Fabrication Tenders
Fabrication Tenders
Bureau Of Plant Industry Tender
Others
Philippines
Closing Soon31 Jan 2025
Tender AmountPHP 189.1 K (USD 3.2 K)
Details: Description Rfq No. 0080 Pr No. 0090-25bac Request For Quotation For Goods And Services Section 53.9 Negotiated Procurement - Small Value Procurement Supply And Delivery Of Agricultural And Marine Supplies Section I. Mandatory Requirements (note: Failure To Submit Any Of The Following Requirements Will Be Automatically Disqualified) A. Philgeps Registration (platinum Membership And Red Membership) Ü Mayor's / Business Permit Ü Income/business Tax Return (for Abc 500k And Above) Ü Certificate Of Bir Registration (for Abc 50k And Above) Ü Dti Registration Submit A Clear Copy Or Documentation Of The Proof Of Payment For The Renewal Of Expired Permit/s. B. Photocopy Of One (1) Company Id Or One (1) Valid Id W/ Three (3) Specimen Signature C. Notarized Original Omnibus Sworn Statement (for Abc 50k And Above) D. Professional License/curriculum Vitae (consulting Services) E. Menu List For Catering Services F. The Supplier Must Not Have Any Record Of Non-compliance Over The Past Three (3) Years. Section Ii. Instructions: 1. Please Write Legibly. 2. The Bidders/suppliers Or Their Authorized Representative Shall Accomplish This Form Including Unit Price And Total Price As Well As Sub- Total And Grand Total (if Applicable) And Affix Their Signature Over Printed Name Indicated In The Lower Portion Of This Form. 3. Indicate Offered Brands And Specifications (if Applicable). 4. Quotation(s)/proposal(s) Shall Be Submitted At The Procurement Management Section (bac Office), Bureau Of Plant Industry, 692 San Andres Street, Malate, Manila Or Through Courier Or Email (pms.rfq@buplant.da.gov.ph). 5. Only Sealed Canvass Submitted In Person Or Through Courier Shall Be Considered By The Bac. The Bidders/suppliers Shall Reflect On The Envelope The Rfq Number And The Pr No. The Bac Shall Not Be Responsible On The Pre-emptive/premature Opening Of The Proposal. 6. Any Insertions, Erasures, Or Overwriting Shall Be Valid If Only They Are Signed Or Initialed By The Bidders/suppliers Or Their Authorized Representative. 7. Quotation Must Include All Kinds Of Taxes For The Item(s)/services Listed Hereunder, Including Delivery Charges. 8. Price Quotation(s) Submitted Shall Be Valid For A Period Of One Hundred Twenty (120) Days Reckoned From The Deadline For Submission Of Quotations As Reflected In This Form. 9. Awarding Shall Be Done Per Lot. 10. Deadline For Submission Of Bids: January 31, 2025 (8:00am). 11. In Case Of Two Or More Bidders Are Determined To Have Submitted The Lowest Calculated And Responsive Quotation Or Highest Rated And Responsive Quotation For Consultancy Services, The Bpi- Bac Shall Employ The Rules Specified In The Irr Of Ra 9184. 12. Delivery/installation/completion Period: Thirty (30) Calendar Days From The Receipt Of The Purchase Order (p.o.). 13. The Uniform Guidelines For Blacklisting Set Forth In Appendix 17 Of The 2016 Revised Irr Of Ra 9184 Shall Apply. 14. The Supplier/bidder/contractor Must Have No Violation With Its Transactions With The Bureau Based On Bpi Records And Bpi Memorandum Order 328 Series Of 2023. 15. The Bureau Of Plant Industry Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. "notice/announcement: Bureau Of Plant Industry Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. " Approved Budget For The Contract: Php 189,100.00 End User: Cpmd Qty Unit Item/description Ceiling Price/ Offered Unit Total Per Unit(php) Brand Price Price 2 Piece Aluminum Cage For Trichogramma Host (as Per Sample) 30,000.00 15 Piece Aluminum Cribs For Trichogramma Host (as Per Sample) 2,500.00 6 Piece Morisson Cage Glass (fiber Glass; Type (as Per Sample) 12,000.00 4 Piece Fabricated Durable Steel/ Aluminum Rack (thick 8 Layers) With Heavy Duty Wheels (lock) 4,900.00 "place Of Delivery: Bpi-manila Proposed Delivery Period: 30 Days" Grand Total 189,100.00 Philgeps Posted Joan-may R. Tolentino Bac Chairperson Canvasser The Bpi-bids And Awards Committee (bac) 692 San Andres, Malate Manila In Connection With The Above Request, I/we Submit Our Quotation Indicated Above. I/we Have Carefully Read And Fully Understand The Minimum Requirements And Agree To Furnish And/ Or Deliver The Above Mentioned Requirement(s) In Conformity With The Specifications/terms Or Reference/scope Of Work Indicated/attached Thereto. ________________________________________ _________________________________ __________________ ________________________________________ Signature Over Printed Name Company Name Of Bidder Philgeps Registration Number ________________________________________ _________________________________ __________________ ________________________________________ Contact Number(s) Office Adress Email Address Of The Bidder ________________________________________ ________________________________________ Tax Identification Number (tin) Date Accomplished Payment Shall Be Made Through Land Bank's Lddap-ada/bank Transfer; Bank Transfer Fee Shall Be Charged Against The Creditor's Account. Payment Details: Banking Institution: ________________________________________________ Account Number:___________________________________________________ Account Name:______________________________________________________ Branch:_______________________________________________________________
Department Of Transportation Tender
Machinery and Tools...+1Furnitures and Fixtures
United States
Closing Date31 Jul 2026
Tender AmountRefer Documents
Description: Descriptionsign Manufacturing, Fabricating, Installation Materials, Supplies & Accessories
Maryland National Capital Park And Planning Commission Tender
Machinery and Tools
United States
Closing Date9 Feb 2025
Tender AmountRefer Documents
Description: On-call Exhibition, Fabrication, Installation And Related Services Multiple Award Task Order Contracts
Game Commission Tender
Civil And Construction...+1Others
United States
Closing Date7 Apr 2025
Tender AmountUSD 26.9 K This is an estimated amount, exact amount may vary.
Description: 23ne Gate Fabrication
ESKOM Department Tender
Others
South Africa
Closing Date14 Mar 2034
Tender AmountRefer Documents
Description: Palmiet U1 Generator Transformer Fire Protection Replacement E/bs3842-ldr Invloves The Decommissioning, Removal, Safe Storage Of The Existing Deluge System Design, As Well As The Design, Supply, Fabrication, Transportation, Installation, Integration, Testing And Commissioning Of The Complete, New Fully Functional Wet Piloted High Velocity (deluge) Fixed Water Spray Fire Protection System For The Unit 1 Generator Transformer At Palmiet Pumped Storage Scheme .
DEPT OF THE AIR FORCE USA Tender
Others
United States
Closing Date1 Oct 2025
Tender AmountRefer Documents
Details: Amendment 1 - 8/15/2024 the Above Amendment Changes/updates The Following Items: extenddate Offers Due attach Updated Neutron Star Industry User Guide V2 Dated 14aug24 With Specific Instruction Pertaining To Topic 5 Submissions address Announcement Questions To The Neutron Star Org Mailbox (afrl.rvkb.afrlneutronstardms@us.af.mil) Attention Of: Fromprimary: Ms. Ashley Patterson, Afrl/rvkb Tomr. Ever Orozco-perea, Afrl/rvkb Alternate: Mr. Isaac Thorp, Afrl/rvkband Ms. Regina Alflen, Afrl/rvkb ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- naics Code: The Naics Code For This Acquisition Is 541715 For Research And Development In The Physical, Engineering, And Life Sciences (except Nanotechnology And Biotechnology). federal Agency Name: Air Force Research Laboratory ara Title: Neutron Strategic Technology Advanced Research (neutron Star) Advanced Research Announcement (ara) ara Type: This Is An Open Ara; Initial Announcement submission Dates Are Indefiinite Until Further Notice program Summary: this Is An Open Ara Announcement Pursuant To The Authority Of 10 U.s.c. §4023procurement For Experimental Purposes. Afrl Is Interested In Receiving White Papers Regarding Nuclear-related Research And Development, Including, But Not Limited To Modeling And Simulation Of Re-entry Environments, Materials Characterization, Nuclear Explosion Monitoring, And Design, Fabrication And Experimentation Of Nuclear Delivery. Dialogue Between Prospective Offerors And Government Representatives Is Strongly Encouraged. this Solicitation Intends To Use The Acquisition Authority Provided By 10 U.s.c. §4023. This Authority Applies To The Acquisition Of Items Related To “…ordnance, Signal, Chemical Activity, Transportation, Energy, Medical, Spaceflight, And Aeronautical Supplies, Including Parts And Accessories, And Designs Thereof, That Are Necessary For Experimental Or Test Purposes In The Development Of The Best Supplies That Are Needed For The National Defense.” Consequently, White Papers And Proposals Should Address How The Proposed Effort Provides Benefits To The National Defense Relative To The Parameters Of This Authority, And A Strategy For Verifying Those Intended Benefits. *please See The Attached Neutron Star Industry User Guide For Guidance On Definitions, Processes, Submission Requirements And Evaluation Criteria.* background: afrl’s Geo Space Division (rvbn) Positions Afrl To Steward, Develop, And Deliver Leading Technologies To The Warfighter And The Nuclear Enterprise To Ensure The National Defense. thus, Proposed Solutions Should Be Innovative And Substantially Improve National Defense Capabilities Across The Domains Of National Nuclear Deterrence Operations. While The Government Describes Discrete Topic Areas Below, It Also Anticipates That Certain Comprehensive Technology Solutions And Prototypes May Require Multidiscipline Approaches That Address Two Or More Topic Areas. The Topic Areas Covered Under This Announcement May Be Used In Any Combination. The Government Reserves The Right To Add, Delete Or Modify The Topic Areas As Necessary. industry-government Communication: Dialogue Between Prospective Offerors And Government Representatives Is Strongly Encouraged Throughout The Life Of This Ara. However, Communication Shall Be Limited To The Contracting/agreement Officer Once Full Proposals Are Submitted For Evaluation/review. Discussions Should Focus On Understanding Government Objectives And Requirements, Feasibility Of Prospective Offeror Approach, And Prospective Offeror Prior Similar Efforts. discussions Shall Not Constitute A Commitment By The Government To Subsequently Fund Or Award Any Proposed Effort. No Guidance Related To Technical Approach Will Be Given. Offerors Are Advised That Only Contracting Or Agreement Officers Are Legally Authorized To Contractually Bind Or Otherwise Commit The Government. announcement Details: this Is A Hybrid Announcement. This Announcement Includes An Open Request For White Papers As Described Below. Additionally, Individual Solicitations For White Papers (two-step Solicitation) And/or Proposals (one-step Solicitation) Related To Discrete Requirements May Be Issued. Afrl Reserves The Right To Collapse A White Paper (two-step Solicitation) Into A One-step If The Situation Warrants And The White Paper Contains Sufficient Technical Detail To Do Full Technical Proposal Evaluation Instead Of White Paper Evaluation. open Announcement Request: Afrl/rvbn Is Soliciting White Papers On The Research Effort Described In The Below Topic Areas Pursuant To The Authority Of 10 U.s.c. §4023, Procurement For Experimental Purposes. White Papers Submitted Pursuant To The Open Announcement Request Follow The Two-step Procedures Described Below. White Papers Submitted Under The Open Announcement Request May Be Retained For 12 Months. open Announcement Submission: Unclassified White Papers Must Be Submitted To The Neutron Star Org Box At Afrl.rvkb.afrlneutronstardms@us.af.mil. Do Not Deliver Any Classified Portion Of The White Paper To This Address. If It Is Determined That A Classified White Paper Is Required, Please Contact The Neutron Star Org Mailbox For Specific Delivery Instructions. additional Instructions For White Paper Submissions Can Be Found In The Neutron Star Industry User Guide Attached To This Announcement. individual Solicitation Request: Individual Solicitations, Except For Limited Solicitations, For White Papers And Proposals Will Be Issued Under This Announcement Via The Government Point Of Entry (gpe) At Https://sam.gov. Notification Of Individual Solicitations May Be Announced On Other Platforms (i.e. Www.grants.gov) And Will Direct Offerors To The Gpe For Full Solicitation Details. individual Solicitation Submissions: Submission Requirements For Individual Solicitations Will Be Specified In The Solicitation Details Of Each Individual Solicitation. individual Solicitation Variations: Variations Of The Ara Individual Solicitation Process Are Available For Use. The Following Types Are Commonly Used But Are Not Considered All Inclusive. one-step: The One-step Process Is Used To Request Full Technical And Cost Proposals From Each Offeror. The Proposals Are Reviewed In Accordance With The Solicitation Criteria And Typically All, Part, Or None Of A Proposal May Be Selected For Award. two-step: The Two-step Process Is Used To Request White Papers And Rough Order Of Magnitude (rom) Costs. The Individual Solicitation Must State Whether An Unfavorable White Paper Review Will Bar The Offeror From Further Consideration. The Government May Retain Unselected White Papers For A Specific Period, Which Will Be Identified In The Individual Solicitation. White Papers Submitted Under The Open Announcement Request May Be Retained For 12 Months. Full Proposals Are Requested From Those Offerors Selected In The White Paper Review Process. After Proposals Are Received, They Are Processed And Reviewed In Accordance With The One-step Process. limited Individual Solicitations: This Approach Allows For Solicitation To A Limited Group Of Potential Offerors. Request For Proposals (rfp) Or Requests For White Papers Will Be Issued Directly To Potential Offerors Without A Requirement To Publish To The Gpe. the Government May Issue Solicitations That Combine One Or More Of The Above Approaches. announcement Modifications: Due To The Dynamically Evolving Nature Of Us Nuclear Deterrent Mission And Warfighter Needs, This Announcement Is Subject To Updates, Revisions, Or Additional Topic Areas. Therefore, Offerors Are Highly Encouraged To Continually Monitor Https://sam.gov To Ensure They Receive The Latest Guidance For This Announcement. The Government Shall Provide Updates To This Announcement No Less Than Annually. Updates May Include Changes To Topic Areas, Submission Requirements, Administrative Changes, Evaluation Criteria, Solicitation Methods, Etc. (not An Inclusive List). type Of Contract/instrument: The Government Reserves The Right To Award The Instrument Best Suited To The Nature Of The Research Proposed. Accordingly, The Government May Award Any Appropriate Contract, Agreement Or Assistance Instrument Type Under The Authorities Below: federal Acquisition Regulation (far) 10 U.s.c. §4021 "other Transaction For Research” 10 U.s.c. §4022 "other Transaction For Prototype" 10 U.s.c. §4023 "procurement For Experimental Purposes" 15 U.s.c §3710a – Cooperative Research And Developments Agreements 15 U.s.c §3715 – Partnership Intermediaries 32 C.f.r. §22.215 – Grants And Cooperative Agreements the Government Anticipates That A Mix Of Contract/ Instrument Types Will Be Used Throughout The Life Of This Announcement. Generally, Awards Under This Announcement Or Any Individual Solicitations May Be Cost-plus-fixed Fee (completion And Term), Cost Reimbursement, Firm Fixed Price, Cost Sharing, And Incentive. note: If A Federal Acquisition Regulation (far) Type Contract Is Recommended As The Award Type Authority, Then The Far Clauses Will Be Referenced At The Individual Solicitation Level Or Within The Request For Proposal. The Far And Far Supplement Provisions And Clauses Will Be Incorporated By Reference. The Full Text Of These Provisions And Clauses Can Be Found At Https://www.acquisition.gov. if An Assistance Instrument (grants Or Cooperative Agreements) Is Recommended As The Award Type, Then Articles And Guidance Found Under Dodgars, 200 Cfr, Omb/dod Policy Shall Be Used And Followed As Appropriate. if An Other Transaction (ot) Is Recommended As The Award Type, Then The Far References And Clauses Will Not Apply. The Terms And Conditions Of An Ot Agreement Shall Be Developed And Negotiated On A Case-by-case Basis. estimated Program Cost: The Overarching Announcement Has An Unrestricted Ceiling. However, Individual Solicitations May Elect To Provide An Estimated Program Value Or Funding Profile For Planning Purposes. anticipated Number Of Awards: The Air Force Anticipates Awarding Multiple Awards For This Announcement. However, The Air Force Reserves The Right To Award Zero, One, Or More Grants, Agreements, Other Transactions, Or Contracts For All, Some Or None Of The Solicited Effort Based On The Offeror’s Ability To Perform Desired Work And Funding Availability. There Is No Limit On The Number Of Awards That May Be Made To An Individual Offeror. award Schedule: The Anticipated Period Of Performance Will Be Determined Through Dialogue Between Prospective Offerors And Government Representatives For Each Topic Area And Specified In Each Individual Award. Individual Solicitations May Elect To Provide A Desired Technical Execution Schedule For Planning Purposes. deliverables: Hardware And Software Deliverables Will Be Specified Within A Separately Priced Contract/award Line Items And Data Deliverables Will Be Specified On Individual Contract Data Requirements List(s) (cdrls) In Any Resultant Contract Or An Ot Article. within Scope Award Modifications: Offerors Are Advised That Due To The Inherent Uncertainty Of Research And Development Efforts, Awards Resulting From This Announcement May Be Modified During Performance To Make Within Scope Changes, To Include But Not Limited To, Modifications Which Increase Overall Contract/award Ceiling Amount. system For Award Management (sam) Registration: Before The Government Can Issue An Award, An Offeror Must Be Registered In The System For Award Management (sam). If An Offeror Was Previously Registered In Central Contractor Registration (ccr), The Information Has Been Transferred To Sam. However, It Is In The Offeror’s Interest To Visit Sam And Ensure That All Their Data Is Up To Date From Sam And Other Databases To Avoid Delay In Award. Sam Replaced Ccr, Online Representations And Certifications Application (orca), And The Excluded Parties List System (epls). Sam Allows Firms Interested In Conducting Business With The Federal Government To Provide Basic Information On Business Capabilities And Financial Information. To Register, Visit Https://www.sam.gov. science & Technology (s&t) Program Protection: Offerors That Are Submitting Proposal Responses Only (not Required For Submission Of White Papers) Shall Submit As A Part Of The Proposal Submission 1.) A Completed Standard Form (sf) 424, Research And Related Senior/key Person Profile (expanded) Form For All Senior/key Personnel Proposed; And 2.) A Completed Security Program Questionnaire. Offerors May Be Asked To Provide A Mitigation Plan For Any Identified S&t Protection Risks. The Government Reserves The Right To Determine If An Offer Is Unawardable On The Grounds Of Unacceptable S&t Protection Risk Based On Its Review Of The Sf 424 And Security Program Questionnaire. by Submitting A Proposal, The Offeror Certifies That It Is In Compliance With Section 223(a) Of The William M. (mac) Thornberry National Defense Authorization Act For Fiscal Year 2021 Which Requires That: (a) The Principal Investigator (pi) And Other Key Personnel Certify That The Current And Pending Support Provided On The Proposal Is Current, Accurate And Complete; (b) Agree To Update Such Disclosure At The Request Of The Agency Prior To The Award Of Support And At Any Subsequent Time The Agency Determines Appropriate During The Term Of The Award; (c) The Pi And Other Key Personnel Have Been Made Aware Of The Requirements Under Section 223(a)(1) Of This Act; And (d) Certification Includes The Following Statement: “i Am Aware That Any False, Fictitious, Or Fraudulent Statements Or Claims May Subject Me To Criminal, Civil, Or Administrative Penalties. (u.s. Code, Title 218, Section 1001)”. announcement Period: The Overarching Announcement Has No End Date And Is In Effect Until Further Closed Or Rescinded. open Announcement Points Of Contact: address Technical Questions To The Neutron Star Org Mailbox (afrl.rvkb.afrlneutronstardms@us.af.mil) Attention Of: primary: Maj Montgomery, Afrl/rvbn alternate: Harper Baird, Afrl/rvbn address Announcement Questions To The Neutron Star Org Mailbox (afrl.rvkb.afrlneutronstardms@us.af.mil) Attention Of: primary: Ms. Ashley Patterson, Afrl/rvkb alternate: Mr. Isaac Thorp, Afrl/rvkb note: Individual Solicitation Points Of Contact Will Be Specified Within The Solicitation. topic Areas And Topic Descriptions note: All Topics Are Controlled By Security Access Requirements. 1. Nuclear System Development develop Foundational Capabilities, Requirements, Strategies, And Identify Candidate Technologies For Enhanced Nuclear Surety. 2. Nuclear Systems Integration integration Nuclear And Non-nuclear Components Of Future U.s. Nuclear Experiment Units For Development And Delivery To Various U.s. Integration And Test Organizations. 3. Nuclear System Flight Experimentation And Evaluation development And Delivery Of Nuclear Systems To Various U.s. Test Organizations. 4. Nuclear Explosion Monitoring improve Capabilities To Detect, Locate, Discriminate And Characterize The Depths, Yields And Other Emplacement Conditions Of Nuclear Explosions. 5. Nuclear Command, Control, And Communication enable Uninterrupted Delivery Of Strategic And Critical Conventional Data Within Contested And Nuclear Environments, Via Innovative New Technologies And Architectures. support Contractors: The Afrl Space Vehicles (rv) Directorate Have Contracted For Various Business And Staff Support Services From The Following Companies. aero Thermo Technology, 620 Discovery Drive Building I, Suite 110, Huntsville, Alabama 35806 fury Solutions Llc, 1617 Ashmont Ct, Xenia, Oh 45385-7060 apogee Engineering Llc, 8610 Explorer Drive Suite 305, Colorado Springs, Co 80920-1036 afrl Space Vehicles (rv) Directorate Require These Contractors To Obtain Administrative Access To Proprietary Information Submitted By Other Contractors. Administrative Access Is Defined As "handling Or Having Physical Control Over Information For The Sole Purpose Of Accomplishing The Administrative Functions Specified In The Administrative Support Contract, Which Do Not Require Technical Professionals Assigned To Accomplish The Specified Administrative Tasks." these Contractors Have Signed General Non-disclosure Agreements And Organizational Conflict Of Interest Statements. The Required Administrative Access Will Be Granted To Non-technical Professionals. Examples Of The Administrative Tasks Performed Include: a) Assembling And Organizing Information For R&d Case Files; b) Accessing Library Files For Use By Government Personnel; c) Handling And Administration Of Proposals, Contracts, Contract Funding And Queries; And d) Administering The Tool That Will Be Used For Conducting White Paper And Proposal Evaluations. These Various Business And Staff Support Service Contractors Are Prohibited From Responding To This Announcement. offerors Shall Either Complete Paragraph (*) Below Or Provide Written Objection To Administrative Access. Any Objection To Administrative Access: a) Shall Be Provided In Writing To The Contracting Officer Within 10 Days Of Rfp (or Prda, Baa, Etc., As Appropriate) Issuance; And b)shall Include A Detailed Statement Of The Basis For The Objection. *i Consent To Administrative Access, As Defined Above, By Rd And Rv Business And Staff Support Services Contractors To Any Proprietary Information Submitted Under This Solicitation Or Delivered Under Any Resulting Contract.
Department Of Correction Tender
Publishing and Printing
United States
Closing Date15 Jul 2026
Tender AmountRefer Documents
Description: Sign Fabrication Equipment
Department Of Agriculture Tender
Machinery and Tools...+1Automobiles and Auto Parts
Philippines
Closing Date12 Feb 2025
Tender AmountPHP 9.3 Million (USD 159.3 K)
Details: Description Section I. Invitation To Bid Da8-goods-2025-25 (id No Bt-25-goods-. Hvcdp -41917-0004) 1. The Department Of Agriculture-regional Field Office No. 8, Through The Hvcdp 2025 Current Fund Intends To Apply The Sum Of Nine Million Three Hundred Forty-four Thousand Five Hundred Sixty Pesos Only (p9,344,560.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For “supply And Delivery Of Various Garden Tools” Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture-regional Field Office No. 8, Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required Within Thirty (30) Calendar Days From Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. Qty Uom Item Description Unit Cost Total Cost Lot 1: 2884,560.00 408 Pcs. Bolo, (2.5" Width, 8 "long Excluding Wooden Handle), Fabricated, Made Of Leaf Spring 400 163,200.00 408 Pcs Garden Hoe With Handle (head - 230 X 175mm, 1.360g In Forged Steel, With Varnished Hard Wood Handle Length Approx. 110-120cm, Blade Edge) 450 183,600.00 136 Roll Garden Hose With Nozzle, High Quality, 90 Meters 1/2" Diameter 2,500.00 340,000.00 272 Pcs. Pick Mattock (blade Edge And Pick Made Of Durable Forged Steel, Hard Wood Handle) 450 122,400.00 544 Pcs. Plastic Water Sprinkler 8 Liters Capacity) 350 190,400.00 544 Pcs. Potting Medium (carbonized Rice Hull), 5kg Per Bag 400 217,600.00 544 Pcs. Pruning Shears, 7 1/2" High Carbon Steel Blades, Stainless Steel Spring, Locking Feature For Storage And Safety 600 326,400.00 408 Pcs. Rake, 14'' Straight, Heavy Duty With 48'' Steel Handle 400 163,200.00 3808 Pcs. Seedling Tray (105 Holes) Made Of Plastic Materials 95 361,760.00 408 Pcs. Spade With D-handle (48"long, 23cm Wide Blade, High Strength Steel Handle, High Impact D-grip, Heavy Duty) 450 183,600.00 272 Pcs. Spading Fork (42"long, Steel Handle, With 4 Forged Steel Tines With 7" Wide And 10" Long, 4-5 Lbs Weight) 450 122,400.00 136 Roll Culture Net Or Trellising Net, 7" X 7" Grid X 2.4m X 100m/ Nylon Net 3,000.00 408,000.00 408 Pcs. Trowel, Metal, 12 X 3, Painted 250 102,000.00 Lot 2: 2,992,000.00 272 Roll Fine Net (black), 54 Mesh Or 80% Shading, 1.2m X 100m 7,000.00 1,904,000.00 272 Roll Plastic Mulch, Black, 1.20m X 0.03mm X 400 Meters 4,000.00 1,088,000.00 Lot 3: 3,468,000.00 136 Pcs. Hdpe Plastic Drum With Cover, Open Top, 200 Li Capacity, Blue 3,500.00 476,000.00 408 Pcs. Pressure Sprayer, Heavy Duty, Semi Automatic, 3.0l Cap Pump-top, Hard Plastic Tank, Compatible With Common Sanitizers. Disinfectants, Alcohol, And Even Fertilizers, And Pesticides 600 244,800.00 136 Pcs. Uv Film, 110" X 0.005" X 150; Polyethylene; 150 Microns Thickness 16,000.00 2,176,000.00 3808 Pcs Hdpe Plastic Pots, 30cm Dia., 2mm Thickness, Durable And Thick Material 150 571,200.00 Terms And Conditions: A During The Opening Of Bids, Bidder/s Shall: 1. Submit Duly Notarized Affidavit Of Stock Suffiency; 2. Bidder/s May Indicate The Brand That They Offered; B Winning Bidder/s Shall: 1. Deliver New Items To Abuyog Experiment Station, Abuyog, Leyte 2. Deliver The Items 30 Calendar Days Upon Receipt Of Ntp; 3. Inform The Gss Section And End User One (1) Week Before The Delivery Schedule; 4. Present Sample Of Items To The End User Before The Delivery; 5.deliver The Items As Specified In The Contract Of Agreement; 6. Assemble The Items (specifically Garden Hoe And Pickmattock) During The Delivery To The Drop-off Point (abuyog Experiment Station, Abuyog, Leyte) C Any Delay Of Delivery Of The Item Shall Be Subjected To Liquidated Damages Equivalent To 1/10 Of 1% Of The Contract Price Per Day Of Delay Of The Undelivered Items; D Payment Shall Be Made After Complete Delivery, Inspection, Acceptance And Submission Of All Necessary Documents Required For The Processing Of The Payment; E Winning Bidder Shall Submit A Snapshot Of A Business Bank Account (preferably Landbank) To Effect Payment. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The Irr Of Ra 9184. 4. Prospective Bidders May Obtain Further Information From Department Of Agriculture – Regional Field Office 8 And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8:00am To 5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 24, 2025 To February 12, 2025 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee Pursuant To The Latest Guidelines Issued By The Gppb. The Cost Of The Bidding Documents Shall Correspond To The Total Abc Of The Selected Lots/s On Which The Supplier Intends To Bid, With A Range As Indicated In The Table Below. Approved Budget For The Contract Maximum Cost Of Bidding Documents (in Philippine Peso) 500,000 And Below 500.00 More Than 500,000 Up To 1 Million 1,000.00 More Than 1 Million Up To 5 Million 5,000.00 6. The Department Of Agriculture-rfo 8 Will Hold A Pre-bid Conference On January 31, 2025, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City And Through Face To Face Or Video Conferencing Or Webcasting Via Google Meet, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before February 12, 2025, 9:00 Am (bac-secretariat Time). Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On February 12, 2025, 9:00 Am (bac-secretariat Time) At Da8 Bac Office, 4th Floor Green Bldg., Kanhuraw Hill, Tacloban City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend Either Physically Or Through Video Conferencing Via Google Meet. 10. The Department Of Agriculture-rfo 8 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. Da Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 12. For Further Information, Please Refer To: Martins A. Alde Head, Bac-secretariat Department Of Agriculture, Regional Field Office-8 Kanhuraw Hill, Tacloban City Darfo8.bacsec@gmail.com Mobile No. 09061694318 Easternvisayas.da.gov.ph 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.philgeps.gov.ph Or Easternvisayas.da.gov.ph Approved By: (sgd.) Larry U. Sultan, Jd Chairman, Bids And Awards Committee
DEPT OF THE NAVY USA Tender
Chemical Products
United States
Closing Soon31 Jan 2025
Tender AmountRefer Documents
Description: Contact Information|4|n743.7|wve|717-605-3875|jill.sabol@navy.mil|
item Unique Identification And Valuation (mar 2022)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Section C|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
wide Area Workflow Payment Instructions (dec 2018)|16|material - Invoice & Receiving Report (combo) Certifications - Stand-alone Receiving Report |material - Inspection & Acceptance At Source Certifications - Inspection At Destination & Acceptance At Other |tbd|n00104|tbd|certifications - N39040; Material -s4306a |n50286|tbd|133.2|n/a|n/a|certifications - N39040|n/a|n/a|see Dd Form 1423|port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From The Date Of Delivery |one Year From The Date Of Delivery |||||
warranty Of Data--basic (mar 2014)|2|||
transportation Of Supplies By Sea (feb 2019)|2|||
first Article Approval--government Testing (sep 1989)|7|one|0001ac|180|receiving Officer, Code 526, Portsmouth Naval Shipyard, Portsmouth, Nh 03804-5000; Mf Equipment Testing Laboratory, Code 270.1 |30|||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (nov 2020)|13||||||||||||||
annual Representations And Certifications (may 2022)|13|334220|1250||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
the Hour And Date Specified For Receipt Of Offers Has Been Extended To 4:30pm Est On 31 January 2025.
the Small Business Set-aside Is Been Dissolved.
1. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution.
2. Any Contract/order Awarded As A Result Of This Solicitation Will Be A "do" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas). See 52.211-14, Notice Of Priority Rating For National Defense, Emergency
preparedness, And Energy Program Use.
3. Only Those Sources With An Acceptable Quality Assurance Manual Are Eligible For Award Under This Solicitation. The Navy Has Found From Past Experience That Quality Control Is Essential To Assure Personnel Safety In Critical Areas And To Provide For The Safe
operation Of Submarines And Certain Systems On Surface Ships. See Wssterm Lz02. Vendors Submitting Quality Manuals Shall Submit Them To Jill.sabol@navy.mil Instead Of 0243.qamanual@navy.mil.
4. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
5. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Of Offers.
6. If Drawings Are Included In The Solicitation, Access Must Be Requested On The Individual Solicitation Page On Contract Opportunities Via The Government's Sam.gov Website. Include Your Cage Code In Your Request.
7. Unless Otherwise Stated On The Dd1423, Submission Of Dd1423 Certification Data (cdrls) Will Be On Or Before 20 Days Prior To The Material (line Item 0001aa) Delivery Date. Pnsy Review/acceptance Of Cdrls Shall Be 6 Working Days After Receipt Of Cdrls. Final
delivery Of Material Will Be On Or Before 500 Days After The Effective Date Of The Order.
8. This Procurement Has First Article Test Requirements.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.3 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
drawing Data=cpg1022-1 |96169| D| |d|0000.a | D|49998|0074948
drawing Data=cpg1022-1 |96169| D| |d|0000.b | C|49998|0129832
drawing Data=cpg1022-1 |96169| D| |d|0000.c | D|49998|0016731
drawing Data=cpg1022-1 |96169| D| |d|0001 | D|49998|0095662
drawing Data=cpg1022-1 |96169| D| |d|0002 | C|49998|0048488
drawing Data=cpg1022-1 |96169| D| |d|0003 | C|49998|0049407
drawing Data=cpg1022-1 |96169| D| |d|0004 | D|49998|0061828
drawing Data=cpg1022-1 |96169| D| |d|0005 | B|49998|0017369
drawing Data=cpg1022-1 |96169| D| |d|0006 | D|49998|0024738
drawing Data=cpg1022-1 |96169| D| |d|0007 | B|49998|0020905
drawing Data=cpg1022-1 |96169| D| |d|0008 | D|49998|0019097
drawing Data=cpg1022-1 |96169| D| |d|0009 | C|49998|0017763
drawing Data=cpg1022-1 |96169| D| |d|0010 | D|49998|0055696
drawing Data=cpg1022-1 |96169| D| |d|0011 | B|49998|0015906
drawing Data=cpg1025 |96169| P| |d|0001 | P|49998|0031294
drawing Data=cpg1025 |96169| P| |d|0002 | P|49998|0013077
drawing Data=cpg1025 |96169| P| |d|0003 | P|49998|0011923
drawing Data=cpg1025 |96169| P| |d|0004 | P|49998|0021385
drawing Data=cpg1025 |96169| P| |d|0005 | P|49998|0020123
drawing Data=cpg1025 |96169| P| |d|0006 | P|49998|0012596
drawing Data=cpg1025 |96169| P| |d|0007 | P|49998|0020575
drawing Data=cpg1025 |96169| P| |d|0008 | P|49998|0025829
drawing Data=cpg1025 |96169| P| |d|0009 | P|49998|0025129
drawing Data=cpg1025 |96169| P| |d|0010 | P|49998|0025305
drawing Data=cpg1025 |96169| P| |d|0011 | P|49998|0026218
drawing Data=cpg1025 |96169| P| |d|0012 | P|49998|0023610
drawing Data=cpg1025 |96169| P| |d|0013 | P|49998|0024504
drawing Data=cpg1025 |96169| P| |d|0014 | P|49998|0020909
drawing Data=cpg1025 |96169| P| |d|0015 | P|49998|0025043
drawing Data=cpg1025 |96169| P| |d|0016 | P|49998|0024761
drawing Data=cpg1025 |96169| P| |d|0017 | P|49998|0027299
drawing Data=cpg1025 |96169| P| |d|0018 | P|49998|0042937
drawing Data=cpg1025 |96169| P| |d|0019 | P|49998|0040502
drawing Data=cpg1025 |96169| P| |d|0020 | P|49998|0036449
drawing Data=cpg1025 |96169| P| |d|0021 | P|49998|0036830
drawing Data=cpg1025 |96169| P| |d|0022 | P|49998|0033796
drawing Data=cpg1025 |96169| P| |d|0023 | P|49998|0027339
drawing Data=cpg1025 |96169| P| |d|0024 | P|49998|0041721
drawing Data=cpg1025 |96169| P| |d|0025 | P|49998|0036782
drawing Data=cpg1025 |96169| P| |d|0026 | P|49998|0037911
drawing Data=cpg1025 |96169| P| |d|0027 | P|49998|0019706
drawing Data=cpg1025 |96169| P| |d|0028 | P|49998|0031258
drawing Data=cpg1025 |96169| P| |d|0029 | P|49998|0028386
drawing Data=cpg1025 |96169| P| |d|0030 | P|49998|0034996
drawing Data=cpg1025 |96169| P| |d|0031 | P|49998|0037489
drawing Data=cpg1025 |96169| P| |d|0032 | P|49998|0026677
drawing Data=cpg1025 |96169| P| |d|0033 | P|49998|0017312
drawing Data=cpg1025 |96169| P| |d|0034 | P|49998|0030851
drawing Data=cpg1025 |96169| P| |d|0035 | P|49998|0028589
drawing Data=cpg1025 |96169| P| |d|0036 | P|49998|0009063
drawing Data=cpg1025 |96169| P| |d|0037 | P|49998|0004112
drawing Data=cpg1025 |96169| P| |d|0038 | P|49998|0013152
drawing Data=cpg1025 |96169| P| |d|0039 | P|49998|0009572
drawing Data=cpg1025 |96169| P| |d|0040 | P|49998|0012321
drawing Data=cpg1025 |96169| P| |d|0041 | P|49998|0009310
drawing Data=cpg1025 |96169| P| |d|0042 | P|49998|0006784
drawing Data=cpg1025 |96169| P| |d|0043 | P|49998|0006124
drawing Data=cpg1025 |96169| P| |d|0044 | P|49998|0008489
drawing Data=cpg1025 |96169| P| |d|0045 | P|49998|0007044
drawing Data=cpg1025-1 |96169| M| |d|0000.a | M|49998|0758554
drawing Data=cpg1025-1 |96169| M| |d|0000.b | G|49998|1277830
drawing Data=cpg1025-1 |96169| M| |d|0000.c | M|49998|0763525
drawing Data=cpg1025-1 |96169| M| |d|0001 | L|49998|1091102
drawing Data=cpg1025-1 |96169| M| |d|0002 | M|49998|1201771
drawing Data=cpg1025-1 |96169| M| |d|0003 | L|49998|1102853
drawing Data=cpg1025-1 |96169| M| |d|0004 | E|49998|0841196
drawing Data=cpg1025-1 |96169| M| |d|0005 | D|49998|0392069
drawing Data=cpg1025-1 |96169| M| |d|0006 | B|49998|0547744
drawing Data=cpg1025-1 |96169| M| |d|0007 | D|49998|0409468
drawing Data=cpg1025-1 |96169| M| |d|0008 | B|49998|0424196
drawing Data=cpg1025-1 |96169| M| |d|0009 | L|49998|0555538
drawing Data=cpg1025-1 |96169| M| |d|0010 | J|49998|0536845
drawing Data=cpg1025-1 |96169| M| |d|0011 | B|49998|0594238
drawing Data=cpg1025-1 |96169| M| |d|0012 | A|49998|0635118
drawing Data=cpg1025-1 |96169| M| |d|0013 | F|49998|0683845
drawing Data=cpg1025-1 |96169| M| |d|0014 | C|49998|0649459
drawing Data=cpg1025-1 |96169| M| |d|0015 | A|49998|0543639
drawing Data=cpg1025-1 |96169| M| |d|0016 | C|49998|0683318
drawing Data=cpg1025-1 |96169| M| |d|0017 | D|49998|0554866
drawing Data=cpg1025-1 |96169| M| |d|0018 | D|49998|0421953
drawing Data=cpg1025-1 |96169| M| |d|0019 | K|49998|0559184
drawing Data=cpg1025-1 |96169| M| |d|0020 | K|49998|0762215
drawing Data=cpg1025-1 |96169| M| |d|0021 | M|49998|0397387
drawing Data=cpg1025-2 |96169| K| |d|0000.a | K|49998|0360625
drawing Data=cpg1025-2 |96169| K| |d|0000.b | D|49998|0070485
drawing Data=cpg1025-2 |96169| K| |d|0000.c | K|49998|0359139
drawing Data=cpg1025-2 |96169| K| |d|0001 | J|49998|0498469
drawing Data=cpg1025-2 |96169| K| |d|0002 | K|49998|0607194
drawing Data=cpg1025-2 |96169| K| |d|0003 | G|49998|0491202
drawing Data=cpg1025-2 |96169| K| |d|0004 | E|49998|0491268
drawing Data=cpg1025-2 |96169| K| |d|0005 | F|49998|0659594
drawing Data=cpg1025-2 |96169| K| |d|0006 | F|49998|0049431
drawing Data=cpg1025-2 |96169| K| |d|0007 | F|49998|0566711
drawing Data=cpg1025-2 |96169| K| |d|0008 | D|49998|0028577
drawing Data=cpg1025-2 |96169| K| |d|0009 | D|49998|0032712
drawing Data=cpg1025-2 |96169| K| |d|0010 | D|49998|0014537
drawing Data=cpg1025-2 |96169| K| |d|0011 | D|49998|0017877
drawing Data=cpg1025-2 |96169| K| |d|0012 | D|49998|0014800
drawing Data=cpg1025-2 |96169| K| |d|0013 | D|49998|0017435
drawing Data=cpg1025-2 |96169| K| |d|0014 | D|49998|0019633
drawing Data=cpg1025-2 |96169| K| |d|0015 | H|49998|0360727
drawing Data=cpg1025-2 |96169| K| |d|0016 | K|49998|0452047
drawing Data=cpg1025-2 |96169| K| |d|0017 | K|49998|0289051
drawing Data=d135925 |13030| J| |d|0001 | J|49998|0172425
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=qq-n-286 | | |g |001207|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=mil-std-2132 | | |d |080310|f| |01|
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=a-a-59004 | | |b |181118|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 ;hull Penetrator Assembly Must Be In Accordance With Spears Associates Inc. Drawing D135925; Assembly D135925-1, And General Dynamics Specification Cpg 1025, Less Piece 19, Except As Amplified Or Modified Herein.;
3.2 First Article Approval (government Testing) - First Article Test (fat) And Approval Is Required.
3.3 ;the Fat Sample(s) Must Not Be Delivered Against The Contract Quantity.;
3.4 ;paragraph 4.1 Of Cpg 1025 Does Not Apply.;
3.5 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;hull Penetrator Body (cpg 1025/2-003), Nut (cpg 1022/1-005), And Washer (cpg 1025/1-005);
material - ;qq-n-286, Form 2 Or Form 7, Annealed And Age Hardened. Mechanical Properties To Be In Accordance With Cpg 1025, Paragraph 3.3.2;
3.6 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - Quality Conformance/compliance Inspection
item - ;each Hull Penetrator Assembly;
performance - ;cpg 1025, Paragraph 4.5;
acceptance - ;cpg 1025, Paragraph 4.5;
attribute - Annealing And Age Hardening
item - ;each Hull Penetrator Body (cpg 1025/2-003), Nut (cpg 1022/1-005), And Washer (cpg 1025/1-005);
performance - Qq-n-286
test - Ultrasonic Inspection On Starting Material
item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract;
performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286
acceptance - Qq-n-286
attribute - Time Temperature Plots And Certified Calibration Records Of Furnace Temperature Measuring Devices
item - ;each Hull Penetrator Body (cpg 1025/2-003), Nut (cpg 1022/1-005), And Washer (cpg 1025/1-005);
performance - ;when Required By Cpg 1025, Paragraph 3.3.1.2;
test - ;dye Penetrant Inspection;
item - ;each Penetrator Body (cpg 1025/2-003), Nut (cpg 1022/1-005), And Washer (cpg 1025/1-005);
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
3.7 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This
contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes.
3.8 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.8.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.8.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22
of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.8.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.9 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel Applications,
or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not Permitted On ;hull
penetrator Body (cpg 1025/2-003), Nut (cpg 1022/1-005), And Washer (cpg 1025/1-005); . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.10 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.11 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories:
huntington Alloys, A Special Metals Company
attn: Bill Bolenr
3200 Riverside Drive
huntington, Wv 257059
phone: (304) 526-5889
fax: (304) 526-5973
metallurgical Consultants, Inc.
attn: W. M. Buehler
4820 Caroline
po Box 88046
houston, Tx 77288-0046
phone: (713) 526-6351
fax: (713) 526-2964
naval Surface Warfare Center, Carderock Division
attn: Eric Focht Code 614
9500 Macarthur Blvd
west Bethesda, Md 20817-5700
phone: (301) 227-5032
fax: (301) 227-5576
teledyne Allvac
attn: Dr. W. D. Cao
2020 Ashcraft Ave.
monroe, Nc 28110
phone: (704) 289-4511
fax: (704) 289-4269
westmoreland Mechanical Testing And Research Inc.
attn: Andrew Wisniewski
p.o. Box 388
youngstown, Pa 15696-0388
mannesmann Rohrenwerke
mannesmann Forschungsinstitut (mfi)
attn: Dr. Weiss
postfach 251160
47251 Duisburg
germany
phone: 011-49-0203-9993194
fax: 011-49-0203-9994415
thyssenkrupp Vdm Usa, Inc.
attn: D. C. Agarwal
11210 Steeplecrest Drive, Suite 120
houston, Tx 77065-4939
phone: (281) 955-6683
3.12 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The
fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly.
3.13 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General
acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided
in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria.
the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.14 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.14.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.14.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.14.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.15 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.15.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
3.16 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.17 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings. ^ Quality Assurance Requirements ^
3.18 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.19 Welding Requirements - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In Addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As
part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.19.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.19.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. ''wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc'.' Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz'')
3.19.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010, S9074-ar-gib-010a/278,248d The
contract.
3.19.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.19.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.19.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.19.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.19.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.19.9 When Production Or Repair Welding Is Required On Titanium Materials, Theapplicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.19.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.19.11 A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.19.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.20 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.20.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.20.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.20.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.20.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.20.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.21 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.21.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.21.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.22 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.22.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.22.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.22.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.22.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.22.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.23 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.23.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.23.2 Inspection For Completeness And Proper Type.
3.23.3 Verification Of Material Quality Received.
3.23.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.23.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.23.6 Identification And Protection From Improper Use Or Disposition.
3.23.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.23.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.23.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.24 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.24.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.25 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.25.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.25.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.25.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.25.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.26 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.26.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.26.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________ (marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable)
_________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.)
3.26.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.26.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.26.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.27 Material Handling - The Written Material Control Process Must Include The Following:
3.27.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.27.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.27.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.27.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.27.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.27.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.28 Receiving Inspection -
3.28.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.28.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.29 Discrepancy Reporting -
3.29.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.30 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.30.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.30.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.30.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.30.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.31 First Article Test/inspection (government) - ;destructive; - The Contractor Shall Deliver ;one (1) Each Penetrator Assembly, One (1) Each Header Assembly, And One (1) Each Inboard Plug Assembly; Unit(s) To ;receiving Officer, Code 526, Portsmouth Naval
shipyard, Portsmouth, Nh 03804-5000; Mf Equipment Testing Laboratory, Code 270.1; For First Article Tests In Accordance With The ;requirements Of Cpg 1025, Paragraph 4.4. Underwater Explosion Testing Is Not Required; .
3.32 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And
1601-1610 of 1633 active Tenders