Importance. relevant Past Performance technical Capability the Non-price Evaluation Factors, When Combined, Are Significantly More Important Than Price. There Are No Subfactors. the Government Reserves The Right To Obtain Information For Use In The Evaluation Of Past Performance From Any And All Sources Including Sources Outside Of The Government. Offerors Lacking Relevant Past Performance History Will Not Be Evaluated Favorably Or unfavorably On Past Performance. The Government Will Consider The Quality Of An Offeror's Relevant Past Performance. This Consideration Is Separate And Distinct From The Contracting Officer's Responsibility Determination. The Assessment Of The Offeror's R relevant Past Performance Will Be Used As A Means Of Evaluating The Relative Risk Of The Offeror And Other Competitors In Successfully Meet The Requirements Of The Rfp. In Determining The Rating For The Past Performance Evaluation Factor, The Government Will Give Greater Consideration To The Contracts Which The Government Feels Are Most Relevant To The Rfp. the Government Reserves The Right To Award The Contract To Other Than The Lowest Priced Offeror. page Limitation-excluding The Cover Page, Table Of Contents, Past Performance Project Forms The Technical Capability Proposal Is Limited To Fifteen (25) Pages In At Least 11pt. Font And 1" Margins. Pages In Excess Of This Limitation Will Not Be Evaluated. The pages Excluded From Evaluation Will Be At The Discretion Of The Agency. contractors Are Informed That It Is The Government's Desire To Make Award On Initial Proposals When Deemed Possible By The Contracting Officer, However The Government Reserves The Right To Communicate And/or Negotiate With Offerors If Later Determined Necessary. none Price Proposal (all Non-price Factors) -the Contractor Is Required To Submit The Following Non-price Information: 1. Relevant Past Performance: the Contractor Is Provided An Opportunity To Demonstrate Relevant Past Performance On Contracts Currently Being Performed Or Performed Within The Past Three (3) Years. The Government Will Determine Relevance By Analyzing The Scope And Magnitude Of The Reference contracts And Comparing Them To The Instant Requirement. The Government Reserves The Right To Evaluate Submitted Projects Individually Or In The Aggregate In Order To Determine Relevance And Will Do So Consistently Across All Evaluated Offers. The Government will Consider The Quality Of The Contractor's Relevant Past Performance. reference Contracts: A. The Contractor May Submit Up To A Maximum Of Three (3) Contracts For Evaluation. The Government Reserves The Right To Obtain Information From Sources Other Than Those Identified By The Contractor. 2. Technical Capability the Government Desires That Offerors Demonstrate Technical Capability To Satisfy The Government's Requirements. The Offeror's Response Will Be Evaluated To Determine Whether Its Response Poses Risk To Performance Or Whether It Will Result In Better Value To The government. In Response To This Evaluation Factor, Offerors Shall Address Its Manufacturing Equipment; Inspection Method Sheets; Incoming Inspection Sheets; Process Sheets; Quality System Compliance; Welding Certification. in Responding To The Above Areas Of The Technical Capability Factor, It Is Incumbent Upon The Offeror Provide A Level Of Detail The Demonstrates To The Government's Satisfaction That The Offeror Has The Technical Capability To Perform The Requirement. If The proposal Lacks Sufficient Detail, It May Result In The Government Assessing Risk In The Proposal. While There Is No Prescribed Method For Demonstrating Technical Capability, The Below Are Items Of Interest To The Government That The Contractor May, At Its discretion, Address To Assist The Government In Gaining An Understanding Of The Offerors Technical Capability. Offerors Are Cautioned That While These Areas Of Interest Are Not Mandatory Elements That Are Required To Be Addressed, Failure To Address Them Or comparable Indicia Of Technical Capability, May Limit The Government's Understanding Of Technical Risk And Result In The Assignment Of Commensurate Risk. Offerors Are Also Notified That Some Of These Indicia Of Capability Are Overlapping, I.e., Two Or More May evidence The Same Facet Of Capability. certification Of Possession Or Access To The Following Equipment:for Aluminum And Steel Welded Containers, & Bladebox/riveted Construction 1.brake Press 2.extrusion Dies 3.cnc Machining Center(s) Capable Of Lathe And/or Milling Operations copies Of Inspection Method Sheets Used In-process And/or At Final Inspection copies Of Incoming Inspection Documents That Show Material Certificates Of Conformance, And If Applicable, Dimensional Conformance process/operation Sheets To Show Ability To Conform To Drawing Requirements In The Following Areas: Weld Preparation; Welding Procedure Specifications Production Lot Testing proof Of Compliance To Iso9001, And/or, As9100. applicable Up-to-date Welder Certifications Showing Highest-level Certification Obtained Aws D1.1 For Steel, Aws D1.2 Or Mil-w-22248,class 4 For Aluminum, Aws D1.3 For Sheet Steel And Aws D1.6 For Stainless Steel. if The Offeror Address Any Or All Of The Above, Or Provides Comparable Indicia Of Capability, It Is Encouraged To Provide Supporting Evidence And Detail, Such As But Not Limited To Receipts, Certifications, Drawings, Test Results/ Logs, Maintenance Records, calibration Records, Inspection Reports, Audits, Etc. The Weigh Accorded To Supporting Evidence Will Be At The Discretion Of The Government. the Technical Capability Proposals Will Be Evaluated To Determine The Risk Of Unsuccessful Performance As Well As Relative Risk Compared To Other Offerors. navsup Wss Has Been Granted A Class Deviation (cl-00-203) That Permits Us To Use The Award Forms Currently Available In Our Automated Procurement System Instead Of The Sf 1449 When Conducting Procurements For Commercial Items. this Procurement Is Being Conducted In Accordance With Far Part 12, Acquisition Of Commercial Products. information Appearing On The Face Of The Dd Form 1155 Or Sf 26 That Conflicts With Clauses Or Provisions Contained Elsewhere In This Solicitation Shall Be Disregarded. addendum To Far 52.212-4 Contract Terms And Conditions Commercial Products Under Paragraph(a) "inspection And Acceptance" Add The Following: 1. Far Clause 52.246-2 Inspection Of Supplies-fixed Price Applies As Amended Herein. All Product Audits Performed At The Discretion Of The Dcma Qar Shall Be Conducted By Witnessing Contractor Inspections Or Tests On A Non-interference Basis. 2. The Contractor Shall Maintain A Quality System That Addresses The Elements Of Iso9001-2000/as9100b, Quality System Model For Quality Assurance In Design/development, Production, Installation And Servicing, And A Calibration System That Addresses The Elements Of Iso-10012-1, Ansi/ncsl Z540 Or An Equivalent Program Approved By The Navy. 3. The Government Reserves The Right To Assess The Contractor's Compliance To Its Documented Quality System Throughout The Performance Of This Contract. The Quality System Procedures, Planning, And All Other Documentation, Media, And Data Which Comprise The quality System Shall Be Made Available To The Government For Their Review And Use. The Acceptance Of Non-conforming Supplies Is A Prerogative Of And Shall Be As Prescribed By The Government. The Government Reserves The Right To Disapprove The Quality System Or portions There Of When It Fails To Meet Its Intended Objectives. 4. The Contractor Shall Not Make Any Configuration Changes, Engineering Changes Or Part Number Changes To The Contract/purchase Order Items, Including, But Not Limited To, The Item's Hardware, Software Or Firmware, Unless Approved By The Procurement Contracting officer (pco). In Addition, Approval By The Appropriate Technical Authority May Also Be Required. Guidance On How To Submit A Proposed Engineering Or Part Number Change May Be Obtained From The Pco. 5. The Contractor Shall Not Manufacture Any Item For Acceptance By The Government That Incorporates A Known Departure From Technical Or Contractual Requirements Unless A Request For A Deviation Has Been Approved. Authorized Deviations Are A Temporary Departure from The Requirements Only And Do Not Authorize A Change To The Item's Configuration Baseline. Any Deviation, Major Or Minor, Must Be Approved By The Pco Prior To Acceptance. all Contractual Documents (i.e. Contracts, Purchase Orders, Task Ordersdelivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein. early And Incremental Deliveries Accepted And Preferred. \ 1. Scope 1.1 Articles To Be Furnished Hereunder Shall Be Repaired, Tested And Inspected In Accordance With The Terms And Conditions Specified In The Requirements Section Of This Document. 1.1.1 Any Item Contracted For Repair Shall Have A Statement Of Work To Ensure Compliance With All Repair Procedures And Requirements. repair Of: shipping And Storag ;8145-01-437-5024; Nsn , ;21c14061g01; Part Number, Shall Be Performed Iaw: Shipping And Storag ;ag-830ac-meb-000 Work Package 039 00; Publication (s). 1.1.2 There Will Be No Repair Deviation From The Approved Written Procedures Without Review And Acceptance By The Basic Design Engineer. All Requests For Waiver/deviation Shall Be Via Form 1694 Routed Throught The Local Dcma/aco Office For Review And recommendations Via Form 1998. 1.2 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With � See Schdule/line Item�,and All Details And Specifications Referenced Therein. 1.3 When Discrepancies Exist Between These Requirements And Those On Current manufacturer's Drawings,contact Code ;contact Buyer On Page 1 Of The Contract; Or Code N241.10 1.4 Pre-award / Post Award Requirements: due To The Critical Use Of This Item And Its Quality History, A Pre-award Survey And Post-award Conference May Be Required For All New Manufacturers. For All Previous Sources, A Post-award Conference May Be Recommended. 1.5 Container Shell Material Is ;aluminum; . container Shall Include Revision R And S. Revision R & S May Be Provided By The Government As An Email Or Dod Safe Transfer. Revision R & S May Not Be The Latest Revision, Check With N241.12 For Latest Revision. when Discrepancies Exist Between These Requirements And Those On Current Manufacturer's Drawings, Contact Buyer Found On Page One Block Five Of The Contract. Until Drawings Have Been Updated Current Cid Changes Apply. 2. Applicable Documents - Not Applicable 3. Requirements 3.1 1.0 General 3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable condition. 3.2 2.0 Definitions. 3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order. 3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled). 3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired). 3.3 3.0 Scope 3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property, including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items. 3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition: shipping And Storag ;21c14061g01; P/n, ;8145-01-437-5024; Nsn, ;ag-830ac-meb-000 Work Package 039 00; Tech Publications 3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow. repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s). 3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change. 3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility. 3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be read As The "government Designated Agency" 3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test. 3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements. 3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather, repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract. 3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra). 3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either: 3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work. 3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section 6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed. 3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior to Undertaking Repair Of The Item. after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations and Dcma Disposal Procedures And Requirements. 3.5 4.0 Parts And Materials 3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein. authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And requires Specific Approval By The Pco. 3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility. 3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The requirements Of This Contract. 3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With appropriate Pass/fail Criteria Such As Certifications and Actual Dimensonal Readings. 3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde. 3.5.6 3.6 Source And Location Of Repair Source: 3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed. shipping And Storag ;general Electric Co.; Company Name , ;1 Neuman Way Cincinnati Ohio; Address , ;66464; Cage Code inspection Will Be Accomplished On The Contractor's Equipment 3.7 5.0 Contractor Quality Requirements: 3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality. 3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government. 3.8 6.0 Configuration Management (cm): 3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract). 3.9 7.0 Markings. 3.9.1 Marking Shall Be As Indicated In The Contract When Applicable. 3.10 8.0 Storage; 3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored. 3.11 One Third (1/3) Unit Of Desiccant (mil-d-3464, Type Ii Nondusting) Per Cubic Foot Of Container Interior Volume Shall Be Placed In Desiccant Holder Of Each Container At Time Of Shipment. 3.12 At Faying Surfaces, Discontinuous Welds, Or Other Areas Where Atmospheric Liquids May Be Retained By Capillary Action, The Crevice Shall Be Sealed Using Sealing Compound Mil-s-81733 Or Equivalent. 3.13 Reference To Cadmium Plating Shall Be Deleted And The Following Substituted: "finish Shall Be Electrodeposited Alkaline Zinc-nickel Alloy In Accordance With Astm B 841 Class 1, Type B, Grade 3." 3.14 The Shock Mount Listed In The Drawing Package (whether Identified As Sole Source, Recommended, Or Suggested) Has Been Tested And Approved For The Shock Mitigation System Of This Container. No Other Shock Mount May Be Substituted Without Written Permission of Naval Inventory Control Point, Philadelphia Unless An Alternate Is Specifically Indentified In This Contract. ;no Other Shock Mount Approved; Is An Approved Alternate Mount. all Containers Must Be Affixed With A Nameplate That Includes A unique Identification (uid) Marking As Referenced In The Drawing Package drawing ;(80132) 15930; And Iaw Mil-std-130 Latest Revision. The Contractor shall Contact Navicp Code ;contact Buyer On Page 1; Or Code 0771.10 For The Alphanumeric sequential Serial Number Group That Makes Up Part Of The Uid. the Uidwill Be Included On The Nameplate In Data Matrix Format. 3.15 Welding And Welder Qualifications Shall Be In Accordance With Aws D1.1 for Steel, Aws D1.2 Or Mil-w-22248,class 4 For Aluminum, Aws D1.3 for Sheet Steel And Aws D1.6 For Stainless Steel. Proper Controls Shall Be Used To Prevent Melt Through Or Burn Through. For Aluminum, Filler For Welding 6061 Alloy Shall Be 4043: Filler For Welding 5000 Series Alloys to Themselves Or To 6061 Shall Be 5356 Or 5556. In Addition,welding And weld Inspection Shall Include: (1) Visual Inspection Shall Include 5x (5power) Magnification When A Suspect condition Is To Be Examined Beyond The Capability Of Normal Vision. (2) Critical And Major Welds May Be Subjected To Further Non Destructive testing (such As Dye Penetrant Inspection)as Prescribed By The Buying Activity. (3) Proper Documentation Shall Be Available For Review By Government Personnel. 3.16 Work Instructions. Work Instructions Shall Be Posted At Theoperator's Work Station Giving Procedures To Control The Welding Process, I.e., Filler Material, Weld Size, Electrical And Gas Characteristics, Including Flow Rate. 3.17 Materials And Materials Control. The Quality Program Shall Assure That The Materials Used In Fabrication Or Processing, I.e., Base Metals And Weld Filler Material, Be Inspected And Conform To The Applicable Physical, Chemical And Other Technical requirements (supplier's Certification Is Sufficient). 3.18 Controls. Weld Filler Materials Shall Be Clearly Identified And Segregated From Each Other Both When In Storage And At The Work Station. Work Station Environment Shall Be Controlled To Prevent Conditions Adverse To Proper Gas Shielding. 3.19 Cleaning. Parts To Be Welded Shall Be Cleaned To Remove Surface Soils Such As Oils, Waxes, Grease, Inks, Etc. Except That Uninhibited Alkaline Solutions Such As Sodium Hydroxide Shall Not Be Used. 3.20 Deoxidizing. The Cleaned Parts Shall Be Chemically Deoxidized No More Than 10 Days Prior To Welding To Remove Thick Surface Oxide Films. (if The Material Or Work Is Exposed To An Outdoor Environment, This Time Limit Shall Be Reduced To A Maximum Of 3 days, To Account For Atmospheric Effects.) Mechanical Cleaning Methods Shall Be Applied Just Prior To The Actual Start Of Welding, To Remove Any Reoxidation Or Residual Thin Oxide Films. 3.20.1 Chemical Treatment. An Acid Deoxidizing Treatment Shall Be Applied By Either Immersion Or Brushing/wiping. Deoxidizers Acceptable For Use Shall Include Nitric Acid, Sulfuric Chromic, Phosphoric Chromic, Or Equivalent Solutions. Sodium Hydroxide solutions Shall Not Be Used. Care Shall Be Taken To Assure 100% Solution Coverage Of The Area To Be Welded. To Allow An Adequately Sized Deoxidized Area For Good Welding, The Solution Shall Be Applied To An Area Extending At Least 2 Inches From The Weld Site, or Ending At Any Closer Adjacent Edge. 3.20.2 Mechanical Means. Immediately Prior To Welding, Mechanical Cleaning Methods Shall Be Applied To The Weld Areas Previously Chemically Treated To Assure Removal Of Residual Or Reformed Oxides, If Any. Acceptable Methods Of Mechanical Cleaning Include stainless Steel Wire Brushing, Scraping, Filing, Or Sanding. However, Abrasives Containing Iron And Its Oxides, Steel Wool And Wire, And Copper Alloy Based Wire, Which May Become Embedded With Galvanically Active Metals And Accelerate Corrosion Of Aluminum alloys Shall Not Be Used. Mechanical Methods Shall Be Vigorous Enough To Adequately Remove Any Residual Oxide Films, But Gentle Enough To Avoid Forming An Excessively Rough Surface In The Comparatively Soft Metal Underneath. 3.21 Surface Finishing. All Containers Shall Be Glass Bead Blasted On Exterior Surfaces Only To Provide A Uniform Matte Finish That Will Hide Minor Surface Imperfections, Such As Scratches, Weld Irregularities, Etc. Size #8 Glass Beads Per Mil-g-9954 Shall Be used With Direct Air Pressure Ranging From 50 To 70 Psig. A Separator Shall Be Used To Provide A Reclaim Efficiency Of 90%, I.e., A Minimum Of 90% By Weight Of The Original Sized Material Shall Be In The Reclaim. The Glass Bead Media Shall Be Maintained In A condition Free From Contamination With Other Metals, I.e., The Media Shall Not Have Been Used To Blast Equipment Containing Other Metals Or Alloys. contact Code ;contact Buyer On Page 1 Of Contract; Or Code N241.10 To Arrange For First Article Test Location welding And Welder Qualifications Shall Meet Current Aws D1.2 Standards. additionally, Cleaning Preperations Shall Be In Accordance With Mil-c-5541 and The Cleaning Paragraph Located In The Welding Requirements Section Of The Contract when A First Article Is Required, The Contractor Shall Submit A Paper Copy Of The Drawings (size 11" X 17"), Contracts And Approved Ecp's Eco's, Deviations Waivers, And Modifications In The Records Recepticle Or Inside The Container Submitted For The First article. 4. Quality Assurance 4.1 The Tests To Be Performed Under The First Article Approval Clause (far 52.209-4) Of The Contract Are Listed Below. 4.1.1 Dimensional Test (special) ;to Drawing (66464) 21c14061g01 And Sub Drawings Applicable; 4.1.2 Requirements Of: ;to Drawing (66464) 21c14061g01 And Sub Drawings Applicable; 4.1.3 Form: ;applies; 4.1.4 Fit: ;applies; 4.1.5 Function ;per 100% Production Leak Test; 4.1.6 Compliance With Drawing ( ;(66464); ) ;21c14061g01; , Revision ;latest; And Specifications Referenced Therein. 4.2 In Addition To The Above Tests, The First Article(s) To Be Delivered Hereunder Shall Also Be Subjected To Those Tests Which Will Demonstrate That The Article(s) Comply With Contract Requirements Requirements. 4.3 The Contractor Shall Be Responsible For Providing The Necessary Parts And Repair Of The First Article Sample(s) During Testing. 4.4 The Cost Of The Government Testing Effort Set Forth In This Solicitation Is Estimated To Be $ ;12k; For The First Article Testing. This Cost Factor Will Be Added, For Solicitation Purposes, To The Price Of All Offerors For Whom The Government Will Require such Testing. 4.5 Disposition Of Fat Samples 4.5.1 ;zero; Sample(s) Shall Not Be Returned To The Contractor Because They Shall Be Destroyed During Testing. 4.5.2 ;all; Unless Otherwise Provided For In The Contract, Sample(s) Shall Be Returned To The Contractor And May Be Considered As Production Items Under The Contract Provided The Sample(s) Can Be Refurbished To Ready For Issue Condition And Provided The sample(s) Have Inspection Approval From The Cognizant Dcmc Qar. Sample(s) May Be Shipped As Production Items Only After All Other Units Required Under The Contract Have Been Produced And Are Ready For Shipment. ;n/a; Sample(s) Shall Be Returned To The Contractor But Shall Not Be Considered As Production Due. 4.6 Test Sample Coating Instructions 4.6.1 Samples Are To Be Unpainted. Corrosive Areas Are To Be Coated With A Light Preservative.this Paragraph Does Not Apply To Shipping Containers. 4.7 Fat Approval Criteria 4.7.1 Far 52.209-4 Applies (a) The Contractors Shall Deliver ;one(1); ; Unit(s) Of The Following Cage ( ;(66464); ; ) Part Number ;21c14061g01; ; , Revision ;latest; ; Within ;120; ; Calendar Days From The Date Of This Contract To The Government At ; Test Facility Addresses Naval Air Warfare Center Aircraft Division; ; marking Of Test Sample(s) Shipping Container Shall Be As Follows, Citing This Contract Number: "for First Article Testing. Not Rfi Material. Do Not Take Up In Stock Contract Number:____________" for First Article Test, The Shipping Documentation Shall Contain This Contract Number And Lot/item Identification. The Characteristics That The First Article Must Meet And The Testing Requirements Are Specified Elsewhere In This Contract. (b) Upon Shipment Of First Article Sample(s), Two (2) Copies Of The Material Inspection And Receiving Report (dd Form 250) Bearing The Qar's Signature And Indication Of Preliminary Inspection Shall Be Forwarded To The Navicp- Philadelphia Code Cited In Block 10.a Of Sf33, With Duplicate Copies To Navicp Code 072 And To The Designated Test Facility. The Envelopes Shall Be Clearly Marked: "do Not Open In Mail Room". within ;90; ; Days After Receipt Of The Samples, The Test Site Shall Complete Testing/evaluation And Submit Two (2) Copies Of Their Test Report With Conclusions And Recommendations To The Navicp Code Cited In Block 10.a Of The Sf33. (c) Within ;90; ; Calendar Days After The Government Receives The First Article, The Contracting Officer Shall Notify The Contractor, In Writing, Of The Approval, Conditional Approval, Or Disapproval Of The First Article. The Notice Of Approval, Conditional approval, Or Disapproval Shall Not Relieve The Contractor From Complying With All Requirements Of The Specifications And All Other Terms And Conditions Of This Contract. A Notice Of Conditional Approval Shall State Any Further Action Required Of The Contractor. a Notice Of Disapproval Shall Cite Reasons For Disapproval. (d) If The First Article Is Disapproved, The Contractor, Upon Government Request, Shall Submit An Additional First Article For Testing. After Each Request, The Contractor Shall Make Any Necessary Changes, Modifications, Or Repairs To The First Article Or select Another First Article For Testing. All Costs Related To These Tests Are To Be Borne By The Contractor, Including Any And All Costs For Additional Tests Following A Disapproval. The Contractor Shall Furnish Any Additional First Article To The government Under The Terms And Conditions And Within The Time Specified By The Government. The Government Shall Act On This First Article Within The Time Limit Specified In Paragraph (b) Above. The Government Reserves The Right To Require An Equitable adjustment Of The Contract Price For Any Extension Of The Delivery Schedule Or For Any Additional Costs To The Government Related To These Tests. (e) If The Contractor Fails To Deliver Any First Article On Time, Or The Contracting Officer Disapproves Any First Article, The Contractor Shall Be Deemed To Have Failed To Make Delivery Within The Meaning Of The Default Clause Of This Contract (f) Unless Otherwise Provided In The Contract, The Contractor - (1) May Deliver The Approved First Article As Part Of The Contract Quantity, Provided It Meets All Contract Requirements For Acceptance And Was Not Consumed Or Destroyed In Testing: And (2) Shall Remove And Dispose Of Any First Article From The Government Test Facility At The Contractors Expense. (g) If The Government Does Not Act Within The Time Specified In Paragraph (b) Or (c) Above The Contracting Officer Shall, Upon Timely Written Request From The Contractor, Equitably Adjust Under The Changes Clause Of This Contract The Delivery Or Performance dates And/or The Contract Price, And Any Other Contractual Term Affected By The Delay. (h) The Contractor Is Responsible For Providing Operating And Maintenance Instructions, Spare Parts Support, And Repair Of The First Article During Any First Article Test. (i) Before First Article Approval, The Acquisition Of Materials Or Components For, Or The Commencement Of Production Of, The Balance Of The Contract Quantity Is At The Sole Risk Of The Contractor. Before First Article Approval, The Costs Thereof Shall Not Be allocable To This Contract For (1) Progress Payments, Or (2) Termination Settlements If The Contract Is Terminated For The Convenience Of The Government (j) The Contractor Shall Produce Both The First Article And The Production Quantity At The Same Facility And Shall Submit A Certification To This Effect With Each First Article. (k) The Contractor Shall Provide Specific Written Notification To The Procuring Contracting Officer Informing Him/her Of The Shipment Of Any Article(s) Furnished In Accordance With This Clause. Such Notification Must Be Addressed To The Attention Of The navicp Code Specified In Block 10.a Of The Sf33, With Copies To Navicp Code 072 And To The Testing Activity. Failure To Provide Such Notification Shall Excuse The Government From Any Delay In Performing First Article Testing And Informing The Contractor Of the Results Thereof. (l) Fourteen (14) Days Prior To Shipment Of First Article Samples, The Contractor Shall Notify The Designated Test Facility In Writing Of The Anticipated Shipping Date, With An Information Copy To The Pco, Navicp Philadelphia, Attn: (cite Code Found In Block 10.a Of The Sf33). The Contractor Shall Also Arrange For Preliminary Inspection Of Test Samples By The Dcmc/qar. 4.8 Alternate Offers - Waiver Of First Article Approval Requirements. (the Following Provisions Supersede Any Waiver Of First Article Approval Requirements Terms Set Forth In Clause 52.209-3 Or 52.209-4 As Appropriate) (a) Unless Otherwise Specified In The Solicitation, The Naval Inventory Control Point Reserves The Right To Waive The First Article Approval Requirements Specified Herein For Offerors Who Have Previously Furnished Identical Production Articles Accepted By The government Or The Original Equipment Manufacturer/prime Manufacturer. An Offeror Requesting Waiver Of First Article Requirements Shall Submit Evidence With Its Offer Establishing That: (i) The Last Production Unit Was Delivered Within Three (3) Years Of The Issue Date Of This Solicitation, And (ii) The Production Location To Be Used For This Requirement Is The Same As Used For The Previous Production Run additionally, The Offeror Shall Submit A Certification, To Be Executed By The Officer Or Employee For The Offer, Stating That: (i) The Articles To Be Provided Will Be Produced Using The Same Facilities, Processes, Sequences Of Operations And Approved Subcontractors As Those Previously Delivered And Accepted By The Government Or The Original Equipment Manufacturer/prime Manufacturer, and (ii) The Previous Production Units Were Manufactured Without Material Review Board Disposition Or Waiver/deviation Request Or Rejection Of Pre-production Samples For Cause. (note: This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States And The Making Of A False, Fictitious, Or Fraudulent Certification May Render The Maker Subject To Prosecution Under Title 18, United States Code, Section 1001.) (b) Offerors Requesting Waiver Of First Article Approval Requirements Under The Provisions Of This Clause Are Cautioned To Submit Two Prices For Articles Required Herein - One That Is Based On Compliance With The First Article Approval Requirements And One that Is Based On A Waiver Of Such Requirements. Where An Offeror Submits Only One Price And Fails To Clearly State That The Price Is Based On Waiver Of The First Article Approval Requirements It Will Be Deemed To Be Based On Compliance With The First Article approval Requirements (c) In The Event Of The First Article Approval Requirement Is Granted, The Delivery Schedule For The Production Items Shall Be Reduced By The Number Of Days Designated For Delivery Of First Article Test Unit Plus The Number Of Calendar Days Indicated For The government Notification Of Conditional Approval Or Approval. These Requirements Are Specified In The Quality Assurance Section Of This Solicitation. If The Offeror Is Unable To Meet The Desired Schedule, He Shall Insert Below The Alternate Delivery Schedule he Offers To The Government. Offeror's Proposed Alternate Delivery Schedule (based On Waiver Of First Article Approval Requirements) within Days: item No. _______________ Quantity:_______ After Date Of Contract:__________ 4.9 100% Production Leak Test. Each Container, Uninstrumented And Without Dummy Load, Shall Be Raised To A Height Of 18 Inches And Allowed To Fall Freely To A Concrete Or Similarly Hard Surface, Landing Flat On Its Base. The Container Shall Then Be Prepared for Testing By Sealing All Breathing Devices And Inserting Suitable Pressurized Fittings And Gauges. The Container Shall Be Closed And Sealed In A Normal Manner. The Pneumatic-pressure Technique Of Method 5009 Of Federal Test Method Standard No. 101c Shall Be used To Detect Leakage. An Initial Pressure Setting Equal To 1.0 + 0.1 - 0 Psig Shall Be Used. After Stabilization, Pressure Shall Be Monitored For Thirty Minutes. Any Loss In Pressure In Excess Of 0.05 Psig (adjusted For Changes In Temperature And Barometric pressure) Shall Be Cause For Rejection. Warning container May Explode Or Fasteners May Fail During Test. Use Protective Barriers To Avoid Injury To Personnel. 4.10 Painting Of Container Interior Steel Surfaces. steel Surfaces (excluding Stainless Steel) Shall Be Cleaned And Pretreated For Painting In Accordance With Tt-c-490 (salt Spray Test Requirements Excluded). Paint Coating Shall Consist Of 2 Coats Of Primer In Accordance With Mil-p-53022, Mil-p-53030, Tt-p-664, or Mil-e-52891b. The Total Paint Thickness Shall Be 1.5 Mils (0.015 Inches) Minimum. To Comply With Ozone Depleting Substance Regulation, Whenever Cleaning In Accordance With Tt-c-490 Is Required, The Use Of Trichlorethylene (mil-t-81533) Is Deleted. all Costs And Responsibilities Related To The First Article Test Submission Container Shipment To And From The First Article Test Facility Are To Be Borne By The Contractor. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable

Municipality Of Rizal, Zamboanga Del Norte Tender

Civil And Construction...+1Construction Material
Corrigendum : Tender Amount Updated
Philippines
Closing Soon12 Feb 2025
Tender AmountPHP 2 Million (USD 34.2 K)
Details: Description Fabrication And Installation Solar Led Lights 650 Watts Phase - Iii.

Municipality Of Binangonan, Rizal Tender

Machinery and Tools
Corrigendum : Closing Date Modified
Philippines
Closing Soon10 Feb 2025
Tender AmountPHP 184.9 K (USD 3.1 K)
Details: Description . Sjn 959 Foton Ambulance Brcc 1 Pc Power Relay 2 Pcs Battery Terminal 1 Pc Penetraiting Oil 1 M Royal Cord 2 Pcs High Amp Terminal 2 Pcs Wiper Blade Wurth 2 Pcs Wurth Diesel Treatment Battery Charge 1 Set Aircon Discharge Hose Assy Freon 1 Pc Sanden Oil Labor 10 M Autotune #18 1 L Wurth Coolant 2 Pcs Brake & Parts Cleaner B3 A797 Mitsubishi L300 Ambulance 1 Set Cylinder Block Kiner 4 Pcs Cylinder Piston 1 Set Piston Ring Std 1 Set Engine Valves 1 Set Overhouling Gasket Machine Chop Cylinder Resurface 1 Set Valves Seal 2 Pcs Thread Locker 6 Pcs Brake & Parts Cleaner 1 Pc Penetraiting Oil 1 Pc Genuine Timing Belt 1 Pc Timing Belt Tensioner 1 Pc Timing Belt Bearing 1 Pc Clutch Pressure Plate 1 Pc Clutch Disk 1 Pc Clutch Releasing Bearing 8 L Castrol Crb Turbo Max 1 Pc Stp Oil Additivies 2 Pcs Main Drive Belt 4 Liters Castrol Transmax Transmission Oil 1 Pc Oil Filter 1 Pc Air Intake Element 1 Pc Fuel Filter 1 Set Injection Pump Reconditon/calbration Labor Aar 1794 Isuzu Bucket Truck 1 Box Auto Wire #16 20 Pcs Electrical Tape 50 Pcs Shrinking Tube 1 Set Fabricated Harness Railings 1 Pc Dielectric Grease Upper Control Box Cover Repair Wire Harness Cover Repair 4 Pcs Brake & Parts Cleaner 2 Plastic Cable Ties Labor 2 Pcs Enamel Paint Primer 2 Pcs Enamel Paint All Weather Yellow

Bharat Heavy Electricals Limited - BHEL Tender

India
Closing Date31 May 2025
Tender AmountRefer Documents 
Description: Bhel, Tiruchirappalli Invites New Suppliers For The Following: 1) Fabrication Of Steel Items / Boiler Components Under ‘with Bhel Material / With Vendor’s Material’ Categories For Various Projects (dept.: Bhel Trichy Outsourcing - Os) 2) Supply Of Various Items Listed In Bhel Website (dept.: Bhel Trichy Material Management - Mm) Application For Supplier Registration Is To Be Submitted In Online Portal By Visiting, Https://supplier.bhel.in And By Selecting The Respective Unit.

Inverclyde Council Tender

United Kingdom
Closing Date9 Jul 2025
Tender AmountRefer Documents 
Description: Design, Fabrication & Installation Of Full Scale Replica Ps. Comet Replica Boat
1641-1650 of 1718 active Tenders